Education, Children's and Leisure Services Committee 
Tuesday, 13 May 2025 
NOTICE IS HEREBY GIVEN that a Meeting of the Education, Children's and Leisure
Services Committee is to be held at Council Chambers, Council Office, High Street,
Elgin, IV30 1BX on Tuesday, 13 May 2025 at 09:30. 
BUSINESS 
1. Sederunt 
2. Declaration of Group Decisions and Members Interests * 
3. Resolution
Consider, and if so decide, adopt the following resolution:
"That under Section 50A (4) and (5) of the Local Government (Scotland)
Act 1973, as amended, the public and media representatives be
excluded from the meeting for Items 28, 29 and 30 of business on the
grounds that it involves the likely disclosure of exempt information of the
class described in the relevant Paragraphs of Part 1 of Schedule 7A of
the Act.”   
4. Minutes of meeting of 18 February 2025
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
9 - 14
5. Written Questions ** 
6.* Our Moray Literacy Strategy
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
15 - 50
7.* Additional Support Needs Review - Update on Progress
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
51 - 58
Page 1

Page 2

8.* Thematic Inspection - Local Authority Approaches to
Supporting School Improvement
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
59 - 76
9.* Mobile Phone Usage in Schools
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
77 - 92
10.* Closure of Crossroads Primary School – Statutory
Consultation
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
93 -
176
11.* Future Buckie High School Project Update
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
177 -
200
12.* Early Learning and Childcare – Sustainable Rate
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
201 -
206
13.* Singleton Inspections of Early Learning and Childcare
Centres - Published reports September 2024 to March 2025
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
207 -
228
14.* Education Scotland Inspection of Burghead Nursery
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
229 -
234
15.* Education Scotland Inspection of St Gerardine Primary
School
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
235 -
242
16.* Education Scotland Inspection of Burghead Primary
School
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
243 -
250
17.* Education Scotland Inspection of Mosstowie Primary
School
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
251 -
258
Page 2

Page 3

18.* Education Scotland Further Inspection (Continuing
Engagement) of Lhanbryde Primary School
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
259 -
268
19.* Analysis of Secondary School Leaver Attainment 2023-
2024
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
269 -
286
20.* Education and Education Resources and Communities
Capital Budget Monitoring Report to 31 March 2025
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
287 -
294
21.* Education Revenue Budget Monitoring to 31 March 2025
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
295 -
300
22.* Education Resources And Communities Revenue Budget
Monitoring to 31 March 2025
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
301 -
306
23.* Performance Report (Education) - Period to March 2025
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
307 -
314
24.* Performance Report (Education Resources and
Communities) - Period to March 2025
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
315 -
322
25.* Education, Communities and Organisational Development
Service Plans 2025/28: Education and Education
Resources and Communities
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
323 -
354
26.* Quarter 3 (October to December 2024) Performance Report
for Children and Families and Justice Social Work
Report by Interim Chief Social Work Officer/Head of Service
355 -
390
27.* Information Reports - if called in 
Page 3

Page 4

Item(s) which the Committee may wish to consider with
the Press and Public excluded   
28.* Update on Out of Area Budget for Education Services and
Children and Families and Justice Social Work [Para 7]
• 7. Information relating to the financial or business affairs of any
particular person(s) for any matters referred to in section 27(1) of the
Social Work (Scotland) Act 1968; 
29.* Milnes 5-18 Campus Pilot Update [Para 1]
• 1. Information relating to staffing matters; 
30.* Learning Estate Programme Update - Future Forres
Academy [Para 6]
• 6. Information relating to the financial or business affairs of any
particular person(s); 
Only items marked * can be considered and determined by
all members of the Committee   
Information Reports - Not for Discussion at this Meeting
Any member wishing to call in a noting or information report from one
meeting shall give notice to Committee Services at least 48 hours
before the meeting for which the report is published. The Notice shall
be countersigned by one other elected member and shall explain the
reason for call in including any action sought. 
Universal Free School Meals Implementation – Status
Update
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
391 -
398 
Community Learning and Development Strategic
Partnership Progress Visit Outcome 2025
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
399 -
404
Page 4

Page 5

Summary of Education, Children's and Leisure Services
Committee
To exercise all the functions of the Council as Education Authority
within the terms of relevant legislation with regard to school education,
nurseries and child care, Gaelic, children’s services, leisure, libraries
and museums, sport and the arts, CLD, life long learning, youth justice
and child protection.         
Watching the Meeting
You can watch the webcast live by going to: 
http://www.moray.gov.uk/moray_standard/page_43661.html    
Webcasts are available to view for 1 year following the meeting.  
You can also attend the meeting in person.  If you wish to attend
in person, please come to the High Street entrance door and a
member of staff will let you into the Chamber. 
Page 5

Page 6

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how the
individual or members of the group will vote on any item(s) of business on the
Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any relevant
and competent business within the specified remits not already on the agenda, to
the Chair provided it is received by the Proper Officer or Committee Services by 12
noon two working days prior to the day of the meeting.  A copy of any written
answer provided by the Chair will be published on the Council’s committee
management system by 4pm the day before the meeting.  The Member who has
put the question may, after the answer has been published, ask one
supplementary question directly related to the subject matter at the meeting, but
no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the consent
of the Chair. If a Member does not have the opportunity to put a supplementary
question because no time remains, then he or she can submit it in writing to the
Proper Officer who will arrange for a written answer to be provided within 7
working days. 
Page 6

Page 7

MORAY COUNCIL 
Education, Children's and Leisure Services Committee 
SEDERUNT 
Councillor Kathleen Robertson  (Chair)
Councillor Bridget Mustard  (Depute Chair)  
Councillor James  Allan  (Member)
Councillor John Cowe  (Member)
Councillor John Divers  (Member)
Councillor Amber Dunbar  (Member)
Councillor Juli Harris  (Member)
Councillor Sandy Keith  (Member)
Councillor Elaine Kirby  (Member)
Councillor Scott Lawrence  (Member)
Councillor Marc Macrae  (Member)
Councillor Paul McBain  (Member)
Councillor Shona Morrison  (Member)
Councillor Derek Ross  (Member)
Councillor Sonya Warren  (Member)  
Mrs Sheila Brumby  (Non-Voting Member)
Mrs Anne Currie  (Non-Voting Member)
Ms Jillian MacKellar  (Non-Voting Member)
Mr Ruaridh Murray  (Non-Voting Member)
Reverend Tembu Rongong  (Non-Voting Member)
Mrs Susan Slater  (Non-Voting Member)
Mrs Emma Tunnard  (Non-Voting Member)
Clerk Name: Caroline O'Connor
Clerk Telephone: 07779 999296
Clerk Email: committee.services@moray.gov.uk 
Page 7

Page 8

Page 8

Page 9

MORAY COUNCIL 
Minute of Meeting of the Education, Children's and Leisure Services
Committee 
Tuesday, 18 February 2025 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor James  Allan, Mrs Sheila Brumby, Councillor John Cowe, Mrs Anne
Currie, Councillor John Divers, Councillor Sandy Keith, Councillor Elaine Kirby,
Councillor Scott Lawrence, Councillor Marc Macrae, Councillor Paul McBain,
Councillor Shona Morrison, Councillor Bridget Mustard, Councillor Kathleen
Robertson, Councillor Derek Ross, Mrs Susan Slater, Councillor Sonya Warren 
APOLOGIES 
Councillor Juli Harris, Ms Jillian MacKellar, Mr Ruaridh Murray, Reverend Tembu
Rongong, Mrs Emma Tunnard 
IN ATTENDANCE 
Depute Chief Executive (Education, Communities and Organisational
Development); Interim Chief Social Work Officer and Head of Service; Head of
Education; Early Years Service Manager; Quality Improvement Manager; Head of
Human Resources, ICT and Organisational Development; ICT Manager
(Infrastructure); Head of Governance, Strategy and Performance; Senior Solicitor
(Litigation and Social Care) and Caroline O'Connor, Committee Services Officer. 
ALSO IN ATTENDANCE
Councillor Amber Dunbar, Councillor Tracy Colyer 
1.         Chair 
The meeting was chaired by Councillor Kathleen Robertson.  
2.         Welcome 
The Committee joined the Chair in welcoming Will Angus, new local democratic
reporter to his first meeting.  
3.         Declaration of Group Decisions and Members Interests * 
In terms of Standing Orders 21 and 23 and the Councillors' Code of Conduct, there
were no declarations from Group Leaders or Spokespersons in regard to any prior
decisions taken on how Members will vote on any item on the agenda or any
declarations of Member's interests in respect of any item on the agenda.  
4.         Minutes of meeting of 26 November 2024 
The minutes of the meeting of the Education, Children's and Leisure Services
Committee dated 26 November 2024 were submitted and approved.
Item 4.
Page 9

Page 10

5.         Written Questions ** 
The Committee noted that no written questions had been submitted.  
6.         Quarter 2 (July to September 2024) Performance Report for Children
and Families and Justice Services 
The meeting had before it a report by the Chief Social Work Officer informing the
Committee on Children and Families and Justice Social Work performance as at
Quarter 2.  
Councillor Morrison, noting The Promise is celebrating its five year anniversary,
asked what impact The Promise is having on young people's lives in Moray,
specifically the outcomes and proposed next steps. In response, the Interim Chief
Social Work Officer suggested, in order to provide greater detail, it would be
beneficial to hold a dedicated session including members of the Moray Integration
Joint Board on all the work done within the context of The Promise, both locally
and nationally. He confirmed significant progress had been made in Moray in
relation to how children and young people feel about the support and care
provided however noted work is still required nationally on a more consistent
approach in all areas, eg early child attachment.  The Chair further suggested it
would be useful to invite the Community Planning Partnership to the dedicated
session to include other agencies also involved in The Promise.  
In response to a question from Councillor Mustard asking when the Out of Area
Placements report would come to Committee, as referred to in paragraph 9 of the
Minute of Meeting of 26 November 2024, the Interim Chief Social Work Officer
confirmed the report would come to the next Committee in May.    
Following consideration the Committee unanimously agreed to:- 
(i) note the performance of local indicators for Quarter 2 as presented in the
Performance Report at Appendix 1; and 
(ii) note the analysis of the local indicators as detailed in Appendix 1. 
7.         Education Revenue Budget Monitoring to 31 December 2024 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing the Committee of the
revenue budget position for Education as at 31 December 2024.  
Following consideration the Committee unanimously agreed to note the budget
position as at 31 December 2024.  
8.         Early Learning and Childcare - Primary 1 Admissions 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing the Committee of the
admissions policy surrounding early entry, deferral and exceptional deferral for
Early Learning and Childcare (ELC) children transitioning to Primary 1 (P1).  
In relation to the financial implications, Councillor Mustard asked for an update on
how many pupils per year are being deferred and what is the cost of the
Page 10

Page 11

deferrals.  In response, the Early Years Service Manager advised in 2022-23 there
were 136 children could do a standard deferral due to the date of birth which
increased in 2023-24 to 153 following legislation coming into force in August
2023.  The figures for 2024-25 increased to 201 and a similar incremental increase
was expected for 2025-26.  In relation to the costs of deferrals, the Early Years
Service Manager advised she would obtain figures from Accountancy and when
available, would share the information with Committee.    
Following consideration the Committee unanimously agreed:-  
(i) to note the contents of the report; and 
(ii) the guidance contained in Appendices 1 and 2 as the admissions policy
surrounding early entry, deferral and exceptional deferral.  
9.         Education Scotland Inspection of St Gerardine Nursery Lossiemouth 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing Committee of the
outcomes of the recently published report on a Moray Early Learning and
Childcare (ELC) setting following inspection by Education Scotland.  
Following consideration the Committee unanimously agreed to note the contents of
the report and findings of Education Scotland following their inspection.  
10.         Education Scotland Inspection of Findochty Primary School 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing Committee of the
outcomes on a Moray school following inspection by Education Scotland's His
Majesty's Inspectors of Education (HMIE). 
Following consideration the Committee unanimously agreed to note the contents of
the report and findings of Education Scotland HMIE following their inspection visit.  
11.         Initial Analysis of Achievement of Curriculum for Excellence Levels
2024 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) providing Committee with a
summary of the Moray data collected in June 2024 and provided to the Scottish
Government at the end of October 2024 regarding Teacher Professional
Judgements (TPJ) on children achieving Curriculum for Excellence levels (ACEL)
at P1, P4, P7 and S3. This data appears in the Scottish Government report
published in December 2024. 
Following consideration the Committee unanimously agreed to:-  
(i) note the content of this report; 
(ii) acknowledge work underway by Education and across our schools using
resources available in order to address identified areas of
underperformance and improve outcomes for all children and young people; 
Page 11

Page 12

(iii) note ACEL results for P1, P4, P7 and S3, improvement over time and
progress in relation to Stretch Aims set using available data intelligence, as
part of the Scottish Government and Education Scotland Framework for
Recovery and Accelerating Progress requirements; and 
(iv) note actions underway and planned in support of improving outcomes for all
learners and their ACEL achievement. 
12.         Additional Support Needs Allocations 
The Committee had before it a report advising Committee of the proposed
allocation methodology for Additional Support Needs (ASN) (teachers and support
staff) for session 2025/26.  
In response to a question from Councillor Mustard asking if if parents could be
advised of support arrangements within the school before the beginning of term,
the Head of Education advised regular child planning meetings are held with
parents so they know what support is in place and head teachers had previously
been reminded to inform parents about changes to allocations or changes to
support but she would issue another reminder to head teachers this year to inform
parents of any changes before the end of term.  
With reference to paragraph 3.15, Councillor Mustard asked if more information
could be shared with Committee on trends to help planning for the future.  In
response, the Head of Education advised the draft forecasting tool will help to
identify where there is a level of change in need requiring a significant shift in
resourcing.  This information would be used to ensure the schools have the
appropriate resources to meet local need.  She also confirmed a report would be
brought back to Committee detailing implications for the Council following
completion of the remoderation process in relation to development of a new
process for transfer of ASN funding from one school to another.  
Following consideration the Committee unanimously agreed:-  
(i) the methodology to be used for school ASN allocations; 
(ii) to note the work being carried out regarding nursery allocation and agree
with the proposal in paragraph 3.4; and 
(iii) to work continuing to develop a new process for ASN funding moving from
one school to another where there is a significant change in circumstances
and/or need.  
13         Education Resources and Communities Revenue Budget Monitoring
to 31 December 2024 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing Committee of the budget
position for Education Resources and Communities as at 31 December 2024.  
Following consideration the Committee unanimously agreed to note the budget
position as at 31 December 2024.  
14.         Education Resources and Communities and Education Capital
Budget Monitoring to 31 December 2024
Page 12

Page 13

The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing Committee of the capital
budget position for Education Resources and Communities and Education as at 31
December 2024.  
Councillor Warren asked for an update on the plan for Buckie High School and
whether it would be possible to pivot to a new build should any new funding come
forward from the Scottish Government.   In response, the Programme Manager
(Learning Estate) advised prior to the reduction in the capital budget a hybrid
option for new build and refurbishment had been considered and he would share
the details of the costs offline as they were commercially sensitive.  He further
confirmed it was not known what the Scottish Government's potential investment
may be in the next administration however, following the reduction in the capital
budget agreed by the Council in January, the team were in the process of
reassessing work required to address issues of condition in the school and more
detailed information in terms of short, medium and long term options would be
reported back to the next Committee in May.  
In response to a question from Councillor Kirby asking which primary schools
would benefit from the further equipment in kitchens and increased capacity in
dining areas referenced in paragraph 4.28, the Programme Manager (Learning
Estate) confirmed, whilst he did not have the detail to hand, there was a significant
number of schools and he would arrange to share the definitive list with Committee
following the meeting.  
Following consideration the Committee unanimously agreed to note the capital
budget position as at 31 December 2024. 
15.         Learning Estate Working Group 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing the Committee of the
progress made by the Learning Estate Working Group and its recommendations to
Committee.  
Following consideration the Committee unanimously agreed to:-  
(i) note the progress made the Learning Estate Working Group; and 
(ii) proceed without acceleration of the planned approach to the Learning
Estate Strategy and to review the policies associated with the future
learning estate work as set out in the report.  
16.         Education Digital Infrastructure Readiness Update 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing the Committee of
progress on development of the schools ICT infrastructure to ensure readiness for
digital development.  
The Head of Human Resources, ICT and Organisational Development provided a
verbal update on areas that had progressed since the report was written, namely in
relation to the SWAN contract referenced in paragraph 3.13 and the impact of work
undertaken to date in relation to education connectivity issues.
Page 13

Page 14

Following consideration the Committee unanimously agreed to:-  
(i) note the progress on the procurement and implementation of the Mobile
Device Management (MDM) system and that the expected completion date
of the project is now 30 April 2025; 
(ii) note that the licensing model for the MDM system has change to a
perpetual based model, meaning that the total project cost is contained
within the year 1 allocation, with no recurring costs thereafter, other than
licences for additional devices; 
(iii) note the update on the Scottish Wide Area Network (SWAN) programme;
and 
(iv) note that a further progress report will be brought forward to this Committee
in September 2025.   
Page 14

Page 15

Report to: Education, Children’s and
Leisure Services Committee
Meeting Date: 13 May 2025      
Report by: Depute Chief Executive
(Education, Communities
and Organisational
Development)
Report No: EDU021/25/CF/AB/AMB      
Author:  Craig Fowler 
Audrey Buchanan 
Contact Email: education@moray.gov.uk 
Subject: Our Moray Literacy Strategy 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to ask the Committee to note and adopt the implementation
and further development of Our Moray Literacy Strategy 2025-2029, which has been
collaboratively developed to achieve high standards in literacy outcomes for all children
and young people in Moray.  
1.2  This report is submitted to Committee in terms of Section III (D) (1) of the Council’s
Scheme of Administration relating to exercising all of the functions
of the Council as Education Authority within the terms of relevant legislation
with regard to nursery, primary and secondary education. 
2.  SUMMARY  
2.1  This report is to inform Committee that Our Moray Literacy Strategy has been developed,
and of the intention to implement this comprehensive document to improve literacy
outcomes for our children, young people and communities across Moray. 
Item 6.*
Page 15

Page 16

Our Moray Literacy Strategy - Overview 
3.  RECOMMENDATIONS  
3.1  It is recommended that Committee:   
i)  Adopts Our Moray Literacy Strategy as the guiding document for progression
in literacy education across Moray; 
ii)  Scrutinises and notes the contents of the Our Moray Literacy Strategy; and 
iii)  Approves that Our Moray Literacy Strategy will ensure consistency of
approach by schools in order to attain high standards in literacy for Moray’s
children and young people across the authority.   
Craig Fowler                                         Principal Educational Psychologist
Audrey Buchanan                             Quality Improvement Officer    
Page 16

Page 17

4.  BACKGROUND AND CONTEXT  
4.1  The Moray Improvement Group (MIG) 3 – Literacy, was established in academic session
2023-2024, alongside several other MIGs. The aim of MIG 3 – Literacy, was to
collaboratively develop a Literacy Strategy for Moray. The group met 6 weekly for the
duration of 2 hours per session and were provided with the following Terms of Reference
(TORs); 
• Review existing school approaches to teaching of literacy and learner progression
in literacy
• Review evidence-based research approaches to teaching of literacy (Education
Endowment Foundation – research informed best practice guides)
• Look inwards and outwards for development of a Moray Literacy Strategy based on
research and good practice in Moray and across Scotland
• Identify professional learning opportunities, resources and teaching approaches in
support of the teaching of literacy
• Overview of Moray Literacy progressions in place, approaches and pathways
across schools. 
4.2  The following outcomes were identified and achieved during the development of the
strategy:  
1)  Moray Literacy Strategy, including Roles and Responsibility Audits, Action Plans,
and resources on SharePoint.
o Roles and Responsibility Audits for class teachers, additional support teachers,
librarians, senior leaderships teams and senior officers.
o There are four action plans within the strategy linked to the four outcomes; High-
Quality Curriculum Making, Evidence-Based Approaches (research informed
practice), Early Intervention and High Quality Assessment, Skilled Analysis of Data.
o Resources on SharePoint e.g. Our Moray Literacy, Learning, Teaching and
Assessment Framework (planning tools with links to national and local guidance
and resources). 
2)  Career-Long Professional learning is signposted in the weekly Head Teachers Briefing
and provided by Highland Literacy Officer, Children and Young People Improvement
Collaborative (CYPIC-National Writing Programme) and Education Scotland. This in
turn will have a positive outcome for learners. 
3)  Literacy Good Practice Guide (evidence-based approaches are detailed on the
infographic below). This is a suite of research informed approaches with supporting
resources to enable practitioners to embed good practice e.g. interventions,
assessment tools, information leaflets for parent/carers, and Emerging Literacy.  
4)  Teams Site for Networking. Microsoft teams site in Glow was created to allow schools
to network. This supports collaboration and sharing of practice.
Page 17

Page 18

4.3  The MIG 3 – Literacy group was led by two central officers and was comprised of
volunteers from Early Years, Primary, Secondary, Educational Psychology, Community
Learning and Development and Library Services. Involvement with Speech and Language
colleagues was sought from the very beginning, but this proved challenging due to
recruitment, retention and vacant management post issues. The interim SLT Lead was
approached for feedback/comment. Moray’s largest teaching union, EIS, was also
consulted throughout the duration of the MIG 3 – Literacy sessions. 
4.4  Over 6 weekly 2 hour sessions throughout the academic year driven by the practitioners
and facilitated by two Central Officers:
• The group addressed the 5 Terms Of Reference (TOR) over the regular 6 weekly
sessions.
• The group worked collaboratively, and colleagues identified the challenges that
they wished to see addressed through the Literacy Strategy.
Page 18

Page 19

• They identified challenges from their perspective as practitioners e.g.
inconsistencies, re-inventing the wheel and a desire to identify the best evidence-
based practice and opportunities to shared/build-on good practice.
• Through reviewing national and local resources, the group request was to have
accessible resources in SharePoint, quick links stored and downloads for easy
access.  
4.5  In order to realise our overarching literacy aim, “Attain high standards in literacy for
Moray’s children and young people”, there are four outcomes; 
1. High quality curriculum making 
2. Evidence based approaches 
3. Early interventions and high-quality assessment
4. Skilled analysis of data  
4.6  These four outcomes are achieved through the following 4 integrated themes;
1. Partnerships 
2. Moderation 
3. Tracking and monitoring
4. Self-evaluation 
For each of the four key outcomes and actions there are linked roles and responsibilities,
and action plans available for educational settings to self-evaluate against as part of wider
school improvement planning processes.  
4.7  Our Moray Literacy Strategy aligns with national education priorities and frameworks, such
as the Curriculum for Excellence (CfE) and the Scottish Government’s revised 2025
National Improvement Framework (NIF). It aims to close the literacy attainment gap and
address the varied needs of learners, particularly those at risk of not achieving their full
potential.  
4.8  Literacy is fundamental to all areas of learning, unlocking access to the wider curriculum
and laying the foundation for lifelong learning and work. The Scottish Government’s
'Getting It Right for Every Child' (GIRFEC) approach underscores the importance of literacy
in improving outcomes and supporting the wellbeing of children and young people across
the curriculum.  
4.9  In alignment with national priorities, Our Moray Literacy Strategy has been developed to
detail the improvements necessary to ensure every child in Moray achieves high standards
of literacy. The strategy reinforces our shared vision for Moray’s children and young people. 
4.10  Our four action plans for each of the four outcomes, detailed in 4.5 and 4.6, are for self-
evaluation, incorporate and utilise our current Moray resources e.g. Our Moray Standard,
AnalyseM, and the Moray Broad General Education (BGE) Tracking Language etc. These
four action plans for self-evaluation are provided in the strategy appendices and linked to
additional resources, stored in The Moray Toolkit. A Good Practice Guide (recommended
research informed practice), infographic in 4.2, for practitioners is included for
educational settings to use as part of wider school improvement planning processes.
Page 19

Page 20

4.11  A suggested whole school approach to implementing Our Moray Literacy Strategy is
detailed below;
1. Schools should refer to their Improvement Plan to identify literacy priorities.
2. Senior Leadership Team would read through Our Moray Literacy Strategy.
3. As appropriate schools should RAG rate each of the Four Action Plans to identify
strengths, resources to support priorities and areas for development.
4. As appropriate schools can RAG rate Roles and Responsibilities Audits to
identify strengths and areas for development.
5. Schools should read through Our Good Practice Guide (research informed
practice) to identify resources to support areas of priority in SIP.
6. School can copy and paste areas of development into the Moray Action Plan and
Reporting Template tied into school priority areas in SIP.
Detailed in the infographic below: 
4.12  The Strategy builds on and complements our, ‘Moray Literacy and English Learning,
Teaching and Assessment Framework,’ which informs high quality learning and teaching as
well as supporting transitions. It is underpinned by the Moray Assessment and Moderation
in Broad General Education and, ‘Our Moray Standard,’ the learning and teaching strategy
for Moray.  
4.13  The Literacy Strategy details the key outcomes to be achieved (see infographic 2.1), to get it
right for every child in Moray; a high-quality curriculum, evidence-based approaches, early
intervention and high-quality assessment approaches combined with consistent skilled
analysis of a broad range of data to drive literacy improvements.  
4.14  Data trends in Moray - The key national and local data collections which monitor aspects
of literacy in Scotland are:
Page 20

Page 21

• National Standardised Assessments for Scotland (NSA) formerly Scottish National
Standardised Assessment for Scotland (SNSAs) and their Gaelic equivalent
(MCNG). 
• Achievement of Curriculum for Excellence (CfE) Levels (ACEL). 
Improvements are noted within key literacy elements in 2024 from 2023 in Moray
(Committee Report - 18 February 2025), identified for P1, P4, P7 and S3 for Literacy
(Reading, Writing, Listening and Talking) – Initial Analysis of Achievement of Curriculum for
Excellence Levels 2024 (see paragraphs 3.13 – 5.0). Our Moray Literacy Strategy has clear
identified outcomes, resources and a Good Practice Guide to support colleagues in
meeting those outcomes with the aim of continuing a positive trend in raising attainment
in literacy across the authority. 
4.15  Schools should start to engage with the strategy in line with their School Improvement
Plans to inform their school approach to literacy and identify strengths and next steps.  
4.16  The Good Practice Guide sits alongside the strategy and is a separate working document,
detailing planning, evidence-based approaches, tracking tools, assessments,
interventions and will be updated periodically, in line with new national and local
guidance.  
4.17  Implementation will further be supported through resources stored in the Moray Toolkit. 
4.18  A suggested whole school approach to implementing Our Moray Literacy Strategy is
detailed below in the info graphic. 
5.  PROPOSALS  
5.1  It is proposed that the adoption of Our Moray Literacy Strategy represents a significant
step forward in our commitment to raising literacy standards for all children and young
people in Moray. 
Page 21

Page 22

5.2  It is proposed by approving this strategy, Committee will endorse a comprehensive
document designed to enhance literacy outcomes and support the broader educational
aspirations of our communities.   
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) ✓ 
Policy and Legal ✓ 
Financial  ✓
Risk ✓ 
Staffing  ✓
Best Value and Transformation ✓ 
Property  ✓
Information Communications Technology/Digital ✓ 
Equalities. Social Inclusion and Economic Impact  ✓ 
Climate Change and Biodiversity Impact  ✓ 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population   
6.3  Policy and Legal 
It is the duty of the Council to secure improvement and the quality of school education
which is provided in schools managed by Headteachers and to raise standards of
education (Section 7, 8 of Standards in Scotland’s Schools etc Act 2000).  
6.4  Financial
Page 22

Page 23

There are no financial implications arising directly from this report. 
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend this
Year
Virement
From
Other
Comments     
N/A 
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments     
N/A 
6.5  Risk 
Inconsistent and inequitable access to Council networks could be a risk in accessing the
strategy, resources and associated good practice guides through GLOW and SharePoint.
SLTs within education settings not consistently implementing the strategy is another risk.   
6.6  Staffing 
There are no staffing implications.  
6.7  Best Value and Transformation 
This strategy was developed by the workforce for the workforce and brings together current
research and good practice nationally and locally. There was no cost involved in liaising
with literacy specialists out with and within Moray. Highland Council Literacy
Development Officer initially supported by attending the initial MIG 3 – Literacy session
and has granted full access to a suit of good practice resources and materials. This has
saved a significant amount of Moray workforce time by not having to replicate work that
has already been developed in a neighbouring authority. This collegiate approach is time
and resource efficient. 
6.8  Property 
There are no property implications arising directly from this report  
6.9  Information Communications/Technology/Digital 
Our Moray Literacy Strategy will be made available to colleagues through GLOW and
SharePoint, at their request, therefore good connectivity in our schools is essential. 
6.10  Equalities, Social Inclusion and Economic Impact 
Our Moray Literacy Strategy has been developed in order to reduce inequality in literacy
and improve social inclusion through increased literacy skills, access to and attainment in
literacy. This report aligns with the Strategic Priorities for Education and the National
Improvement Framework(NIF) which is aimed at reducing inequalities. An Integrated
Impact Assessment has been undertaken. Please see Appendix 2.
Page 23

Page 24

6.11  Climate Change and Biodiversity Impacts 
Our Moray Literacy Strategy is mainly a digital resource, accessible through GLOW and
SharePoint. This significantly reduces the need for printing documents for use in practice
as all can be downloaded and populated digitally.   
7.  CONSULTATION  
7.1  This report has been prepared in consultation with Head of Education (Chief Education
Officer), Quality Improvement Manager, Quality Improvement Officers, Principal
Educational Psychologist, Early Years Service Manager, Continuous Improvement Officers
(Early years) and Caroline O’Connor, Committee Services Officer are in agreement with
the contents of this report as regards their prospective responsibilities and any comments
made have been incorporated into the report. 
8.  BACKGROUND PAPERS  
8.1  Initial Analysis of Achievement of Curriculum for Excellence Levels 2024 Committee
Report - 18 February 2025
The Revised - 2025 National Improvement Framework 2025 National Improvement
Framework   
Page 24

Page 25

Literacy Strategy
Moray Council 2025-2029
Our
APPENDIX 1
Page 25

Page 26

Contents
Our 1
Introduction – how to use this strategy 4
Our vision for education in Moray 5
What is literacy and why does it matter? 6
Data trends in Scotland and Moray 7
National context – Scotland’s curriculum 8
The vision and priorities for education in Scotland – National Improvement
Framework 9
Our vision for education in Scotland: Excellence and Equity 9
Drivers of improvement in the National Improvement Framework 9
Partnership Working  10
Our Moray Literacy Good Practice Guide 11
Listening and Talking 11
Phonics into Reading (Decoding) 11
Phonics into spelling (Encoding) 11
Talking into writing 11
Our Moray Literacy Strategy Overarching Aim: 12
Links to National and Moray Policies, Guidance and Frameworks 12
Roles and Responsibilities  17
How Will We Implement Our Moray Literacy Strategy? 18
Appendices 19
2Page 26

Page 27

High Quality Curriculum Making
Evidence Based Approaches
Early Intervention and High Quality Assessment
Skilled Analysis of Data
Our Moray Literacy Strategy
overarching aim is:
‘Attain high standards
in literacy for Moray’s
children and young
people.’
Part ership   
Moderati on 
Tracking and Monitoring   
Self-Evaluati on
3Page 27

Page 28

Introduction – how to use this strategy
Our Moray Literacy Strategy provides an introduction, refers to, and is informed by national priorities,
policies, frameworks and guidance. The Scottish Government’s Getting It Right for Every Child
(GIRFEC) approach overarches everything that Government, public and voluntary services do
that impacts on children and young people. It is the national approach in Scotland to improving
outcomes and supporting the wellbeing of children and young people. Our Moray Literacy Strategy
details the improvements we are going to make to get it right for every child in Moray. It reinforces our
shared vision for Moray’s children and young people and aims to support the delivery of education
strategic priorities. Action plans for self-evaluation are provided and additional resources are
stored in The Moray Toolkit. A Good Practice Guide for practitioners is included in appendices for
educational settings to use as part of wider school improvement planning processes.
It has been developed collaboratively by the Moray Literacy Strategy Improvement Group established
in August 2023 with representation from Educational Psychology Services, Early Learning and
Childcare (ELC), Library Services, Community Learning and Development (CLD) Speech and
Language Therapy (SaLT), Primary and Secondary staff from across Moray, pupils and wider system.
Our Moray Literacy Strategy builds on and complements our Moray Literacy and English Learning,
Teaching and Assessment Framework which informs high quality learning and teaching as well as
supporting transitions. It is underpinned by the Moray Assessment and Moderation in BGE and ‘Our
Moray Standard,’ the learning and teaching strategy for Moray.
Our Literacy Strategy details the key outcomes we are going to achieve, to get it right for every child
in Moray; a high-quality curriculum, evidence-based approaches, early intervention and high-quality
assessment approaches combined with consistent skilled analysis of a broad range of data to drive
literacy improvements.
4Page 28

Page 29

Our vision for education in
Moray
Developing high standards of literacy in our
children and young people is essential to
enable full and active engagement in learning,
life and work. Literacy skills are fundamental
to all areas of learning and unlock the wider
curriculum.
“Our ability to use language lies at the
centre of the development and expression
of our emotions, our thinking, our learning
and our sense of personal identity.”
(Curriculum For Excellence, Literacy and
English, Principles and Practice, 2009) P1
Our Moray Literacy Strategy aligns with our
Educational Vision of:
“A better future for all Moray’s children.”
5Page 29

Page 30

What is literacy and why does it matter?
Literacy is defined in Curriculum for Excellence as, ‘the set of skills which allows an individual to
engage fully in society and in learning, through the different forms of language, and the range of texts,
which society values and finds useful.’
‘Language and literacy are of personal, social and economic importance. Our ability to use language
lies at the centre of the development and expression of our emotions, our thinking, our learning
and our sense of personal identity. Language is itself a key aspect of our culture. Through language,
children and young people can gain access to the literary heritage of humanity and develop their
appreciation of the richness and breadth of Scotland’s literary heritage. Children and young people
encounter, enjoy and learn from the diversity of language used in their homes, their communities, by
the media and by their peers.’
‘Competence and confidence in literacy, including competence in grammar, spelling and the spoken
word, are essential for progress in all areas of the curriculum. Because of this, all teachers have
responsibility for promoting language and literacy development. Every teacher in each area
of the curriculum needs to find opportunities to encourage young people to explain their thinking,
debate their ideas and read and write at a level which will help them to develop their language skills
further.’ Building the Curriculum 1
Furthermore, the Literacy and English: principles and practice paper outlines the importance of
literacy:
‘Literacy is fundamental to all areas of learning, as it unlocks access to the wider curriculum. Being
literate increases opportunities for the individual in all aspects of life, lays the foundations for lifelong
learning and work, and contributes strongly to the development of all four capacities of Curriculum
for Excellence.’
(Curriculum For Excellence, Literacy and English, Principles and Practice, 2009)
6Page 30

Page 31

Data trends in Scotland and
Moray
The key national and local data collections
which monitor aspects of literacy in Scotland
are:
• National Standardised Assessments for
Scotland (NSA) formerly Scottish National
Standardised Assessment for Scotland
(SNSAs) and their Gaelic equivalent
(MCNG).
• Achievement of Curriculum for Excellence
(CfE) Levels (ACEL).
A detailed analysis of Moray Council:
Achievement of Curriculum for Excellence
Levels 2024
The national data can be found in Appendix 2
“It would feel odd
not to read.”
7Page 31

Page 32

National context – Scotland’s
curriculum
Scotland’s curriculum places learners at the
heart of education. At its centre are the four
capacities – the purpose of our curriculum.
These capacities reflect and recognise the
lifelong nature of education and learning.
Our Moray Literacy Strategy outlines all staff
and practitioners have a responsibility to
support the development of literacy which
contributes strongly to the development of all
four capacities of Curriculum for Excellence.
Oracy and critical thinking must be central
to curriculum and pedagogies for literacy.
Given the speed and nature of advancing
technologies and its impact on how we
communicate, critical literacy in digital
texts should be a focus. Fundamental to our
approach is supporting all children and young
people to develop competence and confidence
within the tools for literacy.
8Page 32

Page 33

The vision and priorities for education in Scotland – National
Improvement Framework
“Literacy is the key to lifting children out of
poverty.”
– Sir Harry Burns, Chief Medical Officer for
Scotland 2005-2014
The National Improvement Framework sets out
the vision and priorities for Scottish education
that have been agreed across the system, and the
national improvement activity that needs to be
undertaken to help deliver those key priorities.
Our vision for education in Scotland:
Excellence and Equity
•  Excellence through raising attainment
and improving outcomes: ensuring that
every child and young person achieves the
highest standards in literacy and numeracy,
as well as the values, attitudes, knowledge
and skills necessary to shape a sustainable
future as successful learners, confident
individuals, responsible citizens, and
effective contributors.
•  Achieving equity: ensuring every child and
young person has the same opportunity
to succeed, no matter their background
or shared protected characteristics, with
a particular focus on closing the poverty
related attainment gap.
Drivers of improvement in the National
Improvement Framework
Our Literacy Strategy incorporates the key
drivers of improvement in line with the National
Improvement Framework.
“I’m able to communicate to
friends. We message and talk
to each other, and we know
each other better.”
9Page 33

Page 34

Partnership Working
We recognise that Education cannot fulfil our vision without strong partnerships with a range of
public sector, third sector and community organisations working together to achieve the best for
Moray’s children and young people. Working collaboratively, tapping into the strengths and assets
of the wider community is essential to the success of GIRFEC. Library Services, Educational
Psychological Services, UHI Moray, SaLT and Community Learning and Development as well as a
range of local and national partners all have a role in our Moray Literacy Strategy.
Meeting Support Needs in Literacy
“It is essential to remember that teaching methods addressing word reading and spelling
difficulties remain in essence the same whether or not the word ‘dyslexia’ is used’.” 
– Reason and Stothard, 2013
Many children develop literacy skills easily, whilst others experience varying degrees of difficulty
in acquiring either basic or more advanced levels of literacy. These children and young people can
be said to have additional support needs and will require more support than their peers in order to
progress. Difficulties in literacy can vary in a number of ways: which areas of literacy they affect; how
severe the needs are; the degree to which skills can be improved and difficulties overcome; and the
extent to which literacy difficulties are accompanied by other additional support needs.
The Meeting Support Needs handbook is a guide for Moray Educational Practitioners on where to
go in order to find comprehensive guidance for assessing and supporting literacy difficulties and
to know when it would be appropriate to identify literacy difficulties including dyslexia. Further
resources can be found in Our Moray Literacy Good Practice Guide in glow.
10Page 34

Page 35

Our Moray Literacy Good Practice Guide
Listening and Talking
• High quality interactions
• Oral language
• Explicitly teaching vocabulary
• Making links across the 4 contexts for
learning
Phonics into spelling (Encoding)
1. Phonological awareness:
• hear it, say the sound(s) – no visual
• stretch it, count sounds
• Make links to words with the same
sounds
2. Identifying grapheme(s), select letter(s)
3. Write word
4. Read work – decode
5. Grow it morphology / etymology
Talking into writing
• Handwriting
• Grammar and punctuation in context
• Gradual release of responsibility:
1. Stimulus
2. Dialogue
3. Model planning, drafting, revising,
editing and publishing as appropriate
developmentally
• Making links across the 4 contexts for
learning
Phonics into Reading (Decoding)
• 5 components of reading:
1. Phoneme awareness
2. Explicit and systematic teaching of
synthetic phonics
3. Vocabulary
4. Fluency
5. Comprehension strategies
• Building a reading culture
• Critical literacy and disciplinary literacy
• Making links across the 4 contexts for
learning
11Page 35

Page 36

“It helps me to
formulate my ideas
and value contributions
to discussions.”
Our Moray Literacy Strategy Overarching Aim:
In order to realise our overarching literacy aim, there are four outcomes;
• High quality curriculum making
•  Evidence based approaches
• Early interventions and high-quality assessment
• Skilled analysis of data
Subsequent agreed actions (are listed against each outcome on the following pages) and integrated
themes; listed below:
• Partnerships
• Moderation
• Tracking and monitoring
• Self-evaluation
Together the four outcomes, integrated themes and actions should inform daily work at authority
level, in our education settings and by everyone working and learning in our education communities.
Our Moray Literacy Good Practice Guide provides a range of resources, which schools are
empowered to use as part of wider school improvement planning to support a measured and
manageable approach to implementation.
Links to National and Moray Policies, Guidance
and Frameworks
Reflected in our Moray Literacy Strategy is our
collective commitment to the aims of National
and Moray policies, guidance, frameworks,
and strategic priorities, directing our approach
to improvement of literacy attainment and
achievement of Moray’s children and young
people in all our settings. Appendix 3
12Page 36

Page 37

Outcome 1 and Actions
High Quality Curriculum Making
Our literacy curriculum is
progressive, informed by Our Moray Standard
and Our Moray Literacy and English Learning
Teaching and Assessment Framework.
We communicate a clear strategy for raising
attainment in literacy across the community,
fostering high expectations for all and clear
roles and responsibilities.
Our strategy for raising attainment in literacy
details how we foster involvement and
engagement with families / carers with lifelong
literacy learning.
We work collaboratively with learners and
partners to review and improve the curriculum
to ensure it remains relevant for our current
learners, forward looking and cognisant of
future skills.
“If you can’t
read you miss
out lots of fun
stuff.”
Resources to Support
• Action Plan 1 High Quality Curriculum Making
• Roles and Responsibilities Audits
• Our Moray Literacy Good Practice Guide
• Meeting Support Needs Handbook
• Resources on SharePoint
• Our Moray Literacy Team Site
13Page 37

Page 38

Outcome 2 and Actions
High Quality Curriculum Making
Leadership is developed by
empowering the whole school community to
take ownership of their own literacy learning.
We adopt a practitioner enquiry-based
approach to ensure a positive impact on
learner literacy progress and attainment.
We work collaboratively to develop and
moderate evidence-based approaches to
literacy, ensuring excellence and equity for all.
We reflect on learning, teaching, and
assessment to identify strengths and areas
of improvement engaging with staff, learners,
parents / carers, and partners.
We engage with Our Moray Literacy Good
Practice Guide.
Resources to Support
• Action Plan 2-Evidence Based Approaches
• Our Moray Standard
• Our Moray Literacy Good Practice Guide
• Resources on SharePoint
• Our Moray Literacy Team Site
“Talking is important
as you have to able
to talk in front of
people to get jobs.” 
14Page 38

Page 39

Outcome 3 and Actions
Early Intervention and High Quality
Assessment
Our assessment overview details how we plan
and moderate assessment and report progress
to parents / carers.
We work collaboratively within our school,
Associated School Group, and across
Moray Council to agree standards of
achievement of a level, and utilise our school
QAMSOs.
We use assessment and tracking data to
inform our Moray BGE Tracking Language
and Progress and Achievement and utilise
AnalyseM.
We have clear strategies for delivering
excellence and equity for all our learners;
universal, and targeted interventions.
Resources to Support
• Action Plan 3-Early Intervention and High
Quality Assessment
• Our Moray Literacy Good Practice Guide
• Meeting Support Needs Handbook
• Progress and Achievement and AnalyseM
• Resources on SharePoint
• Our Moray Literacy Team Site
“It’s important to be
good at reading or you
could feel anxious reading
in front of others. You
wouldn’t know what to
do without reading.”
15Page 39

Page 40

Outcome 4 and Actions
Skilled Analysis of Data
We have processes in place
to gather a range of data to drive literacy
improvements through engaging with staff,
learners, parents / carers, and partners.
We have processes in place for consistent
transferring of literacy information – both
universal, and targeted  at transition points.
We skilfully analyse a wide range of data
utilising AnalyseM for continuous improvement
of literacy skills for all our learners.
“Being literate gives you
so many opportunities from
bettering your career to
being able to understand
culture and society.”
Resources to Support
• Action Plan 4-Skilled Analysis of Data
• Our Moray Literacy Good Practice Guide
• Resources on SharePoint
• Progress and Achievement and AnalyseM
• Our Moray Literacy Team Site
16Page 40

Page 41

Roles and Responsibilities
It is the responsibility of all to realise our aim,
outcomes and actions for Our Moray Literacy
Strategy.
Clear roles and responsibilities have been
identified in Appendix 4. All senior leadership
teams should ensure all those working with
learners have a clear understanding of their
role and responsibility in implementing Our
Moray Literacy Strategy. Through quality
assurance processes, senior leaders
provide support and challenge to evidence
improvements and areas of development to
ensure educational transition for our children
and young people is progressive and robust so
that literacy skills continue to develop, meeting
the needs of all children and young people.
“If you can’t read, you
can’t read good books. 
Good books spark your
imagination.”
“It gives you the opportunity to
include yourself in discussions.
If your taking social subjects,
it allows you to present
your arguments/points in a
manner that others will take
seriously.”
17Page 41

Page 42

How Will We Implement Our Moray Literacy Strategy?
Our Moray Literacy Strategy will be launched in session 2025-26 and schools should start to engage
with the strategy in line with their School Improvement Plans to inform their school approach to
literacy and identify strengths and next steps. For each of the four key outcomes and actions there
are linked roles and responsibilities, and action plans available for educational settings to self-
evaluation against as part of wider school improvement planning processes. The Good Practice
Guide sits alongside the strategy and is a separate working document, detailing planning, evidence-
based approaches, tracking tools, assessments, interventions and will be updated in line with new
national and local guidance. Implementation will further be supported through resources stored in
Our Moray Toolkit. To support collaborative ways of working including coordination with QAMSOs,
Our Moray Literacy Team Site has been established.
A suggested whole school approach to implementing Our Moray Literacy Strategy is detailed below.
Refer to School Improvement Plan to identify literacy priorities.
Senior Leadership Team read through Our Moray Literacy
Strategy.
As appropriate RAG rate each of the Four Action Plans to
identify strengths, resources to support priorities and areas for
development.
As appropriate RAG rate Roles and Responsibilities Audits to
identify strengths and areas for development.
Read through Our Good Practice Guide to identify resources
to support areas of priority in SIP.
Copy and paste areas of development into the Moray Action
Plan and Reporting Template tied into school priority areas in
SIP.
Our Moray Literacy Strategy
overarching aim is:
‘Attain high standards
in literacy for Moray’s
children and young
people.’
Part ership
Moderati on
Tracking and Monitoring 
Self-Evaluati on
18Page 42

Page 43

Appendices
Appendix 1
GIRFEC
Appendix 2
National Data
Appendix 3
Links to National and Moray Policies, Guidance
and Frameworks
Appendix 4 Roles and Responsibilities
Senior Officers
Senior Leadership Teams
Class and ASN Teachers
Role of Educational Psychologist
Role of Library Services and Librarian
Appendix 5 Implementation Action Plans
Action Plan 1
Action Plan 2
Action Plan 3
Action Plan 4
Appendix 6
Moray Action Plan and Reporting Template
Appendix 7
Glossary of Terms
19Page 43

Page 44

Page 44

Page 45

APPENDIX 2
SPFINANCE-565096732-34   28/04/2025 15:36
INTEGRATED IMPACT ASSESSMENT COVERING 
• EQUALITIES & SOCIO ECONOMIC DUTIES
• HUMAN RIGHTS AND RIGHTS OF THE CHILD 
DATE UPDATES/EXECUTIVE SUMMARY VERSION DETAILS
Insert Date
(e.g.
03/10/2023)
Add brief notes/highlight which section amended (e.g.
first draft of IIA completed and submitted to SFC
25/10/2023 for consideration; noting that further work
on Stage 2 will be required). 
Insert (ShP) Version Info
(when details have been
agreed) (e.g. 5.0 03/10/2023
11:21 AMcL)
14/04/25 First Draft of IIA completed V1   
STAGE 1 - DO I NEED AN INTEGRATED IMPACT ASSESSMENT?
Name of policy or proposal: Our Moray Literacy Strategy has been developed. 
Is this a  Mark X below
New activity, programme or policy? X
Change to an existing activity, programme or policy? 
Budget proposal? 
Duties - tick the boxes you think apply No Maybe                                                                                                                                             Yes
Equalities: Will your proposal have an impact on groups with
protected characteristics?
Consider the impact of your proposal on people and how they
access your services and information without barriers. 
X 
Socio-economic 
Not every person/family has access to regular income or savings.
Will your proposal have an adverse impact on them
X  
Does your proposal impact on the human rights of people?  X  
Does your proposal impact on the rights of children and young
people 
X  
Reasoning - Briefly describe your reasoning for the responses given above: 
Equalities: The implementation of Our Moray Literacy Strategy will support our children and
young people. Schools and teachers will access a wide range of resources and materials to
support the wide and varied needs of our pupil and parent/carer population. The strategy is
linked to our Moray progressions in literacy and a tool kit of materials and resources are
accessible to school staff in order to support and reduce/remove any barriers to the
development of literacy. 
Socio-Economic: The implementation of Our Moray Literacy Strategy will not negatively
affect any individual or family’s income or savings. 
Human Rights: The implementation of Our Moray Literacy Strategy will not negatively affect
any human rights of people.
Page 45

Page 46

APPENDIX 2
SPFINANCE-565096732-34   28/04/2025 15:36 
Rights of Children & Young People: It is hoped that the implementation of Our Moray
Literacy Strategy will support the rights of children and young people in their access to
literacy skills and support. 
If you have answered “maybe” or “yes” to any of the Stage 1 questions above then
proceed to complete the Stage 2 Integrated Impact Assessment questions below. 
If you have answered “no” to the Stage 1 questions above then provide the details below
and submit to [email]
Lead Officer  Vivienne Cross, Head of Education
Other people involved in the screening (this
may be council staff, partners 
or others i.e. contractor or community)
Craig Fowler, Principal Educational
Psychologist 
Date 14/04/25 
STAGE 2: INTEGRATED IMPACT ASSESSMENT
Please give a brief description of the affected service
1. Describe what the service does: 
Our Moray Literacy Strategy aims to improve literacy outcomes for our children, young people
and communities across Moray. Delivering this throughout our ELC settings and schools will
improve consistency in the development in literacy skills across Moray
2. Who are your main stakeholders? 
School leaders, teachers, school staff and pupils across Moray. 
3. What changes as a result of the proposals? Is the service reduced or removed?
Having our Moray Literacy Strategy implemented should further improve access to tools and
resources to assist teachers, school staff and parent/carers to meet the needs of our
children, young people and learning communities in a consistent manner, building on the
Moray learning progressions and evidence-based practice. The tools and resources provided
in the accompanying tool kit and practice guide should reduce the need for re-inventing the
wheel with access to tried and tested teaching methods and resources. 
There will be no reduction or removal of any services. 
4. How will this affect your customers?
In line with the Scottish Government’s 2025 National Improvement Framework (NIF) for
Scottish Education the implementation and delivery of the strategy should ensure every child
and young person in Moray will be supported to improve achievements in literacy through
embedding the rights of the child and closing the attainment gap (particularly poverty
related) between the most and least disadvantaged.  
5. Impact on staff providing the service
Teachers, ELC, school staff and other stakeholders involved in the development of Our Moray
Literacy Strategy asked for evidence based digital resources and tools to enable them to
Page 46

Page 47

APPENDIX 2
SPFINANCE-565096732-34   28/04/2025 15:36
further support the development of literacy skills across our ELCs and schools in Moray. They
requested a strategy that would also be supported with resources and tools to enable
teachers and school staff to consistently deliver a quality learning experience in literacy.
Highland Literacy Officer is extending access to a plethora of support materials via Highland
Literacy. This is intended to reduce teacher workload and pressure as all resources and
materials are located in the same digital space.   
6. Please indicate if these apply to any of the protected characteristics
Protected groups Potential impacts and considerations
Race  
Disability  Positive Impact - There is a significant number of
resources and materials specifically designed and
tailored to support pupils with additional support needs.  
Carers (for elderly, disabled or
minors) 
Sex 
Pregnancy and maternity (including
breastfeeding) 
Sexual orientation 
Age (include children, young people,
midlife and older people)
Positive Impact - The materials and resources cover the
age range 3-18 years.
Religion, and or belief 
Gender reassignment 
Inequalities arising from socio-
economic differences
Positive Impact – low-income households will benefit
and inequalities reduced 
Human rights
List of convention rights Describe, where applicable, if and how specific
rights are engaged
Article 5: Right to liberty and
security 
Article 6: Right to a fair trial 
Article 8: Right to respect for private
and family life, correspondence and
the home 
Article 10: Freedom of expression 
Article 11: Freedom of assembly
and association 
Article 12: Right to marry 
Article 14: Prohibition of
discrimination (in relation to the
convention rights) 
Page 47

Page 48

APPENDIX 2
SPFINANCE-565096732-34 28/04/2025 15:36
List of convention rights Describe, where applicable, if and how specific
rights are engaged
Article 1 of Protocol 1: Protection of
property
Article 2 of Protocol 1: Right to
education
Our Moray Literacy Strategy is intended to enable a
quality learning experience to our learners by
enabling and supporting school staff to assess and
meet literacy needs across Moray.
Article 3 of Protocol 1: Right to free
elections by secret ballot
Children’s Rights and Wellbeing
Relevant articles – UNCRC
Article 2 – Non discrimination Supports this right
Article 3.1 – Best interest of the child -
must be a top priority in all decisions and
actions that affect children.
Supports this right
Article 6.2 – Right to survival and
development
Supports this right
Article 12 – Respect of the views of the
child
Supports this right
Article 28 – Right to education – not to be
denied access to the existing educational
system
Supports this right
Article 31 – Right to leisure, play and
culture – promote the right of the child to
participate fully in cultural and artistic life
and shall encourage the provision of
appropriate and equal opportunities for
cultural, recreational and leisure activity.
Supports this right
7.Evidence. What information have you used to make your assessment?
Performance data INITIAL ANALYSIS OF ACHIEVEMENT OF CURRICULUM FOR
EXCELLENCE LEVELS 2024 Committee Report - 18 February 2025
Internal
consultation
Our Moray Literacy Strategy was developed collaboratively with ELC,
Teaching Staff (Primary and Secondary), Library, Community Learning
and Development Representatives, Educational Psychologists and
consultation was sought via Speech and Language  .
Consultation with
affected groups
Views of the children and young people were sought on what literacy
means to them.
Page 48

Page 49

APPENDIX 2
SPFINANCE-565096732-34 28/04/2025 15:36
Local statistics
National statistics
Other THE REVISED - 2025 NATIONAL IMPROVEMENT FRAMEWORK 2025
National Improvement Framework
8.Evidence gaps
Do you need additional information in order to complete the information in the previous
questions?
I think that the above local and national evidence is sufficient evidence. 
9.Mitigating action
Can the impact of the proposed policy/activity be mitigated?  Please explain 
N/A
10.Justification
If nothing can be done to reduce the negative impact(s) but the proposed policy/activity
must go ahead, what justification is there to continue with the change?  
N/A
SECTION 3 CONCLUDING THE IIA
1.No potential negative impacts on any of the protected groups were found. X
2. Positive potential impacts have been identified. The impacts relate to:
Reducing discrimination, harassment, victimisation or other conduct
prohibited under the Equality Act 2010
Promoting equality of opportunity Positive
Fostering good relations Positive
3.The proposals support human rights and/or the rights of the child Positive
4.Negative impacts can be mitigated as outlined in question 9
5.The negative impacts cannot be fully mitigated but are justified as outlined in
question 10
6.Further consultation with affected groups is needed.
7.It is advised not to go ahead with the proposals.
Decision - Set out the rationale for deciding whether or not to proceed with the
proposed actions:
It is recommended to implement the Our Moray Literacy Strategy due to the positive
impact(s) delivery will have in terms of addressing and / or minimising any existing
inequalities or disadvantage in relation to current attainment gaps.  
Date of Decision:
Page 49

Page 50

APPENDIX 2
SPFINANCE-565096732-34   28/04/2025 15:36
Sign off and authorisation: 
Service 
Department 
Policy/activity subject to IIA 
We have completed the integrated impact
assessment for this policy/activity. 
Name: Craig Fowler
Position: Principal Educational Psychologist
Date: 14th April 2025
Authorisation by head of service  Name: 
Position: 
Date: 
Permission to publish on website - 
Please return this form to the Equal Opportunities Officer, Chief Executive’s Office. 
Page 50

Page 51

Report to: Education, Children’s and
Leisure Services
Committee 
Meeting Date: 13 May 2025  
Report by: Depute Chief Executive
(Education, Communities
and Organisational
Development) 
Report No: EDU007/25/DD/JS/DD  
Author: Diane Douglas
Jackie Stevenson 
Contact Email: education@moray.gov.uk 
Subject: Additional Support Needs Review – Update on Progress 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to provide update on continued progress of the Additional
Support Needs (ASN) review. 
1.2  This report is submitted to Committee in terms of Section III (D) (27) of the Council's
Scheme of Administration relating to all the functions of the Council as an Education
Authority. 
2.  SUMMARY  
2.1  This report is to provide update on the Additional Support Needs (ASN) forecasting tool,
Early Years’ ASN funding allocation process, an update on staffing in the Flexible Learning
Resource (FLR), update on Moray Adapted Curriculum (MAC) and to note concerns around
Enhanced Provision capacity at Millbank Primary School and Elgin High School. 
3.  RECOMMENDATIONS  
3.1  It is recommended that Committee:   
i)  Consider and note the proposed ASN forecasting tool; 
ii)  Consider and note the work progress regarding Early Years’ ASN allocation
and agree to a further report to update Committee on the position with this
moving forwards;
Item 7.*
Page 51

Page 52

iii)  Consider and note the update on the Flexible Learning Resource; 
iv) Consider and note the update on Moray Adapted Curriculum; and 
v) Consider and note concerns around Enhanced Provision Capacity at Millbank
Primary School and Elgin High School.  
Diane Douglas, Quality Improvement Officer (Additional Support Needs)
Jackie Stevenson, Head Teacher (Moray SEBN Service) 
4.  BACKGROUND AND CONTEXT
4.1  The review of ASN in the Council has been ongoing for some time with various reports to
Committee. A report was presented to this Committee on 18 February to advise
Committee of the proposed allocation methodology for ASN (teachers and support staff)
for session 2025-26.  Committee agreed to the funding for ASN being maintained at the
same level as 2024-25, taking into account pay awards allocated. The allocations are
based on the extensive 2023/24 moderation exercise, awareness of change of need across
the year, ASN Resource Group (ARG) requests in 2024-25 and re-moderation information.
Re-moderation commenced in February 2025, with 15 schools being re-moderated by the
end of term. All schools were advised of their allocation when they returned in term 4. 
ASN Forecasting Tool
4.2  Last year, an in-person ASN moderation took place to more robustly understand the level
of ASN in all settings.  The information derived from this moderation formed the basis of
the allocation for session 2024-25 and has been used to support the development of an
ASN forecasting tool. 
4.3  Levels of additional support need across the authority have been recorded since 2022;
however, data before 2024-25 was not robustly moderated in person. The level of need
observed was categorised and weighted, where the highest level of need received a higher
weighting. This allows the service to understand the impact of the ASN in the school
context and within a school roll.  For example, a school may have a weighted ASN of 50
and a school roll of 300 which would give a percentage of weighted ASN of 16%, whereas a
school where they have a weighted of ASN of 50 and a school roll of 100, the percentage of
ASN would be 50%.  This has allowed the service to rate the level of ASN in schools.  This
has now been calculated and tracked in an ASN forecasting tool to look at trends and
patterns. The forecasting tool can resemble the school roll forecasting tool but giving a
weighted proportion of ASN. However, there are many variables which can impact
predictions of this nature, including placing requests and new to area. With the more
detailed data held centrally, it is possible to provide different predictions but the data will
have to be manipulated manually. 
4.4  Forecasts for 2025-26 will be verified as part of the forecasting testing work with in-person
moderation work which has already commenced in Early Years and School settings. 
Early Years’ Funding Allocation
4.5  It was recognised during session 2024-25 that the methodology used for moderation in
Early Years’ settings and schools did not work as effectively in the Early Years’ settings.  In
addition, the needs of younger children change at a faster rate which meant that the level
Page 52

Page 53

of allocation did not always match the needs observed later in the year.  This resulted in
settings either receiving an allocation which was either too great or too small. It has also
been acknowledged that there is to be a shared understanding of ASN as well as age and
stage appropriate developmental needs across the authority. A short life working group
was formed with the Early Learning and Childcare (ELC) Service Manager, Quality
Improvement Officer (ASN) and representatives from ELC settings (both Council and
private providers). This group has met on three occasions and has created a matrix for
Exceptional Support Needs which will cover the higher level of ASN within ELC.  In order to
better allocate resource for lower level of ASN need and developmental needs, the group
is currently developing a context driven element which will form part of the funding
allocation.  Allocations for ELC will be decided by the end of May 2025.
Funded provider and local authority allocations will be considered holistically.
Consideration will be given to funded provider payments to ensure their allocations are
reflective of National Insurance (NI) requirements and the imminent Local Government
Pay Award.   
Flexible Learning Resource (FLR) implementation update
4.6  The Moray FLR approach supports inclusive practice in schools. The service vision
includes FLRs in East and West Moray and one centrally.  FLRs support a number of
schools in an area where learners will remain on the roll of their registered school and
attend the FLR for part of the time.  FLR staff will liaise closely with the learners’ school.  It
supports learners, who are displaying behaviours that are of concern, in order that they
become self-aware, as well as self-regulating learners who have the skills to make good
choices. It also supports school staff to reflect on the school environment and curriculum,
and through staff observation, modelling and training. The FLR team of teachers and
support workers work in partnership with the learners’ base school staff to provide a
nurturing, inclusive and informed school experience for children and young people. 
4.7  The roll out of the FLR model continues to be compromised due to the high level of staff
absence in the former Autism Team and the failure to recruit staff for the Elgin Academy
Enhanced Provision. As a result of this situation the operational focus of the Central ASN
team continues to be the delivery of the Moray Adapted Curriculum Model (MAC) for
children and young people who are at risk of not being educated in Moray, and providing
staff cover for the Elgin Academy enhanced provision. This will continue to be the situation
until Elgin Academy successfully recruit permanent or temporary staff to the Enhanced
Provision posts. Once the Elgin Academy Enhanced Provision is fully staffed the Central
ASN team staff will be able to roll out the FLR model in Moray central. Due to current
restrictions on capital spend the opening of physical FLR spaces is on hold and the FLR
approach will instead by delivered peripatetically in Moray East and West as required. 
4.8  The ASN Change Management Plan (CMP) phases 1 and 2 have been fully costed and
Accountancy has confirmed that existing funding is sufficient to meet the cost of the
proposed operating model. Recruitment to the Phase 1 posts can now progress, and
recruitment to the Phase 2 posts will follow during the Phase 2 implementation phase in
June 2025. 
Flexible Framework: Curriculum for All
4.9  The Flexible Framework currently has 11 fully approved adapted curriculum providers
enrolled on it. There are a further 3 providers who have expressed an interest and are
working towards securing the necessary policies prior to final submission. The first
Page 53

Page 54

evaluation of the model is in process with providers and schools. To further promote the
Flexible Framework approach work is underway with the Council Communications team
to produce a promotional video and to host a Meet the Provider event. 
Moray Adapted Curriculum (MAC) update 
4.10  The MAC model is designed to support Primary and Secondary children and young people
who due to their variety and complexity of ASN are at risk of not being educated in Moray’s
mainstream setting through an inclusive adapted curriculum, or in an enhanced provision
setting. The overall aim of the MAC is to promote positive health and wellbeing and
engagement with learning to ensure the children and young people have the knowledge
and skills they need to be as independent as possible in learning, life and work.
Staffed by teachers and support workers MAC offers targeted skills-based wellbeing and
curricular opportunities that are creative, flexible and personalised to the child or young
person’s situation. This includes a health and wellbeing group, a Lifeskills group, and
personalised support for learning at a relevant level. The proportion of time children and
young people spend at MAC is planned through Child Planning and flexes in response to
their need and circumstance. Currently there are 14 children and young people supported
through MAC; 11 of the 14 were previously school non-attenders, 1 of them attends MAC
fulltime. MAC young people are support by the Moray Flexible Framework (Curriculum for
All) and there are currently 12 providers on this Framework. Schools can also access the
providers on the Framework. 
Enhanced Provision Capacity Concerns at Millbank Primary and Elgin High School
4.11  It should be noted that there is currently no formal method to measure physical capacity
within Moray enhanced provisions and when discussing capacity this report refers to
physical space rather than staffing ratios.  This is recognised as a challenge nationally and
work is currently underway to look at this on a wider scale. Officers are aware and
engaging with national discussions. 
Elgin High School
4.12  Prior to 2024-25, Elgin High School had the only enhanced provision within Elgin.  This has
led to all young people in Elgin whose needs require an enhanced provision having to
attend Elgin High School, thus pushing the capacity of the enhanced provision to its limit. 
During session 2024-25, B06, the autism unit situated in Elgin Academy, has become an
enhanced provision, to be managed by school staff. This will support the alleviation of
capacity issues at Elgin High School but due to the failure to recruit appropriate staff,
especially a Principal Teacher of ASN, this has been delayed.  This has resulted in Elgin
High enhanced provision being at such a level that some placing requests from out of
catchment will likely be turned down due to insufficient space. As previously stated, this
should be alleviated by the successful implementation of an Enhanced Provision at Elgin
Academy. 
Millbank Primary
4.13  The enhanced provision within Millbank Primary, the Bothy had reached its physical
capacity in session 2023/24.   In order to support this and with an increase in need at the
school,  an additional Enhanced Provision space was created within the mainstream area
of the school during session 2024/25 which has been named Bothy 2.  In addition, and
recognising the particular needs of children attending the school, a nurture space has also
been created which is impacting on the physical capacity of the school as well as general
purpose areas.   Officers and the senior leadership team of the school ascertained that it
Page 54

Page 55

was not possible to continue to provide a high quality, safe learning environment for the
amount of children in the Bothy and the adults required to support them. For session
2025-26, there are a further 11 young people in P1 who will require to access the
enhanced provision for a majority of their time in school, with only 2 leaving to go to
secondary.  For session 2026-27, the school is currently aware of 8 young people who are
likely to require the enhanced provision with only 1 leaving for secondary. The young
people are all from the Buckie Associated Schools Group (ASG) so Millbank Primary would
be their catchment enhanced provision school. If the trends continue in line with the ASN
forecasting tool, there will be a requirement to plan for further provision. For session 2025-
26, a Support for Learning space has been identified as an additional enhanced provision
space and has already had the adaptations required to ensure safety. While this has
reduced the current mainstream capacity, it has allowed for appropriate safe provision for
the young people requiring enhanced provision space.  During session 2026-27 data will
be regularly analysed and a further paper, outlining the options will be presented to
Committee, if required. 
Flexible Education:
4.14  The Flexible Education Policy will be presented to Committee after summer recess along
with other reports including the Home Education annual report.  It will contain details of
Moray’s approach to flexible learning, adapted timetables and Home Education. 
5.  PROPOSALS  
5.1  It is proposed that this paper will inform committee about the current updates of the ASN
review.  
5.2  It is proposed that this paper will raise awareness of initial concerns around enhanced
provision capacity concerns.  
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) x 
Policy and Legal x  
Financial  x
Risk x 
Staffing  x
Best Value and Transformation  x
Property  x
Information Communications Technology/Digital             x
Equalities. Social Inclusion and Economic Impact             x 
Climate Change and Biodiversity Impact  x 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Page 55

Page 56

Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☒ Improving wellbeing of our population   
6.3  Policy and Legal 
The Council has a statutory duty to make adequate and efficient provision for the
additional support required by each child or young person for whose school education it
has responsibility for, in term of the Education (Additional Support for Learning) (Scotland)
Act 2004. The ASN Review implementation is proceeding within the context of this
legislation and the recommendations of the Morgan Review.  
6.4  Financial 
There are no financial implications arising directly from this report where the ASN funding
has already been agreed at Committee. 
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend this
Year
Virement
From
Other
Comments       
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments       
6.5  Risk 
Forecasting tool – highlighting an increase of ASN across the authority which will have an
impact on funding and staffing implications.
ELC Allocations – level of need may be higher than anticipated thus having an impact on
funding and staffing implications.
FLR – continued difficulties in recruiting to positions in Elgin Academy enhanced provision
will further delay the roll out of the FLR model.
Page 56

Page 57

MAC – with an increase in higher level of need, this may have an impact on the capacity
within the provision.
Enhanced Provision Capacity – if need continues to rise as forecast, risk of capital spend
requirement in order to provide extensions to existing provisions.  
6.6  Staffing 
There are no staffing implications arising directly from this report.  
6.7  Best Value and Transformation 
There are no best value or transformation implications arising directly from this report.  
6.8  Property 
There are no property implications arising directly from this report. Any future impacts will
be reported to Committee for consideration.  
6.9  Information Communications/Technology/Digital 
There are no information communications, technology or digital implications.  
6.10  Equalities, Social Inclusion and Economic Impact 
This helps to better meet the requirements of ASN legislation in relation to providing full-
time educational input personalised to young people’s needs.  
6.11  Climate Change and Biodiversity Impacts 
There are no climate change and biodiversity impacts arising directly from this report. 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with Head of Education (Chief Education
Officer), Quality Improvement Manager, Early Years’ Service Manager, Quality
Improvement Officers, Chief Financial Officer and Caroline O’Connor, Committee
Services Officer are in agreement with the contents of this report as regards their
prospective responsibilities and any comments made have been incorporated into the
report. 
8.  BACKGROUND PAPERS  
8.1     
Page 57

Page 58

Page 58

Page 59

Report to: Education, Children’s and
Leisure Services
Committee
Meeting Date: 13 May 2025      
Report by: Depute Chief Executive,
(Education, Organisational
Development and
Communities)
Report No: EDU026/25/VC/VC      
Author: Vivienne Cross Contact Email: education@moray.gov.uk 
Subject: Thematic Inspection: Local Authority Approaches to Supporting School
Improvement 
1. PURPOSE 
☒ For Decision      ☐  For Information 
1.1 The purpose of this report is to note the report received from Education Scotland regarding
the national thematic inspection on local authority approaches to supporting school
improvement.  
1.2 This report is submitted to Committee in terms of Section III (D) (1) of the Council’s
Scheme of Administration relating to all the functions of the Council as an Education
Authority. 
2. SUMMARY  
2.1 His Majesty’s Chief Inspector of Education announced a national thematic inspection of
local authorities in Scotland and visited all 32 local authorities during September and
October 2024.  This report summarises the national report as well as provides Committee
with a copy of the Moray report and highlights. 
3. RECOMMENDATIONS  
3.1 It is recommended that Committee:   
i) Consider and notes the contents of the report at Appendix ; and   
ii) Agrees the actions arising for the service as a result of the thematic
inspection 
Item 8.*
Page 59

Page 60

Vivienne Cross
Head of Education (Chief Education Officer) 
4. BACKGROUND AND CONTEXT  
4.1 In June 2024, His Majesty’s Chief Inspector of Education announced a national thematic
inspection of local authorities in Scotland.  The focus of this thematic inspection was how
local authorities support schools to improve.  This inspection provided a timely
opportunity to reflect on the strengths, challenges and opportunities for ensuring high-
quality education for all learners.    
4.2 His Majesty’s Inspectors (HMI) visited all 32 local authorities during September and
October 2024.  They learned what was working well and heard about challenges that local
authorities encounter and improvements that need to be addressed to ensure
effectiveness across Scotland.  The Moray report is outlined in Appendix 1.  
4.3 HMI gathered evidence on the following themes:
• How local authorities support schools to improve the quality of Education through
implementing effective improvement planning and standards and quality reporting
• How local authorities support schools to improve the quality of education through self-
evaluation and quality assurance
• How local authorities support schools to improve the quality of education through
professional learning
• How local authorities deliver universal support and challenge for all schools, and
targeted support for specific schools to improve the quality of education   
Main messages and summary findings across Scotland
4.4 All local authorities provide guidance for self-evaluation, improvement planning and
standards reporting, often using standard templates, exemplars and timelines.    
4.5 Most authorities (including Moray) equip headteachers with a range of useful data (eg on
attainment and attendance) for self-evaluation and benchmarking.    
4.6 In most authorities, headteachers are engaged in worthwhile processes to collaborate and
share practice, often within clusters.  They help to improve the quality assurance and self-
evaluation approaches.  In Moray there has been a move away from Associated Schools’
Group (ASG) to Family Improvement Groups based on the feedback from Head Teachers
who wished to work with schools with a similar context and size to their own.   
4.7 Most authorities analyse school self-evaluation and improvement planning processes to
inform local priorities, professional learning needs and to identify targeted support for
individual schools.  The Service Plan, as a separate item on this Committee agenda, has
been informed by information gathered from schools as well as a range of data.  The
professional learning offer provided to schools is also updated using this information.  As
noted in the Moray report, targeted support to schools is informed by the currently
confidential risk matrix although there are plans for this to be shared more widely as noted
in 5.1 below.  
4.8 Budget cuts and fiscal challenges are a shared concern among all local authorities and
school leaders.  
Page 60

Page 61

4.9 Most local authorities have well established and well understood systems in place to
evaluate and monitor the performance and quality of education in schools, but they are
not always effective.  The majority of authorities should continue to develop robust ways
to evaluate the effectiveness of their school improvement strategies.  In Moray the Quality
Improvement Manager (QIM) has implemented a robust programme of development
activities for Quality Improvement Officers (QIOs) in order to ensure greater consistency in
approach.  In addition it was noted in the Moray report that school visit programmes varied
between primary and secondary.  This was necessary based on information gathered
regarding secondary schools and their attainment profiles.  The QIM will take the report
into consideration when compiling the programme for next year.  
4.10 In a minority of local authorities, strategic approaches are demonstrably improving
attainment and standards in learning, teaching, and assessment in primary schools, but
much less so in secondary schools.  In most authorities, there is a need to revisit the
principles of self-evaluation for improvement, so that this is well understood by school
leaders and staff at all levels, particularly secondary schools.  In Moray, there is
improvement across primary schools as evidenced in recent inspection reports however
this is not across all schools and the position locally echoes that of national where
improvement is required across secondary schools.  The service has already used a recent
strategic meeting to revisit self-evaluation principles and will continue to target schools
where improvement is required.  
4.11 A few local authorities have developed an effective system leadership approach across
their schools.  Many more local authorities are working towards this.  Where this approach
is effective, school leaders and their staff teams provide robust challenge and support to
one another.  They collaborate and share practice and feel empowered to lead and drive
educational change. Building capacity within school teams in using robust, data-driven
self-evaluation, strengthened by peer moderation, can help all local authorities to
continue to raise standards and produce better outcomes for children and young people,
despite diminishing budgets and numbers of officers in central teams.  This is the vision of
the service with the move to Family Improvement Groups and a growing number of Head
Teachers supporting and challenging colleagues at the request of the service.  
4.12 All local authorities provide a programme of universally accessible professional learning
opportunities for leaders and staff in schools.  The Moray programme is linked to the
staged intervention model with universal, universal with support and targeted support. 
Mandatory training was introduced this session aligned with improvement work around
Additional Support Needs and this has been welcomed by the system.   
4.13 Most local authorities have well-established or improving professional learning strategies
in place.  It was recognised that the service looks outwards and draws on expertise from
national organisations, including Education Scotland and other local authorities.    
4.14 Almost all local authorities actively encourage and promote the sharing of effective
practice among schools and build opportunities for this into meetings and networks.  Staff
engagement in network groups is customary practice in almost all local authorities.  The
service has many networks and also shares practice in a variety of ways including strategic
meetings, written and virtual briefings.  
4.15 A quarter of local authorities need to develop more rigorous and consistent approaches to
evaluating the impact of their professional learning strategies.  This should include
Page 61

Page 62

monitoring the effectiveness of professional learning on improving the quality of learning
and teaching and raising attainment, particularly in the secondary sector.  
4.16 All local authorities have a framework in place to support improvement in their schools.  In
most local authorities, these frameworks are clear, well established and embedded in
practice.  The service will continue to review and embed the framework and in particular
across secondary, hence the slight difference in approach to quality assurance visits.  
4.17 Local authority officers play a key role in the monitoring of school performance, identifying
risk and supporting change and improvement.  The QIO team under the leadership of the
QIM have worked hard to improve consistency in practice through a clear programme of
team professional learning activities.  
4.18 Almost all local authorities use an evidence-based approach to identify schools that
require targeted support. A few local authorities recognise the need to increase the
robustness of the procedures they use to identify schools requiring targeted support.  The
QIM has worked with the QIOs around the current risk assessment matrix.  
4.19 The recommendations from the National report are contained in Appendix 2 and the
service will continue to review the Moray Quality Improvement Framework (MQIF) and
approaches to improvement based on this with actions below. 
5. PROPOSALS  
5.1 Based on the evidence from the Moray report as well as the national thematic report, the
service will be sharing with Head Teachers the assessment of risk based on data, school
visits and documentation gathered. This will also be reported to Committee so that
members have an understanding of the universal and targeted support for schools for the
coming session.  
5.2 It is intended that Head Teachers will attend Committee in session 2025/26 when there is
an Inspection report published for their school.  
5.3 The MQIF will continue to be reviewed and updated in order to support schools to further
improve.  This will include further moderation within the central officer team to ensure that
consistency of support and challenge continues.  
5.4 The QIM will share the quality assurance visit programme with schools before the start of
session 2025/26.  
5.5 The Quality Improvement team will, using data and evidence available to them, target
schools where improvement is required to support their self-evaluation for self-
improvement processes.  Associate assessors, linked to each Family Improvement Group
will further support this.  
5.6 The service will continue its journey to be a self-improving system.  Working in the Family
Improvement Groups will support this. A number of Head Teachers and Depute Head
Teachers have been trained as Peer Reviewers and will be used in school reviews.  Once
this network includes all senior leaders from schools, the service will start to train
Principal Teachers and other colleagues to support this further.  The QIM and Head of
Education are working with peers in other local authorities which includes an
Page 62

Page 63

improvement Association of Directors of Education (ADES) Quad with East Lothian, Angus
and Argyll and Bute.  This network will be further enhanced when officers start to support
school reviews in other local authorities.  
5.7 The service will revisit its professional learning strategy to ensure that activities are
evaluated for impact in a consistent way. 
5.8 The risk assessment matrix will be refined further with schools informed of whether they
are categorised as universal, universal with support or targeted and this will be shared with
Committee. This will include clear action plans for those identified for targeted support.    
5.9 In order to support middle-leaders in secondary schools, secondary HTs are working with
Education Scotland on a bespoke package of professional development for middle leaders
with the first cohort of Principal Teachers currently working on this.  In addition, and
through the Northern Alliance collaboration, a secondary Head Teacher, Depute Head
Teacher and Principal Teacher will be engaging in learning sets aimed to supporting
leadership. The service will continue to consider professional learning programmes for
middle and senior leaders. 
6. SUMMARY OF IMPLICATIONS  
6.1 The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) x 
Policy and Legal x 
Financial  x
Risk x 
Staffing  x
Best Value and Transformation  x
Property  x
Information Communications Technology/Digital  x
Equalities. Social Inclusion and Economic Impact   x
Climate Change, Biodiversity and Sustainability  x 
6.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
local Outcomes Improvement Plan priorities:
Page 63

Page 64

☐ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population   
6.3 Policy and Legal 
The service as Education Authority must adhere to the Standards in Scotland’s Schools
etc Act 2000  whereby “the Education Authority shall endeavour to secure improvement in
the quality of school education which is provided in the schools managed by them; and
they shall exercise their functions in relation to such provision with a view to raising
standards of education.”  
6.4 Financial 
There are no financial implications arising directly from this report. 
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend this
Year
Virement
From
Other
Comments       
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments       
6.5 Risk 
There are no risks arising directly from this report however there are risks in terms of
securing improvement across schools which can be impacted on by the following:
• The size and composition of the central team as well as capacity given staffing issues
where they often support in schools detracting from their key role in school
improvement
• The ability to recruit to senior leadership roles in schools which is vital in order to
secure improvement and drive change.  This is particularly challenging across
Secondary schools with small numbers of people applying or posts being advertised
on several of occasions. In addition leets for Primary posts are small and it is very
difficult to recruit to denominational schools where discussions are ongoing with the
Church  
6.6 Staffing 
None  
6.7 Best Value and Transformation 
None  
6.8 Property 
None
Page 64

Page 65

6.9 Information Communications/Technology/Digital 
None arising directly from this report  
6.10 Equalities, Social Inclusion and Economic Impact 
None  
6.11 Climate Change and Biodiversity Impacts 
None 
7. CONSULTATION  
7.1 This report has been prepared in consultation with the Quality Improvement Manager,
Quality Improvement Officers and the Education Consultative Group and any comments
made have been incorporated into the report 
8. BACKGROUND PAPERS  
8.1 Local Authority Approaches to Supporting School Improvement
HMIe March 2025   
Page 65

Page 66

APPENDIX 1 
National Thematic Inspection: Local authority approaches to supporting
school improvement  
Summarised Findings 
Local Authority  Moray Council 
Lead HM Inspector   Ken McAra 
In September 2024, a team of inspectors from Education Scotland visited Moray
Council. During our visit, we talked to senior leaders, local authority officers,
parents/carers, headteachers, teachers, representatives from professional
associations and elected members.      
Purpose and themes  
The purpose of the visit was to gather evidence about how Moray Council supports
school improvement, with a focus on how they support schools to improve the quality
of education through:      
• the implementation of effective improvement planning and standards
and quality reporting  
• self- evaluation and quality assurance  
• professional learning  
• universal and targeted support and challenge     
Context of the local authority 
The Moray Council area is largely rural, with several larger towns in the north,
such as Elgin, Buckie and Lossiemouth.    
Three percent of children and young people in primary and secondary schools
live within deciles 1-2 of the Scottish Index of Multiple Deprivation (SIMD).     
Approximately 35% of children in primary schools and 49% of young people in
secondary schools have been assessed as requiring additional support with their
learning. 
In 2022/2023, the average attendance was 91.2%. The national average is 90.2%. 
In 2023/2024 in Moray Council, children and young people are educated across
44 primary schools, eight secondary schools, no specialist schools and 16
supported learning centres within mainstream schools. 
The senior officers are the Head of Education and the Quality Improvement
Manager (QIM). There are five centrally based quality improvement officers (QIOs)
who work to support schools. 
Page 66

Page 67

APPENDIX 1
Schools are organised into local associated school groups (ASGs) and, more
recently, into family improvement groups with similar establishments. The
education department works closely with other authorities in the Northern Alliance
improvement collaborative. 
Theme 1 - How do local authorities support schools to improve the quality
of education through implementing effective improvement planning and
standards and quality reporting? 
• How clear and effective is the local authority’s arrangements and advice to schools on self
evaluation, improvement planning and standards and quality reporting?  
• How does the local authority ensure that schools’ self-evaluation is accurate, rigorous and
robust, based on reliable and comprehensive data and information?  
• In what ways does the local authority promote collaboration with all stakeholders, especially
learners, as essential to effective self-evaluation and identification of priorities?  
• What is the role of central teams in providing critical feedback to school leaders on the
quality/robustness of their self-evaluation and school improvement planning processes?  
• To what extent does the local authority use the data from individual school or cluster
improvement plans and standards and quality report, to direct their officers’ work? 
The Moray Quality Improvement Framework (MQIF) was developed by authority
officers in session 2022-23, following looking outwards across other local
authorities including the Northern Alliance regional improvement collaborative. All
of the processes already existed, having been developed by senior leaders over
the past four or five years. They have brought these together in a single
framework. The aim of senior authority leaders was to improve the consistency of
the work of the central team of officers in supporting school improvement. This
included developing consistent approaches to self-evaluation, improvement
planning and standards and quality reporting in schools. This publication has been
welcomed by headteachers, teachers, and QIOs as the overarching framework for
school improvement. It has been informed by local and national good practice
including Education Scotland advice notes and the outcomes from inspections. It
is updated on a regular basis. The central team, through planned professional
development sessions, has developed greater consistency in its approaches to
supporting school improvement along with school leaders’ use of evaluative
language. Headteachers report that they feel involved in the development of the
document and procedures. It provides them with clear and helpful advice on what
needs to be done and when. It also contains prompts and templates for
improvement activities in schools. Senior leaders refer to the framework at
strategic headteachers’ meetings across the year. 
Senior leaders in the authority are aware that more work needs to be done to
ensure that all documentation is consistently submitted by all headteachers in a
timely manner. Elected members are keen to understand the themes identified for
school improvement. The Headteachers’ Guide has been produced to give senior
leaders all of the information they need about contacts and documentation in one
place. There is separate Pupil Equity Funding (PEF) guidance and plan proforma.
These are scrutinised by authority officers working closely with the Attainment
Advisor. 
Page 67

Page 68

APPENDIX 1
Strategic meetings, which include headteachers, nursery managers and central
officers, agreed a thematic focus on support and inclusion last session. The
agreed theme for this session is leadership of change and driving improvement
across all schools. The central team has developed a How good is our school? 4th
edition (HGIOS4) ‘Health Check’ for schools. School leaders find these checks
helpful to reflect on their practice with staff. There is a greater understanding
across schools of quality indicators and expectations as a result of this. Quality
improvement officers engage with link schools on a regular basis to support and
challenge them. They triangulate school data with authority-wide data sets and
observe classes using the Moray Standard for learning and teaching. 
Through the MQIF, the authority is encouraging schools to seek and reflect the
voice of more children and young people. It is also encouraging them to seek the
voice of parents and carers, through increased engagement. Headteachers report
that this is a clear expectation, and that it is signposted in the guidelines and
paperwork relating to school improvement. However, Parent Council chairs who
spoke to HM Inspectors point out that this approach is inconsistent for parents.
Parents are given information by schools about documents such as the school
improvement plan but are not always consulted on it. Similarly, they do not always
have a role in considering or being consulted on the use of PEF. They note that
headteachers do not tend to discuss budgets with the Parent Council. They feel
that the Moray Parent Forum, which brought together chairs of Parent Councils
from across the authority, did not result in improvement, with issues raised not
always being addressed. Senior leaders in the authority have reviewed the Moray
Parent Forum based on feedback. They are aware that they need to work more
effectively with parents. School leaders have been working with children and
young people using the Education Scotland self-evaluation publication ‘How
Good Is OUR School?’ to enable them to give their views. Secondary pupils
previously attended the Education Committee to represent their peers.    
The central team of QIOs uses the school’s self-evaluation profile as a focus for
their visits and to identify next steps. Visits can include direct observation of
learning and teaching. Quality improvement officers talk to parents, pupils, and
other focus groups. Headteachers find that the written report which follows is
helpful and echoes what has been seen. They use the findings to inform their
school improvement plans. Quality improvement officers signpost schools towards
examples of interesting practice in other Moray schools, depending upon findings. 
The authority has commissioned ‘Analyse M,’ a primary-based tracking tool for the
broad general education (BGE). The secondary version is due to be launched and
should articulate with the primary version. Quality improvement officers have been
involved in meetings of associated school groups (ASGs) which agreed targets
together. These were often reflected in individual school improvement plans.
Quality improvement officers will be invited, as appropriate to their remit, to
meetings of the new Family Improvement Groups (FIGs). FIGs have been
designed for schools with similar characteristics to enable them to discuss issues
of common interest. School inspection reports are shared widely amongst elected
members. However, elected members feel they need to know more about the 
Page 68

Page 69

APPENDIX 1
impact of education in schools, including both attainment and achievement. 
Current committee reports from education officers are ‘snapshots’ and elected
members need more information about improvement. Parents would like to be
better informed by the authority about how central officers are contributing to
improving outcomes for children and young people. 
Centrally based officers have access to a range of data sets, including attainment
information, and a risk matrix of factors affecting individual schools. They use this
data to inform support and training for schools. For example, additional support
needs (ASN) training around meeting specific pupil needs was identified as a
priority. A core training offer was developed by officers, and rolled out from
August, to further enhance the understanding of all. Insight data has shown that
attainment in Moray schools is below its virtual comparator in most measures.
Centrally based officers now need to do more to support schools to improve
attainment. 
The central team is confident that it knows schools well. This is reflected in the
risk matrix, which is currently a confidential document. Senior leaders are aware
that the matrix should now be reconfigured in a form which can be shared with
schools and used to take forward improvement conversations. For example,
aspects of the current matrix include the subjective view of officers rather than
objective data. Elected members on the Education Committee could also find this
a helpful tool to understand the current context of each school. The Head of 
Education meets regularly with the chair and vice chair of the Education
Committee. Plans are in place for head teachers to attend committee to give their
perspective on inspection outcomes and attainment data. 
Theme 2:  How do local authorities support schools to improve the quality
of education through self-evaluation and quality assurance? 
• What methods does the local authority use to evaluate school performance (review the quality of
education) for example, gathering evidence from stakeholders, review/validated self-evaluation visits,
attainment analysis)? How effective are these methods? How often does this take place?  
• To what extent do officers carry out regular and rigorous evaluation of the quality of school provision?
How is this work quality assured?   
• How does the local authority evaluate the quality of learning, teaching and assessment?  
• How clear and effective is the advice and support for schools on approaches to self-evaluation and
their quality assurance? How effectively does the local authority moderate this at strategic and school
levels?  
• How does the local authority identify and share effective practice through quality assurance? Is this
making a difference across the authority?      
Senior officers work with Associate Assessors (AAs), for example, producing
guidance for schools to prepare them for inspection and to plan for improvement. 
The central team has also developed a How good is our school? 4th edition 
(HGIOS4) ‘Health Check’ for schools. Headteachers find it a very practical
approach which they can use to encourage all staff to reflect on their practice. The
health checks support school self-evaluation leading to the completion of the self-
evaluation profile. 
Page 69

Page 70

APPENDIX 1 
The Moray Standard for learning and teaching supports schools in developing
their own learning and teaching policy. Central officers have published a learning
and teaching toolkit and suite of observation resources to support schools. This
can be used to track observations and directly monitor learning and teaching. In
secondary schools, the data sets can be accessed by staff through the
‘Secondary Warehouse’ approach, which is electronic. In primary schools, the 
BGE Data Analysis and Dashboarding Tool, AnalyseM, can be accessed through
SEEMIS. This is used to analyse data extracted from SEEMIS to support
improvement. 
Senior leaders, working with the HT consultative group, gave schools access to
the publication “Power Up Your Pedagogy” when learning and teaching was
identified as an area for improvement. Implementation of this approach has been
positive in some schools and teachers are enthusiastic about its impact. There is
evidence of improvement in primary schools, but it is proving more of a challenge
in secondary schools. The authority is aware of the need for improved outcomes
and to build further leadership capacity in the secondary sector. All headteachers
have four strategic meetings each year with senior leaders, whilst secondary
headteachers have a further four. Secondary schools have had differential
engagement on their attainment at the beginning of the current session. Some
were invited for a discussion with the Deputy Chief Executive and senior officers
to discuss approaches to improvement in their schools and share their recovery
plans. Others had an attainment discussion by video-conference. Senior leaders
are aware that tracking in secondary schools needs to improve. As planned, the
QIM and QIOs will work with them to increase their capacity in this area. 
School visit programmes vary across sectors. In primary, the year begins with
looking at the school improvement plan. After that, QIOs conduct termly visits,
each of which has a particular focus. Targeted school visits are possible where a
need, such as improvement in attainment, is required. The Secondary School
Improvement Model (SSIM) is a core part of engagement with secondary schools.
This is an evidence-based approach, with teams of officers and peers coming into
schools to observe learning and speak to stakeholders. The written report
highlights key strengths and areas for improvement. This model is changing
following feedback. Senior officers will give middle leaders a bigger role in the
process. There needs to be greater clarity for senior leaders regarding the pattern
of visits across the session. 
Senior leaders are aware that there has been inconsistency of approach across
the QIO team. They have implemented team moderations, aimed at achieving a
consistent, standardised approach. 
QIOs quality assure the quality assurance calendars in schools to ensure that
these reflect the requirements in the MQIF. They also refer to the Moray Learning
and Teaching Standard when carrying out observations of learning in schools. The
QIM has responsibility for performance and improvement across primary and
secondary working with the quality improvement team. 
Headteachers have noted a clearer focus on evaluating impact over the past year.
The Education Scotland Attainment Advisor has provided professional 
Page 70

Page 71

APPENDIX 1
learning focused on more meaningful aims and impact measures at headteachers’
meetings.    
The local authority’s advice and support for schools on approaches to self
evaluation and quality assurance is very clear. Officers have produced a suite of
documents that provide templates and guidance. Headteachers agree that the
approaches and documents have become more streamlined and coherent in
recent years. Senior officers recognise the need to strengthen headteacher skills
and confidence in leading self-evaluation effectively and accurately. Headteachers
would welcome further sharing of effective approaches to self-evaluation in
schools. The local authority’s newly established FIGs and peer review programme
have the potential to support this.    
QIOs meet regularly as a team with the QIM to discuss and reflect on school
engagement. This provides an effective forum to moderate their standards and
expectations across the local authority. This is supporting the team’s development
and consistency in approaches to supporting and challenging individual schools.
QIOs also use these meetings to share effective practice which they have
observed first hand while in schools. They are using this knowledge to signpost
headteachers who request examples of good practice. 
The local authority has many networks where school staff share and hear about
effective practice and its impact on children and young people. Central staff
identify headteachers to present emerging or effective practice with their peers at
headteachers’ strategic meetings. Senior officers use weekly updates to
communicate across the local authority. This includes examples and celebration of
good practice. Headteachers value these opportunities to hear about the
implementation and impact of new initiatives and effective and embedded
practice. There is emerging evidence of positive impact from schools sharing
effective practice, following the local authority-wide focus on improving learning
and teaching. This includes promoting consistency of approaches and quality of
learning and teaching across schools and departments. The QIM will share
examples of good practice across schools. 
The local authority is at the early stages of implementing a self-improving system
approach using FIGs as part of universal support and challenge. Headteachers
are beginning to work together in these groups, which include associate
Assessors, to identify common areas for improvement. The local authority’s
expectation is that headteachers work collaboratively to lead and build capacity
for improvement across FIGs. There is significant potential to support school
improvement as a result of FIGs. Headteachers are enthusiastic about this new
approach. Currently, there is no evidence to evaluate the impact on school
improvement. The local authority has plans to develop and share with
headteachers a risk matrix format which will support and inform the effectiveness
of this approach further.    
Centrally based staff implemented Moray Improvement Groups (MIGs) last
session on a range of topics, including ASN support and interdisciplinary learning.
MIGs designed resources, but these have yet to be launched.      
Page 71

Page 72

APPENDIX 1  
Theme 3:  How do local authorities support schools to improve the quality of
education through professional learning? 
• What professional learning does the local authority currently provide to support school
improvement?   
• What is the impact of this on developing the skills and knowledge of school leaders and staff on
school improvement?   
• What support systems (e.g., mentoring, networks of practice, peer support groups, cluster support)
are available for school leaders and staff? How are these approaches improving school performance
and outcomes for learners?   
• To what extent do senior leaders have opportunities to support improvement beyond their own
establishment? What difference is this making?  
• How effectively does the local authority utilise Associate Assessors (if applicable) to support school
improvement across establishments.  
• Does the local authority’s professional learning strategy draw on support from national
organisations?    
The local authority provides a range of professional learning to support school
improvement. A QIO has overall responsibility for continued professional learning
and there are opportunities for all staff across the school system to engage in
these activities. The professional learning system is in a period of transition and is
currently migrating to the General Teaching Council for Scotland’s (GTCS) online
portal. Professional learning is based on the professional review and development
(PRD) process and all staff can request and book professional learning online.
The authority offers professional learning on school improvement planning to all
headteachers. Useful documentation has been produced to enhance further staff
skills and develop consistency in approaches across schools. Recruiting school
leaders remains a challenge for the local authority and, as a result, central team
officers have provided professional learning opportunities for aspiring
headteachers. Depute headteachers and middle leaders can engage in a range
of courses to support them on their journey. This includes Aspiring Middle
Leaders, Moray Education Management Programme and Moray Education
Leaders Programme. The last of these is accredited by the GTCS. Staff value
these opportunities.    
The senior education team is responsive to the needs of the service. As a result,
mandatory training is provided for all staff at the beginning of the session. The
Head of Service issues information on a weekly basis providing details of
professional learning that is available both locally and nationally. School leaders
welcome this information and share it with the wider staff in their schools. The
Headteacher Strategic Meetings incorporate professional learning which is led by
staff in the authority or national agencies, including Education Scotland. School
leaders report that professional learning and documentation are improving their
knowledge and skills. The newly formed FIGs have been created to align school
improvement and provide peer support.    
Professional reading is shared and promoted at all levels. Headteachers have the
autonomy to lead this in their own school. During school visits, QIOs monitor the
impact of these approaches; impact is variable. Although some staff recognise the
impact professional learning has on their practice, this is not consistent across all
schools. The senior leadership team regularly signposts staff to professional
learning opportunities. Depute headteachers support the delivery of the newly 
Page 72

Page 73

APPENDIX 1
qualified teachers programme. Headteachers participate in recruitment, and they
mentor newly appointed leaders. Secondary staff meet in subject network groups
on a regular basis. The impact of these groups has been reviewed and they now
have clear agendas. Some teachers engage in QAMSO training and support
moderation across the schools. School leaders in primary and secondary sectors
participate in ASGs, FIGs and MIGs to support improvement and performance
across schools. An experienced retired headteacher is an adviser to the authority
and provides bespoke support for some headteachers. This activity has had a
positive impact. 
Senior leaders have links with other local authorities across Scotland to support
improvement, including other members of the Northern Alliance. Classroom
teachers participate in the National Improvement Programme to raise attainment
in writing. The Head of Education leads a consultative group and provides
opportunities for staff to meet with her on an individual basis and discuss their own
context. 
There are several AAs across the primary and secondary sectors in the authority.
They are deployed by the authority to support improvement across
establishments. Each of the FIGs has an allocated AA to share knowledge and
expertise. The AAs, along with senior leaders, have created a suite of resources to
support improvement in secondary schools. During Strategic Headteacher
Meetings, they share key learning from inspection to support school improvement.    
The local authority looks outwards and draws on expertise from national
organisations, including Education Scotland and other local authorities. The
documentation, which has been created by senior officers to increase school
performance, has been welcomed by all. As the current professional learning
system is migrating to the GTCS, an overarching strategy would be beneficial for
all. More could also be done by the authority to ensure that professional learning
activities are evaluated for impact in a consistent way. This would provide
appropriate information for a regular review of the programme of professional
learning. 
Theme 4:  How do local authorities deliver universal support and challenge
for all schools, and/or targeted support for specific schools to improve the
quality of education? 
• How does the local authority use the data from individual school or cluster improvement plans and
standards and quality reports, to provide targeted support?  
• What measures are used to identify the need for targeted support?  
• Is there targeted support for specific schools? What might that look like? (examples?)  What action is
taken if a review of a school concludes that a school is not performing satisfactorily and requires
targeted support?  
• What support systems (for example: mentoring, networks of practice, peer support groups) are
available for school leaders and staff?  
• What is the role of central staff in facilitating/contributing to collaborative approaches, which improve
school performance and outcomes for learners?     
Page 73

Page 74

APPENDIX 1  
Moray’s MQIF sets out clearly the local authority’s approach to supporting
schools, including universal and targeted support. QIOs engage with schools
termly. Each visit has a planned focus which includes such areas as school self
evaluation, attainment, and attendance data. The local authority’s universal school
support offer is framed around the four Moray education priorities. These are;
leadership of change, wellbeing, equity, and inclusion, curriculum and high quality
learning, teaching, and assessment. 
The local authority uses appropriately a range of data and information to monitor
school performance. For example, attainment, attendance and exclusions data
and outcomes of, or proximity to, national inspection activity. QIOs gather a range
of information relating to school improvement planning and evaluation. They
review school documentation and undertake planned termly visits to schools.
They collate this information centrally into a risk matrix of all schools. They update
this regularly and use this information to plan their engagement with, and monitor
the progress of, individual schools. As a result, the local authority has a broad and
increasingly reliable range of information about the performance of schools. The
risk matrix is a helpful tool. It has further potential to direct the work of officers
more efficiently to support identified schools effectively within a smaller central
team. 
All headteachers benefit from a wide network of support at local authority, locality,
cluster, and school levels. Local authority officers work together to promote a
culture of ongoing improvement in the quality of education. Across the local
authority, there is a growing culture of system collaboration, enabling school
leaders and staff to support and challenge each other. This approach has
developed and evolved over time. QIOs are linked to key groups and networks to
provide universal support and challenge to schools. 
Local authority officers and managers are aware of the importance of providing
pastoral support as part of their universal offer to schools. Officers provide  regular
briefing communication and engagement sessions to monitor the welfare of
colleagues and receive feedback on live issues headteachers are managing.
School staff speak very positively about the levels of pastoral support that they
receive. All policies and procedures, including a headteacher handbook, are
accessible and updated regularly to promote consistency across schools.    
Local authority officers identify the level of support required by schools using the
risk matrix. Schools receiving the universal offer of support and challenge have a
comprehensive improvement plan in place. They demonstrate improved
outcomes for children through ongoing evaluation of their impact through data
analysis and evaluative grades from inspection or self-evaluation activity.
Headteachers provide evaluations of performance to officers using triangulation
of evidence for the identified priorities for improvement. QIOs are active members
of network meetings and focus groups and are getting to know the schools
increasingly well. They use these forums to support and challenge throughout the
process. In secondary schools, the Head of Education and QIM participate in
attainment meetings. The secondary staff report that support and challenge has 
Page 74

Page 75

APPENDIX 1
increased following the move to a sector model. Overall, school staff feel that the
quality of support for schools has improved.    
Where a school requires targeted support, the Quality Improvement Team
implements a range of different actions. This is responsive to individual need and
can include, for example, temporary additional staffing, or coaching for school
leaders. Schools requiring targeted support are required to have an action plan
with baseline measures. This is monitored regularly by the Head of Education and
QIM. These actions have led to specific improvements in areas such as
attainment in literacy and numeracy and leadership capacity in some schools,
particularly in the primary sector. The Quality Improvement Team has identified
high levels of risk in some schools, particularly in the secondary sector. The Head
of Education and QIM have worked directly with secondary headteachers to
provide additional levels of challenge, particularly around attainment data. They
acknowledge that there is limited capacity in the central team to deliver support
and challenge to schools. There is also a need to continue to develop consistency
of approaches among all members of the central team to support and challenge
schools. 
5. Any other relevant information    
It was not possible to meet with representatives from professional associations. 
The council continues to have major problems with connectivity across all of the
educational establishments. This is an issue which elected members, senior
leaders, QIOs, headteachers, teachers and parents are aware of. There does not
appear to be a current initiative to resolve this. 
This is negatively impacting on; 
• teachers accessing learning materials, 
• children and young people researching online, 
• subject choice, 
• senior phase options for young people, 
• professional learning being delivered online, 
• teachers’ collegiate meetings being held online. 
Parent Council representatives who spoke to HM Inspectors note that there is
inconsistency about how headteachers share information with them about
feedback from local authority officers. They would welcome regular information
about local authority improvement priorities. They would also appreciate more
information about how central officers are contributing to improving outcomes for
children and young people across Moray. Elected members also indicate that they
would welcome further information on school performance at a local authority
level, particularly when inspection outcomes have not been positive. 
Page 75

Page 76

APPENDIX 2 
The recommendations from the National Report which will be considered by the service
were: 
• Ensure that all schools receive high-quality, consistent support through universal
provision.  This should reduce variability within and across local authorities and
secure equitable outcomes for learners. 
• For schools requiring targeted support, implement robust action planning,
monitoring and accountability. This is essential to ensure that necessary
improvements for learners are secured at pace. 
• Prioritise leadership development for middle leaders, particularly in secondary
schools, where improvement outcomes are less consistent, with a focus on the
principles 
Page 76

Page 77

Report to: Education, Children’s and
Leisure Services
Committee
Meeting Date: 13 May 2025      
Report by: Depute Chief Executive
(Education, Organisational
Development and
Communities)
Report No: EDU027/25/VC/AMB      
Author: Vivienne Cross  Contact Email: education@moray.gov.uk 
Subject: Mobile Phone Usage in Schools 
1. PURPOSE 
☒ For Decision      ☐  For Information 
1.1 The purpose of this report is to inform Committee of the Mobile Phone Usage in Schools
guidance produced for Moray schools based on Scottish Government Guidance as well as
to report the results of the consultation on the use of phones in schools and seek
Committee approval for this to be introduced from August 2025.  
1.2 This report is submitted to Committee in terms of Section III (D) (1) of the Council’s
Scheme of Administration relating to all the functions of the Council as an Education
Authority. 
2. SUMMARY  
2.1 Scottish Government produced advice and guidance to local authorities on Mobile
phones: Guidance for Scotland’s schools on 15 August 2024.    
2.2 The service created a short life working group to develop Guidance for Moray Schools
based on the national guidance and as a result surveyed all parents/carers, staff and
pupils regarding an option to be adopted in all schools from August 2025. 
3. RECOMMENDATIONS  
3.1 It is recommended that Committee:   
i) Approves the Moray Guidance on mobile phone usage in schools in Appendix
1; and
Item 9.*
Page 77

Page 78

ii) Notes the results of the consultation survey and agrees to implement the
option in paragraph 4.11 from August 2025. 
iii) Instruct Head Teachers to develop local policies, aligned to their positive
relationship policies for use from August 2025 
Author:  Vivienne Cross
Title:  Head of Education (Chief Education Officer) 
4. BACKGROUND AND CONTEXT  
4.1 The Scottish Government’s Behaviour in Scottish Schools Research (BISSR) provided the
detailed evidence on the many issues faced in schools across Scotland in the aftermath of
the pandemic, where relationships and behaviour have changed.  
4.2 It is acknowledged that mobile phones have become intrinsic to the way society
communicates and particularly for young people.  Notwithstanding, there is a growing
body of evidence to suggest that over-exposure to mobile phone use can result in limited
concentration, unhappiness and isolation. Further, the recently published Programme of
International Student Assessment (PISA) 2022 data, published in December 2023, showed
that almost a third of 15 year olds in Scotland and across all Organisation for Economic
Cooperation and Development (OECD) countries reported being distracted using digital
devices in most or every maths class – and around a quarter reported being distracted by
others using digital devices.  
4.3 Scottish Government have the desire to equip the next generation with the necessary skills
and resilience associated with the modern age.  With the release of national Guidance on
Mobile Phones in Scotland’s schools, there was a desire to empower Head Teachers to
take the steps they see fit to limit the use of mobile phones in our schools, up to and
including a full ban on the school estate during the school day.    
4.4 The service undertook initial conversations with Head Teachers and Parent Council chairs
and it was agreed to have a short life working group comprising of Head Teachers, teaching
and promoted staff, parent council representatives, trade union representatives, officers
and the Chair and Depute Chair of Committee to develop local guidance.    
4.5 Prior to the group meeting, officers drafted guidance based on the national guidance with
options for Head Teachers to consider which included that phones should be:
• Switched off and out of sight during lesson times/placed in storage facilities, unless
their use is required in support of learning and teaching or for medical reasons (e.g.
diabetes monitoring)
• Switched off and out of sight throughout the school day to include morning break
and lunchtime when on school grounds
• Switched off and out of sight/placed in storage facilities within each classroom,
handed in at the start of each lesson and collected at the end.  Pupils may use their
mobile phones during break and lunchtimes 
• In agreement with the school, parents/carers support a ‘no mobile phone to school’
policy where no mobile phones are permitted within school building
Page 78

Page 79

• Are permitted in classrooms, switched on but on silent mode and only accessed
when necessary to support learning and teaching, or for medical reasons (e.g.
diabetes monitoring) 
4.6 The working group had a very productive meeting where there was a desire to have a Moray
position due to the proximity of schools to each other, the number of placing requests
from one school to another and also that within secondary, and in particular the senior
phase, that some young people attend their main school as well as a neighbouring
secondary in order to study particular subjects.  Different options in place at different
schools would be confusing for both staff and pupils.  
4.7 It is important that any guidance for the use of mobile phones in schools aligns with
positive relationships and behaviour policies.  The guidance (Appendix 1) highlights
context, risks of using mobile devices,  purpose and aims, guiding principle and digital
citizenship as well as legal aspects and local and national policy and guidance.  It also
provides a possible layout for school based policies to support senior school leaders.  
4.8 The working group agreed an option which was consulted on for the last two weeks of term
providing the opportunity for all parents/carers, pupils from P5-S6 and all staff to respond
to.  The Council Communications team promoted this across social media platforms as
well as this being shared by Head Teachers using their normal communication methods.  
4.9 A large number of responses (3283) were received as follows:
Parents/carers  2012
Staff   489
Pupils   782 
4.10 There was opportunity to provide comments and many were received with the majority
supporting the option and others highlighting potential issues.  An executive summary of
the survey results is provided in Appendix 2.  
4.11 The consultation sought views on the following:
Primary
In Primary Schools, there should be no mobile phones or devices present in school unless
to support a medical need. 
Secondary
In Secondary Schools, mobile phones or devices should be switched off and out of sight,
inside the school building over the course of the school day.  The only exception to this
would be in the event of supporting a medical need. 
4.12 The results were:
Yes 73%
No  27% 
5. PROPOSALS  
5.1 It is proposed that Committee agrees with the results of the survey and that the options in
para 4.11 should be adopted in Moray Schools from August 2025.  
Page 79

Page 80

5.2 All schools should have their own policy, linked to their positive relationship and behaviour
policies with clear processes in place for those who do not adhere to the policy.    This
should also take into consideration and account for all exceptions as listed in the National
Guidance and now accounted for within the local guidance where the survey only
highlighted medical exception or other accepted exceptions.  To be considered as an
agreed exception, the child or young person should be in child’s planning with clear
reasons and protocols for the requirement for a phone as a reasonable adjustment.  There
should also be clear guidelines regarding contact with school by parents/carers as well as
a process for a pupil to contact their parent/carer during the school day. 
6. SUMMARY OF IMPLICATIONS  
6.1 The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) x 
Policy and Legal x 
Financial  x
Risk x 
Staffing  x
Best Value and Transformation  x
Property  x
Information Communications Technology/Digital             x
Equalities. Social Inclusion and Economic Impact             x 
Climate Change, Biodiversity and Sustainability  x 
6.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☒ Improving wellbeing of our population   
6.3 Policy and Legal 
The legal aspects are contained within the policy.  
Page 80

Page 81

6.4 Financial 
There are no financial implications arising directly from this report. 
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend this
Year
Virement
From
Other
Comments       
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments       
6.5 Risk 
There are risks in terms of any potential impact on learning and teaching where there are
insufficient devices for young people within schools.  In addition there are risks in terms of
connectivity where personal devices will not be able to be used putting further pressure on
the network.  
6.6 Staffing 
None  
6.7 Best Value and Transformation 
None  
6.8 Property 
None  
6.9 Information Communications/Technology/Digital 
None arising directly from this report  
6.10 Equalities, Social Inclusion and Economic Impact 
The national guidance aims to reduce harassment or discrimination through the removal
of mobile phones and includes five exceptions to mitigate against any negative impacts. 
The Scottish Government carried out a national assessment on the impact of the Mobile
Phone Guidance for Scotland’s Schools.  Their Equality Impact Assessment – Record can
be viewed online and is based on the five exceptions set out in S.19 of that guidance being
applied.   
Where the national guidance has been implemented already across Scotland, schools see
a positive impact on behaviour and relationships and in terms of social interaction
between pupils and pupils and staff.    
6.11 Climate Change and Biodiversity Impacts 
None
Page 81

Page 82

7. CONSULTATION  
7.1 This report has been prepared in consultation with the Quality Improvement Manager,
Early Years’ Service Manager, Quality Improvement Officers, Equal Opportunities Officer
and the Education Consultative Group and any comments made have been incorporated
into the report 
8. BACKGROUND PAPERS  
8.1 Guidance on Mobile Phones in Scotland's Schools   
Page 82

Page 83

APPENDIX 1
Moray Education
Use of Mobile Technology in Schools Guidance                                                                 
Context 
Mobile Technology is an integral part of the lives of children, young people and families across
Moray and Scotland with many bringing their own mobile devices into school.   
Used responsibly, mobile devices such as mobile phones can enhance learning and teaching,
communication and social experiences and can bring a sense of security to parents and carers
as their children enjoy more independent activities such as walking or travelling to and from
school unsupervised. 
Risks of using personal mobile devices 
There are risks associated with children and young people bringing their own personal mobile
phones in to school.  The Behaviour in Scottish Schools Research (BISSR) 2023 highlighted
cases of misuse both in terms of low level disruption in classes and more serious misuse such
as bullying and harassment of children and young people, and staff.  Such behaviour is
unacceptable in any context.  The inappropriate use of this technology can also detract from
their appropriate use in learning and can involve teaching staff, children and young people, and
parents/carers in investigations which require disproportionate amounts of time and can cause
significant disruption to the school and wider community. 
Stories relating to misuse of mobile phones are frequently reported in the media with many
demonstrating the potentially devastating impact of such misuse on individuals and their
families.   
The two key policy drivers, Curriculum for Excellence and Getting it Right for Every Child,
recognise that developing the wellbeing of staff and children and young people is essential for
creating the right environment for effective learning and teaching through curriculum delivery. 
In addition, Moray Council have made a clear commitment to recognising, respecting and
promoting Children’s Rights in Scotland through the United Nations Convention on the Rights of
the Child (UNCRC). 
Purpose 
…a better future for all Moray’s children
Values: Growth, Respectful, Experiences, Achieving, Teamwork 
The following guidance has been developed based on the “Mobile phones:  guidance for Scotland’s Schools”
Scottish Government guidance.  This guidance provides schools and local authorities with advice on the
development and updating of local policy in relation to use of mobile phones in schools. 
Page 83

Page 84

The purpose of this guidance is to provide schools in Moray with advice on how to develop a
local school policy that encourages safe and responsible use of personal mobile technology in
school, and beyond.  These policies should also be designed to protect staff and children and
young people from harassment and abuse which can arise from the misuse of such technology.   
Historically, ‘acceptable use’ policies have had a focus on managing and controlling online
behaviour.  More recently, there has been a move towards the promotion of positive
relationships and behaviour in both school and digital contexts.  This shift recognises the
important role of education and beyond in preparing young people to become ‘digital citizens’. 
It takes into account the fact that young people have extensive access to the internet through
mobile devices outside the school community and at home. 
Moray Guidance Aims 
• To provide a set of guiding principles for schools to consider when providing their own
policies on safe and responsible use, rooted in the principles of ‘citizenship’ as part of
Curriculum for Excellence, anti-bullying policies and the approaches to promoting positive
relationships and behaviour outlined in Included, Engaged and Involved Part 1 and Included,
Engaged and Involved Part 2.  This also includes The Moray Standards for Supporting All
Learners and Learning and Teaching
• To emphasise that these principles can be mapped to existing Health and Wellbeing
outcomes, particularly those referring to social, emotional and mental wellbeing as well as
relationships
• To emphasise schools’ responsibility for the health and wellbeing and safety of their staff,
children and young people
• To provide advice on how to develop local policies in partnership with the whole school
community, engendering a sense of engagement, ownership and commitment
• To provide advice on relevant legal aspects 
Moray Guiding Principles 
For children and young people, the internet is a place, not a thing.  It is a social space where
they regularly go and socialise.  Similar to any place where children and young people may go,
there are benefits and risks.  We would expect children and young people to behave
appropriately with guidance from adults, as with any other context.   
Parents/carers have a critical role in supporting their child(ren) and ensuring that school
policies are adhered to.  In addition, parents/carers can choose which device their child(ren)
have access to as well as whether they take them to school and what parental restrictions are
placed on such devices (for example, restriction on apps, parental monitoring/controls etc). 
Parents/carers may find it helpful to look at advice through the Safer School App (schools will
support with further information in relation to this App). 
Children and young people need to develop their understanding that certain behaviours may be
unacceptable and this includes in an online environment as well as school grounds, within the
school building or anywhere else.  Expectations for responsible behaviour and positive
relationships should remain consistent regardless of the context, where any breach of
expectations in relation to mobile technology should be handled in the same way as other
unacceptable behaviours in line with the school’s behaviour/positive relationships policy.  Staff
are expected to respond consistently to any irresponsible use of mobile technology and will
explain to children and young people why certain behaviours are unacceptable, and what the
potential impact of such behaviours might be. 
Page 84

Page 85

Our expectation in Moray is that policies on the use of mobile phone technology must be
incorporated into existing positive relationships/behaviour policies, which will already set out
how incidents will be dealt with. 
In order to promote good citizenship including digital, schools should consider how they will
deliver learning and teaching about online behaviour and relationships.  This could be
incorporated into the Health and Wellbeing curriculum e.g. Personal and Social Education,
School Assembly programmes, Digital Schools.   
Digital Citizenship 
The key principles of digital citizenship that may have an impact on use of mobile phones
include: 
• Safeguarding and Child Protection
o Any restriction on access to mobile phones at school supports protection of
children and young people from access to information and materials which may be
detrimental to their mental health and wellbeing
o Children and young people should be empowered and confident to access the
digital world creatively and fearlessly (UNCRC Article 17(e), protected from online
harm
• Digital etiquette (standards of conduct when using any mobile devices)
o Guidance on restrictions or limitations within school and school grounds for staff,
pupils and visitors should be clearly communicated
o Mobile phones must be prohibited during examinations including preliminary
examinations and class assessments
o If personal mobile devices are used to capture, film or photograph learning, clear
guidance must be provided to ensure the safety of pupils or staff (data subjects) 
o Personal devices should not be used for school events where school owned devices
will capture, film or photograph taking cognisance of GDPR and data permissions
(annual return)
o Images or recording obtained by use of mobile technology should not be uploaded
on social networking or other websites without permission of the subjects (schools
may use closed or private platforms in order to share events with parents/carers)
• Digital rights and responsibilities (what people can do if they feel uncomfortable with digital
communication and how they can report misuse)
o Guidance on consequences for the misuse of mobile phones including the removal
and return of phones if necessary
o Guidance on reporting the misuse of mobile phones within schools to include
support for staff and pupils who are subject to harassment using mobile phones
o Clear expectations for all regarding consistency in dealing with any misuse of mobile
phones
• Digital security (precautions that can be taken to ensure digital safety)
o Clarity on the curricular content to support pupil’s awareness of safe and secure use
of mobile technology, as a responsible citizen cognisant of positive relationships
and anti-bullying culture 
School Policy Development and Implementation 
Primary 
Page 85

Page 86

In Primary Schools, there should be no mobile phones or devices present in school unless to
support a medical need or other exceptions below. 
Secondary 
In Secondary Schools, mobile phones or devices should be switched off and out of sight,
inside the school building over the course of the school day.  The only exception to this
would be in the event of supporting a medical need or other exceptions below. 
If mobile phones are switched off, messages/calls should not be received through Smart
Watches.   
Key themes that may form a framework for whole school discussion and ultimate inclusion in
such a policy include: 
• Guidance regarding any restrictions on personal mobile phone device use within school
grounds,  within the school day, at social events and on school outings 
• Clear guidelines on the appropriate use of mobile devices for teaching purposes to include
capturing filming or photographing learning.  Due to the need to respect privacy, mobile
phones must not be used without prior consent of subjects (children and young people, or
staff) 
• Clear guidance on situations where mobile phones may be used by children and young
people with particular needs (e.g. young carer) 
• The range of ways the policy will be shared with children and young people, parents and
staff.  For example, School Handbook, School Website, or any other means of
communication 
• Clear procedures for confiscation and return of mobile phone devices 
• Clear protocols on reporting misuse within the school and support available to all where
they are subject to harassment 
• Clearly stated responsibility/liability for personal mobile phones in terms of loss, theft or
breakage (in Moray, responsibility lies with the individual for any loss, theft or breakage) 
• Agreed consequences and sanctions for the misuse of mobile technology are integrated
into each school’s existing policies and approaches to manging relationships and
behaviours 
• Consideration is given to whether exceptions for individual circumstances are required. For
example, exceptions for pupils: 
o  who are young carers and who require ongoing contact with family members; 
o  who have medical conditions that require monitoring using mobile technology; 
o  who experience concern or anxiety, including whilst away from home on school
trips;
o with additional support needs where access to their mobile phone is used as part of
a planned approach to managing their learning needs; 
Page 86

Page 87

o with disabilities who use their mobile phone as part of a reasonable adjustment,
including access to augmentative and alternative communication (AAC) etc. 
To be considered as an agreed exception, the child or young person should be in child’s
planning with clear reasons and protocols for the requirement for a phone as a
reasonable adjustment.   
Legal Aspects 
A full list of legislation relevant to all aspects of online safety, including the safe and responsible
use of mobile technology, can be found here https://www.gov.scot/policies/schools/wellbeing-
in-schools/ This has been lifted from the accompanying guidance for the Scottish version of the
e-safety self-review tool for schools, 360 Degree Safe, and will be kept under review and
updated as necessary. 
Regardless of specific legal aspects, staff, children and young people need to feel safe and
protected. The school’s policies on promoting positive relationships and behaviour and anti-
bullying will provide a framework which should underpin responses to cases where mobile
technologies have been, or are perceived to have been, misused. 
Policies should make clear that there are consequences for misusing mobile technologies. In
cases of extreme misuse where criminal events have been recorded using a mobile device, this
immediately becomes a police matter and the school should place the device in the hands of
the police without trying to access the contents. 
Taking photographs or film/audio recordings of anyone without their permission may be
regarded as a breach of a person’s rights, which may be regarded in some instances by the
police as a breach of the peace. 
Should anyone choose to record images and then upload them onto social networks without
permission from the person being recorded, the individual should be asked to remove this as
part of the normal behaviour policy of the school. Schools may also approach social networks
to request removal of inappropriate materials but the decision to do this lies with the social
network provider. 
Local Policies 
• Our Moray Standard for Learning and Teaching
• Our Moray Standard for Supporting All Learners
• Computer Use Policy/Social Network Sites – Moray Council 
National Policies/Guidance 
• National Guidance for Child Protection in Scotland 2021 (updated 2023):
https://www.gov.scot/publications/national-guidance-child-protection-scotland-2021-
updated-2023/ 
• United Nations Convention on the Rights of the Child (UNCRC):
https://www.unicef.org.uk/what-we-do/un-convention-child-rights/ 
• Health and Wellbeing in Curriculum for Excellence: 
https://education.gov.scot/media/5p4dvqvm/health-and-wellbeing-eo.pdf  
• Getting it Right for Every Child: 
Page 87

Page 88

www.scotland.gov.uk/Topics/People/Young-People/gettingitright   
• Better relationships, better learning, better behaviour: The Scottish Advisory Group on
Behaviour in Schools (SAGBIS) response to Behaviour in Scottish Schools Research
2013: https://education.gov.scot/media/42mjymdr/betterrelationships.pdf   
• Included, Engaged and Involved Part 2: A Positive Approach to Managing School
Exclusions: www.scotland.gov.uk/Publications/2011/03/17095258/0 
• Connect (Supporting Partnerships in Education) summary/advice for parents/parent
groups:
https://connect.scot/ 
https://connect.scot/news/summary-mobile-phone-guidance-schools 
• NSPCC age ratings/restrictions for apps and keeping children safe online:
https://www.nspcc.org.uk/keeping-children-safe/online-safety/ 
https://www.nspcc.org.uk/keeping-children-safe/online-safety/online-safety-blog/app-
age-rating/ 
Page 88

Page 89

APPENDIX 2
Executive Summary from Consultation Survey 
The document presents feedback from various stakeholder groups—
Parents/carers, Staff, and Pupils—regarding a proposed policy stance. The data
reveals that 1659 Parents/carers agree while 353 disagree, 334 Pupils agree and 448
disagree, and 402 Staff agree with 87 disagreeing. Key themes from the comments
include strong support for the policy due to issues like mobile phone distractions,
concerns about enforcement practicality, and the need for exceptions for medical
reasons. Respondents express some mixed opinions on whether a complete ban is
necessary, suggesting phones should be allowed during breaks and for safety,
walking to/from school. Overall, the feedback highlights the importance of clear
enforcement guidelines, alternative technology provision, and safety
considerations for pupils.   
Insight into the Data: 
1. Stakeholder Groups: The data includes various stakeholder groups such as
Parents/carers, Staff, and Pupils.
2. Agreement with Policy: The responses indicate whether the stakeholders agree
with the proposed policy stance. 
The data shows the count of IDs by stakeholder group and their agreement with the
proposed policy stance. Parents/carers have 1659 agreeing and 353 disagreeing, pupils
have 334 agreeing and 448 disagreeing, and staff have 402 agreeing and 87 disagreeing. 
0 200 400 600 800 1000 1200 1400 1600 1800
Parents/carers
Pupils
Staff
ID
Please identify which stakeholder group you
belong to:
'Please identify which stakeholder group you belong to:'
and 'Do you agree with the proposed policy stance above?'
No Yes
Page 89

Page 90

Evaluative Summary of the Last Column: 
The last column contains further summary comments from respondents. These
comments provide additional context and opinions regarding the proposed policy
stance. Here are some key themes observed in the comments:
• Support for Policy: Most respondents express strong support for the policy,
highlighting issues such as distraction caused by mobile phones and the need
for a strict enforcement policy.
• Concerns and Suggestions: Some respondents raise concerns about the
practicality of enforcing the policy, the need for exceptions for medical reasons,
and the importance of having alternative technology available for educational
purposes.
• Mixed Opinions: There are mixed opinions on whether phones should be
completely banned or allowed under certain conditions, such as being switched
off during lessons but available during breaks for safety reasons. 
Summary Comments:
• Enforcement: Clear enforcement guidelines and sanctions are necessary to
support staff in implementing the policy effectively.
• Technology Alternatives: Schools should provide alternative technology, such
as tablets, to ensure students can still access necessary resources without
relying on mobile phones.
• Safety Considerations: Some respondents emphasise the importance of
allowing phones for safety reasons, especially for pupils who walk to and from
school alone. 
Overall, the comments reflect a diverse range of opinions and highlight the need for a
balanced approach to the policy that considers both educational and safety aspects. 
Page 90

Page 91

School Policies – Possible layout 
Name of Policy
For example…
‘Disconnect to Reconnect’
‘Switch off and Engage’
‘Ready for learning, ready for life’
‘Responsible Digital Citizens’
Opportunity for pupil/staff/parent voice
Introduction • Short paragraph to give purpose of policy and why it is needed
Rationale
• Linked to school vision and values
• Purpose of strategy
• Evidence to inform (from local authority guidance or local/national
research)
Section 1
Procedures
and
Expectations
• Aligned to Positive Relationships Policy
• What happens at start of school day
• What happens during lessons in the event of mobile phone
presence/use
• What happens in event of any misuse
• Potential to include video of what this would look like for a
learner/learners in your school
• Schools may wish to have posters/signs indicating ‘Mobile-free Zone’
around school building
Section 2
Frequently
Asked
Questions
• Why is this policy being introduced?
• Does this happen elsewhere?
• Will pupils have access to technology to support learning and if so,
what will this be?
• What should I do if I need to contact my child when they are at school?
• As a pupil, how do you contact your parent/carer if required when at
school?
• What happens in an emergency situation (e.g. Fire Alarm)?
• What if my child needs their phone for medical purposes?
• What if my child requires to access certain apps to support learning?
Section 3
Positive
Citizenship
• Link to Positive Behaviour Policy and other relevant school
policies/expectations e.g. Learning and Teaching
• How this information will be shared with stakeholders – e.g. website,
communications etc 
Page 91

Page 92

Page 92

Page 93

Report to: Education, Children’s and
Leisure Services
Committee
Meeting Date:  13 May 2025      
Report by: Depute Chief Executive
(Education, Communities
and Organisational 
Development) 
Report No: EDU005/25/AH      
Author:  Andrew Hall Contact Email: learningestate@moray.gov.uk 
Subject: Closure of Crossroads Primary School – Statutory Consultation 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to provide an update on the statutory consultation on the
closure of Crossroads Primary School and seek agreement on next steps.  
1.2  This report is submitted to the Council in terms of Section III (D) (7) of the Council's
Scheme of Administration to consider the closure of schools and other educational
establishments under the control of the Council as Education Authority. 
2.  SUMMARY  
2.1  Crossroads Primary School was mothballed in January 2023 due to declining pupil
numbers and given no change in the school roll, this prompted a decision in August 2024
to undertake a consultation on its future, in accordance with the Schools (Consultation)
(Scotland) Act 2010. This report presents the outcome of that statutory consultation on a
proposal to close Crossroads Primary School and reassign its catchment to other schools.   
2.2  The Committee is requested to consider the Consultation Report at Appendix 1 which
outlines the educational benefits of closing Crossroads Primary School, citing that larger
school rolls provide better social interaction opportunities and a broader range of
curricular activities while emphasising the importance of maintaining a suitable learning
environment that supports the needs of all learners, ensures they receive quality
education and access to facilities that enhance their learning experience. 
2.3  Public engagement was a crucial aspect of the consultation, with various stakeholders
invited to participate. The feedback collected from public meetings and the online survey
Item 10.*
Page 93

Page 94

indicated a general preference for closing the school with the most favoured option being
to split the catchment area between Keith and Rothiemay Primary Schools. 
2.4  Education Scotland conducted an independent review of the consultation proposal,
attending the community meeting and visiting schools to elicit the views of children
directly or indirectly impacted by the proposal.  Their independent report supported the
Council proposal to close the school noting that it had made a reasonable case to
permanently close the school and highlighting that children are settled in schools they
now attend and most families had elected to send their children to other schools prior to
the mothballing and temporary closure of Crossroads Primary School. 
3.  RECOMMENDATIONS  
3.1  It is recommended that Committee:   
i)  considers the formal consultation report attached as Appendix 1 regarding
the closure of Crossroads Primary School; and 
ii)  recommends to Moray Council that Crossroads Primary School is closed and
that the catchment area is reassigned to Keith and Rothiemay Primary
schools. 
Andrew Hall
Programme Manager (Learning Estate) 
4.  BACKGROUND AND CONTEXT  
4.1  At its meeting of 28 September 2022 the Council  agreed to mothball Crossroads Primary
School (PS) (para 27 of the minute refers).  The school has been mothballed since 9
January 2023 and the catchment temporary rezoned to Rothiemay Primary School 
4.2  Following public engagement on the long-term future of Crossroads PS, this  Committee,
at its meeting of 17 August 2024 (para 13 of the minute refers), approved the launch of a
statutory consultation into the permanent closure of the school. 
4.3  The Schools (Consultation) (Scotland) Act 2010 requires that local authorities undertake a
formal consultation process whenever changes are proposed to the location or catchment
area of a school; or when a school is being considered for closure.  
4.4  The statutory consultation proposal on the permanent closure of Crossroads PS
discussed several options that had been considered for changes to the school catchment
area, with two options considered to be most viable. These were to rezone the current
Crossroads PS catchment area to Keith PS or to rezone the catchment area between Keith
and Rothiemay primary schools  
4.5  The statutory consultation took place between 23 September 2024 to 15 November 2024,
which covered the required minimum period of 30 days school term time consultation.  
4.6  In support of the statutory consultation process, two in person public meetings were held.
The first meeting, open to all the community, took place at the King Memorial Hall, Grange,
Page 94

Page 95

Keith at 6:30pm on 22 October 2024. A record of this meeting is contained in Appendix 1
as Appendix B.  
4.7  The second meeting, for current and future parents and carers, took place at Keith
Grammar School, School Road, Keith at 7pm on 24 October 2024. There were no
attendees at this second meeting.  
4.8  A further online meeting was planned for 23 October 2024 at 7pm but there was no
stakeholder interest in attending.  
4.9  Pupils at Keith, Rothiemay, Newmill and St Thomas’s RC primary schools were consulted
on the closure proposal and their responses have been collated at Appendix 1 as
Appendix C.  
4.10  An online survey was made available to all consultees during the consultation period and
50 responses to the survey were received. The online survey findings are at Appendix 1 as
Appendix D. All written representations received during the consultation were on a copy
of the online survey form and have been incorporated into the same survey findings.  
4.11  At the end of the consultation period all written submissions, along with the minutes of the
public meeting, were shared with Education Scotland for consideration. Their written
report on the consultation is contained within Appendix 1 as Appendix F. 
5.  PROPOSAL  
5.1  Officers within Education Resources and Communities Service and Education Service
have carefully considered all of the responses to the consultation and have made a
recommendation in Appendix 1 (paragraph 14.1) to this report. The recommendation
supports the majority community view and gives maximum parental choice. The
recommendation is that the Council should adopt the proposal to permanently close
Crossroads PS and its catchment area be rezoned between Keith and Rothiemay primary
schools. 
5.2  With this recommendation all existing primary aged pupils that were temporarily rezoned
to Rothiemay PS are expected to continue their education there and will continue to be
provided with free school transport. 
5.3  Free school transport would be extended to current Crossroads catchment pupils that
currently attend Keith PS. The date for this will be dependent on a final decision by
Scottish Government on the proposal to close Crossroads Primary School and time to
establish additional transport requirements.   
5.4  As this report is in relation to the permanent closure of a school, the recommendation of
this Committee should be considered by Moray Council at its next meeting on 21 May
2025. 
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
Page 95

Page 96

SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) ✓ 
Policy and Legal ✓ 
Financial ✓ 
Risk  ✓
Staffing  ✓
Best Value and Transformation  ✓
Property ✓ 
Information Communications Technology/Digital  ✓
Equalities. Social Inclusion and Economic Impact  ✓ 
Climate Change and Biodiversity Impact ✓ 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population   
6.3  Policy and Legal 
The Schools (Consultation) (Scotland) Act 2010 has been referred to and adhered to
throughout the statutory consultation process and this adherence will continue with
respect to decisions on the future of Crossroads Primary School.   
The Schools (Scotland)(Consultation) Act 2010 requires that prior to any final decision on
school closure the report needs to have been in the public domain for a minimum of 3
weeks. A copy of the full Consultation Report has been made available to Education
Scotland. 
Formal title deeds have been researched for the land and buildings that encompass the
Crossroads PS estate. The title contains reversionary rights in favour of the Earl of Fife or
his successors (the original owner).  The deeds state that if the land, including the school
buildings, are no longer used for educational purposes, the successors of the Trustees of
the Earl of Fife can require the land to be returned to them in exchange for payment of the
current value of the school buildings (valued at £100,000 in 2024).  Any proposal for a
future open market sale may not be possible without the Council first checking if the
current Earl of Fife wishes to exercise their reversionary rights. 
Page 96

Page 97

6.4  Financial 
A decision to close the school would realise an annual revenue saving of £55,143, this is
in addition to the savings during the mothballing period of £126,247. 
A re-opening of the school would require significant capital works to the building over
future years to achieve the Moray Learning Estate Strategy aim and Scottish Government
mandate for all schools to be an overall Condition B status or better. The cost of upgrade
has been estimated to be over £101k to support reopening with a further investment of
over £237k over the next 10 years. This capital sum is not within the current capital plan. 
In the event of the closure of Crossroads PS and rezoning of the catchment there would be
a continued cost for transporting children to Rothiemay PS of £12,337.60 for the financial
year 2025/26. This contract would be retendered in April 2026.   
The financial impact of school transport provision for those children who would now be
entitled to Council-provided transport to Keith PS is still to be fully determined. The
current vehicle provided to transport catchment children to Keith Grammar School has
capacity to also carry the additional Keith PS pupils and this is not expected to incur
significant if any additional cost. However, an extra vehicle run would be required for the
afternoon return from Keith PS at an additional cost from the current operator of £145 a
day. This would apply until the end of the current financial year and will be re-tendered
from April 2026.   
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend this
Year
Virement
From
Other
Comments
x x x x X X 
Annually Recurring Costs:
Service Area Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments
Transportation £30,054 April
2025
30,054 n/a to be re-
tendered in
April 2026 
6.5  Risk 
There are no risks associated with adopting the recommendations report.  
6.6  Staffing 
There are no staffing implications should Crossroads PS close.  
6.7  Best Value and Transformation 
There are no best value or transformation implications arising directly from this report.  
6.8  Property 
Property ownership status has been outlined earlier in the report. 
Page 97

Page 98

Whilst the school has been mothballed, the state of the building has been maintained as
wind and watertight. The building has been drained down and regular janitor inspections
conducted and any issues, e.g. water ingress, have been addressed. This care and
maintenance regime will continue until a final decision on the future of the school is
made.   
6.9  Information Communications/Technology/Digital 
There are no information communications/technology/digital impacts arising directly from
this report.  
6.10  Equalities, Social Inclusion and Economic Impact 
An Integrated Impact Assessment (IIA) is a statutory requirement on the Council to assess
the policies and practices necessary to meet the requirements of anti-discrimination and
equalities legislation. It also affords an opportunity for the Council to consider the impact
on the education service. An assessment has been carried out and is at Appendix 2. 
The main impact for children in the P1-7 age group is the length of journey from
Crossroads to either Keith or Rothiemay primary schools; however, as Crossroads Primary
School has been mothballed since January 2023, the Crossroads catchment pupils who
are temporarily rezoned to Rothiemay Primary School are already making the journey to
the school on Council-provided transport. Those Crossroads catchment children who
have ‘out-of catchment’ placing requests at Keith Primary School also already travel to
school using private transport and the positive change for those in the proposed new Keith
catchment would now be entitled to Council-provided transport. 
Under the Equality Act 2010 education providers must not treat disabled pupils less
favourably and should take reasonable steps to avoid putting disabled pupils at a
substantial disadvantage. Any existing arrangements in place for pupils with additional
support needs within the schools affected will continue. As discussed in Appendix 1
Section 4.26, Keith Primary School is the enhanced provision base for the Keith
Associated School Group, and as such is fully adapted to meet the requirements of pupils
with a range of additional support needs.  
6.11  Climate Change and Biodiversity Impacts 
A carbon assessment of Crossroads Primary and Rothiemay Primary, where the majority of
pupils moved to at the time of mothballing, was undertaken by the Moray Council Climate
Team in 2022. 
Overall the carbon impact per pupil is substantially lower at Keith (0.15 tCO2e/pupil) and
Rothiemay (0.16 tCO2e/pupil) primary schools than at Crossroads Primary School (2.72
tCO2e/pupil).  The reopening of Crossroads Primary School would therefore significantly
increase carbon emissions per pupil in the future, outweighing any additional transport
emissions associated with longer pupil journeys.  Furthermore more children will be
expected to use the bus rather than private cars to travel to Keith Primary School
contributing to a further reduction in carbon emissions. 
A closure of Crossroads Primary School would therefore be predicted to lead to carbon
savings. 
7.  CONSULTATION
Page 98

Page 99

7.1  This report has been prepared in consultation with Senior Officers in Education, Senior
Accountant, Legal Services Manager, HR Manager,  Legal Services Manager, Education
Business Support Manager, Public Transport Officer (Education), Equalities Officer and
Caroline O’Connor, Committee Services Officer and any comments made have been
incorporated into the report. 
8.  BACKGROUND PAPERS  
A. 20240917 Learning Estate - Closure of Crossroads Primary School Statutory
Consultation Proposal
B. 20240917 Crossroads Options Appraisal
C. 20240917 Crossroads Financial Report 
Page 99

Page 100

APPENDIX 1       
CONSULTATION REPORT REGARDING 
THE CLOSURE OF CROSSROADS 
PRIMARY SCHOOL      
22 April 2025 
This Consultation Report has been issued by the Moray Council in
accordance with the Schools (Consultation) (Scotland) Act 2010 (as
amended)        
If you have difficulty reading this document please contact 
Learning Estates Team on 01343 563374 
Page 100

Page 101

Contents 
1. Introduction 
2. The Consultation Process 
3. The Proposal 
4. Educational Benefits Statement 
5. Public Engagement    
6. Written Responses    
7. Moray Council Response to Written and Oral Representations 
8. Education Scotland Report 
9. Alleged Omissions or Inaccuracies and Additional Information 
10. Compliance with Section 9(1) of the Schools (Consultation) (Scotland) Act
2010 
11. Compliance with Sections 11A to 13 of the Schools (Consultation) (Scotland)
Act 2010 
12. Representations to Scottish Ministers in terms of Section 15 of the Schools
(Consultation) (Scotland) Act 2010 
13. Conclusion 
14. Recommendation  
Appendices: 
Appendix A   Closure of Crossroads Primary School Consultation Document 
Appendix A1
Appendix A2
Appendix A3
Options Appraisal
Public Engagement Comments/Suggestions
Financial Template 
Page 101

Page 102

Appendix B  In person Public Meeting Record – (Memorial Hall, Grange, Keith, 22
October 2024) 
Appendix C  Pupil Engagement
Appendix D  Survey Responses
Appendix E Survey Summary Report
Appendix F Education Scotland Consultation Report   
1. Introduction 
1.1 This report has been prepared following a consultation on the proposal to
discontinue education at Crossroads Primary School, which is currently
mothballed and to reassign the current catchment area to Keith Primary School or
to reassign the catchment area between Keith and Rothiemay primary schools. 
1.2 This report has been prepared in accordance with the Schools (Consultation)
(Scotland) Act 2010 on the above proposal. The objective of this report is to:    
• Provide a record of the total number and a summary of written and oral
responses received during the statutory consultation period; 
• Provide a statement of the Council’s response to those written and oral
representations;
• Provide the full text of Education Scotland’s report and a statement of the
Council’s response to this report; 
• Provide a statement on how the Council reviewed the above proposal
following the representations received during the statutory consultation
period; 
• Provide details of any omission from, or inaccuracy in, the proposal document
and state how the Council acted on it;
• State how the Council has obeyed Section 12 of the Schools (Consultation)
(Scotland) Act 2010 when reviewing the above proposals; and
• Provide officer conclusions and recommendation. 
2. The Consultation Process 
2.1 The requirement for consulting on a relevant proposal relating to schools is set out
in the Schools (Consultation) (Scotland) Act 2010. 
2.2 At its meeting on 17 September 2024 the Education, Children’s and Leisure
Services Committee authorised a statutory consultation on a proposal to closure
of Crossroads Primary School and rezone its catchment. 
Page 102

Page 103

2.3 The proposal document made clear to consultees that the consultation period
would run from 23 September 2024 until 15 November 2024.  This more than
adequately covered the required minimum of 30 days term time required for
consultation. 
2.4 On 23 September 2024 copies of the proposal document were made available to
Parents/Carers, schools staff and the general public via the following link
http://www.moray.gov.uk/moray_standard/page_156884.html.   
2.5 Full copies of the proposal document were made available at Keith Primary School,
Rothiemay Primary School, Newmill Primary School, St Thomas's RC Primary
School, Keith Nursery, King Memorial Hall. Keith Library and Elgin Central Library. 
2.6 A copy of the document was also available on request from Moray Council
Learning Estates Team. 
2.7 The proposal document was also published on the Council website:
http://www.moray.gov.uk/moray_standard/page_156884.html 
2.8 Communication regarding the consultation was published on the Council’s
newsroom on 17 September 2024 when a news release was issued. It was further
promoted on social media platforms on 17 September 2024 to notify the public
about the Committee’s decision and on 23 September 2024 to launch the
consultation.  
2.9 The consultation was also advertised in the Press & Journal on 23 September
2024, the Banffshire Herald on 24 September 2024, and the Northern Scot on 27
September 2024. 
2.10 An online survey was available throughout the consultation period. 
2.11 The consultees were also given the option to submit their comments to on the
proposal via email to learningestate@moray.gov.uk or posted to Community
Support Officer (Learning Estate), Elgin Council Offices. High Street Elgin IV30 1BX 
2.12 Two face-to-face public meetings were planned during the consultation period. The
first meeting, open to all the community, took place at the King Memorial Hall,
Grange, Keith, AB55 6SL at 6:30pm on 22 October 2024. The second public
meeting, for current and future parents and carers, went ahead at Keith Grammar
School, School Road, Keith, AB55 5GS at 7pm on 24 October 2024 but there were
no attendees. 
2.13 A further online meeting was planned for on 23 October 2024 at 7pm. Anyone
wishing to attend this meeting were able to express their interest in attending by
Page 103

Page 104

emailing learningestate@moray.gov.uk. There was no stakeholder interest up to the
proposed start time of meeting so it did not go ahead. 
2.14 Education Scotland received a copy of the proposal document and attended the
public meeting.  
2.15 At the end of the consultation period, Education Scotland were provided with all
documentation relating to the consultation.  They visited Keith Primary School,
Rothiemay Primary School, Newmill Primary School, St Thomas’s Primary School
and Keith Grammar School and a meeting with the Strathisla Community Council.  
Following their visit and a review of relevant documentation, Education Scotland
issued a report on the educational aspects of the proposal.  The report is covered
in more detail within Section 8 of this report. 
2.16 Adhering to the statutory requirement this consultation report was published on
the Moray Council’s website on 22 April 2025, in preparation for the Education,
Children and Leisure Services Committee on 13 May 2025, and more than the
three weeks minimum time required, prior to the Council meeting on 21 May 2025
where it is expected a decision on whether to implement the proposal will be
made. 
3. The Proposal 
3.1 The Proposal document, included as Appendix A to this report,
was issued to those individuals and bodies listed under
‘Distribution’ within the Proposal document.  The Proposal
document was also published on the Council website at:
http://www.moray.gov.uk/moray_standard/page_156884.html 
3.2  The proposal on which the consultation took place was: 
To close Crossroads Primary School, currently mothballed, and re-assign its
catchment area to Keith Primary School (Option 1) or reassign its catchment
area between Keith Primary School and Rothiemay Primary School (Option2)   
3.3 The schools that could be impacted by this proposal are; 
• Crossroads Primary School 
• Keith Primary School
Page 104

Page 105

• Rothiemay Primary School    
3.4 The proposal was advanced for the following reasons: 
• No children have attended Crossroads Primary School since January 2023
while the school was mothballed. The decision to mothball was taken as
the pupil numbers had fallen to 4 at the start of the 2022/23 academic
session and implemented on 9 January 2023; 
• There were 4 children within the Crossroads catchment that could have
enrolled for P1 in August 2023 but only 1 request was made; 
• A further 4 pupils were in the catchment area for Crossroads and due to start
Primary 1 in August 2024 but all chose to make placing requests to either
Keith Primary School or St Thomas RC Primary School;   
• Although the number of primary school children in the Crossroads Primary
School catchment totals 25 for the 2024/25 session families have chosen
to send their children to the following settings: 
▪ Keith Primary – 17 registered
▪ St Thomas RC Primary – 3 registered
▪ Rothiemay Primary – 5 registered 
• A school roll of fewer than 15 pupils hampers social interaction
opportunities for children, who conversely benefit from attending larger
schools amongst more children of their own age. 
• The Council has explored alternatives in arriving at this proposal, explained
further below. 
• The current condition of Crossroads Primary School is category C (Poor)
overall, with significant areas at Category D (Bad). 
3.5 An update report on the Crossroads School was given to the Education, Children
and Leisure Services Committee on 7 June 2023. The Committee agreed to the
preparation of an options appraisal regarding the future of Crossroads Primary
School. 
Page 105

Page 106

3.6 A follow up report was submitted to the Education, Children and Leisure Services
Committee on 17 September 2024 seeking approval to undertake a statutory
consultation on the closure of Crossroad Primary School in accordance with the
Schools (Consultation) (Scotland) Act 2010. 
3.7 The Education, Children’s and Leisure Services Committee agreed to: 
(i) Authorise a statutory consultation with local stakeholders (Parent
Councils, parents, pupils, staff and the local community) on the proposal
to close Crossroads Primary School; and, 
(ii) To receive a further report on the outcome of the consultation in February
2025. 
Due to insufficient time and resource the Moray Learning Estate team were
unable to complete the consultation analysis and draft the Consultation Report to
support Committee meeting in February 2025 and will instead be sending the
Consultation Report to Education, Children’s and Leisure Services on 13 May
2025.   
4.  Educational Benefits Statement 
4.1 In 2009, the Scottish Government set out its Vision for the Future School Estate in
Scotland, in ‘Building Better Schools:  Investing in Scotland’s Future’. 
4.2 In September 2019, this was updated with Scotland’s Learning Estate Strategy
‘Connecting People, Places and Learning’ which was developed by Scottish
Government and COSLA.  This contains ten guiding principles.  Local Authorities
are required to take account of these principles in planning changes to their school
estate, namely: 
• Learning environments should support and facilitate excellent joined up
learning and teaching to meet the needs of all learners;
• Learning environments should support the wellbeing of all learners, meet
varying needs to support inclusion and support transition for all learners;
• The learning estate should be well-managed and maintained, making the best
of existing resources, maximising occupancy and representing and delivering
best value; 
• The condition and suitability of learning environments should support and
enhance their function; 
• Learning environments should serve the wider community and where
appropriate be integrated with the delivery of other public services in line with
the place principle; 
• Learning environments should be greener, more sustainable, allow safe and
accessible routes for walking, cycling and wheeling and be digitally enabled; 
Page 106

Page 107

• Outdoor learning and the use of outdoor learning environments should be
maximised; 
• Good consultation about learning environments, direct engagement with
learners and communities about their needs and experiences, and an
involvement in decision making processes should lead to better outcomes for
all; 
• Collaboration across the learning estate, and collaboration with partners in
localities, should support maximising its full potential; 
• Investment in Scotland’s learning estate should contribute towards improving
learning outcomes and support sustainable and inclusive economic growth. 
4.3 In May 2016, Moray Council approved the ‘Schools for the Future’:  A policy for
Sustainable Schools’ in order to monitor schools provision in Moray and ensure
provision continues to meet the needs of learners, parents and the community and
enable the Council to meet its requirements to ensure best value, as per the Local
Government Scotland Act 2003.  This policy contributes to the aim of ensuring all
children and young people in Moray have equality of opportunity in terms of access
to educational provision and facilities.   
4.4 Within this policy, Moray Council set criteria and indicators in determining
optimum quality education experience which include provision of accommodation
as reported to Children and Young People’s Services Committee for: 
• The range of curricular and wider school activities available for children to
enable them to achieve in a range of activities for personal and wider
achievement (e.g. physical education, music, art, drama); 
• The ability of the school to cater for children with Additional Support Needs; 
• The school’s ability to provide access to a suitably broad and balanced
curriculum; 
• The quality of the physical environment for learning and teaching   
▪ Condition - minimum standard B  
▪ Suitability - minimum standard B   
• No more than two composite year groups in a single classroom at primary
school level.   
• A minimum of four teachers at a primary school. This recognises both the
needs of pupils and the demands on teachers; and. 
• Ideally, at least seven classrooms (one for each year group). 
4.5 Key statutory requirements are further subsumed including delivery of 2 hours
minimum Physical Education as part of National standards, compliance with
statutory legislation in relation to school accommodation and Additional Support
Page 107

Page 108

Needs, UNCRC and overall extent of on-site accommodation and facilities
(including required general purpose spaces, play and social spaces, staff rest areas
and outdoor spaces). 
4.6 Moray’s vision and strategic direction for all involved in Moray Education as set out
in our Education Strategic Plan and Priorities – improving outcomes for all Moray’s
children and young people – is underpinned by the core entitlements of Curriculum
for Excellence in order to ensure all children and young people maximise
development in the four capacities:  Successful Learners, Confident Individuals,
Effective Contributors and Responsible Citizens.  This stems from Early Learning
and Childcare, across the Broad General Education and through into the Senior
Phase, working across our system to ensure our learners progress to positive and
sustained post-school destinations.  Underpinned by our Council values of Fair,
Ambitious, Improving and Responsive we are ambitious to achieve excellence
together in benefit of all Moray’s children and young people. 
4.7 In order to deliver on our Education strategic vision and priorities, all Moray schools
thus work towards: 
• Curriculum:  With ongoing national reform, reviews and wider national
consultation ongoing, we recognise the importance of further developing our
curriculum across the BGE and into Senior Phase, in order to improve
curriculum breadth and opportunities for all children and young people in
Moray. 
• Learning, teaching and assessment:  High quality learning, teaching and
assessment are fundamental for ensuring learners’ experiences are matched
to their talents, interests and needs in preparation for life and work. This
includes planning high quality learning experiences across the four contexts
for learning, extending skills, acquiring knowledge and developing in the four
capacities of Curriculum for Excellence. 
• Reviewing Additional Support Needs:  Supporting our learners to progress
throughout their learning journeys is essential in order for them to achieve,
enabling progression to positive and appropriate post-school destinations and
pathways. Ensuring universal and targeted supports and interventions are in
place based on clear identification of need ensures we continue to nurture
and support our children and young people.   
• Strengthening leadership & empowerment:  Through leadership and
empowerment across our system, we will accelerate progress with our
strategic priorities 1-3, supported by professional learning, development
experiences and opportunities. Building capacity across our system, we will
strengthen leadership at all levels and realise a sustainable service model as
we look to the Educations service of the future.
Page 108

Page 109

As we look to the next three years, 2025-2028, renewed focus across Education will be on the
following areas from session 2025/2026: 
• Strengthening our leadership of change
• Ensuring wellbeing, equity and inclusion for all learners
• Building a learner-centred and responsive curriculum
• Developing consistency in high quality learning, teaching and assessment 
4.8 As further educational context, Curriculum for Excellence guides us to achieve
transformation in education in Scotland by providing a coherent, more flexible and
enriched curriculum from 3 to 18 firmly focused on the needs of the child and young
person and designed to enable them to become successful learners, confident
individuals, responsible citizens and effective contributors. All children and young
people are entitled to experience:   
• a coherent curriculum from 3 to 18;   
• a broad general education, including well planned experiences and outcomes
across all the curriculum areas. This should include understanding of the
world and Scotland’s place in it and understanding of the environment;   
• a senior phase which provides opportunities for study for qualifications and
other planned opportunities for developing the four capacities;   
• opportunities for developing skills for learning, skills for life and skills for
work;   
• opportunities to achieve to the highest levels they can through appropriate
personal support and challenge; and, 
• opportunities to move into positive and sustained destinations beyond
school; 
4.9 Educational benefits are considered below for pupils in respect of options
previously outlined in this proposal document. 
4.10 In December 2020, Moray Council approved the approach to the Moray Learning
Estate Strategy, setting out the vision of providing a sustainable education service
aiming for excellence.  As well as improving condition and suitability as noted in
10.4 above, among wider outcomes this strategy aims to ensure our learning estate
enriches the learner journey and supports curricular delivery noting the quality of
learning environment as having a direct impact on learning and achievement of
children and young people.   
4.11 Ensuring all young people develop in the four Curriculum for Excellence capacities
through the learner entitlements in 10.8 above would prove more challenging if
Page 109

Page 110

Crossroads Primary School were to reopen with a reduced number of pupils across
the Primary age range.  This will also place additional pressures on staff, for
example in planning for a wide range of needs, year groups and abilities, in
developing the curriculum, delivery of learning, teaching and assessment, and
managing educational change.  As a result, multi-stage composite class
arrangements can prove challenging to recruit teachers compared with larger
schools where classes have single or few stage composite arrangements. 
Opportunities for teaching staff to engage in regular and frequent moderation
activities, allowing them to plan appropriate learning opportunities and make valid
assessment decisions are enhanced in schools with more than 4 teaching staff, or
even better, where stage partners are available. 
4.12 Pupils attending other primary schools within the Keith Associated Schools Group
regularly work in pairs and groups on shared learning tasks and cooperative
learning activities.  A school size low in pupil numbers, for example in a school of
10 or fewer children, based on potential future intake if Crossroads Primary School
re-opened, would mean that groups would be curtailed in size restricting group and
paired activities, with little to no flexibility in change or rotation of participants in
pairings or groupings.  Pupils could be spread multi-stage across P1 to P7, and
while benefitting cross-stage working, this may result in reduced peer challenge in
learning or potential for sibling pairing/groups.  The variety of skills, knowledge and
wider experiences brought to the groups would be further restricted by roll size and
may result in gender imbalances and inequity in provision of a full programme of
wider school activities. 
4.13 In larger schools, staff regularly engage in joint projects (between stages and
between teachers of the same stage) and staff professional and collegiate
development activities.  Children have regular opportunities to self and peer assess
in these schools as well as work in stage and cross stage pairings and groups. 
4.14 ICT has the potential to overcome some of the challenges for staff and young
people in collaborative working as an integral part of the learning process, however
there are ongoing issues with connectivity in rural areas, and access to sufficient
ICT across Moray 
4.15 In Rothiemay and Keith Primary Schools, children have regular opportunities to
work in cooperative learning groups, on paired and in group activities with two and
thirteen classes formed in each school respectively.  This further supports
discussions and debate with a range of viewpoints and background of learners
contributing to such activities.  Class organisation within each school offers a
blend of individual, group and class learning and teaching over the session. 
Children at Rothiemay Primary have access to single-stage wellbeing check-ins
during the morning to allow them to share worries and concerns with their peers
and relevant staff.  Those at Keith Primary have an active-start each morning, this
allows for peer and group consolidation of learning, collaborative activities,
teacher check-in on wellbeing and the application of learning, ICT and others skills. 
Page 110

Page 111

4.16 The reopening of Crossroads Primary School would prove more restrictive for
children to develop skills for learning, life and work with fewer or no opportunities
to work with others of a similar age and stage, which is not possible in a school with
a very low number of pupils, for example in a school of 10 or fewer children based
on potential future intake.  Pupils may miss opportunities to develop wider skills for
life in particular with limited immersion and interaction with a wide range of peers
- levels of attendance and participation may also impact further on this. 
4.17 Keith Primary has capitalised on its easier access to local groups and employers to
provide opportunities for pupils to develop their understanding of the world of work
and volunteering.  Over the past year or so, SSEN have run workshops in school for
youngsters to explore robotics, Chivas has worked with groups of pupils on the
diversity of roles available in the food and drinks industry in Moray.  Loganair has
visited the school to talk about skills and careers in the airline industry and to
develop team-working skills.   
4.18 Collaboration with the wider staff in order to ensure a coherent and progressive
curriculum can prove more difficult in a school with low roll-size.  A progressive
curriculum differentiated to meet the needs of each child with a focus on engaging
and active learning experiences is in place in Rothiemay, with opportunities for
personalisation and choice across the four contexts for learning.  Rich contexts for
learning include extensive use of the outdoor areas at school and in the wider
community.  Many of these activities are built on pupil-voice through the school
council and young people with leadership roles. At Keith Primary, the staff have
worked together to develop a curriculum that makes best use of their 21st Century
facilities – with learning taking place outdoors, in the classroom and in the
dedicated breakout spaces – which all link together seamlessly.    This starts from
the moment they come in the doors with the use of Active Start Time.  Crossroads,
although in a rural setting, has more limited access to sustainable high quality
outdoor learning space than Keith and Rothiemay Primary Schools. 
4.19 Interdisciplinary learning is one of the key contexts for learning at both Keith and
Rothiemay Primaries.  At Rothiemay Primary pupil voice is used to plan a rolling
programme of group tasks, in the lower to middle stages class this is often
focussed on developing interpersonal and problem-solving skills though outdoor
learning – which has been supported through partnership with Tesco and the Parent
Council.   Pupils in the upper stages class worked with volunteers as the Spey Bay
Whale & Dolphin Centre as part of an interdisciplinary project on marine life - which
also includes links to DYW/Career Education.  At Keith Primary School, the daily
Active Start Time is used to bring together learning across subjects, apply it in new
contexts and consolidate learning before identifying areas to focus on in the future.   
4.20 Strong partnerships across the Keith Associated Schools Group exists with
previous joint working on moderation, numeracy, health and wellbeing policy and
wider curriculum development.  Most recently work has focused on Maths and
Page 111

Page 112

Numeracy, with agreed moderated assessments being in place across the ASG. 
The close proximity of Keith primary to Keith Grammar has allowed for very close
working between staff at these two schools - with teachers from the high school
visiting and taking classes at the primary in order to better understand the
approaches being taken to meet the needs of all learners in numeracy and
mathematics.   
4.21 Keith Primary has very strong links with Active Schools, enabling further
opportunities for children to engage in sporting and physical activities in groups
and teams.  This supports their health and wellbeing as well as development of
wider skills, while developing individual talents and interests through these wider
opportunities. Children achieve success through local and national competitions,
activities and events through active and enjoyable participation. 
4.22 Larger schools provide greater opportunities for pupil leadership and involvement
in the ethos and wider life of the school as well as provision of a wider range of clubs
and extra-curricular activities.  At Rothiemay Primary School, House Captains,
Vice-Captains and representatives are elected each year to lead houses, pupil
voice activities and inter-house challenges including sporting events, and
contribute to whole school change initiatives. Community groups can access Keith
Primary through the school let process. 
4.23 There are formal connections between Keith Nursery and Keith Primary, as they
share the same building, and between Rothiemay and its partner nursery which
support the transition of children into P1 at both schools. 
4.24 The range of interactions offered by all schools and the leadership and wider skills
development opportunities presented strengthen capacity to work with others as
part of a team, problem solve, make decisions and increase confidence in learners. 
As part of a peer group of a sufficient size, social interaction will enable further
development of skills for learning life and work and build self-efficacy and esteem. 
A school size low in pupil numbers, for example in a school of 10 or fewer children
based on potential future intake severely restricts opportunities for team sports,
meaningful pupil leadership opportunities, clubs and other active recreational
activities. 
4.25 ASN provision at Crossroads primary was very limited prior to mothballing, due to
the very small number of pupils at the school.   
4.26 Keith Primary School has the Primary Enhanced Provision base for children with
Additional Support Needs for the Associated Schools Group.  This gives young
people who need this level of support the opportunity to attend for part of the time,
also attending mainstream classes.  The school has a purpose built and fully
equipped additional support needs facility which includes a multi-sensory room, a
soft-play room, a life-skills room, as well as classrooms, a laundry, and disabled
shower facility.  It provides specialist support for identified young people and
Page 112

Page 113

support on group and one-to-one basis.  Multi-agency links are in place with key
partners including Health, Social Work and 3rd sector. The facilities are managed
by a PT ASN as part of a wider Support for Learning teaching team (4.0FTE) and
receives appropriate PSA time allocation based on moderation of pupil support
needs – this allows for extensive collaboration with class teachers and regular
intervention where required.  At Rothiemay Primary School, class teachers support
all children where required with support assistant input for targeted need. The
school also has 2 days of dedicated ASN teacher time along with PSA/CA hours
with allocation based on need.   
4.27 All schools within Keith Associated Schools Group benefit from their location in an
area of outstanding natural beauty with access to extensive countryside.  The
nationally significant River Isla flows through Keith and Rothiemay is at the
confluence of the Rivers Isla and Deveron – both of these provide opportunities for
outdoor learning as well as access to partnership working with the Bogie, Isal and
Deveron River Trust.  The trust employs a biologist who has visited both schools to
work with youngsters. As a town school, Keith Primary School is in close proximity
to Keith Grammar School as the local secondary school, with access to a range of
external areas including a playing field, outdoor garden area and hard-standing
playground/parking area.  The campus currently houses a local authority and
partner nursery.  Also sharing the campus is the swimming pool, community sport
facilities and a second, larger multi-use games area. 
4.28 Rothiemay Primary School enjoys large grounds with hardstanding areas, outdoor
classroom/shelter, a large playing field, trim trail, quiet garden, a range of play
equipment and seating areas as well as a small area of woodland on site.  The
school is close by the River Deveron which has large areas of accessible riverbank
that can be utilised for nature walks – and is a core component of the school’s
values – which spell out ‘RIVER’.  Groups of children are actively involved in
gardening projects at various points in the curriculum.  During snowy weather, the
local community park nearby has a hill next to the school is used as a sledge run as
well as a play-area, tennis court and football field for when the sun shines.     Keith
Primary School has an area of hardstanding adjacent to each classroom with direct
access from the room.  Outdoor areas are resourced with age-appropriate
materials to stimulate learning.   The wider grounds include further areas of
hardstanding and a multi-use games area (MUGA).  These areas are zoned, some
separated by high fencing to allow the older/stronger pupils to play football,
basketball etc without impacting on the younger ones.  These team sports and
game-based activities can be maximised with the number of pupils on the roll of
both schools enabling such activities. A larger staffing complement and parent
body further increases the likelihood of interested adults leading a broader range
of activities (for example both Rothiemay and Keith primaries have had parent
support to run jogging clubs). Keith Primary has access to a large area of playing
fields belonging to the adjacent high school, as well as a small area of woodland
on site. Staff in school make use of the Keith Community Minibus, which is based
on-site to facilitate trips to the local area – for example local beaches. 
Page 113

Page 114

4.29 The Scottish Government’s policy on Language Learning in Scotland: A 1+2
Approach is aimed at ensuring that every child in Scotland has the opportunity to
learn a modern language from P1 onwards (known as L2).  Additionally, each child,
irrespective of ability should have the right to learn a second modern language from
P5 onwards (known as L3).  Opportunity to learn a second modern language is
strengthened through pupil peer support in learning a first or second language with
opportunity for stage appropriate paired and group activities, including rotation of
participants where needed to extend language acquisition through listening and
talking, reading and writing based activities.  In a larger school, staff peer support
for languages teaching and building staff confidence in delivery to specific stages
is strengthened where stage partner planning is supported as well as in delivery of
appropriately challenging stage appropriate group and paired learning activities. 
This may not be possible or more complex to plan for, where there are very low pupil
numbers within specific stages (for example in P5-P7) in a smaller multi-stage
composite school and class environment where the school size means that there
are low pupil numbers to support activities as outlined above. 
4.30 Rothiemay Primary benefits from a very small amount of Pupil Equity Funding and
uses this creatively to support identified children, with interventions reaching
further than those where impact is directed.  Keith primary has a much larger
allocation, which it uses to run a whole school resource (The Oak Room).  This is
staffed by PEF-funded support staff undertaking Literacy interventions and
Numeracy interventions as well as work to improve confidence and social skills as
part of identified pupils’ Health & Wellbeing development.  Staff within this
provision have successfully supported young people in gaining Hi 5 awards.  Keith
Primary uses its profiling information to focus the application of PEF funds on
supporting pupils to seek out new opportunities and challenges.  This might be by
directing and supporting youngsters to opportunities that already exist or offering
new ones – recent examples include Mixed Martial Arts training, swimming and
visiting local beaches. 
4.31 Keith and Rothiemay Primary Schools both have Parent Councils (both use
alternative names) formed who meet regularly throughout the year.  Both Parent
Councils represent the views and interests of parents and pupils and support
school improvement.  There is a very strong sense of community in both schools,
enhanced by the fact that a number of teaching staff and almost all support staff,
live within the community.    Sustainable partnerships with parents and the wider
community further enrich the curriculum and children are supported to take an
active part in the school and wider community. 
4.32 At both Keith and Rothiemay, active and supportive Parent Councils fundraise for
school trips and activities and also contribute to providing resources – for example
outdoor learning equipment.  As well as direct fundraising, they have successfully
applied for funding through third parties (like local supermarkets and businesses). 
At Keith Primary parents have been active in supporting the school’s work on DYW.  
Page 114

Page 115

If Crossroads were to re-open then there would be potential for a Parent Council to
operate.  However, with a small pupil cohort there would be a limited number of
families able to participate – particularly where sibling groups may feature –
resulting in greater reliance on a few individuals to support the school in this way. 
4.33 Keith and Rothiemay Primary Schools are central establishments within their
respective communities.  Keith primary has with strong links to other organisations
including local churches, local businesses and pre-school providers.  Rothiemay
Primary is the only Moray Council building in use within the village of Rothiemay. 
Along with the Church, Village Hall, Community Playing Fields & Pavilion and Hotel
it is the focus for almost all community activities. 
4.34 Section 3 of the Standards in Scotland’s Schools etc Act 2000 requires local
authorities to endeavour to raise standards and secure improvement in the quality
of school education provided in our schools for all learners.  It is Moray Council’s
view that the pupils from the Crossroads catchment derive educational benefits
from their current attendance at other larger neighbouring schools. Formalising the
current arrangements would provide a number of such benefits, judged against
both the Moray and National criteria set out above. 
4.35 As all pupils from the Crossroads Primary School catchment currently attend Keith
Primary School, Rothiemay primary School or St Thomas’ Primary School
depending on current zoning arrangements or parental choice, no adverse effects
for those pupils are expected to arise from the permanent closure of Crossroads
Primary School. 
5 Public Engagement 
Public Meetings 
5.1 Parents/carers and the wider community and stakeholder groups were invited to
discuss the proposal at one of the two public meetings planned, or at a planned
third online meeting which were scheduled to be held during the consultation
period. 
5.2 The first meeting, open to all the community, took place at the King Memorial Hall,
Grange, Keith at 6:30pm on 22 October 2024. It was attended by 9 members of the
community, 2 local councillors and representative of Education Scotland.  The
record of the meeting is attached as Appendix B. 
5.3 The second meeting, for current and future parents and carers, took place at Keith
Grammar School, School Road, Keith at 7pm on 24 October 2024. There were no
attendees at this second meeting. 
Page 115

Page 116

5.4 A further online meeting was planned for 23 October 2024 at 7pm but there was
no stakeholder interest in attending.  
5.5 During the meeting on 22 October 2024 there were questions and comments
regarding: 
• The past investment in the school by the Parent Council in ICT and outdoor
equipment and furniture
• Costs of reopening the school following mothballing
• Process should the school close
• Communication with parent/carers during the pre-consultation
engagement
• Access to Council-provided transport for Crossroads catchment children
already attending Keith Primary School
• Impact on Rothiemay school roll
• No option proposed to rezone to Newmill Primary School 
Discussion with Pupils 
5.7 As part of the consultation process, survey questions were shared with Head
Teachers at Rothiemay, Keith, Newmill and St Thomas’s primary schools to allow
them to discuss the proposal regarding the closure of Crossroads Primary School
with their respective pupils.   
5.8 Keith Primary School has 13 children from the Crossroads Primary School
catchment on its current school roll, Rothiemay has 5 children from Crossroads
Primary School catchment and St Thomas’s has 3 children from the Crossroads
Primary School catchment. 
5.9 A full breakdown of the pupil responses is at Appendix C. Within the responses a
number of children expressed support in Crossroads Primary School re-opening
but almost all of these expressed their preference would be to remain at their
current school if it did.   
Consultation Proposal Survey 
5.10 During the consultation period parents/carers, stakeholders and community
members were invited to take part in an online survey to express their opinion on
the proposal. The survey provided a summary of the proposal regarding the closure
of Crossroads Primary School.  Participants were also given the opportunity to
leave comments regarding the proposal. 
Page 116

Page 117

5.11 A total of 50 people completed the survey (46 online and 4 paper copy) and a
collation of their direct responses is provided at Appendix D.  An analysis of the
online survey is at Appendix E.  The analysis of the responses highlighted that 40%
(20) of responders resided within the Crossroads Primary School catchment, 38%
(19) of responders from Rothiemay Primary School catchment and 22% (11) of
responders from Keith Primary School catchment.  The high-level outcome from
the online survey was that 24 responders supported the closure of the school, 19
disagreed and 7 did not respond to the specific closure question. 
5.12 Of the 30 parents/carers that completed the online survey, 13 supported the
proposal and 13 disagreed and 4 did not respond to that question. Within this
group 15 identified as from the Crossroads catchment and 6 supported the
closure, 6 did not and 3 did not respond.   
5.13 Of the 43 respondents who responded to the question “which option do you prefer
for the proposed catchment” in the school were to close, the most popular option
was Option 2, to close Crossroads Primary School and split the current catchment
between Keith and Rothiemay. This was supported by 29 (68%) of the 43
participants who responded and 10 (33%) did not support it. Four people did not
indicate a preference. 
Staff Engagement 
5.20 As Crossroads Primary School has been mothballed since 9 January 2023,
teaching staff that were employed at the school have been employed at other
establishments.  Staff at Rothiemay Primary School and Keith Primary School were
given the opportunity to discuss the proposal with Education Scotland but none
chose to do so.
6 Written Responses  
6.1 During the consultation period between 23 September 2024 until 15 November
2024 representations were invited from statutory consultees and interested
parties.
6.2 The only written communications were completed paper copies of the online
survey made available to the community and these are accounted for in the survey
analysis in Para 5.11. 
7 Moray Council Response to Written (Survey) and Oral Representations   
Page 117

Page 118

7.1 The comments received during the consultation period fall into several themes.
These have been carefully considered and the Council responses to these are
provided below. 
The whole process from mothballing to statutory consultation was not well
managed 
7.2 A comment was received that the consultation process was not handled well 
“they had absolutely no confidence in the council” managing it   
7.3 Moray Council do not agree with the assertion that the consultation process was
not managed effectively. Several public engagement events were completed prior
to the Education, Children’s and Leisure Services Committee report seeking
approval to undertake a statutory consultation regarding the closure of
Crossroads Primary School in accordance with the School
(Consultation)(Scotland) Act 2010. 
7.4 At these pre-consultation meetings the next steps in the mothballing and future
proposals consultation process were discussed and members of the community
were able to ask questions and contribute. In addition to these public meetings,
suggestion boxes were positioned around the catchment to allow any interested
party to comment on the future of the school.  This engagement information was
made available within the consultation proposal document at Appendix A. 
7.5 This consultation process has followed the process set out in the Schools
(Consultation)(Scotland) Act 2010 in engaging with all interested parties and
providing every opportunity for community engagement. This Consultation Report
is now made available to all interested parties to review prior to a Council decision
on the future of Crossroads Primary School planned for 21 May 2025.  Legislation
allows for any person to make representations to Scottish Ministers within three
weeks of the Council taking their final decision to implement a closure proposal.
The detail on the how to do this is at Para 12.5. 
Moray Council made no effort to ‘market’ the school to prospective new parents
and carers in the area 
7.6 A few comments were received that stated Moray Council could have made more
effort to promote Crossroads Primary School and encouraged in catchment
families to send their children to their catchment area school.    
7.7 Advocating for options that allow families to choose between small and larger
educational environments based on their children's needs was a common theme
throughout engagement and consultation on Crossroads Primary School and
wider Keith Associated School Group discussions. It is not appropriate for the
Council to advocate a child goes to one school as against another, although a
place will always be made available for a child at their in catchment school and
Page 118

Page 119

they may also be entitled to free school transport. Council policy supports the
principle of parental choice in school selection and allows parent/carers to submit
placing requests for children to attend a school out of their address school
catchment area. Provided the placing request meets the placement policy
requirements the Council will support the request. 
7.8 A number of parents stated that Keith PS was the preferred learning location for
many parents/carers who travelling to work in Keith or further afield and this is one
of the factors that influence parent decisions to send their children, as their
expense, to an out of catchment school. 
Proposal to close the school is financially driven 
7.9 A number of survey and verbal comments received during both the engagement
statutory consultation stated that Moray Council were seeking to close
Crossroads Primary School for financial reasons. 
7.10 Other respondents noted the financial implications of keeping Crossroads Primary
School open, citing low student numbers and high operational costs as key
reasons for supporting its closure. They argued that reallocating students to larger
schools would be more cost-effective. 
7.11 Although the Council acknowledge that there would be financial savings realised
from closing Crossroads Primary, we do not agree that this has influenced the
report recommendations which are only based the educational benefit rationale
set out in Section 4 of this report. 
Impact on Rothiemay Primary School 
7.12 Concerns were raised about the future of Rothiemay Primary School, with some
suggesting that merging catchment areas could jeopardize its viability as well,
especially given recent reductions in class sizes. 
7.13 The opinions of the adjacent Rothiemay community as well as the Crossroads
community have been considered in the recommendations of this proposal and
are not considered detrimental to the future of Rothiemay Primary School. 
Longer travel times to schools 
7.14 A number of responders highlighted the logistical challenges posed by longer
travel times to larger schools, with some children facing extended days due to
transportation arrangements. 
Page 119

Page 120

7.15 Children who have been temporarily rezoned to Rothiemay Primary School during
the mothballing of Crossroads Primary School have seen a slight increase in their
travel time of between 10-15 minutes. There may be disruption to travel in winter
due to challenging condition of rural roads, however, this is an issue whether
children attend Crossroads or Rothiemay primary schools now. 
7.16 The majority of children in the Crossroads Primary School catchment area already
travel to Keith or St Thomas RC primary schools so for the majority of current
primary school pupils will only be impacted by the additional time if the option for
free school transport is taken up. 
Concerns about children’s mental health 
7.17 Several comments opined on the mental health benefits for children attending
smaller schools, suggesting that not all children adapt well to larger educational
settings, which can lead to anxiety and stress.  
7.18 All schools in Moray are committed to ensuring children and young people are
supported in terms of their health and wellbeing, inclusion, equity and diversity in
order that they may thrive and succeed in individual schools as framed through
Our Moray Standard – Supporting All Learners strategy.  All schools and staff also
access mandatory training in order to support all learners across Moray Schools
including child protection, getting it right for every child, staged
intervention/universal and targeted supports for pupils, trauma informed practice,
relational approaches/solution-orientated practice, supporting neurodiversity
and inclusive classrooms (CIRCLE).  All approaches adopted across schools are
built upon the principles of inclusion and nurture, with Moray schools aiming for
all children and young people to be and feel present, participating, achieving and
supported in school.   
7.19 As a smaller rural school with roll of 47 pupils, Rothiemay Primary School’s vision
is ‘nurturing aspiration for learning, relationships and life’ where core values of
responsibility, inclusion, values, empathy and respect underpin all that the school
do in order to support all pupils.  The wellbeing indicators are central to school life
and staff have a range of qualifications and experience in identifying and
supporting children with a wide variety of needs.  The small staff team work
together in order to support all children, accessing external supports from multi-
agency partners and wider services where appropriate or required, in line with
agreed Moray approaches.   
7.20 Keith Primary School as a larger Primary School (334 pupils) are proud of their
community ethos and very much believe that a happy child is a successful one,
committed to providing a welcoming, safe and stimulating environment for
children to learn, where all are valued and nurtured in an inclusive environment
with equal opportunities.  Core values of aspirational, respectful, resilient,
Page 120

Page 121

inclusive and nurturing underpin the school’s vision where a larger team of staff
(teaching and support staff) ensure all pupils are supported in both their learning
and wellbeing.   
7.21 A dedicated Learning Support team also work closely with teaching and support
staff and wider agencies at Keith Primary School in order for targeted supports
(learning and wellbeing) to be provided in a timely way.  The Head Teacher at Keith
Primary School supported by two Depute Head Teachers and a Principal Teacher
of Support for Learning, form the Senior Leadership Team overseeing all pupil
learning and support needs, accessing wider services (e.g. multi-agency partners,
counselling) where appropriate following Child Planning meetings and Team
Around the Child discussions as would be the case in all schools where individual
pupils require further support.  As the school has an Enhanced Provision, it is
further able to provide support for individual pupils or small groups in a caring and
inclusive environment within The Beeches which emulates a small school setting. 
7.22 All schools in Moray work closely with a wide range of multi-agency partners
including educational psychology, health, social work and wider services (e.g.
Speech and Language Therapy, English as an Additional Language, CAHMS – Child
and Adolescent Mental Health Services).  Where targeted supports are required
for individual pupils - which may include wider mental health and wellbeing
concerns linked to anxiety or stress – these will be supported and put in place as
noted above, aligned to Moray Schools’ nurturing approaches and irrespective of
school context or size but based on individual pupil need.  All schools support
children and young people at key points of transition, whether moving between
stages, nursery to Primary, Primary to Secondary or between schools in order for
continuity in learning and in terms of health and wellbeing support.   Schools also
review individual pupil cases where specific needs are identified and may initiate
single or multi-agency Child Planning supported by a team around the child
concerned as required in line with Moray’s Staged Intervention model.   
Status of Parent Council funded school assets 
7.23 Several comments received requested information on what is the status of school
of items that had been purchased by the parent council. 
7.24 A number of assets were removed for safe keeping or for use elsewhere while
Crossroads Primary School was mothballed. This included the ICT equipment and
the outdoor pergola (at no cost to the school or Council) which were relocated to
Rothiemay so they could still be used by pupils from the Crossroads catchment.
Other items have also been temporarily relocated to Rothiemay and other schools
and an asset record has been kept during mothballing 
7.25 Should the decision be to close the school in the future, a managed process of re-
distribution or donation to other schools and community groups will be
Page 121

Page 122

implemented, with the priority on benefiting the Crossroads and adjacent
communities.     
Community support for a school is/was ignored 
7.26 There were several comments that opined that the community support for the
school was ignored by the Council during mothballing, public engagement and
consultation. There was support for the closure due to financial realities although
they expressed sadness over losing a school that has been a central part of the
community for generations, indicating a deep emotional connection to
Crossroads Primary 
7.27 The support for the school by a small but dedicated group within the community is
acknowledged. If there was a viable school roll at Crossroads Primary School (and
current policy is that operational viability is reviewed if a school roll falls below 15)
then re-opening the school would be a serious consideration. However, there is no
desire for more parents/carers within catchment, other than those whose children
were at the school at the time of mothballing to move their children Crossroads
Primary School were it to reopen. A school cannot reopen if it has too small a pupil
roll, no matter if there is a community desire for it to do so. 
8 Education Scotland Report   
8.1 In line with the Schools (Consultation) (Scotland) Act 2010, a report was produced
by Education Scotland on the educational aspects of the proposal.  The full report
is attached as Appendix F. 
8.2 The report from Education Scotland was prepared by His Majesty’s Inspectors of
Education (HMIs) in accordance with the terms of the Schools
(Consultation)(Scotland) Act 2010. The purpose of the Education Scotland report
is to provide an independent and impartial consideration on Moray Council’s
proposal to close Crossroads Primary School. 
8.3 HMIs considered: 
• the likely effects of the proposal for children of the school; any other users;
children likely to become pupils within two years of the date of publication of
the proposal paper; and other children and young people in the council area; 
• any other likely effects of the proposal; 
• how the council intends to minimise or avoid any adverse effects that may
arise from the proposal; and 
Page 122

Page 123

• the educational benefits the council believes will result from implementation
of the proposal, and the council’s reasons for coming to these beliefs. 
8.4 In preparing their report, HMIs undertook the following activities: 
• attendance at the public meeting held on 22 October 2024 in connection with
the council’s proposals; 
• consideration of all relevant documentation provided by the council in
relation to the proposal, specifically the educational benefits statement and
related consultation documents, written and oral submissions from parents
and others; and 
• visits to the sites of Crossroads Primary School, Keith Primary School,
Rothiemay Primary School, St Thomas RC Primary School, Keith Grammar
School, including discussion with relevant consultees, and a meeting with
Strathisla Community Council. 
8.5 Education Scotland also took account, in the event that the proposal was
implemented and there was a rural school closures, what the Council’s
consideration was for any reasonable alternatives to closure of Crossroads
Primary School and the likely effect on the local community. 
8.6 Education Scotland noted that if the proposal to close Crossroads Primary School
was agreed that the majority of stakeholders they spoke to would wish to see the
current catchment split between Rothiemay and Keith primary schools. This
would support the roll at Rothiemay Primary School.   
8.7 Education reported that for several stakeholders access to school transport was
an important consideration in regards to how the Crossroads catchment may be
divided up. 
8.8 Education Scotland reported that a number of parents/carers indicated the
importance of parent choice and for children to being able to attend their nearest
school. 
8.9 Education Scotland are of the view that there are sound reasons for Moray Council
to consider the long-term viability of Crossroads Primary School. Inspectors
agreed that the proposal by Moray Council would result in educational benefits for
children in the Crossroads Primary School catchment area. 
8.10 The report highlighted that children currently benefit from working with larger peer
groups aligned to their age and stage. 
8.11 The report concluded that the predicted school roll in the wider area makes it
unlikely that all four primary schools affected by this report could be sustained.   
Page 123

Page 124

8.12 Education Scotland noted that most stakeholders who spoke to them supported
Option 2, the rezoning of the catchment area between Rothiemay and Keith
primary schools.  
8.13 Education Scotland noted that the mothballing and proposed closure of
Crossroads Primary School is seen as a loss to many in the community but those
in the community they spoke to acknowledged that it was probably the best option
given the small numbers of families who had indicated in interest in sending their
child to the school in the event it would reopen and recognised that the Council
should make best use of its resources.  They highlighted that if the proposal to
close the school goes ahead, the community felt that the school site should not
be left to deteriorate but quickly be made available for other purposed such as
housing or business use. 
8.14 Education Scotland noted some slightly increased travel times (10-15mins) for
those children who are temporarily rezoned to Rothiemay Primary School as a
consequence of mothballing Crossroads Primary School. They noted that the
majority of primary school children in the catchment were already travelling to
schools in Keith so their travel are not impacted by either the mothballing or option
to close Crossroads Primary School.           
8.15 The Council welcomes the Education Scotland report and accepts its findings. In
response to the findings within the report, Moray Councils response is as follows: 
• The Council welcomed that Education Scotland were in broad agreement
with the educational benefits in closing Crossroads Primary school as set
out in the consultation documentation and this report and considered that
Moray Council had made a reasonable case to permanently close
Crossroads Primary School. 
• The Council accepts the view of Education Scotland that a school roll of
fewer than 15 pupils is not, in of itself, a significant impediment to the
implementation of the Curriculum for Excellence and have omitted that
from the list of reasons for advancing the proposal to close Crossroads
Primary School.   
9 Alleged Omissions or Inaccuracies and Additional Information 
9.1 Section (10)(3) of the 2010 Act also places a requirement on the Council to provide
details of any inaccuracies or omission within the proposal document which has
either been raised by the consultees or identified by the Council itself.   
Page 124

Page 125

9.2 This section of the 2010 Act also requires the Council to provide a statement on
the action taken in respect of the inaccuracy or omission, or, if no action was
taken, to state that fact and why. 
9.3 Officers are required to publish its response to representations made during the
consultation period within its final Consultation Report.   
9.4 There were no areas identified by consultees as being inaccurate or omitted from
the proposal document during the consultation period. 
10 Compliance with Section 9(1) of the Schools (Consultation)
(Scotland) Act 2010 
10.1 Section 9(1) of the Schools (Consultation) (Scotland) Act 2010 states that: 
After the Education Authority has received HMIE’s report, the Authority is to
review the relevant proposal having regard (in particular) to    
(i) written representations received by the Authority (from any person)
during the consultation period, 
(ii) oral representations made to it (by any person) at the public meeting, 
(iii) HMIs report 
10.2 The feedback from the consultation, and all the questions and comments raised,
considered in detail by officers. Data and factual information was checked where
required and advice and input was sought from other Council Services where
needed to consider the issues raised. This ensured that the Council met the
requirements to review the proposal under section 9(1) of the 2010 Act. 
10.3 Officers of the Education Service and Education Resources and Community
Service have listened to the points made at the public meeting and have
considered equally carefully the written representations received.   
10.4 The Education Service’s position (as the Education Authority) is set out in Section
4 of this report. 
10.5 The educational benefits were reviewed in respect of the Education Scotland
report and representations made. Factors included in the Education Scotland
report or representations made requiring any aspect of the educational benefits
were considered.
Page 125

Page 126

10.6 There were no aspects included in the representations made which provided a
different conclusion in relation to the rural school factors. 
11 Compliance with Sections 11A to 13 of the Schools
(Consultation) (Scotland) Act 2010 
11.1 Crossroads Primary School is a remote rural school, therefore the Schools
(Consultation) (Scotland) Act 2010 requires the Authority to have special regard to
the following factors: 
(a) the likely effect on the local community in consequence of the proposal, 
(b) the likely effect caused by any different travelling arrangements that may
be required in consequence of the proposal. 
Likely Effect on the local community 
11.2 Crossroads Primary School has mothballed since January 2023.  The Council
acknowledges that Crossroads Primary School was a sustainable learning
community in 2020 with the school roll forecast data indicating it would average
around 15 pupils for at least the next 7 years. However, over the next 2 years, with
an increasing number of out of area placing requests, the annual school roll
forecast indicated that the future roll would not exceed 10 pupils and with the
actual school roll falling to 4 at the start of the 2022/23 academic session the
mothballing decision was taken.   
11.3 During the engagement and consultancy process surrounding the future of
Crossroads Primary School full endeavours have been made to ensure all
residents within the catchment area have been communicated and consulted
with to ensure that the impact on the community is understood by officers. 
11.4 Prior to launching the statutory element of the consultation, opportunities were
made available to all members of the community to either suggest ways to make
the school viable again or alternative uses for the building that would benefit the
community. 
11.5 There were no suggestions from the engagement and consultation that could be
seen as ways of ensuring a viable future school.   
11.6 Alternative uses for the building and land proposed during engagement and
consultation will be shared with Council Estates Management officer and
Community Support Unit team to consider as future options for the school
buildings and land in the event of school closure. 
Page 126

Page 127

11.7 Title deeds have recently been received for the land and buildings that encompass
the Crossroads PS estate. The title contains reversionary rights in favour of the Earl
of Fife or his successors (the original owner).  The deeds state that if the land,
including the school buildings, are no longer used for educational purposes, the
successors of the Trustees of the Earl of Fife can require the land to be returned to
them in exchange for payment of the current value of the school buildings.  Any
proposal for alternative use will not be possible without the Council first checking
if the current Earl of Fife wishes to exercise his reversionary rights. If those rights
are exercised the Council will seek to engage with the ‘owner’ on options for
community use or economic growth benefits for the site. 
Likely effect caused by different travel arrangements  
11.6 Children who have been temporarily rezoned to Rothiemay Primary School during
the mothballing of Crossroads Primary School have seen a slight increase in their
travel time of between 10-15 minutes. There may be disruption to travel in winter
due to challenging condition of rural roads but this is an issue  whether children
attend Crossroads or Rothiemay primary schools now. 
11.7 The majority of children in the Crossroads Primary School catchment area already
travel to Keith or St Thomas RC primary schools so travel time is not impacted by
either the mothballing or closure of Crossroads Primary School. 
11.8 Since January 2023 free transport has been provided to those children in the
Crossroads Primary School catchment that were temporarily rezoned Rothiemay
Primary School. Prior to, and during mothballing, no transport has been provided
to those children in the catchment that were and continue to attend Keith Primary
School. 
11.9 The rezoning proposals in both Options 1 and 2 to this closure proposal would see
free transportation now available to both Rothiemay and Keith primary schools
within their respective extended catchments. This will immediately benefit most
children in the catchment area who already attend Keith Primary School.   
12 Representations to Scottish Ministers in terms of Section 15 of
the Schools (Consultation) (Scotland) Act 2010 
12.1 If the Authority makes a final decision to implement the proposal, it will require to
notify Scottish Ministers of that decision and provide them with a copy of the
proposal document and consultation report.  This must be done within six working
days of the decision.  Scottish Ministers have an eight-week period from the date
of the final decision to decide if they will call-in the proposal. 
12.2 Within the first three weeks of that eight-week period, Scottish Ministers will take
account any relevant representations made to them.  Until the outcome of the
Page 127

Page 128

eight-week call-in process is known, the Authority cannot proceed to implement
the proposal. 
12.3 If Scottish Ministers call-in the proposal, they must refer the proposal to the
Convener of the School Closure Review Panels who may refuse to consent to the
proposal or grant their consent to the proposal subject to conditions or
unconditionally. 
12.4 It should be noted that the legislations allow for any person to make
representations to Scottish Ministers within three weeks of the Council taking their
final decision to implement a closure proposal. Moray Council expect the decision
on whether or not to implement this closure proposal at is meeting on 21 May 2025.
If the decision is taken to implement the closure proposal, any representations to
Scottish Ministers, therefore, in this context need to be with the Ministers within
three weeks of this date. Therefore, any representations must be made to Scottish
Ministers by 12 June 2025. 
12.5 Anyone wishing to make representation to Scottish Ministers during the three
week period referred to above should do so by email to schoolclosure@gov.scot
or in writing to: 
The Scottish Government 
School Infrastructure Unit 
2A (South) Victoria Quay
Edinburgh EH6 6QQ. 
13.  Conclusion 
13.1  In review of the oral and written submissions to the formal consultation
and survey results, it is clear that there is majority stakeholder support for the
proposal to close Crossroads Primary School.  
13.2  Officers have carefully considered the opportunities, issues and
challenges identified by stakeholders during both the informal engagement and
formal consultation processes. 
13.3  The Council now has the following options: 
• Adopt the proposal to close the school; or 
• Amend the proposal in a minor way; 
• Amend the proposal significantly and undertake a further consultation exercise
on a new proposal; or 
Page 128

Page 129

• Withdraw the proposal and maintain the status quo. 
Each option is discussed below. 
Adopt the Proposal 
13.4 If the Council chooses to adopt the proposal and close Crossroads Primary School
on a permanent basis then one of the two options for Crossroads Primary School,
outlined in the proposal document, would need to be chosen. 
13.5 The favoured option amongst survey participants was Option 2, to close
Crossroads Primary School and split the current catchment between Keith and
Rothiemay.  This option was supported by 29 (67%) of the 43 participants who
responded to this question in the survey.  The Council position is that this Option
would most align with the current parental choices to send their children to either
Rothiemay or Keith primary schools.        
13.6 If the Council adopts the proposal, it would be on the basis that it aligns with the
wishes of the majority of current parents/carers in the Crossroads Primary School
catchment AND that the educational benefits set out in the proposal document
would materialise and a period of uncertainty for the community would come to
an end.  Children will have access to greater learning opportunities and
experiences and increased socialisation through being part of a larger school. 
Opportunities to participate in peer support, classroom learning, learning groups
across stages and between classes and opportunities to engage in lunchtime,
after school and team events will be increased.  The primary schools of Keith and
Rothiemay have the capacity to accommodate additional children. The proposal
will assist the Council to deliver ‘Best Value’ through making more efficient and
effective use of its resources. 
Amend the proposal in a minor way and adopt 
13.7 During the consultation period no suggestions were received from stakeholders
that would require a minor amendment to the proposal. 
Amend the proposal significantly and undertake a further consultation exercise
on a new proposal 
13.8 The Schools (Consultation) (Scotland) Act 2010 requires that changes to the
school estate are subject to rigorous statutory consultation.  Any significant
amendments to the proposal would require a full consultation with pupils,
parent/carers and the wider community of all affected by the proposed schools. 
Page 129

Page 130

13.9 Allowing for appropriate governance the process can take in the region of nine
months to complete.   
13.10 This is considered to be unreasonable to go through another lengthy statutory
process.  The uncertainly surrounding the future of the school has impacted on the
community and it is hoped that this statutory consultation to close Crossroads
Primary School will give clarity to the community and a sense of certainty
regarding their children’s education. 
13.11 Having reviewed the Education Scotland report and feedback from consultees,
officers concluded that the basis of the original proposal continues to be the most
appropriate conclusion for Crossroads Primary School. 
Withdraw the proposal and maintain the status quo 
13.12 This option would be to continue to mothball Crossroads Primary School. 
Maintaining this status quo would continue the uncertainty for parents/carers,
children and the wider community.  The school would remain mothballed and the
building would continue to draw on Council revenue finances and require
additional significant capital investment in the future to be upgraded to Condition
B status.   
13.13 Withdrawing the proposal, the Council would be failing to recognise or respond to
the educational and social benefits for Crossroads catchment children. 
Education Scotland has recognised the proposal has the potential to deliver
overall educational benefits for the children within the Crossroads catchment
area.  Children are currently benefitting from working with larger peer groups
closely aligned to their age and stage. 
14 Recommendation 
14.1  The recommendation of officers is that the Council should adopt the
proposal to permanently close Crossroads Primary School and re-assign its
catchment area between Keith and Rothiemay primary schools.  Children
would continue to receive free school transport to their catchment school in
the case of Rothiemay Primary School and those children in the rezoned Keith
Primary School catchment would be entitled to free school transport from the
earliest the start of the 2025/26 academic year.   
Page 130

Page 131

Crossroads Primary School Closure Proposal
Public Meeting
Date: 22 October 2024
Time: 18:30
Venue:  King Memorial Hall, Grange
In Attendance:  Andy Hall Programme Manager Learning Estate; Stewart McLauchlan Quality Improvement
Manager; Jane Martin Community Support Officer (Learning Estate); Pragya Rathore Communications and
Engagement Officer; Alona Murray HMI Education Scotland; Cllr Colyer and Gatt arrived at the end of the
meeting
Attendance:  9 Community Members
Meeting Notes
Andy Hall gave introductions and gave a 12 slide PowerPoint presentation on Crossroads Primary School
Closure Proposal. 
• Consultation process based around 2010 school act – statutory consultation – process open, robust,
transparent and fair
Consultation Survey is open until from Monday 23 September 2024 to Friday 15 November 2024
Outline of consultation process in terms of if there are any alternative reasons to proposal to rezone
Specific requirements for rural school - 3 key impacts:  Education Benefits, Community Impact,
Impact on travel arrangements
• Background in consultation document
2022/2023 – academic session – roll was down to 4 in January 2023, school was mothballed
Most children (25 in catchment) either already had placing request for KPS or St T – temporary
rezoned children remaining in school to Rothiemay PS
Community engagement on the school in May and November last year (2023)
Approval for statutory consultation through ECLSC – 17 September 2024
• Options:
Alternatives to closure
Proposed options
Discounted options
• 2 options – closure and rezone to Keith Primary School or close and split rezone to Keith Primary
School and Rothiemay Primary School
• Public Submissions Consultation document – can be accessed via website e-mail addresses, search
for Crossroads Primary School Moray Council – link to learning estate page
Discussions
No discussion points at this time from attendees
No questions from attendees at this stage
• Next Steps Consultation concludes on 15 November (Phase 2)
• Education Scotland on submission of consultation and other documentation, they will prepare
report on the educational aspects of the proposal (3 weeks)
• HMIE visit – December 2024
• Meeting at all schools
• Prepare and publish consultation report (Phase 4) – up to ECLSC on 18 February (will go live a week
before this)
• Decision process (Phase 5) – 28 Feb 2025 ECLSC decision will go to full council on 26 February and
notify Scottish Ministers with 6 working days
• Closure decision then sits with Scottish Government – 3 weeks to make initial representation to
Ministers and further 5 weeks for Ministers to decide whether or not to issue a call-in notice.  During
APPENDIX 1 (APPENDIX B)
Page 131

Page 132

8-week period the Authority cannot proceed to implement any proposed closure (would be later in
2025)
• School Closure Review Panel – if Ministers call in, can take max 9 to 17 weeks
• Non-closure decision – restriction on closure for 5 years
• Elected members involved throughout and communicated with, based on outcome
• Presentation ended – open for questions
Discussions
If decision is made that school will
reopen, what about equipment that has
been removed?  
What about the computer?
What happens if decide to reopen?
Mothballing can take a long time and main item is Pagoda. 
Agreed with Parent Council and parents moving to Rothiemay –
looking to move to Rothiemay for children moved to Rothiemay.
If school reopens, that would be returned.
Anything perishable, has been cleared/removed – amplifier has
gone to Keith Grammar on an asset register and if school
reopens, will be returned.
Nothing removed unless agreed.  Andy visited CPS 4 weeks ago
and check on wind/watertight.
Computers – due to conditions/temperature – older buildings
do get damp and cold, on an asset register, some to Rothiemay,
some at HQ and also will be returned if needed.
Tablets would be returned where required.
Parent Council has paid a lot of money
over the years for that equipment too?
Rothiemay and remaining in school.  Pagoda moved to RPS –
other schools did not want further items.
How much would it cost to reopen the
school?
Over £200,000 over next 5 years to meet B condition/suitability
standard
Would it have cost more to remain
open?
Still costs linked to running/maintenance.  Around £130,000 of
revenue being saved currently that can be reinvested in
Learning Estate
Pulled the heart out of Grange – was a
social centre and little social events
that school Parent Council provided for
farming families who don’t have
opportunities to go in/out of Keith,
Elgin, Inverness etc – little things that
count – children from smaller schools
have better manners, more respect –
bigger schools don’t even mix
Operational decision is taken when school roll drops to 15 –
peer interaction is an issue and not a decision taken
independently
When roll drops, parents will take children out of school and
when children move on from Primary to Secondary
4/5 of parents already sending children to Keith Primary School
–parents attracted to this
What sort of impact is the new housing
estate on Keith Primary/size
Seeing falling birth rate in Moray, no issues with school rolls
(any) – a number of schools operating below capacity
Catchment Will depend on consultation and next steps
Costs – all about saving costs – teacher
redeployed from that school and
changes will depend - 
Linked to processes and staffing/change in roll and parents
opting to put their children to other schools (parental choice)
Suggested that Crossroads was not
used by other groups – e.g. Yoga,
Knitting – use of building always
refused
Very few Primary Schools have any school lets – linked to costs
–were paying around £70,000 per year across schools and
Council reviewed and only larger venues used (more of a
let/lease to use).  About cost of operating facilities – issues in
past, keys available to community and issues around insurance
and risk assessment, H&S, risk – across all Primary Schools
Page 132

Page 133

Suggest that smaller schools don’t gain
anything by having a Parent Council –
small number of children in schools
who have siblings, older sibling at
Grammar – not as much interest or
funds go to Parent Council.  Cash Book
– last 16 years – raised over £35,000
and used for opportunities,
experiences, travel?
Majority of parents in Crossroads catchment (out with this
consultation) chose to send their children to Keith Primary
School 
All consultations taken into account 
No plans to close Rothiemay Primary School – was due to SG
census and roll that class number/teachers reduced 
Money it will cost to reopen the school
– concern that the school is now an
eyesore and playground/weeds – not
nice to look at and even if it closes, is
there something to be done with it?
Wider learning estate has 30 schools below standard 
Not unique the school is showing its age/needs investment 
Moray Council has neglected school estate due to other
financial pressures – will not go away 
With respect to outside – not being maintained and lands and
parks at Council have been instructed to tidy grounds – should
be being addressed now (being assured this is being done) 
Defibrillator – kept on side of building, not taken away, power
source retained
Rothiemay census brought up The decision to adjust class numbers aligns with national and
local authority guidelines following Census Day set nationally
each September. This data is used every year to ensure equity
across Moray schools by allocating staffing according to pupil
rolls. 
Rothiemay is one of several schools impacted by the latest
census figures, resulting in these adjustments.
Telephone box removed Concerned it was removed acknowledged and noted but not
the Council who did this (BT)
Concern around toilet block/dampness Lowest setting of heating – no damp noticed, will keep an eye,
janitor goes in once a fortnight (KGS) to check the school and
checks for this to see there is no evidence of damp
If school does close, what is the
process
No presumption of closure – a number of options put forward at
public meetings last year too 
Opportunities for asset transfer etc covered last year
If was to close, how long before a
decision made with building
If building were to close, ceases to be a school 
Asset Management team then takes on – legal process and
likely 6-12 months before anything happened 
Will maintain as wind and watertight due to building value
Would the council be better moving
things in playground 
Local schools and play team have been approached and did
not want – will review taking e.g. Goalposts in to the building 
All usable equipment taken away by Rothiemay – concern that if
we start disposing of things, then concerns raised (as with if
they remain where they are) at this stage
Observation – meeting last year, similar
meeting and not minutes
Obliged to send postal letters to all – all sent on same day from
the mail room
Page 133

Page 134

Engagement session 
Concern that parents left e-mail
addresses at last session – sometimes
mail taking a couple of weeks.  An e-
mail before other people would have
been asked for 
Feel annoying that general public are
being told before parents
Confirmed that mail all sent out at same time to everyone
How many pupils in catchment just
now that could go to Crossroads
26 – school catchment (21 go to Keith)
Majority of those parents choose to go to Keith
School roll effectively 5 – children currently zoned to Rothiemay
Concern that people allowed to build
houses in Grange 
House building – uncertain at change in roll 
Parental Choice as to where parents put their children 
Majority of parents in Crossroads have and continue to put their
children to other schools (mainly Keith Primary School) 
Not removing Parental Choice – school roll falling and down to 5
(parental choice) 
Always the threat of closure – if threat,
won’t send child deliberately there?
Noted
One parent – child was in a class from
P1-P7 at CPS previously – not best
experience
Explained that roll had dropped to 5 – same issues around
Education Benefits (one parent’s child was in P1-P7 and not a
good experience, out doing learning support some pupils 1:1
etc) – same as if school were operating with e.g. 5 pupils as
before
If pupils currently going to Keith Primary
just now, do they get transport (from
Crossroads)?
No transport provided to Keith Primary from Crossroads
catchment 
Depending on catchment zone, children would be entitled to
catchment 
Those still going to Rothiemay (who were at Crossroads as
mothballed) would still
Big houses for sale – more children
coming in?
Can’t plan on what might happen – need to look at current
situation 
Looking at costs and cost savings – 21 children if school
rezoned would be entitled to school transport
21 parents fault school is shutting Choosing to put their children to Keith Primary School
4 miles from Newmill – 10 miles from
Rothiemay – why some areas not zoned
to Newmill
Parents suggesting Newmill as option 
Currently, no pupils attending Newmill and was no previous
desire to attend – not put forward as option 
Maps – pains that our children –
supporting the local school and
appreciate it needs mothballed – feel
forced to choose different school and
people who closed the school (didn’t
Parent raised concern that in future if rezoning happens parents
who send their child(ren) to Keith through parental choice and
having no involvement with Crossroads have led to closure –
parent felt it unfair that they would potentially receive free travel
in future to Keith Primary
Page 134

Page 135

put their children to Crossroads but put
to Keith and had to transport) are now
going to get free transport.  Chose to
put children previously to Keith –
reasons why mothballed and now
getting school transport handed on a
plate (extra 21 pupils to transport)
Will transport pick up at pupil doors –
will depend on outcome and transport
would review this
Parental choice – not England, we allow parents to send
children to school of choice if there are spaces in the school.
Catchment zones and transport provision - 
Parents understand they are minority –
sadness about situation
Acknowledged/noted
No presumption of closure – scrutinise the Education Benefits statement and inform final report to
Committee – with respect to rural schools
16 pupils go to Keith Primary School, 3 go to St Thomas who are currently in zone (Jane confirmed from an e-
mail she had/figures on laptop she accessed)
Andy closed meeting 7.40 pm and asked for anyone to ask further questions, respond to consultation, any
further comments
Page 135

Page 136

Crossroads Primary School Statutory Consultation
Pupil Survey Responses
School Class Do you think Crossroads Primary School should re-
open? Why?
If Crossroads Primary School did re-open, would you
like to go there? Why?
What do you like about your current
school?  What would be different if
you had to go to Crossroads Primary
School
Keith
Primary
Focus group
of 12 pupils
from P4-P7
Yes – for people to live between here and Cullen. Saves
them travelling.
No – no point in it staying open. Costs lots of money.
Definitely not 9 
Probably not 3
Not sure 2 
Reasons against going to Crossroads: Less
equipment, staff, smaller school,Not so many friends
of your age group, Small playground, not so much to
do, The work would have to be at different levels in
the class, Could make the transition tricky going to a
small school to a big school especially with all the
different teachers. Might be a huge shock and feeling
crowded. 
Crossroads is close to a road.       
Reasons for:
No option of Active Travel if they had to go to another
school. Would have to go in a car, Staff would get to
know you well and your level 
Lots of people in our school – no so
many chances to make friends. Some
people wouldn’t like to be in the same
class as their brother or sister. 
The Beeches – lots of help for pupils
with needs
Lots of staff here
Different zones in playground – lots of
space. Proper place for football
Equipment and resources are good at
Keith Primary. The building is new and
doesn’t need repairs
Different teachers give you different
experience
Rothiemay
Primary
Crossroads
catchment
pupils
attending
RPS
Yes – it would be closer and not take us so long on the
bus.
Yes:  It’s closer to where I live.  It would be smaller
than Rothiemay.
No:  My friends are at Rothiemay.
Current School: Friendly  Kind teachers 
Big hall for PE I play with my friends
We have a big field.
Different: Everyone in one class P1-7 
We had an apple tree. We didn’t work
in a group. We worked on our own
most of the time.
APPENDIX 1 (APPENDIX C)
Page 136

Page 137

Crossroads Primary School Statutory Consultation
Pupil Survey Responses
School Class Do you think Crossroads Primary School should re-
open? Why?
If Crossroads Primary School did re-open, would you
like to go there? Why?
What do you like about your current
school?  What would be different if
you had to go to Crossroads Primary
School
Newmill
Primary
P6/7 Yes, So we have more schools, They can go to a
local/closer school
Wasting petrol to go to a school further away More
jobs e.g PSA, teachers
Waste of a building to sit empty
No – none of us live local to that school Current:  Friends Teachers our unique
style of learning (wall and pit) Building
Playground
If we went to Crossroads our school
would have less numbers our school
might be at risk of closing
St Thomas
RC Primary
P1-4 ½  of our class: We think it should be closed because
there is no point opening it if it will take too long to
have more children to go there. 
½ of our class: We think it should be open because
there were some children going there. Then it can grow
even bigger
Staff: We think it should be closed. Children need a
social education and having a small amount of children
will hinder their social development. 
2 out of 13 pupils would like to go there.
We already have friends at our schools, we would
miss them if we move to Crossroads. 
We like fun jobs and activities with all
our toys and teachers we aren’t sure it
would be the same at Crossroads.
Here we see our nursery friends, we
wouldn’t see nursery children at
Crossroads.  
Page 137

Page 138

Appendix D – Survey Direct Responses
Responder
Do you support the
closure of Crossroads
Primary School? Please tell us why you made this choice
Yes/No
1 No Taking the heart out of the community of Crossroads.  Also because moray Council have been
negligent in support & promotion of this school PARENTAL CHOICE has been removed.
2 Yes Due to the school not being used right now, if reopened a lot of money would need to be spent.
3 Yes The citizens of Moray also need to take some hard decisions when it comes to supporting the
council find and make necessary budget cuts to save Moray and reduces the deficit that the council
needs to make.  Have attended 2 meetings already and I would also support the difficult decision if
the council to mothballed and then possible closure of Botriphnie and St Thomas Primary Schools
due to overhead and grading of building
4 Yes Although in an ideal world small rural schools are beneficial to children and community.  Financially
in todays climate is  not a viable option when you look at cost per pupil (Paper Copy)
6 Yes The amount of pupils that would attend is far too small to make it financially viable, the cost to keep
the school open is massive. As a formal pupil moving from such a small school to Keith grammar
was a massive difficult step. 
8 Yes Running costs and cut backs need to be made.
9 Yes I was a pupil, a member of staff, a parent and I am a member of the community, it was heart
breaking to see this school close but realise realistically that the  school won't re-open as it all
comes down to MONEY! I would like to see the property sold on or something rather than see it
getting into an eyesore like it is
11 Yes We need to support our rural schools where learning is enhanced in many aspects.   Keith primary
has little capacity within the building where Rothiemay has room for pupils to attend
APPENDIX 1 (APPENDIX D)
Page 138

Page 139

12 No I feel that the council are encouraging small schools to close and direct everyone into towns. This is
not good for small communities and if they do close a small school they should redirect the
children to a similar neighbouring in school, where the children will thrive in smaller numbers. 
15 No It's truly heartbreaking to see such a wonderful school like Crossroads Primary being closed,
especially when it holds so many cherished memories for local families. For generations, this
school has been at the heart of our community, and its closure feels like the end of an era for
everyone who has been a part of it.    My daughter attended Crossroads from August 2021 until
December 2022, and the transformation in her during that time was remarkable. She had previously
attended a much larger school, where she felt like just another number. But when she moved to
Crossroads, she became a completely different child. She loved going to school, developed a
genuine passion for learning, and thrived in that close-knit environment. It was devastating for her
to leave when Crossroads was mothballed, and she was heartbroken to lose a place where she felt
so valued and supported.    I don't support the closure of Crossroads, although I understand why it
might seem like the council's preferred option. However, I am deeply concerned about the lack of
support given to smaller schools and the impact this has on children and families. Schools like
Crossroads offer something unique—an environment where children aren't just numbers, but
individuals who are known, cared for, and inspired. When smaller schools are closed, we lose far
more than just a building; we lose a vital part of our community, a place that fosters belonging,
continuity, and growth.    I believe that the council needs to recognize the profound impact that
schools like Crossroads have on children’s lives and on the fabric of our communities. Rather than
viewing them as just another line in a budget, these schools should be celebrated, supported, and
preserved for future generations. They have been, and continue to be, essential in shaping the lives
of countless children, and their closure is a loss that will be felt deeply by all who have been
touched by their warmth and dedication.
17 Yes School running costs too high; school too small for good social skills development of children 
20 No If the households supported this school there would be no need for closure as enough children in
the catchment area
21 Yes Unsustainable  Whilst there are many positives related to small schools, I still believe they have a
limited future
Page 139

Page 140

22 Yes A small school has no benefit what so ever for the children's social aspect, all my children go to
Keith primary school for this reason
23 Yes Childcare for after/before school and bus.   Plus I don’t want my children going to another small
school as such a big transition to secondary. Also Rothiemay has been so inconsistent with several
changes of staff.
24 Yes Yes, if it means keeping nearby rural schools numbers up and maintaining current class sizes.  
26 No I'm a teacher at KPS and a mother of 3 primary age children. Our classes at KPS are already really
big. At the moment we're working on embedding numeracy assessments, introducing Wraparound
Spelling, and leading the way in Moray schools with CYPIC Writing movement amongst so many
other priorities.  We're doing this with ASN inclusion, reduced ASN for the most needy, reduced or
no PSA support.    We're already trying our hardest to improve and raise attainment. Inspections in
most schools all the time and trying to get it right for our children. There's only so much we can do
that actually benefits these learners and their families. Further increase in class sizes with no
additional support and increased pressure to meet our professional expectations is just not 'Getting
it right for every child.'
27 Yes It is not financially viable to keep a school open when numbers are so low.  Pupils will gain both
socially and academically by attending a school with higher pupil numbers.
30 No To support Rothiemay 
31 No Children shouldn't have to travel more than 20 mins to school which some now may have to. There
may be demand in future for Crossroads, we are not getting it right for the next generation of Grange
children.
33 Yes Not enough pupils
36 Yes Keeping a school open for such a tiny population is a waste of money. It's far cheaper to move those
pupils to another school in nearby towns.
37 No I do not support closure of small country schools. Having attended one myself (with only ever
between 5-12 pupils) I cannot emphasise the importance  of them not just to the pupils but to the
wider community. The teachers too are always amazing. I think it’s a real shame the council are
closing crossroads school they should be ashamed 
Page 140

Page 141

39 Yes The cost of running a rural school for so few children is prohibitive. Travel costs will be significantly
less than cost of whole school staffing etc.
40 Yes Rothiemay primary school has just been told it is having to move from a 3 class school to 2 classes
as we were 1 pupil short on the day of the census.  We therefore need more pupils to move into
Rothiemay primary to move it back up to a 3 teacher school.
41 No If every child in the catchment area went to their zoned school, Crossroads wouldn’t have to be
closed. It’s unfair that our primary school children are picked up at 8am and don’t get home till
3.45pm so it’s a long day for them.
42 Yes Crossroads is very small, and the buildings are no longer fit for a modern education.  The size must
make the cost to run per pupil higher than larger schools and there are limited opportunities for
groupwork etc.  The roll at Rothiemay Primary is falling and has recently caused a move to from 3 to
2 classes - which is not desirable.  Any additional pupils that would help to reverse this trend would
be a help.
43 Yes Theres kids already at rothiemay from cross roads
45 No The arrangements made since the school mothballed have been nothing short of a joke, kids are
leaving as early as 8am to go to school and not returning until 4pm, there has been no consideration
or support for the children affected by the mothballing not to mention the issues with travel,
communication and education. 
46 Yes The amount of pupils that would attend, the age and current state of the building, lack of parking
and closeness to the road. Pupils would benefit from attending either Keith or Rothiemay where
there are better facilities, access to playgroup or nursery and larger peer groups and educational
opportunities. 
47 No If we keep closing schools and reducing classes we will soon end up like primary education in
England.  from experience not only does this kill the community, it reduces the incentive for new
families to move into the area, requires primary age children to take longer and longer bus rides so
lengthening their school day and puts increased pressure on the smaller schools around to
accommodate these children.  its a cost saving exercise to the detriment of children, as usual
50 No It was a fantastic school and academically the children are now suffering but then that never came
into the equation at all   
Page 141

Page 142

Responder
Do you
support the
closure of
Crossroads
Primary
School?
Do you think any of these options
should be discounted?  Tell us why you made this choice
Yes/No Option
1
Option
2
Neither Both
1 No x Common knowledge that pupils from small country schools are better
behaved, and able to interact with young and old alike.  Which many
young people are now unable to do.  This has been confirmed by staff
from large schools.
2 Yes x Parental choice where their child goes to school
6 Yes x Keith primary is better equipped to take the pupils. Rothiemay is a small
school which also likely needs a lot of money spent on it to keep it viable
8 Yes x Better road conditions in winter.
12 No x I have previous experience of a family members school being mothballed
and the change has been so harming to the child and he has lost out on 2
months of education for the most part as he cannot cope. There are
many other children who will not cope well with such a huge change
moving to a large school. The children in country schools have smaller
class numbers and should receive a much more one to one education as
the ratio of teacher to children is smaller. Please support keeping the
smaller schools open. Keep country kids in the country. 
Page 142

Page 143

15 No x I strongly believe that the Crossroads catchment area should be
designated exclusively as Rothiemay Primary School’s catchment area
and should not be split with Keith Primary, nor should it be absorbed
entirely by Keith Primary. Rothiemay Primary, as a smaller rural school,
offers a unique, high-quality educational experience that benefits from
smaller class sizes and a close-knit community environment—qualities
that are difficult to replicate in larger schools. Allowing Rothiemay to
encompass the entire Crossroads catchment would not only help
maintain its student numbers but also ensure that families in this area
have access to the exceptional educational opportunities that smaller
schools provide.    By splitting or transferring the catchment area to Keith
Primary, there’s a risk of further diminishing the numbers at Rothiemay,
which could jeopardize its future. It’s crucial that the council and the
wider community recognize the value of supporting and sustaining our
smaller schools, which play such an important role in rural communities.
Instead of directing students away, efforts should be focused on
promoting Rothiemay Primary and ensuring it remains a vibrant and
thriving choice for families within the Crossroads catchment area.
18 Yes x Rothiemay is also costing a lot to run and might be closed soon as well.
The children are taught in two classes only- not ideal. 
23 Yes x My children currently attend Keith primary school and I wish to receive
school transport if this is the case of them being entitled to 
24 Yes x I do not want my child to go to Rothiemay. If others have had a choice in
the past I expect the same. Parents need access to childcare!!!!
Page 143

Page 144

25 Yes x    I would prefer my daughter to be in a different class to her brother at
Rothiemay and for her to not be rushed into being in the upper stage
class before she feels ready. 
27 No x    This is hard because I don't know the situation in Rothiemay nor the
families affected and their needs.
28 Yes   x  It gives parents choices
31 No x    To give people the option to go to a good school
34 Yes x    Rothiemay primary needs more pupils to keep up their numbers 
35 No  x   moray council has just reduced rothiemay from 3 classrooms to 2 due to
one pupil. not one discussion with parents before doing this 
37 Yes   x  I fully support the closure of Crossroads primary school.
42 No    x I strongly believe if every child in the area went to their catchment school
Crossroads wouldn’t have had to close.
43 Yes   x  I think the location of dwellings and pre-school children and transport
options within the current Crossroads catchment should determine what
if any split should be made.  
44 Yes  x   Theres already a decent number of kids at rothiemay, and more kids
would keep it open. 
47 Yes x    I believe there should be parental choice in choosing whether you enrol
your child in a small or larger school. Some children benefit and thrive in
smaller schools where there is often a more nurturing environment. 
Page 144

Page 145

50 No    x I'm.not in agreement with the school closing at all, for one Kieth primary
isn't big enough despite being a new building !! And well rothiemay is
being made into a 2 classroom school which means they won't have the
ability to take much more pupils either so I honestly don't know what the
council is actually playing at 
Page 145

Page 146

Responder
Do you support the
closure of
Crossroads Primary
School? 
If you would like to make any other comments regarding the proposed closure of Crossroads Primary
School do so in the box below.
Yes/No 
1 No Mental Health - Not every child can integrate into large school.  Many blossom in smaller schools - 
enabling them to cope with Grammar School - long un-chaperoned journey to & from school cant help. 
Crossroads Parent Council have provided equipment, workshops for both staff & pupils, sports coach,
music teacher, French lessons, cycling proficiency, net ball & football clubs.  Theatre & Educational visit
& visitors - not to mention school & community social events.    Living in the country is a total different
world to the town and should be appreciated as such.
3 Yes No, difficult decisions need to be made
7 Yes Keith primary school is a preferred learning establishment for many parents and currently our children
are attending with us working parents travelling to and from the school each day. Personal preference to
Keith primary as more opportunity’s for children’s learning and social needs. 
12 No The children from crossroads school are all already attending Rothiemay primary and receive free
transport. By changing the catchment to Keith or part Keith this would be another huge change to the
children’s lives after settling in so well at Rothiemay. 
Page 146

Page 147

14 No Rothiemay Primary should not be reducing classes from 3 to 2 and it is thoughtless and unfair on the
children
15 No I do not support the closure of Crossroads Primary School, although I understand why this might be
seen as the more favourable option from the council’s perspective. However, I feel very strongly that the
Crossroads catchment area should be designated exclusively to Rothiemay Primary School and should
not be split with Keith Primary. More support is needed from local parents and the council to preserve
and promote our smaller rural schools, which offer such a high standard of education.    My daughter
attended Crossroads Primary and was heartbroken to leave such a wonderful educational environment.
She then moved to the equally lovely Rothiemay Primary. Although it took some time for her to adjust,
she is now happy and thriving in a larger, yet still small, school setting. However, due to a drop in just
one pupil, there have already been some changes at Rothiemay, and my daughter is now worried that
the same thing could happen to her new school. Our children should not be burdened with fears about
their school closing—they deserve to feel safe, secure, and supported in their learning environment.   
While I understand why some parents might choose Keith Primary due to the convenience of breakfast
and afterschool clubs—services that are invaluable for working parents—I question why these
amenities aren’t also available in our smaller schools. If such options were offered, I know I, along with
many others, would definitely make use of them.    Unfortunately, smaller schools are not receiving the
attention and promotion they deserve from the council, and as a result, their numbers are declining. If
this continues, we risk losing yet another wonderful local school due to budget cuts. I find the current
situation quite uncaring toward our future generation. It’s crucial that we prioritize supporting and
investing in these smaller schools to ensure they remain a viable and thriving option for families in our
communities.
Page 147

Page 148

28 Yes My husband and 2 of our children attended Crossroads Primary school but sentimentality and
handiness are not valid reasons for keeping it open.  Whilst I believe that my children received a good
education at Crossroads Primary School, it left them socially disadvantaged and slightly alienated
when transitioning from Primary to Secondary education which is why we chose Keith Primary School
when our third child came along and have never regretted that decision.
35 No give buildings back to community to use.
37 Yes Please close this school ASAP.
42 No Why is Moray Council paying Aberdeenshire schools for education and closing a school that could be
opened if everyone in the attachment area attended? 
43 Yes This has taken a long time coming, although educational benefits are clear to the closure, given the
state of Moray's finances, any similar cost-saving exercises should be accelerated.  
50 No I think this whole process has been a shambles from day one   Myself as a parent heard about this from
my nail technician !! Yes you heard right my nail technician as a member of your staff had informed
them months before that the decision had and was made to close this school   Now this alone Is
disgraceful and I have absolutely no confidence in our so called council anymore after this 
Page 148

Page 149

Appendix E Crossroads Primary School Statutory Consultation Survey Data and Analysis
Introduction
As part of the statutory consultation regarding the closure of Crossroads Primary School, stakeholders were invited to participate in an online survey to express their
opinion on the proposal. 
The survey was open from 23 September 2025 until 15 November 2024. In total, 50 survey responses were submitted – 46 were completed online and 4 printed copy
was received.
The survey data is presented in this. The survey responses are published in Appendix E
Summary of responses
• 50 people responded.
• The survey results revealed that 40% (20) of the respondents lived within the Crossroads Primary School catchment area, 38% (19) were from the Rothiemay
Primary School catchment and 22% (11) resided in the Keith Primary School catchment.
• Of these, 30 were parents or carers, 13 were community members, and 7 were school staff members.
• 19 have a primary aged pupil or younger child affected by the changes to Crossroads Primary School in your family.
• Option 2 (split catchment between Rothiemay Primary School and Keith Primary School) was preferred by 29 out of 43 people who responded to the preferred
school catchment area question.
• 24 people support the proposed closure of Crossroads Primary School and 19 are against the proposal. 7 people did not answer this question.
• 13 parents/carers supported the closure while 13 didn’t whereas 4 didn’t respond to the question.
• 6 Parents from Crossroads catchment area supported the closure whereas 6 didn’t support the closure.
Survey Data
Numbers of Respondents
1 2 3 4 5
In which Primary School catchment
area do you live?If you are unsure
you can check your catchment area
by using the interactive map on our
website.
A community member A Parent/Carer
A School Staff
member School Count Yes No Yes No
None of the
above
Keith
Grammar
School
Botriphnie
Primary
School
Keith
Primary
School
Newmill
Primary
school
Rothiemay
Primary
School
St Thomas
RC Primary
School
Other
(please
specify)
Crossroads Primary School 5 15 0 20 12 8 13 7 2 5 0 5 0 7 0 0
Keith Primary School 5 3 3 11 0 11 3 8 3 4 0 4 0 0 1 0
Rothiemay Primary School 3 12 4 19 7 12 16 3 0 4 0 0 0 15 0 0
TOTAL 13 30 7 50 19 31 32 18 5 13 0 9 0 22 1 0
Are you….. Please select which school/s you or your child/children attend from the list below
Do you have a primary aged
pupil or younger child directly
affected by the changes to
Crossroads Primary School in
your family?
Are you currently a pupil or
parent/carer of a pupil at a
Moray School?
APPENDIX 1 (APPENDIX E)
Page 149

Page 150

Percentage of Respondents
6 7 9
In which Primary School catchment
area do you live?If you are unsure
you can check your catchment area
by using the interactive map on our
website.
Option 1- Close Crossroads
Primary School and rezone
pupils to Keith Primary School
Option 2 – Close Crossroads
Primary School and split the
catchment between Rothiemay
Primary School and Keith
Primary School
No
preference Yes No
Option 1 – Close
Crossroads Primary School
and rezone pupils to Keith
Primary School
Option 2 – Close Crossroads Primary
School and split the catchment
between Rothiemay Primary School
and Keith Primary School
Both Option 1 and Option 2
should be discounted
Neither Option 1 or Option 2
should be discounted
Crossroads Primary School 7 7 2 9 7 3 6 5 2
Keith Primary School 2 5 2 6 3 1 1 1 6
Rothiemay Primary School 1 17 0 9 9 9 5 1 3
TOTAL 10 29 4 24 19 13 12 7 11
Which option do you prefer for the proposed school catchment area?
Do you support the
closure of
Crossroads
Primary School? Do you think any of these options should be discounted? If so, please indicate which one.
1 2 3 4 5
In which Primary School catchment
area do you live?If you are unsure
you can check your catchment area
by using the interactive map on our
website.
A community member A Parent/Carer
A School Staff
member School Count Yes No Yes No
None of the
above
Keith
Grammar
School
Botriphnie
Primary
School
Keith
Primary
School
Newmill
Primary
school
Rothiemay
Primary
School
St Thomas
RC Primary
School
Other
(please
specify)
Crossroads Primary School 25.0% 75.0% 0.0% 40.0% 60.0% 40.0% 65.0% 35.0% 10.0% 25.0% 0.0% 25.0% 0.0% 35.0% 0.0% 0.0%
Keith Primary School 45.5% 27.3% 27.3% 13.8% 0.0% 100.0% 27.3% 72.7% 27.3% 36.4% 0.0% 36.4% 0.0% 0.0% 9.1% 0.0%
Rothiemay Primary School 15.8% 63.2% 21.1% 38.0% 36.8% 63.2% 84.2% 15.8% 0.0% 21.1% 0.0% 0.0% 0.0% 78.9% 0.0% 0.0%
TOTAL 26.0% 60.0% 14.0% 100.0% 38.0% 62.0% 64.0% 36.0% 10.0% 26.0% 0.0% 18.0% 0.0% 44.0% 2.0% 0.0%
Are you…..
Do you have a primary aged
pupil or younger child directly
affected by the changes to
Crossroads Primary School in
your family?
Are you currently a pupil or
parent/carer of a pupil at a
Moray School?
Please select which school/s you or your child/children attend from the list below (Proportions based on
respondents NOT answer choices, respondents may have children attending more than one school e.g
Keth Primary & Keith Grammar)
6 7 9
In which Primary School catchment
area do you live?If you are unsure
you can check your catchment area
by using the interactive map on our
website.
Option 1- Close Crossroads
Primary School and rezone
pupils to Keith Primary School
Option 2 – Close Crossroads
Primary School and split the
catchment between Rothiemay
Primary School and Keith
Primary School
No
preference Yes No
Option 1 – Close
Crossroads Primary School
and rezone pupils to Keith
Primary School
Option 2 – Close Crossroads Primary
School and split the catchment
between Rothiemay Primary School
and Keith Primary School
Both Option 1 and Option 2
should be discounted
Neither Option 1 or Option 2
should be discounted
Crossroads Primary School 43.8% 43.8% 12.5% 56.3% 43.8% 18.8% 37.5% 31.3% 12.5%
Keith Primary School 22.2% 55.6% 22.2% 66.7% 33.3% 11.1% 11.1% 11.1% 66.7%
Rothiemay Primary School 5.6% 94.4% 0.0% 50.0% 50.0% 50.0% 27.8% 5.6% 16.7%
TOTAL 23.3% 67.4% 9.3% 55.8% 44.2% 30.2% 27.9% 16.3% 25.6%
Which option do you prefer for the proposed school catchment area?
Do you support the
closure of
Crossroads
Primary School? Do you think any of these options should be discounted? If so, please indicate which one.
Page 150

Page 151

Survey questions and responses
Question 1 - In which Primary School catchment area do you live? If you are unsure, you can check your catchment area by using the interactive map on our
website. (50 responses)
Chart 1 shows that 40% (20) of the respondents lived within the Crossroads Primary School catchment area, 38% (19) were from the Rothiemay Primary School
catchment and 22% (11) resided in the Keith Primary School catchment.
Chart 1
Page 151

Page 152

Question 2 – Are you a parent/carer, school pupil, community member, community organisation or staff member? (50 responses)
Chart 2 shows that 30 people identified as parents/carers, 13 as members of the community, and 7 as staff members
Chart 2
Chart 2a shows the breakdown of stakeholders by school catchment. The majority of stakeholders from the Crossroads catchment were parents/carers.
Page 152

Page 153

Question 3 – Do you have a primary aged pupil or younger child directly affected by the changes to Crossroads Primary School in your family? (50 responses)
Chart 3 shows the majority of people (31) do not have primary aged children or younger children affected by the changes to Crossroads Primary School. 19 people do
have a child/children affected. 
Page 153

Page 154

Question 4 – Are you currently a pupil or parent/carer of a pupil at a Moray School? (50 responses)
Page 154

Page 155

Question 5 – Please select which school/s you or your child/children attend from the list below. (46 responses)
Chart 5 shows that most of the respondents had children at  Rothiemay Primary School. 
Page 155

Page 156

Question 6 – Which option do you prefer for the proposed school catchment area? (43 responses)
As shown in Chart 6, 29 people (68%) prefer option 2 (Close Crossroads primary and distribute catchment between Rothiemay Primary School and Keith Primary
School), with 10 (23%) selecting option 1 (Close Crossroads Primary School and rezone pupils to Keith Primary School) and 4 (9%) indicating no preference. 
7 people skipped this question.
Page 156

Page 157

Chart 6a shows that among parents/carers, Option 2 was the most favoured, while Option 1 had the least support.
Page 157

Page 158

Chart 6b shows 17 out of 43 responders who preferred Option 2 (Split catchment between Rothiemay Primary and Keith Primary School) are in the Rothiemay primary
catchment.
Those in the Crossroads catchment favoured Options 1 and 2 equally, with 2 expressing no preference. Whereas only 5 people from Keith Primary catchment favoured
option 2. 
Page 158

Page 159

Question 7 – Do you support the closure of Crossroads Primary School? (43 responses)
As shown in Chart 7, 24 (56%) people are supportive of closure and 19 (44%) against the proposal. 7 people skipped this question.
Chart 7a shows that support for the proposal among parents/carers was equal.
Page 159

Page 160

Chart 7b shows that 9 out of 16 people from the Crossroads catchment are in favour of the proposed closure.
Page 160

Page 161

Question 9 – Do you think any of these options should be discounted? If so, please indicate which one(s) and give your reasons below. (43 responses)
Chart 9: As shown in Chart 9, the majority of stakeholders believe that option 1 should be discounted, while 12 people believe that option 2 should be discounted
Page 161

Page 162

Schools (Consultation) (Scotland) Act 2010
Report by Education Scotland addressing educational aspects of
the proposal by Moray Council to close Crossroads Primary School.
December 2024
APPENDIX 1 (APPENDIX F)
Page 162

Page 163

1   | Schools (Consultation) (Scotland) Act 2010 
Moray Council © Crown Copyright
1. Introduction 
1.1 This report from Education Scotland has been prepared by His Majesty’s Inspectors of
Education (HM Inspectors) in accordance with the terms of the Schools (Consultation) (Scotland)
Act 2010 (“the 2010 Act”). The purpose of the report is to provide an independent and impartial
consideration of a proposal by Moray Council to close Crossroads Primary School. Section 2 of
the report sets out brief details of the consultation process. Section 3 of the report sets out
HM Inspectors’ consideration of the educational aspects of the proposal, including significant
views expressed by consultees. Section 4 summarises HM Inspectors’ view. Upon receipt of this
report, the Act requires the council to consider it alongside any relevant considerations the council
received and then prepare its consultation report. The council’s consultation report should include
this report and must contain an explanation of how, in finalising the proposal, it has reviewed the
initial proposal, including a summary of points raised during the consultation process and the
council’s response to them. The council has to publish its consultation report at least three weeks
before it takes its final decision. With all proposals the council needs to follow all statutory
obligations set out in the 2010 Act. Where a council is proposing to close a school, there are
specific additional obligations. These include notifying Ministers within six working days of making
its final decision and explaining to consultees the opportunity they have to make representations to
Ministers. There are special provisions that apply to close a rural school. 
1.2 HM Inspectors considered:
• the likely effects of the proposal for children of the school; any other users; children likely to
become pupils within two years of the date of publication of the proposal paper; and other
children and young people in the council area;
• any other likely effects of the proposal;
• how the council intends to minimise or avoid any adverse effects that may arise from the
proposal; and
• the educational benefits the council believes will result from implementation of the proposal,
and the council’s reasons for coming to these beliefs. 
1.3 In preparing this report, HM Inspectors undertook the following activities:
• attendance at the public meeting held on 22 October 2024 in connection with the council’s
proposals; 
• consideration of all relevant documentation provided by the council in relation to the
proposal, specifically the educational benefits statement and related consultation
documents, written and oral submissions from parents and others; and
• visits to the sites of Crossroads Primary School, Keith Primary School, Rothiemay Primary
School, St Thomas RC Primary School, Keith Grammar School, including discussion with
relevant consultees, and a meeting with Strathisla Community Council. 
1.4 As the proposal, if implemented, will lead to the closure of a rural school, HM Inspectors
also took account of the council’s consideration of any reasonable alternatives to closure of
Crossroads Primary School, the likely effect on the local community and the likely effect of any
different travelling arrangements of the proposed closure.  
Page 163

Page 164

2   | Schools (Consultation) (Scotland) Act 2010 
Moray Council © Crown Copyright
2. Consultation process 
2.1 Moray Council undertook the consultation on its proposal(s) with reference to the Schools
(Consultation) (Scotland) Act 2010. 
2.2 Moray Council mothballed Crossroads Primary School in January 2023, after the school roll
had reduced to five children in August 2022. It has remained mothballed since that date. The
statutory public consultation ran from 23 September to 15 November 2024. Copies of the
consultation paper were made available to stakeholders, and at a range of local venues and on
Moray Council website. A public meeting was held on 22 October 2024, which was attended by
nine stakeholders. An online survey received 50 responses. Of those that answered the question
“do you support the closure of Crossroads Primary School?” a majority were in favour with
24 agreeing and 17 against. Of those who stated they live in the Crossroads Primary School
catchment area, nine agreed with the proposal and seven disagreed. Stakeholders raised
concerns about the proposal. These included worries that closing a rural school makes a
community less attractive for people considering moving there. A few are concerned this could
reduce opportunities for children to attend a small, local school, which they feel may suit some
children’s needs better than a larger school. Stakeholders expressed mixed views about whether
Crossroads Primary School catchment area should be zoned only to Keith Primary School or split
between Rothiemay and Keith Primary Schools. A few questioned if the catchment area should be
further divided up to include other nearby local schools. 
2.3 Groups of children at St Thomas RC, Newmill, Rothiemay and Keith Primary Schools were
consulted on the proposal. They had mixed views on whether the school should be closed. A
minority thought the school should be reopened as this would reduce travel time for children
getting to school. However, they had a range of concerns about the school reopening including
that they might miss friends they have at their existing schools. They also said that moving to
secondary school from a very small primary school might be harder.   
3. Educational aspects of proposal 
3.1 HM Inspectors broadly agree that there are education benefits to this proposal. Children
from the Crossroads Primary School catchment area are settled into other local schools and
enjoying learning alongside their peers from the wider area. Children that HM Inspectors met with
at Rothiemay, Keith and St Thomas RC Primary Schools are experiencing opportunities to build
friendships and increase their social skills. Whilst the council’s educational benefits statement lays
out a range of potential statements that HM Inspectors agree with, elsewhere in its proposal the
council states that a school roll of fewer than 15 pupils provides significant impediments to the
successful implementation of Curriculum for Excellence. HM Inspectors do not support the view
that a small school roll is, in itself, a significant impediment to the implementation of Curriculum for
Excellence. 
3.2 HM Inspectors met with children from Rothiemay, Keith and St Thomas RC Primary
Schools and young people at Keith Grammar School who live in Crossroads Primary School
catchment area. Several of these children and young people previously attended the school. The
majority agree the school should be closed, but a few thought it should reopen. This was mainly as
this would reduce their travel time to school. Most recognise that different sized schools suit
different children and therefore feel it is important that families have the choice to send children to
Rothiemay or Keith Primary Schools. The young people at Keith Grammar School that
HM Inspectors spoke with, value the whole school and community approach they experienced at
Crossroads Primary School. However, they also value the opportunities for friendship and shared
learning they experienced when they moved to a larger school. 
Page 164

Page 165

3   | Schools (Consultation) (Scotland) Act 2010 
Moray Council © Crown Copyright
3.3 If the proposal is agreed, most stakeholders that HM Inspectors spoke with support splitting
the Crossroads catchment area between Keith and Rothiemay Primary Schools. Stakeholders at
Rothiemay Primary School think it is important that their school roll is supported by part of the
catchment area being zoned to their school. For several stakeholders, access to school transport
is an important consideration in regard to how Crossroads Primary School catchment area may be
divided up. Several stakeholders spoke about children being able to attend their nearest school
and all felt parent choice is an important factor.   
3.4 As the proposal will lead to the closure of a rural school, HM Inspectors also considered the
factors to which the council should give special regard. Moray Council have explored alternatives
to closure with stakeholders. At the time the school was mothballed, most parents had already
elected to move their children to other schools. During engagement by the council with parents
prior to the formal consultation, most had indicated they would not choose to send children to
Crossroads Primary School if it reopened. There are several other small, rural schools across the
wider area whose rolls could be affected to a small extent if Crossroads were to reopen. Children
in the area now have journeys to school that are longer. However, for most, travel times have
increased by only around 10-15 minutes. Stakeholders report that travel disruption in winter is
mainly due to challenging conditions on local roads. Reopening the school or choosing between
the different catchment options is unlikely to greatly affect supporting children to attend school.   
3.5 Community members who spoke to HM Inspectors felt that it is sad that a school with such
a long history may close. However, they consider that this is probably the best option given the
small number of families who have indicated interest in sending their child to the school were it to
reopen. They also understand that the council must make best use of their resources. All
stakeholders, including those who live near the school, who met with HM Inspectors think it is
important that the school site and buildings are not allowed to deteriorate further. As there is a
community hall fairly near the school, most felt the site should be made available for housing or
businesses. Several children who spoke with HM Inspectors would like some of the school
playground to be turned into a playpark. All wanted to ensure any equipment or resources left at
the site are distributed to local schools or other community facilities so they could be used. 
3.6 HM Inspectors spoke with the church representatives of Moray. A few children from the
Crossroads Primary School catchment area attend St Thomas RC Primary School. The
representatives do not perceive any issues with the proposal in regard to denominational
education.     
4. Summary 
Overall, HM Inspectors consider that Moray Council have made a reasonable case to permanently
close Crossroads Primary School. Children are settled in the schools they now attend and most
families had elected to send their children to other schools prior to the temporary closure. Most
stakeholders who spoke with HM Inspectors support splitting the Crossroads Primary School
catchment area between Rothiemay and Keith Primary Schools if the closure is agreed. If the
proposal goes ahead, the community are concerned that the school site should not be left to
deteriorate but quickly be made available for another use such as housing. 
HM Inspectors
December 2024
Page 165

Page 166

APPENDIX 2 
INTEGRATED IMPACT ASSESSMENT COVERING 
• EQUALITIES & SOCIO ECONOMIC DUTIES
• HUMAN RIGHTS AND RIGHTS OF THE CHILD 
DATE UPDATES/EXECUTIVE SUMMARY VERSION DETAILS
28 Mar 2025 Final draft following Statutory Consultation V1.0   
STAGE 1 - DO I NEED AN INTEGRATED IMPACT ASSESSMENT?   
Name of policy or proposal: Proposal to close Crossroads Primary School and rezone
catchment between Rothiemay and Keith primary schools 
Is this a  Mark X  below
New activity, programme or policy? X
Change to an existing activity, programme or policy? 
Budget proposal?   
Duties: tick the boxes you think apply No Maybe                                                                                                                                             Yes
Equalities: Will your proposal have an impact on groups with
protected characteristics? 
Consider the impact of your proposal on people and how they
access your services and information without barriers. 
X 
Socio-economic 
Not every person/family has access to regular income or savings.
Will your proposal have an adverse impact on them
X  
Does your proposal impact on the human rights of people?  X  
Does your proposal impact on the rights of children and young
people 
X
Page 166

Page 167

APPENDIX 2
SPFINANCE-565096732-34   01/05/2025 09:48 
Reasoning
The proposal to close Crossroads Primary School will impact those children (4) who live in
catchment who have been temporarily rezoned and have attended Rothiemay since the
Council agreed to mothball the school in February 2023 due to the very low school roll for
education reasons together with children (13) who live in catchment but currently attend a
school other than Crossroads Primary School as a result of parental choice and successful
placing request past applications.     
If you have answered “maybe” or “yes” to any of the Stage 1 questions above then
proceed to complete the Stage 2 Integrated Impact Assessment questions below. 
If you have answered “no” to the Stage 1 questions above then provide the details below
and submit to [email] 
Lead Officer for developing the contract  Andy Hall
Other people involved in the screening (this
may be council staff, partners 
or others i.e. contractor or community) 
Education staff (Educational Benefit
Statement drafted) 
Staff and pupil engagement and consultation
Community engagement and consultation
Date 28 Mar 2025 
Page 167

Page 168

APPENDIX 2
SPFINANCE-565096732-34   01/05/2025 09:48 
STAGE 2: INTEGRATED IMPACT ASSESSMENT 
Brief description of the affected service
1. Describe what the service does: 
Crossroads Primary School – Rural primary school within the wider Keith Grammar
Associated Schools Group
School has been mothballed since Jan 2023 and pupils temporarily rezone to Rothiemay
Primary School (with transport provided) 
2. Who are your main stakeholders? 
Primary school children currently rezoned to Rothiemay PS (4) 
Children in the Crossroads PS catchment who attend other schools within the Keith
Associated School Group - with the majority (13) attending Keith PS. 
3. What changes as a result of the proposals? Is the service reduced or removed? 
Closure of Crossroads Primary School and rezone catchment between Rothiemay and
Keith primary schools 
Education Benefit statement within consultation reports highlights how this enhances the
learning experience and opportunities of children within the Crossroads catchment 
Children who currently attend Keith Primary School would be entitled to free school
transport 
4. How will this affect your customers? 
Positive Impacts: 
Education benefit statement argues that it will improve the experience of the young
learners 
This proposal would provide improved opportunities for children to develop skills for
learning, increase opportunities for working with others of a similar age and stage, which
can be limited in schools of less than 15 children in a multi-composite setting. This is
impact is expanded upon with the education benefit section of both the consultation
proposal and final report. 
Page 168

Page 169

APPENDIX 2
SPFINANCE-565096732-34   01/05/2025 09:48
The children currently on the Crossroads school roll who are temporarily rezoned to
Rothiemay PS catchment area who will be able to continue to participate in a wider range
of learning and social opportunities at a school with a larger pupil roll. 
Children in Crossroads PS catchment currently attending Keith PS would now be eligible
for free transport to school. 
Negative impact: 
Under the current arrangements pupils from the Crossroads school roll who have been
temporarily re-zoned to Rothiemay Primary School since Feb 2023 experience an
extended travel time by bus to and from the school of between 10-15 minutes but less
than 30 minutes total under normal road conditions which is viewed as acceptable for
primary school pupils in Moray. With the proposed closure and permanent rezoning this
will be the future situation for all children currently in the Crossroads Primary School
catchment who will now travel to either Rothiemay or Keith primary schools 
5. Impact on staff providing the service 
All staff were relocated/reassigned when the school was mothballed in Jan 2023. There
would be further impact if the decision is taken to close the school 
6. Please indicate if these apply to any of the protected characteristics
Protected groups Potential impacts and considerations
Race  
Disability  
Carers (for elderly, disabled or
minors) 
Sex 
Pregnancy and maternity (including
breastfeeding) 
Sexual orientation 
Age (include children, young people,
midlife and older people)
This proposal would provide improved opportunities
for children to develop skills for learning, increase
opportunities for working with others of a similar
age and stage, which can be limited in schools of
less than 15 children in a multi-composite setting.
Religion, and or belief 
Gender reassignment 
Inequalities arising from socio-
economic differences 
Human rights
Page 169

Page 170

APPENDIX 2
SPFINANCE-565096732-34   01/05/2025 09:48
List of convention rights Describe, where applicable, if and how
specific rights are engaged  
Article 5: Right to liberty and
security
N/A
Article 6: Right to a fair trial N/A
Article 8: Right to respect for private
and family life, correspondence and
the home
N/A
Article 10: Freedom of expression Statutory consultation under the 2010 Schools
Consultation Act provides the opportunity for
ALL stakeholders to express their opinions and
thoughts on the proposal to close Crossroads PS
Article 11: Freedom of assembly
and association
N/A
Article 12: Right to marry N/A
Article 14: Prohibition of
discrimination (in relation to the
convention rights)
N/A
Article 1 of Protocol 1: Protection of
property
N/A
Article 2 of Protocol 1: Right to
education
Rights will not be impacted
Article 3 of Protocol 1: Right to free
elections by secret ballot
N/A 
Children’s Rights and Wellbeing 
Relevant articles – UNCRC 
Article 2 – Non discrimination Not impacted – statement in the
Consultation report
Article 3.1 - Best interests of the child Educational benefit statement forms key
evidence for the closure proposal. Shared
as part of the statutory consultation
process. 
There is a prospect to improve access to
the curriculum, information, environment
and opportunities, which will ensure that
children are included, engaged and
involved in their education in order to reach
their full potential. 
Page 170

Page 171

APPENDIX 2
SPFINANCE-565096732-34   01/05/2025 09:48
It is not good practice to mothball a school
for a prolonged period of time as
Crossroads Primary School has been
mothballed since January 2023. 
It has been recognised that the proposal
has the potential to bring significant
education and social benefits to the
children living in the Clatt catchment
area. The report from Education
Scotland inspectors agrees with the
Council's educational benefits statement
and are confident there is sufficient merit
to consider the permanent closure of
Crossroads Primary School.
Article 12 – Respect of the views of the
child 
During the statutory consultation period,
the views of children and young people
affected by the proposal were sought.
Engagement with pupils at Rothiemay PS,
Keith PS, Newmill PS and St Thomas RC PS
was facilitated by Head and Class
teachers. The issues and concerns raised
by the children have been fully
considered and addressed as part of the
consultation process. 
Article 29 - Goals of education
(A child or young person’s education
should help their mind, body and talents be
the best they can. It should also build their
respect for other people and the world
around them) 
The proposal will improve access to the
curriculum, information, environment and
opportunities, which will ensure that
children are included, engaged and
involved in their education in order to reach
their full potential as learners and young
citizens. 
Article 31 - Leisure, play and culture
(affirms the right of every child to rest,
leisure, play and participation in cultural
and artistic life)
The closure of Crossroads PS and the
subsequent rezoning to other schools with
a larger school roll will provide greater
access to social and cultural opportunities
Article 42 - Knowledge of rights 
7. Evidence. What information have you used to make your assessment? 
Performance data 
Internal
consultation
Recognition that effective learning requires interaction between
pupils in different age groups. Crossroads Primary School has
Page 171

Page 172

APPENDIX 2
SPFINANCE-565096732-34   01/05/2025 09:48
been mothballed since January 2023, this prolonged
period can cause uncertainty for families and the
community. 
The longer-term opportunity to provide more effective learning
experiences for children and to close an under occupied school
building with very low school roll. 
Improved access to curriculum, information, environment and
opportunities to ensure that children are included, engaged and
involved in education and gain a more equitable educational
experience as their peers in other schools with higher more
viable school rolls 
Cross service desk top options appraisal undertaken on future of
Crossroads PS following mothballing in Jan 2023. Output informed
statutory Consultation proposal approved by ECLS Committee
Consultation with
affected groups
Full consultation in accordance with Schools (Consultation)
(Scotland) Act 2010 (as amended). That not enough children in the
Crossroads catchment area for the school to be viable to
reopen. The evidence means: 
All comments received have been fully considered and
addressed in the final consultation report. 
The survey set up during the statutory consultation process
received feedback from 50 stakeholders  
Local statistics The annual Moray school roll forecast data has been an indicating
a falling school roll for Crossroads Primary School over the last 3
years with the main contributor to this parental choice and the
significant number of placing requests to other primary schools in
the Keith ASG catchment.  
Falling birth rate across Moray, especially in rural areas, and an
aging rural population indicates that there is no realistic
expectation that the low school roll will change in the foreseeable
future
National statistics Scotland's Learning Estates Strategy – Connecting People,
Places and Learning recognises the importance of the learning
estate in supporting outcomes that are necessary for a
successful Scotland. The vision is for a learning estate which
supports excellence and equity for all. The strategy details the
specific national outcomes to which it primarily relates (a) we
grow up loved, safe and respected so that we realise our full
Page 172

Page 173

APPENDIX 2
SPFINANCE-565096732-34   01/05/2025 09:48
potential (b) we are well educated, skilled and able to contribute
to society.   
8. Evidence gaps 
Do you need additional information in order to complete the information in the previous
questions? 
NO – All information gathered during stakeholder engagement (post-mothballing), internal
options appraisal and during statutory consultation process and events (either verbal or via
survey) 
9. Mitigating action 
Can the impact of the proposed policy/activity be mitigated?
YES 
The closure of Crossroads Primary School and rezoning of catchment to Rothiemay and
Keith primary school will enhance the learning experience and opportunity for children,
remove the uncertainty over future primary school deliver to children in the Crossroads
catchment, and provide potential economic benefit by ensure that all children will have
access and entitlement to free school transport. 
Parents/guardians, children, staff and the wider community had opportunities to participate
in the consultation which ensured that their views are respected and included. 
It has been recognised that the proposal has the potential to bring significant education
and social benefits to the children living in the Clatt catchment area. The report from
Education Scotland inspectors agrees with the Council's educational benefits statement
and are confident there is sufficient merit to consider the permanent closure of Clatt
School. 
10. Justification
If nothing can be done to reduce the negative impact(s) but the proposed policy/activity must
go ahead, what justification is there to continue with the change?   
No negative impacts assumed or noted that are not mitigated in the proposal 
Page 173

Page 174

APPENDIX 2
SPFINANCE-565096732-34   01/05/2025 09:48
SECTION 3 CONCLUDING THE IIA 
Concluding the IIA 
1. No potential negative impacts on any of the protected groups were
found.
NO
2. Some potential negative impacts have been identified.
The impacts relate to: The children currently on the Crossroads school
roll will find travel time by bus to and from school will be extended on
average by between 10-15 minutes (although this has been the case since
Feb 2023)
YES 
Reducing discrimination, harassment, victimisation or other conduct
prohibited under the Equality Act 2010
NO
Promoting equality of opportunity YES
Fostering good relations 
3. The proposals interfere with human rights and/or the rights of the child NO
4. Negative impacts can be mitigated the proposals as outlined in
question 9.
YES
5. The negative impacts cannot be fully mitigated but are justified as
outlined in question 10. 
NO
6. Further consultation with affected groups is needed. NO
7. It is advised not to go ahead with the proposals. NO 
Decision 
A Report recommending closure of Crossroads PS will be submitted to Education, Children’s
and Leisure Services Committee on 13 May 2025. Should the closure recommendation be
agreed it would need to go to full Council meeting on 21 May 2025 for final approval. 
The Schools Consultation Act 2010 states that If the Authority makes a final decision to
implement a closure proposal, it will require to notify Scottish Ministers of that decision and
Page 174

Page 175

APPENDIX 2
SPFINANCE-565096732-34   01/05/2025 09:48
provide them with a copy of the proposal document and consultation report.  This must be
done within six working days of the decision.  Scottish Ministers have an eight-week period
from the date of the final decision to decide if they will call-in the proposal. 
Within the first three weeks of that eight-week period, Scottish Ministers will take account of
any relevant representations made to them.  Until the outcome of the eight-week call-in
process is known, the Authority cannot proceed to implement the proposal. 
If Scottish Ministers call-in the proposal, they must refer the proposal to the Convener of the
School Closure Review Panels who may refuse to consent to the proposal or grant their
consent to the proposal subject to conditions or unconditionally. 
Anyone wishing to make representation to Scottish Ministers during the three week period
referred to above should do so by email to schoolclosure@gov.scot or in writing to The
Scottish Government, School Infrastructure Unit 
Date of Decision: earliest date of final decision would be 8 weeks after the 21 May 25 
Page 175

Page 176

APPENDIX 2
SPFINANCE-565096732-34 01/05/2025 09:48
Sign off and authorisation:
Service Education Resources and Communities
Department  Learning Estate
Policy/activity subject to IIA Proposed closure of primary school
We have completed the integrated impact
assessment for this policy/activity. 
Name: Andy Hall
Position: Programme Manager (Learning Estate)
Date: 21 April 2025
Authorisation by head of service Name: Denise Whitworth
Position: Depute Chief Executive (Education,
Communities & Organisational Development)
Date:21 April 2025
Permission to publish on website - YES
Please return this form to the Equal Opportunities Officer, Chief Executive’s Office.
Page 176

Page 177

Report to: Education, Children’s
and Leisure Services
Committee 
Meeting Date: 13 May 2025  
Report by: Depute Chief Executive
(Education,
Communities and
Organisational
Development) 
Report No:  EDU028/25/AH  
Author: Andrew Hall Contact Email: Learningestate@moray.gov.uk 
Subject: Future Buckie High School Project Update 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to note the affordability issues related to the current Future
Buckie High School project and consider options to progress the project.  
1.2  This report is submitted to the Committee in terms of Section III (D) (17) of the Council’s
Scheme of Administration relating to the School Estate to consider and make
recommendations on capital and minor works programmes within the remit of the
Committee. 
2.  SUMMARY  
2.1  This report provides an update on the Future Buckie High School project, addressing
affordability issues and outlining potential options for progress. 
2.2  It outlines that the current Buckie High School faces significant building condition issues,
acknowledged by various stakeholders over recent years and details that substantial
investment is necessary to deliver a sustainable secondary school. A mandate for the
Future Buckie HS project was approved in January 2022.  In approving the mandate a
potential risk was highlighted that there might be future financial challenges that could see
significant project phasing, delay or cancellation. 
2.3  In light of the recent significant reduction in capital budget allocated to the Learning Estate
Programme over the next 3 years and the expected longer term future budget constraints on
Item 11.*
Page 177

Page 178

the programme, affordability is now a significant issue for the Future Buckie High School
project.  This report emphasises the need for strategic planning and decision-making
regarding the Future Buckie High School project and the necessity of aligning with broader
schools infrastructure goals going forward. It recommends several actions that relate to
affordability status, investment scheduling decisions, cross project funding review and
utilisation and future community engagement.   
3.  RECOMMENDATIONS  
3.1  It is recommended that Committee:   
i)  Note the current Learning Estate programme affordability status in relation to
Buckie High School; 
ii)  Agree to schedule any decision on any future investment in the Buckie High
School project to follow a decision on the future of the Elgin High School
Capacity Expansion project;   
iii)  Agree to schedule consideration of significant investment beyond immediate
repair and maintenance requirements to the current Buckie High School
buildings to after there is clarity on the future investment in the Learning
Estate Improvement Programme, or its successor programme, by Scottish
Government;   
iv)  Instruct the Learning Estate team to continue to progress work on the options
for delivery of an affordable project utilising BB capital upgrade funding and to
extend external consultancy support to ensure a quick turnaround of a
phased/prioritised risk assessed programme to take advantage of any
emerging funding; 
v)  Note that a meeting with the Buckie Community will be planned to discuss the
status of the Future Buckie HS project; and, 
vi)  Note that an update report will be brought to Committee in November 2025.  
Andy Hall
Programme Manager (Learning Estate) 
4.  BACKGROUND AND CONTEXT 
4.1  With a combination of core condition and suitability issues, together with potential future
school roll capacity challenges due to the housing development, predominantly to the west
and south of the town, Buckie High School (HS) has been previously acknowledged by
Corporate Management Team (CMT), Elected Members, Staff and Parent Forums as not able
provide a long-term sustainable solution to provide resilience in the secondary education
provision in the Buckie Associated School Group (ASG) without significant investment. 
4.2  A Future Buckie HS project mandate was approved by CMT in January 2022. However, in
giving its approval, the CMT noted that “given the prevailing financial position of the council,
Page 178

Page 179

the estimated financial figures in the mandates (Future Buckie HS and Future Forres
Academy) gave rise to a question of affordability which could result in, for example the
projects being phased or indeed being aborted and retained as “shovel ready” should the
financial circumstances of the Council ease”.  It was noted there would be various points at
which consideration could be given as to whether the project would proceed.   
4.3  At a meeting of Moray Council on 28 September 2022 (para 26 of minute refers) it was
agreed to submit bids for two projects for Scottish Government (SG) Learning Estate
Investment Programme (LEIP) Phase 3 funding – Future Forres Academy and Future Buckie
HS. The LEIP3 bids were submitted to SG in October 2022 with no priority project.  Following
a request by Scottish Futures Trust, it was agreed at a meeting of Moray Council on 7
November 2022 (para 3 of minute refers) that Future Forres Academy would be the Moray
‘priority’ project due to the recently discovered Reinforced Autoclaved Aerated Concrete
(RAAC) and its overall D (Bad) building condition. Only the Forres Academy was successful
in its LEIP 3 bid. 
4.4  The same 7 November 2022 Council meeting agreed that due to the current and forecast
deteriorating condition of the current Buckie HS, the Learning Estate Programme would
continue to progress the Future Buckie HS project as an investment priority and the
indicative 2023/24 10-year capital plan identified a budget of £87.5m based on an
operational delivery date of late 2029. 
4.5  It should be noted that the 3 new secondary schools delivered over the past 15 years in
Moray have required significant supporting investment from SG in the form of public private
finance initiatives or matched capital investment and in the case of Future Forres Academy
new build  outcome-based revenue funding.   
4.6  At the meeting of this Committee (ECLS) on 19 September 2023 (para 16 of minute refers), it
was agreed to engage hub North Scotland Limited (HNSL), who assisted in the development
of the LEIP3 bids for Moray, to undertake a project feasibility/project definition for Future
Buckie High School. The feasibility study identified that the location for the future school
and community hub would be within the site boundary of the existing school and reviewed
several options of how to improve Buckie High School: Do Nothing, Major Refurbish and
Reuse, New Build and a hybrid of these, with the detail on each option summarised below: 
Do Nothing
This option is included because it is a comparator requirement within the Treasury Green
Book guidance for the appraisal of programmes and projects. The option was discounted as
the current school buildings are assessed (Dec 2022) as overall condition C i.e. showing
major defect and/or not operating adequately.  The current school was designed for an
earlier approach to educational provision and no longer reflects the needs of the community
for the integration of education, skills and jobs to support long-term resilience and
sustainability. There is an increasing risk of reactive maintenance spend on the building and
a rising sum of investment required to make much needed fabric improvements. Significant
funds have already been spent over the last 5 years and this has only maintained the low
condition and not prevented further deterioration.  The continued drain on resources simply
to maintain the current Buckie High School at low condition and suitability standards is
neither sustainable nor financially responsible. 
Major Refurbishment and Reuse
Page 179

Page 180

Several criteria were considered when reviewing refurbishment and reuse options, including
the existing condition and any design and construction challenges that a refurbishment
scenario may present.  Two key issues present significant if not insurmountable challenges:
the existing span between the structural floor slabs (which is significantly less than in
modern education facilities) would pose a challenge with the mechanical ventilation
required to meet current energy targets; and the probable requirements to insulate under
the existing ground floor slab.  However, there are a number of different buildings which
make up Buckie HS and the co-located swimming pool and fitness centre and the
aforementioned issues would not present as significant a challenge in all of the buildings. 
While a full refurbishment of the entire Buckie HS campus may not be feasible or
economically viable, certain areas or buildings could be refurbished and reused and reduce
the requirement for total new build, providing some cost savings against a full new build
option 
New Build 
Whilst it is recognised that there are sustainability and embodied carbon benefits to the
refurbishment and reuse of buildings, benchmark data indicates that the construction cost
to refurbish a school is generally around 90% of the cost of a new build.  However, the
refurbishment costs are likely to be higher in this instance due to a number of issues
including thermal performance of the external envelope, concerns of fire engineering and
the likely requirement of temporary decant accommodation while refurbishing existing
buildings.  A new build solution could offer efficiencies in design, better operational
functionality and education and wayfinding benefits as well as significantly lower
operational carbon emission 
Hybrid – Refurbishment and New Build 
The hybrid approach of reusing existing buildings together with new build element was
viewed as a sustainable and cost-effective solution although more detailed building
investigation would be required to concur with limited building survey assessment
undertaken as part of the feasibility study.   
4.7  High level detail of each of these options, including a strategic options appraisal and
estimated costs is at in Appendix 1. 
4.8  Although the indicative 10 year capital plan for 2024 to 2034, which included in its baseline
the £89,250,000 assigned to the Future Buckie HS within the Learning Estate programme
budget, was approved by Council on 24 January 2024 (para 11 of minute refers) discussions
with Finance on affordability risk prompted the appointment of HNSL in April 2024 to
undertake a further feasibility study on alternate affordable options for a future Bucke HS,
referred to as the ‘Do Minimum’ options, that focused on: 
• Low B Condition Upgrade – Major building elements from core facts (Roof, Windows,
Doors, External Walls, Heating and Power) upgraded to meet minimum overall B
standard
• High B Condition Upgrade– All core condition building elements upgrade to meet A or
B standard 
These proposed feasibility options would make no significant changes to the overall design
of the current school buildings that was a key feature of the earlier feasibility study. 
Page 180

Page 181

4.9  This new feasibility approach considered only re-use and identified specific discrete areas
of the school site that could provide an opportunity for a phased approach to upgrade works
that would reduce the requirement for any significant school decants into other areas of the
school or into temporary modular accommodation. These areas are (with Gross Internal
Floor Area): 
A. Old School Building (2748m2)
B. Canteen, SEN/ASN Kitchen and Dining (760m2)
C. Technical Wing – CDT (1118m2)
D. Swimming Pool and Leisure Centre (1243m2)
E. H Block/Tower Block (4730m2)
F. Music and Highfield Hall (1022m2)
G. Main Entrance, Admin Office, Community and Social Area (757 m2)
H. PE and Games (1463 m2)
I. Link buildings (652m2) 
A plan view showing these specific building areas is at Appendix 2.   
4.10  The ‘Do Minimum’ feasibility study in August 2024 highlighted a key factor influencing the
overall cost of the ‘Do Minimum’ option was the April 2024 amendment to Building Technical
Standards that set out significant changes to building energy requirements that would
require the a changeover from direct emissions heating systems (fossil) to non-direct (fossil
free) and that would require significant fabric upgrade and major new heat system ducting. 
4.11  The ‘Do Minimum’ project cost has been estimated at £67,161,100 (excluding Authority
costs) and assumes a 72- month programme of works and a requirement for phased school
decants (within existing accommodation and temporary modular for practical and catering). 
4.12  Continued discussions on the affordability of 10 year capital plan in late 2024 gave rise to
further concern over the scale of the potential budget reductions that the Learning Estate
programme would have to make and specifically the Buckie HS project. HNSL were
instructed in December 2024 to identify opportunities within the ‘Do Minimum’ option to
further reduce project costs. 
4.13  The focus of this most recent study was to optimise the value of the project budget through
consolidation of the existing school accommodation into a smaller footprint thereby
allowing investment to be focused only on those buildings where it would deliver the best
outcome. This allowed an appraisal of existing accommodation along with the development
of proposed localised internal configuration and alteration works to facilitate this
consolidation. The study key findings were that the gross internal floor area of the school
could be reduced with the consolidation of the school functions into fewer buildings.     
4.14  The study also noted that while the existing Community Swimming Pool and Sports Building
would be retained as part of the site proposal it was recommended it be excluded from the
scope of the works and the costs for the school. The standalone cost to upgrade this
building is estimated to be £10m. 
4.15  A high level comparison between the ‘Do Minimum’ options and earlier proposals is set out
in the Table below. 
Page 181

Page 182

Do Minimum  - Reduced GIFA
(December 2024)
Do Minimum (August
2024)
Newbuild Proposal (based
on Option 3a April 2024 –
Standalone newbuild and
minimal refurbishment of
swimming pool and fitness,
old building retained as wind
& watertight)
GIFA 9,909m2 14,493m2 15,001m2
Construction Costs £48,612,900 £67,161,00 £95,162,100
Authority Costs £2,422,900 £3,167,700 £4,063,600
TOTAL COSTS £51,035,800 £70,324,800 £99,225,400
Key Features
Sustainability/Energy
targets
Compliance with technical
standards only
Compliance with
technical standards only
Newbuild element achieving
LEIP standards of
compliance
Decant
Significant decant requires
multiphase approach – 56
months
Significant decant
requires multiphase
approach – 72 months
Newbuild facilitates shorter
programme – 49 months
Phasing Strategy Yes – with some decant Yes – with some decant
Newbuild can be undertaken
with existing school in
operation
Disruption Noise and dust impacting on
existing school experience
Noise and dust impacting
on existing school
experience
Newbuild self-contained and
significantly reduced impact
on school operations   
4.16  In August 2024, a Strawman paper was discussed at the Asset Management Working group
that reviewed the distinction between programmes of work and individual projects and
proposed the concept of Named and Core projects to distinguish between new asset
projects with discrete non-recurring spend (Named) and asset management recurring
projects (Core).  At this stage, only the Future Forres Academy and Elgin High School
Capacity Expansion projects were considered Named projects as capital spend for these
projects was committed, whereas the Future Buckie HS project was considered a Core
project as budget was only planned. 
4.17  The consequence was that when in late 2024, in seeking to apply a threshold cap on future
capital borrowing, Named projects were identified as either priority or non-priority, with non-
priority removed from the 3 year capital plan.  The remaining required cap on capital spend
was then allocated pro rata against all Core project planned expenditure. In December 2024
it was proposed that £66m would be removed from the 10 year Learning Estate Programme
capital plan. This still maintained a planning budget of around £40m for the Future Buckie
Page 182

Page 183

HS project and flexibility on other capital works to further contribute to the overall project
budget following an options appraisal for the project.         
4.18  In January 2025 the Learning Estate programme had a further reduction of £32.4m applied to
its capital budget over the next 3 financial years and this was approved at Council meeting
on 21 January 2025 (para 7 of Minute refers) which significantly reduced the planned funding
for any of the options then under consideration for the Future Buckie HS project and it this
affordability issue that was reported to this Committee on 18 February 2025 (para 14 of
Minute refers).   
4.19  The table below sets out the that the reduced capital budget currently commits funding to
the Named Future Forres Academy and Elgin High School capacity expansion projects, a
budget of just under £8m has been committed next financial year to several priority
condition/suitability primary school upgrade projects and a small budget to support some
further feasibility and concept design work at Buckie HS.  Although there is a plan to further
invest in the BB upgrade programme and further design work for the Future Buckie HS
project, together with potential requirements to further support primary capacity expansion
in Elgin (cost effective alternatives to the new build projects planned within the Findrassie
and Glassgreen residential housing masterplans and previous 10 year capital plans) there is
currently insufficient capital funding to do so with a shortfall of just over £5m in financial
year 2026/27 and £19m in financial year 2027/28.   
4.20 
4.21  The November 2024 school census and associated school roll forecast indicated that the
secondary school capacity requirement to be met by Elgin HS was significantly lower than
had been forecast over the last 14 years. To allow an independent review of the school roll
forecast by an external consultancy and reassert the requirement for a new building this
Committee on 26 November 2024 (para 26 of minute refers) approved up to a 12 month
delay to the current Elgin High School Capacity Expansion project. 
5.  PROPOSALS  
5.1  A Do Nothing option is not considered viable given the need to address significant fabric
and component risks and issues impacting the sustainability of Buckie HS over the short to
medium term; however all other options need to be affordable and should deliver a
sustainable long term future school design solution. 
Page 183

Page 184

5.2  This  section highlights actions considered that could support the delivery an affordable
and sustainable Future Buckie HS project. Other actions may be identified over future
months in considering alternate design and funding scenarios. 
Action 1: Reduce costs of all Named capital projects   
5.3  This option would look to reduce Elgin HS capacity extension and future Forres Academy
projects which are currently costed against a Gross Internal Floor Area (GIFA) metric to
meet the forecast school capacities and current space minimums (e.g. 60m2 classrooms
for 30 pupils). The projects are already investigating options to reduce the GIFA with each
m2 area reduction resulting in @£7k cost saving for a LEIP 3 project. 
5.4  In terms of the Future Buckie HS project, as a minimum, it is assumed that any new
build/refurbishment will not increase the current school GIFA and there may even be an
opportunity to reduce this. This Action could also consider not replacing or refurbishing the
sports building and swimming pool. 
5.5  This Action alone is unlikely to deliver the level of savings to achieve the affordability
objective but could contribute several million to a reduced Future Buckie HS requirement.   
Action 2A: Buckie HS Do Minimum – Identified priority component and fabric
improvements to achieve and maintain overall B condition (Existing GIFA) 
5.6  The current Do Minimum approach addresses all aspects of school fabric and condition
that are categorised as C or D together with those category B areas that are at risk of
deteriorating from a B to C standard. This Action will see a reduction in the works packages
to meet an overall B upgrade by only addressing higher weighted building components
(roofs, windows, walls, mechanical and electrical) and other priority components (at
greatest risk of failure) in a longer phased delivery approach. 
5.7  As highlighted earlier the “Do Minimum” approach would likely require significant works to
meet the 2024 Building Technical Standards in terms of switching from fossil to non-fossil
fuel heating solution. 
5.8  The Do Minimum design would not see any new build or significant redesign of the internal
space except where the internal works to meet technical standards would support a layout
redesign. 
5.9  A Do Minimum design and construction project is estimated to take a minimum of 72
months to deliver and would require periods of decant within the current school and likely
temporary modular buildings. 
Action 2B: Do Minimum – Identified priority component and fabric improvements to
achieve and maintain overall B condition (Reduced GIFA) 
5.10  This Action is similar to Option 2A but with the difference that a smaller number of buildings
would be retained thereby further reducing the GIFA and costs. The design and construction
process would focus on relocating the enhanced ASN unit and kitchen/catering to the main
H Block/Tower Block, reduce the Technical Wing areas and exclude the school gym/PE area
and community swimming pool and leisure centre from the main project plans and costs.
Page 184

Page 185

5.11  An external consultancy project is reviewing the existing building/room layouts against the
current and anticipated future timetable requirement for teaching and other spaces to
determine if a reduction in the overall GIFA can be justified from an educational
perspective. 
5.12  This project approach would seek to reduce the GIFA from 14,493m2 to 9,909m2. The option
still assumes that design would need to meet 2024 building technical standards and
construction would take an estimated 156 weeks (39 months) to complete with some
expected requirement for decant.   
Action 3A: Reduce or Cancel the Elgin HS Capacity Extension Project (Lose LEIP 2
funding) 
5.13  The current Elgin HS capacity extension project is based on school roll forecast information
that over several years has factored an increase in pupil number due to significant planned
residential house building in south Elgin (Linkwood and Glassgreen developments). A
review of the November 2024 school census data, together with analysis of updated
housing build out rates and annual birth rate data,  indicates that the forecast secondary
school capacity  is significantly lower than that forecast over the last 3 years and it may not
see it exceed much above a maximum of 900 pupils over the next 8 years against a current
planning capacity of 829 (augmented by 2 temporary modular classroom units that provide
an additional 60 classroom spaces).     
5.14  This Action would see the planned new build Annex either significantly reduce in size or be
cancelled and most of the committed capital funding (£18.6m) could be reallocated to the
Future Buckie HS project. A smaller budget (estimated £1m - £750m) would be retained to
allow internal space optimisation works in Elgin HS to take account of a smaller school
population increase over the next 8 years. 
5.15  The Elgin HS capacity expansion project is part of SG LEIP Phase 2 programme and
therefore up to 50% of the construction budget (up to £8.3m) which would be available from
SG under the 25 year outcome-based revenue funding model would be lost to future
Council revenue. As a result of this Action this funding would be lost. 
Action 3B: Reduce or Cancel the Elgin HS Capacity Extension Project (Transfer LEIP 2
funding) 
5.16  This option is the same as Option 3A but would seek approval from SG to re-assign the LEIP
2 funding to the Future Buckie HS project. 
5.17  LEIP 2 funding is dependent on meeting several key funding criteria – significantly for the
Future Buckie HS project this would be the requirement to meet energy efficiency and
building condition objective and therefore any re-assignment would need to be against a
specific school building project e.g. Old School Building or PE/Games building and it would
need to demonstrate the design would meet key objectives of the LEIP2 funding criteria. The
maximum LEIP funding available would also not exceed that agreed by SG for the Elgin HS
project (£8.3m)     
Page 185

Page 186

5.18  Initial informal dialogue with Scottish Futures Trust (who manage the LEIP funding model
and projects on behalf of SG) and officers within the SG Learning Directorate on a scenario
where the council might seek to re-assign our LEIP 2 project from Elgin HS to another
project has taken place. In principle they would consider a business case to do this
provided that the project would meet both the LEIP 2 building design and project delivery
time requirements.  Moray is familiar with this process having previously reassigned LEIP 2
status from the delayed Findrassie PS project to the Elgin HS project. 
Action 4: Reassign planned BB upgrade funding to future Buckie HS project for next 5-8
years 
5.19  The current Learning Estate Programme budget is committed for the next 12 months to
several BB condition/suitability school projects. There are Phase 2 elements to most of
these projects that would require further funding in future years to complete but this is
planned rather than committed works.  The table earlier, setting out the 3 year capital plan
for the Learning Estate, indicated there is limited if any budget available for BB works for
financial years 2026/27 and 2027/28 but for follow on years between £7m-£10m per year is
expected to be made available for the next 15 years.  Should this funding be re-profiled to
Buckie HS as a single improvement project it could provide significant capital funding to
support the selected new build, refurbishment, reuse or hybrid future school option,
although there is currently no funding committed as yet to be reprofiled. 
5.20  This option would be to the detriment of the planned BB upgrade programme (with currently
another 29 schools at overall sub-standard D or C condition awaiting improvement works).
Any significant funding reduction would increase the risk of further deterioration of
buildings and greater likelihood of reactive repair and maintenance works to keep schools
open and possible activation of contingency plans to manage full or partial closure
scenarios.  Should this option be taken, to mitigate the risk of an increase in repair and
maintenance requirements an increase in this revenue budget should be considered.     
Action 5: Exclude increase in capital borrowing above the agreed prudential borrowing
limit 
5.21  For completeness, the consequences of increasing the Council capital budget have been
included in order to ensure there is clarity as to why this is not a realistic option given the
wider financial context and the level at which the council has already set its capital budget
affordability cap.   Increasing capital borrowing is not advised or recommended. 
5.22  In the report to a meeting of Moray Council on 21 January 2025 on the 3 and 10 Year Capital
Plan (para 7 of minute refers) it was stated that the Council is required to establish the
affordability of its Capital Plan in accordance with the CIPFA Prudential Code. Under the
code, the sustainability of borrowing costs needs to be considered against revenue budget.
The Council has also established an internal Key Performance Indicator, setting an
affordability ceiling of 10%. This is measured as a ratio of financing costs to net revenue
stream. Financing costs are principal and interest loan charges, which also includes
charges associated with the PPP and DBFM school leases. Net revenue stream is defined as
SG Revenue Grant, Council Tax income and NDR income.  This clearly defined limitation of
the amount of revenue which can be influenced by capital expenditure facilitates a full and
separate discussion on capital expenditure whilst retaining consideration of the impact of
capital decisions on revenue requirements.
Page 186

Page 187

5.23  If the Council was to provide for  additional investment for ‘Named’ Future Buckie HS
project this would exceed the affordability ceiling. In order to quantify this, initial
calculations indicate that to invest in a full hybrid new build and reuse option the
affordability ceiling would need to be increased to around 11.1% until at least 2034/35
based on current forecast income and capital spend. Increasing the affordability indicator
would have an unaffordable direct impact on the revenue budget. For context, an additional
£10m of additional capital investment would create a revenue pressure of £750,000 per
annum.  Given the carefully balanced revenue budget position of the Council, this is not
considered to be practical and is not recommended to be taken forward. 
Action 6: Delay any medium to long term project decisions on Future Buckie HS until
future SG Learning Estate investing funding commitment and criteria is known. 
5.24  The SG Learning Estate Investment Programme commits to invest up to £2bn into projects
to improve the condition of the learning estate and/or support capacity growth in schools
across Scotland, delivering sustainable buildings that meet future requirements to be
energy efficient and net zero carbon. The Programme was split into 3 phases, with phase 3
the final declared investment by the current SG administration. 
5.25  There is an expectation that the next SG administration will continue to invest in the
principles of the LEIP, although the actual method of funding is uncertain. This Action
recommends delaying any decision on capital investment in the Future Buckie HS until
there is more detail and assurance from SG on future investment opportunities, beyond
earlier design work to ensure that any project is ‘bid ready’ for SG investment, which it is
hoped we would have within the next 2 years.       
5.26  The next stage of SG funding in the Learning Estate may continue to offer project funding
support using a similar outcome-based revenue funding model that has been applied to
LEIP projects.  This would require Moray Council to formally commit to fully capital fund any
new build or refurbishment project which it may be unable to do so at it may exceed any
future threshold cap on capital borrowing. 
Next Steps 
5.27  Any future options to deliver the Future Buckie HS project are dependent on the current or
future affordability status of the Learning Estate programme. It is recommended that any
strategic decision on future investment in the project should not be scheduled before a
decision on the future of the Elgin HS Capacity Extension project which is awaiting an
independent analysis of the secondary school capacity requirement in south Elgin.   
5.28  Additionally, consideration of any significant investment beyond immediate repair and
maintenance requirements for the current Buckie HS buildings should be scheduled after
here is clarity on any future investment in the Learning Estate Investment Programme or its
successor programme by the Scottish Government. 
5.29   The Learning Estate team will continue to progress works on options for delivering an
affordable project which will consider utilising BB upgrade capital funding and extend
consultancy support to ensure a quick turnaround of a phased/prioritised risk assessed
programme to take advantage of any emerging funding. This will should include a detailed
Page 187

Page 188

determination of the risk impact on the specific cross estate BB upgrade programme of
works if there was a 5-8 year reduction in funding together with robust contingency and
business continuity planning. 
5.30  No single action outlined above would meet the any of the current design and construction
options that have been so far considered to support delivery of the Future Buckie High
School project. Action 1 activity is already in progress, with external consultancy support, to
identify space optimisation and value engineering  to determine the level of cost reduction
that can be realised. Initial discussions have also taken place with SFT and Scottish
Government on how LEIP 2 status, and supporting external funding, could be reassigned to
a specific building at Buckie HS site.   
5.31  As expected there is significant community interest in the future of Buckie High School and
it is planned that a community engagement meeting is held as soon as possible after this
Committee has considered this report. A further report will be submitted to Committee in
November 2025 will updates on progress of all agreed actions. 
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  ✓
Policy and Legal  ✓
Financial ✓ 
Risk ✓ 
Staffing  ✓
Best Value and Transformation  
Property ✓ 
Information Communications Technology/Digital  ✓
Equalities. Social Inclusion and Economic Impact  ✓ 
Climate Change and Biodiversity Impact  ✓ 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute to
improved outcomes for communities as outlined in the following Council Plan strategic
priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following Local
Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
Page 188

Page 189

☒ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population   
6.3  Policy and Legal 
There are no policy or legal implications arising directly from this report
. 
6.4  Financial 
The financial implications are set out in the body of the report. 
It is acknowledged that given the requirement to set an affordable capital spend across
Council services and ensure compliance with prudential borrowing rules, there will be no
significant increases to the 3-year capital budget.  Therefore, there are significant strategic
and operational risks associated that will impact the existing learning estate delivery
strategy that should be fully understood and managed and communicated carefully due to
the associated political and reputational risk implications.  Given the carefully balanced
revenue budget position of the Council, any increase to capital borrowing is not considered
to be practical and is not recommended to be taken forward. 
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend this
Year
Virement
From
Other
Comments
x x x x x x 
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments
x x x x x x 
6.5  Risk
The following risks are already identified and should be noted: 
• Indicative costs take account of current market uncertainty and inflationary forecast. 
There is a risk of continuing market uncertainty throughout the project lifecycle of
any of the design and construction options, with a consequential impact on costs. 
• Buckie HS is one of many schools in Moray with the majority of the core condition
components either graded as C (Poor) or D (Bad) condition.  Without the required
level of investment in the campus buildings the risk of building failures, temporary
closures and/or increase health and safety risks continue to be a concern.   
• The next stage of SG funding in the Learning Estate may continue to offer budget
support via an outcome-based revenue funding model which would require Moray
Council to formally commit to fully capital fund any new build or refurbishment
model which it would be unable to do as it would exceed the current 10% threshold
cap.
Page 189

Page 190

• Any significant delays in commencing or extended phased project delivery of new
build or refurbishment works would be subject to market inflationary risk. 
•  The impact of an already reduced capital budget to the BB programme provides very
limited scope for work to improve condition and will likely result in the BB
programme being extended further than the previously extended 15-year deadline. A
further reduction over the next 5 years in this budget to support affordability options
for Bucke HS  would further increase the risk of asset failure and possible school
closures. 
6.6  Staffing 
There is currently no dedicated project manager assigned to this potentially complex
delivery project.  Most of the workload is currently the responsibility of the Programme
Manager (Learning Estate) which is unsustainable. The future project management
resourcing plan is dependent on the decision to continue, reduce or cancel the Elgin HS
Capacity Extension project. In the event of a cancellation the intent would be to reassign
the Elgin HS project manager to the Buckie HS Future Project. 
It is expected that a dedicated design team would need to be appointed to this project to
progress from the current feasibility to concept and final design – ready for tender. There are
options to resource the team which would include outsourcing, internal recruitment or a
mix of these two approaches. It should be noted that an external design team, who were
working on Elgin HS concept design and have delivered the feasibility studies to date to
support options development for Buckie HS, and therefore who have familiarity with the
design and construction challenges are ready to support further design work. A budget of up
to £50,000 has been allocated for this financial year with up to £500,000 planned but not
committed for next financial year to support this anticipated design activity.  
6.7  Best Value and Transformation 
There are no best value or transformation implications arising directly from this report.  
6.8  Property 
All property implications have been covered in the main body of this report.  
6.9  Information Communications/Technology/Digital 
There are no information communications/technology/digital impacts arising directly from
this report.  
6.10  Equalities, Social Inclusion and Economic Impact
The quality of the learning environment can impact on learning and attainment by as much
as 16%.  The condition and suitability of our learning estate, and capacity challenges
associated with both growth and population decline in some areas, give rise to unequal
opportunity across Moray. 
This proposal supports the Learning Estate Strategy requirement that all Learning Estate
buildings meet minimum standards and are fit for purpose. 
Investment in a major infrastructure project provides opportunity for social and economic
impact. 
Page 190

Page 191

6.11  Climate Change and Biodiversity Impacts
There are no climate change and biodiversity impacts arising directly from this report. 
7.  CONSULTATION 
7.1  This report has been prepared in consultation with the Chief Financial Officer, Head of
Education (Chief Education Officer), Head of Housing and Property, Head of Economic
Growth and Development, Legal Services Manager, Assistant Manager Procurement and
Caroline O’Connor, Committee Services Officer and any comments made have been
incorporated into the report. 
8.  BACKGROUND PAPERS 
8.1
8.2
8.3
8.4
Future Buckie HS LEIP 3 Bid
Feasibility Report - April 2024
Feasibility Report ‘Do Minimum’ - August 2024
Feasibility Report ‘Do Minimum’ (Reduced GIFA) - January 2025    
Page 191

Page 192

APPENDIX 1 
Hub North Scotland Feasibility Study (2023) 
1. The following provides high level review of the 2023 Hub North Scotland
Feasibility Study on 6 hybrid reuse and new build options for the Future Buckie
HS project 
Option 1A: Retain and refurbish swimming pool and fitness centre.  Retain and
refurbish the ‘Old Building’; retain Highfield Hall Extension with minimal
refurbishment and extend with a new build to meet Scottish Futures Trust (SFT)
gross internal floor area (GIFA) requirements for a secondary school.
Pros Cons
• Opportunity for civic frontage and
co-location of services
• 3G pitch and grass playing fields
accessible throughout
construction period
• Significant reuse of buildings
• Existing site access from
surrounding road network retained
and significant improvements to
car parking and bus drop off made
• Challenges with phasing and
minimising disruption to education
during construction
• Significant decant required
• Limited locations for SUD’s
features
• Limited opportunities for future
expansion due to constrained site
layout
• Sewer diversion required
• Challenges with bringing existing
buildings up to current
environmental standards 
Option 1B: Retain and refurbish swimming pool and fitness centre and
secondary school PE facilities.  Retain and refurbish the ‘Old Building’; retain
Highfield Hall Extension with minimal refurbishment and extend with a new
build to meet SFT GIFA requirements for a secondary school.
Pros Cons
• Opportunity for civic frontage and
co-location of services
• Existing PE facilities are not
SportScotland compliant
Page 192

Page 193

• 3G pitch and grass playing fields
accessible throughout
construction period
• Significant reuse of buildings
• Existing site access from
surrounding road network retained
and significant improvements to
car parking and bus drop off made
• Challenges with phasing and
minimising disruption to education
during construction
• Significant decant required
• Limited locations for SUD’s
features
• Limited opportunities for future
expansion due to constrained site
layout
• Sewer diversion required
• Challenges with bringing existing
buildings up to current
environmental standards 
Option 2A: Retain and refurbish swimming pool and fitness centre.  Retain,
refurbish and extend the existing ‘Old Building’ with new build and convert to
use as a 2-stream primary school.  New build secondary school to meet SFT
GIFA requirements. 
Pros Cons
• Opportunity for civic frontage and
co-location of services
• Grass playing fields accessible
throughout construction period
• Single building form offers
education and wayfinding benefits
• Existing site access from
surrounding road network retained
and significant improvements to
car parking and bus drop off made
• Some decant required
• Loss of 3G pitch during
construction
• Limited opportunities for future
expansion due to constrained site
layout
• Sewer diversion required
• Challenges with bringing existing
buildings up to current
environmental standards 
Page 193

Page 194

Option 2B: Retain and refurbish swimming pool and fitness centre and
secondary school PE facilities.  Retain, refurbish and extend the existing ‘Old
Building’ with new build and convert to use as a 2-stream primary school.  New
build secondary school to meet SFT GIFA requirements. 
Pros Cons
• Opportunity for civic frontage and
co-location of services
• Grass playing fields accessible
throughout construction period
• Single building form offers
education and wayfinding benefits
• Existing site access from
surrounding road network retained
and significant improvements to
car parking and bus drop off made
• Existing PE facilities are not
SportScotland compliant
• PE facilities will be split between
existing and new build
• Some decant required
• Loss of 3G pitch during
construction
• Limited opportunities for future
expansion due to constrained site
layout
• Sewer diversion required
• Challenges with bringing existing
buildings up to current
environmental standards 
Option 3A: Retain swimming pool and fitness centre with minimal
refurbishment. Retain existing ‘Old Building’ as wind and watertight structure
Page 194

Page 195

for future use unknown.  New build secondary school to meet SFT GIFA
requirements. 
Pros Cons
• 3G pitch and grass playing fields
accessible throughout
construction period
• Existing site access from
surrounding road network retained
and significant improvements to
car parking and bus drop off made
• Opportunities for future expansion
due to unconstrained site layout
• Single building form offers
education and wayfinding benefits
• Construction site remote from
existing school 
• More flexibility for SUDs features
• Lack of civic frontage and removed
from other surrounding services
• Car parking and bus drop off
location forms undesirable
‘frontage’ to school
• Sewer diversion required
• No reuse of existing buildings for
secondary school use
• New utility supplies required for
new secondary school building 
Option 3B: Retain swimming pool and fitness centre with minimal
refurbishment. Retain existing ‘Old Building’ as wind and watertight structure
for future use unknown.  New build secondary school to meet SFT GIFA
requirements. 
Pros Cons
• Opportunity for civic frontage
• Grass playing fields accessible
throughout construction period
• Existing site access from
surrounding road network retained
and significant improvements to
car parking and bus drop off made
• Single building form offers
education and wayfinding benefits 
• Some decant required
• Loss of 3G pitch during
construction
•  Limited opportunities for future
expansion due to constrained site
layout
• Sewer diversion required
• Challenges with bringing existing
buildings up to current
environmental standards
Page 195

Page 196

2. An options appraisal was then undertaken by the design team to assess the six
options against fifteen criteria: context, operational functionality, construction,
continuity of education, sustainability, orientation massing and shading,
landscaping and ecology, planning considerations, transport, flood risk, utility
infrastructure, underground risks, ground conditions, drainage, future expansion. 
The outcome of the appraisal scored option 3A the highest: 
Option 1A 1B 2A 2B 3A 3B
Score 310 300 325 315 340 315
Ranking 5 6 2 3 1 3 
3. In addition a cost estimate was provided for each option, including authority
costs, which is summarised below: 
Page 196

Page 197

APPENDIX 2
Buckie High School Building Plan 
Page 197

Page 198

North
West
East
South
Page 198

Page 199

Page 199

Page 200

Page 200

Page 201

Report to: Education, Children’s and
Leisure Services
Committee
Meeting Date: 13 May 2025      
Report by: Depute Chief Executive
(Education, Communities
and Organisational
Development
Report No: EDU006/25/DW/HS      
Author: Hazel Sly Contact Email:  education@moray.gov.uk 
Subject: Early Learning and Childcare – Sustainable Rate 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to; 
-  inform the Committee of the updated guidance issued by Scottish Government on
20 February 2025 for setting Early Learning and Childcare (ELC) sustainable rates in
the 2025/26 financial year.
- inform Committee of the additional funding, provided by Scottish Government, to
meet the £12.60 Real living wage commitment in 2025/26.
- Inform Committee of the uplift that will be applied for eligible 2 year olds and
funded 3-5’s
- Inform Committee of the annual percentage uplift for Developmental Nurseries
- inform Committee that the uplift will be backdated to April 2025 as per the
agreement with COSLA. 
1.2  This report is submitted to Committee in terms of Section III (D) (1) of the Council's
Scheme of Administration relating to exercising the functions of the Council as an
Education Authority. 
2.  SUMMARY  
2.1  This report summarises the contents of the Scottish Government guidance, issued on 20
February 2025, in relation to Sustainable rate funding for private funded providers. The
report also provides information on the annual uplift for Developmental Nurseries. 
3.  RECOMMENDATIONS
Item 12.*
Page 201

Page 202

3.1  It is recommended that Committee:   
i)  Scrutinise and note the contents of this report to apply the uplift as detailed
in para 4.5 and 4.6 and as per the publication of the Scottish Government
guidance.   
Hazel Sly
Early Years’ Service Manager 
4.  BACKGROUND AND CONTEXT  
4.1  A report was submitted to Full Council on 12 December 2023 where it was agreed (para 11
of the minute refers) to use the Survey (Costs) approach in current and subsequent
financial years as the standard methodology for setting the sustainable rate for private
funded providers in partnership with Moray Council to provide funded ELC hours. This
approach included allowance for the 2024/25 £12 Real Living Wage (RLW) commitment
within the agreed sustainable rate calculations. It was further agreed that setting the
sustainable rate would be reviewed annually as part of Moray Council’s yearly budget
planning with any uplifts to be applied in the April at the start of each new financial year.  
4.2  Subsequent to this report, further guidance was issued by Scottish Government on 8
March 2024 and updated on 20 February 2025 to outline requirements for setting the
sustainable rate in the respective financial years.  
4.3  The most recent guidance was agreed by COSLA leaders and requires all local authorities
to apply a minimum 3.75% uplift to the 2024/25 sustainable rates with the uplift to take
effect from April 2025. This relates to the Scottish Government commitment for childcare
workers delivering funded ELC in private and third sector services to be paid at least
£12.60 from April 2025.  
4.4  Alongside the additional £16m for 2024/25 that was provided by Scottish Government, a
further £9.7m will be provided for the financial year 2025/26. In 2024/25 there was a
shortfall in funding of £57,600 . The same distribution formula will be used for 2025/26
which results in Moray receiving £173,000.  
4.5  Following the standard methodology that was agreed at a Special Meeting of Moray
Council on 12 December 2023 (para 11 of minute refers), a 5% increase will be applied to
the staffing cost element of the sustainable rate to reflect the increase in the RLW from
£12 to £12.60 per hour. Furthermore a 3.5% increase will be applied to the non-staffing
cost element of the sustainable rate to reflect CPIH in November 2024. Overall this
amounts to 4.6% which is above the minimum requirement of 3.75% from the Scottish
Government. The 4.6% increase means the rate setting process will continue to align with
the agreed standard methodology providing consistency for private funded providers.  
4.6  The figures below give are indicative representation of the financial breakdown; 
Financial year Staffing costs Non staffing costs Sustainable rate
(3-5 YO) total
2024/25 £5.70 £1.42 £7.12
Page 202

Page 203

2025/26 £5.98 £1.47 £7.45 
This means there is a further 33p/hour uplift required to the 3-5’s rate of £7.12 taking the
revised rate to a total of £7.45. There is an additional 39p/hour uplift to the 2’s rate taking it
from £8.55 to a revised total of £8.94.
It is estimated that this further uplift, to meet the requirements from Scottish Government,
will cost £395,000. The increase will be funded from the Scottish Government grant and
the Council budget which included an annual inflationary uplift for the ELC sustainable
rate. The annual inflationary uplift requirement for ELC was noted in the Budget setting
paper that was considered by Full Council in February 2025 (para XX of minute refers). 
This £395k increase also includes an annual percentage uplift to the core funding for
developmental nurseries (Noah’s Ark, Teddy Bear Developmental Nursery and Ladybird
Developmental Nursery) of which this Committee was advised on 14 May 2024 via an
Information report. refers). The rates would increase as detailed below; 
Age Rate 2024-25 Rate 2025-26
0-2 £6.44 £6.74
2’s £5.72 £5.98
3-5’s £5 £5.23 
5.  PROPOSALS  
5.1  Given the requirement from Scottish Government to meet the minimum 3.75% uplift,
Finance and ELC are focussing on financial sustainability for both the providers and
Council. This results in the previously agreed methodology, as noted above, being applied
to achieve a higher rate of uplift, equating to 4.6%, for Moray private funded settings. 
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  X
Policy and Legal X 
Financial X 
Risk  X
Staffing  X
Best Value and Transformation  X
Property  X
Information Communications Technology/Digital             X
Equalities. Social Inclusion and Economic Impact   X
Climate Change and Biodiversity Impact  X 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Page 203

Page 204

Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population   
6.3  Policy and Legal 
There are no legal implications arising directly from this report. However, it is important to
note that the current contract agreement between Moray Council and funded private
providers highlights the following points regarding the sustainable rate; 
- inflationary and RLW increases are reviewed on an annual basis;
- the extent to which an inflationary and RLW changes are reflected in the price for
future years of the contract is subject to the overall level of funding agreed between
Scottish Government and local government for the expanded ELC hours;
- in relation to the sustainable rate setting process, the Council will take into
consideration statutory and non-statutory guidance including as published by
Scottish Government and COSLA;
- the Council may, as a result of the sustainable rate setting process, elect to amend
the price during the period of contract and shall be the sole judge of whether the
price is amended and is under no obligation to implement any price amendment at
any stage;
- the process for setting the price will be conducted in line with Funding Follows the
Child and the National Standard for Early Learning and Childcare Providers:
Guidance for Setting Sustainable Rates from August 2020; and
- the sustainable rate and daily lunch rate will be determined annually by the
Council. 
The full contract agreement can be viewed on the Public Contracts Scotland site.  
6.4  Financial 
The sustainable rate takes account of the full costs of providing funded ELC. Providers
entering into a contract with Moray Council must accept the offered rate.
The updated guidance from Scottish Government issued on 20 February 2025 continues
to stipulate that the rates should be sustainable for local authorities in terms of the
budgets available while also incorporating the following elements; 
- Rate setting should be evidence based, taking account of the cost of providing
ELC in a local area for both eligible 2 year olds and 3-5’s;
Page 204

Page 205

- Rate setting will be applied in a fair and sustainable way, including for
childminders who deliver funded ELC;
- Rates will continue to support delivery of high quality ELC experiences for all
children;
- Rates will enable payment of the RLW for those childcare practitioners delivering
the funded entitlement;
- A separate meal payment rather than a top up of the sustainable rate;
- Evidence of progress to reflect changes in 2025/26 with them being fully
embedded by 2026/27. 
The costs below will be funded by the Scottish Government grant and the Council budget
for inflationary increases which ensure the ELC budget remains balanced. 
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend this
Year
Virement
From
Other
Comments       
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments
ELC 395,000 1 April
2025
395,000   
6.5  Risk 
There are two inherent risks when considering the sustainable hourly rate;
- If the rate is set too low, there is a risk that providers would not be able to remain
financially viable if paying the RLW. Should this be the case then some providers
may seek to alter their service offer to manage business costs.
- If the rate is set too high, there is a risk that this would be sustainable for the
Council to maintain in the 2025/26 financial year and subsequent years. 
The process for setting the hourly rate aims to allow both factors to be balanced;
however, there is a risk to the reputation of the Council as an accredited RLW employer if
the sustainable rate is set too low for providers to continue paying the RLW.  
6.6  Staffing 
There are no staffing implications arising directly from this report.  
6.7  Best Value and Transformation 
There are no best value and transformation implications arising directly from this report.  
6.8  Property 
There are no property implications arising directly from this report.  
6.9  Information Communications/Technology/Digital
Page 205

Page 206

There are no information communications, technology or digital implications arising
directly from this report.  
6.10  Equalities, Social Inclusion and Economic Impact 
An Integrated Impact Assessment (IIA) was completed previously as part of the report
submitted to Full Council on 12 December 2023.  
6.11  Climate Change and Biodiversity Impacts 
There are no climate change and biodiversity implications arising directly from this report. 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with Depute Chief Executive (Education,
Communities and Organisational Development), Head of Education (Chief Education
Officer), Head of Governance, Strategy and Performance, Chief Financial Officer, Nicky
Gosling, Accountant, Equal Opportunities Officer and Caroline O’Connor, Committee
Services Officer and any comments made have been incorporated into the report 
8.  BACKGROUND PAPERS  
8.1     
Page 206

Page 207

Report to: Education, Children’s and
Leisure Services
Committee
Meeting Date: 13 May 2025      
Report by: Depute Chief Executive
(Education, Communities
and Organisational
Development
Report No: EDU012/25/DW/HS      
Author: Hazel Sly Contact Email:  education@moray.gov.uk 
Subject: Singleton Inspections of Early Learning and Childcare Centres –
Published reports September 2024 to March 2025 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to inform Committee of the content of singleton inspection
reports of Early Learning and Childcare (ELC) centres by Care Inspectorate which were
published between September 2024 and February 2025. These were;
Bishopmill Pre school, Elgin
St Sylvesters Nursery, Elgin
East Beach Nursery, Lossiemouth
Knockando Playgroup, Aberlour
Lady Cathcart Nursery, Buckie
The Teddy Bear Developmental Group, Buckie
Portknockie Nursery, Buckie
Findochty Nursery, Findochty
Aberlour Nursery, Aberlour
Aberlour & Craigellachie Pre School, Aberlour 
RAF Lossiemouth Childcare Centre, Lossiemouth
Hop, Skip & Jump, Forres
Earthtime Outdoor Nursery, Duffus               
Kinloss Nursery, Kinloss 
Rainbow Castle, Elgin  
1.2  This report is submitted to Committee in terms of Section III (D) (1) of the Council's Scheme
of Administration relating to exercising the functions of the Council as an Education
Authority. 
2.  SUMMARY  
Item 13.*
Page 207

Page 208

2.1  This report summarises the contents of and evaluations from Care Inspectorate singleton
inspection reports which have been published between September 2024 and February
2025. 
3.  RECOMMENDATIONS  
3.1  It is recommended that Committee:   
i)  Scrutinise and note the contents of this report.   
Hazel Sly
Early Years’ Service Manager 
4.  BACKGROUND AND CONTEXT  
4.1  The Care Inspectorate carries out inspections of care services, including day care of
children’s services. Providers are inspected against a Framework of Quality Themes and
statements and the National Standard.  
4.2  The Care Inspectorate resumed face to face ELC scrutiny in Autumn 2021 after COVID-19
restrictions impacted on their work.  
4.3  The services noted have been scrutinised under the current Care Inspectorate Quality
Framework.  
4.4  Care Inspectorate Officers (CIO) will grade services and publish these grades as part of
their duty to provide information to the public about the quality of care services. 
The six point grading scale: 
6 excellent
5 very good
4 good
3 adequate
2       weak               
1           unsatisfactory  
4.5  Following publication, inspection reports are available through ELC centres and online at
www.careinspectorate.com  
4.6  The education authority will give guidance and support, as appropriate, to both school
nursery classes and partner providers of ELC education. Following a Singleton Inspection
the ELC centre is asked to prepare an action plan indicating how they will address the main
findings of the report, and to share the plan with parents and carers.    
Page 208

Page 209

4.7  During this reporting period there were 13 Singleton Inspection reports received. 
Name of Early Learning and Childcare Provider Date of Inspection
*Bishopmill Pre school, Elgin 29 August 2024
*St Sylvesters Nursery, Elgin 4 September 2024
East Beach Nursery, Lossiemouth 3 October 2024
*Knockando Playgroup, Aberlour 25 October 2024
Lady Cathcart Nursery, Buckie 31 October 2024
*The Teddy Bear Developmental Nursery, Buckie 28 November 2024
*Portknockie Nursery, Buckie 5 December 2024
*Findochty Nursery, Findochty 17 December 2024
Aberlour Nursery, Aberlour 22 January 2025
*Aberlour & Craigellachie Pre School, Aberlour 22 January 2025
*RAF Lossiemouth Childcare Centre, Lossiemouth 6 February 2025
Hop, Skip & Jump, Forres 11 February 2025
Kinloss Nursery, Kinloss 20 February 2025
*Earthtime Outdoor Nursery, Duffus 20 February 2025
Rainbow Castle, Elgin 26 February 2025 
4.8  The Gradings, Recommendations and Requirements arising from the reports are
summarised in Appendix 1.  
4.9  Services marked with a * received grades 4 or above which means they are meeting the
National Standard. These services continue to work in partnership with Moray Council and
have access to the Early Years Teaching Team alongside their respective Continuous
Improvement Officer (CIO). 
4.10  Services not yet reaching grades 4 or above are receiving support from the respective CIO
and the Early Years Teaching and Learning Teacher (T&L) to address the required actions
resulting from the recommendations or requirements. Recommendations are summarised
in Appendix 1.    
Page 209

Page 210

4.11  The table below highlights the area where the grade(s) have dropped and the planned
improvement work to support ELC settings; 
ELC Setting Quality
Framework Area
Plans for
improvement/support
East Beach,
Lossiemouth
How good is our
Setting
To support children’s wellbeing,
play and learning, the provider
will enable all children to have
access to facilities, spaces and
experiences that are
appropriate for them.
Action plan in place created by
Nursery Manager, CIO &
Teaching & Learning teacher
focusing on environment for all
learners.
This will focus on:
a) Children have choices about
the spaces, experiences and
resources they access, indoors
and outdoors, and 
b) Children have access to
appropriate facilities for
personal care and rest
Lady Cathcart
Nursery, Buckie 
How Good Is Our
Care, Play &
Learning 
Action plan created and
updated Jan ’25.
This will focus on;
a) Children will be more
independent especially around
mealtimes and the setting will
improve a family style meal
service 
b) Staff will provide a better
variety of quality play
experiences including
provocations for learning
c) Improve meaningful literacy
& numeracy within all
environments
Page 210

Page 211

How Good Is Our
Leadership 
a) NM to undertake further staff
support & supervision, team
meetings & 1:1
b) NM to audit the updates of
children’s personal plans
c) NM to support staff to build
confidence and ability in their
roles.
Aberlour Nursery,
Aberlour
How Good is Our
Leadership
Action plan created March 2025
This will focus on;
a) Actively involving parents &
carers in the life of the
setting, including in self-
evaluation for improvement
b) The nursery manager will be
supported by the authority to
cover staff absences
effectively
c) The nursery manager will
focus on strategic
improvement, including self-
evaluation and quality
assurance
Hop, Skip & Jump,
Forres
How Good is our
Setting 
CIO, Early Years Service
Manager and Care Inspectorate
Officer met with Nursery
Manager on 24 March 2025 to
discuss recent inspection and
service improvement period.
New action plan set on 25
March 2025 with Nursery
Manager, CIO & Teaching and
Learning Teacher.
This will continue to focus on :
supporting children's wellbeing,
the provider must ensure that
environments and resources
support their play, development
and learning.  The team have
just started planning and are
the early stages – considering
Page 211

Page 212

environment – spaces,
interactions, experiences
The CIO will support the
provider to ensure improved
outcomes for children by
implementing effective and
robust quality assurance
processes.
To achieve this, the provider
must, at a minimum ensure
that:
a) Regular and focused
monitoring and evaluation is
carried out across the setting.
b) Regular supervision and
appraisal meetings are carried
out and recorded to support
ongoing professional
development.
This is a requirement and has
been extended to Thursday, 1
May 2025. 
The team will continue to
support setting with personal
plans and documenting of
relevant information.
The team will continue to
support and promote good
infection control processes,
such as updating nappy
changing area to meet
legislative requirements and
supporting with effective
handwashing measures.
Kinloss Nursery,
Kinloss
How Good is Our
Care, Play and
learning
Action plan to be created with
CIO, Nursery Manager and
Teaching & Learning Teacher on
23rd April.
Page 212

Page 213

This will focus on:
Processes for safeguarding
children, ensuring staff
knowledge of their role and
responsibilities in reporting any
concerns is accurate. 
a) This will include: 
Child protection
procedures are
implemented in
accordance with
national guidance.
b) All staff have a good
understanding of child
protection and
safeguarding and are
clear on their roles and
responsibilities.
c)  Child protection
referrals are made to
lead agencies within
appropriate timescales.
d) The required
notifications are made to
the Care Inspectorate in
line with guidance.
Rainbow Castle,
Elgin 
CIO & Teaching & Learning
Teacher met with current
Nursery manager and acting up
managers on 20th March to
discuss recent Care
Inspectorate report findings. 
As there are concerns raised
over the future of service, it was
agreed CIO would speak to
Care Inspectorate regarding
action plan and focus this term
would be on staff/child/families
well-being and supporting with
children transitioning into
Primary 1.
Page 213

Page 214

How Good is Our
Care, Play and
learning 
How Good is our
Setting 
Teaching & Learning will
continue to support with
planning to ensure quality
experiences are being delivered
to all children in attendance.
This will also support staff if
moving onto other roles.
CIO to liaise with team over
changes in management
structure and future of service.
In addition the following work
will be required; 
To effectively meet children's
individual needs and support
their wellbeing, development
and progress, children’s
personal plans should be
further developed and
streamlined. This should
include but is not limited to,
ensuring all staff are
knowledgeable about each
child’s health and wellbeing
needs, and that tailored care
and support strategies are
provided and used effectively to
meet those needs.
To enable children to be kept
safe, the provider should make
sure that appropriate
procedures and practices are in
place.
This includes but is not limited
to:
(a) Ensuring effective infection
prevention and control
practices and routines are in
place.
(b) Ensuring effective systems
to promote children’s safety
Page 214

Page 215

How Good is our
Leadership
without limiting their
experiences, and
(c) Ensuring that nappy
changing facilities are provided
in line with best practice
guidance. 
By 1 September 2025, the
provider must ensure improved
outcomes for children by
implementing effective and
robust quality assurance
processes. To do this the
provider must, at a minimum,
ensure:
a) Regular, effective, and
focused monitoring is carried
out across the setting.
b) Robust audits are developed
and implemented, and any
actions are addressed
promptly.
c) Clear and effective plans are
developed to maintain and
improve the service.
d) The management team
effectively monitors the work of
each member of staff and the
service as a whole. 
4.12  The current gradings of these services will not impact on their partnership agreement with
Moray Council to deliver funded ELC hours as we believe they have the capacity to improve
with enhanced or targeted support. 
4.13  Any ELC settings not meeting the National Standard, as a result of a recent Care
Inspectorate Inspection, will be supported by their respective CIO to action plan. 
5.  PROPOSALS  
5.1  There are no proposals directly linked to this paper. 
6.  SUMMARY OF IMPLICATIONS  
Page 215

Page 216

6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  X
Policy and Legal X 
Financial  X
Risk  X
Staffing  X
Best Value and Transformation  X
Property  X
Information Communications Technology/Digital             X
Equalities. Social Inclusion and Economic Impact            X 
Climate Change and Biodiversity Impact  X 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute to
improved outcomes for communities as outlined in the following Council Plan strategic
priorities:
☒ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following Local
Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population   
6.3  Policy and Legal 
The Care Inspectorate inspects all registered services regulated under the Public Services
Reform (Scotland) Act 2010, which includes nursery classes and playgroups. 
The authority has a duty to provide a quality early learning and childcare place for every 3
and 4 year old whose parents wish it and for eligible 2 year olds.  
6.4  Financial 
There are no financial implications arising directly from this report. 
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend this
Year
Virement
From
Other
Comments       
Page 216

Page 217

Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments       
6.5  Risk 
There are no risk implications arising directly from this report.  
6.6  Staffing 
There are no staffing implications arising directly from this report.  
6.7  Best Value and Transformation 
There are no best value and transformation implications arising directly from this report.  
6.8  Property 
There are no property implications arising directly from this report.  
6.9  Information Communications/Technology/Digital 
There are no information communications, technology or digital implications arising
directly from this report.  
6.10  Equalities, Social Inclusion and Economic Impact 
There are no equalities, social inclusion or economic implications arising directly from this
report.  However, in relation to 4.11 above, where some ELC settings have seen a reduction
in, or not met the required grade(s) may affect the rights of the child under the UN
Convention on the Rights of the Child (UNCRC.  The planned improvement work to support
some of the recommendations and subsequent improvement actions should help ensure
these rights are being met. 
6.11  Climate Change and Biodiversity Impacts 
There are no climate change and biodiversity implications arising directly from this report. 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with Head of Education (Chief Education
Officer), Continuous Improvement Officer (West and East and the Principal Teacher of Early
Years and the Equal Opportunities Officer. Any comments in relation to prospective
responsibilities have been incorporated into the report.   
8.  BACKGROUND PAPERS  
8.1  None  
Page 217

Page 218

APPENDIX 1 
Summary of numbers of areas for improvement and requirements made to
providers. 
Name of Early Learning and
Childcare Provider
Areas for Improvement Requirements
East Beach Nursery,
Lossiemouth
2 0
Lady Cathcart Nursery, Buckie 2 0
Aberlour Nursery, Aberlour 2 0
Hop, Skip & Jump, Forres 2 1
Kinloss Nursery, Kinloss 1 0 
Details of gradings, recommendation and requirements made to providers. 
East Beach Nursery, Lossiemouth
Unannounced 
Gradings
How Good Is Our Care, Play and Learning 4
How Good Is Our Setting 3
How Good Is Our Leadership 4
How Good Is Our Staff Team 4
(N/A – Not Assessed) 
Areas for Improvement
• To support children’s wellbeing, play and learning, the provider should enable all
children to have access to facilities, spaces and experiences that are appropriate
for them. 
To achieve this, the provider should ensure that, at a minimum:
a) Children have choices about the spaces, experiences and resources they
access, indoors and outdoors, and
b) Children have access to appropriate facilities for personal care and rest. 
This is to ensure that care and support is consistent with the Health and Social
Care Standards (HSCS) which state that: 'As a child, I can direct my own play and
activities in the way that I choose, and freely access a wide range of experiences
and resources suitable for my age and stage, which stimulate my natural curiosity,
learning and creativity' (HSCS 2.27); and 'I experience high quality care and
support based on relevant evidence, guidance, and best practice' (HSCS 4.11). 
• To support the wellbeing and developmental needs of all children, the provider
should review and make appropriate changes to staff deployment. 
To achieve this, the provider should ensure that staff are deployed in a way that
supports equitable, highquality experiences and outcomes for children at all
times.
This is to ensure that care and support is consistent with the Health and Social
Care Standards (HSCS) which state that: ‘My care and support meets my needs
and is right for me’ (HSCS 1.19).
Page 218

Page 219

Requirements
• None 
Lady Cathcart Nursery, Buckie
Unannounced 
Gradings
How Good Is Our Care, Play and Learning 3
How Good Is Our Setting 4
How Good Is Our Leadership 3
How Good Is Our Staff Team 4
(N/A – Not Assessed) 
Areas for Improvement
• To further support children to be meaningfully and actively involved in their play
and learning. The manager and staff should establish a balance of spontaneous
and planned high quality experiences that promote choice, engage children's
imagination and enrich their play and learning. 
This is to ensure that care and support is consistent with the Health and Social
Care Standards (HSCS) which state that: 'As a child I can direct my own play and
activities in the way that I choose, and freely access a wide range of experiences
and resources suitable for my age and stage, which stimulate my natural curiosity,
learning and creativity' (HSCS 2.27). 
This is to ensure children's play and learning is consistent with the Care
Inspectorate documents:
a) A quality framework for daycare of children, childminding and school-aged
childcare
b) Space to grow and thrive
c) Our Creative Journey and
d) The Scottish Government document: Realising the ambition: being me
hub.careinspectorate.com 
• To support improvement that enhances the delivery of high-quality practice,
leaders should continue to establish sound methods of quality assurance.
This is to ensure care and support is consistent with the Health and Social Care
Standards (HSCS) which state that: 'I am supported to give regular feedback on
how I experience my care and support and the organisation uses learning from this
to improve' (HSCS 4.8) and 'I benefit from a culture of continuous improvement,
with the organisation having robust and transparent quality assurance processes'
(HSCS 4.19). 
Requirements
• None 
Page 219

Page 220

Aberlour Nursery, Aberlour
Unannounced 
Gradings
How Good Is Our Care, Play and Learning 4
How Good Is Our Setting 4
How Good Is Our Leadership 3
How Good Is Our Staff Team 4
(N/A – Not Assessed) 
Areas for Improvement
• To support children’s to achieve their potential, the manager should ensure staff
have the knowledge and skills to plan effectively for learning and development. 
This should include but is not limited to, ensuring that planning includes both
responsive and intentional elements.
This is to ensure that care and support is consistent with the Health and Social
Care Standards (HSCS) which state that: 'I am supported to achieve my potential
in education and employment, if this is right for me.' 
• To ensure that children benefit from improvements which have the greatest
positive impacts on their experiences and outcomes, the service should ensure
that they have robust quality assurance processes in place.
This should include but is not limited to:
a) Regular opportunities for reflection and self-evaluation of practice.
b) Regular monitoring of staff practice to identify good quality skills and practice
as well as training needs.
c) Regular monitoring of the quality of children’s experiences and care.
This is to ensure that care and support is consistent with the Health and Social
Care Standards (HSCS) which state that: 'I benefit from a culture of continuous
improvement, with the organisation having robust and transparent quality
assurance processes' (HSCS 4.19). 
Requirements
• None 
Hop, Skip & Jump, Forres
Unannounced 
Gradings
How Good Is Our Care, Play and Learning 3
How Good Is Our Setting 3
How Good Is Our Leadership 2
How Good Is Our Staff Team 3
(N/A – Not Assessed) 
Areas for Improvement
• To ensure that children’s current needs and preferences are planned for and met,
the provider should ensure children’s personal plans are used in practice and are
Page 220

Page 221

reflective of children’s needs. This should include, but is not limited to, ensuring
plans are reviewed and shared with parents/carers, at a minimum of every six
months.
This is to ensure that care and support is consistent with the Health and Social
Care Standards (HSCS) which state that: 'My personal plan (sometimes referred to
as a care plan) is right for me because it sets out how my needs will be met, as
well as my wishes and choices' (HSCS 1.15).
This area for improvement was made on 23 February 2024. 
Action taken since then
• The service had been supported by the local authority to develop their approach to
personal planning.
For example, staff had received training on completing and reviewing learner
profiles which were used to support individual children's development and
learning needs. Parents and carers had been invited into the service to review their
child's personal plan and this was a positive development.
The manager told us that staff were given protected time to review plans for
children in their keyworker group. Since the last inspection, there had been
changes to the team and two new members of staff had been recruited.
Staff told us that whilst they gained confidence from working with local authority
personnel and were positive about mentoring new staff, this had an impact on the
time they had available to complete tasks such as reviewing information. This had
the potential to impact on outcomes for children as well as staff wellbeing.
We acknowledged the progress that the service has made in gathering and
reviewing children's personal planning information with families. The leadership
team now needs to ensure that reviews take place for each child at least every six
months. Developing quality assurance systems to monitor review dates and
consistency will support the provider/manager to achieve this.
This area for improvement has not been met and will remain in place. 
• To ensure that children are kept safe and healthy, the provider should make sure
that the potential spread of infection is minimised. This should include but is not
limited to developing nappy changing areas and supporting children to wash their
hands. 
This is to ensure that care and support is consistent with the Health and Social
Care
Standards (HSCS) which state that: ‘I experience an environment that is well
looked
after with clean, tidy and well maintained premises, furnishings and equipment’
(HSCS 5.24).
This area for improvement was made on 23 February 2024. 
Action taken since then
Handwashing facilities were provided by two portable stations within the main
playroom. These contained water which was at a suitable temperature for
handwashing, and soap and paper towels were available at each station. Children
knew their handwashing routines well and eagerly queued to use the facilities.
We agreed that bringing the handwashing facilities into the playroom had the
potential to benefit children by minimising the risk of the spread of infection.
However at times, staff deployed at these areas were also supporting children at
Page 221

Page 222

the nearby craft table and other activities. As a result, children were not
consistently supported to wash their hands effectively
We advised the leadership team to review staff deployment within the playroom,
particularly at busy times such as mealtimes, to ensure that handwashing could
be effectively supported.
We further advised that routine monitoring of the playroom could help to ensure
that support with handwashing was consistently available. This would help to
keep children safe by minimising the risk of the spread of infection. No changes to
the nappy changing room had taken place since the last inspection. The
provider/manager informed us that a meeting with the hall owner had been
arranged to take forward improvements that would meet best practice guidance.
This area for improvement has not been met and will remain in place 
Requirements 
• By 1 September 2024, the provider must ensure improved outcomes for children
by implementing effective and robust quality assurance processes. To achieve
this, the provider must, at a minimum ensure that:
a) Regular and focused monitoring and evaluation is carried out across the
setting.
b) Regular supervision and appraisal meetings are carried out and recorded to
support ongoing professional development. This is to comply with regulation
4(1)(a) of The Social Care and Social Work Improvement Scotland
(Requirements for Care Services) Regulation 2011 (SSI 2011/210).
This is to ensure care and support is consistent with the Health and Social Care
Standards (HSCS) which state that:
‘I benefit from a culture of continuous improvement, with the organisation having
robust and transparent quality assurance processes’ (HSCS 4.19).
This requirement was made on 23 February 2024. 
Action taken on previous requirement
The service had identified ways in which parents and carers could be given more
opportunities to be involved with nursery improvements. For example, families
had been invited to give feedback on the newly reviewed vision, values and aims.
As a result, some changes to the display in the main playroom had been made and
this was shared with families via a new parent information board. This supported
the service to promote a shared vision that reflected children's and families'
aspirations. 
Further opportunities were planned for parents and carers to come into the
service to review personal planning information and learning journeys with their
child's keyworker.
These were positive developments which had the potential to enhance outcomes
for children. We advised the leadership team to continue to offer regular,
meaningful opportunities for families to come into the service and be involved in
tailoring quality care and support for their children. 
Staff had taken part in training on self-evaluation which was offered by the local
authority. With support from local authority officers, they had begun to use the
improvement cycle to identify and plan a number of changes, including
observations of children's learning and improvements to the outdoor play spaces.
Staff told us that they had found support from the local authority team valuable.
Page 222

Page 223

Additionally, two senior members of the team had taken part in the Care
Inspectorate ELC improvement programme and this had supported them to lead
improvements around mealtimes. Children had also been involved in the
discussions around mealtimes and this helped to build their confidence and self-
esteem.
Whilst a number of improvements had been made, they were not yet consistently
embedded in practice. For example, during snack time some children sat on their
own whilst staff were attending to other children or tasks nearby. As a result,
opportunities for socialising and interactions with other children and staff were
missed. We advised the provider/manager to ensure that staff are supported to
maintain all improvements previously agreed, and that leaders regularly monitor
mealtimes to ensure best practice guidance is followed.
The leadership team had arranged annual review meetings for staff, and at the
start of the new session the staff team had benefited from regular meetings.
However, these formal meetings had not been held since the start of the new year.
Whilst staff continued to get together informally to discuss day to day issues, there
were fewer regular opportunities to discuss practice, planning and service
improvements. As a result, children were not benefiting from shared knowledge
and skills within the team. We advised the leadership team to reinstate regular,
organised opportunities for staff to share knowledge effectively across the team.
This was particularly important as two new members of staff had recently joined
the team.
Quality assurance systems to support quality experiences had not yet been
established. This had an impact on leaders' ability to identify where practice was
inconsistent or not in line with best practice (see mealtime example above). At the
last inspection, we advised the provider/manager to develop a clear programme or
calendar of monitoring aspects of the service. This had not been carried out. 
We agreed to extend the timescale for this requirement, to support the provider/
manager to develop quality assurance systems which support consistently high
quality care, play and learning. These systems should include, but are not limited
to, monitoring staff interactions and deployment; monitoring how children use
spaces and resources, and monitoring the impact of improvements. Records and
procedures should also be regularly audited to ensure that they are in line with
best practice guidance.
The timescale for this requirement has been extended to Thursday, 1 May
2025. 
Kinloss Nursery, Kinloss
Unannounced 
Gradings
How Good Is Our Care, Play and Learning 3
How Good Is Our Setting 5
How Good Is Our Leadership 4
How Good Is Our Staff Team 5
(N/A – Not Assessed) 
Areas for Improvement
Page 223

Page 224

• To safeguard children, the provider should ensure staff knowledge of their role and
responsibilities in reporting any concerns is accurate. 
This should include, but is not limited to ensuring that:
a) Child protection procedures are implemented in accordance with national
guidance.
b) All staff have a good understanding of child protection and safeguarding, and
are clear on their roles and responsibilities.
c) Child protection referrals are made to lead agencies within appropriate
timescales.
d) The required notifications are made to the Care Inspectorate in line with
guidance. 
This is to ensure that care and support is consistent with the Health and Social
Care Standards (HSCS), which state that: 'I am protected from harm, neglect,
abuse, bullying and exploitation by people who have a clear understanding of their
responsibilities' (HSCS 3.20). 
Requirements
• None 
Rainbow Castle, Elgin
Unannounced 
Gradings
How Good Is Our Care, Play and Learning 3
How Good Is Our Setting 3
How Good Is Our Leadership 2
How Good Is Our Staff Team 4
(N/A – Not Assessed) 
Areas for Improvement
• To effectively meet children's individual needs and support their wellbeing,
development and progress, children’s personal plans should be further developed
and streamlined. This should include but is not limited to, ensuring all staff are
knowledgeable about each child’s health and wellbeing needs, and that tailored
care and support strategies are provided and used effectively to meet those
needs. 
This is to ensure care and support is consistent with the Care Inspectorate
document, 'Guide for providers on personal planning.'
This is to ensure that care and support is consistent with the Health and Social
Care Standards (HSCS) which state that:
My personal plan (sometimes referred to as a care plan) is right for me because it
sets out how my needs will be met, as well as my wishes and choices' (HSCS
1.15); and 'My care and support meets my needs and is right for me' (HSCS 1.19). 
• To enable children to be kept safe, the provider should make sure that appropriate
procedures and practices are in place. This includes but is not limited to:
Page 224

Page 225

a) Ensuring effective infection prevention and control practices and routines
are in place.
b) Ensuring effective systems to promote children’s safety without limiting their
experiences, and
c) Ensuring that nappy changing facilities are provided in line with best practice
guidance.
This is to ensure that care and support is consistent with the Health and Social
Care Standards (HSCS) which state that: ‘My environment is secure and safe’
(HSCS 5.19); and 'If I require intimate personal care, this is carried out in a
dignified way, with my privacy and personal preferences respected' (HSCS 1.4). 
Requirements
• By 1 September 2025, the provider must ensure improved outcomes for children
by implementing effective and robust quality assurance processes. To do this the
provider must, at a minimum, ensure:
a) Regular, effective, and focused monitoring is carried out across the setting.
b) Robust audits are developed and implemented, and any actions are
addressed promptly.
c) Clear and effective plans are developed to maintain and improve the service.
d) The management team effectively monitors the work of each member of
staff and the service as a whole.
This is to comply with Regulation 3 Principles and Regulation 15 (a) and (b) Staffing
of The Social Care and Social Work Improvement Scotland (Requirements for Care
Services) Regulations 2011 (SSI 2011/210).
This is to ensure that care and support is consistent with the Health and Social
Care Standards (HSCS) which state that: 'I benefit from a culture of continuous
improvement, with the organisation having robust and transparent quality
assurance processes' (HSCS 4.19). 
Previous areas for improvement
1. To support children’s care, wellbeing and development needs, the provider should
ensure staff are supported to develop their skills in high quality interactions. This
is to ensure that children experience consistently positive interactions; and to
effectively enable children to facilitate and extend their own play.
This is to ensure that care and support is consistent with the Health and Social
Care Standards (HSCS) which state that: 
'As a child I can direct my own play and activities in the way that I choose, and
freely access a wide range of experiences and resources suitable for my age and
stage, which stimulate my natural curiosity, learning and creativity' (HSCS 2.27);
and
‘I have confidence in people because they are trained, competent and skilled, are
able to reflect on their practice and follow their professional and organisational
codes’ (HSCS 3.14).
This area for improvement was made on 21 June 2019. 
Action taken since then:
The previous area for improvement stated: 'Children should be able to enjoy a rich
environment that is well thought out and includes a wealth of open ended, real life
and natural materials both inside and outside, that encourage children to be
imaginative, inventive and creative.'
Page 225

Page 226

Improvements had been made to the layout of the indoor and outdoor spaces, and
the range of resources available in each space. Children were accessing spaces
and resources well and this was helping them to be creative and use their
imaginations.
Staff were not consistently confident in supporting high-quality interactions and
would benefit from further training and sustained opportunities to build their skills
and confidence. This could further support children to develop their play and
learning. 
This area for improvement has not been met and remains in place. 
2. A continuous and well-judged pace of change linked to strong self-evaluation for
improvement should be established, that has a positive impact on outcomes for
children. This includes but is not limited to:
Monitoring methods of practice such as personal care plans, learning journals,
accidents/incidents;
observation and reflection of practice by the manager and staff; clearly identified
and measurable targets/action plan.
This is to ensure that care and support is consistent with the Health and Social
Care Standards (HSCS) which state that:
'I benefit from a culture of continuous improvement, with the organisation having
robust and transparent quality assurance processes.' (HSCS 4.19).
This area for improvement was made on 21 June 2019. 
Action taken since then
We acknowledged the work done by the current manager, supported by education
staff from the local authority, to begin to address self-evaluation, quality
assurance and continuous improvement within the service. However, these
systems were at very early stages of development and were not yet having a
significantly positive impact on outcomes for children. They were not yet
consistently embedded in practice.
We expressed concerns about the capacity of the service to move forward with
identified improvements and maintain quality of care for children and wellbeing of
staff without robust interim management arrangements in place.
The timescale for the new requirement accounts for recruitment of the new
manager to be completed and time for the new manager to ensure that quality
assurance systems that support high quality care and support for children are in
place. 
This area for improvement has not been met and will be escalated to a
requirement (See above). 
3. The provider should ensure that the manager and staff are supported to develop
and maintain the necessary skills to provide quality experiences for children.
This should be achieved through:
a) The development of quality induction programmes for managers and staff.
b) A central training plan that identifies individual and group learning needs that
is effectively monitored, and
c) Evaluation of the impact of training, how it has been implemented in practice
and how it has had a positive impact on outcomes for children.
Page 226

Page 227

This is to ensure that care and support is consistent with the Health and Social
Care Standards (HSCS) which state that:
'I have confidence in the people because they are trained, competent and skilled,
are able to reflect on their practice and follow their professional and
organisational codes' (HSCS 3.14); and
'I am confident that people are encouraged to be innovative in the way they
support and care for me.' (HSCS 4.25). 
This area for improvement was made on 21 June 2019. 
Action taken since then
Since the current manager came in to post in October 2024, a large amount of
training needs have been identified and plans put in place to support this. Staff
told us that they have valued the support and training that has been available to
them. The service now needs time to apply this training in practice and to evaluate
impact on outcomes for children.
We advised the provider to have robust plans in place for a new manager, to
identify their training and mentoring needs when they take up the post. We also
advised that the plan includes ways for the new manager to access support
relating to managing a childcare service. 
This area for improvement has not been met and remains in place. 
Page 227

Page 228

Page 228

Page 229

Report to: Education, Children’s and
Leisure Services
Committee
Meeting Date: 13 May 2025      
Report by: Depute Chief Executive
(Education, Communities
and Organisational
Development
Report No: EDU011/25/DW/HS      
Author: Hazel Sly Contact
Email: 
education@moray.gov.uk 
Subject: Education Scotland Inspection of Burghead Nursery, Burghead 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to inform the Committee of the outcomes of the recently
published report on a Moray Early Learning and Childcare (ELC) setting following
inspection by Education Scotland.  
1.2  This report is submitted to Committee in terms of Section III (D) (1) of the Council's
Scheme of Administration relating to exercising the functions of the Council as an
Education Authority. 
2.  SUMMARY  
2.1  This report summarises the contents of and evaluations from an Education Scotland visit
at Burghead Nursery. 
3.  RECOMMENDATIONS  
3.1  It is recommended that Committee:   
i)  Scrutinise and note the contents of this report and findings of Education
Scotland following their inspection.   
Hazel Sly
Early Years’ Service Manager 
4.  BACKGROUND AND CONTEXT  
4.1  When an ELC setting is inspected by Education Scotland a report is published (by
Education Scotland) which gives commentary on the setting’s performance. These
reports are presented regularly to this Committee, where possible at the first available
opportunity after publication.
Item 14.*
Page 229

Page 230

4.2  In January 2025, Education Scotland inspected Burghead Nursery, Burghead using
the Short Inspection Model.  
4.3  The key features of the short inspection visit model were; 
- The team comprised of two inspectors.
- The inspector spent 2 ½ days at the setting, including time for initial scoping
and feedback.
- The team inspecting Nursery liaised with the team inspecting School  
4.4  The Education Scotland Inspection team use selected Quality Indicators 
(QI’s) from the How Good is our Early Learning and Childcare (HGIOELC) 
quality framework which were evaluated using the six point scale, namely; 
QI 2.3 – Learning, Teaching and Assessment  
QI 3.2 - Securing Children’s Progress  
4.5  The inspectors also had a focus on safeguarding as is the case in every inspection.  
4.6  The inspection findings indicated that Burghead Nursery has the capacity to continue to
improve and Education Scotland will make no more visits in connection with this
inspection.  
4.7  The summary of the inspection report is contained in Appendix 1. The original
inspection report and summary of inspection findings can be viewed at; Burghead
Nursery | Inspection Report | Education Scotland 
5.  PROPOSALS  
5.1  There are no proposals directly linked to this paper. 
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement
Plan) 
X
Policy and Legal X 
Financial  X
Risk  X
Staffing  X
Best Value and Transformation  X
Property  X
Information Communications Technology/Digital             X
Equalities. Social Inclusion and Economic Impact   X
Climate Change and Biodiversity Impact  X 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans.
Page 230

Page 231

a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following Council
Plan strategic priorities:
☒ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population   
6.3  Policy and Legal 
This report relates to Section 66 of the Education (Scotland) Act 1980, which concerns
the inspection of educational establishments.  
6.4  Financial 
There are no financial implications arising directly from this report. 
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend
this Year
Virement
From
Other
Comments       
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments       
6.5  Risk 
There are no risk implications arising directly from this report. 
6.6  Staffing 
There are no staffing implications arising directly from this report.  
6.7  Best Value and Transformation 
There are no best value and transformation implications arising directly from this report.  
6.8  Property 
There are no property implications arising directly from this report.  
6.9  Information Communications/Technology/Digital 
There are no information communications, technology or digital implications arising
directly from this report.  
6.10  Equalities, Social Inclusion and Economic Impact 
There are no equalities, social inclusion or economic implications arising directly from
this report.
Page 231

Page 232

6.11 Climate Change and Biodiversity Impacts
There are no climate change and biodiversity implications arising directly from this
report.
7. CONSULTATION
7.1 This report has been prepared in consultation with Head of Education (Chief Education
Officer), Continuous Improvement Officer (West) the Principal Teacher of Early Years.
Any comments in relation to prospective responsibilities have been incorporated into the
report.
8. BACKGROUND PAPERS
8.1 Burghead Nursery | Inspection Report | Education Scotland
Page 232

Page 233

1   |    Burghead Primary School Nursery Class, Moray Council, 5200520 © Crown Copyright
11 February 2025
Dear Parent/Carer
In January 2025, a team of inspectors from Education Scotland visited Burghead Primary
School Nursery Class. During our visit, we talked to parents/carers and worked closely with the
manager and staff.
The inspection team found the following strengths in the setting’s work.
• Positive, nurturing relationships between all staff and children. Senior leaders and
practitioners do their very best to ensure children feel safe, confident and included.
Children thrive within the family of Burghead Nursery Class.
• Children who are motivated, curious and eager to learn. The manager and practitioners
have created a calm and relaxed environment for children to learn through rich learning
experiences.
• Extensive use of the local community. This provides children with a wide variety of
opportunities to help them learn about the community in which they live. As a result,
children gain a deep knowledge about the people, places and wildlife in their local area.
They are valued members of their community.
• Skilful interactions of the manager and practitioners which extend and deepen
children’s thinking. They know children very well as individuals and as learners.
As a result, children make very good progress in their learning.
The following areas for improvement were identified and discussed with the manager/ and a
representative from Moray Council.
• Streamline the approaches to planning, recording and tracking children’s learning.
This should avoid duplication of documentation and provide a clear and coherent
picture of the significant aspects of children’s learning and development.
APPENDIX 1
Page 233

Page 234

2   |    Burghead Primary School Nursery Class, Moray Council, 5200520 © Crown Copyright
We gathered evidence to enable us to evaluate the setting’s work using quality indicators from
How good is our early learning and childcare?. Quality indicators help learning and childcare
settings, local authorities and inspectors to judge what is working well and what needs to be
improved. 
Here are Education Scotland’s evaluations for Burghead Primary
School Nursery Class 
Quality indicators for the nursery class Evaluation
Learning, teaching and assessment very good
Securing children’s progress very good
Descriptions of the evaluations are available from:
How good is our early learning and childcare? Appendix 1: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on the
Education Scotland website at: 
Burghead Primary School | Inspection Report | Education Scotland 
What happens next? 
We are confident that the setting has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. Moray Council will inform parents/carers about
the school’s progress as part of its arrangements for reporting on the quality of its settings. 
Sandra Kehoe
HM Inspector
Page 234

Page 235

Report to: Education, Children’s
and Leisure Services
Committee 
Meeting Date: 13 May 2025  
Report by: Depute Chief Executive
(Education, Communities
and Organisational
Development) 
Report No: EDU014/25/SMcL/AMB  
Author: Stewart McLauchlan Contact
Email:
education@moray.gov.uk   
Subject: Education Scotland Inspection of St Gerardine Primary School 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to inform the Committee of the outcomes of a recently
published report on a Moray school following inspection by Education Scotland’s His
Majesty’s Inspectors of Education (HMIE)  
1.2  This report is submitted to Committee in terms of Section III (D) (1) of the Council’s
Scheme of Administration relating to all the functions of the Council as an Education
Authority. 
2.  SUMMARY  
2.1  This report summarises the positive outcome from Education Scotland HMIE inspection
in October 2024 for St Gerardine Primary School.  The school was subject to a short
inspection model visit where both Quality Indicators reported upon were graded as
Good.  Following their inspection visit and publication of report in February 2025,
Education Scotland HMIE have indicated that the school has the capacity to continue
to improve and will make no more visits in connection with this inspection. 
3.  RECOMMENDATIONS  
3.1  It is recommended that Committee:   
i)  scrutinise and note the contents of this report and findings of Education
Scotland HMIE following their inspection visit.   
Stewart McLauchlan
Quality Improvement Manager 
4.  BACKGROUND AND CONTEXT  
Item 15.*
Page 235

Page 236

4.1  When a school is inspected by Education Scotland HMIE, a report is published which
gives commentary on the school’s performance.  These reports are presented regularly
to Committee, where possible at the first available opportunity after publication. 
4.2  In October 2024, a team of inspectors from Education Scotland HMIE visited St
Gerardine Primary School.  During their visit, inspectors talked to parents/carers and
children and worked closely with the Head Teacher and staff.    
4.3  St Gerardine Primary School was subject to a short inspection model visit spanning
over three days in total.  
4.4  The Education Scotland Inspection team use selected Quality Indicators (QIs)
from How good is our school? 4th edition (HGIOS4), rated using the six-point
scale.    
4.5  Education Scotland HMIE focus QIs for the Primary school (short model inspection)
are: 
QI 2.3 Learning, Teaching and Assessment
QI 3.2 Raising Attainment and Achievement  
4.6  Similar to the full inspection model which cover an additional two QIs (QI 1.3 –
Leadership of Change and QI 3.1 – Wellbeing, Equality and Inclusion), short model
inspections also include focus on Safeguarding and Child Protection processes.  
4.7  Following further dialogue between Education Scotland HMIE and the local authority,
Education Scotland published St Gerardine Primary School’s Inspection Report on 4
February 2025 with the following gradings: 
QI 2.3 Learning, teaching and assessment Good
QI 3.2 Raising attainment and achievement Good 
4.8  The inspection team found the following strengths in the school’s work: 
• Children and staff are proud of their school and community. They have developed
very positive learning environments based on the school values of being respectful,
responsible, resilient and demonstrating kindness. Children are happy and are
welcoming to visitors.
• Led very ably by the headteacher and senior leaders, staff have created a highly
positive, nurturing and supportive ethos. Staff know children very well, both as
individuals and as learners.
• Staff’s collaborative and responsive approaches to tracking and monitoring
individual children’s progress is leading to improved outcomes for children.
• Staff work very effectively with a wide range of partner agencies. Children benefit
from these partnerships through a wide range of universal and targeted support.
This is improving outcomes for children.  
4.9  The inspection team agreed the following areas for improvement with the Head
Teacher and Moray Education: 
• Staff should continue to develop their understanding of higher-order thinking skills.
This should support an increased level of challenge leading children to make
greater progress in their learning.
• Teachers should continue to work collaboratively on the development of whole
school approaches to raising attainment in writing.
Page 236

Page 237

• Senior leaders should continue with their plans track and monitor children’s skills
and achievements. This will help them to identify and target gaps in children’s
learning and experiences.  
4.10  The Education Scotland HMIE inspection report and summary of inspection findings for
the school can be viewed at: 
Inspection Report
Summarised Inspection Findings
Additional Inspection Evidence  
4.11  Following inspection, Education Scotland HMIE have advised that they are confident
that the school has the capacity to continue to improve and will make no more visits in
connection with the inspection.    
4.12  As a local authority the Council  will continue to inform key stakeholders including
parents/carers on the school’s progress through normal arrangements on reporting on
quality of schools.  
4.13  In further recognition of this positive inspection outcome, a Press Release was
published on 4 February 2025 (day of Education Scotland HMIE report publication) to
recognise the strengths recognised by the inspection team as well as actions underway
to address areas for improvement identified.  
4.14  For reference, the Education Scotland HMIE visit report published in February 2025
following visit in October 2024 is contained within Appendix 1. 
5.  PROPOSALS  
5.1  It is proposed that the Committee scrutinise and note the contents of this report,
following positive short model inspection visit by Education Scotland HMIE as outlined
above, to St Gerardine Primary School.  
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations
are agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement
Plan)
 
Policy and Legal  
Financial  
Risk  
Staffing  
Best Value and Transformation  
Property  
Information Communications Technology/Digital  
Equalities. Social Inclusion and Economic Impact   
Climate Change and Biodiversity Impact   
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Page 237

Page 238

Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following
Council Plan strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population   
6.3  Policy and Legal 
HM Inspectors’ powers to inspect educational establishments and services are set out
in legislation and referred to within section 135(1) of the Education (Scotland) Act 1980. 
HM Inspectors (HMIs) have statutory functions of inspection conferred on them by Part
III of the 1980 Act.  Responsibility for the quality of education delivery rests with the
relevant local authority, as defined in section 1 (1) of the Education (Scotland) Act 1980
and further detailed within the Standards in Scotland’s Schools etc. Act 2000. 
6.4  Financial 
There are no financial implications arising directly from this report. 
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend
this Year
Virement
From
Other
Comments
- - - - - - 
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments
- - - - - - 
6.5  Risk 
There are no risk implications arising directly from this report.  
6.6  Staffing 
There are no staffing implications arising directly from this report.  
6.7  Best Value and Transformation 
There are no Best Value and Transformation implications where this report is to inform
Committee on school performance following external scrutiny/validation activity.  
6.8  Property 
There are no property implications arising directly from this report.  
Page 238

Page 239

6.9  Information Communications/Technology/Digital
There are no Information Communications/Technology/Digital implications arising
directly from this report.
6.10 Equalities, Social Inclusion and Economic Impact
An Equality/Socio Economic Impact Assessment is not required as this report is to
inform Committee on school performance following external scrutiny/validation activity.
6.11 Climate Change and Biodiversity Impacts
No climate change or biodiversity implications have been determined due to the
scrutiny based nature of activities reported and no findings related to such implications
contained herein.    
7. CONSULTATION
7.1  This report has been prepared in consultation with the Head of Education (Chief
Education Officer), Equal Opportunities Officer, Human Resources Manager, Caroline
O’Connor, Committee Services Officer, Senior Officers in Education and the Head
Teacher of St Gerardine Primary School and any comments made have been
incorporated into the report.
8. BACKGROUND PAPERS
8.1  Inspection Report
Summarised Inspection Findings
Additional Inspection Evidence
Press Release
How good is our school? 4th edition
Education Scotland six-point scale
Page 239

Page 240

1   | St Gerardine Primary School, Moray Council, 5202221 © Crown Copyright
4 February 2025
Dear Parent/Carer
In October 2024, a team of inspectors from Education Scotland visited St Gerardine School.
During our visit, we talked to parents/carers and children and worked closely with the
headteacher and staff.
The inspection team found the following strengths in the school’s work.
• Children and staff are proud of their school and community. They have developed very
positive learning environments based on the school values of being respectful, responsible,
resilient and demonstrating kindness. Children are happy and are welcoming to visitors.
• Led very ably by the headteacher and senior leaders, staff have created a highly positive,
nurturing and supportive ethos. Staff know children very well, both as individuals and as
learners.
• Staff’s collaborative and responsive approaches to tracking and monitoring individual
children’s progress is leading to improved outcomes for children.
• Staff work very effectively with a wide range of partner agencies. Children benefit from these
partnerships through a wide range of universal and targeted support. This is improving
outcomes for children.
The following areas for improvement were identified and discussed with the headteacher and a
representative from Moray Council.
• Staff should continue to develop their understanding of higher-order thinking skills. This
should support an increased level of challenge leading children to make greater progress in
their learning.
• Teachers should continue to work collaboratively on the development of whole school
approaches to raising attainment in writing.
• Senior leaders should continue with their plans track and monitor children’s skills and
achievements. This will help them to identify and target gaps in children’s learning and
experiences.
APPENDIX 1
Page 240

Page 241

2   |    St Gerardine Primary School, Moray Council, 5202221 © Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using quality indicators from
How good is our school? (4th edition). Quality indicators help schools, local authorities and
inspectors to judge what is working well and what needs to be improved. Following the
inspection of each school, the Scottish Government gathers details of our evaluations to keep
track of how well Scottish schools are doing. 
Here are Education Scotland’s evaluations for St Gerardine School 
Quality indicators Evaluation
Learning, teaching and assessment good
Raising attainment and achievement good
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on the
Education Scotland website at: 
St Gerardine Primary School | Inspection Report | Education Scotland 
What happens next? 
We are confident that the school has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. Moray Council will inform parents/carers about
the school’s progress as part of its arrangements for reporting on the quality of its schools. 
Susan McDade
HM Inspector
Page 241

Page 242

Page 242

Page 243

Report to: Education, Children’s
and Leisure Services
Committee 
Meeting Date: 13 May 2025  
Report by: Depute Chief Executive
(Education, Communities
and Organisational
Development) 
Report No: EDU015/25/SMcL/AMB  
Author: Stewart McLauchlan Contact
Email:
education@moray.gov.uk 
Subject: Education Scotland Inspection of Burghead Primary School 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to inform the Committee of the outcomes of a recently
published report on a Moray school following inspection by Education Scotland’s His
Majesty’s Inspectors of Education (HMIE)  
1.2  This report is submitted to Committee in terms of Section III (D) (1) of the Council’s
Scheme of Administration relating to all the functions of the Council as an Education
Authority. 
2.  SUMMARY  
2.1  This report summarises the positive outcome from Education Scotland HMIE inspection
in January 2025 for Burghead Primary School.  The school was subject to a short
inspection model visit where both Quality Indicators reported upon were graded as
Satisfactory.  Following their inspection visit and publication of report in March 2025,
Education Scotland HMIE have indicated that the school has the capacity to continue
to improve and will make no more visits in connection with this inspection. 
3.  RECOMMENDATIONS  
3.1  It is recommended that Committee:   
i)  scrutinise and note the contents of this report and findings of Education
Scotland HMIE following their inspection visit.   
Stewart McLauchlan
Quality Improvement Manager 
4.  BACKGROUND AND CONTEXT  
Item 16.*
Page 243

Page 244

4.1  When a school is inspected by Education Scotland HMIE, a report is published which
gives commentary on the school’s performance.  These reports are presented regularly
to Committee, where possible at the first available opportunity after publication. 
4.2  In January 2025, a team of inspectors from Education Scotland HMIE visited Burghead
Primary School.  During their visit, inspectors talked to parents/carers and children and
worked closely with the Acting Head Teacher and staff.    
4.3  Burghead Primary School was subject to a short inspection model visit spanning over
three days in total.  
4.4  The Education Scotland Inspection team use selected Quality Indicators (QIs)
from How good is our school? 4th edition (HGIOS4), rated using the six-point
scale.    
4.5  Education Scotland HMIE focus QIs for the Primary school (short model inspection)
are: 
QI 2.3 Learning, Teaching and Assessment
QI 3.2 Raising Attainment and Achievement  
4.6  Similar to the full inspection model which cover an additional two QIs (QI 1.3 –
Leadership of Change and QI 3.1 – Wellbeing, Equality and Inclusion), short model
inspections also include focus on Safeguarding and Child Protection processes.  
4.7  Following further dialogue between Education Scotland HMIE and the local authority,
Education Scotland published Burghead Primary School’s Inspection Report on 4
March 2025 with the following gradings: 
QI 2.3 Learning, teaching and assessment Satisfactory
QI 3.2 Raising attainment and achievement Satisfactory 
4.8  The inspection team found the following strengths in the school’s work: 
• The warm, welcoming and caring ethos which provides a positive and calm learning
environment for children. Led effectively by the acting headteacher, all staff ensure
that positive and nurturing relationships exist between children and between
children and staff. As a result, children are polite and respectful. They demonstrate
high standards of positive behaviour and are engaged and motivated to learn. 
• Recent improvements to systems and processes for gathering and using
information on children’s progress. This is supporting staff to have a better
understanding of children’s progress over time.
• Creative approaches to learning using the local community and a variety of outdoor
spaces. Staff have established strong partnerships within their community to
support this. Children gain a range of skills and attributes through these
experiences.  
4.9  The inspection team agreed the following areas for improvement with the Acting Head
Teacher and Moray Education: 
• The acting headteacher and staff should continue to improve the quality of learning
and teaching. They need to ensure all children experience consistently high-quality
learning experiences, which are set with the right level of support and challenge.
• Raise attainment in literacy and numeracy across the school.
• Improve approaches to the ways teachers assess children’s progress. This is to
Page 244

Page 245

ensure all children make the best possible progress in their learning.  
4.10  The Education Scotland HMIE inspection report and summary of inspection findings for
the school can be viewed at: 
Inspection Report
Summarised Inspection Findings
Additional Inspection Evidence  
4.11  Following inspection, Education Scotland HMIE have advised that they are confident
that the school has the capacity to continue to improve and will make no more visits in
connection with the inspection.    
4.12  As a local authority we will continue to inform key stakeholders including parents/carers
on the school’s progress through normal arrangements on reporting on quality of
schools.  
4.13  In further recognition of this positive inspection outcome, a Press Release was
published on 4 March 2025 (day of Education Scotland HMIE report publication) to
recognise the strengths recognised by the inspection team as well as actions underway
to address areas for improvement identified.  
4.14  For reference, the Education Scotland HMIE visit report published in March 2025
following visit in January 2025 is contained within Appendix 1. 
5.  PROPOSALS  
5.1  It is proposed that the Committee scrutinise and note the contents of this report,
following positive short model inspection visit by Education Scotland HMIE as outlined
above, to Burghead Primary School.  
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations
are agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement
Plan)
 
Policy and Legal  
Financial  
Risk  
Staffing  
Best Value and Transformation  
Property  
Information Communications Technology/Digital  
Equalities. Social Inclusion and Economic Impact   
Climate Change and Biodiversity Impact   
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and
Page 245

Page 246

contribute to improved outcomes for communities as outlined in the following
Council Plan strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population 
6.3  Policy and Legal 
HM Inspectors’ powers to inspect educational establishments and services are set out
in legislation and referred to within section 135(1) of the Education (Scotland) Act 1980. 
HM Inspectors (HMIs) have statutory functions of inspection conferred on them by Part
III of the 1980 Act.  Responsibility for the quality of education delivery rests with the
relevant local authority, as defined in section 1 (1) of the Education (Scotland) Act 1980
and further detailed within the Standards in Scotland’s Schools etc. Act 2000. 
6.4  Financial 
There are no financial implications arising directly from this report. 
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend
this Year
Virement
From
Other
Comments
- - - - - - 
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments
- - - - - - 
6.5  Risk 
There are no risk implications arising directly from this report.  
6.6  Staffing 
There are no staffing implications arising directly from this report.  
6.7  Best Value and Transformation 
There are no Best Value and Transformation implications where this report is to inform
Committee on school performance following external scrutiny/validation activity.  
6.8  Property 
There are no property implications arising directly from this report.  
Page 246

Page 247

6.9  Information Communications/Technology/Digital 
There are no Information Communications/Technology/Digital implications arising
directly from this report.  
6.10  Equalities, Social Inclusion and Economic Impact 
An Equality/Socio Economic Impact Assessment is not required as this report is to
inform Committee on school performance following external scrutiny/validation activity.  
6.11  Climate Change and Biodiversity Impacts 
No climate change or biodiversity implications have been determined due to the
scrutiny based nature of activities reported and no findings related to such implications
contained herein.     
7.  CONSULTATION  
7.1  This report has been prepared in consultation with the Head of Education (Chief
Education Officer), Equal Opportunities Officer, Human Resources Manager, Caroline
O’Connor, Committee Services Officer, Senior Officers in Education and the Acting
Head Teacher of Burghead Primary School and any comments made have been
incorporated into the report. 
8.  BACKGROUND PAPERS  
8.1  Inspection Report
Summarised Inspection Findings
Additional Inspection Evidence
Press Release
How good is our school? 4th edition
Education Scotland six-point scale 
Page 247

Page 248

1   |    Burghead Primary School, Moray Council, 5200520 © Crown Copyright
4 March 2025
Dear Parent/Carer
In January 2025, a team of inspectors from Education Scotland visited Burghead Primary
School. During our visit, we talked to parents/carers and children and worked closely with
the acting headteacher and staff.
The inspection team found the following strengths in the school’s work.
• The warm, welcoming and caring ethos which provides a positive and calm learning
environment for children. Led effectively by the acting headteacher, all staff ensure that
positive and nurturing relationships exist between children and between children and staff.
As a result, children are polite and respectful. They demonstrate high standards of positive
behaviour and are engaged and motivated to learn.
• Recent improvements to systems and processes for gathering and using information on
children’s progress. This is supporting staff to have a better understanding of children’s
progress over time.
• Creative approaches to learning using the local community and a variety of outdoor spaces.
Staff have established strong partnerships within their community to support this. Children
gain a range of skills and attributes through these experiences.
The following areas for improvement were identified and discussed with the acting headteacher
and a representative from Moray Council.
• The acting headteacher and staff should continue to improve the quality of learning and
teaching. They need to ensure all children experience consistently high-quality learning
experiences, which are set with the right level of support and challenge.
• Raise attainment in literacy and numeracy across the school.
• Improve approaches to the ways teachers assess children’s progress. This is to ensure all
children make the best possible progress in their learning.
APPENDIX 1
Page 248

Page 249

2   |    Burghead Primary School, Moray Council, 5200520 © Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using quality indicators from
How good is our school? (4th edition). Quality indicators help schools, local authorities and
inspectors to judge what is working well and what needs to be improved. Following the
inspection of each school, the Scottish Government gathers details of our evaluations to keep
track of how well Scottish schools are doing. 
Here are Education Scotland’s evaluations for Burghead Primary
School 
Quality indicators Evaluation
Learning, teaching and assessment satisfactory
Raising attainment and achievement satisfactory
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on the
Education Scotland website at: 
Burghead Primary School | Inspection Report | Education Scotland 
What happens next? 
We are confident that the school has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. Moray Council will inform parents/carers about
the school’s progress as part of its arrangements for reporting on the quality of its schools. 
Judith Reid
HM Inspector
Page 249

Page 250

Page 250

Page 251

Report to: Education, Children’s
and Leisure Services
Committee 
Meeting Date: 13 May 2025  
Report by: Depute Chief Executive
(Education, Communities
and Organisational
Development) 
Report No: EDU013/25/SMcL/AMB  
Author: Stewart McLauchlan Contact
Email:
education@moray.gov.uk   
Subject: Education Scotland Inspection of Mosstowie Primary School 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to inform the Committee of the outcomes of a recently
published report on a Moray school following inspection by Education Scotland’s His
Majesty’s Inspectors of Education (HMIE)  
1.2  This report is submitted to Committee in terms of Section III (D) (1) of the Council’s
Scheme of Administration relating to all the functions of the Council as an Education
Authority. 
2.  SUMMARY  
2.1  This report summarises the outcome from Education Scotland HMIE inspection in
November 2024 for Mosstowie Primary School.  The school was subject to a full
inspection model visit where gradings of Good (1), Satisfactory (2) and Weak (1) were
achieved across the four core Quality Indicators forming the basis for inspection.  As a
result of inspection findings and identified Weak grading for QI 1.3 (Leadership of
Change), Education Scotland HMIE indicated through letter published in March 2025
that the school needs additional support and more time to make necessary
improvements.   
A School Improvement Action plan has been drafted, in discussion with the Acting Head
Teacher, positively commended for her pro-active and collegiate approach to school
improvement.  This action plan will now support the substantive Head Teacher to drive
forward improvements required on their return, with ongoing support and scrutiny from
the central Quality Improvement team under direction of the Quality Improvement
Manager.  Education Scotland have intimated their intention to return to carry out a
further inspection of the school within one year of the publication of the inspection letter
(revisit anticipated around March 2026).   
3.  RECOMMENDATIONS
Item 17.*
Page 251

Page 252

3.1  It is recommended that Committee:   
i)  scrutinise and note the contents of this report and findings of
Education Scotland HMIE following their inspection visit;   
ii)  note that an action plan is in place in order to address areas for
improvement requiring further attention, with particular focus on
leadership of change;   
iii)  note that support will continue from the Quality Improvement team in
order to realise further improvements required following change in
school leadership; and   
iv)  note that following future revisit from Education Scotland HMIE
(anticipated around March 2026), a further paper will then be brought
to Education, Children’s and Leisure Services Committee in order to
provide update on school progress with improvements.   
Stewart McLauchlan
Quality Improvement Manager 
4.  BACKGROUND AND CONTEXT  
4.1  When Education Scotland HMIE inspects a school, a report is published which gives
commentary on the school’s performance.  These reports are presented regularly to
Committee, where possible at the first available opportunity after publication. 
4.2  In November 2024, a team of inspectors from Education Scotland HMIE visited
Mosstowie Primary School.  During their visit, inspectors talked to parents/carers and
children and worked closely with the Acting Head Teacher and staff.    
4.3  Mosstowie Primary School was subject to a full inspection model visit spanning over
five days in total.  
4.4  The Education Scotland Inspection team use selected Quality Indicators (QIs)
from How good is our school? 4th edition (HGIOS4), rated using the six-point
scale.    
4.5  Education Scotland HMIE focus QIs for the Primary school (full inspection model) are: 
QI 1.3 Leadership of change 
QI 2.3 Learning, teaching and assessment 
QI 3.1 Ensuring wellbeing, equality and inclusion 
QI 3.2 Raising attainment and achievement 
4.6  Full establishment inspections also include focus on Safeguarding and themes from
other QIs to ensure Inspectors continue to capture the evidence needed to promote
improvement and provide evidence to inform national policy development. These are
not assigned a rating and are: 
QI 2.2 Curriculum  (Learning Pathways theme) 
QI 2.7 Partnerships  (Partnerships in evaluating the impact of parental engagement) 
Page 252

Page 253

4.7  Following further dialogue between Education Scotland HMIE and the local authority,
Education Scotland published Mosstowie Primary School’s Inspection Report on 4
March 2025 with the following gradings: 
QI 1.3 Leadership of change Weak
QI 2.3 Learning, teaching and assessment Satisfactory
QI 3.1 Ensuring wellbeing, equality and inclusion Good
QI 3.2 Raising attainment and achievement Satisfactory 
4.8  The inspection team found the following strengths in the school’s work: 
• The confident, well behaved and happy children who are proud of their school.
Children exemplify the school values in all of their interactions with staff, visitors and
each other.
• The supportive and respectful relationships within the whole school community
which promote a strong ethos of wellbeing. Staff, parents and children support each
other very well and create a positive and nurturing learning environment for all.
• The pro-active and collegiate approach to school improvement taken by the acting
headteacher. The school community are highly supportive of new measures initiated
by the acting headteacher during her short time in post. Staff demonstrate a strong
commitment to working collaboratively to ensure improved outcomes for all children.  
4.9  The inspection team agreed the following areas for improvement with the Acting Head
Teacher and Moray Education: 
• The acting headteacher has introduced several new and important approaches to
school improvement in a short period. These developments are very recent and
there has been insufficient time to demonstrate the overall impact of this work. The
local authority need to support the school to ensure that planned improvements are
implemented, effective and sustained over time.
• The acting headteacher and all staff, with the support of the local authority, need to
improve approaches to evaluating the work of the school. Their self-evaluation must
be robust and based on high-quality evidence.
• The acting headteacher and all staff, with the support of the local authority, need to
ensure the overall quality of learning and teaching is consistently high across the
whole school. This will help to support all children to make the best possible
progress in their learning and raise attainment.  
4.10  The Education Scotland HMIE inspection report and summary of inspection findings for
the school can be viewed at: 
Inspection Report
Summarised Inspection Findings
Additional Inspection Evidence  
4.11  Following inspection, Education Scotland HMIE have advised that they feel that the
school needs additional support and more time to make necessary improvements.  As
a result, Education Scotland HMIE have intimated that a further inspection of the
school will be carried out within 12 months of the publication date of inspection letter
(further inspection anticipated in March 2026).    
4.12  Following inspection, the Acting Head Teacher was further supported by the Quality
Improvement team.  An action plan in order to address key areas for improvement has
been developed with further discussion taking place with the substantive Head Teacher. 
Actions identified for focus link to leadership of change, self-evaluation and school
Page 253

Page 254

improvement as well as ensuring consistency in high quality learning and teaching
experiences across the school.    
4.13  In further recognition of the positive aspects of this inspection and next steps now
required, a Press Release was published on 4 March 2025 (day of Education Scotland
HMIE report publication) to recognise the strengths recognised by the inspection team
as well as actions underway in order to address areas for improvement identified.  
4.14  For reference, the Education Scotland HMIE visit report published in March 2025
following visit in November 2024 is contained within Appendix 1. 
5.  PROPOSALS  
5.1  It is proposed that the Committee scrutinise and note the contents of this report,
following full inspection model visit by Education Scotland HMIE as outlined above, to
Mosstowie Primary School.  It is further proposed that Committee note that a School
Improvement Action Plan has been drafted, supported by the central Quality
Improvement Team in order to guide the substantive Head Teacher in leading
improvements required.  Further inspection by HMIE is anticipated around March 2026
and reporting to committee will result as soon as possible thereafter.  School support
and challenge activities will continue as part of the Moray Quality Improvement
Framework in order to realise improvements required.        
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations
are agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement
Plan)
 
Policy and Legal  
Financial  
Risk  
Staffing  
Best Value and Transformation  
Property  
Information Communications Technology/Digital  
Equalities. Social Inclusion and Economic Impact   
Climate Change and Biodiversity Impact   
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following
Council Plan strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Page 254

Page 255

local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population   
6.3  Policy and Legal 
HM Inspectors’ powers to inspect educational establishments and services are set out
in legislation and referred to within section 135(1) of the Education (Scotland) Act 1980. 
HM Inspectors (HMIs) have statutory functions of inspection conferred on them by Part
III of the 1980 Act.  Responsibility for the quality of education delivery rests with the
relevant local authority, as defined in section 1 (1) of the Education (Scotland) Act 1980
and further detailed within the Standards in Scotland’s Schools etc. Act 2000. 
6.4  Financial 
There are no financial implications arising directly from this report. 
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend
this Year
Virement
From
Other
Comments
- - - - - - 
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments
- - - - - - 
6.5  Risk 
There are no risk implications arising directly from this report.  
6.6  Staffing 
There are no staffing implications arising directly from this report.  
6.7  Best Value and Transformation 
There are no Best Value and Transformation implications where this report is to inform
Committee on school performance following external scrutiny/validation activity.  
6.8  Property 
There are no property implications arising directly from this report.  
6.9  Information Communications/Technology/Digital 
There are no Information Communications/Technology/Digital implications arising
directly from this report.  
6.10  Equalities, Social Inclusion and Economic Impact 
An Equality/Socio Economic Impact Assessment is not required as this report is to
inform Committee on school performance following external scrutiny/validation activity. 
It is worthwhile noting that the Inspection Report QI 3.1 Ensuring wellbeing, equality
and inclusion rated as ‘Good’ which assists in evidencing the Council’s compliance with
the public sector equality duty to promote equality of opportunity and foster good
Page 255

Page 256

relations.
6.11 Climate Change and Biodiversity Impacts
No climate change or biodiversity implications have been determined due to the
scrutiny based nature of activities reported and no findings related to such implications
contained herein.    
7. CONSULTATION
7.1  This report has been prepared in consultation with the Head of Education (Chief
Education Officer), Equal Opportunities Officer, Human Resources Manager, Caroline
O’Connor, Committee Services Officer, Senior Officers in Education and the Acting
Head Teacher of Mosstowie Primary School and any comments made have been
incorporated into the report.
8. BACKGROUND PAPERS
8.1  Inspection Report
Summarised Inspection Findings
Additional Inspection Evidence
Press Release
How good is our school? 4th edition
Education Scotland six-point scale
Page 256

Page 257

1   |   Mosstowie Primary School, Moray Council, 5202426 © Crown Copyright
4 March 2025
Dear Parent/Carer
In November 2024, a team of inspectors from Education Scotland visited Mosstowie Primary
School. During our visit, we talked to parents/carers and children and worked closely with the
acting headteacher and staff.
The inspection team found the following strengths in the school’s work.
• The confident, well behaved and happy children who are proud of their school. Children
exemplify the school values in all of their interactions with staff, visitors and each other.
• The supportive and respectful relationships within the whole school community which
promote a strong ethos of wellbeing. Staff, parents and children support each other very
well and create a positive and nurturing learning environment for all.
• The pro-active and collegiate approach to school improvement taken by the acting
headteacher. The school community are highly supportive of new measures initiated by
the acting headteacher during her short time in post. Staff demonstrate a strong
commitment to working collaboratively to ensure improved outcomes for all children.
The following areas for improvement were identified and discussed with the acting
headteacher and representatives from Moray Council.
• The acting headteacher has introduced several new and important approaches to school
improvement in a short period. These developments are very recent and there has been
insufficient time to demonstrate the overall impact of this work. The local authority need to
support the school to ensure that planned improvements are implemented, effective and
sustained over time.
• The acting headteacher and all staff, with the support of the local authority, need to
improve approaches to evaluating the work of the school. Their self-evaluation must be
robust and based on high-quality evidence.
• The acting headteacher and all staff, with the support of the local authority, need to
ensure the overall quality of learning and teaching is consistently high across the whole
school. This will help to support all children to make the best possible progress in their
learning and raise attainment.
APPENDIX 1
Page 257

Page 258

2   |   Mosstowie Primary School, Moray Council, 5202426 © Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using four quality indicators
from How good is our school? (4th edition). Quality indicators help schools, local authorities
and inspectors to judge what is working well and what needs to be improved. Following the
inspection of each school, the Scottish Government gathers details of our evaluations to keep
track of how well Scottish schools are doing. 
Here are Education Scotland’s evaluations for Mosstowie Primary
School 
Quality indicators Evaluation
Leadership of change  weak
Learning, teaching and assessment satisfactory
Ensuring wellbeing, equality and inclusion good
Raising attainment and achievement satisfactory
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on
the Education Scotland website at:  Details | Find an inspection report | Find an inspection
report | Inspection and review | Education Scotland 
What happens next? 
As a result of our inspection findings, we think that the school needs additional support and
more time to make necessary improvements. We will liaise with Moray Council regarding the
school’s capacity to improve. We will return to carry out a further inspection of the school
within one year of the publication of this letter. We will discuss with Moray Council the details
of this inspection and their arrangements for ongoing support for the school. When we return
to inspect the school, we will write to you as parents/carers informing you of the progress the
school has made. 
M. A. Speirs
HM Inspector 
Page 258

Page 259

Report to: Education, Children’s
and Leisure Services
Committee 
Meeting Date: 13 May 2025  
Report by: Depute Chief Executive
(Education, Communities
and Organisational
Development) 
Report No: EDU016/25/SMcL/AMB  
Author: Stewart McLauchlan Contact
Email:
education@moray.gov.uk 
Subject: Education Scotland Further Inspection (Continuing Engagement) of
Lhanbryde Primary School 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to inform the Committee of the outcomes of a recently
published report on a Moray school following inspection by Education Scotland’s His
Majesty’s Inspectors of Education (HMIE).  
1.2  This report is submitted to Committee in terms of Section III (D) (1) of the Council’s
Scheme of Administration relating to all the functions of the Council as an Education
Authority. 
2.  SUMMARY  
2.1  This report summarises the positive outcome from further inspection visit by Education
Scotland HMIE to Lhanbryde Primary School.  The school was initially subject to a full
inspection model visit in November 2023 where gradings of Good (1), Satisfactory (2)
and Weak (1) were achieved across the four core Quality Indicators forming the basis
for inspection.  As a result of inspection findings and identified Weak grading for QI 3.2
(Raising Attainment and Achievement), Education Scotland HMIE indicated through
letter published in May 2023 that the school needed additional support and more time
to make necessary improvements.  A clear action plan was put in place in order to
address areas for improvement and the school was provided with additional resource
and support from the Quality Improvement Team.   
Following this further inspection visit in October 2024 and publication of report in
February 2025, Education Scotland HMIE have indicated that the school has made
good progress since the original inspection and are confident that the school has the
capacity to continue to improve.  As a result, Education Scotland HMIE will make no
more visits in connection with this inspection. 
3.  RECOMMENDATIONS
Item 18.*
Page 259

Page 260

3.1  It is recommended that Committee:   
i)  scrutinise and note the contents of this report and findings of Education
Scotland HMIE following their further inspection visit;   
ii)  note that the school followed a clear action plan and initiated further
changes supported by central Quality Improvement colleagues, realising
improvements required in order to achieve this positive further
inspection outcome; and   
iii)  note that support for the school will continue as part of our Moray
Quality Improvement Framework activities and school visit programme.   
Stewart McLauchlan
Quality Improvement Manager 
4.  BACKGROUND AND CONTEXT  
4.1  When a school is inspected by Education Scotland HMIE, a report is published which
gives commentary on the school’s performance.  These reports are presented regularly
to Committee, where possible at the first available opportunity after publication. 
4.2  In May 2023, a team of inspectors from Education Scotland HMIE visited Lhanbryde
Primary School.  During their visit, inspectors talked to parents/carers and children and
worked closely with the Head Teacher and staff.    
4.3  Lhanbryde Primary School was subject to a full model inspection visit at that time,
spanning over five days in total.  
4.4  The Education Scotland Inspection team use selected Quality Indicators (QIs)
from How good is our school? 4th edition (HGIOS4), rated using the six-point
scale.    
4.5  Education Scotland HMIE focus QIs for the Primary school (full inspection model) are: 
QI 1.3 Leadership of change 
QI 2.3 Learning, teaching and assessment 
QI 3.1 Ensuring wellbeing, equality and inclusion 
QI 3.2 Raising attainment and achievement 
4.6  Full establishment inspections also include focus on Safeguarding and themes from
other QIs to ensure Inspectors continue to capture the evidence needed to promote
improvement and provide evidence to inform national policy development. These are
not assigned a rating and are: 
QI 2.2 Curriculum  (Learning Pathways theme) 
QI 2.7 Partnerships  (Partnerships in evaluating the impact of parental engagement)  
4.7  Following further dialogue between Education Scotland HMIE and the local authority,
Education Scotland published Lhanbryde Primary School’s Inspection Report on 21
November 2023 with the following gradings: 
QI 1.3 Leadership of change Satisfactory
QI 2.3 Learning, teaching and assessment Good
Page 260

Page 261

QI 3.1 Ensuring wellbeing, equality and inclusion Satisfactory
QI 3.2 Raising attainment and achievement Weak 
4.8  The inspection team found the following strengths in the school’s work: 
• Children who are welcoming, respectful, kind and caring. Positive, trusting
relationships across the school community support children to feel a strong sense of
belonging.
• A collaborative staff team who consider carefully the strengths and needs of
children in their classes. This is leading to improvements in classroom practice and
the learning experiences of children.
• The range and quality of support offered to children who face challenges and
barriers to their learning. Staff carefully plan together a range of interventions to
meet the needs of individual children.  
4.9  The inspection team agreed the following areas for improvement with the Head
Teacher and Moray Education: 
• Senior leaders should ensure that children receive their entitlement to a broad
general education. Delivering learning across all curricular areas will provide greater
opportunities for children to develop important skills.
• Senior leaders and staff should work together to improve the progress and
attainment of all children.
• Ensure that all children have equitable opportunities to participate in wider
achievement activities which are systematically tracked and monitored.  
4.10  As a result of inspection findings, HMIE liaised with Moray Education where it was
thought that the school needed additional support and more time to make necessary
improvements.  As a result, Education Scotland HMIE intimated that further inspection
would be carried out within 12 months of publication of inspection letter.  This was
initiated as a result of the grading received for QI 3.2 as noted above.  
4.11  Following inspection, the Head Teacher and Depute Head Teacher were supported by
the Quality Improvement Officer linked to the school and the Primary Advisor (Quality
Improvement) to devise an action plan in order to address key areas for improvement. 
Actions identified were focussed upon raising attainment and achievement, and
ensuring equity for all pupils in terms of support and participation in school.  Change in
school leadership also followed during this time, with appointment of the substantive
Depute Head Teacher as Acting Head Teacher following the substantive Head
Teacher’s retiral.  An Acting Depute Head Teacher was also appointed in order to
complete the Senior Leadership Team and drive forward school improvement.  
4.12  Regular reporting to the Quality Improvement Manager followed and through quality
improvement visits led by the Primary Advisor and Quality Improvement Officer, key
improvements were realised.  In particular, improvements related to curriculum
development and progression pathways across the curriculum, increased rigour in
tracking and monitoring of pupil progress in learning and their attainment as well as
ensuring equity for all pupils through participation in clubs, activities and wider
achievements (including tracking of these for wider skills development).  
4.13  In October 2024, HM Inspectors returned to carry out a further inspection of Lhanbryde
Primary School in order to look at particular areas for improvement that had been
identified in the original inspection in November 2023.  Once again, HM Inspectors
talked to children, worked closely with the Acting Head Teacher and staff, visited
lessons and heard from key stakeholders about the steps the school had taken to
Page 261

Page 262

improve.  As a result, HM Inspectors were able to find out about the progress the
school had made.  
4.14  With regard to the improvement areas identified from the original inspection in
November 2023, the following summary comments are noted: 
Area for improvement: Summary comment:
Senior leaders should ensure that
children receive their entitlement to a
broad general education. Delivering
learning across all curricular areas will
provide greater opportunities for children
to develop important skills.
There has been significant improvement
in this area for development since the
initial inspection.
Senior leaders and staff should work
together to improve the progress and
attainment of all children.
The progress and attainment of children
has improved.
Ensure that all children have equitable
opportunities to participate in wider
achievement activities which are
systematically tracked and monitored.
There has been significant improvement
in this area since the initial inspection. 
4.15  Education Scotland HMIE identified that the school has made good progress since the
original inspection and are confident that the school has the capacity to continue to
improve.  As a result, no further visits will be made by HM Inspectors in relation to this
inspection. 
4.16  As a local authority, the Council will continue to inform key stakeholders including
parents/carers on the school’s progress through normal arrangements on reporting on
quality of schools, guiding school improvement through our Moray Quality Improvement
Framework.  
4.17  In further recognition of this positive inspection outcome, a Press Release was
published on 19 February 2025 to recognise the strengths recognised by the inspection
team as well as actions underway to address areas for improvement identified.  
4.18  For reference, the Education Scotland HMIE visit report published in February 2025
following visit in October 2024 is contained within Appendix 1. 
5.  PROPOSALS  
5.1  It is proposed that the Committee scrutinise and note the contents of this report,
following the positive further inspection visit by HM Inspectors as outlined above, to
Lhanbryde Primary School in October 2024.  Further inspection was initiated by HM
Inspectors following outcome of a full model inspection in November 2023.  This report
completes Committee reporting for Lhanbryde Primary School in relation to this
inspection, where areas for improvement have been addressed.  
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations
are agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement
Plan)
 
Page 262

Page 263

Policy and Legal  
Financial  
Risk  
Staffing  
Best Value and Transformation  
Property  
Information Communications Technology/Digital  
Equalities. Social Inclusion and Economic Impact   
Climate Change and Biodiversity Impact   
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following
Council Plan strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population   
6.3  Policy and Legal 
HM Inspectors’ powers to inspect educational establishments and services are set out
in legislation and referred to within section 135(1) of the Education (Scotland) Act 1980. 
HM Inspectors (HMIs) have statutory functions of inspection conferred on them by Part
III of the 1980 Act.  Responsibility for the quality of education delivery rests with the
relevant local authority, as defined in section 1 (1) of the Education (Scotland) Act 1980
and further detailed within the Standards in Scotland’s Schools etc. Act 2000. 
6.4  Financial 
There are no financial implications arising directly from this report. 
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend
this Year
Virement
From
Other
Comments
- - - - - - 
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments
Page 263

Page 264

- - - - - - 
6.5  Risk 
There are no risk implications arising directly from this report.  
6.6  Staffing 
There are no staffing implications arising directly from this report.  
6.7  Best Value and Transformation 
There are no Best Value and Transformation implications where this report is to inform
Committee on school performance following external scrutiny/validation activity.  
6.8  Property 
There are no property implications arising directly from this report.  
6.9  Information Communications/Technology/Digital 
There are no Information Communications/Technology/Digital implications arising
directly from this report.  
6.10  Equalities, Social Inclusion and Economic Impact 
An Equality/Socio Economic Impact Assessment is not required as this report is to
inform Committee on school performance following external scrutiny/validation activity.  
6.11  Climate Change and Biodiversity Impacts 
No climate change or biodiversity implications have been determined due to the
scrutiny based nature of activities reported and no findings related to such implications
contained herein.     
7.  CONSULTATION  
7.1  This report has been prepared in consultation with the Head of Education (Chief
Education Officer), Equal Opportunities Officer, Human Resources Manager, Caroline
O’Connor, Committee Services Officer, Senior Officers in Education and the Acting
Head Teacher of Lhanbryde Primary School and any comments made have been
incorporated into the report. 
8.  BACKGROUND PAPERS  
8.1  Inspection Report
Summarised Inspection Findings
Additional Inspection Evidence
Press Release
How good is our school? 4th edition
Education Scotland six-point scale   
Page 264

Page 265

1   |   Lhanbryde Primary School, Moray Council, 5201926 © Crown Copyright
18 February 2025
Dear Parent/Carer
In November 2023, HM Inspectors published a letter on Lhanbryde Primary School. The
letter set out a number of areas for improvement which we agreed with the school and Moray
Council. Recently, as you may know, we visited the school again. During our visit, we talked
to children and worked closely with the acting headteacher and staff. We heard from the
acting headteacher and other staff about the steps the school has taken to improve. We
looked at particular areas that had been identified in the original inspection. As a result, we
were able to find out about the progress the school has made and how well this is supporting
children’s learning and achievements. This letter sets out what we found.
The following areas for improvement were identified during the initial inspection and
discussed with the acting headteacher and a representative from Moray Council.
Senior leaders should ensure that children receive their entitlement to a broad
general education. Delivering learning across all curricular areas will provide
greater opportunities for children to develop important skills.
There has been significant improvement in this area for development since the initial
inspection.
Senior leaders worked closely with staff, children and partners to develop a curriculum
rationale which is relevant to the context of the school. The overall curriculum offer has been
extended to ensure that all children experience a broad general education.
Teachers now plan learning using Curriculum for Excellence learning pathways more
effectively across all curriculum areas. Teachers encourage children to discuss and decide
on areas they would like to learn about as well as how they would like to learn. This is
enabling all children to develop a wider range of skills and to experience learning in a range
of relevant contexts.
Staff have introduced German as a second modern language in the upper primary and
continue to deliver French across the school. Scots’ language learning also features as part
of children’s learning at relevant points in the school year.
Children benefit from, and enjoy, learning outdoors in the school grounds and have engaged
meaningfully in maths learning in this environment. Staff should develop further outdoor
learning across all stages, embedded in teacher planning to support the delivery of the broad
general education. This will support children’s learning and skills development.
The health and wellbeing curriculum is now more embedded in teacher planning and in the
experiences of all children. Improved approaches focus on leading a healthy lifestyle. For
example, children have engaged in cooking and eating healthy foods and understanding the
health benefits of this on the body.
APPENDIX 1
Page 265

Page 266

2   |   Lhanbryde Primary School, Moray Council, 5201826 © Crown Copyright
Senior leaders and staff should continue to improve the curriculum to ensure that all eight
curricular areas are delivered with appropriate balance across the timetable. In consultation
with children and staff, a renewed focus on science, technology, engineering and maths
(STEM) is being planned. A bespoke environment is currently being developed to support
this important next step in curricular development. 
All staff should continue to encourage and support children to celebrate their work across the
curriculum through showcase events and regular communications with home. Children are
developing well, their skills in organising, planning and preparing for these popular events,
including as part of health week and the Harvest Café. 
Senior leaders and staff should work together to improve the progress and attainment
of all children. 
The progress and attainment of children has improved. 
Children’s attainment over time has improved since the initial inspection. There has been an
improvement in attainment as children progress from P1 to P4 in reading and listening and
talking. There has been an improvement in attainment as children progress from P4 to P7 in
reading, writing and numeracy and mathematics. 
All staff have created a nurturing, inclusive environment in which children learn. Almost all
children behave well and engage effectively in learning. This is helping to improve children’s
progress and attainment. 
Teachers make effective use of a range of assessments to help them make accurate
judgements about children’s progress and attainment. Senior leaders and teachers use this
data effectively to identify children who may require additional support. The frequency of
progress and attainment meetings has been increased to more effectively monitor children’s
progress and attainment. Teachers provide a range of supports to help children to close gaps
in their learning. Almost all children who receive targeted interventions are making good
progress with their individual targets. A few children need more challenge in their learning.
Increased challenge is supporting staff well to raise the attainment of all children further.
Senior leaders should now develop further their use of data to help them to accelerate
progress towards closing gaps between groups of children. This includes gaps in attainment
for children facing financial hardship. 
Senior leaders correctly identified the need to improve attainment further in writing and in
numeracy and mathematics. All teachers have worked together well to develop how they plan
and deliver learning in these areas. They have introduced a new annual overview and
developed a bank of learning activities for numeracy and mathematics. They have also
revised the allocation of support staff to better support writing activities. All staff should
continue to consider carefully how they embed literacy, numeracy and health and wellbeing
across all curricular areas. Senior leaders should continue to monitor the progress of all
children in these areas and review and revise approaches to raising attainment as
appropriate. 
Page 266

Page 267

3   |   Lhanbryde Primary School, Moray Council, 5201826 © Crown Copyright
Ensure that all children have equitable opportunities to participate in wider
achievement activities which are systematically tracked and monitored. 
There has been significant improvement in this area since the initial inspection. 
Children’s achievements are now tracked successfully by their teachers. This enables senior
leaders and staff to recognise children’s achievements and celebrate their accomplishments. 
Children shared information about clubs and activities they participate in, both within and
outwith the school day through an online survey. 
Staff know their children well and are aware of who may be at risk of non-participation in
wider achievement activity. Staff regularly support children to participate in the most
appropriate available activities. Children’s achievements are celebrated in assemblies,
through certificates such as ‘Star Reader’ and ‘Phenomenal Friday’ and on the school’s
achievements display board. These are valued by children and help develop well their sense
of ambition and aspiration to achieve. 
Children now experience choice in the range and quantity of opportunities to participate in
learning outwith the classroom. Staff have extended their work with key partners, including
those from the local community, to enhance children’s learning and skills development.
Partners provide activities such as multi sports, knitting, football, boccia and cricket. These
opportunities are developing well important skills, including communication, problem solving
and teamwork. School staff also offer a range of opportunities for children to participate in
clubs and activities, including choir, art club and reading club. 
Teachers and children use ‘Bee our Best’ hives in every class to enable children and staff to
recognise achievements visually. These are used well to recognise how children’s
achievements are linked to the Curriculum for Excellence four capacities. Class teachers
discuss these regularly with children individually. Teachers now need to develop a more
consistent approach to these one-to-one discussions about achievements. This would
support children further to recognise the importance of their achievements and the skills they
are developing as a result of their participation. 
Participating in, and learning from, these opportunities for wider achievements is impacting
positively on children’s experiences in school and on the development of key skills. Staff
report that these improvements are impacting on the school ethos. Children’s ambition in
striving to achieve well, both within the classroom and beyond the school day, is increasing. 
Staff should continue to develop this area of work and extend further its use of partners, both
locally and nationally. Senior leaders and staff should now track the skills children are
developing through these wider achievement activities. Effective use of their skills framework
and whole school tracking system should support them to do this. 
Page 267

Page 268

4   |   Lhanbryde Primary School, Moray Council, 5201826 © Crown Copyright
What happens next? 
The school has made good progress since the original inspection. We are confident that the
school has the capacity to continue to improve and so we will make no more visits in
connection with this inspection. Moray Council will inform parents about the school’s progress
as part of its arrangements for reporting on the quality of its schools. 
Teri McIntosh
HM Inspector
Page 268

Page 269

Report to: Education, Children’s and
Leisure Services
Committee 
Meeting Date: 13 May 2025  
Report by: Depute Chief Executive
(Education, Communities
and Organisational
Development) 
Report No: EDU008/25/SMcL/AMB  
Author: Stewart McLauchlan Contact Email: education@moray.gov.uk 
Subject: Analysis of Secondary School Leaver Attainment 2023-2024 
1.  PURPOSE 
☒ For Decision      ☐ For Information 
1.1  The purpose of this report is to inform the Committee of the Scottish Qualifications
Authority (SQA) 2024 leaver attainment across secondary schools in Moray and for this
data to be scrutinised and noted as part of the Council’s focus on improving outcomes
and raising attainment.  This is an update to the Initial Attainment Report for Secondary
Schools 2024 previously presented to Committee on 26 November 2024, with leavers’
update now presented to Committee at the first opportunity following data release in
February 2025, including initial positive destination data.    
1.2  This report is submitted to Committee in terms of Section III (D) (1) of the Council’s
Scheme of Administration relating to all the functions of the Council as an Education
Authority. 
2.  SUMMARY  
2.1  This report provides analysis of secondary school leaver attainment for session 2023/2024
following release of leaver destination data and updated leaver attainment following data
release in February 2025.  This paper provides overview of Moray Secondary School
Performance across four key measures – (1) Improving Attainment in Literacy and
Numeracy, (2) Improving Attainment for All (3) Increasing post-school destinations and (4)
tackling disadvantage by improving the attainment of lower attainers relative to high
attainers.  A further measure (5) breadth and depth of leaver qualifications is also
considered.  Overall, Moray continues to perform well in respect of measure (1), (2) and (4)
against the Virtual Comparator (VC).  Positive destinations (3) have reduced marginally,
also noting more young people entering employment this session as opposed to Further
Item 19.*
Page 269

Page 270

and Higher Education (comparable to session 2024).  In relation to measure (5),
performance at Scottish Credit and Qualifications Framework (SCQF) level 5 remains
positive against the VC, with improvements noted for further action at SCQF level 6. 
Overall, improvements in performance are required against National measures as noted
within the report as well as external factors impacting on raising attainment as noted in
section 6, including staffing sufficiency, social and technological issues.  
3.  RECOMMENDATIONS  
3.1  It is recommended that Committee:   
i)  scrutinise and note the Senior Phase Leaver Attainment across our
Secondary Schools in Moray for session 2023/2024 with specific regard to the
National Measures for leavers published on Insight in February 2025; 
ii)  acknowledge identified improvements in performance evidenced through
key measures outlined within this paper; and   
iii)  further note identified actions for improvement arising from 2023/2024
attainment and performance as outlined in initial analysis of secondary
school attainment paper previously presented to this Committee on 26
November 2024 (para 18 of minute refers).   
Stewart McLauchlan
Quality Improvement Manager 
4.  BACKGROUND AND CONTEXT  
4.1  This report provides update in relation to Insight data we receive each year for cohort
attainment across S4, S5 and S6 for our school leavers across four key national
benchmarking measures: 
• Improving attainment in Literacy and Numeracy
• Improving attainment for all
• Increasing post-school destinations
• Tackling disadvantage by improving the attainment of lower attainers relative to high
attainers  
4.2  Insight encourages Education to take a comprehensive approach to evaluating attainment
and achievement that takes into account the performance within Moray across all four
measures in 4.1 above.  Education also use their breadth and depth of SCQF level
qualifications for leavers as a measure against Morays virtual comparator.  
4.3  As part of the Moray Quality Improvement Framework (MQIF), the Quality Improvement
Team continue to undertake support and challenge meetings, discussions and visits in
relation to school attainment and performance.  This also takes place collectively through
Secondary Head Teacher meetings, at school level with in-person visits to schools and
through the team’s refreshed school visit programme and triaged extended school visit
schedule in line with MQIF and anticipated inspection timelines.    
Page 270

Page 271

4.4  Caution remains with data trends over time whereby this year represents year three of a
return to a formal examination diet following on from two very different years of Alternative
Certification Models (ACMs) in 2020 and 2021 with Covid-19 impacting on young people
and Moray’s school communities.  Schools continue to support young people as a result
of the legacy of the pandemic, with secondary schools reporting higher levels of absence,
concerns in relation to behaviours exhibited by some young people, mental health and
wellbeing concerns and further increase in Additional Assessment Arrangements (AAA) for
examinations.    
4.5  As additional context, S4 pupils would have commenced secondary school at start of
session 2020/2021 (August 2020) with significant disruption to the end of their Primary
schooling and more limited transition activities in place due to Covid-19 mitigations in
place at that time. AAA requirements continue to impact on some secondary schools in
terms of acute accommodation pressures when running SQA Examinations in April/May
2024. 
4.6  Secondary schools continue to offer a wide range of wellbeing, learning and supported
study opportunities.  Further signposting to national e-learning opportunities offered
through e-Sgoil and Scholar are also made by Moray schools in support of young people as
well as wider interventions including mentoring and targeted learning conversations/target
setting.  A number of secondary schools have also purchased the online learning platform,
Achieve, containing online digital courses, resources, online assessments and support
with SQA examinations.  
4.7  Within this Committee report, data from 2019/20 and 2020/21 (ACM years – no formal
examinations) is contained alongside data from session 2021/22, 2022/23 and 2023/24
also presented in order to outline progress and trends over time as well as direct actions
for improvement.  As reported previously to Committee, very different assessment
processes and operating environments compared to previous sessions when arriving at
final grades have been present across 2019/20 and 2020/21 (Covid-19 ACM) and indeed,
over session 2021/22 and 2022/2023. Session 2023/24 witnessed reintroduction of fuller
assessment requirements including return of coursework for most National
Qualifications.  As a result, this may make year on year comparisons unequal across the
five-year trend period presented due to different assessment environments.  
4.8  Contextual information relating to the examinations in place for session 2021/2022 has
been provided in the Initial Analysis of Secondary School Attainment:  Session 2023-2024
Committee Paper presented for scrutiny and noting to this Committee on 26 November
2024.  
4.9  This report completes the attainment picture for session 2023/24 where leaver destination
data is not available until December of each year, information appearing on Insight in
February 2025.  This report is presented to Committee at the first available opportunity
following data release.  For session 2023/24 there were 994 leavers in total compared with
971 in 2022/2023.  Stage contribution to the 2023/2024 leaver population was as follows: 
Stage
2023/24
Leavers
S4 203
S5 350
Page 271

Page 272

S6 441
Total 994
Session 2022/23:  S4 |183; S5 | 321; S6 |467; Total Leavers | 971)  
4.10  Subsequent sections will now consider Senior Phase Attainment for session 2023/2024 as
well as trend over time, outlining performance overall of Moray Secondary Schools in
relation to key benchmarking measures outlined in 4.1 above as well as change in
performance noted over time.    
4.11  Moray performance, where indicated in green, highlights where performance exceeds
virtual or national comparators; amber indicates where performance is marginally below
and red highlight as notably below national average where appropriate.  Where applied,
yellow highlight signifies data of specific interest due to changing trend over time.  
4.12  IMPROVING ATTAINMENT IN LITERACY AND NUMERACY
This measure presents the percentage of leavers achieving an award in Literacy and
Numeracy at Scottish Credit and Qualifications Framework (SCQF) Levels 4 and 5 by the
end of their school experience in Moray, compared with pupils with identified similar
characteristics across Scotland (VC - Virtual Comparator) for each of the last five years. 
This is shown in graph form below for Moray (all leavers, percentage attaining Literacy and
Numeracy at SCQF level 4 and 5). 
4.13  Percentage of School Leavers (S4-S6) attaining Literacy at SCQF Level 4 and Level 5 
Measure Commentary on performance
Literacy SCQF level 4
Literacy at SCQF level 4 for Moray’s leavers (93.06%) remains
above the VC (92.39%).  A slight narrowing of the positive
attainment gap year on year is noted, as well as marginal
reduction in both Moray and VC.
Literacy SCQF level 5
Literacy at SCQF level 5 for Moray’s leavers (80.18%) remains
above the VC (79.01%).  A slight narrowing of the positive
attainment gap is noted, as well as marginal reduction in both
Moray and VC. 
Page 272

Page 273

4.14  Percentage of School Leavers (S4-S6) attaining Numeracy at SCQF Level 4 and Level 5 
Measure Commentary on performance
Numeracy SCQF level 4
Numeracy at SCQF level 4 for Moray’s leavers (89.74%)
remains above the VC (89.62%).  A narrowing of the positive
attainment gap year on year is noted from 2021, as well as
marginal reduction in Moray and VC.
Numeracy SCQF level 5
Numeracy at SCQF level 5 for Moray’s leavers (71.13%)
remains above the VC (68.95%).  A slight narrowing of the
positive attainment gap is noted compared with 2023. 
4.15  Five-year trend analysis:  Moray performance at SCQF level 4 and 5 against VC 
Literacy &
Numeracy Year
% Level 4
Literacy
% Level 4
Numeracy
% Level 5
Literacy
% Level 5
Numeracy
Moray 2024 93.06 89.74 80.18 71.13
VC  2024 92.39 89.62 79.01 68.95
Moray 2023 94.85 91.04 81.36 72.50
VC  2023 93.10 90.18 79.35 68.03
Moray 2022 95.53 93.87 84.32 70.09
VC 2022 94.27 91.25 81.10 69.41
Moray 2021 95.90 93.29 83.39 70.53
VC 2021 94.52 91.57 82.01 70.93
Moray 2020 92.95 88.53 80.88 64.16
VC 2020 93.95 91.62 80.44 69.63 
Overall, Moray has performed positively and above the Virtual Comparator for leaver
attainment for Literacy and Numeracy at SCQF level 4 and level 5.  This year is the third
year in a five year trend that performance has exceeded the Virtual Comparator across all
four measures reported above.   
4.16  IMPROVING ATTAINMENT FOR ALL
This measure allows us to examine how different ability cohorts are attaining in relation to
the appropriate virtual and national cohorts.  Attainment is measured using the tariff
scale, which was developed for Insight.  This allocates a specific number of points to each
Page 273

Page 274

qualification (including non-examination, unit-based courses).  More demanding
qualifications gain more points than less demanding ones and in graded courses, a grade
‘A’ is equivalent to more points than a grade ‘C’ for example, within the same course.  
4.17  Three ability cohorts are identified for each school, the VC, the Northern Alliance (Regional
Improvement Collaborative) and Scotland as a whole (The National Establishment):  those
in the lowest 20% of tariff points achieved, those in the highest 20% and those that fall
within the middle 60% of tariff points achieved based on the courses they have undertaken
and completed.  Graded course performance (where grades A-C are achieved – for
example, through National Qualifications) are show in colour on the graph below. 
Ungraded course performance (grade neutral courses) where performance is awarded on
a pass/fail basis is shown within individual bars in white shading below.  
4.18  Average Complementary Tariff Points 
Measure Commentary on performance
Lowest 20% - Graded
Moray performance (25) is marginally above the VC (23)
Moray performance (25) is very slightly below the Northern
Alliance (27) and National (27) comparators
Lowest 20% - Ungraded
Moray performance (86) is above the VC (82)
Moray performance (86) is slightly below the Northern
Alliance (89) and National (91) comparators
Middle 60% - Graded
Moray performance (172) is slightly below the VC (180)
Moray performance (172) is below the Northern Alliance
(202) and National (205) comparators
Midde 60% - Ungraded
Moray performance (355) is in line with the VC (357)
Moray performance (355) is below the Northern Alliance
(394) and National (405) comparators
Highest 20% - Graded
Moray performance (450) is marginally below the VC (467)
Moray performance (450) is below the Northern Alliance
(480) and National (486) comparators
Highest 20% - Ungraded
Moray performance (753) is in line overall with the VC (761),
very marginally below
Moray performance (753) is marginally below the Northern
Alliance (781) and National (783) comparators 
Page 274

Page 275

4.19  Complementary tariff presented above is a score that looks at parity of achievement of
young people in their top five qualifications studied.  It is not affected by the number of
qualifications and units that a young person completed; this removes the inequality and
anomalies with different curriculum structures across Scotland of which there are many. 
Reasons including quality of pass and level of study can impact on the overall tariff
measure, requiring schools to continue to work with young people and families in raising
aspirations and in order to aim high for positive achievement.    
4.20  3-year analysis:  Lowest 20%, Middle 60%, Highest 20% across SCQF levels 
Complementary Tariff Year Lowest 20% Middle 60% Highest 20%
Moray 2024 111 527 1204
VC 2024 105 538 1228
Northern Alliance 2024 116 596 1261
National 2024 118 610 1269
Moray 2023 113 529 1198
VC 2023 117 552 1255
Northern Alliance 2023 123 590 1269
National 2023 127 612 1286
Moray 2022 135 568 1231
VC 2022 133 605 1290
Northern Alliance 2022 143 628 1289
National 2022 138 644 1303 
Performance overall of the lowest 20% of leavers is above the VC, remaining slightly below
Northern Alliance and National comparators as with 2023.  Middle 60% performance is
marginally below VC, remaining below the Northern Alliance and National comparators as
with 2023.  Performance of the highest 20% of attaining leavers remains slightly below the
VC as with 2023, also below the Northern Alliance and National comparators.  A marginal
drop in leaver performance for the VC, Northern Alliance and National comparators is also
noted across most measures with exception of middle 60% Northern Alliance (2023-2024
increase noted).  
4.21  Schools continue to review their course offers, with a number extending their SCQF level 3
to level 6 course offers with a range of grade neutral (ungraded) courses including National
Progression Awards, Foundation Apprenticeships and wider awards such as Leadership,
Modern Languages for Life and Work, skills based courses and Personal Development
Awards.  This has led to improvements in performance of the lowest 20% of learners in a
number of our schools.  It is noted that for a number of measures above, Moray’s
performance is above, in line with or marginally below the VC.  
4.22  LEAVER INITIAL DESTINATIONS – INCREASED POST-SCHOOL PARTICIPATION
This measure shows the percentage of young people securing an initial positive post-
school destination when they leave school at their point of exit in S4, S5 or S6.  Destination
figures reflect choices made by pupils along with opportunities available to them upon
leaving school.  The availability of particular opportunities (e.g. apprenticeships and
employment opportunities) extend options available to school leavers.  As a result, this
may have impact on the number of young people progressing on to Further and Higher
Education as destination pathways. 
Page 275

Page 276

4.23  Leaver Initial destinations – percentage of school leavers in a positive destination 
Year Moray VC
Northern
Alliance
National
Establishment
2024 93.76 95.74 95.40 95.71
2023 95.06 95.63 95.09 95.87
2022 96.16 95.87 95.41 95.74
2021 94.08 95.64 95.32 95.48
2020 93.07 93.78 92.99 93.36
2019 92.76 95.30 94.98 95.05
2018 93.62 95.05 94.99 94.40
2017 93.53 94.02 94.39 93.72 
4.24  For session 2023/2024 Moray performs slightly below VC (95.74%) at 93.76%.  Moray also
performs slightly below the Northern Alliance (95.40%) and National (95.71%)
comparators.  The gap between Moray (93.76%) and the VC (95.74%) is 1.98%
representing 20 young people leaving school in total.  Overall, 932 young people in Moray
left school and progressed on to a positive destination on leaving school (e.g.
Further/Higher Education, Employment, Training) whereas 62 young people progressed on
to non-positive destinations which may have been impacted by health related reasons
(e.g. unemployed seeking, unemployed not seeking or where a young person’s destination
is not known by the school).  In relation to the Annual Participation Measure (16-19 year
olds) Scottish Government Stretch Aim set, Moray (93.76%) is within the stretch aim
trajectory set for 2023-2024 (93-94%) when applied to school leaver initial destinations.  
4.25  Leaver actual destinations:  session 2023/2024 
Page 276

Page 277

4.26  Data shown above for 2023/24 highlights more young people entering employment in
Moray compared with the VC, Northern Alliance and National comparators in 2023/24. 
Numbers of pupils entering Further Education is in line with the Northern Alliance, below
VC and National comparators.  Number of pupils entering Higher Education is below the
VC, Northern Alliance and National Comparators.  Personal Skills Development courses
are slightly above other comparators.  In 2023/24 it is noted that number of pupils in a
destination unknown, unemployed (seeking) and unemployed (not seeking) are marginally
above the VC, Moray and National comparators.  Figures are noted for comparison in the
table below in relation to post-school destinations of young people. 
Year Employed %
Further Education %
Higher Education %
Not known %
Personal Skills Development %
Training %
Unemployed Not Seeking %
Unemployed Seeking %
Voluntary W
ork %
Moray 2023/24 34.10 24.45 30.78 0.91 2.72 1.21 2.41 2.92 0.50
VC 2023/24 26.60 28.83 34.77 0.19 0.96 3.97 2.08 1.98 0.61
Northern
Alliance 2023/24 29.96 24.55 37.56 0.50 0.70 2.23 1.91 2.19 0.39
National  2023/24 23.08 26.43 40.80 0.27 0.93 3.89 1.86 2.16 0.58
Moray 2022/23 28.94 29.15 32.96 0.41 2.88 0.72 2.37 2.16 0.41
VC 2022/23 27.74 27.63 35.86 0.28 0.59 3.29 1.88 2.20 0.53
Northern
Alliance 2022/23 30.18 24.84 37.03 0.64 0.61 1.98 1.85 2.43 0.45
National  2022/23 24.34 26.62 40.30 0.32 0.75 3.35 1.57 2.24 0.52
Moray 2021/22 36.86 24.40 31.36 0.31 1.66 1.45 1.77 1.77 0.42
VC 2021/22 27.18 26.75 38.21 0.33 0.45 2.75 1.67 2.13 0.53
Northern
Alliance 2021/22 30.84 23.35 38.28 0.66 0.48 1.93 1.63 2.30 0.53
National  2021/22 25.11 25.45 41.27 0.40 0.51 2.92 1.54 2.32 0.47 
4.27  It is noted that change in post-school destinations is similar to those noted in session
2021/22 where more pupils also entered Employment with less pupils entering Further
and Higher Education.  This is in contrast to session 2022/23 where fewer leavers (28.94%)
entered employment.    
4.28  Increase in young people who are unemployed not seeking (24 young people) and
unemployed seeking (29 young people) and not known (9 young people) has been further
reviewed.  Moray schools continue to work with key partners including Skills Development
Scotland, Moray Pathways, Moray College UHI and wider employability partners in order to
ensure pupils are supported to positive onward destinations.  It is further noted, however
that health factors may impact on future pathways and routes to success for young people
where our schools continue to monitor this through early intervention approaches.  
Page 277

Page 278

4.29  TACKLING DISADVANTAGE BY IMPROVING THE ATTAINMENT OF LOWER ATTAINERS
RELATIVE TO HIGHER ATTAINERS
The graphs presented below show 2023/24 cohort leaver data (using complementary tariff
scores) for Moray against the VC and on the second graph, against the National
establishment (National averages).  Scottish Index of Multiple Deprivation (SIMD) is
referenced where Moray attainment is broken down into the ten SIMD deciles.    
4.30  Decile 1 refers to attainment of young people living in areas with postcodes considered the
10% most deprived in Scotland according to SIMD.  Decile 10 refers to those young people
living in postcodes identified as the 10% least deprived datazones according in SIMD.  The
Quality Improvement Team continue to monitor the use of SIMD as a measure in
authorities where rural poverty and other wider poverty related factors are of concern;
however, these are not fully considered nationally within SIMD classification.  
4.31  Attainment versus Deprivation (comparison against the VC) 
Performance Benchmarking:  Complementary Tariff Points 
SIMD1
SIMD2
SIMD3
SIMD4
SIMD5
SIMD6
SIMD7
SIMD8
SIMD9
SIMD10
Moray 209 321 399 457 521 565 622 687 629 745
VC 260 369 409 485 539 556 625 651 674 849
Pupils 16 16 39 98 158 164 213 175 52 63 
Positive performance overall is noted at SIMD 6-8 (552 pupils) with performance slightly
below VC at SIMD 3-5 (295 pupils).  Some underperformance is noted among the SIMD1-2
cohort (32 pupils in total) and SIMD 9-10 (115 pupils). Vertical blue lines within each SIMD
show the range of attainment for young people within each decile, noting both positive and
less favourable attainment for a variety of reasons as noted previously.  Larger circle size
represents a greater amount of young people within the SIMD decile.  A number of pupils
across SIMD deciles far exceed averages shown.  Trend line is closely aligned across SIMD
when Moray is compared against the VC.     
Page 278

Page 279

4.32  Attainment versus Deprivation (comparison against the National comparator) 
Performance Benchmarking:  Complementary Tariff Points 
SIMD1
SIMD2
SIMD3
SIMD4
SIMD5
SIMD6
SIMD7
SIMD8
SIMD9
SIMD10
Moray 209 321 399 457 521 565 622 687 629 745
National 453 479 525 562 603 652 712 752 823 935
Pupils 16 16 39 98 158 164 213 175 52 63 
Against the National Establishment (National average), an attainment gap is noted
between Moray and National figures across SIMD as noted by trend lines.  Blue vertical
lines once again show attainment spread with some young people across SIMD deciles far
exceeding Moray and National average performance.    
4.33  As noted in the Initial Analysis of Secondary School Attainment:  Session 2023-2024
Committee Paper presented for scrutiny and noting to this Committee on 26 November
2024, a range of actions are underway across our schools in order to raise attainment for
all.  This includes work underway to extend the curriculum offer and breadth of graded and
ungraded course options, supporting our learners through a range of wellbeing supports
and approaches, targeting support in schools where departments may require additional
focus and improving the consistency in quality of learning, teaching and assessment. 
Please refer to the Actions for Improvement (6.1-6.10).  
4.34  BREADTH AND DEPTH OF QUALIFICATIONS ACHIEVED BY LEAVERS
This measure considers the breadth (number) and depth (SCQF levels studied) of
qualifications achieved by young people in Moray.  This demonstrates the suite of
qualifications that our 994 leavers in session 2023/24 (slight increase from 971 in 2022/23,
963 leavers in session 2021/22) gained throughout their Senior Phase by point of exit,
whether in S4, S5 or S6 as they reach school leaving age or natural point of exit from their
secondary schooling based on their chosen pathway and qualifications required.  
4.35  The table below highlights overall performance across key breadth and depth measures
against the VC.  This measures how many qualifications learners achieved at all SCQF
Page 279

Page 280

level qualifications (SCQF level 5, 6, 7); this includes National 5, Higher and Advanced
Higher awards as well as other qualifications, including Skills for Work and National
Progression Awards at level 5.  Key measures are:  
• 1+, 3+, 5+ and 6+ qualifications at SCQF level 5
• 1+, 3+ and 5+ qualifications at SCQF level 6
• 1+ qualifications at SCQF level 7 
SCQF
Level 5
SCQF
Level 6
SCQF
level 7 
1+ 3+ 5+ 6+ 1+ 3+ 5+ 1+
Moray 2024 87.2% 74.3% 61.9% 55.0% 56.4% 43.1% 30.4% 19.8%
VC 2024 85.9% 73.9% 62.1% 55.2% 60.3% 44.6% 32.9% 20.5%         
Moray 2023 86.9% 74.6% 62.0% 56.0% 56.6% 42.3% 28.4% 19.4%
VC 2023 86.6% 74.3% 62.4% 55.7% 59.9% 45.9% 33.1% 21.7%         
Moray 2022 90.1% 76.2% 63.1% 56.0% 60.4% 45.6% 29.8% 21.2%
VC 2022 88.5% 77.2% 65.3% 58.3% 63.1% 49.5% 35.8% 23.3%         
Moray 2021 88.7% 79.3% 65.8% 57.3% 63.9% 49.7% 34.2% 23.7%
VC 2021 89.0% 78.7% 67.4% 60.5% 65.5% 52.0% 37.6% 24.1%         
Moray 2020 87.6% 74.6% 61.9% 55.1% 61.2% 48.5% 34.2% 22.0%
VC 2020 87.6% 76.5% 65.0% 57.4% 63.1% 50.3% 36.8% 22.6% 
4.36  At SCQF level 5, leavers achieving 1, 3, 5 and 6 or more qualifications at this level are
above the VC or in line with the VC overall.  Across breadth and depth measures at SCQF
level 6 (1, 3 and 5 or more qualifications), performance is marginally below the VC.  In
context, the largest variance between Moray and VC is 3.9% representing 22 learners (1 or
more qualifications at SCQF level 6).  In relation to Scottish Government Stretch Aims,
these are set as core stretch aims in relation to the number of young people achieving 1or
more qualifications at SCQF Level 5 and 1 or more qualifications at SCQF level 6.  In
Moray, 87.2% of young people achieved 1 or more qualifications at SCQF level 5, within the
stretch aim trajectory for 2023-2024 (85%-88%).  Similarly, 56.4% of young people
achieved 1 or more qualification at SCQF level 6, marginally below stretch aim trajectory
for 2023-2024 (60-64%).  
4.37  Schools continue to progress key actions outlined in the Initial Analysis of Secondary
School Attainment:  Session 2023-2024 Committee Paper presented for scrutiny and
noting to this Committee on 26 November 2024.  This includes further exploration of
Foundation Apprenticeships as ungraded courses in support of young people to SCQF
level 6 and wide consortia approaches to SCQF level 7.    
4.38  Following initial attainment meetings in August 2024 to review the session 2023/24
attainment data and SQA results, the Head of Education in discussion with the Depute
Chief Executive initiated a revised approach to initial attainment meetings with the Quality
Improvement Manager. Meetings were held virtually or in person with all eight secondary
Head Teachers, a number of those meetings also attended by the Depute Chief Executive.
Meetings held were to discuss performance, data and trends, strengths and areas for
improvement.    
Page 280

Page 281

4.39  Continued support and challenge has continued during the session with summary data
collection periods introduced as well as interim progress and attainment meetings. 
Please refer to the Initial Analysis of Secondary School Attainment:  Session 2023-2024
Committee Paper (para 6.9) for further detail in relation to key actions identified for
improvement which continue to be monitored as ongoing data pertaining to pupil
performance is reviewed.  Further detail in relation to school performance is also available
through the Education Public Performance Report for Primary and Secondary Schools
2023/24.  
4.40  Through the Moray Quality Improvement Framework (MQIF) the Quality Improvement Team
continue to support and challenge school improvement with a range of school visits
planned and underway, guiding schools in areas for improvement and progress with
improvement actions.  Education also continues to monitor the use of additional monies
in our schools supported through Strategic Equity Funding (Scottish Attainment
Challenge) with a range of projects in place in support of strengthening pupil attendance,
engagement and participation (5 secondary schools directly or indirectly benefitting from
these projects).    
4.41  Schools are in the process of reviewing plans for improvement following additional monies
being made available to strengthen Senior Phase Attainment next session as noted
through Special Moray Council on 26 February 2025 in the 2025/26 Budget and 2025 to
2028 Financial Plan Committee Report (section 3.5) (para 3 of minute refers).  Pro-rata
share of an Intervention Fund for each school based on pupil numbers will further be used
to support tackling poverty and inequality in our schools, with a view to raising attainment
and achievement through outcome driven targeted interventions. 
5.  PROPOSALS  
5.1  It is proposed that the Committee scrutinise and note the contents of this report,
reviewing Moray’s Senior Phase Leaver Attainment across Moray Secondary Schools
during session 2023/2024.  Attainment of all pupils was previously reported to Committee
within the Initial Analysis of Secondary School Attainment:  Session 2023-2024
Committee Paper where this report considers leaver performance (S4-S6) only, following
Insight benchmarking data release in February 2025.  Committee is further invited to
consider improvement activities planned or underway as well as where identified actions
for improvement are noted through data presented.  This report presented to Committee
concludes Education service reporting on attainment for this session.  
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) ✓ 
Policy and Legal  ✓
Financial  ✓
Risk ✓ 
Staffing ✓ 
Page 281

Page 282

Best Value and Transformation  ✓
Property  ✓
Information Communications Technology/Digital ✓ 
Equalities. Social Inclusion and Economic Impact            ✓ 
Climate Change and Biodiversity Impact  ✓ 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population   
6.3  Policy and Legal 
Responsibility for the quality of education delivery rests with the relevant local authority,
as defined in section 1 (1) of the Education (Scotland) Act 1980 and further detailed within
the Standards in Scotland’s Schools etc. Act 2000. 
6.4  Financial 
There are no financial implications arising directly from this report.  Additional funding
has been granted in order to secure improvements in Senior Phase attainment as
reported through the Special Moray council on 26 February 2025 and the 2025/26 Budget
and 2025 to 2028 Financial Plan Committee Report.  Financial implications may arise in
the future per 6.5 (Risk) below vis a vis ICT resources and provision. 
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend this
Year
Virement
From
Other
Comments
- - - - - - 
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments
- - - - - -
Page 282

Page 283

6.5  Risk 
There are risk implications as to how this attainment dataset will continue to be used as
comparator data for the next 3-5 years and may skew future performance reporting.  The
data presented herein reflects year 3 of a return to SQA examinations following two years
of an Alternative Certification Model (ACM) over a 5-year trend period, much different to
the previous two years of ACM in 2020 and 2021.  Similarly, 2024 witnessed return by SQA
of coursework to National Qualifications in most subject areas (only subject areas where
this was not considered appropriate led to maintaining 2023 assessment arrangements). 
The conditions for assessment in this year’s SQA Examination diet (pandemic related) are
most similar to 2019 with where coursework completion required time in class for
completion, not required in session 2022 and 2023.  A number of learners have found
additional coursework assessment to be challenging, where attendance concerns relating
to some young people has impeded coursework completion. 
Actions for improvement identified highlight desire for improved collaboration and
potential to extend consortia arrangements.  This continues to be impacted by ongoing
digital connectivity and bandwidth issues in respect our ICT Education network operating
in schools.  As a results, schools continue to repeatedly report operational issues with ICT
infrastructure, log-in times, access to core software, devices and poor connectivity having
notable impact on learning, teaching and assessment, learner access to digital platforms,
school administration, also impeding exploration of school-to-school/school to external
learning partner digital consortia approaches.  Colleagues within ICT continue to work
closely with schools within existing resources in order to remedy issues arising on an
ongoing basis, where Education colleagues appreciate ongoing support provided.  Some
improvement has been noted this session, with imminent change of internet provider and
move to SWAN 2 anticipated to realise further improvements in the session ahead. 
Further improvements in ICT infrastructure and further actions planned were reported
previously to this Committee by the ICT Infrastructure Manager (Educational Digital
Infrastructure Readiness Update; Education, Children’s and Leisure Services Committee,
18 February 2025) (para 16 of minute refers). 
Improvement in digital  provision is required in order to realise positive consortia
approaches and digitally enabled learning and teaching, with absence of 1:1 devices for
learners in Moray impacting on learner experiences.  Looking outwards where local
authorities are digitally enabled, this is having direct positive impact on learning, teaching
and assessment and overall achievements of learners in schools where equity in digital
access is supported for all.  As new digital technologies continue to be explored, this is of
further concern as Moray look to the curriculum of the future. 
There is further consideration that more young people continue to stay on at school
beyond S4 and S5 due to increased anxiety and wider wellbeing factors.  This has been
noted in some of Moray’s secondary schools, requiring creativity regarding potential
course options and levels of study.  Parent/carer support can vary resulting in lower levels
of ambition experienced where schools aim to maximise learner achievement and
attainment.  Schools continue to support young people through a range of wellbeing and
wider learning supports.  Schools also report increase in anti-social behaviours and
attendance issues, impacting overall on learner achievement and continuity in learning.  In
a number of schools, challenging and disruptive behaviours of a small minority of young
people has adverse impact. Senior Leadership Teams attempt to mitigate issues
Page 283

Page 284

experienced and seek support of wider partners in order to address individual social,
emotional and behavioural issues outwith their scope of expertise. 
Schools observe increase in Additional Support Needs among pupils, impacting on
number of courses studied and levels of study.  This has noted effect on attainment
measures outlined above.  A number of young people may access a personalised
curriculum with individual targets and outcomes.  This requires schools to allocate
resource in a targeted way within funding available based on current cost per pupil status
as a local authority.  
6.6  Staffing 
No staffing implications arise directly from this report other than risks noted above and
potential to impact on staff wellbeing and attendance.  Where staffing vacancies arise in
specific subjects in secondary, particular difficulties in recruitment have been experienced. 
In recent sessions, this has included recruitment to posts in Maths, Home Economics,
Technical and English as well as discrete Science based subject areas.  This has also
resulted in schools developing creative timetabling approaches through, for example,
appointment of BGE Teachers of Numeracy who are Primary qualified but within registration
requirements, may teach specific Broad General Education classes.   
In some schools, curriculum choice has been narrowed due to inability to recruit to specific
subjects/posts, impacting on raising attainment for all. Limited availability of supply
teachers in secondary, particularly those with subject specialism which may be required,
can result in senior leadership teams becoming classroom based, covering classes and
detracting from strategic improvement priorities and progress.  
6.7  Best Value and Transformation 
There are no Best Value and Transformation implications where this report is to inform
Committee on school performance and attainment.  
6.8  Property 
There are no property implications arising directly from this report.  
6.9  Information Communications/Technology/Digital 
There are no Information Communications/Technology/Digital implications arising directly
from this report.  Please see section 6.5 (Risk) above and impact of ICT provision and
current network operating status on curriculum delivery and raising attainment.  
6.10  Equalities, Social Inclusion and Economic Impact 
Although an Equality/Socio Economic Impact Assessment is not required as this report is
to inform Committee on school performance following external scrutiny/validation
activity, it is important to note the data in relation to measure (4) - Tackling disadvantage
by improving the attainment of lower attainers relative to higher attainers.  
Consideration will continue to be needed to identify any improvement actions/planning
through School Improvement Plans and wider Pupil Equity/Strategic Equity Plans, in an
attempt to address this inequality and lessen any disadvantage cause by socio-economic
or inter-sectional issues.    
6.11  Climate Change and Biodiversity Impacts
Page 284

Page 285

No climate change or biodiversity implications have been determined due to the scrutiny
based nature of activities reported and no findings related to such implications contained
herein.     
7.  CONSULTATION  
7.1  This report has been prepared in consultation with the Depute Chief Executive (Education,
Communities and Organisational Development), Head of Education (Chief Education
Officer), Equal Opportunities Officer, Human Resources Manager, Caroline O’Connor,
Committee Services Officer and Senior Officers in Education, Communities and
Organisational Development and any comments made have been incorporated into the
report.  
8.  BACKGROUND PAPERS  
8.1  Initial Analysis of Secondary School Attainment:  Session 2023-2024 Committee Paper
Education Public Performance Report for Primary and Secondary Schools 2023/24
2025/26 Budget and 2025 to 2028 Financial Plan   
Page 285

Page 286

Page 286

Page 287

Report to: Education, Children’s and
Leisure Services
Committee 
Meeting Date: 13 May 2025  
Report by: Depute Chief Executive
(Education, Communities
and Organisational
Development) 
Report No: EDU002/25/AH  
Author: Andy Hall Contact Email: learningestate@moray.gov.uk 
Subject: Education and Education, Resources and Communities Capital Budget
Monitoring Report to 31 March 2025 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to inform Committee of the capital budget position for
Education and Education, Resources and Communities as at 31 March 2025.  
1.2  This report is submitted to Committee in terms of Section III (A) (2) of the Council's
Scheme of Administration relating to the consideration of Capital and Revenue budgets
and long-term financial plans. 
2.  SUMMARY  
2.1  This report presents the Education and Education, Resources and Communities capital
budget position to 31 March 2025. It highlights and provides detail on any variances since
the Quarter 3 monitoring report and provides an update to Committee on agreed named
major projects and an insight into projects planned for the next financial year. 
3.  RECOMMENDATIONS  
3.1  It is recommended that the Committee scrutinises and notes the capital budget
position as at 30 April 2025.   
Andy Hall
Programme Manager (Learning Estate) 
Item 20.*
Page 287

Page 288

4.  BACKGROUND  
4.1  It is the practise of this Committee to receive regular reports providing an update on the
current financial position of the Education and Education Resources and Communities
Capital Budget programmes and projects.  
4.2  At the meeting of Moray Council on 24 January 2024, the Capital Plan for 2024/25 was
approved (para 11 of minute refers).  At the meeting of Moray Council on 26 June 2024
(para 13 of minute refers), carry forward for capital budget within Education and Education
Resources and Communities was approved.  
4.3  This report highlights those areas of the capital budget relating to Education and
Education Resources and Communities where there is a significant percentage variance
as at 31 March that was not reported in the Quarter (Q)3 report (highlighted as red or
amber in the budget update at Appendix 1). 
5.  BUDGET POSITION  
5.1  The total approved capital budget for Education and Education Resources and
Communities and Education for financial year 2024/25, including carry forwards from
2023/24 and amendments in the year, is: 
2024/25 
£000
Land and Buildings 15,038
Vehicles Plant and Equipment 263
Total 15,301 
5.2  The actual expenditure up to 31 March 2025 was £4,431,000  
5.3  Current variance (or risk of variance) in the Capital Plan relate to the following: 
Schools Essential Maintenance / BB Upgrade Programme 2024/25 
5.4  The planned expenditure on school B/B condition and suitability upgrade, building
element replacement and compliance works for 2024/25 is 2 lines within the Capital Plan
which totalled £6m.  The first line is made up of a £5m budget for actual upgrade works,
and the second line a £1m budget for preparatory works (detail design, planning and
tendering) for building works planned to go ahead over the next two financial years –
supporting a 3 year project delivery timeline for these works. This approach was
established to support the design and build project stages and associated project budgets
that extend over one or more financial years. 
5.5  The current in year budget for each individual project is detailed in Appendix 1 for budget
monitoring purposes. The majority of the programme is phased work which seeks to
address school fabric and components, as defined in the Scottish Government’s
Condition Core Fact guidance, graded as Condition D with the possibility of full or partial
failure or works to ensure building standards or other statutory compliance. 
Page 288

Page 289

5.6  It was reported in both the Q2 and Q3 monitoring reports that there would be a likely
underspend of ‘preparatory’ design budget (Appendix 1 – Line 39 ) as the investment in the
learning estate transitioned from a ‘make-do-and-mend’ approach, in place for almost a
decade that has resulted in a significant decline in the condition and suitability of
buildings across the learning estate, to an asset management approach to school
buildings over the last 12 months. Coupled with the absence of recent core condition
building reports required to inform asset improvement planning this has resulted in a
significantly more challenging task to develop a prioritised list for works and undertake the
task to complete project design packages for competitive tender than was envisaged at
the start of this financial year. Consequently, the majority of upgrade projects planned for
this financial year are either in an earlier stage of design than planned or not yet started.
This has resulted in forecast underspend of the BB design allowance budget of £791,000
allocated for this year and a request will be made to carry this forward to planned BB
projects in financial year 2025/26. 
5.7  The Q3 report detailed significant variances in the BB upgrade projects at Mortlach PS,
Milnes HS, Speyside HS, Bishopmill PS and East End PS due to the requirement to
reprofile planned work into the next financial year. There has been no change to these
projects and the underspends  highlighted in Appendix 1  will be carried forward into
financial year 2025/26. 
5.8  It was reported in the Q3 report that due to upgrade design issues and subsequent tender
process that a reprofiling of Cullen Primary School B Condition/Enerphit project was
required and a request to Council to carry forward a budget of £546,000 (of which a
significant element was part of the £593,888 SALIX grant award for this pilot). Additional
design work has been completed and the carry forward request is now £502,000. 
5.9  Following a review of the subsidence issues at Alves Primary School by external specialist
consultants some drainage issues that were impacting subsidence risk were identified at
the boundary with agricultural land to the south of the site and urgent work instructed as a
precursor to works planned in financial year 2025/26. No budget had been allocated for
works this year and has resulted in an overspend of £16,000.   
5.10  The Q3 report did not take account of the retention sum for the Milnes HS roof works that
was completed in October 2024 and this accounts for the Q4 £29,000 variance against
this project.    
Forres Academy – Reinforced Autoclaved Aerated Concrete Mitigation
5.11  A budget of £245,000 was allocated a risk contingency to cover costs to remediate any
further discovered Reinforced Autoclaved Aerated Concrete Mitigation works on Forres
Academy.  Total cost for works has been £205,000, which has addressed RAAC issues
discovered in the kitchen and technical teaching block areas, together with fire door
replacement to meet a changed building fire strategy.  A request will be made to Council in
June carry forward the budget underspend of £40,000 into financial year 2025/26.  
Elgin High School Capacity Extension Project
5.12  The decision was taken to pause the project for up to 12 months at the conclusion of
concept design phase to allow a reassessment of the future school capacity
Page 289

Page 290

requirements. The Q3 projected spend for financial year 24/25 of £416,000 included a final
Hub Stage payment of £57,000. Due to delays in delivery of the Stage 1 Concept Design
report this has not been invoiced and this has been reprofiled into 2025/26 Q1.   
Future Forres Academy Project 
5.13  The Future Forres Academy project completed RIBA Stage 2 Concept Design and delivered
the final report on 11 April.  The project has moved into RIBA Stage 3-4 (detailed design,
planning and construction contracting) which should be completed by March 2026. The
financial year spend projected for Q4 was the £1.186m reported in the Q3 report.  A full
project status report is a separate item on this Committee agenda. 
Future Buckie High School
5.14  A full project status report is a separate item on this Committee agenda. 
Universal Free School Meals
5.15  The Scottish Government has indicated it will not look to fully roll out to the remaining P6-
P7 cohort during this administration although it would extend to those P6-P7 children in
receipt of Scottish Child Payments (SCP) and an additional capital grant of £92,000 was
received from Scottish Government in September 2024 to support this.  The total spend
for financial year 2024/25 was  £53,000 to support further kitchen equipment procurement
and to increase capacity in dining areas across several primary schools. A carry forward of
the remaining £600,000 grant budget to financial year 2025/26 will support further kitchen
and dining area capacity extension projects to support further increase in existing P4-5
and P6-P7 SCP entitled pupils free school meal take up over the next two years and initial
preparatory work to support a full P6-P7 free school meal roll out during the next Scottish
Government administration noting that further grant capital funding would be required to
complete all identified infrastructure works.    An information report providing a more
detailed update on the Universal Free School Meals project has been submitted to
Committee. 
Planned BB Upgrade Programme 2025/26
5.16  The priority school BB upgrade projects planned for financial year 2025/26 together are
outlined in the table below. This includes some projects that have been reprofiled from
financial year 2024/25. 
School Project Outline FY 25/26
Budget (£)
Speyside HS  Windows and Doors 982,280
Milnes HS  Windows and Doors 879,941
Cullen PS Phase 1 - Upgrade External Fabric
Phase 1 – initial M&E works
2,800,000
Alves PS Subsidence rectification
Phase 1 – external fabric
1,180,000
Mortlach PS Phase 1 – external fabric   968,000
Mosstodloch PS Phase 1 - roof replacement/upgrade 515,000
Rothes PS  Phase 1 - Upgrade External Fabric 230,000
East End PS Final Phase - External walls and
insulation
435,000
Total 7,990,221 
Page 290

Page 291

5.17  Phase 1 works relates to external fabric projects related to roof, windows, wall and doors
upgrades to improve overall building energy efficiency prior to Phase 2 works that will
address mechanical and electrical works in readiness for heat source replacements either
in Phase 2 (where existing heat source is at or approaching life expired) or at Phase 3. 
5.18  Although the Phase 1 elements of these projects is affordable and allocated within
learning estate capital budget for financial year 2025/26 the reduction in the 3 year capital
budget will likely have an impact on Phase 2 and the detail of this will be determined over
the next quarter and will be reported to Committee.       
Early Learning and Childcare
5.19  There is a limited amount to report in relation to progress in Q4 in Early Learning and
Childcare (ELC) as almost all capital work projects are now completed. The underspend
from Portgordon will be carried into financial year 2025/26 to support with the planned
upgrades at Seafield Nursery. This is to meet Care Inspectorate requirements for toileting
and nappy changing with the variation in numbers of children able to attend. 
Libraries and Leisure
5.20  Land & Buildings (L&B)
The main areas of progress in Q4 were the successful resurfacing of the astropitch at Keith
and conversion to LED lights.  The floodlights at the Buckie astroturf pitch were also
converted to LED lights to improve environmental sustainability and efficiency.  Due to
clarity on future library provision not being confirmed until February 2025 certain areas of
library branch refurbishment were not progressed and this is now being planned. 
5.21  Vehicle, Plant & Equipment (VPE)
Projects have progressed as required to improve the operation of leisure and library
facilities, including Moray Leisure Centre.  Due to the uncertainty over the leisure and
library estate during 2024/25 only critical spend was progressed to avoid abortive or
unnecessary spend if major changes to service operations were to occur.  
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  ✓
Policy and Legal  ✓
Financial ✓ 
Risk ✓ 
Staffing  ✓
Best Value and Transformation ✓ 
Property ✓ 
Information Communications Technology/Digital  ✓
Equalities. Social Inclusion and Economic Impact   
Climate Change and Biodiversity Impact   
Page 291

Page 292

6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population   
6.3  Policy and Legal 
The Council has statutory responsibilities to meet educational needs, the needs of
children and young people in need and those it looks after.  
6.4  Financial 
The financial implications are set out in this report and at Appendix 1. Budget managers
are aware of their responsibilities for managing budget allocation and approval for any
unavoidable variance will be sought from the Council in line with the financial
regulations. 
The capital plan approved by Council on 21 January 2025 detailed the outcome of the
annual 10-year capital plan review and the council approved overall Council capital
spend of £86m over the next 3 years, which included a £32.4m reduction impacting the
Learning Estate programme planned budget named and core projects. 
Given the requirement to set an affordable capital spend across Council services and
ensure compliance with prudential borrowing rules, there will be no increases to the 3
year capital budget.  However, there are significant strategic and operational risks
associated with this that will impact the existing learning estate delivery strategy that will
require to be monitored and managed on an ongoing basis. 
Further significant capital investment in the BB Condition/Suitability upgrade projects
would be required to improve the condition of schools across Moray. In applying that
focus to the Learning Estate the asset standard (condition and suitability) for schools is
set as a B (satisfactory) minimum.  With the reduction in the capital budget available the
only realistic options for the Learning Estate are to reduce assets or to lengthen
programmes of work. Taking this into account, the BB upgrade programme plan has now
been extended from 10 to 15 years, acknowledging that in this scenario more revenue
funding will need to be assigned to reactive repair and maintenance. 
Page 292

Page 293

6.5  Risk 
The school estate (excluding new build) continues to deteriorate with now 32 out of the 53
schools reported as C (Poor) condition and a further 2 as D (Bad) condition. Without the
level of investment reported in para 4.3 and managing the affordability factors outlined in
para 5 (c) the risk of building failures, temporary closures and/or health and safety
continue to be a concern.   
This longer phasing of BB upgrade works brings a risk that learning estate assets will
continue to deteriorate, and the risk likelihood of building failure, either partial or fully, will
increase and school contingency plans will need to be robust to support such
eventualities. The realistic options for the Learning Estate are to reduce assets and/or
lengthen programmes of work. The BB upgrade programme plan has assumed that it is
now working towards a 15 year rather than 10 year timescale and the risk management
approach required to support this is still to be determined. 
The leisure and libraries estate continues to deteriorate with 50% reported as C (poor)
condition.  With the level of investment required outweighing available budget the risk of
building failures, temporary closures and/or health and safety continue to be a concern. To
fully assess this, it is planned to update building survey work and use this as a basis to
inform proposals for longer term management of the assets.  
6.6  Staffing 
There no staffing implications arising directly from this report.  
6.7  Best Value and Transformation 
There are no best value and transformation implications associated with this report.  
6.8  Property 
There are no property implications other than those detailed in the report.  
6.9  Information Communications/Technology/Digital 
There are no property implications other than those detailed in the report.  
6.10  Equalities, Social Inclusion and Economic Impact 
There are no equalities or socio-economic implications associated with this report.  
6.11  Climate Change and Biodiversity Impacts 
A number of detailed technical surveys have been completed to support Enerphit
(Passivhaus standard to achieve a high level of building thermal performance) informed
retrofit based investment decisions focused on the value for money impact of fabric and
heating/power improvements across a selection of school architectural types. These have
already informed BB upgrade design options for projects, notably Cullen Primary School
(which benefits from SALIX grant funding). 
All BB upgrade projects will consider the Enerphit Informed Retrofit approach to support
design options to increase energy efficient and reduce carbon emissions of school
buildings. 
Page 293

Page 294

7.  CONSULTATION  
7.1  This report has been prepared in consultation with Chief Finance Officer, Finance
Manager, Property Asset Manager, Design and Construction Manager, Programme
Manager (Learning Estate), Early Year’s Service Manager, Sports and Culture Service
Manager, Legal Services Manager, Strategy and Performance Manager and Caroline
O’Connor, Committee Services Officer have all been consulted and the comments
received have been incorporated into the report.   
8.  BACKGROUND PAPERS  
8.1  There are no background papers to this report.   
Page 294

Page 295

Report to: Education, Children’s and
Leisure Services
Committee 
Meeting Date: 13 May 2025  
Report by: Depute Chief Executive
(Education, Communities
and Organisational
Development) 
Report No: EDU025/25/VC/AMB  
Author: Vivienne Cross Contact Email: education@moray.gov.uk 
Subject: Education Revenue Budget Monitoring to 31 March 2025 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to inform Committee of the budget position for Education as
at 31 March 2025.  
1.2  This report is submitted to Committee in terms of Section III (A) 2 of the Council’s scheme
of Administration relating to the consideration of capital and revenue budgets and long
term financial plans. 
2.  SUMMARY  
2.1  The report provides the revenue budget monitoring for Education as at 31 March 2025. 
There is a variance of an underspend of £851,000 from the planned budget for the service
which includes efficiency savings of £793,000.  Variances are detailed below which
contribute to the overall position. 
3.  RECOMMENDATIONS  
3.1  It is recommended that Committee:   
i)  Scrutinises and notes the budget position at the end of the financial year.   
Vivienne Cross
Head of Education (Chief Education Officer) 
4.  BACKGROUND AND BUDGET POSITION
Item 21.*
Page 295

Page 296

4.1  The report highlights those areas of budget where there is a variance identified at the end
of the financial year.  
4.2  The spend at 31 March is £117,965m against a budget of £118,816m giving an underspend
of £851k, as shown in the table below. 
Educational Services     
Budget Monitoring Report to
31 March 2025 
Service  Revised
Budget 
Budget to
Date   
Actual to
Date 
Variance
to
Date  
Variance  
£'000   £'000   £'000   £'000  %      
Early Learning and Childcare 15,277  15,277  15,820  (543) (4)%
Primary Education 35,002  35,002  34,760  242  1 %
Secondary Education 39,594  39,594  39,212  382  1 %
Additional Support Needs 19,498  19,498  19,462  36  - 
Education Central Services 5,233  5,233  4,757  476  9 %
Management 140  140  134  6  4 %
Out of Area 3,279  3,279  3,820  (541) (16)%
Efficiency Savings-Education 793  793  - 793  - 
- 
Educational Services Total 118,816  118,816  117,965  851  - 
4.3  The variance in Early Learning and Childcare (ELC) Education is a £543 overspend which
relates to an underspend in ELC snack and fundraising of £25k which has now been
transferred to ear marked reservices at the end of the financial year,  £10k of underspend in
staff training, £10k of underspend in the Speech and Language contract related to a delay in
recruitment and £3k of small underspends.  The service predicted an overspend in payments
to partner providers although this is greater than predicted at £599k and relates mainly to the
January intake where the service is currently working on a forecasting tool for next session.  
4.4  In Primary Devolved School Management (DSM) scheme, there is an underspend of £242k
across all schools.  This relates to an underspend of £116k within the devolved budget and
an underspend of £126k in the non-devolved costs comprising of £14k underspend in
oncosts, £116k underspend in energy costs, £3k overspend in grounds maintenance and £4k
underspend in rent and rates.   
4.5  The Secondary DSM scheme has an underspend of £382k across the eight schools.  This
relates to an underspend of £271k in the devolved budget and £111k in the non-devolved
budget made up of underspends in energy costs of £115k and grounds maintenance £1k and
overspends in oncosts £3k and rent and rates of £2k.    
4.6  Within Additional Support Needs there is an overspend of £36k. This comprises of
underspends in staff travel of £17k while change management plans were finalised, £41k in
Speech and Language Therapy, £4k in translation services and overspend in Legal Fees for
Tribunal of £21k and other minor overspends of £5k.  
Page 296

Page 297

4.7  The variance in Education Central services is a £476k underspend which relates
underspends of £28k for sanitary products, £11k in disturbance mileage, £10k in staff
advertising, £10k in relocation costs, £6k for staff transport, £15k in clothing grants and
minor underspends of £12k.  In addition there are underspends of £763k in Pupil Equity
funding, £232k in Strategic Equity Funding and £22k in the Care Experienced Children and
Young People funds however this spend covers the financial year and the underspend is
carried forward in earmarked reserves to cover the academic year. There are also
overspends of £600k in central supply, £27k for insurance excess and £6k in exam fees. 
4.8  The out of area budget is overspent by £541k and a separate paper to this Committee
provides detail regarding this. 
4.9  Progress on delivering savings approved for 2024/25 for the service:   
Approved
Saving
£000
Achieved
Saving
£000
Reason for non
achievement
Primary Advisor roll 15 15 
ELC PSA post deleted 12 12 
ELC reduce teaching team by 2 83 83 
Primary DSM – pupil teacher ratio 42 41 
Secondary DSM – reduce  188 192 
Central team – remove QIM 109 85 Saving started in August
2024. Balance of saving will
be made in 25/26
Remove 1 learning technologist 50 43 
5.  PROPOSALS  
5.1  The service will develop a process to forecast ELC registrations to better budget for
payments to partner providers. 
5.2 Committee is asked to review and note the revenue budget position at 31 March 2025. 
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) x 
Policy and Legal x 
Financial x 
Risk x 
Staffing  x
Best Value and Transformation  x
Property  x
Information Communications Technology/Digital  x
Equalities. Social Inclusion and Economic Impact   x
Climate Change and Biodiversity Impact  x
Page 297

Page 298

6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population   
6.3  Policy and Legal 
The Council has statutory responsibilities to meet educational needs, the needs of
children and young people in need and those it looks after.  
6.4  Financial 
The resource implications are set out in this report.  The underspend as at 31 March 2024
is £851,000 against a budget of £118, 816,000.   
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend this
Year
Virement
From
Other
Comments       
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments       
6.5  Risk 
Budget managers are aware of their responsibilities for managing budget allocations and
approval for any variances will be sought from Committee in line with Financial
Regulations.  The overspends in the out of area budgets and central supply budgets are
not easy to mitigate against where decisions about children and young people are often
out of the services control with detail provided in a separate paper.  Similarly central
supply is unpredictable with long term absence and maternity leaves where a
replacement teacher must be put in place to continue to deliver education.  
Page 298

Page 299

6.6  Staffing 
There are no staffing implications arising from this report.  
6.7  Best Value and Transformation 
There are no best value or transformation implications from this report.  
6.8  Property 
There are no property issues arising from this report.  
6.9  Information Communications/Technology/Digital 
There are no property issues arising from this report.  
6.10  Equalities, Social Inclusion and Economic Impact 
This is  not relevant as this report is to inform the Committee on budget monitoring.  
6.11  Climate Change and Biodiversity Impacts 
This is not applicable. 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with Nicky Gosling, Accountant and
Caroline O’Connor, Committee Services Officer and any comments made have been
incorporated into the report 
8.  BACKGROUND PAPERS  
8.1  nil   
Page 299

Page 300

Page 300

Page 301

Report to:   Education, Children’s
and Leisure  Services
Committee 
Meeting Date: 13 May 2025  
Report by: Depute Chief Executive
(Education Resources &
Communities) 
Report No: DCE(ECOD)004/25  
Author: Denise Whitworth Contact Email:  denise.whitworth@moray.gov.uk 
Subject: Education Resources And Communities Revenue Budget Monitoring to 31
March 2025 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to inform the Committee of the budget position for Education
Resources and Communities as at 31 March 2025.  
1.2  This report is submitted to This report is submitted to Committee in terms of Section III (A)
(2) of the Council’s Scheme of Administration relating to the consideration of capital and
revenue budgets and long term financial plans. 
2.  SUMMARY  
2.1  This report provides the revenue budget monitoring for the Education Resources and
Communities Service as at 31 March 2025.  There is a variance of an underspend of
£441,000 from the planned budget for the service which includes efficiency savings of
£242,000 arising from staff vacancies and salary placings as well as an overachievement of
£95,000 in Leisure income and reconciliation of insurance within the Learning Estate which
gave an underspend of £137,000.  Other smaller variances as set out in the report make up
the overall position. 
3.  RECOMMENDATIONS  
3.1  It is recommended that Committee scrutinises and notes the budget position at 31
March 2025 and to approve the carry forward of the underspend of £34,000 in
participatory budgeting grants in an ear-marked reserve.   
Denise Whitworth
Item 22.*
Page 301

Page 302

Depute Chief Executive (Education, Communities and Organisational Development) 
4.  BACKGROUND AND CONTEXT  
4.1  The report highlights those areas of the budget where there is a significant percentage
variance identified as at 31 March 2025.  
4.2  The spend at 31 March 2025 is £12,826,000 against a budget to date of £13,267,000 giving
an underspend of £441,000, including planned efficiency savings of £242,000 as shown in
Table 1 below. 
4.3  The variance in Culture, Sport and Leisure Services is due to an over achievement of leisure
income of £95,000 offset by a total overspend of £81,000 of which the most significant
variances are: energy (£13,000), libraries income (£12,000) and library books (£27,000) with
the remainder made up of small amounts across a number of headings each under £10,000 
4.4  There is an underspend of £34,000 in participatory budget grants which it is proposed to
carry forward in an ear marked reserve and there are minor underspends in the youth work
and other small amounts totalling £10,000. 
4.5  The reconciliation of insurance within the PPP contracts has given an underspend of
£137,000 although this is offset by less income from PPP contract deductions than budget
for (£28,000) and an adjustment to utilities taking the balance at 31 March in this area to an
underspend of £105,000. 
4.6  There are also small underspends in operational budgets within learning estate and other
minor underspends amounting to £33,000 
4.7  Table 1: Budget Monitoring to 31 March 2025 
Service 
Revised
Budget 
Budget to
Date   
Actual to
Date 
Variance
to
Date   Variance   
£'000   £'000   £'000   £'000  %            
Communities 1,419  1,419  1,375  44  3 %
Culture, Sport & Leisure 4,299  4,299  4,282  17  - 
Learning Estate 287  287  259  28  10 %
Business Support Unit 691  691  687  4  1 %
ERC Management 1  1  - 1  100 %
Public Private
Partnership 6,328  6,328  6,223  105  2 %
Education Resources &
Communities Efficiency
Savings 242  242  - 242  - 
-  
Education Resources
& Communities Total 13,267  13,267  12,826  441  - 
Page 302

Page 303

Table 2: progress on delivering savings approved for the service 
Approved    Achieved    Reason for 
Saving   Saving   Variance  
£000   £000    
Business Admin remove 4 posts 55   111  
Saving was to be
over 2 years but
due to vacancies
the full saving has
been taken in 24/25
Primary School FM - Delete PAT testing
post and contract out 27   27    
Sport and Culture - Replace mobile
library with redesigned service 20   20    
Sport and Culture - Remove Health and
Wellbeing Officer post 51   51    
Communities Team - Remove 1 Outdoor
Learning post 59   59    
Communities Team - Remove 1.75fte
from the  Community Support Unit
88   88   Saving started
August 2024.
Balance of saving
will be made in
25/26
Communities Team - Reduce community
capacity training budget
4   4   Saving started July
2024. Balance of
saving will be made
in 25/26
Elgin Community Centre closure - VER 163   123   Balance of saving
will be achieved
when building sold
Library contract management systems 7   7    
Relocate staff from Auchernack and
Forres Community Centre staff
restructure
20   23      
5.  PROPOSALS  
5.1  The Committee is asked to review and note the revenue budget position at 31 March 2025
and to agree to carry forward the underspend of £34,000 in participatory budgeting grants in
an ear-marked reserve.  
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) ✓ 
Policy and Legal  ✓
Financial ✓ 
Page 303

Page 304

Risk  ✓
Staffing  ✓
Best Value and Transformation  ✓
Property  ✓
Information Communications Technology/Digital   ✓
Equalities. Social Inclusion and Economic Impact   ✓
Climate Change and Biodiversity Impact  ✓ 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute to
improved outcomes for communities as outlined in the following Council Plan strategic
priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following local
Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population   
6.3  Policy and Legal 
The Council has statutory responsibilities to meet educational needs, the needs of children
and young people in need and those it looks after  
6.4  Financial 
The financial information is set out in Tables 1 and 2 of this report. The spend at 31 March
2025 is £12,826,000 against a budget to date of £13,267,000 giving an underspend of
£441,000, including planned efficiency savings of £242,000, which arises mainly due to
vacancies and appointments of staff lower in the salary scale in addition to the other points
noted in this report 
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend this
Year
Virement
From
Other
Comments       
Annually Recurring Costs:
Page 304

Page 305

Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments       
6.5  Risk 
Budget Managers are aware of their responsibilities for managing budget allocations and
approval for any variances will be sought from Committee in line with Financial Regulations.  
6.6  Staffing 
There are no staffing implications associated with this report.  
6.7  Best Value and Transformation 
There are no best value and transformation implications associated with this report  
6.8  Property 
There are no property implications associated with this report.  
6.9  Information Communications/Technology/Digital 
There are no Information Communications/Technology/Digital implications associated with
this report.  
6.10  Equalities, Social Inclusion and Economic Impact 
An Equality Impact Assessment is not needed because the report is to inform the
Committee on budget monitoring.  
6.11  Climate Change and Biodiversity Impacts 
No climate change and biodiversity impacts arise directly from this report. 
CONSULTATION  
7.1  This report has been prepared in consultation with Accountancy who have provided the
financial information that has been incorporated into the report. 
BACKGROUND PAPERS  
8.1  None 
Page 305

Page 306

Page 306

Page 307

Report to: Education, Children’s and
Leisure Services
Committee
Meeting Date: 13 May 2025      
Report by: Depute Chief Executive
(Education, Communities
and Organisational
Development
Report No: EDU024/25/NS      
Author: Neil Stables Contact Email: performance@moray.gov.uk 
Subject: Performance Report (Education) – Period to March 2025 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to scrutinise performance in areas of Service Planning, Service
Performance and other related data to the end of March 2025 and note actions being taken
to improve performance where required.  
1.2  This report is submitted to Committee in terms of Section III (A) (4) of the Council’s Scheme
of Administration to monitor performance in accordance with the Council’s Performance
Management Framework.  
2.  SUMMARY  
2.1  At the end of March 2025, overall progress against the 2024/25 Service Plan was 94%
complete.  Unlike other services’ Service Plans, the Education plan has several actions
aligned with School Term as an alternative to quarters, as such a number of actions have a
completion date of June 2025.  Progress against Service Plan Priorities and Indicators and
operational Service Performance Indicators is presented in the table and charts below – 
Item 23.*
Page 307

Page 308

3.  RECOMMENDATIONS  
3.1  It is recommended that Committee:   
i)  scrutinises performance in areas of Service Planning, Service Performance
and other related data to the end of March 2025 and note actions being taken to
improve performance where required.   
Neil Stables
Research & Information Officer 
4.  BACKGROUND AND CONTEXT  
4.1  Each service plan sets out the planned strategic and service level priorities and outcomes it
intends to deliver in the coming year aligning closely with financial planning, corporate and
community planning partnership strategic priorities.   
4.2  Progress on Service Plan priorities and outcomes and key areas of operational performance
is reported by exception, highlighting successes and giving assurances around the
challenges and actions to support.  Links to Service Plan Actions and Performance
Indicators can be accessed within the background papers section of this report.  
4.3  Complaints are reported in terms of time taken to respond, outcomes and learning points. 
Due to the scheduling of this committee, only complaints covering Quarter 3 (October to
December 2024) are being presented.  Links to Complaints tables can be accessed within
the background papers section of this report. 
Page 308

Page 309

4.4  Latest Local Government Benchmarking Framework (LGBF) results for 2023/24 are
published throughout the year with final results publication and data refresh in June.  The
full suite can be viewed via the LGBF Dashboard.  Published indicators for this service have
been incorporated with the relevant section of this report depending on whether used to
evidence progress against strategic, service level or service performance priorities.  LGBF
indicator targets and Red/Amber/Green (RAG) status in the backing tables is now based on
ranking thresholds aligning with exception reporting. 
4.5  The Sustainable Development Statement was approved by the Corporate Committee on 5
November 2024 (para 16 of the Minute refers).  The Statement draws out the way in which
sustainable development is embedded in the Corporate Plan 2024-29 and wider corporate
policies, strategies and plans with progress being reported through several updates and
reports, one of which is Quarter 4 performance reporting.  Service Plan actions and
indicators that underpin the delivery of Sustainable Development Goals are highlighted in
backing table documents and comment where relevant is incorporated in this report.  An
overview of progress will be presented in the Corporate Plan progress update. 
4.6  As this is the final quarter for delivery of actions in this service plan, any actions that are not
completed will be considered for carry forward into the 2025/28 service plans which are
also on the agenda for consideration by this Committee.  For a number of work areas these
are long standing commitments that will develop over time and carry over a number of
service plans as noted in the updates below. 
5.  PROPOSALS  
Successes – Service Plan Strategic & Service Level Outcomes and operational Service
Performance
5.1  Work has continued during the academic year around early intervention addressing whole
family well-being to ensure that children can reach their full potential.  Early Learning
Centres (ELC) have focused on supporting pre-school children, targeting key interventions
as part of transition planning for entering Primary 1.  Wider Peer Early Education Partnership
(PEEP) sessions, where parents and carers are supported in their role as their children’s first
and most important educators, are also being reviewed as part of Moray Council contract
with Action For Children.  Across Primary and Secondary schools performance monitoring
continues with universal and targeted visit programme to schools, supporting early
intervention and actions for improvement.  The service continues to be data led, collecting
early indication data for Primary and Secondary in order to strengthen support and
challenge visits and performance monitoring for in-year improvements. Scrutiny around
wider contextual and pupil data continues in secondary, with additional funding including
Attainment Scotland Funds, Strategic Equity Funding targeted following school approach
for additional funding. (Action EDU 2024-25 STRA 1.1) 
5.2  There is continued reporting to Committee on performance and key actions underway to
ensure we get it right for every child.  Family Improvement Group activities are realising
improvement through good practice sharing and focus on improving standards, raising
attainment and achievement through targeted work and interventions.  Education Strategic
meeting focus this session on leadership of change has further enabled schools and ELC
Page 309

Page 310

settings to look inwards, outwards and forwards in planning for improvement. (Action EDU
2024-25 STRA 1.2) 
5.3  The Literacy Strategy has been approved by Local Negotiating Committee for Teachers
(LNCT) and is being presented as a separate item on this Committee agenda with the aim
that schools will adopt the Strategy in line with their own self-evaluation processes in
session 2025/26. The Numeracy Strategy is being presented to LNCT in May and will
presented to this Committee in due course. The Quality Assurance and Moderation Support
Officer (QAMSO) Network is continuing to engage with the Assessment and Moderation
Roadmap and Toolkit and have focussed on high quality assessment.  The final meeting of 
the term, a school will showcase their approach to tracking, high quality assessment and
their assessment overview. The final meeting of the session will focus on using a range of
evidence for achievement of a level. (Action EDU 2024-25 LTA 1.3) 
Challenges and actions to support – Service Plan Strategic & Service Level Outcomes
and operational Service Performance
5.4  Senior Phase course options processes are nearing completion with timetable construction
underway for the new session.  Within resources available, schools are continuing to review
curriculum offer for Senior Phase and introducing e.g. Foundation Apprenticeships, where
appropriate.  Short-life working groups involving Secondary Head Teacher representatives
and the Quality Improvement Manager have worked together to further develop consortia
approaches and Foundation Apprenticeship offer in schools, with a pilot next session with
identified Foundation Apprenticeship opportunities (self-funded by schools) and consortia
at SCQF level 7 offer for Senior Phase (S6) pupils.  
The average tariff points achieved in 2023/24 by Moray school leavers was 831, below the
national average (918) and the benchmarking family average (874), ranking Moray in the
bottom quartile of Scottish local authorities.  The number of qualifications and units
available for young people to complete does vary significantly due to the number of
different curriculum structures there are across Scotland, and as such care has to be taken
in comparing performance.  The development of the curriculum offer in Moray through
increased subject, course and accreditation options for senior phase should see an
increase in the tariff points achieved by pupils.  Further analysis on 2023-24 school leavers’
attainment is also provided to this Committee by the Quality Improvement Manager, with
the Analysis of Secondary School Leaver Attainment 2023-24 report.  (Action EDU 2024-25
CUR 1.2 and PI CHN12a, EdS413.12) 
5.5  The Additional Support Needs (ASN) review continues with work progressing within key work
areas including allocations review, further moderation activities and development of the
ASN handbook and wider training activities well underway.  The Supporting all Learners
strategy will be realigned to incorporate key changes, with ongoing Social, Emotional and
Behavioural Needs (SEBN) change management and wider local authority management
restructure ongoing at this time.  Progress with Flexible Learning Resource (FLR) and Moray
Adapted Curriculum (MAC) has been hindered by significant staff absence, this is due to
staff being required to cover in secondary enhanced provision, and the lack of capital spend
available to complete work in MAC/FLR East. The decision has been taken to progress to
recruitment and to work the FLR model peripatetically in Moray East and West. (Actions
EDU  EIO 1.2 and ASN 1.1) 
5.6  The proportion of funded early years provision which is graded good/better fell slightly to
84.1% (LGBF indicator), ranking Moray in the bottom quartile of local authorities at 28th. 
Page 310

Page 311

The increase to 1140 hours has brought significant challenges around securing a quality
workforce, and supporting a high level of staff absence, whilst simultaneously maintaining
and improving the quality. The challenges are faced nationally, and Moray continues to
experience a limited number of qualified workforce coming through further and higher
education.  Early years provision that is not reaching grade 4 (good or better) receive
support from the respective Continuous Improvement Officer and the Early Years Teaching
and Learning Teacher to address the required actions resulting from recommendations or
requirements.  Services that have remained grade 4 or below for a significant period of time
are in action planning periods which may move to 3 month, time fixed, service improvement
periods if significant development is not achieved.  The focus going forward will remain on
improving quality of leadership, learning, teaching and assessment, as well as support to
develop self-evaluation processes leading to change. (PI CHN18) 
5.7  The percentage of P1, P4 and P7 pupils combined achieving expected Curriculum for
Excellence (CFE) Levels in Literacy and Numeracy made further improvement to 70.6% and
76.5% respectively, exceeding Stretch Aims targets and gaining ground on national
averages.  However Moray continue to rank in the lowest quartile of Scottish local
authorities for both literacy and numeracy.  Ongoing work to build and maintain
improvement is detailed in the Initial Analysis of Achievement of Curriculum for Excellence
Levels 2024 submitted to this Committee on 18 February 2025 (para 11 of the minute
refers).  (PIs CHN13a and CHN13b) 
5.8  The percentage of leavers entering positive destinations fell to 93.8% in 2023/24, dropping
into the lowest quartile of Scottish local authorities.  Both national (95.7%) and family
benchmarking group (95.2%) averages decreased albeit to a lesser extent.  Further analysis
on 2023-24 school leavers positive destinations is also provided to this Committee by the
Quality Improvement Manager, within the Analysis of Secondary School Leaver Attainment
2023-24 report.  (PI CHN11) 
Complaints and MP/MSP Enquiries
5.9  A total of 18 complaints were received during the period October to December 2024, with
10 complaints being closed.  Of those closed, four were at frontline stage (40%) and six at
investigative stage (60%). Only two complaints were partially upheld, with the other eight
not upheld.  One partially upheld complaint related to bullying issues at a school, where the
school acknowledged the anti-bullying policy had not been fully adhered to, apology was
given and additional measures have now been introduced. The other related to a delay in
the school informing parent of an incident at school, apology given and communication
processes reviewed.  While no frontline complaints were upheld, the average time taken to
respond was 13 days, with none of the complaints responded to within the 5 day target. 
Investigative complaints took 24 days on average for a response to be sent, while behind
target (20 days) this was an improvement on the 38 day average in the previous quarter. 
Other Performance (not included in the Service Plan)
5.10  Nothing to report 
Consultation and Engagement
5.11  Nothing to report 
6.  SUMMARY OF IMPLICATIONS  
Page 311

Page 312

6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) X 
Policy and Legal  X
Financial  X
Risk  X
Staffing  X
Best Value and Transformation X 
Property  X
Information Communications Technology/Digital  X
Equalities. Social Inclusion and Economic Impact   X
Climate Change and Biodiversity Impact  X 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute to
improved outcomes for communities as outlined in the following Council Plan strategic
priorities:
☒ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following local
Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☒ Improving wellbeing of our population 
6.3  Policy and Legal 
The Council has a statutory requirement to publish a range of information that will
demonstrate that it is securing best value and assist in comparing performance both over
time and between authorities where appropriate.  
6.4  Financial 
None arising from this report. 
6.5  Risk 
None arising from this report.  
6.6  Staffing 
None arising from this report.  
Page 312

Page 313

6.7  Best Value and Transformation 
How Councils plan for, manage and report on performance is a key area of focus in external
audit work, particularly on Best Value.  
6.8  Property 
None arising from this report.  
6.9  Information Communications/Technology/Digital 
None arising from this report.  
6.10  Equalities, Social Inclusion and Economic Impact 
None arising from this report.  
6.11  Climate Change and Biodiversity Impacts 
None arising from this report. 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with the Head of Education and relevant
Service Managers and any comments made have been incorporated into the report. 
8.  BACKGROUND PAPERS  
8.1  Council’s Performance Management Framework
Service Plan Actions
Service Plan Performance Indicators
Service Performance Indicators
Service Complaints 
Page 313

Page 314

Page 314

Page 315

Report
to:
Education, Children’s and
Leisure Services
Committee
Meeting Date: 13 May 2025      
Report
by:
Depute Chief Executive
(Education, Communities
and Organisational
Development)
Report No: EDU023/25/IS      
Author: Iain Sneddon Contact Email:  performance@moray.gov.uk 
Subject: Performance Report (Education Resources and Communities) – Period to
March 2025 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to scrutinise performance in areas of Service Planning,
Service Performance and other related data to the end of March 2025 and note actions
being taken to improve performance where required.  
1.2  This report is submitted to the Committee in terms of section III (A) (4) of the Council’s
Scheme of Administration to monitor performance in accordance with the Council’s
Performance Management Framework. 
2.  SUMMARY  
2.1  The report identifies the progress of Service Plan Actions and Performance Indicators
highlighting areas of good progress and areas where there have been challenges.
Mitigations and actions taken to address challenges are detailed within the body of the
report. 
The Service Plan was designed as a 3-year Service Plan (2024-27) with many actions due for
completion after 31 March 2025. At the end of March, Service Plan actions are 54%
complete and with most actions progressing well. Four Service Level actions completed
within 2024-25. One Strategic and two Service Level actions did not complete by due dates.
Two Strategic actions will be removed from the 2025-28 plan to reflect the reduction in
resource to deliver on Participatory Budgeting (PB) projects and the deferment of the
Findrassie Primary school project. 
Item 24.*
Page 315

Page 316

3.  RECOMMENDATIONS  
3.1  It is recommended that Committee:   
i)  Scrutinises performance in areas of Service Planning, Service Performance
and other related data to the end of March 2025 and note actions being taken
to improve performance where required.   
RAG
Take a partnership approach to locality planning in
priority areas of Moray to enable people to
influence services and develop community action
43%
Tackle the affordability and standard of our learning
estate to ensure sustainability while meeting
climate requirements
36%
YOUTH WORK - deliver targeted work in each
secondary supporting employability skills and a
positive transition from secondary school into
college, work or training for identified young people
50%
COMMUNITY EDUCATION 100%
TRANSFORMING SERVICES - Sport & Leisure,
Libraries, Learning Centres & Heritage, Music
Instruction & Performance service provision to
ensure a sustainable council for the future .
73%
SUSTAINING ASSETS - Sport & Leisure, Libraries,
Learning Centres & Heritage, Music Instruction &
Performance service provision to ensure a
sustainable council for the future
57%
HEALTH & WELLBEING 75%
GROWTH DEAL SUPPORT - Sport & Culture
Service support relevant projects connected to the
Moray Growth Deal, Long Term Town Plan and any
other relevant major funding streams
50%
ADDRESSING INEQUALITIES -Active Schools &
Community Sport and Libraries, Learning Centre &
Heritage deliver targeted work across Moray to
help reduce child poverty and inequalities in health
& education
87%
BUSINESS ADMIN REVIEW - Development and
Implementation 46%
54%OVERALL PLAN PROGRESS
Comment
Data not available - Data not yet published or unavailable due to reporting
timescales.
Q4 2024/25 - Progress in two areas of the plan, identified in yellow above are
behind expected progress at this stage of the plan.
STRATEGIC
LEVEL
SERVICE
LEVEL
SERVICE PLAN PRIORITIES (Q4 2024/25)
12
3
7
13
6
SERVICE PLAN PI'S (Q3
2024/25)
Achieving Target Within Target
Below Target Data Only
Data not available
41
Page 316

Page 317

Iain Sneddon
Research & Information Officer 
4.  BACKGROUND AND CONTEXT  
4.1  Each service plan sets out the planned strategic and service level priorities and outcomes
it intends to deliver in the coming year aligning closely with financial planning, corporate
and community planning partnership strategic priorities.   
4.2  Progress on Service Plan priorities and outcomes and key areas of operational
performance is reported by exception, highlighting successes and giving assurances
around the challenges and actions to support.  Links to Service Plan Actions and
Performance Indicators can be accessed within the background papers section of this
report.  
4.3  Complaints are reported in terms of time taken to respond, outcomes and learning points. 
Links to Complaints tables can be accessed within the background papers section of this
report. 
4.4  Latest Local Government Benchmarking Framework (LGBF) results for 2023/24 are
published throughout the year with final results publication and data refresh in June.  The
full suite can be viewed via the LGBF Dashboard.  Published indicators for this service
have been incorporated with the relevant section of this report depending on whether
used to evidence progress against strategic, service level or service performance
priorities.  LGBF indicator targets and Red/Amber/Green (RAG) status in the backing tables
is now based on ranking thresholds aligning with exception reporting.  
4.5  The Sustainable Development Statement was approved by the Corporate Committee on 5
November 2024 (para 16 of the Minute refers).  The Statement draws out the way in which
sustainable development is embedded in the Corporate Plan 2024-29 and wider corporate
policies, strategies and plans with progress being reported through several updates and
reports, one of which is Quarter 4 performance reporting.  Service Plan actions and
indicators that underpin the delivery of Sustainable Development Goals are highlighted in
backing table documents and comment where relevant is incorporated in this report.  An
overview of progress will be presented in the Corporate Plan progress update in due
course. 
4.6  As this is the final quarter for delivery of actions in this service plan, any actions that are
not completed will be considered for carry forward into the 2025/28 service plans which
are also on the agenda for consideration by this Committee.  Specific points for carry
forward are noted in the updates below. 
5.  PROPOSALS   
Successes – Service Plan Strategic & Service Level Outcomes and operational
Service Performance
5.1  Results for performance indicators and complaints relate to the period to the end of
Quarter 3 2024/25, updates for Service Plan actions to the period to the of end of Quarter
4 2024/25.  
Page 317

Page 318

5.2  The ‘Moray Multiply’ programme completed in quarter 4 as anticipated. A coordinated
approach was taken with all partners contributing to the success of the programme.  Many
projects took place during the programme duration to improve the literacy and numeracy
of adult learners. The University of Highlands and Islands (UHI) developed a suite of online
learning materials that anyone can access and over 20 local staff have been trained by
National Numeracy as Numeracy Champions and the libraries service have trained a
further four members of staff. Although the funding period has ended, it is anticipated
work to a lesser degree will continue. Action SERV ERC 2 24-27  
5.3  All budget savings identified during 2024/25 have been implemented. Changes to the
Youth Music Initiative programme were implemented allowing it to remain within budget.
Additional Leisure Services income generation is likely to meet target by the end of Quarter
4. As of Quarter 3, income generated had increased by £14,170 in comparison with the
same period of 2023/24. Action SERV ERC 3.4 24-27, PIs ERC018, ERC018a  
5.4  Work to embed the ‘Changing Lives’ approach has been achieved and is evident
throughout workstreams connected to the adaptive curriculum model, mental health and
disability thematic hubs and digital learning opportunities. The Sports and Culture service
has signed up to and will follow the Scottish Action for Mental Health (SAMH) Charter as
part of its commitment across all four teams. Now fully embedded, the approach will
continue and be led by Active Schools and Community Sports in future years. The number
of participants involved with the programme over the first three quarters of 2024/25 are
significantly higher than numbers seen in the corresponding quarters of 2023/24. Action
SERV ERC 7.1 24-27, PI ERC021 & 021a  
5.5  Absence management procedures are fully adhered to within the service and emphasis
has been applied to the importance of following procedures. Service absences have
increased each quarter during 2024/25, from 2.25% in Q1 to 2.96% at the end of Quarter 3,
however service absences continue to remain significantly below the Moray Council
average of 6.32%. Action SERV ERC 9 24-27, PI ERC057a   
Challenges and actions to support – Service Plan Strategic & Service Level Outcomes
and operational Service Performance
5.6  The removal of PB support posts from the service has led to this action not progressing. 
Ongoing work including elements of PB will continue to receive support from within the
service, but no new work will be undertaken. This action will not be included within the
2025-28 Service Plan. Action STRAT ERC 1.1 24-27  
5.7  The design and construction review of Findrassie Primary School will make no further
progress after the approval of a 4-year deferment. The action will be removed from the
2025-28 Service Plan. Action STRAT ERC 2.1 24-27  
5.8  School census data forecasts a further reduction in pupil numbers across the Elgin High
School Associated School Group (ASG) area showing long-term capacity extension is not
required at this stage. The level of need will remain under review. Short-term capacity
management at Greenwards Primary school is to be assessed. No further progress will be
made until later in 2025/26 after a review of methodology in school roll forecasting. The
action will be included in the 2025-28 Service Plan with a new completion date of 31
March 2027. Action STRAT ERC 2.9 24-27  
Page 318

Page 319

5.9  The libraries change management plan to redesign the libraries service, incorporating
savings, has paused after decisions made at Full Council on 26 February 2025 (para 3 of
minute refers). The plan is to be revised and new proposals, along with elements within
the current plan, are scheduled for August 2025 following a review of opening hours of
library facilities. This action will be carried forward in the 2025-28 Service Plan with a
completion date of 31 March 2026.  Local Government Benchmarking Framework reported
the cost per library visit had decreased to £5.44 due to a proportionately greater increase
in the number of library visits to net expenditure.  Results ranking remains in the lowest
quartile.  Results nationally range significantly suggesting variation in calculations
methods.  Action SERV ERC 3.1 24-27 PI C&L02  
5.10  With the outcome of the Sport and Leisure asset review not yet determined, this action
has made little progress during 2024/25. It was anticipated that findings would be
presented during Quarter 4, but this has now been extended with a date during the first
half of 2025/26 now expected. This action will be carried forward in the 2025-28 Service
Plan with a completion date of 31 March 2026.  There continues to be a cumulative
decrease in admissions for leisure services due to closure of Elgin Community Centre. 
Action SERV ERC 3.2 24-27 PI ERC018b  
5.11  The Business Administration change management review for Secondary schools has
made slow progress during 2024/25. A number of staffing issues have hindered progress.
Recent recruitment to the temporary post to support the review will provide more capacity
to progress. In addition to elements identified within the original Primary School review,
areas relating to the use of technologies within schools will be included within the
Secondary School review and included in the 2025-28 service plan. SERV ERC 8.1 24-27  
5.12  The proportion of adults satisfied with museums and galleries is measured over a rolling 3-
year period and is taken from the Scottish Household Survey.  Between 2021 and 2024,
57% of adults were satisfied, placing Moray 26/32 nationally and lowest in its comparator
group of eight authorities.  Due to budgetary constraints, operation of Moray Museum
Services ceased on 1st April 2020 and the Falconer Museum with Store is closed until an
alternative service model is established.  The collection continues to be monitored and
the buildings maintained. PI C&L05c   
Complaints and MP/MSP Enquiries
5.13  Four complaints were closed during Quarter 3 (three Frontline & one Investigative) with
just one complaint being partially upheld. Of the six complaints received five were
regarding Leisure services for four different facilities and one generalised complaint. 
Average response time for Frontline complaint was 9 days and Investigative complaint was
22 days against 5 and 20 working days target respectively.   
Case Studies
5.14  Nothing to report   
Consultation and Engagement
5.15  A further three Sustainable Learning estate surveys were carried out between September
2024 and March 2025 (Keith, Speyside and Milnes). A total of 762 responses were received
and analysis has been provided for all. The final ASG survey (Lossiemouth) closed on 31
March 2025, with analysis due to be undertaken. It is planned to compare findings from all
surveys to identify variances within Moray
Page 319

Page 320

6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) X 
Policy and Legal  X
Financial  X
Risk  X
Staffing  X
Best Value and Transformation X 
Property  X
Information Communications Technology/Digital  X
Equalities. Social Inclusion and Economic Impact   X
Climate Change and Biodiversity Impact  X 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☒ Improving wellbeing of our population   
6.3  Policy and Legal 
The Council has a statutory requirement to publish a range of information that will
demonstrate that it is securing best value and assist in comparing performance both over
time and between authorities where appropriate.  
6.4  Financial 
There are none arising from this report. 
6.5  Risk 
There are none arising from this report.  
6.6  Staffing
Page 320

Page 321

There are none arising from this report.  
6.7  Best Value and Transformation 
How councils plan for, manage and report on performance is a key area of focus in
external audit work, particularly on best value.  
6.8  Property 
None arising from this report.  
6.9  Information Communications/Technology/Digital 
None arising from this report.  
6.10  Equalities, Social Inclusion and Economic Impact 
An Equality Impact Assessment is not required as this report is to inform the Committee
on performance.  
6.11  Climate Change and Biodiversity Impacts 
None arising from this report. 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with the Deputy Chief Executive (Education,
Communities & Organisational Development), Service Managers, and Caroline O’Connor,
Committee Services Officer and any comments made have been incorporated into the
report 
8.  BACKGROUND PAPERS  
8.1  Service Plan Actions
Performance Indicators (Q3 2024/25)
Service Performance Indicators (Q3 2024/25)
Service Complaints (Q3 2024/25) 
Page 321

Page 322

Page 322

Page 323

Report to:  Education, Children’s and
Leisure Services
Committee
Meeting Date: 13 May 2025      
Report by: Depute Chief Executive
(Education, Communities
and Organisational
Development)
Report No: EDU017/25/VC/AMB      
Author: Denise Whitworth /
Vivienne Cross 
Contact email: education@moray.gov.uk  
Subject: Education, Communities and Organisational Development Service Plans
2025/28: Education and Education Resources and Communities 
1. PURPOSE 
☒  For Decision    ☐  For Information 
1.1 To invite the Committee to consider the Education and Education Resources and
Communities Service Plans for 2025-2028.  
1.2 This report is submitted to Committee in terms of Section III (A) (4) of the Council’s
Scheme of Administration relating to monitoring performance of the services within the
Committee’s remit in accordance with the Council’s Performance Management
Framework. 
2. SUMMARY  
2.1 Service Plans have been prepared identifying the improvement targets for 2025/28.  In
preparing the plans, managers have taken account of risk, performance data, the LOIP, the
Corporate Plan and other relevant factors such as audit and inspections outcomes.  The
Service Plans also identify the resources allocated to each service. 
3. RECOMMENDATIONS  
3.1 It is recommended that Committee:   
i) consider and approve the Service Plan for Education for the year ahead in
Appendix 1; 
ii)  consider and approve the service plan for Education Resources and
Communities for the year ahead in Appendix 2; and
Item 25.*
Page 323

Page 324

iii) notes the workforce themes that have emerged from departmental workforce
planning as highlighted in paragraph 6.6   
Denise Whitworth     Vivienne Cross
Depute Chief Executive    Head of Education  
(Education Communities and Organisational Development) 
4. BACKGROUND AND CONTEXT  
4.1 Service planning is a key aspect of the Council’s Performance Management Framework
and is undertaken annually to set out the strategic direction for services over the coming
months.  
4.2 It should be noted that actions from the Best Value Action Plan, agreed by the Corporate
Committee on 23 April 2024 (para 6 of the minute refers) will be monitored and reported
out with the Service Plan process.  
4.3 The service planning process focuses on forward planning for medium-term activities
supporting delivery of the Local Outcomes Improvement Plan (LOIP) and Corporate Plan. 
The Council planning process also includes team plans that focus on short term tactical
and operational activities supporting delivery of the Service Plan and strategies and
Employee Review and Development Plans (ERDP) and Professional Review and
Development (PRD) plans provide individual planning for employees’ activities and
development.    
4.4 As well as identifying service developments and improvements, the Service Plan
Framework requires an assessment of the output and outcome requirements for services
based on the Council’s priorities, statutory and regulatory requirements and other relevant
local and national direction and makes use of improvement tools for planning and
continuous improvement.  Tools include the National Improvement Framework (NIF); How
Good is Our (HGIO) Education Authority; How Good is Our Community Learning and
Development; How Good is Our Culture and Sport and where there is no HGIO framework,
services are planning to support their improvement work with the Public Sector
Improvement Framework, which the Council is in the process of re-invigorating for relevant
services. Across services, priority outcomes are those included in the Council’s Corporate
Plan 2024-2029 that directly relate to the service or are influenced by the service and
should be clearly identified.    
4.5 Setting clear measurable outcomes and defining key indicators by which progress will be
assessed continues to be an area for development within the Council. However, it is
recognised that for some actions it can be difficult to identify a measurable outcome (e.g.
a change in legislation that must be implemented or updating a policy framework).
Therefore, as far as possible efforts have been made to set measurable outcomes for
service plan actions but in some cases outputs and key progress milestones have been
used so that it is still possible to measure whether the action has been progressed as
intended. 
4.6 A summary of progress is given below for each of the services based on the performance
monitoring carried out throughout the year by the services and reported to committee as
part of performance reporting.  Further information on performance at the end of Quarter 4
Page 324

Page 325

is included in the service Performance Reports that are also on the agenda of this
Committee.  The Performance reports note where there is a carry forward of actions from
the previous service plans into the 2025/8 plans. 
4.7 It should be noted that while there will be some re-organisation of teams and alignment of
services as a result of the management restructure, service plans have been prepared
taking account of council priorities, national priorities and ongoing and emerging service
priorities.  Therefore, it remains appropriate to seek approval for the annual refresh of
service plans to ensure that they continue to reflect the next iteration of priorities and
direction from committee and that services are appropriately directed and tasked.  
5. PROPOSALS 
EDUCATION SERVICE 
5.1  The focus of the plan is for 2025-26 although the service has set high level priorities for a
three year period 2025-28 with actions being reviewed annually.  The service also sets a
strategic theme linked to the plan where this has been Learning, Teaching and Assessment
in 2022/23, Inclusive Practice in 2023/24 and the current year 2024/25 has had a focus on
Leadership of Change. Strategic meetings and activities are linked to the theme with good
practice shared locally and a range of speakers from across Scotland presenting.  The
Education Consultative group (with a number of Head Teachers, Nursery managers and
officers representing the service) have agreed that the theme for 2025/26 is to allow time
to reflect, evaluate and embed the learning from the last 3 years in practice as well as to
embed the new service vision and values ‘Moray – Growing Together’.  
5.2  A summary of progress is given below based on the annual reviews carried out for each of
the service areas.  
5.3  Progress on planned work (success)
• The continued pace of progress with the Additional Support Needs (ASN) review in
almost all priority areas to ensure that the service has a clear focus on inclusive
practice and supporting learners.  This has been reported to Committee regularly
• Continued improvements in Achievement of Curriculum for Excellence levels with next
steps identified including a growing number of schools being involved in the National
Children and Young People’s Improvement Cycle (CYPIC) work on literacy (writing)in
Primary 4
• The development of the Moray Literacy Strategy, reported separately to Committee and
work on curriculum progressions and moderation
• Improvements in attendance following intensive quality assurance visits to schools
and the continued use of AnalyseM which is strengthening approaches to tracking and
monitoring pupil progress and achievement in key measures
• The initial pilot and roll out of AnalyseM in secondary and development of Primary
Warehouse to host data and reviewed ‘readiness for school improvement and
inspection’ guidance and approaches
• The increasing number of positive Early Learning and Childcare (ELC) and Primary
school inspections.
• The work with ELC services, both local authority and private funded providers, around
Self-evaluation through contract monitoring.
• Continued improvements in Information sharing between Health and ELC’s in relation
to children under 5. This supports with more timely interventions and understanding of
need prior to starting in ELC.
Page 325

Page 326

• The development of the Moray Quality Improvement Framework  
5.4  Progress on planned work (areas for development/not delivered)
Planned work where progress has been slower than planned, due to staff absence and
staff redeployed to support the wider system included: 
• Policy development linked to the ASN review and setting up the Flexible Learning
Resources (FLRs)
• Continue to raise attainment, particularly across the senior phase  
5.5  Planned focus in new plan (reflecting above and challenges to come)
There continues to be a rigorous and sustained emphasis on the council priority of raising
attainment within the refreshed service plan.  This carries through the actions and drives
forward the corporate priority of our young people growing up well educated and reaching
their full potential. 
• Focus on equity and improving outcomes for all 
• Further progress the ASN review with focus on learners by embedding inclusive
practice across Moray
• Further develop the curriculum – senior phase offer, project based learning,
embedding of early years progressions and developing tracking 
• Embed work to improve learning, teaching and assessment 
• Continued focus on leadership of change 
• Further develop the Moray Quality Improvement framework to improve approaches to
support and challenge
• Continued development of data strategy and dashboarding including Primary
Warehouse development, strengthening data literacy across our system
• ASN moderation in ELC requires further work to reflect both additional needs and
context of settings. Ongoing work with short life working group (SLWG) to ensure
financial support is more effective whilst remaining in budget.
• Shared framework between Care Inspectorate and Education Scotland, for ELC, will
roll out in August 2025 and the majority of ELC settings will require support to reflect
changes. 
5.6  The Education service plan is attached in Appendix 1 
EDUCATION RESOURCES AND COMMUNITIES 
5.7  Progress on planned work (success) 
• The Dandelion project to support military families in Moray has progressed well and
been recognised as good practice that is being shared with others 
• The ‘Moray Multiply’ programme, which was funded through the UK Shared Prosperity
Fund with the aim of support numeracy skills completed on31 March as anticipated. A
coordinated approach was taken with all partners contributing to the success of the
programme 
• Status of learning estate design and construction projects has been kept under active
review to ensure spend is aligned to future need (Findrassie Primary and Elgin High
School)
• The learning estate strategy has continued to be deployed through engagement across
Moray with parents and communities on the future of schools in Moray and all
Associated Schools Groups are scheduled to be complete by the end of June term.
• Decisions on proposals for the future of Crossroads Primary school are well advanced
Page 326

Page 327

• Work to embed the ‘Changing Lives’ approach has been achieved and is evident
throughout workstreams connected to the adaptive curriculum model, mental health
and disability thematic hubs and digital learning opportunities
• The Sports and Culture service has signed up to and will follow the Scottish
Association for Mental Health Mental Health Charter for Physical Activity and Sport
which aims to improve health equality and reduce discrimination for anyone with a
mental health problem.  The charter encourages physical activity and sport to ensure
mental health and well-being are not barriers to engaging.  This is now fully embedded
across all four service teams and the approach will continue and be led by Active
Schools and Community Sports in future years
• All budget savings identified during 2024/25 have been implemented. Changes to the
Youth Music Initiative programme were implemented to reduce costs allowing it to
remain within budget.
• Direction on the future of Library services has been agreed and work is underway to
work with communities on ensuring this is aligned to local need 
5.8  Progress on planned work (areas for development/not delivered) 
• Business Administration reviews in Education HQ and Schools have not progressed as
planned due to difficulties in resourcing the projects.  Specific resource is now in
place and work is progressing and included in the service plan for reporting to
committee in October 2025. 
• Actions to support the delivery of Participatory Budgeting (PB) with council and
partner services has not progressed due to the staffing changes following budget
savings. Although no PB specific work took place in the first two quarters engagement
was undertaken with community councils consulting on the new Scheme of
Establishment. In addition, twelve Community Council’s took part in a sub-group
session to review the formula for the small Admin Grant allocated to each active group  
5.9  Planned focus in new plan (reflecting above and challenges to come)   
The Education Resources and Communities service plan attached at Appendix 2 outlines
the service definition, resources, and planned improvements for the service from 2025-
2028. It emphasises enhancing community engagement, transforming services, and
developing the learning estate while addressing inequalities and improving health and
wellbeing. 
5.10  The Service plan actions take account of 4 key themes: 
Developing our Assets – taking a strategic approach to developing our learning estate,
including sport & culture assets 
Service transformation – reviewing service delivery to ensure we are meeting service user
needs in a sustainable way:
• Sport and Leisure
• Libraries, Learning Centres & Heritage
• Music Instruction 
Communities and Place – supporting our communities to build capacity and influence
decision-making that impacts on them and their local area. 
Page 327

Page 328

Working in partnership to achieve positive outcomes – with specific focus on poverty,
inequality and communities.  
5.11  The following are taken forward through particular actions in the service plan    
• Improvement Focus: Key areas for improvement include strategic asset
development, service transformation, and community capacity building, driven by
evidence from various reports and strategies.  
• Community Engagement: Plans to enhance community engagement through locality
planning and the development of digital platforms aim to empower residents to
influence local decision-making.  
• Learning Estate Sustainability: Addressing the condition and suitability of
educational facilities to ensure they meet future needs and climate requirements,
with specific projects outlined for completion by 2030.  
• Youth Work Initiatives: Targeted youth work programs aim to support employability
and health, facilitating positive transitions for young people from school to further
opportunities.  
• Transforming Services: A transformative approach to sport, leisure, and library
services is planned to ensure sustainability and improve community access to
resources, with specific milestones set for implementation.  
• Addressing Inequalities: Initiatives focused on reducing inequalities, particularly for
vulnerable groups, are highlighted, with commitments to develop targeted programs
addressing poverty and mental health.  
• Business Administration Improvements: A review of school business administration
aims to enhance efficiency and consistency across educational settings, leveraging
digital solutions.
5.12  The Education Resources and Communities service plan is attached in Appendix 2 . 
5.13  The service plans for Education and Education Resources and Communities, reflect the
current management structure within the Council and they will be adjusted at the next
annual review to reflect the new structure once in place. 
6. SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) ✓ 
Policy and Legal  ✓
Financial  ✓
Risk ✓ 
Staffing  ✓
Best Value and Transformation  ✓
Property  ✓
Information Communications Technology/Digital  ✓
Equalities. Social Inclusion and Economic Impact   ✓
Climate Change, Biodiversity and Sustainability  ✓ 
Page 328

Page 329

6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☐ Improving wellbeing of our population 
6.3  Policy and Legal 
There are no policy and legal implications arising from this report.  
6.4  Financial 
There are no financial implications arising from this report. 
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend this
Year
Virement
From
Other
Comments       
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments       
6.5  Risk 
There are potential risks around progress all priority areas due to staffing pressures and
absence within the system which often has an impact on officers, including those
supporting in schools or in settings.    
6.6  Staffing 
There are no staffing issues.  The service plan actions will be accommodated within
existing resources.   
The services have undertaken workforce planning to consider how best to prepare and
manage the workforce for the services to be able to respond to the agreed Council
priorities in the Corporate Plan and the service work that is required to support and
achieve those objectives.   Consideration has also been given to the Council  Workforce
Page 329

Page 330

Strategy and Plan priorities in a service context. The main themes emerging from service
workforce planning are listed below. 
The main themes arising from these include: 
• Building capacity and resilience, including leadership capacity 
• Change management and a workforce culture to support and enable change
• Health and Well-being management (including absence management)
• Recruitment and retention 
The services have considered these themes and included service workforce action in the 
service plan alongside the corporate action to improve health and well-being.   
6.7  Best Value and Transformation 
The service plans support the council to continue on its Best Value journey. Specific 
actions that support the best value action plan are contained against the heading: Take a
partnership approach to locality planning in priority areas of Moray to enable people to
influence services and develop community action.  
6.8  Property 
There are no property implications.  
6.9  Information Communications/Technology/Digital 
There are no information communications/technology/digital implications arising from
this report.  However, there is work set out within the workforce plans to ensure that the
workforce are ready and enabled for change, including digital skills.  The work on the
learning estate will also have specific actions to ensure that school buildings are digitally
enabled.  
6.10  Equalities, Social Inclusion and Economic Impact 
There are no equalities, social inclusion and economic impacts arising from this report. 
Actions within the Education service plan tackle poverty, closing the poverty related
attainment gap as well as a focus on children and young people with Additional Support
Needs.  Actions within the ERC service plan tackle inequality and social inclusion, such as
the work planned on sport and culture (action 8) library services (action 4) and the
community based action (actions 1 and 3) and economic impacts through actions related
to the Moray Growth Deal and Long Term Town Plan (action 7).  
6.11  Climate Change and Biodiversity Impacts 
There are no climate change and biodiversity impacts arising from this report.  The Leisure
service plans and actions include specific consideration of climate change and
biodiversity given that these services are high energy users (action 5.4) 
7. CONSULTATION  
7.1 This report has been prepared in consultation with the service managers in Education and
Education Resources and Communities services and the Education Consultative Group
and any comments made have been incorporated into the report. 
8. BACKGROUND PAPERS  
8.1 Nil
Page 330

Page 331

Page 331

Page 332

APPENDIX 1
EDUCATION SERVICE PLAN 
1. Service Definition:  Delivering Education across Early Learning and Childcare, Primary, Secondary Education and support
and challenge via a small central team of Officers
2. Service Resources: Service Resources: 939 fte teaching staff; 557.4 fte local government employees; Total 1496.4 FTE
Budget: DSM; Revenue Central Budget Early Years and Education and ASN £115m 
3. What have we identified for improvement in 2025/28 What evidence did we use to identify this improvement? 
Please add benchmark information wherever available and relevant to the
improvement.
Focus on equity and improving outcomes for all Attainment data including LGBF measures, Insight for Senior Phase and
Achievement of Curriculum for Excellence data
Attendance data
Exclusion data
Stretch aims for Scottish Attainment Challenge
HMIe and Care Inspectorate inspection results
Self-evaluation profiles
Risk matrix for school improvement
ICEA report and various Education reform reviews
Moray Quality Improvement Framework visit
Further progress the ASN review with focus on learners
Develop curriculum – senior phase offer, project based learning,
early years progressions and tracking
Continued focus on learning, teaching and assessment
Focus on leadership of change
Further improve approaches to support and challenge 
Page 332

Page 333

APPENDIX 1
EDUCATION SERVICE PLAN 
4. Strategic
Outcome or
Priority
Action  Planned Outcome Outcome
measures
Completion
target
Lead Priority Rating
(1 high 3 low
and 4 for
ongoing, 5 for
on hold)
(L) Building a
better future for
our children &
young people.
(CP) Tackle
Poverty and
Inequality
Early intervention addressing
whole family well-being to
ensure than children can
reach their full potential
Continue to improved
attainment at
both Broad General and
Senior Phase identified
through ACEL and
LGBF measures
Literacy and
numeracy
attainment gap
(P1, P4 and P7
combined –
percentage point
gap between the
least and most
deprived pupils
(LGBF CHN14a /
CHN14b) (Corp.
Plan) 
Percentage of
P1, P4 and P7
pupils combined
achieving
expected CFE
level in literacy
and numeracy
(LGBF CHN13a /
CHN13b) (Corp
Plan / Core
Stretch Aim)
June 2026 
June 2026
SMcL 
SMcL
1
1
(L) Building a
better future for
Getting it right for every child
so that we continue to
improve attainment for all
Improved attainment at
both Broad General and
Senior Phase identified
Percentage of
school leavers
gaining 5+
Feb 2026  SMcL  1 
Page 333

Page 334

APPENDIX 1
EDUCATION SERVICE PLAN 
our children &
young people.
(CP) Tackle
Poverty and
Inequality
through ACEL and
LGBF measures
awards at levels
5 and 6 (LGBF
CHN6 / CHN7)
(Corp Plan) 
Leavers
achieving 1+ @
SCQF Level 5 /
Level 6
(Core Stretch
Aim) 
Overall average
total tariff (LGBF
CHN12a) (Corp
Plan) 
Percentage of
pupils entering
positive
destinations
(LGBF CHN11)
(ASN leavers /
LAC leavers)
(Corp Plan) 
Annual
Participation
Measure
(Core Stretch
Aim) 
Feb 2026 
Feb 2026 
Feb 2026 
Feb 2026 
SMcL 
SMcL 
SMcL 
SMcL 
1
1
1
1
Page 334

Page 335

APPENDIX 1
EDUCATION SERVICE PLAN 
5. Service
Level
Outcomes or
Priorities
Action Planned Outcome Outcome
Measures
Completion
Target
Lead Priority
rating
Equity and
improving
outcomes for
all
Through renewed focus on
the Scottish Attainment
Challenge Logic Model with
specific regard to outcomes
at school/community and
regional levels
Continue to accelerate
progress towards core
outcomes and Stretch
Aims with focus on:
leadership, professional
learning, collaboration,
data and evidence, culture
and ethos, learning and
teaching, readiness to
learn and engagement
Meet stretch
Aims:
Increased
attendance
Reduced
exclusions
June 2026 SC/DD/LR 1
Continue to review the
Supporting All Learners strategy
in line with changes implemented
by ASN review and focus on
inclusive practice
Ensuring wellbeing,
equality and inclusion for
all learners
QI 3.1 ratings in
inspection or self-
evaluation
increase
June 2026 SMcL 2
Reviewing
Additional
Support
Needs
Review and evaluate alternative
curriculum offers
Better meet the needs of
learners with ASN 
QI 3.1 ratings
Improved
attainment for
those with ASN
June 2026 SMcL/DD/SC 1
Embed non-negotiable training in
practice
Inclusive practice is
evidenced across the
service
Inspection
Feedback
QA visit feedback
QI3.1 ratings
June 2026 JS/DD/CF 1
Continue to focus on attendance
including those on part-time
timetables
Increase attendance,
participation and
Attendance
improved for those
on parttime
June 2026 SMcL/JS/SC/DD.LS 1
Page 335

Page 336

APPENDIX 1
EDUCATION SERVICE PLAN 
engagement in learning for
all
Continue to review
attendance policy and
guidance
Develop tracking
processes  for those on
part-time timetables
timetables
Stretch aim met
Reduce Exclusions through well
planned partnership
interventions and approaches
Reduction in exclusions
particularly for care
experienced children and
young people
Stretch aim met
Improved
attainment for
CEC&YP
June 2026 LS 1
Expand information sharing work
with Health colleagues to
encompass all ASG’s
Greater knowledge of
children coming in to ELC’s
needs
More robust
information in ASN
forecasting tool
June 2026 HS/DD 2
Develop key messages for
supporting 0-5’s, and their
families, with communication
skills taking account of national
messages from SALT.
Improved understanding of
early communication
needs.
Improved offer of training
within Health, ELC and
SALT to support early
communication needs
80% Staff across a
variety of sectors
are confident in
supporting
children 0-5 and
their families with
communication
skills
June 2026 HS 2
Curriculum Further develop the curriculum in
the BGE and Senior Phase taking
account of the national review
and international research
including project based
learning
Improved curriculum offer
in line with national advice
School visit
evaluations
June 2026 SMcL 2
Further develop curriculum offer
in senior phase including
consortia arrangements
Increase in subjects,
courses and accreditation
Tarriff points  June 2026 SMcL 1
Page 336

Page 337

APPENDIX 1
EDUCATION SERVICE PLAN 
Learning,
Teaching and
Assessment
Continue to improve consistency
in high quality learning and
teaching
experiences for all
Improve quality of learning,
teaching and assessment
QI 2.3 evaluations June 2026 SMcL/HS 1
Ensure pace, challenge and
differentiation is improved to
improve learner progression
with greater focus on future
pathways
Improve quality of learning,
teaching and assessment
QI 2.3 evaluations June 2026 SMcL/HS 1
Continue to develop approaches
to assessment and moderation to
improve outcomes for learners
Improve quality of learning,
teaching and assessment
QI 2.3 evaluations June 2026 AB 1
Continue to support and improve
approaches to data
literacy for all staff to identify
and address achievement gaps
Improved ownership of
pupil progress across the
system
QI 2.3 evaluations June 2026 SMcL/HS 1
Leadership and
Empowerment
Ensure all establishments have a
shared vision and values of whole
school community, aspirational
and relevant, underpinning the
life and work of the school and
Curriculum
Ensure all establishments
have clear vision and
values linked with
curriculum rationale
VVA statements
Curriculum
rationales
June 2026 SMcL/HS 2
Continue to strengthen
leadership and
empowerment at all levels
Improve leadership QI 1.3 evaluations June 2026 WS 2
Continue to improve self-
evaluation for
improvement at all levels to
guide change and improvement
Improved self-evaluation
profiles leading to change
SE profiles June 2026 SMcL/HS 2
Increase opportunities to lead
learning by staff and pupils
Improve leadership of
learning
SIF evaluative
statements
June 2026 SMcL/HS 2
Page 337

Page 338

APPENDIX 1
EDUCATION SERVICE PLAN 
Support and
Challenge
Improvement
Embed our Moray
Quality Improvement Framework
(MQIF), and further support
Family Improvement Groups
across our schools in order to
strengthen peer support and
challenge of school
improvement, networking and
sharing of resources and good
practice
Improve support and
challenge across system
Inspection reports
SE profile gradings
June 2026 SMcL 2
Improve data literacy across the
service
Greater ownership of
improving outcomes for all
and evidence of use of data
to secure improvement
SIF reports from
inspection with
evidence to
support staff
taking greater
ownership of data 
School visit
evaluations
June 2026 SMcL 2 
Develop the use of the new
Quality Improvement Framework
across ELC establishments
Improve self-evaluation for
self- improvement across
ELC settings
Shared understanding of
new improvement areas
and how these will be
evaluated
SE profiles
SQRs
Contract
monitoring and
relating support
June 2026 HS 2
Health and
Wellbeing
Ensure revised operational
implementation of absence
management procedures are
applied by managers
Absence is managed
effectively and levels of
absence are reduced
efficiently and timeously
Reduction in
number of days
absence per
employee
June 2026 HoS 2
Page 338

Page 339

APPENDIX 1
EDUCATION SERVICE PLAN 
Workforce Plan Health and wellbeing
management (including absence
management)
Head Teacher wellbeing is
supported through offer of
professional supervision
and opportunity to access
learning sets through the
Mudd partnership 
Feedback from
cohorts will be
used to support
further
developments in
this area. 
Reduction in work
related stress from
HTs and reduced
absence
June 2026 HoS 1 
Page 339

Page 340

APPENDIX 2
EDUCATION RESOURCES AND COMMUNITIES SERVICE PLAN 
5. Service
Definition: 
EDUCATION RESOURCES & COMMUNITIES 
• Sport & Culture services, including Sport & Leisure facilities, Active Schools, Community Sports
programmes, Music Instruction and Performance Service, Library and Heritage services. 
• Business Support services for schools (including school administration) and central Education and
Education Resources & Communities
• Community Learning & Development functions, including the Community Support Unit, Youth Work and
Adult and Family Learning
• Learning Estate Programme
6. Service
Resources:
FTE: 157.41 FTE
Revenue Budget: £13,278,377
Capital Budget: £16m FOR 2025/26 over 3 years (Learning Estate budget plan allocation £12.166m; Sport &
Culture budget plan allocation is £3.841m) 
7. What have we identified for improvement in 2025-28 What evidence did we use to identify this improvement? 
Please add benchmark information wherever available and relevant
to the improvement.
Developing our Assets – taking a strategic approach to
developing our learning estate, including sport & culture assets
Condition & Suitability data
Learning Estate Strategy 2022-2032
Best Value Audit Report
Learning Estate Programme Definition Document
Moray Council Climate Change Strategy
Page 340

Page 341

APPENDIX 2
EDUCATION RESOURCES AND COMMUNITIES SERVICE PLAN 
Sport & Leisure Capital Investment Plan 
Service transformation – reviewing service delivery to ensure
we are meeting service user needs in a sustainable way:
• Sport and Leisure
• Libraries, Learning Centres & Heritage
• Music Instruction
Public and staff consultation and engagement via surveys and workshops
National Strategies (future direction of travel)
Corporate Plan
Local Outcome Improvement Plan (LOIP)
Communities and Place – supporting our communities to
build capacity and influence decision-making that impacts on
them and their local area.
Local Outcome Improvement Plan (LOIP)
Corporate Plan
Moray Partnership CLD Plan 
Working in partnership to achieve positive outcomes – with
specific focus on poverty, inequality and communities.
Systems Based Approach to Physical Activity in Moray
Local Outcome Improvement Plan (LOIP) 
8. Strategic
Outcome
or Priority
Action  Planned Outcome Outcome
measures
Completion
target
Lead Priority
Rating
(1 high 3 low
and 4 for
ongoing, 5
for on hold)
(L) Empowering
& connecting
communities.
(CP) Building
1. Take a partnership
approach to locality
planning in priority
areas of Moray to enable
people to influence
More of the activities,
services and plans are
influenced by the
communities they serve 
Improvements in
specific location
measures in
locality plans 
1. March
2026 
Communities
Service
Manager 1
Page 341

Page 342

APPENDIX 2
EDUCATION RESOURCES AND COMMUNITIES SERVICE PLAN 
Thriving,
Resilient,
Empowered
Communities
services and develop
community action 
1.1 Locality Planning process
supported in New Elgin
and Buckie through work
of community led action
groups developing and
delivering projects.
1.2 Further development of
community engagement
with the public on the
future of council services.
1.3 Support the engagement
and consultation work on
service specifics as they
emerge (e.g. Libraries and
Leisure) (BV1.2)
1.4 Work with community
planning partners to
develop shared
engagement (BV1.2)
1.5 Explore with partners
establishing community
survey/panel (BV1.2)
1.6 Development of new
digital engagement
platform for all corporate
community engagement 
More communities and
individuals are more
involved in local decision
making and in helping to
plan and deliver of local
services 
Consideration
being given to
case study-based
reporting to
evidence delivery
for locality plans 
PIs
• ERC003
Number of
new
Community
action plans
in place
• ERC004
Number of
Support
Agreements
linked to
community
assets.
• ERC036 % of
Support
Agreements
meeting at
least one
objective.
• ERC008 %
increase in
number of
local
residents
engaged in 
1.1 31 March
2026 
1.2 31 March
2026 
1.3 30 June
2026 
1.4 30 June
2026 
1.5 30 June
2026 
1.6 June 2025
Page 342

Page 343

APPENDIX 2
EDUCATION RESOURCES AND COMMUNITIES SERVICE PLAN 
locality
planning
process (NE &
Buckie)
• ERC001 % of
local people
who agree
with the
statement ‘I
can influence
decisions
affecting my
local area’. 
(L) Empowering
& connecting
communities.
(CP) Building
Thriving,
Resilient,
Empowered
Communities
2. Tackle the affordability
and standard of our
learning estate to
ensure sustainability
while meeting climate
requirements. 
2.1 (Design & Construction)
Elgin High School
Extension Build
2.2 (Design and
Construction) Future
Forres Academy
operational
2.3 (Design and
Construction) Future
Buckie HS operational
Moray has high
performing schools that
are fit for the future and
financially and
environmentally
sustainable 
PIs
• EdS100 % of
schools that
are rated B or
better for
condition.
• EdS1001 % of
schools that
are rated B or
better for
suitability.
• ERC010 %
Spare
building
capacity.
• % of schools
with
approved
2. 30
December
2030 
2.1 31 March
2027 
2.2 28 Feb
2029 
2.3 Dec 2030 
Learning
Estate
Programme
Manager
1
Page 343

Page 344

APPENDIX 2
EDUCATION RESOURCES AND COMMUNITIES SERVICE PLAN 
2.4 (Engagement and
Consultation) ASG Level
Options Development
(long term investment
strategy)
2.5 (Strategic Planning)
Learning Estate Review
Report
2.6 (Engagement and
Consultation) Effective
stakeholder engagement
on Learning Estate
sustainability options
2.7 (Estate Rationalisation)
Future of Crossroads PS
agreed by Q1 2025 
2.8 (Design and
Construction) Options
developed to manage for
Elgin South and North
primary school capacity
requirements
2.9 (Design & Construction)
Schools BB upgrade
programme delivering
minimum 3 B
condition/suitability
school upgrades per year 
asset
management
plans.
• % ASG
options
reviews
completed. 
2.4 30 May
2025 
2.5 30 Nov
2026 
2.6 31 Mar
2026 
2.7 30 June
2026 
2.8 31 March
2027 
2.9 Annual 
Page 344

Page 345

APPENDIX 2
EDUCATION RESOURCES AND COMMUNITIES SERVICE PLAN 
5. Service
Level
Outcomes
or Priorities
Action Planned Outcome Outcome Measures Completion
Target
Lead Priority
rating
Youth Work  3. YW deliver targeted
work in each secondary
supporting
employability skills and
a positive transition
from secondary school
into college, work or
training for identified
young people. 
3.1 Youth Work staff deliver
targeted sessions in
partnership with school
to address health and
wellbeing issues and/or
Employability activities
in S3.
3.2 Outreach youth workers
are employed in Buckie,
Forres, Keith and Elgin to
pilot work in school and
in the community with
young people who are
not fully engaged in
learning. 
Working together to
make the biggest
difference to the
outcomes for people in
Moray. 
Young people are more
ready to enter
employment, training or
college. 
Young people
participate in informal
learning programmes
they have co-designed
and as a result have
increased attendance
at school.
PIs
• ERC023 Increase the
% of youth
engagement and
participation.
• ERC023a Number of
young people engaged
in Youth Work
activities.
3. 31 March
2026 
Communities
Service
Manager
2
Page 345

Page 346

APPENDIX 2
EDUCATION RESOURCES AND COMMUNITIES SERVICE PLAN 
Transforming
Services
4 Transform our Sport &
Leisure, Libraries,
Learning Centres &
Heritage and Music
Instruction &
Performance service
provision to ensure a
sustainable council for
the future. 
4.1 Sport & Leisure –Change
Management Plan of
staff completed.
4.2 Music – Operating model
created that remains
within funding envelope. 
Community
opportunities identified
and developed.
4.3 Implement any budget
saving decisions
connected to the Sport &
Culture Service. 
4.4 Libraries – New operating
model developed in
conjunction with staff
and users and Change
Management Plans
completed for all staff
4.5 Sport & Leisure –
determine and
implement future service
Create a sustainable
future for our services
by: 
• Engaging new users
to access our
service to be active
and ensure
prevention/early
intervention
improves their long-
term health and
wellbeing
prospects. 
• Engaging new users
to access digital
and physical
resources and
support to improve
their lifelong
learning
experiences. 
• Creative arts
participation and
pathways are
further developed
enhancing lifelong
learning
experiences. 
PIs
• CLS01 Cost per
attendance of sport
facilities.
• CLS02 Cost per library
visit.
• CLS05a % of adults
satisfied with libraries.
• CLS05d % of adults
satisfied with leisure
facilities.
• EdS511.10 Number of
new learners at Moray
libraries learning
centres.
• ERC018 % increase of
income raised by
leisure services.
• ERC018a Income
from admissions to
leisure services.
• SCC2 Number of
attendances per
1,000 population for
MC indoor sports and
leisure services
(Cumulative)
• ERC052 Number of
new learners
accessing
Instrumental Music
Instruction
4. 31 March
2028 
4.1 31 March
2026 
4.2 30 June
2025 
4.3 31 Dec
2025 
4.4 31 Mar
2026 
4.5 31 Mar
2028
Sport &
Culture
Services
Manager
1
Page 346

Page 347

APPENDIX 2
EDUCATION RESOURCES AND COMMUNITIES SERVICE PLAN 
direction (inc assets and
governance).  Change
Management Plans
completed for all staff
4.6  Music – Review and
update operating models
of programmes to ensure
positive impact and
efficiency whilst
remaining within funding
envelope.
• Engaging with the
community in
regard to the co-
design and delivery
to meet local need
within available
budget 
• ERC024 Number of
musical performance
opportunities
delivered
(Cumulative)
• ERC053 % of budget
saving decisions
successfully achieved 
4.5 Milestones (Year 1) 
Future direction
approved at
Committee 
New staffing structure
in place 
Increased income
generation 
Milestones (Year 2)
Staff and user group 
meetings established
and working
effectively Changes to
governance
implemented 
4.6 30 June
2026
Sustaining
Assets
5. Implement changes to
the Sport & Culture
Asset Estate to ensure
future sustainability 
Create a sustainable
future for our services 
Investment in the area
benefits communities
PIs
• ERC028 % of Sport &
Culture facilities that
5 31 March
2028 
Sport &
Culture
Services
Manager
2
Page 347

Page 348

APPENDIX 2
EDUCATION RESOURCES AND COMMUNITIES SERVICE PLAN 
5.1 Leisure & Libraries –
prioritise capital plan
funding to sustain
operation of assets
5.2 Leisure & Libraries – work
with communities to
engage in developing a
sustainable service
5.3 Libraries – investigate
and progress co-location
opportunities
5.4 Leisure – progress
refurbishment and
upgrade of leisure
facilities as determined
as part of leisure review
ensuring consideration
of climate change and
biodiversity
are rated B or better
for condition.
• % of Sport & Culture
Capital Plan funding
utilised
• No. of user groups set
up for leisure and
libraries community
engagement 
• Number of co-
location opportunities
developing/completed 
5.2 Milestones (Year 1)
User groups for all
leisure and library
facilities established 
Online engagement
methods set up and in
operation connected
to management
systems 
Milestones (Year 2)
Leisure app set up
and operating with Fit
Life members 
5.3 Milestones (Year 1)
Business Cases
completed 
5.1 Annually
by start
of April 
5.2 31 Mar
2028 
5.3 31 Mar
2028 
5.4 31 Mar
2028
Page 348

Page 349

APPENDIX 2
EDUCATION RESOURCES AND COMMUNITIES SERVICE PLAN 
Milestones (Year 2) 
Co-location project/s
completed 
5.4 Milestones (Year 1)
RIBA Stages 0-3
completed 
Milestones (Year 2)
RIBA Stage 4
completed
Health &
Wellbeing
(General
Population)
6 Continued
development and
implementation of the
Systems Based
Approach (SBA) to
Physical Activity in
Moray. 
6.1 Work with relevant
Officers, organisations
and individuals to
develop this partnership
approach and report to
Community Planning
Partnership every 6
months.
6.2 Active Schools &
Community Sport and
Sport & Leisure -
Implement relevant
areas of responsibility
connected to the
Improved health,
wellbeing and
resilience in our
communities. 
Working together to
make the biggest
difference to the
outcomes for people in
Moray
PIs
• ERC054 No of actions
implemented in
systems-based
approach
strategy/plan 
6.1 Milestones (Year 1)
Relevant strategies
reference SBA across
CPP 
Milestones (Year 2)
Minimum of 5 projects
delivered that have
derived from SBA 
6.2 Milestones (Year 1)
Minimum of 2 projects
delivered that have
derived from SBA 
6. 31 March
2028 
6.1 31 Mar
2028 
6.2 31 Mar
2028 
Sport &
Culture
Services
Manager
4
Page 349

Page 350

APPENDIX 2
EDUCATION RESOURCES AND COMMUNITIES SERVICE PLAN 
Systems Based
Approach to Physical
Activity in Moray
6.3 Develop opportunities in
regards to health and
wellbeing
provision/prevention
agenda through sport &
culture service facilities
and programmes 
Milestones (Year 2)
Minimum of 5 projects
delivered that have
derived from SBA 
6.3 Milestones (Year 1)
Exercise referral
provision delivered
across all leisure
facilities 
Milestones (Year 2)
DHI app implemented
within service 
6.3 31 Mar
2028
Economic
Development
Support
7 Sport & Culture Service
support relevant
projects connected to
the Moray Growth Deal,
Long Term Town Plan
and any other relevant
major funding streams 
7.1 Work with relevant
Officers and
organisations to develop
and implement projects
connected to Sport &
Culture Services. 
Working together to
make the biggest
difference to the
outcomes for people in
Moray 
Investment in the area
benefits local
communities and
based on demand/need
PIs
• No. Growth Deal and
LTTP (externally
funded) projects
connected to sport &
culture services
• % Growth Deal and
LTTP (externally
funded) projects
implemented
31 March
2028
Sport &
Culture
Services
Manager
3
Page 350

Page 351

APPENDIX 2
EDUCATION RESOURCES AND COMMUNITIES SERVICE PLAN 
Addressing
Inequalities
8. Sport  and Culture
services continue to
develop and support
initiatives to reduce
inequalities (particular
focus for Active
Schools and
Community Sport
(AS&CS)) 
8.1 Continue development
of targeted approaches
focussed on poverty,
mental health and
disability/ASN
8.2 Work with relevant and
organisations to develop
and implement
projects/initiatives that
contribute to addressing
inequalities 
Improved health and
wellbeing in our young
people 
Young people have
access to high quality
services that support
their learning, wellbeing
and independence. 
Local residents can
participate in sport and
culture opportunities to
develop their skills and
confidence 
PI’s 
• No. of targeted
programmes delivered
• No of collaborative
projects/initiatives
addressing inequalities
implemented 
8.2 Milestones (Year 1)
Creation and
implementation of
Moray Disability
Sports Hub 
Completion of cohort
2 of Mental Health
Accreditation for
Sports Clubs 
Minimum of 5 poverty
projects delivered by
AS&CS 
Milestones (Year 2)
Completion of
Equality, Diversity &
Inclusion Map for the
Sport & Culture
Service 
8. 31 March
2028 
8.1 31 Mar
2026 
8.2 31 Mar
2028
Sport &
Culture
Services
Manager
2
Page 351

Page 352

APPENDIX 2
EDUCATION RESOURCES AND COMMUNITIES SERVICE PLAN 
Minimum of 5 poverty
projects delivered by
AS&CS 
Business
Admin
Review
9 Development and
Implementation of
School Business Admin
Review 
9.1 Change Management
Plan developed (Phase 2
– secondary schools)
and consultation
completed. 
The benefits of digital
administration
approaches in schools
are fully realised. 
Increased consistency
in administrative
processes across ELC
and school settings. 
PIs
• ERC016 Business
Admin review –
Reduction in costs.
• ERC017 % uptake of
digital solutions to
support efficiency.
31 October
2025
Business
Support
Team
Manager
1
Health &
Wellbeing
(Staff)
10 Ensure revised
operational
implementation of
absence management
procedures are applied
by managers
Absence is managed
effectively and levels of
absence are reduced
efficiently and
timeously.
PIs
• ERC057 Sickness
absence days lost
(Service) (Non-
Teacher) ERC
• ERC057a % of
Sickness (Service)
(Non-Teacher) ERC
31 March
2026
(Ongoing
Annually)
Head of
Service
2
Workforce
Culture for
Change
11 Develop workforce
culture to support and
enable change 
Employees are involved
in change with
opportunities to
support the design,
delivery and
implementation of
service related changes
and transformation
• feedback from teams
will be sued to assess
the effectiveness of
change management
through and the
successful
implementation of
31 March
2026
(Ongoing)
Service
managers
4
Page 352

Page 353

APPENDIX 2
EDUCATION RESOURCES AND COMMUNITIES SERVICE PLAN 
service-related
changes 
Page 353

Page 354

Page 354

Page 355

Report to: Education, Children’s and
Leisure Services
Committee 
Meeting Date: 13 May 2025  
Report by: Interim Chief Social Work
Officer/Head of Service 
Report No: MIJB001/25/JL/HL  
Author: Jim Lyon Contact Email: jim.lyon@moray.gov.uk 
Subject: Quarter 3 (October to December 2024) Performance Report for Children
and Families and Justice Social Work 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to inform Committee on Children, Families and Justice Social
Work performance during Quarter 3.  
1.2  This report is submitted to Committee in terms of Section III (A) (4) of the Council's
Scheme of Administration to monitor performance in accordance with the Council’s
Performance Management Framework. 
2.  SUMMARY  
2.1  This report provides Committee with an update on the performance of local indicators for
Quarter 3 as presented in the Performance Report and the analysis of the local indicators
as detailed in Appendix 1. 
3.  RECOMMENDATIONS  
3.1  It is recommended that Committee:   
i)  Scrutinise and note the performance of local indicators for Quarter 3 as
presented in the Performance Report at Appendix 1; and 
ii)  note the analysis of the local indicators as detailed in Appendix 1   
Jim Lyon
Interim Chief Social Work Officer / Head of Service 
Item 26.*
Page 355

Page 356

4.  BACKGROUND AND CONTEXT  
4.1  The purpose of this report is to inform the Committee of the quarterly performance data
which provides the analysis of the delivery of Children and Families and Justice Social
Work services.  
4.2  Appendix 1 identifies local indicators for the Council and the functions delegated by NHS
Grampian and Moray Council of Children and Families and Justice Social Work services to
allow wider scrutiny by the Committee. 
5.  PROPOSALS  
5.1  Work is underway to develop and agree the refresh of Moray’s key performance indicators
to enable recording of local data set against the national performance indicators. 
5.2  Appendix 1 provides a summary and the historical trends in terms of: 
• Child Protection activity
• Looked after Children 
• Justice and Youth Justice 
5.3  Statistics for Child Protection activity are provided against the academic calendar which
runs from August to July annually.  This is because this data is gathered and analysed by
the Children Services Partnership and reported to the Child Protection Committee (CPC)
through the Child Protection Minimum Data Set.  Appendix 1 begins with Child Protection
Q1 (August-September) from page 1 to 11, Financial Q3 (October to December) data is
from page 12 to 30.  Any trends of anomalies in this data are considered through the CPC
Data Sub-group and reported accordingly. 
5.4  Statistics for Looked After Children, Justice and Youth Justice are reflected across the
financial calendar running from April to March.  A summary of performance for each of the
reporting categories is provided below. 
Child Protection Activity
5.5  At the end of this Child Protection (CP) Quarter 1, 69 children were registered on the North
East Child Protection Register (NECPR) at a rate of 3.9 per 1,000 of 0–17-year-olds within
the population.  The national and comparator data will be available at the end of the CP
year (after August 2025) which will enable the data to be benchmarked at that point. 
Unfortunately, there is no reliable way comparisons can be tested before this information
is officially published.   
Looked After Children
5.6  At the end of Financial (Fin) Quarter 3, the number of looked after children (175) was 9.9
per 1,000 of 0–17-year-olds within the population (total: 17,668).  This is lower than the
national average which is 12.1 based on the most recent comparator statistics from 2022-
23.  This figure includes 9 New Scots (formally called Unaccompanied Asylum-Seeking
Children (UASC)) and 6 children who are cared for on a part-time basis (Short Breaks). 
5.7  90.4% (47/52) of children in foster care are cared for by Moray Council foster carers. The
Carer Recruitment Campaign continues to focus on the recruitment of foster carers and
supported lodgings carers.  Resultantly, there has been an improved ability to have
Page 356

Page 357

children and young people cared for by Moray Council foster carers.  Thus, reducing the
need to purchase external agency care.  The Carer Recruitment Campaign is continuing
where it is anticipated that the use of in-house carers will increase. 
5.8  Currently, 25% of looked after children in Moray are in approved Kinship care with family
members. The average of children living with kinship carers is 28% in comparator local
authorities (this is a ‘more than’ target based on the assumption Kinship care is preferable,
where it is safe and appropriate, to non-family care). Moray is currently 3% below this
average.  Resultantly, work is being undertaken to strengthen practice, ensuring children,
at the point of allocation, have a holistic extended family map produced, regularly
updated, providing clear information on Kinship care options in the event short breaks or
alternative care may be considered in the future. 
5.9  17.1% (30/175) of looked after children are cared for in residential care.  The target for this
indicator is less than 15%, which was the average across comparator local authorities for
2022/23 (this is a ‘less than’ target based on the assumption foster care and kinship care
will be the preferred option when it is safe and appropriate). This figure includes six young
people who are cared for on a part-time (short breaks) basis. For illustrative purposes,
excluding those who have short breaks (children and young people who are in the care of
their families) the figure is 13.7% (24/175) which is 1.3% lower than the average of
comparator authorities.  However, in common with most of the comparator local
authorities, Moray is higher than the Scotland national percentage of 10%. 
5.10  While nationally significant, the numbers of looked after children are comparatively small.
This means that including short-breaks and New Scots in the Looked after Child dataset
may cause significant variance in percentages.  It is difficult to ascertain how other
authorities record their statistics as the level of detail is not readily available. An exercise
is being undertaken to consider what is being recorded by them. 
5.11  89% of brothers and sisters continue to live together when they come into foster care.  Due
to resource limitations, this is much more difficult to achieve when there is need to
accommodate large family groups. The Maintaining Relationships Project is developing an
approach and policy to ensure brothers and sisters can remain together as far as possible
and where this is their assessed needs.   
5.12  For New Scots, Moray has not adopted the residential homes model used by other local
authorities.  Moray’s model comprises of a combination of local authority housing and
supported lodgings care and support.  As such, the uncertainty regarding the future
numbers of New Scots should not have an impact on residential care capacity for Moray. 
Justice and Youth Justice
5.13  At the end of Financial (Fin) Quarter 3, there were 532 people supported by Justice and
Youth Justice Services of whom 44 are care experienced young people (CEYP) including 13
in Youth Justice and 31 in Justice. 
5.14  Overall, the number of CEYP in both Justice Social Work and Youth Justice has been on a
reducing trend from 13% at the end of March 2021 to 8.3% at the end of Fin Quarter 3. 
There has been a slight increase of 1.1% from Fin Quarter 2 and work continues to identify
and support care experienced young people within these services, to offer early support
where possible and reduce the risk of re-offending.
Page 357

Page 358

5.15  Most individuals supported by Youth Justice and Justice Social Work are male (86.4%
Justice Social Work, 87.5% Youth Justice).  Gender responsive support is offered to
females taking account of research and data indicating women in the justice system are
more likely to have experienced trauma and more likely to be a sole carer for a child or
family member. 
5.16  The Justice Social Work Service submitted 100% of reports to Court by their due date.  This
includes requests from all Courts. 
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  X
Policy and Legal  X
Financial  X
Risk  X
Staffing  X
Best Value and Transformation  X
Property  X
Information Communications Technology/Digital        X
Equalities. Social Inclusion and Economic Impact   X
Climate Change and Biodiversity Impact  X 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒Tackle Poverty and Inequality.
☐Build Stronger Greener Vibrant Economy.
☒Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
local Outcomes Improvement Plan priorities:
☐Developing a diverse, inclusive, and sustainable economy.
☒Building a better future for our children and young people in Moray.
☒Empowering and connecting communities.
☒Improving wellbeing of our population.   
6.3  Policy and Legal 
None arising as a direct result of this report.  
Page 358

Page 359

6.4  Financial 
None arising as a direct result of this report. 
6.5  Risk 
None arising as a direct result of this report.  
6.6  Staffing 
None arising as a direct result of this report.  
6.7  Best Value and Transformation 
None arising as a direct result of this report.  
6.8  Property 
None arising as a direct result of this report.  
6.9  Information Communications/Technology/Digital 
None arising as a direct result of this report.  
6.10  Equalities, Social Inclusion and Economic Impact 
None arising as a direct result of this report.  
6.11  Climate Change and Biodiversity Impacts 
None arising as a direct result of this report. 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with Children and Families and Justice
Social Work Senior Management Team and Caroline O’Connor, Committee Services
Officer and any comments made have been incorporated into the report 
8.  BACKGROUND PAPERS  
8.1  There are no background papers for this report.   
Page 359

Page 360

APPENDIX 1
1 | P a g e
CHILDREN & FAMILIES AND JUSTICE SOCIAL WORK - QUARTER 3 (OCT-DEC 2024)
PERFORMANCE REPORT  
PLEASE NOTE THIS REPORT IS SPLIT INTO TWO SECTIONS. THE FOLLOWING SECTION USES
THE ACADEMIC CALENDAR (1 AUG – 31 JULY).  THE INFORMATION PRESENTED REPRESENTS
CHILD PROTECTION (CP) QUARTER 1 WHICH IS LATEST AVAILABLE DATA (AUG TO OCT 2024).
At the end of the CP Quarter 1, 687 referrals were made to the Access Team for 534 children
(as per graph 1).  
Graph 1: CP Quarter 1 - Referrals received by Access Team 
The potential referral
routes are Social Work,
SCRA, Police, Courts,
Education, Health, 3rd
Sector, community,
family and young person. 
When a referral has been
received it can be
categorised as:
IRD – immediate child
protection concerns.
Enquiry – information
gathering to determine
next steps (if any).
Assessment – team will
conduct an initial
assessment of needs.
Number of referrals can be more than the number of children, as we can receive referrals
from a range of sources about the same child.
Pie chart 1: Sources of referral 
233
267
187177 193
164
0
50
100
150
200
250
300
Aug-24 Sep-24 Oct-24
Referrals
Referrals: No. in last month Referrals: No of children
286
112
115
89
85
Sources of Referral
Police
Education
Health and Social Work
Family & Community
Other Agency
Page 360

Page 361

APPENDIX 1
2 | P a g e
In CP Quarter 1, 41.6% of referrals were from the Police (286), followed by Health and Social
Work 16.7% (115), Education 16.3% (112), Family and or Anonymous 12.9% (89), and 12.4%
coming from other professionals (85) (as per pie chart 1).  Where the number of referrals is
higher than the number of children, this can be attributed to the fact there can be multiple
sources of referrals about a child (e.g. Health, Education and Police).  This potentially reflects
consistent thresholds across the partnership.
Graph 2: IRDs and number of children subject to an IRD
Graph 2 shows the quarterly trend in IRDs (between 1 Aug 2023 and 31 July 2024). In CP
Quarter 1, 64 children were involved in 47 IRDs. Of the 64 children, 23 had been subject to
two or more IRDs in the past (36%). For each quarter, the number of children is greater than
the number of IRDs as each IRD can consider multiple children within a family.
Most referrals for IRDs in CP Quarter 1 came from Social Work (44% [28]), followed by Police
(19% [12]) and Education (19% [12]).
The IRD process determines the most suitable pathway for the child to ensure their safety
and any support required. An IRD can consider initiating a Child Protection Planning
Meeting, which deliberates the child’s name being placed on the Northeast Child Protection
Register (NECPR/CPR/Register).
Pie chart 2: Main reasons for IRD 
24
87
31
2
9
3 7
Reasons for IRD Physical Assault
Sexual Assault
Domestic Abuse
Other reason
Child Criminal Expl
Child Sexual Expl
Drugs
Mental Health
Neglect
66 65 63
47 47
125
105
89 84
64
0
20
40
60
80
100
120
140
Q1 Q2 Q3 Q4 Q1
No. of IRDs and Children involved
No. of  IRDs held No. of Children involved
Page 361

Page 362

APPENDIX 1
3 | P a g e
As per chart above, throughout CP Quarter 1, physical assault remains a consistent reason
for an IRD being held (24, 37.5%), followed by drugs (9, 14%), sexual assault (8, 12.5%),
neglect (7, 11%) and domestic abuse (7, 11%).                       
Pie chart 3: Child protection concerns 
During CP Quarter 1, Neglect, Domestic Abuse, Parental Drug Use and Child affected by
parent/carer mental ill health are the main child protection concerns. *Note there may be
more than one concern documented for each child.
Following the IRDs, 17 Child Protection Investigations were carried out, 12 Initial Child
Protection Planning Meetings were convened, and 21 Joint Investigative Interviews were
requested.
Graph 3: Joint Investigative Interviewing 
Graph 3 shows the trend across the year 2023/24 for joint investigative interviews and
Scottish Child Investigative Interviews. 
18 2
22
12
24
8
12
22
3
6
CP Concerns as at 31 Oct 24
Child Affected by Parent/Carer
Mental Ill-Health
Child Criminal Exploitation
Domestic Abuse
Emotional Abuse
Neglect
Other Concern(s)
Parental Alcohol Misuse
Parental Drug Misuse
Physical Abuse
Services Finding It Hard to Engage
16
26
9 12 12 9 7 7
13 10
4 7 8 713 22 8 11 9 6 7 7 13 9 4 7 8 7
3 4
1 1 3
0 0 0 0 1 0 0 0 0
0
5
10
15
20
0
10
20
30
Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 Jan-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24
JIIs using Scottish Child Interview Model
JII: No. of children subject to a JII as decision of IRD
JII: No. of JII by SCIM as decision of IRD
JII: No. of JII by 5 day process as decision of IRD
JII: No. of children who declined/or did not complete JII
Page 362

Page 363

APPENDIX 1
4 | P a g e
Graph 4 – JII & SCIM 
Graph 4 shows the activity of Joint Investigative Interviewing across CP Quarter 1, during
which 23 children were recommended for Joint Investigative Interview (JII); 17 interviews
were completed and six children either declined or a different form of interview was carried
out.
Graph 5: Initial Child Protection Planning Meetings 
Graph 5 shows the trend across the last three reporting years (2021-2024) for the number of
Initial and Pre-birth Child Protection Planning Meetings, and the number of children. The
number of children subject to CPPMs is higher than the number of meetings held, due to
some meetings considering sibling groups.
At the end of CP Quarter 1, 12 Initial and Pre-birth Child Protection Planning Meetings were
held for 22 children of these, 22 children’s names were place on the register. 
8
13 16
23
8 11
22
17
32
41
17
12
22
5 5
9
13
7 6
10 9
16
22
10 7
12
0
5
10
15
20
25
30
35
40
45
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1
Aug-Oct Nov-Jan Feb-Apr May-Jul Aug-Oct Nov-Jan Feb-Apr May-Jul Aug-Oct Nov-Jan Feb-Apr May-Jul Aug-Oct
No. of Children and ICPPMs and Pre-Birth CPPMs
Number of children subject to Initial and Pre-Birth CPPMs Number of Initial and Pre-Birth CPPMs
Page 363

Page 364

APPENDIX 1
5 | P a g e
Graph 6: Conversions from IRD to ICCPM 
Graph 6 above shows the trend from 2020 through to 2024 and specifically CP Quarter 1,
where the conversion rate from ICPPM to Child Protection Registration was 100%.
During CP Quarter 1, there were 18 Review Child Protection Planning Meetings (RCPPM)
held for 37 children, where their circumstances were reviewed with their families, lead
professionals and independent advocates, to assess if the identified risks had been
sufficiently reduced to consider removing the child’s name from the register. 
13
20
28 30
8
18 16
25
8 10
22 18
25
39
19 14
34
75 78
100
76
100
77
94 91
75 73
45
78 78 83
94
75
100
0
10
20
30
40
50
60
70
80
90
100
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1
Aug-
Oct
Nov-
Jan
Feb-
Apr
May-
Jul
Aug-
Oct
Nov-
Jan
Feb-
Apr
May-
Jul
Aug-
Oct
Nov-
Jan
Feb-
Apr
May-
Jul
Aug-
Oct
Nov-
Jan
Feb-
Apr
May-
Jul
Aug-
Oct
2020/21 2021/22 2022/23 2023/24 2024/25
Conversion Rates
% IRD to Initial and Pre-Birth CPPMs % Initial and Pre-Birth CPPMs to Registration
687
referrals
47 IRDs
17 CPIs
12 ICPPMs
The
conversion
rate from
referral to IRD
is 6.8%
The
conversion
rate from IRD
to CPI is 37%
Conversion
rate from
CPI to ICPPM
is 70.6%
Page 364

Page 365

APPENDIX 1
6 | P a g e
Graph 7: Child Protection Registration Trends 
The trend is depicted across Graph 7 from 2021-2024 and shows in CP Quarter 1, that 19
children were de-registered and 22 new children were registered. This meant at the end of
CP Quarter 1, the number of children who were on the Child Protection Register (CPR) had
increased by 3 (from 66 to 69).
Graph 8: Child Protection Registration Comparator Authority Trends (up to 31 July 2023) 
5 10 15
21
6 8 9 14
25
34
16
9
2231 35
44
50
42 37
27 32
50
79
70 66 69
9 6 6
15 14 13
20
9 9 5
25
13
19
0
10
20
30
40
50
60
70
80
90
100
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1
Aug-Oct Nov-Jan Feb-Apr May-Jul Aug-Oct Nov-Jan Feb-Apr May-Jul Aug-Oct Nov-Jan Feb-Apr May-Jul Aug-Oct
2021/22 2022/23 2023/24 2024/25
Child Protection Register
Number of Registrations Number on Register Number of De-registrations
Page 365

Page 366

APPENDIX 1
7 | P a g e
Graph 9: Number of Child Protection Registrations Comparator Authority Trends (1 August
2022 to 31 July 2023) 
Chart 10: Number of Child Protection Deregistration Comparator Authority Trends (1
August 2022 to 31 July 2023)
Pie chart 4: CP Quarter 4 registration reasons 
Page 366

Page 367

APPENDIX 1
8 | P a g e
Graph 11: Registration Categories 
Graph 11 above shows the trend in registration categories across the reporting period (from
August 2023 to October 2024). There has been a rise in new registrations for the category
Child affected by parental mental ill-health, with figures showing an increase from no new
registrations in CP Quarter 4 (May-July 2024) to 5 in CP Quarter 1 (Aug-Oct 2024).
12.5% of IRDs were for the category sexual abuse which does not follow through to
registration reasons because the majority were not familial and were more due to
experiences of sexual abuse from a peer, where the family are supportive and assessed as
able to protect the young people.
3
1
6
8
6
8
5
1
7
11
4
4
2
3
5
3
3
3
3
16
1
2
8
3
1
5
5
4
1
1
2
8
9
13
2
4
2
3
4
0 2 4 6 8 10 12 14 16 18
Q1
Q2
Q3
Q4
Q1
Registratration Categories
Other Concern
Neglect
Criminal Exploitation
Emotional Abuse
Physical Abuse
Parental Drug Use
Parental Alcohol Use
Domestic Abuse
Child experiencing mental health problems
Child Affected by Parent/Carer Mental Ill-Health
Services find it hard to engage
Page 367

Page 368

APPENDIX 1
9 | P a g e
37.5% of IRDs was for physical abuse which does not follow through to registration reasons
as most physical assaults were from parents struggling with their parenting role, and with
appropriate support to families, child protection plans were not necessary.
Graph 12: Family Groups 
As shown in Graph 12, at the end of CP Quarter 1, there were 15 family groups consisting of
one child, five family groups with two children and 10 family groups of three or more
children on the register.
Graph 13: Previous Registrations 
At the end of the CP Quarter 1, there were 27 children on the register who had one previous
registration and 14 with two or more previous registrations. Two children’s names were
placed back on the register within 24 months of de-registration (as indicated in Graph 13). 
12
5
15
9
8
14
10
7
12
0 2 4 6 8 10 12 14 16
CPR Family Group: 3 or more
CPR Family Group: 2
CPR Family Group: Single child
Family Groups on Moray CPR
Aug-24 Sep-24 Oct-24
15
24 22
25 27
8 10
7 8
14
0
5
10
15
20
25
30
Q1 Q2 Q3 Q4 Q1
Previous Registrations on Moray CPR
No. of children with 1 previous registration No. of children with more than 2 previous registration
Page 368

Page 369

APPENDIX 1
10 | P a g e
Graph 14: Time on Moray CPR 
Graph 15: Age of children on the register
1
5
9
26
31
1
5
14
21
24
1
5
9
23
24
0 5 10 15 20 25 30 35
> 2 years
18 mths < 2
years
1 year < 18 mths
6 mths < 1 year
<6 months
Time on Moray CPR
Aug-24 Sep-24 Oct-24
1 1 1 1 1 1 1
4
12
15
18
25
29
37 36
26
22 22 21 22
20 21
1716
20 20
22
25 26
24
26 26 26
24 24 25 25 25
9 10 11
13
15 15 15
18 18 18 19 19 19
16
20
1 1 1 1 1 1 1 1 1 2
3
0
5
10
15
20
25
30
35
40
Age Bands on Moray CPR
Unborn 0-4 5 - 10 11 - 15 16+
Page 369

Page 370

APPENDIX 1
11 | P a g e
Graph 15 shows the trend for 2023/24 against CP Quarter 1 data where all age categories
have remained consistent with only a slight fluctuation throughout the Quarter.  The
number of young people aged 16 years old has fluctuated since the end of the previous
quarter (July 2024). 
Page 370

Page 371

APPENDIX 1
12 | P a g e
THE FOLLOWING SECTIONS REPORT AGAINST THE FINANCIAL QUARTER (OCT-DEC 2024)
Graph 16: Number of children looked after away from home and at home 
Graph 16 identifies that at the end of Financial (Fin) Quarter 3, there were 175 children who
were looked after by Moray. This figure has remained relatively stable throughout the
reporting period. 
Over the previous quarter there has been a steady decline in the numbers of Looked After
Children.  This reflects the wider approach of supporting children and their families without
the need for them being Looked After either at home or in other care settings.
Pie chart 5: Care setting categories 
At the end of Fin Quarter 3, 47% of children were in family settings at home or in kinship
care with 53% in other settings such as foster care or residential homes. This is a positive
indication that many looked after children can remain within their network of family and
friends. Alongside this, 89% of brothers and sisters remain together in a care setting. 
Brothers and sisters who are not together are because of family circumstances or assessed
needs.  There is planned work via the Maintaining Relationships Project to sustain and
increase the percentage of siblings remaining together in care settings in line with the
Children’s Service Plan.
176
178
185
187
183
180
182
172 172
177
179
175
173
175
177 176 175
160
165
170
175
180
185
190
No. of Looked After Children
52
11
6
1246
37
1
9
1
Children in Care Settings
Foster Care
Residential in Moray
Short Breaks /Shared Community Care
Out of Area
Kinship
At Home
Pros Adopters
New Scots
Secure
Page 371

Page 372

APPENDIX 1
13 | P a g e
Foster care (52) and kinship care (46) are the highest categories followed by children looked
after at home (37).  Our residential houses (11) remain at approximately the same level as
the Out of Area residential category including Secure Care (13).  The carer recruitment
campaign has seen new foster carers approved to support young people remaining in Moray
in family care settings.  A significant majority of young people are in family-based care (145,
82.9%) rather than residential care (30, 17.1%).
There remains the commitment to support young people in family-based care settings.  This
includes supporting families to identify and promote kinship care options via Family Group
Decision Making processes.  
At the end of Fin Quarter 3, 13.7%, 24 of our looked after children were cared for on a full-
time basis in residential care.  If short breaks are included the figure increases to 17.1%.  The
indicator (to be kept within or lower) is adjusted annually to the average of comparator
authorities (17.5% 2022/23).  As such, Moray is below the average indicator when
considering full-time care on its own and including short breaks, highlighting our priority to
support young people in family-based care, where possible, to provide a positive model of
family life.
One young person was remanded in secure care from November 2023 at the direction of the
Court.  This aligns with the recent changes in Justice legislation for children under 18 where
they are remanded into the care of local authorities rather than Young Offenders
Institutions.
Moray hosts a group of nine young people who are New Scots (formerly Unaccompanied
Asylum Seeking Children) via the National Transfer Scheme.  These children and young
people are allocated to the Throughcare and Aftercare Team by the Home Office and are
counted as looked after children to ensure they receive full support.  Initially, these young
people are in Supported Lodgings or Supported Accommodation care settings.  The team
continues to successfully support them to move into their own independent housing once
they have been granted asylum.  The approach adopted by Moray is seen by COSLA as a
model of good practice as it offers flexibility and has an ability to respond to the differing
needs of young people.
Graph 17: Moray foster care households 
35 36 37 37 36 35 36
27 27 25 25 28 31 31
0.00%
20.00%
40.00%
60.00%
80.00%
100.00%
0
5
10
15
20
25
30
35
40
Q1 Q2 Q3 Q4 Q1 Q2 Q3
2023/24 2024/25
Moray Foster Carers
No. of Moray Council Fostering Households
No. of Moray Council Foster Carers with 'Active' placements
% of Foster Households who are 'active'
Page 372

Page 373

APPENDIX 1
14 | P a g e
At end of Fin Quarter 3 there were 52 children living in foster care, with 47 (90%) children
living with Moray Council foster carers and 5 (10%) living with independent foster carers. 
Those young people living with independent foster carers are all in long-term care with
Permanence Orders.  
Of our 36 fostering households, 86.1% are actively caring for a child.  Not all fostering
households have children living in their care.  At the end of Fin Quarter 3 this comprises 5
(13.8%) in total.  This is a small number due to family circumstances or matching
considerations of their registration approval where foster carers are inactive for a short
period of time.
The Fostering Team is undertaking work to broaden the approvals capacity of Moray foster
carers. This will enable them to care for a wider group of young people where they will be
provided with additional support and advice.    
Graph 18: Children who live in foster care   
Graph 18 identifies the number of children cared for by Moray foster carers, 47 which is a
slight increase from Fin Quarter 3 in 2023 which was 45.  However, this includes some
quarterly fluctuations where the pattern is relatively stable.  
The number of approved Moray foster carer households available for children has seen a
small decrease.  Although the carer recruitment campaign is resulting in new fostering
households, this is balanced by other foster households ceasing or changing the type of
fostering they provide. The challenge in recruiting and retaining foster carers is both a local
and national issue.  The carer recruitment campaign is significant in recruiting foster carers
accompanied by work to achieve greater retention rates.  This is focused on supporting
foster carers including improved supervision, training and finances.
Foster carers are graded by the level of skills learned and developed, ranging from Level 1 to
Level 4 being the highest.
The reporting process for Children and Families and Justice Social Work is developing which
includes reviewing its scope.  An area which is currently not reported on is Young Carers.
There are current discussions exploring what reporting is available and how this can be
purposefully presented within this report. It is planned for reporting in relation to Young
Carers to be available for Fin Quarter 4.        
44 43 45 47 45 48 46 45 47 46 51 51 50 48 47 47 47
11 11 7 7 7 7 7 6 6 6
6 6 6 6 6 6 5
0
10
20
30
40
50
60
Children in Foster Care
Local Authority Foster Care Foster with other orgs paid for by Local Authority
Page 373

Page 374

APPENDIX 1
15 | P a g e
Graph 19: Kinship carers 
Kinship care is split into two groups: pre-approved kinship homes awaiting presentation at
the Kinship Panel for approval and kinship households already approved at Panel.  Moray is
seeking to increase the numbers of kinship households.  This is to ensure more children and
young people can remain within their own communities and network of family and friends. 
It is envisaged that the numbers of kinship households will increase via the use of, for
example, Family Group Decision Making processes.        
Graph 20: Residential care
Residential care is divided into those in residential care in Moray and those out with Moray. 
Children cared for in Moray live in the authority's own children’s houses, Cala and Action for
Children’s two houses in Buckie and Elgin.  The figure for this category is 11.
Out of area care tends to be specialist residential houses or residential schools.  There has
been a consistent focus on providing this care in Moray where possible, so children remain
close to their families and support network.  The figure for this category is 12. 
30 32 29 31 32 30 29 30 31 29 29 29 29 28 30 28 25
30 29 26 26 32 34 32 31 30 32 33 32 32 31 33 31 32
10 14
14 16 11 7 9 10 12 9 7 8 8 8 9 9 5
0
10
20
30
40
50
60
70
80
Kinship Care Settings
Kinship: No. of Children in Pre-Approved Placements Kinship: No. of Children in Approved Placements
Kinship: No. of households providing Kinship Placements
13 14 14 14 13 12 13 12 12 13 13 12 11 10 12 12 11
11 11 11 11 11 11 11 10 10 11 11
9 9 11
12 12 12
0
5
10
15
20
25
30
Residential Care Settings
Residential Care Settings in Moray Residential Schools or Out of Area Care Settings
Page 374

Page 375

APPENDIX 1
16 | P a g e
Work is underway to reduce the number of young people in Out of Area care which is
expensive and does not geographically support young people in maintaining relationship in
Moray including health, education, family and friends.
Residential care settings can be the correct care setting for some children and young people,
often due to previous unsuccessful multiple family care arrangements. However, in most
cases, a family-based setting is preferrable as it better prepares young people for adulthood
as they have a positive model of family life. For those young people in residential care, there
is significant preparation via independent living skills to support them in the transition to
adulthood.      
Graph 21: Through care after care data 
As illustrated in Graph 21, as at 31 December 2024, there were 72 young people receiving
care from the Through Care After Care (TCAC) Team including nine receiving continuing care
support.
The team is divided into three sections: 
• Through Care: Young people receiving support to plan and prepare for
independence.
• After Care: Young people who have left care but are receiving continuing support. 
• Continuing Care: Young people who choose to remain where they live beyond their
18th birthday until they are 21 although it can be in place from 16.  These young
people cease to be formally looked after by Moray Council but are legally entitled to
continue living where they are. This provides stability in a familiar and nurturing
setting. There is a focus on continuing care to ensure young people in different care
settings are given the opportunity to remain where they are living potentially until
the age of 21.  This is a key responsibility for the organisation and partners as
corporate parents.   
The team is responsible for supporting New Scots (formerly Unaccompanied Asylum Seeking
Children) via the National Transfer Scheme.  This is an increasing workload for the team,
40 42
46
30
19 17
10 9 9
0
5
10
15
20
25
30
35
40
45
50
Oct-24 Nov-24 Dec-24
Through Care, After Care and Continuing Care
TCAC: Open as Through Care TCAC: Open as Aftercare TCAC: Open as Continuing Care
Page 375

Page 376

APPENDIX 1
17 | P a g e
which is dependent, in part, on the numbers of young people arriving in Kent, making future
forecasting a significant challenge.      
The team offers considerable support to young people after they leave care (After Care) up
to the age of 26. There is a commitment to offer the same support birth families provide for
young people who are transitioning into adulthood. This is a key element of Moray Council’s
and Health and Social Care Moray’s responsibilities as Corporate Parents.   
Justice and Youth Justice. 
Graph 22: Care experienced young people supported by Justice Services
Nationally, care experienced young people (CEYP) are overrepresented in the Scottish Justice
Systems.  At the end of Fin Quarter 3, 8.3% (44 of 532) were CEYP (up to age 26) within the
Justice System (Youth Justice 13, Justice Social Work 31) depicted in graph 22, showing an
increase of 1.1 percentage points from 7.2% at end of Fin Quarter 2.  
This figure has consistently remained below 12% throughout 2023/24 although the
percentage has risen since June 2024.  Work continues to identify CEYP and offer early
assistance and support where possible.  The aim is to address identified needs and risks to
reduce re-offending rates and maximise support to reduce the length of time they are
supported by justice services. Research informs that early entry or prolonged exposure to
the criminal justice system can draw young people into the system rather than rehabilitate
and divert from the system. 
435 424 421 424 403 415 422 450 440 449 443 466 472 478 477 492
44 42 42 44 42 43 39 37 35 31 34 34 36 40 40 44
0
1
2
3
4
5
6
7
8
9
10
0
100
200
300
400
500
600
Care Experienced People in the Justice System
Open to Justice Team Open to Youth Justice %  CEYP open to both MYJ and JS
Page 376

Page 377

APPENDIX 1
18 | P a g e
Graph 23: Ages of young people in Youth Justice 
The average age of a young person receiving Youth Justice services is 15 years old which has
remained consistent over the last two quarters.  Most work undertaken is with children aged
11 to 15-years-old, highlighting the need for the service to work alongside education services
to support young people to remain in education and meet their full potential.  
There were 12 Diversion from Prosecutions during Fin Quarter 3 for 16 and 17 year-old
young people with other work related to young people supported by Youth Justice Services
and co-worked with area team Social Work Services where short term intervention was
identified.  The highest number of referrals to the Scottish Children’s Reporter
Administration (SCRA) relate to alleged offences of vandalism, threatening or abusive
behaviour, shoplifting and fire raising.  Contributory issues include non-attendance at school,
community disorder involving peers and associates, lack of inclusive community resources in
evenings and weekends, and substances and alcohol use.
Whilst the team works with all schools throughout Moray, it has strong links with Moray
Social, Emotion and Behavioural Needs Service (SEBN) where support is offered for social,
emotional and behavioural needs.  Young people aged over 18 years in the Justice Social
Work Service, the Youth Justice Service usually has the most meaningful relationship with
the young person to more effectively offer support and planned transitions between Youth
Justice and Justice Social Work which can help minimise any impact on the young person.
33 29 31 30 24 22 22 27 21 22 21 21 21 21 21 25 28
00000000000000000000
14 15 14 15
15 14 15
14
13 16 13 15 10 7 7 8 9
00000000000000000000
2 0 0 0
1 1 1
3
4 2 2 1
0 1 0
3 3
00000000000000000000
49
44 46 46
41 38 39
45
38 40 36 37
32 30
35 36 40
0
10
20
30
40
50
60
Age Bands - Youth Justice
YJ: Age Band: 5-10 YJ: Age Band: 11-15 YJ: Age Band: 16-17 YJ: Age Band: 18+ YJ: No. open to Youth Justice
Page 377

Page 378

APPENDIX 1
19 | P a g e
Pie chart 6: Gender of young people in Youth Justice 
Pie chart 7: Gender of individuals in Justice Services
At the end of Fin Quarter 3, most individuals supported by Youth Justice were males
accounting for 87% of young people supported by the service.  There was a small increase
from the previous Quarter which will continue to be monitored to ensure programmes and
support offered are appropriate to address any emerging need from identified trends.
In Justice Social Work 13.6% of individuals supported by the service were females, which has
remained relatively static over the past year.  It is recognised women in the justice process
are more likely to have experienced trauma and are also more likely to be a sole carer for a
child or family member.  
In line with The Promise, Justice Social Work is committed to keeping women in their local
communities where it is safe to do so and provide robust alternatives to custodial sentences. 
Currently the team offers a gender responsive service which includes a weekly women’s
group and a woman only unpaid work group.  Support is offered in partnership with other
services to promote opportunities for individuals to engage with community resources which
will be available beyond their time within the justice service.   Work continues to capture the
views of individuals to evaluate the impact of this service and shape its development. 
35
5
Gender: Youth Justice
YJ Gender: Male YJ Gender: Female
425
67
Gender: Justice Service
Justice: Male Justice: Female
Page 378

Page 379

APPENDIX 1
20 | P a g e
Graph 24: Justice social work reports (JSWR) 
Justice Social Work reports (JSWR) remain a priority to reduce any delays in sentencing and
for Fin Quarter 3 the target of 100% on time has been met.  Whilst reports are prepared at
the request of any Court for an individual living in Moray, most reports are submitted to
Elgin Sheriff Court.  Over the last year these figures have remained stable, except for an
increase in Quarter 1, which was expected now Court business has returned to normal
following Covid related delays.  
Completion of Court reports on time results in appropriate sentencing for individuals which
addresses their current assessed risks and needs, and reduces time spent on remand where
a community sentence is imposed.  It also importantly supports a timely outcome for victims
of offences.
Pie chart 8: Justice Report Types 
In addition to a standard JSWR report the Court may request additional assessments such as
a Drug Treatment and Testing Order (DTTO) assessment and a Restriction of Liberty Order
(ROLO) assessment as shown in pie chart 8.  The imposition of a ROLO or DTTO can be a
104 104 106 103
130
107 107
96 96 90 94
121
95 95
100 100 100 100 100 100 100
0
20
40
60
80
100
120
0
20
40
60
80
100
120
140
Q1 Q2 Q3 Q4 Q1 Q2 Q3
2023-24 2024-25
Justice - SW Reports submitted on time
No. Social Enquiry Reports submitted on Time No. of People % of Reports on time
10, 9%
26, 25%
70, 66%
Types of Report
JSWR DTTO Assessment
JSWR ROLO Assessment
JSWR Standard
Page 379

Page 380

APPENDIX 1
21 | P a g e
direct alternative to custody so effective assessments for these Orders can offer a robust
community-based disposal.  
There has been an increase in the request for DTTO assessments during Fin Quarter 3.  A
DTTO is a disposal which focusses on drug treatment as the primary means of reducing
offending behaviour and the assessment for this is an intense six-week period of involving
support to stabilise an individual’s current situation, referrals to partner services where
appropriate, and regular appointments where drug testing is carried out alongside
therapeutic work. 
Graph 25: Structured deferred sentences (SDS) 
An SDS is a flexible provision with structured social work support for an individual after
conviction but prior to sentencing.  Successful completion of an SDS reduces the need for a
statutory Court Order, in turn reducing the overall length of time an individual is supported
by the service.  The number of in SDS disposals in Fin Quarter 3 has risen very slightly and is
comparable to Quarter 3 in the previous year. 
Graph 26: Bail supervision 
9 11 9
20 16 18 21 17 21
8 10
9 9 9
20
15 17
20
17
21
6
10
0
5
10
15
20
25
30
35
40
45
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3
2022-23 2023-24 2024-25
Structured Deferred Sentences
No. of Structured Deferred Sentences imposed No. of Individuals with SDS imposed
1
2 4 4
17
33 34 38
59 62 50
1 0
3 4 5
2
7
15
14 13
17
1 0 3
4
5 2
7 15
14 12 17
0
10
20
30
40
50
60
70
80
90
100
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3
2022-23 2022-23 2022-23 2022-23 2023-24 2023-24 2023-24 2023-24 2024-25 2024-25 2024-25
Bail Supervision
No. of requests from Court for Bail Supervision No. of Bail Supervision cases commenced
No. of individuals commenced with Bail Supervision
Page 380

Page 381

APPENDIX 1
22 | P a g e
Bail supervision is an alternative to remand and the priority for this in Moray is women,
young people, those with caring or parental responsibilities and those with issues relating to
mental health or addictions.  Assessments are undertaken for all people where bail is being
opposed by the Procurator Fiscal and are provided on the same day.  There is a slight
reduction in the number of assessments requested in Fin Quarter 3 and a slight increase in
bail supervision orders imposed.  There continues to be a significant number of assessments
which do not result in bail being opposed and work is being undertaken nationally to
understand trends, but data is not yet available to compare.  The prison population in
Scotland remains high, and bail supervision is one area of work which is hoped will assist in
reducing these numbers whilst offering more positive outcomes for individuals within their
local communities.
Graph 27: CPO with supervision requirement 
Fin Quarter 3 has again seen an increase in the imposition of Community Payback Orders
(CPO).  Most individuals made subject to a CPO are seen on the day of sentencing, for those
where this has not been possible, an appointment with their allocated social worker is made
within seven days of an Order being imposed.  There is a reduction in the target met during
this Quarter related to individuals not attending appointments and some interruption in
service in December which included a high level of staff sickness.
Diversion from Prosecution
Diversion from Prosecution (DfP) allows someone accused of offences to be dealt with
outside of the formal justice system. Successful completion of a diversion from prosecution
means an individual will not have a conviction for the alleged offence which may impact their
current or future employment or education alongside other significant areas of their life.
The Justice Social Work team undertakes all assessments of suitability; however, the Youth
Justice team aids and supports young people aged 16 and 17.  The referral rate varies which
is a result of the process of cases being marked by the Procurator Fiscal.  There can
occasionally be delays in the commencement of these cases where additional agreement is
required from the Procurator Fiscal, e.g. an extended period for completion.  
In Fin Quarter 3 the total numbers of assessments and cases commenced are smaller in
comparison to the previous year, however, there is no clear reason for this at this stage and
it will continue to be monitored.  New guidance from the Scottish Government is due
0
20
40
60
80
100
120
0
10
20
30
40
50
60
70
Q1 Q2 Q3 Q4 Q1 Q2 Q3
2023-24 2023-24 2023-24 2023-24 2024-25 2024-25 2024-25
CPOs with Supervision
No. of new CPOs with Sup Req No. seen by Supervisor within 7 days % Target Met
Page 381

Page 382

APPENDIX 1
23 | P a g e
imminently for DfP which will provide an opportunity to review local practice in line with the
new guidance.
Graph 28: Diversion from prosecution: Female 
Graph 29: Diversion from prosecution: Male 
6
5
8
5
2
1
3
4
1
0 0
4
0
1
2
1
0
1
2
3
8
2 2
5
2
3 3
1 1
0 0
4 4
01
2
3
8
2 2
5
2
1
2
1
0 0 0
2
4
0 0
1
2
3
4
5
6
7
8
9
0
1
2
3
4
5
6
7
8
9
Diversion from Prosecution: Female
DFP Gender: Female DFP Commencing Gender: Female DFP Completed Gender: Female
6
12
9
3
7
6
7
12 12
4
5
8
1
5
6
3
2
5
3
4
9
2
7
3
4
7
5
2
4
8
11
4
6
2
0
2
4
6
8
10
12
14
Diverson from Prosecution: Male
DFP Gender: Male DFP Commencing Gender: Male DFP Completed Gender: Male
Page 382

Page 383

APPENDIX 1
24 | P a g e
Policy, development, trauma-informed and commissioning. 
Staying Put- Moray’s Approach to Continuing Care
Young people who are looked after and accommodated have the right to
‘stay put’ in their long-term home arranged by the local authority until
they are ready to move on or reach their 21st birthday. This is called
continuing care. 
The Children and Families Social Work Policy Team has been working with
young people and professionals across the service to develop a procedure
outlining local arrangements for continuing care. 
The consultation with young people who are
currently in continuing care highlighted good
practice as well as the need for a leaflet that
explains the process. We worked with the
Champions Board and PR colleagues to ensure
that this need is met. 
The final draft of this procedure is now with
the Chief Social Work Officer. 
Trauma-Informed Practice
The Scottish Government’s vision for a trauma-informed nation includes a trauma-informed
and responsive workforce in public services. To achieve this, an organisation must look at all
its processes across several domains, both operationally and strategically, and assess them
alongside the principles of trauma-informed practice, which are: Safety, Trust, Choice,
Collaboration, and Empowerment. The table below highlights the organisational domains and
the key principles with which they align: 
Safety Trust Choice Collaboration Empowerment
Physical
environment 
Physical environment 
Screening, assessment and treatment services
Training and workforce
development  
Training and
workforce
development
Progress
monitoring and
quality assurance    
Financing   Financing 
Evaluation      
Engagement and involvement  
Cross sector collaboration   
Governance and leadership   
Policy 
“I did not notice any difference
during the transition. My
relationship with foster carers
remained the same.” (Young
person in continuing care)
Page 383

Page 384

APPENDIX 1
25 | P a g e
The Scottish Government funded the role of the Trauma Informed Development Officer (also
known as the Trauma Lead) to lead local authorities and their services through their own
assessment, identify areas of change, and support future development. 
To further this work for Moray, the Trauma Lead developed a two-pronged approach. The first
prong, focusing on awareness-raising, consists of an Introductory Brief which has been
delivered to a variety of services, including Children’s Social Work, Human Resources and
Organisational Development. The second prong, called a Walk-Through Lens of teams and
services, consists of an interactive session to identify what is working well and what needs to
be done to become trauma informed. 
Since October 2024, the Trauma Lead has been delivering these approaches, with engagement
across 47 teams and services to date. The pie chart below indicates progress in this area. 
Pie chart 9: Introduction brief 
Pie chart 10: Walk through lens 
Alongside the delivery of these sessions, the Trauma Informed Development Officer is leading
on the review of available training on trauma-informed practice for staff across Moray Council
and Health and Social Care Moray. The Q4 report shall cover the progress of this work. 
72%
9%
19%
INTRODUCTION BRIEF
Delivered Arranged To be arranged
15%
13%
72%
WALK THROUGH LENS
Delivered Arranged To be arranged
Page 384

Page 385

APPENDIX 1
26 | P a g e
Training and Development 
During this quarter, there was no formal training activity within Children and Families Social
Work, as the focus shifted towards end-of-year reflections and planning. However, key
evaluation and improvement initiatives progressed. 
Self-evaluation and Continuous Improvement:
Building on the initiation of the Children’s Services Self-Evaluation and Continuous
Improvement approach, Social Work Services has begun exploring single-agency self-
evaluation to identify areas for development and enhance practice as a starter for ten before
a wider children’s services self-evaluative approach. 
Additionally, work commenced to evaluate the implementation of the Graded Care Profile 2
(GCP2), a structured assessment tool designed to measure the quality of care a child receives
and identify neglect. An initial sense-check in the service suggested that GCP2 may not be
widely used in practice, highlighting the need for a more detailed review of its
implementation. This led to the development of a survey to gather practitioner insights,
forming the basis for further analysis in the next quarter. 
Improvement initiative:
As part of our work towards embedding a culture of continual learning and development, two
Learning from Practice development sessions took place for Children and Families and Justice
Services staff in November 2024.  A total of 111 staff attended the sessions with good
representation from all the teams. The sessions discussed the five key Social Work practice
themes identified from a desktop review of historic complaints findings outlined in the figure
immediately below: 
The sessions employed a conversation café approach which ensured staff were able to discuss
the learning from the themes and hear the views of colleagues from different teams.  The tone
of the day was positive and encouraged staff to think about what we do well and what we can
do better. 
The sessions generated lots of ideas and suggestions for improvement. These were collated
into an action plan, complete with arrangements for monitoring and evaluation, which will
contribute to the plan for continual improvement and self-evaluation. The plan is in its final
stages of development and shall be rolled out in the coming months.
Communication
(with children,
families and
professionals)
Timely actions
and practices
Processes
(missing,
outdated or not
followed)
The voice of
children, young
people and
families
Power imbalance
and governance
Page 385

Page 386

APPENDIX 1
27 | P a g e
The learning and development report from the sessions, including feedback, has been
distributed throughout the workforce. 
Commissioning 
The pie chart below identifies the seven main categories of the contracts held within the
Children and Families and Justice Services Commissioning Team and their percentage of the
budget.  These categories will be further discussed below. 
Pie chart 11: Contract categories 
Family support services
The family support category covers three services commissioned for prevention and early
intervention to avoid family breakdown and possible out of area care arrangements (Families
Action plan
Training and
support newly
qualified and
qualified social
workers
Streamlined
paperwork
Creating a
toolkit to
engage the
child’s voice
Page 386

Page 387

APPENDIX 1
28 | P a g e
Together, Functional Family Therapy, and Aberlour Youth Point Moray). Additionally, this
category includes the independent advocacy contract.
The three family support services have capacity for referrals which has been communicated
across the social work teams. A total of 108 children, young people and their families have
benefitted from these services during this quarter.  This is broken down in the illustration
below: 
Functional Family Therapy 
Functional Family Therapy is a short
term, strengths and family-based
therapy programme designed to help
families improve communication and
relationships. The families receive
therapy for a period up to six-months. 
This service is a prevention and early help
intervention programme which aids in
keeping families together.  The quotation
on the right demonstrated the changes
one family faced in the service.
Families Together 
This service delivers a restorative family service through a range of one to one and group
sessions.  It also offers a family focussed money advice service, the Family Group Decision
Making approach and practical support including food parcels and school bank referrals
amongst more. 
The service has reported 88 children and young
people (from 57 families) being positively
impacted following families being supported with
financial gains and debt management as part of
the Children First service.  The illustration on the
left breaks this area of work down to record the
impact. 
=10815
•Functional
Family Therapy
54
•Families
Together
39
•Aberlour Youth
Point Moray
“I must confess we had little expectations
before meeting you…we were so glad to
have met you and follow the programme
with all your support… to crack YP NAME
and Dad, gaining their trust is quite the
success…You have given us all hope for the
future”
Family Views on Functional Family Therapy
Page 387

Page 388

APPENDIX 1
29 | P a g e
The Family Group Decision Making process brings
together a child or young person’s extended family
and friends, providing a blame-free and future-
focussed culture, the main aim is to repair
relationships and improve the child or young
person’s support network.  The quote on the right
illustrates the impact on one family. 
Aberlour Youth Point Moray
Aberlour Youth Point Moray supports children and young people who struggle to remain
positively engaged within their home, school or community and who require a targeted
support service.  It also provides support to the parents of the children
and young people with whom they work.
To enhance the contract monitoring and gain the views and voice of
the young people and parents accessing the service, a Microsoft Form
was developed and issued on 9 December 2024.  The survey will close
on 6 January 2025, and results will be scrutinised and summarised in
the next report.
Independent Advocacy
Moray’s Children’s Right Service delivered by Quarriers is
available to all young people and their parents, carers,
brothers and sisters.  This quarter saw more referrals being
received for the parents, carers, brothers and sisters for the
first time since this contract started.  Overall, 189 young
people and 133 parents, carers, brothers and sisters benefitted
from the service.  These numbers include 60 children who are
looked after and 39 children and young people in need of
protection, as outlined on the right. 
Throughout this quarter, the provider has supported children,
young and their families in 56 meetings.  This is broken down below.   
Pie chart 12: LAC and CP
on current caseload 
Graph 30: Number of meetings independent advocates have attended 
“I feel listened to in the Family
Group Decision Making process”  
A Parents view on Families
Together 
“I don’t think she’d
(daughter) be here if
it wasn’t for
YouthPoint”
Parent Views on AYPM
Page 388

Page 389

APPENDIX 1
30 | P a g e
Children with a Disability - Support
Following a successful commissioning and tender process, the Children with a Disability -
Group Activities contract was awarded.  This contract commenced on 1 November 2024.  The
service aims to provide support and a natural short break for families.
Children with a Disability – Residential
There are currently three young people living in a residential care in Alba Place, Elgin, delivered
by Aberlour Child Care Trust.  This is a new contract which commenced 1 September 2024 and
the first quarterly contract monitoring will be due for the period 1 September 2024 – 31
December 2024 in January 2025.
Moray Residential Services 
At present there are 8 young people living in care settings in
Moray.  The contract expires on 31 March 2025.  Following the
evaluation process in November 2024, the incumbent provider
was successful in retaining the contract.  Implementation will begin
for the changes to the contract throughout Fin Quarter 4.  The
quote on the right was received from one young person.
Out of Area Residential Services
There are 21 young people living out with Moray.  Fifteen of them are in residential homes
and six are in foster homes or in continuing care with a variety of care providers across
Scotland.  These care settings form the 50% as described in the pie chart above.
Support for Unpaid Carers
Following discussions with the working group and evidence received through contract
monitoring, the Unpaid Carers contract is in the process of being varied to enable the
completion of Adut Carers Support Plans and Young Carers Statements to be brought in-
house. 
As shared at the Operational Management Team (OMT) on 6 December 2024, this will allow
Quarriers to develop more meaningful relationships with the unpaid carers through group
work, deepen relationships with schools, develop and short-breaks model as well as assess
and mitigate increasing unmet need.  This will also decrease the number of services people
interact with, whilst ensuring that their needs are met.
This has all been done in full collaboration with Quarriers, and the letter of variation (LOV) is
with them for final agreement and signature.
“I feel safe and secure
here”
Young Person in Residential
Home
Page 389

Page 390

Page 390

Page 391

Report to: Education, Children’s and
Leisure Services
Committee
Meeting Date: 13 May 2025      
Report by: Depute Chief Executive
(Education, Communities
and Organisational 
Development) 
Report No: EDU003/25/AH      
Author:  Andrew Hall Contact Email: learningestate@moray.gov.uk 
Subject: Universal Free School Meals Implementation – Status Update 
1.  PURPOSE 
☐ For Decision      ☒  For Information 
1.1  The report provides an update to Committee on the status of the Scottish Government (SG)
initiative to provide universal Free School Meals (FSM) for all primary school children as
requested at this Committee on 18 February 2025.  
1.2  This report is submitted to the Council in terms of Section III (D) (1) of the
Council's Scheme of Administration relating to all the functions of the Council
as an Education Authority. 
2.  SUMMARY  
2.1  The report updates the Committee on the status of the FSM initiative as requested at its
meeting on 18 February 2025. A further update will be provided following any update from
Scottish Government on the proposals and funding allocations for a full P6-P7 Free School
Meal implementation. 
3.  BACKGROUND AND CONTEXT  
3.1  Scottish Government and Local Authority Leaders reached a joint agreement in May 2021on
the implementation of a phased approach to the delivery of universal Free School Meals
(FSM) for all primary children. A phased introduction of universal and targeted FSM support
was planned from academic year 2021/22: 
• Phase One – July 2021 – Commencement of FSM holiday support to all children and
young people who are eligible for FSM on the basis of low income
• Phase Two – August 2021 – Expansion of Universal FSM to P4 children
Page 391

Page 392

• Phase Three – January 2022 – Expansion of Universal FSM to P5 children
• Phase Four – Aug 2022 – Expansion of Universal FSM to P6-P7 children 
3.2  A total of £49.75 million was allocated to local authorities in 2021/22, with the following
revenue funding, provided through a redetermination of the General Revenue Grant to local
authorities, was allocated in Moray in March 2022: 
• £250,000 – Phase One – FSM holiday support
• £525,000 – Phase Two and Three – expansion of universal FSM to P4 and P5. 
It was determined by Scottish Government that this would cover loss of revenue and
additional food costs for these two Phases of roll out. 
3.3  The Scottish Government budget for 2022/23 included a commitment of £30m of capital
funding for local authorities to continue the phased expansion of free school meal support
for primary children. In November 2022, Scottish Government wrote to local authorities
detailing the capital funding distribution, of which Moray was allocated £598,000. The
funding was to be used in 2022/23 to support the initial infrastructure that would be
incurred in the delivery the P5 expansion and for preparation for Primary 6 and 7 expansion.
However, given the timing of the financial offer and the degree of  understanding and
readiness of school meal capacity infrastructure requirements Scottish Government
approval was sought and given to reprofile funding into future years. 
3.4  Phases One to Three outlined in Para 3.1 been implemented within the time frame. Moray
currently has 1358 (68%) number of P4-P5 children accessing free school meals. To enable
this the following schools have had capacity improvement works related to either kitchen,
dining area or both: 
• Linkwood Primary School
• Applegrove Primary School
• Bishopmill Primary School
• Milnes Primary School
• New Elgin Primary School 
A detailed breakdown of works and spend to date on these schools is set out in Appendix 1. 
3.5  In March 2024, Moray was allocated a £19,142 capital funding to support the phased
expansion of free school meals to those in receipt of Scottish Child Payment (SCP) in
Primary 6 and 7 from February 2025. 
3.6  In September 2024, Moray was allocated further £92,000 capital funding to support this
same phased expansion of free school meals.  At the same time, Scottish Government
announced that there would be a delay to the roll out of universal FSM provision to Primary
6 and 7 children due to its financial challenges. It stated it was committed to the delivery of
universal FSM to primary school children and should funding become available from the UK
Government they would take steps to take the work forward to deliver the final phase of the
universal FSM. 
3.7  There are plans in development to address several minor capacity improvement
requirements to support the roll out of free school meals to Primary 6 and 7 pupils in receipt
Page 392

Page 393

of SCP which has been available in Moray from 3 Mar 2025. The current uptake is 70
children (as at 14 April 2025) from an estimated maximum of 360 across Moray.   
3.8  Detailed information on further school improvement requirements to meet both the future
increase in P6 and P7 in receipt SCP and the more significant potential universal FSM roll
out programme is set out in Appendix 2. This programme of works is planned for
completion over the next 2 years, with any significant construction works expected to
complete in summer 2026.  It should be noted that the estimated costs only include a small
allowance for electrical load upgrades for those identified kitchen equipment projects.
Should there be significant electrical upgrade works this may prejudice the completion of
all these projects. 
3.9  It should be noted that these works will not deliver all the capacity expansion requirements
for infrastructure and equipment to support a full roll out of universal FSM. To would require
central government funding to facilitate. 
4.  SUMMARY OF IMPLICATIONS  
4.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) ✓ 
Policy and Legal  ✓
Financial ✓ 
Risk ✓ 
Staffing  ✓
Best Value and Transformation  ✓
Property ✓ 
Information Communications Technology/Digital  ✓
Equalities. Social Inclusion and Economic Impact ✓ 
Climate Change and Biodiversity Impact  ✓ 
4.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute to
improved outcomes for communities as outlined in the following Council Plan strategic
priorities: 
☒ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following local
Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
Page 393

Page 394

☐ Empowering and connecting communities.
☒ Improving wellbeing of our population   
4.3  Policy and Legal 
There are no policy or legal implications arising from this report.  
4.4  Financial 
The General Revenue Grant to local authorities in March 2025 will continue to support P4-
P5 FSM. Additional budget of £597,442 was initially allocated to Catering from the Scottish
Government to provide for additional catering staff, meal production costs and loss of
external revenue. Education received £61,655 to fund additional lunchtime staff. 
A future P6-P7 roll out will require greater catering and dining room capacity together with
additional staffing to support delivery of an anticipated additional 1895 meals across Moray
primary schools. Although some of this works can be completed within existing Scottish
Government capital grant funding, further Scottish Government funding would be required
to complete all projects. These specific projects are those marked as ‘deferred’ in
Appendix 2 
Capital costs for refurbishments and upgrades that will support future anticipated
increases in capacity need is currently estimated at £1.2M, although over the next 2 years
there is expected to be some inflationary increases. 
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend this
Year
Virement
From
Other
Comments
x x x x x x 
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments
x x x x x x 
4.5  Risk 
The following key strategic risks have been previously identified and reported to Scottish
Futures Trust who are managing the Universal FSM programme on behalf of Scottish
Government: 
• The current capital funding would not support a future full roll out of Primary 6 and 7
pupils in Moray 
• A lack of sufficient Education and Catering staff resources to recruit to support future
additional meal production and delivery. 
• Should the Scottish Government go ahead with Primary 6 and 7 roll out of FSM we
would request that they re-evaluate the national cost per meal rate to produce the
maximum of 1895 FSM meals without additional costs to Moray.
Page 394

Page 395

4.6  Staffing  
Additional catering staff (20.41 FTE) and educational staff hours (7.5 hrs per primary school
per week) were needed to support the P4-5 FSM roll out. The additional education staff
hours required a change to the Devolved School Management (DSM) budget formula and
the September 2024 DSM scheme reflects this. 
A further review of catering staff and educational staff would be required for any future P6-7
roll out together with a likely further change to the DSM scheme to support this. 
A temporary 6 month 0.5 FTE administration support post has been requested by the
Benefits Service to support the Primary 6-7 SCP FSM rollout . The £16,882 to support this
has been approved within the allocated revenue budget but the post is yet to be filled. 
4.7  Best Value and Transformation 
There are no best value or transformation implications arising directly from this report.  
4.8  Property 
Property issues have been covered in the main body of the report.  
4.9  Information Communications/Technology/Digital 
There are no information communications/technology/digital impacts arising directly from
this report.  
4.10  Equalities, Social Inclusion and Economic Impact 
The implementation of universal FSM will support non-stigmatising provision of services
and supports health and well-being of our young people.  
4.11  Climate Change and Biodiversity Impacts 
There are no climate change or biodiversity implications arising directly from this report. 
5.  CONSULTATION  
5.1  This report has been prepared in consultation with Chief Finance Officer, Catering Manager,
Education Business Support Team, Legal Services Manager, HR Manager, Legal Services
Manager and Caroline O’Connor, Committee Services Officer and any comments made
have been incorporated into the report. 
6.  BACKGROUND PAPERS  
6.1  None   
Page 395

Page 396

APPENDIX 1
Spend to date to support P4-P5 Universal Free School Meal roll out 
Page 396

Page 397

APPENDIX 2 
Free School Meal Expansion Planned Programme of Works (2025/26 and 2026/27) 
Page 397

Page 398

Page 398

Page 399

Report to: Education, Children’s and
Leisure Services
Committee 
Meeting Date: 13 May 2025  
Report by: Depute Chief Executive
(Education, Communities
and Organisational
Development) 
Report No: EDU001/25/KD/AMB  
Author: Karen J. Delaney Contact Email: Karen.Delaney@moray.gov.uk 
Subject: Community Learning and Development Strategic Partnership Progress
Visit Outcome 2025 
1.  PURPOSE 
☐ For Decision      ☒  For Information 
1.1  The purpose of this report is to inform the Committee of the final sign off by His Majesties
Inspectorate (HMI) of the Improvement Actions carried out by the Community Learning
and Development Strategic Partnership (CLDSP) following the progress visit in October
2023.  
1.2  This report is submitted to Committee in terms of Section III  (D) (1) of the Council’s
Scheme of Administration relating to exercising all the functions of the Council as
Education Authority within the terms of relevant legislation with regard to nursery, primary
and secondary and further education; community learning and development and to
determine the Council’s policies in regard thereto. 
2.  SUMMARY  
2.1  The Progress Visit process of inspection by HMI into the CLD Strategic Partnership and
CLD local authority service has been completed and confirms they are satisfied with the
actions taken by partners. 
3.  BACKGROUND AND CONTEXT  
3.1  His Majesty’s Inspectorate (HMI) visited Moray in October 2023 in a shortened form of
inspection called a Progress Visit.  The outcome was fed back in an Information Report to
this Committee on 20 February 2024. HMI had requested an update in a year on areas of
improvement which was duly submitted in December 2024.  
Page 399

Page 400

3.2  In January 2025 HMI returned for two online meetings with the Moray Council CLD
management team and the CLD Strategic Partnership based on the submitted progress
report. 
3.3  As a result of the action taken by the CLDSP and their discussions, HMI will make no
further visits to Moray Council and it’s CLD partners in connection with the visit. The HMI
report was published on 18 February 2025.                                                 
4.  PROPOSALS  
4.1  Committee notes HMI endorsement of the progress made by the CLD Strategic
Partnership engaging learners and activists to demonstrate the strength of partnership
working on the continuous improvement journey embedded in the new Partnership CLD
Plan.  
5.  SUMMARY OF IMPLICATIONS  
5.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  x
Policy and Legal  x
Financial  x
Risk  x
Staffing  x
Best Value and Transformation  x
Property  x
Information Communications Technology/Digital            x
Equalities. Social Inclusion and Economic Impact   x
Climate Change and Biodiversity Impact  x 
5.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
Page 400

Page 401

☒ Empowering and connecting communities.
☒ Improving wellbeing of our population   
5.3  Policy and Legal 
The Council is meeting its statutory obligations through the CLD Strategic Partnership and
Communities CLD Team.  
5.4  Financial 
There are no additional financial implications with this report. 
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend this
Year
Virement
From
Other
Comments       
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments       
5.5  Risk 
The report endorses that we are meeting the requirements of the statutory guidance for
CLD within the scope of the progress visit.  
5.6  Staffing 
There are no staffing implications from this report.  
5.7  Best Value and Transformation 
A previous Best Value Thematic Report (27 October 2023) identified good practice in terms
of community engagement as an “area of strength for the Council” and “we are satisfied
community empowerment is reflected in the high level goals of the Council and is
embedded in strategic plans.”  
5.8  Property 
There are no implications from this report.  
5.9  Information Communications/Technology/Digital 
HMI noted the work being done by partners to enhance digital engagement in Moray as
demonstrated in the CLD Plan.  
5.10  Equalities, Social Inclusion and Economic Impact 
The external scrutiny reinforces that the CLD Strategic Partnership are mindful of their
responsibilities in meeting the needs of learners and activists.  
5.11  Climate Change and Biodiversity Impacts
Page 401

Page 402

There are no climate change or biodiversity implications arising from this report. It should
be noted that the new Partnership CLD Plan was developed with stakeholders and as a
result includes Climate Justice as a new cross-cutting theme. 
6.  CONSULTATION  
6.1  This report has been prepared in consultation with the Depute Chief Executive (Education,
Communities and Oranisational Development, Head of Education (Chief Education
Officer) and Head of Financial Services any comments made have been incorporated into
the report. 
7.  BACKGROUND PAPERS  
7.1  None. 
Page 402

Page 403

Moray Council Progress Visit Update – Submitted on 29 November 2024
Actions taken since the Progress Visit 
An Improvement Acton Plan was agreed by the CLD Strategic Partnership (CLDSP) in January 2024.
Governance reports went to the CPP Board and The Education Communities and Leisure Services
Committee (ECLS) culminating in the endorsement of the 2024-2027 Partnership CLD Plan which was
developed with increased  stakeholder involvement. 
Learner Link -Up sessions have enhanced peer support and given voice to ‘adult learners as equal
partners.’ Some learners confidently contributed in strategic settings such as a focus group on the
Independent Review of CLD and a bespoke session for ESOL learners around the New Scots
Integration Strategy 
The Youth Work Practitioner Network is developing well with an action plan created by young people at
a recent youth voice workshop supported by partners. The Council’s YW team has grown and as a
result there are improved partnerships being developed with community-based youth organisations. 
There has been increased youth voice engagement with the Champions Board for care experienced
young people. Corra Trust funding for new local Promise Groups has also been secured and shaped by
input from CLD youth groups. 
The role of CLD in raising attainment is increasingly recognised. A youth worker is seconded to New
Elgin Primary School through Strategic Equity Fund (SEF). A weekly youth club, delivered with Young
Leaders, has widened access to social and learning opportunities with most P7 pupils attending. 
The CLDSPs better reflects the diversity of Moray with two new core members. There are 1,771 military
pupils across schools (regular, reservists and veteran) with army families represented through The
Army Welfare Service. Mental Health and Wellbeing is a cross cutting CLD Plan theme -  Moray
Wellbeing Hub  are participating as a peer support organisation with active lived experience groups. 
We have increased our understanding of the range of CLD providers across Moray and have directed
resources through the MULTIPLY programme to fund new adult learning delivery partners (ENABLE,
Salvation Army, Lossiemouth Hub). A strong partnership approach to allocating Mental Health and
Wellbeing funding has also reached a new range of CLD providers. 
Data is being used effectively to target CLD resources at identified pockets of poverty. The Fairer Moray
Forum Action group are working to analyse feedback from the latest Inequalities in Moray report. 
Partners are working well to sustain and connect capacity building activities. Community-led hubs
meet to share experience and inform partners on emerging needs linked to poverty.  Moray Pathways
Partnership funding has been used to pilot a community hub in New Elgin. Work is developing to
promote community led digital hub spaces with SCVO. Partners are using Employability and Shared
Prosperity funding to support community spaces. 
Page 403

Page 404

The new CLD Plan articulates strategic drivers that inform partners and link directly back to priorities.
The plan recognises the increasing role that the ALISS local information system and tsi Moray
Community Map play strategically to improve signposting. Moray Wellbeing Hub host the  Discover
Pathways to Wellbeing to enhance signposting to support and services. 
Additional work like the “Remembering Together” Moray project has been externally evaluated and
recognised for partnership work and the second Moray Gaelic Language Plan delivered, building
capacity. 
Are there any outstanding issues and what are your plans to address these? 
Partners recognise that the ending of funding streams will reduce capacity to deliver and the impacts
of this will require ongoing review. 
Moray Community Planning Partnership are participating in a national self-evaluation with the
Improvement Service which includes challenge questions on how best to ensure that community
voice can influence policy and decision making – reinforced in our new CLD Plan. 
What are your next steps to ensure continuous improvement? 
The CLDSP will continue to monitor actions embedded in the new CLD Plan– extending the range of
partners involved and creating mechanisms to maximise community and learner voice. 
The CLD Service has an embedded Continuous Improvement Cycle. The staff Peer Review Session in
April 2024 and staff seminar in October 2024 both showed increased staff confidence to share, peer-
evaluate and confidently articulate how practice delivers on strategic priorities and relates to
competencies. 
CLDSP members are committed to annually reviewing the plan and gathering performance data which
demonstrates wider impact - taking a closer look at Quality Indicator 1:1 in spring 2025. 
Adult and Family Learning are the first team to pilot the Hanlon Management Information System.
Longer term, the intention is to widen access to the CLDSP to simplify how we gather Partnership KPI’s
and other impact evidence. 
Page 404