Agenda Document Pack - Harbours Sub-Committee - 02/06/2026

Moray Council · 2 June 2026
Back to Harbours Sub-Committee — 2 June 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Some pages contain no extractable text. They may be blank, graphics or scanned pages. OCR has not been applied.

Page 1

Harbours Sub-Committee 
Tuesday, 02 June 2026 
NOTICE IS HEREBY GIVEN that a Meeting of the Harbours Sub-Committee is to be
held at Council Chambers, Council Office, High Street, Elgin, IV30 1BX on Tuesday,
02 June 2026 at 09:30. 
BUSINESS 
1. Sederunt 
2. Declaration of Group Decisions and Members Interests * 
3. Minutes of meeting dated 17 March 2026 5 - 8
4. Written Questions ** 
5. Compliance Summary
Report by Executive Director Economy, Enterprise and Operations  
9 - 122
6. Marine Safety and Operational Summary for Quarter 4 2025-
26
Report by Executive Director Economy, Enterprise and Operations  
123 -
134 
Page 1

Page 2

Summary of Harbour Sub Committee Functions
To fulfil the role of Duty Holder as described in the Port Marine Safety
Code, and to provide strategic oversight and direction for harbour
operations, giving greater focus and clarity on the Council’s role as
harbour authority.   
Watching the Meeting
You can watch the webcast live by going to:    
http://www.moray.gov.uk/moray_standard/page_43661.html    
Webcasts are available to view for 1 year following the meeting.  
You can also attend the meeting in person.  If you wish to attend
in person, please come to the High Street entrance door and a
member of staff will let you into the Chamber. 
Page 2

Page 3

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how the
individual or members of the group will vote on any item(s) of business on the
Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any relevant
and competent business within the specified remits not already on the agenda, to
the Chair provided it is received by the Proper Officer or Committee Services by
5pm three working days prior to the day of the meeting, please see Standing Order
36 for deadlines.  A copy of any written answer provided by the Chair will be
published on the Council’s committee management system by 12pm the day
before the meeting.  The Member who has put the question may, after the answer
has been published, may ask one supplementary question directly related to the
subject matter at the meeting, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the consent
of the Chair. If a Member does not have the opportunity to put a supplementary
question because no time remains, then he or she can submit it in writing to the
Proper Officer who will arrange for a written answer to be provided within 7
working days. 
Page 3

Page 4

MORAY COUNCIL 
Harbours Sub-Committee 
SEDERUNT 
Councillor Marc Macrae (Chair)
Councillor Amber Dunbar (Depute Chair)  
Councillor James Allan (Member)
Councillor Neil Cameron (Member)
Councillor Tracy Colyer (Member)
Councillor Sonya Warren (Member)  
Clerk Name: Lissa Rowan
Clerk Telephone: 01343563015
Clerk Email: lissa.rowan@moray.gov.uk 
Page 4

Page 5

MORAY COUNCIL 
Minute of Meeting of the Harbours Sub-Committee 
Tuesday, 17 March 2026 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor James Allan, Councillor Neil Cameron, Councillor Tracy Colyer, Councillor
Amber Dunbar, Councillor Marc Macrae, Councillor Sonya Warren 
IN ATTENDANCE 
Executive Director Economy, Enterprise, and Operations; Head of Operations and
Environment; Interim Service Manager Harbours; and L Rowan, Committee Services
Officer.   
1         Chair 
Councillor Macrae chaired the meeting. 
2         Declaration of Group Decisions and Members Interests 
In terms of Standing Orders 21 and 23 of the Councillors’ Code of Conduct, there
were no declarations from Group Leaders or Spokespersons regarding any prior
decisions taken on how Members will vote on any item on the agenda or any
declarations of Member’s interests in respect of any item on the agenda.    
3         Minute of Meeting dated 4 December 2025 
The Minute of the meeting of the Harbour Sub Committee dated 4 December 2025
was submitted and approved. 
4         Written Questions 
The Committee noted that no written questions had been submitted.    
5         Marine Safety and Operational Summary for Quarter 3 2025-26 
The meeting had before it a report by the Executive Director Economy, Enterprise and
Operations informing the Committee on matters of Marine Safety and compliance
with the Port Marine Safety Code (PMSC) for Quarter 3 2025/26. 
Item 3.
Page 5

Page 6

During discussion surrounding harbour dredging, Councillor Cameron requested that
the harbour’s dredging plan be included within future reports, noting that providing
the specific number of hours or days allocated for dredging would reassure harbour
users that a clear plan is in place. 
In response, the Head of Operations and Environment agreed to include the
harbour’s dredging plan in future reports and advised that she would circulate the
plan to the Committee following the meeting. 
Cllr Cameron welcomed the report and suggested that, as it is a public document
likely to be read by harbour users, a glossary of technical terms should be included to
assist readers unfamiliar with specialist terminology. 
In response, the Head of Operations and Environment agreed to include a standing
appendix with future reports offering an easily understandable guide to harbour
terminology which would explain terms such as “duty holder” and the “Port and
Marine Facility Safety Code” to support readers without technical knowledge. 
Cllr Warren sought clarification on several harbour infrastructure matters. She noted
that the report identifies structural issues at Buckie, Portknockie and Cullen, however
queried why a wall at Findochty Harbour, which had been reported at a recent
harbour meeting to have moved by five inches, was not included and whether this
was a new issue. She further asked whether the current capital plan has sufficient
funding to address the identified structural problems, how significant the issues are if
they cannot be repaired promptly, and how repairs will be prioritised. 
In response, the Head of Operations and Environment advised that the wall at
Findochty Harbour is understood to be a flood structure rather than part of the
harbour infrastructure, however advised that she would confirm this with the
structural engineering team and report back to the Committee following the meeting.
She explained that all fixed harbour infrastructure is routinely inspected, with
condition reports used to rank assets by risk and priority, and capital funding
allocated to those requiring the most urgent work however to provide the Committee
with confidence in its role as duty holder, she suggested providing a one-off report to
a future meeting of the Harbour Sub Committee setting out the inspection and
prioritisation processes in more detail. 
Cllr Warren asked for an update on plans to make Buckie Harbour more attractive
and welcoming for visiting cruise vessels. She referred to discussions at the Buckie
Harbour meeting in relation to improvements that could enhance the harbour’s
appearance and appeal to tourists and requested information on what actions the
Council is taking or could take to support this. 
In response, the Head of Operations and Environment advised that she would update
the Committee on any future developments regarding visiting cruise vessels. 
In relation to Harbour User meetings, Cllr Cameron noted that these meetings
currently operate in isolation, aside from officer attendance, and proposed that
regular reporting to the Harbour Sub Committee could provide a more cohesive
understanding of activity across different harbours and suggested that the Harbour
Sub Committee consider receiving updates from the various Harbour User meetings. 
Page 6

Page 7

In response the Head of Operations and Environment agreed to include an update
from each Harbour User meeting in the quarterly reports to the Harbour Sub
Committee. 
Cllr Warren sought clarification as to whether the council is fully licensed and
compliant in relation to the storage of waste oil, particularly at Buckie but also across
other harbours and queried whether all harbour users are aware of the correct
procedures, locations, and proper methods for storing both waste oil and fuel. 
In response, the Interim Service Manager, Harbours advised that the Harbourmaster
had already raised the issue of oil storage and carriage at a recent Harbour User
Meeting, and confirmed it is a key area the team will be reviewing. He advised that the
fuel tank at Burghead has already been examined to ensure compliance, and the
team will next review arrangements at the smaller harbours and that an update will
be reported back to the Committee once this work has been completed. 
Thereafter, Councillor Cameron moved that the Committee accept the
recommendations printed within the report with the exception of the proposed
delegation of authority to the Head of Operations and Environment in consultation
with the Chair of Harbours Sub-Committee to declare full or partial compliance
(based on evidence no later than 30 March 2026) with the Port and Marine Facilities
Safety Code by 31 March 2026 as it was his view that the Committee, being the
designated duty holder, should be responsible for any declaration of full or partial
compliance with the Port and Marine Facilities Safety Code. 
Councillor Dunbar, being content with the recommendations in the report, moved
that the Committee agree the recommendations as printed. This was seconded by
the Chair. 
In order to provide assurance to the Committee in relation to the proposed delegation
of authority to the Head of Operations and Environment in consultation with the Chair
of Harbours Sub-Committee to declare full or partial compliance (based on evidence
no later than 30 March 2026) with the Port and Marine Facilities Safety Code by 31
March 2026, the Head of Operations and Environment offered to provide an informal
update to the Committee prior to 31 March 2026 to outline progress in relation to
compliance with the Port and Marine Facilities Safety Code. 
After considering the advice from the Head of Operations and Environment,
Councillor Cameron was content to receive an informal update on compliance with
the Port and Marine Facilities Safety Code and withdrew his original motion. 
The Committee joined the Chair in welcoming the considerable progress across all
the harbours in Moray and thereafter agreed: 
(i) to note the actions taken against achieving compliance with the PMSC as
set out in paragraph 4.7 of the report; 
(ii) to delegate authority to the Head of Operations and Environment in
consultation with the Chair of Harbours Sub-Committee to declare full or
partial compliance (based on evidence no later than 30 March 2026) with
the Port and Marine Facilities Safety Code by 31 March 2026 subject to the
provision of an informal update for the Committee outlining progress in
Page 7

Page 8

relation to compliance with the Port and Marine Facilities Safety Code; 
(iii) to note the reported progress against the KPIs for the Marine Safety Plan
2025-2028, fulfilling their function as Duty Holder under the Port Marine
Safety Code (PMSC) as set out in paragraphs 4.8 and 4.9 of the report; 
(iv) to note the harbours financial position as set out in paragraph 5,
operations activity report as set out in paragraph 6, and conservancy
reports as set out in paragraph 7; 
(v) that the harbour’s dredging plan would be included in future reports; 
(vi) to include a standing appendix with future reports offering an easily
understandable guide to harbour terminology; 
(vii) that a report setting out the inspection and prioritisation processes for
harbour infrastructure be brought to a future meeting of this Committee; 
(viii) that any developments in relation to visiting cruise vessels would be
brought to this Committee for consideration; 
(ix) to include an update from each Harbour User meeting in the quarterly
reports to this Committee; and 
(x) to note that an update on the Council’s compliance with oil and fuel
carriage and storage will be reported back to a future meeting of this
Committee once work in this area has been completed.   
Page 8

Page 9

Report to: Harbours Sub
Committee 
Meeting Date: 2 June 2026  
Report by: Executive Director Economy, Enterprise and Operations 
Author: Cameron MacPhail  Contact
Email:
cameron.macphail@moray.gov.uk 
Subject: Compliance Summary 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to inform the Harbour Sub Committee (HSC) on matters of
Marine Safety and compliance with the Port Marine Safety Code (PMSC). 
1.2  This report is submitted to the Harbour Sub Committee in terms of Section III (F) (25) of the
Council's Scheme of Administration relating to the functions of Council as Statutory
Harbour Authority (SHA). 
2.  SUMMARY  
2.1  The report sets out the following updates that were carried out to processes, procedures
and the Marine SMS in order for the Council to declare compliance to the PMSC, and
seeks approval of the amendments made. 
3.  RECOMMENDATIONS 
3.1  It is recommended that the Sub Committee:   
i)  Notes that the Head of Operations and Environment, in consultation with the
Chair of Harbour Sub Committee, declared compliance with the PMSC on 31
March 2026; and 
ii)  Approves the policy documents and amendments to the Marine Safety
Management System referenced and included in the appendices to this
report.   
Cameron MacPhail
Interim Service Manager Harbours 
Item 5.
Page 9

Page 10

4.  Moray Council Harbours PMSC – Summary  
4.1  Summary of outstanding non-compliances closed since February 2026 
Subject Evidence required for
compliance
Recommendations Current compliance
status
Dangerous
Vessels
If the Organisation is a
Harbour Authority, are
powers to issue
Dangerous Vessels
Directions by the
Harbour Master
included in the Marine
Safety Management
System (MSMS)?
A detailed
procedure should
be produced. 
Dangerous Vessel policy
and procedure to be
written and integrated
into the MSMS.
Ensure required staff
knowledge is captured on
competency records.
Staff trained and
assessed. 
Complete – Dangerous
Vessel management
section included in MSMS
Pilotage
Competent
Harbour
Authority
(CHA)
Has an FRA been
conducted into the
requirement for
Pilotage?  Is the
Organisation a CHA?
An FRA for the
requirement of
pilotage should be
conducted for all
harbours. 
FRAs to include an
assessment for all
harbours and update the
Buckie FRA to clarify the
Buckie pilotage
jurisdiction. 
Complete – Navigational
Risk Assessments identify
control measures for
Pilotage and referenced in
MSMS
Enforcement
Policy
Is there clear policy on
enforcement and
prosecution?
A policy on
enforcement must
be produced and
approved by the
Duty Holder.  
Enforcement policy
drafted and with legal
service for verification
prior to being brought to
Duty Holder for approval
and integration into the
MSMS. 
Complete – Policy
attached for approval
Assessment
of Vessel
Traffic
Management
using Marine
Guidance
Note (MGN)
401 (MCA,
2022) 
Has a Formal Risk
Assessment (FRA) been
conducted into the
requirement for a Vessel
Traffic Service.
An FRA needs to be
conducted to
determine the level
of Vessel Traffic
Management
required at each of
the harbour areas.
Risk Assessments and
Operational procedures
to be updated. 
Complete – Formal Safety
Assessment carried out 
4.2  Dangerous Vessel Directions, (PMSC Section 4.23) – amendment to HSMS in line with
Section 1 of the Dangerous Vessel Act 1985. This update provides governance and
Page 10

Page 11

directions for the harbours team to execute the management of dangerous vessels. Note:
the directions may be overridden by the SOSREP who may issue contrary directions to the
Harbour Master. The Marine Safety Management System as attached as Appendix 1 for
approval contains the procedures. 
4.3  Pilotage and Navigational Risk Assessments
Navigational Risk Assessments (PMSC Section 5) – Navigational Risk Assessment (NRA)
for Buckie harbour reviewed and additional five NRAs for the recreational harbours
assessed and drafted. Outputs of the NRAs suggest a navigational control measure to limit
vessel size to all harbours (except Buckie) to 15m length overall (LOA), without the express
permission of the Harbour Master. This does not mean vessels over 15m cannot be
accommodated at the five recreational harbours, but a formal RA will be carried out by the
Harbour Master prior to berthing approval. The Navigational Risk Assessments are
available via CMIS as additional information. 
4.4  Pilotage (PMSC Section 4.25) – following the completion of the Navigational Risk
Assessments and limiting LOA factor, it is deemed through formal assessment the LOA
mitigation supports that the current provision of pilotage covering all Moray Council
Harbours is not required. Non Compulsory Pilotage remains an offering for Buckie alone
and this is detailed within the NRA. Suggestion Moray Council seek to undertake a formal
assessment of the 1987 Pilotage Act and risk assess to determine if Pilotage at Buckie
Harbours should be compulsory for vessels of a specified length. 
4.5  Enforcement Policy – new policy drafted to ensure Moray Council, under the statute of
Grampian Regional Council (Harbours) Order Confirmation Act 1987 Part III clause 29, can
carry out enforcement within the Moray Council Harbours jurisdiction. Byelaws and
directions have been adopted to manage the identified marine safety and conservancy
risks.  The policy is attached at Appendix 2 for approval by this Sub-Committee. 
4.6  Vessel Traffic Management – A formal Safety Assessment (FSA) has been carried out to
assess the management of navigation and traffic across all Moray Council harbours. The
outcome of the assessment derived that the current navigational management of Moray
Council Harbours, via a Local Port Service, is appropriate to the level and type of traffic
currently handed at the ports. Improvements include promulgating Notice to Mariners in a
timely manner, the inclusion of a single point contact for all harbour users (i.e. Buckie Duty
Watchman), and suggested VHF calling for arrival and departure at harbours. The Harbour
Master has drafted a suggested Notice to Mariners relating to VHF communication. The
Formal Safety Assessment is attached at Appendix 3 for noting. 
4.7  Other Minor Amendments to the MSMS 
Whilst not relating to closing the non-compliances, some other minor amendments to the
MSMS have been included for approval. These are:
• Pilotage act, conduct and liability – inclusion of wording to reflect the act of
pilotage, the conduct expected of the pilots (including suspension of
authorisation), and limited liability placed on the pilot act, which is limited to £1000
per act.
• Training requirements – update to reflect legislation and training requirements for
Oil Spill Contingency, and the provision of Local Port Service function training.
• References to existing powers and guidance on use of special directions (section
1.3).
Page 11

Page 12

• Port Facility Security Plan (ISPS) – current OBC (cargo) security plan updated to
reflect future PAX (passenger/cruise) operations. Plan submitted to the DFT
Maritime Compliance Division for approval. 
5. SUMMARY OF IMPLICATIONS  
5.1 The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  
Policy and Legal  
Financial  
Risk  
Staffing  
Best Value and Transformation  
Property  
Information Communications Technology/Digital            
Equalities. Social Inclusion and Economic Impact            ✓    
Climate Change and Biodiversity Impact   
5.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following
Council Plan strategic priorities:
☒ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report
support and contribute to improved outcomes for communities as outlined in the
following Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☐ Improving wellbeing of our population   
5.3 Policy and Legal 
The Council aims to run the harbours in compliance with the PMSC and within the
legislative framework set out for harbours. Non compliance with the code will have legal
implications. 
Page 12

Page 13

5.4 Financial 
Non compliance with the code may have financial implications. 
5.5 Risk 
Non compliance with the PMSC could result in the prosecution of the authority. 
5.6 Staffing 
There are no staffing implications. 
5.7 Best Value and Transformation 
None. 
5.8 Property 
There are no implications for property. 
5.9 Information Communications/Technology/Digital 
None. 
5.10 Equalities, Social Inclusion and Economic Impact 
There are no implications arising from this report. Any policy amendments are technical in
nature and do not impact on equalities, social inclusion or socio-economic matters. 
5.11 Climate Change and Biodiversity Impacts 
None. 
6. CONSULTATION  
6.1 This report has been prepared in consultation with the Executive Director Economy,
Enterprise and Operations, Head of Operations and Environment, Service Manager Legal
Services, Senior Engineer (Flood Risk Management), Principal Climate Change Officer,
Equalities Officer and L Rowan, Committee Services Officer and any comments made
have been incorporated into the report. 
7. BACKGROUND PAPERS  
7.1 N/A   
Page 13

Page 14

No embedded text on this page.

Page 15

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 1 OF 75
ISSUE A REV 01.9 MARCH 2026 
Appendix 1 
HARBOURS 
SAFETY MANAGEMENT
SYSTEM 
Page 15

Page 16

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 2 OF 75
ISSUE A REV 01.9 MARCH 2026 
Version control template 
Date of Creation: January 2002
Owner (Service): Harbours Service
Reviewer Service Manager: Environment and Operations
Approver Executive Director: Economy, Enterprise & Operations
Date Approved: May 2026
Approver (Committee): Harbour Sub Committee
Date Approved: xxxx
Next Review Date:  22 October 2026 
Version History
Version Date Author Changes Made Approved
By
1.0 Jan
02
C J MIDDLETON - HARBOUR
SERVICE Implementation 
1.1 Oct
06
C J MIDDLETON - HARBOUR
SERVICE Minor revisions K STRATTON
1.2 Dec
07
C J MIDDLETON - HARBOUR
SERVICE
Burghead launch procedure
revision K STRATTON
1.3 Feb
10
W MACKAY - HARBOUR
SERVICE
Update  Buckie operating
constraint  K STRATTON
1.4 Apr
12
C J MIDDLETON - HARBOUR
SERVICE General review and update K STRATTON
1.5 Oct
17
D BREMNER – HARBOUR
SERVICE General review and update N MOSS
1.6 Jan
20
D BREMNER – HARBOUR
SERVICE
Comprehensive review and
update N MOSS
1.7 Oct
24
D BREMNER – HARBOUR
SERVICE General review and update N MOSS
1.8 0ct 25 P JENNINGS – HARBOUR
SERVICE Update against revised PMSC  HSC
1.9 May
26
C McPhail – Interim Service
Manager Harbours
Update against revised PMSC
and audit 
Page 16

Page 17

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 3 OF 75
ISSUE A REV 01.9 MARCH 2026 
DISTRIBUTION LIST 
COPY NO HOLDER NOTE
1 Harbours Compliance Folder Shared folder
2 Duty Holder – Members of Harbour Sub Committee Electronic copy 
Page 17

Page 18

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 4 OF 75
ISSUE A REV 01.9 MARCH 2026 
TABLE OF CONTENTS 
Page
ABREVIATIONS ............................................................................................................................... 5
CROSS REFERENCE TABLE  ........................................................................................................ 5 
1 INTRODUCTION ........................................................................................................................ 6
1.1 Purpose and Application ...................................................................................................... 6
1.2 Policy Statement .................................................................................................................. 6
1.3 Applicable Codes and Regulations .................................................................................. 6 - 8
1.4 Duties Holders - Duties, Powers and Responsibilities.......................................................... 9
1.5 Responsible Persons - Moray Harbours ........................................................................ 9 - 10
1.6 Organisation Chart ............................................................................................................. 11
1.7 Qualifications and Training ................................................................................................ 12
1.8 Document control procedures………………………….……......................................................... 13
1.9 Review and Revision .......................................................................................................... 13
2 OVERVIEW OF THE HARBOURS .............................................................................................. 14
2.1 Buckie .......................................................................................................................... 14 - 18
2.2 Burghead ..................................................................................................................... 18 - 21
2.3 Recreational Harbours ....................................................................................................... 22
2.4 Principal Hazards ................................................................................................................ 23
3 RISK MANAGEMENT............................................................................................................... 24
3.1 Introduction ....................................................................................................................... 24
3.2 Purpose .............................................................................................................................. 24
3.3   Scope .................................................................................................................................. 24
3.4   Responsibilities ................................................................................................................... 25
3.5   Procedure .................................................................................................................... 25 - 26
3.6   Definitions .......................................................................................................................... 26 
3.7   Toolbox Talks ............................................................................................................... 26 - 27
3.8 Unusual/Exeptional Operations ......................................................................................... 27
3.9   Contractor Compliance………………………………....………………………………………………………………27
3.10 Generic Review Of Hazards…………………………………..………………………………………….…….27 - 28
4 EMERGENCY RESPONSE PROCEDURES .................................................................................. 29
4.1 Relevant Emergency Response Plans ................................................................................. 29
Working in Partnership ………………………………………………………………………………………………..29
Emergency Planning in Moray ……………………………………………………………………………………..29
Oil Pollution Arrangements…………………………………………………………………………………………..29
4.2 Review and Updates .......................................................................................................... 29
4.3 Exercises and Drills ............................................................................................................. 30
5 PERFORMANCE MONITORING ............................................................................................... 31
5.1 Periodic Review and Reporting………………………………………………………………………………………31
5.2 Auditing .............................................................................................................................. 31
Page 18

Page 19

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 5 OF 75
ISSUE A REV 01.9 MARCH 2026 
6     HANDLING OF DANGEROUS GOODS ……………………………………………………………………….………… 32
7     ISPS CODE……………………………………………………………………………………………………………………………33
8    PORT WASTE RECEPTION FACILITIES…………………………………………………………………………………….34
9    CONSERVANCY……………………………………………………………………………………………………………...34 - 38
10   AIDS TO NAVIGATION…………………………………………………………………………………………………..39 - 40
11   PILOTAGE ARRANGEMENTS………………………………………………………………………………………….41 - 43
12   OTHER HARBOUR CRAFT…………………………………………………………………………………………..…………44
13   INCIDENT & NEAR MISS REPORTING ……………………………………………………………………………………45 
Incident reporting Procedure Flowchart…………………………………………………………………………46 
Introduction……………………………………………………………………………………………………………………47 
Purpose. ...........................................................................................................................   47
Scope .................................................................................................................................. 47 
Responsibiliities ................................................................................................................. 48 
Procedure ...................................................................................................................... 48-49 
Internal Incident Reporting .......................................................................................... 49 -50 
RIDDOR and other agencies ............................................................................................... 50 
Record Keeping ........................................................................................................... 50 - 51 
Investigations .......................................................... ……………………………………………………….51      
Definitions….…………………………………………..………………………………………………………………51 -52     
Incident and Near Miss Summary………………………………………………………………………………...52
14 PERMIT TO WORK ………………………………………..……………………………………………………………..53
Introduction ………………………………………………………………………………………………………………..53
Scope ………………………………………………………………………………………………………………………….53
Responsibilities …………………………………………………………………………………………………………..54
Work which requires a permit……………………………………………………………………………………..54
Work which does not noramlly require a permit………………………………………………………….55
Authorisation ………………………………………………………………………………………………………………55 
Planning ………………………………………………………………………………………………………………………55
Identification and tracking of forms ………………………………………………………………………55 -56
Changes to permit ……………………………………………………………………………………………………….56
Validity ………………………………………………………………………………………………………………………..56
Suspending a permit ……………………………………………………………….………………………….……….56 
Lock, tag, and try ……………………………………………………………………………………………….…56 - 57
Permit form completion ………………………………………………………………………………………………57
Copy of a permit ………………………………………………………………………………………………………….58
15   RECREATIONAL ACTIVITIES………………………………………………………………………………………………….59
APPENDICES 
A PASSAGE PLANNING………………………………………………………………………………………………………..…60
1 Buckie ……………………………………………………………………………………………………………………………60
2 Burghead ……………………………………………………………………………………………………………………….60
B MORAY COUNCIL PROCEDURES……….……..………………..……………………………………….……......61
C MORAY COUNCIL HEALTH AND SAFETY POLICY…………………………………………………..….62 - 63
D HARBOURS ENVIRONMENTAL POLICY……………………………………………………………………………64
E DRONE POLICY……………………………………………………………………………………………………………….65
F EMERGENCY CONTACT DETAILS……….……..…………………………………………………………………….66
G            HANDLING OF DANGEROUS GOODS ……………………………………………………………………………..67
H            COMPETENCY ASSESSMENT ………………………………………………………………………………………….68
Page 19

Page 20

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 6 OF 75
ISSUE A REV 01.9 MARCH 2026 
Cross reference table 
Port Marine Safety Code-
section name
PMSC – Subject Heading PMSC Paragraph
Reference
Moray Council SMS
Document Reference
Background Harbour Authority  MC HSMS
1. Accountability for
marine safety
Accountability 1.1-.2 MC HSMS 
Duties and powers 1.3-1.5 MC HSMS 
The Duty Holder 1.6-1.10 MC HSMS page 9 
The Designated Person 1.11-1.12 MC HSMS 
Chief Executive or equivalent 1.13 MC HSMS 
Harbour Master  1.14 -1.15 MC HSMS 
The authorities officers 1.16 -1.17 MC HSMS
2. Key measures to
secure marine safety 
Key measures 2.1-2.2 MC HSMS 
Review existing powers 2.3-2.6 MC HSMS 
Use formal risk assessment 2.7-2.11 MC HSMS 
Implement a marine safety
management system
2.12-2.17 MC HSMS 
Competence standards 2.18 MC HSMS 
Incident reporting and
investigation 
2.19-2.23 MC HSMS 
Monitoring performance and
auditing
2.24 MC HSMS 
Enforcement 2.25 MC HSMS 
Publication of plans and reports 2.26 MC HSMS 
Consensus  2.29 MC HSMS 
Monitoring compliance 2.30-2.31 MC HSMS
3. General Duties and
Powers
General duties and powers  3.1-3.3 MC HSMS 
Safe and efficient port marine
operations
3.4 MC HSMS 
Open port duty  3.5 MC HSMS 
Conservancy duty 3.6-3.7 MC HSMS 
Environmental duty 3.8 MC HSMS 
Civil contingencies duty 3.9 MC HSMS 
Harbour authority powers 3.10-3.11 MC HSMS 
Revising duties and powers 3.12-3.14 MC HSMS
4. Specific Duties and
Powers
Specific duties and powers  4.1 MC HSMS 
Appointment of harbour master 4.2 MC HSMS 
Byelaws 4.3-4.4 MC HSMS 
Directions (special) 4.6-4.7 MC HSMS 
Directions (general) 4.8-4.9 MC HSMS 
Dangerous vessel directions 4.10 MC HSMS 
Pilotage and pilotage directions 4.11-4.12 MC HSMS 
Authorisations of pilots 4.13-4.14 MC HSMS 
Pilot exemption certificates 4.15-4.16 MC HSMS 
Collecting dues 4.17-4.20 MC HSMS 
Aids to navigation 4.21-4.24 MC HSMS 
Wrecks and abandoned vessels 4.25-4.32 MC HSMS    
Page 20

Page 21

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 7 OF 75
ISSUE A REV 01.9 MARCH 2026 
1.0 INTRODUCTION 
1.1 Purpose and Application 
This document demonstrates Moray Council’s commitment to operate its Harbours in a safe and
environmentally sound manner to the benefit of staff, vessels and their crews, users and the
community at large.  It endeavours to reduce risks arising from the day to day operations to a
level as low as reasonably practicable and gives guidance to staff and others involved in
operations on best practice to achieve safe and efficient use of the Harbours, their approaches
and environs. 
It applies variously to all persons, vessels and craft using, providing services to or otherwise
involved with commercial activities on waterways within the various harbour limits.  It applies to
the all areas and quaysides within the harbour limits, defined in the Byelaws and as shown in
the Directory of North-East Council Harbours and to other areas over which Moray Council, as
the harbour authority, may have jurisdiction from time to time.   
1.2 Policy Statement 
Moray Council recognises its continuing responsibility to provide a healthy and safe working
environment and maintain the conservancy of the harbours. Hence, they implement policies in
line with provisions of the Health & Safety at Work Act 1974 and the Department for Transport
(DfT) Port & Marine Facilities Safety Code (PMSC), 2025 (and subsequent updates).  Moray
Council will: 
• Carry out harbour and associated marine operations, in a manner which minimises
effects on the environment and the community and which protects the safety and health
of: employees; users; others with business in the harbour areas; the general public;
• Operate wherever practical to at least the standards required by law and regulation
whilst meeting the changing needs of marine users.
• Maximise the quality and value for money of its services
• Ensure that employees perform their duties in a manner consistent with these principles
and recognise, that the duty holder is ultimately responsible for meeting the standard
the code requires.  
1.3 Applicable Codes and Regulations 
Below is a summary of the more relevant legislation.  Individual documents should be consulted
for detailed requirements and obligations. 
1.3.1 Port & Marine Facilities Safety Code 
The Port & Marine Facilities Safety Code sets standards for the operation of UK Ports.  It
codifies Duties and Responsibilities of harbour authorities and requires that ports be operated
on the basis of Risk Assessment and a Safety Management System. 
The PMSC is complimentary to Health & Safety legislation discussed below.  In broad terms,
the interface is at the quayside.
Page 21

Page 22

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 8 OF 75
ISSUE A REV 01.9 MARCH 2026 
Harbour operations should meet the standards of the associated Guide to Good Practice on
Port Marine Operations – Prepared in Conjunction with the PMSC, issued as April 2025.   
1.3.2 Health and Safety at Work Act (HSWA) and Regulations. 
The Health & Safety at Work Act 1974 and other health & safety legislation applies to dock
operations including the loading and unloading of UK and foreign flag vessels at UK ports and to
the handling of dangerous substances in ports and harbours.  It does not apply to normal
shipboard activities carried out by the master and crew of vessels but does form an interface
with the Merchant Shipping (Health and Safety at Work) regs 1997.  Port users including
fishermen and fish sellers have a responsibility to comply.  Harbour staff must abide by its
provisions. 
1.3.3 Pilotage Act 1987 
This legislation addresses Competent Harbour Authorities, Pilotage Districts and other pilotage
arrangements.   It facilitates overall administration of the pilotage service at Buckie although
Moray is a Competent Harbour Authority within the meaning of the Act. 
1.3.4 Docks Regulations 1988 and Approved Code of Practice 
Specific to quayside work, generally the responsibility of the port users.  Harbour staff have an
oversight duty to ensure safe practices within the Harbour Area and should have a general
knowledge of the regulations. 
1.3.5  International Ship and Port Facility Security Code (ISPS) 2004 
Applies to commercial harbours handling vessels on international voyages, in the case of Moray
Harbours, to Buckie only.  Requires an approved Security Plan, appointment of Port Facility
Security Officers, arrival reports on security status and control of access to international vessels. 
Buckie complies in these respects. 
1.3.6  Port Waste Facilities Management Regulations 2003 
Requires the reporting and recording of the landing of waste by ships and the provision of
appropriate facilities by harbour authorities.  The purpose is to eradicate the dumping of waste
at sea. 
1.3.7 Grampian Regional Council (Harbours) Order Conformation Act (1987) and
Grampian Regional Council Harbour Byelaws (1990) 
The Grampian Regional (Harbours) Order Conformation Act is the legal document under which
the harbours are run.  The purpose of the order is to allow for better provision for the
administration, improvement and regulation of the 6 Moray harbours.  It also allows the harbours
to create byelaws to further aid these goals. 
Page 22

Page 23

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 9 OF 75
ISSUE A REV 01.9 MARCH 2026 
1.3.8  Other Legislation 
The authority has obligations under the following legislation, some of which include express
planning duties: 
▪ Dangerous Substances in Harbour Areas Regulations 1987
▪ Dangerous Goods in Harbour Areas Regulations 2016
▪ Control of Major Accident Hazard Regulations 
▪ Merchant Shipping (Oil Pollution Preparedness Response & Cooperation
Convention) Regulations 1998
▪ Merchant Shipping Act 1995
▪ Merchant Shipping (Prevention of Oil Pollution) Regulations 1996
▪ Dangerous Vessels Act 1985
▪ SOSREP – Sections 151 and 293 of MS Act 1995 and as amended by MS and
Maritime Security Act 1997 
▪ Merchant Shipping (Dangerous Goods & Marine Pollutants) Regulations 1990
▪ Merchant Shipping (Prevention of Pollution by Garbage) Regulations 1998
▪ Merchant Shipping (Port Waste Reception Facilities) Regulations 1997
▪ Aviation & Maritime Security Act 1990
▪ Civil Contingencies Act 2004. 
A full list of relevant legislation is appended to the Guide to Good Practice on Port Marine
Operations.   
1.3.9 Existing Powers 
The Code requires Harbour Authorities to review their powers to ensure they discharge their
duties correctly, and do not exceed their powers.  Powers and duties of Moray Council as the
Harbour Authority are contained with the 1987 Confirmation Act.  Further powers are provided
for through Bye-laws, which must be agreed with Scottish Ministers before issue.  Moray
Council is the Statutory Harbour Authority and Local Lighthouse Authority.  In these capacities it
is directed by Acts of Parliament and answerable to Parliament and Scottish Ministers should it
exceed its powers, or fail in its duty.  Should this occur, Moray Council is subject to a full range
of review procedures.  Moray Council powers and duties are derived primarily from the following
legislation: 
• Harbours, Docks and Piers Clauses Act 1847;
• The Harbours Act 1964; 
• Grampian Harbours Confirmation Act 1987
• Merchant Shipping Act 1995. 
1.3.10 Open Port Duty 
Harbour authority’s statutory powers are subject to what is called the ‘open port duty’.  This
means that the harbour, dock, or pier must be open to anyone for the shipping and unshipping
of goods and the embarking and landing of passengers, on payment of the rates and other
conditions set by the local legislation for that port.    
Page 23

Page 24

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 10 OF 75
ISSUE A REV 01.9 MARCH 2026 
The concept of ‘open harbour duty’ is covered by Section 33 of the Harbours, Docks and Piers
Clauses Act 1847.  Section 33 of the Harbours, Docks and Piers Clauses Act 1847 applies to
Moray Council and they have a statutory duty to maintain it. 
1.3.11 Special Directions   
In considering the role of the Harbour Master, the Harbours Docks and Piers Clauses Act, 1847,
Section 51 states that:  
‘The undertakers may appoint such harbour masters as they think necessary, (including in such
expression dock masters and pier masters, as herein-before defined,) and from time to time, as
often as they think fit, may remove any such harbour master.’  
Therefore, authorised Harbour Master or his deputies may exercise the powers of the Harbour
Master.  The principal responsibility for navigational safety lies with the Harbour Master who, by
virtue of Confirmation Oder enables the harbour master to issue special directions:  
(1)The harbour master may give a direction under this article:
a) requiring any vessel anywhere within the port or the approaches to the port to comply
with a requirement made in or under a general direction;
b) regulating the time at which and the manner in which any vessel shall enter into, go out
of, or lie in or at the port;
c) for securing that vessels move only at certain times or during certain periods;
d) prohibiting the mooring of vessels in any particular part or parts of the port;
e) regulating or requiring the movement, mooring or unmooring of a vessel; and
f) regulating the manner in which a vessel takes in or discharges (from ship to shore or
shore to ship) passengers, cargo, fuel, water, ship’s stores or ballast in the port; 
(2) A special direction may be given in any manner considered by the harbour master to be
Appropriate; and  
(3) The harbour master may revoke or amend a special direction. 
1.3.12  Consultation Process 
Moray Council Harbour Authority’s Safety Management System has been developed through a
combination of the harbour teams experience and most importantly through risk assessment
and consultation.  Consultation is an ongoing process which is principally achieved through the
Harbour User Groups (HUGs). 
HUGs are established for each of the harbours to provide the Authority with a ready means for
consulting with users and the local community.  The committees meet approximately 2 times a
year at intervals chosen by the committee.  Membership is drawn from users, various clubs
associated with the harbour and community councils.  Each Harbour User Group has its own
constitution. 
The following groups and organisations are involved with the HUG.
• Moray Council Harbour Team
• Shipping Companies
• Shipping Agents
Page 24

Page 25

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 11 OF 75
ISSUE A REV 01.9 MARCH 2026 
• Stevedoring Services
• Fishing industry
• Fish Selling Agents
• Forsyths, smaller manufacturing companies and other relevant commercial enterprises
• Macduff Shipyard and other marine services
• Recreational Users
• 3 Harbour Associations
• Findochty Water Sports Club 
Updates are given on various projects, and views sought on a variety of topics.  This gives the
harbour team an opportunity to consult harbour users on a range of subjects, including aspects
of this SMS. 
Some subjects require more detailed harbour user input. On these occasions, email or post is
used to consult all harbour users. 
The Harbours Team remain in contact with the emergency services i.e. Police Scotland, RNLI,
Coastguard (please refer to contents lists on page at the rear of this document) 
1.4 Duty Holders – Duties, Powers and Responsibilities 
The PMSC defines the Duty Holder for a harbour authority as the Board of Management.    In
the case of local authority harbours the “Board” is the responsible council committee (See
Organisational Chart).  In the case of Moray Council the position of Duty Holder is the Harbour
Sub Committee (HSC). They remain publicly accountable for the proper operation of the
harbour(s).   
Harbour authorities may entrust the operation of the harbour to professional people but board
members are accountable and may not abdicate that accountability on the grounds that they do
not have particular skills.  They retain strategic oversight and direction of all aspects of harbour
operations.  They must ensure that powers are discharged but not exceeded. 
Duties of a harbour authority include: 
▪ To take reasonable care that, so long as the harbours are open for public use, that all
who choose to navigate them may do so without danger to their lives or property;
▪ An obligation to conserve and facilitate the safe use of the harbours and a duty of care
against loss caused by the authority’s negligence.
▪ Developing policies, plans, systems and procedures for safe navigation
▪ Ensures assessments and reviews are undertaken to maintain and improve marine
safety.
▪ Ensure that the Harbour Authority seeks and adopts appropriate powers for the effective
enforcement of their regulations and for setting dues at a level which adequately
resources the discharge of all their duties, including conservancy.
▪ Approves and monitors the Marine Safety Plan. 
The authority has the power to appoint Harbourmasters who in turn have powers to direct the
operations of the ports so that they are carried out safely.  They may also authorise pilots.   
Page 25

Page 26

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 12 OF 75
ISSUE A REV 01.9 MARCH 2026 
Board members will make the time to gain an appropriate insight and understanding of the
port’s marine activities, marine safety management system and supporting systems. 
The duties and responsibilities of harbour authorities are set out more fully in the PMSC. 
1.5 Responsible Persons – Moray Harbours 
1.5.1 Duty Holder 
The Harbour Sub Committee (HSC) of Moray Council is the Duty Holder and makes up the
Harbour Board.   The Duty Holder will ensure: 
They are correctly trained to fulfil their role.
They are sufficiently familiar with the harbours to make strategic decisions concerning financing,
resourcing and strategic planning. 
The Harbours Service has sufficient resource to manage the legal duty to maintain the
Conservancy of the Harbours.
The Harbour Master has sufficient resource to ensure the harbours are operated in a
navigationally safe manner, maintaining marine safety, including the delegation of the powers of
Special Direction.
They approve the Marine Safety Management System
They approve the Marine Safety Plan, monitoring progress and reporting against the plan.
They approve the appointment of pilots.
They approve enforcement action. 
1.5.2      Head of Operations and Environment 
The Head of Operations and Environment is responsible and accountable to the board for
operational and financial control of the harbour authority. They advise the board on their powers
and duties with input from the Harbours Manager, Harbourmaster and other officers; they
oversee implementation of policy and decisions, has executive responsibility for safety of
operations and staffing, oversees recruitment and training.  The Head of Operations and
Environment can set additional commercial rates for the harbours, without recourse to the Duty
Holder to ensure operational flexibility. 
1.5.3     Service Manager, Harbours 
The Service Manager, Harbours reports to the Head of Operations and Environment on
strategic harbour matters. They conduct the internal auditing of the harbours with respect to
PMSC compliance and the reporting of KPIs against the Marine Safety Plan. They provide,
internal, specialist marine advise to the Duty Holder. They liaise with the community, business
and harbour users to develop and promote both the Marine Safety Plan and the Harbour
Business Plan for the harbours, to maximise the potential for the council and benefit to the
community. The Service Manager, Harbours provides line management and support to the
Harbour Master. 
1.5.4 Harbourmaster 
Page 26

Page 27

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 13 OF 75
ISSUE A REV 01.9 MARCH 2026 
The Harbourmaster is appointed by the Duty Holder to be responsible for the operational
aspects of the harbours, they are responsible for the safety of navigation in the various harbours
and for exercising the authority’s delegated powers in the ports and their approaches. 
Individually and via any staff, they are responsible for implementing powers of direction both
general and local. 
The Harbourmaster:
• Has powers of direction to regulate the time and manner of ships entry to, departure
from and movement within the harbour waters, and related marine safety purposes.
• Ensures co-ordination and regulation of all vessels within the harbour and its
approaches.  They are also responsible for developing and implementing emergency
plans and procedures, for regulating dangerous goods in transit on ships and for
counter-pollution and waste disposal plans. 
• Has overall responsibility for the provision and maintenance of  aids to navigation.
• Ensures harbour uses are aware of directions and regulations, including temporary
safety measures. 
• Has overall responsibility for the inspection, defect reporting and routine maintenance of
infrastructure for conservancy. Has overall responsibility for the training of pilots and the
conduct of safe pilotage. 
• Has overall responsibility of the training and competence of harbour staff in accordance
with the training matrix. 
The Harbourmaster is based at Buckie and is responsible for the commercial, operational and
safety management of all 6 Moray harbours.  There are two Assistant Harbourmasters – one
who deals with the leisure harbours and one who is focussed on the commercial harbours of
Buckie and Burghead.  The Assistant Harbour Masters cover for the Harbour Master when he is
away. The Harbourmaster supervises the harbour staff and reports to the Service Manager,
Harbours upon the status of operational harbour matters.   
1.5.5 Designated Person 
The Harbour Authority appoints a suitably qualified person to act as the Designated Person. 
This person’s function is to provide the Duty Holder with independent assurance that the
Harbour Safety Management System is working effectively and to audit compliance with the
PMSC. 
The Designated Person is appointed by the Head of Environmental & Commercial Services. 
They report periodically on the operation of the SMS to the Head of Environmental &
Commercial Services and thence to Harbour Sub Committee (HSC).  This role is currently
fulfilled by ABPmer. The Chair of the HSC and the Head of Operation and Environment are the
DPs dedicated point of contact. 
Page 27

Page 28

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 14 OF 75
ISSUE A REV 01.9 MARCH 2026 
1.6 Organisation Chart 
Page 28

Page 29

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 15 OF 75
ISSUE A REV 01.9 MARCH 2026 
1.7 Qualifications and Training 
The Moray Council maintains qualifications and training standards appropriate to the duties and
responsibilities of all personnel.  In the case of the Harbourmasters and harbour staff, these
include appropriate marine qualifications and experience.  The Harbourmaster, Harbours
Development and Operations Manager and Transportation Manager will set out the required
training. 
In house training is completed on subjects such as the Mooring Manual or emergency response. 
There is also a training package for pilots and coxswains to complete which is in line with the
training the National Occupational Standards and The Embarkation and Disembarkation of
Pilots Code of Safe Practice 2017. 
An electronic personnel training file is maintained at the Harbour Office for each person and with
the HR department in Elgin. Further training required will be scheduled or booked for the
person.   
Page 29

Page 30

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 16 OF 75
ISSUE A REV 01.9 MARCH 2026 
HARBOUR STAFF TRAINING REQUIREMENTS 
Staff PFSO Oil Spill
Response 
lvl 1
Oil Spill
Response
lvl 4
First Aid
Seagoing
VHF
Radio
Risk
Assess’t
&
Safety
Aware’s
Working
in or
near
Water
Manual
Handling
Local
Port
Services 
HM -
Buckie
X  X X X X X X X
Assistant 
HM – 
Commercial
X X  X X X X X X
Assistant 
HM – 
Leisure
X X  X X X X X X
Harbour
Assistant -
Buckie 
X  X X  X X X 
In addition, if in a sea going role, all harbour operational staff must have a valid ENG1 (medical fitness
certificate). 
Page 30

Page 31

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 17 OF 75
ISSUE A REV 01.9 MARCH 2026 
1.8    Document Control Procedures 
The Harbours Development and Operations Manager will issue numbered, controlled copies of
this document to essential users as listed on page 2.  They will initiate any required
amendments to this document and issue these amendments to registered holders.  Any
uncontrolled copies are only valid at time of issue for a specific operation.  Holders should check
with the local Harbourmaster to obtain updates. 
1.9        Review and Revision 
This document will be reviewed at regular intervals to ensure it remains current.   An interim
review will take place if there has been a significant change to operating parameters, legislation
or other matters addressed in the document.   The document will be reviewed yearly. 
The Harbours Manager is responsible for initiating and implementing reviews. 
Page 31

Page 32

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 18 OF 75
ISSUE A REV 01.9 MARCH 2026 
2 OVERVIEW OF THE HARBOURS 
2.1 Buckie 
2.1.1 Location and Layout 
The Harbour is in position 56º 41’N, 02º 57’W, on the southern shore of the Moray Firth.  It
contains 4 basins with quays. Normally, vessels up to 87 metres LOA and 15 metres beam can
be handled.    The basins are protected by the North Pier and a narrow NW-facing entrance. 
No1 Basin and the North Pier are used for cargo vessels loading/discharging bulk cargoes and
fabricated items, Basins 2 & 3 for fishing vessels and the Buckie Shipyard is in Basin No 4. 
Recreational craft and recreational fishing vessels are normally berthed in Basins 3 or 4. 
2.1.2 Operating Constraints 
Principal operating constraints are:
▪ Maximum LOA   90  metres
▪ Maximum beam    15  metres
▪ Maximum draft   4.5 metres (5.0 m on bigger tides to be discussed with
the Harbourmaster and subject to risk assessment) 
GREEN AMBER RED 
Vessels 0 ≥ 70 metres LOA  Vessels 70 -80 metres LOA  Vessels ≥ 80 metres LOA
• Max draft 4.5 metres
• Max beam 15 metres
• Max draft 4.5 Metres
• Max beam 15 Metres
• Must have operational
bow thruster
• Max draft 4.5 Metres
• Max beam 15 Metres
• Operational Bow
thruster
• Wind strength ≤ Force 4
• Entry prohibited if
significant sea/swell
from north or north-
east
• Visibility at least 1 mile
• Minimum 72 hours’
notice of arrival to
sufficiently clear No 1
Basin of other vessels
NOTE:
In Northerly winds of force 5 or greater and/or in visibility less than 0.5 NM, the harbour is likely to be
closed at Harbourmasters discretion. 
Vessels which do not meet the above parameters will be subject to prior Risk Assessment
involving Harbourmaster/Pilot and Master.  Constraints may include limitations on manoeuvring
timings relative to tide and daylight hour movements. 
Page 32

Page 33

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 19 OF 75
ISSUE A REV 01.9 MARCH 2026 
Vessels of exceptional size, configuration or draft, bound to or from the shipyard are subject to
an Unusual Event Risk Assessment.  Vessels with high windage deck loads or other
characteristics which adversely affect manoeuvrability are also subject to Unusual Event Risk
Assessment.   
In all cases, the Harbourmaster should be consulted. 
2.1.3 Port Control 
A LPS/VTS Formal Risk Assessment for Moray Council Harbours has designated a Local Port
Service, and the current harbour service manning is sufficient to provide this level of service.
Vessels entering and leaving Buckie are controlled by VHF radio – Ch 16 calling, Ch 12
working.  Approaching vessels have priority over those departing.   
Callsign for Buckie is ‘Buckie Harbour’ 
The harbour office and VHF radio are manned 24 hours per day.  The duty Watchman carries a
portable radio when temporarily away from the harbour office to allow communication with
vessels moving in the harbour. 
Vessels departing or moving through the harbour will get permission from port control before
letting go of any ropes. 
Port closure due to bad weather is signalled by three vertical red lights at the entrance. 
2.1.4  Port Limits 
Port limits are specified in the Schedule to Grampian Regional Council Harbours Byelaws 1990
and the Grampian Regional Council (Harbours) Order Conformation Act 1987.  In broad terms
harbour limits extend approximately 1,000 metres north, west and east of the harbour entrance. 
2.1.5    Approaches 
The approach to Buckie Harbour is relatively open from the north-west until passing The Mucks
– rocky shoals about 0.25 nautical miles north of the entrance.  The approach is covered by the
white sector of the shore light.  This, in line with the Occ (occulting) R (Red) Pierhead light
provides a clearing line of 125º/305º, west of The Mucks.  West Muck is marked by a light
beacon.   Buckie pilots recommend using the FR (Fixed Red) and Occ R lights on the North Pier
as a lead.  Red and green lights mark the extremities of the piers in the entrance.   
2.1.6 Anchorages 
There is an anchorage, for vessels able to use Buckie, one nautical mile North West of the
harbour entrance, clear of The Mucks, in depths of > 10 metres.   Harbourmaster’s advice
should be taken before anchoring.  The anchorage is not recommended in northerly gales. 
Page 33

Page 34

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 20 OF 75
ISSUE A REV 01.9 MARCH 2026 
2.1.7 Pilotage 
Buckie offers a pilotage service on demand, although it is not compulsory for any class of
vessel.  There are authorised pilots..  Commercial vessels should request a pilot at least 72
hours prior to arrival and departure, if unfamiliar with the port.   
The high speed pilot Boat allows boarding seaward of The Mucks.  The normal boarding area is
about one nautical mile north-north-west of the harbour entrance 
The Boat is crewed by harbour staff.   
2.1.8 Controlling Depths and Drafts       
A minimum keel clearance of 1 metre in the channel is recommended, subject to weather. 
The minimum depth below datum in the entrance channel is normally maintained at about 3
metres.  A depth of some 3.0 metres below datum is available in basins 1 2 and 3.  In basin No
4 the entrance depth of 2.0 metres shelves towards the shipyard slipways.    Rise of tide varies
between 3.2 metres at Neaps and 4.4 metres at Springs. 
The controlling depth is over the bank at the entrance.  Vessels up to 4.5 metres draft can be
handled on all tides; up to 5 metres draft on larger tides subject to risk assessment, if in doubt
ask the Harbourmaster or staff for advice.  Throughout the harbour vessels deeper than 2.5 – 3
metres take the ground at Low Water.  Deep drafted vessels bound for the shipyard are subject
to special arrangements and agreement between the Harbourmaster and Macduff Shipyards
management.  In case of disagreement, the Harbourmaster’s view prevails. 
The harbour entrance and bed are soft but silt up regularly.  Debris can be a problem,
particularly abandoned/lost tyres and various plastics (bottles, bags etc.).  The pilot Boat carries
out regular surveys. 
For all vessels with draft greater than 4.0 metres, the tide tables and latest channel survey must
be checked by harbour staff. 
Draft of deep drafted vessels sailing from the harbour must be checked by harbour staff to
confirm sufficient depth of water in the channel at time of exit. 
Vessels with draft deeper than about 2.5 metres in the harbour, take the ground at low water. 
2.1.9 Traffic and Trade 
2.1.9.1 Commercial Traffic 
Approximately 50 cargo vessels per year are handled at Buckie.  Cargoes include bulk
products, specialised loadouts of large or heavy items fabricated locally and occasional
shipments of timber.   Basin No 1 is generally kept clear for cargo vessels. 
Page 34

Page 35

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 21 OF 75
ISSUE A REV 01.9 MARCH 2026 
A variety of fishing boats, tugs, ferries and workboats are built and/or repaired at the Macduff
Shipyards buildings at the east end of the harbour.  Boats are lifted on one of 3 purpose built
boat lifters/slip ways and transferred to the work areas
Buckie harbour is operated as a temporary storage facility complying with the relevant UK
government requirements. The port utilises MCA approved software to monitor track and
authorise movements of cargo in compliance with the UK customs and Border force
requirements. 
Shipping agents should liaise with Harbourmaster to ensure all relevant documentation is
completed prior to vessels departing port of origin before passage to Buckie. 
2.1.9.2  Fishing Vessels 
There are a number of fishing vessels over 10m which operate from Buckie year-round -
although the number varies, it is on average 10 vessels. There are a smaller number of creel
boats. 
2.1.9.3 Recreational Craft 
A small number of recreational craft are based at Buckie including small passenger vessels.  30
– 60 passing yachts call at the harbour annually.     
Recreational craft and the creel boats are normally berthed in Basin No 4.   
An RNLI lifeboat is based in basin 4 at Buckie Harbour.  The RNLI have provided the harbour
with a pager, this allows the harbours team time to prepare for anything that may be required. 
The RNLI follow all the same procedures for entry/exit from the harbour as all other vessels,
however, their movements will take priority. 
2.1.10 Tides 
Rise of tide above datum is approx 4.4 metres at Springs and 3.2 metres at Neaps.  This allows
vessels up to 5.0 metres draft and exceptionally 6.0 metres to be handled.  Deep vessels take
the ground at low tide. 
Tidal heights are observed on the tide gauge and stonework of the North Pier. 
2.1.11 Currents 
Tidal streams along the Moray coast run generally east-west and do not exceed 0.6 knots. 
Currents are not significant when navigating into or out of Buckie. 
2.1.11.1 Wind and Wave 
Northerly gales and resultant swell make the entrance difficult and larger vessels are restricted
in those conditions.  Buckie is closed to vessels > 80 metres LOA in winds over Force 4 and/or
heavy swell from northerly or north-easterly directions.  It is closed to all vessels in winds over
Force 5.  Three vertical red lights indicate that the port is closed. 
Page 35

Page 36

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 22 OF 75
ISSUE A REV 01.9 MARCH 2026 
2.1.11.2 Visibility 
When visibility is or is forecast between 1.0 and 0.5 NM, Pilot/Duty Harbourmaster and vessel
Master will review whether it is safe for a commercial vessel to enter or leave harbour. The
Harbourmaster’s view will prevail in case of disagreement.  Entry/departure is not recommended
in poor visibility unless vessel has operating radar with short range settings. 
If visibility reduces to < 0.5 NM, movements in and out of the Buckie harbour is not
recommended except for fishing vessels and recreational craft with good local knowledge.   If
visibility falls below 50 metres, movements in/out and within either Buckie or Burghead
harbours, is not recommended.   
2.1.11.3 Ice 
Icing may occur within the harbour in extreme conditions, particularly in Basin No 4.  It may
cause problems for small craft. 
2.1.11.4 Environmental factors and SSSIs 
The entire Moray Coast is an environmentally sensitive area including: Special Areas of
Conservation (SAC), SSSIs and Special Protection Areas (SPA).  This is due to the resident
and visiting cetacean populations and a number of visiting and resident birds of European
Importance.   The sensitive areas are covered in detail in the Moray Coastal Pollution Plan.   
2.1.12     Navigation Aids 
Following aids are in use: 
• Light beacon on West Mucks rocks, north of the harbour
• Sector light behind the harbour which, in line with pier head occulting red light
provides a clearing line 125º/305º west of The Mucks; green sector marks the rocks
to the west of the entrance
• Fixed red and green lights marks the extremities of the piers at the entrance.  
Further information is in Section 10 (Aids to Navigation). 
The navigation aids are maintained by Moray Council staff.  West Mucks light beacon is solar
powered and the remainder by mains power.  All the aids conform with the criteria in the NLB
document “Instructions on the Provision and Maintenance of Aids to Navigation”. 
2.1.13 Deficient Vessels 
Based on Incident & Near Miss Reports the Harbourmasters keep a record in their logbooks of
vessels which, due to deficient performance, crewing or equipment increase the hazards of the
port or are otherwise unsuitable.  The harbourmasters will take appropriate steps to restrict the
operations of such vessels pending modifications or improvements.   Actions taken will be
recorded in the logbook. 
The Harbourmasters have powers to issue Special Directions in respect of specific vessels or
groups of vessels restricting their activities or requiring special provisions whenever such
Page 36

Page 37

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 23 OF 75
ISSUE A REV 01.9 MARCH 2026 
vessels use the ports.  Such Directions may include lightening, restrictions to daylight or certain
states of wind and/or tide – in extreme cases prohibition from the port. 
2.2 Burghead 
2.2.11 Location and Layout 
Burghead Harbour is located at 57º 42’ N, 03º 29’ W on the southern shore of the Moray Firth. 
The entrance faces SSW and is exposed to SW winds.  
The harbour consists of: 
▪ the entrance some 18 metres wide
▪ a spend and turning basin
▪ an inner basin, some 200 metres long with quays either side with widths varying
between 40 and 24 metres. 
2.2.12   Operating Constraints 
Draft is the principal constraint, although beam and length are also relevant, on which the
Harbourmaster should be consulted.  Draft is limited to the rise of tide less an allowance
depending upon the size of the vessel.  Rise of tide is some 3.3 metres at high water Neaps and
4.4 metres at Springs.  
The entrance channel is subject to silting depending on the weather and season.  There is a
channel suitable for fishing and recreational vessels with a minimum depth at about chart datum
along the North Pier.  Maximum draft of about 3.8 metres can be accepted at Spring tides and
2.7 metres at Neaps.  Any larger vessel movements should be planned on the basis of rise of
tide less 0.6 metres, in consultation with the Harbourmaster.  Depths between chart datum and
0.6 metres below datum are available in the Inner Basin.  Deeper vessels take the ground at low
water. 
The Harbourmaster at Buckie should be consulted for available depths. 
2.2.13 Port Control 
There is no port control at Burghead, vessel operators make their own weather decisions based
upon local knowledge. Following a formal Safety Assessment the current procedures in place
for Burghead are sufficient for the type of operation.  When larger vessels use the port they
should contact the Harbourmaster at Buckie by telephone to discuss the operation. 
Apart from such larger vessels, whose arrival is planned in advance, there is no active control
over navigation into and within the harbour.  The Harbourmaster visits the harbour daily and
maintains contact with users, allocating berths, dealing with any queries or problems which
occur.  Berths are arranged for regular vessels according to needs, priorities and availability. 
Space is normally available for visiting yachts, berth usage by recreational vessels is policed as
necessary. 
2.2.14 Port Limits 
Port limits are specified in the Schedule to Grampian Regional Council Harbours Byelaws 1990
and the Grampian Regional Council (Harbours) Order Conformation Act 1987.  In broad terms
Page 37

Page 38

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 24 OF 75
ISSUE A REV 01.9 MARCH 2026 
harbour limits extend approximately 500 metres south, west and north of the harbour entrance.
A navigational risk assessment control measure has been introduced limiting the maximum
length of vessel that can Burghead Harbour as 15m without the express permission from the
Harbour Master. 
2.2.15 Approaches 
Approach is from west-north-westerly directions towards the beacon passing close south of the
pier head where the harbour entrance opens.  From here, depths shoal rapidly eastwards to
where they dry out.   The actual alignment of the channel varies with silting, recent weather and
the season.  Local advice should be sought if depths are critical.   Once past the North Pier
beacon, the channel remains close to the pier and through the narrow entrance.  A 90º turn is
required on entering the spend basin. 
2.2.16     Anchorages 
Anchorage in depths > 10 metres is available 0.5 to 1.0 miles West of the pier head. Holding
ground is good. The anchorage is used principally by vessels which are bound elsewhere than
Burghead.  It not recommended when gales from between west and north are forecast. 
2.2.17   Pilotage at Burghead 
A Navigational Risk Assessment has been carried out for Burghead and there is no Pilotage
available for vessels entering Burghead. A navigational risk assessment control measure has
been introduced limiting the maximum length of vessel that can enter Burghead Harbour as
15m, without the express permission from the Harbour Master. 
The Harbourmaster is based at Buckie Harbour, can give advice on harbour entry and exit by
radio or telephone if requested. 
2.2.18 Controlling Depths and Drafts 
Depth in the entrance is maintained to about chart datum.  Rise of tide is between 3.3 metres at
high water Neaps and 4.4 metres at Springs.  Hence the controlling depth is the rise of tide plus
an allowance to give a bottom clearance in the entrance of at least 0.6 metres.  Lesser
clearances can be accepted for small vessels.   Within the basin depths between chart datum
and 0.6 metres below datum are generally available.  Deeper vessels take the ground – soft silt,
at low water.  In all cases, for advice on available depths, the Harbourmaster should be
consulted. 
2.2.19 Traffic and Trade 
2.2.19.1 Commercial Traffic 
There is no commercial trade to Burghead, the last cargo vessel having called in September
1999.   
2.2.19.2 Fishing Vessels 
Page 38

Page 39

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 25 OF 75
ISSUE A REV 01.9 MARCH 2026 
Up to 30 fishing vessels operate from Burghead year round and this increases during the
summer.  They catch prawns primarily but often move to squid during the summer and land
locally.    The authority prioritises facilities for fishing vessels.  There are other suitable harbours
nearby which offer extensive facilities for recreational craft. 
2.2.19.3 Recreational Craft 
There are about 15 locally based boats: part-time creel boats, yachts and launches.  A variety of
recreational craft use the harbour including about 30 visiting yachts per year.   
2.2.20 Environmental Factors 
2.2.20.1 Tides 
Rise of tide varies between 3.3 metres at Neaps and 4.4 at Springs. 
Painted boards form a tide gauge within the harbour. 
2.2.20.2 Currents 
Tidal streams along the Moray Coast generally run east-west and do not exceed 0.6 knots at
Springs.  Tidal currents are not a significant factor in operation of the port. 
2.2.20.3 Wind and Wave 
The entrance to Burghead faces just west of south and hence is sheltered from northerly winds. 
South-westerly gales affect the entrance. 
Northerly swells are refracted into the entrance and cause difficult surges in the spend basin. 
Sustained northerly gales are common in certain seasons. 
At Burghead there are no fixed parameters.  In the case of larger vessels, a decision is made
based upon judgement of conditions at the time.  Local fishermen are aware of the weather
induced hazards. 
2.2.20.4 Visibility 
Poor visibility occurs from time to time caused by fog (frontal & radiation), rain and snow
blizzards. 
2.2.20.5 Ice 
Due to its location, icing is rare at Burghead. 
2.2.20.6 SSSIs 
The entire Moray Coast is an environmentally sensitive area including: Special Areas of
Conservation (SAC), SSSIs and Special Protection Areas (SPA).  This is due to the resident
and visiting cetacean populations and a number of visiting and resident birds of European
Importance. 
Page 39

Page 40

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 26 OF 75
ISSUE A REV 01.9 MARCH 2026 
The sensitive areas are covered in detail in the Moray Coastal Pollution Plan.    
2.2.21     Navigation Aids 
An occulting white light is located at the south-western corner of the North Pier.  Red and green
lights mark the extremities of the North and South piers respectively either side of the entrance
channel.  The beacon on the southern extremity of the groyne on the east side of the channel is
marked by a flashing green light.  Further information is in Section 10 (Aids to Navigation). 
The Aids to Navigation are maintained by Moray Council staff.  All the aids conform with the
criteria in the NLB document “Instructions on the Provision and Maintenance of Aids to
Navigation”. 
2.3 Recreational Harbours 
These are at Hopeman, Findochty, Portknockie and Cullen.  There is no active management of
vessel movements.  There is heavy demand for recreational craft berths, with waiting lists for all
harbours.  The current waiting list can be found on the harbour noticeboard and in the Harbours
section of Moray Council website. 
There is no port control at Hopeman, Findochty, Portknockie and Cullen. Vessel operators make
their own weather decisions based upon local knowledge. Following a formal Safety
Assessment the current navigational management procedures in place for all Moray Council
Harbours are sufficient for the type of operation.  When larger vessels wish to utilise the ports
they should contact the Harbourmaster at Buckie by telephone to discuss the operation. 
Port Limits are established per the Schedule to Grampian Regional Council Harbours Byelaws
1990 and the Grampian regional Council (Harbours) Order conformation Act 1987.   
A Navigational Risk Assessment has been carried out for the Hopeman, Findochty, Portknockie
and Cullen and it has been assessed no pilotage service is offered at the recreational ports but
the Buckie Harbourmasters can provide advice if requested. 
A navigational risk assessment control measure has been introduced limiting the maximum
length of vessel that can access the Harbours of Hopeman, Findochty, Cullen and Portknockie
as 15m, without the express permission from the Harbour Master. 
Hopeman is used by over 100 craft including part time creel boats, yachts and launches.  A
sailing school is established there.  The entrance is exposed to the north-west and much of the
harbour dries out at low water.  Depths of at least 2 metres are available at high water and the
target depth in the channel when dredged is about one metre above chart datum.  Swell
dissipates in the outer spend basin.  The inner basin contains about 50 pontoon berths and 60
wall berths, the harbour is well sheltered.  Vessels arrive and leave at will when there is
sufficient water.  Leading lights can be seen lining up the harbour entrance.   The
Harbourmaster maintains contact with the regular users. Hopeman is managed from Buckie
Harbour Office 
Page 40

Page 41

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 27 OF 75
ISSUE A REV 01.9 MARCH 2026 
Findochty is a busy recreational harbour managed from Buckie.  The outer basin absorbs the
swells.  The Middle Pier protects the inner basin which includes pontoons, forming a marina. 
Almost 100 recreational craft are based there and more call there each year.  A few creel boats
are based at Findochty.  Regattas sometimes occur in the summer months and are planned in
advance.  Findochty Water Sports Club (FWSC) is based at the harbour and operates 2 rowing
boats which are launched several times a week and nearly always at the weekend, they enter
and exit the harbour frequently during that time. 
Most of the harbour dries out at low water. There is no active management of navigation and the
generally small vessels enter and leave at will, subject to weather conditions and available
water.  There are numerous rocky shoals in the approach from the north and the entrance is
exposed to gales and swell from the north and west quarters.  Leading lights can be seen lining
up the harbour entrance. The Harbourmaster maintains regular local contacts.  Findochty is
managed from Buckie Harbour Office. 
Portknockie is also exposed to the north-west, although the entrance is more sheltered.  3
pontoons are installed in the inner basin.  A number of yachts, launches and part time creel
boats(around 50) are based locally. Most of the harbour dries out at low water.  Vessels enter
and leave at will, subject to depths and weather.  Leading lights can be seen lining up the route
past the breakwater, when past the breakwater a 90° turn is made to Port for the harbour
entrance. The Harbourmaster maintains regular local contacts.  Portknockie is managed from
Buckie Harbour Office. 
The entrance to Cullen harbour faces west but the bay is exposed to northerly gales and swell. 
The outer spend basin contains little more than a beach and some quay space.  The inner basin
contains a pontoon for recreational craft.  Almost 30 yachts, small pleasure boats and part time
creel boats are based at Cullen and moor in the inner basin.  Most of the northerly swell
dissipates but some enters the inner basin.  Most of the entrance and harbour dry out at low
water.  Vessels enter and leave at will according to draft and weather.   Cullen Sea School is
operated from a building behind the harbour and part of the activities they offer is going out in
the rowing boat, using their paddle boards and kayaks.  The rowing boat is launched regularly,
usually at the weekend, and enters and exits the harbour frequently during that time but can be
launched at any time if they want.  A single sector navigation light opens up as the entrance to
the harbour becomes visible.  The Harbourmaster maintains regular local contacts.  Cullen is
managed from Buckie Harbour Office. 
2.4 Principal Hazards 
The principal hazards of the Moray Harbours are their exposure to northerly winds, sea and
swell and the resultant difficulties in entering the harbours.  The approach to some of the
harbours is made more hazardous by physical features such as rocky shoals in the approach
and narrow, shallow entrances. 
On fine days there is considerable small craft activity at the recreational harbours.  With visibility
partially obscured by the piers, there are risks of collision between small craft, but the
consequences are likely to be minor.  Jumping into the harbours from the piers remains a
popular local pastime, despite the risks.  One fatality occurred at Findochty in 2009.  Collision
between small craft and swimmers is reasonably foreseeable and the consequences could be
serious however, maintaining a sensible slow speed while transiting through the harbours will
minimise the risk
Page 41

Page 42

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 28 OF 75
ISSUE A REV 01.9 MARCH 2026 
Hence the principal risks are: 
▪ Commercial or fishing vessels grounding or foundering whilst trying to enter the harbours
in bad weather;
▪ Small craft grounding or foundering whilst trying to enter a harbour in bad weather with
the potential for loss of life;
▪ Collisions between small craft in the approaches or within the recreational harbours;
▪ Persons jumping into the harbours and misjudging either the depth or their trajectory;
▪ Personal injury due to a small craft running down a swimmer. 
These are reviewed generically in Section 3.10
Page 42

Page 43

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 29 OF 75
ISSUE A REV 01.9 MARCH 2026 
3 RISK MANAGEMENT 
Risk management is carried out integrally with the council's wider SMS, but is always done with
due regard to the specific hazards and risks of the marine environment. Moray Council as
harbour authority is committed to promoting a positive safety culture and managing a safe
operating environment. 
Health and Safety Policy Statement 
The following paragraphs set out the council's approach to risk assessment and risk
management, tailored for the marine environment. 
1. Introduction 
Risk assessment is the basis on which you decide how you will act in any given situation. 
Hazards and risks are present in all walks of life.  At work, we now have a specific duty to
define the hazards to which people are exposed and assess the risks they pose.  We do
this taking into account any legal requirements, which relate to the hazards in question. 
2. Purpose 
2.1 To define how we handle our risk assessment duties under various pieces of legislation. 
3. Scope 
3.1 All known hazards to Health and Safety created by or during our operations or those of
other people, both to our own employees and to other people. 
4. Responsibilities 
4.1 -- Managers - Ensure that risk assessments are carried out and that action is taken to
eliminate or control significant risks.  Also to review the assessments as necessary. 
4.2 Risk Assessors - Will carry out the risk assessments to the best of their abilities. 
4.3 All Employees - To assist in the risk assessment process and comment on its adequacy. 
4.4 Contractors - To carry out their own assessments in consultation with Moray Council,
detailing how their work may affect the employees and how we may affect them. 
4.5 Clients - To give contractors information to enable them to comply with the above. 
4.6 Senior Health and Safety Adviser - To devise an appropriate system for risk
assessment, train people in its use, give advice and support during the process of risk
assessment and monitor its effectiveness. 
5. Procedure 
Page 43

Page 44

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 30 OF 75
ISSUE A REV 01.9 MARCH 2026 
5.1 A suitable and sufficient risk assessment must be carried out on all jobs within the Council. 
The risk assessment will be either job based or task based dependent on the type of work
being assessed.  It should also be considered that before a new project is undertaken, a
risk study can be carried out to look at the potential risks and actions needed to design
them out. 
5.2 The risk assessments are best carried out by a team consisting of a management
representative, a safety representative and a person carrying out the job with input from
the health and safety section as required. 
5.3 If the job involves contractors the duty rests with all concerned to co-operate in carrying
out the assessment, and to co-ordinate the activities which arise from it. 
5.4 A risk assessment should contain the following elements :- 
a) A breakdown of the job into its main parts.  (SMS Form 8.3) and a detailed look at
each task in relationship to a standard list of hazards and hazardous tasks.     
b) A record of the assessment, held in the harbour office  (SMS Form 8.4) giving :-   
i)  details of hazards encountered
ii)  their current control, if any. 
iii)  the magnitude of risk they pose (using a system where probability and
severity are given a numeric value and then combined to give a risk rating). 
iv)  comment on additional controls as necessary. 
A simple guide has been produced for new users of the system. (SMS GN 7.22) 
5.5 Once the general risk assessment is complete, it must be passed to all people in the area
and also to the area management and safety representatives.  They will be given the
opportunity to comment on the assessment and whether all hazards in the area have been
adequately covered.  All comments must be fed back to the risk assessment team. 
5.6 For certain activities, it is appreciated that the same risks are being faced in a multitude of
different areas.  In these situations the principle of generic assessment will be used to
make the task of assessment more manageable.  This must be done with great care to
ensure that no specific area hazards are missed. Generic assessments must be tailored
when being applied to different areas, to pick up these differences. 
5.7 More detailed assessment of certain types of hazard will be required in some situations. 
Please refer to the specific procedures for more detail.  This includes manual handling,
chemicals, noise, fire and display screen equipment (DSE) use. 
5.8 The assessment should be used as a means of prioritising the action within departments
to ensure people's health and safety.  A plan of action should arise from the assessment
with the highest scoring items being addressed first. 
5.9  The points raised in an assessment must be addressed in one of the following ways. 
ELIMINATE  the hazard 
SUBSTITUTE  for a lesser hazard
Page 44

Page 45

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 31 OF 75
ISSUE A REV 01.9 MARCH 2026 
CONTROL  the hazard (e.g. by things such as guarding, safe systems of work,
information, training or supervision and finally personal protective
equipment). 
RETAIN     agree that the hazard is not significant or is acceptable in the given
situation. 
5.10 A final assessment must be made once the measures agreed on are implemented and the
residual risk assessed and defined. 
5.11  All risk assessments must be reviewed on an agreed frequency or if circumstances in an
area change.  If an accident or dangerous occurrence happens in the area covered by an
assessment, it must be reviewed to find out why the hazard leading to the incident was not
adequately controlled and whether the assessment findings are valid. Any changes
necessary must be made and further control measures implemented. 
6. Definitions 
Hazard     Something with the potential to cause harm. 
Risk                   The likelihood of that harm occurring taking into account probability and
severity. 
7. Tool Box Talks 
A Tool Box Talk is a simple, informal risk assessment carried out by the personnel
involved.  It ensures that the task and its potential hazards are understood, that correct and
adequate equipment is in place, that personnel understand their responsibilities and that
contingency plans have been discussed and are understood. 
All routine operations involving potential hazards should be preceded by a Tool Box Talk. 
Such routine operations may include: 
▪ mooring/unmooring operations,
▪ harbour launch operations, 
▪ pilot Boat operations,
▪ Aid to Navigation maintenance, 
▪ manoeuvring large vessels in and out of the harbours
▪ unusual quayside operations
▪ before each shift of an exceptional hazardous operation which has undergone risk
assessment.   
The particular task leader is responsible for implementing tool box talks. 
At the end of each task, a debrief will be held with all those who took part in the task. 
During the debrief, questions such as ‘What went well and what didn’t go so well?’ should
be asked so that any lessons learned are captured and communicated to others. 
8. Unusual/Exceptional Operations 
Page 45

Page 46

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 32 OF 75
ISSUE A REV 01.9 MARCH 2026 
All and any non-routine operations should be subjected to a Risk Assessment.  Depending
upon the potential hazards and complexity of the task it can vary from a simple tool box talk
to a formal Risk Assessment Workshop.  The fact that a risk assessment has been carried
out and its conclusions will be recorded in appropriate detail, in the harbour logbook. 
Examples of such unusual operations include:
▪ Vessels of unusual size or configuration
▪ Dredging
▪ Diving
▪ Refloating a grounded/stranded vessel
▪ Vessel towage
▪ Salvage
▪ Removal of derelicts. 
9. Contractor Compliance 
External contractors and agencies that utilise the port facilities are required to comply with
local health and safety directives and all statutory health and safety regulations.  As such,
all vendors must comply with Moray Council’s third party acceptance checks and submit a
signed letter of conformation confirming their commitment to carry out all port operations in
a safe and efficient manner, in line with local and statutory regulations.
10. Generic Review of Hazards 
No Hazard Potential
Causes
Risks Risk Level  Control Measures
1 Fire &
Explosion
Vessel
collisions. 
Handling fuel
(rec. craft) 
Handling gas
bottles (rec. &
fishing vessels) 
Personal
injury or
death. 
Harbour
closed or
obstructed
Moderate
To 
Substantial
Commercial &
fishing vessels use
diesel. 
Small quantities
petrol & gas.
2 Grounding
Stranding
Unexpected
shoaling.
Loss of power.
Loss of control
in onshore (Nly)
gales. 
Crew error
Vessel
damage. 
Loss of life. 
Harbour
blocked. 
Adverse
publicity.
Tolerable
To
Moderate 
Local knowledge. 
Published advice &
recommended
routes. 
Awareness and
caution.
3 Collision  -
Commerci
al
harbours
Mechanical
failure. 
Crew error. 
Vessel
damage. 
Pollution.
Tolerable Low traffic levels. 
Local knowledge
or advice from
harbour staff/pilot
Page 46

Page 47

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 33 OF 75
ISSUE A REV 01.9 MARCH 2026 
4 Collision  -
Recreatio
nal
harbours
Poor visibility
around piers. 
Crew error. 
Running down
swimmer.
Vessel
damage
(minor). 
Loss of life. 
Adverse
publicity.
Trivial
To
Tolerable 
Speed limits. 
Harbourmasters
follow up with
irresponsible boat
operators. 
5 Pollution Fuelling
vessels. 
Pumping bilges. 
Vessel damage. 
Crew error.
Environmenta
l damage. 
Slippery
ladders and
potential
drowning. 
Injury to
personnel 
Adverse
publicity
Moderate
To
Substantial
Enforce bunkering
procedures.
Encourage oilsorb
in FV bilges.
Response
equipment
available.
Waste Oil
collection point at
office
Staff training on
pollution response
Good
housekeeping
maintained 
6 Personal
injury.
Line handling. 
Harbour/Pilot
launch
operations. 
Crew/operator
error. 
Public access/
jumping into
harbours.
Loss of life. 
Drowning. 
Serious injury 
Adverse
publicity.
Tolerable 
To 
Substantial 
Tool box talks. 
Suitable training
with staff
Awareness &
caution.
Youth and visitor
education on
hazards of
harbours.
Enforce byelaws.
PPE. 
Page 47

Page 48

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 34 OF 75
ISSUE A REV 01.9 MARCH 2026 
4 EMERGENCY RESPONSE PROCEDURES 
4.1 Relevant Emergency Response Plans 
Working in Partnership
The foundation of emergency planning is cooperation between partners.  The Grampian Local
Resilience Partnership (LRP) is the local forum for emergency planning and includes Police,
Fire, Ambulance, HM Coastguard, SEPA, NHS, Moray, Aberdeen City and Aberdeenshire
Councils. Grampian LRP is part of the North of Scotland Regional Resilience Partnership
(NSRRP). 
The LRP aims to maintain effective local liaison and co-ordination, through developing and
managing a local work program.  Resilience Partnerships aim to protect the people,
economy and environment by building resilience and having effective arrangements in place to
deal with emergencies.  Resilience Partnerships work closely with the Scottish Government,
other Scottish Resilience Partnerships and specialist advisors in responding proportionately to
emergencies, minimizing their impact and promoting recover
y as quickly as possible. 
Emergency Planning in Moray  
An Emergency Planning Officer is based in Elgin.  Via the emergency on call procedures the
council provides a 24hr 365 days a year, first line of Council response, for any major emergency
involving the council as a Tier 1 responder.
As emergency situations arise, other Council officers are brought in to co-ordinate the Council’s
response and to provide expert advice and assistance.  The arrangements detailing the
Council’s response to the effects of major emergencies whatever their cause is contained within
the Emergency Planning Policy and Procedures.  
http://www.moray.gov.uk/downloads/file86131.pdf
Oil Pollution Arrangements
In addition to the general arrangements contained in the Emergency Planning, Policy and
Procedures document, a plan detailing specific arrangements to deal with pollution of the moray
coastline, including the Buckie and Burghead Harbours has been prepared.  A copy is held by
the Harbourmaster. 
Copies of relevant plans are maintained at individual Harbour Offices.   
All spill kit equipment can be found in the harbour stores.  Buckie - in the Fishmarket and
Burghead - underneath the office.  If the incident occurred at a recreational harbour then
equipment will be used from these sites. 
4.2 Review and Updates 
These plans are reviewed for currency at regular intervals, normally between one and three
years.   
Grampian Emergency Planning Unit issue updates. 
Page 48

Page 49

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 35 OF 75
ISSUE A REV 01.9 MARCH 2026 
4.3 Exercise and Drills 
All harbour staff shall review the plans periodically and be familiar with their layout and content. 
Desk-top and hands-on exercise will be arranged based on the various Emergency Plans. The
Harbourmaster will maintain a log of all the drills and exercises carried out. 
4.4 Dangerous Vessels and Civil Contingency 
Moray Council as Statutory Harbour Authority for the six harbours is a category 2 ‘cooperating
body’ with specific defined roles in the event of incidents that affect the Harbour.  Moray Council
shares relevant information with category 1 bodies (emergency services and local authorities),
and other category 2 responders, as necessary.  Details of the port’s emergency plans are
contained in the ‘Port Emergency Plan’ and associated documents.   
The Harbour Master may give direction (see Section 1 – Byelaws and Powers) prohibiting the
entry into, or requiring the removal from the Harbour of any vessel if, in their opinion, the
condition of the vessel or the nature of anything it contains, presents a grave and imminent
danger to the safety of persons or property.  This includes the risk of sinking or foundering in the
Harbour, or preventing or seriously prejudicing the use of the Harbour by other vessels.  Such
directions may be overridden by the SOSREP who may issue contrary directions to the Harbour
Master.   
A Harbour Master also has powers to prohibit the entry into the Harbours of any vessels
carrying dangerous goods, if the condition of the goods or packaging, or the vessel carrying
them is such that it creates a risk to health and safety.  These powers are conveyed by the
‘Dangerous Goods in Harbour Areas Regulations 2016’.  Harbour Authorities have a duty to
prepare emergency plans for dealing with dangerous substances.  
Page 49

Page 50

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 36 OF 75
ISSUE A REV 01.9 MARCH 2026 
5 PERFORMANCE MONITORING 
5.1 Periodic Review and Reporting 
a) Incident and Near Miss Reports are reviewed periodically to identify any trends of
concern and to focus on necessary safety improvements.
b) The logbook records plus Incident and Near Miss Analysis will be reviewed and
analysed at regular intervals, normally annually.  Trends and proposed improvement
actions will be identified.  The Harbourmaster will report on these topics to the Harbour
Development and Operations Manager and thence to the Chief Executive. 
c) The periodic analysis of Incidents and Near Misses, trends and proposed actions will be
made available to harbour staff and users. 
5.2 Auditing 
Internally the Safety Management System will be audited by a suitably qualified person who will
then report to the Duty Holder on the effectiveness and performance of the system.
The Designated Person will audit the Safety Management System at least once every 3 years. 
Page 50

Page 51

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 37 OF 75
ISSUE A REV 01.9 MARCH 2026 
6 HANDLING OF DANGEROUS GOODS 
Under the Dangerous Goods in Harbour Areas Regulations, vessels intending to use the port
that have DGs onboard either for discharge or remaining in transit must advise the
Harbourmaster of details 24 hours before arrival.  This will be done in writing or if agreed with
the Harbourmaster, another form of communication such as email.
The Harbourmaster will decide where the vessel will be berthed after taking into consideration
the cargo and how it may affect other vessels in the area.  The emergency plans for the area
should be reviewed and an amendment made if it is required.  Depending on the potential out
come should there be an incident with the substance; local emergency services will be
informed.   
Gas cylinders and small quantities of flammable liquids are handled onto and off fishing and
recreational vessels at all the harbours.  Harbour staff must encourage vessel operators to take
proper precautions when so doing.  Neither empty nor full containers will be left unattended on
the quays.   
High flash-point oil fuel is handled at all the harbours from road tank wagons.  Pollution due to
spillage is the principal risk from such operations.   Bunkering Checklist is part of Risk
Assessment 18. 
Importing of DG’s into the harbours is rare.  Occasional containers of high flash point oil
products are received at Buckie.
If there are any DG’s which have to be stored on the quayside, either for import or export, then
the Harbourmaster will dedicate an appropriate area as a Dangerous Goods Bay after
consulting the storage guidelines on the SDS.  This bay will be cordoned off.  If there are 2 or
more types of chemicals then all the storage guidelines will be consulted and the compatibility
chart below will be used to ensure that there are no incompatible chemicals being stored
together.  Refer to Appendix G
Page 51

Page 52

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 38 OF 75
ISSUE A REV 01.9 MARCH 2026 
7 INTERNATIONAL SHIP AND PORT FACILITY SECURITY CODE (ISPS) 
Buckie handles international commercial vessels and hence is subject to ISPS.  This requires a
Port Facility Security Plan, duly trained Security Officers, and Security Declarations by arriving
vessels on international voyages and restricted access to the quayside for such vessels,
including a pass system.   The Harbourmaster and Deputy Harbourmaster will normally be the
designated Security Officers and are responsible for implementation of the Code according to
guidance issued by Department for Transport (
DfT). 
Page 52

Page 53

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 39 OF 75
ISSUE A REV 01.9 MARCH 2026 
8 PORT WASTE RECEPTION FACILITIES REGULATIONS 2003 
All Moray Harbours are subject to these regulations with an emphasis on Buckie and Burghead
being commercial harbours this requires: 
▪ the reporting, documentation and correct disposal of ship generated waste;
▪ a published charging regime.   
The Consolidated European Reporting System for ship’s waste also applies to certain vessels
visiting Buckie. 
Before entry into the harbour, as part of the pre-arrival documentation, all cargo vessels will
have already provided the port with the waste figures.  The paperwork should arrive 24 hours
prior.  All other vessels use the general waste bins at the recreational harbours or if at Buckie or
Burghead , the recycling bins which are available.  Waste oil collection is also carried out at
Buckie and Burghead.  Any waste will be segregated and dealt with in accordance to Moray
Council’s Harbours Waste Plan. 
9 Conservancy 
9.1 Shoaling 
The entrances to all the harbours – commercial and recreational silt regularly. Depths are
surveyed regularly and dredged as outlined below. 
9.2 Surveys 
Harbour beds and approaches will be surveyed at least annually for the commercial harbours
two yearly for the recreational harbours.  Intermediate surveys may be carried out after major
storms if significant changes are suspected.   
Level surveys are carried out in areas which dry out at low water.  Areas not accessible on foot
are surveyed by echo sounder mounted on the Buckie pilot Boat.   
Echo sounder records have an accuracy of +/- 0.2 metres and the level surveys +/- 0.1 metres. 
Results of surveys are plotted on 1:500 charts which are available at harbour offices and the
Roads Office at Elgin. 
Any hazards noted are promulgated via local notices to mariners and/or via UKHO. 
9.3 Inspections 
Harbour fittings and equipment will be inspected:
▪ Weekly by harbour staff;
▪ Annually at random by Moray Council Safety Officer;
▪ Annually by a Council Engineer or Civil Engineer and divers. 
Weekly inspections follow separate lists for the commercial and recreational harbours. 
Similarly, separate report forms are submitted by the harbourmasters to the Harbours
Development and Operations Manager.  Any serious deficiencies must be reported immediately
through the Harbour Asset Management System WDM.   
Page 53

Page 54

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 40 OF 75
ISSUE A REV 01.9 MARCH 2026 
Annual safety inspections can cover any aspect of the harbours including condition of quays,
fixings, equipment facilities or the operation of the harbour.  Any items for improvement or
remedial action are reported to the Civil Engineering Technician and recorded through the
Harbour Asset Management System WDM. 
Annual formal inspections cover accessible areas above MHWS.  The complementary diving
inspection covers authority facilities below MHWS.  Defects and obstructions are reported and
plotted on a 1:500 chart, using photographs if appropriate.  Urgent defects are reported to the
responsible harbourmaster or Harbours Development and Operations Manager. 
Additionally, steel ladders are inspected bi-annually at Low Water Springs, for safety and
general condition.  Any necessary repairs are actioned by the Harbours Development and
Operations Manager.  A plan showing the positions of all ladders at each harbour is maintained. 
Bi-annual inspection of lighting & electrical fittings by the Lighting Section of Roads Services
includes navigation lights, pier lights and power boxes. 
9.4 Dredging 
The Harbour Authority carries out maintenance dredging of the harbour basins and identified
high spots in the approaches to maintain target depths.  Frequency depends upon need, survey
results and availability of Moray Council owned dredger “Selkie”.   The frequencies are
approximate: 
• Buckie   Entrance annually, other areas as required
• Burghead   Entrance as required when dredger is available, basin,
infrequently
• Recreational Harbours As required 
Any dredging operation is considered to be an unusual event and hence is subject to a prior
Risk Assessment involving the dredger skipper and Harbourmaster.  See Section 5.4 of this
appendix. 
Any capital dredging to improve the channels or increase the controlling depths would be a
special project requiring:
• Justification based upon need and detailed hydrographic survey
• Approval of the Crown Estates
• Risk Assessment - particularly in respect of traffic movements during the project
• Determination of whether an Environmental Impact Assessment is required under the
Harbour Works (EIA) Regulations 1999.
• Approval of capital expenditure 
If spoil is to be disposed of in tidal waters consent is required from Scottish Government.  If
disposal is at sea a license is required from Marine Scotland. 
Any dredging contractor operating within the Moray Harbours will be required to:
• Demonstrate its experience and competence for the particular project;
• Employ personnel who are properly qualified, experienced and trained for the type of
project;
Page 54

Page 55

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 41 OF 75
ISSUE A REV 01.9 MARCH 2026 
• Operate a risk based safety management system. 
Before any dredging operation, the Harbourmaster and Dredger Master will:
• Carry out a risk assessment of the operation;
• Develop any necessary special harbour procedures for the duration of the operation,
these must address the question of vessels manoeuvring in the vicinity of the dredger;
• Issue necessary warnings and notices. 
9.5 Wrecks 
Under general powers and specific powers in the byelaws, the Harbourmasters may order or
arrange the removal of any wreck, abandoned vessel or other derelict obstructing the navigable
channels or other public areas of the harbours.  The wreck location may be marked until it is
raised, removed or destroyed.  The authority has general powers under the 1987 GRC
Confirmation Order and harbourmasters have specific powers under the Byelaws. 
Harbour staff will try to identify the owners of any such derelict and require them to arrange
removal.  If ownership cannot be established in a reasonable period, or if the derelict is
seriously impeding traffic, the authority may arrange removal. 
Harbour staff will ensure that any such operation is properly planned taking account of safety,
the environment, traffic and recreational aspects.  Any contractors must operate under a risk
based Safety Management System. The operation will be subject to an unusual event Risk
Assessment involving all concerned parties. 
9.6 Mooring/Unmooring 
Mooring and unmooring of commercial vessels at Buckie is normally carried out by the duty
Watchman.   Fishing vessels normally handle their own mooring lines but may request
assistance. 
Operators of craft at the recreational harbours are responsible for handling their own moorings
and any issues with the mooring arrangements noted while carrying out harbour checks will be
communicated to the boat owner for rectification. 
Harbour staff employed in mooring/unmooring operations will wear appropriate Personal
Protective Equipment (PPE), as per the Mooring Manual.  They should set a good example to
others so employed.  The Harbourmasters are responsible for implementing this policy and for
the safety of harbour personnel.  Staff should ensure that members of the public and other
personnel keep a safe distance from the mooring/unmooring operations at the commercial
harbours.  All harbour staff complete the Mooring Manual training
.
Procedures including safety and PPE standards are contained in Appendix D, Section 1.   
9.7 Towage 
No routine towage services are available at the Moray Harbours.  The commercial and fishing
vessels visiting the harbours are equipped with bow thrusters or are otherwise able to
Page 55

Page 56

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 42 OF 75
ISSUE A REV 01.9 MARCH 2026 
manoeuvre adequately.  The Buckie work Boat may be used to assist in berthing/unberthing a
vessel. 
Any tugs of more than 5 tonnes gross operating in harbour areas must be licensed by the
Harbour Authority.  No such tugs currently operate. 
Any towage for specific purposes, to assist an unusual vessel/craft or to assist a disabled or
grounded vessel will be planned with the Harbourmaster in advance.  It will be subject to an
unusual event Risk Assessment involving concerned personnel.  Any additional control
measures indicated by the risk assessment must be implemented.  The contractor must satisfy
the Harbourmaster that the proposed towage vessel:
• Is of sufficient power and manoeuvrability for the vessel to be assisted and the confines
of the
•  harbour
• Is adequately and competently manned
• Has all critical equipment operational
• Is operated in accordance with a risk based safety management system, either formal
or specific to the operation. 
If the towage vessel is unsuitable for these or other reasons, then operations will not proceed
until suitable arrangements are in place. 
9.8 Salvage 
Any salvage operations within the Moray Harbours must be carried out by a competent
contractor, operating a risk based safety management system. 
A formal risk assessment is required prior to commencing the operation.  Any specific controls
or risk reduction measures identified as being necessary must be implemented.  Tool box talks
are essential before each shift or phase of the operation.   
Procedures for the operation must be produced by the contractor and cover:
• Methodology;
• Required equipment and personnel;
• Exclusions/limitations on other harbour activities;
• Other risk reduction and control measures required;
• Parameters for suspending and aborting the operation;
• Contingency plans. 
Harbourmasters will implement necessary and appropriate exclusion zones whilst the operation
is being carried out.  Other users should be kept advised of progress for any salvage
operations. 
9.9 Diving (Harbour Works and Vessels)
The Authority has a responsibility to ensure that any diving works within the Harbour Area is
carried out safely, by competent divers, in accordance with HSE Guidance. 
Recreational diving and swimming is regulated by the Byelaws. 
Page 56

Page 57

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 43 OF 75
ISSUE A REV 01.9 MARCH 2026 
Any diving works on behalf of Moray Council will be carried out by competent diving contractors,
operating a risk based safety management system, requires a Permit to Work and must be
carried out in line with a bespoke risk assessment and method statement for the activity. 
“Diving Operations in and around Moray Council Controlled Waters/Sites/Installations”. 
Contractors must provide evidence of their competence and SMS at the time of tendering. 
Refer to the above Safety Procedure. 
Any required diving on vessels within the Harbours must also be carried out by a competent
diving contractor or otherwise be in compliance with HSE Guidance for Diving on Fishing
Vessels.  No such diving may take place without prior consultation with the Harbourmaster. 
In general, for any diving operations:
• The diving system/vessel must be properly equipped and manned;
• Weather and tidal conditions must be suitable;
• Necessary warnings must be displayed and broadcast;
• Other vessels, vehicles and persons not involved in the operation must be kept at a safe
distance;
• Diving must be suspended when there are increased risks from passing vessels or other
activities in the harbour, or when other conditions change significantly;
• Is subject to a Diving Permit (see the Direct Services Diving Safety Procedure) and a
harbour permit to work 
The Harbourmaster may order the cessation of diving if any of the above are not met or the
operation appears otherwise unsafe. 
9.10  Navigational Warnings 
If Moray Council (Harbour Authority) become aware of any navigational hazard that is not
present on marine charts or other published navigational information, it will, having verified any
reports, publish a suitable warning through the use of a Local Notice to Mariners.  The Notice to
Mariners must be appropriate to the hazard and distributed accordingly.  Such navigational
warnings may include (but are not limited to) –
• Adverse Weather Conditions
• Shipping movements
• Changes in charted depths
• Damaged or malfunctioning AtoN
• Wrecks or abandoned vessels
• New or temporary exclusion zones
• Works in harbour area
• Miscellaneous safety warnings.
If the navigational hazard is not of a temporary nature, changes to nautical charts and published
information will be made if considered necessary by the UK Hydrographic Office.
Tide tables are posted in the noticeboards at all the harbours.
Page 57

Page 58

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 44 OF 75
ISSUE A REV 01.9 MARCH 2026 
10. AIDS TO NAVIGATION 
10.1 Procedures 
The Authority maintains a suite of navigation aids, listed below, to mark the harbour entrances
and in some cases hazards in the approach.  The General Lighthouse Authority – Northern
Lighthouse Board sets standards for aids to navigation and must be kept advised of any defects
to the principal ones. These meet criteria set in the NLB document “Instructions on the Provision
and Maintenance of Aids to Navigation”.  Navigation lights at Cullen, Findochty and Portknockie
are for local assistance.  None the less, they are included in the report to NLB.   
As a competent harbour authority, Moray Council acts as a local lighthouse authority, and
therefore has responsibility for the provision and proper maintenance of aids to navigation as
necessary, and effective management of any danger to navigation from wrecks or obstructions. 
Maintenance of all Aids to Navigation is carried out by authority staff.   
Harbour staff inspect navigation lights for operation at least weekly.  At Buckie, the Watchman
confirms operation each night.  Any defects are advised immediately to the Streetlighting team
in Elgin for action and reported through the Harbour Asset Management System WDM.  At
Buckie and Burghead, any relevant defects are advised to vessels in port.  Availability reports
are prepared and forwarded by the Harbourmaster then submitted through the online report
form to NLB. 
All local lighthouse authorities – including harbour authorities which maintain navigation aids,
are required to report annually to NLB.  The report covers the status and downtime of the aids
and is submitted via email once generated from the AtoN online system.  Refer to NLB
document “Instructions on the Provision and Maintenance of Aids to Navigation”. 
10.2 List of Navigation Aids   
(i) Buckie 
▪ Qk Fl R 5 sec, 5m 7M  Marking West Muck rocks  
▪ Iso WG 2 sec 20 m 16/12M White light, in line with the North Pier light provides a
clearing line 125º/305º, west of The Mucks;
Green sector marks the rocks to the west of the Entrance; 
▪ Occ R 10s 15m 15M   North Pier 
(ii) Burghead 
• Occ 8 sec 7m 5M   South-western corner of the North Pier
• Qk Fl R 3m 5M   Extremity of the North Pier and channel
• Qk Fl G 3m 5M   Extremity of South Pier and channel  
• Fl G 5 sec 2m 1M   Southern extremity of groyne, east side of the channel
(iii) Hopeman 
• Occ G 4s 8m 4M   North-west corner of the West Pier
• FR 3 & 4m    Leading lights marking the entrance channel  081º.
Page 58

Page 59

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 45 OF 75
ISSUE A REV 01.9 MARCH 2026 
(iv) Findochty 
• Unlit beacon on the north-west corner of the West Pier.  
• Fixed red leading lights marking the approach channel.  
(v) Portknockie 
• Flashing green leading lights marking the approach channel. 
(vi) Cullen 
• Unlit beacon on the south-west corner of the North Pier.  
• Flashing green light marking the entrance channel. 
11 PILOTAGE 
11.1 Pilotage Act 
Under the provisions of the Pilotage Act 1987, Moray Council is the Competent Harbour
Authority for the provision of pilotage services within the Moray Council SHAs.  This requires
Moray Council to ‘keep under consideration’ the pilotage services that need to be provided to
secure the safe navigation of ships in the harbour and its approaches. 
The following aspects are subject to regular review: 
• Whether pilotage should be compulsory, and if so, for what classes of ships;
• The qualifications and number of people to be authorised as pilots within the area of
jurisdiction;
• The training and regulation of authorised pilots;
• The provision of pilot boats to the approved standard;
• The granting of ‘Pilotage Exemption Certificates’ to bona fide Masters and/or First
Officers of ships which regularly call at the port; and
• The charges to be levied for the provision of the Pilotage Service.  
Statute law defines a pilot as ‘any person not belonging to a ship who has the conduct thereof’
but the pilot does not assume the role of the Master and the fact that a ship is being navigated
in an area that requires compulsory pilotage shall not affect any liability of the owner or Master
for any loss or damage caused by the ship or by the manner in which it is being navigated 
11.2 Pilotage Limitation of Liability  
A Harbour Authority’s pilotage liability is governed by section 22 of the Pilotage Act 1987.  This
does not entitle a person to limit their liability if it is proved that the loss resulted from their
personal acts or omission, committed with the intent to cause such a loss, or recklessly and with
the knowledge that such loss would probably be the result.  There is a limitation of liability in the
charge of pilot’s negligence, which is currently £1,000, plus the pilotage fee for the voyage in
question.  For a Competent Harbour Authority the amount is £1,000 multiplied by the number of
Pilots authorised for that district.
Page 59

Page 60

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 46 OF 75
ISSUE A REV 01.9 MARCH 2026 
11.3 Pilot Conduct 
Each Pilot is directly responsible to the Harbour Authority for the provision of pilotage and
related services concerned with the safe movement of vessels in the compulsory pilotage area. 
The Harbour Authority determines the qualifications for authorisation as a pilot for Buckie
Harbour in respect of fitness, time served, local knowledge, skill and any other stipulation
thought necessary.  The Harbour Authority may revoke or suspend pilotage duties if it appears
the Pilot is incompetent, has failed to carry out his/her duty through misconduct, or has failed to
continue holding the required qualifications of the post.   
11.4 Pilotage Assessment 
Moray Council Harbours offers non compulsory pilotage for the harbours. Following a
Navigational Risk Assessment of all six (6) harbours, Moray Council deems the Buckie Harbour
to be on the only harbour that requires a pilotage service due to the complexity of the harbour.
For the Harbours of Burghead, Cullen, Findochty, Hopemen, Portknockie no Pilotage offered
following formal risk assessment, and limitations of vessel size up to 15m LOA is accepted
within the harbours, unless express permission is received from the Harbour Master. In limiting
the size of vessels for the above harbours this provides mitigation for the safety of navigation,
and no requirement for pilotage. 
11.5 Pilotage Arrangements 
Buckie offers a pilotage service on demand, although it is not compulsory for any class of
vessel.  Commercial vessels unfamiliar with the port are encouraged to take a pilot on arrival
and may request a pilot for sailing.  All pilotage is conducted in accordance with the Buckie Pilot
Boat Coxswain and Pilot Training manual, which is compliant with the National Occupational
Standards and reviewed annually. 
Pilots normally board at least one mile north-north-west of the entrance and always to seaward
of The Mucks.  Pilots land outside the harbour entrance at a point agreed with the master. 
Once onboard the Captain and Pilot will go through the Pilot/Master Interchange card before
continuing entry/exit. 
The harbour authority employs and authorises the pilots and has in place appropriate
qualifications and training requirements (see below).  All hold recognised certification and have
appropriate seagoing experience and local knowledge. 
No pilotage service is offered at the other Moray Council Harbours but the Buckie
harbourmaster can arrange for advice if requested.   
11.2 Training & Qualifications 
Candidates for consideration as Pilot at Buckie should meet the following standards:
• Experience working on commercial vessels, particularly in the bridge
• Be medically fit with good hearing and sight, able to differentiate between colours
(ENG1)
Page 60

Page 61

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 47 OF 75
ISSUE A REV 01.9 MARCH 2026 
• Familiarity with approaches to the harbour, position and nature of the approach lights
and local hazards
• Must be willing to complete the in-house Pilot Training Scheme
• Minimum of six training trips, with an experienced pilot on a representative selection of
vessels of which 
a) 3 trips should be inward
b) 3 trips should be at night 
• Satisfactory examination by the Harbourmaster and/or experienced pilot. 
Any Pilot who has not carried out the duty within the previous 4 months will be given a full brief
by the other Pilot on anything that may be new.  The briefing will revalidate the Pilots authority
to pilot for Buckie Harbour 
Training is in line with the National Occupational Standards (NOS) for Marine Pilotage. As part
of the in-house training a competency assessment has been generated using the key points
from the NOS and can be seen below.  The Pilot Training log allows trainee pilots to log all
lessons learned during their training and therefore ensure that those lessons are passed on to
future pilots. 
A Pilot Continuous Professional Development (PCPD) programme has been set up for pilots. 
The purpose of this is to allow the Buckie Harbour pilots the opportunity to continue developing
their skills gained during the initial training.  It will focus on 3 elements, professional evaluation,
knowledge and skills and emergency response.  If this is not completed over the 3 years from
gaining approval as a pilot then the authority to pilot vessels for Moray Council will be removed. 
Refer to Appendix H – Competency Assessment 
11.3  Competency Assessment 
The Authority may restrict a new pilot to certain vessel dimensions or characteristics for a
probationary period.  The Authority may also restrict pilotage of certain vessels with specialised
or unusual features to certain pilots with appropriate training and experience. 
11.4 Pilotage Exemption Certificates 
As pilotage is not compulsory, there are no provisions for Pilotage Exemption Certificates
(PEC’s). 
11.5 Pilot/Master Interface 
Effective communications between the pilot and the master of the vessel are essential.  Each
must brief the other before the transit commences. 
(i) The Master should provide the Pilot with all relevant information concerning the vessel
and its equipment, relevant to the proposed operation in written or diagrammatic format. 
This should include draft, dimensions, confirmation that all critical equipment is
operational and any limitations or peculiarities of the vessel or its manoeuvring
capability.  This will be noted onto the Pilot Card. 
(ii) The Pilot will advise the Master verbally of all information relevant to the operation
including depths of water, tidal conditions and status of navigation aids.    The master
Page 61

Page 62

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 48 OF 75
ISSUE A REV 01.9 MARCH 2026 
and pilot will agree decision points on the passage, abort plans and necessary
equipment and personnel to be available.  This is on the Passage Plan. 
(iii) The Master will report on any polluting or hazardous materials to the Pilot. 
(iv) The Pilot will report any deficiencies in the performance of the vessel or in the
information exchange to the Harbour Authority.  If performance of the vessel or
personnel is sufficiently downgraded the Pilot shall consider aborting the passage.  The
Pilot and Harbourmaster shall consider whether serious deficiencies require a report to
MCA.  In the first instance Aberdeen Coastguard should be contacted and asked for
advice on the correct person to speak to 
(v) The Pilot will complete a report for any Incident or Near Miss per the Moray Council
format.  The Pilot and Harbourmaster will also consider whether this should be reported
to the MAIB 
11.6 Pilot Boat 
Buckie operates a high speed pilot boat, with good seakeeping characteristics, with which to
board pilots to seaward of The Mucks.  The Boat is crewed by at least two harbour staff in
addition to the pilot.  The harbour office is staffed when the pilot Boat is deployed during office
hours but not out of hours.   
The Boat is equipped with echo sounding and navigation equipment and carries out depth
surveys at Buckie, Burghead and areas of the recreational harbours which do not dry out.  It
should be crewed by at least two staff for survey operations. 
Generally, Pilot Boat operations are carried out in line with the MCA Code of Practice on the
Safety of Small Workboats and Pilot Boats.   The Buckie Boat is surveyed periodically by
approved consultants for the SWB2 Document of Compliance. 
A Tool Box Talk risk assessment will be carried out before each Boat operation to identify the
tasks, the particular hazards involved, each person’s responsibilities, protective equipment to be
used and contingency plans in the event of an incident.   
11.7 Pilotage Operations Procedures 
a) Duty Watchman to check lights and run pilot Boat engine prior to operation.
b) Nominated 2 man crew, Pilot & Duty Harbourmaster muster 20 minutes before estimated
arrival/sailing time.
c) Harbourmaster confirms that sufficient depth of water for the operation, given vessel’s
draft and weather conditions.
d) Harbourmaster liaises with Pilot to ensure weather conditions suitable for the operation
to proceed safely.
e) Aborting the operation whilst in progress is at the discretion of the pilot.
f) Whether to go alongside the vessel is at the discretion of the nominated pilot Boat
coxswain. 
Page 62

Page 63

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 49 OF 75
ISSUE A REV 01.9 MARCH 2026 
Notes: The Boat is operated in compliance with the MCA Small Workboats and Pilot Boats
Code of Practice, under which Buckie Pilot Boat is considered a pilot boat vessel for
operation within 3 miles of a safe haven
Page 63

Page 64

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 50 OF 75
ISSUE A REV 01.9 MARCH 2026 
12 OTHER HARBOUR CRAFT 
Any other small craft used for harbour services should be operated to the same safety
standards as for the harbour launches. 
Any small craft used for harbour and associated works, including pilot boarding/landing and
harbour surveys, whether operated by the harbour personnel or by contractors must: 
▪ Be suitable, and certified where appropriate, for the task, the working area and the
environmental conditions;
▪ Be crewed by at least two competent persons;
▪ Be aware of larger vessel movements which may affect the operation;
▪ Have an alternate means of propulsion to the primary engine;
▪ Maintain watch on VHF and be in constant radio contact with a designated person
onshore;
▪ Carry lifejackets, a torch, flares and other means of attracting attention;
▪ If proceeding out with the enclosed harbour, be fitted with an operating compass. 
The crew must wear life vests and safety lines, properly fastened, when on exterior decks or
when in an open craft.  Single operators must wear a life vest and safety line at all times when
in the craft. 
The crew and their onshore supervisor must carry out a “tool-box talk” before commencing the
operation, at the least this should cover: 
▪ All required tools and equipment for the task available;
▪ Sufficient, competent crew for operation, task requirements understood;
▪ Weather and tidal conditions, present and expected, checked and suitable;
▪ Marine craft safety and communications equipment in place, usage understood by crew;
▪ Communications procedures and methods agreed and understood;
▪ Parameters for aborting the operations agreed;
▪ Contingency/escape plans agreed and understood in the event of problems or incident. 
A full debrief will be held when back in the office looking at what went well and what could be
done better to ensure any lessons learned are fully communicated to the team. 
Page 64

Page 65

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 51 OF 75
ISSUE A REV 01.9 MARCH 2026 
13. INCIDENT & NEAR MISS REPORTING 
Reporting and Follow-up Flowchart
The following flowchart summarises the incident reporting and follow up system.
Page 65

Page 66

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 52 OF 75
ISSUE A REV 01.9 MARCH 2026 
Incident Reporting Procedure Flow Chart  Incident Occurs
Person(s) Present - take appropriate
action, eg, get medical assistance, give
first aid, make area safe, etc.
Notify the Reporting Officer for your
section/team, this will usually be the
Line Manager or Supervisor 
Reporting Officer - is the incident so
serious that others need to be informed
immediately? eg, death, major injury
under RIDDOR (see SMS7.1), injury to
a person not at work, service
threatening event, etc.  Contact H&S
Section if advice is required
Yes 
No
Contact the HSE Incident Contact
Centre by phone (08453009923)
for fatalities or major injuries. 
Fatal incident occurring out of
hours should be reported to the
HSE Duty Officer (01519229235). 
Other RIDDOR reportable injuries
notify the HSE ICC online.  
www.hse.gov.uk/riddor/index.htm 
Inform your Section Head
and the H&S Section
(01343) 563629
Buckie harbour is
operated as a
temporary
storage facility
complying with
the relevant UK
government
requirements.
The port utilises
MCA approved
software to
monitor track and
authorise
movements of
cargo in
compliance with
the UK customs
and Border force
requirements. 
Shipping agents
should liaise with
Harbourmaster to
ensure all
relevant
documentation is
completed prior
to vessels
departing port of
origin before
passage to
Buckie. 
Reporting Officer - implement the rest
of the incident reporting procedure,
contact H&S Section if assistance is
required
Is the incident not immediately notifiable to
the HSE, but still reportable under RIDDOR,
eg, an over 7 day injury?  (See SMS7.1 for
the requirements of RIDDOR)
Yes 
Complete the
Internal Incident
Report form. 
File the Internal Incident Report form
(and any reports sent by the HSE) in the
section/team's Accident File ("Accident
Book")
Send copies to the
Section Head and the
H&S Section within 10
days of the incident.
Carry out an
investigation as
appropriate (see
SMS7.1)
Contact the HSE Incident
Contact Centre within 15
days (or as soon as possible
if an injury takes more than
15 days to confirm). 
www.hse.gov.uk/riddor/index
.htm
With serious incidents
inform:  Commucations
Officer (01343) 563601
Consider Head of Dept;
Chief Exec; Local
Councillors.  
Out of office hours
contact Duty CMT/HoS
via Cameron Park Brae
0345 7565656
Person(s) Present - take appropriate action,
eg, get medical assistance, give first aid,
make area safe, etc.
Notify the Reporting Officer for your
section/team, this will usually be the Line
Manager or Supervisor 
Reporting Officer - is the incident so
serious that others need to be informed
immediately? eg, death, major injury under
RIDDOR (see SMS7.1), injury to a person
not at work, service threatening event, etc. 
Contact H&S Section if advice is required
Yes 
No
Contact the HSE Incident Contact
Centre by phone (08453009923) for
fatalities or major injuries.  Fatal
incident occurring out of hours
should be reported to the HSE Duty
Officer ((03453009923)  Other
RIDDOR reportable injuries notify the
HSE ICC online.  
www.hse.gov.uk/riddor/index.htm 
Reporting Officer - implement the rest of
the incident reporting procedure, contact
H&S Section if assistance is required
Is the incident not immediately notifiable to the
HSE, but still reportable under RIDDOR, eg, an
over 7 day injury?  (See SMS7.1 for the
requirements of RIDDOR)
Yes 
Complete the
Internal Incident
Report form. 
File the Internal Incident Report form (and
any reports sent by the HSE) in the
section/team's Accident File ("Accident
Book")
Send copies to the Section
Head and the H&S Section
within 10 days of the
incident.
Carry out an
investigation as
appropriate (see
SMS7.1)
Contact the HSE Incident
Contact Centre within 15 days
(or as soon as possible if an
injury takes more than 15 days
to confirm). 
www.hse.gov.uk/riddor/index.
htm
Page 66

Page 67

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 53 OF 75
ISSUE A REV 01.9 MARCH 2026 
13.11 INCIDENT & NEAR MISS REPORTING 
1.  INTRODUCTION 
The Moray Council seeks to prevent undesirable incidents from occurring as a result of its
activities and has instituted a pro-active safety management system, directions and
operational procedures to ensure they are avoided where possible.  That said, errors and
mistakes do occur and these can result in harm to people or damage to property and
equipment.  This procedure covers how such incidents should be dealt with so that lessons
are learned and repeat occurrences prevented.   
2.  PURPOSE 
To provide a system for recording, reporting and investigating relevant incidents so that
deficiencies and adverse trends in safety performance can be highlighted and addressed. 
3.  SCOPE 
3.1. This procedure covers the following events should they occur in the course of Council
activities: 
− Injuries to persons
− Occupational illnesses resulting from specific events or activities
− Dangerous occurrences and near misses that could have resulted in harm or
material damage
− An environmental incident 
3.2. It applies to anyone involved in, or affected by, work activities undertaken by the
Council, eg, staff, clients, service users, contractors and members of the public. 
Violent and aggressive incidents, however, are not covered by this procedure. 
3.3. At the all of the harbours there are other marine specific potential hazards to consider
such as: 
▪ Groundings, strandings, founderings
▪ Collision or contact with other vessels or craft, navigation aids, other fixed objects,
significant debris or persons in the water
▪ Hard landings against quays, damage to quays and/or vessels
▪ Injury to personnel, falling into water, drowning, other fatality
▪ Significant equipment or propulsion failure on vessels
▪ Other damage to vessels, or property, including wash damage
▪ Other incidents which may result in loss or litigation.
▪ Close quarters situations with other vessels/craft or persons in the water
▪ Vessel equipment or propulsion failure with the potential to cause an incident
▪ Personnel errors with the potential to cause an incident. 
4.  RESPONSIBILITIES 
Page 67

Page 68

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 54 OF 75
ISSUE A REV 01.9 MARCH 2026 
4.1. Duty Holders - approve procedures; monitor implementation; monitor incident data
and take appropriate action, including enforcement. 
4.2. Section Heads - designate staff with responsibility for reporting and investigating
incidents; ensure designated persons are aware of their responsibilities; monitor
procedure implementation; investigate serious incidents (as necessary); monitor
incident data and take appropriate action. 
4.3. Harbourmaster/Assistant Harbourmaster - inform staff of their responsibilities; report
and record all relevant incidents; investigate incidents (as necessary); monitor
incident data and take appropriate action, including investigation and enforcement. 
4.4. All Harbour Employees/Visitors - report any incident they are involved in or witness to
the Harbourmaster or Assistant Harbourmaster. 
4.5. Senior Health & Safety Adviser - monitor procedure implementation; investigate
serious incidents (as necessary); monitor incident data and take appropriate action. 
In certain circumstances the Marine Accident Investigation Branch (MAIB) or Maritime and
Coastguard Agency (MCA) may become involved in incident investigation.
The police will take primacy in any investigation involving death or crime. When someone
dies in a work-related incident or as a result of a navigational incident, a number of different
organisations will require to work with the police to ensure that the incident is investigated
and that the reasons for the death are understood. Moray Council will work with the police to
support their investigation “where appropriate.” 
5.  PROCEDURE 
Incident Occurs: 
5.1. The first priority is to prevent an incident occurring by issuing a Special Direction or
verbal warning. If an incident has occurred those present should take appropriate
emergency action, eg, administer first aid, get medical assistance, make the area
safe, etc.  The objective should be to ensure that no further harm is incurred. 
5.2. The incident should then be reported to the appropriate line manager so that this
procedure can be activated, unless the line manager is already present and can take
the necessary action.  (See above for a flow chart illustration of the procedure). 
5.3. With incidents occurring to staff outside of normal office hours, each service should
have a contact manager who can deal with any incident reporting, immediate
investigation requirement or other actions that cannot be delayed. 
Immediate Notification of Serious Incidents: 
5.4. The initial response of the reporting officer must be to consider if others need to be
told about it immediately. 
5.5. The Section Head and the Health & Safety Section (01343 563073) must be informed
as soon as possible after a serious incident occurs, ie, a death, serious notifiable
injury or any other incident that could be considered significant to the operation of a
Page 68

Page 69

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 55 OF 75
ISSUE A REV 01.9 MARCH 2026 
service.  In addition, the Head of Service and the Communications Officer (01343
563601) should be contacted.  Depending on the severity and type of incident the
Head of Service should consider notifying the Chief Executive and the Local
Councillors. 
5.6. The HSE will also need to be notified immediately under RIDDOR where a death or
serious notifiable injury occurs.  This must be done as soon as possible after the
incident by phone (0345 300 9923, Monday to Friday 0830-1700). The MAIB should
also be informed for any serious incident involving a vessel or personnel on board a
vessel by calling 023 8023 2527. 
5.7. If an incident occurs outside these hours the HSE Duty Officer should be contact by
phone (0151 922 9235):
• following a work-related death;
• following a serious incident where there have been multiple casualties;
• following an incident which has caused major disruption such as evacuation of
people, closure of roads, large numbers of people going to hospital etc. 
All other out of office hours incidents are to be reported on line 
(www.hse.gov.uk/riddor/index.htm)  (http://www.hse.gov.uk/riddor/report.htm#online) 
5.8 When out of hours incidents detailed in paragraph 5.7 have occurred, it is important
that a member of the Council’s SMT is notified, the duty senior officer can be
contacted via Cameron Park Brae on 01343 556102. 
5.9   The harbourmaster or his assistant who observes or is made aware of any event
involving a discharge or probable discharge of oil, or the presence of oil in the sea
shall without delay report the event or presence of oil to HM Maritime and Coastguard
Agency (MCA). 
5.10 In the first instance contact should be made with the MCA in Aberdeen to inform them
on 01224 597900. 
5.11 Second stage is to complete a Post Incident Report on the MCA form and submit to
the Counter Pollution and Salvaging Officer for Scotland and Northern Ireland.  A
blank Post Incident Report Form is stored electronically in the incident file. 
6. Internal Incident Reporting 
6.1. All incidents that come under the remit of this procedure must be formally reported by
completing an Internal Incident Reporting form. 
6.2       An Internal Incident Report form (SMS8.1) must be completed as soon as possible
after the event so that an accurate account of what happened can be gained.  Copies
should then be sent to the Section Head and the Health & Safety Section within 10
days. 
6.3.       These forms can be found on the Intranet homepage under the Forms link.  Forms
should be completed by the relevant line-manager unless the incident involves a
minor injury or near miss, in which case it may be done by the affected person. 
Page 69

Page 70

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 56 OF 75
ISSUE A REV 01.9 MARCH 2026 
7.      RIDDOR and other agencies 
7.1 Deaths, notifiable serious injuries and injuries involving more than 7 days off work are
reportable under RIDDOR where staff are involved, as are certain injuries to non-
employees, some occupational diseases and particular dangerous occurrences. (See
SMS7.1for guidance) 
7.2 Incidents involving people not at work may also be RIDDOR reportable, if they are (1)
injured as a result of something the Council has or has not done, and (2) needed to
be taken to hospital as a result. (See SMS7.1 for guidance) 
7.3 All non-fatal / major injury RIDDOR reportable incidents must be reported to the
HSE's Incident Contact Centre, on line (www.hse.gov.uk/riddor/index.htm). 
7.4 RIDDOR incidents involving contractors must be reported by their own employer and
not the Moray Council.    Where a self-employed person is working under the control
of the Moray Council, however, that person should be treated in the same manner as
a member of staff for the purposes of this procedure. 
7.5 Accidents, including serious injuries, should be reported to the MAIB by the quickest
means possible. This is so that the MAIB can decide whether to investigate the
accident without delay, and to prevent evidence of all types being lost or decaying. 
MAIB should be called on 023 8023 2527 in the first instance and followed up with the
online Accident Report Form 
(https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/49427
6/AccidentReportForm-ElectronicFormV2.pdf) 
7.6 The MAIB (Marine Accident Investigation Branch) are an independent unit within the
Department for Transport with 4 investigation teams and they investigate marine
accidents involving UK vessels worldwide and all vessels in UK territorial waters. 
They do not apportion blame or liability but look for ways to prevent further avoidable
accidents from occurring. 
7.7 The MAIB should be notified if anyone dies as a result of an accident, suffers an
injury or is lost or falls overboard.  If the incident involves a vessel and causes loss of
life, major injury, material damage, is abandoned, damaged by fire, has a collision, is
disabled, causes serious pollution or is involved in a near miss then it should be
reported.  This list is not exhaustive and if further clarification is required the MAIB
should be contacted. 
8.       Record Keeping 
8.1 Original copies of incident forms must be kept within the office from which they were
sent.  They should be stored within a secure Incident Reporting file, which constitutes
the unit's "Accident Book". 
8.2 The HSE will send reports of incidents that they have been notified about and these
should be appended to the corresponding Internal Incident Report form. 
Page 70

Page 71

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 57 OF 75
ISSUE A REV 01.9 MARCH 2026 
8.3 Original copies of incident reports must be kept on file for at least 3 years.   Note that
incident reports involving children must be kept for at least 3 years after their 18th
birthday. 
8.4 Section Heads need to be able to monitor incident trends and should therefore collate
details of incidents that occur within their area of responsibility.  These details can be
kept electronically rather than in the form of stored paper records. 
9.       Investigation and Enforcement 
9.1. All incidents must be investigated.  The extent of the investigation should be in direct
proportion to the seriousness of the occurrence.  (See SMS13 4.01 for guidance) 
9.2.    The Health & Safety Section can decide to undertake an independent investigation if
they believe the circumstances warrant this, as can the HSE if they receive a
RIDDOR report that gives them particular concern.  Staff affected should provide all
necessary co-operation should this occur. 
9.3 Investigations will be carried out by suitably trained personnel including
area/equipment specialists if required.  The aim of all investigations will be to find the
systems failure that created the situation and to ensure that suitable remedial actions
are taken to ensure that the incident does not happen again. 
9.4 Enforcement action in accordance with the Harbours Enforcement Policy should be
considered following investigation to ensure the incident does not happen again. 
Under the Port & Marine Facilities Safety Code, and relevant legisation, Moray
Council is responsible for the effective enforcement of regulations made and Bye-
Laws given to assist in managing marine operations and ensuring the safety of
navigation within the harbour.   
Enforcement underpins navigational safety by ensuring compliance with legislation,
bye-laws or regulation; it requires effective surveillance, incident investigation, and
leads, where appropriate, to sanctions imposed either by Moray Council or when
necessary, by the Courts. 
Moray Council will ensure that any enforcement action taken is proportional to the
risks posed by the breach of legislation, bye-laws or regulation and the seriousness of
the offence.   
Any decision regarding enforcement action will be impartial and objective, and will not
be influenced by race, gender, politics, sexual orientation, disability or religious beliefs
of any alleged offender, victim or witness; such decisions will not be affected by
improper or undue pressure from any source. 
A consistent approach to enforcement in similar circumstances will be adopted
throughout the harbour network and effective liaison will be maintained with enforcing
authorities. Enforcement will be concentrated on those activities which cause the
greatest threat to public safety, employee safety and pose the greatest threats to the
Page 71

Page 72

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 58 OF 75
ISSUE A REV 01.9 MARCH 2026 
environment or undermine regulatory regimes, which have been created to protect
and improve the environment and safety and prevent harm to human health  
10.         DEFINITIONS 
10.1          INCIDENT:  An unplanned, unpremeditated happening which leads to injury or loss,   
or could  have led to injury or loss.  Examples include: 
▪ Groundings, strandings, founderings
▪ Collision or contact with other vessels or craft, navaids, other fixed objects,
significant debris or persons in the water
▪ Hard landings against quays, damage to quays and/or vessels
▪ Injury to personnel, falling into water, drowning, other fatality
▪ Significant equipment or propulsion failure on vessels
▪ Other damage to vessels, or property, including wash damage
▪ Other incidents which may result in loss or litigation. 
10.2  ACCIDENT:  An incident, which causes injury and/or damage. 
10.3 DANGEROUS OCCURRENCE:  A serious occurrence which does not necessarily  
result in a reportable injury, but which has the potential to do significant harm. 
10.4 NEAR MISS:  An occurrence which does not result in injury or loss, but which has the
potential to do so.
• Close quarters situations with other vessels/craft or persons in the water
• Vessel equipment or propulsion failure with the potential to cause an incident
• Personnel errors with the potential to cause an incident 
10.5 OCCUPATIONAL ILLNESS: Illness or medical condition caused by factors within the
workplace. 
10.6 RIDDOR: Reporting of Injuries, Diseases and Dangerous Occurrences Regulations
1995. 
ACCIDENT BOOK (BI 510): HSE book for recording the details of accidents in the workplace.  It
is not a requirement to use a BI 510 Accident Book to record accidents in the workplace. 
However, if one is not used, the information recorded in it must be recorded in an alternative
manner.  The Moray Council’s Internal Incident Report Form, when completed fully, meets this
requirement and storing it in a secure file constitutes an "accident book" 
11 Incident and Near Miss Summary 
YEAR: HARBOUR:
NO DATE INCIDENT TYPE CAUSE FOLLOW
–UP?
YES/NO
DATE
CLOSED
OUT
NOTES       
Page 72

Page 73

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 59 OF 75
ISSUE A REV 01.9 MARCH 2026 
14 PERMIT TO WORK 
Introduction 
In order for us to create a safe working environment for all our staff and contractors at Buckie
Harbour, a Permit to Work System has been developed to control certain types of hazards and
risks.
The contents and elements of this system reflect the principles and intent as laid out by the
Health and Safety Executive. 
Scope 
This permit to work system is applicable to all works being carried out at any of our harbours
(Burghead, Hopeman, Buckie, Findochty, Portknockie and Cullen) and by all personnel
including Moray Council staff and contractors. 
Responsibilities 
Person in Control of Work – This is the person in charge of the work.  On some occasions the
person in charge will be the task supervisor but other times it will be the project leader.  An
individual who is named in the appropriate section of the
Page 73

Page 74

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 60 OF 75
ISSUE A REV 01.9 MARCH 2026 
permit, and approved by an authorised person is the designated Person in Charge, and is
responsible for ensuring that work is undertaken safely and efficiently within the limits of the
permit, including: 
▪ accurate completion of the permit form
▪ obtaining the appropriate level of authorisation
▪ understanding of the work and associated Company procedures
▪ compliance with all written precautions
▪ adherence to safe working practices at all times
▪ informing all affected persons before the start of the work
▪ ensuring the work area is left in a safe, clean condition at each stop, shift change, or on
completion
▪ clearing all tools and equipment from the work area on completion
▪ properly briefing those who will continue the work at a shift change with regards to the
work, necessary precautions, procedures and requirements of the permit
▪ accurate completion of the form when the work is finished and the return of the permit to
the harbour office. 
Harbourmaster – The Harbourmaster (including the Assistant) is the authorised person who
will give the approval for the work to be carried out.  They will ensure that the PTW is filled in
correctly and that there is a copy of the JSA, Risk Assessment or Method Statement and proof
of Third Party Liability Insurance with the permit.  The Harbourmaster will note down any
potential conflicting operations that will be taking place within the harbour that day.  When
possible the Harbourmaster or his appointee will inspect the
worksite prior to signing off the permit to ensure it has been left in a safe and tidy condition. 
Harbour Assistants – In the absence of the Harbourmaster, the Harbour Assistants
(sometimes referred to as Watchmen) take on the role of authorised person with the same
responsibilities to ensure that there are no conflicting operations and that the PTW and JSA etc.
are in place and correct.  Harbour Assistants can sign off a permit which was signed on by the
Harbourmaster. 
Contractors – All contractors will be vetted by their own company for suitability to carry out the
task safely prior to arrival on site,  including  the appropriate level of training and competence.  It
is the contractor’s responsibility to ensure that they are following their own company’s rules and
those of the harbour.  The person in charge will brief the Harbourmaster on the task and safety
considerations to ensure that all risk has been minimised. 
Harbour Users – All harbour users are subject to this same procedure for safe work.    Where
work is being undertaken on a vessel alongside, it may not be appropriate to issue a PTW. Each
case will be risk assessed individually. 
When a permit is required 
Prior to undertaking any work, personnel must determine if a permit is required.  This is
determined by reference to the section below but may also be required by the Harbourmaster
even if it is not listed. 
Work Which Requires a Permit 
Work requiring a permit falls into two basic categories as defined below:
Page 74

Page 75

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 61 OF 75
ISSUE A REV 01.9 MARCH 2026 
1. HOT WORK: Work involving open flames or other sources of ignition, or which may have a
potential source of ignition. 
2. COLD WORK: Other work listed in this section and work that presents a significant hazard,
but no source of ignition 
Work considered “Hot Work” that requires a permit includes, but is not limited to:
▪ work involving open flame
▪ grinding 
▪ electric arc welding
▪ any work involving explosives
▪ use of powered wire brushes or work that can cause sparks
▪ needle gunning
▪ shot blasting, grit or high pressure water blasting
▪ work involving high voltage electrical equipment
▪ work on “live” electrical equipment including switching, testing, fault finding or other work
exposing personnel to live cables, connections or exposing equipment to a hazardous
atmosphere
▪ work that may cause an unintended or uncontrolled hydrocarbon release, including
disconnection of pipework or equipment that contains  or has contained hydrocarbon,
flammable or hazardous materials 
Work considered “Cold Work” that requires a permit includes, but is not limited to:
▪ handling of any substance that could be hazardous to health, including toxic chemicals,
radioactive sources, asbestos, etc. This would not include normal routine operations
such as painting.  
▪ removals of handrails, where an individual could fall 6 feet or more onto the ground or
into the sea
▪ diving operations
▪ work requiring entry into a confined space, tank or vessel
▪ any work which affects the operation of safety and emergency systems, including work
on detection systems, protection systems
▪ work required above an area where others will continue to work normally
▪ heavy or unusual lifts by  a crane, which are defined as anything over 50% of the total
lifting capacity of the crane or defined as a complicated or complex lift
▪ isolation of energy sources
Work Which Does Not Normally Require a Permit 
It is impracticable and unnecessary to have all work covered by a permit. Therefore, work not
listed above would not normally require a permit unless there is a deviation from the normal
procedures or the harbourmaster requests a permit to assist control of the work. A properly
completed JSA, Tool Box Talk, Risk Assessment or Method Statement should usually reveal the
necessity for a permit. 
Authorisation 
The Harbourmaster (including the Assistant) is the only one who can authorise a permit and
issue a permit number.  
Page 75

Page 76

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 62 OF 75
ISSUE A REV 01.9 MARCH 2026 
However if the Harbourmaster is not on shift at the time then a Harbour Assistant/Watchman
can authorise the permits apart from:
▪ Diving
▪ High Voltage Isolations
▪ Work on life saving equipment
▪ Working in an Asbestos contaminated building
▪ Any task where there is a risk to personnel undertaking the work and others in the
immediate vicinity.
▪ Any task where there are members of the public likely to be affected   
Planning 
This is the most important aspect in ensuring efficient control  of the work and communication
between all personnel involved in the work or affected by the work. Planning and preparation
should be made in advance, meetings held, and all aspects of the work, including policy, safe
working practices, procedures, precautions and methods identified, before a permit is obtained.
Planning and preparation of work requiring a permit must ensure all hazards have been
identified, eliminated or controlled, and risks minimised to as low as reasonably practicable. 
Identification and tracking of forms 
All permits will have a unique identifying number written on to the top left hand corner of the
PTW form.  This unique number will consist of the first 3 letters of the harbour name, the last 2
digits of the year and then a sequential number.  This would mean that the first permit for a task
at Buckie Harbour would be BUC/16/01.  Regardless of the harbour the sequential numbers
continue so the second permit issued for a task at Findochty this time would be FIN/16/02.
Permits for Burghead and Hopeman will be
administered from Burghead and for Buckie, Findochty, Portknockie and Cullen they will be
administered from Buckie.  A permit log of what is happening and where it is taking place will be
maintained from these locations. 
Changes to the permit 
Once a permit has been approved no changes can be made without the authorisation of the
Harbourmaster.  These changes should be discussed with the Harbourmaster prior to being
written onto the form where the Harbourmaster will initial his approval onto the form. 
Validity of the Permit 
Permits are can be validated for a period of no longer than 7 days.  After that time a new permit
will be raised and approved.  If a permit was taken out for a period shorter that 7 days and it
looks like that task will run on, approval can be given to extend the permit but only up to 7 days
from when it was issued. 
Temporary stoppage or suspension of work 
On occasion it is necessary to stop the work being carried out, this may be due to the weather
conditions, waiting for parts or many other reasons.  If the work is stopped for more than an
hour, the Person in Control of the work is responsible for letting the harbour office know of the
suspension of work.  If the suspension is for more than one shift, the permit should be returned
to the harbour office.
Page 76

Page 77

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 63 OF 75
ISSUE A REV 01.9 MARCH 2026 
Lock, Tag and Try 
Electrical Isolations – Electrical isolations can only be carried out by an approved electrical
engineering company.  Moray Council has designated Campbell and McHardy as the company
to deal with electrical engineering issues at the harbours.  Moray Council electrical team deal
with the other electrical items such as street lights and Navigation lights.  They must at all times
follow their company procedures for isolations 
Mechanical Isolations – Mechanical Isolations are not commonly carried out around the
harbour but would include such things as isolating the water supply to a pier.  These can be
carried out by any approved person, approval will be given as part of the PTW process. 
When populating the Lock, Tag and Try part of the permit, write in a clear description of the
piece of equipment that is to be isolated and if possible where the isolation point is.  The
Harbourmaster will then approve the isolation.  The isolation is to be carried out prior to the
permit being authorised fully.
Once the item has been locked out it is important to tag the item so that others can see the
isolation point, the piece of equipment isolated should then be tried to ensure that there is no
residual
power going to it.  Failure to do so could result in any of the following hazards: 
▪ Electrical shock
▪ Chemical exposure
▪ Skin burns
▪ Lacerations or amputations
▪ Fires or explosions
▪ Chemical releases
▪ Eye injury
▪ Environmental Incidents
▪ Death 
Any de-isolation has to go through the same process as the isolation, write down the details on
the permit and get the de-isolation approved prior to de-isolating then closing the permit.  
If it is only a partial de-isolation this must be noted on the PTW and initialled as authorised by
the Harbourmaster. 
Permit Form Completion( 
• The Person in Charge of the Task will note down his/her name and some contact details
as he/she will be the main point of contact.  The project site / location or vessel name is
to be noted down then any of the other contractor supervisors whom may need to be
contacted about the task.  The start and finish times are the validity period so they can
be no more than 7 days apart. 
• Next decide which type of permit you require and tick the appropriate box. 
Page 77

Page 78

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 64 OF 75
ISSUE A REV 01.9 MARCH 2026 
• Under the job description put down as much details as you can regarding the task. 
There will be an associated JSA, Risk Assessment or Method Statement for the job and
as a minimum the headings from each of those should be noted down. 
• Note down all the equipment that will be used throughout the task.  ‘Hand Tools’ is not
an adequate description- please list all the tools required. 
• Conflicting or simultaneous operations will be noted down by the Harbourmaster and
discussed with the person in charge. 
• Ensuring adequate protection for members of the public is one of our main priorities in
any task, therefore it is important that site controls are considered during this process
and will be discussed between the Harbourmaster and Person in Charge. 
• Tick any of the appropriate boxes for safety equipment and PPE section.  Think carefully
about the requirements and ensure that any extra equipment required is noted down. 
• On the right hand side of the form is the authorisation section.  It is important that if the
task is complete, the box is ticked.  The permit is neither authorised nor closed if the
appropriate Harbourmaster signature is not there. 
• When the permit is authorised, a photocopy will be taken and given to the Person in Charge to
be kept at the worksite.  The original will be kept in the Harbour office. 
Page 78

Page 79

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 65 OF 75
ISSUE A REV 01.9 MARCH 2026 
15 RECREATIONAL ACTIVITIES 
All the Moray Harbours are used for recreational boating.  At the four smaller harbours it is the
principal activity.  Buckie being principally commercial is the least active, with only passing
yachts stopping in for 1 or 2 nights at a time.  Burghead was becoming more of a recreational
port dealing with larger yachts and launches but in recent years there has been an increase in
the number of trawlers based at the harbour catching prawn/shellfish.  This has meant that the
number of recreational vessels has been reduced.  At the other four harbours recreational
boating includes use of sailing craft, launches and part time creel boats.  Findochty and
Portknockie have three pontoons each of varying length whereas Cullen has one pontoon and
they are for small craft. There is one long pontoon at Hopeman. All harbours have some pier
side berthing.  Areas of the harbour estate at Burghead, Findochty, Portknockie and Hopeman
are used by private individuals to maintain and repair boats. 
At all the harbours there is traditional, open, public access and a variety of water related
activities take place.  These include line fishing, beach swimming, boating and using the piers
as jumping off points. 
The three easternmost harbours are used by speed boats, jet skis and water skiers.  The
Byelaws place restrictions on such craft and require all users to proceed at such speed as not to
endanger others.  A maximum speed of 3 knots applies within all the harbours. 
The exposed approaches to all the harbours make the possibility of a vessel stranding or
foundering in bad weather, a potential event.  There is no practical means of implementing port
closures for the recreational harbours, as small craft may already be at sea. 
The Byelaws contain adequate powers to control recreational activities although with limited
resources locally, enforcement has to be by good example and promoting a culture of safe,
considerate boating. 
Within the recreational harbours, small craft and swimmers present and may be may be
obscured by the piers.  Hence, harbour staff must encourage caution among boat operators to
avoid collisions or interations. 
Regattas, races and public events involving a number of craft within the harbours require 28
days advance notice and consultation with the Harbourmaster.  In reviewing such proposals the
Harbourmaster will consider:
• Potential interference with other port activities
• Any interaction with anticipated commercial traffic
• Provision of safety equipment and safety boats
• Contingency planning in case of bad weather or an incident
• Competence and safety culture of the organisers.
• Is a suitable and sufficient risk assessment in place
• Is there suitable insurance in place 
Page 79

Page 80

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 66 OF 75
ISSUE A REV 01.9 MARCH 2026 
16 
APPENDIX A. PASSAGE PLANNING 
A passage plan will be produced and presented to the master of a vessel during pilotage tasks. 
Admiralty chart 1462 is for the Harbours on the North and East Coasts of Scotland and covers
Buckie, Burghead and Hopeman. 
Page 80

Page 81

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 67 OF 75
ISSUE A REV 01.9 MARCH 2026 
APPENDIX B. MORAY COUNCIL PROCEDURES 
There are many subjects covered throughout the SMS including the standardised forms to be
used.  All the following topics can be found by looking on Moray Council Intranet site available
on all council owned computers. 
5.1 – Hazardous substance Control
5.2 – Personal Protective Equipment
5.3 – Manual Handling
5.5 – First Aid
5.6 – Driving Safely
5.7 – Lone Working
5.8 – Hand Arm Vibration
5.14 – Working at height
5.15 – Confined Spaces
5.18 – Display Screen Equipment
5.19 – Promotion of Mental Health and Wellbeing (Stress Prevention)
5.20 – Musculoskeletal Disorder Management
5.21 – Asbestos Management
5.22 – Blood Borne Viruses 
7.10 – Ladders and Stepladders
7.15 – Noise
7.16 – Office Safety
7.20 – Dealing with work related violence
7.27 – Toolbox Talks Explained 
This list is in no way exhaustive and all the documents are living documents.  If there is an
improvement that could be made to procedures then contact the Health and Safety department
to discuss. 
Page 81

Page 82

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 68 OF 75
ISSUE A REV 01.9 MARCH 2026 
APPENDIX C. MORAY COUNCIL HEALTH AND SAFETY POLICY
Health and Safety Policy Statement
INTRODUCTION
The Council operates a health & safety management system based on a widely accepted model
for ensuring we achieve the desired outcomes from our operations safely. The main elements of
the system are categorised as PLANNING, DOING, CHECKING and ACTING.  
PLAN
A critical part of the planning process is the Health & Safety Policy Statement which is contained
on the following page. This is what clearly defines the intention of the organisation as regards
keeping staff, sen/ice users contractors and the public healthy and safe.
The other main part of planning is formalising how the policy outcomes will be achieved in
practice. What needs to be done to eliminate or control the risks we face, who will carry out the
required actions, how the system will be resourced, w
hat competencies are required and how the system will be assured as adequate all need to be
set down.  
DO
This is the part of the system that ensures that all risks are being dealt with in a sensible and
proportionate manner. It consists mainly of the risk assessment procedures but also deals with
implementation issues like prioritisation, communication, preventive and protective measures,
procurement of goods and services and maintenance.  
CHECK
This part of the system involves us monitoring the system in different ways to keep a close
watch on indicators which tell us about the efficacy of the risk control efforts. The main
indicators are active ones, such as formal checks that the risk control measures are being
followed and reactive ones such as proper investigation after system failures (ie : accidents) to
gain an understanding of the causes.  
ACT
In all the aforementioned monitoring exercises, learning and system improvement is the
fundamental purpose. A regular review of performance on a broad range of measures is
required. Taking note of what is going on in other organisations is also critical to accelerating
the learning process.
A constant loop through the PLAN, DO, CHECK, ACT cycle ensures that the system remains
effective, and that people feel engaged in system improvement action.  
SAFER TOGETHER: EXPECTATIONS
Page 82

Page 83

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 69 OF 75
ISSUE A REV 01.9 MARCH 2026 
We are a diverse organisation, facing many and varied risks; but we commit to identify them,
assess them and then eliminate or control them so that no one suffers injury, ill health or harm
and losses are minimised.
We will strive to ensure the health and safety of our clients and service users in the delivery of
our services.
We will make sure everyone knows of the part they play in keeping themselves and others safe
and healthy.
We will provide and maintain safe and healthy systems of work, working condit
ions and work equipment.
We will ensure employees receive adequate training to ensure employees are competent to do
their work We will engage and involve employees and their representatives in actions to stop
accidents and prevent any life limiting health effects.  
TO MEET THESE EXPECTATIONS
• A good quality risk assessment will be available for all jobs, activities, projects & plans.
• Everyone will be clear of the part they play in controlling risks
• Ways to eliminate or control the risks will be clearly defined.
• A sensible and proportionate approach will be taken to the management of risk.
• Everyone will have opportunities to enable their active participation in the health & safety
systems in operation
• Quick means of communicating problems or concerns will be available  
TO MAKE SURE THE CONTROL OF RISK IS SUSTAINED
• Safety check systems will be provided for workforce & managers to use.
• Any deviations from the desired safe state will be analysed and corrections made.
• Higher risk activities will be subject to regular audit and inspection.
• Information on monitoring results and improvement actions will be provided through
appropriate forums.
• Systems will be in place to ensure that action is taken promptly to address any defects
found 
Page 83

Page 84

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 70 OF 75
ISSUE A REV 01.9 MARCH 2026 
APPENDIX D.  HARBOURS ENVIRONMENTAL POLICY 
GENERAL POLICY 
Moray Council harbours team are committed to protecting the environment and will conduct all
operations in a responsible manner in compliance with the applicable environmental laws and
regulations.   Moray Council Harbours recognise their environmental responsibility and will work
proactively at all times to minimise environmental impact and prevent pollution and the effects
that its activities can have on the environment.  Scottish National Heritage has designated areas
of the Moray Firth as a Special Area
of Conservation (SAC) due to the population of dolphins and porpoises within and some other
areas are classed as a Special Protection Area (SPA) due to the number of birds with European
importance.   
OBJECTIVES 
▪ Continual improvements of our environmental habitat
▪ Foster environmental awareness and responsibility in employees, contractors, suppliers
and other harbour users.
▪ Train employees appropriately to raise awareness of environmental issues and utilise
their support in improving the performance of the team.
▪ Manage waste to minimise the impact on landfill sites and encourage all vessels to do
the same
▪ Consult with the local community and community groups and organisations on their
programmes to ensure environmental considerations are in place
▪ Audit and monitor the management of environmental issues to identify opportunities for
improvement
▪ Maintain procedures and methods which aim to reduce the risk of accidental spills,
emissions and discharges
▪ Maintain emergency response procedures and methods for environmental protection 
Moray Council Harbours team recognise that to achieve the goal of operating environmentally
sound involves all employees and harbour users working together.  We all have the
responsibility both morally and legally to conduct activities with the protection of the environment
as a priority.  
Page 84

Page 85

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 71 OF 75
ISSUE A REV 01.9 MARCH 2026 
APPENDIX E.  DRONE POLICY 
The operation of flying drones at the port of Buckie must only be done in compliance with the
Civil Aviation Authority (CAA website ) requirements and the Dronecode which sets out the
regulations in brief. This code confirms that drones with cameras must not be flown within a
specified distance of people, vessels or structures and cannot be flown over congested areas. 
In addition, Buckie Harbour must also be contacted and informed in advance of any activity
involving drone flying. 
Drone activity on a commercial basis requires the operator to be licensed by the CAA, Buckie
Harbour must be provided with prior confirmation and evidence that a licence is held, liability
insurance is in place and a risk assessment has been carried out. 
Page 85

Page 86

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 72 OF 75
ISSUE A REV 01.9 MARCH 2026 
APPENDIX F.  EMERGENCY PHONE NUMBERS 
Emergency Contact Details
Doctors Surgery (Ardach Health Centre) 0345 099 7200
Seafield Hospital 01542 832081
Dentist (8 to 8) 01542 833087
Dentist Emergency 0845 4565990
Police Scotland Emergency – 999 Non-Emergency - 101
Any Emergency 999
Coastguard (Aberdeen) 01224 592334 
Page 86

Page 87

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 73 OF 75
ISSUE A REV 01.9 MARCH 2026 
APPENDIX G.  HANDLING OF DANGEROUS GOODS 
Page 87

Page 88

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 74 OF 75
ISSUE A REV 01.9 MARCH 2026 
Appendix H  Competency Assessment 
Competency Standard  Complete
d (date)
Assessor Signature
Acquire the relevant factual information
regarding the vessel, including defects
and if the vessel has been to Buckie
before.   
Consult charts, tidal and hydrographic
information and weather forecasts. Know
how these will affect your duties   
Clarify any other factors which may
affect the passage or berthing such as
other vessel movements within the
harbour.   
Prepare the Port Passage Plan using the
pre-arrival documentation and anything
else it is felt should be obtained   
Monitor the data that helped form the
plan and amend as required   
Recognise and act upon changed
circumstances (i.e. weather or
emergencies)   
Provide satisfactory
descriptions/definitions for numerous
nautical terms related to pilotage duties
(i.e. Hydrodynamics) and Harbour
specific terms (i.e. coastal topographical
features)   
How to assess the levels of stress and
fatigue and the potential impact of stress
and fatigue on individual capability   
Safely embark and disembark the vessel 
Assess the standards on the vessel 
Work and communicate effectively with
the bridge team   
Maintain effective communication with
the port   
Ensure safe movement in harbour and
approaches   
Respond to problems and emergency
situations   
Page 88

Page 89

MORAY HARBOURS SAFETY MANAGEMENT SYSTEM PAGE 75 OF 75
ISSUE A REV 01.9 MARCH 2026 
Page 89

Page 90

No embedded text on this page.

Page 91

Appendix 2 
Moray Council Harbours Enforcement Policy 
Moray Harbours are operated in compliance with the Port Marine Safety Code
(section 6.25) and harbour legislation. 
Byelaws and directions have been adopted to manage the identified marine safety
and conservancy risks. These are backed by an appropriate policy on enforcement
and a clear policy on prosecution. Any enforcement action taken should be
proportionate to the risks posed by the breach of legislation, byelaws or regulation
and the seriousness of the offence.
This document sets out the Moray Council harbours policy with regard to
enforcement and prosecution. This policy is approved by the Duty Holder.
The Harbour Master is appointed to manage and enforce the marine safety risk and
conservancy of the harbours. Risk assessments and operational procedures have
been developed to ensure a safe methodology all vessels and masters must follow
when operating within harbour limits or their approaches.
If a vessel or master does not comply with a direction or regulation of the harbour,
they may be subject to prosecution and enforcement action to the limits defined by
the harbour regulations. 
Non-compliance with a Special Direction will immediately proceed to enforcement
action following investigation by the Harbour Master and approval of the Duty Holder.
Non-conformity with directions, regulations and conservancy matters following an
investigation by the Harbour Master, will normally be enforced by a verbal warning
and then a written warning, prior to initiating formal enforcement action following
approval of the Duty Holder. These consecutive steps need not be followed if it is
deemed appropriate. The Duty Holder must be kept informed of the issuing of verbal
and written warnings. Verbal warnings and Special Directions issued verbally must
be logged in the Harbour log.
Enforcement action will be approved by the Duty Holder following a review of the
investigation. Both the investigation and the review will be confidential to the Harbour
and not subject to public scrutiny.
Offences could include, but are not restricted to:
• Navigating in an unsafe manner
• Operating under the influence of drink or drugs
• Causing pollution
• Berthing or storing vehicles, equipment, goods, or trailers on the quayside
without permission
• Inadequate mooring arrangements 
Page 91

Page 92

Sanctions available include prosecution and fines, the recovery of costs, the
withdrawal of harbour services, the restriction of access to vessels, or individuals, to
harbours and the removal of vessels, vehicles, equipment, goods and trailers from
harbours.
Enforcement action up to and including recovery of costs and the withdrawal of
harbour services is carried out within existing delegated powers under the
management arrangements agree by the Head of Operations & Environment with
the Service Manager – Harbours. Enforcement action which could lead to
prosecution and fines will be instigated following approval of the Duty Holder in
conjunction with the Legal Services team by reporting the offence to the Police,
MCA, MAIB or HSE (as appropriate) to enable preparation of cases to the Procurator
Fiscal. 
Page 92

Page 93

Moray Council Harbours
Formal Safety Assessment to Establish the Requirement for
Vessel Traffic Services for Moray Council Harbours 
Version 1.0
Date: March 2026
Appendix 3
Page 93

Page 94

Formal Safety Assessment to Establish the Requirement for Vessel Traffic Services
Moray Council Harbours   
Moray Council Harbours – Formal Safety Assessment    Page 2 
Executive Summary
Following the issue of the 2025 Port & Marine Facilities Safety Code (PMSC) the Moray Council
Harbours Managers conducted a Formal Safety Assessment (FSA), in conjunction with the Harbour
Master, to determine whether Vessel Traffic Services (VTS) was a requirement for Moray Council
Harbours. The assessment was completed with reference to and in compliance with all relevant
statutory requirements and industry guidance, including the latest Marine Guidance Note (MGN) 401
and the Port & Marine Facilities Safety Code (PMSC), which mandates that Statutory Harbour
Authorities (SHAs) assess the need for VTS or the appropriate level of Local Port Service (LPS).
Moray Council Harbours jurisdiction covers six harbours; Burghead, Buckie, Cullen, Hopeman,
Findochty, and Portknockie. 
Buckie is the main commercial harbour supporting various marine activities including short sea tramp
trade handling small coasters up to 90m in length (handling dry bulk cargos), the CTV Offshore Wind
base for Ocean Winds, a small fishing fleet, marine boatyard (MacDuff) and the Buckie RNLI lifeboat.
The remaining harbours are small ex fishing ports that support recreational activities, with the
exception of Burghead that supports a number of local fishing vessels up to 10m in length. 
Engagement was sought with a wide range of key stakeholders and feedback, through user group
meetings, and did not identify any critical issues or concerns regarding Moray Councils Harbours
operation of its LPS or its management of navigational safety. Mariners generally view the harbour
navigation as a ‘safe area’.
Traffic data was collected for the period January 2023 to January 2026 and vessel density analysis
confirmed that leisure traffic significantly outweighed all other vessel categories within the Statutory
Harbour Area (SHA) and its approaches. The traffic analysis also showed a decline in commercial
shipping movements from on average 52 ships per annum dropping to as little as 12 on current
shipping pattern. 
Incident analysis covering the period January 2023 to January 2026 identified a low level of
navigational safety incidents relative to the volume and frequency of operations, with key incident
causes being human error and adverse weather.
The FSA assessed undesirable navigational scenarios using defined likelihood and impact categories.
Based on the assumption of a working LPS, the assessment found that the general risk profile for the
safety of navigation at Moray Council Harbour to be low.
The FSA finds that there is no requirement for a VTS at Moray Council Harbour. The LPS facilities and
procedures which exist are considered to be appropriate and fit for purpose, with some minor
improvements across the smaller recreational harbours, in order to ensure the safe and efficient
management of navigation within the harbour limits and its approaches. 
Page 94

Page 95

Formal Safety Assessment to Establish the Requirement for Vessel Traffic Services
Moray Council Harbours   
Moray Council Harbours – Formal Safety Assessment    Page 3 
1. Acronyms & Definitions
Acronym or Term Definition or Description
ACoP Approved Code of Practice
AIS Automatic Identification System 
AtoN Aid to Navigation
CCTV Closed Circuit Television
CERS3 Consolidated European Reporting System, Version 3
DfT Department for Transport
DH Duty Holder
DP Designated Person
EIA Environmental Impact Assessment
EMODnet European Marine Observation and Data Network
FSA Formal Safety Assessment
GLA General Lighthouse Authority
GT Gross Tonnes
GTGP A Guide to Good Practice on Port & Marine Facilities (April 2025)
HEO Harbour Empowerment Order 
HGV Heavy Goods Vehicle
HRO Harbour Revision Order 
HSQE Health, Safety, Quality & Environment
IALA International Association of Marine Aids to Navigation and Lighthouse
Authorities
IMDG Code International Maritime Dangerous Goods Code
IMO International Maritime Organisation 
ISPS Code International Ship & Port Facility Security Code
LGV Light Goods Vehicle
LLA Local Lighthouse Authority
LPS Local Port Service
MAIB Marine Accident Investigation Branch 
MCA Maritime & Coastguard Agency
MC Moray Council
MGN Marine Guidance Note
MOU Memorandum of Understanding 
MSMS Marine Safety Management System
MV Motor Vessel
NOC National Oceanography Centre 
NRA Navigational Risk Assessment
NtM Notice to Mariners 
NTSLF National Tidal and Sea Level Facility
OPRC International Convention on Oil Pollution Preparedness, Response and Co-
operation
OSCP Oil Spill Contingency Plan
PEC Pilotage Exemption Certificates
PEP / ERP Port Emergency Plan / Emergency Response Plan
PFSP Port Facility Security Plan
Page 95

Page 96

Formal Safety Assessment to Establish the Requirement for Vessel Traffic Services
Moray Council Harbours   
Moray Council Harbours – Formal Safety Assessment    Page 4 
Acronym or Term Definition or Description
PMSC / The Code Port & Marine Facilities Safety Code (April 2025)
PWMP Port Waste Management Plan
RA Risk Assessment
RNLI Royal National Lifeboat Institution
SEPA Scottish Environment Protection Agency
SHA Statutory Harbour Authority or Statutory Harbour Area
SIRA Simplified IALA Risk Assessment Method 
SMS Safety Management System
SOLAS The International Convention for the Safety of Life at Sea 
UHF Ultra High Frequency (Radio)
UKHO UK Hydrographic Office
VHF Very High Frequency (Radio)
VTMS Vessel Traffic Management System
VTS Vessel Traffic Service 
Page 96

Page 97

Formal Safety Assessment to Establish the Requirement for Vessel Traffic Services
Moray Council Harbours   
Moray Council Harbours – Formal Safety Assessment    Page 5 
2. Introduction to Formal Safety Assessment (FSA)
2.1 Legislative and Regulatory Background
Section 52 of the Harbours, Docks and Piers Clauses Act 18471 provides for the Powers of harbour,
dock, or pier master and states that the harbour master may give directions relating to vessel traffic
management within the prescribed limits of the harbour.
Section 40A of the Harbours Act 19642 provides that a Statutory Harbour Authority (SHA) has powers
and duties within its port limits and may give directions in respect of the movement, mooring and
unmooring of ships within the harbour limits or entering or leaving the harbour, this being subject to
any direction under section 52 of the Harbours, Docks and Piers Clauses Act 1847.
The International Convention for the Safety of Life at Sea (SOLAS) Chapter V Regulation 12 (Vessel
Traffic Services) requires Contracting Governments to arrange for the establishment of Vessel Traffic
Services (VTS) where, in their opinion, the volume of traffic or the degree of risk justifies such service.
It further requires that Contracting Governments planning and implementing VTS shall, wherever
possible, follow the guidelines developed by the International Maritime Organisation (IMO).
Adopted in 2021, one of the general principles of the IMO Resolution A.1158(32)3 relating to
Guidelines for Vessel Traffic Services is that the need for VTS should be assessed and reviewed through
risk assessment. These guidelines also highlight that International Association of Marine Aids to
Navigation and Lighthouse Authorities (IALA) publishes standards and associated recommendations,
guidelines and model courses specifically related to the establishment and operation of VTS to
contribute to achieving worldwide harmonization of VTS and advise that Contracting Governments are
encouraged to take into account IALA standards and associated recommendations, guidelines and
model courses.
The latest revision of the IMO ‘Revised Guidelines for Formal Safety Assessment (FSA) for Use in The
IMO Rule-Making Process’4 (IMO FSA Guidelines) states that FSA is a structured and systematic
methodology, aimed at enhancing maritime safety, including protection of life, health, the marine
environment and property, by using risk analysis and cost-benefit assessment. The guidelines further
advise that FSA can be used as a tool to help in the evaluation of new regulations for maritime safety
and protection of the marine environment or in making a comparison between existing and possibly
improved regulations, with a view to achieving a balance between the various technical and
operational issues, including the human element, and between maritime safety or protection of the
marine environment and costs.
The Ports & Marine Facilities Safety Code5 (PMSC), April 2025, sets out a national standard for every
aspect of port and marine facility safety. Its aim is to enhance safety for everyone who works in, or
uses, ports, harbours, marinas and other marine facilities. The PMSC includes references to the
statutory responsibilities some organisations have for marine safety. In terms of safe and efficient
marine operations the PMSC requires that, under local and national legislation, an SHA has powers
and duties to manage vessel traffic within their limits. In the context of vessel traffic management 
1 Harbours, Docks and Piers Clauses Act 1847
2 Harbours Act 1964
3 Resolution A.1158(32) Adopted on 15 December 2021 (Agenda item 12) Guidelines for Vessel Traffic Services
4 Revised Guidelines for Formal Safety Assessment (FSA) for Use in The IMO Rule-Making Process
5 Ports & Marine Facilities Safety Code
Page 97

Page 98

Formal Safety Assessment to Establish the Requirement for Vessel Traffic Services
Moray Council Harbours   
Moray Council Harbours – Formal Safety Assessment    Page 6 
there is a requirement to assess if VTS should be established in the interests of marine safety, and if
not, what level of Local Port Service (LPS) is required. This must be completed with reference to MGN
401 and the PMSC further states that the assessment of vessel traffic management is determined by
means of a formal risk assessment into the safety of navigation.
Marine Guidance Note (MGN) 401 (M+F) Amendment 36 ‘Navigation: Vessel Traffic Services (VTS) and
Local Port Services (LPS) in the UK’ provides the relevant guidance to assist SHAs in considering the
implementation of a VTS or LPS in the UK. The MGN encourages Contracting Governments to take into
account IALA standards and associated recommendations, guidelines and model courses. The MGN
also includes the following key points:
• It defines the UK’s interpretation of VTS;
• Provides guidance for determining the need to establish a VTS;
• Defines the responsibilities of those authorities concerned with providing VTS and LPS in the
UK; and
• It complements the PMSC and the Guide to Good Practice (GTGP) on the management of
safety in ports.
The MGN further states that a SHA is responsible for assessing the need for VTS or the need for LPS,
within its own port limits in accordance with the Port Marine Safety Code (PMSC) following the advice
provided in this guidance and also in IALA Guidelines and Recommendations. The SHA should establish
the need for a VTS or provision of a LPS by means of a formal risk assessment into the safety of
navigation, as required by the PMSC and taking into account the standards established by the
Competent Authority for VTS.
IALA has developed an international document structure consisting of standards, recommendations,
guidelines and model courses. Its VTS Manual7 is intended to provide guidance on and complement all
IALA documentation relating to VTS.
IALA Guideline G1150 Establishing, Planning and Implementing a VTS8 sets out the five project
management phases and the key areas for consideration as they relate to VTS and provides guidance
on the processes for establishing the need for a VTS with particular reference to formal risk assessment
processes. The goal of the first phase, ‘Initiating’, is to determine the need for a VTS at a broad level,
including use of the process of formal risk assessment for which IALA offers risk assessment tools. This
approach is aimed at determining whether a VTS is an appropriate risk control option to enhance the
safety of shipping, maritime users, members of the public and the protection of the marine
environment. Demonstration of compliance with IALA and national guidance should reduce a port’s
exposure and liability to claims in the event of an incident.
IALA Guidance G1142 Provision of a Local Port Service other than a VTS9 provides guidance to assist
entities operating a LPS to enhance efficiency and safety in a globally harmonized manner. 
6 Marine Guidance Note (MGN) 401 (M+F) Amendment 3 ‘Navigation: Vessel Traffic Services (VTS) and Local Port
Services (LPS) in the UK
7 VTS Manual, Edition 8.5, June 2025
8 G1150 Establishing, Planning and Implementing a VTS
9 G1142 Provision of a Local Port Service other than a VTS
Page 98

Page 99

Formal Safety Assessment to Establish the Requirement for Vessel Traffic Services
Moray Council Harbours   
Moray Council Harbours – Formal Safety Assessment    Page 7 
IALA Guideline G1018 Risk Management10 provides guidance to Local Lighthouse Authorities (LLA) in
applying risk management to their activities. It makes reference to the use of FSA as recommended by
the IMO for use by maritime authorities and links FSA to relevant IALA guidelines. 
IALA Guideline G1138 The Use of the Simplified IALA Risk Assessment Method (SIRA)11 provides
guidance on this structured process which identifies navigational hazards, and undesirable scenarios
in an area of interest. The SIRA tool follows the IMO FSA methodology and it is intended that a SIRA
assessment is based on available data and information, together with expert opinion elicited from
maritime stakeholders.
2.2 Scope of Work
Moray Council has undertaken a Formal Safety Assessment (FSA) to establish whether or not there is
a requirement for Vessel Traffic Services (VTS) at the following harbours; Buckie, Cullen, Findochtry,
Burghead, Portknockie, Hopeman.
The FSA will, as appropriate, provide any additional commentary as regards the content of a VTS or an
LPS, but as an informational approach to allow Moray Council to make informed decisions about the
future management of navigation at Moray Council harbours.
2.3 Methodology
In consideration of all of the relevant legislative, regulatory and industry requirements and guidelines,
a methodology based on the principles of the SIRA model has been adopted as the basis for conducting
this FSA. 
The SIRA model allows the assessment of maritime and navigation risk such that Moray Council can
meet their obligations for the safe management of navigation. SIRA provides a means of conducting
an assessment of risk and ensuring the results are appropriately considered and recorded for future
reference. It is intended that a SIRA assessment is based on available data and information, together
with expert opinion elicited from maritime stakeholders. The SIRA process does not include cost
benefit appraisal of the identified risk control options. However, if VTS is identified as a requirement,
an assessment of costs will be conducted and discussed.
The SIRA model follows the IMO FSA process as shown in Figure 1. 
10 G1018 Risk Management
11 G1138 The Use of the Simplified IALA Risk Assessment Method (SIRA)
Page 99

Page 100

Formal Safety Assessment to Establish the Requirement for Vessel Traffic Services
Moray Council Harbours   
Moray Council Harbours – Formal Safety Assessment    Page 8 
Figure 1. IMO FSA process.
The methodology used for this assessment, adapted from the FSA process and based on the principles
of SIRA, will involve the key stages as described in Figure 2. 
Figure 2. Moray Harbours Port FSA Key Stages.  
Define and describe the assessment area(s)
Establish the port baseline condition
Consult with relevant stakeholders
Collect relevant data
Identify undesirable scenarios
Assess the likelihood and impact of undesirable scenarios
Considering the requirement for a VTS or LPS
Produce a comprehensive report
Communicate conclusions and recommendations as appropriate
Page 100

Page 101

Formal Safety Assessment to Establish the Requirement for Vessel Traffic Services
Moray Council Harbours   
Moray Council Harbours – Formal Safety Assessment    Page 9 
3. Harbour Port Baseline Condition
3.1 Harbour Limits & Approaches
The limits of the port within which Moray Council shall exercise jurisdiction as the harbour authority
and within which the powers of the harbour master shall be exercisable are defined in The Grampian
Harbour Confirmation Order 1987. The limits can be visually represented as shown in Figure 3 and this
indicates the positions of local geographical points and the proximity of adjacent statutory harbour
area to the east, located at:
Buckie Harbour 
Burghead Harbour 
Page 101

Page 102

Formal Safety Assessment to Establish the Requirement for Vessel Traffic Services
Moray Council Harbours   
Moray Council Harbours – Formal Safety Assessment    Page 10 
Cullen Harbour 
Findochty Harbour 
Page 102

Page 103

Formal Safety Assessment to Establish the Requirement for Vessel Traffic Services
Moray Council Harbours   
Moray Council Harbours – Formal Safety Assessment    Page 11 
Hopeman Harbour 
Portknockie Harbour 
Figure 3-8. Moray Council Harbours  Statutory Harbour Area in relation to the surrounding area 
This FSA will be based upon an assessment of vessel traffic and activity operating within the Moray
Council harbour limits and its approaches.
Page 103

Page 104

Formal Safety Assessment to Establish the Requirement for Vessel Traffic Services
Moray Council Harbours   
Moray Council Harbours – Formal Safety Assessment    Page 12 
The Confirmation Orders, dated 1987, allows Moray Council Harbour to undertake the following
activities;
• Local Notices to Mariners (NtM);
• Navigation Aids (AtoN);
• Allocate harbour Berths;
• Pilotage Within Port Limits and Approach Channel;
• Navigation Restrictions in Approach Channel;
• Vessels Carrying (IMDG) Dangerous Goods;
• Recreational and Fishing Vessels within Port Limits and Approach Channel;
• Vessel Defect Reporting;
• Operation of Bow Thrusters and Propellors;
• Bunkering Protocol;
• Accident /Incident Reporting;
• Commercial Diving Operations;
• Powers to Board a Vessel;
• Towage Operations;
• Dredging Guidance;
• Hydrographic Guidance;
• Arrival Reporting – CERS3 Requirements; and
• Appendices including:
o Navigation Aids within harbour Limits;
o Summary of Agreements;
o Bunkering Checklists;
o Marine Incident Report Form; and
o Towage Checklist.
The Harbour Master has powers to issue special directions which may be issued by the harbour master. 
3.2 Facilities & Services
The facilities with the jurisdiction of Moray Council Harbours include:
Buckie Harbour 
Buckie harbour has four basins. Basin one handles small coasters up to 90m in length overall and
supports berthing for larger drafted fishing vessels. Basin two supports the Offshore CTV operation for
OceanWind. Basin three provides berthing for small fishing/workboat vessels and also berthing for the
Buckie RNLI vessel and the MacDuff Shipyard slipway. The access channel to Buckie is maintained at a
contracted depth of -3.0m CD for Ocean Winds. 
Burghead Harbour 
Burghead harbour occupies a sheltered position and consists of a single basin. The harbour has
become the operational base for a growing number of inshore vessels engaged mainly in the shellfish
and squid industry. A quay wall of 196 metres is allocated to pleasure craft, with the remaining 216
metres for commercial vessels.
Page 104

Page 105

Formal Safety Assessment to Establish the Requirement for Vessel Traffic Services
Moray Council Harbours   
Moray Council Harbours – Formal Safety Assessment    Page 13 
Cullen Harbour 
Cullen harbour features two basins, with only the larger inner basin used for mooring. Approximately
25 pleasure and part-time fishing boats are moored here. Fresh water supplies are available, and those
wanting to visit should contact the Harbour Master in advance as the harbour dries out completely at
low tide.
Findochty Harbour 
Findochty harbour has two basins. Over 100 pontoon berths are available to accommodate the
demand from a wide range of pleasure and fishing boats which mainly consist of creel boards and long-
liners catching mackerel.
Hopeman Harbour 
Hopeman harbour was originally built for the export of sandstone quarried nearby, but as that declined
the local fishing industry used the harbour. It consists of two basins but only the inner basin is used for
mooring. There are 51 berths on the pontoons, for 6 and 8 metre boats, which are predominantly
leisure craft. A quay wall of 288 metres is allocated for pleasure boats.
Portknockie Harbour
Portknockie manages a number of crab and lobster fishing boats, although it is mainly used by leisure
craft. Currently two pontoons in the inner basin provide berthing for up to 50 boats. Visiting craft are
welcome and the harbour is accessible to small boats at all states of tide. There is also still an open-air
swimming pool located at the south west corner of the harbour. 
Moray Council currently operates a full time LPS for Buckie Harbour, as the main commercial harbour,
and provide remote support to the five other locations via personnel based at Buckie Harbour. The LPS
duty watchman provides information to mariners and the general public on harbour safety issues
within the harbour limits and its approaches. 
Moray Council provides non-compulsory pilotage are under the Pilotage Act 1987 (CHA), as defined in
the 1987 Act. Pilotage is only offered at Buckie due to the layout and constraints of the other harbours,
The Navigational Risk Assessments and Harbour Safety Management System outlines no pilotage is
offered at Burghead, Cullen, Findochty, Hopeman and Portknockie, but users can seek advice from the
Harbour Master. Vessels are limited at these ports to 15m length overall without express permission
from the Harbour Master. 
Pilotage is managed by the harbours team. The Buckie pilots are self employed (contracted by Moray
Council) to deliver pilotage on behalf of the CHA. 
Page 105

Page 106

Formal Safety Assessment to Establish the Requirement for Vessel Traffic Services
Moray Council Harbours   
Moray Council Harbours – Formal Safety Assessment    Page 14 
3.3 Conservancy
At Moray Council Harbours there are a number of Aids to Navigations. These are shown in Error!
Reference source not found. and can be described as:
(i) Buckie 
• Qk Fl R 5 sec, 5m 7M  Marking West Muck rocks  
• Iso WG 2 sec 20 m 16/12M White light, in line with the North Pier light provides clearing
line 125º/305º, west of The Mucks; 
• Green sector marks the rocks to the west of the Entrance; 
▪ Occ R 10s 15m 15M  North Pier 
(ii) Burghead 
• Occ 8 sec 7m 5M - South-western corner of the North Pier
• Qk Fl R 3m 5M - Extremity of the North Pier and channel
• Qk Fl G 3m 5M - Extremity of South Pier and channel  
• Fl G 5 sec 2m 1M - Southern extremity of groyne, east side of the channel 
(iii) Hopeman 
• Occ G 4s 8m 4M - North-west corner of the West Pier
• FR 3 & 4m - Leading lights marking the entrance channel  081º. 
(iv) Findochty 
• Unlit beacon on the north-west corner of the West Pier.  
• Fixed red leading lights marking the approach channel.  
(v) Portknockie 
• Flashing green leading lights marking the approach channel. 
(vi) Cullen 
• Unlit beacon on the south-west corner of the North Pier.  
• Flashing green light marking the entrance channel. 
These lights are inspected on a monthly basis by the Buckie Harbours team and there is a system in
place to monitor and report and defects and AtoN performance.
Moray Council undertakes bathymetric surveys on a periodic basis, and interim lead line surveys
utilising the Buckie Pilot vessel. As necessary, for example as a result of identifying a reduction in
navigable depths or other differences between current charts and the latest survey, local notices to
mariners will be raised until such time as maintenance dredging can be undertaken to maintain the
area. Bathymetric survey data is also passed to the UK Hydrographic Office (UKHO) to maintain charts
up to date.
Page 106

Page 107

Formal Safety Assessment to Establish the Requirement for Vessel Traffic Services
Moray Council Harbours   
Moray Council Harbours – Formal Safety Assessment    Page 15 
3.4 Environmental Conditions and Hazards
Mory Council Harbours provides a natural shelter from the prevailing conditions in the North Sea and
Moray Firth  Figure 4 shows the wind conditions at the entrance to the harbours indicating general
wind direction to range between south, south west through to west and South, South East. Conditions
within the harbours are relatively sheltered from south westerly winds. 
Buckie Harbour          Burghead Harbour             Cullen Harbour
It was noted over the past 12months more significant east winds have been prominent and cause
concern to shift sand banks close the harbours. 
Figure 4. Wind Rose data across Moray Council Harbours.(Data Explorer. 2018. ABPmer. 25 November 2025,
www.seatates.net) 
Figure 5 shows the significant wave height and direction at the entrance across the Moray Firth to be
predominantly from the North East. The approaches to all Moray Council Harbours are exposed in
significant periods of wave formation from the north or east. The predominance of north easterly wave
direction and height is due to the lack of natural shelter from this direction and conditions within the
channel are exacerbated due to shallowing water and funnelling effect of the local geography. 
Buckie Harbour                          Burghead Harbour                            Cullen Harbour
Figure 5. Wave Rose at the Moray Firth. (Data Explorer. 2018. ABPmer. 25 November 2025, www.seatates.net) 
Page 107

Page 108

Formal Safety Assessment to Establish the Requirement for Vessel Traffic Services
Moray Council Harbours   
Moray Council Harbours – Formal Safety Assessment    Page 16 
Buckie Harbour provides a local tide prediction modelling link via internal tidal data available to the
duty watchman. This information can be promulgated to users on request. 
In addition, the Scottish Environment Protection Agency (SEPA) maintain a tide gauge at Buckie and
Cullen harbour. Error! Reference source not found. shows a standard harmonic wave demonstrating
the tidal curve at Buckie. The nominal tidal range, extracted from the SEPA tidal data, for Buckie is -
2.072m to 2.73m 
Buckie Harbour provide live environmental data at the harbour office, with information collected via
the sensors located in the harbour. The live information includes:
• Average wind speed;
• Wind direction;
• Max wind gust;
• Tide height;
There is no environmental data available for Burghead, Cullen, Hopeman, Findochty and Portknockie. 
Page 108

Page 109

Formal Safety Assessment to Establish the Requirement for Vessel Traffic Services
Moray Council Harbours   
Moray Council Harbours – Formal Safety Assessment    Page 17 
3.5 Harbour Management & Equipment
At present, Buckie Harbour operates a Local Port Service (LPS) which provides information to Mariners
and the general public on harbour safety issues within the harbour limits and its approaches, including:
• Navigational and safety guidelines;
• Local notice to mariners (NtM);
• Local environmental and climate conditions;
• Vessel movements;
• Initiation of any port emergency protocols;
• Transit of dangerous goods;
• Aids to navigation; and
• Local bathymetric chart information.
The LPS is manned on a full time buy a duty watchman, and on the harbour mobile number, which is
promulgated to all users and manned 24/7 and identified as the key contact point. There is no
promulgation of information to the recreational harbours except via local notice boards and limited
information on the council website. 
The LPS Officer should not provide clearance to enter or depart harbour limits and its approaches and
the decision to enter or leave harbour limits and its approaches lies with the Master alone.
No Local Port Services (LPS) training has been undertaken by any of the harbours personnel. However,
it was clear through discussions that the port operatives were not aware of the full scope of the LPS
role and function and did not systematically undertake some of the aspects required of this role. The
port radio is set to listen to Ch12 (Harbour channel). The Duty Watchman and Harbour Master are all
VHF Short Range trained. The Assistant Harbour Master hold a GMDSS CoC.  
The primary method of communication for this information is through the website at
www.moray.gov.uk and is support by the use of VHF radio and mobile telephone communication
systems.
The port website includes publicly available navigational safety and associated information which is
maintained regularly and includes:
• Local port contact details by geographical location, telephone, radio and email;
• Limited Leisure guidelines;
The vessel arrival procedure states the harbour office shall provide the following information; 
• Any reported vessel movements;
• Known, but unreported, vessel movements i.e. yachts, fishing vessels entering port limits and
approach channel;
• Berth occupancy;
• Any AtoN deficiencies;
• Wind speed/direction (except for vessels fitted with remote tidal and wind sensors);
• Tidal height (except for vessels fitted with remote tidal and wind sensors);
• Restricted visibility and adverse weather; and
• Any other relevant information. 
Page 109

Page 110

Formal Safety Assessment to Establish the Requirement for Vessel Traffic Services
Moray Council Harbours   
Moray Council Harbours – Formal Safety Assessment    Page 18 
The Buckie LPS utilises the following equipment in delivery of its functions:
1. Automatic Identification System (AIS) traffic display located in the harbour office which is
linked to publicly available sources;
2. A CCTV system which has a wide coverage of the port facility and the marine area, has viewing
capability in the harbour office and has a recording capability for up to 30 days, noting that:
3. VHF radio communications with a listening watch on Chl 12 and 16. 
Page 110

Page 111

Formal Safety Assessment to Establish the Requirement for Vessel Traffic Services
Moray Council Harbours   
Moray Council Harbours – Formal Safety Assessment    Page 19 
Figure 6. Examples of equipment displays within the Duty Manager’s office.
3.6 Navigational Risk Assessment (NRA)
Moray Council Harbours formally assesses risks and carries out reviews as described in the Harbour
Safety Management System (HSMS), holding a live Navigational Risk Assessment which is managed by
the Harbour Master. Responsibility for the maintenance of up-to-date risk assessments is the
responsibility of the Harbour Master, who ensures that all necessary competent staff and stakeholders
are involved at all stages of assessment and review. 
3.7 Contingency Planning and Emergency Response
Within its Harbour Safety Management System (HSMS), includes the following contingency and
emergency response documents:
• Moray Council Harbours Oil Spill Contingency Plan
• Moray Council Harbours Port Emergency Plan
These contingency and emergency plans, in conjunction with other parts of the Moray Council HSMS,
detail how harbour staff will respond to any marine emergency event.
3.8 Harbour Safety Management System 
Moray Council manage Harbour safety engagement via the following channels;
1. Harbour/Port User Groups 
2. DFT ISPS Port Security Committee meeting 
3. Regular stakeholder engagement with users 
3.9 Future Development
Currently the Buckie Master Plan is progressing through Council funding options, before final design is
drafted/awarded. It should be noted that for any future development the Harbours team should
ensure robust Navigational Risk Assessments are carried out to support ongoing operations but also
development/construction undertakings as the navigational risk may increase depending on
construction methodology.    
Page 111

Page 112

Formal Safety Assessment to Establish the Requirement for Vessel Traffic Services
Moray Council Harbours   
Moray Council Harbours – Formal Safety Assessment    Page 20 
4. Stakeholder Engagement
4.1 Stakeholder Identification
The conduct of an appropriate FSA relies on expert opinion and views gathered from relevant and key
stakeholders. The elicitation of expert opinion from maritime stakeholders also forms a key tenet of
the SIRA model.
Engagement was sought with all of the stakeholders identified and the responses received were
generally productive, relevant and useful. 
1. Moray Council Harbour Master 
2. North West Stevedoring Ltd
3. Buckie RNLO
4. Local Community Councils 
5. MacDuff Shipyard
6. Harbour User Groups 
4.2 Stakeholder Commentary & Findings
Views which were positive, negative or neutral were sought from all relevant marine users who sail in
the harbour limits or its approaches. 
In summary, the engagement with users identified two critical issues – dredging and lighting. Both
areas are critical issues that require changes or improvements as to how Moray Council operates and
communicates with vessels and how it manages the safety of navigation through the LPS. Without
regular maintenance dredging of the harbours the harbour master and LPS Officer will be required to
restrict movements in and out of the harbours using special directions. 
Engagement identified some areas where Moray could review and consider minor changes in
protocols, but the majority of these are for the Harbours to review and do not imply that Moray Council
is not delivering the requirements of its LPS nor managing navigational safety in compliance with legal
requirements and its powers.  
Page 112

Page 113

Formal Safety Assessment to Establish the Requirement for Vessel Traffic Services
Moray Council Harbours   
Moray Council Harbours – Formal Safety Assessment    Page 21 
5. Accidents, Incidents & Near Misses
Accident and incident data has extracted from the management system that holds all safety
information. The data is available for the period 2022 to 2026. The raw data provided has been
assessed and only those accidents and incidents deemed to have relevance to the safety of navigation
have been included within this assessment and following tables.
Table 1 provides the relevant accident and incident data by category recorded.
Incident Category 2023 2024 2025* Total
Grounding  - 1 - 1
Swamping/sinking  1   1
Pollution, Tier 1 - 1 - 1
Mooring 1 1 1 3
Communication Failure 1 - 1 2
Person in the water 1 2  3
High Speed Activity  1 - 1 2
Total 5 5 3 13
Table 1. Incident Data from 2023 to 2026 specifically relevant to navigational safety – by Category. 
Table 2 provides the relevant accident and incident data by the primary cause recorded.
Incident Category Total
Adverse weather 3
Human error 3
Communication failure 4
Unknown 3
Total 12
Table 2. Incident Data from 2019 to 2026 specifically relevant to navigational safety – by Cause. 
Moray Harbours also records accidents and incidents under the following categories, although there
have been no such accidents or incidents deemed to have relevance to the safety of navigation
recorded under these categories during the data period assessed:
• Collison;
• Allisoin;
• Vessel equipment failure;
• Grounding;
• Stranding;
• Sinking and capsizing;
• Weather;
• Availability of berths;
• Availability of anchorages;
• Pilot logistics;
• Port infrastructure delay;
• Pollution Tier 2; and
• Pollution Tier 3.
Page 113

Page 114

Formal Safety Assessment to Establish the Requirement for Vessel Traffic Services
Moray Council Harbours   
Moray Council Harbours – Formal Safety Assessment    Page 22 
It is acknowledged that Moray Harbours has limited incidents and accidents, it would be encouraged
to ensure regular reporting from all users if all near misses and incidents is reported to the Harbour
office. 
Stakeholder engagement did not identify any specific incidents or clear trends in relation  accidents
and incidents at the Harbours, with most stakeholder feedback providing anecdotal evidence of issues.
As such, the level of incidents relative to the size and frequency of operations is considered to be low
in nature and those incidents identified as significant are subject to robust investigation by Moray
Council Harbour and, where necessary, the Marine Accident Investigation Branch (MAIB).  
Page 114

Page 115

Formal Safety Assessment to Establish the Requirement for Vessel Traffic Services
Moray Council Harbours   
Moray Council Harbours – Formal Safety Assessment    Page 23 
6. Vessel Traffic
6.1 Commercial Traffic Buckie 
Vessel traffic data has been provided for Buckie Harbour, covering the period from January 2022 until
December 2025. Over the last 12months there has been a significant reduction in commercial vessel
movements for Buckie Harbour. Table 3 details the total number of recently recorded commercial port
calls made at Buckie Harbour and the figures represent the total number of vessels arriving and
departing the port.
25/26 Q1 25/26 Q2 25/26 Q3 Total
24 24 14 62
Table 3. Annual number of recorded port calls made at Buckie 
Pilotage Movements for Buckie 
25/26 Q1 25/26 Q2 25/26 Q3 Total
12 17 4 33
Table 6. Annual number of pilotage movements at Buckie 
6.2 Other Users
Buckie Harbour and recreational harbours hand a small number of fishing vessels and recreational
traffic. There is no data collected on number of movements for each location. The only available data
movement data is available via 3rd party AIS data providers. 
6.3 Vessel Density Maps
The vessel heat map in Figure 7 provides an overview of traffic as extracted from publicly available AIS
source Marine Traffic.12
The overview shows a high density of traffic which transits to and from the Buckie Harbours, with
Burghead showing mid range density of traffic. 
Figure 7. Vessel Heat Map and key for all vessels. (Extract from www.marinetraffic.com) 
12 Marine Traffic 
Page 115

Page 116

Formal Safety Assessment to Establish the Requirement for Vessel Traffic Services
Moray Council Harbours   
Moray Council Harbours – Formal Safety Assessment    Page 24 
The vessel density maps and data used for this assessment have been taken from the European Marine
Observation and Data Network (EMODnet)13. The dataset is updated every year and this particular
data set was collected over the period 2017 to 2023. The maps are based on AIS data and are extracted
from a GeoTIFF format, show shipping density in 1x1 km cells of a grid covering all EU waters. Vessel
density is expressed as hours per square kilometre per month. 
AIS is compulsory for ships of 300 GT and above on international voyages; for cargo ships of 500 GT
and above not on international voyages; and for all passenger ships regardless of their size. 
For smaller vessels, such as recreational boats, AIS is voluntary and subject to variable compliance,
resulting in incomplete spatial and temporal coverage. As such, the likely incidences and density of
smaller vessels transiting the area will likely be higher than the following density maps indicate. 
Figure 8. Vessel Density 
The EMODnet vessel density maps show no or negligible vessel data in the target area in and around
Harbours for the following vessel categories:
• Military and Law Enforcement;
• Tanker;
• Service;
• High Speed Craft; and
• Unknown. 
13 European Marine Observation and Data Network (EMODnet)
Page 116

Page 117

Formal Safety Assessment to Establish the Requirement for Vessel Traffic Services
Moray Council Harbours   
Moray Council Harbours – Formal Safety Assessment    Page 25 
7. Formal Safety Assessment (FSA)
7.1 Undesirable Scenarios
Table 4 details the undesirable scenarios identified with reference to the SIRA model.
Undesirable Scenario Includes
Grounding Grounding on rock, on soft bottom or on wrecks
Collision Head-on, overtaking, bend, crossing or merging
Contact / Allision Windfarms, oil rigs, wave and tidal energy structures, breakwaters,
aquaculture sites, fixed port infrastructure and aids to navigation
Foundering Capsizing and sinking
Structural Failure Structural failure of a vessel or features external to a vessel
Other  Engine fire, cargo fire, pollution or cargo loss
Table 4. SIRA undesirable scenarios 
Table 5 details the additional undesirable scenarios identified from a review of the NRA.
Undesirable Scenario Includes
Mooring breakout Vessel breaks away from a securely moored position, from a quay, pier
or otherwise anchored position
Loss of vessel control Vessel loses control for any reason including mechanical or equipment
failure, loss of helm control or inability to control its movement
Diving activities Any planned activities involving people or equipment diving below or on
the water surface
Table 5. NRA additional undesirable scenarios 
7.2 Likelihood and Impact
In conducting an assessment of likelihood and impact, in compliance with the SIRA model, the
categorisation of likelihood and impact on navigation have been selected as in Table 6 and Table 7.
Likelihood (LIK)
Categorisation Description
Very Frequent May occur once a week to 6 months
Frequent May occur every 6 months to 1 year
Occasional May occur every 1 to 5 years
Rare May occur every 5 to 20 years
Very Rare Will occur in exceptional circumstances and not more than once every 20 years
Table 6. FSA Likelihood Categories.
Impact (IMP)
Categorisation Description
Catastrophic Long term or permanent suspension of port operations
Major Medium term restrictions to port operations, up to a few months
Severe Temporary restrictions to port operations, up to a few days
Minor Minor impact to safe navigation, up a few hours 
Insignificant Little or no impact on safe navigation
Table 7. FSA Impact on Navigation Categories.
Page 117

Page 118

Formal Safety Assessment to Establish the Requirement for Vessel Traffic Services
Moray Council Harbours   
Moray Council Harbours – Formal Safety Assessment    Page 26 
7.3 Risk Matrix and Scoring
Table 8 provides the Risk Matrix and Table 9 provides the Risk Scoring Descriptions to be adopted in
this FSA.
Impact (IMP) Catastrophic Low Moderate High Very High Very High
Major Low Moderate High High Very High
Severe Low Low Moderate High High
Minor Low Low Low Moderate Moderate
Insignificant Low Low Low Low Low  
Very Rare Rare Occasional Frequent Very
Frequent  
Likelihood (LIK)
Table 8. FSA Risk Matrix.
Very High
Very high and unacceptable risk for which substantial and immediate
improvements are necessary. Major funding may be required, and ports and
waterways may suffer significant impact until such time as the risk has been reduced
to an acceptable level.
High
High risk for which substantial and urgent efforts must be made to reduce it to
ALARP levels within a defined period. Significant funding is likely to be required and
services may be impacted or restricted until risk control options have been actioned.
Moderate Moderate risk must be reduced to the ALARP level, through the implementation of
additional risk control options that are likely to require additional funding.
Low Low risk not requiring additional risk control options unless they can be
implemented at low cost in terms of time, money and effort.
Table 9. FSA Risk Scoring Description.
7.4 Assessment of Undesirable Scenarios
This assessment of undesirable scenarios is undertaken in consideration of all the information and data
collected by way of background and preparation of this FSA. The likelihood and impact are based upon
the assumption of a working LPS at Moray Council Harbours providing the depth and range of local
information as detailed within the HSMS, LPS procedures and as detailed within local navigational
information currently in place, this being:
• LPS coverage manned by competent staff (when required);
• Survey programme in place (improved promulgation required) 
• AtoNs provided which are deemed as fit for purpose (improved promulgation required);
• Local live and predicted data available for wind speed, direction and gusts; tide height; wave
height and tidal flow rate; all available publicly on the website and separately to LPS staff;
• AIS traffic display (marine traffic);
• CCTV display with recording facility; and
• VHF radio monitoring on Chl 12 and 16. 
Page 118

Page 119

Formal Safety Assessment to Establish the Requirement for Vessel Traffic Services
Moray Council Harbours   
Moray Council Harbours – Formal Safety Assessment    Page 27 
Undesirable Scenario Likelihood of
an Incident
Impact on
Safety of
Navigation
Risk Rating
Additional
VTS Controls
Necessary?
Grounding Very Rare Severe Moderate No
Collision Very Rare Major Low No
Contact / Allision Occasional Severe Moderate No
Foundering Very Rare Major Low No
Structural Failure Rare Severe Low No
Other Occasional Minor Low No
Mooring breakout Occasional Minor Low No
Loss of vessel control Occasional Minor Low No
Diving activities Very Rare Severe Low No
Table 10. Assessment of Undesirable Scenarios.
7.5 FSA Findings
The assessment of undesirable scenarios provided for in Table 10, on which is predicated the existing
Moray Council Harbour LPS function, shows that the general risk profile in terms of the safety of
navigation at Harbours is generally Low. 
In the instance of the risk of contact or allision or grounding, which is assessed as being Moderate, it
is the view of this assessment that implementing a VTS is not a justifiable additional mitigation which
would reduce this risk – due to frequency. Other factors, such as on-board protocols detailing the
management of navigation and the appropriate use of the information available from the LPS requiring
review, may form part of the reasons for the frequency of contact or allision events. Individual incident
investigation reports will undoubtedly detail the actions required following singular events, but Moray
Council would be encouraged to review the trend relating to contact or allision events collectively in
order to ascertain if any further steps might be possible to reduce the frequency of incidents.
This finding is supported generally on the basis that:
1. The port mainly deals with recreational craft and currently attracts very little commercial
vessel traffic;
2. There has been no negative feedback or significant concerns raised during the consultation
with stakeholders;
3. The impacts of the majority of past incidents have been minor.
The FSA finds that there is no requirement for a VTS at any of the Moray Council Harbours.  The LPS
facilities and procedures which exist (with some minor improvements) are considered to be
appropriate and fit for purpose in order to ensure the safe and efficient management of navigation
within harbour limits and its approaches, subject to the Harbour ensuring adherence to and
compliance with its own procedures and to Moray Council giving due consideration to the additional
recommendations made as part of this FSA report. 
Page 119

Page 120

Formal Safety Assessment to Establish the Requirement for Vessel Traffic Services
Moray Council Harbours   
Moray Council Harbours – Formal Safety Assessment    Page 28 
8. Conclusions & Recommendations
8.1 Conclusions
In the context of vessel traffic management, the PMSC states that there is a requirement for Harbour
Authorities to assess if VTS should be established in the interests of marine safety, and if not, what
level of LPS is required.
This assessment was carried out with reference to and in compliance with all relevant statutory and
requirements and industry guidance in relation to Formal Safety Assessment (FSA).
Having assessed the harbours baseline condition, engaged with a wide range of relevant stakeholders,
analysed the recent history of navigational accidents and incidents and the marine traffic operating
within the harbour limits and its approaches, reviewed previous navigational risk assessments and
navigational agreements, the requirement for appropriate vessel traffic management functions at
Moray Council Harbours has been analysed. 
The formal safety assessment finds that there is no requirement for a Vessel Traffic Service at Moray
Council Harbours. The Local Port Service facilities and procedures which exist are considered to be
appropriate and fit for purpose in order to ensure the safe and efficient management of navigation
within the harbour limits and its approaches, subject to ensuring adherence to and compliance with
documented procedures and to giving due consideration to the additional recommendations made as
part of this report.
8.2 Recommendations
The primary recommendation from this FSA is that Moray Council Harbour review the findings and
agree a course of action in terms of the provision of a VTS that meets with these findings. The agreed
approach should be fit for purpose for the operation. 
During the course of this FSA a number of points were noted and are recorded in Table 11 below. Each
of these should be considered by the Harbours function and a decision made as to whether and how
to address the issue raised, if at all. 
Page 120

Page 121

Formal Safety Assessment to Establish the Requirement for Vessel Traffic Services
Moray Council Harbours   
Moray Council Harbours – Formal Safety Assessment    Page 29 
Ref Title Description & Recommendation
1 Survey Programme Consider undertaking regular survey programme and promulgating
findings on the harbours website
2 AtoNs Consider having an AtoN maintenance programme in place with a
contractor to assess condition and undertake annual inspections. 
3 AtoNs Consider reviewing AtoN provision on approach to Buckie and
implementing additional AtoNs – including leading light. 
4 Defect Systems Different systems should be formalised 
5 Port weather reader
unit
Review condition and use of the weather unit within the harbour
office. 
6 Tide Gauge  Review requirements for tide gauges at all harbours  
7 NRA and SHA
coverage
Undertake full review of Navigational Risk Assessment documentation
and process. 
8 FSA for VTS Consider the need for ongoing or periodic review of FSA for VTS, as this
need only be carried out if there has been/will be significant changes
at the port. There is no absolute timescale for conducting a FSA or a
review or update to it.
9 VHF
Communications
Review how VHF communications are handled to ensure effective
messaging to other users for all harbours. This includes training
provisions, etiquette and ensuring sets are tuned to listening watch on
Chl 12 and 16. 
10 Enforcement &
Prosecution Policy
The HSMS makes reference to an Enforcement Policy. Moray Council
should review this policy to ensure it aligns with the powers and should
consider publishing the policy statement for users.
11 Byelaws and
General Directions
Consider the review of Byelaws or General Directions, and separation
from the Grampian Confirmation Order create Moray Council HEO. 
Byelaws have not been reviewed since 1990.
12 Harbour Master  Ensure the Harbour Master, Assistants and Duty Watchman are trained
to appropriate level of LPS provision. 
13 Website  Review current harbours website and promulgation of relevant
navigational information – e.g. Notice to Mariners, survey data,
harbour approach information. 
14 Pilotage  Review pilotage across all ports, including amendment to confirmation
order to reflect pilotage is only offered at Buckie Harbour. Also review
Pilot boarding area and non compulsory pilotage with a view to make
pilotage compulsory for all vessels of a certain LOA/GRT. 
Table 11.  FSA Recommendations. 
Page 121

Page 122

Page 122

Page 123

Report to: Harbours Sub
Committee
Meeting Date: 2 June 2026  
Report by: Executive Director Economy, Enterprise and Operations 
Author: Cameron MacPhail  Contact
Email:
cameron.macphail@moray.gov.uk 
Subject: Marine Safety and Operational Summary for Quarter 4 2025/26 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to inform the Harbour Sub Committee (HSC) on matters of
Marine Safety and compliance with the Port Marine Safety Code (PMSC) for Quarter 4
2025/26. 
1.2  This report is submitted to the Harbour Sub Committee in terms of Section III (F) (25) of the
Council's Scheme of Administration relating to the functions of Council as Statutory
Harbour Authority (SHA). 
2.  SUMMARY  
2.1  The report sets out safety and key operational indicators for the harbours, a financial
overview, reports against the Marine Safety Plan KPIs and the progress towards
compliance with the Port and Marine Facilities Safety Code. 
3.  RECOMMENDATIONS 
3.1  It is recommended that the Sub Committee:   
i)  note the reported progress against the KPIs for the Marine Safety Plan 2025-
2028, fulfilling their function as Duty Holder under the Port Marine Safety
Code (PMSC) (para 4.8 and 4.9) and 
ii)  consider the contents of the report 
Cameron MacPhail
Interim Service Manager Harbours 
Item 6.
Page 123

Page 124

4.  PORT & MARINE FACILITIES SAFETY CODE 
4.1  Under the requirements of the Port & Marine Facilities Safety Code (PMFSC) the Council
must appoint a Duty Holder to ensure that compliance with the PMFSC is achieved.  The
council must provide a report on PMFSC performance on an annual basis. 
4.2  The role of Duty Holder is held by members of this HSC.  The role provides accountability
for ensuring the organisation’s compliance with the PMFSC and their organisation’s
performance in ensuring safe marine operations.  This report provides information on
which to base assessment of compliance and safe operations. It should be noted that
duty holders are required to be conversant with PMFSC and its content. Duty Holders
should undergo training to discharge their duty. For those current committee members
who require training or wish refresher training, they can undertake online webinar training
hosted by the British Ports Association. Future training dates have been circulated to the
members of the Harbour Sub-Committee that have yet to conduct this training and they
have booked onto the courses. Dates of Duty Holder training are now recorded in the
Marine Safety Management System, along with operational harbour visits conducted by
Duty Holders. 
4.3  The Harbour Authority appoints a suitably qualified person to act as the Designated
Person (DP) – their function is to provide independent assurance that the Marine Safety
Management System is working effectively and to audit compliance with the PMFSC.  The
DP role is now undertaken by ABPmer following a procurement exercise in 2025. 
4.4  Following the audit by the Designated Person in April 2025, as previously reported, the
harbours team have been working through a number of areas to make sure that full
compliance is achieved. Following the delegation granted to the Head of Operations and
Environment, in consultation with the Chair of the Harbours Sub-Committee at the last
meeting, full compliance was declared to the MCA on 31 March 2026. 
4.5  A glossary of marine terms used in this report is attached at Appendix 1. 
4.6  The Marine Safety Plan 
Following approval of the Marine Safety Plan by this Sub-Committee on 22 October 2025
(para 4 of the minute refers), the agreed KPIs for the 2025-2028 period are shown in the
table below with the latest results. The plan is based upon marine safety management
requirements, conservancy requirements, compliance requirements, the financial
situation, growth potential, harbours user and community consultation. 
1. Full compliance with the
Port Marine Safety Code. 
KPI indicator:  No non compliances reported
against the PMSC audit. 
Update April 2026 No non compliance against PMSC
2. Incident reporting improved.  KPI indicator:  Improved near miss
reporting methodologies with
better public access to reporting
systems. 
Update April 2026 Significant improvement in
reporting.  New internal incident
logging system in place to improve
recording and investigations. 
Page 124

Page 125

Incidents investigated within 2
weeks of the date reported. 
Update April 2026 All incidents investigated within
time limit.
3. Harbour
infrastructure maintained to
ensure all commercial
contracts can be fulfilled. 
KPI indicator:  No reported delays to commercial
contracts due to infrastructure
issues. 
Update April 2026 No reported issues    
AtoN availability in accordance
with NLB reporting requirements 
Update April 2026 AtoN availability is currently at
100% for quarter.  3 year rolling
NLB availability last reported an
average across all sectors of 98.8%    
Commercial quayside lighting at
100% availability 
Update April 2026 100% availability    
Pilot boat availability at 95%. 
Update April 2026 100% availability    
Commercial quays and
approaches dredged to declared
depths for commercial customers. 
Update April 2026 100% availability
4. Harbour staff competent in
their core roles. 
KPI indicator:  Competence matrix measured at
competent or awaiting
assessment, for all staff with more
than six months service. 
Update April 2026 100% for the quarter – training
requirements for 26/27 submitted    
All Duty Holders completed training
within 6 months of appointment 
Update April 2026 As previous reports
5. Traffic management reviews
conducted for all harbours, to
minimise risk between all types
of harbour user. 
KPI indicator:  Traffic management reviewed by
March 2027. 
Update April 2026 In progress    
Actions from traffic management
plans in place by March 2028. 
Update April 2026 In progress
6. Harbours Website updated.  KPI indicator:  New website to include all
relevant compliance,
navigational and conservancy
information, including the MSP
and reported progress against
the plan. 
Update April 2026 In progress
7. Leisure berth occupancy
maximised 
No unsold leisure berths 
Update April 2026 Zero unsold berths
Page 125

Page 126

Waiting lists numbers above zero
for all harbours 
Update April 2026 Waiting list in place
8. Harbour quayside space
used to maximise, safety,
community benefit and income
at all harbours. 
One improvement or service
provided following suggestions by
the relevant Harbour User Groups,
implemented at, Burghead,
Hopeman, Findochty, Portknockie
and Cullen Harbours by March
2027. 
Update April 2026 Alternative storage sites
being sought to free up quayside
space for initiative options 
5. FINANCIAL REPORT 
5.1 Year end financial information was not available at the time of finalising this report. An
update will be provided at the next meeting of the Sub Committee 
6. OPERATIONAL REPORT 
6.1 Operational Report 
Incidents Reported 
2024/25 Injuries Incidents Near Misses
Q1 0 2 0
Q2 1 0 0
Q3 0 1 0
Q4 0 0 0
Total 1 3 0
2025/26   
Q1 0 0 0
Q2 1 0 0
Q3 0 0 0
Q4 0 1 3
Total 1 1 3 
6.2 Incident reporting and near miss reporting remains low but noted a significant
improvement in reporting by users. Initiatives recently communicated to harbour users
has seen one incident and three near misses reported. 
6.3 One reported incident of a leisure vessel grounding while entering Cullen harbour, and
three near misses including concerns raised for children playing on old, abandoned boats
that, while not on harbour land, the harbours team tried to help given the concern that was
raised.  The MSP includes and monitors this initiative, reporting accordingly. 
Page 126

Page 127

6.4 Harbour Noticeboards have been updated to encourage users to report any incidents and
near misses. The forthcoming harbours website development will also promote a positive
safety and reporting culture. 
6.5 Pilotage
Pilotage is not compulsory at Buckie harbour, or any Moray Council Harbour, and therefore
not all cargo movements require the services of a pilot. The number of pilotage acts
carried out in the last 6 months is: 
Period Vessel movements Piloted vessel movements   
FY 25/26 Q1 24 12
FY 25/26 Q2 24 17
FY 25/26 Q3  14 4
FY 25/26 Q4 6 2 
6.6 In order to increase resilience in pilotage the harbour management team a new trainee
pilot has been engaged but due to lack of vessel movements limited pilot trips have been
undertaken. Currently there is one authorised pilot (daytime only) and two trainee pilots. 
6.7 The harbour workboat, which is also coded for pilot boat use, is fully operational.  
6.8 Commercial shipping numbers remain low. Buckie harbour will handle three cruise
vessels for season 2026 with the first having taken place on the 17 April 2026 and the next
due on 24 May and 19 June.  The export of timber from basin 1 will continue with 1 vessel
having visited and another 2 planned for the near future. This may see an increase in
pilotage activity.   
6.9
Staffing, Training and Competence 
Harbours staff training requirements for 2026/2027 complete and issued. Key focus area is
to support the current Harbour Master to achieve their Harbour Master certification and
support the Selkie full time engineer to attain their Advanced Powerboat certification to
support the ongoing manning on the Selkie.   
6.10 Staffing of the work/pilot boat remains a challenge. The forthcoming training requirement
for 26/27 includes staff training to mitigate this issue. A solution to improve the pool of
staff available is being progressed in the same way as the pilot position. This is in
accordance with the staff competency matrix which is now linked to National
Occupational Standards for the sector. 
6.11 A challenge remains retaining competence and experience agency staff for the regular
Selkie operational requirements. 
6.12 Watchman on Duty 24/7 request a review of working pattern. Amendment by the team was
previously suggested but no formal outcome. Currently the watchmen operate continental
shifts (8hrs) and request review of 12hr shifts. 
Page 127

Page 128

7. CONSERVANCY 
7.1 Aids to Navigation 
The tables below summarise the availability of Navigational lights under Moray Council’s
responsibility.  All navigation lights across all harbours are either solar powered or run
through the street lighting systems.  There is a new sector light to be installed in Buckie to
complete the changes which will be powered by mains power- cable to be installed. 
Figure 1. Availability during the last 12 months 
7.2 The ‘Availability Objective’ is calculated over a rolling 36 month period. This means that
over this period a Cat 1 Aid to Navigation needs to be functional for 99.8% of the time, Cat
2 Aids to Navigation 99%. 
7.3 Now that all the navigation light faults have been rectified and the new solar lights have
been installed, the required availability has now been achieved over the last 12 months,
yet it will take some time for the 36 month average target availability to be attained. 
7.4
Dredging 
MV Selkie has completed her 5 yearly MCA recertification – including in water and out
water surveys by the MCA . The Selkie refloated off the slip at Buckie on 8 April.  Works
carried out during 5 yearly inspection included; 
• Engine shaft inspections and new shaft seals installed
• Replacement life raft installed 
• Excavator underwent annual overhaul
• LOLER inspections carried out
• Antifoul and paint, including replacement of required anodes
• Inspection of drills and certification 
7.5 There are no reported defects with the excavator during the last quarter.  The inspection
regime has been increased to monthly and components identified to be at risk of failure
(the main cause of breakdown) are now exchanged prior to failure, outside of the crewed
the operational cycle of the vessel. 
7.6 This improves vessel availability and the cost efficiency per tonne of dredged material. The
aim is to also improve operational availability. Moray Council Fleet services currently 
Page 128

Page 129

support the inspection, planned maintenance and repair of the excavator and has planned
dates to attend and undertake inspections until October 2026. 
7.7 Dredger working Days
Year Working
Days 
Weather
Delay Days 
Maintenance
Days 
Working
Day % 
Tonnage
Removed
25/26  70 22 43 52 11180
24/25 32 12 91 24 9012
23/24 62 58 28 42 8472
22/23 94 68 46 46 12880
21/22 77 62 59 39 14120
20/21 38 14 47 39 11240 
The dredging requirement for all harbours was kept under continuous monitoring by the
Harbour Master for any requirements.   
7.8 Tonnage removed per harbour during 2025/26 YTD 
Harbour  Q1 Q2 Q3 Q4
Buckie  1360 4400 1160 0
Burghead 400 2020 0 0
Findochty 0 1000 0 0
Portnockie 0 240 600 0
Hopeman 0 0 0 0
Cullen 0 0 0 0 
7.9 Dredging at Buckie is to contracted depth and regularly checked by the harbour staff.     
7.10 A dredge campaign for all harbours has been detailed by the Harbour Master and
commenced on 20 April 2026 at Buckie Harbour. The current dredge programme consists
of 34 days, commencing April 2026. Total dredge volumes expected to be in the region of
4000t. 
7.11 The operational ambition remains to lower the depth of the approaches, then resurvey
prior to submitting the survey data and updating the charted depth. Then to maintain this
lower depth and the accessibility of the harbour at as wide a range of the tide as is
practicable. 
7.12 On completion of current dredge programme a full bathymetric survey of all harbours shall
be undertaken and promulgated to users. This will also allow a full review of current
depths to be assessed, and areas identified for further dredging. 
7.13 An application for land based dredging and beach replenishment disposal is being
progressed for Hopeman harbour. 
7.14 Successful 3rd party dredge campaign delivered by the Selkie at Perth Harbour on behalf of
client. 2.5 days undertaking dredging for client evidenced the capabilities of the Selkie to
deliver external contracts 
Page 129

Page 130

7.15 There have been approaches to carry out works for other harbours which have been
accepted with a planned dredge programme late June/early July 2026. Moray Harbours
dredge programme will remain a priority before external dredge contracts. 
7.16
Infrastructure 
The capital plan is addressing the harbour wall infrastructure issues raised by the routine
periodic surveys. Some further items of infrastructure may need to be brought into this
routine survey programme, such as bollard surveys. This will add additional pressure to
the maintenance budget. 
7.17 The recent engineering survey at Portknockie exposed greater structural degradation of
middle pier than expected. It is intended to restrict access to berth holders only whilst
repairs are pending due to the uneven surface. 
7.18 The ends of the west and north quays at Cullen are also showing signs of structural
degradation following recent storms. Again, access may need to be restricted for safety
reasons whilst the extent of the required repairs is assessed. If this presents any material
restriction for users then appropriate comms with harbour users and councillors will be
put in place. 
7.19 Buckie Harbour weighbridge installation requires additional works to ensure connectivity
between weighbridge and office. 
7.20 Buckie Harbour Pier 1 joint repairs ongoing. Work to the repairs delayed due to timber
cargo shipment at berth 1. 
7.21  Harbours team continue to undertake regular inspections of assets and undertake minor
maintenance and pressure washing of pontoons. 
8. OTHER UPDATES 
8.1 Service Manager – Harbours: recruitment is underway to identify a substantive postholder,
with interviews scheduled for 18 May 2026. A verbal update will be provided to Sub
Committee. 
8.2 Buckie Harbour Masterplan: an application has been made to the Just Transition Fund
including a request for funding to progress design and business case to deliver an
expanded harbour in line with the Masterplan. Oversight of the Masterplan remains within
the remit for Economic Development and Infrastructure Services Committee. 
8.3 Stakeholder Visits: There have been various events used to raise the profile of Moray’s
Harbours, and the case for delivery of the Masterplan during Quarter 4, including a visit by
the Scottish Government Place Director for Moray’s Community Planning Partnership, and
a visit to the Buckie area by HRH Duke of Gloucester. 
9. SUMMARY OF IMPLICATIONS 
9.1 The table below shows whether risks and implications apply if the recommendations are
agreed: 
Page 130

Page 131

SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  x
Policy and Legal x 
Financial x 
Risk x 
Staffing  x
Best Value and Transformation  x
Property x 
Information Communications Technology/Digital            x
Equalities. Social Inclusion and Economic Impact            x 
Climate Change and Biodiversity Impact  x 
9.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following
Council Plan strategic priorities:
☐ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report
support and contribute to improved outcomes for communities as outlined in the
following Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☐ Improving wellbeing of our population   
9.3 Policy and Legal 
The Council aims to run the harbours in compliance with the PMSC and within the
legislative framework set out for harbours. Non compliance with the code will have legal
implications.  
9.4 Financial 
Non compliance with the code may have financial implications. 
9.5 Risk 
Non compliance with the PMSC could result in the prosecution of the authority. 
9.6 Staffing 
There are no staffing implications arising from the report.  
9.7 Best Value and Transformation 
N/A  
9.8 Property 
No property implications arise from the report.
Page 131

Page 132

9.9 Information Communications/Technology/Digital 
No ICT implications arise from the report.  
9.10 Equalities, Social Inclusion and Economic Impact  
There are no implications arising directly from this report.  
9.11 Climate Change and Biodiversity Impacts 
There are no climate change and biodiversity implications arising from this report. 
10. CONSULTATION  
10.1 This report has been prepared in consultation with the Executive Director Economy,
Enterprise and Operations, Head of Operations and Environment, Service Manager Legal
Services, Senior Engineer (Flood Risk Management), Principal Climate Change Officer,
Equalities Officer and L Rowan, Committee Services Officer and any comments made
have been incorporated into the report 
11 BACKGROUND PAPERS  
11.1 N/A   
Page 132

Page 133

Appendix 1 – Glossary 
Word / Abbreviation Meaning
Aid to Navigation any device, system, or service, external to
a vessel or aircraft, designed to enhance
safe and efficient navigation by helping
mariners determine their position,
determine a safe course, or warn them of
dangers and obstructions. Common
examples include buoys, lighthouses,
beacons, and electronic signals (AIS)
Chart Datum Chart Datum is defined as the sea level
that is so low the tide will not frequently
fall below it. In the United Kingdom, this
level is typically the level of the Lowest
Astronomical Tide
Conservancy The duty of a harbour authority to
maintain a port or harbour in a condition
that is safe for navigation. This duty
requires ensuring the harbour is fit for use
by vessels and providing users with
necessary information about conditions,
such as depths and hazards
DP / Designated Person an independent individual or organization
appointed by a port or harbour authority
to provide assurance that their marine
safety management system is working
effectively and is compliant with national
standards
LOA Length Overall - the maximum length of a
vessel's hull measured parallel to the
waterline, from the foremost point of the
bow to the aftermost point of the stern
LOLER Lifting Operations and Lifting Equipment
Regulations 1998, a set of UK safety
regulations designed to ensure that
equipment used to lift people or loads is
safe, properly planned, and thoroughly
examined
MCA Maritime and Coastguard Agency 
MSMS Marine Safety Management System
(occasionally referred to a HSMS /
Harbour Safety Management System)
PMSC Port and Marine Facilities Safety Code
SOSREP Secretary of State’s Representative: a
skilled and experienced individual with
full authority of government to provide
strategic oversight of a maritime incident
on behalf of Government. 
Page 133

Page 134

Page 134