Education, Children's and Leisure Services Committee 
Tuesday, 19 September 2023 
NOTICE IS HEREBY GIVEN that a Meeting of the Education, Children's and
Leisure Services Committee is to be held at Council Chambers, Council Office,
High Street, Elgin, IV30 1BX on Tuesday, 19 September 2023 at 09:30. 
BUSINESS 
1. Sederunt 
2. Declaration of Group Decisions and Members Interests
*
3. Resolution
Consider, and if so decide, adopt the following resolution:
"That under Section 50A (4) and (5) of the Local Government
(Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Items 17 and 18 of
business on the grounds that it involves the likely disclosure of exempt
information of the class described in the relevant Paragraphs of Part 1
of Schedule 7A of the Act.”   
4. Minutes of meeting of 7 June 2023 7 - 16
5. Written Questions ** 
6. Children and Families Social Work Services Revenue
Budget Monitoring to 30 June 2023
Report by Chief Officer, Health and Social Care Moray  
17 - 22
7.* Education Revenue Budget Monitoring to 30 June 2023
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
23 - 28
Page 1

Page 2

8.* Education National Improvement Framework Report
and Plan
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
29 -
110
9.* Raising Attainment Curriculum Breadth and Digital
Infrastructure Progress
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
111 -
158
10.* Raising Attainment Improved Wellbeing Outcomes
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
159 -
174
11.* Moray Education Early Learning and Childcare -
Financial Sustainability
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
175 -
186
12.* Moray Education Speech and Language Contract and
Support
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
187 -
196
13.* Education Resources and Communities Revenue
Budget Monitoring to 30 June 2023
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
197 -
202
14.* Learning Estate Update - Future Forres Academy and
Buckie High School
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
203 -
230
15. Information Reports - if called in 
16. Question Time ***
Consider any oral question on matters delegated to the Committee in
terms of the Council's Scheme of Administration. 
Page 2

Page 3

Item(s) which the Committee may wish to consider with
the Press and Public excluded   
17.* Learning Estate Programme - Elgin High School
Extension Project Update [Para 8 and 9]
• 8 & 9. Information on proposed terms and/or expenditure to be
incurred by the Authority; 
18.* Business Support Change Management Plan for ELC
and  Primary Schools [Para 1]
• 1. Information relating to staffing matters; 
Only items marked * can be considered and determined
by all members of the Committee   
Information Reports - Not for Discussion at this Meeting
Any member wishing to call in a noting or information report from one
meeting shall give notice to Committee Services at least 48 hours
before the meeting for which the report is published. The Notice shall
be countersigned by one other elected member and shall explain the
reason for call in including any action sought. 
Information Report - Summer Holiday 2023 Funding
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
231 -
254 
Summary of Education, Children's and Leisure Services
Committee
To exercise all the functions of the Council as Education Authority
within the terms of relevant legislation with regard to school education,
nurseries and child care, Gaelic, children’s services, leisure, libraries
and museums, sport and the arts, CLD, life long learning, youth justice
and child protection.         
Page 3

Page 4

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how
the individual or members of the group will vote on any item(s) of business on
the Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any
relevant and competent business within the specified remits not already on the
agenda, to the Chair provided it is received by the Proper Officer or Committee
Services by 12 noon two working days prior to the day of the meeting.  A copy
of any written answer provided by the Chair will be tabled at the start of the
relevant section of the meeting.  The Member who has put the question may,
after the answer has been given, ask one supplementary question directly
related to the subject matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the
consent of the Chair. If a Member does not have the opportunity to put a
supplementary question because no time remains, then he or she can submit it
in writing to the Proper Officer who will arrange for a written answer to be
provided within 7 working days. 
*** Question Time - At each ordinary meeting of the Committee ten minutes will be
allowed for Members questions when any Member of the Committee can put a
question to the Chair on any business within the remit of that Section of the
Committee.  The Member who has put the question may, after the answer has
been given, ask one supplementary question directly related to the subject
matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than ten minutes
after the Committee has started on the relevant item of business, except with
the consent of the Chair.  If a Member does not have the opportunity to put a
supplementary question because no time remains, then he/she can submit it in
writing to the proper officer who will arrange for a written answer to be provided
within seven working days. 
Page 4

Page 5

MORAY COUNCIL 
Education, Children's and Leisure Services Committee 
SEDERUNT 
Councillor Kathleen Robertson  (Chair)
Councillor Bridget Mustard  (Depute Chair)  
Councillor James  Allan  (Member)
Councillor Tracy Colyer  (Member)
Councillor John Cowe  (Member)
Councillor Juli Harris  (Member)
Councillor Sandy Keith  (Member)
Councillor Scott Lawrence  (Member)
Councillor Graham Leadbitter  (Member)
Councillor Marc Macrae  (Member)
Councillor Paul McBain  (Member)
Councillor Shona Morrison  (Member)
Councillor Derek Ross  (Member)
Councillor Sonya Warren  (Member)
Councillor Ben Williams  (Member)  
Mrs Sheila Brumby  (Non-Voting Member)
Mrs Anne Currie  (Non-Voting Member)
Mr Alfie Harper  (Non-Voting Member)
Reverend Tembu Rongong  (Non-Voting Member)
Mrs Susan Slater  (Non-Voting Member)
Mrs Emma Tunnard  (Non-Voting Member)
Clerk Name: Tracey Sutherland
Clerk Telephone: 07971 879268
Clerk Email: committee.services@moray.gov.uk 
Page 5

Page 6

Page 6

Page 7

MORAY COUNCIL 
Minute of Meeting of the Education, Children's and Leisure Services
Committee 
Wednesday, 07 June 2023 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Mrs Sheila Brumby, Councillor Tracy Colyer, Councillor John Cowe, Mrs Anne
Currie, Councillor Juli Harris, Councillor Sandy Keith, Councillor Scott Lawrence,
Councillor Graham Leadbitter, Councillor Marc Macrae, Councillor Paul McBain,
Councillor Shona Morrison, Councillor Bridget Mustard, Councillor Kathleen
Robertson, Reverend Tembu Rongong, Councillor Derek Ross, Mrs Susan Slater,
Mrs Emma Tunnard, Councillor Sonya Warren, Councillor Ben Williams 
APOLOGIES 
Councillor James  Allan, Mr Alfie Harper, Ms Angela Stuart 
IN ATTENDANCE 
Also in attendance at the above meeting were the Chief Executive, Depute Chief
Executive (Education, Communities and Organisational Development), Head of
Governance, Strategy and Performance, Head of Education, Stewart McLauchlin,
Quality Improvement Manager, Susanne Campbell, Quality Improvement Officer
and Tracey Sutherland, Committee Services Officer.   
1.         Chair 
The meeting was chaired by Councillor Kathleen Robertson.  
2.         Declaration of Group Decisions and Members Interests * 
In terms of Standing Order 21 and 23 and the Councillors’ Code of Conduct, there
were no declarations from Group Leaders or Spokespersons in regard to any prior
decisions taken on how Members will vote on any item on the agenda or any
declarations of Member’s interests in respect of any item on the agenda. 
3.         Resolution 
The meeting resolved that in terms of Section 50A (4) and (5) of the Local
Government (Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Item 19 of business on the
grounds that it involves the likely disclosure of exempt information of the class
described in the relevant Paragraphs of Part 1 of Schedule 7A of the Act.  
Para Number of the
minute Para Number of Schedule 7a 
23 
6
Information relating to the financial or business affairs of
any particular person(s).     
Item 4.
Page 7

Page 8

4.         Thanks 
The Committee joined the Chair in thanking Mr Alfie Harper, Pupil Representative
and Ms Angela Stuart, Primary School Representative for their contributions during
previous ECLS Committee meetings as this would be the last meeting for both of
them and wished them every success in the future. 
In acknowledging that this was the last meeting of the Committee before the
summer break, the Committee joined the Chair in wishing all staff and pupils a
good summer break.  
5.         Order of Business 
In terms of Standing Order 29 the meeting agreed to vary the order of business set
down on the agenda and take item 12 – Learning Estate – Crossroads Primary
School Status Update as the first report after item 4 on the agenda, to allow
Councillor Coull to speak to the report. 
6.         Minute of Meeting of 19 April 2023 
The minute of the meeting of the Education, Children’s and Leisure Services
Committee dated 19 April 2023 was submitted and approved.   
7.         Written Questions ** 
The Committee noted that no written questions had been submitted. 
8.         Learning Estate - Crossroads Primary School Status Update 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) informed the Committee on the current status of
Crossroads Primary School and sought a decision by Committee on the next
steps.  
On the invitation of the Chair, Councillor Coull spoke on behalf the of the Primary
School and local community and urged members of the Committee to chose option
1 in the report.  
Councillor Warren moved that the Committee agree recommendation i), ii) a and
iii), this was seconded by Councillor Lawrence.  
Following further consideration, Councillor Colyer seconded by Councillor Mustard
proposed agreeing recommendation i), ii) b and iii)  
On the division there voted:  
For the Motion (4) Councillors Warren, Lawrence, Leadbitter and
Morrison 
For the Amendment (10) Councillors Colyer, Mustard, Cowe, Harris, Keith,
Macrae, McBain, Robertson, Ross and Williams 
Abstention (0)    
Page 8

Page 9

Accordingly the amendment became the finding of the meeting and the Committee
agreed to:  
i) note the information included in the report;    
ii) consider future options for the school soonest; and    
iii) receive a further report following issue of the next annual School Roll Forecast
report and completion of 2024/25 schools admission process.  
Councillor Cowe joined the meeting during the consideration of this item.  
9.         Education Communities and Organisational Development Service
Plans 2023-24 
A report by the Depute Chief Executive invited the Committee to consider the
Education and Education Resources and Communities Service Plans for 2023-24.  
During consideration, Councillor Mustard proposed amending the recommendation
to include 2 further recommendations that the Committee:  
i)  in agreeing the plan note that in relation to ASN in particular, the broad
principles around the actions of ASN in the service plan in recognition that
the working group will report back to the Committee with the findings which
will reflect work in this area for future years and the longer term direction of
the service; and    
ii)   agree the Business Admin review be reported back to Committee once the
consultation analyses is completed to enable the Committee to consider the
outcomes of the consultation.  
Following further consideration and as there was no one otherwise minded the
Committee agreed:  
i) to approve the Service Plans for services within Education and Education
Resources and Communities; 
ii) in agreeing the plan note that in relation to ASN in particular, the broad
principles around the actions of ASN in the service plan in recognition that
the working group will report back to the Committee with the findings which
will reflect work in this area for future years and the longer term direction of
the service; and     
iii)  agree the Business Admin review be reported back to Committee once the
consultation analyses is completed to enable the Committee to consider the
outcomes of the consultation.  
10.         Education Scotland Continuing Engagement Progress Report
Millbank Primary School 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) informed the Committee of the outcomes of the
recently published report on a Moray school following scrutiny activity by Education
Scotland.  
Page 9

Page 10

Following consideration the Committee agreed to:  
i) note the contents of this report and Education Scotland continuing
engagement findings following local authority reporting;    
ii) note that following review of evidence, Education Scotland will publish no
further reports in relation to the October 2018 inspection of Millbank Primary
School, where HM Inspectors are confident that the school has the capacity
to continue to improve; and     
iii) commend senior leaders and staff for positive improvements secured over
time for learners and the wider school community including during the
Covid-19 pandemic, resulting in a very favourable end inspection outcome
with considerable progress noted by HM Inspectors.  
11.         Education Scotland Inspection of Forres Academy 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) informed the Committee of the outcomes of the
recently published report on a Moray school following scrutiny by Education
Scotland.  
Following consideration the Committee agreed to:  
i) note the contents of this report and findings of Education Scotland following
their inspection visit; and     
ii) that following a future re-visit from Education Scotland (anticipated April
2024), a further paper will be brought to the Committee in order to provide
an update of school progress with improvements required.    
12.         Leadership and Management Arrangements for Primary Schools 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development sought Committee approval to review the current
policy and adopt this for future vacancies across Primary schools.  
Concern was raised by a number of Councillors regarding the proposed changes
and in particular the proposal to increase a paired headship to a federation model
of 3 schools for 1 Head Teacher. 
In response, the Head of Education confirmed that within 3 rural schools it allows
for collegiate working and puts a leadership model into a school that is not
currently available.  She further added that the current Head Teacher for Newmill
and Botriphne would be offered the opportunity to take on Rothiemay Primary as a
permanent appointment.  
Stewart McLauchlan, Quality Improvement Manager, further added that in a
previous authority, there had been a successful arrangement where a Head
Teacher was responsible for 5 associated schools.  
Councillor Harris sought clarification on the impact on accumulative travel time on
the time available for the Head Teacher in each school as she was concerned that
travelling between schools is not an efficient use of time.
Page 10

Page 11

In response, the Head of Education confirmed that the Head Teacher is
responsible for managing their time, including the time spent in each school.  
Councillor Warren confirmed that she was supportive of the proposals and moved
the recommendations as detailed in the report.  
Following further consideration, Councillor Ross, seconded by Councillor Keith
proposed agreeing the first recommendation only, until a full review of the policy is
undertaken.  
As a result of the further consideration, Councillor Warren withdrew her motion. 
As there was no one otherwise minded the Committee agreed that a full review of
the policy be carried out and the policy be taken back to a future meeting of the
Committee.    
13.         Devolved School Management Scheme Update 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) informed the Committee of progress with the
Devolved School Management (DSM) Scheme Review, which is part of the
Education Reform and School Empowerment agenda.  
Following consideration the Committee agreed to:  
i) reviews and notes the updated DSM scheme in the context of the revised
national guidelines following stakeholder engagement and inter authority
peer review; and 
ii) agrees the changes to the funding formulas included in the Moray DSM
Scheme. 
14.         Resumption of Meeting 
PRESENT 
Councillor Tracy Colyer, Councillor Juli Harris, Councillor, Sandy Keith, Councillor
Scott Lawrence, Councillor Graham Leadbitter, Councillor Marc Macrae, Councillor
Paul McBain, Councillor Bridget Mustard, Councillor Kathleen Robertson,
Councillor Sonya Warren, Councillor Ben Williams, Mrs Sheila Brumby, Mrs Anne
Currie and Mrs Emma Tunnard 
APOLOGIES 
Councillor James Allan, Councillor John Cowe, Councillor Shona Morrison,
Councillor Derek Ross, Mr Alfie Harper, Reverend Tembu Rongong, Mrs Susan
Slater and Ms Angela Stuart.  
ALSO IN ATTENDANCE 
Also in attendance at the above meeting were the Chief Executive, Depute Chief
Executive (Education, Communities and Organisational Development), Head of
Page 11

Page 12

Governance, Strategy and Performance, Head of Education, Stewart McLauchlan,
Quality Improvement Manager, Susanne Campbell, Quality Improvement Officer,
Lizette Van Zyl, Service Manager and Tracey Sutherland, Committee Services
Officer.   
15.         Allocation of Education Funding 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) updated the Committee on allocation of the funding
for Education in the 2023/24 revenue grant settlement and to ask the Committee to
consider the allocation of the funding taking account of these issues. 
i)   the funding is used on a permanent basis; 
ii) to amend the DSM Scheme formula for primary schools so that the Head
Teacher is non-class committed at a roll of 121 and above at a cost of
£103,000, for schools without an enhanced provision; 
iii)  to amend the DSM Scheme formula for primary schools so that Head
Teachers are class committed for 2 days at a roll of 95 – 120 at a cost of
£45,000, for schools without an enhanced provision; 
iv) to amend the DSM Scheme formula for enhanced provision primary schools
so that the Head Teacher is non-class committed at a roll of 90, this
currently has no cost provision; 
v) to provide funding for one Principal Teacher raising attainment for each
secondary school at a cost of £558,000; and 
vi) the remaining budget of £41k should be used to partially fund the extension
of the PT Flexible Education for a further year. 
16.         Cost of School Day Update and Guidance 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) informed the Committee of the publication of the
Cost of the School Day guidance to all Educational establishments following the
collaborative work that was undertaken by the Cost of the School Day Project
Workers, with schools across Moray.  
Following consideration the Committee agreed to:   
i) the progress to date to reduce the cost of the school day; and 
ii)  the Guidance that has been produced as a result of collaborative work with
Educational establishments that will be used to support ongoing work in
schools to continue to reduce the cost of the school day. 
17.         Moray Progress in Implementing the Scottish Attainment Challenge
Programme 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development informed the Committee of the impact of Scottish
Page 12

Page 13

Attainment Challenge funding for the children and young people of Moray, in
particular, those most affected by poverty.  
Following consideration the Committee agreed to:  
i) note the progress in closing the poverty related attainment gap in Moray
using Scottish Attainment Challenge funding; and 
ii)  acknowledge the impact of Covid-19 on work to close the poverty related
attainment gap and subsequent progress made, including reducing
underspend noted through targeted actions, interventions and support. 
18.         Performance Report - Education - Period to March 2023 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development informed the Committee of the performance of the
service for the period to 31 March 2023.  
Following consideration the Committee agreed to:  
i) note performance in the areas of Services Planning, Services Performance
and other related data to the end of March 2023; and    
ii) note the actions being taken to improve performance where required. 
19.         Performance Report - Education Resources and Communities -
Period to March 2023 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development informed the Committee of the performance of the
service for the period to 31 March 2023. 
Following consideration the Committee agreed to: 
i) note performance in the areas of Services Planning, Services Performance
and other related data to the end of March 2023; and    
ii) note the actions being taken to improve performance where required. 
20.         Performance Report - Children and Families and Criminal Justice 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development informed the Committee of the performance of the
service for the period to 31 March 2023. 
Following consideration the Committee agreed to: 
i) note performance in the areas of Services Planning, Services Performance
and other related data to the end of March 2023; and    
ii) note the actions being taken to improve performance where required.
Page 13

Page 14

21.         Information Reports - if called in 
The Committee noted that no Information Reports had been called in.  
22.         Question Time *** 
Under reference to paragraph 10 of the minute of the meeting of 19 April 2023,
Councillor Mustard sought an update on the Speech and Language Contract.  
In response, the Depute Chief Executive (Education, Communities and
Organisational Development) confirmed that a report will be brought to the next
meeting of the Committee in September 2023.  
Under reference to paragraph 12 of the minute of the meeting of 19 April 2023,
Councillor Keith asked the Chair if she had received a response from the Cabinet
Secretary for Education asking the Scottish Government to reassess its criteria for
positive destinations.  
The Chair confirmed that she had written to the Cabinet Secretary for Education
but had not yet received a response.  
Under reference to paragraph 21 of the minute of the meeting of 19 April 2023,
Councillor Warren sought an update on whether any further consultation had taken
place with communities in the Buckie ASG.  
In response, the Depute Chief Executive (Education, Communities and
Organisational Development) confirmed that initial discussions had taken place
with Political Group Leaders to agree a way forward and engagement on the
School Estate will be taken forward after the summer break, progressing through
ASG by ASG but no time frame has been agreed yet.  
Under reference to paragraph 21 of the minute of the meeting of 19 April 2023,
Councillor Warren raised concerns about not having seen a Service Level
Agreement for the Moray Leisure Centre.  
The Sport and Culture Service Manager confirmed that a report was submitted to
Committee in December 2019 and work started on the SLA pre Covid and
resources were then placed elsewhere.  
She further added, that following Covid, work did recommence on the SLA,
however when work on the development started, it was agreed that the SLA needs
to align to any future developments and the Council was not in a position to
formalise the SLA.  
The Monitoring Officer added that a funding agreement has been in place since
1993 and that will continue to be active until the new SLA is in place.  
Councillor Warren further added that she had requested to see the updated figures
on Fitlife memberships, including corporate memberships but did not recall seeing
the information.  
In response, the Sport and Culture Service Manager confirmed she would arrange
for the figures to be circulated.
Page 14

Page 15

Councillor Colyer, in reference to paragraph 9 of the minute of the meeting of 19
April 2023, confirmed that the report on the overspend and concerns within Self
Directed Support will be presented to the next meeting of the IJB in June and
ECLS Committee in September 2023.  
Councillor Warren raised a concern about the recycling of the old astro pitch turf
from Buckie High School and sought assurances that the Council work within its
environmental policies.  
In response, The Depute Chief Executive (Education, Communities and
Organisational Development) confirmed that the Council had the correct
arrangements in place, adhering to Council policies, however a response had been
received from the Community to change those arrangements.  She further added
that she was happy to have a further discussion with Councillor Warren about the
issue following the meeting.    
23.         Moray Leisure Centre Expansion Proposal [Para 6] 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) informed the Committee of the Moray Leisure Centre
(MLC) expansion proposals and seek direction regarding the level of support that
should be provided by the Council at this time.  
Councillor Robertson moved to defer the report for a decision at the meeting of
Moray Council on 28 June 2023 due to the financial implications contained in the
report.  This was seconded by Councillor Keith  
Councillor Lawrence sought clarification on the urgency for a decision on the report
and was a delay of a couple of months worth considering to ensure the right
decision is made.  
In response, the Depute Chief Executive (Education, Communities and
Organisational Development) confirmed that there is frailty in the building and plant
and injecting any funding to maintain either could be seen as a false
economy.  She further added that the project plan is ambitious and Moray Leisure
Centre need to obtain the relevant funding to ensure it meets the proposed
timescales for delivery.  
Councillor Lawrence added that he was not comfortable making the decision with
the current information.  Councillor Warren added that she also had concerns
about the proposals.  
Councillor Warren, seconded by Councillor Lawrence proposed deferring the
report until the meeting of Moray Council on 27 September 2023.  
On the division there voted:  
For the motion (9) Councillors Robertson, Keith, Colyer, Harris,
Leadbitter, Macrae, McBain, Mustard and Williams    
For the amendment (2) Councillors Warren and Lawrence 
Abstention (0)    
Page 15

Page 16

Accordingly the motion became the finding of the meeting and Committee agreed to
defer the report to the meeting of Moray Council on 28 June 2023. 
Page 16

Page 17

REPORT TO:   EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 19 SEPTEMBER 2023 
SUBJECT: CHILDREN AND FAMILIES SOCIAL WORK SERVICES
REVENUE BUDGET MONITORING TO 30 JUNE 2023 
BY:  CHIEF OFFICER HEALTH AND SOCIAL CARE MORAY 
1. REASON FOR REPORT 
1.1 To inform the Committee of the budget position for Children and Families
Social Work Services as at 30 June 2023. 
1.2 This report is submitted to Council in terms of Section III (A) (2) of the
Council’s Scheme of Administration relating to the consideration of capital and
revenue budgets and long term financial plans. 
2.  RECOMMENDATION 
2.1 It is recommended that Committee scrutinises and notes the budget
position at 30 June 2023. 
3. BACKGROUND 
3.1 The report highlights those areas of the budget where there is a significant
percentage variance identified at 30 June 2023 
4. BUDGET POSITION 
4.1 The spend at 30 June 2023 is £5,736,000 against a budget to date of
£6,013,000, giving an underspend of £277,000 as shown in Appendix 1. 
4.2 A contract for residential care for children with disabilities has ended due to
the transition to adult services of the young people cared for, giving a contract
underspend of £141,000. Alternative accommodation options for young
people with disabilities are being looked into. Out of area placements are
£79,000 under budget, although this can fluctuate due to the weekly cost of a
placement. Savings of £245,000 were approved at Moray Council 1 March
2023. Due to the delay in new contracts starting the saving has slipped but will
be posted later in the year. 
Item 6.
Page 17

Page 18

4.3 There are underspends on adoption allowances and legal fees £20,000,
fostering fees and allowances £21,000 and throughcare/aftercare grants
£13,000. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement 
Plan (LOIP)
The Children’s Services Revenue Budget has particular reference to
National Outcome 8 – we have improved the life chances for children,
young people and families at risk. 
(b)  Policy and Legal
The Council has statutory responsibilities to meet educational
needs, the needs of children and young people in need and those it
looks after. 
(c)  Financial implications
The resource implications are set out in this report and at Appendix 1.
The underspend as at 30 June 2023 is £277,000 against a budget to
date of £6,013,000. 
(d)  Risk implications
Budget Managers are aware of their responsibilities for managing
budget allocations and approval for any variances will be sought from
Committee in line with the Financial Regulations. 
(e)  Staffing implications
There are no staffing implications associated with this report. 
(f)  Property
There are no property implications associated with this report. 
(g)  Equalities/Socio Economic Impact
An Equality Impact Assessment is not needed because the report is to
inform the Committee on budget monitoring. 
(h)  Climate Change and Biodiversity Impacts
No climate change and biodiversity impacts arise directly from this report. 
(i) Consultations
The Chief Financial Officer and the Democratic Services Manager,
have been consulted and are in agreement with the contents of this
report where it relates to their areas of responsibility. 
6. CONCLUSION 
6.1 That Committee scrutinises and notes the budget position as at 30 June
2023. 
Page 18

Page 19

Author of Report: Tracy Stephen, Head of Service (MIJB) 
Nicky Gosling, Accountant
Background Papers: With authors 
Ref:  SPMAN-305227695-102 / SPMAN-305227695-103 
Page 19

Page 20

Page 20

Page 21

Children and Families Social Work Services Appendix 1
Budget Monitoring Report to 30 June 2023
Service
Revised
Budget 
Budget
to Date 
Actual to
Date 
Variance to
Date  Variance
£'000  £'000  £'000  £'000 %
Quality Assurance Team 229 56 50 6 11 %
Children's Services Area Teams 4,581 1,015 1,045 (30) (3)%
Corporate Parenting & Commissioning 13,092 5,076 4,776 300 6 %
Justice Services 459 80 83 (3) (4)%
Reviewing Team 343 84 83 1 1 %
Children Services Additional Funding 1,741 (298) (301) 3 -
Efficiency Savings-Children's Services (192) - - - -
-
Children's Services Total 20,253 6,013 5,736 277 -
Item 6.
Page 21

Page 22

Page 22

Page 23

REPORT TO:   EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 19 SEPTEMBER 2023 
SUBJECT: EDUCATION REVENUE BUDGET MONITORING TO 30 JUNE
2023 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the budget position for Education as at 30 June
2023. 
1.2 This report is submitted to Committee in terms of Section III (A) (2) of the
Council’s Scheme of Administration relating to the consideration of capital and
revenue budgets and long term financial plans. 
2.  RECOMMENDATION 
2.1 It is recommended that Committee considers and notes the budget
position at 30 June 2023. 
3. BACKGROUND 
3.1 The report highlights those areas of the budget where there is a significant
percentage variance identified at 30 June 2023. 
4. BUDGET POSITION 
4.1 The spend at 30 June 2023 is £26,022,000 against a budget to date of
£26,487,000, giving an underspend of £465,000 as shown in Appendix 1. 
4.2 The main underspend in Early Learning and Childcare is on the snack and
fundraising accounts, these accounts cover the academic year and any
underspends are carried forward as part of ear marked reserves.   
4.3 Devolved school budgets are underspent by £448,000 at the end of the first
quarter, £151,000 in primary schools and £297,000 in secondary schools. The
underspend is reduced by overspends on oncosts.  This is an acceptable
position due to school budgets being spent over the academic year with some
underspends due to delays in filling vacancies.  
Item 7.*
Page 23

Page 24

4.4 Education Central Services has an underspend of £6,000 on period poverty,
£7,000 on relocation costs. The underspends are reduced by an overspend of
£25,000 on central supply for long term sickness and maternity cover in
schools.  Work is planned for the start of the new academic session to review
the range of products available for period poverty and to seek the voice of our
young people in updating this. 
4.5 Additional Support for Learning has an underspend on school counselling
£7,000 and £4,000 on training. The underspend on school counselling relates
to the difference in the funding received from the Scottish Government and the
contract spend following commissioning of an external provider. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement 
Plan (LOIP)
The Education Revenue Budget has particular reference to National
Outcome 8 – we have improved the life  chances for children, young
people and families at risk. 
(b)  Policy and Legal
The Council has statutory responsibilities to meet educational
needs, the needs of children and young people in need and those it
looks after. 
(c)  Financial implications
The resource implications are set out in this report and at Appendix 1.
The underspend as at 30 June 2023 is £465,000 against a budget to
date of £26,022,000. 
(d)  Risk implications
Budget Managers are aware of their responsibilities for managing
budget allocations and approval for any variances will be sought from
Committee in line with the Financial Regulations. 
(e)  Staffing implications
There are no staffing implications associated with this report. 
(f)  Property
There are no property implications associated with this report. 
(g)  Equalities/Socio Economic Impact
An Equality Impact Assessment is not needed because the report is to
inform the Committee on budget monitoring. 
(h)  Climate Change and Biodiversity Impacts
No climate change and biodiversity impacts arise directly from this report.  
Page 24

Page 25

(i) Consultations
The Chief Financial Officer and Democratic Services Manager, have
been consulted and are in agreement with the contents of this report
where it relates to their areas of responsibility. 
6. CONCLUSION 
6.1 That Committee considers and notes the budget position as at 30 June
2023. 
Author of Report: Vivienne Cross, Head of Education 
Nicky Gosling, Accountant
Background Papers: with authors 
Ref:  SPMAN-1315769894-420 / SPMAN-1315769894-421
Page 25

Page 26

Page 26

Page 27

Educational Services Appendix 1
Budget Monitoring Report to 30 June 2023
Service
Revised
Budget 
Budget
to Date 
Actual to
Date 
Variance to
Date  Variance
£'000  £'000  £'000  £'000 %
Early Learning and Childcare 5,780 3,263 3,212 51 2 %
Primary Education 32,235 7,909 7,797 112 1 %
Secondary Education 35,953 8,487 8,192 295 3 %
Additional Support Needs 18,540 4,843 4,828 15 -
Education Central Services 4,711 1,921 1,928 (7) -
Management 132 32 30 2 6 %
Efficiency Savings-Education (386) - - - -
Education COVID 19 32 32 35 (3) (9)%
-
Educational Services Total 96,997 26,487 26,022 465 -
Item 7.*
Page 27

Page 28

Page 28

Page 29

REPORT TO: EDUCATION CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 19 SEPTEMBER 2023 
SUBJECT: EDUCATION NATIONAL IMPROVEMENT FRAMEWORK
REPORT AND PLAN 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To advise Committee of the annual National Improvement Framework plan
return which is submitted to the Scottish Government by the end of
September. 
1.2 This report is submitted to Committee in terms of Section III (D) (1) of the
Council's Scheme of Administration relating to all the functions of the Council
as an Education Authority. 
2. RECOMMENDATION 
2.1 It is recommended that Committee: 
(ï) Scrutinises and notes the contents of the Moray Self-evaluation
document progress report; and 
(ii) Agrees the annual National Improvement Plan (NIF) and Stretch Aims
return be submitted to Scottish Government by 30 September 2023. 
3. BACKGROUND 
3.1 The National Improvement Framework (NIF) for Scottish Education was
launched in January 2016.  The framework supports the Scottish Government
Ambition to achieve excellence and equity for every child in Scotland and
guides on the Raising Attainment for All (RAFA) agenda.  It places a legal
duty on local authorities to actively address the poverty related attainment
gap. 
3.2 The Framework is underpinned by a series of planning and reporting duties
designed to support transparency and accountability.  These legal duties have
been integrated into the Standards in Scotland’s Schools etc. Act 2000
through amendments contained in Part 1 of the Education (Scotland) Act
Item 8.*
Page 29

Page 30

2016.  The Scottish Government produces annual advice in December to
provide the focus for the NIF for the following year.  Prior to December 2021
there were 4 key priorities for action however the 2022 NIF has been updated
with the following 5 priorities: 
• Placing the human rights and needs of every child and young person at
the centre of education;
• Improvement in children and young people’s health and wellbeing;
• Closing the attainment gap between the most and least disadvantaged
children and young people;
• Improvement in skills and sustained, positive school-leaver
destinations for all young people; and
• Improvement in attainment, particularly in literacy and numeracy. 
3.3 The Scottish Government has published statutory guidance to support
education authorities to carry out the legal responsibilities. The statutory
guidance clarifies how the 2000 Act has been amended through 
the 2016 Act in order to: 
• impose duties on education authorities to enhance equity and promote
a reduction in inequalities of educational outcome experienced by
pupils as a result of socio-economic disadvantage;
• impose a duty to secure improvement in the quality of school education
with a view to achieving the strategic priorities of the NIF; and
• impose duties in relation to annual planning and reporting; and annual
school improvement planning. 
3.4 Local Authorities must produce a NIF work plan on an annual basis which is
then submitted to Scottish Ministers.  The purpose of the plan is to outline key
actions that the Local Authority will take to address the excellence and equity
agenda.  The Education Strategic Plan 2020-23 provided a vision for the
Education department and for associated officers within Education Resources
and Communities.  Although the key priority areas do not exactly match the
NIF priorities, there were clear links and associated actions within the service
plan, cross referenced throughout.  Officer workplans were reviewed annually
with progress monitored by the Education, Children’s Services and Leisure
Committee on a quarterly basis.  This plan has now been reviewed and
service priorities for the academic session 2023/24 established as reported to
Committee on 7 June 2023 (Para 9 of the minute refers). 
3.5 Head Teachers of schools are also expected to produce an Annual School
Improvement Plan (SIP) which takes forward developments at a local level. 
These plans are informed by the NIF, the appropriate Local Authority strategic
plans (Corporate Plan, Moray Children’s Services Plan, and Education
Strategic Plan etc).  They are submitted to the Head of Education by 30 June
each year and are subject to scrutiny by the Moray Quality Improvement
Team.  All Moray SIPs are aligned with the NIF and local priorities and
feedback is provided from the central Quality Improvement Team. 
3.6 The NIF plan is expected to be in place by the end of September this year. 
Page 30

Page 31

3.7 In Moray, Officers and Head Teachers have continued to lead positively as
the system continues to deal with the impact of national lockdowns and the
pandemic.  Literacy and Numeracy have been key drivers for improvement
with progress reported regularly to Committee.  The wellbeing of staff and
pupils continues to pose a challenge for the service along with a growing
identification of Additional Support Needs (ASN).  Changes in senior
leadership within Education in June 2023 resulted in a temporary move of the
ASN Service to the Head of Education who will lead the ASN Review moving
forwards.   
3.8 Once again in Session 2022/23, staffing issues across nurseries and schools
initiated exigencies of the service with central staff redeployed on several
occasions.  This along with staff absence, hindered progress in some areas of
improvement however the self-evaluation document attached (Appendix 1)
gives detail of a number of strategies developed and or updated during the
course of the year.   
3.9 The Moray Education NIF Progress Report Self-evaluation in Appendix 1,
gives a fair and balanced overview of the Education Service and the
improvement journey over the course of the last year and in particular
showcases through photographic evidence, the work ongoing across the
system.  Of particular note is the key successes evident and the spotlight on
individual schools of note. As the Moray Education plan 20-23 is signed off
the document contains extensive self-evaluation evidence to support progress
along with an assessment of whether the work is complete, will continue or
are retired. 
3.10 As part of the requirements of reporting within the Scottish Attainment
Challenge, an end of year report for the Care-Experienced Children and
Young People (CEC&YP) Funding is included.  Positive progress has been
made with a virtual Head Teacher appointed towards the end of the session,
providing further capacity to track, monitor and support our CEC&YP as well
as fulfilling Education’s commitment to the Promise. 
3.11 As part of the framework for recovery and accelerating progress as published
by the Scottish Government in March 2022, Stretch Aims were set for key
attainment and wellbeing measures.  The self-evaluation document provides
information on progress and the NIF Plan 2023-24 (Appendix 2) includes a
review of the aims for the coming session. Progress is being made across a
number of indicators and they will continue to be a priority in the coming year.   
3.11 In February 2023, the service were involved in a Collaborative Improvement
Visit through shared work with Education Scotland and the Association of
Directors of Education Scotland (ADES).  The aim of the visit was for Moray to
share a ‘wicked’ issue or an area currently progressing with the view to this
being scrutinised by those involved as well as support the improvement
journey.  The service identified work ongoing regarding curricular offer in the
senior phase linked with raising attainment.  The report is included in
Appendix 1 (pages 53-57). 
Page 31

Page 32

3.12 As a result of the Collaborative Improvement Visit, the scope of which was
wider than the original area identified, the service completed the review of
Education priorities across the system.  Key areas identified were: 
• Learning, Teaching and Assessment
• Curriculum
• Empowered leadership and
• ASN Review with this moving to the core Education service 
3.13 At the penultimate strategic meeting of the session, leaders across the
service, working with the central team agreed the following: 
• Learning, Teaching and Assessment – all teachers to be provided with
the book Power Up Your Pedagogy and all schools to create a
programme within collegiate time and or at in-service days to improve
learning and teaching across Moray 
3.14 The final strategic meeting of the session was used to create a new strategic
approach to school improvement with the creation of a Curriculum Strategy
Group and Moray Improvement Groups (MIGs) where system leaders will be
empowered to lead strategic work over the course of the session.  To support
empowerment and leadership, time for leading will be provided, adding
capacity in the system. 
3.15 Progress will be reported to Committee during normal processes. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
This report was informed by the priorities within the Corporate Plan and
10 Year Plan and in particular to Our People, Our Place and Our Future
and A Growing and Diverse Economy and Building a better future for our
children and young people in Moray. 
(b) Policy and Legal
The Education Act and Standards in Scotland’s Schools Act have been
adhered to. 
(c) Financial implications
The cost of all improvement actions are undertaken within schools
existing budgets and through the central Education budget.  Any
additional funding has been through Pupil Equity Fund (PEF) allocations
as well as any additional Covid-19 grants received. 
(d) Risk Implications
Covid-19 absence continues to impact on service and service delivery
which could have a negative impact on progress throughout the session. 
Vacancies in key strategic roles will also have an impact.  Lack of
progression in recruiting additional Research and Information Officer to
support Education’s plan to explore Power BI to improve data access,
Page 32

Page 33

and reporting.  Potential risk that even with the planned work, the
Council does not close the poverty related attainment gap. 
(e) Staffing Implications
Staff absence, including those in leadership roles, has an impact on the
ability to improve service offer. 
(f) Property
There are no property issues arising from this report. 
(g) Equalities/Socio Economic Impact
The National Improvement Framework is aimed at reducing inequalities. 
(h) Climate Change and Biodiversity Impacts
None 
(i) Consultations
The Head of Education Resources and Communities, the Head of
Financial Services, Head of HR, ICT and OD, Quality Improvement
Manager, the Business Support Team Manager and the Democratic
Services Manager, have been consulted on this report and agree with
the sections of the report relating to their areas of responsibility. 
5. CONCLUSION 
5.1 Committee is asked to review the evidence provided in the NIF return
documents, acknowledge the continued impact of the pandemic and
agree the submission to Scottish Government due by the end of
September 2023. 
Author of Report: Vivienne Cross, Head of Education
Background Papers: National Improvement Framework  
Ref: SPMAN 
Page 33

Page 34

Page 34

Page 35

Moray Education
NIF Progress Report | Self-evaluation
2022-2023 
Improving Outcomes…for Moray’s children and young people 
Joy of Reading – Cluny Primary School
Recognising Achievements – Forres Academy Community Engagement – Linkwood Primary School
Baxters Soup Challenge 2023 Winners: Elgin Academy
Item 8.*
Page 35

Page 36

2
Contents 
Item Page
Our Moray Context 3
Our Improvement Journey 4
Our Service and Structure 8
Our key successes 10
Communication and Collaboration 13
Our Moray Education Priorities 14
Improving Outcomes for all 15
Curriculum 52
Learning, Teaching and Assessment 58
Scottish Attainment Challenge | Cost of the School Day 61
Supporting all Learners 62
Leadership 69
Self-evaluation for self-improvement 72
Covid-19 74
NIF | Summary Actions | 2023/2024 76  
FMRC Reading Journey Winners
Findochty Primary School
Reading Culture at Findochty Primary School 
This year’s First Minister’s Reading Challenge was a double
celebration for two sisters, both pupils of Findochty Primary School. 
Judges announced that Ivy and Daisy Mattsson had won the P4 and
P7 Pupil Reading Journey Awards respectively. 
The school’s Reading Ambassador Group travelled to Glasgow in May
for the celebrations marking the culmination of the 2023 Reading
Challenge and showcased their creative efforts to promote literacy
and reading in class. They connected with new authors and other
schools, coming away with lots of new ideas to support the next
chapter of their reading journey.   
Judges were impressed by what they described as the “brilliant
reading culture…in place at Findochty”.  In June 2023, Findochty
Primary School also achieved the Gold Reading Schools Award for
building and sustaining a whole school reading culture.
Page 36

Page 37

3
Our Moray Context 
Moray Council is the eighth largest council by land area in Scotland. In June 2021, the population of Moray
was 96,410 (23rd out of 32 Scottish local authorities) and one of 24 Council areas with a population
increase within Scotland. There are 45 primary schools, where one Primary School – Inveravon Primary
School – was permanently closed in July 2023 following confirmation by Scottish Government Ministers
in accordance with the Schools (Consultation) (Scotland) Act 2010.  Crossroads Primary School is currently
mothballed. Our secondary school estate comprises of 8 schools located across Moray. Children with
additional support needs receive the support they require within mainstream schools although some may
attend an Enhanced Provision Unit for some or all of the time. In Moray, approximately 35.4% of pupils in
Primary and 47.1% in Secondary are recognised as having additional support needs, which is higher than
the national average (noted as 28.3% of Primary School pupils and 40.1% of Secondary School pupils in
Scotland in 2022 with an Additional Support Need – Scottish Government Summary Statistics for Schools
in Scotland, 2022). 
Moray continues to have areas identified as being in Scottish Index of Multiple Deprivation (SIMD) decile
1, with families now living in decile 1 following Scottish Government reclassification. Four areas in Moray
are classified within the most deprived in Scotland.  In Moray, 424 pupils fall within SIMD decile 1 which
indicates that an increasing number of children and young people are living in poverty within Moray. This
is also the case for some relatively remote communities in the area with wider poverty related factors
including rurality, transport and cost of living impacting on family disposable incomes available. Moray
population estimates suggest that two thirds of the Moray population are of working age, one fifth are
aged under 16 years and the remaining one fifth are of pensionable age. 
Outwith Universal Free School Meal stages (P1-P5), 13.3 % of P6 and 12.1% of P7 pupils access free school
meals, both notably below national averages of 20.8% and 20.2% respectively.  In secondary, 10.4% of
pupils are registered for free school meals, below National average of 17.8%.  Approximately 180 of our
pupils are classified as looked after where at September 2022 Scottish Government census date, 33 of our
pupils were also identified as holding refugee status.  108 of our pupils are new to English as an additional
language with 124 at early acquisition stage and 126 developing competence in English language.  45.0 of
our children and young people per 1,000 pupils are rate assessed and/or declared as having a disability in
Moray, above the national average of 27.7.   
Our Values
Page 37

Page 38

4
Our Improvement Journey 
Session 2022/2023 enabled us to look forwards with focus on recovery and increasing our pace of
improvement in a landscape of awareness that a number of our children and families continued to be
impacted by a cost of living crisis and post-pandemic wellbeing and transition effects.   
In the final year of our 3-year Strategic Improvement Plan, the service
continued to progress key actions for improvement whilst also
encouraging empowerment across the system within the local policy
and guidance frameworks.  As we finalise the implementation of the
Early Years’ Expansion to 1140 hours, a few capital projects remain to
be completed with work underway to support this. 
Across the Education service, virtual approaches to key areas of
delivery including recruitment processes, meetings, online learning
platforms and apps continue to be embraced.  This offers a number of
efficiencies in terms time, cost, reduced carbon footprint and
strengthened collaboration within and beyond Moray.  Supporting all
of our learners continues to be a core area of focus with launch of the
Supporting All Learners (SAL) strategy in November 2022 In-service,
founded on the basis of Nurturing, Relational and Solutions-focussed
practice. 
In order to support and encourage empowerment and a culture of
supportive challenge across leaders and schools, a revised
Secondary Attainment and Performance Framework along with
scaffolded Secondary Improvement Model was introduced
following consultation, in August 2022.  This has provided
opportunities for collaboration, reflection, and identification of
school strengths and areas of future focus for school
improvement.  The Head Teacher Consultative Group was
introduced, providing a network for consultation and sense check
for key strategies, policies, guidance and approaches.  This has
supported successful launch of Moray Education initiatives
including SAL strategy, school visit programme approaches,
Additional Support Needs (ASN) developments and wider service
changes.  This was reviewed in June 2023 to include representation
from Early Years.   
Robert Burns in Song
St Thomas RC Primary School
Fire Safety
Craigellachie Primary School
Refocused Learning and Teaching
Keith Grammar School
Page 38

Page 39

5
As part of our Education Service Self-evaluation, we
organised and participated in the Association of
Directors of Education Scotland (ADES) and Education
Scotland Collaborative Improvement visit to Moray in
February 2023 as part of a Scotland-wide visit
programme.  The focus was initially on Senior Phase
Curriculum and strengthening our partnership
approaches to benefit learner attainment and
achievement.  However, the wealth and depth of self-
evaluation gathered extended beyond the initial focus
and has informed and guided our service direction,
including streamlining of Service Improvement
Priorities as we look to session 2023/2024. 
Over the course of the year, we were able to maintain our commitment to teacher numbers with
additional Newly Qualified Teachers (NQTs) providing welcomed capacity and enthusiasm to school
teams.  A number of senior appointments were made, ensuring continuity in establishments.  However,
recruitment challenges remain for a number of Primary positions including our denominational schools
which will continue into the start of the new session.  Workforce planning and leadership development is
underway in order to mitigate this.  Due to absence across the Education Service, officers were required
to support specific establishments which resulted in reduced capacity centrally.  In spite of this a number
of key policy reviews and improvement actions have been progressed and completed. 
Following competitive interviews, we were delighted to receive
notification that three Primary Head Teachers and one Secondary Head
Teacher had been appointed as Education Scotland Associate Assessors
giving us a total of six Associate Assessors who are supporting the National
Inspection process.  Our close collaboration with the Care Inspectorate
continues to ensure that there is ongoing dialogue around Early Learning
and Childcare standards and expectations locally.  The Early Years’
Childminder Development Officer ran successful sessions in order to
recruit and support our increasing number of childminders with work
ongoing to look at the provision of wrap-around childcare available in
Moray. 
ADES-Education Scotland 
Collaborative Improvement Event
Moray’s Newly Qualified Teachers 2022 welcomed by Vivienne Cross, Head of Education
Mags Smith
Childminding Development Officer
and STAR Award Winner
The STAR – Special Thanks And Recognition Awards – give us the chance to formally
recognise the outstanding contribution that nominated colleagues make to Moray
Council.  Mags is pictured with Cllr Kathleen Robertson, Leader of the Moray
Council and Chair of Education, Children’s and Leisure Services Committee.
Page 39

Page 40

6
The Strategic Plan continued to provide a reference point for improvement and our strategic meetings
which were extended this session to the wider Education service family and a return to in-person
meetings.  Our Education Virtual Team membership was extended to include Service Managers from
Education Resources and Communities, with weekly virtual briefings continuing to provide policy support,
critical updates and opportunities for
professional learning on key aspects of school
leadership and management. These included
updates from wider Moray Council services
and partners.  Virtual briefings also provided
a further opportunity for Head Teachers to
raise any issues, compliments or concerns
with the Head of Education and senior Service
Managers.  Weekly communication briefings
continued with a review of layout and content
based on feedback from the Consultative
Group.  These practices will continue for the
session ahead as they are welcomed by the
wider system. 
The Education, Children’s and Leisure Services Committee (ECLSC) received a wide range of reports
including attainment, performance, strategy, revenue monitoring, additional resource requests and a
number of information reports.  Regular meetings are held with the Chairperson and Vice-Chairperson of
ECLSC with timely officer briefings to committee members provided in advance of committee or on
request related to key aspects of education delivery. 
Officers have continued to progress work in each
area of our Strategic Plan guided by input from our
schools and practitioners.  In particular the Raising
Attainment Strategy is under review following
reframing of our Education Strategic Plan with a
complimentary Curriculum Strategy and
improvement activities planned to improve data
literacy across our system.  Key messages will inform
our next steps as we further work towards our
Stretch Aims and strategic actions.  National reviews
have reported during the year and ongoing National
Reform will play a key role in guiding the workflow of
Moray Improvement Groups and schools through
their School Improvement Plan priorities as we look to the future.  The Education Strategic Plan reflects
the five National Improvement Framework priorities and the accompanying document outlines our
National Improvement Framework Self-evaluation and Key Priorities.  In Moray, through the National
Improvement Framework drivers our aims are: 
Sunset over Cullen Bay
Page 40

Page 41

7
All School Improvement Plans and
agreed Working Time Agreements
continue to reflect the key priorities
outlined above, with continued focus
on accelerating progress post-
pandemic and revitalisation.  We
continue to embrace all national
policies and guidance and good
practice gathered through a range of
sources.   
Stretch Aims have been set and will be
further revised following initial setting
last year as part of Scottish
Government and Education Scotland’s
approaches outlined in the
Framework for Recovery and
Accelerating Progress, revised
guidance on Pupil Equity Funding and
allocation of additional resources
through Strategic Equity Funding.   
The Early Years’ team have worked closely with Nursery Managers, PVI Managers and Health Partners in
order to ensure full information on each individual child is available and understood, supporting early
intervention for meeting learner needs.  Our central team including our Early Intervention Teachers work
across establishments in order to support settings in a range of approaches to strengthen early literacy,
speech and language and developmental pathways. 
Following an interim restructure in June 2023, Additional Support Needs has transitioned to be a part of
the Education Service, from Education Resources and Communities.  As a result, the ongoing local review
of ASN has been modified following a short-life working group including elected members.  This work will
progress at pace in session 2023/2024 with an initial focus on staged intervention, the role of the class
teacher and recording of Additional Support Needs.  Further work on the ASN funding allocation model
and moderation process will be undertaken early in the session.  Training at universal and targeted stages
will be provided to practitioners across our system for professional development, making full use of
additional staffing under transformation. 
Edward Clark
Moray Young
Musician 
2023
[Forres Academy] 
Active Schools Sports Leader Dance Sessions
Mosstodloch Primary School
Learning and Teaching
Professional Development
Keith Grammar School
Page 41

Page 42

8
Our Service and Structure 
Moray Education sits within the wider Education, Communities and Organisational Development (ECOD)
section of the Moray Council.  At the start of the session, two Heads of Service reporting directly to the
Deputy Chief Executive (ECOD) led the service.  Children’s Social Work Services continued to transition to
the Moray Integrated Joint Board (IJB) with a newly appointed Head of Service progressing this work. 
At the end of May 2023, the Head of Education Resources and Communities departed from post, resulting
in an interim structure in order to support the ongoing ASN review and wider budgetary planning across
the Moray Council.  The Head of Education (Chief Education Officer) now assumes responsibility for all
Additional Support Needs services including Moray SEBN, Education Psychology Service and ASN officers. 
This has led to internal change to governance arrangements and operational adjustments as well as an
opportunity to combine our resources in order to meet learners’ needs further. 
Pre-May
2023
Post-May
2023
Page 42

Page 43

9
Within Moray Education, a number of Service Managers and team members continue to lead aspects of
Service delivery overseen by the respective Head of Service:  Head of Education (Chief Education Officer)
and now, an interim Acting Head of Education Resources and Communities (ERC) within a reduced ERC
service model.  These include: 
Education Education Resources and Communities
 Early Years’ Service Manager
 Quality Improvement Managers
 Head Teachers 
 HT SEBN and Team
 Quality Improvement Officers
 Principal Educational Psychologist
 Primary Advisor 
 ELC Continuous Improvement Officers
 Educational Psychology Team
 Education Support Officer - ASN
 Principal Teacher – Early Years 
 Nursery Managers
 Early Years Teachers
 Early Years Officers
 Childminder Development Officer
 Learning Technologists
 Business Support Team Manager
 Business Support Team
 Sport and Culture Service Manager
 Principal Librarian
 Principal Teacher - Music Instruction
 Senior Project Manager – Learning Estate
 Community Service Manager
 Community Service Team
 Learning Estate Project Manager/Team 
As we look to the future, we will continue to embrace outcomes of key national reforms working together,
as well as the necessity to ensure Best Value for all of Moray’s learners locally as we consider notable
financial constraints as a Council while minimising impact on service level offered to our schools. 
March 2023
March 2023
March 2023
May 2023
June 2023
Page 43

Page 44

10
Our key successes 
KEY SUCCESSES OVER SESSION 2022-2023
 As part of Moray Growth Deal, progression with the Early Years’ STEM Project with a focus on
encouraging STEM uptake through family engagement, intergenerational learning and continued
involvement of local businesses
 Early Years educator Greg Bottrill led professional development session with staff practitioners,
teachers and managers
 86% of Primary Schools and 100% of Secondary Schools in Moray are registered for UNICEF Rights
Respecting Schools award with 5 Primary Schools having achieved Gold level, 13 having achieved
Silver and 13 achieving Bronze.  In Secondary, 7 schools have achieved Silver level and 1 school has
achieved Bronze
 86 schools and early years establishments are registered for Eco schools, where 10 schools have
achieved Green Flag status
 All secondary schools are involved in the MVP (Mentors in Violence Prevention) programme, with
six of eight schools involved in training to date and final two schools training completed by October
2023
 Following Supporting All Learners Strategy launch, a commitment to delivery of nurture training
using agreed approaches from our Educational Psychology team have been developed for roll-out
in 2023/2024
 Further strengthening of academic and wider partnerships including DYW Moray, Skills
Development Scotland, Moray College UHI and wider organisations - Scottish Government Insight
and Education Scotland Curriculum Innovation team - leading to positive engagement through
Curriculum Innovation
 Increased involvement in, and learning from, single and multi-agency learning reviews which has
resulted in an increased awareness and understanding of need for early intervention and
prevention strategies for safeguarding
 Migration of all Moray Primary Schools to use of Seemis Progress + Achievement for tracking and
monitoring learner progress in the Broad General Education with analysis tool under development
for launch in session 2023/2024
 All Moray Secondary Schools are part of the Scottish Credit and Qualifications Framework (SCQF)
School Ambassador programme with extension of curriculum offer for added breadth and depth
of learning underway
 65 Moray practitioners were trained through a bespoke Education Scotland Quality Assurance and
Moderation Support Officer (QAMSO) training programme, further supplemented by Moray
collaborative professional learning support
 Completion of revised Primary and Secondary School improvement visit programmes with self-
evaluation findings informing service improvement
 Launch of the Supporting All Learners Strategy during November 2022 In-service day founded on
Nurturing principles and approaches
 Launch of the revised Professional Learning and Leadership Strategy with associated toolkits in
support of practitioner development at every stage in their career
 Launch of the Parental Involvement and Engagement Strategy and resources, building on good
practice locally and nationally 
 Work with the Cost of the School Day Child Poverty Action Group, with revised Cost of the School
Day Guidance for Moray developed for our schools and wider establishments with continued focus
on removing any additional costs 
Page 44

Page 45

11
 Continued efforts to minimise digital inequity through reallocation of Scottish Government Digital
Inclusion devices including stock devices held by the local authority, removing digital exclusion
 Successful implementation of updated Inter-agency Referral Discussion (IRD) process and
guidance
 Pan-Moray multi-tiered May In-service Day with focus on collaboration and moderation (BGE to
Senior Phase) within Primary Schools, Secondary Subject Groups and Literacy/Numeracy networks
 Undertaken initial in-person moderation and review of Additional Support Needs resource
allocation involving colleagues across the service, to baseline level of need and funding required
 Supported a short-life working group of Elected Members to review approach and strategic
direction of Additional Support Needs
 Continue developing our training programme for ELC staff including child-centred approaches,
Early Talk Boost, Makaton, SCERTS and Earlybird which is being rolled out across the service to
upskill staff and better meet needs of our youngest learners
 Continued access to counselling services through Exchange and Sonas which is realising positive
benefits for children and their families 
 Continued work with Children’s Services colleagues to ensure the rights and wellbeing of all
children and young people in Moray are supported as framed by our Children’s Services Plan
 Increased registration and engagement for practitioner professional learning with the World
Education Summit online sessions and resources, in partnership with the Northern Alliance
 Collaboration and support offered through National networks including ADES and Northern
Alliance covering assessment and moderation, play based approaches, child-centred learning,
curriculum and qualifications, performance and improvement and professional learning
 Senior officer involvement in ADES-Education Scotland Collaborative Improvement visits to
Renfrewshire Council and Midlothian Council for looking outwards for supporting improvement,
networking across Scotland and gathering good practice for service improvement
 Moray ADES-Education Scotland Collaborative Improvement visit providing significant
engagement opportunity and self-evaluation evidence from across our system to inform future
priorities
 Across Moray, 23 schools are registered with the Reading Schools Award scheme where one
Primary School has also achieved the Gold award in Reading Schools
 Leadership development of practitioners across Moray which has included 7 senior leaders
achieving the Standard for Headship through Into Headship last session and this session:
o Teacher Leadership – 2
o In Headship – 1
o Excellence in Headship – 7
o Into Headship – 4
o Aspiring to Middle Leadership – 13
o Middle Leaders, Leading Change – 7
o Building Racial Literacy – 3
o 55 colleagues were promoted within Moray Education from Sept 22 to June 23
 Work in partnership with our Education Scotland Attainment Advisor through monitoring of
Scottish Attainment Challenge monies and impact, tri-annual reporting and financial monitoring
which has resulted in significant reduction of Pupil Equity Funding underspend as a result of
pandemic impact on spending.  Schools are realising positive impact through PEF and SEF
 Successful appointments to a range of Senior Leadership posts in our schools, driving school
improvement
 Ensuring our Moray Elected Members are fully informed of key service developments and updates
including service plan updates, strategy reviews, regular attainment briefings and committee
reporting to Education, Children’s and Leisure Services Committee
Page 45

Page 46

12
Responsible Citizens and Effective Contributors
Spotlight on Cullen Primary School 
Pupils and staff at Cullen Primary School have taken part in a marathon challenge to raise a
fantastic £1,800 for the Archie Foundation, the official charity of the Royal Aberdeen Children’s
Hospital. 
The youngsters choose to raise money for the charity to show their support for Primary 5 classmate
Freddie Irwin, who has been receiving treatment for leukaemia at the hospital, and to help other
children and families across the North East. 
Cullen Primary is working toward achieving the SportScotland School Sport Silver Award and has
set up a Sports Leaders Group with the help of Will Ramsay, the school’s newly qualified teacher
(NQT), to encourage pupils to share their ideas on what sport and physical activity should look in
the school, and to get involved in planning and decision making. 
They came up with the idea for a fundraising fun run and, working with Mr Ramsay, their
suggestion grew into the idea for a whole school sponsored marathon which saw every pupil and
staff member running a set distance which added up to the distance of a full marathon - 26.2 miles
or 42,200 metres. 
Head teacher Carene Hay said: “Everyone completed the challenge with the last 100m being
completed by Freddie with the teaching team running behind. It was an
overwhelming moment to see them running towards the finish line with the
whole school cheering them on.   
“I am so proud of the children and staff for their contributions in completing
our Cullen Primary School Marathon, and to families and friends for helping
us to raise a phenomenal total of £1,800 for the Archie Foundation.” 
Page 46

Page 47

13
Communication and Collaboration 
We continue to build on approaches to sharing information and extending opportunities for collaboration. 
In Moray Education, this has involved review of approaches this session building on good practice from
last year: 
 Education Microsoft Team (previously only for Head Teacher and ELC Managers, now extending
to all Education Service Managers)
 Head Teacher Virtual Briefings (protected time for sharing information or providing opportunity
for access to Education Senior Leadership Team)
 Weekly Friday written briefings and attachments (providing essential National, partnership and
local updates and information)
 Moray Parent Forum (offering an opportunity for Parent Council Chairs/representatives to gain
updates and to gather stakeholder views.  This includes direct access for questions and answers to
the Head of Education/Service Managers)
 Pupil Representative on ECLSC; Education, Children’s and Leisure Services Committee (providing a
‘young person’s’ voice to be heard on Education matters reported to ECLSC)
 Parent/carer representative on ECLSC (providing ‘parent perspective’ on Education matters
reported to ECLSC)
 Church representatives on ECLSC (providing denominational and non-denominational viewpoint
on Education matters)
 Teacher representatives (Primary and Secondary) on ECLSC (offering voice on Education matters)
 Other communications to targeted stakeholder groups e.g. letters to staff/parents
 Collaboration with other local authorities, Northern Alliance, key Education Scotland colleagues
including Attainment Advisor, NIF Officer and Senior Regional Advisor and wider ADES colleagues 
Five S2 pupils from Elgin Academy had a taste of success
in late May 2023, taking the top prize in the annual
Baxters Soup Challenge.  Kyle Grant, Katie Ross, Robbie
Campbell, Marley Tait and Olivia Stewart impressed the
judges with their Curried Chicken and Vegetable soup.
The winning recipe fulfilled the brief to create a
delicious new soup which not only tasted good but
delivered clear health benefits.  Teams from Elgin
Academy, Forres Academy, Lossiemouth High School, Milnes High School and Speyside High School also
participated in the final. 
The Baxters Soup Challenge, which is delivered in partnership with DYW Moray, has expanded this year
to involve five local high schools, offering even more young people the opportunity to learn new
enterprise skills and gain confidence. Just under 1,000 Moray S2 pupils took part in this year’s challenge.
As well as creating the recipe for their product, pupils also had to develop a costed business and marketing
plan to produce and promote their soup, showcasing just some of the roles and career opportunities
within the food manufacturing industry.  At the final the pupils had to present their plans to the judging
panel as well as participate in a tasting session.   
Graeme Morrison, European Supply Chain Director said: “We look forward to the final of the challenge
every year; it’s a brilliant celebration of the pupils’ creativity and hard work and we are always impressed
with the standard. This year was no different but Elgin Academy’s recipe really stood out.  We created the
Soup Challenge to give local pupils the opportunity to learn more about how food products are developed
and manufactured. As a major employer in Moray, we hope it inspires young people within our local
community to ‘be different, be better’ in line with our ethos and values as a business.”
Page 47

Page 48

14
Our Moray Education priorities:  2022-2023 
We continued to progress our 3-year Strategic Plan against the
backdrop of absence across the service coupled with continued
emergence and escalation of post-pandemic challenges. 
Our Moray strategic priorities focus on the key areas of: 
 Curriculum
 Learning, Teaching and Assessment
 Supporting All Learners
 Leadership 
Work across these areas has continued to support us in meeting the
National Improvement Framework Priorities.  All staff continue to be
aware of our priorities and regular updates are provided through
Council Committee reporting processes, particularly with regard to
performance reporting and service plan updates.  The infographic
illustrates the interconnected and interdependent relationship of our
critical priority areas where work on one will rely on and impact upon
any one of the others.   
In Moray we are committed to improving outcomes for all our children and young people and reviewed this over
the course of the session to set priorities for Moray Education moving forwards, guided by self-evaluation findings.
Informed by our secondary school attainment core messages from data interrogation and analysis, all secondary
schools were visited by the Head of Education and QIM (Performance) in August 2022 in order to gain insight and
have initial conversation on improvements in performance based on examination performance.  This subsequently
led to a revised Secondary Attainment and Performance Framework and Secondary Improvement Model and
School Visit programme being introduced, with report emphasis on data, observation and views in order to
triangulate schools strengths and areas of further focus. 
Page 48

Page 49

15
Improving Outcomes for All 
We continue to progress with actions for improvement related to attainment as identified in the Best Value
Assurance Report (BVAR) published in August 2020 prepared by Audit Scotland (Accounts Commission).  We further
note that this report highlighted a number of key messages across Moray Council and in specific regard to
educational attainment. 
Central to our Moray Education priorities are the National Improvement Framework priorities and key drivers for
improvement: 
Our plans are continuously developing in order to reflect changing National and Local priorities, Scottish and local
authority guidance.  Children’s rights, wellbeing and participation in learning are at the heart of everything that
we do, working towards improving outcomes for all Moray’s children and young people. 
Page 49

Page 50

16
We continue to look to the following key National and Local policies and frameworks in order to guide our work
across Moray Education as well as key National research findings, engagement activities and published report
findings as outlined above on page 9: 
National Policy and Strategy Local Policy and Strategy
UNCRC and Children’s Rights/Participation Local Outcomes Improvement Plan (LOIP)
Children and Young People (Scotland) Act Moray Council Corporate Plan (CP)
National Improvement Framework (NIF) Moray Children’s Services Plan (CSP)
Curriculum for Excellence (CfE) Corporate Parenting Strategy and Pillars
Developing the Young Workforce (DYW) Education Strategic Plan
Getting it right for every child (GIRFEC) Education Resources Plan
Scottish Attainment Challenge/Pupil Equity Funding
(SAC/PEF) ASN Strategy and Policies
Corporate Parenting and ‘The Promise’ Raising Attainment Strategy and Toolkit
Scottish Schools (Parental Involvement) Act Learning and Teaching Strategy and Resources
Standards in Scotland’s Schools Act Curriculum Strategy and toolkit
Better Relationships, Better Learning, Better
Behaviour Senior Phase Curriculum Guidance
Digital Learning and Teaching Strategy for Scotland Early Years Play Strategy
Learning for Sustainability Professional Learning Strategy
Child Poverty Strategy for Scotland Supporting all Learners Strategy
Education Scotland/HMiE Guidance and Practice Parental Involvement and Engagement Strategy
Scottish Government publications/Audit Scotland
The Morgan Review/OECD Reports/Muir Review Assessment and Moderation Strategy
Covid-19 Guidance and Policy Tracking and Monitoring in the BGE
Strategy/Guidance
CLD Regulations and Standards iMpact Moray Strategy
Wellbeing and Child Protection Guidance Progression Frameworks/pathways
Key National Reviews including:
All Learners in Scotland Matter
Independent Review of Qualifications & Assessment
Independent review of skills delivery landscape
(see pictorial capture above on page 9)  
...and ongoing work captured through revised
Education Governance and Moray Curriculum
Strategy and Moray Improvement Groups  
Page 50

Page 51

17
showcasing their journey of improvement
Spotlight on… Millbank Primary School 
The successful improvement journey undertaken by Millbank Primary School to raise pupils’ achievement and
attainment, was recognised by Education Scotland during 2023.  The Buckie school has successfully addressed
points for action following an initial inspection in October 2018 which highlighted good performance along with
areas where improvement was needed.  Over the last four years, staff have worked hard together, and with strong
support from the education authority, to drive forward an ambitious improvement plan focused on actions which
make the greatest difference for learning and learners. 
After reviewing evidence of the school’s progress, Education Scotland has confirmed it is confident that Millbank
Primary has the capacity to continue to improve and  will make no further visits in connection with the 2018
inspection.  The inspection team made return visits to the school in February 2019 and November 2021 and
acknowledged that notable achievements had been made. As a result of the pandemic, however, when the main
focus was on ensuring children were cared for and supported in both wellbeing and learning, the school needed
more time to fully implement its improvement strategies. 
The good progress achieved by Millbank Primary School has continued, leading to positive change in the quality of
learner’s experiences, leadership at all levels, learning and teaching.  Senior leaders, working with staff and a range
of partners, are now better able to plan, analyse and track interventions. The school has improved mechanisms to
identify attainment gaps, with planned interventions in place and under development in order to address these
gaps. Clear actions for improvement have been acted on with next steps identified for further improvements over
time. 
The school continues to build on the positive and nurturing relationships between staff and pupils. Millbank
Primary’s values of respect, perseverance and fairness are embedded within school culture and ethos. There are
plans to improve outdoor learning areas and to further involve parents and the wider community in learning
activities. 
Chief Education Officer at Moray Council, Vivienne Cross, said: “Over the past four years, the staff and pupils of
Millbank Primary School, along with officers from the council, have worked incredibly hard to take the school
forward and have brought about significant improvement. 
“I am delighted with the endorsement from Education Scotland that the school is moving in the right direction and
making very good progress, and that the commitment, effort and capacity for ongoing improvement has been
recognised.” 
Head teacher, Kirsty Moneagle, said: “Our improvement journey to this point has only been possible by the collective
effort of our whole school community.  I would like to thank all of the Millbank staff for their hard work and
dedication to the school, the Parent Council for their support and the parents and families of Millbank who continue
to work with us to ensure the best outcomes for our children. Every day the children of Millbank bring a smile to my
face and I am so proud and privileged to be their Head Teacher.” 
Page 51

Page 52

18 
The following pages will review our Education Strategic Plan (incorporating the National Improvement Framework Plan for Moray Education) from session
2022-2023.  The following legend provides a key to the National Improvement Framework priority and driver column references in the final two columns
of our progress report templates on subsequent pages. 
Legend:
National Improvement Priority*: National Improvement Driver*:
1 Placing the human rights and needs of every child and young person at the
centre of education A School  and ELC leadership
2 Improvement in children and young people’s health and wellbeing B Teacher and Practitioner Professionalism
3 Closing the attainment gap between the most and least disadvantaged children
and young people C Parent/carer involvement and engagement
4 Improvement in skills and sustained, positive school-leaver destinations for all
young people D Curriculum and Assessment
5 Improvement in attainment, particularly in literacy and numeracy E School and ELC Improvement  
F Performance Information
*updated following review of the 2022 National Improvement Framework and Improvement Plan
The following key is provided to indicate level of progress in achievement of Next Steps identified during the session, outlined on subsequent pages: 
 Next steps/actions complete  Next steps/actions in progress for carry
forward to future NIF Plan !
Next steps incomplete or retired due to
new actions overtaking these 
Following review of progress to date and building on feedback from Education Service Self-evaluation and restructuring, the separate Moray Education NIF
Key Priorities and Plan 2023-2024 (incorporating revised Stretch Aims reflective of revised Scottish Government/Education Scotland Framework for
Recovery and Accelerating Progress) contains our Education Service and NIF Plan moving forwards as well as outlining Stretch Aims for Moray moving
forwards based on current intelligence. 
Page 52

Page 53

19
Priority 1 Improving Outcomes for All
Action: Next Steps Identified: Progress to date: NIF
Priority:
NIF
Driver(s):
1.1 
Learning from ACM
processes disseminated
across LA SQA
Coordinator Group (and
session 2021/2022 exam
planning and contingency
scenarios)
From discussions with different groups (SQA
Coordinators, Subject Groups) further work is required to
build and enhance our approaches to data tracking,
monitoring, interrogation and literacy across our system. 
Through data intelligence, we will work with our Middle
Leaders as a system and task Secondary School Subject
Groups with key improvement actions in order to add
value to curriculum offer, uptake and attainment. 
We will extend and seek opportunities to continue and
enhance partnership working to implement key legislative
requirements. 
Further work is required following change and uncertainty
throughout last session to restart and rejuvenate
approaches to pan-authority curriculum consortia and
intra-authority collaborative working on developments
which will add value to learning experiences. 
We will continue to focus on supporting all learners due
to emerging impact of the pandemic on learners and their
wellbeing, delivering through our Supporting All Learners
Strategy. 
Meetings of various groups continued throughout the
session, including SQA Coordinators, Secondary School
Timetablers and two meetings of Secondary School
Subject Groups also took place, including successful May
multi-tier Inset Moderation events.   
Due to ongoing issues in release of staff from schools
due to absence and wider changes underway following
ADES-Education Scotland Collaborative Improvement
event, a refreshed approach to Moray Improvement
Groups has been identified for the new session. 
Key data sets continue to be produced, analysed and
interrogated including course uptake reports and wider
attainment and achievement reports.  Core partnerships
continue with Skills Development Scotland, DYW Moray
and Moray College UHI in order to progress key pieces of
work linked to schools educational delivery and
curriculum planning through reform.  Partners are a
valued and integral partner and contributor to service
self-evaluation during the session in order to guide our
improvements for next session as outlined in our Moray
Education NIF Key Priorities and Plan 2023-2024
(incorporating Stretch Aims). 
The ADES-Education Scotland Collaborative
Improvement Event has provided a renewed vision
around Curriculum cognisant of ongoing national reform,
guided by collaboration across our Moray system and
underpinned by the supporting all learners agenda.
1,2,3,4,5 A,B,C
D,E,F

Page 53

Page 54

20 
1.2
Review and update of
attainment meeting
programme in line with
SQA and National
guidance to increase
scrutiny and challenge
regarding SQA results for
raising attainment
In line with emerging approaches to performance
management in line with our Education focus on iMpact
Moray, introduce a revised Secondary Improvement and
Performance Framework with focus on: 
 1:1 Head Teacher Meetings, discussion and
dialogue (post-SQA) to highlight key messages
and align strategic improvements to school
messages
 Post-Insight revised meeting structure, building in
Stretch Aims setting to process
 Secondary Improvement Model (SiM)
introduction to support Secondary School
baselining of key performance measures aligned
to core HGIOS?4 Quality Indicators with school
visit programme linked to SiM 
 Officer Support and Challenge linked to
performance framework
 Post-Insight (February) review and analysis of
performance with Stretch Aim setting/review
 Statutory processes and review of key
improvement planning documentation/priorities
with improvement outcomes linked to year-
through support and challenge findings
Our revised Secondary Attainment and Performance
Framework (SAPF)was introduced in August 2022 with
focus on data analysis and interrogation at school and
local authority level for identification of strengths,
progress and next steps required in order to improve
outcomes for learners across our secondary schools. 
Head Teacher meetings (1:1s) supported by the QIM
(Performance) were held with all Head Teachers by the
Head of Education in August 2022 to gather initial
thoughts and gauge readiness for further change across
our system. 
Post-Insight (September) attainment reviews based on
SAPF content were held, with discussions focussed on
improvement required, guiding School Improvement
Planning.   
Secondary School Improvement Model (SiM) introduced
with 7 of 8 secondary schools visited on full visit
programme with extended reports produced.  Visit
findings informing school self-evaluation for school
improvement and focus for future reviews. 
Triangulation of evidence, strengths and areas for future
focus identified guided by visit findings, data,
observation and views of stakeholders. 
Full programme of officer visits across the session with
extended reviewing teams on SiM visit programme
aligned to performance framework. 
Post-insight reviews undertaken during September to
November and February to April, aligned with SiM visits. 
Key discussion and actions for improvement noted. 
Schools have built in to improvement planning and SiM
visits supporting and challenging school improvement. 
1,2,3,4,5 A,B,D,E,F 

Page 54

Page 55

21
1.3
Initial analysis of SQA
attainment data and
trends 2021 – SCQF5 –
performance against
Targets identified for the
session and increase in 7
@ level 5 in S4 measure
In session 2021/2022, positive increases in attainment are
noted at 6 and 7 @ SCQF level 5.  The 1 @ SCQF level 5
measure is comparable to session 2021 with marginal
decrease of note for 5 @ SCQF level 5 (1.38%).   
The largest reduction (3 @ level 5) of 3.72% of an S4
cohort size of 927 young people in 2022, represents a
notional decrease of 34 pupils not achieving at this
measure.  The trend for attainment of 6 or more
qualifications at level 5 shows a positive position across
five of the schools (increased from 4 in session 2020, 6 in
session 2021).  There is also an emergence of positive
performance for 7 qualifications at SCQF level 5,
increasing to 18.66% or 173 learners based on 2022
cohort size of 927 young people, compared with 122
learners in 2021.   
In review of wider datasets, with the exception of the 1 or
more qualifications at SCQF level 5 noted above
(performance above National average), performance
across all measures is below both Virtual Comparator and
National averages. 
 Performance for 1 or more qualifications at SCQF level
5 is below the ACM years (2020 and 2021) but 1.52%
greater than 2019 which was the last year where a
formal SQA examination diet featured as a key part of
formal summative assessment.  
 Performance for 3 or more qualifications at SCQF level
5 is below the ACM years  (2020 and 2021) but higher
than 2019 (1.08%) which was the last year where a
formal SQA examination diet featured as a key part of
formal summative assessment. 
 Performance for 5 or more qualifications at SCQF level
5 is below 2021 but marginally above the 2020 ACM
year.  In relation to 2019 which was the last year
where a formal SQA examination diet featured as a
key part of formal summative assessment,
performance is 4.12% greater. 
 Performance for 6 or more qualifications at SCQF
level 5 is above the 2020 and 2021 ACM years.  In
relation to 2019 which was the last year where a
formal SQA examination diet featured as a key part
of formal summative assessment, performance is
4.98% greater.
 Performance for 7 or more qualifications at SCQF
level 5 is highest across the 5-year data set.  Within
existing curriculum models, schools are offering
further opportunity to study a seventh National 5
qualification, with National 5 Applications of Maths
presentations supporting this positive trend. 
Stretch Aims now form our key benchmark in respect of
attainment review with progress towards Stretch Aims to
date covered further below (p47).
1,3,4,5 A,B,D,E,F

Page 55

Page 56

22 
1.4
Initial analysis of SQA
attainment data and
trends 2020 for S5 –
SCQF6 – reviewing
impact of coursing pupils
for sufficient breadth and
depth of learning
experiences
Continue to consider with secondary school leaders and
wider partners, curriculum and accreditation
opportunities to extend opportunities for all and ensure
best possible outcomes by point of school exit.   
Through iMpact Moray Strategy, work planned on
Curriculum breadth, offer and support through
planning/discussions to develop: 
 Moray Insight Strategy (with Insight Advisor)
 Curriculum Innovation (with Education Scotland)
 SCQF Partnership/School Ambassador Programme (with
SCQF)
 DYW Moray partnership offer
 College Partnership (with Moray College UHI)
_______________________________________________ 
Following return to an SQA examination diet in 2022, it is
noted that performance has marginally reduced for the S5
cohort in 2022 compared with the 2020 and 2021 ACM
presentation years overall.   
In review of wider datasets and the measures for 1 or
more and 3 or more qualifications at SCQF level 6,
performance is marginally below Virtual and National
Comparators.  At the 5 or more qualifications at SCQF
level 6 measure, performance is particularly below Virtual
and National Comparators and of particular note. 
Compared to 2019 as the last academic session where
SQA examinations were present as summative
assessment format, there is positive improvement noted
at for 1 and 3 passes at SCQF level 6.  The largest increase
(1 @ level 6) of 4.43% of a cohort size of 773 young
people, represents an additional 34 pupils achieving at
this measure.   
Working with the Scottish Government Insight Advisor,
we continued with the Insight Strategy involving
practitioners across Moray secondary schools and with
different groups, supporting data interrogation and
analysis for intervention and in order to close identified
attainment gaps at individual pupil, group and cohort
level within Moray secondary schools. 
Virtual Curriculum sessions and a Curriculum Innovation
Day was held with school leaders, central team, SDS,
DYW and Moray College UHI partners and Education
Scotland Curriculum Innovation Team to ensure the
Curriculum moving forwards is current, comprehensive,
offers extensive choice and supports young people in
developing knowledge and skills to ensure they are on a
level playing field with young people Nationally.   
Working with the SCQF Partnership, we adopted the
SCQF Ambassador programme across Moray’s eight
secondary schools to raise awareness and embrace
wider qualifications and accreditation opportunities for
extended opportunities for all young people. 
Implementation of a revised Secondary Improvement
Model (SIM) with school partnerships (pairings)
identified to support continuous improvements and
school visit programme finalised to be undertaken
during term 2 and term 3. 
Partnership work continued with key partners including
Moray College UHI, DYW Moray and SDS to strengthen
opportunities for all young people reflective of labour
market, wider context intelligence and pathways.
1,3,4,5 A,B,D,E,F

Page 56

Page 57

23
1.5
Initial analysis of SQA
attainment data and
trends for 2020 for S6 –
SCQF 6 and SCQF7
reviewing impact of
coursing pupils for
sufficient breadth and
depth of learning
experiences
This data is based upon the S6 cohort numbers who
continue to S6 as a common measure for measuring
performance with SQA qualifications. 
In review of wider datasets and the measures for 3 or
more and 5 or more qualifications at SCQF level 6,
performance is marginally below Virtual and National
Comparators.  At the 1 or more qualifications at SCQF
level 7 measure, performance is marginally below Virtual
and National Comparators. 
In comparison with the 2020 and 2021 ACM years,
performance has marginally dropped for the 3 @ SCQF
level 6 and 5 @ SCQF level 6 measure for S6.  The largest
marginal fall in performance for 5 @ SCQF level 6 of 5.5%
represents 28 learners based on S6 cohort size. In total,
204 young people achieved at least one SCQF level 7
qualification based on dataset presented. 
As noted in 1.4 above, work continues on Curriculum
opportunities, breadth and depth through work on
Curriculum Innovation, partnership working with key
colleagues and through revised approaches to service
delivery and improvement.   
Secondary Improvement Model Visits, Curriculum
Innovation Day and findings gathered on ADES-Education
Scotland Collaborative Improvement event continue to
guide our next steps for continuous improvement. 
Along with S5, Stretch Aims now form our key benchmark
in respect of attainment review with progress towards
Stretch Aims to date covered further below (p47). 
Performance for 3 or more  qualifications at SCQF level 6
is below the ACM years (2020 and 2021) and marginally
below 2019 (1.4%; 7 learners) which was the last year
where a formal SQA examination diet featured as a key
part of formal summative assessment. 
Performance for 5 or more  qualifications at SCQF level 6
is below the ACM years (2020 and 2021) and marginally
below 2019 (2.8%; 14 learners) which was the last year
where a formal SQA examination diet featured as a key
part of formal summative assessment. 
Performance for 1 or more
qualifications at SCQF level 7 is
below the ACM years (2020 and
2021) and above 2019 performance
(2.2%; 11 pupils).  It is noted that
study to SCQF level 7 may not be the
preference for most young people,
who prefer to add breadth to
qualifications portfolio they hold, at
SCQF level 6. 
1,3,4,5  A,B,D,E,F  

Page 57

Page 58

24 
1.6
Review of subject
performance, support
and challenge linked to
local authority
frameworks for
improvement and
priority areas
Subject performance has been reviewed at school and
local authority level and support and challenge
arrangements continue to be under review for ongoing
subject group meetings as we prepare for the
expectations and requirements for SQA Exam Diet 2022. 
Further consideration required to the role of Subject
Groups and strategy around Middle Leaders in
approaches to developing curriculum offer and wider
accreditation opportunities. 
Further review of the role of Subject Groups due to
variability and consistency in delivery and outcomes, with
focus on empowerment. 
Review of data interrogation systems to support further
analysis of Secondary Subject performance (subject
uptake, attainment, quality of pass, Moray data set
breadth and depth of SQA and SCQF qualifications offer). 
In Moray, over 90% of young people achieved an award
(A-D) at S4 National 5, S5 Higher and S6 Advanced Higher
levels.  In S4, performance is in line with session
2018/2019 as the last comparable SQA Examination year. 
Strong S4 performance is noted in National 5 Art and
Design, English, Music and Physical Education.  National 5
Maths also continues to show positive attainment of
young people. 
Performance at S5 for Higher highlights positive subject
performance with 92% of young people achieving an
award (A-D).  In particular, young people performed well
in Art and Design, Business Management, English,
Geography, Modern Studies and Physical Education. 
Performance and pass rates are once again noted as
comparable to pre-pandemic levels.
Virtual Curriculum sessions and a Curriculum Innovation
Day was held with school leaders, central team, partners
noted above and Education Scotland Curriculum
Innovation Team to ensure the Curriculum moving
forwards is current, comprehensive, offers extensive
choice and supports young people in developing
knowledge and skills to ensure they are on a level
playing field with young people Nationally.   
Key projects and workstreams are planned with
identified partnership working moving forwards to
strengthen curriculum offer, pathways and accreditation
for raising attainment and achievement for all young
people. 
Following discussions through Impact Moray and with
Secondary Head Teachers, work has been identified to
progress with Subject Leaders and refocus the role and
purpose of Secondary Subject Groups and review of
subject breadth and depth with Middle Leader event in
initial planning stages  Review of curricular provision
including range and number of qualifications on offer to
support all learners using consortia approaches as well
as virtual solutions in line with OECD reports and
National advice. 
Continued focus of SQA Coordinator and Curriculum
Working Groups and project workstreams to be
confirmed, ongoing to support refreshed partnership
and consortia approaches. 
Working with the Scottish Government Insight Advisor,
we continued with the Insight Strategy involving
practitioners across Moray secondary schools and with
different groups, supporting data interrogation and
analysis for intervention and in order to close identified 
1,2,3,4,5  A,B,D,E,F

Page 58

Page 59

25
In S6, young people studied a broad range of Higher and
Advanced Higher subjects, with 87% achieving awards (A-
D).  Positive Higher performance is noted in Business
Management, Modern Studies and Physical Education.  At
S6 Advanced Higher, performance was strong in a number
of subjects including Art and Design, Chemistry, English,
French, Geography, German, Mathematics, Music and
Physics.  
attainment gaps at individual pupil, group and cohort
level within Moray secondary schools. 
1.7
Review of partnership
working approaches –
Academic Partnerships –
to strengthen and extend
curriculum offer,
qualifications and
accreditation for
increased opportunities
for young people
Moray College continues to provide qualifications for
Senior Phase pupils at National 5 and Higher level as well
as Skills for Work (SfW) courses and National Progression
Awards (NPA) at levels 4 and 5.  The SfW and NPA course
provide a high proportion of passes and this supports
continued engagement with the College post-school as
well as links to apprenticeship programmes.  Current
provision is predominantly via ‘College Wednesday’. 
At National 5 and Higher level the performance is noted
below for A-C passes for 2018-2022: 
Results continue to be discussed and reviewed regularly in
partnership with Moray College link officers with next
steps identified and subsequently outlined.  This includes
extension to existing graded and ungraded pass/fail
course offers in order to extend Curriculum offer for
young people across Moray.
Low presentation numbers are noted in graded courses,
with 67 presentations certificated across courses listed
left.  Young people studied a further 224 ungraded and
non-examination based courses (SCQF rated at level 4 as
indicated below or level 5) at Moray College UHI where
based on current year, 198 passes were achieved across
a range of courses out of a possible 224 with pass rates
across these courses noted below: 
1,2,3,4,5  A,B,C
D,E,F  


Page 59

Page 60

26 
1.8
Preparation for SQA
2021/2022 SQA
examination processes
based on emerging
National advice on
contingency planning
For learners in S5 and S6, this followed one and two years
respectively of  disruption faced by them in relation to
their schooling and to the SQA examination system, with
move to Alternative Certification Models (ACMs) which
did not involve formal end of year examinations.  Learners
in S4, S5 and S6 had not yet participated in an
examination diet or related experience  (e.g. in-school
preliminary examinations or ‘prelims’) as was in place
prior to session 2019/2020. 
Modifications to assessment requirements for National 5,
Higher and Advanced Higher courses were announced by
SQA at the start of the session to support reduction in the
volume of assessment and ensure learners continue to
achieve credible qualifications, certificated in August
2022.  For most courses, these modifications remained
the same as those that were put in place for session
2020/2021.  In Moray, work continued to build on the
good practice across schools with SQA coordinators
working closely with the local authority SQA lead to
ensure pupils and staff were supported in delivery and
assessment preparation.  Learning Experiences akin to
Prelims (LEAPs) were planned and delivered in January
2022 within each secondary school, to provide pupils in
S4-S6 with an examination experience and support
collected of key evidence in the event this was required
for appeal purposes, post-August certification.   
Focus on the Moray Council Accounts Commission Best
Value Audit Report key messages and measures
continued across schools, through critical identified
actions highlighted through our Raising Attainment
Strategy.  This strategy sets out an approach to better
understand and improve educational attainment, where
focus on attainment has continued throughout the
pandemic.  Through the Improvement and Modernisation
Programme, key support was provided for a review of
Additional Support Needs (ASN) as a  further component
part of the Improvement and Modernisation
Programme - Transforming Education (Stream 7)
additional monies and investment. 
In March 2022, SQA published further additional revision
support materials to support young people in studying
for their final SQA examinations, with most Covid-19
mitigations lifted in April 2022 which allowed for SQA
exams to proceed.  Schools continued to work with
young people and staff in revising risk assessments to
ensure safety for all and implemented a range of
Additional Assessment Arrangements (AAA) where they
required these for accessing SQA examinations.  Where
appropriate and required, examples of AAA included
extra time, separate accommodation, rest periods, use
of ICT and support from a reader/scribe. 
As noted nationally, many young people have reported
their mental health and wellbeing has been adversely
impacted as a result of the Covid-19 pandemic, where
schools have continued focus on supporting and
monitoring wellbeing while also aiming to raise
attainment and achievement for all in a very different
school experience.  AAA arrangements ensured
appropriate supports (for example, separate
accommodation) were put in place to ensure full access
to SQA examinations.  Increased anti-social behaviour
has also arisen in certain localities involving some young
people, with increase in exclusion across some schools
and lower levels of engagement.  The number of young
people requiring AAA arrangements increased which put
pressure on schools to accommodate and staff these. 
Through Universal Pupil Support, PSE and other school
based approaches, teachers supported young people in
preparation for the examination diet.  A number of
subject specialists offered Easter Revision sessions and
schools continued with study club arrangements during
the week, with practitioners offering lunchtime and after
school revision support sessions.
1,3,4,5 A,B,D,E,F

Page 60

Page 61

27
1.9
Analysis of leaver
attainment data –
February 2023 for Exam
Diet 2022 – Improving
Attainment in Literacy
and Numeracy
Improving attainment in Literacy and Numeracy 
This measure presents the percentage of leavers
achieving an award in Literacy and Numeracy at Scottish
Credit and Qualifications Framework (SCQF) Levels 4 and
5 by the end of their school experience in Moray,
compared with pupils with identified similar
characteristics across Scotland (VC - Virtual Comparator)
for each of the last five years.  This is shown in graph form
below for Moray (all leavers, percentage attaining Literacy
and Numeracy at SCQF level 4 and 5). 
Overall, Moray has performed positively and above the
Virtual Comparator for leaver attainment for Literacy and
Numeracy at SCQF level 4 and level 5.  This year is the first
in a five year trend that performance has exceeded the
Virtual Comparator across all four measures reported
above.   
Through reviewed approaches to Broad General
Education (BGE) tracking and monitoring and further
recruitment to Moray’s Quality Assurance and
Moderation Support Officer (QAMSO) group,
strengthened teacher professional judgments and data
review in the BGE will continue to reinforce foundations
for Senior Phase attainment.  Earlier identification and
intervention in relation to identified attainment gaps
should result supporting Senior Phase pathways and
attainment.  QAMSO training is now complete with the
National Improvement Framework Officer with
moderation plan and activities for Moray now planned for
the session, supported by central officers and QAMSOs in
support of strengthened Teacher Professional
Judgements.  Senior Leaders supported by wider
colleagues including PTs Raising Attainment/Equity/
Alternative Curriculum track, monitor and enact targeted
interventions in order to strength learner achievement 
of highest level of Literacy and Numeracy by school point
of exit.  As part of revised Moray Improvement Group
structure, development of revised Moray Literacy and
Numeracy Strategies in line with current thinking and
practice will support improvements in Literacy and
Numeracy attainment for all children and young people. 
1,3,4,5  A,B,D,E,F

Page 61

Page 62

28 
1.10
Analysis of leaver
attainment data –
February 2023 for Exam
Diet 2022 – Improving
Attainment for All
Improving attainment for all 
This measure allows us to examine how different ability
cohorts are attaining in relation to the appropriate virtual
and national cohorts.  Attainment is measured using the
tariff scale, which was developed for Insight.  This
allocated a specific number of points to each qualification
(including non-examination, unit-based courses).  More
demanding qualifications gain more points than less
demanding ones and in graded courses, a grade ‘A’ is
equivalent to more points than a grade ‘C’ for example,
within the same course 
Three ability cohorts are identified for each school, the
VC, the Northern Alliance (Regional Improvement
Collaborative) and Scotland as a whole (The National
Establishment):  those in the lowest 20% of tariff points
achieved, those in the highest 20% and those that fall
within the middle 60% of tariff points achieved based on
the courses they have undertaken and completed. 
Complementary tariff is a score that looks at parity of
achievement of young people in their top five
qualifications studied.  It is not affected by the number of
qualifications and units a young person completed; this
removes the inequality and anomalies with different
curriculum structures across Scotland of which there are
many.  Reasons included quality of pass and level of study
can impact on the overall tariff measure, requiring schools
to continue to work with young people and families in
raising aspirations in order to aim high for positive
achievement.   
Recent work on curriculum choice and innovation, working w
Education Scotland in collaboration with our Moray Secondar
Schools and through recent ADES-Education Scotland
Collaborative Improvement event focused on Senior Phase
Curriculum will progress further work on curriculum design fo
strengthened consortia working and senior phase offers. 
It is noted that the lowest 20% of leavers are marginally
above the VC, the middle 60% and highest 20% below
the VC.  Schools have continued this session to support
young people as longer term impact of the pandemic
continues to be realised through attendance, health and
wellbeing concerns reported.  Challenging behaviours
exhibited by a minority of young people require schools
to creatively support young people and their families,
impacting on resources and staffing capacity.  We
continue to work with multi-agency partners in support
of children and families, with increased societal
pressures and demand on partner services impacting on
school resources.     
1,3,4,5  A,B,D,E,F

Page 62

Page 63

29
1.11
Analysis of leaver
attainment data –
February 2022 for Exam
Diet 2021 – Leaver Initial
Destinations
This measure shows the percentage of young people
securing an initial positive post-school destination when
the leave school at their point of exit in S4, S5 or S6. 
Destination figures reflect choices made by pupils along
with opportunities available to them upon leaving school. 
The availability of particular opportunities (e.g.
apprenticeships and employment opportunities) extend
options available to school leavers.  As a result, this may
have impact on the number of young people progressing
on to Further and Higher Education as destination
pathways. 
In Moray, for 2021/2022 we perform above national
average at 96.2% compared with 94.08% in 2020/2021
and 93.07% in 2019/2020 and for the first time in 5 years,
Moray is above all key benchmark comparators as
outlined above.  Nationally, 95.74% of leavers were in an
initial positive destination compared to 95.48% in
2020/2021. 
The number of young people entering employment,
Further and Higher Education contribute most to initial
positive school leaver destination figures, with percentage
of young people entering employment in particular this
session as an initial positive destination, notably above
key comparators at 36.86%.   Where Covid-19 may have
had impact on availability of opportunities for young
people, this did not restrict prospects for our young
people in Moray.  We continue to work with Skills
Development Scotland (SDS) in order to strengthen
support and advice for young people as they progress on
chosen pathways to initial post-school destinations. 
In comparison with the 2020/21 leaver cohort, it is noted
that numbers entering employment in 2021/22 was
notably higher, with drop in numbers entering Further
and Higher Education also witnessed as highlighted in
yellow.     

Page 63

Page 64

30 
Those young people who are unemployed not seeking and
unemployed seeking are below or in line with key
comparators respectively, lower than session 2020/21. 
Our schools continue to work with key partners through
pathway planning meetings to ensure pupils at more risk
of negative destinations are supported, during and post-
school.  We continue to reduce percentages in these
categories to as near to zero as possible, noting impact of
wider factors (for example, mental health and wellbeing)
on initial positive post-school destination of identified
young people. 
Work also continues with key partners including Skills
Development Scotland and DYW Moray to ensure Moray
learners are informed and afforded opportunities to
progress on to chosen post-school pathways based in
individual desires and talents.  We continue to analyse our
key data on leaver dates, destinations and routes to
success to support for young people, in order that they
may succeed in their chosen journeys. 
Of the 963 Moray school leavers in 2021/22, 3.2% were
ranked as living in the 20% most deprived areas (quintile
1) of Scotland, compared to 10.4% of leavers residing in
areas ranked in the 20% least deprived (quintile 5) in
Scotland. The majority of school leavers in Moray lived in
either quintile 3 (33.0%) or quintile 4 (40.3%) areas.
87.1% of leavers from quintile 1 progressed onto a
positive destination, this compares to 98.0% for the least
deprived from quintile 5.   Initial leaver destinations for
quintile 2 was 97.6%, decreasing to 94.3% for quintile 3
and 97.4% quintile 4.  
The rate of leavers entering Higher Education generally
increases with deprivation, with the fewest entering HE
from SIMD quintile 2 (21.4%) and the highest proportion
entering from quintile 5 at 38.0%.  The opposite is true for
Further Education, with the lowest rate in SIMD 
quintile 5 (17.0%) and the highest from quintile 2
(38.0%).  The rate of leavers entering employment has
increased across all SIMD quintiles compared to last
year, with SIMD quintile 5 leavers having the highest
proportion at 41.0% followed closely by quintile 2
(40.5%).   The table below provides a summary of the
percentage of S5 and S6 students who have stayed on
into the 2022/23 academic year based on their S3
cohort; as well as the proportion of leavers in 2021/22
who moved onto an initial positive destination,
highlighting variability across schools. 
1,2,3,4,5  A,B,D,F 
Page 64

Page 65

31
1.12
Analysis of leaver
attainment data –
February 2022 for Exam
Diet 2021 – Attainment
versus Deprivation
Tacking disadvantage by improving the attainment of
lower attainers relative to higher attainers 
The graph (right) shows 2021/22 leaver attainment data
(using complementary tariff scores) for Moray against the
Virtual Comparator, broken down into the ten deciles
according to the Scottish Index of Multiple Deprivation
(SIMD).  Decile 1 refers to attainment of young people
living in areas with postcodes considered the 10% most
deprived in Scotland according to SIMD.  Decile 10 refers
to those young people living in postcodes identified as the
10% least deprived datazones according in SIMD.  We
continue to monitor the use of SIMD as a measure in
authorities where rural poverty and other wider poverty
related factors are of concern; however, these are not
fully considered nationally within SIMD classification. 
The highest number of young people leaving school in
Moray in 2021/2022 were within SIMD deciles 4-8.  It is
noted that while performance at SIMD decile 5 is in line
with the VC, some young people in deciles 4, 6, 7 and 8
performed less well in comparison with VC.  Vertical lines
within each SIMD show the range of attainment for young
people within each decile, noting both positive and less
favourable attainment for a variety of reasons as noted
previously.  As shown by trend lines, as SIMD decile
increases to SIMD 10, a small attainment gap emerges as
the SIMD increase between Moray and the VC. 
In Moray, we continue to work with our children and
young people, and their families in order to raise
aspirations and encourage positive attendance and
engagement.  Legacy impact of the Covid-19 pandemic is
noted through school attendance levels, increase in less
favourable behaviours with some young people impacting
on wider school community and secondary school
temporary/short term exclusions.   
I
Following the Association of Directors for Education
Scotland (ADES)-Education Scotland Curriculum
Innovation event in March, we look forward to planning
our curriculum for the future, working further in
partnership across our schools and with Moray College
UHI to enhance our curriculum for all.  We continue to
participate in key national reform on the curriculum
underway through review based activities, with a view to
maximising achievement of all learners, in graded and
ungraded qualifications and curriculum experiences as
we look to the future. 
1,3,4,5  A,B,D,E,F 

Page 65

Page 66

32 
1.13
Ensure positive
participation of 16-19
year olds – continued
support of this group
through targeted support
and interventions
Participation rate for 16-19 years olds is 91.6%; a
decrease of 0.2% from session 2020/2021, ranking Moray
as 23/32 and marginally below the National average
(92.4%). 
Work has continued across the partnership with issued
identified in 18 and 19 year old participation in particular. 
This led to a Short Life Partnership Working Group with
Moray College UHI, DYW and SDS colleagues following
Stretch Aims setting and attempts to address the number
of Unconfirmed status young people.
As a result of continued partnership working across our
key partners, early indications would show that a
reduction in unconfirmed status has been achieved in
the new session.  This has included work with the post-
16 team and direct enquiries with young people in order
to ascertain future status and destinations. 
Future work will continue across the partnership in order
to continue positive progress in this measure, with
specific focus on post-school recording and follow up
with providers.  
1,2,4 A,B,C,E,F
1.14
Analysis of Achievement
of Curriculum for
Excellence levels (ACEL)
Schools are required to submit data on CfE levels for each
child in primary schools stages P1, P4 and P7 and each
young person in secondary school stage S3.  The levels
reported are Early, First, Second, Third and Fourth.     
The data collected refers to the anticipated levels of
attainment at the following stages noting this may be
earlier or later for some children and young people
depending on individual needs, as detailed from
Education Scotland. 
Level Stage
Early The end of P1
First The end of P4
Second The end of P7
Third   The end of S3
Fourth Some pupils will also achieve this by
the end of S3 
Data for secondary school pupils (S3) was not collected by
Scottish Government in 2020/2021 and was not collected
for any pupils (P1, P4, P7, S3) in 2019/2020 in recognition
of Covid-19 impact on data consistency, fit for purpose
nature and wider external pressures on school and
education authority staff. 
In order to support schools with ongoing improvements
in attainment at Broad General Education level, a
strategic approach within all Moray schools continues to
be adopted.  The development and implementation of
the following strategy areas is supporting more cohesive
and planned methodology to ensure practices to
improve attainment continue to be our Education vision
in Moray.  These are: 
 Raising Attainment Strategy and Toolkit
 Learning and Teaching Strategy and supporting
materials
 Remote Learning and Teaching Strategy and Toolkit
 Supporting All Learners Strategy
 Assessment and Moderation Guidelines
 Tracking and Monitoring Guidelines and Tracking
Tools/System
 Quality Improvement team support and challenge
regarding data analysis, tracking and monitoring and
attainment discussions with all schools 
The percentages noted directly below present the P1
ACEL data for the past 6 years for Moray in comparison
with the national averages.  Please note that there was
no Scottish Government data collected in 2019/2020: 
1,3,4,5 A,B,D,E,F


Page 66

Page 67

33
Following request for ACEL data submission for P1, P4, P7
and S3 stages, data was collected in June 2022 using our
Seemis Progress and Achievement module.  This followed
ongoing work in schools on assessment, moderation and
professional commitment to all areas of teacher
professional judgement.   
ACEL data was submitted to Scottish Government in
October 2022 following a range of Quality Assurance
processes from school staff and central officers.  The
initial data provided by schools was, in some cases,
further quality assured by central officers directly with
schools and where necessary provided with additional
support and guidance to ensure the submission of robust
and reliable data.   
The Scottish Government ACEL national data was
published in December 2022, providing a range of data
across all of Scotland’s local authorities as well as specific
cohort and characteristic data.  
_______________________________________________ 
P1:  Moray figures where highlighted in green above
indicate where performance exceeds national average;
amber indicates where performance is marginally below
and red highlight as notably below national average. P1
data for 2022 shows that all Literacy elements and
Numeracy are noted as below national averages.  The
table below shows further comparison of 2022 data with
2021 as previous year: 
Listening and Talking and Reading have each reduced by
1%.  Increase in Writing of 2% is offset by these
reductions, resulting in Literacy (overall) remaining at
69%, common with 2021.  Numeracy ACEL remains at
78%. 
P1
P1
P4
Page 67

Page 68

34 
P4:  Moray figures where highlighted in green above
indicate where performance for P4 exceeds national
average; amber indicates where performance is
marginally below and red highlight as notably below
national average. P4 data for 2022 shows that all Literacy
elements and Numeracy are noted as below national
averages.  The table to the right shows further
comparison of 2022 data with 2021 as previous year: 
The percentages in table form to the left present the P4
ACEL data for the past 6 years for Moray in comparison
with the national averages.  Please note that there was no
Scottish Government data collected in 2019/2020.
_______________________________________________ 
The percentages noted below present the P7 ACEL data
for the past 6 years for Moray in comparison with the
national averages.  Please note that there was no Scottish
Government data collected in 2019/2020: 
Listening and Talking is marginally below 2021 ACEL (1%)
with Reading in line with 2022 (73%).  Writing is 1%
above 2021 ACEL with Literacy overall remaining the
same at 61%.  Numeracy has witnessed increase of 5% in
ACEL to 69%, from 64% in 2021. 
______________________________________________ 
P7:  Moray figures where highlighted in green to the left
indicate where performance exceeds national average;
amber indicates where performance is marginally below
and red highlight as notably below national average. P7
data for 2022  shows that all Literacy elements and
Numeracy are noted as below national averages.  The
table below shows further comparison of 2022 data with
2021 as previous year: 
Listening and Talking, Reading and Writing have
witnessed increase on 2020/ 2021 Moray ACEL averages,
resulting in 3% increase in Literacy overall, with largest
increase noted in Writing (6%).  Numeracy has also
witnessed 7% increase in ACEL average from 62% in
2021 to 69% in 2022. 
P4
P7
P7
Page 68

Page 69

35
The percentages noted below present the S3 ACEL data
for the past 5 years for Moray in comparison with the
national averages for ACEL 3rd level and ACEL 4th level. 
Please note that there was no Scottish Government data
collected in 2019/2020 or 2020/2021 for S3 pupils: 
Moray figures where highlighted in green above indicate
where performance exceeds national average; amber
indicates where performance is marginally below and
red highlight as notably below national average. S3 data
for 2022 at 3rd and 4th level ACEL achievable in S3 shows
that all Literacy elements and Numeracy are noted as
below national averages.  The table below shows further
comparison of 4th level 2022 data with 2019 as last
nationally published ACEL data by Scottish Government
as a comparator data set: 
Listening and Talking, Reading and Writing have
witnessed increase on 2018/2019 Moray ACEL averages
at 4th level, resulting in 13% increase in Literacy overall,
with largest increase noted in Reading and Writing
(14%).  Numeracy has also witnessed slight 1% decrease
in ACEL average from 56% in 2019 to 55% in 2022. 
While Primary data is below national averages overall,
improvement (year to year) based on Moray data is noted
(2020/2021 to 2021/2022) in data presented above. This
includes P1 Writing, P4 Writing and Numeracy, and P7
Listening and Talking, Reading, Writing and Numeracy.
Primary 1 Literacy (overall) and Numeracy have remained
at previous year’s levels, common with P4 Reading and
Literacy (overall).  Marginal 1% reductions are noted in P1
Listening and Talking and Reading and P4 Listening and
Talking.  While Secondary data is below national averages
overall, improvement based on last year of data
publication (2018/2019) is notably higher in S3 at 4th level
Reading, Writing, Listening and Talking, Literacy (overall)
with marginal 1% reduction in Numeracy at 4th level. 
Literacy (all components and overall) at 3rd level are of
S3
Page 69

Page 70

36 
On review of data sets presented and on further detailed
analysis at individual school level, support and challenge
discussions have followed between the central Quality
Improvement team and Head Teachers regarding data
submitted and security of ACEL teacher professional
judgements on learner level achievement.    
In Primary, this has been undertaken through central
Quality Improvement  Visits during Term 1 and Term 2
focused on revised Quality Framework for Learning and
Teaching focused on How Good Is Our Schools? version 4
Quality Indicator 2.3 (Learning, Teaching and
Assessment). 
In secondary, this has been undertaken through virtual
and extended in-person Secondary Improvement Model
visits supported by revised processes linked to our
Secondary Attainment and Performance Framework
during term 2, with further support and challenge visits
planned to identified secondary schools in Term 3. 
The initial Strategic Head Teacher Meeting in September
2022 further focused on ACEL data over time and review
as an Associated Schools Group of Head Teachers for
planning interventions for improvement.  This has led to
redevelopment of action plans within a number of
Associated Schools Groups with focus on cross-stage and
cross-sector moderation and professional learning
activities. 
In term 4, as part of our revised Moray Quality
Improvement Framework, central Quality Improvement
team undertook visits across our schools with specific
focus on Achievement of Curriculum for Excellence level
scrutiny, discussion and challenge on data rigour.  This
supported Stage 1 and Stage 2 Quality Assurance activities
in June and August 2023.
note, below 2019/2019, with Numeracy marginally below
2018/2019 and national average.
______________________________________________ 
We continue with the following activities:
 Continued strengthening of Moray’s approaches to
Moderation for ACEL TPJ through the Moray Quality
Assurance and Moderation Support Officer (QAMSO)
group and Moderation training and guidance
 Stretch Aims will be used as a focus for future
improvement activities with further work underway
on reviewing Core plus Stretch Aims in line with
revised national guidance
 Continued emphasis on provision of high quality
learning experiences in line with Our Moray
Standard for Learning and Teaching and local school
context interpretation and focus areas
 Continued moderation activities in our schools,
within and across stages to ensure shared
understanding of national standards for learner
achievement of a level
 Moderation activity between schools and within
Associated Schools Groups (ASGs) for shared
understanding across Moray of ACEL and application
of national benchmarks
 Continued school engagement with key learning
progressions developed by the QIO BGE Curriculum,
with further promotion to Secondary Schools in
support of learner curriculum transitions
 Continued quality assurance of curriculum content
and coverage including quality of play based
approaches in line with Moray’s Play Strategy to
ensure learner attainment is maximised by point of
P1 ACEL
 Continued development and roll-out of the revised
Secondary Improvement Model (SIM), reviewing visit
programme and evaluative visit reporting for
improvement 
Page 70

Page 71

37
1.15
Continue to support
Head Teachers in use of
Scottish Attainment
Challenge (PEF, SEF,
CECYP) funding to
identify and target
groups and individual
pupils and in particular,
those affected most by
poverty – extend use of
data and tracking
approaches, leadership
at all levels, curriculum
and wellbeing
developments to support
closing identified
attainment gaps
informed by self-
evaluation using internal
Moray mechanisms
Supported by our Education Scotland Attainment Advisor,
Scottish Attainment Challenge monies pertaining to Pupil
Equity Funding (PEF), Strategic Equity Funding (SEF) and
Care Experienced Children and Young People Fund (SEF)
has resulted in a number of key work areas being
progressed or completed in relation to SAC. 
Three tri-annual reports have been completed in
partnership with us and submitted to Education
Scotland/Scottish Government, highlighting progress and
next steps with delivery of the Scottish Attainment
Challenge in Moray.  Summary is provided as follows: 
The “Moray Practitioner’s Guidance” was updated in line
with the recently published PEF national operating
guidance and Scottish Attainment Challenge (SAC)
Framework for Accelerated Progress and Recovery. This
task was undertaken collaboratively between the
attainment advisor (AA) and Local Authority (LA) lead
central officer. This is now available to all staff within
Moray. 
Moray is reviewing tools for tracking and data analysis.
Moray has achieved a 100% roll-out of SEEMiS Progress
and Achievement training with plans for data literacy
sessions and tool to support analysis completed by end of
next academic year. 
The education central team in collaboration with social
work colleagues have recruited and appointed a virtual
head teacher for Care Experienced Children and Young
People who will lead on the actions in support of CECYP. 
As part of the “Supporting all Learners” (SAL) strategy,
nurture training was delivered to staff via the SAL strategic
group in the November Inset days. 
Clarification of PEF carry over and remaining budget for
the 21/22 academic session; strong progress has been
made in understanding PEF carry over and forecast. A
Quality Improvement Manager, alongside finance
colleagues, have worked hard to collate this information
and disseminate it accordingly. Working in partnership
with our Attainment Advisor, this has resulted in
underspend being significantly reduced within six months.
However, there continues to be a risk attached to this. The
central team is reflecting on lessons learned and are
exploring creative ways to mitigate risks moving forward. 
The lead central officer and the attainment advisor (AA)
will continue to support outcomes and measures for
Strategic Equity Fund (SEF) proposals. Significant progress
has been made and monthly meetings have taken place
with the SEF project leads. Recruitment of key posts has
taken place. Driver diagrams have been developed to
capture high level aims into smaller manageable goals.
Impact will start to be captured and measured against
original proposals in term four. 
From the ADES-Education Scotland Collaborative
Improvement Sessions that took place in March, priority
areas have been identified, which will support attainment
and stretch aims. Feedback from the Collaborative
Improvement session has evidenced the need for a co-
created, holistic plan to focus on: 
 Improved learning, teaching, and assessment to
meet the needs of all learners
 Improved curriculum to meet the needs of all
learners
 As part of this, the outstanding additional support
needs review will be concluded 
 Empowered leadership at all levels
1,2,3,4,5 A,B,C
D,E,F

Page 71

Page 72

38 
1.16
Review and consolidate
implementation of 1140
hours including quality of
experience
Following agreement of the Education, Children’s and
Leisure Services Committee, an external consultant was
appointed to undertake a review of the Early Years’
Service, supporting identification of key changes for
service sustainability and improvement due to overspend
in revenue budget identified during the course of the
year. 
Further work has been undertaken by the Early Years’
Service in progressing key actions identified relating to
1140 hours expansion.  A range of professional learning
and development opportunities, CPD sessions and further
roll-out of the Moray Play Strategy has taken place.  Based
on feedback from the external consultant, service review
continues for best practice and best value for the council.
Play pedagogy has featured as a focus in the
2022/2023 training session. A majority of primary
schools are engaging and working with ‘Moray Play’
and responsive planning approaches are taking
place, in which equity features for child-centred
pedagogical approach. 
Networking sessions are facilitated on a termly basis
to allow staff to connect with each other and share
practice. Practitioners report that they have an
increased awareness and understanding of the
poverty-related attainment gap and how
pedagogical approaches such as play can help to
tackle this gap. Recent training by Greg Bottrill was
well received with high attendance recently as
highlighted in case study further below (see p58). 
1,2,3 A,C,E,F
1.17
Continue to develop
approaches to raising
attainment and
achievement across
Moray, building data
literacy capacity across
our system to support
improvements in
performance 
A range of approaches have continued as noted above in
order to raise attainment and achievement as well as
build data literacy across our system.   
Stretch Aims were set following discussion with Education
Scotland Senior Regional Advisor, National Improvement
Framework Officer and Attainment Advisor.  These have
been set in line with National Guidance and link to Broad
General Education Achievement of Curriculum for
Excellence levels, SCQF all candidates and leavers for key
attainment measures as well as wider Health and
Wellbeing measures linked to attendance, exclusions and
FSM.  Further scrutiny by Scottish Government followed
leading to finalised Stretch Aims for gauging local
authority progress and identification of next steps. 
Targeted use of Scottish Attainment Challenge monies
including Strategic Equity Funding to support localities of
greatest need to raise attainment due to poverty related
and wider factors, using data as a key driver has been
adopted. Further data interrogation and review at local
authority level as social and economic changes continue
to emerge for closing identified gaps, has been
undertaken.   
Through reviewed approaches to Broad General
Education (BGE) tracking and monitoring and further
recruitment to Moray’s Quality Assurance and
Moderation Support Officer (QAMSO) group,
strengthened teacher professional judgments and data
review in the BGE will continue to reinforce foundations
for Senior Phase attainment.  Earlier identification and
intervention in relation to identified attainment gaps
should result, supporting Senior Phase pathways and
attainment. 
We continue to review data systems to ensure they
remain fit for purpose and explore wider potential for
data dashboarding for increased timeliness of data
extraction and analysis for identifying attainment gaps.  
Targeted support to schools is provided by officers as
required.  Increased focus on tracking and monitoring
learner progress and achievement throughout the year
in S1 to S3, with further early indication progress checks
with schools in the lead up to June ACEL census further
informs our progress and where improvements/
interventions are needed.
1,2,3,4,5 A,D,E,F


Page 72

Page 73

39
1.18
Review and develop
wider performance
indicators to support
improvement –
Attendance and
Exclusions
Due to Covid-19, National gathering of the following
measures was paused, with analysis resuming in 2021: 
Attendance 
Attendance rates are on average lower for young people
from the more deprived areas (deciles 1-5) when
compared to those from the least deprived areas (deciles
6-10).  Primary school attendance rates range from 88.3%
(decile 2) to 94.3% (decile 9), a variance of 6.0 percent. 
The secondary school attendance rates show a wider gap
in attendance when using SIMD data, with attendance
rates ranging from 84.1% (decile 3) up to 92.2% (decile 9),
an 8.1 percent variance.   
With just over 33% of Moray pupils ranked in SIMD
deciles 1-5 based on their postcode, the lower attendance
rates for this group will impact on their learning and
school leaver options and overall attainment measures.   
Maximising school attendance continues to be area of
focus, with collaborative revision of our attendance policy
planned.  Our Educational Psychology team are working
with colleagues across the Northern Alliance with a view
to supporting work moving forwards in this area. 
Exclusions 
In 2021-22, a total of 173 school exclusion incidents were
recorded in Moray, the same number of incidents
recorded in the previous year and the equal lowest level
recorded over the last ten years.  The impact of COVID-19
pandemic has affected exclusion due to the necessity for
home learning during the previous two academic year,
and as such care has to be taken in comparing exclusion
numbers over the with Covid years.       

Page 73

Page 74

40 
National exclusion data is reported every second year; the
graphs to the right compare exclusion rates for Moray
with our comparator LGBF authorities and the national
average since 2014/15.  Exclusion rates in Moray at
Primary school level have continued to decline since
2012/13, as with our comparator authorities and
nationally there has been a notable reduction in exclusion
rates in 2020/21.  The rate of exclusion in Moray for
2020/21 was 3.0 per 1,000 pupils, below the national rate
(3.6) and ranking Moray 4th within out comparator group.   
Moray Secondary exclusion rates reduced in 2020/21,
with a rate of 29.1 cases per 1,000 pupils.  The rate of
exclusion is above the national average (22.1), while
Moray ranks 7th out of our comparator group.  COVID-19
has contributed to the fall in exclusion cases for 2020/21,
however the development and implementation of the
authority wide policy on exclusion and approaches to
inclusion accompanied by clear guidance and intervention
strategies has helped reduce case numbers, particularly at
primary stage. 
Schools continue to report concerns regarding
behaviours, wellbeing, mental health and impact on
learner outcomes and attainment.  This has resulted in
increased behaviours of concern in schools, with pressure
on partnership capacity impacting on wider supports
available to schools.  As a result, existing in-school staffing
and wider resources require to be directed to support
young people individually/in small groups by schools,
impacting on wider school agenda of improving outcomes
for individual pupils, groups and cohorts.  This may result
on occasion in exclusion from school due to difficulty in
maintaining the safety and wellbeing for all – particularly
in secondary – with our schools keen to support all young
people and their identified challenges and needs.       
1,2,3,4  A,C,E,F 
Page 74

Page 75

41
Scottish Index of Multiple Deprivation Profile (SIMD) 
The Moray Scottish Index of Multiple Deprivation (SIMD) profile is shown in tabular form below.  SIMD Quintile 1 refers to young people with postcodes within datazones
identified as being in the 20% most deprived in Scotland according to SIMD, whilst Quintile 5 refers to those young people with postcodes in the top 10% of the least
deprived datazones according to SIMD. In the 2016 SIMD Moray had no datazones ranked in the lowest decile 1 (within Quintile 1), however in the refreshed 2020 SIMD
Moray has one datazone in decile 1.  From the profile below, most children and young people in Moray are within Quintile 3 (decile 5 and 6) and Quintile 4 (decile 7 and
8) datazones. 
SIMD (%)
STAGE
No.
Pupils
Quintile
1
Quintile
2
Quintile
3
Quintile
4
Quintile
5 Unknown
P1 945 3.9% 14.9% 29.6% 37.7% 11.9% 1.9%
P4 981 2.9% 12.6% 30.6% 38.4% 13.7% 1.8%
P7 1037 3.3% 13.2% 31.4% 39.2% 11.0% 1.9%          
S3 1077 4.5% 13.1% 32.1% 37.2% 11.2% 1.9%          
S4 923 3.7% 13.0% 32.1% 38.9% 10.2% 2.0%
S5 672 3.0% 15.5% 31.8% 37.1% 11.1% 1.6%
S6 443 3.9% 9.7% 31.8% 41.0% 12.2% 1.5%        
MORAY 12, 212 3.4% 14.3% 30.6% 38.1% 11.6% 2.0% 
Developing the Young Workforce Moray 
We continue to extend learning through work based learning world of work experiences and
learning opportunities across our schools, supported by our DYW School Coordinators and led
by the DYW Programme Manager in order to enrich educational experiences for our children
and young people.  This includes through activities highlighted throughout this report, as
valued partners in our curriculum development and education delivery model as well as
through enhancing our learner awareness of future careers and the world of work.  Key
projects this year have included the Baxters Soup Challenge, Careers Events, Enterprise based
activities and employer led programmes across our schools.  Please see case study example
(p13) and twitter post pages (p65-68) further below, for engagement examples. 
Where it is noted that a number of key improvements have resulted in
trend performance, in Moray we continue to focus on key identified
measures aligned to our improving outcomes agenda as reported to
Moray’s Education, Children’s and Leisure Services Committee.  We
progress with key actions as year two of our core priorities, aligned to
key national and local guidance, policies and emerging good practice
from looking outwards to other local authorities across Scotland and
beyond. 
Page 75

Page 76

42 
Supporting our Care Experienced Children and Young People – Scottish Attainment Challenge (Care Experienced Children and Young People Funding) 
Page 76

Page 77

43  Page 77

Page 78

44     Page 78

Page 79

45   Page 79

Page 80

46     Page 80

Page 81

47
Progress towards Stretch Aims 
Stretch Aims were set in September 2022 for 2023, following request from Scottish Government and Education Scotland as part of the Framework for Recovery and
Accelerating Progress (v1.0).  This resulted in overall Stretch Aims being set for Core measures set by Scottish Government consisting of an overall Stretch Aim and
subsequent Quintile 1 and Quintile 5 Stretch Aim measures.  In Moray and as indicated on the table on page 41 above, we have a low proportion of young people in SIMD
Quintile 1 overall and within stages (3.4% overall).  Request from the Scottish Government to provide a Quintile 1 Stretch Aim was accepted in order to support national
aggregation for further National measures.  Our Stretch Aims set were as follows for 2022/2023 with the following contribution of 2021/2022 to their achievement: 
2022/2023: Stretch Aim 2022/2023: Stretch Aim 2022/2023: Stretch Aim 2022/2023: Stretch Aim 2022/2023: Stretch Aim
Overall Q1 Q5 Overall Q1 Q5 Overall Q1 Q5 Overall Q1 Q5 Overall Q1 Q5
67.0% 62.0% 80.0% 73.0% 66.0% 82.0% 93% 89.4% 94.1% 90.5% 70.0% 96.5% 66.0% 46.5% 78.5%
Gap – Q1-Q5 Gap – Q1-Q5 Gap – Q1-Q5 Gap – Q1-Q5 Gap – Q1-Q5
18.0% 16.0% 4.7% 26.5% 26.5% 
As noted through our Scottish Attainment Challenge and Education Scotland joint reporting through tri-annual reporting, the following commentary is made against
progress to date in 2021/2022 with core published Stretch Aims (national publication, December 2022): 
ACEL – Primary School (P1/4/7) Literacy:
In 2021-2022, overall levels of attainment in literacy for P1,4,7 combined, improved by 1.1% when compared to 2020-2021.  There has been no improvement in attainment
compared to 2018-19 data. Current performance is below the national average by 6%.  Achievement of stretch aims for literacy (combined) would see improvements in
levels of attainment of 2%, which would lead to a decrease of the poverty-related attainment gap from 26% to 18%.
ACEL – Primary School (P1/4/7) Numeracy:
In 2021-2022, overall levels of attainment in numeracy for P1,4,7 combined, improved by 4% when compared to 2020-2021 levels. 2021-2022 data illustrates signs of
recovery in relation to pre-pandemic performance with an 8pp increase when comparing 2021-2022 and 2018-19 data. Although there have been improvements, levels
are below the national average by 6%.
Senior Phase
1 or more pass
@ SCQF level 5
or better
(leavers)
Senior Phase 
1 or more pass
@ SCQF level 6
or better
(leavers)
BGE 
ACEL P1/4/7
Literacy
[combined]
BGE 
ACEL P1/4/7
Numeracy
[combined]
Annual
Participation
Measure
Page 81

Page 82

48  
Annual Participation Measure:
There is a marginal decrease in the overall annual participation levels from 91.8% in 2021 to 91.6% in 2022. This is 0.8% below the national average. Despite this, data
indicates that there is a narrowing of the poverty related attainment gap for quintile 1 v quintile 5 of 1.7pp. A 1.4% increase of overall levels is required to achieve the
stretch aim. There has been a positive increase in the initial leaver destinations in 2022, which is above all comparators for first time in five years. 
Senior Phase:  1 or more pass at SCQF level 5 or better:
Overall levels of attainment in this measure have increased by 0.02 percentage points (pp) to 86.60% of all school leavers achieving one or more qualifications when
compared to 2021. The percentage of leavers from quintile 1 achieving this measure has increased by 18.16pp. The poverty-related attainment gap has reduced
considerably from 2020-2021. The gap has decreased from 36.93% to 10.58% in 2021-2022. This demonstrates a 26.35pp improvement. Therefore, the stretch aim for
this measure has been achieved.
Senior Phase:  1 or more pass at SCQF level 6 or better:
Overall levels of attainment in this measure have decreased by 5.01pp to 55.97% of all school leavers achieving one or more qualifications when compared to 2021. The
percentage of leavers from Quantile 1 achieving this measure has increased by 4.90pp. The poverty-related attainment gap has reduced considerably from 2020-21. The
gap has decreased from 39.15% to 21.06% in 2021-2022. This demonstrates an 18.09pp improvement. Therefore, the stretch aim for this measure has been achieved. 
Looking to the future – 2023 – Progress towards Stretch Aims: 
In April 2023, the Scottish Government and Education Scotland revised the Framework for Recovery and Accelerating Progress following feedback from the wider Education
System on the Stretch Aim process, setting stretch aims and measures used.  In Moray, this was particularly significant where SIMD Quintile 1 and SIMD Decile 1 contain
few pupils.  The Scottish Government have since published revised guidance and as a local authority, we look to streamline the Core-plus measures first identified in order
to strengthen focus on key things that will make the greatest difference in improving outcomes for our children and young people in Moray, in line with all guidance. 
Broad General Education Senior Phase Annual Participation Measure Health and Wellbeing Core+ Stretch Aims
Based on early indication data,
the local authority is confident
that the 2023 stretch aim for
literacy P1/4/7 combined will
be achieved. 
Based on early indication data,
the local authority is confident
that the 2023 stretch aim for
numeracy P1/4/7 combined
will be achieved. 
Based on early indications, the
local authority is optimistic
regarding leaver achievement
in regard to SCQF level 5.  Due
to impact of post-pandemic
behaviours, wellbeing concerns
and attendance, the local
authority is uncertain based on
early data runs regarding
achievement of stretch aim for
SCQF level 6.  As such, in line
with revised guidance, revision
to stretch aims based on
current contextual information
and operating conditions may
now be actioned.
Based on local intelligence
and early indication data
from Skills Development
Scotland, the local authority
is confident that the stretch
aim for APM will be achieved.
Significant work has been
undertaken to identify and
track ‘unconfirmed status’
pupils. 
Due to this focus, this
percentage is now down 2.4
percentage points to 2.9%,
which is below the national
average of 3.6%. 
An analysis of SEEMiS data and
violence and aggression forms
suggests that the stretch aims
for attendance and exclusions
will not be achieved (see p39-
40 above for data overviews). 
Addressing this is an area of
priority identified within the
service, with further work
during this year.  In particular,
attendance within a number of
secondary schools remains of
concern and lower than pre-
pandemic levels as well as
identified Primary Schools.
Based on early indication data,
it is anticipated that the
majority of core plus stretch
aims will be met. Revision of
core plus stretch aims is taking
place, to ensure that a
manageable number of core
plus stretch aims are selected
and monitored for the 2023-
2026 reporting period, in line
with the revised national
guidance.  Early analysis would
show narrowing of attainment
gap (Q1-Q5) across a number
of measures identified.
Page 82

Page 83

49
Overall, key Performance and Improvement highlights for Moray are as follows, with internal analysis of core stretch aims continuing
as we revise Stretch Aims based on national guidance issued in April 2023: 
2018/2019 2019/2020 2020/2021 2021/2022
S4:  % pupils attaining level 4 Literacy and Numeracy 78.9% 86.9% 87.1% 89.0%
S4:  % pupils attaining level 5 Literacy and Numeracy 46.2% 53.6% 49.5% 53.9%
Leavers:  % pupils attaining level 4 Literacy and Numeracy 84.9% 86.4% 92.2% 92.1%
Leavers:  % pupils attaining level 4 Literacy 93.3% 93.0% 95.9% 95.5%
Leavers:  % pupils attaining level 4 Numeracy 87.2% 88.5% 93.3% 93.9%
Leavers:  1+ @ SCQF4 or better 96.4% 95.2% 96.8% 98.23%
Looked After school leavers:  1+ @ SCQF4 or better 76.9% 68.4% 75.0% 81.8%
Proportion of pupils entering Positive Destinations 92.8% 93.1% 94.1% 96.2% 
Areas for further improvement are identified as follows: 
2018/2019 2019/2020 2020/2021 2021/2022
Leavers:   % achieving 5+ @ SCQF6 29.5% 34.2% 34.2% 29.8%
% Participation for 16-19 year olds 91.3% 93.5% 91.8% 91.6%
Secondary (S3) ACEL Literacy – 3rd level or above 83% * * 72%
Secondary (S3) ACEL Numeracy – 3rd level or above 92% * * 86%
Leavers:   % achieving 5+ @ SCQF5 61.6% 61.9% 65.8% 63.14%
% of S4 pupils gaining 5+ @ SCQF level 5 42.7% 46.7% 48.2% 46.9%
% of S5 pupils gaining 5+ @ SCQF level 6 19.9% 19.2% 20.8% 18.1%
% of S6 pupils gaining 1+ @ SCQF level 7 38.2% 42.4% 44.1% 40.6%
*No data collection by Scottish Government in 2020 and 2021 due to Covid-19 pandemic  
Longer term impact of the pandemic on children and young people continues to be mitigated against by our schools 
Performance continues to be monitored by our central Quality Improvement team, informing schools improvement and determining where support and challenge is required
in order to improve outcomes for all children and young people.  Please see page 19-41 above for analysis of wider measures. 
An analysis of SEEMiS data and violence and aggression forms suggests that the stretch aims for attendance and exclusions will not be achieved. Addressing this is an area
of priority identified by our service.  Based on early indication data, it is expected to meet most core plus stretch aims. Revision of core plus stretch aims is taking place, to
ensure that a manageable number of core plus stretch aims are selected and monitored for the 2023-2026 reporting period, in line with the revised national guidance
(Framework for Recovery and Accelerating Progress, May 2023). 
Page 83

Page 84

50  
50
Supporting our Care Experienced Children and Young People
Spotlight on… 
Joe (name changed for anonymity) has had significant Social Work involvement throughout his teenage
years due to ongoing negative interactions with Police Scotland due to behaviours exhibited in the wider
community. Relationships at home were turbulent and eventually he was placed on a Compulsory
Supervision Order. 
Joe’s attendance was poor and when in school he was unable to regulate and regularly caused significant
disturbance. Joe had significant rates of exclusion prior to COVID.  During COVID closures, the school were
given the services of an SEBN worker who visited Joe regularly and took him on wellbeing walks. This
relationship has been key in supporting Joe and continues to this day – it is highly likely that this positive
role model and mentoring relationship will continue post-school.
Joe is now on a tailored timetable attending for SEBN time, Barista, Literacy and Numeracy. Joe has a very
small team working with him ensuring that he has positive interactions around the school community. 
Joe is at the end of S4, where he will have gained Barista Level 5, Literacy Level 4, Numeracy Level 4, Level
4 Business Units. Joe is a Christmas Leaver and will continue part time in school enhancing and maximising
his Literacy and Numeracy qualifications while maintaining a long-term work experience placement in a
local coffee shop (this was as a direct result of his Barista qualification).
Joe’s interactions with Police Scotland are significantly reduced to a point where the only interactions are
positive. Joe has supported at Parents’ Evenings on the Barista project and also supported staff at Sports
Day selling and interacting with Barista customers.  The Equity team funded through school and Scottish
Attainment Challenge Pupil Equity and Strategic Equity Funding are looking at wider qualifications which
will also support Joe post-school in the lead up to Christmas 2023.
Joe has become a positive role model for younger students and continues to grow in self-confidence and
enjoys his time in school.  The school and the Senior Leadership Team are extremely proud of Joe and the
positive change over time, as a care experienced young person and valued member of their school
community.  
Page 84

Page 85

51 
Improving Outcomes for Young People
Spotlight on… Moray School Leavers 
Progress in school leaver attainment was highlighted in a report to Education, Children’s and Leisure
Services Committee in April 2023, with figures showing improvement in literacy and numeracy at SCQF
level 4 and level 5, with Moray above its national benchmark comparator for the first time in five years.  
Last year saw a return to the formal SQA examination diet after two years of alternative certification
models (ACMs) and committee members were advised that caution remains with data trends over this
time.
Over 96% of the 963 school leavers moved on to a positive destination, with most entering employment
or going on to Further and Higher Education. This was again Moray’s best performance in five years and
above the national figure.
Schools work with key partners including Skills Development Scotland and DYW Moray to support learners
to take up opportunities to progress on to chosen post-school pathways based on individual wishes, skills
and talents.
Chair of the committee, Cllr Kathleen Robertson, said: “Young people, their families, staff and partners
have worked hard to achieve these results. We look forward to building on the
positive progress to ensure all young people achieve their full potential.”
Alongside the attainment outlook, members heard that secondary schools continue
to report behaviour trends related to the Covid-19 pandemic, including higher levels
of absence. Ongoing support is provided to pupils through wellbeing, learning and
supported study opportunities.
Page 85

Page 86

52  
52
Curriculum 
In regard to Curriculum, a number of key next steps were identified and have progressed during the session.   
Priority 2 Curriculum
Action: Next Steps identified: Progress to date: NIF
Priority:
NIF
Driver(s):
2.1
Further
develop
progressive
Moray
Learner
Pathways
Further develop
progressive Moray learner
pathways in the
remaining 6 curricular
areas. 
Fully implement and
embed the Moray Play
Strategy and curricular
progressions. 
Continue to work with the
Education Scotland
Curriculum Innovation
Team to support us in our
next steps in our journey. 
Support the roll-out of
these ensuring cohesion
with ELC and senior
phase.
Literacy and HWB Early level progressions are
now developed in order to support pre-
school child transitioning into P1.   
All curricular progressions are completed to
end of second level, the last two progressions
(Technologies and Expressive Arts) completed
in August 2023.  Further roll-out and
signposting in session 2023/2024 linked to
assessment and moderation approaches. 
More work is now planned on level 3 and 4
progression development next session.  A 
Working group will be established next
session to take forward the progressions and
curricular transitions.  Schools continue to
embrace the Northern Alliance Numeracy
progression as appropriate to their settings. 
Please see further below regarding
Curriculum Innovation and Education
Scotland working with us through ADES-
Education Scotland Collaborative
Improvement event and next steps identified.
2,3,4,5 A,B,C,
D,E,F
2.2
Develop a
responsive
BGE
Curriculum,
particularly in
literacy and
numeracy
Showcase and support
development of
Interdisciplinary Learning
(IDL) aligned with each
school’s unique context
and Curriculum Rationale. 
Review the Moray
approach to Skills
progression 
Development of Literacy
and Numeracy
Progressions 
Next step is for a working group to take
forward and develop a Literacy and
Numeracy Strategy.  Draft Literacy Strategy
source materials have been gathered in
support of any future system improvement
group.   
Following reviewed Education Strategic Plan
post ADES-Education Scotland Collaborative
Improvement Event, self-evaluation and
actions identified, this work will now be taken
forward by Moray Improvement Groups 3
and 4 in session 2023/2024. 
Schools who are developing IDL have been
identified and encouraged to sign up to Day
Dream Believers Pilot project. A Quality
Improvement Officer (QIO) is part of a
national Education Scotland co-design group
in IDL. QIO has met with class and Head
Teachers who are keen to deepen their
2,3,
4,5
A,B,C,D,
E,F


Page 86

Page 87

53
practice in IDL and a training Sway is in
development to allow for flexible access to
training and to showcase quality IDL.  
2.3
Continue to
extend
collaborative
approaches to
curriculum
delivery
Key work is planned for
next session with schools
and the Education
Scotland Curriculum
Innovation team,
supporting us through
next phase of our
improvement journey in
ensuring best outcomes
for our young people in
Moray.   
Continue to consider with
secondary leaders and
wider partners,
curriculum and
accreditation
opportunities 
ADES-Education Scotland Collaborative
Improvement event successfully complete
with considerable self-evaluation gathered
from key internal and external (partnership)
stakeholders. Based on data, evidence and
views, we have formulated reviewed system
empowerment groups identified from our
wider system to support work moving
forwards. Initial meetings looking outwards in
support of wider qualifications and
accreditation.   
All schools looking outwards, embracing SQA
and SCQF qualifications.  Further next steps
identified in relation to extending curriculum
offer in light of national reviews.  SCQF
Partnership keen to showcase local authority
in relation to SCQF ambassador programme
and a local authority embracing this. 
Year one of iMpact Moray strategy complete
with range of priorities progressed to
milestone completion including curriculum,
SCQF ambassadors, SQA developments,
Curriculum Innovation and collaboration
(resulting in Moray Improvement Groups and
Curriculum Strategy group moving forwards),
enhanced partnership links.  Subject group
networks re-established and renewed focus
on assessment and moderation in the BGE
supported by May Inset refocus on
moderation.  ASG plans developed and
reviewing impact and progress.  
3,4,5 A,B,D
E,F
2.4
Further
develop
curricular
transition
approaches
Support the roll out and
implementation of Moray
curricular progressions,
ensuring cohesion with
ELC and Senior Phase
May inset successfully supported system-
wide collaboration, subject/curriculum area
and ASG working together.  Increased rigour
in moderation and understanding standards,
supporting more evidence informed ACEL
census data focus.  Considerable work
undertaken in ASGs on moderation with
plans in place for new session.
2,3,4,5 A,B,D,F
2.5
Fully
implement
and embed
the Moray
Play Strategy
Fully implement and
embed the Moray Play
Strategy 
Plan for training in new
academic session to
support strategy. This will
include further Primary
schools across Moray. 
The Northern Alliance Play Pedagogy
Collaborative opportunity was shared with all
ELC practitioners. Greg Bottrill child pedagogy
training was delivered in the May in-service
and was well attended with very positive
feedback received. During session
2022/2023, child centred approaches to
learning were supported and training
provided for staff across early level.  Outdoor
learning continued to be developed building
on approaches through the pandemic. 
2,3 A,B,D,E 



Page 87

Page 88

54  
54 
.  
Page 88

Page 89

55
- 
Page 89

Page 90

56  
56  
Page 90

Page 91

57   Page 91

Page 92

58  
58
Learning, Teaching and Assessment 
Spotlight on Child-centred Pedagogy 
During the May 2023 In-service, Greg Bottrill,
author of ‘Can I go and play now’ and ‘School
and the Magic of children’ delivered an inspiring
and uplifting week of staff development in
Moray. Nearly 300 ELC practitioners, primary
teachers, head teachers and nursery managers
participated in the in-service training over 3
days. 
The sessions were tailored around child-centred
pedagogy and the strategic priority areas for
Moray Education; Learning, Teaching and
Assessment and Curriculum. All of Moray’s early
years and primary practitioners have had the
opportunity to share this learning in order that
a consistent approach is used in our ELC settings
and schools. 
The impact on our learning community has been powerful with some feedback stating “Greg is so inspiring I could
listen to him all day. It helped to remind me what ELC is all about! Amazing CPD course, thank you”. 
A teacher added,  “The best CPD event I have attended. Many simple and yet so powerful aspects shared to create
“JOY” in the classroom”. 
Greg said, “It’s been so good working with nurseries and schools in Moray and discovering their passion for play and
childhood. Early education in Scotland is on a journey and to see Moray at the forefront of this has been truly
exciting. I talk a lot about adventure with children, doing education with children and not to them, and here the
adventure is well and truly underway.” 
In regard to Learning, Teaching and Assessment, a number of key next steps were identified and have progressed
during the session.   
Priority 3 Learning, Teaching and Assessment
Action:
Next steps
identified: Progress to date:
NIF
Priority:
NIF
Driver(s):
3.1
Embed our
Moray Standard
with focus on key
areas including
tracking and
monitoring
Continue to review
and update training
materials and
resources to support
‘Our Moray Standard
for Learning and
Teaching’.  Roll out
and support the
revised Parental
Involvement and
Engagement
Strategy.
Work continues to signpost practitioners to the array
of modules, resources and online materials in
support of Our Moray Standard.  Refreshed
approaches for session 2023/2024 including refocus
as a system on ‘back to basics’ through a key text
(Power up your Pedagogy) with a range of school
approaches planned including teacher learning
communities, practitioner enquiries and wider
meeting foci.   
Education, Children’s and Leisure Services
Committee approved the Parental Involvement and
ALL ALL
Early Years’ Educator - Greg Bottrill - leads a pan-Moray
professional development session with staff practitioners,
teachers and managers

Page 92

Page 93

59 
Engagement Strategy and work has taken place with
the Steering Group in order to plan for roll out of the
Strategy and ongoing support. The Steering Group
have devised a case study template to capture work
throughout Moray and have agreed to champion this
within Associated School Groups.  
3.2
Continue to
strengthen
approaches to
assessment and
moderation
Support BGE
Moderation and
QAMSO network
activities through the
BGE Moderation
Strategy
Working with the National Improvement Framework
Officer, a rejuvenated strategy and plan for
Moderation in the Broad General Education has been
developed with sessions held.  Quality Assurance and
Moderation Support Officers (QAMSOs) were
recruited across Moray, with 65 QAMSOs
undertaking key National training in August 2022. 
Focus on target ACEL areas identified above –
Literacy (Writing) and Numeracy – formed the basis
for Associated Schools Group and individual school
level moderation activities throughout the session
facilitated by QAMSOs and central officers.  This will
lead to improved confidence and understanding of
National standards, developing leadership across
practitioners at all levels and improving rigour of
ACEL data judgments.   
Following roll-out of revised tracking and monitoring
approaches through Seemis Progress + Achievement
across our secondary schools, roll-out of Seemis
Progress + Achievement is now complete for
Primary.  Further development is now required for
data literacy and analysis for identification and
closing of attainment gaps emerging.  A Moray
QAMSO support network was formed led by two
Quality Improvement Officers in order to further
support moderation activities and share good
practice.  A moderation Sway has been developed to
support moderation for this and next session.
QAMSOs can work collaboratively to develop this
with their ASGs.  
ALL A,B,D
E,F
3.3
Support
practitioner
pedagogical
developments in
line with revised
GTCS standards
To promote and
support the use of
observation toolkits
and extend towards
Professional Learning
Communities and
Practitioner Enquiry
approaches. 
Initiate small-scale
Professional Enquiry
for wider system
participation.
Work continues with further refresh and signposting
of materials. School visit programme is informing
next steps with revised format now in place for
Secondary Improvement Model observations based
on Our Moray Standard.     
Schools continue to embrace professional
enquiry/practitioner enquiry. A recent Education
Strategic Meeting showcased example of our largest
secondary school (Elgin Academy) and how they
have embraced this across the school with teaching
staff, linked to teaching walkthrus, with learning
symposium sharing good practice and practitioner
development. 
Following Early Years Care Inspectorate visit, further
work is underway in reviewing a system based
approach to professional enquiry using recently
published professional learning materials/text. 
ALL A,C,D


Page 93

Page 94

60  
60
An increase in practitioner registrations as supported
by the Northern Alliance was noted to the World
Education Summit and a range of Professional
Learning materials and resources to support
development of practice.   
Following ADES-Education Scotland Collaborative
Improvement event and feedback, the Head of
Education has invested in ‘Power Up Your Pedagogy’
as a core back to basics learning and teaching text for
use across Moray schools to strengthen pedagogical
delivery and practice (2023/2024).
3.4
Continue to
promote use of
digital
approaches to
enhance learning
and teaching.
Continue to support
use of digital
approaches and
revisit the strategy in
line with the CGI
report findings and
work to be
undertaken in the
improvement and
modernisation
programme. 
Support the
improvement and
modernisation team
with Education
knowledge and
advice.
Our Learning Technologists continue to support the
use of digital approaches successfully.  Recent
pedagogical inputs in relation to Micro-bits were well
received and both universal and targeted digital
supported learning opportunities continue to be
offered. 
Work in relation to transformation paused.  Working
with colleagues in ICT we continue to look to creative
ways to engage learners in digital approaches, with
restrictions on network capacity and investment
prohibiting further enhancement of learning and
teaching approaches. 
A number of our schools including Dallas and New
Elgin Primary School have embraced Digital Schools. 
New Elgin Primary School has designed a bespoke
Digital Innovation space to support this further with
very positive learner engagement.  
ALL A,C,D
3.5
Develop play
pedagogy
approach – ELC
and Primary
Plan for training in
new academic
session to support
strategy. This will
include further
Primary schools
across Moray. This
will result in over half
of Primaries in Moray
engaging with
training and Play
based approach.
Further input
planned for HT
sessions in new
academic session.
Potential for
outsourced staff
training in Nov 2022
and May 2023. 
Continue to develop
play pedagogy
approaches across
ELC and Primary… 
On school visits, a Curriculum (BGE) QIO has been
moderating the quality of play and meeting with the
ELC team. QIO has been joining other QIOs for joint
school visits to support and challenge the
development play pedagogy in P1 and beyond. 
Key messages from visits are being used to consider
next steps for a child centred pedagogy. Early Years’
Service Manager will delivered input at HT meeting
in April on Realising the Ambition. 
Further work is underway in supporting NQTs with
learning and teaching and pedagogical approaches.
Following Collaborative Improvement visit, revised
approaches to learning and teaching in line with Our
Moray Standard are being developed and trialled for
whole system ownership and empowerment. 
Continuing to advocate for consistency in practice.
ALL A,C,D


Page 94

Page 95

61
Scottish Attainment Challenge 
Working in partnership with our central team and schools, the attainment
advisor (AA) has successfully engaged with over 60% of Moray schools. This
has included delivering professional learning to consider data and the local
barriers faced by pupils impacted by poverty to inform pupil equity fund
(PEF) and strategic equity fund (SEF) planning. The majority of staff have a
clear understanding of the barriers faced by pupils impacted by poverty.
Some colleagues are aware of effective strategies, approaches and
interventions to mitigate against poverty in their area. 
Fortnightly PEF drop-in sessions have been offered to explore barriers,
strategies, and interventions to enhance practitioner awareness and
understanding of poverty in their context. Local PEF and SEF guidance have
been amended to reflect the need to develop case studies and practice exemplars that showcase how schools and
partners are achieving equity. 
It was identified that satisfactory progress has been made in implementing the Scottish Attainment Challenge in
2022-23. Governance arrangements for PEF and SEF have been under review. New guidance for PEF and SEF has
been developed and shared with the system. High quality PEF plans have been developed by a minority of schools.
Moving forward, clear and consistent messages will be given to the system, working towards a standardised
approach to capturing and monitoring the impact of SAC funding. This will be supported by a framework that will
quality assure PEF plans and capture impact. This will ensure a greater emphasis is placed on the impact that this
fund is having on improving the experiences and outcomes of children and young people impacted by poverty. 
There have been significant delays in recruiting the Care Experienced Children and Young People (CECYP) Virtual
Head Teacher. This has limited impact of this funding stream. Robust plans are in place to address this. Revised
governance of this fund is being considered.   A proactive and solution focussed approach has been adopted to
mitigate the risks associated with financial management of the SAC fund. Appropriate plans are now in place to
ensure that an agile system is being developed to support Head Teachers and the central team to effectively plan,
track and monitor SAC spend. Reporting on committed PEF spend, as per the new national guidance, will be
reflected in financial plans. 
Moray Cost of the School Day 
The number of children living in relative poverty in Moray is recorded at
23%. Poverty means, stress, pressure, difficult choices and exclusion from
everyday activities for some pupils. This includes being able to access every
opportunity on offer at school.  In Moray, there was direct work in schools,
with a further eight schools working with the Child Poverty Action Group
Scotland (CPAG) on individualised projects, supporting their schools in
mitigating impact of poverty.  CPAG also worked with schools in producing
a guidance document to support tackling poverty through reducing the Cost
of the School Day for all learners.  To strengthen this work, an Education
Poverty Steering Group was put in place, which in turn linked with the Fairer
Moray Forum and the wider Moray Poverty Strategic Group.   
In Moray, insight was gathered through the voices and experiences of pupils
and families across five primary schools and three secondary schools in Moray.  During the consultation 1,562
pupils, over 200 parents and more than 100 schools staff were spoken with. The consultation explored a wide
variety of costs including uniform, school trips, access to learning resources and fun events at school.  The data,
feedback and information gathered has not only formed the final Cost of the School Day guidance produced in
February 2023 but also, the eight schools participated in local and national online events in October 2022 to share
good practice in addressing Cost of the School Day and the positive impact it has had on shaping individual school
curriculum rationales and approaches to mitigating impact of poverty.
SAC
2022/2023
Moray
PEF
£1,484,285
SEF
£170,500
CECYP
£158,025
Page 95

Page 96

62  
62
Supporting all Learners 
The Supporting All Learners Strategy was launched during
In-service in November 2022.  This was achieved
following an extensive consultation and review process
with a focus on three key areas: 
 Nurturing Authority, School and Classroom
 Workforce Development
 Health and Wellbeing systems and processes 
The reporting of the ongoing review of Additional Support
Needs to Education, Children’s and Leisure Services
Committee resulted in a request for an Elected Member
short-life working group to establish progress to date,
review priorities and plan next steps.  This coincided with
the departure of the Head of Education Resources and
Communities, with oversight of ASN being transferred to
the Head of Education (Chief Education Officer).   
This provided an opportunity for a renewed focus on Additional Support Needs moving forwards and re-establishing
a baseline position on ASN need across Moray.  Along with this, a learning visit to another local authority by the
Head of Education has enabled gathering of good practice and reflection on current status.  As a result, the following
priority areas will be progressed next session: 
 Re-establish a shared vision for future ASN provision across Moray
 Working with Education Scotland, there will be a renewed focus on Inclusive Practice and approaches to
supporting all learners
 Undertake an in-establishment moderation exercise to review current resource allocation and funding
needs
 To implement a strategic commissioning framework in order to gather intelligence on local providers and
services to support educational delivery
 To relaunch the Moray Staged Intervention model and responsibilities at every stage including training offer
for staff
 To undertake a review of key policies and guidance in meeting current legislative requirements
 To realise our vision for the future through mapping of service resources and staffing requirements 
Underpinned by the United Nations Convention on the Rights of the Child (UNCRC), The Morgan Review (ASN
Review), and The Promise it is acknowledged that work in this area will be transformational to the Moray Council
and is dependent on additional resource to move this forwards at pace.  We further continue to empower our
system to consider children’s rights across all aspects of educational delivery through the UNICEF Rights Respecting
School Award (RRSA). 
Wellbeing continues to be a focus of our schools, with return to pre-established systems and processes to ensure
the needs of all children and young people are met.  Using Pupil Equity Funding (PEF) a number of interventions to
support pupils have continued over the course of the session including Breakfast Clubs, alternative/flexible
timetables, Nurture Groups, targeted Intervention Groups (including focused Literacy/Numeracy recovery
sessions), wellbeing interventions and family supports. 
In Senior Phase, SQA Coordinators continue to report an increase in the level of Additional Assessment
Arrangements (AAA) to support pupils with anxiety and other identified learning needs.  Schools continued to offer
children, young people and their families where required enhanced support in absence of wider services, adding
pressure on schools wider than delivery of high quality learning, teaching and assessment.   
Page 96

Page 97

63
Counselling services continue to be well used, further extended with Action for Children’s ‘Sonas’ service for
counselling and mental health support for children and young people living in Moray.  This is in addition to the valued
service provided by ‘The Exchange’.  As a result, more children and their families are continuing to be supported.  In
regard to Supporting all Learners, a number of key next steps were identified and have progressed during the session.   
Priority 4 Supporting all Learners
Action: Next steps identified: Progress to date: NIF
Priority:
NIF
Driver(s):
4.1
Develop
Supporting All
Learners
Strategy for
Moray –
contribute to
and support
ASN Review
Roll-out and implementation of the
SAL Strategy with development of
rubric to support the 6-year plan. 
Continue to support the ASN review
within key workstream areas with
one officer from Education linked to
each workstream and operational
groups.
Training information and support
materials have been developed for all
schools.  These have been shared with
the initial core group to ensure that all
aspects are covered and meet the
needs of the identification of training
needs completed by schools. 
The nurture rubric did not progress as
anticipated, with further work on this
continuing to be undertaken along
with universal and targeted support
offers for schools aligned to ongoing
work and developments related to the
ASN review.   
1,2,3 A,B,E
4.2
Strengthen
Curricular HWB
offer across
Moray
Strengthen Curricular HWB offer
across Moray. 
Limited progress has been made due
to the number of Support and
Challenge school visits undertaken and
required as part core Quality
Improvement role.  This action will be
on-going and continue into the
2023/2024 service plan.
1,2 A,B,D
4.3
Empower our
system to
consider
children’s rights
across all
aspects of
educational
delivery
Further training will be offered next
session through Education Scotland
provider and in support of the
delivery of The Promise.   
Develop a cohesive single/multi-
agency plan for full implementation
of the UNCRC and the Promise in
Education.
An education officer is now part of the
Promise Keepers working group, taking
forward The Promise actions identified
in the Children’s Service Plan.  
The Children’s Services Plan is now
complete and incorporates a multi-
agency approach to the UNCRC and
‘The Promise’. Education
representatives attend a variety of
groups which take forward aspects of
the plan including the Health and
Wellbeing Partnership; Corporate
Parenting Group; Education and
Employability Group; Child Poverty
Group; Rights and Participation Group;
Young Carers Group; Child Poverty
Group; Child’s Planning Group; GIRFEC
Leaders Group and Child Protection
Committee; Data and Evidence Group
and the Learning and Development
Group.
1,2,3 ALL
4.4
Ensure
Education fulfil
requirements
of the Promise
Develop a cohesive single/multi-
agency plan for full implementation
of the UNCRC and the Promise in
Education.
ALL ALL




Page 97

Page 98

64  
64
The Children’s Services Plan and core
themes relating to the UNCRC and ‘The
Promise’ will permeate our Strategic
Priorities 2023/24. This is the subject
of ongoing review and discussion and
will take account of other relevant
data sources including the recent
Collaborative Improvement event
attended by ADES and Education
Scotland; review of school visits; HMiE
feedback and Attainment data, the
focus for the next Strategic Plan 2023-
24. 
“Promise Keepers” have been
appointed within the service who will
be a key link to The Promise
Team/Corporate Parenting Group. 
The Education and Employability
Group had been provided with data by
QIM (Performance) around attainment
for Care Experienced and Looked After
Young People. The group will use this
data set to inform future interventions
to support children and young people. 
4.5
Review of
policy and
practice in
support of all
learners
Review alternative and part-time 
timetable provision across Moray to
maximise school attendance,
participation, attainment and
partner involvement. 
Due to the commitment to support
schools during Covid and support
the new governance structure for
the ASN review, a group, dedicated
to reviewing policy has been
created and they will take forward
aspects of this work
Data analysis of flexi-timetables has
led to a review of the attendance
policy by the secondary DHTs of
Pastoral.  Further consultations will be
taken into consideration along with
embedding the UNCRC and The
Promise. This also aligns with the work
completed by the Child’s Planning
Thematic group regarding the Child’s
Planning process following the
extensive audit undertaken during
quarter 1 and 2 with professionals,
parents and pupils. A new format has
been drafted by the group and shared
with the Head of Education and DHTs
(Pastoral) for initial feedback. Further
consultations are to be undertaken,
supporting guidance to be written.
Solution Oriented training will be
delivered across Education, Health and
Social Work to support the
implementation of the new Child’s
Planning Process, and to coherently
align with the new Child Protection
Child’s Planning Process.  
1,2,3 ALL  

Page 98

Page 99

65   Page 99

Page 100

66  
66  
Page 100

Page 101

67   Page 101

Page 102

68  
68  
Page 102

Page 103

69
Leadership 
There is a continued commitment and desire to improve leadership capacity across the Moray system through
empowerment and professional development opportunities.  The Professional Learning and Leadership Strategy
underwent a timely review with a range of practitioner toolkits updated.   
Elgin Academy embraced a Practitioner Enquiry
approach to professional development which was
showcased at an Education Strategic Meeting. 
Colleagues who have successfully completed a range of
leadership programmes showcased their learning
through a range of virtual meeting opportunities,
sharing their approach with the wider Moray Education
system.  All colleagues continue to benefit from the
opportunity to reflect on their professional
development through Professional Review and
Development Meetings (PR&D) and the Employee
Review and Development Programme (ERDP). 
Other successes noted from 2021/2022 include seven senior leaders successfully achieving the Standard for
Headship through Into Headship (formal certification/graduation during session 2022/2023).  Other successes
include over 70 Newly Qualified Teachers completing their first year of teaching in Moray last year where a teacher
at Speyside High School – Carrie McWilliam – was jointly awarded the Saroj Lal Award for a Pioneering Spirit in
Equality and Diversity by GTCS.  The award is in honour of Saroj Lal, a trailblazer working at the forefront of
multicultural and anti-racist education in its early years and laying the foundations for others to bulid on early work
(GTCS, www.gtcs.org.uk, 2022).  Practitioners and school leaders embraced the opportunity to undertake additional
programmes.  For example, Into Headship, In Headship, Excellence in Headship and our Moray Leadership and
Management Programme.  In summary as noted in the key successes pages further above, colleagues participated
in the following Education Scotland Programmes: 
Teacher
Leadership
(2)
In
Headship
(1)
Excellence
in
Headship
(7)
Into
Headship
(4)
Aspiring to
Middle
Leadership
(13)
Middle
Leaders
Leading
Change
(7)
Building
Racial
Literacy
(3)
55 colleagues were
also promoted within
Moray Education from
September 2022 to
June 2023 across
schools and post levels
Page 103

Page 104

70

There has been a sustained focus on professional learning which has been delivered to practitioners across the
system. A well-planned strategic and structured approach to career long professional learning is in place. This
aims to build capacity and enhance practice and outcomes for all learners. This has been informed by strategic
need as well as shaped by feedback from staff. The ‘Professional Learning and Leadership Strategy’ has gained
approval and 12 toolkits support this strategy.   
A range of mediums are being used to facilitate professional learning, which includes: networks, team meetings,
sways and wakelet resources. This is allowing staff from across the system to self-direct learning, access learning,
and via platforms, which are conducive to their learning style.  A comprehensive Head Teacher guide has been
developed by the Head of Education based on Consultative Group feedback in order to support school leadership
and management as well as providing a ready reference reckoner for managing key aspects of a senior leader’s
role.  The GTCS also provided reaccreditation of the Moray Education Leadership Programme following
engagement with the link Quality Improvement Officer. 
Following completion of recruitment and selection processes, Moray now has six Education Scotland Associate
Assessors among our Head Teacher colleagues, strengthening our ‘looking outwards’ for inwards improvement. 
At a recent Education Strategic Meeting in June, three of our Associate Assessors presented on their approaches
to using ‘Power Up Your Pedagogy’ as we look to the new session and revised approaches to pedagogical refresh
and curriculum delivery.   
In regard to Leadership, a number of key next steps were identified and have progressed during the session.   
Priority 5 Leadership
Action:
Next steps identified: Progress to date: NIF
Priority:
NIF
Driver(s): 
5.1
Develop
professional
learning strategy
with full
consultation
Complete and roll-out the
reviewed PLL Strategy.
The PLL Working Group were to
refresh and work on a plan to roll
out the PLL Strategy from
February 2023 onwards.  This has
been sent out to schools via the
Education Briefing in May 2023.
2,3,4,5 A,B,E 
5.2
Promote and
support
implementation of
new GTCS
professional
standards and CI
standards
Develop and support the use of
observation toolkits and extend
towards professional learning
communities and practitioner
enquiry approaches.
The 12 toolkits have been added
to the Moray Education PLL
Sharepoint site and are being
updated and added to on an
ongoing basis. Updates will add
to the Moray Education PLL
Padlet which is now in use.  
2,3,4,5 A,B,E
5.3
Continue to review
the framework for
professional
development/career
pathways
Review and further develop all
Moray professional learning
programmes (NQT, middle
leadership, aspiring and senior
leadership. 
Complete and initiate newly
appointed senior leader induction
programme and resources. 
This is ongoing at present with
the PLL Working Group.  Progress
has been delayed due to wider
commitments with schools and
emerging priorities.  SLT
Induction Programme allied to
the Moray Education
Management Programme
developed.  
ALL A,B,E


Page 104

Page 105

71
Support and extend external
professional development
programmes and partnerships. 
Initiate small scale professional
enquiry for wider system
participation and QIM to
undertake Professional Enquiry
and share findings. 
QIM to attend UHI first line
managers’ programme and share
learning.
The link officer has been unable
to progress some areas due to
wider officer absence and school
needs.  Attendance at meetings
has been supported.
5.4
Review OECD and
other national
reviews for
emerging themes in
support of
practitioners
Support empowerment and
system leadership through
guidance, signposting and
facilitation. 
Engage with the national
conversations around Education
reform and review and participate
in the Hayward review. 
Continue to share key messages
across the service.
This is ongoing and relevant
information is sent to Moray
Education colleagues when it is
received through Bulletins, HT
Briefings and the termly PLL
Update. Responsible QIO works
with various partner agencies to
support Moray Education
Professional Learning and
Leadership activities such as UHI,
GTCS, UoA, EDSPLL, The Coaching
Collaborative etc.  
ALL ALL

Education Service Self-evaluation | ADES-Education Scotland Collaborative Improvement
Page 105

Page 106

72
Self-evaluation for self-improvement 
Session 2022-2023 provided the opportunity for the service to review priorities in order to support improvement. 
A range of engagement sessions over the early part of the session with senior leaders initially highlighted the need
to undertake a full-scale review of existing priorities with a view to refining and refocusing on post-pandemic actions
which will have the greatest impact on Moray’s learners.  A planned Curriculum Innovation session in October 2022
supported this approach and in particular, a need to establish a vision for curriculum in Moray 2030 in light of
current national review and reform.  Broad representation across key partners including Skills Development
Scotland, Moray College UHI and DYW Moray, as well as support from Education Scotland’s Curriculum Innovation
Team using a range of improvement methodologies and approaches evidenced the need for wider Curriculum
reform. 
The planned ADES-Education Scotland Collaborative Improvement event in February 2023 was opportune timing
for progressing discussions and action planning required as well as being a vehicle for gathering wider self-
evaluation for our service improvement.  Using findings from key themes explores at the Collaborative
Improvement event and system leaders from across our Educations system offering views through collaborative
discussion groups, key priorities and actions were established.   
Terms of reference for the Moray Curriculum Strategy Group and Moray Improvement Groups have now been
formulated with system wide support being requested. 10 improvement groups aligned to the curriculum have
been identified and will be taken forward in the coming session to improve learning, teaching, and assessment to
meet the needs of all learners. Improvement groups will be governed by the overarching Curriculum Strategy Group. 
We continue to participate in key national reform on the curriculum underway through review based activities,
with a view to maximising achievement of all learners, in graded and ungraded qualifications and curriculum
experiences as we look to the future.   In summary, feedback from the Collaborative Improvement session has
evidenced the need for a co-created, holistic plan supported by empowered leadership with relentless focus on: 
o Improved learning, teaching, and assessment to meet the needs of all learners
o Improved curriculum to meet the needs of all learners
o As part of this, the outstanding additional support needs review will be concluded 
The education central team hold membership on a broad range of groups, including the Corporate Parenting
strategic group and the Education and Employability pillar group. This ensures that there is collaboration across the
community planning partnership to explore equity and excellence. Regular meetings take place with the early years’
central team to plan events and networking opportunities, and develop resources. This collaboration ensures
consistency across the system and contribution to system-wide self-evaluation. 
There are risk implications as to how our attainment datasets continue to be used as comparator data for the next
3-5 years which may skew future performance reporting and stretch aims setting.  The data presented herein for
2021/2022 reflects year 1 of reversion to an examination based system, differing to the previous two session’s ACM
and the examination process in place during session 2018/2019. Schools continue to report concerns regarding
behaviours, wellbeing, mental health and impact on learner outcomes and attainment.  This has resulted in
increased behaviours of concern in schools, with pressure on partnership capacity impacting on wider supports
available to schools.  As a result, existing resources require to be directed to support young people individually and
in small groups by schools, impacting on wider school agenda of improving outcomes for individual pupils, groups
and cohorts.     
Schools further note increases in Additional Support Needs among pupils, impacting on number of courses studied
and levels of study.  This has measurable impact on attainment measures outlined above on individual schools and
is anticipated to increase based on Broad General Education cohort information.  A number of young people, due
to their additional support needs, access a personalised curriculum with individual targets and outcomes.  Where
a number of other local authorities have dedicated establishments for supporting young people with specific
SEBN/ASN, this is not reflected fully in comparators presented due to different operating contexts and limited
external resource offer.  Our ASN review will continue to inform improvements and guide us in future direction as
we look to Moray 2030 and how best to support all learners as a united Education service. 
Page 106

Page 107

73 
Priority 6 Self-evaluation for Self-improvement
Action:
Next steps
identified: Progress to date: NIF
Priority:
NIF
Driver(s):
6.1 
Reflecting on the
impact of the
pandemic, review
approaches to
supporting the
wellbeing of all
Continue to work
with HR and across
the service to
ensure the
wellbeing of all is
catered for
Through strategy areas noted above including
Supporting All Learners, nurture based
approaches, staff professional learning, leadership
and development opportunities this continues to
be a key area of focus under progress.
2 A,B
6.2
Review and
consolidate
implementation of
1140 hours including
quality of experience
Engage with the
report from the EY
review consultancy
report and
implement
findings.
Findings have been reviewed and acted upon
appropriately to ensure best value and most
effective service delivery to meet the needs of
children and families.  A number of aspects
remain in progress with confidentiality due to
nature of findings.
1,2,3 A,B,E
6.3
Continue to review
approaches to self-
evaluation in line
with statutory
requirements and
emerging good
practice
Increase and
improve system
wide accountability
and responsibility
for improvement
across the
Education Service 
Review approaches
to self-evaluation
for self-
improvement
across our system
including updating
guidance in line
with statutory
scrutiny and
requirements
School Improvement Model (SIM) visits have
continued with all complete other than one school
visit which has been postponed due to
engagement with Education Scotland and a
thematic inspection.  Primary school visits have
taken place with targeted schools in relation to
readiness for inspection focusing on themes
within Quality Indictor 2.3 (Learning, Teaching and
Assessment), 3.2 (Raising attainment and
achievement) and 1.3 (Leadership of Change).
Verbal and written feedback from visits has been
provided to school leadership teams in order to
support self-evaluation and identifying next steps.
Central QIO/QIM team continue to engage in a
programme of moderation to ensure consistency
across school visit processes and reporting.
Statutory documentation reviewed against core
Quality Indicators continues to be scrutinised by
central team for moderation and feedback.
Further data analysis process will inform School
Improvement Planning and central support and
challenge moving forward. 
ALL ALL 
Engagement throughout the session on a range of issues and themes has continued with the Head Teacher
Consultative group.  This has included consultation on school review processes, Additional Support Needs, budget
and financial pressures along with wider proposals including Inset day use and allocation of resources.  A revised
education governance structure based on feedback from the consultative group is in draft form in order to provide
clarity in service strategy and school visit programme and approaches to leadership. Using Education Scotland’s
revised framework for recovery and accelerating progress, streamlined Stretch Aims on key measures set with wider
system consultation undertaken are outlined in the separate Moray Education NIF Key Priorities and Plan 2023-
2024 (incorporating revised Stretch Aims reflective of revised Scottish Government/Education Scotland
Framework for Recovery and Accelerating Progress).



Page 107

Page 108

74

Covid-19 Recovery 
Common with schools across Scotland, Moray schools closed due to National Covid-19 lockdown in March 2020
with significant disruption to learning.  On first lockdown, our schools established new ways of working online
through use of digital platforms and issue of paper-based learning resource packs and initiation of wellbeing
supports and interventions including online support and in-person (socially distanced) wellbeing walks in a number
of cases.   Guided by central Education Head of Service and Education Managers, our schools have supported all
requests from the Scottish Government and Moray Council in response to the Covid-19 pandemic to date, initiating
wellbeing and learning interventions in support of all children and families.  This ensured as far as possible within
Covid-19 restrictions in place that no learner was disadvantaged through provision of digital devices, paper-based
resources, wellbeing supports, universal and targeted intervention including during the second national lockdown
from January to March 2021.  Following return in August 2021 Moray schools have continued to work with children
and families and ensured School Improvement Plan priorities continued to progress at pace.  As such, we continue
to comply fully with Scottish Government advice and guidance on Coronavirus ensuring use of all resources
including Scottish Attainment Challenge and Devolved School Management resource are deployed where necessary
in support of all learners. 
Emerging impact of the Covid-19 pandemic is now being realised as a result of challenging behaviours exhibited by
some young people and need for increased parental involvement and engagement in supporting schools to
reinforce importance of positive relationships and raising ambition in young people.  This includes wider aspects
including developmental delay and wider learning needs as children transition to early years and school settings
following periods of lockdown in earlier developmental stages.  At secondary school, this is noted in breadth and
depth measures and aspiration of young people to achieve as fully as they can, with increased levels of anxiety
noted resulting in lower ambition in courses/course levels studied in Senior Phase.   
All of the above are likely to have an effect on SQA results and overall performance data in future years.  Changes
in assessing qualifications in 2020 and 2021 as a result of cancellation of examinations as well as return to
examinations this session creates risks relating to accountability and data comparability.  Further potential changes
are planned to our main awarding body, SQA, as it is redeveloped along with assessment approaches in the future,
altering comparator datasets further.  As a service, we will continue to embrace challenges and changes and seek
new opportunities, working with others in order to support all learners and their achievements. 
Priority 7 Covid-19 Recovery
Action: Next steps identified: Progress to date: NIF
Priority:
NIF
Driver(s):
7.1
To reduce the
impact of Covid-
19 on school
communities
The roll out of the SAL strategy will
support the wellbeing of our
learners and nurturing approaches
will be rolled out across the service.   
Use of SEF funding for projects in
Elgin and Buckie will strengthen
approaches to supporting targeted
interventions for children and young
people who need identified support. 
Planned use of CEYPF will ensure
capacity to support vulnerable
groups with planned recruitment for
virtual head teacher to oversee this.
Please see Supporting All Learners and
Scottish Attainment Challenge sections
above as well as case studies.  Schools
continue to use all funding available to
target supports where required for
learning and wellbeing.  Addition of
Strategic Equity Funding for projects in
Elgin High School (Equity) and Buckie
ASG (Transitions) has been welcomed
due to school and ASG profiles and
need.  Schools have reduced PEF
underspend notably.  ASN review now
moves forward with reviewed initial
priorities with change in leadership of
this area of the service moving
forwards, now under direction of the
ALL ALL
Page 108

Page 109

75


Targeted PEF interventions will
support those children and young
people who were most affected by
the pandemic to ensure gaps in
learning are supported. 
Continue to support the ASN review
and workstreams.
Head of Education (Chief Education
Officer) from late May 2023.
7.2
To ensure that
there is
compliance with
expectation and
legislation 
Continued compliance in line with
Scottish Government requirements.
The service continue to comply with all
statutory legislation and Scottish
Government requests including
statutory returns and representation.
ALL ALL
7.3
To ensure
continuity in
learning with
Covid outbreaks
(positive cases)
Continue to support any outbreaks
and monitor impact on absence
levels of staff, workload of senior
managers and delivery of service. 
Continue to work with the Council
HR team to review the offer to
support staff’s wellbeing.
We continue to review national
guidance and remain aware of
Coronavirus strands as they may
emerge, as highlighted in national
press.  The service pre-planned as
contingency with recovery plans
remaining from previous experience of
service disruption.   
Staff wellbeing supports continue with
ongoing engagement with HR and
Organisational Development team as
appropriate, with Head of Service
overview.  Council supports including
Time for Talking and Occupational
Health referral remain available as well
as officer support for Head Teachers. 
Ongoing positive industrial relations
with Trade Unions to remain fully
aware of any staff concerns and
emerging needs.  Officers adhere to
Health at Work policy for absence
management and staff support.
ALL ALL 
Page 109

Page 110

76
African Proverb
“It takes a village to raise a child”
NIF | Summary Actions | 2023/2024 
Aligned to the key priorities contained within the National Improvement Framework and Plan 2023, please now
refer to the separate Moray Education NIF Key Priorities and Plan 2023-2024 (incorporating revised Stretch Aims
reflective of revised Scottish Government/Education Scotland Framework for Recovery and Accelerating
Progress).   
Following review as a service, this document contains Stretch Aims set based on data intelligence and revised
Service Priorities and Actions founded on considerable service self-evaluation over the course of last session. 
Following restructuring of the Education component of the Education, Communities and Organisational
Development division of Moray Council following departure of the Head of Education Resources and Communities,
a one year plan with focus outlined in the diagram below focusses our direction in 2023/2024: 
Curriculum
Learning,
Teaching and
Assessment
Reviewing
Additional
Support Needs
Strengthening
leadership and
empowerment
Moray Education
Strategic Priorities | 2023-2024
…in order to meet the needs of all learners in Moray
Together we are Moray Education and we will focus on…
Moray Council | Fair | Ambitious | Improving | Responsive
Page 110

Page 111

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 19 SEPTEMBER 2023 
SUBJECT: IMPROVEMENT AND MODERNISATION PROGRAMME: RAISING
ATTAINMENT CURRICULUM BREADTH AND DIGITAL
INFRASTRUCTURE PROGRESS UP-DATE 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To up-date Committee on progress in development of the Raising Attainment:
Curriculum Breadth and Digital workstream within the Council’s Improvement
and Modernisation Programme and to seek agreement for the development of
the Education networks digital infrastructure. 
1.2 This report is submitted to Committee in terms of Section III (D) 1 of the
Council's Scheme of Administration relating to exercising all the functions of
the Council as an Education Authority. 
2. RECOMMENDATION 
2.1 It is recommended that Committee: 
(i) consider and note the contents of the Digital Inclusion
(Infrastructure) Business Case (Appendix 1); 
(ii) agrees to the preferred Business Case option of addressing
connectivity issues and supporting iPads which was informed
through conducting a staff engagement workshop; 
(iii) agrees that the 12 month extension of the Senior ICT Officer post
at a cost of £56,000 to be sourced from Transformation Reserves; 
(iv) agrees that the external professional services to support
implementation and training at an estimated cost of £10,000 to
£15,000 would be sourced from the remaining £35,849 of the
£50,000 agreed by the Education, Children’s and Leisure Services
Committee on 26 January 2022, previously allocated from the
Transformation Reserves; 
Item 9.*
Page 111

Page 112

(v) agrees that the ongoing annual Mobile Device Management
System (MDM) licence fee per device (current cost estimated at
£8,000 to £9,000) would be funded from the Devolved School
Management (DSM) Budget; and 
(vi) notes that further reports will be presented to committee up-
dating on progress and impact of the proposed solution to
support the Curriculum Breadth and Digital Workstream. 
3. BACKGROUND 
3.1 The Council has established an Improvement and Modernisation Programme
(IMP) to deliver transformational change across the authority, which was first
approved by the Council on 12 December 2018 (para 5 of the minute refers). 
3.2 One of the workstreams within this Programme is Raising Attainment:
Curriculum Breadth and Digital. This workstream aims to provide and enable a
digital learning environment to improve equity and access to the curriculum in
order to deliver a range of outcomes. 
3.3 At the Education, Children’s and Leisure Services Committee on 14
December 2022 an Outline Business Case was presented for consideration in
relation to digital learning, including the provision of 1:1 devices. 
3.4 The Outline Business Case (OBC) presented a staged approach to
investment in digital learning. The stages presented were 
3.5 Stage 1: This stage is focused on preparing and developing the ICT
infrastructure to ensure readiness for digital development and of the
Education Digital strategy and approach. This would include ensuring that the
school digital environment is ready for the increased use of devices and
curriculum tools. 
3.6 Stage 2: Prepare the workforce ensuring that they have the leadership, skills
and digital confidence they need and that a culture is created to support
enhanced use of digital in schools by preparing pupils and parents and
ensuring support is available for the new approach. 
3.7 Stage 3: The roll out of devices to staff and pupils at a scale and over a time
period that is affordable and takes account of any external investment, in
particular from the Scottish Government. This is likely to be over a number of
years, for example Scottish Borders invested over a 7 year period. 
3.8 This staged approach had been informed by a report commissioned from CGI
Consultancy in order to provide a way forward to progress the development of
digital education that would represent a more affordable approach given the
council’s financial position. 
3.9 Based on a staff engagement workshop hosted by Martyn Wallace, Chief
Digital Officer, Scottish Local Government on 19 April 2023, a Business Case
Page 112

Page 113

has been developed to progress the recommendations made by this
Committee on 14 December 2022 (See Appendix 1). 
3.10 The Business Case aims to help address the ICT infrastructure connectivity
issues affecting many Early Learning and Childcare (ELC) settings, Primary
and Secondary Schools in Moray. It also intends to ensure that the Council is
in a position of readiness for any possible future investment in digital devices. 
3.11 To date, the ICT service has made a number of improvements to the ICT
infrastructure for ELC Settings, Primary and Secondary Schools. This includes
the removal of legacy devices with Windows 7 operating system which were
not able to be upgraded and adjusting the log-on profiles. While these actions
have had some positive impact there continues to be scope for further
improvement. 
3.12 The aim of the Business Case is therefore to identify further actions that could
be taken by the Council to provide further improvement in the performance of
the schools ICT network to ensure that digital solutions are easy to use to
their maximum effect. 
3.13 The approach for identifying these improvement actions was the workshop
held with Council ICT, Primary and Secondary Head Teachers and Learning
Estate colleagues. The workshop explored a range of potential investment
options that were assessed against the selection criteria of ‘Improving
Connectivity’, ‘Supporting Learning Outcomes’ and ‘Affordability’. 
3.14 Following the application of the selection criteria, the preferred option was to
“Address connectivity issues and support iPads” 
3.15 The rationale for this decision is that there has been a significant growth in the
use of iPads from 28 devices in 2014 to 1524 devices in 2023 across Moray
Schools and this has undermined overall network performance.  The devices
are used by both staff and pupils in schools to support learning. 
3.16 Although the procurement of these devices is not the preferred approach of
the Council’s ICT service because it requires 2 separate operating systems to
be supported, which is more resource intensive, under Devolved School
Management arrangements, schools are able to purchase and utilise iPads if
they choose to. The number of iPads deployed and the feedback from the
workshop are both strong indications of the preference of schools and so it is
reasonable to plan for their continued use. 
3.17 The unintended consequence of the increased use of iPads across Moray
Schools is the detrimental impact iPads have on the overall performance of
the Education ICT network as a result of the way in which they download up-
dates and thereby utilise the education network bandwidth. This is a major
factor contributing to slow logon times experienced by many ELC settings and
Schools. 
3.18 The solution as outlined in this Business Case is the procurement of a MDM
that is designed to support Apple products such as iPads and manage their
bandwidth requirements. A dedicated MDM for iPads will improve the overall
Page 113

Page 114

performance of the ICT education network by ensuring that the bandwidth
available is efficiently used. 
3.19 The Business Case notes that there are a range of different MDM options that
would result in improved network performance. However the identification of
the optimum option for this Council would need to be based on the outcome of
a procurement exercise. 
3.20 The indicative cost for this preferred Business Case option is £50,000-
£65,000. Thereafter, there would be an annually recurring cost estimated at
£8,600 to support 1500 iPads. This cost would depend on the outcome of the
procurement exercise. 
3.21 If the preferred option identified in this Business Case is endorsed, then a
detailed Implementation Plan would be developed. The execution of the plan
would be undertaken by senior officers within ICT, supported by the temporary
ICT technician post and overseen by the Head of HR, ICT and Organisational
Development. 
3.22 It should be noted that workshop participants were clear that any future
investment programme leading to the increased procurement of 1:1 devices
by the Council would need to be based on an extensive engagement exercise
with both learners and teachers. However, the increased up-take of iPads
over the last 10 years requires an immediate solution due to the impact that
the extensive use of Apple products is having on the overall performance of
the Council’s ICT Infrastructure Network. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The Improvement and Modernisation Programme is the development of
the commitment in the Corporate Plan to a programme of modernisation
and improvement to contribute to a financially stable Council. 
The report also relates to “Building a better future for our children and
young people in Moray” as part of the LOIP and the priority “to provide a
sustainable education service aiming for excellence” as part of the
Corporate Plan. 
(b) Policy and Legal
Policy and procedures would be reviewed if the Council is to increase its
ICT support for Apple devices. 
(c) Financial implications
The following table provides a breakdown of the costs for this project. 
Item Estimated
Value
1. Senior ICT Officer support (temporary) 
Salary costs for a 12 month post at grade 9. 
£56,000
Page 114

Page 115

2. Professional services for implementation
and training 
£10,000-
£15,000
3. MDM to support iPads through appropriate
MDM solution option. Cost per annum
based on the number of devices 
£8,000-
£9,000      
Total £74,000-
£80,000 
In relation to row 1, the source of funding for the Senior ICT Officer post
would be from Transformation Reserves.   
In relation to row 2, the source of funding for professional services for
implementation and training would be sourced from the remaining
£35,849 of the £50,000 agreed by the Education, Children’s and Leisure
Services Committee on 26 January 2022, allocated for consultancy
engagement. This was also previously allocated from Transformation
Reserves. 
In relation to row 3, the annual MDM cost (based on a licence fee per
device) would be funded from the Devolved School Management (DSM)
Budget.  While recognising the council’s financial position, this is
considered to be a pressing operational requirement to support the
delivery of modern educational tools in our schools and no additional
recurring budget is requested.   
(d) Risk Implications
The Business Case outlines a range of high level project risks. These
risks include that enhanced infrastructure support for iPads could result
in an increased up-take of these devices across Moray Schools 
Additional ipads may also come from the strategic view on future
devices.  Annual costs could therefore escalate above the current
estimated cost of £8,000-£9,000 to support 1500 devices and schools
would have to accommodate this additional cost. 
There is also a risk that if DSM budgets were to come under pressure for
budget savings that it would not be possible to meet the costs of the
mobile device management licences from these budgets. 
(e) Staffing Implications
The Business Case includes the salary cost of extending the contract of
an existing ICT technician at grade 9 for a further 12 months. The related
cost for this post would be £56,000. 
(f) Property
There are inter-dependencies between this project and the
modernisation of the Council’s Learning Estate. Officers will ensure good
communication between these initiatives and the Learning Estates
Manager will also sit on the Project Management Group.
.
Page 115

Page 116

(g) Equalities/Socio Economic Impact
For the purposes of this report an Equality and a Socio Impact
Assessment is not required. 
(h) Climate Change and Biodiversity Impacts
There are no immediate climate change implications directly arising from
this report. The future commissioning and de-commissioning of digital
devices will however have an impact on the Council’s carbon footprint
and this will need to be assessed in due course. 
(i) Consultations
The Head of Education (Chief Education Officer), Head of Finance,
Procurement Manager, Quality Improvement Manager (East), Head of
Economic Growth and Development,  Learning Estates Manager, Quality
Improvement Manager (West), Head of HR, ICT and Organisational
Development, ICT Infrastructure Manager, ICT Information Systems
Manager, Learning Technologists, Democratic Services Manager. 
In addition, colleagues who also participated in the workshop have also
been asked to comment on the Business Case. 
5. CONCLUSION 
5.1 An investment in a MDM to support Apple products aims to improve the
ICT Education network performance for ELC settings, Primary and
Secondary Schools. It also aims to provide a strong foundation for any
future investment in digital learning in Moray. 
Author of Report: Robin Paterson, Project Manager (Education) 
and Graham Cooper ICT Infrastructure Manager 
Background Papers: 
Ref: 
Page 116

Page 117

APPENDIX 1
Business Case   
Version Number: Fifth Draft Created: 28/08/2023 17:49 Saved: 11/09/2023 13:51
c:\program files (x86)\neevia.com\docconverterpro\temp\nvdc\adc60c13-97c2-4b90-807e-04148f10d282\506bd6da-a087-44c0-8339-
fc8d4a4f30fa.docx Page 1 of 41
Name of Document: The Digital Inclusion (Infrastructure)  Business
Case
Author: Robin Paterson, Project Manager (Education)
and Graham Cooper, ICT Infrastructure
Manager
Description of Content: Business Case to determine the investment
option to further support improvements to the
ICT infrastructure and in readiness for any
potential future investment in 1:1 devices
Status: Fifth Draft 
Approved by: 
Date of Approval: 
Item 9.*
Page 117

Page 118

Intermediate Project Business Case
Page 2 of 41 
Contents
Version History ................................................................................................. 2
Executive Summary                                                                                          3 
1.0 Introduction ................................................................................................ 5
2.0 Background                                                                                                 5
3.0 Purpose                                                                                                       7
4.0 The Benefits                                                                                                8
5.0 The Strategic Case: Infrastructure Support for Digital Learning                 8
5.1 Hardware                                                                                                     9
5.2 Mobile Device Management (MDM)                                                            9
5.3 Bandwidth                                                                                                 11
5.4 Conclusion                                                                                                12
6.0 The Economic Case                                                                                  12
6.1 Conclusion                                                                                                12
7.0 The Financial Case                                                                                   14
7.1 Conclusion                                                                                                15
8.0 Critical Success Factors                                                                            15
9.0 The Backcasting Workshop                                                                      15
9.1 The Backcasting Workshop Objectives                                                     15
9.2 Scenarios Generated                                                                                15
9.3 A Logic Modelling Approach                                                                     16
9.4 Scenario Summary                                                                                    19
9.5 Options and Appraisal                                                                               20
9.6 The Preferred Option                                                                                24
9.7 Cost Profile                                                                                                24
10.0 Main Risks                                                                                               25
11.0 Constraints and Dependencies                                                               26
12.0 The Management Case                                                                           27
12.1 Project Reporting Structure                                                                     27
12.2 The Implementation Plan                                                                        27
12.3 Arrangements for Risks and Issues Management                                  28
12.4 Arrangements for Benefits Realisation                                                   28  
Appendix 1: Glossary of Terms
Appendix 2: Learning Estate Profile
Appendix 3: Digital Backcasting Workshop Participants
Appendix 4: Backcasting Scenarios 
Version History
Version Date Details
0.1 14 5 23 Initial draft created by Robin Paterson 
0.2 08 6 23 First draft with comments for discussion added
0.3 07 7 23 Second draft with initial colleague comments incorp    
0.4  20 7 23 Third draft with up-date from G. Cooper
0.5 28 8 23 Up-date following the Transform Leadership Board
and consultation feedback
Page 118

Page 119

Intermediate Project Business Case
Page 3 of 41 
Executive Summary 
This Business Case aims to help address the ICT infrastructure connectivity
issues that have affected some ELC settings, Primary and Secondary Schools
in Moray. 
To date, the issues that have impacted on network performance include
roaming profiles which download at each login and then uploaded at log out,
the continued use of old devices -in particular windows 7- and broadband
connections for some schools, primarily in rural areas. 
The increased use of iPads, has grown from 28 devices in 2014 to 1524
devices in 2023 across Moray Schools has also undermined network
performance. 
In addressing these issues, ICT colleagues have made many improvements
to the Learning Estates ICT Infrastructure. This includes the replacement
programme for Windows 7 operating system based devices. 
These actions have had a positive impact on improving logon times. 
Consequently, the premise of the Business Case is to provide additionality in
terms of offering further improvement actions that could be undertaken by this
Authority. The Business Case also intends to ensure that the Council is in a
position of readiness for any possible future investment in digital devices. 
The basis of identifying these improvement actions was a workshop held with
Council ICT, Primary and Secondary Head Teachers and Learning Estate
colleagues. The workshop explored a range of potential investment options
that were assessed against the selection criteria of ‘Improving Connectivity’,
‘Supporting Learning Outcomes’ and ‘Affordability’. 
Following the application of the selection criteria, the preferred option was to
“Address connectivity issues and support iPads.” 
The rationale for this decision is that the unintended consequence of the
extensive use of iPads across Moray Schools is the detrimental impact iPads
have on the overall performance of the Education ICT network by constantly
needing to download up-dates and thereby draining the education network of
bandwidth. This is a major factor contributing to slow logon times and poor
network performance as experienced by many ELC settings and Schools. 
The solution as outlined in this Business Case is the procurement of a Mobile
Device Management System (MDM) that is designed to support Apple
products such as iPads. 
Page 119

Page 120

Intermediate Project Business Case
Page 4 of 41 
The Business Case notes that there are a range of different MDM options that
would result in improved network performance. However, the identification of
the optimum option for this Council would need to be based on the outcome of
a procurement exercise. 
Nevertheless, the indicative cost for this preferred Business Case option is
£74,000-£80,000. Thereafter, there would be an annually recurring cost of
£8,000-£9-000 to support 1500 iPads. This cost would depend on the
outcome of the procurement exercise. 
One of the risks identified in the Business Case is that enhanced
infrastructure support for iPads could result in an increased up-take of these
devices across Moray Schools. Annual costs could therefore escalate above
the estimated cost of £8,000-£9,000 to support 1500 devices. 
If the preferred option identified in this Business Case is endorsed, then a
detailed Implementation Plan would be developed. The execution of the plan
would be undertaken by senior officers within ICT, supported by the temporary
ICT technician post and overseen by the Head of HR, ICT & Organisational
Development. 
It should be noted that workshop participants were clear that any future
investment programme leading to the increased procurement of 1:1 devices
by the Council would need to be based on an extensive engagement exercise
with both learners and teachers. However, the increased up-take of iPads
over the last 10 years requires an immediate solution due to the impact that
the extensive use of Apple products is having on the overall performance of
the Council’s ICT Infrastructure Network. 
Presently, Council policy is to provide minimal support for iPads and the
procurement of Apple products is at the discretion of each individual school. 
Page 120

Page 121

Intermediate Project Business Case
Page 5 of 41 
1.0 Introduction
For this Business Case, digital learning is defined as “any instructional
practice that uses technology to strengthen a learner’s learning experience. It
can be used to provide professional learning opportunities for teachers, to
reduce teacher workload, improve marking and feedback to the learner, and
to provide personalised learning for learners”. (Achieving Excellence in
Learning Play Your Part, Inspire Learning Programme Data Report - update to
Scottish Borders Council, October 2021). 
Digital learning can therefore refer to the digital tools used to enable or
manage learning in education, including: 
• Resources
• Hardware
• Software
• Storage
• Systems
While the previous Digital Inclusion Outline Business Case explored the
relationship between the curriculum, the attainment gap, the learning estate
and supporting inclusive economic development, this Business Case has a
specific focus on making sure that the ICT infrastructure is in place to support
digital learning for the immediate future. 
A glossary of the terms used throughout the document can be found at the
end of the Business Case (Appendix 1). 
2.0 Background
In 2018, the Council has established an Improvement and Modernisation
Programme (IMP) to deliver transformational change across the authority.
The IMP contains eight workstreams including the Raising Attainment:
Curriculum Breadth and Digital Delivery. This workstream aims to provide and
enable a digital learning environment to improve equity and access to the
curriculum in order to deliver a range of outcomes.
These outcomes include:-  
• Improvement in attainment; 
• Improvement in employability skills and sustained, positive
destinations;
• Reviewing and transforming the learning environment; 
• Improved attainment at both the Broad General Education and Senior
Phase; 
• Young people are better prepared for life beyond school and for the
workplace
Page 121

Page 122

Intermediate Project Business Case
Page 6 of 41 
• Providing and enabling a digital learning environment to improve equity
and access to curriculum;
• Developing staff skills to improve learning and teaching, including
digital Quality focus on improving learning and teaching; and
• Releasing and enabling leadership capacity.     
On the 14 December 2022, an Outline Business Case (OBC) was presented
for consideration to the Education, Children’s and Leisure Services
Committee. 
The Outline Business Case presented evidence to reaffirm and support the
contribution that digital inclusion can make to realising the above outcomes
aligned to the Raising Attainment: Curriculum Breadth and Digital workstream
and outlined 3 investment options for consideration by Committee. 
These options are based on a staged approach to the development of digital
inclusion in Moray’s schools which may allow for preparations to be made
pending a future investment from this authority or from the Scottish
Government. 
Relating to an ascending order of investment for the Council each of the
following stages correspondents to an option for investment and ranged from:-
• Stage 1: This stage is focused on preparing and developing the ICT
infrastructure to ensure readiness for digital development and of the
Education Digital strategy and approach. This would include ensuring
that the school digital environment is ready for the increased use of
devices and curriculum tools     
• Stage 2: Prepare the workforce ensuring that they have the leadership,
skills and digital confidence they need and that a culture is created to
support enhanced use of digital in schools by preparing pupils and
parents and ensuring support is available for the new approach; and 
• Stage 3: The roll out of devices to staff and pupils at a scale and over a
time period that is affordable and takes account of any external
investment, in particular from the Scottish Government. This is likely to
be over a number of years, for example Scottish Borders invested over
a 7 year period; 
This staged approach had been informed by a report commissioned from CGI
Consultancy in order to provide a way forward to progress the development of
digital education that would represent a more affordable approach given the
council’s financial position.
Page 122

Page 123

Intermediate Project Business Case
Page 7 of 41 
Following consideration of the OBC and the accompanying report, Committee
agreed to:- 
• “continue with the development of the infrastructure and Education
Digital Strategy development to ensure readiness for digital
development only” (para 9 of the minute refers). 
It was also agreed to:- 
• “note that the next steps for the development of the Raising Attainment
Breadth and Digital project would include stakeholder engagement and
preparation of Full Business Case to inform the options and approach
to the project” (para 9 of the minute refers).   
3.0 Purpose
To this end, the parameters of this Business Case will be defined by what was
agreed by the Education, Children’s and Leisure Services Committee.
The Business Case will therefore relate to stage 1, as noted above, and will
focus on the:- 
➢ ICT infrastructure requirements thus aiming to ensure that this authority
is in a position of readiness for any future investment in digital devices
across its learning estate.
Also as agreed by Committee, the preparation of the Business Case has
primarily been developed by conducting a workshop with Head Teachers from
Primary and Secondary Schools, ICT Officers and Learning Estate Officers. 
The approach adopted for this workshop is outlined in section 9 of this
Business Case. The output of this workshop has then informed 4 options for
consideration and will be subjected to the selection criteria based on the
Critical Success Factors. The rationale for the selection criteria has been
informed by consideration of The Strategic Case, The Economic Case and
Finance Case as outlined in this Business Case. 
Based on the application of the selection criteria, a proposal will be made for
Committee to approve. 
Finally, the approach to implementing the selected option will be outlined in
The Management Case (Section 12) of this Business Case. 
Page 123

Page 124

Intermediate Project Business Case
Page 8 of 41 
4.0 The Benefits
There are 3 groups that are intended to be the main beneficiaries of the
preferred option that is identified in this Business Case. These groups are:-
Moray Learners: Improving the digital infrastructure will support a quality
learning experience that will contribute towards the following Improvement
and Modernisation Programme outcomes.
➢ Improvement in attainment at both the BGE and Senior Phase;
➢ Improvement in employability skills and sustained positive destinations; 
➢ Young people are better prepared for life beyond school and for the
workplace;
➢ Providing and enabling a digital learning environment to improve equity
and access to the curriculum; and
➢ Quality focus on improving learning and teaching.
Teaching Colleagues: Improving the digital infrastructure will support a
quality teaching experience by:-
➢ Spending more time teaching and less time repeating time consuming,
non-teaching activities;
➢ Giving each learner parity in the way they access learning;
➢ Innovating learning solutions; and
➢ Personalizing the learning style to suit each individual learner. 
Administration (Non-Teaching Colleagues): To operate effectively,
improving the digital infrastructure is also necessary for Business Support for
ELC Settings, Primary and Secondary Schools in relation to:-
➢ Ensuring that schools can fully utilise digital platforms such as iPay,
Parentsportal, Groupcall Xpressions and SEEMiS;
➢ Administration staff are enabled to work remotely; and
➢ Provide an efficient service. 
The Business Case aims to support the realisation of these benefits. 
5.0 The Strategic Case: Infrastructure Support for
Digital Learning
Following consideration of this Business Case by Committee, it is the intention
that the approved option will add value to the work already undertaken by ICT
colleagues in supporting digital learning across the Council’s 24 Early
Page 124

Page 125

Intermediate Project Business Case
Page 9 of 41 
Learning and Childcare settings, 46 Primary Schools and 8 Secondary
Schools (See Appendix 2). 
To provide context, this section will provide a brief overview of the work
undertaken to date by ICT colleagues to support digital inclusion across the
Council’s learning estate. 
It will also identify the issues that have not been able to be fully addressed to
date which were further explored by the Digital Inclusion workshop. 
5.1 Hardware
ICT investigation and analysis indicates that there are a number of different
elements that are likely to have an impact on connectivity within schools.  
This is reflected in that a significant number of the helpdesk calls received
from schools relate to persistent slow logon times when teaching and non-
teaching staff attempt to log into devices (desktops and laptops). This
inevitably impacts on class lesson time and undermines the full curriculum
offer. 
A common misconception is that the sole reason for slow login in times and
poor connectivity is due to insufficient bandwidth supplied to schools. 
While bandwidth can be a factor, in practice, it is one of a range of factors that
affects logon times. Other factors include use of legacy devices (e.g. Windows
7 devices), use of staff profiles used (now all adjusted), impact of large
Microsoft updates, roaming profiles which downloaded at each login (and then
uploaded at log out) and the increased adoption of iPads. 
As from the end of April 2023, all remaining W7 devices in schools have been
switched off from the Education network and a planned programme of
removal is in place. 
5.2 Mobile Device Management (MDM)
Another factor that ICT colleagues have identified as impacting on
performance is the multiple use of different types of devices on the overall
performance of the ICT Education Network. 
Some teachers for example consider that iPads are the optimum learning
device for some learners, and a number of schools would prefer to spend their
budget on technology such as iPads, which are not supported by ICT, beyond
initial connection to the network as agreed by Education. This would
complement the provision of Windows desktops and laptops within schools. 
Page 125

Page 126

Intermediate Project Business Case
Page 10 of 41 
However, without a proper MDM (Mobile Device Management) these
additional devices add to network issues and contribute to the detrimental
impact on overall performance and logon times. 
With the number of multiple devices being used within schools such as iPads
having increased in recent years, there has also been a corresponding impact
on network performance. 
The following table illustrates the year on year increase in the number of
iPads purchased across Moray Schools. 
In 2014 there were a total of 28 iPads purchased. By 2023, the year on year
cumulative total had increased to 1524 devices. This represents an increase
of 5343% in less than 10 years.   
It could therefore be expected that if the upward trend in using iPads
continues, then further pressure will be added to the ICT Education Network. 
The reason why iPads in particular are having a disproportionate detrimental
impact on the overall education ICT network performance is that when
connected the frequency of their up-dates is comparatively higher than other
devices. Moreover, the bandwidth required for these up-dates is significantly
bigger than other devices. 
ICT colleagues have also reported that there are concerns over how the
updates are applied. In most cases the iOS (iPhone Operating System)
updates must be downloaded and be applied on a home network as they will
not download on the Moray education network, due to slow network speeds
and Smoothwall sign in timeouts. 
Moreover, the need to regularly sign-in to SmoothWall on the iPads during
lessons is also a major issue for teachers. The iPads need re-logged into
0
200
400
600
800
1000
1200
1400
1600
1800
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Total iPads Purchased By Year
Total Cumulative Total
Page 126

Page 127

Intermediate Project Business Case
Page 11 of 41 
SmoothWall part-way through lessons and queues form with learners unable
to complete or save work. 
To-date, ICT have supported schools by increasing the sign-in times for
SmoothWall and have taken a similar position to the use of W7 devices by
advising School SLTs of the detrimental impact on overall network
performance by procurement devices that are not supported by the ICT
Education Network. 
The decision to procure an MDM to support other devices (e.g. iPad) would
require a significant investment and is further explored in the workshop
section of this Business Case. 
5.3 Bandwidth 
The final major factor that impacts on logon times and overall network
performance is bandwidth. 
In 2021, School Technicians undertook an exercise to visit every Moray
School to gauge how effectively IT Education Network was working within the
school learning environment. 
Their report identified:- 
“that some, but not all, of the schools have acceptable capacity to sustain
multiple logons, but there is evidence to suggest an increase in bandwidth
would be required should the roll numbers grow even slightly, or if usage is
increased. Bandwidth requirements seem to be calculated based on school
roll numbers and thus the number of educators and learners accessing the
network. Physical location, available broadband technology in the area and
overall distances will have a bearing on what link speed a school has been
allocated. 
As specified in the Network Testing Plan, the speed tests used are not
definitive as the results will vary depending on the type of connection that a
school has, but they do provide data which allows similarly specified sites to
be compared. 
During testing it was observed that schools with low roll numbers usually have
10Mb/s connections, whereas at the opposite end of the spectrum up to
160Mb/s was available to some slightly larger schools. Several of the 10Mb/s
linked schools often showed results that only a small portion of that bandwidth
was left available, even at low usage times. During the day (over a minimum
testing period of 4.5 hours) only 0.45 Mb/s was recorded as being available,
several times at a few of the schools, and this reduced network efficiency
drastically, causing long logon times and issues with saving and even
Page 127

Page 128

Intermediate Project Business Case
Page 12 of 41 
renaming files. The exact values generated by the test software may not be
entirely accurate in comparison to ICT’s internal monitoring; however, they are
representative of what was observed by the ICT Technicians during their time,
no less than 4.5 hours, in each school” (School Health Check Observation
Report, Moray Council, 28 10 21). 
As noted above, there are broadband connectivity factors which are outwith
the control of this authority. This includes the physical location of the school,
available broadband technology in the area and overall distances which will
influence the link speed. 
Wherever possible, ICT colleagues aim to address bandwidth connectivity
related issues logged by the School via the Helpdesk. Nevertheless, as
highlighted during the Workshop (Section 8), bandwidth connectivity is still a
major issue. 
5.4 Conclusion
The Moray Council Learning Estate continues to experience significant
connectivity issues in many schools. This is despite the actions noted above
in relation to removing obsolete W7 devices, advising schools on the
detrimental impact of procuring multiple devices on network speed such as
iPads and addressing logged school help desk calls as they arise. 
A pre-requisite for any of the improvement options arising from this Business
Case is to make a positive impact on these issues.   
6.0 The Economic Case 
The OBC provided an overview of the impact that digital technologies will
have on the global economy and on the Moray economy and the implications
in terms of skills development. 
For Moray, with a heavy reliance on traditional manufacturing jobs, this
challenge is more acute than in other parts of the UK. 
Previously included in the OBC, the following table published by the World
Economic Forum (2020) highlights the challenge for Moray when considering
the expected future transition from traditional occupants to new jobs based on
digital and STEM based skills. 
Page 128

Page 129

Intermediate Project Business Case
Page 13 of 41 
Decreasing Demand Increasing Demand 
1. Data Entry Clerks Data Analysts and Scientists
2. Accounting, bookkeeping and
Payroll Clerks
AI and Machine Learning
Specialists
3. Administrative and Executive
Secretaries
Big Data Specialists
4. Accountants and Auditors Internet of things Specialists
5. General and Operations
Managers
Digital Transformation Specialists
6. Client Information and Customer
Services Workers
Process Automation Specialists
7. Assembly and Factory Workers Information Security Analysts
8. Business Services and
Administration Managers
FinTech Engineers
9. Statistical, Finance and
Insurance Clerks
Database and Network
Professionals
10. Bank Tellers and Related Clerks Business Development
Professionals 
This shift in the skills base presents a particular challenge to the education
system which is reflected in the Curriculum for Excellence and the Council’s
own Digital Innovation Strategy for Education and STEM. 
Furthermore, the widely publicised exponential growth in AI, including Chat
GPT, and the development of Immersive Technology adds to the challenge of
developing a digital learning infrastructure within our schools that will support
the learning needs of children and young people as we enter an era where
jobs of the future will be overwhelmingly digital and STEM based. 
6.1 Conclusion
While The Strategic Case within this Business Case identified what could be
described as the minimum requirement in terms of supporting the digital
infrastructure within Schools, The Economic Case highlights that developing
Page 129

Page 130

Intermediate Project Business Case
Page 14 of 41 
digital technologies will impact on future jobs and the skills that schools will
need to develop in the present day. 
Since digital technology, such as AI, is developing at an exponential rate it is
difficult to accurately predict what these skills will be. A balance between
continuing to use Windows products –which reflect the overwhelming use in
the majority of workplaces- as a means to equip learners with a rounded
experience of the world of work will continue to be the basis of School ICT
provision. However, the Council will need to monitor developments in digital
technology and respond appropriately. 
The associated risks with striking the right balance is outlined in the risk
section of this report. 
7.0 The Financial Case
An important assumption is that there will be sufficient finances to support
infrastructure development for all identified scenarios. Funding would be
available from a range of sources. 
The following potential investment sources have been identified. 
➢ The Devolved School Management (DSM) Budget for Schools; 
➢ The Council Transformation Reserve Budget; and 
➢ On 26th January 2022, Council agreed that up to £50,000 could be
used for external consultancy engagement in terms of strategy
development. To-date £14,151 has been committed. The remaining
£35,849 could also be allocated to appropriate elements of this
initiative. The Source of this funding was Transformation Reserves; an 
There is therefore funding available to enhance the Council’s learning estate
digital infrastructure. 
Page 130

Page 131

Intermediate Project Business Case
Page 15 of 41 
7.1 Conclusion
As noted above, a number of different sources of internal Council funding are
potentially available to support digital infrastructure. 
These sources include the remaining £35, 849 of the award made by the
Education, Children’s and Leisure Services Committee on 26 January 2022
from Transformation Reserves and, if appropriate from the Devolved School
Management (DSM) for individual schools.   
8.0 Critical Success Factors 
Based on The Strategic Case, The Economic Case and The Financial Case,
the following critical success factors can be identified. 
Improving Connectivity: as outlined in The Strategic Case, options would
need to be considered in relation to their potential to improve performance
and connectivity within ELC Settings and Schools. 
Supporting Learning Outcomes: as outlined in The Economic Case, the
preferred option would be assessed against their potential to support future
digital learning developments. 
Affordability: as outlined in The Financial Case, there is a budget of
£236,000. The preferred option will need to cost no more than this amount.
The above critical success factors will be adopted as the selection criteria and
applied to the scenarios generated from the Backcasting Workshop. 
9.0 The Backcasting Workshop 
In accordance with the committee recommendation, a staff workshop was
held to develop possible investment scenarios that could then be translated as
investment options for this Business Case. This would form the basis for
identifying the preferred option in line with the purpose (section 3.0) and
benefits outlined in this report (section 4.0). 
9.1 The Backcasting Workshop Objectives 
Held on 19 April 2023, the staff workshop adopted the following objectives:- 
• To first of all determine what the ICT infrastructure requirements are in
the short term to envision a range of possible digital inclusion futures
for Moray learners; 
Page 131

Page 132

Intermediate Project Business Case
Page 16 of 41 
• To then consider the device infrastructure, connectivity infrastructure
and social (workforce) infrastructure that will require to be put in place
to realise these possible future digital inclusion options for the Moray
learning estate; and 
• To use the input, output and outcome insights from this exercise as the
basis of the Business Case that outlines a range of costed options and
which will then inform an implementation plan.
To help ensure an informed discussion took place, invited participants aimed
to strike a balance between Head Teachers (Primary and Secondary), ICT
colleagues, Learning Technologists and colleagues from the Learning Estate.
A list of colleagues is listed (See Appendix 3). 
The 3 hour workshop was chaired by Martyn Wallace, Chief Digital Officer,
Scottish Local Government. 
9.2 Scenarios Generated 
Working backwards, workshop participants were first of all asked to
brainstorm and consider what the digital inclusion futures for Moray learners
would look like. 
The premise of the workshop is that the investment in the infrastructure would
ideally need to be aligned and able to support each of these possible digital
future scenario, albeit within the parameters of the available financial resource
available (see section 7 of this report). 
The following scenarios were agreed. These scenarios range from minimal
investment (scenario 1) to scenarios which would necessitate more significant
investments. 
Scenario 1: While there is no transformative investment in terms of the
provision of 1:1 devices (i.e. a significant investment in devices), there will
nevertheless be a focus on further improving broadband connectivity across
the learning estate. 
Scenario 2: While there is no transformative investment in the provision of 1:1
devices, broadband width is increased to not only enhance current school
connectivity (scenario 1) but also to support teachers to utilize emerging
innovations such as virtual reality and immersive technology within the
classroom. 
Scenario 3: A phased investment programme is initiated for 1:1 devices that
is focused on the rollout of google products (e.g. chromebook). This
investment is in addition to enhancing broadband connectivity (scenario 1)
and increasing broadband connectivity to support the use of virtual reality and
immersive technology (scenario 2).
Page 132

Page 133

Intermediate Project Business Case
Page 17 of 41 
Scenario 4: A phased investment programme is initiated for 1:1 devices that
is focused on the rollout of Apple products (e.g. iPads). This investment is in
addition to enhancing broadband connectivity (scenario 1) and increasing
broadband connectivity to support the use of virtual reality and immersive
technology (scenario 2). 
Scenario 5: A phased investment programme is initiated for 1:1 devices that
is focused on the rollout of Windows products. This investment is in addition
to enhancing broadband connectivity (scenario 1) and increasing broadband
connectivity to support the use of virtual reality and immersive technology
(scenario 2). 
Scenario 6: A phased investment programme is initiated that is focused on
the adoption of a hybrid approach to the provision of 1:1 devices (e.g.
google, windows and/or apple products). This investment is in addition to
enhancing broadband connectivity (scenario 1) and increasing broadband
connectivity to support the use of virtual reality and immersive technology
within the classroom (scenario 2). 
Scenario 7: The infrastructure is developed to support Moray learners to
bring their own device to school. 
9.3 A Logic Modelling Approach 
The workshop was based on undertaking a logic modelling approach to
identify the outputs and the inputs which are aligned to each of the above 7
possible future digital inclusion scenarios. The format of this approach is
outlined in the diagram below (Diagram1). 
Diagram 1: Logic Model Format for each of the Identified Scenarios
Page 133

Page 134

Intermediate Project Business Case
Page 18 of 41 
Following the identification of possible future scenarios and then working
backwards, workshop participants explored issues relating the themes of
device infrastructure, connectivity infrastructure and social infrastructure under
in both the “output/process: what we need to address?” and the ‘input: what
do we invest columns” which is required to enable these future scenarios to
be realised. 
These terms have been adopted from the Scottish Government’s Digital
Learning Discovery Research Report. The scope of these terms are as
follows:- 
Device Infrastructure: This refers to mobile device management systems
(MDM) and the digital technologies currently deployed or which could
potentially be procured in the future. 
Connectivity Infrastructure: This refers to ensuring that each school has
sufficient broadband width to meet current and future digital supported
learning needs. Presently, as a rough rule of thumb, secondary schools
should be able to access 1GB and primary schools 100 MBS. However,
caution is advised in terms of establishing a standard since other factors such
as the size of the school roll should also be taken into account.  
Furthermore, it may be the case that bandwidth would need to further
increased if future scenarios such as virtual reality or the universal roll out of
1:1 devices is to be realised. 
Page 134

Page 135

Intermediate Project Business Case
Page 19 of 41 
Social Infrastructure: This refers to the workforce and would cover the
possible need to appointment members of staff with relevant skills set to
support the possible future digital inclusion scenarios. 
It is proposed that using the same standardised terminology as the Scottish
Government report will be a consistent approach to national discussions on
progressing digital inclusion. 
9.4 Scenario Summary 
Following the logic modelling approach, the scenarios were completed by
participants at the workshop. It should be noted that scenarios 3 to 6 were
merged together since the same issues were apparent regardless if Google,
Apple or Windows products are adopted. These scenarios are included at the
end of this Business Case (See Appendix 4). 
A separate template will be used for backcasting outputs and inputs in relation
to each future outcome scenario. 
A summary of the cross cutting themes that emerged from the backcasting
exercise are as follows:- 
• Connectivity to and in the school (intra and inter) e.g. connectivity to
the door and service within the school estate (Wi-Fi/hot spots). It was
noted that what is fit for one school building (infrastructure), may not be
for another;
• It was commented that the level of digital capability and connection
across the school estate is massively variable; 
• All are aware of the mobile connectivity limitations across Moray due to
for example rurality and SWAN limitations; 
• Private sector investments will have an impact on the devices which
are ‘best suited’ but we should not focus on one particular kind of
device for ‘future proofing digital infrastructure for schools’ as sector
focus can fluctuate based on demands;
• It was highlighted that iPads require a separate network connection
and the connection issues surrounding this operating systems (OS); 
• Multiple MDMs require additional manual work/resources to maintain
and manage the network, software, licences and devices; 
• Overall connectively covers a wide range of devices, it is not just
laptops and Windows OS;
• Seamless ways of working, for example, Glow – currently cannot work
between online and App versions; this syncing is disabled and causes
frustrations with staff and learners;
• Staff using multiple devices to access various software; 
• We need to get to the root cause of the problems across the school
estate and address where possible;
Page 135

Page 136

Intermediate Project Business Case
Page 20 of 41 
• Not all schools will have the same concerns/issues; 
• There is not one thing or one solution to manage; there is many strands
and work is underway in various areas; and
• The educational benefits and return on investment of immersive
technology (e.g. immersion rooms and VR) are questionable at this
stage and should not represent an immediate investment priority for
this authority while connectivity issues need to be addressed.
The shortlisted options outlined in the following section have been informed by
this scenario setting exercise. 
9.5 Options and Appraisal 
The scenarios generated from the backcasting workshop can be translated
into the following 4 options. Selection criteria have been applied to each
option and assessed on a scale of 1 to 5 (with 3 being the highest and 1 being
the lowest score). 
Option 1 Address connectivity issues and support Ipads (scenario 1)
Outcome While there is no transformative investment in terms of the
provision of 1:1 devices, there will nevertheless be a focus
on further improving broadband connectivity across the
learning estate.
Description This could be described as the minimum investment option.
The immediate focus is improving ELC and School logon
times and connectivity. The inclusion of supporting iPad
devices -through an MDM- is not only a reflection of the
significant uptake of Apple devices in recent years but also
the detrimental impact that iPads have on the ICT Education
Network performance if not supported. 
In addition, the network connectivity for Moray Council
Schools is currently delivered via the Scottish Wide Area
Network (SWAN); a managed service.  The use of ICT has
grown dramatically leading to higher demands for network
connectivity than previously anticipated.  The Council is
focused on providing Schools with the connectivity that they
need to deliver high quality learning and teaching whatever
the future brings. 
A temporary Senior ICT Officer post is currently in place to
specifically focus on improving schools connectivity and it is
proposed that an extension to this resource would enable
further work to be carried out that builds on current progress
and to support the installation of the MDM. The salary costs
for a 12 month extension to this post would be £56,000. 
Page 136

Page 137

Intermediate Project Business Case
Page 21 of 41 
Selection Criteria
Improving
Connectivity
Addressing connectivity and slow logon times is the
focus of this option.
3
Supporting
Learning
Outcomes
This criteria will be addressed by improving logon
times thus improving the teaching and learning
experience. Other options have a stronger focus on
learning outcomes.
2
Affordability As the minimum investment option, this is the most
affordable. This cost estimate includes an annual
licence fee (i.e £8,000 based on 1500 devices). 
Estimated Cost: £74,000-£80,000
3
Comment Improving connectivity was identified as the top priority by
participants who took part in backcasting workshop. While
an agnostic position should be taken on the merits of 1:1
device compared to another until a teacher and learner
engagement exercise is undertaken, the significant increase
in the number of iPads in use over the last 10 years, should
be supported by the ICT Education Network if connectivity is
to be further improved. 
Total Score 8 
Option 2 Address connectivity issues and support a 5G Classroom
within each of the 8 ASG areas (scenario 2)
Outcome While there is no transformative investment in the provision
of 1:1 devices, broadband width is increased to not only
enhance current school connectivity (option 1) but also to
support teachers to utilize emerging innovations such as
virtual reality and immersive technology within the
classroom.
Description Although other sources of funding would be available
through the Learning Estate Build Programme, this option
adds to option 1 by also including Virtual Reality and
Immersive technology support.
Selection Criteria
Improving
Connectivity
As per option 1, addressing connectivity and slow
logon times is an integral part of this option.
3
Supporting
Learning
Outcomes
This option also aims to utilise emerging innovations
such as immersive technology. A 5G classroom was
identified as a possible investment option although
such a development would be part of the Learning
Estates Investment Programme. Workshop
participants were however of the view that it was too
early to judge if emerging technologies represent 
2
Page 137

Page 138

Intermediate Project Business Case
Page 22 of 41 
best value in terms of making a positive impact on
learning outcomes.
Affordable While it is not possible to provide an accurate cost
estimate, providing infrastructure support for 5G
classrooms within each ASG area and other forms of
immersive technology would be outwith the indicated
budget. 
This is based on a conservative estimate of £200k
allocated to each of the ASG areas for a 5G
classroom in addition to the option 1 costs.                                          
Estimated Cost: £1.7m
1
Comment Until consistent logon times are established across ELC
settings and Schools, the investment in virtual reality and
immersive technology was considered by workshop
participants as a lower priority and 
Total Score 6 
Option 3 Support the use of multiple 1:1 devices (scenarios 3 to 6)
Outcome Support a hybrid approach -Google, Apple and Windows
products- and improve connectivity and broadband.
Description This option would require investment in multiple MDMS to
support a range of different 1:1 devices.
Selection Criteria
Improving
Connectivity
As per options 1 and 2, addressing connectivity and
slow logon times is an integral part of this option.
3
Supporting
Learning
Outcomes
As well as improving logon times this option aims to
develop an infrastructure to support any future
investment in 1:1 devices.
2
Affordability Multiple MDMs to support a range of different 1:1
devices will be more expensive than procuring a
MDM to support only Ipads. There would also be
increased training costs due to the need to support
multiple digital solutions. 
This cost estimate is based on an additional licence
fee per £8,000-£9,000 representing the purchase of a
further MDM to the costs noted in option 1 and a
1
Page 138

Page 139

Intermediate Project Business Case
Page 23 of 41 
further £10,000 to £15,000 for professional support
and training                                       
Estimated Cost: £81,000-£89,000 
Comment In light of the anticipated infrastructure costs, workshop
participants considered that an extensive engagement
exercise should first of all be undertaken before investing in
MDMs and the network infrastructure to support range of 1:1
devices. 
Total Score 6 
Option  4 Support Learners to Bring their own device (scenario 7)
Outcome The infrastructure is developed to support Moray learners to
bring their own device to school.
Description This option is based on the premise that asking learners to
use their own devices will reduce costs to this Authority.
Selection Criteria
Improving
Connectivity
Multiple MDMs would require to be installed to
support a range of different devices.
2
Supporting
Learning
Outcomes
If this is a viable option from a technical perspective,
it would have the same impact on learning outcomes
as the other options.
2
Affordability While this option would mean that there would no
need to invest in the universal provision of 1:1
devices, multiple MDMs would need to be
established and high level security risk (e.g.
proliferation of viruses) would need to be addressed.
Since more than one MDM would be required, the
cost estimate below is the same as option 3.                     
Estimated Cost: £81,000 - £89,000
2
Comment Since the device would be owned by the learner, the
Council would have very limited control over how the device
Page 139

Page 140

Intermediate Project Business Case
Page 24 of 41 
would be used. This would present a wide range of risk to
the Council. These risks would range from viruses infecting
the Education Network to reputational damage due to
inappropriate use. 
Total Score 6 
9.6 The Preferred Option 
The following is a summary of the scoring for each of the 4 options as outlined
in the above (section 9.5).
Option  Improving
Connectivity 
Supporting
Learning
Outcomes
Affordability
Total
1.Address connectivity issues and support iPads  3 2 3 8
2. Address connectivity issues and support a 5G
Classroom within each of the 8 ASG areas
3 2 1 6
3. Support the use of multiple 1:1 devices  3 2 2 7
4. Support Learners to Bring their own device  2 2 2 
Based on the application of the selection criteria, the preferred option is option
1: Address connectivity issues and support iPads. 
When exploring the options for procuring an MDM, ICT colleagues sought
specialist expert advice. The Council have been advised that there are
number of different approaches and products that could meet the
requirements of the preferred option. Most options would be based on annual
licence fee arrangement for each individual iPad. These options include In-
tune (OS Tool provided by Microsoft), Manage Engine and JAMF (both cloud
based products). 
In the context of this options appraisal, determining the optimum option for
Moray Council will require to be based on a procurement exercise.
Affordability would also be a key element of the procurement brief and
selection criteria. 
The high level procurement tasks are outlined in the Implementation Plan
section (See Section 12.2).   
Page 140

Page 141

Intermediate Project Business Case
Page 25 of 41 
9.7 Cost Profile 
As noted above, an accurate cost estimate can only be secured as a result of
undertaking a procurement exercise that weighs up the merits of a range of
different MDM options against an agreed specification. 
Initial estimates show a significant range in cost and for indicative purposes,
the cost profile below (line 3) relates to one possible option. Due to
commercial sensitivity, these potential providers are note named in this
Business Case. 
The £8, 531 noted is an annual cost based on £5.69 per device on just over
1500 devices. 
Item  Value
1. Senior ICT Officer support 
Salary costs for a 12 month post at grade 9. 
£56,000
2. Professional services for implementation
and training 
£10,000-
£15,000
3. MDM to support iPads through an
appropriate MDM solution. Cost per annum
based on the number of devices 
£8,000-
£9,000      
Total £74,000-
£80,000 
It should be noted that reference to training (row 3) relates to ICT and not
teaching staff. 
The Council funding source to meet these costs is noted in section 7. 
10.0 Main Risks 
The following are some of the high level risks that were either considered by
workshop participants or were subsequently identified. 
MDM: A different mobile device management system (mdm) will be required
for Google and Apple products. While providing both products may represent
the optimum option for education colleagues, a hybrid approach requiring
multiple mdms may be difficult and costly to manage. The example has been
given where if we are moving from 6,000 devices to 15,000 to 18,000 devices
there may be an exponential increase if a hybrid approach is taken. Multiple
MDMs would therefore result in increased running costs; 
Devices: Without undertaking a consultation exercise with learners, parents
and teachers, it is not possible to identify the optimum type of device to be
Page 141

Page 142

Intermediate Project Business Case
Page 26 of 41 
deployed across Moray. An investment in an MDM to support Apple products
may influence or determine the outcome of any future engagement exercise. 
Capacity: External consultancy support may be required to implement the
infrastructure support identified; 
Expectations: There is a risk that enhancing the ICT infrastructure for
schools may raise expectations of an imminent significant investment in digital
devices; and 
Security: While requesting that learners bringing in their own home device to
school, there is a heightened risk of viruses. Moreover, the Council may have
limited control of the appropriate nature of materials being accessed via their
own device. 
Benefits of iPad: An MDM to support Ipads does not reflect this documents
benefits statement (section 4.0) in relation to making learners ready for the
workplace, since iPads are thought to represent only a 24% share of the
device marketplace. As described in this Business Case, an MDM to support
Ipads is nevertheless necessary for an improvement of the overall network
performance.   
Payment based on the number devices:  There is risk that enhanced
infrastructure support for iPads could result in an increased up-take of these
devices across Moray Schools. Annual costs could therefore escalate above
the current estimated cost of £8,535 to support 1500 devices. 
11.0 Constraints and Dependencies 
There are 2 major constraints associated with this project. 
• Staff Capacity: The implementation of the preferred option will need to
contend with the constraints in releasing ICT staff who are otherwise
committed to other priorities. As well as funding backfill to release ICT
colleagues to undertake Implementation Plan tasks, it may also be
necessary to undertake an options appraisal leading the possibility of
tendering and outsourcing work to a specialist consultancy firm. 
• Funding: As outlined in Section 7 of this Business Case, there is a
finite budget to support this service improvement.
In terms of dependencies, the delivery of the curriculum for excellence is
predicated on a reliable ICT infrastructure. Similarly, for Administration
Business Support Staff a reliable ICT infrastructure is essential for utilising a
range of different digital platforms. 
Page 142

Page 143

Intermediate Project Business Case
Page 27 of 41 
These dependencies are part of the Councils Improvement and Modernisation
Programme (IMP) and relate to the outcomes listed in section 4 of this
Business Case. 
12.0 The Management Case 
The preferred option will be progressed in accordance with the arrangements
set out in 12.1. 
12.1 Project Reporting Structure 
If the preferred option identified in this Business Case is endorsed, then a
detailed Implementation Plan would be developed. The execution of the plan
would be undertaken by senior officers within ICT, supported by the temporary
ICT technician post and overseen by the Head of HR, ICT & Organisational
Development. 
12.2 The Implementation Plan 
Relating to the preferred option, an outline of the key tasks that will form the
basis of the implementation plan is highlighted below. 
Ref Activity Duration
(weeks)
Elapsed Time
(weeks)
1 Specification of Requirements 4 4
2 Options Appraisal 4 8
3 Procurement 8 16
4 Implementation (Core) 2 18
5 Testing 2 20
6 Training 1 21
7 Implementation (Devices) 6 27 
In addition, the approach to evaluating the impact of implementing the
preferred option will need to be developed and implemented. This is part of
the Benefits Realisation approach noted in Section 12.4. 
Following the approval of this Business Case, the Implementation Plan will be
up-dated and revised with further detail. This will include the responsible
officers –including the Senior ICT Officer temporary post- for progressing
specific milestones and tasks. Dependencies between milestones and task
and start and finish dates will also be detailed. 
12.3 Arrangements for Risks and Issues Management 
Page 143

Page 144

Intermediate Project Business Case
Page 28 of 41 
As part of the project governance arrangements, risks and issues will be
monitored by the project management group and mitigating actions taken. 
12.4 Arrangements for Benefits Realisation
The Project Management Group will also be responsible for implementing an
appropriate approach to determining the benefits resulting from this project.
This will include the establishment of baselines and the use of both
quantitative and qualitative measures.
Appendix 1: Glossary of Terms
AI Artificial intelligence (AI) is the simulation of human
intelligence processes by machines, especially computer
systems. Specific applications of AI include expert
systems, natural language processing, speech
recognition and machine vision.
Backcasting A planning method that starts with defining a desirable
future and then works backwards to identify policies and
programs that will connect that specified future to the
present.
Business Case
(Outline and
Full)
Moray Council adopts a 5 case model as the basis of its
Business Plans (Treasury Green Book). The 5 cases are
the Strategic Case, Economic Case, Financial Case,
Commercial Case and Management Case. The
difference between the Outline Business Case (OBC)
and Full Business Case (FBC) is the degree of detail
provided.  
Chat GPT As example of AI which has recently gained significant
media attention since it allows the user to have human
like conversations. It can answer questions and assist
with tasks such as composing emails, essays and writing
reports.
Cloud Cloud computing is a general term for anything that
involves delivering hosted services over the internet.
Commissioning Strategic commissioning is the term used for all the
activities involved in assessing and forecasting needs,
links investment to agreed desired outcomes,
considering options, planning the nature, range and
quality of future services and working in partnership to
put these in place.  
Page 144

Page 145

Intermediate Project Business Case
Page 29 of 41 
Connectivity
Infrastructure
This refers to ensuring that every school has sufficient
broadband width to meet current and future digital
support learning needs
Device
Infrastructure
This refers to mobile device management systems
(MDM) and the digital technologies currently deployed or
which could potentially be procured in the future.
Digital Learning Defined as “any instructional practice that uses
technology to strengthen a learner’s learning experience.
It can be used to provide professional learning
opportunities for teachers…and personalised learning for
learners.” 
Immersive
Technology
Immersive technologies create distinct experiences by
merging the physical world with a digital or simulated
reality. Augmented reality (AR) and virtual reality (VR)
are two principal types of immersive technologies.
Inputs The resources required to make something happen.
Issue When a risk does materialises and becomes a fact.  
MDM  Mobile Device Management System. Optimize the
functionality and security of devices. A different set up is
required depending on what product is adopted.
Outcomes This refers to the impact and change resulting from
inputs, process and outputs.
Outputs The immediate result of inputs and processes.
Risk A possible eventuality. In other words, something that
hasn’t happened. When evaluating a risk we consider
probability and severity. Linked to the concept of issue
SLT This is an abbreviation for School Leadership Team.
Smoothwall This is a web content filtering, safeguarding and internet
security system.
Social
Infrastructure
This relates to the workforce and covers teaching, non-
teaching and ICT colleagues.
Transformational
Change
Refers to a radical or significant change in the way that
services are delivered (i.e. non-linear)
W7 This is an abbreviation for Microsoft Windows 7. This is
an operating system that is now obsolete.
W10 This is an abbreviation for Microsoft Windows 10. This is
the current operating system used by the Moray ICT
Education Network. 
Page 145

Page 146

Intermediate Project Business Case
Page 30 of 41 
Appendix 2: Learning Estate Profile 
Primary Schools Number
1 Number of  Primary  schools  46
2 Number of pupils 6889
3 Number of teachers 475.39 FTE 
Secondary Schools 
4 Number of  Secondary
schools
8 
5 Number of pupils 5328
6 Number of teachers 454.88 FTE 
Early Learning and Childcare 
7 Number of ELC settings 24 Council 
38 PVIs
38 childminders 
8 Number of children 1600 approx
9 Number of ELC Practitioners 515 
Appendix 3: Digital Backcasting Workshop Participants 
Name Job Title
1 Martyn Wallace  (Chair) Chief Digital Officer, Scottish Local
Government
2 Frances Garrow  Head of HR, ICT & OD
3 Graham Cooper Infrastructure Manager
4 David McKay  Information Systems Manager
5 Stewart McLauchlan Quality Improvement Manager
6 Claire Johnson  HT, St Gerardines Primary School
7 Robin Paterson  Project Manager (Education)
8 Grahame Davidson  ICT Team Leaders (Support)
9 Andrew Hall Snr Project Manager (Learning Estate)
10 Shona Leese Snr Project Officer (Learning Estate)
11  Neil Johnson HT, Buckie Community High School
12 Louise Davidson  HT, Tomintoul Primary School
Page 146

Page 147

Intermediate Project Business Case
Page 31 of 41 
13 Jan Sinclair  HT, Forres Academy
14 Alison McCook  Learning Technologist
15 Euan Morrison Learning Technologist 
Page 147

Page 148

Intermediate Project Business Case
Page 32 of 41 
Appendix 4: Backcasting Scenarios 
Scenario 1 
Inputs  Output/Process  Outcomes
What do we invest?  What we need to address?  The Future     
Device Infrastructure 
• MDM provision to support a range
of different devices currently in
use. 
• It was highlighted that IPads
require a separate network
connection.   
Device Infrastructure 
• The increasing use of iPads means
that support for these devices needs
to be improved.   
Scenario 1: While there is no
transformative investment in
terms of the provision of 1:1
devices, there will
nevertheless be a focus on
further improving broadband
connectivity across the
learning estate. 
Connectivity Infrastructure 
•  Connectivity to and in the school
e.g. connectivity to the door and
service within the school estate
(Wi-Fi/hot spots). It was noted that
what is fit for one school building
(infrastructure), may not be for
another.
• It was acknowledged that the level
of digital capability and connection
Connectivity Infrastructure 
• Minimum requirements for schools
(e.g. 1GB for secondary schools and
100 MBS for Primary Schools was
discussed). We need SG / SFT etc to
provide guidance on the minimum
standard e.g.11GB per secondary
schools. 
Page 148

Page 149

Intermediate Project Business Case
Page 33 of 41 
Inputs  Output/Process  Outcomes
across the school estate is
massively variable.
• It was highlighted that IPads
require a separate network
connection. 
• Wi-Fi within schools e.g. Wi-Fi hubs
required within each school 
• A minimum expectation is that in
general coverage should be ‘quite
good’. If not then need to identify
what the issues are for each campus
– it isn’t just one thing that is causing
the current connection issues. Clear if
it is technical issues or provision of
access points that are causing
current connectivity issues; 
Social Infrastructure 
• Additional resource to support ICT
to undertake an assessment of
each ELC setting and School.
• Additional manual work/resources
to maintain and manage the
network, software, licences and
devices. 
Social Infrastructure 
• Health Check Assessment of ELC
Settings and Schools so that hot spot
/ black spots are (inc poor coverage)
are identified. Understanding
particular issues for each school and
identifying solutions resources where
possible. 
• Access to connectivity out with the
school and how to support this. 
• MDM support and latest products and
connectivity support. 
Page 149

Page 150

Intermediate Project Business Case
Page 34 of 41 
Inputs  Output/Process  Outcomes 
Risks
Technology and device -at which point do we decide which device has impact on attainment (proving outcome and
achievements) across the school years – this would assist in identifying which devices are the best option. 
Further Notes
• Connectivity to the school within the school and the infrastructure of the building (Wales example)
• Quality of service at the school – Perth & Kinross School. Help support new ways and styles of teaching and Scottish
Borders. Examples of learning/good standards are: 
“to the school”: Welsh digital education strategy model for the minimum standards for Primary Schools.
within the school”: Perth & Kinross Council Bertha Park school – fully enabled for digital education systems.  
• Each school building will need to be considered ad hoc as dependent 
• How are YP connecting at home. Mobile device connection are utilised and shared ad hoc. 
• Connectivity across LES is massive variable – most common theme is the Lag, but has gotten better but still lags. Some
areas wireless connectivity is good but some have numerous blackspots. 
• Connectivity wireless blind spots is okay in most areas but can only be access via a MC device. 
• IPad connectivity is on a separate network and requires additional resources/work to manage and keep the system is
updated. 
• Overall connectivity is for a wide range of devices not just laptop. 
• Glow – issues via desktop and App/Cloud – issues with connectivity and syncing. 
• Capacity of the system – variable across the LES. 
• Work has been undertaken by Learning Techs and ICT across the LES – many of which recommendations have been
completed. It might be worthwhile considering an updated scope. 
• Hayward Report – snr phase a third of learning/accreditation will be generated out with the school building – which means
devices will need to be mobile and able to be utilised within schools and out with. Tenancy and seamless learning. 
• In a school what is critical is that it is reliable, it works quickly enough that allows for 45 minutes of learning in a 50 minute
class rather than joining delays and unreliability of devices. 
Page 150

Page 151

Intermediate Project Business Case
Page 35 of 41 
• Reminder that the majority of legacy devices have already been removed from the school estates (phased programme).  
• Core provision will be refreshed on a reasonable period/ongoing basis by ICT. 
Page 151

Page 152

Intermediate Project Business Case
Page 36 of 41 
Scenario 2 
Inputs 
Output/Process  Outcomes
What do we invest?  What we need to address?  The Future     
Device Infrastructure 
• One suggestion was the
establishment of a 5G classroom
within each ASG area. This would
be a shared resource was all ELC
settings and Schools within each
ASG cluster 
Device Infrastructure 
• Establishment of a 5G classroom in
each ASG area. This could be
accessed by more than 1 school
within each ASG. 
Not focusing on the ‘new’ as it won’t
necessarily be the best option e.g.
VR/simulation/immersion   
Scenario 2: While there is no
transformative investment in
the provision of 1:1 devices,
broadband width is increased
to not only enhance current
school connectivity (scenario
1) but also to support teachers
to utilize emerging innovations
such as virtual reality and
immersive technology within
the classroom. 
Connectivity Infrastructure
• Enhanced broadband to support
VR headsets and other forms of
immersive technology. 
Bluetooth technology may require
to be invested in to support VR
and immersive technology. 
Connectivity Infrastructure 
• Bluetooth connectivity would
potentially have a significant impact
on the network and security. 
Social Infrastructure 
• Potential linkage to Early Years
STEM Moray Growth Deal and the
Learning Estate Programme. 
Social Infrastructure
Questions asked were- 
• What are the learning outcomes we
are trying to achieve? 
• What’s the attainment levels?
Page 152

Page 153

Intermediate Project Business Case
Page 37 of 41 
Inputs 
Output/Process  Outcomes 
• What’s the pathway plans from
schools to work 
• What are we trying to ensure YP skill
sets are when leaving school
• What industry requirements are
important that will feed into the skills
YP need ;
• Yet to see VR/simulation used within
a school environment in an effective
way.   
Risks
Since this is emerging technology it is considered unclear how immersive and VR technology will support learning outcomes. The
possible return on investment was considered to be debatable at this early stage in the development of these technologies
Alignment of learning outcomes and technology investments. 
Affordability in terms of available IMP budget is a risk. 
Further Notes
Have to be careful that immersion investment does not have the same impact as actual activities 
The digital devices have to improve the skills for the majority and not the minority within certain career/industry 
Good school connectivity does allow for expansive digital/online learning platforms that will expand curriculum but does require a
cost benefits analysis and digital upskilling.   
Page 153

Page 154

Intermediate Project Business Case
Page 38 of 41 
Scenarios 3 to 6 (Multiple devices) 
Inputs  Output/Process  Outcomes
What do we invest?  What we need to address?  The Future     
Device Infrastructure 
• Multiple MDMs will be required to
support the use of multiple
devices. 
• It was highlighted that additional
devices require a separate network
connection. 
Device Infrastructure 
• Need to be clear SQA requirements
and what their expectations are for
future school based learning. 
• Assess what capacity is there in
secondary schools to support multiple
device use. 
• Need to look at good practice for staff
e.g. one device that covers all
needs/solutions.  
Scenario 3-6: Support a
hybrid approach -Google,
Apple and Windows products-
and improve connectivity and
broadband. 
Connectivity Infrastructure 
•  Multiple MDMs will need to be
established 
Connectivity Infrastructure 
• As per scenario 1, a pre-requisite for
this scenario is consistent wi-fi
connectivity.
• Tenancy agreement options would
need to be explored.   
Page 154

Page 155

Intermediate Project Business Case
Page 39 of 41 
Inputs  Output/Process  Outcomes
Social Infrastructure 
• Device choice will have an impact
on ICT support. E.g. Google
Chrome via glow, tenancy.
• Multiple MDMs require additional
manual work/resources to maintain
and manage the network,
software, licences and devices. 
• Device Digital training for staff and
learners. 
Social Infrastructure 
• Through training, ensure that
teachers have the skills and
confidence to support learners. 
Risks
There is a risk that the provision of multiple devices at different stages of the journey through school will undermine the learning
experience.
Multiple MDMs will entail an increased cost. There is a risk that this scenario is not affordable. 
A teacher/learner engagement exercise would need to be undertaken to select the optimum type of devices to use. 
Page 155

Page 156

Intermediate Project Business Case
Page 40 of 41 
Scenario 7 
Inputs  Output/Process  Outcomes
What do we invest?  What we need to address?  The Future     
Device Infrastructure 
• Multiple MDMs will be required to
support the use of multiple devices
brought into school by learners 
Device Infrastructure 
• Schools would need to support a
range of different devices. This would
not only include charging point
provision.
• The ICT network would need to be
protected from any viruses that could
be introduced from a learners’ device.   
Scenario 7: The infrastructure
is developed to support Moray
learners to bring their own
device to school. 
Connectivity Infrastructure 
•  Multiple MDMs will need to be
established
•  
Connectivity Infrastructure 
• Would not be able to rely on Apps,
and various OS. Would need to be
browser based.
• There would be issues that would
need to be addressed about revising
the Council’s Network Policy in terms
of security and acceptable and
appropriate use 
Page 156

Page 157

Intermediate Project Business Case
Page 41 of 41 
Inputs  Output/Process  Outcomes 
Social Infrastructure 
• Device Digital training for staff and
learners. 
Social Infrastructure 
• Significant staff training would be
required to cover a range of different
types of devices. 
Risks
There is a risk that minimal filtering will result of inappropriate use of devices on school premises. This will lead to reputational
damage to the Council. 
While a policy of bringing your own device to school would aim to achieve equity, there is risk that inequity would persist in terms
of children and young people who have a device and those who don’t. Some brands may also be perceived as having a higher
status over others. 
There is a risk of demarcating when the Council has responsibility for the device and when responsibility lies with the child/young
person. For example, damage to device when on school property or virus review and up-dating. 
Page 157

Page 158

Page 158

Page 159

REPORT TO:   EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 19 SEPTEMBER 2023  
SUBJECT:  IMPROVEMENT AND MODERNISATION PROGRAMME: RAISING 
ATTAINMENT: IMPROVED WELL-BEING OUTCOMES 
(PASTORAL CARE) 
BY:   DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1  To update Committee on progress in the development of the Raising
Attainment: Pastoral Care project within the Council’s Improvement and
Modernisation Programme (IMP) and seek direction on the development of
the project. 
1.2  This report is submitted to Committee in terms of Section III (D) 1 of the
Council's Scheme of Administration relating to exercising all the functions of
the Council as an Education Authority. 
2. RECOMMENDATION 
2.1  It is recommended that Committee: 
i) Notes the inclusion of data in relation to the impact child planning
workload for Primary Schools (See Appendix 1a & 1b); 
ii) Notes the arrangements made to date and the work that is underway
to ensure that existing resources are allocated to maximise their
impact on the objectives of this project; 
iii) Notes that work will continue to explore and develop approaches
that would contribute to the Business Case outcomes via other
projects and funding with similar aims such as the Whole Family
Well-being and SEF funding; 
Item 10.*
Page 159

Page 160

iv) Requests that a monitoring report be provided to committee in 12
months on the extent to which the project outcomes have been
addressed through these alternative routes; 
v) It is recommended that the matter of administrative support for the
child planning process in schools is referred to the school business
administration project for consideration of an appropriate solution;
and 
vi) Agrees to cease this project (other than v) above) as part of the
Improvement and Modernisation Programme in light of the above
and on the basis that none of the options identified as part of the
Pastoral Care Outline Business Case offer a sustainable solution
that would continue beyond the time limited funding. 
3. BACKGROUND 
3.1  The Council established an Improvement and Modernisation Programme
(IMP) to deliver transformational change across the authority, which was first
approved by the Council on 12 December 2018 (para 5 of the minute refers). 
3.2  The original IMP contained eight workstreams, one of which focused on
Education related projects. A further report to Moray Council on 12 May 2021
(para 13 of the minute refers) outlined two Education workstreams for
development: Raising Attainment (Curriculum Breadth and Digital) and
Raising Attainment (Well-being). The Raising Attainment: (Well-being)
workstream contains a project relating to Pastoral Care in primary schools
which aims to improve outcomes for learners through early intervention. 
3.3  The purpose of the Pastoral Care project is to promote and safeguard the
health and wellbeing and safety of pupils in partnership with parents, support
staff and partners to ensure all children, young people and their families
receive the right support at the right time no matter the level of need.    
3.4  The outcomes that this project intended to achieve are:- 
• Increased attendance at school for some children; 
• Reduction in exclusions; 
• Reduction in violence and aggressive incidents; and 
• Increased attainment and achievement. 
3.5 These outcomes are closely aligned with the ASN Review and the broader
IMP raising attainment workstream outcomes (Appendix 1). 
3.6 Since the project was approved as part of the original IMP, the COVID
pandemic has further heightened concerns regarding the well-being of
children and young people and the consequent impact on the workforce in
Moray Council schools and Early Learning and Childcare (ELC) settings.
These concerns include reports of delayed progress in developmental
milestones such as language for children making the transition from ELC to
Page 160

Page 161

Primary 1 and the increase in the number of children and young people
exhibiting challenging behaviour which undermines learning and attainment. 
3.7 It is also important to acknowledge the growth in the nature and scale of
service demand arising from escalating numbers of children and young people
assessed as having Additional Support Needs (ASN), which is a national
pattern, and the number of children in Child’s Planning. Both bring increased
workload for Head Teachers (HTs), some of whom are class committed which
is impacting on their workload and time to lead school improvement. 
3.8 In light of these concerns, at the Special Meeting of the Education, Children’s
and Leisure Services Committee on 14 December 2022, “Committee agreed
to defer the report to get more information on the scope of the child planning
workload within the primary schools and whether partners have the
capacity/resources to support the collaborative work required to support the
child’s plan” (para 10 of the minute refers). 
3.9 This has been addressed by collating child planning data from 2 sources: 
SEEMIS in relation to the number of Child Plans in relation to each Moray
Primary School (Appendix 1a); and a questionnaire to all 46 Moray Primary
Schools. A total of 10 questionnaires were returned, which represents a
quarter of schools (See Appendix 1b). 
3.10 Viewed together, both sources of data show that:- 
➢ there is a wide variation in workload impact in terms of completing child
plans across Moray Primary Schools, ranging between up to 3 hours to
up to 16 hours;
➢ most primary schools that responded reported an increase in time
spent in completing child plans in the last 3 years;
➢ Growth in time spent was attributed to the growing trend in children
needing support and more complex issues requiring to be addressed; 
➢ there is a wide variation in terms of number of child plans held by each
school which cannot be solely attributed to the size of the school roll.
This ranges from 50 child plans for Millbank to 3 for Logie.
➢ when Head Teachers were asked to rank their preferred improvement
options, of the 5 options additional admin clerical support was the first
choice and a Senior Leadership Team member with a dedicated remit
for pastoral care was the fifth choice; and
➢ other comments submitted included the fluctuations during the year for
the completion of child plans and the particular admin challenges for
smaller schools. 
3.11 Based on this information, it could be concluded that while there is variation
from one primary school to another, the growing number and complexity of
child planning issues is increasing the workload for Head Teachers and their
staff. 
3.12 In order to provide support for this workload in primary schools, the ECLS
Committee agreed on 7 June 2023 to amend the Devolved School
Page 161

Page 162

Management Scheme (DSM) for schools without enhanced provision so that
the Head Teacher is non-class committed at a roll of 121 and above and the
Head Teacher is class committed for 2 days at a roll of 95-120. For primary
schools with enhanced provision, the Head Teacher is non-class committed at
a roll of 90 (para 13 of the minute refers) 
3.13 While the above investment may fall short of the scale of the transformational
change envisaged by this project, it is nonetheless aligned to the IMP
objectives and makes effective use of current recurring resources to support
these. 
3.14 It is acknowledged that there is ongoing administrative support required for
the child planning process and that a solution requires to be found to
effectively address this. However, IMP funding drawn from reserves to enable
change and transformation is not a suitable solution for a recurring service
pressure.  A separate item on this committee agenda provides an update on
the school business administration support review and this may offer a more
appropriate route to consider a solution for child planning administrative
support, therefore, it is proposed to refer this matter to that project for
consideration. 
Outline Business Case (OBC) 
3.15 Work has progressed on an OBC to ensure that options for the use of the
temporary funding from the IMP investment could be utilised.  The resulting
OBC identifies that the delivery of positive health and well-being outcomes for
Moray learners would benefit from a consistent pastoral care approach across
Secondary, Primary and ELC settings. 
3.16 The OBC was originally presented to a Special Meeting of this Committee on
14 December 2022 and presented a range of options which were
subsequently further developed by Officers.  The revised Outline Business
Case presents 4 options. 
3.17 Option 1 (Do nothing): In light of the Council’s challenging financial situation,
insufficient resources are available to fund a test of change that would have a
measurable impact and/or could be mainstreamed. 
3.18 Option 2 (minimal): make further minimal improvements within the
parameters of the current ‘as is’ model. This may include funding additional
teaching hours to release class committed head teachers from teaching
and/or increase PSA hours. This option would be in addition to the 2 extra
days provided to HTs who have a school roll between 95-121 pupils and the
support provided by NQTs. It should be noted that HT class commitment was
adjusted permanently by ECLS in June 2023 addressing this point and so this
option is removed. 
3.19 Option 3 (intermediate): Fund a Principal Teacher of Pupil Support for a
single Primary School and associated ELC settings for a 2 year test of
change. 
Page 162

Page 163

3.20 Option 4 Intermediate (Moray team Remote): Fund 2 Pastoral Care Officers
for a 2 year period. Each Pastoral Care Officer would be responsible for
primary school clusters in 4 ASG areas (i.e. both posts combined would cover
all 8 ASGs). 
3.21 The above options were evaluated against a range of critical success factors.
These criteria are strategic fit, affordability, scalability and the ability to be
evaluated. 
3.22 While options 3 and 4 were considered as offering a strategic fit, the cost of
undertaking a 2 year test of change has been estimated as between £100,000
to £200,000 depending on the grade of the post. 
Wider Context and Overview
3.23 Since the inception of the Pastoral Care project there have been a number of
significant developments that influence this area of work and the
considerations to take it forward. This includes a number of important national
developments in terms of thinking how best to support the delivery of
improved well-being outcomes to children, including a Whole Family Well-
being holistic approach.  The considerations are set out below. 
3.24 Council financial position - this project was originally initiated in 2019, before
the COVID-19 pandemic and at a time when the Council had a more positive
budget position with scope for investment. The initial estimated cost of
£100,000 to £200,000 to undertake the pilot is now therefore not considered
to be affordable.  In this context, the future cost of mainstreaming the pilot -if it
was deemed to be viable- would not be financially sustainable at the current
time. 
3.25 Covid impact and increasing needs – the impact of the covid-19 pandemic on
children and young people and their families is acknowledged as well as the
ongoing issues facing families in the current economic climate and this must
be built into future core service delivery plans.  These needs are now very
evident and schools are striving to ensure that individual needs are met within
the current system.  The ASN Review is considering how to plan for this in
future by taking account of developing need and learning taking place through
the moderation exercise that is currently underway to assess ASN needs and
support in schools across Moray to ensure the best is made of current
resources. 
3.26 Demands from supporting child’s planning process – the evidence of this
impact is being seen in the increasing number and complexity of cases in the
child’s planning process.  There is a need to ensure that support is in place to
make this as effective as possible.  As noted above, an adjustment has been
made to DSM to ensure more head teacher time is available in smaller
schools. 
3.27 Alternative funding with similar aims – recognising these issues of increasing
demand, alternative funding streams have been emerging which have similar
aims and new services will emerge, for example the counselling service for
Page 163

Page 164

school pupils. The Whole Family Well-being Fund (WFWF) (£500m over
2022-26) was put in place by the Scottish Government in response to the
covid pandemic.  It aims to help to support holistic family services to reduce
the need for crisis intervention and to shift incrementally towards prevention
and early intervention. Funding is disseminated through children’s services
partnerships who are required to drive the delivery of services in their area. 
The Moray Partnership (Girfec Leadership Group) is currently developing
proposals for the use of local funding. Strategic Equity Funding (SEF)
announced in November 2021 is a further example of funding aimed at
improving outcomes for children and young people impacted by poverty, with
a focus on tackling the poverty related attainment gap.  This is being phased
over 4 years with Moray set to receive £675,000 by 2025/26. 
3.28 Directing of existing funding and resources – the council has already made
decisions to support the issues outlined above through deployment of
transformation funding as well as core budget both on a temporary basis
towards Additional Support Needs (ASN) services and by permanently
reducing the class contact time for Head Teachers in smaller schools to
support the child planning process.  A number of posts within the broader
ASN central services have been temporarily held vacant to provide flexibility
to meet future demand and to align to the service models that will emerge
from the ASN review work.  These resources will also support the aims of the
Raising Attainment Wellbeing project outcomes as the services adapt to new
approaches. 
3.29 Emerging service delivery models in other authorities – the issues in Moray
are not unique and other local authorities and children’s services partnerships
have also been working on solutions to support better outcomes for children,
young people and their families.  This is an area of developing work but there
are a number of alternative models emerging that use a multi-disciplinary,
cross service and cross agency approaches.  The experiences of these new
service models are of interest to the Children’s services partnership in the use
of the WFWF and how partnership working can best support the intended
outcomes.  This offers an opportunity to ensure the maximum impact from
funding with similar aims to the planned IMP project. 
3.30 Lack of sustainable models identified from investigation of options in OBC –
as noted above, it has not been possible to identify a service model for across
Moray within an affordable financial envelope or to identify an ongoing source
of revenue funding to take forward any pilot. 
3.31 Taking all of this into account, it is proposed to:
• Continue to develop proposals to develop services to meet the
requirements for the WFWF and increasing SEF funding;
• Continue work to identify available resources that can be re-deployed to
support this project and ASN project aims; 
• Take forward the need to support the administrative elements of child’s
planning through the school business administration review; and
• Close the rest of the project. 
Page 164

Page 165

3.32 It is not therefore proposed to progress any of the options outlined in the
Business Case and Committee is asked to cease this project as part of the
Improvement and Modernisation Programme.  
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement 
Plan (LOIP)) 
The Improvement and Modernisation Programme is the development of
the commitment in the Corporate Plan to a programme of modernisation
and improvement to contribute to a financially stable Council. 
The report also relates to “Building a better future for our children and
young people in Moray” as part of the LOIP and the priority “provide a
sustainable education service aiming for excellence” as part of the
Corporate Plan. 
(b) Policy and Legal 
None. 
(c) Financial implications 
The recommendation not to proceed with any of the options outlined in
the Business Case is due to affordability and so there are no financial
implications if this is accepted.  
(d) Risk Implications 
The most significant risk arising from this report is that if no systems
wide improvement action is undertaken then there is a risk that well-
being outcomes for children could deteriorate. However as noted in the
report there are emerging funds and services that have similar
objectives.  Therefore, there will be ongoing work to develop services to
address these needs and mitigate the risks. 
It should be noted that to date the children’s services partnership have
struggled to resource the development work for the WFWF alongside
other priority work and so there is a risk of ongoing delay for this
development and use of the WFWF funding. 
(e) Staffing Implications 
There are no staffing implications directly arising from this report.   
(f) Property 
None 
(g) Equalities/Socio Economic Impact 
For the purposes of this report an Equality and a Socio Impact
Assessment is not required as no change is proposed. 
Page 165

Page 166

(h) Climate Change and Biodiversity Impacts 
There are no immediate climate change implications directly arising from
this report. 
(i) Consultations 
Head of Education (Chief Education Officer), Head of Finance, Quality 
Improvement Manager (East), Quality Improvement Manager (West),
Head of HR, ICT and Organisational Development, Acting Head of
Education Resources and Communities, a sample of primary head
teachers and Democratic Services Manager.  
5. CONCLUSION 
5.1 The original aim of this project was to promote and safeguard the health
and wellbeing of children to ensure that all children and their families
receive the right support at the right time. 
5.2 This aim continues to be relevant. However, due to the affordability gap
and the continued development of different approaches to delivering
positive wellbeing outcomes to children, none of the test of change
options identified as part of the Business Case are now considered to be
financially viable or sustainable. There are also opportunities to explore
other approaches developed by other local authorities and to consider
how the Whole Family Wellbeing Fund contributes to similar aims. 
5.3 It is therefore recommended that pastoral care ceases to be part of the
Improvement and Modernisation Programme and the approach to
supporting the delivery of wellbeing outcomes continues to be
developed within current resources. 
Author of Report:   Denise Whitworth/ Robin Paterson, Project Manager
(Education)  
Background Papers:   
Ref:  SPMAN-1468114179-65 / SPMAN-1468114179-61  
SPMAN-1468114179-64 / SPMAN-1468114179-62  
Page 166

Page 167

Appendix 1
Improvement and Modernisation Programme: Transformation to Achieve
EDUCATION IMPROVEMENT AND TRANSFORMATION 
The Council’s Corporate Plan sets a clear direction for providing a sustainable education
service aiming for excellence under the Our People priority: provide opportunities where
young people can achieve their potential to be the best they can be. 
It commits to improvement work focused on the areas of:
✓ Reducing the impact of poverty 
✓ Improvement in attainment, particularly literacy and numeracy
✓ Improvement in employability skills and sustained, positive school leaver
destinations for all 
✓ Reviewing and transforming the learning environment 
✓ Improvement in children and young people’s health and well-being
And indicates we will know we have made progress when: 
❖ The attainment gap between most and least disadvantaged children will
reduce
❖ Improved attainment at both the Broad General Education and Senior Phase
❖ Young people are better prepared for life beyond school and for the workplace
❖ A plan will be in place for an affordable, sustainable school estate 
❖ Improved outcomes for our most vulnerable young people and families 
This investment programme for Education has been developed to advance and
accelerate the priorities set out in the corporate plan supported by the strategic
education priorities of providing services that are fair, ambitious, improving and
responsive in line with Council’s values.  In particular the investment proposals
are targeted towards an overall strategic focus on improving attainment by:
➢ Early intervention and targeted resources to improve outcomes for all children, young
people and their families
➢ Providing and enabling a digital learning environment to improve equity and access
to curriculum
➢ Developing staff skills to improve learning and teaching, including digital
➢ Quality focus on improving learning and teaching
➢ Releasing and enabling leadership capacity
The Programme has been structured into 2 workstreams to reflect the main thematic areas
of work: Raising Attainment for All Learners and Raising Attainment - Curriculum breadth.
The table below summarises the Curriculum Breadth workstream
Item 10.*
Page 167

Page 168

Investment/New
Proposal 
Impact/Outcomes
Raising Attainment: Well-being Pastoral Care in
Primary: Improving Outcomes for Learners and
Early Years Intervention (All Groups)
Links to ASN and Raising
Attainment for All projects. 
Links to new Locality Management
operating model. 
• Increased attendance at
school for some children. 
• Reduction in exclusions. 
• Reduction in violence and
aggressive incidents. 
• Increased attainment and
achievement. 
Purpose  Promote and safeguard the
health and wellbeing and
safety of pupils in partnership
with parents, support staff and
partners to ensure all children,
young people and their
families receive the right
support at the right time no
matter the level of need. 
Key contribution to closing the
attainment gap by monitoring
attainment, attendance,
inclusion, participation and
engagement.
Release school leadership
time for strategic planning,
school improvement,
attainment and other
outcomes. 
Page 168

Page 169

APPENDIX 1A 
SEEMIS Report on Primary School Pupil and Child Plans (21 2 23) 
PRIMARY SCHOOL
School Roll (21-
02-2023)
No. of Child
Plans
% with a
Childs Plan
Aberlour Primary School                            109 15 13.8%
Alves Primary School                               79 7 8.9%
Anderson's Primary School                          246 7 2.8%
Applegrove Primary School                          297 35 11.8%
Bishopmill Primary School                          386 8 2.1%
Botriphnie Primary School                          18 0 0.0%
Burghead Primary School                            132 12 9.1%
Cluny Primary School                               323 12 3.7%
Craigellachie Primary School                       46 4 8.7%
Cullen Primary School                              101 6 5.9%
Dallas Primary School                              33 4 12.1%
Dyke Primary School                                83 16 19.3%
East End Primary School                            165 33 20.0%
Findochty Primary School                           59 10 16.9%
Glenlivet Primary School                           15 1 6.7%
Greenwards Primary School                          326 27 8.3%
Hopeman Primary School                             152 10 6.6%
Hythehill Primary School                           283 10 3.5%
Keith Primary School                               322 56 17.4%
Kinloss Primary School                             216 6 2.8%
Knockando Primary School                           43 4 9.3%
Lhanbryde Primary School                           168 30 17.9%
Linkwood Primary                                   307 40 13.0%
Logie Primary School                               37 1 2.7%
Millbank Primary School                            234 42 17.9%
Milne's Primary School                             199 14 7.0%
Mortlach Primary School                            131 10 7.6%
Mosstodloch Primary School                         180 6 3.3%
Mosstowie Primary School                           53 3 5.7%
New Elgin Primary School                           374 44 11.8%
Newmill Primary School                             66 3 4.5%
Pilmuir Primary School                             129 26 20.2%
Portessie Primary School                           113 7 6.2%
Portgordon Primary School                          48 3 6.3%
Portknockie Primary School                         65 0 0.0%
Rothes Primary School                              84 3 3.6%
Rothiemay Primary School                           58 2 3.4%
Seafield Primary School                            370 27 7.3%
St Gerardine Primary School                        297 8 2.7%
St Peter's RC Primary School                       112 11 9.8%
St Sylvester's RC Primary Schl                     114 5 4.4%
St Thomas' RC Primary School                       43 19 44.2%
Tomintoul Primary School                           31 2 6.5%
West End Primary School                            194 4 2.1%
TOTAL PRIMARY 6841 593 8.7% 
Item 10.*
Page 169

Page 170

Page 170

Page 171

1 
Appendix 1b
Well-being Outcomes for Primary School Children HT Questionnaire
1. Name of Primary School that responded to this Survey (10 responses)
Dyke Primary
Cullen Primary School
Knockando Primary School
West End
Aberlour Primary
St Gerardine
Millbank Primary School
Dallas Primary 
Logie Primary School
Tomintoul and Glenlivet
2. In total, how many child plans does your school currently hold for your pupils?        
SCHOOL PLANS      
Dyke Primary 9      
Cullen Primary School 9      
Knockando Primary School 4      
West End 12      
Aberlour Primary 16      
St Gerardine 14      
Millbank Primary School 50      
Item 10.*
Page 171

Page 172

2 
Dallas Primary  8      
Logie Primary School 3      
Tomintoul and Glenlivet 4       
3. Approximately and on average, how many Child Plans do you or your colleagues at your school complete each
month?
Answer
Choices Responses
0 - 5 70% 7
6 - 10 30% 3
11 - 15 0% 0
16 - 20 0% 0
21 - 25 0% 0
26 + 0% 0 
Answered 10 
4. Approximately and on average, how many hours a week, would you or your SLT colleagues collectively expect to
devote to undertaking child planning activities each week? 
Answer
Choices Responses
0 - 3 60% 6
4 - 6 10% 1
7 - 9 10% 1
10 - 12 0% 0
13 - 15 10% 1
16 - 18 10% 1
19 + 0% 0
Page 172

Page 173

3 
Answered 10 
5. Over the last 3 years, do you think the time taken to complete Child Plans has:- 
Answer Choices Responses
Decreased 0% 0
Remained the same 20% 2
Increased 80% 8
Please state the reason for the above answer (optional)  8 
Answered 10 
6. In order of preference (from 1 being your first choice to 5 being your least preferred choice), please rate / order the
following possible improvement options from 1 to 5. 
1 2 3 4 5 Total
A member of the SLT within your school with a dedicated remit for
Pastoral Care
0%  10%  10%  20%  60%  10
Additional Administration and Clerical Support to facilitate the Child
Planning Process (e.g. minute taking)
50%  30%  20%  0%  0%  10
More teaching staff to deliver pastoral care support 20%  20%  20%  10%  30%  10
More specialist support staff 20%  20%  20%  40%  0%  10
Review and Improvement of the Child Planning Process 10%  20%  30%  30%  10%  10
Page 173

Page 174

4 
7. If you wish provide any further information to support your preference choice? 
Primary School Response
Dyke Primary As a teaching Head with no SLT, child's planning can be very time consuming at certain points in the year
depending on need. Often what can be achieved from that time is very minimal as support services are not
accessible so an increase in school staffing to support initiatives and 1-1 work is the most sustainable option.
Cullen Primary
School 
Knockando
Primary School
In a small school with no SLT team, it would be helpful to have admin support to take minutes and to type up
plans. Also, clear guidance around the role of the Chair and the Scribe as I frequently take on both roles at
Child's Planning meetings. I think that other professionals attending the meeting such as Educational
Psychologists could help with those roles.
West End The time spent setting up meetings, sending out and chasing invites, conducting the meeting, taking the
minutes and then typing up the minutes, action plan and then getting them all sent out takes a lot of time.  I
have started using admin for some of the higher tariff meetings but that also adds to their work load.  CP
process needs clarity to who and when a CP needs to be opened.  Perhaps we do not need so many?
Aberlour
Primary
SFL teaching time is inadequate for the range of needs.  In secondary you have PT Guidance a similar role in
primary should be looked at.
St Gerardine 
Millbank
Primary School
The amount of admin time needed to plan for, minute and set up virtual links etc, needs to be taken into
consideration.
Dallas Primary  Managing CP process in a small school is challenging - mainly due to lack of ASN time and the teaching
commitment of HT. Between CPs and LPSs, too much time is required to ensure they are effectively managed
when there is a proportionately high level of need in the school.
Logie Primary
School 
Tomintoul and
Glenlivet
Ensuring that all partners involved with the child are represented at child plans meetings or submit a report. 
Page 174

Page 175

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 19 SEPTEMBER 2023 
SUBJECT: EARLY LEARNING AND CHILDCARE – FINANCIAL
SUSTAINABILITY 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the financial support including grants provided to
partner provider settings during the Early Learning and Childcare (ELC)
expansion period and throughout the COVID-19 pandemic and the ongoing
evaluation of the sustainable rate for ELC funded hours. 
1.2 This report is submitted to Committee in terms of Section III (D) (1) of the
Council's Scheme of Administration relating to all the functions of the Council
as an Education Authority. 
2. RECOMMENDATION 
2.1 It is recommended that Committee: 
i) consider and note the overall financial support provided to
partner provider settings during the ELC expansion period and
throughout the COVID-19 pandemic; 
ii) scrutinise and note the ongoing process to evaluate the
sustainable rate for ELC funded hours; 
iii) agree that no further uplift to the sustainable rate will be
considered during the 2023/24 financial year; and 
iv) agree that the sustainable rate will be reviewed for the 2024/25
financial year as part of the partner provider financial
sustainability review. 
3. BACKGROUND 
3.1 The ELC expansion project began in 2017 with the formation of a delivery
plan to increase funded ELC provision from 600 to 1140 hours per annum. 
Item 11.*
Page 175

Page 176

3.2 This project aimed to provide a quality ELC service that was both flexible and
accessible for parents and carers while ensuring childcare settings met an
agreed standard as outlined in the guidance issued by Scottish Government in
2018: Funding Follows the Child and the National Standard for Early Learning
and Childcare Providers: Principles and Practice. 
3.3 Additionally, the project’s objectives included maintaining an affordable
service to ensure a financially sustainable provision was in place that would
make the most effective use of public funds. 
3.4 Following the closure of the ELC expansion project in May 2022, further work
has progressed to bring the ELC budget in line as noted in the report
submitted to Education, Children’s and Leisure Services Committee on 19
April 2023 (para 23 of the minute refers) which outlined recommendations
from the external consultancy review of the ELC service and included a
financial sense check of the sustainable rate. 
3.5 As part of this continuing work, the ELC and Finance teams have been
reviewing the financial sustainability of the ELC service for partner provider
nurseries and childminders that are in partnership with the Council to provide
funded ELC hours. 
3.6 This includes reviewing the sustainable hourly rate which is currently £6.62 for
3-5 year olds and £7.95 for eligible 2 year olds. This rate includes the 5%
uplift that was agreed at a meeting of Moray Council on 2 February 2023
(para 24 of the minute refers). 
3.7 In addition to the sustainable hourly rate, partner providers receive Early
Intervention Funding (EIF) for those children who qualify for Additional
Support Needs (ASN) funds. This ASN funding ranges from £9.00 to £17.38
per hour of EIF allocation depending on the provider. Currently this funding
stream process and hourly rate is under review by Education and Finance
colleagues as part of the wider ASN evaluation. 
3.8 Funded meal payments are also made to partner settings which choose to
provide meals during funded sessions. The current rate is £2.35 per meal for
each day of attendance. Those settings which do not provide meals directly,
receive funded meals from the Council’s catering team. 
3.9 In evaluating the financial viability of the ELC provision, it is important to
consider not just the sustainable rate but also the overall support that has
been provided to partner provider settings from the start of the ELC expansion
project and throughout the COVID-19 pandemic period. 
3.10 Detailed financial support information can be found in Appendix 1 which
includes specifics on funded hour payments, a sustainable rate comparison
with other authorities, meal payments, milk and snack payments, grant
funding and additional support provided to partner provider nurseries and
childminders from 2017 to current. 
3.11 A significant amount of grant funding was available for partner provider
settings from the start of the ELC expansion programme throughout the
Page 176

Page 177

pandemic period from both the Scottish Government and the Council totalling
just under £1 million. 
3.12 In addition to the grant funding opportunities, the Council also provided
financial support to partner settings to aid with additional costs associated with
COVID-19 totalling just under £600,000. 
3.13 Ongoing work continues to progress with partner providers operating from
Council owned premises to establish lease agreements which will take into
account issues highlighted in the Subsidy Control Act by ensuring an
equitable approach to rent and shared property costs for those providers
operating from both Council and non-Council facilities. 
3.14 Further to monetary funding, central ELC team support extends to areas not
typically considered in terms of financial sustainability although it is an
important aspect in ensuring a high quality ELC service is maintained. 
3.15 This includes continuous professional development (CPD) training
opportunities and support from central ELC team members: Continuous
Improvement Officers (CIOs), Childminding Development Officer (CDO), Early
Intervention (EI) Teachers, Teaching and Learning (T&L) Teachers, Equity
and Excellence Lead (EEL) Practitioners and the Early Years’ Service
Manager. 
3.16 A recent publication from the Scottish Government issued on 31 July 2023,
Financial Sustainability Health Check of the Childcare Sector in Scotland and
the supporting Analysis and Evidence paper, highlights evidence collected on
the sustainability of the childcare sector and takes into account the impacts of
the costs crisis, workforce pressures and the lasting impacts of the pandemic. 
3.17 While authorities across Scotland have requested that the Scottish
Government outline a standard approach to setting the sustainable rate, it has
so far been left to local authorities to determine individual methodologies for
these rates. As a result, there are now 32 different approaches which could
contribute to local conflict with partner providers. 
3.18 A further publication of the joint Scottish Government and COSLA Review of
the approach to setting sustainable rates in 2022-23 is expected later this year
which will highlight input from both partner providers and local authorities. This
will be useful to inform the future review of our local rates for the 2024/25
financial year and onwards. 
3.19 The findings from this review will inform what further action may be required in
regards to a wider approach for setting the sustainable rate over the rest of
this Parliament. 
3.20 The sustainable hourly rate in Moray continues to be one of the highest rates
in Scotland since the 5% uplift went into effect; however, partner providers
report that this rate does not reflect up-to-date costs caused by inflation and
Real Living Wage increases. 
Page 177

Page 178

3.21 Further review of partner provider costs with support from Finance is required
in order to determine the financial sustainability of providers in Moray. This
may include exercises to audit accounts, review financial statements and on-
going costs of providers in order to determine why providers in comparable
authorities are able to operate with lower hourly rates. 
3.22 If following this review the evidence gathered indicates an uplift to the
sustainable rate is merited for the 2024/25 financial year, an additional report
will be brought to this Committee to highlight what funding would be required. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The report links to the priority of working towards a financially stable
Council that provides valued services to our Communities and providing
a sustainable education service aiming for excellence as referred to in
the Moray Council Corporate Plan. 
The report links to ‘Building a better future for our children and young
people in Moray’ from the LOIP. 
(b) Policy and Legal
There are no policy or legal implications arising directly from this report;
however, it is important to note that the contract agreement between
Moray Council and partner providers highlights the following points
regarding the sustainable rate: 
• inflationary and Real Living Wage increases will be reviewed on
an annual basis;
• the extent to which any inflationary and Real Living Wage
changes are reflected in the price for future years of the contract
is subject to the overall level of funding agreed between Scottish
Government and local government for the expanded ELC hours;
• in relation to the sustainable rate setting process, the Council will
take into consideration statutory and non-statutory Guidance
including as published by Scottish Government and COSLA;
• the Council may, as a result of the sustainable rate setting
process, elect to amend the price during the period of contract
and shall be the sole judge of whether the price is amended and
is under no obligation to implement any price amendment at any
stage;
• the process for setting the price will be conducted in line with
Funding Follows the Child and the National Standard for Early
Learning and Childcare Providers: Guidance for Setting
Sustainable Rates from August 2020; and 
• the yearly sustainable rate and daily lunch rate will be determined
annually by the Council. 
The full contract agreement can be viewed on the Public Contracts
Scotland site. 
Page 178

Page 179

(c) Financial implications
There are no financial implications directly arising from this report;
however, the following information is important to note. 
The 2023/24 financial year budget required to pay the ELC hours
delivered by partner providers is £8.2 million with the total funding from
Scottish Government being £9.167 million. This funding is earmarked for
the operation of the entire ELC service provision in Moray including both
local authority and partner provider service provision. This highlights that
close to 90% of Scottish Government funding for the 1140 hours of ELC
provision goes towards partner provider payments. The remainder of the
funding from Scottish Government along with the agreed Council budget
for ELC is used to maintain the local authority ELC provision. Any further
uplift in the sustainable rate would increase the cost of provision and
would require additional budget commitments from the Council. 
The Council is projecting a required savings of around £20 million across
the next 2 financial years. In these circumstances all costs incurred by
the Council must be subject to rigorous scrutiny. 
(d) Risk Implications
There are two inherent risks when considering the sustainable hourly
rate:
• If the rate is set too low, there is a risk that providers would not be
able to remain financially viable. Should this be the case then
some providers may seek to alter their service offer to manage
business costs.
• If the rate is set too high, there is a risk that this would not be
sustainable for the Council to maintain. 
The process for setting the hourly rate aims to allow both factors to be
balanced; however, there is a risk to the reputation of the Council as an
accredited Real Living Wage (RLW) employer if the sustainable rate is
set too low for providers to continue paying the RLW. 
Additionally, there is a risk that the working relationship with partner
providers is impacted due to requests made around finances, sharing of
accounts and a moderate uplift in the sustainable rate approved by
Moray Council in February 2023. 
(e) Staffing Implications
There are no staffing implications arising directly from this report. 
(f) Property
There are no property implications arising directly from this report. 
(g) Equalities/Socio Economic Impact
There is no requirement for an equality impact or socio economic impact
assessment to be carried out as a result of this report. 
(h) Climate Change and Biodiversity Impacts
Page 179

Page 180

There are no climate change or biodiversity implications arising directly
from this report. 
(i) Consultations
Depute Chief Executive (Education, Communities and Organisational
Development), Head of Education (Chief Education Officer), Head of
Governance, Strategy and Performance, Chief Financial Officer, Early
Years Service Manager, Nicky Gosling, Accountant and the Democratic
Services Manager have been consulted. 
5. CONCLUSION 
5.1 Committee is asked to consider and note the overall financial support
provided to partner provider settings during the ELC expansion period
and throughout the COVID-19 pandemic. 
5.2 Committee is asked to consider and scrutinise the ongoing process to
evaluate the sustainable rate for ELC funded hours. 
5.3 Committee is asked to agree that no uplift to the sustainable rate will be
considered for 23/24 and that the review of partner financial
sustainability once completed is taken into account in the review of the
rates for 2024/25 onwards in order to enable forward planning by both
the council and partner providers. 
Author of Report: Hazel Sly, Early Years Service Manager and Jennie
Ordonez, Early Years Project Officer 
Background Papers: SPMAN-1315769894-39 / SPMAN-1315769894-346 /
SPMAN-1315769894-353 / SPMAN-1315769894-360 /
SPMAN-1315769894-391
Ref: SPMAN-1315769894-422 / SPMAN-1315769894-423 
Page 180

Page 181

ELC Financial Sustainability Report Appendix 1
Grant Funding throughout ELC expansion and COVID-19 pandemic for Private, Voluntary or Independent (PVI) Nurseries and Childminders
Grant Name Grant Sponsor Year(s)
Total PVI or
Partner Provider
Applications
Approved
Total Amounts
Approved Comments
Getting Ready for 2020
Major Infrastructure - for
partner nurseries and
partner childminders Moray Council
2017/2018
2018/2019
2019/2020
52 £441,653.56
this grant was available to partner nurseries and partner
childminders who could apply during each grant period
Getting Ready for 2020
Training Grant - for partner
nurseries and partner
childminders Moray Council
2017/2018
2018/2019
2019/2020
14 £35,439.60
this grant was available to partner nurseries and partner
childminders who could apply during each grant period
Outdoor Resources Grant
for partner nurseries and
partner childminders Moray Council Jul/Aug 2020 57 £21,734.43
this grant was also available for Local Authority (LA) nursery
settings - 21 additional LA settings requested resources totalling
a further £10,114.63
Transitional Support Fund -
for PVI nurseries only
Scottish
Government Sept/Oct 2020 39 £202,750.00
this grant was available for any PVI nursery setting regardless of
partnership status with Moray Council -- of those applications
submitted only 1 was from a non-partner setting
Temporary Restrictions
Fund Round 1 -for PVI
nurseries and for PVI
childminders with capacity
of 12 or more children
Scottish
Government Jan-2021 29 £51,137.50
this grant was available for any PVI nursery or childminder
setting regardless of partnership status with Moray Council -- of
those applications submitted only 1 was from a non-partner
setting
Temporary Restrictions
Fund Round 2 - for PVI
nurseries and for PVI
childminders with capacity
of 12 or more children
Scottish
Government Feb-2021 37 £81,272.50
this grant was available for any PVI nursery or childminder
setting regardless of partnership status with Moray Council -- of
those applications submitted only 2 were from non-partner
settings
Item 11.*
Page 181

Page 182

Temporary Restrictions
Fund Round 3 - for PVI
nurseries and for PVI
childminders with capacity
of 12 or more children
Scottish
Government Mar-2021 7 £23,988.00
this grant was available for any PVI nursery or childminder
setting regardless of partnership status with Moray Council -- of
those applications submitted only 2 were from non-partner
settings
Omicron Fund - for PVI
nurseries and for PVI
childminders with capacity
of 12 or more children
Scottish
Government Mar-2022 37 £113,250.00
this grant was available for any PVI nursery or childminder
setting regardless of partnership status with Moray Council -- of
those applications submitted only 1 was from a non-partner
setting
Total Grant Funding Approved: £971,225.59
Page 182

Page 183

ELC Financial Sustainability Report Appendix 1
COVID 19 Additional Support -- paid to partner providers throughout pandemic period
Category
Total amount
provided
Cleaning costs £432,950.00
Additional COVID
related costs/Hub
payments £128,158.86
Total Additional
COVID-19 Support
Provided: £561,108.86
Comments
Payments of £400 were made monthly to partner providers nurseries and
£150 to partner childminders from August 2020 - June 2022 to cover costs
associated with enhanced cleaning procedures due to COVID-19
These costs included HUB payments, catering costs for HUB settings, self-
assessment costs, miscellaneous costs associated with COVID-19 (i.e.
legionella testing, PPE etc.)and financial sustainability payments for those
settings which required further, individual support
*In addition to the support noted above, funded hour payments continued to be made to nurseries and childminders unable to operate due to COVID-19
restrictions throughout the pandemic. Furthermore, from March 2020 to July 2020 and January 2021 to February 2021, payments were rounded up to the
nearest £1,000 for partner nurseries and the nearest £100 for partner childminders to provide further financial support to these settings. (i.e. during the noted
time periods, if the payment would normally have been £250, a partner nursery would then have received £1,000 and a partner childminder would have received
£300)
Page 183

Page 184

ELC Financial Sustainability Report Appendix 1
Funded Hours, Meals and Snack Payments for Partner Nurseries and Childminders
Category
Total amount
paid 2017/2018
Total amount
paid 2018/2019
Total amount
paid 2019/2020
Total amount
paid 2020/2021
Total amount
paid 2021/2022
Total amount
paid 2022/2023 Comments
Funded hour
payments £2,358,831.16 £2,801,057.53 £3,964,925.65 £6,210,661.88 £7,165,149.74 £8,189,698.65
Funded meal
payments £0.00 £16,189.70 £57,056.78 £143,002.88 £190,509.09 £189,392.00
Funded meal payments began
2018/2019 and are made in
addition to the funded hourly
payment to those partner settings
which choose to supply meals
themselves - payments begin each
year in August - July of the
following year and are paid on the
basis of one funded meal per day
of attendance
Scottish Milk &
Healthy Snack
payments £0.00 £0.00 £0.00 £0.00 £83,432.33 £178,174.46
These payments funded by Scottish
Government began in 2021/2022
and are facilitated by each Local
Authority - payments begin each
year in August - July of the
following year for any Early Years
provider registered with Care
Inspectorate who has opted in to
the programme regardless of
partnership status
Year Funded meal rate
Funded snack &
milk rate
2017/2018 n/a n/a
2018/2019 £2.30 n/a
2019/2020 £2.30 n/a
2020/2021 £2.30 n/a
2021/2022 £2.35 40p
2022/2023 £2.35 58.2p
£5.31 for 3-5s and £6.00 for 2s
£6.30 for 3-5s and £7.57 for 2s
£6.62 for 3-5s and £7.95 for 2s
Moray Council funded hourly rate
£3.45 for 3-5s and £5.46 for 2s
£4.00 for 3-5s up to 600 hours;
£4.50 for 3-5s over 600 hours and
£5.60 for 2s
£5.00 for 3-5s and £5.85 for 2s
Page 184

Page 185

ELC Financial Sustainability Report Appendix 1
2021-2022 and 2022-2023 – Sustainable Rate Comparison
Northern Alliance Authorities:
Local Authority Meals rate 22/23
Aberdeen City £6.05 £5.45 £6.15 £5.55 £2.75
Aberdeenshire £6.34 £5.59 £6.61 £5.83 £2.50
Argyll & Bute £6.54 £5.78
£7.18 if PVI evidence payment
of Real Living Wage (RLW)
otherwise rate is £6.90
£6.35 if PVI evidence payment
of Real Living Wage (RLW)
otherwise rate is £6.11
£3.11
Highland £6.13 £5.43 £6.61
£5.75 until April 2023; beyond
April 2023 rates are subject to
review
£3.00
Moray £7.57 £6.30 £7.95 £6.62 £2.35
Orkney £6.00 (only for childminders as
no PVI nurseries)
£5.00 (only for childminders as
no PVI nurseries)
£6.00 (only for childminders as
no PVI nurseries)
£5.00 (only for childminders as
no PIV nurseries) £2.40
Shetland
£6.70 & £7.13 (higher rate is
for nurseries not eligible for
Building Support Package)
£5.16 & £5.48 (higher rate is
for nurseries not eligible for
Building Support Package)
£7.30 & £7.77 (higher rate is
for nurseries not eligible for
Building Support Package)
£5.62 & £5.97 (higher rate is
for nurseries not eligible for
Building Support Package)
£1.99
Western Isles £5.31 £5.31 £5.75 £5.55 £2.00
Comparator Authorities:
Authority Meals rate 22/23
Angus £6.68 £5.21 £7.18 £5.61 £3.00
East Lothian £5.31 £5.31 £7.55 £6.04 35p top up of
hourly rate
Midlothian £6.50 £5.31 £6.50 £6.02 40p top up of
hourly rate
Scottish Borders £5.65 £5.31 £6.55 £6.21 £2.40
Stirling
£5.20 (childminder rate only as
no 2's placed with PVIs in
2021/22)
£5.55 £6.51 £5.70 35p top up of
hourly rate
West Lothian £6.40 for nurseries /
childminder rate £5.90
£6.40 for nurseries /
childminder rate £5.90
£6.40 for nurseries /
childminder rate £5.90
£6.40 for nurseries /
childminder rate £5.90
30p top up of
hourly rate
Rates 2 year olds & 3-5  year olds 2021/2022 Rates 2 year olds & 3-5  year olds 2022/2023
Rates 2 year olds & 3-5  year olds 2021/2022 Rates 2 year olds & 3-5  year olds 2022/2023
Page 185

Page 186

Page 186

Page 187

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 19 SEPTEMBER 2023 
SUBJECT: SPEECH AND LANGUAGE CONTRACT AND SUPPORT
(EDUCATION) 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the status of the service delivery of the Speech
and Language Contract (SALT) for children and young people with complex
needs who require specialist input and the proposed changes to address the
impact thereof. 
1.2 This report is submitted to Committee in terms of Section III (D) (1) of the
Council's Scheme of Administration relating to all the functions of the Council
as an Education Authority. 
2. RECOMMENDATION 
2.1 It is recommended that Committee: 
i)  consider and note the historic support from SALT for Children
and Young People with complex needs across Moray; 
ii)  consider and note the previous spend allocation for SALT for
Children and Young People; 
iii)  consider and agree the proposed reallocation of current budget
for Children and Young People with complex communication
needs across Moray; 
iv) agree the proposed approach for the communication needs of
Children and Young People with complex needs across Moray;
and 
v)  agree as part of the proposed approach for the communication
needs of Children and Young People with complex needs across
Moray the underspent budget is allocated to recruit Pupil Support
Worker (PSW) 
Item 12.*
Page 187

Page 188

3. BACKGROUND 
Contract background
3.1  As requested at ECLS committee on 19 April 2023 (para 10 of the minute
refers) this paper details the Speech and Language contract and how the
contract document and related support has evolved. 
3.2  Across Moray the NHS Speech and Language Service (SALT) have a
paediatric team who meet the needs of children and young people outlined in
their staged intervention.  This report pertains to the commissioned service
contract to deliver communication support for children and young people with
complex needs. The contract is specifically for these children and young
people many of whom have lifelong conditions affecting communication and
who are non-verbal. 
3.3  Currently, the number of young people who are non-verbal with complex
needs in Moray sits at 35. The majority attend enhanced provisions in Primary
and Secondary schools across Moray, within in their own ASG. Two attend
their local primary school and there are an additional 15 who are currently in
ELC settings. 
3.4  Children and Young people in Moray who have complex additional support
needs which affect their communication, require specialist input from the
Speech and Language Service. This provision is in addition to the service
which is delivered by the paediatric team Speech and Language and is
available within  Universal service provision and stages 1 and  2 intervention
support services (see table below). This support is accessed by parents,
carers and educational settings through referral by the Team Around the
Child/Child planning processes. 
Universal Stage 1 Stage 2
Universal (=Level 1) support ensures
all children have appropriate language
and communication opportunities. We
want to provide information and
guidance to families, and those
working with children and young
people about how to identify and
support SLCN. 
Targeted (=Level 2) support offers
help for children and young people
who are felt to be vulnerable in
relation to speech, language and
communication. It includes training
for interventions such as Talk
Boost as well as coaching for
parents and staff around
evidence-based interventions. 
Stage 3 
Specialist support provides intervention for children and young people
whose needs cannot be fully met through provision from universal or
targeted offers. It will aim to ensure joint working with the multi-disciplinary
team and parents.  
3.5  As part of the Additional Support for Learning Act (2009) local authorities are
required to make provision for children and young people with complex
communication needs as outlined in their Co-ordinated Support Plans (CSPs.)
Page 188

Page 189

Most local authorities commission this service from NHS Speech and
Language Paediatric Service. 
3.6  The service commissioned by the contract in Moray provides targeted support
(as defined within the Moray Council Staged Intervention model) to children
and young people with severe and complex communication needs (aged 2-
18). These needs may be due to a number of difficulties or conditions: 
Dysphagia, Swallowing and Feeding Difficulties
Complex Needs and Disabilities (mainly comprising of children with
Exceptional Support Needs)
Neurological Conditions 
Hearing Impairment 
Severe Social Communication Needs, including Autism and Autistic Spectrum
Conditions 
Augmentative and Alternative Communication Needs 
3.7  Since 2011 the Council has had a contract with NHS Speech and Language
Paediatric team to deliver support to children and young people identified as
having complex needs affecting communication, most of whom access
enhanced provision or ELC specialist settings and who are non-verbal. 
3.8  In 2020 the contract was renewed for a further 3 years and there were specific
actions regarding how support was provided and how this would be measured
to address some of the concerns about staff confidence and levels of
implementation and sustainability. The concerns which had been identified
were the level of impact of the visits by speech and language therapists.
Practice by staff working within enhanced provisions was not consistent in
implementation and some practice was weak due to level of staff confidence,
experience and knowledge. 
3.9  The service delivery included direct input with children and young people,
training, assessment and written programmes. These were all delivered under
the direction of specialist SALT personnel and access to provision of low and
high technical resources to support communication was provided. There were
two level 7 SALT specialists who each covered an area (East and West).
Visits were regular to all provisions with coaching and input to programmes as
part of the contract. 
3.10  The contract outcomes are summarised below. 
Outcomes as per contract 20-23
Outcome 1
Joint working to identify communication needs and supports
Outcome 2 
Children and young people achieve their educational objectives 
Outcome 3 
Children and young people are identified as early as possible with early
interventions 
Outcome 4
Review of support 
Outcome 5 
Page 189

Page 190

SLT resources are directed to greatest impact 
3.11    In 2020 staffing to deliver the contract was costed and agreed at 
£200,208. 
3.12    Communication is key to supporting the development of children in order that
they can access learning through Foundation Milestones and pre-early literacy
and numeracy as well as supporting communication which is vital for their
wellbeing. The contract outcomes were developed to ensure that both
receptive (understanding what is being communicated) and expressive (can
be understood by those they are communicating with) communication, was in
place for all our complex needs children. It was important that training was
supported by modelling and coaching to embed the approaches for each
child. A pilot was undertaken at the start of the 3 year contract 2020-23 where
two settings (Seafield Nursery and Primary, Elgin) were selected to undertake
training, coaching and modelling by SALT. 
3.13   In this pilot the SALT team worked alongside enhanced provision and nursery
staff to create a communication pathway for all identified children and
supported the implementation with training related to the strategies required.
They also coached and modelled techniques to further develop the skills and
confidence of the staff. The pilot was evaluated and the impact was evidenced
as effective both in developing communication skills for our young people and
also embedding practice and consistency. Parents reported impact at home
and worked with staff to adopt some of the strategies at home. Key learning
was identified with regard to ensuring staff availability and building in planning
time. The intention had been to roll out across the provisions over a two year
period but this was interrupted by the staffing crisis within the SALT service. 
3.14    Since April 2021 the SALT service delivery has been affected by significant
staff shortages with difficulties to recruit alongside maternity cover not being
filled. It was agreed that the contract payments would be reduced to £81,059
with reduce costs  noted in the budget monitoring report to the ECLS
Committee on 19 April 2023 (para 10 of the minute refers)  . The input was
revised to focus on Coordinated Support Plans (CSP) as these related to the
children with the highest level of need and provided the support for the
educational objectives within the plans. It is a legislative requirement that if a
young person requires significant support for communication from SALT then
this is provided via CSP. 
3.15   In June 2022 when the service was further depleted to a level of 50% capacity
in the paediatric team, the providers (NHS SALT) withdrew from the contract
delivery until such times as they had capacity to re-engage. The paediatric
team of Speech and Language therapists continued to support and respond to
requests for advice and in some cases input with specific cases. The SALT
service also provided an enquiry line for parents and all educational settings
which was open twice a week and staffed by a therapist. 
3.16    During 2022-2023, the CSPs were reviewed with limited input from SALT.
Settings were able to use their experience and knowledge to agree strategies
and next steps and, high need cases where support was required, received
visits from the SALT team.
Page 190

Page 191

3.17   Staff were able to refer to the CALL Centre for guidance and training and to
access on line signing and use of visual resources from providers. The CALL
Centre is government funded to support all local authorities. The CALL centre
is a resource for all practitioners where knowledge and experience can be
increased and consultation and support accessed. 
3.18   The impact of these changes to the contract included: 
Outcomes as per
contract 20-23
Current delivery Impact
Outcome 1
Joint working to
identify
communication
needs and supports
Joint working limited and on
request using dedicated help
line staffed by SALT 
Reliance on knowledge and
experience of ASN staff-some
staff sought support from peers
Inconsistent practice
Confidence on moving
forward with progression
was dependent on level
of experience 
Outcome 2 
Children and young
people achieve their
educational
objectives 
Education staff sourced
training for Makaton and Talk
boost and followed previously
identified programmes 
Most objectives were
partially or fully met but
staff reported a clear
need for support to
develop the next steps 
Outcome 3 
Children and young
people are identified
as early as possible
with early
interventions 
ELC teaching team provided
training to settings and
supported communication 
Early intervention for
some children and staff
benefited from
awareness raising but
collaborative
assessment with the
SALT team and the
settings are required 
Outcome 4
Review of support 
Undertaken 2020-21
Specific concerns identified
regarding Augmentative and
Alternative Communication
(AAC) roll out and halting of
the pilot model of coaching and
mentoring 
Overview of
communication supports
evidenced a limited
range of AAC and a lack
of specific detail relating
to strategies for our
young people in some
settings 
Outcome 5 
SLT resources are
directed to greatest
impact 
Reduced capacity and then
suspension 
Without training and
development within
settings individuals
needs not fully met 
3.19 Outcome 4 refers to AAC- Augmentative and Alternative Communication
(AAC) is a range of strategies and tools to help people who struggle with
speech. These may be simple letter or picture boards or sophisticated
computer-based systems. AAC helps someone to communicate as effectively
as possible, in as many situations as possible. 
Page 191

Page 192

4. SALT REVISED DELIVERY PLAN 
4.1 In May 2023 the NHS SALT managers reported a readiness to consider
reinstating the contract with a phased input matched to their capacity.
Children and young people requiring specialist provision were identified using
a scoping exercise looking at communication and current approaches. 
4.2 It was agreed that the most effective model to build capacity and impact, is to
continue with the SALT coaching model. This embeds the identified methods
to enable educational objectives to be achieved and for young people to be
heard and understood. The coaching from Speech and Language specialists
working alongside staff in our education settings enables skills to be
developed and adjustments of approaches to be made on site as they arise.
Training is targeted to match staff development needs and the needs of the
young people. Parents and carers are able to be supported in transferring
approaches to their home setting. 
4.3 In the first term the proposal prioritises the young people who meet the criteria
for CSPs and specifically young people who are currently due for a review and
an interim review where specific concerns and needs have arisen. 
4.4 In the subsequent schools terms (2023-2024), the capacity of the SALT team
will have increased and input will extend to targeting identified settings where
staff training and coaching is a priority. These settings will have significant
support to review, assess and deliver communication action plans to their
cohort. This will build capacity and confidence in these settings where the
needs are identified from the scoping as being the highest needs. 
4.5 An area of urgent development is the requirement for embedding of AAC
resources for some of our young people and specific input to build overall
capacity and sustainability.  The initial scoping exercise highlighted a specific
issue regarding AAC and the supports in place relating to high end technology
and use of digital supports. There are two types of communication supports
referred to as AAC Low tech symbols, signing and high tech using software
and digital supports. Some parents and carers had contacted organisations
and charities to enlist their help to assess and identify potential enabling
software and digital supports which they had researched and are keen to have
in place for their child. There is a risk of referral to ASN Tribunal unless we
address this gap in provision.  This is addressed through the re-activation of
the service as noted below in this report. 
4.6 The CALL Centre Edinburgh is a national service open to all authorities either
through service agreement or on a case by case basis. This service would
enable some of the unmet needs regarding AAC to be addressed and would
build capacity and sustainability into our planned service delivery to meet
complex needs in our settings. 
4.7 It is proposed to seek a 20 day contract, with CALL, per year for the next two
years at a cost of £15,000 per year where two specialists and a speech and
language therapist can work with identified schools to support development of
skills relating to AAC.CALL provide generic training and on line webinar and
Page 192

Page 193

courses. The provision would be for  1 week blocks each term to target urgent
unmet needs where assessments, equipment loans and training is provided
as well as advice and support for the programmes provided. The costs include
estimates for accommodation and travel as the service provider is based in
Edinburgh. This would enable the risk of referral to Tribunal due to unmet
need to be addressed, which could otherwise be more difficult to defend if of
the type relating to AAC using technology. 
4.8 AAC at both high and low tech require skills in technology and inputting to
software for individual needs as well as updating as communication develops. 
A PSW post similar to those in place in our sensory service is required. This
post would support the preparation of resources in settings across Moray to
ensure the programmes are fully in place and resourced following input from
SALT and CALL. This would be an essential component of the strategy to
ensure all our young people have a secure communication pathway tool which
enables their voices to be heard and for them to understand those who are
teaching and supporting their development. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The report links to ‘Building a better future for our children and young
people in Moray’ from the LOIP. 
(b) Policy and Legal
Failure to comply with meeting the communication needs of our children
and young people could lead to a rise in referrals to Tribunal Add link 
(c) Financial implications 
Year 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26
Spend
SALT
£200,000 £81,059 £40,000  £ 33,497 £77,476 £77,476
Proposed 
Spend
providers
none none None CALL
£15,000
BoardMak
er £12 000 
CALL
£15,000
BoardMak
er £12 000
PSW
CALL
£15,000
BoardMaker
£12 000 
PSW
Pupil
Support
Worker post   
£15,000
(approx) 
£30,000
(approx) 
Total spend/
projected
spend
£200,000 £80,000 £40,000 £75,497 £134,376 £104,376
Available
Budget
£200,000 £200,000 £200,000 £ 140,000 £140,000 £140,000 
Page 193

Page 194

(d) Risk Implications
There is evidence that there is a potential impact regarding the ongoing
absence of the contract and service. Without the input from SALT the
progress of communication skills for our non-verbal children and young
people is at risk. Some strategies and approaches for non-verbal young
people are not consistently deployed by Moray Education staff within the
Enhanced Provisions. Parents and carers have expressed concerns
about the absence of input and guidance from the SALT team for their
needs at home. Specific concerns relating to AAC have been raised. It
should be noted that failing to deliver the coordinated support plan
education objectives could result in reference to the ASN Tribunal.
By developing a resource from two sources SALT & CALL there will be
access to AAC to support assessed communication needs. Together
with provision of coaching and training we will mitigate the identified risk
of being unable to deliver our legislative requirements and will be
meeting the needs of our most vulnerable young people.   
(e) Staffing Implications
It is proposed to allocate budget to create a post of Pupil Support Worker
to support the preparation of resources in settings across Moray to
ensure the programmes are fully in place and resourced following input
from SALT and CALL as outlined in the report above.  The cost of this
post is approximately £30k including oncosts and will be met within the
current budget. 
(f) Property
There are no property implications arising directly from this report. 
(g) Equalities/Socio Economic Impact
An EIA was completed when the contract was reduced in April 2023. 
(h) Climate Change and Biodiversity Impacts
There are no climate change or biodiversity implications arising directly
from this report. 
(i) Consultations
Depute Chief Executive (Education, Communities and Organisational
Development), Head of Education (Chief Education Officer), Early Years
Service Manager, Nicky Gosling, Accountant, Quality Improvement
Officer (ASN) and the Democratic Services Manager have been
consulted. 
5. CONCLUSION 
5.1 Committee is asked to note the historical background to the service and
the challenges in securing delivery and to agree the proposed approach
for the communication needs of Children and Young People with
complex needs across Moray as set out in the report. 
Page 194

Page 195

Author of Report: Hazel Sly, Early Years Service Manager and Sarah
Marshall, Additional Support Needs Education Support
Officer
Background Papers: 
Ref: 
Page 195

Page 196

Page 196

Page 197

REPORT TO:   EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 19 SEPTEMBER 2023   
SUBJECT: EDUCATION RESOURCES AND COMMUNITIES REVENUE
BUDGET MONITORING TO 30 JUNE 2023 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the budget position for Education Resources and
Communities as at 30 June 2023. 
1.2 This report is submitted to Committee in terms of Section III (A) (2) of the
Council’s Scheme of Administration relating to the consideration of capital and
revenue budgets and long term financial plans. 
2. RECOMMENDATION 
2.1 It is recommended that Committee scrutinises and notes the budget
position at 30 June 2023. 
3. BACKGROUND 
3.1 The report highlights those areas of the budget where there is a significant
percentage variance identified 30 June 2023. 
4. BUDGET POSITION 
4.1 The spend at 30 June 2023 is £3,943,000 against a budget to date of
£4,026,000, giving an underspend of £83,000 as shown in Appendix 1.  
4.2 The Covid-19 pandemic had a significant impact on income and a £500,000
reduction in the income budget for leisure facilities was approved as part of
the budget report to Moray Council 3 March 2021 (para 5 of the minute
refers). The income budget has been partially increased in 2023/24 and
proposed to be back to pre-pandemic levels in 2024/25. Income is currently
£100,000 ahead of target in quarter 1 and the budget will be adjusted to
reflect this. 
Item 13.*
Page 197

Page 198

4.3 There is an overspend on library service licences of £25,000. The service has
reviewed all licences and the costs will be reduced in 2024/25 bringing them
back in budget. Other minor over/underspends make up the difference. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement 
Plan (LOIP) 
The Education Resources and Communities Revenue Budget has 
particular reference to National Outcome 8 – we have improved the life 
chances for children, young people and families at risk. 
(b)  Policy and Legal
The Council has statutory responsibilities to meet educational
needs, the needs of children and young people in need and those it
looks after. 
(c)  Financial implications
The resource implications are set out in this report and at Appendix 1.
The underspend as at 30 June 2023 is £83,000 against a budget to
date of £4,026,000. 
(d)  Risk implications
Budget Managers are aware of their responsibilities for managing
budget allocations and approval for any variances will be sought from
Committee in line with the Financial Regulations 
(e)  Staffing implications
There are no staffing implications associated with this report. 
(f)  Property
There are no property implications associated with this report. 
(g)  Equalities/Socio Economic Impact
An Equality Impact Assessment is not needed because the report is to
inform the Committee on budget monitoring. 
(h)  Climate Change and Biodiversity Impacts
No climate change and biodiversity impacts arise directly from this
report. 
(i) Consultations
The Chief Financial Officer and Democratic Services Manager, have
been consulted and are in agreement with the contents of this report
where it relates to their areas of responsibility. 
6. CONCLUSION 
6.1 That Committee scrutinises and notes the budget position as at 30 June
2023. 
Page 198

Page 199

Author of Report: Andy Hall, Acting Head of Education Resources and
Communities 
Nicky Gosling, Accountant 
Background Papers: with authors 
Ref:    SPMAN-9425411-270 / SPMAN-9425411-271 
Page 199

Page 200

Page 200

Page 201

Education Resources & Communities Appendix 1
Budget Monitoring Report to 30 June 2023
Service
Revised
Budget 
Budget
to Date 
Actual to
Date 
Variance to
Date  Variance
£'000  £'000  £'000  £'000 %
Communities 1,345 333 324 9 3 %
Culture, Sport & Leisure 4,607 1,085 1,008 77 7 %
Learning Estate 363 76 72 4 5 %
Business Support Unit 1,731 420 417 3 1 %
Education Resources & Communities Management 100 22 22 - -
Public Private Partnership 6,152 2,090 2,100 (10) -
Education Resources & Communities Efficiency
Savings (628) - - - -
-
Education Resources &
Communities Total 13,670 4,026 3,943 83 -
Item 13.*
Page 201

Page 202

Page 202

Page 203

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE 19 SEPTEMBER 2023 
SUBJECT: LEARNING ESTATE  STRATEGY AND DELIVERY PROGRAMME
UPDATE – FUTURE FORRES ACADEMY AND BUCKIE HIGH
SCHOOL 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee on the status of the Learning Estate Investment
Programme (LEIP) Phase 3 project funding bids for Future Forres Academy
and Future Buckie High School and to seek budget approval for proposals
(Appendix 1 and Appendix 2) to engage external consultancy from Hub
North Scotland Limited (HNSL) to undertake feasibility studies and outline
business case development. 
1.2 This report is submitted to Committee in terms of Section III (D) (17) of the
Council's Scheme of Administration relating to the School Estate to consider
and make recommendations on capital and minor works programmes within
the remit of the committee. 
2. RECOMMENDATION 
2.1  It is recommended that Committee: 
i) Notes that while Council awaits an investment decision in terms
of the Scottish Government’s Learning Estate Investment
Programme (LEIP) Phase 3, Officers seek to progress work on
Future Forres Academy and Future Buckie High School projects; 
ii) Approve project capital funding to be released for appointment of
external consultancy support to support feasibility studies and
development of Outline Business Cases for both projects; 
iii) Agrees to the appointment of Hub North Scotland Limited to
provide this consultancy support within the Strategic Support
Partnering Services under the contractual terms of the Territory
Partnering Agreement;   
Item 14.*
Page 203

Page 204

iv) Notes that following the announcement from the Scottish
Government on LEIP Phase 3 bids revised project timelines will be
communicated to this Committee; and 
(i) Notes that the Outline Business Cases will be presented to the
Education, Communities and Leisure Services Committee on
completion of the feasibility studies. 
3. BACKGROUND 
3.1 At the Economic  Growth, Housing and Environmental Sustainability
Committee Meeting on 24 August 2021, it was agreed to bring forward capital
budget for schools (£25,000) to fund Hub North Scotland Limited (HNSL) 
support to the LEIP Phase 3 submission process with a focus on Forres and
Buckie Associated Schools Group (para 18 of the minute refers). 
3.2 The Council approved at the meeting on 28 September 2022 a LEIP Phase 3
bid submission to Scottish Government prior to the closing date of Monday 31
October 2022 (para 26 of the minute refers).  The submission supported
future options for Buckie High School and Forres Academy – both with
already approved Project Mandates - with no preference for either project
indicated. It was noted that the possible outcome options of the bidding
process were that: 
(a) both projects are successful in bid LEIP for Phase 3 funding; 
(b) one project is successful in bid for LEIP Phase 3 funding; or, 
(c) neither project is successful in bid for LEIP Phase 3 funding. 
3.3 In the event of only a single project being successful it was agreed with
Scottish Future Trust, who are managing the LEIP Phase 3 selection process
on behalf of Scottish Government, that Moray would indicate a post bid
prioritisation of projects following completion of the Buckie by-election. 
3.4 At the Special meeting of Education, Children and Leisure Services
Committee meeting held on 7 November 2022 it was acknowledged that there
would be benefits of delivering both projects earlier than currently planned;
however, it was noted that the delivery of the Future Forres Academy project
earlier would mitigate the significant risks relating to the current school
condition in terms of school operation and annual repair and maintenance
costs. Consequently, Forres Academy was identified as the priority project for
LEIP 3 funding should only one project be successful in the bidding process
(para 4 of the minute refers). 
3.5 Due to the similar deteriorating condition of the current Buckie High School
the Learning Estate Programme continue to progress the Future Buckie High
School project as an investment priority for the Council despite the lower LEIP
funding priority status. 
3.6 A decision on LEIP Phase 3 funding was expected by end 2022; however due
to a number reasons this has been delayed. It is currently anticipated that a
Page 204

Page 205

decision will be made within the next couple of months, however, no date has
been advised for this. The delayed decision is expected to see the operational
completion dates for LEIP Phase 3 projects moved to 2028.   
4. NEXT STEPS - PROPOSAL 
4.1 While a decision from the Scottish Government is awaited there is a
requirement, irrespective of the LEIP Phase 3 decision, to progress the
development of the project brief and outline business case for both the Future
Forres Academy and Buckie High School projects. 
4.2 Given the scale, scope and potential cost risks associated with progressing
the design, build and operational assessment management of these projects it
is proposed to engage HNSL to undertake a project feasibility/project
definition for both projects. HNSL were successful in supporting the Moray
Council LEIP 3 Scottish Government submissions, are working with other
local authorities within the Northern Territory Partnership on similar work and
have acted on behalf of Moray Council to deliver recent projects of similar
scale, Lossiemouth High School and Elgin High School.   
4.3 HNSL is one of the five public-private partnership companies set up across
Scotland. Developed as a Scotland-wide initiative, led by Scottish Futures
Trust (an executive non-department public body of the Scottish Government),
to support new community infrastructure delivery. The establishment of the
HNSL Framework was procured in compliance with OJEU requirements and
establishes the structure and agreements for collaborative working
underpinned by our Shareholder Agreement and Territory Partnering
Agreement. 
4.4 HNSL were asked to develop a Strategic Support Partnering Services
(‘SSPS’) proposal for the Council under the terms of the established Territory
Partnering Agreement to support the next phases of both projects.  The
detailed HNSL proposals are provided as Background Papers. The high level
scope and extent of this SSPS is to provide development management
services for these projects over the following two phases (which will be
undertaken concurrently): 
• SSPS Phase A – Project Definition (Royal Institute of British
Architects (RIBA) Stage 0) 
Visioning and strategy definition, existing information analysis,
development of education briefing, lessons learnt analysis and desktop
appraisal of site options.  Building on the exercise completed to support
the LEIP 3 Funding application and Strategic Options Case. 
• SSPS Phase B – Outline Business Case (RIBA Stage 1) 
Visits to recently completed facilities, site appraisals and
recommendations, updated programme, RIBA Stage 1 Design (to be
used on any of the site options) together with M&E Services Strategy
and Cost Plan.   
4.5 The key deliverables from Phase A and B would be a detailed Design Brief
and Outline Business Case (with updated cost model) respectively. Progress
Page 205

Page 206

update reports would be provided to the Committee following the completion
of each phase. The target completion date for Phase A and Phase B is end
Mar 24.   
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)
This report supports the LOIP outcomes: 
i) Building a better future for children and young people in
Moray: Healthier Children: children get the healthiest start in life
and are supported to achieve the best possible mental health
and wellbeing and there is equity for vulnerable groups. 
And the aims of the Corporate Plan to: 
ii) Improve health and wellbeing for the people of Moray. 
(b) Policy and Legal
There are no policy or legal implications arising from this proposal.
The Schools (Consultation) (Scotland) Act 2010 sets out the legal
requirements for consultation on relevant proposals affecting individual
schools. The proposed approach supports and encourages that
process. 
(c) Financial implications
When the Council approved the budget for 2022/23 on 22 February
2022 (paragraph 3 of the Minute refers) it balanced only by using
reserves and one-off financial flexibilities. The indicative 3 year budget
showed a likely requirement to continue to make savings in the order of
£20 million in the next two years. All financial decisions must be made
in this context and only essential additional expenditure should be
agreed in the course of the year. In making this determination the
Council should consider whether the financial risk to the Council of
incurring additional expenditure outweighs the risk to the Council of not
incurring that expenditure, as set out in the risk section below and
whether a decision on funding could reasonably be deferred until the
budget for future years is approved. 
The LEIP 3 funding model is revenue based, with revenue payments
made by the Scottish Government over the 25 year life of the proposed
facility. Funding is released on a phased basis on achievement of agreed
outcomes set out by Scottish Government at Appendix 1. 
The estimated cost to support the SSPS proposal breakdown as follows: 
Future
Forres
Academy
Future
Buckie High
School
Total
Phase A - Project
Definition
£33,228 £32,728 £65,956
Phase B - Outline £46,202 £42,702 £88,904
Page 206

Page 207

Business Case
Totals £79,430 £75,430 £154,860  
The total fee proposal from HNSL to take the both projects to RIBA
Stage 1 and Outline Business Case is £154,860 with all spend planned
within financial year 2023/24. This is within the approved financial year
23/24 capital funding of £654,000 allocated to the Learning Estate
Strategy Delivery Programme. 
(d) Risk Implications
There are no significant risks arising from this report. Progression of the
feasibility studies and business case development will be required
regardless of LEIP Phase 3 funding being secured or not. 
(e) Staffing Implications
There are no specific staffing implications arising from this proposal at
this stage. Future reports will provide staffing implications updates as
appropriate. 
(f) Property
There are no property implications arising from this report. 
(g) Equalities/Socio Economic Impact
The quality of the learning environment can impact on learning and
attainment by as much as 16%. The condition and suitability of our
learning estate, and capacity challenges associated with both growth
and population decline in some areas, give rise to unequal opportunity
across Moray. 
This proposal supports the Learning Estate Strategy requirement that
all Learning Estate buildings meet minimum standards and are fit for
purpose. 
Equality impact assessments will be carried out as appropriate during
the development of the outline business cases in order to ensure that
benefits are distributed fairly and impacts on groups protected under the
Equality Act 2010 are identified and, where reasonably possible,
mitigated. 
(h) Climate Change and Biodiversity Impacts
Although there are no immediate climate change implications directly
arising from this report both projects supported by this proposal are fully
cognisant of the need to attend to the embodied carbon impacts during
construction and whole life operational carbon use of the future
infrastructure. The scale of this overall impact will be assessed in detail
within the outline business cases for the projects and this will be
balanced against the current operational carbon budgets. As required by
the LEIP Phase 3 funding model, a design approach which ensures
energy efficiency and embodied carbon savings will be key to ensuring
that the forecast reductions in carbon emissions are realised by the
project. 
Page 207

Page 208

Although dependent on the design approach taken it is anticipated that
there will be a significant reduction in operational carbon during the life of
any future school building that will outweigh the construction carbon
budget. As part of the carbon management planning, wider emissions
would be considered, such as opportunities to promote active travel and
reduce the need for car travel to the school. 
(i) Consultations
Chief Financial Officer, Head of Education (Chief Education Officer),
Head of Environmental and Commercial Services, Head of Housing and
Property, Head of Economic Growth and Development Services, Head of
Governance, Strategy and Performance, Democratic Services Manager,
Equal Opportunities Officer and  members of the Learning Estate
Programme Board and members of the Asset Management Working
Group have been consulted and the comments received have been
incorporated into the report. 
6. CONCLUSION 
6.1 While the Council awaits the outcome of its bid submissions for Scottish
Government’s Learning Estate Investment Programme (LEIP) Phase 3
funding there remains the requirement to progress work on the Future
Forres Academy and Future Buckie High School projects. 
6.2 Approval is sought for the release of capital funding to facilitate the
appointment of external consultancy support to the project feasibility
studies and development of Outline Business Cases for both projects. It
is recommended that Hub North Scotland Limited are appointed to
provide the consultancy support within a Strategic Support Partnering
Services under the contractual terms of the Territory Partnering
Agreement.   
6.3 An update report will be submitted to Committee on completion of the
project feasibility studies and Outline Business Cases. 
Author of Report: Andy Hall (Acting Head of Service, Education Resources and
Communities)  
Background Papers: 
1: Hub North Scotland Limited - Strategic Support Partnering Services
Proposal for Future Forres Academy Project 
2: Hub North Scotland Limited - Strategic Support Partnering Services
Proposal for Future Buckie High School Project  
Appendix 1: Learning Estate Investment Programme (Phase 3) – Outcome-based
Funding Criteria 
Ref: SPMAN-9425411-273 
SPMAN-9425411-279 
SPMAN-9425411-280 
SPMAN-9425411-274
Page 208

Page 209

Appendix 1 
Page 1 of 8
Client Confidential  
Hub North Scotland Limited         
The Moray Council | Future School for Forres| (A) Project Definition
and (B) Strategic Outline Business Case Options Appraisals
Strategic Support Partnering Services
23rd August 2023 Rev06   
INTRODUCTION 
hub North Scotland Limited (hNSL) are pleased to present this proposal to provide Strategic Support
Partnering Services (‘SSPS’) to The Moray Council (‘TMC’) under the terms of the Territory Partnering
Agreement (‘TPA’) supporting development of the Future School for Forres.  The scope and extent of this SSPS is
to provide development management services for this project over the following two phases: 
SSPS Phase A – Project Definition 
• Visioning and strategy definition, existing information analysis, development of education briefing, lessons
learnt analysis and desktop appraisal of site options.  Building on the exercise completed to support the
LEIP 3 Funding application and Strategic Outline Business Case. 
SSPS Phase B – Strategic Outline Business Case Options Appraisal 
• Visits to recently completed facilities, site appraisals and recommendations, updated programme, RIBA
Stage 1 Design (to be used on either of the site options) together with M&E Services Strategy and Cost Plan. 
Continued support to TMC in common good land acquisition and incorporation of learning from the BE-ST
programme. 
BACKGROUND & PURPOSE 
The proposed new 1,161 pupil (1121 Secondary and 40 Level 3 ASN) capacity future school at Forres will
accommodate pupils from Forres and the wider community.  The final location of the new school within the town
is to be defined during the initial development phases and the existing school will remain fully operational during
the construction of the new school building. 
This future school for Forres will be at the heart of a more vibrant and thriving community, providing a positive
education destination for young people in a modern school estate with access to lifelong learning for all learners.
The welcoming, flexible spaces will also be well used by members of the community, enhancing their wellbeing
and supporting community cohesion. 
Innovation will be central to the future school, promoting and supporting partnership working with service
providers, employers, and community partners for the benefit of all together with ensuring development and
promotion of the skills and attributes required by our young people and adult learners to be successful in gaining
local employment and contributing to the local economy. Local resources and expertise will be utilised to ensure
a low carbon footprint with reduced revenue, operational, repair, and maintenance costs. 
Further key features of the proposed school include: 
• A welcoming and integrated learning estate that could facilitate the delivery of a range of community
services and opportunities into one location. Including: enterprise, family learning, further education,
workspace for council and community use, health and social care services, police, fire, customer service
point, leisure, library, and voluntary organisations. The facilities will be seen as a flexible community
asset.
SSPS Proposal
Item 14.*
Page 209

Page 210

Appendix 1 
Page 2 of 8
Client Confidential
• Learning spaces which are creative and inspiring, able to be used flexibly to support a range of learning
styles and pedagogical approaches. It will be futureproofed and support the learner journey at all
stages, including transition. It will include excellent, flexible provisions for: ASN, nurture, STEM, theatre
and performance, sport, and leisure with an emphasis on community health and wellbeing, and space to
celebrate culture and display art around the estate. Learners of all ages will be able to utilise the
facilities through the school day and beyond via the adoption of adaptable and flexible private, shared,
and invited learning spaces.
• External spaces that are an integral part of both learning and community experience, engaging and
supporting learners through the provision of high quality external social and curriculum areas with space
for growing and enterprise activities. Spaces will be created that can be used all year allowing the
outdoors to be brought inside, to support wellbeing and enhanced learning.
• Facilities that are fully accessible to those learning, working, and visiting.
• A site that will be accessible through integrated walking, cycling and public transport routes.
• High quality connectivity and digital technology to provide high quality virtual learning and face-to-face
opportunities.
• Operational sustainability making best use of local resources to reduce their carbon footprint, provide
spaces that support healthy and cohesive communities, and offer opportunities to generate sustainable
revenue streams.
• Maximisation of innovation, including collaborating with the marine, aquaculture, food and drink,
tourism, health and social care and construction sectors to skill up their future workforce, developing
low carbon energy solutions and creating efficient/low carbon learning estate.
• Engagement is key to the success of this project, a place-based approach to development and delivered
in consultation with the local communities in line with the Community Engagement Standards. 
PROPOSED DELIVERY STRATEGY 
As previously noted, the key initial activities in this SSPS proposal have been split into two phases: 
Phase A – Project Definition 
Phase B – Strategic Outline Business Case Options Appraisal 
Proposed Programme 
The current proposed programme for these Phases is summarized below, this will require to be finalised
once the full team are appointed: 
2023       2024    
Aug Sep Oct Nov Dec Jan Feb Mar                  
Development of SSPS                     
TMC Committee Approval of SSPS                                
SSPS Phase A (Project Definition)                                  
SSPS Phase B (SOC including RIBA Stage 1)                                   
Page 210

Page 211

Appendix 1 
Page 3 of 8
Client Confidential 
Key Activities 
Activity  Action
Holder
Date Key Contents
Existing Information
Pack to be released (if
available) – if not
hNSL will work with
TMC to define what
support is required to
assemble 
TMC  1. SOC completed to date (notes relating to critical Council
decisions;
2. Confirmation of facility scope: 3-18 Campus, High School
or Community Campus etc,
3. List of services to be included in project (community
learning/resource requirements, etc);
4. Current Roll projections;
5. Learning Estate Strategy; 
6. Sustainability Strategy;
7. LOIP;
8. Scotland’s Learning Estate Strategy;
9. Place Based Reviews completed to date;
10. Existing building condition surveys;
11. Work currently underway to determine options for
rebuild or refurbishment and NZC challenges;
12. Existing building asbestos surveys;
13. Stakeholder List currently envisaged as:
a. Community Council
b. Education Leads (head teachers and senior leadership
team)
c.  Central Education to provide strategic direction
14. Elgin High School Extension design outcome delivering
non-traditional (school of the future) layout (qty and size
of rooms) and management strategy.
15. Forres alternative site options (2 Nr) summarised as
follows; 
Site A – Requires review of missing criteria regarding
carbon reduction/ sustainable travel to the site.  Also
this is currently designated an ENV site in the LDP and
identified for placement of a 4G pitch.  Also noted
flooding issues 
Site B – Requires discussion with Senior Engineer
(Transportation) regarding traffic flows/ access to the
site.  This is also identified as an ENV site in the LDP. ENV
sites are safeguarding green space unless they are
required for essential infrastructure, which is thought in
this instance could be a case for change of use.  Also
may be worthwhile extending the search area to the
east end of Grant Park (currently where the fairground
set up) as may provide a further option. 
If any of this information is not available, hNSL will work with
TMC to understand requirements further and develop a response
to these in collaboration with the wider team. 
Page 211

Page 212

Appendix 1 
Page 4 of 8
Client Confidential 
TMC Committee
Approval
TMC 19/09 TMC to then provide written instruction to hNSL to proceed with
SSPS Phase A
SSPS Phase A (Project
Definition)
hNSL TBC 1. Visioning and Strategy.  An initial exercise will be to
reconfirm the Vision and Success Process with SMART
objectives defined so that there is a common
understanding of what project success within the TMC
team will look like. Understanding advances in strategy
since the previous visioning process was completed;
2. Existing information Analysis.  Available information to
be reviewed and shared with designers as appropriate to
inform detailed methodology and response;
3. Development of the Education Briefing in collaboration
with all relevant TMC stakeholders.  This would include:
Working with the TMC Project Manager to agree key
activities, feedback on emerging outcomes, to develop
the brief for a new secondary school using the following
strategy:
a) Working with TMC Education Leads to understand
the local context, opportunities and challenges; the
curriculum model; expected growth in pupil
numbers from current capacity to expected
capacity; and community use aspirations;
b) Workshops with existing staff (TMC will look to
establish a Secondary School education focus group
that will involve more than one HT and potential
heads of subject), pupils and parent representatives
to understand aspirations for school specific
learning and social spaces (internal and external),
adjacencies and detailed design principles for the
new spaces, and to determine future flexibility and
change management requirements for the project;
c) Liaising with Hub North colleagues (SFT, Learning
Crowd, Ryder, JMA, hNSL) to incorporate place-
based requirements from previous place based
review and agree elements between TMC & hNSL
that require to be incorporated in the project. 
Identify indicative partner cost contribution
requirements;
d) Development of an adjacencies diagram showing
the desired relationship between key curriculum,
social and community spaces, including between
indoor and outdoor spaces, and zoning for different
uses;
e) Review what has been done at Elgin High School
extension with respect to a ‘new’ approach to space
and flexibility. Set out the range and number of
spaces required and their size;
f) Precedence review with other Authorities on
lessons learnt and operational modelling (SFT to
lead);
4. Lessons Learned What went well from previous
education investment (Elgin High School, Lossiemouth,
Linkwood, Elgin High School Extension) etc) and what
lessons can we take forward to improve outcomes. 
Learnings from CV-19: new service models and
community needs, linked to response during pandemic. 
Structured learning from National LEIP Projects learning
Page 212

Page 213

Appendix 1 
Page 5 of 8
Client Confidential
5. Desktop appraisal of the two identified Forres site
options with progression of the comments/actions
identified in the initial information pack.  TMC to take
the lead on Strategic, Planning and Legal workstreams,
hNSL to assist where necessary. 
Should further consultation be required,  hNSL will work with
TMC to understand requirements further and develop a response
to these in collaboration with the wider team. 
TMC Approval of
hNSL SSPS Phase A
submission
TMC TBC TMC to provide written instruction to hNSL to proceed to
SSPS Phase B
SSPS Phase B
(Strategic Outline
Business Case Options
Appraisal)
hNSL TBC 1. Site Visits.  Arrange site visits to recently completed
similar schools and appraise/evaluate design
aspects. 
2. Site Appraisal.  Desktop Engineering Site Appraisal.
Constraints Plan and commence SI design as and
when building design/layout sufficiently
developed across the two options identified.
3. RIBA Stage 1 Design. Initial building
layouts/adjacencies and compile first draft of
Schedule of Accommodation. Site Layout
Strategy.  Desktop Abnormals assessment. 
Refresh of Visioning and smart objectives
sessions.  Note that Forres proposal is to be
capable of being used on the two alternative site
options.
4. RIBA Stage 1 M&E Strategy.  Utilities assessment
and load requirements across two sites. Outline
Energy Strategy including targets and elemental
system summary and Net Zero Options. Desktop
Abnormals assessment.
5. RIBA Stage 1 Cost Plan.  Undertake outline cost
appraisal, including assessing location factors.
Applying Local and National Cost metrics on cost
and area metrics with adjustment for abnormals,
location and scale. Application of learnings from
other hNSL projects and initial supply chain
engagement.  Cost assessment across two
identified sites to be produced.
6. Programme.  Refine development and construction
programme.
7. Forres Common Good Land Acquisition.  hNSL to
continue to support TMC officers in executing this
statutory process in an as efficient manner
possible in line with the development programme.
8. Incorporate continued learning from the BE-ST
programme.
9. Recommendation of most beneficial Forres site to
validate site options. 
TMC Approval of
hNSL SSPS Phase B
submission
TMC TBC TMC to sign off SSPS Phase B 
Page 213

Page 214

Appendix 1 
Page 6 of 8
Client Confidential
Proposed Budget 
This section provides the proposed budget for delivering these services based on information received and
discussions with TMC to date.  This can be adjusted to suit TMC further instructions as they develop.  All rates
and prices quoted have been considered in the context of achieving Value for Money within agreed schedule of
rates and include negotiated discounts. 
In Stage A, hNSL will provide overall Commission Management, including general management of supply chain,
coordination with Client and reporting. hNSL will also provide input into the OBC in conjunction with TMC. 
In Stage B, hNSL will provide the same services in Stage A plus programme production and updates, as well as
incorporation of continued learning from the BE-ST programme.
hNSL fees are included within the tasks as listed below: 
SSPS PHASE A 
Project Definition
Service
Responsibility 
Total (£) Notes 
Existing information Analysis hNSL (Full team) £2,241 Available information to be reviewed and
shared with designers as appropriate to
inform detailed methodology and response;
Visioning and Strategy hNSL(Ryder/JM/
Learning Crowd)
£13,862 An initial exercise will be to reconfirm the
Vision and Success Process with SMART
objectives defined so that there is a
common understanding of what project
success within the TMC team will look like.
Understanding advances in strategy since
the previous visioning process was
completed;
Development of the
Education Briefing
hNSL(Ryder/JM/
Learning Crowd)
£9,425 In collaboration with all relevant TMC
stakeholders.  This would include working
with the TMC Project Manager to agree key
activities, feedback on emerging outcomes,
to develop the brief for a new secondary
school.  Stakeholder workshops,
incorporation of place-based reviews,
adjacencies diagram, review of new
approaches to space and flexibility,
precedence review.
Lessons Learned hNSL(Ryder/JM/
Learning Crowd)
£1,412 What went well from previous education
investment (Elgin High School, Lossiemouth,
Linkwood, Elgin High School Extension) etc)
and what lessons can we take forward to
improve outcomes.  Learnings from CV-19:
new service models and community needs,
linked to response during pandemic. 
Structured learning from National LEIP
Projects learning
Desktop appraisal of Forres
site options
hNSL(Ryder/JM/
Goodsons/Rybka)
£6,288 Desktop appraisal of the 2 identified site
options.
Respond to the key issues raised across the
2 sites identified in the initial information
pack. TMC to take the lead on Strategic,
Planning and Legal workstreams, hNSL to
assist where necessary.
TOTAL SSPS PHASE A  £33,228 
Page 214

Page 215

Appendix 1 
Page 7 of 8
Client Confidential 
SSPS PHASE B 
Business Case Support
Service
Responsibility 
Total (£) Notes 
Site Appraisal hNSL (Goodsons) £2,669 Site visit to all sites, desktop engineering
site appraisal, and constraints plan.
Based on two options identified by TMC. 
Recommendation of most beneficial Forres
site to validate site options.
RIBA Stage 1 Architectural
Proposal
hNSL
(Ryder/JM/Learning
Crowd)
£19,246 RIBA Stage 1 Design to be applicable across
two sites.
Initial building layouts/adjacencies
Site Layout Strategy
Visioning and smart objectives sessions
RIBA Stage 1 M&E Proposal hNSL (Rybka) £6,005 Utilities assessment and load requirements
across two sites.
Outline Energy Strategy including targets,
elemental system summary and Net Zero
Options.
Abnormals assessment
Cost Advisory  hNSL (Currie &
Brown)
£11,611 Undertake outline cost appraisal across two
sites, assessing location factors. Applying
Local and National Cost metrics on cost and
area metrics with adjustment for
abnormals, location and scale. Application
of learnings from other hNSL projects and
initial supply chain engagement.
Whole life Cost Advisory TBC £4,671 Budget allowance, requirement, scope, and
fee to be agreed with TMC.  Based on
providing benchmark costs for Life Cycle
costs (excluding energy costs) and FM
Maintenance costs for fabric and services
only (excludes soft FM) across two sites.
Forres Common Good Land
Acquisition 
Incl hNSL to continue to support TMC officers in
executing this statutory process in an as
efficient manner possible in line with the
development programme.
Expenses  £2,000 Budget allowance for expenses
TOTAL SSPS PHASE B  £46,202      
TOTAL SSPS PHASE A &B   £79,430 All costs exclude VAT
Note that on conclusion of our joint
procurement process the following are
proposed as the preferred tier 1
consultancy team: 
Architect: JM/Ryder (JM leading on this
specific project).
Civil & Structural Engineer: Goodsons
M&E Services Engineer: Rybka
Project Manager: TBC 
Cost Consultant: Currie & Brown 
At the point of submitting this proposal the outcome of the LEIP Phase 3 bidding process has not been concluded
by Scottish Government. Accordingly, the requisite technical and performance parameters associated with the
project cannot be finalised. As part of the design development and planning process to support the development
of this project, a costed options appraisal will be completed which will assess a range of solutions to be agreed
Page 215

Page 216

Appendix 1 
Page 8 of 8
Client Confidential
with TMC.  It is understood this will include a range of LEIP Phase 3 standards for energy grading, net zero
building standards and current building regulations as a baseline. Following consideration and approval of the
SOC for the project and a preferred technical solution, this will form the basis of the next stage of development
(i.e. SSPS Phase C activities) and allow the hub Stage 1 process to be completed for the project, together with a
New Project Request being agreed.
With regards to site investigations, it should be noted that an allowance has been made during the Phase A and B
works of £5,000 for a maximum of 2 site appraisals/query responses in Forres.  This includes an initial site visit,
desktop engineering site appraisal, and constraints plan for each.   
The procurement action forms part of Programme Approach strategy which has been undertaken in conjunction
with other clients in the region, including Aberdeen City, Orkney, Shetland, and Argyll & Bute Councils. Within
this process, commercial proposals have been provided by each bidding consultant, outlining savings available if
further projects are commissioned based on a scaled approach.  Should TMC decide to make a commitment to
the Programme approach and the same advisory teams are appointed across the programme, the revised
commercial terms for the next stages of development will be included for the benefit of TMC.  At present, three
out of the eight projects in this programme have been confirmed, when more are added to the programme this
will reduce costs further due to economies of scale and increased buying power within the supply chain. 
It is assumed within all phases in this stage in the project that drafting of all SOC, OBC, FBC, committee papers
etc will be carried out by TMC.  hNSL can provide resource to carry out this role, TMC to confirm. 
NEXT STEPS – 
1. Agreement of SPSS Proposal with TMC
2. TMC provide acceptance of SSPS Proposal (Phase A+B works)
3. Instruction to proceed to Supply Chain
4. Delivery of SSPS Phase A+B works. 
Page 216

Page 217

Page 1 of 7
Client Confidential  
Appendix 2 
Hub North Scotland Limited         
The Moray Council | Future School for Buckie| (A) Project Definition
and (B) Strategic Outline Business Case Options Appraisals
Strategic Support Partnering Services
23rd August 2023 Rev06 
INTRODUCTION 
hub North Scotland Limited (hNSL) are pleased to present this proposal to provide Strategic Support
Partnering Services (‘SSPS’) to The Moray Council (‘TMC’) under the terms of the Territory Partnering
Agreement (‘TPA’) supporting development of the Future School for Buckie.  The scope and extent of this SSPS is
to provide development management services for this project over the following two phases: 
SSPS Phase A – Project Definition 
• Visioning and strategy definition, existing information analysis, development of education briefing, lessons
learnt analysis and desktop appraisal of site options. Building on the exercise completed to support the LEIP
3 Funding application and Strategic Outline Business Case 
SSPS Phase B – Strategic Outline Business Case Options Appraisal 
• Visits to recently completed facilities, site appraisals and recommendations, updated programme, RIBA
Stage 1 Design together with M&E Services Strategy, Cost Plan and incorporation of learning from the BE-ST
programme. 
BACKGROUND & PURPOSE 
The proposed new 976 pupil (944 Secondary and 32 Level 3 ASN) capacity future school at Buckie will
accommodate pupils from Buckie and the wider community.  It is currently proposed the new school will be built
on the sports field areas of the existing school which will then be reconstructed on the site of the existing school. 
It is assumed the existing school will remain fully operational during the construction of the new school building. 
This future school for Buckie will be at the heart of a more vibrant and thriving community, providing a positive
education destination for young people in a modern school estate with access to lifelong learning for all learners.
The welcoming, flexible spaces will also be well used by members of the community, enhancing their wellbeing
and supporting community cohesion. 
Innovation will be central to the future school, promoting and supporting partnership working with service
providers, employers and community partners for the benefit of all together with ensuring development and
promotion of the skills and attributes required by our young people and adult learners to be successful in gaining
local employment and contributing to the local economy. Local resources and expertise will be utilised to ensure
a low carbon footprint with reduced revenue, operational, repair, and maintenance costs. 
Further key features of the proposed school include: 
• A welcoming and integrated learning estate that could facilitate the delivery of a range of community
services and opportunities into one location. Including: enterprise, family learning, further education,
workspace for council and community use, health and social care services, police, fire, customer service
SSPS Proposal
Item 14.*
Page 217

Page 218

Page 2 of 7
Client Confidential
point, leisure, library and voluntary organisations. The facilities will be seen as a flexible community
asset.
• Learning spaces which are creative and inspiring, able to be used flexibly to support a range of learning
styles and pedagogical approaches. It will be futureproofed and support the learner journey at all
stages, including transition. It will include excellent, flexible provisions for: ASN, nurture, STEM, theatre
and performance, sport and leisure with an emphasis on community health and wellbeing, and space to
celebrate culture and display art around the estate. Learners of all ages will be able to utilise the
facilities through the school day and beyond via the adoption of adaptable and flexible private, shared
and invited learning spaces.
• External spaces that are an integral part of both learning and community experience, engaging and
supporting learners through the provision of high quality external social and curriculum areas with space
for growing and enterprise activities. Spaces will be created that can be used all year allowing the
outdoors to be brought inside, to support wellbeing and enhanced learning.
• Facilities that are fully accessible to those learning, working and visiting.
• A site that will be accessible through integrated walking, cycling and public transport routes.
• High quality connectivity and digital technology to provide high quality virtual learning and face-to-face
opportunities.
• Operational sustainability making best use of local resources to reduce their carbon footprint, provide
spaces that support healthy and cohesive communities, and offer opportunities to generate sustainable
revenue streams.
• Maximisation of innovation, including: collaborating with the marine, aquaculture, food and drink,
tourism, health and social care and construction sectors to skill up their future workforce, developing
low carbon energy solutions and creating efficient/low carbon learning estate.
• Engagement is key to the success of this project, a place-based approach to development and delivered
in consultation with the local communities in line with the Community Engagement Standards. 
PROPOSED DELIVERY STRATEGY 
As previously noted, the key initial activities in this SSPS proposal have been split into three phases: 
Phase A – Project Definition 
Phase B – Strategic Outline Business Case Options Appraisal 
Proposed Programme 
The current proposed programme for these Phases is summarized below, this will require to be finalised
once the full team are appointed: 
2023       2024    
Aug Sep Oct Nov Dec Jan Feb Mar                  
Development of SSPS                     
TMC Committee Approval of SSPS                                
SSPS Phase A (Project Definition)                                  
SSPS Phase B (SOC including RIBA Stage 1)                                  
Page 218

Page 219

Page 3 of 7
Client Confidential 
Key Activities 
Activity  Action
Holder
Date Key Contents
Existing Information
Pack to be released (if
available) – if not
hNSL will work with
TMC to define what
support is required to
assemble 
TMC  1. SOC completed to date (notes relating to critical Council
decisions;
2. Confirmation of facility scope: 3-18 Campus, High School
or Community Campus etc,
3. List of services to be included in project (community
learning/resource requirements, etc);
4. Current Roll projections;
5. Learning Estate Strategy; 
6. Sustainability Strategy;
7. LOIP;
8. Scotland’s Learning Estate Strategy;
9. Place Based Review completed to date;
10. Existing building condition surveys;
11. Work currently underway to determine options for
rebuild or refurbishment and NZC challenges;
12. Existing building asbestos surveys;
13. Stakeholder List currently envisaged as:
a. Community Council
b. Education Leads (head teachers and senior leadership
team)
c.  Central Education to provide strategic direction
14. Elgin High School Extension design outcome delivering
non-traditional (school of the future) layout (qty and size
of rooms) and management strategy.
15. Confirmation of site location, red boundary and title
report. 
If any of this information is not available, hNSL will work with
TMC to understand requirements further and develop a response
to these in collaboration with the wider team. 
TMC Committee
Approval
TMC 19/09 TMC to then provide written instruction to hNSL to proceed with
SSPS Phase A
SSPS Phase A (Project
Definition)
hNSL TBC 1. Visioning and Strategy.  An initial exercise will be to
reconfirm the Vision and Success Process with SMART
objectives defined so that there is a common
understanding of what project success within the TMC
team will look like. Understanding advances in strategy
since the previous visioning process was competed;
2. Existing information Analysis.  Available information to
be reviewed and shared with designers as appropriate to
inform detailed methodology and response;
3. Development of the Education Briefing in collaboration
with all relevant TMC stakeholders.  This would include:
Working with the TMC Project Manager to agree key
activities, feedback on emerging outcomes, to develop
the brief for a new secondary school using the following
strategy:
a) Working with TMC Education Leads to understand
Page 219

Page 220

Page 4 of 7
Client Confidential
the local context, opportunities and challenges; the
curriculum model; expected growth in pupil
numbers from current capacity to expected
capacity; and community use aspirations;
b) Workshops with existing staff (TMC will look to
establish a Secondary School education focus group
that will involve more than one HT and potential
heads of subject), pupils and parent representatives
to understand aspirations for school specific
learning and social spaces (internal and external),
adjacencies and detailed design principles for the
new spaces, and to determine future flexibility and
change management requirements for the project;
c) Liaising with Hub North colleagues (SFT, Learning
Crowd, Ryder, JMA, hNSL) to incorporate place-
based requirements from previous place based
review and agree elements between TMC & hNSL
that require to be incorporated in the project. 
Identify indicative partner cost contribution
requirements;
d) Development of an adjacencies diagram showing
the desired relationship between key curriculum,
social and community spaces, including between
indoor and outdoor spaces, and zoning for different
uses;
e) Review what has been done at Elgin High School
extension with respect to a ‘new’ approach to space
and flexibility. Set out the range and number of
spaces required and their size;
f) Precedence review with other Authorities on
lessons learnt and operational modelling (SFT to
lead);
4. Lessons Learned What went well from previous
education investment (Elgin High School, Lossiemouth,
Linkwood, Elgin High School Extension) etc) and what
lessons can we take forward to improve outcomes. 
Learnings from CV-19: new service models and
community needs, linked to response during pandemic. 
Structured learning from National LEIP Projects learning
5. Initial desktop appraisal of the identified site option. 
Should further consultation be required,  hNSL will work with
TMC to understand requirements further and develop a response
to these in collaboration with the wider team. 
TMC Approval of
hNSL SSPS Phase A
submission
TMC TBC TMC to provide written instruction to hNSL to proceed to
SSPS Phase B
SSPS Phase B
(Strategic Outline
Business Case Options
Appraisal)
hNSL TBC 1. Site Visits.  Arrange site visits to recently completed
similar schools and appraise/evaluate design
aspects. 
2. Site Appraisal.  Desktop Engineering Site Appraisal.
Constraints Plan and commence SI design as and
when building design/layout sufficiently
developed.
3. RIBA Stage 1 Design. Initial building
layouts/adjacencies and compile first draft of
Schedule of Accommodation. Site Layout
Page 220

Page 221

Page 5 of 7
Client Confidential
Strategy.  Desktop Abnormals assessment. 
Refresh of Visioning and smart objectives
sessions.  
4. RIBA Stage 1 M&E Strategy.  Utilities assessment
and load requirements. Outline Energy Strategy
including targets and elemental system summary
and Net Zero Options. Desktop Abnormals
assessment.
5. RIBA Stage 1 Cost Plan.  Undertake outline cost
appraisal, including assessing location factors.
Applying Local and National Cost metrics on cost
and area metrics with adjustment for abnormals,
location and scale. Application of learnings from
other hNSL projects and initial supply chain
engagement.
6. Programme.  Refine development and construction
programme.
7. Incorporate continued learning from the BE-ST
programme. 
TMC Approval of
hNSL SSPS Phase B
submission
TMC TBC TMC to sign off SSPS Phase B 
Proposed Budget 
This section provides the proposed budget for delivering these services based on information received and
discussions with TMC to date.  This can be adjusted to suit TMC further instructions as they develop.  All rates
and prices quoted have been considered in the context of achieving Value for Money within agreed schedule of
rates and include negotiated discounts. 
In Stage A, hNSL will provide overall Commission Management, including general management of supply chain,
coordination with Client and reporting. hNSL will also provide input into the OBC in conjunction with TMC. 
In Stage B, hNSL will provide the same services in Stage A plus programme production and updates, as well as
incorporation of continued learning from the BE-ST programme.
hNSL fees are included within the tasks as listed below: 
SSPS PHASE A 
Project Definition
Service
Responsibility 
Total (£) Notes 
Existing information Analysis hNSL (Full team) £2,077 Available information to be reviewed and
shared with designers as appropriate to
inform detailed methodology and response;
Visioning and Strategy hNSL(Ryder/JM/
Learning Crowd)
£13,861 An initial exercise will be to reconfirm the
Vision and Success Process with SMART
objectives defined so that there is a
common understanding of what project
success within the TMC team will look like.
Understanding advances in strategy since
the previous visioning process was
completed;
Development of the
Education Briefing
hNSL(Ryder/JM/
Learning Crowd)
£9,425 In collaboration with all relevant TMC
stakeholders.  This would include working
with the TMC Project Manager to agree key
activities, feedback on emerging outcomes,
to develop the brief for a new secondary
school.  Stakeholder workshops,
Page 221

Page 222

Page 6 of 7
Client Confidential
incorporation of place based reviews,
adjacencies diagram, review of new
approaches to space and flexibility,
precedence review.
Lessons Learned hNSL(Ryder/JM/
Learning Crowd)
£1,412  What went well from previous education
investment (Elgin High School, Lossiemouth,
Linkwood, Elgin High School Extension) etc)
and what lessons can we take forward to
improve outcomes.  Learnings from CV-19:
new service models and community needs,
linked to response during pandemic. 
Structured learning from National LEIP
Projects learning
Desktop appraisal of site  hNSL(Ryder/JM/
Goodsons/Rybka)
£5,953 Initial desktop appraisal of the identified
site option.  TMC to take the lead on
Strategic, Planning and Legal workstreams,
hNSL to assist where necessary.
TOTAL SSPS PHASE A  £32,728 
SSPS PHASE B 
Business Case Support
Service
Responsibility 
Total (£) Notes 
Site Appraisal hNSL (Goodsons) £1,372 Site visit, desktop engineering site appraisal,
and constraints plan. 
RIBA Stage 1 Architectural
Proposal
hNSL (Ryder/JM -
tbc)
£19,101 RIBA Stage 1 Design
Initial building layouts/adjacencies
Site Layout Strategy
Visioning and smart objectives sessions
RIBA Stage 1 M&E Proposal hNSL (Rybka - tbc) £4,803 Utilities assessment and load requirements
Outline Energy Strategy including targets,
elemental system summary and Net Zero
Options.
Abnormals assessment
Cost Advisory  hNSL (Currie &
Brown tbc)
£11,310 Undertake outline cost appraisal, assessing
location factors. Applying Local and
National Cost metrics on cost and area
metrics with adjustment for abnormals,
location and scale. Application of learnings
from other hNSL projects and initial supply
chain engagement.
Whole life Cost Advisory TBC £4,116 Budget allowance, requirement, scope, and
fee to be agreed with TMC.  Based on
providing benchmark costs for Life Cycle
costs (excluding energy costs) and FM
Maintenance costs for fabric and services
only (excludes soft FM).
Expenses  £2,000 Budget allowance for expenses
TOTAL SSPS PHASE B  £42,702 
TOTAL SSPS PHASE A+B  £75,430 All costs exclude VAT
Note that on conclusion of our joint
procurement process the following are
proposed as the preferred tier 1
consultancy team: 
Architect: JM/Ryder (JM leading on this
Page 222

Page 223

Page 7 of 7
Client Confidential
specific project).
Civil & Structural Engineer: Goodsons
M&E Services Engineer: Rybka
Project Manager: TBC 
Cost Consultant: Currie & Brown 
At the point of submitting this proposal the outcome of the LEIP Phase 3 bidding process has not been concluded
by Scottish Government. Accordingly, the requisite technical and performance parameters associated with the
project cannot be finalised. As part of the design development and planning process to support the development
of this project, a costed options appraisal will be completed which will assess a range of solutions to be agreed
with TMC.  It is understood this will include a range of LEIP Phase 3 standards for energy grading, net zero
building standards and current building regulations as a baseline. Following consideration and approval of the
SOC for the project and a preferred technical solution, this will form the basis of the next stage of development
(i.e. SSPS Phase C activities) and allow the hub Stage 1 process to be completed for the project, together with a
New Project Request being agreed.
With regards to site investigations, it should be noted that an allowance has been made during the Phase A and B
works of £1,000 for a site appraisal.  This includes an initial site visit, desktop engineering site appraisal, and
constraints plan for each.    
The procurement action forms part of Programme Approach strategy which has been undertaken in conjunction
with other clients in the region, including Aberdeen City, Orkney, Shetland, and Argyll & Bute Councils. Within
this process, commercial proposals have been provided by each bidding consultant, outlining savings available if
further projects are commissioned based on a scaled approach.  Should TMC decide to make a commitment to
the Programme approach and the same advisory teams are appointed across the programme, the revised
commercial terms will be included for the benefit of TMC.  At present, three out of the eight projects in this
programme have been confirmed, when more are added to the programme this will reduce costs further due to
economies of scale and increased buying power within the supply chain. 
It is assumed within all phases in this stage in the project that drafting of all SOC, OBC, FBC, committee papers
etc will be carried out by TMC.  hNSL can provide resource to carry out this role, TMC to confirm. 
NEXT STEPS – 
1. Agreement of SPSS Proposal with TMC
2. TMC provide acceptance of SSPS Proposal (Phase A+B works)
3. Instruction to proceed to Supply Chain
4. Delivery of SSPS Phase A+B works. 
Page 223

Page 224

Page 224

Page 225

Appendix 3 
Learning Estate Investment Programme (Phase 3) – Outcome-based Funding Criteria 
Scottish Government (SG) funding will be available through the Outcomes Based Funding (OBF) model. SG funding will be released as the achievement of
agreed outcomes is evidenced. The details of these outcomes are included in the table below: 
Funded Outcome Outcome to be achieved
1. Condition Local authorities must provide evidence, through their annual returns that the facility is kept in condition A or B for a
period of 25 years. 
This is intended to be a binary funding condition. In recognition of the potential for survey issues to be identified, removal
of funding would be suspended for one year to allow for rectification of any issues leading to a C condition rating. The
funding would be reinstated, the next financial year, once it could be demonstrated that the facility was in A/B condition
again. 
If the building drops into condition C more than once during a five-year period, the condition funding element will be
suspended without the one-year grace period, until the condition is rectified to A/B. 
In the event of exceptional circumstances such as fire or flood resulting in the condition of the building being unable to be
rectified to an A/B condition within 1 year of becoming a C, or meaning that the facility drops into condition C for a second
occasion, this will be reviewed on a case by case basis between the authority and SG.
2. Energy Efficiency Authorities must provide evidence that the in-use energy target of 67/kWh/sqm/p.a. for core hours of 2,000 p.a. and core
facilities is achieved. 
Core Facilities
To provide consistency of definition across the variety of projects in the programme, the following facilities are excluded
from
the total energy consumption target: 
• Dedicated community/health facilities
• Swimming pool/hydrotherapy pool
• External sports flood lighting
Item 14.*
Page 225

Page 226

• Production kitchens (serving multiple sites)
• Data centres (serving multiple sites)
• Electric Vehicle Charging Points
• Other (e.g. specialist vocational/industrial facilities, councils to propose) 
Within the remaining core facilities, all energy uses relating to the building and users are included in the energy target. The
target includes all consumed energy regardless of source e.g. energy provided from renewable sources is included in the
same manner as gas or electricity from the mains or grid. Contribution from heat pumps should be included on the output
side rather than input side to support the aim of creating energy efficient buildings using a fabric first approach. 
Core Hours
To recognise that councils and individual schools have different operational hours and term dates, the target is anticipated
to cover all energy uses during a bank of 2000 operational hours per annum. If the facilities are operational for more or
less hours then a pro rata approach should be taken to compare against the target.
Building use purely for cleaning, maintenance or security tasks will not be considered as operational hours. 
Example
To report on previous year:
• total open operational hours of a facility for school and community use (excluding cleaning etc) = 3000 hours
• total annual energy consumption from all sources (after exclusions) = 120 kWh/m2/annum
• reportable core energy consumption would be (2000/3000) x 120 = 80 kWh/m2/annum 
Energy Outcome Funding
This is recognised as being an ambitious target, therefore it is not anticipated that this will be a pass/fail outcome for
funding but that a sliding scale will be attached. 
From feedback and discussion with Directors of Finance, ADES Resources and SHOPs the sliding scale is grouped into
ranges with a corresponding alteration to funding depending on which range is demonstrated as being achieved: 
Page 226

Page 227

If the facility exceeds 130/ kWh/sqm/p.a for core hour use of energy use – no funding will be available for that outcome. 
The funding for the energy outcome will commence in year 3 of operations to allow a 2-year period to monitor in use
energy consumption and optimise systems and behaviour. At the end of year 2 the in-use energy will be measured, and
this will determine the initial funding band. 
Following the initial reporting of the energy target at the end of year 2, the energy outcome will be assessed every 5 years
in years 7, 12, 17 and 22. The rolling five-year average is what should be reported. In the event of a change of performance
from the previous measurement, there will be a 1-year grace period to allow Councils to rectify the change and bring back
to the original target of maintain improved energy performance, before any required changes, to funding are
implemented. 
3. Digitally Enabled
Learning
Digital is an evolving and fast-growing area and one that is becoming more prevalent in every-day learning as digital
learning and teaching strategies continue to develop. 
To ensure facilities are future proofed and able to continue to support high quality digital learning and teaching, regardless
of technology advancement, the local authority must provide evidence that the underlying digital infrastructure of the
facility is capable of supporting 11Gbps. This underlying infrastructure should extend to at least one point within every
learning and teaching space throughout the facility. 
Page 227

Page 228

If the cost of providing the initial connection speed to the facility is prohibitively expensive due to geographic location or it
is not physically possible yet in that location, this can be reviewed on a case by case basis to establish an appropriate
solution. 
4. Economic Growth Investment in infrastructure is synonymous with economic growth. The Construction Industry Training Board (CITB) has
published benchmarks outlining how many new jobs should be supported from investment in the education sector. 
The authority will require to collate and provide evidence that they have met the target for jobs supported as per the CITB
benchmarks published July 2017. The number of jobs to be supported depends on the size of investment (based on
construction contract value): 
Funding will be available if the relevant target is achieved. If this is not achieved in full, funding will be adjusted
accordingly.
E.g. if 12 jobs is the target but only 11 are evidenced as being achieved then 11/12ths of the funding for that outcome will
be available. 
This outcome could be multi-faceted and also provide a measure to ensure training places are supported and learner
engagement is embedded in the design and construction process through site visits and work experience placements. 
It is proposed that because the achievement of this outcome will happen in the design and construction phase of the
project that the funding for it, if achieved, is received in the first two years of operations, rather than extend over the 25-
year period.
5. Construction Embodied
Carbon
Reducing Whole Life Carbon is key to ensuring the long-term sustainability of the learning estate. Building on the
Operational Energy Target already established in LEIP, the opportunity exists to significantly reduce the Construction
Embodied Carbon footprint from inception, through design and construction to practical completion. 
Construction Embodied Carbon Outcome 
Page 228

Page 229

Local authorities should evidence that the construction embodied carbon target of 600 kgCO2e/m2 for core facilities is
achieved. Local authorities should track and record this throughout the project stages using an assessment tool compliant
with BRE IMPACT methodology managed by an assessor with appropriate expertise. 
Evidence of achieving this target using actual material, product, transport and contractor activity data will be required at
project completion. 
Methodology 
The Construction Embodied Carbon target should be assessed for the building and external plant only, excluding external
works and loose FF+E. This should include Stages A1-A5 “from cradle to practical completion” as defined in the RICS
Professional Statement of Whole Life Carbon: 
- A1-A3: Products/Materials (c. 95% of target CO2 emissions) 
- A4: Transport of materials and products to site 
- A5: Construction site operations 
Local Authorities should consider the guidance in the Net Zero Public Sector Building Standard (NZPSBS) Objective 2. 
Core Facilities 
To provide consistency of definition across the variety of projects in the programme, the Construction Embodied Carbon
target should only include the core facilities, as defined in Outcome 2 – Energy Efficiency. 
Construction Embodied Carbon Outcome Funding 
This is recognised as being an ambitious target, therefore it is not anticipated that this will be a pass/fail outcome for
funding but that a sliding scale will be attached. 
The construction embodied target funding is grouped into bands corresponding alteration to funding depending on which
range is demonstrated as being achieved: 
Page 229

Page 230

If the facility exceeds 800 kgCO2e/m2 of construction embodied carbon, no funding will be available for that outcome. 
Refurbishment
The Construction Embodied Carbon funding targets will apply to all projects in the programme – Newbuilds,
Refurbishments and Extensions. Where a proposed project has over 50% GIFA as refurbishment it will automatically be
deemed Band A compliant and receive 100% associated Construction Embodied Carbon funding. A Construction Embodied
Carbon assessment should be provided for all projects. 
Page 230

Page 231

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 19 SEPTEMBER 2023 
SUBJECT: INFORMATION REPORT: SUMMER HOLIDAY 2023 FUNDING 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the distribution of funding received from the
Scottish Government to support Summer Holiday 2023 provision. 
1.2 This report is submitted to Committee in terms of Section III (D) (1) of the
Council's Scheme of Administration relating to exercise all the functions of the
Council as Education Authority within the terms of relevant legislation with
regard to nursery, primary, secondary, and further education; community
learning and development; and to determine the Council’s policies in regard
thereto. 
2. BACKGROUND 
2.1 On 14 June 2023 the Council received an email from COSLA stating that the
Scottish Government (SG) had identified £4million for Local Government for
summer activities. 
2.2 A further email received on 16 June 2023 from SG stated their intentions to
support local authorities with some of the costs relating to delivery of summer
programmes for children from low income families during the 2023 school
summer holidays.  However the funding required formal approval at the
Settlement Distribution Group on the 21 June 2023 and then at COSLA
Leaders meeting on 30 June 2023. 
2.3 On 23 June 2023 the Council received a letter from SG advising that Moray
would be receiving indicative funding of £67,937 dependant on decision on 30
June 2023.  The funding was to provide targeted access to activities, childcare
and food during the summer holiday period for primary school age children
from low-income families. 
2.4 Formal confirmation of this funding was received on 3 July 2023.  In the
interim period, organisations who had already planned delivery of activities
and childcare provision in Moray were contacted via the Locality Networks to
Page 231

Page 232

enquire whether through some additional funding they could enhance or
expand their offering. 
2.5 Due to the timescales, a swift turnaround of funding allocation was required
with the funding being ratified by the GIRFEC Leadership Group.  The
following 21 organisations/departments were awarded the following funding; 
Organisation Funding
Allocation
Participants
Involved
Activities
delivered
Area of
Moray
The Lossie 2-3
group
£7,500 Over 100
children 
Summer
Playscheme inc
food provision
and trips
Lossie
Fika Child and
Family Centre
£1,000 40 children Summer Camp
for 3wks
Elgin
Children 1st  £1,000 70 children
and 48
adults (118
in total)
7 trips and
activities, food,
transport and
entry fees
Moray/East
of Moray
Speyside
Children’s Arts
Festival
£500 93 (49 of
which from
low income
families)
Food provision
as part of Arts
Festival 
Speyside
Moray Sports
Centre
£2,250 14 children
across
multiple
weeks
Funded places
on Summer
Holiday Sports
Camp inc. food
Elgin
Arrows £2,520 44 children
attended the
activity days
and 23
families
attended the
trips
Activity days,
equipment, trips,
food provision
Moray
Outfit Moray £8,080 114
participants
18 activity days
inc. food and
transport
Moray
Elgin Youth
Development
Group
£4,649 59 children
(47 of these
at least from
low income)
Additional
spaces on 29
activities inc.
transport, food
and trips
Elgin
Fochabers
Petanque and
Fochabers
Bowling Clubs
£750 19 children
and 13
adults (32 in
total)
Two sessions
delivered with
new equipment –
more being
planned 
Fochabers
Buckie High
(Raising
Attainment)
£664 15 children
(10 of which
from low
income
families)
Parkour
workshops,
venue hire and
snacks
Buckie
Page 232

Page 233

Moray School
Bank
£7,700 109 children
and 76
adults (185
in total)
7 trips – travel,
entry fees and
lunch for 112
participants
Moray
Street Football £500 71
participants
Transport
provision 
Elgin
Libraries and
Learning
Centre Team
£6,725 494
children,
258 adults
(752 in total)
– unknown
how many
from low
income
Equipment,
training and
staffing to deliver
digital sessions
and food
Across 9
libraries in
Moray
Moray
Women’s Aid
£2,084 18 families
which
included 27
children (45
in total)
Trip to
Landmark,
childcare
provision and
food
Families
from Elgin,
Buckie,
Forres and
Lossiemouth.
Forres Osprey
Bus Summer
Holiday Club
£3,000 96
participants
10 day trips as
part of holiday
club
Forres
Wild Things £3,850 No
evaluation
submitted as
yet
7 days of activity
in outdoor
adventure and
learning, inc
transport & food
West of
Moray
The Loft Youth
Project
£3,000 76
participants
Upscale activity
programme and
food provision
Keith
Army Welfare
Community
Services
£7,465 190
participants
Upscale activity
programme and
spaces, food,
additional
residential
places
Kinloss
Moray Flying
Circus
£950 38 children Free places on
taster sessions
and circus
camps, food and
transport
West of
Moray
New Elgin East
Community
Planning
Group
£750 49 families Contribute to
summer
programme –
food, equipment
and activities
New Elgin
Autism and
Neurodiversity
North Scotland
£3,000 19
participants
(15 from low
income
families)
Trips, transport
and food 
Moray
TOTAL £67,937 Minimum of  
Page 233

Page 234

2,173
participants 
2.6 Due to the very late timing of this Scottish Government funding there was no
expectation to collate qualitative or quantitative feedback on the utilisation of
these funds and instead informal meetings after the Summer will be held with
Local Authorities to provide verbal and informal feedback gathered. 
Appendix I provides some additional information on what was delivered by
the 21 Moray projects. 
2.7 89% of the above Scottish Government Summer funding was distributed to
external organisations.  The 11% funding distributed internally went to Buckie
High, Street Football and Libraries, Learning Centre activities.  The
Communities Service and Sport and Culture Service also provided activities
for young people through their youth work, family and adult learning, sport and
leisure, active schools and libraries and learning centre teams which were all
open to all.  The Council do not operate holiday childcare nor holiday camps
as it does not have staffing/resource to provide such an offering nor is it a
statutory requirement.   
3. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)
This report supports the LOIP outcomes;
• Building a better future for children and young people in Moray
• A place where children and young people thrive;
• A place where they have a voice, have opportunities to learn and can
get around;
• A place where they are able to reach their full potential. 
This report also supports the aims of the Corporate Plan to;
• Provide opportunities where young people can achieve the potential to
be the best they can be. 
(b) Policy and Legal
There are no policy or legal implications arising from this report. 
(c) Financial implications
There are no financial implications arising directly from this report. The
targeted summer provision is fully funded by the Scottish Government. 
(d) Risk Implications
There are no specific risk implications arising from this report, however it
should be noted that this programme of support has been developed
within a very short timescale and has been limited by the childcare and
activities provision available within Moray at short notice. 
(e) Staffing Implications
There no staffing implications arising directly from this report. 
Page 234

Page 235

(f) Property
There are no property implications arising from this report. 
(g) Equalities/Socio Economic Impact
The activities, childcare and food provided were targeted to low income
families.  Principles of dignity and human rights were promoted by all
involved through the promotion of non-stigmatising provision of services
and supports. 
(h) Climate Change and Biodiversity Impacts
No climate change or biodiversity implications have been determined for
the Summer Holiday 2023 funding. 
(i) Consultations
The GIRFEC Leadership Group, Chief Financial Officer and Tracey
Sutherland (Committee Services Officer) have been consulted in regards
to this report. 
4. CONCLUSION 
4.1 To note the utilisation of the Scottish Government Summer Holiday 2023
funding which targeted access to activities, childcare and food for
primary school age children from low income families. 
Author of Report: Kim Slater, Sport and Culture Service Manager
Background Papers: 
Ref: SPMAN-9425411-265 
SPMAN-9425411-278 
Page 235

Page 236

Page 236

Page 237

Appendix I
Information Report Summer Holiday 2023 Funding  
Organisation Feedback
The Lossie 2-3
group
Through the holiday club we supported over 100 children
(Average of 50 each week) All children came from low-income
families. 60 % of the children were from working families in
poverty, 15% of children were ASN. 
Many of the children are from families our charity supports
throughout the year, another few were referrals from agencies.  
We were also very fortunate to have 10 experienced
volunteers per week these individuals themselves experience
low income.  Additional to this we had 3 volunteers from S1-3
who had attended the holiday club in past years, 3 of them
signed up for their saltire award.   
All Children received breakfast and a 2 course hot home
cooked lunch. 
Children participated in a number of activities including, circus
skills, arts and crafts, board games & puzzles, bingo, and
quizzes. At the end of the week both groups of children went
on a bus day trip, Week one went to Byres’ farm and due to
the weather the second group of children went to the cinema
followed by Dominos Pizza. 
Many of the children had never been to byres farm or the
cinema, this was due to the rural setting of the farm and also
the overall cost of the activities especially now due to the cost-
of-living crisis. 
Additional Support: 
At the holiday club we were very fortunate to have support
from other local businesses.   
The Lossie football club donated the venue free of charge.
Salt cellar in Lossiemouth donated pizza and chips for all
children and staff at the holiday club, then invited all children
over to their ice-cream shack for a yummy free ice-cream.
Franny sweet creations also provide free sweet cone and a
voucher for each child to receive a free slush. The children
and volunteers were very excited and happy with the lovely
goodies. 
Asda community donated a huge toy hamper to go towards
prizes for the children, these went down well at our bingo and
quizzes. 
Page 237

Page 238

Tesco champion came along and volunteered her time for 3
days, brought along lovely exotic fruits for the children to try
and make “yummy” fruit kebabs. 
Moray Council CLD also provided us with a few members of
staff to come and support volunteers and children. The team
were great especially Tracey Robbie who provided the
children with some STEM activities, this went down a treat. 
Community day trip to Blair Drummond safari park. 
Due to the great support from the community business this
allowed to have some additional funds left over from the grant.
We then organised a free community family bus trip to Blair
Drummond safari park in Stirling. 
We were fortunate enough to have enough funds to run two
large coaches, allowing us space for 49 adults and 71
children. All families were on low income and many
experiencing challenging times due to the cost-of-living crisis.
We set of from Lossiemouth at 6am and returned at 8pm. We
choose this destination as many of our families could never
afford to travel this distance and many do not have a car so
would be limited to gain access. 
Quotes from families. 
Single mum of two. 
“Thanks for letting us for joining your trip, my daughter loved
every minute of it, she would have never of had this chance to
go to the safari if it wasn’t or this trip”. 
Working family of 4, (in work poverty)
“Thank you for an amazing day out, we loved every minute of
it, thank you for organising such a fab day”. 
Family 3.
“Thank you for a fantastic day. We haven’t been able to take
my daughter out all summer and to see the smile on her face
today was fantastic, she has been apprehensive about starting
high school, this trip definitely helped.” 
Fika Child and
Family Centre
1. Number of participants that benefitted from the 
additional funding (and if possible the number from low 
income families if this is different) 
40 places provided and all from low income families 
2. What types of activity were undertaken from the 
additional funding (inc transport/food etc) 
They participated in our Summer Camp, which involved 
outdoor trips, visits to local organisations, eg Police 
Scotland, fire service and museum, outdoor games in
Page 238

Page 239

the cooper park, arts activities in the centre and lots of 
bouncy fun with our inflatables and lots more 
3. How you targeted priority families/individuals from low 
income families to access this additional funding 
We advertised on social media 
Children 1st  There were 48 adults and 70 children who benefitted from our
holiday programme.  As we are a targeted family support
service, all families who attended are already linked with our
service.  Families are mostly linked with our service through
partner agencies, such as social work and health.  Programme
was as follows 
4 July Young Peoples group – Fochabers outdoor play area
with lunch/transport for all 
11 July Teddy Bears Picnic – picnic food and picnic blankets
provided/transport for families who needed it 
18 July Young peoples group – Ten pin bowling with
lunch/transport for all 
23 July Dads n bairns group – Rainbow castle soft play area
with lunch/transport for all 
26 July Young Peoples group – Earthtime outdoor play
session 
31 July Birth parents group day out – Farm day out and
lunch/transport for all 
27 July Family BBQ and Beach – Roseisle, Food provided,
transport for families who needed it 
Feedback (all names have been changed for confidentiality)
Thanks again for an awesome day, the kids had a ball – mum
Lovely to be invited and get a chance to meet other people,
we really enjoyed it – dad 
Bobby enjoyed our day out and we’re going to start coming to
the group – dad 
I made a new friend – child 
We didn’t want to leave – young peoples group 
Page 239

Page 240

Speyside
Children’s Arts
Festival
• Number of participants that benefited from the additional
funding (and if possible the number from low income families if
this is different) 
The total number of participants that benefited from the
additional funding was 93.  We are able to confirm that of the
93 participants at least 49 were from low income families. 
• What types of activity were undertaken from the additional
funding (inc transport/food)
We prioritised our funding allowance towards providing a free
meal ticket for attendees at Speyside Children's Arts Festival. 
• How you targeted priority families/individuals from low
income families to access this additional funding
As our attendees arrived at the front desk of the Speyside
Children's Art Festival our volunteers were able to verbally
inform the attendees that we were offering a free meal ticket to
children/young people and families that were from a low
income background.  This allowed us to directly target low
income families.  The families were then given a special
coloured ticket, which could be taken to Mother Goose
catering van, where they would receive a free hot meal, either
meat or vegetarian. 
• Any other pertinent information you wish to share
I would like to further explain the number of participants that
benefited from the additional funding that we received.  As
previously explained we were able to monitor the number of
children and young people who handed in a coloured ticket to
indicate that they were to receive a free hot meal, 49 recorded
by Mother Goose catering.   We also distributed meal tickets
to adults, to include the artists and volunteers, 44 recorded by
Mother Goose.   We are unable to confirm the amount of low
income adult meals we provided as some may have been
parents from low income families.  We are also aware that
some of our artists, volunteers and staff are from low income
families, however we do not have exact data on the numbers.  
We would have the capacity to gain this information if this is
required. 
Moray Sports
Centre
Number of participants that benefitted from the additional
funding (and if possible the number from low income families if
this is different) 
14 Low Income 
What types of activity were undertaken from the additional
funding (inc transport/food etc) 
81 Lunches – These were in the form of lunch boxes with a
ham/cheese sandwich, juice box and a chocolate bar. 
Page 240

Page 241

Tennis, Badminton, Basketball and Football.    
How you targeted priority families/individuals from low-income
families to access this additional funding 
Through our local primary school at Linkwood. The
headteacher emailed all the low-income families in the area. 
Any other pertinent information you wish to share. 
In the future we will limit the amount of funding per child to 2
weeks’ worth as our spaces went extremely fast and we had
lots of children asking to book once the funding had run out. 
Arrows - Number of participants that benefitted from the additional
funding (and if possible the number from low income families if
this is different) 
44 children benefitted from the activities and 23 families
attended the day trips to Infinity trampoline park, crazy golf
and whim park and Kincraig wildlife park. 
Of the 23 families, 3 are working and not in receipt of any
benefits and 20 are from low income families or families
whose sole income is from benefits.  3 of the families are
kinship carers and 17 from single adult families. 
- What types of activity were undertaken from the additional
funding (inc transport/food etc)
The funding was used to pay admission fees to Infinity
trampoline park, crazy golf and Kincraig, pay for bus transport
to activities, hire of facility for art & craft and sports and games
week, food and snacks, equipment for sports & game activities
and art & craft activities.   
- How you targeted priority families/individuals from low
income families to access this additional funding
A lot of the families that we support are from families who are
either solely in the receipt of benefits or from low income
families, so did not need to target families. 
- Any other pertinent information you wish to share
Thank you so much this has made such a difference to the
families, some of the children stated that they did not have any
trips or outings apart from what they attended that we
provided.    We had expected more families and children to
attend, but we had some cancellations on the day.  We
provided transport to collect families from Buckie, Kinloss,
Forres and Elgin, as we have found in the past that getting
Page 241

Page 242

organised and transport to collection point for trips and arts &
crafts and games & sports activities. 
Outfit Moray •Number of participants that benefitted from the additional
funding (and if possible the number from low income families if
this is different)
114 Young people signed up to take part. (all low income)
18 activity days
Packed lunches were provided with all activities 
•What types of activity were undertaken from the additional
funding (inc transport/food etc)
Outdoor Activities Archery, Bush craft, Coasteering,  Climb &
Abseiling, Gorge walking, Paddle Boarding, Kayaking 
•How you targeted priority families/individuals from low income
families to access this additional funding
Outfit Moray Mailing list
Partners
Word Of Mouth 
•Any other pertinent information you wish to share
Funding came in too late to target provision with schools to
make sure the most in need young people were participating. 
This funding needs to be made available 8-10 week prior to
the school holiday to allow appropriate capacity/ staffing to be
in place and  to ensure the most vulnerable and
disadvantaged young people are targeted through schools.
Elgin Youth
Development
Group
- Number of participants that benefitted from the additional
funding (and if possible the number from low income families if
this is different)
We had 167 young people participate in activities over the
summer holidays, allowing 59 new P7’s to participate. 37 of
these are known to be from low-income families, 10 of these
we are sure are from low-income families and the remaining
13 are unknown at this moment. 
- What types of activity were undertaken from the additional
funding (inc transport/food etc)
Activities include bus tips to Cadonas in Aberdeen, Beach
BBQ’s, Crazy Golf, and bowling in Inverness, Youth Drops ins,
and craft sessions. This funding was used to provide transport
buses and admission tickets. We added extra spaces as well
as 6 extra activities. 
During all our trips using the funding we were able to provide a
hot breakfast and a lunch for all day trips. Additional spaces to
our free lunch session. As well as additional spaces to our
Foodie Fridays in our building and in local parks. 
Page 242

Page 243

- How you targeted priority families/individuals from low-
income families to access this additional funding
We were able to target mainly from our current membership
and promotion. We also worked with some partner agency to
help share the information wider. 
- Any other pertinent information you wish to share.
Our only comment was that this kind of funding is very much
needed for all holiday programs throughout the year especially
not only targeted to primary school age. We have seen a
massive rise in Secondary school low income families
struggling due to the larger appetites in secondary school
young people. As well as a continuing decrease in activities
for Teenagers in holiday times. 
Fochabers
Petanque and
Fochabers
Bowling Clubs
Bowls
-10 children (9 families, 16 people, 1 x Households with a
disabled adult or child)
-Bowls session at the club – bought 3 x sets of junior bowls 
Petanque
- 9 Children (16 people) x 2 session
-Petanque session at HS delivered by the club – bought 3 sets
of indoor petanque balls
-Info went to Children 1st, Social Workers, to Laura Russell to
share around networks, Milne’s emailing list, on our
Fochabers Facebook page. 
A few families have inquired about their club sessions and
want to join.
These sessions were brilliant! Both clubs absolutely chuffed
and want to deliver more in the area. Thank you so much! 
Buckie High
(Raising
Attainment)
- Number of participants that benefitted from the additional
funding (and if possible the number from low income families if
this is different)
15 children attended the Parkour workshops.
10 of these children were from low income families. 
- What types of activity were undertaken from the additional
funding (inc transport/food etc)
Eight hourly sessions of Parkour training and activities was
provided by a registered local trainer. The children learned the
seven core skills of Parkour e.g flipping, climbing, balancing
etc. and were provided with a certificate at the end of the
course. The sessions were held in the local high school gym.
Drinks and snacks were provided. 
- How you targeted priority families/individuals from low
income families to access this additional funding.
Page 243

Page 244

My role is Principal Teacher of Raising Attainment (Inclusive
Transitions). I work with all eight primaries in the ASG and
target children with a poverty-related attainment gap for
intervention. Although I am relatively new in post (3 ½ 
months), I am starting to work with these children and their
families. On being given the funding, I wrote to families to offer
them the free classes. The rest of the children who came were
friends of the children / families but all were of primary age. 
- Any other pertinent information you wish to share.
The sessions were really good for the children who came. On
the feedback forms I distributed at the end of the course, the
children said that they enjoyed the Parkour sessions, rating it
a 9 or 10 out of 10. They also said that they had learned new
skills and that the sessions had made them feel more
confident about trying new things. All of them said that they
would like more sessions in the future. 
Moray School
Bank
We supported 185 people - 109 children & 76 adults (all in
financial hardship) over the summer. 
With the funding we provided travel via our minibus, entry to
multiple activity parks such as Landmark, The Highland
Wildlife Park & Wynford Farm, Lunches, and money to the
children on our trips to spend in the gift shops. 
We targeted the families we support by advertising our trips on
social media to these families and referring those being
supported by Moray School Bank. 
Street Football 71 participants ranging from Primary 6 – Secondary 6.  Four
sessions were delivered across various locations in Elgin that
were promoted on social media and were free to all
participants. 
Libraries &
Learning
Centre Team
Summer Digi Sessions 2023 Funding
Number of participants that benefitted from the additional
funding (and if possible the number from low income families if
this is different)
Event         No of       No of        No of Adults Total 
Sessions   Children                          Attending
Digi Drop In 15     406    204               610
Booked Digi 15      88              54               142
Sessions
Totals            30     494             258               752 
Types of activity were undertaken from the additional funding
(inc transport/food etc)
The Learning Centre staff facilitated 15 Digi Drop In sessions
across 8 of our branch libraries during the 6 week school
Page 244

Page 245

holiday period and an additional 15 bookable sessions (with
age recommendations) in Elgin Library.   
We were also able to assemble and distribute 4 different Digi
Kit Boxes to Buckie, Forres, Keith and Lossiemouth Libraries
to add value to their own summer activities programmes.
At each session we were able to provide refreshments for
participants, including drinks, snacks and fruit.
How you targeted priority families/individuals from low income
families to access this additional funding 
Staff in the Learning Centre, Elgin Lending and in the
branches approached any customers who they felt would
benefit from taking part in the digi sessions to make them
aware of our offer. 
Details of the digi sessions taking place in Elgin Library were
printed on the back of the Summer Activities flyer that was
handed out to library customers in Elgin and made available to
partners, including the Adult and Family Learning team. 
We contacted families who had previously been referred to
Learning Centre projects by Social Work and Education
partners, to offer them places on the booked sessions and
make them aware of the drop in sessions. 
We promoted the sessions on our own social media channels,
and our partners in the Digital Learning Team advertised the
sessions on their platform too. 
We delivered 2 sessions at The Bosie, Moray Food Plus’
family centre, on Elgin High Street. 
Any other pertinent information you wish to share
The funding allowed us to purchase new and additional digital
resources that we will continue to use across the Library
Service moving forward, affording greater diversity and range
to our digital offer. 
The funding allocation to cover additional staff hours allowed
us to deliver more sessions in more locations, and this was
much appreciated by staff and participants, especially in the
smaller branches that we would otherwise have been unable
to accommodate. The Burghead Library session, for example,
attracted 42 children and 21 adults! This has helped to raise
the profile of Moray Libraries in these communities and has
allowed Learning Centre staff to gauge demand/topics of
interest that will inform future delivery scheduling. 
Feedback overall was excellent, and the refreshments
provided were welcomed and appreciated by participants.
Page 245

Page 246

Moray
Women’s Aid
The number of participants we had whom attended our trip
was 45 this included 18 Adults and 27 children, this was the
expected number we had attending due to bus hire size. 
All our families who attended were from low-income
households, therefore 18 families benefited from our planned
outing. 
Our families attended our outing to Landmark Forest
Adventure Park. Through the funding we were able to pay for
transport, tickets, snacks and were also able to provide lunch
for our families. They were able to take part in all the
outdoor/indoor activities that landmark provides from walks to
water slides and tree top trails. 
We were able to facilitate this outing to our families from
various locations in Moray such as Elgin, Buckie, Forres and
Lossiemouth. 
Forres Osprey
Bus Summer
Holiday Club
1) 96 participants with a total of 48 families attended our 
trips.
2) All of these families are low income
3) Activities included cinema trips, bowling, aquarium, 
trampolining, Landmark, High ropes. Trips included the 
transport, entrance costs and lunch.
4) We advertised trips through social media, took referrals 
from Children 1st, social work and the headteachers of 
local schools.
5) Some feedback from our trips: 
“seeing her smile with seeing all the faces of the fish, being
able to spend time as a family”
“meeting people in similar situations as us” 
Wild Things No evaluation report submitted as yet.  Funding has not been
released until evaluation report submitted. 
The Loft Youth
Project
•  We provided 28 (2 groups x 14) young people aged 10
-12 years a beach trip which included transport, youth
work staff hours, BBQ & refreshments all included. 
• BBQ in the park on 4 Friday evenings, we catering for
approx 12 more young people each session with this
funding.
• We were also able to provide more
snacks/refreshments throughout the holidays. 
• We have already established relationships with families
from low income therefore were can target and
prioritise these families.
Page 246

Page 247

Army Welfare
Community
Services
Additional group  (8) Kayaking 10th July plus lunch 
Additional Group (8) Coasteering 13th July plus lunch
Additional Group (8) Rafting plus Lunch
Additional 2 groups (16) Kayaking plus Lunch 21st July
Additional 2 groups (16) Gorge Walking 3rd August plus
Lunch
Additional Group (8) Climbing plus Lunch 7th August
Additional 3  (24) groups Rafting plus Lunch 9th August 
Additional Lunches for 40 Children on Wild Things Activity
BBQ Lunches for 54 alongside On Site Activities 
Additional 8 places on Residential Cromdale 7-9 August 
Moray Flying
Circus
- Number of participants that benefitted from the additional
funding (and if possible the number from low income families if
this is different) 
8 participants on the course benefitted from the funding. All
were from low-income families. (6 received fully or partially
funded places on the summer camp, 2 received free places on
taster sessions). 
Around 30 people attended a free drop-in circus-skills session.
We do not know how many of these were from low-income
families. 
- What types of activity were undertaken from the additional
funding (inc transport/food etc) 
3 participants received fully funded places on the course. 3
participants received partially funded places on the course. All
of the participants from low-income families were offered free
lunches (to be paid for by the funding). All participants from
low-income families were offered for transport costs to be
covered. 1 participant accepted funding to cover their travel
costs. Funding covered additional healthy snacks to be made
available to all 14 participants (6 of whom identified as being
from low-income families). 
We also offered free places on taster sessions for children and
adults from low-income families. 2 free places were taken
(both by primary-aged children from low-income families). 
Due to the lack of uptake for funded lunch provision, we were
able to reallocate this money to offer a circus-skills drop-in
afternoon for free (previously we have had to charge for this to
cover costs). Around 30 people attended the free session. We
do not know how many of these were from low-income
families. 
- How you targeted priority families/individuals from low
income families to access this additional funding
Page 247

Page 248

We re-advertised the course across social media and our
newsletter, and included clear information that subsidised
places were available for low-income families, and that lunch
and travel costs could be covered by the funding. On
Facebook, we shared posts about the subsidised places and
offer of lunch/transport fees within groups where we might
reach more low-income families - this included groups like
'Moray Mums and Dads' and 'What's On Moray'. We were also
able to directly contact families who had reached out to us
about the course, but who had previously been unable to
afford it. 
We advertised free places on the taster sessions for low-
income families in the same way, as well as the free circus-
skills drop-in afternoon. 
- Any other pertinent information you wish to share
A number of participants who received fully or partially funded
places on the course remarked that they would have been
unable to attend without the funding, and were hugely grateful
to have been given the opportunity to attend. We were
delighted to be able to offer subsidised places on the course,
and would like to thank Moray Council for helping make our
course accessible to more low-income families. 
Thanks again for including Moray Flying Circus in this funding
- it made a huge difference to the children who took part.
New Elgin East
Community
Planning Group
49 families from the Elgin High ASG area registered for the
Monday Family Fun sessions, advertising on local notice
boards and shops and also shared with the schools prior to
the summer break, with such an large response after just 3
days we closed the google form for registration.  We decided
to offer 2 sessions, on dates suitable to them, to each family
who registered so that everyone had the opportunity to come
along and a quality experience from the session.   
The additional funding then allowed us to offer further
sessions to families who had attended already, it was
recognised that this would be more beneficial than re-opening
the registration. 
We had arranged for several workshops to take place over the
6 weeks; Sand Art, Sansum Blackbelt Academy, Zara
Mortimer Dance School, Oakwood Cookery School, Strathisla
Nerf Range and Speyside Falconry to attend and a lot of these
groups donated their time and resources for free to the group
and the others charged minimally to cover costs.  All the
activities were planned with families in mind, some activities
including the workshops were things low income families may
not be able to access or be able to afford, other crafts and
Page 248

Page 249

activities were simple, low cost and easily replicated at home
such as stone painting, games, scavenger hunts. 
With the uptake being greater than anticipated, the additional
funding allowed us to extend and enhance the other activities
and crafts to include another Sand Art session as it had been
hugely popular in the first week, we ordered Shrinkies and
Dream Catcher crafts along with replenishing other craft
supplies from Baker Ross and also were able to offer glitter
tattoos and face painting each week – which the kids loved!   
We also used the additional funding to run the Party night,
where all the families who had attended over the 6 weeks
were invited to come along.  We were able to supply some
additional Bingo prizes along with those that had been
donated and also we treated all the children to an ice cream or
slush from McKenzies Ice Cream Van that we booked to come
along as well as snacks and drinks we provided within the hall.   
As part of the Moray School Bank, It Takes A Village project,
we set up a pre-loved uniform rail within New Elgin Hall foyer
which allowed us to share and promote the option of next-to-
new school uniform and also to be able to promote our new
Pop-Up shop option at the St Giles Centre and be able to
engage with families about the Summer Campaign for
referrals for new uniform and shoes.  Offering this was a great
opportunity to engage with families about the work of Moray
School Bank and the services we offer and allowing parents
and carers to browse whilst the children were taking part in
activities in the hall too.   
In addition to the families who attended the sessions, we
accumulated 121 hours of volunteering opportunities for adults
and young people, all of who were from the New Elgin area
and Elgin High ASG, who were able to share skills and
experience and also gain new ones.  Some of those have
continued to volunteer in other sessions with Moray School
Bank and are keen to be involved with future community
projects. 
Feedback from the families was hugely positive, everyone
enjoyed the range of activities on offer and the opportunity to
meet new people and have something that was free to be able
to attend, when so many summer holiday activities are very
expensive.  The party night was a huge hit and people would
like to see more community events like this taking place! 
Autism &
Neurodiversity
North Scotland
- Number of participants that benefitted from the additional
funding (and if possible the number from low income families if
this is different).
Page 249

Page 250

• 19 individuals benefited from the additional funding, 15 of
them are low income families. 
- What types of activity were undertaken from the additional
funding (inc transport/food etc) 
• We went on a range of day trips. Transport was funded using
the funding, no families were invoiced for any travel expenses.
Lunches out were provided were possible. 
Trips included fruit picking, bowling, soft play, Gordon castle
and play area, sports halls, aquariums, farm trips, beach trips.
We enhanced indoor activities on our rainy days, really
focusing on the sensory needs for each individual person we
support. We were able to promote a range of different health
aspects including physical activity and healthy eating. We
were able to encourage and promote life skills, and of course
getting the people we support out in the community with
confidence. This can be a daily challenge for majority. 
- How you targeted priority families/individuals from low
income families to access this additional funding
• We made the use of activities, day trips, lunches, etc easily
accessible for all. This was so that nobody who may have feel
anxious or embarrassed to come forward and make use of
what was available. 
- Any other pertinent information you wish to share
• The money given to us for the summer made such a
difference to what we as an organization could provide for the
children and families we support. The relief on the faces of the
families when we informed them that everything throughout
the summer was covered. Their children were happy,
mentally, and physically stimulated, making friends and
exploring learning and developmental opportunities they are
not always able to.
TOTAL 
Moray Womens Aid (additional feedback);
Page 250

Page 251

Page 251

Page 252

Page 252

Page 253

Page 253

Page 254

Page 254