Harbours Sub-Committee 
Tuesday, 17 March 2026 
NOTICE IS HEREBY GIVEN that a Meeting of the Harbours Sub-Committee is to be
held at Council Chambers, Council Office, High Street, Elgin, IV30 1BX on Tuesday,
17 March 2026 at 09:30. 
BUSINESS 
1. Sederunt 
2. Declaration of Group Decisions and Members Interests * 
3. Minute of Meeting dated 4 December 2025 5 - 6
4. Written Questions ** 
5. Marine Safety and Operational Summary for Quarter 3 2025-
26
Report by Executive Director Economy, Enterprise and Operations  
7 - 20 
Summary of Harbour Sub Committee Functions:
To fulfil the role of Duty Holder as described in the Port Marine
Safety Code, and to provide strategic oversight and direction for
harbour operations, giving greater focus and clarity on the
Council’s role as harbour authority.   
Page 1

Page 2

Watching the Meeting
You can watch the webcast live by going to: 
http://www.moray.gov.uk/moray_standard/page_43661.html    
Webcasts are available to view for 1 year following the meeting.  
You can also attend the meeting in person.  If you wish to attend
in person, please come to the High Street entrance door and a
member of staff will let you into the Chamber. 
Page 2

Page 3

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how the
individual or members of the group will vote on any item(s) of business on the
Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any relevant
and competent business within the specified remits not already on the agenda, to
the Chair provided it is received by the Proper Officer or Committee Services by
5pm three working days prior to the day of the meeting, please see Standing Order
36 for deadlines.  A copy of any written answer provided by the Chair will be
published on the Council’s committee management system by 12pm the day
before the meeting.  The Member who has put the question may, after the answer
has been published, may ask one supplementary question directly related to the
subject matter at the meeting, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the consent
of the Chair. If a Member does not have the opportunity to put a supplementary
question because no time remains, then he or she can submit it in writing to the
Proper Officer who will arrange for a written answer to be provided within 7
working days. 
Page 3

Page 4

MORAY COUNCIL 
Harbours Sub-Committee 
SEDERUNT 
Councillor Marc Macrae  (Chair)
Councillor Amber Dunbar  (Depute Chair)  
Councillor James Allan  (Member)
Councillor Neil Cameron  (Member)
Councillor Tracy Colyer  (Member)
Councillor Sonya Warren  (Member)  
Clerk Name: Lissa Rowan
Clerk Telephone: 01343563015
Clerk Email: lissa.rowan@moray.gov.uk 
Page 4

Page 5

MORAY COUNCIL 
Minute of Meeting of the Harbours Sub-Committee 
Thursday, 04 December 2025 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor James Allan, Councillor Neil Cameron, Councillor Amber Dunbar,
Councillor Marc Macrae, Councillor Sonya Warren 
APOLOGIES 
Councillor Tracy Colyer 
IN ATTENDANCE 
Head of Operations and Environment; Service Manager Harbours; and L Rowan,
Committee Services Officer.   
1         Chair 
Councillor Macrae chaired the meeting. 
2         Declaration of Group Decisions and Members Interests 
In terms of Standing Orders 21 and 23 of the Councillors’ Code of Conduct, there
were no declarations from Group Leaders or Spokespersons in regard to any prior
decisions taken on how Members will vote on any item on the agenda or any
declarations of Member’s interests in respect of any item on the agenda.    
3         Minutes of meeting dated 22 October 2025 
The Minute of the meeting of the Harbour Sub Committee dated 22 October 2025 was
submitted and approved subject to the year at paragraph 4 (v) being changed to 2025-
2028.  
4         Written Questions 
The Committee noted that no written questions had been submitted.    
5         Marine Safety and Operational Summary for period 2025 Q2 to 31 October 
Item 3.
Page 5

Page 6

The meeting had before it a report by the Executive Director Economy, Enterprise and
Operations informing the Committee on matters of Marine Safety and compliance
with the Port Marine Safety Code (PMSC) for the year 2025/26 Q2 and part of Q3 until
31 October 2025.  
The Committee sought an update on a number of points in the report including
progress on harbour operations, finances and Port Marine Safety Code compliance
and assurance was provided from the Head of Operations and Environment that full
compliance will be achieved by March 2026.   
In relation to Buckie Pier 1, the Service Manager for Harbours advised that repair
works are imminent and scheduled for completion within the current financial year
and that physical access restrictions will be installed on the unsafe section of Buckie
North Pier to manage safety risk.   
With regard to dredging performance, it was noted that dredging targets had been
met and that the replacement of the dredger will be brought forward for capital
consideration early in 2026.  It was further noted that maintenance of the dredger and
its reliability had significantly improved in recent months.   
Concern was raised in relation to gear which had been dumped at Buckie Harbour
and the Service Manager for Harbours advised that costs and timescales for removal
of the dumped gear were being development and a new enforcement policy is being
finalised with Legal Services which will be brought to the Committee for approval in
due course.   
The Committee further noted a proposed 5% inflationary increase to harbour fees
and charges ahead of consultation with harbour user groups and the Committee
encouraged harbour users to take part in the consultation so that their views can be
taken into consideration.  
Thereafter, the Committee joined the Chair in thanking the Harbours Service for their
excellent work across both commercial and leisure harbours and thereafter agreed to
note the: 
(i) actions taken against achieving compliance with the PMSC as set out in
paragraph 4.7 of the report; 
(ii) reported progress against the KPIs for the Marine Safety Plan 2025-2028,
fulfilling their function as Duty Holder under the Port Marine Safety Code
(PMSC) as set out in paragraph 4.8 & 4.9 of the report;
(iii) Schedule of Fees and Charges for the 2026/2027 financial year as set out in
paragraph 5.7 and Appendix 1 of the report and recommend their adoption to
full council for approval; and
(iv) harbours financial position as set out in Section 5, operations activity report as
set out in Section 6, and conservancy reports as set out in Section 7 of the
report.     
Page 6

Page 7

Report to: Harbours Sub
Committee
Meeting Date: 17 March 2026  
Report by: Executive Director Economy, Enterprise and Operations 
Author: Cameron MacPhail  Contact
Email:
cameron.macphail@moray.gov.uk 
Subject: Marine Safety and Operational Summary for Quarter 3 2025/26 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to inform the Harbour Sub Committee (HSC) on matters of
Marine Safety and compliance with the Port Marine Safety Code (PMSC) for Quarter 3
2025/26. 
1.2  This report is submitted to the Harbour Sub Committee in terms of Section III (F) (25) of the
Council's Scheme of Administration relating to the functions of Council as Statutory
Harbour Authority (SHA). 
2.  SUMMARY  
2.1  The report sets out safety and key operational indicators for the harbours, a financial
overview, reports against the Marine Safety Plan KPIs and the progress towards
compliance with the Port and Marine Facilities Safety Code. 
3.  RECOMMENDATIONS 
3.1  It is recommended that the Sub Committee:   
i)  consider and note the actions taken against achieving compliance with the
PMSC (para 4.7 ); 
ii)  delegate authority to the Head of Operations and Environment in
consultation with the Chair of Harbours Sub-Committee to declare full or
partial compliance (based on evidence no later than 30 March 2026) with the
Port & Marine Facilities Safety Code by 31 March 2026; 
iii)  note the reported progress against the KPIs for the Marine Safety Plan 2025-
2028, fulfilling their function as Duty Holder under the Port Marine Safety
Code (PMSC) (para 4.8 and 4.9); and
Item 5.
Page 7

Page 8

iv)  note the harbours financial position (paragraph 5), operations activity report
(paragraph 6), and conservancy reports (paragraph 7).   
Cameron MacPhail
Interim Service Manager Harbours 
4.  PORT MARINE SAFETY CODE 
4.1  Under the requirements of the Port & Marine Facilities Safety Code (PMFSC) the Council
must appoint a Duty Holder to ensure that compliance with the PMFSC is achieved.  The
council must provide a report on PMFSC performance on an annual basis. 
4.2  The role of Duty Holder is held by members of this HSC.  The role provides accountability
for ensuring the organisation’s compliance with the PMFSC and their organisation’s
performance in ensuring safe marine operations.  This report provides information on
which to base assessment of compliance and safe operations. It should be noted that
duty holders are required to be conversant with PMFSC and its content. Duty Holders
should undergo training to discharge their duty. For those current committee members
who require training or wish refresher training, they can undertake online webinar training
hosted by the British Ports Association. Future training dates have been circulated to the
members of the Harbour Sub-Committee that have yet to conduct this training and they
have booked onto the courses. Dates of Duty Holder training are now recorded in the
Marine Safety Management System, along with operational harbour visits conducted by
Duty Holders. 
4.3  The Harbour Authority appoints a suitably qualified person to act as the Designated
Person (DP) – their function is to provide independent assurance that the Marine Safety
Management System is working effectively and to audit compliance with the PMFSC.  The
DP role is now undertaken by ABPmer following a procurement exercise in 2025. 
4.4  The PMFSC was revised and updated on 15 April 2025. Moray Council must now
demonstrate compliance against the revised PMSC. It should be noted the updated
PMFSC code is much more prescriptive in how harbours and facilities now “must” or
“shall” be managed and operated, where previously it advised they “should” or “may” be
operated. This change of emphasis has caused the need for the Marine Safety
Management System to be further developed to achieve full compliance with the code.
The audit report covers 179 areas, has 114 compliant areas, 51 recommendations and 14
areas of non-compliance with the PMSC, including the need for a new Marine Safety Plan.
It also highlights two areas identified as best practice.  A declaration of compliance (or
partial compliance) with the PMSC should be lodged with the Maritime and Coastguard
Agency (MCA) between 1 January 2026 and 31 March 2026. The aim remains to achieve full
compliance with the PMSC so this can be reported as such to the MCA during this period.
Whilst significant progress has been made, due to resourcing constraints it may not be
possible to close out all areas identified as non-conformities in the audit prior to 31 March
2026. If this is the case then partial compliance will be declared. Those areas that remain
outstanding, whilst important, do not have a direct or immediate consequence on marine
safety. It is requested that to allow maximum time to close out as many actions as
possible that the Sub-Committee delegates authority to the Chair and Head of Operations 
Page 8

Page 9

& Environment to submit a letter of compliance or partial compliance by 31 March 2026
and update the Sub-Committee accordingly. 
4.5  There were no injuries, incidents or near misses recorded in Quarter 3. 
4.6  Summary of non-compliances raised in the April 2025 PSMC audit 
Subject Evidence required for
compliance
Recommendations Current compliance
status
Assessment
of Vessel
Traffic
Management
using Marine
Guidance
Note (MGN)
401 (MCA,
2022)
Has a Formal Risk
Assessment (FRA) been
conducted into the
requirement for a Vessel
Traffic Service. 
An FRA needs to be
conducted to
determine the level
of Vessel Traffic
Management
required at each of
the harbour areas. 
Risk Assessments and
Operational procedures
to be updated. 
Work commenced.
Target date: 31/03/26
Dangerous
Vessels
If the Organisation is a
Harbour Authority, are
powers to issue
Dangerous Vessels
Directions by the
Harbour Master
included in the MSMS?
A detailed
procedure should
be produced. 
Dangerous Vessel policy
and procedure to be
written and integrated
into the MSMS.
Ensure required staff
knowledge is captured on
competency records.
Staff trained and
assessed. 
Target date: 31//03/26
Pilotage
Competent
Harbour
Authority
(CHA)
Has an FRA been
conducted into the
requirement for
Pilotage?  Is the
Organisation a CHA?
An FRA for the
requirement of
pilotage should be
conducted for all
harbours. 
FRAs to include an
assessment for all
harbours and update the
Buckie FRA to clarify the
Buckie pilotage
jurisdiction. 
Work commenced
Target date: 31/03/26
MSMS
Accountability
Officers
Does the MSMS define
the appointment of
Officers and their
delegated powers,
duties and
responsibilities?  
Include
descriptions for
each of the roles in
the Organisation
Chart.  
MSMS updated for Duty
Holder approval. 
Complete.
Enforcement
Policy
Is there clear policy on
enforcement and
prosecution?
A policy on
enforcement must
be produced and
approved by the
Duty Holder.  
Enforcement policy
drafted and with legal
service for verification
prior to being brought to
Duty Holder for approval
and integration into the
MSMS. 
Work commenced
Target date: 31/03/26 
Page 9

Page 10

MSMS review Does the MSMS
incorporate a regular
and systematic review of
its performance?
The MSMS must
incorporate a
regular and
systematic review
of its performance.  
MSMS updated to include
a review policy for Duty
Holder approval. 
Complete.
Competence
(Trained,
Qualified,
Experienced)
Are National
Occupational Standards
(NOS), or an equivalent,
used in recruiting and
training?
NOS, or an
equivalent, should
be reviewed and
applicable
elements
incorporated.
Competencies for tasks
conducted by harbours
staff created and
reference against NOS
where possible. 
Complete. 
Is there a methodology
for assessing personnel
against the set
standards?
To ensure that
competent persons
are employed
Moray Council
should develop an
assessment
methodology.
Competency matrix for
staff developed. 
Complete. 
Are existing staff
reviewed to ensure they
meet the standards set?
NOS or an
equivalent should
be reviewed and
applicable
elements
incorporated.
Competency matrix for
staff developed. 
Complete.
Publication of
a Marine
Safety Plan
(MSP)
Has the Organisation
published a MSP?
In order to comply
with this ‘Key
Measure’ the
Marine Safety Plan
needs to be clearly
published.
Marine Safety Plan with
KPIs submitted to Duty
Holder for approval. 
Complete.
MSP Review Is the MSP reviewed and
is this review published?
The review
requirements
around the MSP
should be captured
within the HSMS.
MSMS re-drafted to define
review procedure and
periodicity. 
Complete.
MSP Timing Is the MSP in date and
within its three-year
period?
The outdated MSP,
should be reviewed
and a new plan
published.
MSP submitted for Duty
Holder approval. 
Complete.
Conservancy
Introduction
Are the marine facilities
in good repair and fit for
purpose?
The Council should
consider its
responsibility under
The Workplace
(Health, Safety and
Welfare)
Regulations 1992.
There is an inspection
plan for harbour facilities
and structures against the
asset register. It is current
practice to log defects
and prioritise repairs.
Need to consider closing
unsafe areas until
repaired. 
Complete.
Harbour
Authority
Buckie North Quay
surface condition
severely deteriorated.
Poses risk to staff
and users
Priority 1 repair
requested. Area requires
Page 10

Page 11

Conservancy
Duty
accessing that part
of the harbour.
closed to pedestrians and
vehicles. 
Risk to be managed
compliantly pending full
repair.
Harbour
Authority
Conservancy
Duty
Is there a Harbour
Authority' recognition of
the ‘duty to conserve’
and/or ‘reasonable care’
statement?
Add a statement
regarding the
Council’s legal
duties to the HSMS.
Statement added to
MSMS revision. 
Complete. 
4.7  The Marine Safety Plan 
Following approval of the Marine Safety Plan by this Sub-Committee on 22 October 2025,
the agreed KPIs for the 2025-2028 period are shown in the table below with the latest
results. The plan is based upon marine safety management requirements, conservancy
requirements, compliance requirements, the financial situation, growth potential,
harbours user and community consultation. 
Moray Harbours MSP 2025-2028 
1. Full compliance with the
Port Marine Safety Code.
KPI indicator: No non compliances
reported against the PMSC
audit. 
Update March 2026 4 Non-compliance actions
outstanding.
2. Incident reporting
improved.
KPI indicator: Improved near miss reporting
methodologies with better
public access to reporting
systems. 
Update March 2026 Public and staff online
reporting system in design
stage.  
Incidents investigated within
2 weeks of the date reported. 
Update March 2026 All incidents investigated
within time limit.
3. Harbour infrastructure
maintained to ensure all
commercial contracts can be
fulfilled.
KPI indicator: No reported delays to
commercial contracts due to
infrastructure issues. 
Update March 2026 All contracts running
smoothly.  
AtoN availability in
accordance with NLB
reporting requirements. 
Update March 2026 AtoN availability is currently
100% but will take 36 months
to achieve full NLB
compliance. 
Page 11

Page 12

Commercial quayside
lighting at 100% availability. 
Update March 2026 At 100% for the quarter.  
Pilot boat availability at 95%. 
Update March 2026 At 100% for quarter.  
Commercial quays and
approaches dredged to
declared depths for
commercial customers. 
Update March 2026 At 100% for the quarter
4. Harbour staff competent in
their core roles.
KPI indicator: Competence matrix
measured at competent or
awaiting assessment, for all
staff with more than six
months service. 
Update March 2026 At 100% for the quarter  
All Duty Holders completed
training within 6 months of
appointment. 
Update Nov 2025 5/6 Duty Holders trained
5. Traffic management
reviews conducted for all
harbours, to minimise risk
between all types of harbour
user.
KPI indicator: Traffic management reviewed
by March 2027. 
Update March 2026 Buckie TMP delayed to Q1
26/27.  
Actions from traffic
management plans in place
by March 2028. 
Update March 2026 To follow
6. Harbours Website
updated.
KPI indicator: New website to include all
relevant compliance,
navigational and
conservancy information,
including the MSP and
reported progress against the
plan. 
Update March 2026 Collating data ready for
website update. Small
amendments made to
current information.
7. Leisure berth occupancy
maximised. 
No unsold leisure berths. 
Update March 2026 Zero unsold berths.  
Waiting lists numbers above
zero for all harbours. 
Update March 2026 All waiting lists have above
20 names.
8. Harbour quayside space
used to maximise, safety,
community benefit and
income at all harbours. 
One improvement or service
provided following
suggestions by the relevant
Harbour User Groups,
implemented at, Burghead,
Page 12

Page 13

Hopeman, Findochty,
Portknockie and Cullen
Harbours by March 2027. 
Update March 2026 Alternative storage sites
being sought to free up
quayside space for initiative
options. 
5. FINANCIAL REPORT 
5.1 Financial report
A summary of the financial position of the harbours revenue and capital plans is included
below. This years’ capital figures are broken down by task. 
5.2 Harbours Revenue Income and Expenditure 
All Harbours revenue figures to the end of December 2025. 
Annual Budget Budget to 31/12 Actual at 31/12 
Income  (£1,192,696)  (£943,907)  (£879,339)
Expenditure  £945,611  £560,720  £690,345
Net   (£247,085)  (£383,187)  (£188,894) 
5.3 Income remains lower than budget, primarily due to a reduced malt cargo imports relating
to changes in the supply chain demand. The principal expenditure variances relate to
insurance excess payments for historic claims and expenditure that should be recharged
to capital. 
5.4 Harbours capital expenditure plan for 2025/26 
Project  Approved Budget  Spend to date  Notes 
Buckie navigation
light. 
£125,000  £109,450  Works completed.
Risks re allocated
budget were not
realised. 
Buckie weighbridge.   £22,000  £22,000  Works complete.
Weighbridge
operational. 
Buckie Pier 1 joints.  £124,000  £32,000  Due to complete by
31/03/26
Burghead sheet pile
repairs. 
£245,000  £218,310  Work complete. 
Portknockie north
wall repairs. 
£114,000  £95,720  Work complete. 
Page 13

Page 14

Portknockie middle
pier repair design. 
£35,000  £17,000  Survey and design
report received. 
Portknockie pontoon
replacement design
work.
£33,000  £0   Design works to be
initiated Q4.
Cullen West Pier
survey and repair
design.
£49,000 £0 Work scheduled for
Q4. 
5.5 Capital expenditure is aligned with the identified engineering projects which are
scheduled following routine inspection and condition reports. The completed works
include the replacement Buckie navigation light, an extension to the Buckie weighbridge
platform, the Portknockie north wall repairs and the Burghead inner quay sheet piling
repairs. The Buckie pier one repairs have been carried out.  An engineering report to
establish the condition of the Portknockie middle pier identified extensive further works
are required. A new survey of Cullen west pier and the north pier, commissioned after new
movement was observed in the structures following the last storm, has identified that
significant additional structural repairs are required. The feasibility works have been
added to the capital works plan. 
6. OPERATIONAL REPORT 
6.1 Operational Report 
Incidents Reported 
2024/25 Injuries Incidents Near Misses
Q1 0 2 0
Q2 1 0 0
Q3 0 1 0
Q4 0 0 0
Total 1 3 0
2025/26   
Q1 0 0 0
Q2 1 0 0
Q3 0 0 0 
6.2 Incident reporting and near miss reporting remains low. Initiatives to increase the level of
near miss reporting, as well as the reporting of incidents, will be sought, advertised to
users and implemented. The MSP includes and monitors this initiative, reporting
accordingly. Harbour Noticeboards have been updated to encourage users to report any
incidents and near misses. 
6.3 Pilotage
Pilotage is not compulsory at Buckie harbour, or any Moray Council Harbour, and therefore
not all cargo movements require the services of a pilot. The number of pilotage acts
carried out in the last 6 months is: 
Page 14

Page 15

Period Vessel movements Piloted vessel movements   
FY 25/26 Q1 24 12
FY 25/26 Q2 24 17
FY 25/26 Q3  14 4
6.4 In order to increase resilience in pilotage the harbour management team is seeking to
expand the relief pool of available qualified pilots. A new trainee pilot has been engaged
but due to lack of vessel movements limited pilot trips have been undertaken. Currently
there is one authorised pilot (daytime only) and two trainee pilots. 
6.5 The harbour workboat, which is also coded for pilot boat use, is fully operational. The
vessel also recently had her annual maintenance slipping and is compliant with all current
legislation and requirements applicable to work boats and pilot boats of her class. 
6.6 Staffing, Training and Competence
An additional harbour assistant is now trained, qualified and competent to act as
coxswain for the harbour workboat in both general duties and pilotage duties.   
6.7 Staffing of the work/pilot boat remains a challenge. The forthcoming training requirement
for 26/27 includes staff training to mitigate this issue. A solution to improve the pool of
staff available is being progressed in the same way as the pilot position. This is in
accordance with the staff competency matrix which is now linked to National
Occupational Standards for the sector. 
6.8 Recruitment for MV Selkie crew to resume in Q1/Q2 of 2026/27.  A challenge remains
retaining competence and experience agency staff for the regular Selkie operational
requirements. 
7. CONSERVANCY 
7.1 Aids to Navigation 
The tables below summarise the availability of Navigational lights under Moray Council’s
responsibility.  All navigation lights across all harbours are either solar powered or run
through the street lighting systems.  There is a new sector light to be installed in Buckie to
complete the changes which will be powered by main power- cable to be installed. 
Figure 1. Availability during the last 12 months 
Page 15

Page 16

7.2 The ‘Availability Objective’ is calculated over a rolling 36 month period. This means that
over this period a Cat 1 Aid to Navigation needs to be functional for 99.8% of the time, Cat
2 Aids to Navigation 99%. 
7.3 Now that all the navigation light faults have been rectified and the new solar lights have
been installed, the required availability has now been achieved over the last 12 months,
yet it will take some time for the 36 month average target availability to be attained. 
7.4 Dredging
MV Selkie is in a very good overall operational condition. The vessel is due its second, 5
year survey. The Selkie slipped on  Thursday 26 February 2026. Out of water inspection
period by the Maritime and Coastguard Agency (MCA) surveyors took place on Monday 2
March.  Maintenance being undertaken during slipping includes; 
1. Propulsion shafts pulled and inspected 
2. Rudder and shaft clearance assessment 
3. Hull anodes replaced
4. Hold inspections
5. Hull and topside antifouled and painted 
7.5 The vessel will be refloated on or around 13 March 2026, for final in water MCA inspection
taking place 19 March. 
7.6 There have been no reposted defects with the excavator during the last quarter.  The
maintenance plan for the excavator fitted to MV Selkie was changed at the end of Q1 and
implemented for Q2 and Q3. The inspection regime has been increased to monthly and
components identified to be at risk of failure (the main cause of breakdown) are now
exchanged prior to failure, outside of the crewed the operational cycle of the vessel. 
7.7 This improves vessel availability and the cost efficiency per tonne of dredged material. The
aim is to also improve operational availability. Moray Council Fleet services currently
support the inspection, planned maintenance and repair of the excavator and has planned
dates to attend and undertake inspections until October 2026. 
7.8 Dredger working Days
Year Working
Days 
Weather
Delay Days 
Maintenance
Days 
Working
Day % 
Tonnage
Removed
25/26 YTD 70 22 43 52 11180
24/25 32 12 91 24 9012
23/24 62 58 28 42 8472
22/23 94 68 46 46 12880
21/22 77 62 59 39 14120
20/21 38 14 47 39 11240 
Following the end of the last dredger campaign, ending 16 November 2025, the temporary
crew of the Selkie were stood down for the winter period due to known weather patterns.
The dredging requirement for all harbours was kept under continuous monitoring by the
Harbour Master for any requirements.   
Page 16

Page 17

7.9 Tonnage removed per harbour during 2025/26 YTD 
Harbour  Q1 Q2 Q3
Buckie  1360 4400 1160
Burghead 400 2020 0
Findochty 0 1000 0
Portnockie 0 240 600
Hopeman 0 0 0
Cullen 0 0 0 
7.10 Dredging at Buckie is to contracted depth and regularly checked by the harbour staff.     
7.11 A dredge campaign for all harbours has been detailed by the Harbour Master to
commence once the MV Selkie has refloated and passed her final in water MCA
inspection. The current dredge programme consists of 34 days, commencing April 2026. 
7.12 At Burghead the groin is now repaired, and a bathymetric survey was conducted in June
2025. This demonstrates that the charted depth is still accurate and navigation safe in this
area. This also indicates that the current depths at Burghead are not unusual. 
7.13 The operational ambition remains to lower the depth of the approaches, then resurvey
prior to submitting the survey data and updating the charted depth. Then to maintain this
lower depth and the accessibility of the harbour at as wide a range of the tide as is
practicable. 
7.14 An application for land based dredging and beach replenishment disposal is being
progressed for Hopeman harbour. 
7.15 Dredging targets at Findochty are complete for 2025. 
7.16 Dredging targets at Portknockie are complete for 2025. 
7.17 Infrastructure
The capital plan is addressing the harbour wall infrastructure issues raised by the routine
periodic surveys. Some further items of infrastructure may need to be brought into this
routine survey programme, such as bollard surveys. This will add additional pressure to
the maintenance budget. 
7.18 The recent engineering survey at Portknockie exposed greater structural degradation of
middle pier than expected. It is intended to restrict access to berth holders only whilst
repairs are pending due to the uneven surface. 
7.19 The ends of the west and north quays at Cullen are also showing signs of structural
degradation following recent storms. Again, access may need to be restricted for safety
reasons whilst the extent of the required repairs is assessed. 
7.20 An additional survey of the north wall at Buckie is required to establish the extent of
identified movement in the structure and a repair plan. 
7.21 Environment 
Page 17

Page 18

Hundreds of tonnes of old fishing gear has been dumped on council ground at Buckie
Harbour over the last few years. The environmental impact and cleanup cost to remove
this gear and bring this land back into productive service for the harbour is significant, as
there is no recycling or scrap value in these items. A methodology to prevent further
dumping of waste fishing gear and to bring these areas back into productive use, will be
worked up for Harbour Sub Committee consideration. 
8. SUMMARY OF IMPLICATIONS 
8.1 The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  x
Policy and Legal x 
Financial x 
Risk x 
Staffing  x
Best Value and Transformation  x
Property x 
Information Communications Technology/Digital            x
Equalities. Social Inclusion and Economic Impact            x 
Climate Change and Biodiversity Impact  x 
8.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following
Council Plan strategic priorities:
☐ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report
support and contribute to improved outcomes for communities as outlined in the
following Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☐ Improving wellbeing of our population   
8.3 Policy and Legal 
The Council aims to run the harbours in compliance with the PMSC and within the
legislative framework set out for harbours. Non compliance with the code will have legal
implications.  
Page 18

Page 19

8.4 Financial 
Non compliance with the code may have financial implications. 
8.5 Risk 
Non compliance with the PMSC could result in the prosecution of the authority. 
8.6 Staffing 
There are no staffing implications arising from the report.  
8.7 Best Value and Transformation 
N/A  
8.8 Property 
No property implications arise from the report.  
8.9 Information Communications/Technology/Digital 
No ICT implications arise from the report.  
8.10 Equalities, Social Inclusion and Economic Impact 
There are no specific equalities matters, however, the Equalities Officer has been
consulted and comments incorporated into this report.  
8.11 Climate Change and Biodiversity Impacts 
There are no climate change and biodiversity implications arising from this report. 
9. CONSULTATION  
9.1 This report has been prepared in consultation with the Executive Director Economy,
Enterprise and Operations, Head of Operations and Environment, Service Manager Legal
Services, Senior Engineer (Flood Risk Management), Principal Climate Change Officer,
Equalities Officer and L Rowan, Committee Services Officer and any comments made
have been incorporated into the report 
10. BACKGROUND PAPERS  
10.1 N/A   