Page 1

Education, Children's and Leisure Services Committee 
Wednesday, 24 August 2022 
NOTICE IS HEREBY GIVEN that a Meeting of the Education, Children's and
Leisure Services Committee is to be held at Council Chambers, Council Office,
High Street, Elgin, IV30 1BX on Wednesday, 24 August 2022 at 09:30. 
BUSINESS 
1. Sederunt 
2. Declaration of Group Decisions and Members Interests
*
3. Minutes of Meeting of 8 June 2022 7 - 14
4. Written Questions ** 
5. Children and Families Social Work Services Revenue
Budget Monitoring to 30 June 2022
Report by Chief Officer, Health and Social Care Moray  
15 - 20
6.* Education National Improvement Framework Report
and Plan
Report by the Depute Chief Executive (Education, Communities and
Organisational Development)  
21 - 50
7.* Scottish Attainment Challenge
Report by the Depute Chief Executive (Education, Communities and
Organisational Development)  
51 - 60
Page 1

Page 2

8.* Education Revenue Budget Monitoring to 30 June 2022
Report by the Depute Chief Executive (Education, Communities and
Organisational Development)  
61 - 66
9.* Education Resources and Communities and Education
Capital Budget Monitoring Report to 30 June 2022
Report by the Depute Chief Executive (Education, Communities and
Organisational Development)  
67 - 74
10.* Education Resources and Communities Revenue
Budget Monitoring to 30 June 2022
Report by the Depute Chief Executive (Education, Communities and
Organisational Development)  
75 - 78
11.* Learning Estate - Closure of Inveravon Primary School -
Statutory Consultation
Report by the Depute Chief Executive (Education, Communities and
Organisational Development)  
79 -
142
12. Question Time ***
Consider any oral question on matters delegated to the Committee in
terms of the Council's Scheme of Administration. 
Only items marked * can be considered and determined
by all members of the Committee   
Summary of Education, Children's and Leisure Services
Committee
To exercise all the functions of the Council as Education Authority
within the terms of relevant legislation with regard to school education,
nurseries and child care, Gaelic, children’s services, leisure, libraries
and museums, sport and the arts, CLD, life long learning, youth justice
and child protection.         
Information Reports 
Information Report - Moray Education ELC - Capacity
and Demand for Funded Childcare Places
143 -
152 
Information Report - Singleton Inspections of ELC
Centres - Published Reports March-June 2022
153 -
156
Page 2

Page 3

Information Report - Moray Education ELC - Major and
Minor Infrastructure Works Update
157 -
164 
Any person wishing to attend the meeting should contact customer services
on 01343 563217 prior to the meeting as the number of attendees is restricted
due to the recent Covid pandemic 
You can however watch the webcast of the meeting by going to :
http://www.moray.gov.uk/moray_standard/page_43661.html 
Page 3

Page 4

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how
the individual or members of the group will vote on any item(s) of business on
the Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any
relevant and competent business within the specified remits not already on the
agenda, to the Chair provided it is received by the Proper Officer or Committee
Services by 12 noon two working days prior to the day of the meeting.  A copy
of any written answer provided by the Chair will be tabled at the start of the
relevant section of the meeting.  The Member who has put the question may,
after the answer has been given, ask one supplementary question directly
related to the subject matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the
consent of the Chair. If a Member does not have the opportunity to put a
supplementary question because no time remains, then he or she can submit it
in writing to the Proper Officer who will arrange for a written answer to be
provided within 7 working days. 
*** Question Time - At each ordinary meeting of the Committee ten minutes will be
allowed for Members questions when any Member of the Committee can put a
question to the Chair on any business within the remit of that Section of the
Committee.  The Member who has put the question may, after the answer has
been given, ask one supplementary question directly related to the subject
matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than ten minutes
after the Committee has started on the relevant item of business, except with
the consent of the Chair.  If a Member does not have the opportunity to put a
supplementary question because no time remains, then he/she can submit it in
writing to the proper officer who will arrange for a written answer to be provided
within seven working days. 
Page 4

Page 5

THE MORAY COUNCIL 
Education, Children's and Leisure Services Committee 
SEDERUNT 
Councillor Kathleen Robertson  (Chair)
Councillor Bridget Mustard  (Depute Chair)  
Councillor James  Allan  (Member)
Councillor Neil Cameron  (Member)
Councillor Tracy Colyer  (Member)
Councillor Juli Harris  (Member)
Councillor Sandy Keith  (Member)
Councillor Scott Lawrence  (Member)
Councillor Marc Macrae  (Member)
Councillor Paul McBain  (Member)
Councillor Derek Ross  (Member)
Councillor Sonya Warren  (Member)
Councillor Ben Williams  (Member)  
Sheila Brumby  (Non-Voting Member)
Mrs Anne Currie  (Non-Voting Member)
Reverend Tembu Rongong  (Non-Voting Member)
Mrs Susan Slater  (Non-Voting Member)
Ms Angela Stuart  (Non-Voting Member)
Emma Tunnard  (Non-Voting Member)
Clerk Name: Tracey Sutherland
Clerk Telephone: 07971 879268
Clerk Email: committee.services@moray.gov.uk 
Page 5

Page 6

Page 6

Page 7

MORAY COUNCIL 
Minute of Meeting of the Education, Children's and Leisure Services
Committee 
Wednesday, 08 June 2022 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor James  Allan, Sheila Brumby, Councillor Neil Cameron, Councillor Tracy
Colyer, Mrs Anne Currie, Councillor Juli Harris, Councillor Sandy Keith, Councillor
Scott Lawrence, Councillor Marc Macrae, Councillor Neil McLennan, Councillor
Bridget Mustard, Councillor Kathleen Robertson, Councillor Derek Ross, Mrs Susan
Slater, Ms Angela Stuart, Emma Tunnard, Councillor Sonya Warren, Councillor Ben
Williams 
APOLOGIES 
Reverend Tembu Rongong 
IN ATTENDANCE 
Also in attendance at the above meeting were the Depute Chief Executive
(Education, Communities and Organisational Development), Head of Governance,
Strategy and Performance, Head of Education, Head of Education Resources and
Communities, Head of Housing and Property, Acting Head of Children, Famililes
and Justice Social Work, Sport and Culture Service Manager, Interim Service
Manager - Children and Families and Criminal Justice Social Work, Stewart
McLaughlin, Quality Improvement Manager, Early Years Service Manager and
Tracey Sutherland, Committee Services Officer. 
1.         Chair 
The meeting was chaired by Councillor Kathleen Robertson, with the exception of
Item 11 which was chaired by Councillor Neil McLennan.  
2.         Declaration of Group Decisions and Members Interests * 
In terms of Standing Order 20 and the Councillors’ Code of Conduct, Councillors
Robertson and Mustard declared an interest in Item 11 and would remove
themselves from the meeting during the consideration of that item.  
In respect of other items on the agenda there were no other declarations from
Group Leaders or Spokespersons in regard to any prior decisions taken on how
Members will vote on any item on the agenda or any declarations of Member’s
interests in respect of any items on the agenda. 
3.         Welcome and Thanks 
The Committee joined the Chair in welcoming the new religious representative,
Mrs Sheila Brumby and the new parent representative, Mrs Emma Tunnard to their
first meeting of the Committee.
Item 3.
Page 7

Page 8

She further thanked Mrs Susan Slater and Ms Angela Stuart, the teacher
representatives as this would be their final meeting of their 5 year term sitting on
the Committee.  Elections are underway for the appointment of new reps.   
4.         Resolution 
The meeting resolved that in terms of Section 50A (4) and (5) of the Local
Government (Scotland) Act 19973, as amended, the public and media
representatives be excluded from the meeting for Item 19 of business on the
grounds that it involves the likely disclosure of exempt information of the class
described in the relevant Paragraphs of Part 1 of Schedule 7A of the Act.  
Para Number of the
Minute Para Number of Schedule 7a
20
Para 9
Information relating to terms proposed or to be proposed
by or to the Authority 
5.         Minute of Meeting of 9 March 2022 
The minute of the meeting of the Education, Children’s and Leisure Services
Committee dated 9 March 2022 was submitted and approved.  
The Committee joined the Chair in thanking Councillor Warren, the previous Chair
of the Committee for her work over the last few years.    
6.         Written Questions ** 
The Committee noted that no written questions had been submitted.    
7.         Allocation of Education Funding Update 
Under reference to paragraph 12 of the minute of the meeting of 9 March 2022 a
report by the Depute Chief Executive updated the Committee on progress with
regards to the Allocation of Education Funding.  
Councillor Ross moved that any secondary subject vacancies arising due to NQT's
not taking up a place in Moray, are advertised as main grade teaching posts on a
permanent basis, as he felt that in advertising the vacancies as temporary it would
deter potential applicants from applying.  This was seconded by Councillor Keith.  
Following consideration, during which the Head of Governance, Strategy and
Performance advised that a suspension of standing orders would be required, he
further added that if Councillor Ross was so minded, it would be prudent to add
'subject to any additional financial permission required from Moray Council in terms
of potential budget pressures' to the end of his motion as a precaution.  
Councillor Ross confirmed he was happy to include the additional wording.  
Following further consideration in which Officers responded to Members’
questions, the Committee unanimously agreed to suspend Standing Order 83,
Page 8

Page 9

given that the motion represented a relevant and material change in circumstances
and agreed:  
i)  to note the allocation of newly Qualified Teachers (NQT's) to date including
additional offer from the Scottish Government; and    
ii) that any secondary subject vacancies arising due to NQTs not taking up a
place in Moray, are advertised as main grade teaching posts on a permanent
basis, subject to any additional financial permission required from Moray
Council in terms of potential future budget pressures. 
8.         Analysis of Secondary School Leavers Attainment 2020-2021 
Under reference to paragraph 7 of the minute of the meeting of 24 November
2021 a report by the Depute Chief Executive (Education, Communities and
Organisational Development) informed the Committee of the SQA leaver
attainment across the secondary schools and for this data to be fully scrutinised as
par of the raising attainment and improvement strategy.  
Following consideration the Committee agreed to:  
i) note the Senior Phase Leaver Attainment across the Secondary Schools in
Moray for session 2020/21 with specific regard to the National Measures for
leavers published on Insight in February 2022;      
ii)  note the actions for improvement arising from the 2020/21 attainment
performance; and 
iii) acknowledge and commend practitioner commitment, extensive preparation
and support of young people throughout the session as the return to an
examination based model as well as young people’s resilience and
dedication throughout last session’s Alternative Certification Model period.      
9.         Moray Education Early Learning and Childcare Income Generation 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) informed the Committee of the success of the Early
Learning and Childcare (ELC) top up hours currently being offered at Linkwood
Nursery and to seek approval to extend the ELC top up offer to all year round
services in Moray.  
Following consideration the Committee agreed to:  
i)  note the ongoing success of the ELC top up hours at Linkwood Nursery,
Elgin; 
ii) the extension of the top up offer to include all year round settings.  This
would also extend to offering to up hours on the occasional day within each
Associated School Group (ASG); and    
iii) note that the impact of the above offer will be assessed as part of the
ongoing work to manage the cost of the ELC service downward to come
Page 9

Page 10

within budget and any future adjustments will be considered based on the
operating experience and income generated.    
10.         Q4 2021-22 Performance Report - Education - Period to March 2022 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) informed the Committee of the performance of the
service for the period to 31 March 2022.  
Following consideration the Committee agreed to:  
i) note performance in the areas of Service Planning, Service Performance and
other related data to the end of March 2022; and    
ii) note the actions being taken to improve performance where required. 
11.         Education Revenue Budget Monitoring to 31 March 2022 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) informed the Committee of the budget position for
Education as at 31 March 2022.  
Following consideration, the Committee agreed to:  
i) note the budget position at 31 March 2022; and    
ii) the revised carry forwards on Appendix 2.  
Councillors Mustard and Robertson left the meeting at the conclusion of this
item.  Councillor McLennan took over as Chair for the next item.  
12.         Instrumental Music Tuition Funding Allocation 
Under reference to para 13 of the minute of the Education, Children's and Leisure
Services Committee on 24 November a report by the Depute Chief Executive
(Education, Communities and Organisational Development) provided the
Committee with a further update on proposals regarding the expansion of the
Moray Music Instruction Service.  
Following consideration the Committee agreed:  
i) note the outcomes of the consultation with children and young people and
their families and carers to determine demand across a number of different
musical instruments; 
ii) recommend to Corporate Committee on 14 June 2022 to allocate the
additional funding of £35,000 from the Scottish Government towards an
expansion of music making opportunities across Moray for academic year
2022/23; 
iii) allocate the funding as per option B at para 3.9; and 
Page 10

Page 11

iv) defer any further decisions on the expansion of the Music Instruction
Service until the long-term funding position is known. 
Councillors Mustard and Robertson re-joined the meeting following the conclusion
of this item and Councillor Robertson resumed the role of Chair  
13.         Education Resources and Communities and Education Capital
Budget Monitoring Report 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) informed the Committee of projects actual
expenditure for Capital Budgets within Education, Children's and Leisure Services
for 2021/22.  
Following consideration the Committee agreed to note the contents of the report.  
14.         Education Resources and Communities Revenue Budget Monitoring
to 31 March 2022 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) informed the Committee of the budget position for
Education Resources and Communities as at 31 March 2022.  
Following consideration the Committee agreed to note the budget position at 31
March 2022.  
15.         Q4 2021-22 Performance Report - Education Resources and
Communities - Period to March 2022 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) informed the Committee of the performance of the
service for the period to 31 March 2022.  
Following consideration the Committee agreed:  
i) note performance in the areas of Service Planning, Service Performance
and other related data to the end of March 2022; and     
ii) note the actions being taken to improve performance where required.  
16.         Whole Family Wellbeing Fund 
A report by the Chief Officer, Health and Social Care Moray sought homologation
of the decision made by the previous Chair and Council Leader on the spend of
the money made available to families in Moray.  
Councillor McLennan sought agreement to include an additional recommendation
which stated that the Committee note the challenge of SIMD only as a means of
distribution of funds, whilst also asking for consideration of other factors such as
rurality to be discussed before distributing such funds.    
As there was no one otherwise minded and following further consideration the
Committee agreed to:  
Page 11

Page 12

i) homologate the decision made by the previous Chair and Council Leader
with regards to the spend on the Whole Family Wellbeing Fund, within
social work as Section 12 (Social Work Scotland) Act 1968 and Section 22
payments (Children (Scotland) Act 1995) for families in financial and
immediate need; 
ii)  note that a paper will be prepared for the Scottish Government on how the
money has been distributed; and       
iii)  note the challenge of SIMD only as a means of distribution of funds, whilst
also asking for consideration of other factors such as rurality to be
discussed before distributing such funds. 
17.         Children and Families Social Work Services Revenue Budget
Monitoring to 31 March 2022 
A report by the Chief Officer, Health and Social Care Moray informed the
Committee of the budget position for Children and Families Social Work Services
as at 31 March 2022.  
Following consideration the Committee agreed to note the budget position at 31
March 2022.  
18.         Q4 2021-22 Performance Report - Children and Families and Criminal
Justice Social Work - Period to March 2022 
A report by the Chief Officer, Health and Social Care informed the Committee of
the performance of the service for the period to 31 March 2022.  
Following consideration the Committee agreed:  
i) note performance in the areas of Service Planning, Service Performance and
other related data to the end of March 2022; and    
ii) note the actions being taken to improve performance where required.  
19.         Question Time *** 
Under reference to para 4 of the Minute of the meeting of 9 March 2022, Councillor
Warren sought an update on the timing of the payment of the free school meal
payments to senior pupils and the petition process to allow the Council to accept
petitions from younger people.  
In response, the Head of Governance, Strategy and Performance confirmed that
the petition process is being reviewed during the summer recess.  
In regards to the timing of the payment of free school meals, the Head of
Education advised that work is ongoing with colleagues in catering but was unable
to confirm a timeline for the conclusion of the work.  
Under reference to para 14 of the minute of the meeting of 9 March 2022,
Councillor Warren sought an update on the appointment of an external consultant
to undertake a review of the Early Learning and Childcare Service.  
Page 12

Page 13

In response the Continuous Improvement Officer (Early Years) confirmed that a
consultant has now been appointed and it anticipated that an update will be
provided to Committee in October.  
Councillor McLennan sought clarification on how much value there is in comparing
the Council schools against the artificial constructs of the Northern Alliance in
which the other authorities are much larger than Moray.    
He further sought clarification on what support do the Northern Alliance provide to
assist the schools and what is the cost benefit analysis of both the inputs from the
Northern Alliance and National Education Agencies who are tasked with
supporting improvements in Education.  
In response the Head of Education confirmed that the comparison with the
Northern Alliance was done as part of developing and reviewing attainment papers
and it was a request from the previous Council that the comparisons were made as
this had not been done previously.  
She further added that if these comparisons are not helpful, the comments made
can be taken away and the information presented in a way that provides a better
comparison.  
With regards to the cost benefits, this would require further work a report back to
Committee at a later date.  
Councillor McLennan further sought clarification on whether there was a value in
officer time in comparing Moray schools with the Northern Alliance and would the
time be better spent comparing with national figures and the virtual comparator,  
In response, the Head of Education confirmed that she would go away and look at
the issue and consider the pros and cons of the current comparisons and discuss
further with members at an attainment briefing.  
Councillor Williams left the meeting during the discussion of this question.  
Councillor Keith sought an update on what the Council is doing to encourage the
young people in the area to take up the free bus travel passes as Moray has
currently only issued to 26% of those eligible which is below the national average.  
In response, the Head of Education confirmed that the Council has been very pro-
active in encouraging the uptake.    
The Depute Chief Executive (Education, Communities and Organisational
Development) further added that work is also being done via the Wellbeing
Partnership to promote the scheme.  
20.         Early Learning and Childcare - Lease Update and Proposed Share
Property Costs Methodology [Para 9] 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) informed the Committee of the options for the
proposed methodology for shared property costs related to lease agreements with
private and third sector providers. 
Page 13

Page 14

To also inform the Committee of plans for further consultation with private and third
sector providers related to the proposed shared property costs methodology and to
update the Committee on lease agreement progress for private and third sector
Early Learning and Childcare (ELC) providers that currently operate from Moray
Council premises. 
Following consideration the Committee agreed: 
i) note the options highlighted in Appendix 1 for approaches to a proposed
methodology for share property costs and that all options including yearly
percentage increase increments be included in the consultation;       
ii) notes that further consultation exercises are required with private and third
sector Early Learning and Childcare (ELC) providers regarding share
property costs, following which an updated report will be submitted to
Committee with recommendations to consider; and 
iii)  note the updated status of lease agreements as outlined in Appendix 2. 
Page 14

Page 15

REPORT TO:   EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 24 AUGUST 2022 
SUBJECT: CHILDREN AND FAMILIES SOCIAL WORK SERVICES
REVENUE BUDGET MONITORING TO 30 JUNE 2022 
BY:  CHIEF OFFICER HEALTH AND SOCIAL CARE MORAY 
1. REASON FOR REPORT 
1.1 To inform the Committee of the budget position for Children and Families
Social Work Services as at 30 June 2022. 
1.2 This report is submitted to Council in terms of Section III (A) (2) of the
Council’s Scheme of Administration relating to the consideration of capital and
revenue budgets and long term financial plans. 
2.  RECOMMENDATION 
2.1 It is recommended that Committee scrutinises and notes the budget
position at 30 June 2022 
3. BACKGROUND 
3.1 The report highlights those areas of the budget where there is a significant
percentage variance identified at 30 June 2022. 
4. BUDGET POSITION 
4.1 The spend at 30 June 2022 is £5,316,000 against a budget to date of
£5,579,000, giving an underspend of £263,000 as shown in Appendix 1. 
4.2 Corporate Parenting and Commissioning has an underspend of £272,000. A
contract for residential care in Moray ended in March 2021 generating an
underspend of £573,000, a report recommending the re-investment of this
underspend was approved at Education, Children’s and Leisure Services
Committee on 26 January 2022 (para 10 of the minute refers). Part of the re-
investment was in two new contracts, the delay in procuring these has
generated an underspend of £128,000, furthermore due to children
transitioning to adult services there is an underspend on the children with
disabilities residential contract of £79,000 at the end of quarter 1. There are
additional underspends on adoption allowances and legal fees £19,000. There
is also one-off income for adoption placements in Moray of £33,000.
Item 5.
Page 15

Page 16

4.3 Currently Childrens Services is forecase to have a one-off underspend overall
in 2022-23 of £600,000 due to young people with disabilities in residential
care transitioning to adult services and the delay in contract procurement as
outlined above. The service is progressing with tendering a new contract and
reviewing the needs of all young people with a disability. 
4.4 Officers are comfortable that the underspend reflects both responses to our
children, young people and their families changing needs and also reflects
some of the capacity needed within the budget to respond as we may or may
not be required to. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement 
Plan (LOIP)
The Children’s Services Revenue Budget has particular reference to
National Outcome 8 – we have improved the life chances for children,
young people and families at risk. 
(b)  Policy and Legal
The Council has statutory responsibilities to meet educational
needs, the needs of children and young people in need and those it
looks after. 
(c)  Financial implications
The resource implications are set out in this report and at Appendix 1.
The underspend as at 30 June 2022 is £263,000 against a budget to
date of £5,579,000. 
(d)  Risk implications
Budget Managers are aware of their responsibilities for managing
budget allocations and approval for any variances will be sought from
Committee in line with the Financial Regulations. 
(e)  Staffing implications
There are no staffing implications associated with this report. 
(f)  Property
There are no property implications associated with this report. 
(g)  Equalities/Socio Economic Impact
An Equality Impact Assessment is not needed because the report is to
inform the Committee on budget monitoring. 
(h)  Climate Change and Biodiversity Impacts
No climate change and biodiversity impacts arise directly from this report.  
Page 16

Page 17

(i) Consultations
Paul Connor, Principal Accountant and Tracey Sutherland, Committee
Services Officer, have been consulted and are in agreement with the
contents of this report where it relates to their areas of responsibility. 
7. CONCLUSION 
7.1 That Committee scrutinises and notes the budget position as at 30 June
2022. 
Author of Report: Tracy Stephen, Acting Head of Children’s Services 
Nicky Gosling, Accountant
Background Papers: With authors 
Ref:  SPMAN-305227695-14 / SPMAN-305227695-15 
Page 17

Page 18

Page 18

Page 19

Children and Families Social Work Services Appendix 1
Budget Monitoring Report to 30th June 2022
Service
Revised
Budget 
Budget to
Date 
Actual to
Date 
Variance to
Date  Variance
£'000  £'000  £'000  £'000 %
Children Services and Criminal Justice Management 55              27              27                  - -
Quality Assurance Team 264 97 93 4 4 %
Locality Planning Pilot 87 44 44 - -
Children's Services Area Teams 4,389 993 1,001 (8) (1)%
Corporate Parenting & Commissioning 13,585 4,508 4,236 272 6 %
Justice Services 442 59 57 2 3 %
Reviewing Team 327 79 79 - -
Children Services Additional Funding 339 (228) (221) (7) -
Efficiency Savings-Children's Services (199) - - - -
-
Children's Services Total 19,289 5,579 5,316 263 -
Item 5.
Page 19

Page 20

Page 20

Page 21

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 24 AUGUST 2022 
SUBJECT: EDUCATION NATIONAL IMPROVEMENT FRAMEWORK
REPORT AND PLAN 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To advise Committee of the annual National Improvement Framework (NIF)
plan return which is submitted to the Scottish Government by the end of
August. 
1.2 This report is submitted to Committee in terms of Section III (D) (1) of the
Council's Scheme of Administration relating to all the functions of the Council
as an Education Authority. 
2. RECOMMENDATION 
2.1 It is recommended that Committee:- 
(i) scrutinise and note the contents of the Moray Self-evaluation
document and National Improvement Framework Plan; 
(ii) recognise the work progressed in a year of significant Covid-19 
disruption, staff absence and reduced capacity due to vacancies; 
(iii) recognise the resilience and dedication across the wider Education
service to continue to provide creative learning experiences and to
improve service offer where this has been possible given
restrictions; and 
(iv) agrees the annual National Improvement Framework (NIF) which
includes the Executive Summary return to be submitted to Scottish
Government by 31 August 2022. 
3. BACKGROUND 
3.1 The NIF for Scottish Education was launched in January 2016.  The
framework supports the Scottish Government Ambition to achieve excellence
Item 6.*
Page 21

Page 22

and equity for every child in Scotland and guides on the Raising Attainment
for All (RAFA) agenda.  It places a legal duty on local authorities to actively
address the poverty related attainment gap. 
3.2 The Framework is underpinned by a series of planning and reporting duties
designed to support transparency and accountability.  These legal duties have
been integrated into the Standards in Scotland’s Schools’ etc Act 2000
through amendments contained in Part 1 of the Education (Scotland) Act
2016.  The Scottish Government produces annual advice in December to
provide the focus for the NIF for the following year.  Prior to December 2021
there were 4 key priorities for action however the 2022 NIF has been updated
with the following 5 priorities: 
• Placing the human rights and needs of every child and young person at
the centre of education
• Improvement in children and young people’s health and wellbeing
• Closing the attainment gap between the most and least disadvantaged
children and young people:
• Improvement in skills and sustained, positive school-leaver
destinations for all young people. And
• Improvement in attainment, particularly in literacy and numeracy 
3.3 The Scottish Government has published statutory guidance to support
education authorities to carry out the legal responsibilities. The statutory
guidance clarifies how the 2000 Act has been amended through 
the 2016 Act in order to: 
• impose duties on education authorities to enhance equity and promote
a reduction in inequalities of educational outcome experienced by
pupils as a result of socio-economic disadvantage;
• impose a duty to secure improvement in the quality of school education
with a view to achieving the strategic priorities of the NIF; and
• impose duties in relation to annual planning and reporting; and annual
school improvement planning 
3.4 Local Authorities must produce a NIF work plan on an annual basis which is
then submitted to Scottish Ministers.  The purpose of the plan is to outline key
actions that the Local Authority will take to address the excellence and equity
agenda.  The Education Strategic Plan 2020-23 provides a vision for the
Education department and for associated officers within Education Resources
and Communities.  Although the key priority areas do not exactly match the
NIF priorities, there are clear links and associated actions within the service
plan, cross referenced throughout.  Officer work plans are reviewed annually
with progress monitored by the Education, Children’s and Leisure Services
Committee on a quarterly basis. 
3.5 Head Teachers are also expected to produce an Annual School Improvement
Plan (SIP) which takes forward developments at a local level.  These plans
are informed by the NIF, the appropriate Local Authority strategic plan
(Corporate Plan, Moray Children’s Services Plan, Education Strategic Plan
etc).  The plans are submitted by 30 June each year and are subject to
Page 22

Page 23

scrutiny by the Quality Improvement Team.  All Moray SIPs are aligned with
the NIF and local priorities 
3.6 The NIF plan is expected to be in place by the end of August each year. 
3.7 In Moray, Officers and Head Teachers have continued to lead positive work in
spite of the pandemic and raising attainment has been high on the agenda for
all.  This is particularly challenging given the context of lockdown and
disruption with positive cases and periods of self-isolation.  The impact of the
pandemic cannot be underestimated however with local evidence of an
impact on behaviours of children and young people and the loss of education
during the 2 lockdowns has impacted negatively on Achievement of
Curriculum for Excellence levels in numeracy and literacy at key stages ie P1,
P4 and P7.  Although additional staffing was provided to support recovery, the
absence of staff over the course of the last year has been significant with
additional staff being used to keep schools open rather than undertake
targeted interventions.  There was significant disruption to learning due to
Covid outbreaks and absence and this will have had an impact on children’s
learning experiences and attainment.  Although remote learning was provided,
not all children and young people were able to undertake this due to illness or
other reasons. 
3.8 Over the course of session 2021-2022, central Officers were relocated to
schools and nursery settings in order to keep as many schools and nurseries
open.  This impacted on the ability to take forward key work as part of our
strategic priorities as previously reported to Committee. 
3.9 The Education Strategic Plan 2020-23 was developed during the pandemic as
a result of a review of the 2018-21 plan as well as the bridging plan for
Education Recovery over the summer of 2020 to the latter part of the year. 
The Education Plan captures a combination of key strategic areas for
improvement as well as aspects of development that will deliver the NIF
priorities. 
3.10 The Moray Education Self-evaluation 2021-22 document in Appendix 1,
gives a fair and balanced overview of the Education Service and the
improvement journey over the course of the last year and in particular, the
ongoing impact of Covid-19 on children, young people and families in Moray
as well as highlighting progress in key areas and next steps.   
3.11 The NIF Plan 2022-23 is shown as an executive summary on the final page of
the Self-Evaluation document.   Officers report progress over the course of
the year to Committee through various reports including performance,
attainment and achievement.  The Executive Summary illustrates a high level
plan which is then supplemented by a suite of operational work plans
produced by Officers and monitored by senior Officers.  It should be noted
that this work sits across the wider Education Service incorporating both
Education and Education Resources and Communities teams. Committee is
aware of the capacity issues within central teams and Officers will be ensuring
that work plans include the key priorities.  Care has been taken to identify key
priorities and development work which can be progressed within current
Page 23

Page 24

capacity and will have potentially maximum outcomes measures which will
contribute to the NIF. 
3.12 Committee is reminded that there was no National collection of Curriculum for
Excellence Achievement of a Level (ACEL) in 2020 due to Covid-19.  From
August 2021 there was a return to ‘normal’ reporting arrangements with ACEL
returns and moderation processes currently being completed to meet Scottish
Government deadlines. 
3.13 As part of the NIF, Pupil Equity Funding (PEF) has been provided for almost
all Moray schools. A separate report to this Committee provides information
regarding the Scottish Attainment Challenge and the range of local funding
received. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
This report was informed by the priorities within the Corporate Plan and
10 Year Plan and in particular to Our People, Our Place and Our Future
and A Growing and Diverse Economy and Building a better future for our
children and young people in Moray. 
(b) Policy and Legal
The Education Act and Standards in Scotland’s Schools Act have been
adhered to. 
(c) Financial implications
The cost of all improvement actions are undertaken within schools
existing budgets and through the central Education budget.  Any
additional funding has been through Pupil Equity Fund (PEF) allocations
as well as any additional Covid-19 grants received. 
(d) Risk Implications
Covid-19 absence continues to impact on service and service delivery
which could have a negative impact on progress throughout the session. 
Vacancies in key strategic roles will also have an impact.  Lack of
progression in recruiting additional Research and Information Officer to
support Education’s plan to explore Power BI to improve data access,
and reporting.  Potential risk that even with the planned work, the
Council does not close the poverty related attainment gap. 
(e) Staffing Implications
Staff absence, including those in leadership roles, has an impact on the
ability to improve service offer. 
(f) Property
There are no property issues arising from this report. 
(g) Equalities/Socio Economic Impact
The National Improvement Framework is aimed at reducing inequalities. 
Page 24

Page 25

(h) Climate Change and Biodiversity Impacts
None 
(i) Consultations
The Head of Education Resources and Communities, the Head of
Financial Services, Head of HR, ICT and OD, Quality Improvement
Manager, the Business Support Team Manager, and Tracey Sutherland,
Committee Services Officer, have been consulted on this report and
agree with the sections of the report relating to their areas of
responsibility. 
5. CONCLUSION 
5.1 Committee is asked to review the evidence provided in the NIF return
documents, acknowledge the continued impact of the pandemic and
agree the submission to Scottish Government due by the end of August
2022. 
Author of Report: Vivienne Cross, Head of Education
Background Papers: National Improvement Framework  
Ref: SPMAN-1315769894-325 / SPMAN-1315769894-326 
Page 25

Page 26

Page 26

Page 27

Appendix 1
Moray Education
Self-evaluation 2021-2022
Improving Outcomes…for Moray’s children and young people
Dallas Primary School
Outdoor Learning Polycrub
Craigellachie Primary School
Art Sketching at Craigellachie Bridge
Rothes Primary School
P5/P6 Residential Trip 2022
St Gerardine Primary School
P1 Problem Solving
Item 6.*
Page 27

Page 28

Moray Council | Fair | Ambitious | Improving | Responsive  2
Table of Contents 
Item Page
Our Moray Context 3
Our Improvement Journey 4
Our Service and Structure 6
Leading through change:  Covid-19 9
Our Moray Education Priorities 13
Improving Outcomes for all 14
Curriculum 18
Learning, Teaching and Assessment 19
Supporting all Learners 20
Leadership 21
Self-evaluation for self-improvement 22
Celebrating Success 23
Executive Summary – NIF Action Plan 2022/2023 24  
Lossiemouth High School Campus – Summer 2021
Page 28

Page 29

Moray Council | Fair | Ambitious | Improving | Responsive  3
Our Moray Context 
Moray Council is the eighth largest council by land area in Scotland. In June 2020, the population of Moray
was 95,710 (22nd out of 32 Scottish local authorities). Moray is a Scottish Attainment Challenge Universal
programme local authority. There are 46 primary schools and 8 secondary schools located across Moray.
One Primary school, Inveravon is currently mothballed with no children attending. Children with
additional support needs receive the support they require within mainstream schools although some may
attend an Enhanced Provision Unit for some or all of the time. In Moray, approximately 37% of pupils in
Primary and 42% in Secondary are recognised as having additional support needs, which is higher than
the national average. 
Moray now has areas identified as being in Scottish Index of Multiple Deprivation (SIMD) decile 1, with
families now living in decile 1 following Scottish Government reclassification. Four areas in Moray are
ranked about the most deprived in Scotland.  One datazone now has 158 pupils in SIMD decile 1 which
indicates that an increasing number of children and young people are living in poverty within Moray. This
is also the case for some relatively remote communities in the area. 
Moray has attainment gaps in the upper deciles, specifically decile 7 where 25% of our cohort resides.
11.98% of pupils are eligible for free school meals (FSM).  Approximately 57% of the population live in the
5 main towns of Elgin, Forres, Buckie, Lossiemouth and Keith.  Population estimates suggested that two
thirds of the Moray population are of working age, one fifth are aged under 16 years and the remaining
one fifth are of pensionable age. This year’s census will provide more up-to-date information. 
As an authority keen to further improve, Moray Education’s core aim is to raise attainment across our
schools and Early Learning centres in order to improve outcomes for all Moray’s children and young
people, ensuring progression to positive and sustained school leaver destinations.   
Page 29

Page 30

Moray Council | Fair | Ambitious | Improving | Responsive  4
Our Improvement Journey 
Session 2021/2022 started with the impact of Covid-19 evident in absence figures for staff and pupils
growing over the course of the year.  Mitigations continued to be in place with regular changes in
Scottish Government Guidance having to be implemented.  Learners across Moray were increasingly
adversely impacted by requirements to self-isolate or through disruption due to positive cases.  As a
result this led to a number of establishments having to move to remote learning due to full or partial
closures.  Disruption to learning was evident although schools and nurseries worked tirelessly to ensure
continuity in learning and all staff played a vital role in this. 
The service maintained a positive outlook with a renewed sense of ambition as we emerged from Covid-
19 enhanced mitigations.  Visitors were able to return to buildings in order to support learners and
leaders, working closely with staff teams, looked for opportunities to provide rich learning experiences
for learners including greater use of the outdoors and the ability to undertake trips and residential
experiences as the year progressed. 
Meeting the needs of our learners was at the forefront of our minds
as we moved from recovery to an increased focus on the Education
Strategic Plan.  New appointments centrally have supported key
areas and workstreams in order to highlight priority areas.  As
Education Scotland offered opportunities to work more closely with
the profession around Education recovery, a number of schools and a
nursery volunteered to participate in review visits which have
contributed positively to their improvement journeys.
The Strategic Plan has provided a backdrop for virtual strategic
sessions with school leaders.  Officers have continued to progress
work in each area guided by input from our schools and
practitioners.  In particular the Raising Attainment Strategy is under
review with a complimentary Insight and Curriculum Strategy to
improve data literacy across our system.  Key messages will inform
our next steps as we finalise our attainment targets and strategic
viewpoint.  National reviews have been completed during the year
and will play a key role in workstreams moving forwards. 
Buckie High School
Community Larder
Cullen Primary School 
Vision and Values Canvas
Elgin Academy
Biology Field Trip
Page 30

Page 31

Moray Council | Fair | Ambitious | Improving | Responsive  5 
We continue to see the impact of the pandemic on the lives of all children, young people and families
across Moray.  There has been a major increase in the number of children referred to our Counselling
service and due to the feedback in our Staff Health and Well-being survey there is a greater offer of
support now available to all staff through our Human Resources and Organisational Development teams
working closely with us to provide support for staff.  This self-evaluation review therefore extends more
widely than the limited scope of our National Improvement Framework plan and includes: 
• Progress made over the last year
• The impact of Covid-19 on children, young people and families in Moray
• How service requirements will continue to adapt and be flexible to deliver improved outcomes
for all 
The Education Strategic Plan reflects the four National Improvement Framework priorities and the
accompanying document outlines our National Improvement Framework Plan and Education Service
plan.  In Moray, through the National Improvement Framework drivers our aims are: 
All School Improvement Plans and agreed Working Time Agreements continue to reflect the key
priorities outlined above, with increased focus on rejuvenation, renewal and revitalisation as we
navigate from pandemic to endemic.   Increasingly our Early Years teams will work alongside us so that
there is seamless transition across our service.  We recognise the importance of partnership working
across our schools and establishments, where everyone has a role to play.  Learners remain at the
centre of all that we do where the role of wider partners is not underestimated in ensuring the best
outcomes for all children, young people and families. 
Findochty Primary School
First Minister’s Reading Challenge
Portgordon Primary School
Environmental Arts Session
Elgin High School
Awards Ceremony 2022
Page 31

Page 32

Moray Council | Fair | Ambitious | Improving | Responsive  6
Our Service and Structure 
Moray Education sits within the wider Education, Communities and Organisational Development section
of the Moray Council.  Furthermore, Education governance is overseen by two Heads of Service
reporting directly to the Deputy Chief Executive.  Children’s Social Work Services are currently
transitioning to the Moray Integrated Joint Board (IJB) with an interim Head of Service leading this work. 
Within Moray Education, a number of Service Managers and team members lead aspects of Service
delivery overseen by the respective Head of Service:  Head of Education (Chief Education Officer) and
Head of Education Resources and Communities.  These include: 
Education Education Resources and Communities
• Head Teachers
• Nursery Managers
• Early Years’ Service Manager
• Project Manager – ELC Expansion
• Quality Improvement Managers
• Head Teachers 
• Quality Improvement Officers
• Primary Advisor 
• ELC Continuous Improvement Officers
• Principal Teacher – Early Years 
• Nursery Managers
• Early Years Teachers
• Early Years Officers
• Childminder Development Officer
• Learning Technologists
• Principal Educational Psychologist
• Educational Psychology Team
• Business Support Team Manager
• Business Support Team
• Sport and Culture Service Manager
• Principal Librarian
• Principal Teacher - Music Instruction and
Performance
• Programme Manager – Learning Estate
• HT SEBN and Team
• QIO/ESO ASN
• Communities Service Manager
• Communities Service Team
• Learning Estate Project Manager/Team
• Principal Active Schools/Community Support
Officer
Page 32

Page 33

Moray Council | Fair | Ambitious | Improving | Responsive  7 
The core Education department overseen by the Head of Education (Chief Education Officer) has
continue to face change at officer level.  Over the session there has been a considerable movement in
school senior leadership post appointments.  Providing vital support to schools and nurseries during
Covid disruption has meant great challenge in balancing operational and strategic work.  However, in
spite of the challenges, we are proud that the Education Service has: 
KEY SUCCESSES OVER SESSION 2021-2022
• delivered the flexible expansion of Early Learning and Childcare including setting our sustainable
rate for our partner providers (including 37 funded childminders) and a new leasing agreement
• delivered a successful Summer and Easter of Play Programme
• delivered an Easter Study offer for our young people across the senior phase
• working with our schools and in partnership with Education Scotland, SDS, DYW and Moray
College UHI reviewed our approaches to Senior Phase curriculum and offer, looking outwards for
improvements in curriculum breadth and exploration of further consortia, virtual and
partnership approaches in line with emerging guidance from key National reviews
• continued to develop our approaches to data literacy across our system with planned revised
approaches to attainment and achievement target setting across our schools and system.
• sent 32,500 free school meal vouchers to eligible families to ensure they had a meal during
lockdown or movement to remote learning
• expanded the provision of free school lunches in line with Scottish Government expectation
• implemented a number of service structure reviews in Education Resources & Communities
including a new Learning Estate Team, an enhanced Community Learning and Development
Team and a new Sport and Culture Service
• started a timely review of Additional Support Needs with a clear governance and project
management structure in place to support this
• built on the successful virtual communication structure in place with senior leaders and nursery
managers by introducing opportunities for professional development and learning around key
policies and support from Corporate services
• built on the success of the Alternative Certification models by preparing for the delivery of a full
exam diet again in 2022 which included a success learning experiences akin to prelims (LEAP)
programme
• developed our training programme for ELC staff and early intervention teachers including Early
Talk Boost, Makaton, SCERTS and Earlybird which is being rolled out across the service to upskill
staff and better meet the needs of our youngest learners
• provided a comprehensive training programme to support our Play pedagogy strategy to
improve and embed practice initially across Early Level with almost half of our primary schools
engaged in the programme and all ELC establishments
• developed our Parental Engagement and Involvement Strategy with wide participation sessions
particularly with a range of parents and partners
• developed a Supporting all Learners strategy which will be supported and implemented next
session
• undertaking a review of our Professional Leadership and Learning strategy
• removed almost all costs of the school day for parents and carers
• commissioned Exchange to offer a year round counselling offer for our children and young
people and SONAS, a wellbeing service providing a range of preventative/support interventions
• working with partners, introduced Wellbeing Coordinators, strengthened our locality networks
and updated the governance across Children’s Services
Page 33

Page 34

Moray Council | Fair | Ambitious | Improving | Responsive  8 
There continues to be a period of change management and transformation which include: 
• A continued review of Additional Support Needs (ASN) with identified workstreams now
progressing
• The Business Support admin review and other transformational projects
• Supporting the digital inclusion agenda
• Further development of our Learning Estate Strategy
• Early Years STEM work as part of Moray Growth Deal 
Working in isolation is not conducive to service delivery and particular thanks is given to core Council
departments which have added value to educational delivery over the course of the last year.  As
structural changes continue to be embedded, partnership working will strengthen with clear emerging
cross-cutting themes and priorities to lead service improvement.  A revised governance structure for
wider Children’s Services is being established and will bring greater cohesiveness and collaboration to
achieve improvements within localities.   
We are committed to providing a clear structure to support improvement and will continue to work
across the system and provide strategy and guidance. The engagement of all families and communities
in committing to improving educational outcomes is vital to ensure improvement. 
As we look to the future, challenges remain on the horizon with the National Education Reform and
Conversations as well as locally the necessity to ensure Best Value for all of Moray’s learners as we
consider the financial constraints as a Council. 
Stramash Outdoor Nursery
Strathisla Children’s Centre
Lady Cathcart Nursery
Cullen Nursery
Page 34

Page 35

Moray Council | Fair | Ambitious | Improving | Responsive  9
Leading through change:  Covid-19 
Session 2021/22 commenced with a return to establishments with continued restrictions in place.  Risk
assessments continued to be part of the routine as leaders worked with professional bodies to ensure
the safety of staff, pupils and visitors.  Schools supported vaccination and booster roll out with local
partnerships ensuring that our young people were vaccinated in situ. 
From summer to October, disruption was minimal with the occasional isolated case.  However from
October 2021 through to March 2022 the number of positive cases increased with senior Education
Officers supporting the risk assessment process for contact tracing.  Throughout, Moray had one of the
highest rates of uptake across staff and learners for asymptomatic testing which helped to reduce
outbreaks, limit staff absence and identify positive cases quickly. 
In spite of the efforts to safeguard against Covid-19, the winter saw an increase in positive cases with
daily senior officer reporting to the Corporate Management Team and elected members with growing
disruption across the service to learning including high staff absence which impacted on the continuity
of provision.  This led to classes, year groups and nurseries moving to remote learning as well as central
officers being re-deployed to schools in order to support continuity of service.  Additional Covid staffing,
to support recovery and interventions for learners were being used to keep schools operational.  For
some learners there were multiple self-isolation periods which had a major impact on their attendance,
learning and also opportunities to socialise with peers. 
Almost all senior leaders routinely managed Covid-19 cases and outbreaks and were class committed
which impacted on their ability to provide strategic leadership for school improvement.  Staff absence
has fluctuated, again with some having multiple absence episodes.  It is noted from records that there is
a 3-year trend of reasons for absence which include stress, anxiety and depression.  Working with our
Human Resources colleagues, an enhanced programme of support has been put in place which has been
positively received.  This supplements the ongoing pastoral support to leaders and managers from
central officers as well as similar well established supports in our establishments.  As a result staff feel
valued and cared for. 
The impact on learners emerged over the session with mental health and well-being becoming a
concern with increased multi-agency interactions as well as referrals to services including counselling. 
School environments had initially been calm after lockdown however concerning behaviour from a few
children and young people as well as a growing negative attitude towards their education by some
children and young people became clear which impacted on the experience of others.  This was a
concern in a few identified areas of Moray including an increase in anti-social behaviour at weekends
which resulted in the stepping up of local partnership groups with key action plans in place. Disruption
was experienced by some of our secondary schools in particular with fire-raising incidents causing major
damage and requiring multi-agency response.   Some learners continued to be unsettled towards the
end of the year however key projects planned using Strategic Equity and other funding will provide
capacity to support work to address this. 
In addition to the pandemic, the service faced disruption over winter with several storms, as a result of
global warming.  This had an impact on our ability to communicate and use successful remote learning
approaches due to loss of power for several days at a time.  Buildings were damaged and water ingress
had an impact on our learning estate.  The school ICT network was subject to an ongoing cyber attack
requiring local and national mitigations to be enacted in order to safeguard our network.  This resulted
in reduced connectivity and remedial works affecting service.
Page 35

Page 36

Moray Council | Fair | Ambitious | Improving | Responsive  10
Positive approaches to digital learning, embraced during forced lockdowns, have been maintained and
strengthened by the majority of schools however this is still an area to be further developed including
the infrastructure to support this. 
Building on new communication methods with the system’s leaders, weekly virtual briefings continued
across the session.  As well as updates regarding the pandemic and other operational matters, the
introduction of policy support and input from a wide range of colleagues and partners was introduced
which was positively received.  This allowed the opportunity to refresh on process and also to make
connections which add value to the management of establishments or the learning experience of our
children and young people.  Notably, and as part of the Platinum Jubilee celebrations, a link was made
with the local Lord Lieutenancy with the majority of schools registering for the three levels of the Moray
Badge Platinum Jubilee.  This culminated with a celebration of achievement at Gordonstoun with their
Royal Highnesses the Duke and Countess of Wessex in June.  Many children and young people benefited
greatly from this experience.  Moray schools also contributed to the Queen’s Green Canopy by
responding to the call to ‘Plant a Tree for the Jubilee’. 
Recovery and Renewal 
A key focus from August 2021 was to recover, review and renew our approaches to learning, teaching and
assessment within the pandemic restrictions and with an opportunity provided to use the current context
to adapt and amend the curriculum offer.  Across the previous session, Literacy, Numeracy and Health
and Wellbeing had been prioritised with practitioners now looking at the entire Curriculum for Excellence
entitlements. 
Restrictions impacted on the ability to provide stimulating learning experiences and prolonged
pedagogical adjustments which negated opportunities for pair and group interactions as well as peer
learning opportunities.  This also had an impact on pupil socialisation, imposing restrictions on cross year
group learning or class to class interactions.  Credit must be given to those schools and establishments
who creatively planned outdoor or online events to ensure that learning continued to be shared with
parents/carers.  Building on this in term 4, along with much welcomed reduced restrictions, we were able
to open up opportunities again to allow the return of outdoor events, parent and carer attendance and
the resurgence of well-planned interdisciplinary learning experiences.  Transition events were in person
rather than virtual allowing our learners to engage with their new peer group and to see their new learning
spaces.  Celebration events returned and the session ended on a high with a much more ‘normal’ feel to
the school day.  Social media channels and other platforms were well utilised to showcase and celebrate
Moray learners’ unique journeys and experiences across the session. 
Virtual approaches were embraced to support strategic engagement with Head Teachers and senior
leaders.  This included, and where outbreaks allowed, sessions on curriculum, working in partnership with
Education Scotland provided the opportunity to review offer in line with current research and national
guidance around the refreshed narrative.  Feedback was positive with leaders embracing the opportunity
to make use of multiple tools to support conversations with their staff around a post pandemic curriculum
offer.  Learning and service delivery across Moray was supported by a wide range of support services and
staff including Educational Resources teams, learning technologists and wider Council departments.  
Rothes Primary School Mortlach Primary School
Page 36

Page 37

Moray Council | Fair | Ambitious | Improving | Responsive  11
Support and Wellbeing 
The Human Resources staff survey and other data provided us with clear reasons for absence for
teaching, nursery, support and central staff.  Staff had an extended period of time working on the
frontline to deliver services whilst others were able to work from home.  In addition, with restrictions
and the wearing of PPE, many experienced difficulties and increased stress and anxiety.  Social isolation
outwith the work situation as well as within also contributed to how staff were feeling.  As a result the
service worked closely with our Human Resources colleagues to put in place an extended support
programme for staff which was positively received.  We will continue to review this to provide ongoing
support for staff.  Staff are to be congratulated for their continued resilience and commitment to
Moray’s learners as they have adapted to many changes in their ways of working. 
Communication and Collaboration 
We continued to build on approaches to sharing information and providing opportunities for
collaboration.  In some instances, there will be no full return to pre-pandemic ways due to further
emerging good practice as this session progressed.    In Moray Education, this included: 
Communication
Method
Impact 
Head Teacher and ELC
Manager Microsoft
Team
• 2-way real time communication and information sharing including immediate
responses to emerging issues which were vital during outbreaks to support planning
• Immediate requests for information during storm and other outages
• Increased confidence in the use of this repository with easy access to historical
information 
Weekly Head Teacher
Virtual Briefings
• Weekly attendance increasing to 98% across the session with continued
opportunities to undertake well-being checks 
• Introduction of policy updates and partner inputs which added value through
opportunities for professional learning which did not exist through pandemic
disruption
• Continued use of drop-in sessions at end of each meeting to support emerging
queries and concerns
• Continued capacity building with DHTs and vital support for acting HTs
• Emerging practice:   leaders empowered to share practice by leading inputs
• Evidence of enhanced curriculum offer or pupil support with connections made with
partner agencies
• Support for Council wide financial and other systems which were greatly appreciated
and informative
Weekly Friday briefing
– Head Teachers/ELC
Managers
• Review of format with clear national, local and Covid updates – evidence of greater
knowledge across the system of awareness
Communication with
parents/carers, pupils
and staff
• Continued communication with parents regarding restrictions, outbreaks, disruption,
access to remote learning and support for those with children in the senior phase
• Regular letters of thanks to Education staff and support services for their continued
dedication to Moray’s learners
• Letters to senior phase pupils undertaking SQA examinations for the first time in 3
years
Virtual Meetings –
Moray Parent Forum
• Continued termly meetings with Moray Parent Forum (Parent Council Chairs) allowed
us to respond to queries re continued restrictions and management of outbreaks –
attendance has been varied but increased from pre-pandemic times
• Sharper focus on strategic priorities with consultation and engagement on the
learning estate and parental engagement strategies
Page 37

Page 38

Moray Council | Fair | Ambitious | Improving | Responsive12
The culture of collaboration continues to improve across our stakeholder groups.  With regular changes
in the make-up of leaders during the session, they were supported in making key connections and were
able to quickly access critical guidance and procedural documentation and support.  The necessity to
regularly meet and collaborate with professional bodies has continued over the year with positive
interactions and agreement reached regarding local guidance and accepted positions.
Well established use of online platforms has supported those processes put in place to support our most
vulnerable learners and families.  This has allowed multi-agency meetings to be convened in a timely
manner ensuring support is available and decisions made swiftly.  Our Multi-agency Support Hubs
(MASH) have been reviewed across the session and have moved to a Multi-agency Practice Hub (MAPH)
approach which evidences the continued review and development of practice to support individual
learners.
Leaders across the system have maintained and further developed partnerships across the Northern
Alliance and beyond.  Staff in the service supported a review of the Northern Alliance Plan with Michael
Fullan’s 4 right drivers being used to identify future priorities.  This has ensured a greater understanding
of the work of the Regional Collaborative and will be a good foundation as we continue to progress post
pandemic.
Partnership working with the Northern Education Scotland Team has continued with a recent positive
and supportive meeting to share emerging approaches to setting local stretch aims.  A change in our
Attainment Advisor, once again during a period of considerable disruption across the system, was
unfortunate, however recent developments provide a positive scaffold for future joint working.
East End Primary School
Moray Badge 2022
Seafield Primary School
Platinum Jubilee Picnic
Linkwood Primary School
Developing the Young Workforce
New Elgin Primary School
Road Safety Week - JRSO
Greenwards Primary School
P1 Transition – The Learning Hub
Page 38

Page 39

Moray Council | Fair | Ambitious | Improving | Responsive  13
Our Moray Education priorities 
This session a delay in new officer appointments had an impact on
our ability to progress planned actions of our plan.  However, despite
this we have ensured that progress, as evidenced throughout this
document, has been made as we also dealt with the impact of the
pandemic on our ‘business as usual’ workload. 
As reported last session, our strategic priorities focus on the key
areas of: 
• Curriculum
• Learning, Teaching and Assessment
• Supporting All Learners
• Leadership 
Work across these areas will allow us to contribute towards progress
in meeting the National Improvement Framework Priorities.  All staff
are aware of our priorities and regular updates are provided through
Council Committee reporting processes.  The infographic illustrates
the interconnected and interdependent relationship of our critical
priority areas where work on one will rely on and impact upon any
one of the others.   
We continue to change the narrative from ‘the authority’ to ‘in Moray we…’.  All establishments are clear on the
improvement drivers which are evidenced through statutory plans.   In Moray we are committed to improving
outcomes for all our children and young people and will review this plan over the course of the session to set
priorities for Moray Education moving forwards.  This will involve continued focus on gathering key self-
evaluation for system improvement and with attainment and achievement a key priority.  School improvement
plans are quality assured with Quality Improvement visits providing opportunity for scrutiny, support and
challenge of school progress and impact of actions identified.  School and service plans are streamlined with focus
on four key priority areas with core focus on improving outcomes for all, underpinned by robust self-evaluation
for self-improvement.  This approach will be further developed and include our ELC settings. 
Across our Education Service Plan, progress with priorities at year end (March 2022) had been severely disrupted
by capacity issues within the central Education team as well as Covid-19 disruption and supporting schools with
issues identified previously.  As the infographic below illustrates, we remained mainly on target with Performance
Indicators aligned to our Strategic Plan with exception of Service Plan areas where staffing vacancies had been
present aligned to lead roles: 
Page 39

Page 40

Moray Council | Fair | Ambitious | Improving | Responsive  14
Improving Outcomes for All 
We continue to progress with actions for improvement related to attainment as identified in the Best Value
Assurance Report (BVAR) published in August 2020 prepared by Audit Scotland (Accounts Commission).  We
continue to note that this report highlighted a number of key messages across Moray Council and in specific
regard to educational attainment. 
In March 2022, Audit Scotland published a further Progress Report, highlighting the following: 
• A revised raising attainment strategy, which sets out an approach to better understand and improve
educational attainment. The council has maintained a focus on attainment throughout the pandemic
• Improvements in educational attainment will need to be monitored over the longer term with the need
to consider any impacts from the pandemic
• The council has taken measures to improve educational attainment and learner wellbeing over the audit
period, maintaining a focus on this alongside responding to Covid-19
• In November 2020, the council approved a new raising attainment strategy, developed with schools and
practitioners, which includes a section on Covid-19. The emphasis is on working with schools and includes
focused quality improvement work, better understanding of reasons behind poorer attainment,
promoting consistency in quality teaching standards and sharing good practice
• The council estimates that nearly 40 per cent of pupils have additional supports needs. In August 2021,
the council approved an outline business case and action plan to take forward a review of additional
support needs and approved £1.9 million of resources to support this
• A learning estate strategy was approved in October 2020. A project team has been established, including
a community support officer, and will start looking at options for three priority associated school groups
with stakeholders from November 2021. The council successfully bid for learning estate investment
programme funding for Findrassie primary school 
For secondary schools and learners in Senior Phase, the academic session in August 2021 commenced with the
announcements that SQA examinations would resume in May 2022.  As a result, modifications to qualification
content were announced across the year, including additional support materials in March 2022 to support
assessment.  Three scenarios remained for most of the year with ongoing uncertainty around whether
examinations would ultimately take place.  This was confirmed by early 2022 and in January/February 2022,
Moray’s learners engaged in ‘LEAPs’ (Learning Experiences Akin to Prelims) in order to prepare for their first
experience of formal examinations.  Schools worked tirelessly to prepare young people for National Qualifications
and we look to review future attainment and key messages resulting, following two years of Alternative
Certification Models in place.  Schools report a mixed examination experience for young people, with increase in
additional assessment arrangements as a result of their pandemic experience and increased anxieties. 
We continue to analyse the wealth of attainment data we have available with caution, due to direct comparison
being complex due to the varied approaches since March 2020.  It should be noted that over the session,
significant disruption occurred for learners due to necessity to self-isolate, periods of Remote Learning as well as
staff absence.    Attainment data from 2020 is not directly comparable with that of previous years (and only
available for secondary Senior Phase).  Historical data shows an overall improvement in the number of children
and young people achieving CfE levels.  There continues to be local and national evidence to suggest need for a
focus on literacy and numeracy and particularly as we emerge from two separate lockdowns and their impact. 
In anticipation of Scottish Government collection of Achievement of Curriculum for Excellence Level (ACEL) data
for session 2021/2022, we continued to gather key milestone information across our Primary and Secondary
schools.  The impact of Covid-19 is evident through early indication data presented, particularly with regard to
Literacy (Writing) and Numeracy.  This may be explained by the loss of direct teaching for key developmental
learning for Early language skills during the extended period of Covid-19.  Similarly, there are gaps emerging in
some schools which are related to pupil absence, participation and inability to use Covid-19 intervention teachers
for post-lockdown recovery work. 
Page 40

Page 41

Moray Council | Fair | Ambitious | Improving | Responsive  15
Scottish Index of Multiple Deprivation Profile (SIMD) 
The Moray Scottish Index of Multiple Deprivation (SIMD) profile is shown in tabular form below.  SIMD Quintile 1
refers to young people with postcodes within datazones identified as being in the 20% most deprived in Scotland
according to SIMD, whilst Quintile 5 refers to those young people with postcodes in the top 10% of the least
deprived datazones according to SIMD. In the 2016 SIMD Moray had no datazones ranked in the lowest decile 1
(within Quintile 1), however in the refreshed 2020 SIMD Moray has one datazone in decile 1.  From the profile
below, most children and young people in Moray are within Quintile 3 (decile 5 and 6) and Quintile 4 (decile 7 and
8) datazones. 
SIMD (%)
STAGE
No.
Pupils
Quintile
1
Quintile
2
Quintile
3
Quintile
4
Quintile
5 Unknown
P1 945 2.2% 15.9% 30.5% 38.5% 11.0% 1.9%
P4 981 3.3% 16.6% 29.6% 36.2% 13.1% 1.2%
P7 1037 3.9% 14.8% 29.9% 37.1% 13.0% 1.4%                
S3 1077 3.7% 13.3% 32.2% 38.9% 10.5% 1.4%                
S4 923 3.3% 15.6% 30.9% 36.9% 11.6% 1.7%
S5 672 3.6% 10.1% 33.0% 41.4% 10.9% 1.0%
S6 443 3.2% 7.9% 31.8% 42.9% 12.4% 1.8% 
Key Attainment and Achievement measures 
Overall, key Performance and Improvement highlights for Moray are as follows: 
2018/2019 2019/2020 2020/2021
S4:  % pupils attaining level 4 Literacy and Numeracy 78.9% 86.9% 87.1%
Leavers:  % pupils attaining level 4 Literacy and Numeracy 84.9% 86.3% 92.2%
Leavers:  % pupils attaining level 4 Literacy 93.3% 93.0% 95.9%
Leavers:  % pupils attaining level 4 Numeracy 87.2% 88.3% 93.3%
Leavers:   % achieving 5+ @ SCQF5 61.6% 61.9% 65.8%
Leavers:   % achieving 5+ @ SCQF6 29.5% 34.2% 34.3%
Leavers:  1+ @ SCQF4 or better 96.4% 95.2% 96.8%
Looked After school leavers:  1+ @ SCQF4 or better 76.9% 68.4% 75.0%
% of pupils gaining 5+ @ SCQF5 61.0% 59.0% 63.4%
% of pupils gaining 5+ @ SCQF6 32.0% 30.0% 33.6%
Overall Average Total Tariff 815 800 885
Proportion of pupils entering Positive Destinations 92.8% 93.1% 94.1%
% Participation for 16-19 year olds 91.3% 93.5% 91.8% 
Areas for further improvement are identified as follows: 
2018/2019 2019/2020 2020/2021
S4:  % pupils attaining level 5 Literacy and Numeracy 46.2% 53.6% 49.0% 
Where it is noted that improvements have occurred in trend performance, in Moray we continue to focus on key
identified measures as we focus on our raising attainment agenda as reported to Moray’s Education, Children’s
and Leisure Services Committee, with the cycle for Committee reporting noted below.  Attainment as noted
above will be reported to Committee following analysis of September Insight data, in November 2022.  This
includes analysis against National and Virtual Comparators to gauge areas of strength and improvement required. 
Page 41

Page 42

Moray Council | Fair | Ambitious | Improving | Responsive  16 
Achievement of Curriculum for Excellence levels (ACEL) 
ACEL data for secondary school pupils (S3) was not collected by Scottish Government in 2020/2021 and was not
collected for any pupils (P1, P4, P7, S3) in 2019/2020 in recognition of Covid-19 impact on data consistency, fit for
purpose nature and wider external pressures on school and education authority staff.  The impact of Coronavirus
on learner attendance at school, potential disruption due to staff absences and any return to remote learning for
individual or groups of pupils continues to become apparent at this time and as such, may continue to directly
impact future data collection and evidence gathering for ACEL TPJ. Depending on disruption experienced across
other local authorities within Scotland, this may present inequity in data profiles presented due to local
circumstances experienced.  Based on data available, the following areas are identified from Primary ACEL data in
2020/2021 and based on ACEL Early Indication data in session 2021/2022: 
• P1 – Writing (trend)
• P4 – Writing (impact on Literacy overall)
• P4 – Numeracy (trend)
• P7 – Reading (trend)
• P7 – Writing (impact on Literacy overall)
• P7 – Numeracy (trend) 
Kinloss Primary School
UNICEF Silver Rights Respecting School Lossiemouth High School
Senior Student Leadership
Team
Crossroads Primary
School
Nativity
Page 42

Page 43

Moray Council | Fair | Ambitious | Improving | Responsive  17
Attendance
In terms of school attendance, attendance rates appear to show there is a correlation with the SIMD ranking,
where attendance rates are on average lower for young people from the more deprived areas (Quintile 1) when
compared to those from the least deprived areas (Quintile 5). Primary school attendance rates range from 94.2%
(Quintile 1) to 96.9% (Quintile 5), a variance of 2.73 percent. The secondary school attendance rates show a
similar gap in attendance when using SIMD data, with attendance rates ranging from 91.3% (Quintile 1) up to
94.3% (Quintile 5), a 2.96 percent variance. Overall, attendance has shown improvement in session 2021/2022
with gap between Quintile 1 and 5 narrowing from 2020/2021 for both Primary and Secondary.  Gap between
Quintile 2 and 5 is comparable in Primary to session 2020/2021, narrowing marginally for Secondary in session
2021/2022.  It is further noted that attendance continues to be impacted by Covid-19 and wider impact that the
pandemic has brought.   
SIMD  2018-19   2019-20   2020-21  2021-22 
primary secondary primary secondary primary secondary  primary secondary
QUINTILE 1  94.5% 92.7% 91.9% 88.5% 93.4% 90.1%  94.2% 91.3%
QUINTILE 2  94.2% 90.7% 93.1% 88.2% 95.1% 91.7%  95.1% 91.6%
QUINTILE 3  94.7% 90.7% 93.6% 90.4% 96.1% 92.1%  95.7% 92.0%
QUINTILE 4  95.2% 92.5% 94.9% 91.4% 96.7% 94.0%  96.6% 93.6%
QUINTILE 5  95.8% 93.3% 95.3% 92.1% 96.8% 94.7%  96.9% 94.3%
OVERALL  95.0% 91.9% 94.1% 90.6% 96.0% 92.6%  96.0% 92.6%             
Gap Q1/Q5  1.30% 0.60%  3.40% 3.60%  3.40% 4.60%  2.73% 2.96%
Gap Q2/Q5  1.60% 2.60%  2.20% 3.90%  1.70% 3.00%  1.85% 2.75% 
Exclusions 
In Moray, we continue to work towards reduced exclusions in line with our Exclusion Policy and national
guidance.  Where possible, interventions are enacted to ensure all children and young people are included,
engaged and involved in learning activities and supported to achieve their full potential.  The following exclusion
data is noted for Moray Schools (2021/2022 based on the period to March 2022): 
Positive trends in reduction of the number of exclusions is noted across our Moray schools with further analysis of
exclusions to be undertaken for session 2021/2022 (full year) following final data review, noting the status of the
2021/2022 data above.  Given that Covid-19 has resulted in increased anxiety, wellbeing and mental health
related issues arising, the information presented above illustrates a positive position with schools supporting
children and young people within their establishments, working with wider agencies and using internal supports
as an alternative to exclusion and in line with Scottish Government expectations regarding inclusion. 
Page 43

Page 44

Moray Council | Fair | Ambitious | Improving | Responsive  18
Curriculum 
Following two previous sessions with considerable Covid-19
disruption including two discrete periods of National lockdowns,
session 2021/2022 witnessed a return to more normal times in
our schools and ELC settings.  In particular regard to ELC, our Play
Strategy was endorsed by Education, Children and Leisure
Services Committee early in the session and in-person training
sessions were rolled out for ELC and early stage Primary
colleagues across Moray.  Further work is underway with the
Social, Emotional and Behavioural Needs (SEBN) team with
regard to how Play dovetails with Learning, Teaching and
Assessment and Curriculum work.  Continued planning is
underway with further development during in-service scheduled
for increased pan-Moray engagement including play-based
approaches across stages.  Progression Pathways have been
developed for Early Years and working with a newly appointed
Quality Improvement Officer (QIO) for Curriculum for schools, further work is planned to ensure progression and
cohesion. 
As previously stated, an early strategic Head Teacher Meeting focused on the refreshed narrative for Curriculum
for Excellence to allow schools early in the session to review their Curriculum offer in line with National good
practice and local changes in the pandemic.  A range of supportive guidance, toolkits and resources were
provided to support in-school discussion and collaboration.  This included challenge questions regarding
Curriculum content and developing a post-pandemic Curriculum Rationale to meet learners needs, reflective of
local context.  The QIO for Curriculum has mapped all School Improvement Plans and resources in order to
identify key areas to support.  This included work on inter-disciplinary learning (IDL) with a number of resources
now available to support this critical aspect to ensure development of transferable skills.  This session, our schools
have reviewed at local level, progression pathways in place with curriculum delivery extending beyond core focus
areas of literacy, numeracy and health and wellbeing to all curriculum areas.  Moray progressions and pathways
are under development for adoption by schools as required. 
Secondary schools continue to adapt to the changing qualifications landscape and have engaged through
National, Moray, Northern Alliance and local review sessions.  This has included engagement with Education
Scotland’s Curriculum Innovation team and wider work linked to the OECD review and wider Education reform.  A
local authority Insight strategy has been developed working in partnership with our Scottish Government Insight
Advisor, looking outwards to widening our curriculum and qualifications offer.  Working in partnership following
these sessions, we look to further review timetabling structures, curriculum offer and consortia working. Insight
sessions have initially supported discussions by looking outwards across Scotland to possible learner
pathways/curriculum possibilities that may be
achievable.  Sessions were held with key middle and
senior leaders and there is now a greater awareness of
strengths and opportunities to add value to learner
attainment and achievements.  A Quality Improvement
Officer for Curriculum has appointed in order to
support this area of work moving forwards in session
2022/2023 with key plans in place as noted in the NIF
Action Plan and further below with regards to next
steps.  The Education Scotland Curriculum Innovation
team will continue to work with us in order to
strengthen curriculum offer, partnership offer,
consortia and virtual approaches with engagement
activities planned for next session based on key data
and intelligence.
Page 44

Page 45

Moray Council | Fair | Ambitious | Improving | Responsive  19
Learning, Teaching and Assessment 
During session 2021/2022, schools continued to operate under
enhanced restrictions which had an impact on the pedagogical
approaches adopted in schools and by practitioners.  This included
opportunities for collaborative learning, cross-stage working and
movement within classrooms.  Due to Covid-19 mitigations in
place, wider learning experience continued to be curtailed. 
However, schools and ELC settings embraced opportunities to use
the outdoors as a learning environment and active learning
experience, engaging children in a variety of literacy, numeracy,
health and wellbeing and wider inter-disciplinary learning
activities.  As mitigations reduced, a return to working with valued
partners including Active Schools, Outfit Moray and wider
organisations enriched learning and broadened experiences. 
Removal of restrictions regarding pupil movement witnessed
return of peer support and more collaborative learning
opportunities. 
All schools supported by the Northern Alliance, had access to the World
Education Summit and a range of Professional Learning materials and
resources to support development of practice.  This is in addition to existing
Moray support materials, learning modules and resources, supported by “Our
Moray Standard for Learning and Teaching”.  This has enabled – alongside
removal of Covid-19 mitigations as the year progressed – reflection on practice
and provided opportunities for staff to think creatively around learning and
teaching.  Staff have continued to develop their digital skills and plan
meaningful learning activities including supporting those children who were
self-isolating.  Sixteen schools have also registered for the Digital Schools
Award with more keen to embrace this.   
Working with the National Improvement Framework Officer, a rejuvenated
strategy and plan for Moderation in the Broad General Education has been
developed with introductory planning sessions held.  Quality Assurance and
Moderation Support Officers (QAMSOs) have been recruited across Moray, with 65 QAMSOs commencing key
National training in August 2022.  Focus on target ACEL areas identified above – Literacy (Writing) and Numeracy
– will form the basis for Associated Schools Group and individual school level moderation activities throughout
next session facilitated by QAMSOs and central officers.  This will lead to improved confidence and understanding
of National standards, developing leadership across practitioners at all levels and improving rigour of ACEL data
judgments.  Following roll-out of revised tracking and monitoring approaches through Seemis Progress +
Achievement across our secondary schools and with pilot complete with two of our Moray Primary Schools, full
roll-out of Seemis Progress + Achievement is now planned for session 2022/2023 following positive feedback and
increased rigour in tracking and monitoring of children and young people’s progress across the Broad General
Education. 
Work continued with SQA Coordinators throughout the session with uncertainty over Covid-19 potential impact
on SQA examinations in May 2022.   Following emerging SQA messages and guidance throughout the session,
LEAPs were undertaken as noted above and this critical support network continued.  This included key
information sharing and collaboration using the Moray SQA Coordinator Microsoft Team.  Continued
development of resources to support data literacy and analysis including sharing of key data sets in relation to
BGE and Senior Phase attainment/qualifications and working with valued partners including Skills Development
Scotland (SDS), we continue to maintain focus on improving outcomes for all children and young people. 
Page 45

Page 46

Moray Council | Fair | Ambitious | Improving | Responsive  20
Supporting all Learners 
Following an extensive consultation process with a focus on the
responsibility of all across the service to support and meet the needs of all
learners, a ‘Supporting All Learners’ Strategy has been developed with
three key focus areas: 
• Nurturing Authority, School and Classroom
• Workforce Development
• Health and Wellbeing systems and processes 
A six-year plan has been developed which aligns to the Additional Support
Needs (ASN) strategy to meet the needs of all learners (pupils, staff and
wider stakeholders).  This strategy is concerned with transformational
change in the purpose, nature and delivery of support for all learners that
develops a culture of inclusion, equity and diversity leading to improved
outcomes for all.  It further recognises the deep impact of trauma, the central importance of nurture for
wellbeing and the truth that getting it right for every child will enable them to become successful learners,
confident individuals, responsible citizens and effective contributors.  Underpinned by the United Nations
Convention on the Rights of the Child (UNCRC), The Morgan Review (ASN Review), and The Promise it is
acknowledged that roll-out of this framework will require a planned six-year strategic approach to embed fully
the desired improved outcomes for children, young people and families.  We further continue to empower our
system to consider children’s rights across all aspects of educational delivery through the UNICEF Rights
Respecting School Award (RRSA). 
Wellbeing continues to be a focus of our schools, with return to pre-
established systems and processes to ensure the needs of all children
and young people are met.  Schools continued to embrace approaches
adopted during Covid-19 lockdowns and have increased engagement
and focus on tracking wellbeing.  This includes good practice identified
through discussion with Education Scotland and the National
Improvement Hub with an increasing number of schools adopting the
Glasgow Wellbeing and Motivation Profile.  Using Pupil Equity Funding
(PEF) and additional Covid-19 monies a number of interventions to
support pupils have occurred over the course of the session including
soft-starts, Breakfast Clubs, alternative/flexible timetables, Nurture
Groups, targeted Intervention Groups (including focused
Literacy/Numeracy recovery sessions), wellbeing interventions including
yoga/mindfulness and additional targeted in-class support for learning. 
An increased level of need is noted with a growth in Child Planning and Multi-agency meetings.  In Senior Phase,
SQA Coordinators report an increase in the level of Additional Assessment Arrangements (AAA) to support pupils
with anxiety and other identified learning needs.  Throughout the session, schools continued to offer children,
young people and their families where required enhanced support in absence of wider services, limited in their
contact due to Covid-19 mitigations or partner agency service decisions to prioritise based on revised threshold. 
This put a significant pressure on school staff, particularly Senior Leaders.  Counselling services continue to be
well used, further extended with Action for Children’s ‘Sonas’ service for counselling and mental health support
for children and young people living in Moray.  This is in addition to the valued service provided by ‘The
Exchange’.  As a result, more children and their families are being supported, improving inclusion and
engagement. 
The Additional Support Needs (ASN) Review is underway focusing on five key workstreams:  Forres Pilot, Policy
and Process, Workforce Development, Enhanced Provision and Alternative Provision.  The Council is supporting
this process with £1.96 million investment which included additional staff who will take up appointment and
provide additional capacity from August 2022 onwards. 
Page 46

Page 47

Moray Council | Fair | Ambitious | Improving | Responsive  21
Leadership 
With the roll-out of 1140 hours across Early Learning and Childcare, the
Nursery Manager role is now well-established with clear remits, vision and
operating procedures in place.  This is providing a welcomed career
progression pathway for those with an interest in this field of work.  We
continue to promote careers in Early Learning and particularly, consider
gender balance and representation. 
Following launch of the revised GTCS Standards, an information session was
held with Head Teachers to support understanding and orientation.  This
linked with revised Professional Review and Development guidance and
toolkits endorsed by GTCS and our Local Negotiating Committee for
Teachers (LNCT), supporting the system to undertake reflective practice
and identify further professional development needs. 
Moray welcomed a high number of additional Newly Qualified Teachers (NQTs) and this allowed an opportunity
to review the current NQT professional development programme and extend opportunities for mentoring within
schools.  Valued input and support from Education Scotland colleagues and wider partners enriched this further. 
An increased number of school leaders embraced the opportunity to undertake additional programmes.  For
example, Into Headship, In Headship, Excellence in Headship and our Moray Leadership and Management
Programme.  This is to be commended at a time of major disruption within the service, demonstrating
commitment to improving leadership capacity across our system.  Towards the end of the session, a number of
colleagues were nominated for Education Scotland HMI Associated Assessor and we await the outcome of
Education Scotland’s recruitment process.  Any appointments made will complement the existing Associate
Assessors within Moray and add value to the Quality Assurance team, strengthening our ‘looking outwards’ for
‘improving inwards’.  The Professional Learning and Leadership (PLL) Strategy continues to be developed and is
currently in draft form.  This will be a priority in the forthcoming session to ensure our Moray system has the
strategy, guidance and toolkits in order to support their professional development at all stages in their career
journey. 
Quality Improvement Officers continue to lead improvement work across the priority areas of our Moray
Education Strategic Plan 2020-2023.  This has resulted in development of key priority and policy areas as outlined
within this Self-evaluation document including revised approaches to Curriculum, Moderation, Supporting all
Learners and Professional Learning.  Changes in the central Education team over the course of the year along with
an existing vacancy has stalled progress in key areas.  Building team and capacity will be a priority for the
forthcoming session as we continue to navigate educational change.  Strategic meetings across Moray Education
continued despite disruption as noted further above, with revised approaches positively welcomed and a new
schedule planned for the coming session.   
The introduction of the Head Teacher Consultative Group will guide and inform key strategy and policy over the
coming session and ensure system-wide leadership.  With relaxation of mitigations there will be an opportunity to
resume in-person engagement including meetings and working groups to support empowerment.  We continue
to progress recruitment processes for Senior Leadership posts, with opportunities for school leaders to contribute
and look outwards from current context.  Middle leaders in Secondary Schools continue to be supported through
Secondary School Subject Network groups, with opportunity to lead across Moray which has been embraced by
many.  The resumption of the Moray Council Leadership Forum has supported further opportunities for central
officers and representative school leaders to gain insight into Council-wide policy and developments including
Political/political Insight. 
Logie Primary School
Page 47

Page 48

Moray Council | Fair | Ambitious | Improving | Responsive  22
Self-evaluation for self-improvement 
Throughout the session, we continue to engage in key self-evaluation for self-improvement activities.  This
includes Education Scotland Recovery Visits where a few schools and Nursery settings volunteered to participate.
This provided feedback to validate their current position and Covid-19 impact.  Further Education Scotland
scrutiny visits were undertaken which allowed schools subject to ongoing engagement with Education Scotland to
achieve sign-off and return to normal school improvement processes.   
Throughout the pandemic, we have continued to support and progress statutory processes and requested key
documentation in line with the Standards in Scotland’s Schools Act.  Schools continued to self-evaluate and gather
a range of relevant data, evidence and views to inform School Improvement Plans for the coming session.   
Self-evaluation for self-improvement continues to be encouraged at all levels in our system with practitioners
reviewing own classroom practice, middle leaders providing support and challenge to departments on
improvement activities for raising attainment, all third tier officers for leading school or service improvement and
an emphasis on strategic plan priorities.  With relaxation in Covid-19 mitigations, a phased and measured return
to observation activities which may take different forms – learning rounds, learning walkthroughs, peer visits and
other supportive activities – will take place in order to support practitioners in strengthening their pedagogical
practice. 
As part of the induction programme for our new elected members, we reviewed all key self-evaluation and
planning documentation linked to our Strategic Plan and reflected further on our Moray Council values as we
enter a new Council Administration period.  Our key observations are noted in the Infographic below and have
been shared widely across the Council and service: 
In order to further support our locally elected members in understanding the complex and interconnected nature
of Education locally and nationally, an ‘Elected Member Guide’ was produced and will continue to be developed
and supported through a wide range of interactions and workshops.  We will continue to contribute to Moray
Council and wider Education priorities as appropriate (for example, Learning Estate, Transformation etc).
Page 48

Page 49

Moray Council | Fair | Ambitious | Improving | Responsive  23
Celebrating Success 
We continue to celebrate a range of successes in the backdrop of what has been the most challenging period in
Scottish Education.  Throughout this Self-evaluation document, a snapshot of the wealth of engaging learning
activities and achievements of success have been captured in picture format.  This is a very small representation
of the vast amount of creativity and innovation ever-present in our schools and ELC settings to ensure that
children have a safe, welcoming learning environment where they are cared for, nurtured and learn on a daily
basis.  Our schools celebrate success through a variety of mechanisms including school newsletters, websites,
social media, online platforms and as mitigations have allowed, return to in-person events and celebrations. 
The greatest source of evidence of success of the Moray Education system lies within each individual child and
young person and the growth in their skills, knowledge, personal attributes and ambitions.  Many schools achieve
awards and different forms of accreditation (for example, Rights Respecting Schools).  However, for others the
true success is evident through the ethos and life of the school and these principles being embedded in practice.   
We thank our staff, wider council services, parents/carers, partners and most of all our children and young people
for the part that they play in improving outcomes for all.
For further examples in terms of celebrating success, please see @EducationMoray on Twitter. 
Newmill Primary School
Climbing the Tower of Learning together
Celebrating Success – Moray Young Citizen Awards
Page 49

Page 50

Moray Council | Fair | Ambitious | Improving | Responsive  24
Executive Summary – NIF Plan 2022/2023 
Improving Outcomes for all
• Finalise Stretch Aims following interrogation and review of key attainment measures from SQA, SCQF and
BGE ACEL, initiating revised support and scrutiny framework
• Implement iMpact Moray Strategy across our system in collaboration with Education Scotland, Insight, SQA
and SCQF improving outcomes for all
• Further enhance approaches to data tracking, monitoring, interrogation and literacy across our system
• Through data intelligence, targeted focus on supporting the teaching of Literacy (Writing) and Numeracy in
the BGE
• Through data intelligence, task Secondary School Subject Groups with key improvement actions in order to
add value to curriculum offer, uptake and attainment
• Extend and seek opportunities to continue and enhance partnership working to implement key legislative
requirements
• Rejuvenate system-wide buy-in and contribution to improvement at all levels
Curriculum Learning, Teaching and Assessment
• Fully implement and embed the Moray Play
Strategy and curriculum progressions
• Support the roll-out and implementation of Moray
Curricular Progressions, ensuring cohesion with
ELC and Senior Phase 
• Showcase and support development of Inter-
disciplinary Learning (IDL) aligned with each
school’s unique context and Curriculum Rationale
• Review the Moray approach to Skills Progression
• Development of Literacy and Numeracy strategies
• Continue to consider with secondary school
leaders and wider partners, curriculum and
accreditation opportunities
• Continue to review and update training materials
and resources to support ‘Our Moray Standard for
Learning and Teaching’
• To promote and support the use of observation
toolkits and extend towards Professional Learning
Communities and Practitioner Enquiry approaches
• Initiate small-scale Professional Enquiry for wider
system participation
• Support BGE Moderation and QAMSO network
activities through the BGE Moderation Strategy
• Continue to develop play pedagogy approaches
across ELC and Primary
• Roll-out and support the revised Parental
Involvement and Engagement Strategy
Supporting all Learners Leadership
• Roll-out and implementation of the Supporting All
Learners Strategy with development of rubric to
support 6-year plan
• Continue to undertake the Additional Support
Needs Review within key workstream areas
• Develop a cohesive single/multi-agency plan for
full implementation of the UNCRC and ‘The
Promise’ 
• Strengthen Curricular HWB offer across Moray
• Review alternative and part-time timetable
provision across Moray to maximise school
attendance, participation and attainment and
partner involvement
• Complete and roll-out the reviewed Professional
Learning and Leadership (PLL) Strategy
• Develop and share toolkits to support practitioner
engagement at all levels with the PLL Strategy
• Review and further develop all Moray professional
learning programmes (NQT, Middle Leadership,
Aspiring and Senior Leadership)
• Complete and initiate newly appointed Senior
Leader Induction Programme and resources
• Support/extend external professional
development programmes and partnerships
• Support empowerment and system leadership
through guidance, signposting and facilitation
Self-evaluation for self-improvement
• Increase and improve system-wide accountability and responsibility for improvement across the Education
service
• Review approaches to self-evaluation for self-improvement across our system including updating guidance
in line with statutory scrutiny and requirements 
Page 50

Page 51

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 24 AUGUST 2022 
SUBJECT: SCOTTISH ATTAINMENT CHALLENGE 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To provide Committee with an update on the refreshed Scottish Attainment
Challenge (SAC) which is supported by funding through the Attainment
Scotland Fund, the aims of which are to address the challenges of the
poverty-related attainment gap.  The report also provides information
regarding planned spend for the coming session. 
1.2 This report is submitted to Committee in terms of Section III (D) (1) of the
Council's Scheme of Administration relating to all the functions of the Council
as an Education Authority. 
2. RECOMMENDATION 
2.1 It is recommended that Committee: 
i) consider and note the update on 2022 Scottish Government Pupil
Equity Funding (PEF), and planned expenditure, based on the
Education service self-evaluation gathered across the year,  for
Strategic Equity Funding (SEF) and Care Experienced Young People
Funding (CEYPF), working with Social Work colleagues; 
ii) note the strategic guidance at Scottish Government and local
Authority levels to support the implementation of the funding; 
iii) note the forthcoming requirement to set stretch aims linked to key
baseline data (including attainment) as required by the Scottish
Attainment Challenge; 
iv) note the planned use of SEF for session 2022/23; 
v) note the early plans for CEYPF; and 
Item 7.*
Page 51

Page 52

vi) instruct officers to provide further updates in line with Scottish
Government reporting requirements to be presented at future
Committee meetings. 
3. BACKGROUND 
3.1 The Attainment Scotland Fund is made up of a number of funding streams
totalling £1 billion.  This targeted funding includes the SEF, PEF and CEYPF
which Moray receives and is the focus of this paper. 
3.2 This paper will include an overview of the 2022-23 PEF funding allocations for
Moray Schools eligible to receive PEF funding (Appendix 1). 
3.3 The refreshed SAC, launched in March 2022 does not introduce a new policy 
but rather builds on the existing policy that has been in place since 2015.  The 
main aim of the policy is to provide a framework to support recovery from the 
COVID-19 pandemic and accelerate progress in closing the poverty related 
attainment gap. 
3.4 The policy’s aim is to ‘use education to improve outcomes for children and 
young people impacted by poverty, with a focus on tackling the poverty 
related attainment gap’.  It is well known that education cannot do this alone 
with the adage of ‘it takes a village to raise a child’.  Therefore schools and 
central officers plan use of the funding which includes working with partners 
and key stakeholders in order to support children and families. 
3.5 A new requirement by the Scottish Government as part of SAC is that all local 
authorities set out ‘stretch aims’ as detailed in the guidance Framework for 
Recovery and Accelerating Progress.  This includes 5 ‘core’ aims and 
additional ‘plus’ aims.  This paper will detail the process the Education service 
has taken in developing these stretch aims and the current draft stretch aims 
for Moray.  Stretch aims have to be agreed by September each year working 
closely with the Senior Regional Advisor for the Northern Education Scotland 
Team, our Attainment Advisor and the National Improvement Framework 
Officer. 
3.6 This paper provides Committee with updated information on the continued
intention of the Scottish Government, as part of the Scottish Attainment
Challenge, to disperse £1.48m in PEF, £170k in SEF funding and £158k in
CEYPF for Moray for the 2022-23 session.  In addition, national funding for
Community Learning and Development has been announced but as yet there
is no indication of the local breakdown - this funding will be overseen by
Education Resources and Communities. 
4. PROGRESS TO DATE 
4.1 The first five years of the SAC saw progress in closing the poverty-related
attainment gap across Scotland. With the disruption to learning as a result of
the Covid-19 pandemic we have seen an impact on attainment of children,
with those affected by poverty impacted at disproportionately higher levels. 
Page 52

Page 53

4.2 The Framework for Recovery and Accelerating Progress (the Framework) 
aims to: 
• Mitigate the impact of poverty on children’s outcomes by tackling the
poverty-related attainment gap;
• Set high expectations through annual, locally identified stretch aims to
ensure progress in recovering from the impact of the Covid-19
pandemic;
• Build on the investment in the Scottish Attainment Challenge to make a
greater difference, more quickly for children and young people; 
• Build consistency on processes used across the country to build a
more accurate national picture;
• Drive improved outcomes for children and young people impacted by
poverty;
• Ensure elements of local planning and decision making while driving
strategic direction. 
4.3 The aim of the framework is to contribute to improved outcomes for children 
and young people recognising the importance of attainment, achievement and 
health and wellbeing.  The ‘core plus’ model of stretch aims reflects this. 
4.4 All local authorities are expected to set stretch aims for the following five
measures and report on these annually to Scottish Government.  Officers
await further guidance from the Scottish Government in order to finalise the
Stretch aims which have to be submitted to Education Scotland by the end of
September.  In addition further work needs to take place between the
Education Service and Education Scotland after the Scottish Government
Insight Benchmarking Tool update in September.  Furthermore, local quality
assurance of Achievement of curriculum for Excellence levels is underway
and will also support the finalisation of the stretch aims.  These will be
reported to Committee at a future date and are subject to review as this is the
first year of introduction.  Based on current guidance these will focus on: 
• Achievement of Curriculum for Excellence Levels (literacy combined
and numeracy combined);
• The proportion of school leavers attaining one or more pass at Scottish
Credit and Qualifications Framework (SCQF) level 5 based on the
“summary statistics for attainment and initial leaver destinations”
publication
• The proportion of school leavers attaining one or more pass at SCQF
level 6 based on the “summary statistics for attainment and initial
leaver destinations” publication
• The proportion of 16-19 year olds participating in education,
employment or training based on the Annual Participation Measure
produced by Skills Development Scotland (SDS); and
• A locally identified aim for health and wellbeing, to be measured using
local datasets 
4.5 In setting the Moray ‘core’ stretch aims collaborative work has been
undertaken with Education Scotland colleagues.  This included examining
trends, considering targets within the Moray Raising Attainment Strategy and
reviewing the impact of the pandemic on learners locally.  Working with school
Page 53

Page 54

leaders in secondary schools and partners, an Insight Strategy has been
devised to improve data literacy as well as a key improvement focus on
improving opportunities for accreditation across the senior phase. 
4.6 This work along with further planned development of our senior phase
curriculum strategy offer working with the Education Scotland Curriculum
Innovation Team, SQA and SCQF partnership will have a focus on  curriculum
redesign, accreditation, consortia arrangements, virtual delivery,  moderation,
tracking and monitoring across both the Broad General Education and Senior
phase providing a clear local strategic framework for improvement.  This will
also be reported to Committee at a future date. 
4.7 Whilst considering the Moray draft stretch aims, a number of weighting factors 
were identified which have either a positive or negative impact on pupil’s 
achievements which include 
Positive contributors Risks to be mitigated against
Curriculum change/models Pandemic disruption and effects
Local strategies, associated plans
and leadership opportunities
Increase in Additional Support
Needs, Mental health and wellbeing
needs and behavioural needs
Consortia and college options Alternative certification model
impact
Interventions/additional funding Budget pressures and cessation of
Covid additional posts 
4.8 As the SAC is related to the Poverty related attainment gap, Scottish Index of
Multiple Deprivation (SIMD) data was used where the Scottish Government
take the 10 indicators and round to 5 quintiles where quintile 1 (SIMD1/2)
hosts children in the most deprived areas of Moray to quintile 5 (SIMD9/10)
which hosts children in the least deprived areas of Moray.  The majority of
Moray’s children are in quintiles 3 and 4 however there is an increasing
number in quintile 1 and a proportion in quintile 2.  Due to the number in
quintile 2, draft stretch aims have been set to look at quintiles 1 and 2 in
comparison with attainment levels at quintile 5.   
4.9 On examining performance data trends across the Broad General Education, 
key gaps appear in writing at quintile 2 in P1, P4 and P1/4/7 combined.  In 
additional there are gaps in quintile 2 for numeracy in P1, 4, 7 and P1/4/7 
combined.   
4.10 Additional ‘plus’ aims are included in this model with local authorities charged
with choosing an aim specific to their own context and datasets.  Work is
ongoing to ascertain this through our data intelligence. 
4.11 Schools eligible, continue to benefit from PEF funding as committed by the
Scottish Government for the remainder of the parliamentary term.  School
level allocations are shown in Appendix 1.  All schools in Moray are eligible
except one, Dallas Primary. 
4.12 PEF funding is allocated directly to schools to be used to provide targeted
support and interventions to children, and families if appropriate, affected by
Page 54

Page 55

poverty.  School leaders plan for this funding in tandem with existing School
Improvement Planning processes with a separate template, where funding is
significant to show outcomes and measures.  National operating guidance is
provided for PEF funding and in addition local Moray guidance is updated
annually working collaboratively with the Attainment Advisor.  Published
annual school Standards and Quality Reports evidence the impact of the use
of PEF within the school to meet the needs of targeted groups. 
4.13 The initial tranche of SAC monies included Challenge Authorities and Schools
and a Universal programme with Moray in the latter.  This has been replaced
by Strategic Equity Funding and sees all 32 local authorities receiving a
proportion of SEF funding.  Moray previously had no children in SIMD1
however Elgin South is now classified as having areas in this decile.  Moray
received £170,500 through SEF funding for session 2022-23.  This will grow
year on year as follows: 
Moray SEF allocations 2022/23 – 2025/26 
4.14 Planning for the spend of SEF funding for the first year’s allocation includes a
pilot project in Elgin High School to build on the work started with Covid
recovery posts, now deleted, to target a number of young people on part-time
timetables with an alternative curricula to improve accreditation routes  and a
transition project in the Buckie High School Associated Schools group.  Both
projects will be evaluated and reported on with a view to disseminating
progress and impact for consideration in future years.  As Dallas Primary has
not been allocated PEF, SEF funding will be used to provide the minimum
allocation to the school which is in line with good practice in other Local
Authorities and taking in to consideration current cost of living and challenges
facing families 
4.14 In addition to PEF and SEF, we also receive CECYPF which we jointly plan
for with colleagues from Children’s Social Work.  Funding is provided annually
and for this session, at a figure of £1,200 per looked after child aged 5-15 as
outlined in the Children’s Social Work Statistics Scotland 2020-21.  Funding is
provided to local authorities in order to improve educational outcomes for
CECYP supported by the strategic goals of the Promise and Scottish
Attainment Challenge.  All CECYP aged from 0-26 are eligible for support and
Local Authorities as Corporate Parents should determine the best ways that
funding can improve attainment of their CECYP.   
4.15 In Moray the plan is to continue work so far in mentoring CEYP as they
prepare to leave school and enter a positive sustained post school
destination. Part of the funding will support the Mentoring Young Talent
initiative which has proved successful.  The remainder of the funding will be
used to employ a virtual Head Teacher who will oversee CECYP working
closely with Social Work partners.  This new post has been successful in
other Authorities and will bring value to our CECYP and their families as well
Local Authorities 2022/23 2023/24 2024/25 2025/26
Moray £170,500 £338,950 £507,400 £675,851
Page 55

Page 56

as closely monitoring and supporting projects to raise their attainment and
wellbeing. 
4.16 Progress with funding will be evidenced via our annual National Improvement
Framework return which is reported to Committee annually and also
supported by our Education Scotland Attainment Advisor.  
5. NEXT STEPS 
5.1 A consultation will be undertaken with the head teacher consultative group
regarding our local approaches to setting the stretch aims. We await the
national Guidance to support these conversations and further engagement
with Education Scotland.  Further consultation with the system including
professional associations will also take place.  A head teacher briefing will
give further opportunity for comment prior to final discussions with Education
Scotland prior to stretch aims being submitted in September as per statutory
requirement. 
5.2 Reporting requirements are clear and will be quarterly with further reports
back to this Committee on progress and impact.  Stretch Aims will form a key
basis of our scrutiny and support work with our schools moving forwards, with
planned revision to our Performance Management framework underway. 
6. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
This report was informed by the priorities within the Corporate Plan and
10 Year Plan and in particular to Our People, Building a better future for
our children and young people in Moray. 
(b) Policy and Legal
Attainment Scotland Funding through the Scottish Attainment Challenge
supports the central purpose of the Scottish Government to accelerate
recovery and progress in the delivery of national outcomes.  The Council
requires to meet their statutory duties in terms of the Standards in
Scotland’s Schools etc, Act 2000. 
(c) Financial Implications
Pupil Equity funding is allocated across the financial year however can
be spent across the school session. Head Teachers hold plans for PEF
as part of their school improvement planning. Strategic Equity and other
funding is allocated on a similar basis with Moray’s allocation noted
above.  As previously stated this will fund two projects with impact
reports coming back to Committee There are current underspends in
PEF and CECYP which are under review and planned expenditure has
been identified. 
(d) Risk Implications
Officer capacity to plan for SEF and CEYPF will mean a delay in projects
starting and posts being filled in the first year of funding.  Recruitment
may not be successful in the first round leading to delays in work
Page 56

Page 57

commencing, progress made and impact being evident.  Lack of
progression in recruiting additional Research and Information Officer to
support Education’s plan to explore Power BI to improve data access,
and reporting has the potential risk that officers may not have capacity to
analyse data required for quarterly reporting requirements.  Potential risk
that even with the planned work, the Council does not close the poverty
related attainment gap due to multiple factors including, interventions
may not work and a review and replan to take place, difficulty in
recruitment, training required for new staff etc.  In addition, some short
term interventions will not realise sustainability or improvement for a
number of years. 
(e) Staffing Implications
Potential implications due to the time limited nature of the funding and
inability to offer staff permanent posts as a result.   
(f) Property
There are no property issues arising from this report. 
(g) Equalities/Socio Economic Impact
The Scottish Attainment Challenge is aimed at reducing inequalities and
SEF funding targets key protected characteristic groups. 
(h) Climate Change and Biodiversity Impacts
None 
(i) Consultations
The Head of Education Resources and Communities, the Head of
Financial Services, Head of HR, ICT and OD, Quality Improvement
Manager, the Business Support Team Manager, and Tracey Sutherland,
Committee Services Officer, have been consulted on this report and
agree with the sections of the report relating to their areas of
responsibility. 
7. CONCLUSION 
7.1 The refreshed Scottish Attainment Challenge and associated funding
streams focuses on and accelerates targeted improvement activity to
reduce the poverty related attainment gap.  Through planned and
targeted interventions and approaches in line with the Scottish
Government Scottish Attainment Challenge guidance for PEF, CECYP
and SEF as outlined in the Framework for Recovery and Accelerating
Progress, ongoing monitoring will be undertaken against Stretch Aims
agreed with Education Scotland.  Supported by our Education Scotland
Attainment Advisor, this will determine impact and direction of
interventions and future funding.   
Author of Report: Vivienne Cross, Head of Education
Background Papers: Framework for Recovery and Accelerating Progress.  
Page 57

Page 58

Ref: 
Page 58

Page 59

Appendix 1
School Name Stage   Allocation 
Linkwood Primary Primary  £        73,500 
Alves Primary School Primary  £        11,025 
Bishopmill Primary School Primary  £        29,160 
Burghead Primary School Primary  £        25,920 
Dallas Primary School Primary  £               -   
Dyke Primary School Primary  £        14,700 
East End Primary School Primary  £        37,800 
Seafield Primary School Primary  £        58,800 
St Sylvester's RC Primary Schl Primary  £        15,925 
West End Primary School Primary  £          9,800 
Anderson's Primary School Primary  £        31,850 
Applegrove Primary School Primary  £        68,600 
Hopeman Primary School Primary  £          7,560 
Kinloss Primary School Primary  £        11,025 
Knockando Primary School Primary  £          4,900 
Lhanbryde Primary School Primary  £        29,400 
Logie Primary School Primary  £          6,125 
Hythehill Primary School Primary  £        46,550 
St Gerardine Primary School Primary  £        38,880 
Mosstodloch Primary School Primary  £        19,440 
Mosstowie Primary School Primary  £          2,160 
New Elgin Primary School Primary  £        95,040 
Rothes Primary School Primary  £        11,025 
Milne's Primary School Primary  £        18,375 
Botriphnie Primary School Primary  £          3,675 
Cluny Primary School Primary  £        44,100 
Millbank Primary School Primary  £        61,250 
St Peter's RC Primary School Primary  £        40,425 
Craigellachie Primary School Primary  £          3,675 
Crossroads Primary School Primary  £          2,160 
Cullen Primary School Primary  £          9,800 
Findochty Primary School Primary  £          9,720 
Glenlivet Primary School Primary  £          2,160 
Keith Primary School Primary  £        57,575 
St Thomas' RC Primary School Primary  £        18,375 
Mortlach Primary School Primary  £        20,825 
Newmill Primary School Primary  £          7,350 
Portessie Primary School Primary  £          7,350 
Portgordon Primary School Primary  £          6,480 
Portknockie Primary School Primary  £        18,360 
Rothiemay Primary School Primary  £          6,125 
Tomintoul Primary School Primary  £          4,900 
Aberlour Primary School Primary  £          7,350 
Greenwards Primary School Primary  £        45,325 
Pilmuir Primary School Primary  £        37,975 
Elgin Academy Secondary  £        61,250 
Milne's High School Secondary  £        19,440 
Forres Academy Secondary  £        78,400 
Lossiemouth High School Secondary  £        39,200 
Buckie High School Secondary  £        78,400 
Keith Grammar School Secondary  £        35,525 
Speyside High School Secondary  £        17,280 
Elgin High School Secondary  £        72,275 
Total £     1,484,285     
Item 7.*
Page 59

Page 60

Page 60

Page 61

REPORT TO:   EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 24 AUGUST 2022 
SUBJECT: EDUCATION REVENUE BUDGET MONITORING TO 30 JUNE
2022 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the budget position for Education as at 30 June
2022. 
1.2 This report is submitted to Committee in terms of Section III (A) (2) of the
Council’s Scheme of Administration relating to the consideration of capital and
revenue budgets and long term financial plans. 
2.  RECOMMENDATION 
2.1 It is recommended that Committee considers and notes the budget
position at 30 June 2022. 
3. BACKGROUND 
3.1 The report highlights those areas of the budget where there is a significant
percentage variance identified at 30 June 2022. 
4. BUDGET POSITION 
4.1 The spend at 30 June 2022 is £19,842,000 against a budget to date of
£20,251,000, giving an underspend of £409,000 as shown in Appendix 1. 
4.2 The main variance in Early Learning and Childcare is an underspend on the
snack and fundraising accounts. 
4.3 The main variance in primary and secondary schools relates to devolved
school budgets comprising of £90,000 in primary schools which is 1.3% of the
budget to date and £234,000 in secondary schools which is 3.1% of the
budget to date. Any differential between the variances reported here and in
the appendix link to the fact that school budgets have a devolved and non-
devolved component and the differential are non-devolved variances.  An
example to explain the variance in a secondary school is that a member of
staff may move post at the end of May and be replaced by an Newly Qualified
Teacher in August so no salary paid from June. 
Item 8.*
Page 61

Page 62

4.4 Education Central Services has an underspend of £7,000 on period poverty,
£7,000 on relocation costs and £13,000 on facilitating school improvement as
the main variances, with other minor underspends. Period poverty underspend
has been acknowledged and addressed. 
4.5 Officers are satisfied that the variances are acceptable. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement 
Plan (LOIP)
The Education Revenue Budget has particular reference to National
Outcome 8 – we have improved the life  chances for children, young
people and families at risk. 
(b)  Policy and Legal
The Council has statutory responsibilities to meet educational
needs, the needs of children and young people in need and those it
looks after. 
(c)  Financial implications
The resource implications are set out in this report and at Appendix 1. 
The underspend as at 30 June 2022 is £409,000 against a budget to
date of £20,251,000. 
(d)  Risk implications
Budget Managers are aware of their responsibilities for managing
budget allocations and approval for any variances will be sought from
Committee in line with the Financial Regulations. 
(e)  Staffing implications
There are no staffing implications associated with this report. 
(f)  Property
There are no property implications associated with this report. 
(g)  Equalities/Socio Economic Impact
An Equality Impact Assessment is not needed because the report is to
inform the Committee on budget monitoring. 
(h)  Climate Change and Biodiversity Impacts
No climate change and biodiversity impacts arise directly from this report. 
(i) Consultations
Paul Connor, Principal Accountant and Tracey Sutherland, Committee
Services Officer, have been consulted and are in agreement with the
contents of this report where it relates to their areas of responsibility.  
Page 62

Page 63

6. CONCLUSION 
6.1 That Committee considers and notes the budget position as at 30 June
2022. 
Author of Report: Vivienne Cross, Head of Education 
Nicky Gosling, Accountant 
Background Papers: with authors 
Ref:  SPMAN-1315769894-307 / SPMAN-1315769894-305 
Page 63

Page 64

Page 64

Page 65

Educational Services Appendix 1
Budget Monitoring Report to 30 June 2022
Service
Revised
Budget 
Budget to
Date 
Actual to
Date 
Variance to
Date  Variance
£'000  £'000  £'000  £'000 %
Early Learning and Childcare 4,488 2,957 2,910 47 2 %
Primary Education 28,182 6,923 6,857 66 1 %
Secondary Education 31,808 7,663 7,405 258 3 %
Education Central Services 4,742 1,652 1,616 36 2 %
Management 118 29 27 2 7 %
Efficiency Savings-Education (333) - - - -
Education COVID 19 1,051 1,027 1,027 - -
-
Educational Services Total 70,056 20,251 19,842 409 -
Item 8.*
Page 65

Page 66

Page 66

Page 67

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE 24 AUGUST 2022 
SUBJECT: EDUCATION RESOURCES AND COMMUNITIES AND
EDUCATION CAPITAL BUDGET MONITORING REPORT TO 30
JUNE 2022 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform Committee of the capital budget position for Education Resources
and Communities and Education as at June 2022 
1.2 This report is submitted to Committee in terms of Section III (A) (2) of the
Council's Scheme of Administration relating to the consideration of Capital
and Revenue budgets and long term financial plans. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee scrutinises and notes the capital
budget position at 30 June 2022. 
3. BACKGROUND 
3.1 At the meeting of Moray Council on 22 February 2022 (paragraph 3 of the
minute refers) Council approved the Capital Plan for 2022/23. At the same
meeting the need for the Council to make £20 million savings in 2023/24 and
2024/25 was highlighted. As part of the financial planning process an early
initial review of the capital plan was undertaken with departments to firm up
on timing of projects given current market conditions and departmental
capacity to deliver. Amendments to the capital plan were recommended as a
result of this review and agreed at the meeting on Moray Council on 29 June
(paragraph 17 of the minute refers). 
3.2  This report highlights those areas of the capital budget relating to Education
Resources and Communities and Education budgets where there is a
significant percentage variance as at 30 June 2022, or the risk of a variance
over the course of the financial year (highlighted as red or amber in the
budget update at APPENDIX 1). 
3.3  The report also provides a narrative update on major ongoing projects.
Item 9.*
Page 67

Page 68

3.4  The capital budgets for the Education Resources and Communities and
Education Services are listed in APPENDIX 1. 
4. BUDGET POSITION 
4.1     The total approved capital budget for Education Resources and Communities
and Education for financial year 2022/23 is: 
22/23
£000
Land & Buildings 6,630
Vehicles Plant &
Equipment
460
Total 7,090 
4.2       Actual expenditure to end June 2022 is £674,000 
4.3  Current variance (or risk of variance) in the Capital Plan relate to the 
following: 
• £700,000 is provided for the development of a new 3G pitch in
Forres. The Council is continuing to collaborate with the Forres
Community Football Trust regarding the development of a new pitch
and associated facilities. A decision is required regarding the
location of a new pitch. This decision has been delayed due to the
dependency on discussions regarding the future of Forres
Academy. The Trust has elected to wait until these discussions
have progressed. 
• 2022/23 spend on the Findrassie project relates to Design Team
costs. The Project Team are awaiting detailed costs from the
Design Team to determine actual variances. There was an
underspend in 2021/22 against this project of £188,000. A carry
forward of £50,000 was agreed at the Council meeting on 29 June
2022 to meet the expected cost of design works. A further carry
forward may be requested once detailed costs are known. 
• £300,000 is provided for the refurbishment and upgrade of pools.
Condition surveys of our leisure estate have been ongoing during
the first quarter of 2022/23 and we are awaiting the outcome of
these surveys prior to instructing any works on our pools. 
• £400,000 is provided for plant and equipment at Moray Leisure
Centre. Moray Leisure Centre are currently identifying the
immediate asset repair or replacement requirements following
receipt of their condition surveys and also from information
gathered on recent breakdowns and damage. 
Page 68

Page 69

5. MAJOR PROJECTS UPDATE 
Schools Essential Maintenance Programme 2022/23
5.1 The total budget for this programme of work is £3.208m which is made up of a
carry forward of £0.208m from last year and £3m from 2021/22 Capital Plan.
This programme of work is a single line within the Capital Plan.  However, the
programme has been split into separate budgets for each individual project as
detailed in Appendix I for budget monitoring purposes. The majority of this
work programme is the phased work begun under the Make Do and Mend
criteria, which was to address elements of schools in Condition D that have
the possibility of failing. The scope of each of the projects is developed in
consultation with the school and the contractor. The reactive nature of this
programme does mean that individual project budgets do vary during the year
of the programme. 
5.2 Work to replace defective render with a new insulated render system at
Hythehill Primary School completed on 25 April 2022. 
5.3 Design work to upgrade the mechanical and electrical systems at Speyside
High School, Cluny Primary School, Forres Academy, New Elgin Primary
School, Anderson Primary School, Burghead Primary School, West End
Primary School and Kinloss Primary School were completed during Quarter 1. 
5.4 The quarter 1 projected expenditure at 30 June 2022 for this programme is
£3.169m. The majority of this programme is carried out during the school
summer holidays and at the time of drafting this report is complete. Work has
progressed well on site with no major issues uncovered and very little of the
contingency allowances required. Therefore it is expected that the quarter 2
projected figures will reduce within this budget heading. 
5.5  Emergency works to replace corroded mains water pipework at Forres
Academy were carried out and completed under this programme of work, but
funded from the Repairs and Maintenance budget. 
5.6 A carry forward of £208k from the 2021/22 budget appears in the budget line
under Milnes High School Roof covering replacement. This carry forward was
taken to support design work and as a contingency for the overall programme.
The replacement of the roof covering at Milnes High School is a significant
budget estimate and this type of work would be carried out during a summer
period, therefore it is not projected that this budget line will be fully committed
this financial year. 
New Build Project (Lossiemouth High School)
5.7 COVID-19 costs have been agreed with the contractor and submitted to the
Scottish Government as indicated in previous reports to this Committee. The
Scottish Government in a letter dated 24 June 2022 apologised for the long
delay in replying, however have stated they are not able to support the
Council with additional costs. The project is complete with planned payments
for the completion of landscaping and the release of monies held for retention
in the contract.
Page 69

Page 70

New Build Project (Linkwood Primary School)
5.8 COVID-19 costs have been agreed with the contractor and submitted to the
Scottish Government as indicated in previous Reports to this Committee. The
Scottish Government in a letter dated 24 June 2022 apologised for the long
delay in replying, however have stated they are not able to support the
Council with additional costs. 
New Build Project (Findrassie Primary School)
5.9 Consultations with all stakeholder groups has concluded for this stage of the
project with all relevant feedback included within the design brief.  The internal
design team has developed the design to RIBA stage 2, which provides the
concept design for the building. The design is a two-storey building that works
with the contours of the site to allow outdoor learning to be accessed from
most classrooms. The initial cost model has been developed and is currently
being reviewed. The Planning Application Notification (PAN) was submitted in
June 2022 with an initial meeting held with statutory consultees.  Work is
currently ongoing to engage with a main Tier 1 contractor with a view to
having them appointed by the end of August 2022 to support a Stage 3-4
design.   
Early Learning and Childcare Expansion
5.10 Additional Capital Plan spend on Early Learning and Childcare facilities
(Aberlour, Kinloss, Findochty, Portgordon, Rothes and St Peters) was
approved at Moray Council on 29 June 2022 (para 22 of the minute refers).
Initial project timelines have been set out for these projects, with further
information provided in the Early Learning and Childcare – Major and Minor
Infrastructure Works Update (Information Report). 
6. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The capital projects referred to in this report support the delivery of the
LOIP outcome of building a better future for our children and young
people in Moray and growing a diverse and sustainable economy, and
are advancing the Corporate Plan priority of reviewing and transforming
the learning environment, and creating a sustainable council. 
(b) Policy and Legal
The Council has statutory responsibilities to meet educational needs,
the needs of children and young people in need and those it looks
after. 
(c) Financial implications
The resource implication are set out in this report and at Appendix 1. 
(d) Risk Implications
Budget Managers are aware of their responsibilities for managing budget
allocations and approval for any variances will be sought from
Committee in line with the Financial Regulations. 
Page 70

Page 71

The school estate (excluding new build) continues to deteriorate. The
level of investment that the Council is able to afford is insufficient to
maintain all schools to B/B standard. The risk of building failures,
temporary closures and/or health & safety continue to be a concern. 
Construction costs are continuing to rise, which will impact on tender
prices received for construction projects, which means additional budget
may be required for projects as they progress. 
(e) Staffing Implications
There no staffing implications arising directly from this report. 
(f) Property
There are no property implications other than those detailed in the
report. 
(g) Equalities/Socio Economic Impact
There are no equalities or socio economic implications associated with
this report. 
(h) Climate Change and Biodiversity Impacts
Where heat source replacements are planned a Heating Option
Appraisal in accordance with current procedures will be carried out that
includes renewable heating options. Where wall or roof replacements are
programmed additional insulation to improve the performance of the
fabric will be considered. 
For new build projects we are considering options to meet energy and
zero carbon targets. 
(i) Consultations
Paul Connor, Principal Accountant; the Property Asset Manager; Design
and Construction Manager; Learning Estate Programme Manager; Legal
Services Manager; Equal Opportunities Officer, Head of Education and
Tracey Sutherland, Committee Services Officer have been consulted
and the comments received have been incorporated into the report. 
7. CONCLUSION 
7.1 This report presents the Education Resources and Communities and
Education Capital Works budget to 30 June 2022. It highlights and
provides detail on any variances or projected variances and provides an
update for Members on approved major projects. 
Author of Report: Joanna Shirriffs, Head of Education Resources and
Communities
Background Papers:
Ref: SPMAN-9425411-53 
SPMAN-9425411-54    
Page 71

Page 72

Page 72

Page 73

APPENDIX 1
EDUCATION RESOURCES & COMMUNITIES AND EDUCATION CAPITAL PLAN 
Current
Capital
Plan
2022/23
£000
Actual
Expenditure
to 30 June
2022
£000
Total
Projected
Expenditure 
£000
Projected
Variance 
£000
R/A/G
LAND & BUILDINGS     
B for condition and B for suitability     
Cluny Primary School Mechanical and
Electrical Works
49  49 0 G
Hyhehill Primary School External
Insulated Render
319 106  319 0 G
Milnes HS Roof Covering Replacement 208  20 188 G
New Elgin PS Mechanical and Electrical
Works
406 17  340 66 G
Speyside High School Mechanical and
Electrical Works
370 1  370 0 G
St Gerardines Drainage 3  3 0 G
Pilmuir Primary School Roof Covering
Replacement
9 9 0 G
Forres Academy Drainage 5  5 0 G
Forres Academy Mechanical and
Electrical Works
617 190  674 -57 G
Burghead PS Heating and Pipework
Upgrade
296  395 -99 G
Applegrove Primary School Drainage 5  5 0 G
Andersons Primary School Mechanical
and Electrical Works
206 5  248 -42 G
Andersons Primary School Drainage 7 18  7 (0) G
West End Primary School Heating
Upgrade
305 2  305 (0) G
Kinloss Primary School Heating and
Pipework Upgrade
400 12  417 -17 G
Balance    39 G      
School 3G Pitches     
New 3G Pitches 700  700 0 R
Resurface & rejuvenate 3G pitches in
Moray
300  300 0 G      
Schools Health & Safety     
Fire, Safety and Security - Minor Works 150 17  150 0 G
Legionella works 15 2  15 0 G
Schools - Accessibility 46 7  46 0 G      
Item 9.*
Page 73

Page 74

Other Schools     
New primary school at Findrassie 350  450 -100 A
Lossiemouth High School 608 254  327 281 G
Elgin High School Modular Units 326  326 0 G      
Libraries & Leisure     
Condition Surveys - Other Leisure
Facilities
60 20  20 40 G
Refurbishment & upgrade of pools 300  0 300 R      
ELC Settings 347 22  347 0 G      
Allotments 220  220 0 G      
VEHICULES PLANT & EQUIPMENT     
Libraries & Leisure     
Leisure and Libraries Equipment 60  60 0 G
Moray Leisure Centre 400  0 400 A       
7,090 674 6,127 960 
Page 74

Page 75

REPORT TO:   EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 24 AUGUST 2022   
SUBJECT: EDUCATION RESOURCES AND COMMUNITIES REVENUE
BUDGET MONITORING TO 30 JUNE 2022 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the budget position for Education Resources and
Communities as at 30 June 2022. 
1.2 This report is submitted to Committee in terms of Section III (A) (2) of the
Council’s Scheme of Administration relating to the consideration of capital and
revenue budgets and long term financial plans. 
2.  RECOMMENDATION 
2.1 It is recommended that Committee scrutinises and notes the budget
position at 30 June 2022. 
3. BACKGROUND 
3.1 The report highlights those areas of the budget where there is a significant
percentage variance identified at 30 June 2022. 
4. BUDGET POSITION 
4.1 The spend at 30 June 2022 is £7,826,000 against a budget to date of
£7,929,000, giving an underspend of £103,000 as shown in Appendix 1.  
4.2 The COVID-19 pandemic had a significant impact on income and a £500,000
reduction in the income budget for leisure facilities was approved as part of
the budget report to Moray Council 3rd March 2021. The income is gradually
recovering post Covid and at the end of quarter one there is £106,000 over
achievement on income in leisure facilities. 
4.3 School repairs and maintenance and accessibility budgets are overspent by
£36,000. These budgets relate to small scale, often reactive, spend and are
Item 10.*
Page 75

Page 76

therefore difficult to predict. Large scale school improvement projects are
included in the Capital Plan. 
4.4 Other underspends within the service are Additional Support for Learning
training £4,000 and school counselling £7,000. The underspend in Additional
Support for Learning training is expected to reduce once the new academic
session starts, with additional resource available to provide training from
August onwards funded through the Improvement and Modernisation
Programme. The underspend in school counselling relates to the difference in
funding received from the Scottish Government and the contract spend
following commissioning of an external provider.  
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement 
Plan (LOIP) 
The Education Resouces and Communities Revenue Budget has 
particular reference to National Outcome 8 – we have improved the life 
chances for children, young people and families at risk. 
(b)  Policy and Legal
The Council has statutory responsibilities to meet educational
needs, the needs of children and young people in need and those it
looks after. 
(c)  Financial implications
The resource implications are set out in this report and at Appendix 1.
The underspend as at 30 June 2022 is £103,000 against a budget to
date of £7,929,000. 
(d)  Risk implications
Budget Managers are aware of their responsibilities for managing
budget allocations and approval for any variances will be sought from
Committee in line with the Financial Regulations. 
(e)  Staffing implications
There are no staffing implications associated with this report. 
(f)  Property
There are no property implications associated with this report. 
(g)  Equalities/Socio Economic Impact
An Equality Impact Assessment is not needed because the report is to
inform the Committee on budget monitoring. 
(h)  Climate Change and Biodiversity Impacts
No climate change and biodiversity impacts arise directly from this
report.  
Page 76

Page 77

(i) Consultations
Paul Connor, Principal Accountant and Tracey Sutherland, Committee
Services Officer, have been consulted and are in agreement with the
contents of this report where it relates to their areas of responsibility. 
6. CONCLUSION 
6.1 That Committee scrutinises and notes the budget position as at 30 June
2022. 
Author of Report: Joanna Shirriffs, Head of Education Resources and
Communities 
Nicky Gosling, Accountant 
Background Papers: with authors 
Ref:    SPMAN-9425411-37/SPMAN-9425411-38 
Page 77

Page 78

Page 78

Page 79

Education Resources & Communities Appendix 1
Budget Monitoring Report to 30th June 2022
Service
Revised
Budget 
Budget to
Date 
Actual to
Date 
Variance to
Date  Variance
£'000  £'000  £'000  £'000 %
Communities 1,247 261 256 5 2 %
Culture, Sport & Leisure 4,231 1,117 1,016 101 9 %
Learning Estate 259 57 54 3 5 %
Additional Support Needs 15,368 3,964 3,934 30 1 %
Business Support Unit 1,587 374 370 4 1 %
Education Resources & Communities Management 109 27 27 - -
Schools Repairs & Maintenance 1,065 137 173 (36) (26)%
Public Private Partnership 5,728 1,982 1,987 (5) -
Education Resources 95 14 13 1 7 %
Education Resources & Communities COVID-19 - (4) (4) - -
Education Resources & Communities Efficiency
Savings (538) - - - -
-
Education Resources & Communities
Total 29,151 7,929 7,826 103 -
Item 10.*
Page 79

Page 80

Page 80

Page 81

REPORT TO:   EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE 24 AUGUST 2022 
SUBJECT: LEARNING ESTATE – CLOSURE OF INVERAVON PRIMARY
SCHOOL STATUTORY CONSULTATION 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 The purpose of this report is to seek approval to undertake statutory
consultation on the closure of Inveravon Primary School. 
1.2 This report is submitted to the Council in terms of Section III (D) (7) of the
Council's Scheme of Administration to consider the closure of schools and
other educational establishments under the control of the Council as
Education Authority. 
2.  RECOMMENDATION 
2.1 It is recommended that the Committee: 
(i) authorise a statutory consultation with local stakeholders (Parent
Councils, parents, pupils, staff and the local community) on the
proposal to close Inveravon Primary School attached as Appendix
1; and 
(ii) agree to receive a further report on the outcome of the
consultation in January 2023. 
3. BACKGROUND AND DECISION MAKING ROUTE 
3.1 The Schools (Consultation) (Scotland) Act 2010 requires that local authorities
undertake a formal consultation process whenever changes are proposed to
the school estate, including the proposed closure of a school. 
3.2 The statutory consultation must run for at least 30 days during term time. The
consultation exercise will ensure that any concerns or questions regarding the
proposal can be addressed. A public meeting must be held as part of the
consultation. 
Item 11.*
Page 81

Page 82

3.3 Inveravon Primary School is a remote rural school which is part of the
Speyside Associated Schools Group (ASG).  The Children and Young
People’s Committee agreed on 23 August 2017 (para 9 of the minute refers)
to mothball the school from August 2017 as a consequence of the roll falling
to zero at the end of the academic year 2017/8. 
3.4 Consultation on mothballing the school took place with parents and interested
parties in September 2017.  There was no appetite for the school to remain
open. Although there was a desire to make the building available for the local
community as a hall for activities, this could not be facilitated during
mothballing.   
3.5 Since the school has been mothballed, there have been no requests from
parents to enrol their children at the school during the Primary 1 enrolment
periods in January 2018, January 2019, January 2020 and January 2021.
Consequently, during this period the school has remained mothballed. 
3.6 At its meeting of 24 November 2021 (paragraph 12 of the minute refers), the
Education, Children’s and Leisure Services Committee agreed to the
preparation of an options appraisal regarding the future of Inveravon Primary
School. 
3.7 As part of the options appraisal process a number of engagement sessions
were held with the wider Inveravon community. Comments boxes were made
available in locations around the catchment and an online comments page
was open from 16 February 2022 to gather views from all residents. The
options appraisal document is attached as Appendix 2 to this report, together
with the comments/suggestions received at Appendix 3. 
3.8 Following completion of the options appraisal, the majority of potential uses
would require the building to be discontinued as a primary school for the
Inveravon community. 
3.9 In the event of the building no longer being used for education the land, and
consequently the building, will be handed back to the Ballindalloch Estate.
This limits the Council influence on future use of the land and building,
although all potential uses proposed during the previous community
engagement and future consultation will be passed to the Estate.     
4. PROPOSAL 
4.1 The recommendation of this report is to launch a formal statutory consultation
to permanently close Inveravon Primary School.  The consultation is proposed
to take place during school term time from 29 August to 7 October 2022. 
4.2 To allow for Education Scotland reporting and analysis of the consultation
responses, it is expected that a further report would be circulated for
Committee consideration in November 2022. 
4.3 To ensure a holistic approach officers sought to engage widely to explore
ways to improve educational, social and related opportunities for all children,
young people and the wider community within the Inveravon Primary School
catchment area. Accordingly, engagement with parents and carers was an
essential part of this process.
Page 82

Page 83

4.4 As part of the options appraisal process, the Inveravon community have been
given the opportunity to present alternatives to closure and to present their
views for the authority to consider. 
4.5 Officers have taken many factors into account while completing the options
appraisal and setting out the proposal for closure. However, the main driver
must be that educational benefits are at the heart of any proposal to make a
significant change to Inveravon Primary School, for current and future pupils
in the area. 
4.6 The proposal document regarding the closure of Inveravon Primary School
will be the subject of consultation between 29 August and 7 October 2022.
This adequately covers the required period of 30 days term time consultation. 
4.7 Two public meetings for stakeholders will be held on 27 September 2022. The
first at Inveravon Church at 1.30pm, the second at Speyside High School
Community Centre at 7pm. An online meeting will held on 28 September 2022
at 7pm. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)
This report supports the LOIP outcomes: 
Building a better future for children and young people in Moray: 
• Healthier Children: children get the healthiest start in life and are
supported to achieve the best possible mental health and
wellbeing and there is equity for vulnerable groups. 
And the aims of the Corporate Plan to:
• Improve health and wellbeing for the people of Moray. 
(b) Policy and Legal
The Schools (Consultation) (Scotland) Act 2010 and Children and
Yound People (Scotland) Act 2014 have been referred to and
adhered to and will continue to be during consultation and with
respect to any future decisions on the future of Inveravon Primary
School. 
Title deeds indicate that the school building is on land not owned by
the Local Authority, rather the Owner, Ballindalloch Estate, gave
permission to use the building over a century ago. If there is a future
decision to close the school it will revert back to the Owner. 
The local authority purchased an area of land (0.305 acres) to
extend the subjects in 1926 accordingly Moray Council retain title to
that upon closure. Should the school be closed in the future it is
expected this land will be given back to the Ballindalloch Estate.
Page 83

Page 84

(c) Financial implications
The mothballing of Inveravon Primary School over the last 5 years has
resulted in an annual cost saving of just under £118K. A decision to
close the school would realise a further annual saving of £45,175
(following the 3 year cash conserved salary period). A more detailed
Financial Report is at Appendix 4. 
The reopening of the school would require full remediation of the site,
and significant capital works to the building to achieve overall Condition
B status. The cost of this has been estimated to be over £206k to
support reopening and a further investment of over £130k over the next
5 years. This capital sum is not within the current capital plan. 
If Inveravon Primary School is closed the catchment rezoning options
to adjacent schools in the Speyside ASG could result in an increase in
costs for school transport provision, which would need to be met by
Moray Council. The increase is not expected to be significant and may
be managed within the value of the current Speyside ASG transport
contracts. 
(d) Risk implications
There is a risk, albeit assumed a low one, that the school may be
required to re-open should more pupils come forward as a result of the
community engagement. 
Should the school be required to be operational in the future, Property
have completed a full condition survey to determine any repair and
maintenance costs to return to operational status and the costs of
those are detailed in Section 5c above. 
(e) Staffing implications
Inveravon Primary School is currently in a paired Head Teacher
arrangement with Knockando Primary School. In the event of
Inveravon Primary School closing the implications on Knockando
based Teaching Staff are as per table below. 
FTE (during mothballing) FTE (post closure)
Head Teacher 1.0 (SP4) 1.0 (SP2)
Principal Teacher 1.0 
Head Teacher Relief  0.46
Class Teacher 1.0 1.0
McCrone 0.28 0.28
Total 3.28 2.72 
The Head Teacher would move to SP4 from SP2 – cash conserved for
3 years.  The Principal Teacher would need to be redeployed and
potentially cash conserved for 3 years 
There are no non-teaching staffing implications should Inveravon
Primary School close. 
(f) Property Impact
Whilst the school has been mothballed, the state of the building has
been maintained as wind and water tight. The building has been
Page 84

Page 85

drained down and regular janitor inspections conducted and any
issues, e.g. water ingress, have been addressed. This minimal care
and maintenance regime will continue during and to conclusion of the
statutory consultation process.   
(g) Equalities/Socio Economic Impact
An Equality Impact Assessment (EIA) is a statutory requirement on the
Council to assess the policies and practices necessary to meet the
requirements of anti-discrimination and equalities legislation. It also
affords an opportunity for the Council to consider the impact on the
education service. An assessment has been carried out, as part of the
options appraisal process for Inveravon Primary School. 
The main impact for children in the P1-7 age group is the length of
journey from Inveravon to either Knockando, Aberlour or Glenlivet
primary schools; however, as Inveravon Primary School has been
mothballed since July 2017, the majority of the current pupils are
already making the journey to either Knockando or Aberlour. Should
there be future journeys to Glenlivet these would be of a similar
distance and duration. 
Under the Equality Act 2010 education providers must not treat
disabled pupils less favourably and should take reasonable steps to
avoid putting disabled pupils at a substantial disadvantage. Any
existing arrangements in place for pupils within the schools affected
with additional support needs will continue. As discussed in Appendix 1
Section 10.28 Aberlour Primary School is the enhanced provision hub
for the Speyside ASG, and as such is fully adapted to meet the
requirements of pupils with a range of additional support needs. 
(h) Climate Change and Biodiversity Impacts
A carbon assessment of Inveravon Primary and Knockando Primary,
where the majority of pupils moved to at the time of mothballing, has
been undertaken by the Moray Council Climate Team. 
Overall the carbon impact per pupil is substantially lower at Knockando
– and that includes the pupils on the school roll from the Inveravon
catchment from Aug 2017.  The reopening of Inveravon Primary School
would therefore significantly increase carbon emissions in the future,
outweighing any additional transport emissions associated with longer
pupil journeys.  A closure of Inveravon Primary School is therefore
predicted to lead to carbon savings. 
Further detail on the carbon impacts can be found in Appendix 1,
Sections 14.1 to 14.3 
(i) Consultations
Senior Officers in Education, Education Resources and Communities,
the Head of Housing and Property, the Head of Environmental and
Commercial Services, the HR Manager, Paul Connor, Principal
Accountant, the Legal Services Manager, the Equal Opportunities
Officer and Tracey Sutherland, Committee Services Officer have all
Page 85

Page 86

been consulted and are in agreement with the contents of this report as
regards their respective responsibilities. 
6. CONCLUSION 
6.1 The Committee is requested to consider this report and approve the
recommendation herein to authorise a statutory consultation with local
stakeholders (Parent Councils, parents, pupils, staff and the local
community), in accordance with the statutory requirements of the
Schools (Consultation) (Scotland) Act 2010, on the proposal to close
Inveravon Primary School and rezone in accordance with one of the
options detailed in Appendix 1. 
6.2 The Committee with receive a further report on the outcome of the
consultation process in January 2023.   
Author of Report: Andy Hall (Programme Manager (Learning Estate)) 
Background Papers: 
Ref: SPMAN-9425411-46 
SPMAN-9425411-47 
SPMAN-9425411-48 
SPMAN-9425411-49 
SPMAN-9425411-50 
Page 86

Page 87

1 
Proposal Document 
Closure of Inveravon Primary School 
Consultation open 29th August 2022 to 7th October 2022  
Item 11.*
Page 87

Page 88

2 
This document has been issued by Moray Council in accordance with the
Schools (Consultation) (Scotland) Act 2010 as amended. The Act requires that
changes to the school estate, including the proposed closure of a school, are subject
to rigorous statutory consultation. 
The schools affected by this proposal are: 
• Inveravon Primary School
• Knockando Primary School
• Aberlour Primary School
• Glenlivet Primary School 
DISTRIBUTION 
A copy of this document is available on the Moray Council website: 
http://www.moray.gov.uk/moray_standard/page_105407.html  or by emailing
learningestate@moray.gov.uk 
This document will be made available to:  
• Parent Councils of the schools listed above
• Parents of the pupils at the schools listed above
• Pupils at the schools listed above
• Parents of pre-school age children living within the Inveravon catchment
• Staff at the schools listed above
• Trade union representatives of the above staff
• Speyside Community Council
• Inveravon Community Association
• Knockando Community Association
• Glenlivet and Tomintoul Development Trust
• Education Scotland
MORAY COUNCIL IS PROPOSING, SUBJECT TO THE OUTCOME OF THE
STATUTORY CONSULTATION PROCESS:
• To discontinue education at Inveravon Primary School, which is
currently mothballed and re-assign its catchment area to that of
Knockando and Glenlivet
• The proposal would apply to the primary school stages (P1-P7) of
education in Inveravon, as there is no pre-school education provided
at the school.
• The proposed changes, if approved, will take place immediately
after the conclusion of the statutory process relating to school
closures.
Page 88

Page 89

3 
• Inveravon catchment residents 
Read copies of this document is also available at: 
• Aberlour Library
• Knockando Primary School
• Aberlour Primary School
• Glenlivet Primary School
• Glenlivet Medical Practice
• Ballindalloch Post Office
• Community Centre, Speyside High School
• Elgin Central Library 
Page 89

Page 90

4 
1. Legislative Background 
1.1. The proposal is advanced within the context of all applicable legislation. 
Amongst other duties, education authorities are required to secure adequate
and efficient provision of school education (S.1 of the Education Act 1980); and
to endeavour to secure improvement in the quality of school education in
schools that are managed by them (S.3 of the Standards in Scotland’s Schools
Act 2000).   
1.2. Inveravon Primary School is classed as remote rural school within the terms
of the Schools (Consultation) (Scotland) Act 2010 and the Council has had
regard to the provisions of that Act, in particular the heightened consideration
to be given to rural school closures. In terms of that Act, S7 requires a public
meeting to be held as part of the consultation process. 
2. Introduction 
2.1. Moray Council strives to allocate its resources in a way that ensures the
quality of all of its services. It attaches particular importance to providing the
best possible educational experience for all of the pupils in its schools. 
2.2. This proposal document is focussed upon Inveravon Primary School, located
within Speyside area of Moray, and part of the Speyside Associated School
Group. 
2.3. This proposal document contains several maps. PDF copies of all maps will
be available on the Moray Council website at the address given on page 34 of
this document. Printed copies of the maps will also be available on request in
each of the schools affected by the consultation and at Aberlour Library. 
The consultation will run from Monday 29 August 2022 until Friday 7 October.
Two public meetings will be held on Tuesday 27 September 2022 at Speyside
High School between 7pm and 8pm and Inveravon Church between 1.30pm
and 2.30pm. An online meeting will be held on Wednesday 28 September
2022 between 7pm and 8pm. 
2.4. The consultation process for this proposal is set out in detail in Section 17 of
this document. 
3. Reason for Proposal 
3.1. This proposal is being advanced for the following reasons: 
• No children have attended Inveravon Primary School since the end of
session 2016/17, when the school was mothballed. The decision to mothball
was taken as no pupils were enrolled from Aug 17. 
Page 90

Page 91

5 
• No parents have chosen to enrol their children at Inveravon Primary
School for the 2017/18, 2018/19, 2019/20, 2020/21, 2021/22 or 2022/23
sessions. 
• Although the number of primary school children in the Inveravon
Primary School catchment totals 15 for the 2022/23 session those families
who have formally indicated their choice (9 in total) do not wish to send their
children to Inveravon Primary School as they have settled elsewhere.   
• A school roll of fewer than 15 pupils provides significant impediments
to the successful implementation of a Curriculum for Excellence. 
• A school roll of fewer than 15 pupils hampers social interaction
opportunities for children, who conversely benefit from attending larger
schools amongst more children of their own age. 
• The Council has explored alternatives in arriving at this proposal,
explained further below. 
• Alternative uses of the school building are restricted as the land is
owned by the Ballindalloch Estate and was gifted to Moray Council more than
a hundred years ago. The ‘deeds’ state that in the event of the site not being
used for the education of children the land shall be returned to the Estate 
3.2. The current proposal follows informal discussions between Moray Council
officials; local elected members, the community council and community
members. Informal meetings with the community were held as follows: 
• Community engagement session (virtual) - Wednesday 9 February
2022
• Community engagement session (virtual) - Tuesday 8 March 2022
• Community engagement session at Speyside High School – Tuesday 8
March 2022 
3.3. Letters were sent to every property within the catchment area to inform
residents of the meetings in February 2022, with other contact details if they
were unable to attend. 
3.4. In addition to the engagement session’s comments boxes were made
available in locations around the Inveravon catchment as well as in Glenlivet,
Knockando and Aberlour, and an online comments page was open on the
Moray Council website from 16 February 2022 to gather views from all
residents and people could telephone or email the Learning Estate team. 
3.5. Despite a small uptake in numbers, these sessions proved useful and a
number of suggestions were made over the course of the sessions for use of
the school building – albeit with the understanding that should the school
close these would need to be pursued with the Ballindalloch Estate. 
Page 91

Page 92

6 
4. Examination of Alternatives 
4.1. In bringing forward this proposal for closure, the Council must have special
regard to any viable alternatives to closure. The alternatives to closure would
be: 
• to re-open Inveravon Primary School with its current catchment area or; 
• to continue with the current “mothballing” arrangement. 
4.2. During the community engagement sessions, officers sought suggestions of
alternatives to closure, although it was made clear that where the suggestion
was not education related Moray Council could only note these and would
forward these onto the Ballindalloch Estate for consideration as the land (and
by inference the school building) would be returned to them in the event of a
closure decision. The suggestions included: 
• Community space for activities
• Outdoor activity centre  
• Community cafe
• Rural business centre
• Residential property 
4.3. As none of them involve the building operating as a primary school for local
pupils, they would not be a viable alternative to closure. 
4.4. In the event of a school closure being approved, consideration is required of
the most appropriate way to re-zone the school catchment area. Further
discussion of this is included in Section 7 of this report. 
4.5. The detail of the Council’s consideration of the alternatives is set out
throughout this proposal paper and the Options Appraisal. 
5. Inveravon Primary School 
5.1. During the build up to the closing months of the 2017/18 session it was noted
that a number of children on the school roll were electing to move to
Knockando and Aberlour primary schools. 
5.2. In August 2017, due to no children attending the school from the start of the
new 2017/18 session, the Education Service was left with no alternative but to
take the decision to mothball Inveravon.   
5.3.  The Speyside Associated School group consists of 8 primary schools,
Aberlour, Craigellachie, Glenlivet, Inveravon, Knockando, Mortlach, Rothes
and Tomintoul. Each of these schools is in the catchment for Speyside High
School in Aberlour. 
Page 92

Page 93

7 
5.4. Inveravon Primary School was built in the early 20th century. The school is
non-denominational and serves properties within the rural area of the
Ballindalloch Estate. It is located by the A95 just north of the Bridge of
Inveravon 6.5 miles from Aberlour. 
5.5. Inveravon Primary School catchment is bordered by Aberlour, Glenlivet,
Knockando and Tomintoul schools within the Moray Learning Estate. It is also
bordered to the west by Grantown Primary School in the Highlands Council
area. Map 1 below shows the catchment area for Inveravon Primary School
and the neighbouring schools. 
Page 93

Page 94

8 
Map 1 – Catchment area for Inveravon Primary School and surrounding schools 
5.6. As mentioned in 1.2 under the Scottish Government Guidelines Inveravon
primary school is classed as a remote rural school – that is it serves a
population of less than 3,000 and is more than 30 minutes’ drive from a
settlement of 10,000 or more. 
5.7. Inveravon Primary School has a functional capacity of 50 pupils. It is a single
storey building with two classrooms, kitchen, hall, resources room, library
reception/staff room.  The hall doubles as both a dining room and indoor PE
area. The school has a servery kitchen which served meals that were
prepared at Aberlour Primary and delivered to Inveravon Primary School on a
daily basis. The outside areas consists of a small concrete play area on the
north aspect of the building which extends to adjacent grassed area. 
5.8. Inveravon Primary School delivered primary education from P1-P7. There is
no nursery on site and local children often attended Knockando or Aberlour
nursery. The school did not operate a breakfast club or after school club
outwith school hours. 
5.9. When the school was last in operation, it was managed with a paired head
teacher arrangement with Knockando Primary School. If the school were to
re-open with one class, the staffing entitlements (Full Time Equivalent (FTE))
could be as follows: 
• Head Teacher - 0.5 FTE
• Principal Teacher - 1 FTE
• McCrone support - 0.12 FTE
• Pupil Support Assistant - 25 hours
• Senior Catering Assistant -10 hours
• Playground assistance - 7 hours
• Lunchtime supervisor – 7.5hours   
This would be dependent upon actual school roll and in line with the Moray
Devolved School Management Scheme staffing formula. 
5.10. In addition, any ASN teaching and pupil support staff would be allocated to the
school in accordance with an annual assessment of need across the Speyside
Associated Schools Group. 
5.11. Every local authority in Scotland is required to grade their schools for
condition and suitability. The grades range from A to D for each category with
the following values: 
• A: Good - Performing well and operating efficiently (the school buildings
and grounds support the delivery of services to children and communities)
Page 94

Page 95

9 
• B: Satisfactory - Performing adequately but with minor problems (the
school buildings and grounds support the delivery of services to children
and communities);
• C: Poor - Showing major problems and/or not operating adequately (the
school buildings require continuous repair and does show signs of age/the
school buildings and grounds impede the delivery of activities that are
needed for children and communities in the school)
• D: Bad – Economic life expired and/or risk of Failure (the school buildings
and grounds do not support the delivery of services to children and
communities). 
5.12. Inveravon Primary School was assessed as B for suitability and C for
condition prior to mothballing. A more recent condition survey in June 2022
has assessed the overall condition remains at C although a number of
elements are condition D. A breakdown of the condition elements is shown in
the table below.
Roofs
Floors and Stairs
Ceilings
Ext Walls, Windows and
Doors
Int Walls and Doors
Sanitary Services
Mechanical
Electrical 
Decoration
Fixed Int Fixtures,
Furniture and Fittings
External Areas
Outdoor Sports Facilities
Overall Score
Condition Category
C D C C B C D D C B D N/A 42.27% C
Table 1. Core Condition Assessment (Overall and Individual Elements) 
5.13. There is no current Education Scotland Inspection report available for
Inveravon Primary School. The last report HMIE Inspection Report was
January 2012. 
6. Details of Proposal 
6.1. The Council proposes that Inveravon Primary School should be closed on a
permanent basis. This would be with immediate effect from the completion of
the consultation process. The Council also proposes that all existing primary
aged pupils should continue their education at the schools they are currently
attending. If the proposals are implemented any siblings of these current
pupils would be able to join their brother/sister(s) at the same school. 
6.2. The school catchment area would be reassigned to one of the neighbouring
primary schools. Discussion of these options is set out in Section 7. 
• Option 1 - Close Inveravon Primary School and rezone to Knockando
Primary School.
Page 95

Page 96

10 
• Option 2 - Close Inveravon Primary School and split catchment between
Knockando and Aberlour Primary School.
• Option 3 - Close Inveravon Primary School and split catchment between
Knockando, Aberlour and Glenlivet primary schools. 
Discounted options and alternatives to closure: 
• Option 4 - Close Inveravon Primary School and rezone with Aberlour
Primary School.
• Option 5 - Close Inveravon Primary School and rezone with Glenlivet
Primary School.
• Alternative 1 - Re-open Inveravon Primary School.
• Alternative 2 - Continuation of mothballing Inveravon Primary School 
Details of the Council’s consideration of the alternatives is set out in Section 8
and the discounted options in Section 9. 
6.3. The options identified above would have a minor impact on the rolls of the
schools affected. Table 1 below details the current roll and capacity of these
schools over the next five years as per the Moray Council School Roll
Forecast, using the census taken in September 2021. 
School Suitability
Rating
Condition
Rating
Functional
Capacity
Current
Roll 
(Sep 21)
2022/
2023
2023/
2024
2024/
2025
2025/
2026
Inveravon B C 50     
Knockando B C 75 46 47 51 57 56
Aberlour B B 183 116 111 111 117 119
Glenlivet B C 42 20 19 18 18 18
Table 2. School Roll Forecast 
6.4. Birth rate data included in previous school roll forecasts, indicate that within
the Inveravon catchment area there are around seven that would be expected
to attend Inveravon School within the next three years. These pupils could be
accommodated at either Knockando, Aberlour or Glenlivet primary schools. 
6.5. Alternative uses for the building will be further explored with the community
during the consultation period and beyond. Although in the event of closure
the land and school building will be ‘returned’ to the Ballindalloch Estate,
officers will seek to support individuals and community groups in ensuring any
potential alternative uses suggested are forwarded to the Ballindalloch Estate
for consideration. 
6.6. It is important that this proposal does not have a negative impact upon any
children currently attending schools affected by this proposal and that they
have continuity in their education. 
7. Options Assessment 
7.1. Officers applied an objective methodology to the assessment of the options
which are discussed in Appendix A. 
Page 96

Page 97

11 
7.2. Together with each school’s baseline score and outcome of the options
appraisal matrix, other aspects that were taken into account for the overall
recommendations were: 
• Transport
• Outcome of surveys representing the views of the Inveravon School
catchment parents and wider Inveravon community
• Views of parents and public expressed during engagement sessions
• Financial qualitative information
• Viability and timescale for option to be completed 
7.3. Table 3 below shows the Options final rankings. Option 1, close Inveravon
Primary School has the highest ranking although Option 2 and 3 also score
highly and warrant consideration during the statutory consultation. 
Options Final
Ranking
Option 1 - Close Inveravon Primary School and rezone to
Knockando Primary School. 
1
Option 2 - Close Inveravon Primary School and split
catchment between Knockando and Aberlour Primary
School.
2
Option 3 - Close Inveravon Primary School and split
catchment between Knockando, Aberlour and Glenlivet
primary schools. 
3
Table 3 – Outcome of options appraisal 
7.4. Option 1 - Close Inveravon Primary School and rezone to Knockando
Primary School 
7.4.1 The proposed catchment for this area for this option is shown below in Map 2. 
7.4.2 Knockando Primary School is a multi-building school. The main school
building was built in the early 1900’s with additional two buildings, a gym hall
built in and a dining room and additional classroom constructed in 1960s. It is
situated in the rural area of Knockando, 9.8 miles west of Aberlour and some
6.6 miles from Inveravon Primary School by road. During the period of
mothballing Knockando Primary School has been the designated schools for
pupils in the Inveravon catchment area and has a shared head teacher with
Inveravon Primary School. The school is non-denominational and is classed
as “remote rural” school according to Scottish Government classification. 
7.4.3 The school offers both primary education from P1-P7 and a partner operated
nursery on site.  Accommodation consists of three classrooms for school age
children and one for nursery, a games hall used for PE and a dining block with
both dining room and classroom area. The main building has multiple general-
purpose rooms, library, Head Teacher office, school office and staff room. The
Page 97

Page 98

12 
school has a servery which is designed to provide meals prepared at Rothes
Primary School and delivered to the school on a daily basis. The outside
areas are a concrete area with a small tarmac playground and grassed
playing field area. 
7.4.4 Knockando Primary School has a functional capacity of 75 pupils and a
current roll of 46 P1-P7 pupils (September 2021). These are distributed
across 3 classes. The school roll forecast suggests pupil numbers will see a
small increase to a max of 58 in 2026. This represents a 58% use of capacity. 
Page 98

Page 99

13 
Map 2 – Proposed catchment area with rezoning Inveravon to Knockando Primary
School 
7.4.5 The class structure for the 2021/22 session is shown in Table 4 below 
Stage Class structure
P1/2 9/8
P3/4/5 5/7/4
P6/7 7/6 
Table 4 – Knockando Primary School Class Structure on Census Day 
7.4.6 On census day, there were 14 children from out of zone (including pupils from
Inveravon) who were attending Knockando Primary and 6 children who were
zoned for Knockando who were attending elsewhere. 
7.4.7 Knockando Primary School is currently assessed as B (81.9%) for Suitability
(satisfactory – performing well but with minor problems) and C for Condition
(satisfactory – performing adequately but showing minor deterioration). 
7.4.8 There are pupils from the Inveravon catchment area currently attending
Knockando School who are transported to school within current transport
contracts. With the permanent closure of Inveravon Primary School this
number would remain unchanged. 
7.5. Option 2 - Close Inveravon Primary School and split catchment between
Knockando and Aberlour Primary School 
7.5.1. The proposed catchment for this area for this option is shown below in Map 3
Page 99

Page 100

14 
Map 3 – Proposed catchment area with rezoning Inveravon to Knockando and Aberlour
primary schools 
7.5.2. Information on Knockando Primary School remains as per Section 7.4 
7.5.3. The main Aberlour Primary School building was built in 1897. It is situated in
the centre of Aberlour to the south of the A95, 15 miles south of Elgin and is
6.6 miles from Inveravon Primary School by road. During mothballing a small
number of pupils from the Inveravon catchment have been on the Aberlour
Primary School roll. The school is non-denominational and is classed as
“accessible rural” school according to Scottish Government classification.
Page 100

Page 101

15 
7.5.4. The school offers both primary education from P1-P7 and both a council and
partner operated nursery.  Accommodation consists of eight classrooms for
school aged children, a shared dining room/PE hall, multiple general-purpose
rooms, a library, Head Teacher office, school office, staff room and kitchen.
Aberlour Primary School also hosts the Primary Enhanced Provision base for
children with Additional Support Needs for the Speyside Associated Schools
Group. The outside areas are a concrete area with a tarmac playground and
small grassed play area with access to larger grass playing field across a
residential access road. 
7.5.5. Aberlour Primary School has a functional capacity of 183 pupils and a current
roll of 116 P1-P7 pupils (September 2021). These are distributed across 6
classes. The school roll forecast suggests pupil numbers will remain steady
over the next five years – with a max of 120 in 2027 before falling to 114. This
represents a 58% use of capacity. 
7.5.6. The class structure for the 2021/22 session is shown in Table 5 below 
Stage Class structure
P1 19
P2/3 12/7
P3/4/5 9/7/4
P4/5 7/11
P6 18
P7 22 
Table 5 – Aberlour Primary School Class Structure 
7.5.7. On census day, there were 31 children from out of zone who were attending
Aberlour Primary and 3 children who were zoned for Aberlour who were
attending elsewhere. 
7.5.8. Aberlour Primary School is currently assessed as A (88.9%) for Suitability
(satisfactory – performing well but with minor problems) and C for Condition
(satisfactory – performing adequately but showing minor deterioration). 
7.5.9. There are a small number of pupils from the Inveravon catchment area who
currently attend Aberlour Primary School who do not have an entitlement to
council provided school transport. With this option the permanent closure of
Inveravon Primary School would likely see a small increase in the number of
children entitled to council provided school transport to Aberlour Primary. 
7.6. Option 3 - Close Inveravon Primary School and split catchment between
Knockando, Aberlour and Glenlivet primary schools 
7.6.1 The proposed catchment for this area for this option is shown below in Map 4 
7.6.2 Information on Knockando and Aberlour primary schools remains as per
Sections 7.4 and 7.5.
Page 101

Page 102

16 
7.6.3 The main Glenlivet Primary School building was built in 1900. It is situated in
the rural community of Glenlivet to the south of the A95, 12 miles south-west
of Aberlour and is 5.6 miles from Inveravon Primary School by road. The
school is non-denominational and is classed as “remote rural” school
according to Scottish Government classification. 
7.6.4 The school offers primary education from P1-P7.  Accommodation consists of
two classrooms for school age children, a shared dining room/PE hall, a
library and office/staff room. The school has a servery which is designed to
provide meals prepared at Aberlour Primary School and delivered to the
school on a daily basis. The outside areas are a mix of small tarmac and
grass play areas. 
7.6.5 Glenlivet Primary has a functional capacity of 47 pupils and a current roll of 20
P1-P7 pupils (September 2021). These are distributed across 2 classes. The
school roll forecast suggests pupil numbers will remain steady over the next
five years – with a max of 21 in 2027. This represents a 44% use of capacity. 
Page 102

Page 103

17 
Map 4 – Proposed catchment area with rezoning Inveravon to Knockando, Aberlour
and Glenlivet primary schools 
7.6.3 The class structure for the 2021/22 session is shown in Table 4 below 
Stage Class structure
P1-4 4/1/2/3
P5-7 3/4/4 
Table 6 – Glenlivet Primary School Class Structure 
Page 103

Page 104

18 
7.6.4. On census day, there were 0 children from out of zone who were attending
Glenlivet Primary and 4 children who were zoned for Glenlivet who were
attending elsewhere. 
7.6.5. Glenlivet Primary School is currently assessed as B (81.6%) for Suitability
(satisfactory – performing well but with minor problems) and C for Condition
(satisfactory – performing adequately but showing minor deterioration). 
7.6.6 There are a number of pupils from the Inveravon catchment area currently
attending Glenlivet Primary School. With this option the permanent closure of
Inveravon Primary School would see a small increase in the number of
children entitled to council provided school transport to either Knockando,
Aberlouror Glenlivet. 
8. Alternatives to the Proposal 
8.1. In bringing forward this proposal for closure, the Council must have special
regard to any viable alternatives to closure. 
8.2. The detail of the Council’s consideration of the alternatives is set out below. 
8.3. Re-open Inveravon Primary School with Current Catchment Area 
8.3.1 There are currently 15 children of P1-7 age living within the catchment area of
Inveravon School (SEEMIS extract December 2021). These children all attend
other schools in the area, having submitted successful out of zone placing
requests to attend other schools. 
8.3.2 There are only 12 new houses either allocated within the local development
plan or with approved planning permission within the Inveravon School
catchment area. The site is constrained and no development has yet taken
place, therefore it cannot be guaranteed that new housing will generate any
primary aged pupils in the near future. 
8.3.3 If the school were to re-open, the pupils that reside within Inveravon, who
enrol at the school, would have a slightly shorter journey time than they do at
present. 
8.3.4 Reopening of the school would require full remediation of the site, and
significant capital works to the building to achieve overall Condition B status.
The cost of this has been estimated to be over £206k to support reopening
and a further investment of over £130k over the next 5 years. This capital sum
is not within the current capital plan and would need to be approved as an
additional spend by elected members if Inveravon Primary School were to be
reinstated.  
Page 104

Page 105

19 
8.4 Continuation of “Mothballing” Inveravon Primary School 
8.4.1 Although it would be possible to continue with the current mothballing
arrangement, Moray Council does not consider that would represent the best
option for the community or taxpayer. Mothballing would mean the
continuation of the current lack of clarity regarding the future status of the
school. The Council would also be responsible for the costs of maintaining a
mothballed building. 
8.4.2 Scottish Government guidance relating to the mothballing of schools makes it
clear that mothballing is a temporary measure and should not be used to
undermine the requirements to undertake a statutory school closure
consultation. Inveravon Primary School will have been mothballed for 5 years
at the time this report is submitted. 
8.4.3 As previously stated Inveravon School has not been operational since August
2017. During this period pupils have been either attending Knockando or
Aberlour Primary Schools. This has been a significant period of uncertainly for
families, a continuation of mothballing does not provide clarity to the situation. 
9 Discounted Options 
9.1 The detail of the Council’s consideration of the discounted options is set out
below: 
9.1.1 Option 4 - Close Inveravon Primary School and rezone with Aberlour Primary
School. Although some children within the current Inveravon catchment do
attend Aberlour Primary, and this would remain a parental choice in the future
no matter the outcome of the statutory process, the majority of current parents
have elected to send their children to Knockando. The reasons for this relate
to a smaller school and less distance to travel for the majority of children.
There was no parental support for this full rezoning option.   
9.1.2 Option 5 - Close Inveravon Primary School and rezone with Glenlivet Primary
School. Due to the topographical area – especially the location of school in
relation to the rivers Spey, Avon and Livet and their respective road crossing
this creates excess travel distances between much of the Inveravon
catchment and Glenlivet Primary School. These roads are also predominantly
rural B roads which experience disruption during the winter months. There
was no parental support for this full rezoning option. 
10. Education Benefits Statement 
10.1. In 2009, the Scottish Government set out its Vision for the Future School
Estate in Scotland, in ‘Building Better Schools:  Investing in Scotland’s
Future’.     
10.2. In September 2019, this was updated with Scotland’s Learning Estate
Strategy ‘Connecting People, Places and Learning’ which was developed by
Page 105

Page 106

20 
Scottish Government and COSLA.  This contains ten guiding principles.  Local
Authorities are required to take account of these principles in planning
changes to their school estate, namely: 
• Learning environments should support and facilitate excellent joined up
learning and teaching to meet the needs of all learners; 
• Learning environments should support the wellbeing of all learners,
meet varying needs to support inclusion and support transition for all
learners;  
• The learning estate should be well-managed and maintained, making
the best of existing resources, maximising occupancy and representing
and delivering best value; 
• The condition and suitability of learning environments should support
and enhance their function; 
• Learning environments should serve the wider community and where
appropriate be integrated with the delivery of other public services in
line with the place principle; 
• Learning environments should be greener, more sustainable, allow
safe and accessible routes for walking, cycling and wheeling and be
digitally enabled; 
• Outdoor learning and the use of outdoor learning environments should
be maximised; 
• Good consultation about learning environments, direct engagement
with learners and communities about their needs and experiences, and
an involvement in decision making processes should lead to better
outcomes for all; 
• Collaboration across the learning estate, and collaboration with
partners in localities, should support maximising its full potential; 
• Investment in Scotland’s learning estate should contribute towards
improving learning outcomes and support sustainable and inclusive
economic growth. 
10.3. In May 2016, Moray Council approved the ‘Schools for the Future’:  A policy
for Sustainable Schools’ in order to monitor schools provision in Moray and
ensure provision continues to meet the needs of learners, parents and the
community and enable the Council to meet its requirements to ensure best
value, as per the Local Government Scotland Act 2003.  This policy
contributes to the aim of ensuring all children and young people in Moray have
equality of opportunity in terms of access to educational provision and
facilities.  
Page 106

Page 107

21 
10.4. Within this policy, Moray Council set criteria and indicators in determining
optimum quality education experience which include provision of
accommodation as reported to Children and Young People’s Services
Committee for: 
• The range of curricular and wider school activities available for children to
enable them to achieve in a range of activities for personal and wider
achievement (e.g. physical education, music, art, drama) ; 
• The ability of the school to cater for children with Additional Support
Needs; 
• The school’s ability to provide access to a suitably broad and balanced
curriculum; 
• The quality of the physical environment for learning and teaching   
o Condition - minimum standard B   
o Suitability – minimum standard B   
• No more than two composite year groups in a single classroom at primary
school level.   
• A minimum of four teachers at a primary school. This recognises both the
needs of pupils and the demands on teachers; and. 
• Ideally, at least seven classrooms (one for each year group). 
10.5. Key statutory requirements are further subsumed including delivery of 2 hours
minimum Physical Education as part of National standards, compliance with
statutory legislation in relation to school accommodation and Additional
Support Needs, UNCRC and the overall extent of on-site accommodation and
facilities (including required general purpose spaces, play and social spaces,
staff rest areas and outdoor spaces). 
10.6. Moray’s vision and strategic direction for all involved in Moray Education as
set out in our Education Strategic Plan and Priorities 2020-2023 – improving
outcomes for all Moray’s children and young people – is underpinned by the
core entitlements of Curriculum for Excellence in order to ensure all children
and young people maximise development in the four capacities:  Successful
Learners, Confident Individuals, Effective Contributors and Responsible
Citizens.  This stems from Early Learning and Childcare, across the Broad
General Education and through into the Senior Phase, working across our
system to ensure our learners progress to positive and sustained post-school
destinations.  Underpinned by our Council values of Fair, Ambitious,
Improving and Responsive we are ambitious to achieve excellence together in
benefit of all Moray’s children and young people.
Page 107

Page 108

22 
10.7. In order to deliver on our Education strategic vision and priorities, all Moray
schools thus work towards: 
• Improving outcomes for all:  help improve levels of children and young
people’s achievements and broaden the range of opportunities for young
people to develop their skills; 
• Curriculum:  provide a quality curriculum and create positive environments
for effective learning and teaching matched to the needs of learners; 
• Learning, teaching and assessment:  create the conditions for greater
personalisation and choice for children and young people with improved
continuity and progression in their learning; create more opportunities for
children and young people to participate in well-judged paired and group
activities; 
• Supporting all learners:  develop a supportive ethos where children and
young people’s learning, personal, social, health and emotional needs
address the care and welfare of children and young people and their
personal and social development.   
• Leadership at all levels:  strong, sustainable schools providing quality
education and access to the full curriculum are central to the achievement
of this vision and delivering these entitlements. 
10.8. As further educational context, Curriculum for Excellence guides us to achieve
transformation in education in Scotland by providing a coherent, more flexible
and enriched curriculum from 3 to 18 firmly focused on the needs of the child
and young person and designed to enable them to become successful
learners, confident individuals, responsible citizens and effective contributors.
All children and young people are entitled to experience:   
• a coherent curriculum from 3 to 18;   
• a broad general education, including well planned experiences and
outcomes across all the curriculum areas. This should include
understanding of the world and Scotland’s place in it and understanding of
the environment;   
• a senior phase which provides opportunities for study for qualifications and
other planned opportunities for developing the four capacities;   
• opportunities for developing skills for learning, skills for life and skills for
work;   
• opportunities to achieve to the highest levels they can through appropriate
personal support and challenge; and, 
Page 108

Page 109

23 
• opportunities to move into positive and sustained destinations beyond
school; 
10.9. Educational benefits are considered below for pupils in respect of options
previously outlined in this proposal document. 
10.10. In December 2020, Moray Council approved the approach to the Moray
Learning Estate Strategy, setting out the vision of providing a sustainable
education service aiming for excellence.  As well as improving condition and
suitability as noted in 10.4 above, among wider outcomes this strategy aims to
ensure our learning estate enriches the learner journey and supports
curricular delivery noting the quality of learning environment as having a direct
impact on learning and achievement of children and young people.   
10.11. Ensuring all young people develop in the four Curriculum for Excellence
capacities through the learner entitlements in 10.8 above would prove more
challenging if Inveravon Primary School were to reopen with a reduced
number of pupils across the Primary age range.  This will also place discrete
pressures on staff, for example in planning for a wide range of needs, year
groups and abilities, in developing the curriculum and managing educational
change.  As a result, multi-stage composite classes can prove challenging to
recruit teachers compared with larger schools where classes have single or
few stage composite arrangements. 
10.12. Pupils attending schools within the Speyside Associated Schools Group in
closest proximity to Inveravon Primary School; Aberlour, Glenlivet and
Knockando Primary Schools, regularly work in pairs and groups on shared
learning tasks and cooperative learning activities.  A school size low in pupil
numbers, for example in a school of 5 or fewer children, based on potential
future intake if Inveravon Primary School re-opened, would mean that groups
would be curtailed in size restricting activities to those of a paired nature, with
little to no flexibility in change or rotation of participants in pairings or
groupings.  Pupils could be spread multi-stage across P1 to P7, and while
benefitting cross-stage working, this may result in reduced peer challenge in
learning or potential for sibling pairing/groups.  The variety of skills, knowledge
and wider experiences brought to the groups would be further restricted by roll
size and may result in gender imbalances and inequity in provision of a full
programme of wider school activities. 
10.13. In comparison as the smallest school based on the three named closest to
Inveravon Primary School, Glenlivet Primary School operates within a pairing
under a shared Head Teacher, school roll projections over the next five years
remain near to 20 children on roll, with partnership approaches in place with
the paired school; Tomintoul Primary School.  This includes joined projects
and staff professional and collegiate development activities while both schools
retain their own unique identities.  Children have regular opportunities to self
and peer assess in each school as well as work in stage and cross stage
pairings and groups. 
Page 109

Page 110

24 
10.14. In Aberlour and Knockando Primary Schools, children have regular
opportunities to work in cooperative learning groups, on paired and in group
activities with five and three classes formed in each school respectively.  This
further supports discussions and debate with a range of viewpoints and
background of learners contributing to such activities.  Class organisation
within each school offers a blend of individual, group and class learning and
teaching over the session. 
10.15. The reopening of Inveravon would prove more restrictive for children to
develop skills for learning, life and work with fewer or no opportunities to work
with others of a similar age and stage, which is not possible in a school size
low in pupil numbers, for example in a school of 5 or fewer children based on
potential future intake.  Pupils may miss opportunities to develop wider skills
for life in particular with limited immersion and interaction with a wide range of
peers, where levels of attendance and participation may also impact further on
this. 
10.16. In Knockando, a skills framework has been developed following refresh of the
school’s Curriculum Rationale.  This promotes equity of opportunity,
supporting successes and achievement of all pupils within the formal and
informal curriculum.  Children use learning logs to reflect on skills
development.  In Glenlivet, curricular programmes that support sustained
development of skills for learning, life and work have been developed where
STEM (Science, Technology, Engineering and Maths), and the Career
Education Standards/Career Management Skills are specific within the
school’s skills development pathway and staff continually look for ways to
ensure children are challenged and motivated in learning.  As the largest
school in the Associated Schools Group, children at Aberlour Primary School
benefit from wider skills development and transferability through various
community projects and whole-school initiatives supported by partners
including Primary Engineer, Christmas Enterprise, DYW initiatives and Moray
Primary Science.  Aberlour Primary School’s Skills Progression “Skills for
Stars” lead to weekly OSCARS (Our School Can Achieve Results) which link
to profiling and the Moray Skills Pathway. 
10.17. Collaboration with wider staff in order to ensure a coherent and progressive
curriculum can prove more difficult in a school with low roll size.  As noted with
Glenlivet Primary School paired with Tomintoul Primary School, a progressive
curriculum differentiated to meet the needs of each child with a focus on
engaging and active learning experiences is in place with opportunities for
personalisation and choice across the four contexts for learning.  Rich
contexts for learning including the outdoor areas are embraced with child-led
developments.   
10.18. In Aberlour Primary School, the curriculum supports children to develop in the
four capacities with planned inter-disciplinary learning for the transfer of skills
and knowledge with a commitment to active learning and purposeful play.  At
Knockando Primary School, there is a focus on skills development and
building on prior learning through cohesive learner pathways making the best
use of the outdoors and local context.  Children are increasingly benefitting
Page 110

Page 111

25 
from a range of play contexts that are adult-led, adult-guided or child-
initiated.  Pupils are developing social skills for sharing, co-operation, turn-
taking, listening and organising through play.  At Glenlivet Primary School,
children have ‘independent learning time’ each day with child-led and adult-led
play.  A dedicated outdoor space supports development of a range of play and
skills-based activities. 
10.19. Strong partnerships across the Speyside Associated Schools Group exist with
previous joint working on moderation, numeracy, health and wellbeing policy
and wider curriculum development.  Each school values community and wider
partnerships for supporting the Developing the Young Workforce agenda and
ensuring children are prepared for the future world of work and
employability.  At Glenlivet Primary School, partnership working further
supports skills development and curriculum enrichment where involvement in
partnership projects enables pupils to build confidence and take increasing
responsibility for their own learning – for example, learning for sustainability,
science, expressive arts and literacy.  Key partnerships with Tomintoul and
Glenlivet Landscape, Crown Estates, Spey Fishery Board and Glenlivet
Wildlife group have supported this.   
10.20. In Knockando Primary School, a range of partners and local employers
including Tamdhu Distillery, Knockando Estate, Knockando Athletics Club and
the Shieling Project offer opportunities to learn and be active outdoors.  Pupils
at Aberlour Primary School have opportunities to engage with local employers
and parents as employees for future employability and pathway opportunities,
alongside working closely with partner agencies as the Enhanced Provision
school for the Associated Schools Group.  Schools in the Associated Schools
Group also collaborate, including a week’s residential stay at Abernethy
Outdoor Centre for wider outdoor pursuit experience, team building and
transition support.   
10.21. Larger schools provide greater opportunities for pupil leadership and
involvement in the ethos and wider life of the school as well as provision of a
wider range of clubs and extra-curricular activities.  At Aberlour Primary
School, P7 House Captains and P6 Vice-Captains are elected each year to
lead ‘houses’, pupil voice activities and inter-house challenges including
sporting events, and contribute to whole school change
initiatives.  Community groups include Eco-schools, Rights Respecting
Schools group (successful in achieving ‘Gold’ status), philanthropic and
community engagement activities.  Staff lead a range of clubs and activities
for all children including Bikeability, Running, Languages, Outdoor Learning,
Choir, Nurture, Craft, Netball, Gardening and Leadership. P7 Play Leaders
further develop their leadership skills through the ‘Playground Squad’, leading
play activities and supporting lunchtime interaction sessions for younger
pupils. 
10.22. Play leaders at Knockando Primary School have been working with Active
Schools to support play and lunchtime interactions and activities for younger
pupils.  This ensures that all pupils feel included at playtimes and lunchtimes
and for the P6 and P7 pupils involved, this is further developing skills of
Page 111

Page 112

26 
leadership, organisation and problem solving.  Other opportunities include
Pupil Council, Global Citizenship, Community groups and wider pupil projects
to enhance the school and local community.  Lunchtime clubs include Club
Doodle, Netball Club, Book Club and Gardening Club where pupils also
engage in dance/performance, athletics and wider Moray Badge participation. 
10.23. At Glenlivet Primary School, child-led developments have led to
enhancements to school grounds and a cross-pollination investigation led to
bee-keeping at the school.  Real-life scientific and environment studies
including Citizen Science research, the Big Wasp survey and RSPB Bird
Watch further promote curiosity among learners, where a range of Monday
clubs are also offered including Health club, STEM club and Rights
Respecting School club led by the pupils.  Through ‘Glenlivet Go Getters’
(Pupil Council) all children make a significant contribution to school leadership
of change and views are taken on board. Bronze ‘Rights Committed’
accreditation has been achieved at Glenlivet with the school currently working
towards Rights Respecting Schools’ Silver ‘Rights Aware’ accreditation. 
10.24. The range of interactions offered by all schools and the leadership and wider
skills development opportunities presented strengthen capacity to work with
others as part of a team, problem solve, make decisions and increase
confidence in learners.  As part of a peer group of a sufficient size, social
interaction will enable further development of skills for learning life and work
and build self-efficacy and esteem.  A school size low in pupil numbers, for
example in a school of 5 or fewer children based on potential future intake
severely restricts opportunities for team sports, meaningful pupil leadership
opportunities, clubs and other active recreational activities. 
10.25. Aberlour, Glenlivet and Knockando Primary Schools are established as
caring, nurturing and inclusive environments for learning.  Aberlour Primary
School as the largest Primary School in the Speyside Associated Schools
Group holds Gold Rights Respecting Schools status and through their positive
relationships policy, aim to ensure all in the learning community are committed
to the school vision – ‘we show respect and have fun so we can learn from
everyone’.  Pupil achievements are regularly celebrated and ‘OSCARS’ (Our
School Can Achieve Results) focused on the four CfE capacities in 10.8
above, are awarded to pupils in recognition of their positive contribution and
achievements in learning. 
10.26. Knockando Primary School is a caring and inclusive school, where staff work
hard to get to know pupils and families well, supporting individual needs.  A
relational and restorative approach is taken to positive relationship
management where the school is on the journey to Gold Rights Respecting
School status.  The school’s Positive Relationship Policy has been developed
and shared with the school community with focus on inclusion, safeguarding,
mental and emotional wellbeing and accessing supports.   
10.27. Glenlivet Primary School has a very caring, nurturing and inclusive ethos with
strong community identify due to unique school location.  Individual reflective
portfolios and learning logs support children to reflect on their learning against
Page 112

Page 113

27 
the four capacities and development of skills.  Regular reflection against the
school’s ‘Smarts’ is undertaken by children to understand aspects of their own
wellbeing.  Staff actively promote inclusion and equity for all children and due
to size of school and one large multi-composite class, pupils are grouped by
ability as opposed to stage, strengthening pace and challenge in learning.  In
collaboration with all children, Glenlivet Primary School has developed a new
Positive Relationships Policy reflecting the United Nations Convention on the
Rights of the Child (UNCRC). 
10.28. Aberlour Primary School has the Primary Enhanced Provision base for
children with Additional Support Needs for the Associated Schools
Group.  Most children attend for part of the time, also attending mainstream
classes.  ‘The Rainbow Room’ provides specialist support for identified young
people and support on group and one-to-one basis.  Multi-agency links are in
place with key partners including Health, Social Work and 3rd sector. 
10.29. At Knockando Primary School, class teachers support all children where
required with support assistant input for targeted need.  Currently the Head
Teacher in class contact time supports in provision of additional Support for
Learning Teacher time, ensuring all children are supported as part of Moray’s
approach to staged intervention.  In Glenlivet Primary School, effective
planning to meet the needs of all learners, with clear progression pathways
and universal/targeted interventions where necessary.  A Support for Learning
teacher works with identified pupils over two days per week with Pupil Support
Assistant time for targeted needs. 
10.30. All schools within Speyside Associated Schools Group benefit from their
location in an area of outstanding natural beauty with access to extensive
grounds and countryside.  As a town school, Aberlour Primary School is in
close proximity to Speyside High School as the local secondary school, with
access to a range of external areas including a playing field, outdoor garden
area and hard-standing playground/parking area.  The school currently
houses a local authority and partner nursery.  The school is within walking
distance of the secondary school’s swimming pool, community sport facilities
and multi-use games area.   
10.31. The catchment of Knockando Primary School enjoys large grounds with easy
access to woodland, fields, burns and wildlife supporting outdoor learning
contexts.   During snowy weather, the hill next to the school is used as a
sledge/ski run.  The school is well resourced with outdoor playing fields and
play areas and additional multi-use spaces.  With extensive outdoor areas or
within close proximity to wider facilities in the case of Aberlour Primary
School, opportunities for team sports and game-based activities can be
maximised with a number of pupils on the roll of all three schools enabling
such activities. A larger staffing complement and parent body further
increases the likelihood of interested adults leading a broader range of
activities. Glenlivet Primary School pupils regularly use the woods located
behind the school for outdoor learning.  A community playpark organised by
the Go Getters funded by Pupil Equity Funding and other community monies
(Paul’s Hill Windfarm and the Glenlivet and Inveravon Community
Page 113

Page 114

28 
Association) is used by children during school time and is available for
community use outwith school times. 
10.32. Aberlour, Glenlivet and Knockando Primary Schools are committed to the 1+2
languages agenda.  French is offered across all three schools with the
addition of German in P5-P7.  This provides the opportunity to work as a
whole class and in small groups or pairings in participatory learning activities. 
Emphasis is on the spoken word and opportunities are planned through
enjoyable activities such as group and class games, role-play and songs. 
Delivery of language learning would be restricted within the multi-stage
context of a school size low in pupil numbers, for example in a school of 5 or
fewer children based on potential future intake.  At Glenlivet Primary School,
to meet the needs of current children in school, British Sign Language (BSL)
will be delivered as a third language this coming year instead of German. 
10.33. Aberlour, Glenlivet and Knockando Primary Schools benefit from a very small
amount of Pupil Equity Funding and use this creatively to support identified
children, with interventions reaching further than those where impact is
directed.  Aberlour Primary School focus in on Literacy interventions,
Numeracy and Health & Wellbeing approaches.  Glenlivet Primary School has
identified gaps in Health and Wellbeing and run a successful Breakfast club,
improving engagement in learning.  In order to support Health and Wellbeing
for all, swimming lessons have been provided where half of the school had
never swam, building confidence in swimming, team working and wider
mental, physical and social wellbeing effects.  Knockando Primary School has
supported literacy, numeracy and Health and Wellbeing with the purchase of
various learning supports including additional Pupil Support Assistant hours
for targeted support and Health and Wellbeing inputs.   
10.34. Schools also look outwards and seek to source additional supports and wider
experiences for children.  Heritage Lottery Funding supported Glenlivet
Primary School in a four year programme with a group of artists, significantly
developing children’s artistic and digital technology skills.  Although this
project has now finished, a legacy of skills and equipment remain which
Glenlivet continues to make use of for learning and teaching. 
10.35. Aberlour, Glenlivet and Knockando Primary Schools all have Parent Councils
formed who meet regularly throughout the year.  Aberlour Primary School
Parent Council represent the views and interests of parents and pupils and
support school improvement where there are currently ten parent members. 
Glenlivet Primary School regularly engages with parents and a supportive
Parent Council take forward an active role in driving forward school
improvement.  There is a very strong sense of community with the school
vision ‘success for all’ understood by all.  Sustainable partnerships with
parents and the wider community further enrich the curriculum and children
are supported to take an active part in the school and wider community. 
10.36. At Knockando, an active and supportive Parent Council fundraise for school
trips and activities and also contribute to bringing in specialists to enhance the
curriculum with dance, sport, music, drama and outdoor education.  Parents
Page 114

Page 115

29 
may also use their individual skills to support learners through ‘Activity
Afternoons’.   If Inveravon were to re-open then there would be potential for a
Parent Council to operate.  However, with a small pupil cohort there would be
a limited number of families able to participate – particularly where sibling
groups may feature – resulting in greater reliance on a few individuals to
support the school in this way.   
10.37. Aberlour, Glenlivet and Knockando Primary Schools are central
establishments within their respective communities with strong links to other
organisations including local churches.  Effective transition programmes and
links with other Associated School Group schools including Speyside High
School as the local secondary school are in place.  Working in collaboration
across the Associated Schools Group, Head Teachers and schools ensure all
children continue to access a wide range of experiences and activities,
ensuring their location does not detract from opportunities available. 
Glenlivet, Knockando, Tomintoul and Craigellachie Primary Schools also work
in partnership to organise transition events throughout the year for Primary 7
pupils, to support team building and wider skills development in advance of
secondary transition.   
10.38. Section 3 of the Standards in Scotland’s Schools etc Act 2000 requires local
authorities to endeavour to raise standards and secure improvement in the
quality of school education provided in our schools for all learners.  It is Moray
Council’s view that the pupils from the Inveravon catchment derive
educational benefits from their current attendance at other larger neighbouring
schools. Formalising the current arrangements would provide a number of
such benefits, judged against both the Moray and National criteria set out
above. 
10.39. As all pupils from the Inveravon Primary School catchment currently attend
Knockando Primary School or Aberlour Primary School depending on current
zoning arrangements or parental choice, no adverse effects for those pupils
are expected to arise from the permanent closure of Inveravon Primary
School. 
11. Effect on the Local Community 
11.1. Moray Council recognise that the uncertainty surrounding the future of the
school has impacted on the community and it is hoped that this statutory
consultation to close Inveravon Primary School will give clarity to the
community and a sense of certainty regarding their children’s education. 
11.2. Inveravon Primary School is situated in a rural location, with no
public/community buildings close by.  Inveravon Church is a short distance
from the school with a limited amount of dedicated parking. 
11.3. Several meetings have been held with the local community and parents in the
catchment area of the school. Although attendance at these meetings was
low, representatives from the Community Association raised concerns that
Page 115

Page 116

30 
there would be no community space in the area such as a meeting place,
picnic or play area for the community. 
11.4. Prior to the school closing the church had occasional community use of
Inveravon Primary School and there was also a badminton club that used the
school hall.  There has been no community use of the land or building since
the school was mothballed in 2017. 
11.5. The site is owned by the Ballindalloch Estate and was ‘gifted’ to Banffshire
Council in early 20th century for educational use. Moray Council are currently
‘custodians’ of that gift and if the school is closed the land and buildings would
revert back to estate ownership.  Ballindalloch Estate would welcome input
from the community as to sustainable options for the building and land use
should the proposal to close the school be approved. 
11.6. Tomintoul and Glenlivet Development Trust conducted some consultation with
the community in April 2021 about general community priorities, including
community assets.  The community expressed three favoured options for the
future use of the school: 
• Reinstated as a school
• Community space for activities
• Outdoor activity centre   
11.7. Aberlour is the closest town, approximately 6 miles from the school, with
public amenities, including a swimming pool, high school, local shops and
public parks.   Knockando and Glenlivet Primary School are equidistance from
the school, approximately 6 miles. 
12. School Transport 
12.1.  During the 2016/17 session entitled pupils were provided with transport to
Inveravon Primary School at a cost of £208.34 per day. With mothballing
pupils were provided transport to Knockando Primary School on existing
contracts at no additional cost. 
12.2. Three new contracts currently support ALL pupils attending Knockando
Primary School at a total cost of £557.55 per day. Ten pupils within the
Inveravon catchment are transported to Knockando schools. 
12.3. The closure of Inveravon School will not impact upon the current journey
times for the majority of catchment pupils as they are currently being
transported to Knockando. The average travel time compared to travelling
to/from Aberlour or Glenlivet primary schools would be the same as
Knockando Primary School under normal conditions. 
Page 116

Page 117

31 
12.4. It is recognised that rezoning some areas of the Inveravon catchment to
Aberlour or Glenlivet primary schools may increase the number of children
entitled to school transport. 
13. Financial Implications 
13.1. As mentioned in Section 12 above the proposed changes could result in an
increase in costs for school transport provision, which would need to be met
by Moray Council. The increase is expected not to be significant and may be
managed within the value of the current Speyside ASG transport contracts. 
13.2. Further details of the financial impact of this proposal are included in the
financial template provided at Appendix B. The costs provided in the template
derive from 2016/17 when the school was last operational for a full session,
which has been corrected for inflation to provide a forecast for 2022/23 if
Inveravon Primary School was reopened. With a potential school roll of 5 this
would equate to a cost of £31,415 per pupil per year against a Moray average
of £7,225 per pupil per year (2019/2020 data). 
14. Sustainability 
14.1. A carbon assessment of Inveravon Primary and Knockando Primary - where
the majority of pupils moved to at the time of mothballing - by the Climate
Change Strategy Officer is summarised in the table below: 
Building Heat  Electricity Water Total 
CO2
Emissions
(Tonnes)
Carbon
Impact
per
Pupil
CO2
Emissions
(Tonnes)
Carbon
Impact
per
Pupil
CO2
Emissions
(Tonnes)
Carbon
Impact
per
Pupil
Annual
CO2
Emissions
(Tonnes)
Inveravon
(2016/17) 
27.2 3.0 3.4 0.4 0.06 0.007 30.66
Knockando
(2017/18) 
24.4 0.4 14.9 0.3 0.16 0.003 39.46 
14.2. The additional school transport mileage associated with travel to and from
Knockando Primary School for pupils local to Inveravon Primary School
requires to be considered but as there are no fixed school transport routes -
contractors are given a pupil address list and work out the most efficient route
- it is therefore not possible to assess the detailed impact of the additional
mileage with mothballing or closure of Inveravon Primary School. 
14.3. Overall the carbon impact per pupil is substantially lower at Knockando – and
that includes the pupils on the school roll from the Inveravon catchment from
Aug 2017.  The reopening of Inveravon Primary School would therefore
significantly increase carbon emissions in the future, outweighing any
additional transport emissions associated with longer pupil journeys.  The
Page 117

Page 118

32 
closure of Inveravon Primary School is therefore predicted to lead to carbon
savings for Moray Council. 
14.4. Teacher recruitment and retention is a challenge faced by many rural
authorities in Scotland. Rural schools with small numbers of pupils on roll
changes the teaching dynamic, requiring teachers to be highly adept in
managing the curriculum, differentiation and assessment for pupils from
primary 1 - 7 in one or just two classes to ensure an educational benefit is
maintained.  Due to the staffing complement within these establishments the
opportunities for collegiate and stage partner working requires carefully
planning with their paired school or others local schools within the ASG and
increased use of digital resources to allow online communities, however some
rural settings also have connectivity difficulties. 
15. Implications for Staff 
15.1. As a consequence of mothballing an interim teaching staff arrangements were
implemented as per the table below. There were no changes to non-teaching
support staff. 
FTE (before mothballing) FTE (post mothballing)
Head Teacher 0.5 1.0
Principal Teacher 1.0 1.0
Class Teacher 1.0 1.0
McCrone 0.28 0.28
Total 2.78 3.28 
15.2. In the event of Inveravon Primary School closing the amended teaching staff
arrangement are as per table below 
FTE (during mothballing) FTE (post closure)
Head Teacher 1.0 (SP4) 1.0 (SP2)
Principal Teacher 1.0 
Head Teacher Relief  0.46
Class Teacher 1.0 1.0
McCrone 0.28 0.28
Total 3.28 2.72 
The Head Teacher would move to SP4 from SP2 – cash conserved for 3
years.  The Principal Teacher would need to be redeployed and potentially
cash conserved for 3 years. 
16. Equal Opportunities 
16.1. An Equality Impact Assessment (EIA) is a statutory requirement on the
Council to assess the policies and practices necessary to meet the
requirements of anti-discrimination and equalities legislation. It also affords an
Page 118

Page 119

33 
opportunity for the Council to consider the impact on the education service. An
assessment has been carried out, as part of the options appraisal process. 
16.2. The aim of an EIA is to examine policies and practice in a structured way to
make sure that adverse effects on groups with protected characteristics are
avoided. It is also a tool to enable the Council to assess what positive steps it
can take to promote equality of opportunity and measure the results of the
actions that have been taken. 
16.3. The main adverse effect for children in the P1-7 age group is the length of
journey from Inveravon to Knockando, Aberlour or Glenlivet, however, as the
school has been mothballed since July 2017, all the current pupils are already
making the journey to either Knockando or Aberlour. Should there be future
journeys to Glenlivet these would be of a similar distance and duration. 
16.4. Funded school transport would be provided for all entitled P1-7 pupils
attending Knockando, Aberlour or Glenlivet primary schools from the current
Inveravon catchment area, if one of the proposed options is approved. 
16.5. As part of the consultation process the Council will consult with a wide range
of stakeholders, including staff, parents/carers and young people, and will
address comments about equality during this consultation. 
16.6. Under the Equality Act 2010 education providers must not treat disabled
pupils less favourably and should take reasonable steps to avoid putting
disabled pupils at a substantial disadvantage. Any existing arrangements in
place for pupils within the schools affected with additional support needs will
continue. As discussed in 10.28, Aberlour Primary School is the enhanced
provision hub for the Speyside ASG, and as such is fully adapted to meet the
requirements of pupils with a range of additional support needs. 
17. Consultation Arrangements 
17.1. At its meeting on 24 August 2022, Moray Council’s Education, Communities
and Leisure Services Committee were asked to agree that a proposal
document should be issued as a basis for consultation. No decision will be
taken by the Council on the proposal contained in the paper until after the end
of the consultation period. The Council will then receive a report on the
consultation and will reach a view on the proposal. 
17.2. A copy of this document will be issued to all of the consultees listed on the
first page of this document and it will also be published on the Council’s
website:  http://www.moray.gov.uk/moray_standard/page_105407.html       
17.3. Reading copies of this proposal document will be made available at Speyside
High School Community Centre, Aberlour Library, Glenlivet Medical Centre,
Ballindalloch Post Office, Elgin Library, Knockando Primary School, Aberlour
Primary School and Glenlivet Primary School. 
Page 119

Page 120

34 
17.4. The period for consultation will run from 29 August 2022 until 7 October 2022
which adequately covers the statutory requirement period of 30 school days. 
17.5. A face-to-face public meeting will be held at 1:30pm on Tuesday 27
September 2022 at Inveravon Church, Ballindalloch AB37 9BA. A further
public meeting will be held at 7pm on Tuesday 27 September at Speyside
High School, Mary Avenue, Aberlour AB38 9QU. Anyone wishing to attend the
meetings are welcome. 
17.6. An online meeting will be planned for Wednesday 28 September and anyone
wishing to attend this meeting should express their interest by emailing
learningestate@moray.gov.uk 
17.7. The meetings will be convened by the Council and the Council will present the
reasons for bringing forward the proposal. There will be an opportunity for
questions and comments at both meetings. A minute will be taken so that
comments can later be summarised and considered. 
17.8. Opportunities will be provided for the staff working in Knockando, Aberlour
and Glenlivet primary schools to discuss the proposals. Opportunities will also
be arranged for impacted primary pupils at each of the schools to engage in
the consultation in a manner appropriate to their age. 
An online survey will be available as part of the consultation. This can be
completed at the following address -
http://www.moray.gov.uk/moray_standard/page_105407.html -  or by scanning the QR
code below: 
17.9. The Council will also consider any written comments which should be emailed
to LearningEstate@moray.gov.uk . Alternatively, any comments can be sent
to Community Support Officer (Learning Estate), HQ Room 207a, Elgin
Council Offices. High Street Elgin IV30 1BX. Comments should be received
no later than 4pm on 7 October 2022. 
17.10. A copy of this document will also be sent to Education Scotland. They will also
receive a copy of any relevant written representations that are received by the
Council during the consultation period. They will also receive a copy of any
oral representations made at the public meeting and a copy of any other
Page 120

Page 121

35 
relevant documentation. Education Scotland will then prepare a report on the
educational aspects of the proposal. In preparing their report, they may visit
the school and make such reasonable enquiries as they consider appropriate. 
18. Consideration of Consultation Responses 
18.1. The Council will review the proposal having regard to the Education Scotland
Report, survey results, written representations that it has received, and oral
representations made to it by any person at the public meeting. It will then
prepare a report on the consultation. This report will be published in electronic
format and will be available on the Council website. Anyone making written
representations during the consultation period will be informed about the
report. 
18.2. The report will include a record of the total number of written representations
made during the consultation period, a summary of the written representations
and a summary of the oral representations made at the public meeting. The
report will also include the Authority’s response to the Education Scotland
Report, a response to issues raised through any written or oral
representations it has received, together with a copy of the Education
Scotland Report and any other relevant information, including details of any
alleged inaccuracies and how these have been handled. The report will also
contain a statement explaining how the Council has complied with the
requirement to review the proposal in light of the Education Scotland Report
and representations (both written and oral) that it received. 
18.3. The last section of the report will include an officer recommendation as to
whether the proposals should be adopted and implemented. The Consultation
Report will be published at least three weeks prior to the Council making a
decision. 
18.4. A final report on the consultation process with recommendations will
submitted to the Education, Childcare and Leisure Services Committee in
January 2023. 
19. Decision Making 
19.1. The consultation report will be considered by Education, Communities and
Leisure Services Committee who will be asked review and make a comment
on the officer recommendation. 
19.2. Following discussion and recommendation at the Education, Communities
and Leisure Services Committee, Full Council will consider the report and be
asked to approve the officer recommendation in the report. This is expected to
be February 2023. 
19.3. At the end of the consultation process, Section 15 of the Schools
(Consultation) (Scotland) Act 2010 enables ministers to call-in a decision to
implement the proposed closure of Inveravon Primary School. 
Page 121

Page 122

36 
19.4. Beginning on the day that the final decision is taken, the Council has a period
of six working days to notify Scottish Ministers of the decision. Scottish
Ministers then have a period of eight weeks from and including the date of
decision to decide if they will call in the proposal. The Council must publish
the fact that the Scottish Ministers have been notified and that representations
can be made to the Scottish Ministers within the first three weeks of the eight-
week period. The Scottish Ministers will take into account any relevant
representations that were made to them by any person within the first three
weeks. The Council may not proceed with the implementation of the proposal
until this eight-week period has passed. 
19.5. If the Scottish Ministers decide to call in a closure proposal, it is then referred
to the Convener of the School Closure Review Panels who has a period of
seven days after a call-in notice is issued to constitute a School Closure
Review Panel. The Panel may decide to refuse consent to the proposal,
refuse consent and remit it to the education authority for a fresh decision or
grant consent to the proposal, either subject to conditions, or unconditionally.
The Panel must notify the education authority of its decision within eight
weeks from when the Panel was constituted or within 16 weeks if the Panel
has issued a notice to the education authority that a decision has been
delayed. The Council may not proceed with the implementation of the
proposal until the outcome of the call-in has been notified to the Council. 
20. Conclusion 
20.1.  Taking the above into account Moray Council recommends that Inveravon
Primary School, currently mothballed, is closed and the catchment area re-
assigned to either Knockando Primary School, a combination of the
Knockando and Aberlour primary schools or a combination of Knockando,
Aberlour and Glenlivet primary schools as outlined in Options 1-3 above. 
20.2. Whichever decision is taken with respect to catchment areas, existing pupils
will not be required to change schools. This will also apply to any younger
siblings of such pupils, provided they remain at the same primary school. 
20.3. This proposal paper is issued in terms of the authority’s procedures to meet
the relevant statutory requirements. 
Appendix A - Inveravon Primary School Options Appraisal
Appendix B – Inveravon Primary School Financial Report 
Page 122

Page 123

1 
Appendix 2
Inveravon Primary School Options Appraisal 
1. Introduction 
Moray Council strives to allocate its resources in a way that ensures the quality of all
its services. It attaches particular importance to providing the best possible
educational experience for all pupils within its schools.  
The Strategic Approach to the Learning Estate was agreed at a Special Meeting of
the Moray Council on 9 October 2020 in accordance with Scotland’s Learning Estate
Strategy (Connecting People, Places and Learning). The Council’s strategy sets out
the council’s aspirations for our schools using a holistic place-based approach, which
will ensure that services can be delivered in an optimum way, making best use of
available assets.
The Schools (Consultation) (Scotland) Act 2010 requires that educational benefits
should be at the heart of any proposal to make a significant change to schools, for
current and future pupils in the area.  
At its meeting on 24 November 2021, the Education, Children’s and Leisure Services
Committee agreed to the preparation of an options appraisal regarding the future of
Inveravon Primary School and supported community engagement as part of the
options appraisal process to identify alternative options to consider. 
2. Background / Discussion 
During the 2016/2017 school session the school roll at Inveravon Primary School
dropped due to a number of families moving schools for several reasons. As the
school session drew to a close it was clear that there was a risk that at the start of the
2017/2018 session that the school roll would be significantly lower than the total
catchment of 13. In fact, as of August 2017 the school roll was zero as all catchment
children were enrolled at either Knockando or Aberlour Primary.
Due to no children attending the school for the start of the new 2017/18 session, the
Education Service was left with no alternative but to mothball Inveravon Primary
Item 11.*
Page 123

Page 124

2 
School. Mothballing is a temporary closure of a school which does not in itself lead to
statutory consultation. Reference is made to the report considered by the Children
and Young People’s Committee on 23 August 2017 where this decision was ratified. 
The Primary 1 admission period for all Moray Schools takes place in January each
year. No applications to Inveravon Primary School have been received since the
school was mothballed.  
The deadline for submitting out of zone placing requests is March each year. There
have been no applications received for pupils wishing to attend Inveravon Primary
School through the placing requests process over the last three years.   
As there continues to be no expectation of pupils enrolling at Inveravon Primary
School, the school remains mothballed.  
3. Community Engagement 
The Learning Estates Team conducted the following engagements with the wider
Inveravon community to keep them fully informed and to explore potential options for
the future of Inveravon Primary School.  
• Wednesday 9 February 2022 – A virtual community engagement session
facilitated by MS Teams. 
• Tuesday 8 March 2022 - A virtual community engagement session facilitated
by MS Teams. 
• Tuesday 8 March 2022 - Community engagement session at Speyside High
School
• February to June – A comments form was provided – both online and mailed
to parents within catchment – to allow community stakeholders to provide informal
comments and suggestions on the future of Inveravon Primary School. This has been
available since 16 February 2022 to 28 June 2022.   
A summary of all comments gathered during and following the meetings and the online
survey is at Appendix A to this report. 
4. Options Appraisal 
An options appraisal has been undertaken to consider the future of Inveravon Primary
School to ensure the best educational and wellbeing benefits for Inveravon children.
The appraisal considered the current mothballing and the schools the families had
chosen to attend prior to and during mothballing.    
Page 124

Page 125

3 
4.1 Inveravon Primary School
The majority of the Inveravon Primary School was ‘gifted’ to the Council by the
Ballindalloch Estate in 1910 as a site for a school. A further area of land was
purchased by the Council in 1926 to increase the available land for outdoor play. In
the event of a school closure the land, and by implication the school building would
be returned to the Ballindalloch Estate. The plot of land purchased is deemed of
having no value in isolation and it is proposed that this is gifted to Ballindalloch Estate
at no cost in the event of school closure.
Inveravon Primary School was built in the early 20th century. The school is non-
denominational and serves properties within the rural area of the Ballindalloch Estate.
It is located by the A95 just north of the Bridge of Inveravon 6.5 miles from Aberlour. 
Inveravon Primary School has a functional capacity of 50 pupils. It is a single storey
building with two classrooms, kitchen, hall, resources room, library reception/staff
room.  The hall doubles as both a dining room and indoor PE area. The school
floorplan is attached as Appendix B and a map of the school ground and its
surrounding amenities is shown in Map 1 below. 
Map 1 – Inveravon Primary School 
The school has a servery kitchen which served meals that were prepared at Aberlour
Primary and delivered to Inveravon Primary School on a daily basis.
The outside areas consists of a small concrete play area on the north aspect of the
building which extends to adjacent grassed area
Inveravon Primary School delivered primary education from P1 to P7. There was no
nursery on site and local children often attended nursery at other nearby schools.       
Page 125

Page 126

4 
Condition is an assessment of the physical condition of the school building and its
grounds. Inveravon Primary School was assessed C for condition a number of years
prior to mothballing. A more recent condition survey in June 2022 has assessed that
the overall condition remains at C (Poor - Showing major problems and/or not
operating adequately - the school buildings require continuous repair and shows
signs of age), although a number of elements are now at condition D (Bad –
Economic life expired and/or risk of Failure (the school buildings and grounds do not
support the delivery of services to children and communities). A breakdown of the
condition elements is shown in the table below. 
Roofs
Floors and Stairs
Ceilings
Ext Walls, Windows and
Doors
Int Walls and Doors
Sanitary Services
Mechanical
Electrical 
Decoration
Fixed Int Fixtures,
Furniture and Fittings
External Areas
Outdoor Sports Facilities
Overall Score
Condition Category
C D C C B C D D C B D N/A 42.27% C
Table 1. Core Condition Assessment (Overall and Individual Elements) 
Suitability is an assessment of the school as a whole, the buildings, the grounds and
the impact they have on teaching and learning, leisure and social activities, as well as
the health and wellbeing of users. The Suitability assessment of Inveravon Primary
School was carried out in 2013 the school was graded as B, satisfactory – performing
well but with minor problems (school buildings and grounds generally support the
delivery of services).  
4.2 Inveravon and Local Area
The Scottish Government Urban Rural Classification defines Inveravon Primary
School as “remote rural”, meaning that is it serves a population of less than 3,000 and
is more than 30 minutes’ drive from a settlement of 10,000 or more.
The Inveravon Primary School catchment is bordered by Aberlour, Glenlivet,
Knockando and Tomintoul schools within the Moray Learning Estate. It is also
bordered to the west by Grantown Primary School in the Highlands Council area.
Map 2 below shows the catchment area for Inveravon Primary School and the
neighbouring schools.  
Distances between Inveravon School and surrounding schools sourced from Google
Maps are listed below: 
Knockando Primary School   6.6 miles 
Aberlour Primary School     6.6 miles 
Glenlivet Primary School    5.5 miles 
Page 126

Page 127

5 
In addition, the distance to the Speyside High School, in Aberlour is 6.7miles
The Scottish Index of Multiple Deprivation (SIMD) is a measure of deprivation across
6,976 data zones. SIMD ranks data zones from most deprived (ranked as 1) to least
deprived (ranked as 6,976) and the Inveravon data zone (South Speyside and
Cabrach) is ranked at 3696. Within this ranking geographical access is the biggest
level of deprivation, followed by Education/Skills. Income and Employment are
relatively good while Crime and Health are ranked as the least deprived. A graphical
breakdown of this information is below. 
Table 2. SIMD 2020 Ranking - South Speyside and Cabrach  
Page 127

Page 128

6 
4.3 Rural Sustainability and Housing Development
Inveravon is within a community located within the Ballindalloch Estate area with basic
services including a combined rural shop and post office. The community straddles a
fast-flowing section of the main Elgin to Grantown-on-Spey trunk road (A95). 
Information received from The Council’s Community Economic Development Team
indicates that there are no significant new business activities in the Inveravon area. 
There is no significant housing development for the Inveravon catchment within the
current Local Development Plan. 
4.4 Demographics and Pupil Numbers  
In the 5 years up to the mothballing of Inveravon Primary School in Aug 2017 the
school roll remained steady at between 14-15 pupils with few placing requests to and
from the catchment.   
The school roll had been low for a number of years.  The P1 intake had ranged from
zero to four pupils in each of these years.  The position is shown in the table below: 
Census data 2014 2015 2016 2017 2018 2019 2020 2021
P1-P7 15    15  13   0   0  0   0   0  
Table 3 - School Roll Data 2014-2021
There are currently 15 children of P1-P7 age residing within the catchment area of
Inveravon School (Census data extract September 2021). These children all attend
other schools in the area, all by parental choice. The majority attend Knockando
Primary School with a smaller number at Aberlour School. 
School roll forecasts show a very small number of families living in the catchment area
with children that are under school age.  SEEMIS data indicates there were 2 children
within the Inveravon catchment that could have enrolled for P1 in August 2022 but no
requests were made. A similar number of children can enrol in 2023 and 2024 but if
they did the school roll numbers would remain below 10.
4.5 Occupancy
In line with the Learning Estates Strategy an ideal school occupancy level would be
approximately 80%, aspiring to the occupancy band of between 60% and 80%. 
At its peak the school roll had 15 pupils in the 2014-2015 session – an occupancy of
just 30%. Such a low occupancy level is unsustainable, unaffordable and does not
offer best value. 
Page 128

Page 129

7 
4.6 Pupil Enrolments
No families have approached Moray Council to enrol their children at Inveravon
School, either as a new P1 start or as a placing request. Additionally, no families have
approached officers to indicate that if there were sufficient other families in a similar
position that they would consider moving their children back to the school. 
4.7 Inveravon Community  
While in operation, the school did not operate a breakfast or after school club and
there were no formal lets of the school. The children and the community did have free
access to the school garden and the hall for badminton.  
Speyside Community Centre is adjacent to Speyside High school and is approximately
6.7 miles away.  The Community centre has a swimming pool, fitness suite, climbing
wall and outdoor pitches with a regular programme of activities.  Both the School and
Community centre has a range of rooms and facilities for hire for activities such as
exercise classes, courses, committee meetings, sports and hobbies, counselling
sessions, training sessions and rehearsals.
Glenlivet Public Hall is approximately 6.1 miles away, the hall is used by a number of
groups for regular weekly meetings involving sports, music, dancing and more. 
Beside these regular user the hall aims to provide a venue for other public events. 
Behind the hall there is a football pitch.  The football pitch is used regularly by the
football and archery clubs and can be booked for private events.
4.8 Options for Consideration 
Some comments proposed that the school reopen. However, this requires families
wishing to send their children to the school. As no new pupil enrolments had been
received for the 2022-23 session, reopening of the school was not possible. On this
basis the school continues to be mothballed.    
Alternative suggestions for the school building were received with the focus on
community use and economic development. Due to the land ownership situation these
options would require commitment from other agents. These options cannot be
implemented without the formal closure of the school.  
A full list of suggestions and comments with an overview of the requirements for them
to be implemented can be found in the below table.  
No. Comment/Suggestion  Requirement for implementation 
1  Community space for activities School closure process - private
provider commitment
2  Outdoor activity centre   School closure process - involvement
of private provider
Page 129

Page 130

8 
3  Community cafe School closure process - private
provider commitment
4  Rural business centre  School closure process - private
provider commitment
5  Residential property  School closure process - private land
owner commitment
Table 4 – Alternative use suggestions 
The following options were considered for the future of Inveravon Primary School as
part of the options appraisal: 
1 Reopen the school – No pupils have enrolled at the school and no families
have indicated that they would wish to attend the school. This option has been
discounted. 
2 Continue Status Quo – School remains mothballed for a further session and
potentially beyond. The school has been mothballed since August 2017, such
prolonged time has already caused uncertainty for families and the community.
Therefore, this option has been discounted. 
3 Consider closing Inveravon Primary School and rezoning pupils to attend
another school in the Speyside Associated Schools Group. 
5. Conclusion 
One of the options identified as part of the appraisal is to close Inveravon School. This
is currently considered to be the only viable option for the school; therefore, Moray
Council must undertake a statutory consultation under the Schools (Consultation)
(Scotland) Act 2010. As a rural school there is a presumption against closure and
Moray Council must ensure all other alternatives have been identified and robustly
considered prior to undertaking any statutory consultation on this matter.   
Appendix A - Community Engagement Comments and Suggestions
Appendix B - Inveravon School Floorplan  
Page 130

Page 131

9 
Appendix A – Community Engagement Comments and Suggestions 
(Received during informal engagement) 
The Learning Estate team engaged with the community over 4 sessions in order to
fully inform and explore the potential options on the future for Inveravon Primary
School.  
• 7 December 2021 – online Public meeting with the community and
parents to outline future engagement.
• 2 February 2022 – online public meeting to discuss future options for the
school.
• 8 March 2022 – community engagement session at Speyside High
School, Aberlour to further explore options.
• 10 March 2022 – meeting with parents at Knockando Primary School.
• 16 February 2022 to present – comment boxes available, and
opportunity to send comments via email to the Learning Estate Team. 
Residents in the catchment area were notified of the meetings by two mail drops. 
Details of the meetings were also published on the Moray Council website, social
media channels and distributed to the local media.  
Secure comment boxes were situated at Aberlour Library, Knockando Primary School
and Glenlivet Medical Practice from February to June 2022.  6 parent and 19 resident
comment were received during this period.
The table below provides an overview of the Comments and Suggestions from
community engagements (February 2022 - June 2022) 
Ref
No.
Comment/Suggestion Wants Requirements
for
implementation
1 Email – Parent (Inveravon
Catchment)
Whilst it would be lovely for our son to
attend school much closer to home than
Knockando, I strongly feel that the
quality of his social and academic
education should come first. Unless the
school roll can be reliably and
consistently at a level to facilitate age
appropriate group learning and play
activities then I would not support the
reopening of Inveravon Primary. By this,
I'm not an expert, but I would be
thinking in the order of 25+ pupils.
There is so much to be gained in the
social interactions and the things that
are possible with the increased 
School closure  School closure
Process
Page 131

Page 132

10 
numbers at the combined provision, but
for current skills development and in
preparation for high school and
beyond. 
A number of years ago there was
suggestion of a new build combined
school for Knockando, Inveravon and
Glenlivet at a site in Marypark. This
would have been excellent. 
I am very happy with the calibre of
teaching and support at Knockando, but
modern facilities (and space!) would
really benefit all the pupils. 
Whatever decision is made it must be
one that is in the best interests of
current and future pupils. 
I am well aware personally and
professionally of the implications in
regard to transport etc., but do not find
these unresolvable. 
There are of course wider community
benefits that come from having a school
facility in a rural community, but these
should not overshadow the main
function of the building. 
2 Inveravon Community Resident
(Meeting):
Any local parent looking for options for
schools would not see the school on
any part of the council website.  
School closure  School closure
Process
3 Survey – Parent (Inveravon
Catchment)
Children at Knockando their whole
school life.  Another starting in August. 
If they went to Inveravon they would be
in class by themselves which would be
unsettling for the child.
School closure School Closure
Process
4 Inveravon Community Resident
(Meeting):
Would love to make use of the school if
possible for community-based activities.   
Community
Space
School closure
Process –
Community
Commitment
5 Inveravon Community Resident
(Meeting):
Just looks like closing by stealth, take
the teachers away, head hunted, supply
teachers, no wonder the pupils were
taken elsewhere, a calculated move to
close it. 
Addressed at
meeting
6 Tomintoul and Glenlivet Trust   
Page 132

Page 133

11 
The trust conducted some consultation
with community in April 2021 about
general community priorities.  Included
community assets within the survey.  
3 main views around the school: 
o (1) Reinstated as school, 
o (2) Community space for
activities 
o (3) Outdoor activity centre 
School re-
opened 
Community
Space 
School closure
Process –
Community
Commitment
7 Inveravon Community Resident
(Meeting):
How irritating it is when you keep saying
that there has been no-one interested in
joining the school, it was taken off the
website and people told on the phone
that school was closed, no wonder there
has been no interest, teacher head
hunted 
Addressed at
meeting
8 Inveravon Community Resident
(Meeting):
How many schools have been
mothballed in the last 10 years? 
Addressed at
meeting
12 Inveravon Community Resident
(Meeting):
Problem with getting roll over 10, unless
you get 10 sets of parents, it’s a catch-
22 
Addressed at
meeting
13 Inveravon Community Resident
(Meeting):
If and when council decide it is to be
closed, does council make it habitable? 
Addressed at
meeting
14 Inveravon Community Resident
(Meeting):
Why did it take so long from mothballing
in 2017 until now to progress the future
of Inveravon PS? 
Addressed at
meeting
15 Inveravon Community Resident
(Meeting):
Have we had any formal response from
parents of primary school children in
Inveravon catchment? 
Addressed at
meeting
16 Inveravon Community Resident
(Meeting):
Has and will the building be kept wind
and water tight and repair and
maintenance be undertaken while
school remains moth balled? 
Addressed at
meeting
17 Inveravon Community Resident
(Meeting): 
Addressed at
meeting
Page 133

Page 134

12 
Will this repair and maintenance activity
include the garden and grounds?
18 Is there anything of any value within the
school that could be reused – or
donated (e.g. Ukrainian appeal)? 
Followed up post
meeting
19 Inveravon Community Resident
(Meeting):
Can you confirm who would be
responsible for the building in the event
of its closure? 
Addressed at
meeting
20 Inveravon Community Resident
(Meeting):
Having attended Inveravon Primary
myself as a child and now seeing my
children currently attend Knockando
Primary I feel the resources are/can be
better used by directing them fully to
Knockando.  I feel the school at
Knockando is very well run (in our
experience) and being part of a slightly
larger school community with access to
better resources if far more beneficial
for our children.  Families have the
option of applying to Aberlour &
Glenlivet also which again fields
resources/funding to established
learning communities.
Rural schools are very important but in
this case our family feels there are
better opportunities at other schools
which would be further enhanced if
funding was not re-directed to re-
opening Inveravon and rather put
towards the other ‘rural’ schools still
open in the area.
I have very fond memories of my time at
Inveravon but in this current age, this
school is no longer sustainable in my
opinion. 
School
Closure 
School Closure
Process
22 Survey – Parent (Inveravon
Catchment)
Close it, sell it! 
School
Closure 
School Closure
Process
22 Survey – Parent (Inveravon
Catchment)
As a parent of 2 school aged children, I
feel Inveravon needs closed completely,
ASAP. My children are very happy
attending Knockando Primary School
and I would not be moving then under
any circumstances. 
School
Closure 
School Closure
Process
Page 134

Page 135

13 
It also seems unfair that Knockando
Primary cannot have a permanent Heat
Teacher until this is resolved.
23 Survey – Parent (Inveravon
Catchment)
We feel Inveravon Primary should be
closed and financial & staff resources
should be consolidated to provide a
modern equipped resource for the wider
area. 
School
Closure 
School Closure
Process
24 Survey – Parent (Inveravon
Catchment)
I think Moray Council needs to fully close
Inveravon as it is just wasting money which
could be used to improve education
elsewhere in the area.  There will never be
enough children to deem the school fit to be
open so it needs to be closed not
mothballed. 
School
Closure 
School Closure
Process
25 Inveravon Community Resident
(Meeting):
This was a lovely primary school which was
very outgoing in the community.  Even
though I live in Aberlour I attended the PTA
quiz nights, etc. 
It is so sad not to see the building in use for
it’s intended purpose – as it is one of the
basics of a community. 
I really hope that it will be re-opened. 
School re-
opened 
Page 135

Page 136

14 
Appendix B: Inveravon School Floorplan 
Page 136

Page 137

Appendix 3 
Community Engagement Comments and Suggestions 
(Received during informal engagement) 
The Learning Estate team engaged with the community over 4 sessions in order to
fully inform and explore the potential options on the future of Inveravon Primary
School.  
• 7 December 2021 – online Public meeting with the community and parents to
outline future engagement.
• 2 February 2022 – online public meeting to discuss future options for the
school.
• 8 March 2022 – community engagement session and Speyside High School,
Aberlour to further explore options.
• 10 March 2022 – meeting with parents at Knockando Primary School.
• 16 February 2022 to present – comment boxes available, and opportunity to
send comments via email to the Learning Estate Team. 
Residents in the catchment area were notified of the meetings by two mail drops. 
Details of the meetings were also published on the Moray Council website, social
media channels and distributed to the local media.  
Secure comment boxes were situated at Aberlour Library, Knockando Primary School
and Glenlivet Medical Practice from February to June 2022.  6 parent and 19 resident
comment were received during the period.
The table below provides an overview of the Comments and Suggestions from
community engagements (February and March 2022) 
Ref
No.
Comment/Suggestion Wants Requirements
for
implementation
1 Email – Parent (Inveravon
Catchment)
Whilst it would be lovely for our son to
attend school much closer to home than
Knockando, I strongly feel that the
quality of his social and academic
education should come first. Unless the
school roll can be reliably and
consistently at a level to facilitate age
appropriate group learning and play
activities then I would not support the
reopening of Inveravon Primary. By this,
I'm not an expert, but I would be
thinking in the order of 25+ pupils.
There is so much to be gained in the
social interactions and the things that
are possible with the increased 
School closure  School closure
Process
Item 11.*
Page 137

Page 138

numbers at the combined provision, but
for current skills development and in
preparation for high school and
beyond. 
A number of years ago there was
suggestion of a new build combined
school for Knockando, Inveravon and
Glenlivet at a site in Marypark. This
would have been excellent. 
I am very happy with the calibre of
teaching and support at Knockando, but
modern facilities (and space!) would
really benefit all the pupils. 
Whatever decision is made it must be
one that is in the best interests of
current and future pupils. 
I am well aware personally and
professionally of the implications in
regard to transport etc., but do not find
these unresolvable. 
There are of course wider community
benefits that come from having a school
facility in a rural community, but these
should not overshadow the main
function of the building. 
2 Inveravon Community Resident
(Meeting):
Any local parent looking for options for
schools would not see the school on
any part of the council website.  
School closure  School closure
Process
3 Survey – Parent (Inveravon
Catchment)
Children at Knockando their whole
school life.  Another starting in August. 
If they went to Inveravon they would be
in class by themselves which would be
unsettling for the child.
School closure School Closure
Process
4 Inveravon Community Resident
(Meeting):
Would love to make use of the school if
possible for community-based activities.   
Community
Space
School closure
Process –
Community
Commitment
5 Inveravon Community Resident
(Meeting):
Just looks like closing by stealth, take
the teachers away, head hunted, supply
teachers, no wonder the pupils were
taken elsewhere, a calculated move to
close it. 
Addressed at
meeting
6 Tomintoul and Glenlivet Trust   
Page 138

Page 139

The trust conducted some consultation
with community in April 2021 about
general community priorities.  Included
community assets within the survey.  
3 main views around the school: 
o (1) Reinstated as school, 
o (2) Community space for activities 
o (3) Outdoor activity centre 
School re-
opened 
Community
Space 
School closure
Process –
Community
Commitment
7 Inveravon Community Resident
(Meeting):
How irritating it is when you keep saying
that there has been no-one interested in
joining the school, it was taken off the
website and people told on the phone
that school was closed, no wonder there
has been no interest, teacher head
hunted 
Addressed at
meeting
8 Inveravon Community Resident
(Meeting):
How many schools have been
mothballed in the last 10 years? 
Addressed at
meeting
12 Inveravon Community Resident
(Meeting):
Problem with getting roll over 10, unless
you get 10 sets of parents, it’s a catch-
22 
Addressed at
meeting
13 Inveravon Community Resident
(Meeting):
If and when council decide it is to be
closed, does council make it habitable? 
Addressed at
meeting
14 Inveravon Community Resident
(Meeting):
Why did it take so long from mothballing
in 2017 until now to progress the future
of Inveravon PS? 
Addressed at
meeting
15 Inveravon Community Resident
(Meeting):
Have we had any formal response from
parents of primary school children in
Inveravon catchment? 
Addressed at
meeting
16 Inveravon Community Resident
(Meeting):
Has and will the building be kept wind
and water tight and repair and
maintenance be undertaken while
school remains moth balled? 
Addressed at
meeting
17 Inveravon Community Resident
(Meeting):
Will this repair and maintenance activity
include the garden and grounds? 
Addressed at
meeting
Page 139

Page 140

18 Is there anything of any value within the
school that could be reused – or
donated (e.g. Ukrainian appeal)? 
Followed up post
meeting
19 Inveravon Community Resident
(Meeting):
Can you confirm who would be
responsible for the building in the event
of its closure? 
Addressed at
meeting
20 Inveravon Community Resident
(Meeting):
Having attended Inveravon Primary
myself as a child and now seeing my
children currently attend Knockando
Primary I feel the resources are/can be
better used by directing them fully to
Knockando.  I feel the school at
Knockando is very well run (in our
experience) and being part of a slightly
larger school community with access to
better resources if far more beneficial
for our children.  Families have the
option of applying to Aberlour &
Glenlivet also which again fields
resources/funding to established
learning communities.
Rural schools are very important but in
this case our family feels there are
better opportunities at other schools
which would be further enhanced if
funding was not re-directed to re-
opening Inveravon and rather put
towards the other ‘rural’ schools still
open in the area.
I have very fond memories of my time at
Inveravon but in this current age, this
school is no longer sustainable in my
opinion. 
School
Closure 
School Closure
Process
22 Survey – Parent (Inveravon
Catchment)
Close it, sell it! 
School
Closure 
School Closure
Process
22 Survey – Parent (Inveravon
Catchment)
As a parent of 2 school aged children, I
feel Inveravon needs closed completely,
ASAP. My children are very happy
attending Knockando Primary School
and I would not be moving then under
any circumstances. 
School
Closure 
School Closure
Process
Page 140

Page 141

It also seems unfair that Knockando
Primary cannot have a permanent Heat
Teacher until this is resolved.
23 Survey – Parent (Inveravon
Catchment)
We feel Inveravon Primary should be
closed and financial & staff resources
should be consolidated to provide a
modern equipped resource for the wider
area. 
School
Closure 
School Closure
Process
24 Survey – Parent (Inveravon
Catchment)
I think Moray Council needs to fully close
Inveravon as it is just wasting money which
could be used to improve education
elsewhere in the area.  There will never be
enough children to deem the school fit to be
open so it needs to be closed not
mothballed. 
School
Closure 
School Closure
Process
25 Inveravon Community Resident
(Meeting):
This was a lovely primary school which was
very outgoing in the community.  Even
though I live in Aberlour I attended the PTA
quiz nights, etc. 
It is so sad not to see the building in use for
it’s intended purpose – as it is one of the
basics of a community. 
I really hope that it will be re-opened. 
School re-
opened 
Page 141

Page 142

Page 142

Page 143

Appendix 4
Inveravon Primary School - Financial Report
Table 1 Column 1 Column 2 Column 3 Column 4 Column 5 Column 6 Column 7 Column 10
Row 1
Row 2
Name of School
Inveravon Primary School
Costs for full
financial year
(2016/2017 annual
costs)
Costs financial year
(2022/23 Forecast  annual
costs IF REOPENED)
Additional financial
impact on receiving
schools [Knockando] - note 2
Annual recurring
savings (column 3
minus column 4)
Capital Costs School Proposed for
Closure Receiving School
Row 3 School Costs Capital Life Cycle cost - note 7 -                                   -                                 
Row 4 Employee Costs Third party contributions to capital costs -                                   -                                 
Row 5 Staff Costs - note 1 113,106.00£                      142,721.00£                      38,730.00£                                               103,991.00£                        
Row 6
Row 7 Property Costs:
Row 8 property insurance 460.92£                              460.92£                              460.92£                                property insurance 460.92£                          
Row 9 non domestic rates 100% rural relief 100% rural relief 100% rural relief non domestic rates 100% rural relief
Row 10 water & sewerage charges 347.00£                              795.00£                              795.00£                                water & sewerage charges 141.00£                          
Row 11 energy costs 6,577.00£                           8,415.00£                           8,415.00£                             energy costs 439.00£                          
Row 12 cleaning (contract or inhouse) 81.00£                                82.00£                                82.00£                                  cleaning (contract or inhouse) -£                                
Row 13 building repair & maintenance 576.00£                              576.00£                              576.00£                                building repair & maintenance - note 1,336.00£                      
Row 14 grounds maintenance 650.00£                              650.00£                              650.00£                                grounds maintenance 655.00£                          
Row 15 facilities management costs - note 6 -£                                    -£                                      facilities management costs - note 6 -£                                
Row 16 revenue costs arising from capital -£                                    -£                                      revenue costs arising from capital -£                                
Row 17 other -£                                    -£                                      other
Row 18 PROPERTY COSTS SUB-TOTAL 8,691.92£                           10,978.92£                         10,978.92£                           TOTAL ANNUAL COST UNTIL DISPOSAL 3,031.92£                      
Row 19 School Operational Costs:
Row 20 learning materials 1,460.00£                           1,449.00£                           1,449.00£                             Table 4
Row 21 catering (contract or inhouse) -£                                     
Row 22 furniture and equipment 231.00£                              230.00£                              230.00£                                -£                                
Row 23 other school operational costs (e.g. licences) 485.00£                              484.00£                              484.00£                                TOTAL NON-RECURRING REVENUE COST -£                                
Row 24 Curricular and Staff Support 350.00£                              346.00£                              346.00£                               
Row 25 Transport costs: note 3 208.34£                              557.55£                              557.55£                                                    -£                                     
Row 26 staff travel 309.00£                              310.00£                              310.00£                               
Row 27 -£                                     
Row 28 SCHOOL OPERATIONAL COSTS SUB-TOTAL 3,043.34£                           3,376.55£                           3,376.55£                            
Row 29 SCHOOL COSTS 124,841.26£                      157,076.47£                      118,346.47£                        
Row 30
Row 31 UNIT COST PER PUPIL PER YEAR (5) 24,968.25£                         31,415.29£                        
Assumed No of Pupils 5
1. The annual recurring savings on staff is the difference between school open and mothballed. A further saving of £45,175 will be realised if Inveravon is closed and after
cash conserved salary periods end (3 years from closure).
2. Due to small pupil numbers and no staff taken on during mothballing of Inveravon there is no impact on staff costs at either Aberlour or Glenlivet primary schools if
rezoned
3: Cost for pupil transport was not impacted when temporary rezoning to Knockando on mothballing of Interavon. Similarly the recontracting for 21/22 would not be
impacted in Inveravon did reopen
Notes
Table 3
Current revenue costs for school proposed for closure Table 2
Annual Property costs incurred (mothballing) until closure
Non-recurring revenue costs
Item 11.*
Page 143

Page 144

Page 144

Page 145

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 24 AUGUST 2022 
SUBJECT: INFORMATION REPORT: EARLY LEARNING AND CHILDCARE –
CAPACITY AND DEMAND FOR FUNDED CHILDCARE PLACES
UPDATE 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the registration process for funded Early Learning
and Childcare (ELC) places, the current demand for ELC places within Moray
including projected population by each Associated School Group (ASG) area
and the capacity for funded ELC places within Moray. 
1.2 This report is submitted to Committee in terms of Section III (D) (1) of the
Council's Scheme of Administration relating to all the functions of the Council
as an Education Authority. 
2. BACKGROUND 
2.1 Local authorities in Scotland have a statutory legislative duty to provide 1140
hours of funded early learning and childcare to all 3-4 year olds and eligible 2
year old children. 
2.2 This is delivered by a combination of local authority nurseries, independent
(private and third sector) ELC partner provider nurseries and partner provider
childminders. Moray currently has 24 local authority nurseries, 39 partner
provider nurseries and 37 partner provider childminders. 
2.3 Attendance at early learning and childcare is not statutory, and it is for parents
to decide whether they want their child to participate.   
2.4 Children’s eligibility for funded childcare is determined by date of birth as per
the below chart: 
Session 2022/2023
A child whose date
of birth is between:
Will be eligible for
a funded place from:
Type of place:
16 August 2017 and
28 February 2018
16 August 2022 Deferred Entry
Page 145

Page 146

1 March 2018 and
28 February 2019
16 August 2022 Pre-school
1 March 2019 and
31 August 2019
16 August 2022 Ante pre-school
1 September 2019 and
31 December 2019
9 January 2023 Ante pre-school
1 January 2020 and
29 February 2020
17 April 2023 Ante pre-school 
2.5 Eligibility for 2 year old funded childcare is dependent on criteria relating to
parents/carers receiving qualifying benefits such as income support, income-
based job seekers allowance etc. This also includes children that are looked
after, under a kinship care order or under a guardianship order. Once the child
becomes eligible and takes up their place, they stay entitled to a place even if
their parent's circumstances change (for example, if they no longer receive
one of the qualifying benefits); however, parents must re-apply for their child’s
place as a 3 year old. 
2.6 Registration for a 2 year old placement requires parents/carers to complete a
registration form available to download from Moray Council’s website or by
contacting the ELC administration team to receive a hard copy of the form by
post. Eligibility is then confirmed by the ELC administration team. It is the
responsibility of the parent to contact the provider they wish to use once their
eligibility has been confirmed. 
2.7 Parents of 3-4 year old children are able to register during a two week period
via an online application process in January for the following academic year
that begins in August. For those families unable to utilise online registration,
they are able to contact the ELC administration team by email or phone to
receive a hard copy of the registration form or alternatively, they can request a
hard copy from their nursery of choice. 
2.8 Parents may choose to defer entry to primary school and elect to have their
child attend nursery for one additional year if their child’s 5th birthday falls
between start of term in August and the end of February of the following year. 
2.9 Parents of funded 3 and 4 year olds are asked to select up to three ELC
provider settings in order of preference with the option to have their funded
entitlement split between 2 providers. Where possible parents are awarded a
place at their first choice, but as there are a limited number of places in each
setting this is not always achievable. This is particularly the case for those
children that do not start their funded place until January or April due to their
date of birth. 
2.10 Funded childcare places are allocated with priority given as follows: 
• Child with existing attendance in the nursery
• Child resident in secondary catchment area and sibling in the nursery
• Child resident in secondary catchment
• Child with Co-ordinated Support Plan (CSP), and/or assessment by the
Education Authority
• Child outwith secondary catchment area and sibling in the nursery
Page 146

Page 147

• Child outwith the secondary catchment area 
Priority within any of the six categories above, where it is necessary to be
determined, will be given to older children first and then to those resident
closest to the setting (distance being calculated by the straight line method). 
2.11 All registration records for nursery children are maintained on the operating
system known as the Nursery Application Management System (NAMS)
which allows projected figures to be extracted in advance of each scheduled
intake period in August, January and April. 
2.12 The current forecasted figures extracted from NAMS indicate that demand for
ELC funded places for August 2022 will be accommodated within each ASG
area. Further details are noted within Appendix 1. 
2.13 The NAMS figures for August 2022 do not include uplifts for January and April
intakes of children in the 2-3 age group that will turn 3 and become eligible for
funded childcare throughout the year. As a comparison, in August 2021 the
projected nursery enrolment was 1,314 children between ages 3-5 which then
increased to 1,848 children by April 2022. This takes account of families
accessing any level of funded hours. 
2.14 Nursery age population figures based on CHI data from 2021, project that the
population for this age group will continue to be similar each subsequent year
from 2022-2024. This indicates that we will be able to continue meeting the
demand for ELC funded places in the immediate future. Additional information
is broken down within Appendix 1 by each ASG area. 
2.15 It is important to note that the projected population figures only provide the
potential number of children that are eligible for funded early learning and
childcare and do not reflect how many parents/carers will choose to take up
their entitlement of 1140 hours or any part thereof. 
3. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)
The report links to the priority of working towards a financially stable
Council that provides valued services to our Communities and providing
a sustainable education service aiming for excellence as referred to in
the Moray Council Corporate Plan. 
The report links to ‘Building a better future for our children and young
people in Moray’ from the LOIP. 
(b) Policy and Legal
The Care Inspectorate inspects all registered services regulated under
the Public Services Reform (Scotland) Act 2010, which includes nursery
classes and playgroups. 
Page 147

Page 148

Local authorities have a statutory legislative requirement to provide 1140
hours of funded early learning and childcare hours to all 3-4 year olds
and eligible 2 year old children. 
(c) Financial implications
As providing 1140 hours of funded early learning and childcare is a
statutory legislative requirement, there will ongoing financial implications
for Moray Council in regards to ensuring all eligible children and families
have access to this service. 
There are no further financial implications arising directly from this report. 
(d) Risk Implications
There are no risk implications arising directly from this report. 
(e) Staffing Implications
There are no staff implications arising directly from this report. 
(f) Property
There are no property implications arising directly from this report. 
(g) Equalities/Socio Economic Impact
There is no requirement for an equality impact or socio economic impact
assessment to be carried out. 
(h) Climate Change and Biodiversity Impacts
There are no climate change or biodiversity impacts arising directly from
this report. 
(i) Consultations
Depute Chief Executive, Head of Education (Chief Education Officer),
Early Years Service Manager, Susan Walker, Business Support
Administrator and Tracey Sutherland, Committee Services Officer have
been consulted. 
4. CONCLUSION 
4.1 Committee is asked to note the registration process for funded early
learning and childcare hours. 
4.2 Committee is asked to note the current demand for ELC places within
Moray and projected population by each ASG area. 
4.3 Committee is asked to note the capacity for funded ELC places within
Moray. 
Author of Report: Jennie Ordonez, Early Years Project Officer 
Background Papers: N/A
Ref: SPMAN-1315769894-317 / SPMAN-1315769894-318
Page 148

Page 149

Provider Name Associated School
Group (ASG)
Partner Provider/Local
Authority
Current
Registration
August 22 *
Care
Inspectorate
(CI)
Registered
Capacity **
Registered to
offer funded 2
year olds places
Service Model *** Notes
Cullen Primary School Nursery Buckie Local Authority 18 56 Yes 46 week and 50 week
Findochty Primary School Nursery Buckie Local Authority 14 20 No Term time
Lady Cathcart Nursery Buckie Local Authority 34 50 Yes 46 week and 50 week
Millbank Nursery Buckie Local Authority 31 40 No Term time
Portessie Playgroup Buckie Partner Provider 16 26 Yes Term time
Portgordon Primary School Nursery Buckie Local Authority 6 20 No Term time
Portknockie Nursery Buckie Partner Provider 13 20 Yes Term time
Rainbow Days Buckie Partner Provider 30 34 Yes Term time
St. Peter's RC Primary School Nursery Buckie Local Authority 39 40 No Term time
Total Buckie ASG 201 306
Bishopmill Pre-school Centre Elgin Academy Partner Provider 32 40 Yes Term time
Curious Minds Education Centre Elgin Academy Partner Provider 47 40 Yes Term time
Earthtime Elgin Forest School Nursery Elgin Academy Partner Provider 14 16 No 46 week
East End School Nursery Elgin Academy Local Authority 14 20 No Term time
Liberty Kids Elgin Academy Partner Provider 35 95 Yes Term time
Rainbow Castle Childcare Elgin Academy Partner Provider 27 85 Yes Term time
Seafield Primary School Nursery Elgin Academy Local Authority 49 40 No 46 week and 50 week
St. Sylvester's Nursery Elgin Academy Partner Provider 15 44 Yes Term time
Stramash Outdoor Nursery, Elgin Elgin Academy Partner Provider 38 42 Yes Term time and 50 week
The College Nursery Elgin Academy Partner Provider 23 60 Yes Term time
V.I.P. Childcare - Moray Elgin Academy Partner Provider 33 67 Yes Term time and 50 week
Total Elgin Academy ASG 327 549
Ark Childcare Ltd Elgin High Partner Provider 36 90 Yes Term time and 50 week
Jack and Jill Nursery School Elgin High Partner Provider 29 60 Yes Term time
Linkwood Nursery Elgin High Local Authority 46 56 No 46 week and 50 week
Magic Roundabout Childcare Centre Elgin High Partner Provider 27 40 No Term time
Magic Roundabout Childcare Centre Elgin High Partner Provider 58 86 Yes 46 week 
Miltonduff Pre-school Group Elgin High Partner Provider 13 26 Yes Term time
New Elgin Primary School Nursery Elgin High Local Authority 21 24 No Term time
Total Elgin High ASG 230 382
Drumduan School Forres Partner Provider 12 38 No Term time
Dyke Pre-school Centre Forres Partner Provider 15 20 Yes Term time
Page 149

Page 150

Hop, Skip & Jump Nursery Forres Partner Provider 23 34 Yes Term time
Kinloss Primary School Nursery Forres Local Authority 15 15 No Term time
Noah's Ark Day Care Forres Partner Provider
29
42 Yes Term time
does not operate
at full capacity
due to functional
capacity issues
Pilmuir Primary School Nursery Forres Local Authority 28 60 Yes 46 week and 50 week
Rainbow Childcare and Education Ltd Forres Partner Provider 43 34 Yes 46 week 
Spring Kinloss Forres Partner Provider 29 100 Yes Term time and 46 week
Total Forres ASG 194 343
Flexible Childcare Services Keith Keith Partner Provider 41 63 Yes Term time, 46 and 50 week
Keith Play Centre Nursery & Rising 3's Keith Partner Provider 13 35 Yes Term time and 46 week
Keith Primary School Nursery Keith Local Authority 25 30 No Term time
Newmill Nursery and Little Stars Keith Partner Provider 14 15 Yes Term time
Rothiemay Playgroup Keith Partner Provider 8 12 No Term time
St. Thomas Primary School Nursery Keith Local Authority 12 20 No Term time
Total Keith ASG 113 175
Burghead Primary School Nursery Lossiemouth Local Authority 25 20 No Term time
Earthtime's Forest School Nursery Lossiemouth Partner Provider 28 50 Yes Term time
East Beach Nursery Lossiemouth Partner Provider 27 44 Yes Term time and 50 week
Hopeman Primary School Nursery Lossiemouth Local Authority 14 20 No Term time
Hythehill Primary School Nursery Lossiemouth Local Authority 22 20 No Term time
Ladybird Development Group Lossiemouth Partner Provider 8 15 Yes Term time
Little Learners Lossiemouth Partner Provider 3 34 Yes 50 week
RAF Lossiemouth Childcare Centre Lossiemouth Partner Provider 49 131 Yes Term time and 50 week
St. Gerardine Primary School Nursery Lossiemouth Local Authority
23
40 No Term time
does not operate
at full capacity
due to functional
capacity issues
Total Lossiemouth ASG 199 374
Fochabers Nursery and Out of School Milnes Partner Provider 33 50 Yes Term time
Garmouth & Kingston Pre-School Group Milnes Partner Provider 6 40 Yes Term time
Lhanbryde Primary School Nursery Milnes Local Authority 20 48 Yes 46 week and 50 week
Milne's Primary School Nursery Milnes Local Authority 9 24 No Term time
Mosstodloch Early Learning & Childcare Milnes Partner Provider 28 32 No Term time
Page 150

Page 151

Total Milnes ASG 96 194
Aberlour and Craigellachie Pre School Speyside Partner Provider 19 24 Yes Term time
Aberlour Primary Nursery School Speyside Local Authority 12 20 No Term time
Busy Bee's Childcare Speyside Partner Provider 9 16 Yes 50 week
Knockando Playgroup Speyside Partner Provider 13 14 No Term time
Mortlach Primary School Nursery Speyside Local Authority 7 15 No Term time
Rothes Primary School Nursery Speyside Local Authority 16 17 No Term time
The Cabin Speyside Partner Provider 11 24 Yes Term time
Tomintoul Primary School Nursery Speyside Local Authority 8 20 No Term time
Total Speyside ASG 95 150
Total Moray 1455 2473
In addition to current registration of 1455 children, there are an additional 36 children receiving funded hours from August 2022 with childminders throughout Moray.
*Please note current registration figures do not include January and April intake children.
*** Settings which operate on a 46 week or 50 week model are able to provide up to 2 sessions per day so registered capacity has potential to double number of children served.
** Capacity figures do not take into account non-funded places for children at partner provider settings as these are not held in the NAMS system which records funded
childcare places only. Some partner provider nurseries are registered with Care Inspectorate to provide service to children from varying ages ranging from birth through 14
years of age; therefore, a registered capacity does not indicate all places will be for funded 3-4 year olds and eligible 2 year olds.
Page 151

Page 152

Nursery Population Forecasts 2022- Based on
CHI data from 2021
ASG 1-2 2-3 3-4 4-5 Total 3-5s
Buckie High 128 145 110 136 246
Elgin Academy 148 150 142 151 293
Elgin High 149 143 137 133 270
Forres Academy 132 139 148 122 270
Keith Grammar 66 62 69 80 149
Lossiemouth High 99 103 109 116 225
Milne's High 63 66 71 73 144
Speyside High 53 67 62 69 131
Total 838 875 848 880 1728
Nursery Population Forecasts 2024- Based on
CHI data from 2021
ASG 3-4 4-5 Total 3-5s
Buckie High 128 145 273
Elgin Academy 148 150 298
Elgin High 149 143 292
Forres Academy 132 139 271
Keith Grammar 66 62 128
Lossiemouth High 99 103 202
Milne's High 63 66 129
Speyside High 53 67 120
Total 838 875 1713
CHI Data
CHI Data
Page 152

Page 153

Nursery  Population Forecasts 2023- Based on
CHI data from 2021
ASG 2-3 3-4 4-5 Total 3-5s
Buckie High 128 145 110 255
Elgin Academy 148 150 142 292
Elgin High 149 143 137 280
Forres Academy 132 139 148 287
Keith Grammar 66 62 69 131
Lossiemouth High 99 103 109 212
Milne's High 63 66 71 137
Speyside High 53 67 62 129
Total 838 875 848 1723
CHI Data
Page 153

Page 154

Page 154

Page 155

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE 24 AUGUST 2022 
SUBJECT: INFORMATION REPORT: SINGLETON INSPECTIONS OF EARLY
LEARNING AND CHILDCARE CENTRES – PUBLISHED
REPORTS MARCH 2022 TO JUNE 2022 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the content of singleton inspection reports of Early
Learning and Childcare (ELC) centres by Care Inspectorate which were
published between March 2022 and June 2022. These were: 
Linkwood Nursery, Elgin 
Portgordon Nursery, Portgordon 
Rainbow Days Nursery, Buckie 
Aberlour & Craigellachie Pre School, Aberlour 
Mosstodloch Nursery, Mosstodloch
Pilmuir Nursery, Forres 
1.2 This report is submitted to Committee in terms of Section III (D) (1) of the
Council's Scheme of Administration relating to exercising the functions of the
Council as an Education Authority. 
2. BACKGROUND 
2.1 The Care Inspectorate carries out inspections of care services, including day
care of children’s services. Providers are inspected against a Framework of
Quality Themes and Statements and the National Standard. 
2.2 The Care Inspectorate resumed face to face ELC scrutiny in Autumn 2021
after COVID-19 restrictions impacted on their work. 
2.3 The six services noted are the last to have scrutiny under the old quality
framework and subsequently have reports finalised and published. 
2.4 Until end of June 2022, Care Inspectorate Officers graded services and
published these grades as part of their duty to provide information to the
public about the quality of care services. 
Page 155

Page 156

The six point grading scale: 
6 excellent
5 very good
4 good
3 adequate
2       weak
1 unsatisfactory 
2.5 Following publication, inspection reports are available through ELC centres
and online at www.careinspectorate.com. 
2.6 The education authority will give guidance and support, as appropriate, to
both school nursery settings and partner providers of ELC education.
Following a Singleton Inspection, the ELC centre is asked to prepare an
action plan indicating how they will address the main findings of the report and
to share the plan with parents and carers. 
2.7 During this reporting period there were 6 Singleton Inspection reports
received. 
Name of Early Learning and Childcare Provider Date of Inspection
Linkwood Nursery, Elgin 18 March 2022
Portgordon Nursery, Portgordon 30 March 2022
Rainbow Days, Buckie 26 April 2022
Aberlour & Craigellachie Pre School, Aberlour 5 May 2022
Mosstodloch Nursery, Mosstodloch 23 May 2022
Pilmuir Nursery, Forres 8 June 2022 
2.8 The Gradings, Recommendations and Requirements arising from the reports
are summarised in Appendix 1. 
2.9 Linkwood, Mosstodloch and Pilmuir received grades 4 or above which means
they are meeting the National Standard. 
2.10 These services continue to work in partnership with Moray Council and have
access to the Early Years Teaching Team alongside their respective
Continuous Improvement Officer. 
2.11 Portgordon, Rainbow Days and Aberlour and Craigellachie Pre-School all
dropped below grade 4 in one area of their inspection. Recommendations are
summarised in Appendix 1.
Page 156

Page 157

2.12 The table below highlights the area where the grade has dropped and the
planned improvement work to support ELC settings; 
ELC setting Quality Framework area Plans for
improvement/support
Portgordon Nursery Quality of Management and
Leadership
Recruitment of new
nursery manager.
Ongoing support from
Continuous
Improvement Officer
(East)
Minor works planned
for 2023 will enhance
open ended play
opportunities.
Rainbow Days Quality of Management and
Leadership
Safer recruitment
practices developed. 
Aberlour &
Craigellachie Pre-
school
Quality of Environment Support from
Continuous
Improvement Officer
(East) with environment
audit.
Capital works planned
for 2023 which will
enhance environment. 
2.13 Each of the services is in the East of Moray and will receive continued support
from Teaching and Learning Teachers as well as the support noted above.
Portgordon Nursery has a new nursery manager that will start on 5th
September therefore meeting one of the outstanding requirements. 
2.14 The current gradings of these three services will not impact on their
partnership agreement with Moray Council to deliver funded Early Learning
and Childcare hours. 
3. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
This report relates the priority ‘Provide a sustainable education service
aiming for excellence’ from the Corporate Plan and to ‘Building a better
future for our children and young people in Moray’ from the LOIP. 
(b) Policy and Legal
The Care Inspectorate inspects all registered services regulated under
the Public Services Reform (Scotland) Act 2010, which includes nursery
classes and playgroups. 
The authority has a duty to provide a quality early learning and childcare
place for every 3 and 4 year old whose parents wish it and for eligible 2
year olds.
Page 157

Page 158

(c) Financial implications
None arising directly from the report. 
(d) Risk Implications
None arising directly from the report. 
(e) Staffing Implications
None arising directly from the report. 
(f) Property
None arising directly from the report. 
(g) Equalities/Socio Economic Impact
An Equality Impact Assessment is not required as this report is to inform
Committee on performance. 
(h) Climate Change and Biodiversity Impacts
None arising directly from the report. 
(i) Consultations
Head of Education (Chief Education Officer), Continuous Improvement
Officer (West), Continuous Improvement Officer (East), Early Years
Project Officer and Principal Teacher Early Years Education Service
have been consulted and are in agreement with the contents of this
report as regards their respective responsibilities. 
4. CONCLUSION 
4.1 That the Committee scrutinise and note the contents of this report. 
Author of Report:  Hazel Sly, Early Years’ Service Manager
Background Papers:
https://www.careinspectorate.com/berengCareservices/ht
ml/reports/getPdfBlob.php?id=309996 
https://www.careinspectorate.com/berengCareservices/ht
ml/reports/getPdfBlob.php?id=309979 
https://www.careinspectorate.com/berengCareservices/ht
ml/reports/getPdfBlob.php?id=310259 
https://www.careinspectorate.com/berengCareservices/ht
ml/reports/getPdfBlob.php?id=310617 
Ref: SPMAN-1315769894-315 / SPMAN-1315769894-316
Page 158

Page 159

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 24 AUGUST 2022 
SUBJECT: INFORMATION REPORT: EARLY LEARNING AND CHILDCARE –
MAJOR AND MINOR INFRASTRUCTURE WORKS UPDATE 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of plans for Early Learning and Childcare (ELC)
major and minor infrastructure works in 2022 and 2023. 
1.2 To inform the Committee of capital spend budget plans approved by Council
on 29 June 2022 which include completion of infrastructure works for
identified local authority nursery settings. 
1.3 This report is submitted to Committee in terms of Section III (D) (1) of the
Council's Scheme of Administration relating to all the functions of the Council
as an Education Authority. 
2. BACKGROUND 
2.1 Since August 2018, Moray Council’s Early Learning and Childcare (ELC) team
has been preparing for the expansion of funded ELC hours to increase from
600 to 1140. This expansion was originally scheduled to be completed by
August 2020; however, due to the pandemic this was delayed by the Scottish
Government until August 2021. 
2.2 As part of the expansion programme, four new build nurseries have been
constructed throughout various Associated School Group (ASG) areas in
Moray including: 
• Strathisla Children’s Centre - Keith ASG
• Pilmuir Primary School Nursery - Forres ASG 
• Cullen Primary School Nursery - Buckie ASG 
• Linkwood Primary School Nursery - Elgin High ASG 
Page 159

Page 160

2.3 In addition to new build facilities, six major refurbishments and three minor
refurbishments of existing spaces were carried out including works at: 
• Lady Cathcart Centre – Buckie ASG
• Burghead Primary School Nursery – Lossiemouth ASG
• Lhanbryde Primary School Nursery – Milnes ASG
• Mortlach Primary School Nursery – Speyside ASG
• Mosstodloch ELC Centre at Mosstodloch Primary School – Milnes ASG
• New Elgin Primary School Nursery – Elgin High ASG
• St Thomas Primary School Nursery – Keith ASG
• Hythehill Primary School Nursery – Lossiemouth ASG
• Kinloss Primary School Nursery – Forres ASG 
2.4 One major refurbishment project remains outstanding at Aberlour Primary
School which includes setting up one outdoor nursery space and siting one
temporary bespoke nursery unit to serve as decant spaces during the
refurbishment process. Following completion of works, both Aberlour Primary
School Nursery (local authority operated) and Aberlour & Craigellachie Pre-
School Nursery (partner provider operated) will return to the facilities in line
with current operating arrangements. 
2.5 Additionally, five minor refurbishment projects remain outstanding at Kinloss
Primary School Nursery (Forres ASG), Findochty Primary School Nursery
(Buckie ASG), Portgordon Primary School Nursery (Buckie ASG), St Peters
Primary School Nursery (Buckie ASG) and Rothes Primary School Nursery
(Speyside ASG). 
2.6 The minor works at Kinloss Primary School Nursery were planned in 3 phases
to allow works to be carried out during school holiday periods. Phase 1 and 2
are now complete and included upgrades to the toilets, kitchen and playroom
areas. Phase 3 remains outstanding and will include re-location of one
primary school classroom door out with the nursery area and the installation of
a fob security system on nursery doors. 
2.7 Delays were encountered in these remaining projects as a result of COVID-19
and ELC budget pressures. 
2.8 Identified works were based on meeting National Standards and Care
Inspectorate requirements and are essential in order to ensure facilities
remain operational and thereby meet the capacity for current and future
demand of funded ELC places within respective ASG areas. Local authorities
have a statutory legislative requirement to provide 1140 hours of funded early
learning and childcare to all 3-4 year olds and eligible 2 year olds as
mandated by the Scottish Government. 
2.9 A summary of recent Care Inspectorate inspection results can be found in the
corresponding information report: Singleton Inspections of Early Learning and
Childcare Centres – Published Reports March 2022 to June 2022. This report
includes 2 settings which are part of the planned works, Portgordon Primary
School Nursery and Aberlour & Craigellachie Pre-School Nursery. These
settings both received lowered grades in areas which will be addressed as
part of the works programme.
Page 160

Page 161

2.10 3 minute briefs and project mandates were completed for the above noted
outstanding projects and submitted to the ELC Programme Board, Asset
Management Working Group and Corporate Management Team (CMT) for
consideration. Following these submissions, it was recommended that a
request to complete infrastructure works for identified local authority nursery
settings be included in the capital spend budget plans for review by Moray
Council on 29 June 2022. 
2.11 It was agreed at Moray Council on 29 June 2022 (para 22 of the minute
refers) to include in capital budget plans: 
• £900,000 – Aberlour Primary School project for the 2 associated nurseries 
• £20,000 – Kinloss Primary School Nursery project
• £92,000 – Findochty Primary School Nursery project 
• £110,000 – Portgordon Primary School Nursery project 
• £137,000 – St Peters Primary School Nursery project 
• £131,000 – Rothes Primary School Nursery project. 
2.12 Above figures were provided by the Quantity Surveying (QS) team and are
subject to fluctuation depending on the timeline for works to be completed
which may impact on overall budget due to inflationary costs of building
materials. The QS team will provide updated figures and any changes to
original costings will be submitted at the meeting of Moray Council on 7
December 2022 for review of the capital plan. 
2.13 A proposed timeline for the completion of the above noted projects is as
follows: 
Nursery Planned works Proposed timeline
Kinloss Primary
School Nursery
Fob system to be
installed on nursery
doors connected to
primary school and
nursery exit door
leading to outdoor play
area; door leading into
primary school
classroom to be
relocated outwith
nursery area 
Potentially summer
2022 holidays if
Morrisons can include
as part of heating
upgrade works,
otherwise October 2022
holidays
Findochty Primary
School Nursery
Kitchen refurb/existing
nursery toilets to be re-
configured to include
private nappy changing
space (if possible
replacement of flooring
to be included) 
October 2022 holidays
with option to extend
toilet works during out of
school hours until
completed – nursery
would use PS toilets in
the interim
Page 161

Page 162

Nursery Planned works Proposed timeline
Portgordon Primary
School Nursery
Fob system to be
installed on nursery exit
doors; kitchen
refurb/existing nursery
toilets re-configured to
include private nappy
changing space
Fob works can be put
through help desk as
soon as possible and
carried out after hours if
required; kitchen/toilet
works potentially
October 2022 or Easter
2023
Rothes Primary
School Nursery
Kitchen refurb/re-
configure disabled toilet
area to include nappy
changing space
Easter 2023 holidays for
kitchen refurb and
summer 2023 holidays
for toilet reconfiguration
St Peters Primary
School Nursery
Kitchen refurb/addition
of nursery & staff toilets
including private nappy
changing space (if
possible replacement of
flooring to be included)
Summer 2023 holidays
Aberlour Primary
School
Nursery/Aberlour and
Craigellachie Pre-
School Nursery at
Aberlour Primary
School
Siting of 1 temporary
unit at Aberlour
PS/decanting of partner
nursery in temporary
unit/decanting of local
authority nursery to
outdoor space/major
refurbishment of existing
premises with both
nurseries returning
following completion of
works
-October 2022 drainage
works
-Temporary unit to be in
placed following Easter
holidays 2023/outdoor
nursery decant to be in
place following Easter
holidays 2023
-Refurbishment works to
begin following Easter
holidays 2023 for
approximately 4 months 
The proposed timeline is dependent on availability of DLO and external
contractors. Head teachers and nursery managers will be kept informed of
proposed works and timelines in order to ensure transparency at each stage
and allow processes to be finalised through open discussion. 
Advice from the Climate Change (CC) team notes that outdoor nursery
provision produces considerably less carbon emissions. The CC team
recommend adding a checkpoint review of the temporary outdoor provision
utilised during the decant period to determine if there would be an opportunity
to continue provision in this way for the local authority operated nursery
setting. 
3. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)
The report links to the priority of working towards a financially stable
Council that provides valued services to our Communities and providing
a sustainable education service aiming for excellence as referred to in
the Moray Council Corporate Plan. 
Page 162

Page 163

The report links to ‘Building a better future for our children and young
people in Moray’ from the LOIP. 
(b) Policy and Legal
The Care Inspectorate inspects all registered services regulated under
the Public Services Reform (Scotland) Act 2010, which includes nursery
classes and playgroups. 
Local authorities have a statutory legislative requirement to provide 1140
hours of funded early learning and childcare hours to all 3-4 year olds
and eligible 2 year old children. 
(c) Financial implications
The estimated costs to complete outstanding major and minor
infrastructure projects are currently expected to be approximately as
follows:
• £900,000 – Aberlour Primary School for Aberlour Primary School
Nursery/Aberlour & Craigellachie Pre-School Nursery
• £20,000 – Kinloss Primary School Nursery
• £92,000 – Findochty Primary School Nursery
• £110,000 – Portgordon Primary School Nursery
• £137,000 – St Peters Primary School Nursery
• £131,000 – Rothes Primary School Nursery 
These estimated costs are subject to change depending on inflationary
costs of building materials and overall timeline of work completion. Any
update to above noted figures will be provided to Education, Children’s
And Leisure Services Committee accordingly and to full Council 7
December 2022 for consideration. 
Investment of capital budget is required in order to meet National
Standards and Care Inspectorate requirements to ensure continued
operation of identified nursery settings in order to meet current and
future demand for capacity of funded early learning and childcare spaces
in respective ASG areas. 
The timeline for works to be completed will be over 2022 and 2023
financial years. If slippage in proposed timeline occurs, works may
extend until 2024 financial year. Where possible, works will be carried
out as soon as possible in order to prevent further uplift in costs related
to inflation and building material cost increases. 
(d) Risk Implications
There is a risk that general inflation and the rise in building material costs
will have an impact on the overall budget estimated for the outstanding
projects to be completed. This would result in the need for additional
capital funding to be requested in order to ensure identified works could
be completed. 
There is also a risk that the proposed timeline for the works will require
to be altered depending on the availability of internal and external
contractors. Furthermore, there is a risk for disruption of service for
Page 163

Page 164

settings in the event scheduled works take longer to complete than
expected. This risk can be mitigated by developing a contingency plan to
run services in an outdoor location on a short-term basis to allow any
slight delays to be addressed. 
There is a risk that Care Inspectorate grades will be negatively affected if
inspections take place before remaining works can be completed. This
has been evidenced at Aberlour Primary School Nursery, Aberlour &
Craigellachie Pre-School Nursery and Portgordon Nursery where grades
from recent inspections have been lowered from previous results. On-
going communication with Care Inspectorate will be maintained
throughout each project’s timeline in an effort to assure Care
Inspectorate plans are in place for National Standards to be met in
identified settings. 
(e) Staffing Implications
The proposed works require staff input from the Early Years team,
Finance, Property (including QS and Design teams) and Estates.
However there are no direct staffing implications. 
(f) Property
The proposed works would have impact on six primary school nursery
locations in Speyside ASG, Buckie ASG and Forres ASG areas. 
(g) Equalities/Socio Economic Impact
There are no implications arising directly from this report, however
equalities impacts and considerations have been taken into account in
previous ELC reports 
(h) Climate Change and Biodiversity Impacts
This proposal has the potential to increase the Council’s carbon emissions
due to the building refurbishments and siting of temporary accommodation
units. However, the option of refurbishment of the existing nurseries
means that the carbon emissions are considerably less than that of any
new build. 
A positive implication is that substantial carbon savings and wider climate
behavioural influence are possible via the provision of outdoor nursery
facilities. It is therefore very important that a review point is included in
plans to enable permanent continuation of this service if successful. 
To address the negative implications, advice on further carbon reduction
measures will be sought if required from the Council’s Climate Change
Team. 
(i) Consultations
Depute Chief Executive, Head of Education (Chief Education Officer),
Property Asset Manager, Chief Financial Officer, Asset Manager
(Commercial Buildings), Principal Climate Change Strategy Officer,
George Gunn, Climate Change Strategy Officer, Early Years’ Service
Manager, and Tracey Sutherland, Committee Services Officer have been
consulted. 
Page 164

Page 165

4. CONCLUSION 
4.1 Committee is asked to note the plans for Early Learning and Childcare
major and minor infrastructure works in 2022 and 2023. 
4.2 Committee is asked to note the investment of capital budget to complete
outstanding ELC major and minor infrastructure works in identified
nursery settings. 
4.3 Committee is asked to note that any changes to original costing
estimates will be submitted at the Moray Council meeting 7 December
2022 for review of the capital plan. 
Author of Report: Jennie Ordonez, Early Years Project Officer 
Background Papers: SPMAN-1293228629-707 / SPMAN-1315769894-315 /
SPMAN-1315769894-316
Ref: SPMAN-1315769894-319 
Page 165

Page 166

Page 166