Education, Children's and Leisure Services Committee 
Wednesday, 19 April 2023 
NOTICE IS HEREBY GIVEN that a Meeting of the Education, Children's and
Leisure Services Committee is to be held at Council Chambers, Council Office,
High Street, Elgin, IV30 1BX on Wednesday, 19 April 2023 at 09:30. 
BUSINESS 
1 Sederunt 
2 Declaration of Group Decisions and Members Interests * 
3 Resolution
Consider, and if so decide, adopt the following resolution:
"That under Section 50A (4) and (5) of the Local Government
(Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Item 20-22 of
business on the grounds that it involves the likely disclosure of exempt
information of the class described in the relevant Paragraphs of Part 1
of Schedule 7A of the Act.”   
4 Minute of Meeting dated 25 January 2023 7 - 14
5 Written Questions ** 
6* Notice of Motion - Scottish Parliament Motion PE1979 15 - 16
7 Update Report - Inspection of Fostering, Adoption and
Adult Placements March 2022
Report by Chief Officer (Health and Social Care Moray)  
17 - 56
8 Children and Families Social Work Services Revenue
Budget Monitoring to 31 December 2022
Report by Chief Officer (Health and Social Care Moray)  
57 - 62
Page 1

Page 2

9* Education Resources and Communities Revenue
Budget Monitoring to 31 December 2022
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
63 - 68
10* Education Revenue Budget Monitoring to 31 December
2022
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
69 - 74
11* Analysis of Secondary School Leaver Attainment 2021-
2022
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
75 - 88
12* Education Scotland Inspection of St Peters RC Primary
School
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
89 - 98
13* Education Scotland Inspection of St Peters Nursery,
Buckie
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
99 -
102
14* Education Resources, Communities and Education
Capital Budget
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
103 -
116
15* Review of Additional Support Needs Service (Action
Plan 2023-24)
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
117 -
124
16* Learning Estate - Closure of Inveravon Primary School
Statutory Consultation Report
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
125 -
270
Page 2

Page 3

17* Moray's Dandelion Project
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
271 -
276
18* Partnership Community Learning and Development Plan
Update
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
277 -
296
19 Question Time ***
Consider any oral question on matters delegated to the Committee in
terms of the Council's Scheme of Administration. 
Item(s) which the Committee may wish to consider with
the Press and Public excluded   
20* Early Learning and Childcare - External Consultation
Update
• Information relating to staffing matters; 
21* Youth Music Initiative Programme
• Information relating to staffing matters; 
22 Scottish Child Interview Model - Social Work Staff
• Information relating to staffing matters; 
Information Reports - Not for Discussion at this Meeting
Any member wishing to call in a noting or information report from one
meeting shall give notice to Committee Services at least 48 hours
before the meeting for which the report is published. The Notice shall
be countersigned by one other elected member and shall explain the
reason for call in including any action sought. 
Information Report - Primary 1 Deferral and Early
Learning and Childcare Eligibility
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
297 -
300
Page 3

Page 4

Information Report - Singleton Inspections of Early
Learning and Childcare Centres - Published Reports
June 22-March 23
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
301 -
312 
ECLS Committee Action Table 313 -
314 
Only items marked * can be considered and determined
by all members of the Committee   
Summary of Education, Children's and Leisure Services
Committee
To exercise all the functions of the Council as Education Authority
within the terms of relevant legislation with regard to school education,
nurseries and child care, Gaelic, children’s services, leisure, libraries
and museums, sport and the arts, CLD, life long learning, youth justice
and child protection.         
Page 4

Page 5

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how
the individual or members of the group will vote on any item(s) of business on
the Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any
relevant and competent business within the specified remits not already on the
agenda, to the Chair provided it is received by the Proper Officer or Committee
Services by 12 noon two working days prior to the day of the meeting.  A copy
of any written answer provided by the Chair will be tabled at the start of the
relevant section of the meeting.  The Member who has put the question may,
after the answer has been given, ask one supplementary question directly
related to the subject matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the
consent of the Chair. If a Member does not have the opportunity to put a
supplementary question because no time remains, then he or she can submit it
in writing to the Proper Officer who will arrange for a written answer to be
provided within 7 working days. 
*** Question Time - At each ordinary meeting of the Committee ten minutes will be
allowed for Members questions when any Member of the Committee can put a
question to the Chair on any business within the remit of that Section of the
Committee.  The Member who has put the question may, after the answer has
been given, ask one supplementary question directly related to the subject
matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than ten minutes
after the Committee has started on the relevant item of business, except with
the consent of the Chair.  If a Member does not have the opportunity to put a
supplementary question because no time remains, then he/she can submit it in
writing to the proper officer who will arrange for a written answer to be provided
within seven working days. 
Page 5

Page 6

THE MORAY COUNCIL 
Education, Children's and Leisure Services Committee 
SEDERUNT 
Councillor Kathleen Robertson  (Chair)
Councillor Bridget Mustard  (Depute Chair)  
Councillor James  Allan  (Member)
Councillor Neil Cameron  (Member)
Councillor Tracy Colyer  (Member)
Councillor John Cowe  (Member)
Councillor Juli Harris  (Member)
Councillor Sandy Keith  (Member)
Councillor Scott Lawrence  (Member)
Councillor Marc Macrae  (Member)
Councillor Paul McBain  (Member)
Councillor Shona Morrison  (Member)
Councillor Derek Ross  (Member)
Councillor Sonya Warren  (Member)
Councillor Ben Williams  (Member)  
Mrs Sheila Brumby  (Non-Voting Member)
Mrs Anne Currie  (Non-Voting Member)
Mr Alfie Harper  (Non-Voting Member)
Reverend Tembu Rongong  (Non-Voting Member)
Mrs Susan Slater  (Non-Voting Member)
Ms Angela Stuart  (Non-Voting Member)
Mrs Emma Tunnard  (Non-Voting Member)
Clerk Name: Tracey Sutherland
Clerk Telephone: 07971 879268
Clerk Email: committee.services@moray.gov.uk 
Page 6

Page 7

MORAY COUNCIL 
Minute of Meeting of the Education, Children's and Leisure Services
Committee 
Wednesday, 25 January 2023 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor James  Allan, Mrs Sheila Brumby, Councillor Neil Cameron, Councillor
Tracy Colyer, Councillor John Cowe, Mrs Anne Currie, Councillor Juli Harris,
Councillor Sandy Keith, Councillor Scott Lawrence, Councillor Marc Macrae,
Councillor Paul McBain, Councillor Bridget Mustard, Councillor Kathleen Robertson,
Reverend Tembu Rongong, Councillor Derek Ross, Mrs Susan Slater, Ms Angela
Stuart, Mrs Emma Tunnard, Councillor Sonya Warren, Councillor Ben Williams 
APOLOGIES 
Mr Alfie Harper 
IN ATTENDANCE 
Also in attendance at the above meeting were the Depute Chief Executive
(Education, Communities and Organisational Development), Head of Education,
Head of Education Resources and Communities, Head of Governance, Head of
Environmental and Commercial Services, Strategy and Performance, Quality
Improvement Managers, Early Learning and Childcare Manager, Senior Project
Manager (Learning Estate), Catering Officer and Tracey Sutherland, Committee
Services Officer.   
1.         Chair 
The meeting was chaired by Councillor Kathleen Robertson. 
2.         Tribute 
The Committee joined the Chair in paying tribute to Robbie Burns as the
Committee was being held on the Bard's birthday. 
3.         Declaration of Group Decisions and Members Interests 
In terms of Standing Order 21 and the Councillors’ Code of Conduct, Councillors
Robertson and Mustard declared an interest in the Music Tuition Information
Report and confirmed that they would remain in the meeting and would review
their decision depending on how the discussion of the item progressed.  
Item 4
Page 7

Page 8

There were no other declarations from Group Leaders or Spokespersons in regard
to any prior decisions taken on how Members will vote on any item on the agenda
or any declarations of Member’s interests in respect of any item on the agenda. 
4.         Resolution 
The meeting resolved that in terms of Section 50A (4) and (5) of the Local
Government (Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Items 17-19 of business on the
grounds that it involves the likely disclosure of exempt information of the class
described in the relevant Paragraphs of Part 1 of Schedule 7A of the Act.  
Para Number of
the minute  Para Number of Schedule 7a 
17
Para 4
Information relating to any applicant or recipient of any
financial assistance provided by the Council 
18
Para 8 and 9
Information on proposed terms and/or expenditure to be
incurred by the Authority 
19
Para 9
Information on proposed terms to be proposed by or to the
Authority 
5.         Minutes of meeting of 2 November 2022 
The minute of the meeting of the Education, Children’s and Leisure Services
Committee dated 2 November 2022 was submitted and approved.    
6.         Minutes of special meeting of 7 November 2022 
The minute of the Special meeting of the Education, Children’s and Leisure
Services Committee dated 7 November 2022 was submitted and approved.    
7.         Minutes of special meeting of 14 December 2022 
The minute of the Special meeting of the Education, Children’s and Leisure
Services Committee dated 14 December 2022 was submitted and approved.    
8.         Written Questions 
The Committee noted that no written questions had been submitted.    
9.         Free School Meals Allowance Secondary Pupils 
A report by the Depute Chief Executive (Economy, Environment and Finance)
informed the Committee of the current process of when the free school meal
allocation is added to pupil's accounts and approve the plan to alter the timing of
the allocation.
Page 8

Page 9

In welcoming the report Councillor Warren, sought confirmation that when the
contract is renewed Officers to take into consideration the flexibility of any new
system purchased.  
The Head of Environmental and Commercial Services confirmed that this would be
taken into consideration when looking at new systems.  
Following consideration the Committee agreed to: 
i) note the contents of the report; 
ii)  approve the change to the timing of the allowance as set out in paragraph
7.3 Option 2; and    
iii) consider a more flexible system when the contract is being renewed.    
10.         Kings Coronation Bank Holiday May 2023 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) asked the Committee to give authorisation to submit
a request to the Scottish Government for permission for all schools across Moray
to reduce teaching days by one from the requirement to provide 190 days
schooling to 189 in order to recognise the additional bank holiday on Monday 8
May 2023 to the mark the celebration of His Majesty’s Coronation.  
Following consideration the Committee agreed to:  
i)  seek an exemption from the Scottish Government for the requirement to
provide 190 days schooling and seek consent for the exceptional closure of
all Moray schools on Monday 8 May 2023, under the terms of section 133 (4)
of the Education (Scotland) Act 1980 in order to recognise the additional
Bank Holiday on Monday 8 May 2023 to the mark the celebration of His
Majesty’s Coronation; and      
ii)  note that this request will be triggered only if the Corporate Committee on 31
January 2023 determines that an additional day of service closure and
annual leave be granted across the Council. 
11.         Initial Analysis of Achievement of Curriculum for Excellence Levels
2022 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) provided Committee with a summary of the Moray
data collected in June 2022 and provided to the Scottish Government at the end of
October 2022 regarding Teacher Professional Judgements (TPJ) on children
Achieving Curriculum for Excellence levels (ACEL) at P1, P4, P7 and S3.  This
data appears in the Scottish Government report published in December 2022.  
In introducing the report, Stewart McLauchlan, Quality Improvement Manager
advised the Committee that recommendation (iv) should read 'a further paper to be
presented to the next meeting of this Committee with further information on how
Page 9

Page 10

the direct allocation of additional Scottish Government funding for additional
teachers, for the priority of raising attainment, could be allocated.'  
Councillor Ross asked whether there was any evidence that would support the
reduction in class sizes and improvements in attainment.  
In response the Head of Education confirmed that this was not information that the
Council held and that although maximum class sizes are set nationally there is no
specific data.  
The Depute Chief Executive (Education, Communities and Organisational
Development) further added that any information on class sizes currently published
is more general and the validity of the information available would need to be
determined.  
Councillor Macrae proposed adding a further recommendation in which the Chair
of the Committee could write to the  Secretary for Education to request information
on the effects of class sizes on attainment that the Scottish Parliament Information
Centre may hold.  
The Chair confirmed that she was happy to write the letter.  
Following further lengthy discussion and consideration the Committee agreed:  
i)  scrutinises and notes the content of this report and acknowledges the
lasting impact of Covid-19 and wider influencing factors on work of Moray
schools to close the poverty related and wider attainment gaps      
ii)  acknowledges work underway by Education using resources available to
support in addressing identified areas of underperformance and improve
outcomes for all children and young people 
iii)  notes revised ACEL and wider Stretch Aims set using available data
intelligence as part of the Scottish Government and Education Scotland
Framework for Recovery and Accelerating Progress requirements;    
iv)  a further paper would be presented to the next meeting of this Committee
with further information on how the direct allocation of additional Scottish
Government funding for additional teachers, for the priority of raising
attainment, could be allocated; and    
v)  the Chair to write to the Secretary for Education to request information on
the effects of class sizes on attainment that the Scottish Parliament
Information Centre may hold     
12.         Education Professional Leadership and Learning Strategy 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) asked the Committee to agree the updated
Professional Leadership and Learning Strategy.  
Following consideration the Committee agreed the Professional Leadership and
Learning Strategy.
Page 10

Page 11

13.         Parental Invovlement and Engagment 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) invited the Committee to note the statutory
requirement for local authorities to have a Parental Involvement and Engagement
Strategy and to request approval of the draft Moray Parental Involvement and
Engagement Strategy 2023-2025.  
Following consideration the Committee agreed to approve the Moray Parental
Involvement and Engagement Strategy 2023-2025. 
14.         Information Report - Primary and Secondary School Functional
Capacity 2022-23 
Under reference to Standing Order 38 Councillor Lawrence seconded by
Councillor Warren called the report in to ensure the Committee have evidence to
make decisions around budget and are able to consider learning estate issues with
full information.  
Following consideration, the Committee noted the report.    
15.         Information Report - Music Instruction and Performance Update 
Under reference to Standing Order 38 Councillor Warren seconded by Councillor
Lawrence called in the report to get more information about music based work and
more information about how this works going forward and budget issues.  
Following consideration, the Committee noted the report.    
16.         Question Time 
Under reference to paragraph 4 of the minute of the meeting of 7 November 2022,
Councillor Warren sought an update on the funding bids to the Scottish
Government and the timeline for parental consultation.  
In response, the Head of Education Resources and Communities confirmed that a
response from the Scottish Government is expected at the end of January 2023
and members will be notified in due course.  With regards to the consultation, it will
be carried out in line with the previously published timeline and it is anticipated to
begin towards the end of the current quarter.  
Under reference to paragraph 18 of the minute of the meeting of 14 December
2022 sought an update on the Service Level Agreement between Moray Leisure
Centre and the Council.  
In response, the Head of Education Resources and Communities stated that she
did not have an update but would follow up on the issue following the meeting.  
Under reference to paragraph 21 of the minute of the meeting of 14 December
2022 Councillor Warren sought an update on whether the costs for the January
and April intake were now available.
Page 11

Page 12

In response the Early Learning and Childcare Manager confirmed that the
information was included in a report going to Moray Council on 2 February 2023.  
Under reference to paragraph 23 of the minute of the meeting of 14 December
2022 sought an update on the Aberlour Infrastructure Project.  
In response the Early Learning and Childcare Manager confirmed that meetings
had taken place with Ward members and parents had been written too.  Other
options are being investigated including, phasing the work and considering an
alternative location for the outdoor nursery at Craigellachie Primary.  
She further added that the project is still working within the original £900k budget.  
Councillor Allan updated the meeting on a recent visit to Hersbruck in
Germany.  He had attended a Scottish evening at the weekend, where the young
people from Hersbruck who had been involved in a visit to Lossiemouth celebrated
their recent visit and thanked the pupils from Lossiemouth High School and
Hythehill Primary for making them feel so welcome.  
He further added that the Mini Cooks initiative, he had previously informed the
Committee of, started on Monday 23 January 2023.  
Councillor Warren requested an update on services provided for developmental
nursery places particularly for children who progress to the basis at primary school
and how is the Council supporting children and families with complex needs in the
nurseries.  
In response, the Early Learning and Childcare Manager confirmed that the Council
currently has contracts with 2 developmental nurseries in Lossiemouth and Forres
and work is being carried out with Teddy Bear nursery in Cullen to become a
partner nursery.  
She further added that a large number of the other nurseries do accommodate
children with a high level of diverse need.  
Councillor Warren further sought clarification on whether the services were
available to all children until they reach the age of 5.  
The Early Learning and Childcare Manager confirmed that if it is appropriate for
the individual child to remain in the developmental nursery then the service is
available.  
She further added that the developmental nurseries work closely with the universal
nurseries and if they see that a child can transition to a mainstream nursery that
would then feed into a Primary School, the move would be supported as this then
helps to alleviate the pressures on the developmental nursery and allows them to
take children from a younger age.    
17.         Moray and Nairn Educational Trust - Disbursement 2022/23 [Para 4] 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) provided information and sought approval for the
Page 12

Page 13

payment plan to be used to assess applications to the Moray and Nairn
Educational Trust and to consider applications to the trust.  
Following consideration the Committee agreed to approve the grants at the rates
provided in the payment plan.   
18.         Learning Estate Strategy and Development Programme - Findrassie
Primary School [Para 8 and 9] 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) provided an update on the Findrassie Primary
School new build project and seeks a decision from Committee on how to proceed
based on the change in circumstances.  
Councillor Mustard proposed deferring the report for 6 months and bring back a
report to review the situation at that point.  
In response, the Depute Chief Executive (Education, Communities and
Organisational Development) confirmed that any decision to postpone or defer
would result in the Council being unable to meet the timescale requirements of the
LEIP2 funding and so unable to use that funding and confirmed that data will be
reviewed on a 6 monthly basis and reported to Committee on an annual basis as
part of an annual review of the learning estate plan that is being developed.  
Following the response from the Depute Chief Executive (Education, Communities
and Organisational Development), Councillor Mustard withdrew her amendment.  
Following consideration the Committee agreed to:  
i)  note the change in circumstances relating to projected pupil numbers and
the challenges impacting on the affordability and delivery of the Findrassie
Primary School new build project;      
ii)  note the range of possible options to mitigate the impact of the capital cost
increases to the Findrassie Primary School new build project;    
iii)  approve a deferment  in the Findrassie Primary School new build project for
a up to 5 years, accepting that the project would no longer meet the
Learning Estate Investment Programme (LEIP) Phase 2 qualifying criteria
and so would not be eligible for Scottish Government future revenue
funding;      
iv)  instruct Council officers to take forward planning for the rezoning of Elgin
Academy Associated School Group primary school catchment areas to
utilise the existing and future school roll capacity; 
v)  agree to seek the formal replacement of the Findrassie Primary School
project with the Elgin High School project as a Learning Estate Investment
Programme Phase 2 project and to continue negotiations with Scottish
Futures Trust and the Scottish Government Learning Directorate to secure
this; and      
Page 13

Page 14

vi)  note that update reports on the Learning Estate Strategy and delivery
programme will be brought to Education, Childcare and Leisure Services
Committee every 12 months. 
19.         Early Learning and Childcare - Lease Agreement and Shared
Property Costs Update 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development informed the Committee of the outcome of
consultation with private and third sector providers related to the proposed shared
property costs methodology and updated the Committee on lease agreement
progress for private and third sector Early Learngin and Childcare providers that
currently operate from Moray Council premises.  
Following consideration the Committee agreed:  
i) to note the updated status of lease agreements as outlined in Appendix 3. 
ii)  that any further partner nursery settings operating from council premises
that are in contract with Moray Council to provide funded ELC hours only to
children with Additional Support Needs (similar to Ladybird Development
Group) be offered a lease at a nominal rent of £1 per annum and no share
of property running costs;    
iii)  to note the options highlighted in Appendix 1 for approaches to shared
property costs and agrees that shared property costs be introduced through
a gradual increase in these costs starting in Year 3 of the lease agreements
(August 2023) and increasing by 25% increments throughout each
remaining year of the lease agreements until 100% of the costs are reached
based on benchmarking the costs against average commercial rates within
Moray; and    
iv)  to note the outcome following further consultation exercises with private and
third sector Early Learning and Childcare (ELC) providers regarding shared
property costs as outlined in Appendix 2. 
Page 14

Page 15

NOTICE OF MOTION TO EDUCATION, CHILDREN’S AND LEISURE
SERVICES COMMITTEE ON 19 APRIL 2023 
Scottish Parliament Motion PE1979 
Committee notes and supports the proposals of Scottish Parliament motion
PE1979 [Establish an independent inquiry and an independent national
whistleblowing officer to investigate concerns about the alleged mishandling of child
safeguarding enquiries by public bodies - Petitions (parliament.scot)] calling on the
Scottish Parliament to urge the Scottish Government to launch an independent
inquiry to examine: concerns that allegations about child protection, child abuse,
safeguarding, and children’s rights have been mishandled by public bodies, including
local authorities and the General Teaching Council Scotland (GTCS); gaps in the
Scottish Child Abuse Inquiry; and establish an independent national whistleblowing
officer for Education and Children’s Services in Scotland to handle these enquiries in
the future. 
Committee notes that it has a statutory responsibility as a public body, in respect of
the safeguarding of children, young people and adults at risk. 
Committee is committed to ensuring an organisational culture which prioritises and
promotes the importance of safeguarding the welfare of children and adults at risk. 
Committee is committed to protecting children, young people and adults at risk from
abuse. 
Committee is committed to ensuring all Council policies and procedures pertinent to
statutory safeguarding responsibilities are designed, implemented, monitored and
audited in an open, transparent, democratically accountable way. 
Committee notes the remit and focus of the Scottish Child Abuse Inquiry, established
by the Scottish Government, has a remit to inquire into issues of historic abuse and
specific to children in care. 
Committee notes the Children and Young People’s Commissioner annual report
[CYPCS-AR-2022.pdf], and in particular work to improve child protection and
safeguarding (page 29). 
Committee supports calls for strengthening of accountability, oversight and public
scrutiny of systems for reporting disclosures to public bodies in Scotland, and how
disclosures are handled, investigated, reported and recommendations from reports
are implemented.
Item 6*
Page 15

Page 16

Committee welcomes the recent calls for the next phase of Scottish Child Abuse
Inquiry to look into concerns not yet investigated. 
PROPOSED BY COUNCILLOR MCLENNAN 
SECONDED BY COUNCILLOR WARREN 
Page 16

Page 17

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 19 APRIL 2023 
SUBJECT: UPDATE REPORT - INSPECTION OF FOSTERING,
ADOPTION AND ADULT PLACEMENTS MARCH 2022 
BY:   CHIEF OFFICER HEALTH AND SOCIAL CARE MORAY 
1. REASON FOR REPORT 
1.1 This report is submitted to the Education, Children’s and Leisure Services
Committee following an earlier report presented on 14 December 2022
regarding the inspection of Placement Services (fostering, adoption and adult
placements) by the Care Inspectorate in March 2022. The Education,
Children’s & Leisure Services Committee requested that an update report be
provided, in advance of the move to the Integrated Joint Board, regarding the
progress of the Service Improvement Plan. Members are asked to scrutinise
and note the information contained within. 
1.2 This report is submitted to the Education, Children’s and Leisure Services
Committee in terms of Section III (D) (2) of the Council’s Scheme of
Administration with regard to exercising all the functions of the Council as
Social Work Authority within the terms of relevant legislation with regard to
child support and protection, looked after children, fostering, adoption and
young people leaving care. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee scrutinise and note the outcome
of the improvement work following the inspection of fostering, adoption
and adult placements in March 2022. 
3. BACKGROUND 
3.1 Fostering, adoption and adult placements are inspected on a regular basis by
the Care Inspectorate with the previous inspection being undertaken in March
2019. The inspection in March 2022 was delayed as a result of Covid-19
pandemic. 
Item 7
Page 17

Page 18

3.2 For information, adult placements is a service where young people remain in
the same placement when they turn eighteen. This provides continuity and
stability for young people and supports better transitions from childhood to
adulthood.   
4. OUTCOME OF THE INSPECTION 
4.1 The Care Inspectorate provided initial verbal feedback on 18-March-2022.
Placement Services were provided with the draft inspection reports with an
opportunity to provide feedback to the Care Inspectorate prior to final
publication.     
4.2 The final reports are attached for the Fostering Service (Appendix 1) and the
Adoption Service (Appendix 2). 
4.3 The gradings provided by the Care Inspectorate were as follows:   
Quality
Indicator
Fostering Adoption Continuing Care
1.1 4 4 5
1.2 3 4 4
1.3 3 3 5
1.4 2 2 4
2.2 3 3 4
3.2 3 3 3
5.1 3 2 4 
4.4 The Care Inspectorate use a Six-Point Scale for grading as follows: 
Grading Description
6 Outstanding or sector leading
5 Major strengths
4 Important strengths, with some areas for improvement
3 Strengths just outweigh weaknesses
2 Important weaknesses - priority action required
1 Major weaknesses - urgent remedial action required 
4.5 The feedback from the Care Inspectorate was positive in relation to the staff
team and their commitment towards vulnerable individuals and families. It
highlighted that the voice of young people was heard and carers had a good
relationship with social work staff. The Care Inspectorate also highlighted
examples of particular good practice in adult placement services.
Page 18

Page 19

4.6 The Care Inspectorate identified that there was a culture of change in the
service and that it knew itself well and was clear about the areas that needed
development and improvement. The Care Inspectorate acknowledged that
Placement Services and, more widely, Children’s Services was going through
a period of change and undertaking a programme of transformation.   
4.7 However, there were a number of significant areas where the feedback was
poor and where, overall, Placement Services did not improve on its previous
inspection. 
4.8 There was a focus on inconsistent compliance with processes and procedures
which was resulting with delays in the permanence planning for children. In
the fostering team there were delays in progressing fostering assessments
and inadequate training for carers. It was identified that the team lacked depth
of experience which was amplified by recent high staff turnover. In the
adoption team the work with concurrency (fosters carers who then adopt) did
not reflect the best practice model and post adoption support required
significant development and improvement. 
4.9 In addition to this, the Care Inspectorate highlighted that the recent changes in
senior management and the amount of interim management posts had
resulted in uncertainty and drift in service development.               
4.10 The Care Inspectorate identified that it would be seeking an update on
progress which is likely to be in early to mid-2023.   
5. DEVELOPMENT AND QUALITY IMPROVEMENT 
5.1 As outlined in the report for the Education, Children’s & Leisure Services
Committee on 14 December 2022 the outcome of the inspection was not
unexpected. Quality assurance work was already underway prior to the
inspection in recognition of this. However, following the inspection a formal
Service Improvement Plan process was commenced which has been
supported by a fortnightly working group meeting. This is an ongoing project
whose scope ranges beyond the ‘Requirements’ and ‘Areas for Improvement’
identified by the Care Inspectorate.         
5.2 The working group reported to the Care Inspectorate in June 2022 on the
‘Requirements’ identified in the inspection reports. Following this, a review
was undertaken of the ‘Requirements’ and ‘Areas for Improvement’ identified
in the inspection reports in January and February 2023. This review was
included in the Service Improvement Plan where a summarised version is
attached to this report (Appendix 3).       
Page 19

Page 20

5.3 The Red Amber Green (RAG) rating definitions within the attached Service
Improvement Plan are outlined below. The RAG rating has been necessarily
cautious as there is a significant difference between an action being
implemented and it being embedded. As such, actions have only been RAG
rated as green if there is good evidence of it being embedded.       
RAG Rating Definition
Red Area shows no or limited progress
Amber Area shows progress but not fully embedded
Green Area shows good progress and is embedded 
5.4 The key areas of improvement activity are summarised as follows: 
Management stability 
5.5 There are no longer interim roles within Children & Families and Justice
Social Work. The previous interim Team Manager for Placement has returned
to her substantive role as Senior Social Worker for adoption and kinship care.
There is, therefore, currently a vacancy for a permanent Team Manager
where there is an active recruitment process. The appointment of a Team
Manager in Placement Services is central to the ongoing improvement work
where swift recruitment is critical. This has had an impact on progress and
previous recruitment adverts produced limited number of applicants. We have
now looked to address this, alongside the wider challenges to recruitment
across the department, and have created a recruitment plan. This issue is
pertinent across children and families social work nationally and it is
recognised that there are plans on a national basis to tackle this issue.
However, these will not provide solutions in the short term.   
Recruitment and retention of staff 
5.6 Following the inspection in March 2022 a number of members of staff left the
fostering team. As noted above, this is within the context of national
challenges in recruiting and retaining social work staff, particularly in the areas
of work with children and families. This situation created pressures for the
service and has had an impact upon the ability to progress some development
work. However, notwithstanding this, significant development work has taken
place. There has been a steady recruitment process in the fostering team
where it is expected to be fully staffed by May 2023. 
Training and induction for staff 
5.7 The retention of staff has been supported by an improved Placement Services
training schedule and induction process. The training schedule for 2023/24
Page 20

Page 21

has been completed and will be tracked on a monthly basis. The Policy Team
has also a significantly improved training programme which sits alongside the
Placement Services training schedule. The identification of training is
supported by all staff having had an annual appraisal. 
5.8 The progress of Life Story Work has not been as rapid as had been hoped.
There are in-house practitioners providing support and guidance alongside
newly purchased resources. A short life working group has been established
to embed current progress and identify future developments and actions.         
5.9 The induction process has been refreshed with the support of the Policy
Team. There is an improved core induction for all staff in Children and
Families & Justice Social Work. This is supplemented by specific induction
activity for staff from Placement Services.                   
Processes and procedures 
5.10 There has been considerable work in reviewing and re-writing the processes
and procedures in Placement Services. This has been collated in operational
documents for the teams and an updated LAC (Looked After Child) Manual
for all of Children & Families and Justice Social Work.     
5.11 Household Safer Caring Plans are in place for all foster placements. The
Young Person Safer Caring Plans have been completed for all those
assessed as high risk. The remaining Young Person Safer Caring Plans are
to be completed in the next 3 months. This has been a significant amount of
work as previously Safer Caring Plans were not consistently in place. The
staffing capacity in the fostering team has resulted in this task taking longer
than intended. However, this work is nearing completion where the
understanding that Household Safer Caring Plans and Young Person Safer
Plans are required is embedded with staff.             
5.12 Unannounced visits for foster carers has also been a challenge as a result of
staff capacity although good progress is being made.  The staff in the
fostering team fully understand the need for unannounced visits where this
has been part of development sessions. Currently, 65% of foster carers have
received an annual unannounced visit which demonstrates significant
progress. There is a schedule in place for the remaining unannounced visits
to be completed by the end of March 2023. Unannounced visits are a
standing item at every supervision and are monitored via a tracking
spreadsheet.         
5.13 A monthly Tracking Meeting is now in place to have oversight of data
spreadsheets. It was apparent that although a large amount of data was being
collected this sat across a number of spreadsheets which were not being
scrutinised effectively. The number of spreadsheets has been streamlined
Page 21

Page 22

where there is monthly monitoring by the Service Manager, Team Manager,
Senior Social Workers and Business Support Manager. 
Fostering & Adoption Panel 
5.14 All ‘Requirements’ have been fully implemented and embedded.   
Permanence planning 
5.15 Following the inspection there was a refresh of the Permanence & Care
Excellence (PACE) process which seeks to identify barriers to effective
permanence planning and how these can be resolved. The PACE working
group has reviewed the data and aims and is now tracking specific projects
which are intended to improve permanence planning. This is work over a long
time period where the impact of the projects upon practice and data will not be
evident for a number of months.         
5.16 Alongside the PACE working group there is the Permanence Tracking
Meeting (PTM) and the Placement Oversight Meeting (POM). These two
groups track the progress of individual young people thereby avoiding drift in
permanence. 
5.17 Together, these three meetings are providing valuable information and, at this
stage, have identified processes and individual cases where immediate action
has been required. The long term impact upon practice will not be known until
we have had fuller evidence over the next few months.             
Training for foster carers and adopters 
5.18 There was an area of improvement identified by the Care Inspectorate on
providing carers with improved training on child protection and managing
challenging behaviour. In addition to the current online training, Morag
Martindale (Self-Regulation Behaviour Management) and Kate Cairns training
suite, means carers now have access to online child protection training and in
person Behaviour Support Strategies (BSS) training as needed. There is
current exploration of introducing training by Dan Hughes (Playfulness,
Acceptance, Curiosity and Acceptance) for managing challenging behaviour.
This is starting with adopters and will move to include foster carers. It has
been identified that carers can join in person training run by Cala (in-house
children’s residential provision) where appropriate. 
5.19 There are now more comprehensive training options for carers. Training for
carers is being tracked via a spreadsheet and subject to monthly monitoring.   
Page 22

Page 23

Concurrency or dual approved foster carers/adopters 
5.20 The Care Inspectorate highlighted that concurrent carers (fosters carers who
then adopt) were not being supported as foster carers when undertaking the
fostering task prior to adoption. This has now been fully rectified and reflected
in concurrent carers now being described as dual approved foster
carers/adopters.   
5.21 Overall, there has been good progress in most areas in meeting the
‘Requirements’ and ‘Areas for Improvement’ identified by the Care
Inspectorate. There are no areas RAG rated as red where the areas requiring
improvement can, in part, be attributed to staff shortages through 2022 and
2023. However, Placement Services is approaching full staffing capacity
where the Service Improvement Plan working group is anticipating more rapid
progress.   
5.22 The ‘Requirements’ and ‘Areas for Improvement’ identified by the Care
Inspectorate will be subject to a second review process in late July 2023.   
5.23 The Service Improvement Plan is an ongoing project where the working group
will continue to meet on a fortnightly basis. It will now have a broader focus
and will support improvements in areas not specifically identified by the Care
Inspectorate, but where performance data, national policy developments and
carer feedbacks points to areas requiring attention.             
6. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP)) 
The work of Placement Services is underpinned by the Children’s Services
Plan with particular attention to Priority 4 “The outcomes and life chances of
looked after and care experienced children and young people are improved”.
This links in, and is consistent with, the wider Corporate Plan for Moray
Council.         
The work of Placement Services is sighted on and committed to upholding the
principles of keeping The Promise and the UNCRC Incorporation Bill. It is
seeking to develop its role in line with The Promise and the importance of
children’s rights particularly in regards to having a good childhood and to hear
the voice of children, young people and their families. There are no
contraventions of child’s rights to consider as part of this report. 
Page 23

Page 24

(b) Policy and Legal
Placement Services has statutory procedural guidelines in accordance with
Scottish Government guidance and regulations. 
(c) Financial Implications
There are no financial implications associated with this report.   
(d) Risk Implications
There are no specific risk implications associated with this report. 
(e) Staffing Implications
There are no staffing implications associated with this report. 
(f) Property
There are no property implications associated with this report. 
(g) Equalities/Socio-Economic Impact
There are no equalities/socio-economic implications associated with this
report. 
(h) Climate Change and Biodiversity Impact
None. 
(i) Consultations
Interim Head of Service, Panel Advisor, Chief Officer Health and Social Care,
Equal Opportunities Officer, Senior Human Resources Advisor, Principal
Accountant, Legal Services Manager and Committee Services Officer. 
7. CONCLUSION 
7.1 The purpose of this report is to request that the Committee scrutinise
and note the outcome of the improvement work following the inspection
of fostering, adoption and adult placements in March 2022. 
7.2 Placement Services is undertaking a process of learning and
improvement via the Service Improvement Plan overseen by the
associated working group. This work has been supported and
reinforced by the inspection in March 2022 of fostering, adoption and
adult placements. 
Author of Report: Carl Campbell, Service Manager, Children & Families and
Justice Social Work
Ref:  SPMAN-305227695-64 / SPMAN-305227695-63 / 
SPMAN-305227695-62 / SPMAN-305227695-61
Page 24

Page 25

MorMoraay Fy Fostostering Sering Serervicevice
Fostering Service
The Moray Council
Rose Cottage
PO Box 67
Elgin
IV30 9BX
Telephone: 01343 563 552
Type of inspection:
Announced (short notice)
Completed on:
18 March 2022
Service provided by: Service provider number:
The Moray Council SP2003001892
Service no:
CS2004082074
Item 7
Page 25

Page 26

About the service
Moray Fostering Service provides a fostering service for children and young people who are unable to live at
home. Inspections of an adult placement (continuing care service) and adoption service have been
undertaken and separate reports have been completed.
The service recruits and supports foster carers who provide care to children in need of alternative care.
It should be noted that this inspection took place during the Covid-19 pandemic restrictions and therefore
followed a revised procedure for conducting inspections in these circumstances. We spoke with the
management team, staff and other professionals and viewed evidence sent to us virtually. We made
arrangements to visit adoptive families and children in their homes.
What people told us
Children and young people told us about their positive experiences with foster carers and how they felt
included and supported in family life. Carers told us that they felt well supported by the current workers in
the fostering team but reflected that the service had been through a lot of change which had impacted on
the consistency of their support.
From this inspection we evaluated this service as:
In evaluating quality, we use a six point scale where 1 is unsatisfactory and 6 is excellent
How well do we support people's wellbeing? 2 - Weak
How good is our leadership? 3 - Adequate
How good is our staff team? 3 - Adequate
How well is our care and support planned? 3 - Adequate
Further details on the particular areas inspected are provided at the end of this report.
How well do we support people's wellbeing? 2 - Weak
We have evaluated this key question as weak as strengths are outweighed by significant weaknesses.
Children and young people experienced supportive and enduring relationships with Fostering families that
provided them with a sense of belonging. One young person told us 'I don't think of myself as a child in care
I feel like I'm someone that lives with my mother figure.....I'm closer to (carer) than I am with any other
family member'. We were confident that young people were experiencing love with their needs fully met by
committed Fostering families.
Inspection rInspection reporteport
Inspection report for Moray Fostering Service
page 2 of 13
Page 26

Page 27

Children and young people were supported to use formal advocacy to express views and the "Better Meeting
Project" a collaborative art project with care experienced young people in Moray was a good example of
children's views driving change. The service was changing its language in line with 'The Promise'
recommendations from the Independent Care Review and was considering children and young people's
experiences of social work.
Children and young people were achieving positive outcomes in education and had access to a range of
leisure and social activities. Fostering families supported children to have fulfilling lives with high aspirations
for success. This supportive and positive culture contributed to positive outcomes for children and young
people.
Fostering families told us that they felt supported by their current social workers but continuity of
relationships had been impacted by staff turnover and changes in management. This, combined with the
impact of the Covid-19 pandemic, led to carers feeling disconnected from the wider service with a lack of
clarity around who new managers were or the overall vision of the service.
Fostering families worked positively with birth families to support children returning home. We saw
examples of siblings living together in the same fostering family but the service needs to improve how it
supports the needs for sibling relationships for children who do not live in the same fostering household to
build meaningful relationships. This will form an area for improvement (see area for improvement 1).
Children were supported to understand their life story and we saw positive examples of materials produced
with photographs and explanations of events appropriate to a child's age and stage of development. We
also saw examples that lacked photographs of important people or events that were not child friendly. Some
young people's life story information had been lost by the service. This impacts a child's ability to
understand their history and their understanding of their reasons for entering care which negatively impacts
on their sense of identity (see area for improvement 2).
Fostering families had access to training which included supporting in managing challenging behaviour.
Carers and supervising social workers told us that this is an area where carers felt more support was
required to assist them in understanding the behaviour of children in their care to keep everyone safe. The
service does not have a clear training plan and some carers had not engaged with online models of delivery
during the Covid-19 pandemic (see area for improvement 3).
The service should make significant improvements in achieving positive outcomes for children in need of
permanent care. We saw examples of drift and delay both in children achieving legal permanence and the
identification of appropriate fostering families to meet children's needs. This has meant that children have
not experienced the stability and security of a fostering family identified as being able to provide their long
term care. This impacted on children's felt permanence and negatively affected longer term planning and
will form a requirement (see requirement 1).
Safeguarding practice in the service meant that children in the service were not safe and protected from
harm. The decisions made by the service in relation to safeguarding issues were not always consistent, and
we noted instances where carers had not notified the service appropriately when incidents occurred. The
service should ensure all carers have child protection training so are aware of responsibilities in relation to
keeping children safe (see area for improvement 4).
Carers told us that they were not clear about how decisions were made by the service when assessing which
carer was best able to meet a child's needs. Carers did not always get full information about the child's
needs before they came to live with them. A lack of robust decision making in this area led to unsafe
Inspection rInspection reporteport
Inspection report for Moray Fostering Service
page 3 of 13
Page 27

Page 28

situations for children and contributed to negative outcomes. The service should ensure that there are
robust considerations of a carer's ability to meet the needs of a child in advance of a Fostering arrangement
being agreed (see requirement 2).
Requirements
1. By 30 June 2022 the provider must ensure that clear systems are in place to monitor outcomes for
children in need of permanent substitute care.
To do this the provider must as a minimum:
a)ensure robust tracking arrangements are in place for children at all stages of their care journey and that
drift and delay is addressed at each stage of the process.
b)ensure a robust approach is taken to family finding when children are identified as needing permanent
care to ensure that their care needs can met by the right Fostering family.
This is to comply with Regulation 4(1)(a) of The Social Care and Social Work Improvement Scotland
(Requirements for Care Services) Regulations 2011(SSI 2011/210).
This is to ensure that care and support is consistent with the Health and Social Care Standards (HSCS) which
state that:
‘As a child or young person needing permanent alternative care, I experience this without unnecessary delay’
(HSCS 1.16)
2. By 30 June 2022 the provider must ensure that there is a clear identification of a fostering families ability
to meet the needs of a child before the child joins this family.
To do this the provider must as a minimum:
a) have clear a clear referral process which outlines the needs of children needing alternative care from
fostering families
b) Identify carer strengths and vulnerabilities in relation to meeting the needs of a specific child and
outlining any additional support required to ensure that children’s needs are fully met
c) ensure planning meetings take place when children join fostering families to review children’s needs
d) ensure panel members have full information for matching panels including minutes of linking meetings.
This is to comply with Regulation 4(1)(a) of The Social Care and Social Work Improvement Scotland
(Requirements for Care Services) Regulations 2011(SSI 2011/210).
This is to ensure that care and support is consistent with the Health and Social Care Standards (HSCS) which
state that:
‘My care and support meets my needs and is right for me.’ (HSCS 1.19)
Areas for improvement
1. To promote long term positive relationships between brothers and sisters, the provider should have a plan
to facilitate family time between sibling groups who live in different fostering families.
This should include but not be limited to a review of the needs for family time for sibling groups in different
fostering families with a plan to facilitate appropriate ongoing relationships between brothers and sisters.
Inspection rInspection reporteport
Inspection report for Moray Fostering Service
page 4 of 13
Page 28

Page 29

This is to ensure that care and support is consistent with the Health and Social Care Standards (HSCS) which
state that:
‘I am supported to manage my relationships with my family, friends or partner in a way that suits my
wellbeing.' (HSCS 2.18)
2. To ensure all children have a clear understanding of their past the provider should improve its approach to
life story work.
This should include but is not limited to, implementing a consistent approach to gathering and storing
important life story information and providing specific training to staff and carers about how life story work
should be approached.
This is to ensure that care and support is consistent with the Health and Social Care Standards (HSCS) which
state that:
‘I am supported to be emotionally resilient, have a strong sense of my own identity and wellbeing, and
address any experiences of trauma or neglect.’ (HSCS, 1.29)
3. To support Fostering families to fully support children in their care, the provider should improve the
support available to carers in particular in relation to managing challenging behaviour.
This should include but is not limited to the creation of a clear programme of training to create a shared
vision of the approach to care to ensure fostering families are fully supported to meet the needs of children.
This is to ensure that care and support is consistent with the Health and Social Care Standards (HSCS) which
state that:
‘I experience high quality care and support based on relevant evidence, guidance and best practice.’ (HSCS
4.11)
4. To keep all children safe from harm, the provider should ensure that all foster carers are aware of their
responsibilities in relation to child protection.
This should include but is not limited to the provision of specific training in child protection for foster carers.
This is to ensure that care and support is consistent with the Health and Social Care Standards (HSCS) which
state that:
‘I am protected from harm, neglect, abuse, bullying and exploitation by people who have a clear
understanding of their responsibilities.’ (HSCS 3.20).
How good is our leadership? 3 - Adequate
We have evaluated this key question as adequate where strengths just outweigh weaknesses but key areas
of performance need to improve.
The service had some effective quality assurance systems in place to ensure children's wellbeing is
maintained. Performance relating to statutory checks for carers was now effectively monitored to ensure
that ongoing statutory requirements were met to ensure the safety of children. The service has new
management and governance arrangements in place and has taken steps to monitor performance but this is
at an early stage. The service should improve quality assurance systems for monitoring key areas which are
outlined in fostering regulations to ensure that children remain safe within their fostering families this will
Inspection rInspection reporteport
Inspection report for Moray Fostering Service
page 5 of 13
Page 29

Page 30

form a requirement (see requirement 1).
The Fostering and Adoption Panel and Agency Decision Maker provided robust scrutiny to carer review and
applications for approval for fostering families and were able to challenge assessments presented to them. A
panel advisor role further supported quality assurance but the service needs to improve how social work
staff are supported and how practice issues are identified at an earlier stage. We saw examples of delays in
decision making caused by information not being available for panel to consider or information being
presented which was incomplete. This impacted negatively on outcomes for children and young people by
further delaying key decisions about their care (see area for improvement 1).
We did not see evidence of how the service learned from situations where children moved from fostering
families on an unplanned basis. Meetings to discuss these were not held in every case and minutes did not
demonstrate reflection and learning from these situations. The service should ensure that outcomes for
children are constantly reviewed with clear learning and action points identified when unplanned moves
occur to improve future outcomes (see area for improvement 2).
A service development plan is in place which outlines a number of areas of improvement for the service.
Some of these elements were contained in previous plans so the service needs to evidence how it can move
from planning to delivery based on feedback from children, carers and other key stakeholders.
Requirements
1. By 30 June 2022 the provider must ensure that robust quality assurance processes are in place to monitor
key areas of performance within fostering regulations with monitoring and review to identify areas of
continuous improvement:
To do this, the provider must as a minimum ensure:
a) unannounced visits take place within required timescales
b) individual safer caring plans are reviewed regularly in response to changing need
c) full carer checks are monitored and kept up to date.
This is to comply with Regulation 4(1)(a) of The Social Care and Social Work Improvement Scotland
(Requirements for Care Services) Regulations 2011(SSI 2011/210).
This is to ensure that care and support is consistent with the Health and Social Care Standards (HSCS) which
state that:
‘I experience high quality care and support based on relevant evidence, guidance and best practice.’ (HSCS
4.11)
Areas for improvement
1. To promote positive outcomes, the provider should ensure that all staff understand their roles and
responsibilities in relation to quality assurance. This should include but is not limited to improving internal
quality assurance processes and ensuring staff are sufficiently supported to practice effectively.
This is to ensure that care and support is consistent with the Health and Social Care Standards (HSCS) which
state that:
‘I benefit from a culture of continuous improvement, with the organisation having robust and transparent
quality assurance processes.’ (HSCS 4.19)
Inspection rInspection reporteport
Inspection report for Moray Fostering Service
page 6 of 13
Page 30

Page 31

2. To promote positive outcomes for all children, the provider should develop a reflective learning culture
when unplanned endings have occurred. This should include but is not limited to a clear procedure for how
unplanned endings will be reviewed with meetings that identify clear learning and action points for service
improvement.
This is to ensure that care and support is consistent with the Health and Social Care Standards (HSCS) which
state that:
‘I receive an apology if things go wrong with my care and support or my human rights are not respected,
and the organisation takes responsibility for its actions.’ (HSCS 4.4).
How good is our staff team? 3 - Adequate
We have evaluated this key question as adequate where strengths just outweigh weaknesses but key areas
of performance need to improve.
Staff practice observed through tracked cases reflected values and principles of the Health and Social Care
Standards. Fostering families told us that staff had worked hard to build genuine trusting relationships but
this had been impacted by high levels of staff turnover in the service. There were improved working
relationships with the children's social work team with improved communication and joint working. A shared
approach to child's wellbeing across both teams ensured greater consistency of support for children.
Staff had been supported through development sessions run by the service to improve their knowledge and
members of the team were also due to undertake external training provided by The Fostering Network.
Although these are positive improvements, staff expressed that changes in management meant that they
had not had continuity of support and some areas of practice were unclear. Staff had regular supervision but
not consistency in their line manager which impacts on the quality of the supportive relationship. Staff also
had not had access to a clear induction or annual appraisals.
Turnover in management and staffing has impacted on consistency of support provided to Fostering families
and children in the service. One carer told us "Despite all the changes to staffing I do feel I can contact
someone if required, professional and respect the efforts made by all, my present social worker is excellent
and is there for us all the time but how long will they stay!" The service had not undertaken exit interviews
to understand reasons for high staff turnover. Improvements to the levels of staff support provided by the
service will form a requirement to outline specific areas of improvement (see requirement 1).
1. By 30 June 2022 the provider must ensure that all staff are fully trained and supported effectively to
provide consistent support to Fostering families.
To do this the provider must as a minimum ensure:
a) there is a clear induction process for new staff joining the service
b) there is a clear training plan for all staff
c) all staff have regular access to annual appraisal
d) there is continuity of supervisory relationships for all staff
e) exit interviews are undertaken and information analysed to understand reasons for staff turnover so that
this can be addressed.
This is to comply with Regulation 4(1)(a) of The Social Care and Social Work Improvement Scotland
(Requirements for Care Services) Regulations 2011(SSI 2011/210).
Inspection rInspection reporteport
Inspection report for Moray Fostering Service
page 7 of 13
Page 31

Page 32

This is to ensure that care and support is consistent with the SSSC's Code of Practice for Employers of Social
Service Workers, which state that the employer will: 'provide effective, regular supervision to social service
workers to support them to develop and improve through reflective practice' (3.5).
This is to ensure that care and support is consistent with the Health and Social Care Standards (HSCS) which
state that:
I have confidence in people because they are trained, competent and skilled, are able to reflect on their
practice and follow their professional and organisational codes. (HSCS 3.14)
How well is our care and support planned? 3 - Adequate
We have evaluated this key question as adequate where strengths just outweigh weaknesses, but key areas
of performance need to improve.
Children were included in their care planning and were able to influence the direction of their care with
support from formal advocacy where this was required. Children's reviews were held regularly with children
and parents often included in decision making. Language in documentation was in line with 'The Promise'
with children's needs and wishes reflected. To strengthen the voice of children and foster carers and to
increase the focus on outcomes and achievements, children's reviews should look to include written updates
from children, fostering families and the views of the fostering team (see area for improvement 1).
Fostering families were supported to promote safe care with a joint approach to identifying risk undertaken
between the fostering team and children's social workers with regular reviews. We saw examples of family
policies, some of which were individual to children with a risk assessment completed by the child's social
worker. These were not consistently completed and we did not see evidence of how carers and children were
involved in discussions. The service should improve the implementation of their approach to ensure that
children and carers are included in discussions to promote a shared understanding of potential risks, this
will form an area for improvement (see area for improvement 2).
Areas for improvement
1. To promote children’s welfare, the provider should ensure that children’s reviews reflect the views of the
young person and their fostering family. This should include but is not limited to, children, fostering families
and fostering team staff providing written updates for children’s reviews and improving how it gathers these
views prior to meetings taking place.
This is to ensure that care and support is consistent with the Health and Social Care Standards (HSCS) which
state that:
‘I experience high quality care and support because people have the necessary information and resources.’
(HSCS 4.27)
2. To ensure children and fostering families are included in discussions related to safer caring, the service
should review its implementation of safer caring plans. This should include but not be limited to, reviewing
formats of documentation and improving guidance to staff on how to engage children and Fostering
families in safer caring plans.
This is to ensure that care and support is consistent with the Health and Social Care Standards (HSCS) which
state that:
Inspection rInspection reporteport
Inspection report for Moray Fostering Service
page 8 of 13
Page 32

Page 33

‘I am as involved as I can be in agreeing and reviewing any restrictions to my independence, control and
choice.’ (HSCS 2.6)
Requirements
Requirement 1
Theagency must ensure that quality assurance systems are robust and areused effectively in order to
monitor that formal/statutory checks for foster carers are always up to date and reviewed appropriately.
This is in order to comply with The Social Care and Social Work Improvement Scotland (Requirements for
Care Services) Regulations 2011 - Regulation 4 (1) (a) - 'A provider must make proper provision for the
health, welfare and safety of service users.'
This is to ensure that care and support is consistent with the Health and Social Care Standards which state:
"I benefit from a culture of continuous improvement, with the organisation having robust and transparent
quality assurance processes". (HSCS 4.19) Timescale: March 2020
This requirement was made on 23 October 2019.
Action taken on previous requirement
New system in place to monitor checks.
Met - within timescales
Areas for improvement
Previous area for improvement 1
To ensure a child centered approach is followed in all cases, theagency mustprovidecomprehensive
planning for every child and young person moving on a temporary basisto respite carer. Thisshould involve
all key individuals attending a planning meeting, andallow time for introductions to be made. In addition,
the agency should, in participation with carers and young people explore alternative options to formal
respite care.
This is to ensure that care and support is consistent with the Health and Social Care Standards which state
What the service has done to meet any requirements we made at
or since the last inspection
What the service has done to meet any areas for improvement we
made at or since the last inspection
Inspection rInspection reporteport
Inspection report for Moray Fostering Service
page 9 of 13
Page 33

Page 34

"I experience high quality care and support because people have the necessary information and resources".
(HSCS 4.27)and"I am supported and cared for by people I know so that I can experience consistency and
continuity". (HSCS 4.16)
This area for improvement was made on 23 October 2019.
Action taken since then
Met. Nominated carers scheme implemented to improve consistency of short break care.
Previous area for improvement 2
The agency should address problematic staff relationships between and within teams to ensure good quality
support for children and their families is always available.
This is to ensure that the quality of care and support and management and leadership is consistent with the
Health and Social Care Standards (HSCS) which state: "I am confident that the right people are fully
informed about my past, including my health and care experience, and any impact this has on me" (HSCS
3.4), and "My care and support is consistent and stable because people work well together". (HSCS 3.19)
This area for improvement was made on 23 October 2019.
Action taken since then
Met. Improved joint working between children's social work teams and fostering team. Cultural change in
fostering team with child at the centre of planning and shared responsibility for positive outcomes.
Previous area for improvement 3
The agency shouldensure thatthe quality of reports being provided to the fostering panel is appropriately
scrutinised. This will improve matching considerations and clearly highlight areas of vulnerability. The
creation of a panel advisor role would support decision-making within the panel.
This is to ensure that the quality of care and support and management and leadership is consistent with the
Health and Social Care Standards (HSCS) which state: "I benefit from a culture of continuous improvement,
with the organisation having robust and transparent quality assurance processes". (HSCS 4.19)
This area for improvement was made on 23 October 2019.
Action taken since then
Met. Panel advisor role created within the service.
Previous area for improvement 4
The service should devise a development plan that follows SMART principles (Specific, measurable,
achievable, relevant and timely) and be regularly reviewed.
This is to ensure that the quality of care and support and management and leadership is consistent with"I
use an organisation that is well led and managed" HSCS (4.23). The service should devise a development
plan that follows SMART principles (Specific, measurable, achievable, relevant and timely) and be regularly
reviewed.
This is to ensure that "I use an organisation that is well led and managed" HSCS (4.23).
This area for improvement was made on 23 October 2019.
Inspection rInspection reporteport
Inspection report for Moray Fostering Service
page 10 of 13
Page 34

Page 35

Action taken since then
Met. Service development plan is in place.
Complaints
There have been no complaints upheld since the last inspection. Details of any older upheld complaints are
published at www.careinspectorate.com.
Inspection rInspection reporteport
Inspection report for Moray Fostering Service
page 11 of 13
Page 35

Page 36

Detailed evaluations
How well do we support people's wellbeing? 2 - Weak
1.1 Children, young people. adults and their caregiver families experience
compassion, dignity and respect 4 - Good
1.2 Children, young people and adults get the most out of life 3 - Adequate
1.3 Children, young people and adults' health and wellbeing benefits from
the care and support they experience 3 - Adequate
1.4 Children, young people, adults and their caregiver families get the
service that is right for them 2 - Weak
How good is our leadership? 3 - Adequate
2.2 Quality assurance and improvement are led well 3 - Adequate
How good is our staff team? 3 - Adequate
3.2 Staff have the right knowledge, competence and development to
support children, young people, adults and their caregiver families 3 - Adequate
How well is our care and support planned? 3 - Adequate
5.1 Assessment and care planning reflects the outcomes and wishes of
children, young people and adults 3 - Adequate
Inspection rInspection reporteport
Inspection report for Moray Fostering Service
page 12 of 13
Page 36

Page 37

To find out more
This inspection report is published by the Care Inspectorate. You can download this report and others from
our website.
Care services in Scotland cannot operate unless they are registered with the Care Inspectorate. We inspect,
award grades and help services to improve. We also investigate complaints about care services and can take
action when things aren't good enough.
Please get in touch with us if you would like more information or have any concerns about a care service.
You can also read more about our work online at www.careinspectorate.com
Contact us
Care Inspectorate
Compass House
11 Riverside Drive
Dundee
DD1 4NY
enquiries@careinspectorate.com
0345 600 9527
Find us on Facebook
Twitter: @careinspect
Other languages and formats
This report is available in other languages and formats on request.
Tha am foillseachadh seo ri fhaighinn ann an cruthannan is cànain eile ma nithear iarrtas.
Inspection rInspection reporteport
Inspection report for Moray Fostering Service
page 13 of 13
Page 37

Page 38

Page 38

Page 39

MorMoraay Adoption Sy Adoption Serervicevice
Adoption Service
The Moray Council
Rose Cottage
PO Box 67
Elgin
IV30 9BX
Telephone: 01343 563 568
Type of inspection:
Announced (short notice)
Completed on:
18 March 2022
Service provided by: Service provider number:
The Moray Council SP2003001892
Service no:
CS2004082047
Item 7
Page 39

Page 40

About the service
Moray Adoption service provides a service for children and young people aged from birth to 18 years old and
their families. The service recruits and supports adoptive parents to provide families for those children who
cannot be with their birth parents or extended family members, and whose needs have been assessed as
best met in an adoptive family.
It should be noted that this inspection took place during the Covid-19 pandemic restrictions and therefore
followed a revised procedure for conducting inspections in these circumstances. We spoke with the
management team, staff and other professionals and viewed evidence sent to us virtually. We made
arrangements to visit adoptive families and children in their homes.
What people told us
We observed young children in their adoptive families and concluded that they were having positive
experiences and were receiving high levels of support and care. Adoptive families told us that they felt well
supported by current workers in the adoption team but reflected that there had been changes in
management and there was felt to be fragility in the support being provided by a limited number of staff
with no awareness of who the manager of the service is by the adoptive families.
From this inspection we evaluated this service as:
In evaluating quality, we use a six point scale where 1 is unsatisfactory and 6 is excellent
How well do we support people's wellbeing? 2 - Weak
How good is our leadership? 3 - Adequate
How good is our staff team? 3 - Adequate
How well is our care and support planned? 2 - Weak
Further details on the particular areas inspected are provided at the end of this report.
How well do we support people's wellbeing? 2 - Weak
We evaluated this key question as weak overall, as while some strengths could be identified, these were
compromised by significant weaknesses. As these weaknesses concerned the welfare and safety of children
and young people, we have made requirements for improvement. The service's performance in parts of this
key question were good and adequate.
Children and young people experienced supportive and enduring relationships with adoptive families who
provided them with a sense of belonging. We were confident that young people were experiencing love,
were claimed and were having their needs fully met by committed adoptive families.During visits, we saw
Inspection rInspection reporteport
Inspection report for Moray Adoption Service
page 2 of 12
Page 40

Page 41

adoptive parents demonstrating individualised and attuned care. Children benefitted from support from
carers who understand their individual strengths and preferences.
Children and young people were achieving positive outcomes in education and had access to a range of
age-appropriate leisure and social activities. Adoptive families supported children to have fulfilling lives with
high aspirations for success. This supportive and positive culture contributed to positive outcomes for
children and young people.
Adoptive families told us that they felt supported by their current supervising social worker, but continuity of
relationships had been impacted by some staff turnover and changes in management. This, combined with
the covid-19 pandemic, led to carers feeling disconnected from the wider service with a lack of clarity
around who new managers were or the overall vision of the service.
Children and young people were benefitting from adoptive families working positively with birth families.
One birth mother told us about the support she had received to create photo books and life story work for
her children and how much she had valued the opportunity to meet the adopters.
Adoptive families had limited training opportunities post approval. We heard that the service plans to
implement a program of training aimed at adopters post approval and prior to having a child placed with
themand we will review progress on this at the next inspection.
The service should make significant improvements in achieving positive outcomes for children in need of
permanent care. We saw examples of drift in delay both in children achieving legal permanence and the
identification of appropriate caregiver families to meet children's needs. This has meant that some children
have not experienced the stability and security of a family identified as being able to provide secure, long-
term care. This impacted on children's stability in their day-to-day lives and opportunities to move to
permanent or adoptive families (see requirement 1).
We found that permanency planning for children was subject to delays in all cases that we reviewed where
children had been identified as requiring permanent alternative care including adoption. Planning was not
actioned in a timely manner or was impacted by poor information governance. We saw drift in individual
plans and delay in achieving permanence, affecting children's stability in their day-to-day lives and
opportunities to move to a permanent or adoptive family.
Safeguarding practice in the service meant that children in the service were safe and protected from harm.
During our sampling of evidence, we identified some cases where safeguarding concerns had not been
notified to the care inspectorate. The service should ensure all carers have child protection training so are
aware of responsibilities in relation to keeping children safe.
Families told us that they were not clear about how decisions were made by the service when assessing
which carer was best able to meet a child's needs. Carers did not always get full information about the
child's needs before they came to live with them. A lack of robust decision making in this area led to
potentially unsafe situations for children. The service should ensure that there are robust considerations of a
carer's ability to meet the needs of a child in advance of a caregiving arrangement being agreed (see
requirement 2).
We heard that not all adopters were being provided with life story information for their children and no
families we spoke with had later life letters for their children. We saw no evidence that the adoption service
is tracking and progressing these pieces of work.
Inspection rInspection reporteport
Inspection report for Moray Adoption Service
page 3 of 12
Page 41

Page 42

Requirements
1. By 30 June 2022 the provider must ensure that clear systems are in place to monitor outcomes for
children in need of permanent substitute care.
To do this the provider must as a minimum:
a) ensure robust tracking arrangements are in place for children at all stages of their care journey and that
drift and delay is addressed at each stage of the process
b) ensure a robust approach is taken to family finding when children are identified as needing permanent
care to ensure that their care needs can be best met.
This is to comply with Regulation 4(1)(a) of the The Social Care and Social Work Improvement Scotland
(Requirements for Care Services) Regulations 2011(SSI 2011/210).
This is to ensure that care and support is consistent with the Health and Social Care Standards (HSCS) which
state that:
‘As a child or young person needing permanent alternative care, I experience this without unnecessary
delay.’ (HSCS 1.16)
2. By 30 June 2022 the provider must ensure that there is a clear identification of a caregiver family’s ability
to meet the needs of a child before the child joins this family.
To do this the provider must as a minimum:
a) have clear a clear referral process which outlines the needs of children needing alternative care from
caregiver families
b) identify carer strengths and vulnerabilities in relation to meeting the needs of a specific child and
outlining any additional support required to ensure that children’s needs are fully met
c) ensure planning meetings take place when children join caregiver families to review children’s needs
d) ensure panel members have full information for matching panels including minutes of linking meetings.
This is to comply with Regulation 4(1)(a) of The Social Care and Social Work Improvement Scotland
(Requirements for Care Services) Regulations 2011(SSI 2011/210).
This is to ensure that care and support is consistent with the Health and Social Care Standards (HSCS) which
state that:
‘My care and support meets my needs and is right for me.’ (HSCS 1.19)
How good is our leadership? 3 - Adequate
We have evaluated this key question as adequate. While the strengths had a positive impact, key areas need
to improve.
The service has a new management and governance arrangement in place and has taken steps to monitor
performance. Whilst we heard that staff were generally positive about these changes this is at an early
stage. The service had implemented a series of practice workshops to support development of staff and to
strengthen the culture of the team.
The service generally dual approves adopters, also registering them as foster carers. This has a significant
benefit of allowing children to move into their planned permanent placement at a much younger age
Inspection rInspection reporteport
Inspection report for Moray Adoption Service
page 4 of 12
Page 42

Page 43

without having to wait for legal matters to be concluded, which usually meant that attachment with
adopters were easier to make. We were concerned to find that these families are not being supervised as
foster carers and in line with fostering regulations. We saw a lack of supervision, training and review of
these carers, therefore there is no evidence of reviewor quality assurance processes for such families. This
will form a requirement (see requirement 1).
The service should improve quality assurance systems for monitoring key areas which are outlined in
fostering and adoption legislation to ensure children remain safe within their adoptive families.
We observed adoption panels and were confident in the skill mix of panel members and their ability to carry
out their functions confidently. Most panel members had received supervision for their role.
Outcomes for children and young people were potentially poor due to issues identified in the panel
matching process. We reviewed panel processes for the matching of children and young people to their
adoptive families and were concerned to see that not all panel members were provided with full paperwork,
therefore we were not confident in robustness of assessment and decision-making processes. This will form
a requirement (see requirement 2).
The fostering and adoption panel and agency decision maker provide scrutiny to applications to adopt, and
we saw evidence of applications being challenged. The panel advisor role further supported quality
assurance, however the service needs to improve how social work staff are supported and how practice
issues are identified at an earlier stage. We saw examples of delays in decision making caused by
information not being available for panel to consider or information being presented which as incomplete.
This impacted negatively on outcomes for children by further delaying key decisions about their care (see
area for improvement 1).
A service development plan is in place which outlines a number of areas of improvement for the service.
Some of these elements were contained in previous plans so the service needs to evidence how it can move
from planning to delivery based on feedback from children, carer and other key stakeholder. We could see
that the service had made some recent progress with this as we saw evidence of feedback being sought
from adoptive families.
During our inspection we found that managers have a vision for the service and are beginning to make
progress, however, they will require a stable staff team and skilled workers to move this on. Progress on this
will be reviewed at the next inspection.
Requirements
1. By 30 June 2022 the provider must ensure that all dual registered foster carer/adopters are supported in
line with fostering legislation and best practice.
To do this the provider must as a minimum:
a) undertake foster care agreements in line with best practice guidance and statutory requirements
b) ensure systems are in place for identification and panel review of dual registered prospective adopters
c) ensure that all carers are supported through regular supervision and have access to relevant training
d) ensure that the safety of children and young people is improved through unannounced visits
e) Individual safer caring plans are developed and reviewed regularly in response to changing need
f) full carers checks are monitored and kept up to date.
Inspection rInspection reporteport
Inspection report for Moray Adoption Service
page 5 of 12
Page 43

Page 44

This is to comply with Regulation 4(1)(a) of The Social Care and Social Work Improvement Scotland
(Requirements for Care Services) Regulations 2011(SSI 2011/210).
This is to ensure that care and support is consistent with the Health and Social Care Standards (HSCS) which
state that:
"I receive high quality care and support based on relevant evidence, guidance and best practice." (HSCS 4.11)
2. By 30 June 2022 the provider must ensure that all children and young people are cared for in safe and
well-matched adoptive families.
To do this, the provider must as a minimum:
a) ensure that Panel members are all provided with relevant documentation to inform the matching of
young people with their adoptive families.
This is to comply with Regulation 4(1)(a) of The Social Care and Social Work Improvement Scotland
(Requirements for Care Services) Regulations 2011(SSI 2011/210).
This is to ensure that care and support is consistent with the Health and Social Care Standards (HSCS) which
state that:
‘My care and support meets my needs and is right for me.’ (HSCS 1.19)
Areas for improvement
1. To promote positive outcomes, the provider should ensure that all staff understand their roles and
responsibilities in relation to quality assurance.
This should include but is not limited to improving internal quality assurance processes and ensuring staff
are sufficiently supported to practice effectively.
This is to ensure that care and support is consistent with the Health and Social Care Standards (HSCS) which
state that:
‘I benefit from a culture of continuous improvement, with the organisation having robust and transparent
quality assurance processes.’ (HSCS 4.19)
How good is our staff team? 3 - Adequate
We evaluated this key question as adequate. While the strengths had a positive impact, key areas of
performance need to improve.
Staff practice observed through tracked cases reflected values and principles of the Health and Social Care
Standards. Adoptive families told us that staff had worked hard to build genuine trusting relationships, but
this had been impacted by high levels of staff turnover in the service. There were improved working
relationships with the children's social work team with improved communication and joint working. A
shared approach to child's wellbeing across both teams ensured greater consistency of support for
children.
Staff had been supported through development sessions run by the service to improve their knowledge and
members of the team were also due to undertake external training provided by The Fostering Network.
Inspection rInspection reporteport
Inspection report for Moray Adoption Service
page 6 of 12
Page 44

Page 45

Although these are positive improvements, staff expressed thatchanges in management meant that they
had not had continuity of support and some areas of practice were unclear. Staff had regular supervision
but not consistency in their line manager which impacts on the quality of the supportive relationship. New
staff told us that they had also had not had access to a clear induction or annual appraisals or development
plans.
Turnover in management and staffing has impacted on consistency of support provided to adoptive families
and children in the service. One carer told us "My supervising social worker is great, but I don't know who
the manager is, and I wouldn't know who to contact if my social worker left".
The service had not undertaken exit interviews to understand reasons for high staff turnover.
Improvements to the levels of staff support provided by the service will form a requirement to outline
specific areas of improvement (see requirement 1).
1. By 30 June 2022 the provider must ensure that all staff are fully trained and supported effectively to
provide consistent support to caregiver families.
To do this the provider must as a minimum ensure:
a) there is a clear induction process for new staff joining the service
b) there is a clear training plan for all staff
c) all staff have regular access to annual appraisal
d) there is continuity of supervisory relationships for all staff
e) exit interviews are undertaken and information analysed to understand reasons for staff turnover so that
this can be addressed.
This is to comply with Regulation 4(1)(a) of The Social Care and Social Work Improvement Scotland
(Requirements for Care Services) Regulations 2011(SSI 2011/210).
This is to ensure that care and support is consistent with the Health and Social Care Standards (HSCS) which
state that:
‘I have confidence in people because they are trained, competent and skilled, are able to reflect on their
practice and follow their professional and organisational codes’. (HSCS 3.14)
How well is our care and support planned? 2 - Weak
We evaluated this key question as weak. Whilst some strengths could be identified, these were
compromised by significant weaknesses. As these weaknesses concerned the welfare and safety of children
and young people, we have made a requirement.
We had concerns that when reviewing documentation, we found that there was limited evidence of families
having individual support plans which outlined the need for post adoption support.
We found that staff are proactive in offering support and maintaining relationships until the adoption is
formalised, however, post adoption there is a lack of clarity about services available and no apparent
assessment of individual needs for families. From the sample we reviewed we saw that the child's plan does
evidence some post adoption support needs, however, these are not specific or individualised.
The service should adhere to adoption legislation and best practice guidance in which adoptive families
Inspection rInspection reporteport
Inspection report for Moray Adoption Service
page 7 of 12
Page 45

Page 46

meet with the service to identify supports when an adoption is legally granted. We would then expect that
families meet with the service at set timescales to review needs. This will ensure that children and adoptive
families receive appropriate support when they need it.
We saw limited evidence of co-ordination meetings and no evidence of any linking meetings which led us to
conclude that there was a lack of information on which to make an analysis of any post adoption support
needed.
The service had in recent months made use of Self-Directed Support (SDS) funding to assess adoption
support needs and provide services required. This was at the early stages and potentially a good
progression, however, there was some concern that this may be used at crisis stagerather than in a pro-
active manner.
The service had limited success in setting up and maintaining adoption support groups. They were aware of
this and are continuing to address this using gap using a range of methods, for example the development of
a closed Facebook page.
We saw no management overview relating to areas such as the management of birth family time, letterbox
contact and provision of later life letters. There were no clear mechanisms for the service to track and
monitor this practice which increases the risk that important information is lost which will impact on
children's life experience.
The lack of adoption support plans led us to conclude that children and their families were not receiving
responsive, tailored and timely interventions.The service has not met the recommendation met at the last
inspection regarding developing a strategic approach to providing post adoption support and therefore due
to our continued concerns this will now form a requirement (see requirement 1).
Requirements
1. By 30 June 2022 the provider must adopt a strategic approach to providing post adoption support
services.
To do this, the provider must as a minimum ensure:
a) all adoptive families have an adoption support plan in place and that this is reviewed in line with
legislation and good practice guidance
b) ensure that staff are fully aware of their roles and adopters are aware of their rights in relation to the
development of adoption support plans.
This is to comply with Regulation 4(1)(a) of The Social Care and Social Work Improvement Scotland
(Requirements for Care Services) Regulations 2011(SSI 2011/210).
This is to ensure that the quality of care and support is consistent with the Health and Social Care Standards
(HSCS) which state:
‘I am supported and cared for sensitively by people who anticipate issues and are aware of and plan for any
known vulnerability or frailty’. (HSCS 3.18)
Inspection rInspection reporteport
Inspection report for Moray Adoption Service
page 8 of 12
Page 46

Page 47

Areas for improvement
Previous area for improvement 1
The service should adopt a strategic approach to providing post adoption support services.
This is to ensure that the quality of care and support is consistent with the Health and Social Care Standards
(HSCS) which state "I am supported and cared for sensitively by people who anticipate issues and are aware
of and plan for any known vulnerability or frailty" (HSCS 3.18).
This area for improvement was made on 23 October 2019.
Action taken since then
The service have been unable to evidence any progress on this.
Previous area for improvement 2
The service should adopt a more strategic approach to participation.
This is to ensure that the quality of care and support is consistent with the Health and Social Care Standards
(HSCS) which state "I can be meaningfully involved in how the organisations that support and care for me
work and develop" (HSCS 4.6), and "I know how, and can be helped, to make a complaint or raise a concern
about my care and support" (HSCS 4.20).
This area for improvement was made on 23 October 2019.
Action taken since then
The service have evidence some progress in relation to participation, however, need to develop this further.
Previous area for improvement 3
The agency should address staff relationships between and within teams to ensure good quality support for
children and their families.
This is to ensure that the quality of care and support and management and leadership is consistent with the
Health and Social Care Standards (HSCS) which state "I am confident that the right people are fully informed
about my past, including my health and care experience, and any impact this has on me" (HSCS 3.4), and
"My care and support is consistent and stable because people work well together" (HSCS 3.19).
This area for improvement was made on 23 October 2019.
Action taken since then
There has been some improvement in relationships between and within teams. This will require monitoring
in order to maintain this.
What the service has done to meet any areas for improvement we
made at or since the last inspection
Inspection rInspection reporteport
Inspection report for Moray Adoption Service
page 9 of 12
Page 47

Page 48

Previous area for improvement 4
The agency should develop a service improvement plan based on user and staff feedback and performance
reporting.
This is to ensure that the quality of management and leadership is consistent with the Health and social
Care Standards (HSCS) which states "I benefit from a culture of continuous improvement, with the
organisation having robust and transparent quality assurance processes" (HSCS 4.19).
This area for improvement was made on 23 October 2019.
Action taken since then
The service have an improvement plan in place, however, they should strengthen this through the inclusion
of user and staff feedback and performance reporting.
Complaints
There have been no complaints upheld since the last inspection. Details of any older upheld complaints are
published at www.careinspectorate.com.
Inspection rInspection reporteport
Inspection report for Moray Adoption Service
page 10 of 12
Page 48

Page 49

Detailed evaluations
How well do we support people's wellbeing? 2 - Weak
1.1 Children, young people. adults and their caregiver families experience
compassion, dignity and respect 4 - Good
1.2 Children, young people and adults get the most out of life 4 - Good
1.3 Children, young people and adults' health and wellbeing benefits from
the care and support they experience 3 - Adequate
1.4 Children, young people, adults and their caregiver families get the
service that is right for them 2 - Weak
How good is our leadership? 3 - Adequate
2.2 Quality assurance and improvement are led well 3 - Adequate
How good is our staff team? 3 - Adequate
3.2 Staff have the right knowledge, competence and development to
support children, young people, adults and their caregiver families 3 - Adequate
How well is our care and support planned? 2 - Weak
5.1 Assessment and care planning reflects the outcomes and wishes of
children, young people and adults 2 - Weak
Inspection rInspection reporteport
Inspection report for Moray Adoption Service
page 11 of 12
Page 49

Page 50

To find out more
This inspection report is published by the Care Inspectorate. You can download this report and others from
our website.
Care services in Scotland cannot operate unless they are registered with the Care Inspectorate. We inspect,
award grades and help services to improve. We also investigate complaints about care services and can take
action when things aren't good enough.
Please get in touch with us if you would like more information or have any concerns about a care service.
You can also read more about our work online at www.careinspectorate.com
Contact us
Care Inspectorate
Compass House
11 Riverside Drive
Dundee
DD1 4NY
enquiries@careinspectorate.com
0345 600 9527
Find us on Facebook
Twitter: @careinspect
Other languages and formats
This report is available in other languages and formats on request.
Tha am foillseachadh seo ri fhaighinn ann an cruthannan is cànain eile ma nithear iarrtas.
Inspection rInspection reporteport
Inspection report for Moray Adoption Service
page 12 of 12
Page 50

Page 51

Inspection Grades March 2022
Fostering, Adoption and Adult Placement Services
Team Grades Overall Grades
QI Fostering Adoption Cont Care QI Fostering/Continuing Care Adoption
1.1 4 4 5 1.1 4 4
1.2 3 4 4 1.2 3 4
1.3 3 3 5 1.3 3 3
1.4 2 2 4 1.4 2 2
2.2 3 3 4 2.2 3 3
3.2 3 3 3 3.2 3 3
5.1 3 2 4 5.1 3 2
Quality Indicators
1.1 Children, young people, adults and their caregiver families experience compassion dignity and respect
1.2 Children, young people and adults get the most out of life
1.3 Children, young people and adults’ health and wellbeing benefits from the care and support they experience
1.4 Children, young people, adults and their caregiver families get the service that is right for them
2.2 Quality assurance and improvement are led well
3.2 Staff have the right knowledge, competence and development to support children, young people, adults and their caregiver families
5.1 Assessment and care planning reflects the outcomes and wishes of children, young people and adults
Six-Point Scale
6 Excellent Outstanding or sector leading
5 Very Good Major strengths
4 Good Important strengths, with some areas for improvement
3 Adequate Strengths just outweigh weaknesses
2 Weak Important weaknesses - priority action required
1 Unsatisfactory Major weaknesses - urgent remedial action required
Item 7
Page 51

Page 52

Placement Services
Improvement Action CI Review#1 date Review RAG Review#2 Date
Staff understand Quality Assurance (fostering) IMP
B2
(F3)
02/02/2023 31/07/2023
Re-establish Unplanned Endings Meeting for fostering,
adoption and TCAC
IMP
B3
02/02/2023 31/07/2023
Clear induction process for new staff (fostering) REQ
C1a
(G1a)
27/01/2023 31/07/2023
Training plan for all staff (fostering) REQ
C1b
(G1b)
27/01/2023 31/07/2023
All staff have annual appraisals (fostering) REQ
C1c
(G1c)
27/01/2023 31/07/2023
Continuity of supervisors with staff (fostering) REQ
C1d
(G1d)
27/01/2023 31/07/2023
Exit interviews undertaken and info analysed (fostering) REQ
C1e
(G1e)
27/01/2023 31/07/2023
Staff understand Quality Assurance (adoption) IMP
F3
(B2)
02/02/2023 31/07/2023
Clear induction process for new staff (adoption) REQ
G1a
(C1a)
27/01/2023 31/07/2023
Training plan for all staff (adoption) REQ
G1b
(C1b)
27/01/2023 31/07/2023
All staff have annual appraisals (adoption) REQ
G1c
(C1c)
27/01/2023 31/07/2023
Continuity of supervisors with staff (adoption) G1d
(C1d)
REQ
27/01/2023 31/07/2023
Exit interviews undertaken and info analysed (adoption) REQ
G1e
(C1e)
27/01/2023 31/07/2023
Page 52

Page 53

Fostering
Improvement Action CI Review#1 date Review RAG Review#2 date
Robust permanence tracking arrangements at all
stages
REQ
A1a
(E1a)
27/01/2023 31/07/2023
Robust approach to family finding for permanence REQ
A1b
27/01/2023 31/07/2023
Clear referral process to fostering REQ
A2a
27/01/2023 31/07/2023
Robust family finding and matching process REQ
A2b
27/01/2023 31/07/2023
Planning meetings for new placements REQ
A2c
27/01/2023 31/07/2023
Robust plan for contact between siblings in different
foster placements
IMP
A3
02/02/2023 31/07/2023
Robust Life Story Work practice IMP
A4
02/02/2023 31/07/2023
Support carers with challenging behaviour IMP
A5
02/02/2023 31/07/2023
Support carers with child protection IMP
A6
02/02/2023 31/07/2023
Unannounced visits within timescales REQ
B1a
(F1d)
27/01/2023 31/07/2023
Safer caring plans are reviewed regularly REQ
B1b
(D2)
(F1e)
27/01/2023 31/07/2023
Full carer checks are monitored REQ
B1c
(F1f)
27/01/2023 31/07/2023
Views of young people and foster carers presented
at LAC reviews
IMP
D1
02/02/2023 31/07/2023
Review of safer caring plans - documentation and
guidance
IMP
D2
(B1b)
(F1e)
02/02/2023 31/07/2023
Page 53

Page 54

Adoption
Improvement action CI Review#1 Date Review RAG Review#2 date
Tracking for all children through their journey REQ
E1a
(A1a)
27/01/2023 31/07/2023
Robust family finding for permanence REQ
E1b
27/01/2023 31/07/2023
Clear referral process outlining needs of children REQ
E2a
27/01/2023 31/07/2023
Identify carers strengths and vulnerabilities for a
specific child and additional support required 
REQ
E2b
27/01/2023 31/07/2023
Ensure planning meetings take place after a child is
placed
REQ
E2c
27/01/2023 31/07/2023
Undertake foster care agreements for dual
registered foster carers/adopters
REQ
F1a
27/01/2023 31/07/2023
Ensure concurrency carers are reviewed at Panel REQ
F1b
27/01/2023 31/07/2023
Concurrency carers to have regular supervision and
access to training
REQ
F1c
27/01/2023 31/07/2023
Ensure unannounced visits take place for
concurrency carers
REQ
F1d
(B1a)
27/01/2023 31/07/2023
Safer caring plans are developed and reviewed
regularly for concurrency carers
REQ
F1e
(B1b)
(D2)
27/01/2023 31/07/2023
Concurrency carers are subject to full carers checks
which are monitored and kept up to date
REQ
F1f
(B1c)
27/01/2023 31/07/2023
All adoptive families to have an adoption support
plan; to be reviewed
REQ
H1a
27/01/2023 31/07/2023
Staff and adopters to be aware of the need for
adoption support plans
REQ
H1b
27/01/2023 31/07/2023
Page 54

Page 55

F&A Panel
Improvement Action CI Review date#1 Review RAG Review#2 date
Panel members have full information for matching panels
(fostering)
REQ
A2d
27/01/2023 31/07/2023
Panel members have full information for matching panels
(adoption)
REQ
E2d
27/01/2023 31/07/2023
Panel members have full information for matching panels
(concurrency)
REQ
F2a
27/01/2023 31/07/2023
Page 55

Page 56

Page 56

Page 57

REPORT TO:   EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 19 APRIL 2023 
SUBJECT: CHILDREN AND FAMILIES SOCIAL WORK SERVICES
REVENUE BUDGET MONITORING TO 31 DECEMBER 2022 
BY:  CHIEF OFFICER HEALTH AND SOCIAL CARE MORAY 
1. REASON FOR REPORT 
1.1 To inform the Committee of the budget position for Children and Families
Social Work Services as at 31 December 2022. 
1.2 This report is submitted to Council in terms of Section III (A) (2) of the
Council’s Scheme of Administration relating to the consideration of capital and
revenue budgets and long term financial plans. 
2.  RECOMMENDATION 
2.1 It is recommended that Committee scrutinises and notes the budget
position at 31 December 2022 
3. BACKGROUND 
3.1 The report highlights those areas of the budget where there is a significant
percentage variance identified at 31 December 2022. 
4. BUDGET POSITION 
4.1 The spend at 31 December 2022 is £11,932,000 against a budget to date of
£12,201,000, giving an underspend of £269,000 as shown in Appendix 1. 
4.2 There are underspends on adoption allowances and legal fees £46,000,
fostering fees and allowances £113,000 and delays in new contracts starting
£121,000.  There is also one-off income for adoption placements in Moray of
£33,000. The underspends are reduced by an overspend in self directed
support. 
Item 8
Page 57

Page 58

5 ESTIMATED OUTTURN 
5.1 The estimated outturn for 2022/23 is £17,417,000 against a budget of
£18,150,000 resulting in an estimated underspend for the year of £733,000. 
5.2 The main underspends are adoption allowances and legal fees £82,000,
fostering fees and allowances £96,000, throughcare/aftercare grants £31,000
and delays in procuring new contracts £214,000. There is also one-off income
for an adoption placement in Moray of £33,000. The underspends are reduced
by overspends on self directed payments £82,000 and home to school
transport £62,000. 
5.3 Staff savings from vacancies and appointment below top of scale are
anticipated to exceed the budget by £407,000 
6. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement 
Plan (LOIP)
The Children’s Services Revenue Budget has particular reference to
National Outcome 8 – we have improved the life chances for children,
young people and families at risk. 
(b)  Policy and Legal
The Council has statutory responsibilities to meet educational
needs, the needs of children and young people in need and those it
looks after. 
(c)  Financial implications
The resource implications are set out in this report and at Appendix 1.
The underspend as at 31 December 2022 is £269,000 against a
budget to date of 12,201,000. The estimated year end position is
expenditure of £17,417,000 against a budget of £18,150,000 resulting
in an underspend of £733,000. 
(d)  Risk implications
Budget Managers are aware of their responsibilities for managing
budget allocations and approval for any variances will be sought from
Committee in line with the Financial Regulations. 
(e)  Staffing implications
There are no staffing implications associated with this report. 
(f)  Property
There are no property implications associated with this report. 
(g)  Equalities/Socio Economic Impact
An Equality Impact Assessment is not needed because the report is to
inform the Committee on budget monitoring. 
Page 58

Page 59

(h)  Climate Change and Biodiversity Impacts
No climate change and biodiversity impacts arise directly from this report. 
(i) Consultations
Lorraine Paisey, Chief Financial Officer and Tracey Sutherland,
Committee Services Officer, have been consulted and are in
agreement with the contents of this report where it relates to their areas
of responsibility. 
7. CONCLUSION 
7.1 That Committee scrutinises and notes the budget position as at 31
December 2022. 
Author of Report: Tracy Stephen, Head of Service (MIJB) 
Nicky Gosling, Accountant
Background Papers: With authors 
Ref:  SPMAN-305227695-70 / SPMAN-305227695-71 
Page 59

Page 60

Page 60

Page 61

Children and Families Social Work Services Appendix 1
Budget Monitoring Report to 31st December 2022
Service
Revised
Budget 
Budget to
Date 
Actual to
Date 
Variance to
Date  Variance
Full Year
Forecast
Full Year
Variance
£'000  £'000  £'000  £'000 % £'000  £'000
Children Services and Criminal Justice Management 55              55              63                  (8) (15)% 55 -
Quality Assurance Team 215 157 143 14 9 % 212 3
Locality Planning Pilot 87 87 87 - - 87 -
Children's Services Area Teams 4,524 3,289 3,393 (104) (3)% 4,652 (128)
Corporate Parenting & Commissioning 12,057 9,246 8,877 369 4 % 11,608 449
Justice Services 453 271 266 5 2 % 451 2
Reviewing Team 337 250 249 1 - 337 -
Children Services Additional Funding 201 (1,154) (1,146) (8) - 201 -
Efficiency Savings-Children's Services 221 - - - - (186) 407
-
Children's Services Total 18,150 12,201 11,932 269 - 17,417 733
Item 8
Page 61

Page 62

Page 62

Page 63

REPORT TO:   EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 19 APRIL 2023   
SUBJECT: EDUCATION RESOURCES AND COMMUNITIES REVENUE
BUDGET MONITORING TO 31 DECEMBER 2022 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the budget position for Education Resources and
Communities as at 31 December 2022. 
1.2 This report is submitted to Committee in terms of Section III (A) (2) of the
Council’s Scheme of Administration relating to the consideration of capital and
revenue budgets and long term financial plans. 
2. RECOMMENDATION 
2.1 It is recommended that Committee scrutinises and notes the budget
position at 31 December 2022. 
3. BACKGROUND 
3.1 The report highlights those areas of the budget where there is a significant
percentage variance identified at 31 December 2022. 
4. BUDGET POSITION 
4.1 The spend at 31 December 2022 is £22,618,000 against a budget to date of
£23,004,000, giving an underspend of £386,000 as shown in Appendix 1.  
4.2 The Covid-19 pandemic had a significant impact on income and a £500,000
reduction in the income budget for leisure facilities was approved as part of
the budget report to Moray Council 3rd March 2021. The income is recovering
faster than had been predicted and at the end of quarter three there is
£267,000 over achievement on income in leisure facilities.  
Item 9*
Page 63

Page 64

4.3 Other underspends within the service are Additional Support for Learning
training £12,000, school counselling £7,000 and speech and language therapy 
£88,000, with other minor underspends making up the difference. The
underspend in school counselling relates to the difference in funding received
from the Scottish Government and the contract spend following
commissioning of an external provider. The Speech and Language Therapy
contract is currently suspended due to resourcing issues within the NHS
Grampian Speech and Language team, allowing for a review of the contract
scope and specification in advance of the new financial year. 
5 ESTIMATED OUTTURN 
5.1 The estimated outturn for 2022/23 is £29,895,000 against a budget of
£31,029,000 resulting in an estimated underspend for the year of £1,134,000. 
5.2 The main underspends on services are over achievement of leisure income
£310,000,Speech and Language Therapy contract £128,000 and staff savings
from vacancies and appointment below top of scale exceeding budget
£703,000 Appendix 1 includes top level budget lines that incorporate lower
level budgets where there are small under and overspends. The full year
variance figures take account of all budget variances within the high level
budget line.  
6. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement 
Plan (LOIP) 
The Education Resouces and Communities Revenue Budget has 
particular reference to National Outcome 8 – we have improved the life 
chances for children, young people and families at risk. 
(b)  Policy and Legal
The Council has statutory responsibilities to meet educational
needs, the needs of children and young people in need and those it
looks after. 
(c)  Financial implications
The resource implications are set out in this report and at Appendix 1.
The underspend as at 31 December 2022 is £386,000 against a
budget to date of £23,004,000. The estimated year end position is
expenditure of £29,895,000 against a budget of £31,029,000 resulting
in an underspend of £1,134,000. 
(d)  Risk implications
Budget Managers are aware of their responsibilities for managing
budget allocations and approval for any variances will be sought from
Committee in line with the Financial Regulations 
(e)  Staffing implications
There are no staffing implications associated with this report. 
(f)  Property
There are no property implications associated with this report.
Page 64

Page 65

(g)  Equalities/Socio Economic Impact
An Equality Impact Assessment is not needed because the report is to
inform the Committee on budget monitoring. 
(h)  Climate Change and Biodiversity Impacts
No climate change and biodiversity impacts arise directly from this
report. 
(i) Consultations
Lorraine Paisey, Chief Financial Officer and Tracey Sutherland,
Committee Services Officer, have been consulted and are in
agreement with the contents of this report where it relates to their areas
of responsibility. 
7. CONCLUSION 
7.1 That Committee scrutinises and notes the budget position as at 31
December 2022. 
Author of Report: Joanna Shirriffs, Head of Education Resources and
Communities 
Nicky Gosling, Accountant 
Background Papers: with authors 
Ref:    SPMAN-9425411-159 / SPMAN-9425411-160 
Page 65

Page 66

Page 66

Page 67

Education Resources & Communities Appendix 1 Appendix 1
Budget Monitoring Report to 31st December 2022
Service
Revised
Budget 
Budget to
Date 
Actual to
Date 
Variance to
Date  Variance
Full Year
Forecast
Full Year
Variance
£'000  £'000  £'000  £'000 % £'000  £'000
Communities 1,397 1,038 1,026 12 1 % 1,386 11
Culture, Sport & Leisure 4,742 3,394 3,127 267 8 % 4,500 242
Learning Estate 319 225 211 14 6 % 302 17
Additional Support Needs 16,675 12,176 12,061 115 1 % 16,507 168
Business Support Unit 1,675 1,225 1,231 (6) - 1,667 8
Education Resources & Communities Management 107 80 80 - - 107 -
Public Private Partnership 5,728 4,868 4,883 (15) - 5,743 (15)
Education Resources & Communities COVID-19 - (2) (1) (1) 50 % - -
Education Resources & Communities Efficiency
Savings 386 - - - - (317) 703
-
Education Resources & Communities
Total 31,029 23,004 22,618 386 - 29,895 1,134
Item 9*
Page 67

Page 68

Page 68

Page 69

REPORT TO:   EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 19 APRIL 2023 
SUBJECT: EDUCATION REVENUE BUDGET MONITORING TO 31
DECEMBER 2022 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the budget position for Education as at 31
December 2022. 
1.2 This report is submitted to Committee in terms of Section III (A) (2) of the
Council’s Scheme of Administration relating to the consideration of capital and
revenue budgets and long term financial plans. 
2.  RECOMMENDATION 
2.1 It is recommended that Committee considers and notes the budget
position at 31 December 2022. 
3. BACKGROUND 
3.1 The report highlights those areas of the budget where there is a significant
percentage variance identified at 31 December 2022. 
4. BUDGET POSITION 
4.1 The spend at 31 December 2022 is £51,928,000 against a budget to date of
£53,104,000, giving an underspend of £1,176,000 as shown in Appendix 1. 
4.2 Early Learning and Childcare has an ongoing overspend of £413,000, which is
being addressed as part of the review of ELC savings options which is
currently being progressed with a view to reducing this budget pressure in
2023/24. There are underspends on snack and fundraising accounts £47,000,
central maternity and sickness £27,000 and speech and language therapy
contract £22,000. The core Speech and Language Therapy contract is
currently suspended due to resourcing issues within the NHS Grampian
Speech and Language team, allowing for a review of the contract scope and
specification in advance of the new financial year. The snack and fundraising
accounts cover the academic year and will be carried forward as part of ear
marked reserves.   
Item 10*
Page 69

Page 70

4.3 Devolved school budgets are underspent by £1,098,000 at the end of the third
quarter, £298,000 in primary schools and £800,000 in secondary schools. This
position at financial year end is normal with school budgets being spent over
the academic year. Some of the underspends are due to delays in filling
vacancies and will be carried forward at the end of the year. The underspend
is reduced by overspends on oncosts.  
4.4 Education Central Services has an underspend on the Pupil Equity Fund of
£439,000, this funding is ring-fenced and underspends will be carried forward
as part of ear marked reserves.  Work is ongoing with a Quality Improvement
Manager and the Education Scotland Attainment Advisor around this with
officers confident that with robust planning and monitoring this will be
accounted for next session.  In addition variances exist where the budget
position is at financial year end with spend occurring across the academic
year. 
ESTIMATED OUTTURN 
5.1 The estimated outturn for 2022/23 is £75,869,000 against a budget of
£75,653,000 resulting in an estimated overspend for the year of £216,000. 
5.2 There was a reduction in the Early Learning and Childcare specific grant of
£1,093,000 in 2022/23. Savings have been made in the service to cover part
of the reduction in funding leaving an estimated overspend of £400,000. It is
anticipated to make savings in 2023/24 which will reduce the current budget
pressure. This is part of the Early Learning and Childcare external consultant
report being reported to this committee.   
5.3 Primary school oncosts are expected to be £20,000 over budget. Budgets for
schools are based on an average percentage and are reviewed each year, the
overspend relates to an increase in staff joining the pension scheme.
.
5.4 There is an anticipated underspend on period poverty of £24,000 and school
clothing grants £15,000. A position is currently being advertised to support the
development and delivery of period poverty in the authority, which is directly
funded by the Scottish government through specific period poverty funds. 
5.5 Staff savings from vacancies and appointment below top of scale are
anticipated to exceed budget by £139,000. 
6. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement 
Plan (LOIP)
The Education Revenue Budget has particular reference to National
Outcome 8 – we have improved the life  chances for children, young
people and families at risk. 
(b)  Policy and Legal
The Council has statutory responsibilities to meet educational
needs, the needs of children and young people in need and those it
looks after.
Page 70

Page 71

(c)  Financial implications
The resource implications are set out in this report and at Appendix 1.
The underspend as at 31 December 2022 is £1,176,000 against a
budget to date of £53,104,000. The estimated year end position is
expenditure of £75,869,000 against a budget of £75,653,000 resulting
in an overspend of £216,000. 
(d)  Risk implications
Budget Managers are aware of their responsibilities for managing
budget allocations and approval for any variances will be sought from
Committee in line with the Financial Regulations. 
(e)  Staffing implications
There are no staffing implications associated with this report. 
(f)  Property
There are no property implications associated with this report. 
(g)  Equalities/Socio Economic Impact
An Equality Impact Assessment is not needed because the report is to
inform the Committee on budget monitoring. 
(h)  Climate Change and Biodiversity Impacts
No climate change and biodiversity impacts arise directly from this report. 
(i) Consultations
Lorraine Paisey, Chief Financial Officer and Tracey Sutherland,
Committee Services Officer, have been consulted and are in
agreement with the contents of this report where it relates to their areas
of responsibility. 
6. CONCLUSION 
6.1 That Committee considers and notes the budget position as at 31
December 2022. 
Author of Report: Vivienne Cross, Head of Education 
Nicky Gosling, Accountant
Background Papers: with authors 
Ref:  SPMAN-1315769894-390 / SPMAN-1315769894-389
Page 71

Page 72

Page 72

Page 73

Educational Services Appendix 1 Appendix 1
Budget Monitoring Report to 31st December 2022
Service
Revised
Budget 
Budget to
Date 
Actual to
Date 
Variance to
Date  Variance
Full Year
Forecast
Full Year
Variance
£'000  £'000  £'000  £'000 % £'000  £'000
Early Learning and Childcare 5,100 307 619 (312) (102)% 5,500 (400)
Primary Education 30,433 22,652 22,464 188 1 % 30,503 (70)
Secondary Education 33,746 25,421 24,594 827 3 % 33,696 50
Education Central Services 4,649 2,973 2,494 479 16 % 4,589 60
Management 118 88 84 4 5 % 113 5
Efficiency Savings-Education (56) - - - - (195) 139
Education COVID 19 1,663 1,663 1,673 (10) (1)% 1,663 -
-
Educational Services Total 75,653 53,104 51,928 1,176 - 75,869 (216)
Item 10*
Page 73

Page 74

Page 74

Page 75

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 19 APRIL 2023 
SUBJECT: ANALYSIS OF SECONDARY SCHOOL LEAVER ATTAINMENT
2021-2022 
BY:  DEPUTE CHIEF EXECUTIVE: (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the SQA leaver attainment across our secondary
schools and for this data to be scrutinised and noted as part of our improving
outcomes and raising attainment focus.  This is an update to the Initial
Attainment Report for Secondary Schools 2022 previously presented to
Committee on 2 November 2022, with leavers’ update now presented to
Committee at first opportunity following data release in February 2023
including initial positive destinations.   
1.2 This report is submitted to Committee in terms of Section III (D) (1) of the 
Council's Scheme of Administration relating to all the functions of the Council 
as an Education Authority. 
2. RECOMMENDATION 
2.1 It is recommended that Committee: 
(i) scrutinise and note the Senior Phase Leaver Attainment across
our Secondary Schools in Moray for session 2021/2022 with
specific regard to the National Measures for leavers published on
Insight in February 2023; 
(ii) acknowledge identified improvements in performance evidenced
through key measures outlined within this paper; and 
(iii) further note identified actions for improvement arising from
2021/2022 attainment and performance as outlined in initial
analysis of secondary school attainment paper previously
presented to committee on 2 November 2022. 
Item 11*
Page 75

Page 76

3. BACKGROUND 
3.1 Contextual information relating to the examinations in place for session
2021/2022 have been provided in the Initial Analysis of Secondary School
Attainment:  Session 2021-2022 Committee Paper presented for scrutiny and
noting to Education, Children’s and Leisure Services Committee on
2 November 2022 (please see Background, Section 3) 
3.2 This report provides update in relation to Insight data we receive each year for
cohort attainment across S4, S5 and S6 for our school leavers across four key
national benchmarking measures: 
• Improving attainment in Literacy and Numeracy
• Improving attainment for all
• Increasing post-school destinations
• Tacking disadvantage by improving the attainment of lower attainers
relative to high attainers 
3.3  Insight encourages us to take a holistic approach to evaluating attainment and 
achievement that takes into account the performance within Moray across all 
four measures in 3.2 above.  We also use our breadth and depth of SCQF 
level qualifications for leavers as a measure against our virtual comparator. 
3.4 As part of our revised Secondary Improvement Model approach this session
and secondary school visit programme, we continue to discuss performance
with Moray Secondary Head Teachers and collectively through Secondary
Head Teacher meetings, with our Scottish Government Insight advisor and at
school level with in-person visits to schools.  This is in line with our revised
Secondary Attainment and Performance Framework for school support and
challenge, data scrutiny activities and discussion on key actions required and
next steps focussed on improvement. 
3.5 Caution remains with data trends over time whereby this year’s return to a
formal examination diet is a follow on from two very different years of
Alternative Certification Models (ACMs) with Covid-19 impacting on young
people and our school communities.  Schools continue to support young
people as a result of the legacy of Covid-19, with secondary schools reporting
higher levels of absence, concerns in relation to behaviours exhibited by some
young people, mental health and wellbeing concerns and further increase in
Additional Assessment Arrangements (AAA) for examinations.  Some AAA
has resulted in acute accommodation pressures in some of our secondary
schools in planning ahead for SQA Examinations starting in April 2023.   
3.6 Secondary schools continue to support young people as much as possible
through wellbeing, learning and supported study opportunities.  While schools
are offering the latter, it is noted that Secondary Head Teachers report in
much lower than anticipated uptake for sessions offered.  Further signposting
to national e-learning opportunities offered through e-Sgoil and Scholar are
also made by our schools in support of young people as well as wider
interventions including mentoring and targeted learning conversations/target
setting. 
Page 76

Page 77

3.7 Our Best Value Audit Report for Moray highlighted scope for improvement in
levels of attainment for a number of measures; this was extracted from our
attainment data for session 2017/18.  Within this Committee report, data from
2017/18 is noted along with data from 2018/19, 2019/20, 2020/21 and
2021/22 in order to demonstrate progress made to date as well as actions that
are planned for improvement, albeit within very different assessment
processes and operating environments compared to previous sessions when
arriving at final grades, making year on year comparisons unequal. 
3.8 This report will now complete the attainment picture for session 2021/22
where leaver destination data is not available until December of each year,
information appearing on Insight in February 2023.  This report is presented to
Committee at first available opportunity following data release.  For session
2021/22 there were 963 leavers in total (S4: 173; S5: 292;S6: 498) 
4 SENIOR PHASE ATTAINMENT ANALYSIS OVERVIEW – LEAVERS’ DATA 
Improving attainment in Literacy and Numeracy
4.1 This measure presents the percentage of leavers achieving an award in
Literacy and Numeracy at Scottish Credit and Qualifications Framework
(SCQF) Levels 4 and 5 by the end of their school experience in Moray,
compared with pupils with identified similar characteristics across Scotland
(VC - Virtual Comparator) for each of the last five years.  This is shown in
graph form below for Moray (all leavers, percentage attaining Literacy and
Numeracy at SCQF level 4 and 5). 
Percentage of Leavers
Attaining Literacy: 
SCQF level 4: Literacy
remains above the
VC, common with
2021. 
SCQF level 5: Literacy
is above the VC,
highest positive gap
across 5 year trend. 
Percentage of Leavers
Attaining Numeracy: 
SCQF level 4:
Numeracy remains
above the VC,
common with 2021. 
SCQF level 5:
Numeracy is
marginally above the
VC, now positive and
above VC (first time in
5 year trend). 
Five-year analysis:  Moray performance at SCQF level 4 and 5 against Virtual Comparator
Page 77

Page 78

Literacy &
Numeracy Year
% Level 4
Literacy
% Level 4
Numeracy
% Level 5
Literacy
% Level 5
Numeracy
Moray 2022 95.53 93.87 84.32 70.09
VC  2022 94.26 91.21 81.09 69.35
Moray 2021 95.90 93.29 83.39 70.53
VC 2021 94.52 91.57 82.01 70.93
Moray 2020 92.95 88.53 80.88 64.16
VC 2020 93.95 91.62 80.44 69.63
Moray 2019 93.30 87.16 80.46 64.00
VC 2019 93.73 91.60 79.81 65.49
Moray 2018 92.22 87.46 78.38 62.38
VC 2018 93.89 90.24 78.44 65.83 
4.2 Overall, Moray has performed positively and above the Virtual Comparator for 
leaver attainment for Literacy and Numeracy at SCQF level 4 and level 5. 
This year is the first in a five year trend that performance has exceeded the 
Virtual Comparator across all four measures reported above.   
Improving attainment for all
4.3 This measure allows us to examine how different ability cohorts are attaining
in relation to the appropriate virtual and national cohorts.  Attainment is
measured using the tariff scale, which was developed for Insight.  This
allocated a specific number of points to each qualification (including non-
examination, unit-based courses).  More demanding qualifications gain more
points than less demanding ones and in graded courses, a grade ‘A’ is
equivalent to more points than a grade ‘C’ for example, within the same
course 
4.4 Three ability cohorts are identified for each school, the VC, the Northern
Alliance (Regional Improvement Collaborative) and Scotland as a whole (The
National Establishment):  those in the lowest 20% of tariff points achieved,
those in the highest 20% and those that fall within the middle 60% of tariff
points achieved based on the courses they have undertaken and completed. 
Average
Complementary Tariff
Points: 
The lowest 20% are in
line with comparators
overall.   
The middle 60% are
marginally below VC,
Northern Alliance and
Scotland. 
The highest 20% are
below comparators
with gap noted. 
Page 78

Page 79

4.5 Complementary tariff is a score that looks at parity of achievement of young people in
their top five qualifications studied.  It is not affected by the number of qualifications
and units a young person completed; this removes the inequality and anomalies with
different curriculum structures across Scotland of which there are many.  Reasons
included quality of pass and level of study can impact on the overall tariff measure,
requiring schools to continue to work with young people and families in raising
aspirations in order to aim high for positive achievement.   
4.6 Recent work on curriculum choice and innovation, working with Education Scotland in
collaboration with our Moray Secondary Schools and through recent ADES-
Education Scotland Collaborative Improvement event focused on Senior Phase
Curriculum will progress further work on curriculum design for strengthened consortia
working and senior phase offers. 
3-year analysis:  Lowest 20%, Middle 60%, Highest 20% across SCQF levels
Complementary Tariff Year Lowest 20% Middle 60% Highest 20%
Moray 2022 135 568 1,231
VC 2022 133 605 1,290
Northern Alliance 2022 143 628 1,289
National 2022 138 644 1,303
Moray 2021 129 631 1,277
VC 2021 137 638 1,315
Northern Alliance 2021 143 669 1,328
National 2021 144 692 1,339
Moray 2020 117 595 1,284
VC 2020 130 610 1,286
Northern Alliance 2020 142 654 1,321
National 2020 133 657 1,313 
4.7 It is noted that the lowest 20% of leavers are marginally above the VC, the 
middle 60% and highest 20% below the VC, matching performance of pre-
pandemic 2019 data as most recent previous year of an SQA examination diet
(2019:  lowest 20%: 127, middle 60%: 555, highest 20%: 1,205).  Schools
have continued this session to support young people as longer term impact of
the pandemic continues to be realised through attendance, health and
wellbeing concerns reported.  Challenging behaviours exhibited by a minority
of young people require schools to creatively support them and their families,
impacting on resources and staffing capacity.  We continue to work with multi-
agency partners in support of children and families, with increased societal
pressures and demand on partner services impacting on school resources.     
Leaver initial destinations – increased post-school participation
4.8 This measure shows the percentage of young people securing an initial 
positive post-school destination when the leave school at their point of exit in 
S4, S5 or S6. 
4.9 Destination figures reflect choices made by pupils along with opportunities 
available to them upon leaving school.  The availability of particular 
opportunities (e.g. apprenticeships and employment opportunities) extend 
options available to school leavers.  As a result, this may have impact on the 
number of young people progressing on to Further and Higher Education as 
destination pathways.
Page 79

Page 80

Leaver Initial
destinations –
percentage of
school leavers in a
positive
destination: 
Moray in
2021/2022 has
performed above
all key
comparators
(VC, Northern
Alliance,
National), highest
across a 5-year
trend period for
initial positive
destinations. 
Year Moray VC
Northern
Alliance
National
Establishment
2022 96.16 95.87 95.41 95.74
2021 94.08 95.64 95.32 95.48
2020 93.07 93.78 92.99 93.36
2019 92.76 95.30 94.98 95.05
2018 93.62 95.05 94.99 94.40
2017 93.53 94.02 94.39 93.72 
4.10 In Moray, for 2021/2022 we perform above national average at 96.2% 
compared with 94.08% in 2020/2021 and 93.07% in 2019/2020 and for the 
first time in 5  years, Moray is above all key benchmark comparators as 
outlined above.  Nationally, 95.74% of leavers were in an initial positive 
destination compared to 95.48% in 2020/2021. 
Leaver
destinations for
2021/2022: 
Data presented
highlights more
young people
entering
employment
compared with
key comparators. 
Further
Education is in
line with
comparators
overall, Higher
Education below
comparators. 
Page 80

Page 81

4.11 As further outlined in graph form above and in the table below, the number 
of young people entering employment, Further and Higher Education 
contribute most to initial positive school leaver destination figures, with 
percentage of young people entering employment in particular this session as 
an initial positive destination, notably above key comparators at 36.86%.   
Where Covid-19 may have had impact on availability of opportunities for 
young people, this did not restrict prospects for our young people in Moray. 
We continue to work with Skills Development Scotland (SDS) in order to 
strengthen support and advice for young people as they progress on chosen 
pathways to initial post-school destinations. 
4.12 In comparison with the 2020/21 leaver cohort, it is noted that numbers 
entering employment in 2021/22 was notably higher, with drop in numbers 
entering Further and Higher Education also witnessed as highlighted in yellow 
above. 
4.13 Those young people who are unemployed not seeking and unemployed 
seeking are below or in line with key comparators respectively, lower than 
session 2020/21.  Our schools continue to work with key partners through 
pathway planning meetings to ensure pupils at more risk of negative 
destinations are supported, during and post-school.  We continue to reduce 
percentages  in these categories to as near to zero as possible, noting impact 
of wider factors (for example, mental health and wellbeing) on initial positive 
post-school destination of identified young people. 
4.14 Work also continues with key partners including Skills Development Scotland 
and DYW Moray to ensure Moray learners are informed and afforded 
opportunities to progress on to chosen post-school pathways based in 
individual desires and talents.  We continue to analyse our key data on leaver 
dates, destinations and routes to success to support for young people, in 
order that they may succeed in their chosen journeys.
Tacking disadvantage by improving the attainment of lower attainers
relative to higher attainers  
Year Employed %
Further Education %
Higher Education %
Not known %
Personal Skills 
Development %
Training %
Unemployed 
Not Seeking %
Unemployed 
Seeking %
Voluntary W
ork %
Moray 2021/22 36.86 24.40 31.36 0.31 1.66 1.45 1.77 1.77 0.42
VC 2021/22 27.18 26.75 38.21 0.33 0.45 2.75 1.67 2.13 0.53
Northern
Alliance 2021/22 30.84 23.35 38.28 0.66 0.48 1.93 1.63 2.30 0.53
National  2021/22 25.11 25.45 41.27 0.40 0.51 2.92 1.54 2.32 0.47           
Moray 2020/21 27.42 26.62 37.09 0.23 0.46 2.28 2.16 3.53 0.23
VC 2020/21 25.53 24.81 40.91 0.25 0.50 3.58 1.73 2.38 0.31
Northern
Alliance 2020/21 27.47 22.80 41.67 0.46 0.34 2.75 1.89 2.33 0.31
National  2020/21 22.58 23.29 45.11 0.30 0.47 3.67 1.69 2.53 0.37
Page 81

Page 82

4.15 The graph below shows 2021/22 leaver attainment data (using
complementary tariff scores) for Moray against the Virtual Comparator, broken
down into the ten deciles according to the Scottish Index of Multiple
Deprivation (SIMD).  Decile 1 refers to attainment of young people living in
areas with postcodes considered the 10% most deprived in Scotland
according to SIMD.  Decile 10 refers to those young people living in postcodes
identified as the 10% least deprived datazones according in SIMD.  We
continue to monitor the use of SIMD as a measure in authorities where rural
poverty and other wider poverty related factors are of concern; however, these
are not fully considered nationally within SIMD classification. 
Attainment versus
Deprivation - VC 
Performance at
deciles 1, 2, and 5 are
above or marginally
above the VC. 
Performance at
deciles 4, 6, 7 and 8
are marginally below
the VC. 
Performance at SIMD
9 and 10 are below
the VC. 
Larger circle size
represents a greater
amount of young
people within the
SIMD decile. 
4.16 The highest number of young people leaving school in Moray in 2021/2022
were within SIMD deciles 4-8.  It is noted that while performance at SIMD
decile 5 is in line with the VC, some young people in deciles 4, 6, 7 and 8
performed less well in comparison with VC.  Vertical lines within each SIMD
show the range of attainment for young people within each decile, noting both
positive and less favourable attainment for a variety of reasons as noted
previously.  As shown by trend lines, as SIMD decile increases to SIMD 10, a
small attainment gap emerges as the SIMD increase between Moray and the
VC.
Page 82

Page 83

4.17 A similar comparison may also be made against the National Establishment
(Scotland) as shown in graph form below. 
Attainment versus
Deprivation – National 
Performance at
deciles 1 and 2 are in
line with the National
establishment. 
Performance at other
deciles are
marginally below, or
below the National
establishment based
on attainment
contributions of
specific individual/
cohorts of young
people. 
Blue vertical lines
once again indicating
the spread of
attainment. 
4.18 In Moray, we continue to work with our children and young people, and their
families in order to raise aspirations and encourage positive attendance and
engagement.  Legacy impact of the Covid-19 pandemic is noted through
school attendance levels, increase in less favourable behaviours with some
young people impacting on wider school community and secondary school
temporary/short term exclusions.  Following the Association of Directors for
Education Scotland (ADES)-Education Scotland Curriculum Innovation event
in March, we look forward to planning our curriculum for the future, working
further in partnership across our schools and with Moray College UHI to
enhance our curriculum for all.  We continue to participate in key national
reform on the curriculum underway through review based activities, with a
view to maximising achievement of all learners, in graded and ungraded
qualifications and curriculum experiences as we look to the future. 
Breadth and depth of qualifications achieved by leavers
4.19 This measure considers the breadth (number) and depth (SCQF levels
studied) of qualifications achieved by our young people in Moray.  This
demonstrates the suite of qualifications that our 963 leavers in session
2021/22 (increase from 837 leavers in session 2020/21) gained throughout
their Senior Phase by point of exit, whether in S4, S5 or S6 as they reach
school leaving age or natural point of exit from their secondary schooling
based on their chosen pathway and qualifications required.
Page 83

Page 84

4.20 The table below highlights overall performance across key breadth and depth
measures against the VC.  This measures how many qualifications learners
achieved at all SCQF level qualifications (SCQF level 5, 6, 7); this includes
National 5, Higher and Advanced Higher awards as well as others
qualifications, including Skills for Work and National Progression Awards at
level 5.  Key measures are:  
• 1+, 3+, 5+ and 6+ qualifications at SCQF level 5
• 1+, 3+ and 5+ qualifications at SCQF level 6
• 1+ qualifications at SCQF level 7 
SCQF 
level 5
SCQF 
Level 6
SCQF
level 7 
1+ 3+ 5+ 6+ 1+ 3+ 5+ 1+
2022        
Moray 90.1% 76.2% 63.1% 56.0% 60.4% 45.6% 29.8% 21.2%
VC 88.5% 77.2% 65.3% 58.3% 63.1% 49.5% 35.8% 23.3%
2021        
Moray 88.7% 79.3% 65.8% 57.3% 63.9% 49.7% 34.2% 23.7%
VC 89.0% 78.7% 67.4% 60.5% 65.5% 52.0% 37.6% 24.1%
2020        
Moray 87.6% 74.6% 61.9% 55.1% 61.2% 48.5% 34.2% 22.0%
VC 87.6% 76.5% 65.0% 57.4% 63.1% 50.3% 36.8% 22.6%
2019        
Moray 88.6% 74.9% 61.6% 50.3% 58.7% 44.5% 29.5% 18.7%
VC 87.8% 74.0% 60.7% 52.7% 60.6% 46.5% 32.3% 19.1% 
4.21 At SCQF level 5, leavers achieving 1 or more qualification at this level or
above has witnessed positive increase to 90.1% and above the VC.  At other
measures, performance is marginally below the VC.  Across breadth and
depth measures at SCQF level 6, performance is below the VC.  However,
compared with 2019 (as the last year prior to 2022 when formal SQA
examinations were the principal form of assessment in place), all measures
are above 2019 performance as highlighted in yellow above.   
4.22 Through our Secondary School Improvement Model (SIM) partnership
working, secondary schools are moving to pilot alternative timetabling and
curriculum approaches for session 2023/2024.  This includes piloting of seven
SCQF level 5 qualifications in S4 in one of our SIM partnerships as well as
exploration of a wider health and social care pilot option in a further SIM
partnership.  All schools have embraced the SCQF Ambassador programme
working with the SCQF partnership to extend opportunities through wider
awards and accreditation, maximising achievement of Moray’s young people.   
4.23 Data literacy and interrogation has been strengthened as we complete our
Scottish Government Insight Benchmarking strategy timeline and working with
our Education Scotland Attainment Advisor, we continue to monitor use of
additional monies in our school supported through Scottish Attainment
Challenge Pupil Equity Funding and Strategic Equity Funding arrangements. 
Looking to term 4, we look to further review our stretch aims as a measure to
focus improvement activities, following review of the Framework for Recovery
and Accelerating Progress by Scottish Government and Education Scotland. 
Page 84

Page 85

4.24 Further actions for improvement have previously been provided in the Initial
Analysis of Secondary School Attainment:  Session 2021-2022 Committee
Paper presented for scrutiny and noting to Education, Children’s and Leisure
Services Committee on 2 November 2022.  We continue to support our
schools through support and challenge activities and our central quality
improvement framework aligned to our key Quality Indicator Framework, How
Good is Our School? version 4. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Reflective of priorities within the Corporate Plan with particular regard to
(3) provide a sustainable education service aiming for excellence and (4)
day to day service delivery in line with council values of ambitious,
improving and responsive.  With regards to the 10 Year Plan (Local
Outcomes Improvement Plan LOIP), (2) building a better future for our
children and young people in Moray through equity of learning
experience offered across our schools. 
(b) Policy and Legal
There are no legal implications arising from this report. 
(c) Financial implications
There are no financial implications arising directly from this report.  Any
future reduction in funding to schools may directly may adversely impact
on data presented and impact on supports available to maximise
achievement of Moray’s children and young people in our schools. 
(d) Risk Implications
There are risk implications as to how this attainment dataset will continue
to be used as comparator data for the next 3-5 years and may skew
future performance reporting.  The data presented herein reflects year 1
of reversion to an examination based system, differing to the previous
two session’s ACM and the examination process in place during session
2018/2019. 
Schools continue to report concerns regarding behaviours, wellbeing,
mental health and impact on learner outcomes and attainment.  This has
resulted in increased behaviours of concern in schools, with pressure on
partnership capacity impacting on wider supports available to schools. 
As a result, existing resources require to be directed to support young
people individually/in small groups by schools, impacting on wider school
agenda of improving outcomes for individual pupils, groups and cohorts.     
Schools further note increases in Additional Support Needs among
pupils, impacting on number of courses studied and levels of study.  This
has measurable impact on attainment measures outlined above on
individual schools and is anticipated to increase based on Broad General
Education cohort information.  A number of young people, due to their
additional support needs, access a personalised curriculum with
individual targets and outcomes.  Where a number of other local
authorities have dedicated establishments for supporting young people
Page 85

Page 86

with specific SEBN/ASN, this is not reflected fully in comparators
presented due to different operating contexts and limited external
resource offer. 
Uncertainty continues as a result of further impact of the Covid-19
pandemic now being realised as a result of challenging behaviours
exhibited by some young people and need for increased parental
involvement and engagement in supporting schools to reinforce
importance of positive relationships and raising ambition in young
people.  This is noted in breadth and depth measures and aspiration of
young people to achieve as fully as they can, with increased levels of
anxiety noted resulting in lower ambition in courses/course levels studied
in Senior Phase. 
All of the above are likely to have an effect on SQA results and overall
performance data in future years.  Changes in assessing qualifications in
2020 and 2021 as a result of cancellation of examinations as well as
return to examinations this session creates risks relating to accountability
and data comparability.  Further potential changes are planned to our
main awarding body – SQA – as it is redeveloped along with assessment
approaches in the future, altering comparator datasets further. 
(e) Staffing Implications
There are no staffing implications arising directly from this report. 
(f) Property
There are no property implications arising directly from this report. 
(g) Equalities/Socio Economic Impact
An Equality/Socio Economic Impact Assessment is not required as this
report is to inform Committee on performance. 
(h) Climate Change and Biodiversity Impacts
No climate change or biodiversity implications have been determined
due to the scrutiny based nature of activities reported and no findings
related to such implications contained herein.     
(i) Consultations
Senior Officers in Education, Communities and Organisational
Development, Equal Opportunities Officer, Human Resources Manager,
Tracey Sutherland, Committee Services Officer have been consulted
and are in agreement with the contents of this report as regards their
respective responsibilities. 
6. CONCLUSION 
5.1 Committee is invited to consider and note performance of leavers in
Moray for session 2021/22 based on the return to formal SQA
examination diet in May 2022, after two years of Alternative Certification
Models in 2019/20 and 2020/21.  Positive performance is noted in
Literacy and Numeracy at SCQF level 4 and level 5, initial positive leaver
destinations and individual measures within attainment versus
deprivation (SIMD), improving attainment for all (complementary tariff)
Page 86

Page 87

and breadth and depth compared with 2019 as the last year available of
similar comparison due to SQA examination diet presence. 
5.2 Work continues across our secondary schools to support young people,
with wider wellbeing needs emerging as we have emerged from the
Covid-19 pandemic.  Schools continue to work together and with key
partners to ensure young people progress on to positive post-school
destinations and those who require additional support are increasingly
supported by our schools, creative in their approaches using resources
they have available to meet learning, wellbeing, additional support and
behavioural needs.   
5.3 We continue to analyse our data and performance centrally and with our
schools through our quality improvement processes, sharing good
practice and successes while focussing on improving outcomes further
based on data intelligence.   
5.4 This report completes the cycle of performance reporting for session
2021/22. 
Author of Report: Stewart McLauchlan, Quality Improvement Manager 
Background Papers: Initial Analysis of Secondary School Attainment:  Session
2021-2022 Committee Paper 
How Good is Our School? version 4 
Ref: SPMAN-1315769894-398 
Page 87

Page 88

Page 88

Page 89

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 19 APRIL 2023 
SUBJECT: EDUCATION SCOTLAND INSPECTION OF ST PETER’S RC
PRIMARY SCHOOL 
BY:  DEPUTE CHIEF EXECUTIVE: (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the outcomes of the recently published report on a
Moray school following inspection by Education Scotland. 
1.2 This report is submitted to Committee in terms of Section III (D) (1) of the 
Council's Scheme of Administration relating to all the functions of the Council 
as an Education Authority. 
2. RECOMMENDATION 
2.1 It is recommended that Committee: 
(i) scrutinise and note the contents of this report and findings of
Education Scotland following their inspection visit; 
(ii) note that a clear action plan is in place to respond to the areas for
improvement identified and that regular monitoring visits will take
place by the QI team with support and challenge provided to aid
improvement further; and 
(iii) note that following future revisit from Education Scotland
(anticipated February 2024), a further paper will be brought to
Education, Children’s and Leisure Services Committee in order to
provide update on school progress with improvements.
Item 12*
Page 89

Page 90

3. BACKGROUND 
3.1 When a school is inspected by Education Scotland and/or the Care
Inspectorate a report is published which gives commentary on the school’s
performance.  These reports are presented regularly to Committee, where
possible at the first available opportunity after publication. 
3.2 In November 2022, a team of inspectors from Education Scotland visited
St Peter’s RC Primary School.  During their visit, Education Scotland
inspectors talked to parents/carers and children and worked closely with the
Acting Headteacher and staff.  St Peter’s RC Primary School was subject to a
full inspection model visit spanning over five days in total. 
The Education Scotland Inspection team use selected Quality Indicators (QIs)
from “How good is our school? 4th edition” (HGIOS4), rated using the six-
point scale.   
3.3  Education Scotland focus QIs for the Primary school (full inspection model 
inspection) are: 
QI 1.3 Leadership of Change
QI 2.3 Learning, Teaching and Assessment
QI 3.2 Raising Attainment and Achievement
QI 3.1 Ensuring Wellbeing, Equality and Inclusion 
Inspectors make evaluations of these QIs using the six-point scale.  The first
three of these QIs feed directly into the evidence base for the National
Improvement Framework. 
Full establishment inspections also include focus on Safeguarding and
themes from other QIs to ensure Inspectors continue to capture the evidence
needed to promote improvement and provide evidence to inform national
policy development.  These are not assigned a rating and are: 
QI 2.2 Curriculum  (Learning Pathways theme)
QI 2.7 Partnerships  (Partnerships in evaluating the impact of parental
engagement) 
3.4  Following ongoing dialogue between Education Scotland and the local 
authority, Education Scotland published St Peter’s RC Primary School’s 
Inspection Report on 21 February 2023 with the following gradings: 
QI 1.3 Leadership of Change Weak
QI 2.3 Learning, teaching and assessment Weak
QI 3.1 Wellbeing, equality and inclusion Weak
QI 3.2 Raising attainment and achievement Weak 
Page 90

Page 91

3.5  The inspection team found the following strengths in the school’s work: 
• A staff team who have an understanding of the challenges faced by the
community as a result of the pandemic and cost of living;
• Children across the school are focused and keen to learn. Children’s
interactions are respectful and supportive of each other; and
• Staff have created a welcoming, nurturing and caring ethos leading to
positive relationships across the school community. 
3.6  The inspection team agreed the following areas for improvement with the 
Acting Headteacher and Moray Education: 
• Senior leaders and staff should work together to improve leadership
across the school. In doing so, staff should support children, parents and
partners to participate in evaluation activities that improves how the school
works.
• Staff should work together to improve the quality of learning and teaching.
This includes ensuring children are actively involved in learning.
• Staff should improve approaches to planning of learning, teaching and
assessment. There is a need to ensure children’s knowledge and skills
build on what they know as they move through the school.
• All staff should be involved in planning learning that supports better
children with additional support needs. They should ensure that they set
targets that help children make progress in their learning.
• All staff should work together to have a clear focus on raising attainment of
all children. 
3.7  The Education Scotland inspection report and summary of inspection findings 
for the school can be viewed at: 
• Inspection Report
• Summarised Inspection Findings
• Additional Inspection Evidence 
3.8  Following inspection, Education Scotland have advised that the school needs 
additional support and more time to make necessary improvements. 
Education Scotland will liaise with Moray Council regarding the school’s 
capacity to improve.  It is of particular note that the Acting Head Teacher had 
been in post for 5 weeks at the point of the inspection.  Quality Improvement 
(QI) team officers are working closely with the school with a clear action plan 
in place to respond to the areas for improvement identified at 3.6 above. 
Regular monitoring visits will take place by the QI team with support and 
challenge provided to aid improvement further. 
3.9   Education Scotland will return to carry out a further inspection of the school 
within one year of the publication of the inspection letter (anticipated on or 
around February 2024). Education Scotland will discuss with Moray Council 
the details of this inspection and when they return to inspect the school they 
will once again write to parents/carers informing them of the progress the 
school has made.
Page 91

Page 92

3.10 As a result of inspection outcome, an action plan has been developed in 
partnership with the Acting Head Teacher and local authority officers in order 
to prioritise key actions now required.  Since November 2022, key actions 
have progressed, with support from the Primary Advisor and Quality 
Improvement Officer linked with the Associated Schools Group. 
3.11 For reference, the Education Scotland HMIE visit letter published in February 
2023 following visit in November 2022 is contained within Appendix 1.  
4. SUMMARY OF IMPLICATIONS 
a. Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP))
Reflective of priorities within the Corporate Plan with particular regard to
(3) provide a sustainable education service aiming for excellence and (4)
day to day service delivery in line with council values of ambitious,
improving and responsive.  With regards to the 10 Year Plan (Local
Outcomes Improvement Plan LOIP), (2) building a better future for our
children and young people in Moray through equity of learning experience
offered across our schools; supporting ambitious and confident children,
able to reach their full potential. 
b. Policy and Legal 
It is the duty of the Council to secure improvement and the quality of
school education which is provided in schools managed by Head
Teachers and to raise standards of education (Section 8 of Standard in
Scotland Schools Act 2000).   
This report relates to Section 66 of the Education (Scotland) Act 1980,
which concerns the inspection of educational establishments. 
c. Financial implications
There are no financial implications arising directly from this report. 
d. Risk Implications
There are no risk implications arising directly from this report.   
e. Staffing Implications
There are no staffing implications arising directly from this report. 
f. Property
None. 
g. Equalities/Socio Economic Impact
An Equality/Socio Economic Impact Assessment is not required as this
report is to inform Committee on school performance following external
scrutiny/validation activity.
Page 92

Page 93

h. Climate Change and Biodiversity Impacts 
No climate change or biodiversity implications have been determined due
to the scrutiny based nature of activities reported and no findings related to
such implications contained herein.     
i. Consultations 
Senior Officers in Education, Communities and Organisational
Development, Equal Opportunities Officer, Human Resources Manager,
Tracey Sutherland, Committee Services Officer have been consulted and
are in agreement with the contents of this report as regards their
respective responsibilities. 
5. CONCLUSION 
5.1  Committee is invited to scrutinise and note the contents of this report, 
further noting that an action plan is in place with a number of key 
improvement areas having already progressed in relation to the 
November 2022 inspection of St Peter’s RC Primary School.  Ongoing 
local authority support and challenge of school improvement activities 
will continue with further Education Scotland revisit anticipated in 
February 2024. 
Author of Report:  Stewart McLauchlan, Quality Improvement Manager 
Background Papers: Inspection Report    
Summarised Inspection Findings 
Additional Inspection Evidence 
How good is our school? 4th edition 
Education Scotland six-point scale 
Ref:  SPMAN-1315769894-397 / SPMAN-1315769894-396
Page 93

Page 94

Page 94

Page 95

Appendix 1 
St Peter’s Nursery, Buckie 
– EDUCATION SCOTLAND VISIT, NOVEMBER 2022 
Authority commentary on the inspection report 
During the inspection the team of inspectors talked to parents/carers, children and
practitioners. They met with the Early Years’ Service Manager, Continuous
Improvement Officer (East) and the Nursery Manager at the beginning of the
inspection and gathered evidence during the visit to enable them to evaluate aspects
of the quality of leadership and children’s achievements. 
The inspection team found the following strengths in the setting’s work. 
• The manager and practitioners create nurturing, caring relationships with
children and families. This approach ensures children and families feel well
supported. 
• Children who are well-behaved, enthusiastic, enjoy coming to nursery and are
keen to learn. 
• The focus on supporting children’s early mark-making. This is resulting in
children who are keen to experiment with writing. 
The following areas for improvement were identified by the Education Scotland team: 
• The senior leaders, with support from the local authority should use guidance
from national practice frameworks to help develop more robust approaches to
self-evaluation and quality assurance. 
• The manager and practitioners should develop further approaches to planning
to provide appropriately challenging experiences across the curriculum for all
children. 
• The manager and practitioners should develop the quality of the learning
experiences available outdoors. They should create interesting spaces and
experiences to support all children to develop curiosity and creativity. 
The local authority will continue to monitor the settings progress with its quality
processes and will report back to the Committee as appropriate. 
Hazel Sly, Early Years’ Service Manager 
Item 12*
Page 95

Page 96

Page 96

Page 97

1   |   St Peter’s RC Primary School, Moray Council, 5206529 © Crown Copyright
21 February 2023
Dear Parent/Carer 
In November 2022, a team of inspectors from Education Scotland visited St Peter’s RC
Primary School. During our visit, we talked to parents/carers and children and worked closely
with the acting headteacher and staff. 
The inspection team found the following strengths in the school’s work.
• A staff team who have an understanding of the challenges faced by the community as a
result of the pandemic and cost of living. 
• Children across the school are focused and keen to learn. Children’s interactions are
respectful and supportive of each other. 
• Staff have created a welcoming, nurturing and caring ethos leading to positive
relationships across the school community. 
The following areas for improvement were identified and discussed with the acting
headteacher and a representative from Moray Council.
• Senior leaders and staff should work together to improve leadership across the school. In
doing so, staff should support children, parents and partners to participate in evaluation
activities that improves how the school works.
• Staff should work together to improve the quality of learning and teaching. This includes
ensuring children are actively involved in learning.
• Staff should improve approaches to planning of learning, teaching and assessment. There
is a need to ensure children’s knowledge and skills build on what they know as they move
through the school. 
• All staff should be involved in planning learning that supports better children with
additional support needs. They should ensure that they set targets that help children
make progress in their learning.
• All staff should work together to have a clear focus on raising attainment of all children.  
Item 12*
Page 97

Page 98

2   |   St Peter’s RC Primary School, Moray Council, 5206529 © Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using four quality indicators
from How good is our school? (4th edition). Quality indicators help schools, local authorities
and inspectors to judge what is working well and what needs to be improved. Following the
inspection of each school, the Scottish Government gathers details of our evaluations to keep
track of how well Scottish schools are doing. 
Here are Education Scotland’s evaluations for St Peter’s RC Primary
School 
Quality indicators Evaluation
Leadership of change  weak
Learning, teaching and assessment weak
Ensuring wellbeing, equality and inclusion weak
Raising attainment and achievement weak
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on
the Education Scotland website at: 
Reports page | Inspection reports | Education Scotland 
What happens next? 
As a result of our inspection findings we think that the school needs additional support and
more time to make necessary improvements. We will liaise with Moray Council regarding the
school’s capacity to improve. We will return to carry out a further inspection of the school
within one year of the publication of this letter. We will discuss with Moray Council the details
of this inspection. When we return to inspect the school we will write to you as parents/carers
informing you of the progress the school has made. 
David McKellar
HM Inspector
Page 98

Page 99

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE 19 APRIL 2023 
SUBJECT: EDUCATION SCOTLAND INSPECTION OF ST PETERS
NURSERY, BUCKIE 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 The purpose of this report is to invite the Committee to scrutinise and note the
outcomes of the recently published report on a Moray Early Learning and
Childcare (ELC) setting following inspection by Education Scotland. 
1.2 This report is submitted to Committee in terms of Section III (D) (1) of the
Council's Scheme of Administration relating to all the functions of the Council
as Education Authority. 
2. RECOMMENDATION 
2.1 It is recommend that Committee scrutinise and notes the content of this
report. 
3. BACKGROUND 
3.1 When an ELC setting is inspected by Education Scotland a report is published
(by Education Scotland) which gives commentary on the setting’s
performance.  These reports are presented regularly to this Committee, where
possible at the first available opportunity after publication. 
3.2 In November 2022, Education Scotland inspected St Peters Nursery, Buckie,
using the Full Inspection Model. 
3.3 The key features of the full inspection visit model were; 
- The team was composed of 2 inspectors.
- The inspectors spent 3 days at the setting, including time for initial scoping
and feedback.
- The team inspecting Nursery liaised with the team inspecting School. 
Item 13*
Page 99

Page 100

3.4 There was a focus on four Quality Indicators (QI’s) from the How Good is our
Early Learning and Childcare (HGIOELC) quality framework which were
evaluated using the six point scale, namely; 
QI 1.3 – Leadership of change
QI 2.3 – Learning, Teaching and Assessment
QI 3.1 – Ensuring Wellbeing, Equality and Inclusion
QI 3.2 - Securing Children’s Progress 
3.5 A further two Q.I’s were evaluated, although these were not graded; 
QI 2.2 – Learning and development pathways
QI 2.7 – Partnerships: Impact on children and families – parental 
Engagement 
3.6 The inspectors also had a focus on safeguarding as is the case in every
inspection. 
3.7 The inspection findings indicated that St Peters Nursery has the capacity to
continue to improve and Education Scotland will make no more visits in
connection with this inspection. 
3.8 The summary of the inspection report is contained in Appendix 1. The original
inspection report and summary of inspection findings can be viewed at;
https://education.gov.scot/education-scotland/inspection-reports/reports-
page//?id=27401 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
This report relates the priority ‘Provide a sustainable education service
aiming for excellence’ from the Corporate Plan and to ‘Building a better
future for our children and young people in Moray’ from the LOIP. 
(b) Policy and Legal
This report relates to Section 66 of the Education (Scotland) Act 1980,
which concerns the inspection of educational establishments. 
(c) Financial implications
None arising directly from the report. 
(d) Risk Implications
None arising directly from the report. 
(e) Staffing Implications
None arising directly from the report. 
(f) Property
None arising directly from the report.
Page 100

Page 101

(g) Equalities/Socio Economic Impact
An Equality Impact Assessment is not required as this report is to inform
Committee on performance. 
(h) Climate Change and Biodiversity Impacts
None arising directly from the report. 
(i) Consultations
Head of Education (Chief Education Officer), Quality Improvement
Manager (East), Continuous Improvement Officer (West), Continuous
Improvement Officer (East), Principal Teacher Early Years Education
Service and Tracey Sutherland, Committee Services Officer have been
consulted and are in agreement with the contents of this report as
regards their respective responsibilities. 
5. CONCLUSION 
5.1 That Committee scrutinise and note the contents of this report. 
Author of Report: Hazel Sly, Early Years’ Service Manager
Background Papers: 
Ref: SPMAN-1315769894-388 / SPMAN-1315769894-387
Page 101

Page 102

Page 102

Page 103

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 19 APRIL 2023 
SUBJECT: EDUCATION RESOURCES, COMMUNITIES AND EDUCATION
CAPITAL BUDGET 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform Committee of the capital budget position for Education Resources,
Communities and Education as at 31 December 2022, and to advise of
proposed capital budget allocations for 2023/24. 
1.2 This report is submitted to Committee in terms of Section III (A) (2) of the
Council's Scheme of Administration relating to the consideration of Capital
and Revenue budgets and long term financial plans. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee: 
(i) scrutinises and notes the capital budget position for Education
Resources, Communities and Education Services at 31 December
2022; and 
(ii) approves the proposed capital budget allocations (essential
maintenance and design work) for 2023/24. 
3. BACKGROUND 
3.1 At the meeting of Moray Council on 22 February 2022 Council approved the
Capital Plan for 2022/23 (paragraph 4 of the minute refers). 
3.2 This report highlights those areas of the capital budget relating to Education
Resources, Communities and Education budgets where there is a significant
percentage variance as at 31 December 2022. 
3.3 The report also provides a narrative update on major ongoing projects. 
Item 14*
Page 103

Page 104

3.4 The capital budgets (2022/23) for the Education Resources, Communities and
Education Services are listed in Appendix 1. At the meeting of Moray Council
on 1 March 2023 (paragraph 4 of the minute refers) Council approved the
Capital Plan for 2023/24. 
3.5 The capital budgets (2023/24) for the Education Resources, Communities and
Education Services are listed in Appendix 2. Any spend against the libraries
and leisure line – ‘Refurbishment and Upgrade of Pools’ will be dependent on
a number of factors, including the outcome of the Learning Estate Investment
Programme (LEIP) 3 funding bids, and would be the subject of future reports
to this committee. 
4. BUDGET POSITION 
4.1 The total approved capital budget for Education Resources, Communities and
Education for financial year 2022/23 was: 
22/23
£000
Land and Buildings 5,443
Vehicles Plant and
Equipment
460
Total 5,903 
4.2 Planned expenditure to December 2022 was £5,538,000. Actual expenditure
to end December 2022 was £3,648,000. 
4.3 Where current projects are rated as ‘amber’ in Appendix 1 the variance (and
projected variance) in the 2022/23 Capital Plan relates to the following: 
• Findrassie Primary School 
The Findrassie Primary School new build project was allocated
£282,000 capital funding to cover RIBA stage 1-2 concept design work.
On 25 January 2023 this Committee approved a deferment in the
Findrassie new build project for up to 5 years (paragraph 18 of the draft
minute refers). The remaining capital allocation (£82,000) is therefore
not required in 2022/23. There will be a requirement for a small carry
forward of this into 2023-24 to support project review activity and
ensure the project remains in a future ‘ready to re-start’ status and this
will be reported to Council on 28 June 2023. An annual review of the
project deferment decision will be taken at Committee (next Jan 2024)
and capital allocation requirements revisited at that time.     
• Universal Free School Meals 
On 7 November 2022, the Scottish Government announced a 2022/23
budget commitment for £30 million of capital funding for local
authorities to continue the phased expansion of free school meal
support for primary schools.  The funding was to be used in 2022/2023
to support initial investment in school infrastructure ahead of further
Page 104

Page 105

expansion of free school meals for primary school children later in the
parliamentary term. The capital funding allocation for Moray was
£598,000 paid as part of the General Capital Grant in 15 December
2022. The allocation is to fund the design and reinstatement of two
servery kitchens to production kitchens to meet additional demand with
the expansion of free school meals to P6 and P7 children. There has
been insufficient time available to develop the design and tender for the
works so none of the capital allocation has been spent. Carry forward
of the budgeted spend will be recommended in the final report to Full
Council on capital spend 2022/23 on 28 June 2023.       
• Moray Leisure Centre (Vehicles, Plant and Equipment) 
On 14 December 2022 this Committee agreed to allocate £275,000
from the 2022-23 £400,000 capital allocation for Moray Leisure Centre
to cover the costs of an initial design and cost study to support Moray
Leisure Limited plans to expand and develop the facility. Carry forward
of the remaining capital allocation (£104,000) will be recommended
(paragraph 19 of the Minute refers). 
4.4 The capital budgets in Appendix 2 do not yet fully account for the anticipated
full 2023/24 costs of the Elgin High School extension (£950,000), or for
potential 2023/24 costs for Forres Academy and Buckie High School
(currently awaiting the outcome of the Scottish Government Learning Estate
Investment Programme (phase 3) process). These costs will be the subject of
Capital Plan update reports at a future Moray Council meeting. The projected
overall project costs for both the Forres Academy and Buckie High School
projects have previously been reported to this Committee (Special ECLS
Committee 7 November 2022 – paragraph 4 of the minute refers). 
5. MAJOR PROJECTS UPDATE 
Schools Essential Maintenance Programme 
5.1 The total budget for this programme of work is £3.208 million which is made
up of a carry forward of £0.208million from 2021/22 and £3 million from the
2022/23 Capital Plan. This programme of work is a single line within the
Capital Plan. However, the programme has been split into separate budgets
for each individual project as detailed in Appendix I for budget monitoring
purposes. The majority of this work programme is the phased work begun
under the Make Do and Mend criteria, which was to address elements of
schools in Condition D that have the possibility of failing. The scope of each of
the projects is developed in consultation with the school and the contractor.
The reactive nature of this programme does mean that individual project
budgets do vary during the year of the programme. 
5.2 Work to replace defective render with a new insulated render system at
Hythehill Primary School completed on 25 April 2022. 
5.3 Construction work to upgrade the mechanical and electrical systems at
Speyside High School, Cluny Primary School, Forres Academy, New Elgin
Primary School, Anderson Primary School, Burghead Primary School, West
Page 105

Page 106

End Primary School and Kinloss Primary School were completed during the
school summer holidays 2022. 
5.4 Work progressed well on site with no major issues uncovered and very little of
the contingency allowances required. Refurbishment projects, particularly
where these are upgrading mechanical and electrical components, carry 
greater risk of discovering unknowns when on site and this is reflected in the
cost estimates produced for budgeting. The £523k budget line balance is the
contingency allowance across all the projects that was not required to be
expended. 
5.5 Emergency works to replace corroded mains water pipework at Forres
Academy were carried out and completed under this programme of work. This
has resulted in additional budget expenditure under the Forres Academy
Mechanical and Electrical budget heading, however the overall programme of
works remained within the £3.208 million budget. 
5.6 A carry forward of £208,000 from the 2021/22 budget appears in the budget
line under Milnes High School Roof Covering replacement. This carry forward
was taken to support design work and as a contingency for the overall
programme. The replacement of the roof covering at Milnes High School is a
significant budget estimate and is proposed to be carried out in the 2023/24
financial year. 
New Build Project (Lossiemouth High School) 
5.7 The budget is projected to over spend by £32,000 due to re-profiling of the
budget figure from the Quarter 2 Report figure of £608,000 to the Quarter 3
figure now at £232,000. The project remains within the overall budget figure.
The contractor is currently undertaking the making good of the contractual
defects after the one year defects liability period. This is currently behind
programme and will not complete this financial year. This delay in completing
the contractual defects is not having any operational impact on the school. 
New Build Project (Linkwood Primary School) 
5.8 The contractor is currently undertaking the making good of the contractual
defects after the one year defects liability period. This is currently behind
programme and will not complete this financial year. This delay in completing
the contractual defects is not having any operational impact on the school. 
New Build Project (Findrassie Primary School) 
5.9 A preferred Tier 1 contractor had been identified and work was ongoing to
formally appoint in September 2022. However, following the project viability
assessment and an increasing cost model estimate for the project the
Learning Estate Programme Board agreed to the Project Board request to
instruct a project design ‘pause’ to allow the project team to review the design
options and affordability against the continued requirement for future
additional primary school capacity within the Elgin Academy Associated
Support Group catchment.    
Page 106

Page 107

5.10 As stated earlier in this report, on the 25 January 2023, this Committee
approved a deferment in the Findrassie new build project for up to 5 years.
The agreed annual review and reporting of the project will seek to provide an
update to the cost model to include inflationary and other cost contributory
factors.   
Elgin High School Modular Classrooms 
5.11 A total capital budget of £326,000 was allocated to purchase and deliver two
modular classrooms to support an increasing capacity requirement at Elgin
High School until a new permanent extension is delivered for the
commencement of the 2026/27 academic session. The contractor responsible
work was completed in March 2023. There are some internal ICT
requirements to complete but this will have no operational impact on the
school.    
Elgin High School Permanent Extension 
5.12 At Council on 7 December 2022 it was agreed to bring forward capital budget
of £46,030 into Q4 of 2022/23 to engage external consultancy from hub North
Scotland Limited to undertake a feasibility study of options for a permanent
extension at Elgin High School in 2026. A further £46,030 is required within
Q1 of 2023/24 to complete the feasibility study together with up to £30,000 to
support site investigation works. 
5.13 As stated earlier in this report, the capital budgets in Appendix 2 do not yet
fully account for the anticipated full 2023/24 costs of the Elgin High School
extension (£950,000). On conclusion of the feasibility study, an Outline
Business Case on the viable options will be submitted to this Committee in
June 2023 for approval.   
5.14 With the deferment of the Findrassie Primary School project it no longer
qualifies as a Learning Estate Investment Programme (LEIP) – Phase 2
project and the outcome revenue funding support it provides. A February 2023
request to Scottish Government for a formal replacement of the Findrassie
Primary School project with the Elgin High School Permanent Extension
project is awaiting Cabinet Secretary approval.     
Schools Essential Maintenance Programme 2023/24 
5.15 A total capital budget of £3 million has been allocated to support the 2023/24
schools essential maintenance plan. A further budget of £1 million has been
allocated to support design work to inform 2024/25 and future years upgrade
programme. 
Page 107

Page 108

5.16 The proposed schedule for essential maintenance works (Building Element
Replacement line) is as follows: 
School Planned Works
East End Primary Windows and doors replacement
Milnes High School Flat and pitched roofs replacement
New Elgin Primary School Water and heating pipework
Speyside High School Mechanical and Electrical Works
Keith Grammar Fire alarm upgrade
Forres Academy Fire alarm upgrade 
5.17 Although still in discussion the current proposed areas of design work
(Schools BB Investment line) are: 
Schools Planned Works
Burghead, Kinloss and West End
primary schools
Install new heat source, pipework
replacement, fabric energy efficiency
upgrades (read across to other
schools)
Up to 10 primary schools including
East End, Millbank, Seafield 
Upgrade external drainage pipework
Schools priority to be confirmed B condition upgrade
Buckie High School  5-8 year sustainment programme
(scope/timing dependent on outcome
of LEIP 3 funding bid)
Forres High School 5-8 year sustainment programme
(scope/timing dependent on outcome
of LEIP 3 funding bid) 
Universal Free School Meals 
5.18 In addition to the £598,000 that will be recommended to be carried across to
2023/24 to support the expansion of free school meals to P6-7 children, it is
anticipated that Scottish Government will provide a further capital grant
allocation in 2023/24 to support further infrastructure works. A sum of £80
million had been announced by Scottish Government but has yet to be
included in the settlement as the method of distribution has yet to be agreed
by Council Leaders. 
5.19 The work carried out in 2021 to determine the infrastructure works and
associated capital cost estimated that a total of £1,206,152 would be required
to support kitchen and dining room capacity upgrades. A review and update of
these costs will be completed over the coming weeks. 
5.20 The current intention is to complete kitchen and dining spaces design works in
2023/23 but delay building works until Scottish Government provide more
clarity on dates for the expansion of free school meals to the P6-P7 cohort.
Based on the stated ‘end of parliamentary term’ for expansion it is anticipated
that no major works will be undertaken before 2024/25. 
Page 108

Page 109

Early Learning and Childcare (ELC) Expansion 
5.21 It was agreed at Moray Council on 29 June 2022 (para 22 of the minute
refers) to include in the 2023/24 capital budget plans for the outstanding major
and minor ELC infrastructure projects and these are now included in
Appendix 2 with updated costings. The costings remain at risk of further cost
inflation. 
5.22 The proposed schedule for the noted projects (dependent on contractor
interest/availability) is as follows: 
Nursery Planned works Proposed timeline
Kinloss Primary
School Nursery
Fob system to be installed on
nursery doors connected to primary
school; door leading into primary
school classroom to be relocated
outwith nursery area 
Summer holidays 2023 
Findochty
Primary School
Nursery
Kitchen refurb/existing nursery
toilets to be re-configured to include
private nappy changing space (if
possible replacement of flooring to
be included) 
Summer holidays 2023
Portgordon
Primary School
Nursery
Kitchen refurb/existing nursery
toilets re-configured to include
private nappy changing space 
Summer holidays 2023
Rothes Primary
School Nursery
Kitchen refurb/re-configure disabled
toilet area to include nappy
changing space 
Summer holidays 2023
St Peters
Primary School
Nursery
Kitchen refurb/addition of nursery
and staff toilets including private
nappy changing space (if possible
replacement of flooring to be
included)
Summer holidays 2023
Aberlour
Primary School
Nursery /
Aberlour and
Craigellachie
Pre-School
Nursery at
Aberlour
Primary School
Refurbishment works to carried out
on a phased approach from summer
2023. This would require minimal
decanting at Aberlour PS from
August 2023 to a revised outdoor
decant plan for both nurseries to
share on a short term basis. 
Schedule to be confirmed
following further consultation
by Property with the
contractor; it is anticipated
that works will begin
summer 2023 holidays 
Page 109

Page 110

6. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) 
The capital projects referred to in this report support the delivery of the
LOIP outcome of building a better future for our children and young
people in Moray and growing a diverse and sustainable economy, and
are advancing the Corporate Plan priority of reviewing and transforming
the learning environment, and creating a sustainable council. 
(b) Policy and Legal 
The Council has statutory responsibilities to meet educational needs,
the needs of children and young people in need and those it looks
after. 
(c) Financial implications 
The financial implications are set out in this report and at Appendix 1.
Budget managers are aware of their responsibilities for managing budget
allocation and approval for any unavoidable variance will be sought from
the Council in line with the financial regulations. 
(d) Risk Implications 
The school estate (excluding new build) continues to deteriorate. The
level of investment that the Council is able to afford is insufficient to
maintain all schools to B/B standard. The risk of building failures,
temporary closures and/or health and safety continue to be a concern. 
Construction costs are continuing to rise, which will impact on tender
prices received for construction projects, which means additional budget
may be required for projects as they progress. 
(e) Staffing Implications 
There no staffing implications arising directly from this report. 
(f) Property 
There are no property implications other than those detailed in the
report. 
(g) Equalities/Socio Economic Impact 
There are no equalities or socio economic implications associated with
this report.  
Page 110

Page 111

(h) Climate Change and Biodiversity Impacts 
Where heat source replacements are planned a Heating Option
Appraisal in accordance with current procedures will be carried out that
includes renewable heating options. Where wall or roof replacements are
programmed additional insulation to improve the performance of the
fabric will be considered. 
For new build projects we are considering options to meet energy and
zero carbon targets. 
(i) Consultations
The Chief Financial Officer; the Property Asset Manager; the Design and
Construction Manager; The Learning Estate Programme Manager; the
Legal Services Manager; the Equal Opportunities Officer, the Head of
Education and Committee Services Officer have been consulted and the
comments received have been incorporated into the report. 
7. CONCLUSION 
7.1 This report presents the Education Resources and Communities and
Education Capital Works budget to 31 December 2022. It highlights and
provides detail on any variances and provides an update for Members
on agreed major projects. The report also details proposed essential
maintenance projects for 2023/24, and proposed design work in
preparation for future learning estate projects. 
Author of Report: Joanna Shirriffs, Head of Education Resources and
Communities
Background Papers:  
Ref: SPMAN-9425411-161 
SPMAN-9425411-181 
SPMAN-9425411-182 
Page 111

Page 112

Page 112

Page 113

Current
Capital
Plan
2022/23
Actual
Expenditure
to 31
December
2022
Total
Projected
Expenditure
Projected
Variance R/A/G
Land & Buildings
B for condition and B for suitability
Cluny Primary School Mechanical and Electrical Works 49 48 49 0 G
Hythehill Primary School External Insulated Render 319 136 187 132 G
Milnes HS Roof Covering Replacement 208 20 188 G
New Elgin PS Mechanical and Electrical Works 406 267 278 128 G
Speyside High School Mechanical and Electrical Works 370 302 422 (52) G
St Gerardines Drainage 3 3 0 G
Pilmuir Primary School Roof Covering Replacement 9 18 25 (16) G
Forres Academy Drainage 5 5 0 G
Forres Academy Mechanical and Electrical Works 617 883 883 (266) G
Burghead PS Heating and Pipework Upgrade 296 158 175 121 G
Applegrove Primary School Drainage 5 5 0 G
Andersons Primary School Mechanical and Electrical Works 206 225 237 (31) G
Andersons Primary School Drainage 7 18 18 (11) G
West End Primary School Heating Upgrade 305 175 182 123 G
Kinloss Primary School Heating and Pipework Upgrade 400 266 275 125 G
New Elgin PS additional storage area 3 3 (3) G
Forres Academy 68114 Emergency Works 40 44 (44) G
Forres Academy 619429D make do and mend 9 2 (2) G
Millbank Primary Drainage 1 1 (1) G
East End Primary Drainage 5 2 (2) G
Seafield Primary Drainage 2 2 (2) G
Balance 3 523 (520) G
School 3G Pitches
Resurface & rejuvenate 3G pitches in Moray 300 240 245 55 G
Schools Health & Safety
Fire, Safety and Security - Minor Works 100 67 100 0 G
Legionella works 15 6 15 0 G
Schools - Accessibility 46 24 46 0 G
Other Schools
New primary school at Findrassie 282 122 200 82 A
Lossiemouth High School 232 263 263 (31) G
Elgin High School Modular Units 326 141 326 0 G
Elgin High School Extension 46 0 46 0 G
Libraries & Leisure
Condition Surveys - Other Leisure Facilities 40 40 40 0 G
ELC Settings - Kinloss Nursery Access 0 0 5 (5) G
ELC Settings - Findochty Kitchen & Toilets 0 0 5 (5) G
ELC Settings - Portgordon 0 0 7 (7) G
ELC Settings - Aberlour Modular Units 30 31 54 (24) G
ELC Settings - Cullen New Fence 0 4 4 (4) G
ELC Settings - Pilmuir 0 99 100 (100) G
ELC Settings - Keith 0 0 196 (196) G
ELC Settings - Mosstodloch 0 25 25 (25) G
ELC Settings - Rothes 0 0 4 (4) G
ELC Settings - St Peters PS 0 0 1 (1) G
ELC Settings - Mortlach 0 0 0 0 G
Universal Free School Meals 598 0 0 598 A
Allotments 220 5 220 0 G
Vehicles, Plant & Equipment
Libraries & Leisure
Leisure and Libraries Equipment 60 4 60 0 G
Moray Leisure Centre 400 21 400 0 A
5,903 3,648 5,703 200
0 0 (164)
APPENDIX 1
Item 14*
Page 113

Page 114

Page 114

Page 115

Education Capital Plan 2023/24 APPENDIX 2
Heading Capital Plan 2023/24
ELC Settings - Aberlour 1,017
ELC Settings - St Peters 137
ELC Settings - Rothes 131
ELC Settings - Kinloss Nursery Access 20
ELC Settings - Findochty Kitched & Toilets 92
ELC Settings - Portgordon 110
Libraries & Leisure - Refurbishment & Upgrade of Pools 1,900
Libraries & Leisure - Libraries Refurbishment 139
Libraries & Leisure - Equipment 60
Libraries & Leisure - Moray Leisure Centre 700
3G Pitches - Resurface & Rejuvenate 3G Pitches 300
Schools H&S - Schools Legionella Works 15
Schools H&S - Schools Fire, Safety and Security Minor Works 200
Schools Accessability 40
School Estate - Learning Estate Strategy 654
School Estate -  Building Element Replacement 3,000
School Estate - Schools BB Investment 1,000
9,515
Item 14*
Page 115

Page 116

Page 116

Page 117

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 19 APRIL 2023 
SUBJECT: REVIEW OF ADDITIONAL SUPPORT NEEDS SERVICES
(ACTION PLAN 2023-24) 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform Committee of the prioritised Additional Support Needs (ASN)
Services Action Plan (2023-24) to take forward the outcomes of the Review of
Additional Support Needs (ASN) Services over the next 12-18 months as part
of the Council’s Improvement and Modernisation Programme. 
1.2  This report is submitted to Committee in terms of Section III (D) (1) of the
Council's Scheme of Administration relating to all the functions of the Council
as an Education Authority. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee: 
(i) reviews and notes the prioritised ASN Services Action Plan (2023-
24); 
(ii) agrees to receive regular updates on progress against the
prioritised ASN Services Action Plan (2023-24); 
(iii) agrees that Officers bring relevant papers back to Committee at
the appropriate time, where identified actions within the Action
Plan (2023-24) require a Committee decision; and 
(iv) notes that the actions highlighted are a response to identified
risks and barriers, and will provide the necessary support to
enable schools and Early Learning and Childcare (ELC) settings
to engage fully with longer term ASN improvement actions. 
Action plans that extend beyond this initial 12-18 month period
will be the subject of future reports to this Committee.
Item 15*
Page 117

Page 118

3. BACKGROUND 
3.1 On 14 December 2022 Members received a report highlighting the
background to and context for the Review of ASN Services and progress
towards the implementation of the Review outcomes since the Business Case
was approved on 11 August 2021 (para. 17 of the Minute refers). 
3.2 Members noted progress and requested a further report to Committee
outlining prioritised actions, including staff capacity to deliver. A prioritised
ASN Services Action Plan (2023-24) has been agreed in consultation with
staff across Education (including Head Teachers) and Education Resources &
Communities and is included as Appendix 1. 
3.3 The current risks and barriers to progress have informed the development of
the prioritised ASN Services Action Plan and are included in Appendix 1. The
risks include the increase in violence and aggression incidents; the continuing
risk of out of area placement; and staff absence. The barriers include the
operational workload in schools, in particular when planning for individual
curricula; an inconsistent understanding across schools and ELC settings of
support available within settings, central teams and partner organisations; and
ASN staffing structures that do not reflect the current ASN needs profile. The
intention is to prioritise actions that will mitigate risks and remove barriers,
supporting ELC settings and schools to move towards a more stable platform
from which longer terms actions leading to sustainable improvement can be
delivered. 
3.4 The actions and associated timelines take account of capacity within the
teams to deliver against the six priorities. The priority actions will be
progressed by staff working across the central ASN teams, including the
additional temporary resource allocated through Improvement and
Modernisation funding (7 ASN Associated School Groups (ASG) teachers and
2 ASN Trainers), in consultation with Education colleagues in the central team
and in ELC settings and schools. 
3.5 Members also requested a review of the management structure supporting
ASN Services. A review of the management structure is underway and is
included as a priority within the Action Plan. A draft Change Management
Plan for the ASN Teams supporting ELC settings and schools will be brought
to Committee for consideration later this year. 
3.6 The measures that will be used to assess the impact of the priority actions
(and future longer-term actions) are outlined in the Business Case for the ASN
Review and include: 
• Reduction in the number of violence & aggression incidents (linked to
ASN).
• Improved attendance rates for children and young people with ASN.
• Improved staff wellbeing measures (including absence).
• Number of children and young people with ASN educated within their
own communities.
• Improved planning for ASN needs within Education settings, from pre
nursery through to transition to further/higher education. 
Page 118

Page 119

4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) 
This report supports the LOIP outcomes: 
Building a better future for children and young people in Moray:
• A place where children and young people thrive; 
• A place where they have a voice, have opportunities to learn and
can get around; 
• A place where they are able to reach their full potential 
And the Aims of the Corporate Plan to: 
• Provide opportunities where young people can achieve the
potential to be the best they can be. 
(b) Policy and Legal 
There are no policy or legal implications arising directly from this report.
The Council has a statutory duty to make adequate and efficient
provision for the additional support required by each child or young
person for whose school education it has responsibility for, in terms of
the Education ( Additional Support for Learning) (Scotland) Act 2004. 
(c) Financial implications 
There are no financial implications arising from this report. Any financial
implications arising as actions within the Action Plan are progressed will
be the subject of future reports to this Committee. 
(d) Risk Implications 
The strategic risks associated with the delivery of ASN Services are
included in the Action Plan. Operational risks are now managed through
the ASN Management Group, where operational data is reviewed on a
regular basis, and actions agreed to mitigate risks within individual ELC
settings and schools. 
(e) Staffing Implications 
There are no staffing implication arising from this report. Any staffing
implications arising as actions within the Action Plan are progressed will
be the subject of future reports to this Committee 
(f) Property 
There are no property implications arising directly from this report. Any
property implications arising as actions within the Action Plan are
progressed will be the subject of future reports to this Committee 
Page 119

Page 120

(g) Equalities/Socio Economic Impact 
The implementation of the prioritised actions within the ASN Services
Action Plan (2023-24) will help ensure we can effectively meet the needs
of all our children and young people with additional support needs in our
schools and early year’s settings both now and into the future. 
(h) Climate Change and Biodiversity Impacts 
There are no climate change or biodiversity issues arising directly from
this report. 
(i) Consultations 
The Head of Education (Chief Education Officer), the Chief Financial
Officer, Committee Services Officer, the Human Resources Manager
and the Equal Opportunities Officer have been consulted on this report
and their comments have been incorporated. 
5. CONCLUSION 
5.1 This report provides a prioritised ASN Services Action Plan (2023-24)
that will ensure the outcomes of the Review of ASN Services are
progressed in a timely and managed way. Members will receive regular
progress updates on the identified actions, and Committee reports at an
appropriate time on specific actions where a Committee decision is
required to progress. 
Author of Report: Jo Shirriffs, Head of Education Resources & Communities
Background Papers: 
Ref: SPMAN-9425411-169 
SPMAN-9425411-170
Page 120

Page 121

APPENDIX 1
Additional Support Needs (ASN) – Action Plan 2023-24
# Risks/Barriers to Change Priority Actions Delivery Date Status
1 Challenging Operating Environment 
• Increase in ASN Needs
• Significant needs that cannot be
supported within a school
environment
• Increase in incidents of Violence &
Aggression/risk of exclusion
• Planning for individual children
consuming time and resource
• Part-time timetables not meeting
children’s/family’s needs or
legislative requirements
• Risk of Out of Area Placement 
Alternative Provision
1a. Define and resource a Council team to
support education outside of school setting
June 2023 
1.b Develop a strategic procurement
framework to engage third party providers
to support education outside of school
setting 
August 2023 
1c. Identify a location to support education
provision away from school setting
(including alternative to exclusion) 
June 2023 
1.d Develop clear criteria and processes for
accessing alternative provision
June 2023 
2 Resource Allocation Model requires review
• Individual assessment of need is no
longer a suitable distribution
methodology as needs
increase/change. Does not fit with
national best practice.
• Head Teachers/Nursery Managers
highlighting need to be more
flexible in the resource we provide
to support current needs within
each setting. 
Resource Allocation Model (2023-25)
(Allocation of ASN Budget to support
resourcing of ASN within ELC settings and
schools – teaching and support staff)
2a. Resource Allocation Model agreed for
2023-24 (based on current assessed
individual need in ELC settings and schools) 
April 2023 
2b. Resource Allocation Model for 2024-25
co-produced with Nursery Managers/Head
Teachers – formula based taking account of
current information on ASN characteristics,
existing allocations and national
benchmarking
April 2024 
3 Resource Allocation requires review Forres Pilot (April 2023-June 2024) 3a. Develop and implement a revised
staffing structure
August 2023 
Item 15*
Page 121

Page 122

• Principal Teacher ASN allocated to
Primary Schools with enhanced
provision only.
• ASN needs are supported across all
primary schools but do not have
access to Principal Teacher
expertise.
(Look at how staffing structures can
improve support for ASN needs across an
ASG) 
3b. Develop clear criteria for admission to
enhanced provision (including class sizes),
and expectations regarding needs that can
be supported across all primary schools
December
2023 
4 Policies and Procedures do not meet
current needs
• Out of date policies do not reflect
current legislative context.
• Inconsistent knowledge of actions
required to be taken in different
circumstances.
• Needs cannot be met in an
appropriate and timely manner. 
Policy/Guidance – Review and
Development 
(Rolling programme)
4a. ASN Transport Guidance April 2023 
4b. Guidance re the use of /support for
Pupil Support Assistants (PSAs) 
April 2023 
4c. Assistance Dog Guidance May 2023 
4d. Coordinated Support Plan Guidance May 2023 
4e. Violence and Aggression policy and
procedures
June 2023 
5 Staff knowledge and understanding of
approaches to meeting needs is not
consistent across all ELC settings/schools
• Roles and responsibilities in
meeting needs is not clearly
understood across all settings.
• Inconsistent
knowledge/application of
approaches to meeting needs
(increase in Violence & Aggression
incidents)
• Inconsistent understanding of
support available to ELC
settings/schools and when and
how to access that support.
• Negative impact on staff wellbeing
leading to staff absence
Comprehensive Staff training and
Development Programme
(Focus on Staged Intervention in line with
National GIRFEC framework)
5a. Delivery of Overview of Staged
Intervention training across Moray
August 2023 
5b. Programme of training within different
Stages of Intervention agreed for rollout
from August 2024 (compulsory and opt in
training)
June 2023 
Page 122

Page 123

6 Central ASN Team resourcing does not
reflect current needs
• Temporary Management Structure
• ASN structure is not efficient and
targeted towards meeting current
needs 
Central ASN Teams – Future Structure Development of Draft Change Management
including future management structure and
team resourcing
August 2023 
Page 123

Page 124

Page 124

Page 125

REPORT TO:   EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE 19 APRIL 2023 
SUBJECT: LEARNING ESTATE – CLOSURE OF INVERAVON PRIMARY
SCHOOL STATUTORY CONSULTATION REPORT 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 The purpose of this report is to provide an update on the statutory consultation
on the closure of Inveravon Primary School and seek agreement on next
steps. 
1.2 This report is submitted to the Council in terms of Section III (D) (7) of the
Council's Scheme of Administration to consider the closure of schools and
other educational establishments under the control of the Council as
Education Authority. 
2.  RECOMMENDATION 
2.1 It is recommended that the Committee: 
(i) consider the formal consultation report attached as Appendix 1
regarding the closure of Inveravon Primary School; and 
(ii) Taking account of the consultation report,  make a
recommendation for the consideration of Moray Council to close
Inveravon Primary School and reassign its catchment area to
Knockando, Aberlour and Glenlivet primary schools. 
3. DECISION MAKING 
3.1 The Schools (Consultation) (Scotland) Act 2010 requires that local authorities
undertake a formal consultation process whenever changes are proposed to
the location or catchment area of a school; or when a school is being
considered for closure.
Item 16*
Page 125

Page 126

3.2 At its meeting of 24 August 2022, the Education, Children’s and Leisure
Services Committee (para 13 of the minute refers) approved the launch of a
statutory consultation into the permanent closure of Inveravon Primary
School. 
3.3 The consultation proposes that the education provision at Inveravon Primary
School, which is currently mothballed, should be discontinued and that the
catchment area should be reassigned to Knockando, Aberlour and Glenlivet
primary schools. 
3.4 At the end of the consultation period all written submissions, along with the
minutes of the public meeting, were provided to Education Scotland. Both
Education Scotland and officers within the Council’s Education Resources
and Communities Service have written a report on the consultation. The
officer  consultation report is attached as Appendix 1. The Education
Scotland report is contained within Appendix 1 as Appendix I to the
consultation report. 
3.5 As this report is in relation to the permanent closure of a school, the
recommendation of Education, Children’s and Leisure Services Committee
should be considered by Moray Council on 24 May 2023. 
4. DISCUSSION 
4.1 The statutory consultation on the permanent closure of Inveravon Primary
School discussed several options that had been considered for changes to
the school catchment area, with three main options considered to be viable.
These were to rezone the whole catchment area to Knockando Primary
School; to reassign the catchment area between Knockando and Aberlour
primary schools; to reassign the catchment area between Knockando,
Aberlour and Glenlivet primary schools. 
4.2 The statutory consultation took place between 29 August 2022 to 7 October
2022, which covered the required minimum of 30 days term time consultation. 
4.3 In support of the statutory consultation process two in person public meetings
were held on 27 September 2022; one at Inveravon Church at 1.30pm and
the second at Speyside High School Community Centre at 7pm. A further
online meeting was held on 28 September 2022 at 7pm. Records of these
meetings are at Appendices B, C and D. 
4.4 Parental feedback that was provided during the earlier public engagement is
at Appendix E. 
4.5 Pupils at Knockando, Aberlour and Glenlivet primary schools were consulted
on the closure proposal and their responses have been collated at Appendix
F. 
4.6 An online survey was made available to all consultees during the consultation
period and 33 completed the survey. The online survey report is at Appendix
H. 
Page 126

Page 127

4.7 Five written representations were received to the consultation. 
4.8 Officers within the Education Resources and Communities Service and
Education Service have carefully considered all of the responses to the
consultation and have made a recommendation in Appendix 1 (paragraph
14.1) to this report. The recommendation supports the majority community
view and gives maximum parental choice. The recommendation is that the
Council should adopt the proposal to permanently close Inveravon Primary
School and re-assign its catchment area between Knockando, Aberlour and
Glenlivet primary schools.  Children would also continue to receive school
transport to their catchment school where eligible. 
4.9 Free school transport would  continue to be provided to Knockando for all
Inveravon catchment pupils currently attending this school. Free school
transport would be extended to current Inveravon catchment pupils that attend
Aberlour Primary School . All existing primary aged pupils would continue
their education at their current schools. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)
This report supports the LOIP outcomes: 
Building a better future for children and young people in Moray: 
• Healthier Children: children get the healthiest start in life and are
supported to achieve the best possible mental health and
wellbeing and there is equity for vulnerable groups. 
And the aims of the Corporate Plan to: 
• Improve health and wellbeing for the people of Moray. 
(b) Policy and Legal
The Schools (Consultation) (Scotland) Act 2010 has been referred
to and adhered to throughout the statutory consultation process and
this adherence will continue with respect to decisions on the future
of Inveravon Primary School.   
The Schools (Scotland)(Consultation) Act 2010 requires that prior to
any final decision on school closure the report needs to have been in
the public domain for a minimum of 3 weeks. A copy of the full
Consultation Report will be made available to Education Scotland. 
Although no formal title deeds have been discovered, all estate
information indicates that the school building is on land that was
gifted for educational use by Ballindalloch Estate over a century
ago. The expectation is that should the final decision be to close the
school, the land, and by inference the building, will revert to
Ballindalloch Estate ownership.
Page 127

Page 128

The local authority purchased an area of land (0.305 acres) to
extend the subjects in 1926 and accordingly Moray Council retain
title to that upon closure. Given the location of this small area of
land within the main school site it is on its own deemed to have no
intrinsic value. In the event of approval to close Inveravon Primary
School action would be initiated to transfer ownership of this area of
land to the Ballindalloch Estate. 
(c) Financial implications
A decision to close the school would realise an annual saving of
£45,175 (following the 3 year cash conserved salary period). 
A re-opening of the school would require a full remediation of the site,
and significant capital works to the building over future years to achieve
the Moray Learning Estate Strategy aim and Scottish Government
mandate for all schools to be an overall Condition B status or better.
The cost of upgrade has been estimated to be over £206k to support
reopening with a further investment of over £130k over the next 5
years. This capital sum is not within the current capital plan. 
In the event of the closure of Inveravon Primary School, and rezoning
of the catchment to adjacent schools in the Speyside ASG, there would
be  an increase in costs for school transport provision for those children
who would now be entitled to Council-provided transport to Aberlour
Primary School The increase is not expected to be significant and may
be managed within the value of the current Speyside ASG transport
contracts. 
(d) Risk implications
There are no risks associated with this report. 
(e) Staffing implications
Inveravon Primary School is currently in a paired Head Teacher
arrangement with Knockando Primary School. In the event of
Inveravon Primary School closing the implications on Knockando
based Teaching Staff are as per table below. 
FTE (during mothballing) FTE (post closure)
Head Teacher 1.0 (SP4) 1.0 (SP2)
Principal Teacher 1.0 
Head Teacher Relief  0.46
Class Teacher 1.0 1.0
McCrone 0.28 0.28
Total 3.28 2.72 
The Head Teacher would move to SP2 from SP4 – cash conserved for
3 years.  The Principal Teacher would need to be redeployed and
potentially cash conserved for 3 years. 
There are no non-teaching staffing implications should Inveravon
Primary School close.
Page 128

Page 129

(f) Property Impact
Whilst the school has been mothballed, the state of the building has
been maintained as wind and water tight. The building has been
drained down and regular janitor inspections conducted and any
issues, e.g. water ingress, have been addressed. This minimal care
and maintenance regime will continue during and to conclusion of the
statutory consultation process.   
(g) Equalities/Socio Economic Impact
An Equality Impact Assessment (EIA) is a statutory requirement on the
Council to assess the policies and practices necessary to meet the
requirements of anti-discrimination and equalities legislation. It also
affords an opportunity for the Council to consider the impact on the
education service. An assessment has been carried out, as part of the
options appraisal process for Inveravon Primary School. 
The main impact for children in the P1-7 age group is the length of
journey from Inveravon to either Knockando, Aberlour or Glenlivet
primary schools; however, as Inveravon Primary School has been
mothballed since July 2017, the majority of the current pupils are
already making the journey to either Knockando or Aberlour. Should
there be future journeys to Glenlivet these would be of a similar
distance and duration. 
Under the Equality Act 2010 education providers must not treat
disabled pupils less favourably and should take reasonable steps to
avoid putting disabled pupils at a substantial disadvantage. Any
existing arrangements in place for pupils with additional support needs
within the schools affected will continue. As discussed in Appendix 1
Section 10.28 Aberlour Primary School is the enhanced provision hub
for the Speyside ASG, and as such is fully adapted to meet the
requirements of pupils with a range of additional support needs. 
(h) Climate Change and Biodiversity Impacts
A carbon assessment of Inveravon Primary and Knockando Primary,
where the majority of pupils moved to at the time of mothballing, has
been undertaken by the Moray Council Climate Team. 
Overall the carbon impact per pupil is substantially lower at Knockando
– and that includes the pupils on the school roll from the Inveravon
catchment from Aug 2017.  The reopening of Inveravon Primary School
would therefore significantly increase carbon emissions in the future,
outweighing any additional transport emissions associated with longer
pupil journeys.  A closure of Inveravon Primary School is therefore
predicted to lead to carbon savings. 
Page 129

Page 130

(i) Consultations
Senior Officers in Education, Education Resources and Communities,
the Head of Housing and Property, the Head of Environmental and
Commercial Services, the Head of Legal and Democratic Services, the
HR Manager, the Chief Financial Officer, the Legal Services Manager,
the Equal Opportunities Officer, members of the Learning Estate
Programme Board and Committee Services Officer have all been
consulted and are in agreement with the contents of this report as
regards their respective responsibilities. 
6. CONCLUSION 
6.1 The Committee is requested to consider the Consultation Report at
Appendix 1 and the recommendation herein to close Inveravon Primary
School and ask Moray Council, in accordance with the statutory
requirements of the Schools (Consultation) (Scotland) Act 2010, to
approve the closure of the school.   
Author of Report: Andy Hall (Programme Manager (Learning Estate))
Appendices: 
1. Consultation Report - Closure of Inveravon Primary School
Sub Appendices: 
Appendix A 
Appendix A1  
Closure of Inveravon Primary School Consultation
Proposal
Options Appraisal
Appendix A2
Appendix A3
Public Engagement Comments/Suggestions
Financial Template 
Appendix B Public Meeting Record – Inveravon Church (27
September 2022) 
Appendix C  Public Meeting Record – Speyside High School (27
September 2022)  
Appendix D  Public Meeting Record (28 September 2022)
Appendix E
Appendix F
Appendix G
Appendix H
Parental Feedback 
Pupil Engagement 
Online Survey Responses
Online Survey Summary Report
Appendix I Education Scotland Report 
Ref: SPMAN-9425411-184 / SPMAN-9425411-192 / SPMAN-9425411-193 
SPMAN-9425411-194 / SPMAN-9425411-195 / SPMAN-9425411-196 
SPMAN-9425411-197 / SPMAN-9425411-198 / SPMAN-9425411-199 
SPMAN-9425411-200 / SPMAN-9425411-201 / SPMAN-9425411-202 
SPMAN-9425411-203 / SPMAN-9425411-204
Page 130

Page 131

Appendix 1    
CONSULTATION REPORT REGARDING 
THE CLOSURE OF INVERAVON PRIMARY
SCHOOL      
April 2023 
This Consultation Report has been issued by Moray Council in
accordance with the Schools (Consultation) (Scotland) Act
2010 (as amended)        
If you have difficulty reading this document please contact 
Learning Estates Team on 01343 563374 
Item 16*
Page 131

Page 132

Contents 
1. Introduction 
2. The Consultation Process 
3. The Proposal 
4. Educational Benefits Statement 
5. Public Engagement    
6. Written Responses    
7. Moray Council Response to Written and Oral Representations 
8. Education Scotland Report 
9. Alleged Omissions or Inaccuracies and Additional Information 
10. Compliance with Section 9(1) of the Schools (Consultation) (Scotland) Act
2010 
11. Compliance with Sections 11A to 13 of the Schools (Consultation)
(Scotland) Act 2010 
12. Representations to Scottish Ministers in terms of Section 15 of the Schools
(Consultation) (Scotland) Act 2010 
13. Conclusion 
14. Recommendation  
Appendices: 
Appendix A   Closure of Inveravon Primary School Consultation Document 
Appendix A1
Appendix A2
Appendix A3
Options Appraisal
Public Engagement Comments/Suggestions
Financial Template 
Appendix B  In person Public Meeting Record – Inveravon Church (27
September 2022) 
Appendix C  In person Public Meeting Record – Speyside High School (27
September 2022)  
Appendix D  Virtual Public Meeting Record (28 September 2022)
Appendix E
Appendix F
Parental Feedback 
Pupil Engagement
Page 132

Page 133

Appendix G  Online Survey Responses
Appendix H
Appendix I
Online Survey Summary Report
Education Scotland Report   
1. Introduction 
1.1 This report has been prepared following a consultation on the proposal to
discontinue education at Inveravon School, which is currently mothballed, and
reassign its catchment area to that of either Knockando, Glenlivet or Aberlour
primary schools or a combination of these. 
1.2 This report has been prepared in accordance with the Schools (Consultation)
(Scotland) Act 2010 on the above proposal. The objective of this report is to:    
• Provide a record of the total number and a summary of written and oral
responses received during the statutory consultation period; 
• Provide a statement of the Council’s response to those written and oral
representations;
• Provide the full text of Education Scotland’s report and a statement of the
Council’s response to this report; 
• Provide a statement on how the Council reviewed the above proposal
following the representations received during the statutory consultation
period; 
• Provide details of any omission from, or inaccuracy in, the proposal
document and state how the Council acted on it;
• State how the Council has obeyed Section 12 of the Schools (Consultation)
(Scotland) Act 2010 when reviewing the above proposals; and
• Provide officer conclusions and recommendation. 
2. The Consultation Process 
2.1 The requirement for consulting on a relevant proposal relating to schools is set
out in the Schools (Consultation) (Scotland) Act 2010. 
2.2 At its meeting on 24 August 2022 the Education, Children’s and Leisure
Services Committee authorised a statutory consultation regarding the closure
of Inveravon Primary School. 
2.3 The proposal document made clear to consultees that the consultation period
would run from 29 August 2022 until 7 October 2022.  This more than
adequately covered the required minimum of 30 days term time required for
consultation. 
2.4 On 29 August 2022 copies of the proposal document were made available to: 
• Parent Councils of Knockando, Aberlour and Glenlivet Primary Schools;
• Parents of the pupils at Knockando, Aberlour and Glenlivet Primary
Schools;
Page 133

Page 134

• Pupils at Knockando, Aberlour and Glenlivet Primary Schools;
• Parents of pre-school age children living within the Inveravon catchment;
• Staff at Knockando, Aberlour and Glenlivet Primary Schools;
• Trade union representatives;
• Speyside Community Council;
• Glenlivet and Inveravon Community Association;
• Tomintoul and Glenlivet Development Trust;
• Education Scotland; and
• Inveravon Primary School catchment residents 
2.5 A copy of the document was also made available at: 
• Aberlour Library;
• Knockando Primary School;
• Aberlour Primary School;
• Glenlivet Primary School;
• Glenlivet Medical Practice;
• Ballindalloch Post Office;
• Community Centre, Speyside High School; and
• Elgin Library 
2.6 A copy of the document was also available on request from Moray Council
Learning Estates Team. 
2.7 The proposal document was also published on the Council website: 
http://www.moray.gov.uk/moray_standard/page_139703.html 
2.8 Communication regarding the consultation was published on the Council’s
newsroom and social media platforms on 24 August 2022 when a news release
was issued. It was further promoted on social media platforms on 8 September
2022.  
2.9 The consultation was also advertised in the Press & Journal and Northern Scot
newspapers on 9 September 2022. 
2.10 An online survey was available throughout the consultation period. 
2.11 The consultees were also given the option to submit their comments on the
proposal via email to LearningEstate@moray.gov.uk or posted to Community
Support Officer (Learning Estate), Elgin Council Offices. High Street Elgin IV30
1BX 
2.12 Two face-to-face public meetings were held during the consultation period. The
first was held at 1:30pm on Tuesday 27 September 2022 at Inveravon Church,
Ballindalloch AB37 9BA. A further public meeting was held at 7pm on Tuesday
27 September at Speyside High School, Mary Avenue, Aberlour AB38 9QU. 
Page 134

Page 135

2.13 An online public meeting was held on Wednesday 28 September. Anyone
wishing to attend this meeting was able to register their interest by emailing
learningestate@moray.gov.uk. 
2.14 Education Scotland received a copy of the proposal document and attended
both public meetings.  
2.15 At the end of the consultation period, Education Scotland were provided with all
documentation relating to the consultation.  They also visited Inveravon Primary
School, Knockando Primary School and Speyside High School, which included
discussions with parents and pupils.  Following their visit and a review of
relevant documentation, Education Scotland issued a report on the educational
aspects of the proposal.  The report is covered in more detail within Section 8
of this report. 
2.16 Adhering to the statutory requirement this consultation report was published on
the Moray Council’s website on 12 April 2023, in preparation for the Education,
Children and Leisure Services Committee on 19 April 2023, and more than three
weeks, the minimum time required, prior to when the Council is expected to take
the decision on whether to implement the proposal 
3. The Proposal 
3.1 The proposal document, included as Appendix A to this report, was issued to
those individuals and bodies listed under ‘Distribution’ within the proposal
document.  The Proposal Document was also published on the Council
website at:
http://www.moray.gov.uk/moray_standard/page_98109.html#Closure%20of%2
0Inveravon%20Primary%20School 
3.2  The proposal on which the consultation took place was: 
To close Inveravon Primary School, currently mothballed, and re-assign
its catchment area to either Knockando Primary School, a combination of
the Knockando and Aberlour primary schools or a combination of
Knockando, Aberlour and Glenlivet primary schools. 
3.3 The schools that could be impacted by this proposal are; 
• Inveravon Primary School 
• Knockando Primary School 
• Aberlour Primary School
• Glenlivet Primary School 
3.4 The proposal was advanced for the following reasons: 
• At the start of the 2016/17 session the Inveravon Primary School roll was
13 pupils;
Page 135

Page 136

• During the build up to the closing months of the 2016/17 session the school
roll had declined, leading to no children enrolled for the 2017/18 session at
the end of June 2017;
• It was noted that a number of children within catchment were electing to
move to Knockando Primary School;
• In August 2017, due to no children attending the school for the start of the
new 2017/18 session, the Education Service was left with no alternative but
to take the decision to not open the school and in September 2017, the
school was mothballed;
• No parents had chosen to enrol their children at Inveravon Primary School
for the 2017/18, 2018/19, 2019/20, 2020/21, 2021/22 or 2022/23 sessions;
and,
• Although the number of primary school children in the Inveravon Primary
School catchment totalled 15 for the 2022/23 session those families who
have formally indicated their choice did not wish to send their children to
Inveravon Primary School as they have settled elsewhere. 
3.5 An update report on the position at Inveravon School was given to the Education,
Children and Leisure Services Committee on 24th November 2021. The
Committee agreed to the preparation of an options appraisal regarding the future
of Inveravon Primary School. 
3.6 A follow up report was submitted to the Education, Children and Leisure Services
Committee on 24th August 2022 seeking approval to undertake a statutory
consultation on the closure of Inveravon Primary School in accordance with the
Schools (Consultation) (Scotland) Act 2010. 
3.7 The Education, Children’s and Leisure Services Committee agreed to : 
(i) Authorise a statutory consultation with local stakeholders (Parent
Councils, parents, pupils, staff and the local community) on the proposal
to close Inveravon Primary School; and, 
(ii) To receive a further report on the outcome of the consultation in January
2023. 
Due to insufficient time and resource the Moray Learning Estate team were
unable to complete the consultation analysis and draft the Consultation Report
for December 2022 to support Committee meeting in January 2023.   
4.  Educational Benefits Statement 
4.1 In 2009, the Scottish Government set out its Vision for the Future School Estate
in Scotland, in ‘Building Better Schools:  Investing in Scotland’s Future’. 
4.2 In September 2019, this was updated with Scotland’s Learning Estate Strategy
‘Connecting People, Places and Learning’, which was developed by Scottish
Government and COSLA.  This contains ten guiding principles.  Local Authorities
are required to take account of these principles in planning changes to their
school estate, namely: 
Page 136

Page 137

• Learning environments should support and facilitate excellent joined up
learning and teaching to meet the needs of all learners;
• Learning environments should support the wellbeing of all learners, meet
varying needs to support inclusion and support transition for all learners;
• The learning estate should be well-managed and maintained, making the
best of existing resources, maximising occupancy and representing and
delivering best value; 
• The condition and suitability of learning environments should support and
enhance their function; 
• Learning environments should serve the wider community and where
appropriate be integrated with the delivery of other public services in line
with the place principle; 
• Learning environments should be greener, more sustainable, allow safe
and accessible routes for walking, cycling and wheeling and be digitally
enabled; 
• Outdoor learning and the use of outdoor learning environments should be
maximised; 
• Good consultation about learning environments, direct engagement with
learners and communities about their needs and experiences, and an
involvement in decision making processes should lead to better outcomes
for all; 
• Collaboration across the learning estate, and collaboration with partners in
localities, should support maximising its full potential; 
• Investment in Scotland’s learning estate should contribute towards
improving learning outcomes and support sustainable and inclusive
economic growth. 
4.3 In May 2016, Moray Council approved the ‘Schools for the Future’:  A policy for
Sustainable Schools’ in order to monitor schools provision in Moray and ensure
provision continues to meet the needs of learners, parents and the community
and enable the Council to meet its requirements to ensure best value, as per the
Local Government Scotland Act 2003.  This policy contributes to the aim of
ensuring all children and young people in Moray have equality of opportunity in
terms of access to educational provision and facilities.   
4.4 Within this policy, Moray Council set criteria and indicators in determining an
optimum quality education experience which include provision of
accommodation as reported to Children and Young People’s Services
Committee for: 
• The range of curricular and wider school activities available for children to
enable them to achieve in a range of activities for personal and wider
achievement (e.g. physical education, music, art, drama); 
• The ability of the school to cater for children with Additional Support
Needs;
• The school’s ability to provide access to a suitably broad and balanced
curriculum;
• The quality of the physical environment for learning and teaching  
o Condition - minimum standard B  
o Suitability - minimum standard B  
• No more than two composite year groups in a single classroom at primary
school level.  
Page 137

Page 138

• A minimum of four teachers at a primary school. This recognises both the
needs of pupils and the demands on teachers; and.
• Ideally, at least seven classrooms (one for each year group). 
4.5 Key statutory requirements are further subsumed including delivery of 2 hours
minimum Physical Education as part of National standards, compliance with
statutory legislation in relation to school accommodation and Additional Support
Needs, UNCRC and overall extent of on-site accommodation and facilities
(including required general purpose spaces, play and social spaces, staff rest
areas and outdoor spaces). 
4.6 Moray’s vision and strategic direction for all involved in Moray Education as set
out in our Education Strategic Plan and Priorities 2020-2023 – improving
outcomes for all Moray’s children and young people – is underpinned by the core
entitlements of Curriculum for Excellence in order to ensure all children and
young people maximise development in the four capacities:  Successful
Learners, Confident Individuals, Effective Contributors and Responsible
Citizens.  This stems from Early Learning and Childcare, across the Broad
General Education and through into the Senior Phase, working across our
system to ensure our learners progress to positive and sustained post-school
destinations.  Underpinned by our Council values of Fair, Ambitious, Improving
and Responsive we are ambitious to achieve excellence together in benefit of
all Moray’s children and young people. 
4.7 In order to deliver on our Education strategic vision and priorities, all Moray
schools thus work towards: 
• Improving outcomes for all:  help improve levels of children and young
people’s achievements and broaden the range of opportunities for young
people to develop their skills; 
• Curriculum:  provide a quality curriculum and create positive environments
for effective learning and teaching matched to the needs of learners; 
• Learning, teaching and assessment:  create the conditions for greater
personalisation and choice for children and young people with improved
continuity and progression in their learning; create more opportunities for
children and young people to participate in well-judged paired and group
activities; 
• Supporting all learners:  develop a supportive ethos where children and
young people’s learning, personal, social, health and emotional needs
address the care and welfare of children and young people and their
personal and social development.  
• Leadership at all levels:  strong, sustainable schools providing quality
education and access to the full curriculum are central to the achievement
of this vision and delivering these entitlements. 
4.8 As further educational context, Curriculum for Excellence guides us to achieve
transformation in education in Scotland by providing a coherent, more flexible
and enriched curriculum from 3 to 18 firmly focused on the needs of the child
and young person and designed to enable them to become successful learners,
confident individuals, responsible citizens and effective contributors. All children
and young people are entitled to experience:   
Page 138

Page 139

• a coherent curriculum from 3 to 18;  
• a broad general education, including well planned experiences and
outcomes across all the curriculum areas. This should include
understanding of the world and Scotland’s place in it and understanding of
the environment;  
• a senior phase which provides opportunities for study for qualifications and
other planned opportunities for developing the four capacities;  
• opportunities for developing skills for learning, skills for life and skills for
work;  
• opportunities to achieve to the highest levels they can through appropriate
personal support and challenge; and,
• opportunities to move into positive and sustained destinations beyond
school; 
4.9 Educational benefits are considered below for pupils in respect of options
previously outlined in this proposal document. 
4.10 In December 2020, Moray Council approved the approach to the Moray Learning
Estate Strategy, setting out the vision of providing a sustainable education
service aiming for excellence.  As well as improving condition and suitability as
noted in para 4.4 above, among wider outcomes this strategy aims to ensure our
learning estate enriches the learner journey and supports curricular delivery
noting the quality of learning environment as having direct impact on learning
and achievement of children and young people.   
4.11 Ensuring all young people develop in the four Curriculum for Excellence
capacities through the learner entitlements in para 4.8 above would prove more
challenging if Inveravon Primary School were to reopen with a reduced number
of pupils across the Primary age range.  This would also place discrete pressures
on staff, for example in planning for a wide range of needs, year groups and
abilities, in developing the curriculum and managing educational change.  As a
result, multi-stage composite classes can prove challenging to recruit teachers
compared with larger schools where classes have single or few stage composite
arrangements. 
4.12 Pupils attending schools within the Speyside Associated Schools Group in
closest proximity to Inveravon Primary School; Aberlour, Glenlivet and
Knockando Primary Schools, regularly work in pairs and groups on shared
learning tasks and cooperative learning activities.  A school size low in pupil
numbers, for example in a school of 5 or fewer children based on potential future
intake if Inveravon Primary School re-opened would mean that groups would be
curtailed in size restricting activities to those of a paired nature, with little to no
flexibility in change or rotation of participants in pairings or groupings.  Pupils
could be spread multi-stage across P1 to P7, and while benefitting cross-stage
working, this may result in reduced peer challenge in learning or potential for
sibling pairing/groups.  The variety of skills, knowledge and wider experiences
brought to the groups would be further restricted by roll size and may result in
gender imbalances and inequity in provision of a full programme of wider school
activities. 
4.13 In comparison as the smallest school based on the three named closest to
Inveravon Primary School, Glenlivet Primary School operates within a pairing
Page 139

Page 140

under a shared Head Teacher, school roll projections over the next five years
remain near to 20 children on roll, with partnership approaches in place with the
paired school; Tomintoul Primary School.  This includes joined projects and staff
professional and collegiate development activities while both schools retain their
own unique identities.  Children have regular opportunities to self and peer
assess in each school as well as work in stage and cross stage pairings and
groups. 
4.14 In Aberlour and Knockando Primary Schools, children have regular opportunities
to work in cooperative learning groups, on paired and in group activities with five
and three classes formed in each school respectively.  This further supports
discussions and debate with a range of viewpoints and background of learners
contributing to such activities.  Class organisation within each school offers a
blend of individual, group and class learning and teaching over the session. 
4.15 The reopening of Inveravon would prove more restricted for children to develop
skills for learning, life and work with fewer or no opportunities to work with others
of a similar age and stage, which is not possible in a school size low in pupil
numbers, for example in a school of 5 or fewer children based on potential future
intake.  Pupils may miss opportunities to develop wider skills for life in particular
with limited immersion and interaction with a wide range of peers, where levels
of attendance and participation may also impact further on this. 
4.16 In Knockando, a skills framework has been developed following refresh of the
school’s Curriculum Rationale.  This promotes equity of opportunity, supporting
successes and achievement of all pupils within the formal and informal
curriculum.  Children use learning logs to reflect on skills development.  In
Glenlivet, curricular programmes that support sustained development of skills for
learning, life and work have been developed where STEM (Science,
Technology, Engineering and Maths), and the Career Education
Standards/Career Management Skills are specific within the school’s skills
development pathway and staff continually look for ways to ensure children are
challenged and motivated in learning.  As the largest school in the Associated
Schools Group, children at Aberlour Primary School benefit from wider skills
development and transferability through various community projects and whole-
school initiatives supported by partners including Primary Engineer, Christmas
Enterprise, DYW initiatives and Moray Primary Science.  Aberlour Primary
School’s Skills Progression “Skills for Stars” lead to weekly OSCARS which link
to profiling and the Moray Skills Pathway. 
4.17  Collaboration with wider staff in order to ensure a coherent and progressive
curriculum can prove more difficult in a school with low roll size.  As noted with
Glenlivet Primary School paired with Tomintoul Primary School, a progressive
curriculum differentiated to meet the needs of each child with a focus on
engaging and active learning experiences is in place with opportunities for
personalisation and choice across the four contexts for learning.  Rich contexts
for learning including the outdoor areas are embraced with child-led
developments.   
4.18 In Aberlour Primary School, the curriculum supports children to develop in the
four capacities with planned inter-disciplinary learning for transfer of skills and
knowledge with commitment to active learning and purposeful play.  At
Page 140

Page 141

Knockando Primary School, there is a focus on skills development and building
on prior learning through cohesive learner pathways making best use of the
outdoors and local context.  Children are increasingly benefitting from a range
of play contexts that are adult-led, adult-guided or child-initiated.  Pupils are
developing social skills for sharing, co-operation, turn-taking, listening and
organising through play. At Glenlivet Primary School, children have ‘independent
learning time’ each day with child-led and adult-led play.  A dedicated outdoor
space supports development of a range of play and skills-based activities. 
4.19 Strong partnerships across the Speyside Associated Schools Group exist with
previous joint working on moderation, Numeracy, HWB policy and wider
curriculum development.  Each school values community and wider partnerships
for supporting the Developing the Young Workforce agenda and ensuring
children are prepared for the future world of work and employability.  At Glenlivet
Primary School, partnership working further supports skills development and
curriculum enrichment where involvement in partnership projects enables pupils
to build confidence and take increasing responsibility for their own learning – for
example, learning for sustainability, science, expressive arts and literacy.  Key
partnerships with Tomintoul and Glenlivet Landscape, Crown Estates, Spey
Fishery Board and Glenlivet Wildlife group have supported this.   
4.20 In Knockando Primary School, a range of partners and local employers including
Tamdhu Distillery, Knockando Estate, Knockando Athletics Club and the
Shieling Project offer opportunities to learn and be active outdoors.  Pupils at
Aberlour Primary School have opportunities to engage with local employers and
parents as employees for future employability and pathway opportunities,
alongside working closely with partner agencies as the Enhanced Provision
School for the Associated Schools Group.  Schools in the Associated Schools
Group also collaborate, including a week’s residential stay at Abernethy Outdoor
Centre for wider outdoor pursuit experience, team building and transition
support.   
4.21 Larger schools provide greater opportunities for pupil leadership and
involvement in the ethos and wider life of the school as well as provision of a
wider range of clubs and extra-curricular activities.  At Aberlour Primary School,
P7 House Captains and P6 Vice-Captains are elected each year to lead
‘houses’, pupil voice activities and inter-house challenges including sporting
events,as well as contribute to whole school change initiatives.  Community
groups include Eco-schools, Rights Respecting Schools group (successful in
achieving ‘Gold’ status), philanthropic and community engagement
activities.  Staff led a range of clubs and activities for all children including
Bikeability, Running, Languages, Outdoor Learning, Choir, Nurture, Craft,
Netball, Gardening and Leadership. P7 Play Leaders further develop their
leadership skills through the ‘Playground Squad’, leading play activities and
supporting lunchtime interaction sessions for younger pupils. 
4.22 Play leaders at Knockando Primary School have been working with Active
Schools to support play and lunchtime interactions and activities for younger
pupils.  This ensures that all pupils feel included at playtimes and lunchtimes and
for the P6 and P7 pupils involved, this is further developing skills of leadership,
organisation and problem solving.  Other opportunities include Pupil Council,
Global Citizenship, Community groups and wider pupil projects to enhance the
Page 141

Page 142

school and local community.  Lunchtime clubs include Club Doodle, Netball
Club, Book Club and Gardening Club where pupils also engage in
dance/performance, athletics and wider Moray Badge participation. 
4.23 At Glenlivet Primary School, child-led developments have led to enhancements
to school grounds and cross-pollination investigation led to bee-keeping at the
school.  Real-life scientific and environment studies including Citizen Science
research, the Big Wasp survey and RSPB Bird Watch further promote curiosity
among learners, where a range of Monday clubs are also offered including
Health club, STEM club and Rights Respecting School club led by the
pupils.  Through ‘Glenlivet Go Getters’ (Pupil Council) all children make a
significant contribution to school leadership of change and views are taken on
board. Bronze ‘Rights Committed’ accreditation has been achieved at Glenlivet
with the school currently working towards Rights Respecting Schools’ Silver
‘Rights Aware’ accreditation. 
4.24 The range of interactions offered by all schools and the leadership and wider
skills development opportunities presented strengthen capacity to work with
others as part of a team, problem solve, make decisions and increase
confidence in learners.  As part of a peer group of a sufficient size, social
interaction will enable further development of skills for learning life and work and
build self-efficacy and esteem.  A school size low in pupil numbers, for example
in a school of 5 or fewer children based on potential future intake severely
restricts opportunities for team sports, meaningful pupil leadership opportunities,
clubs and other active recreational activities. 
4.25 Aberlour, Glenlivet and Knockando Primary Schools are established as caring,
nurturing and inclusive environments for learning.  Aberlour Primary School as
the largest Primary School in the Speyside Associated Schools Group holds
Gold Rights Respecting Schools status and through their positive relationships
policy, aim to ensure all in the learning community are committed to the school
vision – ‘we show respect and have fun so we can learn from everyone’.  Pupil
achievements are regularly celebrated and ‘OSCARS’ (Our School Can Achieve
Results) focused on the four CfE capacities in para 4.8 above, are awarded to
pupils in recognition of their positive contribution and achievements in learning. 
4.26 Knockando Primary School is a caring and inclusive school, where staff work
hard to get to know pupils and families well, supporting individual needs.  A
relational and restorative approach is taken to positive relationship management
where the school is on the journey to Gold Rights Respecting School status.  The
school’s Positive Relationship Policy has been developed and shared with the
school community with a focus on inclusion, safeguarding, mental and emotional
wellbeing and accessing supports.   
4.27 Glenlivet Primary School has a very caring, nurturing and inclusive ethos with a
strong community identity due to the unique school location.  Individual reflective
portfolios and learning logs support children to reflect on their learning against
the four capacities and development of skills.  Regular reflection against the
school’s ‘Smarts’ is undertaken by children to understand aspects of their own
wellbeing.  Staff actively promote inclusion and equity for all children and due
the to size of school and one large multi-composite class, pupils are grouped by
ability as opposed to stage, strengthening pace and challenge in learning.  In
Page 142

Page 143

collaboration with all children, Glenlivet Primary School has developed a new
Positive Relationships Policy reflecting the United Nations Convention on the
Rights of the Child (UNCRC). 
4.28 Aberlour Primary School has the Primary Enhanced Provision base for children
with Additional Support Needs for the Associated Schools Group.  Most children
attend for part of the time, also attending mainstream classes.  ‘The Rainbow
Room’ provides specialist support for identified young people and support on
group and one-to-one basis.  Multi-agency links are in place with key partners
including Health, Social Work and 3rd sector. 
4.29 At Knockando Primary School, class teachers support all children where
required with support assistant input for targeted need.  Currently the Head
Teacher in class contact time supports in provision of additional Support for
Learning Teacher time, ensuring all children are supported as part of Moray’s
approach to staged intervention.  In Glenlivet Primary School, there is effective
planning to meet the needs of all learners, with clear progression pathways and
universal/targeted interventions where necessary.  A Support for Learning
teacher works with identified pupils over two days per week with Pupil Support
Assistant time for targeted needs. 
4.30 All schools within Speyside Associated Schools Group benefit from their location
in an area of outstanding natural beauty with access to extensive grounds and
countryside.  As a town school, Aberlour Primary School is in close proximity to
Speyside High School as the local secondary school, with access to a range of
external areas including a playing field, outdoor garden area and hard-standing
playground/parking area.  The school currently houses a local authority and
partner nursery.  The school is within walking distance of the secondary school’s
swimming pool, community sport facilities and multi-use games area.   
4.31 The catchment of Knockando Primary School enjoys large grounds with easy
access to woodland, fields, burns and wildlife supporting outdoor learning
contexts.   During snowy weather, the hill next to the school is used as a
sledge/ski run.  The school is well resourced with outdoor playing fields and play
areas and additional multi-use spaces.  With extensive outdoor areas or within
close proximity to wider facilities in the case of Aberlour Primary School,
opportunities for team sports and game-based activities can be maximised with
a number of pupils on the roll of all three schools enabling such activities.  Larger
staffing complement and parent body further increases the likelihood of
interested adults leading a broader range of activities. Glenlivet Primary School
pupils regularly use the woods located behind the school for outdoor learning. 
A community play park organised by the Go Getters funded by Pupil Equity
Funding and other community monies (Paul’s Hill Windfarm and the Glenlivet
and Inveravon Community Association) is used by children during school time
and is available for community use out with school times. 
4.32 Aberlour, Glenlivet and Knockando Primary Schools are committed to the 1+2
languages agenda.  French is offered across all three schools with the addition
of German in P5-P7.  This provides the opportunity to work as a whole class and
in small groups or pairings in participatory learning activities.  Emphasis is on
the spoken word and opportunities are planned through enjoyable activities such
as group and class games, role-play and songs.  Delivery of language learning
Page 143

Page 144

would be restricted within the multi-stage context of a school size low in pupil
numbers, for example in a school of 5 or fewer children based on potential future
intake.  At Glenlivet Primary School, to meet the needs of current children in
school, British Sign Language (BSL) will be delivered as a third language this
coming year instead of German. 
4.33 Aberlour, Glenlivet and Knockando Primary Schools benefit from a very small
amount of Pupil Equity Funding and use this creatively to support identified
children, with interventions reaching further than those where impact is directed. 
Aberlour Primary School focus in on Literacy interventions, Numeracy and HWB
approaches.  Glenlivet Primary School have identified gaps in Health and
Wellbeing and run a successful Breakfast club, improving engagement in
learning.  In order to support Health and Wellbeing for all, swimming lessons
have been provided where half of the school had never swam, building
confidence in swimming, team working and wider mental, physical and social
wellbeing effects.  Knockando Primary School has supported literacy, numeracy
and Health and Wellbeing with the purchase of various learning supports
including additional Pupil Support Assistant hours for targeted support and
Health and Wellbeing inputs.   
4.34 Schools also look outwards and seek to source additional supports and wider
experiences for children.  Heritage Lottery Funding supported Glenlivet Primary
School in a four year programme with a group of artists, significantly developing
children’s artistic and digital technology skills.  Although this project has now
finished, a legacy of skills and equipment remain which Glenlivet continues to
make use of for learning and teaching. 
4.35 Aberlour, Glenlivet and Knockando Primary Schools all have Parent Councils
formed who meet regularly throughout the year.  Aberlour Primary School Parent
Council represent the views and interests of parents and pupils and support
school improvement where there are currently ten parent members.  Glenlivet
Primary School regularly engages with parents and a supportive Parent Council
take an active role in driving forward school improvement.  There is a very strong
sense of community with the school vision ‘success for all’ understood by all. 
Sustainable partnerships with parents and wider community further enrich the
curriculum and children are supported to take an active part in the school and
wider community. 
4.36 At Knockando, an active and supportive Parent Council fundraise for school trips
and activities and also contribute to bringing in specialists to enhance the
curriculum with dance, sport, music, drama and outdoor education.  Parents may
also use their individual skills to support learners through ‘Activity Afternoons’.  
If Inveravon were to re-open then there would be potential for a Parent Council
to operate.  However, with a small pupil cohort there would be a limited number
of families able to participate – particularly where sibling groups may feature –
resulting in greater reliance on a few individuals to support the school in this way.   
4.37 Aberlour, Glenlivet and Knockando Primary Schools are central establishments
within their respective communities with strong links to other organisations
including local churches.  Effective transition programmes and links with other
Associated School Group schools including Speyside High School as the local
secondary school are in place.  Working in collaboration across the Associated
Page 144

Page 145

Schools Group, Head Teachers and schools ensure all children continue to
access a wide range of experiences and activities, ensuring location does not
detract from opportunities available.  Glenlivet, Knockando, Tomintoul and
Craigellachie Primary Schools also work in partnership to organise transition
events throughout the year for Primary 7 pupils, to support team building and
wider skills development in advance of secondary transition.   
4.38 Section 3 of the Standards in Scotland’s Schools etc Act 2000 requires local
authorities to endeavour to raise standards and secure improvement in the
quality of school education provided in our schools for all learners.  It is Moray
Council’s view that the pupils from the Inveravon catchment derive educational
benefits from their current attendance at other larger neighbouring schools.
Formalising the current arrangements would provide a number of such benefits,
judged against both the Moray and National criteria set out above. 
4.39 As all pupils from the Inveravon Primary School catchment currently attend
Knockando Primary School or Aberlour Primary School depending on current
zoning arrangements or parental choice, no adverse effects for those pupils are
expected to arise from the permanent closure of Inveravon Primary School. 
5 Public Engagement 
Public Meetings 
5.1 All parents/carers and stakeholders were invited to discuss the proposal at one
of the two public meetings, or a third online meeting which were scheduled to
be held during the consultation period. 
5.2 The first meeting was held at Inveravon Church on the afternoon of 27
September 2022 and chaired by Programme Manager, Learning Estate. It was
attended by 11 members of the community.  The minutes of the meeting are
attached as Appendix B. 
5.3 A second meeting was held at Speyside High School on the evening of 27
September 2022 and chaired by Programme Manager, Learning Estate. It was
attended by 2 members of the community, who had both attended the earlier
meeting. A record of the meeting is at Appendix C. 
5.4 A third online meeting was planned for the evening of 28th September 2022. It
was attended by 1 member of the community. A record of the meeting is at
Appendix D.    
5.5 During the meetings there were questions and comments regarding 
• The status of the school leading up to the 2016/17 session
• The process that led to the decision to mothball the school 
• The fall in school roll leading up the end of the 2016/17 session
• The community consultation up to and following the mothballing decision
• Maintenance of the grounds at Inveravon Primary School 
Page 145

Page 146

Discussion with Parents (Inveravon Catchment) 
5.6 At the time of the consultation 15 (fifteen) children of primary school age
resided in Inveravon Primary School catchment area. All parents/carers of
Inveravon catchment children were offered the opportunity to provide
comments on the future of the school. During pre-engagement and statutory
consultation parents/carers responded and all indicated a preference to
continue to send their children to their current school rather than Inveravon
Primary School, should it reopen. A collated record of the parent/carer
comments received is at Appendix E. 
Discussion with Pupils 
5.7 As part of the consultation process, Head Teachers at Knockando, Aberlour and
Glenlivet Schools discussed the proposal regarding the closure of Inveravon
Primary School with their respective pupils.   
5.8 Knockando Primary School has 11 children from the Inveravon Primary School
catchment on its current school roll, Aberlour has 4 children from Inveravon
catchment and Glenlivet has no children from the Inveravon catchment. 
5.9 A full breakdown of the pupil responses is at Appendix F. Within the responses
a minority of children expressed an interest in the school reopening. Of these
almost all expressed their preference to remain at their current school if
Inveravon Primary School did reopen.   
Online Survey 
5.10 During the consultation period parents/carers, stakeholders and community
members were invited to take part in an online survey to express their opinion
on the proposal. The survey provided a summary of the proposal regarding the
closure of Inveravon Primary School.  Participants were also given the
opportunity to leave comments regarding the proposal. 
5.11 A total of 33 people completed the online survey and a collation of their direct
responses is provided at Appendix G.  An analysis of the online survey is at
Appendix H.  The analysis of the responses highlighted that 40% (13) of
respondees resided within the Inveravon Primary School catchment, 44% (16)
of respondees were equally split between Glenlivet and Aberlour catchment and
the remaining 16% (4) resided in the Knockando catchment.  The high level
outcome from the online survey was that 13 supported closure of the school, 14
disagreed and 6 did not respond to the specific closure question. Of the 16
parents that completed the online survey, 11 supported the proposal and 5
disagreed. 
Staff Engagement 
5.20 As Inveravon Primary School has not been operational since August 2017 and
mothballed fsince September 2017, teaching staff that were employed at the
Page 146

Page 147

school have been employed at other establishments.  Staff at Knockando
Primary School and Aberlour School were given the opportunity to discuss the
proposal with Education Scotland but none chose to do so.
6 Written Responses  
6.1 During the consultation period between 29 August 2022 and 7 October 2022
representations were invited from statutory consultees and interested parties.
6.2 Officers received 5 written communications. Three responses were received
from individuals in the community. One of these individuals was a parent of a
child who was at Inveravon Primary school just prior to mothballing.  Two of the
responses were from local community groups, the Speyside Area Forum and
Glenlivet and Inveravon Community Association. 
6.3 None of the written responses supported the proposal. 
7 Moray Council Response to Written and Oral Representations   
7.1 The comments received during the consultation period fall into a number of
themes. These have been carefully considered and the Council responses to
these are provided below. 
Statutory Consultation has not been robust, open and transparent 
7.2 A comment was received that the ‘consultation process has not been pursued
with due diligence, especially in establishing the desired qualities for openness
and transparency’ 
7.3 Moray Council do not agree with the assertion that the consultation process has
not been robust, open and transparent. A number of public engagement events
were completed prior to the 24 August 2022 Education, Children’s and Leisure
Services Committee report seeking approval to undertake a statutory
consultation regarding the closure of Inveravon Primary School in accordance
with the School (Consultation)(Scotland) Act 2010. 
7.4 At these pre-consultation meetings the next steps in the mothballing process
were discussed and members of the community were able to ask questions and
contribute future options for consideration. In addition to these public meetings,
suggestion boxes were positioned around the catchment to allow any interested
party to comment on the future of the school. Indeed, the majority of Inveravon
Primary School catchment parent/carer responses were received through this
approach.  This engagement information is contained within the consultation
proposal document at Appendix A. 
7.5 This consultation process has followed the process set out in the Schools
(Consultation)(Scotland) Act 2010 in engaging with all interested parties and
providing every opportunity for community engagement. This Consultation
Report is now made available to all interested parties to review prior to a Council
decision on the future of Inveravon Primary School planned for 24 May 2023. 
Legislation allows for any person to make representations to Scottish Ministers
Page 147

Page 148

within three weeks of the Council taking their final decision to implement a
closure proposal. The detail on the how to do this is at Para 12.5. 
Reduction in School Roll 
7.6 A number of comments made reference to the school roll during the 2016/2017
academic year. An example comment was that the ‘official timeline of recorded
individual pupil departures and enrolments had been reduced to a crude
assertion that parents unanimously transferred their children to other schools
for educational reasons in August 2017’. 
7.7 The Council has maintained throughout that the decision to mothball the school
was the result of a school roll that fell throughout the 2016/2017 academic year.
Although the detail of this was not available at the public consultation,
subsequent analysis of the August 2016 to June 2017 school roll clearly shows
that the roll fell from 13 to zero during this timeframe. 
7.8 The school roll on 21 September 2016 was 13, with the breakdown by gender
and year group shown below. 
SEEMIS data over the period December 2016 to June 2017 shows a gradual
decrease in school roll. Detail of this is set out below. 
22 December 2016  1 x placing request to Knockando Primary School
14 March 2017  1 x placing request to Craigellachie Primary School.
Reason given “more pupils to make transition easier for
secondary school”
31 March 2017  1 x pupil move to school out with Moray
24 April 2017 1 x placing request to Knockando Primary School – no
reason given.  Initially refused but later accepted (12 June
2017) due to class numbers 
17 May 2017   2 x pupils move to school out with Moray
1 June 2017 2 x placing requests to Knockando. Reasons given -
“school is too small - would benefit from being in bigger
school with more children of their own age” and “school is
too small - behind with their work - benefit from being in
bigger school with more children”
12 Jun 2017 1 x placing request to Craigellachie Primary school
reason given “moving house to Dufftown - pupil has
attended Craigellachie before and has peers at the
school”
15 Jun 2017 1 x placing request to Knockando Primary School – no
reason given
20 Jun 2017 2 x placing requests to Knockando Primary School.
Reasons given for both is that if they stayed they would
be the only pupil.
Page 148

Page 149

30 Jun 2017 1 x pupil move to school out with Moray. 
Other than the 2 x placing requests received on 20 June 2017 the reasons
provided for leaving Inveravon Primary school were educational ones. 
The situation was that the school had a roll of zero at the end of the
2016/2017 academic session. 
School Mothballing Process 
7.9 Several comments were received during the consultation period questioning the
mothballing process that Moray Council undertook and the lack of documentary
evidence as to what was formally communicated to Inveravon Primary School
parents prior to this. 
7.10 Moray Council acknowledge that no documentary evidence has been
discovered between the parents/carers of those children still at Inveravon
Primary regarding the decision at the end of June 2017 that the school would
not reopen for the 2017/18 academic session. However, correspondence
between council officers during this period provides an insight into decisions and
points towards a rapidly changing situation as a number of placing requests were
received from parents/carers in June 2017 resulting in a school roll of zero for
the start of the 2017/18 academic session. Although during the public
engagements and later consultation public meetings on the future of Inveravon
Primary School it has been stated by the Moray Council consultation team that
there may have been letters/emails between the Council and/or school in May
and June 2017 that could not now be found, it would appear that there was little
if any formal correspondence during the critical run up to end of year (June 2016)
period as the Education Service at that stage had no intention to not open
Inveravon Primary School at the start of the 2017/2018 academic session.   
7.11 Email correspondence dated 15 Jun 2017 between Education (Head of Schools
and Curriculum Development) and Legal Services requested advice following
receipt of placing requests from the parents/carers of the remaining 2 children
on the school roll requesting a move to Knockando for start of 2017/2018
academic session. The email states that “the roll at Inveravon primary has been
dropping of late to the point that the last 2 remaining children will move to
Knockando, effectively ‘mothballing’ the school.  This has happened very quickly
with parents, unfortunately, informing teaching staff yesterday” 
7.12 Email correspondence dated 19 Jun 2017 between Human Resources and
Education to discuss a visit to discuss the impact on school staff with a forecast
school roll of zero for the start of the 2017/2018 academic session. 
7.13 Letter dated 27 June 2017 between Education Services and Principal Teacher
informing them of compulsory transfer to Aberlour Primary School at start of
2017/2018 academic session as result of zero school roll at Inveravon Primary
School. 
Page 149

Page 150

7.14 Email correspondence dated 27 June 2017 between Human Resources and
Head Teacher, Inveravon Primary school detailing the redeployment of other
staff at the school for the 2017/2018 academic session. 
7.15 Email dated 3 July 2017 between Public Relations and Education seeking
approval for press release that stated “given the low numbers at the school the
remaining parents decided to seek placings at Knockando Primary. The council
has accommodated these requests and provided transport. Staff have been
redeployed within the school system locally. A report will be submitted to
councillors early in the next session setting out options for the school’s future” 
7.16 Due to the zero school roll at Inveravon Primary School for 2017/2018 academic
session the Moray Council’s Children and Young People’s Services Committee
agreed on 23 August 2017 for a consultation to proceed with respect to the
mothballing of Inveravon Primary School.  A consultation event was be held at
Inveravon Primary School on Monday 25th September at 7pm to discuss the
mothballing. 
7.17 The report to the Children and Young People’s Services Committee on August
2017 records that in May 2017 the Head of Schools and Curriculum
Development and the Business Support Team Manager met with parents and
staff of both Inveravon and Knockando primary schools to answer concerns over
falling school roll at Inveravon Primary school and stated that “parents were
assured that as long as there were pupils on the roll at Inveravon there would be
no decision to mothball or otherwise”.     
Proposal to close the school is financially driven 
7.18 A number of written and oral comments during both the engagement and the
follow up statutory consultation stated that Moray Council were seeking to close
Inveravon Primary School for financial reasons. The Council do not agree with
this opinion and argue that the closure proposal is based on school roll and
educational benefit. 
8.1 During both the pre-consultation engagement and the consultation the majority
view of parents/carers within the Inveravon Primary School catchment was that
if the school were to reopen they would not move their children from their current
schools. A similar response from children from Knockando, Aberlour and
Glenlivet primary schools was that they would not wish to leave their current
schools should Inveravon Primary School reopen.     
8.2 Education Scotland back up the education benefits statement and their report
highlights that children currently benefit from working with larger peer groups
aligned to their age and stage. Their report also concluded that the predicted
school roll in the wider area makes it unlikely that all four primary schools
affected by this report could be sustained.   
Staff changes during 2016 and 2017
Page 150

Page 151

7.19 A number of comments were received during the consultation period, although
not from parents, that the staff changes that took place during the 12 months
leading up to the mothballing of the school were somehow engineered by the
Council and resulted in a “weakening of the school’s teaching provision” which
“significantly damaged its educational efficacy”. A request was made to provide
more detail over the staffing changes. 
7.20 The Council refute the assertion that staffing changes at Inveravon Primary
School were engineered. Teaching staff leave for a number of reasons such as
career progression or seeking out new challenges.  Moray Council cannot stop
career development or staff desire to move on, but do work to support schools
where this may have happened with backfill and new appointments.  Schools
may wish to keep teachers they hold in high regard but this is out with the local
authority control and down to individual staff wishes.  The Council continue to
support recruitment to posts and staff professional development but at times
have a limited supply available. The following paragraphs provide more specific
detail that is requested on the circumstances of staff changes at Inveravon
Primary School in 2016 as requested during consultation. 
7.21 On 5 May 2016 Education Services informed Inveravon Primary School
parents/carers that the Head Teacher had been appointed, following the
standard recruitment process, to become Head Teacher for Linkwood Primary
School, a new 450 place primary school that was at that time in construction. An
acting Head Teacher position was advertised and while the process for recruiting
for a permanent Head Teacher was underway the appointment of an Acting
Head Teacher for Inveravon Primary School was made on 29 June 2016. 
7.22 In May 2016, the Inveravon Primary School Principal Teacher, after another
recruitment process, was appointed Head Teacher at Botriphnie/Newmill and a
replacement Principal Teacher appointed. 
7.23 In19 December 2016 the process for recruitment of permanent position Head
Teacher at Knockando and Inveravon was unsuccessful in finding a long term
suitable candidate to appoint. The Acting Head Teacher remained in post while
the recruitment process was reset. 
School building condition 
7.24 A number of comments were made that the condition of the school had been
allowed to decline during the period that it has been mothballed. One such
comment is that ‘we note that certain elements of the condition of the building
have deteriorated from condition C to D during the time of indecision by Moray
Council. In essence the failure to maintain the building essentially means the
building is no longer ‘fit for purpose’ as an educational establishment’ 
7.25 At the meeting to discuss the school mothballing in September 2017 it was
explained that the school building would be maintained in a wind and water tight
condition – which Moray Council have done. During this same period, due to
budget constraints, Moray Council has had to prioritise building maintenance
across the school estate and focus on building fabric and services that had a
Page 151

Page 152

high risk of closure to an operational school. This policy of ‘make-do-and mend’
implemented a regime of affordable controlled management of those condition
factors that had fallen from Condition C (Poor) to Condition D (Bad), as defined
within the Scottish Governments Condition Core Fact guidance, and had a high
closure risk if not addressed. 
7.26 A full condition survey of Inveravon Primary School was completed in 2022 and
graded the overall school Condition as C (42.27%). Within that overall grading
a number of factors were identified as Condition D. A comparison between the
survey conducted in June 2022 and the previous one in April 2013 is set out in
the table below. 
Roofs
Floors
Ceilings
Externals
Internals
Sanitary
Mechanical
Electrical
Decoration
FFE
Externals
Outdoor
Sports
Overall
Grading
Weight
(%)
15 7 1 20 7 5 14 11 2 5 10 3  
April
2013
B B B B B B D D B B C N/A 59.54% C
June
2022
C D C C B C D D C B D N/A 42.27% C 
7.27 During the 9 year interval between condition surveys although a number of
areas have declined from B to C, and in one case B to D, this managed
deterioration repeats a similar pattern to other schools in Moray, schools that
have not been mothballed for nearly 6 years. This is not an ideal situation, but
as previously explained is as a result of the ‘make-do-and-mend’ approach
which has been applied across the school estate. 
School inspection reports not being made public 
7.28 One written respondent made reference to the lack of access to school
inspection reports and that “appropriate detailed documentation has not been
put into the public domain to allow interested parties to track the apparent
educational decline of Inveravon Primary School in 5 years from a position of
outstanding excellence”     
7.29 Inveravon Primary School was last inspected by Education Scotland in
November 2011 with the report published in January 2012. The public report
was shared with parents/carers. The evaluation for Inveravon Primary School
were, against the three important quality indicators, as follows: 
Learners’ experiences  excellent 
Improvements in performance  very good 
Meeting learning needs  very good 
No other formal inspections were undertaken by Education Scotland between
2011 and 2017. Although Quality Improvement Officers have provided support
to Inveravon Primary School to continue to improve they did not undertake any
formal inspections and therefore there is no additional documentation available
to publish in the public domain. 
Page 152

Page 153

7.30 The premise in the written response that there was an “apparent educational
decline” at Inveravon Primary School between 2012-2017 is not evidenced and
is therefore only an opinion that is not supported by Moray Council. 
7.31 The decision to mothball the school and the current proposal for school closure
does not question the past educational performance of Inveravon but rather
reflects the situation in June 2017 – when the school roll fell to zero - and the
current situation where parents/carers in catchment, who have expressed an
opinion, have no desire to move their children to Inveravon if the school were to 
reopen.     
Status of School Website 
7.32 A number of oral and written responses made reference to the fact that the link
to the Inveravon Primary School website was removed from the Moray Council
website at or just before mothballing in September 2017, therefore depriving
potential parents/carers from identifying Inveravon as their primary school of
choice. 
7.33 The Council acknowledge that the website link should not have been removed
from the Council website and have apologised for this at pre-consultation and
consultation public meetings. It was an honest error by the Council officers at
the time and nothing more. As soon as the Moray Learning Estate team were
made aware of this the website was updated and the school reinstated on the
school list.. 
7.34 The Council accept that as a result of the website not being available some
prospective parents in the local area may have not been aware of the school
situation. However, the Council do not believe that awareness of the school
situation would have only been through the website. The dual
Inveravon/Knockando Head Teacher remains extant and they were aware of
the status, the Parent Council at Knockando are also aware (a  number of
members have been and are Inveravon residents) and it is assumed than within
a small community the situation with the ‘local’ school would be shared by word
of mouth. 
7.35 Whether an active website would or would not have made new Inveravon
catchment parents/carers aware of the option to request to send their children
to Inveravon Primary School, and potentially resulted in a viable school roll at
some stage over the last 5 academic sessions, cannot be proven either way.     
Status of Parent Council funded school assets 
7.36 A number of oral and written comments made reference to the removal from the
school site of items that had been purchased by the parent council without
permission and described the actions “as the council’s wanton ‘vandalism’ of
the amenities in the school grounds following mothballing”. 
Page 153

Page 154

7.37 This issue was first raised at a meeting with the community on 25th October
2017 and subsequently in an MP Enquiry. A verbal response was provided to
the meeting and a written response to the MP from the then Head of Lifelong
Learning, Culture and Sport dated 26 October 2017. 
7.38 The letter stated that the equipment had been removed by a janitor who was on
site to collect materials that were not to be left on site while the school was
mothballed and to supervise a team of young people undertaking ground
maintenance tasks as part of their community service orders. The janitor noted
the outdoor equipment and decided this could be put to good use elsewhere.
Despite permission to remove the equipment being denied by the Education
Resource Manager at the time he went ahead with removal. 
7.39 In the letter responding to the MP enquiry it was stated that Moray Council did
offer at the community meeting on 25 October 2017 to return the equipment and
reinstate the ground to its original condition. Although the equipment was
returned to the site, it is unclear why it was not reinstated as the Moray
consultation team can find no further correspondence on the issue. The
dismantled equipment is currently stored inside the school building.   
7.40 It was noted in the letter that the equipment had been gifted to the school by the
Parent Council. However, once the equipment had been gifted to the school it
became the property of the school and therefore Moray Council. 
7.41 Should the decision be to close the school there is an extant request from a
Glenlivet community group to move and install the outdoor equipment within the
grounds of Glenlivet Primary School. The Council are supportive of this request. 
Full rezoning to Glenlivet 
7.42 A number of written comments made reference that in the event of a closure of
Inveravon Primary School that there was no option to fully rezone the Inveravon
catchment to Glenlivet Primary School. It has been stated that “the fact that the
rezoning options for the children of Inveravon precludes them from going to
Glenlivet Primary School (the other school within our parish) is most concerning.
Some Inveravon children will have to travel further to school each day and in
winter especially, the B9008 to Glenlivet is kept in reasonable condition, whilst
the B9102 is much more likely to be closed with drifting snow” 
7.43 During the 2016/17 school roll decline no placing requests were received to
transfer children to Glenlivet Primary School. Currently none of the
parents/carers and children (currently 15) living within the current Inveravon
Primary School catchment attend Glenlivet. The parent/carer feedback received
during engagement and consultation is that if Inveravon Primary School were
to reopen then they would not chose to send their children there. It is the opinion
of Moray Council that the same position would be taken should the Inveravon
Primary School catchment be fully rezoned to Glenlivet Primary School. 
7.44 All Inveravon Primary School catchment children have been travelling to both
Knockando (free transport) and Aberlour (private arrangements) primary
schools since August 2017 without any issues notified. 
Page 154

Page 155

7.45 With any of the closure options proposed parents/carers within the Inveravon
Primary catchment are still able to submit a placing request to send their
children to Glenlivet Primary School and provided there a suitable places
available then this is highly likely to be accepted. However, they would not be
eligible for free transport.       
Community support for a school ignored 
7.46 There were a number of oral and written comments that opined that the
community support for the school was ignored by the Council during
mothballing, public engagement and consultation. 
7.47 The strong support for the school by a small but dedicated community group
has been and is acknowledged. If there was a viable school roll at Inveravon
Primary School (and current policy is that operational viability is reviewed if a
school roll falls below 15) then re-opening the school would be a serious
consideration. However, there is no desire by parents/carers within the
Inveravon catchment to move their children to Inveravon Primary School were
it to reopen. A school cannot reopen if it has no pupils, no matter if there is a
community desire for it to do so. 
7.48 The expectation is that the land ownership, and by inference the school building,
will transfer to Ballindalloch Estate in the event of school closure. The Education
Scotland report states that “should the proposal (to close the school) be
approved it will be important for Moray Council, Ballindalloch Estate and
community organisations to work together to find an appropriate use for the site
and building”. The Council acknowledge and agree that this would be the next
step should the school close. If this is the outcome then the community use
options proposed during public engagement and consultation have been
collated and will be shared with Ballindalloch Estate in order to facilitate any
early discussions on future use. 
8 Education Scotland Report   
8.3 In line with the Schools (Consultation) (Scotland) Act 2010, a report was
produced by Education Scotland on the educational aspects of the proposal. 
The full report is attached as Appendix I. 
8.4 The report from Education Scotland was prepared by His Majesty’s Inspectors
of Education (HMIs) in accordance with the terms of the Schools
(Consultation)(Scotland) Act 2010. The purpose of the Education Scotland
report is to provide an independent and impartial consideration of Moray
Council’s proposal to close Inveravon Primary School. 
8.5 HMIs considered: 
• the likely effects of the proposal for children and young people who live in
the catchment area of the school;
• any other likely effects of the proposal;
Page 155

Page 156

• how the council intends to minimise or avoid any adverse effects that may
arise from the proposal;
• the educational benefits the council believes will result from implementation
of the proposal, and the council’s reasons for coming to these beliefs;
• any reasonable alternatives to the closure of Inveravon Primary School; and
• the likely effect on the local community and different travelling arrangements
with the proposal to close a rural school.   
8.6 In preparing their report, HMIs undertook the following activities: 
• attended both public consultation meetings held on 27 September 2022;
• considered all relevant documentation provided by Moray Council in relation
to the proposal, specifically the educational benefits statement and related
consultation documents, written and oral submissions form parents and
others; and,
• visited Inveravon Primary Schoo,l Knockando Primary School, Aberlour
Primary School and Glenlivet Primary School with the intent to view the
schools and discuss the proposal to close Inveravon Primary School with
relevant consultees. 
8.7 Education Scotland are of the view that there are sound reasons for Moray
Council to consider the long term viability of Inveravon Primary School.  HMIs
agree that the proposal by Moray Council will result in educational benefits for
children in the Inveravon Primary School catchment area. They state that the
proposal provides clarity for the parents and for staff in neighbouring schools
that children have attended since 2017 and addresses the future education
provision in the area.   
8.8 The report highlighted that children currently benefit from working with larger
peer groups aligned to their age and stage. 
8.9 The report concluded that the predicted school roll in the wider area makes it
unlikely that all four primary schools affected by this report could be sustained.   
8.10 Education Scotland noted that parents/carers are fairly evenly split between
Option 1, all of the catchment area allocated to Knockando Primary School and
Option 3 where it is split across the three neighbouring primary schools.  
8.11 Education Scotland recognise that the mothballing and proposed closure of
Inveravon Primary School is a loss to the community. They highlighted the
importance of  Moray Council working with Ballindalloch Estate, who land
ownership will revert to in event of school closure, and the local community to
explore options for both the school building and land, should the proposal be
approved.   
8.12 The Council welcomes the Education Scotland report and accepts its findings.
In response to the findings within the report, Moray Councils response is as
follows: 
Page 156

Page 157

• The Council has acknowledged the community concern about the future
of the land and school building. Should the proposal go ahead the
importance of Moray Council, Ballindalloch Estate and community
groups and organisations to work together to find an appropriate use for
the site and buildings is recognised. 
• The Council accept that there is a view that the mothballing process was
poorly handled. Para 7.10 provides more detail around the rapidly
changing situation leading up to the school not opening in August 2017
and subsequently mothballing in September 2017 which we believe
mitigates this view. In order to avoid any future confusion in terms of
actions and communications around any future mothballing Moray
Council have recently implemented a more robust process. 
9 Alleged Omissions or Inaccuracies and Additional Information 
9.1 Section (10)(3) of the 2010 Act also places a requirement on the Council to
provide details of any inaccuracies or omission within the proposal document
which has either been raised by the consultees or identified by the Council itself.   
9.2 This section of the 2010 Act also requires the Council to provide a statement on
the action taken in respect of the inaccuracy or omission, or, if no action was
taken, to state that fact and why. 
9.3 Officers are required to publish its response to representations made during the
consultation period within its final Consultation Report.   
9.4 There were no areas identified by consultees as being inaccurate or omitted
from the proposal document during the consultation period. 
10 Compliance with Section 9(1) of the Schools (Consultation) (Scotland)
Act 2010 
10.1 Section 9(1) of the Schools (Consultation) (Scotland) Act 2010 states that: 
After the Education Authority has received HMIE’s report, the Authority is
to review the relevant proposal having regard (in particular) to    
(i) written representations received by the Authority (from any person)
during the consultation period, 
(ii) oral representations made to it (by any person) at the public meeting, 
(iii) HMIs report 
10.2 The feedback from the consultation, and all the questions and comments raised,
were considered in detail by officers. Data and factual information was checked
where required and advice and input was sought from other Council Services
where needed to consider the issues raised. This ensured that the Council met
the requirements to review the proposal under section 9(1) of the 2010 Act. 
Page 157

Page 158

10.3 Officers of the Education Service and Education Resources and Community
Service have listened to the points made at the public meeting and have
considered equally carefully the written representations received.   
10.4 The Education Service’s position (as the Education Authority) is set out in
Section 4 of this report. 
10.5 The educational benefits were reviewed in respect of the Education Scotland
report and representations made. Factors included in the Education Scotland
report or representations made regarding any aspect of the educational benefits
were considered. 
10.6 There were no aspects included in the representations made which provided a
different conclusion in relation to the rural school factors. 
11 Compliance with Sections 11A to 13 of the Schools (Consultation)
(Scotland) Act 2010 
11.1 Inveravon Primary School is a remote rural school, therefore the Schools
(Consultation) (Scotland) Act 2010 requires the Authority to have special regard
to the following factors: 
(a) the likely effect on the local community in consequence of the proposal, 
(b) the likely effect caused by any different travelling arrangements that may
be required in consequence of the proposal. 
11.2 As Inveravon Primary School is a rural school, special regard was paid to the
rural school factors.   
Likely Effect on the local community 
11.3 Inveravon Primary School has not operated as a school since August 2017. 
The Council recognises that Inveravon Primary School was a sustainable
learning community prior to the school roll falling to zero at the start of the
2017/18 session.  It is also acknowledged that the uncertainty surrounding the
future opening of the school has impacted on the community and it is hoped
that this statutory consultation will give clarity to the community and a sense of
certainty regarding the future of their children’s education.    
11.4 During the engagement and consultation process surrounding the future of
Inveravon Primary School full endeavours have been made to ensure all
residents within the catchment area have been communicated and consulted
with to ensure that the impact on the community is understood by officers. 
11.5 Prior to launching the statutory element of the consultation, opportunities were
made available to all members of the community to either suggest ways to make
the school viable again or alternative uses for the building that would benefit the
community. 
Page 158

Page 159

11.6 There were no suggestions from the engagement and consultation that could
be seen as ways of ensuring a viable future school.   
11.7 The alternative uses proposed during engagement and consultation will be
shared with the Ballindalloch Estate, to whom the land ownership, and by
inference the building, will transfer in the event of the school closure, for them
to consider as future community use options. 
Likely effect caused by different travel arrangements  
11.6 Since 2017 free transport has been provided to those children in the Inveravon
Primary School catchment who attend Knockando Primary School. During this
same timeframe no transport has been provided to those children in the
catchment who attend Aberlour Primary School. 
11.7 The rezoning proposals in both Option 2 and 3 to this closure proposal see free
transportation now available to both Aberlour and Glenlivet primary schools
within their respective extended catchments. This will immediately benefit
children in and around the Marypark area who attend Aberlour Primary School.   
12 Representations to Scottish Ministers in terms of Section 15 of the Schools
(Consultation) (Scotland) Act 2010 
12.1 If the Authority makes a final decision to implement the proposal, it will require
to notify Scottish Ministers of that decision and provide them with a copy of the
proposal document and consultation report.  This must be done within six
working days of the decision.  Scottish Ministers have an eight-week period from
the date of the final decision to decide if they will call-in the proposal. 
12.2 Within the first three weeks of that eight-week period, Scottish Ministers will take
account of any relevant representations made to them.  Until the outcome of the
eight-week call-in process is known, the Authority cannot proceed to implement
the proposal. 
12.3 If Scottish Ministers call-in the proposal, they must refer the proposal to the
Convener of the School Closure Review Panels who may refuse to consent to
the proposal or grant their consent to the proposal subject to conditions or
unconditionally. 
12.4 It should be noted that the legislations allows for any person to make
representations to Scottish Ministers within three weeks of the Council taking
their final decision to implement a closure proposal. Moray Council expect the
decision on whether or not to implement this closure proposal at its meeting on
24 May 2023. If the decision is taken to implement the closure proposal, any
representations to Scottish Ministers, therefore, in this context need to be with
the Ministers within three weeks of this date. Therefore, any representations
must be made to Scottish Ministers by 14 June 2023. 
12.5 Anyone wishing to make representation to Scottish Ministers during the three
week period referred to above should do so by email to
schoolclosure@gov.scot or in writing to: 
Page 159

Page 160

The Scottish Government 
School Infrastructure Unit 
2A (South) Victoria Quay
Edinburgh EH6 6QQ. 
13.  Conclusion 
13.1  In review of the oral and written submissions to the formal consultation and
survey results, it is clear that there is stakeholder support for the proposal to
close Inveravon Primary School.  
13.2  Officers have carefully considered the opportunities, issues and challenges
identified by stakeholders during both the informal engagement and formal
consultation processes. 
13.3  The Council now has the following options: 
• Adopt the proposal to close the school; or 
• Amend the proposal in a minor way; or
• Amend the proposal significantly and undertake a further consultation
exercise on a new proposal; or 
• Withdraw the proposal and maintain the status quo. 
Each option is discussed below. 
Adopt the Proposal 
13.4 If the Council chooses to adopt the proposal and close Inveravon Primary
School on a permanent basis then one of the three options for Inveravon
Primary School, outlined in the proposal document, would need to be chosen. 
13.5 The most popular option amongst participants was Option 3, to close Inveravon 
School and split the current catchment between Knockando (the majority area),
Aberlour and Glenlivet.  This option was supported by 14 (51%) of the 27
participants who responded to this question of the online survey. The option
was discounted by 9 (33%) of the 27 participants who responded to the question
in the online survey.  The Council position is that this Option would most align
with the current parental choices to send their children to either Aberlour or
Knockando primary schools.        
13.6 If the Council adopts the proposal, it would be on the basis that it aligns with the
wishes of the majority of current parents/carers in the Inveravon Primary School
catchment AND that the educational benefits set out in the proposal document
would materialise and a period of uncertainty for the community would come to
an end.  Children will have access to greater learning opportunities and
experiences and increased socialisation through being part of a larger school. 
Opportunities to participate in peer support, classroom learning, learning groups
across stages and between classes and opportunities to engage in lunchtime,
after school and team events will be increased.  The primary schools of
Page 160

Page 161

Knockando, Aberlour and Glenlivet have the capacity to accommodate
additional children. The proposal will assist the Council to deliver ‘Best Value’
through making more efficient and effective use of its resources. 
Amend the proposal in a minor way and adopt 
13.7 During the consultation period no suggestions were received from stakeholders
that would require a minor amendment to the proposal. 
Amend the proposal significantly and undertake a further consultation exercise
on a new proposal 
13.8 The Schools (Consultation) (Scotland) Act 2010 requires that changes to the
school estate are subject to rigorous statutory consultation.  Any significant
amendments to the proposal would require a full consultation with pupils,
parent/carers and the wider community of all affected by the proposed schools. 
13.9 Allowing for appropriate governance the process can take in the region of nine
months to complete.   
13.10 This is considered to be unreasonable to go through another lengthy statutory
process.  The uncertainly surrounding the future of the school has significantly
impacted on the community and it is hoped that this statutory consultation to
close Inveravon Primary School will give clarity to the community and a sense
of certainty regarding their children’s education. 
13.11 Having reviewed the Education Scotland report and feedback from consultees,
officers concluded that the basis of the original proposal continues to be the
most appropriate conclusion for Inveravon Primary School. 
Withdraw the proposal and maintain the status quo 
13.12 This option would be to continue to mothball Inveravon Primary.  Maintaining
the status quo would continue the uncertainty for the community.  The school
would remain mothballed and the building would continue to draw on Council
revenue finances and require additional significant capital investment in the
future to be upgraded to Condition B status.   
13.13 Withdrawing the proposal, the Council would be failing to recognise or respond
to the educational and social benefits for Inveravon catchment children. 
Education Scotland has recognised the proposal has the potential to deliver
overall educational benefits for the children within the Inveravon catchment
area.  Children are currently benefitting from working with larger peer groups
closely aligned to their age and stage. 
14.  Recommendation(s) 
14.1  The recommendation of officers is that the Council should adopt the
proposal to permanently close Inveravon Primary School and re-assign
Page 161

Page 162

its catchment area between Knockando, Aberlour and Glenlivet primary
schools.  Children would also continue to receive school transport to
their catchment school where eligible. 
Page 162

Page 163

1 
Appendix A 
Proposal Document 
Closure of Inveravon Primary School 
Consultation open 29th August 2022 to 7th October 2022  
Item 16*
Page 163

Page 164

2 
This document has been issued by Moray Council in accordance with the
Schools (Consultation) (Scotland) Act 2010 as amended. The Act requires that
changes to the school estate, including the proposed closure of a school, are subject
to rigorous statutory consultation. 
The schools affected by this proposal are: 
• Inveravon Primary School
• Knockando Primary School
• Aberlour Primary School
• Glenlivet Primary School 
DISTRIBUTION 
A copy of this document is available on the Moray Council website: 
http://www.moray.gov.uk/moray_standard/page_105407.html  or by emailing
learningestate@moray.gov.uk 
This document will be made available to:  
• Parent Councils of the schools listed above
• Parents of the pupils at the schools listed above
• Pupils at the schools listed above
• Parents of pre-school age children living within the Inveravon catchment
• Staff at the schools listed above
• Trade union representatives of the above staff
• Speyside Community Council
• Inveravon Community Association
• Knockando Community Association
• Glenlivet and Tomintoul Development Trust
• Education Scotland
MORAY COUNCIL IS PROPOSING, SUBJECT TO THE OUTCOME OF THE
STATUTORY CONSULTATION PROCESS:
• To discontinue education at Inveravon Primary School, which is
currently mothballed and re-assign its catchment area to that of
Knockando and Glenlivet
• The proposal would apply to the primary school stages (P1-P7) of
education in Inveravon, as there is no pre-school education provided
at the school.
• The proposed changes, if approved, will take place immediately
after the conclusion of the statutory process relating to school
closures.
Page 164

Page 165

3 
• Inveravon catchment residents 
Read copies of this document is also available at: 
• Aberlour Library
• Knockando Primary School
• Aberlour Primary School
• Glenlivet Primary School
• Glenlivet Medical Practice
• Ballindalloch Post Office
• Community Centre, Speyside High School
• Elgin Central Library 
Page 165

Page 166

4 
1. Legislative Background 
1.1. The proposal is advanced within the context of all applicable legislation. 
Amongst other duties, education authorities are required to secure adequate
and efficient provision of school education (S.1 of the Education Act 1980); and
to endeavour to secure improvement in the quality of school education in
schools that are managed by them (S.3 of the Standards in Scotland’s Schools
Act 2000).   
1.2. Inveravon Primary School is classed as remote rural school within the terms
of the Schools (Consultation) (Scotland) Act 2010 and the Council has had
regard to the provisions of that Act, in particular the heightened consideration
to be given to rural school closures. In terms of that Act, S7 requires a public
meeting to be held as part of the consultation process. 
2. Introduction 
2.1. Moray Council strives to allocate its resources in a way that ensures the
quality of all of its services. It attaches particular importance to providing the
best possible educational experience for all of the pupils in its schools. 
2.2. This proposal document is focussed upon Inveravon Primary School, located
within Speyside area of Moray, and part of the Speyside Associated School
Group. 
2.3. This proposal document contains several maps. PDF copies of all maps will
be available on the Moray Council website at the address given on page 34 of
this document. Printed copies of the maps will also be available on request in
each of the schools affected by the consultation and at Aberlour Library. 
The consultation will run from Monday 29 August 2022 until Friday 7 October.
Two public meetings will be held on Tuesday 27 September 2022 at Speyside
High School between 7pm and 8pm and Inveravon Church between 1.30pm
and 2.30pm. An online meeting will be held on Wednesday 28 September
2022 between 7pm and 8pm. 
2.4. The consultation process for this proposal is set out in detail in Section 17 of
this document. 
3. Reason for Proposal 
3.1. This proposal is being advanced for the following reasons: 
• No children have attended Inveravon Primary School since the end of
session 2016/17, when the school was mothballed. The decision to mothball
was taken as no pupils were enrolled from Aug 17. 
Page 166

Page 167

5 
• No parents have chosen to enrol their children at Inveravon Primary
School for the 2017/18, 2018/19, 2019/20, 2020/21, 2021/22 or 2022/23
sessions. 
• Although the number of primary school children in the Inveravon
Primary School catchment totals 15 for the 2022/23 session those families
who have formally indicated their choice (9 in total) do not wish to send their
children to Inveravon Primary School as they have settled elsewhere.   
• A school roll of fewer than 15 pupils provides significant impediments
to the successful implementation of a Curriculum for Excellence. 
• A school roll of fewer than 15 pupils hampers social interaction
opportunities for children, who conversely benefit from attending larger
schools amongst more children of their own age. 
• The Council has explored alternatives in arriving at this proposal,
explained further below. 
• Alternative uses of the school building are restricted as the land is
owned by the Ballindalloch Estate and was gifted to Moray Council more than
a hundred years ago. The ‘deeds’ state that in the event of the site not being
used for the education of children the land shall be returned to the Estate 
3.2. The current proposal follows informal discussions between Moray Council
officials; local elected members, the community council and community
members. Informal meetings with the community were held as follows: 
• Community engagement session (virtual) - Wednesday 9 February
2022
• Community engagement session (virtual) - Tuesday 8 March 2022
• Community engagement session at Speyside High School – Tuesday 8
March 2022 
3.3. Letters were sent to every property within the catchment area to inform
residents of the meetings in February 2022, with other contact details if they
were unable to attend. 
3.4. In addition to the engagement session’s comments boxes were made
available in locations around the Inveravon catchment as well as in Glenlivet,
Knockando and Aberlour, and an online comments page was open on the
Moray Council website from 16 February 2022 to gather views from all
residents and people could telephone or email the Learning Estate team. 
3.5. Despite a small uptake in numbers, these sessions proved useful and a
number of suggestions were made over the course of the sessions for use of
the school building – albeit with the understanding that should the school
close these would need to be pursued with the Ballindalloch Estate. 
Page 167

Page 168

6 
4. Examination of Alternatives 
4.1. In bringing forward this proposal for closure, the Council must have special
regard to any viable alternatives to closure. The alternatives to closure would
be: 
• to re-open Inveravon Primary School with its current catchment area or; 
• to continue with the current “mothballing” arrangement. 
4.2. During the community engagement sessions, officers sought suggestions of
alternatives to closure, although it was made clear that where the suggestion
was not education related Moray Council could only note these and would
forward these onto the Ballindalloch Estate for consideration as the land (and
by inference the school building) would be returned to them in the event of a
closure decision. The suggestions included: 
• Community space for activities
• Outdoor activity centre  
• Community cafe
• Rural business centre
• Residential property 
4.3. As none of them involve the building operating as a primary school for local
pupils, they would not be a viable alternative to closure. 
4.4. In the event of a school closure being approved, consideration is required of
the most appropriate way to re-zone the school catchment area. Further
discussion of this is included in Section 7 of this report. 
4.5. The detail of the Council’s consideration of the alternatives is set out
throughout this proposal paper and the Options Appraisal. 
5. Inveravon Primary School 
5.1. During the build up to the closing months of the 2017/18 session it was noted
that a number of children on the school roll were electing to move to
Knockando and Aberlour primary schools. 
5.2. In August 2017, due to no children attending the school from the start of the
new 2017/18 session, the Education Service was left with no alternative but to
take the decision to mothball Inveravon.   
5.3.  The Speyside Associated School group consists of 8 primary schools,
Aberlour, Craigellachie, Glenlivet, Inveravon, Knockando, Mortlach, Rothes
and Tomintoul. Each of these schools is in the catchment for Speyside High
School in Aberlour. 
Page 168

Page 169

7 
5.4. Inveravon Primary School was built in the early 20th century. The school is
non-denominational and serves properties within the rural area of the
Ballindalloch Estate. It is located by the A95 just north of the Bridge of
Inveravon 6.5 miles from Aberlour. 
5.5. Inveravon Primary School catchment is bordered by Aberlour, Glenlivet,
Knockando and Tomintoul schools within the Moray Learning Estate. It is also
bordered to the west by Grantown Primary School in the Highlands Council
area. Map 1 below shows the catchment area for Inveravon Primary School
and the neighbouring schools. 
Page 169

Page 170

8 
Map 1 – Catchment area for Inveravon Primary School and surrounding schools 
5.6. As mentioned in 1.2 under the Scottish Government Guidelines Inveravon
primary school is classed as a remote rural school – that is it serves a
population of less than 3,000 and is more than 30 minutes’ drive from a
settlement of 10,000 or more. 
5.7. Inveravon Primary School has a functional capacity of 50 pupils. It is a single
storey building with two classrooms, kitchen, hall, resources room, library
reception/staff room.  The hall doubles as both a dining room and indoor PE
area. The school has a servery kitchen which served meals that were
prepared at Aberlour Primary and delivered to Inveravon Primary School on a
daily basis. The outside areas consists of a small concrete play area on the
north aspect of the building which extends to adjacent grassed area. 
5.8. Inveravon Primary School delivered primary education from P1-P7. There is
no nursery on site and local children often attended Knockando or Aberlour
nursery. The school did not operate a breakfast club or after school club
outwith school hours. 
5.9. When the school was last in operation, it was managed with a paired head
teacher arrangement with Knockando Primary School. If the school were to
re-open with one class, the staffing entitlements (Full Time Equivalent (FTE))
could be as follows: 
• Head Teacher - 0.5 FTE
• Principal Teacher - 1 FTE
• McCrone support - 0.12 FTE
• Pupil Support Assistant - 25 hours
• Senior Catering Assistant -10 hours
• Playground assistance - 7 hours
• Lunchtime supervisor – 7.5hours   
This would be dependent upon actual school roll and in line with the Moray
Devolved School Management Scheme staffing formula. 
5.10. In addition, any ASN teaching and pupil support staff would be allocated to the
school in accordance with an annual assessment of need across the Speyside
Associated Schools Group. 
5.11. Every local authority in Scotland is required to grade their schools for
condition and suitability. The grades range from A to D for each category with
the following values: 
• A: Good - Performing well and operating efficiently (the school buildings
and grounds support the delivery of services to children and communities)
Page 170

Page 171

9 
• B: Satisfactory - Performing adequately but with minor problems (the
school buildings and grounds support the delivery of services to children
and communities);
• C: Poor - Showing major problems and/or not operating adequately (the
school buildings require continuous repair and does show signs of age/the
school buildings and grounds impede the delivery of activities that are
needed for children and communities in the school)
• D: Bad – Economic life expired and/or risk of Failure (the school buildings
and grounds do not support the delivery of services to children and
communities). 
5.12. Inveravon Primary School was assessed as B for suitability and C for
condition prior to mothballing. A more recent condition survey in June 2022
has assessed the overall condition remains at C although a number of
elements are condition D. A breakdown of the condition elements is shown in
the table below.
Roofs
Floors and Stairs
Ceilings
Ext Walls, Windows and
Doors
Int Walls and Doors
Sanitary Services
Mechanical
Electrical 
Decoration
Fixed Int Fixtures,
Furniture and Fittings
External Areas
Outdoor Sports Facilities
Overall Score
Condition Category
C D C C B C D D C B D N/A 42.27% C
Table 1. Core Condition Assessment (Overall and Individual Elements) 
5.13. There is no current Education Scotland Inspection report available for
Inveravon Primary School. The last report HMIE Inspection Report was
January 2012. 
6. Details of Proposal 
6.1. The Council proposes that Inveravon Primary School should be closed on a
permanent basis. This would be with immediate effect from the completion of
the consultation process. The Council also proposes that all existing primary
aged pupils should continue their education at the schools they are currently
attending. If the proposals are implemented any siblings of these current
pupils would be able to join their brother/sister(s) at the same school. 
6.2. The school catchment area would be reassigned to one of the neighbouring
primary schools. Discussion of these options is set out in Section 7. 
• Option 1 - Close Inveravon Primary School and rezone to Knockando
Primary School.
Page 171

Page 172

10 
• Option 2 - Close Inveravon Primary School and split catchment between
Knockando and Aberlour Primary School.
• Option 3 - Close Inveravon Primary School and split catchment between
Knockando, Aberlour and Glenlivet primary schools. 
Discounted options and alternatives to closure: 
• Option 4 - Close Inveravon Primary School and rezone with Aberlour
Primary School.
• Option 5 - Close Inveravon Primary School and rezone with Glenlivet
Primary School.
• Alternative 1 - Re-open Inveravon Primary School.
• Alternative 2 - Continuation of mothballing Inveravon Primary School 
Details of the Council’s consideration of the alternatives is set out in Section 8
and the discounted options in Section 9. 
6.3. The options identified above would have a minor impact on the rolls of the
schools affected. Table 1 below details the current roll and capacity of these
schools over the next five years as per the Moray Council School Roll
Forecast, using the census taken in September 2021. 
School Suitability
Rating
Condition
Rating
Functional
Capacity
Current
Roll 
(Sep 21)
2022/
2023
2023/
2024
2024/
2025
2025/
2026
Inveravon B C 50     
Knockando B C 75 46 47 51 57 56
Aberlour B B 183 116 111 111 117 119
Glenlivet B C 42 20 19 18 18 18
Table 2. School Roll Forecast 
6.4. Birth rate data included in previous school roll forecasts, indicate that within
the Inveravon catchment area there are around seven that would be expected
to attend Inveravon School within the next three years. These pupils could be
accommodated at either Knockando, Aberlour or Glenlivet primary schools. 
6.5. Alternative uses for the building will be further explored with the community
during the consultation period and beyond. Although in the event of closure
the land and school building will be ‘returned’ to the Ballindalloch Estate,
officers will seek to support individuals and community groups in ensuring any
potential alternative uses suggested are forwarded to the Ballindalloch Estate
for consideration. 
6.6. It is important that this proposal does not have a negative impact upon any
children currently attending schools affected by this proposal and that they
have continuity in their education. 
7. Options Assessment 
7.1. Officers applied an objective methodology to the assessment of the options
which are discussed in Appendix A. 
Page 172

Page 173

11 
7.2. Together with each school’s baseline score and outcome of the options
appraisal matrix, other aspects that were taken into account for the overall
recommendations were: 
• Transport
• Outcome of surveys representing the views of the Inveravon School
catchment parents and wider Inveravon community
• Views of parents and public expressed during engagement sessions
• Financial qualitative information
• Viability and timescale for option to be completed 
7.3. Table 3 below shows the Options final rankings. Option 1, close Inveravon
Primary School has the highest ranking although Option 2 and 3 also score
highly and warrant consideration during the statutory consultation. 
Options Final
Ranking
Option 1 - Close Inveravon Primary School and rezone to
Knockando Primary School. 
1
Option 2 - Close Inveravon Primary School and split
catchment between Knockando and Aberlour Primary
School.
2
Option 3 - Close Inveravon Primary School and split
catchment between Knockando, Aberlour and Glenlivet
primary schools. 
3
Table 3 – Outcome of options appraisal 
7.4. Option 1 - Close Inveravon Primary School and rezone to Knockando
Primary School 
7.4.1 The proposed catchment for this area for this option is shown below in Map 2. 
7.4.2 Knockando Primary School is a multi-building school. The main school
building was built in the early 1900’s with additional two buildings, a gym hall
built in and a dining room and additional classroom constructed in 1960s. It is
situated in the rural area of Knockando, 9.8 miles west of Aberlour and some
6.6 miles from Inveravon Primary School by road. During the period of
mothballing Knockando Primary School has been the designated schools for
pupils in the Inveravon catchment area and has a shared head teacher with
Inveravon Primary School. The school is non-denominational and is classed
as “remote rural” school according to Scottish Government classification. 
7.4.3 The school offers both primary education from P1-P7 and a partner operated
nursery on site.  Accommodation consists of three classrooms for school age
children and one for nursery, a games hall used for PE and a dining block with
both dining room and classroom area. The main building has multiple general-
purpose rooms, library, Head Teacher office, school office and staff room. The
Page 173

Page 174

12 
school has a servery which is designed to provide meals prepared at Rothes
Primary School and delivered to the school on a daily basis. The outside
areas are a concrete area with a small tarmac playground and grassed
playing field area. 
7.4.4 Knockando Primary School has a functional capacity of 75 pupils and a
current roll of 46 P1-P7 pupils (September 2021). These are distributed
across 3 classes. The school roll forecast suggests pupil numbers will see a
small increase to a max of 58 in 2026. This represents a 58% use of capacity. 
Page 174

Page 175

13 
Map 2 – Proposed catchment area with rezoning Inveravon to Knockando Primary
School 
7.4.5 The class structure for the 2021/22 session is shown in Table 4 below 
Stage Class structure
P1/2 9/8
P3/4/5 5/7/4
P6/7 7/6 
Table 4 – Knockando Primary School Class Structure on Census Day 
7.4.6 On census day, there were 14 children from out of zone (including pupils from
Inveravon) who were attending Knockando Primary and 6 children who were
zoned for Knockando who were attending elsewhere. 
7.4.7 Knockando Primary School is currently assessed as B (81.9%) for Suitability
(satisfactory – performing well but with minor problems) and C for Condition
(satisfactory – performing adequately but showing minor deterioration). 
7.4.8 There are pupils from the Inveravon catchment area currently attending
Knockando School who are transported to school within current transport
contracts. With the permanent closure of Inveravon Primary School this
number would remain unchanged. 
7.5. Option 2 - Close Inveravon Primary School and split catchment between
Knockando and Aberlour Primary School 
7.5.1. The proposed catchment for this area for this option is shown below in Map 3
Page 175

Page 176

14 
Map 3 – Proposed catchment area with rezoning Inveravon to Knockando and Aberlour
primary schools 
7.5.2. Information on Knockando Primary School remains as per Section 7.4 
7.5.3. The main Aberlour Primary School building was built in 1897. It is situated in
the centre of Aberlour to the south of the A95, 15 miles south of Elgin and is
6.6 miles from Inveravon Primary School by road. During mothballing a small
number of pupils from the Inveravon catchment have been on the Aberlour
Primary School roll. The school is non-denominational and is classed as
“accessible rural” school according to Scottish Government classification.
Page 176

Page 177

15 
7.5.4. The school offers both primary education from P1-P7 and both a council and
partner operated nursery.  Accommodation consists of eight classrooms for
school aged children, a shared dining room/PE hall, multiple general-purpose
rooms, a library, Head Teacher office, school office, staff room and kitchen.
Aberlour Primary School also hosts the Primary Enhanced Provision base for
children with Additional Support Needs for the Speyside Associated Schools
Group. The outside areas are a concrete area with a tarmac playground and
small grassed play area with access to larger grass playing field across a
residential access road. 
7.5.5. Aberlour Primary School has a functional capacity of 183 pupils and a current
roll of 116 P1-P7 pupils (September 2021). These are distributed across 6
classes. The school roll forecast suggests pupil numbers will remain steady
over the next five years – with a max of 120 in 2027 before falling to 114. This
represents a 58% use of capacity. 
7.5.6. The class structure for the 2021/22 session is shown in Table 5 below 
Stage Class structure
P1 19
P2/3 12/7
P3/4/5 9/7/4
P4/5 7/11
P6 18
P7 22 
Table 5 – Aberlour Primary School Class Structure 
7.5.7. On census day, there were 31 children from out of zone who were attending
Aberlour Primary and 3 children who were zoned for Aberlour who were
attending elsewhere. 
7.5.8. Aberlour Primary School is currently assessed as A (88.9%) for Suitability
(satisfactory – performing well but with minor problems) and C for Condition
(satisfactory – performing adequately but showing minor deterioration). 
7.5.9. There are a small number of pupils from the Inveravon catchment area who
currently attend Aberlour Primary School who do not have an entitlement to
council provided school transport. With this option the permanent closure of
Inveravon Primary School would likely see a small increase in the number of
children entitled to council provided school transport to Aberlour Primary. 
7.6. Option 3 - Close Inveravon Primary School and split catchment between
Knockando, Aberlour and Glenlivet primary schools 
7.6.1 The proposed catchment for this area for this option is shown below in Map 4 
7.6.2 Information on Knockando and Aberlour primary schools remains as per
Sections 7.4 and 7.5.
Page 177

Page 178

16 
7.6.3 The main Glenlivet Primary School building was built in 1900. It is situated in
the rural community of Glenlivet to the south of the A95, 12 miles south-west
of Aberlour and is 5.6 miles from Inveravon Primary School by road. The
school is non-denominational and is classed as “remote rural” school
according to Scottish Government classification. 
7.6.4 The school offers primary education from P1-P7.  Accommodation consists of
two classrooms for school age children, a shared dining room/PE hall, a
library and office/staff room. The school has a servery which is designed to
provide meals prepared at Aberlour Primary School and delivered to the
school on a daily basis. The outside areas are a mix of small tarmac and
grass play areas. 
7.6.5 Glenlivet Primary has a functional capacity of 47 pupils and a current roll of 20
P1-P7 pupils (September 2021). These are distributed across 2 classes. The
school roll forecast suggests pupil numbers will remain steady over the next
five years – with a max of 21 in 2027. This represents a 44% use of capacity. 
Page 178

Page 179

17 
Map 4 – Proposed catchment area with rezoning Inveravon to Knockando, Aberlour
and Glenlivet primary schools 
7.6.3 The class structure for the 2021/22 session is shown in Table 4 below 
Stage Class structure
P1-4 4/1/2/3
P5-7 3/4/4 
Table 6 – Glenlivet Primary School Class Structure 
Page 179

Page 180

18 
7.6.4. On census day, there were 0 children from out of zone who were attending
Glenlivet Primary and 4 children who were zoned for Glenlivet who were
attending elsewhere. 
7.6.5. Glenlivet Primary School is currently assessed as B (81.6%) for Suitability
(satisfactory – performing well but with minor problems) and C for Condition
(satisfactory – performing adequately but showing minor deterioration). 
7.6.6 There are a number of pupils from the Inveravon catchment area currently
attending Glenlivet Primary School. With this option the permanent closure of
Inveravon Primary School would see a small increase in the number of
children entitled to council provided school transport to either Knockando,
Aberlouror Glenlivet. 
8. Alternatives to the Proposal 
8.1. In bringing forward this proposal for closure, the Council must have special
regard to any viable alternatives to closure. 
8.2. The detail of the Council’s consideration of the alternatives is set out below. 
8.3. Re-open Inveravon Primary School with Current Catchment Area 
8.3.1 There are currently 15 children of P1-7 age living within the catchment area of
Inveravon School (SEEMIS extract December 2021). These children all attend
other schools in the area, having submitted successful out of zone placing
requests to attend other schools. 
8.3.2 There are only 12 new houses either allocated within the local development
plan or with approved planning permission within the Inveravon School
catchment area. The site is constrained and no development has yet taken
place, therefore it cannot be guaranteed that new housing will generate any
primary aged pupils in the near future. 
8.3.3 If the school were to re-open, the pupils that reside within Inveravon, who
enrol at the school, would have a slightly shorter journey time than they do at
present. 
8.3.4 Reopening of the school would require full remediation of the site, and
significant capital works to the building to achieve overall Condition B status.
The cost of this has been estimated to be over £206k to support reopening
and a further investment of over £130k over the next 5 years. This capital sum
is not within the current capital plan and would need to be approved as an
additional spend by elected members if Inveravon Primary School were to be
reinstated.  
Page 180

Page 181

19 
8.4 Continuation of “Mothballing” Inveravon Primary School 
8.4.1 Although it would be possible to continue with the current mothballing
arrangement, Moray Council does not consider that would represent the best
option for the community or taxpayer. Mothballing would mean the
continuation of the current lack of clarity regarding the future status of the
school. The Council would also be responsible for the costs of maintaining a
mothballed building. 
8.4.2 Scottish Government guidance relating to the mothballing of schools makes it
clear that mothballing is a temporary measure and should not be used to
undermine the requirements to undertake a statutory school closure
consultation. Inveravon Primary School will have been mothballed for 5 years
at the time this report is submitted. 
8.4.3 As previously stated Inveravon School has not been operational since August
2017. During this period pupils have been either attending Knockando or
Aberlour Primary Schools. This has been a significant period of uncertainly for
families, a continuation of mothballing does not provide clarity to the situation. 
9 Discounted Options 
9.1 The detail of the Council’s consideration of the discounted options is set out
below: 
9.1.1 Option 4 - Close Inveravon Primary School and rezone with Aberlour Primary
School. Although some children within the current Inveravon catchment do
attend Aberlour Primary, and this would remain a parental choice in the future
no matter the outcome of the statutory process, the majority of current parents
have elected to send their children to Knockando. The reasons for this relate
to a smaller school and less distance to travel for the majority of children.
There was no parental support for this full rezoning option.   
9.1.2 Option 5 - Close Inveravon Primary School and rezone with Glenlivet Primary
School. Due to the topographical area – especially the location of school in
relation to the rivers Spey, Avon and Livet and their respective road crossing
this creates excess travel distances between much of the Inveravon
catchment and Glenlivet Primary School. These roads are also predominantly
rural B roads which experience disruption during the winter months. There
was no parental support for this full rezoning option. 
10. Education Benefits Statement 
10.1. In 2009, the Scottish Government set out its Vision for the Future School
Estate in Scotland, in ‘Building Better Schools:  Investing in Scotland’s
Future’.     
10.2. In September 2019, this was updated with Scotland’s Learning Estate
Strategy ‘Connecting People, Places and Learning’ which was developed by
Page 181

Page 182

20 
Scottish Government and COSLA.  This contains ten guiding principles.  Local
Authorities are required to take account of these principles in planning
changes to their school estate, namely: 
• Learning environments should support and facilitate excellent joined up
learning and teaching to meet the needs of all learners; 
• Learning environments should support the wellbeing of all learners,
meet varying needs to support inclusion and support transition for all
learners;  
• The learning estate should be well-managed and maintained, making
the best of existing resources, maximising occupancy and representing
and delivering best value; 
• The condition and suitability of learning environments should support
and enhance their function; 
• Learning environments should serve the wider community and where
appropriate be integrated with the delivery of other public services in
line with the place principle; 
• Learning environments should be greener, more sustainable, allow
safe and accessible routes for walking, cycling and wheeling and be
digitally enabled; 
• Outdoor learning and the use of outdoor learning environments should
be maximised; 
• Good consultation about learning environments, direct engagement
with learners and communities about their needs and experiences, and
an involvement in decision making processes should lead to better
outcomes for all; 
• Collaboration across the learning estate, and collaboration with
partners in localities, should support maximising its full potential; 
• Investment in Scotland’s learning estate should contribute towards
improving learning outcomes and support sustainable and inclusive
economic growth. 
10.3. In May 2016, Moray Council approved the ‘Schools for the Future’:  A policy
for Sustainable Schools’ in order to monitor schools provision in Moray and
ensure provision continues to meet the needs of learners, parents and the
community and enable the Council to meet its requirements to ensure best
value, as per the Local Government Scotland Act 2003.  This policy
contributes to the aim of ensuring all children and young people in Moray have
equality of opportunity in terms of access to educational provision and
facilities.  
Page 182

Page 183

21 
10.4. Within this policy, Moray Council set criteria and indicators in determining
optimum quality education experience which include provision of
accommodation as reported to Children and Young People’s Services
Committee for: 
• The range of curricular and wider school activities available for children to
enable them to achieve in a range of activities for personal and wider
achievement (e.g. physical education, music, art, drama) ; 
• The ability of the school to cater for children with Additional Support
Needs; 
• The school’s ability to provide access to a suitably broad and balanced
curriculum; 
• The quality of the physical environment for learning and teaching   
o Condition - minimum standard B   
o Suitability – minimum standard B   
• No more than two composite year groups in a single classroom at primary
school level.   
• A minimum of four teachers at a primary school. This recognises both the
needs of pupils and the demands on teachers; and. 
• Ideally, at least seven classrooms (one for each year group). 
10.5. Key statutory requirements are further subsumed including delivery of 2 hours
minimum Physical Education as part of National standards, compliance with
statutory legislation in relation to school accommodation and Additional
Support Needs, UNCRC and the overall extent of on-site accommodation and
facilities (including required general purpose spaces, play and social spaces,
staff rest areas and outdoor spaces). 
10.6. Moray’s vision and strategic direction for all involved in Moray Education as
set out in our Education Strategic Plan and Priorities 2020-2023 – improving
outcomes for all Moray’s children and young people – is underpinned by the
core entitlements of Curriculum for Excellence in order to ensure all children
and young people maximise development in the four capacities:  Successful
Learners, Confident Individuals, Effective Contributors and Responsible
Citizens.  This stems from Early Learning and Childcare, across the Broad
General Education and through into the Senior Phase, working across our
system to ensure our learners progress to positive and sustained post-school
destinations.  Underpinned by our Council values of Fair, Ambitious,
Improving and Responsive we are ambitious to achieve excellence together in
benefit of all Moray’s children and young people.
Page 183

Page 184

22 
10.7. In order to deliver on our Education strategic vision and priorities, all Moray
schools thus work towards: 
• Improving outcomes for all:  help improve levels of children and young
people’s achievements and broaden the range of opportunities for young
people to develop their skills; 
• Curriculum:  provide a quality curriculum and create positive environments
for effective learning and teaching matched to the needs of learners; 
• Learning, teaching and assessment:  create the conditions for greater
personalisation and choice for children and young people with improved
continuity and progression in their learning; create more opportunities for
children and young people to participate in well-judged paired and group
activities; 
• Supporting all learners:  develop a supportive ethos where children and
young people’s learning, personal, social, health and emotional needs
address the care and welfare of children and young people and their
personal and social development.   
• Leadership at all levels:  strong, sustainable schools providing quality
education and access to the full curriculum are central to the achievement
of this vision and delivering these entitlements. 
10.8. As further educational context, Curriculum for Excellence guides us to achieve
transformation in education in Scotland by providing a coherent, more flexible
and enriched curriculum from 3 to 18 firmly focused on the needs of the child
and young person and designed to enable them to become successful
learners, confident individuals, responsible citizens and effective contributors.
All children and young people are entitled to experience:   
• a coherent curriculum from 3 to 18;   
• a broad general education, including well planned experiences and
outcomes across all the curriculum areas. This should include
understanding of the world and Scotland’s place in it and understanding of
the environment;   
• a senior phase which provides opportunities for study for qualifications and
other planned opportunities for developing the four capacities;   
• opportunities for developing skills for learning, skills for life and skills for
work;   
• opportunities to achieve to the highest levels they can through appropriate
personal support and challenge; and, 
Page 184

Page 185

23 
• opportunities to move into positive and sustained destinations beyond
school; 
10.9. Educational benefits are considered below for pupils in respect of options
previously outlined in this proposal document. 
10.10. In December 2020, Moray Council approved the approach to the Moray
Learning Estate Strategy, setting out the vision of providing a sustainable
education service aiming for excellence.  As well as improving condition and
suitability as noted in 10.4 above, among wider outcomes this strategy aims to
ensure our learning estate enriches the learner journey and supports
curricular delivery noting the quality of learning environment as having a direct
impact on learning and achievement of children and young people.   
10.11. Ensuring all young people develop in the four Curriculum for Excellence
capacities through the learner entitlements in 10.8 above would prove more
challenging if Inveravon Primary School were to reopen with a reduced
number of pupils across the Primary age range.  This will also place discrete
pressures on staff, for example in planning for a wide range of needs, year
groups and abilities, in developing the curriculum and managing educational
change.  As a result, multi-stage composite classes can prove challenging to
recruit teachers compared with larger schools where classes have single or
few stage composite arrangements. 
10.12. Pupils attending schools within the Speyside Associated Schools Group in
closest proximity to Inveravon Primary School; Aberlour, Glenlivet and
Knockando Primary Schools, regularly work in pairs and groups on shared
learning tasks and cooperative learning activities.  A school size low in pupil
numbers, for example in a school of 5 or fewer children, based on potential
future intake if Inveravon Primary School re-opened, would mean that groups
would be curtailed in size restricting activities to those of a paired nature, with
little to no flexibility in change or rotation of participants in pairings or
groupings.  Pupils could be spread multi-stage across P1 to P7, and while
benefitting cross-stage working, this may result in reduced peer challenge in
learning or potential for sibling pairing/groups.  The variety of skills, knowledge
and wider experiences brought to the groups would be further restricted by roll
size and may result in gender imbalances and inequity in provision of a full
programme of wider school activities. 
10.13. In comparison as the smallest school based on the three named closest to
Inveravon Primary School, Glenlivet Primary School operates within a pairing
under a shared Head Teacher, school roll projections over the next five years
remain near to 20 children on roll, with partnership approaches in place with
the paired school; Tomintoul Primary School.  This includes joined projects
and staff professional and collegiate development activities while both schools
retain their own unique identities.  Children have regular opportunities to self
and peer assess in each school as well as work in stage and cross stage
pairings and groups. 
Page 185

Page 186

24 
10.14. In Aberlour and Knockando Primary Schools, children have regular
opportunities to work in cooperative learning groups, on paired and in group
activities with five and three classes formed in each school respectively.  This
further supports discussions and debate with a range of viewpoints and
background of learners contributing to such activities.  Class organisation
within each school offers a blend of individual, group and class learning and
teaching over the session. 
10.15. The reopening of Inveravon would prove more restrictive for children to
develop skills for learning, life and work with fewer or no opportunities to work
with others of a similar age and stage, which is not possible in a school size
low in pupil numbers, for example in a school of 5 or fewer children based on
potential future intake.  Pupils may miss opportunities to develop wider skills
for life in particular with limited immersion and interaction with a wide range of
peers, where levels of attendance and participation may also impact further on
this. 
10.16. In Knockando, a skills framework has been developed following refresh of the
school’s Curriculum Rationale.  This promotes equity of opportunity,
supporting successes and achievement of all pupils within the formal and
informal curriculum.  Children use learning logs to reflect on skills
development.  In Glenlivet, curricular programmes that support sustained
development of skills for learning, life and work have been developed where
STEM (Science, Technology, Engineering and Maths), and the Career
Education Standards/Career Management Skills are specific within the
school’s skills development pathway and staff continually look for ways to
ensure children are challenged and motivated in learning.  As the largest
school in the Associated Schools Group, children at Aberlour Primary School
benefit from wider skills development and transferability through various
community projects and whole-school initiatives supported by partners
including Primary Engineer, Christmas Enterprise, DYW initiatives and Moray
Primary Science.  Aberlour Primary School’s Skills Progression “Skills for
Stars” lead to weekly OSCARS (Our School Can Achieve Results) which link
to profiling and the Moray Skills Pathway. 
10.17. Collaboration with wider staff in order to ensure a coherent and progressive
curriculum can prove more difficult in a school with low roll size.  As noted with
Glenlivet Primary School paired with Tomintoul Primary School, a progressive
curriculum differentiated to meet the needs of each child with a focus on
engaging and active learning experiences is in place with opportunities for
personalisation and choice across the four contexts for learning.  Rich
contexts for learning including the outdoor areas are embraced with child-led
developments.   
10.18. In Aberlour Primary School, the curriculum supports children to develop in the
four capacities with planned inter-disciplinary learning for the transfer of skills
and knowledge with a commitment to active learning and purposeful play.  At
Knockando Primary School, there is a focus on skills development and
building on prior learning through cohesive learner pathways making the best
use of the outdoors and local context.  Children are increasingly benefitting
Page 186

Page 187

25 
from a range of play contexts that are adult-led, adult-guided or child-
initiated.  Pupils are developing social skills for sharing, co-operation, turn-
taking, listening and organising through play.  At Glenlivet Primary School,
children have ‘independent learning time’ each day with child-led and adult-led
play.  A dedicated outdoor space supports development of a range of play and
skills-based activities. 
10.19. Strong partnerships across the Speyside Associated Schools Group exist with
previous joint working on moderation, numeracy, health and wellbeing policy
and wider curriculum development.  Each school values community and wider
partnerships for supporting the Developing the Young Workforce agenda and
ensuring children are prepared for the future world of work and
employability.  At Glenlivet Primary School, partnership working further
supports skills development and curriculum enrichment where involvement in
partnership projects enables pupils to build confidence and take increasing
responsibility for their own learning – for example, learning for sustainability,
science, expressive arts and literacy.  Key partnerships with Tomintoul and
Glenlivet Landscape, Crown Estates, Spey Fishery Board and Glenlivet
Wildlife group have supported this.   
10.20. In Knockando Primary School, a range of partners and local employers
including Tamdhu Distillery, Knockando Estate, Knockando Athletics Club and
the Shieling Project offer opportunities to learn and be active outdoors.  Pupils
at Aberlour Primary School have opportunities to engage with local employers
and parents as employees for future employability and pathway opportunities,
alongside working closely with partner agencies as the Enhanced Provision
school for the Associated Schools Group.  Schools in the Associated Schools
Group also collaborate, including a week’s residential stay at Abernethy
Outdoor Centre for wider outdoor pursuit experience, team building and
transition support.   
10.21. Larger schools provide greater opportunities for pupil leadership and
involvement in the ethos and wider life of the school as well as provision of a
wider range of clubs and extra-curricular activities.  At Aberlour Primary
School, P7 House Captains and P6 Vice-Captains are elected each year to
lead ‘houses’, pupil voice activities and inter-house challenges including
sporting events, and contribute to whole school change
initiatives.  Community groups include Eco-schools, Rights Respecting
Schools group (successful in achieving ‘Gold’ status), philanthropic and
community engagement activities.  Staff lead a range of clubs and activities
for all children including Bikeability, Running, Languages, Outdoor Learning,
Choir, Nurture, Craft, Netball, Gardening and Leadership. P7 Play Leaders
further develop their leadership skills through the ‘Playground Squad’, leading
play activities and supporting lunchtime interaction sessions for younger
pupils. 
10.22. Play leaders at Knockando Primary School have been working with Active
Schools to support play and lunchtime interactions and activities for younger
pupils.  This ensures that all pupils feel included at playtimes and lunchtimes
and for the P6 and P7 pupils involved, this is further developing skills of
Page 187

Page 188

26 
leadership, organisation and problem solving.  Other opportunities include
Pupil Council, Global Citizenship, Community groups and wider pupil projects
to enhance the school and local community.  Lunchtime clubs include Club
Doodle, Netball Club, Book Club and Gardening Club where pupils also
engage in dance/performance, athletics and wider Moray Badge participation. 
10.23. At Glenlivet Primary School, child-led developments have led to
enhancements to school grounds and a cross-pollination investigation led to
bee-keeping at the school.  Real-life scientific and environment studies
including Citizen Science research, the Big Wasp survey and RSPB Bird
Watch further promote curiosity among learners, where a range of Monday
clubs are also offered including Health club, STEM club and Rights
Respecting School club led by the pupils.  Through ‘Glenlivet Go Getters’
(Pupil Council) all children make a significant contribution to school leadership
of change and views are taken on board. Bronze ‘Rights Committed’
accreditation has been achieved at Glenlivet with the school currently working
towards Rights Respecting Schools’ Silver ‘Rights Aware’ accreditation. 
10.24. The range of interactions offered by all schools and the leadership and wider
skills development opportunities presented strengthen capacity to work with
others as part of a team, problem solve, make decisions and increase
confidence in learners.  As part of a peer group of a sufficient size, social
interaction will enable further development of skills for learning life and work
and build self-efficacy and esteem.  A school size low in pupil numbers, for
example in a school of 5 or fewer children based on potential future intake
severely restricts opportunities for team sports, meaningful pupil leadership
opportunities, clubs and other active recreational activities. 
10.25. Aberlour, Glenlivet and Knockando Primary Schools are established as
caring, nurturing and inclusive environments for learning.  Aberlour Primary
School as the largest Primary School in the Speyside Associated Schools
Group holds Gold Rights Respecting Schools status and through their positive
relationships policy, aim to ensure all in the learning community are committed
to the school vision – ‘we show respect and have fun so we can learn from
everyone’.  Pupil achievements are regularly celebrated and ‘OSCARS’ (Our
School Can Achieve Results) focused on the four CfE capacities in 10.8
above, are awarded to pupils in recognition of their positive contribution and
achievements in learning. 
10.26. Knockando Primary School is a caring and inclusive school, where staff work
hard to get to know pupils and families well, supporting individual needs.  A
relational and restorative approach is taken to positive relationship
management where the school is on the journey to Gold Rights Respecting
School status.  The school’s Positive Relationship Policy has been developed
and shared with the school community with focus on inclusion, safeguarding,
mental and emotional wellbeing and accessing supports.   
10.27. Glenlivet Primary School has a very caring, nurturing and inclusive ethos with
strong community identify due to unique school location.  Individual reflective
portfolios and learning logs support children to reflect on their learning against
Page 188

Page 189

27 
the four capacities and development of skills.  Regular reflection against the
school’s ‘Smarts’ is undertaken by children to understand aspects of their own
wellbeing.  Staff actively promote inclusion and equity for all children and due
to size of school and one large multi-composite class, pupils are grouped by
ability as opposed to stage, strengthening pace and challenge in learning.  In
collaboration with all children, Glenlivet Primary School has developed a new
Positive Relationships Policy reflecting the United Nations Convention on the
Rights of the Child (UNCRC). 
10.28. Aberlour Primary School has the Primary Enhanced Provision base for
children with Additional Support Needs for the Associated Schools
Group.  Most children attend for part of the time, also attending mainstream
classes.  ‘The Rainbow Room’ provides specialist support for identified young
people and support on group and one-to-one basis.  Multi-agency links are in
place with key partners including Health, Social Work and 3rd sector. 
10.29. At Knockando Primary School, class teachers support all children where
required with support assistant input for targeted need.  Currently the Head
Teacher in class contact time supports in provision of additional Support for
Learning Teacher time, ensuring all children are supported as part of Moray’s
approach to staged intervention.  In Glenlivet Primary School, effective
planning to meet the needs of all learners, with clear progression pathways
and universal/targeted interventions where necessary.  A Support for Learning
teacher works with identified pupils over two days per week with Pupil Support
Assistant time for targeted needs. 
10.30. All schools within Speyside Associated Schools Group benefit from their
location in an area of outstanding natural beauty with access to extensive
grounds and countryside.  As a town school, Aberlour Primary School is in
close proximity to Speyside High School as the local secondary school, with
access to a range of external areas including a playing field, outdoor garden
area and hard-standing playground/parking area.  The school currently
houses a local authority and partner nursery.  The school is within walking
distance of the secondary school’s swimming pool, community sport facilities
and multi-use games area.   
10.31. The catchment of Knockando Primary School enjoys large grounds with easy
access to woodland, fields, burns and wildlife supporting outdoor learning
contexts.   During snowy weather, the hill next to the school is used as a
sledge/ski run.  The school is well resourced with outdoor playing fields and
play areas and additional multi-use spaces.  With extensive outdoor areas or
within close proximity to wider facilities in the case of Aberlour Primary
School, opportunities for team sports and game-based activities can be
maximised with a number of pupils on the roll of all three schools enabling
such activities. A larger staffing complement and parent body further
increases the likelihood of interested adults leading a broader range of
activities. Glenlivet Primary School pupils regularly use the woods located
behind the school for outdoor learning.  A community playpark organised by
the Go Getters funded by Pupil Equity Funding and other community monies
(Paul’s Hill Windfarm and the Glenlivet and Inveravon Community
Page 189

Page 190

28 
Association) is used by children during school time and is available for
community use outwith school times. 
10.32. Aberlour, Glenlivet and Knockando Primary Schools are committed to the 1+2
languages agenda.  French is offered across all three schools with the
addition of German in P5-P7.  This provides the opportunity to work as a
whole class and in small groups or pairings in participatory learning activities. 
Emphasis is on the spoken word and opportunities are planned through
enjoyable activities such as group and class games, role-play and songs. 
Delivery of language learning would be restricted within the multi-stage
context of a school size low in pupil numbers, for example in a school of 5 or
fewer children based on potential future intake.  At Glenlivet Primary School,
to meet the needs of current children in school, British Sign Language (BSL)
will be delivered as a third language this coming year instead of German. 
10.33. Aberlour, Glenlivet and Knockando Primary Schools benefit from a very small
amount of Pupil Equity Funding and use this creatively to support identified
children, with interventions reaching further than those where impact is
directed.  Aberlour Primary School focus in on Literacy interventions,
Numeracy and Health & Wellbeing approaches.  Glenlivet Primary School has
identified gaps in Health and Wellbeing and run a successful Breakfast club,
improving engagement in learning.  In order to support Health and Wellbeing
for all, swimming lessons have been provided where half of the school had
never swam, building confidence in swimming, team working and wider
mental, physical and social wellbeing effects.  Knockando Primary School has
supported literacy, numeracy and Health and Wellbeing with the purchase of
various learning supports including additional Pupil Support Assistant hours
for targeted support and Health and Wellbeing inputs.   
10.34. Schools also look outwards and seek to source additional supports and wider
experiences for children.  Heritage Lottery Funding supported Glenlivet
Primary School in a four year programme with a group of artists, significantly
developing children’s artistic and digital technology skills.  Although this
project has now finished, a legacy of skills and equipment remain which
Glenlivet continues to make use of for learning and teaching. 
10.35. Aberlour, Glenlivet and Knockando Primary Schools all have Parent Councils
formed who meet regularly throughout the year.  Aberlour Primary School
Parent Council represent the views and interests of parents and pupils and
support school improvement where there are currently ten parent members. 
Glenlivet Primary School regularly engages with parents and a supportive
Parent Council take forward an active role in driving forward school
improvement.  There is a very strong sense of community with the school
vision ‘success for all’ understood by all.  Sustainable partnerships with
parents and the wider community further enrich the curriculum and children
are supported to take an active part in the school and wider community. 
10.36. At Knockando, an active and supportive Parent Council fundraise for school
trips and activities and also contribute to bringing in specialists to enhance the
curriculum with dance, sport, music, drama and outdoor education.  Parents
Page 190

Page 191

29 
may also use their individual skills to support learners through ‘Activity
Afternoons’.   If Inveravon were to re-open then there would be potential for a
Parent Council to operate.  However, with a small pupil cohort there would be
a limited number of families able to participate – particularly where sibling
groups may feature – resulting in greater reliance on a few individuals to
support the school in this way.   
10.37. Aberlour, Glenlivet and Knockando Primary Schools are central
establishments within their respective communities with strong links to other
organisations including local churches.  Effective transition programmes and
links with other Associated School Group schools including Speyside High
School as the local secondary school are in place.  Working in collaboration
across the Associated Schools Group, Head Teachers and schools ensure all
children continue to access a wide range of experiences and activities,
ensuring their location does not detract from opportunities available. 
Glenlivet, Knockando, Tomintoul and Craigellachie Primary Schools also work
in partnership to organise transition events throughout the year for Primary 7
pupils, to support team building and wider skills development in advance of
secondary transition.   
10.38. Section 3 of the Standards in Scotland’s Schools etc Act 2000 requires local
authorities to endeavour to raise standards and secure improvement in the
quality of school education provided in our schools for all learners.  It is Moray
Council’s view that the pupils from the Inveravon catchment derive
educational benefits from their current attendance at other larger neighbouring
schools. Formalising the current arrangements would provide a number of
such benefits, judged against both the Moray and National criteria set out
above. 
10.39. As all pupils from the Inveravon Primary School catchment currently attend
Knockando Primary School or Aberlour Primary School depending on current
zoning arrangements or parental choice, no adverse effects for those pupils
are expected to arise from the permanent closure of Inveravon Primary
School. 
11. Effect on the Local Community 
11.1. Moray Council recognise that the uncertainty surrounding the future of the
school has impacted on the community and it is hoped that this statutory
consultation to close Inveravon Primary School will give clarity to the
community and a sense of certainty regarding their children’s education. 
11.2. Inveravon Primary School is situated in a rural location, with no
public/community buildings close by.  Inveravon Church is a short distance
from the school with a limited amount of dedicated parking. 
11.3. Several meetings have been held with the local community and parents in the
catchment area of the school. Although attendance at these meetings was
low, representatives from the Community Association raised concerns that
Page 191

Page 192

30 
there would be no community space in the area such as a meeting place,
picnic or play area for the community. 
11.4. Prior to the school closing the church had occasional community use of
Inveravon Primary School and there was also a badminton club that used the
school hall.  There has been no community use of the land or building since
the school was mothballed in 2017. 
11.5. The site is owned by the Ballindalloch Estate and was ‘gifted’ to Banffshire
Council in early 20th century for educational use. Moray Council are currently
‘custodians’ of that gift and if the school is closed the land and buildings would
revert back to estate ownership.  Ballindalloch Estate would welcome input
from the community as to sustainable options for the building and land use
should the proposal to close the school be approved. 
11.6. Tomintoul and Glenlivet Development Trust conducted some consultation with
the community in April 2021 about general community priorities, including
community assets.  The community expressed three favoured options for the
future use of the school: 
• Reinstated as a school
• Community space for activities
• Outdoor activity centre   
11.7. Aberlour is the closest town, approximately 6 miles from the school, with
public amenities, including a swimming pool, high school, local shops and
public parks.   Knockando and Glenlivet Primary School are equidistance from
the school, approximately 6 miles. 
12. School Transport 
12.1.  During the 2016/17 session entitled pupils were provided with transport to
Inveravon Primary School at a cost of £208.34 per day. With mothballing
pupils were provided transport to Knockando Primary School on existing
contracts at no additional cost. 
12.2. Three new contracts currently support ALL pupils attending Knockando
Primary School at a total cost of £557.55 per day. Ten pupils within the
Inveravon catchment are transported to Knockando schools. 
12.3. The closure of Inveravon School will not impact upon the current journey
times for the majority of catchment pupils as they are currently being
transported to Knockando. The average travel time compared to travelling
to/from Aberlour or Glenlivet primary schools would be the same as
Knockando Primary School under normal conditions. 
Page 192

Page 193

31 
12.4. It is recognised that rezoning some areas of the Inveravon catchment to
Aberlour or Glenlivet primary schools may increase the number of children
entitled to school transport. 
13. Financial Implications 
13.1. As mentioned in Section 12 above the proposed changes could result in an
increase in costs for school transport provision, which would need to be met
by Moray Council. The increase is expected not to be significant and may be
managed within the value of the current Speyside ASG transport contracts. 
13.2. Further details of the financial impact of this proposal are included in the
financial template provided at Appendix B. The costs provided in the template
derive from 2016/17 when the school was last operational for a full session,
which has been corrected for inflation to provide a forecast for 2022/23 if
Inveravon Primary School was reopened. With a potential school roll of 5 this
would equate to a cost of £31,415 per pupil per year against a Moray average
of £7,225 per pupil per year (2019/2020 data). 
14. Sustainability 
14.1. A carbon assessment of Inveravon Primary and Knockando Primary - where
the majority of pupils moved to at the time of mothballing - by the Climate
Change Strategy Officer is summarised in the table below: 
Building Heat  Electricity Water Total 
CO2
Emissions
(Tonnes)
Carbon
Impact
per
Pupil
CO2
Emissions
(Tonnes)
Carbon
Impact
per
Pupil
CO2
Emissions
(Tonnes)
Carbon
Impact
per
Pupil
Annual
CO2
Emissions
(Tonnes)
Inveravon
(2016/17) 
27.2 3.0 3.4 0.4 0.06 0.007 30.66
Knockando
(2017/18) 
24.4 0.4 14.9 0.3 0.16 0.003 39.46 
14.2. The additional school transport mileage associated with travel to and from
Knockando Primary School for pupils local to Inveravon Primary School
requires to be considered but as there are no fixed school transport routes -
contractors are given a pupil address list and work out the most efficient route
- it is therefore not possible to assess the detailed impact of the additional
mileage with mothballing or closure of Inveravon Primary School. 
14.3. Overall the carbon impact per pupil is substantially lower at Knockando – and
that includes the pupils on the school roll from the Inveravon catchment from
Aug 2017.  The reopening of Inveravon Primary School would therefore
significantly increase carbon emissions in the future, outweighing any
additional transport emissions associated with longer pupil journeys.  The
Page 193

Page 194

32 
closure of Inveravon Primary School is therefore predicted to lead to carbon
savings for Moray Council. 
14.4. Teacher recruitment and retention is a challenge faced by many rural
authorities in Scotland. Rural schools with small numbers of pupils on roll
changes the teaching dynamic, requiring teachers to be highly adept in
managing the curriculum, differentiation and assessment for pupils from
primary 1 - 7 in one or just two classes to ensure an educational benefit is
maintained.  Due to the staffing complement within these establishments the
opportunities for collegiate and stage partner working requires carefully
planning with their paired school or others local schools within the ASG and
increased use of digital resources to allow online communities, however some
rural settings also have connectivity difficulties. 
15. Implications for Staff 
15.1. As a consequence of mothballing an interim teaching staff arrangements were
implemented as per the table below. There were no changes to non-teaching
support staff. 
FTE (before mothballing) FTE (post mothballing)
Head Teacher 0.5 1.0
Principal Teacher 1.0 1.0
Class Teacher 1.0 1.0
McCrone 0.28 0.28
Total 2.78 3.28 
15.2. In the event of Inveravon Primary School closing the amended teaching staff
arrangement are as per table below 
FTE (during mothballing) FTE (post closure)
Head Teacher 1.0 (SP4) 1.0 (SP2)
Principal Teacher 1.0 
Head Teacher Relief  0.46
Class Teacher 1.0 1.0
McCrone 0.28 0.28
Total 3.28 2.72 
The Head Teacher would move to SP4 from SP2 – cash conserved for 3
years.  The Principal Teacher would need to be redeployed and potentially
cash conserved for 3 years. 
16. Equal Opportunities 
16.1. An Equality Impact Assessment (EIA) is a statutory requirement on the
Council to assess the policies and practices necessary to meet the
requirements of anti-discrimination and equalities legislation. It also affords an
Page 194

Page 195

33 
opportunity for the Council to consider the impact on the education service. An
assessment has been carried out, as part of the options appraisal process. 
16.2. The aim of an EIA is to examine policies and practice in a structured way to
make sure that adverse effects on groups with protected characteristics are
avoided. It is also a tool to enable the Council to assess what positive steps it
can take to promote equality of opportunity and measure the results of the
actions that have been taken. 
16.3. The main adverse effect for children in the P1-7 age group is the length of
journey from Inveravon to Knockando, Aberlour or Glenlivet, however, as the
school has been mothballed since July 2017, all the current pupils are already
making the journey to either Knockando or Aberlour. Should there be future
journeys to Glenlivet these would be of a similar distance and duration. 
16.4. Funded school transport would be provided for all entitled P1-7 pupils
attending Knockando, Aberlour or Glenlivet primary schools from the current
Inveravon catchment area, if one of the proposed options is approved. 
16.5. As part of the consultation process the Council will consult with a wide range
of stakeholders, including staff, parents/carers and young people, and will
address comments about equality during this consultation. 
16.6. Under the Equality Act 2010 education providers must not treat disabled
pupils less favourably and should take reasonable steps to avoid putting
disabled pupils at a substantial disadvantage. Any existing arrangements in
place for pupils within the schools affected with additional support needs will
continue. As discussed in 10.28, Aberlour Primary School is the enhanced
provision hub for the Speyside ASG, and as such is fully adapted to meet the
requirements of pupils with a range of additional support needs. 
17. Consultation Arrangements 
17.1. At its meeting on 24 August 2022, Moray Council’s Education, Communities
and Leisure Services Committee were asked to agree that a proposal
document should be issued as a basis for consultation. No decision will be
taken by the Council on the proposal contained in the paper until after the end
of the consultation period. The Council will then receive a report on the
consultation and will reach a view on the proposal. 
17.2. A copy of this document will be issued to all of the consultees listed on the
first page of this document and it will also be published on the Council’s
website:  http://www.moray.gov.uk/moray_standard/page_105407.html       
17.3. Reading copies of this proposal document will be made available at Speyside
High School Community Centre, Aberlour Library, Glenlivet Medical Centre,
Ballindalloch Post Office, Elgin Library, Knockando Primary School, Aberlour
Primary School and Glenlivet Primary School. 
Page 195

Page 196

34 
17.4. The period for consultation will run from 29 August 2022 until 7 October 2022
which adequately covers the statutory requirement period of 30 school days. 
17.5. A face-to-face public meeting will be held at 1:30pm on Tuesday 27
September 2022 at Inveravon Church, Ballindalloch AB37 9BA. A further
public meeting will be held at 7pm on Tuesday 27 September at Speyside
High School, Mary Avenue, Aberlour AB38 9QU. Anyone wishing to attend the
meetings are welcome. 
17.6. An online meeting will be planned for Wednesday 28 September and anyone
wishing to attend this meeting should express their interest by emailing
learningestate@moray.gov.uk 
17.7. The meetings will be convened by the Council and the Council will present the
reasons for bringing forward the proposal. There will be an opportunity for
questions and comments at both meetings. A minute will be taken so that
comments can later be summarised and considered. 
17.8. Opportunities will be provided for the staff working in Knockando, Aberlour
and Glenlivet primary schools to discuss the proposals. Opportunities will also
be arranged for impacted primary pupils at each of the schools to engage in
the consultation in a manner appropriate to their age. 
An online survey will be available as part of the consultation. This can be
completed at the following address -
http://www.moray.gov.uk/moray_standard/page_105407.html -  or by scanning the QR
code below: 
17.9. The Council will also consider any written comments which should be emailed
to LearningEstate@moray.gov.uk . Alternatively, any comments can be sent
to Community Support Officer (Learning Estate), HQ Room 207a, Elgin
Council Offices. High Street Elgin IV30 1BX. Comments should be received
no later than 4pm on 7 October 2022. 
17.10. A copy of this document will also be sent to Education Scotland. They will also
receive a copy of any relevant written representations that are received by the
Council during the consultation period. They will also receive a copy of any
oral representations made at the public meeting and a copy of any other
Page 196

Page 197

35 
relevant documentation. Education Scotland will then prepare a report on the
educational aspects of the proposal. In preparing their report, they may visit
the school and make such reasonable enquiries as they consider appropriate. 
18. Consideration of Consultation Responses 
18.1. The Council will review the proposal having regard to the Education Scotland
Report, survey results, written representations that it has received, and oral
representations made to it by any person at the public meeting. It will then
prepare a report on the consultation. This report will be published in electronic
format and will be available on the Council website. Anyone making written
representations during the consultation period will be informed about the
report. 
18.2. The report will include a record of the total number of written representations
made during the consultation period, a summary of the written representations
and a summary of the oral representations made at the public meeting. The
report will also include the Authority’s response to the Education Scotland
Report, a response to issues raised through any written or oral
representations it has received, together with a copy of the Education
Scotland Report and any other relevant information, including details of any
alleged inaccuracies and how these have been handled. The report will also
contain a statement explaining how the Council has complied with the
requirement to review the proposal in light of the Education Scotland Report
and representations (both written and oral) that it received. 
18.3. The last section of the report will include an officer recommendation as to
whether the proposals should be adopted and implemented. The Consultation
Report will be published at least three weeks prior to the Council making a
decision. 
18.4. A final report on the consultation process with recommendations will
submitted to the Education, Childcare and Leisure Services Committee in
January 2023. 
19. Decision Making 
19.1. The consultation report will be considered by Education, Communities and
Leisure Services Committee who will be asked review and make a comment
on the officer recommendation. 
19.2. Following discussion and recommendation at the Education, Communities
and Leisure Services Committee, Full Council will consider the report and be
asked to approve the officer recommendation in the report. This is expected to
be February 2023. 
19.3. At the end of the consultation process, Section 15 of the Schools
(Consultation) (Scotland) Act 2010 enables ministers to call-in a decision to
implement the proposed closure of Inveravon Primary School. 
Page 197

Page 198

36 
19.4. Beginning on the day that the final decision is taken, the Council has a period
of six working days to notify Scottish Ministers of the decision. Scottish
Ministers then have a period of eight weeks from and including the date of
decision to decide if they will call in the proposal. The Council must publish
the fact that the Scottish Ministers have been notified and that representations
can be made to the Scottish Ministers within the first three weeks of the eight-
week period. The Scottish Ministers will take into account any relevant
representations that were made to them by any person within the first three
weeks. The Council may not proceed with the implementation of the proposal
until this eight-week period has passed. 
19.5. If the Scottish Ministers decide to call in a closure proposal, it is then referred
to the Convener of the School Closure Review Panels who has a period of
seven days after a call-in notice is issued to constitute a School Closure
Review Panel. The Panel may decide to refuse consent to the proposal,
refuse consent and remit it to the education authority for a fresh decision or
grant consent to the proposal, either subject to conditions, or unconditionally.
The Panel must notify the education authority of its decision within eight
weeks from when the Panel was constituted or within 16 weeks if the Panel
has issued a notice to the education authority that a decision has been
delayed. The Council may not proceed with the implementation of the
proposal until the outcome of the call-in has been notified to the Council. 
20. Conclusion 
20.1.  Taking the above into account Moray Council recommends that Inveravon
Primary School, currently mothballed, is closed and the catchment area re-
assigned to either Knockando Primary School, a combination of the
Knockando and Aberlour primary schools or a combination of Knockando,
Aberlour and Glenlivet primary schools as outlined in Options 1-3 above. 
20.2. Whichever decision is taken with respect to catchment areas, existing pupils
will not be required to change schools. This will also apply to any younger
siblings of such pupils, provided they remain at the same primary school. 
20.3. This proposal paper is issued in terms of the authority’s procedures to meet
the relevant statutory requirements. 
Appendix A - Inveravon Primary School Options Appraisal
Appendix B – Inveravon Primary School Financial Report 
Page 198

Page 199

1 
Appendix A1
Inveravon Primary School Options Appraisal 
1. Introduction 
Moray Council strives to allocate its resources in a way that ensures the quality of all
its services. It attaches particular importance to providing the best possible
educational experience for all pupils within its schools.  
The Strategic Approach to the Learning Estate was agreed at a Special Meeting of
the Moray Council on 9 October 2020 in accordance with Scotland’s Learning Estate
Strategy (Connecting People, Places and Learning). The Council’s strategy sets out
the council’s aspirations for our schools using a holistic place-based approach, which
will ensure that services can be delivered in an optimum way, making best use of
available assets.
The Schools (Consultation) (Scotland) Act 2010 requires that educational benefits
should be at the heart of any proposal to make a significant change to schools, for
current and future pupils in the area.  
At its meeting on 24 November 2021, the Education, Children’s and Leisure Services
Committee agreed to the preparation of an options appraisal regarding the future of
Inveravon Primary School and supported community engagement as part of the
options appraisal process to identify alternative options to consider. 
2. Background / Discussion 
During the 2016/2017 school session the school roll at Inveravon Primary School
dropped due to a number of families moving schools for several reasons. As the
school session drew to a close it was clear that there was a risk that at the start of the
2017/2018 session that the school roll would be significantly lower than the total
catchment of 13. In fact, as of August 2017 the school roll was zero as all catchment
children were enrolled at either Knockando or Aberlour Primary.
Due to no children attending the school for the start of the new 2017/18 session, the
Education Service was left with no alternative but to mothball Inveravon Primary
Item 16*
Page 199

Page 200

2 
School. Mothballing is a temporary closure of a school which does not in itself lead to
statutory consultation. Reference is made to the report considered by the Children
and Young People’s Committee on 23 August 2017 where this decision was ratified. 
The Primary 1 admission period for all Moray Schools takes place in January each
year. No applications to Inveravon Primary School have been received since the
school was mothballed.  
The deadline for submitting out of zone placing requests is March each year. There
have been no applications received for pupils wishing to attend Inveravon Primary
School through the placing requests process over the last three years.   
As there continues to be no expectation of pupils enrolling at Inveravon Primary
School, the school remains mothballed.  
3. Community Engagement 
The Learning Estates Team conducted the following engagements with the wider
Inveravon community to keep them fully informed and to explore potential options for
the future of Inveravon Primary School.  
• Wednesday 9 February 2022 – A virtual community engagement session
facilitated by MS Teams. 
• Tuesday 8 March 2022 - A virtual community engagement session facilitated
by MS Teams. 
• Tuesday 8 March 2022 - Community engagement session at Speyside High
School
• February to June – A comments form was provided – both online and mailed
to parents within catchment – to allow community stakeholders to provide informal
comments and suggestions on the future of Inveravon Primary School. This has been
available since 16 February 2022 to 28 June 2022.   
A summary of all comments gathered during and following the meetings and the online
survey is at Appendix A to this report. 
4. Options Appraisal 
An options appraisal has been undertaken to consider the future of Inveravon Primary
School to ensure the best educational and wellbeing benefits for Inveravon children.
The appraisal considered the current mothballing and the schools the families had
chosen to attend prior to and during mothballing.    
Page 200

Page 201

3 
4.1 Inveravon Primary School
The majority of the Inveravon Primary School was ‘gifted’ to the Council by the
Ballindalloch Estate in 1910 as a site for a school. A further area of land was
purchased by the Council in 1926 to increase the available land for outdoor play. In
the event of a school closure the land, and by implication the school building would
be returned to the Ballindalloch Estate. The plot of land purchased is deemed of
having no value in isolation and it is proposed that this is gifted to Ballindalloch Estate
at no cost in the event of school closure.
Inveravon Primary School was built in the early 20th century. The school is non-
denominational and serves properties within the rural area of the Ballindalloch Estate.
It is located by the A95 just north of the Bridge of Inveravon 6.5 miles from Aberlour. 
Inveravon Primary School has a functional capacity of 50 pupils. It is a single storey
building with two classrooms, kitchen, hall, resources room, library reception/staff
room.  The hall doubles as both a dining room and indoor PE area. The school
floorplan is attached as Appendix B and a map of the school ground and its
surrounding amenities is shown in Map 1 below. 
Map 1 – Inveravon Primary School 
The school has a servery kitchen which served meals that were prepared at Aberlour
Primary and delivered to Inveravon Primary School on a daily basis.
The outside areas consists of a small concrete play area on the north aspect of the
building which extends to adjacent grassed area
Inveravon Primary School delivered primary education from P1 to P7. There was no
nursery on site and local children often attended nursery at other nearby schools.       
Page 201

Page 202

4 
Condition is an assessment of the physical condition of the school building and its
grounds. Inveravon Primary School was assessed C for condition a number of years
prior to mothballing. A more recent condition survey in June 2022 has assessed that
the overall condition remains at C (Poor - Showing major problems and/or not
operating adequately - the school buildings require continuous repair and shows
signs of age), although a number of elements are now at condition D (Bad –
Economic life expired and/or risk of Failure (the school buildings and grounds do not
support the delivery of services to children and communities). A breakdown of the
condition elements is shown in the table below. 
Roofs
Floors and Stairs
Ceilings
Ext Walls, Windows and
Doors
Int Walls and Doors
Sanitary Services
Mechanical
Electrical 
Decoration
Fixed Int Fixtures,
Furniture and Fittings
External Areas
Outdoor Sports Facilities
Overall Score
Condition Category
C D C C B C D D C B D N/A 42.27% C
Table 1. Core Condition Assessment (Overall and Individual Elements) 
Suitability is an assessment of the school as a whole, the buildings, the grounds and
the impact they have on teaching and learning, leisure and social activities, as well as
the health and wellbeing of users. The Suitability assessment of Inveravon Primary
School was carried out in 2013 the school was graded as B, satisfactory – performing
well but with minor problems (school buildings and grounds generally support the
delivery of services).  
4.2 Inveravon and Local Area
The Scottish Government Urban Rural Classification defines Inveravon Primary
School as “remote rural”, meaning that is it serves a population of less than 3,000 and
is more than 30 minutes’ drive from a settlement of 10,000 or more.
The Inveravon Primary School catchment is bordered by Aberlour, Glenlivet,
Knockando and Tomintoul schools within the Moray Learning Estate. It is also
bordered to the west by Grantown Primary School in the Highlands Council area.
Map 2 below shows the catchment area for Inveravon Primary School and the
neighbouring schools.  
Distances between Inveravon School and surrounding schools sourced from Google
Maps are listed below: 
Knockando Primary School   6.6 miles 
Aberlour Primary School     6.6 miles 
Glenlivet Primary School    5.5 miles 
Page 202

Page 203

5 
In addition, the distance to the Speyside High School, in Aberlour is 6.7miles
The Scottish Index of Multiple Deprivation (SIMD) is a measure of deprivation across
6,976 data zones. SIMD ranks data zones from most deprived (ranked as 1) to least
deprived (ranked as 6,976) and the Inveravon data zone (South Speyside and
Cabrach) is ranked at 3696. Within this ranking geographical access is the biggest
level of deprivation, followed by Education/Skills. Income and Employment are
relatively good while Crime and Health are ranked as the least deprived. A graphical
breakdown of this information is below. 
Table 2. SIMD 2020 Ranking - South Speyside and Cabrach  
Page 203

Page 204

6 
4.3 Rural Sustainability and Housing Development
Inveravon is within a community located within the Ballindalloch Estate area with basic
services including a combined rural shop and post office. The community straddles a
fast-flowing section of the main Elgin to Grantown-on-Spey trunk road (A95). 
Information received from The Council’s Community Economic Development Team
indicates that there are no significant new business activities in the Inveravon area. 
There is no significant housing development for the Inveravon catchment within the
current Local Development Plan. 
4.4 Demographics and Pupil Numbers  
In the 5 years up to the mothballing of Inveravon Primary School in Aug 2017 the
school roll remained steady at between 14-15 pupils with few placing requests to and
from the catchment.   
The school roll had been low for a number of years.  The P1 intake had ranged from
zero to four pupils in each of these years.  The position is shown in the table below: 
Census data 2014 2015 2016 2017 2018 2019 2020 2021
P1-P7 15    15  13   0   0  0   0   0  
Table 3 - School Roll Data 2014-2021
There are currently 15 children of P1-P7 age residing within the catchment area of
Inveravon School (Census data extract September 2021). These children all attend
other schools in the area, all by parental choice. The majority attend Knockando
Primary School with a smaller number at Aberlour School. 
School roll forecasts show a very small number of families living in the catchment area
with children that are under school age.  SEEMIS data indicates there were 2 children
within the Inveravon catchment that could have enrolled for P1 in August 2022 but no
requests were made. A similar number of children can enrol in 2023 and 2024 but if
they did the school roll numbers would remain below 10.
4.5 Occupancy
In line with the Learning Estates Strategy an ideal school occupancy level would be
approximately 80%, aspiring to the occupancy band of between 60% and 80%. 
At its peak the school roll had 15 pupils in the 2014-2015 session – an occupancy of
just 30%. Such a low occupancy level is unsustainable, unaffordable and does not
offer best value. 
Page 204

Page 205

7 
4.6 Pupil Enrolments
No families have approached Moray Council to enrol their children at Inveravon
School, either as a new P1 start or as a placing request. Additionally, no families have
approached officers to indicate that if there were sufficient other families in a similar
position that they would consider moving their children back to the school. 
4.7 Inveravon Community  
While in operation, the school did not operate a breakfast or after school club and
there were no formal lets of the school. The children and the community did have free
access to the school garden and the hall for badminton.  
Speyside Community Centre is adjacent to Speyside High school and is approximately
6.7 miles away.  The Community centre has a swimming pool, fitness suite, climbing
wall and outdoor pitches with a regular programme of activities.  Both the School and
Community centre has a range of rooms and facilities for hire for activities such as
exercise classes, courses, committee meetings, sports and hobbies, counselling
sessions, training sessions and rehearsals.
Glenlivet Public Hall is approximately 6.1 miles away, the hall is used by a number of
groups for regular weekly meetings involving sports, music, dancing and more. 
Beside these regular user the hall aims to provide a venue for other public events. 
Behind the hall there is a football pitch.  The football pitch is used regularly by the
football and archery clubs and can be booked for private events.
4.8 Options for Consideration 
Some comments proposed that the school reopen. However, this requires families
wishing to send their children to the school. As no new pupil enrolments had been
received for the 2022-23 session, reopening of the school was not possible. On this
basis the school continues to be mothballed.    
Alternative suggestions for the school building were received with the focus on
community use and economic development. Due to the land ownership situation these
options would require commitment from other agents. These options cannot be
implemented without the formal closure of the school.  
A full list of suggestions and comments with an overview of the requirements for them
to be implemented can be found in the below table.  
No. Comment/Suggestion  Requirement for implementation 
1  Community space for activities School closure process - private
provider commitment
2  Outdoor activity centre   School closure process - involvement
of private provider
Page 205

Page 206

8 
3  Community cafe School closure process - private
provider commitment
4  Rural business centre  School closure process - private
provider commitment
5  Residential property  School closure process - private land
owner commitment
Table 4 – Alternative use suggestions 
The following options were considered for the future of Inveravon Primary School as
part of the options appraisal: 
1 Reopen the school – No pupils have enrolled at the school and no families
have indicated that they would wish to attend the school. This option has been
discounted. 
2 Continue Status Quo – School remains mothballed for a further session and
potentially beyond. The school has been mothballed since August 2017, such
prolonged time has already caused uncertainty for families and the community.
Therefore, this option has been discounted. 
3 Consider closing Inveravon Primary School and rezoning pupils to attend
another school in the Speyside Associated Schools Group. 
5. Conclusion 
One of the options identified as part of the appraisal is to close Inveravon School. This
is currently considered to be the only viable option for the school; therefore, Moray
Council must undertake a statutory consultation under the Schools (Consultation)
(Scotland) Act 2010. As a rural school there is a presumption against closure and
Moray Council must ensure all other alternatives have been identified and robustly
considered prior to undertaking any statutory consultation on this matter.   
Appendix A - Community Engagement Comments and Suggestions
Appendix B - Inveravon School Floorplan  
Page 206

Page 207

9 
Appendix A – Community Engagement Comments and Suggestions 
(Received during informal engagement) 
The Learning Estate team engaged with the community over 4 sessions in order to
fully inform and explore the potential options on the future for Inveravon Primary
School.  
• 7 December 2021 – online Public meeting with the community and
parents to outline future engagement.
• 2 February 2022 – online public meeting to discuss future options for the
school.
• 8 March 2022 – community engagement session at Speyside High
School, Aberlour to further explore options.
• 10 March 2022 – meeting with parents at Knockando Primary School.
• 16 February 2022 to present – comment boxes available, and
opportunity to send comments via email to the Learning Estate Team. 
Residents in the catchment area were notified of the meetings by two mail drops. 
Details of the meetings were also published on the Moray Council website, social
media channels and distributed to the local media.  
Secure comment boxes were situated at Aberlour Library, Knockando Primary School
and Glenlivet Medical Practice from February to June 2022.  6 parent and 19 resident
comment were received during this period.
The table below provides an overview of the Comments and Suggestions from
community engagements (February 2022 - June 2022) 
Ref
No.
Comment/Suggestion Wants Requirements
for
implementation
1 Email – Parent (Inveravon
Catchment)
Whilst it would be lovely for our son to
attend school much closer to home than
Knockando, I strongly feel that the
quality of his social and academic
education should come first. Unless the
school roll can be reliably and
consistently at a level to facilitate age
appropriate group learning and play
activities then I would not support the
reopening of Inveravon Primary. By this,
I'm not an expert, but I would be
thinking in the order of 25+ pupils.
There is so much to be gained in the
social interactions and the things that
are possible with the increased 
School closure  School closure
Process
Page 207

Page 208

10 
numbers at the combined provision, but
for current skills development and in
preparation for high school and
beyond. 
A number of years ago there was
suggestion of a new build combined
school for Knockando, Inveravon and
Glenlivet at a site in Marypark. This
would have been excellent. 
I am very happy with the calibre of
teaching and support at Knockando, but
modern facilities (and space!) would
really benefit all the pupils. 
Whatever decision is made it must be
one that is in the best interests of
current and future pupils. 
I am well aware personally and
professionally of the implications in
regard to transport etc., but do not find
these unresolvable. 
There are of course wider community
benefits that come from having a school
facility in a rural community, but these
should not overshadow the main
function of the building. 
2 Inveravon Community Resident
(Meeting):
Any local parent looking for options for
schools would not see the school on
any part of the council website.  
School closure  School closure
Process
3 Survey – Parent (Inveravon
Catchment)
Children at Knockando their whole
school life.  Another starting in August. 
If they went to Inveravon they would be
in class by themselves which would be
unsettling for the child.
School closure School Closure
Process
4 Inveravon Community Resident
(Meeting):
Would love to make use of the school if
possible for community-based activities.   
Community
Space
School closure
Process –
Community
Commitment
5 Inveravon Community Resident
(Meeting):
Just looks like closing by stealth, take
the teachers away, head hunted, supply
teachers, no wonder the pupils were
taken elsewhere, a calculated move to
close it. 
Addressed at
meeting
6 Tomintoul and Glenlivet Trust   
Page 208

Page 209

11 
The trust conducted some consultation
with community in April 2021 about
general community priorities.  Included
community assets within the survey.  
3 main views around the school: 
o (1) Reinstated as school, 
o (2) Community space for
activities 
o (3) Outdoor activity centre 
School re-
opened 
Community
Space 
School closure
Process –
Community
Commitment
7 Inveravon Community Resident
(Meeting):
How irritating it is when you keep saying
that there has been no-one interested in
joining the school, it was taken off the
website and people told on the phone
that school was closed, no wonder there
has been no interest, teacher head
hunted 
Addressed at
meeting
8 Inveravon Community Resident
(Meeting):
How many schools have been
mothballed in the last 10 years? 
Addressed at
meeting
12 Inveravon Community Resident
(Meeting):
Problem with getting roll over 10, unless
you get 10 sets of parents, it’s a catch-
22 
Addressed at
meeting
13 Inveravon Community Resident
(Meeting):
If and when council decide it is to be
closed, does council make it habitable? 
Addressed at
meeting
14 Inveravon Community Resident
(Meeting):
Why did it take so long from mothballing
in 2017 until now to progress the future
of Inveravon PS? 
Addressed at
meeting
15 Inveravon Community Resident
(Meeting):
Have we had any formal response from
parents of primary school children in
Inveravon catchment? 
Addressed at
meeting
16 Inveravon Community Resident
(Meeting):
Has and will the building be kept wind
and water tight and repair and
maintenance be undertaken while
school remains moth balled? 
Addressed at
meeting
17 Inveravon Community Resident
(Meeting): 
Addressed at
meeting
Page 209

Page 210

12 
Will this repair and maintenance activity
include the garden and grounds?
18 Is there anything of any value within the
school that could be reused – or
donated (e.g. Ukrainian appeal)? 
Followed up post
meeting
19 Inveravon Community Resident
(Meeting):
Can you confirm who would be
responsible for the building in the event
of its closure? 
Addressed at
meeting
20 Inveravon Community Resident
(Meeting):
Having attended Inveravon Primary
myself as a child and now seeing my
children currently attend Knockando
Primary I feel the resources are/can be
better used by directing them fully to
Knockando.  I feel the school at
Knockando is very well run (in our
experience) and being part of a slightly
larger school community with access to
better resources if far more beneficial
for our children.  Families have the
option of applying to Aberlour &
Glenlivet also which again fields
resources/funding to established
learning communities.
Rural schools are very important but in
this case our family feels there are
better opportunities at other schools
which would be further enhanced if
funding was not re-directed to re-
opening Inveravon and rather put
towards the other ‘rural’ schools still
open in the area.
I have very fond memories of my time at
Inveravon but in this current age, this
school is no longer sustainable in my
opinion. 
School
Closure 
School Closure
Process
22 Survey – Parent (Inveravon
Catchment)
Close it, sell it! 
School
Closure 
School Closure
Process
22 Survey – Parent (Inveravon
Catchment)
As a parent of 2 school aged children, I
feel Inveravon needs closed completely,
ASAP. My children are very happy
attending Knockando Primary School
and I would not be moving then under
any circumstances. 
School
Closure 
School Closure
Process
Page 210

Page 211

13 
It also seems unfair that Knockando
Primary cannot have a permanent Heat
Teacher until this is resolved.
23 Survey – Parent (Inveravon
Catchment)
We feel Inveravon Primary should be
closed and financial & staff resources
should be consolidated to provide a
modern equipped resource for the wider
area. 
School
Closure 
School Closure
Process
24 Survey – Parent (Inveravon
Catchment)
I think Moray Council needs to fully close
Inveravon as it is just wasting money which
could be used to improve education
elsewhere in the area.  There will never be
enough children to deem the school fit to be
open so it needs to be closed not
mothballed. 
School
Closure 
School Closure
Process
25 Inveravon Community Resident
(Meeting):
This was a lovely primary school which was
very outgoing in the community.  Even
though I live in Aberlour I attended the PTA
quiz nights, etc. 
It is so sad not to see the building in use for
it’s intended purpose – as it is one of the
basics of a community. 
I really hope that it will be re-opened. 
School re-
opened 
Page 211

Page 212

14 
Appendix B: Inveravon School Floorplan 
Page 212

Page 213

Appendix 2 
Community Engagement Comments and Suggestions 
(Received during informal engagement) 
The Learning Estate team engaged with the community over 4 sessions in order to
fully inform and explore the potential options on the future of Inveravon Primary
School.  
• 7 December 2021 – online Public meeting with the community and parents to
outline future engagement.
• 2 February 2022 – online public meeting to discuss future options for the
school.
• 8 March 2022 – community engagement session and Speyside High School,
Aberlour to further explore options.
• 10 March 2022 – meeting with parents at Knockando Primary School.
• 16 February 2022 to present – comment boxes available, and opportunity to
send comments via email to the Learning Estate Team. 
Residents in the catchment area were notified of the meetings by two mail drops. 
Details of the meetings were also published on the Moray Council website, social
media channels and distributed to the local media.  
Secure comment boxes were situated at Aberlour Library, Knockando Primary School
and Glenlivet Medical Practice from February to June 2022.  6 parent and 19 resident
comment were received during the period.
The table below provides an overview of the Comments and Suggestions from
community engagements (February and March 2022) 
Ref
No.
Comment/Suggestion Wants Requirements
for
implementation
1 Email – Parent (Inveravon
Catchment)
Whilst it would be lovely for our son to
attend school much closer to home than
Knockando, I strongly feel that the
quality of his social and academic
education should come first. Unless the
school roll can be reliably and
consistently at a level to facilitate age
appropriate group learning and play
activities then I would not support the
reopening of Inveravon Primary. By this,
I'm not an expert, but I would be
thinking in the order of 25+ pupils.
There is so much to be gained in the
social interactions and the things that
are possible with the increased 
School closure  School closure
Process
Item 16*
Page 213

Page 214

numbers at the combined provision, but
for current skills development and in
preparation for high school and
beyond. 
A number of years ago there was
suggestion of a new build combined
school for Knockando, Inveravon and
Glenlivet at a site in Marypark. This
would have been excellent. 
I am very happy with the calibre of
teaching and support at Knockando, but
modern facilities (and space!) would
really benefit all the pupils. 
Whatever decision is made it must be
one that is in the best interests of
current and future pupils. 
I am well aware personally and
professionally of the implications in
regard to transport etc., but do not find
these unresolvable. 
There are of course wider community
benefits that come from having a school
facility in a rural community, but these
should not overshadow the main
function of the building. 
2 Inveravon Community Resident
(Meeting):
Any local parent looking for options for
schools would not see the school on
any part of the council website.  
School closure  School closure
Process
3 Survey – Parent (Inveravon
Catchment)
Children at Knockando their whole
school life.  Another starting in August. 
If they went to Inveravon they would be
in class by themselves which would be
unsettling for the child.
School closure School Closure
Process
4 Inveravon Community Resident
(Meeting):
Would love to make use of the school if
possible for community-based activities.   
Community
Space
School closure
Process –
Community
Commitment
5 Inveravon Community Resident
(Meeting):
Just looks like closing by stealth, take
the teachers away, head hunted, supply
teachers, no wonder the pupils were
taken elsewhere, a calculated move to
close it. 
Addressed at
meeting
6 Tomintoul and Glenlivet Trust   
Page 214

Page 215

The trust conducted some consultation
with community in April 2021 about
general community priorities.  Included
community assets within the survey.  
3 main views around the school: 
o (1) Reinstated as school, 
o (2) Community space for activities 
o (3) Outdoor activity centre 
School re-
opened 
Community
Space 
School closure
Process –
Community
Commitment
7 Inveravon Community Resident
(Meeting):
How irritating it is when you keep saying
that there has been no-one interested in
joining the school, it was taken off the
website and people told on the phone
that school was closed, no wonder there
has been no interest, teacher head
hunted 
Addressed at
meeting
8 Inveravon Community Resident
(Meeting):
How many schools have been
mothballed in the last 10 years? 
Addressed at
meeting
12 Inveravon Community Resident
(Meeting):
Problem with getting roll over 10, unless
you get 10 sets of parents, it’s a catch-
22 
Addressed at
meeting
13 Inveravon Community Resident
(Meeting):
If and when council decide it is to be
closed, does council make it habitable? 
Addressed at
meeting
14 Inveravon Community Resident
(Meeting):
Why did it take so long from mothballing
in 2017 until now to progress the future
of Inveravon PS? 
Addressed at
meeting
15 Inveravon Community Resident
(Meeting):
Have we had any formal response from
parents of primary school children in
Inveravon catchment? 
Addressed at
meeting
16 Inveravon Community Resident
(Meeting):
Has and will the building be kept wind
and water tight and repair and
maintenance be undertaken while
school remains moth balled? 
Addressed at
meeting
17 Inveravon Community Resident
(Meeting):
Will this repair and maintenance activity
include the garden and grounds? 
Addressed at
meeting
Page 215

Page 216

18 Is there anything of any value within the
school that could be reused – or
donated (e.g. Ukrainian appeal)? 
Followed up post
meeting
19 Inveravon Community Resident
(Meeting):
Can you confirm who would be
responsible for the building in the event
of its closure? 
Addressed at
meeting
20 Inveravon Community Resident
(Meeting):
Having attended Inveravon Primary
myself as a child and now seeing my
children currently attend Knockando
Primary I feel the resources are/can be
better used by directing them fully to
Knockando.  I feel the school at
Knockando is very well run (in our
experience) and being part of a slightly
larger school community with access to
better resources if far more beneficial
for our children.  Families have the
option of applying to Aberlour &
Glenlivet also which again fields
resources/funding to established
learning communities.
Rural schools are very important but in
this case our family feels there are
better opportunities at other schools
which would be further enhanced if
funding was not re-directed to re-
opening Inveravon and rather put
towards the other ‘rural’ schools still
open in the area.
I have very fond memories of my time at
Inveravon but in this current age, this
school is no longer sustainable in my
opinion. 
School
Closure 
School Closure
Process
22 Survey – Parent (Inveravon
Catchment)
Close it, sell it! 
School
Closure 
School Closure
Process
22 Survey – Parent (Inveravon
Catchment)
As a parent of 2 school aged children, I
feel Inveravon needs closed completely,
ASAP. My children are very happy
attending Knockando Primary School
and I would not be moving then under
any circumstances. 
School
Closure 
School Closure
Process
Page 216

Page 217

It also seems unfair that Knockando
Primary cannot have a permanent Heat
Teacher until this is resolved.
23 Survey – Parent (Inveravon
Catchment)
We feel Inveravon Primary should be
closed and financial & staff resources
should be consolidated to provide a
modern equipped resource for the wider
area. 
School
Closure 
School Closure
Process
24 Survey – Parent (Inveravon
Catchment)
I think Moray Council needs to fully close
Inveravon as it is just wasting money which
could be used to improve education
elsewhere in the area.  There will never be
enough children to deem the school fit to be
open so it needs to be closed not
mothballed. 
School
Closure 
School Closure
Process
25 Inveravon Community Resident
(Meeting):
This was a lovely primary school which was
very outgoing in the community.  Even
though I live in Aberlour I attended the PTA
quiz nights, etc. 
It is so sad not to see the building in use for
it’s intended purpose – as it is one of the
basics of a community. 
I really hope that it will be re-opened. 
School re-
opened 
Page 217

Page 218

Page 218

Page 219

Appendix A3
Inveravon Primary School - Financial Report
Table 1 Column 1 Column 2 Column 3 Column 4 Column 5 Column 6 Column 7 Column 10
Row 1
Row 2
Name of School
Inveravon Primary School
Costs for full
financial year
(2016/2017 annual
costs)
Costs financial year
(2022/23 Forecast 
annual costs IF
REOPENED)
Additional financial
impact on receiving
schools [Knockando] - note 2
Annual recurring
savings (column 3
minus column 4)
Capital Costs School Proposed
for Closure Receiving School
Row 3 School Costs Capital Life Cycle cost - note 7 -                           -                         
Row 4 Employee Costs Third party contributions to capital costs -                           -                         
Row 5 Staff Costs - note 1 113,106.00£             142,721.00£             38,730.00£                                  103,991.00£              
Row 6
Row 7 Property Costs:
Row 8 property insurance 460.92£                     460.92£                     460.92£                       property insurance 460.92£                 
Row 9 non domestic rates 100% rural relief 100% rural relief 100% rural relief non domestic rates 100% rural relief
Row 10 water & sewerage charges 347.00£                     795.00£                     795.00£                       water & sewerage charges 141.00£                 
Row 11 energy costs 6,577.00£                 8,415.00£                 8,415.00£                   energy costs 439.00£                 
Row 12 cleaning (contract or inhouse) 81.00£                       82.00£                       82.00£                         cleaning (contract or inhouse) -£                       
Row 13 building repair & maintenance 576.00£                     576.00£                     576.00£                       building repair & maintenance - note 1,336.00£              
Row 14 grounds maintenance 650.00£                     650.00£                     650.00£                       grounds maintenance 655.00£                 
Row 15 facilities management costs - note 6 -£                           -£                             facilities management costs - note 6 -£                       
Row 16 revenue costs arising from capital -£                           -£                             revenue costs arising from capital -£                       
Row 17 other -£                           -£                             other
Row 18 PROPERTY COSTS SUB-TOTAL 8,691.92£                 10,978.92£               10,978.92£                 TOTAL ANNUAL COST UNTIL DISPOSAL 3,031.92£              
Row 19 School Operational Costs:
Row 20 learning materials 1,460.00£                 1,449.00£                 1,449.00£                   Table 4
Row 21 catering (contract or inhouse) -£                            
Row 22 furniture and equipment 231.00£                     230.00£                     230.00£                       -£                       
Row 23 other school operational costs (e.g. licences) 485.00£                     484.00£                     484.00£                       TOTAL NON-RECURRING REVENUE COST -£                       
Row 24 Curricular and Staff Support 350.00£                     346.00£                     346.00£                      
Row 25 Transport costs: note 3 208.34£                     557.55£                     557.55£                                       -£                            
Row 26 staff travel 309.00£                     310.00£                     310.00£                      
Row 27 -£                            
Row 28 SCHOOL OPERATIONAL COSTS SUB-TOTAL 3,043.34£                 3,376.55£                 3,376.55£                  
Row 29 SCHOOL COSTS 124,841.26£             157,076.47£             118,346.47£              
Row 30
Row 31 UNIT COST PER PUPIL PER YEAR (5) 24,968.25£               31,415.29£              
Assumed No of Pupils 5
1. The annual recurring savings on staff is the difference between school open and mothballed. A further saving of £45,175 will be
realised if Inveravon is closed and after cash conserved salary periods end (3 years from closure).
2. Due to small pupil numbers and no staff taken on during mothballing of Inveravon there is no impact on staff costs at either Aberlour
or Glenlivet primary schools if rezoned
3: Cost for pupil transport was not impacted when temporary rezoning to Knockando on mothballing of Interavon. Similarly the
recontracting for 21/22 would not be impacted in Inveravon did reopen
Notes
Table 3
Current revenue costs for school proposed for closure Table 2
Annual Property costs incurred (mothballing) until closure
Non-recurring revenue costs
Item 16*
Page 219

Page 220

Page 220

Page 221

MORAY COUNCIL LEARNING ESTATE PROGRAMME
Education, Communities & Organisational Development 
Appendix B
Public Consultation Meeting 
Closure of Inveravon Primary School
27 September 2022 at 1.30pm
In Person meeting at Inveravon Church
Moray Council Officers present:
Jo Shirriffs, Head of Education Resources & Communities; Andy Hall, Programme
Manager (Learning Estate); Stewart McLauchlan, Quality improvement Manager;
Jane Martin Community Support Officer (Learning Estate)
HMI Inspector Present
Sheila Brown
Elected Members present:
None
Public attendance
11 members of the public also attended – one of whom arrived during the
discussions.
Apologies:
No apologies were received.
1. Welcome and Introductions
Andy Hall opened the meeting and welcomed everyone to the meeting.  He
introduced the officer present and that a minute would be taken by Jane Martin.
Andy Hall confirmed the format of the meeting would be an overview of the proposal
by a PowerPoint presentation followed by an opportunity for discussion from the
floor. 
2.  Consultation Overview
Andy Hall informed the meeting that the proposal currently under statutory
consultation is the closure of Inveravon Primary School.  The consultation proposes
to discontinue education at Inveravon School, which is currently mothballed and re-
assign its catchment area to other school(s) within the Speyside High School ASG. 
3. Consultation process
The consultation is in line with the School (Consultation) (Scotland) Act 2010.  The
2010 Act’s principal purpose is to provide strong, accountable statutory consultation
practices and procedures that local authorities must apply to their handling of all
proposals for school closures and other major changes to schools.
The consultation will take into account
• Any reasonable alternatives to the proposal
• Specific requirements to be reviewed for a rural school
Item 16*
Page 221

Page 222

MORAY COUNCIL LEARNING ESTATE PROGRAMME
Education, Communities & Organisational Development 
• the likely educational benefits;
• the likely community impact; and
• the likely effect of any different travelling arrangements
These consultation processes are expected to be robust, open, transparent and fair,
and seen to be so.  The process runs Monday 29 August 2022 to Friday 7 October
2022. 
4. Background
No children have attended Inveravon Primary School since the end of session
2016/17, when the school was mothballed.   The decision to mothball was taken as
no pupils were enrolled from August 2017.  There have been no parents that have
chosen to enrol their children at Inveravon Primary School up to and including the
2022/23 sessions.  The number of primary school children in the Inveravon Primary
School catchment totals 15 for the 2022/23 session. 
There were a series of Community engagement on the school in February and March
2022 with online public meetings.  Comments boxes were left in key locations in the
area from February to August for the general public to make comments. 
The outcome of the Options Appraisal was presented to the Education, Childcare
and Leisure Services Committee on 24 August 2022.  After deliberation and a vote
approval was agreed by Councillors for Public Consultation on the closure of
Inveravon School. 
5. Options Considered
Alternatives to Closure:
• to re-open Inveravon Primary School with its current catchment area
• to continue with the current “mothballing” arrangement
Proposed Options:
• Option 1 - Close Inveravon Primary School and rezone to Knockando Primary
School.  As per current mothball arrangement.  Transportation will be provided
by the council.  Parental option to out of school catchment, transportation will
not be funded
• Option 2 - Close Inveravon Primary School and split catchment between
Knockando and Aberlour Primary School.  Considers Maryhill catchment
shifting to Aberour School.  Council funded transportation provided to
Knockando and Aberlour schools within respective catchments.  Parental option
to request school out of catchment, transportation will not be provided.
• Option 3 - Close Inveravon Primary School and split catchment between
Knockando, Aberlour and Glenlivet primary schools.  Considers Maryhill
catchment shifting to Aberlour School and small are to Glenlivet, determined by
Page 222

Page 223

MORAY COUNCIL LEARNING ESTATE PROGRAMME
Education, Communities & Organisational Development 
postcode.  Council funded transportation provided to Knockando, Aberlour and
Glenlivet within respective catchments.  Parental option for request school out
of catchment, transportation will not be funded.
Discounted Options:
• Option 4 - Close Inveravon Primary School and rezone with Aberlour Primary
School
• Option 5 - Close Inveravon Primary School and rezone with Glenlivet Primary
School 
Public submissions during consultation
• A copy of our statutory consultation document which proposes the closure of
Inveravon Primary School can be accessed on the Moray Council website at: 
• http://www.moray.gov.uk/moray_standard/page_105407.html  
• Full copies of the proposal are available for reference at Elgin Library; Aberlour
Library; Ballindalloch Post Office; Glenlivet Medical Practice; Aberlour Primary
School; Glenlivet Primary School; Knockando Primary School; and Speyside
High School. 
• If you would like to receive a copy by email or post, please contact the Learning
Estate Team by emailing learningestate@moray.gov.uk.  
• The consultation will run from 29 August until 7 October 2022 and an online
survey will be available as part of the process. This can be completed at the
following address or by scanning the QR code.
https://www.surveymonkey.co.uk/r/InveravonConsultation 
• Any written comments on the proposal must be received by Moray Council
within this time in order for them to be taken into account. They should either be
posted to Learning Estate Team, Moray Council Office, Room 207a, High
Street, Elgin, Moray, IV30 1BX or emailed to learningestate@moray.gov.uk 
6. Next Steps
• Phase 2 - Consultation (concludes 7 October 2022)
• Phase 3 – on submission of consultation and other documentation  Education
Scotland will prepare report on the educational aspects of the proposal (3
weeks)
HMI visit 25/26 Oct
Meetings at schools/parental sessions
• Phase 4 – Preparation and publication of consultation report 
• Phase 5 – Decision process
➢ 25 January 2023 - Recommendation to Education, Childcare and
Leisure Services Committee
➢ 1 March 2023 - Recommendation to and decision at Full Council
➢ If closure decision: Authority must notify Scottish Ministers with 6
working days Publish notice on website  
Page 223

Page 224

MORAY COUNCIL LEARNING ESTATE PROGRAMME
Education, Communities & Organisational Development 
Closure Decision
• Phase 6 – Ministerial call in
➢ Initial 3 weeks from notification of decision anyone can make
representation to Ministers
➢ Further 5 weeks for Ministers to decide whether or not to issue a call-
in notice
➢ During 8 week period the Authority cannot proceed to implement
proposed closure
• Phase 7 – School Closure Review Panel
➢ If Ministers call in
➢ Max 9 to 17 weeks
Non-closure Decision
• Phase 8 – Restriction on school closure for 5 years
7. Questions from the floor
Andy Hall opened the floor for questions, asking anyone wishing to comment may
do so.
Deputy Lord Lieutenant – The school is in bad order, how has this been allowed
to happen what will the cost to get the building back into order.
AH – Although this is a valid criticism, Inveravon is on par with other schools
across Moray.  A make-do-and-mend approach has been adopted across the
Moray school estate.  The school has been maintained wind and watertight and a
flood issue was addressed last winter.  During Covid there authority had different
priorities to meet.  The school and land is not owned by the authority but
Ballindalloch Estate and would be handed back.
Deputy Lord Lieutenant – appreciate that not enough resources from the
government are given to councils to look after schools.
Glenllivet & Inveravon Development Trust – Is this why we did not get parents
signing up for the school as it is not viable.
AH – There are historical reasons not related to school condition; the size of the
school role, peer interactions, parental choice.
Resident – I spoke to parents who were opposed not all parents were of the same
mind.
Resident – Parents won’t put their children to a school that has been mothballed.
Resident – How many schools have been mothballed in Moray?
AH – I am aware of only one school within last 15 year, Cabrach Primary School. 
The mothballing of Inveravon came into play when the school role fell to zero. 
Parents took the decision to move their children when families relocated and the
role fell to five in August 2017.  The council had no policy at the time to trigger
numbers to consider mothballing.
Page 224

Page 225

MORAY COUNCIL LEARNING ESTATE PROGRAMME
Education, Communities & Organisational Development 
SM - In terms of Education Benefits, we outlined the range of experiences and
opportunities presented from attending neighbouring schools in line with HMI
guidance.  Inveravon has been mothballed for 5 years and is not operational. 
Children indicate from responses that they are happy attending other schools and
have wider opportunities for mixing with peers, ages, engagement in group
activities and wide educational benefits.  Description is not provided regarding
education benefits for Inveravon where currently the school is mothballed and any
commentary would have been in past times, when the school was operating in a
very different climate.
Glenlivet & Inveravon Development Trust – Is Glenlivet Primary School at risk
of closing?
AH – It is not at risk, the current school role is twenty four and is steady for the
foreseeable future.  The Scottish Government Policy is to keep rural schools open.
Resident – My granddaughter had a great experience at the school, my daughter
was disappointed that she had to take her daughter out.  My personal view is that
other parents campaigned to keep it open.
Resident – I went to Inveravon has a child, we had a large room compartmented
to peer groups, this is as healthy as a large peer group.
AH – Nobody has said that the school was not performing.  The evidence we have
on the situation was that parents elected to move their children from the school
therefore the role fell to zero.
Resident – Once a school is mothballed it is doomed and becomes a foregone
conclusion, it is economically driven rather that educational.
AH – That is not the approach of Moray Council.  The 2010 Act protects all rural
schools.  If there is evidence of a desire to re-open Inveravon Primary School we
would, but we cannot remain in a mothballed situation indefinitely.  The driver is
that the school role is zero and there has been no interest in children enrolling
over the last 5 years.
Resident – Why was the school not showing on the Moray Council website as an
available school?  This was not an ideal situation to encourage parents to choose.
Why has it taken 5 years?  The decision has already been made.
AH – We are a relatively new team who have inherited the situation and realise
that errors may have been made in the past, when we were made aware of this
previously by yourself we remedied it immediately.  Covid put a halt on moving
forward with the school.
JS – We want to ensure you that we will presenting everything fully, notes are
being taken today of discussions and will be presented in the report.
AH – We have been open and honest about how thinks may have been done
better in the past.  Please respond to the consultation.  This information will be
Page 225

Page 226

MORAY COUNCIL LEARNING ESTATE PROGRAMME
Education, Communities & Organisational Development 
collated and included in the final report for Councillors to inform their future
decision.
Resident – Why has it taken over the 3 years recommended for mothballing?
JS – Acknowledge that this should have happened earlier. Various circumstances
led us into this situation.  Covid was one of the main contributing factors, also
there has been a staff restructuring within the Council during this same period. 
There is now the new team established to take forward the Learning Estate and
ensure this does not happen again.
Resident – Have you had discussions with councillors for the ward?
AH – Pre engagement discussions have been made with all councillors.
Resident – How much has been taken into account for the social circumstances
for residents, many who move into the area for rural living.  If the school is closed
the community have no chance for regeneration.
AH – The land and building is owned by the Ballindalloch Estate, if the school is
closed everything will be transferred back to them. We have and will continue to
forward ideas for the use of the school building should the decision to close be
taken that are provided to use via the previous engagement and current
consultation process. A number of these ideas – such as rural business hub –
seek to support area regeneration.
Resident – The Church built the school
AH – I was not aware of that. We do not have access to the original full title deeds
(which would be over 100 years old), our legal department are working on getting
access to these. What is not in doubt is the ownership issue – the land and, by
inference the building on it, would transfer to the Ballindalloch Estate if the school
closes.  A small strip of ground in the playground is owned by the council, it is not
viable in isolation and would be transferred also.
JS – This is a unique historical situation regarding the building, as Andy has said
our legal team are working on this.
AH – The Ballindalloch Estate have their own thoughts on regeneration. Although
we have no influence on the future we will share ideas from the engagement and
consultation process 
Resident – The discussion with the council is about the social loss.  Speyside
receive a disproportionate contribution are they looking at support for the social
factors. 
JS – This was picked up in the consultation proposal document, we can only work
with the information and data we have, it is difficult to invest if we cannot plan.
AH – Moray council does look at economic growth and nothing has changed in the
last 5 years
Page 226

Page 227

MORAY COUNCIL LEARNING ESTATE PROGRAMME
Education, Communities & Organisational Development 
AH – This will go to committee with elected members who will have the final
decision on the school with the information presented to them from the
consultation.
Resident – My mothballing understanding that the building stays in a functional
state.
JS – We have been dealing with a make-do-and-mend focus on schools that are
in use.
AH – I inherited the approach and is not the best way to manage old buildings. 
Incidents have happened in the school building over the last few years and theses
have been addressed.  A recent Conditions survey states that it is at a category C
which is in line with the majority of schools across Moray.
Resident – You should have come across and email I sent in 2018 regarding the
Gazebo and Polly Tunnel that the school fundraised for, that was destroyed and
taken down following mothballing.
AH – I have been made aware of this but do have any historical communications –
we continue to try and ascertain the facts about what happen will look to provide a
formal response in our consultation report.  We appreciate that issues during
mothballing could have been handled better and we have explained that this was
partly due to organisational restructuring, resourcing and COVID issues during this
same period.
Resident – There is a pattern in every step you have taken to close the school,
foregone conclusion!
Resident – What has been the involvement of the Councillors?  I contacted Walter
Wilson and received no reply.
AH – We went through the proposal document with local Councillors and they
have seen the evidence presented to them informally and in Committee.
The key things for what next is we have published and shared the proposals with
the community and councillors and engaging with the community with meetings
this afternoon and evening with an online meeting tomorrow 
We have two weeks to submit our consultation proposal and feedback to
Education Scotland.  They will have three weeks to respond, during this time they
will meet with parents and children of the schools and report.
Once complete we will prepare and publish the final Consultation report, capturing
all comments, but note that there may be some gaps in historical data for reasons
previously stated
Resident - In terms of options for the catchment, why has Glenlivet School not
been included we are a community.
AH – A full re-zoning to Glenlivet was not consider as there had been on historical
or recent desire at engagement session earlier this year for parents to send their
Page 227

Page 228

MORAY COUNCIL LEARNING ESTATE PROGRAMME
Education, Communities & Organisational Development 
children to Glenlivet.  In addition we also considered average distances of travel
and winter road conditions.
Resident – Did parents choose Knockando School and the few that went to
Aberlour?
AH – Our understanding is that the majority of parents choose to send their
children to Knockando as the schools share a Head Teacher and it was similar
rural school setting. During mothballing the Inveravon catchment has been
temporarily rezoned to Knockando so that transportation is provided. We are not
aware of the reasons why a couple of families elected to enrol their children at
Aberlour but that was their parental choice. These families do not benefit from
Council provided transport.
Resident – Moray Council has hostility, actions and attitude to rural schools
AH – We have not seen evidence of this. We have acknowledged that the Council
could done better at communicating the situation since mothballing – but since the
Learning Estate Team has been established the lessons learnt have been
addressed.
Resident – Has there been a Moray Quality audit since 2012.
SM – We undertake regular Quality Improvement Visits to schools undertaken by
link Quality Improvement Officers.  We currently use How Good is Our School?
Version 4 quality indicator framework where at that time, pre 2016/2017 we used
an older framework – How Good Is Our School? 3 which is not current.  Any
commentary made is now time-served based on education standards at that time. 
HMIe have also removed older pre-2016 Inspection Reports from their website for
this reason, showing only a moment in time based on staffing etc. at that time.  It
would not be possible to compare time-served reports and audits with current
status quo in schools, post-pandemic.  Learner views are central to our processes. 
We currently base our visits and evaluations on How Good is Our School version
4.
Resident – You are taking the heart out of the community there is a broader
philosophy to education.  I am shocked what is going on, this effects the
widespread community with other things closing the Hotel what next the shop?
Why in a number of weeks did the school role go from 10 to zero? Has there been
an investigation to quantity and quality of school staff.
JS – The consultation process will allow us to capture the feelings of the
community and parents.  We are new to the process and building a picture of what
has happened and ensuring that lessons learnt for the future. 
AH – Responses from parents at the time have not commented on issues of
quantity and quality of school staff impacting any decisions to move their children
out of school.  
Page 228

Page 229

MORAY COUNCIL LEARNING ESTATE PROGRAMME
Education, Communities & Organisational Development 
Deputy Lord Lieutenant – I am appalled at what has happened and will be
writing to the Chief Executive to ask for a full investigation, I appreciate that you
have inherited this but we need to know what happened.
Resident – The remote possibility that the school will re-open what will happen if it
is not fit for purpose.
AH – If the decision is to keep the school open it will be made fit for purpose.  This
will be dependent on parents establishing and interest to put their child to
Inveravon Primary.
Resident – The Head Teacher left and a temp in her place what happened.
SM – Staff leave for a number of reasons and this may include progression on to
new roles as experienced.  We cannot stop career development or staff desire to
move on but work to support schools where this may have happen with backfill
and appointment.  I know that schools may want to keep teachers they hold in
high regard but this is out with the local authority control and down to individual
teacher’s wishes.  We continue to support recruitment to posts and staff
professional development but at times have a limited supply available.
Resident – Rural Schools are on a knife edge regarding there viability
AH - Rural schools in Moray, as with many Local Authorities in Scotland pose a
challenge with a majority with falling rolls and increasing costs. However, the
School Act 2010 makes clear additional factors that should be applied and
considered when considering the closure of a rural school. These have been
applied during the options appraisal and detailed in the closure proposal for
Inveravon Primary School.
8 Close
Andy Hall thanked everyone for attending the meeting and the importance of
officers gaining feedback.  He encouraged everyone to participate fully in the
consultation and promoted the online survey, the Speyside High School meeting in
the evening and the online meeting the next day, 28th September, an invite to
which can be obtained by emailing the learning estate team.
Page 229

Page 230

Page 230

Page 231

MORAY COUNCIL LEARNING ESTATE PROGRAMME
Education, Communities & Organisational Development 
Appendix C
Public Consultation Meeting 
Closure of Inveravon Primary School
27 September 2022 at 7.00pm
In Person meeting at Speyside High School
Moray Council Officers present:
Jo Shirriffs, Head of Education Resources & Communities; Andy Hall, Programme
Manager (Learning Estate); Stewart McLauchlan, Quality improvement Manager;
Jane Martin Community Support Officer (Learning Estate)
HMI Inspector Present
Sheila Brown
Elected Members present:
None
Public attendance
2 members of the public also attended 
Apologies:
No apologies were received.
1. Welcome and Introductions
The members of public agreed not to continue with the presentation, however if
there should be any further attendees the meeting would proceed.  They
reiterated to officers there comments from the meeting at Inveravon Church in
the afternoon. 
2. Close
The meeting concluded at 8:00pm with not further attendees.
Item 16*
Page 231

Page 232

Page 232

Page 233

MORAY COUNCIL LEARNING ESTATE PROGRAMME
Education, Communities & Organisational Development 
Appendix D
Online Public Consultation Meeting 
Closure of Inveravon Primary School
28 September 2022 at 7pm 
Moray Council Officers present:
Andy Hall, Programme Manager (Learning Estate)
One member of the public (a local resident) attended the meeting
Apologies:
No apologies were received.
1. Welcome and Introductions
Andy Hall introduced himself and welcome the attendee to the meeting and laid out
the agenda for the meeting. He informed the attendee that written minutes would be
taken of the meeting and made public as part of the consultation. 
2. Consultation Overview
Andy Hall informed the attendee that the proposal currently under statutory
consultation is the closure of Inveravon Primary School.  The consultation proposes
to discontinue education at Inveravon School, which is currently mothballed and re-
assign its catchment area to other school(s) within the Speyside High School
Associated Support Group.
The consultation is in line with the School (Consultation) (Scotland) Act 2010.  The
2010 Act’s principal purpose is to provide strong, accountable statutory consultation
practices and procedures that local authorities must apply to their handling of all
proposals for school closures and other major changes to schools.  
The consultation will take into account:
• Any reasonable alternatives to the proposal;
• Specific requirements to be reviewed for a rural school;
• the likely educational benefits;
• the likely community impact; and,
• the likely effect of any different travelling arrangements.
These consultation processes are expected to be robust, open, transparent and fair,
and seen to be so.  The process runs Monday 29 August 2022 to Friday 7 October
2022.  
Item 16*
Page 233

Page 234

MORAY COUNCIL LEARNING ESTATE PROGRAMME
Education, Communities & Organisational Development 
3. Background
The decision to mothball Inveravon Primary School was taken as no pupils were
enrolled from August 2017. No children have attended Inveravon Primary School
since the end of session 2016/17, when the school was mothballed.  There have
been no parents chosen to enrol their children at Inveravon Primary School up to
and including the 2022/23 sessions.  The number of primary school children in
the Inveravon Primary School catchment totals 15 for the 2022/23 session and
these are attending either Knockando or Aberlour Primary School. 
A series of community engagements on the school took place in February and
March 2022 with online public meetings.  Comments boxes were left in key
locations in the Inveravon catchment area between February to August for the
general public to make comments. 
The outcome of the Options Appraisal was presented to the Education, Childcare
and Leisure Services Committee on 24 August 2022.  After deliberation a vote to
approve consultation on the closure of Inveravon School was taken. 
4. Options Considered
Andy Hall report that a number of alternatives to closure and a number of options
that involved closure were considered and the following were outlined at the
meeting:
Alternatives to Closure:
• to re-open Inveravon Primary School with its current catchment area
• to continue with the current “mothballing” arrangement
Proposed Options:
• Option 1 - Close Inveravon Primary School and rezone to Knockando
Primary School.  As per current mothball arrangement.  Transportation will
be provided by the council.  Parental option to out of school catchment,
transportation will not be funded
• Option 2 - Close Inveravon Primary School and split catchment between
Knockando and Aberlour Primary School.  Considers Maryhill catchment
shifting to Aberour School.  Council funded transportation provided to
Knockando and Aberlour schools within respective catchments.  Parental
option to request school out of catchment, transportation will not be provided.
• Option 3 - Close Inveravon Primary School and split catchment between
Knockando, Aberlour and Glenlivet primary schools.  Considers Maryhill
catchment shifting to Aberlour School and small are to Glenlivet, determined
by postcode.  Council funded transportation provided to Knockando, Aberlour
and Glenlivet within respective catchments.  Parental option for request
school out of catchment, transportation will not be funded.
Page 234

Page 235

MORAY COUNCIL LEARNING ESTATE PROGRAMME
Education, Communities & Organisational Development 
Discounted Options:
• Option 4 - Close Inveravon Primary School and rezone with Aberlour Primary
School
• Option 5 - Close Inveravon Primary School and rezone with Glenlivet Primary
School
Andy Hall stressed that it is important in considering the proposed options that
they did not have adversely impact any children currently attending the schools
affected by this proposal and continuity in their education was paramount. He
stated that whichever decision is taken, all existing pupils will not be required to
change their school. This will also apply to any younger siblings of those pupils,
provided they remain at the same primary school.
5. Questions from the floor
Andy Hall opened the session for questions:
Resident: In the event of closure could the school be considered for use as an
outward-bound centre similar to Nethy Bridge?
Andy Hall: If the school were to closure the land and the buildings on it would be
handed back to the Ballindalloch who had gifted the land in early 19th century to
the then community council as per the land deed agreement so the Council are
not in a position to change use; however, community ideas on how the building
and land could be used would be forward to the Ballindalloch Estate for their
considerations. This idea would be added to this list.
Resident: Could the building be kept open by the Council turned into a local
nursery? 
Andy Hall: The idea had been discussed with ELC colleagues but the focus on
their investment was in the current ELC facilities within Aberlour.
Resident: Could the building be kept open and refurbished as an Additional
Support Needs (ASN) centre?
Andy Hall: Moray Council policy is that we endeavour that Additional Support
Needs for children and young people should be delivered in a mainstream
school. Aberlour Primary School has the Primary Enhanced Provision base for
children with Additional Support Needs for the Speyside Associated Schools
Group.  Most children attend for part of the time, also attending mainstream
classes. Knockando and Glenlivet Primary School class teachers support all
children where required with support assistant input for targeted need. There is
no identified requirement for additional capacity and therefore no justified
investment.
Further general discussions on the Moray Learning Estate strategy took place for
the remainder of the session.
6. Next Steps
On conclusion of questions Andy Hall outlined the next steps in the process:
Page 235

Page 236

MORAY COUNCIL LEARNING ESTATE PROGRAMME
Education, Communities & Organisational Development 
• Phase 2 - Consultation (concludes 7 October 2022)
• Phase 3 – on submission of consultation and other documentation 
Education Scotland will prepare report on the educational aspects of the
proposal (3 weeks)
➢ HMI visit 25/26 October
➢ Meetings at schools/parental sessions
• Phase 4 – Preparation and publication of consultation report
• Phase 5 – Decision process
➢ 25 January 2023 - Recommendation to Education, Childcare
and Leisure Services Committee
➢ 1 March 2023 - Recommendation to and decision at Full
Council
➢ If closure decision:
Authority must notify Scottish Ministers with 6 working days
Publish notice on website
7. Close
Andy Hall closed the meeting by emphasising that it is important the Council gain
feedback regarding the meeting and the proposal and encouraged further
comment and/or feedback via the online survey or direct email to the Learning
Estates Team. 
Andy Hall closed the meeting at 7:40pm  
Page 236

Page 237

MORAY COUNCIL LEARNING ESTATE PROGRAMME
Education, Communities & Organisational Development 
If a Closure Decision
• Phase 6 – Ministerial call in
➢ Initial 3 weeks from notification of decision anyone can make representation
to Ministers
➢ Further 5 weeks for Ministers to decide whether or not to issue a call-in
notice
➢ During 8 week period the Authority cannot proceed to implement proposed
closure
• Phase 7 – School Closure Review Panel
➢ If Ministers call in
➢ Max 9 to 17 weeks
If a Non-closure Decision
• Phase 8 – Restriction on school closure for 5 years 
8. Close
Andrew Hall thanked everyone for attending the meeting and the importance of
officers gaining feedback.  He encouraged everyone to participate fully in the
consultation and promoted the online survey, the Speyside High School meeting in
the evening and the online meeting the next day ,28th September, an invite to
which can be obtained by emailing the learning estate team.
Page 237

Page 238

Page 238

Page 239

Inveravon Primary School Closure Proposal
Parental Feedback (Pre Consultation and Consultation) 
APPENDIX E 
Comment/Suggestion 
Pre-consultation (December 2021- March 2022)
1 Email – Parent (Inveravon Catchment)
Whilst it would be lovely for our █to attend school much closer to home than
Knockando, I strongly feel that the quality of █ social and academic
education should come first. Unless the school roll can be reliably and
consistently at a level to facilitate age appropriate group learning and play
activities then I would not support the reopening of Inveravon Primary. By
this, I'm not an expert, but I would be thinking in the order of 25+ pupils.
There is so much to be gained in the social interactions and the things that
are possible with the increased numbers at the combined provision, but for
current skills development and in preparation for high school and beyond. 
A number of years ago there was suggestion of a new build combined school
for Knockando, Inveravon and Glenlivet at a site in Marypark. This would
have been excellent. 
I am very happy with the calibre of teaching and support at Knockando, but
modern facilities (and space!) would really benefit all the pupils. 
Whatever decision is made it must be one that is in the best interests of
current and future pupils. 
I am well aware personally and professionally of the implications in regard to
transport etc., but do not find these unresolvable. 
There are of course wider community benefits that come from having a
school facility in a rural community, but these should not overshadow the
main function of the building. 
2 Survey – Parent (Inveravon Catchment)
Children at Knockando their whole school life.  Another starting in August.  If
they went to Inveravon they would be in class by themselves which would be
unsettling for the child. 
3 Survey – Parent (Inveravon Catchment)
Close it, sell it! 
4 Survey – Parent (Inveravon Catchment)
As a parent of 2 school aged children, I feel Inveravon needs closed
completely, ASAP. My children are very happy attending Knockando Primary
School and I would not be moving then under any circumstances.
It also seems unfair that Knockando Primary cannot have a permanent Heat
Teacher until this is resolved. 
5 Survey – Parent (Inveravon Catchment)
We feel Inveravon Primary should be closed and financial & staff resources
should be consolidated to provide a modern equipped resource for the wider
area. 
6 Survey – Parent (Inveravon Catchment)
I think Moray Council needs to fully close Inveravon as it is just wasting money
which could be used to improve education elsewhere in the area.  There will never
Item 16*
Page 239

Page 240

Inveravon Primary School Closure Proposal
Parental Feedback (Pre Consultation and Consultation) 
be enough children to deem the school fit to be open so it needs to be closed not
mothballed.
7 Survey – Parent (Inveravon Catchment)
We are delighted with the education provision at Knockando Primary school.  Our
children love going to School and feel part of the school community.  In the event of
Inveravon primary School closing, we would hope that our children continue to be
zoned to Knockando primary School. 
Consultation (August 2022 to 7 October 2022)
8 Knockando Parent/Carer (Inveravon Catchment)
We are only temporary residents to the area so feel we can’t formerly
comment.  However, having attended Inveravon Primary myself as a child
and now seeing my children currently attend Knocked Primary I feel the
recourses are/can be better used by moving them fully to Knockando. I feel
the school at Knockando is very well run (in our experience) and being part
of a slightly larger school community with access to better resources is far
more beneficial for our children.  Families have the option of applying to
Aberlour and Glenlivet also which again fields resources/funding to
established learning communities. 
Rural schools are very important but in this case our family feels there are
better opportunities at other schools which would be further enhanced if
funding was not re-directed into re-opening Inveravon and rather put towards
the other “rural” schools still open in the area. 
I have very fond memories of my time at Inveravon but in this current age,
this school is no longer sustainable in my opinion.
9 Knockando Parent/Carer (Inveravon Catchment)
We are delighted with the education provision at Knockando Primary School. 
Our children love going to school and feel part of the school community.  In
the event of Inveravon Primary School closing, we would hope that our
children continue to be zoned to Knockando Primary School. 
Page 240

Page 241

Appendix F
Inveravon Primary School Closure
Aberlour Primary School Pupil Engagement
• Do you think Inveravon Primary School should re-open? Why?  
P1-2 If some people went to Inveravon then there would be less people at
other schools. 
It make more children learn 
People wouldn’t have to drive so far then they could go to that school
(Inveravon). 
New children can go to the school, get invited, and get a new teacher.  
P2-3 It’s the closest school to me it has nature around it that I like 
It would cost less in fuel if the people could walk there 
Some people might live really close and it would be easier to get there.  
P4-5 No pupils have heard of the school  
P5-6 Yes – because some children may need to go to there if there are no
room elsewhere. 
Lots of children like there and not school nearby 
Aberlour to far – long journey for parents, expensive at the moment. 
Children’s rights – right to education so the school should reopen. 
Fuel prices going up – to expensive.  
P6-7 I don’t know where Inveravon school is or what it is – 17 responses 
Not bothered about it 
Yes - 1 response 
No – everyone is happy in their new schools.  
ASN Not able to comment  
• If Inveravon Primary School did re-open, would you like to go there?
Why?  
P1-2 Yes – could do lots of fun activities 
Lots of art there 
Not sure   
No – it might have a smaller playground 
Picked up by anyone 
Not as fun things as here (Aberlour) 
Games would be different 
Classrooms smaller 
Friends different
Item 16*
Page 241

Page 242

P2-3 Because it is closer to me  
P4-5 No responses  
P5-6  Yes - It’s the closest school to my house, would like a change, but would
miss friends. 
No – Mostly  
P6-7 No – want to stay at Aberlour 
I should have gone to that school but I live sometimes in Aberlour with
Dad and Mum works in Aberlour  
ASN Not able to comment  
• What do you like about your current school?  What would be different
if you had to go to Inveravon Primary School?  
P1-2 Likes about Aberlour Primary School 
Teachers 
Do PE in a big playground 
Playing 
I like the writing we do 
I like focussing on my task 
Like the toys 
The homework 
What would be different 
Food 
Different tables (colours) 
Not nice teachers 
The hallways 
Toys 
Would be as kind  
P2-3 Like about Aberlour Primary 
Playing with friends 
Kind teachers 
If I’m not feeling well my house is not far away 
I like the classrooms and all the stuff on the walls 
Wonderful people 
I love the garden 
I like the work  
P4-5 What we like at current school 
Doing science, reading, learning maths, PE, nice teachers who are fun,
grammar, ICT with Mrs Griffiths, art  
Page 242

Page 243

P5-6 Lots of friends and good food 
Teachers are nice here 
Nice classrooms, colourful 
Like how teachers are caring – handle my allergy 
Wouldn’t have friends at new school, everything would be different. 
Wouldn’t know anyone/teachers 
Don’t know routines of a new school  
P6-7 Big playground and playground equipment, garden, teaches and pupils
are nice, lots of people in the school so lots of friends, lots of
opportunities and activities. 
The school is financially stable 
People are treated equally 
Covid masks are no longer needed 
Different class combinations and composites. 
It has heating 
Don’t know what would be different. 
People could use Inveravon for something else – farmers market,
community hall.  
ASN Not able to comment.  
Glenlivet Primary School Pupil Engagement – P1-7 (13 pupils present)
• Do you think Inveravon Primary School should re-open? Why?  
P1-7 There are 13 children in school today, 5 children knew where Inveravon
Primary School is 
10 out of 13 thought the school should re-open 
P7 pupil said, “Maybe more families will move into the area. It would be
hard for them without a school nearby. 
P6 pupil said, “I think it should reopen so that the children can go to the
same school as their friends.” 
P6 pupil said, “I think it should reopen so that the children can go to the
same school as their friends.”  
• If Inveravon Primary School did re-open, would you like to go there?
Why?  
P1-7 No one wanted to go to Inveravon if it reopened 
One P6 children said, “It might be a good school, but we don’t know.”  
• What do you like about your current school?  What would be different
if you had to go to Inveravon Primary School?  
P1-7 These are the comments from the class about their school
Page 243

Page 244

Friendly children and staff, I like all the people, everyone is nice to each
other 
Good teachers 
Maths lessons 
Colourful environment inside and outside 
I like everything 
I like the playground and the playground equipment. 
I like the variety of ways you can achieve in school 
My teacher makes learning fun 
There are lots of active outdoor activities to do, for example walks,
gardening and Woodland Wednesdays.  
Knockando Primary School Pupil Engagement – All responses collated here
• Do you think Inveravon Primary School should re-open? Why?  
P1-7 21/37 possible said ‘Yes’ it should re-open but most of these couldn’t
give a reason why and only 2 are zoned for Inveravon 
‘I remember it being a nice school in P1.’ P7 Former pupil, no longer 
‘I remember it was a nice school for visiting.’ P7 pupil, Archiestown 
My friends Mum used to work there.’, P5 pupil, Carron  
• If Inveravon Primary School did re-open, would you like to go there?
Why?  
P1-7 8/37 pupils said they would like to go there. Of these 5 are zoned for
Inveravon 
Smaller school and more space (Ballindalloch) 
Nice school (Ballindalloch) 
I’ve been to different schools and I like going to different schools as
more chance of seeing a friend at the park. (Carron) 
An older sibling went there (Ballindalloch) 
Nearer to home (Ballindalloch)  
• What do you like about your current school?  What would be different
if you had to go to Inveravon Primary School?  
P1-7 What do you like about your current school? 
The outdoor space and playground, monkey bars (Archiestown) 
The size – small number of pupils (Ballindalloch) 
All my friends are at Knockando (Ballindalloch) 
I’ve been here a long time and I’m settled here (Knockando) 
All the staff and pupils are really nice and kind (Archiestown) 
At Knockando there are children from different communities together
(Ballindalloch) 
It’s not too crowded with 3 classes, good size (Ballindalloch)
Page 244

Page 245

It’s welcoming (Archiestown) 
There are lots of active outdoor activities to do, for example walks,
gardening and Woodland Wednesdays. 
Teachers and staff are nice (Archiestown)  
P1-7 What would be different if you had to go to Inveravon Primary School? 
Different staff and routines (Ballindalloch) 
Would need to make new friends (Ballindalloch) 
There’d be only one class (Knockando) 
Less green space (Knockando) 
Teachers would be different (Carron) 
Don’t know if people would like me (Ballindalloch) 
Page 245

Page 246

Page 246

Page 247

* Q3: If you are a parent/carer, member of the community or staff member, do you have a primary aged pupil or younger child affected by the changes to
Inveravon Primary School in your family? 
Appendix G 
Inveravon Primary School consultation
Online survey responses report 
ID Q1: Do you
live in:
Q2: Are you
a:
Q3: Do
you have
a child
affected
by the
changes?
*
Q4: Are
you
currently
a pupil at
a Moray
school?
Q5: Which
school?
Q6: Which
option do
you prefer
for the
proposed
school
catchment
area?
Q7:Do you
support
the closure
of
Inveravon
Primary
School
Comments Q8: Do you
think any of
the options
should be
discounted?
If so, please
indicate
which ones.
Q9: Please state
your reasons why
you think this
option should be
discounted.
Q10: Please
provide any other
comments.
1 Aberlour Parent/carer No Yes Aberlour Option 3 Yes  No
preference
Not answered Not answered
2 Aberlour Parent/carer Yes No Not
answered
Option 1 No I don't support the
closure of any school
Option 3 The children
should be kept
together if
relocated and not
split up.
Not answered
3 Knockando Parent/carer Yes No Not
answered
Option 1 Yes  No
preference
Not answered Not answered
4 Aberlour Parent/carer No No Not
answered
No
preference
Yes  No
preference
Not answered Not answered
5 Knockando Parent/carer Yes No Not
answered
Option 3 No  Option 1,2,3 N/A N/A
6 Inveravon Parent/carer Yes Yes Knockando Option 1 Yes  No
preference
Not answered Not answered
7 Inveravon Community
member
No No Not
answered
Option 3 No It would seem better to
keep mothballed in case
the potential pupil
numbers increase in the
next decade.
No
preference
Not answered Not answered
8 Aberlour Community
member
N/A No Not
answered
Option 3 Yes  No
preference
Not answered Not answered
9 Inveravon Parent/carer Yes No Not
answered
Not
answered
Not
answered 
Not
answered
Not answered Not answered
Item 16*
Page 247

Page 248

* Q3: If you are a parent/carer, member of the community or staff member, do you have a primary aged pupil or younger child affected by the changes to
Inveravon Primary School in your family? 
ID Q1: Do you
live in:
Q2: Are you
a:
Q3: Do
you have
a child
affected
by the
changes?
*
Q4: Are
you
currently
a pupil at
a Moray
school?
Q5: Which
school?
Q6: Which
option do
you prefer
for the
proposed
school
catchment
area?
Q7:Do you
support
the closure
of
Inveravon
Primary
School
Comments Q8: Do you
think any of
the options
should be
discounted?
If so, please
indicate
which ones.
Q9: Please state
your reasons why
you think this
option should be
discounted.
Q10: Please
provide any other
comments.
10 Inveravon Community
member
No No Not
answered
No
preference
No  No
preference
No preference Parents should be
allowed to
choose which
schools they put
their child to if in
Inveravon area -
whether that be
Glenlivet,
Knockando or
Aberlour - they
should not be
restricted and
should have the
option of the 3
schools.
11 Knockando Parent/carer Yes No Not
answered
Option 1 Yes  Option 2
and 3
Knockando is a
great size of school
and within a good
distance of our
home. My children
are settled in
Knockando and I
would not relocate
them to another
school.
Not answered
12 Glenlivet Community
member
N/A No Not
answered
Option 3 Yes  No
preference
Not answered Not answered
13 Aberlour Community
member
No No Not
answered
Not
answered
Not
answered 
Not
answered
Not answered Not answered
Page 248

Page 249

* Q3: If you are a parent/carer, member of the community or staff member, do you have a primary aged pupil or younger child affected by the changes to
Inveravon Primary School in your family? 
ID Q1: Do you
live in:
Q2: Are you
a:
Q3: Do
you have
a child
affected
by the
changes?
*
Q4: Are
you
currently
a pupil at
a Moray
school?
Q5: Which
school?
Q6: Which
option do
you prefer
for the
proposed
school
catchment
area?
Q7:Do you
support
the closure
of
Inveravon
Primary
School
Comments Q8: Do you
think any of
the options
should be
discounted?
If so, please
indicate
which ones.
Q9: Please state
your reasons why
you think this
option should be
discounted.
Q10: Please
provide any other
comments.
14 Glenlivet Community
member
No No Not
answered
Not
answered
Not
answered 
Not
answered
Not answered Not answered
15 Glenlivet Parent/carer
&
community
member
No No Not
answered
Option 3 No  No
preference
Not answered Not answered
16 Inveravon Community
member
No No Not
answered
Option 2 No It is a tragedy for the
Ballindalloch community
that Inveravon Primary
school has effectively
been closed already.
Such a school is the
centre of the community
and now we no longer
have it. I very much hope
that the lessons of the
past 5 years have been
understood by the
Moray Council and that
lessons will be learnt for
the future.
Option 3 It seems totally
irrelevant, the area
concerned appears
to be a bit of hill
side.
Until the reasons
for the pupil roll
at Inveravon
dropping so
suddenly within a
3-week period
are admitted,
analysed and
assessed, it
seems that
lessons cannot be
learnt about how
to keep our
current rural
primary schools.
17 Aberlour Parent/carer Yes No Not
answered
Option 3 No See commenti Option 3 See comment ii See comment iii
18 Knockando Parent/carer Yes Yes Knockando Option 1 Yes  Option 2
and 3
Knockando
Primary benefits
from the larger
numbers and has
the capacity.
Children from
Inveravon would
have an overalll
safer journey to
school by taking
the quieter road
to Knockando.
Page 249

Page 250

* Q3: If you are a parent/carer, member of the community or staff member, do you have a primary aged pupil or younger child affected by the changes to
Inveravon Primary School in your family? 
ID Q1: Do you
live in:
Q2: Are you
a:
Q3: Do
you have
a child
affected
by the
changes?
*
Q4: Are
you
currently
a pupil at
a Moray
school?
Q5: Which
school?
Q6: Which
option do
you prefer
for the
proposed
school
catchment
area?
Q7:Do you
support
the closure
of
Inveravon
Primary
School
Comments Q8: Do you
think any of
the options
should be
discounted?
If so, please
indicate
which ones.
Q9: Please state
your reasons why
you think this
option should be
discounted.
Q10: Please
provide any other
comments.
19 Inveravon Community
organisation
N/A No Not
answered
Option 3 No As a scattered rural
parish, the school was
the essentialcentre of
the community without
this key establishment
thelikelihood of the area
supporting or attracting
young familiesto live is
drastically reduced.
Option 1,2,3 Inveravon is a joint
parish with
Glenlivet in
community and
association terms.
The rezoning to
Knockando and
Aberlour means
that the children
will not meet
others in their own
community
(except on a bus)
and due to the
distance from their
homes after-
school activities
would be difficult
to say the least.
The road to
Knockando from
Inveravon can be
extremely
hazardous in
winter with
drifting snow due
to its exposure,
whereas the road
to Glenlivet is a B
road and kept
reasonably clear.
The whole
process of
mothballing has
been very painful.
The schools
outside
equipment was
removed within
months of the
decision to
mothball as were
most of the
teaching aids. The
building and
grounds have
been completely
neglected - a sad
reflection on
Moray Council.
Page 250

Page 251

* Q3: If you are a parent/carer, member of the community or staff member, do you have a primary aged pupil or younger child affected by the changes to
Inveravon Primary School in your family? 
ID Q1: Do you
live in:
Q2: Are you
a:
Q3: Do
you have
a child
affected
by the
changes?
*
Q4: Are
you
currently
a pupil at
a Moray
school?
Q5: Which
school?
Q6: Which
option do
you prefer
for the
proposed
school
catchment
area?
Q7:Do you
support
the closure
of
Inveravon
Primary
School
Comments Q8: Do you
think any of
the options
should be
discounted?
If so, please
indicate
which ones.
Q9: Please state
your reasons why
you think this
option should be
discounted.
Q10: Please
provide any other
comments.
20 Inveravon Community
member
No Not
answered
Not
answered
Not
answered
Not
answered 
Not
answered
Not answered Not answered
21 Glenlivet Other -
granparents
N/A No Not
answered
Option 3 No  Option 1,2,3 Not enough choice Not answered
22 Inveravon Community
member
NA No Not
answered
No
preference
No School should be
maintained and used as a
community resource
No
preference
Not answered As said above, the
school should be
maintained and
kept as a
community
resoutrce, with a
view perhaps to
re-opening as a
school if the
young population
increases, but if
not as a
workshops,
meeting centre.
Page 251

Page 252

* Q3: If you are a parent/carer, member of the community or staff member, do you have a primary aged pupil or younger child affected by the changes to
Inveravon Primary School in your family? 
ID Q1: Do you
live in:
Q2: Are you
a:
Q3: Do
you have
a child
affected
by the
changes?
*
Q4: Are
you
currently
a pupil at
a Moray
school?
Q5: Which
school?
Q6: Which
option do
you prefer
for the
proposed
school
catchment
area?
Q7:Do you
support
the closure
of
Inveravon
Primary
School
Comments Q8: Do you
think any of
the options
should be
discounted?
If so, please
indicate
which ones.
Q9: Please state
your reasons why
you think this
option should be
discounted.
Q10: Please
provide any other
comments.
23 Aberlour Other -
grandparent
N/A No Not
answered
No
preference
No Moray Council lied.
Parents had been told by
them that the school was
closing in August. That is
why 'no pupils attended
in August 2017'. Am
disgusted by the
pretence by the Council
that the decision to close
Is based on parents
taking their children
away resulting in there
being no roll in August
2017. Moray Council is
only too aware of why
there were no pupils: it
was because the parents
were given no choice.
Am angry and distressed
by the closure of this
rural school. It had an
exemplary track record,
provided an outstanding
educational experience
for the children and was
at the very centre of the
community which will be
devastated by its closure.
But you know all this.
Shame on you, Moray
Council.
No Not answered There is no point.
I attended the
consultation
meetings. I said
my piece - as
many others have
and much more
eloquently than I.
It just saddens me
that our collective
voice will be
ignored. You
know what you
are going to do.
Tell yourself
whatever you
need to keep
your job and to
feel no guilt or
shame for lying.
Page 252

Page 253

* Q3: If you are a parent/carer, member of the community or staff member, do you have a primary aged pupil or younger child affected by the changes to
Inveravon Primary School in your family? 
ID Q1: Do you
live in:
Q2: Are you
a:
Q3: Do
you have
a child
affected
by the
changes?
*
Q4: Are
you
currently
a pupil at
a Moray
school?
Q5: Which
school?
Q6: Which
option do
you prefer
for the
proposed
school
catchment
area?
Q7:Do you
support
the closure
of
Inveravon
Primary
School
Comments Q8: Do you
think any of
the options
should be
discounted?
If so, please
indicate
which ones.
Q9: Please state
your reasons why
you think this
option should be
discounted.
Q10: Please
provide any other
comments.
24 Inveravon Parent/carer Yes No Not
answered
Option 1 Yes  Option 3 I would not like to
send my children
to Glenlivet
Primary School 
25 Inveravon Parent/carer Yes No Not
answered
Option 1 Yes School unsuitable due to
small numbers
Option 3 I don't think
Glenlivet Primary
will be sustainable
in the future.
I am very happy
with the size of
school and
interaction at
Knockando
Primary. Both my
children attend
the school and
with some
investment in
indoor sports
space, the school
would be perfect.
26 Inveravon Community
member
N/A No Not
answered
Option 3 No If Moray Council has
shown due commitment
to an excellent school, it
would never have
imploded.
Option 1
and 2
Glenlivet needs an
enlarged
catchment area if
it is to be
sustainable.
Glenlivet/Inveravo
n is an established
community.
If Inveravon
catchment
children do not
go to Glenlivet
then Glenlivet will
be next on Moray
Council's target
list for closure -
this must not
happen.
27 Inveravon Community
member
No No Not
answered
No
preference
No  No
preference
Not answered Not answered
Page 253

Page 254

* Q3: If you are a parent/carer, member of the community or staff member, do you have a primary aged pupil or younger child affected by the changes to
Inveravon Primary School in your family? 
ID Q1: Do you
live in:
Q2: Are you
a:
Q3: Do
you have
a child
affected
by the
changes?
*
Q4: Are
you
currently
a pupil at
a Moray
school?
Q5: Which
school?
Q6: Which
option do
you prefer
for the
proposed
school
catchment
area?
Q7:Do you
support
the closure
of
Inveravon
Primary
School
Comments Q8: Do you
think any of
the options
should be
discounted?
If so, please
indicate
which ones.
Q9: Please state
your reasons why
you think this
option should be
discounted.
Q10: Please
provide any other
comments.
28 Glenlivet Parent/carer No No Not
answered
Option 3 Yes I understand the building
is in disrepair and can't
be fixed but I believe
more of the catchment
should be sent to
Glenlivet as closer and
increases school roll
there.
Option 1
and 2
Pupils should go to
Glenlivet
Not answered
29 Glenlivet Parent/carer No Yes Glenlivet Option 3 Yes If it is currently not in
use.
Option 1
and 2
The fairest way to
ensure the
sustainability of
the smaller schools
such as Glenlivet
would be for an
even split
regarding
catchment areas.
Also Glenlivet is
the closest to
Inveravon and so
surely from a
geographical
concept pupils and
families would
benefit from
Glenlivet being
included option 3
Glenlivet
currently is
deemed to be a
very good school
achieving good
results. Allegedly
if numbers fall
below 15 then
this school will
also come under
scrutiny for
closer. Aberlour
and Knockando
are some way
away from the
Glenlivet
catchment area
Page 254

Page 255

* Q3: If you are a parent/carer, member of the community or staff member, do you have a primary aged pupil or younger child affected by the changes to
Inveravon Primary School in your family? 
ID Q1: Do you
live in:
Q2: Are you
a:
Q3: Do
you have
a child
affected
by the
changes?
*
Q4: Are
you
currently
a pupil at
a Moray
school?
Q5: Which
school?
Q6: Which
option do
you prefer
for the
proposed
school
catchment
area?
Q7:Do you
support
the closure
of
Inveravon
Primary
School
Comments Q8: Do you
think any of
the options
should be
discounted?
If so, please
indicate
which ones.
Q9: Please state
your reasons why
you think this
option should be
discounted.
Q10: Please
provide any other
comments.
30 Glenlivet Parent/carer No No Not
answered
Option 3 Yes  Option 1 No practical for all
families and
prevents
representative
schools
Not answered
31 Glenlivet Parent/carer No No Not
answered
Option 3 No  No
preference
N/A The closure of
rural primary
schools
contributes to the
depopulation of
rural areas and
further reduction
in rural services. I
understand the
financial
constraints, but I
do not believe
this is helpful for
revitalising rural
areas.
32 Inveravon Community
organisation
Yes Yes Not
answered
Not
answered
Not
answered 
Not
answered
Not answered Not answered
33 Aberlour Parent/carer
staff
member
No No Not
answered
Not
answered
Not
answered 
Not
answered
Not answered Not answered 
Legend: 
Option 1 - Close Inveravon Primary School and rezone to Knockando Primary School.
Page 255

Page 256

* Q3: If you are a parent/carer, member of the community or staff member, do you have a primary aged pupil or younger child affected by the changes to
Inveravon Primary School in your family? 
Option 2 - Close Inveravon Primary School and split catchment between Knockando and Aberlour Primary School.
Option 3 - Close Inveravon Primary School and split catchment between Knockando, Aberlour and Glenlivet primary schools. 
i Inveravon: An Exceptional School. My daughter (name of child redacted) attended Inveravon until its closure in 2017. This was a blow to both her and I for several reasons. (Name of child
redacted) had previously attended Craigellachie Primary for her 1st year at school. Once she started at Inveravon in Primary 2 it became apparent that this school was a cut above the rest.
(Redacted)'s reading, comprehension, maths and overall confidence and interpersonal skills with her peers excelled tenfold within a very short time of starting Inveravon. I could not believe
the difference in her and I put this down to the approach that their amazing staff had towards education and development. Children were encouraged to help and/or learn alongside peers
out with their 'age group' and it was a regular occurrence that, providing all class work was completed, children were then taken outside to explore gardening, STEM and physical activities
to really enhance and compliment the learning they had in the classroom. The standard held at Inveravon was second to none and if this school was to reopen (or had it stayed open) I
would have been incredibly excited to send my now 2yr old when she is ready to begin her primary education. Inveravon primary was not just a school however, it was a community hub.
Classes for locals were held there and fundraising activities run by the school were always a hit. I had never felt so at home, so welcome or such a part of a community than when Inveravon
was open. The spirit of the local community definitely dampened when the school was no longer open. I would like to share my experience regarding the ""mothballing"" of Inveravon.
There were FOUR children in attendance at Inveravon when we were issued notice that the school would no longer be open after the summer holidays. We, as parents, had no other choice
to enrol our children in another school. It may seem there were 'no children' on the roll as it was mothballed but I can assure you, we would not have moved our children to Knockando (or
other schools) had we been given the choice. There was no choice. My daughter returned to Craigellachie Primary so as not to disturb her too much. If I had had the choice, she would have
stayed at Inveravon. A short time after the 'mothballing' we learned that structures around the school had been demolished. This was extremely upsetting to hear as these were community
funded assets, paid for with funds from parents and locals who had fundraised so the children could have an enriched and quality education. I do not believe that Inveravon was closed (read
mothballed) due to a lack of quality education and the outcomes of said education. I believe it was purely down to money. Unfortunately, this stripped an already small, isolated, rural
community of one of its most attractive assets. 
ii Inveravon: An Exceptional School. My daughter (name of child redacted) attended Inveravon until its closure in 2017. This was a blow to both her and I for several reasons. (Name of child
redacted) had previously attended Craigellachie Primary for her 1st year at school. Once she started at Inveravon in Primary 2 it became apparent that this school was a cut above the rest.
(Redacted)'s reading, comprehension, maths and overall confidence and interpersonal skills with her peers excelled tenfold within a very short time of starting Inveravon. I could not believe
the difference in her and I put this down to the approach that their amazing staff had towards education and development. Children were encouraged to help and/or learn alongside peers
out with their 'age group' and it was a regular occurrence that, providing all class work was completed, children were then taken outside to explore gardening, STEM and physical activities
to really enhance and compliment the learning they had in the classroom. The standard held at Inveravon was second to none and if this school was to reopen (or had it stayed open) I
would have been incredibly excited to send my now 2yr old when she is ready to begin her primary education. Inveravon primary was not just a school however, it was a community hub.
Classes for locals were held there and fundraising activities run by the school were always a hit. I had never felt so at home, so welcome or such a part of a community than when Inveravon
was open. The spirit of the local community definitely dampened when the school was no longer open. I would like to share my experience regarding the ""mothballing"" of Inveravon.
There were FOUR children in attendance at Inveravon when we were issued notice that the school would no longer be open after the summer holidays. We, as parents, had no other choice
to enrol our children in another school. It may seem there were 'no children' on the roll as it was mothballed but I can assure you, we would not have moved our children to Knockando (or
other schools) had we been given the choice. There was no choice. My daughter returned to Craigellachie Primary so as not to disturb her too much. If I had had the choice, she would have
stayed at Inveravon. A short time after the 'mothballing' we learned that structures around the school had been demolished. This was extremely upsetting to hear as these were community
funded assets, paid for with funds from parents and locals who had fundraised so the children could have an enriched and quality education. I do not believe that Inveravon was closed (read
mothballed) due to a lack of quality education and the outcomes of said education. I believe it was purely down to money. Unfortunately, this stripped an already small, isolated, rural
community of one of its most attractive assets. 
Page 256

Page 257

* Q3: If you are a parent/carer, member of the community or staff member, do you have a primary aged pupil or younger child affected by the changes to
Inveravon Primary School in your family? 
iii Inveravon: An Exceptional School. My daughter (name of child redacted) attended Inveravon until its closure in 2017. This was a blow to both her and I for several reasons. (Name of child
redacted) had previously attended Craigellachie Primary for her 1st year at school. Once she started at Inveravon in Primary 2 it became apparent that this school was a cut above the rest.
(Redacted)'s reading, comprehension, maths and overall confidence and interpersonal skills with her peers excelled tenfold within a very short time of starting Inveravon. I could not believe
the difference in her and I put this down to the approach that their amazing staff had towards education and development. Children were encouraged to help and/or learn alongside peers
out with their 'age group' and it was a regular occurrence that, providing all class work was completed, children were then taken outside to explore gardening, STEM and physical activities
to really enhance and compliment the learning they had in the classroom. The standard held at Inveravon was second to none and if this school was to reopen (or had it stayed open) I
would have been incredibly excited to send my now 2yr old when she is ready to begin her primary education. Inveravon primary was not just a school however, it was a community hub.
Classes for locals were held there and fundraising activities run by the school were always a hit. I had never felt so at home, so welcome or such a part of a community than when Inveravon
was open. The spirit of the local community definitely dampened when the school was no longer open. I would like to share my experience regarding the ""mothballing"" of Inveravon.
There were FOUR children in attendance at Inveravon when we were issued notice that the school would no longer be open after the summer holidays. We, as parents, had no other choice
to enrol our children in another school. It may seem there were 'no children' on the roll as it was mothballed but I can assure you, we would not have moved our children to Knockando (or
other schools) had we been given the choice. There was no choice. My daughter returned to Craigellachie Primary so as not to disturb her too much. If I had had the choice, she would have
stayed at Inveravon. A short time after the 'mothballing' we learned that structures around the school had been demolished. This was extremely upsetting to hear as these were community
funded assets, paid for with funds from parents and locals who had fundraised so the children could have an enriched and quality education. I do not believe that Inveravon was closed (read
mothballed) due to a lack of quality education and the outcomes of said education. I believe it was purely down to money. Unfortunately, this stripped an already small, isolated, rural
community of one of its most attractive assets.
Page 257

Page 258

Page 258

Page 259

1
Closure of Inveravon School consultation report 
Appendix H 
Inveravon School propose closure consultation
Online survey data report
Introduction 
As part of the statutory consultation regarding the closure of Inveravon School,
stakeholders were invited to participate in an online survey to express their opinion
on the proposal. 
The survey was open from 29 August 2022 until 07 October 2022. In total, 33 survey
responses were submitted – 32 were completed online and one printed copy was
received. 
The survey data is presented in this. The survey responses are published in
Appendix ?. 
Summary of responses 
• 33 people responded.
• 13 people are from the Inveravon Primary School catchment; 8 from Aberlour
catchment; 8 from Glenlivet catchment; 4 from Knockando catchment.
• 18 are parents/carers; 12 community members; 2 community organisations; 1
staff member; 2 other family members. Some people identify as being in more
than one stakeholder group.
• 11 have a primary aged pupil or younger child affected by the changes to
Inveravon Primary School in your family
• Option 3 (split catchment between Knockando, Aberlour and Glenlivet primary
schools) was preferred by 14 out of 27 people.
• 13 people support the proposed closure of Inveravon Primary School and 14
are against the proposal. 6 people did not answer this question.
• Support for closure is strongest among parents/carers, with 11 out of 16 in
favour. 
Item 16*
Page 259

Page 260

2
Closure of Inveravon School consultation report 
Survey questions and responses
Question 1 - Do you live in (choose any one option). You can check your
catchment area using the map above or by inserting your postcode into the
interactive map on our website by clicking here. (33 responses) 
Chart 1 shows that 13 (40%) people live within the Inveravon Primary School
catchment area, and 8 (24%) within the Glenlivet Primary School catchment area
and the same within the Aberlour Primary School catchment area. 4 live in the
Knockando Primary School catchment area. 
Comments:
• I live in Highland, just out of Inveravon Primary School catchment. I teach at
Aberlour Primary School.
• Dufftown - because Inveravon was closed. 
Question 2 – Are you a parent/carer, pupil, community member, community
organisation or staff member? (33 responses) 
Chart 2 shows that 18 people identified as parents/carers, 12 as members of the
community, 2 as members of community organisations, 1 as a staff member and 2
indicated other, adding the additional comment that they were grandparents. Two
people selected more than one answer. No one identified as a pupil. 
Chart 2a shows the breakdown of stakeholders by school catchment. 
4
13
8
8
Knockando Primary catchment area
Inveravon School catchment area
Glenlivet School catchment area
Aberlour Primary catchment area
Chart 1 - school catchment areas
2
1
2
12
18
Other
Staff member
Community organisation
Community member
Parent/carer
Chart 2 - all stakeholders
Page 260

Page 261

3
Closure of Inveravon School consultation report 
Question 3 – If you are a parent/carer, member of the community or staff
member, do you have a primary aged pupil or younger child affected by the
changes to Inveravon Primary School in your family? (33 responses) 
Chart 3 shows the majority of people (22, 66%) do not have primary aged children or
younger children affected by the changes to Inveravon School. 11 (33%) do have a
child or children impacted. 
Chart 3a shows 55% of stakeholders with an affected child live out with the
Inveravon Primary School catchment. 
5 5
4 4
2
3
7
2
1 1 1
Aberlour PS Glenlivet PS Inveravon PS Knockando PS
Chart 2a - stakeholders by school catchment
Parent/carer Community member Community organisation Staff member Other
7
15
11
Not applicable
No
Yes
Chart 3 - stakeholders with affected child
Page 261

Page 262

4
Closure of Inveravon School consultation report 
Question 4 – Are you currently a pupil at a Moray school? (32 responses) 
Although no respondents answered at question 2 that they were a pupil, Chart 4
shows 5 respondents (16%) answered yes to this question. 
Question 5 – Please select which school you attend from the list below. (4
responses) 
Chart 5 shows 2 (50%) from Knockando, and 1 each (25%) from Aberlour and
Glenlivet. 
4 4
2
1
Knockando PS Inveravon PS Aberlour PS
Chart 3a - stakeholders with affected child by group and school
catchment
Parent/carer Community organisation
27
5
No
Yes
Chart 4 - stakeholders who are pupils
2
1
1
Knockando PS
Glenlivet PS
Aberlour PS
Chart 5 - school attended by pupil
Page 262

Page 263

5
Closure of Inveravon School consultation report 
Question 6 – Which options do you prefer for the proposed school catchment
area? (27 responses) 
As shown in Chart 6, 14 people (52%) prefer option 3 (split catchment between
Knockando, Aberlour and Glenlivet primary schools), with 7 (26%) selecting option 1
(rezone to Knockando Primary School) and 1 (4%) indicating option 2 (split
catchment between Knockando and Aberlour primary school). 5 respondents (19%)
had no preference. 
6 people skipped this question. 
Chart 6a shows that among parents/ carers, Option 3 was most favoured and Option
1 has least support. 
Chart 6b shows 7 of the 14 people who preferred Option 3 (split catchment between
Knockando, Aberlour and Glenlivet primary schools) are in the Glenlivet catchment. 
Those in the Inveravon catchment favoured Options 1 and 3, with 3 expressing no
preference and 1 supportive of Option 2.
5
14
1
7
No preference
Option 3 - Close Inveravon Primary
School and split catchment between
Knockando, Aberlour and Glenlivet…
Option 2 - Close Inveravon Primary
School and split catchment between
Knockando and Aberlour Primary…
Option 1 - Close Inveravon Primary
School and rezone to Knockando
Primary School.
Chart 6 - preferred option, all stakeholder groups
7
1
8
5
11
3
2
Parent/carer Community member Community
organisation
Other
Chart 6a - preferred option by stakeholder group
Option 1 Option 2 Option 3 No preference
Page 263

Page 264

6
Closure of Inveravon School consultation report 
Question 7 – Do you support the closure of Inveravon Primary School? (27
responses)
As show in Chart 7, respondents are fairly evenly split, with 13 (48%) supportive of
closure and 14 (52%) against the proposal. 6 people skipped this question. 
Chart 7a shows support for the proposal was strongest among parent carers, with
69% answering yes. 
1
3 3
1
3
7
3
1
2
3
Aberlour PS Glenlivet PS Inveravon PS Knockando PS
Chart 6b - preferred option by school catchment
Option 1 Option 2 Option 3 No preference
11
2
5
7
1 1
Parent/carer Community member Community
organisation
Other
Chart 7a - support for the proposal by stakeholder group
Yes No
Page 264

Page 265

7
Closure of Inveravon School consultation report 
Chart 7b shows 70% of stakeholders from the Inveravon catchment are against the
proposed closure. 
Question 8 – Do you think any of these options should be discounted? If so,
please indicate which one(s) and give your reasons below. (27 responses) 
As shown in Chart 8, 13 people have no preference. Option 3 (close Inveravon
Primary School and split catchment between Knockando, Aberlour and Glenlivet
primary schools) was less favoured than Option 1 (close Inveravon Primary School
and rezone to Knockando Primary School) and Option 2 (close Inveravon Primary
School and split catchment between Knockando and Aberlour Primary School). 
A small number of people called for two or all options to be discounted. 
3
4
3 33 3
7
1
Aberlour PS Glenlivet PS Inveravon PS Knockando PS
Chart 7b - support for the proposal, all stakeholders by school
catchment
Yes No
13
9
7
7
No preference
Option 3 - Close Inveravon Primary
School and split catchment between
Knockando, Aberlour and Glenlivet…
Option 2 - Close Inveravon Primary
School and split catchment between
Knockando and Aberlour Primary…
Option 1 - Close Inveravon Primary
School and rezone to Knockando
Primary School.
Chart 8 - option to be discounted, all stakeholders
Page 265

Page 266

8
Closure of Inveravon School consultation report 
Chart 8a shows that among parents/carers, 44% want Option 3 to be discounted. 
Chart 8b shows that among people from the Inveravon Primary School catchment,
50% had no preference. 
4
1 1 1
5
1 1
7
1 1
6
7
0
Parent/carer Community member Community
organisation
Other
Chart 8a - option to be discounted by stakeholder group
Option 1 Option 2 Option 3 No preference
4
2
1
2 2
3
2
4
3
4
3
5
1
Aberlour PS Glenlivet PS Inveravon PS Knockando PS
Chart 8b - option to be discounted by school catchment
Option 1 Option 2 Option 3 No preference
Page 266

Page 267

Schools (Consultation) (Scotland) Act 2010 
Report by Education Scotland addressing educational aspects of
the proposal by Moray Council to close Inveravon Primary School. 
November 2022
Item 16*
Page 267

Page 268

1   | Schools (Consultation) (Scotland) Act 2010 
Moray Council © Crown Copyright
1. Introduction 
1.1 This report from Education Scotland has been prepared by His Majesty’s Inspectors of
Education (HM Inspectors) in accordance with the terms of the Schools (Consultation) (Scotland)
Act 2010 (“the 2010 Act”). The purpose of the report is to provide an independent and impartial
consideration of Moray Council’s proposal to close Inveravon Primary School. Section 2 of the
report sets out brief details of the consultation process. Section 3 of the report sets out
HM Inspectors’ consideration of the educational aspects of the proposal, including significant
views expressed by consultees. Section 4 summarises HM Inspectors’ overall view of the
proposal. Upon receipt of this report, the Act requires the council to consider it and then prepare
its final consultation report. The council’s final consultation report should include this report and
must contain an explanation of how, in finalising the proposal, it has reviewed the initial proposal,
including a summary of points raised during the consultation process and the council’s response to
them. The council has to publish its final consultation report three weeks before it takes its final
decision. Where a council is proposing to close a school, it needs to follow all statutory obligations
set out in the 2010 Act, including notifying Ministers within six working days of making its final
decision and explaining to consultees the opportunity they have to make representations to
Ministers and the special provisions that apply to proposals to close a rural school. 
1.2 HM Inspectors considered:
 the likely effects of the proposal for children and young people who live in the catchment
area of the school; any other users; children likely to become pupils within two years of the
date of publication of the proposal paper; and other children and young people in the wider
area who attend nearby schools;
 any other likely effects of the proposal;
 how the council intends to minimise or avoid any adverse effects that may arise from the
proposal; and
 the educational benefits the council believes will result from implementation of the proposal,
and the council’s reasons for coming to these beliefs. 
1.3 In preparing this report, HM Inspectors undertook the following activities:
 attendance at the public meetings held on 27 September 2022 in connection with the
council’s proposals; 
 consideration of all relevant documentation provided by the council in relation to the
proposal, specifically the educational benefits statement and related consultation
documents, written and oral submissions from parents and others; and
 visits to the site of Inveravon Primary School, visits to Speyside High School, Glenlivet
Primary School, Aberlour Primary School and Knockando Primary School, including
discussion with relevant consultees. 
1.4 As the proposal will lead to the closure of a rural school, HM Inspectors also took account of
the council’s consideration of any reasonable alternatives to closure of Inveravon Primary School.
They also took account of the likely effect on the local community and the likely effect of any
different travelling arrangements of the proposed closure.  
Page 268

Page 269

2   | Schools (Consultation) (Scotland) Act 2010 
Moray Council © Crown Copyright
2. Consultation process 
2.1 Moray Council undertook the consultation on its proposal(s) with reference to the Schools
(Consultation) (Scotland) Act 2010. 
2.2 Moray Council mothballed Inveravon Primary School in 2017 after the school roll dropped
to zero. The school has remained mothballed since that time. During 2022, Moray Council has
engaged with local residents about the potential closure of the school. The statutory consultation
for the closure of Inveravon Primary School ran from 29 August to 7 October 2022. Three public
meetings were scheduled on the 27 and 28 September 2022. Eleven people attended these
meetings including one parent with a child at the affected schools. Twenty five people completed
an online survey and five written submissions on the consultation were received. From the surveys
13 support the proposal to close the school and 12 disagree. Of the 16 parents who completed the
survey, 11 support the proposal and five do not. Currently 15 children of primary school age reside
in the Inveravon school catchment area. Families of nine of these children have formally indicated
a preference. This is to continue to send their children to their current school rather than Inveravon
Primary School, should it reopen. Community members who attended the meeting, completed the
survey and/or wrote submissions raised a range of points. These included concerns about the
original decision and process to mothball the school, the lack of information for parents about
Inveravon Primary School and the use of the school site if it does close. Children in the
three neighbouring primaries and young people in the secondary school were also consulted. A
minority of the children and young people expressed interest in the school reopening. Of these
almost all expressed their preference would be to remain at their current school if Inveravon
Primary School did reopen. 
3. Educational aspects of proposal 
3.1 HM Inspectors broadly agree with the council’s educational benefits statement and are
confident there are sufficient educational benefits to merit the permanent closure of the school.
HM Inspectors agree that children are benefitting from the wider educational opportunities across
the curriculum that attending schools with more consistent school rolls provides. The children are
experiencing opportunities to develop their capacity to work with others and build their social skills.
Currently almost all children from the Inveravon catchment area attend either Knockando or
Aberlour Primary Schools. In both schools and in Glenlivet Primary School children have
opportunities to undertake appropriate and engaging tasks and challenges as part of a group. 
3.2 All staff and parents who met with HM Inspectors agree with the proposal to close
Inveravon Primary School. A few expressed the view that the original process by which the school
was mothballed was poorly handled. However, they consider that education resources are now
best used to support the current schools in the area rather than reopening Inveravon Primary
School. If the proposal is approved this will reduce staffing levels at Knockando Primary School as
it would no longer be in a paired headteacher arrangement with Inveravon Primary School.
Despite this, staff and parents still agree with the proposal as they believe this would provide
clarity, enabling them to better plan for the future of their school. 
3.3 Children from Inveravon catchment area who met with HM Inspectors expressed
satisfaction with the school they currently attend. All see benefit in being part of a larger group of
children for both their learning and for building friendships with children of the same age.
HM Inspectors met with a few young people attending Speyside High School who had attended
Inveravon Primary School for part of the primary schooling. They remember appreciating the
nurturing atmosphere at Inveravon Primary School but overall they consider that the educational
benefits of being part of a larger school were more important for their development. 
Page 269

Page 270

3   | Schools (Consultation) (Scotland) Act 2010 
Moray Council © Crown Copyright
3.4 The proposal explores how the current catchment area of Inveravon Primary School should
be allocated if the school closes. Parents are fairly evenly split between option one, all of the
catchment area is allocated to Knockando Primary School and option three where it is split across
the three neighbouring primary schools. Almost all parents who expressed preferences have
children attending either Knockando or Glenlivet Primary Schools. There is concern from staff and
parents that reopening Inveravon Primary School would reduce the roll at Glenlivet and
Knockando Primary Schools. 
3.5 As the proposal will lead to the closure of a rural school, HM Inspectors also considered the
factors to which the council should give special regard. Knockando, Aberlour and Glenlivet
Primary Schools are all currently under capacity with fairly stable predicted school rolls in the next
five years. Should Inveravon Primary School reopen it would reduce the numbers in some or all of
three of these schools. This could leave Glenlivet and Knockando Primary Schools in particular
with an insufficient roll to provide for the range of educational opportunities they currently do.
Currently children residing in the catchment area of Inveravon travel to school either on school
transport or by private car. As Inveravon Primary School is not located in a village, this would
remain the case for almost all children. Although many would have shorter journeys, the
environmental benefit from this would be offset by the energy use in reopening the school.   
3.6 Community members and organisations are concerned that the mothballing of Inveravon
Primary School has removed a valuable community resource from the area. Moray Council have
engaged with the local community about any future use of the site should the proposal be
approved. It should be noted that Ballindalloch Estate owns most of the site. There is strong
support from all stakeholders for the site to be used, ideally with community access. There are no
community halls or similar in the catchment area although residents do access facilities in villages
and towns in the wider area. Should the proposal be approved it will be important that Moray
Council, Ballindalloch Estate and community organisations work together to find an appropriate
use for the site and building. 
4. Summary 
HM Inspectors agree that the proposal by Moray Council will result in educational benefits for the
children in the Inveravon Primary School catchment area. The proposal provides clarity for both
families and for staff in the neighbouring schools that the children have attended since the school
was mothballed in 2017. Children now attend schools with larger and more stable pupil rolls.
There are clear educational and social benefits to learning alongside peers of similar ages and
stages. The predicted school roll in the wider area makes it unlikely that all four primary schools
affected by this proposal could be sustained. Most parents and children support the proposal to
close the school. However, the mothballing of Inveravon Primary School is a loss to the
community. It will be important that Moray Council work with the site owners, Ballindalloch Estate,
and the local community to explore options for both the school building and land, should the
proposal be approved. 
HM Inspectors
November 2022 
Page 270

Page 271

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 19 APRIL 2023 
SUBJECT: MORAY’S DANDELION PROJECT 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of funding that has been secured following a bid to
the Armed Forces Covenant Trust Fund. 
1.2 This report is submitted to the Committee in terms of the Council's Scheme of
Administrative section (III) (D) (1) relating to functions of the Council as
Education Authority within the terms of relevant legislation with regard to
nursery, primary, secondary, and further education; community learning and
development and to determine the Council’s policies in regard thereto. 
2. RECOMMENDATION 
2.1 It is recommended that Committee: 
(i) note funding of £370K has been received from the Armed Forces
Covenant Trust Fund for the Dandelion project which aims to
ensure that all forces children have the right conditions and
environment in their school setting to thrive whatever challenges
their serving parent’s military commitments may generate and
agrees to implement the project arrangements of the funding bid
as set out in this report. 
3. BACKGROUND 
3.1 In March 2020 funding of £370,000 was confirmed to support forces children
in Moray. This charitable funding was allocated in order that a bespoke
support network for Forces’ children in school within the authority could be
established. The was termed the Dandelion Project and its aim was to ensure
that all forces children had the right conditions and environment in their school
setting to thrive whatever challenges their serving parent’s military
commitments would perhaps generate. 
Item 17*
Page 271

Page 272

3.2 The project, which was to be financed for 3 years by the Armed Forces
Covenant Trust, was originally intended to enable a dedicated team of staff to
be employed to provide in school support as well as provide an opportunity for
bespoke training for school staff to ensure a better understanding of the
complex nuances of service life. 
3.3 The backdrop for such a programme was the significant military footprint in
the local area in 2020 with around 2,500 personnel based at RAF
Lossiemouth and 670 at Kinloss Barracks. From school census information at
that time it was identified that overall 2200 families accompany these
personnel and 48 out of the 53 schools in the local authority area have
children from military families in attendance. 
3.4 The impact of Covid-19 from March 2020 onwards in our local authority area
was as significant as it was around the United Kingdom and further afield, and
a delay to the project was inevitable as resources were redirected to
operational requirements at the time to ensure alternative service provision
was in place throughout the council service areas. 
3.5 The situation for military families in schools within Moray has not changed
significantly during the intervening period from March 2020 – October 2022.
Both RAF Lossiemouth and Kinloss Barracks continue to see both growth and
movement in terms of service structure and personnel as well as capability
transfer including the introduction of the Wedgetail to the Lossiemouth base. 
3.6 The timing is therefore now considered to be appropriate in terms of re-
introducing the Dandelion Project to the staff and pupils within Moray but
adapted and re-engineered to support the current climate and the 
re-evaluated school requirements. Partners involved in the initial proposal
have been part of the discussion process at this time and recognise that some
elements of the initial proposal have now moved on as a result of Covid -19
and with the new technology that has been put in place for all service users
but particularly in schools in terms of IT capability. 
3.7 The wider implications of supporting families has also become more complex
as we see an increase in the number of children transitioning to Moray with
additional support needs. This requires significant input at all levels to ensure
that any child moving school as part of a military posting has access to the
appropriate resources and infrastructure to succeed. 
3.8 Given these challenges, the proposal was updated and resubmitted in
October 2022 to reflect this and an award was made as outlined below with
funding for a period of up to 3 years starting as and when the new Education
Support Officer is in post: 
• Education Support Officer (Forces Families) who would work directly from
Moray Council HQ , line managed by the Business Support Team Manager
and supporting the wider Education team.
• This role would be a highly visible and publicised single Point of Contact for
all Armed Forces Families - both those due to arrive and those already in
situ – providing bespoke support and assistance to remove any barriers
encountered.
Page 272

Page 273

• Employed directly by Moray Council, there would be a close working
relationship with the welfare teams at both RAF Lossiemouth and 39
Engineers Kinloss with referrals coming direct from Armed Forces Families,
via respective welfare teams or via schools at point of delivery.
• The grade of post reflects the experience and seniority required to assess
unique family circumstances, to credibly interface with key stakeholders
including the school placing request allocation team, the Additional
Support.
• Needs assessment team, 3rd sector support agencies and directly into
individual school establishments.
• The Education Support Officer post holder would be instrumental in raising
the standards of understanding and support offered by schools to the
Armed Forces Family, by delivering training to all staff on the needs of the
Armed Forces Family. This training will be available online across Moray
Schools and will lead to Forces Family Friendly accreditation and the
enduring changes that the original proposal envisioned. 
3.9 The establishment of a single post will reduce the challenges of interacting
with numerous departments and the potential for conflicting advice or
information. By being embedded within the wider Education / Business
Support Team, the new post holder will have a broader understanding of
education across Moray and be able to direct families towards other non-
educational sources of support or interest also. 
3.10 All funding for the Education Support Officer post will be allocated to the
council and will sit within the Education Resources and Communities service
and will be managed by the Business Support Team Manager. Administration
duties will be supported from within the Business Support Team on a match
funded basis. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Reflective of priorities within the Corporate Plan with particular regard to
(3) provide a sustainable education service aiming for excellence and (4)
day to day service delivery in line with council values of ambitious,
improving and responsive. With regards to the 10 Year Plan (Local
Outcomes Improvement Plan LOIP), (2) building a better future for our
children and young people in Moray through equity of learning
experience offered across our schools. 
(b) Policy and Legal 
As an employer who fully supports the Armed Forces Covenant, Moray
Council acknowledge and understand that those who serve or who have
served in the armed forces, and their families, should be treated with
fairness and respect in the communities, economy and society they
serve.
Page 273

Page 274

(c) Financial implications 
The total cost of the project for the period of three years has been
supported as a grant (£370,000) from the Armed Forces Covenant Trust
and therefore there are no financial implications for the authority. The
grant funding will sit within Education and be managed by the Business
Support team Manager. 
(d) Risk Implications 
There is no risk as a result of the project being implemented. The greater
risk would be ensuring appropriate support was in place for forces
families moving in to the area if no appointment was able to be made.
Administrative support was included as a match funding element of the
original bid and will be provided from within existing resources for the
period of the project as per the allocated grant. As noted below this can
be accommodated given the wider pressures the new role will support.
The successful applicant would be appointed by Moray Council and so
all employment risks sit with the council, with the contract confirming the
parameters of employment to this temporary funded post. 
(e) Staffing Implications 
This would be offered on a secondment basis for a period of 23 months
initially. By supporting forces families moving in to the area, this new
post will alleviate some of the workload pressures currently experienced
by the Business Support Team Manager who currently supports these
often extended conversations alongside her normal remit. 
(f) Property 
This is a full time position that would require access to officers within
education as well as the Business Support Team. Therefore a desk
space within the current Business Support Team room allocation would
have to be secured. Given that this is an additional post, IT equipment
would also be required for the successful candidate but this is fully
funded through the original bid funding. 
(g) Equalities/Socio Economic Impact 
There is no requirement for an equality impact or socio economic impact
assessment to be carried out. 
(h) Climate Change and Biodiversity Impacts 
There are no climate change issues arising as a result of this report.
Page 274

Page 275

(i) Consultations 
The Head of Education (Chief Education Officer), the Head of Education
Resources and Communities, the Chief Financial Officer, the Equal
Opportunities Officer, and Committee Services Officer have been
consulted and are in agreement with the contents of this report as
regards their respective areas of responsibilities. 
5. CONCLUSION 
5.1  Committee is asked to note funding of £370K has been received from the
Armed Forces Covenant Trust Fund for the Dandelion project which
aims to ensure that all forces children have the right conditions and
environment in their school setting to thrive whatever challenges their
serving parent’s military commitments may generate and agrees to
implement the project arrangements of the funding bid as set out in this
report. 
Author of Report: Lindsey Stanley, Business Support Team Manager
Background Papers: 
Ref: SPMAN-9425411-171 
Page 275

Page 276

Page 276

Page 277

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 19 APRIL 2023 
SUBJECT: PARTNERSHIP COMMUNITY LEARNING AND DEVLOPMENT
PLAN UPDATE 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the work done so far to deliver on the statutory
Moray Community Planning Partnership (CPP) Community Learning and
Development (CLD) Plan and on emerging priorities for the final 18 months of
the plan. 
1.2 This report is submitted to Committee in terms of Section III (D) 1 of Council’s
Scheme of Administration relating to all the functions of the Council as an
Education Authority. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee: 
(i) notes the positive impact of partnership working in delivering on
the Moray Community Planning Partnership CLD Plan (2021-24); 
(ii) notes the allocation of £745,218 from the UK Shared Prosperity
Fund for partnership delivery of the ‘Multiply’ programme to
support adult numeracy; and 
(iii) considers the emerging priorities which have been identified prior
to discussion with the Community Planning Board and
incorporation into a refreshed work plan. 
3. BACKGROUND 
3.1 Moray Council has lead responsibility on behalf of the Community Planning
Partnership to produce the statutory three year Community Learning and
Development (CLD)  Plan as per the Requirements for Community Learning
and Development (Scotland) Regulations 2013 (CLD Regulations).
Item 18*
Page 277

Page 278

3.2 The current Partnership CLD Plan was approved by the CPP Board on
22 September 2021 and endorsed by this committee on October 6 2021 (para
9 of the minutes refers). The Plan covers the period September 2021 –
August 2024 and is currently at the mid-term stage of delivery. This report
updates committee on progress made so far in delivering on the Plan through
the CLD Strategic Partnership (CLDSP). 
3.3 The CLDSP is the strategic lead group with responsibility for delivering on the
plan. There are representatives from UHI Moray (who currently chair), Skills
Development Scotland; Moray Pathways, LEAD Scotland, tsiMORAY and
Highlands and Islands Enterprise. Council services are represented through
Communities (CLD), English as Additional Language (EAL), Education,
Communities and Volunteering.     
3.4 Partners agreed to use national Key Performance Indicators (KPI’s)
developed by CLD Managers Scotland to report on delivery against the Plan.
The results of these are summarised in Appendix 1 and can be grouped in
relation to adult and family learning; youth work; community development and
capacity building and mental health and wellbeing. Partners have also
developed case studies which capture some of the impact of the work against
the priorities identified in the CLD Planthese can be seen at 
https://www.thinglink.com/card/1692896848206889955 
3.5 The Plan had an initial focus on Covid recovery and (Appendix 2) captures
the actions taken in the first year which demonstrate significant progress
against the initial plan priorities and meet the Plan’s aim to ‘shift the balance
of delivery to provide more face-to face support and to create opportunities to
help people reconnect within their communities.’ 
3.6 This CLDSP meet regularly to monitor progress in delivery of the Plan.
Partners used the new How Good Is Our Community Learning and
Development 4 framework to evaluate the quality of partnership working
around the CLD Plan – the results of which have been added to the Education
Scotland case studies website (Appendix 3). 
3.7 The self-evaluation identified examples of improved partnership working;
enhanced collaborative working linked to external funding investments and
new strands of work being developed strategically. 
3.8 The most recent example of this is the ‘Multiply’ programme to improve
numeracy which is part of the UK Shared Prosperity Fund drawn down
through the Moray Economic Partnership. The CLD Strategic Partnership will
have a co-ordination role around the ‘Multiply’ allocation of £745,218 to be
completed by 31st March 2025. As per the approved governance
arrangements final decision making on ‘Multiply’ funding approval is located
with the Local Economic Partnership. 
3.9 As always, there is room for improvement with partners keen to raise
awareness of the impact of the difference CLD approaches make in Moray
and to build on the collaborative approach to delivery over the lifetime of the
current plan and into the next one from 2024-27.  
Page 278

Page 279

3.10 Partners have identified a number of emerging themes which they wish to
take account of in the remaining 18 months of the current plan. The
overarching themes remain the same but partners are working together to: 
• Deliver on the ‘Multiply’ programme to improve numeracy in Moray.
• Understand the impact of reduced volunteering levels (for example
Health and Social Care Communities and Volunteering Team have
noted a 30% reduction in their volunteer numbers) and actions needed
to support and sustain volunteering.
• Understand and respond to the cost of living crisis and how this is
impacting on services, agencies and communities.
• Continue ethos of working strategically and in partnership to maximise
the impact of external funding streams in improving outcomes for
Moray communities.
• Identify how best to respond to the projected rise in Unaccompanied
Asylum Seeking Children and other refugee/ asylum seekers in Moray.
• Seek support from Community Planning Partners to respond to LOIP
priorities in relation to community meeting spaces – particularly in New
Elgin. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The Partnership CLD Plan sits under the auspices of Community
Planning and includes reporting on progress in relation to the LOIP. A
separate report will be taken to the CPP Board for endorsement. 
The CLD Plan contributes to the Corporate Plan- particularly in relation
to Our Place priorities. 
(b) Policy and Legal
The statutory requirement to have a CLD Plan outlined in 3.1 has been
met. The next version of the Plan will require to be in place by
September 2024. 
(c) Financial implications
None 
(d) Risk Implications
None 
(e) Staffing Implications
None 
(f) Property
When the report goes to the CPP there will be a specific request for
partner support to address the issue of a lack of community meeting
spaces in New Elgin which has a significant impact on LOIP delivery.
Page 279

Page 280

(g) Equalities/Socio Economic Impact
CLD partners deliver both universal and targeted services which engage
with large numbers of individuals and organisations. Typical outcomes of
CLD work include increased literacy and numeracy skills, enhanced
employability, improved health and wellbeing and increased participation
in community and civic life. 
(h) Climate Change and Biodiversity Impacts
The work of CLD partners in Moray contributes positively to addressing
the climate emergency. Partners have been involved in delivering PB
activities which have addressed environmental concerns – e.g. youth led
community garden developed as part of Back on Your Feet Participatory
Budgeting process. 
STEM workshops have skilled practitioners to address climate change in
their work and initiatives like the Climate Assembly create a space for
people to discuss practical steps to respond to climate change. 
(i) Consultations
The Head of Education Resources and Communities, the Chief Financial
Officer, the HR Manager, the Equal Opportunities Officer and Committee
Services Officer, have been consulted on this report and their comments
have been incorporated.   
5. CONCLUSION 
5.1 Committee is asked to note the progress made by the CLDSP in
delivering on the Partnership CLD Plan as evidenced by the information
attached to this paper. 
5.2 Committee is asked to comment on the refreshed priorities before they
are taken to the CPP Board. 
Author of Report: Kevin McDermott, Communities (CLD) Service Manager
Background Papers: 
Ref: SPMAN-9425411-172 
SPMAN-9425411-173 
SPMAN-9425411-174 
SPMAN-9425411-175
Page 280

Page 281

Statistics pooled from work of Moray UHI; tsiMORAY, Moray Pathways, SDS, LEAD Scotland, Moray Council’s
Communities CLD teams, Libraries Service and Communities &Volunteering Team (HSCP) 
KPi 6a and 7a refer to children and are not reported on other than in the context of family learning. 
Appendix 1
2021 - 2022 MORAY CLD STRATEGIC PARTNERSHIP
Key Performance Indicators (KPi 1-13)
Totals
KPi1 Number of adults engaged in CLD activity 3,318
KPi2 Number of adults receiving completed nationally recognised awards through CLD
activity (SCQF levelled and awards such as Adult Achievement Award including
sectional certificates)
216
KPi3 Number of adults gaining wider achievement awards, local awards, and those not
nationally recognised, through CLD activity (e.g., Health Issues in the Community &
Keystone Award)
203
KPi4 Number of adults engaged in family learning through CLD activity 496
KPi5 Number of children/young people engaged in family learning through CLD activity 498
KPi6b Number of young people engaged in CLD activity 2263
KPi7b Number of young people receiving completed nationally recognised awards
through CLD activity
523
KPi7c Number of young people receiving sectional certificates towards above Awards
(sectional certificates only to be included if full award not completed)
34
KPi8 Number of young people gaining wider achievement awards, local awards and
those not nationally recognised, through CLD activity
Moray Pathways 16-24yrs 
248 
438
KPi9 Number of adults with improved mental health and wellbeing outcomes through
CLD activity
1060
KPi10 Number of children/young people with improved mental health and wellbeing
outcomes through CLD activity
349 
KPi11 Number of community groups receiving capacity building support through CLD
activity
292
KPi12 Number of adults and young people taking part in influence and engagement
activity through CLD – (including community planning / participatory budgeting / local
and national consultations / ...
2104
KPi13 Number of adults and young people reached and engaged with through one-off
promotional events / drop-ins / community events / engagements / etc.
2500 
Item 18*
Page 281

Page 282

Page 282

Page 283

Item 18*
Page 283

Page 284

Partnership CLD Work Plan
Individually the CLD Strategic Partnership members will continue their own focussed work and share this so
there is a collective picture of learning opportunities and community activity.  The real value of the
partnership is through analysing data and creating actions or accessing and progressing opportunities
through collaborative working so we can make a difference to communities. 
The insight from the inequalities case studies carried out by the Fairer Moray Action Group  reinforces the
daily challenges people face before they contemplate learning or community activity. The partnership will
respond to emerging need as Covid tiers and access to facilities change and as a result this plan is a live
document which can be adapted as required
The work plan is built around the strategic priorities highlighted in the one page summary visual. We have
referred back to the cross cutting themes and LOIP priorities in relation to our three priorities  but not for
the workforce related priority 4 or the governance related actions as these are more inward focussed than
with communities and learners. 
• Priority 1: Learning for All
• Priority 2: Active Citizens and Communities
• Priority 3: Participation & Community Voice
Cross-cutting themes:
1. Addressing impacts of rurality & poverty
2. Improving mental health & wellbeing
3. Addressing social isolation & helping people to reconnect. 
Linking back to the LOIP 
The work plan outlines the action and links it back to the Local Outcomes Improvement Priorities (LOIP)
relating to the Delivery Framework for the Empowering and Connecting Communities strand. 
LOIP Empowering Communities Outcomes
• Develop stronger, more resilient, supportive, influential and inclusive communities. 
• Improve life chances for people in Moray experiencing the greatest inequality of outcomes. 
LOIP Actions 
1. Develop and implement a Community Wellbeing Survey identifying and responding to community
needs. (L1)
2. Support Community Anchor Organisations to extend reach and involvement of those who are
experiencing poverty and greatest inequalities and therefore less likely to participate (L2) 
3. Support to maintain delivery of current and develop further locality plans as live active documents
with meaning for the community. (L3) 
4. Encourage and support the softening of the location boundaries for NE and BCE so that a wider
population benefits where appropriate. (L4)
5. Promote and support Community Wealth Building initiatives to build wealth and prosperity within
our communities (L5) 
6. Capacity building support to community anchor organisations to become more involved with local
decision making. Through support to develop locality plans identifying key priorities for their
communities.(L6)
7. Ensure all communities have access to a range of learning offers to meet needs, focussing on the
most disadvantaged groups. (L7)
Page 284

Page 285

Page 285

Page 286

Partnership CLD Work Plan 
Theme 1: Learning for Life
LOIP - Improve life chances for people in Moray experiencing the greatest inequality of outcomes 
Activity  
(LOIP link) 
Year 1  Summary  year one 3 year Performance Target Rag
Status
Cross
Cutting
themes
Skills for life & work 
(L7) 
M Power programme
offered and piloted in
Secondary Schools and
impact evaluated for
school leavers;
M Power has been adopted into core CLD Youth Work
offer. 49 young people took part in this strand during the
first year of the plan with young people progressing into
positive destinations. 
Over 80 pupils participate in
programme. All 8 schools offer
programme; 
1
Moray pathways to
improved
employability 
(L7)
Moray Pathways at the
Inkwell (employability and
training hub) evidences
increased CLD partners’
involvement with regard
to referrals and
progression routes.
There were eight core partners inputting to the hub in first
quarter of plan with a further 6 contributing in the
remaining quarters. 
Employability Team, CLD Adult &Family Learning, Moray
College training department, Elgin Youth Development
Group, Moray Wellbeing Hub, Lossiemouth Entertainment
Academy.  Lead Scotland, Moray Reach Out, Enable Works,
Barnardos, Apex Scotland, Social Enterprise Academy
FACT, WEA ( Aberdeen),
10% increase on 2021-2022
baseline 
1,2
Digital Skills 
(L7)
Digital Mentoring Youth
project piloted supporting
community groups with
digital skills/practical
projects
A small group of 3 young people had started on this
project but it was unable to continue as a result of key
staff unavailability. 
Other digital projects have since developed and elements
of the digital upskilling approach is now included within
the support offer for unaccompanied asylum seeking
children/young people.
30 young mentors trained &
accredited.
15 learners/activists
supported. 
3
Page 286

Page 287

ESOL 
(L7)
EAL pupils are made aware
of the opportunity to
study ESOL at Higher Level
through Moray College. 
In the academic year 22/23 there was a 160% increase in
Nat 5 students (from 5-13). 
There was a slight drop in higher candidates (8-7) but that
will hopefully balance as current Nat 5 students’ progress. 
10% increase annually on EAL
pupils accessing Nat 5 and
Higher level ESOL
qualifications.   
L7
Partnership research with
EAL families and wider
community to understand
awareness and demand
for ESOL learning
opportunities from
informal through to
accredited learning.
ESOL survey was carried out by partners. Increase UHI
provision to meet demand as well as additional short term
hybrid provision for Ukrainian learners over summer 2022
and the development of community based ESOL provision
through CLD. 
ESOL learners are able to
access a range of learning
options and are able to fully
participate in learners’
forums. 
L7 
Page 287

Page 288

Theme 2: Active Citizens and Communities
• LOIP – Develop stronger, more resilient, supportive, influential and inclusive communities.
Activity
(LOIP link) 
Year 1  Summary Year One Performance Target RAG
status
Cross
Cutting
themes
Valuing volunteering,
support people to get
into volunteering 
(L2) 
Partnership promotion of
CLD volunteering  charter
by CLDSP; 
Promotion of Volunteer
Friendly Award (VFA) ; 
Annual Volunteers week
celebration
tsi MORAY led on Volunteer Week celebrations in an
effective social media campaign that focussed on 20
organisations working with volunteers. 
Three Moray voluntary organisations received the Queens
Award for Voluntary Service – Moray Food Plus, Buckie
Boys Brigade and the Moray Duke of Edinburgh
Committee. 
The Volunteer Friendly Award has now changed and is
delivered online by the national charity Volunteer
Scotland. Good practice continues to be shared and
promoted within tsi MORAY Volunteer Managers Network. 
Significant levels of volunteering with older people being
supported though Health and Social Care Partnership
Communities & Volunteering Team. 
All CLD strategic partners
adopt VFA principles. 
Increased recognition of the
role and impact of volunteers
in Moray. 
2,3 
Neighbourhood
approach to develop
community owned
plans 
(L1 , L3, L4) 
LOIP priority communities
in Buckie and New Elgin
supported to sustain and
develop activity and
involvement as new
groups emerge in Keith,
Lossiemouth and Forres. 
Buckie Localities Plan – Extensive community engagement
around reviewing and refocusing on community priorities.
Community lunches to connect people with services were
restarted and have been highly successful. Community
feedback events further refined the priorities of the new
Plan before its launch. 
New Elgin Localities Plan – Development of new working
groups has led to increased engagement activities to reach
more local residents. Targeted events around older people
and pensions, family learning and pop up engagement
sessions. 
Anchor organisations
supported to 
review progress and identify
areas that require further
partner support for
development and
improvement. 
1,2,3
Page 288

Page 289

Locally lead work in Lossiemouth has helped Lossiemouth
Development Trust produce their new plan In Forres
continued consultation has happened with two well
attended community events and other outreach activity.
Work has started in Keith with high levels of engagement
in the community survey after a successful engagement
process which included outreach sessions in the
surrounding settlements. 
Continuing to
support & develop
community action
groups through
training & other
initiatives
(L6) 
Local action groups
supported to deliver on
initiatives and projects. 
Community Council elections were held and 17 were
formed. 
Area Forums continue to meet in Buckie and Forres with
Milne’s looking to reform. Buckie have had a productive
year with increased participation in meetings and
developments like the formation of a new Development
Trust Steering Group and securing a short term lease for a
short term community warm hub. 
HIE continue to support community anchor organisations.
118K of Covid Recovery Funding was distributed to 8
organisations. Development Officer posts funded in
Lossiemouth ,Forres, Tomintoul& Glenlivet, Portgordon,
Dufftown, Elgin Youth Café and Cullen 
Community Support Unit continued to support community
groups across Moray directly helping them leverage in
external funding.
Community groups in Moray
are able to progress actions
they have identified as local
priorities. 
1,3
Developing
community resilience
plans 
(L3 and L6)
Joint Community Councils
develop 6 Resilience plans.
Awareness of benefits of
resilience planning shared
at conference hosted by
Resilience Partnership
Group. 
Community Support Unit helped 12 local groups draw
down £207k of funding from the SSEN Resilience Challenge
Fund – all working towards localised Resilience priorities. 
All community councils to
have their own Community
Resilience Plans in place by
2024 
1,3,
Page 289

Page 290

Theme 3: Participation & Community Voice
• LOIP – Develop stronger, more resilient, supportive, influential and inclusive communities.
Activity
(LOIP link) 
Year 1  Summary Year One  Performance Target RAG
Status 
Building on existing
forums to foster
inclusive community
participation and
engagement
(including young
people) 
(L6)
Work with CPP to relaunch
Community Engagement
Group.(CEG)   
Review of current
provision and areas for
improvement and whether
any support required; e.g.
young people’s
participation/
involvement.
Stakeholders were involved in co-designing the new
refreshed Community Planning Partnership Community
Engagement Strategy – which was endorsed by the CPP
Board in November 22. 
tsiMORAY facilitated Children and Young People’s Forum,
Fairer Moray Forum Action Group, and Health and
Wellbeing Forums and Moray Climate Assembly. 
Moray is represented by two MYSP’s at the Scottish Youth
Parliament and young people have participated in the
Northern Alliance Youth Advisory Group. 
Community Planning
Partnership Engagement
Strategy is refreshed. 
Wider community group
involvement in Community
Engagement group 
Improved quality of
community engagement in
Moray. 
1,2,3
Further roll out of
participatory
budgeting 
(L5)
PB programme delivered
around play parks in
Moray – piloting the use
of the CONSUL online
engagement tool and
building on previous
approaches (e.g.) with
care experienced young
people. 
Increase the number of
council services utilising
PB as a method to
prioritise spending
The main council service to engage through PB has been
the Open Spaces Team re Playparks in Rothes (120K)
Findochty (70K), Cullen, and (74K). 
The Money for Moray Partnership allocated 150k through
PB funding, 50k of which was for young people through
the Back of Your Feet Programme which funded 20 youth
led health and wellbeing projects. 
Partners worked together to allocate significant amounts
of external funding – over £257K  Mental Health and
Wellbeing funds were distributed through a representative
tsi panel; 6 projects were funded through the Community
Priorities Fund with a further 6 through Carbon Neutral
Communities Fund. 
Moray Council is moving
forward in its commitment to
meet the 1% requirement in
the Community
Empowerment Act. 
1,2,3
Page 290

Page 291

Theme 4: Workforce Development 
Activity Year 1  Summary Year One   Performance Target RAG Status
Digital skills for
learning 
Skills rapidly learnt
consolidated; Gaps
identified and supported. 
10 organisations took part in Cyber Resilience Training.
LEAD Scotland delivered sessions on Thinking Digitally
at SCQF Level 6.  Moray Pathways Digital Champion
supported 81 individual digital support sessions
carrying out 67 Essential Skills Assessments.  
Digital skills need met in annual
appraisals 
8 champions identified 
Increasing
understanding of a
rights based
approach with CLD
providers in Moray.
Partnership capacity
building programme to
raise awareness of CLD as
a rights based activity. 
Training was delivered on the United Nations
convention on the Rights of the Child through the
wider Learn North partnership. Staff also took part in
training delivered by Education Scotland and Youth
Link. 
CLD partners understand and use
a rights based approach with
communities and individuals 
Career pathway and
progression routes to
further skill and grow
the CLD workforce 
Work with CLDSC, Learn
North and Northern
Alliance plus CLDMS to
deliver CLD generic
inductions on-line. 
Moray workforce survey
completed and priorities
identified.
Moray practitioners both contributed to and
participated in the Share, Shape , Sustain programme
of CPD with inputs from Moray Wellbeing Hub , adult
and family learning and on Participatory Budgeting. 
16 people took part in Get Ready for Youth Work
training as the first step to a career in youth work. The
next progression will be to the PDA in Youth Work
which is planned for year 2.
CLD recognised and promoted as a
career choice by all partners – and
qualifications actively sought out
in recruitment processes. 
Staff and volunteers access to
accredited learning opportunities. 
10% increase in CLDSC
membership in Moray. 
Partnership approach
to training offer to
community groups
and organisations
Workforce subgroup
expanded to create the
Capacity Building Training
Calendar delivered
annually 
• Q1 – Challenge Poverty Week programme of events
and Vulnerable Adult training ( 16 orgs) 
• Q2 – Cyber Resilience Training; Defibrillator
training; How Good Is Our CLD session for third
sector
• Q3 – Get Ready for Youth Work, Child Protection,
REHIS, Intro to STEM; STEM and Mental Health.
• Q4 – Gaelic, Child Protection, Alcohol Brief
Intervention Training, Confidence 2 Cook Training
for Trainers, Local Health Walks. 
Learning offer is linked to
identified needs and meeting CLD
Plan priorities and cross-cutting
themes. 
Page 291

Page 292

Theme 5: Governance - CLDSP Improvement Actions 
Activity Year 1  Summary Year One  Performance Target RAG Status
Provide quarterly
statistics linked to
KPI’s to CLDSP for
monitoring purposes 
4 quarterly reports to
CLDSP, CPOG and LOIP
Targets set after 2nd
quarter.
Quarterly reporting has been initiated and discussed at
CLD Strategic Partnership. Year One KPI’s will; act as
benchmark for the rest of the Plan. 
Data is used to report back to CPP through quarterly LOIP
reporting.
Increases on benchmark data
created in Q1 and Q2 of the
new plan. Samples confirm
target audience achieved 
Improve sequencing
of meetings to
streamline reporting
on LOIP
Meetings structured to
ensure partnership
scrutiny of LOIP reports
prior to submission.
Meetings have been timetabled more regularly but for
shorter duration with a cycle of business agreed in
advance. There were two meetings with a specific focus on
the LOIP and the work in New Elgin and Buckie. 
Partners carried out a robust year one self-evaluation
using the How Good Is Our CLD 4 Framework. . 
CLD Strategic partnership are
able to report on performance
and to demonstrate the
impact of improved
partnership working. 
Revisit the risk
mapping every 6
months to identify
gaps and needs 
Communities identified
where provision has not
re-opened and contact
made 
Analysis of availability and
community access to 
tsiMORAY led on the partnership delivery of Community
Based Adult Learning provision which met needs and gaps
identified in the initial consultation about the CLD Plan.
Learning sessions were delivered throughout Moray in
order to meet these identified needs. 
CLD service starting to deliver community based ESOL –
again as part of co-ordinated partnership working with UHI
Moray
CLD regulations are met and
information contributes to
formation of next Partnership
CLD Plan. 
Agreement to adopt
case-studies/other
mediums to evidence
impact of work by
partnership
Moray Strategic CLD
Partnership develops
Word press website to
store and highlight partner
case studies on effective
delivery. 
Partners have pulled together a suite of case studies which
will be added to the webpage to Increase transparency
and access to information around the CLD Plan and the
work being done in Moray. 
Moray CLD Strategic
Partnership is able to
demonstrate the impact of
improved partnership working
on performance. 
Page 292

Page 293

Leadership focus
with the new HGIO4? 
New members induction
to CLD completed; 
CLDSP focus on 2 QI’s &
learning embedded
CLD Strategic Partnership used the How Good Is Our CLD 4 
Model to evaluate the impact and effectiveness of
partnership working – shared as a case study on the
Education Scotland website. 
Working knowledge of the
new framework applied by
partners in other settings 
To develop a
partnership approach
to quality assurance 
Programme developed
and piloted linked with
North Alliance. 
Agreement that partners across the 8 authorities can
request support with joint work and Associate Assessor
type provision. 
Moray delivery within the “Share Shape Sustain” on-line
CPD sharing good practice/learning opportunities.  Follow
up questions received from other local authorities in youth
participatory budgeting and CHIME. 
Moray practice benefits from
supportive external scrutiny
and opportunities for peer
learning. 
Addressing impacts
of poverty in Moray 
Participate in Challenge
Poverty Week to review
case-studies for CLD
practice issues. 
Put in place measures to
support learners and
activists and signpost
them to partner and wider
CLD provision. 
Core partners engaged with Challenge Poverty Week
2021which included on-line workshops; a Real Living Wage
campaign; Stalls in Forres, Elgin, Buckie and Keith. 
2022 focussed on promoting the Money Worries leaflet
ensuring communities were aware of supports available
and signposted to resources. Support to community lead
initiatives to build resilience and capacity. 
An updated Inequalities in Moray report is being collated
to document the voices of residents and organisations. 
Partners are increasing the
involvement of people who
experience poverty and
helping them to  
access support and learning
opportunities. 
Page 293

Page 294

Page 294

Page 295

Appendix 3
Moray CLD Strategic Partnership (CLDSP) Self-Evaluation 2022
Purpose: to reflect on the first year of the new CLD Plan and to discuss how
we are working as a partnership
This is an abridged version which was carried out using challenge questions from
‘How good is our community learning and development? 4th edition’. 
1. What do we do collaboratively that only this partnership achieves -What’s
special? 
Partners recognised that the Moray CLDSP is a unique space for stakeholders with a
specific CLD remit and those whose work includes CLD approaches. Partners are able to
share information on current activity and to identify emerging themes and opportunities.
This often leads to improved partnership working 
External funding streams have enhanced collaborative working – for example the co-
ordinating role that the group played to support tsiMORAY in delivering Community Based
Adult Learning (CBAL) activities which were built around meeting needs identified by
communities in the production of the Partnership CLD Plan. 
Partners recognise that there is still work to be done and through strategic partners. For
example, Highland and Islands Enterprise invest in numerous community anchor
organisations. These community anchor organisations are not directly involved in the
CLDSP, but the link back via HIE ensures that the work is linked back to the CLD Plan. 
Moray Partners have a responsibility and a remit to represent CLD in other partnership
settings – the development of the Inequalities in Moray reporting through the Fairer Moray
Forum Action Group is a good example of this. 
In terms of Improvement Priorities it is acknowledged that more needs to be done to
promote the work being done in delivery of the CLD Plan. 
Question 2:    3.2 Challenge Question                                                                                         
How well do leaders at all levels initiate, negotiate and resource   
collaborative working to improve outcomes? 
There have been clear examples where partners have worked well together to deliver on
priorities in the CLD Plan as well as meeting other key objectives described by one
partner as ‘the intersectional work we do – a strength’. 
There has been a change to the breadth of delivery of ESOL in Moray informed by the
survey carried out by the CLDSP. There have been innovations like the delivery of online
learning to Ukrainian nationals funded through Moray Pathways using an external provider
( the WEA); the development of community based ESOL through Communities (CLD) and
the continued growth in academic delivery through UHI Moray (all connected and all
delivered in partnership). 
Improved networking and connections between partners accelerated support to the small
number of Unaccompanied Asylum Seeking Children (UASC) in Moray. Partner
involvement in the panel process supported tsiMORAY to deliver a significant amount of
Community Mental Health and Wellbeing Funding – which supported a wide range of
community groups and activities meeting needs identified in the Partnership CLD Plan.
Partners have worked together strategically to develop a framework to deliver on the
Multiply numeracy programme in Moray which will allow us to widen our adult learning
Item 18*
Page 295

Page 296

offer and also contribute positively to the cost of living crisis as one of the key
interventions is around financial literacy. 
Partners would like to see more joint planning and co-ordination, particularly where there
are opportunities to tap into particular funding streams. Partners acknowledged that some
of the timelines around funding announcements and spending windows create challenges
that can work against strategic co-ordination.  It was noted that the outputs of partnership
work (such as delivering more community based adult learning or capacity building
opportunities) are creating more opportunities for people in communities to benefit from
CLD. 
Question 3: How well do we ensure that all partners are equally committed to
delivering the intended outcomes that a partnership is working to achieve? 
A common unifying theme that resonated with people was a sense of having shared
values and purpose – and a recognition that the focus on social justice and inequality
makes it easier to locate the work of the CLDSP alongside other key policy documents
such as the Children’s Services Plan. 
Funding opportunities have allowed for ‘strategic and iterative growth’  - but some partners
felt that now was the time to reflect on what we have learned over the first year of the plan
and to identify areas in which we can work collectively as a partnership to address. There
was a sense that social justice should be the driver for all key priorities and a challenge to
honestly reflect on how much of our focus is on addressing these structural barriers (e.g.
people with disabilities; closing the attainment gap etc.). 
Question 4:                                             
How well do we forward plan and prepare to meet changing needs?        
Partners recognised again that working collectively can help to take a strategic and co-
ordinated approach – Multiply being the most recent example of this. Partners recognised
the wider circumstances and challenges which are affecting the sector such as precarious
core third sector funding and that these will continue to cause uncertainty. 
The first year of the plan was always designed to be responsive to the impacts of the
pandemic. The unknown that emerged during 2022 has been the cost of living crisis.  
Funding streams such as the Community Mental Health and Wellbeing Fund, Just
Transitions, Multiply and Shared prosperity have all been able to respond to some of
these emerging challenges in a way not explicitly identified in the CLD Plan. 
Partners recognise the need to look back (which requires all to complete KPI returns) and
to look forward based on the situation in Moray now. The CLDSP is seen as a supportive
environment in which to do this and that there is an opportunity to revisit the work plan
format and agree on refreshed priorities we can collectively address. 
Partners used ‘How Good Is Our CLD ‘framework and levelled as GOOD. Most
partners levelled at 4 but two who operate across larger geographies scored higher at 5 (with the
median being 4 and the average 4.2)
An evaluation of good means that there are important strengths within CLD provision yet
there remains some aspects which require improvement. The strengths have a significantly
positive impact on almost all service users and learners. The quality of service users’ or
learners’ experiences is diminished in some way by aspects in which improvement is
required. It implies that providers should seek to improve further the areas of important
strength and also take action to address the areas for improvement.
Page 296

Page 297

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 19 APRIL 2023 
SUBJECT: INFORMATION REPORT: PRIMARY 1 DEFERRAL AND EARLY
LEARNING AND CHILDCARE ELIGIBILITY 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the change in legislation for Primary 1 Deferral
and Early Learning and Childcare (ELC) Eligibility and the service’s position
regarding this. 
1.2 This report is submitted to Committee in terms of Section III (D) (1) of the
Council's Scheme of Administration relating to exercising the functions of the
Council as an Education Authority. 
2. BACKGROUND 
2.1 In Scotland all parents and carers have the legal right to defer their child’s
entry to primary school if they are not yet 5 years old at the beginning of the
school year. 
2.2 Nationally the standard approach was that the youngest children, with a
January or February birthday, would automatically be entitled to an additional
year of funded ELC. While children with birthdays between August and
December would have to apply to the local authority to request funded ELC
for that year. 
2.3 Through discretionary decision making in Moray any child whose date of birth
fell after the beginning of the school year, in August, was entitled to funded
ELC for that year irrelevant of which month the birthday fell. 
2.4 In October 2019 the Scottish Government committed to legislate to entitle all
children whose school start is deferred, access to funded ELC in their
deferred year which would bring all 32 local authorities in line.
Page 297

Page 298

2.5 In December 2020 a Scottish Statutory Instrument was brought before the
Scottish Parliament to ensure that the legislation would be realised in this
parliamentary session. The change meant it would align the funded ELC more
closely with the existing right to defer, for children in this age group. This then
should allow families to make decisions for their children, based on what they
feel is in the best interested of the children, without the financial barrier of
additional ELC costs. 
2.6 A joint implementation plan was devised, taking cognisance of the Covid-19
pandemic and the ongoing expansion to 1140 hours funded ELC. 
2.7 A phased approach was taken during 2021-22 and 2022-23 which involved 5
pilot authorities including Angus, Argyll and Bute, Falkirk, Scottish Borders
and Shetland Islands. 
2.8 The pilot implementation allowed the opportunity to monitor the impact of the
policy and to inform the assessment of likely update of the entitlement. 
2.9 Throughout the pilot evaluations were made of the varying approaches and
data was collected by Scottish Government to understand the impact of the
policy on ELC capacity, financial cost and parental understanding. 
2.10 On completion of the pilot the agreement between Scottish Government and
CoSLA outlined that from August 2023 all children who defer their entry to
school for a year can automatically access an additional year of funded ELC. 
2.11 The funded ELC places will be available for children who are deferring the
school year beginning August 2023. 
2.12 In Moray we will continue to support all parental requests to defer if the child’s
date of birth falls after the start date of each new academic year. 
3. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)
This report relates the priority ‘Provide a sustainable education service
aiming for excellence’ from the Corporate Plan and to ‘Building a better
future for our children and young people in Moray’ from the LOIP. 
(b) Policy and Legal
Under the 2006 Act (Scottish Schools Parental Involvement Act 2006)
there is a duty to involve parents in their child’s education, including
attending ELC in a public school. The upcoming change in legislation
does not affect this right and will allow families to make decisions based
on what they feel is in the best interest of their children, without the
financial barrier of additional ELC costs.
Page 298

Page 299

(c) Financial implications
There has been no indication from the Scottish Government about any
change to funding as a result of this change in the national position. 
However, in Moray this does not represent a change in service offer and
so there are no financial implications arising directly from this report.   
(d) Risk Implications
There is a risk that as more families choose to defer children there will
be less space in ELC settings for eligible 2 year olds or new funded
3 year olds. 
(e) Staffing Implications
No staffing implications arising directly from this report. 
(f) Property
There are no property issues arising from this report. 
(g) Equalities/Socio Economic Impact
An Equality Impact Assessment is not required as this report is to inform
Committee on legislation change. 
(h) Climate Change and Biodiversity Impacts
None arising directly from the report. 
(i) Consultations
Head of Education (Chief Education Officer), Continuous Improvement
Officer (West), Continuous Improvement Officer (East) and Business
Support Team Manager and Tracey Sutherland, Committee Services
Officer have been consulted and are in agreement with the contents of
this report as regards their respective responsibilities. 
4. CONCLUSION 
4.1 That the Committee scrutinise and note the contents of this report. 
Author of Report: Hazel Sly, Early Years Service Manager
Background Papers: https://www.gov.scot/publications/funded-early-learning-
and-childcare-places-joint-implementation-plan/ 
https://www.gov.scot/publications/early-learning-childcare-
statutory-guidance-july-2021/pages/9/ 
Ref: SPMAN-1315769894-394 
Page 299

Page 300

Page 300

Page 301

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE 19 APRIL 2023 
SUBJECT: INFORMATION REPORT: SINGLETON INSPECTIONS OF EARLY
LEARNING AND CHILDCARE CENTRES – PUBLISHED
REPORTS JUNE 2022 TO MARCH 2023 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the content of singleton inspection reports of Early
Learning and Childcare (ELC) centres by Care Inspectorate which were
published between June 2022 and March 2023. These were; 
Aberlour Nursery, Aberlour
Cullen Nursery, Cullen
Rainbow Childcare, Forres
Strathisla (FCSS) Nursery, Keith
Drumduan Kindergarten, Forres
Rothes Nursery, Rothes
The Cabin, Mortlach
Moray College, Elgin 
1.2 This report is submitted to Committee in terms of Section III (D) (1) of the
Council's Scheme of Administration relating to exercising the functions of the
Council as an Education Authority. 
2. BACKGROUND 
2.1 The Care Inspectorate carries out inspections of care services, including day
care of children’s services. Providers are inspected against a Framework of
Quality Themes and statements and the National Standard. 
2.2 The Care Inspectorate resumed face to face ELC scrutiny in Autumn 2021
after COVID-19 restrictions impacted on their work. 
2.3 The eight services noted are the first in Moray to have reports finalised and
published using the revised Care Inspectorate Quality Framework. 
Page 301

Page 302

2.4 Care Inspectorate Officers will grade services and publish these grades as
part of their duty to provide information to the public about the quality of care
services. 
The six point grading scale: 
6 excellent
5 very good
4 good
3 adequate
2       weak
1 unsatisfactory 
2.5 Following publication, inspection reports are available through ELC centres
and online at www.careinspectorate.com. 
2.6 The education authority will give guidance and support, as appropriate, to
both school nursery classes and partner providers of ELC education.
Following a Singleton Inspection the ELC centre is asked to prepare an action
plan indicating how they will address the main findings of the report, and to
share the plan with parents and carers. 
2.7 During this reporting period there were 9 Singleton Inspection reports
received. 
Name of Early Learning and Childcare Provider Date of Inspection
Aberlour Nursery, Aberlour 09.06.22 & 16.09.22
* Cullen Nursery, Cullen 24.06.22
Rainbow Childcare, Forres 29.06.22
Strathisla (FCSS) Nursery, Keith 04.08.22
Drumduan Kindergarten, Forres 06.10.22
* Rothes Nursery, Rothes 28.10.22
* The Cabin, Mortlach 01.11.22
* Moray College, Elgin 10.11.22 
2.8 The Gradings, Recommendations and Requirements arising from the reports
are summarised in Appendix 1. 
2.9 Services marked with a * received grades 4 or above which means they are
meeting the National Standard. These services continue to work in
partnership with Moray Council and have access to the Early Years Teaching
Team alongside their respective Continuous Improvement Officer. 
2.10 Services not yet reaching grades 4 or above are receiving support from the
respective Continuous Improvement Officer and the Early Years Teaching and
Learning Teacher to address the required actions resulting from the
recommendations or requirements. Recommendations are summarised in
Appendix 1.
Page 302

Page 303

2.11 The table below highlights the area where the grade(s) have dropped and the
planned improvement work to support ELC settings; 
ELC Setting Quality Framework
Area
Plans for
improvement/support
Aberlour Nursery,
Aberlour
How good is our
setting?
How good is our
leadership?
Support from a variety of
central officers to meet
initial requirements for
16.09.22. Please see
Appendix 1 for detail.
Postponed capital
investment works will
improve setting and
environment.
Rainbow Childcare,
Forres
How good is our care,
play and learning?
How good is our
leadership?
Ongoing support from
Teaching and Learning
team around self-
evaluation. Service based
training along with
manager attending Moray
training on self-
evaluation.
Robust staff observation
protocols in place to
support collegiate
discussion and staff
development.
Format developed, with
support from Teaching
and Learning team, to
improve quality
interactions and
progression of children.
Strathisla (FCSS)
Nursery, Keith
How good is our care,
play and learning?
How good is our staff
team?
Ongoing support from
Teaching and Learning
team ensures that quality
interactions are being
supported. This is being
monitored by the
manager and depute
manager through the self-
evaluation process.
Improved meal time
experiences through
collegiate working with
whole staff team.
Drumduan
Kindergarten, Forres
How good is our
leadership?
Support being provided
by both Continuous
Improvement Officer
West and Teaching and
Learning Team. 
Page 303

Page 304

Examples of good
practice documentation in
infection control policy is
being shared at staff
meetings.
Nursery manager is
working towards relevant
qualification with the goal
to be completed by June
2023. 
2.12 The current gradings of these services will not impact on their partnership
agreement with Moray Council to deliver funded Early Learning and Childcare
hours as we believe they have the capacity to improve. 
3. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
This report relates the priority ‘Provide a sustainable education service
aiming for excellence’ from the Corporate Plan and to ‘Building a better
future for our children and young people in Moray’ from the LOIP. 
(b) Policy and Legal
The Care Inspectorate inspects all registered services regulated under
the Public Services Reform (Scotland) Act 2010, which includes nursery
classes and playgroups. 
The authority has a duty to provide a quality early learning and childcare
place for every 3 and 4 year old whose parents wish it and for eligible 2
year olds. 
(c) Financial implications
None arising directly from the report. 
(d) Risk Implications
None arising directly from the report. 
(e) Staffing Implications
None arising directly from the report. 
(f) Property
None arising directly from the report. 
(g) Equalities/Socio Economic Impact
An Equality Impact Assessment is not required as this report is to inform
Committee on performance. 
(h) Climate Change and Biodiversity Impacts
None arising directly from the report.
Page 304

Page 305

(i) Consultations
Head of Education (Chief Education Officer), Continuous Improvement
Officer (West), Continuous Improvement Officer (East) and Principal
Teacher Early Years Education Service and Tracey Sutherland,
Committee Services Officer have been consulted and are in agreement
with the contents of this report as regards their respective
responsibilities. 
5. CONCLUSION 
5.1 That the Committee scrutinise and note the contents of this report. 
Author of Report: Hazel Sly, Early Years Service Manager 
Background Papers: 
Name of Early Learning and Childcare Provider
Aberlour Nursery, Aberlour
Cullen Nursery, Cullen
Rainbow Childcare, Forres
Strathisla (FCSS) Nursery, Keith
Drumduan Kindergarten, Forres
Rothes Nursery, Rothes
The Cabin, Mortlach
Moray College, Elgin  
Ref: SPMAN-1315769894-386 / SPMAN-1315769894-385
Page 305

Page 306

Page 306

Page 307

APPENDIX 1 
Summary of numbers of recommendations and requirements made to
providers. 
Name of Early Learning
and Childcare Provider
Areas for
Improvement
Requirements
Aberlour Nursery, Aberlour 0 2
Cullen Nursery, Cullen 0 0
Rainbow Childcare, Forres 3 0
Strathisla (FCSS) Nursery,
Keith
2 0
Drumduan Kindergarten,
Forres
1 1
Rothes Nursery, Rothes 0 0
The Cabin, Mortlach 0 0
Moray College, Elgin 0 0 
Details of gradings, recommendations and requirements made to providers. 
Aberlour Nursery, Aberlour
Unannounced 
Gradings
How Good Is Our Care, Play and Learning 4
How Good Is Our Setting 2
How Good Is Our Leadership 3
How Good Is Our Staff Team 4 
(N/A – Not Assessed) 
Areas for Improvement
• None 
Requirements
1. By 16 June the provider must ensure they keep children safe and healthy by
improving and maintaining the environment. To do this the provider must, at a
minimum: 
a) Deep clean the playroom, cloakroom area and toilets ensuring attention is paid
to floors, heater tops and toilets and ensure this is maintained. 
b) Ensure that the appropriate number of accessible toilets and sinks are available
for the children’s use. 
c) Dirty items such as rugs and cushions must be washed, removed or replaced. 
d) Ensure the entrance gate is safe and secure. 
e) Mops, buckets and other hazardous items must not be accessible to children 
2. By 16 June the provider must ensure that the safety, health and wellbeing of the
children is improved. To do this the provider must, at a minimum: 
a) Ensure that staff are knowledgeable in relation to safe record keeping and
administration of medication. 
b) Ensure all medicines are correctly stored and labelled, including any dispensing
labels. 
c) Ensure that corresponding records for medication is completed consistently.
Page 307

Page 308

All of these requirements were met and a re- inspection completed on 16th September
where the key messages were noted as; 
“We found that improvements had been made to the standards of cleanliness and
security measures, supporting the health, wellbeing and safety of children.
• Improved understanding of staff roles and responsibilities about the management of
medicines supported children to receive high quality care from staff who have the
necessary information, knowledge and resources.
• Children benefitted from being able to play, develop and learn in a clean, secure and
well maintained environment, with pleasant furnishings and equipment.” 
Cullen Nursery, Cullen
Unannounced 
Gradings
How Good Is Our Care, Play and Learning 5
How Good Is Our Setting 5
How Good Is Our Leadership 4
How Good Is Our Staff Team 4 
(N/A – Not Assessed) 
Areas for Improvement
• None 
Requirements
• None 
Rainbow Childcare, Forres
Unannounced 
Gradings
How Good Is Our Care, Play and Learning 3
How Good Is Our Setting 4
How Good Is Our Leadership 3
How Good Is Our Staff Team 4 
(N/A – Not Assessed) 
Areas for Improvement
• To support children's learning and development to enable them to reach their full
potential, staff should ensure they develop their knowledge and understanding of
quality interventions which enhance and extend learning.
• To keep children and families personal and confidential information protected, the
provider should ensure that there are safe and secure storage arrangement in
place.
• To support children to have consistently high quality experiences and positive
outcomes, the manager should have effective improvement planning in place.
Clear, robust self-evaluation and monitoring systems will help to form quality
assurance processes that support continuous improvement. 
Requirements
Page 308

Page 309

• None 
Strathisla (FCSS) Nursery, Keith
Unannounced 
Gradings
How Good Is Our Care, Play and Learning 3
How Good Is Our Setting 4
How Good Is Our Leadership 4
How Good Is Our Staff Team 3 
(N/A – Not Assessed) 
Area for Improvement
• To promote a consistently positive experience for children at mealtimes the
provider and manager should ensure that staff are focused on the children at these
times. This should provide opportunities for staff to sit with children and offer
support and promote opportunities for learning and development.
• To promote the opportunities for consistently good, nurturing interactions the
manager and provider should ensure that there are enough staff to nurture and
support children. 
Requirements
• None 
Drumduan Kindergarten, Forres
Unannounced 
Gradings
How Good Is Our Care, Play and Learning 4
How Good Is Our Setting 4
How Good Is Our Leadership 3
How Good Is Our Staff Team 4 
(N/A – Not Assessed) 
Area for Improvement
• To support children's health and wellbeing, the provider/manager should improve
nappy changing facilities and the toilet facilities in the after care setting. 
Requirements
• By 30 June 23, the provider must ensure that an appointed manager is fit to
manage the service and is able to support a strong ethos of continuous
improvement that enhances the delivery of high-quality practice leading to
improved outcomes for all. 
To do this the provider must: 
a) ensure that a manager holds a relevant practice qualification; 
b) ensure that the manager is registered with a professional body; and 
c) ensure that the manager is provided with the appropriate support to effectively
manage the service. 
Rothes Nursery, Rothes
Page 309

Page 310

Unannounced 
Gradings
How Good Is Our Care, Play and Learning 4
How Good Is Our Setting 4
How Good Is Our Leadership 4
How Good Is Our Staff Team 5 
(N/A – Not Assessed) 
Area for Improvement
• None 
Requirements
• None 
The Cabin, Mortlach
Unannounced 
Gradings
How Good Is Our Care, Play and Learning 4
How Good Is Our Setting 5
How Good Is Our Leadership 4
How Good Is Our Staff Team 4 
(N/A – Not Assessed) 
Area for Improvement
• None 
Requirements
• None 
Moray College, Elgin
Unannounced 
Gradings
How Good Is Our Care, Play and Learning 4
How Good Is Our Setting 4
How Good Is Our Leadership 4
How Good Is Our Staff Team 4 
(N/A – Not Assessed) 
Area for Improvement
• None 
Requirements
• None 
Page 310

Page 311

Page 311

Page 312

Page 312

Page 313

Amber - ongoing No colour – yet to be actioned
ECLS: ONGOING ACTIONS TABLE 
Date Agenda Item Action Required Allocated
to
Status
New work
Planned
Existing
Links (if any) to: 
Corporate Plan
Service Plan
LOIP 
Priority
1 = high 
2 = medium
3 =  low 
4 = ongoing 
5 = on hold
Estimated
Completion
Date
Notes: Progress Status 
25/01/2023 Free School Meals
Allowance
Secondary Pupils
iii) Consider a more flexible system when the
contract is being renewed.
Nicola
Moss
Planned - 4 December
2023 
14/12/2022 Performance Report
– Education
Resources and
Communities –
Period to 30
September 2022
NB: A breakdown of figures on the accredited
awards completed, other than the Duke of
Edinburgh Award Scheme.
Further information to be provided on the new
indicator to measure youth engagement and
participation.
Jo Shirriffs  Info - 3 June 2023 
14/12/2022 Education Revenue
Budget Monitoring to
30 September 2022
NB: Links to the previous Committee reports to
be circulated to members in regards to the
ELC overspend. 
Denise
Whitworth 
-  complete Action response submitted to Committee Services
11/01/2023: 
14 12 2022 ECLS
Action Response - ELC Overspend .msg
Action Closed
02/11/2022 17. ELC Major and
Minor Works
Further information to be provided on the toilet
projects at Findochty and St Peter’s nurseries.
Jennie
Ordonez 
Info - 3 April 2023 Projects at both Findochty and St Peter’s nurseries are
planned for summer holidays 2023 with the tender due
to go out shortly in order to ensure contractors are in
place.  Plan to complete works August 2023
Action Closed 