Agenda Document Pack - Economic Development and Infrastructure Services Committee - 18/06/2024

Moray Council · 18 June 2024
Back to Economic Development and Infrastructure Services Committee — 18 June 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Economic Development and Infrastructure Services
Committee 
Tuesday, 18 June 2024 
NOTICE IS HEREBY GIVEN that a Meeting of the Economic Development and
Infrastructure Services Committee is to be held at Council Chambers, Council
Office, High Street, Elgin, IV30 1BX on Tuesday, 18 June 2024 at 09:30. 
BUSINESS 
1 Sederunt 
2 Declaration of Group Decisions and Members Interests * 
3 Minute of meeting dated 30 April 2024 7 - 14
4 Written Questions ** 
5 Economy, Environment and Finance Service Plans 2024-
25
Report by Depute Chief Executive (Economy, Environment and
Finance)  
15 - 46
6 ECS and EGD (Ec Dev) Revenue and Capital Budget
Monitoring to 31 March 2024
Report by Depute Chief Executive (Economy, Environment and
Finance)  
47 - 56
7 Performance Report (Economic Growth and
Development) - Period to March 2024
Report by Depute Chief Executive (Economy, Environment and
Finance)  
57 - 64
Page 1

Page 2

8 Performance Report (Environmental and Commercial
Services) - Period to March 2024
Report by Depute Chief Executive (Economy, Environment and
Finance)  
65 - 72
9 Road Safety Plan to 2030
Report by Depute Chief Executive (Economy, Environment and
Finance)  
73 -
134
10 Consultation Response Hitrans Draft Regional Transport
Strategy
Report by Depute Chief Executive (Economy, Environment and
Finance)  
135 -
302 
Information Reports - Not for Discussion at this Meeting
Any member wishing to call in a noting or information report from one
meeting shall give notice to Committee Services at least 48 hours
before the meeting for which the report is published. The Notice shall
be countersigned by one other elected member and shall explain the
reason for call in including any action sought. 
Information Report - Elgin Town Centre Parking
Enforcement
Report by Depute Chief Executive (Economy, Environment and
Finance)  
303 -
306 
Information Report - Sustainable Aviation Test
Environment Project
Report by Depute Chief Executive (Economy, Environment and
Finance)  
307 -
310 
Information Report - Moray Pathways Local
Employability Partnership Annual Investment Plan
(2024-2025)
Report by Depute Chief Executive (Economy, Environment and
Finance)  
311 -
324
Page 2

Page 3

Information Report - List of Property Transactions
Concluded Under Delegated Powers
Report by Depute Chief Executive (Economy, Environment and
Finance)  
325 -
342 
Summary of Economic Development and Infrastructure
Services Committee functions:
Roads Authority; Lighting Authority, Reservoirs Act 1975, Public
Passenger Transport; Flood Prevention; Twinning; Piers and Harbours
and Coast Protection; Industrial and Commercial Development;
Environmental Protection; Burial Grounds; Assistance to Industry or
Commerce; Public Conveniences; Council Transportation; Catering &
Cleaning; Land Reform (Scotland) Act 2003; Countryside Amenities;
Tourism, monitoring funding from European Programmes, youth
training and employment creation scheme and provide Architectural,
Quantity Surveying, Maintenance and Allied Property Services.     
Watching the Meeting
You can watch the webcast live by going to: 
http://www.moray.gov.uk/moray_standard/page_43661.html    
Webcasts are available to view for 1 year following the meeting.  
You can also attend the meeting in person, if you wish to do so,
please come to the High Street entrance door and a member of
staff will be let into the building. 
Page 3

Page 4

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how
the individual or members of the group will vote on any item(s) of business on
the Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any
relevant and competent business within the specified remits not already on the
agenda, to the Chair provided it is received by the Proper Officer or Committee
Services by 12 noon two working days prior to the day of the meeting.  A copy
of any written answer provided by the Chair will be tabled at the start of the
relevant section of the meeting.  The Member who has put the question may,
after the answer has been given, ask one supplementary question directly
related to the subject matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the
consent of the Chair. If a Member does not have the opportunity to put a
supplementary question because no time remains, then he or she can submit it
in writing to the Proper Officer who will arrange for a written answer to be
provided within 7 working days. 
Page 4

Page 5

MORAY COUNCIL 
Economic Development and Infrastructure Services
Committee 
SEDERUNT 
Councillor Marc Macrae  (Chair)
Councillor Amber Dunbar  (Depute Chair)  
Councillor Peter Bloomfield  (Member)
Councillor John Cowe  (Member)
Councillor John Divers  (Member)
Councillor Jérémie Fernandes  (Member)
Councillor David Gordon  (Member)
Councillor Juli Harris  (Member)
Councillor Sandy Keith  (Member)
Councillor Graham Leadbitter  (Member)
Councillor Paul McBain  (Member)
Councillor Shona Morrison  (Member)
Councillor John Stuart  (Member)
Councillor Draeyk van der Horn  (Member)
Councillor Sonya Warren  (Member)  
Clerk Name: Lissa Rowan
Clerk Telephone: 07765 741754
Clerk Email: committee.services@moray.gov.uk 
Page 5

Page 6

Page 6

Page 7

MORAY COUNCIL 
Minute of Meeting of the Economic Development and Infrastructure Services
Committee 
Tuesday, 30 April 2024 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor Peter Bloomfield, Councillor John Cowe, Councillor John Divers,
Councillor Amber Dunbar, Councillor David Gordon, Councillor Juli Harris,
Councillor Sandy Keith, Councillor Graham Leadbitter, Councillor Marc Macrae,
Councillor Paul McBain, Councillor Shona Morrison, Councillor John Stuart,
Councillor Draeyk van der Horn, Councillor Sonya Warren 
IN ATTENDANCE 
Depute Chief Executive (Economy, Environment and Finance), Head of
Environmental and Commercial Services, Acting Head of Economic Growth and
Development, Head of Housing and Property Services, Environmental Protection
Service Manager, Strategic Transport Services Manager, Consultancy
Manager, Strategic Planning and Development Manager, Vehicle Services and
Compliance Manager, Harbour Development Operations Manager, Mr R Adam,
Network Asset Engineer (Roads Maintenance), Mr W Burnish, Senior Engineer
(Flood Risk Management), Ms C English, Senior Project Manager, Property Asset
Manager,  Ms K Conti, Development Officer (Economic Growth and
Regeneration), Ms S Creswell, Community Wealth Building Officer, Legal Services
Manager and Mrs L Rowan, Committee Services Officer as Clerk to the
Committee.   
1         Chair 
Councillor Macrae, being Chair of the Economic Development and Infrastructure
Services Committee, chaired the meeting. 
2         Declaration of Group Decisions and Members Interests 
In terms of Standing Orders 21 and 23 of the Councillors’ Code of Conduct, there
were no declarations from Group Leaders or Spokespersons in regard to any prior
decisions taken on how Members will vote on any item on the agenda or any
declarations of Member’s interests in respect of any item on the agenda. 
3         Minutes 
The Minutes of the special meeting of the Economic Development and
Infrastructure Services (EDIS) Committee dated 12 December 2023 and the
meeting of the EDIS Committee dated 6 February 2024, were submitted and
approved.  
Item 3
Page 7

Page 8

4         Written Questions 
The Committee noted that no written questions had been submitted. 
5         Environmental Protection Revenue and Capital Budgets 2024-25 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing the Committee of the plans to deliver the
capital and revenue programme in Environmental Protection in 2024/25.  
Following consideration, the Committee unanimously agreed to: 
i. approve the plans to deliver the capital programme for 2024/25 as set out in
the report; 
ii. grant delegated authority to the Service Manager (Open Space, Waste
Management, Catering & Facilities) to proceed with necessary maintenance
works and prioritise the works in accordance with any budgetary restrictions; 
iii. approve the proposed use of the cemetery capital funds for increased
cemetery provision in Moray as set out in section 5 of the report; and 
iv. delegate authority to the Head of Environmental and Commercial Services to
apply for grants in support of the areas of work identified in sections 4 and 5 of
the report.   
6         Roads Maintenance Revenue and Capital Budget 2024-2025 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) which requested that the interim outturn position for
2023/24 be noted and that the detailed expenditure plans for the funds allocated
from the Revenue Budget 2024/25 for Roads Maintenance and the Capital Budget
2024/25, including resurfacing/reconstruction, surface dressing, footpaths,
drainage, replacement of lighting columns, and lighting enhancements, be
approved.  
Following consideration, the Committee unanimously agreed to: 
i. approve the detailed allocation of funds, from the Revenue and Capital Budget
2024/25, to Roads Maintenance activities, as outlined in Section 5 of the
report; 
ii. grant delegated authority to the Roads Maintenance Manager to proceed with
necessary roads maintenance works whilst noting that the Roads Maintenance
Manager will, as soon as possible, publish a main list of schemes, which can
be funded from the budget provision recommended in this report, and a
reserve list of desirable schemes, which cannot presently be funded, along
with a list of projects to be funded from the Capital allocation; and 
iii. note that the list of schemes will be drawn up in accordance with the principles
and objectives detailed in this report, in the Roads Asset Management Plan
and in the Capital Plan.
Page 8

Page 9

7         Transportation Capital and Revenue Budgets 2024-2025 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing the Committee of plans to deliver the capital
and revenue programme in Transportation for 2024/25.  
Following consideration, the Committee unanimously agreed to: 
i. approve the plans to deliver the capital and revenue programme for 2024/25
as set out in the report; 
ii. delegate authority to the Head of Environmental and Commercial Services to
apply for grants for the funding areas set out in the report at paras 5.16 and
7.14; and 
iii. approve the plans for expenditure of the Cycling Walking and Safer Routes
funding as set out in paras 7.11 and 7.12 of the report.   
8         Roads Asset Management Planning 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) presenting the latest information on the road network's
condition.  
Following consideration, the Committee unanimously agreed: 
i. to note the latest Road Condition Indicator (RCI) results for Moray Council; 
ii. that the RCI results continue to be monitored and reported back on an annual
basis to this committee; and 
iii. to note the clear commitment to the use of Road Asset Management Planning
in Moray Council.   
9         Coastal Adaptation Plans 
Under reference to paragraph 8 of the Minute of the meeting of this Committee
dated 8 February 2022, a report by the Depute Chief Executive (Economy,
Environment and Finance) informed the Committee of Moray Coastal adaptation
plans.  
The Committee joined the Chair in commending the Service for bringing forward
this significant piece of work and thereafter unanimously agreed to: 
i. adopt the Costal Adaptation Plan for managing coastline falling within the
Moray Council area; and 
ii. progress the case studies set out in section 6.2-6.4 of the report.  
Councillor Bloomfield left the meeting at this juncture.  
Page 9

Page 10

10         Long-Term Town Fund 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) which requested that the Committee delegate authority
regarding funding opportunities through the Elgin Town Board.  
The Committee joined the Chair in welcoming Mrs Beverly Smith to her first
Committee meeting in her new role as Acting Head of Economic Growth and
Development.  
Following consideration, the Committee unanimously agreed to approve delegation
to the Head of Economic Growth and Development in consultation with the Chief
Financial Officer and the Strategic Leadership Forum (SLF - extended for this
purpose as set out in the report) to develop and submit to the Elgin Town Board
priority packages relating to the themes of Community Safety and Security, High
Streets Heritage and Regeneration and Transport and Connectivity.   
11         Tourism Business Improvement District - Renewal Ballot 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) seeking the Committee's approval to support the
renewal ballot for the Tourism Business Improvement District (BID).  
Following consideration, the Committee unanimously agreed: 
i. for Economic Growth and Regeneration to continue to support the Tourism
BID through the undertaking of the renewal ballot; and 
ii. to note that a further report will be presented to Committee with full business
proposal and supporting five-year business plan, including levy details and any
potential future financial implications for the Council, and the assessment of
the Council’s right of veto.   
12         Cultural Quarter - Delivery Plan and Mapping 
Councillor Bloomfield re-joined the meeting during discussion of this item.  
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) which presented the Committee with two reports
outlined in Appendix 1 and Appendix 2. These were commissioned as part of the
Cultural Quarter Full Business Case to support the strategic, commercial and
financial case for the Cultural Quarter Project. They also offered solutions for the
implementation of the project in the context of wider cultural regeneration in Elgin
and Moray. Additionally, the report requested delegated authority in relation to
funding opportunities.  
Following consideration, the Committee unanimously agreed to: 
i. note the content of both reports as providing valuable supporting information
for the strategic case and proposed implementation of the Cultural Quarter
project as part of the Moray Growth Deal; and 
Page 10

Page 11

ii. delegate authority to the Head of Economic Growth and Development to
submit priority packages of connecting routes and public realm from the
Cultural Quarter Delivery Plan as shown in Appendix 1 to external funding
opportunities as they become available and, in the event match funding is
required, existing approved project funding will be utilised.   
13         Moray Community Wealth Building Strategy and Action Plan 
Under reference to paragraph 11 of the Minute of the meeting of this Committee
dated 20 June 2023, a report by the Depute Chief Executive (Economy,
Environment and Finance) presented the Committee with the Moray Community
Wealth Building Strategy (CWB) for approval, as set out in Appendix 1 of the
report.  
During discussion, Councillor Leadbitter recognised that this strategy was
significant in terms of economic development in Moray and expressed a wish to
highlight this new strategy to the UK and Scottish Governments. He moved that
that the Committee agree an additional recommendation for the Chair to write to
the Regional Economic Partnership and the Moray Economic Partnership
informing of the Council's recent adoption of the Moray Community Wealth
Building Strategy. This was unanimously agreed.  
Thereafter, the Committee unanimously agreed: 
i. to note the consultation that has taken place with Stakeholders; 
ii. to approve the Moray Community Wealth Building Strategy and Action Plan as
set out in Appendix 1 of the report; and 
iii. that the Chair write to the Regional Economic Partnership and the Moray
Economic Partnership informing of the Council's recent adoption of the Moray
Community Wealth Building Strategy.    
14         Suspension of Standing Orders 
The Chair sought the agreement of the Committee to suspend Standing Order 77
to allow the meeting to continue beyond 12:45 pm.  This was unanimously agreed.   
15         Zero Emission Fleet Replacement Strategy 
Under reference to paragraph 10 of the Minute of the meeting of this Committee
dated 7 February 2023, a report by the Depute Chief Executive (Economy,
Environment and Finance) provided the Committee with a strategic overview to
decarbonise the Council's fleet and meet the agreed net zero targets.  
Following consideration, the Committee unanimously agreed: 
i. to note the EV strategy proposed by Fleet Services to ensure the Council is
well placed to meet its ambitious net zero targets; 
ii. to note the council’s progress made to date in reducing fleet carbon emissions; 
Page 11

Page 12

iii. to note that options put forward within the strategy will require varying levels of
capital investment, and endorses the preferred option 2, which will be subject
to consideration as part of the standard financial planning process going
forward; 
iv. to note that the transition to a zero-emission fleet cannot progress at scale until
suitable charging infrastructure is in place following the depot review and
smarter working projects; 
v. that proposals for Ashgrove depot are developed as the council’s centralised
green depot with alternative infrastructure in place to allow development of net
zero alternatives; 
vi. to the Council exploring external funding opportunities for future hydrogen and
biogas pilots.   
16         Resumption of Meeting 
PRESENT 
Councillor Peter Bloomfield, Councillor John Cowe, Councillor John Divers,
Councillor Amber Dunbar, Councillor David Gordon, Councillor Juli Harris,
Councillor Sandy Keith, Councillor Graham Leadbitter, Councillor Marc Macrae,
Councillor Paul McBain, Councillor John Stuart, Councillor Draeyk van der Horn,
Councillor Sonya Warren 
APOLOGIES 
Councillor Shona Morrison 
IN ATTENDANCE 
Depute Chief Executive (Economy, Environment and Finance), Head of
Environmental and Commercial Services, Acting Head of Economic Growth and
Development, Head of Housing and Property Services, Strategic Transport
Services Manager, Consultancy Manager, Harbour Development Operations
Manager, Mr W Burnish, Senior Engineer (Flood Risk Management), Property
Asset Manager, Legal Services Manager and Mrs L Rowan, Committee Services
Officer as Clerk to the Committee. 
17         Flood Risk Management and Bridges Capital and Revenue Budgets
2024-25 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing the Committee of the Flood Risk
Management Schedule of Clearance and Repair for 2024/25.  
Following consideration, the Committee unanimously agreed: 
i. the Flood Risk Management Schedule of Clearance and Repair for 2024/25; 
Page 12

Page 13

ii. the proposed Schedules of Road Bridge Revenue and Capital Maintenance
Works and Non-network Bridge Capital Maintenance Works to be undertaken
for 2024/25; and
iii. to delegate authority to the Head of Environmental and Commercial Services
to apply for grant funding as set out in paragraph 3.23 of the report.   
18         Marine Safety and Operational Summary of 2023-24 and Q3-4 2023-24
Updates 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing the Committee on matters of Marine Safety
and compliance with the Port Marine Safety Code (PMSC) for the year 2023/24
including details of Q3 and Q4 2023/24.  
During his introduction, the Chair pointed out that, although the recommendation in
the report asked that a 3 yearly statement of compliance letter be written to the
Maritime and Coastguard Agency (MCA), this was no longer required as the MCA
had advised that they were deferring the 3 yearly compliance exercise.  This was
noted.  
During discussion, several health and safety concerns were highlighted in relation
to the harbours in Moray as a result of the incidents detailed within the report and it
was queried what measures were being taken to address these issues.  
In response, the Head of Environmental and Commercial Services reiterated the
Council's commitment to the safety of harbour users and staff. She noted that the
reported number of incidents is not unusually high compared to other similar
services within her remit, however acknowledged the need to review the report's
wording with her team to avoid causing unnecessary concern in the future.  
During further discussion surrounding the Weighbridge in Buckie, it was
acknowledged that the bridge is fully operational, yet there were questions raised
regarding its lack of use. Additionally, it was observed that debris from previous
roadworks remained at the exit of the weighbridge and it was asked if this could be
cleared.  
In response, the Head of Environmental and Commercial Services advised that the
Strategic Transport Services Manager and the Harbour Development Operations
Manager would look into why the weighbridge is underutilised and ensure the
debris at the exit is cleared.  
Following consideration, the Committee unanimously agreed to note:  
i. the safety performance, fulfilling their function as Duty Holder under the Port
Marine Safety Code (PMSC); 
ii. that the Head of Environmental and Commercial Services would review the
manner in which harbour incidents are reported; 
iii. that the Strategic Transport Services Manager and the Harbour Development
Operations Manager look into why the weighbridge is underutilised and ensure
the debris at the exit is cleared.   
Page 13

Page 14

19         Depot and Store Review 
Under reference to paragraph 13 of the meeting of this Committee dated 20 June
2023, a report by the Depute Chief Executive (Economy, Environment and
Finance) provided an update on the Depot and Store review progress and sought
approval for the outline business case and resource request.  
Following consideration, the Committee unanimously agreed: 
i. to approve the Outline Business Case for the Depot and Store Review; 
ii. to fund a project resource of a temporary Senior Project Officer at grade 11 for
an initial period of 1 year from the initial savings generated (£64,700) and the
balance from reserves (£11,300); and 
iii. to note that a further update on progress will be provided once the full
business case is developed.       
Page 14

Page 15

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 18 JUNE 2024 
SUBJECT: ECONOMY, ENVIRONMENT AND FINANCE (EEF) SERVICE
PLANS 2024-25 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To invite the Committee to consider the Economy, Environment and Finance
Service Plans for 2024-25, noting that the Service Plan for Financial Services
will be considered at Corporate Committee on 11 June 2024, the Housing and
Property Services Plan at the Housing and Community Safety Committee on
25 June 2024 and the Economic Growth and Development Services Plan will
also be considered at the Housing and Community Safety Committee on
25 June 2024 and Planning and Regulatory Services Committee on 13 August
2024 and each in terms of their respective remits. 
1.2 This report is submitted to Committee in terms of Section III (B) (50) of the
Council’s Administrative Scheme relating to ensuring that the organisation,
administrative and management processes of the Council are designed to
make the most effective contribution to achieving the Council’s objectives and
to keep these procedures under review. 
2. RECOMMENDATION 
2.1 In terms of the remit of this Committee, and subject to later scrutiny and
approval as set out in paragraph 1.1 above where required, it is
recommended that Committee consider and approve the Service Plans
for Economic Growth and Development, Housing and Property Services
and Environmental and Commercial Services. 
3. BACKGROUND 
3.1 Service planning is a key aspect of the Council’s Performance Management
Framework and is undertaken annually to set out the strategic direction for
services over the coming months. 
Item 5
Page 15

Page 16

3.2 It should be noted that actions from the Best Value Action Plan agreed by the
Corporate Committee on 23 April 2024 (item 5a of the Agenda refers) will be
monitored and reported out with the Service Plan process.   
3.3 The service planning process focuses on forward planning for medium-term
activities supporting delivery of the Local Outcomes Improvement Plan (LOIP)
and Corporate Plan.   The Council planning process also includes team plans
that focus on short term tactical and operational activities supporting delivery
of the service plan and strategies and Employee Review and Development
Plans (ERDP) provide individual planning for employees’ activities and
development. 
3.4 As well as identifying service developments and improvement, the Service
Plan Framework requires an assessment of the output and outcome
requirements for the services based on the Council’s priorities, statutory and
regulatory requirements and other relevant factors such as Public Sector
Improvement Framework (PSIF) or other equivalent service improvement tool
and matching of resources to these priorities.   Priority outcomes are those
included in the Council’s Corporate Plan that directly relate to the service or
are influenced by the service and should be clearly identified. 
3.5 Setting clear measurable outcomes and defining key indicators by which
progress will be assessed is a recognised area for development within the
Council and these Service Plans are part of the improvement journey to
implement the Performance Management Framework.   For some actions it
can be difficult to identify a measurable outcome (e.g. a change in legislation
that must be implemented or updating a policy framework).   It can also be
challenging where there is currently no clear baseline or benchmarking from
which informed targets and reasonable steps forward these can be
developed.   Therefore, as far as possible efforts have been made to set
measurable outcomes for service plan actions but in some cases outputs or
milestones have been used so that it is still possible to measure whether the
action has been progressed as intended.   In other areas, further work will be
required to refine outcomes in future.   So, for example, in some actions,
strategic and delivery planning is not yet concluded and so performance
indicators are not yet agreed.   Where possible in such cases milestones are
provided. 
3.6 A summary of progress is given below based on the annual reviews carried
out for each of the service areas and in so far as the activity is relevant for the
remit of this committee. Elements that are directly relevant for other
committee remits are shown in italics. 
3.7 Reference is also made to the report to Moray Council on 28 February 2024
when the Council agreed the Corporate Plan for 2024-2029 and that the
approach to delivery and performance management through service and
strategic plans, which contain specific actions that support the delivery of
priority areas in the new council corporate plan.  This plan focusses on the
period from April 2024 to April 2025.  
Page 16

Page 17

2023/24 Updates 
3.8 Economic Growth and Development 
3.8.1 Progress on planned work (success) 
• Public Bodies Climate Change Report approved
• Total £896K secured from external funds to improve town centres, £317K
of which target out with Elgin helping business start-ups, bringing
vacant/derelict property back into use, heritage programmes and
environmental improvements, plus funding for a Town Centre Officer post
• Full Business Case achieved for Moray Growth Deal Housing Mix delivery
• Achieved 84% on-target Route Map Net Zero actions
• Launched Moray Climate Action Network
• Forty-four staff and six elected members have been trained and gained
certification as Carbon Literate
• Planning Performance Framework achieved 14 green and 1 amber key
markers in feedback report from Scottish Government 
3.8.2 Progress on planned work (areas for development/not delivered) 
• Focus on engagement with schools to increase Route Map net Zero actions
on target 
3.8.3 Planned focus in new plan (reflecting above and challenges to come) 
• Implementation and conclusion of Moray Growth Deal Housing Mix delivery
phase
• Climate Change Plan and Routemap to Net Zero
• Community Safety Action Plan
• Proposals for Future Just Transition Bids
• Review of Developer Obligations
• Review of Planning Performance Framework 
• Prepare guidance document for Policy 11 c) in National Planning
Framework 4
• Community Wealth Building Strategy Action Plan 
3.9 Housing and Property Services 
3.9.1 Progress on planned work (success) 
• Smarter Working project rollout complete with fully operational hybrid
meeting rooms
• Repair feedback from handheld devices increased
• Reduction in complaints related to Repairs, Capital and Maintenance
• Revised Rent Setting Policy approved after extensive consultation with
tenants
• Delivery of revised Housing Need and Demand Assessment and
accreditation as ‘robust and credible’ by Scottish Government
Page 17

Page 18

• Significant improvement in the management of void properties, with
reduced turnaround time and loss of rental income
• Response to emergent issues with Reinforced Autoclaved Aerated
Concrete (RAAC), with assessments of corporate buildings and remedial
programme required for Forres Academy
• Assumed responsibility for Refugee Resettlement activities, significant
community work with asylum seekers and integrating Afghan and Ukrainian
households 
3.9.2 Progress on planned work (areas for development/not delivered) 
• Stores and depots review - OBC has been delayed due to capacity issues
but approved in April
• Improvement of housing stock, progress made and accelerated programme
developed for monitoring 
3.9.3 Planned focus in new plan (reflecting above and challenges to come) 
• Continued reduction in complaints related to repairs
• Tenant Survey undertaken for 2024
• Development of the Strategic Commissioning Plan with IJB
• Review of Gas Servicing ICT systems 
3.10 Environmental and Commercial Services 
3.10.1 Progress on planned work (success) 
• Planned increase in EV charging points and EV Strategy complete
• Successful migration to web-based system for Road Maintenance with
improved service efficiencies identified
• Joint Energy from Waste Project complete and site fully operational
• Active Travel projects delivered through Participatory Budgeting
• Core Paths Action Plan in place with recruitment of Core Path Ranger
complete
• Recycling rate of 57.79% confirmed with Moray ranked highest amongst all
Scottish Local Authorities
• Planned self-assessment work using the Public Service Improvement
Framework (PSIF) complete 
3.10.2 Progress on planned work (areas for development/not delivered) 
• Implementation of public use charging infrastructure remains ongoing with
funding to be confirmed for the Pathfinder project
• Work continues on the Road Safety Plan with a final version expected
quarter 1 2024/25
• Development of Buckie Harbour Masterplan remains ongoing due to
inclusion of Just Transition work 
Page 18

Page 19

3.10.3 Planned focus in new plan (reflecting above and challenges to come) 
• Continue to deliver on actions in line with Climate Change strategy
• Continue to engage with communities through Participatory Budgeting
• Deliver planned infrastructure projects linked to Moray West Wind Farm
and Buckie Harbour
• Key themes as follows:
o Decarbonise transport / develop sustainable travel
o Flood Risk Management
o Promote Buckie Harbour for growth and development
o Improve open space management
o Improve infrastructure asset management
o Procure efficient and effective school transport
o Deliver efficient waste and recycling management 
Service Plans for 2024/25 
3.11 Given the pressures across all services and the need to prioritise resources to
the Council’s priorities, services are focussing on essential service delivery
and developments and taking account of the planned review of the Corporate
Plan when undertaking service planning.   The three Service Plans are
attached to this report as follows: 
Appendix 1:  Economic Growth and Development 
Appendix 2:  Housing & Property 
Appendix 3:  Environmental and Commercial 
4. SUMMARY OF IMPLICATIONS 
a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP)
The Service Plans were informed by the LOIP and the Council’s Corporate
Plan. 
b) Policy and Legal
Statutory requirements and Council policies are considered by managers
when preparing service plans for the year ahead. 
c) Financial implications
No additional financial resources beyond those previously reported to
service committees are required to support the Service Plans. 
d) Risk Implications
Up to date risk registers are maintained and considered as part of the
service planning process. 
e) Staffing Implications
Service Plans are integral to good management practice including
workforce planning and assisting with communication about work plans for
staff, identifying priorities and matching staff time to the Council’s priorities.
Page 19

Page 20

However, there are a number of areas for development that have been
identified where there are concerns about the availability of resources to
deliver the required outcomes within an acceptable period of time.  It may
be necessary to report back to committee to consider resources or re-
prioritisation of work to ensure adequate progress on these key priorities. 
Workforce Planning takes place with service management teams and
includes review of workforce data such as turnover and absence,
identification of key posts for planning, recruitment issues and plans,
training and development requirements in the context of council and
service priorities.  It is also of note that the services are carefully
prioritising work to reflect the restricted capacity of their teams.  This is
exacerbated by hard to fill vacancies, absence, and pressing operational
work that cannot be re-prioritised. 
f) Property
There are no property implications arising from this report. 
g) Equalities
Managers consider equalities issues for staff and service users when
assessing current service delivery arrangements and future requirements. 
h) Climate Change and Biodiversity Impacts
There are no climate change and biodiversity impacts from this report. 
i) Consultations
Heads of Service have worked with their management teams to prepare
the Service Plans attached as Appendices 1-3 and have contributed to
the updates in this report. 
5. CONCLUSION 
5.1 The Service Plan has been prepared identifying the service priorities
targeted for 2024/25.  In preparing the plan, managers have taken
account of risk, performance data (including inspections and Best
Value), the LOIP, the Corporate Plan and other relevant factors such as
audit and inspection outcomes.  The Service Plan identifies the
resources allocated to each service and how these will be utilised to
deliver core service requirements and improvements. 
Author of Report:  Rhona Gunn, Beverly Smith, Edward Thomas, Nicola
Moss  
Background Papers: 
Ref: SPMAN-1108985784-929 / SPMAN-1108985784-943
SPMAN-1108985784-944 / SPMAN-1108985784-932 
Page 20

Page 21

ECONOMIC DEVELOPMENT & PLANNING SERVICE PLAN Appendix 1
SPMAN-433091491-114 
1. Service
Definition: 
Economic Growth and Development Service delivers key regulatory services associated with
Planning, Building Standards, Environmental Health and Trading Standards and leads on
Economic Development, Regeneration, Climate Change and Moray Growth Deal: - 
Environmental Health and Trading Standards deliver regulatory services for food safety, health and
safety, animal health, private water supply, public health, private water supplies, housing, landlord
registration, community safety, consumer advice, trading standards, safety of goods, petrol licensing,
illicit goods, consumer advice and tobacco sales. 
Development Management and Building Standards is responsible for planning and building standards
applications/warrants, compliance with planning conditions, enforcement of breaches of planning control
and dangerous buildings, both services aim to be self-financing attracting significant income through
statutory and discretionary fee income. 
Economic Growth and Regeneration delivers Business Gateway Service and Community Wealth
Building, external funding and manage allocations including UKSPF, town centre regeneration activities,
Business Improvement District, transfer of Museum service, skills and Employability. 
Strategic Planning and Development is responsible for the Local Development Plan/Supporting
guidance, preparation of masterplans, Climate Change/Routemap and Just Transition Conservation Area
and Grants, Town Centre regeneration Moray Growth Deal Housing Mix Delivery projects, Levelling up
Funding, Elgin Long Term Town Plan and Developer Obligations. 
2. Service
Resources:
96 FTE 
Annual Budget 2024/25: Net Revenue £3.8 million 
3. What have we identified for improvement in
2024/25
What evidence did we use to identify this improvement? 
Please add benchmark information wherever available and
relevant to the improvement.
Develop proposals for future Just Transition Bids Climate Change Strategy 2020-30
Prepare updated community safety response plan
incorporating recommendations from agreed Annual
Community Safety report.
Community Safety Strategic Group – Anti-social Behaviour Task Force
Item 5
Page 21

Page 22

ECONOMIC DEVELOPMENT & PLANNING SERVICE PLAN Appendix 1
SPMAN-433091491-114
Prepare guidance document for Policy 11 c) in National
Planning Framework 4 to maximise socioeconomic benefit
associated with energy developments and address
community wealth building.
National Planning Framework 4 
Review and prepare Planning Performance Framework (PPF)
to align with the template set out by the National Planning
Improvement Team
National Planning Improvement Framework 
Review of Developer Obligations Supplementary Guidance,
publish and consult on revised guidance including review of
methodologies.
National Planning Framework 4, Developer Obligations Supplementary
Guidance Moray Local Development Plan 2020 Guidance 
Note: Progress against BV Actions will be monitored and reporting out with Service Plan process 
4. Strategic
Outcome or
Priority
Action  Planned
Outcome
Outcome measures Completion
target
Lead Priority
Rating
(1 high
3 low
and 4
for
ongoing,
5 for on
hold)
(L) Developing a
diverse, inclusive &
sustainable
economy. (CP)
Building Stronger
Greener Vibrant
Economy
Progress Moray Growth
Deal: 
Bring the remaining
Moray Growth Deal
projects into delivery: 
By the end of the
Deal (2031):  MGD
outcomes relating
to GVA uplift,
tourism numbers,
affordable homes
built, job creation
and skills uplift to
be achieved.   
By the end of March
2025:  Ability to track
outputs and their impact
on outcomes through the
completion of a benefits
realisation and monitoring
plan.  
Bi-annual review of
project monitoring plans
at MGD Board meetings
(May and November).  
March 2026 
Interim target
of March
2025 for 7 of
the 8
projects to
be in delivery 
Head of
Economic
Growth &
Development
Services
1
Page 22

Page 23

ECONOMIC DEVELOPMENT & PLANNING SERVICE PLAN Appendix 1
SPMAN-433091491-114
(L) Developing a
diverse, inclusive &
sustainable
economy. (CP)
Building Stronger
Greener Vibrant
Economy
Delivery of the
Community Wealth
Building Strategy and
Action Plan 
Ensure wealth
stays within the
hands of our local
communities
Average gross weekly
earnings (full-time
employees) (SLAED)
March 2025 Head of
Economic
Growth &
Development
Services
1
(L) Developing a
diverse, inclusive &
sustainable
economy. (CP)
Building Stronger
Greener Vibrant
Economy
Enable more people to
work by supporting
access to affordable
childcare 
Minimise barriers to
people working
such as childcare 
Gender Pay Gap 
Number of Parents
assisted through
Employability partnership 
Number of Wrap around
places available
March 2025 Head of
Economic
Growth &
Development
Services
1
(L) Empowering &
connecting
communities. (CP)
Building Thriving,
Resilient,
Empowered
Communities
Delivery of the Levelling
Up 
Fund elements of the
Elgin City Centre
Masterplan 
Elgin City Centre is
a prosperous,
attractive and
health place
No of empty properties
and vacant/derelict sites
in the city centre 
No of additional
residential properties in
Elgin city centre
March 2026 Strategic
Planning and
Development
Manager
1
(L) Empowering &
connecting
communities. (CP)
Building Thriving,
Delivery of Town centre
Improvement Plan &
Annual Report 
Developing a
diverse, inclusive
and
Town Vacancy Rates
SLAED annual report
indicators – town centre
vacancy rates
March 2025 Strategic
Planning and
Development
Manager
1
Page 23

Page 24

ECONOMIC DEVELOPMENT & PLANNING SERVICE PLAN Appendix 1
SPMAN-433091491-114
Resilient,
Empowered
Communities
sustainable
economy: By the
year 2030
Moray will have a
sustainable and
inclusive economy
which generates
improved
opportunities for
everyone,
including more
skilled and higher
paid
jobs  
Page 24

Page 25

ECONOMIC DEVELOPMENT & PLANNING SERVICE PLAN Appendix 1
SPMAN-433091491-114 
5. Service Level
Outcomes or
Priorities
Action Planned
Outcome
Outcome
Measures
Completion
Target
Lead Priority
rating
Economic Growth &
Regeneration
Establishing Elgin Town
Board and supporting
engagement to prepare
Investment Plan for
submission to UK
Government
Elgin City is a
prosperous,
attractive and
healthy place
No of empty
properties and
vacant/derelict
sites in the city
centre 
No of additional
residential
properties in Elgin
city centre 
Crime statistics
August 2024 Strategic
Planning &
Development
Manager
1
Legislative/Regulatory Preparation and
submission of LDP
Evidence Report to
Gatecheck
Evidence to
support Proposed
Local Development
Plan to deliver
homes,
employment,
prosperity, town
centre
regeneration, active
travel, healthy
living,
infrastructure,
carbon reduction,
climate adaptation
and biodiversity
enhancement.
Outcome
measures to be
developed as part
of preparation of
LDP 2027
1 June 2024 for
submission of
Evidence
Report to
Gatecheck 
Timelines as
set out in
approved
Development
Plan Scheme
December
2023
Strategic
Planning and
Development
Manager
1
Page 25

Page 26

ECONOMIC DEVELOPMENT & PLANNING SERVICE PLAN Appendix 1
SPMAN-433091491-114
Climate Change and
Biodiversity Route
Map to Net Zero 
Building heat and
Electricity - Scoping and
research into increased
renewable energy
generation from Council
buildings and land. 
Achievement of
targets, indicators
and outcomes
identified in Climate
Change Action
Plan to achieve
Carbon Neutral by
2030.
LGBF, % RMNZ
amber/red Heat
and Electricity 
CO2 emissions
areas wide per
capita – (LGBF
CLIM1) 
CO2 emissions
within scope of LA
per capita –
(LGBF CLIM2)
March 2025 Principal
Climate
Change
Strategy
Officer 
1
Climate Change and
Biodiversity Route
Map to Net Zero 
Operating Emissions –
Governance & Climate
Change Awareness
Training (Re-branded) 
Adaptation
benchmarking 
Design and develop
online
Climate Change
awareness
Training 
Support the development
of
carbon knowledge and
skills to promote
innovation and effective
carbon management
Achievement of
targets, indicators
and outcomes
identified in Climate
Change Action
Plan to achieve
Carbon Neutral by
2030. 
LGBF
% RMNZ
amber/red
August 2025 for
all actions
Principal
Climate
Change
Strategy
Officer
1
Page 26

Page 27

ECONOMIC DEVELOPMENT & PLANNING SERVICE PLAN Appendix 1
SPMAN-433091491-114
Climate Change and
Biodiversity Route
Map to Net Zero 
Nature and Biodiversity 
Development of
Carbon Offsetting Plan
and
ensuring management of
council land holdings is
planned to maximise
carbon sequestration
Achievement of
targets, indicators
and outcomes
identified in Climate
Change Action
Plan to achieve
Carbon Neutral by
2030. 
LGBF
% RMNZ
amber/red
March 2025 Principal
Climate
Change
Strategy
Officer
1
Climate Change and
Biodiversity Route
Map to Net Zero 
Prepare Climate Change
Routemap 
Review 2030 net zero
target 
Update Climate Change
Strategy 
Consult, raise
awareness,
communicate and
engage
with staff, residents,
businesses an
organisation across
Moray about climate
change. Promote
relevant
campaigns. 
Join support networks to
assist the progress of
climate
change work
Achievement of
targets, indicators
and outcomes
identified in Climate
Change Action
Plan to achieve
Carbon Neutral by
2030. 
LGBF
% RMNZ
amber/red
August 2024 
January 2025 
June 2025 and
publish 2025 
March 2025 
March 2025 
Principal
Climate
Change
Strategy
Officer
1
Page 27

Page 28

ECONOMIC DEVELOPMENT & PLANNING SERVICE PLAN Appendix 1
SPMAN-433091491-114
Workforce Planning Identify route for
succession 
of professional officers
across the service 
Reduced risk of
statutory failures
impacting on public
health and safety
Number of
services at risk of
insufficient staffing
levels in
next 5 years to
deliver statutory
duties for
Environmental
Health, Trading
Standards &
Building
Standards
March 2025 Head of
Economic
Growth and
Development
1
Community Safety Prepare community
safety response plan
incorporating
recommendations from
agreed Annual
Community Safety report 
Reduce the number
of anti-social
behaviour referrals
Outcome
measures set out
in community
safety response
plan 
March 2025  Environmental
Health &
Trading
Standards
Manager 
1
Legislative/Regulatory Guidance for Policy 11c)
in NPF4 to maximise
socio-economic benefit
associated with energy
developments
Production of
guidance document
and associated
plans to maximise
economic impact
and address
community wealth
building
Ensure
compliance with
Policy 11 c) in
NPF4
Draft approved
April 2024,
consultation for
12 weeks to
commence by 1
August 2024
and final
document by
January 2025
Strategic
Planning &
Development
Manager
2
Legislative/Regulatory Review and prepare
Planning Performance
Framework (PPF)
Improved
performance in line
with pillars set out
in the template with
local case studies
PPF submitted to
National
Performance team
in line with agreed
deadline
December
2024
Development
Management
& Building
Standards
Manger
1
Page 28

Page 29

ECONOMIC DEVELOPMENT & PLANNING SERVICE PLAN Appendix 1
SPMAN-433091491-114
and performance
data
Legislative/Regulatory Review of Developer
Obligations
Supplementary
Guidance
Ensure Developer
Obligations
Guidance is robust
Collection and
spending of
Developer
Obligations
December
2025
Strategic
Planning &
Development
Manager
3
Develop proposals for
Just Transition Bids
Prepare a framework for
Just Transition Bids
Target investment
to create good,
green jobs through
the transition to net
zero
Framework for
bids prepared
March 2025 Strategic
Planning and
Development
Manager
2
Health & Wellbeing Ensure revised operational
implementation of absence
management procedures
are applied by managers
Absence is managed
effectively and levels
of absence are
reduced efficiently
and timeously
Reduction in
number of days
absence per
employee
March 2025 Head of
Economic
Growth &
Development
2
Page 29

Page 30

Page 30

Page 31

HOUSING AND PROPERTY SERVICE PLAN
SPMAN-1739018096-82 
1. Service
Definition: 
Management and maintenance of Council housing stock, local strategic housing function, statutory duties in
relation to homelessness and fuel poverty, development and delivery of the Moray Affordable Housing Supply
Programme (AHSP), maintenance of the Council’s corporate buildings, management of the Council’s
corporate property portfolio and the industrial estate, Building Service DLO, Property Design, Asset
Management and Estates function.
2. Service
Resources:
344 FTE employees 
Annual Budget 2024/25: £50.6m comprised of Housing Revenue Account (HRA) £26.2m, Building Services
£12.5m, General Services Housing & Property £11.9m 
3. What have we identified for improvement in
2024/25
What evidence did we use to identify this improvement? 
Please add benchmark information wherever available and relevant
to the improvement.
Systemic Review of Quality and Customer Service for
Housing Repairs
Informed by volume of tenant and elected member representations and
complaints. Comprehensive review of data including complaints to inform
a systemic action plan for improvement in terms of quality, value for
money and customer satisfaction 
Tenant Survey 2024
Survey is undertaken on a three-yearly basis and was included in
previous Best Value action plan – this will be undertaken by a specialist
market research consultancy
Review of gas servicing scheduling systems Existing ICT is unsupported.  Potential to replace it with a more robust,
supported and integrated system, which will schedule works and satisfy
statutory reporting requirements
Local Housing Strategy 2025-30 & HRA Business Plan
review Alignment with IJB with development of the Strategic Commissioning Plan
which must include a Housing Contribution Statement.  The statement will
be informed by the HNDA undertaken in 2023/24
Item 5
Page 31

Page 32

HOUSING AND PROPERTY SERVICE PLAN
SPMAN-1739018096-82
Improve attainment of EESSH (Energy Efficiency
Standard for Social Housing) and SHQS (Scottish
Housing Quality Standard)
Scottish Housing Regulator and benchmarking data – Moray Council is
below local authority averages 
Note: Progress against BV Actions will be monitored and reporting out with Service Plan process 
4. Strategic
Outcome or
Priority
Action  Planned Outcome Outcome
measures
Completion
target
Lead Priority
Rating
(1 high 3
low and 4
for
ongoing, 5
for on hold)
(L) Empowering
& connecting
communities.
(CP) Building
Thriving,
Resilient,
Empowered
Communities
Delivery of the Housing.
Investment and Affordable
Housing Supply
programmes 
Increase in affordable
housing available in
Moray 
No of new
supply social
housing for
rent: 
32 completions 
119 site starts   
31 March 2025 
31 March 2025 
Housing Strategy &
Development
Manager 
1
5. Service Level
Outcomes or
Priorities
Action Planned Outcome Outcome
Measures
Completion
Target
Lead Priorit
y
rating
Systemic Review of
Housing Repairs
Systemic Review of
Housing Repairs 
Increased customer
satisfaction 
Implementation of
improvement plan 
31 March 2025  Building Services
Manager
2
Page 32

Page 33

HOUSING AND PROPERTY SERVICE PLAN
SPMAN-1739018096-82   
Value for money
assurance
Digital self-service
tool available to
book repair
appointments 
Level of complaints
decreased by 10% 
Increase in number
of repairs
completed Right
First Time 
Response repair
expenditure
reduced by 10% 
31 March 2025 
31 March 2025 
31 March 2025 
31 March 2026 
Revise the Housing
Contribution
Statement with Health
& Social Care Moray
Assess and respond
to the housing needs
of older people, in
partnership with
IJB
Over a 3-year
programme an
average of 30%
of new affordable
homes at
accessible
standard are
delivered 
Achieve strategic
alignment of
allocations,
operations and
development
between the
31 March 2025 
31 December 2025
Housing Strategy
& Development
Manager
2
Page 33

Page 34

HOUSING AND PROPERTY SERVICE PLAN
SPMAN-1739018096-82
Council and IJB 
Continue to
reduce the
carbon impact
arising from
Housing & Property
Services
Phased
improvement of
energy efficiency
within corporate
buildings and
housing stock.
Carbon Neutral by
2030 
In relation to the
corporate estate a
reduction in
Scope 1 (direct
emissions arising
from energy
consumption
of 10% against
21/22
baseline of 5,615
tonnes of CO2 
% of houses which
meet EESSH
increased to be in
line with local
authority
benchmark of circa
90% 
2030 
31 March 2025 
31 March 2025
Property
Asset
Manager
2
HRA Business Plan
review
Undertake review of
financial position of the
HRA over the long
term
Assurance of sound
financial governance
for the long term 
Improved statutory
compliance 
Completion of
review
Milestones: 
Procurement of
consultancy
31 May 2024 
Completion
30 November 2024
Housing
Strategy &
Development
Manager
1
Page 34

Page 35

HOUSING AND PROPERTY SERVICE PLAN
SPMAN-1739018096-82
Tenants Survey
2024
Undertake a three-
yearly, large scale,
independent survey of
tenant satisfaction
Statutory compliance 
Assurance of good
quality service
delivery and tenant
satisfaction 
Opportunities to
direct investment
Increase
satisfaction with
property condition
for new tenants by
5% 
Achieve parity with
benchmarked
peers in relation to
overall tenant
satisfaction (83.4%
as of 2022/23) 
Milestones: 
Procurement of
consultancy
31 May 2024 
Completion
30 November 2024
Housing Strategy
& Development
Manager
1
Review of gas
servicing
scheduling systems
Review existing gas
servicing systems 
Complete option
appraisal for
improvements 
Provision of a robust,
supported and
integrated system,
which will schedule
works efficiently and
satisfy statutory
reporting
requirements
Statutory
compliance
Milestones: 
Complete option
appraisal
31 Oct 2024 
Agreed Action Plan
31 March 2025 
Building Services
Manager/ Housing
Strategy &
Development
Manager
2
Multiyear rent
increase strategy
Complete options
appraisal for future
rent increases, in
conjunction with HRA
Business Plan review
Assurance of sound
financial governance
for the long term 
Improved statutory
compliance
Approval of
multi- year rent
strategy 
Improve/maintain
tenant satisfaction
Milestones: 
Complete option
appraisal
30 Sep 2024 
Tenant consultation
15 Dec 2024 
Implementation
1 April 2025
Head of Service 2
Page 35

Page 36

HOUSING AND PROPERTY SERVICE PLAN
SPMAN-1739018096-82 
Review of
Housing &
Property teams
Identify opportunities
for efficiency across
teams, optimising
cost recovery and
incorporating
emergent work
within structures 
Efficiency of service
delivery 
£75k saving
Review of
interdependencie
s and changes to
be incorporated 
Consultation and
Approvals 
Implementation
31 October 2024 
31 January 2025 
31 March 2025 
Head of Housing
& Property
2
Health &
Wellbeing
Ensure revised
operational
implementation of
absence management
procedures are
applied by managers 
Absence is managed
effectively and levels
of absence are
reduced efficiently
and timeously
Reduction in
number of days
absence per
employee
March 2025 Head of Housing &
Property
2
Page 36

Page 37

ENVIRONMENTAL AND COMMERCIAL SERVICES SERVICE PLAN
SPMAN-487283337-213
APPENDIX 3
1. Service Definition:  Environmental and Commercial Services is a diverse service with twenty-one discrete functions delivered by four
services: - 
Roads Maintenance deliver management and maintenance of public roads, winter maintenance, street lighting, fleet services. 
Environmental Protection manage and maintain all parks, open spaces, core paths, countryside ranger service, amenity
areas and burial grounds waste/recycling collection, waste disposal, street cleaning, school meal service, building cleaning
and janitorial service for council buildings. 
Transportation has responsibility for the management of all traffic and road safety functions, street works co-ordination, active
and sustainable travel, transport planning and strategies, off street car parks, public transport unit PTU, and includes
maintenance and operation of 6 harbours including a dredger. Consultancy provides civil engineering construction related
services including bridge management, road design, contract management and flood risk.
2. Service Resources: Roads Maintenance 137FTE/ Environmental Protection 408.57FTE/Transportation 76.83FTE Consultancy 13FTE = Total
635.5 FTE 
Annual Budget 2023/24 Capital £16,859,000 Revenue £27,535,693 
3. What have we identified for improvement in 2024/25 What evidence did we use to identify this improvement? 
Please add benchmark information wherever available and relevant to the
improvement.
Decarbonise the council fleet  Corporate Plan 2024-29, Climate Change Strategy 2020-2030, Fleet EV Strategy
2024
Provide additional publicly accessible EV charging infrastructure Corporate Plan 2024-29, Climate Change Strategy 2020-2030, Electric Vehicle
Strategy 2023
Flood Risk Management  Statutory requirements on Surface Water Management Plans and Coastal
Adaptation
Further promote and develop sustainable travel  Active Travel Strategy 2022-2027, Climate Change Strategy 2020-2030, National
Transport Strategy 2
Promote Buckie Harbour for further growth and development Just Transition programme, Buckie Harbour Masterplan (draft)
Improve burials operations and infrastructure Cemetery capacity, complaints, service inefficiencies, opportunities from full cost
recovery policy position 
Item 5
Page 37

Page 38

ENVIRONMENTAL AND COMMERCIAL SERVICES SERVICE PLAN
SPMAN-487283337-213
4. Strategic Outcome or
Priority
Action  Planned Outcome Outcome
measures
Completion
target
Lead Priority
Rating
(1 high 3
low and 4
for
ongoing, 5
for on
hold)
(L) Developing a diverse,
inclusive & sustainable
economy. (CP) Building
Stronger Greener Vibrant
Economy
Progress the Bus Revolution
m:connect project as part of
the Moray Growth Deal   
Milestones: 
Q1/2 2024/25 – Charging
infrastructure locations agreed,
consultant appointed, group
booking function released and
vehicle orders for Phase 2
placed.  Committee reports on
new service route/Phase 1a
and Phase 2 service plan.
In line with corporate
plan outcomes of retain
and attract young
people, minimise
barriers to working,
adapt to changing
climate and acts
sustainably
Increase
public
transport
passenger
journeys on
m.connect by
4,286p.a. 
To reduce the
environmental
impact of
transport in the
area by 4.3t
CO2e p.a. 
Reduced
barriers to
employment
March 2025 
March 2025 
March 2025
(indicator in
development) 
September
2024 
HOS/Strategic
Transport
Services
Manager
4
Page 38

Page 39

ENVIRONMENTAL AND COMMERCIAL SERVICES SERVICE PLAN
SPMAN-487283337-213
Marketing campaign planning
to begin. 
Q2 2024/25 – DAR submitted
for staff increase.   
Q3 2024/25 – VMF submitted.
Marketing campaign approved
by board.  Charging units
commissioned 
Q1 2025/26 – Vehicles
delivered/in service and driver
training complete, service
registrations submitted and
listed, marketing campaign
launched, operational systems
deployed 
Q1 2025 Phase 2 launch date 
September
2024 
December
2024 
April 2025 
June 2025 
Note: Progress against BV Actions will be monitored and reporting out with Service Plan process 
5. Service Level
Outcomes or
Priorities
Action Planned
Outcome
Outcome
Measures
Completion
Target
Lead Priority
rating(1
high 3
low and
4 for
ongoing,
5 for on
hold)
Infrastructure
Delivery
Lead the transport element of the Town
Centre Improvement Plan
Developing a
diverse, inclusive
and
Transport
interventions on
track for delivery as
March 2025 Strategic
Transport
1
Page 39

Page 40

ENVIRONMENTAL AND COMMERCIAL SERVICES SERVICE PLAN
SPMAN-487283337-213
sustainable
economy: By the
year 2030
Moray will have a
sustainable and
inclusive
economy which
generates
improved
opportunities for
everyone,
including more
skilled and higher
paid
jobs
per programme (to
be confirmed when
final programme
agreed)
Services
Manager
Infrastructure
Delivery
Lead the infrastructure elements of the
Levelling Up Fund in line with Elgin City
Masterplan
Elgin City Centre
is a prosperous,
attractive and
healthy place
Number of
infrastructure
schemes on target
for planned delivery
(programme still
TBC – indicators to
be revised following
confirmation)
March 2026 Consultancy
Manager
1
Decarbonise
Transport &
Develop
Sustainable
Travel
Deliver Fleet EV Strategy Increased Electric
Vehicle provision
to meet Moray
Council Climate
Change targets
for 2040 - Moray
Council electric
fleet to increase
to 20% and
ensure suitable
EV charging
infrastructure in
place. 
No and % of small
electric vehicles
within the Council’s
fleet to increase in
line with Fleet EV
Strategy – 18
additional ZEV
introduced to fleet
in 24/25 
Increase the
current number of
Fleet EV charging
points by 20%.   
March 2025 Roads
Maintenance
Manager
2
Page 40

Page 41

ENVIRONMENTAL AND COMMERCIAL SERVICES SERVICE PLAN
SPMAN-487283337-213
Identify possible
renewable energy
source options for
Ashgrove depot
and develop
implementation
plan. 
Decarbonise
Transport &
Develop
Sustainable
Travel
Implement strategy for public use of on and
off street (car parks) charging infrastructure
via Pathfinder Project 
Milestone 1: Tender process to appoint
partner complete 
Milestone 2: Contract Award 
Milestone 3: Implement strategy
Community
Wealth Building,
Community
Benefits and
Economic Social
Governance
including training
and the
development of
local supply
chains for repairs
and servicing.  
Continue the
Pathfinder Project
with
Aberdeenshire,
Aberdeen City and
Highland Councils
to seek private
investment for the
expansion and
operation of the
publicly available
Electric Vehicle
Charging
Infrastructure in
Moray. 
December 2024   
April 2025 
March 2026
Strategic
Transport
Services
Manager
2
Decarbonise
Transport &
Develop
Sustainable
Travel
Delivery of Active Travel Strategy -
Promote and develop active and green
travel in schools 
Increased
awareness and
participation in
active and green
travel in schools
95% of all primary
schools will deliver
Level 2 Bikeability
by 2027 
60% of all journeys
to school to be
walked, wheeled or
cycled by 2027   
Milestone 1: 65%
of all schools will
have delivered L2
Bikeability 
Milestone 2: 52-
54% of all journeys
March 2027 
December 2024 
June 2025  
Strategic
Transport
Services
Manager
4
Page 41

Page 42

ENVIRONMENTAL AND COMMERCIAL SERVICES SERVICE PLAN
SPMAN-487283337-213
to school to be
walked, wheeled or
cycled 
Flood Risk
Management
We will develop Surface Water
Management Plans (SWMP) - Draft SWMP
for Forres and Findhorn by end 2024/25
Implementing
surface water
infrastructure
improvements in
vulnerable flood
risk areas: 
Reducing the risk
of surface water
flooding to
properties in
vulnerable areas
Draft SWMP for
Forres & Findhorn 
Implementing
surface water
infrastructure
improvements in
vulnerable flood
risk areas: (levels
of risk and areas to
be identified in
surface water
management
plans) 
New schemes
prioritised in Local
Flood Risk
Management Plans
for 2022 – 2028 will
reduce risk to
approximately 100
properties in
Moray)
March 2025 
Tbc following
completion of
plans
Consultancy
Manager
2
Flood Risk
Management
Deliver Coastal Adaption Plan  A plan to manage
Moray’s coastline
that is adaptable
to climate
change.
Supporting
management of
Moray’s Coastline
in a sustainable
way.
July 2024 Consultancy
Manager
2
Promote Buckie
Harbour for
further Growth
and Development
Publish Harbour Masterplan Promote
development
opportunities to
potential partners
and attract inward
investment
Publication of
Masterplan and
feasibility studies
September
2024
Strategic
Transport
Services
Manager
2
Page 42

Page 43

ENVIRONMENTAL AND COMMERCIAL SERVICES SERVICE PLAN
SPMAN-487283337-213
Improve Open
Space
Management
Create a burials administration service
which supports the needs of the burial
service and the requirements of the Burial
and Cremation (Scotland) Act
Improved service
delivery and
compliance with
regulatory
measures 
Meet the
requirements of the
Burial and
Cremation
(Scotland) Act 
Milestone 1:
Current service
health check and
knowledge based
documents
prepared by
Registrars 
Milestone 2:
Understanding
implications, once 
available, of the
Burial and
Cremation Act on
burial
administrative
functions 
Milestone 3:
Review and
recommend
appropriate system
for management of
burials   
March 2025 
July 2024 
September
2024 
November 2024
Environmental
Protection
Manager
2
Improve Open
Space
Management
Develop a Tree Strategy which will direct
how the Council manages its living assets
in Parks and Open Spaces.  Commence
risk-based tree condition surveys at
prioritised locations
Improved tree
management 
Improved health
and safety on
Council owned
Parks and Open
Spaces
At least two Parks
and Open Spaces
assessed per year
following budget
approval. 
March 2025 Environmental
Protection
Manager
2
Page 43

Page 44

ENVIRONMENTAL AND COMMERCIAL SERVICES SERVICE PLAN
SPMAN-487283337-213 
Costed process
for undertaking
tree/surveys
works which then
require budget
approval.
Improve Open
Space
Management
Creation of a new cemetery at Linkwood
Road, Elgin
Increasing the
vacant lair
capacity for future
use within Moray
cemeteries
Availability of
additional burial
capacity from 2026. 
Milestone 1:
Secure planning
permission for a
new cemetery 
Milestone 2:
Produce Tender for
the scope of works
needed to construct
a new cemetery 
Milestone 3:
Complete land
acquisition for the
land identified for
the new cemetery 
Milestone 4:
Appoint successful
to contractor to
construct the new
cemetery
March 2026 
July 2024 
July 204 
August 2024 
September
2024 
Environmental
Protection
Manager
1
Page 44

Page 45

ENVIRONMENTAL AND COMMERCIAL SERVICES SERVICE PLAN
SPMAN-487283337-213
Improve Open
Space
Management
Implement a rolling programme of
headstone inspections within cemeteries 
Improve the
health and safety
in cemetery sites
by inspecting
headstones and
carrying out
appropriate
remedial works   
Have a planned
long-term
programme for
managing safety
in cemeteries
Inspection and
make safe repairs
undertaken in at
least 2 cemeteries
per year
March 2025 
Ongoing after
2025
Environmental
Protection
Manager
2
Improve
Infrastructure
Asset
Management
Identify and collate all retaining walls. A full list of Moray
Council’s
retaining walls
with visual
inspection of
condition and
recommendations
for action
required
Asset management
Plan for Moray
Council’s retaining
walls
April 2026 Consultancy
Manager
2
Improve
Infrastructure
Asset
Management
Develop a prioritisation method for non-
network bridges.
Non-network
bridge
maintenance
prioritisation
methodology.
Non-network bridge
maintenance
prioritisation policy
December 2026 Consultancy
Manager
2
Improve
Infrastructure
Asset
Management
Improve the rate of Principal Inspections
undertaken on the Council's network
bridges by reassigning this work as a top
priority
Principal
Inspections rate
complies with
legislation (each
network bridge to
be inspected
every six years)
and Moray
improves the
inspection rate to
a similar standard
63 Principal
Inspections will be
undertaken each
year. Benchmarked
improvement in
bridge condition.
(Data is currently
gathered and
reported to SCOTS
Society of Chief
Officers of
December 2025
with progress to
be measured
annually.
Consultancy
Manager 
2
Page 45

Page 46

ENVIRONMENTAL AND COMMERCIAL SERVICES SERVICE PLAN
SPMAN-487283337-213
to other Local
Authorities
Transportation
Scotland and will
be added to
performance
reports when
available)
Efficient waste
and recycling
management
Plan the implementation of the deposit
return scheme as established by the
Scottish Government 
Ensure all
secondary
schools are
complying with
the deposit return
scheme
Funds secured for
procuring
equipment for roll
out of DRS 
Equipment ordered
in preparation for
implementation
phase. (currently
October 2025) 
March 2025 Service
Manager 
2
Efficient waste
and recycling
management
Compliance with the Waste Upholstered
Domestic Seating (WUDS) containing
Persistent Organic Pollutants (POPs)
Compliance with
the regulations
and SEPA
guidance with
regards POPs
Approval by SEPA
by meeting the
regulations and
guidance
March 2025 Service
Manager
2
Health and
Wellbeing
Ensure revised operational implementation
of absence management procedures are
applied by managers
Absence is
managed
effectively and
levels of absence
are reduced
efficiently and
timeously
Reduction in
number of days
absence per
employee
March 2025  HOS and
Service
Managers
2
Workforce
Development 
Undertake a staff led self- assessment of
our service activities and customer results
using the PSIF model (Public Service
Improvement Framework)
Results from self-
assessments will
be used to create
a targeted action
plan for long term
improvements to
the section 
Milestone 1:
Harbour PSIF
complete by TBC
Milestone 2: Action
plan complete by
TBC
March 2025 HOS and
Service
Managers
2
Page 46

Page 47

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 18 JUNE 2024 
SUBJECT: ENVIRONMENTAL AND COMMERCIAL SERVICES AND
ECONOMIC GROWTH AND DEVELOPMENT
SERVICES (ECONOMIC DEVELOPMENT) REVENUE AND
CAPITAL BUDGET MONITORING TO 31 MARCH 2024 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the current position regarding Environmental and
Commercial Services and Economic Growth and Development Services
(Economic Development) Revenue and Capital Budgets. 
1.2 This report is submitted to Committee in terms of Section III (A) (2) of the
Council’s Scheme of Administration relating to the consideration of Revenue
and Capital Budgets and long term financial plans. 
2. RECOMMENDATION 
2.1  It is recommended that Committee considers and notes the budget
monitoring report for the period to 31 March 2024 (QTR 4). 
3. BACKGROUND 
3.1 The Performance Management Framework 2020 (page 27) requires that
progress against Capital and Revenue Expenditure and the Capital Plan is
reported to the relevant Service Committee every Committee cycle. This
service committee level monitoring has not been undertaken for 9 months due
to a combination of staff absence and resourcing issues within services,
although corporate level monitoring of material variations has continued.
Improving financial reporting and forecasting is a key aspect of the Best Value
Action Plan and work is ongoing to improve consistency of approach in
financial monitoring across service committees and to clarify the interplay
between services and service accountancy support in preparing monitoring
reports for service committees. 
3.2 The information in this report was correct at the time of writing but may be
subject to minor amendments and variation as the year end figures are
Item 6
Page 47

Page 48

finalised. The final information is being prepared for the meeting of Full
Council on 26 June 2024. 
4. ENVIRONMENTAL AND COMMERCIAL SERVICES REVENUE BUDGET 
4.1 The revenue budget for 2023/24 was approved by Moray Council on 1 March
2023 (paragraph 5 of the minute refers). 
Annual Budget  Actual  Variance 
£30,017k £30,252k -£235k (0.78%) 
Environmental Protection 
Service Area Budget Actual Variance
Waste
Management
£8585k £8226k £359k
Open Spaces £1851k £1758k £93k
Building Cleaning
& Catering
£7643k £7467k £176k 
4.3 The key variances to the budgets within Environmental Protection are as
follows:  With regards Waste Management a number of budget lines were
underspent such as leachate extraction (£146k), ground water monitoring
(£21K), advertising (£20K) and waste deposition costs (£24K).  A number of
income lines over achieved the predicted budget, including the income from
gas extraction at Dallachy landfill (£24K), recycling materials (£29K), bulky
waste (£24K) and the sale of wheeled bins (£23K).   
A number of budget lines were overspent including £91K on internal fleet
charges, £61k under achievement in garden waste income (permit sales
numbers) and £82K in trade waste income.  Investigations are being
undertaken to understand the reason for the under achievement in trade
waste income and what can be done to address this.   
4.4 An additional £24K income in tipping charges at Dallachy and the
unanticipated income (£118K) from the use of Dallachy Landfill, as a
contingency facility for Energy from Waste, significantly contributed in
achieving an overall underspend in 2023/24. 
4.5 In relation to Building Cleaning and Catering the main contributing factor to
achieving an underspend was reduced food costs of £52K (due to withdrawal
from Food for Life) and increased income from food sales (£100k). This is
positive and reflects the good work done by the Catering Team to increase
uptake within secondary schools.  There was also of £34K underspend on
replacement equipment.  There was overspend with the budget lines relating
to increase in transport cost (£4K), due to in part to increased taxi charges for
transportation of meals from production kitchens to serveries, and a £12K
overspend on the HQ/Annexe tea service.  The possibility of a budget
pressure if sales did not reach pre covid levels was flagged when a decision
was made to reintroduce the service with a view to this covering costs. The
viability of tea service is currently being reviewed to determine the long term
future of this service. 
Page 48

Page 49

4.6 Although Open Spaces achieved an overall underspend of £93k, a number of
budget lines were overspent, as well as under spent. Under achievement in
income (£66k) from the sale of lairs was predicted, following cessation of pre-
purchasing of lairs.  Some of the underspends were due to the planned work
activities not being carried out due to resource pressures. Consequently, carry
forwards will be requested (£67k for Tree Inspections and £10k for headstone
inspections) to support service delivery in 2024/25.   
4.7 Other underspends in Open Spaces include a £39K Dornell contribution (Core
Path Ranger service) and £30K Rothes Way Grant.    These amounts will be
moved to earmarked reserves for use in 2024/25.  There was also a
combined underspend of £52K on tools, horticultural supplies and materials. 
There was an overspend of £56K in transport and plant costs (contributed
significantly by unavoidable vehicle hire charges following accident damage to
vehicles) and a £14K overspend in the maintenance of war memorials. 
Roads Maintenance 
Service Area Budget Actual Variance
Roads
Maintenance
£5,627k £6,187k £560k
Fleet Services  -£1,840k -£1,545k -£295k 
4.8 The overall overspend of £560k principally relates to a £569k overspend on
winter maintenance as the budget for winter maintenance is based on a mild
winter, and the costs for each year vary on the prevailing weather conditions.   
4.9 The general maintenance budget was underspent by £375k. There were other
overspends on energy costs (£22k), vehicle running costs (£278k), energy
costs (£22k) and software licenses (£19k).   
4.10 Insurance excess payments were £16k over budget and relate to claims.
Traffic signal maintenance was £20k over budget and reflects a growing
pressure on this budget with increased numbers of traffic signals to be
maintained. 
4.11 For Fleet Services, income was £461k greater than forecast due to increased
external hires which were recharged to other departments – with the cost
being reflected in the service user budgets. Energy costs were under budget
by £35k. There were however overspends relating to spares (£255k), running
costs (£40k), accident damage (£49k), external vehicle hires (£324k) and
supplies and services (£26k), which all reflect the challenging market
conditions and increased costs relating to outsourcing and workshop staff
shortages. 
Transportation 
Service Area Budget Actual Variance
Transportation £6,281k £6,633 £352k 
Page 49

Page 50

4.15 Public Transport Unit; Community Bus fund revenue income was underspent
by £8K due to the procurement process with the network review report coming
in under expected price. The Home to School transport budget was overspent
by 1.3% (£58k), largely on account of requiring an additional contract to
Lossiemouth High School due to pupil numbers, and unanticipated additional
support needs, pupil movements between various schools. m.connect was
over budget by £85k, principally relating the longstanding position where a
specific employer opportunity was forecast but not materialised. Work is
ongoing to address this shortfall before the next phase of the project is rolled
out. The Liftango app is under budget due to external funding covering costs. 
4.16 Traffic underspent £32k on road safety revenue, where work was impacted by
staff absences. The Development Plan work is underspent by £4k, however,
there is a request to carry this forward into 24/25 for conclusion of the traffic
modelling work. There was an income shortfall of £99k relating to reduction in
Roads Construction Consent inspections, due to long term sickness. EV
charging was overspent by £18k relating to energy price increases and issues
with non-payments, not being collected as debts, from current back-office
provider. EV Tariffs were increased in January 2024 to better reflect the
operational costs. The way the council and other neighbouring local
authorities run EV chargers is likely to change with the upcoming EV charger
tender and procurement process, so this is unlikely to be an issue in the
future. 
4.17 There was a £51k shortfall in car park income, this directly relates to transfer
of car park income across to beneficiary trusts, but reflects the longer-term
recovery from Covid in terms of overall town centre and seasonal use, with
the uplift in car park charges from January 2024 tracking as budgeted. 
4.18 Harbour Income is better than budget by £88k particular in relation to Pilotage
Fees and Cargo Movements. The dredger maintenance costs were £35k less
than budget. Staffing overspend of £26k relates to long-term sickness cover to
enable the harbour office to remain open 24 hours per day. The occupation of
Pier 3 by Ocean Winds commenced in July 2023, rather than April 2023 as
originally budgeted, meaning the full budget was not realised for the year in
this regard.   
Service Area Budget Actual Variance
Consultancy £983k £835k £148k 
4.20 There is no significant under or overspend on the Bridges Revenue budget. 
There was a small net overspend of £10k on the Flood Risk Management
Revenue Budget, which was due to the significant cost of clearing up after a
flood event at Aberlour. The bulk of the underspend relates to the SSEN grant
which will be spent during 24/25 principally on generators for resilience. There
has been a longer lead in time on these works than originally anticipated. 
This will be requested as a carry forward as it relates to ring-fenced grant
funding.
Page 50

Page 51

5. ENVIRONMENTAL AND COMMERCIAL SERVICES CAPITAL BUDGET 
5.1 The Capital Plan for 2023/24 was approved by a meeting of Moray Council on
1 March 2023 (paragraph 5 the minute refers).  The approved 2023/24 Capital
Plan for Environmental and Commercial services is £30,005,000. 
5.2 Facilities Management 
Budget: £15k, Actual; £2k, variance £13k.   
This budget relates to the provision and repairing of cleaning equipment in
support of the cleaning functions across the Councils estate, including
schools. Unfortunately there has been limited spend (£2K) on this budget in
2023/24 due to the post which uses this budget being vacant.  A new post
holder is now in place and it is anticipated that an increased number of
repairs/replacements will be experienced in 2024/25 following the inspection
process being restarted. 
5.3 Dallachy Landfill 
Budget: £468k, Actual £19k, variance £449k.   
This budget primarily relates to the capping of Dallachy Landfill site.  Dallachy
has been operational in 2023/24 and has been used as a short term
contingency site for the disposal of the Council’s mixed municipal waste when
the Energy from Waste Facility has been on shutdown. There has been
limited spend in 2023/24 (19K on the capital budget.  Due to ongoing use of
the site, it is anticipated that final capping will take place in 2024/25 so the
remaining budget of £449K will be requested as a  carry forward for 2024/25. 
5.4 Waste Management 
Budget: £143k; Actual: £128k; Variance: £15k.   
The budgeted spend relates to provision of domestic and trade waste bins,
replacement of containers at recycling centres and the provision of gull proof
bins. The trial of an alternative supplier for wheeled bins delivered an
underspend of £15k. 
5.5 Cemetery Infrastructure 
Budget: £2,280k; Actual: £151k, Variance: £2,116k.   
The bulk of this budget relates to the provision of the new cemetery at Elgin. 
There is a significant underspend on the budget but progress is being made. 
The legal negotiation on the land purchase have been more complex than
anticipated thus delaying progress. It is anticipated that the land acquisition
and build will commence in 2024/25 so the remaining £2,116K will be
requested to be carried forward into 2024/25. The budget area also includes
modest provision for planned and emerging infrastructure issues – primarily
safety related works at cemeteries.
Page 51

Page 52

5.6 Parks and Open Space Infrastructure 
Budget: £388K Actual: £285k, Variance £103k 
This budget includes the funding from the Scottish Government for the
renewal of play parks There was a committed underspend of £80K which is
requested to be carry forward into 2024/25 for upgrades to the play areas at
Netherha and Tomnavoulin (which were earmarked for upgrades in 2023/24). 
Typically, the upgrade to new play areas can take 18 months to complete due
to the need to undertake consultations as part of the participatory budget
process and lead times for procuring and installing equipment. There is also a
modest budget which is used to ensure any emerging infrastructure issues,
which present a health and safety concern, can be addressed.  The funds are
used to undertake both planned and emergency works.  The projects
identified for 2023/24 were concluded.. 
5.7 Roads Maintenance and Fleet 
Budget (Roads Maintenance) £5,648k  Actual: £5,234k; Variance: £414k
Budget (Fleet)  £5,798k  Actual: £4,807k; Variance £991k.   
Within the overall roads maintenance capital there was an overspend on
planned carriageway resurfacing and surface dressing works, because of  a
combination of inflationary increases on planned works, and also some
additional works that were added to the programme mid-year.  However, this
was offset by underspends in drainage, footways, kerb replacement and other
works which were underspent due to ongoing staff resource issues
The underspend in fleet replacement reflects the impact of resourcing issues,
and market conditions in terms of targeting best value purchases. 
5.8 Consultancy – Bridges and Flood Risk Management 
Budget (Bridges): £1,778k; Actual: £1,135k; Variance: £643k
Budget (FRM): £679k; Actual: £660k; Variance: £19k 
The majority of the capital programme for Flood Risk Management, which
consisted of significant maintenance to flood schemes, is complete.  Due to
adverse weather conditions some of the work to the Elgin Flood Scheme was
delayed and a carry forward of £130,000 will be requested to cover the cost of
the remaining work under this contract.  There is unplanned cost of £365k
relating to the compensation for Forres flood scheme which has now been
settled. Work to Viewmill Bridge did not begin until May 2024, due to delays in
completing the design, as such a carry forward of £270,000 will be requested
to construct these works.  The feasibility study for Arthurs Bridge was not
completed until May 2024, therefore a carry forward of £40,000 will be
requested to cover the cost of this work.  The Business Case for Cloddach
Bridge was completed with £120,000 funded by Heldon Community Council
and £67,000 funded by Moray Council.  The Business Case was submitted to
Department for Transport in April 2024.  Carry forward of £38,000 will be
requested for Lea Bridge in Forres, to allow for a structural assessment, this
work was delayed due to the need for site investigation works to inform the
Page 52

Page 53

assessment.  A £29,000 carry forward will be requested for Bridge of
Slateford, to undertake remedial works to repair erosion that occurred due to
very heavy rainfall immediately after construction. 
5.9 Transportation – Road Safety and Sustainable Travel 
Budget: £1,152k; Actual: £1,086k; Variance: £66k.   
Half of this budget relates to the Scottish Government Cycling Walking and
Safer Routes Grant, the remainder being road safety, traffic signs / markings
and monitoring equipment. There was a net underspend principally relating to
road safety and the CWSR grant. 
5.10 Transportation - Harbours 
Budget: £2,112k; Actual £2,416k, Variance £304k.   
This budget breaks down across dredging (including rock-cutting dredging
partially carried out in 23/24) expenditure of £866k, Substation Power
Upgrade expenditure of £723k, Harbour Infrastructure works of £662k, and
the Weighbridge replacement spend along with other subsidiary capital costs
of specialist advice and legal fees of £161k. Although there is a net overspend
of £304k there is also a contribution of £300k due relating to the substation
upgrade at Buckie harbour which will be received in 24/25. 
6.  ECONOMIC GROWTH AND DEVELOPMENT SERVICES (ECONOMIC
DEVELOPMENT) REVENUE BUDGET 
Element  Service Budget Actual Variance
PL540 Economic
Development
£1,216 £1,068 £148 
6.1 Business Gateway – the Business Gateway annual budget of £32k was
increased in 23/24 with £59k carried forward from the Economic Recovery
Fund.  This has resulted in underspend of £57k in 23/24 which can be
returned as a saving.  This is an exceptional one year underspend due to
increased budget.  The full Business Gateway Budget of £32k is required
annually to provide specialist services and workshops (already procured for
24/25). 
6.2 Growth Deal – £30k was available for specialist services related to the
development of the Moray Growth Deal. Services were to be procured for the
development of an economic benefit realisation plan however market
response was less than ideal requiring a second procurement and successful
appointed in early Q1 24/25. There will be a request for the full budget to be
carried forward to the next financial year.
Page 53

Page 54

6.3 Moray Gift Card (initiative started by Scotland Loves Local)_-£45K budget 
over 2 years returned from the Business Loan Scheme to continue
administration of the Moray Gift Card into 2023-2024 and 2024-2025 (£26k)
and to use the balance to develop further promotional incentives.  Funds can
only be spent as intended and must be carried forward until spent in full. 
Administration fee due November 24 and November 25. 
6.4 Maintenance of projects – £9k budget for match funding as required and
ongoing maintenance costs associated with projects including Castle to
Cathedral to Cashmere and Discover Moray’s Great Places. Actual was £1k
with £8k underspend in 23/24 due to limited project activity – will request to
carry forward underspend but no commitment yet.  Full £9k budget for 24/25
is already committed to activity in relation to Forres Town Centre
Improvement. 
6.5 Supplies and services - £12k budget for fees, charges and subs (SLAED,
HIREP, SDP) and general office costs etc.  Actual was £4k with £8k
underspend in 23/24 (Business Gateway funded SDP for one year only) – no
request to carry forward underspend.  It is anticipated that the full £12k budget
for 24/25 will be required. 
7. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan, (Local Outcomes Improvement
Plan (LOIP))
Effective budget management is an essential component of delivery of
Council priorities on a sustainable basis. 
The capital plan is one of the vehicles through which the Council’s
priorities can be delivered. The approved capital plan for 2024/25 and
the outline ten year plan incorporates measures designed to address
the LOIP priorities of building a better future for our children and young
people, empowering and connecting communities and developing a
diverse, inclusive and sustainable economy. 
(b)    Policy and Legal
There are no policy or legal implications arising directly from this report. 
(c)    Financial implications
The financial implications are highlighted within the report 
(d) Risk Implications
Budget managers are aware of their responsibilities for managing
budget allocations and approval for variance will be sought from
Committee in line with the Financial Regulations. 
(e)   Staffing Implications
There are no staffing implications arising from this report. 
(f)    Property
There are no Property implications arising from this report.
Page 54

Page 55

(g)    Equalities/Socio Economic Impact
There are no equalities implications arising from this report because
the report informs the Committee on budget monitoring.     
(h) Climate Change and Biodiversity Impacts 
There are no climate change or Biodiversity impacts arising from this
report. Achieving net zero will have significant implications for future
planned capital expenditure. 
(i) Consultations
This report has been prepared in consultation with Depute Chief
Executive (Economy, Environment & Finance), Head of Environmental
and Commercial Services, Head of Economic Growth and
Development Services, Chief Financial Officer, Legal Services
Manager, Committee Services Officer (L Rowan) and Environmental
and Commercial Services Management Team and Budget Managers. 
Any comments have been taken into consideration. 
8.   CONCLUSION 
8.1 This report sets out the budget monitoring position and comments on 
variances for the Environmental and Commercial Services and
Economic Growth and Development Services (Economic Development)
Capital and Revenue Budgets for the period to 31 March 2024. 
Author of Report: Nicola Moss, Head of Environmental and Commercial
Services & Beverly Smith, Acting Head of Economic
Growth & Development
Background Papers:  
Ref:   SPMAN-524642768-1101
Page 55

Page 56

Page 56

Page 57

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 18 JUNE 2024   
SUBJECT: PERFORMANCE REPORT (ECONOMIC GROWTH AND
DEVELOPMENT SERVICES) – PERIOD TO MARCH 2024 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the performance of the service for the period to 31
March 2024. 
1.2 This report is submitted to Council in terms of Section III (A) (4) of the
Council's Scheme of Administration to monitor performance of the services
within the Committee’s remit in accordance with the Council’s performance
management framework. 
2. RECOMMENDATION 
2.1 It is recommended that Committee: 
(i) scrutinises performance in the areas of Service Planning, Service
Performance and other related data to the end of March 2024; 
(ii) notes the actions being taken to improve performance where
required. 
3. BACKGROUND 
3.1 On 7 August 2019, the Moray Council, approved a revised Performance
Management Framework for services (para 5 of the minute refers).    
Item 7
Page 57

Page 58

4. SERVICE PLANNING 
4.1 Each service plan sets out the planned strategic and service level priorities
and outcomes it intends to deliver in the coming year aligning closely with
financial planning, corporate and community planning partnership strategic
priorities. This report provides an interim update on progress on the service
plan, key outcomes and performance indicators. The Committee is invited to
review progress to secure assurance that it is satisfactory and to provide
scrutiny and further direction where performance requires attention. 
4.2 The narrative included is by exception, links to Service Plan Actions and
Performance Indicators can be accessed within the Backing Papers of this
report. 
4.3 Latest Local Government Benchmarking Framework (LGBF) Indicators
covering 2022/23, initially published in February 2024, will be refreshed in
June.  The full suite can be viewed via the LGBF Dashboard.  In total, there
were thirteen indicators covering Economic Development published, six of the 
indicators were ranked highly  when compared nationally and eight indicators
ranked highly in the top 4 when compared in our family group of 8 local
authorities.  Overall, results improved to a slightly greater extent than they
worsened with results improving across seven indicators.  Published
indicators for this service have been incorporated within the relevant section
of this report depending on whether used to evidence progress against
strategic, service plan or service performance priorities.  2023/24 LGBF data
will be available early 2025. 
4.4 Scottish Local Authorities Development Group (SLAED) publish an annual
report under the SLAED Indicators Framework.  The report sets out a range of
data and information to assist local authorities to evidence and publicise the
contribution made through economic development activities, providing a basis
for collating consistent data used to better understand impact and identify
potential areas for improvement.  In previous years, these indicators have
been reported to this Committee separately report, however going forward
these will be incorporated within backing tables where they evidence progress
against strategic, service plan or service performance priorities, or otherwise
included as an additional table to report performance over time.  
Page 58

Page 59

SERVICE PLAN PRIORITIES RAG  
STRATEGIC
LEVEL
Moray Growth Deal:
Development and delivery of
Housing Mix Delivery Project
90%  
Moray Growth Deal: Cultural
Quarter Project 47%  
Climate Change and
Biodiversity Route Map 75% 
SERVICE
LEVEL
Identify route for training local
Environmental Health Officers
and associated budget needs
33%
Maximise external funding for
Council priorities including
Town Centre Improvement
works and employability.
70%
Town Centre Improvement
Delivery Plan and LDP 2027. 55%
External funding achieved for
delivery of strategic plans
associated with Town Centres
and LDP
75%
Service identifies and secures
future needs for succession
planning
50%
Service improves the ERDP
experience and holds accurate
records, including CPD.
75%    
OVERALL PLAN PROGRESS 64%       
Strategic Outcomes - successes 
4.5 The Public Sector Report on Compliance with Climate Change Duties 2022/23
was approved by this Committee on 14 November 2023 (para 10 of the
Minute refers) and submitted to the Scottish Government within the required
timescales. (ACTION: EGD24-4.2a) 
Strategic Outcomes – challenges and actions to support 
4.6 Planned work on actions contributing to the Delivery of Moray Growth Deal is 
progressing slightly out with original due dates.  Delivery of the Housing Mix
Delivery Project is nearing completion, the Full Business Case was agreed by
the Moray Growth Deal Board and progression of Phase 1 on Dallas Dhu and
Elgin site is well advanced with some good public engagement at an
exhibition in Forres Community Centre and another similar event planned for
builders and architects.  The Full Business Case for the Cultural Quarter is
anticipated by June 2024 to the Growth Deal Board and Full Council in August
2024, two months adrift of original target schedule, but not impacting on
overall project timescales. (ACTIONS: EGD24-4.1a & b)     
Page 59

Page 60

4.7  Although significant progress has been made in this reporting quarter against
the Climate Change and Biodiversity Route Map actions, for most work will
continue slightly past original due dates of March 2024.  A progress update
report on the Route Map to Net Zero is anticipated in the next reporting cycle. 
Online training on Climate Change awareness raising has been developed
and will require promotion going forward whilst supporting the development of
carbon knowledge and skills was subject to slippage due to competing
priorities, this action will carry forward to the 2024/25 Service Plan.  The draft
Local Heat and Energy Efficiency Strategy (LHEES) focussing on
decarbonising heat networks over the next 5 years was submitted to Council
on 24 April 2024 (item 4c of the Agenda refers) with publication date expected
in August 2024.  Moray Climate Action Network is fully operating and
collaborations continue as external influence in engagement and promotion of
Climate Change.  A report on the Natural Capital Enhancement Opportunities
was presented to the last meeting of this Committee (item 4d of the Agenda
refers) in developing a Carbon Offsetting Plan. (ACTIONS: EGD24-
4.2b,c,d,e,f,h,i,j,k INDICATORS: RMNZ-EGD1)   
4.8 LGBF in February 2024 published CO2 emissions indicator results for the
period 2021/22, although Moray is ranked in the third quartile for area-wide
greenhouse gas emissions it is in the lowest quartile for greenhouse gas
emissions within scope of the local authority. It is expected that recent
achievements in reducing carbon emissions from council buildings by 8% in
2023 will improve comparator rankings. (ACTIONS: EGD24-4.2,
INDICATORS: CLIM01, CLIM02) 
Service Level Outcomes – successes 
4.9 Nothing to report. 
Service Level Outcomes – challenges and actions to support 
4.10 Budget pressures have meant that just one of the proposed two trainee
Environmental Health Officers (EHO) posts can be filled.  Further budget
constraints have reduced capacity to supervise student EHO’s whose
complete training takes four years and work continues on ways to address this
issue. 
4.11 Planned work contributing to maximising external funding for Council priorities
has made good progress but will complete out with original target timescales. 
In 2023/24, the Lossie 2-3 Group transformed the ground floor of a derelict
theatre into a bright, spacious venue for childcare and community space. The
Moray Coast to Country project began in 2021 with the aim of improving
visitor experiences to rural areas in a low-carbon, sustainable manner. Moray
was successful in securing funding from the Rural Tourism Infrastructure Fund
to improve motorhome facilities, toilets and car parking in tourist hotspots. The
project has now reached its conclusion and the final report has been
submitted. (ACTIONS: EGD24-5.2 INDICATOR: SLAED-OC11)  
Page 60

Page 61

4.12 Progress in delivery of Town Centre Improvement Plans and Local
Development Plan 2027 (LDP2027) continues beyond original timescales.  An
evidence report for LDP2027 was presented to the meeting of Council on 24
April (item 4h of the Agenda refers).  Elgin Town Board has been established
and widespread engagement was launched inviting ideas around the Levelling
Up Fund award. (ACTIONS: EGD24-5.3a, 5.3b, INDICATORS: ECON09,
ECON10) 
5. SERVICE PERFORMANCE 
5.1  In line with the Performance Management Framework, operational
performance is reviewed quarterly by departmental management.  Areas
performing well and/or areas subject to a decreasing trend or where
benchmarking results show performance significantly below comparators will
be reported to this committee for member scrutiny.   
5.2 The narrative included in this report is by exception, links to Service
Performance Indicators can be accessed within the Background Papers at the
end of this report. 
Operational Indicators - successes 
5.3 Building Standards indictors continue to exceed target year on year, although
well within target, the data does show is an emerging trend of increasing
response times.  The service is aware and continues to monitor.
(INDICATORS: ENVDV-BS-KPO1(A), (B) and (C), ENVDV046a, 046b) 
Operational Indicators - challenges and actions to support 
5.4 The number of business gateway start-ups per 10,000 population fell from
12.4 to 11.1 in 2022/23 (ranked 27th of 32 authorities).  There were 107
businesses startups, below the target of 130, There remains uncertainty which
has increased the risk of starting a business, labour shortages and disrupted
supply chains have increase barriers for business start-ups.  It is unlikely that
performance will improve in the short term.  Moray Economic Strategy, Moray
Growth Deal and other programmes are intended to stimulate this area, but
any improvement will only become evident in the longer term.  Meantime, the
service continues to provide support and advice to local business through
Page 61

Page 62

events, workshops and seminars. (INDICATORS: ECON08, SLAED-A1, A2,
A3, OC9) 
5.5 Moray retains a higher proportion of properties without access to sufficient
broadband speeds (86%) than across Scotland as a whole (95.5%).  The
Scottish Government’s R100 programme is targeted to addressing this issue. 
However, despite the R100 North Lot contract being awarded to BT in
December 2020, there have been no properties served locally through the
rollout of the main contract, with many not scheduled to be served until 2028. 
Even then, several properties will remain without access to superfast
broadband as the cost of delivery is deemed too significant but will be eligible
to access support via the Scottish Broadband Voucher Scheme.  In Moray, a
new project has been funded via the UK Shared Prosperity Fund aimed at
increasing awareness and uptake of this scheme. (INDICATOR: ECON08) 
5.6 Vacancy rate of retail floor space has increased over the last three years to
12.65% as at March 2024, below target (10%). The biannual Town Centre
Heath Check reported the decline largely within Elgin and Forres.  The first
annual Town Centre Perception Survey was completed, and significant
engagements are ongoing to inform decisions around the Levelling Up Fund.
(INDICATORS: ENVDV250) 
6. OTHER PERFORMANCE RELATED DATA 
Complaints & MP/MSP Enquiries  
6.1  In line with the Performance Management Framework, complaints are
reviewed quarterly by departmental management in terms of time taken to
respond, outcome and learning points. Links to complaints tables can be
accessed within the Backing Papers of this report. 
6.2 A total of 15 complaints were closed in the half year to March 2024 of which 6
(40%) were frontline stage and 9 (60%) were investigative stage.  None were
upheld and 60% were closed within target timescales. 
6.3 In addition to complaints, a total of 34 MSP/MP complaints were received in
the last two quarters, all were resolved. Common issues were planning issues
and concerns around utility capacity. 
Other Performance (not included within Service Plan) 
6.4 Nothing to report. 
Case Studies 
6.5 Nothing to report. 
Consultation and Engagement 
6.6 Nothing to report.  
Page 62

Page 63

7. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Performance measurement is used to ensure the efficient and
sustainable delivery of services to meet the Council’s priorities in both
the Corporate Plan and the LOIP. 
(b) Policy and Legal
The Council has a statutory requirement to publish a range of
information that will demonstrate that it is securing best value and assist
in comparing performance both over time and between authorities where
appropriate. 
(c) Financial implications
None. 
(d) Risk Implications
None. 
(e) Staffing Implications
None 
(f) Property
None. 
(g) Equalities/Socio Economic Impact
An Equality Impact Assessment is not required as this report is to inform
the Committee on performance. 
(h) Consultations
The Head of Economic Growth & Development Services, Depute Chief
Executive (Economy, Environment & Finance) and Service Managers,
have been consulted with any comments received incorporated into this
report. 
8. CONCLUSION 
8.1 As of 31st March 2024 the service plan overall is 64% complete.  A number of
actions, subject to slight slippage in not meeting original due dates will
complete within the next reporting quarter. 
Author of Report: Christopher Dewhurst, Research & Information Officer
Background Papers: Service Plan Actions 
Service Plan Performance Indicators 
Service Performance Indicators 
Service Complaints
Ref: 
Page 63

Page 64

Page 64

Page 65

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 18 JUNE 2024 
SUBJECT: PERFORMANCE REPORT (ENVIRONMENTAL AND
COMMERCIAL SERVICES) – PERIOD TO MARCH 2024 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the performance of the service for the period to 31
March 2024. 
1.2 This report is submitted to Committee in terms of Section III (A) (4) of the
Council's Scheme of Administration to monitor performance in accordance
with the Council’s Performance Management Framework. 
2. RECOMMENDATION 
2.1  It is recommended that Committee: 
(i) scrutinises performance in the areas of Service Planning, Service
Performance and other related data to the end of March 2024;  
(ii) notes the actions being taken to improve performance where
required. 
3. BACKGROUND 
3.1 On 7 August 2019, the Moray Council approved a revised Performance
Management Framework for services (para 5 of the minute refers). 
4. SERVICE PLANNING 
4.1 Each service plan sets out the strategic and service level priorities and
outcomes it intends to deliver in the coming year aligning closely with financial
planning, corporate and community planning partnership strategic priorities. 
This report provides an interim update on progress on the service plan, key
outcomes and performance indicators.  Committee is invited to review
progress to secure assurance that is satisfactory and to provide scrutiny and
further direction where performance requires attention.   
Item 8
Page 65

Page 66

4.2 Latest Local Government Benchmarking Framework (LGBF) Indicators
covering 2022/23, initially published in February 2024, will be refreshed in
June.  The full suite can be viewed via the LGBF Dashboard.  In total, there
were fourteen indicators covering Environmental Services published, eleven
indicators ranked in the top 16 local authorities when compared nationally and
ten indicators ranked in the top 4 when compared in our family group of 8
local authorities.  Four indicators demonstrate that Moray in the top quartile
nationally for cost efficient service delivery (cost of parks/open spaces, cost of
waste collection, cost of street cleaning and cost of road maintenance).
Overall, results improved and worsened from previous year performance
equally across seven indicators each. Published indicators for this service
have been incorporated within the relevant section of this report depending on
whether used to evidence progress against strategic, service plan or service
performance priorities.  2023/24 LGBF data will be available early 2025. 
4.3 The narrative included is by exception.  Links to Service Plan Actions and
Performance Indicators can be accessed within the Background Papers
section of this report.   
Strategic Outcomes – successes 
4.4 Planned improvements in EV infrastructure is complete with 91 plug in
sockets now operational for council vehicles.  An update on the Zero
Emissions Fleet Replacement Strategy, including the options to ensure net
zero targets are met, was provided at the meeting of this committee on 30
April 2024 (item 13a of the agenda refers).  (Action ECS23-24 Section 4ai) 
Strategic Outcomes – challenges and actions to support 
4.5 At the end of 2023/24, 67 of the council’s 520 vehicles were electric (13%)
against a planned target of 15%.  As per the Zero Emissions Fleet
Replacement Strategy noted above in paragraph 4.4, work to decarbonise the
fleet will continue, although the scale of change is reliant on improved
infrastructure provision and availability of funding.  (Action ECS23-24 Section
4a ii)  
RAG
STRATEGIC
LEVEL Developing a diverse & sustainable economy 75%
Improving the Transportation Network 90%
Improving our operations 65%
Improved Service Delivery 100%
Harbour Development/Climate Change 88%
Environment/Climate Change 100%
Our Future Environment 100%
Improving our operations 100%
Delivering Capital Projects 80%
Workforce development 79%
78%
SERVICE PLAN OUTCOMES
OVERALL PLAN PROGRESS
Comment:   At the end of March, most actions within the
Environmental and Commercial Services Service Plan have been
delivered as planned.   For those out with target timescales, work will
continue in 2024/25.  
SERVICE
LEVEL
Page 66

Page 67

4.6 Work to identify private operators for publicly available charging points
through the Pathfinder Project continues.  Delays around funding led to
Tender documents not being issued in the Autumn as originally planned
however publication is expected shortly and a revised completion timescale of
December 2024 applied.  (Action ECS23-24 Section 4b) 
Service Level Outcomes – successes 
4.7  The agreement to outsource Principal Inspection work has assisted in clearing
the backlog and ensuring inspections have exceeded target.  Outsourcing will
continue in 2024, with a second contract recently awarded for a further 18
inspections.  (Action ECS23-24 Section 5b, PI ECSCON01) 
4.8 Migration of the asset management system to a web-based browser is
complete.  Although customer satisfaction levels are still to be confirmed
through APSE, service efficiency has been achieved with mobile devices
removing the need for approximately 9,000 paper orders per annum.  (Action
ECS23-24 Section 5c, PI ECSRM04) 
4.9  The Joint Energy from Waste project is complete with the acceptance
certificate issued in December and the site formally opened in April.  All non-
recyclable waste from Moray is now delivered to the facility with contingency
plans in place for Dallachy as per the commercial agreement.  Going forward,
the connection to the District Heat Network is expected in the next few months
and any snagging work at the site will be monitored by the technical
representative Ramboll.  (Action ECS23-24 Section 5e) 
4.10 Bikeability sessions have continued with 630 pupils involved across Moray. 
Other cycling activities this year included all ability and adapted sessions and
various instructor training courses.  Cycle parking and repair stations, linked to
the delivery of the Active Travel Strategy, have also been installed in both
Buckie and Keith.  Despite no increase this year in the number of schools
taking part in the Travel Tracker Programme, sustainable journeys to school
have continued to rise with 359,052 recorded this year, an increase of 13%
(40,706 journeys) compared to 2022/23.  (Action ECS23-24 Section 5gi and
5gii, PI ECSTTM05) 
4.11 Planned work to improve recycling performance and the school meal service
is complete for 2023/24 with both only slightly below annual targets.  The
percentage of recycled household waste improved to 57.8% (against a target
of 60%) ranking Moray as highest against all other local authorities.  Uptake of
free school meals in primaries 1-5 improved during the second half of the year
giving an annual rate of 76.22% (against a target of 78%).  Promotion and
awareness raising of both services will continue with improvements made as
required.  (Actions ECS23-24 Section 5i and 5j, PIs ENV6 and
ECSEPBCC02)  
Page 67

Page 68

Service Level Outcomes – challenges and actions to support 
4.12 Following approval of the draft Road Safety Plan at the meeting of this
committee on 14 November 2023 (para 6 of the Minute refers), further
consultation was undertaken during quarter 4.  Although out with original
target timescales, a final version of the Plan is included as an agenda item to
this meeting of Committee.  (Action ECS23-24 Section 5a) 
4.13 Development work at Buckie harbour continues with 80% of construction
complete at year end and delivery of a new harbour office expected
imminently but delayed due to issues with Openreach.  Recommendations
from a feasibility study linked to Just Transition work are to be included in the
Masterplan with consultation planned for early 2024/25.  (Actions ECS23-24
Section 5di and 5dii) 
4.14  ERDPs have been undertaken across all sections of Environmental and
Commercial Services involving approximately 663 members of staff (77%).
With ERDPs an annual process, plans are in place for the 2024/25 cycle. 
Following the successful completion of the Public Service Improvement
Framework (PSIF) self-assessment within Roads Maintenance, an
assessment of Open Spaces commenced however due to resourcing issues,
this exercise was paused.  This will now take place in 2024/25 alongside
assessments for Waste and Harbours.  (Action ECS23-24 Section 5l i) PI
ERDP.ECS3) 
5 SERVICE PERFORMANCE 
5.1 In line with Performance Management Framework, operational performance is
monitored quarterly by departmental management.  Areas performing well
and/or areas subject to a decreasing trend or where benchmarking results
show performance below comparators will be reported to this Committee for
member scrutiny. 
5.2 The narrative included is by exception, links to Service Performance
Indicators can be accessed within the Background Papers section of this
report.   
Page 68

Page 69

Operational Indicators – successes 
5.3 Average occupancy of paid car parks in Elgin fell during quarter 4 however the
annual rate has improved for the second consecutive year to 54% against a
target of 50%.  The Paybyphone app also continues to be popular, now
accounting for 38.6% of all payments; up from 29.2% in 2022/23.  (PIs
ECSTCP01, MPI ECSTCP04) 
Operational Indicators – challenges and actions to support 
5.4 Despite income from pay and display car parks being the highest in recent
years, net income fell below target (£586,000) to £387,589 with high capital
maintenance costs of £401,094 incurred due to planned resurfacing of
Batchen Lane Multi Storey car park.  (PI ECSTCP02) 
5.5 Due to slower, more targeted work and an increase in downtime due to
maintenance, total tonnage moved from internal harbours by the dredger has
declined this year.  As noted in the Marine Safety and Operational Summary
2023/24 reported to the 30 April 2024 meeting of this committee (item 13c of
the agenda refers), plans are in place to maximise crewed days and work
more effectively with maintenance to reduce the time the dredger is out of
action.  (PI ECSTHAR03) 
5.6 Net cost for commercial operations for all harbours significantly increased due
to high Capital Maintenance expenses.  Work undertaken included power and
weighbridge upgrade and north pier works at Buckie Harbour, quay repairs
and surveys at Cullen and Hopeman and works relating to a sink hole at
Findochty and the Groyne at Burghead.  (PI ECSTHAR02) 
5.7 Although there has been improvement, passenger costs relating to the
enhanced m.connect service continue to be above target.  Passenger growth
has surpassed original business case expectations and promotional
campaigns to continue this trend are ongoing.  Plans are also in place to
strengthen links with business and tourism partners following support of the
recent Spirit of Speyside Whisky Festival.  Public consultation and demand
analysis work to determine the next phase of the project are complete with
reports to this committee and Full Council expected in September.  With the
continued expansion of the service, the net costs target will also be reviewed. 
(PI ECSTPT01) 
5.8  For the second consecutive year, data relating to cycle journeys on the shared
use and national cycle network has been unreliable due to equipment failures
and battery issues.  Work is ongoing to rectify this for 2024/25.  (PI
ECSTTM18)  
Page 69

Page 70

6 OTHER PERFORMANCE RELATED DATA 
Complaints & MP/MSP Enquiries 
6.1 In line with the Performance Management Framework, complaints are
reviewed quarterly by departmental management in terms of time taken to
respond, outcome and learning points.  Detailed tables can be accessed
within the Background Papers section of this report.   
6.2 During the reporting period, Environmental and Commercial Services received
and closed 167 complaints, an increase on 22/23.  153 (92%) were closed as
frontline with 12 (7%) investigative and 2 (1%) escalated.  A total 138
complaints (83%) met the target timescale of either 5 or 20 working days.   
6.3 Overall, 69 complaints were upheld or partially upheld.  32 (46%) involved
Household Collections with missed bins due to crew error the most common
issue, an increase in volume on 22/23, but a consistent proportion of
complaints. Whilst crews have been reminded of the need to be vigilant and
ensure all bins meeting criteria for collection are emptied, the team are also
reviewing the missed bins policy to see if any improvements can be made. 
6.4 In addition to complaints, 74 MP/MSP enquiries were received during the
second half of 2023/24 with 16 relating to issues around Road Maintenance in
various areas of Moray. 
Other Performance (not included in the Service Plan) 
6.5 Nothing to report. 
Case Studies 
6.6 Nothing to report. 
Consultation and Engagement 
6.7 A series of public engagement sessions were held in March in relation to
Phase 2 of the m.connect expansion.  Building on the responses received to
the recent online survey, these sessions provided local communities with the
opportunity to discuss what can be improved and what they would like to see
from the service.  Feedback from these sessions will be incorporated into
reports noted in paragraph 5.7.   
7  SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Performance measurement is used to ensure the efficient and
sustainable delivery of services to meet the Council’s priorities in both
the Corporate Plan and the LOIP.  
Page 70

Page 71

(b) Policy and Legal
The Council has a statutory requirement to publish a range of
information that will demonstrate that it is securing best value and assist
in comparing performance both over time and between authorities where
appropriate. 
(c) Financial implications
None. 
(d) Risk Implications
None. 
(e) Staffing Implications
None. 
(f) Property
None. 
(g) Equalities/Socio Economic Impact
An Integrated Impact Assessment is not needed because the report is to
inform the Committee on performance. 
(h) Climate Change and Biodiversity Impacts
None 
(i) Consultations
Depute Chief Executive (Economy, Environment and Finance), The
Head of Environmental and Commercial Services, Service Managers,
Legal Services Manager, the Equal Opportunities Officer and Lissa
Rowan, Committee Services Officer have been consulted, with any
comments received incorporated into this report. 
8. CONCLUSIONS 
8.1 At the end of March 2024, the Environmental and Commercial Services
Service Plan is 78% complete with most actions delivered as planned. 
Work against those out with target timescales will continue in 2024/25.   
Author of Report: Suzanne Wilson, Research and Information Officer
Background Papers: Service Plan Actions 
Service Plan Performance Indicators
Service Performance Indicators
Complaints Monitoring Report 
Ref: SPMAN-524642768-1103 
Page 71

Page 72

Page 72

Page 73

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 18 JUNE 2024 
SUBJECT:  ROAD SAFETY PLAN TO 2030 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT
AND FINANCE) 
1. REASON FOR REPORT 
1.1 To seek Committee approval of the draft Moray Road Safety Plan to 2030
which has been subject to further stakeholder consultation, including with
Community Councils.   
1.2 This report is submitted to Committee in terms of Section III (F) (15) the
Council's Scheme of Administration relating to the duty of the Council as
Roads Authority. 
2. RECOMMENDATION 
It is recommended that Committee: 
i) notes the outcome of the stakeholder consultation and changes
made to the draft Road Safety Plan to 2030; and 
ii) approves the revised Road Safety Plan to 2030 attached as
APPENDIX 1.  
3. BACKGROUND 
3.1 The draft Road Safety Plan to 2030 was approved at a meeting of this
Committee on 14 November 2023 for an 8-week stakeholder consultation
(para 6 of the Minute refers). The draft Road Safety Plan to 2030 sets out
trends in reported accident and casualty data, along with the Council’s, and
other public services, approach to meeting the Scottish Government’s targets
set out in the Road Safety Framework to 2030 for reducing the number and
severity of reported injury accidents.  
Item 9
Page 73

Page 74

3.2 The draft Road Safety Plan highlights the following areas where actions could
be taken to work towards the target injury accident rates in the Roads 
Framework to 2030: 
• The prevalence of accidents on rural roads; 
• Ongoing maintenance of the road network;
• Driver behaviour and speed management;
• On-going education of road users; and 
• Provision of infrastructure for vulnerable road users (cyclists,
pedestrians etc. 
3.3 As part of the draft plan, it was proposed to introduce a Road Safety
Champions engagement group made up from members of Community
Councils. The group would become a focal point for engagement and
dissemination of road safety input and it is anticipated that officers from Police
Scotland will also be involved. 
Stakeholder Consultation 
3.4 The plan was sent out for stakeholder consultation and comments were
received from NHS Grampian, Health and Social Care Moray, Police
Scotland, Scottish Fire and Rescue Service, Amey (Transport Scotland’s
contractors for the trunk roads), Transport Scotland and other council services
and these have now been incorporated into the Plan. 
3.5 The main comments which resulted in changes, were in relation to the Fire
and Rescue service plan. A link is now included to this, along with an action
from them. Information from Health and Social Care Moray and their
promotion of active travel and ongoing healthcare recovery and a link to
Public Health Scotland have also been included. 
3.6 Over and above these there are minor changes to the Plan to reflect the
current situation and update the data to include the comparison to 2022
throughout Scotland. 
Joint Community Council – Road Safety Champions 
3.7 Officers gave a presentation about the Road Safety Champions proposal to
the Joint Community Council on 8 February 2024. The presentation was well
received, with attendees asking a number of questions regarding how the
group would operate. 
3.8 A follow up email was sent to all Community Councils setting out the terms of
reference for the group and seeking expressions of interest. 6 responses were
received from 5 Community Councils volunteering to be a member of the
group. 
3.9 It is proposed that the Road Safety Champion group will meet on a quarterly
basis, with the first meeting being face to face to provide some training on the
national and local approach to improving road safety, setting local speed limits
and cycle and pedestrian facilities. Road safety messages from national
Page 74

Page 75

campaigns would be shared with the Champions for dissemination through
their Community Council. There will also be the opportunity to discuss with
officers’ local road safety concerns and possible measures to address them. 
3.10 It is anticipated that the first meeting will take place in September 2024. 
Next Steps 
3.11 The final approved Plan will be published on the Council’s website and used
to support applications to the Scottish Government’s Road Safety
Improvement Fund. The plan will be subject to a mid-term review in 2027 to
assess progress against national targets and to see where joint working has
been successful/could be enhanced. 
3.12 Finally, the draft plan was the subject of an Integrated Impact Assessment
(APPENDIX 2). The minor amendments to the plan do not change the
outcomes of this previous Integrated Impact Assessment. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The key policy documents which are relevant to Road Safety are the
LOIP September 2021, the Moray Corporate Plan 2024 and the Moray
Economic Strategy. 
(b) Policy and Legal
Council has a duty under Section 39 of the Road Traffic Act 1988 to
prepare and carry out a programme of measures designed to promote
road safety. 
(c) Financial implications
There are no financial implications arising from this report. However,
revenue budgets for road maintenance, including surface dressing and
drainage maintenance and improvement as well as specific road safety
measures such as road markings, cats’ eyes and road signs have
reduced since approval of the last Road Safety Plan. The allocation of
revenue and capital budget is a matter for corporate prioritisation in the
budget setting process, and applications for external funding are made
wherever possible. 
(d) Risk Implications
There are no new risk implications arising from this report. 
(e) Staffing Implications
There are no staffing implications as this process forms part of existing
duties. However, any reduction in staff resources will have an impact on
the ability to deliver the plan.  
Page 75

Page 76

(f) Property
There are no property implications arising from this report. 
(g) Equalities/Socio Economic Impact
An Integrated Impact Assessment has been undertaken and no negative
impacts on any protected groups were found. An action in the Road
Safety Plan is to provide active travel infrastructure which would be
utilised by users with protected characteristics (Disability and Age). An
individual Equalities Impact Assessment will be undertaken as individual
schemes are developed to seek to maximise the benefits of each
scheme. 
(h) Climate Change and Biodiversity Impacts
An action in the Road Safety Plan is to provide active travel
infrastructure. Promoting Active Travel is one of the key actions in the
Council’s Climate Change Strategy. Provision of dedicated active travel
infrastructure can provide a positive impact on the climate through
enabling and encouraging alternative modes of travel through Moray.
Reduced emissions supports nature recovery and the overall
improvement of environments. 
(i) Consultations
Police Scotland, Scottish Fire and Rescue Services, Transport Scotland,
Amey Limited, North Safety Camera Unit, the Scottish Ambulance
Service, NHS Grampian, Moray Council Education and Environmental
Health officers have been consulted and their comments incorporated in
the plan. 
The Depute Chief Executive (Economy, Environment & Finance), Head
of Environmental and Commercial Services, Legal Services Manager,
Chief Financial Officer, Equalities Officer and L Rowan, Committee
Services Officer have been consulted and any comments taken into
consideration. 
5. CONCLUSION 
5.1 The draft Moray Road Safety Plan covers the period up to 2030, when it
is anticipated that the next Scottish Road Safety Framework to 2040 will
have been published. 
5.2 The draft plan takes into account the Safe System approach to Road
Safety which was introduced in the Scottish Road Safety Framework to
2030. The draft Plan also promotes joint working with neighbouring local
authorities and other public sector bodies. 
5.3 No significant changes have been made in relation to the stakeholder
consultations. 
Page 76

Page 77

5.4  A presentation was made to the Joint Community Council on the
proposed Road Safety Champion group. Community Councils have been
broadly supportive with 6 members from 5 Community Councils
volunteering to be part of the group. 
5.5 It is proposed to review the plan mid- term (2027) against the national
targets and to see where joint working has been successful/could be
enhanced. 
Author of Report: Elaine Penny, Engineer (Traffic)
Background Papers: Scotland’s Road Safety Framework to 2030 
Ref:    SPMAN-524642768-1064
Page 77

Page 78

Page 78

Page 79

NOTE: Awaiting Infographics and layout review. 
Moray Road Safety Plan
to 2030 
Item 9
Page 79

Page 80

Road Safety Plan to 2030 Appendix 1 
Table of Contents 
Executive Summary ......................................................................................... 1
Introduction ...................................................................................................... 5
Strategic Partnerships and Frameworks ....................................................... 8
Scotland’s Road Safety Framework .............................................................. 8
Local Partnership Forum North ................................................................... 10
Road Safety North East Scotland (RSNES) ................................................ 11
Local and Regional Policies and Context .................................................... 13
Accidents in Moray ........................................................................................ 15
Accidents and casualties ............................................................................ 15
Casualties in Built up versus Non-built up areas ......................................... 18
Casualties by home residence .................................................................... 21
Risk by road type ........................................................................................ 22
Casualties by road user type ...................................................................... 24
Age (Pre, young and older drivers) ............................................................. 24
The Cost of Accidents ................................................................................. 25
Issues and Actions ........................................................................................ 27
Issues ......................................................................................................... 28
Safe Road Use ........................................................................................... 28
Safe Vehicles .............................................................................................. 32
Safe Speeds ............................................................................................... 32
Safe Roads and Roadsides ........................................................................ 34
Post-Crash Response ................................................................................. 35
What we are going to do ................................................................................ 37
Future Targets ................................................................................................ 40
Glossary of Terms .......................................................................................... 41
Organisations Involved ................................................................................. 42 
Page 80

Page 81

Road Safety Plan to 2030 Appendix 1
Page 1 of 45
Executive Summary
This Moray Road Safety Plan covers the period up to 2030, when it is anticipated
that the next Scottish Road Safety Framework to 2040 will have been published.
The Plan takes into account the Safe System approach to Road Safety which
was introduced in the Scottish Road Safety Framework to 2030 (published in
2021).
Safe System/Vision Zero has a long-term goal for a road traffic system which is
eventually free from death and serious injury. It involves an important paradigm
shift from trying to prevent all collisions to preventing death and mitigating serious
injury in road traffic collisions, a problem which is largely preventable based on
current knowledge. 
Source: Loughborough University Design School Safe System Course, 2017, with PACTS
modifications, 2022 
Page 81

Page 82

Road Safety Plan to 2030 Appendix 1
Page 2 of 45
Available accident data up to 2023 has been reviewed and is presented in the
plan. The Scottish Road Safety Framework sets the baseline period which all
local authorities are required to use in their Road Safety Plans. Analysis of the
accident data shows that trends are downward with a 59% reduction in the
number of accidents between the baselines for the previous plan (2004-2008)
and this plan (2014-18), with a consequent reduction in the number of people
injured by 57%. The same figure for the whole of Scotland is 40%.
The biggest reduction is in slight injuries, which could be due to underreporting
as a result of changes to data collected after Police Scotland’s formation in April
2013. There is also, however, a 31% reduction in the number of people killed in
road accidents in Moray. This is likely due to several factors including better in
car safety, medical attention post-crash and engineering improvements to
prevent the accident happening in the first place. The incidence of serious injuries
has remained broadly similar. 
The previous 5 years figures (2018-22) have been significantly affected by
COVID19 travel restrictions with 2020 and 2021 recording the lowest ever
casualty figures across Scotland. In 2022, across Scotland, apart from fatalities,
the figures are still lower than they were prior to the pandemic 2023 figures are
still being analysed for Scotland. 
However, whilst the overall number of reported accidents is low compared to the
rest of Scotland, in Moray over 70% of casualties are injured on non-built up roads
(rural roads) compared to just a third of casualties for Scotland as a whole. It is
therefore important to consider the relative risk, rurality and specific
characteristics of injury accidents in Moray when developing interventions, as
opposed to following the Scotland wide approach.
There is no discernible pattern or clusters of reported accidents on the rural
roads. Therefore rather than focussing on specific engineering interventions at a
particular location, it is recommended to continue to view our rural routes as a
whole and look to ensuring that they remain fit for purpose with surfacing and
road markings in good condition, signage being clear and not obstructed by
vegetation and, where required, drainage interventions to reduce risks from
Page 82

Page 83

Road Safety Plan to 2030 Appendix 1
Page 3 of 45
surface water and icing. Accident records and complaints from the public will be
used to focus resources at locations or on routes where there is an increased risk
of accidents. Road condition surveys will be used to provide further evidence of
the need to prioritise a location/route.
Through this plan, the provision of dedicated active travel infrastructure to support
movements on the road network by vulnerable users will be pursued, to provide
an environment where users are more confident and therefore more likely to
travel by foot, wheeling or cycling. This infrastructure will focus on areas which
serve vulnerable users, e.g. young or older persons, and be delivered using
external funding sources and the Road Safety capital funding.
The Scottish Government Road Safety Framework encourages a partnership
approach with neighbouring authorities and other public sector bodies. Actions
within this Plan include joint working with the Education and Lifelong Learning
Service with respect to providing road safety education within the school setting
to children and pre and new drivers, along with joint working with Police Scotland
with respect to participating in ongoing campaigns and roadside education of
drivers, and the delivery of New Driver interventions.
An appropriate level of capital budget will also be required to implement
improvement schemes identified through the investigation of accidents which
occur during the lifetime of the plan. The types of improvement schemes could
relate to minor junction improvements, facilities to assist pedestrians and/or
cyclists crossing the road, the provision of improved sightlines at junctions,
improvement plans for routes and so forth. Applications will also be submitted to
the Scottish Government Road Safety Improvement Fund for schemes which
meet the fund criteria (mainly across the rural network).
The changes in travel behaviours during 2020 and 2021 as a result of the Covid
19 pandemic have led to significant reductions in the number of reported
accidents during those two years. It is therefore proposed to undertake a mid-
term review of the plan in 2027 to review Moray’s progress towards the national
interim targets for 2030 and to see where joint working has been successful/could
be enhanced.
Page 83

Page 84

Road Safety Plan to 2030 Appendix 1
Page 4 of 45 
Page 84

Page 85

Road Safety Plan to 2030 Appendix 1
Page 5 of 45
Introduction
This is the seventh Road Safety Plan for Moray, the previous plans being
prepared in 1997, 2000, 2004, 2007, 2011 and 2018, respectively. Each previous
plan laid out a framework of policies and actions to improve road safety over the
life of that plan. This plan seeks to review road safety activity in Moray and create
and maintain partnerships which will help develop proportionate interventions to
continue to improve road safety in Moray. It is also the first plan which will see
the focus on the safe system approach set out in Scotland’s Road Safety
Framework to 2030 ‘Together, making Scotland’s roads safer’.
The Plan is produced to meet the council’s statutory duty under Section 39 of the
Road Traffic Act 1988 to prepare and carry out a programme of measures
designed to promote road safety.
The Council is required to carry out studies into accidents arising out of the use
of vehicles on roads for which they are the Roads Authority and must, in light of
those studies, take such measures as appear to be appropriate to prevent such
accidents, including:
• the dissemination of information and advice relating to the use of roads,
the giving of practical training to road users or any class or description of
road users; 
• the construction, improvement, maintenance or repair of and other
measures taken in the exercise of their powers for controlling, protecting
or assisting the movement of traffic on roads; and 
• in constructing new roads, must take such measures as appear to be
appropriate to reduce the possibilities of such accidents when the roads
come into use.
Road Safety sits within a wider context of policies and activities undertaken by
local authorities and public bodies, as shown in the diagram below:
Page 85

Page 86

Road Safety Plan to 2030 Appendix 1
Page 6 of 45 
Source: Scotland’s Road Safety Framework to 2030
The new Road Safety Framework promotes partnership working ‘Together,
making Scotland’s roads safer’. However, it is also the responsibility of road users
to ensure that their vehicles are road worthy, they have a valid licence for the
type of vehicle they are using and that they are fit and competent to safely operate
a vehicle. 
There are strong interrelationship between the various groups and bodies with
respect to Road Safety as demonstrated in the following diagram: 
Page 86

Page 87

Road Safety Plan to 2030 Appendix 1
Page 7 of 45 
Although there are these relationships, each body has its own clear area of
responsibility.
Whilst the Trunk roads throughout Moray are the responsibility of Transport
Scotland, and are managed and maintained on their behalf by Amey, all the
statistics quoted in this plan are for both trunk and local roads. This goes back to
the council responsibility for road safety on all the roads within its area. 
This Plan has been produced by the Moray Council’s Transportation team in
conjunction with local representatives of Police Scotland; Transport Scotland
Amey; NHS Grampian; Scottish Fire and Rescue Service; The Scottish
Ambulance Service, North East Safety Camera Unit and other Council services,
such as Education and Lifelong Learning and Moray Health and Social Care
Partnership. 
Page 87

Page 88

Road Safety Plan to 2030 Appendix 1
Page 8 of 45
Strategic Partnerships and Frameworks
Scotland’s Road Safety Framework
Scotland’s Road Safety Framework to 2030 - Together, making Scotland's roads
safer, was published by Transport Scotland in February 20211. It heralds a new
approach to road safety by introducing the Safe System approach at a national,
regional, local and even individual level. The following diagram sets out the five
pillars of the Safe System:   
1 Scotland's Road Safety Framework to 2030
Page 88

Page 89

Road Safety Plan to 2030 Appendix 1
Page 9 of 45
The Framework also proposes new targets.2 to 2030. These interim targets are
‘milestones’ or ‘check points’ for the Framework’s long term goal of moving close
to zero fatalities and serious injuries in road transport by 2050.
It should be noted that within the Framework the baseline for accident data used
to assess progress towards the above interim targets has been set as the years 
2 Scotland's Road Safety Framework to 2030
Scotland’s Road Safety Framework Targets
Our Targets
Interim Targets to 2030
50% reduction in people killed
50% reduction in people seriously injured
60% reduction in children (aged <16) killed
60% reduction in children (aged <16) seriously injured 
Intermediate Outcome Targets
• 40% reduction in pedestrians killed or seriously injured
• 20% reduction in cyclists killed or seriously injured
• 30% reduction in motorcyclists killed or seriously injured
• 20% reduction in road users aged 70 and over killed or
seriously injured
• 70% reduction in road users aged between 17 to 25 killed or
seriously injured
• Percentage of motorists driving/riding within the posted speed
limit
• The casualty rate for the most deprived 10% SIMD areas is
reduced to equal to the least deprived 10% SIMD areas.
Intermediate Measures
• Casualty rate per 100 million vehicle kilometres for cyclists
killed and seriously injured
• Casualty rate per thousand population for pedestrians killed
and seriously injured
• Number of people killed and seriously injured in collisions
where at least one driver/rider was driving for work, not
commuting
Page 89

Page 90

Road Safety Plan to 2030 Appendix 1
Page 10 of 45
2014 to 2018. The previous baseline for the Scottish Government Road Safety
Framework to 2020 covered the years 2004 to 2008.  
The baseline figures for Moray are
Child 2014-18 numbers
Adults killed 20
Children killed 3
Adults seriously injured (adjusted) 215
Children seriously injured (adjusted) 20
Adults Slightly injured (adjusted) 211
Children Slightly injured (adjusted) 22 
This translates into our targets to 2030  per annum being:
50% reduction in people killed = 2.3
50% reduction in people seriously injured = 23.5
60% reduction in children (aged <16) killed = 0.2
60% reduction in children (aged <16) seriously injured = 1.6 
These numbers are incredibly low and one accident can affect whether they are
achieved, which is why the Scottish Government asks each area to contribute to
the overall target, rather than set their own individually. 
Local Partnership Forum North 
In a wider context, and to improve communications between national and local
level government, Transport Scotland’s Road Safety Framework has developed
three Scottish local partnership forum groups. The North Unit comprises the
Councils of:
• Aberdeenshire
• Aberdeen
• Angus
• Perth & Kinross
Page 90

Page 91

Road Safety Plan to 2030 Appendix 1
Page 11 of 45
• Moray
• Highland
• Comhairle nan Eilean Siar
• Shetland Islands,
• Orkney Islands.
These forums allow operational partners to discuss specific interventions and
compare the types of road users who are injured. It is important that these links
are developed as approximately a third of all Moray residents injured each year
in road accidents happen on trunk roads. This pattern is similar across the
neighbouring local authorities, who are also part of the Local Partnership Forum
North and the Road Safety North East Scotland groups.
Road Safety North East Scotland (RSNES)
Across the north east of Scotland, agencies have been working in partnership
since Local Government reorganisation in 1996 to reduce the number and
severity of casualties on our road network. This culminated in a Joint Public
Sector Group formalising a partnership which is now known as Road Safety North
East Scotland (RSNES). From the peak road casualty figures in 2004-2006 the
group has steadily reduced the number and severity of casualties in the
intervening years. The latest strategy for the RSNES was approved in summer
20173
The group comprises partners including the three north east local authorities;
(Aberdeen City, Aberdeenshire and Moray Councils), NESTRANS, North Safety
Camera Unit. NHS Grampian, Police Scotland, Road Safety Scotland, Scottish
Fire and Rescue Service and Transport Scotland, all of which have a role in road
safety.
The group monitors ongoing accident and casualty trends and collaborates on
campaigns and research. Robert Gordon University are currently working on a 
3 North East Scotland Road Casualty Reduction Strategy 2017
Page 91

Page 92

Road Safety Plan to 2030 Appendix 1
Page 12 of 45
number of research projects on behalf of the RSNES in relation to young driver
interventions, motorcycle crashes4 and interventions5 and the general downward
trend of casualties across the North East compared to Scotland as a whole. 
Prior to 2020, Aberdeenshire Community Safety Partnership alongside RSNES
delivered the young driver intervention ‘Safe Drive, Stay Alive’. However, in 2018
Transport Scotland commissioned a research report from TRL (Transport
Research Laboratory) which reviewed the effectiveness of pre–driver
interventions. The report6 was critical of the type of Safe Drive interventions as
there was little evidence that the main premise of any intervention should be ‘do
no harm’ was fulfilled. 
With this in mind, Police Scotland in Ayrshire developed a new type of young
driver intervention, ‘New Driver Scheme’, which was evaluated by Research
Scotland. The new intervention was more targeted and delivered face to face with
an experienced police officer. This has now been rolled out across Scotland and
was introduced in the North East in 20227. 
The RSNES group also shares successes in engineering interventions and best
practice. 
4 Motorcycle Safety Strategies in North East Scotland. Caroline Hood RGU
5 Rider Refinement North 2022:independent evaluation report, Caroline Hood RGU
6 Review and assessment of pre-driver, TRL, PPR838
7 New Driver Scheme launch
Page 92

Page 93

Road Safety Plan to 2030 Appendix 1
Page 13 of 45
Local and Regional Policies and Context
At a local level, the key policy documents relevant to road safety are: 
• The Local Outcome Improvement Plan V2 (Moray Community Planning
Partnership) September 2021
• Moray Corporate Plan 2024 (Moray Council)
• The Moray Economic Strategy (Moray Council) 
This plan is consistent with the priorities of the Moray 10 year Plan – the Council’s
Local Outcome Improvement Plan V28 through:
• Building a better future for our children and young people in Moray by:
promoting and supporting safer environments and communities; and
• Empowering and connecting communities through the Moray Economic
Strategy 20229 by: supporting productivity growth through enhancing critical
infrastructure. 
The Council’s Corporate Plan for 202410 also indicates that it ‘will continue to
provide services which support economic growth and well-being, such as …,
maintaining an efficient road network …. These activities directly support national
objectives.’
In terms of regional policy, Moray is part of HiTrans Regional Transport
Partnership area. This Plan is consistent with the aims and objectives of the
HiTrans Regional Transport Strategy11 draft May 2017 (an updated strategy is
expected), and the second Moray Local Transport Strategy12 which states at Sub-
Objective S2 that we will: 
8 Local Outcome Improvement Plan V2, Moray Community Planning Partnership
9 Moray Economic Strategy 2022
10 Corporate Plan 2024
11 HiTrans Regional Transport Strategy 
12 Moray Local Transport Strategy
Page 93

Page 94

Road Safety Plan to 2030 Appendix 1
Page 14 of 45
Develop solutions to traffic safety and capacity problems within
Moray and work with the Scottish Government, developers and
others to minimise predicted problems.
The speed of traffic through built up areas is a concern raised by many
communities in Moray. However, it is on the rural roads outwith built up areas
where speed tends to be a factor in road accidents. Enforcement of traffic speeds
is carried out by Police Scotland and their Moray Local Policing Plan13 supports
the aims of this document through Operation CEDAR. 
Operation CEDaR (Challenge, Educate, Detect and Reduce) is the north road
safety strategy aimed at casualty reduction and improving safety on the roads
within the Police Scotland North Command area (which Moray and North East
local command areas fall under). Operation CEDaR is delivered through local
initiatives which are specifically aligned to the issues identified in each Police
Scotland Division. Where appropriate these initiatives will involve local policing
teams and partner agencies to reduce the number of people killed and seriously
injured in the area and improve the behaviour of drivers of all ages behind the
wheel. Locally Police Scotland partner with DVSA, DVLA and NESCAMP as well
as schools on occasion. 
13 Moray Local Policing Plan 2023-2026
Page 94

Page 95

Road Safety Plan to 2030 Appendix 1
Page 15 of 45
Accidents in Moray
It is important that any actions arising from this plan are designed to address
issues identified through the consideration of recorded accident data. The
following section analyses the recorded accident data provided to Moray Council
by Police Scotland, seeks to understand the data and identify patterns and trends.
Accidents and casualties
Police Scotland collect information on all accidents reported to them, either at the
scene of an injury accident or reported by a member of the public after the event.
This information is then analysed by both police officers and roads engineers to
determine locations on the road network which show clusters of accidents;
different types of accidents and groups of road users who may be particularly at
risk.
The number of accidents and casualties vary quite considerably from year to year
as a result of weather and other external factors which can affect the number and
type of journeys made. This can affect the reliability of any conclusions drawn on
one particular year’s data. This is especially true in areas which are largely rural
and dependent on local conditions, as opposed to large urban areas where
journey patterns are fairly stable.
Analysis of accident data is usually carried out over a three or five-year period. 
The following graph (on page 17) shows the trends in reported accidents in Moray
over the period 2004 to 2023. There are several points on the graph where there
is a significant increase or decline in the number of reported accidents. These
points have been highlighted and reasons for the anomalies/change given on the
graph.
Additionally, from July 2019 Police Scotland introduced a nationwide accident
and casualty data recording system called CRaSH (Collision Reporting and
Sharing). The way serious casualties are now being recorded is based on specific
injury types and the system then categorised the casualty by killed, seriously or
slightly injured. Before this system was introduced, the classification of the injury
was assessed by the attending police officer. The same system has been
Page 95

Page 96

Road Safety Plan to 2030 Appendix 1
Page 16 of 45
gradually rolled out across Great Britain and the effect has been that some
casualties previously categorised as slight were now being recorded as serious,
leading to an overall increase in the serious injury numbers. The Department for
Transport has subsequently adjusted the originally recorded figures and these
are the ones being used to measure the future targets against. The graph shows
the adjusted trend lines for serious and slight casualties. The 2020 - 23 numbers
are not adjusted as the new system was in place during that period. 
The adjusted trend lines follow the same pattern as that originally recorded, but
are higher for serious casualties and lower for slightly injured. The reduction in
Killed and Seriously injured casualties (KSI) between the two baselines in
Moray is around 9% with the recorded figures. For Scotland this figure is around
37%. The adjustments haven’t been made before 2006, so the adjusted base
for 2004-08 is not available to calculate the reduction. For all casualties in
Moray the reduction is around 57% which compares with around 40% for all
Scotland. 
The Moray data is a very small sample size and is prone to fluctuation. This can
explain some of the variation between Moray and the whole of Scotland. The
following sections seeks to explain this in more detail. 
Page 96

Page 97

Road Safety Plan to 2030 Appendix 1
Page 17 of 45 
Page 97

Page 98

Road Safety Plan to 2030 Appendix 1
Page 18 of 45
All data in this plan is quoted for a 5 year period 2018-2022 to allow comparison
of 5 year data with national information in Reported Road Casualties Scotland.14
Full 2023 data is likely to be published in October 2024, although interim data is
usually available in May each year. The COVID19 pandemic has skewed these
figures due to restrictions on travel and movement during both 2020 and 2021.
Future years’ figures will be more representative when compared to the baseline
of 2014 to 2018 (set in the Road Safety Framework to 2030), although it should
be noted that overall travel patterns are changing with the move to more hybrid
working and online shopping. Scottish Government are also seeking to reduce
car-kilometres by 20% by 2030. Measures to support that aim will be likely to
have a further impact on travel behaviours. Therefore, travel patterns may never
wholly revert to travel patterns observed prior to the pandemic.
Casualties in Built up versus Non-built up areas
Built up roads are defined as those having a 40mph speed limit or less and non-
built up are national speed limit or 50mph speed limit. The pattern of where
casualties are injured on the road network is very different in Moray when
compared to Scotland as a whole. Between 2014 and 2018 (Road Safety
Framework to 2030 baseline) over 70% of Moray casualties were injured in
accidents happening on rural roads, compared to just a third of casualties for
Scotland as a whole, as illustrated in the diagrams below: 
14 Reported Road Casualties Scotland
Page 98

Page 99

Road Safety Plan to 2030 Appendix 1
Page 19 of 45 
15 
15 MAST Online Road Safety Analysis
Page 99

Page 100

Road Safety Plan to 2030 Appendix 1
Page 20 of 45
As the data for Scotland as a whole shows higher accident rates in built up areas
than on rural roads, Scottish Government has developed a National Strategy for
20mph, which would see the current limit of 30mph on most urban roads, being
reduced to 20mph as standard to support reduction in the number and severity
of accidents in built up areas.. 
Research carried out in the 80s, 90s and 00s identified fatality risk for pedestrians
being struck by passenger vehicles travelling at certain speeds.16 Results varied
markedly but the general conclusion was that there is a low gradual risk for impact
speeds up to 20mph, thereafter some studies suggest that this low risk rises as
speeds increase towards 30mph and in some locations/instances the risk rises
more steeply. This suggests that there are many other factors involved in
accidents on built up roads rather than just speed. 
Within Moray around 12% of accidents in built up areas have identified speed as
a contributory factor. Whereas on rural roads, speed is a factor in around 30% of
reported injury accidents.
This indicates that with 70% of injury accidents occurring on rural roads in Moray,
and 30% of those accidents having speed as a contributing factor, accident
reduction in Moray should be focussed on rural roads rather than in built up areas. 
Around one third of Moray residents injured in Scotland are injured on a Trunk 
16 The role of speed in the frequency and severity of Road Traffic Collisions, NI Assembly
Page 100

Page 101

Road Safety Plan to 2030 Appendix 1
Page 21 of 45
Road. Within Moray itself one third of those injured are also injured on a Trunk
Road. This indicates that the partnership approach with Transport Scotland and
Amey is crucial to assisting in reducing accidents and their severity in Moray. 
Casualties by home residence
Across Scotland during the baseline period (2014-18) only 1% of people injured
in road accidents in Scotland, were injured in Moray. Moray has approximately
2.9% of the Scottish Road network17 and 2% of the Scottish population.18 This
shows that the relative risk of being involved in a crash in Moray is between half
and a third of the rest of Scotland.
The chart below indicates where those injured in Moray come from. 
Source: MAST by Agylisis (2014-18)   
17 Scottish Transport Statistics 2022 Table 4.2
18 Scotland’s Census 2022 – Rounded population estimates
Page 101

Page 102

Road Safety Plan to 2030 Appendix 1
Page 22 of 45
Risk by road type
The table below shows the relative risk for injury accidents when travelling on ‘A’
roads within Moray for the Road Safety Framework to 2030 base line period of
2014 to 2018. This risk is calculated separately for urban and rural sections of
road and is related to the length of the relevant section of road to give a
comparable rate per kilometre.
Baseline Period 2014-2018 (totals)
Road
No
Urban
Casualties
Rural
Casualties
Total
casualties
Urban length
(km)
Rural length
(km)
Urban rate
(cas/km/pa)
Rural rate
(cas/km/pa)
A95 0 10 10 0.5 13.7 0.00 0.15
A95(T) 4 30 34 2.8 34.7 0.28 0.17
A96(T) 34 85 119 8.7 54.5 0.78 0.31
A98 1 21 22 1.6 19.3 0.12 0.22
A920 1 0 1 0.0 6.1 0.00 0.00
A939 0 7 7 0.9 17.2 0.00 0.08
A940 0 2 2 2.2 20.9 0.00 0.02
A941 15 59 74 10.3 47.0 0.29 0.25
A942 4 1 5 6.1 5.0 0.13 0.04
A990 1 0 1 3.0 2.8 0.07 0.00
B roads 16 98 114 43.7 254.2 0.07 0.08
All
other
roads
72 33 105 374.7 1128.7 0.04 0.01
All
Moray
roads
148 346 494 454.5 1604.1 0.07 0.04 
The rate calculated for all Scottish rural ‘A’ roads is 0.27 casualties/km per
annum. The A96 then A941 have the highest per kilometre rates in Moray. The
A96 at 0.31 casualties/km per annum is higher than the Scottish rate for all A
roads, with the A941 a little below the Scottish rate. The next A road, the A98,
has a rate well below that of the A96, A941 and the overall rate for A roads in
Scotland.
Page 102

Page 103

Road Safety Plan to 2030 Appendix 1
Page 23 of 45
Considering where the driver associated with a casualty lives on each route
provides further insight into accident trends and patterns. Between 2014 and
2022, of injury accidents on the A95 and A96, 55% involve Moray drivers. For the
A98, this figure increases to 73% of drivers involved in an injury accident living in
Moray and for the A941 the proportion increases again to 79% of drivers. Across
the ‘A’ road network the average is 63% drivers residing in Moray followed by
17% from Aberdeen, Aberdeenshire and Highland 5% from the rest of Scotland
and 15% either unknown or outwith Scotland. 
Source: MAST by Agylisis (2014-18) 
This indicates that the injury accidents reported on rural roads such as the A98
and A941 where there are higher rates per kilometre per annum are more likely
to involve drivers who are local residents and should be familiar with the road
network.
Page 103

Page 104

Road Safety Plan to 2030 Appendix 1
Page 24 of 45
Casualties by road user type
Looking at specific categories of road users, when compared to Scotland, the
relative risk of being injured in an accident in Moray is much lower than the whole
of Scotland as shown in the diagram below. 
Source: MAST Scotland database 2018-2022, Road Safety Analysis Ltd. 19 
Comparing Moray with similar authorities, (Aberdeenshire, Stirling and the
Borders) with respect to rurality, proportion of rural roads in their network, and
population profile and population density shows similar accident and casualty
trends to Moray.
It is therefore important to consider the relative risk, rurality and specific
characteristics of injury accidents in Moray when developing interventions, as
opposed to following the Scotland wide approach.
Age (Pre, young and older drivers)
Moray’s population has remained virtually unchanged in the past 10 years 20 and
currently (2022) stands at 93,400. Population estimates for Scotland indicate that 
19 MAST Online Road Safety Analysis
20 Scotland's Census 2022 - Rounded population estimates                                       
Pedestrians
Pedal Cycles
Chidren  1  or under
Motorcycle
lder  rivers 6   
oung  rivers  16 24                                                      
Casualty risk rate inde  in Moray, relative to Scotland
Page 104

Page 105

Road Safety Plan to 2030 Appendix 1
Page 25 of 45
the population is aging with over 20% being over 65 years old compared to 16.1%
10 years ago and just 12.1% 50 years ago. In Moray the figure is about 23%.
The aging population presents its own challenges with respect to road safety.
Driver training for those who have been driving for some time, is difficult to ‘sell’,
and issues such as eyesight and prescription drugs require careful handling. Joint
working with the NHS and other parties is required to persuade individuals to be
aware of these issues.
The younger population, under 25, is around 23,900 or around 25% of the
population. This is a reduction from 29% in 2011.
Schools, and their role in providing Road Safety advice is crucial to pre drivers
and young people in general. Curriculum based material is available nationally
from Road Safety Scotland. Joint working with Education and Lifelong Learning
to develop Road Safety Champions who can share and provide advice on this
material to their fellow pupils is one way to disseminate road safety messages to
this age group.
Accidents involving young drivers has reduced by over 80% in the past 15 years.
There are many factors which have contributed to this including the rising cost of
insurance and fuel along with interventions previously carried out by the Police
before 2013. In the years during COVID19 the reduction is 50% over the 2014-
18 average. The introduction of free bus travel to under 22 year olds in January
2022 may also be a factor in this reduction. 
The Cost of Accidents
The UK Government produces figures each year which reflects on average how
much an accident costs to society. It takes into account the costs of the police
and other emergency services, medical costs, lost output (e.g. loss of earning
capacity), damage to property, and a sum which reflects the effects of pain, grief,
suffering etc. i.e. the emotional impact of an accident. Average costs are shown
below for Scotland21, according to the severity of the injury. 
21 Reported Road Casualties Scotland 2021, Table 10
Page 105

Page 106

Road Safety Plan to 2030 Appendix 1
Page 26 of 45 
Severity of Accident Cost
Fatal £ 2,309,788
Serious £ 273,510
Slight £ 27,985 
Over the past five years, the cost of accidents in Moray amounted to some £15
million. 
The Council is committed to improving road safety and has approved capital
funding of £105,000 for 2024/25. On-going Capital funding will be required to
ensure that any required engineering improvements identified through the life of
the Road Safety Plan can be developed and delivered. Transport Scotland,
through Amey, has also programmed engineering improvements for the two
Trunk Roads in Moray namely A96 Inverness to Aberdeen road and A95
Aviemore to Keith road. This expenditure has been complemented both by the
financial support and manpower resources of the police, fire, ambulance, health
board and other council services in education, enforcement and encouragement.
The Scottish Government has recently introduced a new Road Safety
Improvement Fund as part of the funding to support the Road Safety Framework.
Funding was secured for 2023/24 for two improvement schemes in Moray; the
first for works at the A940 at Glenernie and the second to improve road markings
(lining) and cats eye upgrades on A940 and A941. Bids will continue to be
submitted for future years. 
Furthermore, progress on improving the cycle and walking network has been
given a major boost by the increases in Cycling, Walking and Safer Routes
funding which has been received from Scottish Government annually since 2001.
Although primarily for improvements to the active travel network, these have a
positive road safety benefit for these vulnerable road users and help pedestrians,
cyclists and wheelers to feel more confident when using the road network.  
Page 106

Page 107

Road Safety Plan to 2030 Appendix 1
Page 27 of 45
Issues and Actions
The aim of this plan is to contribute to the delivery of Scotland’s Road
Safety Framework to 2030 with the vision ‘For Scotland to have the best
road safety performance in the world22.
This is to be achieved through: 
• Safe Road Use
• Safe Vehicles
• Safe Speeds
• Safe Roads and Roadsides
• Post-Crash Response 
Road safety is defined as any policy, project, plan, programme or strategy which
aims to reduce the number and severity of road traffic casualties or reduces road
danger with better education or through the design, building, operation or use of
the road system. 
There are a number of measures which can be used to help reduce the number
and severity of road accidents. These fall into three broad categories:
• Education
• Engineering
• Enforcement
The behaviour of road users is influenced by educational methods and
engineering measures. Enforcement of the traffic legislation is necessary when
that behaviour is irresponsible or dangerous. However, the aim of the education,
engineering and enforcement measures are to encourage everybody to adopt
safer practices when on their daily journeys. 
22 Scotland's Road  Safety  Framework to 2030
Page 107

Page 108

Road Safety Plan to 2030 Appendix 1
Page 28 of 45
Issues
The main issues identified from the data are:
• The prevalence of accidents on rural roads;
• Ongoing maintenance of the road network;
• Driver behaviour and speed management;
• Ongoing education of road users; and
• Provision of cycle and walking infrastructure. 
The following sections describe the interventions which are currently being
pursued by the key public bodies involved in the development of this plan to
address the above issues. The interventions are grouped under the Safe System
areas set out in Strategic Framework and Partnerships section of this Plan.
Safe Road Use
This is achieved from road users who decide the most sustainable way to travel,
know and comply with road rules and take responsibility for the safety of
themselves and others, especially the vulnerable.
Safe road users are competent at all levels, including: paying full attention to the
road ahead and the task in hand; adapting to the conditions (weather, the
presence of other users, etc.); travelling at lower speeds; not driving while
impaired through drink, drugs (including medicines) or fatigue; not being
distracted by in-vehicle technology (mobile phones, entertainment systems, ‘sat
navs’, etc.); and giving sufficient room to all other road users, no matter what their
mode of travel.
Throughout Moray we are continuing to improve the active travel network to help
users make sustainable choices. Many of these improvements are funded from
external grants for example Sustrans, Places for Everyone and the annual
allocation from Scottish Government for Cycling, Walking and Safer Routes
projects. 
Page 108

Page 109

Road Safety Plan to 2030 Appendix 1
Page 29 of 45
There are various local and national campaigns on safe road use such as the
National ‘Think! Campaigns covering areas such as The Highway Code, mobile
phone use, seat belts, speeding on rural roads, vehicle safety checks,
motorcycling, country road driving, drug and drink driving, cycle safety and
education and games for primary aged children.23
In Scotland, a similar organisation, Road Safety Scotland was launched in 1985
as The Scottish Road Safety Campaign, becoming Road Safety Scotland in 2005.
Road Safety Scotland (RSS) is part of Transport Scotland, the Scottish
Government’s transport agency.24.
RSS’s work is based on research and evaluations of previous campaigns and
road safety initiatives. The most recent campaigns have been around: 
• Use of Seatbelts;
• Young Driver Campaigns;
• Driver Fatigue:
• Road User Advice;
• Children and Educators:
• Cycling:
• Horses and Road Safety; and 
• In Car Child Safety.
Seatbelts
It only takes seconds to put on a seatbelt. But it’s a simple act that could save
your life. On average 13%25 of those killed on roads in Scotland over the last five
years were not wearing a seatbelt. Seat belt wearing became compulsory in
1983. 
23 Think campaign website https://www.think.gov.uk/ 
24 Road Safety Scotland website https://roadsafety.scot/campaigns/ 
25 PACTS: Seat Belts – time for action
Page 109

Page 110

Road Safety Plan to 2030 Appendix 1
Page 30 of 45
Young Drivers Campaigns
Young drivers have been identified nationally as being over represented in the
casualty statistics. In the early 2000’s Moray and across the north east had a real
issue with young drivers crashing. This was tackled by campaigns with the Police
and education events such as Safe Drive, Stay Alive. However, numbers have
reduced considerably and are no longer the major issue they once were. This
should not lead to complacency and Road Safety Scotland’s  RSS  campaigns
should continue to be supported. The RSS ‘ rive like Gran’s in the Car’
campaigns cover subjects such as
• Drink Driving
• Drug Driving
• Speeding 
• Distraction
• Vulnerable road users (motorcyclists, cyclists, pedestrians and horse
riders)
The campaign concentrates on messages such as “Crash and you’ll no be able
to come round for my mince and tatties!”26 and uses humour to get the road safety
messages across.
Driver Fatigue
Driver fatigue causes hundreds of road accidents each year. And these accidents
are roughly 50% more likely27 to result in death or serious injury. When drivers
fall asleep, the police find no signs of braking, or any avoiding actions, so there
is a tendency to result in higher-speed collisions. This is a particular concern for
Moray with long distances to travel to the central belt for work and deliveries. 
Whilst, it has been difficult to identify this specific issue in the accident statistics 
26 Young drivers drink driving campaign
27 Driver fatigue campaign
Page 110

Page 111

Road Safety Plan to 2030 Appendix 1
Page 31 of 45
to date, driver fatigue .will remain a focus when analysing data and supporting
any national campaigns. 
Road User Advice
Road Safety Scotland provides advice to drivers, by life stage, behaviour and for
other road users and for visitors on driving in Scotland. 28 Older Drivers are of
particular concern across Scotland. In Moray, however, the numbers are low and
the older population is not over represented in the accident data. There are some
concerns about people driving longer than they should, particularly with poor and
failing eyesight. This may be a result of the rurality of Moray and having limited
public transport alternatives. 
Children and Educators
Road Safety Scotland aims to provide road safety learning at every level,
engaging children and young people. RSS Children and Educators. The learning
resources link to the seven principles of Curriculum for Excellence. 
Cycling
Most accidents to cyclists in Scotland happen on built up roads. Cycling Scotland
provides training and information to help improve cyclists’ safety. In Moray,
Primary Schools participate in Bikeability training for pupils and the Moray Bothy
project provides road safety advice for new and returning cyclists, including led
rides to help build confidence.
Horses and Road Safety
Working with the equestrian community can to encourage a high level of safety
awareness among riders. The British Horse Society (BHS) has been awarded the
Prince Michael International Road Safety Award for its contribution to Road
Safety. Visit Equestrians on the road. The BHS have undertaken joint road safety
campaigns with local authorities in England and it is understood that they are 
28 RSS Road User Advice
Page 111

Page 112

Road Safety Plan to 2030 Appendix 1
Page 32 of 45
seeking to engage with Transport Scotland to undertake similar joint road safety
campaigns in Scotland.
In-Car Child Safety 
RSS is a key partner in the Scottish In-Car Child Safety Campaign. This is an
ongoing campaign aimed at improving the safety of all children in vehicles. A
major element of this is the provision of advice and information on the correct
fitting of child car seats visit Good Egg Car Safety or Carrying Children Safely. In
Moray partnering with Good Egg through their training programme will enable the
local delivery of this advice. Staff have attended the specific training provided by
Good Egg. 
Safe Vehicles
Well-maintained vehicles reduce the risk of collisions and, in the event of a
collision, reduce the harm to road users, including pedestrians, cyclists, horse
riders, motorcyclists and vehicle occupants. 
Police Scotland target drivers of vehicles with expired MoT certificates as these
vehicles are more likely to be less well maintained. Under inflated tyres can
contribute to both vehicle and cycle accidents.
In-vehicle safety has been improving steadily with the introduction of seatbelts,
airbags, lane control and other vehicle control measures. 
As mentioned above the correct fitting of child car seats is crucial to improving in
vehicle safety. The Euro NCAP safety ratings can inform potential owners of the
safety features in vehicles. 
Safe Speeds
The aim is that road users understand and travel at appropriate speeds to the
conditions and within the speed limits. 
Page 112

Page 113

Road Safety Plan to 2030 Appendix 1
Page 33 of 45
Traffic survey information is collected regularly and used to respond to complaints
about speeding and, where appropriate, this data is shared with Police Scotland.
Traffic speed and volume data is also collected before and after proposed
schemes and developments to inform the decision-making process and reflect on
a scheme’s outcomes. It also helps determine the appropriate speed limits to post
for built up areas, in particular where new developments are taking place at the
edge of settlements. Existing speed limits are regularly reviewed for new
developments or as the result of concerns raised by communities. 
The key factors that should be taken into account in any decisions on local speed
limits are:
• history of collisions;
• road geometry and engineering;
• road function;
• composition of road users (including existing and potential levels of
vulnerable road users);
• existing traffic speeds; and
• roadside environment.
Enforcement of posted speed limits is carried out by both Police Scotland and
Safety Cameras Scotland. Safety Cameras Scotland is the collective name for
the North, East and West Safety Camera Units. This is an arms-length
organisation governed by Transport Scotland through the Scottish Safety
Camera Programme, but working within Police Scotland.
The site selection process for the Safety Camera unit is based on accidents and
where they happen. The process for determining new sites is described in
Appendix 1. 
Page 113

Page 114

Road Safety Plan to 2030 Appendix 1
Page 34 of 45
Safe Roads and Roadsides
This aim of the Safe System seeks to provide roads that are self-explaining in
that their design encourages safe and sustainable travel so that they are
predictable and forgiving of errors.
With the majority of accidents resulting in people being injured happening on rural
roads in Moray, this is where the majority of interventions have taken place in the
past, including Route Accident Reduction Plans (RARPs). The most recent of
these was on the B9008 and involved review of the road markings, in some
places removing the centreline and replacing with edge lines to reduce verge
overrun. This was done at locations where the road width is less than 5.5m wide
and hence too narrow to allow 2 vehicles to pass safely. Signing was also
reviewed to give a consistent message and highlight features such as narrow
bridges and bends where accidents have happened. This type of work has been
carried out on the A roads in the past, but requires ongoing maintenance to keep
the messages clear and consistent. 
Adequate and appropriate road maintenance is crucial to achieving safe roads
and roadsides. Potholes, poor conditions of the surface, low skid resistance,
overgrown verges, poor drainage, lack of visibility, no footway or cycle route, worn
road markings, unclear signing and trees can all contribute to crashes happening
on rural roads, before driver error or inappropriate speed comes into the situation.
Additionally surface dressing can cause issues for motorcyclists due to the loose
chippings and uneven surface. 
Recently, funding from the Road Safety Improvement Fund (RSIF) has become
available for specific schemes. Improving the road markings (centreline and edge
lines) and cats’ eyes on both the A941 and A940 were the main schemes to
receive funding from the RSIF in 2023/24, which works undertaken which will
have a direct impact on providing safer roads and roadsides. 
Through the Moray Active Travel Strategy consultations and focus groups a clear
desire was identified for inter-settlement cycle infrastructure and this will
contribute to both the road safety and climate change agenda by providing
sustainable commuter routes. However, such schemes have high costs and often
Page 114

Page 115

Road Safety Plan to 2030 Appendix 1
Page 35 of 45
require third party land. The Council will continue to support community groups
with this aim and may seek specific funding to support their delivery, where there
is a clear positive business case.
Transport Scotland is responsible for the trunk roads within Moray. These are the
A96 and the A95 from Keith to the Highland Council boundary. 
Transport Scotland, through its Operating Companies, undertakes an annual
review of collisions on the trunk road network to identify cluster sites, or routes
with recorded collisions that may be worthwhile of further investigation. The
screening process, together with a detailed understanding of collision trends
around the network, results in a prioritised programme of sites that are
investigated further. This evidence-led approach ensures that resources can be
targeted at locations where the greatest potential for casualty reduction is
available. This approach has been successful in reducing casualties across
Scotland’s trunk road network.
Amey (Trunk Road Operating Company for the North East) apply the Safe
System approach as described in Scotland’s Road Safety Framework to 2030 to
deliver an evidence-led casualty reduction programme to work towards meeting
the Scottish Government’s casualty reduction interim targets to 2030.
Carrying out Safety Audits on new schemes can identify issues which may cause
accidents and seek to reduce them before the scheme is fully operational. Safety
Audits will be undertaken on significant schemes promoted by the council. 
Developers are required to provide and act on Safety Audits for their works on
the public road and where they are creating new sections of public road. These
will continue to be a requirement to support Planning Applications and
applications for Road Construction Consent. 
Post-Crash Response
When a crash happens the response ranges from no emergency services
attending to all of them being present and can include the air ambulance. 
Page 115

Page 116

Road Safety Plan to 2030 Appendix 1
Page 36 of 45
It is vital to work with the emergency services and the National Health Service
(NHS) to enable the best possible response to collisions, ensure victims are
effectively cared for, and facilitate meaningful investigations into the causes and
potential solutions for the future. Health outcomes for victims rely on the ability of
the system to quickly locate and provide emergency first responder care, to
stabilise victims and transport them to hospital for further specialist treatment.
Additionally the Health and Social Care Partnership provides information on
recovery, ongoing health benefits of active travel and eyesight information. 
Each of the services have a local service plan:
• Police Scotland through their Moray Local Policing Plan29 
• Scottish Fire and rescue Service through their Local Fire and Rescue
Plan30
• Scottish Ambulance Service in Our 2030 strategy with respect to Major
incidents31
• NHS Grampian
• Health and Social Care Moray underpinning the work in health
improvement.32
These services and the aftercare are crucial to the outcome of any casualties. 
29 Moray Local Policing Plan 2023-2026
30 https://www.firescotland.gov.uk/your-area/
31 Scottish Ambulance Service - Our 2030 Strategy
32 https://www.gov.scot/publications/scotlands-public-health-priorities/
Page 116

Page 117

Road Safety Plan to 2030 Appendix 1
Page 37 of 45
What we are going to do
Although the number of people injured on Moray’s roads is low, there is no room
for complacency. There are ongoing concerns such as the aging population and
the ongoing climate crisis which is encouraging the wider use of sustainable
forms of travel such as walking and cycling. Rural roads remain a concern as this
is where the majority of crashes happen in Moray and in particular on the Trunk
Road network.
Journeys to school by sustainable means have remained broadly unchanged at
around 50%. However, the numbers of pupils being driven has gradually crept up
over the years along with those being driven part of their journeys at the expense
of travel by bus. This could be a reflection of ‘parental choice’ with School buses
not being available to out of zone pupils. 
Actions
The following key actions have been identified based on the analysis of the
accident data, the aims of the Road Safety Framework to 2030 and the joint
working partnerships within the RSNES group.
Action Target Date Who Safe
System
Contribute to the North East
Scotland Road Safety Strategy 
tbc All  Safe Road
Use; Safe
Speeds;
Safe Roads
and
Roadsides,
Post-crash
response
Investigate options for a Moray
Road Safety Group and better
connections with the Trunk
Road operating company
2024-25 Moray Council
Transportation
and Transport
Scotland/Amey
Safe Road
Use; Safe
Speeds;
Safe Roads
and
Roadsides,
Post-crash
response
Page 117

Page 118

Road Safety Plan to 2030 Appendix 1
Page 38 of 45
Continue to carry out road
accident analysis on an annual
basis and otherwise as identified
and to use this information to
carry out effective and
appropriate AIP engineering
measures.
On-going
throughout
the term of
the Plan to
2030.
Moray Council
Transportation,
Amey./
Transport
Scotland
Safe Roads
and
Roadsides
Support the North Safety
Camera Unit to identify sites for
enforcement and to make
representations to the Scottish
Safety Camera Programme
Office to consider appropriate
criteria for speed camera sites.
On-going
throughout
the term of
the Plan to
2030.
Police
Scotland,
Moray Council
Transportation,
Amey /
Transport
Scotland
Safe
Speeds
To continue to support Road
Safety Scotland
On-going
throughout
the term of
the Plan to
2030.
Moray Council
Transportation,
Police
Scotland,
Transport
Scotland
Safe Road
Use
Support Police Scotland with
their Motorcycle operation in a
bid to reduce accidents
On-going
throughout
the term of
the Plan to
2030.
All and
involving this
road user
group
Safe Road
Use; Safe
Speeds
Concentrate resources on
reducing the number and
severity rural accidents,
particularly those associated
with speed.
On-going
throughout
the term of
the Plan to
2030.
All  Safe Roads
and
Roadsides
Review young and pre-driver
interventions, e.g. Police
Scotland New Driver Scheme;
and monitor the effectiveness.
By 2025 All Safe Road
Use; Safe
Speeds
Investigate proposals for school
Road Safety Champions
By 2025 Council Safe Road
Use
Review how best to deliver road
safety advice and information
By 2024 Council, Safe Road
Use
Page 118

Page 119

Road Safety Plan to 2030 Appendix 1
Page 39 of 45
Support national campaigns On-going
throughout
the term of
the Plan to
2030.
All Safe Road
Use
Police Scotland to continue to
take a ‘hard line’ approach to
young drivers involved in risky
or antisocial behaviour
On-going
throughout
the term of
the Plan to
2030.
Police
Scotland
Safe Road
Use
Seek to develop Community
Council understanding of
accident risks and traffic
speeds, and have ‘Champions’
who can assist with
disseminating of Road Safety
campaigns and information
2024 All Safe Road
Use
Continue to seek funding to
construct off road cycle tracks to
provide segregation for
vulnerable road users
On-going
throughout
the term of
the Plan to
2030.
Roads Safe Roads
and
Roadsides
Investigate options for the
delivery of adult and secondary
school cycle training
2025 Council Safe Road
Use
Fire and Rescue service will
seek to role out the ‘biker down’
initiative in Moray
2025+ Scottish Fire
and Rescue
Service
Safe Road
Use 
A mid-term review of progress towards the Road Safety Framework to 2030
targets and the above actions will be undertaken during 2027. This date has
been chosen as by then there will be 3 to 5 years of accident data available
which have not been impacted by the changes in travel behaviours by the
Covid-19 pandemic. 
Page 119

Page 120

Road Safety Plan to 2030 Appendix 1
Page 40 of 45
Future Targets
In 2040 the Scottish Government is due to set new targets and through the North
East Scotland Road Casualty Reduction groups, council officers will seek to
inform and influence these new targets.
Once the new Road Safety Framework to 2040 has been published, an updated  
Road Safety Plan will be produced in 2031/32 to coincide with any new targets. 
Page 120

Page 121

Road Safety Plan to 2030 Appendix 1
Page 41 of 45
Glossary of Terms
AIP - Accident investigation and prevention
Fatal casualty – a casualty who dies within 30 days of an injury being sustained
Fatal accident – an accident where at least one casualty is fatally injured
Serious casualty – a casualty who requires an overnight hospital stay or has a
major bone fracture
Serious accident – an accident where at least one casualty is seriously injured
Slight casualty – a casualty who sustains minor injuries or bone fractures, not
requiring an overnight hospital stay.
Slight accident – an accident where at least one casualty is slightly injured
KSI – Killed or seriously injured
AA – Automobile Association
DSA – Driving Standards Agency
NESCamp – North East Safety Camera Partnership
HiTrans – Highlands and Islands Regional Transport Partnership
NESTRANS - North East Scotland Regional Transport Partnership 
RSS – Road Safety Scotland
ACPO(S) – Association of Chief Police Officers in Scotland
ORR - Occupational Road Risk  
Page 121

Page 122

Road Safety Plan to 2030 Appendix 1
Page 42 of 45
Organisations Involved
Moray Council, Transportation Service, Traffic and Public Transport Sections
Moray Council, Education Service
Moray Council, Community Safety
Police Scotland
•  Aberdeen and North East Division Community Safety
• Road Policing Division
• North Safety Camera Unit
NHS Grampian
Scottish Fire and Rescue Service
Scottish Ambulance Service
Transport Scotland
Amey Limited, Trunk Road operating company 
Page 122

Page 123

Road Safety Plan to 2030 Appendix 1
Page 43 of 45
Appendix 1
Safety Cameras Scotland – Site selection process. 
Page 123

Page 124

Road Safety Plan to 2030 Appendix 1
Page 44 of 45
Through targeted camera enforcement and improving driver behaviour the aim
of Safety Cameras Scotland is to reduce the number of casualties on Scotland's
roads. This means the cameras are sited in the areas most in need in terms of
road casualty reduction, and deployed primarily where they will have the
greatest casualty and collision reduction potential.
Criteria for enforcement locations are set out in the Scottish Safety Camera
Programme Handbook and include:
• a history of injury collisions - have people been injured on this road and
how severely?
• speed profile - is there a problem with speed on this road?
• agreement from partners - do Police Scotland and the Roads Authority
agree that a safety camera is the right solution?
• enforcement strategy - what will be the best type of camera for this
location?
• site review - an annual review - is this camera reducing injury collisions?
Whilst regular enforcement locations follow the process above, in order to meet
demands the programme is able to offer short term and flexible deployment
locations that should be utilised where and when appropriate.
• Short Term Deployments - To improve operational effectiveness and
deployment flexibility, there will be occasions when short-term mobile
enforcement deployments are required. The Programme therefore
includes flexibility to reallocate provision in response to emerging issues
or one-off/short-term events where the expected change in traffic
behaviour has raised road safety concerns from stakeholders. Any
deployments of this manner are limited to a maximum period of 1 month.
• Flexible Deployments - A number of enforcement hours will be available
for deployments in support of improving driver behaviour and speed limit
compliance in high footfall areas where active travel could be encouraged
by lower speeds while reducing risk exposure. Flexible deployments
should be based around a clearly evidenced prioritisation considering
Page 124

Page 125

Road Safety Plan to 2030 Appendix 1
Page 45 of 45
speed and risk factors and will require a recent speed survey to evidence
the issue of speed.
Police Scotland Road Policing have responsibility for enforcement on fast roads.
We use Randomised Scheduled Enforcement Strategy (RSE)
This strategy has been utilised worldwide and targets high-risk locations at
specific times to create an image of police omnipresence. By applying this
concept, motorists will become increasingly uncertain and/or unable to predict the
location of enforcement activity, therefore positively influencing driver behaviour.
The locations and days identified each month are supported by analytical data
from collisions for that month in the previous 5 years.
Local Policing Teams have the ability to enforce speed limits within the built up
area. 
Page 125

Page 126

Page 126

Page 127

22/6/2023
INTEGRATED IMPACT ASSESSMENT COVERING 
• EQUALITIES & SOCIO ECONOMIC DUTIES
• HUMAN RIGHTS AND RIGHTS OF THE CHILD 
STAGE 1 - DO I NEED AN INTEGRATED IMPACT ASSESSMENT?   
Name of policy or proposal: 
Is this a  Mark X  below
New activity, programme or policy? 
Change to an existing activity, programme or policy? X
Budget proposal?   
Duties: tick the boxes you think apply No Maybe     Yes
Equalities: Will your proposal have an impact on groups with
protected characteristics? 
Consider the impact of your proposal on people and how they
access your services and information without barriers. 
X
Socio-economic 
Not every person/family has access to regular income or
savings. Will your proposal have an adverse impact on them
X  
Does your proposal impact on the human rights of people?  X  
Does your proposal impact on the rights of children and
young people 
X  
Reasoning
Briefly describe your reasoning for the responses given above: 
The actions from the Road Safety Plan to 2030 include providing infrastructure for
vulnerable road users, which include children and persons with impaired
mobility/senses.  The provision of such infrastructure will be to the benefit of these
groups. 
Item 9
Page 127

Page 128

22/6/2023
There would be no adverse socio-economic impact from the actions within the plan
asprovision of active travel infrastructure will also support travel for low income
groups who often do not have access to a vehicle.   
Likewise the Plan does not have any implications on Human Rights or the Rights of
Children. 
If you have answered “maybe” or “yes” to any of the Stage 1 questions above
then proceed to complete the Stage 2 Integrated Impact Assessment questions
below. 
If you have answered “no” to the Stage 1 questions above then provide the details
below and submit to [email] 
Lead Officer for developing the contract  Diane Anderson
Other people involved in the screening
(this may be council staff, partners 
or others i.e. contractor or community) 
Elaine Penny
Date 16 October 2023 
STAGE 2: INTEGRATED IMPACT ASSESSMENT 
Brief description of the affected service
1. Describe what the service does: 
The Transportation Service is responsible for Road Safety. 
Road Safety is a statutory duty and the Council is obliged under the Road Traffic Act
1988 (Section 39) to prepare and carry out a programme of measures designed to
promote road safety and prevent accidents. It is further recommended that each
Local Authority produce a Road Safety Plan which sets out the strategy for improving
safety and identifies clear targets. In this instance the targets are informed by the
Scottish Government Road Safety Framework to 2030. 
This is the seventh Road Safety Plan for Moray. 
Page 128

Page 129

22/6/2023
2. Who are your main stakeholders? 
Road users, by all modes of transport, across Moray.
Road safety partners - Police Scotland, Fire and Rescue Service, NHS Grampian,
Transport Scotland 
3. What changes as a result of the proposals? Is the service reduced or removed? 
There are no changes to the service resulting from the new Road Safety Plan. 
4. How will this affect your customers? 
As there is no change to service, there will be no impact on customers. 
5. Impact on staff providing the service – None duties with respect to Road Safety remain
unchanged. 
6. Please indicate if these apply to any of the protected characteristics
Protected groups Potential impacts and considerations
Race  
Disability  An action of plan is to provide more active travel
infrastructure to support movement by walking,
wheeling and cycling. The needs of mobility and
visually impaired road users will be taken into
account in the design of this infrastructure. 
Carers (for elderly, disabled or
minors) 
Sex 
Pregnancy and maternity (including
breastfeeding) 
Sexual orientation 
Age (include children, young
people, midlife and older people)
An action of plan is to provide more active travel
infrastructure to support movement by walking,
wheeling and cycling. The needs of road user,
(children, young people, midlife and older people)
will be taken into account in the design of this
infrastructure. 
Religion, and or belief 
Gender reassignment 
Inequalities arising from socio-
economic differences
An action of plan is to provide more active travel
infrastructure to support movement by walking,
wheeling and cycling. This is a benefit as persons
with a low income are less likely to have access to a
vehicle. 
Page 129

Page 130

22/6/2023
Human rights 
List of convention rights Describe, where applicable, if and how
specific rights are engaged  
Article 5: Right to liberty and
security 
Article 6: Right to a fair trial 
Article 8: Right to respect for
private and family life,
correspondence and the home 
Article 10: Freedom of expression 
Article 11: Freedom of assembly
and association 
Article 12: Right to marry 
Article 14: Prohibition of
discrimination (in relation to the
convention rights) 
Article 1 of Protocol 1: Protection
of property 
Article 2 of Protocol 1: Right to
education 
Article 3 of Protocol 1: Right to free
elections by secret ballot 
Children’s Rights and Wellbeing 
Relevant articles – UNCRC 
Article 2 – Non discrimination 
Article 12 – Respect of the views of the
child 
Article 3.1 – Best interest of the child 
Article 6.2 – Right to survival and
development 
7. Evidence. What information have you used to make your assessment? 
Performance data 
Page 130

Page 131

22/6/2023
Internal
consultation
This is the seventh Road Safety Plan for Moray. Internal
consultation and consultation with key stakeholders/partners
(e.g. Police Scotland) has been part of the development of this
plan. 
Consultation with
affected groups 
No direct consultation has been undertaken. However the
provision of active travel infrastructure is part of the Active
Travel Strategy which has been the subject of public and
stakeholder consultation.
Local statistics Accident data
National
statistics
Accident data
Other 
8. Evidence gaps 
Do you need additional information in order to complete the information in the previous
questions? 
No 
9. Mitigating action 
Can the impact of the proposed policy/activity be mitigated?  Please explain 
Proposed active travel infrastructure will support travel by foot, cycle, wheeling by
vulnerable road users including mobility/visually impaired persons, children and young
people, midlife and older people. 
The design of this infrastructure will take into consideration the needs of these groups. 
10. Justification
If nothing can be done to reduce the negative impact(s) but the proposed policy/activity
must go ahead, what justification is there to continue with the change?   
Page 131

Page 132

22/6/2023
SECTION 3 CONCLUDING THE IIA 
Concluding the IIA 
1. No potential negative impacts on any of the protected groups were
found.
X
2. Some potential negative impacts have been identified.
The impacts relate to: 
Reducing discrimination, harassment, victimisation or other conduct
prohibited under the Equality Act 2010 
Promoting equality of opportunity 
Fostering good relations 
3. The proposals interfere with human rights and/or the rights of the
child 
4. Negative impacts can be mitigated the proposals as outlined in
question 8 
5. The negative impacts cannot be fully mitigated but are justified as
outlined in question 9. 
6. Further consultation with affected groups is needed. 
7. It is advised not to go ahead with the proposals. 
Decision:
Set out the rationale for deciding whether or not to proceed with the proposed actions:
An action in the Road Safety is to provide active travel infrastructure which would be
utilised by users with protected characteristics (Disability and Age). An individual
Equalities Impact Assessment will be undertaken as individual schemes are developed to
seek to maximise the benefits of each scheme for these user groups. 
Date of Decision: 16 October 2023 
Page 132

Page 133

22/6/2023
Sign off and authorisation: 
Service Transportation
Department Economic and Commercial Services
Policy/activity subject to IIA 
We have completed the integrated impact
assessment for this policy/activity. 
Name: Diane Anderson
Position: Senior Engineer Transportation 
Date: 16 October 2023
Authorisation by head of service  Name: Nicola Moss
Position: Head of Environmental and
Commercial Services
Date:16 October 2023
Permission to publish on website - 
Please return this form to the Equal Opportunities Officer, Chief Executive’s Office. 
Page 133

Page 134

Page 134

Page 135

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 18 JUNE 2024 
SUBJECT: CONSULTATION RESPONSE HITRANS DRAFT REGIONAL
TRANSPORT STRATEGY 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the recently published draft Hitrans Regional
Transport Strategy and the consultation for the draft strategy. 
1.2 This report is submitted to Committee in terms of Section III (F) (15) To
exercise all functions of the Councils as Roads Authority including safety, the
detailed planning, design and construction, improvement, maintenance and
lighting of roads, bridges and other structures and excluding street naming
functions [see Section III (E)(6) above]. (16) To exercise the functions of the
Council under the Roads (Scotland) Act 1984 and other relevant legislation.
(17) To deal with traffic and transport management functions, including the
preparation and implementation of traffic management schemes. (18) To
exercise the function of the Council in relation to public passenger transport
under the Transport Act 1985. 
2. RECOMMENDATION 
2.1 It is recommended that Committee approve the Moray Council Response
to the Highlands and Islands Transport Partnership (Hitrans) Draft
Regional Transport Strategy. 
3. BACKGROUND 
3.1 Moray Council is a partner of the Hitrans Regional Transport Partnership.
Hitrans have developed a draft Regional Transport Strategy which sets out a
20-year vision for transport improvements across the region. This report is a
brief overview of the draft Hitrans Regional Transport Strategy which reflects
the National Transport Strategy and Moray Council’s recent Transport plans
such as the Active Travel Strategy and Action Plan and Road Safety Plan to
2030, approved by Economic and Development Committee on 14 November
2023 (para 5 of the Minute refers). 
Item 10
Page 135

Page 136

3.2  Moray Council Officers and Councillors have been involved in the 
development of the draft strategy over the past couple of years as a partner of 
Hitrans. A Moray Councillor (Cllr Amber Dunbar) sits on the Board and the 
Strategic Transport Services Manager acts as a professional advisor. Hitrans 
do a lot of work with Moray Council in terms of raising issues at a National 
level and working proactively and in partnership with staff in terms of funding, 
procurement and making best use of resources, in many of our projects such 
as our m.connect app and active travel initiatives. 
3.3 The draft vision is:
“Our transport networks and services will act to realise the economic potential
of our region through reducing the actual and perceived impacts of distance,
poor resilience and low population density.  By doing this, they will facilitate
economically and socially valuable activities for all, provide equality of
opportunity, enable people to live active and healthy lives and allow our region
to contribute fully to the national net zero emissions target.” 
3.4 There are six objectives of the strategy. The strategy will provide the strategic
framework for the development of transport in our region.
The six objectives are: 
1. Make a just transition to a post-carbon and more environmentally
sustainable transport network;
2. Transform and provide safe and accessible connections between and
within our city, towns and villages to enable walking, wheeling and cycling
for all;
3. Widen access to public and shared transport and improve connectivity
within and from/to the region;
4. Improve the quality and integration of public and shared transport within
and from/to the region;
5. Ensure reliable, resilient, affordable and sustainable connectivity for all
from/to our island, peninsular and remote communities;
6. Improve the efficiency, safety and resilience of our transport networks for
people and freight and adapt to the impacts of climate change. 
3.5     These objectives reflect Moray Council’s Corporate Plan, the Active Travel
Strategy and Action Plan and draft Road Safety Plan to 2030 which were
approved by this Committee at its meeting on ? November 2023 ( paragraphs
5 and 6 of the minute refers) 
3.6  There are 11 themes, and each theme has several policies underneath it. 
3.7  A copy of the draft Regional Transport Strategy is available in Appendix 1
and a copy of the full consultation response is available in Appendix 2. 
3.8  The consultation response states support for most of the draft Regional
Transport Strategy. The consultation response is neutral where it does not
affect the Moray Council area. For example, ferries for the Islands. 
3.9 The exceptions to this are: 
Page 136

Page 137

a) A recommended response that strongly agrees with the Policy ST7a “The
RTS restates our support for the full dualling of the A9 and A96, with early
prioritisation of the Elgin and Keith bypasses to dual carriageway
standards, following the already committed Inverness to Wester Hardmuir
scheme.” 
b) A response which disagrees with the policies ST8j and ST8k (around
alignment on parking management and parking enforcement) stating that
Moray Council would like to continue to be able to decide what is
appropriate for Moray in terms of parking restrictions, cost of parking and
enforcement. 
4  SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The draft Regional Transport Strategy links to the Corporate Plan. Our
young people grow up safe, well-educated and reach their full potential.
People lead healthy lives and have access to quality care when they
need it. Our businesses and communities prosper. Our natural
environment thrives for the betterment of all and the priorities; Tackle
Poverty and Inequality, Build Stronger Greener Vibrant Economy and
Build thriving, resilient, empowered communities.
(b) Policy and Legal
There are proposed new transport policies for the region within the draft
Regional Transport Strategy and this report is a consultation response to
them. 
(c) Financial implications
There are no financial implications at present within this report as it is a
consultation response to a draft strategy. 
(d) Risk Implications
There are no risk implications within this report. 
(e) Staffing Implications
There are no staffing implications within this report. 
(f) Property
There are no property implications relating to this report. 
(g) Equalities/Socio Economic Impact
There are no equalities/socio economic impacts arising from this report
but if the strategy is implemented there could be a positive impact on
equalities and access to transport. Integrated Impact Assessments have
previously been carried out for Moray Council’s Road Safety Plan and
Active Travel Strategy, which link into this draft Regional Transport
Strategy. The responsibility for determining the need / carrying out an IIA
for the Regional Transport Strategy itself sits with HITRANS. 
(h) Climate Change and Biodiversity Impacts
Page 137

Page 138

There are no climate change biodiversity impacts arising from this report
but if the strategy is implemented there could be positive impacts on the
environment through a reduction in carbon emissions from transport. 
(i) Consultations
The Depute Chief Executive (Economy, Environment and Finance),
Head of Environmental and Commercial Services, Legal Services
Manager, Chief Financial Officer, Climate Change Officer, Community
Support Unit
Manager, Equalities Officer and L Rowan, Committee Services Officer
have been consulted and their comments incorporated into this report. 
5. CONCLUSION 
5.1  This report is a brief overview of the draft Hitrans Regional Transport
Strategy. The draft strategy reflects the National Transport Strategy and
Moray Council’s recent Transport plans such as the Active Travel
Strategy and Action Plan and Road Safety Plan to 2030, approved by
Economic and Development Committee on 14 November 2023 (para 5 of
the Minute refers). It is recommended that this Committee approves this
consultation response in Appendix 2. 
Author of Report: Kelly Wiltshire, Strategic Transport Services Manager 
Background Papers: Hitrans Draft Regional Transport Strategy 
Ref: SPMAN-524642768-1112 
Page 138

Page 139

On behalf of the Highlands and Islands Transport Partnership 
Project Ref: 330610615 | Date: January 2024 
Registered Office: Buckingham Court Kingsmead Business Park, London Road, High Wycombe, Buckinghamshire, HP11 1JU 
Office Address: 3rd Floor, Capital Square, 58 Morrison Street, Edinburgh, EH3 8BP
T: +44 (0)131 297 7010   E: info.Edinburgh@stantec.com 
HITRANS Regional Transport Strategy
Draft Regional Transport Strategy 
Item 10
Page 139

Page 140

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
ii
Document Control Sheet
Project Name: HITRANS Regional Transport Strategy
Project Ref: 330610615 
Report Title: Draft Regional Transport Strategy 
Date: 17th January 2024 
Name Position Signature Date
Prepared by: Stephen Canning Senior Associate   09/01/24 
Reviewed by: Scott Leitham Director, Transport Planning    11/01/24
Approved by: Stephen Canning Senior Associate    17/01/24
For and on behalf of Stantec UK Limited 
Revision Date Description Prepared Reviewed Approved
v.2.0 26/03/24
Draft for consultation
following HITRANS
comments       
vFINAL 18/04/24 Minor amendments to
draft for consultation       
This report has been prepared by Stantec UK Limited (‘Stantec’) on behalf of its client to whom this
report is addressed (‘Client’) in connection with the project described in this report and takes into
account the Client's particular instructions and requirements. This report was prepared in accordance
with the professional services appointment under which Stantec was appointed by its Client. This
report is not intended for and should not be relied on by any third party (i.e., parties other than the
Client). Stantec accepts no duty or responsibility (including in negligence) to any party other than the
Client and disclaims all liability of any nature whatsoever to any such party in respect of this report. 
Page 140

Page 141

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
iii
Contents
RTS Foreward – HITRANS Chair – Cllr Uisdean Robertson .............................................................. 1
RTS Introduction ................................................................................................................................... 2
Executive Summary .............................................................................................................................. 7
1 Introduction ............................................................................................................................. 20
1.1 Highlands and Islands Transport Partnership ............................................................. 20
1.2 Our Regional Transport Strategy ................................................................................ 21
2 Policy and Planning Context ................................................................................................. 24
2.1 Overview ...................................................................................................................... 24
2.2 Policy context .............................................................................................................. 24
2.3 The demographic and spatial characteristics of our region ........................................ 26
2.4 The socio-economic characteristics of our region ....................................................... 27
3 Transport problems in our region ........................................................................................ 29
3.1 Overview ...................................................................................................................... 29
3.2 Transport networks in our region ................................................................................. 29
3.3 Recent trends .............................................................................................................. 31
3.4 Summary of transport problems in our region ............................................................. 32
4 Our Vision and RTS Strategy Objectives ............................................................................. 35
4.1 Our RTS Vision ............................................................................................................ 35
4.2 Our RTS Strategy Objectives ...................................................................................... 35
4.3 RTS Themes ............................................................................................................... 38
5 Strategy Theme 1: Transforming our communities and reducing the impact of transport
upon them ............................................................................................................................... 41
5.1 Overview ...................................................................................................................... 41
5.2 Reallocating road space to active travel ..................................................................... 41
5.3 Reducing the impact of traffic on our communities ..................................................... 42
5.4 Managing the impact of parking .................................................................................. 43
5.5 Facilitating sustainable land-use development ........................................................... 44
5.6 How does this Strategy Theme contribute to our RTS Objectives? ............................ 46
6 Strategy Theme 2: Connecting our communities ............................................................... 47
6.1 Overview ...................................................................................................................... 47
6.2 Improving and expanding walking, wheeling and cycling routes ................................ 47
6.3 Widening the availability of cycling .............................................................................. 49
6.4 Promoting walking, wheeling and cycling .................................................................... 51
6.5 How does this Strategy Theme contribute to our RTS Objectives? ............................ 51
7 Strategy Theme 3: Enhancing public transport connectivity ............................................ 53
7.1 Overview ...................................................................................................................... 53
7.2 Reducing social exclusion ........................................................................................... 54
7.3 Bus and coach services .............................................................................................. 54
7.4 Community and Demand Responsive Transport ........................................................ 61
Page 141

Page 142

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
iv
7.5 Railway services .......................................................................................................... 63
7.6 Railway stations ........................................................................................................... 65
7.7 How does this Strategy Theme contribute to our RTS Objectives? ............................ 66
8 Strategy Theme 4: Improving the integration, quality of and access to public and shared
transport .................................................................................................................................. 67
8.1 Overview ...................................................................................................................... 67
8.2 Public transport integration .......................................................................................... 67
8.3 Mobility hubs ................................................................................................................ 69
8.4 Travelling with bicycles to and on public transport ...................................................... 70
8.5 Access to and the quality of bus services ................................................................... 71
8.6 Access to and the quality of rail services .................................................................... 73
8.7 Access to and the quality of ferry services .................................................................. 74
8.8 Access to inter-island air services ............................................................................... 75
8.9 Blue Badge parking ..................................................................................................... 75
8.10 Access to and the quality of taxi services ................................................................... 75
8.11 Supporting those less able to use our public transport network ................................. 76
8.12 Improving public transport information ........................................................................ 76
8.13 Improving digital coverage in our region ..................................................................... 77
8.14 How does this Strategy Theme contribute to our RTS Objectives? ............................ 78
9 Strategy Theme 5: Providing connectivity that supports our island and peninsular
communities ........................................................................................................................... 80
9.1 Overview ...................................................................................................................... 80
9.2 Connectivity of island and peninsular communities .................................................... 81
9.3 Booking and ticketing arrangements ........................................................................... 83
9.4 Managing capacity on ferry services ........................................................................... 84
9.5 Modernising ferry fleets and infrastructure .................................................................. 85
9.6 Converting Lo-Lo routes to Ro-Ro .............................................................................. 87
9.7 Air network coverage ................................................................................................... 89
9.8 Inter-island air services ............................................................................................... 90
9.9 Fixed links .................................................................................................................... 90
9.10 How does this Strategy Theme contribute to our RTS Objectives? ............................ 92
10 Strategy Theme 6: Improving the efficiency of transport networks and supply-chains
and reducing their impact on our communities .................................................................. 93
10.1 Overview ...................................................................................................................... 93
10.2 Ferry freight capacity ................................................................................................... 93
10.3 Ferry freight fares ........................................................................................................ 94
10.4 Supporting the growth in rail freight ............................................................................. 95
10.5 Other freight transport ................................................................................................. 95
10.6 How does this Strategy Theme contribute to our RTS Objectives? ............................ 96
11 Strategy Theme 7: Improving the safety, reliability and resilience of our road and rail
networks .................................................................................................................................. 98
11.1 Overview ...................................................................................................................... 98
Page 142

Page 143

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
v
11.2 Road-based journey times .......................................................................................... 99
11.3 Network resilience ....................................................................................................... 99
11.4 Travel disruption information ..................................................................................... 101
11.5 Road maintenance .................................................................................................... 102
11.6 Road safety ............................................................................................................... 103
11.7 Rail service reliability ................................................................................................. 104
11.8 How does this Strategy Theme contribute to our RTS Objectives? .......................... 104
12 Strategy Theme 8: Facilitating sustainable visitor travel demand .................................. 106
12.1 Overview .................................................................................................................... 106
12.2 Improving active travel for those visiting our region .................................................. 108
12.3 Improving public transport interchange for those visiting our region ......................... 108
12.4 Enhanced rail services in peak season ..................................................................... 108
12.5 Parking provision, management and enforcement at tourist destinations ................ 109
12.6 Targeted road improvements where there is high seasonal demand ....................... 110
12.7 How does this Strategy Theme contribute to our RTS Objectives? .......................... 111
13 Strategy Theme 9: Decarbonising our transport, mitigating the effects of climate
change ................................................................................................................................... 112
13.1 Overview .................................................................................................................... 112
13.2 Decarbonising our public transport vehicle fleet ....................................................... 112
13.3 Vehicle pooling and vehicle sharing .......................................................................... 115
13.4 Zero-emission vehicle uptake and use ...................................................................... 116
13.5 How does this Strategy Theme contribute to our RTS Objectives? .......................... 117
14 Strategy Theme 10: Embracing new technologies ........................................................... 119
14.1 Overview .................................................................................................................... 119
14.2 Micromobility .............................................................................................................. 119
14.3 Mobility-as-a-Service ................................................................................................. 120
14.4 Connected and Autonomous Vehicles ...................................................................... 120
14.5 How does this Strategy Theme contribute to our RTS Objectives? .......................... 122
15 Strategy Theme 11: Reducing the cost of travel, particularly for those most in need . 123
15.1 Overview .................................................................................................................... 123
15.2 Transport poverty ...................................................................................................... 123
15.3 Reduce public transport fares ................................................................................... 124
15.4 Expand Road Equivalent Tariff .................................................................................. 126
15.5 Cross-operator ticket acceptance .............................................................................. 127
15.6 Expanding the scope and geographic coverage of national fares policies ............... 127
15.7 Expansion of the Air Discount Scheme ..................................................................... 128
15.8 Equitable road pricing ................................................................................................ 128
15.9 How does this Strategy Theme contribute to our RTS Objectives? .......................... 129
16 Delivering our Regional Transport Strategy ...................................................................... 130
16.1 Overview .................................................................................................................... 130
16.2 Developing an Action Plan ........................................................................................ 130
Page 143

Page 144

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
vi
16.3 Governance ............................................................................................................... 130
17 RTS Monitoring and Evaluation .......................................................................................... 132
17.1 Overview .................................................................................................................... 132
17.2 Key Performance Indicators ...................................................................................... 132 
Figures
Figure ES1: Our RTP area ...................................................................................................................... 7
RTS development process and timeline .................................................................................................. 8
Figure 1.1: Our geographic coverage – TTWAs and localities populations (Source: Office for National
Statistics)  .......................................................................................................................................... 20
Figure 1.2: RTS development process and timeline ............................................................................. 22
Figure 2.1: NTS2 priorities..................................................................................................................... 24
Figure 2.2: NTS2 Sustainable Travel Hierarchy and Sustainable Investment Hierarchy ..................... 25
Figure 2.3: HITRANS local authorities’ populations (Source: NRS mid-year population estimates) .... 26
Figure 3.1: HITRANS region road network, ferry connections and airports / airfields .......................... 30
Figure 3.2: HITRANS region railway network, ferry connections and airports / airfields ...................... 30
Figure 3.3: Trend in travel by mode in the HITRANS region (2019=100) ............................................. 31
Figure 4.1: RTS Strategic Objectives development process ................................................................. 35
Figure 5.1: Strategy Theme 1 – policy areas ........................................................................................ 41
Figure 6.1: Strategy Theme 2 – policy areas ........................................................................................ 47
Figure 7.1: Strategy Theme 3 – policy areas ........................................................................................ 54
Figure 7.2: Bus kilometres and passenger numbers in the HITRANS region (2019-20 = 100)(Source:
Scottish Transport Statistics 2022) ........................................................................................................ 55
Figure 7.3: Bus service frequencies across the HITRANS region (Source NaPTAN, Q2 2022) .......... 57
Figure 7.4: First bus from each stop in the HITRANS region (Source: NaPTAN, Q2 2022) ................. 58
Figure 7.5: Last bus from each stop in the HITRANS region (Source: NaPTAN, Q2 2022) ................. 59
Figure 8.1: Strategy Theme 4 – policy areas ........................................................................................ 67
Figure 9.1: Strategy Theme 5 – policy areas ........................................................................................ 81
Figure 10.1: Strategy Theme 6 – policy areas ...................................................................................... 93
Figure 11.1: Strategy Theme 7 – policy areas ...................................................................................... 98
Figure 12.1: Strategy Theme 8 – policy areas .................................................................................... 107
Figure 13.1: Strategy Theme 9 – policy areas .................................................................................... 112
Figure 14.1: Strategy Theme 10 – policy areas .................................................................................. 119
Figure 15.1: Strategy Theme 11 – policy areas .................................................................................. 123 
Tables
Table 4.1: Transport problem ‘themes’ .................................................................................................. 36
Table 4.2: Map of Strategy Objectives to NTS2 priorities ..................................................................... 38
Table 4.3: RTS Strategy Themes .......................................................................................................... 39
Table 4.4: Mapping of RTS Themes to Strategy Objectives ................................................................. 40
Table 5.1: Contribution of Strategy Theme 1 to our RTS Objectives .................................................... 46
Table 6.1: Contribution of Strategy Theme 2 to our RTS Objectives .................................................... 51
Table 7.1: Contribution of Strategy Theme 3 to our RTS Objectives .................................................... 66
Table 8.1: Contribution of Strategy Theme 4 to our RTS Objectives .................................................... 78
Table 9.1: Contribution of Strategy Theme 5 to our RTS Objectives .................................................... 92
Table 10.1: Contribution of Strategy Theme 6 to our RTS Objectives .................................................. 96
Table 11.2: Contribution of Strategy Theme 7 to our RTS Objectives ................................................ 104
Table 12.1: Contribution of Strategy Theme 8 to our RTS Objectives ................................................ 111
Table 13.1: Contribution of Strategy Theme 9 to our RTS Objectives ................................................ 117
Table 14.1: Contribution of Strategy Theme 10 to our RTS Objectives .............................................. 122
Table 15.1: Contribution of Strategy Theme 11 to our RTS Objectives .............................................. 129 
Page 144

Page 145

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
vii  Page 145

Page 146

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
1
RTS Foreword – HITRANS Chair – Cllr Uisdean
Robertson 
The Highlands and Islands Regional Transport Strategy 2008-2022 (RTS) was approved by
Scottish Minsters in 2008. It was informed and influenced by widespread public and
stakeholder consultation. The RTS, projects and themes from the associated Delivery Plan,
set out the key policies and proposals required to deliver our vision for transport in the region.
Much of the core policy framework and strategic direction of the RTS and its vision and
objectives remain valid today with a focus on a prosperous economy and on inclusive,
connected and healthy communities. However, there have been several changes to the policy,
economic, societal and environmental contexts within which our Partnership now operates,
and these are reflected in our updated Draft RTS.
The Scottish Government published its updated the National Transport Strategy in 2020. This
sets out four key priorities to support it vision: reducing inequalities; taking climate action;
helping deliver inclusive economic growth; and improving our health and wellbeing. At its heart
is the Sustainable Investment Hierarchy which is now being used to inform future investment
decisions and ensure transport options that focus on reducing inequalities and the need to
travel unsustainably are prioritised. It also highlights a need to focus on maintaining and safely
operating existing assets, taking due consideration of the need to adapt to the impacts of
climate change. 
It is in this context that HITRANS and other Regional Transport Partnerships have been
updating their Regional Transport Strategies. Our Draft RTS seeks to ensure that these
national outcomes are supported whilst also reflecting the local opportunities and challenges
within the HITRANS region. Our overarching Vision underpinning the Strategy is that that our
transport networks and services will act to realise the economic potential of our region
through reducing the actual and perceived impacts of distance, poor resilience and low
population density. By doing this, they will facilitate economically and socially valuable
activities for all, provide equality of opportunity, enable people to live active and
healthy lives and allow our region to contribute fully to the national net zero emissions
target.
In developing the Strategy and through an initial public consultation last year on the ‘Case for
Change’ report, we have already agreed a series of objectives against which our transport
problems and options for addressing them have been assessed. The Draft Strategy on which
we are now consulting considers the options identified in the Preliminary Options Appraisal
under 11 Strategy Themes, with each theme containing a set of individual policies. 
In responding to this consultation, we are keen to hear your views on each of these themes
and whether we have the correct policies to address the transport problems and challenges
that have been identified. We encourage as many individuals and organisations to respond as
possible. While we are keen to hear your views on all aspects of the Draft Strategy, we realise
that this is an extensive document so would encourage you to ensure that in responding you
highlight those areas that you feel are most important to both you and for the wider region.    
Page 146

Page 147

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
2
RTS Introduction
The original Regional Transport Strategy (RTS) was published in 2008. We refreshed the
Strategy in 2018 but following the publication of a new National Transport Strategy in 2020,
our Members considered it appropriate that we undertake a full update of our own Strategy to
ensure it reflected the current policy landscape and wider regional priorities. 
The development of the draft RTS has followed a staged process and we have already
completed the ‘Case for Change’ following a public consultation on a draft that sought initial
views on our proposed Vision and Strategy Objectives. Subsequently, we undertook a
Preliminary Options Appraisal report that appraised a long-list of options that had been
identified to address the transport problems in our region. Each stage has also been informed
by a multi-stage Strategic Environmental Assessment (SEA), Equalities Impact Assessment
(EqIA) and Island Communities Impact Assessment (ICIA).
We are now undertaking an eight-week statutory public consultation on the Draft Regional
Transport Strategy. The Draft RTS has placed shortlisted options into 11 themes with each
containing a set of policies to address the transport challenges and problems in the Highlands
and Islands. The final Strategy will provide the strategic framework for the development of
transport in our region for the next 20 years. It is necessarily a comprehensive document
requiring relevance to both immediate issues but also those medium to longer term challenges
that will take many years to address. 
Following the review of the public consultation, HITRANS will seek Ministerial approval of the
finalised Regional Transport Strategy, at which point we will also publish a Delivery Plan that
will set out our priorities for implementing the Strategy. The Delivery Plan will be updated
regularly, providing an opportunity to reset or realign priorities to the changing political, social,
environmental and economic landscape. 
Our work to date and early engagement with key stakeholders has highlighted a number of
priority areas that the Draft Regional Transport Strategy seeks to address. 
Firstly, the challenge of ensuring the reliability and resilience of our existing transport networks
and services let alone an improvement is increasingly evident. Severe weather events have
closed or disrupted our transport services with closures impacting the strategic network not
just at known areas of weakness such as the Rest and Thankful on the A83 but at multiple
locations throughout the region and with an increasing frequency. Our Draft RTS highlights the
need for all levels of government to work collaboratively and innovatively to better address and
mitigate these challenges. 
Similarly, we have seen increasing pressures on our lifeline ferry networks. The introduction of
Road Equivalent Tariff has seen significant success in growing demand for travel on the Clyde
and Hebrides Ferry Services (CHFS) network. However, that this success was not reinforced
with the timeous replacement of new vessels to replace life expired tonnage or to increase
frequency and has left a perception that this increased demand for travel on the network is a
bad thing. The impact of the eagerly anticipated six new major vessels into the CHFS fleet will
help address many of the recent significant resilience challenges that have so heavily
impacted the lives of islanders across the HITRANS region. 
However, there are many wider challenges impacting ferry services beyond the need for new
tonnage on the CHFS network. HITRANS has recently produced a report on the severe capital
and revenue pressures faced by those local authorities - Argyll and Bute, Highland, Orkney
and Shetland – that operate ferry services. HITRANS has also recently responded to the
consultation on the CHFS3 contract, highlighting a number of strategic changes which we and
our local partners feel are required to ensure that the future investment and operation of
services delivers for the communities it serves. The opportunity to fundamentally change how
Page 147

Page 148

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
3
we provide and operate services to our islands (and remote peninsular communities) must be
grasped.  
The Draft RTS reiterates our support for the early delivery of several committed transport
improvements in our region. These include the dualling of the A9 and A96. We have recently
written to the Cabinet Secretary highlighting our Board’s support for the early prioritisation of
the Inverness to Auldearn section and bypasses of Elgin and Keith that will provide an
opportunity to transform the centres of these two towns and that of Nairn with the removal of
the congestion and heavy goods traffic that they currently have to accommodate. Investment
in these key arteries and other sections of the strategic network that are still not constructed to
a suitable standard for the function they perform is essential for addressing issues relating to
road safety, driver frustration, journey reliability and perceptions of remoteness, and in doing
so, will help realise the economic potential of the Highlands and Islands. The A82 and A83
perform similar functions for the West Highland and islands economies, transporting the goods
and visitors to this region but also providing the connectivity necessary for our residents and
businesses to thrive. We would like to see the designed scheme for Tarbet to Inverarnan
progressed and a solution found for the negative economic and environmental impacts that
heavy strategic traffic are having on both Fort William and Oban. Recent work has highlighted
the value of the goods transported on our regional strategic network to the Scottish and UK
economies. We would like to see an expansion of support for projects that enable the transfer
of freight movements from road to rail and sea such as those funded through the Timber
Transport fund and Tesco in Inverness, but in many areas the road network remains the only
viable means of transporting heavy goods. 
In addition to these traditionally successful exports, the Highlands and Islands is well placed to
benefit from a number of recent economic developments. The huge potential to be realised
from ScotWind Leasing – the process of making seabed available for commercial-scale
offshore wind projects – is only starting to be realised but has the potential to benefit
businesses and communities in the region for decades to come as well as providing a major
boost to national clean energy production. With strategic oversight and collaboration there is
an opportunity to harness this and other renewable energy in the region to provide a ‘Just
Transition to Net Zero’ that will enable all aspects of the region’s economy to benefit from
decarbonising.
In 2023, it was announced that
Inverness and Cromarty Firth
Green Freeport was successful
in being awarded Green
Freeport status by the Scottish
and UK Governments. The
primary objective of the public
and private partnership is to
maximise the local benefits
from a pipeline of renewable
energy projects which will
create business opportunities
and employment, attract inward
investment, research and development, and position the Highlands at the heart of the
country’s commitment to becoming a net-zero economy. 
When operational, it is estimated that the Green Freeport will attract 10,000 jobs and £3bn of
investment. HITRANS has already been engaging with the Freeport and other key
stakeholders to understand the transport improvements required to support what will be a
step-change in economic investment within the area and enable the wider Highland economy
to benefit.  
Page 148

Page 149

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
4
There is now a recognition
across public and private
stakeholders that transport
networks and services need to
urgently decarbonise and
HITRANS has been at the
forefront of projects to realise
the regions renewable energy
surplus. HITRANS is now the
lead partner of the Sustainable
Aviation Test Environment
(SATE) project.  SATE, which
is based at Kirkwall Airport, is
the UK's first low carbon test
location at an operational
airport. 
The project and its partners
show emerging technologies along with real-world potential scenarios that seek to highlight
the environmental, social and economic contribution sustainable aviation can make. Similarly,
through the FASTER ERDF project we have worked with partner Local Authorities to roll out
EV charging Infrastructure in the West Highlands and islands. We will continue to work with
public and private partners to develop electric, hydrogen and other innovative alternative
fuelled options that can decarbonise all modes of transport in our region.
Our consultation and engagement to date has highlighted the increasing challenge our
residents face in accessing healthcare within our region. On a number of transport services
including some air links, passengers accessing healthcare can make up the majority of
passengers. The centralisation of healthcare provision into a number of specialised facilities
has resulted in increased journeys and the cost of accessing healthcare for both patients and
their families. HITRANS will seek to work with the NHS, local authorities and transport
providers to improve the options available to patients and reduce the need to travel wherever
possible. 
While the expansive geography and low
population density of our region can involve
travelling longer distances to access
employment and key services, the vast
majority of trips are, even in most rural areas,
within walking or cycling distance. Indeed, the
HITRANS region has the highest cycle to work
rates of any region and individual settlements
such as Elgin and Inverness the highest levels
for any large town or city in Scotland
respectively. We welcome the Scottish
Government’s recent move to provide more
direct funding for active travel infrastructure to
our local authority partners and the funding of
Regional Transport Partnerships to encourage
people to travel sustainably through the
utilisation of behaviour change funding. We are
currently developing an ambitious programme
of interventions for 2024/25 that will see the roll
out of cycle parking to key trip generators
across the region and the expansion of the HI-
Bike e-bike hire scheme within Inverness and
Fort William and into Elgin. 
Page 149

Page 150

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
5
We have highlighted
the increasing
challenge to the
resilience of our rail
network from climate
change but there are
also significant
opportunities for rail
to tackle many of the
underlying transport
challenges in our
area. Transport
Scotland’s Route
Map to reducing car
kilometres by 20% by
2030 has highlighted
that a small number
of longer journeys
account for a
disproportionate
percentage of total
car kilometres. Enhanced, reliable and affordable rail services and reduced journey times on
key inter-urban routes offer an opportunity to encourage significant modal shift on journeys
both within our area but also improved connectivity to the major urban centres in Scotland and
the rest of the UK. For this to be realised we need to see continued investment in expanding
the electrification of the network into our area. HITRANS was a key stakeholder in the new
Inverness Airport Station and will continue to make the case for investment in the
redevelopment of Inverness Station which is a Strategic Transport Projects Review 2 priority.
Improving the integration of transport services is another consistent theme which initial public
consultation has highlighted. Integration covers a myriad of different issues but at its heart is
the need for the public to have both confidence to undertake public transport journeys with
multiple legs with the security that they will reach their destination on time and, when there is
disruption, information on alternative arrangements is available. Improving transport
Integration is also about addressing the ease and cost of purchasing multi-modal journeys.
With the support of the Scottish Governments MaaS
Investment Fund, HITRANS has developed the award-
winning Go-Hi app which allows users to find, book and
pay for all of their travel in and around the Highlands and
Islands of Scotland in one place. We have also developed
and made available the Demand Responsive app Moove
Flexi, which allows passengers to book journeys on flexible services and track their progress
in real-time. This has seen passenger numbers grow on each service where it has been
deployed including in Moray, where under the successful m.connect brand it offers the first
council wide demand responsive transport service. We have also provided and operate over
150 real-time information displays at key interchanges and bus stops and produce static at-
stop information for over 2,000 stops across the region. We are keen to expand the provision
of these services in partnership with local authorities and operators. 
The most effective way to improve integration is often by increasing the frequency of services
which reduces the waiting time and pressure on connecting services. HITRANS, recently
published a paper on Rural Bus Service Support and Funding (March 2021) that identifies
some of the challenges which have led to a sharp decline in local bus services across
Scotland for the last 15 years or so. Frequency of bus use is, as expected, higher in urban
areas where more bus services operate. Much of rural Scotland continues to rely on
supported local bus services, and communities are dealing with the reduction and demise of
many routes in their areas. The national funding schemes for local bus services in Scotland all
Page 150

Page 151

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
6
favour urban areas and areas operating with commercial services. HITRANS will continue to
articulate the need for dedicated national funding streams for rural transport.
Tourism and visitors to our region have
been and remain a linchpin of the local
economy in the majority of the HITRANS
area. However, its recent growth and the
changing way in which people visit has
placed severe pressure on local
communities and the natural environment in
a number of areas. The Draft RTS seeks to
promote policies which enable us to provide
infrastructure and public transport services
that both reduces the impact of visitors but
also provides improved connectivity for
local residents.  
This introduction covers just a small selection of some of the fundamental transport challenges
in the Highlands and Islands which we are looking to address with local, regional and national
partners in the years ahead. We hope you take the opportunity to consider the Draft Regional
Transport Strategy and let us know what you think of the policies which we are proposing.  
Page 151

Page 152

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
7
Executive Summary
Overview
This Regional Transport Strategy (RTS) has been prepared by the Highlands and Islands
Transport Partnership (HITRANS), the statutory Regional Transport Partnership for much of
the Highlands and Islands covering the entire council areas of Comhairle nan Eilean Siar,
Moray Council, Orkney Islands Council, The Highland Council and Argyll and Bute Council
(Helensburgh and Loch Lomond excepted, which are covered by Strathclyde Partnership for
Transport, SPT). A map of our region is provided below: 
Figure ES1: Our RTP area
As an RTP, our core function under the Transport (Scotland) Act 2005 is to produce an RTS
for our region. The RTS sets out the transport needs of our region, identifies the practical
means of addressing these needs and sets out how transport will be provided, developed,
Page 152

Page 153

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
8
maintained, improved and operated. This Strategy has been prepared to fulfil this requirement
and replaces our previous RTS which was published in 2008. 
Our new RTS sets the strategic framework for the development of transport in our
region over the next 20 years. Its aim is to deliver a transport system that contributes to the
priorities of the National Transport Strategy 2 (NTS2) through reducing inequalities, taking
climate action, delivering inclusive economic growth and improving health and wellbeing.
How have we approached the preparation of our new RTS?
Our new RTS has been prepared in accordance with the Transport Scotland RTS
development guidance (2006), the revised (2022) Scottish Transport Appraisal Guidance
(STAG) and all relevant legislative and policy requirements. The RTS itself marks the final
step in a three-stage process which involved the delivery of a:
 ‘Case for Change Report’, published in early 2023, which detailed the transport
problems that need to be considered in the RTS and the RTS Strategy Objectives which
will underpin it.
 Preliminary Options Appraisal Report, produced in summer 2023, which generated,
developed, packaged and appraised options which could address the identified transport
problems.
The outputs from the ‘Case for Change’ and Preliminary Options Appraisal have been directly
incorporated into this RTS, as shown in the figure below: 
RTS development process and timeline
The preparation of our new RTS has also been informed by a multi-stage Strategic
Environmental Assessment (SEA), Equalities Impact Assessment (EqIA) and Island
Communities Impact Assessment (ICIA). These standalone and independent processes set
out how relevant environment, equalities and islands considerations were considered within
the RTS development process. SEA, EqIA and ICIA assessments of the Draft RTS
accompany this document.
Our RTS Vision and Strategy Objectives
Vision
Our RTS Vision is an expression of the type of region that we want the HITRANS region to be
and how transport can contribute to achieving that for everyone. It has been developed to
reflect national policy and legislation, most notably the commitment to net zero greenhouse
gas emissions by 2045, but at the same time reflects the very distinctive character of our
region. The Vision provides an overarching context within which our RTS Strategy Objectives
can sit and provides a long-term focus for HITRANS and our constituent members.
Page 153

Page 154

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
9
Our transport networks and services will act to realise the economic potential of our
region through reducing the actual and perceived impacts of distance, poor
resilience and low population density. By doing this, they will facilitate economically
and socially valuable activities for all, provide equality of opportunity, enable people
to live active and healthy lives and allow our region to contribute fully to the national
net zero emissions target.
RTS Strategy Objectives
The RTS Strategy Objectives: (i) provide the bridge between the transport problems in our
region and the outcomes that we are seeking through our RTS; and (ii) express how our RTS
Vision will be realised. In order to ensure that the process of setting RTS Strategy Objectives
was both systematic and rigorous, a seven-step bottom-up approach was adopted.
The RTS Strategy Objectives define the outcomes that we are trying to achieve through the
RTS. Emerging from ‘Step 6’ of the above referenced process, they are an aggregation of
individual Transport Planning Objectives (TPOs) set in relation to each specific transport
problem identified in the Transport Problems Framework. The Strategy Objectives are
therefore:
Strategy Objective 1: To make a just transition to a post-carbon and more
environmentally sustainable transport network.
Why? – Scotland has a target to achieve net zero carbon emissions of all greenhouse gases
by 2045 and transport is a key sector in terms of such emissions, accounting for 20% of
territorial emissions (CO2e) across the region1. The transport networks and services in our
region must adapt to fulfil this target in a fair and equitable way whilst also being developed in
as environmentally sustainable a way as possible. The process must also recognise the needs
of all groups through a ‘Just Transition’.
Strategy Objective 2: To transform and provide safe and accessible connections
between and within our city, towns and villages, to enable walking, wheeling and
cycling for all.
Why? – to allow everyone to walk, wheel and cycle more, leading to more local living patterns,
greater inclusion, affordable transport, healthier lifestyles, and reduced car use – the latter
leading to reduced emissions / noise etc and improved road safety.
Strategy Objective 3: To widen access to public and shared transport and improve
connectivity within and from / to the region.
Why? – to give people in the HITRANS region new travel choices, allowing them to: (i) use
accessible and affordable public or shared transport options to make journeys they previously
could not make; or (ii) to use public or shared transport instead of the car - this leading to
lower levels of car use and reduced emissions / noise etc., as well as improved road safety.
This objective is also important in encouraging inclusive economic growth by widening labour
markets and providing improved accessibility to employment opportunities by public transport.
Strategy Objective 4: To improve the quality and integration of public and shared
transport within and from / to the region.
Why? – to make public and shared transport in the HITRANS region more attractive and
competitive with car-based travel and to ensure the accessibility needs of all groups are
accommodated. This will improve the travel experience for existing public transport users and 
1 Derived from https://www.data.gov.uk/dataset/723c243d-2f1a-4d27-8b61-cdb93e5b10ff/uk-greenhouse-gas-
emissions-local-authority-and-regional 
Page 154

Page 155

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
10 
encourage people to use public or shared transport instead of the car, leading to lower levels
of car use and reduced emissions / noise etc, improved road safety and will support the social
benefits associated with shared transport.
Strategy Objective 5: To ensure reliable, resilient, affordable and sustainable
connectivity for all from / to our island, peninsular and remote communities.
Why? – some of our island and peninsular communities have suffered from pronounced
connectivity difficulties in recent years. This has had wide-ranging impacts on these
communities and this objective recognises the need to tackle this issue, in tandem with
Strategy Objective 4. Delivering this objective will provide the foundation for the long-term
sustainability and success of these vulnerable communities, including through helping meet
the needs of people with protected characteristics and by tackling socio-economic
disadvantage. 
Strategy Objective 6: To improve the efficiency, safety and resilience of our transport
networks for people and freight and adapt to the impacts of climate change.
Why? – our transport systems must be safe and able to adapt to changing demands (e.g.,
tourism patterns, trade etc) and be resilient in the face of climate change. This objective is
important in allowing the society and economy of our region to prosper and to reduce
inequalities of outcome associated with socio-economic disadvantage. 
RTS Themes and Policies
Following the completion of the Preliminary Options Appraisal, the shortlisted options were
aggregated into 11 Strategy Themes. The RTS Themes have been used to shape the
content of the RTS, with each theme containing a set of individual policies therein. 
Page 155

Page 156

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
11 
The Strategy Themes are summarised below, together with the inherent policies.
Strategy Theme 1: Transforming our communities and reducing the impact of transport
upon them
Improving the public realm and mobility within settlements by reducing the dominance of the private car
and maximising opportunities for walking, wheeling and cycling
Policy ST1a
The RTS supports the principle of reallocating road space, including parking, from
general traffic. This should support placemaking to shape improved walking, wheeling
and cycling opportunities in our communities as a means to promote safe active travel
and encourage use of active travel modes. Reallocation of road space should avoid any
negative impacts on bus services.
Policy ST1b Where traffic in settlements is reduced by investment in road infrastructure, road space
reallocation should be undertaken as an integral component of that investment. 
Policy ST1c
The RTS supports the principle of traffic calming and speed limit reductions and
enforcement where this is the wish of our communities, including on the Trunk Road
network.
Policy ST1d The RTS supports measures to reduce road-based severance in our communities.
Policy ST1e
The RTS recognises the challenges presented by the impacts of increasing abnormal
load movements across the region. It calls for a coordinated approach to be taken to
ensure that appropriate planning and mitigation is put in place as part of the planning
process for new developments that will generate such movements.
Policy ST1f
The RTS supports greater consistency (in ‘like-for-like’ locations) of parking
management across our region, including payment mechanisms, parking information
and enforcement.
Policy ST1g
The RTS supports the principle of improving the management and enforcement of
traffic and parking around schools, including School Streets (a road outside a school
with temporary restriction on motorised traffic at school drop-off and pick-up times). 
Policy ST1h The RTS supports the prioritisation of new development in locations that are in
proximity to key services and already well-served by active travel and public transport.
Policy ST1i
The RTS supports the local delivery of public services, including health and
education, and other day-to-day retail and personal services (e.g., banking) which
minimise the need to travel.
Policy ST1j
The RTS supports the integration of active travel, public transport and shared mobility
into the planning of all new developments. New development proposals should be
required to outline how they will connect into the local active travel and public transport
networks.
Policy ST1k The RTS supports the concept of ‘infrastructure first’ in relation to major developments
across our region.
Policy ST1l
The RTS recognises the centrality of environmental considerations, particularly
biodiversity enhancements and nature networks, within the planning and decision-
making process. 
Strategy Theme 2: Connecting our communities
Facilitating walking, wheeling and cycling within settlements and improving active travel connections
between them.
Policy ST2a The RTS supports transformational investment in the improvement of our existing active
travel networks to make these accessible to all.
Policy ST2b
The RTS supports the reinstatement and expansion of a network of strategic and local
traffic free / quiet walking, wheeling and cycling routes to connect communities
across and beyond our region.
Policy ST2c: The RTS supports the expansion of the National Cycle Network to all parts of the
region.
Page 156

Page 157

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
12 
Strategy Theme 2: Connecting our communities
Policy ST2d
Our active travel infrastructure should be designed to a high standard in accordance
with the most up-to-date best practice and regionally appropriate design standards
(as this evolves) to meet the needs of all users.
Policy ST2e The RTS supports the integration of active travel and public transport connections
within our communities.
Policy ST2f The RTS promotes the adoption of measures outlined in the Sustainable Travel to
Stations Strategy with respect to access to railway stations.
Policy ST2g
The RTS seeks the implementation of initiatives which widen access to bicycles and
e-bicycles, including e.g., promoting ownership, expansion of bicycle share and hire
and provision of new ‘first mile, last mile’ cycling opportunities.
Policy ST2h The RTS supports the upgrade and new provision of bicycle parking and facilities at
all public buildings, transport interchanges and key on-street locations within the region.
Policy ST2i
Our active travel network should be developed, presented and promoted in a more
coherent, recognisable and integrated way for regular, occasional and new users of the
network, including visitors. 
Strategy Theme 3: Enhancing public transport connectivity to / from: (i) Inverness; (ii) our sub-
regional centres; and (iii) Scotland’s other cities and beyond
Distance, topography, geography and low population density currently limit public transport connectivity
within much of the region. This Strategy Theme is focused on improving public transport connectivity for
journeys within, to and from the region through expanding the transport network, providing additional
connections and making journeys quicker.
Policy ST3a The RTS supports measures to reduce social exclusion for those without access to a
car.
Policy ST3b
The RTS recognises that the decline in bus passenger numbers in the region needs
to be reversed and supports measures to extend service coverage, improve
frequencies, lengthen the operating day and make the network more integrated.
Policy ST3c: The RTS supports measures to reduce bus journey times both between and within
settlements in the region, including through the provision of bus priority measures. 
Policy ST3d The RTS supports innovative alternatives to fixed route bus services where these
can be affordably provided.
Policy ST3e
The RTS recognises the role which community transport and Demand Responsive
Transport (DRT) plays in our most rural communities and supports its expansion and
integration with timetabled services.
Policy ST3f The RTS supports measures to widen the awareness and use of community
transport, DRT and EDRT amongst all members of society.
Policy ST3g The RTS recognises the role of taxis as a key element of transport provision in the
region where community transport, DRT and EDRT services are not provided.
Policy ST3h
The RTS recognises that rail journey times to, from and within the region are typically
longer than elsewhere in Scotland, and therefore supports measures to reduce these
journey times.
Policy ST3i
The RTS supports the commitment to electrify the Highland Mainline as an
opportunity to reduce rail journey times and improve reliability as part of the overall
decarbonisation of the network.
Policy ST3j
The RTS recognises that very low rail service frequency often makes rail uncompetitive
with the car and therefore supports measures which would facilitate increased rail
service frequency, particularly between Inverness and Aberdeen, Edinburgh and
Glasgow.
Policy ST3k The RTS promotes and supports the development of additional local rail services
focused on our regional centres.
Page 157

Page 158

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
13 
Strategy Theme 3: Enhancing public transport connectivity to / from: (i) Inverness; (ii) our sub-
regional centres; and (iii) Scotland’s other cities and beyond
Policy ST3l
The RTS supports infrastructure measures which would enable increased service
frequency, such as the electrification of the Highland Mainline, Aberdeen to Inverness
and improvements to the signalling system.
Policy ST3m
The RTS supports the planning and delivery of new railway stations, including
innovative solutions proportionate to the location, subject to the development of an
appropriate business case. 
Strategy Theme 4: Improving the integration, quality of and access to public and shared
transport
Addressing the barriers to travel by public transport, including interchange within and between modes,
physical barriers for those less able and poor-quality facilities and travel information
Policy ST4a
The RTS supports measures that will improve integration within and between modes
of transport at key locations and transport interchanges in order to provide new travel
options and alternatives to the private car, recognising the constraints within which this
is possible (e.g., delivering school bus services).
Policy ST4b The RTS supports integrated ticketing measures to simplify travel and improve the
passenger experience.
Policy ST4c:
The RTS supports the adoption of contract conditions for tendered and supported
services that encourage operators to work in partnership to improve integration,
timetable planning and coordination.
Policy ST4d The RTS supports the provision and enhancement of mobility hubs across the region,
in line with a hierarchy reflecting local requirements.
Policy ST4e The RTS supports measures which will enable people to leave their bicycle in a
secure environment at a bus stop / station, railway station, ferry terminal or airfield.
Policy ST4f The RTS supports, where practical, the provision of increased bicycle capacity on
public transport services within the region.
Policy ST4g The RTS supports the simplification of the process of taking a bicycle both to and onto
a bus or train. 
Policy ST4h The RTS supports more widespread journeys which combine bicycle and public
transport.
Policy ST4i The RTS supports the provision of consistent standards of facilities at bus stations
and bus stops reflecting location and usage.
Policy ST4j Our bus network should be safe, secure and fully accessible to all.
Policy ST4k Our bus network should provide a high-quality and consistent onboard experience.
Policy ST4l Travel on buses to, from and within the region should, where possible, enable
meaningful working time. 
Policy ST4m The RTS supports the provision of more consistent standards of facilities at railway
stations, reflecting station usage.
Policy ST4n Our railway network should be safe, secure and fully accessible to all.
Policy ST4o The RTS supports the continuation and expansion of the Scotland’s Railway Adoption
Programme and other measures to enhance the station environment.
Policy ST4p Our ferry network should be safe, secure and fully and easily accessible to all. This
includes both shore-to-vessel access and movement around the vessel itself.
Policy ST4q
The RTS recognises that there is not a short-term solution to the accessibility issues
with the Argyll and Bute and Orkney inter-island air services. We will keep abreast of
developments in technology and new aircraft types and, in the meantime, continue to
work with partners to support alternative options such as the Scottish Ambulance
Service. 
Page 158

Page 159

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
14 
Strategy Theme 4: Improving the integration, quality of and access to public and shared
transport
Policy ST4r The RTS supports sufficient provision and better enforcement of Blue Badge parking
across the region.
Policy ST4s
The RTS recognises the important role of taxis as part of the overall transport mix in the
region. It supports partnership working with licencing authorities and taxi providers to
raise standards of provision where required and to facilitate the expansion of the
network. 
Policy ST4t The RTS supports the provision of taxi services which are fully accessible in terms of
booking and vehicle access.
Policy ST4u
A key component of making travel accessible to all, the RTS supports measures to
remove barriers to travel, including increased staff training, passenger chaperones
and the provision of physical and online travel information in accessible formats.
Policy ST4v The RTS supports the maintenance and expansion of at-stop / at-station multi-modal
real-time information.
Policy ST4w The RTS promotes the simplification and consolidation of travel planning and in-
journey information to make travel easier for less frequent users.
Policy ST4x The RTS supports the further development of the GO-HI travel app.
Policy ST4y The RTS supports the provision of up-to-date physical travel information at bus stops,
and the removal of out-of-date information.
Policy ST4z
The RTS calls for improved cross-provider digital connectivity across the region to
facilitate access to travel information for all (including in-car information), enable
meaningful working time when travelling by public transport and to help reduce the need
to travel where possible. 
Strategy Theme 5: Providing connectivity that supports our island and peninsular
communities
Improving the connectivity and reducing the peripherality of island and peninsular communities through
improved ferry and air services, and potentially fixed links
Policy ST5a The RTS supports the provision of longer daily time on-mainland and on-island
where this is required for the long-term sustainability of a community.
Policy ST5b The RTS supports the provision of services which minimise the requirement for one or
more overnight stays.
Policy ST5c: Where practicable, the RTS supports the operation of additional sailings on the
supported ferry networks within the region.
Policy ST5d
The RTS supports year-round seven-day connections for island and peninsular
communities where this is required for the long-term sustainability of a community and
enjoys public support.
Policy ST5e The booking and ticketing arrangements for ferry services in the region should support
the convenience and efficiency of travel for all.
Policy ST5f The RTS calls for the earlier opening of ferry booking systems and increased
transparency around the release and management of vehicle deck space.
Policy ST5g
The RTS supports the principle of Road Equivalent Tariff (RET). However, where
service frequency permits, controlled use of peak times / surge pricing could be used to
help manage demand, recognising that this would need to be at no net detriment to the
connectivity of island and peninsular communities. 
Policy ST5h The RTS supports operational measures which maximise the efficient management of
vehicle deck space on sailings.
Policy ST5i
The RTS supports measures to improve door-to-door journeys through enhancing
active travel, public transport and shared mobility connections to and from ferry
terminals, combined with other measures to reduce the need to take a car onboard.
Page 159

Page 160

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
15 
Strategy Theme 5: Providing connectivity that supports our island and peninsular
communities
Policy ST5j
The RTS recognises the long-term underfunding of vessels and infrastructure in the
region and strongly calls for fleet and infrastructure modernisation to address issues
of reliability and resilience.
Policy ST5k
The RTS calls for the development of a regularly maintained Vessels and
Infrastructure Planning Pipeline across all publicly supported ferry networks in
Scotland.
Policy ST5l The RTS supports an increase in the overall fleet size and the inter-operability of that
fleet and supporting infrastructure to strengthen resilience.
Policy ST5m The RTS supports the principle of increasing capacity through frequency rather than
larger vessels.
Policy ST5n The RTS calls for an objective consideration of the design characteristics of future
vessels for all routes, including hull form and the provision of crew accommodation.
Policy ST5o
The RTS supports the introduction of new low or zero emissions vessels to replace
life-expired tonnage. This should be done in line with the NTS2 Sustainable Investment
Hierarchy.
Policy ST5p
With the vessel and infrastructure replacement cycle, the RTS supports measures to
reduce journey times for our island communities. This includes providing direct sailings
rather than via another island (where this is the preference of the local community) and
consideration of new ferry terminal locations that reduce crossing distances.
Policy ST5q The RTS supports harbour infrastructure improvements ahead of life expiry where this
could contribute to a material improvement in reliability.
Policy ST5r The RTS supports the conversion of the remaining Lo-Lo routes in the region to Ro-
Ro where there is community support.
Policy ST5s The RTS supports the further development of the Highlands and Islands’ air network.
Policy ST5t
The RTS supports the further development of commercial external routes, particularly
to London Heathrow and other international hub airports, that support the economic
competitiveness of the region.
Policy ST5u
The RTS supports the retention of the PSO air network within the region and, where
alternative travel choices are inadequate, its further expansion. ‘Adequate’ in this
context refers to the ability to achieve an affordable daily return to / from a national
centre.
Policy ST5v
The RTS supports the operation of additional connections and flights on the PSO air
networks within the region, whether delivered by existing, additional or new low
emission aircraft.
Policy ST5w The RTS supports more direct flights rather than via another island. 
Policy ST5x The RTS supports the adoption of technological and infrastructure solutions which
would improve the reliability and frequency of inter-island air services.
Policy ST5y
The RTS supports the principle of fixed links where they represent value for money and
are supported by the island or peninsular community. Any fixed link should be
implemented in conjunction with improved public transport connectivity and incorporate
provision for active travel.
Policy ST5z
The RTS supports the consideration of tolling where this would assist in making the
case for a fixed link. The use of vehicle number plate recognition technology could
allow local residents to travel for free. 
Page 160

Page 161

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
16 
Strategy Theme 6: Improving the efficiency of transport networks and supply-chains
and reducing their impact on our communities
Many supply-chains in the region are marginal and face challenges not found elsewhere in Scotland,
working around ferry connections for example. This Strategy Theme is focused on enhancing the
efficiency of supply-chains and identifying means for improving their environmental sustainability.
Policy ST6a The RTS supports the principle of new dedicated or high-capacity freight vessels on
freight intensive routes.
Policy ST6b The RTS supports the formalisation and extension of the carriage of unaccompanied
trailers to a wider range of routes.
Policy ST6c: The RTS supports the operation of dedicated freight sailings, either by contracted or
commercial operators where there is demand and it is operationally deliverable.
Policy ST6d
The RTS supports moves towards greater simplification and consistency in the setting of
ferry freight fares across the region, recognising that this would be achieved over the
medium-term.
Policy ST6e The RTS supports infrastructure measures which will enable the growth of rail freight
to and from the region.
Policy ST6f The RTS supports infrastructure investment and funding initiatives which will enable the
growth of waterborne and air freight to, from and within the region. 
Strategy Theme 7: Improving the safety, reliability and resilience of our road and rail
networks
Weather, geological instability and very limited diversion opportunities make resilience a key issue in the
region, whilst safety is a primary concern on many of the main road routes. This Strategy Theme is
therefore focused on improving the safety, reliability and resilience of transport networks within the
region.
Policy ST7a
The RTS restates our support for the full dualling of the A9 and A96, with early
prioritisation of the Elgin and Keith bypasses to dual carriageway standards, following
the already committed Inverness to Wester Hardmuir scheme.
Policy ST7b The RTS calls for incremental improvements to our road network where there are
safety, efficiency and environmental benefits, including in relation to single track roads.
Policy ST7c: The RTS supports the expansion of 50mph HGV speed limits across the Trunk Road
network in the region.
Policy ST7d
The RTS supports the provision of improved overtaking opportunities on our roads,
especially where there are known problems with vehicle platooning which can cause
driver frustration. 
Policy ST7e The RTS calls for investment in our regional road network where there are regular and
sustained periods of disruption due to weather and / or geological instability.
Policy ST7f
The RTS recognises the increasing vulnerability of our region’s road network to severe
weather events linked to climate change and supports capital and revenue measures
to mitigate this.
Policy ST7g
The RTS recognises the increasing vulnerability of the railway network to severe
weather events linked to climate change and supports capital and revenue measures
to mitigate this.
Policy ST7h
The RTS supports the continued provision and expansion of real-time travel
information for motorists and public transport users through existing and emerging
platforms.
Policy ST7i
The RTS recognises that many parts of our region’s road network are in poor condition.
It calls for enhanced preventative and remedial road maintenance to ensure the
safe, reliable and efficient movement of people and goods and the delivery of services
across our region. 
Page 161

Page 162

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
17 
Strategy Theme 7: Improving the safety, reliability and resilience of our road and rail
networks
Policy ST7j
Investment in our road network should continue to have an overarching focus on safety
with a view to reducing road traffic casualties in accordance with Scotland’s Road
Safety Framework to 2030.
Policy ST7k
To address risks which are particular to roads in our region, the RTS supports:
enhanced advisory signage; ongoing public information campaigns around the use of
single-track roads; provision of additional safe motorist services and HGV rest areas;
and information campaigns for visitors driving left-hand drive vehicles.
Policy ST7l The RTS specifically supports the improvement or removal of priority junctions on
higher speed trunk roads, especially for right-turning traffic.
Policy ST7m The RTS calls for increased provision of level boarding at stations across the region,
which will reduce station dwell times.
Policy ST7n
The RTS supports the provision of additional sections of double track (or static or
dynamic passing loops where double track does not represent value for money) to
improve punctuality.
Policy ST7o
The RTS supports infrastructure and timetable improvements external to the region
which will improve the reliability of services to / from Inverness, Fort William, Oban
and Mallaig. 
Strategy Theme 8: Facilitating sustainable visitor travel demand
Responding to the challenges arising from the significant seasonal influx of tourists to the region, often in
the areas least well-placed to accommodate it
Policy ST8a
The RTS supports the further development of long-distance walking, wheeling and
cycling routes (including the National Cycle Network), recognising the visitor, economic
and local benefits offered.
Policy ST8b The RTS supports the development of active travel connections to our ports, airports
and regionally important railway stations.
Policy ST8c: The RTS supports the development of active travel connections to our key tourism
destinations where this would be a realistic option for some visitors.
Policy ST8d
Where there are concentrations of international tourists, including cruise passengers,
the RTS supports the provision of enhanced local travel information and coordination to
improve visitor experience and reduce impacts on local networks.
Policy ST8e The RTS supports the operation and promotion of additional local rail services to key
tourism destinations.
Policy ST8f The RTS supports the provision of additional rail carriages on existing services in
peak season, where feasible.
Policy ST8g The RTS supports the principle of flexible timetabling where this can co-exist with
regular services for local residents.
Policy ST8h The RTS supports the principle of expanded open access rail services where these
can be accommodated at no disadvantage to scheduled services.
Policy ST8i The RTS supports the principle of sustainably accommodating visitor demand whilst
maintaining or increasing visitor numbers.
Policy ST8j
The RTS supports the introduction of additional parking restrictions and greater
enforcement of existing traffic orders at tourist honeypots as a tool to encourage
improved access to these locations by public transport or active modes and to address
indiscriminate and dangerous parking.
Policy ST8k
Where new or increased parking charges are introduced, this should be done in
combination with improved visitor facilities, including e.g., parking provision, public
toilets etc.
Page 162

Page 163

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
18 
Strategy Theme 8: Facilitating sustainable visitor travel demand
Policy ST8l
Whilst recognising the benefits of motorhome and campervan-based tourism in our
region, the RTS acknowledges that it can impact negatively on our communities at
certain times of the year. The RTS therefore supports measures to ensure that this
demand is sustainably accommodated.
Policy ST8m
Whilst recognising the benefits of cruise tourism in our region, the RTS recognises that
catering for this demand can negatively impact on our communities. The RTS therefore
supports measures to ensure that this demand is more sustainably accommodated.
Policy ST8n The RTS supports measures which would allow the benefits of cruise tourism to be
more evenly distributed around the region.
Policy ST8o The RTS supports the principle of bespoke bus services aimed at tourists to address
excessive car-based demand at honeypot locations.
Policy ST8p
The RTS recognises that high volumes of tourist traffic are impacting the condition of
some roads in our region and that increased central government funding is required
that reflects this increased pressure on local transport infrastructure, to support an
enhanced repair and maintenance programme.
Policy ST8q The RTS recognises that high volumes of tourist traffic can lead to slow and
inefficient journeys and therefore supports measures to address this. 
Strategy Theme 9: Decarbonising our transport, mitigating the effects of climate change
Supporting the decarbonisation of transport through the adoption of zero emission vehicles, vessels, and
aircraft
Policy ST9a
The RTS supports the implementation of measures which facilitate the decarbonisation
of the public transport vehicle fleet within the region, including commercial vehicles,
buses and community transport, rail rolling stock, aircraft and ferries.
Policy ST9b
The RTS recognises the opportunities brought about by the availability of renewable
energy in our region, including locally produced green hydrogen. The transport fleet mix
and associated infrastructure should reflect this.
Policy ST9c: The RTS supports the development of vehicle pooling and vehicle sharing services
across the region to reduce the need for personal car ownership.
Policy ST9d The RTS calls for the expansion of EV charging infrastructure to support the
decarbonisation of all vehicle based travel in our region.
Policy ST9e
The RTS recognises the challenges of distance, topography, climate and short winter
daylight hours to the rollout of battery electric powered commercial vehicles and seeks
low or zero emission solutions appropriate to our region, and which capitalise on
the surplus energy production within our region.
Policy ST9f The RTS supports the roll-out of other alternative fuels to promote the decarbonisation
of our transport networks, ports, ferry terminals, airports and airfields. 
Strategy Theme 10: Embracing new technologies
Capitalising on innovations in new technology
Policy ST10a The RTS embraces the opportunities provided by new technologies to improve the
provision of transport infrastructure and services across the region.
Policy ST10b The RTS supports consideration of the provision of future innovative personal
transport within the design of our active travel network and mobility hubs.
Policy ST10c: The RTS supports the principle and further development of Mobility-as-a-Service as
the technology evolves, particularly through our Go-HI app.
Policy ST10d
The RTS supports opportunities for the more widespread adoption of Connected and
Autonomous Vehicles and autonomous buses, whilst recognising the challenges
posed in our region.
Page 163

Page 164

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
19 
Strategy Theme 11: Reducing the cost of travel, particularly for those most in need
Improving the connectivity and reducing the peripherality of island and peninsular communities through
improved ferry and air services, and potentially fixed links
Policy ST11a
Transport poverty is a complex, dispersed and often hidden problem in our region.
The RTS commits to define and evidence this problem and identify appropriate actions
to be delivered by HITRANS and our partners. 
Policy ST11b
Recognising that, for many in our region (and especially those living in our island
communities), transport costs account for a high proportion of household income, the
RTS supports a reduction in public transport fares and the introduction of payment
plans for multi-journey tickets.
Policy ST11c:
The comparative costs of public transport mean that residents and visitors to the region
often choose to travel by car. The RTS therefore supports a reduction in the cost
differential between travelling by public transport and car.
Policy ST11d The RTS supports in principle the roll-out of Road Equivalent Tariff to any ferry routes
on which it does not currently apply, including local authority services.
Policy ST11e The RTS calls for greater cross-industry partnership working and regulatory reform to
reduce the cost penalty for interchange within or between modes of transport.  
Policy ST11f
The RTS calls for the extension of the National Concessionary Travel Scheme and
Under-22s Concessionary Travel Scheme to rail, ferry and air services where these are
the main or only mode of public transport in an area.
Policy ST11g The RTS calls for the retention and expansion of the Air Discount Scheme, including
to businesses in the region.   
Policy ST11h
National road pricing proposals may emerge in response to the reduction in fuel duty
and Value Added Tax as a result of the mass adoption of electric vehicles. If this
eventuality materialises, the RTS calls for a road pricing system that recognises the
unique characteristics of our region.
RTS Action Plan
Subsequent to the adoption of the RTS, an accompanying Action Plan will therefore be
developed. This will state the actions that we will take to progress the RTS and the timeframes
within which each action will be progressed. The Action Plan will contain a combination of
proposed appraisals / business cases, research studies, projects and programmes. It will
focus on actions that are regionally significant in nature - i.e., those which are large scale
or cross-boundary, either between authorities within our region or between our region and
other RTP areas. Local issues will be a matter for the Local Transport Strategies of our
constituent members. 
Unlike the RTS itself, which provides a circa 20-year strategic framework, the Action Plan will
be regularly reviewed and updated to reflect the changing status of projects, their differing
stages in the project lifecycle and the need for new or amended actions to support a policy
(e.g., in response to the emergence or development of new technology).
Governance
An early action upon adoption of our RTS that we would like to pursue is to undertake a
regional governance review, in partnership with our constituent local authorities Transport
Scotland and other key regional partners. This will build on our submissions to the Local
Governance Review and consider both how we deliver the RTS and how funding is allocated
to the region and disbursed. Once complete, we will submit our analysis to Scottish Ministers
for consideration and, subject to approval, seek to implement the recommendations over the
first RTS Action Plan period.
Page 164

Page 165

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
20 
1 Introduction 
1.1 Highlands and Islands Transport Partnership
1.1.1 The Transport (Scotland) Act 2005 created the framework for Regional Transport Partnerships
(RTPs), recognising the need for cross-boundary transport strategy, planning and delivery.
This was intended to address the long-running issue whereby, following the abolition of the
regional tier of government, there was a gap between national and local transport planning,
leading to inconsistencies and inefficiencies at the regional level. 
1.1.2 We, the Highlands and Islands Transport Partnership (HITRANS), are the statutory RTP for
much of the Highlands and Islands covering the council areas of Comhairle nan Eilean Siar,
Moray Council, Orkney Islands Council, The Highland Council and much of Argyll and Bute
Council (Helensburgh and Loch Lomond excepted, which are covered by Strathclyde
Partnership for Transport, SPT). A map of our region is shown below in which it is divided into
18 ‘travel-to-work areas’ (TTWAs) defined by the Office of National Statistics, together with the
main localities in the region in gradations from 500 persons upwards: 
Figure 1.1: Our geographic coverage – TTWAs and localities populations (Source: Office for National Statistics)
1.1.3 The concentration of the largest settlements around the Inner Moray Firth and the Cromarty
Firth is very clear from this graphic. However, even with this higher overall concentration, the
only localities with a (2020) population of greater than 10,000 are Inverness including
Culloden (63,730), Elgin (25,040) Fort William (10,260) and Nairn (10,190). Indeed, the
distances from major population centres of much of our region is one of its defining
features. Our region is also highly diverse, containing a mixture of islands, remote mainland,
rural and urban areas. It includes the fast-growing city of Inverness and other major
administrative centres such as Elgin and Oban, island ‘capitals’ such as Kirkwall and
Stornoway, larger islands with their own service centre (e.g., Mull) and remote islands with
populations of fewer than 100 people. 
Page 165

Page 166

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
21 
1.1.4 Our region is large, accounting for around half of Scotland's land mass. It includes long
indented coastlines as well as mountainous areas. It also has over 50 permanently inhabited
islands. These physical features act as barriers to the movement of people and goods. Routes
can be slow and / or circuitous, increasing the time and cost of travel.
1.1.5 Delivering a safe, efficient and reliable transport network requires partnership working and a
recognition of the unique challenges posed by geography, topography, weather and low
population density. Our role is to foster such partnership working, drawing together our
constituent members and other partners to develop, maintain and deliver a coherent transport
strategy for our region.
1.2 Our Regional Transport Strategy
1.2.1 The core function of Scotland’s seven RTPs is to produce a Regional Transport Strategy
(RTS). The guidance for the development of an RTS states, in summary, that the RTP must
seek to identify the present and future transport needs of the region, practical means of
addressing these needs, and set out how transport in the region will be provided, developed,
improved and operated so as to: promote safety; enhance social and economic well-being;
promote sustainability; conserve and enhance the environment; promote social inclusion and
equal opportunities; improve access to healthcare; and foster integration between modes and
with cross-boundary routes.
1.2.2 Our current RTS was first published in 2008 and was refreshed in 2018, although the
refresh was never formally adopted due to changes in the wider policy environment. The
Transport (Scotland) Act 2005 states that RTPs should keep their RTS under review and
modify or create a new one as necessary. In our view, several factors have combined to make
it the right time to produce a new RTS – these include:
 The publication of the new National Transport Strategy 2 (see Chapter 2) in 2020 has
refocused transport policy at the Scotland-level, and our RTS must align with this
 Alongside this, the Climate Change (Emissions Reduction Targets) (Scotland) Act
2019 has committed to the delivery of net zero emissions by 2045. In particular, the
Climate Change Plan Update published in December 2020 outlined that, by 2030: (i) our
roads will contain no new petrol or diesel cars or vans; and (ii) car kilometres will have
reduced by 20% (relative to 2019 base). In a region such as ours, where travel distances
are often long and public transport connectivity limited, it is necessary for our RTS to set
out how we can respond to these ambitious targets.
 Whilst our region is particularly vulnerable to climate change, climate mitigation
measures also present an important economic opportunity. Our region is rich in both
established and emerging renewable energy, including offshore and onshore wind,
pumped storage hydro and green hydrogen amongst others. It is essential that our
transport networks support the construction of renewable energy infrastructure in a
manner that does not negatively impact our communities, whilst also connecting labour to
the employment generated in both its construction and operation. A key opportunity in
this respect is the Inverness and Cromarty Firth Green Freeport, which aims to create
over 10,000 local jobs and generate over £3 billion in investment in the region.2
 The emergence of new technology is changing the way that we live and work. This will
have consequential impacts on travel both in terms of the journeys that we make (e.g.,
increased remote working and a reduction in business travel) and how these journeys
are made. 
 Our region has also changed significantly since the publication of the previous
RTS. Technological improvements, a major increase in remote working (particularly post-
2 https://greenfreeport.scot/green-freeport-forecasts-more-than-10000-new-jobs-and-3billion-investment-for-the-
highlands/ 
Page 166

Page 167

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
22 
COVID-19) and the evolution of policy have created new business opportunities and
promoted in-migration in some locations, whilst domestic and international tourism has
grown hugely over this period. This has delivered increased economic benefits overall,
but these trends have created new problems such as, for example, a shortage of labour
in certain areas and seasonal pressures for those communities most popular with visitors.  
 Whilst much has changed, we also continue to wrestle with many of the long-term
challenges which our region faces, including population decline in many parts of the
region, an ageing population and the difficulties and costs associated with delivering
services (particularly health, social care and education) to such a geographically
dispersed population. 
1.2.3 Recognising both the new and long-term transport challenges in our region, our new RTS
sets the strategic framework for the development of transport in our region over the
next 20 years, with the aim of delivering a transport system that reduces inequalities, takes
climate action, helps deliver inclusive economic growth, and improves health and wellbeing.
How have we approached the preparation of our new RTS?
1.2.4 Our new RTS has been prepared in accordance with the Transport Scotland RTS
development guidance (2006), the revised (2022) Scottish Transport Appraisal Guidance
(STAG) and all relevant legislative and policy requirements. The RTS itself marks the final
step in a three-stage process which involved the delivery of a:
 ‘Case for Change Report’, published in early 2023, which detailed the transport
problems that need to be considered in the RTS and which the RTS Strategy Objectives
which will underpin it.
 Preliminary Options Appraisal Report, produced in summer 2023, which generated,
developed, packaged and appraised options which could address the identified transport
problems.
1.2.5 The outputs from the ‘Case for Change’ and Preliminary Options Appraisal have been directly
incorporated into this RTS, as shown in the figure below: 
Figure 1.2: RTS development process and timeline
1.2.6 The preparation of our new RTS has also been informed by a multi-stage Strategic
Environmental Assessment (SEA), Equalities Impact Assessment (EqIA) and Island
Communities Impact Assessment (ICIA). These standalone and independent processes set
out how relevant environment, equalities and islands considerations were considered within
the RTS development process. SEA, EqIA and ICIA assessments of the Draft RTS
accompany this document.
Page 167

Page 168

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
23 
Structure of RTS
1.2.7 The remainder of our RTS is structured as follows:
 Chapter 2 establishes the policy and planning context within which our RTS has been
developed
 Chapter 3 summarises the main transport problems in our region, drawing on the RTS
‘Case for Change’ Report
 Chapter 4 sets out our RTS Vision, Strategy Objectives and Themes
 Chapters 5-15 describe each of the eleven RTS Themes in detail, setting out the policies
which we will be pursue over the lifetime of the RTS
 Chapter 16 outlines how we will deliver our RTS
 Chapter 17 outlines how we will monitor the performance of our RTS and evaluate its
success over its lifetime
Page 168

Page 169

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
24 
2 Policy and Planning Context
2.1 Overview
2.1.1 As a bridge between national and local transport policy, our RTS should align with the policy
priorities of national government but ensure that these are tailored to our regional and local
circumstances. Indeed, as alluded to in Chapter 1, the recent evolution of the policy context
has been a principal driver of our decision to develop a new RTS (see Section 2.2).
2.1.2 Allied to the evolving policy environment is the need to ensure that our new RTS reflects the
unique demographic, spatial and socio-economic characteristics of our region (i.e., the
planning context) (see Sections 2.3 and 2.4 and ‘Case for Change’ for detail).
2.2 Policy context
National policy context
2.2.1 Our new RTS must therefore reflect the prevailing national policy context, most notably
National Transport Strategy 2 (NTS2). The NTS2 was published in February 2020 and set
the following ‘Vision’ for Scotland’s transport system over the 20-year period to 2040:
“We will have a sustainable, inclusive, safe and accessible transport system, helping deliver a
healthier, fairer and more prosperous Scotland for communities, businesses and visitors.”
2.2.2 The NTS2 Vision is underpinned by four ‘priorities’, which are shown in the figure below: 
Figure 2.1: NTS2 priorities
2.2.3 The NTS2 also established two hierarchies which define how transport investment decision
making and services should be planned. These are the Sustainable Travel Hierarchy and
Sustainable Investment Hierarchy and are summarised in the figure below:
Page 169

Page 170

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
25 
Figure 2.2: NTS2 Sustainable Travel Hierarchy and Sustainable Investment Hierarchy
2.2.4 Two key points emerge in relation to our RTS:   
 In accordance with the NTS2 Sustainable Travel Hierarchy, the RTS themes and their
inherent policies should prioritise active travel and accessible public transport
connections whilst at the same time discouraging short, single car occupant
journeys
 The NTS2 Sustainable Investment Hierarchy dictates that investment in new
infrastructure should only be considered once a wider package of options to reduce the
need to travel, reduce the need to travel unsustainably, optimise use of existing
infrastructure and influence travel behaviour or manage demand have been explored
2.2.5 The approach adopted in the NTS2 is focused on delivering Scotland’s legal commitment to
deliver net zero greenhouse gas emissions by 2045, but in a manner that reduces
inequalities, improves public health and supports a strong and resilient economy. The
commitment to net zero allied with NTS2 has in turn generated a number of policies and
associated strategies which our RTS must take cognisance of, including:
 The recommendations of the Strategic Transport Projects Review 2 (STPR2), which is
the ‘delivery plan’ for NTS2 with respect to nationally funded strategic infrastructure. Of
relevance to our region is the desire to increase active travel provision, reduce the
movement of freight on roads and redesign travel to some island communities. 
 The policy to reduce car kilometres by 20% by 2030. Regional targets have not yet
been set but there is an acknowledgement that urban and rural targets and approaches
may vary.
 The adopted National Planning Framework 4 (NPF4) sets out plans to increase
connectivity through the development of new 20-minute neighbourhoods and
improvement of strategic connections between all modes of transport, adhering to
the ‘Place Principle’3 as far as possible
 Our region covers most of Scotland’s islands and our RTS will therefore reflect and,
where appropriate, challenge the National Islands Plan and provide inputs to future
iterations of this Plan
2.2.6 Our RTS will act as a bridge between national and local transport and land-use planning
policy. Of particular importance in this respect will be ensuring that the RTS provides a 
3 The ‘Place Principle’ requires that all those responsible for providing services and looking after assets in a place
need to work and plan together, and with local communities, to improve the lives of people, support inclusive and
sustainable economic growth and create more successful places.  National Planning Framework 4 (Scottish
Government, 2022), p. 154.  
Page 170

Page 171

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
26 
framework for and contributes positively to the Local Transport Strategies and Local
Development Plans produced by our constituent members.
2.3 The demographic and spatial characteristics of our region
2.3.1 As outlined in the introductory chapter, our region is unique within the UK, with long
distances from major population centres being one of its defining features for many. However,
it is also diverse, containing a mixture of island, remote mainland, rural and urban areas. 
2.3.2 For context, the figure below shows the distribution of population across our constituent local
authorities in 2021.4 
Figure 2.3: HITRANS local authorities’ populations (Source: NRS mid-year population estimates)
2.3.3 The estimated total population of the region in 2021 was 440,750 (8% of the Scottish total -
living in approaching half of the Scottish landmass), 54% of whom lived in The Highland
Council area. Some 11% of our residents live in the island groups of the Outer Hebrides (Na
H-Eileanan) and Orkney. Population is heavily concentrated in the Inverness and Elgin
TTWAs (introduced in Figure 1.1), which account for over 50% of the total population of the
region. All other TTWAs have populations of around 20,000 or less.
2.3.4 Chapter 2 of the ‘Case for Change’ Report provides an extensive commentary on the
demographic and spatial characteristics of our region - key demographic and spatial
considerations can be summarised as follows:
 Our region has a higher proportion of older age groups and a lower proportion of
working age adults compared to Scotland as a whole. This is though typical of rural
Scotland and implies a greater demand for access to health and care services in
particular. There are areas within the region where this is particularly pronounced, such
as the ‘Dunoon and Rothesay’ and ‘Golspie and Brora’ TTWAs.
 Highland, Moray and mainland Orkney saw significant in-migration in the decade prior to
the COVID-19 pandemic, a trend which accelerated with changing working patterns post-
pandemic (although the permanence of this effect remains to be established). Transport
connections are likely to be a factor in determining the future pattern of in-migration
and will be important in retaining those moving into our region in the longer-term. 
4 Estimate of HITRANS part of Argyll and Bute (70%) 
Argyll and
Bute, 60,110
Highland,
235,830
Moray, 95,820
Na h-Eileanan
Siar, 26,720
Orkney Islands,
22,270
Page 171

Page 172

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
27 
 The population of our region is projected to decline in the medium-term, with fewer
young and working-age people, and more people of pensionable age. This will increase
the need to access health and social care services and also generate labour market
issues, potentially with insufficient workers to fill posts in certain areas. The geography
of our region largely precludes ‘in commuting’ to fill these posts in some areas. The
provision of improved connectivity within and to / from our region will be important in
retaining young people and attracting in-migrants.
 Over half of our region’s population is classed by Scottish Government as ‘remote’
or ‘very remote’ whilst around a quarter live in larger settlements (10,000+). Our region
is therefore very diverse and our RTS needs to address the needs of some of Scotland’s
most geographically remote communities through to those living in the city of Inverness.
 Inverness is the primary employment, retail and service centre for much of our
region, albeit there are several regionally important service centres such as
Lochgilphead, Kirkwall, Elgin and Stornoway. 
2.4 The socio-economic characteristics of our region
2.4.1 Geography is again a defining factor in shaping the economy of our region – key socio-
economic characteristics can be summarised as follows (and are detailed at length in the
‘Case for Change’ Report): 
 Reflecting the rural nature of much of our region, car ownership rates are higher than
the Scotland average. This implies a high degree of car dependence for many and the
requirement to own and run a car (‘forced’ car ownership) will undoubtedly have a
significant negative impact on some households’ finances. Moreover, some households
will require a second car if the primary car is away from the property for most or all of
some days, given the absence of alternatives in many places.
 Despite its size, our region is home to less than 10% of Scotland’s population. Many
businesses therefore have a strong outward focus, selling goods and services
externally, ranging from whisky to textiles. Moreover, our region is rich in natural
resources such as timber and has a significant primary sector, particularly agriculture,
forestry and fishing. This means that transport links with other parts of Scotland and
beyond are as important as those within the region itself. Moreover, our region
experiences high volumes of inbound domestic and international seasonal tourism
travel, particularly post-COVID-19.
 Our region sees less in the way of extremes of wealth and deprivation than other
parts of Scotland. Nevertheless, there are areas with pockets of multiple deprivation
in Dunoon, Rothesay, Alness, Balintore, Inverness, Oban and Wick. Deprivation in rural
areas is also more dispersed compared to urban areas and frequently ‘hidden’, in that
standard indices often do not fully capture the impact of the higher cost of living and
geographic isolation on these communities. 
 Large parts of rural HITRANS have some of the highest rates of second home
ownership in the country. As well as sometimes being an issue for local communities,
these houses are likely to generate many mostly car-based trips to and from the area
either through the owners’ use or as holiday lets. Car-based tourism is a major
contributor to traffic in our region.
 Even prior to the pandemic, working from home was more common in our region
compared to the rest of the country. The travel-to-work areas generally show high
degrees of self-containment. Inverness is the focus of in-commuting, with nearly 12,000
living outside the area and travelling to work there. 
 Providing access to healthcare is already a key issue in our region and will become
increasingly important as the population profile is projected to age and there is a trend
towards service centralisation. This is an issue across many communities in the region
Page 172

Page 173

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
28 
(even in large settlements such as Wick) but those in some island and very remote
mainland locations face particular difficulties. 
Page 173

Page 174

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
29 
3 Transport problems in our region
3.1 Overview
3.1.1 This chapter briefly profiles the transport network in our region and key recent trends. It
thereafter summarises the transport problems experienced in our region, which are the
building blocks of our new RTS. The transport network and services are profiled in Chapter 4
of the ‘Case for Change’ Report, where additional detail can be found.
3.2 Transport networks in our region
3.2.1 Our region is unique in the UK in terms of its mix and extent of transport services, ranging
from small community operated passenger only ferries and single pilot aircraft through to inter-
city rail connections and trunk roads. The two maps which follow show the primary road and
rail networks, in both cases also showing ferry connections and airports / airfields5. 
5 Note that there is some overlap on the Orkney inter-island air service airfields due to the scale of the map.  In
summary, there are six island airfields – Eday, North Ronaldsay, Papa Westray, Sanday, Stronsay and Westray.
Page 174

Page 175

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
30 
Figure 3.1: HITRANS region road network, ferry connections and airports / airfields 
6 Includes heritage lines 
Figure 3.2: HITRANS region railway network6, ferry connections and airports / airfields 
Page 175

Page 176

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
31 
3.3 Recent trends
3.3.1 The chart below provides an overview of travel volumes by mode in the decade prior to the
COVID-19 pandemic and the years since, all indexed to 2019 for comparative purposes.7 
Figure 3.3: Trend in travel by mode in the HITRANS region (2019=100)
3.3.2 The first few years after 2009 saw the aftermath of the financial crash and associated UK
recession which explains the dip in most travel. From 2013, road traffic grew steadily until
2019, the last full year prior to the pandemic. Bus travel fell throughout this period though and
was 20% below its 2009 level in 2019. As is common for most trend-based analysis in our
region, there is significant variation between and within local authorities. For example, bus
patronage in the Orkney Islands has increased slightly over the same period despite the
overall decline across our region. 
3.3.3 After air travel, car-based ferry travel grew the most over this period at 18%. It is notable that
the growth in car carryings significantly outpaced the growth in passenger carryings at 6%.
Much of this is down to the introduction of Road Equivalent Tariff (RET) across the Clyde and
Hebrides Ferry Services (CHFS) network. In air travel, passenger numbers at Inverness
Airport grew rapidly by 61% between 2009 and 2019.
3.3.4 The pandemic of course had a major impact on travel and this is easily seen in the graph. In
2020, road traffic reduced by 22%, public transport (affected by both lockdowns and social
distancing policies / concerns over infection) saw bus travel reducing by 66% and train by
93%. Ferry travel was less affected than bus and rail reflecting the ‘lifeline’8 nature of much of 
7 Road traffic – Vehicle kms in HITRANS local authorities, including all of Argyll and Bute (Scottish Transport
Statistics, STS); Bus passengers – Eilean Siar, Highland, Moray, Orkney Islands, Shetland Islands, Argyll & Bute
(STS); Rail passengers – ORR Station data (all stations in HITRANS area); Ferry – Argyll and Bute services,
CalMac, Highland Council services, Orkney Ferries, NorthLink (excluding Shetland), Western Ferries (STS); Air –
terminal passengers at Barra, Benbecula, Campbeltown, Inverness, Islay, Kirkwall, Stornoway, Sumburgh, Tiree,
Wick John O'Groats (STS)
8 ‘Lifeline’ transport infrastructure is often a single route that connects a community with key destinations. These
are ones that need to be accessed for health, employment, education, shopping and leisure; plus services 
20
30
40
50
60
70
80
90
100
110
120
130
140
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
2019 =
100
Road traffic Bus passengers Rail passengers
Ferry - passengers Ferry - cars Airports passengers
Page 176

Page 177

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
32 
this travel, with much of the reduction being attributable to reduced visitor / tourist travel,
particularly at Easter and at least the early part of the summer holidays. 
3.3.5 By 2022, when all COVID-19 restrictions were being lifted in the early part of the year, rail
passenger numbers were 83% of pre-pandemic levels, bus passenger numbers 71% and road
traffic had fully recovered (although car traffic is down somewhat with commercial vehicle
traffic now above pre-pandemic levels). Ferry tarvel was around 90% of 2019 levels with air
travel at 75%. The long-term impact of the pandemic on travel is therefore still being keenly
felt and post-pandemic reductions in public transport services have the potential to particularly
impact on groups with protected characteristics.9 
3.3.6 The Scottish Household Survey (SHS) publishes a range of statistics about travel in Scotland,
some of which are disaggregated by RTP area. Analysis of recent trends (between 2012/13 to
2019 (pre-pandemic)) for our region shows:
 Commuting to work: an increase in car use and active travel, and a reduction in public
transport usage
 Place of work: an increase in working from home
 Travel to school: a reduction in walking and bus use and an increase in car-based travel
 Main mode of travel: an increase in car use and a reduction across all other modes
 Car availability: an increase in the proportion of households with two or more cars and a
reduction in zero-car households
 Car use: an increase in car use and driving licence holding
 Bicycles: a small increase in rates of bicycle ownership
 Walking: a reduction in walking as a means of transport but an increase in walking for
leisure
 Use of buses and trains: a reduction in bus and train use 
 Satisfaction with public transport: a reduction in levels of satisfaction with public
transport
 Concessionary fares: an increase in the proportion of people with a National Entitlement
Card but some reduction in usage amongst holders
 Distance travelled: an increase in the distance travelled per person
3.3.7 It is therefore clear that the majority of these indicators in our region are going in the
‘wrong’ direction from a policy (and equalities) perspective, albeit there will again be
variation across the region. This clearly presents a range of challenges which the RTS will
seek to address.
3.4 Summary of transport problems in our region
3.4.1 The ‘Case for Change’ sets out at some length the transport problems in our region – these
can be summarised as follows:
 Journey times for trips between settlements within our region and to / from our region to
elsewhere in Scotland are long and characterised in places by low average speeds.
This is true of road, rail and bus and impacts on the productivity and economic
competitiveness of our region. 
provided by those based elsewhere and the movement of freight. If a lifeline route is unavailable, that community
will often be cut off, or in some cases face a long diversionary route.
9 As defined by the Equality Act 2010
Page 177

Page 178

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
33 
 Journey time reliability by road is also relatively poor, affected by vehicle platooning,
inclement weather, poor network resilience when incidents occur and limited daylight
hours in winter. This is a particular issue for road freight, which is sometimes moving
high-value and time sensitive products to end customers or forwarding depots, which
makes journey time reliability essential.
 Reliability more generally is becoming a major issue on almost all ferry networks in our
region, with ageing vessels and port infrastructure breaking down more frequently.
These issues compound the underlying reliability challenges caused by inclement
weather.
 Public transport frequency is also generally very low outwith the larger settlements
and, in most cases, operates over a shorter day than would be found elsewhere in
Scotland. This acts to limit access to opportunities and can lead to the need for
expensive overnight stays, particularly for those travelling from and to our island
communities. Even in Inverness, the first direct trains of the day from the Central Belt do
not arrive until late morning / early afternoon (10:28 from Glasgow Queen Street and
12:01 from Edinburgh Waverley). 
 The long travel distances, and in some cases the need to combine an overland trip
with a ferry or air service, makes travel in our region more expensive than elsewhere
in Scotland. For ferry travel, this is compounded by differential tariff structures
(passenger, car and freight) between networks and even on some islands within the
same network. 
 Some roads within our region also suffer from a poor road safety record and in particular
a high proportion of fatal personal injury collisions. Even on trunk and major A-roads, the
network is almost exclusively single carriageway or single track, often over difficult
terrain with few overtaking opportunities and limited lighting. Several major roads such
as the trunk A96 Inverness – Aberdeen and A82 Inverness – Glasgow via Fort William
also run through numerous settlements along their route, making walking, wheeling
and cycling in these settlements less safe and attractive.  
 Transport resilience is also a major issue in our region, more so than anywhere else in
the UK. The road and railway networks are subject to extremes of weather (e.g.,
snow, flooding etc) and geological instability in some locations. In the event of road
closures, with few alternative routes, this can lead to very long diversions and can have
major negative impacts on the emergency services (e.g., if an ambulance or fire
appliance is located on the ‘wrong side’ of an accident) and in terms of service delivery,
such as social care, district nursing etc. The ferry networks around our region are also
generally operated on fine margins, with few spare vessels to cover for increasingly
frequent breakdowns, particularly during refit / drydock periods, which themselves are
becoming longer. 
 With Inverness acting as our major regional centre to a widely dispersed hinterland,
this generates significant vehicle kilometres and a demand for parking in the city.
Moreover, for those travelling from the remotest settlements, public transport journey
times are long and services can be infrequent and expensive, particularly given fuel price
differentials in more remote areas. Allied to this, many people have to travel increasing
distances to access key services as a result of the centralisation of provision of
facilities, branches e.g., banking, post offices but most evidently healthcare.
 Many of the settlements in our region are rural, and our region includes some of
Scotland’s most remote communities. The impact of this is fourfold: (i) labour markets
are limited in size and in most cases largely self-contained within discrete travel-to-work
areas – this can lead to labour shortages and challenges in matching skills to jobs;
(ii) there is a reliance on the transport network to connect people to services (e.g.,
retail) and vice versa (e.g., social care), but the limitations of the network make such
journeys long and expensive; (iii) very low travel volumes make the delivery of transport
services expensive and, with respect to bus services, subject to short notice
Page 178

Page 179

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
34 
reduction and withdrawal; and (iv) the scope for active travel journeys between
settlements is limited.
 Connected to the above point is the issue of transport poverty, where low service
frequency and / or short operating days can act to limit the ability to access essential
services. Indeed, in some parts of our region, there are no scheduled public transport
services at all, leading to ‘forced car ownership’. This can be a ‘push’ factor in out-
migration in communities which are already fragile.
 The above challenges are compounded by the extreme winter-summer differentials in
travel in Argyll and the Highlands and Islands. In the summer months, the network
has to accommodate day-trippers, staying visitors, motorhomes and cruise passengers,
whilst traffic has to be managed at ‘honeypot’ locations such as Skara Brae in Orkney. A
particular feature of tourism in our region is that much of it is drawn towards where the
transport infrastructure is least well-placed to support it, e.g., the North Coast 500; the
islands, where visitors can consume a significant amount of ferry vehicle capacity; and
‘honeypot’ locations such as Glenfinnan and the Fairy Pools on Skye. This can lead to
deteriorating road conditions and the need for increased maintenance.
 A consequence of low population density and public transport frequency is that our region
derives a proportionally lower benefit from national policies and funding streams, e.g.,
the National Concessionary Travel Scheme – this is a clear inequality. Moreover, there
are inequalities between areas within our region associated with anomalies in historic
funding and delivery arrangements, the existence of which have little evidential basis. For
example, all ferry services in the CHFS network are entirely funded by the Scottish
Government, whereas the additional cost of local authority funded ferry services over and
above the Grant Aided Expenditure (GAE) settlement from the Scottish Government must
be met by local authorities from their own resources (although there are examples of
additional government ‘top-up’ funding being provided).
 The very different nature of the supply of and demand for transport in our region also
raises a question as to how national government policy aspirations should be
delivered. For example, for many essential journeys, there is no realistic alternative but
to use the private car, which presents a challenge in terms of delivering the 2045 net zero
commitment and the proposed 20% reduction in vehicle kilometres by 2030. 
3.4.2 Despite these transport challenges, our region is in many respects thriving like never before.
Headline long-term population decline has been checked although this is still an issue in many
communities and forecast population loss and ageing remains an issue. There are significant
concentrations in growth industries from traditional staples such as, food and drink and
tourism to renewables and spaceports. Improved connectivity is providing the opportunity for
more people to reduce travel by working from home and enable creative industries to locate
within the region; and our region is also at the forefront of piloting renewable fuels, the use of
hydrogen fuel cells on the Orkney Ferries’ vessel MV Shapinsay for example. Continued
development and growth are however dependent on the provision of fast, reliable, safe and
resilient transport connections between communities in our region and between our
region and elsewhere in Scotland. Supporting the delivery of these connections is the focus
of our RTS.  
Page 179

Page 180

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
35 
4 Our Vision and RTS Strategy Objectives
4.1 Our RTS Vision
4.1.1 Our RTS Vision is an expression of the type of region that we want the Highlands and Islands
and Argyll to be and how transport can contribute to achieving that for everyone. It has been
developed to reflect national policy and legislation, most notably the commitment to net zero
greenhouse gas emissions by 2045, but at the same time reflects the very distinctive
character of our region. The Vision provides an overarching context within which our RTS
Strategy Objectives can sit and provides a long-term focus for HITRANS and our constituent
members.
Our transport networks and services will act to realise the economic potential of our
region through reducing the actual and perceived impacts of distance, poor
resilience and low population density. By doing this, they will facilitate economically
and socially valuable activities for all, provide equality of opportunity, enable people
to live active and healthy lives and allow our region to contribute fully to the national
net zero emissions target.
4.2 Our RTS Strategy Objectives
4.2.1 The RTS Strategy Objectives: (i) provide the bridge between the transport problems in our
region and the outcomes that we are seeking through our RTS; and (ii) express how our RTS
Vision will be realised. To ensure that the process of setting RTS Strategy Objectives was
both systematic and rigorous, a seven-step bottom-up approach was adopted, as summarised
in the figure below: 
Figure 4.1: RTS Strategic Objectives development process
4.2.2 A description of each individual step in this process is provided in the ‘Case for Change’
Report. However, we briefly reflect on the ‘Transport Problems Framework’ (Step 1), as this is
the foundation on which our RTS was built. 
Step 1: Establish and
populate a transport
problems framework by
mode
Step 2: Set out resulting
problems and the supply
side root causes in each
case
Step 3: Set out travel
behaviour consequences
of transport problem
Step 4: Set out societal
consequences of travel
behaviour consequences
Step 5: Define a transport
planning objective for
each transport problem
Step 6: Define a set of
strategy objectives
reflecting these transport
planning objectives
Step 7: Map Strategy
Objectives to National
Transport Strategy 2
'priorities'
Page 180

Page 181

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
36 
Transport Problems Framework
4.2.3 Given the geographic, socio-economic, demographic and modal diversity of our region, it was
essential that the approach to setting the RTS Strategy Objectives was rigorous and
systematic. To this end, we developed and populated a ‘Transport Problems Framework’ at
the ‘Case for Change’ stage. This defined a transport problem as being a problem
experienced by a user, or potential user of the transport network in our region. These
transport problems can be thought of as one or more of:
 Something that negatively affects a journey which is still made (people and freight) by
that mode of travel – in the main this makes a trip less efficient, more expensive, less
comfortable or more stressful in terms of safety and / or wellbeing.
 Something that stops people or goods travelling by (generally) more sustainable
and policy friendly modes – this primarily leads to more car use and associated
negative impacts across a range of policy areas including environment, climate change
and safety.
 Something that stops people making the trips they would like to make, or goods
being moved – impacting on peoples’ life chances, wellbeing, and business
opportunities.
4.2.4 Transport problems, when defined in this way, are typically associated with a relatively narrow
range of parameters which define any trip or travel, and these are set out in the table below.
Table 4.1: Transport problem ‘themes’
All Modes of Travel Public transport specific 
Concern over environmental impact of travel Booking and journey planning (e.g., making
connections between services)
Cost of travel and affordability Capacity – seating / ferry car deck and sleeping
accommodation
Fuel / power issues Comfort, safety and security 
Integration of travel between modes Connectivity and network coverage (availability of
services)
Journey information, including for protected
groups who may find accessing information
particularly difficult
Ease of use / convenience
Journey quality
Integration between services (within mode, e.g.,
bus-to-bus and between modes, e.g., ferry-to-
train, active travel to bus etc), including for people
with disabilities or other protected characteristics
which affect accessibility
Journey times Service reliability (cancellations and punctuality) 
Journey time reliability (including public transport
service punctuality)
Timetables (first and last / frequency / days of the
week etc.) and their accessibility for all groups
Lack of awareness of travel options 
Personal accessibility – being able to access
transport networks and public transport services
specifically including people with disabilities or
other protected characteristics which affect
accessibility 
Personal security (fear of crime) 
Travel safety (collisions, personal injury) 
Page 181

Page 182

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
37 
4.2.5 The above list was used as a ‘checklist’ to develop a set of transport problems for each mode
of transport in the context our region, drawing in the evidence developed for and presented in
the ‘Case for Change’. 
RTS Strategy Objectives
4.2.6 The RTS Strategy Objectives define the outcomes that we are trying to achieve through the
RTS. Emerging from ‘Step 6’ of the above referenced process, they are an aggregation of
individual Transport Planning Objectives set in relation to each transport problem identified in
the Transport Problems Framework. The Strategy Objectives are therefore:
Strategy Objective 1: To make a just transition to a post-carbon and more
environmentally sustainable transport network.
4.2.7 Why? – Scotland has a target to achieve net zero carbon emissions of all greenhouse gases
by 2045 and transport is a key sector in terms of such emissions. Our transport networks and
services must adapt to fulfil this target in a fair and equitable way whilst also being developed
in as environmentally sustainable a way as possible. The process must also recognise the
needs of all groups through a ‘Just Transition’.
Strategy Objective 2: To transform and provide safe and accessible connections
between and within our city, towns and villages, to enable walking, wheeling and
cycling for all.
4.2.8 Why? – to allow everyone to walk, wheel and cycle more, leading to more local living patterns,
greater inclusion, affordable transport, healthier lifestyles, and reduced car use – the latter
leading to reduced emissions / noise etc and improved road safety.
Strategy Objective 3: To widen access to public and shared transport and improve
connectivity within and from / to the region.
4.2.9 Why? – to give people new travel choices, allowing them to: (i) use accessible and affordable
public or shared transport options to make journeys they previously could not make; or (ii) to
use public or shared transport instead of the car - this leading to lower levels of car use and
reduced emissions / noise etc., as well as improved road safety. This objective is also
important in encouraging inclusive economic growth by widening labour markets and providing
improved accessibility to employment opportunities by public transport.
Strategy Objective 4: To improve the quality and integration of public and shared
transport within and from / to the region.
4.2.10 Why? – to make public and shared transport more attractive and competitive with car-based
travel and to ensure the accessibility needs of all groups are accommodated. This will improve
the travel experience for existing public transport users and encourage people to use public or
shared transport instead of the car, leading to lower levels of car use and reduced emissions /
noise etc, improved road safety and will support the social benefits associated with shared
transport.
Strategy Objective 5: To ensure reliable, resilient, affordable and sustainable
connectivity for all from / to our island, peninsular and remote communities.
4.2.11 Why? – some of our island and peninsular communities have suffered from pronounced
connectivity difficulties in recent years. This has had wide-ranging impacts on these
communities and this objective recognises the need to tackle this issue, in tandem with
Strategy Objective 4. Delivering this objective will provide the foundation for the long-term
sustainability and success of these vulnerable communities, including through helping meet
Page 182

Page 183

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
38 
the needs of people with protected characteristics and by tackling socio-economic
disadvantage. 
Strategy Objective 6: To improve the efficiency, safety and resilience of our transport
networks for people and freight and adapt to the impacts of climate change.
4.2.12 Why? – our transport systems must be safe and able to adapt to changing demands (e.g.,
tourism patterns, trade etc) and be resilient in the face of climate change. This objective is
important in allowing the society and economy of our region to prosper and to reduce
inequalities of outcome associated with socio-economic disadvantage. 
Alignment of our Strategy Objectives with NTS2
4.2.13 As our new RTS reflects national transport policy, it is important to ensure alignment between
our RTS Strategy Objectives and the NTS2. The table below therefore maps the RTS Strategy
Objectives to the four NTS2 Priorities:
Table 4.2: Map of Strategy Objectives to NTS2 priorities 
NTS2 Priorities
Strategy Objective Reduces
inequalities
Takes
climate
action
Helps
deliver
inclusive
economic
growth
Improves
our health
and
wellbeing
1: To make a just transition to a post-carbon
and more environmentally sustainable
transport network.
   
2. To transform and provide safe and
accessible connections between and within
our city, towns and villages to enable
walking, wheeling and cycling for all
   
3. To widen access to public and shared
transport and improve connectivity within
and from / to the region
   
4. To improve the quality and integration of
public and shared transport within and from
/ to the region
   
5. To ensure reliable, resilient, affordable
and sustainable connectivity for all from / to
our island, peninsular and remote
communities
   
6. To improve the efficiency, safety and
resilience of our transport networks for
people and freight, and adapt to the impacts
of climate change 
  
4.2.14 As can be seen from the above table, there is clear alignment between our RTS Strategy
Objectives and national transport policy, as expressed in the NTS2.
4.3 RTS Themes
4.3.1 Following the completion of the Preliminary Options Appraisal, the shortlisted options were
aggregated into 11 Strategy Themes, which are summarised in the table below:
Page 183

Page 184

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
39 
Table 4.3: RTS Strategy Themes
Theme Description
1
Transforming our communities
and reducing the impact of
transport upon them
Improving the public realm and mobility within settlements by
reducing the dominance of the private car and maximising
opportunities for walking, wheeling and cycling.
2 Connecting our communities Facilitating walking, wheeling and cycling within settlements and
improving active travel connections between them.
3
Enhancing public transport
connectivity to / from: (i)
Inverness; (ii) our sub-regional
centres; and (iii) Scotland’s
other cities and beyond
Distance, topography, geography and low population density
currently limit public transport connectivity within much of the
region. This Strategy Theme is focused on improving public
transport connectivity for journeys within, to and from the region.
Widening the network, providing more connections, making
journeys quicker
4
Improving the integration,
quality of and access to public
and shared transport
Addressing the barriers to travel by public transport, including
interchange within and between modes, physical barriers for
those less able and poor-quality facilities and travel information.
5
Providing connectivity that
supports our island and
peninsular communities
Improving the connectivity and reducing the peripherality of island
and peninsular communities through improved ferry and air
services, and potentially fixed links.
6
Improving the efficiency of
transport networks and supply-
chains and reducing their
impact on our communities
Many supply-chains in the region are marginal and face
challenges not found elsewhere in Scotland, working around ferry
connections for example. This Strategy Theme is focused on
enhancing the efficiency of supply-chains and identifying means
for improving their environmental sustainability.
7
Improving the safety, reliability
and resilience of our road and
rail networks
Weather, geological instability and very limited diversion
opportunities make resilience a key issue in the region, whilst
safety is a primary concern on many of the main road routes. This
Strategy Theme is therefore focused on improving the safety,
reliability and resilience of transport networks within the region.
8 Facilitating sustainable visitor
travel demand
Responding to the challenges arising from the significant
seasonal influx of tourists to the region, often in the areas least
well-placed to accommodate it.
9
Decarbonising our transport,
mitigating the effects of
climate change
Supporting the decarbonisation of transport through the adoption
of zero emission vehicles, vessels, and aircraft.
10 Embracing new technologies Capitalising on innovations in new technology.
11
Reducing the cost of travel,
particularly for those most in
need
Reducing the cost of travel for residents of the region, which is a
primary contributor to ‘transport poverty’
4.3.2 The RTS Themes have been used to shape the content of the RTS, with each subsequent
chapter of this document focusing on a separate theme and relevant policies therein. The
table below maps the RTS Themes to the Strategy Objectives. As is evident from the table,
the RTS Strategy Themes are well-aligned to our RTS Strategy Objectives and thus form a
robust basis for our RTS.
Page 184

Page 185

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
40 
Table 4.4: Mapping of RTS Themes to Strategy Objectives
Strategy Theme
SO1: To make a just transition to a post-
carbon and more environmentally
sustainable transport network
SO2: To transform
and provide safe and
accessible connections between and within
our city, towns and villages, to enable
walking, wheeling and cycling for all
SO3: To widen access to public and shared
transport and improve connectivity within
and
to / from
the region
SO4: To improve the quality and integration
of public and shared transport within and
from
/ to the region
SO5: To ensure reliable, resilient,
affordable and sustainable connectivity for
all from
/ to our island, peninsular and
remote communities
SO6: To improve the efficiency, safety and
resilience of our transport networks for
people and freight and adapt to the impacts
of climate change.
1. Transforming our communities
and reducing the impact of
transport upon them
     
2. Connecting our communities      
3. Enhancing public transport
connectivity to / from: (i) Inverness;
(ii) our sub-regional centres; and
(iii) Scotland’s other cities and
beyond
     
4. Improving the integration, quality
of and access to public and shared
transport
     
5. Providing connectivity that
supports our island and peninsular
communities
     
6. Improving the efficiency of
transport networks and supply-
chains and reducing their impact
on our communities
     
7. Improving the safety, reliability
and resilience of our road and rail
networks    
 
8. Facilitating sustainable visitor
travel demand      
9. Decarbonising our transport,
mitigating the effects of climate
change
     
10. Embracing new technologies      
11. Reducing the cost of travel,
particularly for those most in need      
Page 185

Page 186

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
41 
5 Strategy Theme 1: Transforming our
communities and reducing the impact of
transport upon them
5.1 Overview
5.1.1 The transport networks in our region play an essential role in facilitating the movement of
residents, freight and visitors in our region. It is also integral to the delivery of essential
services such as health and social care, more so than elsewhere in Scotland. However,
transport can also imposes significant ‘costs’ on our communities, including road traffic
collisions, noise, vibration, poorer air quality, greenhouse gas emissions, limitations of being
able to walk, wheel and cycle, poor quality public realm and community severance.
5.1.2 The first theme of our RTS is therefore focused on transforming our communities and reducing
any negative impacts of transport upon them. We will do this through improving the public
realm and mobility within our settlements, reducing the dominance of the private car in
particular, and maximising opportunities for walking, wheeling and cycling. 
5.1.3 The figure below sets out the policy areas (i.e., the headings under which the respective
policies are grouped) covered under this theme:   
Figure 5.1: Strategy Theme 1 – policy areas
5.2 Reallocating road space to active travel
5.2.1 The dominance of vehicular traffic in our settlements means that walking, wheeling and
cycling is often unattractive, with opportunities to travel in this way interrupted by busy road
crossings and the absence of footways (or very narrow footways), whilst there is also a
general lack of dedicated, segregated cycle infrastructure, including both on-road and
segregated provision. This issue also diminishes the liveability of our communities.
Reallocating road
space to active travel
Reducing the impact
of traffic on our
communities
Managing the impact
of parking
Facilitating sustainable
land-use development
Page 186

Page 187

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
42 
5.2.2 Increasing rates of walking, wheeling and cycling in our communities will contribute to
reducing emissions, supporting healthier lifestyles, reducing inequalities and supporting
sustainable economic growth. To help overcome safety concerns, minimise traffic intimidation
and improve placemaking, road space should be reallocated away from general traffic to
walking, wheeling and cycling. This can be done through:
 The widening of walking and wheeling routes and the provision of additional
footways through the reallocation of existing road space from general traffic and parking
 Reducing road widths at junctions in settlements, tightening turning radii and slowing
down traffic
 The provision of new dedicated on-road cycle lanes, ranging from unprotected cycle
lanes through to fully segregated cycleways reflecting Cycling by Design
 The designation of Low Traffic Neighbourhoods, where motor vehicle traffic in
residential streets is greatly reduced
5.2.3 As well as our commitment to this principle, we consider it essential that, where traffic in
settlements is reduced by investment in road infrastructure (for example the proposed
settlement bypasses as part of the A96 dualling), road space reallocation should be
undertaken as an integral component of that investment.
5.2.4 We do however recognise the importance of ensuring that road space reallocation does not
have a negative impact on bus services, given our aspiration to increase public transport
mode share for journeys beyond settlements.
Policy ST1a: The RTS supports the principle of reallocating road space, including
parking, from general traffic. This should support placemaking to shape improved
walking, wheeling and cycling opportunities in our communities as a means to
promote safe active travel and encourage use of active travel modes. Reallocation
of road space should avoid any negative impacts on bus services.
Policy ST1b: Where traffic in settlements is reduced by investment in road
infrastructure, road space reallocation should be undertaken as an integral
component of that investment. 
5.3 Reducing the impact of traffic on our communities
5.3.1 Trunk and major A-roads often run through the heart of our communities, for example the
A9 through Golspie and Brora, the A82 through Inverness, Fort Wiliam and Fort Augustus and
the A96 through Nairn, Elgin and Keith. Our settlements therefore accommodate a higher
proportion of through / strategic traffic, including commercial vehicles and abnormal loads,
than is the case in some other parts of Scotland where the strategic network usually bypasses
settlements. Moreover, visitors to our region are often attracted to communities that are least
well-placed to accommodate them, Glenfinnan and the Quiraing on Skye for example,
impacting on local communities. 
5.3.2 Vehicular traffic therefore has a pervasive effect on some of our communities, imposing
negative impacts such as accidents, noise, vibration, intimidation and community
severance. Major settlements such as Elgin, Oban and Fort William experience significant
challenges in this respect, but it is common across the region. Outwith these larger
settlements, traffic speeds through towns and villages can be an issue, particularly on
strategic routes and also on routes to ports, where drivers can be ‘racing’ to catch a ferry.
5.3.3 We recognise the importance of mitigating and reducing the impact of this traffic on our
communities. There are different ways in which this objective can be achieved, including traffic
speed enforcement and traffic calming measures such as speed cushions, road humps, road
Page 187

Page 188

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
43 
narrowing, pedestrianisation, speed limit reductions and the establishment of 20mph zones in
settlements. The most appropriate actions will vary by settlement – e.g., what works for
Campbeltown may not work for Benbecula – but we recognise overall the imperative of
reducing any negative impacts of traffic on our communities.
Policy ST1c: The RTS supports the principle of traffic calming and speed limit reductions
and enforcement where this is the wish of our communities, including on the Trunk
Road network.
Policy ST1d: The RTS supports measures to reduce road-based severance in our
communities.
Policy ST1e: The RTS recognises the challenges presented by the impacts of increasing
abnormal load movements across the region. It calls for a coordinated approach to
be taken to ensure that appropriate planning and mitigation is put in place as part of
the planning process for new developments that will generate such movements.
5.4 Managing the impact of parking
5.4.1 Parking provision and enforcement varies across our region and between authorities with a
range of policies in place to manage local demand. In many smaller settlements, much of the
provision is on-street or indeed informal. The ready availability of free or low-cost parking can
encourage car use for some shorter journeys which could potentially be undertaken by active
modes, with resultant negative impacts such as traffic intimidation, emissions and noise. 
5.4.2 However, as with most other elements of the transport system in our region, there exists the
dual challenge of managing day-to-day parking requirements and peak season visitor
parking, particularly at ‘honeypot’ sites such as Skara Brae and the Fairy Pools. Traffic
management around ferry terminals can also be an issue (e.g., at Port Ellen and Oban),
particularly in peak season. 
5.4.3 A mixed approach to both provision and enforcement can lead to inappropriate parking.
Consequences of this include degradation of the public realm, lost trade for local businesses
and footpaths being blocked, a particular issue for certain protected groups such as those in
wheelchairs or pushing a pram. There are also particular risks associated with indiscriminate,
illegal and dangerous parking around our schools.  
5.4.4 We acknowledge the delicate balance between parking provision and enforcement and how
this varies across our region. However, we also recognise that illegal and indiscriminate
parking negatively impacts on our communities and the experience of visitors to our
region, and therefore support improved management of parking. We again recognise that the
most appropriate actions will vary by settlement and moreover that parking policy is a matter
for our constituent members. However, through the RTS, we see an opportunity to work with
our partner local authorities to develop more consistent approaches to some common
challenges, such as the provision of parking and facilities for motorhomes, solutions for
reducing private vehicle at ‘honeypot' tourist attractions and payment mechanisms. 
Case Study: School Streets – Holy Family Catholic Primary School, Ealing 
‘School Streets’ are roads outside of a school with a temporary restriction on motorised
traffic at school drop-off and pick-up times. The restriction is applied to school traffic and
through traffic and is a proactive solution to tackling local air pollution, poor health and road
safety risks. 
The use of School Streets is already widespread in London, and is growing in popularity in
Scotland, particularly in Edinburgh. Transport for London evaluated the impact of five School
Streets projects in 2022, one of these being Holy Family Catholic primary school, located in
Page 188

Page 189

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
44 
the Acton area of Ealing. The school is in close proximity to the busy North Circular Road
and acts as a shortcut for vehicles avoiding the North Circular and the busy Western
Avenue.
At this 474-pupil school, an extensive ‘School Street zone’ was established – all vehicles are
banned from this zone Monday – Friday during term time from 08:15-09:15 and 15:00-16:00
with the exception of: (i) residents and businesses located within the zone; (ii) emergency
and service related vehicles; (iii) Blue Badge holders who work at the school or a business
within the closure, or who are dropping off at the school or a business; and (iv) parents or
guardians of a child with a Blue Badge attending the school, for whom an exemption can be
applied for. 
The scheme was originally introduced using physical barriers manned by staff and parent
volunteers. However, due to some hostility from drivers, parents and residents, ‘volunteer
fatigue’ set-in, making recruitment more difficult and the Council therefore chose to introduce
enforcement by ANPR cameras.
The initiative has been highly successful:
 Half of all school staff agreed that the School Street reduced vehicle speeds,
improved safety, encouraged more walking and cycling and addressed issues such
as congestion and parking
 The average number of motorised vehicles per hour driving through the School
Street was 87% lower during the closure period than outside of it
 The average speed of motor vehicles during the morning and afternoon drop-off
period was circa 1mph lower than outwith the closure period
 An increased number of pedal cycles were observed during the closure period
Policy ST1f: The RTS supports greater consistency (in ‘like-for-like’ locations) of parking
management across our region, including payment mechanisms, parking information
and enforcement.
Policy ST1g: The RTS supports the principle of improving the management and
enforcement of traffic and parking around schools, including School Streets (a road
outside a school with temporary restriction on motorised traffic at school drop-off and
pick-up times). 
5.5 Facilitating sustainable land-use development
5.5.1 At the heart of our RTS is our commitment to reduce transport-related greenhouse gas
emissions in our region, supporting the national 2045 net zero target. However, this should be
achieved in a manner which reflects the characteristics of our region, including its geography
and the spatial distribution of its population. In general, we support the concept of ‘Triple
Access Planning’ (TAP) where the transport system (physical mobility), the land-use system
(spatial proximity) and the telecommunication system (digital connectivity) are delivered in an
integrated manner known as a Triple Access System (TAS).10
5.5.2 For many years, transport and land-use planning in our region has been largely predicated on
the ability to access employment, services and leisure opportunities by car, particularly in
Inverness but also in other major settlements such as Elgin, Fort William, Oban,
Campbeltown, Kirkwall and Stornoway. This has been compounded by a model of public
service delivery increasingly built on centralisation, particularly in health and education. We
therefore start from a position where a high proportion of journeys undertaken by car in
our region are essential rather than discretionary. Over the lifetime of the RTS and indeed
beyond, it is our aspiration that this need to travel is reduced through a growth in localism, 
10 Triple Access Planning for Uncertain Futures (tapforuncertainty.eu)
Page 189

Page 190

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
45 
where employment, service and leisure opportunities can be accessed locally or, where a
journey is required, by active travel or public transport. 
5.5.3 Planning for transport as part of new developments is essential if we are to ensure that an
‘infrastructure first’ approach (i.e., identifying and addressing the infrastructure capacity and
requirements arising from a development) is adopted and that such developments are created
in a manner that embeds sustainable transport provision from the outset and prevents car
dependency from becoming entrenched. The concept of Transit Orientated Development
(TOD) should be used where practicable to provide sufficient population density to make high
quality and regular public transport services viable. This requires the concentration of major
trip generating developments around public transport corridors (e.g., the A96), stops and
stations to be effective.
5.5.4 Placemaking and the development of a high-quality public realm are also essential to creating
spaces that people want to spend time in and feel safe walking, cycling and wheeling to get
around. This is integral to the concept of ‘Living Well Locally’ which aim to create attractive,
safe and walkable environments which connect people to the facilities and services for their
everyday needs via short walking, wheeling or cycling journeys. By designing around this
concept, planning focuses on walking, cycling and wheeling rather than car travel, helping to
align spatial planning and transport planning at a local scale. It can also enhance the
inclusivity of areas through improving connectivity to services which may not previously have
been readily accessible to some people who do not own or have access to a car. Once again,
we recognise that the concept of Living Well Locally will be more suited to more concentrated
settlements than outlying rural areas and thus there should be flexibility in the application of
the concept across our region, with active travel links from outlying areas into local hubs.  
5.5.5 In some instances, the application of TOD and Living Well Locally principles may make it
possible to explore the implementation of zero car developments, particularly in the Inner
Moray Firth area. These can be supported by shared mobility solutions which depart from
traditional car ownership models and allow people to access transport, including cars, on an
on-demand basis. This has the potential to reduce or remove the need for vehicle ownership
and provides people with a wider range of sustainable transport options than they would have
had under a traditional ownership-based approach. 
5.5.6 Shared mobility should be an integral part of all significant new developments. It will provide
scope to reduce parking provision and create an opportunity to increase density and / or
create additional green or blue space within new developments. Electric vehicle (EV) charging
provision will also be a fundamental requirement in all new developments.
Case Study: Tornagrain
Tornagrain is a new town being developed between Inverness and Nairn, just to the west of
Inverness Airport. It is an exemplar of a sustainably planned new settlement which will be
realised over the long-term. The planning permission, granted in 2012, allows for 5,000 new
homes, three primary schools, a secondary school, shops, employment space, parks and
other services. Tornagrain will have a town centre focussed on a High Street, with squares
at either end, together with surrounding neighbourhoods. Each neighbourhood will have a
centre, including a primary school, within five-minutes walk of the residents of that area. All
of the town’s residents will be within 10-minutes walk of the town centre.  
Whilst a long-term project (50-years), it is founded on sustainable development with local
employment, amenities and services. Within the town, the emphasis will be on walking and
cycling to local services and shops. For journeys beyond the town, there are bus services to
Inverness and Nairn, whilst rail services are available from the recently opened (2nd
February 2023) Inverness Airport railway station. 
Page 190

Page 191

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
46 
Policy ST1h: The RTS supports the prioritisation of new development in locations that
are in proximity to key services and already well-served by active travel and public
transport.
Policy ST1i: The RTS supports the local delivery of public services, including health and
education, and other day-to-day retail and personal services (e.g., banking) which
minimise the need to travel.
Policy ST1j: The RTS supports the integration of active travel, public transport and
shared mobility into the planning of all new developments. New development
proposals should be required to outline how they will connect into the local active
travel and public transport networks.
Policy ST1k: The RTS supports the concept of ‘infrastructure first’ in relation to major
developments across our region.
Policy ST1l: The RTS recognises the centrality of environmental considerations,
particularly biodiversity enhancements and nature networks, within the planning and
decision-making process. 
5.6 How does this Strategy Theme contribute to our RTS Objectives?
5.6.1 The table below summarises how this Strategy Theme contributes to our RTS Objectives:
Table 5.1: Contribution of Strategy Theme 1 to our RTS Objectives
RTS Strategy Objectives 
SO1: To make a just transition to a post-carbon and more environmentally sustainable
transport network 
SO2: To transform and provide safe and accessible connections between and within our
city, towns and villages, to enable walking, wheeling and cycling for all 
SO3: To widen access to public and shared transport and improve connectivity within and
to / from the region O
SO4: To improve the quality and integration of public and shared transport within and from
/ to the region O
SO5: To ensure reliable, resilient, affordable and sustainable connectivity for all from / to
our island, peninsular and remote communities O
SO6: To improve the efficiency, safety and resilience of our transport networks for people
and freight and adapt to the impacts of climate change. O
5.6.2 This Strategy Theme makes a highly positive contribution to our RTS Strategy Objectives in
two ways:
 At the settlement level, it prioritises active travel and reduces the impact of vehicular
traffic on communities, thus contributing to SO1. As well as supporting a reduction in
greenhouse gas emissions, it offers several wider environmental benefits including
improved local air quality, reduced noise, reduced severance and an improved public
realm.
 By supporting road space reallocation, improved parking management, traffic impact
reduction measures and positive land-use changes, this Strategy Theme will provide safe
and accessible connections within our settlements, contributing to SO2.
Page 191

Page 192

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
47 
6 Strategy Theme 2: Connecting our communities
6.1 Overview
6.1.1 This Strategy Theme is focused on improving and expanding opportunities for walking,
wheeling and cycling within and between our communities. Enabling more safe active
travel in our region requires the provision of integrated and high-quality routes for active travel
combined with measures to widen bicycle availability and promote walking, wheeling and
cycling as a means of travel. This is essential in enabling our residents to make healthy
journey choices and in creating places that are more accessible, inclusive and prosperous.  
6.1.2 We recognise that in parts of the region, factors like the geography, topography, climate and
low population density can make it both challenging and expensive to deliver active travel
infrastructure and promote journeys made by active modes. Transformational investment in
active travel infrastructure in our region will therefore be required if significant modal shift is to
be achieved, and any funding settlement must specifically recognise the challenges
posed by distance and our spatially dispersed population.  
6.1.3 The figure below sets out the policy areas covered under this theme:   
Figure 6.1: Strategy Theme 2 – policy areas
6.2 Improving and expanding walking, wheeling and cycling routes
6.2.1 There is significant variation in the provision, scale and quality of walking, wheeling and
cycling infrastructure across our region. Where provision is poor or non-existent, it can directly
reduce access for certain groups, including disabled people, the elderly, young people and
women.   
6.2.2 Regular walking and wheeling trips will by and large be local in nature, and thus our focus
will therefore be on improving the walkability (and ‘wheelability’) within or between proximate
settlements. Enhancements could include but are not limited to: improved crossing facilities;
improvements to existing routes to make them more direct, coherent, comfortable and
Improving and
expanding walking,
wheeling and cycling
routes
Widening the
availability of cycling
Promoting walking,
wheeling and cycling
Page 192

Page 193

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
48 
attractive; new or enhanced signage, lighting, surfacing etc; rationalisation of street furniture
and other obstructions; and the implementation of physical accessibility improvements on
existing routes (including the enforcement of pavement parking).
6.2.3 Many cycling routes in our region (at least where these are formalised) are on or alongside
major roads, including high-speed Trunk Roads and A-roads, or, at the other end of the scale,
narrow single-track roads, many of which have poor sightlines and still carry significant
volumes of traffic including commercial vehicles. Design standards implied by Cycling by
Design11 are not widely met – this is reflected in the sparse nature of the National Cycle
Network in our region. This gives rise to a range of issues such as safety risks, traffic
intimidation, noise etc., creating an unattractive environment for cycling journeys, particularly
for occasional or infrequent cyclists. These issues are significantly amplified during the winter
months with reduced daylight and more inclement weather. Upgrades to and the formalisation
of existing cycle routes, in addition to new routes are therefore necessary to expand the
number of journeys made by bicycle.
6.2.4 Many walking and wheeling, and some cycling trips will be to access public transport,
be that the local bus service, railway station, ferry terminal or, in some island communities,
airfields. Promoting high quality ‘first mile / last mile’ walking, wheeling and cycling routes to
transport interchanges is a clear and obvious means through which our RTS can contribute to
reducing vehicle kilometres and transport-related emissions. It is important that such routes
are safe and secure, direct and regularly treated during the winter months. In island and rural
communities, a locally appropriate solution would be to provide safe walking routes to bus
stops within townships. For many households in rural locations where there is no footpath and
the road adjacent to the house is unsafe for walking, wheeling or cycling due to traffic volumes
and speed, then residents effectively have no option to travel sustainably from their own
home. 
6.2.5 In addition to improving existing walking, wheeling
and cycling infrastructure, there would be benefit in
investing in new ‘greenfield’ active travel routes.
We will also look to expand the number of ‘quiet
roads’12 on minor rural roads following pilots at
Glencoe and on Skye. It is essential that such
routes are designed to the current standards and
apply the principles of inclusive design, whilst
minimising or eliminating conflicts with vehicular
traffic. The development of new routes of this nature
would be particularly beneficial for journeys
between settlements, creating a regional network
that facilitates longer-distance active travel
journeys.
6.2.6 We also recognise that many active travel journeys
in our region are made for leisure purposes. This
includes journeys on designated routes such as the
Great Glen Way and Hebridean Way but also
circular walking, wheeling and cycling journeys in
and around our settlements. We recognise the
importance of these routes to the visitor economy, but also as dual use facilities which provide
residents of our region with the opportunity to make functional active travel trips between
settlements. 
11 https://www.transport.gov.scot/media/50323/cycling-by-design-update-2019-final-document-15-september-
2021-1.pdf 
12 Quiet roads are designated rural roads where traffic volumes and vehicle speeds are already low, and are
aimed at encouraging people to travel by foot, by bike and on horseback.
Page 193

Page 194

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
49 
Policy ST2a: The RTS supports transformational investment in the improvement of our
existing active travel networks to make these accessible to all.
Policy ST2b: The RTS supports the reinstatement and expansion of a network of
strategic and local traffic free / quiet walking, wheeling and cycling routes to
connect communities across and beyond our region.
Policy ST2c: The RTS supports the expansion of the National Cycle Network to all parts
of the region.
Policy ST2d: Our active travel infrastructure should be designed to a high standard in
accordance with the most up-to-date best practice and regionally appropriate
design standards (as this evolves) to meet the needs of all users.
Policy ST2e: The RTS supports the integration of active travel and public transport
connections within our communities.
Policy ST2f: The RTS promotes the adoption of measures outlined in the Sustainable
Travel to Stations Strategy with respect to access to railway stations.
6.3 Widening the availability of cycling
6.3.1 Our region has one of
the highest
household bicycle
availability rates in
Scotland, with 46% of
households having
access to at least one
bicycle. And while
cycling levels vary
across the Highlands
and Islands, the
HITRANS region as a
whole has a higher
share of people cycling
to work than any other
region in Scotland.
However, there is a
significant body of
literature which
highlights differential
access to cycling
amongst those with protected characteristics. Whilst in some cases this is due to limited
cycling infrastructure (i.e., it is a function of supply), for others, and particularly those on low
incomes, the main issue is the cost of owning and maintaining a bicycle. his is particularly the
case for electric bicycles (e-bikes) which cost significantly more to purchase and also cost
money to charge.
6.3.2 Encouraging the uptake of cycling will therefore depend on increasing access to bicycles, and
‘normalising’ cycling across the region. This can be done both through supporting the cost of
purchasing a bicycle or by expanding the coverage of our existing Hi-Bike electric bike share
schemes (and other schemes of this nature). We consider it essential that cycling
opportunities are accessible to all and, to this end, adaptive bicycles should be available as
part of any bike hire or share schemes. Through the evolving picture with respect to funding
and delivery we will also work with employers and developers within our region to encourage
Page 194

Page 195

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
50 
and support them to provide secure bicycle parking and suitable changing facilities at their
premises.
Case Study: Hi-Bike
Promoted and supported by HITRANS, the HI-Bike system launched in Inverness in October
2021 and has expanded within the city and was also introduced to Fort William in 2022. The
introduction of Hi-Bike was funded with support from Transport Scotland’s Regional Active
Travel Grant, e-Bike Grant Fund and two EU programmes (North Sea Region Stronger
Combined Project for Inverness and Low Carbon Transport and Travel ERDF Funding for
Fort William). The implementation was led by HITRANS and Lochaber Environment Group,
with HITRANS now responsible for the continued operation of the scheme. 
Since the scheme was launched in late 2021 there has been steady growth in regular users.
As of January 2024, there were nearly 1,000 regular users who have purchased 2,700
memberships. Additionally, there has been 12,000 single use users purchasing either a 3-hr
pass which is common for tourists and visitors, or a pay-per-ride pass. This equates to a
total of almost 13,000 users of the Hi-BIKE scheme since it launched. Furthermore, there
have been almost 48,000 individual unlocks and 220,000 km travelled which can be
calculated as 30,448 kilograms of CO2 saved by traveling by Hi-BIKE. Evidence of existing
users also demonstrates that it is already supporting members to both obtain and maintain
employment opportunities. 
Additional bikes and docks are to be introduced in Inverness in 2024 and further expansion
is planned to other parts of the Highlands and Islands including Elgin. 
Page 195

Page 196

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
51 
Policy ST2g: The RTS seeks the implementation of initiatives which widen access to
bicycles and e-bicycles, including e.g., promoting ownership, expansion of bicycle
share and hire and provision of new ‘first mile, last mile’ cycling opportunities.
Policy ST2h: The RTS supports the upgrade and new provision of bicycle parking and
facilities at all public buildings, transport interchanges and key on-street locations
within the region.
6.4 Promoting walking, wheeling and cycling
6.4.1 There is a significant body of evidence highlighting the health and wellbeing benefits of active
travel, which are supplementary to the environmental benefits offered. However, a prominent
barrier to encouraging walking, wheeling and cycling is perception and a lack of
information. Moreover, many visitors to our region are interested in outdoor pursuits and thus
ensuring that they have the information on available walking, wheeling and cycling possibilities
provides an opportunity for modal shift amongst visitors. 
6.4.2 Promoting the benefits of active travel and highlighting options for engaging in walking,
wheeling and cycling journeys is important to increasing uptake. Our GO-HI app provides a
platform through which mapping and other information can be provided. However,
encouraging increased walking, wheeling and cycling requires the input of a much wider range
of partners including our constituent local authority members and public transport operators in
the region. Each of these organisations have their own plans and targets of increasing active
travel uptake, making coordinated, consistent and coherent messaging and information
essential. The evolving funding and delivery picture will enable us to develop coordinated
proposals with our partner councils for encouraging behaviour change with consistent
messaging and a series of initiatives promoting walking and cycling that focuses of daily trips
to work and school.
Policy ST2i: Our active travel network should be developed, presented and promoted
in a more coherent, recognisable and integrated way for regular, occasional and
new users of the network, including visitors.
6.5 How does this Strategy Theme contribute to our RTS Objectives?
6.5.1 The table below summarises how this Strategy Theme contributes to our RTS Objectives:
Table 6.1: Contribution of Strategy Theme 2 to our RTS Objectives
RTS Strategy Objectives 
SO1: To make a just transition to a post-carbon and more environmentally sustainable
transport network 
SO2: To transform and provide safe and accessible connections between and within our
city, towns and villages, to enable walking, wheeling and cycling for all 
SO3: To widen access to public and shared transport and improve connectivity within and
to / from the region O
SO4: To improve the quality and integration of public and shared transport within and from
/ to the region 
SO5: To ensure reliable, resilient, affordable and sustainable connectivity for all from / to
our island, peninsular and remote communities O
SO6: To improve the efficiency, safety and resilience of our transport networks for people
and freight and adapt to the impacts of climate change. O
6.5.2 This Strategy Theme makes a highly positive contribution to our RTS Strategy Objectives in
two key ways:
Page 196

Page 197

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
52 
 By focusing specifically on policies which will grow both the absolute number of active
travel journeys and its percentage mode share, our RTS will support a just transition to a
post-carbon and more environmentally sustainable transport network for all (SO1)
 It will also make a highly positive contribution to SO2, through providing safe and
accessible walking, wheeling and cycling connections within and between our settlements
 When integrated as part of wider mobility planning, the policies set out in this theme will
also contribute to SO4
Page 197

Page 198

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
53 
7 Strategy Theme 3: Enhancing public transport
connectivity
7.1 Overview
7.1.1 Public transport connectivity is fundamental to the functioning of our region and its interactions
with other regions of Scotland and beyond – it plays several key roles including:
 Connecting residents to employment, particularly in Inverness, our larger settlements
such as Elgin, Fort William, Oban and Thurso and our main island settlements such as
Kirkwall, Stornoway and Tobermory
 Connecting our businesses to labour and to other businesses in the region,
elsewhere in Scotland and beyond
 Facilitating access to public and personal services such as health, education, retail
and banking. Access to healthcare facilities is particularly important in this respect
given the pressure on, and challenges in, the delivery of patient transport.
 Providing connectivity for those without access to a car and / or who would prefer not
to drive
 Underpinning the social fabric of communities, where the above factors combine to
support community viability in the first instance, and thereafter in providing a balanced
population and economy and transport options that are environmentally sustainable
and equitable
7.1.2 There are three components of public transport connectivity in this context:
 Network geographical coverage: The bus, community and demand responsive
transport, rail, ferry and air services that collectively form a network of connections for our
communities
 Timetables / connections: The number of days on which a service operates, the
frequency at which it operates and the time of the first and last service
 Journey times and journey time reliability: How long the journey takes, including the
time on-vehicle and ‘door-to-door’ journey time, and the extent to which the service
operates (i.e., is not cancelled) and arrives on time
7.1.3 Public transport connectivity is one of the fundamental transport challenge facing our
region. Distance, topography, geography and low population density have combined with
increasing costs and diminishing budgets to threaten the sustainability of many routes, ranging
from local bus services to commercially operated air services. 
7.1.4 The figure below sets out the policy areas covered under this theme:  
Page 198

Page 199

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
54 
Figure 7.1: Strategy Theme 3 – policy areas
7.2 Reducing social exclusion
7.2.1 Inequality is a consequence of our limited public transport network, both in terms of
geographic coverage and service provision. For many households in our region, they have
little option but to accept the cost of owning and running a car or a second car (i.e., ‘forced’ car
ownership) if they are to make essential journeys. In some households, those who cannot
drive or do not have access to a car face social exclusion. This Strategy Theme is therefore
focused on improving land-based public transport connectivity for journeys within, to and from
our region by expanding the network, providing more connections and making journeys
quicker and more reliable. Air and ferry services are considered separately in Strategy Theme
5, and the cost of travel is covered in Strategy Theme 11.
Policy ST3a: The RTS supports measures to reduce social exclusion for those without
access to a car.
7.3 Bus and coach services
7.3.1 Buses are the backbone of the public transport network in our region – services vary from
commercial long-distance coach services to conventional urban and suburban services in
areas such as the Inner Moray Firth and Lochaber to small minibus operations that serve the
most geographically remote parts of our region, sometimes with only one bus per day in each
direction. 
7.3.2 There has been a long-term decline in bus passenger numbers in our region, despite the
operation of a broadly stable number of bus kilometres, as is shown in the figure below. 
Reducing
social exclusion
Bus and coach
services
Community
and Demand
Responsive
Transport
Railway
services
Railway stations
Page 199

Page 200

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
55 
Figure 7.2: Bus kilometres and passenger numbers in the HITRANS region (2019-20 = 100) (Source: Scottish Transport
Statistics 2022)13
7.3.3 In 2018-19, bus passengers caried in the region were around 80% of their 2004-05 level and
reduced to circa 30% of that level during the COVID-19 pandemic.14 Whilst bus networks
across Scotland are facing an uncertain future, this is particularly true in rural areas. An
increase in bus travel by those under 22 has not offset a decline in bus use by those 60+
since the pandemic. By 2022-23, passenger numbers were still 29% down on pre-pandemic
levels and the withdrawal of COVID-19 support grants has made some routes unviable.
Moreover, the bus industry generally is facing a shortage of drivers, whilst the existing labour
force is ageing. This is further compounded by current (2023) high fuel prices and general
inflation, where costs are increasing at a time when the revenue base is diminishing.
7.3.4 A key factor which disincentivises the use of the bus is that journey times are often long -
whilst this is obviously to some degree reflective of the distances involved, commercial
realities mean that buses often need to make diversions off main routes to make multiple
stops, slowing down journeys even further. In larger settlements such as Inverness, Elgin and
Fort William, bus services are also affected by more conventional congestion associated with
peak commuting periods and seasonal tourist traffic. 
7.3.5 In our urban areas, where congestion affects bus journey time reliability, there is a
requirement for further bus priority measures (including on Trunk and major A-roads) such as
bus lanes, bus gates and bus pre-signals where appropriate, and initiatives which reduce bus
stop dwell times such as smart ticketing. In our rural areas and island communities, a more
holistic approach is required which considers the structure of the network, integration with
other modes such as rail and the potential for Demand Responsive Transport (DRT) to
supplant conventional bus services (as explained in Section 7.3).
7.3.6 Bus service frequency across some parts of our region is low. In our most remote
communities: 
13 Scottish Transport Statistics, data for Eilean Siar, Highland, Moray, Orkney Islands, Shetland Islands, Argyll &
Bute
14 Source: Scottish Transport Statistics 2022.
0
20
40
60
80
100
120
140
160
2019/20 =100
Bus km Bus passengers
Page 200

Page 201

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
56 
 There is sometimes only one bus service per day, with the return journey slotted in
between school transport requirements thus limiting meaningful time at destination
 There are instances where the public bus route is part of the school bus network and
thus only operated on school days, e.g., Glendale and Milovaig in Skye15  
 There are further instances where a community has no scheduled bus service at all,
e.g., Port Appin and the Waternish Peninsula in Skye
7.3.7 The figures below show the frequency and the times of the first and last buses from each
designated stop in our region, which provides an indication of the time allowed to users of
these stops to undertake activities across the day. 
15 https://tiscon-maps-
stagecoachbus.s3.amazonaws.com/Timetables/North%20Scotland/Highlands/Skye%20Revised%202022.pdf 
Page 201

Page 202

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
57 
Figure 7.3: Bus service frequencies across the HITRANS region (Source NaPTAN, Q2 2022)
Page 202

Page 203

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
58 
Figure 7.4: First bus from each stop in the HITRANS region (Source: NaPTAN, Q2 2022)
Page 203

Page 204

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
59 
Figure 7.5: Last bus from each stop in the HITRANS region (Source: NaPTAN, Q2 2022)
Page 204

Page 205

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
60 
7.3.8 The above figures highlight that, outwith the Inner Moray Forth and a handful of other
locations such as Stromness, Stornoway and Kirkwall, bus frequency in our region is very low
and the last bus is often relatively early. This means that those travelling to an urban centre
such as Inverness can either have too little time to carry out their activities in a single day or
alternatively could have a long wait between services. In addition, there are many settlements
and transport interchanges in our region from which bus connections are indirect. This all adds
to both the time and cost of travel, which is disproportionately greater than for equivalent
journeys in central Scotland.
7.3.9 This analysis highlights locations across our region where bus services need to be enhanced
to improve non-car based access to employment and essential services and to reduce the
likelihood of people suffering from transport-induced deprivation. In many of these locations, a
combination of new bus services, increased frequencies on existing bus services, earlier
first departures and later last arrivals would improve connectivity and reduce the scope for
transport-related social exclusion.   
7.3.10 We recognise the challenges of bus service viability in the many rural parts of our region,
where an ever-increasing level of subsidy is required to maintain a basic service that caters for
fewer and fewer passengers. The provision of a core rural bus network is essential if we are to
reduce social exclusion but it is also important to recognise that there are other ways of
delivering this connectivity, including through providing feeder services to railway stations and
DRT (as previously mentioned). 
7.3.11 The Transport (Scotland) Act 2019 provided new powers in relation to buses, including the
ability to introduce Bus Service Improvement Plans and local franchising. The application of
these powers may in some cases be an appropriate means of delivering improvements to the
bus network in our region and we will explore this as part of our first RTS Action Plan. Indeed
The Highland Council has now set up an in-house bus company in the light of the increasing
costs associated with tendered services from local operators.16
Case Study: Inverness and Cromarty Firth Green Freeport
On 13th January 2023 it was announced that Inverness and Cromarty Firth was successful
in being awarded Green Freeport status by Scottish and UK Governments. The primary
objective is to maximise the local benefits from a pipeline of renewable energy projects
which will create business opportunities and employment, attract inward investment,
research and development, and position the Highlands at the heart of the country’s
commitment to becoming a net-zero economy. 
16 https://www.busandcoachbuyer.com/highland-council-launching-in-house-bus-company/
Page 205

Page 206

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
61 
When operational, the Green Freeport will offer a package of tax and customs incentives to
attract inward investment and stimulate innovation and growth. 10,000 jobs and £3bn of
investment is forecast. The proximity of the area’s deep water port facilities and available
development land to the leased floating offshore wind sites in the North Sea will drive
demand for transport and infrastructure investment. HITRANS has already been engaging
with the Freeport and other key stakeholders to understand the range of transport
improvements required to support what will be a step change in economic investment within
the area and enable the wider Highland economy to benefit. 
An early win was the Sumitomo announcement in February 2024 for a £350m high voltage
cable factory at Nigg, which will supply offshore wind developments, creating 330 jobs over
10 years including 156 manufacturing jobs at the plant. 
The Cromarty Firth element of the Green Freeport highlights however the weakness of our
public transport services in the area. The limited bus (and train) services that operate from
the Invergordon and Nigg areas are orientated around a working day in Inverness, and thus
do not facilitate travel to this part of the Green Freeport site. Without intervention to
improve public transport services, employee and business travel to and from
Invergordon and Nigg will be by car, generating additional vehicle kilometres and
emissions.
Policy ST3b: The RTS recognises that the decline in bus passenger numbers in the
region needs to be reversed and supports measures to extend service coverage,
improve frequencies, lengthen the operating day and make the network more
integrated.
Policy ST3c: The RTS supports measures to reduce bus journey times between and
within settlements in the region, including through the provision of bus priority
measures. 
7.4 Community and Demand Responsive Transport
7.4.1 Whilst we strongly support the retention and development of a core rural bus network, we also
recognise that there are instances where our spatially dispersed population cannot be
affordably, practically or efficiently served by scheduled bus services. Indeed, community
transport (CT) and Demand Responsive Transport (DRT) has been a long-term feature of the
transport network in our region, connecting local residents to employment and services. For
Page 206

Page 207

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
62 
example, the award winning ‘m.connect’ DRT service, operated by our partners at Moray
Council, has over many years provided accessible door-to-door bus services for those who do
not have a regular scheduled bus service and since May 2023 has provided the first such DRT
service to operate across the entire local authority area. 
7.4.2 There are various CT and DRT models in operation, with some operating a semi-fixed route
and fixed timetable and others zonally based with no fixed start or end point. Taxis are also an
important part of this solution in some areas. Providers include the public sector and charities.
More recently, ‘Enhanced’ DRT (EDRT) services have emerged, which are technology-led
DRT solutions using an app-based booking system, direct messaging, dynamic vehicle
scheduling and GPS vehicle tracking. These may appeal to a new demographic who would
otherwise not use DRT.
7.4.3 DRT and Enhanced DRT could be used to enhance or replace fixed route bus services across
our region where there is insufficient demand or funding to justify a traditional timetabled bus
service or a timetabled bus service at a meaningful level of frequency. This could include
providing / supporting CT, DRT and EDRT services to:
 Supplement or replace timetabled bus services on routes where the frequency is low,
including providing early morning, late evening or weekend services
 Reduce the need for passenger / patient transport to hospitals
 Provide connections to long-distance coach services
 Provide connections to railway stations
Case Study – Moove Flexi & m.connect Demand Responsive Transport Services
Moove Flexi is a demand responsive transport system aimed at improving the booking,
operation and marketing of existing on-demand public transport services in the region. The
project secured funding from Transport Scotland’s MIF
Round 2, The Scottish Government Islands team,
Smarter Choices Smarter Places and two of HITRANS’s
European projects; G-PaTRA and MOVE. In December
2021, HITRANS awarded an initial 3-year contract to
Liftango to deploy the system, which consists of a
booking app, an operations portal and a driver’s tablet. HITRANS has since worked with the
company to develop branding, a website and onboard services to trial the system. 
Moove Flexi has been successfully deployed in the Ferintosh Community Council (Black
Isle) and has had a significant impact on service usage, contributing to yearly passenger
totals increasing by over 100% from 2022 to 2023. 
The system has also been introduced across Moray as part of the Council’s rebranded
m.connect service, formally known as Dial M for Moray. Since launching in May 2023,
m.connect has also seen an increase in total passengers and a positive response to the new
booking app with one passenger stating “I have found m.connect to be a game changer for
me…the app gives me instant access to booking the journeys I need”. 
Page 207

Page 208

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
63 
Other operators currently involved in the project include the Far North Bus who operate in
Durness, Wheels in Nairnshire and Glenfarg Community Transport. 
Moove Flexi provides operators the opportunity to boost the use and efficiency of their
demand responsive services and give their users an alternative, more flexible booking option
and receive status updates in real-time.
Policy ST3d: The RTS supports innovative alternatives to fixed route bus services where
these can be affordably provided.
Policy ST3e: The RTS recognises the role which community transport and Demand
Responsive Transport (DRT) plays in our most rural communities and supports its
expansion and integration with timetabled services.
Policy ST3f: The RTS supports measures to widen the awareness and use of community
transport, DRT and EDRT amongst all members of society.
Policy ST3g: The RTS recognises the role of taxis as a key element of transport provision
in the region where community transport, DRT and EDRT services are not provided.
7.5 Railway services
7.5.1 The railway network in our region caters for a combination of long-distance travel to Aberdeen,
the Central Belt and England and local journeys, predominantly in the Inner Moray Firth area
(at least in terms of passenger numbers). A unique feature of this network is that its lengthy
route sections (e.g., Perth – Inverness, Inverness – Wick / Thurso etc) are almost entirely
single track. Indeed, Inverness is the only rail-connected city in Britain17 that is not
served by a continuous double track railway in any direction.  
7.5.2 Rail journey times across our region are therefore long, with average speeds much slower
than in the Central Belt and indeed much of the UK generally. This is largely a product of the
very limited physical infrastructure and, in some cases such as the Far North Line, indirect
routeing caused by the terrain e.g., major river firths.
7.5.3 The consequence of these long journey times is that the train is generally not competitive with
the car for many journeys, for example Glasgow Queen Street – Fort William and Inverness –
Wick / Thurso. Rail in the UK commonly enjoys significant journey time advantages for long-
distance inter-urban connections (e.g., Edinburgh – London, Manchester - Cardiff etc.) but
road-based journey times from Inverness to Aberdeen, Edinburgh, Glasgow and Perth are all
competitive with rail. Long journey times are compounded by low frequency, often making the
train unattractive for time critical journeys.
7.5.4 We recognise that, in most cases, significant journey time improvements can only be delivered
through investment in e.g., improved signalling, line speed improvements, track (re)doubling to
reduce the need to build in time for trains crossing in loops etc. The first STPR published in
2008 proposed a sub two-hour, hourly Aberdeen to Inverness journey time, while the Highland
Mainline anticipated hourly services with a fastest journey time of 2:45, average times of 3:00.
Neither of these proposed improvements have been delivered. 
17 Only the very small and historic cities of Ripon (population 16,700), St Asaph (3,300), St Davids (1,900) and
Wells (12,000) are not rail connected at all. 
Page 208

Page 209

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
64 
7.5.5 Whilst it is recognised that developing a
business case for transformative investment
in the Far North, Kyle and West Highland
Lines will always be challenging,
incremental measures can be pursued to
support reduced journey times, including
line speed improvements, level crossing
enhancements or closures, timetable
planning measures and conversion of some
scheduled low demand stations to request
only, (although this would only make a
marginal difference). In the medium to long-
term, new rolling stock with faster
acceleration and deceleration profiles may also assist in reducing journey times. 
7.5.6 A further consequence of the highly constrained railway infrastructure is that rail service
frequency across our region is extremely low. For example, excluding the Caledonian
Sleeper:
 Fort William has the lowest service frequency of any town of its size in the entirety of the
UK, with only three trains per day in each direction to / from Glasgow Queen Street
 Inverness only has 13 services per day to and from the Central Belt (seven for Glasgow,
five for Edinburgh and one travelling on to London Kings Cross)
 Similarly, Inverness only has 11 services per day to and from Aberdeen, although a
further six services operate to Elgin.
7.5.7 Frequency to / from Inverness is significantly lower than other UK cities of a similar
population such as Stirling, Dunfermline, Lancaster and Winchester. Rail service frequency
within our region is also very low, with only four departures per day from Inverness to Kyle
of Lochalsh and Wick / Thurso.
7.5.8 We strongly support increased rail service frequency to Aberdeen and the Central Belt but
recognise that any transformational change will require the delivery of the committed
improvements to the Highland Mainline and Aberdeen – Inverness Line. We would also
support the operation of a Saturday evening Caledonian Sleeper service from Fort William and
Inverness, at least in the summer months, where it could support the weekend short stay
market in our vibrant visitor economy, and the inclusion of Oban as a sleeper destination.
7.5.9 In the shorter-term, there are opportunities to deliver more locally focused service
improvements largely using existing infrastructure. These include, for example, operating
additional local services in the Fort William area in the gaps between currently timetabled
services and bringing weekend provision to a level equivalent to a standard weekday,
recognising the national post-COVID-19 growth in leisure travel by rail. Our initiative of
establishing the ‘Invernet’ services (the Inverness commuter market) has demonstrated how a
good local rail product can grow passenger demand. This will be important if we are to provide
a clear alternative to the car and ensure that our region makes its fair contribution to national
vehicle kilometre and carbon reduction targets.
Case Study: Additional Dalmally – Oban service
In 2013, we worked with ScotRail to introduce an additional return service between Dalmally
and Oban to facilitate travel to and from Oban High School. The morning service starts from
Glasgow Queen Street at 05:20, providing an additional long-distance connection in both
directions as this unit works back to the Central Belt in the evening, departing Oban at 18:11.
This service replaced long-distance and expensive school bus connections from settlements
Page 209

Page 210

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
65 
east of Oban as far as Dalmally. The timetable was built around this but offered a wider
range of benefits, including:
 Additional opportunities for residents to make local commuting, personal business,
retail and leisure trips.
 Improved connections for long-distance travellers from other parts of the country,
especially tourists. 
 Enhanced irregular commuting possibilities into Glasgow due to the wider spread of
departures at both ends of the school day.
 Improved integration with the wide range of ferry services which operate from Oban.
The new service led to a consistent and significant increase in use of the stations along this
stretch of line. Use of Oban station grew by nearly 50% from 2013 to 2014 and demand
remained consistent over the five years prior to the pandemic. 
There were a wide range of benefits for from a school transport perspective, including the
reallocation of buses to strengthen other services, reduced late arrival at school due to traffic
congestion, reduced journey times for pupils and fewer issues with pupil behaviour. Pupils
were also able to engage in after school activities and return home on later trains. The same
applied to those who were able to secure after school jobs.
Policy ST3h: The RTS recognises that rail journey times to, from and within the region
are typically longer than elsewhere in Scotland, and therefore supports measures to
reduce these journey times.
Policy ST3i: The RTS supports the commitment to electrify the Highland Mainline and
Aberdeen to Inverness as an opportunity to reduce rail journey times and improve
reliability as part of the overall decarbonisation of the network.
Policy ST3j: The RTS recognises that very low rail service frequency often makes rail
uncompetitive with the car and therefore supports measures which would facilitate
increased rail service frequency, particularly between Inverness and Aberdeen,
Edinburgh and Glasgow.
Policy ST3k: The RTS promotes and supports the development of additional local rail
services focused on our regional centres.
Policy ST3l: The RTS supports infrastructure measures which would enable increased
service frequency, such as the electrification of the Highland Mainline, Aberdeen to
Inverness and improvements to the signalling system.
7.6 Railway stations
7.6.1 As in other rural areas of the UK such as Gwynedd, the Conwy Valley and Norfolk, the railway
network plays an important role in supplementing local bus services, or indeed acting as the
‘local bus service’. On lines of this nature, often basic stations are provided short distances
apart, providing connectivity for small towns and villages to larger centres of population. This
is a model which has worked well in our region, and we have a strong track record of
supporting the delivery of new proportionate low-cost railway stations which support the local
travel needs of communities, good examples of this being the single short platform stations at
Beauly and Conon Bridge.
7.6.2 We have ambitions to open new stations in our region, with current proposals including
Inverness East, Evanton, Faslane (for H.M. Naval Base Clyde), Torlundy (for the settlement
and Nevis Range) and Carrs Corner (for Lochaber High School and Fort William). 
Page 210

Page 211

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
66 
7.6.3 Given the generally low travel volumes, it is important that any future station in our region is
delivered in a proportionate manner that minimises costs. For example, Beauly and
Conon Bridge were both delivered with short platforms at which only one set of carriage doors
can open. This was however entirely appropriate for the level of demand ensured that a viable
outcome could be realised.
Policy ST3m: The RTS supports the planning and delivery of new railway stations,
including innovative solutions proportionate to the location, subject to the
development of an appropriate business case.
7.7 How does this Strategy Theme contribute to our RTS Objectives?
7.7.1 The table below summarises how this Strategy Theme contributes to our RTS Objectives:
Table 7.1: Contribution of Strategy Theme 3 to our RTS Objectives
RTS Strategy Objectives 
SO1: To make a just transition to a post-carbon and more environmentally sustainable
transport network 
SO2: To transform and provide safe and accessible connections between and within our
city, towns and villages, to enable walking, wheeling and cycling for all O
SO3: To widen access to public and shared transport and improve connectivity within and
to / from the region 
SO4: To improve the quality and integration of public and shared transport within and from
/ to the region 
SO5: To ensure reliable, resilient, affordable and sustainable connectivity for all from / to
our island, peninsular and remote communities 
SO6: To improve the efficiency, safety and resilience of our transport networks for people
and freight and adapt to the impacts of climate change. O
7.7.2 This Strategy Theme will make a highly positive contribution to facilitating our region’s
transition to a post-carbon and more environmentally sustainable transport network (SO1). As
has been detailed, the frequency and journey times offered on our bus and rail services are
unattractive when compared to the car, and it is essential that this differential is reduced if our
region is to fully contribute to national vehicle kilometre and carbon reduction targets.
7.7.3 Current levels of public transport connectivity are a significant barrier to regional economic
growth and a contributory factor to transport poverty, inequality and social exclusion.
Improvements to public transport connectivity to, from and within our region will widen access
to public transport (SO3) and support a range positive economic and societal impacts.
7.7.4 By improving the coverage and frequency of public transport services and reducing journey
times, this Strategy Theme will:
 Improve the quality and integration of public and shared transport to, from and within our
region (SO4)
 Support our island communities through providing viable onward transport connections
from ferry terminals and airports (SO5) 
Page 211

Page 212

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
67 
8 Strategy Theme 4: Improving the integration,
quality of and access to public and shared
transport
8.1 Overview
8.1.1 Whilst improving public transport connectivity is essential, the full benefits of this will not be
realised if the services provided are poorly integrated, of low quality and not fully accessible.
This Strategy Theme is therefore focused on addressing the impediments to travel by public
transport, including interchange within and between modes, physical and other barriers for
those less able and poor-quality facilities and travel information. 
8.1.2 The figure below sets out the policy areas covered under this theme:   
Figure 8.1: Strategy Theme 4 – policy areas
8.2 Public transport integration
8.2.1 The ability to easily and conveniently (or seamlessly) switch from one bus to another or from a
bus to a train is a factor which influences the attractiveness of public transport in any setting.
However, it assumes a particular importance in our region for two reasons:
 Very low public transport service frequency across many parts of our region means
that a missed connection can lead to a long wait for the next service or, in some
instances, will require a costly overnight stay
 For those living in our island communities, almost all journeys to the mainland will
require at least one interchange, often more
8.2.2 So, what is meant by ‘seamless integration’ – there are three components to this:
Public transport
integration Mobility hubs
Travelling with
bicycles to and
on public
transport
Access to and
the quality of
bus services
Access to and
the quality of
rail services
Access to inter-
island air
services
Blue Badge
parking
Improving
public
transport
information
Improving
digital
coverage in
our region
Supporting those
less able to use our
public transport
network
Access to and
the quality of
taxi services
Page 212

Page 213

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
68 
 The ability to reliably interchange between public transport services on the same day
and with minimum wait time
 Transport interchange facilities that make it attractive and physically easy to switch
between services, particularly for those with a mobility or sensory impairment or who are
travelling with young children, luggage etc.
 Ideally, the ability to make a door-to-door journey with a single ticket
8.2.3 Enhancing integration within and between modes of transport reduces the actual and
perceived barriers to multi-leg journeys, which in turn helps to ensure that public transport is
seen as a viable alternative to the car. 
8.2.4 A particular challenge faced in achieving seamless bus-to-bus and bus-to-train integration
between services is competition between commercial operators. For example, Scottish
Citylink competes with ScotRail on several long-distance routes, e.g., Oban to Glasgow.
Whilst there are examples of integrated ticketing, for example the availability of PlusBus18
tickets in Elgin, Fort William and Inverness, these are few and far between and are not widely
used or promoted. 
8.2.5 Timetable coordination is also difficult given often long route distances, particularly as some
bus services need to be planned to accommodate school transport. Similarly, ScotRail
timetables are heavily influenced by constraints imposed by the very limited infrastructure in
our region and the availability of paths in the Central Belt for longer-distance services.
8.2.6 Improving integration will in many cases depend on being able to increase bus service
frequency (increasing train service frequency is more difficult, although not impossible, as the
Dalmally – Oban case study in the previous chapter highlights). However, there is potentially a
case for a more radical review of the role of the supported bus network in terms of how it could
be reorganised to more efficiently connect with coach and rail services, particularly given the
opportunities presented by the Transport (Scotland) Act 2019. and alternative models of
provision such as Community or Demand Responsive Transport solutions.
8.2.7 Connecting services are of critical importance to our island communities as ferry and flight
passengers will only have a certain amount of time at their destination before their return trip.
Long waits or missed connections significantly reduce meaningful time at destination and can
on some occasions lead to a requirement for one or more costly overnight stays. This is
societally as well as financially important – for example, for children who board at
mainland (or island mainland) schools Sunday or Monday to Friday (e.g., Kirkwall Grammar,
Mallaig High, Oban High etc), there is a desire to maximise time at home at the weekend,
which assists with population retention.
8.2.8 One of the challenges with bus-ferry integration is that, if the ferry arrives late, the
connecting bus will often depart before ferry passengers have disembarked. This is because
the bus needs to maintain its other timetabled calls on the route (this is also an issue with
bus-air integration but is less prominent as the bus routes are generally much shorter and, in
some cases, will be dedicated services). One option would be to provide dedicated ‘ferry
buses’ which operate direct from the ferry terminal to a destination such as Inverness, Thurso
or Portree. These ‘ferry buses’ could either travel on the ferry on short crossings or meet the
ferry on longer crossings and could be provided by CT, DRT or EDRT services as well as
scheduled bus services. Good examples of this are local bus services in Orkney which are
timed to connect with inter-island ferry services for Rousay, Egilsay and Wyre and Hoy and
Flotta (albeit these are not specifically dedicated ‘ferry buses’).
8.2.9 There is also an issue around the certainty of getting a seat on the bus – some of the larger
ferries operating in our region can on occasion carry up to 1,000 passengers, and thus there is 
18 PlusBus is an add-on that can be bought in tandem with a train ticket to provide unlimited bus travel around the
whole urban area of the rail-served town or city.
Page 213

Page 214

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
69 
a risk that demand can overwhelm the capacity of a single bus or coach. In partnership with
Comhairle nan Eilean Siar, we have previously underwritten the cost of an additional coach
from Ullapool (which meets the ferry from Stornoway) over the summer to cater for whenever
bookings for the service exceed the bus capacity more than 48 hours in advance. Innovative
approaches such as this highlight how additional demand can be flexibly accommodated and
high-quality integration delivered.
8.2.10 Integration of rail and ferry timetables is more challenging, as timetable planning for both
modes (particularly rail) is constrained by infrastructure and operational parameters. However,
opportunities to retime ferry services to better connect with trains should be considered where
practicable. Similarly, the process of changing from ferry to rail and vice versa should be made
as simple as possible, particularly where a connecting journey is required such as between
Thurso and Scrabster (this is an example of a particularly poor interchange at present).
8.2.11 For our island communities in Orkney, it is important that inter-island air and ferry services
are well integrated with Loganair, NorthLink and Pentland Ferries connections to the Scottish
mainland. A particular consideration is the ability to make ‘same day’ connections to / from the
Scottish mainland (e.g., from Westray to Inverness), including early morning and late evening
arrivals and departures to / from the Scottish mainland, where practicable.
8.2.12 An important principle with respect to integration across all modes is integrated ticketing. At
its most basic, this entails cross-operator ticket acceptance or ‘combi’ tickets such as PlusBus
and ‘Rail and Sail’. However, creating a seamless transport network will ultimately require fare
capping or other such measures to reduce the cost of two or more fare trips, an issue
addressed in Strategy Theme 11.
Policy ST4a: The RTS supports measures that will improve integration within and
between modes of transport at key locations and transport interchanges in order to
provide new travel options and alternatives to the private car, recognising the
constraints within which this is possible (e.g., delivering school bus services).
Policy ST4b: The RTS supports integrated ticketing measures to simplify travel and
improve the passenger experience.
Policy ST4c: The RTS supports the adoption of contract conditions for tendered and
supported services that encourage operators to work in partnership to improve
integration, timetable planning and coordination.
8.3 Mobility hubs
8.3.1 The potential creation of a network of mobility hubs across our region provides an important
opportunity to improve, formalise and promote integration. Mobility hubs bring together shared
transport with public transport and active travel in spaces designed to improve the public
realm for all, supplemented by facilities such as EV charging points, bicycle parking and
repairs etc. and high-quality travel information. Other community services such as Wi-Fi,
parcel lockers and other urban realm improvements can also be provided. They offer a range
of benefits for the customer (including visibility, convenience, safety and accessibility),
transport providers and policy makers. There are already a number of mobility hubs in our
region, including at the University of the Highlands and Islands’ Inverness Campus. 
8.3.2 Mobility hubs should be co-located with major transport interchanges such as Inverness
Station, supplementing the role of high-frequency public transport within our settlements. They
can be developed in a range of settings, from city centres to rural areas and at differing scales
to suit local needs, which is particularly important in our region. Indeed, they provide a
potential opportunity to ‘rural proof’ the 20-minute neighbourhood concept. It is important that
local access to mobility hubs is facilitated by high quality active travel routes that enable safe
walking, wheeling and cycling.
Page 214

Page 215

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
70 
Case Study: Angus Rural Mobility Hub
Whilst there are many examples of mobility hubs across Europe, many of these are in urban
areas, either cities or large towns. Whilst such solutions offer great promise for settlements
such as Inverness, Elgin, Fort William etc, there is a wider question as to how this concept
can be applied to our rural areas.
The emerging Angus Council Rural Mobility Hub, which is being delivered as part of the Tay
Cities Deal provides an interesting example in this respect. The Rural Mobility Hub (RMH)
will be co-located with a new clean growth energy park in Brechin, just off the A90 which,
taken together, will integrate zero carbon energy systems with mobility services, enabling a
‘smart mobility infrastructure’.
Transport opportunities that will be explored as part of the RMH include EV charging
infrastructure; smart logistics solutions; EV car and fleet sharing; development of a digital
platform to enable rural active travel and automation capabilities; bus interchange; trialling of
on-demand public transport; micromobility connections (e-bikes and cargo bikes); changing
washing and locker facilities; and connectivity to public amenities through safe and sheltered
pedestrian and cycle routes.  This is a good example of how a mobility hub of some
considerable scale can be developed in a predominantly rural area.
https://investinangus.com/tay-cities-deal/the-angus-fund/low-carbon/angus-rural-mobility-
hub/ 
Policy ST4d: The RTS supports the provision and enhancement of mobility hubs across
the region, in line with a hierarchy reflecting local requirements.
8.4 Travelling with bicycles to and on public transport
8.4.1 Whilst cycling, alongside walking and wheeling, is at the top of the Sustainable Transport
Hierarchy, provision for cyclists at public transport interchanges is patchy outwith the main
settlements, whilst the public transport fleet used in our region is not always conducive to
carrying a bicycle (although foldable bicycles can be more readily accommodated). Moreover,
information on cycle parking, booking etc is often non-existent or out-of-date. Making it easier
to access public transport by bicycle is therefore important to improving the overall quality
of transport provision in our region.
8.4.2 The recent introduction of ‘active travel carriages’ to some West Highland Line services to
create the ScotRail Highland Explorer product are a good example of what can be achieved in
this area. These modified Class 153 units have 24 seats (20 seats around tables and four
airline style seat), with the rest of the vehicle given over to the carriage of 20 bicycles, sporting
equipment and large items of luggage. This is however a relatively short-term solution given
the age of these units. The real opportunity presents itself in the requirement for new rolling
stock over the next two decades, driven both by the requirement for decarbonisation and the
age of the current fleet. We will work with partners, including Scotland’s Railway, to influence
future rolling stock specification, and will make the case for a specific ‘rural’ unit
specification suited to our region. Carriage of
bicycles will be central to the case that we
make. 
8.4.3 We also recognise that, in many cases, cyclists
prefer to leave their bicycle at the station. The
provision of secure bicycle parking is therefore
important, particularly at the main commuter
stations such as Dingwall and Nairn. Given the
cost of bicycles, and particularly e-bicycles, this
should ideally be secure parking of the type
shown in the image inset.
Page 215

Page 216

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
71 
8.4.4 There is a wide range of bus vehicles in our region, from small minibuses through to large
coaches, and the ability to carry bicycles varies, although is generally very limited. We support
the provision of facilities for bicycles on buses and indeed our ‘Bikes on Buses’19 scheme
is a practical initiative to support integrated active travel and public transport journeys.
However, we also recognise that there are several practical challenges to this including space
and safety. To this end, we also call for the provision of new, extended or upgraded secure
bicycle parking at high volume bus stations / stops and in other key locations such as town
centres, major employment sites and transport interchanges, potentially as part of a wider
mobility hub arrangement (see Policy ST4d). 
8.4.5 Provision of facilities is of course only half of the solution. The process of taking a bicycle on a
train or bus or parking it at a station or stop can be problematic. For many journeys, it is not
possible to book carriage space or a secure bicycle parking space and thus uncertainty is
introduced into the journey. The provision of clear, correct and regularly updated
information is therefore essential, with new technology providing an opportunity to improve
the efficiency of booking and the provision to book your bike via the Scotrail app is a
welcome improvement.
Policy ST4e: The RTS supports measures which will enable people to leave their bicycle
in a secure environment at a bus stop / station, railway station, ferry terminal or
airfield.
Policy ST4f: The RTS supports, where practical, the provision of increased bicycle
capacity on public transport services within the region.
Policy ST4g: The RTS supports the simplification of the process of taking a bicycle both
to and onto a bus or train. 
ST4h: The RTS supports more widespread journeys which combine bicycle and public
transport.
8.5 Access to and the quality of bus services
8.5.1 The sheer breadth of the bus network across our region means that there are also significant
differences in the quality of vehicles, bus stops, bus stations and the overall customer
experience. Raising the quality of bus services and making them fully accessible to all is
therefore an important component of an overall package of measures to facilitate and
encourage both more journeys by bus and mode switch to the bus.
8.5.2 At bus stops, improvements could include the provision of dropped kerbs; new sections of
footway to improve access; improved bus shelters, including provision of seating and up-to-
date travel information; and measures to improve security of passengers such as lighting20
and CCTV, particularly where anti-social behaviour is known to be a problem. As well as these
improvements, regional bus stations should incorporate appropriate high quality waiting
facilities such as real time information, a covered and seated waiting area and accessible toilet
facilities. In designing and delivering new bus station and bus stop infrastructure, it is
important that the most up-to-date equalities design guidance is followed. This may include
Inclusive Mobility, the Department for Transport’s best practice design guidance on access to
pedestrian and transport infrastructure, and Scottish guidance within which inclusive design
principles are incorporated. 
19 The ‘Bikes on Buses’ scheme was introduced in 2021 and allows commuters and visitors to the region to take
their bikes on popular Highland bus routes.  A booking service is operated to guarantee a seat to accompany free
carriage of the bike - https://hitrans.org.uk/News/Story/1284 
20 Consideration would need to be given to what is appropriate, particularly in rural locations where excessive
lighting has potential to cause environmental and amenity disturbance.
Page 216

Page 217

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
72 
8.5.3 Improvements to the bus vehicle fleet will also be important, including the provision of a fully
accessible and comfortable fleet, well-trained drivers and mechanically sound vehicles. We
specifically recognise that many bus journeys to, from and within our region are of a long
duration, meaning that passengers experience significant dead time when travelling. It is our
aspiration that bus travel should enable meaningful working time through the provision of high-
quality seating, tables, Wi-Fi etc. 
Case Study: TrawsCymru
TrawsCymru is a medium-to-long
distance strategic bus network,
connecting major towns in Wales. The
network consists of a mix of longer
distance and shorter distance routes
and is funded by Welsh Government,
managed by Transport for Wales
(TfW), and delivered through seven
bus operators contracted by local
authorities.
The TrawsCymru network fills an
essential role in the overall public
transport network in Wales. The
geography and spatial distribution of the population means that, throughout much of the
country, the scope for the operation of commercial bus services is limited. TrawsCymru
therefore responds to the public transport connectivity challenges faced outwith the
metropolitan areas of Wales. In some respects, it acts like a long-distance coach service
connecting, for example, Newtown with Cardiff and Carmarthen with Aberystwyth. However,
there is a recognition that the TrawsCymru service may be the only bus service available to
certain communities and thus, unlike most express coach services, its stopping pattern will
connect local settlements along the route. Moreover, TrawsCymru generally complements
the railway network, either through:
 Providing a public transport connection where there is no direct railway line,
Barmouth to Wrexham for example.
 Providing bus-rail interchange opportunities, for example connecting the university
town of Lampeter to Aberystwyth and Carmarthen.
 Supplementing low frequency rail services, for example along the Conwy Valley
between Llandudno and Blaenau Ffestiniog.
This multi-faceted role as long-distance coach operator and ‘local’ bus service is essential in
providing public transport connectivity which would otherwise not exist, therefore reducing
car dependency and inequalities associated with ‘forced’ car ownership. Moreover,
TrawsCymru provides a consistent product for customers in terms of branding, vehicles,
accessibility, fares, certainty of supply etc, providing increased customer confidence and
also making it easier to use and more marketable to visitors. It also provides very high-
quality vehicles which are attractive to passengers making medium to long-distance trips –
amenities include tables, reliable wi-fi, the ability to carry luggage and foldable bikes and the
provision of comfortable seats. Importantly, integrated and discounted ticketing is offered
with selected TfW operated rail services, thus reducing cost significantly.
Page 217

Page 218

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
73 
Policy ST4i: The RTS supports the provision of consistent standards of facilities at bus
stations and bus stops reflecting location and usage.
Policy ST4j: Our bus network should be safe secure and fully accessible to all.
Policy ST4k: Our bus network should provide a high-quality and consistent onboard
experience.
Policy ST4l: Travel on buses to, from and within the region should, where possible,
enable meaningful working time. 
8.6 Access to and the quality of rail services
8.6.1 Relative to bus services, the passenger experience for rail passengers is typically much more
consistent and generally of a higher quality, although there remains scope to raise standards. 
8.6.2 Whilst our region offers some of the most
scenic rail journeys in the world (which are
popular with visitors as an attraction in their
own right), the quality of the on-train
experience is variable. Services on the
Highland Mainline and Aberdeen –
Inverness Line are often operated by Class
170 or 158 Diesel Multiple Unit stock more
suited to urban routes or shorter distance
regional routes or 1970s-built (although
significantly refurbished) High Speed Train
(HST) stock. On the West Highland Line and
Far North Line, services are operated by
1980s built Class 156 or 158 stock cascaded
from the Central Belt. These units,
particularly Class 156 trains, are not ideal for
the length of the journey and offer limited
space for bicycles, luggage etc. (although
the addition of modified Class 153s for cycle
carriage has addressed this issue on
selected services to some degree).
8.6.3 On train-provision in terms of e.g., catering,
toilets, wi-fi etc is often less than would
perhaps be expected given journey lengths and well below the standard found on ‘signature’
routes abroad. On certain units, the seats are not well-aligned with the windows, which means
that passengers cannot always fully appreciate the views, which for some is why they are
making the journey in the first place.
8.6.4 Providing a higher quality on-train experience for the passenger is an important element of
growing the customer base and encouraging mode shift to rail. Central to this will be the rolling
stock replacement over the next 10 years, and we have already stated our desire for a rural
unit specification suited to operating in our region. However, shorter-term improvements such
as improved on-train catering could also make a meaningful improvement to the passenger
experience.
8.6.5 Our region also incorporates a diverse set of railway stations, ranging from city and town
centre stations such as Inverness and Elgin to small unmanned rural halts such as Beasdale
and Scotscalder. By dint of this, facilities and manning levels also vary significantly. In most
cases, the level of facilities provided is proportionate to patronage. Nonetheless, facilities at
several stations are sub-optimal, particularly in terms of level access to both the platform and
Page 218

Page 219

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
74 
the trains. In addition, rural stations can also feel isolated and passengers can on occasion
have long waits with very limited facilities. Request to Stop machines at rural locations can
provide security through the provision of real time running information, in addition to the
performance and environmental benefits, and we would support further roll-out on Kyle and
West Highland routes. 
8.6.6 The key action required in relation to station improvements is to improve access for all,
particularly where there is no step free access to the station. The accessibility of all railway
stations is assigned to one of three categories, as follows:
 Category A: The station has step-free access to and between all platforms, at all times
trains are running, via level access, lifts or ramps
 Category B: The station does not meet Category A standards but has step-free access
to either all platforms or one platform
 Category C: The station has no step free access to any platform21   
8.6.7 Of the stations in our region:
 28% (21 stations) are Category A, although Nairn does not fall under this category and
is a particularly obvious outlier
 59% (44 stations) are Category B, although the access to many of these stations is over
rough and uneven ground unsuited to e.g., wheelchairs, mobility aids, prams etc.
 12% (9 stations) are Category C, including Bridge of Orchy, Crianlarich and Nairn22
8.6.8 In the immediate term, provision of information on where access to a station is not step free,
and advice on alternative arrangements continues to be essential. More generally, stations
would benefit from upgrades (e.g., waiting areas, customer toilets etc); continued high quality
station appearance, potentially through the Scotland’s Railway Station Adoption programme;
and a wider roll-out of the automated request stop kiosks which have recently been introduced
on the Far North Line.
Policy ST4m: The RTS supports the provision of more consistent standards of facilities at
railway stations, reflecting station usage.
Policy ST4n: Our railway network should be safe, secure and fully accessible to all.
Policy ST4o: The RTS supports the continuation and expansion of the Scotland’s
Railway Adoption Programme and other measures to enhance the station
environment.
8.7 Access to and the quality of ferry services
8.7.1 Some of the ferries around our region and the ports which accommodate them are old and fall
well below modern accessibility standards, their continued operation protected by ‘grandfather
rights’. This issue is perhaps most extreme on lift-on, lift-off routes in Orkney (Graemsay,
North Ronaldsay and Papa Westray) but can be found across the network. Passengers
regularly experience having to board ferries over steep gangways and linkspans and face
other obstacles onboard the vessels including steep stairs and door sills. 
21 Accessible Travel Policy – Guidance for Train and Station Operators (ORR, 2019), p. 46.
22 https://www.scotrail.co.uk/media/3504/download?inline 
Page 219

Page 220

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
75 
8.7.2 Passenger comfort on some routes (e.g., the CalMac Ferries Ltd Gourock – Dunoon route)
can be an issue for some, but it is generally a much less prevalent problem than physical
access.
8.7.3 These problems will be progressively resolved through the introduction of new tonnage and
port infrastructure which meets Equality Act 2010 requirements. However, options to improve
existing vessels through the introduction of lifts, ramps etc should also be explored.
Policy ST4p: Our ferry network should be safe, secure and fully and easily accessible to
all. This includes both shore-to-vessel access and movement around the vessel itself.
8.8 Access to inter-island air services
8.8.1 Inter-island air services in the Orkney Islands and Argyll and Bute are exclusively operated by
8-9 seat single pilot Britten-Norman Islander aircraft. These aircraft are ideally suited to the
operating environment in the Inner Hebrides and Orkney but are challenging to access for
Persons of Reduced Mobility – indeed, any passengers carried must be able to self-evacuate
the aircraft. This issue will however only be addressed through the long-term replacement of
the Islander aircraft, but there is not as yet an obvious candidate aircraft and thus this may be
a challenging point to resolve in the medium-term.
Policy ST4q: The RTS recognises that there is not a short-term solution to the
accessibility issues with the Argyll and Bute and Orkney inter-island air services. We will
keep abreast of developments in technology and new aircraft types and, in the
meantime, continue to work with partners to support alternative options such as the
Scottish Ambulance Service. 
8.9 Blue Badge parking
8.9.1 Whilst the RTS generally has a presumption against new parking provision, it is important that
an appropriate number of disabled parking bays are provided, particularly as our region’s
population is forecast to age. Disabled parking availability is of particular importance at
‘honeypot’ tourist locations if equitable access is to be enjoyed.
Policy ST4r: The RTS supports sufficient provision and better enforcement of Blue Badge
parking across the region.
8.10 Access to and the quality of taxi services
8.10.1 The taxi industry across our constituent authorities is commercial in nature, with Councils
fulfilling a licencing role. It is however an essential industry, providing connections to transport
interchange points such as railway stations, ferry terminals and airports / airfields, whilst also
providing essential connectivity where public transport is limited or non-existent. 
8.10.2 Recognising the importance of taxis in our region in facilitating essential journeys and filling
connectivity gaps, we support the continual development of the industry as a vital component
of the transport network. Of particular importance is increasing the number of fully accessible
taxis and ensuring a consistent taxi licencing and enforcement programme. However,
improvements in relation to customer experience and security would also be beneficial – these
could include, for example, the option of a text booking service for those with a hearing
impairment, training in customer care for drivers and increased in-vehicle CCTV coverage.
Page 220

Page 221

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
76 
Policy ST4s: The RTS recognises the important role of taxis as part of the overall
transport mix in the region. It supports partnership working with licencing authorities
and taxi providers to raise standards of provision where required and to facilitate the
expansion of the network. 
Policy ST4t: The RTS supports the provision of taxi services which are fully accessible in
terms of booking and vehicle access.
8.11 Supporting those less able to use our public transport network
8.11.1 Accessing public transport services can be difficult or impossible for some users because of
physical barriers. In addition, the tasks and experiences inherent in undertaking independent
public transport travel can also pose challenges for some, such as those with autism and
cognitive impairments, dementia for example. Such issues can be particularly significant for
island residents for whom the use of multiple modes of transport operating on irregular
timetables may be required. This results in people either choosing to travel by car or not
travelling at all which in turn can limit access to employment, education, and social
opportunities as well as key services. 
8.11.2 To ensure that all residents of our region can participate fully in society, we advocate
measures to support those less able to use our public transport network. These include, but
are not limited to: provision of accessibility / disability awareness training (including dementia
training) for drivers and other support staff, e.g., those working at railway stations, travel
centres etc; chaperoning services for vulnerable users; the provision of all online content in
accessible formats and ensuring that it is up-to-date; and the provision of all published
material in multiple formats (e.g., Braille, large print, different languages etc).
Policy ST4u: A key component of making travel accessible to all, the RTS supports
measures to remove barriers to travel, including increased staff training, passenger
chaperones and the provision of physical and online travel information in accessible
formats.
8.12 Improving public transport information
8.12.1 The range of modes (walking, wheeling, cycling, bus, rail, ferry and air), diversity of the
geography and the number of public transport operators across our region can make public
transport journeys difficult to understand and plan, particularly for visitors, who will be less
familiar with the area. 
8.12.2 It is essential that everyone has access
to the information that they need to be
able to plan and make journeys, and
enable them to make the right choice
for them when faced with a range of
what can be confusing travel options.
To be accessible to all, public transport
information should be available in a
wide range of formats including online
sources, dedicated apps, hard copy,
large print, braille and audio. 
8.12.3 It is particularly important that reliable
and up-to-date information is provided
at bus stops, railway stations and
transport interchanges. Where there has been investment in ‘screen’ based information, these
facilities need to be maintained and populated with meaningful information. At higher volume
Page 221

Page 222

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
77 
locations, this could include real-time information. However, as a minimum, physical timetable
information should be provided at bus stops, travel centres and community facilities (for those
without access to the internet). We will continue to work with partner councils and local bus
operators to improve the quality and consistency of information provision at transport nodes
across the region. 
8.12.4 Apps have also become a prominent feature of journey planning and making – in many
respects, they have transformed journeys by instantly providing real-time information within
and across modes. However, there are plethora of such apps and some are more useful than
others, and this can be bewildering for occasional users and visitors. It is important therefore
that there is a consistency of information between apps and that customers know where to
look for information, particularly visitors to our region. Our GO-HI has an important role to play
in this respect. 
Case Study: GO-HI App
Go-HI is a groundbreaking Mobility-as-a-Service (MaaS) platform, which we launched in
June 2021. Its aim is to improve accessibility to integrated transport services for residents,
tourists and business travellers in our region and beyond.
The free-to-use app integrates multiple transport and travel options into one platform,
providing more reliable journey planning capabilities, easier access to travel information, in-
app ticketing and a hassle-free payment system. GO-HI has integrated API data feeds to
enable passengers to plan book and pay for travel by air, bus, coach, car club, ferry, folding
bike, e-Bike and train.
GO-HI has been developed with support from Transport Scotland’s MaaS (Mobility-as-a-
Service) Investment Fund. The Fund’s aim is to test, in a practical application, the viability of
MaaS in Scotland. 
The success of the app was recognised in 2023 with awards for innovation at the Transport
Times Scottish Transport Awards, SCDI Business Awards and CiTTi Magazine awards.
Policy ST4v: The RTS supports the maintenance and expansion of at-stop / at-station
multi-modal real-time information.
Policy ST4w: The RTS promotes the simplification and consolidation of travel planning
and in-journey information to make travel easier for less frequent users.
Policy ST4x: The RTS supports the further development of the GO-HI travel app.
Policy ST4y: The RTS supports the provision of up-to-date physical travel information at
bus stops, and the removal of out-of-date information.
8.13 Improving digital coverage in our region
8.13.1 Over the last decade, digital connectivity has assumed an increasingly prominent role in
transport and travel. From a customer perspective, this has taken the form of web and app-
based travel information, electronic ticketing (e.g., smartcards, mobile tickets, car parking etc)
and technologies such as Apple Car Play. For transport providers, the provision of travel
information and ticket retailing has significantly shifted towards digital media, whilst wireless
technology has become operationally essential, e.g., bus ticket machines. 
8.13.2 In order to take advantage of the opportunities offered, high-quality digital connectivity is
essential, including 4G / 5G coverage, adequate broadband speeds and DAB radio signal. By
dint of its rural nature and sparse population, digital coverage across our region varies
enormously. Whilst not directly a transport issue, patchy digital connectivity will limit the
benefits of modern technology in the region including the delivery of e.g., online health
Page 222

Page 223

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
78 
appointments, and will cause inequalities and social exclusion where connectivity is at its
poorest.
Case Study: Scottish 4G Infill Programme 
The Scottish 4G Infill (S4GI) programme is a joint Scottish Government and European
Regional Development Fund investment to expand 4G coverage in 55 mobile ‘notspots’
(many of which are in our region) through the erection of phone masts. The project was
completed by the end of 2023, with mobile network operator EE providing 4G services
across all bar one of the new sites, although all sites are capable of supporting multiple
operators in the future.
The S4GI programme has provided members of the 55 affected communities with a
transformational improvement in their digital connectivity. From a transport perspective,
residents of these communities can now access websites and apps that they could not
previously, facilitating e.g., ticket booking, journey planning, live journey update information
etc. Digital connectivity is also vital for the operation and maintenance of EV charging points.
Policy ST4z: The RTS Calls for improved cross-provider digital connectivity across the
region to facilitate access to travel information for all (including in-car information),
enable meaningful working time when travelling by public transport and to help
reduce the need to travel where possible.
8.14 How does this Strategy Theme contribute to our RTS Objectives?
8.14.1 The table below summarises how this Strategy Theme contributes to our RTS Objectives:
Table 8.1: Contribution of Strategy Theme 4 to our RTS Objectives
RTS Strategy Objectives 
SO1: To make a just transition to a post-carbon and more environmentally sustainable
transport network 
SO2: To transform and provide safe and accessible connections between and within our
city, towns and villages, to enable walking, wheeling and cycling for all O
SO3: To widen access to public and shared transport and improve connectivity within and
to / from the region 
SO4: To improve the quality and integration of public and shared transport within and from
/ to the region 
SO5: To ensure reliable, resilient, affordable and sustainable connectivity for all from / to
our island, peninsular and remote communities 
SO6: To improve the efficiency, safety and resilience of our transport networks for people
and freight and adapt to the impacts of climate change. O
8.14.2 High quality and well-integrated public and shared transport is at the heart of our approach to
achieving a just transition to a post-carbon and more environmentally sustainable transport
network (SO1). Enhancing connectivity is good and well, but many journeys in our region
require interchange within and between modes and are also very long. Seamless integration
and a high-quality waiting and on-vehicle experience, including the ability to undertake
meaningful work, is therefore integral to encouraging journeys by public transport. This
Strategy Theme therefore strongly supports SO3 and SO4. 
8.14.3 For those living in our island communities, all journeys consist of at least three legs – i.e.,
travel to the ferry terminal / airport; the journey on the ferry or aircraft; and an onward journey
to a final destination. Moreover, these journeys are often time constrained, with a requirement
to make a return connection to the island, either on the same day or a different day. For those
travelling without a car, seamless and reliable integration between modes is essential in
Page 223

Page 224

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
79 
maximising meaningful time at the ultimate destination. This Strategy Theme therefore
supports SO5.   
Page 224

Page 225

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
80 
9 Strategy Theme 5: Providing connectivity that
supports our island and peninsular communities
9.1 Overview
9.1.1 A unique feature of our region that sets it apart from almost all others in the United Kingdom is
the number of island and peninsular communities contained within it, over 50 in total. Indeed,
two of our constituent members – Comhairle nan Eilean Siar and Orkney Islands Council – are
wholly island authorities, whilst the Moray Council area is the only part of our region with no
island or peninsular communities.
9.1.2 The number of island and peninsular communities in our region is however just a small part of
the story. This grouping of communities is often thought of, referred to and planned for as a
single homogenous entity, with islands treated in the generality. These communities are
however extremely diverse in terms of population size, economic structure, culture and
history. For example, Islay’s prominence in the Scotch whisky industry means that it has an
industrial and export-focused economy whereas, at the other end of the scale, communities
such as North Uist and Graemsay are predominantly focused on crofting. Our RTS specifically
recognises for this point – whilst it defines overarching policies for island and peninsular
communities, it explicitly recognises that the actions required to deliver these policies may
vary by community.
9.1.3 Common across all these communities is the key role of ferry services, and in some cases air
services, in facilitating travel for business, health, education, tourism and the functioning of
supply-chains. However, with regards to ferry services, the absence of new ferries in recent
years means that severe reliability, capacity and resilience issues have emerged, and these
are having detrimental impacts on some of our communities. In addition, a shortage of ferries
and funding pressures mean that the level of connectivity offered is often not meeting the
needs of our communities. These problems are set against the wider backdrop of the
requirement to decarbonise the ferry fleets in our region. 
9.1.4 The geography and topography of our region means that aviation has a key role to play in
reducing peripherality, both in terms of strengthening existing routes and considering how the
network could be expanded to connect other communities.
9.1.5 One way in which the connectivity of island and peninsular communities has historically been
improved in our region is through fixed links, significantly reducing journey times between
communities. This has included fixed links across major river firths (e.g., Moray, Cromarty and
Dornoch), between island communities and the Scottish mainland (e.g., Skye) and between
islands (e.g., Scalpay to Harris). Fixed links have the potential to transform the economic and
social structure of communities, offering many benefits, although also increasing the risk of
loss of local identity and the centralisation of services. Given the recent ferry-related resilience
and cost challenges, the potential of fixed links as means of transforming connectivity in our
region must be considered.      
9.1.6 This Strategy Theme is therefore focused on improving the connectivity and reducing the
peripherality of island and peninsular communities through improved ferry and air services,
and potentially fixed links.
9.1.7 The figure below sets out the policy areas covered under this theme:  
Page 225

Page 226

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
81 
Figure 9.1: Strategy Theme 5 – policy areas
9.2 Connectivity of island and peninsular communities
9.2.1 The concept of ‘connectivity’ in relation to public transport was introduced under Strategy
Theme 3. To recap, there are three components to this:
 Network geographical coverage: The bus, community and demand responsive
transport, rail, ferry and air services that collectively form a network of connections for our
communities
 Timetables / connections: The number of days on which a service operates, the
frequency at which it operates and the time of the first and last service
 Journey times and journey time reliability: How long the journey takes, including the
time on-vehicle and ‘door-to-door’ journey time, and the extent to which the service turns-
up and arrives on time
9.2.2 In the context of ferry services, there is an additional dimension to this, namely their role in
meeting the service delivery, visitor and inbound and outbound supply-chain and service
delivery needs of communities. These needs often necessitate a different set of service
requirements. For most resident travel, the desire is for an early service off-island and late
evening return, maximising the time on mainland. Conversely, supply-chains are often
(although not always) orientated around early morning arrivals into an island and a late
evening or even overnight sailing off-island to tie into logistics hubs in Inverness and the
Central Belt. The delivery of services, such as visiting health professionals, itinerant teacher
cover, utilities providers etc, generally requires a timetable that facilitates a half-day or
working-day on island. 
9.2.3 A feature of many ferry services is their use by visitors – many routes experience a significant
summer / winter variation in demand. For example, in calendar year 2022, CalMac carrying
statistics show that 76% of all passengers who travelled on the Oban – Craignure route did so
in five months between April and September (with 30% in July and August alone). Much of this
visitor demand is also clustered around certain days (e.g., Saturday) and sailings. This
Connectivity of
island and
peninsular
communities
Booking and
ticketing
arrangements
Managing
capacity on ferry
services
Modernising ferry
fleets and
infrastructure
Converting Lo-Lo
routes to Ro-Ro
Air network
coverage
Inter-island air
services Fixed links
Page 226

Page 227

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
82 
seasonality is a common feature on many island archipelagos across Europe such as in
Norway, Denmark and Greece.
9.2.4 Meeting the sometimes competing connectivity needs of residents, visitors, service providers
and the supply-chain is challenging. Whilst most islands have a daily connection to and from
the Scottish or ‘island’ mainland (e.g., Orkney Mainland), it is in many cases not a ‘meaningful’
connection in terms of allowing the desired activities to be undertaken in a day. The term
‘meaningful’ varies by island type – for example, for islands close to the mainland, this may be
a service which facilitates commuting to employment or education whilst, for more distant
islands, this may be the ability to travel for a medical appointment, a tradesperson visit or to
undertake a shopping trip and return on the same day.
9.2.5 The absence of ‘meaningful’ time on-mainland and / or on-island can constrain an island
economy and society or increase the cost of doing business or providing services there. For
example, it is not possible for a fuel supplier to make a meaningful day return trip to some
islands in the winter months as the last ferry departure leaves 30-45 minutes after the first
arrival. This leads to significant standing time for the vehicle and potentially the driver, and
cost to the business / customer. Similarly, residents of Colonsay cannot make a day-return trip
to Oban on all days, meaning an overnight stay is required when such trips are made.
9.2.6 Our aspiration over this RTS period is therefore to work towards a ‘meaningful’ day on-
mainland and on-island for island communities across our region (this is less of an issue for
peninsular communities). There are some short-term measures which could assist this
including: 
 Operating additional services with existing vessels. This would though require an
increase in crew complement, which presents its own challenges in terms of recruitment
and, for vessel-based crew, accommodating them. The impact of additional sailings on
reliability and resilience would also have to be considered.
 Deployment of additional charter vessels to supplement the existing fleet – there is
precedent for this with the summer deployment of MV Alfred on the Arran run and the
repeated deployment of MV Arrow on the Stornoway – Ullapool and Aberdeen – Kirkwall /
Lerwick routes. The scarcity of suitable vessels, especially for short-term charter, and the
cost of such charters mean that this can only ever be a stop-gap option.
 Timetable amendments, particularly where it would allow a vessel to be based on-island
(or at either side of a crossing when there are two vessels, e.g., Bute)
 Working with commercial airlines to provide the necessary connectivity, albeit it is
of a different nature to that offered by ferry services 
9.2.7 Whilst the above options could assist in progressing towards a meaningful day on-mainland
and on-island, the scope for any major expansion of services is limited significantly by the
number of available vessels and crew, as well as the cost of operating such services. The
ultimate realisation of this aspiration will require both infrastructure investment, and additional
revenue funding / human resource. 
9.2.8 An issue facing a number of communities is the absence of seven-day connectivity
(primarily in the winter months) or a reduction in Sunday connectivity to the extent that it does
not allow meaningful return journeys to be made. There is also no winter service on some
routes (e.g., Nigg – Cromarty) or a much-diminished winter service (e.g., Mallaig –
Armadale and Mallaig – Small Isles). A further variation of this is the refit ferry timetable for
the Orkney Outer North Isles, which leads to a significant diminution in connectivity. The
absence of a connection on one or more days a week can be highly detrimental to an island
community, requiring overnight stays when a return journey cannot be completed in a day or
the service is disrupted. For some islands, this is difficult to resolve within the current
resources. However, for other islands, the reduction in connectivity is due to low demand and
the high-cost of operating the service. Whilst we acknowledge that additional services would
Page 227

Page 228

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
83 
operate at a deficit, delivering seven-day connectivity by ferry (and air where appropriate)
would be beneficial to communities.  
Policy ST5a: The RTS supports the provision of longer daily time on-mainland and on-
island where this is required for the long-term sustainability of a community.
Policy ST5b: The RTS supports the provision of services which minimise the requirement
for one or more overnight stays.
Policy ST5c: Where practicable, the RTS supports the operation of additional sailings
on the supported ferry networks within the region.
Policy ST5d: The RTS supports year-round seven-day connections for island and
peninsular communities where this is required for the long-term sustainability of a
community and enjoys public  support.
9.3 Booking and ticketing arrangements
9.3.1 The growing pressure on ferry vehicle deck capacity in the summer months, particularly on
parts of the CHFS network and in Orkney, means that the efficiency of the ferry booking
process and ticketing arrangements is becoming increasingly important. Whilst booking
and ticketing arrangements vary across Scotland, there is a general desire to see booking
systems opened earlier and for island residents to have access to more convenient ticketing
options, such as longer duration multi-journey books, increased use of mobile and electronic
ticketing and integrated ferry and rail / bus tickets. 
9.3.2 All ferry tickets are available on a first come, first served basis at present. A key issue
raised by island communities is that visitors typically plan much further ahead and therefore
often book the vehicle deck capacity on the most popular sailings early, leaving little or no
space for residents who may be travelling at shorter notice (albeit essential resident travel for
e.g., a funeral is almost always accommodated). There has been a longstanding debate as to
whether residents should be afforded a degree of priority and, at the time of writing, a trial is
underway in Mull, Coll and Tiree whereby a certain proportion of vehicle deck space is held
back in the booking system for local residents until 72 hours before departure. Other groups
such as freight customers also make the case for guaranteed space, and on some routes, this
is offered through block booking systems. 
9.3.3 The question of prioritisation and indeed general transparency and consistency around the
release and management of vehicle deck space on ferry services is one which needs to be
considered and resolved over the RTS period.
Page 228

Page 229

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
84 
Policy ST5e: The booking and ticketing arrangements for ferry services in the region
should support the convenience and efficiency of travel for all.
Policy ST5f: The RTS calls for the earlier opening of ferry booking systems and increased
transparency around the release and management of vehicle deck space.
9.4 Managing capacity on ferry services
9.4.1 A major pressure on ferry services
across our region is capacity. On
most routes, this relates to the
carriage of vehicles, whilst cabin
capacity can also be an issue on
the NorthLink Aberdeen – Kirkwall
– Lerwick route. With some limited
exceptions (e.g., certain sailings
on the Oban – Craignure route),
passenger capacity is almost
always sufficient. A particular
challenge for most ferry operators
in Scotland is adjusting supply to
reflect demand – winter carryings
are typically low and summer
carryings high, with some routes
such as Uig – Tarbert /
Lochmaddy, Oban – Craignure
and Houton – Lyness / Flotta experiencing pronounced summer peaks. 
9.4.2 However, despite public perceptions, capacity utilisation data highlights that, on most routes, it
is particular sailings or sailing days that are problematic, rather than capacity across the piece,
although this may not be the case during periods of service disruption, which have become far
more frequent in recent years. Addressing these issues through adding capacity is difficult in
the short-term - the fleet and crew that ferry operators in our region work with is largely fixed,
outwith some minor increments in crew to expand services and the occasional use of charter
vessels.
9.4.3 There are however opportunities to better manage the capacity on our ferry services, through
a combination of fares-based measures and the more efficient use of existing vessels.
9.4.4 At present, ferry fares on most routes are the same across the year and, with limited
exceptions such as the NorthLink seasonal fares. There is no use of pricing to manage
demand, as happens in parts of the railway and airline industries. There are very good
reasons for this, including the terms of operator contracts; the desire to maintain a simple
fares system; and to avoid generating inequalities for those who have little flexibility in their
choice of sailing. However, capacity constraints impose costs on our island communities, and
we support a position where price incentives are introduced to encourage off-peak travel.
This support is predicated on two conditions:
 No fares are increased for any community
 Any measures would need to be introduced manner that led to ‘no net detriment’ for the
operator, therefore implying additional subsidy
9.4.5 There are many different options for introducing price incentives to encourage off-peak travel
and these could vary by route, route group or network. Potential options include:
 Fares differentials to incentivise the use of quieter sailings by time of day or week
Page 229

Page 230

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
85 
 Fares differentials to incentivise foot-passenger travel rather than taking a car
onboard (although it should be noted that current ticketing systems do not differentiate
between foot passengers and passengers in a car, so this issue would have to be
resolved)
 Provision or extension of price incentives to move commercial traffic and potentially
unaccompanied cars on freight sailings (currently Aberdeen – Kirkwall / Lerwick or
Stornoway – Ullapool only)
 Provision of incentives to use an alternative route, e.g., Lochaline – Fishnish rather
than Oban – Craignure when travelling from Mull
 Specifically on the NIFS services, further promotion of the ‘land bridge’ offer on the
Stromness – Scrabster route to release space on Kirkwall – Aberdeen sailings
9.4.6 Price is course only one of the mechanisms that can be used to manage demand and capacity
– two other complimentary strategies can be pursued:
 Implementing measures to make more efficient use of existing capacity such as, for
example: improved management of block bookings; improved management of
commercial vehicles and motorhomes where they prevent the deployment of mezzanine
decks; advertised freight only sailings; and coordination of different traffic types to
minimise conflicts between users
 Providing better options for travelling without a car, including enhanced active travel,
public transport and shared mobility options for travelling to and from ferry terminals,
potentially allied with increased parking capacity at ferry terminals. This measure could
be reinforced through offering reduced or free passenger fares 
Policy ST5g: The RTS supports the principle of Road Equivalent Tariff (RET). However,
where service frequency permits, controlled use of peak times / surge pricing could
be used to help manage demand, recognising that this would need to be at no net
detriment to the connectivity of island and peninsular communities. 
Policy ST5h: The RTS supports operational measures which maximise the efficient
management of vehicle deck space on sailings.
Policy ST5i: The RTS supports measures to improve door-to-door journeys through
enhancing active travel, public transport and shared mobility connections to and
from ferry terminals, combined with other measures to reduce the need to take a car
onboard.
9.5 Modernising ferry fleets and infrastructure
9.5.1 The recent and well-publicised reliability problems on several Scottish ferry routes highlight
the need for new vessels. The ‘rule of thumb’ in relation to vessels operating in Scottish
waters is that they should be replaced when they are circa 30-years old. However, there are
now a considerable number of vessels which are older than this, with many others between 20
and 30 years old. Some networks, such as those operated by Orkney Islands Council23 and
Argyll & Bute Council have not seen a newbuild vessel introduced to their fleet this century,
and this is clearly not a sustainable position. 
9.5.2 Throughout 2023, the risks associated with depending on ageing vessels materialised.
Cancellations and vessel redeployments due to vessel breakdowns on the CHFS network
have been extensive, with communities suffering from the impacts of this – e.g., the service to 
23 It should though be noted that Orkney Ferries purchased the 2012-built passenger ferry MV Nordic Sea in April
2020 to operate the Pierowall to Papa Westray route, although there have been issues getting this vessel into
service.
Page 230

Page 231

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
86 
South Uist was withdrawn for an extended period; the busy Islay route was reduced to a single
vessel; and Colonsay could only be offered a very limited winter timetable. However, nowhere
have the impacts been felt more keenly than on the west side of the Corran Narrows. The
Corran Ferry is the busiest single vessel crossing in Europe but a technical fault with the main
vessel MV Corran and repeated breakdowns of the relief vessel MV Maid of Glencoul meant
that the vehicle carrying service was more or less suspended for a whole year.
9.5.3 Whilst there are several new vessels on order for CHFS network, on delivery of these the
average age of the fleet will remain relatively high. On local authority networks, there is no
new tonnage on order outwith a committed three-year pilot operation of two small passenger
only vessels in Orkney from 2024. Investment in new vessels over the RTS period is
therefore essential.
9.5.4 In our view, any vessel replacement programme must:
 Be informed by an overarching ‘Vessels and Infrastructure Planning Pipeline’ which
provides a robust and transparent evidence base to inform investment decisions and
priorities
 Be supported by a robust and objective business case informed by significant
community inputs, which clearly sets out how a preferred option has been arrived at.
Within this, there is a requirement to ensure that an objective approach to vessel
design characteristics is adopted
 Address the recent resilience issues which have so badly affected our island and
peninsular communities. Options to strengthen resilience include greater standardisation
of vessels and infrastructure to facilitate inter-changeability and building more rather
than larger vessels (i.e., providing capacity and resilience through increased frequency
rather than larger vessels). 
9.5.5 The future vessels strategy should look to provide increased capacity (e.g., vehicle deck,
sleeping accommodation etc) where required; improved passenger comfort, including access
for all; and reduced journey times where practicable (particularly in Orkney, where the
deployment of additional tonnage could support the splitting of indirect routes).
9.5.6 As vessels nominally have a service life of 30-years in Scottish water (and in reality much
longer), it is essential that investment in new tonnage has a strong focus on decarbonisation,
as even a new vessel introduced in 2024 would be in service long after the national 2045 net
zero target.
9.5.7 Investment in new vessels also provides an opportunity to adopt a more holistic approach to
asset planning. Investment in harbours (e.g., piers, linkspans, marshalling areas, terminal
buildings etc) will almost always be required to accommodate a new vessel. Many of the ports
around our region suffer from constraints associated with their spatial layout (and the
availability of space generally), draught, tidal conditions, bespoke infrastructure for a specific
vessel etc. This in turn causes reliability and resilience issues associated with e.g., the
inability to access ports in certain weather / wind conditions, delays to turnaround times,
limited diversion ports / ports of refuge.
9.5.8 Whilst enhanced preventative maintenance at harbours is always beneficial, it is in planning
for new vessels that major changes can be made, for example the forthcoming relocation of
Lochboisdale ferry terminal to the adjacent island of Gasaigh. It is essential that vessel and
harbour solutions are jointly progressed to deliver the optimum combination. This
should be informed by a robust and objective business case, which demonstrates how the
preferred option has been arrived at and how any particular port / route fits within the wider
network. Any business case should as a minimum consider opportunities for the
establishment of shorter crossings, where this is a practical proposition.     
Page 231

Page 232

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
87 
9.5.9 Ferry terminals are generally 60-year assets and there is again a requirement to ensure that
environmental considerations are at the forefront of investment planning. An issue of particular
importance here is ensuring that landside civil engineering works associated with new
vessels are minimised, so as to reduce embodied carbon and other environmental impacts.
This approach goes hand-in-hand with focusing on a larger fleet of smaller interchangeable
vessels.
Policy ST5j: The RTS recognises the long-term underfunding of vessels and infrastructure
in the region and strongly calls for fleet and infrastructure modernisation to address
issues of reliability and resilience.
Policy ST5k: The RTS calls for the development of a regularly maintained Vessels and
Infrastructure Planning Pipeline across all publicly supported ferry networks in Scotland.
Policy ST5l: The RTS supports an increase in the overall fleet size and the inter-
operability of that fleet and supporting infrastructure to strengthen resilience.
Policy ST5m: The RTS supports the principle of increasing capacity through frequency
rather than larger vessels.
Policy ST5n: The RTS calls for an objective consideration of the design characteristics of
future vessels for all routes, including hull form and the provision of crew
accommodation.
Policy ST5o: The RTS supports the introduction of new low or zero emissions vessels to
replace life-expired tonnage. This should be done in line with the NTS2 Sustainable
Investment Hierarchy.
Policy ST5p: With the vessel and infrastructure replacement cycle, the RTS supports
measures to reduce journey times for our island communities. This includes providing
direct sailings rather than via another island (where this is the preference of the local
community) and consideration of new ferry terminal locations that reduce crossing
distances.
Policy ST5q: The RTS supports harbour infrastructure improvements ahead of life expiry
where this could contribute to a material improvement in reliability.
9.6 Converting Lo-Lo routes to Ro-Ro
9.6.1 A small number of ferry routes in our region continue to operate on a lift-on, lift-off (Lo-Lo)
basis, where cargo and vehicles are craned or physically handled from the vessel onto the
quayside (and vice versa). This imposes limitations on the types of goods that can be moved
and also increases the costs of doing so by adopting what is now an outdated and inefficient
practice. 
9.6.2 The main islands which fall into this category are Graemsay, North Ronaldsay and Papa
Westray in the Orkney internal network. The latter two islands are also part of the Outer North
Isles mini-network of services and their Lo-Lo operations impose constraints on the other four
islands in that network (Eday, Sanday, Stronsay and Westray). Through their ‘Inter-Island
Transport Study’ business case work, Orkney Islands Council has confirmed the replacement
of Lo-Lo with Ro-Ro (roll on, roll off) on these islands as priority, subject to this being
acceptable to the communities. There are a small number of other island and peninsular
communities outwith the publicly supported network, such as Knoydart and Ulva, which are
also served in this way.
Page 232

Page 233

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
88 
9.6.3 An important consideration in any Lo-Lo to Ro-Ro conversion is ensuring that the change in
freight handling method does not lead to a significant increase in fares or the cost of moving
goods more generally.
Case Study: Converting the Small Isles from Lo-Lo to Ro-Ro
For generations, Scotland’s island communities were served by passenger ferries and
packet steamers, typically calling at multiple islands on a round-trip basis, conveyed people
and all goods to and from an island, operating on a Lo-Lo basis. On what is now the CHFS
network, Ro-Ro began to be introduced in the 1970s. By the 1990s, almost all CHFS routes
were operated by either slipway or linkspan Ro-Ro vessels. One of the few exceptions was
the group of four islands to the west of Mallaig – Canna, Eigg, Muck and Rum, the Small
Isles. 
The Small Isles were served by a traditional mail steamer, which was replaced in 1979 by a
Lo-Lo vessel specifically designed to meet the requirements of the route. Only Canna had its
own pier, so passengers and cargo were transferred onto small flit boats at each of the other
three islands. A round trip from Mallaig took 10 hours, in part due to time consuming Lo-Lo
operations and flit boat transfers at three of the four ports. 
Recognising the need to modernise the route, the Small Isles were converted to Ro-Ro in
2003. A new purpose-built vessel, the stern-loading MV Lochnevis, was procured at a cost of
£5.5m and entered service in 2000, reducing the round-trip journey time from 10-hours to 7-
hours. New slipways were built at Eigg, Muck and Rum. A new non-tidally constrained pier
was built at Canna and opened in 2006.  MV Lochnevis was also built to accommodate 14-
cars, but this was predominantly for her use as the winter vessel on the Mallaig – Armadale
route. An image of the vessel departing Mallaig is shown below: 
The impacts and benefits of the converting the Small Isles to Ro-Ro included:
Despite the limitations of serving four islands with a single vessel, by 2014, passenger
carryings were 59% higher than in 2003, increasing from circa 19,000 to 30,000 per annum.
Following a dip in 2015, the introduction of RET fares system took carryings back to around
Page 233

Page 234

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
89 
the 30,000 mark, where they remained until the pandemic. Car carryings also increased
significantly, from 334 cars in 2004 to 1,800 in 2019. The introduction of Ro-Ro effectively
facilitated meaningful car traffic for the first time. Ro-Ro significantly improved freight
handling on the route, with almost all freight moved on wheeled vehicles. Goods now often
arrive in much better condition and livestock can be moved on dedicated floats, improving
animal welfare. Project delivery on-island, such as the building and refurbishment of
properties has also become easier and cheaper. The delivery of services to the Small Isles,
including social care, has also become easier as it is possible to make a day return trip to
each island on certain days of the week.
Policy ST5r: The RTS supports the conversion of the remaining Lo-Lo routes in the region
to Ro-Ro where there is community support.
9.7 Air network coverage
9.7.1 Aviation is of critical importance to the cohesion of our region and its connectivity with the
Central Belt, London and further afield. It fulfils both an economic role (e.g., business travel)
and social role (e.g., connecting island residents to hospitals), mitigating the impact of
distance and reducing the geographic peripherality of many of our communities, and in
particular our island communities. 
9.7.2 With exception of the PSO services supported by Argyll & Bute Council and Orkney Islands
Council and a handful of longer distance PSO routes, most of the aviation network is operated
commercially. Whilst we, nor the public sector at large, cannot directly influence how these
routes are operated, we have always worked closely with airlines, particularly Loganair as the
most significant in the region in terms of network coverage. This is something which we will
continue to do over our RTS period, making the case for the operation of additional flights
and new / larger aircraft where appropriate. 
We will also continue to work
closely with partner
organisations that support
regional PSO routes - namely
Comhairle nan Eilean Siar
(Stornoway – Benbecula),
Transport Scotland (Barra, Tiree
and Campbeltown) and The
Highland Council (Wick John
O’Groats – Aberdeen) – to make
the case for additional flights
and capacity where required.
9.7.3 We will continue to explore the
case for the reinstatement or
development of new routes across the region, such as between Skye and Glasgow. In the
majority of cases, these would be PSO routes given that they have not been progressed
commercially to date. Just as importantly, we commit to working with partners to protect
existing routes which may be under threat or where the level of service may be diminished to
the extent that it adds little value. 
Policy ST5s: The RTS supports the further development of the Highlands and Islands’ air
network.
Policy ST5t: The RTS supports the further development of commercial external routes,
particularly to London Heathrow and other international hub airports, that support the
economic competitiveness of the region.
Page 234

Page 235

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
90 
Policy ST5u: The RTS supports the retention of the PSO air network within the region
and, where alternative travel choices are inadequate, its further expansion.
‘Adequate’ in this context refers to the ability to achieve an affordable daily return to
/ from a national centre.
9.8 Inter-island air services
9.8.1 Our inter-island air services in Argyll & Bute and Orkney provide essential connections for 10
islands, several of which are the amongst the most fragile and least populated in our region.
These services allow island residents to access employment, education and undertake
business trips. However, they are also integral to service delivery in the islands, including but
not limited to health provision, itinerant teacher cover, banking and veterinary care. 
9.8.2 The major challenge associated with these services is seat capacity, with the Britten-Norman
Islander aircraft only capable of carrying eight passengers, or occasionally nine if one
passenger sits next to the pilot. Many flights also serve more than one island in a single
‘rotation’ and capacity is therefore often a major constraining factor where there may be
double demand. The scope for introducing larger aircraft in the short-term or expanding the
number of flights operated by the current aircraft is very limited. However, Islander aircraft are
in plentiful supply and are relatively low cost to lease and operate – the deployment of
additional aircraft would increase capacity through expanding frequency and reduce the
number of indirect flights and the capacity issues associated with them.
9.8.3 The inter-island air services are also operated by a single pilot under Visual Flight Rules
(VFR), which effectively entails flying by line of sight. This impacts on service reliability as low
cloud cover, fog or darkness can lead to flights being cancelled, delayed or brought forward.
On some islands, this issue is exacerbated by their only being a single runway, increasing the
crosswind cancellation risk. 
9.8.4 There are a range of potential options for expanding the flying envelope including operating
under Instrument Flight Rules (IFR) or adopting satellite navigation aids. However, IFR flying
and the use of navigational aids would increase the cockpit workload and could necessitate a
second pilot, significantly increasing costs. Ground-based measures such as additional cross
runways and runway lighting are also options, although the experience of runway lighting in
North Ronaldsay to date has been far from positive. Whilst changing operational practices is
not without its challenges, it is important that opportunities to improve reliability and expand
the flying day for the benefit of our communities are continually explored.
Policy ST5v: The RTS supports the operation of additional connections and flights on
the PSO air networks within the region, whether delivered by existing, additional or
new low emission aircraft.
Policy ST5w: The RTS supports more direct flights rather than via another island.
Policy ST5x: The RTS supports the adoption of technological and infrastructure solutions
which would improve the reliability and frequency of inter-island air services.
9.9 Fixed links
9.9.1 One means of improving the connectivity of island and peninsular communities in the region is
through fixed link (bridges, causeways and tunnels). Over the last 50-years, the construction
of bridges and causeways (although not yet tunnels) has been instrumental in improving
connectivity in our region – these include the Kessock, Dornoch, Cromarty, Skye, Scalpay and
Kylesku bridges and the chain of causeways in the Outer Hebrides. There are three potential
opportunities in relation fixed links:
Page 235

Page 236

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
91 
 Island-to-mainland: there are several proposals of this nature, with a fixed link between
Mull and the mainland being included as recommendation in STPR2
 Island-to-island: Whilst there are fewer proposals in this category, those such as that to
connect Rousay with Egilsay in Orkney would offer efficiencies in the operation of ferry
services. Proposals for fixed links across the Sound of Harris and Sound of Barra were
also included as an recommendations in STPR2.
 Intra-mainland: These are fixed links which would cross major sea lochs or river firths –
there are several longstanding aspirations in this respect including at Corran and
Stromeferry, where there are existing proposals
9.9.2 It is essential that communities are
engaged in making the case for any fixed
link, with a view to ensuring that they are
fully informed of the benefits and
potential implications of providing such a
connection. This would include a
discussion around any implications for
future service delivery in an island or
peninsular community.
9.9.3 Given the high up-front costs of fixed
links and the challenges in developing a
value for money conventional business
case (even when considered in its
broadest sense), the case for tolling any prospective fixed link should be considered. Within
any such tolling regime, it is our expectation that residents of the island or peninsular
community would travel at a discount or for free with no delay to their journey, this
being enabled by the application of modern vehicle recognition technology.
9.9.4 We recognise that the replacement of a ferry by a fixed link could actually reduce connectivity
for those without access to a car. Indeed, it is possible that walking, wheeling and cycling
journeys could be prevented entirely in a situation where a tunnel is progressed. It is therefore
essential that any fixed link progressed is done so in conjunction with a high-quality public
transport offer which incorporates provision for cyclists.
Case Study: Fixed Links in the Faroe Islands
The Faroe Islands are a self-governing and autonomous nation within the Kingdom of
Denmark. The archipelago consists of 18 islands, 17 of which are inhabited. Its has a
population of 55,000, about 40% of which lives in the capital Tórshavn. As with many island
communities in our region, connectivity to the main settlement of Tórshavn on the island of
Streymoy and the airport on the island Vágar is essential. 
The Faroese have addressed the island connectivity challenge through a major programme
of fixed link building (predominantly tunnels), including four subsea tunnels, the most recent
of which – the Sandoy Tunnel, which connects Streymoy and Sandoy – opened in
December 2023.   
Tolls are charged on all subsea tunnels in the Faroe Islands and are used to pay for the
operation of the tunnels and repayment of the loans used to finance their construction. Island
residents benefit from discounted tolls based on subscriptions.
The tunnel network built in the Faroe Islands is considered to have been a major success
and is a great source of national pride. The subsea tunnels reduced journeys which
previously took a full day to just a few hours and thus more closely integrated the different
island communities which comprise the archipelago.
The fixed link network built in the Faroe Islands has supported population retention and
growth and has increased economic agglomeration between island communities. Research
Page 236

Page 237

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
92 
undertaken by Hokwerda (2017) also found that the subsea tunnels accelerated the process
of centralisation and urbanisation (which has its benefits and disbenefits); increased mobility;
dissolved spatial boundaries; and increased mutual dependency between villages and the
capital Tórshavn. 
https://www.faroeislands.fo/the-big-picture/ 
Policy ST5y: The RTS supports the principle of fixed links where they represent value for
money and are supported by the island or peninsular community. Any fixed link should
be implemented in conjunction with improved public transport connectivity and
incorporate provision for active travel.
Policy ST5z: The RTS supports the consideration of tolling where this would assist in
making the case for a fixed link. The use of vehicle number plate recognition
technology could allow local residents to travel for free.
9.10 How does this Strategy Theme contribute to our RTS Objectives?
9.10.1 The table below summarises how this Strategy Theme contributes to our RTS Objectives:
Table 9.1: Contribution of Strategy Theme 5 to our RTS Objectives
RTS Strategy Objectives 
SO1: To make a just transition to a post-carbon and more environmentally sustainable
transport network 
SO2: To transform and provide safe and accessible connections between and within our
city, towns and villages, to enable walking, wheeling and cycling for all O
SO3: To widen access to public and shared transport and improve connectivity within and
to / from the region 
SO4: To improve the quality and integration of public and shared transport within and from
/ to the region 
SO5: To ensure reliable, resilient, affordable and sustainable connectivity for all from / to
our island, peninsular and remote communities 
SO6: To improve the efficiency, safety and resilience of our transport networks for people
and freight and adapt to the impacts of climate change. O
9.10.2 The central focus of this Strategy Theme is providing reliable, resilient and sustainable
connectivity for all from and to our island and peninsular communities. All of the policies listed
make a highly positive contribution to SO5. In addition, there is a strong focus on improving air
and ferry connectivity, both on existing and potential new routes, thus supporting SO3.
9.10.3 Given their long asset life, it is important that all new vessels are low or zero emission, and our
RTS includes a specific policy related to this (aviation decarbonisation is covered in Strategy
Theme 9). This Strategy Theme also identifies as a priority the need to ensure proportionate
harbour works to accommodate new tonnage, and in particular advocates a fleet of smaller
standardised vessels which will minimise landside infrastructure requirements. It therefore
supports SO1. 
9.10.4 This Strategy Theme also advocates addressing the barriers to travel faced by Persons of
Reduced Mobility, particularly in terms of making vessels and harbour infrastructure fully
accessible, thus supporting SO3. 
Page 237

Page 238

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
93 
10 Strategy Theme 6: Improving the efficiency of
transport networks and supply-chains and
reducing their impact on our communities
10.1 Overview
10.1.1 Our region is a major exporter, but many of our supply-chains are marginal (i.e., they only just
cover their costs) and face challenges not encountered elsewhere in Scotland, working around
ferry connections for example. This means that the efficiency and environmental sustainability
of transport links with other parts of Scotland and beyond are as important as those within the
region itself.
10.1.2 This Strategy Theme is therefore concentrated on enhancing the efficiency of supply-chains
and identifying means for reducing the impact which they have on our communities. It focuses
specifically on ferry, other waterborne transport and rail-based supply-chains. Issues
related to road freight are addressed in Strategy Theme 7. 
10.1.3 The figure below sets out the policy areas covered under this theme:   
Figure 10.1: Strategy Theme 6 – policy areas
10.2 Ferry freight capacity
10.2.1 Ferry freight is of critical importance to the functioning of our island communities. It is a multi-
faceted industry with different islands having different needs. In some communities such as
Gigha and Lismore, the need is predominantly related to the inbound supply-chain, whilst in
others such as Islay and Orkney Mainland, the freight industry must also meet high export
demand, in some cases clustered around specific peaks, such as livestock season in Orkney.
There are also several vessels on freight intensive routes which are restricted in terms of
weight, height, use of mezzanine decks and carriage of dangerous goods. This can be to the
disadvantage of both freight customers and car passengers.
Ferry freight capacity Ferry freight fares
Supporting the growth
in rail freight
Other waterborne
transport
Page 238

Page 239

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
94 
10.2.2 With vehicle deck capacity pressures on many routes, particularly in the summer months,
there is a frequent tension between deck space for personal vehicles and freight. We
recognise the importance of ferry freight in our region and support the case for additional
capacity for the carriage of freight.  
10.2.3 In the medium-term, the demand for freight capacity can best be met through the introduction
of new vessels, as outlined in Strategy Theme 5. As part of the overall planning for and
prioritising of new tonnage, it is important that the requirements of the freight industry in each
island are fully understood and that a forward look is taken on any major projects (e.g., new
hospital buildings, windfarms etc) or emerging / evolving industries (e.g., the expansion of the
green hydrogen industry in Shapinsay and Eday) that could impact demand for the movement
of commercial vehicles. Vessel design requirements should reflect this, and it may be that
there is a case for dedicated freight vessels, as operate on the Aberdeen – Kirkwall / Lerwick
route or ‘freight plus’24 vessels. 
10.2.4 In the immediate term, there is a case for considering how existing capacity can be more
efficiently managed to provide additional capacity for freight. Options in this respect are
largely captured by RTS policies 5g and 5i, which consider how pricing flexibility and
operational changes can support improved demand management overall. However, one
freight specific measure which could be progressed is the formalisation and extension of
the carriage of unaccompanied trailers to a wider range of routes, which would reduce the
lane meterage consumed by commercial vehicles. At present, unaccompanied trailers are
formally carried (i.e., operator managed) on the Stornoway – Ullapool overnight freight service
and NorthLink services, whilst more informal arrangements (i.e., haulier managed) are in
place on the Port Ellen – Kennacraig route. Expansion of this practice provides an opportunity
to reduce capacity pressures on busy routes, but any potential impact on turnaround times
would need to be considered on a route-by-route basis.   
10.2.5 Where ferry freight capacity is particularly pressured, there is a case for considering the
operation of dedicated freight sailings year-round or for short periods (e.g., to
accommodate livestock season in Orkney). This could be done using existing vessels (as per
the practice with MV Loch Seaforth on Stornoway – Ullapool), charter vessels (e.g., as per the
frequent charter of MV Arrow) or commercially where such a market exists.
Policy ST6a: The RTS supports the principle of new dedicated or high-capacity freight
vessels on freight intensive routes.
Policy ST6b: The RTS supports the formalisation and extension of the carriage of
unaccompanied trailers to a wider range of routes.
Policy ST6c: The RTS supports the operation of dedicated freight sailings, either by
contracted or commercial operators where there is demand and it is operationally
deliverable.
10.3 Ferry freight fares
10.3.1 The approach to the setting of ferry freight fares on most publicly supported networks in
Scotland is inconsistent, archaic and, in many cases, simply born of history. There are
significant inconsistencies even within networks in terms of the basis of the charge and the
absolute tariff level, whilst there are a multitude of discounts and surcharges that apply to
individual routes or small bundles of routes. This creates inefficiencies in the movement of
freight, the commercial viability of some of which is already marginal, and inequalities between
islands. 
24 These are predominantly freight vessels but with some passenger and car carrying capacity.
Page 239

Page 240

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
95 
10.3.2 Transport Scotland recognised this issue and undertook a Ferry Freight Fares Review (FFFR)
in 2014-15 for the Clyde and Hebrides and Northern Isles networks. However, the major
challenge emerging from this review was that, to provide consistency across the network,
either: (i) significant additional subsidy would be required to reduce all fares to the lowest
common denominator; or (ii) to achieve revenue neutrality, some fares would need to go up to
compensate for others going down. Hauliers evidently consider absolute costs in relation each
route that they serve (i.e., comparative fares between routes are less important), so the risk of
increasing fares for some islands is that some commodities may no longer be shipped, or
indeed the haulier could stop serving the island altogether. However, the subsidy impact of
reducing fares to the lowest common denominator is also significant. The FFFR has not
progressed further although a commitment to it has been confirmed in Transport Scotland’s
Fair Fares Review25. Constituent local authorities within our region have also undertaken
wider ferry fares reviews but have not progressed these beyond concept stage.
10.3.3 Whilst this is an undeniably complex issue, it is important that it is resolved, either through
progressing with a new fares system(s) or accepting the inbuilt inequalities and
inconsistencies within the current framework. 
Policy ST6d: The RTS supports moves towards greater simplification and consistency in
the setting of ferry freight fares across the region, recognising that this would be
achieved over the medium-term.
10.4 Supporting the growth in rail freight
10.4.1 Growth in rail freight offers significant opportunities for our region, either delivered
commercially or in support or major new developments such as the Cromarty Firth Green
Freeport. A key societal benefit offered by rail freight is reducing the number of HGV journeys
– this would be a particular benefit in our region where HGVs extend journey times and
increase driver frustration on our predominantly single carriageway roads. They also emit
significant carbon dioxide and have a disproportionately negative effect on the condition of our
road network. Moreover, rail freight is well-suited to handling bulk and homogenous products
such as timber, bulk liquids and waste, which are features of our region’s supply-chain. 
10.4.2 Supporting the growth in rail freight will require enabling investment in services and facilities,
including improved route availability; improved gauge clearance; new rail freight terminals;
improvements to the efficiency of existing rail freight terminals; longer passing loops for larger
freight trains; procurement of adapted wagons to run on our region’s network; and new
connections to emerging industrial sites.
Policy ST6e: The RTS supports infrastructure measures which will enable the growth of
rail freight to and from the region.
10.5 Other freight transport
10.5.1 Our region features a long coastline, dozens of ports and harbours, deep sea lochs and inland
waterways, all of which offer opportunities for waterborne freight transport. Indeed, the super
quarry at Glensanda on the western shore of Loch Linnhe has been in operation for almost
40-years, moves all quarried rock by sea, and is an example of the scope for waterborne
freight movements in our region.
10.5.2 Waterborne transport provides an important opportunity to remove commercial vehicle
kilometres from our region’s roads (and in, some cases, ferries) in two ways: 
25 https://www.transport.gov.scot/our-approach/strategy/fair-fares-
review/#:~:text=The%20Fair%20Fares%20Review%20aims,across%20government%2C%20business%20and%2
0society.
Page 240

Page 241

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
96 
 Taking materials to site and removing waste associated with major new construction
projects located adjacent to waterways, for example the proposed Coire Glas pumped
hydro storage scheme (which is adjacent to Loch Lochy and the Caledonian Canal)
 Handling the routine movement of bulk commodities, for example the import of grain
for the Diageo maltings at Port Ellen by the bulk coaster MV Victress
10.5.3 Our region’s coast and waterways are therefore under-used assets and we support both the
expansion of waterborne transport on a commercial basis and via government-based
incentives such as the Freight Facilities Grant.
10.5.4 Key technical developments are also taking place to accelerate the use and efficiency of
amphibious aircrafts, including zero-emission power technologies for use in salt-water
environments. here are several emerging aviation technologies that will improve efficiency and
environmental sustainability, as well as support connectivity across the HITRANS region.
Advancements in heavy-lift autonomous drones, airships and seaplanes provide an
opportunity to improve freight and logistics services whilst reducing the carbon impact of
operations. The Sustainable Aviation Test Environment (SATE), established through Innovate
UK’s Future Flight Challenge, could offer a long-term test environment to facilitate trials with a
range of these technologies to encourage future adoption.
Case Study - Scottish Timber Transport Scheme
In recent years the Scottish Timber Transport Scheme (STTS) managed by Scottish
Forestry (SF) has provided significant funding for projects in the Highlands and Islands. The
STTS funding supported with additional funds from both the private sector and the Highland
Council have help move timber along fragile road networks and through sensitive
communities. 
Since 2021, 15 projects totalling £6.9m have been funded in Highland, including £915,000
on the A897 Helmsdale-Melvich, £1.05m on bridge replacement and other improvements at
Tomatin, the £150k construction of a pier to move land locked timber to market at Gorteon,
and bridge and other works at Loch Arkaig valued at £485k.
STTS also funds TimberLINK which ships up to 100,000 tonnes of timber a year from Argyll
to mills in Ayrshire, avoiding around 8,000 lorry journeys on the A83. Since 2000, the
TimberLINK service has shipped 2m tonnes of timber, saving 42k tonnes of CO2 emissions.
STTS shows the way forward for partnership working, enabling timber resource to be
harvested while improving fragile infrastructure for all users.
Policy ST6f: The RTS supports infrastructure investment and funding initiatives which will
enable the growth of waterborne and air freight to, from and within the region.
10.6 How does this Strategy Theme contribute to our RTS Objectives?
10.6.1 The table below summarises how this Strategy Theme contributes to our RTS Objectives:
Table 10.1: Contribution of Strategy Theme 6 to our RTS Objectives
RTS Strategy Objectives 
SO1: To make a just transition to a post-carbon and more environmentally sustainable
transport network 
SO2: To transform and provide safe and accessible connections between and within our
city, towns and villages, to enable walking, wheeling and cycling for all O
SO3: To widen access to public and shared transport and improve connectivity within and
to / from the region O
Page 241

Page 242

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
97 
RTS Strategy Objectives 
SO4: To improve the quality and integration of public and shared transport within and from
/ to the region O
SO5: To ensure reliable, resilient, affordable and sustainable connectivity for all from / to
our island, peninsular and remote communities 
SO6: To improve the efficiency, safety and resilience of our transport networks for people
and freight and adapt to the impacts of climate change. 
10.6.2 This Strategy Theme is predominantly focused on SO6 and will contribute strongly to
improving the efficiency of our ferry, rail and waterborne transport networks. By extension,
ferry-based measures will support our island and peninsular communities (SO5).
10.6.3 Shifting road-based freight to rail and water will also facilitate our aspiration to make a just
transition to a post-carbon and more environmentally sustainable transport network (SO1).
Page 242

Page 243

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
98 
11 Strategy Theme 7: Improving the safety,
reliability and resilience of our road and rail
networks
11.1 Overview
11.1.1 The extremes of geography, topography and weather together with limited road and rail
diversion routes mean that our region is singularly lacking in network resilience. Closures of
routes such as the A83 Rest and Be Thankful and A890 at Stromeferry can leave communities
with long diversion routes and with a sense of isolation. 
11.1.2 However, even at a day-to-day level, short-term road and rail closures can lead to lengthy
delays and diversions, whilst there is a significant backlog in road maintenance. (in March
2022, The Highland Council had a road maintenance backlog of £194m, whilst Argyll & Bute
had a backlog of £112m26). Similarly, the accident rate and severity of accidents on several
roads in the region is well in excess of the national average, a risk heightened by the large
summer visitor influx, many of whom will be driving our roads for the first time.
11.1.3 This Strategy Theme is therefore focused on improving the safety, reliability and resilience of
transport networks within the region. It should be noted that the focus is on road and rail, as
active travel is covered in Strategy Themes 1 and 2 and ferries and aviation in Strategy
Themes 5 and 6.
11.1.4 The figure below sets out the policy areas covered under this theme:   
Figure 11.1: Strategy Theme 7 – policy areas 
26 https://www.highwaysmagazine.co.uk/Scottish-local-road-backlog-close-to-1.7bn/9579 
Road-based
journey times
Network
resilience
Travel
disruption
information
Road
maintenance
Road safety Rail service
reliability
Page 243

Page 244

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
99 
11.2 Road-based journey times
11.2.1 The ‘Case for Change’ clearly demonstrated that road-based journey times within and to /
from our region are in most cases slow and unreliable. As well car journeys, this impacts
negatively on bus / coach journey time reliability and also the haulage industry, with its strict
regulations around driver hours.
11.2.2 Whilst policy has largely moved away from major road-building schemes, it is important to
recognise that there will be occasions where new / upgraded roads are required on the
basis of safety, congestion reduction in settlements and improved journey time reliability,
particularly for strategic freight movements. On our Trunk and major A-roads, investment
could include full or partial dualling; climbing lanes, overtaking opportunities and sections of
‘2+1’ in areas with poor accident records, low average speeds and poor journey time
reliability; junction improvements, Route Actions Plans to address known issues of e.g.,
geometry, gradient, width, improved forward visibility from vegetation clearance etc; and the
increase of HGV speed limits to 50mph as per the A9.
11.2.3 Single track roads account for a significant proportion of road kilometres in our region.
Indeed, several of the regionally significant roads connecting settlements such as the Outer
Hebrides Spinal Route through much of Harris, Uist and Barra and sections of the A848
between Salen and Craignure are of this form. Journey times on single track roads are slow
and variable, whilst the frequent stopping and starting consumes much more fuel, thus making
journeys more expensive and environmentally damaging, as well as being more demanding
on car maintenance. Adding and lengthening passing places and converting the busiest
single-track roads to single carriageway would therefore be positive in terms of safety,
connectivity, resilience and the environment.
Policy ST7a: The RTS restates our support for the full dualling of the A9 and A96, with
early prioritisation of the Elgin and Keith bypasses to dual carriageway standards,
following the already committed Inverness to Wester Hardmuir scheme.
Policy ST7b: The RTS calls for incremental improvements to our road network where
there are safety, efficiency and environmental benefits, including in relation to single
track roads.
Policy ST7c: The RTS supports the expansion of 50mph HGV speed limits across the
Trunk Road network in the region.
Policy ST7d: The RTS supports the provision of improved overtaking opportunities on our
roads, especially where there are known problems with vehicle platooning which can
cause driver frustration. 
11.3 Network resilience
11.3.1 The DfT describes transport system resilience as: 
 “The ability of the transport network to withstand the impacts of extreme weather, to
operate in the face of such weather and to recover promptly from its effects”.27  
11.3.2 The resilience of the transport network in our region is a major issue, one that is not
experienced to the same degree anywhere else in the United Kingdom. 
27 Transport Resilience Review – A review of the resilience of the transport network to extreme weather events
(DfT, 2014), p. 8.
Page 244

Page 245

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
100 
11.3.3 Our road network is particularly vulnerable to disruption due to a combination of severe
weather (e.g., snow), geological instability (e.g., A83 Rest and Be Thankful, A890 Stromeferry
etc) and flooding / sea level rises. This vulnerability to disruption is compounded by the length
and standard of diversions in the event of disruption. For many settlements in our region, the
terrain means that there is a dependence on only one road for travel e.g., north or south, even
for regional centres such as Fort William. This has led to these sections of the network being
defined as ‘lifeline’ in function, since their loss has such a significant impact on the impacted
communities that are cut off from the day-to-day amenities on which any community depends.
Diversions can take several hours and sometimes require a ferry crossing, such as when the
A83 Rest and Be Thankful or A830 west of Lochailort are closed. A good recent (2023)
example of this was the closure of the A816 in Argyll due to a landslide – a consequence of
this was that children in the village of Ardfern were unable to take the bus to Lochgilphead
High School and required a private boat transfer to Crinan to pick-up a school bus from there.
11.3.4 We recognise that the scale of this problem means that options to improve resilience are often
limited, for example on the A82 between Ballachulish and Fort William. However, we support
the exploration of options for emergency diversions equivalent to e.g., the Old Military Road at
the A83 Rest and Be Thankful and the use of Kyle Line for vehicles at Stromeferry.  In
addition, we call for permanent solutions where there is frequent and repeated disruption
leading to communities being cut-off for extended periods, most notably at the A83 Rest and
Be Thankful and the A890 at Stromeferry.
11.3.5 Like the road network, the railway network in our region is highly susceptible to
disruption due to weather and geological instability. Indeed, three sections of the West
Highland Line were damaged in June 2023 during heavy rain, with one of the sections having
to be rebuilt after 400 tonnes of material was swept away. Similarly, the Far North Line had to
be closed between Brora and Helmsdale in November 2023 when Storm Babet damaged the
sea wall. 
11.3.6 It is important that the safety and integrity of the railway network in our region continues to be
carefully monitored and that improvements are made to improve resilience, including regular
vegetation clearance.
11.3.7 More generally, it is essential that new transport infrastructure in our region is designed
to mitigate the impacts of climate change such as increased severe weather events and
flooding.
Case Study: A83, Rest and Be Thankful
The A83 is one of Scotland’s longest trunk roads, departing the A82 at Tarbet on the
western shore of Loch Lomond and running all of the way to Campbeltown in the Mull of
Kintyre. One of the most notorious stretches of this road is that between Ardgartan, located
just south-west of Arrochar, through Glen Croe to the Rest and Be Thankful, a viewpoint at
the head of then glen. 
This section of road has been affected by a series of major landslips in recent years,
requiring the use of the Old Military Road (OMR) (with associated delays) or creating an
additional 25-mile detour via Tyndrum (Tarbet to Inverary via Crianlarich and Dalmally).
More frequent severe weather events associated with climate change are exacerbating
these concerns. The resilience of the RaBT is a key issue for Argyll, and the Scottish
Government published the following data in response to an FoI request.
The level of disruption and uncertainty clearly affects communities and businesses which
rely on the RaBT. Transport Scotland is currently progressing plans to construct a
permanent solution to the issue.
A83 Rest and Be Thankful disruption (Source: FoI Request)
Page 245

Page 246

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
101 
Year
Days with
temporary
lights in
operation
No of Days
A83 RaBT
closed
No of days
OMR in
operation
No of nights
OMR in
operation
No. of days both
A83 RaBT & OMR
closed with
diversion route in
operation
2010/11 0 0 0 0 0
2011/12 0 5 0 0 5
2012/13 0 4.5 0 0 4.5
2013/14 0 6 5 5 1
2014/15 0 5 5 7 0
2015/16 0 5 3.5 0 1.5
2016/17 0 0 0 0 0
2017/18 155 0 0 0 0
2018/19 365 9 3.5 2 5.5
2019/20 309 2.5 2 2 0.5 
Policy ST7e: The RTS calls for investment in our regional road network where there are
regular and sustained periods of disruption due to weather and / or geological
instability.
Policy ST7f: The RTS recognises the increasing vulnerability of our region’s road network
to severe weather events linked to climate change and supports capital and revenue
measures to mitigate this.
Policy ST7g: The RTS recognises the increasing vulnerability of the railway network to
severe weather events linked to climate change and supports capital and revenue
measures to mitigate this.
11.4 Travel disruption information
11.4.1 Weather, geological instability, roadworks and accidents all having the potential to lead to
delays and diversions. Limited fuelling and EV charging infrastructure is also an issue for
those less familiar with the region or parts of it. In most cases, there is no diversion route
available, or the diversion is extremely lengthy, often on less suitable roads. These issues are
compounded by delays and cancellations to ferry services, which are effectively part of the
road network – a good example of this being the extended disruption to the Corran Ferry
service in 2022-23.
Page 246

Page 247

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
102 
11.4.2 A feature of this lack of diversion routes
is the requirement to provide reliable
and up-to-date travel information as
quickly as possible and at strategic
points on the road network. Intelligent
Transport Systems (ITS) and
information on websites such as Traffic
Scotland and the CalMac App is
essential, as is up-to-date social media
information. 
11.4.3 Given limited digital connectivity in
much of our region, traditional methods
of imparting information such as
Variable Messaging Signs (VMS) and
traffic cameras continue to be
necessary and important. This is
particularly the case at strategic points
on the network, e.g., at Tyndrum where
the A82 and A85 diverge. 
11.4.4 Where disruption is anticipated due to
e.g., planned roadworks, rail
replacement services or forecast bad
weather, it is important that this is
publicised to our communities in
advance. Expected disruption should
be publicised through a variety of media, including: formal sources where relevant (e.g., The
Scottish Road Works Register); public transport operator websites; the local press; and social
media, including apps such as GO-HI.
Policy ST7h: The RTS supports the continued provision and expansion of real-time travel
information for motorists and public transport users through existing and emerging
platforms.
11.5 Road maintenance
11.5.1 A combination of the size of our region together with the very low traffic flows on many roads
make prioritising and funding road maintenance difficult. This issue is heightened by the high
cost and logistical challenges of undertaking even routine maintenance in some islands and
our more remote communities. A consequence of this is that a significant length of the road
network is in a poor state of repair with potholes, degraded carriageways and damaged
verges to name but a handful of the problems. 
11.5.2 Improving the condition of our road network is an important element of our overall objective to
improve road safety in our region. Well maintained roads are also integral to the efficient
movement of people and goods around our region and influence the perception of it amongst
those visiting. Remedial work is therefore required to address known maintenance backlogs,
whilst the overall maintenance programme needs to be strengthened, something which we
recognise will require an increase in funding for both Transport Scotland (as the Trunk Roads
authority) and our local authority partners.
Page 247

Page 248

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
103 
Policy ST7i: The RTS recognises that many parts of our region’s road network are in
poor condition. It calls for enhanced preventative and remedial road maintenance to
ensure the safe, reliable and efficient movement of people and goods and the
delivery of services across our region. 
11.6 Road safety
11.6.1 Road safety in our region is a long-term issue of public concern and regularly features
prominently in both the local and national press. Rural routes, which are prevalent in our
region, typically tend to have higher rates of fatal and serious accidents than urban roads and
motorways. This trend is however amplified in our region by the long duration of many
journeys undertaken, a significant length of single-track roads and the seasonal influx of
visitors, a subset of whom do not speak English as a first language and will be driving left-
hand drive vehicles.  
11.6.2 The long-term trend at the regional level has been positive, with the total number of accidents
reducing by around half since 2000. Nevertheless, in 2019, there were 39 fatalities and 264
serious injuries on our region’s roads.28 In absolute terms, the route sections with the
greatest number of accidents are the A9 Perth – Inverness; the A83 Tarbet – Campbeltown;
and the A96 Inverness – Keith. We share and support the Scottish Government’s ambitious
vision for Scotland to have the best road safety performance in the world by 2030 and the
long-term goal where no one is seriously injured or killed on our roads by 2050.29 We still have
some way to go to meet these targets in our region and thus our RTS calls for measures to
improve regional road safety.
11.6.3 There are a range of measures which could be implemented to support this, including:
 Road improvements such as addressing sections of poorly aligned carriageway,
converting single track roads to single carriageway where appropriate etc, particularly
where there are known safety problems
 Increased HGV-specific and general motorist rest areas / services, particularly on
strategic long-distance routes such as the A9, A96 and A82 etc.
 Improvement or removal of priority junctions on higher speed roads, particularly for
right turning traffic
 The wider roll-out of average speed cameras
 Ongoing public information campaigns around the use of single track roads,
promoted in partnership with local authorities, ferry operators, airlines, HIAL and car hire
companies
 Increased advisory signage (including multi-lingual signage) to highlight specific
dangers, such as where there is a high risk of animals on the road or where a road is not
suitable for certain vehicle types
 Information campaigns for those visiting our region, particularly where they are
driving left-hand drive vehicles
 An improved winter roads treatment programme, in particular ensuring that journeys
in the early morning and late evening are as safe as possible
 Level crossing closures / improved management of level crossings (which would
have the ancillary benefit of potentially being able to increase line speeds on the railway) 
28 Scottish Transport Statistics, includes figures for whole of Argyll and Bute
29 https://www.transport.gov.scot/news/scotland-s-road-safety-framework-to-2030/ 
Page 248

Page 249

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
104 
Policy 7j: Investment in our road network should continue to have an overarching
focus on safety with a view to reducing road traffic casualties in accordance with
Scotland’s Road Safety Framework to 2030.
Policy 7k: To address risks which are particular to roads in our region, the RTS supports:
enhanced advisory signage; ongoing public information campaigns around the use
of single-track roads; provision of additional safe motorist services and HGV rest areas;
and information campaigns for visitors driving left-hand drive vehicles.
Policy 7l: The RTS specifically supports the improvement or removal of priority junctions
on higher speed trunk roads, especially for right-turning traffic.
11.7 Rail service reliability
11.7.1 Whilst rail service reliability in our region overall was not identified as a major issue in the
‘Case for Change’, limited infrastructure, aging rolling stock and imported delay from
elsewhere in the country do cause some challenges in this respect. Our RTS therefore
supports measures that improve service reliability within and external to the region and reduce
station dwell times.
Policy ST7m: The RTS calls for increased provision of level boarding at stations across
the region, which will reduce station dwell times.
Policy ST7n: The RTS supports the provision of additional sections of double track (or
static or dynamic passing loops where double track does not represent value for
money) to improve punctuality.
Policy ST7o: The RTS supports infrastructure and timetable improvements external to
the region which will improve the reliability of services to / from Inverness, Fort William,
Oban and Mallaig.
11.8 How does this Strategy Theme contribute to our RTS Objectives?
11.8.1 The table below summarises how this Strategy Theme contributes to our RTS Objectives:
Table 11.1: Contribution of Strategy Theme 7 to our RTS Objectives
RTS Strategy Objectives 
SO1: To make a just transition to a post-carbon and more environmentally sustainable
transport network O
SO2: To transform and provide safe and accessible connections between and within our
city, towns and villages, to enable walking, wheeling and cycling for all O
SO3: To widen access to public and shared transport and improve connectivity within and
to / from the region O
SO4: To improve the quality and integration of public and shared transport within and from
/ to the region O
SO5: To ensure reliable, resilient, affordable and sustainable connectivity for all from / to
our island, peninsular and remote communities 
SO6: To improve the efficiency, safety and resilience of our transport networks for people
and freight and adapt to the impacts of climate change. 
11.8.2 This Strategy Theme is predominantly focused on SO6 in terms of improving the safety,
reliability and resilience of our road and rail networks. It therefore contributes highly positively
Page 249

Page 250

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
105 
to this RTS Strategy Objective. There would also be a minor positive impact for our island
communities (SO5), particularly for time sensitive freight. 
Page 250

Page 251

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
106 
12 Strategy Theme 8: Facilitating sustainable visitor
travel demand
12.1 Overview
12.1.1 Our region is characterised by extreme winter-summer differentials in travel associated with a
significant influx of domestic and international visitors. Retail and tourism are the second and
third biggest sectors by employment in our region, and the biggest employers outwith the
public sector. Indeed, compared to the rest of Scotland, the economy of our region has a
significantly higher proportion of jobs in tourism (10% versus 6.8% for the rest of the
country). The most recent (pre-COVID-19) data from VisitScotland suggests: 
 Argyll and the Isles30 (2017-19 average): a total of 6.5m visits, with 4.0m nights
stayed, with associated spending of £443m. Top attractions included Argyll Forest Park,
Inverary Castle and Staffa National Nature Reserve.
 Highlands31 (2019): a total of 12.5m visits, with 11.5m nights stayed and associated
spending of £1,533m. Top attractions included Urquhart Castle, Glenfinnan Viaduct,
Glencoe visitor centre and Glenmore Forest Park.
 Orkney32 (2019): a total of 192k visits, with associated spending of £67m
 Outer Hebrides33 (2017): a total of 218k visits, with associated spending of £65m. Top
attractions included Callanish Stones, Butt of Lewis and Harris Distillery
12.1.2 Taken together, these figures amounted to around £2bn of tourism spend annually in the
region pre-pandemic. 
12.1.3 Despite the clear benefits of tourism to our region, the volume, diversity and type of tourism in
our region has a significant impact on the transport network, some associated with ‘over-
tourism’. Some of the main impacts include:
 Higher traffic volumes and slower journeys during peak tourism season – this affects
both trunk and local roads. It also impacts on a range of different users, but particularly
on those for whom journey time reliability is essential, e.g., freight, residents travelling
for appointments etc. High volumes can also contribute to carriageway degradation
leading to frequent vehicle damage and punctures such as that seen in parts of Skye.
 Safety and driver frustration risks. This includes but is not limited to: the risks of driving
on the wrong side of the road; misunderstanding the frequent switches between dual and
single carriageway on the A9; safety and etiquette when driving on single track roads;
and the high risk of animals on the road.
 Indiscriminate, illegal, damaging and dangerous parking at ‘honeypots’ (e.g., the
Fairy Pools on Skye, Glenfinnan etc) and in passing places to take photographs or
admire views, of Luskentyre / Seilebost for example.
 Vehicle capacity constraints on many ferry routes (and passenger capacity
constraints on a handful of routes) – as visitors typically book further in advance, they will 
30 https://www.visitscotland.org/binaries/content/assets/dot-org/pdf/research-papers-2/regional-factsheets/argyll-
and-the-isles-factsheet-2019.pdf 
31 https://www.visitscotland.org/binaries/content/assets/dot-org/pdf/research-papers-2/regional-
factsheets/highland-factsheet-2019.pdf 
32 https://www.visitscotland.org/binaries/content/assets/dot-org/pdf/research-papers/orkney-visitor-survey-2019---
exec-summary.pdf 
33 https://www.visitscotland.org/binaries/content/assets/dot-org/pdf/research-papers/outer-hebrides-report---may-
18.pdf 
Page 251

Page 252

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
107 
often book a car deck space early, which can be to the disadvantage of residents who
tend to book at shorter notice (although urgent travel is almost always accommodated).
This can also impact on freight, although block booking of slots does provide a degree of
protection against this.
 There has also been a strong growth in ‘travel’ based tourism. The highest profile
example is the North Coast 500’s (NC500 initiative) success in attracting many more
visitors to the areas covered by the route. This actively encourages road-based travel
(car, motorbike, motorhome (where there has been rapid growth in rental provision)) in
some of the most remote areas of our region and indeed on some of the most unsuitable
roads. Whilst the NC500 was reported to have generated £22.9m in GVA for businesses
along the route in 201834, the increase in visitor numbers and the anti-social behaviour
exhibited by some visitors is not universally welcomed. Other examples include ‘trails’
such as the Malt Whisky Trail in Speyside and the Highland Tourist Route.
 Cruise tourism has also been a significant growth industry in the region, particularly in
Orkney (which is the UK’s most popular cruise ship destination, with over 170 calls per
annum) and Invergordon, but also in a selection of other ports such as Stornoway and
Portree. Cruise tourism can bring significant economic benefits and can also provide the
volumes required to maintain e.g., a large and modern bus fleet, but the sheer volume of
passengers can overwhelm the limited infrastructure and small communities. 
12.1.4 Overall, tourism is essential to our region, but sustainably managing its impact on the
transport network, local communities and the environment is a key consideration for our RTS. 
12.1.5 The figure below sets out the policy areas covered under this theme:   
Figure 12.1: Strategy Theme 8 – policy areas 
34 https://www.scottishfield.co.uk/travel/scotland-travel/north-coast-500-boosts-economy-by-22million/ 
Improving
active travel for
those visiting
our region
Improving public
transport
interchange for
those visitig our
region
Enhanced rail
services in peak
season
Parking provision,
management
and enforcement
at tourist
destinations
Targeted road
improvements
where there is
high seasonal
demand
Page 252

Page 253

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
108 
12.2 Improving active travel for those visiting our region
12.2.1 Whilst investing in and promoting active travel is a central theme of our RTS overall, it is
important to differentiate between leisure and 'travel for a purpose' journeys, such as travel-to-
work or education. Active travel planning and funding is conventionally targeted at the latter.
However, leisure-based active travel to and from tourist destinations as well as cycling and
walking holidays more generally is very prominent in our region. An important feature of many
of these trips is that they are linear (e.g., cycling the Hebridean Way) or concentrate high
volumes of cars at a specific nodal point (e.g., Glenfinnan) or mountain, forest, loch or river
access roadsides or car parks.
12.2.2 We recognise the importance of active holidays to our region and therefore support:
 The expansion of leisure-based walking, wheeling and cycling networks, building on
major success stories such as the Great Glen Way, Hebridean Way and West Highland
Way
 Improved active travel connections to and from major tourist attractions, both in
terms of infrastructure and visitor services such as bike buses
 Improved active travel connections to and from ports, airports and regionally
important railway stations to their surrounding hinterland
Policy ST8a: The RTS supports the further development of long-distance walking,
wheeling and cycling routes (including the National Cycle Network), recognising the
visitor, economic and local benefits offered.
Policy ST8b: The RTS supports the development of active travel connections to our
ports, airports and regionally important railway stations.
Policy ST8c: The RTS supports the development of active travel connections to our key
tourism destinations where this would be a realistic option for some visitors.
12.3 Improving public transport interchange for those visiting our region
12.3.1 A priority for visitors to our region is maximising their ‘holiday’ / leisure time, thus reducing
transport-related ‘dead time’. For public transport to be a viable and attractive option for
visitors, the public transport interchange experience must be of a high quality through a
combination of increased seasonal staffing, the provision of high-quality information and a
positive ‘welcome ashore’ experience for cruise passengers (an area in which Orkney has a
particularly strong reputation).
12.3.2 Partnership working is required to deliver a high-quality experience of this nature and thus it is
not an issue for the RTS alone. Multi-agency delivery from local authorities, port authorities,
Visit Scotland, HIE and other partners will be essential.
Policy ST8d: Where there are concentrations of international tourists, including cruise
passengers, the RTS supports the provision of enhanced local travel information and
coordination to improve visitor experience and reduce impacts on local networks.
12.4 Enhanced rail services in peak season
12.4.1 The railway network in our region, and in particular the scenic West Highland, Kyle and Far
North lines, experience a major uplift in passenger numbers in the summer. For many
passengers, the attraction is the journey itself, whilst for others the train is a means of
reaching their destination, either on a day-trip or where there is one or more overnight stays
Page 253

Page 254

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
109 
involved. This puts pressure on seat capacity, but also increases demand for the carriage of
bicycles, luggage, equipment etc on what are essentially urban diesel multiple units.
Whilst the infrastructure constraints on the region’s railway network limit the scope for a major
ramp-up in services, there are opportunities to operate some additional local services, such as
in the Fort William area. Similarly, there are options to strengthen peak services with
additional carriages (such as the Class 153 bicycle carriages introduced by ScotRail).
Policy ST8e: The RTS supports the operation and promotion of additional local rail
services to key tourism destinations.
Policy ST8f: The RTS supports the provision of additional rail carriages on existing
services in peak season, where feasible.
Policy ST8g: The RTS supports the principle of flexible timetabling where this can co-
exist with regular services for local residents.
Policy ST8h: The RTS supports the principle of expanded open access rail services
where these can be accommodated at no disadvantage to scheduled services.
12.5 Parking provision, management and enforcement at tourist destinations
12.5.1 The demand for parking and illegal / damaging / indiscriminate parking is one of the
more visible impacts of the seasonal influx of visitors to our region. Throughout Scotland,
parking management and enforcement resources tend to be focused on urban centres and
settlements and is concentrated on managing compliance and increasing turnover. It can be
difficult to flex this model to incorporate both specific tourist attractions (e.g., Luskentyre) and
large areas of high seasonal demand (e.g., the Cairngorms National Park). Added to
conventional parking problems is campervan and motorhome parking, coach parking at tourist
sites and other problematic practices such as parking in passing places. 
12.5.2 It is essential that the RTS adopts an even-handed approach to this problem – excess
demand and inappropriate parking behaviour imposes real costs on some of our communities
but, at the same time, these visitors are crucial to our local and regional economy. We
recognise that new / strengthened parking restrictions and enforcement are required in several
locations to manage demand and turnover and reduce inappropriate parking which restricts
access, jeopardises safety and impacts negatively on our communities. However, the parking
problem in many cases reflects a lack of parking supply or meaningful alternatives to
use of the car. We therefore support:
 Increased visitor parking provision where improved management and enforcement
would not make a material difference
 Specific parking for camper vans and motorhomes, including more European-style
‘aires’, and signed and dedicated spaces in town car parks such as those in Dornoch
 Management of overnight parking in laybys, including formalisation and clarification
for potential users around what is permitted or otherwise
Page 254

Page 255

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
110 
Case Study: Pen-y-Pass car park, Eryri National Park 
In Eryri National Park (Snowdonia), the
National Park Authority has introduced a
requirement to pre-book a parking space
at Pen-y-Pass car park between April and
October, a popular access point to Yr
Wyddfa (Mount Snowdon). The charge
for booking a parking space is not
insignificant but has been used to
subsidise the Sherpa’r Wyddfa bus
service, which provides high-quality
public transport access to the mountain
and around the National Park. This has
been supported by an app-based booking
system that provides real-time parking availability updates.
Policy ST8i: The RTS supports the principle of sustainably accommodating visitor
demand whilst maintaining or increasing visitor numbers.
Policy ST8j: The RTS supports the introduction of additional parking restrictions and
greater enforcement of existing traffic orders at tourist honeypots as a tool to
encourage improved access to these locations by public transport or active modes
and to address indiscriminate and dangerous parking.
Policy ST8k: Where new or increased parking charges are introduced, this should be
done in combination with improved visitor facilities, including e.g., parking provision,
public toilets etc.
Policy ST8l: Whilst recognising the benefits of motorhome and campervan-based
tourism in our region, the RTS acknowledges that it can impact negatively on our
communities at certain times of the year. The RTS therefore supports measures to
ensure that this demand is sustainably accommodated.
Policy ST8m: Whilst recognising the benefits of cruise tourism in our region, the RTS
recognises that catering for this demand can negatively impact on our communities.
The RTS therefore supports measures to ensure that this demand is more sustainably
accommodated.
Policy ST8n: The RTS supports measures which would allow the benefits of cruise
tourism to be more evenly distributed around the region.
Policy ST8o: The RTS supports the principle of bespoke bus services aimed at tourists to
address excessive car-based demand at honeypot locations.
12.6 Targeted road improvements where there is high seasonal demand
12.6.1 A growing challenge posed by tourism is the pressure that it puts on roads which are not
designed to accommodate it. The most obvious example of this is of course the North Coast
500, but other obvious examples include the Outer Hebrides Spinal Route in Uist, the roads
between Craignure and Tobermory / Fionnphort and the Bealach na Bà (Applecross, part of
the NC500) road. 
12.6.2 There are incremental improvements which could be made to these roads to improve their
standard and suitability including: improved maintenance where road conditions and verges
are severely damaged by high tourism volumes; improved and / or increased provision of
Page 255

Page 256

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
111 
passing places in areas of high demand; formalisation of informal passing places in areas of
high demand; and improved signing and lining.
12.6.3 Whilst the presumption of our RTS is against new road building, there will be occasions where
the case for more significant investments such as the long-proposed conversion of the Salen
to Tobermory route to single carriageway should not be ruled out, particularly when
considered from a safety, driver frustration and emissions perspective.
Policy ST8p: The RTS recognises that high volumes of tourist traffic are impacting the
condition of some roads in our region and that increased central government funding
is required that reflects this increased pressure on local transport infrastructure, to
support an enhanced repair and maintenance programme.
Policy ST8q: The RTS recognises that high volumes of tourist traffic can lead to slow and
inefficient journeys and therefore supports measures to address this.
12.7 How does this Strategy Theme contribute to our RTS Objectives?
12.7.1 The table below summarises how this Strategy Theme contributes to our RTS Objectives:
Table 12.1: Contribution of Strategy Theme 8 to our RTS Objectives
RTS Strategy Objectives 
SO1: To make a just transition to a post-carbon and more environmentally sustainable
transport network 
SO2: To transform and provide safe and accessible connections between and within our
city, towns and villages, to enable walking, wheeling and cycling for all 
SO3: To widen access to public and shared transport and improve connectivity within and
to / from the region 
SO4: To improve the quality and integration of public and shared transport within and from
/ to the region 
SO5: To ensure reliable, resilient, affordable and sustainable connectivity for all from / to
our island, peninsular and remote communities 
SO6: To improve the efficiency, safety and resilience of our transport networks for people
and freight and adapt to the impacts of climate change. 
12.7.2 We recognise the economic and societal importance of tourism to our region, but we also
understand the significant transport impacts that this demand can have on our communities.
Our RTS supports the continued development of tourism in our region but calls for both capital
investment and additional revenue funding to ensure that the demand generated by the sector
can be sustainably accommodated.
12.7.3 The policies promoted through this Strategy Theme will make a positive contribution to all six
of our RTS Strategy Objectives, complimenting resident-focused policies in other Strategy
Themes. Of particular focus is improving the provision, quality and integration of active travel
and public transport, thereby making notably positive contributions to SO2, SO3 and SO4.   
Page 256

Page 257

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
112 
13 Strategy Theme 9: Decarbonising our transport,
mitigating the effects of climate change
13.1 Overview
13.1.1 Decarbonisation and mitigating the effects of climate change is embedded through our RTS
through behavioural change and supply side changes. The small population of our region
means that it generates comparatively few emissions in absolute terms and is, at the same
time, one of the most vulnerable to the impacts of climate change. Increased severe weather
events will affect the reliability of our ferry and land-based transport networks and increase the
risks of geological instability, whilst rising sea levels pose a risk to our coastal roads and
railway lines. 
13.1.2 Whilst decarbonisation is a key objective at all levels of government in Scotland, there are
features of our region which make decarbonisation challenging, including the geography,
range of modes of transport and commercial provision of some transport services. Policies
and associated actions for achieving net zero in our region must reflect our local context and
circumstances and will in reality require an expansion of both capital and revenue funding.
13.1.3 The figure below sets out the policy areas covered under this theme:   
Figure 13.1: Strategy Theme 9 – policy areas
13.2 Decarbonising our public transport vehicle fleet
13.2.1 Outwith a few electric buses and hybrid-electric ferries, the public transport vehicle fleet in our
region is almost entirely hydrocarbon based. There are several reasons for this:
 The long-distance of many bus and coach routes means that they can be towards the
outer end of the range for electric buses. In addition, one end of almost every route is
likely to be relatively rural in nature and thus opportunities for recharging are limited.
Decarbonising our
public transport
vehicle fleet
Vehicle pooling and
vehicle sharing
Zero-emission vehicle
uptake and use
Page 257

Page 258

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
113 
 The same is also true of the railway network. At present, the strategy for rail
decarbonisation in Scotland, as defined in the Rail Services Decarbonisation Action
Plan35, is predominantly built around a rolling programme of electrification, but this will
be expensive to deliver in our region and will also assume a lower priority relative to
busier urban and suburban routes. To this end, alternative traction solutions are
proposed on the Aberdeen – Inverness, West Highlands, Far North and Kyle Lines –
however, the preferred option(s) have not yet been confirmed.
 For commercial bus, coach, ferry and aviation companies, hydrocarbon-based fuels are
generally cheaper than sustainable alternatives. Additionally for ferries, grid capacity
in island and rural communities may be short of what would be required to routinely
charge large seagoing vessels such as those in CFL’s ‘Major Vessel’ fleet.
13.2.2 However, our region is at the forefront of renewable energy production in the UK, and it
is important that our transport infrastructure capitalises on and reflects this.
Buses and coaches
13.2.3 Buses and coaches potentially present the quickest win in terms of decarbonising our
public transport vehicle fleet. Battery performance and range is rapidly improving and it is
likely that as older buses are phased out, they will gradually be replaced by electric buses.
This will likely be an organic process, starting in the Inner Moray Firth and larger settlements
such as Fort William and then gradually expanding over time. 
13.2.4 There is however a case for continued public sector support in incentivising the uptake of
more fuel efficient / alternative fuel vehicles and associated support services. This may require
the provision of financial or other incentives to commercial operators to modernise their fleet,
particularly for the very small operators found all across our region, but particularly in the most
rural areas. The Scottish Zero Emission Bus Challenge Fund is a good example of such a
scheme, where funding has been provided to upgrade refuelling infrastructure and convert
existing diesel buses to a zero-emission drive train or to fund new zero emissions buses.
Rail rolling stock
13.2.5 The rolling stock used in our region operates exclusively on diesel (although the LNER Azuma
units are bi-mode and are operated as electric services from Edinburgh Haymarket South
Junction). Moreover, the majority of the units used were built between the 1970s and 1990s,
with only the Class 170 stock built this century, and even that is now circa 20-years old. This
presents a challenge in terms of the scale of replacement required, but also an opportunity
to deliver a transformational change akin to that realised when the ‘Sprinter’ fleet was
introduced in the 1980s.
13.2.6 We recognise that the approach to traction decarbonisation will largely be driven from the top
down given that the units will operate to and within the Central Belt either routinely or
occasionally. It will however be important to communicate the specific needs and aspirations
of our region into the national process, particularly with regards to the prioritisation of
electrification schemes.
Aircraft
13.2.7 The market for aircraft is global and thus delivering a fully decarbonised fleet in our region will
to a large degree be driven by the economics of the industry. That said, there are exciting
developments in this field, and our region is in the vanguard of low carbon aviation in the form 
35 rail-services-decarbonisation-action-plan.pdf (transport.gov.scot) 
Page 258

Page 259

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
114 
of the Kirkwall-based Sustainable Aviation Test Environment, the UK’s first low carbon
test location at an operational airport (see case study below). 
13.2.8 Moreover, in most other transport sectors, change tends to happen at scale and trickle down –
for example, major rail investment tends to be concentrated on the busiest lines and electric
buses have been developed at scale in cities. In the aviation sector however, the early
decarbonisation opportunities relate to smaller aircraft – for example, Britten-Norman is
planning to introduce its first zero emission Islander aircraft in 2026. This presents an
important opportunity for our region where small aircraft such as the Islander, Twin Otter and
ATRs form the spine of our network.
13.2.9 Whilst we recognise that much of the aviation network in our region is commercial, there is a
clear opportunity for HITRANS and our constituent local authority members to facilitate
delivery of fleet decarbonisation through our PSO contracts.
13.2.10 PSOs are a unique opportunity to promote and incentivise early adoption of low or net-zero
emission technologies in aviation. Deployment of low emission aircrafts could start from
2026/27, and local authorities could be early adopters and help to establish the necessary
infrastructure for their operation, bridging the risk gap for operators. 
13.2.11 PSOs could be designed to promote innovation. For example, airlines can struggle to justify
investment in new aircrafts for fear of not being competitive at the next tender round if a
competitor offers an older, compliant aircraft. A new aircraft cannot be fully depreciated in the
c.4-year PSO cycle, therefore if the specification better promoted innovation and sustainable
technologies this could favour operators who prioritise low and zero-emission aircrafts in the
future.
Ferries
13.2.12 It should be noted that decarbonisation of the ferry fleets within our region is largely captured
in Strategy Theme 5 in relation to new vessels. Whilst it is possible to decarbonise existing
vessels (e.g., the proposed conversion of MV Shapinsay to hydrogen), the age of most
vessels in the Scottish networks means that this will be uneconomical relative to procuring
new tonnage.
Case Study: Sustainable Aviation Test Environment, Kirkwall 
As referenced above, the Kirkwall-based Sustainable Aviation Test Environment (SATE) is
the UK’s first low carbon test location at an operational airport. HITRANS and our constituent
member, Orkney Islands Council, are amongst several local partners involved in the SATE
consortium. Indeed, Kirkwall Airport has a dedicated hangar to house any aircraft during any
trial or demonstration flights. 
Led by HITRANS, SATE is at the forefront in progressing UK and Scottish Government’s
aviation aspirations, bringing together a consortium of 14 partners covering industry, public
sector, and academia. Partners work with a range of regional businesses and stakeholders
to showcase emerging technologies alongside real-world potential scenarios, highlighting the
environmental, social, and economic contribution sustainable aviation can make.
The project is part-funded by the UKRI Future Flight Challenge – a £300 million programme,
co-funded by government and industry, that is supporting the creation of the aviation
ecosystem needed to accelerate the introduction of advanced air mobility (AAM), drones,
and zero-emission sub-regional aircraft in the UK.
Page 259

Page 260

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
115 
While the SATE facilities are based at Kirkwall Airport, the project is evolving to focus on the
Highlands & Islands as a whole, matching new technologies with practical use cases to
benefit communities. 
The work for SATE covers: the development of new sustainable ecosystems; aircraft
development and demonstration; airspace change proposals; airport operations; ground
infrastructure; skills development; and energy and fuels.
SATE provides a blueprint for net zero regional aviation and has already delivered some
early successes, including trialling the first hybrid electric flights in Scotland and
collaborating with Windracers and Royal Mail on autonomous drone flights.
Policy ST9a: The RTS supports the implementation of measures which facilitate the
decarbonisation of the public transport vehicle fleet within the region, including
commercial vehicles, buses and community transport, rail rolling stock, aircraft and
ferries.
Policy ST9b: The RTS recognises the opportunities brought about by the availability of
renewable energy in our region, including locally produced green hydrogen. The
transport fleet mix and associated infrastructure should reflect this.
13.3 Vehicle pooling and vehicle sharing
13.3.1 Our RTS seeks to provide alternatives which make car ownership less necessary,
reducing the need to multi-car households in particular. The provision of vehicle pooling
and vehicle sharing opportunities are two means by which the ned to own a car, or an
additional car, can be reduced.
13.3.2 Vehicle-pooling is ride sharing where people with similar travel requirements share one
vehicle rather than making separate trips. Vehicle-pooling can be undertaken informally
between friends / colleagues (as is highly common in islands), coordinated by an employer, or
formally through an online platform or app that matches people who have no other connection
other than similar travel requirements. 
13.3.3 Vehicle sharing can remove the need for vehicle ownership. Instead, users access shared
vehicles through a vehicle sharing organisation that provides a fleet of vehicles in their local
area. Vehicles can then be booked online or via a smartphone app. The operator provides
Page 260

Page 261

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
116 
fuel, parking and maintenance with users paying a fee each time they use the vehicle. We
already support the concept of lift sharing through our www.hitravel.liftshare.com website,
which would provide a basis for further expansion.
Policy ST9c: The RTS supports the development of vehicle pooling and vehicle sharing
services across the region to reduce the need for personal car ownership.
13.4 Zero-emission vehicle uptake and use
13.4.1 The Scottish Government is aiming to phase out the need for new petrol and diesel cars by
2030, although the UK ban on the sale of such cars has been pushed back to 2035, in line
with the EU. It is therefore essential that, over the RTS lifespan, alternative fuels and
environmentally friendly technologies are critically assessed for both cars and good vehicles
(buses having been considered above). 
13.4.2 Battery Electric vehicles (BEVs) are seen as the long-term future of road transport (with Plug-
in Hybrid Vehicles (PHEV) and Hybrid Electric Vehicles (HEV) playing a role in the medium
term) – BEV registrations in the UK in 2022 were 40% higher than in 2021 and, with
267,203 new BEVs sold, accounted for 16.6% of all new car sales in that year.36 
13.4.3 BEVs offer zero tailpipe carbon emissions albeit they still have whole life carbon impacts, from
electricity generation, manufacturing to disposal. Whilst not a panacea for the issue of car-
based emissions, BEVs will deliver a major reduction in whole life carbon emissions. 
13.4.4 However, there are a number of factors hindering uptake:
 Despite lower running costs, BEVs remain significantly more expensive to purchase
than internal combustion engine (ICE) vehicles. This restricts market uptake and
introduces an inequality whereby those on lower incomes are either excluded from the
market or are disproportionally affected due to a higher proportion of their income being
spent on BEV acquisition. That said, improvements in battery technology and more
widespread adoption means that unit costs are declining, and it is anticipated that the
cost of an EV will come into line with an ICE vehicle in the years ahead.
 The running cost advantage of EVs was reduced by major increases in energy costs
over the period 2021-23 and the reduction in the number of free-to-use chargers. The
recent volatility of energy prices may act as a short-term barrier to BEV uptake, at least
until energy markets settle for a sustained period. 
 There are also relatively few BEV chargers in the region (626 in total as at 1st
October 202337), although provision varies by authority, with Orkney for example having
the highest number of chargers per capita in Scotland (231 chargers per 100,000
population38). This is a major challenge given the geographic expanse of our region
where journeys are often long. Moreover, steep and frequent gradients, shorter winter
days and inclement weather all give rise to range anxiety. This would be a particular
challenge for fully laden commercial vehicles travelling to and from e.g.,
geographically remote Scotch whisky distilleries.  
 The electrical grid in the region, and in particular in the most remote areas may not have
sufficient capacity to support the wholesale and uniform transition of the transport
network to EVs at present. A range of other low and zero emission fuels are also
emerging. 
36 https://heycar.com/uk/blog/electric-cars-statistics-and-projections 
37 https://maps.dft.gov.uk/ev-charging-map/index.html 
38 https://maps.dft.gov.uk/ev-charging-map/index.html 
Page 261

Page 262

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
117 
Case Study: FASTER
The FASTER Project is a joint initiative by partners in Scotland, Ireland and Northern Ireland
to support the overarching ambition to transition to low carbon transport systems. The
project partnership has completed the physical roll out and installation of 75 rapid (50KW
capacity) electric vehicle charging stations in the programme area. 
Within Scotland, 23 chargers have been installed at 12 sites across the Western Isles, Argyll
& Bute and the Highland regions. Three priorities were identified:
 To increase coverage across network gaps, aiding a just transition in more rural and
remote areas
 To improve accessibility for both small commercial vehicles and those with mobility
issues through the design
 To improve reliability through a more enforceable maintenance contract and co-
locating chargers on the Western Isles, so that there is a back-up if one is waiting to
be fixed. 
The multi-unit delivery programme afforded many learning opportunities, the most pertinent
being the complexity of scheduling four different suppliers for a five-stage installation
process at each site, after obtaining the necessary legal agreements and consents. Some
organisations built in significant timeframes for flexibility and were not accountable to
HITRANS or the project timeframes (e.g., 3rd party legal, wayleaves, EDF metering). This
resulted in some delays to the programme, causing frustration for members of the public. 
The project offered the opportunity to share challenges and learning with other members of
the partnership at a local, regional and national level and positive engagement with local
communities and private landowners helped achieve and overcome the necessary legal
issues.
HITRANS and partners hope to take forward the lessons learnt into future EV infrastructure
work including the EV Infrastructure Funding (EVIF) programme.
13.4.5 Whilst electric power is emerging as the dominant vehicle fuel technology, it will not
necessarily be appropriate in for all modes of transport, commercial vehicles for example.
Alternative fuels such as green hydrogen may therefore have a role of play in our region’s
future vehicle mix.
Policy ST9d: The RTS calls for the expansion of EV charging infrastructure to support the
decarbonisation of all vehicle based travel in our region.
Policy ST9e: The RTS recognises the challenges of distance, topography, climate and
short winter daylight hours to the rollout of battery electric powered commercial
vehicles and seeks low or zero emission solutions appropriate to our region that
capitalises on the surplus energy production within our region.
Policy ST9f: The RTS supports the roll-out of other alternative fuels to promote the
decarbonisation of our transport networks, ports, ferry terminals, airports and airfields.
13.5 How does this Strategy Theme contribute to our RTS Objectives?
13.5.1 The table below summarises how this Strategy Theme contributes to our RTS Objectives:
Table 13.1: Contribution of Strategy Theme 9 to our RTS Objectives
RTS Strategy Objectives 
SO1: To make a just transition to a post-carbon and more environmentally sustainable
transport network 
Page 262

Page 263

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
118 
RTS Strategy Objectives 
SO2: To transform and provide safe and accessible connections between and within our
city, towns and villages, to enable walking, wheeling and cycling for all O
SO3: To widen access to public and shared transport and improve connectivity within and
to / from the region 
SO4: To improve the quality and integration of public and shared transport within and from
/ to the region O
SO5: To ensure reliable, resilient, affordable and sustainable connectivity for all from / to
our island, peninsular and remote communities 
SO6: To improve the efficiency, safety and resilience of our transport networks for people
and freight and adapt to the impacts of climate change. 
13.5.2 The over-riding emphasis of this Strategy Theme is on transitioning to a post carbon and more
environmentally sustainable transport network, and it therefore makes a particularly strong
contribution to SO1. Mitigating the effects of climate change would have positive impacts for
our island communities (SO5) and in terms of the efficiency, safety and resilience of our
transport networks for people and freight (SO6).
13.5.3 Vehicle pooling and vehicle sharing schemes would expand shared transport provision within
our region and would thus support SO3.
Page 263

Page 264

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
119 
14 Strategy Theme 10: Embracing new
technologies
14.1 Overview
14.1.1 Travel in our region changed significantly in the 1960s and 1970s. The upgrading of major
roads such as the A9, the construction of river and estuarial crossings, the conversion of many
ferry routes to Ro-Ro and the growth in regional aviation provided new opportunities for travel
and improved journey quality. Since that period, the pace of change has been much slower,
with travel by 2010 not dissimilar to the end of the 1970s in terms of journey times, routes,
means of travel etc. However, over the last 10 years or so, the rapid growth in technology
combined with wider societal change (accelerated by COVID-19) has changed travel
behaviour across our region and beyond. 
14.1.2 Many of these emerging technologies, and their associated impacts on society, are at an early
stage of development and manifestation but offer new ways of providing and accessing
transport services. This Strategy Theme is therefore focused on options for embracing new
technologies over the lifespan of the next RTS.
Policy ST10a: The RTS embraces the opportunities provided by new technologies to
improve the provision of transport infrastructure and services across the region.
14.1.3 The figure below sets out the policy areas covered under this theme:   
Figure 14.1: Strategy Theme 10 – policy areas
14.2 Micromobility
14.2.1 Micromobility refers to the use of a range of small, lightweight vehicles, including bikes, e-
bikes, electric scooters etc. Micromobility devices can be human-powered or electric and can
be privately-owned or available through a shared fleet. 
Micromobility Mobility-as-a-Service
Connected and
Autonomous Vehicles
Page 264

Page 265

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
120 
14.2.2 Although not legal on the roads in the UK as of 2024, two wheeled electric scooters are
growing in popularity with sharing schemes available in several European cities and pilot
schemes running in the UK. These are usually dockless and typically, users can track,
reserve, and unlock scooters via their smartphone with payment on an annual, monthly, daily
or per-trip basis. The availability of shared schemes also removes the purchase cost for users
which can be a significant deterrent to use. 
14.2.3 Micromobility solutions can be delivered independently or as part of the overall concept of
mobility hubs, as introduced in relation Policy ST4d.
Policy ST10b: The RTS supports consideration of the provision of future innovative
personal transport within the design of our active travel network and mobility hubs.
14.3 Mobility-as-a-Service
14.3.1 Mobility as a Service (MaaS) allows users to plan, book and pay for multiple transport
services (including public transport, car clubs, access to active travel, taxi, demand responsive
transport, etc.) as packages based on their needs instead of buying these in a series of
individual purchases. The concept moves away from relying on personally owned models of
transport towards being able to access various modes of transport through a single platform.
The implementation of a MaaS system or systems within all of parts of our region would create
opportunities to develop a seamless, integrated and sustainable transport system that
effectively and efficiently meets the needs of residents and visitors. 
14.3.2 The fundamental components of MaaS are:
 Multi-modal: integration between multiple modes of transport including public transport,
active travel, and shared mobility solutions.
 Payment solutions: users are able to pay for their travel across a range of modes
directly through the MaaS platform with integrated multi-modal ticketing solutions in-built.
 One platform: for everything including travel information, booking, ticketing and
payments.
 Integration: bringing together customers, transport providers, public sector, payment
processors, telecommunication companies and the platform owners.
 Digital: an online platform supported by telecommunications technology.
 User-focused: centred around demand from customers and personalised to their needs.
14.3.3 MaaS is still an emerging concept and is yet to be widely implemented, although Apps which
are built on the principles of MaaS are beginning to emerge. For example, our Go-HI app
allows residents and visitors to plan, book and pay for end-to-end multi-modal journeys in a
single transaction using their smartphone or desktop devices. The platform offers instant
access to book buses, trains, taxis, demand responsive transport, car clubs, air travel and car
hire, with bicycle hire and ferries being added to the app as the project expands. The app
therefore provides a basis for the further development of this option into a fully functional
MaaS system.
Policy ST10c: The RTS supports the principle and further development of Mobility-as-a-
Service as the technology evolves, particularly through our Go-HI app.
14.4 Connected and Autonomous Vehicles
14.4.1 New vehicles are incorporating increasing levels of automation, where the driver is performing
increasingly fewer tasks. There are six tiers of automation, ranging from ‘no automation’
Page 265

Page 266

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
121 
through to Connected and Autonomous Vehicles (CAV), where the vehicle is able to
operate and perform functions without human intervention. 
14.4.2 Currently, only partially automated vehicles are available on the market. In partially automated
vehicles, the system takes control of most driving actions, but the driver is expected to remain
alert and intervene where necessary. Higher levels of automation are however being
developed and piloted with commercially driven advances in this sector being delivered by
organisations such as Tesla, Google and other major firms who are competing to develop fully
automated or ‘driverless’ vehicles. As such, it is plausible that higher standards of automated
vehicles will move from pilot projects to operational within the lifetime of our RTS. 
14.4.3 One of the immediate opportunities with respect to automation is autonomous buses. Indeed,
the UK’s first full autonomous bus service, CAVForth, launched in May 2023 running between
Ferrytoll Park and Ride in Fife and Edinburgh Park Transport Interchange (see the case study
below). Given that the driver accounts for the majority of bus operating costs, fully
autonomous (and unstaffed) buses would offer an important opportunity improve the viability
of ‘thin’ routes. Moreover, the demographic profile of bus drivers is ageing and there is an
emerging shortage of bus drivers across the country (particularly in rural areas), so this option
could also partially mitigate the risks posed by this.
14.4.4 Whilst there are clear benefits to CAVs, there remain many issues to overcome, for example
the allocation of liabilities in the event of a collision. In addition, it is important that automation
contributes to other goals, including the delivery of net zero. Moreover, given that automation
is market-led, it is essential that there is policy, regulatory and legal framework which governs
the introduction of such vehicles onto our roads.
Case Study: UKs First Autonomous Bus Service
Scotland’s first autonomous bus service was launched by HITRANS in October 2022, part-
funded by the Planning for Autonomous Vehicles (PAV) project, supported by the ERDF
Interreg North Sea Region Programme. The vehicle travelled a three-kilometre route linking
Inverness Campus with the Inverness Retail and Business Park. 
Page 266

Page 267

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
122 
Policy ST10d: The RTS supports opportunities for the more widespread adoption of
Connected and Autonomous Vehicles and autonomous buses, whilst recognising the
challenges posed in our region.
14.5 How does this Strategy Theme contribute to our RTS Objectives?
14.5.1 The table below summarises how this Strategy Theme contributes to our RTS Objectives:
Table 14.1: Contribution of Strategy Theme 10 to our RTS Objectives
RTS Strategy Objectives 
SO1: To make a just transition to a post-carbon and more environmentally sustainable
transport network 
SO2: To transform and provide safe and accessible connections between and within our
city, towns and villages, to enable walking, wheeling and cycling for all 
SO3: To widen access to public and shared transport and improve connectivity within and
to / from the region 
SO4: To improve the quality and integration of public and shared transport within and from
/ to the region 
SO5: To ensure reliable, resilient, affordable and sustainable connectivity for all from / to
our island, peninsular and remote communities 
SO6: To improve the efficiency, safety and resilience of our transport networks for people
and freight and adapt to the impacts of climate change. 
14.5.2 Emerging technologies offer a range of potential benefits for our region and thus could make a
positive contribution across our RTS Strategy Objectives in the future. 
14.5.3 New technologies in aviation are expected to provide new markets for passenger and freight
travel as well as improve efficiencies in current markets. Several examples are being explored
in SATE – including large UAVs with payload capacities of 100kg, and Airlander, the world’s
most efficient large aircraft, that could help to deliver cost-effective, low-emission passenger
transport and freight to the Highland and Island communities in the North of Scotland. 
14.5.4 Mircomobility and MaaS offer improved opportunities to make more environmentally
sustainable journeys (SO1), including by wheeling and cycling (SO2).
14.5.5 A combination of MaaS and CAVs, and in particular autonomous buses, offer the opportunity
to expand public transport connectivity (SO3) and improve quality (SO4) and efficiency, safety
and resilience (SO6). These benefits would accrue to our mainland and island (SO5)
communities.
Page 267

Page 268

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
123 
15 Strategy Theme 11: Reducing the cost of travel,
particularly for those most in need
15.1 Overview
15.1.1 A combination of distance, low volumes and, for passenger journeys, the frequent requirement
for more than one connection (and sometimes mode) when making a journey means that cost
of travel is major issue for some living in our region. Indeed, transport poverty is a major
issue, particularly in our island and rural communities. 
15.1.2 This Strategy Theme is therefore focused on policies that reduce the cost of travel, particularly
for those most in need. There are different ways in which the cost of travel can be reduced,
including universal reductions in fares, discounts targeted by either geography or person
group or measures to improve cross-operator ticket acceptance. Ahead of setting out our
policy position on these matters however, it is important to define what we mean by transport
poverty.
15.1.3 The figure below sets out the policy areas covered under this theme:   
Figure 15.1: Strategy Theme 11 – policy areas
15.2 Transport poverty
15.2.1 The European Parliament defines transport poverty as a:
 “…lack of adequate transport services necessary to access general services and work, or
the inability to pay for these services”.
15.2.2 Five distinct elements of transport poverty are identified:
 No transport availability (the lack of transport options or low frequency, also referred to
as mobility poverty)
Transport poverty Reduce public
transport fares
Expand Road
Equivalent Tariff
Cross-operator
ticket acceptance
Expanding the scope
and geographic
coverage of natioanl
fares policies
Expansion of the Air
Discount Scheme
Equitable road
pricing
Page 268

Page 269

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
124 
 No [physical] accessibility to transport
 Low transport affordability
 Too much time spent travelling
 Inadequate transport conditions (available transport options are dangerous or unsafe)39
15.2.3 As set out in the ‘Case for Change’ and alluded to throughout this Strategy, transport
availability, affordability and time spent travelling are pervasive issues across our region,
whilst accessibility and quality can be problems for some groups or in certain geographic
areas. Almost all of these issues are ultimately reflected in cost, either in terms of public
transport fares or through ‘forced car ownership’.
15.2.4 Recent research undertaken by the Scottish Government has found that 15% of people living
in rural Scotland (or 170,000 people) are in relative poverty. Fuel poverty is a particular issue,
with a third of houses in remote rural Scotland estimated to be in extreme fuel poverty,
compared to only 11% of households in the rest of Scotland (it should be noted that this
research was carried out prior to the steep increase in energy costs in 2022).40  Moreover,
island and peninsular communities in our region have additional costs associated with island-
mainland travel (and, in some instances, inter-island travel), particularly given the commuter
nature of some of our islands and peninsular communities (e.g., Rousay, Ardgour etc).
15.2.5 Transport cost, when considered in its broadest sense, and associated fuel poverty can
therefore be a ‘push’ factor in out-migration from communities which are already fragile. As
well as being damaging for the communities concerned, it makes service delivery much more
challenging, a point recently raised by The Highland Council in response to the 2022
Census.41
15.2.6 Whilst we know that transport poverty is a problem in our region, it is one that is ill-defined and
poorly evidenced. In making the case for investment to address this issue and determining
which actions would be most appropriate to address it, it is essential that work is done to
better define and evidence the problem. This will allow us through our RTS Action Plan to
develop and implement measures which will alleviate transport poverty in our region.
Policy ST11a: Transport poverty is a complex, dispersed and often hidden problem in
our region. The RTS commits to define and evidence this problem and identify
appropriate actions to be delivered by HITRANS and our partners. 
15.3 Reduce public transport fares
15.3.1 The absolute level of public transport fares across all modes can be a barrier to travel and a
contributory factor to transport poverty. This also acts as an incentive to visitors to travel by
car, rather than using public transport either to get to or travel around region.
Bus and coach
15.3.2 Any reduction in fares would likely lead to a reduction in revenue – that is, the additional
passengers generated would not cover the revenue lost from reducing the fare. Therefore, any
reduction in fares is likely to be dependent on the provision of additional public funding,
whether via subsidy or market intervention in accordance with the provisions of the Transport
(Scotland) Act 2019. 
39 Kiss, M., Understanding transport poverty (European Parliamentary Research Services, 2021), pp. 1-2. 
40 Poverty in Rural Scotland: A review of evidence (Scottish Government, 2021), pp. 4-5. 
41 Highland populations at risk of being 'drained' of people - report - BBC News 
Page 269

Page 270

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
125 
Case Study: Capped bus fares in England
To support post-pandemic patronage recovery, the UK Government provided funding to cap
single bus fares outside London at £2 until the end of 2024 (for participating operators), at
which point the government will review the effectiveness of the policy. Early indications are
that this initiative has been successful, with a Transport Focus survey finding that 11% of
respondents recorded increased bus use. This could be a potential model for our region but
would be dependent on the provision of additional external funding.
https://www.nationalworld.com/news/traffic-and-travel/when-does-ps2-bus-fare-cap-end-
new-finish-date-for-low-cost-fare-as-travel-discount-extended-4098311 
Rail
15.3.3 For communities living near the railway network in our region, the train service can be their
equivalent of a bus and may be their only meaningful public transport connection. Despite the
availability of the Highland Railcard, the cost of rail fares can still be more than the bus fare for
some. Moreover, many island and peninsular residents seek to connect with rail services at
Wemyss Bay, Gourock, Oban, Mallaig, Thurso and Aberdeen, with the cost of their rail ticket
often exceeding their ferry fare. 
15.3.4 Residents travelling outwith our region can also face significant fare costs as their journeys
are generally long distance. In some instances, variable demand-based fares designed to
maximise operator yield come into play, sometimes offering reduced costs for advanced
booking, but also increasing costs for essential short notice travel.
15.3.5 As with bus services, any reduction in fares would in all likelihood lead to an increase in the
overall operating deficit of the railway network, with the cost accruing to the Scottish
Government as the ultimate owner and funder of Scotland’s railway.
Publicly supported ferry services – passenger fares
15.3.6 With some limited exceptions (e.g., the Corran Ferry), all ferry foot passengers pay a fare for
travel. This is a supplementary cost paid by island residents which is additive to onward
transport costs when they arrive on the mainland. On several routes, such as those operated
by Orkney Ferries, passengers can buy heavily discounted books of tickets. However, being
able to do so is reliant on having the money up-front to buy these books, which discriminates
against those on lower incomes.
15.3.7 Reducing foot passenger fares, or removing them altogether, would be beneficial to those
living in island or peninsular communities, narrowing the cost differential which they face. It is
often suggested that providing reduced or free fares for foot passengers could be a potential
means of dissuading people from taking their car on the ferry. However, it is important to
recognise that there is no practical means of charging car-based passengers but providing
free fares for foot passengers. Whist the vehicle fare could still be applied (with a driver fare),
car passengers could walk on as a foot passenger for free. The Corran Ferry is an example of
where all passengers, whether on-foot or in a car, travel for free.
15.3.8 For those living in or travelling to the Orkney Islands, a reduction in the cost of onboard
accommodation (in addition to the ‘Islander’ fare) would be beneficial. However, the practical
limitations in terms of capacity are well understood and this may therefore only become a
consideration as part of the future replacement of the current NIFS fleet. 
Air services
15.3.9 For a small number of island communities, publicly supported air services provide the
lifeline mode of travel and / or fulfil a critical role in meeting specific needs, such as
Page 270

Page 271

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
126 
transporting children to and from school or allowing medical professionals to visit an island. Air
travel is however generally more expensive than making the journey by sea (or overland in the
context of Campbeltown and Caithness). Reducing fares to a level which is competitive with
sea or land-based travel would be advantageous for communities. 
15.3.10 The economics of the commercial aviation network in the region mean that fares can often
be prohibitively high. The Scottish Government's Air Discount Scheme (ADS) provides a 50%
reduction on core fares (i.e., pre-tax) for residents in certain parts of the region when travelling
for a purpose other than business. The fares themselves are set by the airline on the basis of
market conditions and vary by flight, time of booking etc. Fares could be reduced by
increasing the level of the ADS discount or widening its eligibility to e.g., businesses. 
Delivering public transport fares reductions
15.3.11 We support the principle of reducing public transport fares and recognise the benefits in
terms of reducing transport poverty and encouraging modal shift. However, we also recognise
several key challenges in providing lower fares:
 The majority of transport services in our region are either marginal or operate with a
subsidy. Given low population density, it is highly unlikely that the revenue foregone from
any reduction in fares would be offset by increased demand. There would therefore be an
additional cost to the public sector in either direct funding or subsidy to private
operators to account for this reduction in farebox revenue.
 Making changes to the means by which fares are set and their absolute level can also be
a complex undertaking and risks both unintended consequences and public
acceptability issues
 Any fares reduction would need to be delivered in a way that is compliant with
competition law and subsidy control, as well as within the regulatory framework
governing each mode of transport
15.3.12 The above is not to say that reductions in public transport fares cannot be delivered, rather it
is emphasising the importance of well-thought through analysis and appraisal to inform any
reduction in fares.
Policy ST11b: Recognising that, for many in our region (and especially those living in
our island communities), transport costs account for a high proportion of household
income, the RTS supports a reduction in public transport fares and the introduction of
payment plans for multi-journey tickets.
Policy ST11c: The comparative costs of public transport mean that residents and
visitors to the region often choose to travel by car. The RTS therefore supports a
reduction in the cost differential between travelling by public transport and car.
15.4 Expand Road Equivalent Tariff
15.4.1 Our RTS has a general presumption against increased car-based travel, recognising the
importance of decarbonisation and the policy commitment to reduce car kilometres by 20% by
2030. However, for most island residents, taking a car on the ferry for at least some
journeys is essential. It allows them to maximise time off-island and carry items such as
luggage, pets, goods purchased on the mainland or livestock in trailers. The absolute level of
car fares has long been recognised as a barrier to travel or an additional cost that island
residents must bear, despite below average incomes. Indeed, this formed the basis of the
Scottish Government's Road Equivalent Tariff policy, first introduced as a pilot in 2008.
15.4.2 There are numerous means by which car fares could be reduced, and this would merit a study
in its own right - indeed, the specific dynamics of each route would ideally need to be
Page 271

Page 272

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
127 
considered. It is though important to recognise: (i) the capacity challenges on many routes
that any fares reduction could exacerbate; and (ii) the risk of unintended consequences,
such as causing economic leakage from islands, with more money being spent elsewhere.
There is a significant body of evidence on the impact of RET and its variability by community
contained in the Evaluation of Road Equivalent Tariff on the Clyde and Hebridean Network,
published by Transport Scotland in March 2020.42  The principle of a general reduction in ferry
car fares would be addressed through Policy ST11c.
15.4.3 Beyond this however, we support the extension of the RET policy to services to the
Northern Isles and local authority operated services, again where this can be delivered within
the law. An inequality between our island communities has emerged, whereby some islands
have benefited from significant fares reductions associated with RET, whilst others have not.
Whilst the RET fares system may evolve over time, we support an equitable approach to the
setting of fares across all our island communities. We also support the principle that no
community should see an increase in their fares when RET is introduced, albeit we
acknowledge that there are again here significant complexities around which level of multi-
journey ticket book discount to peg the RET fare at.
Policy ST11d: The RTS supports in principle the roll-out of Road Equivalent Tariff to any
ferry routes on which it does not currently apply, including local authority services.
15.5 Cross-operator ticket acceptance
15.5.1 Many journeys to, from and within our region require one or more interchanges, often between
modes. For example, a resident of Stornoway travelling to Glasgow without a car could make
the journey using a combination of ferry, bus and rail. At present, almost all public transport
journeys in our region are payable separately, which is both expensive and inconvenient for
the passenger. It can also be complicated and confusing to find the cheapest fare.
15.5.2 This problem is of course common across most of the UK outwith London, where public
transport continues to operate within a regulated rather than a commercial environment.
However, the distances involved in many journeys and the frequent requirement for multiple
interchanges make the absence of cross-operator ticket acceptance particularly problematic
for our residents. To be clear, this is not simply a matter of convenience, which integrated /
smart ticketing solutions will address, rather it is about reducing the end-to-end cost of a
journey through, for example, through ticketing (e.g., ‘Rail and Sail’, expansion of PlusBus
etc) and fare capping.
Policy ST11e: The RTS calls for greater cross-industry partnership working and regulatory
reform to reduce the cost penalty for interchange within or between modes of
transport. 
15.6 Expanding the scope and geographic coverage of national fares
policies
15.6.1 A consequence of low population density and public transport frequency is that residents of
our region derive a proportionally lower benefit from national policies and funding
streams, e.g., the National Concessionary Travel Scheme – this is a clear inequality.
Indeed, we commissioned independent research on this topic in 2022, which confirmed that
residents of our region experience lower levels of public transport connectivity and have fewer
opportunities to use existing concessionary schemes. This is a location-based inequality and
can give rise to social exclusion and / or ‘forced’ car ownership. This inequality can be 
42 https://www.transport.gov.scot/media/49397/evaluation-of-road-equivalent-tariff-on-the-clyde-and-hebridean-
network.pdf 
Page 272

Page 273

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
128 
particularly stark for the most vulnerable groups such as the elderly, the young and people on
low incomes. 
15.6.2 There is therefore a case for extending:
 The scope of national fares policies – for example, where a train or ferry is the main
mode of travel in an area due to no / limited bus service provision, there is an argument
that the National Concessionary Travel Scheme card should be accepted on these
services
 The geographic coverage of national or regionally / locally targeted fares policies – for
example, expanding eligibility for the Highland Railcard
Policy ST11f: The RTS calls for the extension of the National Concessionary Travel
Scheme and Under-22s Concessionary Travel Scheme to rail, ferry and air services
where these are the main or only mode of public transport in an area.
15.7 Expansion of the Air Discount Scheme
15.7.1 The economics of the commercial aviation network in the region mean that fares can often be
prohibitively high. Retaining the ADS discount is essential for our region. Its expansion
would also be welcomed, particularly for those on the lowest incomes or for high
frequency users such as sports teams.
15.7.2 When originally introduced in May 2006, the ADS incorporated travel for private and public
sector business trips (including business travel for NHS staff), but this was discontinued from
April 2011 due to a combination of cost and compliance with European State Aid legislation.
However, work undertaken as part of the Our Islands, Our Future workstream in September
2016 indicated that ADS for business travel could be reintroduced in a legally compliant
manner and for circa £1.7m per annum (2016 prices).43
15.7.3 Regional air travel is essential to many businesses in our region, reducing the distance-based
cost disadvantage that they face. However, the high level of fares for those making (often
short-notice) business trips affects both the commercial performance of private firms and the
budgets of the public sector.
Policy ST11g: The RTS calls for the retention and expansion of the Air Discount Scheme,
including to businesses in the region.  
15.8 Equitable road pricing
15.8.1 We recognise that the vehicle fleet transformation from internal combustion engine vehicles to
BEVs will have significant implications for fuel duty and Value Added Tax (VAT) collected by
the UK Government through fuel sales. As EVs begin to account for an increasingly large
share of the overall vehicle fleet, it is inevitable that the government will need to identify a
replacement source of tax revenue. 
15.8.2 Whilst no firm decision has been made on this yet (nor has it even been the subject of a public
or Parliamentary debate), national road pricing has been mooted as a potential
successor to fuel duty / VAT. We recognise that this may provide benefits for some, but
there is also a risk that a national model applied in our region would not reflect its
unique characteristics, in particular the long travel distances and the comparative
importance of car travel. In a scenario where road pricing was introduced, it would be
essential to ensure that it was applied in a manner that did not exacerbate existing inequalities 
43 https://www.transport.gov.scot/media/4026/itf-29-sep-2016-ads-business-user-eligibility-paper.pdf 
Page 273

Page 274

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
129 
or create new inequalities for those living in our region. In this way any system should
recognise more and less ‘avoidable’ car use and charge accordingly.
Policy ST11h: National road pricing proposals may emerge in response to the
reduction in fuel duty and Value Added Tax as a result of the mass adoption of
electric vehicles. If this eventuality materialises, the RTS calls for a road pricing system
that recognises the unique characteristics of our region.
15.9 How does this Strategy Theme contribute to our RTS Objectives?
15.9.1 The table below summarises how this Strategy Theme contributes to our RTS Objectives:
Table 15.1: Contribution of Strategy Theme 11 to our RTS Objectives
RTS Strategy Objectives 
SO1: To make a just transition to a post-carbon and more environmentally sustainable
transport network 
SO2: To transform and provide safe and accessible connections between and within our
city, towns and villages, to enable walking, wheeling and cycling for all O
SO3: To widen access to public and shared transport and improve connectivity within and
to / from the region 
SO4: To improve the quality and integration of public and shared transport within and from
/ to the region 
SO5: To ensure reliable, resilient, affordable and sustainable connectivity for all from / to
our island, peninsular and remote communities 
SO6: To improve the efficiency, safety and resilience of our transport networks for people
and freight and adapt to the impacts of climate change. O
15.9.2 The high cost of travel for many journeys can either: (i) prevent a journey being made by
public transport, generating additional vehicle kilometres; or (ii) prevent a journey being made
altogether, which impacts on the life chances of our residents and the productivity of our
businesses. This Strategy Theme would therefore make a major contribution in widening
access to public and shared transport through reducing its cost, thus improving connectivity to,
from and within our region (SO3). By extension, achieving mode shift would support a just
transition to a post-carbon and more environmentally sustainable transport network (SO1).
15.9.3 Measures to reduce the cost of interchanging within and between modes of transport would
also support SO4.
15.9.4 The cost of transport is a particular issue for our island and communities. Island residents
often have to make long journeys on multiple modes or have to pay the cost of either taking a
car on the ferry or an expensive flight. Measures to reduce the cost of travel would therefore
strongly support SO5. 
Page 274

Page 275

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
130 
16 Delivering our Regional Transport Strategy
16.1 Overview
16.1.1 Our RTS is a long-term strategy intended to shape how transport infrastructure and services
are provided across our diverse region. Publishing a strategy is however only the first step in
delivering tangible outcomes for those who live and work in and visit our region. Its successful
implementation will require an ongoing programme of work (including appraisals, business
cases and design work), funding and political support. All of this will require close partnership
working between HITRANS and our constituent members, partner RTPs, the Scottish and UK
Governments, transport operators and other regional partners such as Highlands and Islands
Enterprise.
16.1.2 This chapter therefore sets out the steps which we will undertake to deliver our RTS.
16.2 Developing an Action Plan
16.2.1 Across the 11 Strategy Themes, we have developed over 100 policies, which state our
‘direction of travel’ across all components of the transport system in our region. However,
whilst our policies define the desired outcomes, they do not however state how these will be
delivered. This is entirely appropriate as selecting a preferred option is a matter for a business
case, which can reflect specific geographic considerations and available funding at a given
point in time.
16.2.2 Subsequent to the adoption of the RTS, an accompanying Action Plan will therefore be
developed. This will state the actions that we will take to progress the RTS and the timeframes
within which each action will be progressed. The Action Plan will contain a combination of
proposed appraisals / business cases, research studies, projects and programmes. It will
focus on actions that are regionally significant in nature - i.e., those which are large scale
or cross-boundary, either between authorities within our region or between our region and
other RTP areas. Local issues will be a matter for the Local Transport Strategies of our
constituent members. 
16.2.3 Unlike the RTS itself, which provides a circa 20-year strategic framework, the Action Plan will
be regularly reviewed and updated to reflect the changing status of projects, their differing
stages in the project lifecycle and the need for new or amended actions to support a policy
(e.g., in response to the emergence or development of new technology).
16.2.4 The first Action Plan will be published immediately after the adoption of the RTS and will
run to May 2027, which is the date of the next Scottish Local Government Elections, at which
point our Board will change. Thereafter, each subsequent Action Plan will cover the five-
year period between Scottish Local Government Elections. 
16.2.5 For each Action Plan period, we will set out our proposed programme of work by year and we
will revisit this annually as part of our budget setting process. 
16.3 Governance
16.3.1 Reflecting on our previous (2008) RTS, a major challenge in delivering our policy
commitments and the cross-boundary schemes and projects which emerged from them was
governance. Whilst we have a statutory role, our designation as a ‘Level 1’ RTP means that
we have very limited statutory powers and a lack of dedicated funding to support delivery of
our RTS. This has two consequences:
 Coordinating and delivering cross-boundary projects within our region is challenging as
we require the financial and political buy-in of affected member local authorities.
Page 275

Page 276

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
131 
Whilst a local authority may support in principle what we propose, each of our members
is subject to significant financial pressures and thus may be unable to fund regionally
beneficial investments without detracting from local projects for which they have
responsibility.
 We have emphasised throughout our RTS the unique characteristics of our region.
However, much of the funding allocated to our region is either disbursed directly by the
Scottish Government and its agencies (e.g., the funding of the Clyde and Hebrides
Ferry services) or provided to local authorities or third parties but within a strict set
of criteria (i.e., active travel funding provided via Sustrans).  
16.3.2 An immediate action upon adoption of our RTS will therefore be to undertake a regional
governance review, in partnership with our constituent local authorities. This will
consider both how we deliver the RTS and how funding is allocated to the region and
disbursed. Once complete, we will submit our analysis to Scottish Ministers for consideration
and, subject to approval, seek to implement the recommendations over the first RTS Action
Plan period.
Page 276

Page 277

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
132 
17 RTS Monitoring and Evaluation
17.1 Overview
17.1.1 It will be crucial to continually monitor and periodically evaluate the RTS to understand its
success in delivering the RTS Strategy Objectives. A set of KPIs linked to the Strategy
Objectives has therefore been defined and set out below. The KPIs closely reflect those
developed for the purposes of monitoring the National Transport Strategy 2, thus also allowing
us to understand how we are performing with respect to national level indicators. These
indicators will be used to measure the change in the performance of the transport system in
our region against the baseline initially established in the ‘Case for Change’ Report, which was
produced prior to the RTS being adopted. 
17.1.2 Monitoring reports will be produced on a two-yearly basis setting out the transport and
behavioural trends against the KPIs.
17.1.3 The Scottish Household Survey Travel Diary (SHSTD) publishes a range of local authority and
regional transport partnership statistics annually, usually two years in arrears, i.e., results from
2021 were published in 2023. This is one source of monitoring data, but sample sizes are
typically small, and some results are aggregated over a number of years reducing their
effectiveness. This will therefore be supplemented by a new HITRANS Travel and Transport
Survey (HTTS) which will be undertaken every two years and will monitor the main trends in
travel across the region, views on different transport modes and the causal mechanisms which
may drive changes in behaviour in line with the Strategy Objectives. There could be two
versions of this – reflecting mainland and island communities. 
17.2 Key Performance Indicators
17.2.1 The KPIs relative to each RTS Strategy Objective are set out below. For most KPIs, the data
will have to be built-up from the level of either individual local authorities or specific geographic
points (e.g., ferry routes and airports)
Strategy Objective 1: To make a just transition to a post-carbon and more
environmentally sustainable transport network.
 Transport emissions in the HITRANS region (Department for Business Energy and
Industrial Strategy
 Number of Air Quality Management Areas in the region (Scottish Transport Statistics)
 Proportion of road vehicle fleet which is ULEV (DfT Vehicle Licencing Statistics)
 Total public charging and rapid charging devices (DfT EV charging map)
 Number of kilometres of electrified rail track or number of battery-electric or alternatively
fuelled rail rolling stock units (Network Rail and ScotRail)
 Number of battery-electric or alternatively fuelled vessels (CMAL and local authorities)
 Number of battery-electric or alternatively fuelled aircraft used on PSO air services
(Transport Scotland and local authorities)
 Use of EVs by residents (HTTS)
Strategy Objective 2: To transform and provide safe and accessible connections
between and within our city, towns and villages, to enable walking, wheeling and
cycling for all.
 Number of bicycles available for private use by households (SHSTD)
Page 277

Page 278

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
133 
 Adults (16+) – frequency of walking in previous seven days (SHSTD)
 Main mode of travel – walking (SHSTD)
 Main mode of travel – bicycle (SHSTD)
 Cycling mode share (SHSTD)
 Percentage of pupils cycling to primary school (Sustrans Hands-Up survey)
 Percentage of pupils cycling to secondary school (Sustrans Hands-Up survey)
 The level of, barriers to, and attitude to walking, wheeling and cycling will be monitored in
the biennial (HTTS)
Strategy Objective 3: To widen access to public and shared transport and improve
connectivity within and from / to the region.
 Passenger journeys by region for local bus services (Scottish Transport Statistics,
although the figures for our region also include the Shetland Islands)
 Rail passengers by station (ORR estimates of station usage)
 Use of local bus services in previous month (SHSTD)
 Use of local train services in previous month (SHSTD)
 Main mode of travel – bus (SHSTD)
 Main mode of travel – rail (SHSTD)
 Number of taxi vehicles and private hire cars (Scottish Transport Statistics, local authority
level)
 Number of taxi driver licences (Scottish Transport Statistics, local authority level)
 Number of wheelchair accessible taxis and private hire cars (Scottish Transport Statistics,
local authority level)
 Terminal passengers by airport – Inverness, Passengers on selected domestic air routes
to and from Inverness, Terminal passenger traffic by origin / destination – Inverness,
Aircraft movements, by airport and type of movement – Inverness, and Air transport
movements by airport - Inverness (Civil Aviation Authority reported in Scottish Transport
Statistics)
 Residents’ use of public transport (including barriers to travel) (HTTS)
Strategy Objective 4: To improve the quality and integration of public and shared
transport within and from / to the region.
 Satisfaction with public transport (SHSTD or Transport Focus surveys, where the sample
size is large enough)
 Residents’ satisfaction with public transport, including integration (HTTS)
 Percentage of average weekly household expenditure on transport (SHSTD)
 Perceptions of safety and security on bus services (SHSTD)
 Perceptions of safety and security on train services (SHSTD)
Strategy Objective 5: To ensure reliable, resilient, affordable and sustainable
connectivity for all from / to our island, peninsular and remote communities.
 Annual ferry passenger carryings by route (Scottish Transport Statistics)
 Annual ferry car carryings by route (Scottish Transport Statistics)
Page 278

Page 279

Draft Regional Transport Strategy
HITRANS Regional Transport Strategy 
134 
 Annual ferry commercial vehicle and coach carryings by route (Scottish Transport
Statistics)
 Annual proportion of scheduled sailings cancelled, diverted or late by route (ferry operator
data)
 Terminal passengers by airport – island and other regional airports, Terminal passenger
traffic by origin / destination – island and other regional airports, Aircraft movements, by
airport and type of movement – island and other regional airports, and Air transport
movements by airport - island and other regional airports (Civil Aviation Authority reported
in Scottish Transport Statistics)
 Island residents’ use of and satisfaction with ferry and air services (HTTS)
Strategy Objective 6: To improve the efficiency, safety and resilience of our transport
networks for people and freight and adapt to the impacts of climate change.
 Reported road collisions (Scottish Transport Statistics)
 Personal injury accidents, overall and by route section as per the ‘Case for Change’
report (Scottish Transport Statistics)
 Fatal and serious personal injury accidents per million vehicle kilometres, by route section
as per the ‘Case for Change’ report (Scottish Transport Statistics)
 Residents’ perceptions of safety (HTTS)
 Road journey times by time period / time of year (INRIX, for the 17 route sections
identified in the ‘Case for Change’)
 Average freight lifted by UK HGVs in the HITRANS region (Scottish Transport Statistics)
 Foreign and domestic freight at ports in the HITRANS region (Scottish Transport
Statistics)
 Breakdown of freight commodity at ports in the HITRANS region (Scottish Transport
Statistics)
 Tonnage of freight carried, by airport (Civil Aviation Authority reported in Scottish
Transport Statistics) 
Page 279

Page 280

Page 280

Page 281

Appendix 2
Consultation Survey 
Below is the proposed response to the Hitrans Draft Regional Transport Strategy. 
1. Do you agree or disagree with the RTS Vision?
Agree 
2. Please provide any comments on the RTS Vision and / or explain your response
above should you wish.  
Moray Council agrees with the vision. In addition, access to health and
education as well as economic and socially valuable activities should be
stated. 
3. To what extent do you agree with RTS Strategy Objective 1: "To make a just
transition to a post-carbon and more environmentally sustainable transport network"?
Agree 
4. To what extent do you agree with RTS Strategy Objective 2: "To transform and
provide safe and accessible connections between and within our city, towns and
villages, to enable walking, wheeling and cycling for all"?
Agree 
5. To what extent do you agree with RTS Strategy Objective 3: "To widen access to
public and shared transport and improve connectivity within and from / to the
region"?
Agree 
6. To what extent do you agree with RTS Strategy Objective 4: "To improve the quality
and integration of public and shared transport within and from / to the region"?
Agree 
7. To what extent do you agree with RTS Strategy Objective 5: "To ensure reliable,
resilient, affordable and sustainable connectivity for all from / to our island, peninsular
and remote communities"?
Agree 
8. To what extent do you agree with RTS Strategy Objective 6: "To improve the
efficiency, safety and resilience of our transport networks for people and freight and
adapt to the impacts of climate change."?
Agree 
9. Please indicate how important you consider each RTS Strategy Theme to be.
Item 10
Page 281

Page 282

Strategy Theme 1: Transforming our communities and reducing the impact of
transport upon them
Quite Important      
Strategy Theme 2: Connecting our communities 
Very important      
Strategy Theme 3: Enhancing public transport connectivity to / from: (i)
Inverness; (ii) our sub-regional centres; and (iii) Scotland’s other cities and
beyond 
Very important      
Strategy Theme 4: Improving the integration, quality of and access to public and
shared transport
Quite important      
Strategy Theme 5: Providing connectivity that supports our island and
peninsular communities
Important      
Strategy Theme 6: Improving the efficiency of transport networks and supply-
chains and reducing their impact on our communities
Very important      
Strategy Theme 7: Improving the safety, reliability and resilience of our road and
rail networks
Very important      
Strategy Theme 8: Facilitating sustainable visitor travel demand
Quite important      
Strategy Theme 9: Decarbonising our transport, mitigating the effects of climate change
Important      
Strategy Theme 10: Embracing new technologies
Quite Important 
Strategy Theme 11: Reducing the cost of travel, particularly for those most in need 
Important 
Page 282

Page 283

Strategy Theme 1: Transforming our communities and reducing the impact of transport
upon them. Improving the public realm and mobility within settlements by reducing the
dominance of the private car and maximising opportunities for walking, wheeling and
cycling. 
Policy ST1a The RTS supports the principle of reallocating road space, including parking, from
general traffic. This should support placemaking to shape improved walking, wheeling and
cycling opportunities in our communities as a means to promote safe active travel and 
encourage use of active travel modes. Reallocation of road space should avoid any negative
impacts on bus services. Policy ST1b Where traffic in settlements is reduced by investment
in road infrastructure, road space reallocation should be undertaken as an integral component
of that investment. 
Agree, where appropriate 
Policy ST1c The RTS supports the principle of traffic calming and speed limit 
reductions and enforcement where this is the wish of our communities, including on the 
Trunk Road network. 
Agree, noting that this should be within the context of an evidence basis, national guidance and
best practice, including affordability. 
Policy ST1d The RTS supports measures to reduce road-based severance
in our communities. 
Agree 
Policy ST1e The RTS recognises the challenges presented by the impacts of increasing 
abnormal load movements across the region. It calls for a coordinated approach to be taken to
ensure that appropriate planning and mitigation is put in place as part of the planning process 
for new developments that will generate such movements. 
Agree 
Policy ST1f The RTS supports greater consistency (in ‘like-for-like’ locations) of parking 
management across our region, including payment mechanisms, parking information and 
enforcement. 
Partially disagree – a ‘one size fits all’ approach even in like-for-like locations does not recognise
the wider context of the different strategic approaches to parking management and enforcement
and the differing local contexts. Synergies can, and should, still be sought where possible.
Collaboration for consistency on information provision and (where there is an agreed fit) use of
technology is supported. 
Policy ST1g The RTS supports the principle of improving the management and enforcement 
of traffic and parking around schools, including School Streets (a road outside a school with 
temporary restriction on motorised traffic at school drop-off and pick-up times). 
Page 283

Page 284

Agree – Like many authorities, the management of traffic around schools is a matter that is
regularly raised by residents, and work has been ongoing for a number of years in Moray to
identify mitigations. Moray has trialled School Streets in two locations and has learning in this
area – collaboration across the region on this topic would be supported. 
Policy ST1h The RTS supports the prioritisation of new development in locations that are in 
proximity to key services and already well-served by active travel and public transport. 
Agree – and noting that where development is necessary in other areas, that transport needs
continue to be a high priority in terms of the necessary infrastructure to enable development. 
Policy ST1i The RTS supports the local delivery of public services, including health and 
education, and other day-to-day retail and personal services (e.g., banking) which minimise
the need to travel. 
Agree 
Policy ST1j The RTS supports the integration of active travel, public transport and shared 
mobility into the planning of all new developments. New development proposals should be 
required to outline how they will connect into the local active travel and public transport networks. 
Strongly Agree 
Policy ST1k The RTS supports the concept of ‘infrastructure first’ in relation to major 
developments across our region. 
Agree 
Policy ST1l The RTS recognises the centrality of environmental considerations, particularly
biodiversity enhancements and nature networks, within the planning and decision making
process. 
Agree 
Strategy Theme 2: Connecting our communities Facilitating walking, wheeling and
cycling within settlements and improving active travel connections between them. 
Policy ST2a The RTS supports transformational investment in the improvement of our existing 
active travel networks to make these accessible to all. 
Agree 
Policy ST2b The RTS supports the reinstatement and expansion of a network of strategic and 
local traffic free / quiet walking, wheeling and cycling routes to connect communities across and
beyond our region. 
Agree
Page 284

Page 285

Policy ST2c: The RTS supports the expansion of the National Cycle Network to all parts of the 
region. 
Agree 
Policy ST2d Our active travel infrastructure should be designed to a high standard in
accordance with the most up-to-date best practice and regionally appropriate design
standards (as this evolves) to meet the needs of all users. 
Agree – we would particularly highlight the need for regionally (and locally) appropriate
design standards that reflect both predicted usage of active travel infrastructure and
the rural environment in which it sits, rather than a standard nationwide approach
driven by city/urban needs.
Policy ST2e The RTS supports the integration of active travel and public transport
connections within our communities. 
Agree
Policy ST2f The RTS promotes the adoption of measures outlined in the Sustainable
Travel to Stations Strategy with respect to access to railway stations. 
Agree
Policy ST2g The RTS seeks the implementation of initiatives which widen access to
bicycles and e-bicycles, including e.g., promoting ownership, expansion of bicycle
share and hire and provision of new ‘first mile, last mile’ cycling opportunities. 
Agree
Policy ST2h The RTS supports the upgrade and new provision of bicycle parking
and facilities at all public buildings, transport interchanges and key on-street
locations within the region. 
Agree
Policy ST2i Our active travel network should be developed, presented and promoted
in a more coherent, recognisable and integrated way for regular, occasional and new
users of the network, including visitors. 
Agree 
Page 285

Page 286

Strategy Theme 3: Enhancing public transport connectivity to / from: (i)
Inverness; (ii) our subregional centres; and (iii) Scotland’s other cities and
beyond Distance, topography, geography and low population density currently
limit public transport connectivity within much of the region. This Strategy
Theme is focused on improving public transport connectivity for journeys
within, to and from the region through expanding the transport network,
providing additional connections and making journeys quicker. 
Policy ST3a The RTS supports measures to reduce social exclusion for those
without access to a car. 
Agree
Policy ST3b The RTS recognises that the decline in bus passenger numbers in the
region needs to be reversed and supports measures to extend service coverage,
improve frequencies, lengthen the operating day and make the network more
integrated. 
Agree – Moray’s work in this area in expanding the timetabled and demand responsive
m.connect bus network is focused on the need to provide appropriate public transport
links across our region, including the use of innovative approaches for service delivery.
Policy ST3c: The RTS supports measures to reduce bus journey times both between
and within settlements in the region, including through the provision of bus priority
measures. 
Agree
Policy ST3d The RTS supports innovative alternatives to fixed route bus services
where these can be affordably provided. 
Agree – as above, Moray Council’s m.connect service is delivering encouraging early
results in terms of demand responsive transport provision and the use of app-based
technology
Policy ST3e The RTS recognises the role which community transport and Demand
Responsive Transport (DRT) plays in our most rural communities and supports its
expansion and integration with timetabled services. 
Agree
Policy ST3f The RTS supports measures to widen the awareness and use of
community transport, DRT and EDRT amongst all members of society. 
Agree
Policy ST3g The RTS recognises the role of taxis as a key element of transport
provision in the region where community transport, DRT and EDRT services are not
provided. 
Agree
Page 286

Page 287

Policy ST3h The RTS recognises that rail journey times to, from and within the
region are typically longer than elsewhere in Scotland, and therefore supports
measures to reduce these journey times. 
Agree
Policy ST3i The RTS supports the commitment to electrify the Highland Mainline as
an opportunity to reduce rail journey times and improve reliability as part of the
overall decarbonisation of the network. 
Agree
Policy ST3j The RTS recognises that very low rail service frequency often makes rail
uncompetitive with the car and therefore supports measures which would facilitate
increased rail service frequency, particularly between Inverness and Aberdeen,
Edinburgh and Glasgow. 
Strongly Agree
Policy ST3k The RTS promotes and supports the development of additional local rail
services focused on our regional centres. 
Agree
Policy ST3l The RTS supports infrastructure measures which would enable
increased service frequency, such as the electrification of the Highland Mainline,
Aberdeen to Inverness and improvements to the signalling system. 
Agree
Policy ST3m The RTS supports the planning and delivery of new railway stations,
including innovative solutions proportionate to the location, subject to the
development of an appropriate business case. 
Agree – noting that this should be sought without detriment to the preceding policy
statements around journey time and frequency. 
Strategy Theme 4: Improving the integration, quality of and access to public
and shared transport Addressing the barriers to travel by public transport,
including interchange within and between modes, physical barriers for those
less able and poor-quality facilities and travel information. 
Policy ST4a The RTS supports measures that will improve integration within and
between modes of transport at key locations and transport interchanges in order to
provide new travel options and alternatives to the private car, recognising the
constraints within which this is possible (e.g., delivering school bus services). 
Agree – although note the tension between provision of school transport and general
public transport where pupils and general passengers are often wishing to travel at
Page 287

Page 288

the same time for both education and employment – measures to remove this
conflict to reduce barriers to the use of public transport for employment will be an
important factor to consider, so public transport becomes a meaningful option for all
journey types.
Policy ST4b The RTS supports integrated ticketing measures to simplify travel and
improve the passenger experience. 
Agree
Policy ST4c: The RTS supports the adoption of contract conditions for tendered and
supported services that encourage operators to work in partnership to improve
integration, timetable planning and coordination. 
Agree
Policy ST4d The RTS supports the provision and enhancement of mobility hubs
across the region, in line with a hierarchy reflecting local requirements. 
Agree
Policy ST4e The RTS supports measures which will enable people to leave their
bicycle in a secure environment at a bus stop / station, railway station, ferry terminal
or airfield. 
Agree
Policy ST4f The RTS supports, where practical, the provision of increased bicycle
capacity on public transport services within the region. 
Agree
Policy ST4g The RTS supports the simplification of the process of taking a bicycle
both to and onto a bus or train. 
Agree
Policy ST4h The RTS supports more widespread journeys which combine bicycle
and public transport. 
Agree
Policy ST4i The RTS supports the provision of consistent standards of facilities at
bus stations and bus stops reflecting location and usage. 
Agree
Policy ST4j Our bus network should be safe, secure and fully accessible to all. 
Agree
Page 288

Page 289

Policy ST4k Our bus network should provide a high-quality and consistent onboard
experience. 
Agree
Policy ST4l Travel on buses to, from and within the region should, where possible,
enable meaningful working time. 
Agree
Policy ST4m The RTS supports the provision of more consistent standards of
facilities at railway stations, reflecting station usage. 
Agree
Policy ST4n Our railway network should be safe, secure and fully accessible to all. 
Agree
Policy ST4o The RTS supports the continuation and expansion of the Scotland’s
Railway Adoption Programme and other measures to enhance the station
environment. 
Agree
Policy ST4p Our ferry network should be safe, secure and fully and easily accessible
to all. This includes both shore-to-vessel access and movement around the vessel
itself. 
Agree
Policy ST4q The RTS recognises that there is not a short-term solution to the
accessibility issues with the Argyll and Bute and Orkney inter-island air services. We
will keep abreast of developments in technology and new aircraft types and, in the
meantime, continue to work with partners to support alternative options such as the
Scottish Ambulance Service. 
Agree 
Strategy Theme 4: Improving the integration, quality of and access to public
and shared transport 
Policy ST4r The RTS supports sufficient provision and better enforcement of Blue
Badge parking across the region. 
Agree – within the context of individual approaches to enforcement across the region
still being supported.
Page 289

Page 290

Policy ST4s The RTS recognises the important role of taxis as part of the overall
transport mix in the region. It supports partnership working with licencing authorities
and taxi providers to raise standards of provision where required and to facilitate the
expansion of the network. 
Agree 
Policy ST4t The RTS supports the provision of taxi services which are fully accessible
in terms of booking and vehicle access. 
Agree 
Policy ST4u A key component of making travel accessible to all, the RTS supports
measures to remove barriers to travel, including increased staff training, passenger
chaperones and the provision of physical and online travel information in accessible
formats. 
Agree
Policy ST4v The RTS supports the maintenance and expansion of at-stop / at-station
multi-modal real-time information. 
Agree
Policy ST4w The RTS promotes the simplification and consolidation of travel
planning and in journey information to make travel easier for less frequent users. 
Agree
Policy ST4x The RTS supports the further development of the GO-HI travel app. 
Agree
Policy ST4y The RTS supports the provision of up-to-date physical travel information
at bus stops, and the removal of out-of-date information. 
Agree
Policy ST4z The RTS calls for improved cross-provider digital connectivity across the
region to facilitate access to travel information for all (including in-car information),
enable meaningful working time when travelling by public transport and to help
reduce the need to travel where possible. 
Agree 
Page 290

Page 291

Strategy Theme 5: Providing connectivity that supports our island and
peninsular communities Improving the connectivity and reducing the
peripherality of island and peninsular communities through improved ferry
and air services, and potentially fixed links. 
Policy ST5a The RTS supports the provision of longer daily time on-mainland and
on-island where this is required for the long-term sustainability of a community. 
Neutral – Moray Council does not have specific knowledge to comment.
Policy ST5b The RTS supports the provision of services which minimise the
requirement for one or more overnight stays. 
Neutral – Moray Council does not have specific knowledge to comment.
Policy ST5c: Where practicable, the RTS supports the operation of additional
sailings on the supported ferry networks within the region. 
Agree
Policy ST5d The RTS supports year-round seven-day connections for island and
peninsular communities where this is required for the long-term sustainability of a
community and enjoys public support. 
Agree
Policy ST5e The booking and ticketing arrangements for ferry services in the region
should support the convenience and efficiency of travel for all. 
Agree
Policy ST5f The RTS calls for the earlier opening of ferry booking systems and
increased transparency around the release and management of vehicle deck space. 
Neutral – Moray Council does not have specific knowledge to comment.
Policy ST5g The RTS supports the principle of Road Equivalent Tariff (RET).
However, where service frequency permits, controlled use of peak times / surge
pricing could be used to help manage demand, recognising that this would need to
be at no net detriment to the connectivity of island and peninsular communities. 
Neutral – Moray Council does not have specific knowledge to comment.
Policy ST5h The RTS supports operational measures which maximise the efficient
management of vehicle deck space on sailings. 
Neutral – Moray Council does not have specific knowledge to comment. 
Page 291

Page 292

Policy ST5i The RTS supports measures to improve door-to-door journeys through
enhancing active travel, public transport and shared mobility connections to and from
ferry terminals, combined with other measures to reduce the need to take a car
onboard. 
Agree
Policy ST5j The RTS recognises the long-term underfunding of vessels and
infrastructure in the region and strongly calls for fleet and infrastructure
modernisation to address issues of reliability and resilience. 
Agree – this has been a longstanding position for all HITRANS members
Policy ST5k The RTS calls for the development of a regularly maintained Vessels
and Infrastructure Planning Pipeline across all publicly supported ferry networks in
Scotland. 
Agree – a clear planning framework for vessel and infrastructure requirements would
add value.
Policy ST5l The RTS supports an increase in the overall fleet size and the inter-
operability of that fleet and supporting infrastructure to strengthen resilience. 
Neutral – Moray Council does not have specific knowledge to comment.
Policy ST5m The RTS supports the principle of increasing capacity through
frequency rather than larger vessels. 
Neutral – Moray Council does not have specific knowledge to comment.
Policy ST5n The RTS calls for an objective consideration of the design
characteristics of future vessels for all routes, including hull form and the provision of
crew accommodation. 
Neutral – Moray Council does not have specific knowledge to comment.
Policy ST5o The RTS supports the introduction of new low or zero emissions vessels
to replace life-expired tonnage. This should be done in line with the NTS2
Sustainable Investment Hierarchy. 
Neutral – Moray Council does not have specific knowledge to comment.
Policy ST5p with the vessel and infrastructure replacement cycle, the RTS supports
measures to reduce journey times for our island communities. This includes
providing direct sailings rather than via another island (where this is the preference
of the local community) and consideration of new ferry terminal locations that reduce
crossing distances. 
Neutral – Moray Council does not have specific knowledge to comment.
Page 292

Page 293

Policy ST5q The RTS supports harbour infrastructure improvements ahead of life
expiry where this could contribute to a material improvement in reliability. 
Neutral – Moray Council does not have specific knowledge to comment.
Policy ST5r The RTS supports the conversion of the remaining Lo-Lo routes in the
region to RoRo where there is community support. 
Neutral – Moray Council does not have specific knowledge to comment.
Policy ST5s The RTS supports the further development of the Highlands and
Islands’ air network.
Agree
Policy ST5t The RTS supports the further development of commercial external
routes, particularly to London Heathrow and other international hub airports, that
support the economic competitiveness of the region. 
Agree
Policy ST5u The RTS supports the retention of the PSO air network within the region
and, where alternative travel choices are inadequate, its further expansion.
‘Adequate’ in this context refers to the ability to achieve an affordable daily return to /
from a national centre. 
Agree
Policy ST5v The RTS supports the operation of additional connections and flights on
the PSO air networks within the region, whether delivered by existing, additional or
new low emission aircraft. 
Agree
Policy ST5w The RTS supports more direct flights rather than via another island. 
Neutral – Moray Council does not have specific knowledge to comment.
Policy ST5x The RTS supports the adoption of technological and infrastructure
solutions which would improve the reliability and frequency of inter-island air
services. 
Agree
Policy ST5y The RTS supports the principle of fixed links where they represent value
for money and are supported by the island or peninsular community. Any fixed link
should be implemented in conjunction with improved public transport connectivity
and incorporate provision for active travel. 
Neutral – Moray Council does not have specific knowledge to comment.
Page 293

Page 294

Policy ST5z The RTS supports the consideration of tolling where this would assist in
making the case for a fixed link. The use of vehicle number plate recognition
technology could allow local residents to travel for free. 
Neutral – Moray Council does not have specific knowledge to comment. 
Strategy Theme 6: Improving the efficiency of transport networks and supply-
chains and reducing their impact on our communities Many supply-chains in
the region are marginal and face challenges not found elsewhere in Scotland,
working around ferry connections for example. This Strategy Theme is
focused on enhancing the efficiency of supply-chains and identifying means
for improving their environmental sustainability. 
Policy ST6a The RTS supports the principle of new dedicated or high-capacity
freight vessels on freight intensive routes. 
Neutral – Moray Council does not have specific knowledge to comment.
Policy ST6b The RTS supports the formalisation and extension of the carriage of
unaccompanied trailers to a wider range of routes. 
Neutral – Moray Council does not have specific knowledge to comment.
Policy ST6c: The RTS supports the operation of dedicated freight sailings, either by
contracted or commercial operators where there is demand and it is operationally
deliverable. 
Agree, subject to business case
Policy ST6d The RTS supports moves towards greater simplification and
consistency in the setting of ferry freight fares across the region, recognising that this
would be achieved over the medium-term. 
Neutral – Moray Council does not have specific knowledge to comment.
Policy ST6e The RTS supports infrastructure measures which will enable the growth
of rail freight to and from the region. 
Agree
Policy ST6f The RTS supports infrastructure investment and funding initiatives which
will enable the growth of waterborne and air freight to, from and within the region. 
Agree 
Page 294

Page 295

Strategy Theme 7: Improving the safety, reliability and resilience of our road
and rail networks Weather, geological instability and very limited diversion
opportunities make resilience a key issue in the region, whilst safety is a
primary concern on many of the main road routes. This Strategy Theme is
therefore focused on improving the safety, reliability and resilience of
transport networks within the region. 
Policy ST7a The RTS restates our support for the full dualling of the A9 and A96,
with early prioritisation of the Elgin and Keith bypasses to dual carriageway
standards, following the already committed Inverness to Wester Hardmuir scheme.
Strongly Agree xxxxxxxxxxxxxxxx
Policy ST7b The RTS calls for incremental improvements to our road network where
there are safety, efficiency and environmental benefits, including in relation to single
track roads. 
Agree
Policy ST7c: The RTS supports the expansion of 50mph HGV speed limits across
the Trunk Road network in the region. 
Agree in principle – learning from the now well-established approach on the A9 as to
the risks and benefits of this would provide a potential mitigation in relation to journey
time and driver frustration, however, needs careful consideration to ensure there is no
detriment to road safety where trunk road alignments are different to the A9.
Policy ST7d The RTS supports the provision of improved overtaking opportunities on
our roads, especially where there are known problems with vehicle platooning which
can cause driver frustration. 
Agree – there have been long-standing concerns particularly in relation to the A95
between Aviemore and Keith in this matter.
Policy ST7e The RTS calls for investment in our regional road network where there
are regular and sustained periods of disruption due to weather and / or geological
instability. 
Agree
Policy ST7f The RTS recognises the increasing vulnerability of our region’s road
network to severe weather events linked to climate change and supports capital and
revenue measures to mitigate this. 
Agree
Policy ST7g The RTS recognises the increasing vulnerability of the railway network
to severe weather events linked to climate change and supports capital and revenue
measures to mitigate this. 
Agree
Page 295

Page 296

Policy ST7h The RTS supports the continued provision and expansion of real-time
travel information for motorists and public transport users through existing and
emerging platforms. 
Agree
Policy ST7i The RTS recognises that many parts of our region’s road network are in
poor condition. It calls for enhanced preventative and remedial road maintenance to
ensure the safe, reliable and efficient movement of people and goods and the
delivery of services across our region. 
Agree, although note that there is an underpinning fiscal issue in relation to the
challenges local authorities face in setting a balanced budget which delivers across
competing priority areas. 
Strategy Theme 7: Improving the safety, reliability and resilience of our road
and rail networks 
Policy ST7j Investment in our road network should continue to have an overarching
focus on safety with a view to reducing road traffic casualties in accordance with
Scotland’s Road Safety Framework to 2030. 
Agree
Policy ST7k To address risks which are particular to roads in our region, the RTS
supports: enhanced advisory signage; ongoing public information campaigns around
the use of single-track roads; provision of additional safe motorist services and HGV
rest areas; and information campaigns for visitors driving left-hand drive vehicles. 
Agree 
Policy ST7l The RTS specifically supports the improvement or removal of priority
junctions on higher speed trunk roads, especially for right-turning traffic. 
Agree
Policy ST7m The RTS calls for increased provision of level boarding at stations
across the region, which will reduce station dwell times. 
Agree
Policy ST7n The RTS supports the provision of additional sections of double track
(or static or dynamic passing loops where double track does not represent value for
money) to improve punctuality. 
Agree
Page 296

Page 297

Policy ST7o The RTS supports infrastructure and timetable improvements external
to the region which will improve the reliability of services to / from Inverness, Fort
William, Oban and Mallaig. 
Agree 
Strategy Theme 8: Facilitating sustainable visitor travel demand Responding
to the challenges arising from the significant seasonal influx of tourists to the
region, often in the areas least well-placed to accommodate it. 
Policy ST8a The RTS supports the further development of long-distance walking,
wheeling and cycling routes (including the National Cycle Network), recognising the
visitor, economic and local benefits offered. 
Agree
Policy ST8b The RTS supports the development of active travel connections to our
ports, airports and regionally important railway stations. 
Agree, and also note that public transport connections between transport modes eg
bus-rail, bus-air is also important – particularly in areas where active travel may not be
feasible (journey length or topography).
Policy ST8c: The RTS supports the development of active travel connections to our
key tourism destinations where this would be a realistic option for some visitors. 
Agree
Policy ST8d Where there are concentrations of international tourists, including cruise
passengers, the RTS supports the provision of enhanced local travel information and
coordination to improve visitor experience and reduce impacts on local networks. 
Agree
Policy ST8e The RTS supports the operation and promotion of additional local rail
services to key tourism destinations. 
Agree
Policy ST8f The RTS supports the provision of additional rail carriages on existing
services in peak season, where feasible. 
Agree
Policy ST8g The RTS supports the principle of flexible timetabling where this can co-
exist with regular services for local residents. 
Agree
Page 297

Page 298

Policy ST8h The RTS supports the principle of expanded open access rail services
where these can be accommodated at no disadvantage to scheduled services. 
Agree
Policy ST8i The RTS supports the principle of sustainably accommodating visitor
demand whilst maintaining or increasing visitor numbers. 
Agree
Policy ST8j The RTS supports the introduction of additional parking restrictions and
greater enforcement of existing traffic orders at tourist honeypots as a tool to
encourage improved access to these locations by public transport or active modes
and to address indiscriminate and dangerous parking. 
Partially Agree: considered use of powers to manage parking is welcomed, along with
collaboration and sharing of good practice. However, a one-size-fits-all approach to
decriminalised parking or other management tools does not recognise the different
positions of each authority on parking management. Some of the wider principles
expressed in the strategy around managing supply and demand, and considering
different approaches such as ‘aires’ for campervans are still supported. 
Policy ST8k Where new or increased parking charges are introduced, this should be
done in combination with improved visitor facilities, including e.g., parking provision,
public toilets etc.
Disagree – there are a wide range of factors that need to be considered in relation to
introducing new or altered parking charges, and an absolute restriction that links
changes solely to visitor facilities neither recognises those factors. Each local
authority should still have discretion to consider parking charges in relation to its own
strategic position. Collaboration on technology, information provision and sharing
best practice would still be welcome.
Policy ST8l Whilst recognising the benefits of motorhome and campervan-based
tourism in our region, the RTS acknowledges that it can impact negatively on our
communities at certain times of the year. The RTS therefore supports measures to
ensure that this demand is sustainably accommodated. 
Agree
Policy ST8m Whilst recognising the benefits of cruise tourism in our region, the RTS
recognises that catering for this demand can negatively impact on our communities.
The RTS therefore supports measures to ensure that this demand is more
sustainably accommodated. 
Agree
Policy ST8n The RTS supports measures which would allow the benefits of cruise
tourism to be more evenly distributed around the region. 
Agree
Page 298

Page 299

Policy ST8o The RTS supports the principle of bespoke bus services aimed at
tourists to address excessive car-based demand at honeypot locations. 
Agree
Policy ST8p The RTS recognises that high volumes of tourist traffic are impacting
the condition of some roads in our region and that increased central government
funding is required that reflects this increased pressure on local transport
infrastructure, to support an enhanced repair and maintenance programme. 
Agree
Policy ST8q The RTS recognises that high volumes of tourist traffic can lead to slow
and inefficient journeys and therefore supports measures to address this. 
Agree 
Strategy Theme 9: Decarbonising our transport, mitigating the effects of
climate change Supporting the decarbonisation of transport through the
adoption of zero emission vehicles, vessels, and aircraft. 
Policy ST9a The RTS supports the implementation of measures which facilitate the
decarbonisation of the public transport vehicle fleet within the region, including
commercial vehicles, buses and community transport, rail rolling stock, aircraft and
ferries. 
Agree
Policy ST9b The RTS recognises the opportunities brought about by the availability
of renewable energy in our region, including locally produced green hydrogen. The
transport fleet mix and associated infrastructure should reflect this. 
Agree
Policy ST9c: The RTS supports the development of vehicle pooling and vehicle
sharing services across the region to reduce the need for personal car ownership. 
Agree
Policy ST9d The RTS calls for the expansion of EV charging infrastructure to support
the decarbonisation of all vehicle based travel in our region. 
Agree – and note the work done to date on the Pathfinder project for the strategic
expansion of EV charging in partnership with public and private sector bodies.
Policy ST9e The RTS recognises the challenges of distance, topography, climate
and short winter daylight hours to the rollout of battery electric powered commercial
vehicles and seeks low or zero emission solutions appropriate to our region, and
which capitalise on the surplus energy production within our region. 
Page 299

Page 300

Agree
Policy ST9f The RTS supports the roll-out of other alternative fuels to promote the
decarbonisation of our transport networks, ports, ferry terminals, airports and
airfields. 
Agree 
Strategy Theme 10: Embracing new technologies. Capitalising on innovations
in new technology. 
Policy ST10a The RTS embraces the opportunities provided by new technologies to
improve the provision of transport infrastructure and services across the region. 
Agree
Policy ST10b The RTS supports consideration of the provision of future innovative
personal transport within the design of our active travel network and mobility hubs. 
Agree
Policy ST10c: The RTS supports the principle and further development of Mobility-
as-a-Service as the technology evolves, particularly through our Go-HI app. 
Agree
Policy ST10d The RTS supports opportunities for the more widespread adoption of
Connected and Autonomous Vehicles and autonomous buses, whilst recognising the
challenges posed in our region. 
Agree 
Strategy Theme 11: Reducing the cost of travel, particularly for those most in
need Improving the connectivity and reducing the peripherality of island and
peninsular communities through improved ferry and air services, and
potentially fixed links. 
Policy ST11a Transport poverty is a complex, dispersed and often hidden problem in
our region. The RTS commits to define and evidence this problem and identify
appropriate actions to be delivered by HITRANS and our partners. 
Agree
Policy ST11b Recognising that, for many in our region (and especially those living in
our island communities), transport costs account for a high proportion of household
income, the RTS supports a reduction in public transport fares and the introduction
of payment plans for multi-journey tickets. 
Page 300

Page 301

Agree
Policy ST11c: The comparative costs of public transport mean that residents and
visitors to the region often choose to travel by car. The RTS therefore supports a
reduction in the cost differential between travelling by public transport and car. 
Agree
Policy ST11d The RTS supports in principle the roll-out of Road Equivalent Tariff to
any ferry routes on which it does not currently apply, including local authority
services. 
Agree
Policy ST11e The RTS calls for greater cross-industry partnership working and
regulatory reform to reduce the cost penalty for interchange within or between
modes of transport. 
Agree
Policy ST11f The RTS calls for the extension of the National Concessionary Travel
Scheme and Under-22s Concessionary Travel Scheme to rail, ferry and air services
where these are the main or only mode of public transport in an area. 
Agree
Policy ST11g The RTS calls for the retention and expansion of the Air Discount
Scheme, including to businesses in the region. 
Agree
Policy ST11h National road pricing proposals may emerge in response to the
reduction in fuel duty and Value Added Tax as a result of the mass adoption of
electric vehicles. If this eventuality materialises, the RTS calls for a road pricing
system that recognises the unique characteristics of our region. 
Agree 
Page 301

Page 302

Page 302

Page 303

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 18 JUNE 2024 
SUBJECT: INFORMATION REPORT: ELGIN TOWN CENTRE PARKING
ENFORCEMENT 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of progress on Elgin Town Centre Parking
Enforcement. 
1.2 This report is submitted to Committee in terms of Section III (F) (17) of the
Council's Scheme of Administration relating to traffic and transport
management functions, including the preparation and implementation of traffic
management schemes. 
2. BACKGROUND 
2.1 There has been community concern about parking and lack of compliance of
parking in Elgin Town Centre. At the car parking stakeholder consultation held
in April 2023, it was clearly acknowledged by all parties that the
pedestrianised areas of the Plainstones and Batchen Street were being
misused for access and parking by drivers. 
2.2 At the meeting of this committee on 6 February a report was presented, and a
number of options were considered by Committee (paragraph 8 of the minute
refers). 
2.3 The option to fund additional Police Officer (overtime) hours as part of a
memorandum of understanding, was supported by this committee paragraph
8 of the minute refers, for up to six months, up to £10,000, from the Elgin
Common Good Fund, this was agreed by Elgin Members, to carry out
enforcement in Elgin Town Centre to help to address these concerns. 
2.4 The memorandum of understanding was prepared and agreed between
Moray Council and Police Scotland. 
2.5 The long-term solution for this area has been put forward as traffic control
(rise and fall bollards) as part of the wider Elgin Town Centre masterplan
project as part of the Levelling Up Fund.
Page 303

Page 304

2.6 A media release was sent out on 22 March 2024 advising that enforcement in
the town centre would begin and enforcement began on Monday 25 March
2024. 
2.7 Police Scotland have now been carrying out enforcement since week
commencing 25 March 2024 and this report highlights the work done until 22
May 2024. Based on the funding provided Police Scotland will continue with
enforcement work over the summer period. 
3. RESULTS OF ENFORCEMENT 
3.1  There have currently (as of 22 May 2024) been 533 tickets issued by Police 
Scotland. These include tickets for a number of different parking offenses 
including parking on double yellow lines, parking over 30 mins in a 30 min 
bay, driving through a no entry, parking in a loading bay, parking in a 
disabled bay without a blue badge and parking in a vehicle prohibition area. 
3.2 Over this period there have been 17 days of enforcement carried out. Police 
Scotland have reported that they are seeing a difference and change in 
behaviour of drivers in Elgin, with fewer cars being reported on the High 
Street in particular since the start of the campaign. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)
The report encompasses the main aims of the Economic Development
programme by maintaining suitable transport facilities and infrastructure
designed for their intended use and have vibrant town centres to support
local communities. 
(b) Policy and Legal
The relevant legislation is: -
Road (Scotland) Act 1984
The Transport (Scotland) Act 2019
The Functions of Traffic Wardens (Scotland) Order 1999 
(c) Financial implications
The cost of this is £10,000 over six months as discussed at this
Committee on 6 February 2024 with subsequent approval from Elgin
ward members that this was to come from Elgin Common Good Fund or
similar Trust. 
(d) Risk Implications
There were reputational risks to the Council by doing nothing and by
paying for enforcement.  Police Enforcement is enforcement of traffic
regulation orders and is enforcing compliance with the law and is
addresses community concern. These risks will be reduced once the
current street works are completed and when the traffic control
measures are implemented. The Levelling Up Fund project should be
completed by March 2026.
Page 304

Page 305

(e) Staffing Implications
There are no staffing implications arising from this report. 
(f) Property
There are no property implications arising from this report. 
(g) Equalities/Socio Economic Impact
There were some impacts on the grounds of disability. Enforcing the
restrictions which are already in place may affect people with a disability
as they may not be able to get directly to the location they wish, but this
is deemed justified as a proportionate way of ensuring safety and
accessibility for pedestrians. 
(h) Climate Change and Biodiversity Impacts
There are no climate change and biodiversity impacts arising from this
report. 
(i) Consultations
The Depute Chief Executive (Economy, Environment & Finance), Head
of Environmental and Commercial Services; Chief Financial Officer,
Legal Services Manager, Equal Opportunities Officer, Climate Change
Strategy Officer, Police Scotland and Committee Services Officer (L
Rowan) have been consulted and any comments taken into
consideration. 
5. CONCLUSION 
5.1 Parking Enforcement has been undertaken by Police Scotland over the
last couple of months and will continue for the next couple of months. 
5.2 Police Scotland have issued 533 tickets (as of 22 May 2024). 
5.3 Police Scotland are reporting a visible change in behaviour since the
enforcement began. 
Author of Report: Kelly Wiltshire, Strategic Transport Services Manager 
Background Papers:  Parking Enforcement – 6 February 2024 Economic
Development and Infrastructure Committee
https://newsroom.moray.gov.uk/news/additional-
measures-enforced-to-tackle-elgin-parking-issues 
Ref:  SPMAN-524642768-1107 
Page 305

Page 306

Page 306

Page 307

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 18 JUNE 2024 
SUBJECT: INFORMATION REPORT: SUSTAINABLE AVIATION TEST
ENVIRONMENT PROJECT 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform and update the Committee of a Hitrans (Highlands and Island
Regional Transport Partnership) Sustainable Aviation Test Environment
(SATE) project. 
1.2 This report is submitted to Committee in terms of Section III (F) (21) of the
Council’s Scheme of Administration in relation to local transport strategies. 
2. BACKGROUND 
2.1  SATE created the UK’s first low-carbon aviation test centre embedded at a 
commercial airport, in Kirkwall Orkney. The initial project saw the opening of 
dedicated hangar facilities and office space for technology developers as well 
as facilitating a number of demonstration flights of novel aviation technologies. 
SATE aims to expand on the success that has already been delivered and 
develop a UK centre of excellence for sustainable regional aviation. 
2.2 The project will match innovative aviation technologies with practical use 
cases in the Highlands and Islands, allowing technology partners to test in a 
real-world environment, taking them closer to offering sustainable innovation 
options for commercial use. Identified use cases include Scheduled airline 
routes; Offshore energy services; National Health Service activities; Island / 
remote region deliveries; Environmental survey and inspection. 
2.3 In addition, SATE aims to establish an unmanned aerial vehicle (UAV) hub-
and-spoke delivery network and will conduct demonstration flights of
technologies including a hydrogen-electric regional aircraft and a drone flight
from Scotland to Norway.
Page 307

Page 308

2.4 Over the past year or so, insights, reports and data have helped build a
picture of where technology from SATE could be best placed in the near
future to improve transportation and connectivity in the Highlands and Islands.
The main focus of the use cases has been on improving quality of life and
supporting economic activity. We are now looking for an opportunity to
present these findings to gather feedback and potentially explore further leads
to help refine and/or finalise the use cases for the project completion. 
2.5 This project has allowed to develop an understanding of the capabilities of the
technology. For example, this has included how fast it could travel, in what
conditions, load weights, required infrastructure; as well as fine-tuning the law
and regulations to allow safe operations. This has been explored in
conjunction with governmental and regional ambitions to ensure technology
can deliver an overall benefit and support the transition towards these goals.
Capturing an understanding of behaviours and choices has been essential to
identify the needs and wants transport could provide. This has involved
collecting data on car ownership, length of commutes, passenger numbers on
ferries, thriving business, demands for services etc. 
3. CASE DEVELOPMENT 
3.1 In SATE, for accurate use case development it’s important to understand
where the technology could help. 
3.2 One identified use, the case for the technology emerging from SATE is to
deliver tools, equipment and/or services in time-critical emergencies to
preserve life. (Across rescue, health, coastguard, fire, animal/veterinary, crime
etc). The identified issue is that time-critical emergencies in remote and rural
areas can be harder to reach. There’s often a reliance on other services to fill
gaps, sometimes at an extra expense, driving up the cost of living in remote
areas or resulting in a poorer quality of life. Efficiencies of operations can be
impacted.  
3.3 Benefits of the technology include: Potential speed of deployment; Reduced
risk due to remotely piloted systems and less complex technology; Cheaper;
Minimal infrastructure.  
3.4  There is evidence that the use of new and novel aircraft for emergencies 
would be the most accepted use. It was also observed emergencies rank top 
in a ‘transportation hierarchy’ for access, priority, speed, etc. Specific 
examples of operation within this use case have been identified and are 
mirroring real-world developments and demonstrations across the world. This 
includes using drones for non-confrontational monitoring and assessment of 
an active crime scene, delivery of life saving equipment such as 
defibrillator or tourniquet, and mapping of a fire. 
Page 308

Page 309

4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)
This links into our Corporate plan with; People lead healthy lives and
have access to quality care when they need it, our businesses and
communities prosper and our natural environment thrives for the
betterment of all. 
(b) Policy and Legal
There are no policy or legal implications from this report. 
(c) Financial implications
There are no financial implications from this report. 
(d) Risk Implications
There are no risks from this report it is for information purposes only. 
(e) Staffing Implications
There are no staffing implications from this report. 
(f) Property
There are no property implications on this report. 
(g) Equalities/Socio Economic Impact
This project may positively impact equalities in the future by creating
technology which may reduce response times to emergencies in rural
areas. 
(h) Climate Change and Biodiversity Impacts
This project may positively impact climate change and biodiversity in the
future by making aviation cleaner and less polluting to the environment. 
(i) Consultations
The Depute Chief Executive (Economy, Environment and Finance), head
of Environmental and Commercial Services; Chief Financial Officer,
Legal Services Manager, Climate Change Officer, Equal Opportunities
Officer and Committee Services Officer (L Rowan) have been consulted
and any comments taken into consideration. 
5. CONCLUSION 
5.1 This is an overview on the SATE project. Further reports will be brought
forward if and when there are potential projects in the Moray area. 
Author of Report: Kelly Wiltshire, Strategic Transport Services Manager 
Background Papers:  
Ref: SPMAN-524642768-1110 
Page 309

Page 310

Page 310

Page 311

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 18 JUNE 2024 
SUBJECT: INFORMATION REPORT: MORAY PATHWAYS LOCAL
EMPLOYABILITY PARTNERSHIP ANNUAL INVESTMENT PLAN
(2024-2025) 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To provide the Committee with the Moray Pathways Local Employability
Partnership Annual Investment Plan for 2024-2025.   
1.2 This report is submitted to Committee in terms of Section II (A) (2) of the
Council's Scheme of Administration relating to long-term financial plans. 
2. BACKGROUND 
2.1 Moray Pathways is the local employability partnership (LEP) that includes
over 50 support organisations and local employers from the public, private
and third sector.  It supports individuals who require additional help into fair
and sustainable jobs.  On behalf of the employability partnership, the Moray
Council are the anchor organisation / lead accountable body who co-ordinate
the administration of all resources made available for employability support
and provision in Moray.   
2.2 This diagram below shows the national delivery model and governance of the
partnership: 
Page 311

Page 312

2.3 The Moray Pathways Commissioning Sub Group (CSG) are responsible for
evaluating and scoring all financial procurement processes.  The
organisations within the sub group are; Moray Council, Department for Work
and Pensions, Developing Young Workforce (DYW) Moray, Skills
Development Scotland and TSI Moray. Employability plays an essential role in
delivering national and local aims of tackling poverty, promoting inclusion and
social justice and creating a fair and prosperous Scotland. The provision and
support we deliver aligns with broader Scottish Government cross cutting
policy drivers as shown below: 
2.4 Further to the Local Employability Partnership Delivery Plan 2022-2025
considered at the Community Planning Board on 22 September 2022 (para 4
of the minute refers), in 2023-2024 Moray Pathways commissioned 3 key
programmes, Sector Based Work Academy Programme (SWAP), Counselling
Support Network and a Creative Skills Network / Provision.  The number of
referrals received into Moray Council Employability Team for Keyworker
support has increased over the last year - with a notable increase of adults
aged 25 plus and parents living in poverty. The partnership also funded a total
of 21 local businesses via the Moray Employer Recruitment Incentive (MERI)
to provide a 6 month paid job placement ( Real Living Wage ) for a total of 27
individuals, 17 young people/adults and 10 parents.   The following tables
highlight the number of individuals who were supported across the Moray
Pathways partnership and outcomes achieved. The numbers carried forward
appear high but this is as a result of following up positive destinations for a
period of 12 months. 
Page 312

Page 313

Target Group New Start ( New Registrations)
23/24 
Carried Forward
22-23
Young People  185 206
Adults  141 155
Parents in poverty  60 ( mix of adults and young
parents) 
76 
TOTALS 326 437
Total number being supported
in 23-24
763 
Equalities Groups Number of New Starts
(23/24)
Economic Status  New
Starts 
(23/24) 
Disability / Mental Health  198 Unemployed  254
Care Experienced Young
People
45 Economically
Inactive
40
Refugees / Ethnic Minorities 52 Underemployed 31 
Criminal Convictions  21   
Participation Outcomes 
( New Starts 23/24)
Numbers 
Sector Based Work Academy Programme            (
SWAP Vocational training) 
90
Barrier Removal Activities 
Personal Development – 48%
Health and Wellbeing – 23%
Creative Skills – 19.2 %
Life Skills – 9.1 %
102
Employment  58
FE/HE  50
Engagement Phase  26
TOTALS:  326 
Page 313

Page 314

3. The Annual Investment Plan 
3.1 The Annual Investment Plan (Appendix 1) sets out proposals for the delivery
of employability provision and support.  The Annual Investment Plan takes
into account identification of local needs as evidenced by local statistical data
and input from stakeholders and service users.  The plan will address the
following priorities: 
3.2 The Annual Investment Plan (Appendix 1) is the annual plan linked to the
LEP 3 year Delivery Plan which was approved in 2022.  The Annual
Investment plan highlights the range of provision and employability support
that the LEP plan to deliver and implement to meet the needs of target groups
and at the same time deliver a place based approach with partnership
outreach support.  In particular, the LEP are keen to adopt a specialist
supported employment model which will provide intensive support for
individuals who are faced with inequalities and at risk of being left behind. 
The partnership will continue to monitor the range of commissioned provision
on offer with a mix of public and third sector providers.  There will be quarterly
monitoring reports to the LEP and MEP. The commissioning sub group will
provide forecast updates to the wider partnership and update any changes to
the plan.   The Annual Investment plan also shows the utilisation of a range of
funding streams including UK Shared Prosperity Funds, Scottish Government
Grant Funds and Moray Council Core Funding. 
4. SUMMARY OF IMPLICATIONS 
a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The Moray Pathways Local Employability Partnership Annual
Investment Plan will contribute to achieve the Corporate Plan priorities
to take poverty and inequalities and build a stronger, vibrant and
greener economy.  The plan also aligns with the LOIP priority of a
growing and sustainable economy and in particular the focus on
targeted approaches to those furthest from the job market.
Page 314

Page 315

b) Policy and Legal
The Council considers support for economic development issues on
their merits, against the objective to facilitate sustainable economic
growth and the desired outcomes of the Ten Year Plan and Corporate
Plan. 
c) Financial implications
The only budget provided by Moray Council is in relation to core
staffing needed to manage and support temporary grant funded
staffing.   
d) Risk Implications
None. 
e) Staffing Implications
Temporary staffing varies from year to year depending on updated focus
and exactly what is commissioned. 
f) Property
No property implications arising from this report. 
g) Equalities/Socio Economic Impact
The actions and outcomes within the annual investment plan contribute
to tackling inequalities in our communities and an equality impact
assessment has been sent to Scottish Government.   
h) Climate Change and Biodiversity Impacts
None. 
i) Consultations
Consultation has taken place with members of the Local Employability
Partnership, Depute Chief Executive (Economy, Environment and
Finance), the Head of Economic Growth and Development, Economic
Growth and Regenerations Manager, the Legal Services Manager, the
Property Assets Manager, the Equal Opportunities Officer, and Lissa
Rowan, Committee Services Officer have been consulted and comments
received have been incorporated into the report. 
5. CONCLUSION 
5.1 The report provides information on the Moray Pathways Local
Employability Partnership (LEP) Annual Investment Plan for 2024-2025. 
Author of Report: Amy Cruickshank, Employability Team Manager 
Background Papers:
Ref: 
Page 315

Page 316

Page 316

Page 317

Local Authority - Moray Council
To provide flexible, person-centred support
under the No One Left Behind All-Age
Employability Service – broken down into
specific groups identified as a local priority.
How do you intend to monitor this?
Young People  ( Mentoring Young Talent Project ) - focus on equalities groups, CEYP, Justice, Mental Health, Disability , Young Carers.  1: 1 Keyworker
Support ( Young People and adults ) - focus on equalities groups, economically inactive, LTU, over 50s.  MERI paid job placements for LEP priority
groups.
To support tackling Child Poverty using No One
Left Behind funding - broken down into specific
groups identified as a local priority.
How do you intend to monitor this?
We gained data from a survey of parents with regard to the barriers facing parents with the lack of school aged childcare (SAC)  in Moray.  We have
only 3 after school providers in moray and this is not adequate.  We have employed a project officer to deliver on an action plan developed with a
working group including elected members, MOD, SGov, SAC providers and other key stakeholders.  We are collaborating with education to develop a
plan for each locality and follow a place based approach, we are also providing set up business grants for people keen to start a new SAC provision . 
To support disabled people Our new specialist keyworkers and additional placement support will provide the gap in support we currently have, working with an OT will also help
this and working closer with NHS in general.  We will also refine our support to students with disabilities who we support from their work skills
course at UHI Moray,
To support minority ethnic people and others
with protected characteristics.
We have a Keyworker who is funded by the local resettlement team within Moray Council which has improved relationships across the services who
support refugees / resettlement.  We work closely with our CLD colleagues and we have funded an adult learning co-ordinator to support this work.
To address specific local priorities such as
reducing inactivity.
We have a priortiy to reduce economic inactivity with increasing numbers.  We are implementing a specialist service to support this and using our
digital inclusion officer to use digital support as a hook to engagement with DWP customers.  Our outreach hubs will also extend our reach to people
not looking for work due to mental health and not engaging with any services.
ANNEX A - Annual Investment Plan - 2024/25
Service Delivery
What activity do you intend to deliver within this financial year via the Local Authority, Other Public Sector Bodies, Third Sector and Private Sector…
Page 317

Page 318

Please describe what external provision you
intend to commission in this financial year.
Is this planned new commissioning or are
existing providers commissioned over multiple
years?
We are extending 2 existing contracts, only in place for 3 months, due to funding delays 23/24.  Counselling and Creative skills network.  We also
have a 2 year contract using UKSPF for our Moray Pathways SWAP programme.  We may tender for personal development provision / contract or we
may use CLD / youth work to co-ordinate this work.
What work will be undertaken to design,
improve, or support referral pathways in your
area?
Refine referrals and feedback to DWP colleagues , implement post school pathway planning meetings to focus on key groups ( eg CEYP leavers ) , this
will increase referrals for specific groups and a targeted approach across the partnership - lead jointly with SDS
Please describe planned engagement with local
businesses and any work towards supporting the
Green Economy.
Business Engagement Project Officer to focus on employer engagement with new supported employment offer and support the SWAP contract
holder ( Enable works ) with making sure green skils are development within the SWAP contract / voluntary work placements / vocational training. 
Engaged with a local businesses via MERI development work, job-carving for people who require specialist supported employment.  Moray has a
large number of Smes/ micro businesses and MERI supports these businesses to grow and provide training to the individuals we support.
Please describe the plans for the provision of ERI
placements or other paid work placements.
We have allocated an estimate of £322K of MERI funding for paid job placements this year.  £200K for parents and £122K for young people and
adults
Please describe plans for the provision of
Training Allowances.
Included in the commissioned contract for our Sector Based Work Academy Programme ( Moray Pathways SWAP ) , additonal funds provided to fund
training allowance payments for those who are eligible.
Please describe any challenges, issues or
concerns that may affect delivery this financial
year. What steps are you taking to address
these?
Annual funding is a challenge to commission sustainable contracts and providing continuity for clients we support.  Scottish Government are
considering bi- annual funding grants in the future.  We also don’t know the future of the UK Shared Prosperity Funds beyond March 2025.
Page 318

Page 319

APPENDIX 1 - Service Delivery Requirements and Approach Template
Local Authority Moray Council
Plans for Delivery with NOLB Funding
Target Group Rationale for Intervention Delivery Method/Description Delivery Partners
Delivery
Partner Sector
Anticipated
Start Date
Actual Start
Date
Forecast
Spend Other Sources of Investment Outcomes Expected
All age and groups Priority 1 - Reach Project Management of outreach hub
delivery ( New Elgin )
All Local Employability
Partners (LEP)( Public,
Private an Third )
Public Jul-24 £50K Funding bid into Elgin Town Centre
Fund
Numbers participating and sustaining 
learning, training and work opportunities
All age and groups Priority 1 - Reach PR/Marketing of Moray Pathways To be procured Private Aug-24 £10K Numbers participating and sustaining
learning, training and work opportunities
Parents in Poverty Priority 3 and Priority 5 - Tackling Child
Poverty and Skills
Barrier Removal - Counselling Network
Contract
Elgin Counselling Centre Private Jun-24 £18K - Child
Poverty,
£18K No-one
Left Behind
(NOLB)
No participating and sustaining learning,
training and work opportunities
Parents in Poverty Priority 3 & 5 - Tackling Child Poverty and
Skills
Barrier Removal Creative Skills Network
Contract
M.A.D.E ( Moray Arts
Development Engagement 
Network Tailored Provision,
Public/ Private and Third
Third Jun-24 £25K - Child
Poverty,
£25K No-one
Left Behind
Fund (NOLB)
No participating and sustaining learning,
training and work opportunities
No participating and sustaining learning,
training and work opportunities
Parents in Poverty
Priority 3 and Priority 5- Tackling Child
Poverty
Barrier Removal - (Personal
Development/Group work /other )
Local Employability
Partnership partners across
the network , internal and
external provision
Public May-24 £75 K CP,
£75,000
NOLB
No participating and sustaining learning,
training and work opportunities
Parents in Poverty Priority 3 - Tackling Child Poverty School Aged Childcare Business Grants Business Gateway, local
employers / providers
Third May-24 £70,000 - CP No participating and sustaining learning,
training and work opportunities
Economically Inactive , Disability ,
Mental Health,. Ethnic Minorities,
Care Experienced, Long-term
Unemployed, Justice
Priority 3 & 4 - Child Poverty and Health
and Work
Supported Employment Specialist Support Moray Council Employability
Team, NHS and Moray
Chamber of Commerce
Public Jun-24 £100K - CP,
£100k NOLB
No participating and sustaining learning,
training and work opportunities
All age groups and priority /
equalities groups
Priority 5 Project Officer -Business Engagement Developing Young Workforce
Moray, Moray Chamber of
Commerce, Federation of
Small Busineses
Public Jul-24 £25K CP,
£25K NOLB
No participating and sustaining learning,
training and work opportunities
All age groups and priority /
equalities groups
Priority 3, 4 and 5 , Child Poverty, Health
and Work and Skills /Business
Engagement
Moray Employer Recruitment Incentive Moray Council Employability
Team, Moray Chamber of
Commerce, Local Employers
across public, private and
third sector
Public Jun-24 CP - £200K,
NOLB - £122K
No participating and sustaining learning,
training and work opportunities
When completing the tables above and below, please include the following information:
Target Group - describe the priority groups being provided with support. Please include the groups identified in cells B8-B12 in the Description tab.
Rational for Intervention - describe why this group has been identified, e.g. what statistical evidence has been utilised
Delivery Partners - record whether this is expected to be in-house delivery or input which external partners have been/may be commissioned.
Budget - record the anticipated full year spend on this particular provision.
Anticipated Start Date - when do you expect to start this particular provision.
Forecast New Starts - how many new participants will access/be supported by this provision this financial year?
Forecast Spend - how much do you expect to spend on this particular provision in this financial year?
Other Sources of Investment - give detail if NOLB funding for this provision will be supplemented by any other investment, e.g. LA Core Employability funding, Shared Prosperity Fund, other sources. If known, please provide the expected breakdown from each source of funding in monetary values.
Outcomes Expected - describe the types of outcomes expected and the % of new starts expected to achieve this.
In Year Amendments/Additions to Plans for Delivery With NOLB Funding
Page 319

Page 320

Delivery UKSPF or Other Funding
Target Group Rationale for Intervention
What Funding Source/Delivery
Method/Description Delivery Partners
Delivery
Partner Sector
Anticipated
Start Date
Actual Start
Date
Forecast
Spend Other Sources of Investment Outcomes Expected
Parents in Poverty
Priority 3 and Priority 5 - Tackling Child
Poverty and Skills
Sector Based Work Academy Programme Enable Works an UHI Moray (
Third and public sector )
Third Apr-24 01/04/2024 £477K No gaining vocational qualifications , No job
starts , no sustaining employment
Priority 4 & 5 Mentoring Young Talent Moray Council Employablity Team,
Education, Childrens Services, Promise
Team, Justice, Third Sector Interface,
Moray
Public Public 01/04/2024 £170K UK Shared Prospertiy Funds and Care
Experienced Attainment Funds
No of mentees and mentors matched No
participating and sustaining learning,
training and work opportunities
In Year Amendments/Additions to Plans for Delivery with LA, UKSPF or Other Funding
Page 320

Page 321

NO ONE LEFT BEHIND - VOLUME PROFILES - 2024/25 (SG Funding Only)
Local Authority -
The table below records how many individual participants will access NOLB services each quarter.  Input required in white cells ONLY please
TARGET GROUP Q1 Q2 Q3 Q4
TOTAL
PARTICIPANTS
All Age Employability - Excluding Parents 90 ( new starts ) 90 90 90 270
Tackling Child Poverty - Parents 25 ( new starts ) 25 25 25 75
TOTAL PARTICIPANTS 0 115 115 115 345
Moray Council
The data in the table below (self-populated from the data you entered in
Annex B) records volumes within your specified Target Groups.  The Total
will not balance with the data in the table above as individuals could be
counted in more than one Target Group i.e. a Parent could be Disabled and
also Minority Ethnic, therefore counting in 3 Groups.
Page 321

Page 322

Volume
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0
#REF!
#REF!
#REF!
0
0
#REF!
#REF!
#REF!
All age groups and priority / equalities groups
#REF!
#REF!
#REF!
0
All age groups and priority / equalities groups
#REF!
Parents in Poverty
Parents in Poverty
Specific Target/Characteristic Groups
#REF!
Parents in Poverty
Parents in Poverty
Parents in Poverty Economically Inactive , Disability , Mental Health,. Ethnic
Minorities, Care Experienced, Long-term Unemployed,
#REF!
Page 322

Page 323

NO ONE LEFT BEHIND - FINANCIAL FORECASTS - 2024/25
Input is required in the white cells only
Budget Lines Q1 Q2 Q3 Q4 TOTAL
All Age Employability (SG funding) £146,250 £146,250 £146,250 £146,250 £585,000
All Age Employability (LG Core) £56,000 £56,000 £56,000 £56,000 £224,000
All Age Employability (UK SPF) £59,625 £59,625 £59,625 £59,625 £238,500
All Age Employability (Other) £0
All Age Employability Total £261,875 £261,875 £261,875 £261,875 £1,047,500
Tackling Child Poverty (SG Funding) £187,000 £187,000 £187,000 £187,000 £748,000
Tackling Child Poverty (LG Core) £0 £0 £0 £0 £0
Tackling Child Poverty (UK SPF) £59,625 £59,625 £59,625 £59,625 £238,500
Tackling Child Poverty (Other) £0
Tackling Child Poverty Total £246,625 £246,625 £246,625 £246,625 £986,500
Total Funding (SG Funding) £333,250 £333,250 £333,250 £333,250 £1,333,000
Total Funding (LG Core) £56,000 £56,000 £56,000 £56,000 £224,000
Total Funding (UK SPF) £119,250 £119,250 £119,250 £119,250 £477,000
Total Funding (Other) £0 £0 £0 £0 £0
Employability Funding Total £508,500 £508,500 £508,500 £508,500 £2,034,000
Page 323

Page 324

Page 324

Page 325

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 18 JUNE 2024 
SUBJECT: INFORMATION REPORT:  LIST OF PROPERTY
TRANSACTIONS CONCLUDED UNDER DELEGATED
POWERS 
BY: DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT &
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of property transactions which have been dealt with
under delegated powers. 
1.2 This report is submitted to the Economic Development and Infrastructure
Services Committee in terms of Section III F (5) of the Council's Scheme of
Administration relating to industrial and commercial development. 
2. BACKGROUND 
2.1 In terms of the Council’s Scheme of Delegation, the Head of Housing and
Property has delegated authority to approve acquisitions of heritable property
up to a value of £250,000 where appropriate provisions have been made in
the Capital or Revenue Plan.   
2.2 In terms of the Council’s Scheme of Delegation, the Head of Housing and
Property has delegated authority to conduct rent reviews and fix new rents. 
2.3 In terms of the Council’s Scheme of Delegation, the Head of Housing and
Property has delegated authority to grant leases, licenses or other occupation
agreements of land and buildings for 25 years or less duration where the
initial rent does not exceed £35,000 per annum and sites on long term
building leases of up to 125 years duration where the initial rent does not
exceed £35,000 per annum. 
2.4 In terms of the Council’s Scheme of Delegation, the Head of Housing and
Property has delegated authority to settle compensation claims to a maximum
of £100,000 arising from the Flood Prevention legislation, provided always
that payments can be accommodated within approved budgets for the
scheme or project. 
2.5 In terms of the Council’s Scheme of Delegation, the Head of Housing and
Property has delegated authority to grant wayleaves or servitudes over
Page 325

Page 326

Council owned property. 
2.6 In terms of the Council’s Scheme of Delegation, the Head of Housing and
Property has delegated authority to grant assignations of existing leases
where the terms of lease remain substantially unaltered and to authorise sub-
lets. 
3. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The proposals support the aim of delivering financial stability. 
(b) Policy and Legal
None. 
(c) Financial Implications
Funds for the acquisition of the property detailed in APPENDIX I were
made from existing provision in the Housing Revenue Account. 
The transactions detailed in APPENDICES II and III will generate an
income to the Council. 
Funds are available to meet the compensation detailed in APPENDIX
IV. 
(d) Risk Implications
None. 
(e) Staffing Implications
None. 
(f) Property
None. 
(g) Equalities/Socio Economic Impact
None. 
(h) Climate Change and Biodiversity Impacts  
None. 
(i) Consultations
None. 
4. CONCLUSION 
4.1 It is recommended that the Committee notes the 1 acquisition of
property, 15 rent reviews, 5 leases, 1 flood compensation claim, 1
servitude and 2 assignations set out in APPENDICES I, II, III, IV, V and VI. 
Author of Report: Stuart Beveridge, Asset Manager (Commercial Buildings)
Background Papers: 
Page 326

Page 327

Ref:   SB/JB 
Page 327

Page 328

Page 328

Page 329

APPENDIX I 
REPORT TO THE ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES COMMITTEE ON 18 JUNE 2024 
LIST OF ACQUISITION OF FEU - SUBMITTED FOR NOTING 
Officer
Intls
Address Description Land Owner Purchase Price Declared
Surplus
Comments
STBE  84 Douglas Crescent, Buckie 3 bedroom mid
terraced house
Macduff Shipyard
Ltd
£108,000 N/A Purchased to add to Council
Housing stock. 
Page 329

Page 330

Page 330

Page 331

APPENDIX II
REPORT TO THE ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES COMMITTEE ON 18 JUNE 2024 
LIST OF RENT REVIEWS OF BUILDINGS AND SITES - SUBMITTED FOR NOTING 
1. Ref No.
2. Valuer’s Ints.
1. Address
2. Tenant
1. Building (m²) 
2. Site (Ha)
1. Date of Entry
2. Review Period
Interval
1. Previous Rent
2. New Rent
Remarks
1. MW/630/2 
2. IAWA
1. Kinloss School Lodge,
Burghead Road, Kinloss 
2. Kinloss Crafty Cool Kids Club
1. 80sqm 
2. 0.04Ha
1. 16/2/18 
2. 3 years
1. £3,600 p.a. 
2. £5,000 p.a.
Permitted Use:
Day care/nursery
facility.
1. DU/1/304 
2. SOAND
1. 7 Dufftown Industrial Estate,
Dufftown 
2. Alan Duncan
1. - 
2. 0.22Ha
1. 3/4/09 
2. 5 years
1. £4,520 p.a. 
2. £5,500 p.a.
Permitted Use:
Classes 5 & 6 General
Industrial.
1. EL/510/1 
2. SOAND
1. Riverside Caravan Park, West
Road, Elgin 
2. Christine Mitchell
1. - 
2. 6.1Ha
1. 1/4/21 
2. 3 years
1. £14,716.24 p.a. 
2. £18,882.34 p.a.
Permitted Use:
Public non residential
caravan site with
recreation area & pony
grazing.
1. FR/520/1 
2. IAWA
1. Kiosk, Grant Park, Victoria
Road, Forres 
2. Brett Mather & Anna
Henderson
1. 22.57sqm 
2. -
1. 15/1/18 
2. 3 years
1. £2,200p.a. 
2. £2,500 p.a.
Permitted Use:
Kiosk to sell ice-cream
& other confectionery.
Page 331

Page 332

1. MO/1/101 
2. IAWA
1. 4 Mosstodloch Industrial
Estate, Mosstodloch 
2. Ian William Gordon
1. - 
2. 0.13Ha
1. 1/12/78 
2. 3 years
1. £1,838 p.a. 
2. £2,000 p.a.
Permitted Use:
Motor vehicle repairers
& industrial blast
cleaners.
1. AL/600/1 
2. ALBU
1. 2 Fields, Alves 
2. Moray Estates Development Co
Ltd
1. - 
2. 23.68Ha
1. 28/5/94 
2. 5 years
1. £3,600 p.a. 
2. £3,600 p.a.
Permitted Use:
Agricultural.
No increase in rent
justified.
1. EL/1/201 
2. IAWA
1. 3 Chanonry Spur, Elgin 
2. Iain Emslie
1. 174sqm 
2. 0.09Ha
1. 17/2/18 
2. 3 years
1. £14,600 p.a. 
2. £16,975 p.a.
Permitted Use:
Storage &
maintenance of taxi
vehicles.
1. MW/580/1 
2. STBE
1. Nether Dallachy Landfill Site,
Nether Dallachy 
2. Crown Estate Commissioners
1. - 
2. 31.54Ha
1. 1/4/93 
2. Annually
1. £24,437.50 p.a. 
2. £25,488.32 p.a.
Permitted Use:
Council landfill site.
Council is tenant of
Crown Estate
Scotland.
1. EL/5/253 
2. ALBU
1. 5 Diagonal Road, Elgin 
2. Elgin Autos Ltd (SC496553)
1. - 
2. 0.07Ha
1. 14/5/99 
2. 5years
1. £2,700 p.a. 
2. £3,030 p.a.
Permitted Use:
Use for vehicle
valeting &
maintenance in
connection with
tenant's vehicle sales
business. 
Page 332

Page 333

1. EL/3/204 
2. STBE
1. 4 Linkwood Lane, Elgin 
2. Environmental Protection
1. 110sqm 
2. 0.02Ha
1. 1/8/09 
2. 3 years
1. £8,150 p.a. 
2. £8,910 p.a.
Permitted Use:
Storage of equipment
& materials.
1. EL/8/223 
2. STBE
1. Unit 23 Tyock Industrial Estate,
Elgin 
2. City Electrical Factors Ltd
1. 282.2sqm 
2. 0.04Ha
1. 11/11/09 
2. 3 years
1. £20,500 p.a. 
2. £23,700 p.a.
Permitted Use:
Storage, distribution &
incidental sales of
electrical goods &
components (with
ancillary office & trade
counter) in connection
with tenant’s business.
The rent review is with
effect from 11/11/24.
1. KE/410/2 
2. STBE
1. Strathisla Childrens Centre,
Banff Road, Keith 
2. Flexible Childcare Services
Scotland SCIO
1. 460sqm 
2. 0.57Ha
1. 460sqm 
2. Annually
1. £10,660 p.a. 
2. £15,990 p.a.
Permitted Use:
Children’s Nursery.
Stepped rent increase
as per the lease terms.
Share of running costs
also to increase on
stepped basis from
£3,592.73 per annum
to £7,189.45 per
annum. 
Page 333

Page 334

1. KE/1/207 
2. ALBU
1. 4 & 4A Westerton Road North,
Keith 
2. Colin Gray
1. 212.6sqm 
2. 0.04Ha
1. 1/11/20 
2. 3 years
1. £12,780 p.a. 
2. £15,150 p.a.
Permitted Use:
Vehicle maintenance &
storage.
1. FR/2/100 
2. IAWA
1. 6 Greshop Road, Forres 
2. Alan Bartlett & Sons (Chatteris)
Ltd
1. - 
2. 0.75Ha
1. 1/4/89 
2. 5 years
1. £22,500 p.a. 
2. £28,775 p.a.
Permitted Use:
Food processing.
1. LO/1/106 
2. SOAND
1. Unit 6 Coulardbank Industrial
Estate, Lossiemouth 
2. Moray Motors Ltd
1. - 
2. 0.14Ha
1. 18/3/94 
2. 5 years
1. £3,870 p.a. 
2. £4,920 p.a.
Permitted Use:
Car sales, preparation,
servicing & repair &
sale of car accessories
in connection with
tenant’s business. 
Page 334

Page 335

APPENDIX III
REPORT TO THE ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES COMMITTEE ON 18 JUNE 2024 
LIST OF LEASES OF BUILDINGS AND SITES – SUBMITTED FOR NOTING 
1. Reference No. 
2. Officer’s Ints
1. Address 
2. Tenant
1. Building (m²) 
2. Site (Ha) 
1. Date of Entry 
2. Review Period
Rent
(per annum)
Remarks
1. EL/645/2 
2. SOAND
1. 232 High Street, Elgin 
2. Quarriers
1. 132sqm 
2. 0.02Ha
1. 15/4/24 
2. 3 years
£20,000 Permitted Use:  Office use
& ancillary uses as a drop-
in centre & for staff
training.
1. BK/1/209 
2. IAWA
1. 3 March Lane, Buckie 
2. MSSSAB Ltd, T/A SG
Roofing Contractor
1. 60.79sqm 
2. 0.02Ha
1. 1/4/24 
2. 3 years
£6,050 Permitted Use:  Workshop
& storage facility for the
tenant’s roofing business.
1. FR/4/206 
2. IAWA
1. 4 Waterford Circle,
Forres 
2. Connor McGowan, T/A
Timberness
1. 70sqm 
2. -
1. 22/4/24 
2. 3 years
£7,000 Permitted Use:  Workshop
and store in association
with the tenant’s joinery
business.
1. BK/1/214 
2. IAWA
1. 10 March Road East,
Buckie 
2. Iain Hutcheon
1. 74.97sqm 
2. 0.03Ha
1. 1/5/24 
2. 3 years
£6,600 Permitted Use:  Car
mechanics workshop &
yard.
Page 335

Page 336

1. EL/1/141 
2. ALBU
1. 22 Chanonry Road
North, Elgin 
2. ESL Investments Ltd
SC556361
1. - 
2. 0.147Ha
1. 2/5/24 
2. 5 years
£5,575 Permitted Use:  For trade
or business within Classes
4, 5 & 6 of Schedule to
Town & Country Planning
(Use Classes)(Scotland)
Order 1997 as amended. 
Page 336

Page 337

APPENDIX IV 
REPORT TO THE ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES COMMITTEE ON 18 JUNE 2024 
COMPENSATION - SUBMITTED FOR NOTING 
Officer
Intls
Address Description Land Owner 1. Compensation
2. 
Comments
STBE  Old Mills Road
Elgin
Grazing Land – Flood
Compensation & Path
Agreement
Hawcos 1. £20,068.45 
2.  
Flood compensation for loss of
land & disturbance
£20,068.45 + £1,920 (surveyor’s
fee). 
Page 337

Page 338

Page 338

Page 339

APPENDIX V 
REPORT TO THE ECONOMIC DEVELOPMENT & INFRASTRUCTURE SERVICES COMMITTEE ON 18 JUNE 2024 
GRANT OF SERVITUDES AND WAYLEAVES 
Officer Intls  File Ref  Address Description Price  Comments
CQ KE/GEN Site at Banff Road, Keith Servitude £0 SGN retrospective agreement to
formalize connection to new
Moray Council housing
development, Banff Road, Keith. 
Page 339

Page 340

Page 340

Page 341

APPENDIX VI 
REPORT TO THE ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES COMMITTEE ON 18 JUNE 2024 
LIST OF ASSIGNATIONS OF SITES/UNITS - SUBMITTED FOR NOTING 
1. Ref No
2. Valuer’s Ints
1. Assignor
2. Assignee
Address Lease Details Remarks
1. EL/1/134 
2. ALBU
1. ESL Investments Ltd 
2. Gairland Investments Ltd
14 Chanonry Road South,
Elgin
Lease Commenced
5/7/18
Lease Term
99(Y), 0(M), 0(D)
Rental
£14,420 
Permitted Use:
Development of a depot
with workshop, offices &
yard.
1. EL/1/131 
2. ALBU
1. ESL Investments Ltd
SC556361 
2. Gairland Investments Ltd
SC746684
Chanonry Court, 23
Chanonry Road South, Elgin
Lease Commenced
18/4/19
Lease Term
99(Y), 0(M), 0(D)
Rental
£22,625 
Permitted Use:
Development of industrial
units & stores with yard &
car parking minimum
industrial buildings
1,250sqm. 
Page 341

Page 342

Page 342