Economic Development and Infrastructure Services
Committee 
Tuesday, 21 June 2022 
NOTICE IS HEREBY GIVEN that a Meeting of the Economic Development and
Infrastructure Services Committee is to be held at Council Chambers, Council
Office, High Street, Elgin, IV30 1BX on Tuesday, 21 June 2022 at 09:30. 
BUSINESS 
1 Sederunt 
2 Declaration of Group Decisions and Members Interests * 
3 Resolution
Consider, and if so decide, adopt the following resolution:
"That under Section 50A (4) and (5) of the Local Government
(Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Item 13 of business
on the grounds that it involves the likely disclosure of exempt
information of the class described in the relevant Paragraphs of Part 1
of Schedule 7A of the Act.”   
4 Minute of Meeting dated 22 March 2022 
5 Written Questions ** 
6 Cloddach Bridge Structural Assessment
Report by Depute Chief Executive (Economy, Environment and
Finance)  
7 - 12
7 Forres Town Centre Improvement Plan - Funding
Opportunity
Report by Depute Chief Executive (Economy, Environment and
Finance)  
13 - 18
Page 1

Page 2

8 Marine Safety and Operational Summary of 2021-2022
and Update for Q4 2021-2022
Report by Depute Chief Executive (Economy, Environment and
Finance)  
19 - 32
9 Scottish Local Authorities Economic Development
Indicator Framework Report 2020-21
Report by Depute Chief Executive (Economy, Environment and
Finance)  
33 - 50
10 Performance Report (Economic Growth and
Development Services) - Period to March 2022
Report by Depute Chief Executive (Economy, Environment and
Finance)  
51 - 56
11 Performance Report (Environmental and Commercial
Services) - Period to March 2022
Report by Depute Chief Executive (Economy, Environment and
Finance)  
57 - 64
12 Question Time ***
Consider any oral question on matters delegated to the Committee in
terms of the Council's Scheme of Administration. 
Item(s) which the Committee may wish to consider with
the Press and Public excluded   
13 Dallachy Gate Fee
• Information on proposed terms and/or expenditure to be incurred
by the Authority;
• Information on the amount of any expenditure proposed to be
incurred by the Authority; 
Page 2

Page 3

Summary of Economic Development and Infrastructure
Services Committee functions:
Roads Authority; Lighting Authority, Reservoirs Act 1975, Public
Passenger Transport; Flood Prevention; Twinning; Piers and Harbours
and Coast Protection; Industrial and Commercial Development;
Environmental Protection; Burial Grounds; Assistance to Industry or
Commerce; Public Conveniences; Council Transportation; Catering &
Cleaning; Land Reform (Scotland) Act 2003; Countryside Amenities;
Tourism, monitoring funding from European Programmes, youth
training and employment creation scheme and provide Architectural,
Quantity Surveying, Maintenance and Allied Property Services.     
Any person wishing to attend the meeting should contact customer services
on 01343 563217 prior to the meeting as the number of attendees is restricted
due to the recent Covid pandemic 
You can however watch the webcast of the meeting by going to :
http://www.moray.gov.uk/moray_standard/page_43661.html 
Page 3

Page 4

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how
the individual or members of the group will vote on any item(s) of business on
the Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any
relevant and competent business within the specified remits not already on the
agenda, to the Chair provided it is received by the Proper Officer or Committee
Services by 12 noon two working days prior to the day of the meeting.  A copy
of any written answer provided by the Chair will be tabled at the start of the
relevant section of the meeting.  The Member who has put the question may,
after the answer has been given, ask one supplementary question directly
related to the subject matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the
consent of the Chair. If a Member does not have the opportunity to put a
supplementary question because no time remains, then he or she can submit it
in writing to the Proper Officer who will arrange for a written answer to be
provided within 7 working days. 
*** Question Time - At each ordinary meeting of the Committee ten minutes will be
allowed for Members questions when any Member of the Committee can put a
question to the Chair on any business within the remit of that Section of the
Committee.  The Member who has put the question may, after the answer has
been given, ask one supplementary question directly related to the subject
matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than ten minutes
after the Committee has started on the relevant item of business, except with
the consent of the Chair.  If a Member does not have the opportunity to put a
supplementary question because no time remains, then he/she can submit it in
writing to the proper officer who will arrange for a written answer to be provided
within seven working days. 
Page 4

Page 5

THE MORAY COUNCIL 
Economic Development and Infrastructure Services
Committee 
SEDERUNT 
Councillor Marc Macrae  (Chair)
Councillor Amber Dunbar  (Depute Chair)  
Councillor Peter Bloomfield  (Member)
Councillor John Cowe  (Member)
Councillor John Divers  (Member)
Councillor David Gordon  (Member)
Councillor Juli Harris  (Member)
Councillor Sandy Keith  (Member)
Councillor Graham Leadbitter  (Member)
Councillor Paul McBain  (Member)
Councillor Shona Morrison  (Member)
Councillor Kathleen Robertson  (Member)
Councillor Draeyk Van Der Horn  (Member)
Councillor Sonya Warren  (Member)  
Clerk Name: Lissa Rowan
Clerk Telephone: 07765 741754
Clerk Email: committee.services@moray.gov.uk 
Page 5

Page 6

Page 6

Page 7

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 21 JUNE 2022 
SUBJECT: CLODDACH BRIDGE STRUCTURAL ASSESSMENT 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the structural condition of Cloddach Bridge which
is currently closed in the interest of public safety and advise on the options
available for the future operation of this bridge.   
1.2 This report is submitted to Committee in terms of Section III (F) (15) of the
Council's Scheme of Administration relating to management and
implementation of the requirements of the Roads (Scotland) Act 1984.   
2. RECOMMENDATION 
2.1 It is recommended that Committee agree: 
(i) Cloddach Bridge remains closed to vehicular traffic but open to
pedestrians and cyclists with regular inspections to monitor the
condition of the bridge; and 
(ii) when bridge condition deteriorates further and it is not considered
safe for any user, this route is closed permanently and the bridge is
removed. 
3. BACKGROUND 
3.1 Cloddach Bridge was built in 1905 with an estimated design-life of between
100 and 120 years, after which it would require significant refurbishment or
replacement.  This bridge is located on the C2E road and a traffic survey
undertaken in 2020 showed the average number of vehicles crossing the
bridge each day was less than 800.   
3.2 Principal Inspections were undertaken on the bridge in 1995, 1997 and 2019. 
In 2001 a weight restriction of 7.5 Tonnes was applied to the bridge and
following the Principal Inspection and Structural Assessment undertaken in
2019, the allowable weight was reduced to 3 Tonnes.   
Item 6
Page 7

Page 8

3.3 To deter non-compliant vehicles from crossing the bridge a 2m height
restriction was installed in summer 2021.  However, the height restriction was
hit repeatedly by non-compliant vehicles over a period of several months. 
3.4 A Special Inspection and Load Capacity Review was undertaken by officers in
February 2022, to establish how much the bridge had deteriorated and the
impact the deterioration had on the load bearing capacity  The findings of this
assessment indicate significant deterioration and a load bearing capacity of
less than 3 Tonnes.  Based on this assessment Cloddach Bridge was
temporarily closed to motor vehicles in the interest of public safety.  The
maximum length of diversion required because of this closure is 6 miles. 
3.5 To verify the condition of Cloddach Bridge an independent Structural Engineer
was commissioned to undertake a Principal Inspection and Structural
Assessment.  The independent Structural Assessment used more complex
analysis techniques that provide more detail on the structural condition of the
bridge.  The Inspection took place in mid-February 2022, with the Structural
Analysis completed by the end of March.  The report of the Principal
Inspection and Structural Assessment has been uploaded as an additional
document to the Committee Management Information System (CMIS) along
with the agenda.  A summary of the findings is provided below.   
3.6 Findings of the independent Principal Inspection and Structural Assessment: 
• The Principal Inspection (PI) –confirmed that substantial corrosion has
occurred to the steel beams.  The concrete arches between the beams
and the steel soffit are showing significant signs of deterioration. 
These defects are commensurate with the age of the bridge, which is at
the end of its service life. 
• Structural Assessment – The Structural Assessment confirms that the
bridge does not have sufficient capacity for vehicle loading. Details of
the analysis are provided in the report of the Principal Inspection and
Structural Assessment. 
• Recommendations – The Assessment report recommends that
Cloddach Bridge should remain closed to all vehicular traffic.  With
continued monitoring, the bridge could remain open to pedestrians and
cyclists for a period of approximately two years. 
3.7 Potential options for the future operation of Cloddach Bridge have been
identified and these are provided below.  A cost estimate has been provided
for each option by the independent Structural Engineer and this estimate
includes a nominal allowance of approximately 15% for risk.  Given that
construction inflation is currently 30% and there are a number of uncertainties
associated with the repair and replacement works, 15% is considered
optimistic.  At this stage in a construction project it is standard practice to add
optimism bias of 60%.  As a small risk allowance has already been included,
optimism bias of 45% has been added to the options requiring construction
works. 
3.8 Do Nothing – This would allow the bridge to remain open to pedestrians and
cyclists only without further intervention from the Council.  Vehicles would be
Page 8

Page 9

prevented from crossing the bridge by the barriers currently in place on either
side of the bridge.  This option is considered a risk to public safety as no
inspections would be undertaken to monitor the condition of the bridge and
suitability for pedestrian and cycle use. There would also be no turning
facilities for motor vehicles.  There are no costs or economic benefit
associated with the Do Nothing option. 
3.9 Do Minimum – The bridge would remain open to pedestrians and cyclists
only but the structure would be inspected and its condition monitored.  Further
deterioration of the bridge is likely to result in a full closure.  A long term road
closure would be required, with ancillary works such as signage and turning
facilities for motor vehicles.  Erection of bollards or other substantial structure
would be required to prevent vehicle access while allowing access for
pedestrians and cyclists.  The cost estimate for this option is £135,000. It
should be noted that there will be additional costs required to implement a full
road closure when this becomes necessary. There is no economic benefit
associated with this option. 
Costs
Bollards
Signage &
Inspections
Stopping
Up Order
Turning
Head
Construction
Works
Optimism
Bias
Total
£50,000 N/A £85,000 N/A N/A £135,000 
3.10 Close and Demolish Bridge – the bridge would be closed to all users and a
Stopping Up Order would be progressed.  Stopping Up requires the river
channel to be reinstated to its condition before the bridge was constructed and
the land returned to the landowner(s).  The bridge, including abutments and
piers would need to be removed and the channel made good.  The cost of
demolition is estimated to be £333,500.  This cost estimate does not include
any work that may be required to remove the weir which forms part of the
bridge structure.  Any work to the weir would need to be done under licence
from SEPA.  There is no economic benefit associated with this option. 
Costs
Bollards &
Signage 
Stopping
Up Order
Turning
Head
Construction
Works
Optimism
Bias
Total
£15,000 £10,000 £85,000 £120,000 £103,500 £333,500 
3.11 Repair the bridge for pedestrian and cycle use – The bridge would remain
closed to vehicles but strengthening the deck could extend the life of the
bridge for pedestrian and cycle use by 10 years.  There is a risk that the grit
blasting required to repaint the steelwork would reveal further deterioration
that could not be observed during the Principal Inspection.  If this were to
occur it could significantly increase the cost of this option.   The estimated
cost of this option is £435,000. There is no economic benefit associated with
this option. 
Costs
Bollards &
Signage 
Stopping
Up Order
Turning
Head
Construction
Works
Optimism
Bias
Total
Page 9

Page 10

£15,000 N/A £85,000 £200,000 £135,000 £435,000 
3.12 Repair the bridge for vehicular use – This option would require complete
refurbishment of the bridge deck and parapet.  There would also need to be
extensive river bank repairs and repairs to the concrete substructure.  It is
estimated that this option could increase the service life by 50 years.  Given
the uncertainty with the condition of elements of the bridge that could not be
accessed for inspection, the risk associated with this option is considered
significant.  The estimated cost of this option is £2,537,500. The economic
benefit of this option is £74,000 per year. 
Costs
Bollards
Signage &
Inspections
Stopping
Up Order
Turning
Head
Construction
Works
Optimism
Bias
Total
N/A N/A N/A £1,750,000 £787,500 £2,537,500 
3.13 Demolish and replace Cloddach Bridge – This would require demolition of
the exiting bridge and construction of a new single span bridge, which would
have a design life of 120 years.  The estimated cost of this option is
£2,900,000.  The economic benefit of this option is £74,000 per year. 
Costs
Bollards
Signage &
Inspections
Stopping
Up Order
Turning
Head
Construction
Works
Optimism
Bias
Total
N/A N/A N/A £2,000,000 £900,000 £2,900,000 
3.14 Cloddach Bridge is not currently in the Capital Plan for expenditure on repair
or replacement.  Replacement of this bridge is considered low priority as it is
not a critical route and the maximum diversion route is 6 miles.  To be classed
as a critical route the bridge would need to carry more than 7,000 cars per
day, provide sole access to more than 8 properties or provide access to
critical infrastructure such as a fire station or hospital.   
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
“Building a better future for our children and young people in Moray” 
(b) Policy and Legal
Moray Council in its role as Local Road Authority has a statutory duty
under the Roads (Scotland) Act 1984 to manage and maintain the road
network.       
(c) Financial implications
The financial implications are set out in paragraphs 3.9, 3.10, 3.11, 3.12
and 3.13 of this report. 
Page 10

Page 11

When the Council approved the budget for 2022/23 on 22 February
2022 (paragraph 3 of the Minute refers) it balanced only by using
reserves and one-off financial flexibilities. The indicative 3 year budget
showed a likely requirement to continue to make savings in the order of
£20 million in the next two years.   All financial decisions must be made
in this context and only essential additional expenditure should be
agreed in the course of the year.  In making this determination the
committee should consider whether the financial risk to the Council of
incurring additional expenditure outweighs the risk to the Council of not
incurring that expenditure, as set out in the risk section below and
whether a decision on funding could reasonably be deferred until the
budget for future years is approved. 
(d) Risk Implications
Cloddach bridge does not have the capacity to withstand vehicle loading
and there would be a risk to public safety if the bridge were to be re-
opened to vehicular traffic without significant repair or replacement. 
There are a number of unknowns associated with demolition, repair and
replacement of the bridge and there is a risk that the cost of undertaking
these works will increase.  It should also be noted that post COVID
construction inflation is currently around 30%.  There is still uncertainty
around how much this may increase in future and there is a risk that
costs could increase significantly over the next few years. 
In addition, prioritising a bridge in departure from policy creates the risk
that other communities will seek to alter the prioritisation of bridges in
their area which would exacerbate cost pressures as set out in
paragraph (c) above. Foths Bridge was viewed as an exceptional
departure from policy in 2021/22 because a spend to save case could be
made given the need for changes to school transport arrangements
which created additional costs. There are no such considerations for
Cloddagh Bridge.     
(e) Staffing Implications
There are no staffing implications associated with the recommendations
in this report. If another option is to be progressed, staff costs would be
added to the overall project costs.   
(f) Property
Cloddach Bridge currently vests with Moray Council in its role as Road
Authority.  If the bridge is closed and the road is Stopped Up, the land on
which is has been constructed will need to be reinstated and returned to
the landowner.   
(g) Equalities/Socio Economic Impact
If the bridge remains closed to vehicular traffic, a maximum diversion of
6 miles may affect some car users.   
(h) Climate Change and Biodiversity Impacts
Where possible we would seek to recycle and / or reuse the waste
material generated through demolition of the existing bridge.   
Page 11

Page 12

(i) Consultations
Depute Chief Executive (Economy Environment and Finance), Acting
Head of Environmental and Commercial Services, P Connor Principal
Accountant, Legal Services Manager, Equal Opportunities Officer and L
Rowan, Committee Services Officer have been consulted and their
comments incorporated into the report 
5. CONCLUSIONS 
5.1 Cloddach Bridge is currently closed to vehicular traffic, in the interest of
public safety. 
5.2 The bridge can be used by pedestrians and cyclists, if regular
inspections are undertaken to monitor its condition. 
5.3 The bridge cannot be reopened to vehicular traffic without significant
repair work or replacement.  This bridge is not considered strategically
important for the reasons set out in paragraph 3.14 and has not been
prioritised for capital expenditure on repair or replacement. 
Author of Report: Debbie Halliday, Consultancy Manager 
Background Papers: Principal Inspection and Assessment Report - Fairhurst. 
Ref: SPMAN-524642768-743 
Page 12

Page 13

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 21 JUNE 2022 
SUBJECT: FORRES TOWN CENTRE IMPROVEMENT PLAN – FUNDING
OPPORTUNITY 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1  To inform the Committee of funding opportunities that could help to deliver the 
Forres Town Centre Improvement Plan and to authorise submission of 
Expressions of Interest (EOIs) to the funders by no later than 31 July 2022. 
1.2 This report is submitted to Committee in terms of Section III A (2) of the
Scheme of Administration relating to long-term financial plans. 
2. RECOMMENDATION 
2.1 It is recommended that Committee agrees: 
(i)  to approve the submission of EOIs to the National Lottery 
Heritage Fund and Historic Environment Scotland to support 
delivery of the Forres Town Centre Improvement Plan, with no 
financial or contractual obligations to Council; and 
(ii) if successful, to consider a further report in November / December
2022 concerning submission of applications for the development
phase. 
3. BACKGROUND 
3.1  Draft Town Centre Improvement Plans were agreed by the Planning and 
Regulatory Services Committee on 18 January 2022 for Aberlour, Buckie, 
Dufftown, Forres, Keith and Lossiemouth (Paragraph 10 of the minute refers). 
Community consultation on the plans has now been completed and it is 
anticipated that final documents will be reported back to Committee in 
August 2022.  The plans aim to support the regeneration of town centres in 
Moray by setting out a range of proposals, including bringing vacant and 
derelict sites back into use, improving active travel connections, greening and
Item 7
Page 13

Page 14

other streetscape improvements in order to create vibrant; attractive; green; 
healthy, safer and inclusive town centres. 
3.2  The Forres Town Centre Improvement Plan objectives include: 
• Strengthen the unique sense of place of Forres Town Centre by creating a
high quality experience of shops, attractions and facilities for the
community and visitors. 
• Promote Forres as a place that is welcoming and pleasant to spend time
in, that is green and easy to get to on foot and by bicycle.
• Support the refurbishment and regeneration of Forres Town Hall.
• Create a high quality heritage interpretation trail attraction for visitors and
the community to engage with.
• Increase landscaping through the High Street through the introduction of
street trees to connect Grant Park through the High Street to Castlehill
and embed opportunities for food growing.
• Improve public realm to create opportunities for social interaction and
enhance key approaches into the High Street through the lanes linking
into car parks.
• Develop a Shopfront Improvement Scheme to ensure that traditional
shopfronts are retained and improved to strengthen and enhance the
character of the historic High Street.
• Promote sustainable travel and improve pedestrian experience.
• Re-purpose vacant and derelict buildings to reduce the number of empty
properties and increase number of people living in the town centre 
3.3   Forres Conservation Area Regeneration Scheme (CARS) Proposal   
Moray Council agreed at its meeting on 31 October 2018 (Para 9 of the
minute refers) to submit a Forres CARS application to HES based on the
Conservation Appraisal, Management, Action Plan and Interpretation Plans
that were produced to support the scheme, however the fund was very
competitive and the  application was unsuccessful (Paragraph 9 of the minute
refers).  The proposal included: 
• Improvements to public realm
• Repair of priority buildings
• Traditional shopfront repair scheme
• Small grant scheme
• Traditional skills training & interpretation 
3.4  New funding opportunities recently launched by the National Lottery Heritage 
Fund (NLHF) and Historic Environment Scotland (HES) fit the context of place 
based regeneration and therefore align very well with the objectives of the 
Forres Town Centre Improvement Plan.  The funders are working in 
partnership to take a collective approach to their area based funding 
programmes.  They aim to  co-fund heritage projects that support place-based 
regeneration and boost local economies.  Applications for the same project 
can be submitted through each organisations’ individual grant programmes. 
They will work together to consider projects which – with dual funding – can 
maximise impact and deliver positive and lasting change for Scotland’s places 
and communities.
Page 14

Page 15

3.5  NLHF Grants for Heritage programme aims to halt and reverse the 
decline of historic landscapes and townscapes by capitalising on their unique 
character to create attractive, vibrant, and interesting places where people 
want to live work, visit and invest. The programme supports physical works to 
repair and enhance the historic area, activities to help people engage with the 
heritage, development and operational costs. All projects must be inclusive 
and environmentally sustainable. 
3.6 HES Heritage & Place Programme is the successor to the Conservation
Area Regeneration Scheme (CARS).  It aims to contribute to the development
of vibrant and sustainable places in Scotland, through community-led
regeneration of the historic environment. The programme supports the
development and delivery of heritage-focused schemes within conservation
areas, or alternatively distinctive heritage areas with local authority
recognition. 
3.7  For both programmes there are still two separate expression of interest, 
applications, and decision processes but the two organisations will be 
working closely to provide joint support to projects and the 3 stages of 
application will run in parallel: EOI by 31 July 2022, the Development Phase 
(takes up to 12 months) and the Delivery Phase (maximum 5 years from 
commencement of scheme). 
3.8  This funding offers a fantastic opportunity to apply for funding to deliver the 
Forres Town Centre Improvement Plan and to include the wider area. 
Buildings outside the central town boundary of the Conservation Area can 
now be included which creates potential to add important buildings such as 
Nelson’s Tower and the former Leanchoil Hospital to the proposal.  The NLHF 
can contribute to green spaces therefore Grant Park could also be added. 
There  would also be scope to include stone masonry apprenticeships, as 
delivered by Elgin CARS. 
3.9  The Discover Moray’s Great Places partnership project led by the Moray 
Economic Partnership under the theme group Tourism and Culture in 
2019/2020, produced a wealth of interpretive material relevant to Forres.  This 
resource could be used in combination with the Interpretation Plan produced 
for the Forres CARS proposal, to develop a high quality heritage interpretation 
trail that would engage the local community and visitors, as outlined in the 
Forres Town Centre Improvement Plan.   
3.10 Initial meetings with stakeholders in the Forres area will be held to help define 
the EOIs and demonstrate community support.  If the EOIs are successful, a 
more detailed report will be presented to Committee in November / December 
2022 to request approval to submit applications for the Development Phase 
(max length 12 months).  A Partnership Agreement will be drawn up during 
this phase. 
3.11 In 2024, the Delivery Phase applications (if submission is approved and 
successful), will result in a 5 year investment programme similar to what was 
carried out under the Castle to Cathedral to Cashmere project.   
Page 15

Page 16

3.12 There are also additional place based funding opportunities which could also 
provide match funding such as UK Shared Prosperity Fund and the  Place 
Based Investment Programme. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) 
The project will contribute to achieving the corporate plan priority to
promote economic development and growth, also the LOIP priority of a
growing and sustainable economy. 
(b) Policy and Legal
The Council considers support for economic development issues on their
merits, against the objective to facilitate sustainable economic growth
and the desired outcomes of the Ten Year Plan and Corporate Plan.
For any partnership agreement for the Development Phase Legal will be
consulted. 
(c) Financial implications
None arising from this report however both schemes have the potential
to secure substantial investment. NLHF Grants for Heritage can provide
grants of £250,000 up to £5 million and the HES Heritage & Place is
offering grants from £750,000 up to £1.5million. 
(d) Risk Implications
None arising from this report 
(e) Staffing Implications
Staff from the Economic Growth and Regeneration section will prepare
and submit the EOIs in consultation with stakeholders. If invited to
submit applications for the Development Phase, it is considered that
preparation of the applications can be accommodated within existing
staffing resources.  Staffing costs are eligible for the Delivery phase and
will be included. 
(f) Property
None arising from this report 
(g) Equalities/Socio Economic Impact
An equality impact assessment is not required because the reason for
the report is for the Committee to consider a request to submit EOIs for
funding. An equality impact assessment will be submitted with the next
report if the EOIs are successful. 
Page 16

Page 17

(h) Climate Change and Biodiversity Impacts
No climate change or biodiversity implications have been determined for
this report because the reason for the report is for the Committee to
consider a request to submit EOIs for funding. 
(i) Consultations
Consultation has taken place with the Depute Chief Executive
(Economy, Environment and Finance), the Head of Economic Growth
and Development, the Legal Services Manager, the Equal Opportunities
Officer, Paul Connor (Principal Accountant) and Lissa Rowan
(Committee Services Officer) and comments received have been
incorporated into the report. 
5. CONCLUSION 
5.1 Delivery of the Forres Town Centre Improvement Plan is an agreed
priority that aligns well with the new NLHF Grants for Heritage and the
HES Heritage and Place Programme. 
5.2  The new schemes present a good opportunity to secure significant 
funding for regeneration of the Forres area based on the extensive 
preparatory work previously undertaken for Forres CARS and requires 
submission of EOIs by 31 July 2022 only at this stage. 
5.3 There are multiple strands of complementary match funding available
for both development and delivery work which could result in a
substantial programme of investment for the Forres area, similar to
Elgin and Keith CARS. 
Author of Report: Kirsty Conti, 
Development Officer
Background Papers: Documents on file in Economic Growth & Regeneration
Ref: 
Page 17

Page 18

Page 18

Page 19

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 21 JUNE 2022 
SUBJECT: MARINE SAFETY AND OPERATIONAL SUMMARY OF 2021/22
AND UPDATE FOR Q4 2021-2022 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee on matters of Marine Safety and compliance with the
Port Marine Safety Code (PMSC) for the year 2021/22 and details of Q4
2021/22. 
1.2 This report is submitted to Committee in terms of Section III (F) (25) of the
Council's Scheme of Administration relating to the functions of Council as
Statutory Harbour Authority (SHA). 
2. RECOMMENDATION 
2.1 Committee is asked to consider and note the safety performance, fulfilling
its function as Duty Holder under the Port Marine Safety Code. 
3. BACKGROUND 
3.1 Under the statutory requirements of the Port Marine Safety Code (PMSC) the
organisation (Moray Council) must appoint a Duty Holder to ensure compliance
with the PMSC is achieved. The organisation must provide a report on PMSC
performance annually as a minimum. 
3.2 The role of Duty Holder is held by members of the ED&IS committee. The role
requires accountability for ensuring the organisation’s compliance with the
PMCS. 
3.3 At a meeting of this committee on 20 March 2018 it was agreed that a report on
PMSC would be submitted quarterly (paragraph 6 of the minute refers). 
3.4 Moray Council, in its capacity as a Statutory Harbour Authority, is committed to
undertaking and regulating marine operations to safeguard all its harbour areas,
the users, the public and the environment through its safety management
system, (SMS). 
Item 8
Page 19

Page 20

4. ANNUAL REVIEW 2021/22 
4.1 The following sections of the report set out an overview of marine safety
performance in 2021/22, with specific details for Quarter 4 2021/22 provided in
APPENDIX 1. 
PMSC Audit 
4.2 As defined by the PMSC a Designated Person is required to provide 
independent assurance directly to Duty Holders that the organisation is 
compliant with the PMSC. The Designated Person is an independent person or 
body. For Moray Council, Marex Marine is appointed as Designated Person. 
This assurance is achieved through the Designated Person carrying out audits, 
and by contacting the duty holders and management when necessary. 
4.3 A full audit of Moray Council compliance with PMSC was carried out by Marex 
Marine within its capacity as Designated Person. This audit was conducted on 
12 October 2021 and concluded that the Moray Council harbours are compliant 
with the PMSC. 
4.4 The Audit process made observations, which are provided in the table below. 
Observations from PMSC Audit: 
Observation Progression
Review Harbour Bye-laws with
particular regard to continued
relevancy
Liaison with legal department required
to establish a time to review bye-laws
during 2022/23.
Consider cyber security protocols Addition of cyber security policy to be
added to SMS during review cycle.
Risk assessment review required Annual Risk assessment review
carried out in February 2022.
SMS updates, rewording suggestions Review of SMS with aid from Quality
Management Systems officer planned
June/July 2022.
Consideration of adding extra safety
signs around harbour
In conjunction with ongoing water
safety group meetings, considerations
for signs required to be discussed.
Increasing drills carried out with
external institutions suggested
Plans to be made to include exercises
with local fire brigade. 
4.5 Committee is the Duty Holder for the PMSC and is required to be conversant 
with the PMSC and its relevant content. Training will be provided through the 
Designated Person Marex Marine in the coming months. 
Annual Accident, Incident and Near Miss Statistics 
4.6 The table below summarises the incidents that occurred throughout 2021/22, 
as previously reported in quarterly reports.  
Page 20

Page 21

Quarter Injuries Incidents Near Misses
1 1 2 0
2 0 1 0
3 1 1 0
4 0 0 0
Total 2 4 0 
4.7 The number of injuries and incidents at Moray Council harbours during 2021/22 
is extremely low. There is however room for improvement and the findings from 
Designated Person will be used to implement safeguards for the coming year. 
With this in place the target for Accidents, Incidents and Near Misses is 0. Any 
Accidents, Incidents and Near Misses that do occur will be investigated 
thoroughly and reported accordingly at quarterly and annual meetings of this 
committee. Lessons learned and actions arising from the events will be detailed 
in future reports. 
4.8 Details of the injuries, incidents and near misses for the year 2021/22 are 
provided below. This information was reported in previous quarterly reports to 
this committee. 
4.9  Injuries: 
1. During the event of grounding which occurred at Buckie harbour in May
2021, (Q1) a member of crew on board a fishing vessel was injured. The
Incidents section below details the outcomes and actions arising from the
accident. 
2. An eye injury occurred on board MV Selkie on 17th December (Q3).  This
injury was dealt with by medical professionals and the incident documented. 
4.10 Incidents: 
1. Q1 May and June 2021 there were two incidents of grounding within the
channel at Buckie Harbour. The Investigation found that an uncharacteristic
high pressure was present and this had lowered the water level causing the
first grounding. The second was caused by a failure of the approaching
vessel to communicate appropriately. 
An investigation was undertaken into these incidents by the Designated
Person (Marex Marine) and the recommendation from this investigation was
a new mandatory communication procedure between incoming/outgoing
vessels and harbour staff which was implemented in July 2021. 
2. There was an incident reported in Burghead during Q2 of accidental
damage caused by maintenance work at the harbour.  This matter was dealt
with by the Council’s insurer. 
3. During Q3 there was an incident at Burghead harbour involving a spill of
hydrocarbons. This spillage was cleaned using appropriate oil spill
equipment and disposed of in an appropriate manner.  The incident was
reported to the coastguard. 
Page 21

Page 22

Aids to Navigation 
4.11 The table below summarises the availability of Navigational lights under Moray
Council’s responsibility. 
4.12  As a Local Lighthouse Authority, Moray Council is required to report the
availability of all of its navigational lights to the Northern Lighthouse Board in
March of each year. Currently the Port Closed light on the North Pier in Buckie
is unavailable resulting in availability figures being decreased. This has been
discussed with the Northern Lighthouse Board and they have noted it is not an
urgent requirement as the light is not mandatory and other provisions to
communicate any port closures are available. Given the position of Northern
Lighthouse Board, the relative low use of the light, alternative means of
reporting the harbour closed and its position being liable to weather damage,
there are no immediate plans to fix this light. 
4.13  The ‘Availability Objective’ is calculated over a rolling 3-year period. This means
that over this period a Cat 1 Aid to Navigation needs to be functional for 99.8%
of the time. Currently Moray Council is meeting this target. The availability of
Cat 2 and 3 lights is below the target availability. 
4.14 The target for the year 2022/23 is to increase the availability figures of Cat 2
lights to 95% and Cat 3 lights to 97%. An availability of 95% for Cat 2 lights is
still below the 97% target however, this will be rectified over the rolling 3 year
period after planned improvements (as the figures is a rolling average it will take
time to rise). The improvements will be achieved by utilisation of new solar
powered lights that once installed will provide more efficiency due to less
reliance on unsuitable cabling prone to faults. 
4.15 New solar powered lights will be installed in Burghead and Buckie. The new
solar powered lighting will decrease the number of faults observed and as a
result over time lead to an increase in the availability figures for all navigational
aids. This work has been funded by Scottish Government Marine Fund Scotland
Scheme and is planned to be completed by end of July 2022. 
4.16  A risk assessment for changing the lighting system will be prepared and
approved by the Northern Lighthouse Board. A Notice to Mariners has been
prepared and this will be sent to all harbour users and the U.K Hydrographic
Office (UKHO) so visiting vessels can be informed of this change. 
Pilotage 
4.17 Pilotage for vessels at Buckie Harbour is provided on request, in line with the 
risk assessment required under the Pilotage Act. However, it is not compulsory 
for a vessel to take a pilot at Buckie Harbour. The number of pilotage acts
Page 22

Page 23

carried out in the year 2021/22 was 50, in relation to 94 vessel movements in 
and out of the harbour. 
Training and Staffing 
4.18 Pilotage training continues for 2 members of staff with 1 member of staff 
deemed competent to pilot during daylight hours, after an assessment from the 
authorised Pilot. 
4.19 The training requirement for all harbour staff is currently being reviewed. 
4.20 Recent recruitment within the harbours team includes the appointment of two 
new Assistant Harbourmasters and one Harbour Assistant.   
4.21 There is still a vacancy for the Master of MV Selkie, as the previous rounds of 
recruitment have not been successful. In the meantime a competent agency 
Master is fulfilling the role. 
Conservancy 
4.22 In Buckie the current depth under chart datum is 2.1 Metres with relevant Notice
to Mariners promulgated. 
4.23 There is a target Depth of 3.0 metres to be reached in all areas of the channel 
and basins 1-3 by the end of year 2022/23. Progress toward this will be reported 
quarterly as a KPI. 
4.24 Immediate dredging plans are to prioritise the channel entrance and basin 2. 
The dredging plan includes provision to continue to dredge at Buckie regularly 
as the main priority of the dredging programme. 
4.25 Burghead is attended any time there is a suitable weather window during
manned periods and when tidal conditions suit. Currently the depth below chart
datum at the entrance of Burghead harbour is 0 metres. The poor condition of
Burghead groyne continues to have a negative impact in terms of accumulation
of sand in the harbour channel. Plans have been prepared for repairs to the
groyne, which are being put forward for consideration as part of the capital plan. 
4.26 There is a Notice to Mariners published, warning vessels of the fluctuating 
depths within the entrance channel of Burghead, advising all mariners to 
contact the Harbourmaster for accurate information. 
4.27  There has been an increase in available water under chart datum of 1.0 metre
in the west basin and channel at Findochty harbour, as a result of the dredging
campaign in 2021/22. 
4.28  The priority areas for dredging remain Burghead (sand bank approaching
harbour entrance) and Buckie (entrance channel). Other dredging requirements
include:   
o Hopeman: a plan is being developed for dredging the inner basin and
channel during 2022/23. 
Page 23

Page 24

o Cullen: a dredging plan for the basin at Cullen is being prepared for
implementation in 2022/23.
o Portknockie: there is no need for dredging plans at Portknockie in
2022/23.
o Findochty: Dredging will be targeted at the entrance channel and areas
around the middle jetty. 
Selkie 
4.29 MV Selkie has completed works within Buckie, Burghead and Findochty during
the year of 2021/22. The table below summarises the work carried out during
the year:  
Harbour Total Tonnage removed  Digging Days
Buckie 8,770 49
Burghead 3,700 20
Findochty 1,650 8
Weather Days  62
Maintenance Days  59 
4.30 During 2021/22 there has been has been an increase in the total tonnage
removed to spoil by MV Selkie compared to the previous year. Over the course
of the year the downtime for maintenance also reduced, although this isn’t
clearly demonstrated in the total figures for the year. There has been an
increase in the amount of days the vessel has not been able to work due to
adverse weather, particularly over the winter / spring period. 
Selkie Management Plan 
4.31 It is important in fulfilling the duty of conservancy that the council’s dredging 
resource is carefully managed to maximise efficiency of operation. The MV 
Selkie is currently focussed on internal dredging priorities. Commercial 
dredging opportunities will only be sought for the Selkie when it is clear that 
internal dredging priorities have been addressed, or there is clear capacity for 
that work to be done in a timely fashion. 
4.32 The table below shows the productivity of the dredger from April 2017 to April 
2022. It should be noted that some data was not specifically collated in previous 
years for reporting and this is marked as n/a. 
Days worked and total tonnage removed 2021/22 vs 2020/21
Year Days
working -
Internal
Weather
days
Maintena
nce
Working
days %*
Tonnage
Removed
Days
Working -
External
2017/18 60 n/a n/a n/a 14,510 3.5
2018/19 16 n/a n/a n/a 6,651 10
2019/20 35 n/a n/a n/a 7,671 60
2020/21 38 14 46 39 11,240 
2021/22 77 62 59 39 14,120 
*Working days % is the percentage of the total crewed days where dredging
operations are undertaken, rather than maintenance or standing-by for suitable
weather conditions. 
Page 24

Page 25

4.33 The efficiency of the dredging operation is measured in terms of the following 
indicators: 
- total working days (i.e. vessel crewed);
- % of working days v crewed days;
- tonnage removed from harbours;
- cost of operation and
- depth of water available in each harbour. 
4.34 New KPIs measuring the percentage of days working and days of maintenance 
have been introduced and will be reported moving forward as a measure of the 
vessels working efficiency with a target of 50% working days and 20% 
maintenance days set. 
4.35 The plan for increased efficiency moving forward is to maximise the number of
days crewed on vessel and continue to work effectively with maintenance to
lower the number of maintenance days further. 
4.36 A business case to install marine mammal observation equipment is being
investigated.  This equipment would allow Selkie to work in more marginal
weather conditions above a force 3 at spoil dumping grounds. This would
further improve the efficiency of dredging operations. 
4.37 The cost of operating Selkie is monitored against the established budget. 
Financial Year Budget Actual Cost
2019/20 £259,026 £434,635*
2020/21 £252,966 £260,437
2021/22 £273,895 £307,795
*offset by additional income of £136,374 from Forth Ports 
4.38 In 2019/20 there was £176K additional expenditure £64K of agency costs, staff 
training £5K, additional running costs of £21K and additional Plant 
maintenance/repairs of £86K, offset by the additional income above of 
£136,374. 
4.39 In 20/21 there was additional legal fees of £7K in relation to the bare boat 
charter that was considered for the vessel. 
4.40 In 21/22 there was £34K additional expenditure, £10K of additional agency 
costs, £20K of internal fleet recharge and £4K of additional plant repairs. The 
additional costs were absorbed within the Marine Services budget, which 
overall presented a balanced out-turn. 
4.41 The planned measurable improvement is to see a reduction in running costs 
with a target of being within budget for 2022/23. This will be achieved through 
continued improved maintenance of the vessel which is measured both in 
running costs and in days the vessel is un-operational due to maintenance as 
well as a reduction in fuel costs which will be achieved when Selkie is able to 
berth in Burghead as described above. There has already been a trend
Page 25

Page 26

toward fewer maintenance days during 2021/22 and current figures for Q1 
22/23 continue this pattern. 
4.42 The following table provides a summary of actions and targets for Selkie for 
the coming year: 
Action Progress (next review
30/06/22
Completion Target Date 
Conservancy 
Buckie Channel Depth
3.0M
Current depth 2.2M 31/03/23
Buckie Basin 1/2/3 depth
3.0M
Current depth 2.2M 31/03/23
Provide 0.3M channel
Burghead
Current depth 0.0M 31/03/23 
Productivity 
Maintenance days less
than 20%
Currently 19% Continuous
Working days greater
than 50%
Currently 37% Continuous
Total tonnage removed
above 14,120 Tonnes
2,840 tonnes @ 4/6/22 31/03/23
Total working days above
77
24 days @ 4/6/22 31/03/23 
Staffing 
Appoint permanent
Master
Q2 recruitment campaign 30/09/22 
Safety management/
Maintenance 
SMS review and Update In progress 31/10/22
Full Risk assessment
review & update
In progress 31/10/22
Planned maintenance
system implementation
Establish business case –
quote received
31/08/22 
Financial 
Lower Running costs to
within Budget
Monitor 31/03/23 
Green Harbours 
4.43 There has been continuing work carried out with the focus on lowering carbon 
emissions and promoting overall environmentally sound practices within the 
harbours. 
5.  FUTURE PLANS AND ACTIONS 
Dredging Plans 
5.1 In 2022/23 it is proposed that MV Selkie continues to fulfil its role in carrying out 
maintenance dredging across the council’s six harbours. Subject to financial 
approval by Moray Council as part of the capital planning process on 29 June 
2022, it is proposed that a specific outsourced dredging campaign is carried out 
in order to:
Page 26

Page 27

a)  provide the necessary depths of water associated with the Moray
West Offshore O&M contract at Buckie; and 
b) to efficiently re-establish the channel at Burghead harbour, which
has been diminished through significant sand movement in recent
years – exacerbated by the failure of the groyne as described at para
4.16. 
5.2 At Buckie it is proposed to dredge the channel and basins 2 and 3 to a level of 
3.0 metres below chart datum, ready for lease requirements from August 2023. 
This is calculated at 12,783m3. This is a large scale piece of work, specifically 
related to the requirements of the offshore supply chain for windfarm O&M who 
have specific depth parameters as part of their contractual arrangements. The 
O&M contracts are financially generative for the Council, and this work forms 
part of this wider package. The scale of work is such that it would be inefficient 
for the council’s own dredger to undertake the work, and would also divert the 
vessel away from its core maintenance dredging programme. 
5.3 At Burghead Harbour there has been significant sand movement in recent 
years, exacerbated by the failure of the groyne as described above. Similarly 
to the position at Buckie, by having a targeted campaign externally resourced 
this provides an efficient means of re-establishing the desired channel depth at 
Burghead, which the Council’s dredger can then maintain. 
5.4 The Council’s dredger, MV Selkie, was specifically designed to be a small agile 
vessel that can access all of the council’s harbours for routine maintenance, 
rather than a larger vessel which whilst able to take larger quantities of spoil in 
one trip, would be too large to access all of the council’s harbours. 
Actions identified for 2022/23 
5.5 Detailed review of the Safety Management System (SMS): the SMS will be 
reviewed during quarter two and three and a revised SMS will be presented to 
a future meeting of this committee. The review will include emergency response 
and preparedness, full risk assessment and health and safety MS, including 
planned implementation of a safety observation card scheme. 
5.6 Review of the Marine Policy and Harbour Bye-laws to be initiated in Q2. 
5.7 Review training requirements. 
5.8 Increase momentum of Pilot training and accreditation leading to two fully 
competent Pilots within the Harbour team by the end of Q3. At this stage plans 
will be made to undertake training for a third Pilot. 
5.9 Continue recruitment drive for Selkie Master. 
6.  SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP)
Page 27

Page 28

Sustainable harbours maintained to operate safely and efficiently
contribute to the economic development of Moray. 
(b) Policy and Legal
Non-compliance with the Code will have legal implications, which will
depend on the nature of the non-compliance. 
(c) Financial implications
Non-compliance of the Code may have financial implications in terms of
any cost of remedial action. 
(d) Risk Implications
Failure to comply with the Port Marine Safety Code could result in
prosecution of the authority. 
(e) Staffing Implications
No staffing implications arise from this report. 
(f) Property
There are no property implications arising from this report. 
(g) Equalities/Socio Economic Impact
There are no specific equalities matters, however, the Equalities Officer
has been consulted and comments incorporated into this report. 
(h) Climate Change and Biodiversity Impacts
There are no climate change and biodiversity implications arising from this
report. 
(i) Consultations
The Depute Chief Executive (Economy, Environment and Finance), Legal
Services Manager, Principal Accountant (P Connor), Committee Services
Officer (L Rowan), and Equalities Officer have all been consulted and their
comments incorporated into this report. 
7.      CONCLUSION 
7.1 The Council is currently deemed to be compliant with the PMSC, however,
work to maintain a safe environment is ongoing in a dynamic environment.
Diligent staffing and constant monitoring and risk assessing will be utilised
to maintain compliance as demands evolve. 
Author of Report: Stuart Akass, Harbours Development and Operations
Manager 
Background Papers: 
Ref: SPMAN-524642768-746 
Page 28

Page 29

APPENDIX 1 
1. Q4 SUMMARY 
1.1     Incident statistics 
Quarter Injuries Incidents Near Misses
4 0 0 0  
There were no recorded incidents, injuries or near misses for the period of
quarter 4. 
1.2  Conservancy 
Dredging has continued over the 4th quarter of 2022/23 and into the 1st quarter
of 2022/23, with priority given to Buckie navigational channel and Burghead
channel. 
1.3 From 1st January 2022 to 31st March 2022 (Q4) the total amount of spoil
removed to designated spoil grounds was 3330 Tonnes over 24 digging days.
This includes the harbours of Burghead and Buckie. 
1.4 The poor condition of Burghead groyne continues to have a negative impact in
terms of accumulation of sand in the harbour channel. Plans have been
prepared for repairs to the groyne which are being put forward for consideration
as part of the capital plan 
1.5 Selkie 
As agreed by members at a meeting of this Committee on February 8th 2022.
Information on work carried out during Q4 by MV Selkie is provided in the tables
below: 
Table 1 summary of Selkie working Q4 2021/22
Harbour Cumulative
working days
Cumulative
weather days
Cumulative
maintenance days
Buckie 18 29 9
Burghead 6 1 0
Total (%) 24 (38) 30 (48) 9 (14) 
Table 2: Spoil removed per harbour Q4:
Harbour Tonnage Removed Q4 Digging days per harbour
Buckie 2,250 18
Burghead 1,080 6 
These figures indicate that the vessel is less productive as a percentage of
working days than for overall annual figures for previous years. However, it
should be noted that quarter 4 figures are for the winter months and more
working days are generally available in the summer months due to favourable
weather conditions. 
Item 8
Page 29

Page 30

2. Safety related works
There have been a number of jobs completed during Q4 improving safety
conditions within all harbours, these works include: 
• Repair of shutter doors in Fish Market and general improvements to
bump stops and protective bumpers in chills.
• Use of algaecide to remove potential slip hazards on quaysides.
• Repair of electrical cable supplying Navigational Light in Buckie.
• Repair of ladders and hand holds throughout harbours.
• Replacement of life-rings.
• Repair of Water supply and steps in Findochty. 
• Placement of protective barriers to limit impact of land slip and maintain
safe access to Portknockie harbour quays.
• Production of list of works ready for Cullen seeking approval from
planning department due to listed consent needs.
• Repair of minor potholes in quays reducing trip hazards. 
3. MISCELLANEOUS SAFETY BUSINESS 
3.1 Signage 
There has been a full audit identifying new signs required around the harbours
including:
1. 4 signs to restrict general access to the pontoons
2. Harbour operations signs.
3. Designated visitor berths.
4. Operational speed restrictions
5. Keep slipway clear signs. 
These will be erected on delivery within the next quarter. 
3.2 Water Safety Group 
The next scheduled meeting of the Water Safety Group is to be confirmed by
the Chair. The chair of the group is the lead of Water Safety Scotland. Due to
a large work commitment, the current chair aims to stand down as the group is
now developed and progressing. Future meetings will seek to find a
replacement Chair. 
The group is currently reviewing the Partnership Approach to Water Safety
(PAWS) document in consultation with the emergency services. 
Full water safety risk assessments are being undertaken at the harbours along
with a review of all signage.  New signage has been ordered for the harbours
and some adjoining beaches where issues have occurred in the past.   
Consideration is also being given to suitable signage for coastal walking routes,
which whilst outside the remit of the harbours team is in scope for the group. 
Page 30

Page 31

The community in Hopeman has committed to install a rescue box containing
Thermal Protective Aids (TPA’s), 
Gordonstoun School has a water safety group working in partnership with the
Coastguard and they are researching ways to share the water safety message
with their peers at other schools. 
3.3 Pilotage 
Pilotage is not compulsory at Buckie harbour, therefore, not all cargo
movements require the services of a pilot. The number of pilotage acts carried
out in the fourth quarter of 2021/22 was 10, in relation to 26 vessel movements
in and out of the harbour. 
Page 31

Page 32

Page 32

Page 33

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 21 JUNE 2022 
SUBJECT: SCOTTISH LOCAL AUTHORITIES ECONOMIC DEVELOPMENT
INDICATOR FRAMEWORK REPORT 2020-21 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform committee of the performance of Moray Council in the Scottish
Local Authorities Economic Development, Indicators Framework Report 2020-
21. 
1.2 This report is submitted to Committee in terms of Section III (F) (2) of the
Council's Scheme of Administration relating to the exercise of functions that
promote economic development. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee consider the performance of the
Council’s economic development activity and benchmarking against
other local authorities through the Scottish Local Authorities Economic
Development Group Indicator Framework Report. 
3. BACKGROUND 
3.1 The Scottish Local Authorities Economic Development Group (SLAED) is a
network of economic development officials from across all 32 Scottish local
authorities. SLAED exists to provide a national voice for local economic
development in Scotland by linking the work of Scotland’s 32 local authorities
and bringing a collective influence to bear at national and European levels. 
3.2 Each year, SLAED publishes an Indicator Framework Report, setting out data
and information based on returns submitted by the 32 local authorities. The
purpose of the SLAED Indicators Framework is to assist Local Authorities to: 
• evidence and publicise the contribution that they make to Scotland’s
economy through their economic development activities; and
Item 9
Page 33

Page 34

• provide a basis for collating consistent data which can be used to better
understand impact and identify potential areas for improvement. 
3.3 This report, covering the 2020-21 financial year, is the 9th annual report and
covers the period which commenced during the first national lockdown. As a
result, the data included must be viewed within the context of two significant
events which have had a detrimental impact upon economic performance in
Scotland; the Covid-19 pandemic, and the UK’s exit from the European Union.
These events have led to an increase in national unemployment, created new
challenges in exporting goods and services, and resulted in a constricted
labour market. 
3.4 Local authorities have been pivotal in supporting businesses and local
economies in navigating these crises. Through administering a range of grant
funding programmes, local authorities across Scotland have awarded in
excess of 91,000 grants, totalling in excess of £1billion, to support businesses
to survive. 
3.5 Economic Development Officers are responsible for submitting an annual
return for 8 of the indicators. The remainder are taken from national datasets
that various Council departments update as part of their function. The full
report has been uploaded to the Committee Management Information System
(CMIS) along with the agenda. 
3.6 The SLAED Indicator Framework includes a suite of 31 indicators, each of
which will be expanded upon in the following sections, providing an overview
of the performance of Moray’s economy. Where relevant and available,
comparison with data from previous years and against the Scottish average
has been included. 
4. INPUT INDICATORS 
4.1 I1 Economic Development and Tourism Expenditure – estimated 
Indicator I1 provides an estimate of the capital and revenue spend of the
Council on Economic Development and Tourism activities, alongside a
comparison of the total spend across Scotland. 
2020/21 Total spend by Moray
Council
Total spend in
Scotland
Total expenditure £3,267,000 £479,879,000
Capital spend £228,000 £119,197,000
Revenue spend £2,999,000 £360,682,000 
From 2019/20 to 2020/21, the proportion of Moray’s expenditure against the
total across Scotland increased from 0.5% to 1.0%. The reduced figure for
Scotland is largely resulting from the completion of the AECC within Aberdeen
City in 19/20 and significant spend associated with this. Conversely, it is
expected that Moray’s expenditure against this indicator will increase
substantially in future years as delivery of the Moray Growth Deal is
Page 34

Page 35

accelerated. The graph below highlights the variation in level of expenditure
on economic development and tourism activities across Scottish Councils: 
4.2 I2 Economic Development Staffing – estimated 
This indicator is a measure of the total number of FTE staff working on the
delivery of the Council’s economic development services. Both locally and
nationally there was an increase in staff numbers when compared with
previous years. This was partially a result of the figure being inclusive of
Business Gateway staff for the first time, where they were usually accounted
for separately. 
Year Moray Council (FTE)
Economic Development staff
Scotland (FTE) Economic
Development staff
2020/21 29.3 1,353.3
2019/20 24.3 1,259.2
2018/19 24.3 1,300.3
2017/18 24.0 1,280.4
2016/17 25.6  1,262.2 
In Moray, the increase also reflects the appointment of additional keyworkers
in the Employability and Skills teams, on a temporary basis, to support
delivery of Moray Pathways and the creation of the Local Employability
Partnership. 
5. ACTIVITY INDICATORS 
5.1 A1 Number of Attendees at Business Gateway Events 
Page 35

Page 36

Indicator A1 provides a measure of activity delivered by Business Gateway
and counts the number of people that attended Business Gateway events in
2020/21. As a result of Covid-19 restrictions, these events were held virtually
rather than in person. These consist of workshops to develop business skills
and training for start-up, and growth acceleration. 
Year Event Attendees
2020/21 340
2019/20 250
2018/19 2,269
2017/18 1,599
2016/17 1,452 
As a result of social restrictions resulting from the pandemic, Business
Gateway main event in Moray was cancelled, as was the case in 2019/20.
This, along with other Covid-19 related factors, has resulted in the significant
drop in event attendees locally. The transition to online events has also
changed the way in which businesses can access Business Gateway support.
Local businesses can now attend Business Gateway events in any council
area, not just the one that they are registered in. 
5.2 A2 Number of Attendees at Business Events provided by the Council 
This indicator measures attendance at one-to-many business events, as
opposed to the one-to-one support provided to businesses measured under
indicator OP1. 
Year Event Attendees
2020/21 4,905
2019/20 1,893
2018/19 1,800
2017/18 1,499
2016/17 641 
In 2020/21, there was a total of 8,779 attendees at business events provided
by Councils across the whole of Scotland. Moray Council accounted for 4,905
of those, which was 55.9% of the total. This was a result of the online Moray
Digital Doors Open Day event, held during the period, which allowed access
to local heritage facilities. 
5.3 A3 Number of Companies Registered with Supplier Development
Programme 
This indictor provides a measurement of local businesses that are engaged in
public procurement activity, through counting the number of businesses in
Moray that are registered with the Supplier Development Programme (SDP). 
Year Companies Registered with SDP
2020/21 129
2019/20 117
2018/19 60
2017/18 36
Page 36

Page 37

2016/17 28 
Locally, there has been growth in the number of companies registered with
SDP in recent years, highlighting that an increasing number of local firms are
aware of the opportunities afforded through public procurement. 
However, Moray underperforms in this measure against all other local
authorities, other than the three which are island based. This demonstrates
the need to expand current awareness raising activities to ensure more
businesses are engaged. The Community Wealth Building (CWB) approach
being developed will assist with this, through coordinating the supplier
development support available for local businesses across public sector
anchors. 
6. OUTPUT INDICATORS 
6.1 OP1 Number of Businesses Supported by Council Economic
Development Activity 
This indicator shows the number of businesses which were directly supported
on a one to one basis, as opposed to those recorded in indicator A2. 
An amended data collection template was trialled for 2020/21 to assist in
collating the data for an online SLAED indicator dashboard. However, many
Councils were not able to provide the requested breakdowns for business
support, and in some cases did not have capacity to respond due to
administering Covid-19 support. 
Year Businesses Supported
2020/21 0
2019/20 253
2018/19 13
2017/18 71
2016/17 6 
It is important to note that Covid-19 financial support for businesses is not
covered under this indicator. Council economic development and business
support teams were redeployed to administer Covid-19 grants, therefore day
to day assistance, as counted in this indicator, was limited or temporarily
suspended. During 2020/21, Moray Council administered and paid out Covid-
19 Business Support Funds to a value of £33,540,176. This provided a vital
lifeline for the local business community. 
6.2 OP2 Number of Business Gateway Support Unique Customer Accounts 
This indicator shows the support delivered by Business Gateway through the
number of business accounts that have received support. Each account is
recorded only once even if support has been provided on multiple occasions. 
Year Unique Customer Accounts
2020/21 689
Page 37

Page 38

2019/20 746
2018/19 804
2017/18 929 
Local data shows a year on year decrease in the number of businesses
supported. This follows the trend nationally, where there has also been a
slight decrease in the number of businesses supported overall. 
6.3 OP3 Number of Companies Assisted by Scottish Development
International 
This is a measure of support delivered to local businesses by Scottish
Development International (SDI) to provide assistance with export activity.
There was a significant year on year reduction in the number of businesses
supported nationally, which could be reflective of the additional barriers
companies are facing as a result of Covid-19 and Brexit. This reduction was
replicated locally. 
Year Unique Customer Accounts
2020/21 21
2019/20 31
2018/19 32
2017/18 45
2016/17 43 
To support the work of SDI, additional export support is available locally
through Business Gateway. This 1-2-1 consultancy provision is designed to
help mitigate the impacts of Brexit and was launched as part of the Economic
Recovery Plan. This provided support to 16 businesses, with a total of 29
days of support delivered through the programme, up to March 2021. 
6.4 OP4 Number of Unemployed People that have Participated in Council
Funded or Operated Employability Activities 
This indicator provides a measure of the total number of people who have
participated in employability activities funded and/or operated by the Council.
Employability services cover a range of activities and support aimed at
addressing economic inactivity and unemployment. 
Year Participants
2020/21 198*
2019/20 480
2018/19 712
2017/18 716
2016/17 423 
*The data above has been incorrectly recorded. The correct number of
participants for 2020/21 is 198, though this has been reported as 27. 
This was still a significant reduction in the number of unemployed people who
participated in employability activities in Moray during the year. Moray
Training had been offering support through the Employability Fund but this
Page 38

Page 39

was disbanded during Covid-19 and employment support services were also
stopped due to the pandemic. 
6.5 OP5 Percentage of Immediately Available Employment Land 
OP5 is a measure of all land that is fully serviced and immediately available
for business use. It provides an assessment of Council performance in being
prepared for supporting business expansion and attracting inward investment.   
Year Employment Land
2020/21 34.8%
2019/20 24.2%
2018/19 49.0% 
Moray is currently performing slightly below the Scottish average, which sits at
39.2%. However, further expansion or development of industrial units in
Speyside and the East of Moray is being progressed as part of the Economic
Recovery Plan activity. 
6.6 OP6 Number of Businesses Participating in Supplier Development
Programme 
The data used in this indicator is provided directly by the SDP and counts the
number of businesses that are active following registration with the
programme. 
Year Business Participants
2020/21 11
2019/20 24
2018/19 24 
There was reduced participation from Moray businesses in comparison to the
previous year, which was reflected among many similar sized local
authorities. However, as this indicator data is collected nationally, it does not
always capture the full extent of participation in SDP events from Moray
businesses. 
7. OUTCOME INDICATORS 
7.1 OC1 Gross Value Added per Capita 
Gross Value Added (GVA) is used to assess the relative economic health and
wealth of areas. It measures the value of goods and services produced in an
area per head of population. GVA tends to be higher in areas with more
business diversity or where there are significant sectors that are highly capital
intensive, such as oil and gas. 
Year GVA in Moray GVA in Scotland
2019 £36,356 £42,122 
Page 39

Page 40

In previous years, the data included in this indicator was provided for NUTS3
regions, so reporting for Moray was based on the data for Inverness, Nairn,
Moray, Badenoch and Strathspey. However, the data included in the most
recent report, for 2019, is now broken down by local authority. It demonstrates
that GVA per capita in Moray is below the Scottish average, though Moray
outperforms many other similar sized local authorities. 
7.2 OC2 Gross Weekly Earnings 
This indicator measures the median gross weekly earnings of full-time
employees within Moray, on both a residence-based and workplace-based
basis. The residence-based data accounts for people living in Moray,
regardless of the council area in which they work. The workplace-based data
includes those that work in Moray, regardless of the council area in which they
reside. 
Residence Based
Year Moray Scotland
2020 £565.80 £622.00
2019 £561.60 £577.70
2018 £527.20 £562.70
2017 £497.90 £547.70
2016 £498.70 £536.60 
Workforce Based
Year Moray Scotland
2020 £579.00 £622.40
2019 £569.90 £576.70
2018 £549.80 £563.20
2017 £498.10 £547.30
2016 £491.80 £535.00 
On both measures, the median salaries in Moray are below those of the
Scottish average. While the gap had been closing, it has grown significantly in
the past year. Gross weekly earnings have grown in the majority of local
authority areas, though appear to have stagnated across the north east, in
Moray, Aberdeen, and Aberdeenshire. This may be linked to the downturn in
the oil and gas industry, caused by reduced demand for fuel early in the
pandemic. It should be noted that the data does not account for the salaries of
members of the armed forces or the self-employed. 
7.3 OC3 Employment Rate 
The employment rate is calculated from the number of people aged 16-64 that
were in employment in 2020/21 as a percentage of the total 16-64 population. 
Year Employment Rate in
Moray
Employment Rate in
Scotland
2020/21 72.7% 72.8%
2019/20 76.4% 74.5%
2018/19 74.4% 74.5%
2017/18 73.8% 74.3%
Page 40

Page 41

2016/17 73.5% 73.4% 
The employment rate for Moray was almost identical to that of the Scottish
average, though both had fallen from the previous year as the impacts of
furlough and social restrictions were felt early in the pandemic. However, in
Moray the employment rate fell by 3.7% on the previous year, where it had
only fallen by 1.7% across Scotland. This was likely influenced by the
structure of the economy, where Moray has a higher proportion of people
employed in the sectors that were most exposed to the effects of Covid-19
(manufacturing, construction, retail and wholesale, accommodation and food
services, arts, entertainment and recreation), than the national average. 
7.4 OC4 New Business Starts per 10,000 Working Age Population 
This indicator assists in measuring the level of entrepreneurial activity within
the local authority area. It counts the number of business births per 10,000 of
the 16-64 year old population (excluding sole traders). 
Year Business Starts in
Moray
Business Starts in
Scotland
2020 38 51
2019 45 62
2018 50 59
2017 48 64
2016 50 62 
The historic trend of Moray having fewer start-ups than across Scotland was
maintained in 2020, with both seeing a similar decrease in the level of
business births throughout the first year of the pandemic. Much like the impact
on other sectors of the economy, this is likely to be reflective of the barriers to
entrepreneurship caused as a result of Covid-19. 
7.5 OC5 Business Survival Rate (3 Year) 
OC5 measures the number of business start-ups in an area in terms of their
three-year survival rate, though again excluding sole traders. 
Year Moray 3 Year
Survival Rate
Scotland 3 Year
Survival Rate
2017-2020 58.7% 55.9%
2016-2019 63.2% 56.5%
2015-2018 63.3% 56.0%
2014-2017 63.0% 60.0%
2013-2016 64.9% 62.1% 
Moray has had a consistently higher survival rate than for Scotland overall,
which remains the case. However, the pandemic has so far had little impact
overall on the sustainability of businesses across Scotland, with only a 0.7%
decrease in the business survival rate. At a local level, it appears Moray
businesses have felt the impacts of the pandemic more acutely, with the
business survival rate falling by 4.5%. This suggests that Moray businesses
lack the resilience to survive economic shocks of the magnitude seen since
Page 41

Page 42

the start of the pandemic. The business support measures developed via the
Economic Recovery Plan have been targeted towards building business
resilience and sustainability to address this. 
7.6 OC6 Claimants in Receipt of Out-of-Work Benefits 
OC6 shows the percentage of working age people claiming either Job
Seekers Allowance or Universal Credit, at both a Moray and Scotland level. 
Year Moray Working Age
People Claiming
Unemployment Benefits
Scotland Working Age
People Claiming
Unemployment Benefits
2021 5.1% 6.1%
2020 2.7% 3.3%
2019 2.6% 3.1%
2018 2.0% 2.6% 
While there remains a lower proportion of people in Moray claiming
unemployment benefits than in Scotland, the rate for both has increased
significantly. Factors resulting from the pandemic, such as increased
redundancies, failing businesses, and a lack of employment opportunities, are
likely to have influenced this increase. 
7.7 OC7 Working Age Population with Low/No Qualifications 
This indicator shows the percentage of people aged 16-64 that possess either
no formal qualifications, or qualifications at SCQF (Scottish Credit and
Qualifications Framework) level 4 or below. 
Year Moray Working Age
Population with Low or
No Qualifications 
Scotland Working Age
Population with Low or
No Qualifications
2020 8.5% 9.7%
2019 11.6% 11.6%
2018 11.2% 11.6%
2017 12.2% 10.8%
2016 12.8%  11.9% 
In Moray, the percentage of people with low or no qualifications has been on a
downward trajectory and is now below the overall rate for Scotland. 
7.8 OC8 Town Vacancy Rate 
The Town Vacancy Rate provides a measure of vacant retail units in Moray’s
main town centres (Elgin, Forres, Lossiemouth, Keith, and Buckie) as a
percentage of the total available retail units. This can be used to assess the
relative vibrancy of town centres. 
Year Moray Town Centre
Vacancy Rate 
Scotland Town Centre
Vacancy Rate
2021 10.9% 9.2%
2020 6.9% 11.7%
Page 42

Page 43

2019 6.9% 10.0%
2018 9.9% 11.5%
2017 11.9% 10.2% 
The rate of growth in vacancy rates in Moray is significant, and demonstrates
the likely failure of numerous businesses in the retail sector as a result of the
lack of consumer demand. Nationally, the decrease in vacancy rate overall
must be analysed in the context of only 25 of the 32 local authorities having
capacity to provide a return for this data. Therefore, the reduction may not be
fully representative of the town centre landscape across Scotland. 
7.9 OC9 Number of Business Gateway start-ups that are Trading 
This is a measure of the number of start-up businesses supported by the local
Business Gateway branch that have begun trading. 
Year Moray Start-Ups that are
Trading
Scotland Start-Ups that
are Trading
2020/21 91 6,117
2019/20 155 8,964
2018/19 120 9,083
2017/18 128 9,129
2016/17 132 8,983 
Like many of the other indicators linked to entrepreneurial activity, there has
been a sharp decline in this indicator, as a result of reduced business activity
throughout the early stages of the pandemic. 
7.10 OC11 Leverage of External Funding 
The purpose of this indicator is to assess the value of external funding
leveraged in as match to the Council’s own financial contribution towards
project delivery. This usually includes funding through the European Union,
Scottish Government, UK Government, alongside grant funding and private
investment.   
Year Moray Funding Leverage
per £1 of Investment
Scotland Funding
Leverage per £1 of
Investment
2020/21 £1: £2.22 £1: £2.37
2019/20 £1: £2.77 £1: £1.91
2018/19 £1: £1.29  £1: £1.63
2017/18 £1: £2.66 £1: £1.71
2016/17 £1: £3.69 £1: £1.54 
Moray has often outperformed the amount of leverage recorded at a national
level. However, in 2020/21, Moray has fallen below the average for Scotland
overall, with £2.22 leveraged for every £1 of Council investment. Relative
performance in leveraging funding is challenging to measure because each
local authority will be delivering projects and accessing investment at different
times. Dundee City Council, Perth and Kinross Council, and Orkney Islands
Council all saw significant growths in their level of leveraged funding in
Page 43

Page 44

2020/21, which has accounted for much of the overall increase across
Scotland. 
7.11 OC12 Number of Planned New Jobs from Completed Inward Investment
Projects and Number of Planned Safeguarded Jobs 
This indicator provides a measure of job creation and job protection resulting
from inward investment activity, as a result of support provided through SDI.   
Year Moray Planned New Jobs Moray Planned
Safeguarded Jobs
2020/21 0 0
2019/20 64 0
2018/19 12 0
2017/18 19 0
2016/17 0 0 
Over 50% of Council’s had no planned new job in 2020/21, as was the case in
Moray. 
7.12 OC13 Number of Unemployed People that have Progressed to
Employment from Participation in Council Funded/Operated
Employability Activities 
OC13 tracks the progression of people who have participated in Council
employability services, who have then successfully moved into employment
from being unemployed. 
Year Moray Employment
Progression
Scotland Employment
Progression
2020/21 54* 7,271
2019/20 42 11,304
2018/19 62 15,328
2017/18 157 16,469
2016/17 83 17,020 
*The data above has been incorrectly recorded by SLAED. The correct
number of participants for 2020/21 is 54, though this has been reported as
105. 
There is a continuing downward trend in this indicator nationally. However,
employability services in Moray proved successful in increasing the number of
unemployed people supported back into work year on year. A suite of new
employability services were launched as part of the Economic Recovery Plan,
so this trend may continue for 2021/22. 
It is important to note that this indicator only captures those who are
supported into employment and not those who progress into other positive
destinations, such as education and training. 
Page 44

Page 45

8. INCLUSIVE GROWTH INDICATORS 
8.1 IG1 Gross Value Added per hour worked and per job filled 
These indicators are recommended for use for the Office for National
Statistics (ONS) to measure productivity. 
Year Moray  Scotland
GVA per hour worked  2019 £33.50 £33.60
GVA per job filled  2019 £49,701 £52,252 
Previously, as was the case for OC1, data for these indicators was recorded
for Inverness, Nairn, Moray, Badenoch and Strathspey. It is now recorded at a
local authority level, so for this year the data is Moray specific. Following this
transition there has been minimal change in the GVA per hour worked, which
remains broadly similar to the Scottish average. However, Moray’s
performance for GVA per job filled is below the Scottish average, where it had
previously been similar when recorded at a regional level. 
8.2 IG2 Underemployment 
Underemployment is defined as a person aged 16 and over who is in
employment and would like to work longer hours in their existing job, work an
additional job, or find a different job with more hours. 
Year Moray Underemployment Scotland Underemployment
2020 10.4% 8.1%
2019 8.8% 7.1%
2018 6.2% 7.4%
2017 8.4% 8.0% 
In the last two years, there have been more people in Moray who are seeking
work with more hours than the national average. It would be expected for this
rate to fall, both locally and nationally, in the years ahead due to the lack of
supply in the labour market as we have begun to emerge from the pandemic. 
8.3 IG3 5 year % change in median income vs lowest quintile 
IG3 is a crucial indicator in assessing the level of inequality in the Moray
economy. It measures the percentage change in gross weekly earnings over
a five-year period between earners in the lowest quintile and median earners. 
Year Moray  Scotland 
2016/21 -9.7% -2.6%
2015/20 6.1% -4.3%
2014/19 6.1% -4.3%
2013/18 0.1% -3.1% 
Between 2016 and 2021, Moray has successfully reduced the inequality gap
between median earners and those in the lowest quintile. Only Falkirk Council
and East Ayrshire Council had reduced their earning gap by a larger
Page 45

Page 46

percentage over this period. However, it should be noted that data for IG3 is
survey based and therefore subject to a large margin of error at a local
authority level compared to nationally. 
8.4 IG5 Percentage of Employees earning less than Living Wage 
This indicator measures the proportion of employees who are 18+ that are
earning less than the Living Wage. This is calculated using gross hourly
earnings, excluding any overtime. 
Year Moray  Scotland 
2020 21.5% 15.1%
2019 24.0% 16.9%
2018 27.4% 19.4%
2017 24.9% 18.4% 
Moray remains above the national average for this indicator, though the rate
has continued on a downward trend and the gap is closing. Data is gathered
using sample surveys and apportioned locally so is not always statistically
accurate at a local level. 
8.5 IG6 Percentage of Participation in Education, Employment & Training by
16-19 year olds 
IG6 provides a measure of the percentage of 16-19 year olds that remain is
positive destinations, meaning they are participating in either education,
employment or training. 
Year Moray  Scotland 
2021 91.8% 92.2%
2020 93.5% 92.1%
2019 91.3% 91.6%
2018 91.2% 91.8% 
For this measure Moray had been performing above the national average, but
this rate has fallen by 1.7% in 2021, and now sits slightly below the rate for
Scotland as a whole. This may be a result of there being reduced employment
opportunities locally as a result of the pandemic. 
8.6 IG7 Percentage of premises unable to access 10Mbit/s broadband 
This indicator provides an indication of the local level of digital inclusion. It
measures the percentage of premises which are unable to access 10Mbit/s
broadband. 
Year Moray  Scotland 
2021 7.1% 4.2%
2020 7.0% 4.2%
2019 7.3% 4.8%
2018 9.2% 6.1% 
Page 46

Page 47

Moray has a consistently higher percentage of properties without access to
sufficient broadband speeds, than Scotland as a whole. This is true of the
majority of rural local authorities, due to the higher cost of infrastructure
provision. The Scottish Government’s R100 programme is targeted towards
addressing this issue, with the North Lot (which includes Moray) awarded to
BT in December 2020. This has become even more of a priority issue to
resolve since the start of the pandemic, due to the increased number of
people now remote working from home. 
8.7 IG8 Percentage of premises able to access Superfast Broadband 
Conversely to IG7, this indicator reports on the percentage of premises which
have access to superfast broadband, with minimum speeds of 30Mbit/s.
Again, this provides a measure of digital inclusion, as connectivity is essential
for local economies to remain competitive. 
Year Moray  Scotland 
2021 84.3% 90.1%
2020 84.6% 93.3%
2019 84.2% 89.6%
2018 83.0% 91.1% 
As with the previous indicator, the Moray percentage remains below the
Scottish average. The R100 scheme is focussed upon providing full fibre
connectivity, with minimum speeds of 30Mbit/s, so this percentage should
increase in yeas ahead as the network is rolled out. 
8.8 IG9 Percentage of Good or Very Good Life Satisfaction 
This is a new indicator for 2020/21 and reflects the increasing focus within
Scotland around creation of wellbeing and inclusive economies. The data is
collated from the ONS Wellbeing Survey. 
Year Moray  Scotland 
2020/21 79.6% 76.3% 
Moray records a higher rate of positive life satisfaction among residents than
the Scottish average. Only 6 local authorities record a higher percentage than
Moray, with all but one of those also being largely rural areas, demonstrating
the benefits of living in a rural environment. 
8.9 IG10 CO2 emissions per capita 
Like IG9, this is also a new indicator for 2020/21. It is included in the Indicator
Framework Report to account for the increased focus upon improving
wellbeing and tackling the climate change emergency. 
Year Moray CO2 per capita Scotland CO2 per capita
2019 6.5 tCO2 5.7 tCO2 
Page 47

Page 48

Using the 2019 data, Moray produced a higher level of CO2 emissions per
capita, than Scotland as a whole. This may be linked to the scale of the
manufacturing sector in Moray and associated transport logistics. Supporting
communities and private enterprises in the transition to net zero will be key in
reducing emissions across the area. 
9. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) 
Effective monitoring and review of economic activity supports the
corporate plan priority of promoting economic development and growth,
as well as the LOIP priority of a growing and sustainable economy.   
(b) Policy and Legal 
There are no policy and legal issues arising directly from this report. 
(c) Financial implications 
There are no financial implications arising directly from this report. 
(d) Risk Implications 
There are no risk implications arising directly from this report. 
(e) Staffing Implications 
There are no additional staffing implications arising directly from this
report. 
(f) Property 
There are no property issues arising directly from this report. 
(g) Equalities/Socio Economic Impact 
The SLAED Indicator Framework Report provides essential data for
monitoring the socio economic health of Moray and has implications in
assessing equality of opportunity for people from vulnerable and
disadvantaged backgrounds. 
(h) Climate Change and Biodiversity Impacts 
There are no biodiversity issues arising directly from this report.
However, indicator IG10 records CO2 emissions per capita, which is a
critical performance measure in the Council’s transition towards reaching
net zero. 
Page 48

Page 49

(i) Consultations 
Depute Chief Executive (Economy, Environment and Finance), the Head
of Economic Growth and Development, and Principal Climate Change
Officer have been consulted and their comments included in the report. 
7. CONCLUSION 
7.1 The SLAED Indicator Framework Report demonstrates the scale of impacts
upon the Moray economy as a result of Brexit and the COVID-19 pandemic.
The Moray Growth Deal and range of measures proposed within the
Economic Recovery Plan have been targeted towards addressing and
mitigating against these impacts. Future Indicator Framework Reports from
SLAED will help demonstrate the effectiveness of these measures and the
speed of economic recovery. 
Author of Report: Chris Muir, Senior Officer Economic Strategy and
Development 
Background Papers: SLAED Indicators Framework Report 2020-21 
Ref: 
Page 49

Page 50

Page 50

Page 51

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 21 JUNE 2022                                                                                                       
SUBJECT: PERFORMANCE REPORT (ECONOMIC GROWTH AND
DEVELOPMENT SERVICES) – PERIOD TO MARCH 2022 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the performance of the service for the period to 31
March 2022. 
1.2 This report is submitted to Council in terms of Section III (A) (4) of the
Council's Scheme of Administration to monitor performance of the services
within the Committee’s remit in accordance with the Council’s performance
management framework. 
2. RECOMMENDATION 
2.1 It is recommended that Committee: 
(i) scrutinises performance in the areas of Service Planning, Service
Performance and other related data to the end of March 2022; 
(ii) notes the actions being taken to improve performance where
required. 
3. BACKGROUND 
3.1 On 7 August 2019, the Moray Council, approved a revised Performance
Management Framework for services (para 5 of the minute refers).   
4. SERVICE PLANNING 
4.1 Each service plan sets out the planned strategic and service level priorities
and outcomes it intends to deliver in the coming year aligning closely with
financial planning, corporate and community planning partnership strategic
priorities. This report provides an interim update on progress on the service
plan, key outcomes and performance indicators. The Committee is invited to
review progress to secure assurance that it is satisfactory and to provide
scrutiny and further direction where performance requires attention.
Item 10
Page 51

Page 52

4.2 The narrative included is by exception, links to Service Plan Actions and
Performance Indicators can be accessed within the Background Papers
section at the end of this report. 
Strategic Outcomes - successes 
4.2 The Local Employability Partnership enables a collaborative approach to
employability with good network support provided through the employability
consortium.  Future funding the Partnership has also been confirmed. 
(ACTION EG&D20-22.S4.1.2b). 
Strategic Outcomes – challenges and actions to support 
4.3 Council led Growth Deal projects are progressing, albeit out with original due
dates; good progress has been made in working towards full business case. 
On hold due to the pandemic, the Moray Skills Investment Plan has been
superseded by the review of the Moray Economic Strategy, which will provide
direction for this work. (ACTIONS EG&D20-22.S4.1.2a-b)   
Service Level Outcomes - successes 
4.4  The 2021-22 Building Standards Annual Performance report was submitted to
the Scottish Government as planned. (ACTION: EG&D20-22.S5.2) 
Service Level Outcomes – challenges and actions to support 
Page 52

Page 53

4.5 In managing the changes of implementing the secondary legislation and
guidance issued by Scottish Government in relation to the Planning Scotland
Act 2019, the review of the revised programme of work continues out with the
original due date of March 2022.  Phase 2 of the Planning Development
Rights has now been released. (ACTION: EG&D20-22.S5.1) 
Recovery and Renewal – successes 
4.6 Support to businesses continued through funding awards and delivery of
Economic Recovery Plan actions; (ACTION EG&D20-22.S6.1.2) 
• 9 businesses received a total of £13k from the Business Ventilation Fund,
helping small and medium sized businesses (SMEs) improve their
ventilation, with claims up to £2,500 per eligible premise to recover costs of
work to improve ventilation and air quality
• 211 businesses received the Hospitality Business Support Top Up, 245 the
Hospitality and Leisure Business Support Top Up and 41 Public House
Table Services Restriction funding, by way of a one-off payment based on
rateable value for those that have lost bookings during key trading periods. 
Payments totalled around £1.5m
• 2 pop-up shops were launched in Buckie, a scheme supporting business to
try out a High Street presence on a 4 weekly basis, having been
successfully trading both are seeking a permanent basis to trade
• 179 businesses registered for the Scotland Loves Local Moray Gift Card
Scheme, launched in November 2021.  Further dedicated support to the
scheme has been committed for the 2022-23 period
• 51 businesses received grants of £1.2m through the Town Centre Capital
Fund to transform empty space into living space and also convert large
retail units into smaller units. When this comes to fruition it is expected to
lead to investments worth £3.8m, however, construction costs continue to
rise preventing, or challenging, the completion of projects
• 16 SMEs received one-to-one support from Business Gateway over 29
days on post-Brexit procurement, three of which have high exposure to EU
markets.  In the year ended March 2022, Business Gateway assisted 123
new ventures, an increase of around one third compared to the same
period last year.  Since its launch in September 2021 until its closure in
March 2022, £75k of Business Start Up Grants have been awarded to 50
businesses. 
Recovery and Renewal – challenges and actions to support 
4.7 Nothing to report. 
5. SERVICE PERFORMANCE 
5.1  In line with the Performance Management Framework, operational
performance is reviewed quarterly by departmental management.  Areas
performing well and/or areas subject to a decreasing trend or where
benchmarking results show performance significantly below comparators will
be reported to this committee for member scrutiny. 
Page 53

Page 54

5.2 Initial publication of 2020-21 Local Government Benchmarking Framework
Indicators in February 2022 will be refreshed in early June.  The full suite can
be viewed using the My Local Council tool.  Published indicators for this
service have been incorporated within the relevant section of this report
depending on whether results are used to evidence progress against
strategic, service level or operational priorities.  All results relating to
Economic Growth have been provided, although some are not within the
control of the service. 
5.3 Report is by exception, links to Service Performance Indicators can be
accessed within the Background Papers at the end of this report. 
Operational Indicators - successes 
5.4 Building Standards exceeded performance targets in the percentage of
building warrant and amendments issued. (INDICATORS ENVDV-BS-
KPO1(A-B) 
5.5 Local Government Benchmarking Framework (LGBF) results were published
for 2020-21 allowing comparisons to be made.  The cost of planning and
building standards per planning application and the average time per
application results have slightly increased but both feature in the top 8 of 32
local authorities. 
Operational Indicators - challenges and actions to support 
5.6 Environmental Health Food Safety Inspections have been in abeyance since
March 2020 due to the pandemic, inspection of high priority premises began
in September 2021. (INDICATORS ENVDV-069a, 070a, 259a, 410a, 070c) 
5.7 In the quarter to March 2022, the average time for building warrants to be
issued increased to 88 days compared to 62 day in the same quarter 4 last
year due to the continued impact of Covid and extended period to investigate
issues. (INDICATOR ENVDV-BS-KPO1(A)) 
7
0
32
8
SERVICE PERFORMANCE PI'S
Achieving
Target
Within
Target
Below
Target
Data Only
Data not
available
4
Page 54

Page 55

6. OTHER PERFORMANCE RELATED DATA 
Complaints & MP/MSP Enquiries  
6.1  In line with the Performance Management Framework, complaints are
reviewed quarterly by departmental management in terms of time taken to
respond, outcome and learning points. Detailed tables can be accessed within
the Background Papers section of this report. 
6.2 There were 12 complaints closed in the half year ended March 2022, less
than half the number closed in the half year ended September 2021. Six
complaints were closed at frontline with six at investigative stages. The
average time to respond was well within the target 3 and 20 working days
respectively. Five complaints were upheld with no obvious service wide
learning, corrective actions were put in place for each. 
6.3 In the second half of 2021/22, the service dealt with 49 enquiries, the majority 
(45%) concerning Environmental Health and Planning and Development 
matters. 
Other Performance (not included within Service Plan) 
6.4 Nothing to report. 
Case Studies 
6.5 Nothing to report. 
Consultation and Engagement 
6.6 Nothing to report. 
7. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Performance measurement is used to ensure the efficient and
sustainable delivery of services to meet the Council’s priorities in both
the Corporate Plan and the LOIP. 
(b) Policy and Legal
The Council has a statutory requirement to publish a range of
information that will demonstrate that it is securing best value and assist
in comparing performance both over time and between authorities where
appropriate. 
(c) Financial implications
None. 
(d) Risk Implications
None. 
Page 55

Page 56

(e) Staffing Implications
None. 
(f) Property
None. 
(g) Equalities/Socio Economic Impact
An Equality Impact Assessment is not required as this report is to inform
the Committee on performance. 
(h) Consultations 
The Head of Economic Growth & Development Services, Depute Chief
Executive (Economy, Environment & Finance) and Service Managers,
have been consulted with any comments received incorporated into this
report. 
8. CONCLUSION 
8.1 As at 31 March 2022, five Service Plan outcomes were due to complete,
of which three have been achieved.  Incomplete actions are progressing
out with original timescales. The plan overall is 92% complete.   
Author of Report: Christopher Dewhurst, Research & Information Officer
Background Papers: Service Plan Actions
Service Plan Performance Indicators
Service Performance Indicators 
Complaints Monitoring Reports
Page 56

Page 57

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 21 JUNE 2022 
SUBJECT: PERFORMANCE REPORT (ENVIRONMENTAL AND
COMMERCIAL SERVICES) – PERIOD TO MARCH 2022 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the performance of the service for the period to 31
March 2022. 
1.2 This report is submitted to Committee in terms of Section III (A) (4) and (F)
(33) of the Council's Scheme of Administration to provide, develop and
monitor services within this committee’s remit in accordance with the Council’s
Performance Management Framework. 
2. RECOMMENDATION 
2.1  It is recommended that Committee: 
(i) scrutinises performance in the areas of Service Planning, Service
Performance and other related data to the end of March 2022;  
(ii) notes the actions being taken to improve performance where
required. 
3. BACKGROUND 
3.1 On 7 August 2019, the Moray Council approved a revised Performance
Management Framework for services (para 5 of the minute refers). 
4. SERVICE PLANNING 
4.1 Each service plan sets out the strategic and service level priorities and
outcomes it intends to deliver in the coming year aligning closely with financial
planning, corporate and community planning partnership strategic priorities. 
This report provides an interim update on progress on the service plan, key
outcomes and performance indicators.  Committee is invited to review
progress to secure assurance that is satisfactory and to provide scrutiny and
further direction where performance requires attention.  
Item 11
Page 57

Page 58

4.2 The narrative included is by exception, links to Service Plan Actions and
Performance Indicators can be accessed within the Background Papers
section of this report.   
Strategic Outcomes – successes 
4.3 During 2021/22, work to promote and develop active and green travel
continued.  The easing of COVID restrictions has allowed the return of
Bikeability lessons with 36 primary schools taking part.  Over 200k sustainable
primary school journeys were recorded by the Travel Tracker Programme, the
highest result recorded to date.   Availability of electric car charging points has
been extended with 16 new charging points commissioned; taking the total
number to 41.  Two further chargers in Hopeman and Burghead will be funded
through the Local Authority Installation Programme (LAIP). (ECS20-25 -
Section 4(ai), PIs ECSTTM01, 03, 05) 
Strategic Outcomes – challenges and actions to support 
4.4 Nothing to report. 
Service Level Outcomes – successes 
4.5 Discussions are ongoing with the developer on shore side operations and
maintenance base and pier infrastructure at Buckie Harbour as part of the
Moray West wind farm project.  Design and lease agreements are well
advanced and progress is as expected. (Action ECS20-25 Section 5(f)) 
Service Level Outcomes – challenges and actions to support 
4.6 Delivery of the Capital and Revenue Programme for 2021/22 is 93% complete
with some schemes delayed due to conflicting emergency and planned work. 
Schemes not delivered this year will be assessed for inclusion in the 2022/23
programme. (Action ECS20-25 Section 5ai, PI ECSRM01)   
4.7 Commencement of the work on the improvement scheme at the Wards/Edgar
Road junction was subject to significant delay due to the impact of the
pandemic on the procurement process, however work began on site mid-
February and is expected to complete in June. (Action ECS20-25 Section 5b) 
RAG
STRATEGIC
LEVEL Growing, diverse & sustainable economy 45%
COVID Service Delivery Recovery - Roads
Maintenance 97%
Establishing Joint Energy from Waste 75%
Growing, diverse & sustainable economy 70%
Improving our Operations 74%
Improving the Transportation Network 85%
RECOVERY &
RENEWAL Spaces for People 100%
78%
SERVICE PLAN OUTCOMES
OVERALL PLAN PROGRESS
SERVICE
LEVEL
Comment:  Two actions have not met target timescales within the current
Environmental and Commercial Services Service Plan.  Issues have also
been reported with two longer term actions however steps have been taken
to address delays and work is ongoing. Overall, the plan is 78% complete.
Page 58

Page 59

4.8 Issues with subcontractors around mechanical installation have led to slight
delays with the Joint Energy from Waste project, impacting on the start of hot
commissioning work.  Despite this, the last major civil structure work has
progressed and elements of cold commissioning have begun.  SEPA, having
concluded their thorough assessment, officially granted permission for the site
to operate and plans are in place for contractual commencement from 29
October 2022 albeit via contingency arrangements for actual waste
processing. (Action ECS20-25 Section 5c) 
4.9 Improving the rate of network bridge Principal Inspections is a long term
action within the Service Plan.  During 2021/22, all 26 planned arch bridge
inspections were completed, however just 4 of the 32 planned non-arch
bridge inspections were undertaken.  Staff training to deliver non arch
inspections is ongoing with approval pending for Capital Plan funding to
outsource more complex inspections. (Action ECS20-25 Section 5(d), PI
ECSCON01) 
Recovery and Renewal - successes 
4.10 Nothing to report. 
Recovery and Renewal – challenges and actions to support 
4.11 Nothing to report. 
5 SERVICE PERFORMANCE 
5.1 In line with Performance Management Framework, operational performance is
monitored quarterly by departmental management.  Areas performing well
and/or areas subject to a decreasing trend or where benchmarking results
show performance below comparators will be reported to this Committee for
member scrutiny. 
5.2 Initial publication of 2020-21 Local Government Benchmarking Framework
(LGBF) Indicators in February 2022 will be refreshed in early June.  The full
suite can be viewed using the My Local Council tool.  Published indicators for
this service have been incorporated within the relevant section of this report
depending on whether results are used evidence progress against strategic,
service plan or service performance priorities. 
5.3 The narrative included is by exception, links to Service Performance
Indicators can be accessed within the Background Papers section of this
report.   
Page 59

Page 60

Operational Indicators – successes 
5.4 Although the cost of parks and open spaces per 1,000 population increased
slightly in 2020/21 to £11,880, Moray’s ranking remained unchanged at 6th of
32 councils with costs 38% less than the national average of £19,112. (PI
C&L4) 
5.5 The net cost of waste collection fell in Moray from £40.34 to £34.78 in
2020/21.  This is the lowest in Scotland and 53% less than the national
average of £72.35. (PI ENV1a) 
5.6 Net costs of street cleaning per 1,000 population decreased from £7,581 to
£7,251 in 2020/21; 51% less than the national average.  Moray having moved
from 3rd to 5th ranked authority remain in the lowest quartile. (PI ENV3a) 
5.7 The cost of roads per kilometre fell from £7,193 to £4,301 in 2020/21. 54%
less than the national average of £9,379, moving Moray from 8th to 5th place in
terms of ranking.  Road Condition Indicator (RCI) data for 2020-22, shows
improvement across all road classifications, with Moray ranked 3rd for our
whole network in comparison against all other Scottish authorities (where 1 is
best). The RCI represents the percentage of road network that should be
considered for maintenance.  (PIs ENV4a-e, ECSRMLGBF06) 
Operational Indicators – challenges and actions to support 
5.8 From January 2022, all P1-5 pupils are eligible for free school meals.  Uptake
fell in quarter 4 to 59.3%, well below the 75% target.  Whole school uptake
improved slightly to 50.8% but again below target (60%).  To help improve
rates, a revised menu has been created using feedback from a recent
parent/carers survey.  This menu continues to comply with Food and Drink
(Scotland) regulations and initial monitoring, since the launch in April,
suggests meal options have been well received.  An action to improve the
school meal service along with uptake rates has been included in the
Environmental and Commercial Services Service Plan 2022/23.  (PIs
ECSEPBCC01 and 02) 
5.9 Net savings relating to the pool car scheme dropped to £64k.  Cars, dedicated
to service areas as part of COVID recovery plans have not met target mileage
while grey fleet claims have increased perhaps inferring ongoing concerns
around the spread of COVID.  Arrangements are now in place to return
underutilised cars to the general fleet and relaunch the scheme to encourage
pool car usage.  Moving forward, the base locations for the pool car fleet are
Page 60

Page 61

being reviewed to better reflect emerging work patterns and hybrid working
and facilitate better utilisation with a view to reducing the increases in grey
fleet mileage observed during the pandemic.  (PI ECSRMF03) 
5.10 In 2021/22, the average occupancy of paid car parks in Elgin was 45%. 
Although still below target (50%) the long term trend for this indicator is
improving with net income of £542k significantly higher than last year.  The
Pay by Phone app has proved popular, accounting for 19.4% of all car park
payments received.  (PIs ECSTCP01 and 02) 
5.11 Net unit costs for the Dial M Service remain above target (£5.20) at £6.72 per
passenger.  Although there are seasonal fluctuations, passenger numbers
and income indicate service recovery and with COVID support payments
included, net subsidy reduces to £4.56.  Over the summer period, along with
re-branding of the service to “m.connect”, progress will be made on a joint
promotional campaign with Stagecoach to rebuild passenger confidence and
promote the uptake of the U-22 concessionary travel pass.  (PI ECSTPT01) 
6 OTHER PERFORMANCE RELATED DATA 
Complaints & MP/MSP Enquiries 
6.1 In line with the Performance Management Framework, complaints are
reviewed quarterly by departmental management in terms of time taken to
respond, outcome and learning points.  Detailed tables can be accessed
within the Background Papers section of this report.   
6.2 During 2021/22, 166 complaints were received by Environmental and
Commercial Services; 15% less than 2020/21 and 46% less than 2019/20. 
During quarter 4 2021/22, the number of complaints received was the lowest
in the past three years at just 31. 
6.3 During quarter 4, 30 complaints were closed.  28 (93%) were closed as
frontline and 2 (7%) at investigative stage.  26 frontline complaints (93%) were
dealt with within the target timescale of 5 working days however both
investigative complaints took longer than anticipated with an average time for
a full response of 25 days.   
Page 61

Page 62

6.4 19 closed complaints during quarter 4 (63%) were upheld.  14 (74%) related
to Household Collections with continuing issues of missed bins due to crew
error or delays in the delivery of new bins.  To help address these complaints,
work practices and route details have been revised and the bin stock-take
procedure has been reviewed.  Standard lead time for the delivery of
replacement bins has also been updated (increasing from 10 to 28 days) and
the contact centre advised. 
6.5 In addition to complaints, 48 MP/MSP enquiries were dealt with during quarter
3 with a further 52 in quarter 4.  Most (96%) were dealt with within target
timescales. 
Other Performance (not included in the Service Plan) 
6.6 In January, the Catering Team received the Soil Association “Food for Life
Served Here” bronze award in recognition that a minimum of 75% of dishes
are freshly prepared and free from undesirable trans fats, sweeteners,
additives and all genetically modified ingredients.  The Head of Food at the
Soil Association also highlighted the work undertaken by the Team to build
relationships with local suppliers and serve nutritious and sustainably sourced
food.     
Case Studies 
6.7 In January, Visit Scotland awarded £363,298 to improve tourism sustainability
and accessibility in Moray.  Planned work includes a new car park and
upgraded foot path at Bow Fiddle Rock, a new overnight facility in Cullen and
electric vehicle charging points at various car parks across the area.   
Consultation and Engagement 
6.8 Throughout 2021/22, the Open Space team, supported by Community
Support Unit colleagues, engaged with communities, via a participatory
budgeting approach, on play park upgrades in Cullen, Findochty and Rothes 
Tender documents are expected shortly for Cullen and Findochty.  In Rothes,
installation of new equipment is scheduled for summer 2022 after the scope of
the project was extended due to successful community fundraising.  The next
community consultations will take place in Forres covering proposed upgrades
to Mannachie Park.  
Page 62

Page 63

6.9 A 12 week consultation began in January for the proposed Active Travel
Strategy 2022 to 2027.  Views were sought via a survey (available online and
at libraries) and through virtual events for both the public and identified
stakeholders.  Responses are currently being reviewed with the final Strategy
expected late 2022. 
7  SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Performance measurement is used to ensure the efficient and
sustainable delivery of services to meet the Council’s priorities in both
the Corporate Plan and the LOIP. 
(b) Policy and Legal
The Council has a statutory requirement to publish a range of
information that will demonstrate that it is securing best value and assist
in comparing performance both over time and between authorities where
appropriate. 
(c) Financial implications
None. 
(d) Risk Implications
None. 
(e) Staffing Implications
None. 
(f) Property
None. 
(g) Equalities/Socio Economic Impact
An Equality Impact Assessment is not needed because the report is to
inform the Committee on performance. 
(h) Climate Change and Biodiversity Impacts
None 
(i) Consultations
The Head of Environmental and Commercial Services, Depute Chief
Executive (Economy, Environment and Finance), Service Managers,
Legal Services Manager, the Equal Opportunities Officer, and L Rowan,
Committee Services Officer have been consulted with any comments
received incorporated into this report. 
8. CONCLUSIONS 
8.1 At the end of March 2022, the Environmental and Commercial Services
Service Plan is 78% complete.  Although two actions did not meet
anticipated target timescales, work is nearing completion at the
Page 63

Page 64

Wards/Edgar Road junction while Capital and Revenue Road
Maintenance schemes not delivered this year will be assessed for the
2022/23 programme. 
Author of Report: Suzanne Wilson, Research and Information Officer
Background Papers: Service Plan Actions 
Service Plan Performance Indicators
Service Performance Indicators
Complaints Monitoring Report 
Ref: SPMAN-524642768-731 
Page 64