Supplementary Agenda Document Pack - Economic Development and Infrastructure Services Committee - 06/02/2024

Moray Council · 6 February 2024
Back to Economic Development and Infrastructure Services Committee — 6 February 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Economic Development and Infrastructure Services
Committee 
Tuesday, 06 February 2024 
SUPPLEMENTARY AGENDA 
The undernoted reports have been added to the Agenda for the meeting of the
Economic Development and Infrastructure Services Committee to be held at
Council Chambers, Council Office, High Street, Elgin, IV30 1BX on Tuesday, 06
February 2024 at 09:30. 
BUSINESS 
5a) Parking Enforcement
Report by Depute Chief Executive (Economy, Environment and
Finance)  
3 - 8
5b) Pavement Parking
Report by Depute Chief Executive (Economy, Environment and
Finance)  
9 - 22
5c) M.Connect Expansion
Report by Depute Chief Executive (Economy, Environment and
Finance)  
23 - 36
5d) Budget for External Consultancy Services - Phasing out
the use of Glyphosate by 2025
Report by Depute Chief Executive (Economy, Environment and
Finance)  
37 - 46
Page 1

Page 2

Summary of Economic Development and Infrastructure
Services Committee functions:
Roads Authority; Lighting Authority, Reservoirs Act 1975, Public
Passenger Transport; Flood Prevention; Twinning; Piers and Harbours
and Coast Protection; Industrial and Commercial Development;
Environmental Protection; Burial Grounds; Assistance to Industry or
Commerce; Public Conveniences; Council Transportation; Catering &
Cleaning; Land Reform (Scotland) Act 2003; Countryside Amenities;
Tourism, monitoring funding from European Programmes, youth
training and employment creation scheme and provide Architectural,
Quantity Surveying, Maintenance and Allied Property Services.     
Page 2

Page 3

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 6 FEBRUARY 2024 
SUBJECT: PARKING ENFORCEMENT 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT, AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To discuss parking concerns in Elgin Town Centre and inform the Committee
of options for short term parking enforcement in Elgin Town Centre. 
1.2 This report is submitted to Committee in terms of Section III (F) (16) of the
Council's Scheme of Administration relating to exercise the functions of the
Council under the Road (Scotland) Act 1984 and other relevant legislation and
to deal with traffic and transport management functions, including the
preparation and implementation of traffic management schemes. 
2. RECOMMENDATION 
2.1 It is recommended that Committee: 
(i)  note the contents of the report and consider the interim options
outlined in Section 4; 
(ii)  agree a preferred interim option for progression – including
further reporting and financial approvals if required; and 
(iii)  agree the long term solution is traffic control through the 
Levelling Up Fund Elgin Town Centre Masterplan project. 
3. BACKGROUND 
3.1 Council Officers are aware of continued concerns around non-compliant
parking behaviour in Elgin town centre. At the car parking stakeholder
consultation held in April 2023, it was clearly acknowledged by all parties that
the pedestrianised areas of the Plainstones and Batchen Street are being
misused for access and parking by drivers on an increasing basis. This
situation appears to be continuing into 2024. 
Item 5a)
Page 3

Page 4

3.2 The ability to put in any specific controls is limited by the current closure of
North Street for the rebuilding of the “Poundland” building which necessitates
the use of Batchen Street for through traffic. This is an exceptional situation
exacerbated by current works which have taken longer to complete than
originally anticipated. 
3.3 The long term solution for this area has been put forward as traffic control
(rise/fall bollards) as part of the wider Elgin Town Centre Masterplan project
as part of the Levelling Up Fund. Further information on locations of these and
the wider project can be found here.
https://storymaps.arcgis.com/stories/46a13bef59ed4293921e40d274963e5b.
This solution was also welcomed by the stakeholder group for the 2023 Elgin
Parking Review. 
3.4 This report is to consider whether interim short term solutions to alleviate
concerns may be suitable and achievable until the long term solution which is
focussed on changing driving behaviour and controlling traffic, rather than
enforcement, can be implemented. 
3.5 The responsibility for enforcement of on street parking offences remains with
Police Scotland, in line with the Council’s Parking Strategy (meeting of this
Committee 31 October 2017, paragraph 7 of the minute refers) and the review
of the strategy in 2023 as approved by this Committee on 5 September 2023
(para 4 of the minute refers). Ten local authorities, including Moray, do not
currently have decriminalised parking in Scotland. As such, Decriminalised
Parking Enforcement, which would be a permanent change in position is not
considered as part of this report. 
3.6 Council Officers meet regularly with colleagues in Police Scotland to discuss
priorities and issues relating to enforcement. This partnership working is
positive and acknowledges relative priorities and resourcing pressures. 
4. OPTIONS 
Do nothing / status quo 
4.1 Continue with the current situation. To do so would leave the current level of
illegal parking unaddressed, and has consequent reputational risks. As with
any non-compliant parking, this raises road safety risks. The introduction of
the new pavement parking legislation through the Transport (Scotland) Act
2019 has raised awareness of wider parking compliance issues and
expectations of solutions to these issues. 
Communication campaign 
4.2 Work with partners to produce and implement a campaign about safe and
considerate parking. This could be done via social media and paid for
advertising.  Costs would vary depending on the scale of the campaign and
the media used for any advertising. Whilst small scale activity could potentially
be carried out unfunded, this would need managing in the context of existing
work priorities and pressures. Around £10k could be an appropriate amount to
do an Elgin focussed campaign. The benefits of this are encouraging
Page 4

Page 5

compliance and increasing understanding of why parking restrictions are in
place and promoting the location of the current car parks, to ensure the town
centre is accessible for all users. This would help to demonstrate that the
Council is listening and responding to concerns raised. If this option was
preferred, this committee would have to refer the resulting funding
recommendation to Full Council for consideration and constitutes a budget
pressure as there is no existing funding stream. 
Special Constables 
4.3 Council Officers have been asked to consider whether Special Constables
could carry out parking enforcement.  Special Constables are volunteer Police
Officers, with the same powers as regular officers. These volunteers must
undergo a similar application, security vetting and training process to regular
Police Officers. This process includes, application, security vetting, initial
Police exam, interview, medical and extensive training, prior to becoming a
Special Constable. 
4.4 Dialogue with Police Scotland has been clear that, as such, Special
Constables are not recruited to undertake one task (such as parking
enforcement) but any task that would be required as part of being a Police
Officer. Most notably, Special Constables by their volunteer nature are also
often in employment and generally available in evenings, weekends and
holidays, when the parking issues in Elgin are reduced.  Further information
on becoming a Special Constable and their role is available here.
https://www.scotland.police.uk/recruitment/special-constables/ 
Funded Police Officer time 
4.5 Moray Council could provide funding to Police Scotland to fund additional
(overtime) hours as part of a memorandum of understanding or service level
agreement to undertake parking enforcement. This would be undertaken on
the understanding that it would be required to be done along with other
Policing priorities ie not limiting the requirement to respond to an emergency
situation, however, the tasking would be on a dedicated basis with an agreed
programme of activity. In that vein the Council would not pay for any hours of
enforcement activity not carried out if there had been the need for officers to
be redeployed to an emergency situation. 
4.6 At a headline level, an indicative proposal has been discussed with Police
Scotland, which would provide for an 18 month agreement, broken into three
6-month periods to allow for mutual review. The proposal sets out an average
of 25 hours of enforcement per month, which would be weighted towards the
beginning of the agreement to encourage compliant behaviour as soon as
possible. There would be an agreed programme of activity, with monthly
reviews on practical delivery, output measures (number of tickets issued) and
perceived behaviour change in terms of observations of vehicles parked
illegally in the core town centre area – particularly focussed on Batchen Street
and the Plainstones area of the High Street. This is likely to cost £20k. If this
option was preferred, this committee would have to refer the resulting funding
recommendation to Full Council for consideration and constitutes a budget
pressure as there is no existing funding stream. 
Page 5

Page 6

Contract with council to undertake Police Scotland traffic warden duties 
4.7 Police Scotland are permitted to sub contract certain functions to third party
providers, and this includes the traffic warden duties. Although Police
Scotland withdrew the provision of a Traffic Warden Service in 2014, the
statutory powers of traffic wardens still exist for utilisation by the Police. As
with the option to fund police officer time, Moray Council as a public sector
body could enter into an agreement with the Police to fund specific activities –
in this instance the employment of temporary staff to carry out traffic warden
duties. Combining these factors could see an option whereby the Police
contract with the Council to provide specific traffic warden functionality on a
short term basis in the town centre of Elgin with Police Scotland still
administering the process centrally. Initial work on this option would indicate a
higher base cost to the council than the funding of officer time set out in 4.5
above, but would have provided a greater number of hours of enforcement
cover. 
4.8  Dialogue with partners in Police Scotland have established that this option is
not aligned to the Divisional or National position of Police Scotland in relation
to parking offences, which is that these should be pursued by local authorities
taking on enforcement powers through DPE. 
4.9 Given the position of Police Scotland on this matter this option is not
recommended for further exploration, however, should Committee be minded
to have further discussions on this the matter could be referred to Police &
Fire & Rescue Services Committee. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) 
The report encompasses the main aims of the Economic Development
programme by maintaining suitable transport facilities and infrastructure
designed for their intended use. 
(b) Policy and Legal
There are legal implications depending on which option members would
like Council officers to progress with. The relevant legislation is:-
Road (Scotland) Act 1984
The Transport (Scotland) Act 2019
The Functions of Traffic Wardens (Scotland) Order 1999 
(c) Financial implications
There would be additional costs to the Council from the options for
additional action outlined in this report, which would require budget
approval from Full Council. 
Funding Police Scotland officers to do additional hours would depend on
the number of hours members wish to fund. The option set out above
has a likely cost of £20k. If this option is preferred it would require
referral to Full Council as there is no existing budget provision.
Page 6

Page 7

Communication Campaign could cost £10,000 depending on the media
chosen and amount of paid advertising used. This would need to be
approved by Full Council as there is no existing budget provision. 
When the Council approved the budget for 2023/24 on 1 March
2023 (paragraph 5 of the Minute refers) it balanced only by using
reserves and one-off financial flexibilities. The indicative 3 year budget
showed a likely requirement to continue to make savings in the order of
£20 million in the next two years. All financial decisions must be made in
this context and only essential additional expenditure should be agreed
in the course of the year.  In making this determination the committee
should consider whether the financial risk to the Council of incurring
additional expenditure outweighs the risk to the Council of not incurring
that expenditure, as set out in the risk section below and whether a
decision on funding could reasonably be deferred until the budget for
future years is approved 
(d) Risk Implications
There are reputational risks to the Council by doing nothing. These risks
will be reduced once the current street works are completed and when
the traffic control measures are implemented. The Levelling Up Fund
project should be completed by March 2026. 
(e) Staffing Implications
There would be staffing implications should there be any progression of
the option relating to taking on traffic warden duties, however, this option
is not supported by Police Scotland. 
(f) Property
There are no property implications arising from this report. 
(g) Equalities/Socio Economic Impact
There may be some impacts on the grounds of disability. Enforcing the
restrictions which are already in place may affect people with a disability
as they may not be able to get directly to the location they wish, but this
is deemed justified as a proportionate way of ensuring safety and
accessibility for pedestrians. 
(h) Climate Change and Biodiversity Impacts
There are no Climate Change or Biodiversity Impacts. 
(i) Consultations
The Depute Chief Executive (Economy, Environment & Finance), head
of Environmental and Commercial Services; Chief Financial Officer,
Legal Services Manager, Equal Opportunities Officer, Climate Change
Strategy Officer, Police Scotland and Committee Services Officer (L
Rowan) have been consulted and any comments taken into
consideration.  
Page 7

Page 8

6. CONCLUSION 
6.1 This is a short term problem due to current street works and there will
be a delay before implementation of the Levelling Up Fund Elgin Town
Centre Masterplan project, which once completed should greatly
improve the traffic movement and parking situation in Elgin. 
6.2 There are a number of potential short term options for parking
enforcement. These options will require additional revenue expenditure,
communication of the changes and working collaboratively with
partners and stakeholders. 
6.3 The long term solution is focussed on changing driving behaviour and
controlling traffic, to encourage compliance, rather than enforcement. 
Author of Report: Kelly Wiltshire, Strategic Transport Services Manager 
Background Papers: Elgin Parking Review September 2023 
Elgin Parking Strategy 2017 
Ref: SPMAN-524642768-1022 
Page 8

Page 9

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 6 FEBRUARY 2024 
SUBJECT: PAVEMENT PARKING 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT, AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of progress for the new Pavement Parking
legislation which came into effect on 11 December 2023 as part of the
Transport (Scotland) Act 2019. This gave local authorities the power to
enforce a ban on pavement parking, double-parking (more than 50cm from
the edge of a carriageway) and parking at dropped kerbs installed for
pedestrian or cycle usage. 
1.2 This report is submitted to Committee in terms of Section III (F) (16) of the
Council's Scheme of Administration relating to exercise the functions of the
Council under the Road (Scotland) Act 1984 and other relevant legislation and
to deal with traffic and transport management functions, including the
preparation and implementation of traffic management schemes. 
2. RECOMMENDATION 
2.1 It is recommended that Committee: 
(i) note the updates in the report relating to the statutory powers on
pavement parking; and 
(ii) agrees option B, the promotion of key messages and continued
partnership working with Police Scotland and others as a
proportionate response to pavement parking issues in Moray. 
3. BACKGROUND 
3.1 At the meeting of this Committee on 20 June 2023, this Committee agreed to
approve a Pavement Parking Exemption order for some exemptions to the
pavement parking legislation where for example the pavement was too narrow
for cars to park and emergency vehicles to pass (para 7 of the Minute refers).
These orders are now complete and the relevant signage and road markings
should be in place by Mid-February (subject to weather conditions). 
Item 5b)
Page 9

Page 10

3.2 This is a nationwide ban and as such some key messages, advertisements
and marketing materials have been prepared at a national level for local
authorities and others to use. These are available to view at
https://roadsafety.scot/campaigns/pavement-parking/ 
3.3 The statutory powers and accompanying regulations came into force on
11 December 2023 as part of the Transport (Scotland) Act 2019. This gives
local authorities the power (but not duty) to enforce a ban on pavement
parking. A statutory duty means that the Council must comply with the
requirements of the relevant legislation. A statutory power, as is the case with
this legislation, means that the Council has discretion whether to exercise the
power. 
3.4 Whilst pavement parking is an issue in some locations in Moray, it is not the
main parking enforcement issue.  There are wider concerns about parking
enforcement in Elgin in particular, which is being considered in a separate
report to this Committee. 
3.5 Options in response to the new power are – A) do nothing, B) promote key
messages and liaise with the Police in relation to parking that is dangerous /
causing an obstruction, C) employ officers and outsource processing to
another authority, which has decriminalised parking in place. 
(A) Do nothing 
3.6 Continue with the current situation whereby the local authority takes no role in
pavement parking matters. This is not recommended due to equality and
reputational risks. 
(B)  Promote Key Messages and liaise with Police 
3.7 This approach is recommended by officers as it would be beneficial and
proportionate to the scale of the issue.  Promoting these messages will help to
increase the awareness of the new legislation, promote understanding of why
the parking ban has come into place and reinforce the need for our
pavements to be accessible for all users and in particular our more vulnerable
road users. 
3.8 Council Officers continue to work closely in partnership with Police Scotland
and have a good positive relationship acknowledging each other’s priorities
and limitations on resources. Police Scotland do respond to calls for parking
that is dangerous or causing an obstruction. 
3.9 The key messages of a communications campaign would be that: 
• Many people face daily difficulties with pavement parking. It is dangerous
and frustrating, especially for those with impairments, wheel chair users or
those with limited mobility and those with mental health challenges. 
• People walking with young children should not be forced onto the road to
avoid vehicles parking on the footway.
Page 10

Page 11

• Pavement parking can have serious consequences and can force people
to take unnecessary road safety risks. 
• Complying with the pavement parking restrictions ensures our pavements
and roads are safer and more accessible to all.
• If a vehicle is parked dangerously or is causing an obstruction, Police
Scotland should be contacted via 101 to respond, as they do currently. 
(C) Employ officers to enforce legislation with processing outsourced 
3.10 This would involve employing dedicated officers, training, uniform, equipment
as well as contributing to the costs of a further local authority which already
had decriminalised parking powers to undertake processing of Penalty Charge
Notices. It is likely that at least two officers would be required to cover for shift
patterns and annual leave. This staff cost would be in the region of £65,000
and there is no budgetary provision for this. 
3.11 At present, whilst there are wide spread concerns about wider parking issues
and enforcement in Elgin town centre, the parking enforcement concerns
relate to a variety of issues, not just pavement parking, and are explored
further in the separate report on parking enforcement for consideration by
Committee on this agenda. 
3.12 As the legislation confers a specific power to enforce pavement parking on
Local Authorities, this option could be pursued in isolation to Decriminalisation
of Parking Enforcement, but is not advised as a proportionate response to the
scale of illegal pavement parking in Moray. If members wish to go ahead with
this option, a further report would be required to go to a future meeting of this
committee with more detailed costs on staffing, equipment required and
potential neighbouring authorities who may provide the processing and their
costs. 
3.13 In contrast, on street parking enforcement in Moray is still the responsibility of
Police Scotland. Ten local authorities including Moray, do not currently have
decriminalised parking in Scotland. Decriminalised Parking Enforcement is a
regime that enables a local authority to enforce its own parking policies,
including the issuing of Penalty Charge Notices to motorists breaching parking
controls in specified areas. This was discussed at a meeting of this committee
on 5 September 2023 as part of the Elgin Car Parking Review (para 8 of the
Minute refers) and as part of the Elgin Parking Strategy report on 31 October
2017 (Para 7 of the Minute refers) and this report does not seek to amend the
current position of council. 
4 SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The report encompasses the main aims of the Economic Development
programme by maintaining suitable transport facilities and infrastructure
designed for their intended use.  
Page 11

Page 12

(b) Policy and Legal
Pavement parking legislation which started on 11 December 2023 as
part of the Transport (Scotland) Act 2019. This give local authorities the
power (but not duty) to enforce a ban on pavement parking. Moray
Council has criminalised parking, so enforcement of on street parking is
required to be undertaken by the Police Scotland.  A statutory duty
means that the Council must comply with the requirements of the
relevant legislation. A statutory power, as is the case with this legislation,
means that the Council has discretion whether to exercise the power. 
(c) Financial implications
There are no financial implications arising from this report unless Option
(C) is preferred and this would require additional revenue budget of
around £65,000 per annum for staff.  Processing costs from another
local authority are still to be determined and would likely be on the basis
of numbers of tickets.  If members wish to go ahead with this option, a
further report would be required to Full Council and a future committee
with more detailed costs and options/availability of neighbouring
authorities. 
When the Council approved the budget for 2023/24 on 1 March
2023 (paragraph 5 of the Minute refers) it balanced only by using
reserves and one-off financial flexibilities. The indicative 3 year budget
showed a likely requirement to continue to make savings in the order of
£20 million in the next two years. All financial decisions must be made in
this context and only essential additional expenditure should be agreed
in the course of the year.  In making this determination the committee
should consider whether the financial risk to the Council of incurring
additional expenditure outweighs the risk to the Council of not incurring
that expenditure, as set out in the risk section below and whether a
decision on funding could reasonably be deferred until the budget for
future years is approved 
The Scottish Government provided a grant of £42,000 in preparation for
the introduction of the Transport (Scotland) Act 2019 and the introduction
of the new parking restrictions that were introduced as part of this act.
The funding was for the road assessment and promotion of exemption
order and implementation of these orders through the provision of road
signs and road markings. There was also capital signs and road
markings budget available to support the implementation of the
exemption orders. 
(d) Risk Implications
There is a reputational risk to the Council if option (A) do nothing is
agreed and pavement parking messaging around the reasons why
compliance is important is not carried out. 
Page 12

Page 13

(e) Staffing Implications
There are no staffing implications arising from this report unless option
(C) is agreed in which case there would be staffing implications such as
additional staff required. This is likely to be two staff based on our
current car park attendant roles. 
(f) Property
There are no property implications arising from this report. 
(g) Equalities/Socio Economic Impact
Vehicles parking either partially or wholly on the public footway can
present an obstruction to pedestrians and present a hazard to those with
restricted mobility and/or visual impairments. Promoting compliance of
this should help raise awareness of these issues and promote
compliance. The guidance provided to support the parking assessments
included a requirement to undertake Equalities Impact Assessment for
the locations where an Exemption order was promoted. An integrated
Impact Assessment has been carried out for the recommended proposal
and is available in (Appendix A). 
(h) Climate Change and Biodiversity Impacts
There are no climate change and biodiversity implications arising from
this report. 
(i) Consultations
The Depute Chief Executive (Economy, Environment & Finance), head
of Environmental and Commercial Services; Chief Financial Officer,
Legal Services Manager, Equal Opportunities Officer, Climate Change
Strategy Officer, Police Scotland and Committee Services Officer (L
Rowan) have been consulted and any comments taken into
consideration. 
5. CONCLUSION 
5.1 The focus for pavement parking compliance should be on the reasons
why the ban was put in place and promoting these messages. 
5.2 The key messages are: 
• Many people face daily difficulties with pavement parking. It is
dangerous and frustrating, especially for those with impairments,
wheelchair users or those with limited mobility and those with
mental health challenges. 
• Pavement parking has serious consequences and can force people
to take unnecessary risks. 
• People walking with young children should not be forced onto the
road to avoid vehicles parking on the footway.
• The Pavement Parking marketing campaign aims to inform the
public of the changes to ensure our pavements and roads are safer
and more accessible to all. 
Page 13

Page 14

Author of Report: Kelly Wiltshire, Strategic Transport Services Manager 
Background Papers:  Pavement Parking Exemption Order – June 2023 
Elgin Car Parking Review  - September 2023  
Elgin Car Park Strategy – October 2017
Ref: SPMAN-524642768-1016 
Page 14

Page 15

22/6/2023
INTEGRATED IMPACT ASSESSMENT COVERING 
• EQUALITIES & SOCIO ECONOMIC DUTIES
• HUMAN RIGHTS AND RIGHTS OF THE CHILD 
STAGE 1 - DO I NEED AN INTEGRATED IMPACT ASSESSMENT?   
Name of policy or proposal: 
Pavement Parking
Is this a  Mark X  below
New activity, programme or policy? x
Change to an existing activity, programme or policy? 
Budget proposal?   
Duties: tick the boxes you think apply No Maybe                                                                                                                                             Yes
Equalities: Will your proposal have an impact on groups with
protected characteristics? 
Consider the impact of your proposal on people and how they
access your services and information without barriers. 
X 
In a
positiv
e way.
Pave
ment
parkin
g ban
has
been
introd
uced
to
help
peopl
e with
disabil
ities or
other
impair
ments
to be
able
to
acces
s
pave
Item 5b)
Page 15

Page 16

22/6/2023
ments
safely.
Socio-economic 
Not every person/family has access to regular income or
savings. Will your proposal have an adverse impact on them
x  
Does your proposal impact on the human rights of people?  x  
Does your proposal impact on the rights of children and
young people 
x  
Reasoning
Briefly describe your reasoning for the responses given above: 
The report relates to the nationwide pan on pavement parking. This should help people
with disabilities In a positive way. Pavement parking ban has been introduced to help
people with disabilities and/or other impairments to be able to access pavements safely.
The report going to ED&I committee proposes to promote these key messages and to
encourage compliance with the new ban. 
If you have answered “maybe” or “yes” to any of the Stage 1 questions above
then proceed to complete the Stage 2 Integrated Impact Assessment questions
below. 
If you have answered “no” to the Stage 1 questions above then provide the details
below and submit to [email] 
Lead Officer for developing the contract  Kelly Wiltshire
Other people involved in the screening
(this may be council staff, partners 
or others i.e. contractor or community) 
Council staff, Police Scotland, Scottish
Government.
Page 16

Page 17

22/6/2023
Date 21/12/2023 
STAGE 2: INTEGRATED IMPACT ASSESSMENT 
Brief description of the affected service
1. Describe what the service does: 
This is a new nationwide ban on pavement parking (with some exemptions) to encourage
people not to park on footways and allow people to access pavements without having to
go round vehicles 
2. Who are your main stakeholders? 
Members of the public 
3. What changes as a result of the proposals? Is the service reduced or removed?
Service is not reduced or removed it is complying with new legislation. 
4. How will this affect your customers?
Drivers will not be allowed to park on pavements (unless in areas with exemption orders).
This should bring benefits to people who use pavements that they can access these
safely without having to go round vehicles and potentially having to go onto a live
carriageway. This will particularly benefit wheelchair users, people with visual
impairments and families with pushchairs. 
5. Impact on staff providing the service. No 
6. Please indicate if these apply to any of the protected characteristics
Protected groups Potential impacts and considerations
Race  No
Disability  Yes
Carers (for elderly, disabled or
minors)
Yes
Sex yes
Pregnancy and maternity (including
breastfeeding)
Yes
Sexual orientation 
Age (include children, young
people, midlife and older people)
Yes
Religion, and or belief No
Gender reassignment No
Inequalities arising from socio-
economic differences
Yes 
Page 17

Page 18

22/6/2023
Human rights
List of convention rights Describe, where applicable, if and how
specific rights are engaged  
Article 5: Right to liberty and
security
No
Article 6: Right to a fair trial No
Article 8: Right to respect for
private and family life,
correspondence and the home
No
Article 10: Freedom of expression No
Article 11: Freedom of assembly
and association
No
Article 12: Right to marry No
Article 14: Prohibition of
discrimination (in relation to the
convention rights)
No
Article 1 of Protocol 1: Protection
of property
No
Article 2 of Protocol 1: Right to
education
No
Article 3 of Protocol 1: Right to free
elections by secret ballot
No 
Children’s Rights and Wellbeing 
Relevant articles – UNCRC 
Article 2 – Non discrimination no
Article 12 – Respect of the views of the
child 
no
Article 3.1 – Best interest of the child no
Article 6.2 – Right to survival and
development
no   
7. Evidence. What information have you used to make your assessment? 
Performance data 
Internal
consultation    
Consultation with
affected groups 
Local statistics 
National
statistics
The Scottish Government have prepared marketing material to
support the introduction of the pavement parking ban.
Page 18

Page 19

22/6/2023
https://roadsafety.scot/wp-content/uploads/2023/11/Pavement-Parking-
Toolkit.pdf
Other 
8. Evidence gaps 
Do you need additional information in order to complete the information in the previous
questions?
No 
9. Mitigating action 
Can the impact of the proposed policy/activity be mitigated?  Please explain 
Promote the reasons why the pavement parking ban has been introduced and do traffic
order exemptions in locations where the road is too narrow and cars need to park on the
pavement to allow emergency vehicles to pass (this has already been done – See June
2023 ED&I committee paper which outlined the proposed exemptions 
10. Justification
If nothing can be done to reduce the negative impact(s) but the proposed policy/activity
must go ahead, what justification is there to continue with the change?  
New Pavement Parking legislation which started on 11 December 2023 as part of the
Transport (Scotland) Act 2019. 
Page 19

Page 20

22/6/2023
SECTION 3 CONCLUDING THE IIA 
Concluding the IIA 
1. No potential negative impacts on any of the protected groups were
found.
agreed
2. Some potential negative impacts have been identified.
The impacts relate to:
no 
Reducing discrimination, harassment, victimisation or other conduct
prohibited under the Equality Act 2010
n/a
Promoting equality of opportunity yes
Fostering good relations yes
3. The proposals interfere with human rights and/or the rights of the
child
no
4. Negative impacts can be mitigated the proposals as outlined in
question 9.
yes
5. The negative impacts cannot be fully mitigated but are justified as
outlined in question 10. 
yes
6. Further consultation with affected groups is needed. no
7. It is advised not to go ahead with the proposals. no 
Decision
Set out the rationale for deciding whether or not to proceed with the proposed actions: 
This is a nationwide ban on pavement parking which should help to reduce inequalities
and make pavements more accessible for all
Date of Decision: 21/12/2023 
Page 20

Page 21

22/6/2023
Sign off and authorisation: 
Service Economy, Environment and Finance
Department Transportation
Policy/activity subject to IIA Pavement Parking Ban
We have completed the integrated impact
assessment for this policy/activity. 
Name: Kelly Wiltshire
Position: Strategic Transport Services
Manager
Date: 21/12/2023
Authorisation by head of service  Name: Nicola Moss
Position: Head of Service
Date: 10.1.24
Permission to publish on website - 
Please return this form to the Equal Opportunities Officer, Chief Executive’s Office. 
Page 21

Page 22

Page 22

Page 23

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 6 FEBRUARY 2024 
SUBJECT: M.CONNECT EXPANSION 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT, AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of operational plans in relation to expanding
m.connect services into weekends and exploiting opportunities to support the
work place journey in Moray, all of which is included in the project plans within
the Moray Growth Deal.   
1.2 This report is submitted to Committee in terms of Section III (F) (18) to
exercise the function of the council in relation to public passenger transport
under the Transport Act 1985. 
2. RECOMMENDATION 
2.1 It is recommended that committee grant delegated authority to Head of
Environmental and Commercial Services in consultation with the Chair
of this Committee and the Chief Financial Officer to introduce additional
bus service routes and, or resources, supporting major events (Whisky
festival etc.) and the workplace journey in Moray through evidenced
need and demand by event organisers and local employers on a cost
neutral basis as set out in paras 3.10-3.11.   
3. BACKGROUND 
3.1 The Bus Revolution project is part of the Moray Growth Deal and aims to
improve public transport connectivity across Moray by providing additional
demand responsive transport, improving the ease of use of public transport by
the introduction of app based technology, and reducing carbon emissions by
the use of fully electric bus vehicles.  
Item 5c)
Page 23

Page 24

3.2 The project builds on the previous Dial M demand responsive service (now
m.connect), to extend hours of operation, and particularly aims to tackle
transport barriers to employment. There will be three key funding phases
throughout the 10 year span of the Growth Deal, each giving the opportunity
to provide additional vehicle resource for expanding service provision, with a
long term aim of providing services seven days per week from early morning
to late evening. However, expansion of services is anticipated on an
incremental basis to enable deliverable growth. 
3.3 Phase 1 of project delivery, introduced m.connect services across Moray on
the 2 May 2023, which included the implementation of a real-time booking and
management system and the release of a passenger app for customers to
plan, book, pay and manage their journeys. Initial service expansion (through
extended operating hours) was focussed in Buckie, Keith and Speyside,
providing on-demand bus services from 0630-2030hrs Monday to Friday. The
introduction of service 309, linking Cullen, Buckie and Keith to the rail network
was also introduced alongside an enhanced 366 service that serves Aberlour,
Knockando and Archiestown into Elgin Monday to Friday (formerly Mondays
and Wednesdays only). 
Progress to date 
3.4 Since the introduction of the enhanced m.connect services, passenger growth
has already surpassed the annual growth target set within the Full Business
Case Investment objective 1: Increase public transport passenger journeys by
30,000 per annum by 2030, (4286 additional journeys for FY23-24). To date
journey growth has increased by 7685 journeys (May-Dec) with over a third of
customers using the passenger app to manage their journey needs.
Investment objective 2: To reduce the environmental impact of transport in the
area by 30t CO2e p.a. by 2030, has also surpassed the annual target for
C02e reductions (4.3tC02e reduction target for FY 23-24), creating a saving of
7.6 tC02e to date. The final project objective, 20% reduction in number of
people facing transport barriers to employment, education or recreation by
2030, continues as work in progress and forms part of the reason for this
report. Target income on bus service provision directly addressing the journey
to work via employers has not been met as the original opportunities
anticipated with specific employers have not come to fruition, however,
specific actions to address this aspect of the project are being developed by
the project board. 
3.5 As part of the phased approach to continued expansion to meet the full project
objectives, further service expansion is currently being analysed and
considered. This will be subject to future reports to this committee. 
Page 24

Page 25

Demand Analysis
3.6 In looking at the next phase of service expansion, evening and weekend
operating hours have been considered (both being part of the long term
proposed development of m.connect bus services). The m.connect booking
and management system provider (Liftango) prepared an analysis document
of service performance to date, showing detailed analytics of demand profile,
ride sharing, vehicle utilisation, trip location and booking success rates. This
information, along with survey responses and benchmarking Forres Saturday
on-demand service information has generated confidence in weekend service
expansion proposals.   
3.7 A review of existing weekend bus services available in Buckie, Keith and
Speyside at present evidences further that there is a need for m.connect
expansion to provide public bus service supporting those accessing
employment and /or recreational facilities. The community engagement
conducted prior to phase one delivery also remains relevant with regards to
weekend bus service developments within the project scope. This serves to
provide an update to members on project progress and as background
information prior to any future committee reports. 
Potential Further Flexible Service Expansions 
3.8 The project team have been engaging with local employers and event
organisers in Moray to evaluate if current service designs support event
timings, shift patterns, demand and need. This work helps evidence reducing
those existing barriers that m.connect can mitigate now and in future phases.
It has also allowed m.connect to assess the use of existing resource to meet
rapidly developing opportunities to support major events and local business in
Moray. This can be achieved by either enhancing existing provision through
additional vehicle deployment on a particular service, or design of bespoke
public service routes through consultation. This would help events and
employers be better connected while assisting with the environmental
challenges faced to reduce carbon emissions and encouraging modal shifts
from the routine car journey to use of public transport in line with the
expectations of the full business case. 
3.9 In this vein, the organisers of the Spirit of Speyside whisky festival have
requested m.connect support for this year’s event – this would see weekday
utilisation of the service, but also a first step into weekend operations at the
time of the festival. This would be in line with the budget neutral terms of the
delegated authority request. 
3.10 Allowing the Head of Environmental and Commercial Services delegated
authority to use available resources to introduce smaller scale additional bus
service routes in response to well evidenced demand and need would not
only help the local business community meet environmental commitments, it
would create additional income for m.connect services, improve confidence in
the local bus network and connect residents of Moray with major events and
employment opportunities through improved connectivity. 
Page 25

Page 26

3.11 All additional service route opportunities brought forward using this flexible
approach would be consulted on with the Chief Financial Officer and Chair of
this committee, and assurance given that additional services would only be
activated on a cost neutral basis, where the predicted income is
commensurate with the uplift in operational costs, limiting financial risk to the
council. 
Regulatory Application Process
3.12  Bus services are governed by regulatory permissions via the Traffic 
Commissioners office, which have a lead in time of 10 weeks to gain
consents. With this time frame in mind, this report seeks approval of the
above delegated authority request to allow for timely completion of service
registration processes in relation to the whisky festival. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The proposals, which fit within the inclusive economic growth principles
of the Growth Deal support the council’s priority for a growing and
diverse economy, as well as supporting health and wellbeing through
access to services. 
(b) Policy and Legal
The proposed amendments fit within the Scottish Government’s
transport policy priorities, and the objectives established in Moray’s
Growth Deal. Bus services operated by the council are regulated through
s19 and s22 permits and registration of services with the Traffic
Commissioner. Future services may utilise the powers in the Transport
(Scotland) Act 2019 which allow use of O Licensed operations, however,
this statutory power has still to be enabled. Both s19 & s22 and O
Licensed operations still require registration of local bus services, and
the Traffic Commissioner holds the regulatory role in all these regards 
(c) Financial implications 
Any financial implications of this report are on a budget neutral basis. 
(d) Risk Implications
The principal commercial and reputational risks have been evaluated as
part of the Full Business Case.  There are reputational risks around
service development that is not in line with community expectations, and
this has been mitigated by detailed service analysis and previous
community engagement activity. Risks around growth in passenger
numbers and income will be monitored through the Project Board and
performance reporting. 
(e) Staffing Implications
There are no staffing implications arising from this report.  
Page 26

Page 27

(f) Property
There are no property implications relating to this report. 
(g) Equalities/Socio Economic Impact
The project aims to reduce inequalities through the provision of
accessible and affordable transport options, particularly tackling barriers
to employment. A full Equalities Impact Assessment has been carried
out as part of the project. 
(h) Climate Change and Biodiversity Impacts
The project has established objectives and measurements relating to a
positive impact on the environment and a reduction in carbon emissions. 
(i) Consultations
The Depute Chief Executive (Economy, Environment and Finance),
Head of Environmental and Commercial Services, Legal Services
Manager, Chief Financial Officer, Community Support Unit
Manager, Equalities Officer and L Rowan, Committee Services Officer
have been consulted and their comments incorporated into this report. 
5. CONCLUSION 
5.1 This report seeks approval to grant delegated authority to the Head of
Environmental and Commercial Services to introduce additional bus
service routes, supporting the workplace journey in Moray through
evidenced need and demand by local employers. 
Author of Report:  Stevie Robertson Senior Project Officer (Bus Revolution)  
Background Papers: 
Ref: SPMAN-524642768-1027 
Page 27

Page 28

Page 28

Page 29

Appendix 1 
Bus Revolution - Phase 1a Weekend service option appraisal     
Speyside 691 Service 
Project Board to consider the m.connect analysis provided by Liftango when deciding number of
vehicles to operate a Saturday service in the 5 on-demand areas in Moray (Speyside, Buckie, Keith,
Egin & Forres).
Current demand profile: 
The balance of supply and
demand is reflected somewhat
in the trip acceptance and
rejection statistics. The image
above shows that the “service
rejected” peak, i.e. unavailability
of trips, is between 9-11am. This
implies a lack of capacity available at this time, which is further reflected by very strong utilization in
the Elgin and Keith services during this period. The “rider rejected” peak is between 10am and 1pm
and increases towards 1pm, as supply is being removed from the service. This implies that
passengers are being offered alternative trips which do not suit their travel needs. In the late
afternoon demand is lower however “service rejected” is on a 1:1 basis implying that a lack of
capacity occurs again at this time. 
Each zone has its own characteristics. Forres for example is
relatively small and has higher convergence of trip
requests than Speyside which is larger and less dense,
particularly at the core of the zone. This leads to
differences in trip booking success. Keith and Speyside
consistently have the highest booking success rate.   
The image to the left shows the trip paths over a multi-
month period. Quick visual analysis shows the difference
in movement patterns of the Speyside service.  In
Speyside there is sufficient supply of vehicles from Mon-
Fri, yet at peak times of demand (see demand profile
above) the zone structure works against booking success.  
Speyside has 3-4 vehicles available with plenty capacity,
has low demand with a complex zone. All factors that
have led to high booking success rate in general.  
Current Speyside (Mon-Fri Service) monthly average passenger figures sit at 395, equating to an
average of 19 passengers a day. 
Item 5c)
Page 29

Page 30

Buckie 694 Service 
Current booking success in Buckie is the lowest In Moray alongside Elgin. 
Keith 696 Service 
The image above right shows the trip paths over a multi-month period in Buckie and Keith. Again, the
movement patterns for Mon-Fri Buckie service are spread meaning that the current 2 vehicles need to
cover a broader range of movements and limit ride sharing opportunities and thus reducing booking
success.
Demand profile follows the same pattern as identified for Speyside. 
Current Buckie (Mon-Fri Service) monthly average passenger figures sit at 242, equating to an average of
12 passengers a day. 
Demand for the service overall is strongest in the morning across all categories and tapers through the
afternoon. This may be a reflection of true demand; however, it is important to note that supply in the highest
demand locations (Elgin and Keith) is heavily skewed to the morning. 
Page 30

Page 31

Current Keith (Mon-Fri Service) monthly average passenger figures sit at 233, equating to an average
of 11 passengers a day. 
Elgin 697 Service 
This balance of supply and demand is
reflected somewhat in the trip
acceptance and rejection statistics. The
image above shows that the “service
rejected” peak, i.e. unavailability of
trips, is between 9-11am. This implies a
lack of capacity available at this time,
which is further reflected by very strong
utilisation in the Elgin and Keith services during this period. The “rider rejected” peak is between
10am and 1pm and increases towards 1pm, as supply is being removed from the service. This implies
that passengers are being offered alternative trips which do not suit their travel needs. In the late
afternoon demand is lower however “service rejected” is on a 1:1 basis implying that a lack of
capacity occurs again at this time
The image above left shows the trip paths over a multi-month period in Keith. This is movement patterns for Mon-
Fri Keith service and has demand in Cullen, Rothiemay, Mulben and Dufftown, all of which is over and above the
journeys within the Keith and Fyfe Keith.  This spread shows that the current 1 vehicle set up works very hard and
misses demand as shown in the image to the right (Warning Triangles within the yellow band is unallocated
journeys that have been requested but can’t be matched to available capacity). 
Analysis of unallocated rides indicates a consistent pattern of rides being unfulfilled in Forres, Elgin and Keith
regions. In each of these zones, bus availability windows are quite small, meaning that demand must be forced
into the available periods. Particularly in periods with a single vehicle operating, the ability to serve these trips is
much lower due to a combination of low capacity, and dissimilar ride requests (1 vehicle can’t be in 2 places). 
Page 31

Page 32

Current booking success in Elgin is the lowest In Moray
alongside Buckie. 
Visual analysis shows the difference in movement patterns
between the Forres service and Elgin service. The Elgin
service has 4 larger groupings, meaning that vehicles need to
cover a broader range of movements in a larger zonal area.  
The Zone set up along with the limited vehicle hour’s
impacts on the ability to meet current demand and reduces the booking success rate as shown in the
booking status chart above.   
Analysis of unallocated rides show a consistent pattern of rides being
unfulfilled in Elgin. Vehicle availability windows are quite small,
meaning that demand must be forced into the available periods.
Particularly in periods with a single vehicle operating, the ability to
serve these trips is much lower due to a combination of low capacity,
and dissimilar ride requests (1 vehicle can’t be in 2 places). 
Current Elgin (Mon-Fri Service) monthly average passenger figures sit at 420, equating to an average
of 20 passengers a day. 
m.connect Scheduled services
The board may also wish to consider introducing service routes into weekend service operation as an
alternative solution or as part of a scheduled and on-demand service mix. All service costs based on
Diesel vehicle use due to the current timetable commitments (does not accommodate charging
time). Four service routes have been identified for consideration; these are:
Service 309 – Cullen-Buckie-Keith
The existing timetable, as shown below; can be replicated or amended to accommodate an
alternative service pattern.
Page 32

Page 33

Current 309 (Mon-Fri Service) monthly average passenger figures sit at 510, equating to an average
of 24 passengers a day. 
Service 314 – Forres Town service 
One of the authority’s most popular services.  Existing timetable displayed below but can be
amended to remove current schedule gaps for Home to School Transport (HTS). 
Page 33

Page 34

Current 314 (Mon-Fri Service) monthly average passenger figures sit at 1122, equating to an average
of 53 passengers a day. 
Service 334 – Elgin-Lhanbryde-Kingston
Another popular service provided.  Existing timetable would generate familiarity with existing
customer base, but here is a real opportunity to review and develop the timetable to accommodate
additional rotations within the operating period covered.   
Page 34

Page 35

Current 344 (Mon-Fri Service) monthly average passenger figures sit at 1130, equating to an average
of 54 passengers a day. 
Service 366 – Aberlour-Knockando-Elgin
Added to consider the U22 working and leisure market from Speyside. The 5 days service has yet to
yield stronger patronage since the service uplift, however, a weekend service may well improve this.
The current timetable may require a review and include additional evening journeys. 
Current 366 (Mon-Fri Service) monthly average passenger figures sit at 211, equating to an average
of 10 passengers a day. 
Page 35

Page 36

Page 36

Page 37

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 6 FEBRUARY 2024 
SUBJECT: BUDGET FOR EXTERNAL CONSULTANCY SERVICES –
PHASING OUT THE USE OF GLYPHOSATE BY 2025 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT, AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To ask the Committee to consider options relating to the Council’s current
methods of weed control and phasing out the use of Glyphosate, as requested
by this Committee on 7 February 2023. 
1.2 This report is submitted to Committee in terms of Section III (F) (11) of the
Council's Scheme of Administration relating to exercising functions in relation
to parks, open spaces and woodland management and maintenance. 
2. RECOMMENDATION 
2.1 It is recommended that Committee: 
(i) note the contents and wider context of the report; 
(ii) consider whether to pursue option 1 or option 2 at para 3.8; 
(iii) If option 2 is preferred: 
a. consider whether the project specification in the appendix
meets the requirements of the Committee and; 
b. if the specification is agreed, agree to recommend to Full
Council that an allocation of a budget of £50k from reserves is
approved, to fund external consultancy services to review the
Council’s current weed control methods and detail, through a
report and costed action plan, how the Council can phase out
the use of Glyphosate by 2025.  
Item 5d)
Page 37

Page 38

3. BACKGROUND 
3.1 On 7 February 2023, this Committee considered a report on the Use of
Glyphosate (weed killer) in open spaces (Paragraph 14 of the minute refers)
and agreed to: 
• note that, although there are public concerns, Glyphosate is legally 
approved for use in Great Britain until December 2025 and that it 
continues to be the most cost effective and efficient method of 
managing weeds; 
• approve the proposals to reduce the use of Glyphosate through a 
managed approach in certain settings as outlined in the report, and 
note that, whilst these can be introduced without additional cost, a 
greater presence of weeds and longer vegetation would need to be 
accepted and tolerated within the environment; 
• note that Officers will continue to monitor the cost and effectiveness of 
alternative approaches of weed control; 
An agreed amendment to the recommendations requested: 
• that a further report be brought to a future meeting of this 
Committee detailing how Glyphosate will be phased out by 2025. 
3.2 The Head of Environmental and Commercial Services advised the Committee
that a budget would be required to resource the preparation of a report
detailing how Glyphosate will be phased out by 2025, and that approval would
need to be sought from Full Council given that there is no allocated budget to
do this nor any internal capacity or expertise to undertake such a study. 
3.3 The proposed scope of external services is outlined at APPENDIX A.  Whilst
the cost for this service will not be known until a tender is produced and
published to the external market to achieve best value, it is estimated that a
budget of £50k would be required to deliver this scope of work. This is based
on previous scopes of work issued by both this Council and other authorities.   
3.4 Following the report to this Committee on 7 February 2023 the Open Spaces
team amended its working practices throughout the spring/summer of 2023 to
reduce the amount of glyphosate used on Council open spaces.  This resulted
in a reduction of 993.5 litres equating to a 49% reduction.  The alternative
practices included: 
• ceasing application of glyphosate around the base of trees;
• ceasing application of glyphosate around obstacles (benches, signs);
• ceasing application in play areas where grass matting and rubber 
crumb surfacing are installed. 
3.5  As reported to this Committee on 7 February 2023 there are a number of
alternatives to the use of herbicides containing glyphosate including: thermal
controls (flame, hot water and/or foam), acetic acid (active ingredient in
vinegar), manual controls (hand, tool or machinery removal), fatty acids
Page 38

Page 39

(pelargonic acid) and electricity.  As previously reported each alternative
method has their pros and cons with none currently considered suitable as a
direct cost effective or efficacious replacement for glyphosate based
herbicides. 
3.6 APSE advice is that the use of alternatives to Glyphosate will add to revenue
costs for weed control (including labour, materials, vehicles, and fuel), with
many requiring capital investment. Officers continue to monitor experiences of
other local authorities through the APSE member network and trade journals
and have noted to date that in general others have found alternatives to be
less effective, more costly and labour intensive, and that alternative methods
of control could increase labour and costs manifold. 
3.7 As reported to this Committee on 7 February 2023 the Open Space team 
does not have the capacity, information or full knowledge of the alternatives to 
glyphosate in order to produce an action plan for removing the use of 
glyphosate.  The services of an external consultant are therefore required to 
produce a developed and fully costed action plan.  The plan would include 
addressing the following headline areas:  
• review the Councils current methods of weed control;
• use of Herbicides with Glyphosate;
• review of potential alternatives to replace the use of herbicides;
• develop and cost an integrated weed management action plan for 
Moray detailing how it can phase out the use of Glyphosate by 2025. 
3.8  Giving consideration to the information contained within this report Committee
has a number of options available with regards how to progress with regards
reducing the use of glyphosate.  The options are detailed below: 
• Option 1: Recognise the significant progress that has been made with
regards reducing the usage of glyphosate, and that there are
challenges with making further progress, and as such defer further
action until November 2024 to review the regulatory landscape (ie to
see whether there is the potential for an extension to licensed use
beyond 2025 as is now the case in Europe) and progress made by
other organisations which will inform our working practices, costs to
determine our own pathway to cease use and decision making. In the
intervening period Officers will continue to work proactively across its
partner networks to keep abreast of alternative methods and
encourage collaboration on the alternative solutions. 
• Option 2: Make further progress on a costed action plan, recognising
the resourcing and expertise issues previously set out to Committee,
and approve the commissioning of an external provider to produce
fully developed and costed action plan for review by Committee
Page 39

Page 40

4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Enhancing biodiversity delivers a wide range of social and environmental
benefits that will support corporate and community planning objectives. 
Environment – looking after the world we live in to protect it for the
future. We want to encourage everyone to take small steps to preserve
and protect our environment as we go about our daily activities 
(b) Policy and Legal
The Council’s Open Space Strategy aims to ensure public open spaces
in Moray are of sufficient quality and distribution to meet the needs of
local communities and local biodiversity. 
There are no direct legal implications. Glyphosate is currently legally
approved for use in Great Britain 
(c) Financial implications
There is currently no budget allocated or available to procure external
services to undertake this work.  It is currently estimated that a budget of
£50k is needed to deliver this scope of work.   
When the Council approved the budget for 2023/24 on 1 March
2023 (paragraph 5 of the Minute refers) it balanced only by using
reserves and one-off financial flexibilities. The indicative 3 year budget
showed a likely requirement to continue to make savings in the order of
£20 million in the next two years. All financial decisions must be made in
this context and only essential additional expenditure should be agreed
in the course of the year.  In making this determination the committee
should consider whether the financial risk to the Council of incurring
additional expenditure outweighs the risk to the Council of not incurring
that expenditure, as set out in the risk section below and whether a
decision on funding could reasonably be deferred until the budget for
future years is approved. 
It is anticipated that there will also be an on-going budget pressure from
additional cost of alternative methods of weed control but this will be
dependent on the options developed by the consultant, if approved. 
(d) Risk Implications
Given increasing public concerns over the use of Glyphosate to control
weeds in open spaces there is a potential reputational risk to not
considering further approaches to reduce or eliminate its use. There is
however a risk to biodiversity by phasing out glyphosate too soon if there
is no effective alternative for control of invasive non-native species 
The Association of Public Sector Excellence (APSE) have advised local
authorities that alternative methods of weed control are more expensive
and sometimes not as effective than the current method of control and
therefore there is a risk that additional revenue and capital budgets for
Page 40

Page 41

labour, plant and equipment will be required to implement the costed
action plan resulting from this scope of work, and to achieve the
objective of phasing out the use of Glyphosate by December 2025.   
In terms of option 1, there is a risk that the Councils implementation of
alternative working practices from December 2025 could be delayed,
were it necessary to procure equipment to facilitate the alternative
working methods which have extended lead times for delivery. However,
at this stage this risk cannot be quantified.   
If an extension to licensed use is granted, then spend in terms of option
2 would be discretionary rather than essential at this point.  Should
Moray not then cease all use by December 2025 on a discretionary
basis, there is a risk that products and practices have moved on by the
revised statutory deadline such that the approach per the specification
would then require further review. 
(e) Staffing Implications
There is no available staff capacity or budget to research or adopt
alternative methods of control.   
(f) Property
Weed control around fixed infrastructure and buildings is currently in
place to help reduce damage to infrastructure. 
(g) Equalities/Socio Economic Impact
The recently agreed reductions in the use of Glyphosate helps to support
increasing biodiversity and contribute to community health and wellbeing
by reducing inequalities of access to nature.   
(h) Climate Change and Biodiversity Impacts
Reduction in the use of herbicides including Glyphosate support
mitigation of, and adaptation to, the climate and biodiversity crisis. The
Council has recognised the biodiversity crisis through the Climate
Change Strategy, Nature Emergency, and its support of the Edinburgh
Declaration on Biodiversity. The negative impact of glyphosate is
particularly relevant to pollinators, especially bees, which are under a
number of growing pressures and the resulting pollinator decline will
have risks to human food systems. Flowering ‘weeds’ are an important
food source for pollinators which in turn hold up human food systems
and much more, so there is benefit from leaving them to grow wherever
possible. Therefore, attempts to reduce the use of glyphosate should be
supported. However it is important to acknowledge the role glyphosate
plays in managing invasive no-native species (INNS) – particularly
Japanese Knotweed and Giant Hogweed. A balance needs to be struck
as INNS have significant negative effect on biodiversity which is likely to
worsen with climate change. The costs of dealing with INNS are
currently £343 million per year in Scotland alone. Properly applied,
glyphosate is one of the few really effective way to treat these plants.
Page 41

Page 42

(i) Consultations
Depute Chief Executive (Economy, Environment and Finance), Head of
Environmental & Commercial Services, Principal Climate Change
Strategy Officer, Legal Services Manager, Chief Financial Officer,
Committee Services Officer (L Rowan), Head of Housing and Property,
Roads Maintenance Manager and Equal Opportunities Officer have been
consulted and comments received have been incorporated into the
report. 
5. CONCLUSION 
5.1 The Environmental Protection Service does not have an allocated
budget or resource to review the Council’s current weed control
methods and detail how the Council can phase out the use of
Glyphosate by 2025 as requested by the this Committee on 7 February
2023.   
5.2 An estimated budget of £50k would need to be approved from reserves
to procure external professional services to undertake this action. 
5.3 Alternative methods of weed control are anticipated to be more
expensive and would therefore likely require a future increase in
revenue and capital budgets to implement the findings from this scope
of work. 
5.4 Against this background, there may be benefits in waiting for larger
better resourced authorities to lead developments in response to the
2025 deadline from which Moray could learn, as well as deferring non-
essential spend until it is clear whether the UK will follow Europe in
extending licensed use. 
Author of Report: James Hunter, Open Space Manager 
Background Papers: Use of Glyphosate to Control Weeds in Open Space
Report 
Ref: SPMAN-524642768-1014 
Page 42

Page 43

Appendix A
Scope – Weed Control Review
Background
Moray Council’s Economic Development and Infrastructure Committee of 7 February
2023 considered a report on the Council’s use of Glyphosate to control weeds in open
spaces and accepted the recommended proposals to reduce the use of Glyphosate in
certain settings through a managed approach without additional cost to the Council.
Following consideration, the Committee agreed to:
(i) note that, although there are public concerns, Glyphosate is legally approved for
use in Great Britain until December 2025 and that it continues to be the most
cost effective and efficient method of managing weeds; 
(ii) approve the proposals to reduce the use of Glyphosate through a managed
approach in certain settings, and note that, whilst these can be introduced
without additional cost, a greater presence of weeds and longer vegetation
would need to be accepted and tolerated within the environment; 
(iii) note that Officers will continue to monitor the cost and effectiveness of
alternative approaches of weed control; and 
(iv) that a further report be brought to a future meeting of this Committee detailing
how Glyphosate will be phased out by 2025. 
Also, on 3 February 2023 Moray Council declared a Nature Emergency. The
declaration recognises the current state of nature, its intrinsic value to society and
highlights the urgent need to aid its recovery and restoration, which in turn plays a
part in recognising climate targets.  The Council also welcomed the Scottish
Biodiversity Strategy, which brings statutory targets for public authorities, to meet the
challenges of the nature crisis. 
In addition, the Council’s Economic Development & Infrastructure Committee agreed
a Nature and Biodiversity Position Statement at its meeting on 2 May 2023.  This
includes an action to increase nature positive management of council land. 
The Council’s Environmental Protection/Open Space service manages and
maintains parks, amenity green spaces, core paths, woodlands, and burial grounds.
This includes circa:  65 Schools, 74 football pitches, 700 hectares of grass, 105,000
m2 shrub beds, 11,000 m2 rose beds, 5,000 m2 annual flower beds, 60,000 m2
hedges, 964 core paths totalling over 1,000 kilometres of path, 260 litter bins, 1000
park benches, 120 picnic benches, 118 fixed outdoor play areas, 19,000 m2
woodchip safety surfacing, 210 hectares of community/amenity woodlands, control of
non-native invasive species, 65 Burial grounds and 44 war memorials.
Brief 
Moray Council wishes to procure external services to:
Item 5d)
Page 43

Page 44

1.  Review the Council’s current methods of weed control:
• Identify and quantify the range of weed control processes (sweeping,
herbicide applications, manual removal etc.) being undertaken by the
Council’s operational services, including Open Space Operations and Waste
Services Operations 
• Outline the benefits, challenges and risks with the current processes.
• Identify any improvements relating to the processes
• Undertake an Environmental Impact Assessment of the current processes
used. This should include carbon emissions, waste production and
biodiversity and climate change impacts 
2. Use of Herbicides with Glyphosate 
• Carry out a review of the current position regarding products containing
Glyphosate and detail the benefits, challenges and risks of using this type of
product
3. Review of potential alternatives to replace the use of Glyphosate
• Identify measures currently being applied by other local authorities within
Scotland and outline any benefits, challenges and risks
• Identify measures currently being applied outwith Scotland and outline the
benefits, challenges and risks
• Undertake a cost comparison between each method, broken down into plant,
labour and materials for each option and including both revenue and capital
costs
• Undertake an Environmental Impact Assessment of the potential alternative
methods of control. This should include carbon emissions, waste production
and biodiversity and climate change impacts
4. Develop and cost an integrated weed management action plan for Moray
detailing how it can phase out the use of Glyphosate by December 2025:
• Outline the benefits, challenges and risks with this alternative approach 
• Develop a costed action plan to identify and detail the actions and changes
the Council must make to phase out the use of Glyphosate by December
2025. To include options for managing invasive non-native species.
• Costs must include all capital costs and annual revenue costs to clearly detail
the financial benefits and / or implications compared to current costs and
methods of control – this should include costs for labour, vehicles, plant, fuel
and material
• Undertake an Environmental Impact Assessment for the integrated weed
management action plan and approach. This should include carbon emissions,
waste production and biodiversity and climate change impacts
• Set out key information on risks/benefits of removing the use of all herbicides
for weed control 
Page 44

Page 45

Note:  
• It is anticipated that a committee report covering all areas of the review scope
would be developed as a result of this study. This would likely be reported to a
future council / management meeting for consideration
• Sources for references made to other case studies should be included along
with scientific data to objectively demonstrate the effectiveness and success
rates for each of the options.  The inclusion of visuals to illustrate the methods
of control and before, during and after treatments is expected to be included.
• Proposals must align with national policies and legislation, including the
Scottish Biodiversity Strategy
• Risks should include the link to some forms of cancer, impacts on biodiversity
including pollinators       
Page 45

Page 46

Page 46