Democracy Spraffa

Supplementary Agenda Document Pack - Economic Development and Infrastructure Services Committee - 06/09/2022

Moray Council · 6 September 2022
Back to Economic Development and Infrastructure Services Committee — 6 September 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Economic Development and Infrastructure Services
Committee 
Tuesday, 06 September 2022 
SUPPLEMENTARY AGENDA 
The undernoted reports have been added to the Agenda for the meeting of the
Economic Development and Infrastructure Services Committee to be held at
Council Chambers, Council Office, High Street, Elgin, IV30 1BX on Tuesday, 06
September 2022 at 09:30. 
BUSINESS 
7a) Proposed Revision of Bus Fare Structure
Report by Depute Chief Executive (Economy, Environment and
Finance)  
3 - 10
7b) Moray Pathways Local Employability Partnership
Delivery Plan
Report by Depute Chief Executive (Economy, Environment and
Finance)  
11 - 42
7c) Moray Hydrogen Strategy
Report by Depute Chief Executive (Economy, Environment and
Finance)  
43 -
130
7d) Local Heat And Energy Efficiency Strategy
Report by Depute Chief Executive (Economy, Environment and
Finance)  
131 -
136
Page 1

Page 2

7e) Depot and Store Review
Report by Depute Chief Executive (Economy, Environment and
Finance)  
137 -
142 
Page 2

Page 3

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 6 SEPTEMBER 2022 
SUBJECT: PROPOSED REVISION OF BUS FARE STRUCTURE 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE 
1. REASON FOR REPORT 
1.1 To ask Committee to consider the proposal to both simplify and harmonise the
current supported bus service fares through the introduction of a zonal fare
structure and to grant delegated authority in setting additional fares and
promotions to meet market demand. 
1.2 This report is submitted to Committee in terms of Section III (F) (18) of the
Council's Scheme of Administration relating to the Council’s function in
providing public transport through the Council’s own bus route network. 
2. RECOMMENDATION 
2.1 It is recommended that Committee: 
(i) approve the proposal to simplify and harmonise bus fare options
through a zonal system on demand responsive and local bus
services; 
(ii) award the Head of Environmental and Commercial Services 
delegated authority to enact new ticket types as set out in
paragraph 4.6 of the report; and 
(iii)  award the Head of Environmental and Commercial Services, in
consultation with the Head of Financial Services delegated
authority to consider short term fares offers and promotions as
appropriate. 
3. BACKGROUND 
3.1 The Council currently provides in house operation of both demand responsive
transport/dial a bus (DRT) and a small number of supported rural bus
services. The current fleet size and profile is determined by Council
requirements in providing home to school transport and adult social care
Item 7a)
Page 3

Page 4

contracts. The opportunity has been taken to utilise the off peak downtime of
these vehicles to provide DRT across Moray, covering the gaps not served by
commercial bus companies. Fares are set using traditional staged faretables
based on a mix of historical fare data based around distance travelled and an
awareness of similar distances charged by commercial bus operators. 
3.2 It has become apparent in recent years that the fares charged on DRT and 
the fares charged on our scheduled bus services have become more and 
more at variance with each other on journeys of a similar nature. As the 
authority moves into the first phase of the Growth Deal Bus Revolution later 
this year, it’s logical to harmonise the calculation method for fares on all types 
of service across Moray. In undertaking this exercise, the desire is to offer a 
fare to the customer which both realises a fair financial return to the authority 
whilst remaining both affordable for fare paying customers and reflects the 
fare levels charged commercially by other bus companies. Under the Growth 
Deal project, all services will be operated under the “m.connect” banner. 
3.3 The greater majority of customers currently using Moray Council bus services 
are holders of the National Entitlement concession card, with on average 10% 
of customers paying a cash fare. It is predicted there will be an increase in
cash  fares once Bus Revolution commences as services will operate 
across a much wider part of the day. This expansion of provision will assist in 
tackling issues such as social isolation currently limiting the connection of 
people to their communities or workplace. A simplified fare structure is vital in 
making this easy. 
3.4 Transport Scotland reimburse over 60s and disabled National Entitlement 
concession passes at 55.9 pence per pound based on the adult single fare. 
The recently introduced under 22s free bus passes are reimbursed at 81.2% 
per pound for 16 -21 year olds and 43.6% for 5 – 5 years olds, both based on 
the adult (not child) single fare. Only single journey fares are sold through the 
scheme. 
3.5 The Covid pandemic saw a steep drop in passenger traffic on all bus services 
across the UK on account of the guidance advising essential travel only. The 
market is slowly recovering but there remains a customer confidence issue in 
travelling by public transport, such was the negativity of UK wide messaging 
for such an extended period. Along with a joint campaign with Stagecoach to 
promote public transport this year in Moray, promotion of a clearly understood 
fares product will assist in clarifying the message that public transport is open 
to all. 
4. PROPOSAL 
4.1  The proposal is to simplify the fares charged on all Council operated services 
across Moray into a simple zonal structure which can be easily 
understood by customers. This will allow the Council to promote its fares 
more readily online and in publicity through a simple map highlighting the 
zonal structure. It will also allow easy recognition of the correct fare charged 
as the app based DRT booking service comes on stream in the first phase of 
Bus Revolution. 
Page 4

Page 5

4.2 Fares charged will be pinned around four adult single fares across Moray
which will generate associated return fares, weekly tickets, etc. Any journey
requiring four or more zones will allow the customer unlimited travel that day
across the whole of Moray on Council operated bus services. The approach
allowing the purchase of a number of zones to equate with an unlimited travel
day ticket follows best practice in a number of commercial bus companies and
groups across the UK. The zonal map is attached in Appendix A with black
lines separating each fare zone on the map 
4.3 In deciding how to pitch the zonal fare structure, consideration was taken of 
Council’s current fares and compared with those of commercial bus service 
providers in Moray. Comparisons have also been made of similar journeys in 
other areas in Scotland, both urban and rural. Across the country, there is a 
strong trend supporting the clear easily grasped fares structures rising in 
several stages into a day ticket. 
4.4 The classes of tickets proposed across the zones are as follows: 
Adult Single 
Adult Return 
10 Journey 
Annual 
4.5 These will be implemented once approved by committee and Transport 
Scotland and systems and communications are ready for the revised fares,
anticipated to be early autumn.  Delegated authority is sought for the
introduction of weekly and monthly tickets once it is believed the market is
ready to support these ticket types, as days of operation and frequency are
increased in later phases of the Growth Deal project. All young people under
22 receive free travel in Scotland, removing the requirement to promote child
fares but under sixteen child fares will be offered at 50% of the adult fare for
visitors to Moray from outside Scotland (who will not hold a valid national
entitlement concession card) 
4.6 The table shown below indicates the fares proposed for the new zonal 
structure. At this juncture, it is not proposed to offer all the various options 
until the service is increased as Bus Revolution evolves. Those proposed for 
implementation on approval of this report are shown in bold font. Delegated 
authority is requested to allow the Head of Environmental and Commercial 
Services to enact the additional ticket types included in the table at an 
appropriate juncture. 
Adult
Sgl
Adult Rtn 10
Journey 
Annual Weekly Monthly
One Zone £3.00 £5.00 £20.00 £800.00 £24.00 £80.00
Two
Zones
£5.50 £9.00 £36.00 £1400.00 £42.00 £140.00
Three
Zones
£7.50 £9.00 £36.00 £1400.00 £42.00 £140.00
Four or
more
zones
£9.00 £9.00 £36.00 £1400.00 £42.00 £140.00 
Page 5

Page 6

4.7 The proposed fares have been compared against fares from local operators
and around the country. As the fare zones are broad, compared to a purely
mileage based pricing structure, it means that some of the lowest fares
increase and some of the higher fares are reduced. As a very rural area
particular consideration has been given to offering value for money over
longer journeys, which is enabled by the zonal approach. Equally, competitive
pricing on multiple journeys to compare favourably with fuel prices have been
a priority in balancing the fares across the different ticket types. As examples
for comparative fares that have been considered (not an exhaustive list as
each operator has multiple ticket types):
Ticket Type Price Validity
Stagecoach Moray Day
Rider
£9.50 All Stagecoach services in
Moray for one day
Stagecoach Elgin Commuter
Day Rider
£6.30 Stagecoach services across
Elgin including Lhanbryde for
one day
Stagecoach Craigellachie to
Dufftown
£3.10 Single journey
Stagecoach Seafield
Hospital, Buckie to The
Square, Cullen
£7.30 Single journey
First Bus Glasgow,
Kelvingrove Museum to
Buchannan Street Bus
Station (1.2 miles)
£2.65 Single journey
Xplore Dundee, 10-trip
bundle
£19.25 10 journeys, valid for up to
one year, only valid on
Xplore Dundee (network
approx. 8 miles wide from
Gowriehill to Barnhill)  
4.8 Budget has been identified within Revenue in the Growth Deal Fund to 
engage a marketing agency to promote the new structure alongside with the 
major benefits to customers being introduced through Bus Revolution. 
Procurement of the marketing service is subject to the approval of the Full 
Business Case and revenue budget. 
4.9 To allow for agile promotion of bus services to encourage uptake both of the
current services and those to be introduced as part of the Moray Growth Deal
(Bus Revolution) it is requested that delegated authority is granted to the
Head of Environmental & Commercial Services, in consultation with the Head
of Financial Services, to introduce short term promotions and fare offers as
part of a structured approach to marketing services. 
Page 6

Page 7

5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
This report supports the Corporate Plan priority around our future in
supporting economic development and a commitment to environmentally
sustainable travel. 
(b) Policy and Legal
Committee approval is required to authorise any change to charges
made by the Council. 
(c) Financial implications
An uplift in revenue will be generated on existing services and those to
be introduced through the Growth Deal by implementing the new fares.
Para 4 above sets out an overview of the benchmarking position and
rationale for the fares structure. By shifting the balance of priority
towards longer journeys and multiple journeys, there is also an increase
to the lowest fares in the system (which started at £1.15), but it should
be noted that these lowest fares are almost without exception used by
concessionary card holders rather than cash fare payers. By balancing
out the fares structure it is anticipated that the income generated will
increase the yield and go some way to mitigating the net subsidy per
passenger of current operations, but does not fully offset operating costs.
The improved yield is being incorporated into the financial case for Bus
Revolution which will be reported separately. 
(d) Risk Implications
Although approximately 90% of current passengers hold a
concessionary card, there’s a small risk of a negative reaction from cash
paying passengers purchasing a single ticket. 
(e) Staffing Implications 
There are no staffing implications incurred through the contents of this
report 
(f) Property
There are no property implications incurred through the contents of this
report. 
(g) Equalities/Socio Economic Impact
There are no direct equalities implications arising from this report.
However the increased awareness of the m.connect brand and services
plus the increased focus on fares will increase opportunities for
communities to connect and assist in the alleviation of social isolation. 
(h) Climate Change and Biodiversity Impacts
There are no direct climate change and biodiversity implications arising
from this report. Promoting uptake of public transport reduces CO2
emissions against individual car usage and will assist the Council’s drive
towards being carbon neutral by 2030. 
Page 7

Page 8

(i) Consultations
Depute Chief Executive (Economy, Environment and Finance, he Head
of Environmental and Commercial Services, , Legal Services Manager,
the Equal Opportunities Officer, and L Rowan, Committee Services
Officer have been consulted with any comments received incorporated
into this report 
6. CONCLUSION 
6.1 Local bus fares charged by Moray Council require an overhaul to 
harmonise the fares charged between Demand Responsive Transport 
services and timetabled local bus services whilst also maximising 
income balanced against community need. 
6.2 Simplification of the raft of current fares charges into a concise and
clear  zonal system will benefit customers across Moray. 
Author of Report: Donald MacRae, Public Transport Manager 
Background Papers:  
Ref:  SPMAN-524642768-766    
SPMAN-524642768-779 
Page 8

Page 9

© Crown copyright [and database rights] 2022 OS 100023422 Moray Council. You are permitted to use this data solely to enable you to respond to, or interact with,
the organisation that provided you with the data. You are not permitted to copy, sub-license, distribute or sell any of this data to third parties in any form.
Third party rights to enforce the terms of this licence shall be reserved to OS.
Appendix 1
Item 7a)
Page 9

Page 10

Page 10

Page 11

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 6 SEPTEMBER 2022 
SUBJECT: MORAY PATHWAYS LOCAL EMPLOYABILITY PARTNERSHIP
DELIVERY PLAN 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE 
1. REASON FOR REPORT 
1.1 To provide the Committee with the Moray Pathways delivery plan 2022-2025
and the new governance structure to align funds and integrate local
employability services. 
1.2 This report is submitted to Committee in terms of Section II (A) (2) of the
Council's Scheme of Administration relating to long-term financial plans. 
2. RECOMMENDATION 
2.1 It is recommended that Committee consider and note the delivery plan
and the governance structure for local employability funds and delivery. 
3. BACKGROUND 
3.1 The Moray Pathways Partnership is Moray’s Local Employability   
Partnership (LEP).   It is a multi-agency approach to the development of
shared objectives, the alignment of efforts and the commitment of resources
relating to employability.  We aim to make improvements in the labour market
that meet employer demand and in doing so, increase the level of
employment,  reduce the level of benefit claimants, improve productivity and
take steps to address in-work poverty. 
3.2 Supporting people into fair, sustainable jobs is central to delivering many of
the ambitions for an inclusive, sustainable economy with good population
health at its core. Employability services are pivotal to avoiding the widening
of social and economic inequalities. By supporting those who are most
vulnerable we recognise the vital role that a range of organisations across the
employability landscape play and are committed to protecting a diverse range
of provision and ensuring that the right support is put into place for those who
rely on these services.
Item 7b)
Page 11

Page 12

3.3 The delivery plan, set out in Appendix 1, outlines the investment devolved to
local employability partnerships to support the delivery of our local No-One
Left Behind plans outlined in the actions at the end of the report. 
In 2018 there was a national employability review and a No One Left Behind   
strategy to redesign more integrated and aligned employability services was
created.  In 2019, phase 1 was developed and the following 7 principles
where agreed: 
1. Treating people with dignity and respect, fairness and equality and      
continuous improvement
2. Providing flexible, needs based and person-centred support
3. Straightforward for people to navigate – no wrong door
4. Integrated and aligned with other services – building on the Scottish 
Approach to service design with the user at the centre
5. Providing pathways into sustainable and fair work
6. Driven by evidence including data and the experience of users
7. Support more people to move into the right job, at the right time 
3.4 Phase 2 involves a greater shift towards user engagement, service design,
partnership working, a shared measurement framework and a common
approach to inclusive communications. The partnership will build on the
strengths of existing national and local services, to better align funding and
improve the integration of employability services with other support to ensure
that services are designed and delivered around the needs and aspirations of
those using our services. 
3.5 The delivery plan outlines our vision and aims, an evidence led analysis of key
customer data and labour market information, and a detailed action plan and
key performance measures and targets for the next 3 years.  The delivery
plan is a live document and is subject to change on a yearly basis, depending
on local needs. 
4. SUMMARY OF IMPLICATIONS 
a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The Council led local employability partnership delivery plan  will
contribute to achieve the Corporate Plan priority to promote economic
development and growth, also the LOIP priority of a growing and
sustainable economy and in particular to the focus on targeted
approaches to those furthest from the job market. Progress against the
KPIs will be reported in that context to the Council and Community
Planning Board. 
b) Policy and Legal
The Council considers support for economic development issues on their
merits, against the objective to facilitate sustainable economic growth
and the desired outcomes of the Ten Year Plan and Corporate Plan. 
Page 12

Page 13

c) Financial implications
The Local Employability Partnership coordinates the funding provision
from Scottish Government as described in the Delivery Plan (Appendix
1) and outlined on page 24 of the delivery plan, for 2022/23 this includes
£1m for No One Left Behind, Young Person guarantee, Parent
employability and LTU employer Grant funding, £1m Child Poverty Fund,
£800k European social Fund and £1.5m Shared prosperity fund. 
d) Risk Implications
As with all external funding there are risks associated with the delivery of
targets and subsequent claims within projects, achieving spend within
the required timeframes, interpretation of rules applied by different
agencies and subsequent amendments to funding schemes. 
In order to mitigate these risks the service has in place controls for
auditing and monitoring purposes, maintains close contact with funders
and ensure those participating fully understand the grant criteria.
.
e) Staffing Implications
None 
f) Property
No property implications arising from this report 
g) Equalities/Socio Economic Impact
The actions and outcomes within the delivery plan contribute to tackling
inequalities in our communities and an equality impact assessment has
been sent to Scottish Government.   
h) Consultations
Consultation has taken place with members of the Local Employability
Partnership, Depute Chief Executive (Economy, Environment and
Finance), the Head of Economic Growth and Development, the Legal
Services Manager, the Property Asset Manager, the Equal Opportunities
Officer, the Head of Financial Services L Rowan, Committee Services
Officer have been consulted and comments received have been
incorporated into the report. 
5. CONCLUSION 
5.1 The report provides an update on plans and progress on work
associated with a range of local employability partnership interventions. 
Author of Report: Amy Cruickshank
Background Papers: No-one left behind action plan 
Ref: 
Page 13

Page 14

Page 14

Page 15

MORAY PATHWAYS
LOCAL EMPLOYABILITY PARTNERSHIP
Delivery Plan
2022-2025
Appendix 1
Item 7b)
Page 15

Page 16

21
Contents
Section 1: Introducing the Moray Pathways Partnership  2
1.1 Background Information  2
1.2 Our Approach to Delivery  2
1.3 Moray LEP Membership  3
1.4 Governance  4
1.5 Reporting arrangements  6
1.6 Self Assessment  8
Section 2: Strategic Vision, Goals, Action Areas, Impacts 9
2.1 Vision 9
2.2 Delivery Infrastructure 10
Section 3: Policy, Economic, and Operational Context 11
	
3.1	 Local	Economic/Labour	Market	Profile	 11
Section 4: Service Delivery 15
4.1 Service Delivery Priorities 15
4.2 Service Delivery Requirements and Approach 16
Section 5: Performance Management and Reporting 21
5.1 Key Performance Indicators 21
Section 6: Resource Requirements 24
6.1 People and Organisations 24
6.2 Contact Us 25
APPENDIX  25
Appendix 1 – Detailed SWOT  26
Page 16

Page 17

1.2 Our Approach to Delivery
The Moray Pathways Local Employability Partnership will follow the following 7 key principles. 
These principles were written to transform Scotland’s employability services in working
towards creating a better person-centred system:
2
Supporting people into fair, sustainable jobs is central to delivering many of the ambitions
for an inclusive, sustainable economy with good population health at its core. Employability
services are pivotal to avoiding the widening of social and economic inequalities. By
supporting those who are most vulnerable we recognise the vital role that a range of
organisations across the employability landscape play and are committed to protecting a
diverse range of provision and ensuring that the right support is put into place for those
who rely on these services.
2020–2022 has been an exceptional time with the onset of the COVID 19 global pandemic
having	significant	impacts	on	communities,	businesses	and	the	wider	economy.	Reports	
suggest those most disproportionately impacted by the pandemic are young people,
women, disabled people, those from minority ethnic backgrounds and a broader all-
age group who are at risk of long-term unemployment.  Therefore, strengthening the
partnership working, alignment and integration of local employability services is a key
contributor to economic recovery, supporting both inclusive economic recovery and social
renewal to mitigate the long term scars of unemployment, poverty and disadvantage.
There	has	been	significant	investment	from	Local	and	National	Government	to	support	the	
delivery of employability support services and initiate labour market growth.  The Moray
Pathways local employability partnership (LEP) is working with service users to identify local
needs and make informed, evidence-based decisions that support labour market demands.
The partnership will build on the strengths of existing national and local services to better
align funding and improve the integration of employability services with other support.  This
will ensure that services are designed and delivered around the needs and aspirations of
those using our services.
1.1 Background Information
1. Treating people with dignity and respect, fairness and
equality and continuous improvement
2. Providing flexible, needs based and person-centred support
3. Is straightforward for people to navigate – no wrong door
4. Integrated and aligned with other services – building on
the Scottish Approach to service design with the user at the
centre
5. Providing pathways into sustainable and fair work
6. Driven by evidence including data and the experience of
users
7. Support more people to move into the right job, at the right
time
Page 17

Page 18

No	One	Left	Behind	aims	to	support	those	facing	structural	inequalities	in	the	labour	market.	
Key	policy	drivers	which	connect	with	the	ambitions	and	delivery	priorities	of	No	One	Left	
Behind include:
3
1.3 Moray LEP Membership
Chair:  Local Authority Employability Lead
Deputy Chair:    UHI Moray Marketing and Business Development
Members: Barnardo’s Scotland (Moray Pathways network representative)
Community, Learning and Development (Moray Council)   
Department for Work and Pensions
DYW Moray
Economic Development (Moray Council)
Education (Moray Council) 
Enable Scotland (Moray Pathways network representative)
HIE
	
Integrated	Joint	Board	member	(NHS)
Skills Development Scotland
Third Sector Interface Moray
UHI Moray
Page 18

Page 19

4
1.4 Governance
The	Moray	Pathways	LEP	will	provide	regular	briefings	to	the	Moray	Economic	Partnership(	
MEP) and the MEP is governed by the Community Planning Board. We currently have 4 short
life working groups linking to priority themes from our action plan and the DYW Group is an
associated group as has other functions with regards to education priorities, that are wider
than the LEP.  The partnership also link and attend a variety of other strategic groups, such as
the CLD strategy group, child poverty action group, corporate parenting group and we provide
data to support the Local Outcome Improvement Plans (LOIP).  See diagram on page 5:
Page 19

Page 20

5
Moray Pathways Employability Partnership Governance Structure
Page 20

Page 21

6
National Context:
Scottish Government: No One Left Behind
1.5 Reporting Arrangements
The next phase of progression towards a better aligned and integrated employability service
in Scotland, will require wider engagement and partnership working with stakeholders and
communities.	Designing	and	implementing	local	services	that	are	person-centred,	flexible	and	
responsive to the changing labour market, while tackling inequalities and growing our local
economy, is needed now more than ever as we shape our collective economic and wellbeing
response to the current public health crisis.
Representatives from Scottish and local Government as well as third and private sector
providers and employers will continue to work collaboratively to develop guidance and
toolkits that will support service design and delivery locally. Our commitment to increase our
community engagement activity to respond to local need will support a more robust co-design
and co-production model that will enhance services and expand reach in our communities.
We require a greater sustained shift towards user engagement, collaboration and improved
partnership working through increased local governance. The Moray Pathways Local
Employability Partnership (LEP) is progressing priority employability actions through the
development of our self-improvement and delivery action plan and will continue to consult on
the	design	of	future	services	aligned	to	the	No	One	Left	Behind	strategy.	
The Moray Pathways (LEP) will continue to communicate and engage with stakeholders
regarding	local	and	national	progress	and	the	role	we	can	all	play	in	ensuring	‘No	One	is	Left	
Behind’.
Meeting will be 4 weekly, unless there is a necessity to meet in between dates in exceptional
circumstances.  The commissioning sub group will meet on a fortnightly basis to oversee the
commissioning process and score applications as an impartial group, the minutes of these
meetings will then be sent out to the wider LEP members and any objections to decisions
made can be lodged.  The commissioning sub group involves Moray Council, SDS, DYW Moray
and DWP.
During 2021-2022, the commissioning sub group created a local challenge fund application
process to support the commissioning of European Social Funds (ESF) for employability
provision.	Based	on	our	local	data	and	identified	needs	as	a	partnership	we	commissioned	the	
following provision to support local people who are out of work:
Barrier Removal Provision
Forres Area Community Trust (FACT) were commissioned to provide a digital upskilling
project for unemployed people in the Forres area. Parker Linden Theatre were commissioned
to provide a wide range of arts-based activities, to help improve the health and wellbeing of
individuals across all ages, who face a number of barriers to progress into learning, training
or work. Apex Scotland were commissioned to provide a specialist service to work with people
with criminal convictions, or at risk of committing offences to give them the necessary skills
to	change	their	behaviour	and	lead	fulfilling	lives.
Sector Based Training Provision
Enable Scotland, UHI Moray, Social Enterprise Academy and Elgin Youth Development Group
were commissioned to provide sector based provision for those who are ready to engage in
vocational training and work placements in key industries and sectors.
Page 21

Page 22

7
During 2022 the commissioning sub group will utilise our local employability partnership
budget to score applications from within the following service categories: 
Page 22

Page 23

8
1.6 Self-assessment
In April 2021 all members of the partnership participated in a survey to provide a self-
assessment of the partnership and its functions.  The actions were as follows and any
outstanding have been included in section 1 of our action plan: Strengthen the functions and
effectiveness of Moray Pathways.
• Create a calendar of reporting deadlines
• Create a local delivery plan for the LEP
• Expand group membership
• Review LEP membership & roles annually
• Add conflict statement to LEP Terms of Reference (TOR)
• Commissioning sub-group (CS) to discuss all funding bids to
ensure transparency and amend TOR to show role of CS
• Write demand statement to include evidence of demand,
supply and need (including user feedback)
• Successful bidders to sign data sharing agreements with the
LEP to provide relevant data on those accessing LEP funded
services/provision
• Commissioning framework asks that bidders have to
demonstrate how communities are engaged with the design of
the provision
• Scottish Approach to Service design (SASD) embedded
into tendering reporting process to highlight community
involvement
• Integrate quality improvement methodology into delivery plan
& commissioning framework
Page 23

Page 24

9
Improve the income, wellbeing and prospects of our communities with particular focus on
improving access and participation from our priority groups:
• Long-term unemployed
• Physical and mental health conditions, including disabilities 
• Low income families and lone parents with children experiencing poverty
• Underemployed
• Young people most at risk of not participating in learning, training or work
(e.g. care experienced)
• Minority Groups
• Veteran Groups
• Maximise employer engagement, job creation initiatives and access to fair
work.
• Increase skills, qualifications and qualification levels through sector based
training and MA opportunities aligned to local employment opportunities
and jobs of the future
• Increase utilisation of Community Benefit/wealth in procurement
opportunities across the wider Employability Partnership, widening
opportunities across all public sector organisations and involvement in
private sector social return on investment opportunities.
Improve employability outcomes for the people of Moray and address skills
gaps in key economic sectors.2.
3. We will work in partnership with local employers, anchor organisations
and communities to create fair jobs for the future, increasing the skilled
workforce, stimulating labour market growth and enhancing local wealth.
Strengthen the functions and effectiveness of the Moray Pathways Local
Employability Partnership 
Improve the governance, planning and implementation of employability support services to
ensure an all age, stage provision with a person-centred tailored approach to local need and
priorities,	aligned	to	the	National	No-One	Left	Behind	strategy	and	LEP	improvement	plan	
actions.
1.
2.1 Vision
In the next 3 years Moray Pathways will have maximised the opportunities provided by
the	transformation	of	Scotland’s	employability	system	through	No	One	Left	Behind	and	
delivered outstanding and recognisable improvements in outcomes for our customers.
Those improvements will have been delivered through the following strategic aims: 
VISION 2022-2025
Page 24

Page 25

10
2.2 Delivery Infrastructure
Our approach to commissioning and the delivery of the plan is described in the below
diagram.
On behalf of the partnership, the chair of the Moray Pathways LEP will provide quarterly
reports to Scottish Government, LOIP, CLD and annual reports to SLAED.
All the partners within the Moray Pathways network will provide information and input to the
Moray Pathways Local Employability Partnership group to ensure local and national reporting
timescales are met and will;
• Provide a collective leadership approach, ensuring a robust process
for decision making that values the contributions of partners and
contributes to improved outcomes and opportunities
• Develop, implement, and regularly review the delivery plan to ensure
it’s aligned to identified local and national priorities
• Agree data sharing and resource mapping communications to co-
ordinate development priorities and areas of improvement
• Implement a scrutiny and performance monitoring framework aligned
to the commissioning framework and employability delivery toolkit
• Engage in the commissioning process 
• Co-ordinate an annual employability event to reflect on local success
and encourage future developments
• Provide insight and representation of organisation and/or sector,
impartially
Page 25

Page 26

Hidden Talent
11
Section 3:
3.1 Local Economic/Labour Market Profile 
Moray has a substantial pool of hidden talent. Our services will focus on enabling
people who are currently outside of the labour market to find opportunities within
Moray.  Our analysis* estimates the following hidden labour market
groups can be supported:
*stats	combined	from	NOMIS	(July	2022	and	Stat	Explore	Department	of	Working	
Pensions system)
Page 26

Page 27

12
Geographical Approach
Page 27

Page 28

13Page 28

Page 29

14Page 29

Page 30

16-24 25+
• People with disabilities
including Mental Health
• Care Experienced
• Disengaged from Education,
Employment, Training
(NEET)
• School Leavers with
unconfirmed	destinations	&	
Unknown
• Young people within SIMD
communities
• Refugees
• Minority Groups
• Young Parents
• Low income families and
lone parents
• Underemployed
• People with disabilities
including mental health
• Low	Income	Families	&	
Lone Parents
• SIMD Communities
• People with disabilities
including mental health
• Low	Income	Families	&	
Lone Parents
• SIMD Communities
• Long Term Unemployed
(12 months plus)
• Minority Groups
• Ex-Offenders
• Refugees
• Underemployed
15
Local priority target groups:
4.1 Service Delivery Priorities
Section 4: Service Delivery & Impacts
Page 30

Page 31

Target
Group
Action/Intervention Lead
Partner
Source of
Investment
Outcome
Measures
KPI
All target
groups
Commissioning Services
1.1  Co-ordinate the development and
use of the new Dynamic Purchasing
System
1.2  Integrate continuous improvement
tools and community wealth building
outcomes into all commissioned provision
1.3  Testing new dynamic purchasing
commissioning system
1.4  Create data sharing agreements 
and new planning meetings to improve
integration across key policy areas,
including social work, justice, health,
Community Learning and Development
and housing
1.5  Create a clear Moray Pathways
communication and marketing strategy
1.6  Develop opportunities for Moray
Pathways practitioners to engage in
professional development
1.7  Evaluate the impact of all funded
support and provision
1.8  Carry out annual self assessment
Moray
Council
LEP
Commissioning
Group
Moray
Council
Skills
Development
Scotland
UHI Moray
Moray Council
Moray Council
Moray Council
Moray Council
Scottish
Government
European
Social Fund
Shared
Prosperity
Fund
• All relevant provision is
commissioned through the new DPS
system 
• Increase the number of individuals
engaging, participating and
progressing within a range
of learning, training or work
opportunities. 
• Increase co-design and community
engagement to develop services that
meet local needs
• Reduce the percentage of
unconfirmed	in	annual	and	monthly	
participation measure.    
• Increase the number of individuals
engaging with support and training,
broken down into age groups and
characteristics in line with local
need. 
• Hub outcome reports. 
KPI 1
KPI 8
KPI 1
16
4.2 Service Delivery Requirements and Approach 
Moray Pathways Action Plan 2022-2025
1: STRATEGIC AIM: Strengthen the functions and effectiveness of Moray Pathways
Page 31

Page 32

2: STRATEGIC AIM: Improve employability outcomes for the people of Moray and
address skills gaps in key economic sectors.
Target
Group
Action/Intervention Lead
Partner
Source of
Investment
Outcome
Measures
KPI
All	No-One	
Left Behind 
Target
Groups
2.1.1  Identify and evaluate gaps in
support and provision for all target
group
customers.
2.1.2  Identify relevant projects to
provide training, support and supported
employment options for all individuals
within the target groups and addresses
the	identified	gaps.	
2.1.3  Commission projects to address
the	gaps	in	provision	identified	from	the	
mapping
Moray Council
LEP
Commissioning
Group
No-One	left	
behind
Young
Person’s
Guarantee
European
Social Fund
Shared
Prosperity
Fund 
Gaps	identified	
Interventions	and	projects	identified.	
Projects Commissioned.
Increase the number of individuals
engaging, participating and
sustaining learning, training or work
opportunities.
KPI 1
Mental
Health
Conditions 
2.2.1  Work with all relevant partners to
identify barriers related to employers not
employing people with disabilities. [Also
see section 3]
2.2.2  Work with all relevant partners
to	develop	specific	targeted	provision	to	
address mental health issues
Commissioned
Services
LEP Poverty
Sub Group
Increase the number of individuals
engaging, participating and
sustaining learning, training or work
opportunities.
KPI 1
KPI 3
Physical
conditions,
including
disabilities
2.3.1  Deliver a test of change project
supporting students with disabilities with
their transition from UHI Moray.
2.3.2  Work in collaboration with
Department of Working Pensions and
Skills Development Scotland to identify
a dataset of potential people who could
work and create an engagement plan with
the help of health, social work and other
agencies.
Increase in the number of employers
employing individuals with recognised
disabilities both physical and mental
Increase the number of individuals
achieving sustainable outcomes
and contribute to a decrease in the
disability employment gap
KPI 5
KPI 1
17Page 32

Page 33

Target
Group
Action/Intervention Lead
Partner
Source of
Investment
Outcome
Measures
KPI
Low income
families and
lone parents
with children
experiencing
poverty
2.4.1  Work in partnership across all
key policy areas to tackle barriers to
employment for parents 
Poverty LEP
sub group
Scottish
Government
Shared
Prosperity
Fund
Increasing household income,
reducing child poverty, through
engaging, participating and
sustaining fair work and in work skills
development opportunities
KPI 4
Care
Experienced
Young
People
2.5.1 Improve data collection and
tracking/monitoring via post school
pathways planning meetings
2.5.2 Collaborate with all relevant
partners
2.5.3  Increase engagement in all
employment, education and training
opportunities
Corporate
parenting
strategic group
Education and
Employability
Pillar
Scottish
Government
European
Social Fund
Scottish
Government 
Attainment
funds
Increase in the number of care
experience young people participating
and sustaining learning,  training and/
or employment
KPI 1
Ethnic
Minorities  
(including
refugees)
2.6.1  Co-ordinate ESOL community
provision to support the needs of
families seeking support
2.6.2 Collaborate with relevant
partners	to	identify	the	specific	needs	
of ethnic minorities to successfully
move into employment or training.
UHI Moray
Moray Council
(Resettlement
group) 
Scottish
Government
European
Social Fund
Shared
Prosperity
Fund
Increase the number of individuals
engaging, participating and sustaining
a range of learning, training or work
opportunities.
KPI 1
Veteran
Groups
2.7.1  Promotion of partnership
to relevant groups within armed
forces organisations and veteran
organisations
Armed Forces
Covenant
Group
Community
Learning and
Development
Scottish
Government
European
Social Fund
Shared
Prosperity
Fund
Increase the number of individuals
engaging, participating and sustaining
a range of learning, training or work
opportunities
KPI 1
18Page 33

Page 34

Target
Group
Action/Intervention Lead
Partner
Source of
Investment
Outcome
Measures
KPI
Under-
employed
2.8.1  Identify sectors of low income
2.8.2  Identify	specific	target	group	
where underemployment is more
common ie: lone parents/females/
migrant workers/refugees/veterans
2.8.3  Identify targeted approaches/
provision to engaging with
underemployed individuals
Highlands
and Islands
Enterprise
Skills
Development
Scotland
Department
of Working
Pensions 
[NOMIS]	
Child Poverty
Group
Parenting
project
Department
of Working
Pensions 
Armed Forces
Covenant
LEP  +
Commissioning
Group 
Scottish
Government
European
Social Fund
UK GOV
Sectors	identified	
Increase the number from the target
group participating in upskilling
opportunities
Provision	identified	and	commissioned	
and
Increase in number of individuals
using the Moray Employer
Recruitment Incentive scheme as
an opportunity to gain new skills/
vocational
Contribute to an increase in household
income
Accreditation and sustain
employability outcomes
KPI 1
19Page 34

Page 35

20
3: STRATEGIC AIM: Work in partnership with local employers, anchor organisations and communities to
create fair jobs for the future, increasing the skilled workforce, stimulating labour market growth and
enhancing local wealth.
Target
Group
Action/Intervention Lead
Partner
Source of
Investment
Outcome
Measures
KPI
ALL target
groups
3.1.1  Link employers within key growth
sectors for all sector based provision
3.1.2  Encourage employers to offer
supported employment job placements
for our high priority groups via the Moray
Employer Recruitment Incentive scheme
3.1.3  Create an employer engagement
subgroup to streamline and co-ordinate
employer engagement across the
partnership
3.1.4  Promote the fair work agenda to
Moray employers including Flex Work
3.1.5  Work together with employers to
overcome barriers to work
All partners Scottish
Government
European
Social Fund
Improving Fair Work within local
labour market (fair rate of pay,
flexible	working,	reasonable	
adjustments, etc)
Streamline employer engagement
across the partnership through the
European Social Fund  commissioned
programmes and the Developing
the Young Workforce employer
engagement group
KPI 7
ALL target
groups
3.2.1  Write an apprenticeship
strategy to encourage public sector
organisations to increase uptake of
apprentices.
3.2.2  Link employers to sector-
based training provision that is
commissioned
3.2.3  Employ a Third Sector
employer engagement worker to
build the capacity of Third Sector
Employers
3.2.4  Engage with the green
jobs workforce academy and just
transition opportunities
UHI Moray
Developing
the Young
Workforce
Skills
Development
Scotland 
Moray Counci
Increase	skills,	qualifications	and	
qualification	levels	through	sector	
based training and MA opportunities
aligned to local employment
opportunities and jobs of the future
Improve gender pay gap via Moray
Employer Recruitment Incentive
placements
KPI 1
Page 35

Page 36

21
Strategic Outcomes: Local and
National Priorities and Policy
Intent
Indicator Baseline
(Scottish
Average
Rate)
Target Source Frequency of
Updated
Information
KPI 1
Increase the number of
individuals engaging,
participating and sustaining
a range of learning, training
or work opportunities.
The 2021 Annual Participation Measure in
Moray: 16–19-year-olds in Moray 91.8%
were in education, employment or training
and personal development
359 young people (2021-2022) and adults
25 plus participated in learning, training and
work across Moray Pathways Partnership
88 progressed into employment
185 progressed into learning and training
Numbers	sustaining	after	13,	26	and	52	
weeks (not previously recorded)
Numbers	participating	and	sustaining	
across all 7 high priority target groups
(not recorded across full partnership in
2021/2022 )
92.2%
N/A
N/A
N/A
Increase by 0.4%
Increase by 10%
Increase by 10%
Baseline -
2022/2023
Increase by 5%
2023-2025
Datahub
reports
Hanlon
Moray
Pathways
Client
Database
Hanlon
Database
Quarterly
Quarterly
Quarterly
KPI 2
Reduce the number of young
people 16-19 years with an
unconfirmed status
5.7%	Unconfirmed	
Annual Participation Measure (2021)
16–19 Year-Olds in Moray
4.6% Reduce by 1.1% No-One	left	
behind  report
from Hanlon
and sent to
SDS
Monthly
Participation
Measure / Data
Hub reports
Monthly
Annual
Monthly
Section 5: Performance Management and Reporting
5.1: Key Performance Indicators
Page 36

Page 37

22
Strategic Outcomes: Local and
National Priorities and Policy
Intent
Indicator Baseline
(Scottish
Average
Rate)
Target Source Frequency of
Updated
Information
KPI 3
Reduce no of claimants with
an economic inactive status
Long term Sick 4300 = 31 % 
Looking after Family/home:
2700 = 19.5 %
Disability	benefits	claimants:	2688
No	work	requirements:	2188
29 %
17.3%
N/A
N/A
Reduce by 1.3% 
Reduce by 2.2%
Reduce by 5%
Reduce by 5%
NOMIS	
NOMIS	
Stat Explore
Stat Explore
Annually
Quarterly
Quarterly
KPI 4
Increasing household
income, reducing child
poverty, through access to
fair work and in work skills
development
% Children in Childcare 24%
% Children in Poverty 23.4 %
% Underemployment 10.4%
% of parents participating in Moray
Pathways provision who have increased
income (Threshold is £19,200)
27.2 %
24.3 % 
8.1 %
N/A	
Reduce by 3.2%
Reduce by 0.9%
Reduce by 2.3%
Increase of 15 %
Statexlore
Statexplore
NOMIS	
Hanlon
Reports
Quarterly
Quarterly
Annually
Quarterly
KPI 5
Contributing to the decrease
in the disability employment
gap, through skills
development and access to
fair work
Disability	benefits	claimants:	2688
No	work	requirements	(includes	disability	
and mental health conditions): 2188
Monthly Participation Measure – age 16-19
years	–	ASN	numbers	participating?	
N/A
N/A
Reduce by 5%
Reduce by 5%
Statexplore
Statexplore
Datahub
Reports
Hanlon Reports
Quarterly
Page 37

Page 38

Strategic Outcomes: Local and
National Priorities and Policy
Intent
Indicator Baseline
(Scottish
Average
Rate)
Target Source Frequency of
Updated
Information
KPI 6
Contributing to the
decrease in the digital
poverty gap through skills
118 One2One individual (all age) digital
sessions carried out in hub in 1st year of
digital project
40% of people (all age) who received
devices through Hub stated that they had
low or no digital skills.
Lloyds Bank (2021)
reports that 2.7 million
(5%) people can
access the Internet but
lack the ability to use
it to its full advantage.
Lloyds Bank (2021)
reports that 11 million
people (22%) still
lack essential digital
skills for life, with lack
of education, lower
incomes, and older
age all contributing to
lower levels of digital
skills.
Increase by 10%
across partnership,
with focus on
access to digital
services.
Decrease by
5%	&	evidence	
progression of
‘Essential Digital
Skills’
Hub Digital
Inclusion Project
Data
Hub Digital
Inclusion Project
Data
Quarterly/
Annually
Quarterly/
Annually
KPI 7
Improving Fair Work
within local labour market
(fair rate of pay, flexible
working, reasonable
adjustments, etc)
35 (2022-2023)  local employers
signed up to the Young Persons
Guarantee
6	employers	participated	in	flex	works	
training programme
80% of all Moray Employer
Recruitment Incentive applications
from local employers are paying real
living	wage.	New	phase	has	made	this	
compulsory requirement. 
N/A	
N/A
N/A	
Increase by 10%
Increase by 5 %
Hanlon Reports
Hanlon Reports
Hanlon Reports
Quarterly
Quarterly
Quarterly
KPI 8
Scottish Approach to
Service Design: Increase
co-design and community
engagement to develop
services that meet the
needs of users
Community Engagement
Potential qualitative user experience
measures: Evaluation, alignment with
Customer Charter
X no of Case Studies
LEP Reporting Baseline to be
established in
2022-2023
Sources to be
confirmed
Bi-annually
23Page 38

Page 39

6.1  People and Organisations
Section 6: Resource Requirements
Within the Moray Pathways network area there is a mixed economy of service delivery
across third, private and public sectors.
Through our service mapping, evidence based planning and service user consultations
the	plan	has	been	developed	to	meet	the	priorities	identified	within	the	Moray	area,	with	
resources and organisations based upon both quality of service and value for money
Investment Summary (2022-2023)
24Page 39

Page 40

Moray Pathways Employability and Training Hub
Francis Place, Elgin, IV30 1LQ
moraypathways@moray.gov.uk
moraypathways.co.uk
6.2: Contact Us
25Page 40

Page 41

Strengths Weaknesses
Monthly Participation Measure April 2022 (16-19
years) 89.4% 
• 021-2022 78% of participants engaged with
the Moray Council Employability team are
participating in Moray Pathways training and
employment opportunities Employment rate
75.3 % Moray, 73.5 Scotland Moray Employer
Recruitment Incentive, no on placement and
no sustained
Moray LMI – Growth/High Replacement Demand
Sectors (Skills Development Scotland RSA)
• Human	health	&	Social	Work
• Public Administration and defence
• Professional	and	scientific	technical	activities	
• Education
• Administrative and support service activities
In the Moray Growth Deal Region, Manufacture
of Beverages was the greatest specialism, with
the percentage of employment in this sector 7
times the Scottish average. Other sectors that
had above average concentrations in the Moray
Growth Deal Region included:
• Manufacture of Textiles (6.7 times as
concentrated)
• Forestry and Logging (5.0 times as
concentrated)
• Manufacture of Food Products (4.1 times as
concentrated)
• Fishing and Aquaculture (3.7 times as
concentrated)
Apprenticeships:
• As of 31 December 2021, there were 665
Modern Apprentices in training (Skills
Development Scotland)
• From 1 April to 31 December 2021, we
supported 249
• The Modern Apprenticeship achievement rate
• in Moray is 70.7%F
16–24-year-olds UC Claimants ( May 2022)
Total 995 
25 plus UC Claimants ( May 2022)
Total 5648
• The 2021 Annual Participation Measure in
Moray shows 16–19-year-olds in Moray 91.8%
were in education, employment or training
and personal development
• % Economic Inactive/long term sick/disabled
rate 30.5 % and Scotland average 28.7%
• % Gender Employment gap 8.5 % and
Scotland 5.1 %
• Underemployed rate 10.4 % Moray, 8.1 %
Scotland
• Percentage Of Households That Are Workless
–	15.5%	(NOMIS	2020)
• 6.3%	Unconfirmed	–	Participation	Measures	
16–19-Year-Olds in Moray
• 3 X Breakfast club and after school providers
across Moray
• Employers believe that a number of young
people lack the basic life skills needed for
work, like personal responsibility, concern
for others and listening skills. (DYW Positive
Futures Survey)
• Rurality of the region – transport provision/
rural poverty
• Lack	of	Childcare	Provision	–	Nursery	&	
Before/After School Care
• Lack of apprenticeship availability is perceived
as main barrier
• Lack of awareness on where to seek
information regarding Apprenticeships
• Outside	of	‘traditional’	there	is	significant	
desire for apprenticeships in Hospitality,
Business, and Education
• Recruitment Crisis affecting Hospitality,
Manufacturing, Construction sectors
Appendix 1: Detailed SWOT
26Page 41

Page 42

Opportunities Threats
• Increase number of providers offering
breakfast/ after school support to parents
(wraparound)
• Moray Pathways new employability support
and sector based investment into new 
provision
• MERI funding
• Moray Growth Deal
• Just Transition Fund, Shared Prosperity Fund
&	Child	Poverty	funding
• Green jobs
• Digitalisation/AI
• UHI Moray FE and HE Provision
• Level 4/5 Foundation Apprenticeships
• Real Living Wage Drive
Largest employing sectors in Moray in 2021
Public administration and defence 12.6%,
Retail trade, except of motor vehicles 9%,
Education 8.2%, Human Health Activities 7.6%,
Manufacture of Food Products 5.3%
The largest occupations in Moray in 2021
Elementary Occupations: Clerical and Services
related 10.2%, Administrative Occupations 8.2%,
Corporate Managers 7.6%, Sales Occupations
6.9%, Skilled Metal and Electrical Trades 6.6%
The highest value sectors in the Moray
economy were forecast to be:
Manufacturing £629m
Real Estate Activities £273m
Human Health and Social Work Activities £231m
• Economic impact and funding re sustainment
of supported job opportunities
• Continued funding/Term of Funding/Political/
Policy Change
• Partnership commitment
• Provider commitment/ability/capacity re
delivery
• Impact of COVID pandemic on health,
economy and already marginalised groups,
greater equalities divides
• Poverty:	In	Work	Poverty,	Child	Poverty	&	Fuel	
Poverty
• Economic Growth Rate locally
Moray Business Counts	(NOMIS	2021)
Micro (0-9) 2805 businesses – high % = risk to
economic stability but also opportunity for growth
Small (10-49) 325 businesses
Medium (50-249) 35 businesses
Large (250+) 10 businesses
Moray LMI - Declining Sectors (SDS RSA)
Accommodation and food service
Construction
Arts, Entertainment, and recreation
Over the longer term (2024-2031) employment
within Moray is forecast to decrease. In 2031,
it is forecast that there will be 1,000 fewer
people in employment compared to 2024. (Skills
Development Scotland RSA)
In 2020-21, 43 pupils started Foundation
Apprenticeships in schools at SCQF Level 4-6 in
Moray.
In 2020-21 there were 10 registered Graduate
Apprentices with a home address in the local
authority and 12 registered with employers based
in the area
27Page 42

Page 43

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 6 SEPTEMBER 2022 
SUBJECT: MORAY HYDROGEN STRATEGY 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To seek the agreement of the Committee to adopt the Moray Hydrogen
Strategy and to agree that an application to the North East Just Transition
Fund to progress action on the strategy be submitted if the Council’s
expression of interest is successful. 
1.2 This report is submitted to Committee in terms of Section III (F) (33) of the
Council's Scheme of Administration relating to providing, developing and
monitoring the Council’s Economic Development and Infrastructure Services.
2. RECOMMENDATION 
2.1 It is recommended that Committee:- 
(i) approves and adopts the Moray Hydrogen Strategy (Appendix 1)
including recommended actions; and
(ii) notes the Council’s expression of interest to the North East Just
Transition Fund (Appendix 2) in respect of funding for hydrogen
pilot project feasibility studies, and the development of a costed
delivery plan. 
3. BACKGROUND 
3.1 On 10 March 2021, the Council adopted a Climate Change Strategy (CCS) for
2020-2030. In response to the actions approved as part of the CCS, and
funded through the Improvement and Modernisation Programme, consultants
were commissioned to develop a Moray Hydrogen Strategy (para 13 of the
Minute refers). 
3.2 Hydrogen is fast becoming a key energy resource in the transition to a low
carbon future. When produced from renewable energy sources, hydrogen is a
zero carbon, zero emissions fuel that can be used for heavy duty vehicles,
industrial uses and to heat homes.
Item 7c)
Page 43

Page 44

3.3 A hydrogen economy is an economy that relies on hydrogen as the
commercial fuel to deliver a substantial fraction of an area’s energy and
service needs. Developing a hydrogen economy in Moray during the short to
medium term, including connecting into adjacent areas, could:
• contribute towards a reduction in greenhouse gas and particulate
emissions;
• improve the security of Moray’s energy supply;
• increase and make better use of local renewable energy generation;
and
• help to address fuel poverty issues, particularly in rural areas.
3.4 Development of a hydrogen economy is a national priority. In December 2020,
the Scottish Government published a Hydrogen Policy Statement which aims
for Scotland to be a “leading hydrogen nation in the production of reliable,
competitive, sustainable hydrogen”. 
3.5 Highlands and Islands Enterprise (HIE) seek to advance a hydrogen economy
across the region and were a key stakeholder in the development of the
Moray Hydrogen Strategy. HIE therefore sought that the strategy include
information on the decarbonisation of Moray’s distilling industry and other key
projects including the infrastructure required to produce, store and supply
hydrogen, and provided funding to facilitate this expanded remit.
3.6 Wider stakeholder engagement was carried out by the consultants in
collaboration with the Council and HIE. Over 70 stakeholders located within or
adjacent to Moray were identified and consulted with in a series of interviews
and follow-up sessions. Stakeholders represented the following areas:
• Adjacent local authorities;
• Community groups;
• Industry;
• Renewable energy developers;
• Transport sector;
• Internal representatives;
• Distilleries;
• Public sector bodies; and
• Renewable energy influencers. 
3.7 Feedback from the stakeholder engagement process revealed a very positive
outlook that hydrogen can form part of the solution to achieving net zero, and
that action must be taken promptly. The process identified many stakeholders
who would like to be involved in the next steps in development of a Moray
hydrogen economy, as well as several opportunities and challenges to
consider. 
4. PROPOSED STRATEGY
4.1 The proposed strategy is presented in Appendix 1. The strategy
demonstrates that there is a demand for hydrogen within Moray and several
opportunities to develop a hydrogen economy which would retain significant
benefits within the area by progressing a series of short, medium and long-
term actions.
Page 44

Page 45

4.2 A series of short-term actions to be taken up to 2030 have been identified
within the strategy as necessary to generate interest, demand and capacity for
hydrogen in Moray. The creation of a delivery plan for the strategy will be
progressed to include the feasibility of actions such as:
• deciding how the council will progress development of a hydrogen
economy – as a supporting facilitator or by leading developments;
• establishing a hydrogen steering group including key stakeholders
identified by the strategy to develop a cohesive vision and drive for the
development of a hydrogen economy; 
• establishing a hydrogen stakeholder network including industry,
community and education groups;
• investigating funding opportunities and applying for initial funding to 
engage a dedicated team to develop hydrogen economy opportunities;
• promoting hydrogen knowledge development in schools and engaging
with further education establishments to progress programmes which
deliver necessary skills to support the hydrogen economy;
• setting up, funding and initiating/delivering at least one pilot project;
• determining the suitability and cost of pilot projects proposed in the
strategy; and
• developing an appropriate organisational vehicle to drive forward the
hydrogen economy within Moray.
4.3 In the medium term, from 2030 to 2040, it is forecast that demand for
hydrogen will have increased significantly. At this time, there will be a focus on
growing the hydrogen supply and developing a network of refuelling stations.
This will create the necessary capacity for an industry switch to hydrogen and
to further decarbonise the transportation element of hydrogen production.
4.4 From 2040 onwards, it is envisaged that Moray’s hydrogen economy will be
fully developed. A key priority in the long-term will be continuing production
and importing/exporting hydrogen as part of the national hydrogen pipeline
network. Consolidating existing hydrogen facilities and identifying further
expansion opportunities will be necessary. As technologies are mainstreamed
and costs decrease, there will be potential for smaller scale community
hydrogen projects, particularly in off-grid areas.
5. DELIVERING THE STRATEGY
5.1 Upon approval of the strategy, officers will begin to implement those short-
term actions which can be accommodated within existing staffing resources. 
5.2 A hydrogen steering group will be formed including representation from the
Council, HIE, and key stakeholders from the industrial base and wider
community as proposed within the strategy. The progress of the steering
group will be reported on a quarterly basis to the existing Climate Change
Board and within wider CCS routine updates to the committee.
5.3 Consideration has been given to the resources required to achieve the aims of
the strategy. There is no revenue budget other than that for the Climate
Page 45

Page 46

Change team and so any additional revenue funding will be subject to external
funding applications.  There is a climate change capital budget of £500,000
will could potentially be used for a pilot project, depending on the details of
that project. Both revenue and capital proposals would be the subject of
separate reports following the creation of a detailed delivery plan.
5.4 Following the report on the North East Just Transition Fund considered by
Council on the 29 June 2022, the agreement of Group Leaders was sought to
enable an £80,000 expression of interest (EOI) to be submitted to the fund
(Appendix 2). The EOI sought funding to cover the cost of pilot project
feasibility studies identified within the short-term actions. These include:
• Feasibility designs to determine preferred pilot project(s) – locations,
size and details; and
• Feasibility work on the conversion of Moray Council’s vehicle fleet to
hydrogen fuel.
5.5 Community wealth building opportunities will be explored throughout the life of
the strategy. The use of contractual commitments around community benefits
performance and delivery can ensure that locally relevant positive impacts
and community wealth are generated due to the work involved to progress the
strategy’s aims.
6. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Development of a Moray Hydrogen Strategy was an action of the
Council’s Climate Change Strategy 2020-2030 which supports the
priorities set out in the Corporate Plan 2019-2024.
(b) Policy and Legal
The Climate Change (Scotland) Act 2009 places a duty on public bodies
to act in a way that they consider most sustainable and in the way best
calculated to deliver the emission reduction targets set in the Act.
(c) Financial implications
There is a climate change budget of £500,000 in the capital plan for
2022/23 which could potentially be used for a pilot project. There is no
budget for any additional revenue expenditure and further funds will be
sought via external funding applications, including the North East Just
Transition Fund.
(d) Risk Implications
There is a risk that the Council will be unable to comply with its own net
zero target and subsequent statutory net zero targets if work to develop
sustainable energy systems does not commence. If a hydrogen strategy
is not implemented, Moray would fail to maximise the benefits of
developing a hydrogen economy.
(e) Staffing Implications
There will be a requirement for staff from several services including
Strategic Planning & Development, Housing & Property and
Environmental & Commercial Services to contribute to the progression of
actions within the strategy and the work of the hydrogen steering group.
Page 46

Page 47

(f) Property
There will be property implications linked to the delivery of the Moray
Hydrogen Strategy around provision of depot facilities linked to hydrogen
fleet vehicles. These implications will be set out in more detail as the key
actions relating to fleet decarbonisation are agreed and progressed.
(g) Equalities/Socio Economic Impact
There are no equalities/socio economic impacts at this stage. This will be
considered and an equalities impact assessment carried out where
funding applications are progressed.
(h) Climate Change and Biodiversity Impacts
Adoption of a hydrogen strategy will assist with the Council’s
decarbonisation target to be net zero by 2030, and the transition to net
zero across the wider Moray area, in line with the aims of the Moray
Council Climate Change Strategy 2020-2030. By piloting hydrogen
projects within Moray, it will be possible to influence, educate and
engage the wider community in climate action initiatives.
(i) Consultations
Consultations have been undertaken with the Depute Chief Executive
(Economy, Environment and Finance), the Head of Economic Growth &
Development, the Head of Housing and Property, the Head of Education
Resources & Communities, the Acting Housing & Strategy Development
Manager, the Property Asset Manager, the Community Wealth Building
Officer, the Energy Officer, the Equal Opportunities Officer, the Legal
Services Manager, the Elected Member Climate Change Champion and
L Rowan, Committee Services Officer. Where comments have been
received, these have been included within the report.
5. CONCLUSION 
5.1 The Moray Hydrogen Strategy supports the development of a hydrogen
economy in Moray. It will enable the necessary capacity building for an
industry shift to hydrogen, and the production of green hydrogen to
reduce reliance on carbon intensive energy sources. 
5.2 The recommendations support a sustainable approach to achieving
emissions reduction in line with the Council’s own net zero target and
its duties under the Climate Change (Scotland) Act 2009. 
Author of Report: George Gunn, Climate Change Strategy Officer
Background Papers: 
Ref: 
Page 47

Page 48

Page 48

Page 49

Moray
Hydrogen
Strategy
Report
May 2022
Appendix 1
Item 7c)
Page 49

Page 50

3  I  Mott MacDonald  | Moray Hydrogen Strategy Report
DRAFT
Moray Hydrogen Strategy Report DRAFT  I  Confidential | Mott MacDonald | 3
Moray Council has a commitment to become
Carbon Neutral by 2030 and to provide the
necessary leadership to local business and
communities to assist in the Moray wide
transition to net zero by 2045. The Council
approved a Climate Change Strategy on 10th
March 2021 with a high-level action plan.
Executive Summary
Moray has a population circa 97,000
and has high levels of manufacturing
including 50% of Scotland’s distilleries
and global brands.
Hydrogen is fast becoming a key
energy resource in the transition to a
low carbon future. To achieve Moray
Council’s commitment to be Carbon
Neutral by 2030 and enable the energy
transition, the Council has engaged
Mott MacDonald to develop a strategy
for Hydrogen, including opportunities
for the transition of Council owned
buildings and the transport fleet. 
Highlands and Islands Enterprise (HIE)
also sought for the strategy to include
information on the decarbonisation
of Moray’s distilling industry and
other key hydrogen projects; and the
associated infrastructure requirements
to produce, store and supply hydrogen.
Developing a Hydrogen economy in
Moray during the short to medium
term, including connecting into
adjacent areas, could contribute to
a reduction in greenhouse gases
and particulate emissions, improve
security of energy supply, contribute
towards the decarbonisation of
transport, increase and make better
use of renewable energy generation,
and could help address fuel poverty
issues, particularly in rural areas.
Moray Council and HIE wants to
create a Hydrogen economy to
achieve the benefits by developing a
Hydrogen Strategy and Action Plan
which explores the use of green
Hydrogen to help achieve this. The
Council recognises that Hydrogen
could have a key role in providing an
alternative energy to fossil fuels.
The challenge is to understand the
market context within Moray to develop
short-, medium- and long-term hydrogen
demand profiles which can then be
used to determine the viability of
hydrogen generation and storage.
2045
Moray to transitionto net zero
Page 50

Page 51

4  I  Mott MacDonald  I  Confidential | Moray Hydrogen Strategy Report DRAFT
Developing a hydrogen economy to
meet the Scottish Government’s and
Moray Council’s net zero target of
2045 and the Council’s 2030 carbon
neutral target will require the parallel
growth of supply and demand. The
Hydrogen Strategy for Moray sets out
how the supply for hydrogen can be
increased over time to meet the
increasing local demand for hydrogen
from industrial users, transport, hospitals,
and public sector organisations
as well as local communities.
Moray has access to significant sources
of green renewable power including
offshore and onshore wind farms
which, subject to contract, could create
the conditions required to produce
green hydrogen within Moray at scale.
To deliver a hydrogen economy the
following key steps are proposed:
• Create a hydrogen steering group
within Moray to drive the development
of hydrogen opportunities, stimulating
both supply and demand. This group
could be led by Moray council and
include key stakeholders from the
industrial base and wider community.
• Start to generate hydrogen within
Moray to generate demand. Small
scale pilot projects are proposed
to include combined hydrogen
generators, storage and refuelling
at a single site. The potential sites to
be developed include Lossiemouth,
Aberlour, Buckie Harbour and Elgin.
The target users for the hydrogen in
the first instance would be the “back
to base” and transport fleets such
as local buses and refuse trucks.
• Expand the hydrogen generation
facilities to further stimulate the
demand from road freight transport
and form the industrial users such as
the distilleries. Hydrogen can start to
be distributed by road tanker from the
generator to the end user. A network
of hydrogen refuelling stations can be
developed, further stimulating demand
from the road freight transport users.
• In the long term, the hydrogen
economy for Moray could be based
on generating hydrogen from green
electricity sources within Moray,
purchasing hydrogen from outside
the area, and distributing hydrogen
through the area through a pipeline
network. The demand for hydrogen
would come from a wider range of
sectors including the distilleries, the
road haulage industry, council services
and to heat homes and businesses.
The development of a hydrogen
economy within Moray will bring
many benefits to the region including
inward investment, creation of new
opportunities and jobs, retention and
development of young persons in Moray.
Inward investment in the hydrogen
supply, demand and infrastructure
within Moray offers a sustainable
economic growth opportunity with a
positive impact on reducing poverty.
2030
Moray Councils carbon
neutral target
Page 51

Page 52

1. Introduction
Moray is an ideal location to establish a hydrogen
economy with direct access to existing and future
large scale renewable energy sources, including
onshore and offshore wind power, and reliable water
sources, providing the essential resources required
for green hydrogen production. Moray Council has
set an ambitious commitment to become Carbon
Neutral by 2030 and take a leading role to assist in
the Scottish Government's target of a 75% reduction
in regional emissions by 2030 and net zero emis-
sions by 2045.
Page 52

Page 53

6  I  Mott MacDonald  | Moray Hydrogen Strategy Report
Hydrogen provides a sustainable
alternative to burning fossil fuels and
its contribution to helping Scotland
reach its net zero targets for industry,
transport, power and heat is recognised
by the Scottish Government. Hydrogen,
produced from renewable energy
sources, is a zero carbon, zero emission
fuel that can be used for heavy duty
vehicles including buses, trucks,
agricultural vehicles, marine vessels
and trains, and also used to provide
heat for industrial uses and for homes.
In addition to hydrogen, it is recognised
that a significant amount of energy
will also be needed from other low
carbon sources including electricity.
The Moray Hydrogen Strategy examines
the short, medium, and long-term
actions required to develop a hydrogen
economy for Moray and assesses the
significant opportunities to generate
local community benefits in relation to
social, economic, and environmental
wellbeing, supporting Scotland’s
ambitions on a Just Transition1. A key
objective for the Council is to retain the
benefits of hydrogen energy investment
for the people and communities of
Moray and help to realise the Council’s
vison for the region to provide “a life of
opportunity for all, where people can
thrive in vibrant communities, and where
we work together to enrich our future.”
A life of opportunity
for all, where
people can thrive in
vibrant communities,
and where we
work together to
enrich our future.
Page 53

Page 54

7  I  Mott MacDonald  I  Confidential | Moray Hydrogen Strategy Report DRAFT Moray Hydrogen Strategy Report DRAFT  I  Confidential | Mott MacDonald | 7
Our vision is for Scotland to become
a leading Hydrogen Nation in the
production of reliable, competitive,
sustainable hydrogen and secure
Scotland’s future as a centre for
international excellence as we establish
the innovation skills and supply chain
that will underpin our energy transition.
Scotland’s unique selling points, are its
natural resources, infrastructure and
skilled energy workforce which enable
us to become the producer of lowest
cost hydrogen in Europe by 2045.
The Scottish Government Hydrogen Policy Statement,
published December 2020, sets out Scottish Government
support for the strategic growth of a strong hydrogen economy
in Scotland. The Minister for Energy, Connectivity, and the
Islands provides the following vison in the ministerial forward:
1 Just transition - Climate change - gov.scot (www.gov.scot)
Page 54

Page 55

8  I  Mott MacDonald  I  Confidential | Moray Hydrogen Strategy Report DRAFT
Hydrogen has a role to play across
Scotland in our islands and rural
communities, cities and industrial
clusters, and strategies for its
production and application are
expected to vary across these
geographic regions. We are committed
to realising the benefits of hydrogen
to our regions and local communities
and so will support regional hubs of
hydrogen activity across Scotland,
recognising the differing resources,
strengths and focuses of each location.
The Scottish Government Draft Hydrogen Action Plan,
published November 2021, sets out the actions for the next five
years to support the development of a hydrogen economy. The
Cabinet Secretary for Net Zero, Energy and Transport includes
the following statement as part of the ministerial forward:
Page 55

Page 56

9  I  Mott MacDonald  I  Confidential | Moray Hydrogen Strategy Report DRAFT Moray Hydrogen Strategy Report DRAFT  I  Confidential | Mott MacDonald | 9
2. Stakeholder
Engagement
Moray Council has a commitment to become
Carbon Neutral by 2030 and will take the leading
role to provide the necessary leadership to
local business and communities to assist in the
Moray wide transition to net zero by 2045. 
Page 56

Page 57

10  I  Mott MacDonald  | Moray Hydrogen Strategy Report
2.1 Introduction and Approach
It is therefore essential that Moray
Council can develop an achievable route
map to net-zero. Key to delivering this
is appropriate levels of engagement
with partners and stakeholders to
ensure that the strategies taken
forward are relevant and tailored to
suit Moray and its decarbonisation
aims. Critically, it needs to have the
buy-in of all partners, stakeholders,
local business and the community.
Our approach to building partnership
around hydrogen was to hold initial
meetings with Moray Council and
Highlands and Islands Enterprise
(HIE) to identify and map all
stakeholders that might have an
interest in the development of or
the outcome of the strategy.
We then approached each of
the identified stakeholders with
the aim to obtain the following
information that would inform
further elements of the strategy:
• Their current energy consumption
records (ideally from 2019) and
where possible split by source
(i.e. gas, electricity etc.) with a
monthly breakdown and details
on number and size of buildings
and/or number of vehicles.
• Their current net-zero plans.
• Their views on hydrogen as
potential energy source.
Due to the timescales of the project,
we carried out one-to-one sessions
for the majority of stakeholders
that we could engage with. During
the sessions, we sought to discuss
and develop the potential direction
of the project and how it might be
optimised with key stakeholder input.
The engagement with stakeholders
generated significant input that informed
the Demand Analysis and follow-on
sections of this report. The level of
positive response indicates a desire
from large and small businesses as well
as community groups within Moray to
support activity that will contributing
to achieving the net-zero target. It also
highlighted the opportunities to be
realised through the development of
a hydrogen economy within Moray.
In addition to the one-to-one sessions,
we presented to the Moray Climate
Assembly (with thanks to tsiMoray
for organising). Our presentation
provided an overview on Hydrogen
as well as a focus on the hydrogen
opportunities for Moray.
Page 57

Page 58

11  I  Mott MacDonald  | Moray Hydrogen Strategy Report
Figure 2.1: Stakeholder Engagement - Summary by Organisation Type
Source: MM
2.3 Key Outcomes from Stakeholder Engagement process
2.2 Stakeholders Engaged
Working with Moray Council and HIE,
we identified over 70 stakeholders
located within Moray or adjacent to
Moray. Figure 2.1 below provides a
summary of stakeholders engaged
by organisation type.
• A significant number of stakeholders
would like to be involved in the
next steps and to assist Moray
Council in developing a Hydrogen
Economy for the benefit of Moray.
• There will be a number of
challenges to take this forward. A
collaborative approach is required
to take forward and maximise
this opportunity for Moray.
• There is a desire within Moray
for smaller-scale community-led
hydrogen initiatives to be explored in
parallel to the large-scale projects.
We summarise below the key outcomes
of the stakeholder engagement process.
• Most stakeholders engaged were
very positive. It was felt that Hydrogen
(in particular Green Hydrogen) can
form part of the solution to achieve
net-zero and the time to act is now.
• There are several supply opportunities
available within or very close to
Moray. There is a future demand
that would be available should a
hydrogen supply be available.
A copy of the Stakeholder
Engagement Tracker is contained
in Appendix A. This details each
stakeholder that was contacted as
part of the engagement process.
Follow-up sessions were also held with
several stakeholders to further discuss
specific pilot project opportunities as
well as to further inform the roadmap
to net-zero.
Page 58

Page 59

12  I  Mott MacDonald  I  Confidential | Moray Hydrogen Strategy Report DRAFT
3. Hydrogen Demand
This section of the report details the Hydrogen
Demand Study for the Moray Council area
which has been conducted with the aim of
determining a hydrogen demand forecast
to inform the overall Hydrogen Strategy.
Page 59

Page 60

13  I  Mott MacDonald  | Moray Hydrogen Strategy Report
Key stakeholders representing
business interests in Moray have been
consulted to develop an understanding
of the market interest and potential
take-up rates for hydrogen. Public
sector partners including Moray
Council, the Highlands and Islands
Enterprise, and other bodies such as
NHS Scotland and the emergency
services have also been engaged to
identify opportunities for upgrading
transport fleets and heating systems.
For the purpose of the demand
study, we have utilised our existing
relationships with Scottish Gas and
other relevant stakeholders to assess
the overall energy demand for the
existing gas network with the Moray
area. We have also approached the
large oil and gas consumers within
Moray, including the Distilleries, to
obtain detailed consumption data to
inform our analysis. To allow a complete
picture of energy use in Moray to be
built up, we have strived to ensure
that this includes all energy users:
the industrial and domestic gas users
and the off-grid oil and gas users. For
each of the industries where actual
data has not been readily available,
we have aimed to substitute this with
assumptions based on our in-house
expertise and publicly available data.
Further details on the stakeholders
engaged as part of the Hydrogen
Strategy are detailed in Section 2
of this report.
Further to this, we have used a desk-
based study to assess the wider
supply and demand for hydrogen
within Moray and the adjacent local
authorities, as part of a potential
hydrogen corridor through Moray.
Within this section of the strategy report,
we will present our hydrogen demand
forecast in narrative and tabular form
along with maps of the Moray area to
illustrate the main locations for hydrogen
demand. We will also identify and map
short, medium, and long-term hydrogen
demand scenarios using a variety of
defined, sector dependant, hydrogen
uptake scenarios to provide input
into the overall hydrogen strategy.
In summary, the largest potential users
for hydrogen are the distilleries and
domestic properties in the medium
to long term, however in the short-
term expected demand is from road
freight trials including HGVs, buses,
refuse vehicles and other council
vehicles and grid blending make up
the majority of the total projections.
Page 60

Page 61

14  I  Mott MacDonald  | Moray Hydrogen Strategy Report 
3.1 Data
3.1.1 Baseline
This section summarises the
sources used in estimating existing
demand across various sectors
within the Moray Council region.
3.1.1.1 Domestic Demand
Domestic (Natural Gas)
Domestic gas use has been based on
publicly available Middle Super Output
Area (MSOA) gas consumption data
for domestic properties published
by the Office for National Statistics
(ONS). For our analysis we have
used data from 2019 and 2020
to estimate current demand.
Domestic (Other)
The Scottish House Condition Survey
(SHCS), last reported in 2019, states
that 27% of dwellings in the Moray
Council area are off the natural gas grid.
This is relatively high in comparison
with the national average of 17% but
coincides with the largely rural location
of Moray. We have used this figure,
alongside the domestic gas data noted
above to infer the demand for off-gas
grid properties. At this stage there is
insufficient data available to estimate
the proportion of properties which
use oil, LPG, electric heating etc.
Figure 3.1: Distribution of distillery demand across the Moray Council region
Other Manufacturing
We have also obtained consumption
data from some other manufacturing
sites which are on the natural gas
network, including Johnston’s of
Elgin and Walker’s Shortbread sites
in Elgin and Aberlour. Together
these account for approximately
1% of total current demand.
3.1.1.3 Non-Domestic Off Gas Grid
Distilleries
As noted above, using a combination
of data obtained during stakeholder
engagement discussions and energy
benchmarks for whisky distilleries
to estimate consumption based on
production in litres of pure alcohol
(lpa), we have developed an estimate
of the total demand for distilleries in
the Moray area. In total there are over
50 distilleries in the Moray Council
region and they account for over 45%
of total baseline fossil fuel demand.
3.1.1.2 Non-Domestic Natural Gas
The ONS also publishes MSOA gas
consumption data for non-domestic
gas consumption, which we have
used to establish the existing natural
gas demand for the Moray Council
area for non-domestic properties.
Alongside this, we have obtained
actual and estimated consumption
for a range of end users, many of
whom will be on the gas network.
Public Buildings
For public buildings we have obtained
gas and oil consumption data for
buildings owned and operated by
NHS Grampian, Moray Council, Police
Scotland and Scottish Fire & Rescue.
Combined, these buildings account for
approximately 1% of overall total fossil
fuel demand in the Moray region.
Distilleries
Using a combination of data obtained
during stakeholder engagement
discussions and energy benchmarks
for whisky distilleries to estimate
consumption based on production
in litres pure alcohol (lpa), we have
developed an estimate of the total
demand for distilleries in the Moray
area. In total there are over 50
distilleries in the Moray Council region,
and they account for over 45% of
total baseline fossil fuel demand. 
Analysis of existing gas infrastructure
suggests that approximately 76% of
distillery thermal demand is met by
natural gas, with the remainder using
fuel oil. The below Figure 3.1 shows
the distribution of distillery demand
across the Moray Council region.
Analysis of existing gas infrastructure
suggests that approximately
24% of distillery thermal
demand is met by fuel oil.  
Other off-gas grid Non-Domestic Users
Off gas grid non- domestic users are
difficult to estimate without supply
information with providers of fuel oil
and LPG. As part of this project, it
has not been possible to obtain this
information, so we have used other
data to estimate off gas grid demand.
Scottish Government estimate that
5% of non-domestic properties are
heated by oil & LPG and so this figure
has been used to provide an initial
estimate of potential demand.
Page 61

Page 62

15  I  Mott MacDonald  | Moray Hydrogen Strategy Report
3.1.1.4 Transportation
Heavy Goods Vehicles (HGVs)
Transport Scotland data was used to
quantify the number of HGVs on the
main trunk road, the A96 over the course
of a year. This suggests that there are
approximately one million HGV journeys
along the A96 in Moray each year.
This data has been used to estimate
the approximate amount of diesel
currently consumed by HGVs in the
Moray region, and what the equivalent
quantity of hydrogen would be.
Public Service Vehicles (PSVs)
For PSVs, Transport Scotland data for
the number of kilometres travelled was
obtained and an appropriate share of
this figure was allocated to the Moray
Council region based on the number of
buses registered there. This figure was
used to estimate the quantity of diesel
currently consumed by PSVs in the
Moray region, and what the equivalent
quantity of hydrogen would be.
Light Goods Vehicles (LGVs)
The total number of LGVs registered
in Moray, combined with the average
miles travelled per year for this class
of vehicle was used to estimate
demand. This figure was used to
estimate the quantity of diesel
currently consumed by LGVs in the
Moray region, and what the equivalent
quantity of hydrogen would be.
Maritime
Current maritime demand was
calculated using an estimated
hydrogen demand for each vessel
registered at Buckie, to arrive at a
theoretical total hydrogen demand. 
Rail
Rail demand was estimated based on
the theoretical transition of all ScotRail
services on the Inverness to Aberdeen
line being converted to hydrogen. 
3.1.1.5 Baseline Demand Summary
In developing our baseline estimate, we
have attempted to quantify the current
total demand for fossil fuels across
relevant sectors using available data to
establish what the equivalent hydrogen
demand would be if all this demand
was to switch to hydrogen fuel. This
baseline was then used to inform an
analysis of the proportion of this demand
which could realistically be expected to
transition to hydrogen over the short,
medium and long term as outlined below.
This approach quantified an annual
fossil fuel demand of approximately
2.6 million MWh per year, which would
translate to a hydrogen demand of
approximately 80,000 tonnes of
hydrogen per year. The breakdown
of this demand by sector is shown in
Figure 3.2 and Figure 3.3 on the right. 
As can be seen from the charts, demand
is dominated by distilleries (both on
and off gas grid), on gas grid domestic
and HGVs, together accounting for
over 75% of total theoretical demand.
Figure 3.2: Theoretical Tonnes of Hydrogen by Sector
Figure 3.3: Breakdown of Potential Hydrogen Demand by Sector Page 62

Page 63

16  I  Mott MacDonald  | Moray Hydrogen Strategy Report
The below Table 3.1 sets out our various demand scenarios as
percentages of the theoretical total hydrogen demand, and the chart
below (Figure 3.4) shows the output of this in terms of total annual
demand for hydrogen over the short, medium and long term.
Figure 3.4: Annual Hydrogen Demand Projections
As outlined both in the right figure, medium demand rises from ~11,000
tonnes of hydrogen per annum in the short term, up to ~54,000 tonnes
in the longer term, post 2040. A commentary on the basis of the
assumptions which make up the above estimates is stated below.
Sector Short Term,
High Demand
Short Term,
Medium Demand
Short Term,
Low Demand
Domestic (gas) 0% 0% 0%
Domestic (other) 0% 0% 0%
Public Buildings 0% 0% 0%
Distilleries (Gas) 10% 5% 0%
Distilleries (Oil) 20% 10% 0%
Other Manufacturing 0% 0% 0%
Other ND Natural Gas 0% 0% 0%
Other ND Off Gas Grid 20% 10% 0%
HGVs 30% 20% 10%
PSVs 15% 10% 5%
LGVs 10% 5% 0%
Maritime 10% 5% 0%
Rail 0% 0% 0%
Blend 100% 50% 0%
TOTAL 23% 12% 1%
Table 3.1: Various Demand Scenarios
3.1.2 Uptake Scenarios 
Having set the theoretical demand across the sectors noted above, we
have then made an estimation of the potential uptake over the short
medium and long term. We have presented these uptake levels below
as percentages of the theoretical maximum. For the purposes of this
analysis, we have defined short, medium, and long term as follows:
• Short-term: up to 2030
• Medium-term: 2030 – 2040
• Long-term: 2040 and beyond
Medium Term,
high Demand
Medium Term,
Medium Demand
Medium Term,
Low Demand
90% 80% 50%
5% 3% 0%
70% 60% 50%
80% 70% 60%
40% 30% 20%
100% 80% 60%
70% 60% 50%
30% 15% 0%
50% 40% 30%
25% 20% 15%
10% 5% 0%
0% 0% 0%
0% 0% 0%
0% 0% 0%
63% 54% 41%
Long Term,
High Demand
Long Term,
Medium Demand
Long Term,
Low Demand
90% 80% 50%
10% 5% 0%
70% 60% 50%
80% 70% 60%
80% 60% 40%
100% 80% 60%
70% 60% 50%
40% 20% 0%
100% 80% 60%
50% 40% 30%
20% 10% 0%
0% 0% 0%
0% 0% 0%
0% 0% 0%
75% 63% 47%
Page 63

Page 64

17  I Mott MacDonald  | Moray Hydrogen Strategy Report 
3.1.3 Future Demand Assumptions
This section explains the future
demand assumptions and the basis
on which they are calculated.
3.1.3.1 Domestic Demand
Short Term
In the short term, pre- 2030, it is
assumed that there will be no domestic
hydrogen demand. This is for two
reasons. The UK Government’s plan
for hydrogen involves the delivery
of a village trial by the mid-2020s to
inform the policy decision on the grid
conversion to hydrogen. If the decision
to switch to hydrogen is taken, then
conversion of the grid network is unlikely
to commence before 2030 and therefore
we have assumed there will be no
domestic demand from those premises
on the gas network in the short term.
With regards to off-gas grid properties,
it is in theory possible that there
could be some domestic demand for
road supply before 2030, however
this is thought to be unlikely in these
timescales, and if there were to be
any users before 2030 it is likely that
they would only be a small quantity.
Medium to Long Term
In the medium to long term, on gas
grid domestic demand could increase
significantly if there was to be conversion
of the gas grid to hydrogen. In the event
that this were to happen then hydrogen
could be made available to all homes on
the gas grid in a relatively short period of
time. It is difficult at this stage to gauge
what level of uptake there may be from
domestic consumers as the situation
is relatively unprecedented (retaining
the status quo would not be an option).
However, we have presented three
plausible scenarios of 50%, 80% and
90% uptake by domestic consumers
for both the medium and long term.
The reason for projecting the same
estimate for both is that conversion,
were it to happen, may well do so in the
medium term and it appears unlikely
that there would be significant additional
uptake following conversion (unless the
gas network was to be expanded).
For off gas grid properties, any uptake
would depend on the development
of a bulk hydrogen supply chain. At
present, nationally, it is estimated
that approximately 10% of homes
are heated by oil & LPG so it seems
reasonable that this would be the
maximum that could in theory convert
to hydrogen. In light of this, we have
modelled the below scenarios:
• Medium Term: 0%, 3% and 5%
• Long Term: 0%, 5% and 10%
This is based on the hypothesis that off
gas grid demand may develop more
gradually than on gas grid over time.
3.1.3.2 Non-Domestic Natural Gas
Public Buildings
Similar to the situation with domestic
properties, we do not expect there to
be any hydrogen demand specifically
for this area in the short term, for the
reasons set out above. However, in
the medium to long term we anticipate
demand could be in the range of 50%
- 70% of the theoretical maximum.
The upper estimate is slightly lower
than for domestic properties as it
may be that organisational targets
in the public sector may drive some
operators to switch to low carbon
heat solutions such as heat pumps
before hydrogen becomes available.
Distilleries
Distilleries use large quantities of
fossil fuels for the production of steam,
which is required for their production
process. The majority of distilleries in
the Moray region have mains natural
gas supplies. Distilleries are well
engaged in the journey to net zero. In
the medium to long term when hydrogen
may be available via the existing gas
network demand could be high, due
to the challenging nature of steam
production by other means. This is
reflected in the estimates set out below:
• Short Term: 0%, 10% and 20%
• Medium Term: 60%, 70% and 80%
• Long Term: 60%, 70% and 80%
If the gas network were to be converted
then it is possible that up to 80%
of distilleries may take advantage
of hydrogen supply, as it may well
represent the most viable option
for them to achieve net zero. This
is reflected in our upper estimates
in the medium to long term. 
The biggest barrier to deployment of
hydrogen in on gas grid distilleries
is likely to be the timescales for the
development of a hydrogen supply chain.
Some distillers, such as Diageo (which
accounts for ~20% of total demand in
Moray), have 2030 Net Zero targets
and have already developed route-
maps for their distilleries which assume
hydrogen will not be available. Whilst
they would be interested if hydrogen
supply were to become available, they
are not considering switching any
distilleries to 100% hydrogen fuel. 
80%
of distilleries may take
advantage of hydrogen supply
Page 64

Page 65

3.1.3.3 Non-Domestic Off Gas Grid
Distilleries
As noted above, the production of steam
is essential for distilleries and those that
are not connected to the natural gas
grid typically use fuel oils, though some
do use biomass and biogas to meet a
proportion of steam demand. Given the
requirement for high temperatures in
the distilling process, hydrogen could
be an attractive option even for off-gas
grid facilities as it may allow the boiler
to be converted to hydrogen with no
other changes required to the process. 
• Short Term: 0%, 10% and 20%
• Medium Term: 20%, 30% and 40%
• Long Term: 40%, 60% and 80%
If bulk hydrogen supplies were to
become available then supply to
distilleries could grow from low
levels in the short term to a high
proportion of distilleries in the medium
to long term, if hydrogen offers the
best route to decarbonisation. 
3.1.3.4 Transportation
Heavy Goods Vehicles (HGVs)
For HGVs, it is likely that hydrogen,
rather than electrification will be the
preferred option for decarbonisation in
the future, and the question is to what
extent this will be the case and how
quickly the transition will happen. The UK
government have recently committed to
phasing out diesel HGVs by 2040 and
so the trajectory towards this should
become clear in the coming years.
• Short Term: 10%, 20% and 30%
• Medium Term: 30%, 40% and 50%
• Long Term: 60%, 80% and 100%
The above scenarios are plausible
projections of what proportion of total
HGV demand could be met by hydrogen
in the short, medium and long term. 
Other off-gas grid Non-Domestic Users
For other off-gas grid non- domestic
consumers, it is likely that uptake will
be relatively low, as summarised in the
figures below. For lower temperature
uses such as space heating or low
temperature process requirements,
heat pumps are likely to be the
preferred option for many consumers.
• Short Term: 0%, 10% and 20%
• Medium Term: 0%, 15% and 30%
• Long Term: 0%, 20% and 40%
The above figures present plausible
scenarios for the use of hydrogen
on off-gas grid facilities from zero up
to potentially 40% of the theoretical
maximum in the long term.
2040
the government are committed
to phasing out diesel HGVs
Page 65

Page 66

Figure 3.5: Breakdown of Scenarios by Sector
As can be seen in Figure 3.5 above
the largest potential contributors are
distilleries and domestic properties
in the medium to long term, however
in the short- term demand from
HGVs and grid blending make up the
majority of the total projections.
Light Goods Vehicles (LGVs)
For LGVs, it is likely that electrification
will dominate the drive towards
decarbonisation. However, it may be that
there will be some demand for hydrogen
from larger vehicles. The following high-
level estimates were made for this sector.
• Short Term: 0%, 5% and 10%
• Medium Term: 0%, 5% and 10%
• Long Term: 0%, 10% and 20%
3.1.3.5 Summary
In summary, there are a range of
potential outcomes with regards to
hydrogen demand in the future. Of the
total theoretical hydrogen demand
of just under 80,000 tonnes per year
we project the following scenarios: 
• Short Term: 1%, 12% and 23%
• Medium Term: 41%, 54% and 63%
• Long Term: 47%, 63% and 75%
Figure 3.5 below shows the breakdown
of these scenarios by sector. 
Public Service Vehicles (PSVs)
For PSVs, the picture is similar. It
is likely that hydrogen, rather than
electrification will be the preferred
option for decarbonisation for larger
buses, and the question is to what
extent this will be the case and how
quickly the transition will happen.
We have estimated the following.
• Short Term: 5%, 10% and 15%
• Medium Term: 15%, 20% and 25%
• Long Term: 30%, 40% and 50%
The above scenarios are plausible
projections of what proportion of total
PSVs demand could be met by hydrogen
in the short, medium and long term.
This is lower than for HGVs as there
is a higher likelihood of electrification
playing a larger role in this sector.
Page 66

Page 67

20  I  Mott MacDonald  I  Confidential | Moray Hydrogen Strategy Report DRAFT
4. Renewable Energy
The current and planned renewable energy sources
within Moray could be used to provide green
power to potential hydrogen generation facilities
and support the development of a hydrogen
economy. The renewable energy in Moray is
generated by onshore and offshore wind farms
and land based solar farms. The grid electrical
power can also be used to provide power to
hydrogen generation facilities utilising electricity
from green sources and higher carbon sources.
Page 67

Page 68

21  I  Mott MacDonald  | Moray Hydrogen Strategy Report
Figure 4.1: Energy supply sources in Moray
4.1 Onshore wind
Operational onshore windfarms of installed capacity greater than 5 MW have
been included in light blue in the map on Figure 4.1. These are also listed in Table
4.1 below. Lurg Hill is the only site in this list that has not yet been commissioned,
but we understand that operations are expected to begin in 2024.
Several of the identified windfarms have applied for extensions to be made
on-site, meaning that spare generating capacity may be available from these
locations at a given year. This information is recorded in Table 4.1 below.
From this list, the larger onshore wind farms tend to be located towards the
north-eastern boundaries of the Cairngorms. Windfarms towards Moray’s eastern
boundary tend to be smaller in size given the likely additional land constraints.
Name Developer MW Future
MW
Future MW
Year
Berry Burn (Carn Kitty)
Windfarm Statkraft 67 105 2025
Paul's Hill Windfarm  AWG and Balfour Kilpatrick  65 88 2023
Hill of Towie (Drummuir) RES 42 90 2024
Edintore Wind Farm  Vento Ludens  18 - -
Hill of Glaschye Muirden Energy  28 - -
Rothes I & II Wind Farm  Fred Olsen Renewables  92 - -
Lurg Hill Vento Ludens  - 15 2024
Netherton of Windyhills  Strathdee Energy  5 - -
Dorenell Windfarm EDF renewables and Infinergy  177 - -
Table 4.1: Onshore wind farms in Moray
greater than 5 MW in capacity
The renewable energy and grid connection options are illustrated
in Figure 4.1: Energy supply sources in Moray, wherein the size
of the bubble represents the total installed capacity:
• Light blue represents operational onshore wind installations.
• Dark blue represents the onshore substations associated with
the operational and proposed offshore windfarms.
• Green represents 33 / 11 kV grid connected substations
with over 10 MW demand headroom.
• Yellow represents operational solar farms.
• Red highlights towns in Moray for reference.
The options are further detailed in the subsections of this chapter.
2025
Moray forecast to have over
600MW of onshore wind capacity
Page 68

Page 69

22  I  Mott MacDonald  | Moray Hydrogen Strategy Report
4.2 Offshore wind
Four offshore windfarms have been identified, as detailed in Table 4.2.
Of these, two of the corresponding onshore substations are being built
within Moray’s geographical boundaries: Moray East and Moray West.
These onshore substations are identifiable in dark blue within Figure 4.1.
Operations commenced in 2021 at Moray East windfarm and commencement
of operations for Moray West windfarm is expected in 2024.
Name Developer MW Future
MW
Future
MW Year Latitude Longitude
Moray East Ocean Winds - 950 2022 57.4917866 -2.2839007
Moray West  EDP renewables
and ENGIE  - 850 2024 57.5055678 -2.9253252
Beatrice  SSE
Renewables  588 - - 57.5225943 -2.9477369
Caledonia Ocean Wind - 1000 2028 - -
In addition, the Crown Estate have issued option agreements through ScotWind
Leasing which will lead to the development of 17 offshore wind projects, further
enhancing the opportunities for utilising green electricity within Moray and Scotland.
Beatrice offshore windfarm is already operational, with power supplied to the
grid at its onshore substation, New Deer, located 20 km into Aberdeenshire.
4.3 Solar
Three solar PV systems have been identified in Moray with over 5 MW of
installed capacity, as detailed in Table 4.3.  Elgin Energy has secured planning
to proceed with the 20 MW and 50 MW projects near Urquhart and the Milltown
Airfield respectively. All three solar plants are visible in Figure 4.1. in yellow.
Name Developer MW Future 
MW
Future
MW Year Latitude Longitude
Urquhart Solar
Power Project 
Elgin
Energy  - 20 2025 57.648285 -3.1984769
Solar PV Milltown
Airfield 
Elgin
Energy  - 50 2025 57.675252 -3.2324848
RAF Lossiemouth MoD - tbc 2024 57.710353 -3.3079101
Table 4.2: Offshore wind farms in the Moray Firth
4.4 National Grid Supply
Demand headroom is a measure of spare capacity at the substation and is calculated
by subtracting the maximum load recorded in the previous year from the substation’s
installed capacity. The greater the demand headroom, the greater the amount
of power that can be drawn from the network. Substations in Moray with over 8
MW demand headroom are visible in green in Figure 4.1 (above) and detailed in
Table 4.4 below.  Note that the Nairn GSP is not actually located within Moray. 
Name Developer Headroom (MW) Voltage (kV)
Lossiemouth SSEN 8 33 / 11
Ballindalloch SSEN 12 33 / 11
Kinloss SSEN 12 33 / 11
Buckie SSEN 13 33 / 11
Bilbohall SSEN 19 33 / 11
Nairn GSP SSEN 29 132 / 33
Keith GSP SSEN 40 132 / 33
Elgin GSP SSEN 42 132 / 33
Table 4.3: Solar PV systems in Moray greater than 5 MW in capacity
Table 4.4: 33/11 kV substations in Moray at least 8 MW headroom
Page 69

Page 70

23  I  Mott MacDonald  | Moray Hydrogen Strategy Report
4.5 Energy Supply for Hydrogen
The actual capacity of the electricity generator to produce electricity depends
on the number of hours the generator is in operation. The capacity factor of the
generator is a measure of the total electricity generated compared with the number
of hours. For renewable energy sources, the capacity depends on the availability
of wind and the amount of sun. The grid supply in contrast is almost continuous.
For Moray the assumed capacity factors are as follow:
• Offshore Wind: 50%
• Onshore Wind: 30%
• Solar: 25%
• Grid Electricity: 100%
Figure 4.2: Electrolyser capacity factor given VRE supply
Source: Mott MacDonald
Page 70

Page 71

24  I  Mott MacDonald  I  Confidential | Moray Hydrogen Strategy Report DRAFT
5. Hydrogen Production
Hydrogen can be produced in Moray from
the electrolysis of water, utilising green
electricity or grid electricity. Green electricity
is provided from wind and solar sources within
Moray or offshore within the Moray Firth.
Page 71

Page 72

25  I  Mott MacDonald  | Moray Hydrogen Strategy Report
5.1 Introduction
For the Moray Hydrogen Strategy,
the following factors have been
considered for hydrogen production:
• Electrolyser technology selection
• Utilities (water supply, power supply)
• Hydrogen storage requirements
(bulk vs local)
• Hydrogen distribution method
(via tube trailer and/or pipeline)
• Hydrogen re-fuelling stations
• Hydrogen storage requirements
(bulk vs local).
5.2 Electrolyser Technology
Hydrogen is produced via electrolysis
by passing electricity through two
electrodes in water. The water molecule
is split and produces oxygen at the
anode and hydrogen at the cathode.
Regardless of the technology, the overall
electrolysis reaction is the same:
H2O → ½ O2 + H2
Electrolysis is a well-established green
technology for hydrogen generation;
thus, it has been selected as the
hydrogen production technology for the
potential generation of hydrogen within
Moray. A general flow diagram showing
major equipment items to produce
hydrogen via electrolysis is shown below.
Variations in this process
exist for the different types of
electrolyser technologies.
Electrolysers are differentiated
by the electrolyte materials used
and the temperature at which they
are operated. There are several
electrolyser technologies, these are:
• Alkaline (ALK)
• Proton Exchange Membrane (PEM)
• Solid Oxide (SO)
• Anion Exchange Membrane (AEM).
Anion Exchange Membrane (AEM)
electrolysis and Solid Oxide
Electrolysis (SOE) are still in the
demonstration phase; hence they
are currently not considered to be
a viable option for this project.
The two commercially available
electrolysis technologies available in
the marketplace today are Alkaline
Electrolysis (ALK), and Proton Exchange
Membrane (PEM) electrolysis. Historically,
alkaline electrolysis has dominated
the market and accounted for a large
proportion of the installed electrolysis
capacity worldwide. More recently there
have been a growing number of projects
based around PEM electrolysers.
These factors influence the potential
locations for hydrogen generation
within Moray. The following
locations have been considered:
• Offshore, adjacent to the wind turbines
• Onshore, adjacent to
renewable energy sources
• At a central location close
to the potential main users
of hydrogen in Moray
• At a central location aligned with the
existing electrical distribution network
(such as Blackhillock substation)
• At distributed locations on a small
scale located adjacent to key
users of hydrogen at point of use
(such as close to a Distillery)
• At a location outside Moray.
Page 72

Page 73

26  I  Mott MacDonald  | Moray Hydrogen Strategy Report 
5.2.1 Alkaline Electrolysis (ALK)
Alkaline Electrolysers employ an
aqueous solution of potassium hydroxide
(KOH), typically 30t% KOH because of its
high conductivity. Alkaline Electrolysers
have a simple stack and system design
and are relatively easy to manufacture.
These units can be either unipolar
or bipolar. The unipolar electrolyser
resembles a tank and has electrodes
connected in parallel. A membrane
is placed between the cathode and
Figure 5.1: Alkaline Electrolysers Cell.
Source: Mott MacDonald
anode, which separate the hydrogen
and oxygen as the gasses are produced
but allows the transfer of ions. The
bipolar design resembles a filter press.
Electrolysis cells are connected in
series, and hydrogen is produced on
one side of the cell, oxygen on the
other. Again, a membrane separates
the electrodes. The main reason for the
bipolar arrangement is the savings in
space. The main reason for the bipolar
arrangement is the savings in space. In an alkaline system the reaction
at each electrode is:
Alkaline Hydrogen Production
at the Cathode
2 H2O + 2e- → H2 + 2OH-
Alkaline Oxygen Production
at the Anode
2OH- → ½ O2 + 2 H2O + 2e-
Since liquid alkaline electrolytes
are less corrosive, the electrodes
can be made relatively cheap
metals such as Ni, Fe and Co.
Page 73

Page 74

27  I  Mott MacDonald  | Moray Hydrogen Strategy Report
Under a balanced pressure operation,
the anode and cathode are designed
to run at the same pressure level
of up to 30 bar. With atmospheric
pressure operation the electrolyser
operates near atmospheric pressure.
In the differential mode, a differential
pressure of up to 30 bar operates
across the stack. This, however, requires
a thicker membrane to improve the
mechanical stability and decreases gas
permeation, which reduces efficiency.
5.3 Electrolyser Technology
Evaluation
Due to their different designs Alkaline
and PEM electrolysers have advantages
and disadvantages, which have been
briefly outlined below. Although both
technologies can be applied to
applications in Moray, it is considered
that Alkaline electrolyser systems are
cheaper and more proven, so should be
the primary choice.
Figure 5.2: PEM Electrolysers Cell.
Source: Mott MacDonald
Table 5.1: Summary of the Advantages and Challenges of the Technologies
Alkaline Water Electrolysis PEM Water Electrolysis
Advantages
Well-established technology Smaller stack size
Large stacks available Fast dynamic response
Lower investment costs Good partial load tolerance
Slightly higher efficiency High pressure operation without compression
Slightly higher hydrogen purity
Disadvantages
Slightly lower hydrogen purity   Higher investment cost
Lower partial load tolerance Acidic corrosive environment
Slower dynamic response Shorter stack life
Low operational pressures   Smaller stacks
Corrosive liquid electrolyte
5.2.2 Proton Exchange
Membrane Electrolysis (PEM)
In Proton Exchange Membrane (PEM)
Electrolysers, the electrolyte is a solid
ion conducting membrane as opposed
to the aqueous solution in the alkaline
electrolysers. The membrane allows
the H+ ion to transfer from the anode
side of the membrane to the cathode
side, where it forms hydrogen. The
membrane also serves to separate
the hydrogen and oxygen gasses, as
oxygen is produced at the anode on one
side of the membrane and hydrogen
is produced on the opposite side of
the membrane. A commonly used PEM
material is Nafion. Developed in the
1970s by Dupont, Nafion consists of
polytetrafluoroethylene (PTFE) chains,
commonly known as Teflon forming the
backbone of the membrane. Attached to
the Teflon chains, are side chains ending
with sulphonic acid (HSO3) groups.
The PEM system reactions at the
electrodes are:
PEM Hydrogen Production
at the Cathode
2H+ + 2e- → H2
PEM Oxygen Production at the Anode
H2O → ½ O2 + 2H+ + 2e-
Since this design employs an acid
environment, the electrodes are typically
made from metal such as Pt, Ir and
Ru. These electrodes provide high
performance and reliability, but they are
expensive, and subject to price volatility,
for example the high cost of platinum.
PEM systems can be designed to
operate in a number of modes:
atmospheric, differential, and balanced
pressure (however the design
must be fixed to a single mode).
Page 74

Page 75

28  I  Mott MacDonald  | Moray Hydrogen Strategy Report
Figure 5.3: Hydrogen Production Facility
Source: Mott MacDonald
5.4.1 Electrolyser System
The transformer and rectifier are
required to convert the AC high
voltage supply into the DC current
required by the electrolyser.
Multiple electrolyser stacks
will be provided to supply the
required hydrogen production,
operational flexibility, and system
maintainability. The hydrogen gas
is generated at the cathode and
the oxygen gas at the anode.
The Alkaline electrolyser system
includes electrolyte management
as well as pressure management
systems for keeping the oxygen
and hydrogen sides equalized. The
pressures on the anode and cathode
sides of the cell must always be
equalized to prevent gas crossover
5.4 The Hydrogen Production Facility
The proposed hydrogen generation facilities selected for Moray include
the electrolyser, gas purification (oxygen and water removal), storage and
compression. A general flow diagram showing major equipment items
to produce hydrogen via electrolysis is shown in Figure 5.3. Variations in
this process exist for the different types of electrolyser technologies.
through the porous cell separator.
The Alkaline electrolyser uses a 30%
KOH solution as the electrolyte, the
electrolyte system includes the piping
and pumps to circulate the electrolyte
and an electrolyte storage tank.
Hydrogen and oxygen leaving the
electrolysers must be separated from
the electrolyte. This is done in gas-
electrolyte separators that are placed
above the stack. The gas leaves from
the top of the separator and electrolyte
from the bottom. A scrubber is also
provided after the hydrogen separator
to remove residual traces of electrolyte
from the hydrogen gas stream.
Heat is generated in the electrolyser
stacks, so the electrolyte is cooled
before it is returned to the electrolyser.
A suction drum is provided between
the scrubber and the compressor.
The compressor compresses the
near atmospheric pressure gas to the
500-bar buffer storage pressure.
After leaving the compressor any trace
amounts of oxygen can be removed by
catalytic reaction in a deoxidiser. A dryer
package which typically consists of twin
towers filled with a desiccant will also
be provided to absorb the remaining
water to achieve the desired dew point.
The system will comply with ISO
14687 and SAE Y2719, the standards
for hydrogen road vehicles. Both
of these require <5 ppm (by
volume) of oxygen and water.
Page 75

Page 76

29  I Mott MacDonald  | Moray Hydrogen Strategy Report
5.4.3 Power Supply
Electrical power for electrolysis will be
provided through cabling from either
renewable energy sources or directly
from the grid. The distance from the
power source to the electrolyser will
influence cabling costs and can impact
on the overall viability of a scheme.
The capacity factor of a power source
is the ratio of average power output
that can be delivered. The electrical
power available from renewable energy
sources is variable which is reflected in a
lower capacity factor. To compensate for
lower capacity factors from renewable
powers sources, electrolysers can be
oversized to produce more hydrogen
when power is available alongside
increased storage capacity.
The amount of potential grid power
available at a site is determined by
measuring the spare capacity at the
nearest substation, known as the
headroom. The greater the headroom
the greater the amount power that can
be drawn from the network. This is
considered when selecting potential
electrolyser sites with Moray. Alternative
sources of grid power could be made
available which will require significant
new infrastructure and investment.
5.4.2 Water Supply
The production and availability of
high-quality water for the electrolyser
is a critical step in the hydrogen
production process. Both Alkaline
and PEM electrolyser systems require
deionised water. Various water sources
can be used for example towns water,
seawater, river water, and brackish
groundwater. The design and cost of
the water treatment facility will depend
on the water source and water quality
required by the type of electrolyser.
Water for the potential hydrogen
production facilities for Moray will be
provided from the towns water mains
supply. It is assumed that there is
sufficient capacity of towns water to
supply to each of the locations selected.
River water from the River Lossie or
River Spey could provide an alternative
source of water although additional feed
water treatment may be required. The
water volume required for electrolysis
is small compared to other industrial
users such as the distilleries. However,
it is recognised that water levels in
the springs and rivers within Moray
and the Scottish Highlands can fall to
low levels during summer periods of
high temperatures with little rainfall.
Further analysis and engagement
with Scottish Water and the Scottish
Environment Protection Agency (SEPA)
will be required to confirm the water
sources, availability, and quality.
5.4.4 Hydrogen Transport
and Distribution
Hydrogen for pilot projects, transport
trials and small-scale industrial
applications is typically produced by
electrolysis at a facility that includes
hydrogen storage and refuelling systems.
An example is the hydrogen refuelling
system provided for the Aberdeen
hydrogen bus fleet. As the demand and
supply for hydrogen increases, siting a
higher capacity electrolyser at a central
location or hub with distribution of
hydrogen to multiple hydrogen refuelling
stations or industrial users is a potential
solution that could offer cost benefits.
This approach could be applied within
Moray in the medium and long term.
Hydrogen can be transported using the
following methods:
• Pipelines: For the delivery of
large amounts of hydrogen
• By road as cryogenic liquid:
Intermediate amounts of hydrogen
can be transported as a cryogenic
liquid in super-insulated tank trucks.
• By road as compressed gas: Smaller
amounts of hydrogen gas can be
compressed and transported over the
road in high pressure tube trailers. 
Page 76

Page 77

30  I  Mott MacDonald  | Moray Hydrogen Strategy Report
Tube trailers are competitive at short
delivery distances with small volumes.
The principal advantage of gaseous
tube trailer delivery is that it avoids
the high liquefaction energy cost or
pipeline investment costs and installation
times. Over long distances tube trailer
delivery costs become high. As well
as high operating costs, depending on
the volume of hydrogen transported,
investment costs may also be high due
to the number of tube trailers required.
In the long term, hydrogen may be
distributed through a local or national
pipeline network from centralised
industrial scale hydrogen production
sites. The network could be a new
pipeline system, or it could be developed
by repurposing the existing gas
distribution network (as natural gas
is withdrawn as an energy source).
Figure 5.4: Hydrogen Refuelling Station
Source: Mott MacDonald
5.6 Hydrogen Refuelling
Stations (HRS)
Hydrogen refuelling stations are
provided to dispense hydrogen for
transport use. The hydrogen supply
pressure for large vehicles such as
refuse trucks, buses, and HGV’s is
typically 350 bar, since larger vehicles
such as buses and trains tend to have
more available storage space, while
cars and smaller commercial vehicles
have adopted the 700-bar standard.
A HRS typically consists of the following
main components:
• MP hydrogen storage tank:
• Hydrogen HP gas compressors,
• High pressure hydrogen
storage tanks, and
• Hydrogen dispenser.
Hydrogen refuelling station equipment
is now widely available from many
suppliers within the UK and Europe for
hydrogen cars, busses, and HGVs.
Hydrogen refuelling stations can store
and dispense hydrogen in the form of
either liquid or gas. Refer Figure 5.4
for an example of main equipment
and process f or a typical gas HRS.
While liquid hydrogen can reduce
storage footprint requirements, it
requires an intensive cooling system
which can be more energy intensive
compared to hydrogen gas. For
Moray, hydrogen gas is proposed.
A hydrogen refuelling station that
can produce 1000 to 1125 Kg of
hydrogen a day is suitable for operating
approximately 30 HGVs per day.
1000kg
of hydrogen produced a day
at a refuelling station
5.5 Hydrogen Storage
The hydrogen storage capacity
and locations will need to be
considered as part of the overall
hydrogen strategy for Moray.
Bulk hydrogen storage is required at
the electrolyser and normally provides
between 1- and 5-days production
to allow for swings in demand and
production, and to allow for planned
or unplanned maintenance.
In addition, storage is required at the
hydrogen user’s site if there is no
connected pipeline. It is possible to
leave a tube trailer at the user’s site and
replace when empty. Alternatively, the
user can provide their own permanent
storage facilities. It is assumed that local
bulk hydrogen storage within Moray
will be as pressurised gas (separate
liquid hydrogen storage may be
required depending on identified liquid
hydrogen consumers). Further analysis
is required to optimise the medium- and
long-term storage solutions for Moray.
Page 77

Page 78

5.7 Electrolyser Sizes
To start an immediate road freight trial
in Moray to stimulate the hydrogen
economy by creating a demand for
“back to base” vehicles in the 20 to 25
tonne range, such as bus or refuse truck
fleets, an electrolyser producing 1,000
kg a day of hydrogen is recommended.
This is in-line with the market capability
for small scale electrolysers and the
market availability for hydrogen buses
and the medium sized goods vehicles.
As the demand grows towards 2030, a
hydrogen requirement of approximately
27,000 kg a day is predicted. Based on
the annual short term hydrogen demand
of 10,000 tonnes/yr. for Moray and
assuming an offshore wind power supply
with a capacity factor of 50%, a 130 MWe
electrolyser system (which includes
losses) will be required. If the electrolyser
is connected directly to the grid, a 100%
capacity factor can be used, reducing
the electrolyser size to 65 MWe.
Hydrogen
Demand Kg/Day
Hydrogen Demand
Tonnes/Year Capacity Factor Electrolyser
Size MWe
Approx.
Footprint m2
1000 365 100% 2.3 663
27,000 10,000 50% 130 25,000
27,000 10,000 100% 65 12,000
126,000 46,000 100% 300 50,000
Table 5.2: Electrolyser Sizes
A primary large-volume, centrally
placed hydrogen production facility
will typically require for 1 to 5 days of
hydrogen storage to accommodate
wind profiles, demand fluctuations
and short-term outages
For Moray, the storage requirement
is assumed to be equivalent to one
day’s production which is 1,000 to
27,000 kg. This will make this facility
a lower tier COMAH site (greater
than 5 tonnes of hydrogen) and the
appropriate approval will be required
as part of the site permitting process.
27,000
kilograms of hydrogen
approximately to be required a day
as demand grows to wards 2030
Page 78

Page 79

32  I  Mott MacDonald  I  Confidential | Moray Hydrogen Strategy Report DRAFT
6. Moray Hydrogen
Production
Potential locations for the production of hydrogen
within Moray were evaluated to take into account
the views of the stakeholders, the predicted
demand for hydrogen in the short, medium and long
term, and the availability of electrical power. Also
considered were the existing initiatives for economic
development and reducing poverty within Moray.
Page 79

Page 80

6.1 Introduction
Six potential locations have been
identified to produce hydrogen
within Moray during the short,
medium and long term.
6.2 Short Term Production
Locations (to 2030)
Introducing hydrogen production in
Moray in the short term by delivering
a pilot sized project to encourage
demand, stimulate the economy, test the
infrastructure and provide opportunities
for learning for further growth. There
are four potential pilot project locations
that can be considered for immediate
implementation. These are outlined
below. It should be noted that for all
potential pilot projects, further work is
required to identify supporting partners,
to determine initial levels of demand to
inform the size of the pilot project as
well as suitable and available locations.
6.2.1 Lossiemouth
This opportunity was identified during
the stakeholder engagement phase
with RAF Lossiemouth. The RAF are
intending to install a Solar PV Array
on Ministry of Defence (MoD) land just
outside the RAF Lossiemouth Station
boundary. There is an opportunity for
Moray Council to partner with RAF
Lossiemouth to develop a pilot project
to produce hydrogen in Lossiemouth.
A combined electrolyser and hydrogen
refuelling station would be located
approximately six miles from Elgin
and could offer a hydrogen re-fuelling
station for Council HGVs. The RAF are
investigating the potential of powering
their larger vehicles with hydrogen
and so there is further opportunity
for cost-sharing of the hydrogen
infrastructure and for this to be further
developed beyond the pilot stage.
Further work is required to be carried
out with the RAF to determine the spare
capacity, options for expanding the Solar
PV Array and the land that would be
required for the hydrogen infrastructure
including a fuelling area. It is likely
that to make a viable hydrogen hub,
the available solar energy will need to
be added to with a grid connection.
6.2.2 Aberlour
Aberlour was identified as a pilot project
for hydrogen generation due to the
concentration of whisky distilleries and
major transport logistics companies
based in or close to Aberlour. Due
to the demand in this area and the
desire of industry within the area to
be part of the hydrogen economy,
a hub within Aberlour has a high
chance of success. The transport
logistics companies within Aberlour
are currently investing in hydrogen
vehicles and hydrogen technology. They
are interested in working with Moray
Council to develop a hydrogen solution
for the whisky transport industry.
A hub in Aberlour would provide a
“southern” Moray hub and link on
A95 between Keith and Grantown on
Spey / Aviemore (and onward to Perth
and the Central-Belt). Consideration
should also be given to expansion of
pilot project to meet forecast medium
and long-term demand in this area.
Page 80

Page 81

34  I  Mott MacDonald  | Moray Hydrogen Strategy Report
6.2.3 Buckie Harbour
Buckie Harbour was identified as a
potential pilot project location during
the stakeholder engagement phase
with Moray Council and local industry.
The maintenance base for the Moray
East and Caledonia offshore wind
farms (Ocean Winds) will be Buckie
Harbour. Ocean Winds intend to
operate their Crew Transfer Vessels
(CTVs) using Hydrogen (potentially
from 2025). There is also potential
demand for hydrogen from the fishing
industry in Buckie Harbour as well
as HGVs from the Maltings and other
heavy industry in and around Buckie.
There is significant potential demand
at this location. This would also
act as a development agent within
Buckie and support the Council’s
Harbour masterplan ambitions.
6.2.4 Elgin
Elgin was identified as a potential
location for hydrogen production and
a pilot project due its central location
within Moray and the significant amount
of potential “early” hydrogen users such
as Moray Council’s large-vehicle fleet.
Elgin is the base for the majority of the
Council’s large-vehicle fleet and also has
a large bus depot. It is the main centre
for emergency services vehicles within
Moray as well as many other potential
hydrogen vehicles users from industry
and therefore maximise the chances
of success for a pilot project. These
“back to base” transport users such as
the bus fleets or refuse vehicles are
ideal first applications for hydrogen.
The A96 runs through Elgin and
significant volumes of HGVs go through
Elgin on a daily basis. A location close
to or on the A96 would be attractive to
potential users and provide a connection
on the A96 for Hydrogen users between
Aberdeen and Inverness. For example,
re-configuring part of the Lossie Green
Car Park that currently has HGV parking
or a new HGV parking facility with a
hydrogen fuelling station would be
attractive to transport companies.
It should be noted that a similar
pilot project hub could be placed in
Forres or similar sized town if it was
felt that in the short-term this offered
more benefit and there was desire
from industry in Forres to support.
6.3 Medium Term Production
Locations (2030-2040)
As the hydrogen demand expands within
Moray and the hydrogen economy
develops, any installed electrolysers
could be expanded. By this time,
hydrogen could also be purchased and
delivered from suppliers based outside
the Moray area as more hydrogen
generation facilities become operational
in Scotland. Transitioning the hydrogen
production from small to medium and
large-scale would be relatively straight
forward. Firstly, due to the modular
nature of electrolysers, the stacks can
be easily combined in groups to give
various plant/block sizes as show in
Figure 6.1. Secondly, as part of the
project development plan, new blocks
can be added over time. The use of
this type of repeat engineering would
reduce overall engineering costs and
simplify procurement. The additional
blocks could also be added early or
delayed depending on actual demand
growth. A degree of forward planning
would be required, for example allowing
additional plot space for the future
blocks, and the provision of tie-in points
at existing blocks and infrastructure to
simplify connection of the new systems.
Figure 6.1: Modular Nature of Electrolysers
Source: NEL6
potential locations to produce
hydrogen within Moray
Page 81

Page 82

Based on the demand profile it would be
feasible to reach the capacities required
in the short, medium and long term by
installing multiple identical blocks in
gradual steps up to 2045 and beyond.
Connecting an electrolyser directly to
the power output cable from a wind farm,
known as direct wire, or alternatively
connecting to a substation linked to a
wind farm could have economic benefits.
The wind farm may produce excess
power that cannot be transmitted by
the grid network due to constraints or is
not required by the grid network due to
low power demand. This excess power
could be offered to a local user such as a
hydrogen producer at a favourable price.
A detailed cost benefit analysis will be
required to evaluate the viability and will
depend on the commercial terms agreed
with the suppliers of the electricity.
Further work is required to identify
partners from the offshore wind farms
to support hydrogen production
within Moray.
Other potential sites for producing
hydrogen can be considered for the
medium and long term to take advantage
of increasing hydrogen demand and
access to higher capacity wind power.
Two examples are shown below:
6.3.1 East of Portsoy
The 1000 MW Caledonia offshore wind
farm is currently under development
and is expected to enter operation in
2028. It is likely that the power cables
will be routed to land at a location to
the east of Portsoy. The cables from
the proposed offshore wind farm
cannot cross the Moray East offshore
wind farm and therefore will need to
come onshore to the east of Portsoy.
Excess power capacity could be used
for the benefit of Moray by siting
an electrolyser close to the power
source or by transmitting power
back to Moray using a dedicated
cable or the existing grid network.
Further analysis on the economic
benefits including defining the
potential commercial terms with
the operator is recommended. 
6.3.2 Blackhillock
The Blackhillock substation is the
largest in Scotland and has access
to power from renewable sources as
well as national generators via the
national power grid. For example, the
588 MW Beatrice Wind Farm delivers
its electricity into this substation.
Blackhillock is also a suitable location
for distributing hydrogen using tube
trailers or a new pipeline network to
nearby industrial users and the wider
transport network within Moray.
There are also social benefits associated
with investing in the Blackhillock area
including the creation of jobs. With
its proximity to Keith, it offers the
opportunity for development of this area
to be the renewable hub of Moray.
6.4 Long Term Hydrogen
Production Locations
In the long term – i.e. 2040 and
beyond, the existing electrolysers in
Moray can be expanded further to
meet increasing demand, and it should
also be possible to bring in hydrogen
from suppliers outside of Moray via
tube trailer road transport, a new
pipeline network or by repurposing
the existing gas distribution network.
The maps on the next 2 pages (Figure
6.2 and Figure 6.3) present both
the short-term and medium/long
term demand scenarios, illustrating
renewable energy and grid supply
sources, end users (distilleries and
potential HRS locations), the existing
natural gas infrastructure network
and potential electrolyser locations.
Page 82

Page 83

36  I  Mott MacDonald  | Moray Hydrogen Strategy Report
Figure 6.2: Potential Short-Term Production Sites
Page 83

Page 84

37  I  Mott MacDonald  | Moray Hydrogen Strategy Report
Figure 6.3: Potential Medium/Long Term Scenario
Page 84

Page 85

38  I  Mott MacDonald  I  Confidential | Moray Hydrogen Strategy Report DRAFT
7. Gas Network
Infrastructure
The economic distribution of hydrogen throughout
Moray is key to developing a long-term viable
hydrogen economy. A pipeline network is the
most effective method for the distribution of
large volumes of hydrogen to the industrial and
domestic users within Moray. This can be achieved
by installing a new hydrogen pipeline network or
repurposing the existing gas network for hydrogen.
Page 85

Page 86

39 I Mott MacDonald  | Moray Hydrogen Strategy Report 
7.1 Introduction
The “Draft Hydrogen Action Plan”, published by the Scottish Government on 10th
November 2020 includes the following statement:
Also, the Scottish Government’s “A
vision for Scotland’s electricity and gas
networks” published 12th March 2019
includes the following statement:
“Our vision: By 2030… gas networks
remain a vital and flexible component
of Scotland’s national infrastructure,
delivering affordable energy for heating
our homes and businesses. The energy
resource carried by the networks will
be lower carbon than it is today. The
policy, regulatory and technical
developments will have been put in
place to allow natural and low carbon
gas to be blended in the networks,
including a contribution from hydrogen.
We will support initial action by SGN on their
pathway to converting large segments of
their network to 100% hydrogen, wherever
those actions are commensurate with keeping
options open and limiting consumer costs.
We will also understand clearly the
feasibility and costs of repurposing the
gas networks to carry 100% hydrogen
and will have made strategic decisions
about the long-term role of the networks
and the wider decarbonisation of heat.”
The gas network in Moray can be split
into its pressure tiers, High Pressure
(above 7 barg), Intermediate Pressure
(between 7 and 2 barg), Medium
Pressure (between 2 barg and 75
mbarg) and Low Pressure (75 mbarg
and below). The existing gas network
is examined and the considerations
for each pressure tier as broken down
above when converting the network
from natural gas to hydrogen.
Page 86

Page 87

40  I Mott MacDonald  | Moray Hydrogen Strategy Report
7.2 Existing Gas Network
The existing gas network in the area
consists of a DN250 High Pressure
(HP) pipeline that forms the backbone
of the local transmission system in
the area. There are two HP offtakes
that run to Buckie and Rothes where
there are pressure reduction stations
that reduce the pressure from HP
to Intermediate Pressure (IP) and
supply the local towns and villages
as well as the local distilleries.
Figure 7.1: Existing Gas Network Excluding Industrial Users
Source: Mott MacDonald
In addition to the two HP offtakes
there are pressure reduction stations
along the pipeline at Coachford (which
also supplies Keith), Elgin (which also
supplies Lossiemouth, Lhanbryde,
Fochabers and Fogwatt) and Forres
(which also supplies Kinloss and
Kinloss Barracks).
A simplified diagram of the gas
network is shown below in Figure
7.1 which excludes the distilleries
that are predominantly fed via the
IP pipeline downstream of the HP/
IP PRS near Rothes.
Page 87

Page 88

41  I  Mott MacDonald   | Moray Hydrogen Strategy Report                            
7.3 High Pressure Network
The HP gas infrastructure in Moray
consists of the primary DN250
pipeline that supplies the local IP
and Low Pressure (LP) gas networks
and five pressure reduction
stations along the pipeline.
7.3.1 High Pressure Pipeline
The primary HP pipeline is 250mm
nominal diameter and the supplies to
Rothes and Buckie are 250 and 200mm
respectively. The age and condition
of the HP pipelines are unknown;
however, research undertaken to date
has shown that steel transmission
pipelines are generally suitable for
hydrogen service and as the pipeline
is likely to be constructed from L360
grade steel pipe it is likely to be
suitable for hydrogen service.  
7.3.2 HP Pressure Reduction Stations
There are 2x HP-IP pressure reduction
stations at Rothes and Buckie and
1x HP-MP pressure reduction station
at Coachford. The equipment on
all 3 pressure reduction stations
will be very similar and contain the
following typical equipment:
• Filters – Filters are used to remove
any dust or particles within the gas
stream before the pressure is reduced.
• Pre-Heat – To heat the gas prior to
pressure reduction where the gas
temperature drops due to the Joule-
Thompson effect. Pre heating the gas
ensures that regulators do not freeze.
• Regulators – To reduce the pressure
of the gas from transmission
pressure of around 70bar to IP
or MP for local transmission.
• Meters – Meters may be installed at
the pressure to allow understanding
of the gas flows and support network
analysis by the gas network owner.
The meters are non-fiscal.
The performance and suitability of
the existing equipment on pressure
reduction stations has not yet been
fully researched however initial
findings indicate the following:
• Filters – Filters are generally expected
to be acceptable however seals
are likely to need replacement.
• Pre-Heat – Hydrogen will not require
pre-heat as it exhibits a reverse
Joule-Thomson effect meaning
that its temperature increases
during pressure reduction rather
than reducing as is the case for
most gasses including methane.
• Regulators - Pressure regulators
are likely to be generally suitable
however the associated control
systems will need replacement.
• Meters – Meters are expected to
require replacement as they will be
unsuitable for hydrogen however
depending on the meter type it may be
possible to modify the existing meters.
Page 88

Page 89

7.3.3 Challenges & Next Steps
The HP system at Moray is relatively
simple however this creates a challenge
when converting the network to
hydrogen as there is a single HP
pipeline that feeds the area and when
converted to hydrogen all downstream
users would also need to be converted
which would not be possible without a
considerable disruption to supply. It will
also be necessary for the gas network
operator to undertake network analysis
to determine if the existing pipelines and
pressure reduction installations would
have sufficient capacity as the relatively
low calorific value of hydrogen compared
to methane will require around 3 times
the flow to provide the same energy.
It is highly likely that a parallel Local
Transmission System (LTS) for hydrogen
will need to be installed to allow gradual
conversion of discrete areas and end
users to hydrogen to avoid disruption
of supply. To allow this, a new HP
hydrogen pipeline and associated
pressure reduction stations would be
installed, and both the existing and new
HP systems ran in parallel during the
conversion process. Installing a new
LTS network in Moray would also allow
the network to be correctly sized for
the expected hydrogen flows rather
than rely on existing infrastructure.
Work is currently underway by the gas
networks to determine the most suitable
means of converting the network to
hydrogen including studies to determine
the number of end users that can be
converted at one time and if a parallel
LTS will be required. It is recommended
that once this work has been completed
by the networks the findings are applied
to Moray to determine the extent of new
infrastructure that will be required.
7.4 Intermediate Pressure Network
The IP network primarily supplies gas to
the local towns and villages as well as
the industrial end users (e.g. distilleries).
There are three main IP systems which
are supplied by the HP/IP pressure
regulating installations located south of
Buckie, adjacent to Inchgower Distillery,
North of Rothes and Southeast of Elgin.
The 3 gas networks have a single point
of supply and are linear in nature but
will incorporate isolation valves to allow
sectionalisation of the network which
may aid conversion to hydrogen.
The IP pipelines fed from the three HP/
IP pressure reduction stations feed
the majority of the local domestic and
industrial users and include a number
of IP/LP district governors which
reduce the pressure to 75 mbar.
7.4.1 Intermediate Pressure Pipelines
The IP network will be constructed
from PSL 2 Grade L245 or B steel pipe
or PE100 SDR 11 polyethylene (PE)
pipe. PSL 2 Grade L245 and B steel
pipe have been found to be suitable
for hydrogen as they are more ductile
grades of steel so have been found to
be less susceptible to embrittlement.
PE pipe has also been found to be
suitable for hydrogen usage therefore
repurposing the IP pipework for
hydrogen is not expected to be an issue. 
7.4.2 IP Pressure Reduction Stations
IP pressure reduction stations are far
smaller and simpler than HP pressure
reduction due to the smaller pressure
drop and flows and are normally small
skid mounted district governor modules
contained within GRP kiosks. Similar
to the HP pressure reduction stations,
the IP/LP governors will contain filters
and regulators but due to the small
pressure drop (7 bar to 75mbar) no
pre-heat system is required as the
temperature drop is only 3.5 °C.
Research on the suitability of the
district governors is ongoing however
current findings indicate that they will
not be suitable for hydrogen due to
the compatibility of certain materials
within the key components. Due to
the relatively low cost and ease of
replacement it is expected that district
governors will be replaced as part of
a hydrogen conversion strategy.
Page 89

Page 90

43  I  Mott MacDonald  | Moray Hydrogen Strategy Report
7.5.2 MP Pressure Reduction Equipment
MP pressure reduction equipment
(district governors) are similar to IP
governors and have the same issues
and challenges. As with IP governors
it is likely that they will be replaced as
part of any hydrogen conversation.
7.5.3 Challenges & Next Steps
The MP networks supply significantly
less consumers therefore it may be
possible to assess the networks and
undertake the conversion of the four MP
networks within an acceptable outage
period. It is recommended that when the
overall network design is undertaken the
requirement for the existing MP network
is assessed as it may be possible to
optimise the network to reduce the
number of pressure reduction stations.
.7.4.3 Challenges & Next Steps
The key challenge with the conversion
of the IP network is similar to the
HP network regarding the number
of end users that would need to be
converted at one time when each of
the IP mains was decommissioned
and re-commissioned with hydrogen.
The IP pipeline fed from the HP/IP
pressure reduction station south of
Buckie for example supplies Buckie,
Findochty, Porknockie, and Fogwatt.
When the IP main is converted it will
be necessary to purge all downstream
pipework on the network up to the
domestic appliances then undertake any
conversions such as burners changes
in appliances before recommissioning
gas supplies with hydrogen.
7.5 Medium Pressure
There are two main MP networks
within Moray, one that feeds Keith and
Coachford from a HP/MP pressure
reduction station south of Coachford
and a second that supplies Forres,
Kinloss and Kinloss Barracks from
a pressure reduction station south
of Kinloss. There are also two small
MP networks that are fed from the
IP network that feed parts of Elgin,
Lhanbryde, Mosstodloch and Fochabers. 
7.5.1 Medium Pressure Pipeline
MP pipelines are generally constructed
from various grades of PE pipe which is
suitable for hydrogen usage. Depending
on the age of the networks, historic
materials such as ductile iron pipe which
was introduced in the 1970s may be
present; however, the gas networks have
been undertaking mains replacement
schemes to ensure that these have been
replaced with PE and the works will be
complete prior to hydrogen conversion.
7.6 Low Pressure
The LP network consists of the local
pipework that supplies the domestic
and some commercial end users. The
LP network will be suitable for hydrogen
as again polyethylene pipe is used. The
LP pipework and domestic supplies
will be suitable for hydrogen and the
network should be able to be isolated
as necessary to allow sections of the
network to be converted to hydrogen
at a manageable conversion rate.
Page 90

Page 91

44  I  Mott MacDonald  | Moray Hydrogen Strategy Report
7.7.1 Hydrogen Source
Large quantities of blue hydrogen are
assumed to be the main hydrogen
source during the transition from
natural gas due to the requirement for
security of supply and intermittency
of green hydrogen. Blue hydrogen is
generated from natural gas sources
where the carbon dioxide by-product
is captured and stored to prevent
release to the atmosphere. It is likely
that blue hydrogen will be produced at
or near to the St Fergus terminal and
therefore a single feed of hydrogen
similar to the existing natural gas supply
will be the primary source. As green
hydrogen sources come online which
may require additional pipelines for them
to feed into the gas network additional
opportunities may become available to
extend the network organically and add
additional users onto the gas network. 
7.7.2 Potential to Expand
the Gas Network
The use of alternative routes for the
necessary parallel HP and IP hydrogen
networks could be considered to
encompass additional areas. If the new
infrastructure was designed to tie into
the end of the existing network, it may
be possible to convert the existing
network in smaller manageable sections
(for example install a new HP pipeline to
Fochabers rather than Elgin then convert
from Fochabers to Elgin in sections).
This approach would require suitable
pipeline routes and may be considerably
more expensive than following the
existing infrastructure with little
advantage unless a significant number
of additional consumers were found.
7.7 Future Hydrogen Network
After analysing the Moray gas network
model, it is highly likely that a new
hydrogen network would look very
similar to the existing natural gas
network. The routing of existing
pipelines has taken advantage of
favourable topography so similar routes
are expected to be followed for a new
network. Due to the dispersed nature
of the dwellings not supplied by the
existing gas network it’s unlikely to be
economic to try to expand the network
to encompass additional areas.
To ensure that the new gas network
is suitably sized it will be necessary
for the network operator (SGN) to
undertake a network analysis based
on the current gas demand to ensure
that both the new network and any
pipework to be repurposed for hydrogen
on any pressure tier is suitably sized
for the increased flows of hydrogen.
Page 91

Page 92

45  I  Mott MacDonald  I  Confidential | Moray Hydrogen Strategy Report DRAFT Moray Hydrogen Strategy Report DRAFT  I  Confidential | Mott MacDonald | 45
8. Economic and
Funding Analysis
A high-level economic analysis has been
undertaken to provide an indicative range
of the cost of hydrogen production of the
proposed supply options. The analysis is
based on Levelised Cost of Hydrogen (LCOH)
methodology which is widely applied in industry.
Page 92

Page 93

46  I  Mott MacDonald  | Moray Hydrogen Strategy Report 
8.1 Levelised Cost of
Hydrogen Calculation
LCOH is the discounted lifetime cost
of building and operating the asset,
expressed as a cost per energy unit
of hydrogen produced (£/kg of H2).
LCOH is defined as the Net present
value of the total life cycle cost divided
by the Net present value of the total
lifetime hydrogen production
A number of economic and technical
assumptions have been made to
standardise the various parameters
used in the analysis, including:
• We assume an operating
life of 20 years
• A discount rate assumption of 5% has
been applied to derive the costs and
production net present values (NPV)
• All values are expressed in real
2022 money. No inflation has been
added to numerator or denominator
of the LCOH calculation
• An electrolyser efficiency
is assumed at 68%
• The electricity utilisation factors are
as provided in Table 8.1. No stack
replacement, decommissioning
or power connection costs
have been included.
The project life cycle costs include the
capital and operating costs described
below.  A chart on the left summarises
the results of the LCOH runs for
the supply options. This shows an
approximate range is £4.6 - £7.1 per kg
of H2. The LCOH tends to be lower in
the options with the larger size of the
production due to the economies of
scale based on the electrolyser specific
capex and the fixed operating costs
dilution. Also, the differences in the
LCOH are also impacted by other capital
costs, such as hydrogen distribution
costs, and the electricity costs.
The levelised costs of hydrogen
estimated in this analysis are significantly
higher than the competing fuels.
Converting on a high heating value the
LCOH numbers work out at £117-180/
MWh versus average industrial gas
price for the last 5 years to Q2:2021 was
under £30/MWh. Adding on the carbon
cost of £80/tonne CO2 would raise
uplift the gas numbers by £16/MWh. 
Current gas prices have not been
considered as these have been impacted
by the post covid commodity boom
and latterly the Ukraine war and the
expectation is that gas prices will come
down after more normal conditions are
resumed probably by 2025. The most
recent quarterly data shows gas prices
of about £40/MWh, with the expectation
of £50/MWh being reached in 2022.
Given the high costs of hydrogen it is
unlikely that any of these projects would
be commercially viable without support
in the foreseeable future, without some
public financial support or guaranteed
off-take. The Government has proposed
that the Contract for Difference (CfD)
support mechanism be implement for
clean hydrogen projects and in now
working with industry to structure
the arrangements. This is likely to be
a two-way CfD like those applied to
renewable generation projects.
Figure 8.1: LCOH of the supply options
Page 93

Page 94

47  I  Mott MacDonald  | Moray Hydrogen Strategy Report 
Under this scheme the hydrogen
producer will be guaranteed a fixed price
(possibly indexed to inflation) called the
strike price. In this case the reference
price (representing the market price)
will be set by the natural gas price with
the appropriate carbon uplift. When the
strike price is above the reference price
the hydrogen producer will receive a
top up (positive difference) payment,
while in the unlikely event of the strike
price being below the reference price
the difference payment will flow from
the hydrogen producer to the offtaker.
Given the need for substantial public
support, these arrangements will be
only allocated by government, probably
via some tender mechanism. The initial
allocations are scheduled for 2023/24.
There are other support options.
It is possible that in some high
value market sectors, such as clean
transport fuels, a combination of grant
funding and other special treatment
would allow a dedicated hydrogen
production and filling station project
to become commercially viable.
8.2 Project Capital Costs
A concept level Class 5 cost estimate has
been provided in accordance with AACE
18R-97: Cost Estimate Classification
System, as applied in Engineering,
Procurement, and Construction for the
Process Industries. Typical accuracy
ranges for Class 5 estimates are -20% to
-50% on the low side, and +30% to +100%
on the high side, depending on the
technological complexity of the project.
Electrolyser
Size MWe
Cost Estimate
(Electrolyser and Storage) Notes
2.3 £3.7m Pilot project, suitable for Lossiemouth,
Aberlour, Buckie, and Elgin.
65 £82m
130 £134m
300 £339m Potential long term hydrogen production in
Moray.
Table 8.1: Order of Magnitude Cost
Additional Costs:
• A 1000Kg / day Hydrogen
Refuelling Station will cost
approximately £1.6m per station.
• Tube trailer loading facilities for the
distribution of hydrogen, including tube
trailers will cost approximately £3.6m.
Exclusions and assumptions:
• It is assumed that tube trailer
haulage, if required, will be
provided by a haulage company
• Owner’s costs have been excluded
• Contingency has been excluded
• Licence Fees has been excluded
• Import Duties has been excluded
• Taxes has been excluded
• Insurance has been excluded
• Escalation has been excluded
Power Supply Utilisation
Factor
Delivered
Costs, £/
MWh
On-Shore Wind 35% 50
Off-Shore Wind 50% 55
Grid 100% 70
Table 8.2: Power Supply Costs
8.3 Project Operating Costs
The largest component the operating
costs is the power supply. Table 8.2
below shows the assumed power
utilisation factors and delivered costs
assumptions based on the “ballpark”
estimates for on-shore, off-shore and
grid supply options. The power utilisation
factors include downtime for electrolyser
maintenance. And the power delivered
costs are as seen in similar projects
based on long term supply contracts.
Other variable operating costs, that
include water supply, are assumed
at £1/MWh for all of the options.
The Fixed operating costs are
assumed at 2.5% of the upfront
capital costs per annum.
Page 94

Page 95

48  I  Mott MacDonald  | Moray Hydrogen Strategy Report 
8.4 Government Policy and
Funding Mechanisms
Government funding and resources
may be available to support hydrogen
projects and technologies, such as
the initiatives proposed for Moray.
8.4.1 Just Transition
The report published by the Just
Transition Commission “A national
mission for a fairer, greener Scotland”,
published 23rd March 2021, provides
recommendations to the Scottish
Government on the actions required to
transition to net zero ensuring climate
action, fairness and opportunity are
delivered to the communities in Scotland.
The initial response by the Scottish
Government “Just Transition”
published 7th September 2021
covers the 4 key messages:
Source: Just Transition, A Fairer, Greener Scotland
www.gov.scot
8.4.2 Green Jobs Fund
A £100 million Green Jobs fund is
intended to support new and increased
job opportunities for green job creation
across Scotland. The strategy for
net zero transition and introducing a
hydrogen economy in Moray could
be eligible for funding support.
8.4.4 Climate Change Plan
The “Update to the Climate Change Plan
1028-2032” published 16th December
2020 by the Scottish Government also
identifies several potential funding
sources applicable to the hydrogen
economy within Moray, some of these
have been mentioned above.
8.4.5 The Net Zero Hydrogen Fund
The Net Zero Hydrogen Fund opened
April 2022, by the Department for
Business Energy and Industrial
Strategy, has a value of £240m and
may also provide development
funding costs for the proposed
Moray hydrogen generators.
Fund Value Notes
Just Transition Fund £500m For North East Scotland and Moray
Energy Transition Fund £62m
Energy Technologies Fund (Hydrogen) £100m
Scottish Zero Emission Bus Challenge
Fund £50m
Low-Carbon Manufacturing Challenge
Fund £50m
Green Growth Accelerators Programme
(local authorities) £200m Public and private investment
Green Jobs Fund (Enterprise Agencies) £100m As mentioned above
Table 8.3: Available Funds to support a Hydrogen Economy
8.4.3 Hydrogen Action Plan
The “Hydrogen Action Plan, Draft”,
published 10th November 2021 by
the Scottish Government sets out
key actions during the next 5 years
for the development of a hydrogen
economy in Scotland, as defined in
“The Hydrogen Policy Statement”
published in December 2020.
The Hydrogen Action Plan identifies
key areas of Scottish Government
funding where resources may be
available to support hydrogen
projects and technologies.
A selection of the funds that may be
applicable for supporting the introduction
of a hydrogen economy in Moray
are provided in the table below:
Page 95

Page 96

49  I  Mott MacDonald  |  Moray Hydrogen Strategy Report 
8.5 Gross Value Added (GVA)
The development of a hydrogen
economy within Moray will bring
many benefits to the region including
inward investment, creation of new
opportunities and jobs, retention and
development of young persons in Moray.
Inward investment in the hydrogen
supply, demand and infrastructure
within Moray offers a sustainable
economic growth opportunity with a
positive impact on reducing poverty.
Moray will be able to take advantage
of opportunities for economic growth
across the whole hydrogen value chain:
• Production: Moray has access to
signification sources of renewable
energy including onshore and offshore
wind and has access to the national
electricity grid infrastructure. Power is
available to start producing hydrogen
in Moray using electrolysis and to scale
up as the hydrogen economy grows.
• Storage: Hydrogen storage will be
required at the hydrogen production
sites, the hydrogen refuelling stations
and at the industrial users’ sites. The
provision of these facilities will bring
inward investment into the Moray area.
• Transmission and Distribution: In
the short-term hydrogen can be
generated close to the end users and
therefore a transport network is not
required. In the medium and long term,
infrastructure will be required for road-
based hydrogen transportation by tube
trailer and also pipeline distribution
that could include repurposing the
existing gas network within Moray.
• Downstream Users: The immediate
demand for hydrogen is predicted to
come from HGVs starting with “back
to base” vehicles such as buses
and council refuse trucks. Moving
towards the year 2030 and beyond,
the availability of large hydrogen
powered HGVs (using hydrogen fuel
cells or hydrogen fuelled internal
combustion engineers) will support
the growth in the hydrogen powered
haulage sector in Moray. Moray is
well placed to develop an economy
based on green road transportation
with the existing haulage companies
based in Moray and its position on
the A96 and A95/A9 corridors.
Scaling up hydrogen solutions in the
UK could unlock £18bn in GVA and
75,000 jobs by 2035. The community in
Moray can benefit from this investment
and grow the hydrogen economy.
Page 96

Page 97

Some typical consumers and applications of oxygen are:
• Steel production (combustion in furnaces)
• Welding (combustion in oxy-welders)
• Power generation (oxy-fuel combustion)
• Oil refining (combustion in FCC & SRU)
• Automotive and transportation (combustion
in laser cutting equipment)
• Glass and ceramics production (combustion in furnaces)
• Aerospace and aircraft (in liquid-fuelled
rockets) (combustion in engines)
• Minerals refining (oxidation)
• Water treatment (aerobic fermentation)
• Manufacture of medicines (fermentation)
• Health care (oxygenation)
• Fish farming (oxygenation)
• Breathing apparatus (e.g. underwater
work, chemical plant) (oxygenation)
• Pulp / paper industry (delignification, combustion, oxidation)
• Biotechnology (oxygenation for cell growth)
• Syngas production / gasification (partial oxidation)
• Food industry (shielding gas for food preservation)
8.6.2 Oxygen
Oxygen is a by-product of the
hydrogen production process; it also
has a significant commercial value.
Providing oxygen to nearby consumers
by pipeline or as compressed gas
would provide an additional revenue
for the project. However, this again
must be balanced against the cost
of the additional infrastructure
required to process the oxygen.
Oxygen is widely used in industrial,
medical, and scientific applications,
generally to improve the efficiency
for the following processes:
• Combustion
• Oxidation
• Fermentation
• Oxygenation
8.6 Additional Revenue Streams
8.6.1 Waste Heat Integration
The electrolysers produce a significant
amount of waste heat. Instead of
simply removing this through the
cooling water system, some of
this heat can be utilised for district
heating, agriculture (greenhouses),
industrial space heating or low
temperature process heating/drying.
It should be noted that a cooling water
system would still be required to balance
the seasonal changes in the hot water
demand for the district heating system.
Integration with a district heating
system would potentially provide an
additional revenue for the project.
However, the cost of constructing a new
local district heating system and the
infrastructure to circulate the hot water,
would be significant and the economic
viability would need to be evaluated.
Page 97

Page 98

51  I  Mott MacDonald  I  Confidential | Moray Hydrogen Strategy Report DRAFT Moray Hydrogen Strategy Report DRAFT  I  Confidential | Mott MacDonald | 51
9. Social Benefits
Moray is considered a natural location to establish
a Hydrogen economy and develop wider green
technologies to support Scotland’s renewable energy
supply chain. There are significant opportunities
to generate local community benefits in relation to
social, economic, and environmental wellbeing.
These in the main align with recognised benefits associated with the green transition,
including reduced carbon emissions, long-term generation of high-quality, well-paid
jobs, upskilling the local workforce in high growth areas against skills shortages,
opportunities to attract inward investment, increased diversity and competition in
local markets, and the overall improvement of community cohesion and wellbeing.
Page 98

Page 99

52  I  Mott MacDonald  |  Moray Hydrogen Strategy Report 
This report provides an overview of the
potential community benefits that could
be achievable through the development
of a Hydrogen economy within Moray.
There are significant opportunities for
embedding and maximising community
benefits throughout the lifecycle and
development of projects that will form
part of the Moray Hydrogen Economy.
These include the scoping, design,
construction, and in-use phases.
This section of the report focuses on
the high-level potential community
benefits; however, specific advice can
be provided on how best to realise
benefits through the various phase of
the development - design, procurement,
construction, commissioning and in-use.
Momentum is building internationally
for hydrogen to play a key role
in a future decarbonised energy
system. Within Europe and globally,
nations are developing hydrogen
strategies and policy frameworks, to
set out their national ambitions.
Scotland’s vast renewable resources,
combined with its skills and supply
chain focused on energy transition,
are “critical to establishing a prominent
role for Scotland in the emerging
global hydrogen market”2. Owing to
the localised nature of green hydrogen
energy resources and associated
infrastructure, proposed schemes will
need to be designed in alignment
with Moray’s specific geography,
resources and communities.
² Scottish hydrogen: assessment report - gov.scot (www.gov.scot)
3 DYW-Positive-Futures-Survey.pdf (dywmoray.co.uk)
The area has a growing reputation
in developing digital and online
technologies to improve service delivery
and efficiency. There is a cluster and
critical mass of activity along the A96
Inverness to Elgin “corridor”, which
comprises 40+ organisations including,
NGOs, health boards, academia, and
commercial companies. The Digital
Health Innovation Centre is one of
the first organisations to benefit from
a £5million Moray Growth Deal to
deliver a Rural Centre of Excellence for
Digital Health and Care Innovation.
Moray is considered a natural location
to establish an engineering business to
support diversification into the renewable
energy supply chains, supported
by an increasingly digitally capable
and technically skilled workforce.
9.1 Moray – Local Context
Moray has an estimated population of
95,700 of which 61.2% are of working
age (below both Scotland, 63.9% and
GB, 62.4% averages). 77.4% of the local
population are economically active,
with 17% of the local workforce in
manufacturing, 10% in food and drink
manufacturing, and 10% in tourism. Moray
has a much larger proportion of skills
trade occupations (13.2%) and process
plant & machine operatives (10.85%)
than Scotland and GB averages. The
regional unemployment rate is lower in
Moray than in Scotland and GB, but there
is a marked increase in unemployment
within 16-24 age category. Reporting
shows a key barrier to employment in
the region is a disparity between young
people and employers’ perceptions
of entering the world of work. Specific
barriers for young people being cited
as anxiety & confidence issues (23%),
need for previous experience (22%),
discrimination on age, gender, or race
(11%), health conditions (10%), and
lack of local opportunities (10%)3.
Approximately 300 business start each
year in Moray, with a high proportion
of micro and SME-businesses being
based in the region. Perhaps owing to
its unique health ecosystem, Moray is
emerging as a prime location in research
and development for the life science,
digital and technology sectors. With
a number of purpose-built business
parks located at Elgin and Forres that
are home to thriving local businesses
such as Hunter Cow, IT Central, Fibre 1,
Orbex and Biomatric Water Solutions.
Page 99

Page 100

53  I  Mott MacDonald  | Moray Hydrogen Strategy Report
Theme Challenge Description
Social Access to Services
There are above average percentages of older people within Moray, particularly in more rural and coastal areas which creates challenges in
relation to service delivery & access, and social isolation. These groups are also more vulnerable to fuel poverty, owing to recognised differences
in quality and quantity of housing stock.
Social Education
There is a variation in outcome for young people in Moray in relation to attainment and post-school destination, which impacts on their choices
for their future. Only 61.2% of pupils leave school with one or more SCQF level 6 or 7 (Scotland average, 68.2%), and it is noted that the Moray
economy does not provide a good match for young people’s career aspirations: energy, financial services and life sciences.
Social Skills
Moray’s Local Outcome Improvement Plan reports that there is a mismatch between school leavers’ career aspirations and the local job market
and that gender inequality is a significant challenge in work4. This lack of local opportunities may explain the lower proportions of young people,
and particularly young women, in Moray. Young people are more likely to aspire to leave Moray than to stay - 45% compared to 40% for Highlands
and Islands5.
Social Equality
Moray has the fifth biggest pay gap between male and female residents in Scotland at 12.4% – trailing only behind Shetland within the Highlands
and islands6. As such, there is a regional need and aspirations to increase opportunities for young boys and girls in diverse fields as part of growth
planning.
Economic Economic Diversity
Moray’s economy is founded primarily in manufacturing (17.1% employment vs Scotland av. 7.4%), with a focus on the food and drink (11%
employment vs Scotland av. 1.7%), agriculture and tourism sectors (10% employment)7. The presence of two large defence establishments at RAF
Lossiemouth and Kinloss Barracks also creates employment opportunities for the area. This heavy reliance on a limited number of sectors means
the region is disproportionately at risk from local, national and global market changes within this sector for economic sustainability and associated
employment.8
Economic Business Growth
Moray has smaller businesses and slower rates of business growth than the national average. Micro enterprises with less than 10 employees
form 88% of all Moray businesses. The rural nature of the geographic location and competition from the more urban parts of Scotland poses a
challenge to attracting inward business investment.
Economic Quality of Work
Moray has relatively high employment rates in mainly low paid and low skilled industries with seasonal work common (over 1/5 of employees in
Moray earn less than the ‘real living wage’10). Weekly wage levels rates lag those of neighbouring authorities and the Scottish average (Moray -
£498, National average - £548)11. High-quality, well-paid jobs are needed to support local communities and economic growth.
Environment Fuel Poverty
A household is said to be in fuel poverty if it must spend more than 10% of its income on fuel, to heat their home to a satisfactory level. Latest
figures estimate that 34% of households within Moray are in fuel poverty, which is significantly above the Scottish average of 24%. Fuel costs are
also recognised as higher within rural areas, which means a significant proportion of Moray’s population would benefit from more economically
viable alternatives.
Environment Climate Change
With respect to CO2 emissions within the scope of influence of Local Authorities, as defined by the Department for Business, Energy & Industrial
Strategy, per capita emissions of Moray are the highest of any Local Authority in Scotland. This is attributable in large part to Industry and
commercial emissions per capita, 7.9t CO2 per person, compared to the Scottish average of 4.9t CO2 per person, and more specifically – the
consumption of gas. These high relative emissions are assignable to Moray’s whisky distilling sector, food producers and two MOD military
facilities.
Table 9.1: Local social, economic, and environmental wellbeing themes to be considered 4 LOIP (yourmoray.org.uk)
5 Understanding poverty in Moray - Poverty Profile (Feb 2018)
6 Moray vows to reduce gender pay gap as part of
city deal funding bid (pressandjournal.co.uk)
7 Find out about working and jobs in Moray Scotland | MyMoray
8 file123287.pdf (moray.gov.uk)
9 file113295.pdf (yourmoray.org.uk)
10 Ibid – Footnote 4
11 Ibid – Footnote 4
When understanding and contextualising the potential opportunities and benefits identified in relation to increasing hydrogen capacity
in the region, the following local social, economic, and environmental wellbeing themes should be considered (Table 9.1):
Page 100

Page 101

54  I  Mott MacDonald  |  Moray Hydrogen Strategy Report 
9.2 Regional Community Benefits
of Increasing Hydrogen Capacity
Moray Council has a vision for the
region to provide “a life of opportunity
for all, where people can thrive in vibrant
communities, and where we work
together to enrich our future”12.
There is a recognition that achieving
this vision will require a combined
and collaborative approach across
public, private, community and
voluntary organisations to identify what
stakeholder can do together to ensure
the local people and places flourishes.
To help achieve this, the following
priorities have been set for the region
in Moray’s Corporate Plan 2024:
• Our People: To provide opportunities
for people to be the best they can
be throughout their lives with a
strong and sustained focus on those
individuals and groups in Moray’s
society who experience the most
disadvantage and discrimination.
• Our Place: Empower and support
communities to build capacity.
• Our Future: Drive economic
development to create a vibrant
economy for the future.
12 Corporate Plan 2024 (moray.gov.uk)
13 The Moray Economic Strategy - Moray Council
14 Ibid – Footnote 12
When thinking about how development in general across Moray can lead
to local positive benefits in relation to social, economic, and environmental
wellbeing, we need to understand how identified opportunities
and impacts relate to this overarching vision for the region.
Table 9.2 below provides an overview of potential community benefits that
could be achieved in Moray from developing a local hydrogen economy.
Identified benefits from this development for local people and place have been
aligned to Moray Council’s priorities14 to show local relevancy and impact.
In line with these priorities, and wider
aspirations around providing long-term
economic stability for the region, Moray’s
Economic Strategy 2019-2024 sets our
four outcomes that need to be achieved:
• Qualification Levels: An
increase across all ages and
genders in qualifications
relevant to growth sectors
• Small Business Growth: More small
and medium-sized businesses
employing between 10 and 100 people
• Talent Attraction, Retention and
Return: More skilled, higher paid
jobs that deliver net in-migration
in the 16-29 age range
• Business competitiveness – An
increase in capital investment and
focused workforce development
to strengthen competitiveness.13
Page 101

Page 102

55  I  Mott MacDonald  |  Moray Hydrogen Strategy Report
Theme Benefit Description
Our
People
Employment
Opportunities
Developing a hydrogen economy will provide the opportunity to create new, high-quality jobs within Moray in a sector based on sustainable
resource management and protection. Not only can this help to alleviate current challenges within Moray around unemployment, but the provision of
opportunities within this high-growth, environmentally conscious space may help to attract more young-people to live and stay in Moray.
Our
People
Skills
Development
Developing Moray’s hydrogen capability will help to increase local awareness and access to training and upskilling opportunities related to the
green transition. Properly designed and resourced training in the local area can help to address recognised local skills shortages (which have been
exacerbated by the pandemic). This will help to generate beneficial outcomes for local businesses from having greater access to relevant talent, and
benefits for local people in helping them to access skills and knowledge required to advance their careers (linked to multiplier benefits of increased
financial security and wellbeing). Training can also support the transition of skills from local ‘brown’ industries (e.g., oil and gas) to green industries,
equipping them with skills needed to compete for opportunities. It is anticipated that local colleges and training providers will require support in
developing new training offering/courses that are specifically related to hydrogen. It is also expected that local colleges are currently unlikely to offer
this as a part of their standard teaching offer, and as such, specialist support will be needed to build local knowledge and capacity.
Our
People
Decreased
Fuel Poverty
A major strength in developing localised energy systems is that the system can be built around the relevant local resource and can closely match
and deliver energy to the end user when required. It is also expected that regional development of renewable energy sources will provide more
economically viable fuel sources for hard-to-reach areas, reducing current ‘pockets’ of deprivation seen across many rural areas. Shifting away from
fossil fuels is an opportunity to build a fairer and more equal society throughout Moray, that removes existing pockets of deprivation (e.g., rural areas).
Increased security and access to fuel is linked to improve mental and physical wellbeing outcomes for residents, helping to support sustainable local
communities. It is also recognised that any initial financial cost increase related to the transition from contemporary fuel sources to hydrogen, could be
counterbalanced by referenced improved employment opportunities and increased higher wages (wider socio-economic benefits).
Our
People Health
Pollution from burning fossil fuels (coal, oil, gas, diesel) is a contributory factor for asthma and other respiratory diseases. Reducing reliance and usage
of said fuels in the region can help to reduce local air quality and pollution risks, better safeguarding the health of residents and visitors and reducing
pressures on local health support services. Whilst Moray locally does not suffer from poor air quality, the transition away from fossil-fuel usage aligns to
national and international efforts around minimising health impacts as a result of pollution.
Our
Place
Community
Cohesion
There is the opportunity to enable Moray communities to collaborate with local private and public sector organisations in creating a shared vision
for the region. This will enable a smoother transition for individuals and regions through targeted skills and innovation support. For example,
stakeholders could explore ‘Community funded’ or ‘Community Ownership’ of any potential hydrogen scheme, with revenue-generated funnelled
into supporting local people, places, and businesses. Moray council have shown their interest in this approach / model as taken in Huntly.15 Overall,
greater engagement and connection to the scheme may alleviate and minimise challenges associated to the works, founded on a greater regional
understanding of the social, economic, and environmental wellbeing benefits associated to the transition.
Table 9.2: Overview of potential community benefits
14 http://localenergy.scot/wp-content/uploads/attachments/huntly-hydrogen-cares-case-study.pdf
Page 102

Page 103

56  I  Mott MacDonald  |  Moray Hydrogen Strategy Report
Our
Place
Community
Regeneration
There is also potential for community benefits to arise via future inward investment to the region because of perceived leadership / innovation around
hydrogen technologies. In 2021, Tees Valley became the home to the UK’s first-ever hydrogen transport hub and received £3m in government funding
to kick-start the programme. It is expected that the scheme will create up to 5,000 new jobs in the local area, with pop-up trials proposed for local
shops, supermarkets and transport companies to support them in understanding potential benefits from hydrogen technology for powering transport
and moving goods16. This type of scheme in Moray could attract similar investment and be a catalyst for local business growth and regeneration in the
area (linked into wider benefits referenced in this table).
Our
Place
Community
Regeneration
There is also potential for community benefits to arise via future inward investment to the region because of perceived leadership / innovation around
hydrogen technologies. In 2021, Tees Valley became the home to the UK’s first-ever hydrogen transport hub and received £3m in government funding
to kick-start the programme. It is expected that the scheme will create up to 5,000 new jobs in the local area, with pop-up trials proposed for local
shops, supermarkets and transport companies to support them in understanding potential benefits from hydrogen technology for powering transport
and moving goods . This type of scheme in Moray could attract similar investment and be a catalyst for local business growth and regeneration in the
area (linked into wider benefits referenced in this table).
Our
Future
Economic
Diversification
Moray’s local economy is currently reliant on three key industries. As hydrogen can be produced locally from several sources within Moray (e.g. off-
shore and on-shore wind), developing capacity will help to diversity the local market and support the transition to a sustainable, low-carbon economy
and related jobs (in high-value areas). It is also recognised that a hydrogen scheme of this nature is likely to bring greater interest from outside
investment, supporting and increasing local economic activity.
Our
Future
Economic
Growth
Investment in hydrogen technology can bring about jobs and continued advancements in every industry touched by it. For Moray, this can help to
future-proof existing markets, jobs, and businesses, whilst also providing a new space for local capabilities to develop into. This will help to foster
innovation within existing businesses and industry processes, supporting a wider transition within the region to more sustainable and green ways of
working. For those local organisations and people engaged with the proposed scheme, owing to the relative infancy of hydrogen technologies globally
(but increasing interest), there is the added benefit of being able to position themselves and access opportunities as they develop within domestic and
international markets.
Our
Future
Supply Chain
Growth
There is already significant momentum from both industry and government in hydrogen demonstration and development, supported by a complex
network of research and innovation programmes and funding sources. Co-ordination of the proposed development of Moray’s capacity with other
regional and national programmes across the hydrogen supply chain can support more efficient delivery and increase value for money. This may also
give Moray communities and businesses greater access to industry networks and best practice from other schemes, helping to better inform local skills
and knowledge development.
Our
Future
Regional
Collaboration
There is already significant momentum from both industry and government in hydrogen demonstration and development, supported by a complex
network of research and innovation programmes and funding sources. Co-ordination of the proposed development of Moray’s capacity with other
regional and national programmes across the hydrogen supply chain can support more efficient delivery and increase value for money. This may also
give Moray communities and businesses greater access to industry networks and best practice from other schemes, helping to better inform local skills
and knowledge development.
Table 9.2: Overview of potential community benefits
16 UK’s first ever hydrogen transport hub kick-started by £3 million government investment - GOV.UK (www.gov.uk)
Theme Benefit Description
Page 103

Page 104

57 I Mott MacDonald  |  Moray Hydrogen Strategy Report  Moray Hydrogen Strategy Report DRAFT I Confidential | Mott MacDonald | 57
9.3 Ten Recommendations for
Unlocking Community Benefits
The development of a Hydrogen
economy within Moray provides a
unique opportunity for unlocking and
generating community benefits for local
communities in line with the challenges
and priorities identified in this report.
In line with this, we have identified
10 activities or themes through which
any proposed hydrogen scheme
should focus on when strategising and
designing approaches to community
Initiative Description
Careers
Awareness
and Schools
Engagements
Successfully delivering any hydrogen scheme within Moray will require a consistent and diverse pool of talent that can suitably sustain people resource requirements.
To ensure there is consistent and sustainable development of local skills and knowledge around Hydrogen, local project teams can look to deliver engagement
sessions (e.g., industry insight days, careers talk, project talks, mentoring, CV advice, mock interviews) focused on building awareness and attracting more people to
hydrogen careers. This links into supporting local employment, skills, and training opportunities. Alignment to Moray Council’s Skills Pathway, Elgin Careers Centre, Skills
Development Scotland, DYW Moray and Moray First can help with engaging schools and defining engagement events.
Work Experience
and Internships
Moray struggles with an outward migration trend in young people following completion of education. There is therefore a need to improve local higher education
and early-years careers opportunities offering to make Moray a more ‘attractive’ location for young people. The nature of hydrogen schemes (i.e., long-term projects
requiring technical skills), provides an excellent springboard for promoting a diverse range of attractive and meaningful employment opportunities. Greater awareness
of employment opportunities within hydrogen will help to support continued entry of talent into the sector, helping to address local skills gaps. Existing schemes within
Moray that can be engaged with include: DYW Moray, Moray’s Work Experience Placement Entitlement Programme, Moray First, and specific institutions such as Moray
College UHI and University of the Highlands and Islands.
Apprenticeships
& Graduate
Placements
There is high potential for beginner entry level job opportunities to create social benefits through apprenticeships and early-years careers roles as part of any hydrogen
scheme. As noted, there is a growing skills base of manufacturing / research and development opportunities within engineering in Moray, and the proposed scheme
will feed into this. Any opportunities need to be designed with long-term benefits in mind, ensuring engaged individuals are supported to progress happy and fulfilling
careers in the region. Existing schemes within Moray that can be engaged with include: DYW Moray, Skills Development Scotland, and University of the Highlands and
Islands.
Local
Employment
Opportunities
The Healthcare cluster on the A96 corridor shows the potential of Moray to adapt and specialise around a certain skills base in recent years, which can similarly be done
with the introduction of a local hydrogen economy. It is important to recognise that local employment opportunities need to be aligned with local re-training / upskilling
opportunities to help local individuals transition between industries and/or non-technical to technical roles. Existing schemes within Moray that can be engaged with
include Moray’s Employer Recruitment Incentive, Moray Pathways Job Portal, Moray Council’s Employment Support Service, and the local Job Centre Plus.
Table 9.3: Examples of partner organisations
benefit generation to maximise the
relevancy and value of benefits
generated in line with local needs.
Where possible, any proposed schemes
should look to delivery activities in
partnership with local organisations,
community groups and existing
local initiatives to support efficient
and effective delivery of benefits.
Table 9.3 below provides examples
of partner organisations Moray
Council could engage with to support
their community benefit offering
against the targeted activities.
Page 104

Page 105

58  I  Mott MacDonald  |  Moray Hydrogen Strategy Report
Equality,
Diversity,
Inclusion &
Wellbeing
Suitably resourcing the growth of hydrogen skills and talent within Moray will require a diverse range of voices and people. Practices around recruitment, employment,
skills, and pay all provide an opportunity to embed principles that reduce barriers for under-represented groups of people with STEM industries (women, UK minority
ethnic, disabled persons, military, and care leavers), and ensure all individuals related to the hydrogen economy feel happy and supported in their work. Increased quality
of local work environment and opportunities will interest more people in careers within the sector, increasing competition for roles and pushing forward local skills and
knowledge development. Existing schemes within Moray that can be engaged with include DYW Moray and Moray’s Local Employability Partnership.
Developing
Future Talent:
Upskilling and
Training
Planning the transition from today’s workforce in Moray to the future workforce required for the ‘green revolution’ needs a clear development programme to ensure
specialist skills and knowledge are locally available. This includes succession planning to ensure local workers are aware and have access to appropriate re-training
opportunities to support their entry into hydrogen-related employment opportunities. This is particularly relevant for local workers currently operating in ‘fossil fuel’
related careers and roles. Existing schemes within Moray that can be engaged with include: DYW Moray, Moray First, and University of the Highlands and Islands.
Developed
Market
Awareness
Generally, businesses are not aware of the diverse opportunities related to hydrogen development. Local resourcing of any scheme will require an engaged and
competitive local market. Without this, schemes may have to look further afield for supplier and supply chain opportunities, meaning associated community benefits will
be felt outside of Moray. Any proposed scheme should look to run a series of general engagements with local businesses (e.g., meet the buyer events) to increase local
awareness of hydrogen technologies and associated business opportunities for organisations willing to engage. Existing schemes within Moray that can be engaged with
include Moray Chamber of Commerce and Skills Development Scotland.
Local Capacity
Building
Increasing awareness within local businesses of the opportunities related to hydrogen is one thing: suitably resourcing and accessing said opportunities is another.
Mentoring and upskilling sessions provided by specialists can help to grow local capabilities and skills, keeping benefits from the development within the local economy
and groups. Existing schemes within Moray that can be engaged with include Moray Chamber of Commerce and Skills Development Scotland.
Procurement
Methods
Any scheme should look to use the procurement process throughout the design, construction, and in-use of any hydrogen programme as an opportunity to embed
community benefit requirements within related supply chains. The use of contractual commitments around community benefits performance and delivery can ensure
that locally relevant positive impacts and community wealth are generated because of the work, directly in alignment with the local challenges identified in this report.
A connected and collaborative approach to community benefits across associated supply chains will support more effective and innovative approaches to social value
generation, through increased sharing of knowledge, opportunities, and best practice between stakeholders.
Community
Engagement
It is critical that any proposed scheme undertakes a detailed engagement programme with local communities to gain their insight on the scheme and help to ensure
community cohesion and acceptance of any proposal. It is important these communication paths are kept open throughout the lifecycle of the project, so project
stakeholders can ensure their approach to benefit generation remains aligned with local needs and challenges (as these won’t be static). This will ensure maximum
relevancy and value of benefits generated, potentially leading to greater community acceptance of any scheme as they will feel supported / benefiting from its local
presence. Existing entities within Moray that can be engaged with and provide support as the Hydrogen Economy is developed include tsiMORAY, Moray Council’s
Essential Skills programme, Volunteer Scotland, MORINFO and Moray Community Centres.
Table 9.3: Examples of partner organisations
Initiative Description
Page 105

Page 106

59  I  Mott MacDonald   |   Moray Hydrogen Strategy Report
9.4 Next Steps and Recommendations for Moray
Achieving community benefits for Moray and its people are not inevitable
outcomes from developing the hydrogen economy within the region. Due
planning, process and systems are needed to ensure that community
benefits are considered and embedded throughout the lifecycle of any
proposed scheme, if meaningful positive impacts are to be achieved.
Consideration Description
Social Value Charter
Any scheme looking to generate community benefits needs to have clear direction around ‘what’ community benefits they are trying to deliver, ‘why’ these are
relevant to local challenges within Moray, ‘how’ they are going to generate community benefits, and ‘who’ is responsible for delivering these benefits. A social
value charter can be used to set a clear and consistent approach to community benefit generation meaning all stakeholders engaged throughout the lifecycle and
supply chain of the proposed scheme are all working collaboratively towards shared goals. This will support more efficient and effective delivery of local community
benefits, maximising positive impacts in relation to social, economic and environmental wellbeing.
Social Value Delivery
Framework
Using a social value delivery framework, such as the model developed by Mott MacDonald, will support the measurement and management of community benefits
across the lifecycle of any proposed hydrogen scheme. These types of models typically capture performance data against targets and support the monitoring and
reporting process to evidence community benefit deliverables. For any proposed hydrogen scheme, it should be explored how associated frameworks can be
aligned to Moray Council and regional objectives around social, economic and environmental priorities, to best show how the scheme is addressing local challenges
and creating local benefits.
Monitoring
and Measuring
performance
Developing and embedding community benefits monitoring tools throughout any proposed hydrogen scheme will be critical for robustly and accurately measuring
the positive and negative impacts generated. Measuring should be aligned to specific targets, commitments and KPIs to ensure continued progression of benefits
throughout the lifecycle of the hydrogen scheme (including optioneering, design, construction, and in-use). Monitoring tools can also be combined with contractual
commitments around community benefits with the supply chain for designing, delivering, and managing the hydrogen scheme to support a more representative
understanding of the holistic impact of the scheme on local people and place.
Supply Chain
Engagement
It is noted that local businesses to Moray may not be aware of diverse opportunities related to Hydrogen. In line with this, it is recognised that at present, there is
likely to be limited market capacity and skills around some of the technical aspects and knowledge required for successfully delivering a hydrogen scheme. Any
proposed scheme can look to run meet-the-buyer events / other workshops with local businesses to increase awareness of the scheme and proposals, and the
associated benefits to their business. Mentoring and upskilling sessions provided by specialists can also be delivered to help grow local capability and skill, keeping
benefits from the development within local economy and associated groups. This support around local skills, training and business will allow for greater access
diverse thinking around the scheme, increasing potential opportunities around innovation within the scheme.
Monitoring tools can be combined with contractual supplier commitments around community benefits to support more connected and effective approaches to
benefits generation. These requirements should be aligned to the local challenges and opportunities outlined in this report to maximise the relevancy of impacts
generated. Supply chains are considered a ‘multiplier’ when it comes to social value generation, increasing the reach and resources available to deliver benefits.
Reporting
Regular reporting around benefits can help to keep stakeholders and suppliers accountable to commitments around benefits generation, ensuring targets are met
and opportunities maximised. In relation to Hydrogen schemes, owing to their relative infancy within the UK, robust and evidence-based reporting is critical for
maximising wider understanding of the opportunities related to the actual technology and the associated economic, environmental, and social wellbeing benefits
highlighted in this report. Reporting can help increase societal understanding and support of related schemes, acting as a catalyst for future investment and research
into associated solutions and trial programmes.
Communication and
Engagement
Engaging with communities to understand their concerns and gain their insight on the scheme can help to ensure community cohesion with any Hydrogen proposals.
It is recognised that generally there are concerns related to the security of hydrogen technologies and any impact there may be on local services. Detailed and
consistent engagement with communities around Moray throughout each step of the proposed scheme can help to ease tensions, capture diverse voices, improve
delivery against local needs, and maximise the overall ability of the scheme to deliver relevant and beneficial community impacts.
In line with this, we have identified 6 key recommendations for how locally relevant community
benefits can be maximised through any proposed Hydrogen scheme within the Moray region.
The table below outlines key components that could be considered when delivering hydrogen
schemes within the region to ensure targeted community benefits can be achieved and max-
imised, and could be considered when a Community Wealth Building strategy is created.
Page 106

Page 107

60  I  Mott MacDonald  |  Moray Hydrogen Strategy Report
9.5 Regional Profile – Moray
9.5.1 Social Wellbeing
9.5.1.1 Population
Latest estimates indicate that Moray has
a population of around 95,700 with an
even split between males and females.
Between 1998 and 2020, the population
of Moray increased by 10.3% which was
the 11th highest percentage change
out of the 32-council area of Scotland
(national average 7.7%). In terms of
overall size, the 45 to 64 age group is
currently the largest in the region, with a
population of 27,544. In contrast, the 16
to 24 age group was the smallest, with a
population of 9,019. However, even with
this weighting, the region does have a
younger age profile than the regional
average (dependency ration of 62.5 and
65.5 respectively). 61% of people within
Moray are considered in the ‘working
age’ population (16-64), which is lower
than the national average (63.9%).
9.5.1.2 Employment
77.4% of Moray’s population are
economically active, compared
to 76.1% in Scotland and 78.5% in
Greater Britain (see Figure 1 for
breakdown by occupation). In terms of
industries, Moray’s workforce supports
a significantly higher proportion
of positions within food and drink
manufacturing (10% compared to
Scotland average of 1.7%). In fact, 8.3%
of all those employed in food and
drink manufacturing in Scotland work
in Moray. This is driven by the fact
that there are several food companies
headquarters in the region (e.g.,
Baxters and Walker’s Shortbread) and
the largest concentration of whisky
distilleries in Scotland (over 55 sites).
In terms of other industries, around
8,000 people are employed in
engineering disciplines across the
region (including manufacturing,
construction, and utilities). Reporting
shows that electrical and mechanical
engineering skills are highly developed
in the local workforce. 17.1% of Moray’s
workforce is also employed within
manufacturing, which is considerably
higher than the Scottish average of
8.1%. A further 10% of the region’s
workforce are employed in relation to
Tourism. The latest predications show
a significant increase of 9% for the
local construction sector by 2028.
9.5.1.3 Unemployment
The unemployment rate in Moray
increased by 2.2% points between
December 2019-20 (latest data), which
is slightly below the increase across
the region (2.4%) and nationally (2.7%).
Importantly, the greatest recent growth
in unemployment was seen with youth
age groups, with a rate of 7.4% reported
at the end of 2020. This was below
the highland and Islands (7.8%) and
national (8.3%) rates, but still suggests
significant barriers for your people
wishing to enter the labour market.
9.5.1.4 Education
Moray has 45 primary schools and
8 secondary schools and in 2017
Moray Council had responsibility for
educating just over 11,900 pupils. In
2016/17 the eight secondary schools
produced 928 school leavers. Some
90.7% went on to further or higher
education or to gain employment.
90.7%
of pupils went on to further
or higher education or to
gain employment
Page 107

Page 108

61  I  Mott MacDonald   |  Moray Hydrogen Strategy Report 
9.5.1.5 Fuel Poverty
A household is said to be in fuel poverty
if it must spend more than 10% of its
income on fuel, to heat their home to a
satisfactory level. Latest figures estimate
that 34% of households within Moray
are in fuel poverty, with is significantly
above the Scottish average of 24%.
9.5.2.2 Business
Moray has a more traditional industrial
make up, with smaller businesses, slower
business growth, fewer opportunities
for young people to go into their
preferred sectors and a less developed
infrastructure to support business.
The location of Moray and its rural
nature has particular consequences for
the economic growth of the area. At
a national level, the north of Scotland
competes with the central belt to attract
new business and inward investment.
Situated between the Highland and
Aberdeen City / Aberdeenshire Council
areas, Moray also has competition
at a local level from its neighbours.
Moray’s close proximity to Aberdeen
places it at a significant economic
disadvantage: Aberdeen being
Scotland’s third largest city and also
the hub of the oil and gas industry.
Approximately 300 new businesses start
each year within Moray. Whilst there is a
considerably higher share of employment
in SMEs than seen nationally (61.7%
vs 50.6%), this is also significantly
below regional proportions (67.6%).
9.5.3 Life Sciences
Moray is emerging as a prime location
in research and development for the life
science and digital healthcare sector.
There are a number of strands of life
science activity emerging in Moray.
The area has a growing reputation
in developing digital and online
technologies to improve service delivery
and efficiency. Although these strands
have emerged independently, they
are complementary and have arisen
because of the unique health ecosystem
which puts Moray in a strong position to
develop, pilot and test comprehensive
digital healthcare models.
Leading edge digital health solutions
are being developed in the Moray area,
strengthened by a growing cluster
and critical mass of activity along the
A96 Inverness to Elgin “corridor”,
which can now be seen as one of the
world’s first true digital healthcare
clusters. Comprising of more than 40
organisations including, Nongovernment
Organisations, health boards,
academia and commercial companies
such as OpenBrolly, who designs
healthcare apps for mobile devices
and international IT company Atos,
both of which are located at the EPF.
9.5.2 Economic Wellbeing
9.5.2.1 Economy
Latest figures show a significant
drop in GVA within Moray from
2019-20, with a fall in 12.6%. Across
Moray, manufacturing (down £118m),
Construction (down £31.4m) and whole
& retail (down £29.5m) are considered
the most at-risk sectors in terms of
absolute figures. Both the pandemic
and Brexit are seen as key drivers of
uncertainty and falling performance
across most industries in the area.
34%
of households within Moray
are in fuel poverty
Page 108

Page 109

62  I  Mott MacDonald   |  Moray Hydrogen Strategy Report 
9.5.4 Engineering, Production
and Manufacturing
Moray is a natural location to establish
an engineering business to support
the oil and gas and renewable energy
sectors. With its long history as an
engineering and fabrication base
for the oil and gas and distillation
industries it is perfectly placed for
diversification into the renewable
energy supply chains. Electrical and
mechanical engineering skills are highly
developed in the local workforce,
including those making the transition
from armed forces to civilian life.
The area has a track record in military
aerospace. Through the Moray Growth
Deal, it is planned to construct a Moray
Aerospace, Advanced Technology
and Innovation Campus (MAATIC).
The MAATIC will provide a leading role
in generating innovative ideas and will
be a catalyst for research and sharing of
ideas and knowledge. Alongside this
development, the Manufacturing
Innovation Centre for Moray, will be
co-located on the Lossiemouth site
and provide support for existing and
new manufacturing businesses.
The strengths of engineering and
the strategy to diversify the benefits
of the oil and gas industry around
Scotland put Moray in a prime
position as a great place to invest.
9.5.5 Environmental Wellbeing
9.5.5.1 Biodiversity
Much of the uplands of Moray lie
within the Cairngorms National Park,
while on the coast there are nature
reserves of national and local status.
Red deer are frequently encountered
in herds in the higher and more remote
parts of Moray. Its smaller cousin the
Roe inhabits more low-lying areas.
Foxes and badgers are abundant,
whilst much rarer the wildcat and
pine marten have a hold in Moray.
Indigenous Red squirrels however still
survive in reasonable numbers. But
perhaps the most celebrated mammal
is the bottle-nose dolphin, a colony of
around 130 live in the Moray Firth.
Grey and common seals are relatively
common offshore. Findhorn Bay is
a staging post for many thousands
of migrating wildfowl and waders in
winter and during the summer is a
reliable spot to observe Osprey.
9.5.5.2 Climate Change
and Carbon Emissions
The effects of a changing climate are
already beginning to be seen in Moray
with increasingly frequent severe
weather events requiring responses
from the council, the emergency services
and Community Planning Partners.
Relevant impacts of climate change
for Moray include food supply security,
increased risk of droughts, increased
risk of flooding and rising sea levels.
With respect to CO2 emissions within the
scope of influence of Local Authorities,
as defined by the Department for
Business, Energy & Industrial Strategy,
per capita emissions of Moray are
the highest of any Local Authority in
Scotland. This is attributable in large part
to Industry and commercial emissions
per capita, 7.9t CO2 per person,
compared to the Scottish average of 4.9t
CO2 per person, and more specifically
– the consumption of gas. These high
relative emissions are assignable to
Moray’s whisky distilling sector, food
producers and two MOD military facilities.
9.5.5.3 Living Environment
Inverness Airport is only 40 minutes
away and Aberdeen Airport is
approximately a 90-minute drive
from Elgin. Moray has better air
connections than most UK locations
with 138 flights per week, including
35 flights to London airports and a
daily connection into the international
hub of Amsterdam. Every major UK
city can be reached within a day.
There are over 40,000 households in
Moray, with the average price of a home
within the region sat slightly higher than
the national average. The Council’s
Housing stock is an essential component
of the local economy, particularly in its
role of attracting, or retaining people
in jobs, but also in the continuity of
construction and maintenance work.
Page 109

Page 110

63  I  Mott MacDonald  | Moray Hydrogen Strategy Report
9.6 Regional and National
Hydrogen Capacity
9.6.1 Scotland
Scotland has a key role to play in
the development of a UK hydrogen
economy, with the potential to produce
industrial-scale quantities of hydrogen
from offshore and onshore wind
resources, wave and tidal power, as
well as with Carbon Capture Usage
and Storage – supported by a strong
company base and valuable skills and
assets in oil and gas, offshore wind,
and energy systems. Economic analysis
for the Scottish Government suggests
that Scotland could deliver 21-126TWh
of hydrogen per year by 2045, with up
to 96TWh of hydrogen for export to
Europe and the rest of the UK in the
most ambitious scenario, delivering
significant jobs and local economic
benefits. The Scottish Government
published a Hydrogen Policy Statement
in December 2020, which set out
their vision for the development of a
hydrogen economy in Scotland and
ambitions for renewable and low carbon
hydrogen generation. A Hydrogen
Action Plan will be published later this
year, supported by a £100m programme
of investment from 2021 to 2026.
9.6.2 United Kingdom
The UK is well positioned to be a
world leader in low carbon hydrogen
production and use and has made
significant commitments and funding
available to achieve this. Recent
government press releases (August 2021)
present a vision to kickstart the country
as a world-leading hydrogen economy,
with growing demand in recent years.
This in part has been driven by national
commitments around decarbonisation
across the economy in line with net-zero
requirements. However, at the core
of the UK’s commitment around low
carbon hydrogen production and use,
is the recognition of the wider socio-
economic benefits that this transition
can bring. Growth of hydrogen markets
could potentially create up to 100,000
new green jobs within the UK and
generate £13billion of GVA through the
national economy by 2050, directly
supporting sustainable development
and growth across regions. By 2030,
hydrogen could play an important role in
decarbonising polluting, energy-intensive
industries like chemicals, oil refineries,
power and heavy transport like
shipping, HGVs and trains, by helping
these sectors move away from fossil
fuels. Low-carbon hydrogen provides
opportunities for UK companies and
workers across our industrial heartlands.
It is recognised that the UK can only
realise these economic opportunities
if action is taken to put in place the
necessary support and environment to
develop robust supply chains, upskill
people and secure high-quality jobs,
and lay the groundwork to unlock
investment and export opportunities. 
9.7 Case Studies
9.7.1 Tees Valley
The Tees Valley produces more than
half of the UK’s commercially available
hydrogen and is home to a range
of multi-national companies as well
as other supply chain companies
in the region. Hydrogen is used
mainly in the conversion of heavy
petroleum fractions and production
of Ammonia, together with other uses
across multiple industrial sectors.
The Tees Valley Hydrogen Innovation
Project (TVHIP) aims to support SMEs
in the Tees Valley to develop new
business networks, products, and
processes through the development
of a hydrogen low carbon economy.
Financially supported through the
European Regional Development
Fund (ERDF), the project offers a
minimum of 12 hours of fully funded
support to eligible SMEs*.
Page 110

Page 111

9.7.3 Orkney Island: BIG HIT Project
BIG HIT (Building Innovative Green
Hydrogen Systems in Isolated
Territories) is a six-year, Orkney based
demonstration project which aims to
create an integrated low carbon and
localised energy system establishing
a replicable model of hydrogen
production, storage, distribution and
use for heat, power and transport.
The learning from BIG HIT about
the benefits of using hydrogen
with renewable energy sources in
the Orkney Islands will support the
much wider replication and further
deployments of renewable energy with
fuel cell & hydrogen technologies in
isolated or constrained territories.
9.7.4 The Green Distilleries
Competition
Eleven distilleries across Scotland and
a further six in England will be able to
kick-start green innovations thanks
to the government backing, helping
them harness energy sources such
as low-carbon hydrogen, biomass
and repurposed waste to power their
operations. The successful distilleries
will receive between £44,000 and
£75,000 in the first phase of funding
(£10mil total), helping them boost
decarbonisation research and
development, with schemes including
the use of hydrogen and biofuel
boilers and geothermal energy in their
production processes. The funding
will help prevent pollution equivalent
to taking 200,000 cars off the road.
In 2019, the UK distilleries industry grew
by 20%, highlighting the opportunity
for the sector to be at the heart of
the UK’s green and resilient recovery
from coronavirus. The Scotch whisky
industry supports 40,000 jobs across
the UK, with more than 10,000 people
directly employed in Scotland. With
7,000 of these jobs in rural Scottish
areas, this funding will drive forward
support for net-zero innovation in
some geographically remote parts
of the UK, creating more jobs and
skills and providing opportunities
for distilleries to develop their fuel
transportation and storage technologies.
9.7.2 Northern Gas Networks
– Winlaton, Gateshead
The HyDeploy project is blending
hydrogen with natural gas on a public
gas network in Winlaton, Gateshead
operated by Northern Gas Networks.
Heating in the UK is currently responsible
for a third of carbon emissions. Because
hydrogen produces no carbon at the
point of use, it is a viable alternative
for heating homes and businesses to
achieve the Government’s target of
Net Zero carbon emissions by 2050.
In a ten-month long pilot, HyDeploy is
now blending up to 20% of hydrogen
(by volume) for 668 homes and
a primary school in Winlaton.
Customers are continuing to use their
gas supply and appliances as normal,
without any changes needed to gas
appliances or pipework as current gas
appliances are designed to operate
with a blend of up to 23% hydrogen.
Most participants reported little
disruption both prior to and during
the trial and valued the feeling of
contributing to climate action without
needing conscious effort. Some
participants viewed the trial and their
(and Keele University’s) involvement in
an extremely positive light, going beyond
just acceptance of the trial to expressing
excitement. Such positive reactions
may be linked to pride in a place to
which they feel attached, or the ‘halo’
effect of making a positive contribution
as an individual (or organisation).
7,000
people emplyed in rural Scottish
area within Scotch whisky insdustry
Page 111

Page 112

65  I  Mott MacDonald  I  Confidential | Moray Hydrogen Strategy Report DRAFT Moray Hydrogen Strategy Report DRAFT  I  Confidential | Mott MacDonald | 65
10. Hydrogen
Strategy for Moray
Moray is a natural location to establish a hydrogen
economy and develop wider green technologies to
support Scotland’s renewable energy supply chain.
Page 112

Page 113

66  I  Mott MacDonald  | Moray Hydrogen Strategy Report
10.1 Introduction
There are significant opportunities,
set out in this Hydrogen Strategy, to
generate local community benefits
in relation to social, economic, and
environmental wellbeing. These
opportunities align with the Council’s
net-zero targets with recognised benefits
associated with the green transition.
The Hydrogen Strategy action plan
identifies the short-, medium-, and
long-term actions required to develop
a hydrogen economy for Moray and to
generate local community benefits.
The stakeholder analysis has shown
that there is a significant interest in
using hydrogen as a fuel in the Moray
area and the demand analysis has
shown the potential growth, given
the right economic conditions.
10.2 Scope Summary
10.2.1 Government Policies
The Scottish Government Hydrogen
Policy Statement, published December
2020, sets out Scottish Government
support for the strategic growth of a
strong hydrogen economy in Scotland.
The Minister for Energy, Connectivity,
and the Islands provides the following
vison in the ministerial forward:
“Our vision is for Scotland to become
a leading Hydrogen Nation in the
production of reliable, competitive,
sustainable hydrogen and secure
Scotland’s future as a centre for
international excellence as we establish
the innovation skills and supply chain
that will underpin our energy transition.
Scotland’s unique selling points, are its
natural resources, infrastructure and
skilled energy workforce which enable
us to become the producer of lowest
cost hydrogen in Europe by 2045.” Hydrogen has a role to play across
Scotland in our islands and rural
communities, cities and industrial
clusters, and strategies for its
production and application are
expected to vary across these
geographic regions. We are committed
to realising the benefits of hydrogen
to our regions and local communities
and so will support regional hubs of
hydrogen activity across Scotland,
recognising the differing resources,
strengths and focuses of each location.
The Scottish Government Draft Hydrogen Action Plan,
published November 2021, sets out the actions for the next five
years to support the development of a hydrogen economy. The
Cabinet Secretary for Net Zero, Energy and Transport includes
the following statement as part of the ministerial forward:
Page 113

Page 114

The UK and Scottish Governments are
committed to realising the benefits
of hydrogen to our regions and
local communities and will support
regional hubs of hydrogen activity.
Government funding and resources are
available to support hydrogen projects
and technologies within Moray.
10.2.2 Opportunities for Moray
There is an opportunity for Moray
Council to develop a Hydrogen Economy
and retain significant benefits within
Moray. The prevalence of off-shore
and on-shore renewable energy
production and the potential for this
to be increased offers Moray the
opportunity to produce green hydrogen.
The development of Hydrogen Economy
within Moray will bring many benefits to
the region including inward investment,
creation of new opportunities and
jobs, retention and development of
young persons in Moray. Further work
is required to determine the GVA;
however, it is expected to be significant. 
10.2.3 Hydrogen Demand in Moray
There is a clear demand for Hydrogen
in Moray. The largest potential users
for hydrogen are the distilleries and
domestic properties in the medium
to long term, however in the short
term expected demand is from road
freight trials including HGVs, buses,
refuse vehicles and other council
vehicles and grid blending make up
the majority of the total projections.
10.2.4 Hydrogen Corridor
through Moray
There is an opportunity to create a
Hydrogen Corridor through Moray
by considering a hydrogen refuelling
stations along the route of the A96.
Keith (near Blackhillock) offers a
location approximately halfway
between Aberdeen and Inverness.
It is also important to consider the
transport movements from A95
towards the Central Belt, primarily
from the whiskey industry, and a
fuelling zone along this corridor.
Engagement with The Highland
Council, Aberdeenshire Council and
Aberdeen City Council will be required
to review and agree the best way for a
hydrogen corridor to be developed.
10.2.5 Key partners and
Funding Opportunities
Key Partners for Moray will be HIE;
Scottish Enterprise; Renewable
Energy Developers (e.g. Ocean
Winds); Scottish Gas Networks; Moray
Chamber; the wider whisky industry
(i.e. distilleries, transport logistics,
raw material suppliers etc); and, other
industries and public sector bodies
with larger HGV type vehicles.
A selection of the funds that may be
applicable for supporting the introduction
of a hydrogen economy in Moray are
provided in the table on the right:
Fund Value Notes
Just Transition
Fund £500m For North East
and Moray
Energy
Transition Fund £62m
Energy
Technologies
Fund
(Hydrogen)
£100m
Scottish Zero
Emission Bus
Challenge
Fund
£50m
Low-Carbon
Manufacturing
Challenge
Fund
£50m
Green Growth
Accelerators
Programme
(local
authorities)
£200m
Public and
private
investment
Green
Jobs Fund
(Enterprise
Agencies)
£100m
Table 10.1: Available Funds to support
a Hydrogen Economy
Page 114

Page 115

10.2.6 Key Stakeholders
Most stakeholders engaged as part of
this study were very positive towards
Hydrogen. It was felt that Hydrogen (in
particular Green Hydrogen) can form
part of the solution to achieve net-zero
and the time to act is now. A significant
number of stakeholders would like to be
involved in the next steps and to assist
Moray Council in developing a Hydrogen
Economy for the benefit of Moray.
There will be a number of challenges
to take this forward. A collaborative
approach is required to take forward and
maximise this opportunity for Moray.
10.2.7 Role of Hydrogen
in Moray’s future
The work carried out to date provides
confidence that Hydrogen can play a
significant role in Moray’s transition to
a low carbon future and through the
development of a hydrogen economy
within Moray, allow for creation of
new jobs and opportunities.
As part of short-term actions,
consideration needs to be given to the
skills and training that will be required
to support the development of the
hydrogen economy. As well as increasing
knowledge and promoting the industry
within schools, engagement with further
education establishments is required to
create education programmes to develop
the skills and knowledge required locally
to support the Hydrogen Economy.
10.2.8 Key Interventions
Initial interventions (pilots) have
been identified at the following
locations for the short-term:
• Lossiemouth
• Aberlour
• Buckie Harbour
• Elgin
Depending on the success of the
pilot project(s), these interventions
may be expanded to suit medium-
and long-term demand.
Further interventions have been
proposed at the following locations
for the medium- and long-term:
• East of Portsoy (Caledonia
Off-Shore Windfarm)
• Blackhillock
10.2.9 Proposed Locations and
Infrastructure Requirements
The order of magnitude costs for the
proposed electrolysers and hydrogen
infrastructure are shown in Table 10.2.
Further work is required to determine the
exact site locations and to optimise the
size and scope of the facilities required.
Electrolyser
Size MWe
Cost Estimate
(Electrolyser
and Storage)
Notes
2.3 £3.7m
Pilot project,
suitable for
Lossiemouth,
Aberlour,
Buckie, and
Elgin.
65 £82m
130 £134m
300 £339m
Po tential
long term
hydrogen
production in
Moray.
Table 10.2: Hydrogen infrastructure costs
Additional Costs:
• A 1000kg / day Hydrogen
Refuelling Station will cost
approximately £1.6m per station.
• Tube trailer loading facilities for the
distribution of hydrogen, including tube
trailers will cost approximately £3.6m.
A 2.3MW electrolyser, producing 1000kg
/ day of hydrogen, complete with a
Hydrogen Refuelling Station would
cost approximately £3.7m + £1.6M =
£5.3m excluding land costs. This size
is suitable for a pilot project to initiate
the hydrogen economy in Moray.
Page 115

Page 116

69  I  Mott MacDonald  I  Confidential | Moray Hydrogen Strategy Report DRAFT Moray Hydrogen Strategy Report DRAFT  I  Confidential | Mott MacDonald | 69
Page 116

Page 117

70  I  Mott MacDonald  | Moray Hydrogen Strategy Report
10.4 Short Term Actions
10.4.1 Immediate Actions
1.
Consider how Moray Council wish
to take forward the development of
a Hydrogen Economy within Moray
– whether as a supporting facilitator
of development by others or leading
the development. The latter could be
through an arm’s length company or
directly as the Council. This would allow
Moray Council to have more control as
the economy is developed and allow
the generated wealth to be retained
and re-invested in Moray in line with
key aims/objectives of Moray Council.
2.
It may be that in the short-term and to
maintain momentum, it is led by Moray
Council whilst the longer-term solution
is worked through and developed.
Things to consider include:
• Expanding the current team
to coordinate and maximise
funding opportunities, economic
activity and investment.
• Development of a robust
Organisation structure
• Website and promotion of Hydrogen.
3.
Develop enhanced relationships with
key partners and adjacent Councils.
Establish a hydrogen steering group
encompassing organisations such as
HIE, Moray Chamber, UHI Moray, key
industries (potential suppliers and users),
Hydrogen experts and renewable energy
developers as well as Moray Council.
The role of the steering group would
be to take ownership to drive forwards
the development of a hydrogen
economy bringing together key
stakeholders and industry partners.
Through working groups and
bringing in relevant members of the
hydrogen stakeholder network, the
steering group needs to get buy-
in and commitment from industry
(suppliers and users) to work together
to develop a hydrogen economy in
Moray for the benefit of Moray. The hy-
drogen strategy will be reviewed every
three years as a minimum and revised as
required.
The steering group needs to be a
focused group with the empowerment,
desire and ability to progress actions and
maximise the hydrogen opportunities
that are available for Moray.
Page 117

Page 118

71  I  Mott MacDonald  | Moray Hydrogen Strategy Report
6.
Promotion and knowledge development
of Hydrogen within schools. Engagement
with further education establishments
is required to create education
programmes to develop the skills
and knowledge required locally to
support the Hydrogen Economy.
5.
Investigate funding opportunities (for
example, the Just Transition Fund)
and apply for initial funding to fund
a dedicated team to develop the
Hydrogen Economy opportunities,
allow further development of pilot
project opportunities (feasibility, design
development etc.), develop one (or
more) pilot projects (installation) and
then review and assess the success
of the pilots and identify/plan the
hubs that will be required to meet the
medium- and long-term demands.
7.
Set up, fund and initiate / deliver at
least 1 pilot project to generate interest
and demand. This will also stimulate
the economy, test the infrastructure,
provide opportunities for learning
and increased confidence and surety
on the way forward for Moray.
4.
Establish a hydrogen stakeholder
network in Moray. This needs to include
community and education groups as
well as industry. From the stakeholder
engagement carried out as part of this
study, there is a lot of enthusiasm for a
hydrogen economy within Moray and
a desire from many groups (distilleries,
transport, large and small businesses,
public services, and community groups)
to be part of this as it develops.
It is important that community groups
are involved and that community wealth
building, social value and removing
fuel poverty are front and centre of the
hydrogen economy. This means keeping
as much of the economy in Moray for
investment and jobs. It also needs to
be recognised that in the short and
medium term, energy will be expensive.
Page 118

Page 119

72  I  Mott MacDonald  |  Moray Hydrogen Strategy Report 
10.4.2 Pilot Projects
Whilst we have assessed six potential
hydrogen hub locations as part of
this study, not all are suited to be
taken forward as pilot projects.
From the potential locations assessed as
part of this study, we have identified four
potential pilot projects. The table on the
right summarises each of the projects
and their benefits and constraints.
We provide further rationale behind
each of the potential pilot projects
within Section 6.2 of the report.
The pilot project(s) taken forward will
take of the order of three years to be
implemented. The current lead time
for an electrolyser is approximately 18
months. Depending on the location of the
pilot, time will be required for approvals
(Planning, SEPA) as well as construction
of the associated infrastructure.
It should be noted that this is very much
high level and further assessment of
each is required to allow a determination
on the project or projects that offer
most value to Moray in the short-term
to be taken forward as pilot projects.
Project/Hub Name Benefits Constraints
Lossiemouth
• Close to Elgin
• Access to MOD/RAF solar power at
potentially a reduced cost
• MOD/RAF are a potential partner
• Close to future solar farms
• Access to grid power
• Option to extend within MoD land.
• Solar power is insufficient for hydrogen at scale
• Grid power may be high cost
• May not be suitable for significant expansion
due to power availability and location
• Located 6 miles from A 96
• Limited HGVs in vicinity compared with other locations.
• May need to supplement initial supplies with import.
Aberlour Hub
• Access to onshore wind power
• Close to local transport fleets
• Could drive demand from nearby
industrial users (i.e. distilleries)
• Can be expanded to meet growing
industrial demand
• Good location to distribute hydrogen to
transport refuelling sites throughout Moray
• Distilleries and transport logistics
companies keen to support.
• Benefits depend on wind power supply agreements
• Potential land issues
Buckie Harbour
• Social benefits for investment in Buckie Harbour
• Grid power available, possible access
to offshore wind power
• Can drive demand from offshore crew
transport vessels and local transport fleets
• Located near potential industrial users (maltings)
• Could form part of the Buckie Harbour
Masterplan development.
• Grid power may be high cost
• Distance from road transport and
other industrial users in Moray
Elgin
• Close to council fleets and local transport
• Excellent location to distribute hydrogen to future
transport refuelling stations throughout Moray
• Set up could be “rolled out” in locations with
similar initial hydrogen demand - e.g. Forres
• Could tie-in with HGV parking
• Grid power may be high cost
• May need to supplement initial supplies with import.
Table 10.4.2: Hydrogen Proj ects
Page 119

Page 120

73  I  Mott MacDonald   |  Moray Hydrogen Strategy Report 
10.4.3 Short Term –
Beyond pilot projects
The intent in the short term is to
generate hydrogen at a small scale in
Moray. Once the pilot project(s) is up
and running, there should be ongoing
assessment of the pilot to determine
whether the pilot location is appropriate
for the medium and long term.
In the short-term up to 2030, the
organisational vehicle that will drive
forward the Hydrogen Economy
within Moray needs to be set up and
empowered to plan for the medium
term and begin implementing actions
so that by 2030, Moray is in the
right place the expand the supply
to meet the increasing demand.
Project/Hub Name Benefits Constraints
East of Portsoy
(Aberdeenshire)
– Caledonia Wind
Farm
• Access to low-cost offshore
wind power (from 2032)
• Significant energy
available (300MW)
• Distance from road transport
and industrial users in Moray
• Location still to be
confirmed but is likely to
be outside Moray and
therefore potentially outside
scope of this study
Blackhillock (Keith)
• Access to low cost onshore
and offshore wind power
• Access to grid power
• Close to local transport fleets
• Could drive demand from
nearby industrial users
• Can be expanded to meet
growing industrial demand
• Good location to distribute
hydrogen to transport refuelling
sites throughout Moray
• Benefits depend on wind
power supply agreements
• Potential land issues
Table 10.4.2: Hydrogen Proj ects
10.5 Medium-Term (2030
to 2040) Aims
Brief description/summary of medium-
term demand and opportunities.
In the medium-term the key aim will
be to grow the hydrogen supply in
Moray by expanding the installed
electrolysers, distributing hydrogen
to a network of hydrogen refuelling
stations and industrial users, in a hub
system use road-based tube trailers.
The significant increase in demand
occurs during the medium term and
there is the opportunity to utilise offshore
wind power (e.g. Caledonia Wind
Farm) to expand hydrogen production
based on offshore wind power.
From the potential locations assessed
as part of this study, we have identified
two hub projects that could be
developed in the medium term. This
would be alongside the expansion of
one or more of the pilot projects.
The table below summarises each of
the projects and their benefits and
constraints. We provide further rationale
behind each of the potential pilot
projects within Section 6.2 of the report. 
By early in medium term, there should
be an aim to have developed a network
of hydrogen refuelling stations. This
will allow new HGVs and large-vehicle
fleets to be hydrogen fuelled. For
industry, the supply will need to be in
place and proven to allow the financial
commitment of a complete switch
to hydrogen vehicles to occur.
Aims would include:
• Identify Funding and Investment
to drive the Hydrogen Economy
• Develop and expand demand
• Review and assess the pilot
project(s)
• Identify and confirm hydrogen
production and refuelling locations
• Commence procurement of
hydrogen production facilities
• Consider supporting community
renewable projects that could
be subsequently developed as
small-scale hydrogen hubs in the
future as costs reduce.
Page 120

Page 121

In addition, it is the current SGN
policy that the SGN gas network will
be repurposed during this timeframe
to provide heating for homes using
hydrogen with delivery by pipeline.
Therefore, towards the end of
2030s, there is a strong likelihood for
hydrogen to be used for domestic heat
alongside other energy sources.
10.6 Long-Term (2040
onwards) Aims
The long-term will be primarily about
the continued hydrogen production in
Moray and deliver/receive hydrogen
to/from national hydrogen pipeline
network. The hydrogen economy
will be fully developed and net zero
achieved through this and other
renewable energy sources.
In this period, there should be
consolidation of the hydrogen
production facilities within Moray
and identification of opportunities for
the further expansion and growth of
the hydrogen economy in Moray. 
From 2040 onwards as technologies
improve and bring down costs, there
is the potential for the development
of smaller scale community projects
(particularly for areas that are “off-
grid”). As well as allowing energy to be
created and used at source, it creates
increased resilience within the energy
network and offers the opportunity for
communities to be self-sustaining.
Throughout much of the medium
term, there should be widespread
use of hydrogen for large-vehicle
transport within Moray.
In addition to vehicle demand, there
will be a need to develop industrial
use for hydrogen for heating. As with
the pilot projects and their immediate
focus on vehicles, trials will be required
to test and prove the technology.
Depending on the further opportunities
for renewable energy generation within
Moray, there would be the option to
supplement local supplies by bringing in
hydrogen from Inverness or Aberdeen/
Aberdeenshire. This should be looked
at as part of the regular re-evaluation
of the economic case for hydrogen.
Page 121

Page 122

Opening opportunities
with connected thinking.
mottmac.com
Page 122

Page 123

Appendix 2
Just Transition Fund: Call for year one projects
Expression of Interest 
Summary of Proposal
Moray Hydrogen Pilots 
To support the development of a hydrogen economy within Moray. Moray Council and its
partners are seeking to obtain Just Transition Funding and submit this multi-year bid.
In 2022/23 there will be a feasibility study to develop the pilot projects in the Moray
Hydrogen Strategy including:
• Feasibility designs to determine preferred pilot project(s) – locations, size, details
etc.
• Feasibility work on conversion of Moray Council vehicle fleet to Hydrogen
• Set up Hydrogen Working Group. Grow interest in Moray Hydrogen, attract
private investment to develop.
The outcome of the feasibility work will result in future years bids towards delivery of the
hydrogen strategy. Pilot projects include opportunities in Lossiemouth, Buckie, Aberlour,
Blackhillock and Elgin. It is intended that this bid will complement the Just Transition bids
for Buckie Harbour and Blackhillock Masterplan by exploring the feasibility of pilot
projects in these areas. The draft Hydrogen strategy is attached. 
Developing a hydrogen economy in Moray during the short to medium term, including
connecting into adjacent areas, could contribute to a reduction in greenhouse gases and
particulate emissions, improve security of energy supply, contribute towards the
decarbonisation of transport, increase and make better use of renewable energy
generation, and could help address fuel poverty issues, particularly in rural areas.
Eligibility Criteria Achieved
Organisation Headquartered and project benefits
in area
Yes, the bid is being led by Moray
Council. All project activity will be
based in Moray. The majority of
benefits from the project will be
realised within Moray.
Registered Charity / Business / Public Sector  Public sector
Positive Impact on Decarbonisation and
efficiencies Just Transition Outcome
Yes, this bid will be able to deliver
against a number of the Just
Transition Outcomes and will deliver
on the Scottish Government’s
decarbonisation and energy
efficiency goals.
Item 7c)
Page 123

Page 124

Appendix 2
Spend in financial year 22/23 Yes, £80k
Matched funding costs and pilot project
definitions
Consultants will be employed to carry
out the work given its specialist
nature
Alignment with Impact objectives
• Ensure that the investment is targeted in such a way that can create good, green
jobs now and throughout the transition to net zero 
Developing a hydrogen economy will provide the opportunity to create new, high-quality
jobs within Moray in a sector based on sustainable resource management and protection.
Not only can this help to alleviate current challenges within Moray around
unemployment, but the provision opportunities within this high-growth, environmentally
conscious space may help to attract more young-people to live and stay in Moray.
• Ensure communities directly benefit from the Fund, including through the ability to
decide on and drive spend
The creation and development of a hydrogen economy within Moray offers the
opportunity to empower and invigorate communities whilst strengthening the local
economy.
• Work in partnership with the private sector, especially shaping opportunities to
crowd in private sector finance
As hydrogen can be produced locally from several sources within Moray (e.g. off-shore
and on-shore wind), developing capacity will help to diversity the local market and
support the transition to a sustainable, low-carbon economy and related jobs (in high-
value areas). It is also recognised that a hydrogen scheme of this nature is likely to bring
greater interest from outside investment, supporting and increasing local economic
activity.
Investment in hydrogen technology can bring about jobs and continued advancements in
every industry touched by it. For Moray, this can help to future-proof existing markets,
jobs and businesses, whilst also providing a new space for local capabilities to develop
into. This will help to foster innovation within existing businesses and industry processes,
supporting a wider transition within the region to more sustainable and green ways of
working. For those local organisations and people engaged with the proposed scheme,
owing to the relative infancy of hydrogen technologies globally (but increasing interest),
there is the added benefit of being able to position themselves and access opportunities
as they develop within domestic and international markets.
• Collaborate at a local and national level on the decisions that impact the North East
and Moray
Page 124

Page 125

Appendix 2
Progressing the Moray Hydrogen economy and the hydrogen strategy will enable Moray
to link in with Aberdeenshire and Aberdeen City to supply locally produced green
hydrogen to initiate local projects in line with the national strategy to promote hydrogen.
Proposal
(to demonstrate evidence against criteria outlined below)
Demonstration of alignment with the impact objectives
Moray Council and their partners want to create a hydrogen economy to achieve the
benefits by developing a Hydrogen Strategy and Action Plan which explores the use of
green hydrogen to help achieve this. The Council recognises that Hydrogen could have a
key role in providing an alternative energy to fossil fuels.
The development of a hydrogen economy within Moray will bring many benefits to the
region including inward investment, creation of new opportunities and jobs, retention
and development of young persons in Moray. Inward investment in the hydrogen supply,
demand and infrastructure within Moray offers a sustainable economic growth
opportunity with a positive impact on reducing poverty.
Moray has access to significant sources of green renewable power including offshore and
onshore wind farms which, subject to contract, could create the conditions required to
produce green hydrogen within Moray at scale.
The draft Moray Hydrogen Strategy prepared by Mott MacDonald clearly demonstrates
that there is a demand for Hydrogen within Moray and the opportunity to produce
hydrogen within Moray. The draft Strategy also outlines a number of key steps to realise
this opportunity. This project will implement these steps and assist in developing Moray’s
Hydrogen Economy that will be truly transformational, not only for Moray but for the
North-East of Scotland and beyond.
Year Step Task Summary Total
Approx.
Cost (£M)
22/23 Feasibility Designs for Pilot
Projects
Feasibility designs to
determine preferred pilot
project(s) – locations, size,
details etc. 
Feasibility work on
convertion of Moray Council
vehicle fleet to Hydrogen 
Set up Hydrogen Working
Group. Grow interest in
£80,000
Page 125

Page 126

Appendix 2
Moray Hydrogen, attract
private investment to
develop.
23/24 Complete designs, land
agreements etc, and look to
Implement preferred pilot
project(s) 
Start conversion of Moray
fleet and purchase hydrogen
to meet  this demand
Undertake design for
preferred pilot(s). Carry out
land agreement, place orders
for electrolyser and long lead
items. 
Potential purchase of
hydrogen from Aberdeen to
allow pilot(s) for Moray
Council vehicle fleet to be
operational as early as
possible. 
Start conversion of Moray
Council vehicle fleet to
Hydrogen.
The
outcome of
the
feasibility
work will
result in
future years
bids
towards
delivery of
the
hydrogen
strategy
24/25 Implement preferred pilot
project(s). 
Continue fleet conversion for
Council and other public
bodies
Purchase remaining
infrastructure. Construct the
pilot project(s) and produce
hydrogen. 
Continued conversion of
Moray Council vehicle fleet
to Hydrogen. Liaise with
other public bodies to
encourage wider conversion 
25/26 Explore feasbility and timing
to scale up pilot project(s) or
support creation of new
Hydrogen Hubs. 
Continue public fleet
conversion
Building on ongoing further
design works to scale up
hydrogen hubs. Assist in
development of other
hydrogen hubs using private
investment. 
Continued conversion of
Moray Council vehicle fleet
and other public sector fleet
to Hydrogen. 
Page 126

Page 127

Appendix 2
26/27 Development of Hydrogen
Hubs within Moray – design
works and commence
implementation,
infrastructure procurement
etc.
Infrastructure procurement
for new or expanding
hydrogen hubs. 
Continued conversion of
Moray Council vehicle fleet
and other public sector fleet
to Hydrogen. 
The type of funding requested and indicative timeline for delivery, including high level
annual timelines if a multi-year proposal.
£80k Capital – feasibility for future development and investment.
The outcome of the plan will result in future years bids towards delivery of some aspects
of the plan, the plan itself will identify costings for proposal together with future
maintenance costs for the authority.
By undertaking the initial works to develop the hydrogen economy, Moray Council will be
able to ensure that it develops in a coordinated and collaborative manner and that
moving forwards, the wealth and benefits generated are, to the greatest possible extent,
retained within Moray for the benefit of Moray.
A major strength in developing localised energy systems is that the system can be built
around the relevant local resource and can closely match and deliver energy to the end
user when required. It is also expected that regional development of renewable energy
sources will provide more economically viable fuel sources for hard-to-reach areas,
reducing current ‘pockets’ of deprivation seen across many rural areas. Shifting away
from fossil fuels is an opportunity to build a fairer and more equal society throughout
Moray that removes existing pockets of deprivation (e.g., rural areas).
Developing a Hydrogen economy in Moray during the short to medium term, including
connecting into adjacent areas, could contribute to a reduction in greenhouse gases and
particulate emissions, improve security of energy supply, contribute towards the
decarbonisation of transport, increase and make better use of renewable energy
generation, and could help address fuel poverty issues, particularly in rural areas.
Scalability: If the hydrogen economy in Moray is developed and as technologies improve
and bring down costs, there is the potential for the development of smaller scale
community projects (particularly for areas that are “off-grid”). As well as allowing energy
to be created and used at source, it creates increased resilience within the energy
network and offers the opportunity for communities to be self-sustaining. 
Page 127

Page 128

Appendix 2
Risks: Hydrogen can be produced in Moray from the electrolysis of water, utilising green
electricity. The production and availability of high-quality water for the electrolyser is a
critical step in the hydrogen production process. It is recognised that water levels in the
springs and rivers within Moray and the Scottish Highlands can fall to low levels during
summer periods of high temperatures with little rainfall. 
Further analysis and engagement with Scottish Water and the Scottish Environment
Protection Agency (SEPA) will be required to confirm the water sources, availability, and
quality and ensure that there is not a negative environmental impact. This will form part
of the feasibility study to identify the best locations for hydrogen production in Moray. 
Guidance 
Assessment criteria and weighting
Bids will be selected for consideration against the following criteria for either large
capital projects or pilots.
Criteria for large capital projects
NB: criteria are qualitative unless stated otherwise
Weighting
(%)
Meets all eligibility criteria (excluding definition of pilot projects) Yes/No
Ongoing positive impact against the Decarbonisation and Efficiencies
Just Transition Outcome (mandatory for all projects) and at least two
other JT Outcomes
20
Identify the risks of negative social and environmental impacts from the
proposal and approaches to mitigate those risks.
20
Potential to have a positive and significant impact on good green jobs
(including number of jobs created/protected), commitment to Fair Work,
and community wealth building including evidence of partnership
working and engagement with relevant businesses to build up supply
chain and skills capacity
25
Ability to demonstrate additionality and the requirement for JTF support
including evidencing the need for public funding support.
15
Evidence of existing transparent partnership and engagement with
relevant local communities. Provide a plan for ongoing community
15
Page 128

Page 129

Appendix 2
involvement that involves solutions to local challenges and plans to
improve people’s lives. 
Briefly outline the broader strategic fit to Scottish Government priorities,
including the National Strategy for Economic Transformation, and
demonstrate how the proposal builds upon existing North East strengths
i.e. workforce, physical assets, supply chain, supporting sectors to
transition to net zero. It should also seek to be a potential multiplier for
other public funds, such as our wider £1.8 billion investment in Heat in
Buildings.
5
Just Transition outcomes
[Not intended to demonstrate projects or activity that would be guaranteed eligibility
or funding under the criteria.] 
• Citizens, communities and place: support affected regions by empowering and
invigorating communities and strengthening local economies
• Jobs, skills and education: equip people with the skills, education and retraining
required to support retention and creation of access to green, fair and high-value
work
• Fair distribution of costs and benefits: address existing economic and social
inequality by sharing the benefits of climate action widely, while ensuring that the
costs are distributed on the basis of ability to pay
• Business and Economy: support a strong, dynamic and productive economy
which creates wealth and high quality employment across Scotland, upholds the
UN Guiding Principles on Business and Human Rights, and continues to make
Scotland a great place to do business
• Adaptation and resilience: identify key risks from climate change and set out
actions to build resilience to these risks, ensuring our economy is flexible,
adaptable and responsive to the changing climate
• Environmental protection and restoration: commit to act within our planetary
boundaries while protecting and restoring our natural environment;
• Decarbonisation and efficiencies: contribute to resource efficient and sustainable
economic approaches that actively encourage decarbonisation, support low-
carbon investment and infrastructure, and avoid carbon 'lock-in'
• Further equality and human rights implementation and preventing new
inequalities from arising: address fuel poverty and child poverty in a manner
consistent with Scotland's statutory targets on each, while furthering wider
equality and human rights across all protected characteristics 
Page 129

Page 130

Page 130

Page 131

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 6 SEPTEMBER 2022 
SUBJECT: LOCAL HEAT AND ENERGY EFFICIENCY STRATEGY 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the duties required under the Local Heat and
Energy Efficiency Strategy (Scotland) Order 2022 and seek approval of plans
to comply with the Order. 
1.2 This report is submitted to Committee in terms of Section III (F) (33) of the
Council's Scheme of Administration relating to providing, developing and
monitoring the Council’s Economic Development and Infrastructure Services. 
2. RECOMMENDATION 
2.1 It is recommended that Committee:- 
(i) notes the duties required under the Local Heat and Energy
Efficiency Strategy (Scotland) Order 2022 and the recent
announcement of funding for the council to progress this;
(ii) approves the appointment of an LHEES Officer as proposed in the
report and associated consultancy work (within the Scottish
Government funding provided) to develop a Local Heat and
Energy Efficiency Strategy (LHEES) and delivery plan; and
(iii) approves the submission of this report and agreed
recommendations to the Community Planning Partnership (CPP),
and for subsequent progress updates to be copied to the CPP. 
3. BACKGROUND 
3.1 The Local Heat and Energy Efficiency Strategies (Scotland) Order 2022 came
into force on 21 May 2022. The Order requires local authorities to publish a
local heat and energy efficiency strategy (LHEES) and delivery plan by 31
December 2023.
Item 7d)
Page 131

Page 132

3.2 An LHEES strategy identifies the long-term priorities required locally to
decarbonise all buildings and infrastructure to fulfil the Scottish Government’s
objectives relating to heat and energy efficiency in buildings, in conjunction
with the council’s own net zero targets. Interventions may occur at building
level or in energy supply networks, or in a combination of both. The strategy is
intended to reflect national and local priorities and factors, such as: 
• Timing of planned infrastructure upgrades;
• Access to resources and funding;
• Major projects;
• Decisions over the local gas grid; and 
• Community engagement.
3.3 An LHEES delivery plan details the actions that the council and its partners
will take to deliver on the changes identified within the LHEES strategy. The
delivery plan clarifies stakeholder roles and responsibilities and co-ordinates
across local partners to provide mechanisms for identifying new delivery
actions. It is intended that the delivery plan will build on existing plans and
policies such as the Energy Efficiency Scotland: Area Based Scheme
(EES:ABS).
3.4 Development of an LHEES strategy and delivery plan will provide a strong
basis for collaborative action by local communities, council and government,
investors, developers and wider stakeholders on a series of priorities.
3.5 A summary of the LHEES priorities are detailed below. 
No. LHEES priority Description
Low regrets
heat
decarbonisation
1 Heat networks Decarbonisation with heat
networks
2 Off-gas grid Transitioning mainly from
heating oil and LPG in off-gas
areas
Secondary
outcomes
3 Poor building
energy efficiency
Actions to address poor
building energy efficiency
4 Poor building
energy efficiency
as a driver for
fuel poverty
Actions to address poor
building energy efficiency as a
driver for fuel poverty
5 Mixed tenure,
mixed-use and
historic buildings
Actions to address mixed-
tenure and
mixed-use buildings, listed
buildings and buildings in
conservation areas
Heat
decarbonisation
6 On-gas grid On-gas grid heat
decarbonisation
3.6 The work required to develop an LHEES strategy and delivery plan is
extensive. There are 8 stages involved which bring together data analysis and
evidence gathered through internal and external engagement. A series of
methodology and guidance papers have been created by the Scottish
Page 132

Page 133

Government to support a standardised approach to LHEES development
across the country.
3.7 A summary of the stages involved in the development of an LHEES strategy
and delivery plan are detailed below. 
3.8 A pilot LHEES project was undertaken by Moray Council and Changeworks in
2021. This project identified the tools, data, skills and resources required to
develop and deliver an LHEES strategy and delivery plan for Moray upon
confirmation of funding. These results will be used to inform the full strategy
and delivery plan.
3.9 In August 2022 it was confirmed that funding of £75,000 per annum per local
authority had been agreed by the Scottish Government and COSLA to
progress work on LHEES for the next five years. This will be provided as a
redetermination of the General Revenue Grant and will be paid in the last 2
weeks of March. This funding can be used for in-house development, as well
as to appoint suitable consultants. 
4. DEVELOPING THE STRATEGY AND DELIVERY PLAN
4.1 Owing to a lack of capacity within the existing staffing resource, it is
recommended that the council creates a new post of Climate Change Strategy
Officer (LHEES).  To align with the funding available, it is proposed that this
post would be a Grade 9 post for a fixed period of five years and developed in
consultation with HR. Subject to the outcome of the Job Evaluation process, it
is anticipated that the post would be a Grade 9 level post and the necessary
work will be taken forward in consultation with HR. The postholder would be
responsible for creating and delivering the actions in the LHEES Strategy,
assisting in securing funding for LHEES actions, and assisting to deliver
Climate Change Strategy actions including, but not limited to, the monitoring
of Moray wide emissions with public, private and community sector partners in
order to assist moray wide climate change actions. 
4.2 The potential for unsuccessful recruitment, balanced with the December 2023
deadline and level of work required, is a substantial risk to the council’s
compliance with the Order. It is recommended that the council also appoints a
consultant for one year to assist in the development of an LHEES strategy
and delivery plan. Initially this consultancy work would consist of collating and
reviewing existing data and the progress made so far with the LHEES strategy
to assist in progressing the strategy while the LHEES officer is recruited. Any
future consultancy will be for assistance in aspects of the LHEES strategy
which cannot be carried out with in-house expertise. The consultancy and Page 133

Page 134

staffing costs would be within the £75,000 budget. It is intended that the
consultant and staff members will complete the documents for adoption by
committee ahead of the December 2023 deadline.
4.3 In developing an LHEES strategy and delivery plan, there is an opportunity to
ensure that the concepts of community wealth building and the retention of
money in the local economy is at the heart of strategy and solutions provided.
The brief to the consultant will ensure that community wealth building and
decentralisation of energy provision is a key consideration.
4.4 The appointment of a suitable consultant via competitive tender may be in
collaboration with other local authorities if deemed to be the most suitable
approach and implementable within the tight timescale available. A project
team will be established, managed by the Climate Change Strategy Officer, to
ensure that internal priorities are firmly embedded in the strategy. A copy of
this report and agreed recommendations will be submitted to the Community
Planning Partnership as the strategy will apply on a Moray-wide basis.
4.5 The progress of the LHEES strategy will be reported to the existing Climate
Change Board and within wider Climate Change Strategy routine updates to
the committee, with updates copied to the Community Planning Partnership.
5. DELIVERING THE STRATEGY
5.1 Upon approval of the LHEES strategy and delivery plan, there will be a need
to implement and monitor the actions identified across the Council and in
partnership with stakeholders, and continually develop the LHEES policy. This
will be the function of the Climate Change Strategy Officer (LHEES) and the
project team. Funding for the actions in the LHEES delivery plan will be
sought from the Scottish Government and via external funding applications. 
6. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Development of LHEES forms part of the Council’s Climate Change
Strategy 2020-2030 which supports the priorities set out in the Corporate
Plan 2019-2024.
(b) Policy and Legal
The Local Heat and Energy Efficiency Strategies (Scotland) Order 2022
requires local authorities to publish a local heat and energy efficiency
strategy (LHEES) and delivery plan by 31 December 2023.
(c) Financial implications
The Scottish Government is providing £75,000 per annum which is to be
used for staffing as set out below and to commission the Council’s
LHEES strategy and delivery plan. There are no direct financial
implications for the Council.
(d) Risk Implications
There is a risk that the Council will be unable to comply with the Local
Heat and Energy Efficiency Strategies (Scotland) Order 2022 and its
own net zero target if work does not commence promptly.
Page 134

Page 135

(e) Staffing Implications
A new post, proposed at Grade 9 but subject to grading in consultation
with HR,  will be created which will be funded by the £75,000 per annum
agreement over the next five years.
If funding continues beyond the five year period and the contract is
renewed, this will have the effect of the employee in post being deemed
to have permanent status.
If funding comes to an end and there is no longer a requirement for the
post, this will result in a dismissal which is most likely to be by reason of
redundancy. The agreed policy and procedure must be followed to
ensure a fair and reasonable process and the appropriate redundancy
payment will be required to be paid.
There will be a requirement for staff from several services including
Strategic Planning & Development, Housing & Property and Education to
work as part of a project team to support the project and provide any
data requested.
(f) Property
There will be property implications linked to the delivery of the LHEES.
Dependent on the actions identified, this may impact on council housing,
corporate buildings and the learning estate. These implications will be
set out in more detail as the key actions relating to property are agreed
and progressed.
(g) Equalities/Socio Economic Impact
There are no equalities/socio economic impacts at this stage. An
Equalities Impact Assessment will be carried out as part of the final
strategy and reported back to the committee.
(h) Climate Change and Biodiversity Impacts
An LHEES strategy and delivery plan will assist with the Council’s
decarbonisation target to be net zero by 2030. LHEES seeks to create
opportunities for decarbonisation internally and within the wider Moray
region, in line with the aims of the Moray Council Climate Change
Strategy 2020-2030.
(i) Consultations
Consultations have been undertaken with the Depute Chief Executive
(Economy, Environment and Finance), the Head of Economic Growth &
Development, the Legal Services Manager, the Head of Housing and
Property, the Head of Education Resources & Communities, the Acting
Housing & Strategy Development Manager, the Property Asset Manager,
the Community Wealth Building Officer, the Energy Officer, the Equal
Opportunities Officer, the Elected Climate Change Champion and L
Rowan, Committee Services Officer. Where comments have been
received, these have been included within the report.
Page 135

Page 136

7. CONCLUSION 
7.1 The Local Heat and Energy Efficiency Strategies (Scotland) Order 2022
places a responsibility on local authorities to publish an LHEES strategy
and delivery plan by 31 December 2023. 
7.2 Complying with the Order will require extensive work both in the
development and implementation of the LHEES strategy and delivery
plan. The committee is asked to approve the recommendations to enable
work to commence. 
Author of Report: George Gunn, Climate Change Strategy Officer
Background Papers: 
Ref: 
Page 136

Page 137

REPORT TO:   ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 6 SEPTEMBER 2022 
SUBJECT:  DEPOT AND STORE REVIEW 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT
AND FINANCE) 
1. REASON FOR REPORT 
1.1 The purpose of this report is to update committee on the progress with
undertaking a review of the Council’s operational depots and stores, in
accordance with the Council’s Property Asset Management Appraisal
(PAMA). 
1.2 This report is submitted to Committee in terms of Section III (F) (3) of the
Council's Scheme of Administration relating to industrial and commercial
development. 
2. RECOMMENDATION 
2.1 It is recommended that Committee:- 
(i) considers and notes the work undertaken to date; 
(ii) notes that Officers have identified opportunities and are working
to deliver early savings as outlined in paragraph 4.7; and 
(iii) notes that a further update on progress will be provided once the
outline business case is developed. 
3. BACKGROUND 
3.1 The Council on 12 December 2018 approved a report which detailed
recommendations aimed at improving how the Council manages and
maintains its property assets (para 6 of the minute refers). The Policy and
Resources Committee on 29 October 2019 approved a report detailing the
Property Asset Management Appraisal (PAMA) Improvement Plan with the
status of actions (para 13 of the minute refers). The Council meeting of 30
June 2021 approved a report which outlined progress and indicated that
delays to progress had been sustained due to the COVID-19 pandemic and
changes of senior lead officers (para 14 of the minute refers). 
Item 7e)
Page 137

Page 138

3.2 Within the PAMA report, there were two recommendations - to undertake a
review of Council Depots and Council Stores. Work commenced on both
reviews.  However, this work was delayed by the onset of the COVID-19
pandemic and then with the change in lead officers within the Housing and
Property Service. Since the appointment of the Property Asset Manager within
Housing and Property a critical appraisal of the work previously undertaken
has been progressed along with considering the impact of changes of working
practices due to COVID-19 and the Council’s Routemap to NetZero. 
3.3 It is acknowledged that significant groundwork has been undertaken and
identification of a number of key themes around the Depot property assets.
However during the review of the work undertaken it has highlighted a
narrowness of scope with the recommendation to undertake two separate
reviews for depots and stores. On review of the asset occupiers this was
particularly highlighted as on occasion the same service has a depot and a
store, at times doing very similar functions. To that end, the decision has been
made to combine both the Depot and Store review into a widened review
looking at the properties the Council uses to support the delivery of services.
This was noted in the updated PAMA report approved at the Corporate
Committee on 30 August 2022. 
4. PROGRESS AND NEXT STEPS 
4.1 As indicated above a review of the work commenced prior to the COVID-19
pandemic has been undertaken. This established a lot of good sound
evidence gathering had been undertaken with clear challenges being
identified in relation to the property assets which apply to both stores and
depots. 
4.2 The impact of the pandemic, changes in senior personnel, service capacity
and the alignment with emergent strategic objectives in relation to
decarbonising the fleet have all impacted on the progress of the review. 
4.2 The challenges identified for the properties can be summarised as:
o The footfall in some locations is substantial with current layouts
restricting how the depots can be used;
o Space within some properties could be maximised if they were
redesigned;
o The general condition of the properties are poor, significant spend
required to being properties to a general adequate standard;
o Staff welfare facilities are poor and require to be upgraded;
o Utility costs are higher than normal due to the condition of the
properties;
o Limited parking at some locations which will restrict transition to electric
vehicles; and
o A number of the properties are “let” by the service occupying it
resulting in a revenue cost to the service. These units could be let on
the open market to generate “real” income to the Council. 
Page 138

Page 139

4.3 Taking these as the challenges faced by the staff using the property assets 
and also the staff managing the portfolio some initial draft objectives for the 
review have been identified: 
i) Reduction in number of buildings services operate from. 
ii) Reduction in need for emergency/ad hoc repairs to remaining property  
assets. 
iii) Reduction in carbon consumption from remaining properties to assist in  
achieving Council’s net zero objective.
iv) Removal of services from properties that are held by the Council to
generate income and/or provide economic opportunities for the local
community (i.e. remove services from industrial units within industrial
estates).   
v) Reduction in overall property holding costs, measured on a rate per  
square metre. 
4.4 The initial phase of work was predicated on detailed information gathering and
service engagement and this will now provide the foundation to inform an
outline business case in accordance of the Councils project management
procedures. During the additional data gathering exercise it has become clear
there are a significant number of properties located within the Elgin area
which provide a similar function. 
4.5 There is potential for financial savings by bringing together as many as
possible of these services onto one single site.  The benefit of this could be to
reduce the number of assets held, identify synergies and seek efficiencies
from shared services and deliver more physically connected services. 
4.6 Housing and Property officers are developing, with engagement from key
stakeholder services, an outline business case for the Depot and Store
review. Appraisal will also take account of the developing Electric Vehicle
(EV) Charging Strategy for the Council’s fleet.  Officers would look to
complete this outline business case as a priority and look to have further
recommendations on this prior to the end of the financial year.  
4.7 Officers have identified a number of opportunities to delivery early savings for
financial year 2023/2024 within the portfolio of secondary depots/stores and
are working with Services with a view to being in a position to deliver these
concurrent with development of the overarching business case. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
This project forms part of the Improvement and Modernisation
Programme of Work that supports the Council priority of a financially
stable Council. 
(b) Policy and Legal
None 
Page 139

Page 140

(c) Financial Implications
Officers have identified the potential for cashable saving of
approximately £86,000 by financial year 2024/2025 as part of the early
assessment of the depot and store estate, however the extent to which
these can be delivered will be subject to the business case as there will
be capital investment required to meet future service needs. 
(d) Risk Implications
The main risks of the review is the engagement of Services and the
completion of the project. Housing and Property officers are working
with Services to ensure they have buy in to the work being undertaken
and remain engaged in a process that has been running for a while.
The review will look to deliver early quick wins if possible to
demonstrate delivery which should support engagement. 
(e) Staffing Implications
Housing and Property staff will progress the full business case and until
recommendations on potential relocation of staff are made there are no
specific staff implications however it is recognised that staff will be
interested and impacted on any final decisions. 
(f) Property
The property implications are as detailed in this report, with particular
reference to paragraph 4.7, officers will seek to deliver further
opportunities from the secondary depots and stores concurrently with
the development of the business case. 
(g) Equalities/Socio Economic Impact
There are no equalities or socio economic issues arising from this
report. However, these will be appraised within the full business case. 
(h) Climate Change and Biodiversity Impacts
No climate change or biodiversity implications have been identified
relating to the recommendations of this report. However, any decisions
on the future of property assets will be heavily influenced by the
Council’s Climate Change Strategy including the EV Charging Strategy
for our fleet. 
(h) Consultations
The Head of Housing and Property Services, Chief Financial Officer,
Legal Services Manager, the Head of Environmental and Commercial
Services, the Equal Opportunities Officer and Lissa Rowan, Committee
Services Officer have been consulted and their comments incorporated
in this report as appropriate. 
Page 140

Page 141

6. CONCLUSIONS 
6.1 Work commenced on the Depot review pre COVID-19.  Following the
departure of the lead officer and subsequent appointment of new lead
officers in Housing and Property the existing work on the Depot review
has been critically appraised. 
6.2 Principal outcomes of that appraisal is that the Depot Review should be
combined with the Store Review to ensure maximum opportunities for
rationalisation. 
6.3 Initial findings indicate that an outline business case for the review of
depots and stores is required taking account of the Covid 19 changes to
working practices and also the net zero strategy and this is being
progressed by Housing and Property Officers with assistance from key
stakeholder services. 
6.4 While the business case work is progressed actions will be taken to
speed up delivery of financial savings and staff benefits within the
secondary depot and stores estate. 
Author of Report:  Neil Strachan, Property Asset Manager
Background Papers:  None
Ref: SPMAN-1285234812-1143 