Democracy Spraffa

Agenda Document Pack - Education, Children's and Leisure Services Committee - 18/02/2025

Moray Council · 18 February 2025
Back to Education, Children's and Leisure Services Committee — 18 February 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Education, Children's and Leisure Services Committee 
Tuesday, 18 February 2025 
NOTICE IS HEREBY GIVEN that a Meeting of the Education, Children's and
Leisure Services Committee is to be held at Council Chambers, Council Office,
High Street, Elgin, IV30 1BX on Tuesday, 18 February 2025 at 09:30. 
BUSINESS 
1. Sederunt 
2. Declaration of Group Decisions and Members Interests
*
3. Minutes of meeting of 26 November 2024 7 - 16
4. Written Questions ** 
5.* Quarter 2 (July to September 2024) Performance Report
for Children and Families and Justice Services
Report by Interim Chief Social Work Officer/Head of Service  
17 - 44
6.* Education Revenue Budget Monitoring to 31 December
2024
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
45 - 50
7.* Early Learning and Childcare - Primary 1 Admissions
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
51 - 62
Page 1

Page 2

8.* Education Scotland Inspection of St Gerardine Nursery
Lossiemouth
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
63 - 68
9.* Education Scotland Inspection of Findochty Primary
School
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
69 - 76
10.* Initial Analysis of Achievement of Curriculum for
Excellence Levels 2024
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
77 -
100
11.* Additional Support Needs Allocations
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
101 -
116
12.* Education Resources and Communities Revenue
Budget Monitoring to 31 December 2024
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
117 -
120
13.* Education Resources and Communities and Education
Capital Budget Monitoring to 31 December 2024
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
121 -
134
14.* Learning Estate Working Group
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
135 -
140
15.* Education Digital Infrastructure Readiness Update
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
141 -
146 
Only items marked * can be considered and determined
by all members of the Committee   
Page 2

Page 3

Information Reports - Not for Discussion at this Meeting
Any member wishing to call in a noting or information report from one
meeting shall give notice to Committee Services at least 48 hours
before the meeting for which the report is published. The Notice shall
be countersigned by one other elected member and shall explain the
reason for call in including any action sought. 
Information Report - Primary and Secondary School
Capacity and Occupancy 2024-25
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
147 -
158 
Summary of Education, Children's and Leisure Services
Committee
To exercise all the functions of the Council as Education Authority
within the terms of relevant legislation with regard to school education,
nurseries and child care, Gaelic, children’s services, leisure, libraries
and museums, sport and the arts, CLD, life long learning, youth justice
and child protection.         
Watching the Meeting
You can watch the webcast live by going to: 
http://www.moray.gov.uk/moray_standard/page_43661.html    
Webcasts are available to view for 1 year following the meeting.  
You can also attend the meeting in person, if you wish to do so,
please come to the High Street entrance door and a member of
staff will be let into the building. 
Page 3

Page 4

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how
the individual or members of the group will vote on any item(s) of business on
the Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any
relevant and competent business within the specified remits not already on the
agenda, to the Chair provided it is received by the Proper Officer or Committee
Services by 12 noon two working days prior to the day of the meeting.  A copy
of any written answer provided by the Chair will be published on the Council’s
committee management system by 4pm the day before the meeting.  The
Member who has put the question may, after the answer has been published,
ask one supplementary question directly related to the subject matter at the
meeting, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the
consent of the Chair. If a Member does not have the opportunity to put a
supplementary question because no time remains, then he or she can submit it
in writing to the Proper Officer who will arrange for a written answer to be
provided within 7 working days. 
Page 4

Page 5

MORAY COUNCIL 
Education, Children's and Leisure Services Committee 
SEDERUNT 
Councillor Kathleen Robertson  (Chair)
Councillor Bridget Mustard  (Depute Chair)  
Councillor James  Allan  (Member)
Councillor John Cowe  (Member)
Councillor John Divers  (Member)
Councillor Juli Harris  (Member)
Councillor Sandy Keith  (Member)
Councillor Elaine Kirby  (Member)
Councillor Scott Lawrence  (Member)
Councillor Marc Macrae  (Member)
Councillor Paul McBain  (Member)
Councillor Shona Morrison  (Member)
Councillor Derek Ross  (Member)
Councillor Sonya Warren  (Member)  
Mrs Sheila Brumby  (Non-Voting Member)
Mrs Anne Currie  (Non-Voting Member)
Ms Jillian MacKellar  (Non-Voting Member)
Mr Ruaridh Murray  (Non-Voting Member)
Reverend Tembu Rongong  (Non-Voting Member)
Mrs Susan Slater  (Non-Voting Member)
Mrs Emma Tunnard  (Non-Voting Member)
Clerk Name: Caroline O'Connor
Clerk Telephone: 07779 999296
Clerk Email: committee.services@moray.gov.uk 
Page 5

Page 6

Page 6

Page 7

MORAY COUNCIL 
Minute of Meeting of the Education, Children's and Leisure Services
Committee 
Tuesday, 26 November 2024 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor James  Allan, Mrs Sheila Brumby, Councillor John Cowe, Mrs Anne
Currie, Councillor John Divers, Councillor Juli Harris, Councillor Sandy Keith,
Councillor Elaine Kirby, Councillor Scott Lawrence, Ms Jillian MacKellar, Councillor
Marc Macrae, Councillor Paul McBain, Councillor Shona Morrison, Councillor Bridget
Mustard, Councillor Kathleen Robertson, Reverend Tembu Rongong, Councillor
Derek Ross, Mrs Susan Slater, Mrs Emma Tunnard, Councillor Sonya Warren 
APOLOGIES 
Mr Ruaridh Murray 
IN ATTENDANCE 
Interim Chief Social Work Officer and Head of Service; Annie Hunter, Social Work
Service Manager; Early Years Service Manager; Quality Improvement Manager;
Head of Education; Programme Manager (Learning Estate); Sport and Culture
Service Manager; Eily Webster, Principal Planning Officer; Legal Services
Manager; Senior Solicitor (Litigation and Social Care) and Caroline O'Connor,
Committee Services Officer. 
1.         Chair 
The meeting was chaired by Councillor Kathleen Robertson.  
2.         Welcome 
The Committee joined the Chair in welcoming Councillor Elaine Kirby to her first
meeting since being elected and Sheekha Saha, Senior Solicitor (Litigation and
Social Care) to her first meeting as legal adviser.  
3.         Declaration of Group Decisions and Members Interests * 
In terms of Standing Orders 21 and 23 and the Councillors' Code of Conduct, there
were no declarations from Group Leaders or Spokespersons in regard to any prior
decisions taken on how Members will vote on any item on the agenda or any
declarations of Member's interests in respect of any item on the agenda.  
With regard to Item 16 "Education Scotland Inspection of Elgin Academy" ,
Reverend Rongong stated, for transparency, that he was the parent of children
who attend the school and would be taking part in the debate.  
4.         Resolution 
Item 3.
Page 7

Page 8

The meeting resolved that in terms of Section 50A (4) and (5) of the Local
Government (Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Items 23, 24 and 25 of business
on the grounds that it involves the likely disclosure of exempt information of the
class described in the relevant Paragraphs of Part 1 of Schedule 7A of the Act.  
Para Number of
the Minute Para Number of Schedule 7a
25 Para 1
Information relating to staffing matters
26
Para 8 and 9
Information on proposed terms and/or expenditure to be
incurred by the Authority 
27
Para 4
Information relating to any applicant or recipient of any
financial assistance provided by the Authority 
5.         Minutes of meeting of 17 September 2024 
The minutes of the meeting of the Education, Children's and Leisure Services
Committee dated 17 September 2024 were submitted and approved.  
6.         Order of Business 
In terms of Standing Order 29, the meeting agreed to vary the order of business
set down on the agenda to take Item 5 "Written Questions" after the interval to
allow printed copies of the Written Question to be shared with those members of
the Committee who had not received copies.
.
7.         Quarter 1 Performance Report for Children, Families and Justice
Services 
The meeting had before it a report by the Chief Social Work Officer informing the
Committee on Children and Families and Justice Social Work performance as at
Quarter 1.  
Following consideration the Committee unanimously agreed to:-  
(i) note the performance of local indicators for Quarter 1 as presented in the
Performance Report at Appendix 1; and 
(ii) note the analysis of the local indicators as detailed in Appendix 1.  
8.         Performance Report (Education) - Period to September 2024 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing the Committee of the
performance of the service for the period to 30 September 2024.  
Following consideration the Committee unanimously agreed to:-  
(i) note the performance in the areas of Service Planning, Service Performance
and other related data to the end of September 2024; and 
Page 8

Page 9

(ii) note the actions being taken to improve performance where required.  
9.         Education Revenue Budget Monitoring to 30 September 2024 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing the Committee of the
revenue budget position for Education as at 30 September 2024.  
In response to a question from Councillor Harris relating to the out of area
placement budget and whether there had been any progress to reduce the budget
by the creation of new facilities which had been mentioned at a previous
committee, the Head of Education advised generally the overspend was outwith
the control of the Council in terms of decisions made by the Children's Reporter or
through court proceedings.  She confirmed she was working closely with the
Interim Chief Social Work Officer to scrutinise assessments and decisions taken
regarding young people out of area to evidence whether they are still valid and
whether the out of area placement is the best place for individual young people.
She further advised a confidential report was being prepared for the next meeting
of the Committee with specific details.      
Following consideration the Committee unanimously agreed to note the budget
position as at 30 September 2024.  
10.         Education Scotland Inspection of Hopeman Nursery 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing the Committee of the
outcomes of the recently published report on a Moray Early Learning and
Childcare (ELC) setting following inspection by Education Scotland.  
Following consideration the Committee unanimously agreed to note the contents of
the report and findings of Education Scotland following their inspection.  
11.         Education Scotland Inspection of Rothes Nursery 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing the Committee of the
outcomes of the recently published report on a Moray Early Learning and
Childcare (ELC) setting following inspection by Education Scotland. 
Following consideration the Committee unanimously agreed to note the contents of
the report and findings of Education Scotland following their inspection.  
12.         Education Scotland Inspection of Bishopmill Primary School 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing the Committee of the
outcomes of the recently published report on a Moray school following inspection
by Education Scotland His Majesty's Inspectors of Education (HMIE).  
Following consideration the Committee unanimously agreed to note the contents of
the report and findings of Education Scotland HMIE following their inspection visit.  
13.         Education Scotland Inspection of Greenwards Primary School 
Page 9

Page 10

The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing the Committee of the
outcomes of the recently published report on a Moray school following inspection
by Education Scotland His Majesty's Inspectors of Education (HMIE).  
Following consideration the Committee unanimously agreed to note the contents of
the report and findings of Education Scotland HMIE following their inspection visit.  
14.         Education Scotland Inspection of Rothes Primary School 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing the Committee of the
outcomes of the recently published report on a Moray school following inspection
by Education Scotland His Majesty's Inspectors of Education (HMIE).  
Following consideration the Committee unanimously agreed to note the contents of
the report and findings of Education Scotland HMIE following their inspection visit.  
15.         Education Scotland Inspection of Hopeman Primary School 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing the Committee of the
outcomes of the recently published report on a Moray school following inspection
by Education Scotland His Majesty's Inspectors of Education (HMIE).  
Following consideration the Committee unanimously agreed to note the contents of
the report and findings of Education Scotland HMIE following their inspection visit.  
16.         Education Scotland Further Inspection (Continuing Engagement) of
Portgordon Primary School 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing the Committee of the
outcomes of the recently published report on a Moray school following inspection
revisit by Education Scotland His Majesty's Inspectors of Education (HMIE).  
Whilst noting improvements require to made which would take time to be realised,
members of the Committee acknowledged the work of staff both within the school
and from the central support staff to action the further improvements identified in
the action plan.  
Following consideration the Committee unanimously agreed to:-  
(i) note the contents of the report and findings of Education Scotland HMIE
following their inspection visit; 
(ii) note that a clear and revised action plan is in place to acknowledge areas
where progress has been made and in order to focus on areas for
improvement requiring further attention; 
(iii) note that support will continue from the Quality Improvement Team in order to
realise further improvements required following change in school leadership;
and 
Page 10

Page 11

(iv) note that following future revisit from Education Scotland HMIE (anticipated by
September 2025), a further paper will then be brought to this Committee in
order to provide an update on school progress with improvements.  
17.         Education Scotland Inspection of Elgin Academy 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing the Committee of the
outcomes of the recently published report on a Moray school following inspection
by Education Scotland His Majesty's Inspectors of Education (HMIE).  
In response to a question from Councillor Keith asking where Councillors sit in
terms of stakeholders for school inspection reports, the Head of Education advised
inspection reports are shared with Elected Members before being published.  She
confirmed in the past, where less positive inspection reports have been received,
Elected Members briefings have been held to highlight any specific issues which
may have impacted on the findings from Education Scotland and such briefings
could be considered in those instances if thought to be beneficial.  Councillor Keith
thanked the Head of Education and agreed such briefings would be helpful to
enable Elected Members to understand the issues and improvement work being
undertaken so they are able to respond to queries from constituents.     
Following consideration the Committee unanimously agreed to:-  
(i) note the contents of the report and findings of Education Scotland HMIE
following their inspection visit; and 
(ii) note that following future revisit from Education Scotland (anticipated April
2025), a further paper will be brought to this Committee in order to provide
update on school progress with improvements required.  
18.         Initial Analysis of Secondary School Attainment - Session 2023-2024 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) reporting on the attainment of
secondary schools in Moray for session 2023/2024 further to National Insight
benchmarking toolkit update in September 2024 and central attainment data
analysis and review.  
Councillor Mustard, following on from the request from Councillor Keith for more in
depth understanding of inspection reports, asked whether there was correlation
between inspection reports and attainment.  In response, the Head of Education
confirmed there was a link evidenced by the Elgin Academy inspection report.  
As a follow-up question, Councillor Mustard if information could be gathered to
provide analysis and understanding of the impacts of external tutors and whether
there were unintentional consequences for those who could not afford tutors.  In
response, the Head of Education advised the main issues of concern which were
having a huge impact on attainment related to the inability to recruit teaching
specialists for core subjects.  The lack of teaching specialists also has a huge
impact on the workload of principal teachers who arrange cover for classes along
with senior leaders working through the absence management process because of
the stress impacting on staff within schools.  Councillor Mustard thanked the Head
of Education for the full explanation and reiterated that it would be of assistance if
engagement could take place with Elected Members to ensure they fully
Page 11

Page 12

understand the impacts and the work being undertaken to raise attainment to allow
better strategic discussion at Committee.  The Head of Education confirmed a
briefing on attainment had previously been done for Members and she would
discuss with the Depute Chief Executive the most appropriate method of
engagement to provide detailed information.     
Mrs Slater noted in the past briefings on the staffing situation had been provided at
the end of Committees and suggested it may be worth reintroducing the briefings
given how many vacancies were outstanding.  In response, the Head of Education
confirmed she was happy to provide confidential briefings on staffing in schools at
the end of future Committees.  
In respect of Moray College courses referenced at 3.51 and 3.52 in the report, Mrs
Slater asked which of the courses were running in the 2023/24 session given the
concerns raised regarding areas of the curriculum that schools are unable to
offer.  In response, the Quality Improvement Manager advised the college offer
remains largely unchanged with some normal adjustments however he would
provide an update to members of the Committee. 
Following consideration the Committee unanimously agreed to:-  
(i) note the position in respect of attainment of the young people in Moray for
session 2023/2024; 
(ii) note that initial performance discussions with Head Teachers too place during
August and September 2024 involving review of attainment position for each
secondary school and identification of actions for improvement required; 
(iii) note that a future meeting of this Committee, a follow-up insight report will be
presented in consideration of school leaver data including post-school
destinations following data publication in February 2025; and 
(iv) review and agree key interventions now planned an/or underway in support of
raising attainment and achievement for young people across all secondary
schools through identified actions and secondary Stretch Aims set and
previously reported to Committee.  
19.         Federation Policy for Schools 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) seeking Committee approval to
further review and update the Policy which was adopted by Committee in March
2024.  
Following consideration the Committee unanimously agreed to:-  
(i) the proposed change in one of the principles as laid out in para 3.6; and 
(ii) adopt this updated policy for any future vacancies across schools from 1
January 2025.  
20.         Performance Report (Education Resources and Communities) -
Period to September 2024 
Page 12

Page 13

The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing the Committee of the
performance of the service for the period to 30 September 2024.  
Following consideration the Committee unanimously agreed to:  
(i) note performance in the areas of Service Planning, Service Performance and
other related data to the end of September 2024; and 
(ii) note the actions being taken to improve performance where required.  
21.         Education Resources and Communities Revenue Budget Monitoring
to 30 September 2024 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing the Committee of the
budget position for Education, Resources and Communities as at 30 September
2024.  
Following consideration the Committee unanimously agreed to note the budget
position as at 30 September 2024.  
22.         Education Resources and Communities Capital Budget Monitoring
Report to 30 September 2024 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing Committee of the capital
budget position for Education, Resources and Communities and Education as at
30 September 2024.  
In response to a question from Councillor Mustard relating to the expected carry
forward of £493,000 in respect of Universal Free School Meals, and whether it
would be the subject of a separate report on the expansion of the project, the
Programme Manager (Learning Estate) confirmed a separate report on that
subject would be provided to Committee.      
Following consideration the Committee unanimously agreed to note the capital
budget position as at 30 September 2024.  
23.         Information Reports - if called in 
The Committee noted that no Information Reports had been called in.  
24.         Written Questions ** 
Under reference to Standing Order 36 a written question from Council Fernandes
was submitted in the following terms:  
Fit Life Direct Debits  
After reconciling the records between the Fit Life membership software and the
finance system, users whose direct debits were not set up correctly are being
invoiced for the full Fit Life membership fee for the period owed.  
Page 13

Page 14

Could you provide a breakdown of the following:
• The total amount due
• The number of users who have been invoiced
• The highest amount owed by a single user
• Whether any payment plans or instalment options have been arranged?  
RESPONSE 
• The total amount due equates to £32,621 over the 5yr period
• The total number of users who have been invoiced is 41
• The highest total amount owed by a single user is £2,904
• All individuals that have been invoiced have the option to set up a payment plan
with finance to pay these invoices.  
The press were asked to leave the meeting.  
25.         Additional Support Needs Review - Update on Progress [Para 1] 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisation Development) informing the Committee of updates
with regards to the ongoing Additional Support Needs (ASN) Review within the
Education service.  
Following consideration the Committee unanimously agreed to:-  
(i) endorse progress to date and emerging impact on the roll out of mandatory
training; 
(ii) agree the proposed change management plans for review of the English as an
Additional Language (EAL) Service and the Sensory Education Service; and 
(iii) endorse the progress made on other aspects of the review and seek a further
update before the end of the academic year. 
26.         Learning Estate Programme - Elgin High School Capacity Expansion
Project Update [Paras 8 and 9] 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing the Committee of the
current status and progress on the Elgin High School capacity extension project.  
The Programme Manager (Learning Estate) advised further information had been
received since the report was drafted and asked recommendation (iv) be amended
to remove the text "and instruct officers to write to the Scottish Government
requesting a formal extension to the Learning Estate Investment Programme
Phase 2 agreed operational completion date for the new build of up to 12 months
(Para 5.6)".  
Following consideration and there being no one otherwise minded, the Committee
unanimously agreed to:-  
(i) note the progress made on the Elgin High School capacity expansion project
(Paras 4.2-4.3); 
Page 14

Page 15

(ii) note the estimated associated costs for the current stage of the project through
to project completion (Para 6(c)); 
(iii) note the impact of the current school roll forecast figures for the Elgin High
School Associated School Group (ASG) area (Paras 4.4-4.12); 
(iv) approve a 12 month project delay before the commencement of Hub Stage 2
(Detailed Design) while the accuracy of the new census school roll forecast
information is fully assessed and confirmed (Para 5.4); 
(v) the repurposing design assessment work to the existing main school building
continue during the review period (Para 5.7); and 
(vi) a further report being submitted to Committee on or before November 2025
with recommendations on how to proceed (Para 5.5). 
27.         Moray and Nairn Educational Trust - Disbursement 2024-2025 [Para
4] 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) providing information and seeking
approval for the payment plan to be used to assess applications to the Moray and
Nairn Educational Trust and considering applications to the trust. 
Following consideration the Committee unanimously agreed to approve grants at
the rates provided in the payment plan. 
Page 15

Page 16

Page 16

Page 17

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 18 FEBRUARY 2025 
SUBJECT: QUARTER 2 (JULY TO SEPTEMBER 2024) PERFORMANCE
REPORT FOR CHILDREN AND FAMILIES AND JUSTICE
SERVICES 
BY:  INTERIM CHIEF SOCIAL WORK OFFICER/HEAD OF SERVICE 
1. REASON FOR REPORT 
1.1 To inform the Committee on Children and Families and Justice Social Work
performance as at Quarter 2. 
2. RECOMMENDATION 
2.1 It is recommended that Committee:- 
i) scrutinise and note the performance of local indicators for Quarter
2 as presented in the Performance Report at Appendix 1; and 
ii) note the analysis of the local indicators as detailed in Appendix 1. 
3. BACKGROUND 
3.1 The purpose of this report is to inform the Education, Children and Leisure
Services (ECLS) Committee of the quarterly performance data which provides
the analysis of the delivery of Children and Families and Justice Social Work
services. 
3.2 Appendix 1 identifies local indicators for the Council and the functions
delegated by NHS Grampian and Moray Council of Children and Families and
Justice Social Work services to allow wider scrutiny by the Committee. 
4. SUMMARY 
4.1 Work is underway to develop and agree the refresh of Moray’s key
performance indicators to enable local data to be recorded and measured
against the national performance indicators. 
4.2 Appendix 1 provides a summary and the historical trends. 
• Child Protection activity
Item 5.*
Page 17

Page 18

• Looked after Children 
• Justice and Youth Justice 
4.3 Statistics for Child Protection activity are provided against the academic
calendar which runs from August to July annually. This is because this data is
gathered and analysed by the Children Services Partnership and reported to
the Child Protection Committee (CPC) through the Child Protection Minimum
Data Set. Appendix 1 begins with Child Protection Q4 from page 1 to 10,
Financial Q2 data is from page 11 to 24. Any trends or anomalies in this data
are considered through the CPC Data subgroup and reported accordingly. 
4.4 Statistics for Looked After Children, Justice and Youth Justice are reflected
across the financial calendar which runs from April to March which is the
reporting calendar for this data. A summary of performance for each of the
reporting categories is provided below. 
Child Protection activity 
4.5 At the end of this Child Protection (CP) Quarter 4, 66 children were registered
on the Northeast Child Protection Register (NECPR) at a rate of 3.7 per 1,000
of 0–17-year-olds within the population.  The national and comparator data
will be available at the end of the CP year (after August 2025) which will
enable the data to be benchmark at that point. 
Looked After Children
4.6 At the end of Financial (Fin) Quarter 2, the number of looked after children
(175) was 9.9 per 1,000 of 0–17-year-olds within the population (total:
17,668). This is lower than the national average which is 12.3 based on the
most recent comparator statistics which date from 2022-23. This figure
includes 9 Unaccompanied Asylum-Seeking Children (UASC) and 6 children
who are cared for on a part time basis (Short Breaks). 
4.7 90% (47/54) of children in foster care are cared for by Moray Council foster
carers. The Carer Recruitment Campaign continues to focus on recruitment of
foster carers and supported lodgings carers. Resultantly, there has been an
improved ability to have children and young people cared for by Moray
Council foster carers. Thus, reducing the need to purchase external agency
care. The Carer Recruitment Campaign is continuing where it is anticipated
that the use of in-house carers will increase.         
4.8 The target for children living with kinship carers is adjusted annually to the
median of comparator authorities which was 25.1% for 2021/22 (this is a more
than target based on the assumption Kinship care is preferable, where it is
safe and appropriate, to non-family care). Currently 24% of looked after
children in Moray are in approved Kinship care with family members. Moray is
currently 0.1% below this median. 
4.9 16% of Moray’s Looked After Children are cared for in residential care. The
target for this indicator (this is a less than target based on the assumption
foster care and kinship care is the preferred option, when it is safe and
appropriate, where possible) is adjusted annually to the median of comparator
authorities (17.5% 2022/23). This figure includes 6 young people who are
cared for on a part time (Short Breaks) basis. For illustrative purposes on
Page 18

Page 19

performance, excluding those who have Short Breaks, (children and young
people who are in the care of their families) the figure is 13% which is 5.5%
lower than the National comparator median. Overall, Moray are 1.5% lower
than the National comparator. 
4.10 90% of brothers and sisters remain together in care settings. The Maintaining
Relationships Project is developing an approach and policy to ensure that
brothers and sisters are able to remain together as far as possible and where
this is their assessed needs.   
4.11 For Unaccompanied Asylum-Seeking Children, Moray has not adopted the
model used by other local authorities of using residential homes. The Moray
model comprises of a combination of local authority housing and supported
lodgings care settings. As such, the uncertainty regarding the future numbers
of Unaccompanied Asylum-Seeking Children should not have an impact on
residential care capacity for Moray. 
4.12 Statistically it is difficult to ascertain how other authorities record their
numbers as the level of detail is not readily available. While nationally
significant, the numbers of looked after children are comparatively small which
can provide significant percentage variance. An example of this is that in
Moray, all Unaccompanied Asylum-Seeking Children (UASC) and Short-term
breaks are included within our Looked After numbers. The service is aware
not all comparator authorities do this and is currently undertaking an exercise
to consider what our comparator authorities record. 
Justice and Youth Justice 
4.13 At the end of Financial (Fin) Quarter 2, there were 502 people open to Justice
Services of whom 36 are care experienced young people (CEYP) (Youth
Justice 12 and Justice 24). 
4.14 Overall, the number of CEYP in both Justice Social Work and Youth Justice
has been on a reducing trend from 13% at the end of March 2021 to 7.2% at
the end of Fin Quarter 2.  Work continues to identify and support care
experienced young people within these services, to offer early support where
possible and reduce the risk of re-offending. 
4.15 The majority of individuals supported by Youth Justice and Justice Social
Work are male (87% Justice Social Work, 93% Youth Justice).  Gender
responsive support is offered to females taking account of research and data
indicating women in the justice system are more likely to have experienced
trauma and more likely to be a sole carer for a child or family member. 
4.16 The Justice Social Work Service submitted 100% of reports to Court by their
due date.  This includes requests from Moray’s local Court and nationally. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP) and Moray Integration Joint
Board Strategic Plan “Partners in Care 2022 – 2032”
Page 19

Page 20

This report notes a review of key performance indicators is currently
being developed in respect of the wider service functions which will align
with key priority areas across the Children’s Services partnership. 
(b) Policy and Legal
None arising as a direct result of this report. 
(c) Financial implications
None arising as a direct result of this report. 
(d) Risk Implications and Mitigation
None arising as a direct result of this report. 
(e) Staffing Implications
There are no proposed changes to the staffing or reporting
arrangements. 
(f) Property
None arising as a direct result of this report. 
(g) Equalities/Socio Economic Impact
None arising as a direct result of this report. 
(h) Climate Change and Biodiversity Impacts
None arising as a direct result of this report. 
(i) Directions
None arising as a direct result of this report. 
(j) Consultations
Children and Families and Justice Social Work Senior Management
Team, Chief Officer and Caroline O’Connor, Committee Services Officer
have been consulted and their comments have been incorporated into
the report. 
6. CONCLUSION 
6.1 This report provides Committee with an overview of the performance of
specified local and National indicators. 
Author of Report: Jim Lyon, Interim Chief Social Work Officer/Head of
Service
Background Papers: Appendix 1
Ref: SPMAN-305227695-161 
SPMAN-305227695-162 
Page 20

Page 21

APPENDIX 1
1 | P a g e
CHILDREN AND FAMILIES AND JUSTICE SOCIAL WORK - QUARTER 2 (JULY-SEPT
2024) PERFORMANCE REPORT  
PLEASE NOTE THIS REPORT IS SPLIT INTO TWO SECTIONS. THE FOLLOWING SECTION USES
THE ACADEMIC CALENDAR (1 AUG – 31 JULY).  THE INFORMATION PRESENTED REPRESENTS
CP QUARTER 4 WHICH IS LATEST AVAILABLE DATA (MAY TO JULY 24).
At the end of the CP Quarter 4, 621 referrals were made into the Access Team for 478
children (as per graph 1).  
Graph 1: CP Quarter 4 - Referrals received by Access Team
The potential referral
routes are Social Work,
SCRA, Police, Courts,
Education, Health, 3rd
Sector, community,
family and young person. 
When a referral has been
received it can be
categorised as:
IRD – immediate child
protection concerns.
Enquiry – information
gathering to determine
next steps (if any).
Assessment – team will
conduct an initial assessment of needs.
Pie chart 1: Sources of referral 
224
182
215
174
149 155
0
50
100
150
200
250
May-24 Jun-24 Jul-24
Referrals
No of referrals in last month No of children
Item 5.*
Page 21

Page 22

APPENDIX 1
2 | P a g e
In CP Quarter 4, 47.3% of the referrals were made by the Police (294), followed by Education
11.1% (69), Health and Social Work 16.6% (103), Family and or Anonymous 14.5% (90), and
10.5% coming from other professionals (65) (as per pie chart 1).  Where the number of
referrals are higher than the number of children, this can be attributed to the fact there can
be multiple sources of referrals about a child (e.g. Health, Education and Police).  This
potentially reflects consistent thresholds across the partnership. 
Initial Referral Discussions (IRDs) are a multi-agency decision making forum where
information is shared and considered between partnership representatives regarding
potential or actual risk of harm to children and young people.  We have been working with
our partner agencies to more robustly apply the criteria for IRDs, for example, where
families are supported by a Social Worker, then we hold a relevant meeting which involves
the family and young person, rather than professionals only.  This is a likely explanation for a
reduction in IRD numbers from CP Quarter 1 to CP Quarter 4. 
Graph 2: IRDs and
number of children
subject to an IRD
Graph 2 shows the
quarterly trend in IRDs
(between 1 Aug 2023 and
31 July 2024).  In CP
Quarter 4, 84 children
were involved in 47 IRDs. 
Of the 84 children, 21
had been subject to two
or more IRDs in the past
(25%).   For each quarter,
the number of children is greater than the number of IRDs as each IRD can consider multiple
children within a family.
Most referrals for IRDs in CP Quarter 4 came from the Police (46.4% [39]), closely followed
by Social Work (39.3% [33]). 
The IRD process determines the most suitable pathway for the child to ensure their safety
and any support required.  An IRD can consider initiating a Child Protection Planning
Meeting, which deliberates the child’s name being placed on the North-East Child Protection
Register (NECPR/CPR/Register). 
66 65 63
47
125
105
89 84
0
20
40
60
80
100
120
140
Q1 Q2 Q3 Q4
IRDs
No. of IRDs since 1 Aug No. of children since 1 Aug
Page 22

Page 23

APPENDIX 1
3 | P a g e
Pie chart 2: Main reasons for IRD 
As per chart above, throughout CP Quarter 4, physical assault remains a consistent reason for an
IRD being held (26, 55%), followed by sexual assault (24, 51%) domestic abuse (11, 23%) and
other reason (this includes cumulative neglect) (12, 25%). 
We are interested to consider over a period whether there is any impact for the reasons an IRD is
convened in relation to the delivery of the following training, Safe and Together and Graded Care
Profile, which is still being delivered.                        
Pie chart 3: Child protection concerns 
During CP Quarter 4, Domestic Abuse, Child affected by parent/carer mental ill health and
Parental Drug Use remain the main child protection concerns.  *Note there may be more than
one concern documented for each child*
Joint consideration with adult mental health services is required to see if there can be any
further support and developments in this area for reporting next quarter.
Page 23

Page 24

APPENDIX 1
4 | P a g e
Following the IRDs, 31 Child Protection Investigations were carried out, 7 Initial Child Protection
Planning Meetings were convened, and 26 Joint Investigative Interviews were requested. From
31 Child Protection Investigations (31 children) this resulted in only 7 Initial Child Protection
Planning Meetings and the families that did not progress to this had actions closed following
support from social work, or social work requested a commissioned service.  We have been
working with the child protection lead in education to support more robust child planning
processes and understanding of significant harm, e.g. a Senior Social Worker will attend future
Education Child Protection Coordinator Network meetings. 
Graph 3: Joint Investigative Interviewing 
Graph 3 shows the trend across the year 2023/24 for joint investigative interviews and Scottish
Child Investigative Interviews. 
16
26
9
12 12
9
13
7 7
13
10
413 22 8 11 9 6 13 7 7 13 9 4
3 4
1 1
3
0 0 0 0 0 1 0
0
2
4
6
8
10
12
14
16
18
0
5
10
15
20
25
30
Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24
JII and Scottish Child Interview Model
No. of children subject to a JII as decision of IRD No. of JII - SCIM
No. of JII - 5 - day No. of children who declined/or did not complete JII
No. of SCIM JIIs undertaken
Page 24

Page 25

APPENDIX 1
5 | P a g e
Graph 4 – JII & SCIM 
Graph 4 shows the activity of Joint Investigative Interviewing across CP Quarter 4, during which
27 children were recommended for Joint Investigative Interview (JII); 22 interviews were
completed and five children either declined or a different form of interview was carried out. 
The Social Work Data Group, chaired by a Service Manager, will track physical assaults across CP
Quarter 4, from IRD to JII considering intervention and support, safety planning and outcomes for
the children and young people. 
Graph 5: Initial Child Protection Planning Meetings 
Graph 5 shows the trend across the last three reporting years (2021-2024) for the number of
Initial and Pre-birth Child Protection Planning Meetings, and the number of children.  The
number of children subject to CPPMs is higher than the number of meetings held, due to some
meetings considering sibling groups.
13
10
4
13
9
4
0 1 02 2 1
11
8
3
13
9
4
0
2
4
6
8
10
12
14
May-24 Jun-24 Jul-24
JIIs using SCIM
No. of children subject to a JII as decision of IRD No. of JII - SCIM
No. of JII - 5 - day No. of children who declined/or did not complete JII
No. of SCIM JIIs undertaken How many JIIs used SCIM
Page 25

Page 26

APPENDIX 1
6 | P a g e
The high numbers in CP Quarter 1 and CP Quarter 2 can be attributed to large numbers of
children within a small number of families.
At the end of CP Quarter 4, 7 Initial and Pre-birth Child Protection Planning Meetings were held
for 12 children of these, 9 children’s names were place on the register. 
Graph 6: Conversions from IRD to ICCPM
Graph 6 above shows the trend from 2020 through to 2024 and specifically CP Quarter 4, where
the conversion rate from ICPPM to Child Protection Registration was 75%.
13
20
28 30
8
18 16
25
8 10
22 18
25
39
19 14
75 78
100
76
100
77
94 91
75 73
45
78 78 83
94
75
0
20
40
60
80
100
120
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Aug-
Oct
Nov-
Jan
Feb-
Apr
May-
Jul
Aug-
Oct
Nov-
Jan
Feb-
Apr
May-
Jul
Aug-
Oct
Nov-
Jan
Feb-
Apr
May-
Jul
Aug-
Oct
Nov-
Jan
Feb-
Apr
May-
Jul
2020/21 2021/22 2022/23 2023/24
Conversion Rates
% IRD to Initial and Pre-Birth CPPMs % Initial and Pre-Birth CPPMs to Registration
The
conversion
rate from
referral to IRD
is 7.6%
The
conversion
rate from IRD
to CPI is 65%
Conversion
rate from
CPI to ICPPM
is 38.7%
Page 26

Page 27

APPENDIX 1
7 | P a g e
During CP Quarter 4, there were 20 Review Child Protection Planning Meetings (RCPPM)
held for 44 children, where their circumstances were reviewed with their families, lead
professionals and advocates, to assess if the identified risks had been sufficiently reduced to
consider removing the child’s name from the register.
Graph 7: Child Protection Registration Trends
The trend is depicted across Graph 7 from 2021-2024 and shows in CP Quarter 4, that 13
children were de-registered and 9 new children were registered.  This meant at the end of
CP Quarter 4, the number of children who were on the Child Protection Register (CPR) had
reduced by 4 (from 70 to 66). 
5
10
15
21
6 8 9
14
25
34
16
9
31 35
44
50
42
37
27
32
50
79
70 66
9 6 6
15 14 13
20
9 9 5
25
13
0
10
20
30
40
50
60
70
80
90
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Aug-Oct Nov-Jan Feb-Apr May-Jul Aug-Oct Nov-Jan Feb-Apr May-Jul Aug-Oct Nov-Jan Feb-Apr May-Jul
2021/22 2022/23 2023/24
Child Protection Register
Number of Registrations Number on Register Number of De-Registrations
Page 27

Page 28

APPENDIX 1
8 | P a g e
Pie chart 4: CP Quarter 4 registration reasons
Graph 8: Registration Categories 
Graph 8 above indicates the trend in registration categories across the reporting period
(from August 2023 to July 2024). There has been a significant reduction in new registrations
for the category Child affected by parental mental ill-health, with figures showing a
reduction from 8 new registrations in CP Quarter 3 (Feb 2024 – Apr 2024) to 0 in CP Quarter
4 (May 2024 – July 2024). 
New Reg Concern:
Domestic Abuse, 4,
23%
New Reg Parental
Alcohol Use, 3, 18%
New Reg Concern:
Parental Drug Use,
2, 12%
New Reg Concern:
Physical Abuse, 1,
6%
New Reg Concern:
Emotional Abuse, 4,
23%
New Reg Concern:
Other Concern, 3,
18%
CP Q4 REGISTRATION REASONS
3
1
8
6
8
1
7
11
4 43
5
3 33
16
1 23
1 1
5 5 4
1
8 9
2
4
2 3
0
2
4
6
8
10
12
14
16
18
Q1 Q2 Q3 Q4
Registration Categories
Services find it hard to engage Child Affected by Parent/Carer Mental Ill-Health
Child experiencing mental health problems Domestic Abuse
Parental Alcohol Use Parental Drug Use
Physical Abuse Emotional Abuse
Criminal Exploitation Neglect
Other Concern
Page 28

Page 29

APPENDIX 1
9 | P a g e
37% of IRDs was for the category sexual abuse which does not follow through to registration
reasons because the majority were not familial and were more due to experiences of sexual
abuse from a peer, where the family are supportive and assessed as able to protect the
young people.
45% of IRDs was for physical abuse which does not follow through to registration reasons as
most physical assaults were from parents struggling with their parenting role, and with
appropriate support to families, child protection plans were not necessary.
Graph 9: Family Groups
As shown in Graph 9, at the end of CP Quarter 4, there were 13 family groups consisting of
one child, 8 family groups with 2 children and 10 family groups of 3 or more children on the
register. 
Graph 10: Previous Registrations
25
8
0
5
10
15
20
25
30
Jul-24
Previous Registrations
No. of children with 1 previous registration No. of children with more than 2 previous registration
Page 29

Page 30

APPENDIX 1
10 | P a g e
At the end of the CP Quarter 4, there were 25 children on the register who had 1 previous
registration and 8 with 2 or more previous registrations.  No child or young person’s name
was placed back on the register within 24 months of de-registration (as indicated in Graph
10). 
Graph 11: Time on NECPR 
Graph 12: Age of children on the register
Graph 12 shows the trend for 2023/24 against CP Quarter 4 data where all age categories
have remained consistent with only a slight fluctuation throughout the Quarter. The number
of young people aged 16 years old has remained static since December 2023. 
42
15
10
1
0
34
21
5
6
0
22
32
6
5
1
<6 months
6 mths < 1 year
1 year < 18 mths
18 mths < 2 years
> 2 years
Time on the NECPR
Jul-24 Jun-24 May-24
Page 30

Page 31

APPENDIX 1
11 | P a g e
THE FOLLOWING SECTIONS REPORT AGAINST THE FINANCIAL QUARTER (JULY-SEPT 2024) 
Graph 13: Number of children looked after away from home and at home 
Graph 13 identifies that at the end of Financial (Fin) Quarter 2, there were 175 children who
were looked after by Moray. This figure has remained relatively stable throughout the
reporting period. 
Pie chart 5: Care setting categories
At the end of Fin Quarter 2, 47% of children were in family settings at home or in kinship
care with 53% in other settings such as foster care or residential homes. This is a positive
indication that many looked after children can remain within their network of family and
friends. Alongside this, 90% of siblings remain together in a care setting.  Siblings who are
not together are because of family circumstances or assessed needs.  There is planned work
via the Maintaining Relationships Project to sustain and increase the percentage of siblings
remaining together in care settings in line with the Children’s Service Plan.   
Foster care (54) and kinship care (44) are the highest categories followed by children looked
after at home (38).  Our residential houses (10) remain at approximately the same level as
the Out of Area residential category (11).  The carer recruitment campaign has seen new
176 178
185 187
183 180 182
172 172
177 179
175 173 175
160
165
170
175
180
185
190
Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24
No. of Looked After Children
Page 31

Page 32

APPENDIX 1
12 | P a g e
foster carers approved to support young people remaining in Moray in family care settings. 
A significant majority of young people are in family-based care rather than residential care.   
At the end of Fin Quarter 2, 12% of our looked after children were cared for on a full-time
basis in residential accommodation.  If short breaks are included the figure increases to
14.8%. The indicator (to be kept within or lower) is adjusted annually to the median of
comparator authorities (17.5% 2022/23).  As such, Moray is below the median indicator
when considering full-time care on its own and including short breaks.  This highlights in
Moray there is a priority to support young people in family-based care, where possible, to
provide a positive model of family life.
One young person was placed in secure care from November 2023 on remand at the
direction of the Court.  This aligns with the recent changes in Justice legislation for children
under 18 where they are remanded into the care of local authorities rather than Young
Offenders Institutions.
Moray hosts a group of 10 young people who are Unaccompanied Asylum-Seeking children
and young people via the National Transfer Scheme.  These children and young people are
allocated to the Throughcare and Aftercare Team by the Home Office and are counted as
looked after children to ensure they receive full support.  Initially, these young people are in
Supported Lodgings care settings or Supported Accommodation.  The team continues to
successfully support them to move into their own independent housing once they have been
granted asylum.  The approach adopted by Moray is seen by COSLA as a model of good
practice as it offers flexibility and has an ability to respond to the differing needs of young
people. 
Graph 14: Moray foster care households 
At end of Fin Quarter 2 there were 54 children living in foster care, with 48 (89%) children
living with foster carers employed by Moray Council and six (11%) living with independent
28
36 37 37 36 35
27 25 25
28
31
0
5
10
15
20
25
30
35
40
36 Q2 Q3 Q4 Q1 Q2
Q1
2023/24 2023/24 2023/24 2024/25 2024/25
Moray Foster Care
Number of Moray Council Fostering households
Number of Moray Council Foster Carers with “Active” placements at the end of the period
Page 32

Page 33

APPENDIX 1
13 | P a g e
foster carers.  Those young people living with independent foster carers are all in long-term
care with Permanence Orders. 
Not all fostering households have children living in their care.  At the end of Fin Quarter 2
this comprises four in total.  This is a small number due to family circumstances or matching
considerations of their registration approval where foster carers are inactive for a short
period of time. 
Graph 15: Children who live in foster care   
Graph 16 identifies the number of children cared for by Moray foster carers, 48 which is an
increase from Fin Quarter 2 in 2023 which was 43.  However, this includes some quarterly
fluctuations where the pattern is relatively stable.  The number of approved Moray foster
carer households available for children has seen a small decrease.  Although the carer
recruitment campaign is resulting in new fostering households, this is balanced by other
foster households ceasing or changing the type of fostering they provide. The challenge in
recruiting and retaining foster carers is both a local and national issue.  The carer
recruitment campaign is significant in recruiting foster carers where this is also accompanied
by work in relation to retention.  This is focused on the support provided to foster carers
including supervision, training and finances.   
Foster carers are graded by the level of skills learned and developed, ranging from Level 1 to
Level 4 being the highest. 
44 43 45 47 45 48 46 45 47 46 51 51 50 48
11 11 7 7 7 7 7 6 6 6
6 6 6 6
0
10
20
30
40
50
60
Children in Foster Care
Local Authority Foster Care Foster with other orgs paid for by Local Authority
Page 33

Page 34

APPENDIX 1
14 | P a g e
Graph 16: Kinship carers 
Kinship care is split into two groups: pre-approved kinship homes awaiting presentation at
the Kinship Panel for approval and kinship households already approved at Panel.         
Graph 17: Residential care 
Residential care is divided into those in residential care within Moray and those out with
Moray.  Children cared for within Moray live in the authority's own children’s houses, Cala
and Action for Children’s two houses in Buckie and Elgin.  The figure for this category is 10.
30
32
29
31 32
30 29 30 31
29 29 29 29 28
30 29
26 26
32
34
32 31 30
32 33 32 32 31
10
14 14
16
11
7
9 10
12
9
7 8 8 8
0
5
10
15
20
25
30
35
40
Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24
Kinship Care Settings
No. of households providing Kinship Placements No. of Children in Approved Placements
No. of Children in Pre-Approved Placements
13
14 14 14
13
12
13
12 12
13 13
12
11
10
11 11 11 11 11 11 11
10 10
11 11
9 9
11
0
2
4
6
8
10
12
14
16
Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24
Residential Care
Placement: Residential in Moray Placement: Out of Area
Page 34

Page 35

APPENDIX 1
15 | P a g e
Out of area care tends to be specialist residential houses or residential schools.  There has
been a consistent focus on providing this care in Moray where possible, so children remain
close to their families and support network.  The figure for this category is 11. 
There is work in place to reduce the number of young people in Out of Area care. These are
expensive care options but also do not support young people in maintaining their various
links in Moray including health, education, family and friends. 
Graph 18: Through care after care data
As illustrated in Graph 18, from 30 September 2024, there were 75 young people receiving
care from the Through Care After Care (TCAC) Team including nine receiving continuing care
support. 
The team is divided into three sections: 
• Through Care: Young people receiving support to plan and prepare for
independence.
• After Care: Young people who have left care but are receiving continuing support. 
• Continuing Care: Young people who choose to remain where they live beyond their
18th birthday until they are 21 although it can be in place from 16.  These young
people cease to be formally looked after by Moray but are legally entitled to
continue living where they are. This provides stability in a familiar and nurturing
setting. There is a focus on continuing care to ensure young people in different care
settings are all provided the opportunity to remain where they are living potentially
up until the age of 21.  This is a key responsibility for the organisation and partners as
corporate parents.   
The team is responsible for supported unaccompanied asylum-seeking children and young
people via the National Transfer Scheme.  This is an increasing workload for the team, which
is dependent, in part, on the numbers of young people arriving in Kent, making future
forecasting a significant challenge.       
35
33
28
8
9
9
37
40
38
0 5 10 15 20 25 30 35 40 45
Jul-24
Aug-24
Sep-24
Through Care, After Care and Continuing Care
Through Care Continuing Care Aftercare
Page 35

Page 36

APPENDIX 1
16 | P a g e
Justice and Youth Justice. 
Graph 19: Care experienced young people open to Justice Services
Nationally, care experienced young people (CEYP) are overrepresented in the Scottish Justice
Systems.  At the end of Fin Quarter 2, 7.2% (36 of 502) were CEYP (up to age 26) within the
Justice System (Youth Justice 12, Justice Social Work 24) depicted in graph 19, showing an
increase from 4.5% at end of Fin Quarter 1.  An error in reporting resulted in the figures for
the Youth Justice team not being included in this data and the Fin Quarter 1 figure should
have been 6.4%.  This figure has consistently remained below 12% throughout 2023/24. 
Work continues to identify and offer early intervention and support where possible to
identify CEYP and offer early help where possible to reduce the amount of time in which
they are involved with justice services. The aim is to reduce the risk of re-offending to
prevent CEYP requiring these services in the future. 
435 424 421 424 403 415 422 450 440 449 443 466 472
44 46 46 41
38 39 45
38 40 36 37
32 30
9.18 8.93 8.99
9.46 9.52 9.47
8.35
7.58
7.29
6.39
7.23
6.82
7.17
0
1
2
3
4
5
6
7
8
9
10
0
100
200
300
400
500
600
Sep-23 Oct-23 Nov-23 Dec-23 Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24
Care Experienced People in the Justice System
Open to Justice Team No. open to Youth Justice %  CEYP open to both MYJ and JS
Page 36

Page 37

APPENDIX 1
17 | P a g e
Graph 20: Ages of young people in Youth Justice
The average age of a young person receiving Youth Justice services is 15 years old which is
predominately males accounting for 93% of young people supported by the service. 
Pie chart 6: Gender of young people in Youth Justice 
Pie chart 7: Justice Report Types
At the end of Fin Quarter 2, 13% of individuals in Justice Social Work were women, which has
remained relatively static over the past year.  It is recognised women in the justice process
0 0 1 1 1 1 1 1 0 0 0 0 1 1
33 29 31 30
24 22 22
27
21 22 21 21 21 21
14
15
14 15
15
14 15
14
13
16
13 15 10 7
2
0 0 0
1
1 1
3
4
2
2 1
0
1
49
44 46 46
41
38 39
45
38 40
36 37
32 30
0
10
20
30
40
50
60
Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24
Youth Justice Age Bands
Age Band: 5-10 Age Band: 11-15 Age Band: 16-17 Age Band: 18+ No. open to Youth Justice
87%
13%
JSW Gender
Male Female
28
2
Youth Justice Gender
Male Female
Page 37

Page 38

APPENDIX 1
18 | P a g e
are more likely to have experienced trauma and are also more likely to be a sole carer for a
child or family member.  In line with The Promise, Justice Social Work is committed to
keeping women in their local communities where it is safe to do so and provide robust
alternatives to custodial sentences.  Currently the Justice team offers a gender responsive
service which includes a weekly women’s group and a woman only unpaid work
group.  Support is offered in partnership with other services to promote opportunities for
individuals to engage with community resources which will be available beyond their time
within the justice service.   
Graph 21: Justice social work reports (JSWR)  
Justice social work reports (JSWR) remain a priority to reduce any delays in sentencing and
for Fin Quarter 2 the target of 100% on time has been met.  Whilst reports are prepared at
the request of any Court for an individual living in Moray, most reports are submitted to
Elgin Sheriff Court.  There has been small reduction in sentencing reports completed in Fin
Quarter 2 due to a reduction in requests received from Courts.  The trend of small increases
or decreases is expected each month or quarter. 
Pie chart 8: Justice Report Types
Page 38

Page 39

APPENDIX 1
19 | P a g e
In addition to a standard JSWR report the Court may request additional assessments such as
a Drug Treatment and Testing Order (DTTO) assessment and a Restriction of Liberty Order
(ROLO) assessment as shown in pie chart 8.  The imposition of a ROLO or DTTO can be a
direct alternative to custody so effective assessments for these Orders can offer a robust
community-based disposal. 
Graph 22: Structured deferred sentences (SDS)
An
SDS is a flexible intervention providing structured social work support for an individual after
conviction but prior to sentencing.  Successful completion of an SDS reduces the need for a
statutory Court Order, in turn reducing the overall length of time an individual is open to the
service.  There has been a reduction in SDSs in Fin Quarter 2 which will have been impacted
slightly by the reduction in overall reports requested.  There was also a slight increase in
report requests for a ROLO which indicates a more serious offence or pattern of offending
for which a recommendation for an SDS would unlikely be suitable.
Graph 23: Bail supervision
3, 3%
39, 36%
62, 58%
3, 3%
Type of Report
JSWR DTTO Assessment
JSWR ROLO Assessment
JSWR Standard
JSWR  Unpaid
Work/DTTO/ROLO
Assessment
15
5
7
1
MALE Q1 FEMALE Q1 MALE Q2 FEMALE Q2
Structured Deferred Sentences
Number imposed
Page 39

Page 40

APPENDIX 1
20 | P a g e
Bail supervision is an alternative to remand and the priority for this in Moray is women,
young people, those with caring or parental responsibilities and those with issues relating to
mental health or addictions.  There is no significant change in either numbers of assessments
requested, or bail supervision orders imposed in Fin Quarter 2.  Less than 25% of
assessments result in bail supervision being imposed.  National data is not available to
compare, however, working groups have confirmed this variation is not isolated to Moray. 
Currently the prison population is significantly high, and bail supervision is one area of work
which is hoped will assist in reducing these numbers whilst offering more positive outcomes
for individuals within their local communities. 
Graph 24: CPO with supervision requirement 
Fin Quarter 2 has seen an increase in the imposition of Community Payback Orders (CPO),
despite a small reduction in reports being submitted.  Most individuals made subject to a
CPO are seen on the day of sentencing, for those where this has not been possible, an
appointment with their allocated worker is made within seven days of an Order being
imposed.  Missed targets this quarter all relate to individuals not attending appointments.
54
5
58
413 1 11 2
0
10
20
30
40
50
60
70
Male Q1 Female Q1 Male Q2 Female Q2
Bail Supervision
Bail Sup. Assessments Bail Sup imposed
Page 40

Page 41

APPENDIX 1
21 | P a g e
Diversion from Prosecution
Diversion from prosecution allows someone accused of offences to be dealt with outside of
the formal justice system.  The Justice Social Work team undertakes all assessments of
suitability; however, the Youth Justice team will complete any interventions or support for
young people aged 16 and 17.  The referral rate varies which is a result of the process of
cases being marked by the Procurator Fiscal.  There can occasionally be delays in the
commencement of these cases where additional agreement is required from the Procurator
Fiscal, e.g. an extended period for completion.
Successful completion of a diversion from prosecution means an individual will not have a
conviction for the alleged offence which may impact their current or future employment or
education alongside other significant areas of their life. 
Graph 25: Diversion from prosecution: Female
Page 41

Page 42

APPENDIX 1
22 | P a g e
Graph 26: Diversion from prosecution: Male       
Policy Team. 
Support and protection of children and young people procedure rollout
As noted in the previous report, the Policy Team within Children and Families and Justice
Social Work, in collaboration with partner agencies, lead on the revision of the Moray
Multiagency Child Protection Procedure now known as Support and Protection of Children
and Young People.  This procedure has been successfully rolled out via a comprehensive
implementation plan targeting several practitioners across the partnership, as illustrated on
the figure below. 
Page 42

Page 43

APPENDIX 1
23 | P a g e
The briefing paper outlined the
key changes to the procedure,
whilst the interactive briefing
sessions offered a walkthrough
of various processes through
Alfie’s story, a video series
(developed by the charity Not in
Our Community) exploring the
realities of criminal exploitation
from the perspective of a young
person.   
Commissioning. 
Pie chart 9: Contract categories 
Pie chart 9 identifies the
seven main category areas
of the contracts held
within the Children &
Families and Justice
commissioning team.
The family support
category covers a range of
services which deliver
prevention and early
intervention to avoid
family breakdown and
possible out of area care.
This category covers three
family support services
(Families Together, Functional Family Therapy and Youth Point Services) and the Independent
Advocacy contract.
For the services delivered to children with a disability, the short breaks service contract commenced
this quarter with the incumbent provider following a commissioning process including tender
advertisement, ensuring there was continuity and no gap in service provision.  
There is a new service for children with a disability – group activities, which was tendered, evaluated
and awarded to Action for Children, this contract was due to commence 1 November 2024.  
A local framework was developed to formalise the contractual agreements for 3 young people to reside
locally and be supported with their physical disabilities in a residential home.
There are currently 8 young people residing in residential care in Moray provided by Action for
Children.  This contract expires 31 March 2025 and during Fin Quarter 2 the commissioning team
gathered the views of the young people, developed and finalised the specification with the tender
being advertised as part of the commissioning process.
The three family support services report a combined total of 116 children, young people and their
families on their current workload, broken down in the illustration below:
Page 43

Page 44

APPENDIX 1
24 | P a g e
All three family support services have
capacity for referrals, which has been
communicated across social work
teams.
The three family supports services are
reporting and providing evidence on
achieving 21 contractual outcomes with a further 11 in progress:
Families Together have reported 88 children and young
people (from 57 families) being positively impacted
following families being supported with financial gains
and debt management as part of the Children First
service. 
The illustration above details service outcomes.
The independent relational advocacy service has been
contracted for a full year and the referral rate is
beginning to stabilise.  There are two lots for this contract, lot 1 for all the young people and lot 2 for
their parents, carers and siblings. They currently have 143 children, young people, parents or carers
and siblings on their caseload, including 36 looked after children and 39 subject of child protection.  In
Fin Quarter 2, independent advocates supported children and families in 46 meetings.
Graph 27: Meetings attended by independent advocacy service 
Pie chart 10: LAC and CP on current caseload
A direct award contract for self-regulation and behaviour management was finalised (previously this
was for foster care) which commences on 1 November 2024, will include adoptive, kinship and
supported lodgings care. 
For the first year, the Scottish Government expanded the Scottish Living Wage uplift to cover the
providers of children’s services which the commissioning team continues to implement.
The commissioning team attended 4 training sessions – modern slavery, trauma informed, and 2 x child
criminal exploitation.  These courses have helped to contribute to the language of the specifications
and contract monitoring going forward.
On 13 September 2024 there was a commissioning development day held with adult services
commissioning and service managers in relation to the contract monitoring process. 
LAC & CP on Current Caseload
LAC Under CP
Page 44

Page 45

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 18 FEBRUARY 2025  
SUBJECT:  EDUCATION REVENUE BUDGET MONITORING TO 31
DECEMBER 2024  
BY:   DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1  To inform the Committee of the revenue budget position for Education as at
31 December 2024.  
1.2  This report is submitted to Council in terms of Section III (A) 2 of the Council's
Scheme of Administration relating to the consideration of capital and revenue
budgets and long term financial plans. 
2. RECOMMENDATION 
2.1  It is recommended that Committee scrutinises and notes the budget
position at 31 December 2024.  
3. BACKGROUND 
3.1  The report highlights those areas of budget where there is variance identified
at 31 December 2024. 
4. BUDGET POSITION 
4.1 The spend at 31 December is £88,378,000 against a budget of £118,688,000
giving an underspend of £321,000, as shown in Appendix 1. 
4.2 The variance in Early Learning and Childcare (ELC) Education is a £45,000
overspend which relates to an underspend in snack and fundraising of
£37,000 will be transferred to ear marked reserves at the end of the financial
year, £8,000 of underspend in the training budget and £2,000 of small
underspends and an overspend of £92,000 to partner providers. 
Item 6.*
Page 45

Page 46

4.3 In Primary Devolved School Management (DSM) scheme there is an
underspend of £331,000 across all schools. This relates to an underspend of
£245,000 across all primary schools and an underspend of £66,000 on non-
devolved costs ie oncosts £51,000 underspend, energy underspend of
£17,000, grounds maintenance overspend of £3,000 and rent and rates
underspend of £1,000. The oncosts underspend is due to a staffing
underspend on the devolved budget.  This will continue to be monitored
across the year where there has been no increase in these budget lines for a
number of years. 
4.4 The Secondary DSM scheme has an underspend of £510,000 which relates
to an underspend of £452,000 across all secondary schools and a £58,000
underspend in the non-devolved budget made up of a £9,000 underspend in
energy, £46,000 underspend in oncosts and £3,000 underspend in rent and
rates.  The oncosts underspend is due to staffing underspend in the devolved
budget.  As with Primary DSM there has been no increase in the non-
devolved budget line for a number of years. However budgets are changed for
increases in pension and National Insurance (NI) contributions and changes
in energy prices.  Underspend in Secondary is exacerbated due to the
difficulty in filling subject specific posts. 
4.5 Within additional support needs there is an overspend of £21,000 which is
due to overspend of £56,000 on redundancy payments following a recent
change management plan, where there was no suitable alternative post
identified, which will be funded from reserves.  The posts were not deleted
however staff did not wish to be matched to new positions which will better
meet the needs of the service.  There is also an overspend of £21,000 on
legal fees linked to ASN Tribunal, underspend of £26,000 on the Speech and
Language contract due to delay in filling a post.  There are small underspends
in the training budget of £6,000, and general underspends of £12,000.   
4.6 In the Education Central Services budget there is an overspend of £219,000
which relates to underspends of £23,000 for school sanitary products a slight
increase from other reporting periods,  £5,000 for disturbance allowance,
£9,000 for teacher post advertising and £13,000 of other minor
over/underspends.  There is an overspend of £269,000 in the central supply
budget relating to cover for long term absence and maternity leave payments. 
This is projected, on current rates, to be an overspend of £600,000 by year
end.  A process has been put in place in order to ascertain whether the
overspend is due to maternity cover or sickness which is informing the service
in order that schools with high level of sickness can be targeted for support.
Half of the supply budget supports maternity absence which has increased
over the last few years.  There is no contingency for this apart from
considering increasing the budget taking trend data into account.   
4.7 The Out of Area (OOA) budget is overspent by £220,000 and is predicted to
be £430,000 of an overspend at year end.  This has been identified as a
budget pressure and is being closely monitored by the Interim Chief Social
Worker and Chief Education Officer.  This can be further impacted on where
Page 46

Page 47

care packages have to be adapted or where court or Children’s Reporter
processes impact on decisions regarding young people. 
5. EDUCATION SAVINGS 2024-25 
Details Approved
Saving
£000
Achieved 
Saving
£000
Reason for 
non achievement
Primary Advisor role 15 15 
ELC – delete PSA post 12 12 
ELC – reduce teaching
team by 2 posts  83  83 
Primary – teacher pupil
ratio move to statutory
position – change in
linear formula  42  41 
Secondary – reduce
DSM  188  192 
Central Education –
remove 1 QIM  109  85
Saving started August
2024. Balance made in
25/26
Central Education –
remove 1 Learning
Technologist  50  43
Saving started August
2024. Balance made in
25/26
Total 499 471 
6. OUTTURN 
6.1 The predicted outturn for year end based on current spend is £113,000 of an
underspend mainly related to the underspends in DSM offset by predicted
overspends in ELC, the central education budget and the out of area budget.  
7. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement 
Plan (LOIP)) 
The Education Revenue Budget has particular reference to National
Outcome 8 – we have improved the life chances for children, young
people and families at risk.  
(b) Policy and Legal 
The Council has statutory responsibilities to meet educational needs, the
needs of children and young people in need and those it looks after.  
(c) Financial implications 
The resource implications are set out in this report and at Appendix 1.
The underspend as at 31 December 2024 is £321,000 against a budget
to date of £88,378,000. The estimated year end position is expenditure
Page 47

Page 48

of £118,575,000 against a budget of £118,688,000 resulting in an
underspend of £113,000. 
(d) Risk Implications 
Budget managers are aware of their responsibilities for managing budget
allocations and approval for any variances will be sought from
Committee in line with Financial Regulations.  The central supply budget
is a key risk for the service in terms of posts having to be covered during
absence.  Trends in increased maternity leave and long term absence
are noted and put further pressure on this budget.  
(e) Staffing Implications 
There are no staffing implications associated with this report.  
(f) Property 
There are no property issues arising from this report. 
(g) Equalities/Socio Economic Impact 
This is not needed because the report is to inform the Committee on
budget monitoring.  
(h) Climate Change and Biodiversity Impacts 
None. 
(i) Consultations 
Chief Financial Officer, Nicky Gosling, Accountant and Caroline
O’Connor, Committee Services Officer have been consulted and are in
agreement with the contents of this report where it relates to their areas
of responsibility.  
8. CONCLUSION 
8.1  The Committee considers and notes the budget position as at 31
December 2024.    
Author of Report:  Vivienne Cross, Head of Education 
Background Papers:    
Ref:     SPMAN-1315769894-617   
Page 48

Page 49

Educational Services APPENDIX 1
Budget Monitoring Report to 31 December 2024
Service
Revised
Budget 
Budget to
Date 
Actual to
Date 
Variance to
Date  Variance
Full Year
Forecast
Full Year
Variance
£'000  £'000  £'000  £'000 % £'000  £'000
Early Learning and Childcare 15,406 10,699 10,744 (45) - 15,513 (107)
Primary Education 35,003 26,157 25,846 311 1 % 34,941 62
Secondary Education 39,593 29,744 29,234 510 2 % 39,535 58
Additional Support Needs 19,793 14,589 14,610 (21) - 19,789 4
Education Central Services 5,246 4,684 4,903 (219) (5)% 5,777 (531)
Management 140 105 100 5 5 % 134 6
Out of Area 3,279 2,400 2,620 (220) (9)% 3,709 (430)
Efficiency Savings-Education 228 - - - - (767) 995
-
Educational Services Total 118,688 88,378 88,057 321 - 118,631 57
Item 6.*
Page 49

Page 50

Page 50

Page 51

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 18 FEBRUARY 2025 
SUBJECT: EARLY LEARNING AND CHILDCARE – PRIMARY 1
ADMISSIONS 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the admissions policy surrounding early entry,
deferral and exceptional deferral for Early Learning and Childcare (ELC)
children transitioning to Primary 1 (P1). 
1.2 This report is submitted to Committee in terms of Section III (D) (1) of the
Council's Scheme of Administration relating to all the functions of the Council
as Education Authority. 
2. RECOMMENDATION 
2.1 It is recommended that Committee:- 
(i) scrutinise and note the contents of this report; and 
(ii) agrees the guidance contained in Appendices 1 and 2 as the
admissions policy surrounding early entry, deferral and
exceptional deferral. 
3. BACKGROUND 
3.1 When an ELC child is transitioning from ELC to Primary the standard process
is for parents/carers to register online, in the January prior to their child
starting in their chosen school e.g. for starting school in August 2025 the
parent/carer would register the child in January 2025. 
3.2 Children normally start school in the August following their 5th birthday.
Children who are aged 4 at the school commencement date in August and
who will have attained the statutory school age on or before 29 February may
start at age 4. 
Item 7.*
Page 51

Page 52

3.3 As well as the standard process for registration there are also three further
options for children transitioning from ELC to P1. These are Early Entry,
Deferral and Exceptional Deferral. 
Early Entry
3.4 Early entry is when a family request that a child starts Primary school before
the predetermined date. Generally the decision is made after discussion with
the ELC setting and may be linked to the families’ plans to move out of area to
a different school system. 
3.5 The formal process determines that parents should apply, in writing for Early
Entry, and then a member of the ELC central team makes initial contact.
Parents are then provided with a time and date for a telephone interview to
support the Early Entry application. 
3.6 At the end of term 3, the ELC setting is asked to complete a standard Early
Entry questionnaire and an observation is completed by 2 staff from the ELC
central team. An assessment is then undertaken with the child, administered
by the ELC central team using a number of criteria, to assess readiness to
start school early. This takes place in the zoned school with the parent and
Head teacher present. 
3.7 Finally the gathered information, from the observation, assessment and noting
criteria, is considered and parents are informed of the outcome by letter.
Parents are made aware at every stage of the process that there is no right of
appeal and that the child’s needs are always at the heart of the decision
made. Further details can be found in Appendix 1. 
Deferral
3.8 Deferred entry to school means that children start Primary School one year
later than the typical start date, e.g. after the start of the new school term –
18th August 2025 for the next academic year 
3.9 All parents and carers have the legal right to defer their child’s entry to
Primary School if they are not yet 5 years old at the beginning of the school
year. 
3.10 All children who defer will automatically be entitled to an additional year of
funded ELC when they defer P1 entry. 
Exceptional Deferral
3.11 Exceptional deferral means that the Team Around the Child (TAC), including
parents, recommend that a child does not start school as soon as they are
eligible. 
3.12 If the TAC is requesting an exceptional deferral this means the child has no
right to automatic entitlement and no central government funding is made
available to support an additional ELC year for these children. Therefore the
cost of any such request is an additional cost for the ELC service and Council. 
Page 52

Page 53

3.13 There are some exceptional circumstances where deferred entry could be
considered as an intervention e.g. where a child has had a serious illness and
missed a significant period of time in ELC due to being in hospital. 
3.14 The right to exceptional deferral is not a legislative requirement and instead
the decision is made by the Head of Education once the recommendation
from the TAC is considered. The basis of the decision to request an
exceptional deferral needs to be evidenced through the Child Planning
process. The expected impact of the request needs to be evidenced and there
is no right to appeal 
3.15 For children with significant additional support needs, deferred entry may be
considered as an intervention if it is agreed by the child’s parents/carers and
the team around the child that this would be in their best interests. However, it
should be noted that in most situations the child will continue to have
significant needs, even with an additional ELC year, and so it is better to
assess the needs of the child and agree an appropriate support package for
school rather than deferring school entry. Further details can be found in
Appendix 2. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
This report relates to the ‘Tackle Poverty and Inequality’ priority as
referred to in the Moray Council Corporate Plan and to ‘Building a better
future for our children and young people in Moray’ from the LOIP. 
(b) Policy and Legal
None arising directly from the report. 
(c) Financial implications
Historically the cost of standard deferral has always been covered by
Moray Council. As we continue to see a rise in standard deferrals there
is an expected increase in the cost. Any exceptional deferrals also incur
an additional funding cost. Early entry does not have any financial
implications. 
(d) Risk Implications
None arising directly from the report. 
(e) Staffing Implications
None arising directly from the report. 
(f) Property
None arising directly from the report. 
(g) Equalities/Socio Economic Impact
ASN and Health needs have been considered however there is no
change so no IIA is required. 
(h) Climate Change and Biodiversity Impacts
Page 53

Page 54

None arising directly from the report. 
(i) Consultations
Head of Education (Chief Education Officer), Continuous Improvement
Officer (West), Continuous Improvement Officer (East), Principal
Teacher Early Years Education Service and Caroline O’Connor,
Committee Services Officer have been consulted and are in agreement
with the contents of this report as regards their respective
responsibilities. 
5. CONCLUSION 
5.1 That Committee is invited to scrutinise and note the contents of this
report for ELC admissions. 
Author of Report:  Hazel Sly, Early Years’ Service Manager 
Background Papers: 
Ref:  SPMAN-1315769894-607  
Page 54

Page 55

APPENDIX 1 
ELC exceptional deferral   1 
Moray Education
ELC | Early Entry
__________________________________________________________________________________
Parents who decide to request Early Entry for their child do so by discussion with their ELC and
accessing the Moray Council Website which gives them initial points to consider. 
If the parents decide to move forward with Early Entry the following steps are initiated; 
- An email request from the parent is sent to Education and Social care who pass the request to
the Early Learning and Childcare (ELC) Central team. 
- The Early Years Service Manager, on receipt of the email, contacts the parent and has an initial
discussion, detailing the process, collecting initial information and then giving them time to
consider if they still wish to continue.
- Parents are advised to indicate in writing that they wish to formally start the process and they
are then given a date when the parent telephone interview will take place. This considers the
best time to reach them and will take into account the country they are resident in at time of
application.
- At the end of term 3 requests are made to the child’s current Early Learning and Childcare
(ELC) provision for the setting to complete the ELC questionnaire.
- 2 staff from the ELC Central team will observe the child in the nursery and confirm any further
information that has been of concern from the parent interview and ELC submission.
- At the start of term 4 the same ELC Central staff complete the face-to-face assessment with
the child. The parent and the Head Teacher of the zoned school are also present. 
- Using the results of all 3 assessments a final decision is made which focusses on the best
outcome for the child. 
- The parents are contacted by the Early Years Service Manager to give them feedback on the
decision, and they will also then receive a formal notification letter. 
- Parents are made aware at every stage of the process that there is no right of appeal and that
the child’s needs are always at the heart of the decision made. 
Item 7.*
Page 55

Page 56

Page 56

Page 57

APPENDIX 2 
ELC exceptional deferral   1 
Moray Education
ELC | Deferral & Exceptional Deferral
__________________________________________________________________________________
Definition of deferral 
Deferred entry to school means that children start primary school one year later than the typical start
date.
All parents and carers have the legal right to defer their child’s entry to primary school if they are not
yet 5 years old at the beginning of the school year. 
All children who defer will automatically be entitled to an additional year of funded early learning and
childcare (ELC) when they defer P1 entry. 
Definition of exceptional deferral 
In Moray an exceptional deferral means that the Team Around the Child (TAC), including parents, do
not wish to send a child to school as soon as they are eligible. 
How are these different?
Nationally, the Team Around the Child does not require to be involved in a standard deferral. As per
the legislation this is a parent and carers legal right to defer their child’s entry to primary school if they
are not yet 5 at the beginning of the school year.
The right to exceptional deferral is not a legislative requirement and instead comes from the views of
the Team Around the Child (TAC - which can include Health, Education, Social Work and other related
professionals). The basis of the decision to request an exceptional deferral needs to be evidenced
through the Child Planning process. The expected impact of the request needs to be evidenced.
For children with significant additional support needs, deferred entry may be considered as an
intervention if it is agreed by the child’s parents/carers and the team around the child that this would
be in their best interests. However, it should be noted that in most situations the child will continue to
have significant needs, even with an additional ELC year, and so it is better to assess the needs of the
child and agree an appropriate support package for school rather than deferring school entry. 
Reasons for Deferral 
Item 7.*
Page 57

Page 58

APPENDIX 2 
ELC exceptional deferral   2 
Standard deferral
Requests relating to August – December birth dates
If parents/carers have any concerns or wish to discuss their child’s entry to school, staff will be happy
to help parents/carers better understand their child’s progress and needs while supporting them in
considering the issues pertinent to their child. 
Parents may be concerned that their child is not socially or academically able to cope with the demands
of school and formal education and it may be helpful for them to visit the P1 class and/or to discuss
aspects of the early level curriculum with the Head Teacher. 
Requests relating to January - February birth dates 
Parents of children with birthdays close to the end of the February cut-off date for school entry, are
sometimes concerned about whether their child is ready to start school. 
If their child’s birthday falls within January or February and they wish to defer entry to primary school,
their child is entitled to an additional year of provision within an ELC setting. Continued funding is
available to support this entitlement. 
In all instances parents and carers should be encouraged to discuss deferral first with the Manager of
the early learning and childcare (ELC) setting the child attends, which may also include a child minder.
While ELC staff in Moray can’t influence the decision they are always happy to support parents with a
discussion. 
Exceptional deferral
Requests relating to August (when your child is already 5) 
If your child is already five at the start of the school term the situation is more complex should a
parent/carer wish to request to defer entry to school. These children have no automatic entitlement
and no central government funding is made available to support an additional ELC year for these
children. 
There may be some exceptional situations in which deferred entry could be considered an
intervention. 
For example: 
• the child may have temporary additional support needs affecting their development, 
• the child has only recently arrived into the UK and has not experienced ELC at the same level as their
peers and needs time to adjust to nursery/school life, 
• the child may have missed a lot of ELC through illness, 
• the child has a summer birthday and was born very prematurely. 
Page 58

Page 59

APPENDIX 2 
ELC exceptional deferral   3 
Additional support needs discussions could include: 
• the opinion of the child, parents, school and other staff involved about whether it is right for the
child and their family 
• making sure parents understand any likely future issues 
• checking that the child will integrate effectively into the new group 
• making sure that any other services the child needs are also involved 
• making sure there is a plan for what happens after that year 
• checking that the decision is being made for the child’s benefit and with cognisance of their right to
be educated with their peers. 
In all cases of exceptional deferral there needs to be clear evidence of the discussion, through Child
planning, of the decision of the Team Around the Child (TAC). Clear action planning should be the
foundation of the exceptional deferral request to ensure robust interventions are agreed to support
the additional year in ELC. 
Process of deferral 
Firstly, we recommend considering the following when choosing to defer entry:
• You must discuss your request with your child’s early learning and childcare provider as well
as the primary school they would be attending.
• The final decision will be a shared one between you and the Education team.
If you have not decided whether to defer entry of your child, please continue with the enrolment
process so that your child does not miss out on a place.
If you have decided to defer entry of your child you must complete both the ELC registration form and
continue with the enrolment process and indicate deferred entry as your choice, the enrolment
registration will be much shorter as a result and should take no more than a few minutes.
For more information, please contact the Education team; education@moray.gov.uk 
Process of exceptional deferral 
In Moray the exception deferral process needs to come from the TAC.
TAC discussions might include the child’s;
• approach and attitude to learning 
• ability to communicate their own needs, feelings and ideas 
• levels of independence and self help 
Page 59

Page 60

APPENDIX 2 
ELC exceptional deferral   4 
• emotional and personal development, including self-confidence and esteem 
• their relationships and friendships with other children and adults 
In terms of exceptional deferral circumstances, it may be helpful to consider the general development
of the child using a very broad range of criteria. Assessment at this stage should be completed by ELC
staff, who are asked to ensure the child’s assessment record is backed by evidence that shows the areas
of development. This assessment process may include information and assessments completed by
other professionals working with the child, to provide a wider context upon which the final decision
can be made. 
Developmental overviews are used in all settings by Early Intervention Teachers and ELC staff and are
also key to reaching the correct decision. If parents/ carers are concerned about whether or not their
child is ready for school, they should speak directly to the staff who care for their child and/or to the
Manager of the ELC setting their child attends. This initial discussion can take place at any stage in the
child’s pre-school year. 
An example timeline of the exceptional deferral process for the team supporting the application would
be;
Dec/Jan EI Team and Early Years’ Service Manager to meet for initial discussion
around preschool placements. Any Exceptional deferral request should
have been voiced by the Child Planning Team around the Child in run up
to registration for school. School and ELC should be involved at this stage. 
QIO ASN updated regarding ‘potential’ requests.
Feb   Lead person for Exceptional Deferral to meet with EI Teacher to outline
plans and arrange dates for process to take place.
Head of Education made aware at this stage. 
Information Capture sheet completed by Team around the child.
Relevant schools and ELC settings informed of request. 
Request for information from ELC settings of child and Child Planning
minutes sent by Lead for Exceptional Deferral
28th Feb Deadline for requests to be made for Exceptional Deferral to Primary
School.  
Wk  beg 1st March Visits by Early Years Team to observe children in ELC Setting. 
Assessment sheet completed by Early Years Team.
End of March Lead person for Exceptional Deferral, Early Years’ Service Manager and
QIO ASN to meet for final consideration of requests. Request submitted
to Head of Education for final decision.
April Final decisions made then parents, ELC settings, schools and Business
Support Officer informed of outcomes. 
The recommendation is to apply for both school and ELC in case deferral is not accepted. 
Page 60

Page 61

APPENDIX 2 
ELC exceptional deferral   5 
All information gathered will be passed to the Head of Education, who will consider the request and
the evidence available and provide a formal written response to the parent/carer. Where it is agreed
that a child will significantly benefit if their entry to school is deferred, a continued ELC place may be
agreed by the Head of Education. The cost of this place will be met by the Council. 
Even if a parent/carer has been offered a deferred entry place they can change their mind and decide
to send their child to school right up until the start of term in August. 
If the Head of Education does not agree that the child should have a funded additional ELC place, the
decision is final and there is no right to appeal. The ultimate goal for all involved is to ensure the best
interests of the child are kept at the forefront of the decision making.
Page 61

Page 62

Page 62

Page 63

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 18 FEBRUARY 2025 
SUBJECT: EDUCATION SCOTLAND INSPECTION OF ST GERARDINE
NURSERY, LOSSIEMOUTH 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the outcomes of the recently published report on a
Moray Early Learning and Childcare (ELC) setting following inspection by
Education Scotland. 
1.2 This report is submitted to Committee in terms of Section III (D) (1) of the
Council's Scheme of Administration relating to all the functions of the Council
as Education Authority. 
2. RECOMMENDATION 
2.1 It is recommended that Committee scrutinise and notes the contents of
this report and findings of Education Scotland following their inspection. 
3. BACKGROUND 
3.1 When an ELC setting is inspected by Education Scotland a report is published
(by Education Scotland) which gives commentary on the setting’s
performance. These reports are presented regularly to this Committee, where
possible at the first available opportunity after publication. 
3.2 In October 2024, Education Scotland inspected St Gerardine, Lossiemouth
using the Short Inspection Model. 
3.3 The key features of the short inspection visit model were; 
- The team comprised of two inspectors.
- The inspectors spent 2½ days at the setting, including time for initial
scoping and feedback.
- The team inspecting Nursery liaised with the team inspecting School. 
Item 8.*
Page 63

Page 64

3.4 The Education Scotland Inspection team use selected Quality Indicators (QI’s)
from the How Good is our Early Learning and Childcare (HGIOELC) quality
framework which were evaluated using the six point scale, namely; 
QI 2.3 – Learning, Teaching and Assessment  
QI 3.2 - Securing Children’s Progress 
3.5 The inspectors also had a focus on safeguarding as is the case in every
inspection. 
3.6 The inspection findings indicated that St Gerardine Nursery has the capacity
to continue to improve and Education Scotland will make no more visits in
connection with this inspection. 
3.7 The summary of the inspection report is contained in Appendix 1. The
original inspection report and summary of inspection findings can be viewed
at; St Gerardine Primary School | Inspection Report | Education Scotland 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
This report relates to the ‘Tackle Poverty and Inequality’ priority as
referred to in the Moray Council Corporate Plan and to ‘Building a better
future for our children and young people in Moray’ from the LOIP. 
(b) Policy and Legal
This report relates to Section 66 of the Education (Scotland) Act 1980,
which concerns the inspection of educational establishments. 
(c) Financial implications
None arising directly from the report. 
(d) Risk Implications
None arising directly from the report. 
(e) Staffing Implications
None arising directly from the report. 
(f) Property
None arising directly from the report. 
(g) Equalities/Socio Economic Impact
An Equality Impact Assessment is not required as this report is to inform
Committee on performance following external scrutiny/validation activity. 
(h) Climate Change and Biodiversity Impacts
None arising directly from the report. 
(i) Consultations
Head of Education (Chief Education Officer), Continuous Improvement
Officer (West), Continuous Improvement Officer (East), Principal
Page 64

Page 65

Teacher Early Years Education Service and Caroline O’Connor,
Committee Services Officer have been consulted and are in agreement
with the contents of this report as regards their respective
responsibilities. 
5. CONCLUSION 
5.1 That Committee is invited to scrutinise and note the contents of this
report at St Gerardine Nursery, Lossiemouth. 
Author of Report:  Hazel Sly, Early Years’ Service Manager 
Background Papers: 
Ref: SPMAN-1315769894-603   
Page 65

Page 66

Page 66

Page 67

1   |   St Gerardine Primary School Nursery, Moray Council, 5202221 © Crown Copyright
17 December 2024
Dear Parent/Carer
In October 2024, a team of inspectors from Education Scotland visited St Gerardine Primary
School Nursery. During our visit, we talked to parents/carers and worked closely with the
manager and staff. 
The inspection team found the following strengths in the setting’s work.
• Happy, confident and independent learners. Nurturing, respectful relationships between
children, practitioners and families support children to feel secure and settle quickly.
Children benefit from a wide variety of learning experiences in their playroom and local
community.
• Practitioners who work well with parents. The team understand and value children’s
individual achievements and interests. They use this information effectively to respond
promptly to what children would like to participate in or learn more about. This supports
children to be motivated and make good progress in their learning and development.
The following areas for improvement were identified and discussed with the manager and a
representative from Moray Council.
• Approaches to observation and assessment of children’s learning need to be improved. The
team should develop further how they use their observations of children’s learning to inform
their planning of spaces and experiences. Practitioners need to identify more opportunities
for children to apply and develop further their skills.
• New approaches to record and track children’s learning over time should now be
implemented. As planned the manager should work with practitioners to better evidence the
progress children make over their time spent in nursery.
APPENDIX 1
Item 8.*
Page 67

Page 68

2   |   St Gerardine Primary School Nursery, Moray Council, 5202221 © Crown Copyright
We gathered evidence to enable us to evaluate the setting’s work using quality indicators from
How good is our early learning and childcare?. Quality indicators help learning and childcare
settings, local authorities and inspectors to judge what is working well and what needs to be
improved.
Here are Education Scotland’s evaluations for St Gerardine Primary
School Nursery 
Quality indicators for the nursery class Evaluation
Learning, teaching and assessment good
Securing children’s progress good
Descriptions of the evaluations are available from:
How good is our early learning and childcare? Appendix 1: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on the
Education Scotland website at: 
St Gerardine Primary School | Inspection Report | Education Scotland 
What happens next? 
We are confident that the setting has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. Moray Council will inform parents/carers about
the school’s progress as part of its arrangements for reporting on the quality of its settings. 
Margaret Paterson
HM Inspector
Page 68

Page 69

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 18 FEBRUARY 2025 
SUBJECT: EDUCATION SCOTLAND INSPECTION OF FINDOCHTY
PRIMARY SCHOOL 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the outcomes of the recently published report on a
Moray school following inspection by Education Scotland’s His Majesty’s
Inspectors of Education (HMIE). 
1.2 This report is submitted to Committee in terms of Section III (D) (1) of the 
Council's Scheme of Administration relating to all the functions of the Council 
as an Education Authority. 
2. RECOMMENDATION 
2.1 It is recommended that Committee scrutinise and note the contents of
this report and findings of Education Scotland HMIE following their
inspection visit. 
3. BACKGROUND 
3.1 When a school is inspected by Education Scotland HMIE and/or the Care
Inspectorate, a report is published which gives commentary on the school’s
performance.  These reports are presented regularly to Committee, where
possible at the first available opportunity after publication. 
3.2 In September 2024, a team of inspectors from Education Scotland HMIE
visited Findochty Primary School.  During their visit, inspectors talked to
parents/carers and children and worked closely with the Headteacher and
staff.   
3.3 Findochty Primary School was subject to a full inspection model visit spanning
over five days in total. 
Item 9.*
Page 69

Page 70

3.4  The Education Scotland Inspection team use selected Quality Indicators (QIs) 
from “How good is our school? 4th edition” (HGIOS4), rated using the six-
point scale.   
3.5  Education Scotland HMIE focus QIs for the Primary school (full inspection 
model) are: 
QI 1.3 Leadership of change 
QI 2.3 Learning, teaching and assessment 
QI 3.1 Ensuring wellbeing, equality and inclusion 
QI 3.2 Raising attainment and achievement 
3.6  Full establishment inspections also include focus on Safeguarding and
themes from other QIs to ensure Inspectors continue to capture the evidence
needed to promote improvement and provide evidence to inform national
policy development. These are not assigned a rating and are: 
QI 2.2 Curriculum  (Learning Pathways theme) 
QI 2.7 Partnerships  (Partnerships in evaluating the impact of parental 
engagement) 
3.7  Following further dialogue between Education Scotland HMIE and the local 
authority, Education Scotland published Findochty Primary School’s 
Inspection Report on 19 November 2024 with the following gradings: 
QI 1.3 Leadership of change Satisfactory
QI 2.3 Learning, teaching and assessment Satisfactory
QI 3.1 Ensuring wellbeing, equality and inclusion Good
QI 3.2 Raising attainment and achievement Satisfactory 
3.8  The inspection team found the following strengths in the school’s work: 
• The warm, welcoming and nurturing ethos children learn in. Staff
demonstrate care and support for all children and ensure everyone is fully
included in the life of the school. As a result, children feel safe and secure
with a strong sense of belonging. They behave well and engage positively
in their learning.
• The enthusiastic and hardworking staff team. They work well together to
support children to talk about and understand their emotions. As a result,
they support children’s wellbeing outcomes effectively.
• Staff’s approaches to improving children’s enthusiasm for reading. All staff
have supported children in a variety of ways to develop a love of reading.
This is improving children’s attainment in reading. 
3.9  The inspection team agreed the following areas for improvement with the 
Head Teacher and Moray Education: 
• With support from the local authority, improve approaches to gathering
accurate information that identifies clearly progress and next steps in
Page 70

Page 71

whole school improvement. In addition, staff should ensure they identify
an achievable number of school improvement priorities.
• Improve approaches to learning, teaching and assessment to ensure a
consistently high quality of experience for all children across the school. In
particular, staff need to plan learning that is appropriately progressive
across all areas of the curriculum and meets the needs of all children. 
• Develop further the school’s new processes to track more effectively the
progress of children across all areas of the curriculum. 
3.10 The Education Scotland HMIE inspection report and summary of inspection 
findings for the school can be viewed at (lower set of documents on web 
page directed to on each link below): 
• Inspection Report
• Summarised Inspection Findings
• Additional Inspection Evidence 
3.11 Following inspection, Education Scotland HMIE have advised that they are 
confident that the school has the capacity to continue to improve and will 
make no more visits in connection with the inspection.   
3.12 As a local authority we will continue to inform key stakeholders including 
parents/carers on the school’s progress  through normal arrangements on 
reporting on quality of schools. 
3.13 In further recognition of this positive inspection outcome, a Press Release 
was published on 19 November 2024 (day of Education Scotland HMIE report 
publication) to recognise the strengths recognised by the inspection team as 
well as actions underway to address areas for improvement identified. 
3.14 For reference, the Education Scotland HMIE visit report published in 
November 2024 following visit in September 2024 is contained within 
Appendix 1.   
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP))
Reflective of priorities within the Corporate Plan with particular regard to
(People) in providing a sustainable education service aiming for
excellence, progress in achieving better performance and improved
inspection outcomes, empowering and raising aspirations.  With regards
to the 10 Year Plan (Local Outcomes Improvement Plan LOIP), (2)
building a better future for our children and young people in Moray
through equity of learning experience offered across our schools;
supporting ambitious and confident children, able to reach their full
potential. 
(b) Policy and Legal
Page 71

Page 72

It is the duty of the local authority to secure improvement and the quality
of school education which is provided in schools managed by Head
Teachers and to raise standards of education (Section 3, 8 of Standards
in Scotland Schools Act etc 2000).   
This report relates to Section 66 of the Education (Scotland) Act 1980,
which concerns the inspection of educational establishments. 
(c) Financial implications
There are no financial implications arising directly from this report. 
(d) Risk Implications
There are no risk implications arising directly from this report.   
(e) Staffing Implications
There are no staffing implications arising directly from this report. 
(f) Property
None. 
(g) Equalities/Socio Economic Impact
An Equality/Socio Economic Impact Assessment is not required as this
report is to inform Committee on school performance following external
scrutiny/validation activity. 
(h) Climate Change and Biodiversity Impacts
No climate change or biodiversity implications have been determined due
to the scrutiny based nature of activities reported and no findings related
to such implications contained herein.     
(i) Consultations
Senior Officers in Education, Communities and Organisational
Development, Equal Opportunities Officer, Human Resources Manager,
Caroline O’Connor, Committee Services and the Headteacher of
Findochty Primary School have been consulted and are in agreement with
the contents of this report as regards their respective responsibilities. 
5. CONCLUSION 
5.1  Committee is invited to scrutinise and note the contents of this report, 
following positive full inspection model visit by Education Scotland 
HMIE as outlined above, to Findochty Primary School.   
Author of Report:  Stewart McLauchlan, Quality Improvement Manager 
Background Papers: Inspection Report    
Summarised Inspection Findings 
Additional Inspection Evidence 
Press Release 
How good is our school? 4th edition
Page 72

Page 73

Education Scotland six-point scale 
Ref:    SPMAN-1315769894-612 
Page 73

Page 74

Page 74

Page 75

1   |   Findochty Primary School, Moray Council, 5207126 © Crown Copyright
19 November 2024
Dear Parent/Carer
In September 2024, a team of inspectors from Education Scotland visited Findochty Primary
School. During our visit, we talked to parents/carers and children and worked closely with the
headteacher and staff.  
The inspection team found the following strengths in the school’s work.
• The warm, welcoming and nurturing ethos children learn in. Staff demonstrate care and
support for all children and ensure everyone is fully included in the life of the school. As
a result, children feel safe and secure with a strong sense of belonging. They behave
well and engage positively in their learning.
• The enthusiastic and hardworking staff team. They work well together to support children
to talk about and understand their emotions. As a result, they support children’s
wellbeing outcomes effectively.
• Staff’s approaches to improving children’s enthusiasm for reading. All staff have
supported children in a variety of ways to develop a love of reading. This is improving
children’s attainment in reading.
The following areas for improvement were identified and discussed with the headteacher and
a representative from Moray Council.
• With support from the local authority, improve approaches to gathering accurate
information that identifies clearly progress and next steps in whole school improvement. In
addition, staff should ensure they identify an achievable number of school improvement
priorities.
• Improve approaches to learning, teaching and assessment to ensure a consistently high
quality of experience for all children across the school. In particular, staff need to plan
learning that is appropriately progressive across all areas of the curriculum and meets the
needs of all children.
• Develop further the school’s new processes to track more effectively the progress of
children across all areas of the curriculum.
APPENDIX 1
Item 9.*
Page 75

Page 76

2   |   Findochty Primary School, Moray Council, 5207126 © Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using four quality indicators
from How good is our school? (4th edition). Quality indicators help schools, local authorities
and inspectors to judge what is working well and what needs to be improved. Following the
inspection of each school, the Scottish Government gathers details of our evaluations to keep
track of how well Scottish schools are doing. 
Here are Education Scotland’s evaluations for Findochty Primary
School 
Quality indicators Evaluation
Leadership of change  satisfactory
Learning, teaching and assessment satisfactory
Ensuring wellbeing, equality and inclusion good
Raising attainment and achievement satisfactory
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on
the Education Scotland website at:
Findochty Primary School | Inspection Report | Education Scotland 
What happens next? 
We are confident that the school has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. Moray Council will inform parents/carers
about the school’s progress as part of its arrangements for reporting on the quality of its
schools. 
Judith Reid
HM Inspector 
Page 76

Page 77

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 18 FEBRUARY 2025 
SUBJECT: INITIAL ANALYSIS OF ACHIEVEMENT OF CURRICULUM FOR
EXCELLENCE LEVELS 2024 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 This report provides Committee with a summary of the Moray data collected in
June 2024 and provided to the Scottish Government at the end of October
2024 regarding Teacher Professional Judgements (TPJ) on children achieving
Curriculum for Excellence levels (ACEL) at P1, P4, P7 and S3.  This data
appears in the Scottish Government report published in December 2024.   
1.2 This report is submitted to Committee in terms of Section III (C) 1 of the
Council’s Scheme of Administration relating to exercising all of the functions
of the Council as Education Authority within the terms of relevant legislation
with regard to nursery, primary and secondary education. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee:- 
(i) scrutinises and notes the content of this report; 
(ii) acknowledges work underway by Education and across our
schools using resources available in order to address identified
areas of underperformance and improve outcomes for all children
and young people; 
(iii) notes ACEL results for P1, P4, P7 and S3, improvement over time
and progress in relation to Stretch Aims set using available data
intelligence, as part of the Scottish Government and Education
Scotland Framework for Recovery and Accelerating Progress
requirements; and 
(iv) notes actions underway and planned in support of improving
outcomes for all learners and their ACEL achievement. 
Item 10.*
Page 77

Page 78

3. BACKGROUND 
3.1 The Scottish Government first published the National Improvement
Framework (NIF) for Scottish Education in January 2016. The First Minister at
that time described the document as being key in driving work to continually
improve Scottish Education and close the poverty related attainment gap,
delivering both excellence and equity.   
3.2 The revised 2025 National Improvement Framework was published in
December 2024 and replaces the 2024 NIF and Improvement Plan.  It is
stated that the vision for Scottish Education should be ambitious, inclusive
and supportive in order to deliver: 
• Excellence through raising achievement and improving outcomes:
ensuring that every child and young person achieves the highest
standards they can.
• Achieving equity: ensuring every child and young person has the same
opportunity to succeed. 
3.3 The key priorities of the National Improvement Framework remain as: 
• Placing the human rights and needs of every child and young person at
the centre of education
• Improvement in children and young people’s health and wellbeing
• Closing the attainment gap between the most and least disadvantaged
children and young people
• Improvement in skills and sustained, positive school-leaver destinations
for all young people
• Improvement in achievement, particularly in literacy and numeracy. 
3.4 Outcomes expected to be achieved through this focus are identified as: 
• A globally respected, empowered, and responsive education system with
clear accountability at every level that supports children, young people,
and adult learners to thrive. The system enables the development of their
knowledge, skills, values, and attributes that give them the best
opportunity to succeed and contribute to Scotland’s society and economy
• Young people experiencing the benefit of schools and early years settings
working in excellent partnerships with wider children’s services and other
partners, families, and communities, in line with the Getting it Right for
Every Child (GIRFEC) approach
• Inclusive and relevant curriculum and assessment which gives young
people the knowledge and skills necessary to contribute to society, and
shape a sustainable future, while celebrating and supporting progression
for all
• High levels of achievement across the curriculum for all learners, with
action to close the poverty-related attainment gap
Page 78

Page 79

• Highly skilled teachers and school-leaders driving excellent learning,
teaching and assessment for all, especially those with additional support
needs
• Improving relationships and behaviour, and attendance, with increased
engagement in learning and a culture of dignity and respect for all
• An education system engaging in digital technology to enhance all
aspects of learning and teaching, supported by a digitally-skilled
workforce and tackling digital inequality 
3.5 It is noted that despite challenges posed by the ongoing impact of the
pandemic, and the cost-of-living crisis there remain many strengths in Scottish
Education. The NIF in relation to Achievement of Curriculum for Excellence
(ACEL) levels noted the following from evidence available: 
• Record levels of literacy and numeracy attainment at primary and
secondary school level. (Scottish Government, ACEL data, 10 Dec 2024)
• Record low attainment gap in literacy for primary pupils, and in literacy
and numeracy at secondary level. (Scottish Government, ACEL data, 10
Dec 2024) 
3.6 As noted in the 2025 National Improvement Framework, in the coming year
and for the remainder of this Parliament, focus will be on improving the ABC –
attendance, achievement, behaviour and the curriculum in schools to boost
standards.  Full details on actions that will be taken to deliver outcomes,
evidence to support them and how progress will be measures will be set out in
due course and published early this year through the NIF Improvement Plan
2025.     
3.7 With regard to ACEL, Teacher Professional Judgement data is collected from
local authorities by Scottish Government with codes as shown in brackets is
as follows in respect of learner achievement in literacy and numeracy as
noted in 3.5 above: 
Literacy – Reading (R)
Literacy – Writing (W)
Literacy – Listening and Talking (LT)
Numeracy - Numeracy (N) 
3.8 Schools are required to submit data on Curriculum for Excellence (CfE) levels
for each child in primary schools stages P1, P4 and P7 and each young
person in secondary school stage S3.  The levels reported are Early, First,
Second, Third and Fourth.  CfE levels are determined by teachers following a
review of key evidence of learner achievement, including classwork,
homework, assessment, ongoing formative assessments and holistic task
achievement.  Teachers also work together and engage in a process of
moderation to ensure common understanding of what achievement of a level
looks like overall, guided by teacher planning, national guidance and
benchmarks.  Schools ensure levels achieved, learner progress and future
predictions are recorded using tracking and monitoring approaches in line with
Page 79

Page 80

our agreed and universal Moray Tracking Language.     
3.9 The data collected refers to the anticipated levels of attainment at the
following stages noting this may be earlier or later for some children and
young people depending on individual needs, as detailed from Education
Scotland. 
Level Stage (this may be earlier or later for some learners)
Early (E) The end of P1
First (1st) The end of P4
Second (2nd) The end of P7
Third (3rd)  The end of S3
Fourth (4th) Some pupils will also achieve this by the end of S3 
3.10 Following annual request for ACEL data submission for P1, P4, P7 and S3
stages, data was collected in June 2024 using our Seemis Progress and
Achievement module.  This followed ongoing work in schools on assessment,
moderation and professional commitment to all areas of teacher professional
judgement.   
3.11 ACEL data was submitted to Scottish Government in October 2024 following
a range of Quality Assurance processes from school staff and central officers. 
The initial data provided by schools was, in some cases, further quality
assured by central officers directly with schools and where necessary
provided with additional support and guidance to ensure the submission of
robust and reliable data.   
3.12 The Scottish Government ACEL national data was published in December
2024, providing a range of data across all of Scotland’s local authorities as
well as specific cohort and characteristic data.   
3.13 As requested by Scottish Government and Education Scotland guided by the
Framework for Recovery and Accelerating Progress, Stretch Aims have been
set in discussion with both organisations, and provide a basis for
measurement and review, to guide improvement activities moving forwards
across the service.  In respect of ACEL, the following provisional Stretch Aims
were set for Moray in discussion with Education Scotland and Scottish
Government colleagues with those pertaining to session 2023/2024 as
follows: 
2024
Stretch Aim
2026 Stretch
Aim
Primary (P1, P4 ,P7 combined) Literacy 67-70% 74%
Primary (P1, P4, P7 combined) Numeracy 70-74% 78%
Secondary (S3) Literacy (3rd level or above) 79-83% 88%
Secondary (S3) Numeracy (3rd level or above) 86-88% 89% 
Authority Approaches
Page 80

Page 81

3.14 In order to support schools with ongoing improvements in attainment at Broad
General Education level, a strategic approach within all Moray schools
continues to be adopted.  The development and implementation of the
following strategy areas is supporting more cohesive and planned
methodology to ensure practices to improve achievement for all learners
continue to be our Education vision in Moray.  These include: 
• National Improvement Framework Self-evaluation 
• National Improvement Framework Plan 2024-2025 outlining our actions for
Raising Achievement for all Learners
• Our Moray Standard: Learning and Teaching Strategy, support materials
and toolkits
• Our Moray Standard:  Supporting All Learners Strategy and support
materials
• Moray and Northern Alliance Curriculum Progressions for Literacy and
Numeracy
• ACEL Assessment and Moderation Guidelines
• QAMSO (Quality Assurance and Moderation Support Officer) Network
• Tracking and Monitoring Guidelines and Tracking Tools/System
• Moray Quality Improvement Framework and Quality Improvement team
support and challenge regarding data analysis, tracking and monitoring and
attainment discussions with all schools 
Primary 1 – Early level ACEL
3.15 The percentages noted below present the P1 ACEL data for the past 6 years
for Moray in comparison with the national averages.  Please note that there
was no Scottish Government data collected in 2019/2020 per section 3.10. 
Year P1
LT R W LIT. NUM.
2024 Moray 87 80 78 75 83
National 87 81 79 77 85
2023 Moray 86 78 75 71 81
National 87 81 78 76 85
2022 Moray 84 76 73 69 78
National 86 79 77 74 84
2021 Moray 85 77 71 69 78
National 84 77 74 71 81
2020 Moray 2019/20 data was not collected by
Scottish Government
2019 Moray 85 77 76 71 79
National 87 82 79 76 85 
3.16 Moray figures where highlighted in green above indicate where performance 
exceeds national average; amber indicates where performance is marginally
Page 81

Page 82

below and red highlight as notably below national average where appropriate. 
P1 data for 2024 shows that Listening and Talking is in line with National 
average, with Reading, Writing, Literacy overall and Numeracy near to and 
marginally below national averages.  The table below shows further 
comparison of Moray’s 2024 data with 2023 as previous year with similar 
colour coding to highlight changes: 
Year: LT R W LIT. NUM.
2023 Moray 86 78 75 71 81
2024 Moray 87 80 78 75 83
% Change Moray +1 +2 +3 +4 +2 
3.17 Listening and Talking, Reading, Writing, Literacy overall and Numeracy have 
all increased from 2023 in Moray as shown in green highlight above.  Three-
year trend information across all measures for P1 show yearly improvement 
over the three-year trend period.   Literacy ACEL overall has increased by 4% 
from 2023. While ACEL remains in line with National average for Listening 
and Talking and marginally below National comparators for other organisers 
as outlined in 3.19 above, positive improvement in performance is noted year 
on year, 2023 to 2024 once more, as highlighted above 
3.18 The following graphical representation of data trends over time are further 
presented for P1 for Listening and Talking, Reading, Writing, Literacy 
(Overall) and Numeracy.  Further commentary is provided alongside each 
graph. 
P1 - Listening and Talking 
Data trend over time now
exceeds pre-pandemic Moray
data from 2019 and in line with
2023 ACEL.  P1 Listening and
Talking is in line with 2024
national average (87%), 1%
above 2023 Moray average. 
2024 ACEL is highest recorded
for Moray across the 2018-2024
trend period, noting positive and
improving trend. 
Page 82

Page 83

P1 – Reading 
Data trend over time remains
above Moray pre-pandemic data
from 2019 and 2% above 2024
ACEL.  P1 Reading is 1% below
2024 national average.  2024
ACEL is highest recorded for
Moray across the 2018-2024
trend period, noting positive and
improving trend. 
P1 – Writing 
2024 data is above Moray pre-
pandemic data from 2019,
showing improvement of 3%
from 2023. P1 Writing is 1%
below 2024 national average. 
2024 ACEL is highest recorded
for Moray across the 2018-2024
trend period, noting positive and
improving trend (2021-2024). 
P1 – Literacy 
Literacy overall has increased
by 4% to 75%, highest across
the trend period presented. 
National average has also
increased by 1% from 2023
leading to a notably reduced 2%
gap remaining between Moray
and national average.  Noting
positive and improving 3-year
trend for Moray (2022-2024). 
Page 83

Page 84

P1 – Numeracy 
Numeracy has increased by 2%
from 2023 to 83%, highest
performance recorded across
the trend period presented. 
National average has remained
at 85% resulting in a reduced
2% gap between Moray and
national average in 2024. 
Noting positive and improving 3-
year trend for Moray (2022-
2024). 
Primary 4 – First level ACEL
3.19 The percentages noted below present the P4 ACEL data for the past 6 years
for Moray in comparison with the national averages.  Please note that there
was no Scottish Government data collected in 2019/2020 per section 3.10. 
Year P4
LT R W LIT. NUM.
2024 Moray 84 77 68 66 73
National 87 79 74 71 78
2023 Moray 84 76 69 66 73
National 87 78 72 70 77
2022 Moray 81 73 67 61 69
National 85 76 70 67 75
2021 Moray 82 73 66 61 64
National 82 73 67 64 72
2020 Moray 2019/20 data was not collected by
Scottish Government
2019 Moray 78 72 63 60 65
National 85 78 73 70 77 
3.20 Moray figures where highlighted in green indicate where performance 
exceeds national average; amber indicates where performance is marginally 
below and red highlight as notably below national average where appropriate. 
P4 data for 2024 shows that all Literacy elements and Numeracy are noted as 
marginally below, or below national averages.  The table below shows further 
comparison of 2024 data with 2023 as previous year with similar colour 
coding applied: 
Year: LT R W LIT. NUM.
2023 Moray 84 76 69 66 73
2024 Moray 84 77 68 66 73
% Change Moray 0 +1 -1 0 0
Page 84

Page 85

Reading has increased by 1% from 2023.  Listening and Talking, Literacy
(overall) and Numeracy have remained at previous year percentage
achievement for this year’s cohort. Writing ACEL has decreased by 1% from
2024 ACEL cohort data collection.   
3.21 The following graphical representation of data trends over time are further 
presented for P4 for Listening and Talking, Reading, Writing, Literacy 
(Overall) and Numeracy.  Further commentary is provided alongside each 
graph. 
P4 - Listening and Talking 
Data trend over time remains
positive overall compared with
pre-pandemic data from 2019
and in line with 2023 ACEL
(84%), highest across trend
period for second year at 84%. 
Moray’s P4 Listening and
Talking remains 3% below 2024
national average, common with
2023. 
P4 – Reading 
Data trend over time remains
positive overall compared with
pre-pandemic data from 2019
and 1% above 2023 ACEL (77%
compared to 76%).  P4 Reading
is 2% below 2024 national
average, where 2024 is noted
as highest performance across
the trend period presented at
77%, showing yearly
improvement. 
P4 – Writing 
Slight decrease in Writing of 1%
is noted from 2023, second
highest ACEL percentage
across trend period.  National
average in 2024 has increased
by 2% from 2023 with Moray
reducing by 1%, year on year
(2023 to 2024). Moray ACEL is
6% below 2024 national
average. 
Page 85

Page 86

P4 – Literacy 
Literacy overall in 2024 has
remained constant at 66%,
compared with 2023.  National
average has increased by 1%
from 2023 leading to a 5% gap
between Moray and national
average in 2024 (6% gap in
2022, 4% gap in 2023).  P4
Literacy overall remains joint
highest percentage overall
across trend period 
P4 – Numeracy 
Numeracy in 2024 has
remained constant at 73%,
compared with 2023.  National
average has increased by 1%
from 2023 to 78% leading to a
5% gap between Moray and
national averages in 2024 (4%
gap in 2022.  P4 Numeracy
remains joint highest
percentage overall across trend
period 
Primary 7 – Second level ACEL
3.22 The percentages noted below present the P7 ACEL data for the past 6 years
for Moray in comparison with the national averages.  Please note that there
was no Scottish Government data collected in 2019/2020 per section 3.12. 
Year P7
LT R W LIT. NUM.
2024 Moray 87 82 73 72 74
National 88 81 76 74 78
2023 Moray 82 78 70 66 74
National 87 81 75 73 78
2022 Moray 83 74 70 65 69
National 86 79 73 71 76
2021 Moray 80 71 64 62 62
National 82 76 69 66 72
2020 Moray 2019/20 data was not collected by
Scottish Government
2019 Moray 81 76 67 64 66
National 86 80 74 71 76 
Page 86

Page 87

3.23 Moray figures where highlighted in green above indicate where performance 
exceeds national average; amber indicates where performance is marginally 
below and red highlight as notably below national average where appropriate. 
P7 data for 2024 shows that Reading is 1%  above National average. 
Listening and Talking, Writing, Literacy overall and Numeracy and marginally 
below national averages.  The table below shows further comparison of 2024 
data with 2023 as previous year with similar colour coding applied: 
Year: LT R W LIT. NUM.
2023 Moray 82 78 70 66 74
2024 Moray 87 82 73 72 74
% Change Moray +5 +4 +3 +6 0 
3.24 The following graphical representation of data trends over time are further 
presented for P7 for Listening and Talking, Reading, Writing, Literacy 
(Overall) and Numeracy.  Further commentary on trends over time is provided 
to the right of each graph. 
P7 - Listening and Talking 
P7 Listening and Talking has
increased by 5% to 87%, with
increase in national average by
1% to 88%.  A 1% gap is now
present in 2024, compared with
5% in 2023.  Performance for
Moray is highest across the data
trend period presented,
marginally below national
average for 2024. 
P7 – Reading 
Data trend over time remains
positive with a further 4%
increase from 2023 to 82%. 
National average remains
constant at 81% highlighting
Moray performance above
national average by 1% in 2024. 
Compared with pre-pandemic
data from 2019 (76%) and trend
over time, 2024 performance at
82% is highest across the trend
period presented, with 3% and
4% increases also noted from
2021 to 2022 and 2022 to 2023. 
Page 87

Page 88

P7 – Writing 
Writing has improved in
performance over time and in
relation to 2023, 73% ACEL
level achievement in 2024 and
positive overall compared with
pre-pandemic data from 2019. 
National average has increased
by 1% from 2023 with Moray
below national average by 3%
compared with 5% in 2023. 
Highest ACEL for P7 Writing
noted in 2024 across trend
period presented. 
P7 – Literacy 
Literacy overall has increased to
72%, 6% increase on 2023 and
highest year’s performance
across trend period presented. 
National average has increased
by 1% from 2023 to 74%
leading to a 2% gap between
Moray and national averages in
2024 (6% gap noted in 2022,
7% gap noted in 2023). Highest
performance across trend
period presented. 
P7 – Numeracy 
Numeracy overall has remained
constant at 74% compared with
2023 and is favourable
compared with pre-pandemic
2019 average (66%).  National
average has  also remained at
78% compared with 2023,
where a 4% gap between Moray
and national averages remains
in 2024 as it was in 2023 (7%
gap noted in 2022, 10% gap in
2021).  Improvement trend over
time remains positive overall.   
Secondary 3 (S3) – Third level ACEL and Fourth level ACEL
Page 88

Page 89

3.25 The percentages noted below present the S3 ACEL data for the past 6 years
for Moray in comparison with the national averages for ACEL 3rd level and
ACEL 4th level.  Please note that there was no Scottish Government data
collected in 2019/2020 or 2020/2021 for S3 pupils per section 3.10. 
ACEL 3rd level
Year Third level
LT R W LIT. NUM.
2024 Moray 89 89 88 87 87
National 91 90 90 88 90
2023 Moray 89 89 87 86 87
National 91 90 89 88 90
2022 Moray 82 80 77 72 86
National 89 88 87 86 89
2021 Moray/National 2020/21 data was not collected by
Scottish Government
2020 Moray/National 2019/20 data was not collected by
Scottish Government
2019 Moray 90 88 87 83 92
National 91 91 90 88 90 
ACEL 4th level
Year Fourth level
LT R W LIT. NUM.
2024 Moray 68 68 63 61 63
National 64 63 61 58 65
2023 Moray 62 63 57 54 58
National 63 62 60 56 63
2022 Moray 44 45 43 37 55
National 55 54 52 48 59
2021 Moray/National 2020/21 data was not collected by
Scottish Government
2020 Moray/National 2019/20 data was not collected by
Scottish Government
2019 Moray 35 31 29 24 56
National 57 55 52 48 59 
3.26 Moray figures where highlighted in green above indicate where performance 
exceeds national average; amber indicates where performance is marginally 
below and red highlight as notably below national average where appropriate. 
S3 data for 2024 at 3rd level ACEL achieved in S3 shows that all Literacy 
elements are marginally below national averages.  At 4th level ACEL, all 
Literacy elements including Literacy overall are above national averages,
Page 89

Page 90

Numeracy is marginally below national averages at 3rd and 4th levels in 2024. 
The table below shows further comparison of 3rd and 4th level 2024 data with 
2023 as nationally published ACEL data by Scottish Government, with colour 
coding applied to highlight changes in performance year on year, 2023 to 
2024. 
ACEL 3rd level
Year: LT R W LIT. NUM.
2023 Moray 89 89 87 86 87
2024 Moray 89 89 88 87 87
% Change Moray 0 0 +1 +1 0 
ACEL 4th level
Year: LT R W LIT. NUM.
2023 Moray 62 63 57 54 58
2024 Moray 68 68 63 61 63
% Change Moray +6 +5 +6 +7 +5 
Listening and Talking, Reading, Writing, Literacy overall and Numeracy have
witnessed positive increase on 2023 Moray ACEL averages at 4th level,
resulting in 7% increase in Literacy overall and 5% increase in Numeracy.  At
3rd level, all Literacy organisers including Literacy overall and Numeracy
remain comparable to 2023 ACEL overall with exception increases in Writing
and Literacy overall, (1%, 1%). 
3.27 The following graphical representation of data trends over time are further 
presented for S3 for Listening and Talking, Reading, Writing, Literacy 
(Overall) and Numeracy at third and fourth levels.  Further commentary on 
trends over time is provided to the right of each graph. 
S3 - Listening and Talking
3rd level 
2024 ACEL (89%) is in line with
2023 Moray ACEL, remaining
2% below national average
(2023:  91%, 2024:  91%). 
Comparable to 2019 pre-
pandemic performance of 90%
with sustained performance
noted at 3rd level.  No change in
Moray or national averages year
on year (2023 to 2024) for S3
Listening and Talking (3rd level). 
Page 90

Page 91

S3 - Listening and Talking
4th level 
2024 ACEL of 68% is the
highest across the trend period,
exceeding 2024 national
average by 4%. Positive
improvement in performance
compared with 2023 and
positive trend over time across a
3-year trend period, post-
pandemic. 
S3 – Reading
3rd level 
2024 ACEL of 89% remains
comparable to 2023 data, where
national average also remains
constant (90%).  Sustained
performance comparable to pre-
pandemic 2019.  Overall, in line
with 2024 national average (1%
below), where 2023 is also1%
below national average. 
S3 – Reading
4th level 
Positive increase of 5% on
Moray 2023 data in 2024
highlighting positive
improvement in performance,
5% above 2024 national
average (63%).  Highest
performance across the trend
period presented and positive
compared with pre-pandemic
Moray averages and 2023. 
40
55
35
57
0 0 0 0
44
55 62 63 68 64
0
10
20
30
40
50
60
70
80
Moray
National
Moray
National
Moray
National
Moray
Moray
Moray
National
Moray
National
Moray
National
2018 2019 2020 2021 2022 2023 2024
Listening and Talking - S3 - 4th Level
Page 91

Page 92

S3 - Writing 
3rd level 
2024 data highlighting positive
improvement in performance of
1%, remaining 2% below
national average.  Highest
performance across trend
period.  2024 national average
increase (90% in 2024
compared with 89% in 2023),
results in 2% gap remaining
between Moray and national. 
S3 – Writing
4th level 
2024 data highlighting positive
improvement in performance to
63%, 2% above 2024 national
average and 6% above Moray
2023 average.  Significant
reduction in attainment gap is
presented, highest performance
noted across trend period. 
S3 - Literacy 
3rd level 
2024 data highlights
improvement, compared with
2023 (87, 1% increase%) now
1% below national average
(2023:  2% below).  National
average remaining constant
(2023-2024) at 88%.  Highest
performance across trend
period presented.  Positive
increase in ACEL Literacy
overall performance. 
Page 92

Page 93

S3 - Literacy 
4th level 
Literacy at 4th level has
increased to 61%, higher than
previous years recorded and
above 2024 national average by
3%.  National average also
witnessing increase by 2%. 
Positive increase in
performance overall, highest
across trend period presented. 
S3 – Numeracy
3rd level 
Numeracy at 3rd level has
remained constant at 87%.  
National average has also
remained at 90% leading to a
continuing 3% gap between
Moray and national average in
2024 (also 3% in 2022 and
2023).  Marginally below
national average in 2024. 
S3 – Numeracy
4th level 
Numeracy at 4th level has
increased by 5% to 63% and is
favourable compared with pre-
pandemic 2019 average (56%)
and 2023 (58%).  National
average has increased to 65%
leading to a reduced 2% gap
between Moray and national
averages in 2024 (4% gap in
2022, 5% gap in 2023). 
P1/P4/P7 Literacy and P1/P4/P7 Numeracy Combined Measure and
Stretch and Stretch Aims
3.28 Data analysis relating to S3 Literacy (Combined) and S3 Numeracy have 
been provided in 3.28 above.  Further analysis for P1/P4/P7 combined 
measure for Literacy and Numeracy is provided below. 
Page 93

Page 94

P1/P4/P7 - Literacy 
(Combined) 
P1/P4/P7 Literacy (combined)
has increased to 71% and is 3%
higher than 2023 continuing on
positive improving trend. 
National average has increased
by 1% from 2023 leading to a
3% gap between Moray and
national averages in 2024 (5%
gap in 2023 and 6% gap based
on 2022 averages).  Highest
performance noted in 2024
across the trend period outlined
and positive improvements in
performance. 
P1/P4/P7 Numeracy 
(Combined) 
P1/P4/P7 Numeracy (combined)
has increased by 2% to 77%
and is favourable compared with
2023 (75%) and 2022 (72%)
averages.  National average has
remained constant compared
with 2023 (80%) with a reduced
3% gap between Moray and
national averages in 2024
compared to a 5% gap noted in
2023 (6% gap in 2022). 
P1/P4/P7 and S3 Literacy and Numeracy (Combined) Stretch Aims
3.29 Following review of all data and analysis, the following Core Stretch Aims 
which had been set as requested by Scottish Government and monitored by 
Education Scotland following publication of the Framework for Recovery and 
Accelerating Progress nationally in relation to ACEL.   Stretch Aims  were 
reported previously to Education, Children’s and Leisure Services Committee 
(25 January 2023, item 8  Stretch Aims Appendix 1; refreshed in line with 
Education Scotland’s update to the Framework for Recovery and Accelerating 
Progress.  Progress towards revised Stretch Aims is further reported annually 
through the Moray Education National Improvement Framework Self-
evaluation and Action Plan (17 September 2024, item 8:  Education National 
Improvement Framework Report 2023-2024 and Plan 2024-2025). 
2024
ACEL Stretch
Aim Trajectory 
2024
ACEL 
Actual Progress
2026
Aspirational
Stretch Aim
Page 94

Page 95

Primary Literacy
(P1, P4 ,P7 combined) 67-70% 71% ✓ 74%
Primary Numeracy
(P1, P4 ,P7 combined) 70-74% 77% ✓ 78%
Secondary (S3) Literacy 
(3rd level or above) 79-83% 87% ✓ 88%
Secondary (S3) Numeracy 
(3rd level or above) 86-88% 87% ✓ 89%  
3.30 Progress towards stretch aims based on annual trajectory remains positive as 
noted above.  P1, P4, P7 Literacy and Numeracy combined, and S3 Literacy 
(3rd level or above) exceed the 2024 ACEL trajectory range set.  Secondary 
(S3) Numeracy (3rd level or above) is within the trajectory range.  Early 
indications would suggest that progress towards 2026 aspirational stretch 
aims remains positive across key stretch aims measures above. 
3.31 As an education service, we continue to monitor in greater depth the 
performance of individual groups of children and young people in relation to 
specific characteristics.  This includes Scottish Index of Multiple Deprivation 
(SIMD) characteristics, looked after children and young people and 
achievement for children and young people with Additional Support Needs 
(ASN).  Due to low number of children in SIMD quintiles 1 and 5 and low 
number of children and young people with looked after status, data is subject 
to disclosure control where SIMD quintiles align to specific school localities.   
3.32 As part of the role of the Moray Quality Improvement team, discussions with 
schools regarding their whole school and individual cohort data takes place on 
a systematic and rigorous basis in line with our Moray Quality Improvement 
Framework.  As a result and due to individual school context nature of learner 
achievements, further specific school data pertaining to class composition, 
school size and class numbers is not provided in this Moray overall 
performance report where direct correlation between these aspects and 
individual school attainment is not commonly identified following central 
Quality Improvement Team data interrogation and review.     
3.33 Overall, data has shown improvement across almost all measures based on 
Moray averages from 2023 to 2024 with exception of P4 writing, showing very 
marginal reduction.  Overall attainment gap between Moray and National 
averages has reduced further across almost all measures, with current year 
P1 Listening and Talking and P7 Reading above national averages.  In S3, 4th 
level Listening and Talking, Reading, Writing and Literacy overall exceed 
national averages. 
3.34 As noted in 3.30 and 3.31 above and in line with Scottish Government and 
Education Scotland’s Framework for Recovery and Accelerating Progress we 
have made positive progress in relation to annual trajectory range set for 
ACEL achievement for 2024 with positive steps towards achieving agreed 
stretch aims by 2026. 
Page 95

Page 96

3.35 As an Education Service, we will continue to progress with key actions noted 
below which are underway or planned in order to continue to raise attainment
in literacy and numeracy: 
• Finalisation of the Moray Literacy and Numeracy Strategies developed as
part of the Moray Improvement Groups for Literacy and Numeracy,
currently progressing through internal finalisation processes, providing
consistent guidance for delivery of literacy and numeracy based learning
• Further embedding of Moray and Northern Alliance Literacy and Numeracy
curriculum progressions for literacy and numeracy in order to ensure
breadth, challenge and enjoyment in learning as well as application of
learning in new and unfamiliar contexts, ensuring progression in learning
across the ACEL levels
• Continued development of the Quality Assurance and Moderation Support
Officer (QAMSO) network supported by a Quality Improvement Officer and
Primary Head Teacher, extending support for Teacher Professional
Judgements when determining ACEL through agreed moderation
processes and support materials for undertaking moderation at stage,
school and wider Associated Schools Group/Family Improvement Group
levels
• Continued moderation activities in our schools, within and across stages
and within Associated Schools groups to ensure shared understanding of
national standards for learner achievement of a level
• In order to increase P4 Writing attainment, five schools supported by our
Education Scotland Attainment Advisor, a Quality Improvement Officer and
Educational Psychologist are participating in the Children and Young
People’s Collaborative (CYPiC) Improving Writing project with proven
national results in raising attainment in P4 writing for participating schools. 
This will be further extended this year, adding a further 6 schools
approached to participate in this programme, underpinned by improvement
methodology and consistent approaches
• Extended tracking and Monitoring through use of Seemis Progress and
Achievement with support from the Moray AnalyseM data analysis tool,
resources and planning materials developed to strengthen data literacy
and analysis
• Continue to embed the revised Moray Quality Improvement Framework
with particular regard to ACEL Early Indication data analysis at key stages
during each school session and data collection, analysis and central
Quality Improvement team follow-up and discussions with schools and
Head Teachers, after each data collection event for early intervention and
support for raising attainment
• Quality Improvement Team visits to schools with particular focus on
learning, teaching and assessment, observation of learning and review of
data in order to identify strengths and guide key improvements required at
individual school level
• Continued training of staff on National Standardised Assessments with
support from our Scottish Government regional trainers, adding to
evidence base and knowledge of analysis when 
• Continued scrutiny by the Quality Improvement Team of school
performance with targeted support visits where required in order to 
Page 96

Page 97

• Stretch Aims continue to be used as a focus for future improvement
activities for key literacy and numeracy measures as outlined in 3.30
above, with ongoing monitoring at local authority level to gauge progress
and areas for further focussed improvement
• Continued emphasis on provision of high quality learning experiences in
line with Our Moray Standard for Learning and Teaching and local school
context interpretation.  Investment in Power Up Your Pedagogy across our
schools with further roll-out of the Northern Alliance Learning and
Teaching toolkit has led to further development of teacher learning
communities, strengthening pedagogical practice through reflection and
working together
• Continued work on the review of Additional Support Needs and mandatory
training for staff in support of meeting learning needs.  This includes
training for teaching and non-teaching staff in order to support a diverse
range of learners where they may have specific needs or require
supportive interventions
• Further use of Scottish Attainment Challenge (Pupil Equity Fundings,
Strategic Equity Funding and Care Experienced Children and Young
People Funding) in order to support identified children and young people
with regard to closing poverty related attainment gaps and in provision of
key supports and interventions for raising attainment in literacy and
numeracy 
• Further focus on Moray secondary schools and learning journey through
the S1-S3 Broad General Education (BGE) to the S4-S6 Senior Phase,
ensuring that learner level achievement continue to build in the BGE in
order to raise attainment in the Senior Phase through targeted school visit
programme, reviewed target setting and enhanced scrutiny of attainment
data with planned next steps 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)
Reflective of priorities within the Corporate Plan 2024-2029 with
particular regard to ‘Tackle Poverty and Inequality’ where we look to get
it right for every child so that we continue to improve attainment for all,
with focus on improved attainment in the Broad General Education
through ACEL measures and success through percentage of P1, P 4
and P7 pupils combined achieving excepted CfE level in literacy and
numeracy as well as reduction in identified attainment gaps.  With
regards to the 10 Year Plan (Local Outcomes Improvement Plan LOIP),
(2) building a better future for children and young people in Moray
through equity of learning experience offered across Moray’s schools. 
(b) Policy and Legal
It is the duty of the Council to secure improvement and the quality of
school education which is provided in schools managed by
Headteachers and to raise standards of education (Section 7, 8 of
Standards in Scotland’s Schools etc Act 2000). 
Page 97

Page 98

(c) Financial implications
There are no financial implications arising directly from this report.
Continued support from finance is required in order to ensure timely
financial updates in order to guide spending plans in line with statutory
reporting and external scrutiny requirements. 
(d) Risk Implications 
There are risk implications if we cannot support national expectations 
and requirements in relation to this key national policy directive. The 
risks associated with inability to support expectations and requirements 
are the potential negative impact on school inspection reports and in the 
failure to improve learner achievement and attainment. This would have 
a direct impact on any reporting to the Scottish Government and 
Education Scotland on National Improvement Framework areas and 
progress or achievement of Stretch Aims as part of the Framework for 
Recovery and Accelerating Progress.   
While some recent improvement is noted, schools continue to be
impacted by ongoing digital connectivity and bandwidth issues in respect
our ICT Education network operating in schools.  As a results, schools
continue to report operational issues with ICT infrastructure, log-in times,
access to core software, devices and poor connectivity having notable
impact on learning, teaching and assessment, learner access to digital
platforms, school administration, also impeding exploration of school-to-
school/school to external learning partner digital consortia approaches. 
Colleagues within ICT continue to work closely with schools within
existing resources in order to remedy issues arising on an ongoing basis,
where Education colleagues appreciate ongoing support provided. 
Improvement in digital  provision is required in order to realise positive
consortia approaches and digitally enabled learning and teaching, with
absence of 1:1 devices for learners in Moray impacting on learner
experiences.  Looking outwards where local authorities are digitally
enabled, this is having direct positive impact on learning, teaching and
assessment and overall achievements of learners in schools where
equity in digital access is supported for all.  As new digital technologies
continue to be explored, this is of further concern as we look to the
curriculum of the future. 
A number of schools continue to observe an increase in children and
young people with specific Additional Support Needs (ASN) and Social,
Emotional and Behavioural Needs (SEBN) where due to these needs,
access a personalised curriculum with individual targets and outcomes. 
This requires schools to allocate resources available in a targeted way
and has an impact on overall attainment levels and universal supports
available.  Increased reports of anti-social and disruptive behaviours
among a very small minority of young people in secondary, has impacted
on learning and diverted staff from supporting wider pupils/groups. 
Page 98

Page 99

It is acknowledged that budget pressures and resulting savings may
arise in the future, leading to potential reduction in resources and
supports available to schools.  This will have a direct impact on
attainment levels for children and young people, were reduced universal
or targeted supports to schools accessible.  Schools will require timely
and accurate financial information in order to plan for interventions, using
all funding available to them including Pupil Equity Funding.   
(e) Staffing Implications
There are no staffing implications arising directly from this report.  In
recent sessions, particular difficulties in recruitment to Secondary School
posts in Maths and English have been experienced as well as discrete
Science based subject areas.  This has resulted in schools developing
creative timetabling approaches through, for example, appointment of
BGE Teachers of Literacy and Numeracy who are Primary qualified but
within registration requirements, may teach specific Broad General
Education classes.   
(f) Property
There are no property implications arising directly from this report. 
(g) Equalities/Socio Economic Impact
An Equality/Socio Economic Impact Assessment is not required as this
report is to inform Committee on performance. 
(h) Climate Change and Biodiversity Impacts
No climate change or biodiversity implications have been determined
due to the scrutiny and performance based nature of activities reported
and no findings related to such implications contained herein.  Move to
virtual meetings and platforms where possible for certain activities (e.g.
Moderation using Microsoft Teams, Subject Groups) has reduced
potential impact of carbon emissions and pollution caused by staff travel
by car to central locations.     
(i) Consultations
Senior Officers in Education, Communities and Organisational
Development, the Equal Opportunities Officer, the Human Resources
Manager and Caroline O’Connor, Committee Services Officer have been
consulted and are in agreement with the contents of this report as
regards their respective responsibilities. 
5.  CONCLUSION 
5.1  ACEL attainment based on key Moray datasets and trends is presented
within this paper for P1, P4, P7 and S3 for Literacy (Reading, Writing,
Listening and Talking) and Numeracy for 2024, including performance and
trends over time.  Noted improvements in performance across almost all
measures from 2023 have been identified and analysed.  While noted
within the paper that performance remains marginally above, marginally
below or in line with national averages overall, improvements are noted
Page 99

Page 100

within key literacy elements and numeracy at different stages and levels. 
Data comparisons are made against the national average where
improvements in performance continue to be realised year on year for
almost all measures. 
5.2 Moray schools continue to use all resources available to them in including
Pupil Equity Fund and Strategic Equity Fund as appropriate, in order to
implement targeted and universal supports and approaches.  As a result,
attainment gaps have witnessed reduction across almost all measures
from 2023 to 2024.  A range of key actions have been initiated or continue
to progress as noted in 3.36 above, strengthening our approach to raising
attainment and Teacher Professional Judgements (TPJ) on learner level
achievement. 
5.3 Positive progress towards Stretch Aims has been realised overall as
outlined in para 3.30, required by Scottish Government and Education
Scotland as part of the revised framework for recovery and accelerating
progress as both prudent and aspirational targets for improvement.  We
exceed or remain within 2024 annual trajectory data ranges for Stretch
Aims set, with positive progress noted at this time towards ultimate 2026
aspirational Stretch Aims. Further key service actions in pursuit of
strengthened attainment are outlined in our NIF Plan 2024-25. 
5.4 Committee is invited to scrutinise data and key messages reported and
acknowledge work planned or ongoing to improve ACEL, centrally and
across Moray schools with most recent 2024 ACEL and performance over
time outlined within this paper against national comparator figures. 
Author of Report: Stewart McLauchlan, Quality Improvement Manager 
Background Papers: 2025 National Improvement Framework 
Framework for Recovery and Accelerating Progress 
Education National Improvement Framework Report
2023-2024 and Plan 2024-2025
Ref:             SPMAN-1315769894-611 
Page 100

Page 101

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 18 FEBRUARY 2025 
SUBJECT: ADDITIONAL SUPPORT NEEDS ALLOCATIONS 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To advise Committee of the proposed allocation methodology for Additional
Support Needs (ASN) (teachers and support staff) for session 2025/26. 
1.2 This report is submitted to Committee in terms of Section III (D) (1) of the
Council's Scheme of Administration relating to all the functions of the Council
as an Education Authority. 
2. RECOMMENDATIONS 
2.1 It is recommended that Committee: 
(i) agrees the methodology to be used for school ASN allocations; 
(ii) scrutinises and notes the work being carried out regarding nursery
allocations and agrees with the proposal in paragraph 3.4; and  
(iii) agrees to work continuing to develop a new process for ASN
funding moving from one school to another where there is a
significant change in circumstances and/or need. 
3. BACKGROUND 
3.1 The review of Additional Support Needs in the Council has been ongoing for
some time with various reports to Committee.  After a significant moderation
exercise, a report was presented to this Committee on 27 March 2024 (para 8
of the minute refers) to provide details of work to date and agreeing the
maintenance of budget allocated for ASN staffing to be shared on a pro rata
basis.  The option agreed maintained teacher numbers and allocated support
staff hours based on need. 
Item 11.*
Page 101

Page 102

3.2 This resulted in an agreed total budget of £14.3m for Early Years, teachers
and support staff in schools and a contingency for emerging need of £0.6mm
to be used to support emergent need for pupils coming into Moray, as well as
those with a significant change in circumstances.   In addition to this, the ASN
Resource Group (ARG) has an operational budget of £0.956m which is for
requests for transport, equipment and other support.  The group meets
fortnightly to consider and allocate requests.   
3.3 The Committee on 27 March 2024 also approved budget of £0.7m, which is
included in the £0.956m for ARG, to fund adapted curriculum for those
children and young people attending central ASN provision i.e. Pinefield Parc,
Moray Adapted Curriculum (based in East End Annexe) and the newly
developed Flexible Learning Resource (FLR) Central (based in East End
Annexe). 
3.4 Plans were in place to create a physical FLR in the Forres Associated School
Group, (ASG) temporarily until the new Forres Academy is complete. 
However the situation with the capital budget of the Council has prevented
this and so the resource in terms of staffing will be utilised across the ASG. 
Similarly, an FLR in Buckie was also planned given the level of need in the
area.  This too is on hold given the position of the Capital Plan and budge.  In
the meantime, the service will recruit to the posts and either use this in the
central ASN service as outreach or deploy within the Buckie ASG. 
3.5 The moderation exercise was particularly effective for school based
allocations.  However follow up review of nursery allocations has evidenced
that this has been less effective.  As a result officers are reviewing the
approach taken to consider developmental needs that require support
alongside emerging or already identified ASN needs.  This review will be
completed through creation of a short life working group, involving Early
Learning and Childcare (ELC) cross sector representation to gain further
feedback and test methodology. The short life working group compiled of
officers and partners intend to have the new approach for ELC allocations
completed before the end of this session. The funding for nursery will be
separated from the total budget ie £1.25m so that the allocations can be
finalised and budget available is known.   
3.6 Allocations are now provided to the school or setting and not to a child.  This
provides Head Teachers and Nursery Managers with autonomy to manage
the resource as they wish by timetabling support staff and teachers to work
with groups of pupils or individuals as appropriate.   
3.7 Once agreed, the allocations for 2024/25 were set for the session ahead. 
Where there was a significant reduction in the level of need in a school or
setting, due to timely interventions or other reasons, the budget remained in
the school.  Conversely, where a school or setting saw a significant increase
in the level of need, an additional allocation was made using ARG funding. 
This put some pressure on the emerging need monies where the school with
an increase in need had to request additional funding through the ARG group. 
The service are working with Finance and Human Resources on a process for
funding so that it moves when need significantly changes or moves from one
school to another in Moray and this will be in effect for August 2025.   
Page 102

Page 103

3.8 Due to the significant ASN moderation process last year and an increased
understanding of context, it has been possible to more accurately forecast the
level of need within individual settings. ASN officers continue to track
movement of need across and into the authority to ensure that the appropriate
level of support is available to settings in a timely manner. This will continue
next year with the proposed development work in allocations to ELC settings.
A barrier to the accurate forecasting of need is the level of placing requests
received during the year. 
3.9 To ensure a continued confidence in the level of support in settings, a process
of re-moderation will commence in February.  Schools who have reported a
large change of need will be visited in the first instance with some other
settings being visited on an ad hoc basis being mindful of equity across the
system. 
3.10 The roll out of a comprehensive training programme and professional
development programme has made an impact on schools and settings ability
to meet a growing and diverse range of needs. 
Proposal For ASN Allocations
3.11 It is proposed that the funding for ASN is maintained at the same level as last
year, taking into account pay awards allocated.  This will maintain teacher
numbers and allocate support staff hours based on needs. Allocations will be
based on session 2023/24 moderation exercise, awareness of change of
need across the year, ARG requests in 2024-25 and re-moderation
information. No request is being made for any additional funding for emerging
need as the service will monitor and track requests for a further year to gauge
demand.  A Moray wide change management plan for support staff (PSAs)
will take place to take into account where there has been a significant change
of additional support need within settings.  However, due to the significant
staffing exercise undertaken last year this is anticipated to involve less
movement of PSA staff. There will be no movement of teaching staff. 
3.12 The funding for this would support: 
Teachers (89.78 fte)    £6.6m 
Support Staff (7,900 hours per week)  £5.9m 
ELC       £1.2m 
Emerging Need/Contingency   £0.6m 
Total:       £14.3 m 
This gives a total cost of £14.3m which is within budget and also allows a
contingency to support emergent need for pupils coming in to Moray as well
as those with a significant change in circumstances.   
In addition there will be continuation of the £0.956m for Adapted Curriculum.  
Next Steps
3.13 All schools will be advised of their allocation prior to the end of this term. 
Page 103

Page 104

3.14  Nursery allocations have a different process to school based allocations due
to the shorter period that children attend the settings and so are on a
temporary basis rather than permanent as they change annually.  It is
anticipated that they will be advised of their initial allocation for August intake
in May and again before January intake and Easter intake.  However, this will
be based on the agreed approach taken by the working group. 
3.15 A draft ASN forecasting tool has been developed however this will need
further refinement.  Officers are monitoring this as further data emerges
including the movement of need when placing requests are made, particularly
from one enhanced provision school to another.  In addition, there is also a
pilot in early years looking at data from health services which has been looked
at across two associated schools groups with further pilot in a third.  A
remoderation process has started using information from placing requests and
ARG group requests and this is targeted at those schools who have seen a
significant increase or decrease in need during the course of the year. 
Officers will continue to develop a process for the movement of funding from
one school to another within an academic year. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
This report supports the LOIP outcomes:
Building a better future for children and young people in Moray:
• A place where children and young people thrive;
• A place where they have a voice, have opportunities to learn and
can get around;
• A place where they are able to reach their full potential. 
Also the aims of the Corporate Plan to:
• Provide opportunities where young people can achieve the
potential to be the best they can be 
(b) Policy and Legal
There are no policy or legal implications arising directly from this report. 
The Council has a statutory duty to make adequate and efficient
provision for the additional support required by each child or young
person for whose school education it has responsibility for, in term of the
Education (Additional Support for Learning) (Scotland) Act 2004.  The
ASN Review implementation is proceeding within the context of this
legislation and also the recommendations of the Morgan Review.
.
(c) Financial implications
The financial implications are as follows: 
Total funding    £14.3m
Made up of:
Funding for Teachers   £6.6m
Funding for Support Staff  £5.9m
Funding for Nursery   £1.2m
Emerging Need/Contingency £0.6m
Page 104

Page 105

In addition – ARG/Adapted Curriculum £0.956m 
In addition it is noted that the lack of capital budget is a constraint in the
planned approach to roll out Flexible Learning Resources across Moray.   
(d) Risk Implications
The main risks around meeting the needs of learners is around ASN
Tribunal applications should there be dissatisfaction on whether the
Council is meeting the needs of any individual young person.   
Due to Moray having military establishments in its communities, there is
also risk attached to any movement and our ability to meet emerging
needs for children moving to Moray and expectations to replicate
specialist provision elsewhere. 
In addition there are financial risks whereby the service is operating
within budget (taking into account pay awards) although the level of need
is increasing.  This means schools and settings are receiving a smaller
proportion of overall funding.  In addition the capital plan/budget position
is constraining the service from plans to implement a further FLR in the
Buckie area. 
The service is not currently engaging with the Parent/Carer Action group
as elected members and the Interim Chief Executive have been working
with them.  This is a risk although a parent/carer survey is being sent out
this term to consult with the wider parent/carer body and the service has
plans to implement an ASN Parent/Carer Support Group. 
(e) Staffing Implications
There will be a Moray change management plan process this year
however the reduction/increase of staff hours for support staff will not be
significant.    Any workforce implications will be managed in accordance
with agreed Council policy and procedure.  There will be no teacher
movement. 
Although the FLRs will not progress due to capital budget restraints, the
posts for the provisions will be advertised and appointed to and used to
support outreach work either within localities or as part of the central
provisions. 
(f) Property
There are no property implications arising directly from this report. 
(g) Equalities/Socio Economic Impact
Any changes in support staff will have an impact on female employees
as the majority of our support staff are female.  An Integrated Impact
Assessment has been completed and is attached as Appendix 1.  The
purpose of the ASN review has been to ensure that resource is closer to
the child with the desire to improve equality impacts for those with ASN. 
(h) Climate Change and Biodiversity Impacts
Page 105

Page 106

None. 
(i) Consultations
The Chief Financial Officer, Nicky Gosling, Accountant,  Head of HR, ICT
and OD, Quality Improvement Manager, Early Years’ Service Manager,
QIO (ASN), Principal Educational Psychologist,  HT Moray SEBN, the
Education Consultative Group, the Business Support Team Manager,
and Caroline O’Connor, Committee Services Officer, have been
consulted on this report and agree with the sections of the report relating
to their areas of responsibility. 
5. CONCLUSION 
5.1 Committee is asked to consider the work to date after a significant
change in allocations for this session and agree the recommendations
as outlined above. 
Author of Report: Vivienne Cross, Head of Education
Background Papers: The Morgan Review  
Ref:    SPMAN-1315769894-614 
Page 106

Page 107

APPENDIX 1
SPFINANCE-565096732-34   06/02/2025 10:03
INTEGRATED IMPACT ASSESSMENT COVERING 
• EQUALITIES & SOCIO ECONOMIC DUTIES
• HUMAN RIGHTS AND RIGHTS OF THE CHILD 
STAGE 1 - DO I NEED AN INTEGRATED IMPACT ASSESSMENT?   
Name of policy or proposal: 
Allocation of Pupil Support Assistant (PSA) hours to support Additional Support Needs
(ASN) in schools and early years’ settings 
Is this a  Mark X  below
New activity, programme or policy? 
Change to an existing activity, programme or policy? X
Budget proposal? X 
Duties: tick the boxes you think apply No Maybe                                                                                                                                             Yes
Equalities: Will your proposal have an impact on groups with
protected characteristics? 
Consider the impact of your proposal on people and how they
access your services and information without barriers. 
X
Socio-economic 
Not every person/family has access to regular income or
savings. Will your proposal have an adverse impact on them
x  
Does your proposal impact on the human rights of people?    X
Does your proposal impact on the rights of children and
young people 
X
Reasoning
Briefly describe your reasoning for the responses given above: 
Pupils covered by the Equality Act 2010 are supported by PSAs in schools/settings where
an assessment of need indicates that such support is required. PSA allocations have
Item 11.*
Page 107

Page 108

APPENDIX 1
SPFINANCE-565096732-34   06/02/2025 10:03
usually been reviewed each year to ensure hours are allocated appropriately, with a focus
on supporting children and young people with the highest level of need. 
If you have answered “maybe” or “yes” to any of the Stage 1 questions above
then proceed to complete the Stage 2 Integrated Impact Assessment questions
below. 
If you have answered “no” to the Stage 1 questions above then provide the details
below and submit to [email] 
Lead Officer for developing the contract  Vivienne Cross
Other people involved in the screening
(this may be council staff, partners 
or others i.e. contractor or community) 
Diane Douglas (QIO ASN), 
Rhonda Geddes-Stewart (Senior HR
Advisor), 
Date 27/1/25 
Page 108

Page 109

APPENDIX 1
SPFINANCE-565096732-34   06/02/2025 10:03 
STAGE 2: INTEGRATED IMPACT ASSESSMENT 
Brief description of the affected service
1. Describe what the service does: 
Teachers/practitioners (including ASN teachers in enhanced provisions) have a
responsibility to support all pupils in their class/setting. However, if there is an increased
level of additional support need that is assessed as requiring additional support, PSA hours
will be allocated to a school/setting.  It is the responsibility of the Head Teacher and nursery
manager to manage their allocation so that all children with additional support needs are
supported appropriately in their learning.  The school/setting will recruit PSAs to cover the
needs depending on the allocation provided to them. The PSAs are directed by the class
teacher/practitioner or ASN teacher in an Enhanced Provision, in terms of the support that
is to be provided. Most PSA hours are allocated long-term to best meet the ongoing
additional support needs contexts in schools/settings. However, changes in circumstances
regarding individual pupils or groups of peoples will mean that PSAs may be redirected to
work with different children or groups of children.  This is managed by Head Teachers.  It
is hoped that there will be less change of PSA hours over time due to the better
understanding of the additional support needs contexts in schools/settings. The allocations
provided to schools and settings last year were more robust as they were as a result of a
comprehensive moderation exercise whereby each school and setting was visited by a
group of moderators.  This was the first year that this had taken place whereby allocations
were previously based on a paper exercise.  In addition, training has been provided for staff
to support them further in fulfilling their roles. 
2. Who are your main stakeholders? 
Pupil Support Assistants, Teachers, Early Years Practitioners, Senior Leadership Teams
in schools, Nursery managers, Children and Young People with additional support needs,
Parents/Carers 
3. What changes as a result of the proposals? Is the service reduced or removed? 
The allocation to schools/settings is based on ASN Moderation of need across the
authority.  Rather than being based purely on individual children, it also looks at the
context of settings to ensure that the correct allocation is given. The Council has provided
additional monies over the past few years to maintain and add additional PSA resource
which cannot be continued and is not necessary given the evidence from the moderation
work. Last year ASN allocation was reconsidered as part of the ASN review and was
based on the level of need as well as the context of individual settings.  As a result of the
large change last year, based on more robust knowledge of need, it is anticipated that
there will be less movement of staff and moves will only happen where there has been a
Page 109

Page 110

APPENDIX 1
SPFINANCE-565096732-34   06/02/2025 10:03
significant change in need to ensure that allocations meet schools/settings ASN
requirements. 
4. How will this affect your customers? 
Parents/Carers may feel that a reduction in hours in particular schools/settings will
disadvantage their children, however support provided in a school/setting comes from a
team, that will include class teachers, ASN teachers and practitioners, and the planning
and support provided in a school should have a positive impact on pupil development,
meaning that the goal is to reduce PSA support over time.  Head Teachers and Nursery
Managers have a responsibility to manage the support provided in order to meet the
needs of pupils.  There are times where a ASN need can be overcome resulting in the
pupil requiring less support or that interventions have a great impact, and this again will
be managed by the HT and NM. 
5. Impact on staff providing the service 
PSAs are recruited on permanent or temporary contracts to cover the hours allocated.
Where there is a reduction in hours PSAs on permanent contracts may be asked to move
to alternative schools. PSAs are predominantly female so there may be a
disproportionate impact on the grounds of sex. 
School/Early Years’ staff are impacted by a reduction in PSA hours when they are used
to operating their timetables with a certain number of PSA hours in a setting, however any
reduction will reflect the needs in the settings at the time of allocation. Investment in
induction training and ongoing training for PSAs is currently planned which will ensure
staff are fully supported to undertake their roles.  Initial feedback from PSA training in in-
service days is being used to further develop this. 
6. Please indicate if these apply to any of the protected characteristics
Protected groups Potential impacts and considerations
Race  
Disability  Potential positive impact – The new PSA approach
from last year supports the inclusion of all children
and young people with needs promoting appropriate
levels of independence and achievement while
providing greater autonomy and flexibility to schools
to allocate support more appropriately to a pupil or
group of pupils.
Carers (for elderly, disabled or
minors) 
Sex Potential Negative Impact - PSAs are
predominantly female so there may be a
disproportionate impact on the grounds of sex.
Page 110

Page 111

APPENDIX 1
SPFINANCE-565096732-34   06/02/2025 10:03
Pregnancy and maternity (including
breastfeeding) 
Sexual orientation 
Age (include children, young
people, midlife and older people)
Potential positive impact – The new PSA approach
supports the inclusion of all children and young
people with needs promoting appropriate levels of
independence and achievement while providing
greater autonomy and flexibility to schools to
allocate support more appropriately to a pupil or
group of pupils.
Religion, and or belief 
Gender reassignment 
Inequalities arising from socio-
economic differences 
Human rights
List of convention rights Describe, where applicable, if and how
specific rights are engaged  
Article 5: Right to liberty and
security 
Article 6: Right to a fair trial 
Article 8: Right to respect for
private and family life,
correspondence and the home 
Article 10: Freedom of expression Those affected have a right to be consulted
and their views heard and considered
regarding the proposal to change the service.
Article 11: Freedom of assembly
and association 
Article 12: Right to marry 
Article 14: Prohibition of
discrimination (in relation to the
convention rights) 
Article 1 of Protocol 1: Protection
of property 
Article 2 of Protocol 1: Right to
education
Children with additional support needs will
receive the support they require to become as
independent as possible while also allowing
access to education.
Article 3 of Protocol 1: Right to free
elections by secret ballot 
Children’s Rights and Wellbeing 
Relevant articles – UNCRC 
Page 111

Page 112

APPENDIX 1
SPFINANCE-565096732-34   06/02/2025 10:03
Article 2 – Non discrimination
Respect rights of the child without
discrimination irrespective of disability. 
Take all appropriate measure to ensure
the child is protected from discrimination
The new PSA approach supports the
inclusion of all children and young people
with needs
Article 12 – Respect of the views of the
child 
Article 3.1 – Best interest of the child
Ensure that best interest of the child is a
primary consideration and their rights are
realised in practice.
Children with additional support needs
will receive the support they require to
become as independent as possible while
also allowing access to education.
Article 6.2 – Right to survival and
development 
7. Evidence. What information have you used to make your assessment? 
Performance data 
Internal
consultation   
x
Consultation with
affected groups
This is an ongoing part of the change management process
Local statistics x
National
statistics 
Other ASN Moderation – the in-person moderation allowed for a clear
and robust understanding of the nature of need across the
authority and showed examples of best practice when using
PSA support. This highlighted the benefits of moving away from
hours being allocated to individual pupils but rather that settings
are able to use the hours to best support their need in their own
context. This is starting to show the promotion of independence
where appropriate while allowing sufficient support for our more
complex children and young people. In addition to this there has
been a clear focus on further supporting our schools/settings to
learn from the best practice already in Moray in terms of meeting
the needs of learners as well as supporting our staff to support
pupils appropriately. 
8. Evidence gaps 
Page 112

Page 113

APPENDIX 1
SPFINANCE-565096732-34   06/02/2025 10:03
Do you need additional information in order to complete the information in the previous
questions? 
No 
9. Mitigating action 
Can the impact of the proposed policy/activity be mitigated?  Please explain 
The service described above, and the allocation process, have a positive impact on
children and young people with disability as support is provided based on an assessment
of need, with a focus on supporting those with the highest levels of need. 
Changes will be less than last year as the allocation will only change where there has
been a significant change in overall need.  When there will be a reduction in hours in a
particular setting, permanent staff are supported by HR to find alternative hours in a
setting where there is an increase in hours (redeployment). If PSAs do not want to be
redeployed there may also be the option to reduce their hours in the setting they are
working in.  Some temporary staff will retain their posts and a number of posts will be
advertised. 
10. Justification
If nothing can be done to reduce the negative impact(s) but the proposed policy/activity
must go ahead, what justification is there to continue with the change?   
The ASN Moderation last year highlighted a reliance in some settings on individual PSA
support to individual children, creating a culture of dependency and lack of independence.
While some settings utilised PSA support in creative ways, ensuring that all children and
young people were supported, other settings were only providing support to the children
in receipt of hours.  Understanding that there is a wide diversity of need across the
authority, it is important that the usage of hours is flexible within all settings to best meet
need in their own context. The new approach introduced last year has supported the
inclusion of all children and young people and promoted appropriate levels of
independence and achievement. The new approach also allowed schools/settings to be
empowered to allocate support to a pupil or group of pupils rather than to a child which is
not Best Value for the Council. 
Potential indirect discrimination of PSA staff can be justified as it serves as a
proportionate means to meet a legitimate aim in terms of the positive impact on pupils
with additional support needs. 
It is proportionate as the aim of supporting individual needs cannot be achieved by less
discriminatory means.  
Page 113

Page 114

APPENDIX 1
SPFINANCE-565096732-34   06/02/2025 10:03
SECTION 3 CONCLUDING THE IIA 
Concluding the IIA 
1. No potential negative impacts on any of the protected groups were
found. 
2. Some potential negative impacts have been identified.
The impacts relate to: 
Reducing discrimination, harassment, victimisation or other conduct
prohibited under the Equality Act 2010
X 
Promoting equality of opportunity x
Fostering good relations 
3. The proposals interfere with human rights and/or the rights of the
child
X
4. Negative impacts can be mitigated the proposals as outlined in
question 8
X
5. The negative impacts cannot be fully mitigated but are justified as
outlined in question 9. 
6. Further consultation with affected groups is needed. 
7. It is advised not to go ahead with the proposals. 
Decision
Set out the rationale for deciding whether or not to proceed with the proposed actions: 
Any negative impacts can be mitigated as outlined in section 9 above and justified as per
section 10. 
Date of Decision: 28.1.25 
Page 114

Page 115

APPENDIX 1
SPFINANCE-565096732-34   06/02/2025 10:03
Sign off and authorisation: 
Service 
Department  Education
Policy/activity subject to IIA Allocation of Pupil Support Assistant (PSA)
hours to support Additional Support Needs
(ASN) in schools and early years’ settings
We have completed the integrated impact
assessment for this policy/activity. 
Name: Diane Douglas
Position: QIO(ASN)
Date: 27.1.25
Authorisation by head of service  Name: Vivienne Cross
Position: Head of Education (Chief Education
Officer)
Date: 28.1.25
Permission to publish on website - 
Please return this form to the Equal Opportunities Officer, Chief Executive’s Office. 
Page 115

Page 116

Page 116

Page 117

REPORT TO:   EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 18 FEBRUARY 2025   
SUBJECT: EDUCATION RESOURCES AND COMMUNITIES REVENUE
BUDGET MONITORING TO 31 DECEMBER 2024 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the budget position for Education Resources and
Communities as at 31 December 2024. 
1.2 This report is submitted to Committee in terms of Section III (A) (2) of the
Council’s Scheme of Administration relating to the consideration of capital and
revenue budgets and long term financial plans. 
2. RECOMMENDATION 
2.1 It is recommended that Committee scrutinises and notes the budget
position at 31 December 2024. 
3. BACKGROUND 
3.1 The report highlights those areas of the budget where there is a significant
percentage variance identified as at 31 December 2024. 
4. BUDGET POSITION 
4.1 The spend at 31 December 2024 is £10,244,000 against a budget to date of
£10,296,000 giving an underspend of £52,000 as shown in Table 1 below.  
4.2 The underspend is mainly within Culture, Sport and Leisure Services where
there is a total underspend of £47,000 arising from £69,000 overachievement
of income and underspend of £18,000 on income offset by additional costs for
licensing, transport costs for Moray Music Centre and a small
underachievement of Libraries income. There are also small underspends in
operational budgets within learning estate and Youth Work amounting to
£27,000. 
4.3 The Public Private Partnership (PPP) budget is £6.528m.  There is a small
variance of £24,000  in budget relating to a £20,000 under achievement on
non performance deductions and a utlilties cost adjustment of £4,000. 
Item 12.*
Page 117

Page 118

Table 1 
4.4 The progress on delivering savings approved for the service is set out in Table
2 below. 
Table 2 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement 
Plan (LOIP) 
The Education Resources and Communities Revenue Budget has 
particular reference to National Outcome 8 – we have improved the life 
chances for children, young people and families at risk. 
(b)  Policy and Legal
The Council has statutory responsibilities to meet educational
needs, the needs of children and young people in need and those it
looks after. 
(c)  Financial implications
Budget Monitoring Report to 31 December 2024
Service
Revised
Budget 
Budget
to Date 
Actual to
Date 
Variance to
Date  Variance
Full Year
Forecast
Full
Year
£'000  £'000  £'000  £'000 % £'000  £'000
Communities 1,428 1,056 1,047 9 1 % 1,424 4
Culture, Sport & Leisure 4,338 3,187 3,140 47 1 % 4,316 22
Learning Estate 319 215 199 16 7 % 301 18
Business Support Unit 707 517 514 3 1 % 705 2
Education Resources & Communities Management 30 1 - 1 100 % 29 1
Public Private Partnership 6,328 5,320 5,344 (24) - 6,359 (31)
Education Resources & Communities
Efficiency Savings 128 - - - - (82) 210
-
Education Resources &
Communities Total 13,278 10,296 10,244 52 - 13,052 226
Education Resources and Communities 2024-25 Savings
Approved Achieved Reason for
Saving Saving Non Achievement
£000 £000
Business Admin remove 4 posts 55 111
Saving was to be over 2 years but due
to vacancies the full saving has been
taken in 24/25
Primary School FM - Delete PAT testing post and contract out 27 27
Sport and Culture - Replace mobile library with redesigned service 20 20
Sport and Culture - Remove Health and Wellbeing Officer post 51 51
Communities Team - Remove 1 Outdoor Learning post 59 59
Communities Team - Remove 1.75fte from the  Community Support Unit
88 88
Saving started August 2024. Balance
of saving will be made in 25/26
Communities Team - Reduce community capacity training budget
4 4
Saving started July 2024. Balance of
saving will be made in 25/26
Elgin Community Centre closure - VER
163 123
Balance of saving will be achieved
when building sold
Library contract management systems 7 7
Relocate staff from Auchernack and Forres Community Centre staff restructure 20 23
Page 118

Page 119

The resource implications are set out in this report and at Table 1. The
underspend at 31 December 2024 is £52,000 against a budget to date
of £10,296,000. The estimated year end position is expenditure of
£13,052,000 against the budget of £13,278,000 resulting in an
underspend of £226,000, which arises mainly due to vacancies and
appointments of staff lower in the salary scale in addition to the other
points noted in this report. 
(d)  Risk implications
Budget Managers are aware of their responsibilities for managing
budget allocations and approval for any variances will be sought from
Committee in line with the Financial Regulations. 
(e)  Staffing implications
There are no staffing implications associated with this report. 
(f)  Property
There are no property implications associated with this report. 
(g)  Equalities/Socio Economic Impact
An Equality Impact Assessment is not needed because the report is to
inform the Committee on budget monitoring. 
(h)  Climate Change and Biodiversity Impacts
No climate change and biodiversity impacts arise directly from this
report. 
(i) Consultations
Chief Financial Officer and the Caroline O’Connor, Committee Services
Officer have been consulted and are in agreement with the contents of
this report where it relates to their areas of responsibility. 
6. CONCLUSION 
6.1 That Committee scrutinises and notes the budget position as at 31
December 2024. 
Author of Report: Denise Whitworth, DCE (ECOD) 
Nicky Gosling, Accountant
Background Papers: with authors 
Ref:    SPMAN-1315769894-490 / SPMAN-9425411-320
Page 119

Page 120

Page 120

Page 121

REPORT TO: EDUCATION, CHILDRENS AND LEISURE SERVICES
COMMITTEE ON 18 FEBRUARY 2025 
SUBJECT: EDUCATION RESOURCES AND COMMUNITIES AND
EDUCATION CAPITAL BUDGET MONITORING REPORT TO 31
DECEMBER 2024 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT 
1. REASON FOR REPORT 
1.1  To inform Committee of the capital budget position for Education Resources
and Communities and Education as at 31 December 2024. 
1.2  This report is submitted to Committee in terms of Section III (A) (2) of the
Council's Scheme of Administration relating to the consideration of Capital
and Revenue budgets and long-term financial plans. 
2. RECOMMENDATION 
2.1  It is recommended that the Committee scrutinises and notes the capital
budget position as at 31 December 2024. 
3. BACKGROUND 
3.1 It is the practise of this Committee to receive regular reports providing an
update on the current financial position of the Education Resources and
Communities and Education Capital Budget programmes. 
3.2 At the meeting of Moray Council on 24 January 2024, the Capital Plan for
2024/25 was approved (para 11 of minute refers). At the meeting of Moray
Council on 26 June 2024 (para 13 of minute refers), carry forward for capital
budget within Education Resources and Communities and Education was
approved. 
3.3 This report highlights those areas of the capital budget relating to Education
Resources and Communities and Education budgets where there is a
significant percentage variance as at 31 December, or the risk of variance
over the course of the financial year (highlighted as red or amber in the
budget update at Appendix 1). 
Item 13.*
Page 121

Page 122

3.4 The report also provides a narrative update on major ongoing projects. 
3.5 The capital budget expenditures for the Education Resources and
Communities and Education Services are listed in Appendix 1. 
4. BUDGET POSITION 
4.1 The total approved capital budget for Education Resources and Communities
and Education for financial year 2024/25, including carry forwards from
2023/24 and amendments in the year, is: 
2024/25
£000
Land and Buildings 15038
Vehicles Plant and Equipment 263
Total 15,301 
4.2 The actual expenditure up to 31 December 2024 was £3,107,000 
4.3 Current variance (or risk of variance) in the Capital Plan relate to the following: 
Schools Essential Maintenance / BB Upgrade Programme 2024/25
4.4 The planned expenditure on school B/B condition and suitability upgrade,
building element replacement and compliance works for 2024/25 is 2 lines
within the Capital Plan which totalled £6m.  The first line is made up of a £5m
budget for actual upgrade works, and the second line a £1m budget for
preparatory works (detail design, planning and tendering) for building works
planned to go ahead over the next two financial years – supporting a 3 year
project delivery timeline for these works. This approach was established to
support the design and build project stages and associated project budgets
that extend over one or more financial years. 
4.5 The current in year budget for each individual project is detailed in Appendix 1
for budget monitoring purposes. The majority of the programme is phased
work which seeks to address school fabric and components, as defined in the
Scottish Government’s Condition Core Fact guidance, graded as Condition D
with the possibility of full or partial failure or works to ensure building
standards or other statutory compliance. 
4.6 It was reported in the Quarter 2 monitoring report that there would be a likely
underspend of ‘preparatory’ design budget (Appendix 1 – Line 39). The
transition from a ‘make-do-and-mend’ asset management approach to school
buildings over the last 12 months, a methodology in place for almost a decade
has resulted in a significant decline in the condition and suitability of buildings
across the Learning Estate. Coupled with the absence of recent core condition
building reports required to inform asset improvement planning this has
resulted in a significantly more challenging task to develop a prioritised list for
works and undertake the task to complete project design packages for
competitive tender than was envisaged at the start of this financial year.
Page 122

Page 123

Consequently, the majority of upgrade projects planned for this financial year
are either in an earlier stage of design than planned or not yet started. This
has resulted in forecast underspend of the BB design allowance budget of
£658,000 allocated for this year. Given the capital plan affordability pressures
over the next 3 years there will be no request for carry forward of this
underspend. 
4.7 An annual budget of £200k was assigned to the support the recruitment of an
Asset Manager to support both the BB upgrade programme and develop
related asset management plans for all the school builds over this and the
next 2 years. The recruitment to this post has been difficult with no suitable
candidates to date. Thomas and Adamson have provided some consultancy
service to assist in development some of the asset management plans
accounting for £50k of the budget. The budget is an agreed in year spend so
the remaining £150k will not be carried forward. Further efforts to recruit for
next year continue. 
4.8 The Cullen Primary School B Condition/Enerphit upgrade design and
subsequent tender process has taken longer than was planned. A significant
project reprofiling has been undertaken and a request to Council to carry
forward a budget of £546,000 into financial year 2025/26 as part project
reprofiling. A significant element of this carried forward is a part of the SALIX
grant award for this pilot project totalling £593,888. 
4.9 The Mortlach Primary School BB upgrade design process has been complex
and taken longer than was initially planned. A phased project over next 2
years is needed to deliver significant building update and component
replacement works and the completion of the design works requires a carry
forward of £79,000 into financial year 2025/26. 
4.10 The Milnes High School and Speyside High School replacement doors and
windows project was delayed as original tenders returns were significantly
higher than expected and project directed to look to reduce project cost by
reducing time on site. Further engagement with both schools, to see if more
classrooms could be made available over a shorter period of time using a
more aggressive decanting plan (which saved in the region of £300k project
costs).  A reprofiling of these projects will see work complete in late 2025 and
a request to carry forward £1.099m into financial year 2025/26. 
4.11 The Bishopmill PS replacement sports floor project had to tender twice for this
project and was therefore not able to undertake works during October 2024
school holidays. The next opportunity to complete this work will be spring
school holidays in April 2025 and it will require a budget carry forward of
£100,000 into financial year 2025/26. 
4.12 Milnes High School roof project was completed on time with an underspend of
£19,000 of unspent risk contingency. 
4.13 A failure of the Speyside High School back up heating system required an
urgent system upgrade to avoid the risk of school closures over the winter and
to be compliant with current building technical standards at a cost of £95,000
Page 123

Page 124

which has been funded from programme contingency. This work has been
completed to time and cost. 
4.14 East End Primary School phased programme to compete the render
replacement will now extend into the 2025 requiring a carry forward of the
remaining £175,000 budget into financial year 2025/26 to complete the
project. The project slippage was due to workload issues across the design
and construction team that were not noted in time to recover the delay. Project
monitoring has been improved to support early identification and mitigate
potential risks and issues project timelines 
4.15 The Knockando Primary School Horsa hut project was originally set to only
replace the roof on the gym building to remove an asbestos risk. Due to a
similar asbestos risk with the dining block roof, the project scope was
increased to also replace this roof at an additional £22,000 cost. 
4.16 Keith Grammar fire alarm upgrade project work was originally costed and
expected to complete in 2023. With the need for wide access to the building,
that could only be accommodated during the 2024 summer school holidays,
the project was delayed significantly, and market costs increased the total
project by £10,000. 
4.17 The drainage upgrades at East End and Millbank primary schools are
complete and the upgrade at Seafield Primary Schools is near completion with
an overall project underspend of £418,000. As reported in the Q2 report to
Committee in November 2024 a review of the significant discrepancy between
estimated and actual identified a significant early risk allowance applied to the
project due to uncertainty over below ground conditions. Although the risk was
reduced early in the project this was not corrected in the capital plan. The
asset management working group have noted this and have improved the
process for reporting change. 
4.18 The drainage upgrade costs at Aberlour Primary School have increased by
£38,000 due to the additional works needed to reinstatement the existing
Additional Support Needs (ASN) playground area and this was unable to
completed during term time and the work has rescheduled to complete during
the spring holiday in April 2025 and will require a carry forward a budget of
£64,000.   
4.19 The drainage upgrade costs at Aberlour Primary School have increased by
£38,000 due to the additional works needed to reinstatement the existing
Additional Support Needs (ASN) playground area and this was unable to
completed during term time and the work has rescheduled to complete during
the spring holiday in April 2025 and will require a carry forward a budget of
£64,000.   
4.20 The New Elgin Primary School water and heating pipework project was
originally estimated to cost £401,000 but following tender the contract ward
was for £325,000 which included a significant contingency budget assigned to
cover complexity risk. The works was much easier to compete with a resultant
underspend of the risk allowance of £108,000. 
Page 124

Page 125

Forres Academy – Reinforced Autoclaved Aerated Concrete Mitigation 
4.21 Although significant work was undertaken last financial year to mitigate the
finding of reinforced autoclaved aerated concrete across Forres Academy an
additional £245,000 was budgeted to cover known additional works (fire door
replacement to meet a changed building fire strategy) and a risk allowance for
any further issues arising from the monitoring survey cycles. Further high risk
issues were identified in the kitchen and technical teaching block and
mitigation work completed last year. To date the cost of works has been
£199,000 leaving a contingency of £46,000 for any further risk mitigation. If
any or all of this remaining contingency is not allocated in Q4 there will be a
request to carry this forward into financial year 2025/26. 
Elgin High School Capacity Extension
4.22 The Q2 Capital Monitoring Report stated that although a capital budget of
£2,415,000 had been allocated for financial year 2024/25 a delay in
establishing the legal ‘carve’ out of land from the existing school red line
boundary as defined by the Design Build Finance Maintain (DBFM) legal
framework had resulted in a budget re-profiling of £1,755,000 into the financial
year 2025/26 with revised cashflow forecasts and a revised operational
handover of the new school building to December 2026. 
4.23 The decision to pause the project for up to 12 months at the conclusion of
concept design phase in January 2025, to allow a reassessment of the future
school capacity requirements, will see the spend for this financial year reduce
to £416,000 and a further profiling of spend across 2025/26 and 26/27
financial years. 
Future Forres Academy
4.24 The Future Forres Academy project is currently at Hub Stage 1/RIBA Stage 2
Concept Design which is now due to complete at the end of April this year. 
4.25 The 2024/25 capital plan has £2,381,000 allocated to the project; however, as
reported in the Q2 monitoring report, the 4-month delay has resulted in a
change to cashflow forecasts and a reduction in planned spend of £1.186m
for this financial year and reprofiling of the overall project capital budget over
the next 3 years. 
Future Buckie High School
4.26 The Future Buckie High School project was not successful in its bid to be a
LEIP Phase 3 project. The current project plan seeks to deliver the future
school in 2029/2030 timeframe. The Q2 capital monitoring report to ECLS
Committee in November 2024 stated a report into future options would be
submitted to this Committee in February 2025. However, with the significant
reduction of capital £32.319m agreed to the 3 year capital budget across the
whole Learning Estate delivery programme agreed at Council on 21 January
2025 (para 7 of minute refers), to ensure that Council capital borrowing
remains within agreed threshold caps, the existing refurbishment options are
not affordable and further work has been commissioned to determine further
cost reductions options and an assured timeframe for delivery which will
consider, and be dependent on, wider investment decisions across the
Learning Estate. A detailed report on the project is planned to be submitted to
this Committee on 13 May 2025.
Page 125

Page 126

Universal Free School Meals
4.27 On 7 November 2022, a Scottish Government capital funding allocation of
£598,000 was paid as part of the General Capital Grant on 15 December
2022. Further capital grant funding allocations of £19,142 and £92,000 were
paid in March 2024 and October 2024 respectively to support the phased
expansion of free school meals to those in receipt of Scottish Child Payments.
To date only £10,000 has been allocated to new equipment provision and
some early design work on the reinstatement of two production kitchens to
meet additional future demand with an expansion of free school meals to all
primary school children.   
4.28 The Scottish Government has indicated it will not look to roll out to the
remaining P6-P7 cohort during this administration. It is therefore only planned
to spend £40,000 of the budget during this financial year 2024/25 to support
further equipment procurement for kitchens and to increase capacity in dining
areas across a number of primary schools. A carry forward of the remaining
£653,000 grant budget to financial year 2025/26 is recommended to support
P6-P7 roll out capacity expansion over the next 2 years. 
4.29 A specific update report on the Universal Free School project is planned to be
submitted to this Committee on 13 May 2025. 
Early Learning and Childcare
4.30 This is a “spend to save” option which is being considered as part of the wider
Council savings to ensure Elgin Academy Associated School Group (ASG)
has sufficient capacity for demand of funded 3 and 4 year olds. Care
Inspectorate toilet and nappy changing guidance deems that additional toilets
and change spaces will be required to increase capacity at Seafield Nursery
from 40 to 56 children. 
Libraries and Leisure
4.31 Land & Buildings (L&B)
Libraries and Leisure capital project spend on land and buildings to the end of
Q3 was £32,000. All identified projects are progressing as planned and within
timescales, in the main repair works at Elgin Library.  The £1,353,000
refurbishment and upgrade of swimming pools will not be progressed until the
future direction for the Leisure Estate is determined. As such the full balance
has been removed from the 2024/25 Capital Plan and will be made available
when further decision on the Leisure Estate are agreed. The £700,000
allocation against Moray Leisure Centre is contingency in regards to any
potential asset failure which would result in facility closure, any underspend
will be requested as a carry forward.  The new 3G pitch allocation of £592,000
will not be utilised until the Forres Academy development progresses and a
there is a request to carry forward this.  
4.32 Vehicle, Plant & Equipment (VPE)
Spend to date on VPE was £130,000. All identified projects are progressing
as planned to improve the operational matters of our leisure facilities including
support for plant repairs to Moray Leisure Centre. 
5. SUMMARY OF IMPLICATIONS 
Page 126

Page 127

(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) 
The capital projects referred to in this report support the delivery of the
LOIP outcome of building a better future for our children and young
people in Moray and developing, diverse and sustainable economy, and
are advancing the Corporate Plan priority of building thriving, resilient,
empowered communities in terms of managing the financial and
resourcing pressures of our learning estate. 
(b) Policy and Legal 
The Council has statutory responsibilities to meet educational needs, the
needs of children and young people in need and those it looks after. 
(c) Financial implications 
The financial implications are set out in this report and at Appendix 1.
Budget managers are aware of their responsibilities for managing budget
allocation and approval for any unavoidable variance will be sought from
the Council in line with the financial regulations. 
The capital plan approved by Council on 21 January 2025 detailed the
outcome of the annual 10-year capital plan review and the council
approved overall Council capital spend of £86m over the next 3 years,
which included a £32.4m reduction impacting the Learning Estate
programme planned budget named and core projects. 
It is acknowledged that given the requirement to set an affordable 
capital spend across Council services and ensure compliance with
prudential borrowing rules, there will be no increases to the 3 year
capital budget.  However, there are significant strategic and operational
risks associated with this that will impact the existing learning estate
delivery strategy that should be fully understood and managed and
communicated carefully due to the associated political and reputational
risk implications. 
Further significant capital investment in the BB Condition/Suitability
upgrade projects would be required to improve the condition of schools
for a further 15 years (out to 2039). In applying that focus to the Learning
Estate the asset standard (condition and suitability) for schools is
mandated as a B (satisfactory) minimum. In addition, if there is a
reduction in planned upgrade works there is a risk the assets will
continue to deteriorate, and the risk likelihood of building failure will
increase. The realistic options for the Learning Estate are therefore to
reduce assets or lengthen programmes of work. The BB upgrade
programme plan has now been extended from 10 to 15 years. 
In regards to Leisure and Libraries, significant refurbishment and
upgrade of facilities has not progressed this year as the future of both
these Estates are yet to be determined.  This has resulted in these
assets continuing to deteriorate which places greater pressure on the
Properties service repairs and maintenance budget. 
(d)  Risk Implications 
Page 127

Page 128

The school estate (excluding new build) continues to deteriorate with
now 32 out of the 53 schools reported as C (Poor) condition and a
further 2 as D (Bad) condition. Without the level of investment reported in
para 4.3 and managing the affordability factors outlined in para 5 (c) the
risk of building failures, temporary closures and/or health and safety
continue to be a concern.   
The leisure and libraries estate continues to deteriorate with 50%
reported as C (poor) condition.  With the level of investment required
outweighing available budget the risk of building failures, temporary
closures and/or health and safety continue to be a concern.  
(e)  Staffing Implications 
There are no staffing implications arising directly from this report. 
(f)  Property 
There are no property implications other than those detailed in the
report. 
(g) Equalities/Socio Economic Impact 
There are no equalities or socio-economic implications associated with
this report. 
(h)  Climate Change and Biodiversity Impacts 
A number of detailed technical surveys have been completed to support
EnerPHit (Passivhaus standard to achieve a high level of building
thermal performance) informed retrofit based investment decisions
focused on the value for money impact of fabric and heating/power
improvements across a selection of school architectural types. These
have already informed BB upgrade design options for projects, notably
Cullen Primary School (which benefits from SALIX grant funding).     
All BB upgrade projects will consider the EnerPHit Informed Retrofit
approach to support design options to increase energy efficient and
reduce carbon emissions of school buildings. 
All new build schools will seek to reduce embodied carbon in design and
to be operationally net zero through the adoption of an energy efficient
building design together with non-fossil fuel heat and power sources. 
(i)  Consultations 
The Senior Accountant, Property Asset Manager, Design and
Construction Manager, Programme Manager (Learning Estate), Early
Year’s Service Manager, Sports and Culture Service Manager, Legal
Services Manager, Strategy and Performance Manager and Caroline
O’Connor, Committee Services Officer have all been consulted and the
comments received have been incorporated into the report. 
6. CONCLUSION 
6.1 This report presents the Education Resources and Communities and
Education Capital budget position to 31 December 2024. It highlights
Page 128

Page 129

and provides detail on any variances and provides an update to
Committee on agreed named major projects. 
Author of Report:   Andrew Hall, Programme Manager (Learning Estate)   
Background Papers:    
Ref:   SPMAN-942411-492 
Page 129

Page 130

Page 130

Page 131

Current Capital Plan
2024/25
£000
Actual
Expenditure to 31
Dec 2024
£000
Total Projected
Expenditure
FY 24/25
£000
Q3 Projected
Variance
£000 RAG Status
LANDS AND BUILDINGS
Learning Estate
B for condition and B for suitability
Asset Management Plans- Asset Manager 200 0 50 150 A
Alves - Sustainability Feasibility Study 2 20 27 -25 A
Mosstodloch - Sustainability Feasibility Study 2 1 2 0 G
Mosstodloch Primary School -- Flat roof replacement 5 2 5 0 G
Bishopmill Primary -- Replace sports hall flooring 100 0 0 100 A
Buckie High School -- Replacement roof feasibility design 2 1 2 0 G
Buckie High School -- Security door and access upgrade 206 195 220 -14 G
East End Primary School -- Doors, Window and Render Replacement 118 103 103 15 G
East End Primary School -- Render and Window replacement 194 0 6 188 A
Keith Grammar - Fire alarm upgrade. 78 59 62 16 G
Bishop Primary- Design work for replace / demolish Horsa Hut 23 23 23 0 G
Knockando Primary -- Design work for replace / demolish Horsa Hut 48 1 70 -22 A
Mortlach - B Upgrade 100 1 21 79 A
New Elgin Primary School - Water and heating pipework 325 142 217 108 A
Forres Academy -- Upgrade Pupil Toilets 181 173 194 -13 G
Cullen Primary School - BB/Enerfit Upgrade Design 750 105 204 546 A
Kinloss Primary School - BB/Enerfit Upgrade Design 50 16 34 16
Burghead Primary School - BB/Enerfit Upgrade Design 50 19 19 31
Pilmuir Primary School - BB/Enerphit Upgrade Design 50 37 37 13
Dyke Primary School - BB/Enerphit Upgrade Design 20 0 5 15
West End Primary School - BB/Enerphit Upgrade Design 0 19 19 -19
Rothes Primary School - BB upgrade design 0 0 3 3
Speyside HS - Replace doors and windows 825 7 12 813 A
Milnes HS - Replace doors and windows 295 6 9 286 A
Milnes HS - Roof 110 120 91 19 A
Aberlour PS - Drainage 68 4 4 64 A
East End Primary School - Drainage 257 0 110 147 A
Millbank Primary School - Drainage 295 116 115 180 A
Seafield Primary School - Drainage 145 105 54 91 A
Speyside HS - Backup heating system upgrade 0 95 95 -95 A
G
Forres Academy-RAAC
Forres Academy -- Fire Door Replacement 100 75 75 25 A
Forres Academy -- Kitchen intervention 100 88 88 12 A
Forres Academy -- (Contingency) T19 intervention 45 0 36 9 A
APPENDIX 1
Item 13.*
Page 131

Page 132

BB design allowance (FY25/26 works)  1,000 197 342 658 A
BB Contingency 208 99 99 109 A
BALANCE 5,952 1,532 2012 3505
Compliance Requirements
Legionella works - Schools 16 6 16 0 G
Schools -Fire, Safety and Security - Minor Works 200 119 200 0 G
Schools Accessibility 46 23 46 0 G
BALANCE 262 262 0
Major Refurbishment and Rebuild
Elgin High School Modular Units 8 7 8 0 G
Elgin High School Extension 2,415 416 416 1999 A
Forres Academy  2,381 993 1186 1195 A
Future Buckie High School 38 38 38 0 G
Elgin South Primary Capacity Management 50 0 25 25 G
BALANCE 4,892 1,454 1,673 3,219
Scottish Gov Funded Projects
CO2 Monitors / Ventilation 86 1 7 79 G
Universal Free School Meals 693 10 40 653 G
BALANCE 779 11 47 732
Learning Estate BALANCE 11,885 2,997 3,994 7,456
Libraries and Leisure
Resurface & rejuvenate 3G pitches in Moray 253 5 0 253 G
New 3G Pitches 592 0 0 592 R
Refurbishment & upgrade of pools 1353 0 0 1,353 R
Libraries refurbishment 139 32 32 107 A
Moray Leisure Centre 700 0 0 700 R
Libraries and Leisure BALANCE 3037 37 32 3,005
ELC Settings
Cullen Nursery 10 11 12 -2 G
Portgordon Nursery 84 31 28 56 A
Kinloss Nursery 0 1 0 0 G
Pilmiur Nursery 10 12 13 -3 G
Aberlour Nursery 12 11 24 -12 G
Portessie Nursery 0 7 7 -7 G
ELC BALANCE 116 73 84 32
ERC TOTAL 15,038 3,107 4,110 10,493
VEHICLES PLANT AND EQUIPMENT
Libraries and Leisure 94 8 30 30 A
Page 132

Page 133

Moray Leisure Centre 169 119 119 0 G
TOTAL 263 127 149 30
Page 133

Page 134

Page 134

Page 135

REPORT TO: EDUCATION, CHILDRENS AND LEISURE SERVICES
COMMITTEE ON 18 FEBRUARY 2025 
SUBJECT: LEARNING ESTATE WORKING GROUP 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT 
1. REASON FOR REPORT 
1.1 To inform the Committee of the progress made by the Learning Estate
Working Group and its recommendations to Committee. 
1.2 This report is submitted to Committee in terms of Section III (D) (1) of the
Council's Scheme of Administration relating to all the functions of the Council
as an Education Authority. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee:- 
(i) notes the progress made by the Learning Estate Working Group; 
and 
(ii) agrees to proceed without acceleration of the planned approach to
the Learning Estate Strategy and to review the policies associated
with the future learning estate work as set out in the report. 
3. BACKGROUND 
3.1 The Education Children’s and Leisure Services (ECLS) Committee on 17
September 2024 (para 8 of minute refers) agreed to establish a Short Life
Working Group to consider the strategic issues surrounding the learning
estate and to consider the development of learning estate rationalisation
which would report back to the ECLS Committee. 
3.2 This followed on from discussion at the 21 August 2024 members workshop
and the actions identified in the latest Best Value report and reports by
external advisers. 
Item 14.*
Page 135

Page 136

3.3 Following discussion, the Working Group agreed to work to the terms of
reference set out in Appendix 1 to carry out the remit given to them by
Committee. 
3.4 The Working Group met on four occasions and considered a range of
statistical information and data regarding individual schools on an Associated
School Group (ASG) by ASG basis.  The Group considered this information in
the context of the Learning Estate Strategy and the Council’s revenue budget
position which was developing over the period of time that the Group met.   
3.5 The Learning Estate Strategy was approved by Moray Council on 16
December 2020 (para 5 of minute refers) and updated on 28 September 2022
(para 15 of minute refers) and sets out the Council’s vision of providing a
sustainable education service aiming for excellence.  It is based on the
occupancy, condition and suitability of our schools being more efficient and a
fit-for-purpose school estate for communities across Moray.  The Strategy is
being progressed through a staged programme of ASG by ASG engagement
that is due for completion by June and planned to be reported to this
Committee in September 2025. 
3.6  The key questions for the Group were whether the work on the Learning
Estate Strategy should continue as is or whether it should be accelerated to
bring earlier benefits to aid the Council’s budget position and if so, how should
that programme of work be designed. 
3.7  Having identified and considered a number of possible options, the Working
Group was mindful that the revenue budget position of the Council was the
main driver for considering acceleration.  However, the Group also noted that
the planned Learning Estate Strategy is a vital contributor to the medium term
revenue and capital positions and its success is essential to ensuring a sound
foundation for the future learning estate and so gave priority to ensuring future
change is not inhibited by any accelerated work. 
3.8 The potential impact of short term data was a further consideration and the
Group identified the importance of planning based on known and predictable
facts rather than changeable, subjective issues was identified to build into
future work. 
3.9 Taking account of all of the issues and the developing revenue budget
position, the Group decided to recommend that acceleration of the planned
work does not go forward but that the following actions be progressed: 
1. Develop the policy foundation for future change: 
a. Mothballing policy including consideration of an “in zone” approach
(May 2025 ECLS committee)
b. Placing Requests policy – to be reviewed to ensure alignment of
purpose 
2.  Apply updated policy position to opportunities from August 2025 term
onwards 
Page 136

Page 137

3 Progress the Learning Estate Strategy as planned and bring report to
this Committee in September 2025. 
3.10 The Working Group was satisfied that the remit from ECLS had been
discharged and that the Group could be brought to a close.  However, at the
point at which the planned Learning Estate Strategy would benefit from
informal political input, it was suggested that a member working group be re-
convened. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The Learning Estate Strategy supports the priorities in the corporate
plan. There are no specific implications from this report. 
(b) Policy and Legal
A number of policy issues have been identified as set out in the report. In
some cases this will lead to further legal considerations and these will be
addressed in the reports that come to committee on these policy areas. 
(c) Financial implications
There are no direct financial implications from this report 
(d) Risk Implications
There are considerable risks to continuity of education associated with
the condition of the learning estate.  Maintaining the current estate at an
acceptable standard and condition is unaffordable in the context of the
council’s budget and requires consideration of a future planned
approach.  These are risks that will be addressed through the work
planned on the Learning Estate Strategy. 
There is a risk that acceleration could jeopardise the Learning Estate
Strategy and that has been a key consideration leading to the position
recommended by the Working Group. 
(e) Staffing Implications
There are no direct staff implications from this report. 
(f) Property
The Learning Estate Strategy aims to secure the long term future of the
learning estate to support the delivery of education in Moray.  However,
there are no property implications from the recommendations in this
report. 
(g) Equalities/Socio Economic Impact
There are no direct impacts from this report.  Considerations will be built
into the future planned learning estate work. 
(h) Climate Change and Biodiversity Impacts
There are no direct impacts from this report.  Climate and environmental
considerations will be built into the future planned learning estate work.
Page 137

Page 138

(i) Consultations
The Chair and Vice Chair of ECLS Committee, Head of Education and
Learning Estate Programme Manager have been consulted on the report
and feedback incorporated. 
5. CONCLUSION 
5.1 The Learning Estate Working Group has concluded a series of meetings
where members reviewed information on the learning estate and
considered this is the context of potential acceleration of the Learning
Estate Strategy to bring forward the benefits of the work.  The Group has
concluded to recommend progress the Strategy as planned with a report
to this Committee later this year and to progress policy work that would
support this.  The Working Group is satisfied that is has discharged the
remit from ECLS Committee and can be concluded. 
Author of Report:  Denise Whitworth 
Background Papers: 
Ref:    SPMAN-9425411-496 
Page 138

Page 139

APPENDIX 1     
SHORT LIFE WORKING GROUP: LEARNING ESTATE 
TERMS OF REFERENCE/REMIT 
1. BACKGROUND
1.1 ECLS Committee 17 September 2024 agreed to establish a Life Working
Group to consider the strategic issues surrounding the learning estate and to
consider the development of learning estate rationalisation which would report
back to the ECLS Committee.
1.2 This follows on from discussion at the 21 August 2024 members workshop
and the actions identified in the latest Best Value report and reports by
external advisers 
2.  REMIT AND PURPOSE OF THE GROUP
2.1 The Primary objective of the group is to identify options to accelerate the
rationalisation of the learning estate over the next 18 months or so to bring
educational and financial advantage.
2.2  Aim is to develop a short term, realistic plan for acceleration of rationalisation
of learning estate that is consistent with the long term objectives of the
Council’s Learning estate strategy.
3. TERMS OF REFERENCE OF THE GROUP
3.1  To review and consider the data associated with the learning estate to ensure
that elected members have a full understanding in order to inform the
development of a programme of rationalisation associated with the Learning
Estate Strategy.
3.2 Consider the specification of the project to rationalise the learning estate as
set out in the Project Mandate.
Item 14.*
Page 139

Page 140

APPENDIX 1
3.3  To consider principles that could be recommended to the council to further
guide the implementation of the Learning Estate Strategy in the context of the
constrained financial situation and the unaffordability of the capital plan.
3.4 To discuss, consider and identify options for a programme of learning estate
rationalisation.
3.5 To consider and plan for medium term work related to the learning estate
strategy at the appropriate time, including issues relating to policies and
workforce. 
4. Outcomes:
4.1 Learning estate rationalisation programme that can be recommended to the
council in order to ensure sustainable, quality and affordable schools for the
future delivery of education in Moray.
4.2 Member awareness of the longer term work planned on the agreed learning
estate strategy in order to inform future planning. 
5. Membership of the Working Group:
2 Conservative, 2 SNP, 1 Labour, 2 Independent/non aligned
Page 140

Page 141

REPORT TO: EDUCATION, CHILDREN’S AND LESIURE SERVICES
COMMITTEE ON 18 FEBRUARY 2025 
SUBJECT: EDUCATION DIGITAL INFRASTRUCTURE READINESS UPDATE 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of progress on development of the schools ICT
infrastructure to ensure readiness for digital development. 
1.2 This report is submitted to Committee in terms of Section III (D) 1 of the
Council's Scheme of Administration relating to exercising all the functions of
the Council as an Education Authority. 
2. RECOMMENDATION 
2.1 It is recommended that Committee: 
(i) consider and note the progress on the procurement and
implementation of the Mobile Device Management (MDM) system,
and that the expected completion date of the project is now 30 April
2025; 
(ii) note that the licensing model for the MDM system has changed to a
perpetual based model, meaning that the total project cost is
contained within the year 1 allocation, with no recurring costs
thereafter, other than licences for additional devices; 
(iii) note the update on the Scottish Wide Area Network (SWAN)
programme; and 
(iv) note that a further progress report will be brought forward to this
Committee in September 2025. 
3. BACKGROUND 
3.1 On 14 December 2022 an Outline Business Case was presented for
consideration to this Committee outlining 3 options for the development of
digital inclusion in Moray’s schools (para 9 of minute refers).   It was agreed to
Item 15.*
Page 141

Page 142

focus on preparing and developing the ICT infrastructure to ensure readiness
for digital development.   Leading on from this, a further report submitted to
this Committee on 19 September 2023 highlighted connectivity issues and
specifically the detrimental impact of the increased use of iPads on the
performance of the schools’ ICT network (para 11 of minute refers). 
Mobile Device Management (MDM) Update
3.2 The report highlighted that the implementation of a MDM would contribute
towards addressing the wider performance issues by ensuring that the
bandwidth available is efficiently used.  The procurement of an MDM system
was approved by Committee, with indicative costs of between £18,000 to
£24,000 in Year 1 followed by recurring costs of between £8,000 to £9,000. 
3.3 The procurement process and ensuing commercial discussions highlighted an
alternative licensing model to the annual subscription model on which the
indicative costs in the previous Committee report were predicated i.e. a
perpetual licence model, whereby the cost is incurred up front, with no
recurring annual costs.   
3.4 Furthermore, the professional services and training elements were more
modest than anticipated.   Consequently, the total contract value of £24,500 is
very close to the year 1 total previously reported, with no further recurring
costs for the current device estate. 
3.5 There are two phases to the implementation: 
• Phase 1 – configure iPads to allow Internet access
• Phase 2 – configure iPads to allow full management of the iPads and apps 
The phases were designed to run in parallel, with phase1 offering a quick
method to get iPads online with the new system, as this was flagged as a
priority. 
3.6 Phase 1 commenced at the end of October 2024.  Prior to commencing
Phase 2, a pilot was undertaken for a small number of schools; Buckie High
School, Lossiemouth High School, and Millbank Primary School.  The
objective of the pilot was to test the fully supervised enrolment, which enables
the management of the iPads, as well as the provision and update of the
apps.  The pilot proved successful, and the enrolment of iPads in the
remaining schools began in November 2024. 
3.7 The original target for completion of both phases was December 2024 based
on metrics from the supplier.  However, this has proven to be overly optimistic,
with progress sitting at 63% for iPads that are enabled for Internet access,
and 15% for iPads that are fully managed. 
3.8 The main reason for this is that it has been challenging and time-consuming to
get older devices updated to a level where they can access the system.  This
has been exacerbated by the long-standing capacity issues on the central
Internet link for the schools. 
Page 142

Page 143

3.9 Following protracted discussions with the supplier of the schools’ Internet link,
Capita Business Services Limited (Capita), it was agreed on 17 January 2025
to increase the capacity of the central Internet link.  Early indications are that
this has had a positive impact in the schools, albeit there are still performance
issues at the start of the school day, and a number of residual connectivity
issues to address and ICT continue to work with individual schools on these. 
3.10 In terms of the MDM, it is estimated that the project will now be completed by
the end of April 2025, which will allow for an assessment of the impact of the
MDM system on network performance.  It is proposed to provide a further
progress report to this Committee in September 2025. 
Network Connectivity Update
3.11 In terms of improved network connectivity, this will be significantly addressed
by the next iteration of the Scottish Wide Area Network (SWAN) framework. 
Connectivity in schools is currently provided via the initial SWAN framework,
which is managed by Capita.  The Council’s call-off contract with Capita
comes to an end in March 2026, and there has been no scope to increase
bandwidth in schools since 31 March 2023. 
3.12 The SWAN framework was retendered and awarded to British
Telecommunications plc (BT) in April 2023.  The Council has entered into a
call-off contract with BT, and the transition to the new SWAN framework will
be in three phases: 
• Phase 1 – secondary schools and a small number of corporate sites
(identified as part of the Smarter Working project)
• Phase 2 – primary schools and Data Centre links
• Phase 3 – remainder of corporate sites 
3.13 Work on phase 1 commenced in September 2024 and new circuits have been
installed in all secondary schools; transition to the BT network is expected to
take place late March / early April 2025.  Work to analyse fibre availability for
Phase 2 is progressing with BT, and this work is expected to be completed by
the middle of February 2025.   
3.14 Further detailed updates on the progress and impact of the new SWAN
framework will be included in the report referred to in para 3.10 above. 
3.15 On 16 December 2024 concerns regarding the digital connectivity issues
within Moray and the consequent impacts were raised with the Deputy First
Minister and Cabinet Secretary for Education.   A response from the Deputy
First Minister was received on 31 January 2025 in which the concerns raised
were recognised and it was noted that additional bandwidth had now been
provided. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
This report relates to the Improvement and Modernisation Programme
and also relates to ‘Building a better future for our children and young
Page 143

Page 144

people in Moray’ as part of the LOIP and the priority to ‘provide a
sustainable education service aiming for excellence as part of the
Corporate Plan. 
(b) Policy and Legal
None. 
(c) Financial implications 
The following table provides a breakdown of the costs for this project: 
Item Value (£)
1. Professional services for implementation
and training
3,000
2. MDM Licences 21,500 
Total 24,500 
The costs are currently sitting against the ICT Capital Plan.  Professional
service costs will be met from Transformation budget.  Any additional
licence costs to schools for any new iPads that are purchased will be
covered by schools’ own budgets.  However, this will be closely
monitored and will still allow for savings compared with the initial
indicative pricing over the 5-year term in the ICT Asset Policy. 
(d) Risk Implications
The initial report to Committee highlighted a potential risk in relation to
DSM budgets with regard to the purchase of additional iPads.  As
indicated above, this report was predicated on the basis of a software
subscription model.  The figures in the table above are based on a
perpetual licence model, with no recurring costs for the existing devices. 
This will mitigate the licence costs arising from the purchase of additional
iPads.   
(e) Staffing Implications
There are no staffing implications arising from this report. 
(f) Property
There are no property implications arising from this report. 
(g) Equalities/Socio Economic Impact
For the purposes of this report an Equality and Socio Impact
Assessment is not required. 
(h) Climate Change and Biodiversity Impacts
There are no immediate climate change implications directly arising from
this report. 
(i) Consultations
Page 144

Page 145

The Head of Education, Quality Improvement Manager and Heads of
Service have been consulted and their comments incorporated into the
report. 
5. CONCLUSION 
5.1 Work continues on the ICT infrastructure to prepare for and ensure
readiness for digital development.   As part of this the MDM solution is
being deployed through a planned roll out.   The core ICT infrastructure
is being upgraded through the SWAN 2 programme on a phased basis
and residual issues within schools continue to remain the focus for ICT. 
A further update will be provided to this Committee in September 2025. 
Author of Report:  Graham Cooper, ICT Infrastructure Manager  
Background Papers: 
Ref: SPMAN-824703530-494 
Page 145

Page 146

Page 146

Page 147

REPORT TO:   EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 18 FEBRUARY 2025 
SUBJECT: INFORMATION REPORT: PRIMARY AND SECONDARY SCHOOL
CAPACITY AND OCCUPANCY 2024/25 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the Primary and Secondary School Planning
Capacities and Occupancy for session 2024/25. 
1.2 This report is submitted to Committee in terms of Section III (D) (1) of the
Council's Scheme of Administration relating to all the functions of the Council
as Education Authority. 
2. BACKGROUND 
2.1 Primary School Functional Capacities have been reported annually to this
Committee. Secondary School Functional Capacities have been included
since 2018/2019. 
2.2 The Working Capacity of the school is the maximum number of pupils that a
school can accommodate in any one year taking into account the
organisational needs of the school and in particular the age distributions of the
pupils. 
2.3 Guidance to Local Authorities on the determination of “School Capacity” set
out by the Scottish Government is followed when calculating the primary
school capacity in order to increase consistency across the country.
(Determining Primary School Capacity Guidance 2014) Two measures of
primary school capacity are used and are described as Planning Capacity
and Working Capacity. Planning Capacity is the physical, theoretical
measure of the total number of pupils which can be accommodated in a
school, based on the total number of teaching spaces, the size of these
spaces and the class size maxima.  Working Capacity is the more realistic
measure of the total number of pupils which can be accommodated in a
school in a particular school session. The Working Capacity is adjusted based
on the organisational needs of the school that session. eg. Taking into
account pupil roll, composite classes, etc. to calculate Working Capacity. 
Page 147

Page 148

2.4 In previous reports Planning Capacity was referred to as “Physical Capacity”
and Working Capacity as “Functional Capacity”.  In line with the above
guidance since September 2023,  the terms Planning Capacity and Working
Capacity have been used when reporting school capacities. 
2.5 The Working Capacity for each school is calculated on census day in
September each year, which in this case was 11 September 2024. 
2.6 The Working Capacity and percentage occupancy for session 2024/25 for
primary schools are attached in Appendix 1 (schools in alphabetical order)
and Appendix 2 (schools according to Associated School Group). Secondary
school capacities and percentage occupancy are attached in Appendix 3. 
2.7 In Moray the maximum class size in Primary 1 has been set at 25 and in
Primary 2 and 3 it has been set at 30 for session 2024/25. The maximum
class size in Primaries 4-7 has been set at 33. 
3. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) 
There is no direct connection to either of these plans from this report. 
(b) Policy and Legal
There is no policy or legal implication arising directly from this report. 
(c) Financial implications
The continuing over provision of pupil spaces has ongoing resource
implications for the council. 
(d) Risk Implications
There are no risk implications arising directly from this report. 
(e) Staffing Implications
There are no staffing implications arising directly from this report. 
(f) Property
There are no property implications arising directly from this report. 
(g) Equalities/Socio Economic Impact
There is no requirement for an equality impact or socio economic impact
assessment to be carried out. 
(h) Consultations
Primary and Secondary School Head Teachers and Senior Officers in
Education, Head of Education, Acting Head of Education, Resources
and Communities, Chief Financial Officer, Legal Services Manager,
Equal Opportunities Officer, and Caroline O’Connor, Committee Services
Officer have been consulted and are in agreement with the contents of
this report as regards their respective areas of responsibilities.
Page 148

Page 149

4. CONCLUSION 
4.1 Committee is asked to note the Primary and Secondary School
Capacities and Occupancy for Session 2024/25. 
Author of Report:           Lindsey Stanley, Business Support Team Manager 
Background Papers: 
Ref: SPMAN-9425411-474 
Page 149

Page 150

Page 150

Page 151

APPENDIX 1
PRIMARY SCHOOL
Working
Capacity
22/23
Working
Capacity
23/24
Working
Capacity
24/25
School Roll
22/23
School Roll 
23/24
School Roll 
24/25
% Occ.
Capacity   
22/23
% Occ.
Capacity   
23/24
% Occ.
Capacity   
24/25
Aberlour 167 165 167 109 105 113 65 64 65
Alves 125 125 125 74 77 80 59 62 64
Anderson's 307 317 317 251 259 270 82 82 85
Applegrove 463 462 458 299 278 269 65 60 85
Bishopmill 424 425 425 386 381 383 91 90 90
Botriphnie 50 50 50 18 18 19 36 36 38
Burghead 165 150 150 133 107 112 81 71 75
Cluny 392 407 375 329 318 329 84 78 88
Craigellachie 75 75 75 49 46 47 65 61 63
Cullen 195 190 185 100 102 93 51 54 50
Dallas 50 50 50 31 30 32 62 60 64
Dyke 106 100 100 81 72 82 76 72 82
East End 287 290 292 163 175 177 57 60 61
Findochty 150 150 150 57 58 55 38 39 37
Glenlivet 47 47 47 14 16 15 30 34 32
Greenwards 434 416 413 328 326 329 76 78 80
Hopeman 279 230 251 153 141 145 55 61 58
Hythehill 386 359 380 288 287 279 75 80 73
Keith 414 428 417 320 325 334 77 76 80
Kinloss 310 310 316 206 221 202 66 71 64
Knockando 75 75 75 40 44 39 53 59 52
Lhanbryde 266 262 243 169 156 139 64 60 57
Linkwood 401 414 415 314 295 271 78 71 65
Logie 75 75 75 42 42 16 56 56 21
Millbank 382 415 416 233 212 203 61 51 49
Milne's 238 259 254 191 196 200 80 76 79
Mortlach 213 176 160 129 125 123 61 71 77
Mosstodloch 287 292 292 177 179 172 62 61 59
Mosstowie 75 75 75 56 56 66 75 75 88
New Elgin 534 498 496 374 364 353 70 73 71
Newmill 75 75 75 63 67 69 84 89 92
Pilmuir 249 238 243 128 124 126 51 52 52
Portessie 166 156 150 117 121 123 70 78 82
Portgordon 125 125 125 46 43 37 37 34 30
Page 151

Page 152

Portknockie 150 150 150 66 67 56 44 45
Rothes 194 174 189 82 80 78 42 46 41
Rothiemay 75 75 75 51 55 47 68 73 63
Seafield 470 461 474 362 358 356 77 78 75
St Gerardine 352 350 350 295 300 310 84 86 89
St Peter's 125 133 125 112 102 109 90 77 87
St Sylvester's 208 180 183 113 95 99 54 53 54
St Thomas 75 75 75 46 38 36 61 51 48
Tomintoul 75 75 75 33 29 28 44 39 37
West End 257 272 264 191 185 201 74 68 76
TOTALS 9968 9561 9797 6819 6675 6622 68 68 68
Page 152

Page 153

Page 153

Page 154

Page 154

Page 155

APPENDIX 2
Buckie High School ASG
Cluny 392 407 375 329 318 329 84 78 88
Cullen 195 190 185 100 102 93 51 54 50
Findochty 150 150 150 57 58 55 38 37 37
Millbank 382 415 416 233 212 203 61 51 49
Portessie 166 156 150 117 121 123 70 78 82
Portgordon 125 125 125 46 43 37 37 34 30
Portknockie 150 150 150 66 67 56 44 45 37
St Peter's 125 133 125 112 102 109 90 53 87
ASG Total 1685 1726 1676 1060 1023 1005 63 59 60
Elgin Academy ASG
Bishopmill 424 425 425 385 381 383 91 90 90
East End 287 290 292 163 175 177 57 60 61
Seafield 470 461 474 362 358 356 77 78 75
St Sylvester's 208 180 183 113 95 99 54 53 54
West End 257 272 264 191 185 201 74 68 76
ASG Total 1646 1628 1638 1214 1194 1216 74 73 74
Elgin High School ASG
Greenwards 434 416 413 328 326 329 76 78 80
Linkwood 401 414 415 314 295 271 78 72 65
Mosstowie 75 75 75 56 56 66 75 75 88
New Elgin 534 498 490 374 364 353 70 73 71
ASG Total 1444 1403 1393 1072 1041 1019 74 74 73
Forres Academy ASG
Alves 125 125 125 74 77 80 59 62 64
Anderson's 307 317 317 250 259 270 81 82 85
Applegrove 463 462 458 299 278 269 65 60 85
Dallas 50 50 50 31 30 32 62 60 64
Dyke 106 100 100 81 72 82 76 72 82
Kinloss 310 310 316 206 221 202 66 71 64
Logie 75 75 75 38 42 16 51 56 21
Pilmuir 249 238 243 130 124 126 52 52 52
ASG Total 1685 1677 1684 1109 1103 1077 66 66 64
Keith Grammar School ASG
Botriphnie 50 50 50 18 18 19 36 36 38
Crossroads 50 ~ ~ 5 ~ ~ 10 ~ ~
Keith 414 428 417 320 325 334 77 76 80
Newmill 75 75 75 65 67 69 87 89 92
Rothiemay 75 75 75 53 55 47 71 73 63
St Thomas 75 75 75 46 38 28 61 51 37
ASG Total 739 703 692 507 503 497 69 72 72
Lossiemouth High School ASG
%
Occupant
Capacity
24/25
%
Occupant
Capacity
23/24
%
Occupant
Capacity
22/23
Functional
Capacity
22/23
School Roll   
22/23
Working
Capacity
23/24
School Roll   
23/24
Working
Capacity
24/25
School Roll   
24/25
Page 155

Page 156

Burghead 165 150 150 133 107 112 81 71 75
Hopeman 279 230 251 153 141 145 55 61 58
Hythehill 386 359 380 288 287 279 75 80 73
St Gerardine 352 350 350 295 300 310 84 86 89
ASG Total 1182 1089 1131 869 835 846 74 77 75
Milne's High School  ASG
Lhanbryde 266 262 243 169 156 139 64 58 57
Milne's 238 259 254 191 196 200 80 76 79
Mosstodloch 287 292 292 177 179 172 62 61 59
ASG Total 791 813 789 537 531 511 68 65 65
Speyside High School ASG
Aberlour 167 165 167 109 105 113 65 64 65
Craigellachie 75 75 75 49 46 47 65 61 63
Glenlivet 47 47 47 14 16 15 30 34 32
Inveravon ~ ~ ~ ~ ~ ~ ~ ~ ~
Knockando 75 75 75 40 44 39 53 59 52
Mortlach 213 176 160 129 125 123 61 71 77
Rothes 194 174 189 82 80 78 42 46 41
Tomintoul 75 75 75 33 29 28 44 39 37
ASG Total 846 787 788 456 445 443 54 56 56
Page 156

Page 157

Secondary
School
Functional Capacity
22/23
Working Capacity
23/24
Working Capacity
24/25 School Roll 22/23 School Roll 23/24 School Roll 24/25 % Occupant
Capacity 22/23
% Occupant
Capacity 23/24
% Occupant
Capacity 24/25
Buckie HS 944 944 944 837 826 811 89 88 86
Elgin Academy 1224 1224 1224 1028 1069 1074 84 87 88
Elgin HS 829 895 895 831 842 855 100 94 96
Forres
Academy 1121 1121 1121 851 821 873 76 73 78
Keith GS 553 553 553 377 370 372 68 67 67
Lossiemouth
HS 800 800 800 617 658 656 77 82 82
Milne’s HS 625 625 625 445 479 469 71 77 75
Speyside HS 562 562 562 402 395 378 72 70 67
TOTALS 6658 6724 6724 5388 5460 5488 81 81 82