Democracy Spraffa

Agenda Document Pack - Economic Development and Infrastructure Services Committee - 06/02/2024

Moray Council · 6 February 2024
Back to Economic Development and Infrastructure Services Committee — 6 February 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Economic Development and Infrastructure Services
Committee 
Tuesday, 06 February 2024 
NOTICE IS HEREBY GIVEN that a Meeting of the Economic Development and
Infrastructure Services Committee is to be held at Council Chambers, Council
Office, High Street, Elgin, IV30 1BX on Tuesday, 06 February 2024 at 09:30. 
BUSINESS 
1 Sederunt 
2 Declaration of Group Decisions and Members Interests * 
3 Minute of Meeting dated 14 November 2023 7 - 14
4 Written Questions ** 
5 Notice of Motion - Councillors Van Der Horn and
Morrison
Electric Vehicle (EV) charging over public footways from home  
15 - 16
6 Kingston Coastal Erosion
Report by Depute Chief Executive (Economy, Environment and
Finance)  
17 - 26
7 Moray Hydrogen Strategy Update
Report by Depute Chief Executive (Economy, Environment and
Finance)  
27 -
128
8 Elgin Business Improvement District - Renewal Ballot
Report by Depute Chief Executive (Economy, Environment and
Finance)  
129 -
136
Page 1

Page 2

9 Question Time ***
Consider any oral question on matters delegated to the Committee in
terms of the Council's Scheme of Administration. 
Information Reports - Not for Discussion at this Meeting
Any member wishing to call in a noting or information report from one
meeting shall give notice to Committee Services at least 48 hours
before the meeting for which the report is published. The Notice shall
be countersigned by one other elected member and shall explain the
reason for call in including any action sought.   
Information Report - Environmental Standards Scotland
Improvement Report
Report by Depute Chief Executive (Economy, Environment and
Finance)  
137 -
142 
Information Report - List of Property Transactions
Concluded Under Delegated Powers
Report by Depute Chief Executive (Economy, Environment and
Finance)  
143 -
164 
Information Report - SSEN Community Resilience
Funding
Report by Depute Chief Executive (Economy, Environment and
Finance)  
165 -
178 
Summary of Economic Development and Infrastructure
Services Committee functions:
Roads Authority; Lighting Authority, Reservoirs Act 1975, Public
Passenger Transport; Flood Prevention; Twinning; Piers and Harbours
and Coast Protection; Industrial and Commercial Development;
Environmental Protection; Burial Grounds; Assistance to Industry or
Commerce; Public Conveniences; Council Transportation; Catering &
Cleaning; Land Reform (Scotland) Act 2003; Countryside Amenities;
Tourism, monitoring funding from European Programmes, youth
training and employment creation scheme and provide Architectural,
Quantity Surveying, Maintenance and Allied Property Services.     
Page 2

Page 3

Page 3

Page 4

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how
the individual or members of the group will vote on any item(s) of business on
the Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any
relevant and competent business within the specified remits not already on the
agenda, to the Chair provided it is received by the Proper Officer or Committee
Services by 12 noon two working days prior to the day of the meeting.  A copy
of any written answer provided by the Chair will be tabled at the start of the
relevant section of the meeting.  The Member who has put the question may,
after the answer has been given, ask one supplementary question directly
related to the subject matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the
consent of the Chair. If a Member does not have the opportunity to put a
supplementary question because no time remains, then he or she can submit it
in writing to the Proper Officer who will arrange for a written answer to be
provided within 7 working days. 
*** Question Time - At each ordinary meeting of the Committee ten minutes will be
allowed for Members questions when any Member of the Committee can put a
question to the Chair on any business within the remit of that Section of the
Committee.  The Member who has put the question may, after the answer has
been given, ask one supplementary question directly related to the subject
matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than ten minutes
after the Committee has started on the relevant item of business, except with
the consent of the Chair.  If a Member does not have the opportunity to put a
supplementary question because no time remains, then he/she can submit it in
writing to the proper officer who will arrange for a written answer to be provided
within seven working days. 
Page 4

Page 5

MORAY COUNCIL 
Economic Development and Infrastructure Services
Committee 
SEDERUNT 
Councillor Marc Macrae  (Chair)
Councillor Amber Dunbar  (Depute Chair)  
Councillor Peter Bloomfield  (Member)
Councillor John Cowe  (Member)
Councillor John Divers  (Member)
Councillor David Gordon  (Member)
Councillor Juli Harris  (Member)
Councillor Sandy Keith  (Member)
Councillor Graham Leadbitter  (Member)
Councillor Paul McBain  (Member)
Councillor Shona Morrison  (Member)
Councillor John Stuart  (Member)
Councillor Draeyk Van Der Horn  (Member)
Councillor Sonya Warren  (Member)  
Clerk Name: Lissa Rowan
Clerk Telephone: 07765 741754
Clerk Email: committee.services@moray.gov.uk 
Page 5

Page 6

Page 6

Page 7

MORAY COUNCIL 
Minute of Meeting of the Economic Development and Infrastructure Services
Committee 
Tuesday, 14 November 2023 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor Peter Bloomfield, Councillor John Cowe, Councillor John Divers,
Councillor David Gordon, Councillor Juli Harris, Councillor Sandy Keith, Councillor
Graham Leadbitter, Councillor Marc Macrae, Councillor Paul McBain, Councillor
Shona Morrison, Councillor John Stuart, Councillor Draeyk Van Der Horn, Councillor
Sonya Warren 
APOLOGIES 
Councillor Amber Dunbar 
IN ATTENDANCE 
The Depute Chief Executive (Economy, Environment and Finance), Head of
Economic Growth and Development, Head of Environmental and Commercial
Services, Head of Housing and Property Services, Transportation
Manager, Strategic Planning and Development Manager, Asset Manager
(Commercial Buildings),  Mrs Anderson, Senior Engineer (Transportation), Ms
Penny, Engineer (Traffic), Sustainable Travel Officer, Ms Ward, Climate Change
Strategy Officer, Mr Gunn, Climate Change Officer, Energy Officer, Legal Services
Manager and Lissa Rowan, Committee Services Officer as Clerk to the Meeting.   
1         Chair 
Councillor Macrae, being Chair of the Economic Development and Infrastructure
Services Committee, chaired the meeting. 
2         Declaration of Group Decisions and Members Interests 
In terms of Standing Orders 21 and 23 and the Councillors’ Code of Conduct, there
were no declarations from Group Leaders or Spokespersons in regard to any prior
decisions taken on how Members will vote on any item on the agenda or any
declarations of Member’s interests in respect of any item on the agenda. 
3         Minute of meeting dated 5 September 2023 
Under reference to paragraph 8 of the Minute of the Economic Development and
Infrastructure Services Committee dated 5 September 2023, Councillor Divers
stated that, although the report was on the Egin Parking Review, he had made
significant comment in relation to car parking charges and asked that a summary
of this be included in the Minute due to the particular interest in this topic.
Item 3
Page 7

Page 8

In response, the Chair advised that the Clerk would review the webcast and
amend the minute accordingly in consultation with Councillor Divers and the Chair.  
Thereafter, the minute of the meeting of the Economic Development and
Infrastructure Services Committee dated 5 September 2023 was submitted and
approved subject to an amendment to paragraph 8 regarding car parking charges.   
4         Written Questions 
The Committee noted the following Written Questions submitted by Councillor Van
Der Horn and subsequent response from the Council.  
Question to Committee on use of Glyphosate  
Relating to 7 February 2023 committee: “(iv) that a further report be brought to a
future meeting of this Committee detailing how Glyphosate will be phased out by
2025.”  
Could this committee have an update on the levels (quantities) of Glyphosate used
by this council and how much we have reduced its used since the ED&I committee
in February. 
Can we be given an update as to what extent officers have monitored and
identified alternatives?  Finally, when may we expect this report?  
RESPONSE  
Since the Committee meeting in February 2023 a total of 956.5 litres of
glyphosate-based products has been applied.  This is a reduction in the region of
49% compared to the previous year (1950 litres used in 2022).  It should be noted
that this reduction is not solely down to changes in working practices as agreed at
Committee.  Other factors also influenced the application of glyphosate including
the weather, staffing levels and reduced requests for spraying from other Council
departments and external third parties.  
Just also to note that the reductions now achieved this year are in addition to the
measures already taken but not recorded as referenced in the previous Economic
Development and Infrastructure committee (ED&I) report and before baselining
data ie.: 3.10 The Council’s Open Space Operations team recognise that
herbicides containing glyphosate continue to provide the most cost effective and
efficient method of weed control across the Council’s estate. Measures have
however been taken to reduce the use of glyphosate where possible. This includes
reducing treatments around amenity grass plots where grass cutting machinery
can easily access to control vegetation, and mulching of some shrub beds and
other amenity plantings to supress weeds. In addition, the team has introduced
areas of less frequent grass cutting to allow wildflowers to thrive to support
biodiversity and to reduce the need for herbicides in these areas  
High level information regarding alternative options to the use of glyphosate were
provided in the report to the ED&I committee on 7 February 2023.  A follow on
report will be presented to the ED&I committee in February 2024. The report will
outline the works and resources needed to plan for phasing out the use of
glyphosate.  If the report is approved by the ED&I committee, a further report
Page 8

Page 9

would need to be presented to the Corporate Committee for any funding
implications to be approved.  
Councillor Van Der Horn thanked Officers for their response however raised
concern in relation to reported links of glyphosate exposure and other pesticide
sprays to cancer and asked if there had been any such reports to the Council.  
In response, the Head of Environmental and Commercial Services advised that
she did not have that information to hand and would provide this to the Committee
after the meeting.   
5         Active Travel Strategy and Action Plan Annual Update 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking the Committee to note the progress made over
the past year on the delivery of the Active Travel Strategy (ATS), which sets out
the Council's vision and action plan over the next 5 years for Active Travel in
Moray.  The report also sought approval for the use of a new Prioritisation Tool
which has been developed to inform the decision making process for new Active
Travel infrastructure schemes.  
The Committee joined the Chair in welcoming Kelly Wiltshire, Transportation
Manager, to her first meeting of the Committee since her new appointment.  
Following consideration, the Committee unanimously agreed to:  
1. note the update in Appendix 1 of the report and progress made in delivering
the ATS Action Plan within the first year of the strategy; and 
2. approve the use of the Prioritisation Tool, to inform the prioritisation of new
Active Travel infrastructure schemes.    
6         Road Safety Plan to 2030 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking the Committee to approve the draft Moray Road
Safety Plan to 2030 subject to further stakeholder consultation.  The report also
informed the Committee of the outcome of investigation of reported injury
accidents on the A98 Fochabers to Aberdeenshire boundary road.  
With the permission of the Chair, Councillor Warren read a statement from the
Buckie and District Community Council in relation to concerns regarding the
current speed limit at Arradoul and agreed to forward this on to council officers.  
In response, Mrs Anderson, Senior Engineer (Transportation) advised that road
safety at Arradoul was under review pending further information from Police
Scotland and offered a session with members of the Community Council in the
New Year to provide an update in relation to road safety in this area.  
Thereafter, the Committee unanimously agreed to: 
Page 9

Page 10

1. approve the draft Road Safety Plan to 2030 attached as Appendix 1 to the
report for consultation with stakeholders; 
2. note the outcome of the investigation of reported injury accidents on the A98
over the ten year period 2013 to 2022; and 
3. note that a session would be offered to Members of the Community Council in
relation to road safety in Arradoul.    
7         Port Marine Safety Code Quarterly Report 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing the Committee on matters of Marine Safety
and compliance with the Port Marine Safety Code (PMSC) for the period Q1 and
Q2 year 2023/24.  
Following consideration, the Committee unanimously agreed to note the safety
performance, fulfilling its function as Duty Holder under the Port Marine Safety
Code.   
8         Biodiversity Duty Report 2021-2023 
Councillor Cowe left the meeting at this juncture.  
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking the Committee to agree the content of the
Council's Biodiversity Duty Report 2021-2023.  
During discussion, it was noted that one of the purposes of biodiversity reporting is
to encourage staff, partners and customers to engage with, understand and
consider biodiversity and it was noted that training is to be provided to officers and
it was queried whether this training could be provided to Elected Members also.  
In response, the Strategic Planning and Development Manager advised that new
biodiversity guidance was emerging and that a training programme for officers
would be provided in the New Year which could be extended to Elected Members.  
Following consideration, the Committee unanimously agreed:  
1. the content of the Biodiversity Duty Report 2021-23 set out in Appendix 1 of
the report that will be issued to the Scottish Government; and 
2. that a training programme for officers on biodiversity would be extended to
Elected Members.   
9         Consultation on Scotland’s Strategic Framework for Biodiversity 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking the Committee to agree the response to the
Scottish Government's Consultation on Scotland's Strategic Framework for
Biodiversity.  
Page 10

Page 11

During discussion, Councillor Van Der Horn queried whether the 6 large
landscapes mentioned at section 2 of the response should be 9 landscape and
seaside coves.  
In response, the Climate Change Strategy Officer advised that this has been an
oversight and agreed to amend this section accordingly.  
Councillor Van Der Horn further noted the gaps in consultation response due to
limited staff time and priorities however stated that these areas have significant
impact on the Council particularly regarding loss of some species and national
parks and asked that further work be completed prior to the response being
submitted.  
In response, the Strategic Planning and Development Manager suggested that
officers liaise with Councillor Van Der Horn in relation to the gaps in the
consultation and that he be given delegated authority to submit the response
thereafter.  This was agreed subject to the response being circulated to the
Committee prior to submission.  
Thereafter, the Committee unanimously agreed the response to the Consultation
on Scotland’s Strategic Framework for Biodiversity that will be submitted to the
Scottish Government subject to: 
• changing "6 large landscapes" mentioned at section 2 of the response to "9
landscape and seaside coves"; and 
• officers liaising with Councillor Van Der Horn in relation to completing the gaps
in the consultation and that the Strategic Planning and Development Manager
be given delegated authority to submit the response thereafter with the
response being circulated to the Committee prior to submission. 
10         Public Sector Climate Change Reporting 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing the Committee of the Council’s Public Sector
Report on Compliance with Climate Change Duties 2022/23 and updates to the
reporting methodology and statutory duties.  
Following consideration, the Committee unanimously agreed to note: 
1. the Council’s Public Sector Report on Compliance with Climate Change Duties
2022/23; and 
2. updates made to the reporting methodology for 2022/23 and statutory duties.    
11         Industrial Portfolio Annual Report 2022-23 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) which set out the annual performance of the Council's
Industrial Portfolio in 2022/23 and asked the Committee to approve in principle, a
related sale of a property.  
Page 11

Page 12

Following consideration, the Committee welcomed the good performance of the
Council’s Industrial Portfolio and thereafter unanimously agreed:  
1. to note the Annual Report for 2022/23; and 
2. in principle, to the sale of the property in Lossiemouth as detailed in paragraph
6.3 of the report.    
12         Suspension of Standing Orders 
The Chair sought the agreement of the Committee to suspend Standing
Order 77 to allow the meeting to progress beyond 12.45 pm.  This was
unanimously agreed. 
13         Annual Report on Energy Strategy and Actions 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) setting out the annual energy and water performance of
the Council’s non-domestic building portfolio in 2022/23.  
Following consideration, the Committee unanimously agreed to: 
1. note the Annual Energy Report for 2022/23 set out in the report; 
2. note that in 2022/23 the Council’s energy consumption in non-domestic
operational properties decreased by 7%, and the energy bill increased by
41.4% (£1,368,365); 
3. approve the update of Energy Policy at Appendix I of the report, to align with
the mandatory targets set by the Scottish Government and agrees that officers
review the Energy Policy and Strategy annually in order to align its goals with
the Route Map to Net Zero; and 
4. note the making of a SALIX grant application as set out in Paragraph 7.6 of the
report.  
Councillor Cowe re-joined the meeting at this juncture.     
14         Performance Report (Environmental and Commercial Services) -
Period to September 2023 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing the Committee of the performance of the
service for the period to 30 September 2023.  
The Committee joined the Chair in commending the m.connect service for
being shortlisted for the Scottish Council for Development and Industry (SCDI)
Highlands & Islands annual awards and being runner up in the category
‘Excellence in Innovation’ and thereafter unanimously agreed to note: 
Page 12

Page 13

1. performance in the areas of Service Planning, Service Performance and other
related data to the end of September 2023; 
2. the actions being taken to improve performance where required.    
15         Performance Report (Economic Growth and Development Services) -
Period to September 2023 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing the Committee of the performance of the
service for the period to 30 September 2023.  
The Committee joined the Chair in commending the work of the Lossie 2-3 Group
and the services they provide which are of good use to the community and
thereafter unanimously agreed to note: 
1. performance in the areas of Service Planning, Service Performance and other
related data to the end of September 2023; 
2. the actions being taken to improve performance where required.    
16         Question Time 
CCTV and 20 MPH Limit Zones Update  
Under reference to the Minute of the meeting of the Economic Development and
Infrastructure Services (ED&IS) Committee dated 5 September 2023, Councillor
Warren stated that she would speak to Officers directly with regard to her
questions on car parking and the weighbridge however sought an update on
queries raised previously in relation to CCTV and 20 mph speed zones.  
In response, the Chair advised that the response from Police Scotland on CCTV
had been uploaded to CMIS and that he was still awaiting a response from the
Scottish Government on 20 mph speed zones however Councillor Dunbar, Depute
Chair of the ED&IS Committee is meeting with the Minister for Transportation in
the near future where this could be discussed.   
Page 13

Page 14

Page 14

Page 15

__________________________________________________
NOTICE OF MOTION
TO ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES
COMMITTEE
6 FEBRUARY 2024 
Electric Vehicle (EV) charging over public footways from home 
Background 
The benefits of EV charging from home are substantial: 
1. Cost-effective – EV chargers take advantage of low-cost, off-peak energy
tariffs.  This is more cost-effective than charging in public. 
2. More eco-friendly – Evs are already extremely eco-friendly providing a range
of benefits such as: 
• Avoiding carbon emissions that may result from using public charging
points;
• EVs produce zero tailpipe emissions;
• By charging at home, the user can choose renewable energy sources
such as solar or wind power;
• By reducing reliance on fossil fuels, EVs play a vital role in mitigating
air pollution and combating climate change 
3. Convenient and freeing up capacity - Charging at home ensures vehicles are
at an optimum charge, maximising performance. In addition to this, as most
EVs have ranges surpassing the average daily distance travelled by
motorists, charging at home reduces the demand during the day on public
charging points which have seen a massive increase in demand. 
Many residents do not have access to off-road parking or access to sites to charge
their vehicles. Currently many decide for themselves to charge by laying cables over
highways. This is potentially a risk to residents and it is unmanaged and without
guidance. 
Providing a report to the Committee could create an opportunity and mechanism to
deliver a safer and managed way to deliver EV charging from home. 
There is currently a pilot being carried out in Durham County Council
https://www.durham.gov.uk/article/29969/Electric-vehicle-EV-charging-trialled-for-
homes-without-driveways#
Item 5
Page 15

Page 16

Hampshire County Council are successfully running a permissions and consent to
place cable on or over highway. 
https://www.hants.gov.uk/transport/electric-vehicles/ev-charging-guidance 
Moray could be seen to be leading the way in Scotland on EV charging. 
As of March 2023, Section 59 of the Roads (Scotland) Acts in relation to obstructions
in roads states that: 
“….nothing shall be placed or deposited in a road so as to cause an obstruction
except with the roads authorities consent in writing and in accordance with any
reasonable conditions which they think fit to attach to the consent” 
Action 
Committee is asked to agree that a report be brought back to this Committee
within 2 cycles which includes an appraisal of options including establishing a
permission process for EV charging at home over public footways. 
Financial implications 
Officers have advised that the provision of a report is unlikely to have direct costs,
although any proposal to introduce on-street residential/private charging access will
have considerable capital and revenue implications which are not covered by any
existing budget, nor is there any pending grant funding that could cover
implementation of any options. 
The preparation of a report will require diversion of approximately 10 days of officer
time from existing priorities which includes progressing the Pathfinder project for
implementation of the public EV charging strategy. 
Proposed By: Councillor Draeyk van der Horn 
Seconded By: Councillor Shona Morrison 
Date Motion Submitted: 31 October 2023
Page 16

Page 17

REPORT TO: ECONOMIC, DEVELOPMENT AND INFRASTRUCTURE 
SERVICES COMMITTEE ON 6 FEBRUARY 2024 
SUBJECT:  KINGSTON COASTAL EROSION 
BY:   DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT 
AND FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the requirements to undertake Erosion Protection
Works to the west of Kingston. 
1.2 This report is submitted to Committee in terms of Section III (19) of the
Council's Scheme of Administration relating to the Flood Risk Management
(Scotland) Act 2009. 
2. RECOMMENDATION 
2.1 It is recommended that Committee agree to progress coastal protection
works to the west of Kingston. 
3. BACKGROUND 
3.1 Kingston on Spey is located on the west bank of the River Spey as it flows
into the Moray Firth. The village of Kingston sits behind a small tidal lagoon.
To the north of the lagoon is a shingle ridge that reduces the impact of wave
energy before it reaches the landward bank of the lagoon. The ridge then
blends into the natural coastline as it heads west of the village. 
3.2 The community has previously raised concerns about the condition of the
shingle ridge and the potential for erosion on the landward bank, as well as
concern of the ridge collapsing to the west of the village and erosion rates
around the green spaces within the village. 
3.3 At a meeting of this Committee on 8 February 2022, Members agreed to
progress the development of a Coastal Adaptation Plan for the Moray
coastline (Paragraph 8 of the minute refers). Kingston was the first coastal
area investigated as part of the proposed plan, as the coastline in this area is
known to be vulnerable to erosion.  The Coastal Adaptation Plan will include a
Regional Plan and eleven Local Plans.  Over the last year the Regional
Adaptation Plan has been drafted along with five Local Plans, including
Kingston. The remaining six Local Plans are being developed and the Coastal
Item 6
Page 17

Page 18

Adaptation Plan is programmed for completion in March 2024. The completed
Coastal Adaptation Plan will be submitted for Members consideration at the
meeting of this Committee on 30th April 2024. 
3.4 Over the last 18 months the rate of erosion of the natural coastline at Kingston
between the Lein Car Park and the village has been significant at around
2m/year. The erosion has exposed demolition material from the former
precast concrete works, which is now spilling onto the beach causing health
and safety issues due to protruding sharp objects. The debris is now entering
a Site of Special Scientific Interest (SSSI) and Special Area of Conservation
(SAC) and will have a detrimental effect on the status of these designations.
The Regulatory body has the ability to prosecute Moray Council if it can
demonstrate that the debris is damaging the SSSI features. 
3.5 The change in erosion at Kingston has now met one of the triggers within the
draft Coastal Adaption Plan. Below is an extract from the draft Kingston
Coastal Adaptation Plan showing this trigger: - 
3.6 As the erosion is placing one of the Council’s assets, Lein Car Park and
amenity space at risk the proposed work complies with the criteria set out in
the Council’s erosion policy: “The Council may undertake erosion
protection work where its assets are at risk. These assets may typically
be buildings, bridges, roads and flood and coast defence infrastructure”. 
It is proposed that the council brings forward actions for sustainable coastal
protection works at Kingston which is exceptional due to its SSSI status. This
will also reduce the risk to public safety from the exposed debris from the old
concrete works and support maintenance of a council asset.  While there has
been significant erosion in recent months along sections of the Moray
Coastline outside of Kingston, such as Findhorn and Lossiemouth, at the point
of writing the report this erosion has not led to the combination of issues set
out for Kingston  and would not comply with our erosion policy.  As such it is
not proposed to undertake coastal protection works in these areas at this
time.  These areas are included in the Coastal Adaptation Plan, which will be
considered by members in the spring. 
3.7 Managing coastal erosion is a complex process and in this location, the
complexity is due to the high sediment load carried down the River Spey,
combined with the sediment drift along Spey Bay. The environmental
designations in this area mean there will be restrictions on the type of works
that can be undertaken. 
CMU  Maximum
historical
change rate
(m/year)
Present-day distance
of feature to coast
(m) 
Erosion trigger
level 1: 
Coast X m from
feature
Erosion trigger
level 2: 
Coast X m from
feature
2 -2.0 Lien Carpark 10 10 4 
Page 18

Page 19

3.8 The proposed work is to install a new shingle ridge along the edge of the
coastline.  The ridge will be approximately 500mm high with naturally sloping
sides, which will be sympathetic to the SSSI.  The ridge will be installed from
the west side of Lein Car Park to east end of the green space tying back into
the main shingle ridge at the lagoon, as shown in the image below. The
shingle will be sourced from within the SSSI, in line with advice provided by
NatureScot. The works will require consent from Marine Scotland and
NatureScot. A drawing of the proposed works is provided in Appendices A
and B. 
3.9 An allowance of £74,226 is in the Capital Plan for 2024/25, this value is the
allowance which has been made as part of general capital allocation for
coastal adaptation to undertake this type of work. The Scottish Government
Coastal Change Adaptation Fund is available to fund specific coastal
activities, including case studies for coastal protection works.  Moray Council
has bid to use Kingston as a case study, which will help inform best practice
for sustainable ongoing management of shingle beach where erosion is high.
The bid has asked for £75,607.50 including cost associated with providing
feedback and lessons learned to other local authorities  If successful, this
funding will be used to undertake the works at Kingston, and officers are
currently waiting to hear from Scottish Government on the success of our
application
3.10 Moray Council officers will continue to monitor the situation with routine
monthly inspections and after a significant storm event. 
Page 19

Page 20

3.11 If committee is minded to approve the recommendation then a community
engagement/information event will be held in the Kingston/Garmouth area.
The event will allow the community to see what works are planned, review
what information will be going in to the adaption plan, as well as see
information on the monitoring we undertake. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
“Empowering and Connecting Communities”. 
(b) Policy and Legal
There are no policy or legal implication associated with the
recommendations in this report. The works comply with the Council
Erosions Policy which was agreed at a meeting Policy and Resources
Committee on 20 January 2015 (Paragraph 6 of the minute refers). The
Regulatory body has the ability to prosecute Moray Council if it can
demonstrate that the debris is damaging the SSSI features. 
(c) Financial implications
If the bid for funding from the Scottish Government Coastal Change
Adaptation Fund is not successful, the works will need to be funded from
the allowance included in the Council’s capital programme . 
(d) Risk Implications
If the works are not undertaken there is a risk of rapid erosion along the
identified area with the possible loss of the Lein Car Park. The Council
could be in breach of both Environmental and Health and Safety
legislation if this work is not undertaken. The Regulatory body has the
ability to prosecute Moray Council if it can demonstrate that the debris is
damaging the SSSI features. There is a risk that if an individual were to
injury themselves, on the exposed material on the beach Moray Council
may be liable for a claim. 
Within the wider moray coastline there will be potential risk to assets
along the Moray coastline. Once complete the adaption plans will
highlight those areas where there is risk and the trigger points at which
an action may need to be taken. 
(e) Staffing Implications
Development of the project will be undertaken within existing flood team
resources. 
(f) Property
If works are not undertaken, there may be a partial or complete loss of
Lein Car Park, which is operated by Moray Council. There will also be
continued loss of amenity and play space, which is owned by the
Council.  
Page 20

Page 21

(g) Equalities/Socio Economic Impact
There are no equalities / socio economic implications associated with the
recommendations in this report. 
(h) Climate Change and Biodiversity Impacts
The works identified are being undertaken due to climate change. The
proposed solution is a sustainable solution using materials from within
the area of the works and do not introduce non-native material and use
natural process rather than hard defences. 
(i) Consultations
Depute Chief Executive (Economy Environment and Finance), Head of
Environmental and Commercial Services, Head of Economic Growth and
Development, Chief Financial Officer, Legal Services Manager,
Equalities Officer and Committee Services Officer have been consulted
and their comments incorporated into the report. 
5. CONCLUSION 
5.1 A significant change has occurred at the west of Kingston, where
erosion of the land round Lein Car Park has met the 1st trigger of the
Kingston Adaption Plan. 
5.2 Erosion has also exposed debris from the old concrete works, which is
creating a hazard to public safety and impacting on environmental
designations and Council assets. 
5.3 Works are required in the interest of public safety and to protect Council
assets in an environmental designated area. 
Author of Report: Will Burnish, Senior Engineer
Background Papers: 
Committee Paper  Minute Date 
ECONOMIC DEVELOPMENT AND
INFRASTRUCTURE SERVICES
COMMITTEE
ADAPTION PLAN FOR COASTAL
EROSION - KINGSTON
Minute 8 08/02/2022
POLICY AND RESOURCES
COMMITTEE
COUNCIL POLICY IN RELATION TO
EROSION
Minute 6 20/01/2015
ECONOMIC DEVELOPMENT AND
INFRASTRUCTURE SERVICES
COMMITTEE
COUNCIL POLICY IN RELATION TO
EROSION
Minute 9 25/11/2014
ECONOMIC DEVELOPMENT AND
INFRASTRUCTURE SERVICES
COMMITTEE
BANK PROTECTION AT KINGSTON
UPON SPEY
Minute 9 30/09/2014
ECONOMIC DEVELOPMENT AND
INFRASTRUCTURE SERVICES
COMMITTEE
BANK PROTECTION AT KINGSTON
UPON SPEY
Minute 6 11/03/2014
ECONOMIC DEVELOPMENT AND
INFRASTRUCTURE SERVICES
COMMITTEE
BANK PROTECTION AT KINGSTON
UPON SPEY
Minute 12 25/06/2013
Page 21

Page 22

ECONOMIC DEVELOPMENT AND
INFRASTRUCTURE SERVICES
COMMITTEE
FLOOD RISK AT KINGSTON AND
GARMOUTH
Minute 9 18/12/2012
ECONOMIC DEVELOPMENT AND
INFRASTRUCTURE SERVICES
COMMITTEE
ECONOMIC DEVELOPMENT AND
INFRASTRUCTURE
SERVICES COMMITTEE
Minute 9 23/10/2012
Ref: SPMAN-524642768-1019
Page 22

Page 23

Rev. Amendment Details By Ch'd App Date
Issued for:
Drawn: Checked: Approved:
Scale: Date:
RevisionDrawing Number:
© MORAY COUNCIL. ALL RIGHTS RESERVED
NOTES
Reproduced by permission of Ordinance Survey on
behalf of HMSO © Crown copyright and database
right 2012.  All rights reserved.
Ordinance Survey Licence number 100023422
JAR
Consultation
OS Grid Ref:     333536 / 865729
@ A1
MORAY COUNCIL
CONSULTANCY
PO BOX 6760
ELGIN IV30 9BX
TEL: 01343 543451
Item 6
Page 23

Page 24

Page 24

Page 25

Level
2
3
6
Proposed Levels
Existing Levels
Offsets
Chainage ???
Level
2
3
6
Proposed Levels
Existing Levels
Offsets
Chainage ???
Level
2
3
6
Proposed Levels
Existing Levels
Offsets
Chainage ???
Level
2
3
6
Proposed Levels
Existing Levels
Offsets
Chainage ???
Level
2
3
6
Proposed Levels
Existing Levels
Offsets
Chainage ???
Level
2
3
6
9
Proposed Levels
Existing Levels
Offsets
Chainage ???
Level
2
3
6
Proposed Levels
Existing Levels
Offsets
Chainage ???
Level
-2
0
3
6
Proposed Levels
Existing Levels
Offsets
Chainage ???
-3.692       
5.524       
5.524
-3.320       
5.512       
5.512
-3.195       
5.508       
5.508
-2.702       
5.498       
5.498
-2.232       
5.500       
5.500
-1.922       
5.504       
5.504
-1.600       
5.508       
5.508
-1.490       
5.510       
5.510
-1.357       
5.643       
5.643
-1.000       
5.999       
5.999
-0.866       
6.000       
6.000
-0.500       
6.000       
6.000
-0.134       
6.000       
6.000
0.000       
6.000       
6.000
0.366       
6.000       
6.000
0.500       
6.000       
6.000
0.634       
6.000       
6.000
1.000       
6.000       
6.000
1.397       
5.603       
5.603
1.546       
5.453       
5.453
1.635       
5.486       
5.486
1.737       
5.479       
5.479
2.241       
5.403       
5.403
3.114       
5.380       
5.380
3.119       
5.380       
5.380
3.123       
5.380       
5.380
3.148       
5.379       
5.379
4.267       
5.354       
5.354
4.611       
5.353       
5.353
5.289       
5.365       
5.365
5.715       
5.341       
5.341
6.057       
5.355       
5.355
6.227       
5.355       
5.355
6.994       
5.373       
5.373
7.917       
5.361       
5.361
8.048       
5.358       
5.358
8.184       
5.356       
5.356
8.751       
5.328       
5.328
9.451       
5.309       
5.309
9.692       
5.298       
5.298
10.000       
5.287       
5.287
-6.134       
5.744       
5.744
-6.104       
5.748       
5.748
-5.911       
5.758       
5.758
-5.641       
5.761       
5.761
-5.375       
5.760       
5.760
-4.529       
5.757       
5.757
-4.452       
5.756       
5.756
-3.377       
5.737       
5.737
-3.043       
5.718       
5.718
-2.632       
5.694       
5.694
-2.411       
5.677       
5.677
-1.659       
5.621       
5.621
-1.458       
5.609       
5.609
-1.399       
5.595       
5.595
-1.288       
5.707       
5.707
-0.995       
5.999       
5.999
-0.869       
6.000       
6.000
-0.495       
6.000       
6.000
-0.121       
6.000       
6.000
0.000       
6.000       
6.000
0.005       
6.000       
6.000
0.379       
6.000       
6.000
0.505       
6.000       
6.000
0.631       
6.000       
6.000
1.005       
6.000       
6.000
1.478       
5.527       
5.527
1.641       
5.363       
5.363
1.644       
5.348       
5.348
2.026       
5.353       
5.353
2.070       
5.353       
5.353
2.776       
5.374       
5.374
3.302       
5.364       
5.364
3.723       
5.350       
5.350
4.175       
5.305       
5.305
4.248       
5.300       
5.300
5.235       
5.235       
5.235
5.890       
5.213       
5.213
6.513       
5.192       
5.192
7.327       
5.161       
5.161
7.607       
5.155       
5.155
8.028       
5.145       
5.145
8.576       
5.133       
5.133
9.237       
5.178       
5.178
9.439       
5.193       
5.193
9.519       
5.205       
5.205
10.000       
5.263       
5.263
-9.504       
5.835       
5.835
-9.482       
5.832       
5.832
-9.369       
5.834       
5.834
-9.087       
5.827       
5.827
-8.863       
5.816       
5.816
-8.418       
5.796       
5.796
-7.677       
5.771       
5.771
-7.560       
5.767       
5.767
-6.684       
5.748       
5.748
-6.322       
5.736       
5.736
-5.740       
5.722       
5.722
-5.516       
5.714       
5.714
-5.426       
5.713       
5.713
-5.076       
5.703       
5.703
-4.350       
5.683       
5.683
-4.041       
5.676       
5.676
-3.819       
5.671       
5.671
-3.144       
5.665       
5.665
-2.268       
5.642       
5.642
-2.089       
5.639       
5.639
-1.945       
5.633       
5.633
-1.415       
5.616       
5.616
-1.390       
5.610       
5.610
-1.032       
5.968       
5.968
-1.000       
6.000       
6.000
-0.543       
6.000       
6.000
-0.500       
6.000       
6.000
-0.457       
6.000       
6.000
0.000       
6.000       
6.000
0.043       
6.000       
6.000
0.500       
5.999       
5.999
0.957       
6.000       
6.000
1.000       
6.000       
6.000
1.490       
5.510       
5.510
1.538       
5.461       
5.461
1.561       
5.461       
5.461
1.585       
5.468       
5.468
1.614       
5.469       
5.469
1.814       
5.467       
5.467
2.496       
5.472       
5.472
2.507       
5.472       
5.472
2.556       
5.471       
5.471
3.550       
5.449       
5.449
3.983       
5.419       
5.419
4.760       
5.425       
5.425
4.975       
5.432       
5.432
5.866       
5.122       
5.122
6.221       
4.873       
4.873
6.778       
4.472       
4.472
6.941       
4.343       
4.343
7.027       
4.317       
4.317
7.331       
4.297       
4.297
8.090       
4.210       
4.210
8.351       
4.220       
4.220
8.853       
4.264       
4.264
9.421       
4.315       
4.315
9.999       
4.380       
4.380
10.000       
4.380       
4.380
-10.000       
5.873       
5.873
-9.941       
5.872       
5.872
-9.716       
5.872       
5.872
-9.392       
5.873       
5.873
-8.610       
5.880       
5.880
-7.922       
5.887       
5.887
-7.673       
5.889       
5.889
-6.810       
5.878       
5.878
-6.577       
5.876       
5.876
-5.832       
5.835       
5.835
-5.709       
5.828       
5.828
-5.662       
5.824       
5.824
-4.732       
5.728       
5.728
-4.529       
5.718       
5.718
-4.122       
5.712       
5.712
-3.488       
5.707       
5.707
-3.038       
5.707       
5.707
-2.396       
5.693       
5.693
-2.021       
5.675       
5.675
-1.622       
5.655       
5.655
-1.534       
5.654       
5.654
-1.453       
5.650       
5.650
-1.348       
5.645       
5.645
-1.063       
5.930       
5.930
-0.994       
5.999       
5.999
-0.890       
6.000       
6.000
-0.494       
6.000       
6.000
-0.096       
6.000       
6.000
0.000       
6.000       
6.000
0.006       
6.000       
6.000
0.404       
6.000       
6.000
0.506       
6.000       
6.000
0.610       
6.000       
6.000
1.006       
6.000       
6.000
1.263       
5.743       
5.743
2.637       
4.369       
4.369
2.669       
4.336       
4.336
3.410       
4.055       
4.055
3.608       
3.975       
3.975
3.715       
3.943       
3.943
4.615       
3.656       
3.656
4.721       
3.627       
3.627
4.907       
3.616       
3.616
5.529       
3.519       
3.519
5.726       
3.483       
3.483
7.289       
3.488       
3.488
7.701       
3.543       
3.543
8.210       
3.643       
3.643
8.607       
3.595       
3.595
9.807       
3.542       
3.542
9.900       
3.537       
3.537
10.000       
3.503       
3.503
-10.000       
5.879       
5.879
-9.782       
5.875       
5.875
-9.337       
5.869       
5.869
-9.081       
5.865       
5.865
-8.766       
5.861       
5.861
-8.013       
5.848       
5.848
-7.541       
5.839       
5.839
-7.252       
5.835       
5.835
-6.366       
5.826       
5.826
-6.278       
5.826       
5.826
-5.382       
5.843       
5.843
-4.995       
5.833       
5.833
-4.107       
5.824       
5.824
-4.077       
5.821       
5.821
-3.103       
5.716       
5.716
-2.776       
5.700       
5.700
-1.941       
5.677       
5.677
-1.910       
5.678       
5.678
-1.365       
5.698       
5.698
-1.301       
5.699       
5.699
-1.017       
5.983       
5.983
-1.000       
5.999       
5.999
-0.967       
6.000       
6.000
-0.500       
6.000       
6.000
-0.033       
6.000       
6.000
0.000       
6.000       
6.000
0.467       
6.000       
6.000
0.500       
6.000       
6.000
0.533       
6.000       
6.000
1.000       
6.000       
6.000
1.097       
5.902       
5.902
2.544       
4.455       
4.455
2.604       
4.467       
4.467
2.652       
4.465       
4.465
2.684       
4.464       
4.464
3.132       
4.494       
4.494
3.647       
4.507       
4.507
4.097       
4.524       
4.524
4.497       
4.542       
4.542
4.792       
4.540       
4.540
5.467       
4.441       
4.441
5.848       
4.245       
4.245
6.333       
4.014       
4.014
6.551       
3.924       
3.924
6.796       
3.812       
3.812
7.203       
3.652       
3.652
7.717       
3.467       
3.467
8.215       
3.378       
3.378
8.819       
3.295       
3.295
9.221       
3.321       
3.321
9.427       
3.337       
3.337
-10.000       
6.447       
6.447
-9.751       
6.451       
6.451
-9.096       
6.491       
6.491
-8.728       
6.510       
6.510
-8.362       
6.528       
6.528
-7.913       
6.519       
6.519
-7.498       
6.534       
6.534
-7.286       
6.532       
6.532
-6.558       
6.489       
6.489
-6.209       
6.479       
6.479
-5.880       
6.473       
6.473
-5.262       
6.462       
6.462
-4.658       
6.431       
6.431
-4.532       
6.428       
6.428
-4.367       
6.425       
6.425
-3.354       
6.407       
6.407
-2.332       
6.366       
6.366
-2.296       
6.363       
6.363
-2.275       
6.360       
6.360
-2.246       
6.359       
6.359
-1.262       
6.280       
6.280
-1.098       
6.116       
6.116
-0.982       
6.000       
6.000
-0.724       
6.000       
6.000
-0.483       
6.000       
6.000
-0.226       
6.000       
6.000
0.000       
6.000       
6.000
0.016       
6.000       
6.000
0.273       
6.000       
6.000
0.515       
6.000       
6.000
0.775       
6.000       
6.000
1.014       
6.000       
6.000
1.921       
5.090       
5.090
2.635       
4.375       
4.375
2.903       
4.355       
4.355
3.444       
4.318       
4.318
4.070       
4.294       
4.294
4.176       
4.294       
4.294
5.400       
3.981       
3.981
5.797       
3.795       
3.795
6.629       
3.549       
3.549
7.398       
3.356       
3.356
7.642       
3.301       
3.301
7.816       
3.268       
3.268
8.249       
3.166       
3.166
8.664       
3.072       
3.072
8.771       
3.063       
3.063
9.130       
3.045       
3.045
9.253       
3.059       
3.059
-10.000       
5.059       
5.059
-9.171       
5.202       
5.202
-8.883       
5.193       
5.193
-7.996       
5.216       
5.216
-7.988       
5.217       
5.217
-7.979       
5.217       
5.217
-6.961       
5.177       
5.177
-6.566       
5.218       
5.218
-6.202       
5.328       
5.328
-5.838       
5.398       
5.398
-4.900       
5.482       
5.482
-4.852       
5.490       
5.490
-3.909       
5.563       
5.563
-3.858       
5.567       
5.567
-3.856       
5.567       
5.567
-3.853       
5.567       
5.567
-3.006       
5.663       
5.663
-2.455       
5.704       
5.704
-1.889       
5.760       
5.760
-1.214       
5.818       
5.818
-1.179       
5.820       
5.820
-1.002       
5.997       
5.997
-1.000       
5.999       
5.999
-0.991       
6.000       
6.000
-0.500       
6.000       
6.000
-0.009       
6.000       
6.000
0.000       
6.000       
6.000
0.009       
6.000       
6.000
0.500       
5.999       
5.999
0.991       
6.000       
6.000
1.000       
6.000       
6.000
1.029       
5.971       
5.971
2.578       
4.422       
4.422
2.590       
4.421       
4.421
3.281       
4.320       
4.320
3.484       
4.261       
4.261
4.159       
3.963       
3.963
4.313       
3.894       
3.894
4.975       
3.604       
3.604
5.273       
3.493       
3.493
5.864       
3.325       
3.325
6.392       
3.239       
3.239
6.802       
3.224       
3.224
7.389       
3.251       
3.251
7.951       
3.319       
3.319
8.368       
3.382       
3.382
9.156       
3.483       
3.483
9.467       
3.526       
3.526
10.000       
3.450       
3.450
-10.000       
4.886       
4.886
-9.649       
4.876       
4.876
-8.966       
4.990       
4.990
-8.854       
4.999       
4.999
-8.748       
5.012       
5.012
-7.588       
5.169       
5.169
-7.490       
5.187       
5.187
-7.313       
5.226       
5.226
-6.329       
5.430       
5.430
-5.658       
5.524       
5.524
-5.265       
5.574       
5.574
-4.985       
5.617       
5.617
-3.942       
5.746       
5.746
-3.710       
5.775       
5.775
-3.120       
5.832       
5.832
-2.591       
5.850       
5.850
-2.291       
5.855       
5.855
-1.695       
5.871       
5.871
-1.577       
5.877       
5.877
-1.558       
5.878       
5.878
-1.081       
5.919       
5.919
-1.022       
5.978       
5.978
-1.000       
5.999       
5.999
-0.754       
6.000       
6.000
-0.500       
6.000       
6.000
-0.246       
6.000       
6.000
0.000       
6.000       
6.000
0.254       
6.000       
6.000
0.500       
5.999       
5.999
0.746       
6.000       
6.000
1.000       
6.000       
6.000
1.797       
5.202       
5.202
2.645       
4.355       
4.355
2.661       
4.213       
4.213
2.935       
4.095       
4.095
3.286       
3.961       
3.961
3.702       
3.804       
3.804
3.920       
3.736       
3.736
4.251       
3.658       
3.658
4.932       
3.519       
3.519
5.327       
3.463       
3.463
6.023       
3.400       
3.400
6.200       
3.387       
3.387
6.290       
3.379       
3.379
6.856       
3.374       
3.374
7.406       
3.387       
3.387
7.436       
3.389       
3.389
8.397       
3.330       
3.330
8.919       
3.211       
3.211
9.339       
3.041       
3.041
10.000       
2.824       
2.824
Ch 775.0m Ch 800.0m Ch 825.0m
Ch 850.0m Ch 875.0m Ch 900.0m
Ch 925.0m Ch 950.0m
Total Volume Table
Chainage
2.246
27.586
52.837
81.068
106.786
132.370
158.673
183.850
Cut Area
0.003m2
0.003m2
0.003m2
0.002m2
0.001m2
0.099m2
0.000m2
0.000m2
Fill Area
1.199m2
1.300m2
1.276m2
2.025m2
2.038m2
1.369m2
2.019m2
1.984m2
Cut Vol
0.000m3
0.085m3
0.084m3
0.071m3
0.029m3
1.292m3
1.270m3
0.003m3
Fill Vol
0.000m3
31.714m3
32.516m3
46.879m3
51.726m3
42.848m3
45.788m3
49.518m3
Cum Cut Vol
0.000m3
0.085m3
0.169m3
0.240m3
0.269m3
1.561m3
2.831m3
2.835m3
Cum Fill Vol
0.000m3
31.714m3
64.230m3
111.109m3
162.834m3
205.682m3
251.470m3
300.989m3
Net Vol
0.000m3
-31.629m3
-64.061m3
-110.868m3
-162.565m3
-204.122m3
-248.639m3
-298.154m3
Ch
775.0mCh
800.0mCh
825.0mCh
850.0mCh
875.0mCh
900.0mCh
925.0mCh
950.0m
(183.85m)
(158.673m)
(132.37m)
(106.786m)
(81.068m)
(52.837m)
(27.586m)
(2.246m)
Cut/Fill Summary
Name
vol_surf-embank-v1
Totals
Cut Factor
1.000
Fill Factor
1.000
2D Area
243454.055sq.m
243454.055sq.m
Cut
2.595 Cu. M.
2.595 Cu. M.
Fill
348.295 Cu. M.
348.295 Cu. M.
Net
345.700 Cu. M.<Fill>
345.700 Cu. M.<Fill>
Rev. Amendment Details By Ch'd App Date
Issued for:
Drawn: Checked: Approved:
Scale: Date:
RevisionDrawing Number:
© MORAY COUNCIL. ALL RIGHTS RESERVED
NOTES
Reproduced by permission of Ordinance Survey on
behalf of HMSO © Crown copyright and database
right 2012.  All rights reserved.
Ordinance Survey Licence number 100023422
JAR
Consultation
OS Grid Ref:     333536 / 865729
@ A1
MORAY COUNCIL
CONSULTANCY
PO BOX 6760
ELGIN IV30 9BX
TEL: 01343 543451
Item 6
Page 25

Page 26

Page 26

Page 27

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 6 FEBRUARY 2024 
SUBJECT: MORAY HYDROGEN STRATEGY UPDATE 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To seek the agreement of the Committee to adopt the Moray Hydrogen
Strategy Phase 2 Update. 
1.2 This report is submitted to Committee in terms of Section III (F) (33) of the
Council's Scheme of Administration relating to providing, developing and
monitoring the Council’s Economic Development and Infrastructure Services. 
2. RECOMMENDATION 
2.1 It is recommended that Committee approves and adopts the:- 
(i) Scoping Report for delivery of Phase 2 of the Moray Hydrogen
Strategy (Appendix 1);
(ii) delivery plan for the Moray Hydrogen Strategy (Appendix 2) 
3. BACKGROUND 
3.1 Development of a hydrogen economy is a national priority. In December 2020,
the Scottish Government published a Hydrogen Policy Statement which aims
for Scotland to be a “leading hydrogen nation in the production of reliable,
competitive, sustainable hydrogen”. Moray has access to significant sources
of green renewable power including offshore and onshore wind farms which,
subject to contract, could create the conditions required to produce green
hydrogen within Moray at scale.
Item 7
Page 27

Page 28

3.2 On 10 March 2021, the Council adopted a Climate Change Strategy (CCS) for
2020-2030. In response to the actions approved as part of the CCS,
consultants were commissioned to develop a Moray Hydrogen Strategy (para
13 of the Minute refers). Highlands and Islands Enterprise (HIE) were a key
stakeholder in the development of the Moray Hydrogen Strategy and sought
that the strategy include information on the decarbonisation of Moray’s
distilling industry and other key projects including the infrastructure required to
produce, store and supply hydrogen. On 6 September 2022 this Committee
approved the first Moray Hydrogen Strategy (Para 10 of the Minute refers) 
3.3 Hydrogen is fast becoming a key energy resource in the transition to a low
carbon future. When produced from renewable energy sources, hydrogen is a
zero carbon, zero emissions fuel that can be used for heavy duty vehicles,
industrial uses and to heat homes. 
3.4 A hydrogen economy is an economy that relies on hydrogen as the
commercial fuel to deliver a substantial fraction of an area’s energy and
service needs. Developing a hydrogen economy in Moray during the short to
medium term, including connecting into adjacent areas, could:
• contribute towards a reduction in greenhouse gas and particulate
emissions;
• improve the security of Moray’s energy supply;
• increase and make better use of local renewable energy generation;
and
• help to address fuel poverty issues, particularly in rural areas. 
3.5 To deliver a hydrogen economy the following key steps were proposed in the
Moray Hydrogen Strategy: 
• In the short term (2023-2030): Create a hydrogen steering group within
Moray to drive the development of hydrogen opportunities, stimulating
both supply and demand. This group is led by Moray Council and
include key stakeholders from the industrial base and wider community.
The steering group meets monthly, and a number of successful
stakeholder events have been held to date including a transport
focused event. 
• Develop a pilot project to generate demand for hydrogen locally. A
small-scale pilot project or projects are proposed to include combined
hydrogen generators, storage and refuelling at a single site. The
potential locations (as identified in Phase 1) to be considered are
Lossiemouth, Aberlour, Buckie Harbour, Keith and Elgin. The target
users for the hydrogen in the first instance would be the “back to base”
and transport fleets such as local buses and refuse trucks. 
• In the short to medium term, the aim would be to expand the hydrogen
generation facilities to further stimulate the demand from road freight
transport and from the industrial users such as the distilleries. 
• In the long term (beyond 2040), the hydrogen economy for Moray could
be based on generating hydrogen from green electricity sources within
Page 28

Page 29

Moray, purchasing hydrogen from outside the area, and distributing
hydrogen through the area through a pipeline network. The demand for
hydrogen would come from a wider range of sectors including the
distilleries, other high-heat industry, the road haulage industry, council
services and potentially to heat homes and businesses. 
4. PROPOSED PHASE 2 TO DELIVER MORAY HYDROGEN STRATEGY 
4.1 To progress the Moray Hydrogen Strategy a grant from The Just Transition
Fund was received. This allowed Mott Macdonald to be contracted to engage
with businesses and develop a scoping report for the delivery of Phase 2 of
the Hydrogen Strategy (Appendix 1). This research recommended to
separate the pilot into two aspects – an initial small pilot for Council fleet
vehicles using hydrogen from outwith Moray, and the later development of
public refuelling facilities as the hydrogen economy matures. These are
included as actions 1.6 and 1.7 in the Delivery Plan (Appendix 2). 
4.2 The aim of the Fuel Switching study was to highlight decarbonisation
opportunities for Moray Council’s fleet. The fuel switching study will be
presented to Committee with the wider Fleet Decarbonisation Strategy It
recommends that the Council should look to pilot a small number of hydrogen
vehicles as part of our fleet of vehicles. An initial pilot should include refuelling
facilities for Council vehicles at the depot using a hydrogen fuel supply from
outwith Moray. This will be the quickest way to proceed and can help to build
public awareness, knowledge and stakeholder acceptance of hydrogen
vehicles. By piloting a small number of vehicles with hydrogen produced
elsewhere this will provide an immediate demand for hydrogen. The number
of hydrogen vehicles can then be upscaled once a public hydrogen fuelling
facility is available. This will probably be after 2027 at the earliest and is.
discussed in section 4.3 – 4.12. 
4.3 The proposed scope of delivery of phase 2 of the Hydrogen Strategy is
presented in Appendix 1. In summary, this r seeks to determine where
suitable public hydrogen fuelling facilities can be located. It demonstrates that
there are locations that would be suitable for refuelling sites in Elgin, that
Buckie harbour is suitable for a maritime refuelling centre, and more work is
required to determine a suitable location in Speyside for a joint hydrogen
production and refuelling site. 
4.4 This scope of future work expands on the previous phase of the project by: 
• Supporting further progress of the hydrogen stakeholder network,
• examination of hydrogen delivery infrastructure and actions required to
develop a hydrogen economy,
• developing an in-depth social outcome analysis to help maximise the
benefits of hydrogen investment. 
Page 29

Page 30

4.5 Developing a hydrogen economy to meet the Scottish Government’s Net Zero
target of 2045 will require the parallel growth of supply and demand. The
hydrogen strategy for Moray sets out how the supply for hydrogen can be
increased over time to meet the increasing local demand for hydrogen from
industrial users, transport, hospitals, and public sector organisations as well
as local communities. 
4.6 Following on from the Phase 1 report which identified potential hydrogen hub
locations, a key action for Phase 2 was to pinpoint where the highest
hydrogen demand is likely to be from, and thus support the future possible
deployment of Moray’s first stand-alone Hydrogen Refuelling Station (HRS) or
as part of a hydrogen ‘’hub’’ which seeks to produce hydrogen on site as well
as have public refuelling facilities. 
4.7 In the context of the Phase 2, the initial ‘high level’ considerations of the site
selection were further investigated based on an overarching set of criteria,
such as hydrogen demand, stakeholder proximity and engagement, and social
outcomes. This exercise scored criteria against the broad range of disciplines,
for a comprehensive assessment of specific sites. 
4.8 In terms of future hydrogen demand, the locations closer to higher traffic flows
and high density of whisky distilleries, such as Elgin or Aberlour have scored
higher than the rest of the evaluated possible sites. There is a strong desire to
implement a hydrogen economy within Aberlour, since some transport
logistics companies, which count distilleries as clients, are investing in
hydrogen fuelled vehicles. Therefore, Elgin and Aberlour are two key strategic
sites for a future hydrogen hub based on foreseeable future demand. 
4.9 Notwithstanding these factors, the social outcome assessment has revealed
that the high need for socio-economic intervention in places such as Buckie,
Aberlour and Keith could be addressed by deploying pilot hydrogen, end-use
or storage projects within the area. It is noted that the highest levels of
unemployment and deprivation were observed in Buckie and as such the
effects of a corresponding community benefit strategy would be favourable.
Due to Buckie’s strategic location on the Scottish North-East coast, it has high
potential to serve as a HRS for crew transport vessels transferring technicians
to nearby offshore windfarms for maintenance and technical surveillance. 
4.10 Therefore, Elgin and Aberlour should be considered as potential HRS
locations for road haulage end-users and Buckie should be considered as
potential HRS for maritime end-users. Further stages of the project should
consider the feasibility of a dual-purpose HRS for supporting fuel transition of
both transport means. 
4.11 At this stage of site selection process, the current recommendation is for a
hydrogen refuelling facility at Location 1 (Elgin: A96 Barmuckity area), subject
to assessment of whether the required clearances can be achieved
underneath the overhead power line. Although this is the current
recommendation, further investigation into land ownership, stakeholder
engagement and site visits may highlight a more suitable site. 
Page 30

Page 31

4.12 Two potential sites in Aberlour have been found unsuitable based on the
Moray Local Development Plan (MLDP) 2020 but generally scored highly due
to the transport demand, so it is recommended that alternative site options in
line with the MLDP 2020 within Aberlour are explored during the next stage
and compared to the sites above before any final decision is made on site
selection. As the new MLDP is currently being developed it is recommended
that future work also considers how this Hydrogen Strategy could feed into the
development of the new MLDP. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Development of a Moray Hydrogen Strategy was an action of the
Council’s Climate Change Strategy 2020-2030 which supports the
priorities set out in the Corporate Plan 2019-2024. 
(b) Policy and Legal
The Climate Change (Scotland) Act 2009 places a duty on public bodies
to act in a way that they consider most sustainable and in the way best
calculated to deliver the emission reduction targets set in the Act. 
(c) Financial implications
There are no financial implications for the Council at this stage as the
documents set out a strategic pathway to be developed. The pilot will
involve a government funding bid by partners to enable the project to
progress. 
(d) Risk Implications
There is a risk that the Council will be unable to comply with its own net
zero target and subsequent statutory net zero targets if work to develop
sustainable energy systems does not accelerate. If a hydrogen strategy
is not implemented, Moray would fail to maximise the benefits of
developing a hydrogen economy. 
(e) Staffing Implications
There will be a requirement for staff from several services including
Strategic Planning & Development, Housing & Property and
Environmental & Commercial Services to contribute to the progression of
the strategy and a fleet pilot. 
(f) Property
There will be property implications linked to the delivery of the Moray
Hydrogen Strategy including the depot at Ashgrove if it is designated as
a green hub. These implications will be set out in more detail as the key
actions relating to the fleet pilot are developed. 
Page 31

Page 32

(g) Equalities/Socio Economic Impact
There are no equalities/socio economic impacts at this stage. The social
outcome assessment has revealed that the high need for socio-
economic intervention in places such as Buckie, Aberlour and Keith
could be addressed by deploying pilot hydrogen, end-use or storage
projects within the area. This will be considered, and an equalities impact
assessment carried out where funding applications are progressed. 
(h) Climate Change and Biodiversity Impacts
This update of a hydrogen strategy will assist with the Council’s
decarbonisation target to be net zero by 2030, and the transition to net
zero across the wider Moray area, in line with the aims of the Moray
Council Climate Change Strategy 2020-2030. By piloting hydrogen
projects within Moray, it will be possible to influence, educate and
engage the wider community in climate action initiatives. 
(i) Consultations
Consultations have been undertaken with the Depute Chief Executive
(Economy, Environment and Finance), the Head of Economic Growth &
Development, the Legal Services Manager, the Head of Housing and
Property, the Head of Environmental and Commercial Services, the
Head of Education Resources & Communities, the Property Asset
Manager, the Energy Officer, the Equal Opportunities Officer, the Roads
Maintenance Manager, and L Rowan, Committee Services Officer.
Where comments have been received, these have been included within
the report. 
6. CONCLUSION 
6.1 The Moray Hydrogen Strategy Scoping Report for delivery of Phase 2
supports the development of a hydrogen economy in Moray. It will
support the necessary capacity building for an industry shift to
hydrogen, and the production of green hydrogen to reduce reliance on
carbon intensive energy sources. 
6.2 The recommendations support a sustainable approach to achieving
emissions reduction in line with the Council’s own net zero target and
its duties under the Climate Change (Scotland) Act 2009. 
Author of Report: Rod Lovie, Principal Climate Change Strategy Officer
Background Papers: hydrogen strategy
ED&I committee report 6 sept 2022
Ref: SPMAN-813460984-461
Page 32

Page 33

Moray Hydrogen Strategy 
Phase 2 Report 
December 2023
Confidential     
Item 7
Page 33

Page 34

This page left intentionally blank for pagination.  
Page 34

Page 35

Mott MacDonald
Moray House
16-18 Bank Street
Inverness IV1 1QY
United Kingdom 
T +44 (0)1463 239323
mottmac.com 
Mott MacDonald Limited. Registered in
England and Wales no. 1243967.
Registered office: Mott MacDonald House,
8-10 Sydenham Road, Croydon CR0 2EE,
United Kingdom 
Moray Hydrogen Strategy 
Phase 2 Report 
December 2023
Confidential   
Page 35

Page 36

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
Issue and Revision Record
Revision Date Originator Checker Approver Description
A 25/08/2023  JJ, NH, OV,
SN, SS, TB
SN MY Draft Issue for Client Review 
B 11/12/2023 TC SN MY Final Issue                                           
Document reference:   
Information class: Standard 
This document is issued for the party which commissioned it and for specific purposes connected with the above-
captioned project only. It should not be relied upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this document being relied upon by any other party, or being
used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied
to us by other parties.
This document contains confidential information and proprietary intellectual property. It should not be shown to other
parties without consent from us and from the party which commissioned it.
Page 36

Page 37

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
Contents
Executive Summary 1
1 Introduction 4
1.1 Project Background 4
2 Abbreviations 7
3 Hydrogen Demand Analysis 8
3.1 Purpose 8
3.2 Overview 9
3.3 Assessment Methodology 9
3.3.1 Multi-Criteria Assessment 9
3.3.2 Stakeholder Engagement Exercise 11
3.4 Assessment Limitations 12
4 Multi-Criteria Assessment Findings 13
4.1 HGV Flows 13
4.2 LGV Flows 14
4.3 Car/Taxi Flows 16
4.4 PSV Flow 17
4.5 Stakeholder Proximity Analysis 18
4.6 Summary of Analysis 20
5 Stakeholder Engagement Exercise 21
5.1 Existing Fleets 21
5.2 Fleet Movements 22
5.3 Fleet Transition Plans 22
5.4 Barriers to Hydrogen Uptake 22
5.5 Final Thoughts 23
5.6 Implications for Hydrogen Refuelling Station Selection Process 23
6 Social Outcomes 24
6.1 Moray – Local Context 24
6.2 Location Appraisal 24
6.3 Approach 25
6.4 Location Ranking 26
6.4.1 Scoring Matrix 26
6.4.2 Scottish National Baseline Criteria 26
Page 37

Page 38

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
6.5 Location ranking and scoring 27
6.6 Community Benefit Measuring Success 30
7 Road Refuelling Site Selection 33
7.1 Assessment Methodology 33
7.2 Multi-Criteria Assessment 34
7.2.1 The Land 34
7.2.2 Power 34
7.2.3 Water 34
7.2.4 Wastewater 34
7.2.5 Road Access 35
7.2.6 Transport Demand 35
7.2.7 Social Value 35
7.3 Scoring Results 37
7.4 Site Selection Shortlist & Final Site Recommendation 38
7.4.2 Final Site Recommendation 45
8 Road Refuelling 46
8.1 Overview 46
8.1.1 Storage 46
8.1.2 Layout & Footprint 47
9 Maritime Refuelling & Footprint 49
9.1 Buckie Harbour 49
9.2 Infrastructure Requirements 51
9.3 High Pressure Storage 51
9.4 Hydrogen Dispensers 52
9.5 Bunkering 52
9.6 Footprint 53
10 Conclusion 54
10.1 Overview of Findings 54
11 Recommendations 55
11.1 Next Steps 55
11.1.1 Road & Maritime Hydrogen Refuelling 55
A. Stakeholder List 57
B. Site Selection Prospects 58
B.1 Elgin 58
B.2 Lossiemouth 61
Page 38

Page 39

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
B.3 Aberlour 62
B.4 Blackhillock (Keith) 64
B.5 Buckie Harbour 65
C. Elgin Location Profile 68
C.1 Labour Market and Local Area 68
C.2 Skills and Training 69
C.3 Local Economy 69
C.4 Health and Wellbeing 70
D. Lossiemouth Location Profile 71
D.1 Labour Market and Local Area 71
D.2 Skills and Training 72
D.3 Local Economy 72
D.4 Health and Wellbeing 73
E. Aberlour Location Profile 74
E.1 Labour Market and Local Area 74
E.2 Skills and Training 74
E.3 Local Economy 75
E.4 Health and Wellbeing 75
F. Blackhillock (Keith) Location Profile 76
F.1 Labour Market and Local Area 76
F.2 Skills and Training 77
F.3 Local Economy 77
F.4 Health and Wellbeing 77
F.5 Energy Masterplan 77
G. Buckie Harbour Location Profile 78
G.1 Labour Market and Local Area 78
G.2 Skills and Training 79
G.3 Local Economy 80
G.4 Health and Wellbeing 80
H. Community Development Funds 81
I. Latest Hydrogen Research 82
J. Subsidies and Funding 83 
Page 39

Page 40

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
Page 40

Page 41

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
December 2023 
Page 1 of 86
Executive Summary 
Moray Council approved a Climate Change Strategy on 10th March 2021 with a high-level
action plan. Moray has a population circa 97,000 and has high levels of manufacturing including
50% of Scotland’s distilleries and global brands. 
Hydrogen is fast becoming a key energy resource in the transition to a low carbon future. To
achieve Moray Council’s commitment to achieve Net Zero by 2030 and enable the energy
transition, the Council has engaged Mott MacDonald to develop a strategy for hydrogen,
including opportunities for the transition of Council owned buildings and the transport fleet. 
Highlands and Islands Enterprise (HIE) also sought for the strategy to include information on the
decarbonisation of Moray’s distilling industry and other key hydrogen projects; and the
associated infrastructure requirements to produce, store and supply hydrogen. 
Developing a hydrogen economy in Moray during the short to medium term, including
connecting into adjacent regions, could contribute to a reduction in greenhouse gases and
particulate emissions, improve security of energy supply, contribute towards the decarbonisation
of transport, increase and make better use of renewable energy generation, and could help
address fuel poverty issues, particularly in rural areas.
Moray Council and HIE developed a Hydrogen Strategy and Action Plan which explores the use
of green hydrogen to help achieve the benefits of a hydrogen economy. The Council recognises
that hydrogen could have a key role in providing an alternative energy to fossil fuels.
The challenge is to understand the market context within Moray to develop short-, medium- and
long-term hydrogen demand profiles which can then be used to determine the viability of
hydrogen generation and storage. 
The Moray Hydrogen Scoping Report for Phase 2 expands on the previous phase of the project
by offering further support for the establishment of a hydrogen stakeholder network,
examination of hydrogen delivery infrastructure and actions required to develop a hydrogen
economy. Moreover, as the Council has expressed a strong desire to provide ‘’a life of
opportunity for all, where people can thrive in vibrant communities, and where we work together
to enrich our future.”, an in-depth social outcome analysis has also been developed to help
maximise the benefits of hydrogen investment. 
Developing a hydrogen economy to meet the Scottish Government’s and Moray Council’s Net
Zero targets will require the parallel growth of supply and demand. The hydrogen strategy for
Moray sets out how the supply for hydrogen can be increased over time to meet the increasing
local demand for hydrogen from industrial users, transport, hospitals, and public sector
organisations as well as local communities. 
The development of a hydrogen economy within Moray will bring many benefits to the region
including inward investment, creation of new opportunities and jobs, retention and development
of young persons in Moray. Inward investment in the hydrogen supply, demand and
infrastructure within Moray offers a sustainable economic growth opportunity with a positive
impact on reducing poverty. 
Moray has access to significant sources of green renewable power including offshore and
onshore wind farms which, subject to contract, could create the conditions required to produce
green hydrogen within Moray at scale. To deliver a hydrogen economy the following key steps
were proposed in the initial Strategy and further developed within Phase 2:
Page 41

Page 42

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
December 2023 
Page 2 of 86
● Create a hydrogen steering group within Moray to drive the development of hydrogen
opportunities, stimulating both supply and demand. This group could be led by Moray
Council and include key stakeholders from the industrial base and wider community. This
steering group and a wider hydrogen stakeholder network have been set-up as part of Phase
2. The steering group meets monthly, and a number of successful stakeholder events have
been held to date including a transport focused event.
● Start to generate hydrogen within Moray to generate demand. A small-scale pilot project or
projects are proposed to include combined hydrogen generators, storage and refuelling at a
single site. Regional scale-up options will be considered when selecting pilot project(s). The
potential locations (as identified in Phase 1) to be considered are Lossiemouth, Aberlour,
Buckie Harbour, Keith and Elgin. The target users for the hydrogen in the first instance would
be the “back to base” and transport fleets such as local buses and refuse trucks. 
● In the short to medium term, the aim would be to expand the hydrogen generation facilities to
further stimulate the demand from road freight transport and form the industrial users such
as the distilleries. Hydrogen can start to be distributed by road tanker from the generator to
the end user. A network of hydrogen refuelling stations can be developed, further stimulating
demand from the road freight transport users.
● In the long term, the hydrogen economy for Moray could be based on generating hydrogen
from green electricity sources within Moray, purchasing hydrogen from outside the area, and
distributing hydrogen through the area through a pipeline network. The demand for hydrogen
would come from a wider range of sectors including the distilleries, other high-heat industry,
the road haulage industry, council services and potentially to heat homes and businesses. 
Following on from the Phase 1 report that identified potential hydrogen hub locations, a key
action for Phase 2 was to pinpoint where the highest hydrogen demand is coming from, and
thus support the deployment of Moray’s first Hydrogen Refuelling Station (HRS) or as part of a
hydrogen ‘’hub’’. 
In the context of the Phase 2, the initial ‘high level’ considerations of the site selection were
further investigated based on an overarching set of criteria, such as hydrogen demand,
stakeholder proximity and engagement and social outcomes. This exercise scored criteria
against the broad range of disciplines, for a comprehensive assessment of specific sites.
In terms of future hydrogen demand, the locations closer to higher traffic flows and high density
of whisky distilleries, such as Elgin or Aberlour have scored higher than the rest of the evaluated
possible sites. There is a strong desire to implement a hydrogen economy, since some transport
logistics companies, which count distilleries as clients, within Aberlour are investing in hydrogen
fuelled vehicles. Therefore, Elgin and Aberlour are two key strategic sites for a future hydrogen
hub based on foreseeable future demand. 
Notwithstanding, the social outcome assessment has revealed that the high need for socio-
economic intervention in places such as Buckie, Aberlour and Keith could be addressed by
deploying pilot hydrogen, end-use or storage projects within the area. It is noted that the highest
levels of unemployment and deprivation were observed in Buckie and as such the effects of a
community benefit strategy would be favourable. 
Due to Buckie’s strategic location on the Scottish North-East coast, it has high potential to serve
as a HRS for crew transport vessels transferring technicians to nearby offshore windfarms for
maintenance and technical surveillance. Nevertheless, from a traffic demand standpoint of view,
Elgin and Aberlour provide more advantageous prospects. 
Therefore, Elgin and Aberlour should be considered as potential HRS location for road haulage
end-users and Buckie should be considered as potential HRS for maritime end-users. Further
stages of the project should consider the feasibility of a dual-purpose HRS for supporting fuel
transition of both transport means. 
Page 42

Page 43

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
December 2023 
Page 3 of 86
To conclude, although not an exhaustive study on the qualitative and quantitative criteria set,
this report has provided greater context and detail on the matter of technical feasibility of a HRS
and ‘’hydrogen hub’’ development in Moray but also on how to retain the benefits of hydrogen
energy investment for the people and communities. 
Section 11 provides a list of recommendations to determine the most suitable and appropriate
HRS site for Moray and to maximise the leverage of a hydrogen economy within Moray.
Additionally, a Fuel Switching study was carried with the scope to highlight decarbonisation
opportunities for Moray Council’s fleet. For further information please refer to the separate
“Moray Hydrogen Strategy - Fuel Switching Strategy Report’’.
Page 43

Page 44

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
December 2023 
Page 4 of 86
1 Introduction
Moray is an ideal location to establish a hydrogen economy with direct access to existing and
future large scale renewable energy sources, including onshore and offshore wind power, and
reliable water sources, providing the essential resources required for green hydrogen
production. Moray Council has set an ambitious commitment to take a leading role to assist in
the Scottish Government’s target of a 75% reduction in regional emissions by 2030 and Net
Zero emissions by 2045.  
Hydrogen provides a sustainable alternative to burning fossil fuels and its contribution to helping
Scotland reach its Net Zero targets for industry, transport, power and heat is recognised by the
Scottish Government. Hydrogen, produced from renewable energy sources, is a zero carbon,
zero emission fuel that can be used for heavy duty vehicles including buses, trucks, agricultural
vehicles, marine vessels and trains, and also used to provide heat for industrial uses and for
homes. In addition to hydrogen, it is recognised that a significant amount of energy will also be
needed from other low carbon sources including electricity. 
The Scottish Government Hydrogen Policy Statement, published December 2020, sets out
Scottish Government support for the strategic growth of a strong hydrogen economy in
Scotland. The Minister for Energy, Connectivity, and the Islands provides the following vison in
the ministerial forward:
“Our vision is for Scotland to become a leading Hydrogen Nation in the production of
reliable, competitive, sustainable hydrogen and secure Scotland’s future as a centre for
international excellence as we establish the innovation skills and supply chain that will
underpin our energy transition. Scotland’s unique selling points, are its natural
resources, infrastructure and skilled energy workforce which enable us to become the
producer of lowest cost hydrogen in Europe by 2045.” 
The Scottish Government Draft Hydrogen Action Plan, published November 2021, sets out the
actions for the next five years to support the development of a hydrogen economy. The Cabinet
Secretary for Net Zero, Energy and Transport includes the following statement as part of the
ministerial forward:
“Hydrogen has a role to play across Scotland in our islands and rural communities,
cities and industrial clusters, and strategies for its production and application are
expected to vary across these geographic regions. We are committed to realising the
benefits of hydrogen to our regions and local communities and so will support regional
hubs of hydrogen activity across Scotland, recognising the differing resources,
strengths and focuses of each location.”
The Moray Hydrogen Phase 2 Strategy aims to expand on the previous phase of the project by
supplementing the initial scope of work by offering further support for the establishment of a
hydrogen stakeholder network, examination of hydrogen delivery infrastructure and actions
required to develop a hydrogen economy. Moreover, as the Council has expressed a strong
desire to provide ‘’a life of opportunity for all, where people can thrive in vibrant communities,
and where we work together to enrich our future.”, an in-depth social outcome analysis has also
been developed to help maximise the benefits of hydrogen investment. 
1.1 Project Background
Moray Council has committed to achieving Net Zero by 2030 and aims to provide the necessary
local and regional leadership to support businesses and communities in Moray to transition to
Page 44

Page 45

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
December 2023 
Page 6 of 86
net zero. Moray Council, along with Highlands and Islands Enterprise (HIE), recognise the
potential that hydrogen may play in this transition by providing an alternative source of energy to
traditional fossil fuels. 
Accordingly, in 2022 Moray Council commissioned Mott MacDonald to develop a strategy for
hydrogen; setting out the market context – particularly in light of the significant potential for the
use of hydrogen in Moray’s distilling industry – and proposing a set of short, medium and long-
term actions which establish the associated infrastructure requirements to produce, store and
supply hydrogen.
As part of that exercise, a key action is to pinpoint where the highest hydrogen demand is
coming from, and thus support the deployment of Moray’s first HRS or as part of a hydrogen
‘’hub’’. While the Phase 1 strategy report identifies a number of potential locations across
Moray, the initial considerations are very much ‘high level’. 
In the context of the Phase 2, the initial ‘high level’ considerations of the site selection are
further investigated based on an overarching set of criteria, such as hydrogen demand,
stakeholder proximity and engagement and social outcomes. This exercise will be scoring
criteria against the broad range of disciplines, for a comprehensive assessment of specific sites.
Additionally, a Fuel Switching study was carried with the scope to highlight decarbonisation
opportunities for Moray Council’s fleet. For further information please refer to the separate
“Moray Hydrogen Strategy - Fuel Switching Strategy Report’’.   
Page 45

Page 46

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
December 2023 
Page 7 of 86
2 Abbreviations 
Table 2.1: List of Abbreviations 
Abbreviation  Definition
AADF Annual Average Daily Flow 
CTV Crew Transport Vessel 
DfT Department for Transport 
ERSI Environmental Systems Research Institute 
EV Electric Vehicle 
HGV Heavy Goods Vehicle
HRS Hydrogen Refuelling Station 
ICE  Internal Combustion Engine 
LGV Light Goods Vehicle 
MoD Ministry of Defence 
NFRT National Road Traffic Forecast 
NHS National Health Service  
OWF Off-Shore Wind Farm
PSV Public Service Vehicle 
RAF Royal Air Force 
SME Subject Matter Expert 
Page 46

Page 47

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
December 2023 
Page 8 of 86
3 Hydrogen Demand Analysis 
3.1 Purpose  
This Hydrogen Demand Analysis has been prepared to support the selection of a  potential
location for Moray’s first Hydrogen Refuelling Station (HRS). Hydrogen demand is a decisive
factor when it comes to commitment to investment in hydrogen energy. 
As such this section presents a quantitative multi-criteria assessment supported by qualitative
information derived from stakeholders’ input to support the identification of a suitable HRS
location process. 
The analysis supplements the wider endeavour being undertaken to identify and assess
potential locations through a strategic assessment of locations using transport-specific criteria.
This assessment considers the five broad ‘hubs’ across the local authority area: Elgin,
Lossiemouth, Aberlour, Buckie and Keith. 
A plan showing the potential locations within Moray is provided in Figure 3.1.
Figure 3.1: Hydrogen Fuelling Station Potential Locations 
Source: Mott MacDonald 
Page 47

Page 48

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
December 2023 
Page 9 of 86
3.2 Overview 
This assessment aims to help identify the first of a series of future HRS locations with respect to
hydrogen demand. This analysis therefore seeks to determine where the most likely immediate
future demand will be located within Moray in order to help guide future decision-making. 
The widespread rollout of hydrogen-fuel vehicles (and crucially, the supporting refuelling
infrastructure) is still in its relative infancy compared to other non-ICE vehicle types (e.g.,
Battery Electric Vehicles). As such, the ability to accurately forecast the likely future uptake of
hydrogen as a vehicle fuel is limited.
However, the use of hydrogen as a vehicle fuel is increasing. First Bus has notably invested in a
fleet of hydrogen-fuelled double-decker buses in Aberdeen1. Feasibility and pilot studies
continue to build momentum both in the UK and abroad. The majority of these are focused on
commercial vehicles such as HGVs and LGVs and there are comparatively fewer hydrogen
manufacturers in the personal car market.
It therefore stands to reason that Moray will follow trends in hydrogen use seen elsewhere –
namely that initial uptake will be driven by commercial and fleet vehicles and latterly (if at all) by
personal car use. Within the context of this report, it is reasonable to assume that the locations
with the highest PSV, HGV and LGV flows will have the greatest immediate potential need in
future for a HRS and are therefore prioritised within the assessment.
As part of the initial development of the Moray Hydrogen Strategy, fleet owners were engaged
across Moray to establish fleet sizes, compositions, as well as any plans concerning fleet
transitions away from traditional ICE vehicles. These stakeholders were contacted again for this
phase, to update existing intelligence and in particular, identify if new plans for vehicle transition
have developed, or if existing plans have accelerated. Any information gathered is incorporated
into the assessment process.
3.3 Assessment Methodology
There are two separate elements to the methodology:
● A quantitative multi-criteria assessment considering the spatial distribution of fleet
locations, traffic flows and routing patterns across Moray to assess where the most likely
future demand for hydrogen fuel will be located.
● A qualitative stakeholder engagement exercise which seeks to draw out further detail from
major fleet owners in Moray; particular around fleet movements and compositions, as well as
any information regarding transition plans to hydrogen fuelled vehicles.
3.3.1 Multi-Criteria Assessment
In order to evaluate the suitability of each of the potential locations, a high-level quantitative
multi-criteria assessment was undertaken using a combination of traffic data and GIS software.
A set of scoring criteria was developed and used to assess each location in turn, with each
potential location assigned a ranking of one to five (i.e., ‘best’ to ‘worst’) as seen in Section 4.
Each criterion was then weighted based on the study team’s knowledge and current
understanding of the hydrogen vehicle roadmaps and a cumulative ‘final’ score was then
derived to identify the location with the greatest potential for Moray’s first HRS. Details of the
scoring criteria have been included in Table 3.1. 
1 https://www.firstbus.co.uk/aberdeen/plan-journey/zero-emission-mission/hydrogen-buses, last accessed 13
June 2023
Page 48

Page 49

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
December 2023 
Page 10 of 86
Table 3.1: Multi-Criteria Assessment Scoring Criteria  
Scoring Criteria Description Weighting Weighting Justification
HGV Flows Average HGVs flow on study
network
(within 10 minute drive of location) High
Most likely vehicle type to transition to
hydrogen fuel in the short-medium term and
therefore most likely to be indicative of initial
future demand for a HRS
LGV Flows Average LGVs flow on study
network
(within 10 minute drive of location) Medium
Suggestion that LGVs are a likely candidate to
transition to Hydrogen fuel in future, however,
likely to be slower uptake than HGVs and
PSVs and therefore considered secondary to
these vehicle types
Car/Taxi Flows Average Car/Taxi Vehicle flow on
study network
(within 10 minute drive of location) Low
Potential for transition to hydrogen-fuelled cars
and taxis in future but anticipated to be a much
lower level/uptake speed than both
HGVs/PSVs and LGVs
PSV Flows Average PSVs flow on study
network
(within 10 minute drive of location) High
Along with HGVs, another ‘most likely’ vehicle
type to transition to hydrogen fuel in the short-
medium term and therefore most likely to be
indicative of initial future demand for a HRS
Proximity to Key
Stakeholders
Number of stakeholders
(within 10km of location) Medium
Indicative of potential to support fleet
operations of key organisations within the local
authority
Proximity to Distilleries Number of distilleries
(within 10km of location)
High
Indicative of potential to support fleet
operations of industry widely considered to be
an ‘early’ adopter of hydrogen technology with
significant potential to translate into hydrogen
vehicle uptake
Source: Mott MacDonald 
DfT AADF counts2 have been used in the assessment and provide disaggregated counts of all
road vehicle types. The vehicle types used – as set out in Table 3.1 – are defined by the DfT as
follows:
● HGVs – all goods vehicles over 3.5 tonnes gross vehicle weight
● LGVs – goods vehicles not exceeding 3.5 tonnes gross vehicle weight
● Cars and Taxis – defined as passenger vehicles with nine or fewer seats
● PSVs – all public service vehicles and works buses which have a gross weight greater than
3.5 tonnes
NRTF growth factors have been applied to provide ‘future year’ traffic flows. An ‘opening’ year of
2025 has been assumed based on the proposed pilot project timelines set out in the Moray
Hydrogen Strategy.
DfT traffic data is only available for certain roads within the UK and as such, for Moray, the
study network is limited to the trunk road and A-roads within the local authority. Analysis of
these roads is considered reasonable for the scale of assessment and furthermore,
representative of traffic flows within the local authority. ESRI ArcMap software was used to
identify a 10-minute driving catchment for each of the proposed locations. Sections of the study
network which fall within each catchment were then assessed and an average vehicle flow for
each vehicle type was derived.
A plan showing each of the 10-minute driving catchments used to calculate traffic flows
alongside the Moray study network is provided in Figure 3.2. 
2 Department of Transport Road Traffic Statistics: https://roadtraffic.dft.gov.uk/#6/55.254/-6.053/basemap-
regions-countpoints, last accessed 13 June 2023
Page 49

Page 50

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
December 2023 
Page 11 of 86
Figure 3.2: Study Network & Driving Catchment Analysis 
Source: Mott MacDonald 
3.3.2 Stakeholder Engagement Exercise
The stakeholders who were previously engaged in the development of the Moray Hydrogen
Strategy were contacted again for phase 2. A sub-group of ‘transport’ stakeholders were
identified who are either owners or operators of sizeable fleets across Moray and the wider
region.
This list included Moray Council themselves, local freight and logistics operators, Ministry of
Defence (Kinloss Barracks, RAF Lossiemouth), Scottish Water, NHS Grampian, emergency
services, as well as major businesses located across Moray. A full list of those stakeholders
contacted by the study team has been included in Appendix A. 
The principal reason for this exercise is to understand if plans for vehicle fleet transitions to low
carbon technology have either developed or accelerated in the time since they were previously
contacted in early 2022. In addition, engaging with these stakeholders allowed the study team
to gather additional information not previously captured that may assist in the HRS site selection
process. For example, whether fleets operated solely within specific locations or if certain routes
were commonly used, strengthening the case for potentially higher levels of future hydrogen fuel
demand in a given location.
A total of 21 stakeholders were contacted with responses received from nine organisations
indicating a willingness to take part in the study. At the time of writing, consultations have been
completed via MS Teams with seven of the stakeholder organisations who initially responded.
The remaining two stakeholders were not available within the timeframe for the report and
therefore their input was not included in this report. 
Page 50

Page 51

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
December 2023 
Page 12 of 86
3.4 Assessment Limitations
Given that hydrogen-fuelled vehicles are not yet widespread, the study team are not able to
draw upon accurate forecasting tools which exist for other non-ICE vehicles (e.g. DfT forecasts
for Electric Vehicle adoption). However, given that this exercise constitutes a high-level review,
the approach of analysing traffic data across Moray’s strategic road network to derive future
potential hydrogen use is deemed reasonable and appropriate for the purposes of
supporting the initial HRS site selection process. 
Page 51

Page 52

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
December 2023 
Page 13 of 86
4 Multi-Criteria Assessment Findings
This section provides the results of the quantitative multi-criteria assessment. Traffic
movements across Moray, as well as the proximity of each potential location to fleet depots and
other stakeholder locations have been analysed to produce a ranked preference for each of the
potential HRS locations. Analysis for HGV flows, LGV flows, car and taxi flows, PSV flows, as
well as stakeholder proximity is presented in Sections 4.1 to  4.5 with a weighted ‘summary’
ranking provided in Section 4.6. 
4.1 HGV Flows
Figure 4.1 indicates the distribution of HGV flows across Moray. Road links highlighted in red
indicate the highest levels of HGV traffic, with those in green denoting the lowest. Red outlines
indicate the catchments used to analyse the potential future demand at each of the high-level
potential HRS locations. Analysis of this data has been summarised in Table 4.1.
Figure 4.1: HGV Flows 
Source: Mott MacDonald 
Analysis reveals that the highest HGV flows are concentrated along the ‘spine’ of the A96 as it
runs along a broad west-east axis from Inverness through Moray; particularly on those stretches
of road between the local authority boundary (between Nairn and Forres), through Elgin, to
Fochabers. This is unsurprising given the role of the A96 as a major transport artery across the
region. It plays a crucial role in connecting key towns across Moray and also serves as a
Page 52

Page 53

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
December 2023 
Page 14 of 86
strategically important route for freight across the wider region, particularly between Inverness
and Aberdeen.
Table 4.1: Potential HRS Location Ranking by Potential HGV Demand
Potential
HRS Location
Av. Daily HGV Flow
[within 10-minute drive]
Ranking
Elgin 380 1
Lossiemouth 335 2
Buckie 314 3
Keith 277 4
Aberlour 266 5
Source: Mott MacDonald  
This has resulted in those potential locations which are in close proximity to the A96 ranking
higher, with Elgin, followed by Lossiemouth as the preferred locations under this analysis.
Buckie ranking third is indicative of higher presences of HGV traffic along other strategic
regional routes; in this case on the A98 towards Buckie and the Moray Coast. The road network
south of Elgin (i.e., the A941 and A95) also registers high presence of HGVs – likely due to this
route serving as a key strategic road link southwards towards the A9 – but to a lesser degree
than elsewhere in local authority area.
4.2 LGV Flows
Figure 4.2 indicates the distribution of LGV flows across Moray. Road links highlighted in red
indicate the highest levels of LGV traffic, with those in green denoting the lowest. Red outlines
indicate the catchments used to analyse the potential future demand at each of the high-level
potential HRS locations. Analysis of this data has been summarised in Table 4.2.
Page 53

Page 54

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
December 2023 
Page 15 of 86
Figure 4.2: LGV Flow Analysis 
Source: Mott MacDonald 
Results for LGVs resemble that of the HGV analysis detailed in Section 4.6. The highest flows
are concentrated in around Elgin and broadly correlate with key arterial transport routes across
the region. The highest LGV flows are present on the A96 and, to a lesser degree, along the
A98 and A941. Most commonly used as commercial vehicles for distribution, courier services,
small-scale logistics and as tradesperson vehicles, this evidence confirms that higher LGV flows
are present in and around key population centres where such activity is likely to occur more
frequently.
Table 4.2: Potential HRS Location Ranking by Potential LGV Demand
Potential
HRS Location
Av. Daily HGV Flow
[within 10-minute drive]
Ranking
Elgin 1,330 1
Lossiemouth 1,290 2
Keith 1,154 3
Aberlour 1,081 4
Buckie 1,042 5
Source: Mott MacDonald
As such, analysis of LGV flows has again resulted in Elgin ranking the highest of the proposed
locations, followed closely by Lossiemouth in second and Keith third.
Page 54

Page 55

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
December 2023 
Page 16 of 86
4.3 Car/Taxi Flows
Figure 4.3 indicates the distribution of car and taxi flows across Moray. Road links highlighted in
red indicate the highest levels of cars and taxis, with those in green denoting the lowest. Red
outlines indicate the catchments used to analyse the potential future demand at each of the
high-level potential HRS locations. Analysis of this data has been summarised in Table 4.3.
Figure 4.3: Car/Taxi Flow Analysis 
Source: Mott MacDonald 
The highest levels of Car and Taxi traffic within Moray are clearly located within the vicinity of
Elgin. The A96 east of the town (between Elgin and Fochabers) and certain stretches of the
A941 northwards towards Lossiemouth are some of the most heavily trafficked routes within the
local authority. This is reflective of Elgin’s status as both Moray’s administrative centre and
largest settlement, with a total population of around 23,000.
Table 4.3: Potential HRS Location Ranking by Potential Car/Taxi Demand
Potential
HRS Location
Av. Daily Car/Taxi Flow
[within 10-minute drive]
Ranking
Lossiemouth 5,269 1
Elgin 5,043 2
Keith 4,106 3
Aberlour 4,013 4
Buckie 3,974 5
Source: Mott MacDonald
Page 55

Page 56

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
December 2023 
Page 17 of 86
However, analysis of each of the potential HRS locations as set out in Table 4.3 ranks
Lossiemouth, not Elgin, as the preferred location in this instance. This is likely due to the
proximity of, and interdependency between, Elgin and Lossiemouth in terms of services,
amenities and employment opportunities. Furthermore, the presence of RAF Lossiemouth is
likely to generate significant additional car traffic, including military personnel, civilian staff, and
visitors accessing the base.
4.4 PSV Flow
Figure 4.4 indicates the distribution of PSV flows across Moray. Road links highlighted in red
indicate the highest levels of PSV traffic, with those in green denoting the lowest. Red outlines
indicate the catchments used to analyse the potential future demand at each of the high-level
potential HRS locations. Analysis of this data has been summarised in Table 4.4.
Figure 4.4: PSV Flow Analysis 
Source: Mott MacDonald 
Figure 4.4 suggests that the higher PSV flows are again focused in and around Elgin, with
isolated instances of higher PSV traffic east of Elgin towards Buckie on the A98. Similar to the
analysis of car and taxi flows set out in Section 4.3, however, Lossiemouth ranks first out of the
potential HRS locations; followed closely by Elgin in second and Buckie in third. Again, this is
suggestive of the significant impact that proximity between the two settlements has on traffic
movements within the area. 
Page 56

Page 57

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
December 2023 
Page 18 of 86
Table 4.4: Potential HRS Location Ranking by Potential PSV Demand
Potential
HRS Location
Av. Daily PSV Flow
[within 10-minute drive]
Ranking
Lossiemouth 53 1
Elgin 51 2
Buckie 38 3
Aberlour 36 4
Keith 28 5
Source: Mott MacDonald
4.5 Stakeholder Proximity Analysis
Figure 4.5 reveals the proximity of key stakeholders to each of the potential HRS locations. Red
pins denote stakeholders included as part of our concurrent engagement exercise and green
pins denote distilleries. Analysis of each potential HRS location (including ranking) is
summarised in Table 4.5 and Table 4.6. 
Figure 4.5: Stakeholder Proximity to Proposed HRS Locations 
Source: Mott MacDonald   
Page 57

Page 58

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
December 2023 
Page 19 of 86
Table 4.5: Potential HRS Location Ranking by Proximity to Key Stakeholders
Potential
HRS Location
No. Key Stakeholders
[within 10km radius]
Ranking
Elgin 11 1
Lossiemouth 4 2
Aberlour 3 3
Buckie 2 4
Keith 0 5
Source: Mott MacDonald
Elgin with Moray’s largest population and serving as the local authority’s administrative centre,
ranks highest of the five potential HRS locations in the proximity analysis to key stakeholders.
Moray Council, local emergency services, NHS Grampian, Scottish Water and Stagecoach are
some of the organisations which have depots either nearby or within Elgin itself. Additionally,
RAF Lossiemouth is located less than 10km away from the centre of Elgin and could feasibly
make use of an Elgin-based HRS should this location be taken forward as part of the pilot.
Lossiemouth, with four key stakeholders within 10km, ranks second; although it should be noted
that these four would also be served by Elgin (likewise being within 10km of Elgin). 
Aberlour ranks third and, in addition to being geographically located at the centre of Moray’s
whisky industry, is also home to several businesses and logistics companies with sizeable
fleets, such as Carntyne Logistics and the Forsyth Group. Buckie and Keith ranked fourth and
fifth respectively with significantly fewer of the key stakeholders within range. It is worth noting,
however, that Baxter’s – a major local employer with a sizeable fleet and logistics operation –
would sit within range of a potential Buckie-based HRS location.
Predictably, the highly concentrated nature of the whisky industry within Moray has resulted in
Aberlour ranking first in the proximity analysis to distilleries. Located within the heart of
Speyside, an Aberlour-based HRS has the potential to support the operations of 21 nearby
distilleries including major whisky distillers such as Glenfiddich and Macallan. Elgin and Keith
ranked second and third with eight and five distilleries in close proximity respectively. Buckie
has only a single distillery nearby and Lossiemouth has none.
Table 4.6: Potential HRS Location Ranking by Proximity to Distilleries
Potential
HRS Location
No. Distilleries
[within 10km radius]
Ranking
Aberlour 21 1
Elgin 8 2
Keith 5 3
Buckie 1 4
Lossiemouth 0 5
Source: Mott MacDonald 
Page 58

Page 59

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
December 2023 
Page 20 of 86
4.6 Summary of Analysis
The results of the multi-criteria analysis are summarised in Table 4.7. Weightings, as set out in
Table 3.1, have been applied to each criterion with a summary ranking score subsequently
calculated.
Table 4.7: Potential HRS Location Ranking – Summary of Analysis
Potential
HRS
Location
HGV
Ranking
LGV
Ranking
Car/Taxi
Ranking
PSV
Ranking
Stakeholder
Proximity
Ranking
Distillery
Proximity
Ranking
Summary
Ranking
Elgin 1 1 2 2 1 2 1
Lossiemouth 2 2 1 1 2 5 2
Aberlour 5 4 4 4 3 1 3
Keith 4 3 3 5 5 3 4
Buckie 3 5 5 3 4 4 5 
Source: Mott MacDonald
The assessment reveals that Elgin scores highest amongst the five potential HRS locations.
The road network in and immediately around the town sees significantly higher average HGV
and LGV flows compared to Moray as a whole, as well as some of the highest average PSV
flows. Assuming that adoption of hydrogen fuelled vehicles materialises in line with anticipated
market trends, locating Moray’s first HRS near Elgin would likely serve the highest levels of
future demand across the local authority. Additionally, the high concentration of stakeholders
with sizeable fleets in and around Elgin cements the likelihood of future demand, particularly
amongst commercial vehicles.
Lossiemouth ranks second highest of the potential HRS locations – in large part due to its
proximity to both Elgin and some of the most heavily trafficked routes across Moray. Many of
the stakeholders located in Elgin itself are within a short distance and could equally be served
by a Lossiemouth-based HRS.
While scoring less than Elgin and Lossiemouth on traffic metrics, Aberlour ranks third based on
the potential to support stakeholders and, crucially, the whisky industry within Moray.
Comparatively, both Keith and Buckie scored poorly when considering both traffic metrics and
stakeholder proximity. While both are located on well trafficked routes spanning Moray, demand
is consistently higher in the west of the local authority. Furthermore, there are considerably less
stakeholder within close proximity to both locations, with far greater potential to serve higher
numbers of key stakeholders or distilleries in Elgin/Lossiemouth and Aberlour respectively. 
Page 59

Page 60

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
December 2023 
Page 21 of 86
5 Stakeholder Engagement Exercise
At the time of writing, stakeholder engagement discussions have been held with representatives
from the following organisations:
● Kinloss Barracks (MoD)
● RAF Lossiemouth (MoD)
● Carntyne Transport
● Forsyth Group
● NHS Grampian
● Scottish Water
● Moray Council
Representatives from each organisation are those who either have an interest in or
responsibility for transport and fleet operations. Discussions were held virtually via MS Teams
over the course of May and June 2023.
A broad topic guide was issued in advance of each session, with questions covering four
separate sections:
● Existing Fleets: an opportunity to establish fleet information if no previous data was made
available, as well as updates on both fleet size and composition if applicable.
● Fleet Movements: an opportunity to better understand the travel patterns and traffic
movements undertaken by fleets, with a particular focus on key routes, destinations and
service catchments. 
● Fleet Transition Plans: an opportunity to discuss current plans or aspirations to transition
existing fleet to hydrogen (and other non-ICE vehicle types) as well as timescales (i.e., short,
medium, long-term).
● Barriers: an opportunity for stakeholders to describe what they believe the key barriers are
with regards to fleet transition towards hydrogen.
● Final Thoughts: This segment provided stakeholders with a space to voice any further
thoughts not previously covered; including a preference (if any) for a potential HRS location,
as well as any other points they felt may be important to the ongoing study.
5.1 Existing Fleets
Fleet sizes of those stakeholders engaged ranged from a minimum of 150 to well over 500
vehicles. Generally, there has been very little change since initial engagement as part of the
development of the Moray Hydrogen Strategy with no sizeable expansions or reductions in the
number of vehicles.
Composition of fleets varies significantly, with some primarily comprising HGVs (Carntyne and
the Forsyth Group) and others focused more heavily on cars and lighter commercial vehicles
(Scottish Water and NHS Grampian). All stakeholders have HGVs as part of their fleets to some
degree. Kinloss Barracks, RAF Lossiemouth and Moray Council instead own fleets with a broad
range of vehicles; many of which are explicitly classed as service vehicles – for example, airside
vehicles at Lossiemouth or Moray Council’s fleet of gritters.
Page 60

Page 61

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
December 2023 
Page 22 of 86
5.2 Fleet Movements
Six out of seven of the organisations operate at, at least, a regional level with fleet movements
covering the breadth of Moray and in some cases operating into the wider Highlands and parts
of Aberdeenshire. Movements are typically made on the strategic road network, with some
(Carntyne and the Forsyth Group) also utilising cross-country routes southwards towards the A9
in their respective capacities at logistics services supporting the whisky industry. RAF
Lossiemouth was the only organisation stating that fleet movements were largely restricted
within the grounds of the airbase. The RAF notes that due to the high numbers of civilian and
military staff both living and working on site, there are around 1,300 cars driving to and from
Lossiemouth on a daily basis. Despite larger fleet vehicles operating locally, the base is
significant trip generator within Moray.
5.3 Fleet Transition Plans
All organisations noted aspirations to convert their fleets to more sustainable vehicle types.
Some, for example Kinloss Barracks, noted that while there is interest in conversion to hydrogen
fuelled vehicles, the current lack of supporting infrastructure has resulted, instead, in a
concerted focus on EVs. This is a general theme across the MoD estate where, currently, the
ability to refuel vehicles using hydrogen is extremely limited. As critical elements of the UK’s
defence infrastructure, locations such as Kinloss Barracks need to have a continual and
guaranteed fuel supply; something which is simply not possible with hydrogen at present.
Conversely, although RAF Lossiemouth too noted that vehicles were generally moving towards
battery electric, a successful trial of hydrogen vehicles at an airbase in England took place last
year and demonstrated the potential for viability for larger hydrogen vehicles supporting airside
operations. The RAF may therefore still consider hydrogen fuel as a potential option to
supplement fleet transition plans.
Public sector organisations, such as NHS Grampian, Scottish Water and Moray Council, noted
a willingness to transition to hydrogen fuelled vehicles. NHS Grampian in particular suggested
that in the longer-term it is hoped that HGVs and LGVs within their fleet would be hydrogen
fuelled. The current focus for these organisations – in line with respective net zero and carbon
reduction strategies – is addressing what is currently feasible. For both organisations, this
means converting cars and smaller commercial vehicles to battery electric vehicles in the
absence of widespread, commercially feasible hydrogen options.
In a similar vein, both Carntyne and the Forsyth Group noted the likelihood of fleets transitioning
in a similar manner. Cars and smaller commercial vehicles would likely switch to battery electric
vehicles, with HGVs and larger vehicles fully converting to Hydrogen. Crucially, both Carntyne
and the Forsyth Group expressed their intentions to convert their entire HGV fleets to hydrogen
in the future. Carntyne in particular advised of recent developments in applying for grant funding
to support these activities, as well as plans to bring a small number of hydrogen HGVs (3-4) into
their operations this year.
5.4 Barriers to Hydrogen Uptake
When asked what was preventing the conversion of fleets to hydrogen, organisations
unanimously noted the lack of available technology and supporting infrastructure required to
enable such activities. Some organisations noted that where technology is currently available,
restrictive costs – both in terms of capital investment (vehicles) and operations (fuel) – were the
primary barrier. Notably, Carntyne and the Forsyth Group; the two organisations with the
clearest strategies for moving forward with hydrogen uptake, also identified a lack of widespread
skills within the hydrogen technology space and supply chain. Both voiced concerns over a lack
of potential engineers to support the repair and maintenance of vehicles and equipment as and
when fleet conversion occurs. 
Page 61

Page 62

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
December 2023 
Page 23 of 86
5.5 Final Thoughts
Stakeholders were then given the opportunity to discuss any items not previously covered,
including a preference (if any) for a future HRS in Moray. Carntyne advised that in addition to
their plans for acquiring a small number of hydrogen HGVs, the organisation was also in the
process of undertaking a feasibility study into the development of site facilities which would
potentially enable on-site storage of hydrogen.
Broadly, Elgin was considered as a strong potential location for a future HRS. A location which
would “support the whisky sector” was also considered an appropriate choice by a number of
organisations. 
5.6 Implications for Hydrogen Refuelling Station Selection Process
Ultimately, our stakeholder engagement exercise revealed a broad consensus for the transition
of existing fleets to low-emission vehicle types. All stakeholders now hold strategies and policies
leading their respective organisations towards net-zero targets which include the uptake of both
battery electric, and hydrogen fuelled vehicles.
In line with our own understanding of potential market trends, fleet operators within Moray also
see a likely future where they operate ‘hybrid’ fleets; comprising smaller battery electric vehicles
for personal and commercial use and larger hydrogen fuelled service vehicles to support the
movement of freight, fuel and logistics.
Considering the results of the ranking exercise as set out in Table 4.7 none of the information
gathered as part of the stakeholder engagement exercise suggests that the rankings assigned
to Keith (4), or Buckie (5) should change. Aberlour (3), however, is home to two organisations
which have: expressed a strong preference for uptake in hydrogen fuelled vehicles; have
sizeable HGV numbers within their fleets; and (in one instance), are actively taking measures to
advance their own fleet transition plans. It is therefore deemed reasonable to lift Aberlour’s
ranking above that of Lossiemouth (2). While Lossiemouth is home to RAF Lossiemouth, the
organisation themselves have noted that in future, hydrogen vehicles would likely operate within
the confines of the base. A future HRS may therefore see limited wider benefits compared to
other high-scoring potential locations.
Given the broad preference for Elgin as a potential HRS location, it’s ranking at (1) remains
unchanged.
A revised summary ranking table considering the findings of the stakeholder engagement
exercise is included in Table 5.1. 
Table 5.1: Revised Potential HRS Location Ranking
Potential HRS
Location
Previous
Score
Change (After Stakeholder
Engagement Exercise)
Revised
Score
Elgin 1 – 1
Aberlour 3 ↑ 2
Lossiemouth 2 ↓ 3
Keith 4 – 4
Buckie 5 – 5
Source: Mott MacDonald  
Page 62

Page 63

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
December 2023 
Page 24 of 86
6 Social Outcomes 
Moray Council have expressed their strong wishes with respects to capitalising on the benefits
of a hydrogen economy to improve local communities by creating sustainable economic growth,
youngster retention in Moray and decreasing regional unemployment rates. As such, a nearly
exhaustive local needs assessment in all of the potential ‘’hub’’ locations was conducted.
Several key factors like labour markets in local areas, skills and training, local economy as well
as health and wellbeing have contributed to the overall evaluation. Please refer to Appendices
C to G for further detail. 
6.1 Moray – Local Context 
Moray, with an estimated population of 95,700, has 61.2% of its population in the working age
bracket, which is lower than both Scotland (63.9%) and UK (62.4%) averages. 77.4% of the
local population are economically active, with 17% of the workforce engaged in manufacturing,
10% in food and drink manufacturing, and 10% in tourism. In contrast to the Scotland and UK
averages, Moray has a significantly larger proportion of skilled trade occupations (13.2%) and
process plant & machine operatives (10.85%), and a lower share of employment in higher-level
occupations. 
Although the regional unemployment rate is lower in Moray than in Scotland and GB, there is a
marked increase in unemployment among the 16-24 age group. Reports indicate that a key
barrier to employment in the region is the disparity between young people and employers'
perceptions of entering the world of work. Specific barriers for young people are anxiety and
confidence issues (23%), the need for previous experience (22%), discrimination on age,
gender, or race (11%), health conditions (10%), and a lack of local opportunities (10%).
Fuel poverty is a significant issue in Moray affecting around 32% of households, the third
highest level of Scottish authorities. 
Approximately 300 businesses start each year in Moray, with a high proportion of micro and
SME businesses located in the region. Despite having a low business birth rate compared to the
Scottish average, perhaps owing to its unique health ecosystem, Moray has potential to become
a leading location for research and development in the life sciences, digital, and technology
sectors. The area has several purpose-built business parks located at Elgin and Forres, which
are home to thriving local businesses such as Hunted Cow, IT Central, Fibre 1, Orbex, and
Biomatrix Water Solutions.
6.2 Location Appraisal 
Moray is considered a natural location to establish a hydrogen economy and develop wider
green technologies to support Scotland’s renewable energy supply chain. There are significant
opportunities to generate local community benefits in relation to social, economic, and
environmental wellbeing. 
In this report, we assess five key locations across Moray to determine which requires the most
socio-economic and community benefit intervention to support council identify where pilot-
project, end-use or storage of hydrogen-based facilities should be based. 
The five locations as seen in Figure 6.1 have been selected based on the outcomes of the
potential demand assessment conducted as part of the scope for Phase 1: 
● Elgin 
Page 63

Page 64

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
December 2023 
Page 25 of 86
● Lossiemouth 
● Aberlour  
● Blackhillock (Keith)
● Buckie Harbour 
Figure 6.1: Map showing potential hydrogen ‘hubs’ 
Source: Moray Council 
6.3 Approach 
A desk-based analysis was conducted a desk-based analysis for each location. This involved
examining the relevant local development plans, economic development strategies, and area
profiles to gain a comprehensive understanding of the local needs. The aim was to determine
the level of local need across each site to determine which required the most socio-economic
and community benefit intervention to improve the outcomes of the area against Scottish
national averages.
We utilised socio-economic, public, and census data, along with baseline Scottish national
averages as seen in Table 6.2, to assign a score for each theme to each location using a
scoring matrix of one to five as per Table 6.1. The total score obtained for each location
determined its ranking, with higher scores indicating a greater local need for intervention. 
Four key themes were selected to categorise data and support our analysis, to determine how
each location performed was measured against each theme:
● Labour Market and Local Area – data researched included local population figures,
employment and unemployment rates, occupation groupings, and levels of deprivation.
Page 64

Page 65

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
December 2023 
Page 26 of 86
● Skills and Training – data researched included number of schools and colleges, local
education attainment, and proportion of skilled labour in the market.
● Local Economy – our research included explore current local businesses, diversity of local
economy, productivity rates and industry employment levels.
● Health and Wellbeing – data researched included greenspace per 1000 population,
community facilities and assets, and health and wellbeing data.
6.4 Location Ranking 
6.4.1 Scoring Matrix 
For this report, a scoring matrix that outlines the correlation between level of socio-economic
and community benefit intervention level of local need against Scottish national averages was
developed as seen in Table 6.1. The need, associated with each location’s performance and
ranking. The score assigned for each location is a cumulative figure out of 20 that reflects how a
location compares against Scottish national averages, and comparatively against each other
based on data contained within local development plans, and strategies. 
Table 6.1: Scoring Matrix 
Score 1 2 3 4 5
Site compared
to Scottish
average  
Significantly
better than
average
Better than
average Average Below average Significantly
below average
Level
intervention
needed 
Least                                                                                                                             Most 
Source: Mott MacDonald
6.4.2 Scottish National Baseline Criteria
Several key Scottish national baseline metrics and criteria were utilised to support the
development of the scoring matrix and map out the level of local need required for each of the
five locations as per Table 6.2.
Table 6.2: Scottish Baseline Statistics 
Theme Criteria Scottish Baseline
Statistics
Labour Market and
Local Area
Unemployment Rate (2022) 3.2%3
Percentage of population experiencing income deprivation 12%4
Percentage of population in managerial or professional
occupations (2011) 37.8%5
Skills and Training Percentage of population with no qualifications (2011) 26.8%6 
3 https://www.bbc.co.uk/news/uk-scotland-62560395
4 https://simd.scot/#/simd2020/BTTTFTT/9/-4.0000/55.9000/
5 Finalised Area Profile 2015 - ABERLOUR (yourmoray.org.uk)
6 Education | Scotland's Census (scotlandscensus.gov.uk) 
Page 65

Page 66

Mott MacDonald | | Moray Hydrogen Strategy  
Scoping Report Phase 2 
December 2023 
Page 27 of 86
Theme Criteria Scottish Baseline
Statistics
Percentage of population with a standard grade or
equivalent as highest qualification (2011) 23.1%7
Percentage of population with degree or professional
qualification (2011) 26.1%8
Percentage of people in skilled trades occupations (2011) 12.5%9
Health and
Wellbeing
Percentage of population who described their health as
‘very good’ or ‘good’ (2011) 82.2%10
Percentage of population who consider themselves limited
by a long-term health problem or disability (2011) 19.6%11
Percentage of population with a mental health condition
(2011) 4.4%12
Obesity rate per 100 patients (2011) 8.0513
Local Economy
Economic Activity Level (2019) 77.9%14
Self-employment rate (2019) 11%15
Participation in Manufacturing Industry (2019) 7.5%16
Gross Domestic Product Growth Rate (Dec 2022) 0.1%17
Source: Mott MacDonald      
6.5 Location ranking and scoring
This section presents the ranking for each location based on the desk-based analysis of
available socio-economic data. Each location was scored on a scale of one (least need) to five
(most need) for each theme, to identify which site requires the most socio-economic and
community benefit intervention. The location with the highest score was considered to have the
greatest need for intervention.
Through this scoring and ranking process, Buckie emerged as the highest ranked location,
indicating that both the site and local community would benefit from significant social and
economic intervention across all categories. On the other hand, Lossiemouth was ranked the
lowest, with relatively higher levels of good health, educational attainment, and employment.
For a detailed summary of scores and the justification that informed the ranking, please refer to
Table 6.3 below. 
7 Area Profile 2016 - LOSSIEMOUTH - Draft2 (yourmoray.org.uk)
8 Education | Scotland's Census (scotlandscensus.gov.uk)
9 Finalised Area Profile 2015 - ABERLOUR (yourmoray.org.uk)
10 Area Profile 2016 - LOSSIEMOUTH - Draft2 (yourmoray.org.uk)
11 Area Profile 2016 - LOSSIEMOUTH - Draft2 (yourmoray.org.uk)
12 Finalised Area Profile 2015 - ABERLOUR (yourmoray.org.uk)
13 Finalised Area Profile 2015 - ABERLOUR (yourmoray.org.uk)
14 https://www.hie.co.uk/media/6342/moraypluskeyplusstatisticsplus2019.pdf
15 https://www.hie.co.uk/media/6342/moraypluskeyplusstatisticsplus2019.pdf
16 https://www.hie.co.uk/media/6342/moraypluskeyplusstatisticsplus2019.pdf
17https://www.gov.uk/government/news/scottish-secretary-responds-to-gdp-for-q4-2022-and-december-2022
Page 66

Page 67

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report  Page 27 of 86 
Table 6.3: Location ranking against key themes 
Overview Labour Market and
Local Area Skills and Training Local Economy  Health and Wellbeing Total
Score Rank
Location Maximum Score 5 5 5 5 20 N/A
Elgin Score 4 2 1 4
11 4
Justification Elgin’s unemployment rate
has increased in recent
years, rising from 4% in 2011
to 6.49% in Dec 2022 –
significantly higher than the
national average. The town
also has high levels of
deprivation in the East – with
two areas ranking within the
most deprived 20% of data
zones, and one within the
most deprived 10% (figure.
A.1). These areas scored
poorly in and could benefit
from interventions in the
areas of education/skills,
income, and employment –
all which hydrogen
development could benefit.
However, although lower than
the national average, the
proportion of people in
managerial and professional
occupations is higher than
most site areas. Furthermore,
some areas in West Elgin
were within the least deprived
10% of data zones bringing
down the score.
After Lossiemouth, fewer
people have no
qualifications in Elgin
compared to the other
locations (26.6%). This is
also consistent with the
national average. There is
also a similar percentage of
people with (higher
education) degrees in Elgin
compared to Lossiemouth
and Aberlour. However, this
is still lower than the national
average. Elgin also has a
wider range of education
establishments compared to
other areas including the
only higher education
college in Moray – UHI
Moray. This greatly benefits
the skills and training of
people in the area.
Good level of
diversification and
identified as a primary
growth area in Moray
Local Development Plan
2020 – already a focus for
economic development
through creation of a
cultural quarter.
Intervention in this area
would have more benefit
in other towns. 
Following Lossiemouth,
people in Elgin reported
fewer health issues in the
2011 census compared to
the other locations. Elgin
also has a range of
community facilities and
green spaces. However,
health statistics in Elgin East
are significantly lower
compared to other parts of
Elgin, Moray, and the rest of
Scotland.
Lossiemouth  Score 1 2 3 1
7 5 Justification The local population is largely
employed by the local RAF
base, and as such the area
Lossiemouth has the
smallest proportion of people
who don’t have any
Market diversification is
lower in Lossiemouth due
to the significant presence
Lossiemouth has the lowest
levels of health or other
related issues compared to
Page 67

Page 68

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report  Page 27 of 86
Overview Labour Market and
Local Area Skills and Training Local Economy  Health and Wellbeing Total
Score Rank
has lower rates of
unemployment (4.3%)
compared with other sites.
The proportion of people in
managerial and professional
occupations is also higher
than the average for Moray
and Scotland. A hydrogen
economy could support future
labour market diversification,
however, other locations, e.g.
Buckie, would require more
immediate intervention. 
qualifications of the 5
locations (21.9%). This is
also significantly lower than
the national average
(26.8%). It also comes a
close second in terms of the
proportion of people who
have a (higher education)
degree (21.5%) – despite
this, the figure is still lower
than the national average.
of the RAF base which is
the primary employer.
Development of a
hydrogen and market
diversification could
benefit local residents by
supporting a more diverse
labour market, however,
compared to other
locations, Lossiemouth
does not require the most
intervention.
the other locations, as a
result, there is less need for
intervention compared to
other sites under
consideration.
Aberlour Score 1 4 4 5
14 2
Justification Aberlour has the lowest
levels of unemployment
(2.3%) compared to other
sites. Aberlour also has low
levels of deprivation, with all
areas in the town being
identified as the least
deprived 30% and 40% of
Scottish data zones. 
Although the proportion of
people in professional and
managerial occupations is
lower than the average, it is
mid-range compared to the
other site areas. Considering
this, other locations would
benefit more from
intervention.
Aberlour could benefit from
intervention in this area to an
extent. While it scores the
second highest % of people
who have no qualifications
(35.7%), and the lowest
percentage of people
achieving a standard grade
or equivalent compared to
other areas (23.5%), 21.8%
of the population have
(higher education) degrees –
the highest of all 5 sites.
Market diversification is
lower in Aberlour
compared to other areas
with 35% of the population
working in manufacturing
due to the proximity of the
food manufacturers and
whisky distilleries here.
The increased market
diversification that will be
brought about by
hydrogen development
can support the increase
in people working in
different industries.
Aberlour would benefit the
most from intervention in
this area. It has the lowest
proportion of people who
rated their health as ‘good’
or ‘very good’ compared to
the other sites and has a
significantly higher
proportion of people with
long-term health issues
compared to other sites and
the national average. 
Blackhillock
(Keith)
Score 4 5 2 3
14 2 Justification Keith had the second lowest
levels of unemployment of
the sites (3.4%). However,
only 20.6% of those
Keith has the highest % of
people who have no
qualifications compared to
the other locations (37.2% of
Good level of market
diversification however
majority of manufacturing
Other areas like Aberlour
and Elgin would benefit
more from intervention in
this area. Keith’s health
Page 68

Page 69

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report  Page 27 of 86
Overview Labour Market and
Local Area Skills and Training Local Economy  Health and Wellbeing Total
Score Rank
employed work within high
income occupations,
significantly lower than the
national average (37.8%),
and the lowest of all site
areas. Southern Keith has
higher levels of deprivation
compared to the North, with
one area being part of the
most deprived 30% of data
zones. 
population). It also has the
lowest percentage of people
who hold a degree or higher
degree (14.2%). Although
Keith has the highest
proportion of people in
skilled occupations
compared to the other
locations, and significantly
higher than the national
average, intervention is
particularly needed in skills
and training as parts of
Southern Keith (within most
deprived 30% of Scotland)
scored poorly in
education/skills.
linked to 4Nr whisky
distilleries located here.
statistics were mid-range
compared to other areas
and displayed similarities
when compared to national
averages. However, obesity
rates in Keith were
significantly higher than the
national average, and when
compared to the other
locations.
Buckie  Score 5 4 4 3
16 1
Justification Buckie is the second largest
town within the Moray region,
with the highest levels of
unemployment (9.7%) and
deprivation. Buckie also has
one of the lowest proportions
of people in high income
occupations compared to the
other locations. To improve
this, socio-economic
initiatives associated with a
hydrogen economy should
prioritise Buckie as an area of
focus. 
Buckie has the third highest
% of people who have no
qualifications (34%), and the
second lowest % of people
with a (higher) degree
(15.4%). However,
compared to the other sites
and the national average,
there is a higher proportion
of people who have
achieved a standard grade
or equivalent (28.9%). While
intervention may be needed
in terms of formal education
routes, practical skills in the
labour market is high with a
high proportion of people in
skilled occupations (18.7%). 
While market
diversification is highest in
Buckie compared to the
other locations, residents
have expressed that
access to quality
employment is a concern,
limited by poor transport
options. Buckie East also
scored poorly in terms of
income and employment,
contributing to the high
levels of deprivation in the
area. Buckie could benefit
from the economic impact
that hydrogen
development will bring to
the area.
Other areas like Aberlour
and Elgin would benefit
more from intervention in
this area. Buckie’s health
statistics were mid-range
compared to other areas.
However, a quarter of
community members in
Buckie Central East felt
powerless in their influence
on community matters.
Source: Mott MacDonald
Page 69

Page 70

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 30 of 86
6.6 Community Benefit Measuring Success 
To maximise the benefits of a potential hydrogen economy, aligned with four key themes, we
have identified several KPIs, and metrics that could be utilised to measure success of any
community benefit intervention, aligned to reflect the Scottish Government’s Community
Wellbeing Model. This is supported by a high-level list of potential initiatives that would help
deliver the council’s hydrogen community benefits objectives. 
Table 6.4: Initiatives and Metrics for Measuring Success
Theme Potential Initiatives  Metrics
1 Labour
Market
● Develop bespoke Employment and Skills
Plan (ESP) for all hydrogen related projects
in Moray
The ESP should identify employment and training
opportunities, including establishing and setting out
key KPIs, targets and focus areas for skills
development. Use the ESP to map out the pipeline
of potential opportunities to ensure stakeholders,
businesses and education providers have sufficient
capacity, skill, and resource to capture the benefits
of hydrogen in Moray.
● Ring fenced employment for residents
Consider ring-fencing a percentage of potential
employment opportunities resulting from a hydrogen
economy. Set a defined target and KPIs, e.g. 20%
local people employed per contract, with a stretch
target of 30% - 50%, and embed this commitment
into the supply chain and other contractual
agreements.
● Reduced levels of unemployment
● Improved employment rates
● Increased proportion of those employed in hydrogen related
sector 
● Wage growth due to higher paid employment opportunities
associated with hydrogen technology. 
● The number of full-time equivalent (FTE) employment
opportunities created for those who were made redundant
due to COVID-19.
● A defined target for ring-fencing jobs related to hydrogen
economy and development.
2 Training and
Skills
● STEM School Engagement
Connect with local schools to deliver STEM
workshops, events, talks and industry engagement
days to inspire the next generation about careers in
the hydrogen sector. To ensure there is consistent
and sustainable development of local skills and
knowledge around hydrogen, local project teams
can look to deliver engagement sessions (e.g.,
industry insight days, careers talk, project talks,
mentoring, CV advice, mock interviews) focused on
building awareness, providing an opportunity to
attract more people to hydrogen careers.
● Apprenticeships and Industry Placements
Work with local training and educational providers,
including UHI Moray, to develop bespoke
apprenticeship programmes, aligned with the
hydrogen based high-level specialist skills required
for the development of a hydrogen economy in
Moray. Set targets and KPIs to ensure
apprenticeships and industry placements are
delivered. Opportunities should be promoted and
support young people, those furthest from the labour
market, from disadvantaged backgrounds or from
underrepresented groups. 
● Work Placements
Develop a bespoke work placement programme
with defined targets. Identify relevant delivery
partners and educational institutions to deliver
programme. Focus on hydrogen skill development,
promoted to young people, those furthest from the
labour market, from disadvantaged backgrounds or
from underrepresented groups. 
● Improved business benefits 
● Increased training investment for local people
● Increased apprenticeships, internships, and graduate
opportunities in the decarbonisation space
● The number of apprenticeship opportunities (Level 2, 3, and
4+) created or retained.
● The number of training opportunities (Level 2, 3, and 4+)
created or retained.
● The number of people-hours of learning interventions
delivered.
● Work placements for local people to boost skills 
Page 70

Page 71

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 31 of 86
Theme Potential Initiatives  Metrics
● Improved Training Provisions 
Work with local education providers, universities,
and colleges, including UHI Moray, to identify gaps
in local skills and educational provision ahead of
ahead of a development of a hydrogen economy
create pipeline of relevant training and educational
courses. Utilise industry expertise to co-design
hydrogen training programmes and circulation to
ensure stakeholders have access to adequate and
best-practice training to capture opportunities
presented by the hydrogen industry.
3 Local
Economy
● Local Business Engagement
Explore developing a series of general
engagements with local businesses to increase
local awareness of hydrogen technologies and
associated business opportunities for organisations
willing to engage. This will help build early
awareness and provide the local supply chain
opportunities to upskill and build capacity.
● Meet the Buyer Events
Host regular Meet the Buyer Events as networking
opportunities for local businesses and SMEs to
ensure opportunities for wider supply chain
involvement are promoted to ensure businesses are
aware of upcoming opportunities and have sufficient
time to prepare to capture the opportunities
presented by hydrogen. 
● Supply Chain Capacity Building
Develop co-designed local supply chain capacity
building sessions with local businesses to identify
skills gaps, raise awareness of opportunities and
support collaboration across the local economy,
supporting market diversification.
● Regional and National Partnerships
Explore regional and national programmes across
the hydrogen supply chain to support more efficient
delivery and increase value for money. This may
also give communities and businesses greater
access to industry networks and best practice from
other schemes, helping to better inform local skills,
share best practice and knowledge development to
support an emerging hydrogen economy in Moray. 
● Higher levels of economic activity 
● Higher levels of employment
● Higher levels of median household income
● Increased external investment into Moray
● Increased green employment and supply chain opportunities
● Improved local market diversification and economic
development
4 Health and
Wellbeing
● Community Development Fund
Work with local community and organisations to
explore establishment of a dedicated local
community fund, to ensure profits or benefits of a
hydrogen economy directly feed back into the local
region or community projects, much like a social
enterprise model18. This could facilitate a community
development group to support and benefit from the
overarching hydrogen investment.
● Hydrogen fuelled Public Transport 
● Revenue generation for local community-led initiatives
● Investment in local businesses and transport
● Improved sense of community and social cohesion
● The number of people-hours spent supporting local
community integration, such as volunteering and other
community-led initiatives.
● The number of new wellbeing initiatives established. 
18 In the Netherlands, social enterprises (companies with a primarily social mission) are pioneering the transition
to a new economy, playing a crucial role in the transition of the business community towards creating a more
sustainable economy with social benefits. Various examples from the Dutch social enterprise sector illustrate
these activities, such as Tony’s Chocolonely, Fairphone and Frank About Tea.
https://www.social-enterprise.nl/english
https://business-spirit.news/news/dutch-social-enterprises-have-a-strong-influence-on-building-a-new-economy 
Page 71

Page 72

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 32 of 86
Theme Potential Initiatives  Metrics
Improved accessibility and public transport
provisions across Moray could support better
access to employment hubs and other community
assets that are essential to supporting a sense of
community. Explore utilising hydrogen technology to
develop a network of hydrogen bus shuttle routes for
stakeholders to improve accessibility and access to
opportunities.
● Green hydrogen for food production
The use of green hydrogen in food production, such
as hydroponic farming, can reduce the use of
harmful pesticides and improve the health and
wellbeing of both consumers and workers.
● Hydrogen for heating in homes and
buildings
In the long term, the use of hydrogen as a low-
carbon heating source in homes and buildings can
improve indoor air quality and reduce the risk of
respiratory illnesses associated with traditional fossil
fuel heating systems. Whilst a decision on the use
of hydrogen for heating domestic properties is still to
be made by the UK Government, this could be
explored, particularly as an option for off-grid
properties reliant on fuel oils or where other
renewable energy options are not available.   
Source: Mott MacDonald   
Page 72

Page 73

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 33 of 86
7 Road Refuelling Site Selection 
This section outlines the site selection process which uses the findings of a quantitative multi-
criteria assessment and the transport demand and social value analysis to recommend a
suitable location for Moray’s first HRS. This exercise will consider the five broad ‘hubs’ across
the local authority area; Aberlour, Buckie, Elgin, Keith and Lossiemouth.
7.1 Assessment Methodology
This evaluation aims to identify the most suitable location of the first of a series of future HRS
locations using the following elements: 
● A qualitative multi-criteria assessment considering factors such as land, power, water,
wastewater, road access, transport demand and social value.  
● Land – Available suitable land at site for building a refuelling facility.
● Power, Water, Wastewater – Proximity Utilities required for a refuelling facility. 
● Road Access – Ease of access for large vehicles, which are required for operations and
potentially users. 
● Transport Demand – Immediate transport (focus on PSV, HGV and LGV) demand. 
● Social Value – Social value to the area of developing a refuelling facility. 
The multi-criteria assessment was developed in the form of a scoring matrix, with each of the
prospect sites evaluated ranking from three to one (i.e., ‘’best’ to ‘worst’) as seen in Section  7.3. 
Each criterion was allocated a weighting to reflect its considered impact on the suitability of a
site location as outlined in Sections 7.2.1 to 7.2.7. 
An initial screening of each of the 5 selected locations was carried out. Sites from each location
were identified via desktop research, considering available space and proximity to potential
offtakers and main roads.
These sites were presented to Moray Council via a Teams call. The council identified sites that
were deemed to be unsuitable due to several issues that the Council had pre-existing
knowledge of e.g. flood risk etc. The remaining sites compiled the initial prospects which are
outlined below:
● Elgin 
– Ashgrove Road 
– A96 Travelodge Area 
– A96 Industrial Area 
– A941 adjacent to Culzean Avenue 
– A941 adjacent to Linkwood Road 
– Boroughbriggs Road/North Street 
● Lossiemouth 
– RAF Lossiemouth (“outside the wire” location) 
● Aberlour 
– A95 opposite Walker’s Head Office 
– A95 SW Aberlour 
● Keith
Page 73

Page 74

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 34 of 86
– Blackhillock Substation 
– A96 South Keith 
● Buckie 
– Buckie Harbour 1 
– Buckie Harbour 2 
– A942
Please refer to Appendices B to B.5 for a full overview of the prospect locations and sites. 
7.2 Multi-Criteria Assessment 
7.2.1 The Land
The site prospects were scored from three to one, i.e., from ‘’best’’ to ‘’worst’’ based on the
availability of land for constructing a hydrogen refuelling facility as follows:
● 3 - 3000m2 or more of available land for a hydrogen refuelling facility.
● 2 - Between 2000 and 3000m2 of available land for a hydrogen refuelling facility.
● 1 - 2000m2 or smaller of available land for hydrogen refuelling facility.
The size of the plot is a significant factor although as landowner engagement and geotechnical
properties of the land had not been considered, therefore the land criterion was allocated a high
weighting of 20%.
7.2.2 Power
The site prospects were scored from three to one, i.e., from ‘’best’’ to ‘’worst’’ based on the
distance to the nearest suitable power supply option (substation/high voltage cable):
● 3 – Nearest suitable power supply option is within 100m of site location.
● 2 – Nearest suitable power supply option is between 100-500m of site location.
● 1 – Nearest suitable power supply option is further than 500m of site location.
As a hydrogen refuelling facility without on-site production does not have significant power
demands, the power criterion was allocated a low weighting of 5%.
7.2.3 Water
The site prospects were scored from three to one, i.e., from ‘’best’’ to ‘’worst’’ based on the
distance to the nearest water supply option (water distribution pipe):
● 3 – Nearest water supply option is within 100m of site location.
● 2 – Nearest water supply option is between 100-500m of site location.
● 1 – Nearest water supply option is further than 500m of site location.
Water supply is an important consideration in the selection of a suitable site location, but it was
not considered as critical to the feasibility and cost of the project, therefore the water supply
criterion was allocated a low weighting of 5%. 
7.2.4 Wastewater
The site prospects were scored from three to one, i.e., from ‘’best’’ to ‘’worst’’ based on the
distance to the nearest wastewater main (gravity pipe):
Page 74

Page 75

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 35 of 86
● 3 – Nearest wastewater main is within 100m of site location.
● 2 – Nearest wastewater main is between 100-500m of site location.
● 1 – Nearest wastewater main is further than 500m of site location.
Due to the relatively low anticipated volumes of wastewater from the hydrogen refuelling facility,
the wastewater criterion was allocated a low weighting of 5%.
7.2.5 Road Access
The site prospects were scored three to one, i.e., from ‘’best’’ to ‘’worst’ based on the proximity
and access to a ‘main’ road (A-road):
● 3 – The site is located on or close (<100m) to a main road with no restrictions for large
vehicles.
● 2 – The site is reachable from a main road via several smaller but still accessible roads.
● 1 – The site has restricted access for large vehicles. 
Road access was a significant factor to consider as large vehicles will frequently be using the
facility. Hydrogen is likely to be delivered via tube trailer trucks and some potential users (HGVs,
buses etc.) are large vehicles, therefore the road access criterion was allocated a high
weighting of 20%.
7.2.6 Transport Demand
Each of the 5 ‘hubs’ were allocated a score from three to one, i.e., from ‘’best’’ to ‘’worst’ on the
results of the transport demand analysis on section 3.  The assessment involved analysing
traffic movements across Moray, as well as the proximity of each potential location to fleet
depots and other stakeholder locations to produce a ranked preference for each of the areas
selected as potential HRS locations. HGV flows, LGV flows, car and taxi flows, PSV flows, as
well as stakeholder proximity analysis were considered. The following scores were allocated: 
● 3 – Elgin and Aberlour were allocated a 3 as Elgin scored highly in HGV, LGV and PSV flows
and Aberlour has a high concentration of potential stakeholders nearby.  
● 2 – No areas were allocated a score of 2.
● 1 – Buckie, Keith, and Lossiemouth, were allocated a 1. Buckie and Keith both scored poorly
when considering both traffic metrics and stakeholder proximity. Lossiemouth scored
relatively highly in traffic metrics although upon engaging with the RAF, the organisation
stated that their hydrogen vehicles using the refuelling facility would operate only within the
confines of the base; however, the facility could be shared with others if it was located
“outside the wire”.
Transport demand is an important factor; therefore, this criterion was allocated a high weighting
of 25%.
7.2.7 Social Value
Each of the 5 ‘hubs’ were allocated a score from three to one, i.e., from ‘’best’’ to ‘’worst’ based
on the social value assessment scoring in Section 6. The assessment determined and scored
each of the 5 hubs’ need for socio-economic and community benefit intervention. It considered
the labour market and local area, skills and training, the local economy, and health and
wellbeing. Based on the scoring out of 20, the following scores were allocated:  
● 3 – Scored more than 15: Buckie.
● 2 – Scored between 10 and 15: Elgin, Aberlour, and Keith.
Page 75

Page 76

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 36 of 86
● 1 – Scored less than 10: Lossiemouth.
As outlined in the social value section, a hydrogen refuelling station can be the first step in
developing a hydrogen economy. If hydrogen continues to be adopted, this economy will
develop further and provide even more benefits to the local area. Therefore, social value has
been allocated a high weighting 20%. 
Page 76

Page 77

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 37 of 86
7.3 Scoring Results
Table 7.1 shows the results of the scoring process, including each prospect’s weighted total. For ease of comparison, an average of each criterion and
weighted total has also been provided.
Table 7.1: Final Scoring Matrix with Criteria Weightings
Site
Number Area/Site Land Power Water Wastewater
Road
Access
Transport
Demand
Social
Value
Weighted
Total
Weighting 20% 5% 5% 5% 20% 25% 20% 100%
1 Elgin: Ashgrove Road 2 2 3 3 2 3 2 2.35
2 Elgin: A96 Travelodge Area 3 1 3 3 3 3 2 2.7
3 Elgin: Industrial Area 2 2 3 3 2 3 2 2.35
4 Elgin: A941 adjacent to Culzean Avenue 3 3 3 3 3 3 2 2.8
5 Elgin: A941 adjacent to Linkwood Road 3 2 3 3 2 3 2 2.55
6 Elgin: Boroughbriggs Road/North Street Carpark 1 3 3 3 2 3 2 2.2
7 Lossiemouth: RAF 3 3 2 1 2 1 1 1.75
8 Aberlour: A95 opposite Walker's Head Office 1 2 2 2 3 3 2 2.25
9 Aberlour: A95 SW Aberlour 3 3 3 3 3 3 2 2.8
10 Keith: Blackhillock Substation 3 3 3 1 1 1 2 1.8
11 Keith: A96 South Keith 3 3 2 2 3 1 2 2.2
12 Buckie: Buckie Harbour 1 2 3 3 3 2 1 3 2.1
13 Buckie: Buckie Harbour 2 1 3 3 3 1 1 3 1.7
14 Buckie: A942 3 3 3 2 3 1 3 2.45
Average 2.36 2.50 2.79 2.50 2.29 2.14 2.14 2.28
Source: MML Analysis 
Page 77

Page 78

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 38 of 86
Generally, sites in Elgin and Aberlour scored highly. The sites in these towns all achieved an
above average weighted total, except for one site in Elgin, Boroughbriggs/North Street Carpark,
which scored 2.2. This is likely due to these sites scoring a three in transport demand, which
has a high weighting of 25%.
Sites in Buckie and Keith scored poorly, although the Buckie A942 site scored above average.
Again, this is likely to the transport demand score of one. The RAF Lossiemouth site was the
second lowest scoring site, which scored low in transport demand and social value, the only site
to score one in both. 
There were a range of scores for land, although only three sites scored one and the average
was still relatively high, which was 2.36. All the sites generally scored highly in the utilities’
criteria (power, water, and wastewater). These criteria had the three highest averages of 2.5,
2.79 and 2.5 respectively. With respects to the water criterion, no sites scored 1, i.e., ‘’worst’’
and therefore should not be an issue for a refuelling situation close to a town. 
Most sites had good road access and scored highly, however two sites scored one, Blackhillock
Substation and Buckie Harbour 2.
7.4 Site Selection Shortlist & Final Site Recommendation
Table 7.2 shows the site prospects ranked only by their weighted totals. 
Table 7.2: Site Prospects Ranked by Weighted Total Score
Rank Site Number Area/Site Weighted Total
1 4 Elgin: A941 adjacent to Culzean Avenue 2.8
2 9 Aberlour: A95 SW Aberlour 2.8
3 2 Elgin: A96 Travelodge Area 2.7
4 5 Elgin: A941 adjacent to Linkwood Road 2.55
5 14 Buckie: A942 2.45
6 1 Elgin: Ashgrove Road 2.35
7 3 Elgin: Industrial Area 2.35
8 8 Aberlour: A95 opposite Walker's Head Office 2.25
9 6 Elgin: Boroughbriggs Road/North Street 2.2
10 11 Keith: A96 South Keith 2.2
11 12 Buckie: Buckie Harbour 1 2.1
12 10 Keith: Blackhillock Substation 1.8
13 7 Lossiemouth: RAF 1.75
14 13 Buckie: Buckie Harbour 2 1.7
Source: MML Analysis
As shown in the table, the three highest scoring sites at the end of this stage of the assessment
were as follows:
● Site 4 - Elgin: A941 adjacent to Culzean Avene
● Site 9 - Aberlour: A95 SW Aberlour
● Site 2 - Elgin: A96 Travelodge Area
Table 7.3 shows the designation for each of the site prospects, if applicable, under the Moray
Local Development Plan 2020 as well as further feedback subsequently provided by Moray
Council on the availability of the site and any other constraints to be considered.
Page 78

Page 79

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 39 of 86
Table 7.3: Moray Local Development Plan Status and Moray Council Feedback 
Rank  Site
Number
Area/Site Moray Local
Development Plan 2020
Moray Council
Comments
1
4 Elgin: A941 adjacent to
Culzean Avenue
LONG2 Elgin South
Designated as long-term
housing site
Not suitable due to strategic
housing designation and close
proximity to existing residential
properties 
2
9 Aberlour: A95 SW
Aberlour
R2 Speyview
Designated for 60 houses and
1ha of industrial land
Not suitable due to strategic
housing designation. Also
close to existing residential
properties. Site also forms part
of Council’s Strategic Housing
Investment Programme (SHIP)
and is subject to a live
planning application
(23/00494/APP)
3
2 Elgin: A96 Travelodge
Area
I7 Barmuckity Business Park
Designated as industrial estate 
Acceptable site in principle
Consideration would need to
be given to the overhead
power line and required
clearances
4
5 Elgin: A941 adjacent to
Linkwood Road
OPP1 Flemings Sawmill,
Linkwood Road
Designated for mixed uses
including commercial and/or
industrial
Not suitable. 
Adjacent to Gleaner Milnefield
(Hazardous Site)
Potential for contamination
issues due to former use as
sawmill
Known surface water flooding
and transportation issues on
site and immediate area. Site
has potential to play significant
role in addressing these
Potential masterpan for this
area through levelling up fund
5
14 Buckie: A942 MU High Street (W)
Designated for mixed uses
including residential and/or
class 2 & 4 users
Not suitable. 
Potential issues due to
proximity to two adjacent
petrol stations
6
1 Elgin: Ashgrove Road OPP4 Ashgrove Road
Designated for mixed uses
including housing, industrial
and/or commercial uses
Acceptable site in principle
Potential for contamination
issues due to former use as
railway and gas works
7 3 Elgin: Industrial Area I6 Linkwood East
Industrial Estate
Not suitable – currently
occupied by car dealership
8
8 Aberlour: A95 opposite
Walker's Head Office
N/A Not suitable – potential road
safety issue due to location
opposite junction
Prime Agricultural Land
9
6 Elgin: Boroughbriggs
Road/North Street
OPP8 Lossie Green
Designated for mixed uses
including leisure, office and/or
retail
Not suitable – potential
ownership issue (Public
Trust/Common Good)
Site plays significant strategic
role in the Elgin City Centre
Masterplan and Moray Growth
Deal (Cultural Quarter project)
10 11 Keith: A96 South Keith ENV6 Denwell Road Acceptable site in principle
Page 79

Page 80

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 40 of 86
Rank  Site
Number
Area/Site Moray Local
Development Plan 2020
Moray Council
Comments
Potential ownership issue
(Common Good to the north of
area)
11
12 Buckie: Buckie Harbour 1 N/A Acceptable site in principle
Potential for contamination
issues due to former uses
Consideration will need to be
given to Buckie Harbour
Masterplan (in development)
12
10 Keith: Blackhillock
Substation
N/A Acceptable site in principle 
Links to the Keith Green
Energy & Infrastructure
Frameworks
13 7 Lossiemouth: RAF N/A Not suitable – rural location
away from main routes in area
14
13 Buckie: Buckie Harbour 2 OPP4 Bank Street / 
I5 Harbour Area
Acceptable site in principle
Consideration will need to be
given to Buckie Harbour
Masterplan (in development)
Source: Moray Local Development Plan and Moray Council 
As outlined in the table above, Site 4 (Elgin: A941 adjacent to Culzean Avenue) and Site 9
(Aberlour: A95 SW Aberlour) have been designated as land for housing development in the
Moray Local Development Plan and are considered unsuitable for construction of a hydrogen
refuelling station. The three highest scoring site prospects considered acceptable in principle
are as follows:
● Site 2 - Elgin: A96 Travelodge Area
● Site 1 - Elgin: Ashgrove Road 
● Site 11 - Keith: A96 South Keith
As the site prospects in Keith generally scored poorly, with both Site 11 and Site 10 scoring
below the average weighted total, whilst site prospects in Aberlour scored higher due to the
increased transport demand, it is recommended that, instead of shortlisting Site 11, alternative
site locations in Aberlour are explored in the next stage instead of shortlisting Site 11. 
Site 2 and Site 1 are described in further detail in the sections below:
7.4.1.1 Location 2 – Elgin: A96 Travelodge Area 
The Elgin: A96 Travelodge site is the highest scoring site once those considered not in line with
the Moray Local Development Plan or unsuitable for other reasons had been ruled out. It scored
3 in land, water, wastewater, road access, and transport demand, a 2 in social value and 1 in
power. The site achieved a weighted total of 2.7. 
The proposed site is situated in a ‘service station’ style break area east of Elgin on the A96. It is
understood that there are multiple plots that are not currently being used. The selected plot can
be seen in Figure 7.1 below.
Page 80

Page 81

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 41 of 86
Figure 7.1: Elgin: A96 Travelodge Area Site Location 
Source: ArcGIS
Figure 7.1Error! Reference source not found. shows the proposed site area, and the
construction of the rest of the businesses at the service stop. The ArcGIS satellite image was
taken in 2021, hence the other businesses yet to be built. Today, the Travelodge hotel, Shell
Petrol station, Starbucks and several smaller commercial buildings are built and are operating.
The highlighted area for the proposed site is larger than what is required for a hydrogen
refuelling facility without on-site production.  
For utilities, this site scored 3 for water and wastewater, however scored 1 for power. The
several businesses close by are currently supplied by infrastructure that can be utilised for the
refuelling facility. This can be seen in the following figures.
Figure 7.2: Elgin: A96 Travelodge Area Power Supply 
Page 81

Page 82

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 42 of 86
Source: ArcGIS 
The nearest connection to a HV cable would be around 400m east of site further along the A96.
This can be seen in Figure 7.2. However, this power distribution data may be out of date as the
service stop could have had an extension since it is recently built. It is recommended further
research and stakeholder engagement is carried out to understand the available power
infrastructure in the area. 
Figure 7.3: Elgin: A96 Travelodge Area Water Distribution 
Source: ArcGIS
Page 82

Page 83

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 43 of 86
Figure 7.4: Elgin: A96 Travelodge Area Wastewater Discharge   
Source: ArcGIS
Figure 7.3 and Figure 7.4 show the water and wastewater mains in the proposed site and the
surrounding service stop area. It is a comprehensive network covering all the plots and should
not be an issue for this site. 
As the site is located adjacent to the A96 it scored 3 in road access as large vehicles will not
have any restrictions accessing the facility. 
As this site is in Elgin, it scored 3 and 2 in transport demand and social value respectively. Elgin
scored highly in transport demand as it has high heavy-goods transport flows and many
potential industrial users in the area. This site also adjacent to the A96, the main travel route
between Aberdeen and Inverness. Elgin scored 2 in social value as it is largest town and
commercial centre in Moray, and therefore is not in high need of intervention. Please see
sections  7.2.6 and 7.2.7 and for further detail into why these scores were allocated.
7.4.1.2 Location 2: Elgin Ashgrove Road
Elgin Ashgrove Road was the 6th highest scoring site in the overall scoring matrix and 2nd of
those considered suitable by Moray Council. It scored 3 in the water, wastewater and transport
demand criteria and 2 in the remaining criteria, with a final weighted score of 2.35 which is
slightly above the average of 2.28.
The site is located in central Elgin on Ashgrove Road next to the Howden’s Kitchen Furniture
shop. It was identified as it is a large brownfield plot of land which appears to be unused and is
located near the A96 and several industrial estates with potential commercial users as well as
the Moray Council Ashgrove Depot. The A96 is the main travel route between Elgin and
Aberdeen, as outlined Section 3. 
Page 83

Page 84

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 44 of 86
Figure 7.5: Elgin: Ashgrove Road Site 
Source: ArcGIS 
There is up to 6700 m3 of available space on this plot which is larger than required and
therefore allows flexibility in the position and layout of a hydrogen refuelling station.
Elgin: Ashgrove Road scored 2 for the Power criterion as the available data does not indicate
any immediately adjacent power supply options but there are HV power cables and substations
within 500m of the site as shown in Figure 7.6.
Figure 7.6: Elgin: Ashgrove Road – Power 
Source: ArcGIS 
The site scored 3 for both the Water and Wastewater criteria given the access to the Scottish
Water water distribution and wastewater networks on Ashgrove Road immediately adjacent to
the site location. This is shown in Figure 7.7.
Page 84

Page 85

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 45 of 86
Figure 7.7: Elgin: Ashgrove Road Water Supply & Wastewater Discharge 
Source: ArcGIS 
Although the site is located in close proximity to the A96, it has been scored 2 for road access
as it would need to be accessed via Ashgrove Road which is still considered acceptable for
large vehicles but less preferable than access directly from the A96.
As with the Elgin: A96 Travelodge Area site, this site also scored 3 and 2 in transport demand
and social value respectively as Elgin is located on the A96, has a high heavy-goods transport
flow and numerous potential industrial users in the area and is not considered to be in high
need of intervention in relation to social value. Please refer to sections 7.2.6 and 7.2.7 for
further detail on allocation of these scores for Elgin.
7.4.2 Final Site Recommendation
At this stage of site selection process, the current recommendation is for a hydrogen refuelling
facility to be constructed at Location 1 (Elgin: A96 Travelodge area), subject to assessment of
whether the required clearances can be achieved underneath the overhead power line. There is
a large plot of land currently not being used, which is larger than required for a refuelling facility
without on-site production. There is easy access to the required power, water, and wastewater
utilities. In addition, Elgin also scored highly in transport demand and the proposed plot is on a
main travel route between Elgin and the South, A941. It also achieved an average social value
score. 
Although this is the current recommendation, further investigation into land ownership,
stakeholder engagement and site visits may highlight a more suitable site. This proposed site is
also located close to residential estates which may require additional permissions and
approvals.
The Elgin: Ashgrove Road site should be retained as a backup option in Elgin should the A96
Travelodge Area site be found to be unavailable or unsuitable during further investigation. 
Additionally, as both sites in Aberlour have been found unsuitable based on the Moray Local
Development Plan but generally scored highly due to the transport demand in Aberlour, it is
Page 85

Page 86

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 46 of 86
recommended that alternative site options in line with the Moray Local Development Plan within
Aberlour are explored during the next stage and compared to the sites above before any final
decision is made on site selection.
It should also be noted that the new Moray Local Development Plan is currently being
developed and is expected to be adopted in 2027 and it is recommended that future work also
considers how this hydrogen strategy could feed into the development of the new Moray Local
Development Plan.
Page 86

Page 87

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 47 of 86
8 Road Refuelling
8.1 Overview
Hydrogen Refuelling Stations are provided to dispense hydrogen for transport use. The
hydrogen supply pressure for large vehicles such as refuse trucks, buses, and HGVs is typically
350 bar, since larger vehicles such as buses and trains tend to have more available storage
space, while cars and smaller commercial vehicles have adopted the 700-bar standard. 
A Hydrogen refuelling station typically consists of the following main components: 
● MP hydrogen storage tank: 
● Hydrogen HP gas compressors, 
● High pressure hydrogen storage tanks, and
● Hydrogen dispenser. 
Hydrogen refuelling station equipment is now widely available from many suppliers within the
UK and Europe for hydrogen cars, busses, and HGVs. 
Hydrogen refuelling stations can store and dispense hydrogen in the form of either liquid or gas.
Refer to Figure 8.1: Typical Hydrogen Refuelling System for an example of main equipment and
process for a typical gas HRS. While liquid hydrogen can reduce storage footprint requirements,
it requires an intensive cooling system which can be more energy intensive compared to
hydrogen gas. 
A hydrogen refuelling station that can produce 1000 to 1125kg of hydrogen a day is suitable for
operating approximately 30 HGVs per day. 
Figure 8.1: Typical Hydrogen Refuelling System 
Source: Mott MacDonald
8.1.1 Storage
Within Moray, it is assumed that local hydrogen will be bulk stored as pressurised gas (separate
liquid hydrogen storage may be required depending on identified liquid hydrogen consumers),
so pressurized storage will be required on site.
Page 87

Page 88

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 48 of 86 
Compressed hydrogen storage options include:
● In horizontal or vertical cylindrical tanks (50-80bar) with capacities from 1,300m3 to 4,500 m3
(diameters of up to 2.8m and lengths from 7.3m to 19m).
● Spherical vessels with capacities of about 2,000m3, pressurised to about 185bar.
● Tubular high-pressure storage 50 to 500bar. These are the most common high-pressure
vessels today and can be carried on trailers for flexible low-demand transportation. One tube
trailer can deliver approximately 280 kg of hydrogen.
● Hydrogen transmission pipelines can also be used as storage by increasing the pressure
inside the pipeline (termed linepack). The storage capacity depends on the size and strength
of the pipeline, although this will only be realised if there is a scale transition to a hydrogen
economy.
8.1.2 Layout & Footprint
The land footprint requirements are influenced by the traffic intake, i.e., refuelling rates and size
of the hydrogen system. 
A typical HRS, with on-site generation of hydrogen, is the HyBont Green Hydrogen Project19 in
Bridgend. This is shown in more detail in Figure 8.2. This facility has the capacity to produce
1200kg/day and has 3 goods vehicle dispensers.
Figure 8.2: Typical Hydrogen Refuelling Station Layout 
Source: HyBont
This example layout includes on site production. If this was not required this will reduce the
necessary footprint. However, if hydrogen is transported tube trailers then greater separation
distances will be required to account for the tube trailers. In addition, this example layout is not 
19 HyBont Green Hydrogen Project, https://www.hybont.co.uk/index.html, Accessed on 6 February 2023 
Page 88

Page 89

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 49 of 86
directly joined to a main road, you need to access using the side roads leading to the facility.
This will significantly increase the footprint. Excluding the production components and side
roads, the estimated footprint of the layout presented in Figure 8.3, is 1500m2. Including all the
elements the footprint is approximately 10,000m2.
The example hydrogen site, shown in Figure 8.3, has its pumping area directly parallel to the
road, unlike the previous example. It has the capacity to capacity to produce 360kg of hydrogen
daily via 1 dispenser.
Figure 8.3: Aberdeen BOC Hydrogen Refuelling Station 
Source: ArcGIS
Although this site also has hydrogen production on-site, as it has reduced footprint being
parallel to the road, the estimated footprint of this layout is 1150m2.
A typical HRS, with the required separation distances to account for tube trailers, has a footprint
of approximately 2000m2. 
Page 89

Page 90

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 50 of 86
9 Maritime Refuelling & Footprint 
As part of the Phase 2 scope to further develop the Moray Hydrogen Strategy and delivery plan
for a hydrogen economy, this section focuses on the maritime sector hydrogen refuelling
infrastructure. The Moray hydrogen and maritime economy can benefit from hydrogen fuelled
vessels, as pure hydrogen is a key option for short distance ships and vessels. 20 
Electrolytic hydrogen can power Crew Transport Vessels from Buckie Harbour to nearby OWFs
to enable technicians to carry out required maintenance work.
To understand the feasibility of such endeavour, a high-level study of the necessary bunkering
infrastructure and land footprint was developed. 
9.1 Buckie Harbour 
Buckie Harbour is the main commercial harbour in Moray and could act as an HRS for the
maritime sector. Buckie Harbour is the base for the Operational and Maintenance teams for a
number of the Moray Firth Off-Shore Wind farms and CTVs operate from Buckie Harbour.
Buckie Harbour is also the main fishing harbour in Moray.
The CTVs would be used to transport technicians to nearby offshore windfarms to be developed
in the Outer Moray Firth area such as the 950 MW Moray East Offshore Windfarm 21 as seen
Figure 9.1 below. 
In addition, the fishing industry along with other local industries (e.g.  the Boormalt Maltings)
have a number of HGV movements that would potentially support an HRS at this location.
As outlined in Section 7, there are two site locations (Sites 12 and 13) currently being
considered at Buckie Harbour for a Hydrogen Refuelling Station. Although these are both
acceptable sites in principle, subject to the Buckie Harbour Masterplan which is currently in
development, they both scored relatively low in comparison to alternatives, particularly in Elgin
and Aberlour. However, Buckie Harbour has expressed an interest in an HRS located at the
harbour for maritime refuelling, it is therefore recommended that the option to construction an
HRS at Buckie Harbour for maritime refuelling in addition to an HRS for HGVs located in Elgin
or Aberlour is explored further during the next stage. It is also recommended that this future
work also explores options for hydrogen export from Buckie. 
20 MML 
21 Moray Offshore Wind Farm (East) Ltd., 2020
Page 90

Page 91

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 51 of 86
Figure 9.1: Scotland North-East Coast 
Source: Google Earth Pro  
Using Google Earth Pro the distance between the harbour and the Moray Firth region was
estimated to be approximately 57km or 114km for a roundtrip. 
In 2022, Cramer H., et. al., has conducted a study on the hydrogen usage of a CTV fleet for
offshore maintenance. Based on the data presented in this study, the average ratio of fuel to
distance has been estimated to be approximately 1.7kg of H2 per km. It is noted that weather
effects have not been included in the estimation of hydrogen consumption. 
Table 9.1: Average distance sailed and estimative hydrogen consumption for the year of
2020 for Vessels22 
Month  Distance (km) Hydrogen (kg)  Ratio kg/km 
January  410,000 1,250,000 1,6
February 410,000 1,250,000 1,6
March  405,000 1,250,000 1,7
April 610,000 2,550,000 2,3
May  180,000 625,000 1,9
June 410,000 1,850,000 2,4
July  350,000 1,250,000 1,9
August  400,000 1,650,000 2,2
September  190,000 625,000 1,8
October  150,000 300,000 1,1
November  160,000 300,000 1,0
December  150,000 300,000 1,1 
22 Cramer et.al., 2022 & MML Analysis
Page 91

Page 92

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 52 of 86
The overall roundtrip of a CTV would therefore require 194kg of H2. An 80% for emergency
purposes is assumed to needed, 155kg of H2 and thus the total demand per CTV is 345kg of
H2. Assuming two CTVs leave Buckie Harbour bi-weekly for maintenance and repair works, the
total demand of the Moray HRS would be 1395kg of hydrogen fuel. 
9.2 Infrastructure Requirements 
The working assumption is that electrolytic hydrogen is going to be transported via tube trailers
from a nearby green hydrogen production facility. Therefore, the main infrastructure
requirements for Buckie Harbour are listed below and represented in: 
● Hydrogen Unloading connection point(s)
● Hydrogen HP Storage Tank(s)
● Hydrogen Dispenser 
● Supporting Equipment (Air Coolers etc.) 
Figure 9.2: Hydrogen Refuelling Station Required Infrastructure 
Source: Mott MacDonald  
Tube trailers would transport the hydrogen to the Buckie Harbour Area, where they would
unload the fuel into HP 350barg storage and then dispensed onto the CTV. 
9.3 High Pressure Storage 
The green hydrogen will be transported via tube trailers with operating pressures ranging from
30 to 500barg. This hydrogen would be then unloaded into storage tanks. 
High-pressure storage allows for faster refuelling rates 23 as well as higher fuel energetic density
24. A typical high pressure storage system is made up of a tube rack storage, as seen Figure 9.3
often 0.5m in diameter and 10m long25 i.e., a volume of 1.96m3 and surface area of 16m2. 
23 Sadi, M., 2019 https://doi.org/10.1016/j.ijhydene.2019.05.023  
24 Xiao, J. 2016 & Liu, Y.L., 2010 https://doi.org/10.1016/j.ijhydene.2016.06.084
25 Hyde, 2019 feasibility-of-hydrogen-bunkering-final-080419.pdf (northsearegion.eu)
Page 92

Page 93

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 53 of 86
Figure 9.3: Hydrogen Tube Rack High Pressure Storage   
Source: Google Images
Gaseous hydrogen would imply storage of high-pressure flammable gas on the ship. Moreover,
during the bunkering process, hydrogen is being compressed into storage cylinders. During this
adiabatic compression process, heat is being resealed and thus increasing tank temperature.
This is problematic as most storage vessels have maximum design temperature ranging from
70 to 85°C 26. To mitigate a possible storage tank failure, bunkering requires slow and chilled
operation27. The SAE J2601 Protocol for automotive appliances specifies that hydrogen gas for
refuelling purposes should be cooled down to -40°C with a fuelling rate of approximately 1kg of
hydrogen per minute28.  
9.4 Hydrogen Dispensers 
As per Hyde, 2019 dispensers are critical in the case of maritime refuelling, as the vessel is
non-stationary, but in continuous motion due to tides and swells. The 350barg filling nozzle
should be attached to by rigid arm via a retractable hose to allow for movement and ship height
differences considerations. Safety measurements, like providing the system with a ‘’break-away
coupling’’ are necessary should the vessel moves further the maximum hose length, to prevent
the leak of hydrogen gas. 
A notable mention is the heat release as a result of adiabatic compression must be monitored
when refuelling, and therefore dispenser nozzles should be equipped with appropriate
instruments to monitor the flow of hydrogen temperature. Conditioning and cooling of the
hydrogen prior to refuelling may be required. 
9.5 Bunkering
In maritime bunkering, the refuelling operation can be performed at either 350barg or 700barg
depending on the necessary volumetric energy density. 
Multiple factors are going to affect the bunkering system, such as the ones below: 
● Type of bunkering method: pressure balancing, compression onto ship 
26 Bourgeois et.al., 2015 doi:10.1016/j.ijhydene.2015.01.096
27 Bourgeois et.al., 2015 doi:10.1016/j.ijhydene.2015.01.096
28 Reddi, K., et.al., 2017 https://doi.org/10.1016/j.ijhydene.2017.04.233
Page 93

Page 94

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 54 of 86
● Ship’s target pressure 
● Bunkering times 
● Hydrogen Tank Capacity and Maximum Pressure 
Pressure balancing implies CTV refuelling via differential pressure. This means the on-land
storage operating pressure is higher than the ship’s target pressure, allowing the gaseous fuel
to flow through the path of least resistance. A complication of this system is, however, the scale
of land-based storage necessary operating at a pressure of at least 500barg29. 
The second bunkering method implies compressing the hydrogen low pressure buffer storage to
the target ship pressure. For the purpose of this report, the working assumption is that high
pressure 350barg storage will be used, and therefore no compressors are needed. The working
assumption is that the ship target pressure is also 350barg, based on the design of a hydrogen
fuel cell ferry to be designed by ITM.
9.6 Footprint
Assuming ideal gas conditions, the volume required to store 1395kg of hydrogen is 49m3 or 25
HP storage tubes. Assuming hydrogen delivery times are going to be once a week the HP
storage must hold approximately 49m3 of hydrogen, i.e., 25 tubes will be needed. 
If grouped on a rack as in Figure 9.3 the tube storage rack would have an approximate area of
402m2. Consideration of extra storage for times of low productivity due to whether to be further
developed on.
A standard 18 tube hydrogen tube trailer has dimensions of 7.3m x 2.1m x 2.1m30.  Based on
this, the tube trailer unloading bay should allow enough space for safe access. To allow for this,
it is assumed the unloading bay will have dimensions of 8.3m x 3.1m or an area of 26m2. As the
required number of HP tubes is 25 and a standard tube trailer can load 18 an additional 7 HP
tubes must be provided. It is therefore assumed that two unloading bays will be necessary.
Should the facility expand in the foreseeable future, the addition of further 2 unloading bays
would imply a total area of 103m2. 
The dispensers are influenced by the ship movements, hose limits and connection point on ship
and type of connection (automatic or manual). For the scope of this study, the working
assumption is that two dispensers (1 for redundancy) will be manual and operating at 350barg.
The NEL hydrogen dispenser31 for automotive applications has dimensions of 0.5m x 0.7m x
2.5m however as the dispenser is not going to be automatic this can act as basis for the
bunkering study. Therefore, 2 dispensers would require 0.7m2. 
The estimated overall HRS footprint to include storage, unloading bays and dispensers and
allowance for expansion is approximately 506m2. 
29 Hyde, K., 2019 feasibility-of-hydrogen-bunkering-final-080419.pdf (northsearegion.eu)
30 Weldship, 2013 Standard Tube Trailers | Product Specifications | Weldship Corporation
31 NEL,2023), Hydrogen Dispenser | Nel Hydrogen
Page 94

Page 95

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 55 of 86
10 Conclusion  
10.1 Overview of Findings 
This report has completed an extensive appraisal on the feasibility of development of a
hydrogen hub in the Moray region to support a local hydrogen economy. A vast array of criteria
were engaged in this assessment, such traffic flows and patterns, stakeholder engagement and
proximity, as well as social outcomes including local community benefits.
Moreover, an investigation into necessary infrastructure and footprint requirements for a HRS
for both road and maritime end-users was conducted, in order to help pinpoint the location with
the highest potential for Moray’s first HRS. 
In terms of future hydrogen demand, the locations closer to higher traffic flows and high density
of whisky distilleries, such as Elgin or Aberlour have scored higher than the rest of the evaluated
possible sites. There is a strong desire to implement a hydrogen economy, since some transport
logistics companies, which count distilleries as clients, within Aberlour are investing in hydrogen
fuelled vehicles. Therefore, Elgin and Aberlour are two key strategic sites for a future hydrogen
hub based on foreseeable future demand. 
Another important factor considered in the site selection analysis is the available plot lands and
their proximity to utilities such as power, water and wastewater facilities. Although it scored the
highest in the quantitative assessment, the Elgin A491 Culzean Avenue site was subsequently
ruled out as it is not in line with the Moray Local Development Plan. The highest scoring site
considered viable is therefore the Elgin: A96 Travelodge Area. However, it is recommended that
alternative site options in line with the Moray Local Development Plan within Aberlour are
explored during the next stage and compared before any final decision is made on site
selection. 
Notwithstanding the factors above, the social outcome assessment has revealed that the high
need for socio-economic intervention in places such as Buckie, Aberlour and Keith could be
addressed by deploying pilot hydrogen, end-use or storage projects within the area. It is noted
that the highest levels of unemployment and deprivation were observed in Buckie and as such
the effects of a community benefit strategy would be favourable. 
Due to Buckie’s strategic location on the Scottish North-East coast, it has high potential to serve
as an HRS for crew transport vessels transferring technicians to nearby offshore windfarms for
maintenance and technical surveillance and so benefit from a maritime hydrogen refuelling
facility. However, from a purely traffic demand standpoint of view, Elgin and Aberlour provide
more advantageous prospects than Buckie. 
Therefore, Elgin and Aberlour should be considered as potential HRS location for road haulage
end-users and Buckie should be considered as potential HRS for maritime end-users. Further
stages of the project should consider the feasibility of a dual-purpose HRS for supporting fuel
transition of both transport means. 
To conclude, although not an exhaustive study on the qualitative and quantitative criteria set,
this report has provided greater context and detail on the matter of technical feasibility of a HRS
and ‘’hydrogen hub’’ development in Moray but also on how to retain the benefits of hydrogen
energy investment for the people and communities. 
Page 95

Page 96

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 56 of 86
11 Recommendations 
11.1 Next Steps 
11.1.1 Road & Maritime Hydrogen Refuelling 
There are several actions that can further analyse and highlight additional suitable sites for a
hydrogen refuelling facility in Moray. It is recommended to conduct:
● Additional stakeholder engagement to understand the land ownership of each site and the
process of obtaining this land. 
● Workshops with local potential users in Moray to understand their priorities for the location of
a refuelling site. This could also further identify where short-term demand for hydrogen
refuelling may be coming from. 
● Workshops with nearby offshore windfarms to pinpoint their priorities for CTV fleet fuel
transition and location for a refuelling site. This could also further identify where and how
much short-term demand for hydrogen refuelling may be coming from. 
● Site visits to identify any issues that could not be highlighted from satellite imagery and
desktop assessment.
● Economic assessment of each of the shortlisted sites. The quantitative assessment used in
this study only considered distances to possible utility connections and did not take in
account the cost of construction. This would provide an additional criterion to compare the
sites. 
● Continue to engage with suppliers to understand what each offer and the structure of each
agreement. This will also aid Moray’s council decision on their level of involvement during
operation. Some suppliers may offer different levels involvement, for example, a supplier
might wish to construct a hydrogen refuelling station, and provide the production,
transportation, and maintenance. 
● Further analysis on potential demand for maritime hydrogen in Buckie as it scored higher in
Social Value than any of the other locations. The social value analysis highlighted the
potential benefits to the area a project of this nature would have so this may be a missed
opportunity. 
● Qualitative and quantitative investigation of a dual end-user HRS at Buckie Harbour to
support the local fuel transition of both road and maritime applications. 
To support the council, maximise the leverage of a hydrogen economy in Moray, we
recommend: 
● Involving local communities and Stakeholder Engagement – Involve the wider community in
driving community benefits through robust collaborative stakeholder mapping and
engagement to fully understand the local needs, aspirations, and concerns to develop
community benefit interventions that support local residents. We note this is underway
through the Moray Hydrogen Stakeholder Network with several online and in-person events
having taken place. 
● Social Value and Community Benefit Policy and Strategy – Develop a social value and
community benefit policy and strategy for each location. This will enable the council to
effectively capture and integrate community benefits into the delivery of projects and
associated opportunities related to a hydrogen economy. Define clear and measurable
community benefit goals that align with council’s mission, values, and objectives.
Page 96

Page 97

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 57 of 86
● Develop Social Value and Community Benefit Action Plan – Develop a Social Value Action
Plan that includes targets and Key Performance Indicators (KPIs) aligned with community
local need. Refer to Table 6.4 for examples of potential initiatives and metrics for measuring
performance. Measure progress towards these targets on a regular basis, such as quarterly
or annually. This will help ensure that the initiatives are effectively contributing to social value
and achieving the desired outcomes. 
Page 97

Page 98

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 58 of 86
A. Stakeholder List 
Table A.1: List of Stakeholders Contacted as part of the Stakeholder Engagement
Exercise 
Organisation Industry/Sector
Baxters Food & Drink
Boeing Defence
Buckie Maltings Food & Drink
Caledonia Offshore Windfarm Energy (Renewables)
Carntyne Transport* Transport & Logistics
Emergency Services - Ambulance Service Emergency Services
Emergency Services - Fire Emergency Services
Emergency Services - Police Emergency Services
Forestry Scotland Forestry
Gleaner Oil & Gas Energy (Oil & Gas)
James Jones - Timber Forestry
Kinloss Barracks* Defence
McPherson's of Aberlour Transport & Logistics
Moray Council* Public Body (Local Authority)
NHS Grampian* Health
RAF Lossiemouth* Defence
Scottish Water* Utilities
Stagecoach North Scotland Transport & Logistics
The Forsyth Group* Transport & Logistics
Transport Scotland  Public Body (Transport Authority)
Walkers Shortbread Food & Drink
*Engaged with as part of the stakeholder engagement exercise 
Page 98

Page 99

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 59 of 86
B. Site Selection Prospects 
B.1 Elgin
The six site prospects in the Elgin location are depicted below. 
Figure B.1: Elgin Site Prospects 
Source: ArcGIS
B.1.1 Site 1: Ashgrove Road
The Ashgrove Road site is located in central Elgin. It was identified as it is a large plot of land
near the A96 and several industrial estates and therefore potential commercial users. The A96
is main travel route between Elgin and Aberdeen, as outlined Section 3. 
Figure B.2: Ashgrove Road Site 
Source: ArcGIS 
Page 99

Page 100

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 60 of 86
B.1.2 Site 2: A96 Travelodge Area
The A96 Travelodge site is located east of Elgin, off the final roundabout of the A96 before you
enter the town. There are several businesses making up a service style break area and a small
business park. There are multiple plots of land where a refuelling station could be built. 
Figure B.3: A96 Travelodge Site 
Source: ArcGIS
B.1.3 Site 3: A96 Industrial Area
Figure B.4: A96 Industrial Area Site 
Source: ArcGIS
Page 100

Page 101

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 61 of 86
Similarly, to the previous site, this prospect is located east of Elgin close the A96 as you enter
the town. It is a plot of land located on Riverside Road close to several businesses including car
dealerships and food outlets. 
B.1.4 Site 4: A941 adjacent to Culzean Avenue
This site is in south Elgin on the A941 as you enter the residential area, New Elgin. The site is a
large plot of land on the main road connecting Elgin to south Scotland. 
Figure B.5: A941 Culzean Avenue Site 
Source: ArcGIS 
B.1.5 Site 5: A941 adjacent to Linkwood Road
This prospect is located along the A941 although in central Elgin. This is a large plot of land with
several business and residential estates nearby, including Elgin Train Station.
Figure B.6: A941 Linkwood Road Site 
Source: ArcGIS 
Page 101

Page 102

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 62 of 86
B.1.6 Site 6: Boroughbriggs Road/North Street Carpark
This site was identified in a call with the council during a discussion regarding potentially
restructuring the carpark located in central Elgin. There are several commercial users nearby
and is close to the A96. 
Figure B.7: Elgin Boroughbriggs Road Carpark Site 
Source: ArcGIS
B.2 Lossiemouth 
The site prospect in the Lossiemouth location is depicted below. 
Figure B.8: Lossiemouth Site Prospects 
Source: ArcGIS
Page 102

Page 103

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 63 of 86
B.2.1 Site 7: RAF Lossiemouth
A potential location at RAF Lossiemouth (outside the wire) was also identified as there is likely
to be a plot of land available and the MoD understood to be planning to install 6 to 8 MW of
solar electricity generation at the site. There is the option to extend the size of the solar farm or
for MoD to allow part of the land to be used for a hydrogen refuelling station or pilot hydrogen
hub. Further discussion is required. 
Figure B.9: RAF Lossiemouth Site 
Source: ArcGIS
B.3 Aberlour 
The site prospects in the Aberlour location are depicted below. 
Figure B.10: Aberlour Site Prospects  
Source: ArcGIS
Page 103

Page 104

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 64 of 86
B.3.1 Site 8: A95 opposite Walker’s Head Office
This site is located north of Aberlour along the A95. Notably, it is opposite Walker’s shortbread’s
head office and factory. There are also several distilleries in the vicinity of Aberlour. 
Figure B.11: A95 Walker’s Site 
Source: ArcGIS
B.3.2 Site 9: A95 SW Aberlour
This site is a large plot of land southwest of Aberlour also along the A95. It was identified as and
additional option in Aberlour as several distilleries are close by. 
Figure B.12: A95 SW Aberlour Site 
Source: ArcGIS
Page 104

Page 105

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 65 of 86 
B.4 Blackhillock (Keith)
The site prospects in the Blackhillock Keith location are depicted below. 
Figure B.13: Keith Site Prospects 
Source: ArcGIS
B.4.1 Site 10: Blackhillock Substation
This site is located south of Keith near the Blackhillock substation. It was identified due to its
proximity to available utilities, as the Blackhillock substation if the largest substation in the UK
and is the connection point for the Beatrice and planned Moray West offshore wind farms. 
Figure B.14: Blackhillock Site 
Source: ArcGIS 
Page 105

Page 106

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 66 of 86
B.4.2 Site 11: A96 South Keith
This site was selected as it is an additional site located close to the Blackhillock substation.
However, this site is closer to Keith town centre and additionally it is located along the A96.  
Figure B.15: A96 South Keith Site 
Source: ArcGIS
B.5 Buckie Harbour 
The site prospects in the Buckie Harbour location are depicted below. 
Figure B.16: Buckie Site Prospects 
Source: ArcGIS   
Page 106

Page 107

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 67 of 86
B.5.1 Site 12: Buckie Harbour 1
This site the first of two locations identified at Buckie Harbour. This prospect is the largest open
plot of land near to the harbour businesses and jetties.  
Figure B.17: Buckie Harbour 1 Site 
Source: ArcGIS
B.5.2 Site 13: Buckie Harbour 2
This is the second potential site in Buckie Harbour. It is a small plot of land located west of the
harbour at the top of the A942.
Figure B.18: Buckie Harbour 2 Site 
Source: ArcGIS
B.5.3 Site 14: Buckie A942
This site is located south of Buckie along the A942, the main route into Buckie. It is a large plot
of land next to the Tesco Superstore and Petrol Station. 
Page 107

Page 108

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 68 of 86
Figure B.19: Buckie A942 Site 
Source: ArcGIS 
Page 108

Page 109

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 69 of 86
C. Elgin Location Profile 
C.1 Labour Market and Local Area
Elgin, the largest town, and commercial centre for Moray, has an estimated population of 23,582
(2023).32 In the 2011 census, 4% of the population was identified as unemployed, while 27.2%
were economically inactive. 33 Figures from 2022 show that the unemployment rate in Elgin has
increased to 6.49% (Dec 2022).34
Data from the 2011 census displayed that 33.3% of the population were employed in
managerial or professional occupations, lower than the Scottish average (37.8%) working within
these top 3 highest income occupation groupings. There was also a higher proportion of people
working in the lowest income grouping - ‘Elementary occupations’ – 13.8% compared to 12.8%
in Moray and 11.6% in Scotland. However, the third highest income group ‘Associate
Professional and Technical occupations’ employed 14.9% of people in Elgin compared to Moray
(14.7%) and Scotland (12.6%), 35
As outlined in Figure C.20 the level of deprivation is varied across Elgin. In the Scottish Index of
Multiple Deprivation 2020, which measures income, employment, health, education and skills,
housing, geographic access and crime, large parts of West Elgin were ranked as having little or
no deprivation, scoring well in income, employment, education, health, and housing. Three
areas in Elgin (in dark blue) were part of the least deprived 10% of data zones.
In comparison, 3 areas in Elgin East were ranked in the 20% most deprived data zones in
Scotland. Heldon West, Fogwatt to Inchberry was ranked number 560 of Scottish data zones (1
being most deprived) making it part of the most deprived 10% of Scotland. New Elgin East,
ranked number 1298, and Elgin Cathedral to Ashgrove and Pinefield, ranked number 1067,
were positioned in the most deprived 20%. These 3 areas scored poorly in education/skills,
income, employment, and health.36
As a result of such statistics, the Moray Community Partnership have identified New Elgin East
as an area to focus the improvement of outcomes in factors including employment, crime, and
education in the Local Outcomes Improvement Plan V.2 (released in Sept 2021).37 
32 Elgin Population 2023 (worldpopulationreview.com)
33 Area Profile 2017 - ELGIN, CENTRAL WEST v4 (yourmoray.org.uk)
34 Elgin, IL Unemployment Rate (ycharts.com)
35 Area Profile 2017 - ELGIN, CENTRAL WEST v4 (yourmoray.org.uk)
36 SIMD (Scottish Index of Multiple Deprivation)
37 Local Outcomes Improvement Plan Sept 2021, LOIP (yourmoray.org.uk)
Page 109

Page 110

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 70 of 86
Figure C.20:  Map outlining levels of deprivation in Elgin 
Source: Scottish Index of Multiple Deprivation38
C.2 Skills and Training 
Elgin has a total of 8 primary schools, 2 secondary schools and 1 college, UHI Moray – the only
further education college in Moray. In the 2011 census, 26.6% of Elgin’s population (aged 16
and over) reported having no qualifications, slightly lower than the proportion in Moray (26.7%)
and Scotland (26.8%). 27.4% of Elgin’s population reported a standard grade or equivalent as
their highest qualification attained and 14.6% a higher grade or equivalent. However, there was
a lower rate of people who attained a degree or higher degree (20.9%) compared to Moray
(22.7%) and Scotland (26.1%).  Although Elgin reported a higher proportion of people in skilled
trades occupations (14.4%) compared to Scotland (12.5%), this was lower than the Moray
average of 16.6%.39
C.3 Local Economy
As displayed in the 2011 census, the industry with the highest level of employment is wholesale
and retail trade and motor repairs (17.6%). Health and social work are the second largest
employer by industry (13.7%), followed by public administration and defence (12.6%).40 The
high proportion of workers in public administration and defence can be attributed to the
proximity of RAF Lossiemouth to the town. 
A significant proportion of people in Elgin are also employed in the manufacturing industry
(11.8%) compared to Scotland (8%), however this is lower than the proportion of people
employed in manufacturing in wider Moray (12.1%). Elgin is a key manufacturing site for
consumer products - Elgin is the main site of textile manufacturers Johnstons of Elgin, the UK’s
largest producer of luxury cashmere and fine woollens. Whisky is also an important component 
38 SIMD (Scottish Index of Multiple Deprivation)
39 Area Profile 2017 - ELGIN, CENTRAL WEST v4 (yourmoray.org.uk)
40 Area Profile 2017 - ELGIN, CENTRAL WEST v4 (yourmoray.org.uk)
Page 110

Page 111

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 71 of 86
of the wider local economy with Glen Moray distillery, Miltonduff distillery and BenRiach distillery
all within 6 miles of Elgin.
The creation of a cultural quarter in Elgin forms a key strategic project in Moray’s economic
strategy 2022-2032. The cultural quarter aims to support economic growth and cultural
expansion by creating a heritage attraction, rebranding of the town hall, and the provision of a
new hotel. The increased activity driven by this will provide greater opportunities for small
businesses and social enterprises, while attracting further tourism to the area. 
C.4 Health and Wellbeing 
Elgin has a range of green spaces and community facilities that can help support positive health
and wellbeing for local communities. There is an estimated 31 hectares of greenspace per 1000
people, significantly higher than the national average of 24 hectares of greenspace in urban
areas. 41Green spaces include 14 parks, gardens, and playing fields like Cooper Park, which
have community facilities such as a tennis court and bowling green. Elgin also has a Sports and
Community Centre. 
In the 2011 census, 85% of Elgin’s population stated that their health was either ‘very good’ or
‘good’, while 17.2% considered themselves limited by a long-term health condition or disability.
In the 2011 census, 3.8% of Elgin residents reported having a mental health condition. Rates of
depression significantly increased in Elgin between 2013/2014 and 2015/2016, increasing by
2.9% to 5.4 per 100 patients.42 Although rates of depression from the 2011 census were lower
in Elgin compared to Moray (5.8) and Scotland (6.8), rates increased at a faster rate compared
to Moray (1.6%) and Scotland (1.0%).43
When comparing health statistics across Elgin, New Elgin East scored poorly compared to other
areas in Elgin and the rest of Scotland. 
41 The Second State of Scotland's Greenspace Report - greenspace scotland - Jan 2012.pdf (nature.scot)
42 Area Profile 2017 - ELGIN, CENTRAL WEST v4 (yourmoray.org.uk)
43 Area Profile 2017 - ELGIN, CENTRAL WEST v4 (yourmoray.org.uk)
Page 111

Page 112

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 72 of 86
D. Lossiemouth Location Profile 
D.1 Labour Market and Local Area
Lossiemouth has an estimated population of 6,873.44 The last figures published regarding
unemployment in Lossiemouth were in the 2011 national census, where 4.3% of the population
were identified as unemployed. 45 
In the 2011 census, 43.6% of people reported working in managerial or professional
occupations, higher than other site areas in Moray, and the Scottish average. 29% of people
employed in Lossiemouth, reported working in the ‘Associate Professional and Technical’
occupations grouping, nearly double the rate of Moray (14.7%). This also formed the largest
occupation grouping in Lossiemouth, followed by ‘Skilled trades occupations’ – 12.8%. 46
Significant members of these skilled occupations are expected to be working within technical
roles in the RAF Lossiemouth base, which employs an estimated 3,500 employees (further
detail in Section 3). The Local Outcomes Improvement Plan V2, has identified that the
population of Lossiemouth is expected to grow over the next 10 years with the potential for an
additional 3,000 to 4,000 military personnel and their families relocating to Lossiemouth, driving
up employment figures in the defence sector and professional technical occupation groups.47
The Scottish Index of Multiple Deprivation 2020 highlighted that most areas in Lossiemouth
were in 50% of the least deprived data zones in Scotland. Two areas in Lossiemouth (in dark
blue, in Figure D.21 ) were part of the least deprived 10% of data zones in Scotland, ranking in
the 8th to 10th decile for income, employment and health deprivation. 
44 Lossiemouth - Wikipedia
45 Area Profile 2016 - LOSSIEMOUTH - Draft2 (yourmoray.org.uk)
46 Area Profile 2016 - LOSSIEMOUTH - Draft2 (yourmoray.org.uk)
47 LOIP (yourmoray.org.uk)
Page 112

Page 113

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 73 of 86
Figure D.21: Map outlining levels of deprivation in Lossiemouth 
Source: Scottish Index of Multiple Deprivation 48
D.2 Skills and Training
There are 2 primary schools, and one secondary school in Lossiemouth. In the 2011 census,
21.9% of Lossiemouth’s population (aged 16 and over) reported having no qualifications,
significantly lower than Moray (26.7%) and Scotland (26.8%). 27.3% reported a standard grade
or equivalent as their highest qualification attained, and 17.9% a higher grade or equivalent.
21.5% reported attaining a degree or higher degree, lower than the average rate in Moray
(22.7%) and significantly lower than the Scotland average (26.1%).49  
Compared to the Scottish average (12.5%), Lossiemouth has a similar proportion of people
working in skilled trades (12.8%). RAF Lossiemouth also provides significant opportunities for
training and skill development in the defence sector. In September 2020, there were 223 active
apprenticeships in engineering and survival equipment at the base. Recent investment in March
2023 will also create 7 new trainee positions in engineering and construction. 50
D.3 Local Economy 
The industry with the highest level of employment in Lossiemouth by far is public administration
and defence; compulsory social security (employing 30.7% of the local population in 2011)
driven by the presence of the RAF base in Lossiemouth.51 The local economy of Lossiemouth is
heavily dependent on the RAF. In a 2010 appraisal, the RAF station in Lossiemouth employed
3,370 full-time employees, equal to around 11% of jobs in Moray’s economy. In early 2022,
there were around 3,500 jobs based at the site.52 RAF Lossiemouth is continuing to grow which 
48 SIMD (Scottish Index of Multiple Deprivation)
49 Area Profile 2016 - LOSSIEMOUTH - Draft2 (yourmoray.org.uk)
50 £83 million investment at RAF Lossiemouth creates more than 100 UK jobs - GOV.UK (www.gov.uk)
51 Area Profile 2016 - LOSSIEMOUTH - Draft2 (yourmoray.org.uk)
52 Microsoft Word - RAF EIA Exec Summary (Aug 10)[1].doc (hie.co.uk)
Page 113

Page 114

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 74 of 86
will further increase the number of employees employed in public administration and defence. In
March 2023, the base secured a £83 million investment from the UK government to build a new
facility, which has created more than 125 local jobs, and increased opportunities for involvement
from the local supply chain.53
The second and third industry with the highest level of employment as identified in the 2011
census is Human health and social work activities (11.9%), and Wholesale and retail trade;
repair of motor vehicles and motorcycles (11.8%).54
D.4 Health and Wellbeing 
There is an estimated 44 hectares of greenspace per 1000 people, including 2 parks – Station
Park Lossiemouth, Coulardbank Park Lossiemouth. This is significantly higher than the average
for Scottish urban areas (24 hectares per 1000 people). There is also a sports and community
centre in the town. Lossiemouth is on the Moray coast so has several beaches available to the
local community. The range of outdoor spaces available to the community for recreation
activities is likely to have a positive impact on community health and wellbeing. This is reflected
in data from the 2011 census where 86.1% of Lossiemouth’s population stated that their health
was either ‘very good’ or ‘good’, while 16.1% considered themselves limited by a long-term
health condition or a disability – more positive statistics compared to the other sites. This is also
supported by mental health statistics, with 3% of the population reporting a mental health
condition compared to the Scottish average of 4%. 55 
53 £83 million investment at RAF Lossiemouth creates more than 100 UK jobs - GOV.UK (www.gov.uk)
54 Area Profile 2016 - LOSSIEMOUTH - Draft2 (yourmoray.org.uk) 
55 Area Profile 2016 - LOSSIEMOUTH - Draft2 (yourmoray.org.uk)
Page 114

Page 115

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 75 of 86
E. Aberlour Location Profile 
E.1 Labour Market and Local Area
Charlestown of Aberlour (Aberlour), has an estimated population of 1,020.56 The last figures
published regarding unemployment in Aberlour was in the 2011 national census, where 2.3% of
the population was identified as unemployed. 
Based on data from the 2011 census, 31.9% of the population in Aberlour reported working in
the managerial and professional occupation groupings, a significant figure for a town with a
working age population of 423. In the Scottish Index of Multiple Deprivation 2020, all areas in
the town were ranked in the least deprived 30 and 40% of data zones in Scotland. 
Figure E.1. Map outlining levels of deprivation in Aberlour 
Source: Scottish Index of Multiple Deprivation57
E.2 Skills and Training 
The town has 1 primary school and 1 secondary school. In the 2011 census, 35.7% of
Aberlour’s population (aged 16 and over) were ranked as having no qualifications, 23.5% have
a standard grade or equivalent, 11.6% a higher grade or equivalent. and 21.8% a degree or
higher degree. The higher proportion of people with a degree or higher degree qualification is
consistent with the occupational spread, which has a high proportion of people in managerial
and professional occupations, as reflected in Section 3. However, compared to the rest of
Moray and Scotland, Aberlour has a lower proportion of 16–17-year-olds in education. 16.3% of
Aberlour’s population also reported working in skilled trades occupations.58 
56 Aberlour (Moray, Scotland, United Kingdom) - Population Statistics, Charts, Map, Location, Weather and Web
Information (citypopulation.de)
57 SIMD (Scottish Index of Multiple Deprivation)
58 Finalised Area Profile 2015 - ABERLOUR (yourmoray.org.uk)
Page 115

Page 116

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 76 of 86
E.3 Local Economy 
The industry with the highest level of employment was manufacturing (35%), with the food
manufacturers Walkers and the whisky distilleries employing the bulk of employees in this
industry.59 Human health and social work activities followed this (11.1%), and wholesale and
retail trade (9.2%).
E.4 Health and Wellbeing 
There is one park in Aberlour – Alice Littler Park – which has a putting green and some tea
rooms for community use. There are also a range of community facilities including Speyside
Community Centre, a rollerblade park, youth club, and Fleming Hall – which hosts a range of
community activities and classes.
Data from the 2011 census suggest that there are significant health issues in Aberlour. 81.5% of
the population stated that their health was ‘very good’ or ‘good’, while 32.4% of the population
considered themselves limited by a disability or long-term health condition – well above the rate
of the other 4 towns. The most defined conditions reported were deafness or partial hearing loss
(9.7%), followed by physical disability (9.3%) and mental health conditions (3%). While higher
than the Scottish baseline, the obesity rate in Aberlour is consistent with the rates across the
other site areas (10.26 per 100 patients).60 
59 Finalised Area Profile 2015 - ABERLOUR (yourmoray.org.uk)
60 Finalised Area Profile 2015 - ABERLOUR (yourmoray.org.uk)
Page 116

Page 117

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 77 of 86
F. Blackhillock (Keith) Location Profile 
F.1 Labour Market and Local Area
Keith, the closest town to Blackhillock has an estimated population of 4,570.61 The latest
published figures published regarding unemployment in Keith were in the 2011 national census,
where 3.4% of the population was identified as unemployed.62
The spread of occupations in Keith’s labour market displays some similarities with that of
Buckie. In the 2011 census, Keith reported a lower proportion of people working in the top 3
highest paying occupation groups (managerial and professional occupations) – 20.6%, and a
higher proportion of people working in elementary occupations (15.5%) compared to Moray and
Scotland. 
Like Buckie, skilled labour in Keith is particularly high with 20.3% of people working in skilled
trades occupations compared to 12.5% in Scotland. In the Scottish Index of Multiple Deprivation
2020, Southern Keith had a higher level of deprivation with Southeast Keith being ranked
number 1921 of deprived data zones – forming part of the most deprived 30% of Scotland data
zones. The measures impacting this including high crime and poor education/skills.
Figure F.22: Map outlining levels of deprivation in Keith 
Source: Scottish Index of Multiple Deprivation63 
61 Keith (Moray, Scotland, United Kingdom) - Population Statistics, Charts, Map, Location, Weather and Web
Information (citypopulation.de)
62 FINALISED - KEITH (yourmoray.org.uk)
63 SIMD (Scottish Index of Multiple Deprivation)
Page 117

Page 118

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 78 of 86
F.2 Skills and Training 
Keith has 2 primary schools and 1 secondary school. In the 2011 census, 37.2% of Keith’s
population (aged 16 and over) were reported as having no qualifications, 28.1% have a
standard grade or equivalent, 13.2% a higher grade or equivalent. and 14.2% a degree or
higher degree. Compared to the rest of Moray and Scotland, Keith has a much higher proportion
of households where no one holds a national level qualification above level 2 (SCE Higher or
similar).64 However as identified in Section 6.5 there are a large proportion of people who work
in skilled trade work which is unlikely to require formal educational training but on the job
training and development.
F.3 Local Economy 
In the 2011 census, the industry with the highest level of employment was wholesale and retail
trade, motor repairs (19.3%), followed by manufacturing (17.7%), and construction (13.2%).
There is a builders’ merchant in Keith; however, previous reports have suggested that majority
of those employed in the construction sector here are likely to be working for large Elgin-based
building companies such as Robertson Group or Springfield. The major manufacturers in Keith
are the 4 whisky distilleries located there.65
F.4 Health and Wellbeing 
Keith has a high proportion of green spaces (37 hectares per 1000 people) compared to most of
the site areas – beaten only by Lossiemouth. There are 4 parks in Keith, some with community
facilities including football and cricket pitches, and tennis courts. In the 2011 census, 82.4% of
the population stated that their health was ‘very good’ or ‘good’ while 20% of the population
considered themselves limited by a disability or long-term health condition. Furthermore, 3.6%
of the population reported a mental health condition.66
F.5 Energy Masterplan
The new Energy Masterplan for the Keith/Blackhillock area is being developed by Moray
Council. Consideration should be given to hydrogen as part of the masterplan. As part of Phase
2 of the Moray Hydrogen Strategy, a meeting was held with the Moray Council team developing
the masterplan to provide an overview of the strategy and what would need to be considered for
a hydrogen hub or hydrogen refuelling station to assist in informing the masterplan. 
64 FINALISED - KEITH (yourmoray.org.uk)
65 FINALISED - KEITH (yourmoray.org.uk)
66 FINALISED - KEITH (yourmoray.org.uk)
Page 118

Page 119

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 79 of 86
G. Buckie Harbour Location Profile 
G.1 Labour Market and Local Area
Buckie has an estimated population of 8,541.67 The latest published figures published regarding
unemployment in Buckie was in the 2011 national census, where 9.7% of the population were
identified as unemployed. 68
Results from the 2011 census displayed that there are significantly lower proportions (21%) of
people working in the top 3 highest paying occupation groups (managerial and professional
occupations) compared to Moray (33.7%) and Scotland (37.8%). There are also more low skill
jobs in Buckie with 14.8% of the employed population working in elementary occupations,
compared to 12.8% in Moray and 11.6% in Scotland. 
Buckie however has a higher proportion of people working in skilled trades occupations (18.7%)
– the largest occupation group – compared to Moray (16.6%) and Scotland (12.5%). It also has
a significantly higher proportion of process, plant, and machine operatives (16.8%) against
Moray (10.4%) and Scotland (7.7%). These occupation groups could be effectively upskilled to
deploy their skills for utilisation in a hydrogen economy.69
In the Scottish Index of Multiple Deprivation 2020, central Buckie was identified as having lower
levels of deprivation compared with East and West Buckie. An area in Buckie Central East was
ranked number 1852nd of most deprived – putting it within the 30% most deprived data zones in
Scotland, particularly in terms of income, education, and employment deprivation.70 
67 Layout 1 (moray.gov.uk)
68 buckieplusprofileplus2014.pdf (hie.co.uk)
69 Area Profile 2016 - Buckie-Draft (yourmoray.org.uk)
70 SIMD (Scottish Index of Multiple Deprivation)
Page 119

Page 120

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 80 of 86
Figure G.23: Map outlining levels of deprivation in Buckie 
Source: Scottish Index of Multiple Deprivation71 
Due to the high level of deprivation identified here, the Moray Community Partnership have
identified Buckie Central East as an area to improve outcomes around ‘building a better future
for our children and young people in Moray’ as part of Moray’s 10 Year Plan, particularly
focusing on attainment, increased employability, and a greater voice in community affairs. 72 
G.2 Skills and Training 
There are 3 primary schools and 1 secondary school in Buckie (Buckie High School). In the
2011 census, 34% of Buckie’s population (aged 16 and over) reported having no qualifications,
28.9% have a standard grade or equivalent as their highest qualification, 13% a higher grade or
equivalent. and 15.4% a degree or higher degree.73 
Through community engagement as part of the Local Outcome Improvement Plan for Buckie
Central East, students at Buckie High School were concerned about teacher and subject
availability. This reflects results from engagement with the wider community where only 55% of
respondents said they were able to take the subjects they wanted to at school, while 65% said
they needed more support at school.74This suggests that opportunities to better enhance
education and skills for some Buckie students are lacking.
As part of Buckie’s local development plans, council has identified an area to the southwest of
Buckie as a long-term growth area. This area will include community facilities and be the
potential location for a new school campus, increasing venues for advancing skills and training
for young people in Buckie.75 
71 SIMD (Scottish Index of Multiple Deprivation)
72 Local Outcomes Improvement Plan Sept 2021, LOIP (yourmoray.org.uk)
73 buckieplusprofileplus2014.pdf (hie.co.uk)
74 file128000.pdf (yourmoray.org.uk)
75 Layout 1 (moray.gov.uk)
Page 120

Page 121

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 81 of 86
G.3 Local Economy
In the 2011 census, the industry with the highest level of employment was wholesale and retail
trade, motor repairs (15.7%) followed by manufacturing (14%) and Human health and social
work activities (12.3%).76 Compared to the rest of Scotland and the Highlands and Islands,
Buckie has a higher share of employment in mining, quarrying, utilities, and manufacturing
(9.6%). This is driven up by the impact of the oil and gas industry, with oil and gas companies
Regency Oils, Aztec Oils Northern, and Forsyths located in the local area. 
In the Local Outcome Improvement Plan for Buckie Central East – an initiative of Moray’s
Community Planning Partnership, several barriers to employment were identified through
engagement with local communities. These were: limited transport options, childcare, lack of
skills, and mental health. As part of this, respondents identified employment as a concern with
many saying that there is a lack of well-paid jobs in Buckie, and a lack of transport options limits
people from finding employment, accessing training opportunities, and reaching other essential
opportunities.77
Some of these existing challenges are highlighted within the Buckie Harbour Masterplan that
sets out the objective to boost local business and economic growth that supports inward
investment to create a more economically vibrant community across Buckie through inclusive
redevelopment.78
G.4 Health and Wellbeing
There is an estimated 29 hectares of greenspace per 1000 population, including 3 local parks
with community facilities including a football pitch and pavilion. Although higher than the
average in Scottish urban areas (24 hectares), this is significantly lower when compared to Elgin
and Lossiemouth, limiting community outlets for recreation. The Moray Council has plans to
increase greenspace in Buckie through its local development plans, which aims to ‘protect and
enhance the existing network of open and green spaces’, and ‘identify a network of new play
areas and parks’.
In the 2011 census, 83.6% of the population stated that their health was ‘very good’ or ‘good’
while 19.4% of the population considered themselves limited by a disability or long-term health
condition.79Only 3% of the population reported having a mental health condition, the joint lowest
with Lossiemouth compared to the other site areas. While higher than the Scottish baseline, the
obesity rate in Buckie is consistent with the rates across the other site areas. 
In the Local Outcome Improvement Plan for Buckie Central East, although 86% of people in the
local community were interested in what goes on in their community, only a quarter felt like they
had a voice.80Limited perception of impact on wider community affairs could potentially have an
impact on wellbeing through the decreased sense of community impact and belonging. 
76 Area Profile 2016 - Buckie-Draft (yourmoray.org.uk)
77 file128000.pdf (yourmoray.org.uk)
78 http://www.moray.gov.uk/downloads/file98784.pdf
79 Area Profile 2016 - Buckie-Draft (yourmoray.org.uk)
80 file128000.pdf (yourmoray.org.uk)
Page 121

Page 122

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 82 of 86
H. Community Development Funds
There have been 2 community support funds in the UK developed in collaboration with plans to
create Hydrogen Villages/Communities in Whitby and Redcar. Further examples of community
development funds from renewable energy projects are also included below to serve as an
example of the type of support a hydrogen related fund could provide to communities.
Table H.1: Community Development Funds
Fund Provider Description Focus
1 Redcar Hydrogen
Community
Northern Gas
Networks
Provides financial support
(between £500 - £5,000)
to projects and
community groups in the
Redcar area. £20,000
was allocated to the Fund
in 2022.
Open to projects that address issues
related to individual finances,
homelessness, unemployment, local
social issues, local environment,
community spaces, support to physically
impaired, mental health, education, and
training.
2 Hydrogen Village
Cadent Gas
developed in
collaboration
with Cheshire
West Voluntary
Action (CWVA)
Provides financial support
(up to £2,000) to
initiatives that make a
positive difference to
communities in Whitby
and surrounding areas.
£20,000 was allocated to
the fund in 2022.
Open to existing services or activities,
and new projects that align with tackling
the climate emergency, growing the local
economy and new jobs, supporting
young people, enabling adults to live
longer happier lives.
3 Gordonbush
Community Fund SSE
Provides financial support
to community and
charitable projects
supported by community
groups, not for profits,
and charities in Brora,
Golspie, Helmsdale, and
Rogart Council areas.
£200,000 available per
year.
Open to projects that support charitable
activities that develop an area’s assets or
build the sustainability of local areas.
4
Binn Wind
Turbine
Community Fund
Our Community
Energy (OCE)
by Green Cat
Renewables
Provides financial support
to community projects in
selected areas in Perth,
Kinross, and Fife.
Accepts grant
applications up to
£20,000.
Open to projects that enhance local
communities by promoting safe, cohesive
communities, developing community
assets, reducing inequalities, and
supporting health and wellbeing. 
Page 122

Page 123

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 83 of 86
I. Latest Hydrogen Research 
Several Scottish universities are currently undertaking research about hydrogen, to support the
development of potential initiatives and rollout of a hydrogen economy, council may seek to
develop partnerships with key institutions to help shape the rollout or ongoing development of
Moray’s Hydrogen Economy. 
Table I.1: Scottish University-led Research  
University Research Focus
1 University of Strathclyde
The Energy Systems Research Unit at Strathclyde is involved in
research related to hydrogen production, storage, and transportation,
as well as the development of fuel cell technologies. The university is
also home to the UK's first Hydrogen Safety Engineering and
Research Centre, which aims to improve safety standards in the
hydrogen industry.
2 University of Edinburgh
The University of Edinburgh's School of Chemistry is involved in
research related to the production of hydrogen from renewable
sources, such as solar and wind power. The university is also
involved in research related to the development of fuel cell
technologies for use in transport and other applications.
3 Heriot-Watt University
Heriot-Watt University is involved in research related to the
production of hydrogen from renewable sources, as well as the
development of hydrogen storage technologies. The university is also
involved in research related to the use of hydrogen in fuel cell
vehicles and is working to develop new materials for use in fuel cell
membranes.
4 University of Glasgow
The University of Glasgow's School of Chemistry is involved in
research related to the production of hydrogen from water using
renewable energy sources. The university is also involved in research
related to the use of hydrogen as a fuel in transport and other
applications and is working to develop new catalysts for use in fuel
cells.
5 Robert Gordon University
Robert Gordon University is involved in research related to the use of
hydrogen in the oil and gas industry, as well as the development of
hydrogen storage technologies. The university is also involved in
research related to the use of hydrogen in transport and is working to
develop new fuel cell technologies for use in cars and buses. 
Page 123

Page 124

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 84 of 86
J. Subsidies and Funding 
Across Scotland and more widely the UK, there are several subsidies and grant funding Moray
Council could consider exploring further to support the ongoing development of a hydrogen
economy. 
Table J.1: Subsidies and Funding Options
Funding Scheme Provider Description Application Criteria
1
Hydrogen for
Transport
Programme
UK
Government
The Hydrogen for Transport
Programme provides funding
for zero-emission fuel cell
electric vehicles (FCEVs) and
refuelling infrastructure.
The funding is available to public and
private sector organisations that are
in England, Scotland, or Wales. The
scheme is primarily aimed at fleet
operators, vehicle manufacturers, and
infrastructure providers.
2 Low Emission Bus
Scheme
UK
Government
The Low Emission Bus
Scheme provides funding to
help local authorities and bus
operators switch to low or
zero-emission buses.
The funding is available to local
authorities, bus operators and other
public transport providers in England,
Scotland, and Wales. The scheme is
designed to support the purchase of
low or zero-emission buses and
infrastructure to support them.
3
Zero Emission
Fleet Accelerator
(ZEFA)
UK
Government
ZEFA provides funding for
the deployment of zero-
emission vehicles and
infrastructure in the UK.
The funding is available to public and
private sector organisations, including
fleet operators and infrastructure
providers. The scheme aims to
support the uptake of zero-emission
vehicles in fleets across the UK.
4 Green Distilleries
Competition
Scottish
Government
The Green Distilleries
Competition is a funding
scheme that aims to support
the decarbonisation of the
whisky and gin sectors in
Scotland.
The funding is available to Scottish
distilleries that are looking to
decarbonise their operations by using
hydrogen and other low-carbon
technologies. The scheme aims to
support the development and
5deployment of new technologies and
infrastructure.
5
Industrial Fuel
Switching
Competition
UK
Government
The Industrial Fuel Switching
Competition is a funding
scheme that aims to support
the decarbonisation of
industry in the UK.
The funding is available to UK-based
industrial companies that are looking
to switch from fossil fuels to low-
carbon alternatives, such as
hydrogen. The scheme aims to
support the development and
deployment of new technologies and
infrastructure.
6
Scottish Zero
Emission Bus
Challenge Fund
Transport
Scotland 
The Scottish Zero Emission
Bus Challenge Fund provides
funding for the purchase of
zero-emission buses and
infrastructure in Scotland.
The funding is available to Scottish
local authorities, bus operators, and
other public transport providers. The
scheme aims to support the transition
to zero-emission buses across
Scotland.
7 Energy Investment
Fund
Scottish
Government 
The Energy Investment Fund
(EIF) provides funding for
innovative energy projects in
Scotland, including those
involving hydrogen.
The funding is available to Scottish
businesses, communities, public
sector organisations and third sector
organisations. The scheme aims to
support the development and
deployment of innovative energy
projects that will help to drive
Scotland's transition to a low carbon
economy.
Page 124

Page 125

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 85 of 86
Funding Scheme Provider Description Application Criteria
8
Low Carbon
Infrastructure
Transition
Programme
Scottish
Government
The Low Carbon
Infrastructure Transition
Programme (LCITP) provides
funding for low carbon
infrastructure projects in
Scotland, including those
involving hydrogen.
The funding is available to Scottish
businesses, communities, public
sector organisations and third sector
organisations. The scheme aims to
support the development and
deployment of low carbon
infrastructure projects that will help to
reduce Scotland's greenhouse gas
emissions.
9
Community and
Renewable
Energy Scheme
Local Energy
Scotland 
The Community and
Renewable Energy Scheme
(CARES) provides funding for
community-led renewable
energy projects in Scotland,
including those involving
hydrogen.
The funding is available to Scottish
communities, public sector
organisations and third sector
organisations. The scheme aims to
support the development and
deployment of community-led
renewable energy projects that will
help to reduce Scotland's greenhouse
gas emissions and support local
economic development. 
Page 125

Page 126

Mott MacDonald | Confidential | Moray Hydrogen Strategy  
Phase 2 Report 
December 2023 
Page 86 of 86       
mottmac.com 
Page 126

Page 127

Documentation: MHS – Moray Hydrogen Strategy 
P2S – Moray Hydrogen Strategy Phase 2 Scoping 
FSS – Fuel Switching Strategy 
Action Document Status/Targets History Delivery
Lead
1.1 Consider how Moray Council wish to take forward the
development of a Hydrogen Economy within Moray
MHS On hold At present there are a lack of resources and expertise for creating an
arms-length company. Rather the role should be one of a supporting
facilitator of development by others. This could be revisited if
circumstances indicate that an arms-length company would be required.
TMC
1.2 Continue to develop enhanced relationships with key
partners and adjacent Councils. Establish a hydrogen
steering group
MHS Ongoing Steering group established with HIE, UHI Moray, Hydrogen experts,
renewable energy developers, Moray Council.
Links made with Aberdeen City Council and businesses in Aberdeen
TMC
1.3 Establish a hydrogen stakeholder network in Moray MHS Ongoing Online network established including community and education groups as
well as industry. Online events have been held and a two-day event in
Elgin
Hydrogen
Steering
Group
1.4 Investigate funding opportunities MHS Ongoing Funding for 2022-24 from Just Transition Fund successful. This is to create
a Phase 2 scoping report and Moray Council Fuel Switching Strategy.
Report on Just Transition Fund spending and future project opportunities
to be reported to Council summer 2024
TMC
1.5 Promotion and knowledge development of Hydrogen
within schools and through Moray. Create web
resources, bring in additional resources to maximise
funding opportunities, economic activity and
investment
MHS On hold On hold until resources allow this action to progress. TMC
1.6 PILOT: Hydrogen vehicles in Moray Council Fleet.
Possibly involving both hydrogen fuel cell and dual fuel
(H2ICE) vehicles service. This would require hydrogen
to be produced outwith Moray for refuelling at TMC
depot. Pilot would include training and converting
appropriate depot facilities.
FSS Pilot vehicles
from 2025 when
resources,
funding, and
vehicle availability
allow the project
to proceed.
Fleet Hydrogen Fuel Switching Strategy to be integrated into Fleet
Decarbonization Strategy and progressed when staff resources allow.
TMC
1.7 PILOT: Engage with industry to support the roll out of
refuelling facilities in Moray. This could involve the
creation of hydrogen hubs which would produce and
distribute hydrogen.
P2S
MHS
From 2027
onwards
Phase 2 scoping document created showing analysis of HGV movements
and projected potential demand for hydrogen for vehicles and maritime
vessels. Potential sites for a refuelling hub were analysed.
The document aims to promote opportunities for developer involvement.
The desirability of having production and distribution hubs will decrease if
TMC
Item 7
Page 127

Page 128

Documentation: MHS – Moray Hydrogen Strategy 
P2S – Moray Hydrogen Strategy Phase 2 Scoping 
FSS – Fuel Switching Strategy
large scale production of hydrogen is developed in Moray – this would
mean the sites would only be required to distribute hydrogen 
Aims: By early in medium term, there should be an aim to have developed a network of hydrogen refuelling stations. This will allow new HGVs and large-vehicle fleets to be
hydrogen fuelled. For industry, the supply will need to be in place and proven to allow the financial commitment of a complete switch to hydrogen vehicles to occur. The
significant increase in demand occurs during the medium term and there is the opportunity to utilise offshore wind power (e.g. Caledonia Wind Farm) to expand hydrogen
production based on offshore wind power.
In addition, it is the current SGN policy that the SGN gas network will be repurposed during this timeframe to provide heating for homes using hydrogen with delivery by
pipeline. Therefore, towards the end of 2030s, there is a strong likelihood for hydrogen to be used for domestic heat alongside other energy sources. 
Aims:  In this period, there should be consolidation of the hydrogen production facilities within Moray and identification of opportunities for the further expansion and
growth of the hydrogen economy in Moray.
From 2040 onwards as technologies improve and bring down costs, there is the potential for the development of smaller scale community projects (particularly for areas
that are “offgrid”). As well as allowing energy to be created and used at source, it creates increased resilience within the energy network and offers the opportunity for
communities to be self-sustaining. 
Page 128

Page 129

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 6 FEBRUARY 2024 
SUBJECT: ELGIN BUSINESS IMPROVEMENT DISTRICT – RENEWAL
BALLOT 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To seek the Committee’s approval to support the re-ballot for the Elgin
Business Improvement District (BID) 
1.2 This report is submitted to Committee in terms of Section III (F) (2, 3, 4, and
28) of the Council's Scheme of Administration relating to exercising the
statutory functions of the Council in relation to economic development,
commercial development, assistance to business and tourism development. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee agrees to: 
i) continue the support of the Elgin BID through undertaking the re-
ballot; and 
ii) note a further report will be presented to Committee with full
business plan details including the levy and any potential future
financial implications for the Council. 
3. BACKGROUND 
3.1 A Business Improvement District (BID) is a business led initiative where
businesses come together to provide additional services and initiatives which
will improve the trading environment and benefit the local economy within a
defined geographical area. 
3.2 BIDs came into force in Scotland in 2007 as a result of primary legislation in
Part 9 of the Planning etc. (Scotland) Act 2006 and other secondary
legislation.  This included UK parliamentary regulations needed to implement
reserved aspects of the policy.
Item 8
Page 129

Page 130

3.3 BIDs are developed and managed by the business sector with projects being
partly funded through a compulsory levy, with the Elgin BID levy calculated on
the non-domestic rates valuation.  All tenants and, if applicable, property
owners, who will be subject to the levy, will be invited to vote on whether a
BID proposal will go ahead or not.  The voting on a BID is governed by
legislation, with the proposal only being able to go ahead if there is a minimum
turnout of 25% of eligible voters and more than half of the businesses voting
in favour; they must represent more than 50% of the rateable value of the
businesses that vote.  In Scotland the maximum duration of a BID is 5 years,
after that it will have to secure another mandate.  At present there are 33 BIDs
in Scotland. 
3.4 The first successful Elgin BID ballot took place in November 2009 with a
turnout of 45% and 75.25% voting in favour, representing 72% in favour by
rateable value. The renewal ballot in November 2014 had a turnout of 52.38%
with 56.48% voting in favour, representing 66.53% in favour by rateable value
and the renewal ballot in November 2019 had a turnout of 44.7% with 72.8%
voting in favour, representing 73.76% in favour by rateable value. 
3.5 The Elgin BID became operational on 1 February 2010 with the establishment
of the City of Elgin BID Ltd comprising of a board of 14 directors representing
a cross-section of businesses with 3 representatives of the public sectors
within the BID area.  The current board comprises 11 directors representing a
cross-section of businesses with 2 representatives of the public sectors. 
3.6 Building on the success of the previous and present City of Elgin BID, it is
proposed to secure a further 5-year mandate through a re-ballot process. The
request with highlights of what has been achieved during the present BID
phase is detailed in APPENDIX I. 
3.7 Surveys and consultation workshops with all stakeholders have commenced
with more scheduled to take place over the coming months to establish the
geographically defined area, priority themes, projects and services with
associated costs for the next business plan and proposal.  It is planned to
present the business plan including levy details to Corporate Committee on 27
August 2024.  Council must decide whether to veto the BID by 18 September
2024 - 70 days prior to the ballot date. 
3.8 Key Dates and Ballot – Under the legislation, 98 days’ notice is required to
the Scottish Government and Local Authority with the final BID business plan
and proposal being submitted by 20 August 2024.  It is proposed that the
ballot procedure will be sub-contracted to the Electoral Reform Society, which
has conducted the majority of BID ballots in the UK including the Elgin BID
ballot in 2009, 2014 and 2019.  The provisional dates are: 
• Publish notice of the ballot by 2 October 2024
• Ballot papers to be issued by 16 October 2024 
• Final day for voting papers to be received by 27 November 2024
• Announcement of ballot results by 29 November 2024 
Page 130

Page 131

4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The Elgin BID renewal ballot proposal will contribute to the corporate
plan priority to promote economic development and growth as well as
the LOIP priority of a growing and sustainable economy. 
(b) Policy and Legal
The legislation which implements BIDs in Scotland are: 
• The Planning etc. (Scotland) Act 2006
• The Business Improvement Districts (Scotland) Regulations 2007 
• The Business Improvement Districts (Ballot Arrangements)
(Scotland) Regulations 2007 and 
• The Planning etc. (Scotland) Act 2006 (Business Improvement
Districts Levy) Order 2007
• The Business Improvement Districts (Scotland) Amendment
Regulations 2007 and
• The Business Improvement Districts (Scotland) Amendment
Regulations 2008 
Under the legislation where the local authority is of the view that the BID
proposal or renewal and preliminary procedures conflict with a policy
formally adopted and published by the authority, the authority shall notify
the BID proposer in writing explaining the nature of that conflict. 
A local authority can veto a detailed BID proposal if it conflicts with any
of the above Acts or for reasons such as the proposed levy would create
disproportionate or unreasonable financial burden amongst rate payers.
However, an appeal against a veto will be decided by the Scottish
Ministers. 
As in the present Elgin BID arrangements, any proposed improvement
projects and services will be in addition to any existing provisions
provided by Moray Council and Community Planning Partners.  It is
intended to continue the operational agreement between Moray Council
and City of Elgin BID Company, which will be updated in consultation
with Legal to reflect all changes.  The purpose of the operating
agreement is to establish the procedure for the setting, collection and
remittance of the BID Levy; confirm the basis upon which the Council will
be responsible for collecting the BID Levy; set out the enforcement
mechanisms available for collection of the BID Levy; set out the
procedures for accounting and transference of the BID Levy; provide for
the monitoring and review of the collection of the BID Levy; confirm the
manner in which the Council’s expenses incurred (if any) in collecting the
BID Levy shall be paid and confirm the basis on which the BID
Arrangements are to be delivered by the BID Company on behalf of the
Council.  
Page 131

Page 132

(c) Financial implications
For the proposed renewal ballot of the Elgin BID any development
cost(s) such as surveys, printing and the ballot cost will be paid for by
City of Elgin BID Ltd.  Full details of the levy, including collection fees
and any software costs associated with the administration of the levy by
Taxation Team staff will be presented to committee in May 2024 
The BID Levy amount paid by Moray Council is dependent on the
number of properties that it occupies within the constituency of the City
of Elgin BiD Ltd. To provide some context, at the commencement of
2023-24, the Council was due to pay annual BiD Levy totalling
£16,246.00 
(d) Risk Implications
There are no risk implications arising from this report. 
(e) Staffing Implications
Officers from Economic Growth and Regeneration shall continue to work
with City of Elgin BID Ltd to maximise income from funding streams as
they arise and assist in the development of the next Elgin BID proposal. 
The Taxation Services Team supports the invoicing and recovery of the
BiD Levy. This requires the officers of that Team to work closely with the
City of Elgin BiD Ltd., ensuring invoices and reminders are issued
regularly and on schedule. The Taxation Team also maintains the BiD
Levy database, updating it with changes to the properties liable to pay
the BiD, and provides advice to the City of Elgin BiD Ltd. on maximizing
the revenue to be obtained from the BiD Levy invoices. 
The support of all aspects of the invoicing, and where necessary
recovery, of the BiD Levy and the maintenance of the invoicing database
represents a significant workload for the Taxation Team. 
(f) Property
Moray Council would be liable to pay a levy (yet to be finalised) for any
property which lies within the Elgin BID area, should the re-ballot be
successful. 
(g) Equalities/Socio Economic Impact
There are no equalities/social economic impacts arising from this report. 
(h) Climate Change and Biodiversity Impacts
Advocating Elgin City Centre and all it has to offer has the potential to
increase footfall from a local and wider geographical area.  Increased
local footfall could result in a positive impact, with less carbon emissions
through reduced travel.  For travel from a wider geographical area, the
promotion of sustainable travel can assist in mitigating the impact. 
(i) Consultations
The Depute Chief Executive (Economy, Environment and Finance), the
Head of Economic Growth and Development, the Head of Governance,
Page 132

Page 133

Strategy and Performance, the Equal Opportunities Officer, the Chief
Financial Officer, Taxation Manager and Lissa Rowan, Committee
Services Officer have been consulted and comments received have
been incorporated into the report. 
5. CONCLUSION 
5.1 The Elgin BID has proven to be a sustainable regeneration model for the
City Centre.  It is democratic, time bound, accountable and provides a
clear mandate for actions.  It relies on a strong, committed and solution
orientated partnership with a clear vision and leadership. 
5.2 The continued partnership working has enabled to attract additional
investments into Elgin, which could not have been achieved by a single
organisation. 
5.3 A successful renewal ballot of the Elgin BID will enable implementation
of further actions and priorities and ensures a vibrant future for the City
Centre. 
Author of Report: June Burnett, Development Officer
Background Papers: 
Ref: SPMAN-813460984-458 
Page 133

Page 134

Page 134

Page 135

APPENDIX I 
Elgin Business Improvement District (Embrace Elgin) has been working for and with the Moray
Council and the businesses in Elgin City Centre for the last 14 years.  We are proud to have raised the
profile of the Elgin business community, assisted new businesses to find properties & get established
and promoted Elgin as a place to Embrace, Enjoy and Explore.  
In Autumn 2024 we wish to return to Renewal Ballot, allowing the BID membership to decide if the
BID should continue for a fourth term.  Consultations and surveys have already begun with the
membership to gather their views, opinions and identify their priorities moving forward.
Below, you will find a short “Snapshot” of what has been achieved in Phase 3, more detailed
information can be found in the Annual Reports and Mid Term Review, all of which are available on
the Embrace Elgin Website- https://www.embraceelgin.co.uk/information-bulletins-company-
reports/ 
What Has Been Achieved
• Gull Management Project
o Our Gull Management Project has been ongoing since 2018. Alongside a variety of
preventative measures to stop the gulls from nesting we have also undertaken egg &
nest removal each year, we estimate around 1,200 eggs have been removed. This is
1,200 gulls that will not come back to nest each year when they reach mating age. 
o We have invested in two sonic devices in 2022 & 2023 with a further two being
installed for gull season in 2024. These devices have been proving very successful,
preventing gulls from nesting in the area and contributing to a more peaceful urban
environment. 
• Elgin Gift Card Launched – Town Centre Gift Card being accepted by more than 80 business
members, encouraging people to shop local- since 2018 this has equated to £96K which is
locked into the local business community. 
• Food & Drink Guide created – featuring every business member who supplies a food offering
(from sandwiches to steaks), this has been updated from a PDF to an interactive online map. 
• Business Map has been updated from a PDF to an online directory on our website which
links to every business’s website or social media (where they have it). 
• Extensive Elgin marketing – through printed press, radio and & social media 
• Business Promotion – Via social media utilising a variety of platforms - free to all BID
members.
o A new addition in 2023 was the Embrace Elgin Magazine where BID members can
advertise for free. The magazine goes to every residential & commercial property
within Elgin as well as pick up points at Elgin Library, Tesco & UHI Moray. 
• Property Support
o The BID office has continued to hold a number of vacant property keys on behalf of
agents and landlords. We have led on a collaborative approach working with Moray
Council’s departments when arranging viewings with potential tenants. 
Item 8
Page 135

Page 136

o Current available properties are listed on the Elgin BID website and highlighted on
media platforms. When potential new businesses are in touch with the office, they
are signposted to the available property page.
• Grants – yearly grant is available to all BID members. Since 2020 we have awarded 64
businesses a grant equating to over £25k in grant funding (our grant is 50% up to £500).
Grants can be applied for new signage, upgrading windows/doors, CCTV, gutter cleaning and
more. 
• Promotion of Moray Council support – assisted with promoting and gaining business
feedback on behalf of the Moray Council on their plans for the Elgin Town Centre
regeneration. 
• Business Member Bulletin – Keeping all members updated with what is happening and
activities they can get involved in 
• Mediation for members – Where businesses have a problem we are often called on for
support and advice 
• Learning Suite has been developed to support business needs that will be ran over the
course of a year which is free to their staff/volunteers. 
• Vacant Shop rate as of December 2023 was at 9.6%, this is still under the national average. 
• Moray Council COVID Grant & Town Centre Improvement Grant Support - A number of
grants were made available from Scottish Government through the Moray Council during
COVID to assist businesses. We supported a number of applicants either through helping fill
out the paperwork or by chasing up applications.
• Employment Opportunities- There is a dedicated page on our website where current
employment opportunities in the town centre are listed.
• Street Cleaning- We have employed two Street Ambassadors who on a weekly basis do litter
picks of the town centre collecting on average 8-12 large bags of litter. This is in addition to
the efforts of Moray Council's cleaning teams and the company we've hired for three
mornings each week. This commitment to cleanliness is a testament to our dedication to
keeping Elgin pristine.
• Brightening Up Plainstones: In late Summer 2023, we embarked on a project to paint the
lampposts and black tree benches around the Plainstones, adding a touch of vibrancy to this
central hub of our community. The project will continue into 2024, ensuring that all benches
receive a fresh coat of paint when stable weather conditions prevail.
o Bright bunting and flower arrangements are also organised by and arranged by BID.
o 2024 will also see the introduction of dwarf fruit trees to our town centre, not only
helping to combat carbon emissions but the fruit will also help the community. 
Page 136

Page 137

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 6 FEBRUARY 2024 
SUBJECT: INFORMATION REPORT: ENVIRONMENTAL STANDARDS
SCOTLAND IMPROVEMENT REPORT 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE)   
1. REASON FOR REPORT 
1.1 To inform the Committee of the Improvement Report by Environmental
Standards Scotland into the effectiveness of the systems in place to support
local authorities in their duty to contribute to the delivery of climate change
targets. 
1.2 This report is submitted to Committee in terms of Section III (F) (34) of the
Council's Scheme of Administration relating to providing, developing and
monitoring the Council’s Economic Development and Infrastructure Services. 
2. BACKGROUND 
2.1 On 6 December, Environmental Standards Scotland (ESS) published an
improvement report to the Scottish Government, in respect of the investigation
into the systems in place to support local authorities in the delivery of climate
change targets. The Improvement Report is available here. 
2.2 ESS was established under the UK Withdrawal from the European Union
(Continuity) (Scotland) Act 2021 (“the Continuity Act”) to fill the environmental
governance gap caused by the UK’s departure from the European Union. ESS
is an independent body, accountable to the Scottish Parliament. The role of
ESS is to ensure there is effective scrutiny of public authorities’ compliance
with environmental law, alongside the effectiveness of environmental law and
the way it is being implemented and applied in Scotland. ESS may investigate
matters in response to concerns brought to its attention (known as
representations), or on its own initiative.
Page 137

Page 138

2.3 Public bodies have had a range of climate change duties since 2009 which
aim to contribute to the delivery of net zero. ESS launched an investigation
into a number of these duties, including the support and scrutiny provided by
Scottish Ministers of how local authorities contribute to meeting climate
change targets. 
2.4 At a UK level, local authorities’ direct emissions account for between three to
five percent of an area’s emissions. Of all UK emissions, 82 percent are
estimated to be within the scope of influence of local authorities. Without
adequate support and scrutiny, it would be difficult to achieve the net zero
target. 
2.5 Scotland has failed to achieve eight out of twelve of its targets, which will
become increasingly difficult to meet in the 2020s. The consequences of not
achieving climate targets are serious. It is crucial that local authorities
demonstrate leadership by meeting their climate change responsibilities and
that robust systems are in place to help realise this. In light of what was
alleged within the representation and given the scale of emissions which local
authorities are directly responsible for, or have levers to influence, ESS took
the decision to launch an investigation into the effectiveness of the systems in
place to support local authorities in their contribution to the delivery of climate
change targets. 
2.6 The purpose of this investigation was to consider: the duties placed on local
authorities and Scottish Ministers in respect of the delivery of climate
legislation; the support that is available to this end; and the reporting and
monitoring of performance. 
3. THE INVESTIGATION AND IMPROVEMENT REPORT 
3.1 The following key points have been identified from ESS’ investigation: 
• there is inconsistency across the Public Bodies Climate Change Duties
(PBCCD) reports. These are the annual carbon reports submitted by local
authorities and public bodies to the Scottish Government. No definitive
overview of how their activity has been calculated to achieve best effect. 
• the data maturity of emissions calculations is weak, and reported
emissions data is unreliable. 
• there is no legal obligation on local authorities to report on Scope 3
emissions, which is the largest proportion of emissions. Scope 3
emissions are indirect emissions that occur in the upstream and
downstream activities of an organisation, for example: emissions from
wider supply chains; emissions from the use of local authority services;
contracted out services; and investments. 
• clarity on the proportionate extent of Scope 3 emissions is missing. 
• there is no legal obligation for local authorities to produce climate plans.
Page 138

Page 139

• although there is evidence to show that Scottish Ministers are co-
operating with public bodies, Scottish Government guidance to public
bodies is out of date, or non-statutory, and there is no single,
comprehensive, up-to-date, accessible source for climate practitioners. 
• strategies for co-ordinating government policy with local authority plans is
weak, and although support for co-ordination between local authorities is
available and well-regarded, the reporting process does not fulfil its aim to
encourage knowledge sharing between local authorities. 
• there is no evidence that public bodies’ climate change delivery is
monitored against reported progress, evaluated or scrutinised, despite
there being a legal mechanism to do so. 
3.2 In view of the above, ESS made the following recommendations to Scottish
Ministers: 
1. Make climate, adaptation and sustainability plans at local authority level
compulsory. 
2. Ensure that the planned statutory guidance covers the full breadth of local
authorities’ climate change responsibilities and includes the changes
which will be required as a result of the recommendations contained
within this report. 
3. Introduce a separate reporting framework for local authorities. 
4. Make the reporting of Scope 3 emissions mandatory for local authorities. 
5. Identify or introduce an appropriate monitoring body and give the
monitoring body the necessary powers, including the powers to: scrutinise
compliance; follow-up on climate plans; and recommend improvements in
climate activity. 
3.3 In line with ESS’ Strategic Plan, ESS invited the Scottish Government to work
with it to resolve the issues identified. The Scottish Government has agreed to
put in place measures which implement recommendations 1, 2, 3 and 5. In
respect to recommendation 4, where informal resolution has not been
achieved, the improvement report has been laid in the Scottish Parliament
under ESS’ statutory powers and Scottish Ministers must respond to this
recommendation in the form of an improvement plan to the Scottish
Parliament. 
4. POSSIBLE IMPLICATIONS OF RECOMENDATIONS 
4.1 The five recommendations from ESS may have the following implications as
the Council progresses Climate Change works:
1. Make climate, adaptation and sustainability plans at local authority level
compulsory. The Council already has a climate plan and officers are
working on baselining adaptation works to enable the production of an
adaptation plan. A Biodiversity Strategy is being developed which should
Page 139

Page 140

cover a lot of what may go in a sustainability plan. In addition, NPF4 has
significant requirements for climate change and biodiversity to be delivered
through the planning system which will be incorporated in the updated
Local Development Plan. At present the production of climate, adaptation,
and sustainability plans are not compulsory and there is flexibility on what
each Local Authority produces. If the production of plans is to be
compulsory, this may require nationally approved methodologies or
templates to help make these plans more uniform and ensure compliance
with the legislation. 
2. Ensure that the planned statutory guidance covers the full breadth of local
authorities’ climate change responsibilities. Comprehensive statutory
guidance on Climate Change legislation for Local Authorities is currently
being created at a national level. Officers are contributing to the
development of this guidance.
3. Introduce a separate reporting framework for local authorities. This means
there will likely be different PBCCD forms for LAs and for other public
bodies to complete annually. 
4. Make the reporting of Scope 3 emissions mandatory for local authorities.
This recommendation has not been accepted by Government Ministers at
the present time. If the reporting of Scope 3 emissions becomes mandatory
it would be a substantial piece of work for officers to calculate this on an
annual basis. At present there are no agreed methodologies and reporting
frameworks for Local Authorities to carry out this work. There are also
concerns that carrying out this substantial piece of work to get more
accurate data will not in itself ensure that there are enough follow up
actions to reduce these levels of carbon emissions. Rather even without
mandatory reporting, resources could continue to be focused on scope 3
emissions where there are more opportunities to control and therefore
reduce, for example commuting and waste. 
5. Identify or introduce an appropriate monitoring body to scrutinise LA climate
plans and give the monitoring body the necessary powers. This was
accepted by ministers and the body is likely to be the ESS. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The Council’s Corporate Plan 2019-2024 aims for Moray Council to be: 
“A resource efficient, carbon neutral council that works with partners to
mitigate the worst effects of Climate Change, to create a resilient, fair
and more sustainable future for everyone within Moray”.
Page 140

Page 141

(b) Policy and Legal
The Climate Change (Scotland) Act 2009 places a duty on public bodies
to act in the way best calculated to contribute to the delivery of
Scotland’s climate change targets; in the way best calculated to help
deliver any programme for climate change adaptation laid before the
Scottish Parliament; in a way it considers most sustainable. 
(c) Financial implications
There are no financial implications. 
(d) Risk Implications
There are no risk implications. 
(e) Staffing Implications
There are likely to be additional pressures on Climate Change staff to
report on our progress on carbon mitigation, adaptation and sustainable
action. 
(f) Property
There are no property implications. 
(g) Equalities/Socio Economic Impact
There are no equalities/socio economic impact implications. 
(h) Climate Change and Biodiversity Implications
There are likely to be no climate change or biodiversity implications
directly resulting from this report. The upcoming revision to the Council’s
Routemap to Net Zero Carbon Emissions and future updates to the
Climate Change Strategy will take account of the data within this report. 
(i) Consultations
Depute Chief Executive (Economy, Environment and Finance), the Head
of Economic Growth and Development, the Legal Services Manager, the
Equal Opportunities Officer, and L Rowan, Committee Services Officer. 
6. CONCLUSION 
6.1 The Improvement Report by ESS into the effectiveness of the systems to
support local authorities in their duty to contribute to the delivery of
climate change targets will have various implications to the Council, as
highlighted in the report, as the recommendations are carried out. 
Author of Report: Rod Lovie, Principal Climate Change Strategy Officer
Background Papers: As referred to in this report.
Ref: SPMAN-813460984-460 
Page 141

Page 142

Page 142

Page 143

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 6 FEBRUARY 2024 
SUBJECT: INFORMATION REPORT:  LIST OF PROPERTY
TRANSACTIONS CONCLUDED UNDER DELEGATED
POWERS 
BY: DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT &
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of property transactions which have been dealt with
under delegated powers. 
1.2 This report is submitted to the Economic Development and Infrastructure
Services Committee in terms of Section III F (5) of the Council's Scheme of
Administration relating to industrial and commercial development. 
2. BACKGROUND 
2.1 In terms of the Council’s Scheme of Delegation, the Head of Housing and
Property has delegated authority to conduct rent reviews and fix new rents. 
2.2 In terms of the Council’s Scheme of Delegation, the Head of Housing and
Property has delegated authority to grant leases, licenses or other occupation
agreements of land and buildings for 25 years or less duration where the
initial rent does not exceed £35,000 per annum and sites on long term
building leases of up to 125 years duration where the initial rent does not
exceed £35,000 per annum. 
2.3 In terms of the Council’s Scheme of Delegation, the Head of Housing and
Property has delegated authority to approve acquisitions of heritable property
up to a value of £250,000 where appropriate provisions have been made in
the Capital or Revenue Plan. 
2.4 In terms of the Council’s Scheme of Delegation, the Head of Housing and
Property has delegated authority to grant wayleaves or servitudes over
Council owned property. 
Page 143

Page 144

2.5 In terms of the Council’s Scheme of Delegation, the Head of Housing and
Property has delegated authority to grant assignations of existing leases
where the terms of lease remain substantially unaltered and to authorise sub-
lets. 
2.6 In terms of the Council’s Scheme of Delegation, the Head of Housing and
Property has delegated authority to accept the highest offer received for
surplus heritable property provided that the highest offer received is for a sum
no less than the price at which the property has been offered for sale on the
open market. 
3. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The proposals support the aim of delivering financial stability. 
(b) Policy and Legal
None. 
(c) Financial Implications
The transactions detailed in APPENDICES I, II, IV and VI will generate
monies to the Council. 
There are monies allocated in the Capital Plan for the transaction
detailed in APPENDIX III. 
(d) Risk Implications
None. 
(e) Staffing Implications
None. 
(f) Property
None. 
(g) Equalities/Socio Economic Impact
None. 
(h) Climate Change and Biodiversity Impacts  
None. 
(i) Consultations
None. 
4. CONCLUSION 
4.1 It is recommended that the Committee notes the 28 rent reviews, 17
leases, 2 road compensation claims, 1 wayleave, 1 assignation and 1
property disposal as set out in APPENDICES I, II, III, IV, V and VI. 
Page 144

Page 145

Author of Report: Stuart Beveridge, Asset Manager (Commercial Buildings)
Background Papers: 
Ref:   SPMAN-1285234812-1490 
Page 145

Page 146

Page 146

Page 147

APPENDIX I
REPORT TO THE ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES COMMITTEE ON 6 FEBRUARY 2024 
LIST OF RENT REVIEWS OF BUILDINGS AND SITES - SUBMITTED FOR NOTING 
1. Ref No.
2. Valuer’s Ints.
1. Address
2. Tenant
1. Building (m²) 
2. Site (Ha)
1. Date of Entry
2. Review Period
Interval
1. Previous Rent
2. New Rent
Remarks
1. FR/1/214 
2. IAWA
1. 12 West Road, Forres 
2. C & P Garage Services Ltd
1. 200.5sqm 
2. 0.04Ha
1. 3/7/17 
2. 3 years
1. £15,950 p.a. 
2. £16,896 p.a.
Permitted Use:
Car repair workshop &
potential MOT station.
1. EL/1/120 
2. ALBU
1. Site Adjacent 1A Chanonry
Road South, Elgin 
2. Jim’s Garage (Shetland) Ltd
1. - 
2. 0.03Ha
1. 1/7/17 
2. 3 years
1. £1,700 p.a. 
2. £2,025 p.a.
Permitted Use:
Parking & display of
motor vehicles for.
1. EL/1/210 
2. IAWA
1. 4 Chanonry Road South, Elgin 
2. Loomis UK Ltd
1. 538sqm 
2. 0.14Ha
1. 18/12/15 
2. 3 years
1. £32,900 p.a. 
2. £35,500 p.a.
Permitted Use:
Use as a secure
distribution & storage
depot.
1. EL/8/208 
2. STBE
1. Units 8 & 9 Tyock Industrial
Estate, Elgin 
2. Highland Motor Parts Ltd
1. 408sqm 
2. 0.041Ha
1. 15/1/18 
2. 3 years
1. £28,000 p.a. 
2. £32,640 p.a.
Permitted Use:
Storage & distribution
of motor vehicle parts
& accessories with
ancillary sales.
Page 147

Page 148

1. EL/8/228 
2. STBE
1. Units 28 & 29 Tyock Industrial
Estate, Elgin 
2. Glyn Minshull
1. 216sqm 
2. 0.02Ha
1. 21/12/17 
2. 3 years
1. £14,400 p.a. 
2. £17,260 p.a.
Permitted Use:
Workshop & store for
upholstery business.
1. LO/1/202 
2. IAWA
1. Unit 2 Coulardbank Industrial
Estate, Lossiemouth 
2. MT Autos Lossie Ltd
(SC487475)
1. 70.05sqm 
2. 0.04Ha
1. 1/10/08 
2. 3 years
1. £6,350 p.a. 
2. £7,250 p.a.
Permitted Use:
Retailing of second-
hand motor vehicles.
1. EL/5/108 
2. ALBU
1. 3 Parade Spur South, Elgin 
2. Raymond Spence & Sandra
Anne Spence
1. - 
2. 0.01Ha
1. 30/10/83 
2. 5 years
1. £665 p.a. 
2. £865 p.a.
Permitted Use:
Use for the purposes
of tenant’s plastering &
tiling business &
general builder trader
purposes.
1. DU/1/201 
2. ALBU
1. 5 Dufftown Industrial Estate,
Dufftown 
2. Moray Electrical Services Ltd
1. 76.6sqm 
2. 0.03Ha
1. 1/11/17 
2. 3 years
1. £4,645 p.a. 
2. £5,150 p.a.
Permitted Use:
Workshop & store in
connection with an
electrical business.
1. EL/1/118 
2. ALBU
1. 2 Chanonry Street, Elgin 
2. Gary McKnockiter & Walter
Ritchie
1. - 
2. 0.14Ha
1. 1/11/98 
2. 5 years
1. £4,260 p.a. 
2. £5,230 p.a.
Permitted Use:
Garage workshop &
showroom for the sale/
refurbishment & repair
of second-hand cars.
1. BK/1/223 
2. IAWA
1. 10A March Road East, Buckie 
2. Lawrie’s Light Haulage
1. - 
2. 0.06Ha
1. 3/2/17 
2. 3 years
1. £2,275 p.a. 
2. £2,500 p.a.
Permitted Use:
Storage compound for
light haulage business. Page 148

Page 149

1. EL/1/131 
2. ALBU
1. Chanonry Court, 23 Chanonry
Road South, Elgin 
2. ESL Investments Ltd
SC 556361
1. - 
2. 0.74Ha
1. 18/4/19 
2. 5 years
1. £18,865 p.a. 
2. £28,200 p.a.
Permitted Use:
Development of
industrial units &
stores with yard & car
parking minimum
industrial buildings
1,250sqm.
1. KE/555/1 
2. ALBU
1. Keith Golf Course, Keith 
2. Keith Golf Club
1. - 
2. 22.27Ha
1. 24/5/13 
2. 5 years
1. £5,040 p.a. 
2. £5,040 p.a.
Permitted Use:
Use as a golf course.
1. EL/1/134 
2. ALBU
1. 14 Chanonry Road South, Elgin 
2. ESL Investments Ltd
(SC556361)
1. - 
2. 0.33Ha
1. 5/7/18 
2. 5 years
1. £10,280 p.a. 
2. £14,420 p.a.
Permitted Use:
Development of a
depot with workshop
offices & yard.
1. EL/1/116 
2. ALBU
1. 1 Chanonry Street, Elgin 
2. Trustees of the William T &
Denise A Miller SIPP Trusts
1. - 
2. 0.41Ha
1. 8/3/93 
2. 5 years
1. £14,500 p.a. 
2. £18,250 p.a.
Permitted Use:
To be used as a
builder’s yard.
1. EL/8/222 
2. STBE
1. Unit 22 Tyock Industrial Estate,
Elgin 
2. Wolseley UK Ltd
1. 397.3sqm 
2. 0.06Ha
1. 20/4/11 
2. 3 years
1. £24,950 p.a. 
2. £29,350 p.a.
Permitted Use:
Wholesale warehouse
with trade counter for
the storage,
distribution & related
sales of plumbing &
building supplies.
Page 149

Page 150

1. HN/750/9 
2. ALBU
1. Stores 31 & 14 Hopeman
Harbour, Hopeman 
2. Carrie Hellyer
1. 125.4sqm 
2. -
1. 11/2/06 
2. 3 years
1. £2,300 p.a. 
2. £2,585 p.a.
Permitted Use:
Sale of nautical goods
& collectable items,
chandlery products,
arts & crafts, tea &
coffee to takeaway,
ice-cream.
1. EL/1/233 
2. IAWA
1. 15 Chanonry Road South, Elgin 
2. Embassy OFD Ltd (SC428753)
1. 180sqm 
2. 0.05Ha
1. 1/8/14 
2. 3 years
1. £16,100 p.a. 
2. £17,000 p.a.
Permitted Use:
Workshop & storage in
relation to light
engineering &
fabrication.
1. BK/750/91 
2. ALBU
1. 28 Commercial Road, Buckie 
2. Ocean Winds UK Ltd
(No 07101190)
1. - 
2. 0.31Ha
1. 5/1/23 
2. Annually
1. £31,290 p.a. 
2. £32,750 p.a.
Permitted Use:
Depot for offshore
windfarm with offices &
car park.
1. KE/5/202 
2. ALBU
1. Unit 2 Newmill Industrial Estate,
Keith 
2. Donald Noble
1. 71sqm 
2. 0.03Ha
1. 1/11/02 
2. 3 years
1. £4,300 p.a. 
2. £5,200 p.a.
Permitted Use:
Joiner’s workshop.
1. EL/1/106 
2. ALBU
1. 7 Chanonry Road South, Elgin 
2. Elgin Assets Ltd (Registered
Number 07337006)
1. - 
2. 0.4Ha
1. 5/7/11 
2. 5 years
1. £13,100 p.a. 
2. £14,600 p.a.
Permitted Use:
Development of
builder’s merchant
yard/depot.
Page 150

Page 151

1. MW/580/1 
2. STBE
1. Nether Dallachy Landfill Site,
Nether Dallachy, Spey Bay 
2. Crown Estate Commissioners
1. - 
2. 31.54Ha
1. 1/4/93 
2. 5 years
1. £20,683 p.a. 
2. £24,437.50 p.a.
Permitted Use:
Council Landfill site. 
Council is tenant of
Crown Estate
Scotland.
1. EL/1/235 
2. IAWA
1. 19 Chanonry Road South, Elgin 
2. David Michael Ritchie
1. 110sqm 
2. -
1. 1/9/14 
2. 3 years
1. £8,950 p.a. 
2. £9,850 p.a.
Permitted Use:
Printer’s workshop &
store.
1. EL/1/306 
2. IAWA
1. Yard to Rear of No 17
Chanonry Road South, Elgin 
2. Sandra McCrea
1. - 
2. 0.4Ha
1. 1/2/21 
2. 3 years
1. £1,925 p.a. 
2. £2,200 p.a.
Permitted Use:
Use for storage of
materials & equipment
in connection with
tenant’s business.
1. LO/1/105 
2. IAWA
1. Unit 5 Coulardbank Industrial
Estate, Lossiemouth 
2. Kenneth Ellis
1. - 
2. 0.11Ha
1. 31/1/89 
2. 5 years
1. £3,430 p.a. 
2. £4,725 p.a.
Permitted Use:
Car sales/preparation,
servicing & body repair
with associated offices
in connection with
tenant’s business.
1. EL/5/120 
2. ALBU
1. 3 Perimeter Spur, Elgin 
2. Aberlour Child Care Trust
(SC312912)
1. - 
2. 0.03Ha
1. 1/2/83 
2. 5 years
1. £1,400 p.a. 
2. £2,000 p.a.
Permitted Use:
Project run for
vulnerable &
disaffected young
people.
Page 151

Page 152

1. FR/4/202 
2. IAWA
1. 3 Waterford Circle, Forres 
2. James MacNaught
1. 70sqm 
2. -
1. 1/12/14 
2. 3 years
1. £5,700 p.a. 
2. £7,000 p.a.
Permitted Use:
Storage & manufacture
of garage doors with
ancillary sales.
1. EL/1/217 
2. IAWA
1. 12 Chanonry Road North, Elgin 
2. Blair Sinclair
1. 110sqm 
2. 0.05Ha
1. 23/12/11 
2. 3 years
1. £10,600 p.a. 
2. £11,960 p.a.
Permitted Use:
Tyre fitter’s depot.
1. MO/1/300 
2. IAWA
1. 2 Mosstodloch Industrial
Estate, Mosstodloch 
2. Allan McDonald
1. - 
2. 0.16Ha
1. 5/2/05 
2. 5 years
1. £3,600 p.a. 
2. £4,225 p.a. 
Permitted Use:
Fabrication &
engineering facility. 
Page 152

Page 153

APPENDIX II
REPORT TO THE ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES COMMITTEE ON 6 FEBRUARY 2024
LIST OF LEASES OF BUILDINGS AND SITES – SUBMITTED FOR NOTING 
1. Reference No. 
2. Officer’s Ints
1. Address 
2. Tenant
1. Building (m²) 
2. Site (Ha) 
1. Date of Entry 
2. Review Period
Rent
(per annum)
Remarks
1. FR/2/201 
2. IAWA
1. 4 Greshop Road, Forres 
2. Shona Darnley, T/A
AyeDo Events
1. 122.2sqm 
2. 0.04Ha
1. 1/8/23 
2. 3 years
£10,600 Permitted Use:  Storage &
workshop in association
with tenant’s events
business.
1. NE/430/1 
2. ALBU
1. Newmill Public Hall,
South Street, Newmill 
2. Newmill Village Hall
Management Committee
1. 384.8sqm 
2. 0.1Ha
1. 1/11/23 
2. None
£1 Permitted Use: 
Community Hall for
purposes of community
education, physical &
mental training, social,
moral & intellectual
development.
Rent limited by terms of
deed.
1. BK/750/99 
2. ALBU
1. 5 Commercial Road,
Buckie 
2. Scottish Hydro Electric
Power Distribution PLC
1. - 
2. -
1. 1/9/23 
2. None
£1 Permitted Use: 
Development of electricity
sub-station. 
Page 153

Page 154

1. KE/3/254 
2. ALBU
1. Unit B & C Isla Bank
Mills, Keith 
2. Oakwood Cooperage Ltd
1. 217.6sqm 
2. 0.08Ha
1. 28/8/23 
2. 3 years
£15,000 Permitted Use:  Storage &
repair of casks & ancillary
purposes.
1. EL/5/273 
2. IAWA
1. Unit G Pinefield
Business Centre, Elgin 
2. Absolute Forestry LLP
(SO306973)
1. 60.37sqm 
2. -
1. 3/8/23 
2. 3 years
£4,600 Permitted Use:  Workshop
& store in connection with
tenant’s forestry
contracting business.
1. EL/1/215 
2. IAWA
1. 8 Chanonry Road North,
Elgin 
2. Fraysia Ltd, T/A
Knockomie Hotel
1. 70sqm 
2. 9.64Ha
1. 12/9/23 
2. 3 years
£6,500 Permitted Use:  Storage of
goods.
1. EL/565/3 
2. STBE
1. Pavilion & Pitch, 6
Perimeter Road, Elgin 
2. New Elgin Football Club
Ltd (SC750309)
1. 140sqm 
2. 0.82Ha
1. 1/10/23 
2. None
£1 if asked Permitted Use:  Nominal
rent reflects tenant’s
obligations to improve
pavilion.
1. EL/1/136 
2. ALBU
1. 3 Chanonry Road North,
Elgin 
2. Northscaff Ltd
SC564107
1. - 
2. 0.231Ha
1. 1/11/23 
2. 5 years
£8,550 Permitted Use: 
Builders/Scaffolders yard
development.
Page 154

Page 155

1. KE/4/252 
2. ALBU
1. Unit B, Balloch Road,
Keith 
2. Direct Labour
Organisation
1. 246sqm 
2. 0.052Ha
1. 25/9/23 
2. 3 years
£11,000 Permitted Use:  Builders
store.
1. PK/GEN 
2. CQ
1. McLeod Park,
Portknockie 
2. SUSTRANS
1. - 
2. 0.035Ha
1. 30/10/23 
2. 4 months
£738 Permitted Use: 
Contractors site compound
in relation to adjacent
surface improvement
works to NCN1 Coastal
Pathway. 
1. Street
Traders/GEN 
2. CQ
1. Millbuies Country Park,
Fogwatt 
2. Mrs T Clear (Willow &
Birch)
1. - 
2. 0.005Ha
1. 11/9/23 
2. 1 Year
£550 Permitted Use:  Mobile
vendor permission to site
on & trade from Council
ground.  Vendor holds
valid Outdoor Serving
Licence. 
1. KE/410/2 
2. STBE
1. Nursery in Community
Centre, Banff Road,
Keith 
2. Keith Play Centre Ltd
1. 129sqm 
2. 0.0652Ha
1. 2/8/21 
2. Annually
2/8/21 – 1/8/22  £3,671
2/8/22 – 1/8/23  £1,600
2/8/23 – 1/8/24  £3,200
2/8/24 – 1/8/25  £4,800
2/8/25 – 1/8/26  £6,400
2/8/26 – 1/8/27  £8,000 
Permitted Use:
Childcare. 
Page 155

Page 156

1. EL/555/15 
2. STBE
1. Car Park, Deanshaugh
Playing Fields,
Lesmurdie Road, Elgin 
2. Johnstons of Elgin
1. - 
2. 0.36Ha
1. 13/11/23 
2. None
£1,800 Permitted Use:  
Short term lease until
22/12/23 for staff car
parking.
1. BK/GEN 
2. CQ
1. 23 East Church Street,
Buckie 
2. 
1. 835sqm 
2. 0.0835Ha
1. 30/10/23 
2. 
£564 Permitted Use:  
Contractors site access
licence in relation to works
at rear of 23 Church Street
to establish community
garden.
1. BK/1/220 
2. IAWA
1. 16 & 17 March Road
East, Buckie 
2. Iain Flett Addison
1. 140sqm 
2. 0.05Ha
1. 13/11/23 
2. 3 years
£11,900 Permitted Use: 
Automotive repairs. 
1. EL/1/234 
2. IAWA
1. 17 Chanonry Road
South, Elgin 
2. Sam Jayrockyj
1. 70sqm 
2. 0.01Ha
1. 6/11/23 
2. 3 years
£6,500 Permitted Use:  Gardening
business. 
1. EL/3/202 
2. STBE
1. 2 Linkwood Lane, Elgin 
2. Colin Stewart
1. 99.96sqm 
2. 0.0199Ha
1. 27/11/23 
2. 3 years
£8,000 Permitted Use:  Vehicle
diagnostics. 
Page 156

Page 157

APPENDIX III
REPORT TO THE ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES COMMITTEE ON 6 FEBRUARY 2024 
LIST OF ROAD ACQUISITIONS – SUBMITTED FOR NOTING 
Officers
Intls
Plot No/Road Improvement
Scheme
Description of Land to be
Acquired
Land Owner Compensation
Agreed
Comments
ALBU Plots 1 – 4 C25E
Duffus to Roseisle Road
Widening
Land for road widening Mr Edward Dunbar £7,400 Compensation inclusive of
agents fees. 
ALBU Plot 3 C25E
Duffus to Roseisle Road
Widening
Land for road widening
tenant interest
Mr Andy Anderson £750 Compensation inclusive of
agents fees. 
Page 157

Page 158

Page 158

Page 159

APPENDIX IV 
REPORT TO THE ECONOMIC DEVELOPMENT & INFRASTRUCTURE SERVICES COMMITTEE ON 6 FEBRUARY 2024 
GRANT OF SERVITUDES AND WAYLEAVES 
Officer Intls  File Ref  Address Description Price  Comments
CQ Wayleaves/
Electric
Lands at Calcots Road, Elgin
Grid Ref:  NJ 260963530
Wayleave to SSEN £42.60 Low voltage connection
through Council amenity
ground for Lesmurdie
development. 
Page 159

Page 160

Page 160

Page 161

APPENDIX V 
REPORT TO THE ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES COMMITTEE ON 6 FEBRUARY 2024 
LIST OF ASSIGNATIONS OF SITES/UNITS - SUBMITTED FOR NOTING 
1. Ref No
2. Valuer’s Ints
1. Assignor
2. Assignee
Address Lease Details Remarks
1. EL/3/206 
2. STBE
1. Dave Lineham 
2. Scott Abernethy
6 Linkwood Lane
Elgin
Moray
IV30 1HX
Lease Commenced
1/11/94
Lease Term
21 years
Rental
£10,600 per annum 
Permitted Use:
Sale, repair &
maintenance of motor
cars & spare parts. 
Page 161

Page 162

Page 162

Page 163

APPENDIX VI 
REPORT TO THE ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES COMMITTEE ON 6 FEBRUARY 2024 
LIST OF PROPERTY DISPOSALS - SUBMITTED FOR NOTING 
Officer
Initials
Address Description Purchaser 1. Asking Price
2. Highest Offer
Date Sold Comments
STBE Auchernack House,
Forres
Former Council
Offices
UK Earth Ltd
(SC763544)
1. £100,000 
2. £101,150 
15/12/23 To be used as a
sustainability hub. 
Page 163

Page 164

Page 164

Page 165

REPORT TO: ECONOMIC, DEVELOPMENT AND INFRASTRUCTURE 
SERVICES COMMITTEE ON 6 FEBRUARY 2024 
SUBJECT: INFORMATION REPORT: SSEN COMMUNITY RESILIENCE
FUNDING 
BY:    DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT 
AND FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of Grant Funding received from Scottish Southern
Electrical Network (SSEN) to Moray Council. 
1.2 This report is submitted to Committee in terms of Section III (F) (32) of the
Council's Scheme of Administration relating to Emergency Planning and
Home Defence. 
2. BACKGROUND 
2.1 A number of significant storms have caused damage and disruption in the
Grampian area between 2021 and 2023.  In response to these events SSEN
awarded each of the 3 Grampian Local Authorities grant funding to spend on
supporting the authorities in developing Community Resilience and Resilience
infrastructure.  Moray Council received £200,000 of this funding. 
2.2 Before awarding the grant funding, SSEN required each authority to submit a
proposal with allocated spend against each of its proposed projects.  The
table below provides details of the projects Moray Council proposed, with
estimated spend, which was approved by SSEN who awarded the £200,000.
The actions in the table relate to needs identified through the ongoing work by
the Community Support Unit and Emergency Planning Officer to develop
Community Resilience across Moray  
Page 165

Page 166

Project Aim Resilience
Theme &
Area
Enhanced
Costs Progress
Household
resilience
Leaflets–
Mailshot
Provide Moray Council and co-branded
SSEN Household Resilience leaflets
delivered to every address in Moray.  Blanket
coverage designed to ensure that all 42,000
households regardless of circumstance had
access to a minimum level of information
(Appendix A). 
This will capture all vulnerable persons in
Moray but also raise awareness of
requirements for all.   
Individual &
Family
Resilience
Household
Resilience
Community
Resilience 
Skills &
Knowledge
Information 
£7,500 £5599.19 has been
spent on the
Household
Resilience Booklet.
Each household in
Moray received a
Booklet in
December 2023.  
A copy of the
booklet is attached
as Appendix A
Annual
Community
Resilience
Conference
Funding is available for a Community
Resilience conference in 2023, 2024 and
2025.  The conference will facilitate sharing
of ideas and experiences, good practice and
learning to develop plans, practice, and
activities to reduce vulnerability in the
community. 
To assist in developing mutual aid support
delivery between Communities resilience
groups in regard to volunteering and
equipment usage. 
Individual &
Family
Resilience
Household
Resilience
Community
Resilience 
Skills &
Knowledge
Information 
Equipment
Facilities 
Community
Cohesion 
£7,500 £985 was spent on
the second Annual
Community
Resilience
Conference held in
Lhanbryde in
September 2023.   
Battery
Pack Loan
Scheme
Provision of battery generator packs to
support the most vulnerable individuals who
need to use power reliant medical equipment
within their own property during a power
outage.  
HSCM will own the battery generator packs
and loan these out to vulnerable individuals
whose reliance of the medical equipment is
critical.     
Individual
Resilience
Household
Resilience
Health and
wellbeing 
Equipment 
£18,000  HSCM are in the
process of
identifying a suitable
Battery Pack for use
in support of home
issued medical
equipment, and
these will be
purchased when
this is completed. 
HSCM will then
administer and
deliver the Battery
Pack Loan scheme. 
Community
Information
and Co-
ordination
hubs
Moray has a diverse topography with the
population being spread across large and
small towns and remote rural and coastal
communities which can often become
exposed to severe weather conditions.  This
leads to complexities in service delivery in
times of emergency and challenges in co-
ordination and communication between
category 1 and 2 responders and as well as
local community groups and residents being
able to access support. 
Individual &
Family
Resilience
Household
Resilience
Community
Resilience 
Skills &
Knowledge
Information 
Equipment
£160,000
approx.
A project team has
been established to
deliver on the power
supply requirements
of the Community
Information and Co-
ordination hubs. 
With the aim to
have these hubs
fully power resilient
and capable of
Page 166

Page 167

Project Aim Resilience
Theme &
Area
Enhanced
Costs Progress
Funding for the provision of diesel generators
to three schools managed by Moray Council. 
That will be used as Community Information
and Co-ordination hubs –in times of power
outages and or Major incidents. 
The areas being put forward for the creation
of the 3 Community information and Co-
ordination hubs are Aberlour – Buckie and
Forres 
Moray Council has a location in Elgin that is
already power resilient to make up a 4th
Community Information Co-ordination hub
that would cover Elgin and surrounding
areas. 
Facilities 
Community
Cohesion 
Safe Place 
Educational
development
opportunity
operational delivery
by the end of 2024. 
Community
Resilience
group
Tabletop
exercises
Community Resilience Tabletop exercises for
established groups to allow them to stress
test their plans and identify areas of
development to ensure they maximise
response capabilities to support community
needs. 
These will be delivered by Moray Councils
Emergency planning department and
Community Support Unit.  Blue light Services
will be invited to take part as will SSEN and
the Red Cross. 
1. Elgin
2. Forres, Findhorn, Kinloss, Finderne
3. Strathisla, Keith
4. Lossie, Hopeman, Burghead &
Cummingston
5. Fochabers (Milnes area, incl
Inchberry)
6. Speyside, Glenlivet, Tomintoul
7. Buckie, Cullen & Deskford,
Portgordon, (Findochty/ Portknockie)
8.          Community Resilience Co-ordinators
Major Incident Exercise 
Individual
Resilience
Household
Resilience
Family
Resilience
Community
Resilience 
Skills &
Knowledge 
Partnership
working
development
£4000 Community
Resilience group
Tabletop exercises
will be progressed
by the emergency
planning officer and
education and
communities
support officer
throughout 2024.  
Household
Emergency
packs
Develop a stock of equipment that can be
distributed across Moray and consisting of
(for example – not limited to): 
• Wind up torches
• Wind up radios
• General personal resilience products 
These would be distributed on a needs basis
as part of general emergency preparation
and given out when an emergency occurs. 
This can help develop individual resilience
for those who may be financially vulnerable.
Individual
Resilience
Household
Resilience
Family
Resilience
Community
Resilience 
Equipment 
£3000 Household
Emergency packs
equipment will be
purchased by end of
April 2024 and
passed to the
established
community
resilience groups to
manage and
distribute at point of
need. 
Page 167

Page 168

2.3 Progress has been made on several of the proposed projects and details of
this progress is provided in table above. 
2.4 SSEN have agreed that if a project stream has an underspend, then this can
be used in another agreed project stream.  Any spend out with the project
streams agreed would need to be presented to and agreed with by SSEN. 
3. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP) 
Empowering and connecting communities. 
(b) Policy and Legal The Council is required to respond to an emergency in
accordance with the Civil Contingencies Act 2004 (Contingency
Planning) (Scotland) Regulations 2005 
(c) Financial implications
There will be ongoing maintenance costs for the Generator equipment
situated at the 3 identified Community Information and Co-ordination
hubs. The project spend is looking to incorporate the first 3 years of
Maintenance costs of around £13500 for all 3 locations. Ongoing
maintenance costs will be absorbed by Education RM budget. 
(d) Risk Implications 
There are no risks associated with the recommendations in this report. 
(e) Staffing Implications
The projects identified are being supported and delivered by staff from
within the Council, specifically, Consultancy, Education and
Communities and Housing and finance.   
(f) Property
3 Education and Community properties will act as the Community
Information and Co-ordination hubs.  The location of each Hub will be
agreed in consultation with Property and Education Services. 
(g) Equalities/Socio Economic Impact
An Equality Impact Assessment is not required. 
(h) Climate Change and Biodiversity Impacts
Where possible sustainable resilience actions have been identified.  Also
generators will be stored at the required location to reduce the need for
transportation. 
(i) Consultations
Depute Chief Executive (Economy Environment and Finance), Head of
Environmental and Commercial Services, Acting Head of ERC, Chief
Financial Officer, Legal Services Manager, Equal Opportunities Officer,
Committee Services Officer and Asset Manager Property have been
consulted and their comments incorporated into the report. 
Page 168

Page 169

4. CONCLUSION 
4.1 Moray Council has received grant funding of £200,000 from SSEN to
help the council support resilience in the community. 
4.2 A number of projects have been identified to support community
resilience in Moray, during disruptive events. 
Author of Report:  Ross Ferguson – Emergency Planning Officer 
Background Papers: 
Ref: SPMAN-524642768-1023 
Page 169

Page 170

Page 170

Page 171

Household Resilience:
Planning for Emergencies
This information has been sent on behalf of your Community Council.
We live in a relatively safe and stable
society where we expect infrastructure
to function as intended. Yet, life in
Moray depends on power, water
supply and the internet - which in
turn makes us vulnerable. Storms,
pandemics, natural disasters or
technical problems can result in power
outage, water supply cut-offs or lack of
essential goods.
A major event or crisis will affect
residents and many people will be in
need of help all at once. If a larger part
of our population is able to take care
of themselves and those around them,
immediate help from the emergency
services is more likely to reach those
who need it most first.
We are asking all households in
Moray to take a few simple steps
to improve their own emergency
preparedness.
It’s very important to think about
and plan for what you will do in
an emergency before it happens to
significantly reduce the risks to you and
your household.
The aim of this booklet is to provide
clear, simple and practical advice
on preparing your home and
household, including preparing a
household emergency plan. A lot of the
information may seem common sense,
but it has saved lives in the past.
Page 171

Page 172

Resilient communities can come down
to being a good neighbour. Knowing
who can provide a bit of assistance, or
who might need it, makes a difference
when emergencies happen. 
It’s very important to think about
and plan for what you will do in
an emergency before it happens to
significantly reduce the risks to you and
your household. The next few pages
are to help you prepare yourself and
your household.
Keep this booklet somewhere easy
to access along with your home
emergency kit, if you are able to
prepare one.
Make a household
emergency plan
Community resilience is communities
and individuals that are prepared,
able to respond to and recover
from emergencies in a way that
complements the work of the
emergency services.
Community Councils, and Development
Trusts, across Moray have been
forming Community Resilience
Groups (CRG) to develop emergency
preparedness in their area. CRGs
are volunteers in your community,
who are leading on developing a
local ‘Community Emergency Plan’
that outlines what volunteers can do
in an emergency situation to support
their community. These groups do
not do the work of the Emergency
Services. If their plan is activated, they
will communicate with Moray Council
and can be a point of contact and
support for local residents.
If you would like to get involved in your
local CRG, or to let them know you’d
be willing to volunteer, email your local
community council or:
What is community
resilience?
communitycouncils@moray.gov.uk
Page 172

Page 173

Make sure you and your family know how to use 999 responsibly. If the
emergency means it’s not safe to go out, the advice is usually to:
Go In: Go indoors and close all windows and doors.
Stay In: Stay indoors as long as it is safe to do so. Use this time to                               
confirm that you are safe to your emergency friend(s).
Tune In: Local radio, TV or the internet, where public information and advice
from the emergency responders will be broadcast.
Local Radio:
Local Information/ Social Media:
You should pick a friend or relative to
be your emergency friend(s) who you
will let know that you are OK in an
emergency situation.
Some ways you might help each other
are:
•Swapping house keys.
•Providing each other with a place to
stay if you have been evacuated from
your home.
•Arranging to look after each others’
children or to pick them up from school if
you have an emergency at work or in the
family.
•If you’re suffering from an infectious
disease, like flu, the NHS might ask
you to send someone to collect your
medication for you.
•Take copies of your most important
documents or pictures and keep them
safe for each other.
Make sure this person knows you
plan to check in with them should a
disruptive event happen in your area.
Make sure your household knows who
your emergency friend(s) are.
Page 173

Page 174

Identity documents
(passport, drivers
license)
Bottles of water
Non-perishable
foods (baby food/
pet food)
First-aid kit
(essential medicines)
Change of clothes
(warm jumpers,
blankets)
Chargers (portable
charging banks)
Radio (wind-up or
spare batteries)
Torch (wind-up or
spare batteries)
Whether you have to stay in or get out, preparing a small emergency kit will help
you get through. Keep it in a safe place a home, in a waterproof bag if possible,
where you can reach it easily. Top items to include are:
(You can use this as a kit check-list)
Name: .............................
Address: ..........................
.........................................
Tel. No: ............................
Name: .............................
Address: ..........................
.........................................
Tel. No: ............................
Other things to consider: money, spare car or house keys, toiletries, pen and
paper, copies of insurance policies, spare glasses or contact lenses...
Emergency Friend 1: Emergency Friend 2:
Page 174

Page 175

Health Centre ................................... Water Supplier .................................
School ............................................... Gas Supplier ....................................
Carers/ Childminders ........................... Work .................................................
Plumber ............................................. Vet .....................................................
Insurance(s) ........................................................................................................
Other numbers ....................................................................................................
..............................................................................................................................
Our Community Safe Place is:
If you have to leave your home, get out, stay out and take others with you.
Choose two safe places, one close by and one further away, where your
household can regroup should you need to:
Your local Community Resilience Group may have a plan in place to open a safe
space in your community in challenging situations. Contact your local community
council and ask if there a safe location identified for your community.
Once you have chosen your safe meeting place, make sure each member of
your family and your emergency friends know where you plan to meet in case
communications fail during the emergency situation.
Safe Meeting Place
(near home)
................................................
Safe Meeting Place
(away from home)
...............................................
You should take a note of other contact numbers that could come in handy, for
example, when there is no access to the internet:
Page 175

Page 176

We recommend that you find out how
to turn off your gas, electricity and
water supplies to your home. Here is
some practical advice to follow:
• Gas
On smelling gas, open a window
if you can and leave the property
immediately. Call the National Gas
Emergency Service immediately (0800
111 999). Do not smoke or use any
naked flames until you’re sure there
is no leaking gas present. Do not turn
electrical switches on or off.
• Electricity
You can turn off the electricity to your
home by tripping the main switch in
your fuse box. You may need to do this
if a flood is imminent.
• Water
The location of the stop valve will vary,
but are most commonly found under
a sink (kitchen or utility room), in a
garage or close to the hot water system
(wherever the mains supply enters your
house). Call a licensed plumber if you
are in any doubt about what to do.
Contact Moray Council, emergency
services or utility providers if you see
any hazards that could be considered
dangerous to the public.
When returning to your home after
an emergency, you should be aware
of additional hazards created by the
incident. For example:
• If there is debris - check the
exterior of the property for cracks.
If any part of the building looks
unstable leave immediately.
Debris can be dangerous so wear
protective clothing and footwear.
• If electrical appliances have
been wet - turn off the electricity
at the fuse box, allow appliances
to dry out and have a qualified
professional check them before
turning them back on.
• If your water is discoloured,
cloudy or smells - check with your
water supply company before
drinking or using water as it may
be contaminated.
Call your insurance provider – take
pictures of any damage which has
occurred and keep records of repairs
and cleaning costs, as this may help
any insurance claims.
In your home
Page 176

Page 177

Priority Services Registers (PSR)
provide vital services for people in
vulnerable situations across Scotland.
For example, you are eligible for free
PSR Services if you’re: blind or partially
sighted, deaf or hard of hearing, use
medical equipment reliant on electricity
or water, disabled, live with children
under five, over 60 or temporarily need
extra support.
Registering will help make sure
customers who need more help know
what support is available to them. It
also informs service providers where
to prioritise in an emergency, for
example Scottish and Southern Energy
Networks.
You should encourage everyone to
have a look and see if they or someone
they know might be eligible.
psrscotland.com
SSEN Distribution
0800 294 3259
Scottish Water
0800 0778 778
Stay informed
Priority service registers
•Weather: Sign up to receive weather
warnings directly from the Met Office.
You can also download their app to
receive alert notifications for where you
are.
•Traffic: If you’re travelling by road,
Traffic Scotland hosts an interactive
map, providing information on all
incidents, roadworks, travel warnings
and more on Scotland’s major roads.
•Flooding: You can sign up for live
flood information with SEPA Floodline.
Together with the Met Office, they
also provide a Flood Forecast map
that shows any anticipated flooding in
Scotland for the next three days.
Moray Council also share live updates
from blue light services. For information
relevant to Moray, follow Moray
Council’s social media pages
(@MorayCouncil) and sign up for
alerts from the Service Status Portal.Page 177

Page 178

Emergency Services: 999
Non-Emergency: 101
NHS 24: 111
Loss of Power: 105
Gas Emergency: 0800 111 999
Scottish Water: 0800 077 8778
Floodline Scotland: 0345 988 1188
Moray Council Contact Centre: 0300 123 4561
Moray Council (Out of Hours): 0345 7565 656
For more information,
or to request an
alternative language
format, follow the QR
code link to Moray
Page 178