Harbours Sub-Committee 
Thursday, 04 December 2025 
NOTICE IS HEREBY GIVEN that a Meeting of the Harbours Sub-Committee is to be
held at Council Chambers, Council Office, High Street, Elgin, IV30 1BX on Thursday,
04 December 2025 at 09:30. 
BUSINESS 
1. Sederunt 
2. Declaration of Group Decisions and Members Interests * 
3. Minutes of meeting dated 22 October 2025 5 - 8
4. Written Questions ** 
5. Marine Safety and Operational Summary for period 2025 Q2
to 31 October
Report by Executive Director Economy Enterprise and Operations
9 - 48 
Summary of Harbour Sub Committee Functions
To fulfil the role of Duty Holder as described in the Port Marine Safety
Code, and to provide strategic oversight and direction for harbour
operations, giving greater focus and clarity on the Council’s role as
harbour authority.   
Page 1

Page 2

Watching the Meeting
You can watch the webcast live by going to: 
http://www.moray.gov.uk/moray_standard/page_43661.html    
Webcasts are available to view for 1 year following the meeting.  
You can also attend the meeting in person.  If you wish to attend
in person, please come to the High Street entrance door and a
member of staff will let you into the Chamber. 
Page 2

Page 3

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how the
individual or members of the group will vote on any item(s) of business on the
Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any relevant
and competent business within the specified remits not already on the agenda, to
the Chair provided it is received by the Proper Officer or Committee Services by
5pm three working days prior to the day of the meeting, please see Standing Order
36 for deadlines.  A copy of any written answer provided by the Chair will be
published on the Council’s committee management system by 12pm the day
before the meeting.  The Member who has put the question may, after the answer
has been published, may ask one supplementary question directly related to the
subject matter at the meeting, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the consent
of the Chair. If a Member does not have the opportunity to put a supplementary
question because no time remains, then he or she can submit it in writing to the
Proper Officer who will arrange for a written answer to be provided within 7
working days. 
Page 3

Page 4

MORAY COUNCIL 
Harbours Sub-Committee 
SEDERUNT 
Councillor Marc Macrae  (Chair)
Councillor Amber Dunbar  (Depute Chair)  
Councillor James  Allan  (Member)
Councillor Neil Cameron  (Member)
Councillor Tracy Colyer  (Member)
Councillor Sonya Warren  (Member)  
Clerk Name: Lissa Rowan
Clerk Telephone: 01343563015
Clerk Email: lissa.rowan@moray.gov.uk 
Page 4

Page 5

MORAY COUNCIL 
Minute of Meeting of the Harbours Sub-Committee 
Wednesday, 22 October 2025 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor James  Allan, Councillor Neil Cameron, Councillor Amber Dunbar,
Councillor Marc Macrae, Councillor Sonya Warren 
APOLOGIES 
Councillor Tracy Colyer 
IN ATTENDANCE 
Executive Director Economy, Enterprise, and Operations; Head of Operations and
Environment; Service Manager Harbours; and L Rowan, Committee Services Officer.  
ALSO PRESENT BY INVITATION  
Richard Vaughan, ABP Marine Environmental Research Ltd (Designated Person)   
1         Chair 
Councillor Macrae chaired the meeting. 
2         Declaration of Group Decisions and Members Interests 
In terms of Standing Orders 21 and 23 of the Councillors’ Code of Conduct, there
were no declarations from Group Leaders or Spokespersons in regard to any prior
decisions taken on how Members will vote on any item on the agenda or any
declarations of Member’s interests in respect of any item on the agenda. 
3         Written Questions 
The Committee noted that no written questions had been submitted. 
4         Marine Safety and Operational Summary for period 2024 Q4 to 2025 Q1 
The meeting had before it a report by the Executive Director Economy, Enterprise and
Operations informing the Committee on matters of Marine Safety and compliance
with the Port Marine Safety Code (PMSC) for the year 2024/25 Q4 and 2025/26 Q1.
Item 3.
Page 5

Page 6

The Chair welcomed everyone to the first meeting of the Moray Harbour Sub-
Committee and introduced Richard Vaughan from ABP Marine Environmental
Research Ltd who had been appointed as the Designated Person by the Council. 
Mr Vaughan shared a presentation detailing the findings of the audit that he had
carried out earlier in the year. In summary, the audit identified fourteen non-
compliances and fifty-one improvement opportunities under the updated Port Marine
Safety Code (PMSC). 
In general, Mr Vaughan found that Harbours within Moray are well-kept and safe with
staff showing strong local knowledge and displaying good practices including water
safety education for schoolchildren and regular user engagement meetings. This
positive observation is important context when considering the later findings of non-
compliances and improvement opportunities which are mainly procedural and not
indicative of unsafe harbour conditions. 
Non-Compliances 
The audit highlighted several areas where Moray Council's harbour operations did not
meet the updated Port Marine Safety Code which in the main were paperwork based
and could be rectified quickly. These included the absence of formal vessel traffic
risk assessments, a missing enforcement policy, and incomplete documentation of
staff responsibilities. The Marine Safety Plan was outdated and difficult to access,
and Buckie North Quayside was found to be in poor condition, resulting in a safety
risk. Additionally, competence standards and training procedures were unclear, and
the Council lacked general direction powers under current legislation. 
Observations 
Several improvement opportunities were identified during the harbour audit,
including clearer documentation, better user awareness, and more robust
operational procedures. Safety concerns were raised about paddleboarding at
Hopeman Harbour due to visibility issues. The audit also recommended clearer
procedures for issuing special vessel directions and the development of towage
guidelines and risk assessment standards. 
The Head of Operations and Environment advised that, since completing the audit,
Paul Jennings, Service Manager Harbours had been appointed and that updates to
the Harbour Safety Management System and a new Marine Safety Plan (2025-2028)
had been completed and ready for approval. She further highlighted the introduction
of duty holder training, enforcement policies, and risk assessments. 
During discussion, the Committee raised a number of points including near miss
incident reporting and the performance of the dredger. 
In response, the Head of Operations and Environment advised of improved dredging
operations and vessel reliability with more than 10,000 tonnes removed to date.
Regarding the reporting of near miss incidents, she advised that an online near miss
reporting system had been introduced so that members of the public can report near
misses at any time from their mobile devices. 
Page 6

Page 7

The Committee welcomed the report and audit findings and thereafter unanimously
agreed to: 
(i) note the findings of the PMSC audit carried out by the Designated Person
(ABPmer)  as set out in Appendix 1 Section A; 
(ii) note the safety performance as set out in the report, fulfilling their function as
Duty Holder under the Port Marine Safety Code (PMSC)  as set out in Appendix
1 Section B; 
(iii) note the actions taken against the observations in the PMSC audit report to
achieve compliance with the PMSC as set out in paragraph 4.7 and Appendix 1
section A of the report; 
(iv) approve v8 of the Marine Safety Management System, which is updated to
achieve compliance with the revised PMSC  as set out in Appendix 2 of the
report; 
(v) approve the revised Marine Safety Plan and associated KPIs for 2005-2008 as
set out in paragraph 4.8 of the report; and 
(vi) note the harbours financial position set out in paragraphs 4.9-4.15, operations
activity report set out in paragraphs 4.16-4.21, and conservancy reports set
out in Section 5 of the report. 
Page 7

Page 8

Page 8

Page 9

Report to: Harbours Sub Committee Meeting Date: 4 December 2025  
Report by: Executive Director Economy, Enterprise and Operations 
Author: Paul Jennings  Contact Email: paul.jennings@moray.gov.uk 
Subject: Marine Safety and Operational Summary for period 2025 Q2 to 31
October 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to inform the Harbour Sub Committee (HSC) on matters of
Marine Safety and compliance with the Port Marine Safety Code (PMSC) for the year
2025/26 Q2 and part of Q3 until 31 October 2025. 
1.2  This report is submitted to the Harbour Sub Committee in terms of Section III (F) (25) of the
Council's Scheme of Administration relating to the functions of Council as Statutory
Harbour Authority (SHA). 
2.  SUMMARY  
2.1  The report sets out safety and key operational indicators for the harbours, a financial
overview, reports against the Marine Safety Plan KPIs and the progress towards
compliance with the April 2025 Port Marine Safety Code (PMSC). 
2.2  It should be noted that a revised PMSC was released by the Maritime and Coastguard
Agency (MCA) in April 2025. The Moray Harbours annual PMSC audit was also conducted
in April 2025, against the updated code, by newly appointed auditors. The updated PMSC
is much more prescriptive in how harbours and facilities now “must” be managed and
operated. This change of emphasis resulted in the need to further develop and amend the
Marine Safety Management System to achieve full compliance with the code. The MCA
have announced the next PMSC Compliance Exercise will open on 1 January 2026 and
close on 31 March 2026. The ability to declare partial compliance will also be an option
during the next Compliance Exercise. 
2.3  The harbours financial position to 31 October of the financial year is presented and on
budget. The proposed Schedule of Fees and Charges for the harbours for the FY 2026/27 is
included for HSC consideration prior to it going to Council for approval. Updates with
regard to operational activity and conservancy of the harbours are also included.
Item 5.
Page 9

Page 10

2.4  It should be noted that following recent engineering surveys important remedial works
have been identified as being required at Buckie North Pier, Cullen West Pier and
Portknockie Middle Pier. 
3.  RECOMMENDATIONS 
3.1  It is recommended that the Sub Committee:   
i)  consider and note the actions taken against achieving compliance with the
PMSC (para 4.7 ); 
ii)  note the reported progress against the KPIs for the Marine Safety Plan 2025-
2028, fulfilling their function as Duty Holder under the Port Marine Safety
Code (PMSC) (para 4.8 & 4.9); 
iii)  consider and note the Schedule of Fees and Charges for the 2026/2027
financial year (para 5.7 and Appendix 1) and recommend their adoption to full
council for approval; and 
iv)  note the harbours financial position (Section 5.0), operations activity report
(Section 6.0), and conservancy reports (Section 7.0).   
Paul Jennings
Interim Service Manager Harbours 
4.  PORT MARINE SAFETY CODE AUDIT 
4.1  Under the requirements of the Port Marine Safety Code (PMSC) the Council must appoint
a Duty Holder to ensure that compliance with the PMSC is achieved.  The council must
provide a report on PMSC performance on an annual basis. 
4.2  The role of Duty Holder is held by members of this HSC.  The role provides accountability
for ensuring the organisation’s compliance with the PMSC and their organisation’s
performance in ensuring safe marine operations.  This report provides information on
which to base assessment of compliance and safe operations. It should be noted that
duty holders are required to be conversant with PMSC and its content. Duty Holders
should undergo training to discharge their duty. For those current committee members
who require training or wish refresher training, they can undertake online webinar training
hosted by the British Ports Association. Future training dates have been circulated to the
members of the HSC that have yet to conduct this training and they have booked onto the
courses. Dates of Duty Holder training are now recorded in the MSMS, along with
operational harbour visits conducted by Duty Holders. 
4.3  The Harbour Authority appoints a suitably qualified person to act as the Designated
Person (DP) – their function is to provide independent assurance that the Marine Safety
Management System is working effectively and to audit compliance with the PMSC.  The
DP role is now undertaken by ABPmer following a procurement exercise earlier this year. 
4.4  The PMSC was revised and updated on 15 April 2025. Moray Council must now
demonstrate compliance against the revised PMSC. It should be noted the updated PMSC 
Page 10

Page 11

code is much more prescriptive in how harbours and facilities now “must” or “shall” be
managed and operated, where previously it advised they “should” or “may” be operated.
This change of emphasis has caused the need for the Marine Safety Management System
to be further developed to achieve full compliance with the code. The audit report covers
179 areas, has 114 compliant areas, 51 recommendations and 14 areas of non-
compliance with the PMSC, including the need for a new Marine Safety Plan. It also
highlights two areas identified as best practice.  A declaration of compliance (or partial
compliance) with the PMSC should be lodged with the Maritime and Coastguard Agency
(MCA) between 1 January 2026 and 31 March 2026. The aim is to achieve full compliance
with the PMSC so this can be reported as such to the MCA during this period. 
4.5  Moray Council, in its capacity as a Statutory Harbour Authority, is committed to
undertaking and regulating marine operations to safeguard all its harbour areas, the users,
the public and the environment through its Marine Safety Management System (MSMS).
The new PMSC includes requirements which necessitated the latest revision to the MSMS
including a new MSP. The MSMS was updated and approved by this Sub Committee on 22
October 2025 to include these requirements (para 4 of the Minute refers). The MSMS is a
live document, which includes a Marine Safety Plan (MSP) that should be approved by the
Duty Holder and reviewed and reported against on at least an annual basis. 
4.6  There was one reported injury ashore prior to 31 October 2025. This has resulted in an
insurance claim. There were no reported near misses and no incidents afloat. The
Navigational Safety Risk Assessment for each harbour, reviewed annually or after each
reported incident, subsequently has no changes. Mechanisms to better promote incident
and near miss reporting will be sought and recommended for future implementation. 
4.7  A full annual audit of Moray Council’s compliance with the recently updated 2025 PMSC
was carried out by the newly appointed ABPmer in their capacity as the Designated
Person. This audit, which is more detailed than previous reports, was conducted 8-10 April
2025 concluding that the Moray Council harbours were not compliant with the revised
2025 Port Marine Safety Code, where it had been compliant with the previous version of
the PMSC. The Audit Report identified14 non-compliances and 51 observations where
improvement can be made out of 179 areas audited.  The majority of the non-compliances
have been rectified by redrafting the MSMS to include additional and more specific
references to the structural processes underpinning the harbours management, in
accordance with the importance and emphasis now placed with regard to such matters in
the revised PMSC.  Specific operational procedures relating to pilotage, training and
competence have also been identified as needing improvement to be compliant with the
new PMSC.  These procedures have been addressed or are currently being addressed. It is
expected the harbours operated by Moray Council will be compliant with the revised
PMSC by the time of the triennial compliance reporting exercise to the MCA, in the first
quarter of 2026. 
4.8  Summary of non-compliances raise in the April 2025 PSMC audit 
Subject Evidence required for
compliance
Recommendations Current compliance
status
Assessment
of Vessel
Traffic
Management
Has a Formal Risk
Assessment (FRA) been
conducted into the
An FRA needs to be
conducted to
determine the level
of Vessel Traffic
Risk Assessments and
Operational procedures
to be updated. 
Page 11

Page 12

using Marine
Guidance
Note (MGN)
401 (MCA,
2022)
requirement for a Vessel
Traffic Service. 
Management
required at each of
the harbour areas. 
Work commenced.
Target date: 31/12/25
Dangerous
Vessels
If the Organisation is a
Harbour Authority, are
powers to issue
Dangerous Vessels
Directions by the
Harbour Master
included in the MSMS?
A detailed
procedure should
be produced. 
Dangerous Vessel policy
and procedure to be
written and integrated
into the MSMS.
Ensure required staff
knowledge is captured on
competency records.
Staff trained and
assessed. 
Target date: 31/12/25 
Pilotage
Competent
Harbour
Authority
(CHA)
Has an FRA been
conducted into the
requirement for
Pilotage?  Is the
Organisation a CHA?
An FRA for the
requirement of
pilotage should be
conducted for all
harbours. 
FRAs to include an
assessment for all
harbours and update the
Buckie FRA to clarify the
Buckie pilotage
jurisdiction. 
Work commenced
Target date: 31/12/25 
MSMS
Accountability
Officers
Does the MSMS define
the appointment of
Officers and their
delegated powers,
duties and
responsibilities?  
Include
descriptions for
each of the roles in
the Organisation
Chart.  
MSMS updated for Duty
Holder approval. 
Complete.
Enforcement
Policy
Is there clear policy on
enforcement and
prosecution?
A policy on
enforcement must
be produced and
approved by the
Duty Holder.  
Enforcement policy
drafted and with legal
service for verification
prior to being brought to
Duty Holder for approval
and integration into the
MSMS. 
Work commenced
Target date: 31/01/26 
MSMS review Does the MSMS
incorporate a regular
and systematic review of
its performance?
The MSMS must
incorporate a
regular and
systematic review
of its performance.  
MSMS updated to include
a review policy for Duty
Holder approval. 
Complete. 
Competence
(Trained,
Qualified,
Experienced)
Are National
Occupational Standards
(NOS), or an equivalent,
NOS, or an
equivalent, should
be reviewed and
applicable
Competencies for tasks
conducted by harbours
staff created and
Page 12

Page 13

used in recruiting and
training?
elements
incorporated.
reference against NOS
where possible. 
Complete. 
Is there a methodology
for assessing personnel
against the set
standards?
To ensure that
competent persons
are employed
Moray Council
should develop an
assessment
methodology.
Competency matrix for
staff developed. 
Complete. 
Are existing staff
reviewed to ensure they
meet the standards set?
NOS or an
equivalent should
be reviewed and
applicable
elements
incorporated.
Competency matrix for
staff developed. 
Complete.
Publication of
a Marine
Safety Plan
(MSP)
Has the Organisation
published a MSP?
In order to comply
with this ‘Key
Measure’ the
Marine Safety Plan
needs to be clearly
published.
Marine Safety Plan with
KPIs submitted to Duty
Holder for approval. 
Complete.
MSP Review Is the MSP reviewed and
is this review published?
The review
requirements
around the MSP
should be captured
within the HSMS.
MSMS re-drafted to define
review procedure and
periodicity. 
Complete. 
MSP Timing Is the MSP in date and
within its three-year
period?
The outdated MSP,
should be reviewed
and a new plan
published.
MSP submitted for Duty
Holder approval. 
Complete. 
Conservancy
Introduction
Are the marine facilities
in good repair and fit for
purpose?
The Council should
consider its
responsibility under
The Workplace
(Health, Safety and
Welfare)
Regulations 1992.
There is an inspection
plan for harbour facilities
and structures against the
asset register. It is current
practice to log defects
and prioritise repairs.
Need to consider closing
unsafe areas until
repaired. 
Complete. 
Harbour
Authority
Conservancy
Duty
Buckie North Quay
surface condition
severely deteriorated.
Poses risk to staff
and users
accessing that part
of the harbour.
Priority 1 repair
requested. Area requires
closed to pedestrians and
vehicles. 
Page 13

Page 14

Risk to be managed
compliantly pending full
repair. 
Harbour
Authority
Conservancy
Duty
Is there a Harbour
Authority' recognition of
the ‘duty to conserve’
and/or ‘reasonable care’
statement?
Add a statement
regarding the
Council’s legal
duties to the HSMS.
Statement added to
MSMS revision. 
Complete. 
4.9  The Marine Safety Plan 
Following approval of the Marine Safety Plan by this Sub-Committee on 22 October 2025,
the agreed KPIs for the 2025-2028 period are shown in the table below with the latest
results. The plan is based upon marine safety management requirements, conservancy
requirements, compliance requirements, the financial situation, growth potential,
harbours user and community consultation. 
Moray Harbours MSP 2025-2028 
1. Full compliance with the
Port Marine Safety Code.
KPI indicator: No non compliances
reported against the PMSC
audit. 
Update Nov 2025 4 Non-compliance actions
outstanding
2. Incident reporting
improved.
KPI indicator: Improved near miss
reporting methodologies
with better public access to
reporting systems. 
Update Nov 2025 Public and staff online
reporting system in design
stage.  
Incidents investigated within
2 weeks of the date
reported. 
Update Nov 2025 All incidents investigated
within time limit
3. Harbour infrastructure
maintained to ensure all
commercial contracts can
be fulfilled.
KPI indicator: No reported delays to
commercial contracts due to
infrastructure issues. 
Update Nov 2025 All contracts running
smoothly  
AtoN availability in
accordance with NLB
reporting requirements 
Update Nov 2025 AtoN availability is currently
100% but will take 36
months to achieve full NLB
compliance.  
Commercial quayside
lighting at 100% availability 
Update Nov 2025 At 100% for the quarter 
Page 14

Page 15

Pilot boat availability at
95%. 
Update Nov 2025 At 100% for quarter  
Commercial quays and
approaches dredged to
declared depths for
commercial customers. 
Update Nov 2025 At 100% for the quarter
4. Harbour staff competent
in their core roles.
KPI indicator: Competence matrix
measured at competent or
awaiting assessment, for all
staff with more than six
months service. 
Update Nov 2025 At 100% for the quarter  
All Duty Holders completed
training within 6 months of
appointment 
Update Nov 2025 5/6 Duty Holders trained
5. Traffic management
reviews conducted for all
harbours, to minimise risk
between all types of harbour
user. 
KPI indicator: Traffic management
reviewed by March 2027. 
Update Nov 2025 Buckie TMP to be
completed by end of
FY25/26 Q4  
Actions from traffic
management plans in place
by March 2028. 
Update Nov 2025 In progress
6. Harbours Website
updated.
KPI indicator: New website to include all
relevant compliance,
navigational and
conservancy information,
including the MSP and
reported progress against
the plan. 
Update Nov 2025 Collating data ready for
website update
7. Leisure berth occupancy
maximised 
No unsold leisure berths 
Update Nov 2025 Zero unsold berths  
Waiting lists numbers above
zero for all harbours 
Update Nov 2025 All waiting lists have above
20 names
8. Harbour quayside space
used to maximise, safety,
community benefit and
income at all harbours. 
One improvement or service
provided following
suggestions by the relevant
Harbour User Groups,
implemented at, Burghead,
Hopeman, Findochty,
Portknockie and Cullen
Harbours by March 2027.
Page 15

Page 16

Update Nov 2025 Alternative storage sites
being sought to free up
quayside space for initiative
options 
5. FINANCIAL REPORT 
5.1 Financial report
A summary of the financial position of the harbours revenue and capital plans is included
below. This years’ capital figures are broken down by task. 
5.2 Harbours Revenue Income and Expenditure
All Harbours revenue figures to the end of October 2025. 
Annual Budget Budget to 31/10 Actual at 31/10 
Income  (£1,192,696)  (£777,326)  (£769,885)
Expenditure  £945,611  £462,828  £546,159
Net   (£247,085)  (£314,498)  (£223,726) 
5.3 Revenue income up to 31 October 2025 includes most income expected from the leisure
harbours. The commercial harbour income will continue to be received as invoices are
paid for services offered throughout the year. Income is as forecast. Expenditure is slightly
ahead of forecast. This is mostly due to increased staff costs for absence cover,
associated costs to comply with the new work boat code and legal fees. 
5.4 Cargo income to date is slightly lower (approx. 7%) than forecast due a reduced demand
for malt cargo imports in comparison to previous years. 
5.5 Harbours capital expenditure plan for 2025/26
2025/26 Planned Capital expenditure is £698,000 
Project  Approved Budget  Spend to date  Notes 
Buckie navigation
light 
£125,000  £109,450  Works completed.
Risks that were
allocated budget
were not realised. 
Buckie weighbridge   £22,000  £22,000  Works complete.
Weighbridge
operational. 
Buckie Pier 1 joints  £124,000  £10,000  Design agreed.
Tenders received and
work appointed. Full
amount will be spent.
Burghead sheet pile
repairs 
£245,000  £218,310  Work complete. 
Portknockie north
wall repairs 
£114,000  £95,720  Work complete 
Page 16

Page 17

Portknockie middle
pier repair design 
£35,000  £24,773  Survey and design
report received.
Further survey and
design work
required. 
Portknockie pontoon
replacement design
work.
£33,000  £0   Design works to be
initiated Q4.
Cullen West Pier
survey and repair
design
£49,000 £0 Initial survey works
complete. This has
identified further
survey work is
required. 
Total  £747,000  £480,253   
5.6 Capital expenditure is aligned with the identified engineering projects which are
scheduled following routine inspection and condition reports. The completed works
include the replacement Buckie navigation light, an extension to the Buckie weighbridge
platform, the Portknockie north wall repairs and the Burghead inner quay sheet piling
repairs. The Buckie pier one repairs have been appointed to a contractor and are planned
to commence in November. An engineering report to establish the condition of the
Portknockie middle pier identified extensive further works are required. This will delay the
new pontoon installation but not the design work. A new survey of Cullen west pier and the
north pier, commissioned after new movement was observed in the structures following
the last storm, has identified that significant additional structural repairs are required. The
feasibility works have been added to the capital works plan. 
5.7 A review of the Schedule of Fees and Charges has been undertaken and is included at
Appendix 1. The list is updated as part of the annual review of fees and charges and also
maximise potential income against market standards. In general, a 5% uplift is proposed
to cover inflation. The list also includes all the necessary additional charges for expected
activity in the 2026/27 financial year. The HSC will be asked to note the updated Schedule
of Fees and Charges from a Duty Holder perspective, prior to Schedule of Fees and
Charges being submitting to Council for final budgetary approval for financial year
2026/27. 
6. OPERATIONAL REPORT 
6.1 Operational Report 
Incidents Reported 
Page 17

Page 18

2024/25 Injuries Incidents Near Misses
Q1 0 2 0
Q2 1 0 0
Q3 0 1 0
Q4 0 0 0
Total 1 3 0
2025/26   
Q1 0 0 0
Q2/3 to 31 Oct 1 0 0
6.2 Incident reporting and near miss reporting remains low. The was one injury reported, a
member of the public falling off their bicycle at a harbour. Initiatives to increase the level of
near miss reporting, as well as the reporting of incidents, will be sought, advertised to
users and implemented. The Marine Safety Plan includes and monitors this initiative,
reporting accordingly. 
6.3 Pilotage
Pilotage is not compulsory at Buckie harbour, and therefore not all cargo movements
require the services of a pilot. The number of pilotage acts carried out in the last 6 months
is: 
Period Vessel movements Piloted vessel movements   
FY 25/26 Q1 24 12
FY 25/26 Q2 24 17
FY 25/26 Q3 (to 31 Oct) 6 2 
6.4 In order to increase resilience in pilotage the harbour management team is seeking to
expand the relief pool of available qualified pilots. The position is currently being
advertised. 
6.5 The harbour workboat, which is also coded for pilot boat use, is fully operational.
The vessel has recently had an unannounced MCA inspection and her annual MCA survey,
both of which she passed. The vessel also recently had her annual maintenance slipping
and is compliant with all current legislation and requirements applicable to work boats
and pilot boats of her class. 
6.6 Staffing, Training and Competence
An additional harbour assistant is now trained, qualified and competent to act as
coxswain for the harbour workboat in both general duties and pilotage duties.
Staffing of the workboat remains very tight. A solution to improve the pool of staff available
is being progressed in the same way as the pilot position, with the position currently
advertised. This is in accordance with the staff competency matrix which is now linked to
National Occupational Standards for the sector. 
7. CONSERVANCY 
7.1 Aids to Navigation 
Page 18

Page 19

The tables below summarise the availability of Navigational lights under Moray Council’s
responsibility. 
Figure 1. Availability during the last twelve months 
7.2 
Figure 2. Availability during the last 36 months. 
7.3 The ‘Availability Objective’ is calculated over a rolling 36 month period. Now that all the
navigation light faults have been rectified and the new solar lights have been installed, the
required availability has now been achieved over the last 12 months, yet it will take some
time for the 36 month average target availability to be attained. 
7.4 Dredging
MV Selkie is in a very good overall operational condition. The vessel is due its second, 5
year survey, between 12 January 2026 and 12 April 2026. This will involve a slipping and
inspection period by the Maritime and Coastguard Agency surveyors. The inspection and
the associated slipping has been book at the shipyard for March 2026. 
7.5 The maintenance plan for the excavator fitted to MV Selkie was changed at the end of Q1
and implemented for Q2 of this year. The inspection regime has been increased to monthly
and components identified to be at risk of failure (the main cause of breakdown) are now
exchanged prior to failure, outside of the crewed the operational cycle of the vessel. This
improves vessel availability and the cost efficiency per tonne of dredged material. The aim
is to also improve operational availability. Moray Council Fleet services currently support
the inspection, planned maintenance and repair of the excavator. 
7.6 To date this maintenance plan is showing signs of significant improvement for the
excavator availability compared to the previous two years where a ‘fix when a component
fails’ maintenance programme was in place. This is largely thanks to both Fleet Service
department staff and vessel staff who fully support this methodology. The table below 
Page 19

Page 20

shows the difference of the vessels availability whilst being maintained under the two
maintenance regimes. 
N.B. There was a significant component failure in Q1.
The excavator is nearing its end of life and does require replaced. This remains a risk factor
to operational availability despite the new maintenance plan. 
FY 25/26 Working Days Weather Delay
Days
Maintenance
Days
Working Day %     
Q1 14 6 38 24
Q2 40 11 3 74
Q3 (to 31 Oct) 12 4 0 75
7.7  Year Working
Days
Weather
Delay Days
Maintenance
Days
Working Day
%
Tonnage
Removed      
2025/26 YTD 66 21 41 52 11260
2024/25 32 12 91 24 9,012
2023/24 62 58 28 42 8,472
2022/23 94 68 46 46 12,880
2021/22 77 62 59 39 14,120
2020/21 38 14 47 39 11,240 
7.8 Tonnage removed per harbour during 2024/25 
Harbour Tonnage removed
Buckie 9012 
7.9 Tonnage removed per harbour during 2025/26 Q1 & Q2 
Harbour Q1 Q2  Q3 (to 31 Oct)
Buckie 1,360 4,440 1200
Burghead 400 2,020 0
Findochty 0 1,000 0
Portknockie 0 240 600 
7.10 Dredging at Buckie is to the contracted depth.  
7.11 At Burghead the groin is now repaired, and a bathymetric survey was conducted in June
2025. This demonstrates that the charted depth is still accurate and navigation safe in this
area. This also indicates that the current depths at Burghead are not unusual. 
7.12 There was good dredging progress at Burghead through the good weather of the summer
months. If there is a desire to achieve access through the majority of the tidal range then
extensive additional dredging will be required. There has been a considerable build-up of
sand in the approaches due to a lack of dredging in 2024 and the previous failure of the
groin to the south of the approaches, which was designed to slow the movement of sand. 
Page 20

Page 21

7.13 The operational ambition is to lower the depth of the approaches, then resurvey prior to
submitting the survey data and updating the charted depth. Then maintain this lower
depth and the accessibility of the harbour at as wide a range of the tide as is practicable. 
7.14 Dredging targets at Findochty are complete for 2025. 
7.15 Dredging targets at Portknockie are complete for 2025. 
7.16 Infrastructure
The capital plan is addressing the harbour wall infrastructure issues raised by the routine
periodic surveys. Some further items of infrastructure may need to be brought into this
routine survey programme, such as bollard surveys. This will add additional pressure to
the maintenance budget. 
7.17 The recent engineering survey at Portknockie exposed greater structural degradation of
middle pier than expected. It is intended to restricted access to berth holders only whilst
repairs are pending due to the uneven surface. 
7.18 The ends of the west and north quays at Cullen are also showing signs of structural
degradation following recent storms. Again, access may need to be restricted for safety
reasons whilst the extent of the required repairs is assessed. 
7.19 An additional survey of the north wall at Buckie is required to establish the extent of
identified movement in the structure and a repair plan. 
7.20 Environment
Hundreds of tonnes of old fishing gear has been dumped on council ground at Buckie
Harbour over the last few years. The environmental impact and cleanup cost to remove
this gear and bring this land back into productive service for the harbour is significant, as
there is no recycling or scrap value in these items. A methodology to prevent further
dumping of waste fishing gear and to bring these areas back into productive use, is being
worked up for Harbour Sub Committee consideration. 
8. SUMMARY OF IMPLICATIONS 
8.1 The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  x
Policy and Legal x 
Financial x 
Risk x 
Staffing  x
Best Value and Transformation  x
Property x 
Information Communications Technology/Digital            x
Page 21

Page 22

Equalities. Social Inclusion and Economic Impact            x 
Climate Change and Biodiversity Impact  x 
8.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following
Council Plan strategic priorities:
☐ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report
support and contribute to improved outcomes for communities as outlined in the
following Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☐ Improving wellbeing of our population   
8.3 Policy and Legal 
The Council aims to run the harbours in compliance with the PMSC and within the
legislative framework set out for harbours. Non compliance with the code will have legal
implications.  
8.4 Financial 
Non compliance with the code may have financial implications. 
8.5 Risk 
Non compliance with the PMSC could result in the prosecution of the authority. 
8.6 Staffing 
There are no staffing implications arising from the report.  
8.7 Best Value and Transformation 
N/A  
8.8 Property 
No property implications arise from the report.  
8.9 Information Communications/Technology/Digital 
No ICT implications arise from the report.  
8.10 Equalities, Social Inclusion and Economic Impact 
There are no specific equalities matters, however, the Equalities Officer has been
consulted and comments incorporated into this report.  
8.11 Climate Change and Biodiversity Impacts
Page 22

Page 23

There are no climate change and biodiversity implications arising from this report. 
9. CONSULTATION  
9.1 This report has been prepared in consultation with the Executive Director Economy,
Enterprise and Operations, Head of Operations and Environment, Service Manager, Legal
Services, Service Manager, People Management, Senior Engineer (Flood Risk
Management), Principal Climate Change Officer, Equalities Officer and L Rowan,
Committee Services Officer and any comments made have been incorporated into the
report 
10. BACKGROUND PAPERS  
10.1 N/A   
Page 23

Page 24

APPENDIX 1
Proposed Moray Council Harbours Schedule of Fees and Charges 2026/2027
SECTION I: HARBOURS 
REF SERVICE CHARGE
2024/25
CHARGE
2025/26
DATE OF LAST
CHANGE
CHARGE
2026/27 
Commercial harbours
Leisure harbours
All charges are net of VAT unless
indicated 
Proposed uplift
of 5% to most
charges
I1 Cargo Vessels    
I1a Cargo Vessel – per 7 days or
part thereof (per dead weight all
told ton (where GT exceeds
DWAT, payment will be based
on GT) 
£0.61 £0.63 April 2025  £0.66
I1b Cruise ships – per 7 days or part
thereof (per dead weight all told
ton – where GT exceeds DWAT)
£0.50 £0.50 April 2024  £0.53
I1c Self Propelled and towed barges
per 7 days or part thereof (per
m2 or part thereof)
£1.18 £1.22 April 2025 £1.28
Page 24

Page 25

REF SERVICE CHARGE
2024/25
CHARGE
2025/26
DATE OF LAST
CHANGE
CHARGE
2026/27 
I1c
(i)
All CTV per day (per length, per
metre or part thereof) 
All CTV per month (per length,
per metre or part thereof) non
refundable  
All CTV per annum (per length,
per metre or part thereof) non
refundable 
£4 
£81 
£851
£4 
£84 
£882
April 2025  £4.35 
£88.11 
£926.10
I1d Tugs and maintenance/service
vessels – per 7 days or part
thereof per m or part thereof
£6
Minimum charge
£85
£6
Minimum charge
£88
April 2025  £6.30 
£92.40
l1f Compulsory International Port
Waste Fee (General waste only,
on arrival per visit) All other
waste by special arrangement.
£85 £88 April 2025  £92.40
Page 25

Page 26

REF SERVICE CHARGE
2024/25
CHARGE
2025/26
DATE OF LAST
CHANGE
CHARGE
2026/27
l1g Storage of cargo equipment on
piers and quaysides per 7 days
of part thereof (per m² or part
thereof) 
£6 £6 April 2024  £6.30
l1h Handling mooring ropes (per
hour or part thereof per person)
during normal working hours
(08:00 – 18:00) 
Handling mooring ropes (per
hour or part thereof per person –
out with normal working hours
18:00 - 08:00) 
£59 
£106
£61 
£110
April 2025  £64 
£115.50 
I1i Passengers embarking and
disembarking per trip including
pleasure vessels, sea angling
and cruise passengers.
Excludes passengers on pilot
boat and vessels being charged
as CTV – per passenger.
£1.25 £1.30 April 2025 £1.30 
Page 26

Page 27

REF SERVICE CHARGE
2024/25
CHARGE
2025/26
DATE OF LAST
CHANGE
CHARGE
2026/27 
I1j Cleaning of piers following
cargo movement – per hour or
part thereof 
£260.14 £270  April 2025 £283.50 
I1k Fast Rescue Craft – per
entry/departure 
£58.30 £60 April 2025 £63
I1l Cleaning of Piers when waste
left by any vessel (excluding
cargo vessels) 
£53 £55 April 2025  £57.75
I1m Annual compound charge for
chartered vessels (including sea
angling, wildlife, tourism –
charge inclusive of general
waste, waste oil and oily waste
and passenger fees.
Up to 10m – per annum
10m to 15m – per annum 
£1,057
£1,586 
£1,095
£1,643 
April 2025
April 2025 
£1149.50
£1,725.15
Page 27

Page 28

REF SERVICE CHARGE
2024/25
CHARGE
2025/26
DATE OF LAST
CHANGE
CHARGE
2026/27
Over 15m – per annum £2,114 £2,190  April 2025 £2,299.50 
I1n Supply of ice:
Per tonne 
Per standard fish box 
£73 
£3 
April 2024 
April 2023 
£76.65 
£3.15
I1o ISPS admin fee (for all ISPS
registered vessels. Per visit.) 
New Charge £80
I2 Fishing Vessels   
I2a Composition Fee (entries to
qualify for quarterly
composition fee = 3 entries in 1st
month)  
April 2025 
Vessels:     
Under 10m £41.34 £42.83  £44.97 
10-17m £62.20 £64.44  £67.66 
17-22m £92.34 £95.66  £100.44
Page 28

Page 29

REF SERVICE CHARGE
2024/25
CHARGE
2025/26
DATE OF LAST
CHANGE
CHARGE
2026/27 
22-26m £113.04 £117.11  £122.97 
26-30m £131.90 £136.65  £143.48 
Over 30m  £214.76 £222.49  £233.61
I2b Single Entry (per 7 days or part
thereof – including vessels laid
up)     
Vessels:     
Under 10m £41.34 £42.83  £44.97 
10-17m £62.20 £64.44  £67.66 
17-22m £92.34 £95.66  £100.44 
22-26m £113.04 £117.11  £122.97 
26-30m £131.90 £136.65  £143.48 
Over 30m £214.76 £222.49  £233.61
I2e Surcharge after a continuous
period of 12 weeks 
50% on top of
charges above 
50% on top of
charges above 
April 2006 
Page 29

Page 30

REF SERVICE CHARGE
2024/25
CHARGE
2025/26
DATE OF LAST
CHANGE
CHARGE
2026/27
l2f Compulsory domestic vessel
waste charge (on arrival, per
visit, includes general waste,
waste oil and oily waste)
Up to 10m
Over 10m
This charge will be levied on only one
occasion per vessel per week 
£11
£22 
£11
£23 
April 2021
April 2021 
£11.55
£24.15
l2g Storage of Fishing equipment in
net storage area (per m² per month or
part thereof)
£2 £2.07  April 2020  £6.30
I2h Vessels less than or equal to
10m in length engaged in
licensed creel fishing 
Where non declaration of fish
landings per quarter, per vessel 
Recreational dues
plus 2% of catch
value 
£444 
Recreational
dues plus 2% of
catch value 
£458 
April 2012 
April 2024 
Recreational
dues plus 2% of
catch value 
£480.90 
Page 30

Page 31

REF SERVICE CHARGE
2024/25
CHARGE
2025/26
DATE OF LAST
CHANGE
CHARGE
2026/27
I3 Recreational Vessels    
Page 31

Page 32

I3a Pontoon Berth - Annual
berthing charges (inc VAT)
Over 3 - 4m
Over 4 - 5m
Over 5 – 6m
Over 6 – 7m
Over 7 – 8m
Over 8 – 9m
Over 9 – 10m
Over 10 – 11m
Over 11 – 12m
Over 12 – 13m
Over 13 – 14m
Over 14 – 15m
Over 15 – 16m
Over 16 – 17m
Over 17 – 18m
Over 18 – 19m
Over 19 – 20m 
£388
£485
£582
£679
£776
£873
£970
£1,067
£1,164
£1,261
£1,358
£1,455
£1,552
£1,649
£1,746
£1,843
£1,940 
£407.40
£509.25
£611.10
£712.95
£814.80
£916.65
£1,018.50
£1,120.35
£1,222.20
£1,324.05
£1,425.90
£1,527.75
£1,629.60
£1,731.45
£1,833.30
£1,935.15
£2,037.00
April 2025  
£427.80
£534.70
£641.65
£748.60
£814.80
£916.65
£1,069.40
£1,176.35
£1,283.30
£1,390.25
£1,497.20
£1,604.15
£1,711.10
£1,818.00
£1,924.95
£2031.90
£2138.85
Page 32

Page 33

REF SERVICE CHARGE
2024/25
CHARGE
2025/26
DATE OF LAST
CHANGE
CHARGE
2026/27
Each metre thereafter £97 £101.85  £106.95 
Page 33

Page 34

Wall/Loose Mooring - Annual
berthing charges (inc VAT)
Over 3 - 4m
Over 4 - 5m
Over 5 – 6m
Over 6 – 7m
Over 7 – 8m
Over 8 – 9m
Over 9 – 10m
Over 10 – 11m
Over 11 – 12m
Over 12 – 13m
Over 13 – 14m
Over 14 – 15m
Over 15 – 16m
Over 16 – 17m
Over 17 – 18m
Over 18 – 19m
Over 19 – 20m 
£324
£405
£486
£567
£648
£729
£810
£891
£972
£1,053
£1,134
£1,215
£1,296
£1,377
£1,458
£1,539
£1,620 
£340.20
£425.25
£510.30
£595.35
£680.40
£765.45
£850.50
£935.55
£1,020.60
£1,105.65
£1,190.70
£1,275.75
£1,360.80
£1,445.85
£1,530.90
£1,615.95
£1,701.00
April 2025  
£357.20
£446.50
£535.80
£625.10
£714.40
£803.70
£893.00
£982.30
£1,071.65
£1,160.95
£1,250.25
£1,339.55
£1,428.85
£1,518.15
£1,607.45
£1,696.75
£1,786.05
Page 34

Page 35

REF SERVICE CHARGE
2024/25
CHARGE
2025/26
DATE OF LAST
CHANGE
CHARGE
2026/27
Each metre thereafter  £81 £85.05 £89.30
Page 35

Page 36

Hardstanding - Annual berthing
charges (inc VAT)
Over 3 - 4m
Over 4 - 5m
Over 5 – 6m
Over 6 – 7m
Over 7 – 8m
Over 8 – 9m
Over 9 – 10m
Over 10 – 11m
Over 11 – 12m
Over 12 – 13m
Over 13 – 14m
Over 14 – 15m
Over 15 – 16m
Over 16 – 17m
Over 17 – 18m
Over 18 – 19m
Over 19 – 20m 
£260
£325
£390
£455
£520
£585
£650
£715
£780
£845
£910
£975
£1,040
£1,105
£1,170
£1,235
£1,300 
£273.00
£341.25
£409.50
£477.75
£546.00
£614.25
£682.50
£750.75
£819.00
£887.25
£955.50
£1,023.75
£1,092.00
£1,160.25
£1,228.50
£1,296.75
£1,365.00
April 2024
5% increase
agreed with
HACS  £286.65
£358.30
£430.00
£501.65
£573.30
£645.00
£716.65
£788.30
£860.00
£931.60
£1,003.30
£1,074.95
£1,146.60
£1,218.25
£1,289.95
£1,361.60
£1,433.25
Page 36

Page 37

REF SERVICE CHARGE
2024/25
CHARGE
2025/26
DATE OF LAST
CHANGE
CHARGE
2026/27
Each metre thereafter  £65  £68.25  £71.65
I3c Discounted rate for pensioners
(boats less than 7m in length)
(for current beneficiaries only,
defined as; must be an over 65
berth holder in 2016 and held
berth since 2016)
75% of current
relevant charge
75% of current
relevant charge
April 2016 75% of current
relevant charge
I3d Trailers and vessel moving
equipment –
intended to be left on harbour property
for storage (outwith period of
launch/recovery of vessels) 
per annum
£200.00 208.00 April 2025  218.40
I3e Rover Ticket - in line with
Aberdeenshire Council 
£75 + VAT  £ 90
+ VAT 
April 2025  £ 90
+ VAT
Page 37

Page 38

REF SERVICE CHARGE
2024/25
CHARGE
2025/26
DATE OF LAST
CHANGE
CHARGE
2026/27
I3f Visiting Vessel Day Ticket per
day or part thereof 
£20.83 + VAT £21.67 + VAT  April 2025 £22.75 + VAT 
I4 Harbour Dues    
I4e Use of port/harbour to
demonstrate or test equipment/
vessel or any other similar event
(commercial) - per day or part
thereof
£271.69  £281 April 2025  £295
I4f Use of port/harbour for
community/ charity events 
£113.20 £117  April 2025 £122.85 
I4g Use of harbour for paddle
sports etc 
By individual
agreement
By individual
agreement
April 2019 POA
I4h Hire of Single Gangway £40  £41  April 2024  £43 
Page 38

Page 39

REF SERVICE CHARGE
2024/25
CHARGE
2025/26
DATE OF LAST
CHANGE
CHARGE
2026/27
I4i Hire of Forklift and operator (on
application -subject to availability) 
£70.00 ph
Minimum 2
hours
New Charge
2025
£73.50
I4j Attendance of harbour staff
outside of normal working hours
and/or public holidays 
Full cost
recovery
New Charge
2025
Full cost
recovery
I5 Wharfage   
I5a Minimum charge – all categories
per tonne (change in pricing
arrangement) 
£237.73 £246.29  April 2025 £258.60 
I5b Basic materials, manufactured
goods, fuels (other than
petroleum spirit) per tonne 
£1.28 £1.33  April 2025  £1.40 
Page 39

Page 40

REF SERVICE CHARGE
2024/25
CHARGE
2025/26
DATE OF LAST
CHANGE
CHARGE
2026/27
I5c Wet fish, including fish
consigned to or from any
harbour not owned by Moray
Council 
Wet fish “That part of landings
of white fish and shellfish in
excess of £7,500 in value”
2.5%
Ad valorem 
1.5%
Ad valorem
2.5%
Ad valorem 
1.5%
Ad valorem 
April 2008 
April 2008
2.5%
Ad valorem 
1.5%
Ad valorem 
I5d Wood, Lumber, Cork,
Chipboard and Blockboard per
cubic metre
£1.11  £1.15 April 2025 £1.21
I5f Foods (other than wet fish) per
tonne 
£1.28  £1.33 April 2025 £1.40
I5g Fabricated Goods per tonne  £8.45 £8.75 April 2025 £9.20
I5h “Loyalty” Reduction in Charges
Above 25,000 tonnes  Scale rate less 5%
Price on
application  April 2006
Price on
application
Page 40

Page 41

REF SERVICE CHARGE
2024/25
CHARGE
2025/26
DATE OF LAST
CHANGE
CHARGE
2026/27
l5j Dangerous Goods (any
hazardous chemicals –
explosives or inflammables) per
tonne 
£90 £93 April 2025  £97.65
I5k Heavy lifting for extraordinary
specialised activities, eg
transformers, wind turbine parts
50-99 tonnes – per tonne
100-149 tonnes – per tonne
150-249 tonnes – per tonne
Over 250 tonnes – per tonne 
£1.77
£2.21
£2.66
£3.10 
£1.83
£2.29
£2.76
£3.21 
April 2025  
£1.92
£2.40
£2.90
£3.37 
I6 Slipway and repair pads    
I6a Any recreational vessel using a
slipway inclusive of one entry
and one exit from the harbour
per occasion 
£20.83 + VAT  £21.58 + VAT  April 2025  £22.66 + VAT 
Page 41

Page 42

REF SERVICE CHARGE
2024/25
CHARGE
2025/26
DATE OF LAST
CHANGE
CHARGE
2026/27
Any commercial vessel using a
slipway inclusive of one entry
and one exit from the harbour
per occasion 
Season ticket for recreational
unlimited use of any Council
slipway, valid for 12 months,
commencing 1 April per vessel 
Season ticket for commercial
unlimited use of any Council
slipway, valid for 12 months,
commencing 1 April per vessel 
£26.67 + VAT 
£65 + VAT 
£499.17 + VAT 
£27.63 + VAT 
£67.34 + VAT 
£517.14 + VAT 
April 2024 
April 2024 
April 2024 
£29.00 + VAT 
£70.71 + VAT 
£543.03 + VAT 
Page 42

Page 43

REF SERVICE CHARGE
2024/25
CHARGE
2025/26
DATE OF LAST
CHANGE
CHARGE
2026/27
I7 Weighbridges 
Goods shipped or unshipped on
which harbour dues are payable
per tonne (to nearest tonne) 
Other goods per weighing 
£0.39 
£13.33 + VAT 
£0.40 
£13.81 + VAT 
April 2025 
April 2025 
£0.42 
£14.50 + VAT
I8 Pilotage    
I8a Per gross registered ton 
Minimum charge 
£0.45 
£270
£0.47 
£280
April 2025 
April 2025 
£0.49 
£295
I8b Detention Charge for Late
arrival of vessel - per hour or
part thereof  £270  £280  April 2025  £295
Page 43

Page 44

REF SERVICE CHARGE
2024/25
CHARGE
2025/26
DATE OF LAST
CHANGE
CHARGE
2026/27
I8c Hire of Pilot-Boat and crew per
hour or part thereof including
towing support activity and
similar
Per passenger or crew member 
£270  £280  April 2025  £295
I8d Pilot Boat Maintenance Charge
“per dead weight all told ton” (to
be applied when pilotage not
requested)
(where GT exceeds DWAT,
payment will be based on GT) 
£0.17 £0.18  April 2025 £0.19 
I9 Supply of Water    
Page 44

Page 45

REF SERVICE CHARGE
2024/25
CHARGE
2025/26
DATE OF LAST
CHANGE
CHARGE
2026/27
I9a Cargo vessels:
Minimum Charge
Charge per tonne or part thereof 
£11
£5.30 
£11
£5.49 
April 2021
April 2025 
£12
£5.76 
I9b Fishing Vessels regardless of
whether a composition fee has
been paid
Up to 10m
10-20m
Over 20m
On each occasion 
£6
£12
£18 
£6
£12
£19 
April 2021
April 2021
April 2025 
£6.30
£12.60
£20.00 
I9c Recreation vessels on each
occasion 
£6 £6  April 2021  £6.30 
Page 45

Page 46

REF SERVICE CHARGE
2024/25
CHARGE
2025/26
DATE OF LAST
CHANGE
CHARGE
2026/27
I10 Supply of electricity - cost per
electrical unit
Up to 3 hours
Per Electrical unit 
£12 + VAT
£0.35 + VAT 
£12.43 + VAT
£0.36 + VAT 
April 2025
April 2025 
£13.05 + VAT
£0.38 + VAT 
I12 Fuel transfer - cost per tonne  £3 £3  April 2021  £3.15 
I13 Ground rent for container/fuel
tank (per sq m per annum (pro
rata)) 
£17 £18  April 2025  £18.90 
Page 46

Page 47

REF SERVICE CHARGE
2024/25
CHARGE
2025/26
DATE OF LAST
CHANGE
CHARGE
2026/27
I14 Hire of Room at Harbour
Office
Standard per hour or part
thereof
Junior/over 60/charity per hour
or part thereof
Business Rate per hour or part
thereof 
£27.50 
£21 
£38 
£28 
£22 
£39
April 2025  
£29.4 
£23.10 
£40.95 
Page 47

Page 48

Page 48