Education, Children's and Leisure Services Committee 
Wednesday, 08 June 2022 
NOTICE IS HEREBY GIVEN that a Meeting of the Education, Children's and
Leisure Services Committee is to be held at Council Chambers, Council Office,
High Street, Elgin, IV30 1BX on Wednesday, 08 June 2022 at 09:30. 
BUSINESS 
1. Sederunt 
2. Declaration of Group Decisions and Members Interests
*
3. Resolution
Consider, and if so decide, adopt the following resolution:
"That under Section 50A (4) and (5) of the Local Government
(Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Item 19 of business
on the grounds that it involves the likely disclosure of exempt
information of the class described in the relevant Paragraphs of Part 1
of Schedule 7A of the Act.”   
4. Minute of Meeting of 9 March 2022 7 - 12
5. Written Questions ** 
6.* Allocation of Education Funding Update
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
13 - 18
7.* Analysis of Secondary School Leavers Attainment
2020-2021
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
19 - 38
Page 1

Page 2

8.* Moray Education Early Learning and Childcare Income
Generation
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
39 - 48
9.* Q4 2021-22 Performance Report - Education - Period to
March 2022
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
49 - 56
10.* Education Revenue Budget Monitoring to 31 March
2022
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
57 - 64
11.* Instrumental Music Tuition Funding Allocation
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
65 - 76
12.* Education Resources and Communities and Education
Capital Budget Monitoring Report
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
77 - 84
13.* Education Resources and Communities Revenue
Budget Monitoring to 31 March 2022
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
85 - 90
14.* Q4 2021-22 Performance Report - Education Resources
and Communities - Period to March 2022
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
91 - 98
15. Whole Family Wellbeing Fund
Report by Chief Officer, Health and Social Care Moray  
99 -
106
16. Children and Families Social Work Services Revenue
Budget Monitoring to 31 March 2022
Report by Chief Officer, Health and Social Care Moray  
107 -
112
Page 2

Page 3

17. Q4 2021-22 Performance Report - Children and Families
and Criminal Justice Social Work - Period to March
2022
Report by Chief Officer, Health and Social Care Moray  
113 -
122
18. Question Time ***
Consider any oral question on matters delegated to the Committee in
terms of the Council's Scheme of Administration. 
Only items marked * can be considered and determined
by all members of the Committee   
Item(s) which the Committee may wish to consider with
the Press and Public excluded   
19. Early Learning and Childcare - Lease Update and
Proposed Shared Property Costs Methodology [Para 9]
• Information on terms proposed or to be proposed by or to the
Authority; 
Summary of Education, Children's and Leisure Services
Committee
To exercise all the functions of the Council as Education Authority
within the terms of relevant legislation with regard to school education,
nurseries and child care, Gaelic, children’s services, leisure, libraries
and museums, sport and the arts, CLD, life long learning, youth justice
and child protection.         
Any person wishing to attend the meeting should contact customer services
on 01343 563217 prior to the meeting as the number of attendees is restricted
due to the recent Covid pandemic 
You can however watch the webcast of the meeting by going to :
http://www.moray.gov.uk/moray_standard/page_43661.html 
Page 3

Page 4

Page 4

Page 5

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how
the individual or members of the group will vote on any item(s) of business on
the Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any
relevant and competent business within the specified remits not already on the
agenda, to the Chair provided it is received by the Proper Officer or Committee
Services by 12 noon two working days prior to the day of the meeting.  A copy
of any written answer provided by the Chair will be tabled at the start of the
relevant section of the meeting.  The Member who has put the question may,
after the answer has been given, ask one supplementary question directly
related to the subject matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the
consent of the Chair. If a Member does not have the opportunity to put a
supplementary question because no time remains, then he or she can submit it
in writing to the Proper Officer who will arrange for a written answer to be
provided within 7 working days. 
*** Question Time - At each ordinary meeting of the Committee ten minutes will be
allowed for Members questions when any Member of the Committee can put a
question to the Chair on any business within the remit of that Section of the
Committee.  The Member who has put the question may, after the answer has
been given, ask one supplementary question directly related to the subject
matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than ten minutes
after the Committee has started on the relevant item of business, except with
the consent of the Chair.  If a Member does not have the opportunity to put a
supplementary question because no time remains, then he/she can submit it in
writing to the proper officer who will arrange for a written answer to be provided
within seven working days. 
Page 5

Page 6

THE MORAY COUNCIL 
Education, Children's and Leisure Services Committee 
SEDERUNT 
Councillor Kathleen Robertson  (Chair)
Councillor Neil McLennan  (Depute Chair)  
Councillor James  Allan  (Member)
Councillor Neil Cameron  (Member)
Councillor Tracy Colyer  (Member)
Councillor Juli Harris  (Member)
Councillor Sandy Keith  (Member)
Councillor Scott Lawrence  (Member)
Councillor Marc Macrae  (Member)
Councillor Bridget Mustard  (Member)
Councillor Derek Ross  (Member)
Councillor Sonya Warren  (Member)
Councillor Ben Williams  (Member)  
Sheila Brumby  (Non-Voting Member)
Mrs Anne Currie  (Non-Voting Member)
Reverend Tembu Rongong  (Non-Voting Member)
Mrs Susan Slater  (Non-Voting Member)
Ms Angela Stuart  (Non-Voting Member)
Emma Tunnard  (Non-Voting Member)
Clerk Name: Tracey Sutherland
Clerk Telephone: 07971 879268
Clerk Email: tracey.sutherland@moray.gov.uk 
Page 6

Page 7

MORAY COUNCIL 
Minute of Meeting of the Education, Children's and Leisure Services
Committee 
Wednesday, 09 March 2022 
Remote Locations via Video Conference 
PRESENT 
Councillor George Alexander, Councillor James  Allan, Councillor Frank Brown,
Councillor Lorna Creswell, Mrs Anne Currie, Councillor Claire Feaver, Councillor
Graham Leadbitter, Councillor Aaron McLean, Councillor Shona Morrison, Councillor
Derek Ross, Mrs Susan Slater, Ms Angela Stuart, Councillor Amy Taylor, Councillor
Sonya Warren 
APOLOGIES 
Councillor Tim Eagle, Councillor Ryan Edwards, Councillor Laura Powell, Reverend
Tembu Rongong 
IN ATTENDANCE 
Also in attendance at the above meeting were the Depute Chief Executive
(Education, Communities and Organisational Development), Head of Governance,
Strategy and Performance, Head of Education, Head of Education Resources and
Communities, Head of Housing and Property, Design Manager, Head of Internal
Audit, Continuous Improvement Officer (Early Years) and Tracey Sutherland,
Committee Services Officer.   
1.         Chair 
The meeting was chaired by Councillor Sonya Warren.  
2.         Declaration of Group Decisions and Members Interests * 
In terms of Standing Order 20 and the Councillors’ Code of Conduct, there were no
declarations from Group Leaders or Spokespersons in regard to any prior
decisions taken on how Members will vote on any item on the agenda or any
declarations of Member’s interests in respect of any item on the agenda. 
3.         Resolution 
The meeting resolved that in terms of Section 50A (4) and (5) of the Local
Government (Scotland) Act 19973, as amended, the public and media
representatives be excluded from the meeting for Item 13 of business on the
grounds that it involves the likely disclosure of exempt information of the class
described in the relevant Paragraphs of Part 1 of Schedule 7A of the Act.  
Para Number of
the Minute Para Number of Schedule 7a
14 Para 1 and 11
Information relating to Staffing Matters
Item 4.
Page 7

Page 8

and
Information relating to any consultations or negotiations in
connection with any labour relations 
4.         Petition 
The Chair advised the Committee that she had received a petition from Pupils at
Buckie High School, which is supported by senior pupils from the other secondary
schools in the area. The petition had been circulated to all Members of the
Committee prior to the meeting.  
The petition was in regards to the timing of the payment of the free school
payments to senior pupils.  
The Chair confirmed that the pupils had highlighted an important issue and
Officers are currently determining whether a solution can be determined with a
report coming to a future meeting of this Committee.  
The Chair advised that the petition doesn’t currently fall with inthe Council’s
petition process but felt it was important to listen to the young people.  The Chair
confirmed that she had discussed the petition process with the Chair of Corporate
Committee and which he would raise later in the meeting.    
5.         Minutes of meeting - 26 January and 2 February 2022 
The minute of the meetings of Education, Children's and Leisure Services
Committee on 26 January and 2 February 2022 were submitted and approved.  
6.         Written Questions 
The Committee noted that no written questions had been submitted.  
7.         Education Resources and Communities and Education Capital
Budget Monitoring Report 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) informed the Committee of projects and proposed
expenditure for Capital Budgets within Education, Children's and Leisure Services
for 2021/22 and sought approval for the proposed programme of Schools BB
projects for financial year 2022/23.  
Following consideration the Committee agreed to:  
i) note the contents of the report; and    
ii) approve the proposed programme of projects for financial year 2022/23
under the Schools BB budget heading detailed in Appendix II.  
8.         Elgin Community Centre 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) provided the Committee with an update in relation to
Elgin Community Centre (Elgin CC) and asked the Committee to agree to defer a
decision on the future of this facility until the end of 2022.  
Page 8

Page 9

Following consideration the Committee agreed to:  
i) note the information in relation to the current operation of Elgin CC; and    
ii) extend the period for review work on the future of Elgin Community Centre
until the end of 2022.  
9.         Education Resources and Communities Revenue Budget Monitoring
to 31 December 2021 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) informed the Committee of the budget position for
Education Resources and Communities as at 31 December 2021.  
Following consideration the Committee agreed to note the budget position at 31
December 2021.  
10.         Education and Education Resources and Communities Service
Plans 2022-23 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) invited the Committee to consider the Education and
Education Resources and Communities Services' Service Plans for 2022-23.  
Following consideration the Committee agreed to approve the Service Plans for
services within Education (Schools and Early Years) and Education Resources
and Communities. 
11.         Education Revenue Budget Monitoring to 31 December 2021 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) informed the Committee of the budget position for
Education as at 31 December 2021.  
Following consideration the Committee agreed to note the budget position as at 31
December 2021.  
12.         Allocation of Education Funding 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) updated the Committee on allocation of the funding
for Education in the 2022/23 revenue grant settlement, to raise known budget
pressures, the ongoing impact of the Covid-19 pandemic and to ask the
Committee to consider the allocation of the funding taking account of these issues.  
Following consideration, Councillor Warren moved to accept the recommendations
as printed and in relation to recommendations (iv) agree option (d) request 21
additional NQTs across Primary and Secondary.  This was seconded by Councillor
Brown.  
Councillor Alexander sought clarification on what would happen if the Council were
unsuccessful in obtaining a further 21 NQTs.  The Head of Education confirmed
that if the Council did not receive all 21 NQTs requested a report would come back
to Committee for decision on how to spend the remaining money.  
Page 9

Page 10

As there was no one otherwise minded, the Committee agreed to:  
i)  meet the budget pressure relating to school roll increases for primary schools
which has been re-assessed as £533k;    
ii) meet the now known budget pressure in relation to Additional Support Needs
of £1.1m;    
iii) fund the post of Principal Teacher Flexible Education which is a new budget
pressure, at a cost of £63k;    
iv) allocate £220k for the 9 support staff posts allowed for in the additional grant
funding; and     
v) request 21 additional NQTs across Primary and Secondary.  
13.         Question Time *** 
Councillor Ross sought an update on the Ventilation and CO2 Monitoring in
Schools and Nurseries report which he had requested at the previous meeting of
the Committee.  
In response, the Head of Education Resources and Communities confirmed that
the report had been included as an Information Report on this meetings Additional
Meeting Documents section.  
The Programme Manager (Learning Estate) joined the meeting at this juncture and
gave a brief verbal update on the Ventilation Programme.  
Councillor A McLean, as Chair of Corporate Committee acknowledged, the
previously raised issue around petitions from our pupils and that there is currently
no process for dealing with these.  He confirmed that the Head of Governance,
Strategy and Performance is currently reviewing the Petitions Policy and sought
confirmation that this will include petitions from young people.  
In response, the Depute Chief Executive (Education, Communities and
Organisational Development) confirmed that this is a piece of work being carried
out and that other avenues would also be explored to make sure there are a range
of appropriate places that children and young people can be heard. 
Councillor Feaver sought clarification from the Chair on why performance reports
were included as Additional Meeting Documents rather than being included on the
main agenda for the meeting to allow scrutiny.  
In response, the Chair confirmed that where reports (with the exception of
performance and budget reports) are for considering and noting they are additional
meeting documents.  She further added that there is a process for members to call
in these reports to the next meeting, as had been done by Councillor Feaver at the
previous meeting of this Committee, should they have any concerns about the
reports.  The reason for this process is to better manage the Committee time.  
The Depute Chief Executive (Education, Communities and Organisational
Development) further confirmed the rationale described by the Chair, which had
been agreed by the Council and is followed through by this and other service
Committees.  
Page 10

Page 11

This was as part of the Governance Review.  Reports come forward as Information
Reports in order to make the most effective use of Committee time .    
The reports are available to members of the public and members and can be
called in, if there is an issue which requires debate and a decision.  
The Depute Chief Executive (Education, Communities and Organisational
Development) for clarity confirmed that the reports Councillor Feaver was referring
to are inspection reports that have been carried out by Education Scotland and not
routine Performance Reports which are brought to Council and Committees as part
of the Council’s performance management framework.  
14.         Moray Early Learning and Childcare Service Delivery [Para 1 and 11] 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) informed the Committee of the suggested
approaches to contain costs within Early Learning and Childcare (ELC) whilst
continuing to support growing demand.  
During consideration the Chair sought agreement in terms of Standing Order 80, to
suspend Standing Order 75 in order to conclude the meeting past 12.45pm.  This
was unanimously agreed.  
Following lengthy consideration Councillor Alexander moved the recommendations
as printed and with regards to recommendation (v) agreed to pursue
the appointment of an external consultant to undertake a complete review of the
service and structure and to seek the budget from Council.  This was seconded by
Councillor Warren.  
Councillor Feaver sought the inclusion of the scope of work to be carried out by the
consultant be included in the report to Council.  In response, the Depute Chief
Executive (Education, Communities and Organisational Development) confirmed
that the scope would be included in the report.  
As there was no one otherwise minded the Committee agreed to:  
i)  the proposed initial measures to contain escalating ELC costs notably option
2 on Appendix 1 and option 2 on Appendix 2; 
ii) note the outcome of the Internal Audit investigation;    
iii) notes that work undertaken to date to identify savings has amounted to £175k
and that this is insufficient to bring the service within budget;    
iv) a trial period for a limited number of local authority ELC services to offer top
up hours to generate income; and     
v)
pursue the appointment of an external consultant to undertake a complete
review of the service and structure and to report to the Council to seek budget
for this.         
Page 11

Page 12

Page 12

Page 13

REPORT TO: EDUCATION CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 8 JUNE 2022 
SUBJECT: ALLOCATION OF EDUCATION FUNDING (UPDATE) 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To update the Committee on progress with agreed action from this Committee
on 9 March 2022 (para 12 of the minute refers) with regards to the Allocation
of Education Funding. 
1.2 This report is submitted to Committee in terms of Section III (D) (1) of the
Council's Scheme of Administration relating to all the functions of the Council
as an Education Authority. 
2. RECOMMENDATION 
2.1 It is recommended that Committee:- 
i) considers and notes the allocation of Newly Qualified Teachers
(NQTs) to date including additional offer from Scottish Government: 
ii) agrees that any secondary subject vacancies arising due to NQTs not
taking up a place in Moray, are advertised as maingrade teaching
posts on a temporary basis as set out in para 3.9 this report as soon
as possible after this Committee so that appointments can be made
in time for the new school term in August. 
3. BACKGROUND 
3.1 A report was presented to this Committee on 26 January 2022, (para 14 of the 
minute refers) providing detail of additional education funding and options for 
spend as laid down in the recommendations of the report.  
Item 6.*
Page 13

Page 14

3.2  A further report was presented to this Committee on 9 March 2022, (para of 
the minute refers) to update Committee on the allocation of funding for 
Education in the 2022/23 revenue grant settlement from Scottish 
Government.  The paper included the raising of known budget pressures,  the 
ongoing impact of the Covid-19 pandemic and asked Committee to consider 
the allocation of the funding, taking account of these issues.   
3.3 A number of options were discussed by Committee and it was agreed to
request additional 21 NQTs across Primary and Secondary and officers were
instructed to do this along with the annual return to Scottish Government. 
This was broken down to 13 secondary NQTs and 8 primary NQTs. 
3.4 The normal annual staffing exercise was undertaken by officers in order to
complete the return.  Head Teachers in Primary identified where they were
requesting NQTs for any staffing vacancies or using their devolved powers
within the Devolved Management Scheme (DSM) for example to cover the
class commitment of a senior leader where there is budget to do so. 
3.5 In addition to this, officers worked with Secondary Head Teachers to identify
subjects where there were vacancies from August 2022. 
3.6 Within the annual return to Scottish Government on the 18 March 2022, where
the formal request for vacancies were noted, 13 secondary NQTs were
requested in identified subject areas and 8 primary NQTs over and above the
normal request for newly qualified teachers to fill vacancies in schools. The
total number of NQTs therefore requested for session 2022-23 was 36
Primary and 18 Secondary. Within the secondary return, individual subject
requests are noted. 
3.7 Scottish Government have given authorities an early indication of how
successful these requests have been in a report received on the 13 April
2022. To date we are aware that we have not been successful in gaining an
NQT in all secondary subjects requested, leading to challenging staffing
situations in some secondary schools where timetables and subject choices
cannot yet be confirmed. 
3.8 Officers will start to confirm placements once offers are made to students. 
This occurs over the course of the month of May once allocation letters are
sent out.  There are always risks once this happens which include: 
• The student teacher failing their degree or post graduate certificate
• The student not wishing to take a place in Moray
• The student deciding to take the alternative route which is not a
mentored NQT experience in a school (this often happens when they
have family commitments and wish to work closer to home)
• Any other reasons personal to the NQT
• Some NQTs may also withdraw from the scheme once they have
started in post 
Page 14

Page 15

3.9 In order that schools can be fully staffed in August it is essential that the
service can advertise posts as soon as they arise once a vacancy as a result
of an NQT not taking up their place in Moray is known.  Subsequent
information has been received from Scottish Government and early
indications of those NQTs who will not be coming to Moray for reasons
detailed in para 3.8 above.  At the time this report was finalised the up-to-date
position is that 7 of the 13 subject secondary NQTs will not be coming and so
these posts will have to be advertised in order for secondary timetables to run
in August.  The differential in cost between an NQT and teacher appointed will
be subsumed by the school Devolved School Management (DSM) budget. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
This report was informed by the priorities within the Corporate Plan and
10 Year Plan and in particular to Our People, Building a better future for
our children and young people in Moray. 
(b) Policy and Legal
There are no legal implications arising directly from this report. 
(c) Financial implications
The financial figures presented in previous reports did not include any
pay awards for this year.  Teacher pay awards have now been agreed 
and will cost an additional £12,000, this can be funded from the current
budget allocation.  However if an additional NQT is filling a vacancy and
the NQT withdraws for any reason, they would need to be replaced by a
main grade teacher at an additional cost of £29,750 per position.  In
order to accommodate this change, the number of posts to be recruited
to would be reduced to ensure that the overall spend remains within
budget.  As an indication, the budget for an NQT would fund
approximately 0.75 fte of a maingrade teacher depending upon the
placing on the salary scale.The maximum differential between an NQT
and a top of the scale teacher is £29,750 with on costs.  Any deficit in
budget will be charged to DSM. 
(d) Risk Implications
The issues being observed and experienced during the covid pandemic
have been summarised in previous reports to this Committee.  There are
risks that these impacts cannot be fully addressed as a result of the
ongoing pandemic and of restrictions on the budget and human
resources available.  Raising attainment is a key priority of the Council,
however available monies will not provide the capacity or ability to
pursue or continue efforts to date to raise standards in all of our schools. 
Additional monies were received to provide additional staffing to schools
however staff absence has been an issue and continues to have an
impact across schools.  Failure to secure the number of NQTs required
puts an additional strain on school staffing, particularly if these vacancies
were for particular subject areas or to fill known vacancies.
Page 15

Page 16

There is also a risk that as the funding for teaching and support roles
continues to increase nationally that demand for employees outstrips
supply.  The Education and Human Resources services will work
together to develop and update a workforce plan to ensure effective
arrangements and monitoring are in place to manage this risk. There is a
national informal agreement that all teaching posts for session 2022/23
are advertised on 18 February and so there may be a risk that the
current NQTs already have a full-time permanent posts in Moray or
elsewhere.   
In addition, due to the rural location of Moray, many NQTs, once
allocated a post, decide not to take this up which adds additional risk and
pressure to fill vacancies when posts elsewhere in Scotland have been
advertised and filled.  Being able to advertise posts as soon as we know
there is a vacancy is a key mitigation to support schools and the
Education service.   
Furthermore if staff absences,  either Covid related or for other reasons,
continue over session 2022/23, we may have a shortage of staff and this
will impact on the continuity of learning for pupils and may result in
classes or year groups being sent home for remote learning or, and
particularly in secondary, not having access to a subject specialist. 
With the previous Committee decision taken that posts should not be
permanent in order to provide flexibility to meet future budget pressures,
we will not meet the Scottish Government commitment to increase the
number of permanent teacher posts in Moray.  Committee should also
be aware that with class contact time due to reduce in future, that we
may be at risk of not having enough staff to mee this manifesto
commitment. 
A further risk has been identified if any of the 7 posts cannot be filled in
August then supply cover will be required which may not be in the
specific subject area and so this will impact negatively on pupil
experience, and learning and teaching in that particular subject which will
impact on workload for the Principal Teacher and potentially other staff in
the department as well as this could impact on pupil attainment. 
(e) Staffing Implications
The budget pressures set out in the paper would require the recruitment
of additional teaching staff from August 2022.  A number of staff are
currently employed on a temporary contract basis due to previous covid
funding and these arrangements will come to an end in June 2022. With
the decision to request additional NQTs, we were unable to offer
permanent posts to the current year’s NQTs and so they may now have
achieved posts elsewhere.  However, if not, this could have a positive
impact on our supply lists where we may have additional teachers
applying to be on the list.   
(f) Property
There are no property issues arising from this report.
Page 16

Page 17

(g) Equalities/Socio Economic Impact
There are no implications arising directly from this report, however,
equalities impacts and considerations have been taken into account in
the previous deployment of resources to support the covid impacts and
would be factored into any development of options directed by the
committee beyond the budget pressures set out. 
(h) Climate Change and Biodiversity Impacts
None 
(i) Consultations
The Head of Education Resources and Communities, the Head of
Financial Services, Head of HR, ICT and OD, Quality Improvement
Manager, the Business Support Team Manager, and Tracey Sutherland,
Committee Services Officer, have been consulted on this report and
agree with the sections of the report relating to their areas of
responsibility. 
5. CONCLUSION 
5.1 This paper updates Committee on the current position with regards to
NQTs in Moray and officers seek approval to advertise and fill any posts
where vacancies arise due to an NQT not taking up an allocated post in
Moray for reasons identified within the report. 
Author of Report: Vivienne Cross, Head of Education
Background Papers: ECLS Committee 09 March 2022 (Item 11) 
ECLS Committee 26 January 2022 (Item 8a)
Ref: SPMAN-1315769894-303 
Page 17

Page 18

Page 18

Page 19

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 8 JUNE 2022 
SUBJECT: ANALYSIS OF SECONDARY SCHOOL LEAVER ATTAINMENT
2020-2021 
BY:  DEPUTE CHIEF EXECUTIVE: (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform Committee of the SQA leaver attainment across our secondary
schools and for this data to be fully scrutinised as part of our raising
attainment and improvement strategy.  This is an update to the Initial
Attainment Report for Secondary Schools 2021 previously presented to
Committee on 24 November 2021, updated and now presented to Committee
at first opportunity following local government elections in May 2022.   
1.2 This report is submitted to Committee in terms of Section III (D) (1) of the 
Council's Scheme of Administration relating to all the functions of the Council 
as an Education Authority. 
2. RECOMMENDATION 
2.1 It is recommended that Committee: 
(i) scrutinise and note the Senior Phase Leaver Attainment across
our Secondary Schools in Moray for session 2020/2021 with
specific regard to the National Measures for leavers published on
Insight in February 2022; 
(ii) scrutinise and note the actions for improvement arising from the
2020/2021 attainment performance; and 
(iii) acknowledge and commend practitioner commitment, extensive
preparation and support of young people throughout the session
as we return to an examination based model as well as young
people’s resilience and dedication throughout last session’s
Alternative Certification Model period. 
Item 7.*
Page 19

Page 20

3. BACKGROUND 
SQA Attainment – Session 2020/21
3.1 Contextual background is provided in order to support review of data 
presented in subsequent sections.  Following continued disruption due to the 
Covid-19 public health emergency, the Deputy First Minister announced 
cancellation of National 5 examinations  for 2021 and requested that SQA 
develop an Alternative Certification Model (ACM) to replace 2021 exams for 
National 5.  This was to be based on teacher judgement and supported by 
assessment resources and quality assurance instead of a final examination 
based assessment process. 
3.2 On 8 December 2020, the Deputy First Minister further announced the 
cancellation of 2021 exams for Higher and Advanced Higher, and instructed 
SQA to extend the 2021 ACM to Higher and Advanced Higher. 
3.3 From the start of Term 3 in January 2021, a second period of National
lockdown commenced following the announcement by Scotland’s First
Minister on 19 December 2020 due to impact of Covid-19.  In January 2021,
online learning and Remote Learning approaches were re-established across
all schools alongside childcare provision for critical key workers and identified
vulnerable children and Additional Support Needs (ASN) pupils across all of
the schools in Moray.   
3.4 Return of some Senior Phase (S4-S6) learners to our school buildings in
support of practical based subjects was provided in line with Scottish
Government guidance and mitigations from early March 2021.  This enabled
completion of practical work which could not be undertaken at home.  SQA
following advice from the National Qualifications 2021 group revised guidance
on course content and assessment, further removing requirement for
submission of coursework as part of evidence requirement for SQA courses. 
3.5 For session 2020/2021, provisional results were shared with learners by
schools in advance of the 25 June deadline for initial result submission to
SQA.  Subsequently, SQA progressed with formal certification of these results
as scheduled on 10 August 2021 with further opportunity as required for
appeals of which few were submitted for Moray learners due to rigour of the
ACM quality assurance process in place across Moray schools. 
3.6 For learners in S5 and S6, session 2020/2021 was the second year of
disruption faced by them in relation to their schooling and to the SQA
examination system with move to an ACM.  Learners in S4, S5 and S6 have
not yet participated in an examination diet or related experience (e.g. in-
school preliminary examinations or ‘prelims’) as was in place prior to session
2019/2020.  As noted nationally, many young people have reported their
mental health and wellbeing has been adversely impacted as a result of the
Covid-19 pandemic, where schools have continued focus on supporting and
monitoring wellbeing while also aiming to raise attainment and achievement
for all in a very different school experience.  Increased anti-social behaviour
Page 20

Page 21

has also arisen in certain localities involving some young people, with
increase in exclusion across some schools. 
Leaver Attainment
3.7  The Insight data we receive each year for cohort attainment across  S4, S5 
and S6 focuses on performance in the Senior Phase across four key national 
benchmarking measures: 
• Improving attainment in Literacy and Numeracy
• Improving attainment for all
• Increasing post-school destinations
• Tacking disadvantage by improving the attainment of lower attainers
relative to high attainers 
3.8 Insight encourages us to take a holistic approach to evaluating attainment and
achievement that takes into account the performance within Moray across all
four measures in 3.7 above.  We also use our breadth and depth of SCQF
level qualifications for leavers as a measure against our virtual comparator. 
3.9 Senior Phase Attainment meetings have taken place with secondary schools
to analyse the SQA performance data and to set actions for improvement
appropriate to all schools on an individual basis.  Final meetings occurred in
December 2021 with previous ACM Quality Assurance and Data Meetings
taking place during March to June 2021 analysing data sets forming the basis
for this report, now in final format. 
3.10 In addition to Senior Phase Attainment meetings and central local authority
scrutiny and support visits, working with the Scottish Government advisor for
Insight, we have embarked on a 2-year pan-authority Insight Strategy for
Moray with analysis and discussion sessions held during March to May 2022
for colleagues within Education across our Moray system including the Central
Education Team, School Leaders, Academic and wider partners, Subject
leaders and Subject colleagues.  Through sessions held, data literacy and
awareness of critical attainment messages has been raised, with next steps
planned for continuous improvement. 
3.11 A complete picture of the performance of a school, local authority or Scotland
in totality requires data from all four key measures to be considered together. 
However, as indicated in the Insight update letter of 21 February 2022 to
Directors of Education in Scotland, caution is expressed with year on year
comparisons due to different approaches to assessment and certification in
place.  “Results will be affected by the coronavirus (COVID-19) pandemic. In
particular, the cancellation of exams and external assessment of coursework
in 2020, and the use of the Alternative Certification Model in 2021, will have
affected the attainment of many 2020/21 school leavers. It is also likely that
the pandemic will have continued to affect the destination choices made by,
and opportunities available to, some school leavers in 2020/21”. 
Page 21

Page 22

3.12 Although the latest set of annual exam results become available on Insight in
September each year, the school leaver destination data is not available until
December.  This appears in Insight following update in February of the
following year.  Therefore, it is only possible to provide a complete picture of
attainment and achievement from March/April onwards each year, this paper
presented to Committee at earliest opportunity following local government
elections in May 2022. 
3.13 Our Best Value Audit Report for Moray highlighted scope for improvement in
levels of attainment for a number of measures; this was extracted from our
attainment data for session 2017/18.  Within this Committee report, data from
2017/18 is noted along with data from 2018/19, 2019/20 and 2020/21 in order
to demonstrate progress made to date as well as actions that are planned for
improvement, albeit within very different assessment processes and
educational environments to previous sessions when arriving at final grades,
making ‘like for like’ comparisons difficult. 
3.14 Committee should also be aware that over the course of session 2020/21
there was significant disruption to learning.  The ‘new’ timetable did start early
during the first lockdown however learning was being undertaken remotely
and approaches to remote learning, including roll out of devices were in the
early stages.  S4 learners in particular were not used to timed in-class
assessments during August to December – this time was identified as a key
opportunity to cover as much content as possible.   
3.15 In normal sessions prelims would take place in January, however they did not
take place due to the second lockdown and examinations had already been
cancelled.  As a result young people had limited opportunities to undertake
controlled assessments under examination conditions until they returned to
school in April 2021.  Although the period for gathering evidence was
extended, some young people will have found this a particularly anxious time. 
Page 22

Page 23

4 SENIOR PHASE ATTAINMENT ANALYSIS OVERVIEW – LEAVERS’ DATA 
Improving attainment in Literacy and Numeracy
4.1 This measure presents the percentage of leavers achieving an award in
Literacy and Numeracy at Scottish Credit and Qualifications Framework
(SCQF) Levels 4 and 5 by the end of their school experience in Moray,
compared with pupils with identified similar characteristics across Scotland
(Virtual Comparator) for each of the last five years.  This is shown in graph
form below for Moray (all leavers, percentage attaining Literacy and
Numeracy at SCQF level 4 and 5). 
Five-year analysis:  Moray performance at SCQF level 4 and 5 against Virtual Comparator
Page 23

Page 24

Literacy &
Numeracy Year
% Level 4
Literacy
% Level 4
Numeracy
% Level 5
Literacy
% Level 5
Numeracy
Moray 2021 95.90 93.29 83.39 69.85
VC 2021 94.32 91.18 81.62 70.07
Moray 2020 92.95 88.29 80.88 63.56
VC 2020 93.57 91.97 80.13 69.65
Moray 2019 93.30 87.16 80.46 63.89
VC 2019 93.73 91.13 79.46 65.04
Moray 2018 92.22 87.46 78.38 62.38
VC 2018 93.89 90.28 78.64 66.63
Moray 2017 95.26 87.07 80.06 60.78
VC  2017 94.43 90.51 79.30 67.87 
4.2 The information in the graphs and table in 4.1 show that with regards to
literacy and numeracy, Moray has improved leaver attainment overall at
SCQF level 4 and level 5 Literacy and SCQF level 4 Numeracy against the
Virtual Comparator (VC). On review of the past four year’s data, this is a
positive and improving trend overall, particularly with regard to SCQF level 4
Numeracy.  Numeracy at level 5 has also notably improved, with positive
increase in performance of 6.29% on 2020 leaver cohort attainment.  Green
shading indicates positive and improving performance on previous session
against VC, amber indicating performance marginally below VC and red
shading highlighting trend performance not in line with VC. 
4.3 Compared with targets set for Literacy and Numeracy within our current
Raising Attainment Strategy for Moray for the current session for learners
achieving SCQF 4 level or above, Literacy and Numeracy, overall we have
met our Literacy and Numeracy targets set.  Buckie High School, Forres
Academy, Keith Grammar School, Lossiemouth High School and Milne’s High
School exceed target set for Literacy.  Almost all secondary schools meet or
exceed target set for Numeracy:  Buckie High School, Elgin Academy, Elgin
High School, Keith Grammar School, Lossiemouth High School, Milne’s High
School and Speyside High School.  Almost all schools perform above VC data
set for 2021 for school leavers. 
Moray’s Raising Attainment Strategy Target Analysis:
Literacy & Numeracy Year % Level 4 Literacy % Level 4 Numeracy
Moray 2021 95.90 93.29
Target 2021 96.00 92.00
Variance 2021 -0.10 +1.29 
Page 24

Page 25

4.4 Focus on ensuring our young people leave with highest possible levels of
Literacy and Numeracy continues across our secondary schools.  Our Senior
Leadership Teams and subject leaders continue to scrutinise cohort data and
supported by wider equity teams and Principal Teachers of Raising
Attainment and Alternative Curriculum, have supported young people in
accessing additional interventions in order to secure core Literacy and
Numeracy qualifications at the highest possible SCQF level appropriate for
them, by their point of exit – S4, S5 or S6 – from secondary schools. 
4.5 Further initiatives and interventions to support improvement in attainment for
literacy and numeracy across Moray has included: 
• Use of additional Covid monies to support recovery and intervention,
with staff deployed to support literacy and numeracy and assessments. 
This has included teachers of literacy/numeracy and Principal Teachers
of Raising Attainment/Equity
• Robust tracking and monitoring across our schools of Literacy and
Numeracy attainment, to ensure best possible outcomes for all learners
• Increased focus on literacy and numeracy throughout Covid-19
disruption, strengthening skills development and focussed time
• Scrutiny of literacy and numeracy across our schools, supported by the
Insight analytical dataset for highlighting any underperformance and
identifying wider attainment gaps
• Additional time in the Broad General Education and Senior Phase to
support literacy and numeracy, including working with ASG Primary
Schools and focus on Numeracy interventions and strategies 
Improving attainment for all
4.6 This measure allows us to examine how different ability cohorts are attaining
in relation to the appropriate virtual and national cohorts.  Attainment is
measured using the tariff scale, which was developed for Insight.  This
allocated a specific number of points to each qualification (including non-
examination, unit-based courses).  More demanding qualifications gain more
points than less demanding ones and in graded courses, a grade ‘A’ is
equivalent to more points than a grade ‘C’ for example, within the same
course 
4.7 Three ability cohorts are identified for each school, the VC, the Northern
Alliance (Regional Improvement Collaborative) and Scotland as a whole: 
those in the bottom 20% of tariff points achieved, those in the top 20% and
those that fall within the middle 60% of tariff points achieved based on the
courses they have undertaken and completed.
Page 25

Page 26

4.8 Complementary tariff is a score that looks at parity of achievement of young people in
their top five qualifications studied.  It is not affected by the number of qualifications
and units a young person completed; this removes the inequality and anomalies with
different curriculum structures across Scotland of which there are many. 
3-year analysis:  Moray performance at SCQF level 4 and 5 against VC 
Complementary Tariff Year Lowest 20% Middle 60% Highest 20%
Moray 2021 129 631 1,277
VC 2021 137 638 1,315
Northern Alliance 2021 143 669 1,328
National 2021 144 692 1,339
Moray 2020 117 595 1,284
VC 2020 130 610 1,286
Northern Alliance 2020 142 654 1,321
National 2020 133 657 1,313
Moray 2019 127 555 1,205
VC 2019 130 568 1,244
Northern Alliance 2019 133 591 1,252
National 2019 134 623 1,267 
Page 26

Page 27

4.9 The graph and data table in 4.6 above shows attainment of our young people
leaving school in 2021.  They show that in Moray, the lowest 20% are slightly
below the VC (8 points).  However, schools in Moray including Keith Grammar
and Lossiemouth High School perform above the VC for the lowest 20% of
pupils, with key learning shared regarding course choices and options
available.  As part of our Moray approach to Curriculum review and our Insight
Strategy for Moray, performance at this level is being considered in addition to
course options available to suit young people and cohort interests and need. 
4.10 The middle 60% of leavers are broadly in line with the VC (7 points below) but
are below the Northern Alliance and National average.  However, this is an
improvement in session 2020 by 36 tariff points, which is broadly equivalent to
a course award at SCQF level 4.  Forres Academy, Lossiemouth High School
and Milne’s High School perform well for this group of leavers.  Schools are
continuing to review their Curriculum offer for this group of learners, with
further move to review Curriculum offer in line with our Insight Strategy for
Moray. 
4.11 The highest 20% of leavers in Moray performed lower than the VC (38 points)
which is broadly equivalent to learners achieving top grades in most subjects
but not all (e.g. grade ‘A’ in all subjects except one at Grade ‘B’).  It is noted
that this gap has widened and schools are continuing to review through their
Tracking and Monitoring of Senior Phase students, how to maximise
attainment and achievement by point of exit.  Tracking throughout the session
along with coaching conversations with Senior Phase students on an ongoing
basis is ensuring both coursing of young people along with levels of
achievement are appropriate against individual targets set. 
4.12 Underperformance in specific subject areas remains a focus for Senior
Leaders through our Insight Strategy, with next steps identified at individual
school levels.  It is noted that Elgin Academy, Elgin High School and Forres
Academy perform well in this area (highest 20%).  Progress with our Insight
and Curriculum strategies for Moray and review of our Raising Attainment
Strategy will support improvement in our performance.   
Page 27

Page 28

Leaver Initial destinations – Increasing post-school participation
4.13 This measure shows the percentage of young people securing an initial
positive post-school destination when they leave school at their point of exit in
S4, S5 or S6. 
4.14 Destination figures reflect choices made by pupils along with opportunities
available to them upon leaving school.  The availability of particular
opportunities (e.g. employment opportunities) have been impacted upon by
the Covid-19 pandemic and options available to school leavers may also have
been further impacted upon by approaches to certification in 2020 and 2021,
and attainment levels achieved.  This should be considered when reviewing
this measure as outlined in 3.1-3.15 above. 
4.15 The above graph shows 5-year data on the percentage of Moray school
leavers progressing on to positive destinations compared to their VC, Moray,
the Northern Alliance and National comparators.  The data table below
highlights data trends and performance, in percentage terms. 
Year Moray VC Northern
Alliance
National
Establishment
2021 94.08 95.64 95.32 95.48
2020 93.07 93.78 92.99 93.36
2019 92.76 95.30 94.98 95.05
2018 93.62 95.05 94.99 94.40
2017 93.53 94.02 94.39 93.72 
Positive trend improvement is noted for Moray from 2019 to 2021, whereby
2021 holds the highest positive destination figure for Moray across the past 5
years.  However, in 2021 Moray remains marginally below the VC, Northern
Alliance and National Establishment.   
Page 28

Page 29

4.16 In reviewing our destinations, figures of particular note are shaded in yellow in
the table below.  In Moray, those entering employment is higher than the VC
but in line with Northern Alliance local authorities and National.  Those
entering Further Education is higher than VC, Northern Alliance and National
averages.   
4.17 Numbers entering Higher Education in Moray are lower than VC, Northern
Alliance and National, which may be offset against more young people
progressing to Further Education. 
4.18 Of particular note, are the numbers of young people entering a less positive
destination, with those ‘unemployed seeking’ and ‘unemployed not seeking’
higher than the VC, Northern Alliance and National averages.  Work continues
with our schools in partnership with Skills Development Scotland and DYW
Moray to strengthen pathways to post-school destinations.  Pathway planning
continues in our schools with focus on all young people and particularly those
with an unconfirmed or unknown post-school destination. 
4.19 The positive destination breakdown for Moray is collated from 8 very different
schools and operational contexts.  Covid-19 has continued to impact on
session 2020/2021 with related economic downturn nationally and locally. 
This has potentially contributed to unemployed figures noted above.   
4.20 Schools overall are marginally below VC, with Elgin High School and
Lossiemouth High School operating above the VC.  We will continue to work
with partners including Skills Development Scotland and DYW to ensure all
Moray learners have access to information in support of accessing
appropriate post-school pathways based on interest and individual talents. 
Year %
Employed
%
Further Education
%
Higher Education
%
Not known
%
Personal Skills Development
%
Training
%
Unemployed Not Seeking
%
Unemployed Seeking
%
Voluntary W
ork
Moray 2020/21 27.42 26.62 37.09 0.23 0.46 2.28 2.16 3.53 0.23
VC 2020/21 25.53 24.81 40.91 0.25 0.50 3.58 1.73 2.38 0.31
Northern
Alliance 2020/21 27.47 22.80 41.67 0.46 0.34 2.75 1.89 2.33 0.31
National  2020/21 22.58 23.29 45.11 0.30 0.47 3.67 1.69 2.53 0.37
Page 29

Page 30

Tacking disadvantage by improving the attainment of lower attainers
relative to higher attainers
4.21 The graph below shows 2020/2021 leaver attainment data (using
complementary tariff scores) for Moray against the Virtual Comparator, broken
down into the ten deciles according to the Scottish Index of Multiple
Deprivation (SIMD).  Decile 1 refers to attainment of young people living in
areas with postcodes considered the 10% most deprived in Scotland
according to SIMD.  Decile 10 refers to those young people living in postcodes
identified as the 10% least deprived datazones according in SIMD.  In Moray,
following reclassification of SIMD criteria, we now have young people within
decile 1 within Elgin High School ASG.  We continue to monitor the use of
SIMD as a measure in authorities where rural poverty and other wider poverty
related factors are of concern; however, these are not fully considered
nationally within SIMD classification. 
4.22 The graph suggests that school leavers in Moray compare well within decile 1,
3, 4, 6, 8 and 9 against the VC, either above or overall, in line with the VC.  It
is noted that young people in SIMD 2 and 5 are achieving in line or below the
VC and in SIMD 7 and 10, below the VC.  This was similar to last session with
regard to young people in SIMD 7 and 10.  It is important to note that the
number of young people within each decile is represented on the graph by the
size of the circle presented.  In this regard, the highest number of young
people in Moray fall within SIMD 4 to SIMD 8.  Vertical lines within each SIMD
show the range of attainment for young people across each decile. 
Page 30

Page 31

4.23 The comparison can also be made against the National picture rather than
VC.  The graph below shows this performance – Moray against National
Establishment: 
4.24 This graph highlights that young people in SIMD deciles 2 to 8 and 10 perform
less well against the National average.  This was similar to performance in
session 2019/2020.  The leavers in SIMD decile 1 compares well nationally
and SIMD 9 performed in line with the National average.  However, SIMD is
not reflective of rurality or similar local authority contexts to Moray, noting
caution in data interpretation. 
4.25 In Moray, we continue to review our Senior Phase Curriculum offer and
through careful pathway planning, ensure our young people where at all
possible progress to positive post-school destinations as highlighted in 4.17-
4.20 above.  We continue to work towards consistency in approach across our
Moray Secondary schools and work on Curriculum cohesion and review of
alternative course awards and approaches to Curriculum delivery including
partnership with Moray College UHI, we aim for all learners to achieve
suitable qualifications by point of exit from Moray schools. 
Breadth and Depth of Qualifications
4.26 This measure considers the breadth (number) and depth (SCQF ladder level
studied) of qualifications achieved by our young people in Moray.  This
demonstrates the suite of qualifications that our 837 leavers gained
throughout their Senior Phase by point of exit, whether in S4, S5 or S6 as they
reach school leaving age or natural point of exit from their secondary
schooling based on their chosen pathway and qualifications required.
Page 31

Page 32

4.27 The table below considers our Moray leavers’ attainment against overall
leaver attainment in 2019/2020.  Where green shading is shown, a higher
percentage of leaver overall attainment than session 2019/2020 has been
achieved.  While some gains are marginal, of particular note are the
achievement of young people at SCQF level 5, 6 and 7 achieving a greater
number of qualifications by point of exit from school than in previous sessions. 
For example, 45.85% of leavers left school with 7 or more SCQF level 5
(National 5 equivalent) qualifications.  At SCQF level 6, 34.24% of leavers
attained 5 or more SCQF level 6 courses (Higher equivalent).  In 2020/2021
10.24% of leavers also left school with 2 or more SCQF level 7 (Advanced
Higher equivalent) courses. 
4.28 Within Moray, work continues on improving Curriculum offer for wider breadth
and depth.  This includes working with partners, Moray College UHI and intra-
authority on consortia curriculum arrangements and shared delivery.  Further
work will follow post pandemic, in session 2021/2022. 
4.29 The table below highlights overall performance across key breadth and depth
measures against the VC.  This measures how many qualifications learners
achieved at all SCQF level qualifications (SCQF level 5, 6, 7); this includes
National 5, Higher and Advanced Higher awards as well as other
qualifications, including Skills for Work and National Progression Awards at
level 5.  Key measures are:  
• 1+, 3+, 5+ and 6+ qualifications at SCQF level 5
• 1+, 3+ and 5+ qualifications at SCQF level 6
• 1+ qualifications at SCQF level 7
Awards Level 1 Level 2 Level 3 Level 4 Level 5 Level 6 Level 7
1 or more 97.72% 97.61% 97.38% 96.81% 88.74% 63.94% 23.66%
2 or more 96.13% 96.02% 95.68% 94.31% 83.28% 56.54% 10.24%
3 or more 93.63% 93.40% 93.06% 91.92% 79.29% 49.72% 2.73%
4 or more 90.78% 90.33% 90.10% 88.51% 72.81% 42.43% 0.11%
5 or more 85.89% 85.32% 85.10% 83.16% 65.76% 34.24% 0.00%
6 or more 77.36% 76.79% 76.56% 74.74% 57.34% 23.55% 0.00%
7 or more 64.85% 64.39% 64.05% 62.91% 45.85% 14.33% 0.00%
8 or more 50.28% 50.06% 49.72% 48.81% 33.79% 6.48% 0.00%
9 or more 31.06% 30.94% 30.94% 29.58% 19.68% 1.82% 0.00%
10 or more 17.06% 16.95% 16.84% 16.15% 9.56% 0.57% 0.00%
Page 32

Page 33

SCQF 
level 5
SCQF 
Level 6
SCQF
level 7 
1+ 3+ 5+ 6+ 1+ 3+ 5+ 1+
2021        
Moray 88.7% 79.3% 65.8% 57.3% 63.9% 49.7% 34.2% 23.7%
VC 89.0% 78.7% 67.4% 60.5% 65.5% 52.0% 37.6% 24.1%
2020        
Moray 87.6% 74.6% 61.9% 55.1% 61.2% 48.5% 34.2% 22.0%
VC 87.6% 76.5% 65.0% 57.4% 63.1% 50.3% 36.8% 22.6%
2019        
Moray 88.6% 74.9% 61.6% 50.3% 58.7% 44.5% 29.5% 18.7%
VC 87.8% 74.0% 60.7% 52.7% 60.6% 46.5% 32.3% 19.1% 
4.30 The green highlight within the table in 4.29 above indicates an increase in
leaver attainment between cohorts from session 2019/2020.  Across breadth
and depth measures, there continues to be improvement. However, across
most measures it is noted that Moray continues to perform marginally below
the VC. 
4.31 The table below considers performance of Moray’s leavers in comparison with
our target for leavers at SCQF level 5 and SCQF level 6, achieving 5 or more
awards by point of exit. 
SCQF Level 5 SCQF Level 6 
5+ 5+
2021
Moray 65.8% 34.2%
Target 67.0% 38.0%
Variance -1.2% -3.8%
Number of leavers 10 32 
4.32 At SCQF level 5 and level 6, while improvements in performance continue we
remain marginally below local authority targets set for SCQF level 5 (5+
awards) and SCQF level 5 (5+ awards) by point of leaving school.  Schools
which have performed well in relation to this target at SCQF level 5 are Keith
Grammar School, Lossiemouth High School and Milne’s High School. 
Schools performing well for SCQF level 6 in relation to target above are Elgin
Academy, Forres Academy, Lossiemouth High School and Milne’s High
School.  Study at level 7 is appropriate based on individual learner pathways
where for some learners, additional SCQF level 6 qualifications may be more
suitable for University entry (breadth as opposed to depth achieved through
Advanced Higher Study).  Elgin Academy, Forres Academy, Lossiemouth
High School and Speyside High School perform well in this area in relation to
local authority average.
Page 33

Page 34

Summary
4.33 Following an uncertain year with unprecedented times and disruption due to
Covid-19, the leaver attainment in Moray shows a number of improvements
against previous session’s attainment and wider comparator data.  We
continue to monitor our data noting data comparison caution in 3.11 above. 
Work continues with all schools to ensure more pupils across Moray have the
opportunity to undertake 7 and more level 5 qualifications in S4 with this
initially being for Application of Maths but will extend to other subject areas as
appropriate.  We continue to review approaches in line with recent OECD
reports relating to the review of Curriculum for Excellence into the future and
work underway on review of Senior Phase qualifications following the Stobart
report on upper-Secondary education student assessments and National 
reviews underway. 
4.34 Schools continue to work individually and collectively on ensuring their
Curriculum remains current and responsive to learner needs, with further
approaches underway in extending our Moray Curriculum offer.  Data literacy
and interrogation continues to strengthen with support from the Scottish
Government Insight Advisor as part of our Moray Strategy, supported by our
continued focus on raising attainment and improving outcomes.  Support and
challenge of school activities and key messages from attainment continue to
be a focus with Secondary Head Teachers, through in-school activities and
from the central Education Quality Improvement team as part of our school
visit programme.  Developments which continue to contribute to our Raising
Attainment agenda across our Education service will continue to be reported
to Education, Children’s and Leisure Services Committee.  Actions for
improvement to breadth and depth of attainment were previously reported to
Committee in November 2021. 
5 SENIOR PHASE SQA EXAM PROCESS FOR 2021/2022 
5.1 On 18 August 2021, it was announced by the Cabinet Secretary for Education
and Skills that examinations will be held for National 5, Higher and Advanced
Higher Courses for session 2021/2022.  This decision was informed by the
views of stakeholders including the National Qualifications Group, and by
public health advice.  Learning Experiences akin to Prelims (LEAPs) were
undertaken in Moray in January/February 2022 to prepare learners for return
to SQA Examination based model in May 2022.   
5.2 SQA examinations are currently underway, commencing on 26 April 2022 and
running until 1 June 2022, with relaxations in public health requirements in
April 2022 enabling these nationally.  In Moray, we continue to build on the
good practice across schools with SQA coordinators working closely with the
local authority SQA lead QIM to ensure pupils and staff are supported in
delivery and assessment preparation.
Page 34

Page 35

5.3 Modifications to assessment requirements for National 5, Higher and
Advanced Higher courses were announced by SQA to support reduction in
the volume of assessment and ensure learners continue to achieve credible
qualifications.  For most courses, these modifications remain the same as
those that were put in place for session 2020/2021.  Further study support
materials were also published in March 2022.  Exceptional Circumstances
arrangements are also in place should candidates be unable to sit their
examination due to illness (e.g. Covid-19 related) with a post-certification
appeals system in place from August 2022 should this be required. 
5.4 Sincere gratitude is expressed to all Moray secondary schools and
practitioners in supporting our young people to maximise their achievement
and attainment.   
6 SUMMARY OF IMPLICATIONS 
a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP))
Reflective of priorities within the Corporate Plan with particular regard to
(3) provide a sustainable education service aiming for excellence and (4)
day to day service delivery in line with council values of ambitious,
improving and responsive.  With regards to the 10 Year Plan (Local
Outcomes Improvement Plan LOIP), (2) building a better future for our
children and young people in Moray through equity of learning experience
offered across our schools. 
b) Policy and Legal
There are no legal implications arising from this report. 
c) Financial implications
There are no financial implications arising directly from this report. 
d) Risk Implications
There are risk implications as to how this attainment dataset will continue
to be used as comparator data for the next 3-5 years and may skew future
performance reporting.  The data presented herein reflects year 1 of
reversion to an examination based system, differing to the previous two
session’s ACM and the examinations in place during session 2018/2019. 
There is also the consideration that more young people will continue to
stay on at school beyond S4 and S5 due to coronavirus pandemic and the
associated uncertainty with labour market related factors to consider. 
Likewise, concerns regarding wellbeing and Mental Health and impact on
learner outcomes and attainment.   
Schools further identify increases in Additional Support Needs among
pupils, impacting on number of courses studied and levels of study.  This
has noted impact on attainment measures outlined above and is
anticipated to increase based on Broad General Education cohort
information.  A number of young people, due to their additional support
Page 35

Page 36

needs, access a personalised curriculum with individual targets and
outcomes.  An increase in Additional Assessment Arrangements (AAA)
required by young people undertaking examinations has resulted this
session, including Reader/Scribes, extra time, separate accommodation
and access to ICT for answering examination questions. 
Uncertainty surrounds potential change as a result of the unknown
direction of the Covid-19 pandemic as outlined above with relaxation in
mitigations around Covid-19.  A number of young people have been
impacted by Covid-19 during the session – both with their own absence
and that of their teachers – impacting on in-school learning and teaching.   
Funding for a number of key posts which have strengthened the Raising
Attainment agenda across our schools, noting positive improvements in
performance reported within this committee paper (e.g. Principal Teachers
of Raising Attainment; Covid-19 Recovery Teachers) has not been
continued post-June 2022 per March 2022 Children and Young People’s
Services Committee.  In consequence, there is a risk regarding 2022/2023
attainment levels in regard to this and early caution is expressed. 
All of the above are likely to have an effect on SQA results and overall
performance data in future years.  Changes in assessing qualifications in
2020 and 2021 as a result of cancellation of examinations as well as return
to examinations this session creates risks relating to accountability and
data comparability.  This has been further noted in 3.11 above. 
e) Staffing Implications
There are no staffing implications arising directly from this report. 
f) Property
None. 
g) Equalities/Socio Economic Impact
An Equality/Socio Economic Impact Assessment is not required as this
report is to inform Committee on performance. 
h) Climate Change and Biodiversity Impacts
No climate change or biodiversity implications have been determined due
to the scrutiny based nature of activities reported and no findings related to
such implications contained herein.     
i) Consultations
Senior Officers in Education, Communities and Organisational
Development, Paul Connor, Principal Accountant, Equal Opportunities
Officer, Human Resources Manager, Tracey Sutherland, Committee
Services Officer have been consulted and are in agreement with the
contents of this report as regards their respective responsibilities.
Page 36

Page 37

6. CONCLUSION 
6.1 The Committee is invited to consider and note the SQA assessment
process completed and leaver attainment data presented based on
Alternative Certification model and disruption due to Covid-19,
experienced during session 2020/2021 
6.2 The Committee is asked to acknowledge work underway in order to
prepare young people for examinations across Moray Schools during
the continued Covid-19 pandemic and associated uncertainty in session
2021/2022 
6.3 The Committee is asked to consider the potential impact on examination
performance for session 2021/2022 with reversion to an examination
based model after two different years of Alternative Certification Model
and disruption experienced over the year, in advance of Initial
Attainment Report to Committee in September 2022 
Author of Report:  Stewart McLauchlan, Quality Improvement Manager 
Background Papers: 
Ref: SPMAN-1315769894-311
Page 37

Page 38

Page 38

Page 39

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE 8 JUNE 2022 
SUBJECT: MORAY EDUCATION – EARLY LEARNING AND CHILDCARE
INCOME GENERATION 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the success of the Early Learning and Childcare
(ELC) top up hours currently being offered at Linkwood Nursery. 
1.2 To seek approval to extend the ELC top up offer to all year round services in
Moray. 
1.3 This report is submitted to Committee in terms of Section III (D) (1) of the
Council's Scheme of Administration relating to exercising the functions of the
Council as an Education Authority. 
2. RECOMMENDATION 
2.1 It is recommended that Committee: 
i) note the ongoing success of the ELC top up hours at Linkwood
nursery; 
ii) agree to the extension of the top up offer to include all year round
settings. This would also extend to offering top up hours on the
occasional day within each Associated School Group (ASG); and 
iii) note that the impact of the above offer will be assessed as part of
the ongoing work to manage the cost of the ELC service
downward to come within budget and any future adjustments will
be considered based on the operating experience and income
generated. 
Item 8.*
Page 39

Page 40

3. BACKGROUND 
3.1  To date the Scottish Government have provided a capital and a revenue
element to support the provision of the expansion of ELC to 1140 hours, as
per the statutory requirement referred to in a previous report to this Committee
on 26 January 2022 (para 16 of the minute refers). A key priority of this
commitment was to provide a flexible service which provides parents/carers
with choice of times and provider to allow them to return to, or continue with,
work. 
3.2 In Moray there was a phased approach taken to expand all services by
August 2020. The impact of the COVID pandemic meant that this was not
realised until August 2021. 
3.3  When the delivery plan for 1140 hours was developed by the ELC expansion
team, it was recognised that there would be potential scope to generate
income however work was never done around this due to the COVID
pandemic. 
3.4  From inception the delivery plan noted that 8 of the 24 local authority settings
would offer a year round service with varying hours between 8am and 6pm.
The remaining 16 settings remained term time with an offer replicating the 6
hour day that is followed by schools. 
3.5  The initial 8 year round settings were; Seafield Nursery, Millbank Nursery,
Lady Cathcart Nursery, Lhanbryde Nursery, Linkwood Nursery, Cullen
Nursery, Pilmuir Nursery and Aberlour Nursery. 
3.6  The 8 year round settings monitored the uptake of 1140 hours throughout the
phased approach, including during the COVID pandemic and recovery. The
monitoring of child figures highlighted 2 settings where families were not using
the full, year round offer. However the remaining 6 saw an increased uptake in
the 1140 hours. 
3.7  Both Millbank Nursery, Buckie and Aberlour Nursery, Aberlour families are not
using the year round offer and we are currently working on a Change
Management Plan (CMP) to potentially revert these services back to term
time. If the CMP is agreed then this would start in August 2022, at the start of
the new academic year. 
3.8  The remaining 6 nurseries are experiencing a high volume of uptake for year
round 1140 hours but nursery managers are also receiving requests for
additional top up hours to meet childcare needs. 
3.9  Following agreement at this Committee on 9 March 2022 (para 14 of the
minute refers) work started to trial top up hours at Linkwood Nursery, Elgin.
The success of this work is showcased with actual and projected income
generation and parental feedback in Appendix 1.
Page 40

Page 41

3.10 After research amongst partner ELC providers, including childminders,
proposed costings for the top up are based on available session times and
would not require additional cost/staffing as already within contracted hours.
The basis of this would be; 
3.11 Given the remaining 5 year round nurseries are also receiving similar requests
and interest from parents/carers there would be scope to generate income for
ELC that would potentially offset some of the budget pressures as previously
highlighted in the report to this Committee on 9 March 2022 (para 14 of the
minute refers). Appendix 2 highlights costings and how this compares with
privately funded ELC settings. 
3.12 Each of the 5 year round nursery managers have services that are open 50
weeks and staff are already employed, on a rota basis, to cover Monday to
Friday typically between the hours of 8am and 6pm. There is a legislative
requirement to offer families a year round model to incorporate the 1140 hours
however we have identified timings where there are less children. The aim is
to optimise the childcare non-funded offer without incurring additional staff
costs. 
3.13 Reduced costs could also be achieved by reducing the operating hours of
these nurseries which would reduce staff costs.  However, the 8am to 6pm
hours enable more places to be offered and there is a risk that a reduction in
operating hours provides insufficient places to enable the delivery of 1140
hours to all eligible children.  Therefore, preference has been given to the
income generation option which provides the benefit of a more flexible service
to parents, supporting employment options for them and ensures the provision
of sufficient 1140 hours places.  This approach will be reviewed and assessed
based on experience as part of the wider work to manage the ELC budget
pressures.
Timings Indicative cost (families) Average hourly rate   
1-3pm £9.50 £4.75
3-5pm £9.50 £4.75
5-6pm £5.00 £5
Page 41

Page 42

3.14 The table below gives an example of capacity for offering non-funded hours at
2 of the proposed settings; 
Example setting No of spaces for
additional
chargeable hours
(within current
staffing
complement)
No of existing
staff to support
additional
chargeable hours
Potential hours on
offer for “top up” 
Seafield Nursery,
Elgin
Accommodates 3-5
year olds
Up to 25 additional
spaces (depending
on day and needs
of child)
Staffed to capacity 8:00am – 12:45 pm
12:45 – 5:45pm
8:00am – 5:30pm
Lhanbryde Nursery,
Lhanbryde
Accommodates
Eligible 2’s and 3-5
year olds
20-28 additional
spaces (depending
on day/needs and
age)
10 perm staff
3 temp staff
1-6pm 
3.15 The income generation would also offer parents/carers additional childcare on
occasional days in each ASG. Staff will still be working on these days
however children will not be entitled to use funded hours therefore top up fees
could be applied. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
This report relates to the priority ‘Provide a sustainable education service
aiming for excellence’ from the Corporate Plan and to ‘Building a better
future for our children and young people in Moray’ from the LOIP. 
(b) Policy and Legal
The Care Inspectorate inspects all registered services regulated under
the Public Services Reform (Scotland) Act 2010, which includes nursery
classes and playgroups. 
The authority has a duty to provide a quality early learning and childcare
place for every 3 and 4 year old whose parents wish it and for eligible 2
year olds. 
(c) Financial implications
The Financial implications would be for income generation rather than
expenditure. 
(d) Risk Implications
The risk implications could be that ELC services offer top up hours and
are not able to meet legislative requirement for funded 3 and 4 year olds.
Nursery Managers will ensure spaces for funded children are protected
to mitigate this risk. 
Page 42

Page 43

(e) Staffing Implications
No staffing implications as Nursery Managers will ensure that top up
hours are only offered within current staffing structures and session
times. 
(f) Property
There are no property implications arising directly from this report. 
(g) Equalities/Socio Economic Impact
There are no implications arising directly from this report, however
equalities impacts and considerations have been taken into account in
previous ELC reports. 
(h) Climate Change and Biodiversity Impacts
There are no climate change or biodiversity implications arising directly
from this report. 
(i) Consultations
Depute Chief Executive, Head of Education (Chief Education Officer),
Head of Education Resources and Communities, Chief Financial Officer,
Head of Human Resources, ICT and Organisational Development
Manager, Equal Opportunities Manager and Tracey Sutherland,
Committee Services Officer have been consulted and are in agreement
with the contents of this report as regards their respective
responsibilities. 
5. CONCLUSION 
5.1 The option to offer top up hours at local authority year round services
aims to provide a more flexible option of wrap around childcare for
parents and carers of pre-school children whilst also generating income
for the Council. Although the initial projected income from Linkwood
Nursery, Elgin is not a substantial amount when factored in an
additional 6 settings providing this offer, including the occasional day, a
steadier stream of income generation is anticipated. 
Author of Report: Hazel Sly
Background Papers: 
Ref:  SPMAN-1315769894-308 / SPMAN-1315769894-310 /
SPMAN-1315769894-309 
Page 43

Page 44

Page 44

Page 45

Appendix 1
Linkwood Nursery – Non-Funded Hours 1st Month Review 
On Monday 18th April Linkwood Nursery began offering additional non-funded ELC
hours.  On commencing this new service we initially had 2 families use our non-funded
hours’ facility and within the first month this has already increased to 7 families.  We
are confident that the number of families using our non-funded hours’ service will
continue to increase steadily (within nurseries capacity of 56 and not impacting on
funded hours) and that the option to be able to pay for additional hours will continue
support to our community’s ELC needs. The offer of non-funded ELC hours has no
additional cost to the Council as we are offering year round hours from 8am-6pm as
part of the Scottish Government legislation around the 1140 hour commitment. 
Linkwood Nursery Non-Funded Hours Income 
April 2022 = £256.50 (Actual)
May 2022 = £570.00 (Actual/Projected)
June 2022 = £684.00 (Projected) 
Parental Feedback – 13/05/2022 
“The extra hours have really helped me.  The staff are so lovely, kind and helpful. B
loves being at nursery and always comes out smiling and happy.  We just love
Linkwood Nursery.  B’s confidence has also increased since having the extra time in
nursery and it has allowed me to work extra shifts.”
“The extra non-funded hours have been extremely helpful to me meaning I can work
extra on those days without the stress of having to rely on other people collecting A
from nursery.  It also means I can pick both my children up from school/nursery at the
same time.  Hoping it continues.”
“First of all I would like to thank you for offering the non-funded hours service at H’s
nursery.  This is a great service and has allowed me to be able to work longer hours
while H is in nursery.  All the staff have worked very well to enable this service to run
smoothly.  My daughter has settled really well doing the extra hours and hope the
nursery will continue this opportunity, thank you.”
Item 8.*
Page 45

Page 46

Page 46

Page 47

Appendix 2
Non funded hours – Proposed costings
Private funded setting rates
Nursery Times Prices  Average hourly
rate
Ark childcare 9-1 (lunch included)
1-5 (Tea included)
5-6.30
£19.50
£19.50
£2.95 per half hour 
£4.87
VIP 8 – 5.30
8 – 1
1 – 5.30
£48
£27
£23
£5.11
Stramash 8.30 – 1
8.30 – 3.30
8.30 – 5.30
1 – 5.30
£25
£38
£45
£25
£5.55
Magic Roundabout 9 – 1
1 – 5
8 - 9 
£18.50 
£18.50
£4.50
£4.62
Rainbow Castle  Various £6.00 per hour
after funded hours
£6.00
Childminder’s Moray Various £4-£5 per hour £4.17 per hour
(although can
vary between
childminders) 
Local Authority rate
Linkwood Nursery
(current)
1pm – 3pm 
3pm – 5pm
5pm – 6pm
£9.50
£9.50
£5.00 
£4.75-£5.00
Seafield Nursery
Millbank Nursery
Lady Cathcart
Nursery
Lhanbryde Nursery
Cullen Nursery
Pilmuir Nursery
1pm – 3pm 
3pm – 5pm
5pm – 6pm
£9.50
£9.50
£5.00 
£4.75-£5.00 
Item 8.*
Page 47

Page 48

Page 48

Page 49

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 8 JUNE 2022 
SUBJECT: PERFORMANCE REPORT (EDUCATION) – PERIOD TO MARCH
2022 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the performance of the service for the period to 31
March 2022. 
1.2 This report is submitted to the Committee in terms of section III (D) (1) of the
Council’s Scheme of Administration in relation to the functions of the Council
as an Education Authority. 
2. RECOMMENDATION 
2.1 It is recommended that Committee: 
(i) scrutinises and notes performance in the areas of Service
Planning, Service Performance and other related data to the end
of March 2022; 
(ii) notes the actions being taken to improve performance where 
required. 
3. BACKGROUND 
3.1 On 7 August 2019, the Moray Council, approved a revised Performance
Management Framework for services (para 5 of the minute refers).   
4. SERVICE PLANNING 
4.1 Each service plan sets out the planned strategic and service level priorities
and outcomes it intends to deliver in the coming year aligning closely with
financial planning, corporate and community planning partnership strategic
priorities. This report provides an interim update on progress on the service
plan, key outcomes and performance indicators.   Committee is invited to
review progress to secure assurance that is satisfactory and to provide
scrutiny and further direction where performance requires attention. 
Item 9.*
Page 49

Page 50

4.2 The narrative included is by exception, links to Service Plan Actions and
Performance Indicators can be accessed within the Background Papers
section of this report. 
Strategic Outcomes - successes 
4.3 Work continues to progress on improving attainment at both Broad General
and Senior Phase levels.  Development of resources to support data literacy
and analysis including sharing of key data sets in relation to Achievement of
Curriculum for Excellence Levels (ACEL) and Senior Phase attainment
continue.  Sessions on Insight, the Senior Phase Benchmarking Tool, for
school leaders, central officers and partners across Moray are currently being
delivered by Education Scotland.  Further work will include Curriculum
sessions in June to maximise curriculum offer and attainment / tariff awards
available from enhanced supports. ACEL early indication data and June
predictions collected have been used to support and challenge school target
setting. (Action EDU STRAT 2.1 and 2.3) 
4.4 Senior Phase 2020-21 leaver attainment results were published at the end of
March through Insight.  Moray results show an improving trend across the
majority of key national indicators, including literacy and numeracy, positive
leaver destinations and accumulated tariff points. However, in a number of the
key indicators Moray continue to perform below that of our virtual comparator
and nationally.  A full report on the school leaver attainment data has been
submitted to this committee by the Quality Improvement Manager for
Performance, titled Analysis of Secondary School Leaver Attainment 2020-21. 
In addition an Education Public Performance Report (PPR) 2020-21 is
available on the Moray Council website, providing further breakdown of school
performance data including attainment, leaver destinations, attendance and
exclusion, and staying on rates at an ASG level. (Indicators EdS412.25,
413.01, 413.01a-c, 413.11, 413.12, 099a-b and CHN4, 5, 11) 
4.5 Development of a post-Covid Parental Engagement Strategy has been
prepared with strong links to key national and local priorities including the
Raising Attainment Strategy.  The draft strategy is currently out for
consultation with central officers, after which it will go to the Parental
Involvement and Engagement (PIE) strategy group for consideration.  Further
work continues to support the strategy with schools providing information to
highlight aspects of PIE that can be included in the strategy, and an online
RAG
STRATEGIC
LEVEL
Improved attainment at both the Broad
General and Senior Phase 81%
Curriculum 47%
Learning, Teaching and Assessment 44%
Leadership 75%
Supporting All Learners 73%
Self-evaluation for Self-improvement 79%
65%
Comment
Service Plan - Annual progress is measured by milestone achievements,
with due dates aligning with the academic year (June 2022). At this point of
the reporting year satisfactory progress has been made against the
majority of actions, however some acitons have not progressed due to
staffing challenges.
Performance Indicators - Majority of indicators show a positive trend on
previous performance and against targets, including 2020/21 LGBF
indicators.
SERVICE PLAN PRIORITIES
SERVICE
LEVEL
OVERALL PLAN PROGRESS 7
41
9
SERVICE PLAN PI'S
Achieving
Target
Within Target
Below Target
Data Only
21
Page 50

Page 51

page will be developed where practitioners can share learning. (Action EDU
STRAT 2.4) 
Strategic Outcomes – challenges and actions to support
4.6 Collaborative working across the Community Planning Partnership has been a
priority, with the central team successfully supporting a wide range of groups
across the partnership.  However, staffing challenges and increased demands
on the team have impacted on officer time and availability for core education
work.  This has been carried forward as an action in the 2022-23 Service Plan
but consideration of partnership tasks will be RAG rated based on priority and
level of engagement required from Education. (Action EDU STRAT 2.2) 
4.7 The majority of education service Local Government Benchmarking
Framework (LGBF) indicators for 2020-21 show Moray has improved
performance compared to the previous year.  However the pace of
improvement has not been enough to pull Moray out of the bottom quartile for
performance in a number of indicators.  These include ACEL rates for
Numeracy across P1, P4 and P7 combined of 68%, ranking Moray 29th; the
percentage of senior phase pupils gaining 5 or more awards at Level 6
increased to 33%, behind the national average of 41%, ranking Moray 27th. 
Average tariff points achieved by leavers increased to 885, remaining well
behind the national average of 972, ranking Moray 26th; positive leaver
destination rates improved by 1% to 94.1%, however nationally the rate
increased to 95.5%, leaving Moray ranked 29th. As noted in para 4.3 above
there is a focus on raising attainment at both broad general and senior phase,
with particular attention on ACEL and Insight data to drive improvement
across attainment indicators. Evidence of improvement was highlighted to this
committee through the Initial attainment report for 2020-21, submitted to
committee on 24th November (item 7 of the agenda), with improvements noted
for cohorts across secondary schools. (Indicators CHN5, 11, 12a and 13b). 
Service Level Outcomes - successes
4.8 Moray is progressing Learning and Teaching through pedagogical
developments and digital approaches. Work continues with central officers
around Play Pedagogy and Our Moray Standard, developing a shared
standard / understanding of expectations around key areas of Learning and
Teaching.  The Pedagogical Plan for 2022-2023 is being developed, including
dedicated time at in-service for Primary schools to engage. Currently 17
schools are engaging with the Early Years Education Service teachers and
positive feedback is being received from all about personalisation of
approach. Links with the SEBN service to investigate where Play fits are also
being considered. Digital approaches to learning and teaching are being
further promoted through Digital Schools Award Scotland (DSAS), with 16
schools now having registered for the awards.  Ongoing work to promote use
of digital approaches to enhance teaching and learning are being highlighted
through Quality Assurance visits with evidence of schools building on work
undertaken during Covid-19 lockdowns.  (Actions EDU SERV LTA 2.1, 2.4
and 2.5) 
4.9 Good progress continues in the actions around Leadership and professional
development.  The redrafted Professional Learning Strategy is being
discussed with the Senior Leadership Team (SLT) and Professional Learning
and Leadership (PLL) Working Group with a finalised draft to go to the Local
Negotiating Committee for Teachers (LNCT) in June 2022 then brought to
Page 51

Page 52

Committee.  Revised GTCS Professional Standards have been shared and
plans are being drawn up to support senior staff in working with the revised
standards.  There will be a number of toolkits to support the strategy which will
provide practitioners with further information and support. (Actions EDU SERV
L3.1-3.4) 
4.10 The initial draft of the Supporting All Learners (SAL) strategy has been
presented to the core SAL Strategic group.  A second and third draft with
amendments was presented to Headteachers and Central Officers for further
consultation. Final consultation with children, young people parents and
partners will be undertaken by the core SAL strategic group members and
their departments in term 4 with a finalised version to be presented to LNCT at
the end of the term.  The strategy will then be launched in Term 1 and 2 in
session 2022-23.  A further three schools have achieved either a Gold or
Silver Rights Respecting School Award (RRSA), recognising schools work in
empowering children to promote and embed children’s rights into the ethos
and culture of their school and extending this in to the community. Currently
86% of Moray schools are engaged in the RRSA programme.  A number of
Education policies and guidelines have been reviewed and updated in line
with UN Convention of the rights of the child (UNCRC) and “The Promise”,
these include our School Child Protection Guidelines, Flexible Education
Guidance and Morays’ Anti-Bullying policy. (Actions EDU SERV SAL 4.1-4.5) 
4.11 Schools continue to be supported in preparation for HM Inspectors ‘recovery’
visits, where the focus is on the response to the impact of the COVID
pandemic and sharing emerging data / practice that can support schools in
the recovery process.  Officers are engaged in a number of working groups
locally and nationally where shared experiences and approaches in dealing
with the pandemic and supporting wellbeing for all have enabled us to
consider our next steps post pandemic. All Early Learning Centres (ELC) are
meeting legislative requirements in offering 1140 hours to families and
children of 3 and 4 year olds.  Of the 63 ELC providers 55 (87%) are meeting
national standards across Care Inspectorate quality themes.  The remaining
eight ELC providers’ not meeting standards have subsequently achieved Key
question 5 requirements at grade 4 or above. Care Inspectorate are now
resuming scrutiny across all quality themes, the eight outstanding services
would expect to be scrutinised over the course of 2022-23. (Actions EDU
SERV SELF 5.1-5.3) 
Service Level Outcomes – challenges and actions to support
4.12 Actions around the Moray Learner Pathways, BGE Curriculum development
(literacy and numeracy focus) and curricular transition approaches have not
progressed as planned due to ongoing staffing challenges within the Quality
Improvement Team.  Revised Curriculum and consortia arrangements are to
be planned following pan-authority discussions post-Insight sessions (noted in
4.3 above). These will be facilitated by the Quality Improvement Manager for
Performance and Education Scotland working in partnership to further review
timetabling structures, curriculum offer and consortia working.  The Quality
Improvement Officer for Senior Phase Curriculum post was appointed but the
candidate was successful in appointment for another Senior Leadership role
in Moray. The Curriculum post is to be reviewed and these actions have been
carried forward to the 2022-23 Service Plan.  (Actions EDU SERV C1.1, 1.2 &
1.4) 
Page 52

Page 53

4.13 Some Learning and Teaching actions around strengthening approaches to
assessment and moderation and supporting practitioner pedagogical
developments in line with GTCS standards have been delayed due to staffing
challenges.  An officer is now in post and progress is being made across
these actions including the development of Moray Moderation Guidance and
the delivery of awareness training around current pedagogical developments
that are carried forward to the 2022-23 Service Plan. (Actions EDU SERV
LTA2.2 & 2.3 Indicator CHN18) 
4.14 Initial work on strengthening Curricular Health and Wellbeing (HWB) offer
across Moray has progressed this reporting period, however the action has
been delayed due to staffing vacancies.  An officer is now in post and has
commenced reviewing the Curricular HWB offer, this includes providing
appropriate training and teaching materials.  This action will progress over
term 4 of the academic year and be reported as part of 2022-23 Service Plan.
(Action EDU SERV SAL4.2) 
5. SERVICE PERFORMANCE 
5.1  In line with the Performance Management Framework, operational
performance is reviewed quarterly by departmental management.  Areas
performing well and/or areas subject to a decreasing trend or where
benchmarking results show performance significantly below comparators will
be reported to this committee for member scrutiny.  Regular attainment
reports are presented at Committee as and when local and national data is
available. 
5.2 Initial publication of 2020-21 Local Government Benchmarking Framework
Indicators in February 2022 will be refreshed in early June.  The full suite can
be viewed within the Background Papers section of this report.  .  Published
indicators for this service have been incorporated within the relevant section
of this report depending on whether results are used to evidence progress
against strategic, service level or operational priorities. 
5.3  The narrative included is by exception, links to Service Performance
Indicators can be accessed within the Background Papers section of this
report. 
Page 53

Page 54

Operational Indicators - successes
5.4 Moray have improved or maintained performance across a number of Local
Government Benchmarking Framework (LGBF) education indicators for 2020-
21.   The percentage of adults satisfied with local schools has improved, with
the rate of satisfaction increasing to 77%, well above the national figure
(71.8%) and ranking Moray 10th overall.  The percentage of children meeting
developmental milestones (early years) continues to be high with 96%
meeting expected levels in 2020-21, exceeding the national average (85.1%)
and ranking Moray 3rd in Scotland.  (Indicators CHN10 and CHN17)  
Operational Indicators - challenges
5.5 Attainment measures for average total tariff scores for pupils in senior phase
by Scottish Index of Multiple Deprivation (SIMD) quintile, show Moray
performing below the national average in four of the five SIMD quintiles. 
Moray pupils from SIMD quintile 1 areas (20% most deprived areas in
Scotland) perform well with an average 897 tariff points achieved in 2020-21,
ranking Moray 3rd in Scotland.  However, average tariff points achieved across
SIMD quintiles 2 to 5 are below the national average, with Moray ranked in
the bottom quarter of Scottish local authorities for each SIMD quintile.  As
noted in paragraph 4.3 above, tariff points is a key priority within Curriculum
and current Insight training with education staff is focused in enhancing the
curriculum offer and maximising tariff points for all senior phase learners.
(Indicators CHN12c-f) 
6. OTHER PERFORMANCE RELATED DATA 
Complaints & MP/MSP Enquiries 
6.1 In line with the Performance Management Framework, complaints are
reviewed quarterly by departmental management in terms of time taken to
respond, outcome and learning points.  Detailed tables can be accessed
within the Background Papers section of this report. 
6.2 A total of 40 complaints were received during the second half of 2021/22 with
34 complaints closed. Of those, 24 were at frontline stage (60%), four being
upheld, three with resolution agreed and 17 not upheld. The average time to
resolve frontline complaints was 5 working days, with 15 of the 24 frontline
complaints responded within the 5 working day target. 
6.3 Due to their complexity, a number of complaints require further investigation in
order to achieve a resolution. A total of 10 investigative / escalated complaints
were closed in the second half of 2021/22, with three complaints upheld, three
partially upheld and four were not upheld. The average time taken to resolve
investigative complaints was 20 days, achieving the 20 working day target. 
Five of the complaints were resolved within the 20-day timescale, of the five
not resolved within timescale four were granted an extension. 
6.4 Complaints range across nursery, primary and secondary settings and of the
10 upheld or resolution agreed related mainly to process/procedure and staff
reinforcement. 
6.5 A total of 30 MP/MSP enquiries were received during the second half of
2021/22, with all enquiries resolved.  During the full year a total of 51 MP/MSP
complaints were received, a reduction on the 77 received in 2020/21. 
Page 54

Page 55

Other Performance (not included within Service Plan)
6.6 No information to report.     
Case Studies 
6.7 No case studies available for this report. 
Consultation and Engagement
6.8 Regular meetings of the Local Negotiating Committee for Teaching staff have
taken place as well as the Moray Parent Forum.   
7. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Performance measurement is used to ensure the efficient and
sustainable delivery of services to meet the Council’s priorities in both
the Corporate Plan and the LOIP. 
(b) Policy and Legal
The Council has a statutory requirement to publish a range of
information that will demonstrate that it is securing best value and assist
in comparing performance both over time and between authorities where
appropriate. 
(c) Financial implications
None. 
(d) Risk Implications
None. 
(e) Staffing Implications
None. 
(f) Property
None. 
(g) Equalities/Socio Economic Impact
An Equality Impact Assessment is not required as this report is to inform
the Committee on performance. 
(h) Consultations
The Head of Education (Chief Education Officer), Depute Chief
Executive (Education, Communities & Organisational Development),
Service Managers, Legal Services, the Equal Opportunities Officer, and
Lissa Rowan, Committee Services Officer have been consulted with any
comments received incorporated into this report. 
8. CONCLUSION 
8.1 As at 31 March 2021, overall progress against the service plan for
2021/22 was 65% complete, slightly behind schedule for the academic
year.  Actions subject to slippage have been impacted by staffing
challenges within the Central Team.  Outstanding actions at the end of
the academic year will be reviewed for 2022/23.
Page 55

Page 56

Author of Report: Neil Stables, Research & Information Officer
Background Papers: Service Plan Actions 
Performance Indicators
Public Performance Report 2020-21 (PDF)
LGBF Indicators
Service Complaints
Ref: SPMAN-1315769894-298
Page 56

Page 57

REPORT TO:   EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 8 JUNE 2022 
SUBJECT: EDUCATION REVENUE BUDGET MONITORING TO 31 MARCH
2022 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the budget position for Education as at 31 March
2022. 
1.2 This report is submitted to Committee in terms of Section III (A) (2) of the
Council’s Scheme of Administration relating to the consideration of capital and
revenue budgets and long term financial plans. 
2.  RECOMMENDATION 
2.1 It is recommended that Committee: 
(i) considers and notes the budget position at 31 March 2022; and 
(ii) agrees the revised carry forwards on Appendix 2 
3. BACKGROUND 
3.1 The report highlights those areas of the budget where there is a significant
percentage variance identified at 31 March 2022. 
4. BUDGET POSITION 
4.1 The spend at 31 March 2022 is £68,694,000 against a budget of £71,454,000,
giving an underspend of £2,760,000 as shown in Appendix 1. 
4.2 The main variance in Early Learning and Childcare is an underspend on the
milk and healthy snack funding.  
Item 10.*
Page 57

Page 58

4.3 The main variance in primary and secondary schools relates to devolved
school budgets comprising of £601,136 in primary schools and £805,930 in
secondary schools. As part of the Devolved School Management Scheme
schools are allowed to carry forward up to 2.5% of an underspend or a 5%
overspend on their devolved budget. At the end of the 2021/22 primary
schools had exceeded their 2.5% underspend limit by £148,728 and
secondary schools by £215,342. Due to delays in supply of IT equipment and
building works it is proposed to increase the limit of some schools for this year
only to cover these outstanding costs for orders placed during the year but not
yet received due to the impact on the supply chain from the covid pandemic.
Appendix 2 shows the original restriction to be applied to schools over the
2.5%, the adjustment to cover outstanding costs of £245, 091 and the revised
restriction to be applied. The revised restriction shows £118,979 of the school
underspends will not be carried forward but will be retained in the General
Fund. 
4.4 Education Central Services has an underspend of £28,000 on period poverty
and £12,000 on the 1+2 budget. The Pupil Equity Fund grant shows an
underspend of £1,046,000 as it is used over an academic year and so the
balance will be carried forward as an ear marked reserve. 
4.5 Staff savings from vacancies and appointment below top of scale exceed the
budget by £206,000 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement 
Plan (LOIP)
The Education Revenue Budget has particular reference to National
Outcome 8 – we have improved the life  chances for children, young
people and families at risk. 
(b)  Policy and Legal
The Council has statutory responsibilities to meet educational
needs, the needs of children and young people in need and those it
looks after. 
(c)  Financial implications
The resource implications are set out in this report and at Appendix 1
and 2. To further breakdown the £245,091 carry forward request,this is
broken down: 
Primary ICT orders   £34,347
Secondary ICT orders £55,744
Secondary Building works $£155,000 
The underspend as at 31 March 2022 is £2,760,000 against a budget
of £71,454,000. 
Page 58

Page 59

(d)  Risk implications
Budget Managers are aware of their responsibilities for managing
budget allocations and approval for any variances will be sought from
Committee in line with the Financial Regulations. 
(e)  Staffing implications
There are no staffing implications associated with this report. 
(f)  Property
There are no property implications associated with this report. 
(g)  Equalities/Socio Economic Impact
An Equality Impact Assessment is not needed because the report is to
inform the Committee on budget monitoring. 
(h)  Climate Change and Biodiversity Impacts
No climate change and biodiversity impacts arise directly from this report. 
(i) Consultations
Paul Connor, Principal Accountant and Tracey Sutherland, Committee
Services Officer, have been consulted and are in agreement with the
contents of this report where it relates to their areas of responsibility. 
6. CONCLUSION 
6.1 That Committee considers and notes the budget position as at 31 March
2022 and approves the revised school carry forwards. 
Author of Report: Vivienne Cross, Head of Education 
Nicky Gosling, Accountant 
Background Papers: with authors 
Ref:  SPMAN-1315769894-307 / SPMAN-1315769894-305 
Page 59

Page 60

Page 60

Page 61

Educational Services Appendix 1
Budget Monitoring Report to 31st March 2022
Service
Revised
Budget 
Budget to
Date 
Actual to
Date 
Variance to
Date  Variance
£'000  £'000  £'000  £'000 %
Early Learning and Childcare 3,720 3,720 3,675 45 1 %
Primary Education 28,396 28,396 27,867 529 2 %
Secondary Education 31,638 31,638 30,777 861 3 %
Education Central Services 5,149 5,149 4,038 1,111 22 %
Management 118 118 110 8 7 %
Efficiency Savings-Education 206 206 - 206 -
Education COVID 19 2,227 2,227 2,227 - -
-
Educational Services Total 71,454 71,454 68,694 2,760 -
Item 10.*
Page 61

Page 62

Page 62

Page 63

SCHOOL CARRY FORWARD BALANCES 2021-22 Appendix 2
School
Original
Carry
Forward
2021-22
2.5%
Underspend
5%
Overspend
Original
Restriction
Adjustment
to cover IT
equipment
& building
works
Revised
Restriction
Revised
Carry
Forward
2021-22
Buckie High School 104,099 112,976 104,099
Elgin Academy 103,524 135,278 103,524
Elgin High School 45,523 108,051 45,523
Forres Academy 81,059 109,307 81,059
Keith Grammar 148,010 72,896 75,115 75,115 0 148,011
Lossie High School 41,355 85,014 41,355
Milnes High School 69,152 71,790 69,152
Speyside High School 213,208 72,981 140,227 135,629 4,598 208,610
805,930 768,293 0 215,342 210,744 4,598 801,332
Cluny Primary 30,316 28,020 2,296 2,296 28,020
Cullen Primary 10,153 11,766 10,153
Findochty Primary 5,793 8,354 5,793
Millbank Primary 33,739 23,043 10,696 10,131 565 33,174
Portessie Primary 3,182 11,317 3,182
Portgordon Primary -372 5,762 -11,524  -372
Portknockie Primary 38,604 7,649 30,955 30,955 7,649
St Peters Primary 10,450 11,310 10,450
Bishopmill Primary 48,048 32,610 15,438 9,800 5,638 42,410
East End Primary 5,676 17,658 5,676
West End Primary 16,758 18,578 16,758
Seafield Primary -1,635 31,249 -62,498  -1,635
St Sylvesters Primary 9,530 12,843 9,530
Greenwards Primary -2,208 27,739 -55,479  -2,208
Mosstowie Primary 5,538 7,378 5,538
New Elgin Primary 55,603 36,622 18,980 9,752 9,228 46,374
Linkwood Primary -1,007 22,225 -1,007
Alves Primary 9,593 9,225 368 368 9,225
Andersons Primary 22,117 21,940 176 176 21,940
Applegrove Primary 24,489 27,759 24,489
Dallas Primary 941 5,628 941
Dyke Primary 2,648 8,809 2,648
Kinloss Primary 22,638 23,002 22,638
Logie Primary 1,539 5,731 1,539
Pilmuir Primary 14,958 14,717 240 240 14,717
Botriphnie Primary 4,592 3,785 807 807 3,785
Crossroads Primary 4,733 3,741 993 622 371 4,363
Keith Primary 12,758 26,805 12,758
Newmill Primary 7,500 7,984 7,500
Rothiemay Primary 11,081 7,003 4,079 1,974 2,105 8,977
St Thomas Primary 6,244 7,471 6,244
Burghead Primary 7,973 12,804 7,973
Hopeman Primary 6,238 17,708 6,238
Hythehill Primary 11,685 28,179 11,685
St Gerardine Primary 29,111 28,460 651 651 0 29,111
Lhanbryde Primary -6,333 18,263 -36,525  -6,333
Milnes Primary 9,715 18,375 9,715
Mosstodloch Primary 39,281 17,017 22,264 160 22,104 17,177
Aberlour Primary 2,877 12,881 2,877
Craigellachie Primary 4,495 5,433 4,495
Glenlivet Primary 30,466 4,790 25,676 25,676 4,790
Knockando Primary 5,615 6,382 5,615
Mortlach Primary 19,031 13,880 5,151 286 4,865 14,166
Rothes Primary 14,000 10,452 3,547 3,547 10,452
Tomintoul Primary 12,982 6,571 6,411 971 5,440 7,542
601,136 688,918 -166,026 148,728 34,347 114,381 486,755
Retained in General Fund 118,979
Item 10.*
Page 63

Page 64

Page 64

Page 65

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 8 JUNE 2022 
SUBJECT: EXPANSION OF MUSIC INSTRUCTION SERVICE 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To provide Committee with a further update on proposals regarding the
expansion of the Moray Music Instruction Service. 
1.2 This report is submitted to Committee in terms of Section III (D) (1) of the
Council's Scheme of Administration relating to all the functions of the Council
as an Education Authority. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee:- 
(i) Consider and note the outcomes of the consultation with children
and young people and their families and carers to determine
demand across a number of different musical instruments; 
(ii) Determine whether to recommend to Corporate Committee on 14
June 2022 to allocate the additional funding of £35,000 from the
Scottish Government towards an expansion of music making
opportunities across Moray for academic year 2022/23. 
(iii) If the decision is to recommend the allocation of the additional
funding to the expansion of music making opportunities, make
recommendations regarding how the funding should be utilised. 
(iv) Agree to defer any further decisions on the expansion of the
Music Instruction Service until the long-term funding position is
known.
Item 11.*
Page 65

Page 66

3. BACKGROUND 
3.1 In 2021, the Scottish Government agreed to remove fees for instrumental
music tuition in schools for 2021/22.  Ministers and COSLA Leaders agreed to
the initial one-year removal of fees through supported funding from the
Scottish Government to allow existing levels of provision to be maintained in
the academic year. 
3.2 The funding for each Local Authority was based on the school roll, however it
was acknowledged that this approach could leave some authorities with an in-
year budget deficit as they were expecting to charge for this tuition.  To this
end, it was agreed that certain authorities would receive ‘top up’ funding to
ensure that no cost would be associated with any part of an individual’s music
lesson. 
3.3 On 14 July 2021 the Council received confirmation from the Scottish
Government of one year removal of fees. The funding for 2021-22 was
intended to see the pre-pandemic level of provision in local authorities
sustained at no cost to families. The funding did not allow for any expansion of
the service either by increasing pupil numbers or by expanding the service
offer. 
3.4 On 15 February 2022 the Council received notification of funding for the
continued removal of instrumental music tuition fees for the academic year
2022-23, while the Scottish Government continues to work with local
authorities to develop a model for a long-term sustainable music tuition
service, which includes sustainable funding arrangements. The funding
allocated this year allows for some expansion of music services within local
authorities in line with the overarching ambition for increased provision. In
Moray there is £35,000 available for potential expansion. This additional
funding will be paid as redetermination to the General Revenue Grant at the
end of March 2023, therefore a decision is required regarding the allocation of
funds. As there is still work ongoing regarding the impact and broader
implications of the free music tuition policy, it is currently assumed that this
additional funding is for one year only. 
3.5 The Council Music Tuition and Performance Team is currently delivering
brass, strings, woodwind and percussion tuition to 662 children and young
people across 48 primary and secondary schools. There are 149 children and
young people on a waiting list connected to our current instrument offering. 
3.6 At its meeting on 24 November 2021, Education, Children’s and Leisure
Services Committee agreed to consult with children/young people and their
families and carers to determine demand across a number of different
instruments to inform potential service expansion (para 13 of the minute
refers).
Page 66

Page 67

3.7 Analysis of the consultation is contained in Appendix 1, however a summary
of the findings is as follows; 
- 406 responses to the surveys from children and young people,
parents/carers, Headteachers and Principal Teachers of Music.
- Guitar, piano, bagpipes, drumming and voice were the most requested
instruments/areas for potential expansion
- Highly valued service currently and support for expansion opportunities
and being universally available to all pupils
- Importance of marketing/communication in regards to this learning
opportunity 
3.8 Members also agreed on 24 November 2021 to further consider investment in
a Moray Music Fund and to defer a decision on longer term expansion of the
music service and the inclusion of Pipes and Drums tuition until such time as
the consultation had taken place and the funding positions had been clarified. 
3.9 At this stage the longer-term funding arrangements for music tuition are still
unclear, and a sustained expansion of the service would not be possible
unless Moray Council were to commit additional funds. If Members were
supportive of allocating the additional 2022-23 budget to support the vision of
an expanding music instruction service the options for consideration would
therefore include: 
a. Allocating the £35,000 (or a proportion thereof) to a Moray Music Fund
open to all eligible groups through a bidding process. The fund would be
open to pipes and drums and other music groups. If Members were
interested in this approach they could remit to the Head of Education
Resources & Communities to develop eligibility criteria for a Moray Music
Fund based on the fulfilment of agreed educational and cultural priorities. 
b. Allocating the funding to the Music Instruction and Performance team to
develop project based music opportunities that would enable the team to: 
- support the 149 children and young people currently on the music
instruction waiting list by providing to opportunities to start learning a
musical instrument;
- focus these opportunities on new instruments for the team (piano, guitar
(including ukulele), bagpipes, drumming and voice) in response to the
demand that is evident through the consultation;
- work with freelance practitioners to help deliver these project based
opportunities;
- develop wider collaborations with music making organisations in Moray
and the wider region;
- purchase more equipment and materials to enable more learners to
become involved in music making. 
The project based approach is the recommended option as it would ensure
our Music Instruction and Performance team is better prepared for expansion
once the longer-term funding model is known and understood. 
Page 67

Page 68

3.10 Council Officers have been evaluating the impact of the free music tuition
policy, and a summary of the findings are set out below; 
- There was a large increase in the number of applications for music tuition
at the start of the 21/22 academic year (which is reflected in the large
waiting list).
- Instructors have reported an increase in non-attendance at lessons
throughout the academic year – mixture of Covid absence and lack of
interest (possible exacerbated by the removal of charges). We intend to
address this in 2022/23 academic year by setting out minimum attendance
criteria that will be shared with parents/carers;
- A number of learners who would have previously been unable to apply for
music instruction due to the cost barrier are truly benefitting from this
provision and making promising progress and making the most of the
opportunity. 
3.10 The Music Instruction and Performance team in conjunction with the Research
and Information team are currently undertaking some analysis work to
determine whether free access to music tuition has resulted in learners from
lower SIMD areas and/or families on low income applying for this opportunity. 
The outcomes of this analysis will be reported back to the Scottish
Government and will be used for future planning purposes. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
In relation to the LOIP, this report supports three of the main priority
areas which are building a better future for our children and young
people in Moray, empowering and connecting communities and
improving the wellbeing of our population. 
In relation to the Corporate Plan, this report contributes to three of the
main priority areas which are providing opportunities for people to be the
best they can be throughout their lives with a strong and sustained focus
on those individuals and groups in our society who experience the most
disadvantage and discrimination, empower and support communities to
build capacity and creating a sustainable council that provides valued
services to our communities. 
(b) Policy and Legal
There are no policy of legal implications arising directly from this report. 
Evidence demonstrates that music education can improve attainment for
all learners particularly around numeracy, literacy and cognitive function.
Music education also helps to develop life lessons such as social and
personal development skills.
Page 68

Page 69

(c) Financial implications
As per financial regulations 2.16 any additional funding from the Scottish
Government from a redetermination of General Revenue Grant must be
approved at Service Committee followed by Corporate Committee. 
If Members choose to recommend the allocation of the additional funding
to a Moray Music Fund or to the Music Instruction and Performance
team it will be utilised to support a short term fund or project based
opportunities and there is therefore no long term financial commitment
by the Council. 
(d) Risk Implications
There are no risk implications arising directly from this report. 
(e) Staffing Implications
There are no staffing implications arising directly from this report. 
(f) Property
There are no property issues arising directly from this report. 
(g) Equalities/Socio Economic Impact
An expansion of the Music Instruction and Performance team in line with
our Corporate and LOIP priorities would enable the service to contribute
to reducing inequalities of outcome caused by socioeconomic
disadvantage. 
(h) Climate Change and Biodiversity Impacts
No climate change or biodiversity implications have been determined for
this report because at this stage acceptance of additional funding has
still to be confirmed.  However Officers will ensure that if approval is
granted any project based expansion work will adhere to the Council’s
climate change commitments and this would be included in any
partnership/procurement discussions. 
(i) Consultations
The Head of Education, Head of Education Resources and
Communities, Principal Teacher of Music Instruction and Performance,
the Legal Services Manager,  Tracey Sutherland, Committee Services
Officer, Nicky Gosling, Accountant, the Human Resources Manager and
the Equal Opportunities Officer have been consulted and the comments
received have been incorporated into the report. 
5. CONCLUSION 
5.1 That the Committee notes the outcomes of the music instruction
consultation and determines whether to recommend to Corporate
Committee to allocate the additional temporary funding from the
Scottish Government to either a Moray Music Fund or to short-term
music instruction projects. 
Page 69

Page 70

Author of Report: Kim Slater, Sport and Culture Service Manager
Background Papers: 
Ref:    SPMAN-9425411-10
SPMAN-9425411-11
Page 70

Page 71

Appendix 1 
Instrumental Music Tuition Funding Allocation - Analysis of Music Instruction Expansion Surveys
1. Children & Young People Survey Analysis
83 children and young people responded
1. Do you currently receive lessons on an instrument delivered by a Moray Council Music
Service instructor?
Yes – 33
No – 50 
2. Was this the instrument you wanted to learn?
Yes – 26
No – 7 
3. Please tell us which instrument you wanted to play and why this is not the instrument you
are learning.
Guitar
Drums x 2
Violin x 3
Flute
I didn’t really want to learn any instruments 
4. Do you currently receive lessons on an instrument delivered by a private music instructor?
Yes – 21
No – 29  
5. Please tell us which instrument you are learning.
Chanter/Pipes x 7
Piano x 4
Guitar x 5
Singing 
Drums x 2
Clarinet
Flute
Tuba 
Violin 
6. Do you attend a Moray Music Centre ensemble or a privately run ensemble?
Yes – 24
No – 55  
Item 11.*
Page 71

Page 72

7. If yes, please tell us which one.
Pipe Band - 7
Moray Music Centre - 8
School – 7
Strathspey Fiddlers – 1
Private - 2 
8. Instruction on the following instruments is currently on offer (strings, woodwind, brass,
percussion) – do you feel the current offer is enough? 
Yes – 22
No – 61 
9. If the Music Service were to offer instruction on additional instruments, which
instrument(s) would you like to learn?
Piano – 47
Guitar – 40
Bagpipes and Drumming – 37
Voice – 27
I’m happy with the instrument I am learning - 14
Cello – 11
Other – 3 
Carribbean kettle drum, percussion, electronic/electric guitar 
Drums 
Flute 
10. Please add any additional comments you wish to share in relation to the current
instrumental offer or a potential expansion of the Music Instruction & Performance team
• Really like my lessons x 3
• Love music centre (playing in a band) x 2
• Would save my parents money if bagpipe tuition was free – playing this instrument
for my exam
• Music lessons are too expensive for working parents via school – cheaper to pay
private tuition
• Should be free for all and open to all (it’s the universal language of mankind)
• Should be allocated on the basis of natural/initial talent
• Younger age groups should be offered
• Not all instruments offered at my school
• Lucky my parents can afford it, many families can’t
• Don’t know what is on offer  
Page 72

Page 73

2. Parent/Guardian Survey Analysis
286 responses to survey
1. Do you have a child learning an instrument with a Moray Council Music Service instructor?
Yes – 88
No – 198
2. Which instrument do they learn?
Brass – 18
Woodwind – 21
Upper Strings – 43
Percussion – 6
3. Do you have a child learning an instrument with a private music instructor?
Yes – 61
No – 130 
4. Please tell us which instrument your child is learning?
Piano – 22
Chanter/Pipes – 17
Drums – 10
Guitar – 9
Keyboard – 5
Ukulele – 4
Violin – 4
Voice – 3
Cello – 2
Clarinet – 1 
5. Do you have a child attending a Moray Music Centre ensemble or a privately run
ensemble?
Yes – 31 (Moray Music Centre, Pipe Band, School)
No – 100 
6. Instruction on brass, woodwind, upper strings and percussion is currently on offer – do
you feel the current offer is sufficient? 
Yes – 120
No – 166 
7. Please give some detail as to why you think the current offer is not sufficient.
• Restricted options – 102
• Need instrument with Scottish heritage – 21
• Never been offered - 11
• Not enough spaces – 10
• Options old fashioned – 5
• Not given choice they wanted – 5
• More traditional instruments – 5
Page 73

Page 74

• Child interested in other instruments – 5
• Affordable instruments required – 4
• Ability to take exams in wider options – 1
• Lack of follow on – 1
• Taster sessions before they choose option – 1
• More lessons (twice per week) – 1
• Not consistent offering across schools – 1 
8. If the Music Service were to offer instruction on additional instruments, which instruments
would you like to see offered to children and young people in Moray?
Piano – 214
Guitar (including ukulele) – 210
Bagpipes and drumming – 187
Voice – 130
Cello – 60
Other – 25 
Recorder/sing/percussion 
Bass guitar/guitar 
Banjo 
Trumpet 
Tin whistle 
Drums – 5 
Keyboard – 3 
Violin – 2 
Harp – 2 
Flute 
Saxophone – 2 
Accordion 
9. Please add any additional comments you wish to share in relation to the current
instrumental offer or a potential expansion of the Music Instruction & Performance team.
• Positive move to expand – good planning and liaison needed
• Group lessons in Primary a great success
• Lucky to have team of high quality instructors in Moray
• Importance of music – confidence, bonding, well-being, future opportunities,
expression, rhythm, co-ordination
• Wider choice = more desire from pupils
• Learning songs that interest the pupils
• Cost before ‘free’ was prohibitive
• Lack of awareness/advertising/inclusivity/communication re this offering from
schools
• Not enough teachers employed
• If expanding instructors need proper qualifications – same as current level
• Ability to start young to achieve necessary standard once at exam stage
• Some schools no music provision/lack of equity
• Appreciation of what is currently offered
• Communication between parents/guardians and instructor would be good
Page 74

Page 75

• Bagpipes essential to our Scottish culture
• Option of additional private tuition with instructors
• Current process (‘test’) to choose those to offer unfair
• Pupils attending music lessons should not consistently miss lessons on same subject
• Working towards a performance for parents would be good
• Should be universal to all
• If interest spread across schools – option to offer in central place after school?
• Music instruction helping child with other struggles in school
• Teach children how to write their own music
• ‘Well to do’ schools seem to get plenty provision – schools with high need
demographic get less
• Ridiculous every child gets given a recorder when the majority have no interest in
the instrument
3. Headteacher and Principal Teacher of Music Survey Analysis
37 responses to survey
1. Instruction on the following instruments (brass, woodwind, upper strings, percussion) is
currently on offer – do you feel the current offer is sufficient? 
Yes – 9
No – 28 
2. Please give some detail as to why you think the current offer is not sufficient.
• Wider variety (and availability) that appeal to pupils and allow them to excel beyond
the broad general education x 3
• Guitar and piano very popular so some need to get private tuition as not enough
instructors in schools (excludes those that cannot afford it) x 5
• Guitar not included x 2
• Some of the instruments do not offer enough scope to develop instrumental skills in
other areas
• Gender imbalance in pupils – boys prefer percussion/guitar but with guitar not
included this results in smaller number of boys learning music
• Not even aware the above was on offer x 3
• Bagpipes, guitar, voice and piano x 5
• Violin
• Lower strings
• Include popular/traditional instruments – bodhran, guitar and chanter
• Violin, accordion, piano, keyboard 
• Bagpipes x 4
• Instruments available only useful if you intend to play in an orchestra – would like to
see more standalone instruments – piano, guitar, bagpipes
• Music taught earlier  
Page 75

Page 76

3. From a Head Teacher/Principal Teacher of Expressive Arts perspective, would specialist
instruction on any of the following instruments be beneficial to the children and young
people at your school?
Piano – 30
Guitar (including ukulele) – 30
Bagpipes and Drumming – 29
Voice – 27
Cello – 14
Other – 2 
Keyboard 
Double bass 
4. Does your school offer music instruction delivered by a private instructor or external
agency?
Yes – 8
No – 29 
5. Please detail the instruments offered and/or external agencies involved.
Piping and drumming - 4
Drum – 3
Guitar – 3
Voice - 1
Keyboard – 1 
6. Please add any additional comments you wish to share in relation to the current
instrumental offer or a potential expansion of the Music Instruction & Performance team.
• Increased violin capacity. 
• Children really enjoy their music lessons so would like to encourage more
opportunities x 4
• More performance opportunities for non-orchestral players
• Real concern on the concept of offering access to paid private instruction in school –
equity issue
• Offered to all from a young age – integral part of curriculum x 2
• Children actually getting their choice and not 2nd or 3rd option
• Previously offered private guitar tuition – would like to resume but not as a private
provider
• Fantastic that it is now a free service, wider scope rather than traditional orchestral
ones 
• Pipes, drums, guitar and piano need to be offered – orchestral learners have
plummeted 
Page 76

Page 77

REPORT TO:   EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 8 JUNE 2022 
SUBJECT: EDUCATION RESOURCES AND COMMUNITIES AND
EDUCATION CAPITAL BUDGET MONITORING REPORT 31
MARCH 2022  
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 This report is to inform Committee of projects actual expenditure for Capital
Budgets within Education, Children’s and Leisure Services for 2021/2022.  
1.2 This report is submitted to Committee in terms of Section III (A) (2) of the
Council's Scheme of Administration relating to the consideration of Capital
and Revenue Budgets and long term financial plans. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee scrutinises and notes the
contents of the report. 
3. BACKGROUND 
3.1 It is the practice of this Committee to receive regular reports both providing an
update on the current financial position of the capital programme and seeking
approval to implement projects when they arrive at a suitable point of
development. 
3.2 At the meeting of the Moray Council on 3 March 2021 (paragraph 2 of the
minute refers) Council approved the Capital Plan for 2021/22. At the meeting
of the Moray Council on 30 November 2021 (paragraph 7 of the minute refers)
Council approved carry forwards for Budgets within Education. 
3.3 The capital budgets covered in this report and a list of the major projects from
this financial year are contained within the Education Resources and
Communities and Education Capital Plan under APPENDIX I. 
Item 12.*
Page 77

Page 78

4. BUDGET FOR 2021/22 
4.1 The total approved Capital Budget for Education Resources and Communities 
and Education for financial year 2021/22, including carry forwards from 
2020/21, is as follows:- 
20/21
£000
Land & Buildings 9,655
Vehicles, Plant &
Equipment
281
Totals 9,936 
4.2 Actual expenditure up to 31 March 2021 is £10,038m. 
5. MAJOR PROJECTS 
Schools Essential Maintenance Programme 2021/22
5.1 The total budget for this programme of work is £4.655m which is made up of a
carry forward of £1.655m from last year and £3m from 2021/22 Capital Plan.
This programme of work is a single line within the Capital Plan.  However, the
programme has been split into separate budgets for each individual project as
detailed in APPENDIX I for budget monitoring purposes. The majority of this
work programme is the phased work begun under the Make Do and Mend
criteria, which was to address elements of schools in Condition D that have
the possibility of failing. The scope of each of the projects is developed in
consultation with the school and the contractor. The reactive nature of this
programme does mean that individual project budgets do vary during the year
of the programme. 
5.2 The total spend for this programme of work during 2021/22 was £4.447m. The
underspend was mainly due to the delays to the Burghead Primary School
heating and pipework replacement and Milnes High School roofing upgrade
projects. Following condition reports by the Maintenance team of failing
building elements at Mosstodloch Primary School, Speyside High School,
Aberlour, East End Primary School, Elgin, Millbank Primary School, Buckie
and Seafield Primary School, Elgin design work was undertaken to minimise
the budget underspend. 
5.3 Work to upgrade the mechanical and electrical systems at Speyside High
School, Aberlour, Cluny Primary School, Buckie, Forres Academy, New Elgin
Primary School, Elgin, and Anderson Primary school, Forres was completed
during the school summer holidays. 
5.4 Work to replace the heating system at Burghead Primary School was unable
to progress while discussions were ongoing with a local distillery to establish if
waste heat from the facility could be used at the school. To allow the pipework
replacement to begin, the heat source needed to be known because the lower
temperature of the waste heat directly affects radiator sizes. Those
discussions were concluded in October 2021 and the heating option appraisal
has now been updated. 
Page 78

Page 79

5.5 Work to replace roofing at Milnes High School, Fochabers was delayed
following a detailed inspection which revealed a greater extent of roof
replacement being required and a 20% increase in material prices particularly
for roof insulation. The extent of work required to replace the roof while the
school remains operational requires a detailed project plan to be produced
and agreed. 
5.6 Work to upgrade the drainage systems at Andersons Primary School, Forres,
Forres Academy and Applegrove Primary School, Forres were completed
during the school summer holidays. 
5.7 Work to replace defective render with a new insulated render system at
Hythehill Primary School, Lossiemouth was completed on 28 April 2022, five
weeks after the previously stated completion date of 25 March 2022. Work
had been delayed on site because of adverse weather conditions and the
availability of skilled workforce. There has been an overspend of £161k as a
result of unforeseen work. This included the condition of the light fittings and
fixings which, when removed, could not be reattached to the new wall surface. 
There were considerable areas on the three-storey block which were out of
level that needed additional work to square off the surfaces, and an out
building was damaged by fire in a bin area. 
6. NEW BUILD (SCHOOLS)
Lossiemouth High Replacement Project
6.1 The final phase of the project was completed on 21 April 2022 including the
artificial pitch and new pedestrian access footpath, five weeks behind the
revised completion date of 21 March 2022. 
6.2 Lossiemouth Community Council have been in communication with Officers to
raise concerns regarding the remoteness of the public car park to the
entrance of the Community facilities. Following completion of the new
pedestrian access footpath, which has shortened the route to the main
entrance, Officers will meet with the Community Council to seek their
feedback. 
6.3 COVID-19 costs have been agreed with the contractor and submitted to the
Scottish Government as indicated in previous reports to this Committee. The
Scottish Government have acknowledged receipt of our documentation and
had indicated that a decision may be made before the end of the 2021/22
financial year. Currently the Scottish Government continue to review the
claim. 
Linkwood Primary School, Elgin
6.4 COVID-19 costs have been agreed with the contractor and submitted to the
Scottish Government as indicated in previous reports to this Committee. The
Scottish Government have acknowledged receipt of our documentation and
had indicated that a decision may be made before the end of the 2021/22
financial year. Currently the Scottish Government continue to review the
claim. 
Page 79

Page 80

6.5 The Scottish Government are not funding the project, but have been provided
with the agreed COVID-19 costs to determine if they will contribute to the
costs. 
Findrassie Primary School, Elgin
6.6 Stakeholder consultation on the project within the Elgin Academy ASG has
completed. Consultations with both educational and community users was
concluded during February 2022. Procurement options are currently being
evaluated with the Scottish Procurement Alliance and Hubco North. The time
required to recruit the Project Manager (Learning Estate) and arrange the
consultation process has delayed expenditure on professional fees during
2021/22. The balance of this unspent budget will form a carry forward request
to the Moray Council meeting 29 June 2022. 
7. EARLY LEARNING CHILDCARE EXPANSION
7.1 The Early Learning Childcare (ELC) Capital Programme includes 4 new build
nurseries and 7 refurbishments. The completed projects are as follows: 
• Lady Cathcart, Buckie;
• Lhanbryde Primary;
• Burghead Primary; 
• New Elgin Primary, Elgin;
• Cullen Nursery; 
• Mortlach Primary, Dufftown;
• Linkwood Primary School, Elgin; 
• Pilmuir Nursery, Forres;
• Strathisla Nursery Keith; and
• Mosstodloch Primary. 
Aberlour Primary School Nursery
7.2 Planning and Listed Building Consent has been approved to carry out a full
refurbishment and extension to the existing nursery. Temporary decant
accommodation has been manufactured for both the school and private
nursery. The intention was that the school nursery be decanted to
accommodation on the primary school site and the private nursery to a site
adjacent to Speyside High School. Meetings have been held with the Head
Teachers at Speyside High School and Aberlour Primary School and further
options for the location of the temporary units are being considered. The
programme of work at Aberlour has been paused in order to carry out option
appraisals at each school which have been considered by the ELC Project
Board and Asset Management Working Group. Further information is being
gathered before being reported to this Committee. 
7.3 The ELC Capital Programme for 2021/22 was funded by the transfer of
Scottish Government revenue funding to the Capital Plan for the construction
and refurbishment of nursery facilities. The Capital allocation for the 2021/22
programme is overspent by £1,198k with no remaining revenue budget
available to fund the shortfall. The budget pressures within the ELC Revenue
budget and the Internal Audit investigation into the management of the ELC
budgets was reported to this Committee on 9 March 2022 (paragraph 14 of
the draft minute refers).   
Page 80

Page 81

8. LEISURE AND LIBRARIES 
Condition Surveys – Other Leisure Facilities
8.1 The condition surveys of our leisure facilities were delayed due to specialist
contractor availability. The survey work has now concluded, with condition
survey reports due in June 2022. 
8.2    Underwater Swimming Pool Camera Replacements 
Pool camera replacements at Buckie, Forres and Keith have now been
completed. 
9. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)).
This report supports the Council’s corporate working principles of
efficiency, effectiveness and economy. 
(b) Policy and Legal
Future programmes of work funded from the Capital Programme will
require policy decisions to help inform how schools projects will be
prioritised and in the case of refurbishments, to what standard. 
(c) Financial Implications
The Report sets out the following financial implications of; uncertainty
of receiving funding from the Scottish Government to support the
COVID costs of the Lossiemouth High School and Linkwood Primary
Schools; a potential carry forward request for the new Findrassie
Primary School project; and the overspend in the Early Years Capital
budget. 
(d) Risk Implications
The school estate (excluding new build) continues to deteriorate.  The
level of investment that the Council is able to afford is insufficient to
maintain all schools to B/B standard. The risk of building failures,
temporary closures and/or health and safety risks continue to be a
concern. The programming of work within schools is subject to change
as government guidance is issued in relation to COVID-19 restrictions.
The latest construction sector guidance is indicating that manufacturing
lead in times and costs for building products are increasing rapidly due
to the effects of COVID restrictions, Brexit and the conflict in Ukraine.
This will, in turn, impact tender prices received for construction
projects, therefore additional budget may be required for projects after
they return from tender or projects postponed. 
(e) Staffing Implications
There are no staffing implications associated with this report. 
(f) Property
There are no property implications other than those detailed in the
report.  
Page 81

Page 82

(g) Equalities/Socio Economic Impact
There are no equalities or socio economic implications associated with
this report. 
(h) Climate Change and Biodiversity Impacts
Where heat source replacements are planned a Heating Option
Appraisal in accordance with current procedures will be carried out that
includes renewable heating options. Where wall or roof replacements
are programmed additional insulation to improve the performance of
the fabric will be considered. 
(i) Consultations
Consultations have been undertaken with Head of Financial Services;
Principal Accountant; Property Asset Manager; Design and
Construction Manager; Legal Services Manager; PPR and
Communications Officer; Equal Opportunities Officer; Head of
Education Resources and Communities, Head of Education and
Tracey Sutherland (Committee Services Officer).  Where comments
have been received, these have been included within the report. 
10. CONCLUSION
10.1 This report presents the Education Capital Works budget to 31 March
2022.  It clarifies the status of a number of capital projects and the
financial implications associated with each of them where appropriate. 
Author of Report:  Moray Macleod, Design and Construction Manager
Background Papers:  Education Capital Budgets 2021/2022
Ref:  SPMAN-1285234812-1084 
Page 82

Page 83

REPORT TO:   EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 8 JUNE 2022   
SUBJECT: EDUCATION RESOURCES AND COMMUNITIES REVENUE
BUDGET MONITORING TO 31 MARCH 2022 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the budget position for Education Resources and
Communities as at 31 March 2022. 
1.2 This report is submitted to Committee in terms of Section III (A) (2) of the
Council’s Scheme of Administration relating to the consideration of capital and
revenue budgets and long term financial plans. 
2.  RECOMMENDATION 
2.1 It is recommended that Committee scrutinises and notes the budget
position at 31 March 2022. 
3. BACKGROUND 
3.1 The report highlights those areas of the budget where there is a significant
percentage variance identified at 31 March 2022. 
4. BUDGET POSITION 
4.1 The spend at 31 March 2022 is £20,833,000 against a budget to date of
£21,777,000, giving an underspend of £944,000 as shown in Appendix 1.  
4.2 The COVID-19 pandemic has had a significant impact on income and a
£500,000 reduction in the income budget for leisure facilities was approved as
part of the budget report to Moray Council 3rd March 2021. With this saving
implemented there was an underspend of £33,000 on leisure income. 
4.3 There is an overspend on school repairs and maintenance and accessibility of
£236,000, this is partly due to additional repairs following storm Arwen. 
Item 13.*
Page 83

Page 84

4.4 Other underspends within the service are Additional Support for Learning
training £23,000, home tuition £43,000, Speech and Language Therapy
contract £65,000 and staff travel across the service £53,000. 
4.5 Staff savings from vacancies and appointment below top of scale have
exceeded the budget by £986,000 (4.8% of service staff budget). The staff
savings are across the service, with the largest proportion (59%) relating to
ASN positions centrally and within schools (including ASN teaching staff and
PSAs) where there has been normal staff turnover, some posts have proven
difficult to fill, and other centrally managed posts have been held as they
under review as part of the wider review of ASN Services. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement 
Plan (LOIP) 
The Education Resouces and Communities Revenue Budget has 
particular reference to National Outcome 8 – we have improved the life 
chances for children, young people and families at risk. 
(b)  Policy and Legal
The Council has statutory responsibilities to meet educational
needs, the needs of children and young people in need and those it
looks after. 
(c)  Financial implications
The resource implications are set out in this report and at Appendix 1.
The underspend as at 31 March 2022 is £944,000 against a budget of
£21,777,000. 
(d)  Risk implications
Budget Managers are aware of their responsibilities for managing
budget allocations and approval for any variances will be sought from
Committee in line with the Financial Regulations. 
(e)  Staffing implications
There are no staffing implications associated with this report. 
(f)  Property
There are no property implications associated with this report. 
(g)  Equalities/Socio Economic Impact
An Equality Impact Assessment is not needed because the report is to
inform the Committee on budget monitoring. 
(h)  Climate Change and Biodiversity Impacts
No climate change and biodiversity impacts arise directly from this
report.  
Page 84

Page 85

(i) Consultations
Paul Connor, Principal Accountant and Tracey Sutherland, Committee
Services Officer, have been consulted and are in agreement with the
contents of this report where it relates to their areas of responsibility. 
6. CONCLUSION 
6.1 That Committee scrutinises and notes the budget position as at 31
March 2022. 
Author of Report: Joanna Shirriffs, Head of Education Resources and
Communities 
Nicky Gosling, Accountant 
Background Papers: with authors 
Ref:    SPMAN-9425415-16/SPMAN-9425411-16 
Page 85

Page 86

Page 86

Page 87

Education Resources & Communities Appendix 1
Budget Monitoring Report to 31st March 2022
Service
Revised
Budget 
Budget to
Date 
Actual to
Date 
Variance to
Date  Variance
£'000  £'000  £'000  £'000 %
Communities 1,008 1,008 985 23 2 %
Culture, Sport & Leisure 3,787 3,787 3,743 44 1 %
Learning Estate 147 147 126 21 14 %
Additional Support Needs 13,712 13,712 13,593 119 1 %
Business Support Unit 1,401 1,401 1,399 2 -
Education Resources & Communities Management 106 106 106 - -
Schools Repairs & Maintenance 1,066 1,066 1,302 (236) (22)%
Public Private Partnership (582) (582) (572) (10) 2 %
Education Resources 115 115 116 (1) (1)%
Education Resources & Communities COVID-19 31 31 35 (4) (13)%
Education Resources & Communities Efficiency
Savings 986 986 - 986 -
-
Education Resources & Communities
Total 21,777 21,777 20,833 944 -
Item 13.*
Page 87

Page 88

Page 88

Page 89

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 8 JUNE 2022 
SUBJECT: PERFORMANCE REPORT (EDUCATION RESOURCES AND
COMMUNITIES) – PERIOD TO MARCH 2022 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the performance of the service for the period to 31
March 2022. 
1.2 This report is submitted to the Committee in terms of section III (D) (1) of the
Council’s Scheme of Administration in relation to the functions of the Council
as an Education Authority. 
2. RECOMMENDATION 
2.1 It is recommended that Committee: 
i) scrutinises and notes performance in the areas of Service 
Planning, Service Performance and other related data to the end 
of March 2022; and 
ii) notes the actions being taken to improve performance where 
required. 
3. BACKGROUND 
3.1 On 7 August 2019, the Council, approved a revised Performance
Management Framework for services (para 5 of the minute refers).   
4. SERVICE PLANNING 
4.1 Each service plan sets out the planned strategic and service level priorities
and outcomes it intends to deliver in the coming year aligning closely with
financial planning, corporate and community planning partnership strategic
priorities. This report provides an interim update on progress on the service
plan, key outcomes and performance indicators.   Committee is invited to
review progress to secure assurance that is satisfactory and to provide
scrutiny and further direction where performance requires attention.
Item 14.*
Page 89

Page 90

4.2 The narrative included is by exception, links to Service Plan Actions and
Performance Indicators can be accessed within the Background Papers
section of this report. 
Figure 1   
Strategic Outcomes - successes
4.3 Developing engagement with the public on the future of council services has
made good progress in the second half of 2021/22. Suggestions raised at the
‘Power to the People’ session hosted by tsiMoray are to be incorporated into
refreshed Community Planning Partnership (CPP) Community Engagement
Strategy. Following elections Community Councils are now operational with
members completing a survey shaping augural meetings and identifying
ongoing training needs. A programme of training is being planned for 2022/23.
An engagement event was held in Buckie in March, the outcome of which is a
commitment to re-establish the Moray Transport Forum. (Action STRATEGIC
ERC 2.1) 
4.4 The development of locality engagement has progressed well with work
ongoing within five identified areas at varying stages of development.
Engagement in the Buckie and New Elgin areas has been ongoing for several
years supported by the community Support Unit (CSU). As a result of a
Development Trust Association Scotland meeting held in February
discussions are underway to explore establishing a development trust for
Buckie. The consultation of local priorities in Buckie has been analysed and
the provision of support to existing activities and matters arising will be
progressed in consultation with the Community Planning Partnership. In New
Elgin the working group have revised their Locality Plan to clearly identify the
four main themes and will move forward with the delivery of actions within
these themed areas. Both Buckie and New Elgin areas have identified the
RAG
Empowering and connectiong communities 65%
Improve our understanding of the issues in our
communities based on the experience of local
people
72%
A Sustainable Council: that provides valued
services to our communities 71%
RECOVERY Empower and support communities to build
capacity 85%
Ensuring Digital ways of working are embedded
across our teams, maximising connectivity,
collaboration and online service delivery
81%
Restructure of service management to meet
demands of the service 100%
Community Learning and Development 100%
83%OVERALL PLAN PROGRESS
Comment
Data not available - Data not yet published or unavailable due to reporting
timescales.
STRATEGIC
SERVICE
Progress is measured over the 4-year plan period. At the end of Q4
2021/22 the overall plan is slightly behind target with four Actions behind
completion timescales.
SERVICE PLAN PRIORITIES
0
2
4
4
1
SERVICE PLAN PI'S
Achieving Target Within Target
Below Target Data Only
Data not available
11
Page 90

Page 91

need for community spaces where partners and community residents can
meet, options are being explored in Buckie, at present however no
appropriate space has been sourced. The other three areas (Lossiemouth,
Forres and Keith) are at earlier stages in the eight-stage process, good
progress has been made in all three with support from the CSU. (Action
STRATEGIC ERC 2.2) 
4.5 In February 2022 the Transform Learning Board approved the closure of the
Leisure Services Review. Significant progress has been made in the delivery
of a more efficient and effective leisure estate. This has been achieved with
the strategic group working closely together, driving forward the
implementation of a Business Plan and developing shared service delivery
opportunities and an improved commercial approach to the service as well as
being responsive to customer needs. (Action STRATEGIC 3.2, PI’s SCC1,
SCC2) 
Strategic Outcomes – challenges and actions to support
4.6 Whilst good progress has been made during quarter 4 the target completion
date for Community Asset Transfer (CAT) has not been met. Of the target of
eight transfers three completed during 2021/22. The COVID pandemic
severely hindered the processes for progressing transfers as planned. A
revised Allotments Policy was passed at Corporate Committee on 15 March
2022. The refreshed policy identifies the services within the council working
together to progress the development of an allotments site at Pinefield in
Elgin. The CSU will provide support for the development. (Action STRATEGIC
ERC 1.1, PI ERC002) 
4.7 The 1% target for 2021/22 has not been achieved. The Participatory
Budgeting (PB) Steering Group are continuing work with SMT/CMT to identify
budgets for PB. Work continues to raise awareness across the council in
order to make progress towards the 1% PB requirement set by Scottish Govt.
The CSU continue to explore mainstream options generated through the input
at Leadership Forum to look at budget options for PB. Cullen and Findochty
Play area PB exercises are ongoing with consultations now complete, the
CSU are working with colleagues in Lands and Parks on drawing up tender
documents. (Action STRATEGIC 1.2, PI FS214) 
4.8 The long-term plan to tackle the affordability and standard of our schools has
progressed well but fallen short of meeting the target completion date. The
action is nearing completion with the governance process approval sought at
the May 2022 programme board. Moving into 2022/23 the overall aim of this
action will be carried forward. A new set of sub-actions have been agreed and
will be put in place to effectively monitor progress. The percentage of schools
rated B or better for condition has improved from 45.3% to 56.6% during
2021/22, this has resulted in 1,614 less pupils being educated in school
buildings rated as ‘Poor’. Whilst improving the percentage did not achieve the
target set at 60.9%. Improvement in condition is a long-term aim and the
target has been set to allow progressive annual improvement. Latest national
data shows that 90% of Scottish schools are rated B or better for condition.
(STRAT3.1, PI EdS100) 
Page 91

Page 92

Service Level Outcomes - successes
4.9 Five of the six service level actions in the plan have completed. The
completion of these actions have previously been reported to this committee.
(Actions SERVICE ERC 1.2, 1.3, 1.4, 2.1 & 3.1, PI’s CLS05a, CLS05c,
SCC5c) 
Service Level Outcomes – challenges and actions to support
4.10 Originally due to complete by March 2021, the review of school business
admin was subsequently extended to end March 2022 due to the impact of
COVID-19. The project continues to be impacted by operational challenges
and has not completed by the amended date. The Senior Reviewing Officer
and Service Manager are aware and are looking to put measures in place to
support. Although subject to ongoing monitoring, revised timelines have been
agreed by the Project Management Group and will be reported to the
Transform Learning Board, however it is anticipated that the delivery date for
all phases of the plan will need to extend to 31 March 2023. (Action SERVICE
ERC 1.1) 
Recovery and Renewal Actions
4.11 Development of community resilience plans did not complete by 31 December
2021 as anticipated. This action will be refreshed and carried forward in the
revised 2022/25 service plan (para 4.2 refers). Work to create a framework for
Community Resilience Plans continues with the development of a Resilience
Plan template and a guidance document is being progressed. Work is ongoing
to refresh the Council Volunteer Policy with an intention to include Resilience
type volunteering within that refreshed document. (Action COVID ERC 1.1) 
5. SERVICE PERFORMANCE 
5.1 In line with the Performance Management Framework, operational
performance is reviewed quarterly by departmental management.  Areas
performing well and/or areas subject to a decreasing trend or where
benchmarking results show performance significantly below comparators will
be reported to this committee for member scrutiny. 
5.2 Initial publication of 2020-21 Local Government Benchmarking Framework
(LGBF) Indicators in February 2022 will be refreshed in early June.  The full
suite can be viewed within the Background Papers section of this report. 
Published indicators for this service have been incorporated within the
relevant section of this report depending on whether results are used to
evidence progress against strategic, service plan or service performance
priorities. LGBF indicators for Education, Resources and Communities are
identifiable with the CLS prefix. 
5.3 The narrative included is by exception, links to Service Performance
Indicators can be accessed within the Background Papers section of this
report. 
Page 92

Page 93

Figure 2   
Operational Indicators - successes
5.4 The percentage of schools that are rated B or better for suitability remains at
the same level as 2020/21 (98.1%) exceeding the target of 95%, above the
national average of 87%. (PI EdS101) 
5.5 The number attending holiday and term-time sports coaching sessions at
6,059 is significantly above target and is the highest annual amount ever
recorded. The securing of additional funding for the summer programme
enabled enhanced provision. (PI EdS006.2). 
5.6 Whilst the cost per attendance of sports facilities appear to have significantly
increased between 2019/20 and 2020/21, previous results were skewed by
the COVID-19 pandemic. As the numbers attending sports facilities remain
significantly lower than pre- pandemic, costs are expected to be higher. As
attendances increase it is expected that costs per attendance will be
significantly lower in 2021/22. In 2020/21 Moray ranks as being the 5th lowest
cost local authority in Scotland and 2nd lowest within the comparator authority
group, at £18.71 Moray is well below the median comparator group target
(£50.35). (PI CLS01) 
5.7 To compensate for the downturn in attendance due to the impact of COVID-19
attendance targets were adjusted. There were 95,552 attendances at health
and fitness leisure services in 2021/22 exceeding the target set at 82,500.
This shows a near return to the levels witnessed prior to the pandemic in
2019/20 (118,091). (PI EdS407.2) 
5.8 There was a downturn in library visits in 2020/21 due to the restrictions in
place. The cost per library visit increased as a result. Latest LGBF data shows
that Moray ranks as 10/32 for Scotland’s local authorities and 3/8 in the
comparator authority group, where 1 has the lowest costs and at £2.94 is
below the comparator authorities median target (£4.29). (PI CLS02) 
Operational Indicators – challenges and actions to support
5.9 Although targets were adjusted for attendance at swimming pools and leisure
services at community centres operated by Moray council neither achieved
the annual targets. Consistent increases were witnessed in both as 2021/22
progressed, with quarters 3 & 4 accounting for 58% of annual attendances at
Page 93

Page 94

swimming pools and 64% at community centres. Provided no further
restrictions are imposed, it is anticipated that 2022/23 will see attendances
return to pre-pandemic levels. (PI’s EdS407.1 & EdS407.5) 
5.10 The number of library borrowers as a percentage of the population were
below target during 2021/22 due the restrictions in place, but almost double
the percentage in 2020/21. Historically the number of library borrowers have
reduced year on year from 25% in 2010/11 to 16.9% in 2019/20 (pre-
pandemic). (PI EdS11.2) 
6. OTHER PERFORMANCE RELATED DATA 
Complaints & MP/MSP Enquiries
6.1 In line with the Performance Management Framework, complaints are
reviewed quarterly by departmental management in terms of time taken to
respond, outcome and learning points. Detailed tables can be accessed within
the Background Papers section of this report. 
6.2 A total of seven complaints were received during the second half of 2021/22
with nine complaints closed. Of those, two were at frontline stage (22%), one
being upheld and the other not upheld. Both frontline complaints were closed
within the 5-day target timescale. 
6.3 Seven investigative complaints were closed in the same period, one complaint
was upheld, three were partially upheld and the remaining three were not
upheld. The learning outcome from the upheld complaint has led to a review
of process to reflect current best practice. The three partially upheld
complaints require corrective actions with regards staff processes and training
to avoid similar future occurrences. Four of the seven closed complaints were
resolved within the target 20-day timescale. 
6.4 Of the nine complaints resolved four were regarding ASN services, of those
four one was upheld, two were partially upheld and the remaining complaint
was not upheld. 
6.5 Five MP/MSP enquiries were received during the second half of 2021/22 and
six were closed within the period. All enquiries were resolved. 
Other Performance (not included within Service Plan)
6.6 No information to report. 
Case Studies
6.7 No information to report. 
Consultation and Engagement 
6.8 No information to report.  
Page 94

Page 95

7. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Performance measurement is used to ensure the efficient and
sustainable delivery of services to meet the Council’s priorities in both
the Corporate Plan and the LOIP. 
(b) Policy and Legal
The Council has a statutory requirement to publish a range of
information that will demonstrate that it is securing best value and assist
in comparing performance both over time and between authorities where
appropriate. 
(c) Financial implications
None. 
(d) Risk Implications
None. 
(e) Staffing Implications
None. 
(f) Property
None. 
(g) Equalities/Socio Economic Impact
An Equality Impact Assessment is not required as this report is to inform
the Committee on performance. 
(h) Consultations
The Head of Education Resources & Communities, Deputy Chief
Executive (Education, Communities & Organisational 
Development), Service Managers, Legal Services, the Equal
Opportunities Officer, and Tracey Sutherland, Committee Services
Officer have been consulted with any comments received incorporated
into this report. 
8. CONCLUSION 
8.1 By 31 March 2022, the Service Plan actions are 83% complete with most
actions progressing well.  The five actions subject to slippage is a
consequence of the COVID pandemic. Outstanding actions will be
refreshed, carried forward and reported on in the revised 2022-25
service plan. 
Page 95

Page 96

Author of Report: Iain Sneddon, Research & Information Officer
Background Papers: Service Plan Actions 
Performance Indicators
Service Performance Indicators 
LGBF Indicators
Service Complaints 
Ref: SPMAN-9425411-14
Page 96

Page 97

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 8 JUNE 2022 
SUBJECT: WHOLE FAMILY WELLBEING FUND 
BY:   CHIEF OFFICER, HEALTH AND SOCIAL CARE MORAY 
1. REASON FOR REPORT 
1.1 This report is submitted to the Committee to homologate the decision made by
the previous Chair and Council Leader on the spend of the money made
available to families in Moray. 
1.2 The report is submitted to Committee in terms of Section III (D) (1) of the
Council’s Scheme of Administration relating to all the functions of the Council
as an Education Authority. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee: 
i) agree to homologate the decision made by the previous Chair and
Council Leader with regards to the spend on the Whole Family
Wellbeing Fund, within social work as Section 12 (Social Work
(Scotland) Act 1968 and Section 22 payments (Children (Scotland)
Act 1995) for families in financial and immediate need; and 
ii) note that a paper will be prepared for the Scottish Government on
how the money has been distributed. 
3. BACKGROUND 
3.1 The Scottish Government have pledged to give £500 million for Whole Family
Wellbeing Fund over the course of the next 3 years, and a particular part of
the fund, totalling £37,000 is available for Moray immediately.  This part of the
fund has been given to social work departments, and is based on population
and the Scottish Index of Multiple Deprivation (Appendix 1). 
3.2 The £37,000 was awarded to address immediate and financial need for
families in Moray, with a view to it being used to support fuel, food and
clothing/ household poverty. As this funding is to be delivered through Section
Item 15.
Page 97

Page 98

12 and 22 payments, the responsibility sits with social work who have
authority to distribute this fund. 
3.3 On the basis that there would be no immediate committee meeting at which to
ratify spend of this fund due to the local government elections, and to avoid
any delay in supporting families in immediate need, the Interim Head of
Children and Families and Justice Social Work requested agreement to enact
the spend from the outgoing Committee Chair and Council Leader.   
3.4 Social workers identified families who they understood to be experiencing
particular financial hardship, particularly with a focus on fuel poverty. Work
continues to ensure the Council have equity as work progresses to the point
of releasing payments to individual families.   
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP)) 
The issue of poverty and financial hardship is one of the high level priorities
within Moray’s Children’s Services Plan 20-23. 
This recommendation is sighted on and committed to upholding the principles
of keeping The Promise and the UNCRC Incorporation Bill. There are no
contraventions of child’s rights to consider as part of this report. 
(b) Policy and Legal
There are no policy or legal implications. We are acting within a national
framework. 
(c) Financial Implications
Funding is being provided centrally and we will only distribute within the
parameters of the allocation. 
(d) Risk Implications
There are no specific risk implications associated with this report. 
(e) Staffing Implications
There are no staffing implications associated with this report. 
(f) Property
There are no property implications associated with this report. 
(g) Equalities/Socio-Economic Impact
The funding supports the ongoing work to tackle inequalities with a focus on
poverty and hardship.   
(h) Climate Change and Biodiversity Impact
There are no climate change or Biodiversity implications associated with this
paper. 
Page 98

Page 99

(i) Consultations
Chief Officer Health and Social Care, Equal Opportunities Officer, Senior
Human Resources Advisor, Principal Accountant, Head of Governance,
Strategy and Performance and Tracey Sutherland, Committee Services
Officer. 
5. CONCLUSION 
5.1 The purpose of this report is to request that the Committee homologate
the decision made to spend of the Whole Family Wellbeing Fund tranche
that is intended to be distributed by the social work department.   
5.2 A paper shall be prepared to report to the Scottish Government on how
the money has been distributed. 
Author of Report: Tracy Stephen, Interim Head of Children, Families and Justice
Social Work 
Ref: SPMAN-305227695-12 
SPMAN-305227695-13
Page 99

Page 100

Page 100

Page 101

9Children and Families Directorate
Strategy, GIRFEC and The Promise Division 
Jane Moffat
E: jane.moffat@gov.scot 
 
Chief Social Work Officers
Directors of Finance 
9 February 2022 
Dear Colleague 
WHOLE FAMILY WELLBEING FUNDING – 2021-22 
I am writing to inform you of the details of a 2021-22 allocation of Whole Family Wellbeing Funding
to your local authority. Details of the allocations are set out in the Annex. 
As you may know, the Scottish Government’s Programme for Government committed to investing
£500 million in Whole Family Wellbeing Funding, over the lifetime of the Parliament, to help
ensure that it will #KeepThePromise to improve person-centred holistic support for children and
their families, with £50 million in 2022-23.  We are currently engaging with partners on proposals
for the design of the Whole Family Wellbeing Funding and, in particular, the framework for spend
of £50m in 2022-23.  In the meantime, as a visible signal of the our commitment and as a pre-
cursor to the Whole Family Wellbeing Funding starting properly later this year, we are providing £3
million to local authorities and £275,000 to a small number of third sector organisations to provide
cash support to families in financial and immediate need. 
The purpose of the funding is to support low income families, including those with children who are
looked after, or on the edge of care, and need help to pay for food, fuel and clothing and practical
items needed in the home etc.  It is the intention of the Scottish Government that funding is made
available for Direct Aid (sections 12 and 22) budgets within social work departments in local
authorities to support services for children, young people and their families.  This will enable social
workers to provide direct cash support based on assessments of the needs and strengths of
individual families, and help prevent crisis interventions.   
The funding has been allocated on the basis of the Scottish Welfare Fund distribution which uses
the income deprivation element of Scottish Index of Multiple Deprivation (SIMD).  To enable
flexibility, and carry over to 2022-23, the funding will be paid through a redetermination of the
General Revenue Grant and paid in the last two weeks of March 2022. 
Finally, local authorities will wish to have an awareness of how the aforementioned third sector
organisations (Aberlour, Quarriers, Includem and Children Ist) in their area are spending their
funding to avoid duplication, and maximise scale and spread of support. 
Item 15.
Page 101

Page 102

I hope this is helpful, and if you have any questions, please contact mary.sloan@gov.scot. 
Yours sincerely 
Jane Moffat
Deputy Director for Strategy, GIRFEC and The Promise 
Page 102

Page 103

Annex 
Local Authority Allocation  
£m
Aberdeen City 0.090
Aberdeenshire 0.076
Angus 0.054
Argyll & Bute 0.039
Clackmannanshire 0.033
Dumfries & Galloway 0.078
Dundee City 0.112
East Ayrshire 0.085
East Dunbartonshire 0.035
East Lothian 0.049
East Renfrewshire 0.029
Edinburgh, City of 0.204
Eilean Siar 0.012
Falkirk 0.083
Fife 0.203
Glasgow City 0.549
Highland 0.105
Inverclyde 0.064
Midlothian 0.045
Moray 0.037
North Ayrshire 0.106
North Lanarkshire 0.233
Orkney 0.007
Perth & Kinross 0.055
Renfrewshire 0.106
Scottish Borders 0.050
Shetland 0.006
South Ayrshire 0.063
South Lanarkshire 0.187
Stirling 0.037
West Dunbartonshire 0.072
West Lothian 0.096 
Page 103

Page 104

Page 104

Page 105

REPORT TO:   EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 8 JUNE 2022 
SUBJECT: CHILDREN AND FAMILIES SOCIAL WORK SERVICES
REVENUE BUDGET MONITORING TO 31 MARCH 2022 
BY:  CHIEF OFFICER, HEALTH AND SOCIAL CARE MORAY 
1. REASON FOR REPORT 
1.1 To inform the Committee of the budget position for Children and Families
Social Work Services as at 31 March 2022. 
1.2 This report is submitted to Council in terms of Section III (A) (2) of the
Council’s Scheme of Administration relating to the consideration of capital and
revenue budgets and long term financial plans. 
2.  RECOMMENDATION 
2.1 It is recommended that Committee scrutinises and notes the budget
position at 31 March 2022 
3. BACKGROUND 
3.1 The report highlights those areas of the budget where there is a significant
percentage variance identified at 31 March 2022. 
4. BUDGET POSITION 
4.1 The spend at 31 March 2022 is £17,321,000 against a budget of £19,685,000,
giving an underspend of £2,364,000 as shown in Appendix 1. 
4.2 Corporate Parenting and Commissioning has an underspend of £2,247,000.
This is mainly due to an underspend in out of area and additional resource
packages of £1,180,000, a saving of £800,000 has been approved for
2022/23. A contract for residential care in Moray has ended giving an
underspend of £573,000, a report recommending the re-investment of this
underspend was approved at Eduction, Children’s and Leisure Services
Committee on 26 January 2022 (para 10 of the minute refers). Due to children
transitioning to adult services there is an underspend on the children with
disabilities contract of £322,000. There are additional underspends on
adoption allowances and legal fees £58,000 and throughcare/aftercare grants
Item 16.
Page 105

Page 106

£56,000. There is also one-off income for an adoption placement in Moray of
£32,000. 
4.3 Staff savings from vacancies and appointment below top of scale have
exceeded the budget by £114,000. 
4.4 Covid expenditure relating to cover for staff who are self-isolating or have long
covid is £89,000. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement 
Plan (LOIP)
The Children’s Services Revenue Budget has particular reference to
National Outcome 8 – we have improved the life chances for children,
young people and families at risk. 
(b)  Policy and Legal
The Council has statutory responsibilities to meet educational
needs, the needs of children and young people in need and those it
looks after. 
(c)  Financial implications
The resource implications are set out in this report and at Appendix 1.
The underspend as at 31 March 2022 is £2,364,000 against a budget
to of £19,685,000. 
(d)  Risk implications
Budget Managers are aware of their responsibilities for managing
budget allocations and approval for any variances will be sought from
Committee in line with the Financial Regulations. 
(e)  Staffing implications
There are no staffing implications associated with this report. 
(f)  Property
There are no property implications associated with this report. 
(g)  Equalities/Socio Economic Impact
An Equality Impact Assessment is not needed because the report is to
inform the Committee on budget monitoring. 
(h)  Climate Change and Biodiversity Impacts
No climate change and biodiversity impacts arise directly from this report. 
(i) Consultations
Paul Connor, Principal Accountant and Tracey Sutherland, Committee
Services Officer, have been consulted and are in agreement with the
contents of this report where it relates to their areas of responsibility. 
Page 106

Page 107

6. CONCLUSION 
6.1 That Committee scrutinises and notes the budget position as at 31
March 2022. 
Author of Report: Tracy Stephen, Acting Head of Children’s Services 
Nicky Gosling, Accountant
Background Papers: With authors 
Ref:  SPMAN-305227695-14 / SPMAN-305227695-15 
Page 107

Page 108

Page 108

Page 109

Children and Families Social Work Services Appendix 1
Budget Monitoring Report to 31st March 2022
Service
Revised
Budget 
Budget
to Date 
Actual to
Date 
Variance to
Date  Variance
£'000  £'000  £'000  £'000 %
Children Services and Criminal Justice Management 55            55            109             (54) (98)%
Quality Assurance Team 206 206 187 19 9 %
Locality Planning Pilot 74 74 74 - -
Children's Services Area Teams 4,038 4,038 4,079 (41) (1)%
Corporate Parenting & Commissioning 13,876 13,876 11,629 2,247 16 %
Justice Services 476 476 449 27 6 %
Reviewing Team 315 315 313 2 1 %
Children Services Additional Funding 531 531 392 139 -
Efficiency Savings-Children's Services 114 114 - 114 -
Children's Services COVID 19 costs - - 89 (89) -
-
Children's Services Total 19,685 19,685 17,321 2,364 -
Item 16.
Page 109

Page 110

Page 110

Page 111

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 8 JUNE 2022 
SUBJECT: PERFORMANCE REPORT (CHILDREN AND FAMILIES AND
CRIMINAL JUSTICE SOCIAL WORK) – PERIOD TO MARCH 2022 
BY:  CHIEF OFFICER, HEALTH AND SOCIAL CARE 
1. REASON FOR REPORT 
1.1 To inform the Committee of the performance of the service for the period to 31
March 2022. 
1.2 This report is submitted to the Committee in terms of section III (D) (2) of the
Council’s Scheme of Administration in relation to the functions of the Council
as a Social Work Authority. 
2. RECOMMENDATION 
2.1 It is recommended that Committee: 
i) scrutinises and notes performance in the areas of Service
Planning, Service Performance and other related data to the end
of March 2022; and 
ii) notes the actions being taken to improve performance where 
required. 
3. BACKGROUND 
3.1 On 7 August 2019, the Council, approved a revised Performance
Management Framework for services (para 5 of the minute refers).   
4. SERVICE PLANNING 
4.1 Each service plan sets out the planned strategic and service level priorities
and outcomes it intends to deliver in the coming year aligning closely with
financial planning, corporate and community planning partnership strategic
priorities. This report provides an interim update on progress on the service
plan, key outcomes and performance indicators.   Committee is invited to
review progress to secure assurance that is satisfactory and to provide
scrutiny and further direction where performance requires attention. 
Item 17.
Page 111

Page 112

4.2 The narrative included is by exception, links to Service Plan Actions and
Performance Indicators can be accessed within the Background Papers
section of this report. 
Figure 1 
Strategic Outcomes – successes 
4.3 As at 31 March 2022 there were 178 Looked after Children (LAC) in Moray at
a rate of 9.8 per 1,000, continuing to remain below that of the comparator
authority median of 11. The proportion of LAC accommodated in Moray
Council Foster Care placements is achieving target and the proportion of LAC
in residential placements outwith Moray has remained below the target
throughout the course of 2021/22. In addition, the number of fostering
households have increased by two during 2021/22. Work to promote and
market fostering services to recruit carers has accelerated during the past
year, with a greater web and social media presence being used as key
platforms of recruitment. (Action STRAT1.1, PI’s CSCF100, LAC003,
Eds606.03, CSCF104). 
4.4 Disrupted by the COVID pandemic the Permanence and Care Excellence
(PACE) working group was re-established during quarter 4 and is working to
addressing the barriers to effective permanence planning. With the courts
service remaining as mainly a remote service new ways of working have been
adopted to ensure permanence orders can be progressed efficiently. The
LGBF performance indicator measuring the proportion of LAC with more than
one placement in the last year has reduced significantly. Moray has improved
from 29/32 to 6/32 within Scottish local authorities and from 7/8 to 1/8 in the
comparator authority group, where 1 has the lowest rate. (Action STRAT1.2,
PI CHN23) 
Strategic Outcomes – challenges and actions to support
4.5 Two LGBF indicators measuring the cost of provision for both community and
residential placements per week reduced in 2020/21, neither however have
achieved target. There has been significant improvement in ranking for
residential costs from 29/32 in 2019/20 to 21/32 in 2020/21. In many cases
residential placements are specialist for which Moray has no provision, for
these placements children are accommodated in other local authority areas
incurring higher direct and associated costs. Community placement cost
rankings have remained fairly static and Moray remains in the bottom quartile
RAG
Improved outcomes for looked after and
care experienced children and young
people
67%
Children and Young people are safe
from harm, abuse and neglect 33%
SERVICE
LEVEL
Instigate transformational change
programme 83%
56%
Data not available - Data not yet published or unavailable due
to reporting timescales.
Progress is measured over the 3-year plan period. Annual
progress is measured by milestone achievements. At the end of
Q4 the plan is slightly behind target.
Comment
SERVICE PLAN PRIORITIES
STRATEGIC
LEVEL
OVERALL PLAN PROGRESS
8
5
8
10
0
SERVICE PLAN PI'S
Achieving Target
Within Target
Below Target
Data Only
Data not
available
31
Page 112

Page 113

of Scottish local authorities. Figures 2 & 3 show that gross annual costs have
reduced in recent years, this in part is due to improvements in the proportion
of children accommodated in community-based placements and an overall
reduction in the number of children looked after. (Action STRAT1.1, PI’s
CHN8a, CHN8b, CHN9, EdS606.1, EdS606.9, CSCF102). 
Figure 2 
Figure 3 
4.6 Neglect concerns feature highly for children currently on the Child Protection
Register (CPR). Whilst the proportion has reduced during the second half of
2021/22 neglect concerns are recorded in more than a third of all children on
the CPR and the target of 24.8% has not been achieved since quarter 1. The
implementation plan for the National Society for the Prevention of Cruelty to
Children (NSPCC) Graded Care Profile is in progress and will outline 20 staff
being trained as trainers for the model, with the training being rolled out during
2022/23. Plans are in place to hold workshops during the coming year which
will highlight the issue of the neglect and its link with child protection. Child
protection training was delivered during the second half of 2021/22, feedback
from the staff was positive, after a period of consolidation for participants’
evaluation of learning outcomes will be carried out. (Action STRAT2.1, PI
CMS021c1). 
4.7 Domestic abuse concerns for children registered on the CPR have risen
steeply and consistently over the course of 2021/22. At the end of quarter 4
£4,661
£7,514
£0
£2,000
£4,000
£6,000
£8,000
£10,000
£12,000
£0
£1,000
£2,000
£3,000
£4,000
£5,000
£6,000
CHN8a - Residential Costs
CHN8a Residential Costs per child per week
CHN8a Gross Annual Residential Costs (£000's)
£399
£2,964
£0
£1,000
£2,000
£3,000
£4,000
£5,000
£0
£100
£200
£300
£400
£500
CHN8b - Community Costs
CHN8b Community Costs per child per week
CHN8b Gross Annual Community Costs (£000's)
Page 113

Page 114

2020/21 27% of children registered had this concern registered, at the end of
quarter 4 2021/22 it has risen to almost 68%. The rise in incidences of
domestic abuse during COVID-19 lockdown periods is likely to be a
contributory driver in the increases witnessed in child protection cases. As
part of the process to become accredited “Safe and Together” trainers, social
work practitioners are preparing to deliver the first training sessions to the
senior social workers in the team. This will be an important shift in culture,
skills and knowledge around the impact of domestic violence. (Action STRAT
2.3, PI CMS021f1). 
4.8 The action to minimise the impact of parental substance use has made mixed
progress. The proportion of children on the CPR as a result of parental alcohol
misuse has consistently reduced throughout the course of the past year, those
registered due to parental drug misuse however has fluctuated but ended the
year 13% higher than recorded at the start of the year. Both indicators used to
monitor progress regarding alcohol and drug misuse concerns did not achieve
target at the end of 2021/22. Partnership working continues around parental
drug and alcohol misuse including a bespoke Quality Improvement (QI)
project that is being supported by the Scottish Government QI team. This
multi-agency project will support families of children on the CPR due to
parental substance misuse. (Action STRAT2.2, PI’s CMS021g1 &
CMS021h1). 
Service Level Outcomes - successes
4.9 The reinvestment of savings to transform the children’s social work model of
practice was approved by the Education, Children’s and Leisure Services
committee on 26 January 2022 (para 10 of the minute refers). The service
model was introduced to staff during development days to gain feedback. The
service will now move forward in developing a social work innovation site and
introduce the “3 conversation” model as the new practice model. The test of
change family feedback process took place in quarter 4, the learning
experienced from the process will allow the programme to be rolled out across
the service. This Action has completed within the agreed timescale. (Action
SERV1.2) 
Service Level Outcomes – challenges and actions to support
4.10 Changes to the commissioning model have been made, but the end goal has
not yet been reached. The recruitment of a service manager to progress the
new commissioning model is in the final stages with an anticipated start date
during quarter 1 2022/23. This pivotal role will drive commissioning, quality
assurances systems, policy development and the implementation of a robust
framework to help develop a better range of services to meet the needs of
children, young people and their families. The implementation of new
commissioned services are on track to be completed during 2022/23.
Approval has been given at committee and these services are currently within
the procurement stage, prior to implementation. During quarter 4 the
appointment of an Interim Senior Commissioning Officer has allowed a
number of contracts and tenders to be reviewed and progressed through the
Additional Resource and Allocation Group (ARAG). It is anticipated that the
quality assurance and commissioning functions within Children & Families &
Criminal Justice will be significantly more robust as a result.  (Action SERV
1.3). 
Page 114

Page 115

5. SERVICE PERFORMANCE 
5.1 In line with the Performance Management Framework, operational
performance is reviewed quarterly by departmental management.  Areas
performing well and/or areas subject to a decreasing trend or where
benchmarking results show performance significantly below comparators will
be reported to this committee for member scrutiny. 
5.2 Initial publication of 2020-21 Local Government Benchmarking Framework
(LGBF) Indicators in February 2022 will be refreshed in early June. The full
suite can be viewed within the Background Papers section of this report. 
Published indicators for this service have been incorporated within the
relevant section of this report depending on whether results are used to
evidence progress against strategic, service plan or service performance
priorities. LGBF indicators for Children’s and Families & Criminal Justice
social work are identifiable with the CHN prefix. 
5.3 The narrative included is by exception, links to Service Performance
Indicators can be accessed within the Background Papers section of this
report.   
Figure 4 
Operational Indicators - successes
5.4 The proportion of initial child protection case conferences held within the
planned timescales maintained the 100% target throughout 2021/22. This
shows an improvement from the 89% meeting the timescales in 2020/21. PI
CMS001a) 
5.5 96% of agencies practitioners attended case conference meetings during
quarter 4, the highest level recorded since recording began in 2010/11. Over
the course of the year to March 2022 attendance was recorded at 92.5%,
exceeding the values of all previous years. (PI CMS004). 
5.6 The submission of criminal justice reports to courts continues to maintain the
100% target. (PI CJ01). 
Page 115

Page 116

Operational Indicators - challenges and actions to support
5.7 As Figure 5 below shows, both the number of Looked After Children (LAC)
and the number of children on the Child Protection register (CPR) have risen
in the past year, the long-term trends however are reducing. After four years
of decline 2021/22 has seen a significant rise in numbers of Children on the
CPR. Rates per 1,000 for LAC and children on the CPR are both significantly
below the median of comparator authorities. (PI’s CSCF100, CMS013) 
Figure 5 
5.8 6% of LAC were in foster care placements purchased by the Council as at 31
March 2022, whilst above target (4%) it does show a slight reduction from
2020/21. The Council continues its drive to recruit and increase the range of
foster carers employed by Moray Council which is hoped will reduce the need
for agency placements. (PI LAC007). 
5.9 Throughout 2021/22 the proportion of LAC accommodated in paid placements
has remained fairly static and above target. Although the long-term trend is on
a reducing path there remains a significant distance to meet the median of
comparator authorities’ target (65%). Whilst this shows this indicator as
underperforming, the increase in proportion of children within community-
based placements (para 4.5 refers), at a lower cost, will lead to a reduction of
the overall placement costs. (PI LAC006). 
5.10 In the second half of 2021/22, 8 of the 26 (31%) Child Protection review case
conferences were not held within the planned timescales, exceeding the 15%
target. The most common reason for these to breach timescales is an
essential practitioner being unable to attend, which in many cases is due to
illness. (PI CMS002b&d). 
5.11 Throughout the course of 2021/22 the proportion of children on the CPR for
longer than 12 months has continuously risen with the greatest rise witnessed
in quarter 4. A rise in the average number of concerns per child within quarter
4 is an indication of a rise in complexity of cases leading to a long period
spent on the CPR. (PI CMS017f) 
5.12 The percentage of offenders with community payback orders seen by their
supervising officer within 7 days of the order made has failed to make target in
227
178
95
20
37
0
10
20
30
40
50
60
70
80
90
100
0
50
100
150
200
250
Mar-17
Jun-17
Sep-17
Dec-17
Mar-18
Jun-18
Sep-18
Dec-18
Mar-19
Jun-19
Sep-19
Dec-19
Mar-20
Jun-20
Sep-20
Dec-20
Mar-21
Jun-21
Sep-21
Dec-21
Mar-22
Number of LAC and children on Child Protection register
No's of LAC No's on CP Register Linear (No's on CP Register)
Page 116

Page 117

all quarters of 2021/22, in part due to COVID-19. In comparison to 2020/21
where COVID-19 was a major detrimental factor the proportion has increased
significantly. (PI CJ02) 
6. OTHER PERFORMANCE RELATED DATA 
Complaints & MP/MSP Enquiries
6.1 In line with the Performance Management Framework, complaints are
reviewed quarterly by departmental management in terms of time taken to
respond, outcome and learning points. Detailed tables can be accessed within
the Background Papers section of this report. 
6.2 A total of 11 complaints were received during the second half of 2021/22, four
less than for the same period of 2020/21. 12 complaints were resolved and
closed during the period. Of those, three were at frontline stage (25%), one
being partially upheld and the remaining two not upheld. The average time to
resolve frontline complaints achieved target of 5 working days.  
6.3 Nine investigative complaints were closed in the same period. Of those one
was upheld (11%) and three were partially upheld (33%). The remaining five
investigative complaints were not upheld. Time taken to close Investigative
complaints varied. In quarter 3 it took an average of 21 days to close
complaints with 3 (50%) complaints closing within the 20-day time period. In
quarter 4 investigative complaints took an average of 40 days to be resolved
with none of the three complaints closing within 20 days. 
6.4 All complaints were of a differing nature with the most common category being
Process or Policy/Procedure (5 complaints), one was upheld and another
partially upheld. One complaint made against staff was not upheld 
6.5 A total of 4 MSP enquiries were received in the period between 1 October
2021 and 31 March 2022, all were resolved. 
Other Performance (not included within Service Plan)
6.6 The process of gaining family feedback in a systematic manner has been
piloted, once collated and analysed it will show a sense of where the service
areas of strength are and where improvements are needed. 
Case Studies
6.7 First offender in 2018 for a sexual offence, sentenced to a short-term custodial
sentence and released into the community on a short term sex offender
licence.  A subsequent Community Payback Order for a period 3 years was
imposed with a requirement to complete the Moving Forward: Making
Changes Programme.  This individual was supported on release from prison
to temporary housing and then onto a permanent local authority tenancy
which the person continues to manage without support.  The individual fully
complied with the Order imposed and became a positive member of the group
work programme offering support and advice to peers, whilst also showing
insight into their own offending and areas of risk.  Prior to the Order finishing
this individual secured employment and continues to have support from
immediate family, all factors which have lowered his overall risk level of
reoffending.
Page 117

Page 118

6.8 A young person aged 10, open to the department on and off for concerns
regarding parenting, poor attendance at medical appointments and low school
attendance.  The young person was made subject to a Compulsory
Supervision Order (CSO) due to school attendance. Due to continued
declining attendance a decision was made that the young person should
reside in alternative care for a period of time to allow for assessment of need
and to try and engage the family.  At the time of relocation the young person
had been out of education for almost 12 months despite the order being in
place and the family were also facing eviction.  Within the alternative care the
placement direct reparative work took place with the young person who was
able to transition back to school full-time which was a significant outcome. The
parent began to engage with a reunification assessment, had access to
independent advocacy and in working relationally with the social worker and
family support worker began to reflect and show insight into their own
difficulties and the impact on their child.  Following a period of time and
support in rebuilding the relationship the young person made a very
successful transition home to parental care whilst remaining on the
compulsory supervision order.  After a period of continued support the CSO
was terminated. The family continued to work positively with agencies and the
parent felt confident in advocating for themselves with education.  A very
positive outcome with sustained support being in place following the
reunification has been achieved.  This case is now moving towards being
closed to the social work department. 
Consultation and Engagement
6.9 Nothing to report. 
7. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Performance measurement is used to ensure the efficient and
sustainable delivery of services to meet the Council’s priorities in both
the Corporate Plan and the LOIP. 
(b) Policy and Legal
The Council has a statutory requirement to publish a range of
information that will demonstrate that it is securing best value and assist
in comparing performance both over time and between authorities where
appropriate. 
(c) Financial implications
None. 
(d) Risk Implications
None. 
(e) Staffing Implications
None. 
(f) Property
None. 
Page 118

Page 119

(g) Equalities/Socio Economic Impact
An Equality Impact Assessment is not required as this report is to inform
the Committee on performance. 
(h) Consultations
The Head of Children and Families & Criminal Justice Social Work, Chief
Officer (Health and Social Care), Deputy Chief Executive (Education,
Communities & Organisational Development), Service Managers, Legal
Services, the Equal Opportunities Officer, and Tracey Sutherland,
Committee Services Officer have been consulted with any comments
received incorporated into this report. 
8 CONCLUSION 
8.1 As at 31 March 2022, of the 12 service plan actions, one strategic level
and two service level actions have completed. Anticipated progress for
four strategic actions is behind schedule for this stage of the plan but
there is sufficient time to catch up before the end date of March 2023.
The remaining actions are either performing to or above target levels at
this stage of the plan, which is 56% complete. 
8.2 Working within the limits imposed by COVID-19 restrictions has proven
challenging in the past year, for what is predominantly a service
underpinned by working in a face-to-face manner. Staff have adapted to
the changing working environment and have continued to deliver
unbroken service provision, albeit using different methods, to the
children and young people of Moray. As the working environment
continues to transition from the impositions of the COVID-19 pandemic
the manner in which services will be delivered will also. It is not
anticipated that the service will return to pre-COVID ways of working,
but instead by embracing the new delivery methods and skills learned
will allow a more effective and blended way of service delivery. Further
challenges lie ahead to progress the integration of the service into the
Integrated Joint Board (IJB). 
Author of Report: Iain Sneddon, Research & Information Officer
Background Papers: Service Plan Actions
Performance Indicators
Performance Indicators
My Local Council
Service Complaints 
Ref: SPMAN-305227695-11