Economic Development and Infrastructure Services
Committee 
Tuesday, 20 June 2023 
NOTICE IS HEREBY GIVEN that a Meeting of the Economic Development and
Infrastructure Services Committee is to be held at Council Chambers, Council
Office, High Street, Elgin, IV30 1BX on Tuesday, 20 June 2023 at 09:30. 
BUSINESS 
1 Sederunt 
2 Declaration of Group Decisions and Members Interests * 
3 Minute of Meeting dated 2 May 2023   7 - 18
4 Written Questions ** 
5 Core Paths Action Plan 2023-2026
Report by Depute Chief Executive (Economy, Environment and
Finance)  
19 -
406
6 A940 Grantown Road Forres Traffic Regulation Order for
Extension and Amendment of Speed Limit
A report by Depute Chief Executive (Economy, Environment and
Finance)  
407 -
418
7 Pavement Parking Proposed Exemption Order
A report by Depute Chief Executive (Economy, Environment and
Finance)  
419 -
440
Page 1

Page 2

8 Electric Vehicle Infrastructure Fund Strategy and
Explansion Plan - Pathfinder Project Update
Report by Depute Chief Executive (Economy, Environment and
Finance)  
441 -
446
9 Performance Report (Environmental and Commercial
Services) Period to 31 March 2023
Report by Depute Chief Executive (Economy, Environment and
Finance)  
447 -
454
10 Performance Report (Economic Growth and
Development Services) Period to March 2023
Report by Depute Chief Executive (Economy, Environment and
Finance)  
455 -
460
11 Moray Community Wealth Building Strategy and Action
Plan
Report by Depute Chief Executive (Economy, Environment and
Finance)  
461 -
508
12 External Grant Funding Updates
Report by Depute Chief Executive (Economy, Environment and
Finance)  
509 -
532
13 Depot and Store Review
Report by Depute Chief Executive (Economy, Environment and
Finance)  
533 -
538
14 Information Reports - if called in 
15 Question Time ***
Consider any oral question on matters delegated to the Committee in
terms of the Council's Scheme of Administration. 
Page 2

Page 3

Information Report - List of Property Transactions
concluded under Delegated Powers
Report by Depute Chief Executive (Economy, Environment and
Finance)  
539 -
548 
Summary of Economic Development and Infrastructure
Services Committee functions:
Roads Authority; Lighting Authority, Reservoirs Act 1975, Public
Passenger Transport; Flood Prevention; Twinning; Piers and Harbours
and Coast Protection; Industrial and Commercial Development;
Environmental Protection; Burial Grounds; Assistance to Industry or
Commerce; Public Conveniences; Council Transportation; Catering &
Cleaning; Land Reform (Scotland) Act 2003; Countryside Amenities;
Tourism, monitoring funding from European Programmes, youth
training and employment creation scheme and provide Architectural,
Quantity Surveying, Maintenance and Allied Property Services.     
Page 3

Page 4

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how
the individual or members of the group will vote on any item(s) of business on
the Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any
relevant and competent business within the specified remits not already on the
agenda, to the Chair provided it is received by the Proper Officer or Committee
Services by 12 noon two working days prior to the day of the meeting.  A copy
of any written answer provided by the Chair will be tabled at the start of the
relevant section of the meeting.  The Member who has put the question may,
after the answer has been given, ask one supplementary question directly
related to the subject matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the
consent of the Chair. If a Member does not have the opportunity to put a
supplementary question because no time remains, then he or she can submit it
in writing to the Proper Officer who will arrange for a written answer to be
provided within 7 working days. 
*** Question Time - At each ordinary meeting of the Committee ten minutes will be
allowed for Members questions when any Member of the Committee can put a
question to the Chair on any business within the remit of that Section of the
Committee.  The Member who has put the question may, after the answer has
been given, ask one supplementary question directly related to the subject
matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than ten minutes
after the Committee has started on the relevant item of business, except with
the consent of the Chair.  If a Member does not have the opportunity to put a
supplementary question because no time remains, then he/she can submit it in
writing to the proper officer who will arrange for a written answer to be provided
within seven working days. 
Page 4

Page 5

THE MORAY COUNCIL 
Economic Development and Infrastructure Services
Committee 
SEDERUNT 
Councillor Marc Macrae  (Chair)
Councillor Amber Dunbar  (Depute Chair)  
Councillor Peter Bloomfield  (Member)
Councillor John Cowe  (Member)
Councillor John Divers  (Member)
Councillor David Gordon  (Member)
Councillor Juli Harris  (Member)
Councillor Sandy Keith  (Member)
Councillor Graham Leadbitter  (Member)
Councillor Paul McBain  (Member)
Councillor Shona Morrison  (Member)
Councillor John Stuart  (Member)
Councillor Draeyk Van Der Horn  (Member)
Councillor Sonya Warren  (Member)  
Clerk Name: Lissa Rowan
Clerk Telephone: 07765 741754
Clerk Email: committee.services@moray.gov.uk 
Page 5

Page 6

Page 6

Page 7

MORAY COUNCIL 
Minute of Meeting of the Economic Development and Infrastructure Services
Committee 
Tuesday, 02 May 2023 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor Peter Bloomfield, Councillor John Cowe, Councillor John Divers,
Councillor Amber Dunbar, Councillor David Gordon, Councillor Juli Harris,
Councillor Sandy Keith, Councillor Graham Leadbitter, Councillor Marc Macrae,
Councillor Paul McBain, Councillor Shona Morrison, Councillor John Stuart,
Councillor Draeyk Van Der Horn, Councillor Sonya Warren 
IN ATTENDANCE 
Depute Chief Executive (Economy, Environment and Finance), Head of
Environmental and Commercial Services, Head of Housing and Property, Roads
Maintenance Manager, Mrs D Anderson, Senior Engineer (Transportation),
Consultancy Manager, Principal Climate Change Strategy Officer, Mr C Muir,
Senior Officer (Economic Strategy and Development), Mr W Burnish, Senior
Engineer (Flood Risk Management), Ms S Creswell, Community Wealth Building
Officer, Legal Services Manager and Mrs L Rowan, Committee Services Officer as
Clerk to the Committee.   
1         Chair 
Councillor Macrae, being Chair of the Economic Development and Infrastructure
Services Committee, chaired the meeting.   
2         Declaration of Group Decisions and Members Interests 
In terms of Standing Order 21 and the Councillors’ Code of Conduct, there were no
declarations from Group Leaders or Spokespersons in regard to any prior
decisions taken on how Members will vote on any item on the agenda or any
declarations of Member’s interests in respect of any item on the agenda. 
3         Condolences 
The Committee joined the Chair in expressing its sadness and condolence to the
family of Stephen Cooper, former Head of Environmental and Commercial
Services, following his recent passing and acknowledged that Stephen would be
sadly missed by many.  
The Committee joined the Chair in expressing further condolence to the family of
Colin Lipscomb following his recent passing.  Colin had been a member of Forres
Community Council, Forres Hub, Forres Rotary and would be sadly missed by
many.
Item 3
Page 7

Page 8

4         Minute of Meeting dated 7 February 2023 
The minute of the meeting of the Economic Development and Infrastructure
Services Committee dated 7 February 2023 was submitted and approved. 
5         Written Questions 
The Committee agreed to note the following Written Question submitted by
Councillor Fernandes and subsequent Council response:  
Committee welcomes the Scottish Government’s £939,000 capital allocation for
the period 2023-2026 to refurbish play parks in Moray. This funding comes in
addition to the £186,000 allocated between 2021 and 2023.  
How is the additional funding from the Scottish Government being used, and what
consideration is given to making play parks accessible for disabled children? What
consideration is given to refurbishing play parks all across Moray?  
RESPONSE  
The Scottish Government’s Play Area Renewal capital funding is used to deliver a
prioritised refurbishment programme of Council maintained play areas across
Moray.  
The programme is informed by an independent annual inspection of all play areas
across Moray which includes a condition scoring exercise.  The lowest scoring
parks are prioritised each year for refurbishment.  
Working within the Open Space team’s resources we aim to refurbish at least two
play areas per financial year.  The team works collaboratively with the Council’s
Community Support Unit and uses a participatory budgeting (PB) approach to
allow the local community to be meaningfully engaged in each project, including
influencing the design and brief for tendering, and in selecting the final design and
contractor.  The PB process is not about where the money is spent but on how the
money is spent in a specific play area. 
All new play areas tenders require that some inclusive equipment, including
equipment suitable for those with hidden disabilities, is included in each project.
The levels of inclusivity, accessibility and wheelchair friendly equipment is
determined by both site constraints and by the community consultation
results.  The designs submitted by companies are put out to a public vote and the
one with the most votes is selected.  
The 2023/24 programme is currently underway and includes Mannachie Play Area,
(Forres); Netherha Play Area (Buckie) and Tomnavoulin Play Area
(Speyside).  Subject to the costs for each upgrade, any surplus funding is used to
support any other equipment repairs prioritised at other play areas, including
surfacing or ground works. 
6         Notice of Motion - Whisky duty - Councillors Harris and Warren 
In terms of Standing Order 35(a), a Notice of Motion was submitted by Councillor
Harris, seconded by Councillor Warren in the following terms:
Page 8

Page 9

Committee notes that the UK Government's Spring Budget 2023 includes a 10.1%
increase on spirits duty. 
Committee further notes that the Scottish Whisky Association has described the
increase as a “historic blow to the Scotch whisky industry” that will “reduce already
tight margins for an industry that employs tens of thousands of people and invests
hundreds of millions annually across the UK”, and that Moray MP said that the
increase is “a blow to the industry which is so vital for jobs and the local economy
in Moray”.  
Committee recognises that the Scottish Whisky Association suggests that the duty
increase will limit the industry’s ability to reinvest in job creation.  
Committee recognises that roughly 50 percent of Scotland's whisky is produced in
Speyside, and that the duty increase will therefore disproportionately negatively
impact Moray’s job market.  
Committee instructs the Chair of the Economic Development and Infrastructure to
write to the Chancellor asking that the duty on spirits be reduced as a matter of
urgency.  
The Chair supported the Notice of Motion and stated that the local MP and
Secretary of State for Scotland have expressed their concern over this issue and
asked Councillors Harris and Warren, as proposer and seconder of the motion, if
they would consider including that he write to the Secretary of State as well as the
Chancellor.  
Both Councillors Harris and Warren agreed to this.  
Councillor Keith expressed his support for the motion however noted the Scottish
Government’s current proposals to restrict alcohol advertising and asked if
Councillors Harris and Warren, as proposer and seconder of the motion, if they
would consider adding that the Chair of the Economic Development and
Infrastructure Services Committee also write to the Scottish Government asking
that they withdraw current proposals to restrict alcohol advertising as a matter of
urgency.  
Councillor Leadbitter pointed out that the First Minister had recently announced in
a statement to parliament 2 weeks ago in relation to any restriction on alcohol
advertising that he had instructed officials to take ideas back to the drawing board
and work with the industry and public stakeholders to agree a new set of
proposals.  
Councillor Keith stated that he was not aware of this recent announcement and
after consideration agreed to withdraw his request for a further addition to the
Notice of Motion.  
Thereafter, the Committee agreed that the Chair of the Economic Development
and Infrastructure Services Committee write to the Chancellor and the Secretary of
State for Scotland asking that the duty on spirits be reduced as a matter of
urgency.   
Page 9

Page 10

7         Notice of Motion - The Future of Disposal Vapes - Councillors Macrae
and Van Der Horn 
In terms of Standing Order 35(a), a Notice of Motion was submitted by Councillor
Macrae, seconded by Councillor Van Der Horn in the following terms:  
That Committee understands that around 1.3 million disposable vapes are thrown
away every week in the UK, although this figure is assumed to be greatly
underestimated. As they are classed as nicotine based products primarily
designed to reduce/replace smoking habits the figures are based on surveys from
adults. Hence the figures don’t include the number of teenagers who use them,
especially as most of the disposable products are packaged and presented to
appeal to younger generations.  
A significant amount of the disposable vapes thrown away each week are not
recycled properly and are instead littered or discarded with residual waste.  
That Committee are concerned about the increasing number of these products and
their improper disposal. The 1.3 million figure represents the equivalent of 1,200
electric car batteries or 10 tonnes of lithium – which is being sent to landfill or
waste incinerators each year.  
Committee notes that the country that produces the bulk of these products (China)
has totally banned the sale and use of these disposable vapes. This is also the
case in some European countries.  
Vapes do fall under the current WEEE regulations both in England and Scotland,
and should be disposed of correctly as any other electrical item. The
Producer/Retailer responsibilities also apply, and each retailer of electrical
equipment should either:  
1.         Provide a free, in store take back service
2.         Set up an alternative free take back service
3.         Join the distributor Takeback Scheme  
However, as disposable vapes are now sold in many different outlets such as
newsagents, cafes and hairdressers, these retailers are probably not fully aware of
their responsibilities and most certainly don’t comply with/promote take back
schemes or even ‘How to dispose of’ information. As a result we are seeing more
of these items disposed of as litter and they are becoming the new ‘cigarette butt’
alternative. 
Committee asks that the Council Leader write to both the Scottish and UK
Governments calling for a ban on the sale and manufacture of disposable vapes
as soon as possible.  
After introducing his Notice of Motion, the Chair called upon Councillor Van Der
Horn, as seconder to make any further comment.  
Councillor Van Der Horn wholly supported the motion however asked that the
Chair consider an addition to the motion asking the Council Leader to call on
retailers in Moray to take a lead and cease sales of disposable vapes. 
In response, Councillor Macrae pointed out that whilst the Council could not
propose such a regulation, the Council Leader could ask retailers to consider
Page 10

Page 11

reviewing the sales of their disposable vapes and agreed to include this in his
motion.  
Councillor Dunbar, whilst not opposing the motion, stated that she could not
support a complete ban of vapes however suggested that young people would
benefit from further education surrounding the effects of vaping on health and the
environment, much like that given for smoking, drugs and alcohol use.  
Following further discussion and there being no-one otherwise minded, the
Committee agreed to ask that the Council Leader write to both the Scottish and UK
Governments calling for a ban on the sale and manufacture of disposable vapes
as soon as possible and that the Council Leader also calls on retailers in Moray to
take a lead and cease sales of disposable vapes. 
8         Economy, Environment and Finance Service Plans 2023-24 
Under reference to paragraph 15 of the Minute of the meeting of Moray Council
dated 2 February 2023, a report by the Depute Chief Executive (Economy,
Environment and Finance) invited the Committee to consider the Economy,
Environment and Finance Service Plans for 2023-24, noting that the Service Plan
for Financial Services will be considered at Corporate Committee on 13 June
2023, the Economic Growth and Development Services Plan will also be
considered at the Planning and Regulatory Services Committee on 30 May 2023
and the Housing and Property Services Plan at the Housing and Community
Safety Committee on 9 May 2023, each in terms of their respective remits.  
Following consideration and in terms of the remit of this Committee, it was agreed
to approve the Service Plans for Economic Growth and Development, Housing and
Property Services and Environmental and Commercial Services as set out in
Appendices 1-3 of the report.    
9         Economic Recovery Plan Delivery 2022-23 
Under reference to paragraph 9 of the Minute of the meeting of the Economic
Growth, Housing and Environmental Sustainability Committee dated 6 October
2020, a report by the Depute Chief Executive (Economy, Environment and
Finance) provided the Committee with an overview of economic development
activity delivered during the 2022/23 financial year, as set out within the Economic
Recovery Plan.  
Following consideration, the Committee: 
(i) acknowledged the positive impact of the Economic Recovery Plan in
minimising the negative effects of the pandemic upon the local economy; and 
(ii) agreed that this be accepted as the final report covering the delivery of the
Economic Recovery Plan. 
10         Climate Change Plan and Route Map to Net Zero 
Under reference to paragraph 18 of the Minute of the meeting of Moray Council
dated 6 April 2022, a report by the Depute Chief Executive (Economy,
Page 11

Page 12

Environment and Finance) asked the Committee to approve the update to the
Route Map to Net Zero (RMNZ), approve in principle an updated climate change
action plan subject to consideration as part of the financial planning process,
approve a climate change engagement strategy and note progress with the actions
approved within the Climate Change Strategy (CCS) for 2020-2030.  
Following consideration, the Committee agreed to:  
(i) approve the updated RMNZ as set out in Appendix 1, the updated Climate
Change Actions set out in Appendix 2, and the Climate Change
Engagement Strategy set out in Appendix 3 of the report; 
(ii) note that, while the latest data available indicates that 2030 remains in the
range of possible dates when net zero will be met, to ensure this is
achieved the Council must commit to an aspirational approach to reducing
carbon emissions in key areas but that the ability to implement such an
approach is currently questionable without significant external funding; and 
(iii) note the ongoing budget pressure arising from statutory climate change
measures, as set out in section 1.2 of Appendix 1 of the report, for which
external funding is essential.    
11         Lossiemouth to Hopeman Active Travel Route 
A report by the Depute Chief Executive (Economy, Environment and Finance)
informed the Committee of the activity being undertaken by the Laich of Moray
Active Travel Routes group (LoMATR), who are part of the Lossiemouth
Community Development Trust (LCDT), to secure a new Active Travel Route
(ATR) between Lossiemouth and Hopeman.  
As one of the Local Ward Members, Councillor Cowe explained that the creation of
an active travel path between Lossiemouth and Hopeman is a long standing
ambition of the Community and Moray Council and provided an update in relation
to funding that had been secured by the LCDT and highlighted problems that the
LoMATR group were having in relation to obtaining appropriate land permission to
take the project forward.  Councillor Cowe explained the high demand for the route
due to a lack of public transport between Hopeman and Lossiemouth and stated
that the provision of this route would align with the objectives of the Council's
Active Travel Strategy.  Councillor Cowe further stated that whilst Sustrans Places
for Everyone grant could provide funding for the path itself, ongoing maintenance
of the route would need to be provided by the Council however due to the high
specification and design life of the route and the low impact of active travel on
infrastructure, constructive maintenance requirements are expected to be minimal
for many years with maintenance likely to comprise of vegetation cut back.  
In response, the Head of Environmental and Commercial Services explained that
once a route was adopted by the Council then there was a legal requirement to
maintain it and that this would come at a cost to the Council.  She further advised
that although the Council had approved its Active Travel Strategy, there were other
existing routes that required investment and that, should the Council adopt the
route between Hopeman and Lossiemouth as a priority, then another route which
has scored higher in terms of priority, would have to slip and, having spoken to the
Section 95 Officer, this was not considered to be financially prudent.  
Page 12

Page 13

The Legal Adviser further advised that the Council had agreed its priorities
however these had to be delivered against a finite resource in terms of money,
staff and time.  
The Chair, having considered the report in detail moved the recommendations as
printed within the report.  This was seconded by Councillor Bloomfield.  
Councillor Cowe stated that he was well aware of the financial position of the
Council and stressed that he was not asking the Council to commit to spending
any money at this time but only if necessary at a later date which he hoped would
be covered by the Scottish Government’s pledge of £300 million towards active
travel routes by 2025.  He stated that the LoMATR group needed assistance from
the Council to address problems in relation to land ownership and ongoing
maintenance of the route and moved that the Committee agree to
note recommendation 2.1 (i) as printed, agree recommendation 2.1 (ii) sections 1,
2, 3 and 5 of the criteria set out in paragraph 6.2 and agree recommendation 2.1
(iii) section 1, 2, 3 and 5 with staffing resources committed as required to deliver
the project.  
At this point, the Legal Adviser advised that, the Section 95 Officer had advised
that, in her view, committing the Council to this project at this stage would be
fiscally reckless and that the Committee should note the warning in the financial
implications section of the report when making a decision and also have regard to
the detail in the report which confirmed officers did not have capacity to take this
project on.  
After considering the advice from the Legal Adviser, there was no seconder for
Councillor Cowe's amendment therefore it fell.  
There being no-one otherwise minded, the Committee agreed:  
(i) to note the activity undertaken by the Laich of Moray Active Travel Routes
group to develop and seek funding for an Active Travel Route between
Lossiemouth and Hopeman; 
(ii) the criteria set out in para 6.2 of the report that must be met by the group if
Moray Council is to pursue a Compulsory Purchase Order (CPO) or use
path designation powers; and 
(iii) that until the criteria identified in para 6.2 has been met, support for this
project by Council officers be limited to the on-going provision of advice and
information, in keeping with the current level of support.    
12         Council Policy - Bridge Maintenance Prioritisation 
A report by the Depute Chief Executive (Economy, Environment and Finance)
informed the Committee of the proposed Council Policy relating to prioritisation of
bridge maintenance works, which will formalise the existing prioritisation process.  
Following consideration, the Committee agreed to endorse the Council Policy as
set out in paragraphs 3.4 to 3.11 of the report in relation to prioritisation of bridge
maintenance works.    
Page 13

Page 14

13         Roads Maintenance Revenue and Capital Budget 2023-2024 
Under reference to paragraph 5 of the Minute of the meeting of Moray Council
dated 1 March 2023, a report by the Depute Chief Executive (Economy,
Environment and Finance) asked the Committee to note the interim outturn
position for 2022/23 and approve detailed plans for the expenditure of funds
allocated from the Revenue Budget 2023/24 to Roads Maintenance and from the
Capital Budget 2023/24 including resurface/reconstruction, surface dressing,
footways, drainage, lighting column replacement and lighting improvements.  
Following consideration, the Committee agreed to:  
(i) approve the detailed allocation of funds, from the Revenue and Capital
Budget 2023/24, to Roads Maintenance activities, as outlined in Section 5
of the report; 
(ii) grant delegated authority to the Roads Maintenance Manager to proceed
with necessary roads maintenance works whilst noting that the Roads
Maintenance Manager will, as soon as possible, publish a main list of
schemes, which can be funded from the budget provision recommended in
this report, and a reserve list of desirable schemes, which cannot presently
be funded, along with a list of projects to be funded from the Capital
allocation; and 
(iii) note that the list of schemes will be drawn up in accordance with the
principles and objectives detailed in this report, in the Roads Asset
Management Plan and in the Capital Plan.   
14         Flood Risk Management and Bridges Capital and Revenue Budgets
2023-24 
A report by the Depute Chief Executive (Economy, Environment and Finance)
informed the Committee of the Flood Risk Management Schedule of Clearance
and Repair for 2023/24, the Bridge Maintenance Schedule of Works and the
programme of Capital works for Bridges for 2023/24.  
Following consideration, the Committee agreed the:  
(i) Flood Risk Management Schedule of Clearance and Repair for 2023/24;
and 
(ii) proposed Schedules of Road Bridge Revenue and Capital Maintenance
Works and Non-network Bridge Capital Maintenance Works to be
undertaken for 2023/24.    
15         Suspension of Standing Orders 
The Chair sought the agreement of the Committee to suspend Standing Order 75
to allow the meeting to continue beyond 12.45 pm.  This was agreed. 
16         Transportation Capital and Revenue Budgets 2023-2024 
Page 14

Page 15

A report by the Depute Chief Executive (Economy, Environment and Finance)
informed the Committee of plans to deliver the capital and revenue programme in
Transportation for 2023/24.  
Following consideration, the Committee agreed to:  
(i) approve the plans to deliver the capital and revenue programme for 2023/24
as contained in the report; 
(ii) delegate authority to the Head of Environmental and Commercial Services
to apply for grants for the funding areas set out in the report at paras 5.13
and 6.16; and 
(iii) approve the plans for expenditure of the additional revenue funding for
Road Safety as set out in para 7.6 of the report.    
17         Resumption of Meeting 
PRESENT 
Councillor Peter Bloomfield, Councillor John Cowe, Councillor John Divers,
Councillor Amber Dunbar, Councillor David Gordon, Councillor Juli Harris,
Councillor Sandy Keith, Councillor Graham Leadbitter, Councillor Marc Macrae,
Councillor Paul McBain, Councillor Shona Morrison, Councillor John Stuart,
Councillor Draeyk Van Der Horn, Councillor Sonya Warren. 
18         Environmental and Commercial Services and Economic Development
Capital and Revenue Budget Monitoring to 31 December 2022 
Under reference to paragraph 11 of the meeting of Moray Council dated 7
December 2022, a report by the Depute Chief Executive (Economy, Environment
and Finance) informed the Committee of the current position regarding
Environmental and Commercial Services and Economic Growth and Development
Services (Economic Development) Capital and Revenue Budgets.  
During discussion surrounding poor responses to tender requests, it was queried
whether the Council could assist in any way as it was noted that some businesses
out with Moray had bid for tenders and then realised they could not undertake the
work and assurance was sought that the tendering process is clear for businesses.  
In response, the Depute Chief Executive (Economy, Environment and Finance)
stated that work occurs annually with local businesses to ensure that they fully
understand the tendering process however agreed to liaise with the Procurement
Manager to ensure that suppliers out with Moray are fully aware of the
requirements within the tendering process.   
Following consideration, the Committee agreed:  
(i) to note the budget monitoring report for the period to 31 December 2022;
and 
Page 15

Page 16

(ii) that the Depute Chief Executive (Economy, Environment and Finance)
would liaise with the Procurement Manager to ensure that suppliers out with
Moray are fully aware of the requirements within the tendering process.   
19         Marine Safety and Operational Summary of 2022-23 Updates Q4 2022-
2023 
Under reference to paragraph 6 of the Minute of the meeting of this Committee
dated 20 March 2018, a report by the Depute Chief Executive (Economy,
Environment and Finance) informed the Committee on matters of Marine Safety
and compliance with the Port Marine Safety Code (PMSC) for the year 2022/23
and details of Q4 202/23.  
The Committee joined the Chair in commending the Harbours Team for the
improvements made in this area and thereafter the Committee agreed to:  
(i) note the safety performance, fulfilling their function as Duty Holder under
the Port Marine Safety Code; and 
(ii) amend the reporting requirement from quarterly to 6-monthly as set out in
para 6.2 of the report.    
20         Nature and Biodiversity Position Statement 
Under reference to paragraph 9 of the Minute of the meeting of Moray Council
dated 2 February 2023, a report by the Depute Chief Executive (Economy,
Environment and Finance) informed the Committee of how existing Council
strategies and actions align with national and international biodiversity policy and
sought approval for continuing support for the North East Biodiversity Partnership
for the next 3 years.  
Following consideration, the Committee agreed:  
(i) to note how existing council policies, strategies and action align with the
Global Biodiversity Framework and Scottish Biodiversity Strategy; 
(ii) to note the opportunities and challenges involved in delivering the council’s
statutory duty to further the conservation of biodiversity; 
(iii) to approve continued support for the North East Scotland Biodiversity
Partnership for next three years; 
(iv) to add the biodiversity actions highlighted in Appendix 1 of the report to the
Climate Change Plan and Route Map to Net Zero; and 
(v) that the actions identified within the report form the basis of a Moray
biodiversity strategy to be reported in 2024 setting out priority actions for
nature recovery in Moray in accordance with the limitations set out in para
5.12 of the report.    
21         North Highland and Moray Space Cluster Strategy 
Page 16

Page 17

Under reference to paragraph 30 of the Minute of the meeting of Moray Council
dated 15 September 2021, a report by the Depute Chief Executive (Economy,
Environment and Finance) presented the Committee with an overview of the North
Highland and Moray Space Cluster Strategy, set out in Appendix 1 of the report
and sought approval to support Highlands and Islands Enterprise (HIE) in the
implementation of the strategy which may include providing staff resource from
Economic Growth and Regeneration section to support economic development
opportunities related to the development of the Moray Space Cluster. 
Following consideration, the Committee joined the Chair in commending the work
of Roy Kirk who had been the project manager for the space port project and key
officer with regard to space projects within the Highlands and Islands, who will be
retiring shortly and thereafter agreed to:  
(i) note the current developments and future ambitions for the North Highland
and Moray Space Cluster; and 
(ii) the commitment of staff resource within Economic Growth and
Regeneration section to provide ad hoc support to HIE in the
implementation of the Moray Space Cluster Development Strategy. 
22         Information Reports - if called in 
The Committee noted that no Information Reports had been called in for
discussion.   
23         Question Time 
Under reference to paragraph 19 of the Minute of this Committee dated 7 February
2023, Councillor Warren welcomed the launch of the m.connect bus service and
app however queried how elderly people are being made aware of the service and
supported to use the app.  
The Head of Environmental and Commercial Services assured Councillor Warren
that whilst the Service was moving towards a digital platform, members of the
public could still book the service via telephone.  She further stated that the Project
Manager had recently met with Age Scotland and provided further details on the
service and that paper bus timetables were being made available to coincide with
the launch.  
Under reference to paragraph 7 of the Minute of this Committee dated 7 February
2023, the Chair stated that the Rt Hon Michael Gove MP was still keen to come to
Moray to discuss the next round of Levelling Up Funding and that Dehenna
Davidson MP, Minister for Levelling Up was also keen to visit Moray to assist with
the next round of funding.  
Councillor Warren stated that she had been at a recent meeting of the North East
of Scotland Fisheries Development Partnership where seaweed cultivation had
been discussed and queried whether any work was being carried out to attract
funding so that this can be developed in Moray.  
In response, the Head of Environmental and Commercial Services advised that
she would pass this query to the Head of Economic Growth and Development for a
Page 17

Page 18

response however assured the Committee that Harbours in Moray are willing to
discuss any means available to support this.  
Under reference to Appendix II of the Information Report: List of Property
Transactions concluded under Delegated Powers, Councillor Van Der Horn noted
that Keith Golf Course was 22 Ha and Transition Town Forres was 1.2 Ha yet
there was a considerable difference in rent per Ha and asked how this was
calculated.  
In response, the Depute Chief Executive (Economy, Environment and Finance)
advised that this was calculated by the Estates Service and that she would look
into this further and circulate this information to the Committee after the meeting.  
Councillor Warren noted that CCTV was up and running in Forres and queried
when it would be available in Buckie, Keith and Lossiemouth.  
In response, the Depute Chief Executive (Economy, Environment and Finance)
advised that she would look into this further and circulate this information to the
Committee after the meeting.     
Page 18

Page 19

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 20 JUNE 2023 
SUBJECT: CORE PATHS ACTION PLAN 2023 - 2026 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the formulation of the Core Paths Action Plan
2023 – 2026, in partnership with the Moray Local Outdoor Access Forum
(MLOAF), which includes the use of the funding to employ a Core Paths
Ranger for a period of 27 months commencing October 2023. 
1.2 This report is submitted to Committee in terms of Section III (F) (7) of the
Council’s Scheme of Administration relating to exercising the statutory
functions of the Council under the Land Reform (Scotland) Act 2003. 
2. RECOMMENDATION 
2.1 It is recommended the Committee agree: 
i) the proposals and outputs as contained in the attached Moray
Core Paths Action Plan 2023-2026 and associated Appendices;
and 
ii)  the employment of a Core Paths Ranger to implement the Plan for
a period of 27 months commencing October 2023. 
3. BACKGROUND 
3.1   In 2016 an Access Management Strategy was prepared for the Dorenell Wind 
Farm as a result of a condition applied to the planning consent.  The Strategy
was produced by developer EDF Energy in consultation with the Moray
Council Access Manager and The Moray Local Outdoor Access Forum.  A
major output of this Strategy is a commitment by EDF Energy to an annual
contribution to the Moray Council of £50k per annum (£1.25m for the 25 year
life span of the wind farm).  This is to be used by the Council solely for the
development and management of the Core Paths Network across the whole
of Moray identified in the Moray Core Paths Plan.  This equates to a sizeable
sum of money and it is important to carefully consider how this resource
Item 5
Page 19

Page 20

should be used in a planned way rather than just being reactive to immediate
demands and desires arising at any given time. 
3.2 This Committee on 21January 2020 agreed a Strategic Framework Document
as the blueprint for the range of outputs and activities on which the £50k
annual Dorenell Windfarm financial contribution for Moray’s Core Paths can
be spent over the next 25 years until 2044 (para 8 of the minute
refers).Committee also agreed to the preparation of a 3 year rolling prioritised
Action Plan to be submitted to a future meeting for approval. The attached
Core Paths Action Plan 2023-2026 and the associated three Appendices is
set out at Appendix 1 to this report, and has been prepared as the first
document in response to that instruction. The total available budget over the
period is £188k. 
4.   Core Paths Action Plan 
4.1 This Action Plan covers how the Dorenell Contribution should be spent over
the next 3 financial years 2023-2026. The results of an audit of all of the Core
Paths recently carried out have advised on the condition of features on each
of the paths informing what specific issues and defects need to be addressed. 
4.2 The Plan has been prepared in conjunction with the Moray Local Outdoor
Access Forum (MLOAF) which is a statutory body set up under the access
legislation to provide a view on a wide range of matters relating to outdoor
access and to advise the Council on its statutory access duties including Core
Paths. Specifically for this Action Plan the Forum have worked in partnership
with the Council, particularly in relation to the process for selecting the priority
Core Paths to be taken forward for treatment. 
4.3 The key objective is to make every prioritised Core Path as accessible as
possible. The most effective way to achieve this in a way that spreads
resources is to implement small scale works across the network rather than
limit operations to expensive projects in a few locations. Most of these works
do not require owner consent and this limits future liability for the Council in
maintenance as set out in the rolling plan. This also maximises benefits
across the whole of Moray.  This approach was agreed as part of the
Strategic Framework document already agreed by this Committee on 21
January 2020 (para 8 of the minute refers). Work will focus on addressing
deteriorating paths due to current poor/non-existent maintenance and
improvements needed to remove barriers to accessibility.  Work will primarily
be ‘light touch’ rather than large scale engineering to minimise any negative
impacts on the environment. 
4.4  The Core Paths Action Plan also dovetails with the The Strategic Tourism
Infrastructure Development Plan, Moray Routes: Bright Futures which was
agreed at the ED&IS Committee on 7 February 2023 (para 16 of the minute
refers). The Plan, funded through the Rural Tourism Infrastructure Fund
(RTIF), identifies projects to enhance the six long distance walking/ active
travel routes in rural Moray i.e. Moray Way, Speyside Way, Dava Way, Moray
Coast Trail, Rothes Way and Isla Way. This would be targeted towards
delivery of significant long term benefits to the visitor experience, positively
impacting the visitor economy and the local landscape, whilst also indirectly
Page 20

Page 21

supporting the Moray Council Active Travel Strategy. These projects if
developed in the next few years would resolve many of the issues already
recorded along these Core Paths in the audit for the Core Paths Action Plan.
The key factor here is to hold on any improvements on these Core Paths until
a clearer picture emerges of funding and development timescales for the
implementation of the identified RTIF projects. 
4.5 All of Moray’s Core Paths have been scored against a range of selection
criteria, already agreed at the above mentioned Committee on 21 January
2020, where the higher the aggregate score the greater priority is given to the
path. The Core Path scorings are shown for each path in Appendix 2 of the
attached Action Plan. All scorings were carried out in conjunction with the
MLOAF. 
4.6 Works will only be carried out on paths prioritised through the selection
process outlined above and detailed in Section 5 of the attached Action Plan.
Appendix 3 of the Plan lists the paths ranked by aggregate scorings; all the 78
Core Paths highlighted in red are the selected prioritised paths which are
candidates to be improved, 159 amber paths being optional and 121 green
paths definitely not prioritised. The scoring cut off points between the 3
categories have been agreed with MLOAF. 
4.7 The most effective and efficient way to implement the required Core Path
improvements is to establish a new fixed-term post to physically carry out
improvements and to co-ordinate overall effort. This is because the disparate
and fragmented nature of the works at multiple locations spread across the
whole of the paths network means that external contractors would likely be
less interested in securing the work and in any case existing Council staff
would still have to co-ordinate overall effort. Additionally currently there is
considerable market volatility and difficulty in securing contractors for this type
of work.  It is proposed to create the fixed term post of Core Paths Ranger
working as part of the Moray Council Open Space Team. 
4.8 The Core Paths Ranger will initially plan what needs to be done (development
and maintenance schedules) for each path and will carry out the necessary
works procuring materials as required. 
4.9 It is intended to initially employ the Core Paths Ranger from October 2023 to
December 2025 which is a period of 27 months. Any extension beyond this
period will be subject to available finances and opportunities that may arise.
The grading for the post is Grade 5 as determined by the HR Evaluation
Panel. 
4.10 A review will be carried out in 2005 which will assess the progress and
successes of the Core Paths Action Plan, what lessons can be learned and
what the following 3 year term of the Action Plan should look like.
Consideration at that stage will be given to a further Core Paths audit to give a
steer on requirements for future improvements and whether to continue
employment of the Ranger as the best way forward to facilitate Plan
implementation. 
Page 21

Page 22

5. Collaborative Approach 
5.1 It is accepted that the Ranger would only achieve a limited amount of path
improvements working on their own. It is important therefore to increase the
capacity of the Ranger to achieve more by working collaboratively where
possible with others. The emphasis will be on encouraging social inclusion
and community participation. 
5.2 The Ranger will work along the existing Moray Countryside Officer for larger
tasks. Where there is scope for joint working the Ranger will work with local
community and access groups to implement improvements; making best use
of scarce resources and facilitating added value to overall effort. The Ranger
will also liaise with the Criminal Justice Team to carry out suitable tasks.
Contractors may sometimes be procured for specialist tasks such as tree
work. 
5.3 The Ranger will work pro-actively with the Community Support Unit in setting
up a Core Paths volunteer scheme to help with the various improvement
tasks.  Promotion of the scheme will be channelled through Community
Councils and MLOAF. Training and equipment will be provided by the Council
to support the volunteers. 
5.4 The Access Manager and Core Paths Ranger will also work collaboratively
with partners in relation to paths connecting to the Highland core paths
network. 
6. Outputs 
6.1 The main outputs for the 3 year plan are summarised in the table below
primarily relating to the Core Paths Ranger who will be the committed
resource to improve/maintain the prioritised paths, manage the volunteer
scheme and deliver the signage scheme. 
The available funding to 31 March 2026 is £188k - £50k per annum for the
years 23/24, 24/25 and 25/26 plus £38k existing funding from previous years
allocation. 
Costs  2023/24 2024/25 2025/26   TOTAL
Core Paths Officer salary 13,571 27,957 21,597 63,125
Officer on costs 3,936 8,107 6,263 18,306
Vehicle hire 1,992 4,383 3,616 9,991
Fuel 780 1716 1416 3912
Computer/Tablet     500 0 0 500
Mobile Phone 255 55 55 365
PPE     300 0 0 300
Signage Scheme 5,000 5,000 5,000 15,000
Materials/Equipment/contractor
procurement
15,715 31,885 23,899 72,501
Volunteer Scheme 0 2000 2000 4000 
TOTALS 42,049 82,105 63,846 188,000 
Page 22

Page 23

7. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Ensuring people can enjoy their access rights, unimpeded and free from
obstruction, accommodating active leisure opportunities contributing to
achieving the aim of healthier citizens. 
(b) Policy and Legal
The Council have a duty to prepare a Core Paths Plan but not to
manage, develop or promote the routes. The Moray Core Paths Plan
was however agreed as Council Policy inclusive of a commitment
contained within policies in the document to make the overall network as
accessible as possible through planned improvements, management
and promotion.  The Core Paths Action Plan details how the policies
contained in the Core Paths Plan are to be implemented and the
Dorenell financial contribution provides the necessary resources for the
next 3 years. 
(c) Financial implications
The annual £50k windfall sum for Core Paths places no additional
financial burden on the Council as this has been secured from an
external source.  Risks are low with the fund constituting an additional
source of revenue allowing the Council to carry out works on Core Paths
that would not be otherwise funded from within existing Council budgets.
This funding stream cannot be used for other activity, it is ring-fenced to
the Core Path network. There is no legal obligation placed on EDF
Energy to provide this funding although this is likely to continue as it is
part of a community contribution which is standard industry practice for
windfarms. The proposals in this report will be met from the annual
contribution plus an underspend of £38,000 carried forward from
2022/23. 
(d) Risk Implications
In the event the Core Paths Action Plan is not implemented then there
will be further deterioration in the condition and accessibility of Moray’s
Core Paths Network with resultant loss of opportunities in terms of
improved health, carbon emissions reduction, social inclusion and
tourism. 
Most of the envisaged work carried on the Core Paths is likely to be
small scale maintenance, surfacing and drainage works to worn out
paths where future liability placed on the Council will be low. Such low
grade works on Core Paths do not require owner consent due to powers
given to the Council under the Land Reform (Scotland) Act 2003.
Occasionally more substantial works may be carried out to upgrade
accessibility on paths involving some structures including bridges and
culverts. In such instances where the Council do not own the path
landowner consent will be required and any agreement will address the
issue of liability on a case by case basis. 
Page 23

Page 24

(e) Staffing Implications
The delivery of the Core Paths Action Plan will be the overall
responsibility of the Moray Access Manager. Implementation of the 3
year plan will be carried out by the new Core Paths Ranger the costs for
which will be sourced from the Dorenell Core Paths fund subject to input
from HR. 
(f) Property
The Dorenell Core Paths fund will assist the Council in improving and
managing those routes which are part of the Council’s property portfolio
notwithstanding that many of the routes are in private ownership. 
(g) Equalities/Socio Economic Impact
Improvements to the Core Paths network resulting from the Dorenell
fund will improve the overall accessibility of the paths; collectively
providing for all non-motorised users, people of all genders ages and
backgrounds. All Core Paths are free to use for everyone. 
(h) Climate Change and Biodiversity Impact
The proposal helps address the climate change emergency by providing
an enhanced Core Path network that provides an alternative option to
motorised transport for travel and recreation helping to reduce
greenhouse gas emissions. 
(i) Consultations
The Depute Chief Executive (Economy, Environment & Finance), Head
of Environmental and Commercial Services; Senior Engineer
(Transportation), Roads Maintenance Manager, Sustainable Transport
Officer, Legal Services Manager, Chief Financial Officer, Equal
Opportunities Officer, Strategic Planning and Development Manager ,
Asset Manager (Commercial Buildings), Open Space Manager, Senior
Officer Economic Strategy Development, and Committee Services
Officer (L Rowan) have been consulted and their comments integrated
into the report. 
8. CONCLUSION 
8.1 The Moray Core Paths Action Plan 2023-2026 produced in conjunction
with the MLOAF, is proposed as the vehicle to improve and manage the
selected prioritised Core Paths over the next 3 years. 
8.2 A Core Paths Ranger is required to be employed for 27 months from
October 2023 to implement the Action Plan. 
Author of Report: Ian Douglas, Moray Open Space, Access and Policy
Officer 
Background Papers: Dorenell Wind Farm  – Financial Contribution to the Moray
Council for use on Moray’s Core Paths 
Page 24

Page 25

Dorenell Wind Farm Financial Contribution to the Moray
Council for use on Moray’s Core Paths – Strategic
Framework Document 2020 
Ref: SPMAN-524642768-829 
Page 25

Page 26

Page 26

Page 27

MORAY CORE PATHS
ACTION PLAN
2023 – 2026
(Including Appendix 1, 2 and 3) 
Item 5
Page 27

Page 28

1. INTRODUCTION 
In 2016 an Access Management Strategy was prepared for the Dorenell Wind Farm as a result of a
condition applied to the planning consent.  The Strategy was produced by developer EDF Energy
in consultation with the Moray Council Access Manager and The Moray Local Outdoor Access
Forum (MLOAF).  A major output of this Strategy is a commitment by EDF to an annual
contribution to the Moray Council of £50k per annum (£1.25m for the 25 year life span of the
wind farm).  This is to be used by the Council solely for the development and management of the
Core Paths Network across the whole of Moray identified in the Moray Core Paths Plan.  It can
however also be used on paths that once developed would meet the criteria to qualify for Core
Path status.  This equates to a sizable sum of money and it is important to carefully consider how
this resource should be used in a planned way rather than just being reactive to immediate
demands and desires arising at any given time. 
The first £50k was received by the council from windfarm operators EDF in June 2019 when the
facility became fully operational.  A suspense account has been set up by the council to receive
this money over the 25 year period to 2044 which will allow funds to be carried over from year to
year as required. 
The Economic Development and Infrastructure Services Committee on 21st Jan 2020 agreed a
Strategic Framework Document as the blueprint for the range of outputs and activities on which
the £50k annual Dorenell Windfarm financial contribution for Moray’s Core Paths can be spent
over the next 25 years until 2044.They also agreed to the preparation of a 3 year rolling
Prioritised Action Plan to be submitted to a future Committee for approval. This document has
been prepared in response to that instruction. 
From 2019 to 2022, as agreed by the Committee, the funds were spent on the Speyside Way
upgrading a 20.5 km section to a Paths for All accessible standard with a whin dust surface to
respect the rural nature of the route
http://www.moray.gov.uk/moray_standard/page_128861.html and developing a new Speyside
Way Website  https://www.speysideway.co.uk/.  Outputs also included Core Paths database
development and employing an officer to audit the whole Core Paths network comprising 358
paths with the audit completed by March 2023. 
This Action Plan covers how the Dorenell Contribution should be spent over the next 3 financial
years 2023-2026. The results of the audit have advised on the condition of features on each of
the paths informing what specific issues need to be addressed. 
The Plan has been prepared in consultation with MLOAF which is a statutory body set up under
the access legislation to provide a view on a wide range of matters relating to outdoor access and
to advise the Council on its statutory access duties including Core Paths. Specifically for this
Action Plan the Forum have worked in partnership with the Council particularly in relation to the
process for selecting the priority Core Paths. 
The Committee report agreed on 21st March 2020  stated that most of the envisaged work carried
out on the Core Paths are likely to be small scale surfacing and drainage works to worn out paths
where future liability placed on the Council will be low. Such low grade works on Core Paths do
not generally require owner consent. 
Page 28

Page 29

2. OBJECTIVE 
The Strategic Framework Document for spend of the Dorenell Fund has the specific aim of
ensuring that all activities and work relating to Core Paths be focussed on maximising
accessibility along the routes and providing for multi-use within the context of the natural
limitations and physical constraints of the path terrain. Inherent in this approach will be to
remove physical ‘barriers’ to access to make paths available to as wide a range of users as
possible within the limitations of scarce resources. 
3. PROPOSED OUTPUTS FOR SPEND- 2023-2026 FINANCIAL YEARS 
Available Funds
Carry over from 2022/23 - £38K
2023/24 - £50K Dorenell Contribution
2024/25 - £50K Dorenell Contribution
2025/26 - £50K Dorenell Contribution
Total 2023/26 - £188000 
Rationale and Priorities
The most effective way to spread resources and maximise benefits across Moray, to meet the
objective  of making every priority Core Path as accessible as possible, is to implement small scale
works across the network rather than limit operations to expensive projects in a few locations.
Operations will focus on addressing deteriorating paths due to current poor/non-existent
maintenance and improvements needed to remove barriers to accessibility. Work will primarily
be ‘light touch’ as opposed to large scale engineering to minimise any negative impacts on the
environment. Works will only be carried out on paths prioritised through the selection process
outlined in Section 5 of this Plan. 
What is most needed is an on the ground staff resource to carry out improvements path by path 
The most effective and efficient way to implement the required Core Path improvements is to
establish a new post to physically carry out improvements  and to co-ordinate overall effort. The
disparate and fragmented nature of the works at multiple locations spread across the whole of
the paths network means that external contractors would likely be less interested in securing the
work and in any case existing Council staff would still have to co-ordinate overall effort.
Additionally currently there is considerable market volatility and difficulty in securing contractors
for this type of work. Sufficient capacity to directly achieve the desired improvements will best be
achieved by securing a new Core Paths Ranger working as part of the Moray Council Countryside
Team. 
The Core Paths Ranger will initially plan what needs to be done (development and maintenance
schedules) for each path and will carry out the necessary works procuring materials as required.
Costs relating to the officer include salary, employer on costs, vehicle hire and fuel, PPE, phone
and computer. A budget will be required to increase the work capacity of the officer towards a
possible volunteer scheme, signage scheme, equipment and materials and contractor
procurement. 
Page 29

Page 30

The main outputs of the Dorenell Fund spend 2023 – 2026 are explored in more detail below: 
a. Core Paths Ranger
Initially the Ranger will prepare schedules for the necessary works needed to address the issues
related to features on each of the selected priority Core Paths. Path Development Schedules will
focus on improvements which remove barriers to access and maximise accessibility and on
provision of ‘missing’ features. Management Schedules will focus on required maintenance and
vegetation clearance for each path.
Much of the routine work can be carried out on Core Paths without the express permission of
landowners allowed under the Access Legislation. It is important however as a matter of courtesy
and in the interests of partnership working and mutual co-operation that any private landowner is
advised and consulted  by the Ranger before works commence of what will take place and when.
The Ranger will work on their own for many of the path improvement tasks but will work
alongside the existing Countryside Officer for larger Jobs. Using hand and power tools much of
the work such as vegetation clearance, drainage clearance and tree reduction can be carried out
by the officer using hand and power tools without extra cost being incurred. Some jobs will
require materials (e.g. path surfacing, gates, bridge repairs, fencing), and part of the overall
budget has been allocated to this. 
It is accepted that the Ranger would only achieve a limited amount of path improvements
working entirely on their own. It is important therefore to increase the capacity of the Ranger to
achieve more by working collaboratively where possible with others. The emphasis will be on
encouraging social inclusion and community participation.  Where appropriate to increase work
capacity the Ranger will co-ordinate with others such as Criminal Justice Community Payback,
Community and Local Access Groups. There is scope for the Ranger to set up be implemented
with the assistance of the Council’s Community Support Unit. The officer may also have to
occasionally procure contractors for more specialised tasks. 
In summary the main tasks the Core Paths Ranger will be carrying out are as follows:
• Prepare development and management schedules to address issues identified for each
priority Core Path including estimates of costs.
• Engage with landowners and farmers as required to advise on planned works to the paths.
• Carry out day to day physical improvement works identified for each of the prioritised Core
Paths.
• Set up a Core Paths volunteer scheme and co-ordinate and support volunteer efforts.
• Work in partnership with others for larger tasks. Assistance may include help from Local
Access Groups, the Moray Council Countryside Officer, Criminal Justice Community
Payback.
• Assist the Open Space, Access and Policy Officer to implement a Core Paths signage scheme.
• Monitoring – update CONFIRM Lands Management IT system for each path on completion
of works. 
It is intended to initially employ the Core Paths Ranger from October 2023 to December 2025
which is for a period of 27 months. Any extension beyond this period will be subject to available
Page 30

Page 31

finances and opportunities that may arise.  This is based on 6 months 2023/24, 12 months
2024/25 and 9 months 2025/26. The salary would be set at Grade 5 SCP 15.  Employer on Costs
are based at 29% of salary. An estimated annual pay increase has been applied calculated at 3%
per annum. 
Ancillary costs relating to the post will also be incurred as follows 
• Mobile Phone - £200 initially for phone purchase and £55 annual rental 
• Computer/Tablet - £500. Essential for remote working and the officer will not have a
dedicated desktop computer. 
• PPE - £300 for weatherproof clothing and boots. 
• Vehicle Hire (Combo van) - A 10% inflationary increase for each year built in. Fuel use
based on 1000mls per month. 
b. Materials and additional resources for improvements
Much of the work carried out will not require extra materials or equipment particularly activities
like vegetation clearance, tree reduction and clearing drains. Where new path features are
required or where existing ones need replaced or repaired material will require to be procured
including surface aggregate, gates, fencing, timber for bridge repairs/revetments, culverts/drain
pipes.
On a few occasions where more specialist technical input is required it may be necessary to
secure the services of a contractor.
It is important that a financial provision is made for this in each of the 3 years of this Plan which
will initially be a lower sum in the first year 2023/24 due to the required lead in time for works
planning. 
c. Signage Scheme
The Land Reform (Scotland) Act 2003 indicates that all Core paths should be signed although no
deadline has applied. The proposal is to re-introduce the modest Core Path annual signage
scheme that the Council used to operate installing up to 20 new/replacement signs per annum on
the prioritised Core Paths.
£5K in each financial year and £15K in total over life of this plan. 
d. Core Paths Volunteer Scheme
This would increase the work capacity of the Core Paths Ranger by providing ‘boots on the
ground’ to help with tasks where extra help is needed. The scheme would also foster a culture of
community ownership of the Core Paths. The Ranger will work with the Open Space, Access and
Policy Officer to initially set up the scheme through advertising and promotion. At this stage the
assistance and expertise of the Councils Community Support Unit will also be sought. To begin
with the officer would set up and co-ordinate the overall scheme and arrange work days, manage
and supporting the volunteer efforts and arrange for any required materials, equipment and
training. It is hoped however that the scheme will become self-sustaining with key volunteers
adopting this overseeing role and the Ranger reducing input to an assisting and monitoring role.
Page 31

Page 32

A number of community paths groups already have successful volunteer schemes such as the
Dava Way Association and Friends of Ben Rinnes. Any new scheme would not undermine or
duplicate their efforts but would be complementary and add value by concentrating on the Core
Paths that currently have no programmed maintenance arrangements in place. Where
opportunities arise the Ranger can work in partnership with existing access groups to integrate
overall efforts to enhance the Core Paths network. Part of the challenge will be to continually
maintain volunteer interest and provide adequate support that makes them feel continually
valued. Promotion of the scheme will be channelled through Community Councils and MLOAF.
Training and equipment will be provided by the Council to support the volunteers.
Managing such volunteer scheme can be time consuming so this will not be initiated until
2024/25 and only if it is considered the Core Paths Ranger has sufficient capacity. A modest
budget will be required to run the scheme and support the volunteers supplying equipment, tools
and training.
Cost £4k from 2024 – 2026. 
e. Overall Spend Summary 
OUTPUT £
2023/24
£ 2024/25 £
2025/26 
£ TOTAL
Core Paths Ranger salary 13571 27957 21597 63125
Officer on costs 3936 8107 6263 18306
Vehicle hire 1992 4383 3616 9991
Fuel 780 1716 1416 3912
Computer/Tablet     500 0 0 500
Mobile Phone 255 55 55 365
PPE     300 0 0 300
Signage Scheme 5000 5000 5000 15000
Materials/Equipment/contractor
procurement
15715 31885 23899 72501
Volunteer Scheme 0 2000 2000 4000
£ TOTALS 42049 82105 63846 188000 
4. RESULTS OF THE PATH ASSETS AND CONDITION SURVEY 
Up until 2022 there was little information on what the assets were for Moray’s Core Paths
Network. This resulted in any development or maintenance work being piecemeal and
reactionary and not necessarily addressing what improvements were most needed. Before any
planned prioritised work programme could be devised a comprehensive audit needed to be
carried out to establish what was actually out there on all of the Core Paths and what the
condition of the paths and related assets was.
This plan is advised by a comprehensive survey of all the Moray Core Paths that was carried out
by an audit officer over a period of 9 months from July 2022 to March 2023. Information was
captured using the CONFIRM Lands Management IT system. Data was collected on what all the
path ‘features’ (assets) were including path surface types, drainage, bridges, gates, steps and
ramps stiles, gaps, fences, revetments and signage. Each feature has been geographically
Page 32

Page 33

positioned and recorded on a photo. Information was also collected on which of the existing
features were in poor condition or needed replacing to highlight what improvements need to be
carried out. To add value to this approach and to meet the requirement of where possible making
every route more accessible, each path feature was assessed as to whether it presented a
‘barrier’ to access. This facilitates the focus of any development on addressing these barriers. To
further prioritise path development work data was collected on what were the ‘missing’ features
were including signage, drainage, bridges, surfacing etc. that if provided would make the path
more user friendly and accessible. 
The overall approach is shown in the APPENDIX 1 which an extract is showing one path from the
database. This captures what the main issues / defects were with the range of path features to be
found on the path.  Path features defect information like this is held within the database for all of
Moray’s 358 Core Paths. The numbers in the table represent frequency of the occurrence of
particular issues or defects. The CONFIRM database has each path feature geographically located
using GPS co-ordinates including point features such as signage and linear features such as the
different types of path surfaces. In addition to recording specific issues / defects with path
features i.e. barrier to access, missing, needs replacing or is in poor condition; more general
issues are highlighted to focus development priorities. These are recorded when surfaces are
uneven, where there is vegetation encroachment across the path and where surfaces are muddy
when wet. 
All the information collected will be useful in deriving the improvement priorities when
formulating Development and Management Schedules for each path. 
5. SELECTION OF THE PRIORITISED CORE PATHS 
Rationale for scoring
It is accepted that the available Dorenell funds are not sufficient to do everything that needs to
be done on the Core Paths. It is important therefore to channel resources to where they are most
needed and can derive the greatest range of benefits. To ensure this is achieved in a planned
way, selection criteria have been used to determine which paths should be prioritised and where
work should be focussed.  This approach accommodates a more systematic and programmed
method for prioritisation. The criteria have been taken from Strategic Framework Document as
agreed by the 2020 ED and I Committee. For the most part the scoring criteria are equally scored
but 3 criteria are considered to have added importance to merit a weighted scoring. This is
because improvements should focus on paths in the poorest condition which if implemented
would greatly improve accessibility, realising multiple benefits at a reasonable cost. The weighted
criteria are as follows:
Overall path condition -weighting factor x 2
Accessibility/Development Potential -weighting factor x 1.5
Best Value- weighting factor x 1.5 
The criteria consider a wider range of factors relating to each path which collectively facilitates a
comprehensive and balanced approach. Some of the criteria are closely linked whilst others are
discrete and separate.
Page 33

Page 34

APPENDIX 2 of this report lists all the Core Paths ordered in relation to the reference codes to
allow for ease of cross referencing with the Core Paths Plan Maps. The table shows how all the
Core Paths were scored against the criteria on a range from 1 to 5. An aggregate overall score for
each path determines the overall priority that should be attributed to that particular path. 
APPENDIX 3 shows how the total overall scores have been ranked into 3 distinct scoring ranges
and colour coded as follows:  
Top score range (red)–definitely to be taken forward.
Mid-range (yellow)-possibly. 
Low range (green)-unlikely. 
The scorings have been based on an empirical assessment where possible but inevitably elements
of subjectivity have applied based on limitations of current knowledge. It is accepted that for
some of the criteria opinions on scores may differ. To facilitate a more rigorous and robust
approach the scorings have been carried out in conjunction with the Moray Local Outdoor Access
Forum (MLOAF) to achieve a balanced consensus that has taken the range of views from across
the outdoor access community into account. 
The specific criteria used in APPENDIX 2 and APPENDIX 3 and explanation of what each involved
is expanded upon below:  
Demand/Need
Low 1 to 5 high
Consideration of demand is based on the current understanding of the level of public interest in
the path being improved and sustained through better management. The assessment of need
relates to how much the improvements are needed deduced from the current state of the path
and condition of the infrastructure. Both these elements are considered together to achieve an
overall score. 
Community Linkage
Low 1 to 5 high
This related to a greater priority being given to paths which link between separate settlements or
which have good links within areas of the principle towns. This is considered important to
maximise the multiple benefits to be derived from the Core Paths Network. 
Deliverability
Low 1 to 5 high
It is important to assess how easy the path will be to improve and develop based on
consideration of factors like private landowner position, public ownership easier to implement,
topographic constraints, access for vehicles and equipment, remoteness. 5 score relates to the
easiest to improve paths. 
Page 34

Page 35

Best Value
Low 1 to 5 high 
Weighting score x 1.5
This does not just consider likely costs but also considers potential benefits to be derived. A path
which would be expensive to develop and would derive limited benefits would get a low score. 
At this stage there are no detailed costings but there is enough info on the physical nature of the
paths and the related features to get an indication of whether any path would be expensive or
inexpensive to develop. 
Multi-user Potential
Low 1 to 5 high
The main thrust of this action plan is to make the Core Paths network as accessible as possible
within the given constraints to the wide range of persons covered by responsible access rights
under the access legislation i.e. horse riders, wheeled users and pedestrians. A higher score will
therefore be given to paths that with improvement and better management have the greatest
potential to facilitate multi use which will derive the greatest range of benefits. 
Usage/Popularity
Low 1 to 5 high
Some of the Core Paths have user counters installed which have been used to determine usage
and by implication popularity. On many of the paths user figures are not recorded so the
assessment is based on anecdotal evidence of path usage and physical evidence such as path
width and surface wear particularly useful for the routes with natural surfaces. 
Economic/Tourism Benefits
Low 1 to 5 high
Some paths will have greater economic/tourism value particularly strategic routes linking across
Moray, those in scenic areas and those which link features of interest such as
distilleries/viewpoints/historic and cultural sites. 
Health Benefits
Low 1 to 5 high
This is somewhat difficult to assess based on the absence of empirical evidence as all path usage
will have health benefits to some degree. It has been deduced that the greatest potential will be
derived from the easy to access well used paths near to or within centres of population. Also
greater priority is given to paths which are part of a route currently promoted as a ‘health walk’. 
Strategic Importance
Low 1 to 5 high
This relates to an assessment of how important the strategic value of the path is in terms of
active travel and multi-use, settlement linkage, tourism value and integration across the Moray
area. Whilst these aspects are already being assessed individually this considers how they work
together collectively in relation to the path. Included in this is consideration of whether the path
displays and links the best landscapes and features of interest that Moray has to offer. 
Page 35

Page 36

Social Inclusion Potential
Low 1 to 5 high
This will be greatest for paths which physically relate to known areas of social deprivation, low
incomes, poor health etc. where the paths provide a free facility available to all. Indicators such
as SIMD (Strategic Index of Multiple Deprivation) have been taken into account. 
Environmental Impact
Negative 1 to Positive 5
This relates to the perceived sensitivity of the environment through which the paths pass where
any improvements potentially may have negative impacts. The scores take account of formal
environmental designations, landscape value, and ecological value. Whilst any path project would
not necessarily have a ‘positive’ impact, a high score here reflects that the environment has little
or no sensitivity in terms of any path improvements that might be carried out. 
Overall Path Condition
Excellent 1
Good 2 
Satisfactory 3
Poor 4
Very Poor 5
Weighting score x 2
This assessment has been derived from the audit that was carried out for the whole network
which determined what the main issues were in relation the path features outlined in section x
above. This also included recording ‘missing features’. Generally speaking the greater the number
of issues recorded the more priority should be given to that particular path. This score is however
is also an overview of the whole path condition which has ultimately involved a degree of
subjectivity by the path auditor in the assessment. 
Accessibility Development Potential
High existing accessibility/Low development potential – 1
Medium existing accessibility/Low development potential – 1
Low existing accessibility/Low development potential – 2
High existing accessibility/High development potential -3
Medium existing accessibility/High development potential -4
Low existing accessibility/High development potential -5
Weighting Score x 1.5
This is an assessment of the relationship of the existing accessibility of the path relative to its
potential to be improved through development. This is a key consideration in determining which
paths to prioritise given that improving accessibility is the overall objective of this core paths
initiative. Absolute priority is therefore given to paths which currently have low accessibility but
have the greatest potential to resolve this through development. 
Page 36

Page 37

6. RTIF STRATEGIC PATHS PLAN – RELATIONSHIP WITH THIS ACTION PLAN 
The Strategic Tourism Infrastructure Development Plan, Moray Routes: Bright Futures was agreed
at the E D and I Committee on 7th February 2023. 
The Plan funded through the Rural Tourism Infrastructure Fund (RTIF) explores opportunities to
enhance the six long distance walking/ active travel routes in rural Moray. This would be targeted
towards delivery of significant long term benefits to the visitor experience, positively impacting
the visitor economy and the local landscape, whilst also indirectly supporting the Moray Council
Active Travel Strategy. These ‘Moray Routes’ which are all Core Paths comprise the network of
key enabling walking and cycling leisure routes across Moray, which includes:
• Moray Way
• Speyside Way
• Dava Way
• Moray Coastal Trail
• Rothes Way
• Isla Way 
The plan identifies key priorities in a package of measures for Moray Routes infrastructure over
the medium term, defined as being within the next 5 years. The proposals included will support
development of a network of routes that welcomes everyone who wants to walk, cycle and
wheel, that improves interpretation and infrastructure. This is targeted towards providing visitors
with opportunities to move through the landscape at their own pace, increasing the number and
duration of visitor stays, and spending more in local economies. The plan creates a pipeline of
potential projects for Moray to reduce the pressures on communities through improving tourist
infrastructure and enhancing the visitor experience. Securing future rounds of RTIF funding to
implement the projects is wholly dependent on having this Strategic Plan. The specific projects
outlined in the Plan to be taken forward are summarised in the Table below. 
Tier 1 projects are intended to be implemented first as strategic initiatives across all of the Moray
Routes. Tier 2 projects would follow on relating to physical improvements to the paths
infrastructure. These projects if developed in the next few years would resolve many of the issues
already recorded along these Core Paths in the audit. The key factor here is to hold on any
improvements on these Core Paths until a clearer picture emerges of funding and development
timescales for the implementation of the identified RTIF projects. 
Page 37

Page 38

Tier 1 Projects 
Project  Estimated
Capital
Cost 
Description
1. Smart
Destination 
£102,450 -
£111,450 
This strategic project proposes to develop the use of
sensors to generate real time user data to inform
future maintenance and investment decisions,
alongside creation of a visitor app to assist with the
generation of data, while providing mapping, route
information, and improving the quality of visitor stays.
2. Informed
Destination 
£87,000 The second strategic project identifies the need for
installation of 17 interpretation hubs at key points
around the Moray Routes network, to improve
interpretation and provide visitor information.
Total Value Tier
1
£189,450 -
£198,450 
Tier 2 Projects 
Project Indicative
Capital 
Cost
Additional Notes
3. Access for All £73,500 Project in Findhorn on the Moray Coastal Trail. This
would develop an all abilities path and viewing
platform at the beach to alleviate current issues with
access to the landscape for people with restricted
mobility. 
4. Venture up
the Hill
£246,000 Project on Tomintoul Spur of the Speyside Way. The
project will improve the safety and visitor experience
of the route, as it crosses and travels alongside
roads, as well as the construction of a new viewpoint
in the vicinity of the summit of 
5. Link to the
Trails
£450,000 Project on Dufftown Spur of the Speyside Way. The
proposed works will seek to secure existing land slips
and provide a safe route, alongside maintenance of
the Fiddich and Newton bridges, with enhancements
to existing path surfaces.
6. Distilleries
Trail
£72,000 -
£79,500
Project on Rothes Way Spur of the Speyside Way.
The proposals are to provide support in the creation
of the Rothes Way, as a new multi-use route that the
community of Rothes is seeking to establish, linking
Rothes with Craigellachie and the established
Speyside Way.
7. Historic
Connections
£112,500 Project at Dallas Dhu on the Dava Way. This project
proposes to create an all abilities access path onto
the Dava Way from Dallas Dhu to enhance the
experience for visitors and people living in the
communities in the nearby new housing
developments.
8. Coastal
Connections
£187,500 Project at Spey Bay on the Moray Coastal Trail.
Proposals will deliver route enhancements and
Page 38

Page 39

improve the signage of this unique section of the
Moray Routes, which combines the Moray Coastal
Trail and Speyside Way. This will provide a link via
the old railway line to Portgordon and beyond to
Buckie, 
Total Value Tier
2
£1,141,500
-
£1,148,500 
Page 39

Page 40

Moray Core Paths Action Plan 2023-2024 Appendix 1 path Features Issues Defects Extract
BarriertoAccess
Bollard
Condition
Drainage
Fencing
FingerPost
Other
Revetment
Sign-Advisory
Sign–Informatio
Sign-Warning
UnevenSurface
VegetationEncroachment
WayMarker
WetSurface
Number
MuddyWhenWet
GrandTotal
CCP23 3 2 3 2 22 6 8 45 7 98
CCP23 – Califer Hill Path
RAFFORD
Missing 2 3 2 8 15
Missing Feature Type 2 3 2 8 15
Needs Replacing 9 9
Ditch -(Open) 4 4
Earth - (Muddy When Wet) 2 2
Fence 2 2
Other 1 1
Poor 36 36
Ditch -(Side Let) 1 1
Earth 7 7
Earth - (Muddy When Wet) 3 3
Fence 5 5
Fingerpost 2 2
Gate 1 1
General Waste 1 1
Grass -Muddy When Wet) 1 1
Mapboard 1 1
Other 9 9
Sealed Surface - (Narrow) 1 1
Steep Slope 1 1
Warning 3 3
Yes 3 22 6 7 38
Aggregate -(Narrow) 1 1 2
Earth 8 1 9
Earth - (Muddy When Wet) 2 4 5 11
Fence 1 1
Grass 2 2
Grass -Muddy When Wet) 1 1 2
Public Road - (Narrow) 1 1
Sealed Surface - (Narrow) 1 1
Sealed Surface (Wide) 2 2
Vehicle Track -(Aggregate) 5 2 7
Page 40

Page 41

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP01 1 1 2 2 3 4 4 3 1 2 2 1 1 30
CCP01 – Brodie Castle Trail              
BRODIE              
This route has good quality paths but requires waymarkers to navigate the route.
There are a few muddy sections requiring attention and the road crossing near
the pond could do with tactile paving. A small footbridge may be slippery in the
wet and would be better replaced with a culvert. 
1 1  2  2  3  4  4  3  1  2  2  1  1  30               
Page 41

Page 42

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP02 3 2 3 3 4 2 2 2 2 2 5 4 5 48.5
CCP02 -  Burnie Path              
DYKE               
Half of this route is overgrown, muddy and a barrier to access. The section of
path running close to the stream/ditch is very low and will be flooded from time
to time. People are walking in the field as it is in better condition as it is higher
up. This might be an option to relocate the path 2m higher up at the edge of the
field. The edge of the path next to the ditch/stream is also eroding, there is old
revetment at the side of the stream but it too is falling apart. The path from the
cemetery to the road at the East end looks to have encroaching grass in summer
and will need a strim. The woodland section has some dead trees and a culvert
requiring fencing. More fencing is required alongside the river where existing
fencing needs replacing.  The aggrefate paths around Dyke itself are good. 
3 2  3  3  4  2  2  2  2  2  5  4  5  48.5               
Page 42

Page 43

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP03 3 3 3 3 4 3 3 3 2 2 5 4 5 52.5
CCP03 – Fairyhills Wood Path              
ALTYRE              
This route is overgrown with gorse and broom and most of the route is also
muddy. There are quite a few barriers to access due to the encroaching
vegetation and wet areas. Safety signage at the quarry has encroaching
vegetation and needs cleared. There are no waymarkers. A fingerpost and
several waymarkers required to navigate the various paths in the woodlands.
Despite the issues, the path appears well used. 
3 3  3  3  4  3  3  3  2  2  5  4  5  52.5               
Page 43

Page 44

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP04 3 3 3 3 4 3 4 3 2 2 4 4 4 50
CCP04 – Loch of Blairs Circular Path              
ALTYRE              
This route runs on a mixture of earth and aggregate paths. Horses use this route
on a regular basis. There are a lot of muddy sections and some patches of
encroaching vegetation. There are no waymarkers on the route, several
waymarkers are required to navigate the paths. With a car park, this route has
the potential to become all ability, however the muddy sections will need
addressed. 
3 3  3  3  4  3  4  3  2  2  4  4  4  50               
Page 44

Page 45

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP05 2 3 2 3 3 2 2 4 2 3 2 2 1 34.5
CCP05 – Lochyhill  Path              
FORRES              
This straight route runs on tarmac. There is encroaching vegetation at the edges,
however this could affect the quality of the path in Summer and may require a
cut/strim. Two fingerposts required each side and a motor vehicles warning sign
needs replaced. 
2 3  2  3  3  2  2  4  2  3  2  2  1  34.5               
Page 45

Page 46

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP06 2 2 2 3 3 3 2 2 3 2 2 1 1 31
CCP06 – Enterprise Park Circular Path              
FORRES               
A good network of aggregate and tarmac paths. Some additional waymarkers
required. One seat is wobbly and needs replaced. Some dropped kerbs are
missing tactile paving. At the road crossings there are missing Give Way advisory
signs for cyclists, however it is a bit confusing where the cycle paths start/end.
There is one section of aggregare path where encroaching moss needs scraped
back. There are several short muddy areas on the aggregate paths. There are a
few trees in need to attention however the woodlands appear to have regular
maintenance. The waymarker mapboards need a clean before some become
unreadable. 
2 2  2  3  3  3  2  2  3  2  2  1  1  31               
Page 46

Page 47

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP07 2 3 3 3 3 2 2 3 3 3 3 3 4 43.5
CCP07 – New Forres Link              
FORRES               
Half this route runs on a public road with no issues. The other half is muddy and
overgrown and a barrier to access. The section alongside the fields has
encroaching gorse and is muddy, this narrow path is a barrier to access. The
track through the woodlands is muddy and there are dead branches above the
path that needs further assessment. Waymarkers required for this route, some
can be incorporated into missing feature fingerposts with neighbouring paths. 
2 3  3  3  3  2  2  3  3  3  3  3  4  43.5               
Page 47

Page 48

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP08 3 4 3 3 3 1 3 4 4 2 2 2 3 41.5
CCP08 – Pilmuir West Flood Path              
FORRES              
This route requires waymarkers and a fingerpost to navigate the route. There is
encroaching vegetation to cut back and strim in the summer on the Southern
section. The section to Pilmuir Road area has encroaching vegetation, is muddy
and short section is a barrier to access. The section that runs up to the A96 is
good, with a couple of muddy sections and aggregate that is grassing over but
still a good surface. 
3 4  3  3  3  1  3  4  4  2  2  2  3  41.5               
Page 48

Page 49

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP09 2 3 3 3 3 1 3 3 3 2 2 2 1 34.5
CCP09 – Pilmuir Link Path              
FORRES               
This route runs on aggregate paths. The East end section is muddy at the gate,
without clearing the aggregate here will be overgrown with grass. The gate here
is broken and always open, not sure if a gate is still needed here? The aggregate
section up to Pilmuir Road West is good, it is grassing over but is good to walk
on. The gate area at Pilmuir Road West is getting muddy and there is a raised
kerb at the pedestrian gate here. Cars often park around this area that can limit
access to the gate. The vehicle gate here is also unlocked and may require an
authorised vehicles only sign. There are no waymarkers, 1 fingerpost and 2
waymarkers required that can also incorporate waymarkers for neighbouring
paths. 
2 3  3  3  3  1  3  3  3  2  2  2  1  34.5               
Page 49

Page 50

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP10 2 3 3 3 3 1 2 3 3 2 2 1 1 32
CCP10 – Pilmuir Road West              
FORRES              
This route runs on public road pavements.  There are no waymarkers,
waymarkers required can be fitted to lamp posts. The main issue on this route is
encroaching vegetation. There is a hedge, branches and gorse to be cut back and
grass at a wire fence that may need spraying. There are two raised kerbs as
barriers and two dropped kerbs missing tactile paving. 
2 3  3  3  3  1  2  3  3  2  2  1  1  32               
Page 50

Page 51

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP11 1 4 2 3 3 1 3 4 3 3 2 3 1 37
CCP11 – Pilmuir Cycle Path              
FORRES              
This route runs on tarmac paths. Waymarkers are required on this route as well
at tactile paving at road crossings and Give Way signage. A blue pedestrian and
cyclist sign at Bainaferry Road is facing the wrong direction and there are 2
narrow bollards on the path at this area. There is encroaching vegetation in the
Northern woodland area and this area also has no street lighting. 
1 4  2  3  3  1  3  4  3  3  2  3  1  37               
Page 51

Page 52

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP12 0 3 1 2 4 1 3 4 2 2 1 0 1 25.5
CCP12 - Knockomie Link              
FORRES              
This route runs on wide tarmac paths with street lighting. There are two dips on
the tarmac path that puddles form in.
This route requires waymarkers, these can be located on lamp posts or a
proposed fingerpost with CCP13. If route is to be a cycle route, Give Way
signage and blue pedestrian and cyclist signage required. There is a dropped
kerb missing tactile paving at the West side of this path. 
0 3  1  2  4  1  3  4  2  2  1  0  1  25.5               
Page 52

Page 53

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP13 1 4 1 3 3 1 3 4 2 3 1 0 1 28.5
CCP13 – Grantown Road Cycle Path              
FORRES              
This route runs on good tarmac paths with street lighting.  Waymarkers required
on route. There are several road crossings missing Give Way signage and tactile
paving. A couple of areas are confusing on the route. The section from the
junction at Gran  1  4  1  3  3  1  3  4  2  3  1  0  1  28.5               
Page 53

Page 54

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP14 1 2 1 3 1 2 3 1 3 1 2 1 2 26.5
CCP14 – Kinloss Wetlands Path              
KINLOSS               
Half this route is mostly wet and muddy with encroaching vegetation. The other
half is very wet, overgrown and a barrier to access. The route requires
waymarkers and the bird hide area needs a new picnic table. The small bridge is
in poor condition and could be replaced with a culvert. A raised aggregate
walkway or similar required to raise the path above the water table although
NatureScot likely to resist this due to environmental sensitivity of the location. 
1 2  1  3  1  2  3  1  3  1  2  1  2  26.5               
Page 54

Page 55

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP15 2 2 2 2 3 3 3 3 2 2 2 2 4 37
CCP15 – Mosset Flood Track              
FORRES               
This route has no waymarkers.  Fingerposts and waymarkers required.  If
livestock will ever be in the grounds, livestock warnings required and close the
gate signs. There are a few muddy sections on the vehicle track and encroaching
vegetation towards the Southern section.  The two gates at the cattle grids do
not self-close and the pin strainers need replaced. This route has the potential to
be all ability access, however narrow aggregate at the gates needs attention. A
dedicated parking area for disabled access would also be required. One of the
gates at the parking area is unlocked, the parking area blocks access to this
unlocked vehicle gate 
2 2  2  2  3  3  3  3  2  2  2  2  4  37               
Page 55

Page 56

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP16 1 4 1 2 4 1 3 4 2 3 1 1 1 30
CCP16 – Ferrylea Cycle Link              
FORRES              
This route runs on new wide tarmac cycle lane pavements. There are tactile
paving missing at the west end A940 road crossing. There are no waymarkers on
the route, waymarkers are required and can be located on lamp posts. There are
8 road crossings on this route and all 8 are missing Give Way signage for cyclists,
this can be incorporated into bollards as has been the case on other new cycle
paths in Elgin. 
1 4  1  2  4  1  3  4  2  3  1  1  1  30               
Page 56

Page 57

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP17 2 3 2 3 3 3 3 3 3 3 1 2 1 34.5
CCP17 – Greshop to Station Link              
FORRES              
This short path runs on wide public road pavement. Waymarkers are required at
each end on lamp posts. Most of the route appears to have encroaching
vegetation in the summer and this may need to be cut back further by roads
maintenance. There are some branches encroaching quite badly on a short
section that need pruned as well. If this is to be a cycle path then appropriate
signage will be required. 
2 3  2  3  3  3  3  3  3  3  1  2  1  34.5               
Page 57

Page 58

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP18 1 3 2 3 3 4 3 3 2 4 1 1 1 33
CCP18 – Waterford Cycle Link              
FORRES              
This route runs on public wide pavements and has street lighting. Signage
indicating the end of the cycle path at the A96 end required and signage
indicating the route is a cycle path required at the North end at Waterford Road.
There is a broken fingerpost near the A96 junction, this may be redundant with
the metal fingerpost nearby. 
1 3  2  3  3  4  3  3  2  4  1  1  1  33               
Page 58

Page 59

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP21 2 2 3 2 3 3 3 3 1 3 3 2 1 35.5
CCP21 – Woodside Track - Rafford              
RAFFORD              
Short route from Rafford to Dava Way. Addressing drainage and encroaching
vegetation would improve access.  2  2  3  2  3  3  3  3  1  3  3  2  1  35.5               
Page 59

Page 60

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP22 2 3 3 2 3 2 2 3 2 2 3 3 4 40.5
CCP22 – Granary Loop Track - Rafford              
RAFFORD              
A fairly level path that is well used. Surfacing and drainage issues, could offer a
good level of accessibility if improved.  2  3  3  2  3  2  2  3  2  2  3  3  4  40.5               
Page 60

Page 61

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP23 3 2 3 2 3 4 2 2 2 3 5 4 5 49.5
CCP23 – Califer Hill Path - Rafford              
RAFFORD              
This route will always have access limited by its hilly terrain. However the lower
section is in needs drainage and cutting back of vegetation.  As this path
connects Rafford to Califer Viewpoint it is likely to be used often I improved. 
3 2  3  2  3  4  2  2  2  3  5  4  5  49.5               
Page 61

Page 62

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP25 2 3 3 3 3 2 4 2 3 1 2 2 1 34.5
CCP25 - Blervie Wood Path - Rafford              
RAFFORD              
A short woodland path that requires some vegetation cut back, waymarking and
some muddy sections addressed. 3 dead trees need further inspection. At the
side of the path, a few metres away, there is a barbed wire fence with barbed
wires going down to ground level. Although vertical markers bars are present at
intervals, still a risk dog/person could run into fence. 
2 3  3  3  3  2  4  2  3  1  2  2  1  34.5               
Page 62

Page 63

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP26 1 1 2 2 3 2 3 3 2 2 3 2 1 31.5
CCP26 – Tarryblake Path              
ROTHIEMAY              
This path needs some maintenance to address drainage issues and pruning of
vegetation. Waymarkers and better access at the car park would help. Still
limited by the hilly terrain.  1  1  2  2  3  2  3  3  2  2  3  2  1  31.5               
Page 63

Page 64

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP27 3 3 2 3 3 2 3 3 4 2 4 4 5 49.5
CCP27 – St Aethans Path              
BURGHEAD              
This route is badly overgrown with gorse and has a lot of muddy sections. There
are no waymarkers for this route, 1 fingerpost, 1 waymarker post required, 1
waymarker on a lamppost required. On the path near Fraser Road, a narrow gap
between barrier stones is a barrier to access. Drainage required on the path and
resurfacing on the path will help with the muddy sections. Farmer likely to want
to limit vehicle access; track would need surfacing to address the muddy
section. 
3 3  2  3  3  2  3  3  4  2  4  4  5  49.5               
Page 64

Page 65

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP28 0 3 2 2 4 1 2 3 2 2 1 0 1 24.5
CCP28 – Carsehill Path              
ALVES              
Path link to A96 bus stop. Good tarmac surface. 0 3 2 2 4 1 2 3 2 2 1 0 1 24.5               
Page 65

Page 66

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP29 2 3 3 3 3 2 3 2 3 2 4 3 4 44.5
CCP29 – Miltonduff Wood Paths              
MILTONDUFF               
These paths are very overgrown and muddy in places and is easy to get lost in
due to the numerous paths. There are also no waymarkers and the paths are
used by horses meaning the surfaces are getting churned up. Despite this, the
paths seem to have plenty people using them. There are two steep slopes that
may requires a handrail/steps and a couple of gates that could be removed. 
2 3  3  3  3  2  3  2  3  2  4  3  4  44.5               
Page 66

Page 67

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP30 3 3 3 3 3 3 3 2 3 2 4 4 4 48
CCP30 – Dallas Wood Paths              
DALLAS              
Routes need vegetation cleared and waymarkers. Replacing the old short bridge
with a culvert would improve access. An inspection of the trees would also be
required to identify any maintenance. 
3 3  3  3  3  3  3  2  3  2  4  4  4  48               
Page 67

Page 68

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP31 1 3 2 3 3 1 3 1 2 1 3 2 1 30.5
CCP31 – Hopeman School Brae Path              
HOPEMAN              
The steep terrain will always limit access.  However encroaching vegetation on
the steps and path to car park need maintenance. Waymarkers and fingerpost
required on route.  1  3  2  3  3  1  3  1  2  1  3  2  1  30.5               
Page 68

Page 69

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP32 0 3 0 3 3 1 3 4 3 2 1 0 1 25.5
CCP32 – Sunbank Cycle Path              
LOSSIEMOUTH              
This path has half of the route not constructed. Part of the path is under
construction in a housing development and next to this the route passes through
fields and gorse where no path has existed before.  The path that is already on
the route is not suitable for cyclists and is poor for pedestrians. It is badly
overgrown, difficult to follow and has steps and a raised kerb. This will all
however be resolved when the housing development is completed and the new
multi - user path has been built. 
0 3  0  3  3  1  3  4  3  2  1  0  1  25.5               
Page 69

Page 70

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP33 2 3 2 3 3 4 3 3 2 2 4 1 4 42.5
CCP33 – Ladyhill Path              
ELGIN              
This route has an overgrown aggregate path that needs widened. Barrier fences
at steep banks would improve safety. Waymarkers required and a parking area
with a dedicated disabled parking space would improve access. Lighting would
allow better access at night/winter. 
2 3  2  3  3  4  3  3  2  2  4  1  4  42.5               
Page 70

Page 71

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP34 1 4 0 3 4 1 3 4 2 3 1 0 1 28.5
CCP34 – Hamilton Gardens Cycle Path              
ELGIN              
This new route runs on new tarmac pavements. Give Way signage incorporated
into a bollard required at road crossings, this would make crossings consistent
across Elgin. Fingerposts required at each end and additional waymarkers
required. All of the current waymarkers are one sided only. Some tactile paving
missing and encroaching vegetation at the Covesea Road end. 
1 4  0  3  4  1  3  4  2  3  1  0  1  28.5               
Page 71

Page 72

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP35 1 3 1 2 3 1 2 4 2 3 1 0 1 25.5
CCP35 – Spynie Cycle Link              
ELGIN              
This route runs on new tarmac pavements and surfaces. The route is lacking
tactile paving at road crossings and Give Way signage. There are two raised
kerbs as barriers and the metal barriers across the path are narrow for
wheelchairs. The lane near Spynie Care home has encroaching vegetation. The
route requires waymarkers. 
1 3  1  2  3  1  2  4  2  3  1  0  1  25.5               
Page 72

Page 73

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP36 1 4 1 3 3 3 4 5 3 4 1 1 1 36
CCP36 – Elgin/Lhanbryde Cycle Path              
ELGIN/LHANBRYDE               
This route is highly accessible due to being on tarmac pavements and surfaces,
however encroaching vegetation and missing signage need addressed.
Waymarkers and fingerpost required around the Lhanbryde end as well as
missing advisory signage. The road crossing at the B9103 can be difficult to cross
when the road is busy, a missing Give Way bollard here needs replaced. The
pavement just outside Lhanbryde is narrow with encroaching grass and further
on moss is making the edges slippery. Encroaching branches will need pruned
back a sections along whole length of route. Ground lighting does not look in
working condition and several units are missing.  Street lighting the route
through Elgin would improve access. The short section near North College Street
has uneven tarmac due to tree roots, this will need addresses before it gets
worse. 
1 4  1  3  3  3  4  5  3  4  1  1  1  36               
Page 73

Page 74

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP37 2 3 2 3 3 1 3 2 3 1 4 2 5 41.5
CCP37 – Lesmurdie Link Path              
ELGIN               
This route has a steep bank that will always limit access. The set of steps at
Lesmurdie Road need maintenance and have encroaching vegetation.  The path
to the River Lossie is overgrown and muddy and a barrier to access in the worst
section. There is a short, steep, uneven section of path at the River Lossie where
the route meets CP-EG25, here the path requires resurfacing with possibly a
ramp and handrail. There are no waymarkers, two fingerposts required and
maybe an additional waymarker. There are a number of dead trees around the
path requiring further assessment. 
2 3  2  3  3  1  3  2  3  1  4  2  5  41.5               
Page 74

Page 75

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP38 2 4 2 3 4 1 2 3 3 2 3 2 1 36.5
CCP38 – Mayne Road Link              
ELGIN               
This route runs on tarmac surfaces, it has good access however the section of
the path that links Braco Place to Pluscarden Place has a steep hill that will limit
access. There is encroaching vegetation, a broken fence, steep concrete section
and two possibly redundant gates at this Braco Place area. A handrail could be
installed on the steep section here, steps could be installed but this may limit
buggies.  Street lighting on the section between Braco Place and Pluscarden
Place would improve access. There are a number of raised kerbs as barriers and
dropped kerbs without tactile paving. Waymarkers are required to navigate this
route, all of which can be located on lamp posts. 
2 4  2  3  4  1  2  3  3  2  3  2  1  36.5               
Page 75

Page 76

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP39 2 3 3 3 4 1 2 3 3 2 4 2 4 43
CCP39 – Institution Path              
ELGIN               
This historic route is well hidden. It requires waymarkers/fingerposts at either
end. The path has street lighting but has some badly overgrown areas from
neighbouring properties affecting the lights and the path. The route has uneven
cobbles at one end that may limit access. The path has aggregate for most of the
route with muddy sections. There are several walls either side of the path that
are showing deterioration and require further assessment. Pruning back
vegetation and resurfacing would improve access. 
2 3  3  3  4  1  2  3  3  2  4  2  4  43               
Page 76

Page 77

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP40 0 4 1 3 4 1 3 4 3 1 1 0 1 27.5
CCP40 – Dovecot Cycle Path              
ELGIN              
A short tarmac path, waymarkers required and street lighting on one section
would improve access. 
0 4  1  3  4  1  3  4  3  1  1  0  1  27.5               
Page 77

Page 78

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP41 2 4 2 3 3 1 3 4 3 1 2 2 1 34.5
CCP41 – New Elgin Link              
ELGIN              
Waymarkers required to help navigate streets.  Street lighting would improve
Dovecot park section. Not sure if entire route is allocated for cycling, especially
at protected road crossing area.
Path Condition Score : 1  2  4  2  3  3  1  3  4  3  1  2  2  1  34.5               
Page 78

Page 79

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP42 1 4 0 3 4 1 3 4 2 1 1 0 1 26.5
CCP42 – Birnie Road Cycle Path              
ELGIN              
This path is new and has easy access. Waymarkers required at both ends.
Lampposts along whole route  1  4  0  3  4  1  3  4  2  1  1  0  1  26.5               
Page 79

Page 80

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP43 1 4 1 3 4 1 3 4 2 1 1 1 1 29
CCP43 – Southfield Cycle Path              
ELGIN              
This route runs on public roads and wide pavements. Waymarkers are required.
There are a number of road crossings that would require cyclists on this route to
give way, signage for this required. 
1 4  1  3  4  1  3  4  2  1  1  1  1  29               
Page 80

Page 81

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP44 1 4 0 3 4 1 3 4 2 2 1 0 1 27.5
CCP44 – Linkwood Cycle Path              
ELGIN              
This path runs on wide tarmac surfaces and pavements. Waymarkers required.
The whole route has street lighting.  1  4  0  3  4  1  3  4  2  2  1  0  1  27.5               
Page 81

Page 82

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP45 1 4 1 4 4 1 3 3 3 3 1 0 1 30.5
CCP45 – Linkwood Road Cycle Path              
ELGIN              
This route requires waymarkers and Give Way signage/tactile paving at 2 road
crossings.  1  4  1  4  4  1  3  3  3  3  1  0  1  30.5               
Page 82

Page 83

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP46 4 1 5 3 3 4 4 2 2 2 4 5 1 47
CCP46 – Millbuies Paths              
FOGWATT               
The hilly terrain at Millbuies will always limit access. There are however some
uneven sections that are barriers on the north side if the water that are badly
worn with exposed roots. This north side path also has some steep banks
requiring fencing. The short bridges/boardwalks need repairs and could be
replaced by culverts. 2 of the bridges are getting old and would benefit from a
replacement. Several dead trees need removed and some encroaching
vegetation. There are a few muddy sections that need attention. Waymarkers
required to follow the core path and safety signage and lifesaving rings required.
The path from the car park to the pond has the potential to be all ability with
some work. 
4 1  5  3  3  4  4  2  2  2  4  5  1  47               
Page 83

Page 84

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP47 3 4 3 3 3 2 3 3 3 2 4 3 5 49
CCP47 – Kingston Road Path              
GARMOUTH               
Path is very narrow and close to the road for most of the route.  There are a lot
of culverts on this path hinting that this route often floods and needs good
drainage. Bumpy edges of road will create puddles that will soak pedestrians on
path. At either end of the path there are only narrow roads to walk on with blind
corners, however these do allow all ability access at either side of this path. 17
culverts run under path at quite a shallow level - these are part of the public
road, however if they block, puddles on the road will be a problem for walkers
getting splashed by vehicles. 
3 4  3  3  3  2  3  3  3  2  4  3  5  49               
Page 84

Page 85

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP48 1 3 1 3 3 3 2 4 2 4 1 1 1 31
CCP48 – Loch Oire A96 Cycle Path              
MOSSTODLOCH              
This popular route runs on public roads and pavements and tarmac. Some
maintenance is required. Additional waymarkers required and Give Way signage
and blue cycle/pedestrian signs at road crossings. There are some sections with
encroaching vegetation that needs maintained and muddy areas. There are a
number of dead trees requiring further assessment and two near Loch Oire that
have been reported to roads department. The public road pavement from the
petrol station to just before Baxters is too narrow for cyclists and pedestrians to
pass. 
1 3  1  3  3  3  2  4  2  4  1  1  1  31               
Page 85

Page 86

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP49 2 3 2 3 3 3 3 3 2 2 3 2 1 36.5
CCP49 – Leitch’s Wood Link Path              
FOCHABERS              
Path is limited by terrain.  The area with most of the access issues is into the
steep woodland area near the A96, drainage issues need addressed on this
section. Some resurfacing woodland path in Fochabers and waymarking would
help navigate the route better. Considerable gorse encroachment in top
section of path.  2  3  2  3  3  3  3  3  2  2  3  2  1  36.5               
Page 86

Page 87

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP51 3 3 3 3 3 2 3 3 3 2 4 3 5 48
CCP51 – Slackend Path              
PORTGORDON              
A short path with overgrown grass and soft sand limiting access.  With tarmac
surfaces at either end, access for buggies and wheelchairs would be possible if
route was re-surfaced. However blown sand from nearby field will need
addressed.  3  3  3  3  3  2  3  3  3  2  4  3  5  48               
Page 87

Page 88

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP52 3 2 3 2 2 2 2 3 2 2 3 3 5 41
CCP52 – Clochan Right of Way              
CLOCHAN              
A short grassy path that has drainage issues at one end creating a barrier to
access. In dry weather the path is ok, however regular maintenance is required
to stop grass blocking path. Adding drainage and a smooth aggregate/tarmac
path would increase the accessibility and reduce maintenance. 
3 2  3  2  2  2  2  3  2  2  3  3  5  41               
Page 88

Page 89

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP53 3 2 3 3 3 2 3 3 3 2 4 3 4 45.5
CCP53 – Reservoir Path              
PORTKNOCKIE              
Half of track is unsurfaced and overgrown and this limits access. With tarmac
street at one end, this path could allow better access. New t-shaped aggregate
section could allow parking area if vehicles allowed on track. 
3 2  3  3  3  2  3  3  3  2  4  3  4  45.5               
Page 89

Page 90

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP54 2 3 1 3 3 2 3 4 3 2 2 1 1 33
CCP54 – Balnacoul Link Path              
MOSSTODLOCH              
With all ability access on 90% of the route, the overgrown grassy section that
joins the B9015 is a barrier.  A popular route that needs maintenance. 
2 3  1  3  3  2  3  4  3  2  2  1  1  33               
Page 90

Page 91

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP55 1 3 1 3 3 2 3 3 2 1 3 1 1 31
CCP55 – Seafield Farm Track              
CULLEN              
Route will always limit access due to steep slope. However work is needed to
address muddy tracks, old fences and adding waymarkers. Barriers in the town
area around the metal fences and bin to be addressed. 
1 3  1  3  3  2  3  3  2  1  3  1  1  31               
Page 91

Page 92

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP56 2 3 2 3 3 2 3 2 3 1 4 2 5 42.5
CCP56 – Littlehill Circular Path              
NEWMILL              
Improving/adding drainage and surfaces on the unsurfaced vehicle track and on
Hill Street would make half the route more accessible. However route is limited
by hills on it's terrain.  2  3  2  3  3  2  3  2  3  1  4  2  5  42.5               
Page 92

Page 93

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP58 3 1 4 2 3 3 2 3 2 1 4 3 5 44
CCP58 – Moss of Rothiemay Path              
ROTHIEMAY              
Access issues on this site are mainly down to lack of maintenance. Clearing
vegetation and repairing the boardwalks would allow better access. A dedicated
parking area would also allow easier access.  The site itself has a lot of small
trees growing that may affect the peatland area. 
3 1  4  2  3  3  2  3  2  1  4  3  5  44               
Page 93

Page 94

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP59 2 2 3 2 3 3 3 2 2 2 3 2 2 36
CCP59 – Meikle Balloch Hill Paths              
KEITH              
Path access is limited by the hilly terrain.  First section is closed due to trees
down from storm damage. Some water damage to the path and ditches further
up the path. Maintenance required to manage wet areas and cut back
vegetation along whole path. A lot of infrastructure has been installed on this
path already such as culverts, aggregate and ditches. 
2 2  3  2  3  3  3  2  2  2  3  2  2  36               
Page 94

Page 95

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP60 3 2 3 2 3 3 2 3 2 3 4 3 4 44.5
CCP60 – Maisley Road              
KEITH               
Route is limited by terrain, some steep hills. However it is a useful, safe
alternative to using the B9014 main road and could form part of a future off road
Isla Way. Needs basic maintenance of clearing vegetation and adding
waymarkers. 2 problem areas, blocking access- hazardous tree needs removed
down from the farm on Maisley Road and confusion at the farm area where the
path looks to go through private land.  This area has two new vehicle gates on
the path route. Golf course close by at start of this route. 
3 2  3  2  3  3  2  3  2  3  4  3  4  44.5               
Page 95

Page 96

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP61 3 4 2 3 3 3 2 2 3 3 5 3 5 50
CCP61 – Seafield Terrace Link Path              
KEITH              
Access will always be limited by the steep terrain. However, fencing off the drop
at the side of the path and cutting back vegetation would help. The hill down to
the kissing gate is limiting access due to the lack of constructed path and
overgrown vegetation. 
3 4  2  3  3  3  2  2  3  3  5  3  5  50               
Page 96

Page 97

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP62 2 2 3 2 3 3 2 2 2 2 2 2 1 31.5
CCP62 – Maltkiln Burn Path              
DUFFTOWN              
A short path with great views, a medium gradient hill climb that levels out.
Mainly lacking signage for navigation and safety around vehicles, due to being
next and on distillery land. Road crossing area at A941 is the most dangerous
area, where a busy road meets a junction at the Distillery warehouses. 
2 2  3  2  3  3  2  2  2  2  2  2  1  31.5               
Page 97

Page 98

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP63 2 3 2 3 3 4 4 4 3 3 2 2 1 39.5
CCP63 – Rothes Old Railway Path              
ROTHES              
A new path with access from Rothes. The path will need regular maintenance to
manage the surface, especially the sections shared with vehicles.  The whole
path requires pruning back of vegetation and management and
monitoring/inspection of trees either side of the path, lots of very large splayed
willows and dead trees line the whole path. The passing places besides most
gates are too narrow for wheelchairs/trikes to pass easily. If the section to
Craigellachie goes ahead, careful planning of the route around the cottage at the
junction to the A941 will be required to avoid people walking/cycling over this
junction area. 
2 3  2  3  3  4  4  4  3  3  2  2  1  39.5               
Page 98

Page 99

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP64 3 4 3 2 3 1 2 3 3 1 3 3 4 41.5
CCP64 – Dallachy Link Path              
DALLACHY              
The section of path that runs on pavements is good. However the sections that
run on aggregate need widened and drainage.   Waymarking also required. 
3 4  3  2  3  1  2  3  3  1  3  3  4  41.5               
Page 99

Page 100

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP65 2 3 3 2 3 2 2 2 2 2 4 3 1 37
CCP65 – Knockando School Path              
KNOCKANDO               
Steep hill section will always limit access. A short path but important for
community to avoid busy road, church, school nearby. Resurfacing vehicle track
with drainage and improving safety on tarmac track would improve access.
Old bridge requires inspection to assess safety, will require work. A fingerpost
will be required at the start of the path at the junction of the school and church-
fingerpost finger can be added to the waymarker (missing feature) on CPN-SP20 
2 3  3  2  3  2  2  2  2  2  4  3  1  37               
Page 100

Page 101

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP66 3 3 2 3 3 1 2 2 2 1 3 3 1 34
CCP66 – Woolfies Brae              
ABERLOUR              
Access will always be limited by steep tarmac sections. On the lower areas,
steps, bollards and kerbs create barriers. Higher sections have encroaching
vegetation and regular maintenance is required on this route. 
3 3  2  3  3  1  2  2  2  1  3  3  1  34               
Page 101

Page 102

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP67 3 2 3 2 3 2 3 2 2 1 4 3 5 43
CCP67 – Wood of Aberlour Path              
ABERLOUR              
A pleasant woodland path that needs some maintenance and upgrading.
Access is limited by steep terrain, however improving drainage and waymarkers
are easy fixes to a popular path. Replacing the kissing gate at Allachy Drive
would allow better access. 
3 2  3  2  3  2  3  2  2  1  4  3  5  43               
Page 102

Page 103

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP69 1 1 1 1 3 2 2 3 1 1 1 2 1 22.5
CCP69 – Little Balloch Path              
CABRACH              
All vehicle tracks and access will always be limited by the hilly terrain, vehicle
tracks however are good. Adding fingerposts and clarifying whether parking at
end of track at entrance to Wind Farm track is possible would improve access. 
1 1  1  1  3  2  2  3  1  1  1  2  1  22.5               
Page 103

Page 104

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP70 2 1 2 1 3 2 2 2 1 1 5 2 5 37.5
CCP70 – Balloch Moss Path              
CABRACH              
Access will always be limited by hilly terrain.
Route runs through the middle of a field where cattle and sheep graze, this is a
barrier to access, especially if cattle are present. A double fenced route would
stop the risk of mixing with livestock. Half of path runs on a very muddy track
with poor drainage. The section through the grassy/earthy field has no defined
path in places and will require livestock proof waymarkers. 
2 1  2  1  3  2  2  2  1  1  5  2  5  37.5               
Page 104

Page 105

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP71 1 1 1 1 3 3 2 1 1 1 3 2 2 27
CCP71 – Blackwater Track              
CABRACH              
Route will always be limited by the remote and hilly terrain, however good to
cycle on mountain bike. Drainage needs improved/maintained on the vehicle
tracks. Track runs close to a couple of steep banks that may require barriers.
Waymarkers required. 
1 1  1  1  3  3  2  1  1  1  3  2  2  27               
Page 105

Page 106

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP72 1 1 1 1 3 3 2 1 1 3 4 2 5 35.5
CCP72 – The Roch Ford              
CABRACH              
Route access will always be limited by the hilly and remote terrain. However
barriers such as gates that don't work, fords and overgrown sections could be
easily improved. A very scenic route that can be partially be cycled by mountain
bikes, could be fully available to horse riders and cyclists with improvements. 
1 1  1  1  3  3  2  1  1  3  4  2  5  35.5               
Page 106

Page 107

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CCP73 2 1 1 2 2 4 4 1 2 3 3 2 2 34
CCP73 – Ben Rinnes Hill Path              
GLENRINNES              
Access is limited by the geography of the route. It is normal as a mountain path
to have steep uneven sections. Access at the bottom is limited by limited
available parking. The path requires a lot of regular maintenance especially
nearer the top where a large amount of cross drains and steps have been
installed. Raised cross drains do pose a trip hazard, however the uneven terrain
is expected on a mountain path. The short length of this path does however
bring many hill walkers on the route. 
2 1  1  2  2  4  4  1  2  3  3  2  2  34               
Page 107

Page 108

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-BK01 3 3 3 3 3 3 3 2 3 2 4 2 4 45
Gollachy Burn Path - Buckie              
Buckie               
Half of this route runs on tarmac surfaces and is in good condition.  The other
half has some very muddy earth and unsurfaced vehicle tracks. There is also
encroaching vegetation on this northern section towards the A990. More
waymarkers required and some existing ones are in poor condition.  A steep
bank requires a barrier down the slope towards the bridge near the A990. Some
blocked ditches in this area is also making the path muddy. 
3 3  3  3  3  3  3  2  3  2  4  2  4  45               
Page 108

Page 109

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-BK02 2 4 3 3 4 2 2 3 3 2 4 4 5 49.5
Auchantae Road - Buckie              
Buckie              
Most of this route runs on public roads, however the section that links to other
routes alongside the recycling centre is a barrier to access.  This section is
muddy, overgrown and has a steep section requiring fencing.  There is also a lot
of litter alongside the recycling centre. There are no waymarkers on this route, 2
waymarkers and a fingerpost required. 
2 4  3  3  4  2  2  3  3  2  4  4  5  49.5               
Page 109

Page 110

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-BK03 3 4 3 3 4 4 3 3 3 4 4 4 1 49.5
Laird’s Way - Buckie              
Buckie              
Drainage and surfacing required on the farm track before the A98 to improve
access. The path and bridge across the Burn of Buckie also needs work to
improve access. Invasive Japanese knotweed may cause complications in
undertaking work here. Waymarkers required along route. Fairly short path but
easily access from Buckie. 
3 4  3  3  4  4  3  3  3  4  4  4  1  49.5               
Page 110

Page 111

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-BK04 2 4 3 3 3 4 3 4 3 4 2 2 1 41.5
NCN Route 1 - Buckpool to Findochty              
Buckie              
This is a long route and runs mostly on tarmac roads and paths. Some additional
Give Way signage at road crossings required. There are some wet sections and
encroaching vegetation near the golf course in need of attention. The route
through Buckie is good. Some raised kerbs as barriers for pedestrians. There is a
section of path at Linn Crescent next to the roundabout where bikes have to
cycle onto coming traffic, this can be avoided if a new section of path goes 30m
across a grass strip. 
2 4  3  3  3  4  3  4  3  4  2  2  1  41.5               
Page 111

Page 112

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-BK05 2 3 2 3 4 2 3 3 3 2 3 2 1 37.5
Seaview Road path - Buckie              
Buckie              
This route has no waymarkers and requires several to navigate the streets. The
aggregate path near golf course is overgrown with gorse and has some muddy
sections.  Some raised kerbs as barriers along the street section. 
2 3  2  3  4  2  3  3  3  2  3  2  1  37.5               
Page 112

Page 113

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-BK06 3 3 2 3 4 2 3 3 3 2 2 2 1 36.5
Cemetery Path - Buckie              
Buckie              
This route mostly runs on tarmac and aggregate surfaces.   There are no
waymarkers on this route, several required to navigate. There is encroaching
vegetation and a muddy section at the west side and a small footbridge that
requires anti-slip.  3  3  2  3  4  2  3  3  3  2  2  2  1  36.5               
Page 113

Page 114

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-BK07 2 3 2 3 4 2 3 4 3 2 1 2 1 34.5
Barhill Road Path - Buckie              
Buckie              
This route requires waymarkers.  Some raised kerbs as barriers and missing
tactile paving at crossings, however this route runs on tarmac paths with good
surfaces.  2  3  2  3  4  2  3  4  3  2  1  2  1  34.5               
Page 114

Page 115

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-BK08 3 3 3 3 3 2 3 3 3 2 3 3 1 40
Mill of Buckie Path - Buckie              
Buckie              
About 50% of this route is muddy.
The aggregate section near the roundabout has a lot of puddles and drainage
issues. The new housing estate has drainage outlets onto the track and there are
no ditches. There are also no street lights on this aggregate section. Waymarkers
are required on this route. 
3 3  3  3  3  2  3  3  3  2  3  3  1  40               
Page 115

Page 116

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-BK09 3 4 3 4 3 2 3 3 4 3 3 3 4 48.5
Buckie Burn Corridor Path - Buckie              
Buckie               
This route will always limit access due to its hilly terrain.  The grassland section
in the South near Greenlaw Lane has no constructed path and requires
development. There are some steep sections before arriving at Queen Street
Park, a handrail would improve access here. Steps here are a barrier to access
which cannot really be resolved. Japanese Knotweed is a problem around the
small footbridge here, the bridge itself requires anti-slip on the decks. The path
nearby St. Peters has a couple of sections removed from the fence and has some
dead branches in trees here requiring attention. Southern section across field
needs path defined by grass cutting and potential to develop as an active travel
path.
The northern section on Union Terrace has no street lights. Additional
waymarkers are required along this whole route. 
3 4  3  4  3  2  3  3  4  3  3  3  4  48.5               
Page 116

Page 117

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-BK10 3 4 4 4 3 1 4 4 4 2 2 3 1 43
Buckie High School Safe Routes              
Buckie              
This route runs on tarmac surfaces and has good access. Some encroaching
vegetation and a leaning wire stock fence at the Highfield Road end needs
attention. Some raised kerbs are barriers and dropped kerbs are missing tactile
paving. The path from South Pringle Street to Duguid Street would benefit from
street lighting. There is also a muddy section at Allhallows Lane. There are no
waymarkers on this route, additional waymarkers can be accommodated on
lamp posts. 
3 4  4  4  3  1  4  4  4  2  2  3  1  43               
Page 117

Page 118

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-BK11 2 4 2 4 3 1 4 4 4 2 3 1 1 39
Millbank Primary Sch Safe Routes -Buckie              
Buckie               
Most of this route runs on tarmac surfaces and public road pavements. The
Southern aggregate section near Archibald Grove is however muddy and almost
all grass, street lighting on this section would improve access. There is a clothing
bank on half the pavement outside Millbank Primary and some encroaching
vegetation on the street sections, mainly from shrubs.
The grass section next to the playing fields is muddy and has vehicles using this
area. There are no waymarkers on the route, several required to navigate the
streets. There are two short metal bollards near Millbank Primary that are a trip
hazard. Several raised kerbs as barriers and dropped kerbs without tactile
paving.  The car parking area at Millbank Primary has a fence that requires
people to walk around the parking area, a gate would improve access here. 
2 4  2  4  3  1  4  4  4  2  3  1  1  39               
Page 118

Page 119

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-BK12 1 3 3 3 4 1 3 3 3 1 1 1 1 30
Freuchny Stripe - Buckie              
Buckie              
This route runs on tarmac pavements. There are several raised kerbs as barriers
and missing tactile paving at dropped kerbs.  Some encroaching vegetation
needs cut back, mostly hedges and shrubs on a short section. This route is not
waymarked, several waymarkers required to navigate the streets. 
1 3  3  3  4  1  3  3  3  1  1  1  1  30               
Page 119

Page 120

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-BK13 2 4 2 3 3 3 3 3 3 3 3 1 1 38
Cluny Path - Buckie              
Buckie               
The east side of North High Street has most of the issues on this route.
This route runs on tarmac path with street lights. However access is being
restricted by overgrown vegetation and a blocked drain making the path muddy
and slippery in winter at one end. There is good community presence here with
bird feeders and signage. Route needs regular maintenance of vegetation and
the blocked drain fixed. Some dead trees/branches also needs attention on this
route. This route requires waymarkers. The west side of the route has some
raised kerbs as barriers, a mapboard that is difficult to see through the plastic
and the Speyside Way start area could do with street lighting. 
2 4  2  3  3  3  3  3  3  3  3  1  1  38               
Page 120

Page 121

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-BK14 3 4 3 4 3 1 3 3 3 2 4 3 3 46
Old Station Yard Path - Buckie              
Buckie               
This route runs on tarmac paths with street lighting. The section up the hill has
encroaching vegetation that is narrowing the path. There are old bollards on the
path with missing and broken reflectors. This route requires way markers. There
are two raised kerbs as barriers.
This route has a notice about Sasha's Meadow at the southern end, grass cutting
will have to be discussed with the community before anything is strimmed 
3 4  3  4  3  1  3  3  3  2  4  3  3  46               
Page 121

Page 122

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-BK15 1 3 3 3 4 1 2 3 3 1 3 2 4 39
Cliff Terrace Paths - Buckie              
Buckie               
Most of this route runs on public road pavements and are in good condition.
However the section on grass from Linn Avenue to Linn Court is badly overgrown
and a barrier to access, this section also has no street lighting.
The aggregate track section that also runs on Linn Court has muddy sections on
and the narrow aggregate path near Linn Court is mostly muddy.
Waymarkers required in this route and several raised kerbs as barriers and
dropped kerbs without tactile paving. 
1 3  3  3  4  1  2  3  3  1  3  2  4  39               
Page 122

Page 123

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-BK16 1 3 3 3 3 1 3 3 3 1 2 1 1 31
Highland Yards Estate Route - Buckie              
Buckie              
A short path with a new car park area and houses. The route is not waymarked,
several waymarkers required. Street lighting on the aggregate section would
improve access .Aggregate path narrowed by grass at northern end. 
1 3  3  3  3  1  3  3  3  1  2  1  1  31               
Page 123

Page 124

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-BK17 4 4 4 3 3 3 3 3 3 3 4 4 4 53
Rathven Burn Path - Buckie              
Buckie               
Access on this route is limited by the steep terrain, however changes could
improve access. There is a short steep section at the northern end joining the
cycle path. Steps with a side section to roll up a bike would improve access here.
The route has some muddy sections and encroaching vegetation that need
addressing as well as some steep banks. The Southern end up to the cemetery is
steep and requires a fence/handrail.  The tarmac surface here has a lot of moss
on it. There are no waymarkers for this route, fingerposts required each end and
waymarkers to navigate the various other paths. 
4 4  4  3  3  3  3  3  3  3  4  4  4  53               
Page 124

Page 125

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-BK18 1 3 4 3 4 3 3 4 3 4 2 1 1 39
Portessie Railway Path              
Buckie              
This route runs on tarmac paths. There are no waymarkers on the route,
waymarkers required to navigate the route. The timber footbridge is slippery
when wet and could do with new anti-slip deck boards. Give way signage
required at the two road crossings and tactile paving. 70% of this route has
street lighting, 2-3 additional lamp posts would improve access. Some
encroaching vegetation to be cut back from lamp posts and from the Eastern
side of route. 
1 3  4  3  4  3  3  4  3  4  2  1  1  39               
Page 125

Page 126

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-BK19 4 4 4 3 3 1 3 2 3 1 4 4 5 49.5
Rathven Burn Link - Buckie              
Buckie              
This route is muddy and overgrown in places. Fencing is required at the steep
edge to the water. This route will need strimmed annually to keep the route
accessible. The steps at the bridge are badly overgrown and need vegetation
removed. Waymarkers required at each end. This route has no street lighting,
adding a light would improve access. 
4 4  4  3  3  1  3  2  3  1  4  4  5  49.5               
Page 126

Page 127

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-BK20 1 3 3 2 4 2 2 3 2 4 1 1 1 31
NCN Route 1 - Findochty              
Buckie              
As a cyclist this route runs on public roads and has one left turn junction. As a
pedestrian there are 2 road crossings and several raised kerbs and dropped kerbs
without tactile paving. Additional waymarkers required. Existing cycling
waymarkers can get confusing as other routes branch off of this route. 
1 3  3  2  4  2  2  3  2  4  1  1  1  31               
Page 127

Page 128

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-BK21 1 4 2 3 4 2 3 4 3 3 1 1 1 34
Buckie High Street              
Buckie              
This route runs on public pavements.  There are some missing tactile paving at
dropped kerbs and the road crossing at Cluny Square is unprotected and has
raised kerbs.  1  4  2  3  4  2  3  4  3  3  1  1  1  34               
Page 128

Page 129

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-CU01 0 3 1 3 4 2 2 3 3 4 1 0 1 28.5
NCN Route 1- Admiralty St Path - Pknocki              
CULLEN              
This route runs on public roads and pavements. As a cyclist the route is one
tarmac street with no barriers. As a pedestrian there are 2 road crossings
requiring tactile paving and one raised kerb as a barrier. 
0 3  1  3  4  2  2  3  3  4  1  0  1  28.5               
Page 129

Page 130

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-CU02 3 4 5 3 3 4 4 4 3 4 3 4 4 55
NCN Route 1 - Portknockie to Cullen              
CULLEN               
This route runs on aggregate paths that are becoming very muddy in places. One
third of the route at the western end has muddy sections. There is an
overflowing ditch in one section adding drainage issues to the path. There is a
muddy section at the far west of the route across Bridge Street in Portknockie,
and from Bridge Street to the golf course. Some steep banks require fencing and
grass is encroaching at the edges of the path narrowing the route. 
3 4  5  3  3  4  4  4  3  4  3  4  4  55               
Page 130

Page 131

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-CU03 3 4 4 4 3 4 3 4 4 4 3 3 3 52
NCN Route 1 - Cullen to Lintmill              
CULLEN              
This route runs mostly on public roads and pavements.
This route has a range of waymarkers on this route, some are for cyclists and
other for walking, it can seem confusing at times. Extra waymarkers are required,
it may require a review to optimise where they are placed.   There are a few
raised kerbs on this route. The roadside track to Lintmill is in need of
maintenance as the path is narrowing and has encroaching branches in places. 
3 4  4  4  3  4  3  4  4  4  3  3  3  52               
Page 131

Page 132

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-CU04 0 2 3 2 4 3 2 3 2 3 1 1 1 29
Lintmill to Crannoch Road              
CULLEN              
This route runs on public roads and is easily accessible. Some tree assessments
on road side trees required.  0  2  3  2  4  3  2  3  2  3  1  1  1  29               
Page 132

Page 133

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-CU05 3 2 3 2 3 3 3 2 2 2 4 4 4 45
Crannoch Circular Path - Cullen              
CULLEN               
This path could be a brilliant cycle route but is limited by two narrow gates and
an overgrown and forest section requiring maintenance. Waymarking required
as in parts route is not obvious. Fallen trees need removed. 
Half of this route runs on good vehicle tracks. 3 large trees have fallen in the
forest section blocking the path and short makeshift paths go around them.
There are a lot of dead and damaged trees in the forest. Some barriers required
at one of the bridge areas. There are gates in the forest section that are
overgrown as well as a narrow gate at the other end near the playpark coming
off the vehicle track. There are some muddy sections in the forest as well as
leading down to the playpark at the end of the route. As this route briefly leaves
Moray, the track has waymarkers leading back onto the path and is easy to
follow.  Waymarker and fingerpost maintenance required. 
3 2  3  2  3  3  3  2  2  2  4  4  4  45               
Page 133

Page 134

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-CU06 3 3 2 3 3 3 3 3 3 3 2 3 1 39
Cullen Coastal Path              
CULLEN              
This route runs on wide aggregate paths with good waymarking and all ability
access. Some exposed steep drops need fencing. However the far east section is
not all ability and has some muddy and uneven ground. Overall the majority of
the route has good access. 
3 3  2  3  3  3  3  3  3  3  2  3  1  39               
Page 134

Page 135

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-CU07 1 3 3 2 3 2 2 2 2 2 2 1 1 29
Seaview Path - Cullen              
CULLEN              
This route will always have a limit to access due to its steep terrain.  However 
the route runs mostly on tarmac surfaces and public roads and has street lighting
and handrails on the steep section. Two fingerposts need replaced at the Logie
Drive end and the steep path down to the harbour has a metal fence requiring
repairs and some exposed rock/derelict building requiring further assessment for
stability. 
1 3  3  2  3  2  2  2  2  2  2  1  1  29               
Page 135

Page 136

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-CU08 1 3 3 3 3 3 3 3 2 2 1 2 1 32.5
Nelson Point Path - Cullen              
CULLEN              
This route is all on wide aggregate and has good drainage.  Some barriers
required to steep banks and waymarking around a side path. Ditches will need
maintenance to keep the path dry.  1  3  3  3  3  3  3  3  2  2  1  2  1  32.5               
Page 136

Page 137

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-CU09 1 2 3 3 3 3 3 2 2 2 1 2 1 30.5
Salmon Bothy Path - Cullen              
CULLEN              
The steep terrain will always limit access on this path. Adding a hand rail would
improve access.  1  2  3  3  3  3  3  2  2  2  1  2  1  30.5               
Page 137

Page 138

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-DA01 2 3 2 3 3 4 4 4 3 4 2 2 1 40.5
Dava Way - Mannachie Section              
Dava Way              
This route has a few muddy sections and encroaching grass narrowing the
aggregate path on the section South of Mannachie Avenue. There is a steep
bank requiring fencing at a bridge in the Southern Woodland section and some
additional waymarkers required along the path. A fingerpost and mapboard at
Mannachie Avenue have rot and are in poor condition. The route at Mannachie
Avenue continues North to Forres High Street. 
2 3  2  3  3  4  4  4  3  4  2  2  1  40.5               
Page 138

Page 139

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-DA02 2 2 3 2 3 4 3 4 2 4 2 2 1 37.5
Dava Way - Romach Section              
Dava Way              
Some muddy sections to address on this route as well as maintenance on
ditches. Further inspection of path side trees. Pruning and strimming also
required, especially around waymarkers. Barriers to steep banks also required as
there are some long exposed sections. Old stone bridges need further inspection
as showing water erosion where watercourses flow.  There is a short rocky
section where material has fallen down from cliffs at side of path, this will need
further inspection. 
2 2  3  2  3  4  3  4  2  4  2  2  1  37.5               
Page 139

Page 140

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-DA03 3 2 3 2 3 4 3 4 2 4 2 2 1 38.5
Dava Way - Drumine Section              
Dava Way               
Sections of track are becoming muddy and some barriers required at bridges and
steep banks. Fencing repairs required to keep sheep off the track. At one end of
this route near to CPN-DA02 there is an aggregate area that is being used as a car
park, it is busy and allows easy access but could be developed with signage for
both vehicles and cyclists walkers as vehicles pass walkers/on the path. 
3 2  3  2  3  4  3  4  2  4  2  2  1  38.5               
Page 140

Page 141

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-DA04 2 2 3 2 3 4 3 4 2 4 2 2 1 37.5
Dava Way - Longley Section              
Dava Way              
The route has some muddy sections of track that need addressed before they get
any worse, they are not barriers to access but will not get better.  There are also
a number of bridges that require barriers due to the height of the exposed drop
as well as some steep banks. A section of fence where cattle have been getting
onto the path also need repairs. 
2 2  3  2  3  4  3  4  2  4  2  2  1  37.5               
Page 141

Page 142

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-DA05 2 2 3 2 3 4 2 3 2 4 2 3 1 37
Dava Way - Dunphail to Dava Section              
Dava Way               
Top of route has a diversion for cyclists and horses onto the busy A940. A
mapboard and signage is present before entering and exiting Moray /Highland
boundary. Sections of path require drainage and ditches dug. Barriers at steep
banks and bridges required for safety with some very high drops exposed at
bridges. Vegetation and pruning required along whole path. There is a lack of
parking at the Dava end and information about where to park. 
2 2  3  2  3  4  2  3  2  4  2  3  1  37               
Page 142

Page 143

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG01 1 3 2 3 3 0 3 4 3 2 2 1 1 31
Miltonduff School Safe Route              
ELGIN              
This route runs on tarmac surfaces. There is an overgrown section of pavement
near the distillery as a barrier. Waymarkers required and advisory Give Way
signage and tactile paving at road crossings would improve safety and
consistency with the rest of the cycle path network. 
1 3  2  3  3  0  3  4  3  2  2  1  1  31               
Page 143

Page 144

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG02 1 0 3 2 2 3 3 4 2 2 2 1 1 29
Torrieston Walks All Abilities trail              
ELGIN              
This all ability path has high accessibility. A couple of dead trees near the path
need further assessment. There is 1 bench and 1 picnic table with slight
movement and the boardwalk could do with maintenance. A couple of muddy
areas and encroaching vegetation but overall a very good path. 
1 0  3  2  2  3  3  4  2  2  2  1  1  29               
Page 144

Page 145

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG03 2 4 3 3 3 3 3 4 3 3 3 1 1 40
Lossie to Elgin Cycle Way              
ELGIN               
This route runs on tarmac surfaces and is well used. Missing Give Way signage
and tactile paving at road crossings would improve safety and access. Some
patches of vegetation requiring to be maintained. Some new road crossings will
be added after construction is complete at Findrassie. Existing waymarkers are
mostly in one direction with one facing the wrong direction, additional
waymarkers required. Footbridge at Findrassie has broken handrail. The path
beyond Findrassie to Lossiemouth is aging and the tarmac section past the
barrier bend beyond Findrassie has some lumpy sections and drainage issues. A
water pipe on the larger footbridge needs taken off the walkway. Recent
roadside side let ditches will drain water onto path, this is allowing wet areas to
appear. An old fence runs along most of this path which is does not affect the
path but is in poor condition. 
2 4  3  3  3  3  3  4  3  3  3  1  1  40               
Page 145

Page 146

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG04 3 3 4 3 3 4 4 2 3 2 3 2 4 46
Quarrel Wood Paths - Elgin              
ELGIN               
The hilly terrain on this route will always limit access, however some sections of
the path are uneven with raised roots and overgrown. The route requires
waymarkers to navigate the core path route, there are many paths. Vegetation
control and drainage needs addressed on many sections of the core path along
with some very muddy sections.  Several trees were reported to FLS for clearing. 
3 3  4  3  3  4  4  2  3  2  3  2  4  46               
Page 146

Page 147

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG05 3 3 2 3 3 2 3 2 3 2 3 3 4 42.5
Fairway Path - Elgin              
ELGIN               
Half of this route runs on a tarmac vehicle track the other is on a woodland path.
This path requires waymarkers. Parts of this route are overgrown and muddy
when wet and there are some uneven root sections. Maintenance is required on
damaged barbed wire fences and golf course warning signs required.
Resurfacing and cutting back vegetation would improve access. 
3 3  2  3  3  2  3  2  3  2  3  3  4  42.5               
Page 147

Page 148

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG06 3 3 3 3 3 3 3 3 2 3 4 3 4 47.5
Old Railway Path - Elgin              
ELGIN              
Half of this route is very muddy when wet and a barrier to access. The other half
still has muddy sections but is not as wet. Encroaching grass and broom needs
maintained and a few dead branches need removed.  Waymarkers required.
Resurfacing and drainage would improve access. 
3 3  3  3  3  3  3  3  2  3  4  3  4  47.5               
Page 148

Page 149

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG07 3 3 2 3 2 3 3 2 2 2 3 3 4 41.5
Birkenhill Wood Paths - Elgin              
ELGIN               
This route requires waymarkers.  The car park area could be developed to make
it suitable for vehicles, currently it looks like a muddy turning circle on private
property. The forest walks are very scenic and require a light pruning back of
branches and possibly strimming of bracken in August time. There are some
muddy/uneven root sections that would benefit from resurfacing. Out of control
dogs seem to be a problem in this area due to signage. 
3 3  2  3  2  3  3  2  2  2  3  3  4  41.5               
Page 149

Page 150

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG08 3 3 4 3 3 3 4 3 3 2 4 3 4 49.5
Spynie Wood Paths - Elgin              
ELGIN              
This route is quite flat but half of it has a lot of muddy sections and encroaching
vegetation. Waymarkers are required as it is quite easy to join one of the many
side paths. This path could be all ability however some really muddy sections are
barriers.  Several trees on this section have been reported to FLS to assess
further. 
3 3  4  3  3  3  4  3  3  2  4  3  4  49.5               
Page 150

Page 151

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG09 3 3 4 3 4 2 3 3 3 2 3 3 4 46.5
Duffus Road to Brumley Brae Link - Elgin              
ELGIN              
This route has some narrow, muddy, overgrown sections and some raised kerbs
that limits access.  There are no waymarkers making this route difficult to find
and navigate.  At each end there are sections where the path is undefined
running across grass and between trees. Encroaching vegetation such as bracken
may make the path very narrow in Summer/Autumn. Addressing the muddy
sections, cutting back vegetation and adding waymarkers would improve the
route. 
3 3  4  3  4  2  3  3  3  2  3  3  4  46.5               
Page 151

Page 152

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG10 3 4 3 3 3 3 4 4 3 4 3 3 3 49
NCN Route 1 - Brumley Brae              
ELGIN               
This route has an new section that runs from the Cooper Park up to Elgin
Academy in good condition. There are issues going past Elgin Academy where
the path splits at CPN-EG11 - here the path is narrow, muddy, overgrown and
has steep banks with dead trees at the sides. The road crossing over Morriston
Road is a barrier as a grass bank and raised kerbs are present. Ground lighting
on the new section from the Cooper Park looks to be in poor condition - lighting
this new section would improve access. Waymarkers are required to navigate
this route, especially around Elgin Academy and Morriston Road. 
3 4  3  3  3  3  4  4  3  4  3  3  3  49               
Page 152

Page 153

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG11 2 4 2 4 4 1 3 3 4 2 1 1 1 34
Lang Walk - Elgin              
ELGIN              
A good access route with 1 steep hill that may cause a barrier.  This route runs
on tarmac surfaces and has tactile paving at all road crossings. Waymarkers
required to navigate the route. 1 bollard is missing a Give Way sign, some
encroaching vegetation near the top of the route near CPN-EG09 and a short
section has no street lighting however this section runs up to the woodland area
beyond the route. 
2 4  2  4  4  1  3  3  4  2  1  1  1  34               
Page 153

Page 154

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG12 1 4 3 3 4 1 3 4 3 3 1 1 1 34
Duffus Road Path - Elgin              
ELGIN              
This short route runs on public pavements. Fingerposts/waymarkers required at
each end and a Give Way signage bollard at the junction to Hamilton Drive. 
1 4  3  3  4  1  3  4  3  3  1  1  1  34               
Page 154

Page 155

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG13 1 4 3 3 3 1 3 3 3 3 3 1 1 36
Bishopmill School Path/LadiesWalk -Elgin              
ELGIN               
This route runs two thirds on tarmac paths, the other third is an aggregate path.
The route has two hills that will limit access.  The lowest tarmac path by the 
River Lossie is good quality with a number of dead trees requiring further
assessment. This lower section is missing street lighting that would improve
access. The middle aggregate section is overgrown in places, requires drainage
and is missing a fence barrier to a steep slope. The existing fence barrier needs
repairs and is quite low. The top tarmac section has good access with a steep hill
that will limit access. There are several dead trees on this route requiring
inspection. 
1 4  3  3  3  1  3  3  3  3  3  1  1  36               
Page 155

Page 156

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG14 2 3 1 3 2 2 3 1 3 2 2 1 1 29
Dr Gray’s Link - Elgin              
ELGIN              
This routes access is limited by the steep terrain and has a set of historic steps in
the middle that limits access as well as modern metal steps. There is a closed
bridge over the River Lossie that blocks access, however there is another bridge
5 minutes along CPN-EG16 path. The section of path that runs South to Dr Grays
hospital has good access. Adding street lighting to the section of path at Mary
Well would improve access on a busy school route. Waymarkers and tactile
paving at dropped kerb areas required. 
2 3  1  3  2  2  3  1  3  2  2  1  1  29               
Page 156

Page 157

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG15 3 3 3 3 2 2 3 3 3 2 3 3 4 43.5
Morriston Path - Elgin              
ELGIN              
Most of this path runs on an earth and aggregate track. This earth section is
muddy in places and has encroaching vegetation and an eroding section next to
the river. There are a number of paths that weave through the trees to avoid the
issues on the path. This path has a short good quality tarmac section. Some dead
trees to assess/remove and waymarkers required. Resurfacing sections of this
path/adding drainage and defining the actual path in places would improve
access. 
3 3  3  3  2  2  3  3  3  2  3  3  4  43.5               
Page 157

Page 158

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG16 3 3 4 3 3 2 3 3 3 2 3 3 4 45.5
Old Mills Path - Elgin              
ELGIN              
Half this route runs on new tarmac surfaces in excellent condition. The other
eastern half runs on muddy aggregate and earth paths that get narrow at times
and uneven, there are a number of dead trees on this section as well. Street
lighting along the whole of this route would improve access and safety bring a
route used by the school. Current ground lighting on the new tarmac section
does not look to be in working condition. Waymarkers required and repairs to
existing fences. A new fence is required on a section of path that runs close to
the river. 
3 3  4  3  3  2  3  3  3  2  3  3  4  45.5               
Page 158

Page 159

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG17 0 4 1 3 4 3 4 4 3 4 1 0 1 33.5
Boroughbriggs Cycle Link - Elgin              
ELGIN              
This route runs on public roads and pavements. Waymarkers requires to
navigate streets. Some gravel is encroaching onto to the cycle path on Haugh
Road and a narrow section in North Street is due to construction works and
commercial bins.  Tactile paving at dropped kerbs would improve access. 
0 4  1  3  4  3  4  4  3  4  1  0  1  33.5               
Page 159

Page 160

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG18 0 4 1 3 2 4 4 4 3 3 1 0 1 31.5
Elgin Town Centre Pedestrian Precincts              
ELGIN              
Waymarkers required to navigate streets. Barriers in Fife Arms Close due to bins
narrowing path, also bins narrowing the cycle path up to South Street. 
0 4  1  3  2  4  4  4  3  3  1  0  1  31.5               
Page 160

Page 161

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG19 0 3 1 3 2 4 4 4 3 3 1 0 1 30.5
Thunderton Place - Elgin              
ELGIN              
This route requires some waymarking to navigate the streets. Existing fingerpost
needs waymarking fingers checked for direction. Dropped kerbs at the road
crossing at Batchen Street is missing tactile paving. 
0 3  1  3  2  4  4  4  3  3  1  0  1  30.5               
Page 161

Page 162

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG20 0 3 1 3 2 4 4 4 3 3 1 0 1 30.5
Elgin High Street              
ELGIN              
This route runs on public pavements. Waymarkers required at each end and the
large metal fingerpost in the middle of the path needs finger directions checked. 
0 3  1  3  2  4  4  4  3  3  1  0  1  30.5               
Page 162

Page 163

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG21 0 3 1 3 2 4 4 4 3 3 1 0 1 30.5
Lossie Wynd - Elgin              
ELGIN              
This route runs on public road pavements.  Waymarkers required to follow
route and tactile paving required at one road crossing. Advisory Give Way
signage near the Cooper Park section will keep all crossings consistent. Bicycles
can cycle South on Lossie Wynd which is the opposite way to cars on a one way
street, additional warning to motorists would improve safety, bicycle lane road
markings are also getting worn on this section. Waymarker at the top of Lossie
Wynd is pointing in the wrong direction. 
0 3  1  3  2  4  4  4  3  3  1  0  1  30.5               
Page 163

Page 164

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG22 0 3 1 3 2 4 4 4 3 3 1 0 1 30.5
High Street to Cooper Park Link - Elgin              
ELGIN              
A short route on tarmac pavements and roads. Waymarkers required to navigate
the route. Street lighting from the Cooper Park to the A96 bridge would improve
access. Missing tactile paving at dropped kerbs and a raised kerb near the High
Street. The alleyway before the High Street is unpleasant in the wet, it has
overflowing roof gutters that create a lot of falling water when raining and
bollards needs attention, one is a trip hazard. 
0 3  1  3  2  4  4  4  3  3  1  0  1  30.5               
Page 164

Page 165

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG23 1 3 1 3 3 3 4 4 3 2 1 1 1 32
Cooper Park Paths - Elgin              
ELGIN              
These paths runs on tarmac surfaces and have good accessibility for multi-use.
Adding lighting to all the paths would improve access, the northern section and
the central path have no lighting.
There are some dead branches in poplar trees above the path in the north
section as well as some large puddles across the tarmac requiring attention.
Waymarkers would improve navigating around the park. 
1 3  1  3  3  3  4  4  3  2  1  1  1  32               
Page 165

Page 166

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG24 1 3 2 3 2 3 4 3 3 2 1 1 1 31
Cathedral and Brewery Bridge Link -Elgin              
ELGIN              
This short route runs on tarmac pavements and surfaces. There are two raised
kerbs as barriers and some dropped kerbs missing tactile paving. Some
additional waymarkers required. One fingerpost has a waymarker facing the
wrong direction and street lighting near the bridges would improve access. 
1 3  2  3  2  3  4  3  3  2  1  1  1  31               
Page 166

Page 167

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG25 2 4 2 3 3 2 3 3 3 1 3 2 4 41
Deanshaugh Path - Elgin              
ELGIN              
This route is very scenic and is well used, wildlife such as otters are present here.
This route mostly runs on aggregate and tarmac paths. There are some
muddy/large puddles on the aggregate path on the north section. In the
Northern section, before the bend on the river, the path has encroaching
vegetation and muddy sections that will limit access. There is a steep river bank
that requires a barrier fence neat this area and there are some broken sections
on the existing fence leading down to Kingsmill Court. This path leading to
Kingsmill Court may also require grass cutting in the summer. Waymarkers are
required on this route, especially around the Kingsmill Court area leading onto
the cycle path. 
2 4  2  3  3  2  3  3  3  1  3  2  4  41               
Page 167

Page 168

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG26 0 3 1 3 2 4 4 4 3 2 2 0 1 31.5
NCN Route 1 - Deanshaugh - Elgin              
ELGIN              
This route crosses Lesmurdie Road at one end. As a cyclist this crossing can be
difficult due to the busy road. As a pedestrian, crossing at the junction is not
easy due to raised kerbs. A safer crossing for all is 40m East via an island
crossing with dropped kerbs. The remainder of this route requires waymarking
and vegetation cut back on the hill to the Cooper Park. A steep hill there may
require a hand rail for pedestrians. 
0 3  1  3  2  4  4  4  3  2  2  0  1  31.5               
Page 168

Page 169

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG27 0 3 1 2 3 1 4 4 2 2 2 0 1 27.5
Linksfield Path - Elgin              
ELGIN              
A short route that requires waymarkers and has some encroaching vegetation.
Access for pedestrians has a raised kerb as a barrier. Some faded Give Way road
markings need renewing and a missing Give Way sign is required 
0 3  1  2  3  1  4  4  2  2  2  0  1  27.5               
Page 169

Page 170

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG28 0 4 1 3 3 2 4 4 3 3 2 0 1 32.5
Bishopmill Path - Elgin              
ELGIN               
This route runs on tarmac and public road pavements and roads. Waymarkers
required to navigate routes and some drainage on the riverside section where
water has been making the edges of the path muddy. The riverside section has
bollards that require reflectors and additional bollards to stop vehicles using the
path. Some branches need cut back from lamp posts on the riverside section and
a hedge is encroaching the path here.  Whole path has street lighting. 
0 4  1  3  3  2  4  4  3  3  2  0  1  32.5               
Page 170

Page 171

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG29 0 3 1 3 3 2 3 4 3 2 2 0 1 29.5
Lesmurdie Road Cycle Path - Elgin              
ELGIN              
This route runs on public pavements.  Road crossings need Give Way signage and
are missing tactile paving. Some sections have encroaching vegetation. The
section of this route at Lossiemouth Road needs attention as the cycle path ends
at the busy junction on the wrong side of the road, this area is a barrier for
access.  0  3  1  3  3  2  3  4  3  2  2  0  1  29.5               
Page 171

Page 172

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG30 0 4 1 3 3 1 2 4 2 3 1 0 1 26.5
Spynie Cycle Link - Elgin              
ELGIN               
This route runs on tarmac surfaces, public road pavements and roads. One short
section requires street lighting. Additional waymarkers are required to navigate
the streets, waymarking has been done in one direction making it less easy to
navigate in the opposite direction. Adding tactile paving at dropped kerbs and
Give Way signage at road crossing would improve access and safety and make
this consistent with newer cycle paths in Elgin. Some sections have encroaching
vegetation in need of maintenance. A new section of pavement at the junction
before CPN-EG03 may result in cyclist missing out the last section of path. 
0 4  1  3  3  1  2  4  2  3  1  0  1  26.5               
Page 172

Page 173

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG31 3 3 3 3 3 2 3 3 3 2 4 2 4 45
Outer Edge Path - Elgin              
ELGIN              
Most of this path is muddy when wet. The route is has encroaching grass and
branches a d has no waymarkers. The route appears well used as the path is
worn and encroaching grass has been flattened. Resurfacing, cutting back
vegetation and adding waymarkers would improve access and quality. 
3 3  3  3  3  2  3  3  3  2  4  2  4  45               
Page 173

Page 174

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG33 5 4 2 3 2 2 4 5 3 4 5 5 5 59
Spynie Path - Elgin              
ELGIN               
This short woodland path is muddy, overgrown and difficult to navigate. There
are a number of dead trees and branches at the side of the path that needs
further assessment and there are no waymarkers on the route. The route
appears to be well used, however bikes have been making makeshift tracks that
pose a safety risk. The route being difficult to follow will need further checking
closer to Roseisle Drive to determine exactly where the path is supposed to go. 
5 4  2  3  2  2  4  5  3  4  5  5  5  59               
Page 174

Page 175

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG34 0 4 1 3 3 1 3 3 3 3 1 1 1 29
Bilbohall Farm Link - Elgin              
ELGIN              
A short path with street lights that requires waymarkers at each end and some
tactile paving at a road crossing with encroaching grass. 
0 4  1  3  3  1  3  3  3  3  1  1  1  29               
Page 175

Page 176

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG35 3 3 3 3 3 1 4 4 3 3 4 4 4 50
Fairfield Avenue Path - Elgin              
ELGIN              
Half of this path runs on public road pavements with good access.  The other half
has muddy sections as a barrier to access and a raised kerb. Waymarkers
required if travelling from The Wards direction. When wet the aggregate section
limits access.  3  3  3  3  3  1  4  4  3  3  4  4  4  50               
Page 176

Page 177

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG36 3 3 3 3 3 2 2 3 3 2 4 3 1 41
Hardhillock Path - Elgin              
ELGIN               
Most of this route runs on aggregate tracks and earth paths. Although fairly flat
there are a lot of muddy areas that will limit access during wet weather.
Resurfacing and drainage is required. There are no waymarkers on this route, a
fingerpost and several waymarkers are required to navigate the route. Vehicle
access is not restricted on the vehicle tracks, either adding gates or warning signs
required.  A raised kerb is a barrier near Fairfield Avenue in the northern section. 
3 3  3  3  3  2  2  3  3  2  4  3  1  41               
Page 177

Page 178

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG37 2 3 2 3 3 1 3 4 3 3 3 1 1 36
The Wards Paths - Elgin              
ELGIN               
This busy route has good access, however maintenance is required to maintain
the level of access. The quality of the path and furniture could be improved.
Muddy sections and encroaching vegetation are an issue. Broken waymarkers
and information/warning boards need attention and new
waymarkers/fingerposts required to link to other paths. The boardwalk is now
surrounded by water and a barrier would improve safety. There are some trees
requiring attention and further assessment. 
2 3  2  3  3  1  3  4  3  3  3  1  1  36               
Page 178

Page 179

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG38 0 3 1 3 4 1 3 4 3 2 1 0 1 27.5
Wards Back Path - Elgin              
ELGIN              
A straight path with good tarmac and street lighting. Missing tactile paving at
one end and some minor encroaching branches.  0  3  1  3  4  1  3  4  3  2  1  0  1  27.5               
Page 179

Page 180

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG39 3 3 3 3 3 2 3 4 3 3 5 3 4 50.5
Tyock Path - Elgin              
ELGIN              
This route runs on mostly tarmac pavements and roads. However about half of
this path runs on an overgrown aggregate path with no street lighting.
Waymarkers are required for this route. The road crossing at Edgar road is
missing dropped kerbs and tactile paving and is difficult to cross when the road is
busy. The path beside B and Q has vegetation encroaching on the path and lamp
posts. The path near Bailies Drive has encroaching vegetation and muddy
sections. 
3 3  3  3  3  2  3  4  3  3  5  3  4  50.5               
Page 180

Page 181

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG40 0 3 1 3 4 1 3 3 3 2 1 0 1 26.5
Edgar Road Path - Elgin              
ELGIN              
A straight wide cycle path with a car park and street lighting. A waymarker
required at one end.  0  3  1  3  4  1  3  3  3  2  1  0  1  26.5               
Page 181

Page 182

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG41 1 4 1 3 3 2 4 4 3 3 1 1 1 33
Springfield Link - Elgin              
ELGIN               
This route runs on tarmac paths, half of which has street lighting, adding more
street lighting would improve access when dark. There are missing Give Way
bollards/signage at some road crossings, the road crossing at Edgar Road can be
difficult when the road is busy. On the Glen Moray Drive path section there is a
short area where a large puddle forms and encroaching grass/earth that is
narrowing the path around The Mews road area. The Southern section that runs
beside Sandy Road is missing Give Way signage at road crossings and additional
waymarkers to navigate the streets. 
1 4  1  3  3  2  4  4  3  3  1  1  1  33               
Page 182

Page 183

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG42 1 4 1 4 4 1 4 4 3 3 1 1 1 34
Greenwards/Elgin High School Safe Route              
ELGIN              
This route runs on good tarmac paths with street lighting. Additional
waymarkers are required to navigate the streets. There are some path junctions
requiring advisory Give Way signage for cyclists. There are some short sections
of encroaching vegetation from neighbouring gardens. 
1 4  1  4  4  1  4  4  3  3  1  1  1  34               
Page 183

Page 184

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG43 2 3 2 3 3 2 3 2 3 2 3 2 4 40
Golf Course Path - Elgin              
ELGIN              
This route mostly runs on grass and earth paths that get muddy when wet. The
pavement section at the East has good access, however the earth/grass section
has no constructed path limiting access when wet, an aggregate path on the
earth/grass section would improve this. The boundary fence to the golf course is
in poor condition and golf course warning signs required. Waymarkers are
required to navigate this route. 
2 3  2  3  3  2  3  2  3  2  3  2  4  40               
Page 184

Page 185

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG44 0 3 1 3 4 1 2 3 3 3 1 0 1 26.5
Glass Green Path - Elgin              
ELGIN              
This route runs on wide tarmac paths and is highly accessible. There are some
sections where branches need cut back and additional waymarkers required
where other route connect. Tactile paving at road crossing would increase
access. Give way signage required at three road crossings where cyclists will
cross. The road crossing at the A941 is a busy road and would benefit from a
protected pedestrian crossing, however being at a round about this may not be
possible. 
0 3  1  3  4  1  2  3  3  3  1  0  1  26.5               
Page 185

Page 186

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG45 0 4 1 3 4 1 3 4 3 4 2 0 1 32.5
Thornhill Cycle Path - Elgin              
ELGIN              
This route runs on wide public road pavements. A fingerpost is pointing in the
wrong direction and additional waymarkers required at joining routes. Give way
signage required for cyclists at road junctions and tactile paving is missing on
some dropped kerbs. 
0 4  1  3  4  1  3  4  3  4  2  0  1  32.5               
Page 186

Page 187

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG46 2 3 2 3 3 1 3 4 3 3 2 1 1 34
Linkwood Path - Elgin              
ELGIN               
Half of this route runs on wide tarmac paths with street lighting, the other half
runs on unlit aggregate paths.  The Western tarmac path section has good
access. There are dropped kerbs missing tactile paving at Thornhill Drive and the
path approaching the A941 road has a dark area where additional street lighting
would improve safety. There are no waymarkers for this route, waymarkers and
fingerposts are required to navigate around the streets and junctions to other
paths. The area where the tarmac path joins the aggregate path in the Western
area has a section that is overgrown and muddy, restricting access when wet.
The bridge over the river near here requires repairs to the side netting and has
rot in the timber decks. A small culvert in this area requires fencing either side.
The aggregate path in the eastern section is mostly good, it has some bumpy and
muddy sections that may need attention to avoid them getting worse. There are
a lot of steep exposed banks to the river on the aggregate track that may require
fencing. There are a lot of dead and damaged trees requiring further assessment
alongside the aggregate track area. The road crossing at Linkwood road requires
signage and tactile paving. 
2 3  2  3  3  1  3  4  3  3  2  1  1  34               
Page 187

Page 188

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG47 2 3 1 3 3 1 3 3 3 2 2 1 1 31
New Elgin Primary Safe Routes              
ELGIN               
This route runs on tarmac surfaces with street lighting.  Waymarkers are
required to navigate the streets. There are bollards requiring reflectors at School
Brae and a raised kerb as a barrier at Robertson Drive/Rashcrook Walk area. Also
in this area additional street lighting on the path between the houses would
lighten a dark area. The large metal gate at New Elgin Road can close and jam
tight, as this gate is always open the gate is no longer required.  The tall stone
wall bordering the cemetery requires further assessment due to worn
stonework/missing stones.  The path at School Walk leading to Thornhill Road
has encroaching vegetation and a worn "SLOW" pavement marking sign where
the pavement goes from wide to narrow.  Neighbouring private fences in this
area require repairs before they affect the path. 
2 3  1  3  3  1  3  3  3  2  2  1  1  31               
Page 188

Page 189

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG48 0 4 1 3 3 1 3 4 3 3 2 1 1 32
Ashgrove Path - Elgin              
ELGIN               
This route runs on tarmac paths with street lighting. The Northern street section
near Ashgrove Road to the cycle path has some raised kerbs as barriers and two
short, muddy grass sections that are missing a constructed path. The tarmac
cycle path is good, there is a 10m section where a large puddle forms near the
railway bridge.  A waymarker is required near the Southern end at Reiket Lane. 
0 4  1  3  3  1  3  4  3  3  2  1  1  32               
Page 189

Page 190

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG49 0 3 1 3 4 1 3 4 3 3 1 0 1 28.5
Pinefield Playing Field Path - Elgin              
ELGIN              
Good quality cycle path with parking,  signage required to make this clearer.  0  3  1  3  4  1  3  4  3  3  1  0  1  28.5               
Page 190

Page 191

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG50 0 3 1 3 3 1 2 3 3 1 1 0 1 23.5
Waulkmill Grove Path - Elgin              
ELGIN              
Waymarkers required on this route. The path runs on wide tarmac paths that all
have street lighting. There are 2 bollards at one end of the street that leave a
narrow gap and the road crossing is missing tactile paving. 
0 3  1  3  3  1  2  3  3  1  1  0  1  23.5               
Page 191

Page 192

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG51 0 2 1 2 4 1 2 3 2 1 2 0 1 23.5
Urquhart Road Route - Lhanbryde              
ELGIN              
This route runs on public roads and pavements. The pavement sections in
Urquhart have some raised kerbs, narrow sections and encroaching vegetation
as barriers. Fingerposts/waymarkers are required at both ends of the route as
well as at the junction of CP-EG52. There is a broken wooden waymarker on the
route.  2 areas with large puddles on the public road require drainage. 
0 2  1  2  4  1  2  3  2  1  2  0  1  23.5               
Page 192

Page 193

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG52 3 2 4 3 3 3 3 2 3 3 4 4 4 49
Muiryhall Blackburn Route - Lhanbryde              
ELGIN               
About half of this long route runs on tarmac and aggregate and has good access.
The remaining half has issues with muddy and overgrown sections. Waymarkers
and fingerposts required across the whole route. There are two road crossings
across 60mph zones which can be difficult. The Lhanbryde section has a lot of
muddy, overgrown sections, half of the Loch na bo section is muddy and
overgrown in places. There are several dead trees at the sides of the path
requiring further assessment. The waymarkers at Loch na bo section are not
clear with faded colours. 
3 2  4  3  3  3  3  2  3  3  4  4  4  49               
Page 193

Page 194

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG53 3 1 3 3 3 3 3 1 3 2 3 3 1 37
Loch Na Bo Woodland Path - Lhanbryde              
ELGIN               
Access is limited on this route due to the terrain. Existing waymarkers have
small, faded colour bands so they mostly look the same, refreshing these would
improve navigating the route. There are many encroaching vegetation and
muddy sections that can be improved. There are two large dead trees next to
the path in the southern end of the route in need of further assessment and a
windblown area of trees across the path near the northern section. 
3 1  3  3  3  3  3  1  3  2  3  3  1  37               
Page 194

Page 195

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG54 0 2 1 2 4 1 2 3 2 1 2 0 1 23.5
Darkland Road Route - Lhanbryde              
ELGIN              
This route runs on public roads.  A fingerpost at one end is required and a private
electric fence that borders the road needs warning signs. The fingerpost at the
Crooked Woods entrance needs vegetation cut back as does the short section of
path there.  0  2  1  2  4  1  2  3  2  1  2  0  1  23.5               
Page 195

Page 196

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG55 3 2 4 3 3 3 3 2 3 2 3 4 4 46
Crooked Wood Paths - Lhanbryde              
ELGIN               
Additional waymarkers are required to navigate the many paths on this route.
Most of the existing waymarkers need replaced. There are a few steep sections
that limit access and could have steps installed. There is a lot of encroaching
vegetation and muddy sections, some are barriers to access. There are a few
dead and damaged trees requiring further assessment/work. A route change is
required, the section of path on the north west corner of the route no longer has
a path there. The current route joins to the road to Darklands rather than
continue East on a forest track, an amended route will be required if this is not
the desired route. 
3 2  4  3  3  3  3  2  3  2  3  4  4  46               
Page 196

Page 197

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG56 2 2 2 3 3 3 3 2 3 2 4 2 1 37.5
Kirkhillhead Path - Lhanbryde              
ELGIN               
This route has hills that will limit access. It has two steep hills that are barriers.
One has old steps that need replaced, the other requires steps. Parts of this path
have encroaching vegetation and muddy sections. Additional waymarkers and
fingerposts required to navigate the route. Existing waymarkers and fingerposts
mostly need replaced. Some trees need dead branches cut back near Woodview
Crescent section. Drainage required to manage water on the paths, the track on
Walkers Crescent is badly worn with potholes. A map board near the Crooked
Woods would help. 
2 2  2  3  3  3  3  2  3  2  4  2  1  37.5               
Page 197

Page 198

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG57 3 4 2 3 4 1 3 3 3 2 3 2 1 38.5
Lhanbryde Safe Route              
ELGIN              
This route mostly runs on public pavements so access is high. Waymarking is
required on this route, especially around the housing areas where multiple paths
exist. There are several raised kerbs as barriers at road crossings and the joining
of this route to CP-EG58 may require a short path through the grass near
Woodview Crescent. The short earth path near Woodview Crescent is muddy
and overgrown. Adding street lights to two earth and grass paths in this area
would improve access. There is a metal barrier fence with a narrow turning circle
at Garmouth Road. 
3 4  2  3  4  1  3  3  3  2  3  2  1  38.5               
Page 198

Page 199

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG58 3 2 4 3 3 2 3 3 3 2 5 3 4 48.5
Playing Field Path - Lhanbryde              
ELGIN              
The section at the Cooked Woods end (one third of total route) is badly
overgrown and is a barrier to access. The remaining route has a lot of muddy
sections and encroaching vegetation. Fingerposts and waymarkers required for
the route.  3  2  4  3  3  2  3  3  3  2  5  3  4  48.5               
Page 199

Page 200

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG59 1 3 1 3 4 1 3 4 3 1 2 1 1 31
Maggot Cycle Path - Elgin              
ELGIN              
Waymarkers required on this path. There are two dead trees near to the path
requiring further assessment. Access to the route at Doocot lane is restricted
due to the narrow positioning of two bollards. 
1 3  1  3  4  1  3  4  3  1  2  1  1  31               
Page 200

Page 201

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-EG60 1 3 1 3 3 2 3 4 3 2 1 1 1 30
Southfield Path - Elgin              
ELGIN              
This route runs on wide, tarmac paths with street lighting. Waymarkers and a
fingerpost are required to navigate this route, currently there are no
waymarkers. There are some dead trees requiring further assessment in the
Southern section and an additional waste bin around the building would reduce
litter here. 
1 3  1  3  3  2  3  4  3  2  1  1  1  30               
Page 201

Page 202

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FB01 0 2 1 3 4 2 3 3 2 1 1 0 1 24.5
Cadgers Road - Garmouth              
GARMOUTH              
This route runs on public roads.  There are a couple of sections where large
puddles form on the road that require drainage. Some additional waymarker
required around new houses and pruning around the fingerpost at one end of
the path.  0  2  1  3  4  2  3  3  2  1  1  0  1  24.5               
Page 202

Page 203

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FB02 0 3 1 3 4 3 2 2 3 3 1 0 1 27.5
NCN Route 1 - Innes Road              
GARMOUTH              
This route runs on public roads.  A fingerpost is required for CP-FB04  0  3  1  3  4  3  2  2  3  3  1  0  1  27.5               
Page 203

Page 204

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FB03 3 3 3 3 3 2 3 2 3 2 4 4 5 48.5
Browlands Path - Garmouth              
GARMOUTH              
This path is overgrown, muddy and requires drainage. There is a section of path
next to the field has no fence with the crop planted right up to path this year,
farm machinery will operate very close to path. Old steps on this path need
replaced and regular maintenance of vegetation. 
3 3  3  3  3  2  3  2  3  2  4  4  5  48.5               
Page 204

Page 205

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FB04 3 3 3 3 3 1 3 2 3 2 4 3 5 46
Innes Lane Path - Garmouth              
GARMOUTH              
Most of this route runs on a narrow, overgrown, muddy earth path that is a
barrier. This section requires drainage, resurfacing and regular maintenance to
keep the vegetation back.
This route has a short section on vehicle aggregate tracks that are full of pot
holes in places. 
This route requires finger posts at each end. The section that joins CP-FB02 has
the fingerpost required for CP-FB04 listed on CP-FB02 route. 
3 3  3  3  3  1  3  2  3  2  4  3  5  46               
Page 205

Page 206

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FB05 0 3 2 2 4 2 2 2 2 2 3 1 1 30
Station Road Route - Garmouth              
GARMOUTH              
This route runs on public roads and pavements. Waymarkers are required to
follow the path. Using the public road as a cyclist is good, however following the
pavement sections as a pedestrian has some issues around the junction from
South Road onto Station Road - pavement section has encroaching vegetation
and a raised kerb - the junction is too dangerous to walk across as the route
currently goes.  A raised kerb further down Station Road is also a barrier.
Waymarkers required. 
0 3  2  2  4  2  2  2  2  2  3  1  1  30               
Page 206

Page 207

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FB06 2 3 3 3 3 4 4 4 3 4 2 2 1 41.5
NCN Route 1 - Spey Viaduct West              
GARMOUTH              
This short path runs on tarmac paths and has a car park at one end. Some tree
work required on damaged trees and vegetation including trees to be monitored -
grass is starting to creep in at edges narrowing path. 
2 3  3  3  3  4  4  4  3  4  2  2  1  41.5               
Page 207

Page 208

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FB07 2 3 3 3 3 4 4 4 3 4 3 2 1 43.5
NCN Route 1 - Spey Viaduct East              
GARMOUTH              
This route needs vegetation cut back at several areas. Vehicles parking on the
path and around the road crossing area is a problem. 
2 3  3  3  3  4  4  4  3  4  3  2  1  43.5               
Page 208

Page 209

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FB08 1 4 1 3 3 3 4 4 3 4 2 1 1 37
Mosstodloch to Fochabers Cycle Route              
FOCHABERS              
This route runs on tarmac and public pavements. Some sections have
encroaching vegetation that is obscuring lamp posts and reducing the path
width. There are a few dead trees around the Fochabers roundabout that need
further assessment. A number of Give Way signage is required at road crossings
and existing waymarkers/warning need re-orientated to the correct direction. 
1 4  1  3  3  3  4  4  3  4  2  1  1  37               
Page 209

Page 210

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FB09 3 3 3 3 3 3 3 2 3 2 3 3 1 40
Gordon Baxter Way - Mosstodloch              
FOCHABERS              
Two thirds of this path is muddy and has encroaching vegetation, some sections
are barriers to access.  The northern section on aggregate track is good.
Additional waymarkers required to navigate around other routes and existing
fingerposts and waymarkers are not in good condition. The woodland areas at
the Southern end of the route and near to Baxters have several dead trees in
need of further assessment. 
3 3  3  3  3  3  3  2  3  2  3  3  1  40               
Page 210

Page 211

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FB10 3 2 3 3 3 3 3 3 2 2 4 3 2 42.5
Essil Road and The Glebe - Mosstodloch              
FOCHABERS              
This route mostly runs on public roads and aggregate tracks. About a third of the
route runs on muddy aggregate tracks that get very muddy during wet weather. 
3 2  3  3  3  3  3  3  2  2  4  3  2  42.5               
Page 211

Page 212

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FB11 3 3 3 3 3 3 3 2 3 2 4 3 4 46.5
Stynie Wood Path - Mosstodloch              
FOCHABERS               
This route has a lot of issues.
About 1 quarter of this route, the northern section is a barrier to access with
overgrown paths and many windblown trees down across the path, the path has
almost disappeared.
The middle forest section has several dead and damaged/windblown trees that
need cleared.  There are also a few muddy sections in this area.
The southern section has a lot of muddy sections and encroaching vegetation.
Additional waymarkers required on whole route to navigate the paths. Safety
signage warning about the road at the north section is missing and bench and
boardwalk in this area need replaced.
Despite these issues, the southern and middle section is used regularly by
walkers, cyclists and horses. 
3 3  3  3  3  3  3  2  3  2  4  3  4  46.5               
Page 212

Page 213

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FB12 4 3 4 3 3 2 3 2 3 1 4 4 4 48
Stynie Path - Mosstodloch              
FOCHABERS              
Most of this route is muddy and has encroaching vegetation. Despite this it is
well used but less so during wet weather. Fingerpost required at one end and a
narrow gate is a barrier at the other. 
4 3  4  3  3  2  3  2  3  1  4  4  4  48               
Page 213

Page 214

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FB13 4 3 3 4 3 3 4 4 4 1 4 3 1 47
Webster Way - Mosstodloch              
FOCHABERS              
A reasonably level forest path.  Highly accessible by road and pavements.  Car
park needs maintenance to improve access. Forest path is starting to low points
where puddles form, could do with maintenance. Whole site needs maintenance
to control vegetation.  Suitable for cyclists.  A popular path with walkers. 
4 3  3  4  3  3  4  4  4  1  4  3  1  47               
Page 214

Page 215

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FB14 1 2 2 2 4 2 2 3 2 1 1 1 1 26
Home Farm Track - Fochabers              
FOCHABERS              
This route has one fingerpost and requires more waymarkers to navigate the
various routes. The route runs on tarmac roads, pavements and aggregates, all
of which are in acceptable condition. 
1 2  2  2  4  2  2  3  2  1  1  1  1  26               
Page 215

Page 216

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FB15 3 2 3 2 3 3 2 3 2 3 3 2 1 36.5
Den Track - Fochabers              
FOCHABERS               
Two thirds of this track is on good vehicle aggregate. The remaining third at the
northern end has a lot of muddy sections, some bad enough to be barriers.
Forestry harvesting is mainly causing this and vehicles from housing. The
northern section also has encroaching vegetation with two fallen trees blocking
access on the track. There are no waymarkers on the route, adding these would
improve access as the forest section and farm area has many side tracks. 
3 2  3  2  3  3  2  3  2  3  3  2  1  36.5               
Page 216

Page 217

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FB16 3 3 3 4 3 3 4 2 4 3 4 3 4 50.5
The Planting Path - Fochabers FB16              
FOCHABERS               
This path needs a tidy up and some drainage and resurfacing.
This path has muddy sections on the woodland section and a number of dead
trees requiring attention. The path around the tunnel is becoming overgrown
and narrowed by vegetation. Waymarkers and fingerposts need attention, 2
fingerposts are wobbly and most waymarkers and fingerposts need vegetation
cut back.
The tunnel lights do not work and a redundant gate in the woodlands could be
removed.  A locked gate at the Winding Walks end is a barrier.
This route is also missing waymarkers, especially around the housing area. 
3 3  3  4  3  3  4  2  4  3  4  3  4  50.5               
Page 217

Page 218

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FB17 3 3 3 3 3 3 3 2 3 2 4 3 4 46.5
Slorachs Loop - Fochabers              
FOCHABERS               
The northern part of this route has good access and is in good condition. The
section of path that travels uphill looking down on the caravan requires
fencing/possible moving back as there are some very steep drops next to the
path. There are also a lot of damaged trees along this Eastern part of the route
and encroaching vegetation. Encroaching vegetation and muddy sections need
attention on the Southern section in the forest area. A new vehicle gate has left
a narrow gap to pass in the South forest area. There are a few waymarkers
required to be replaced and some additional ones to navigate the route. The
section through the mountain bike trails is good, however a warning sign before
entering the trails is advised. 
3 3  3  3  3  3  3  2  3  2  4  3  4  46.5               
Page 218

Page 219

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FB18 0 3 1 2 4 3 3 4 2 3 1 0 1 28.5
Fochabers High Street              
FOCHABERS              
This route runs on public pavements. One road crossing missing tactile paving
and fingerposts/waymarkers required when crossing the High Street. Some
vegetation from gardens to be pruned back. 
0 3  1  2  4  3  3  4  2  3  1  0  1  28.5               
Page 219

Page 220

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FB19 1 4 1 4 4 1 3 4 4 1 2 0 1 32.5
Milnes School Safe Route - Fochabers              
FOCHABERS              
This route runs on tarmac paths and pavements with good access. There is a
muddy section on the wide tarmac path up to the school. This wide tarmac path
could have street lighting installed to improve access. There are two dropped
kerbs missing tactile paving and waymarkers are required. 
1 4  1  4  4  1  3  4  4  1  2  0  1  32.5               
Page 220

Page 221

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FB20 0 3 1 2 4 2 3 3 2 1 1 0 1 24.5
George Street Route - Fochabers              
FOCHABERS              
This short path runs on public pavements and roads. It has street lighting on the
whole route. There are raised kerbs as barriers and a broken waymarker post at
one end (this was logged on CPN-SW02).  Waymarker is required at the other
end of the route. A derelict building in the middle of the route needs further
inspection to assess its safety as does an old wall. 
0 3  1  2  4  2  3  3  2  1  1  0  1  24.5               
Page 221

Page 222

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FB21 4 3 3 3 3 3 3 2 3 2 5 4 4 51
The Intak Paths - Fochabers              
FOCHABERS               
The northern section on public roads is good and requires additional waymarking
and pruning. The southern section on the aggregate tracks and paths has a lot of
muddy and overgrown sections.
Part of the path in the southern section runs too close to the river and needs re-
routed. The Intak interpretation board area is overgrown and hidden unless you
know it's there.  The area near the southern steps has some windblown trees
that need attention, Crown Estate Scotland notified. The route has many
damaged trees that require further assessment. The steps at the southern end
need replaced. 
4 3  3  3  3  3  3  2  3  2  5  4  4  51               
Page 222

Page 223

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FB24 3 3 3 3 3 3 2 3 3 1 2 3 1 37
Bogmoor Link - Dallachy              
FOCHABERS              
Waymarkers required for this route. This route has some muddy sections on the
vehicle track and requires some barriers on the bridge. 
3 3  3  3  3  3  2  3  3  1  2  3  1  37               
Page 223

Page 224

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR01 0 2 2 2 3 3 2 4 2 3 1 1 1 28
Cloddymoss Culbin Track - Dyke              
FORRES               
This route runs on aggregate vehicle tracks. There are several muddy sections
being churned up by forestry trucks. The route could do with better waymarking,
current waymarkers have only numbers on posts without arrows making
navigating a challenge. There are some additional waymarkers required to
navigate the paths, and some fingerposts would improve access. The car park
area is quite hidden and could do with better signage on approach. 
0 2  2  2  3  3  2  4  2  3  1  1  1  28               
Page 224

Page 225

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR02 0 1 2 2 3 2 2 4 2 2 1 1 1 25
Hidden History to Cloddymoss Track -Dyke              
FORRES               
This route runs on aggregate paths. There are several muddy sections at low
points and some encroaching vegetation, both issues will need addressing before
they start affecting access. The route could do with better waymarking, current
waymarkers have only numbers on posts without arrows making navigating a
challenge.  Additional fingerposts and waymarkers would improve access. 
0 1  2  2  3  2  2  4  2  2  1  1  1  25               
Page 225

Page 226

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR03 1 1 1 3 3 4 4 4 3 2 2 1 1 33
Hill 99 Trail - Culbin              
FORRES               
This route runs on aggregate tracks. The route could do with better waymarking,
current waymarkers have only numbers on posts and a colour band, without
arrows on junction waymarkers navigating can be a challenge at times.  There is
a lot of furniture and waymarkers on this route, a few waymarkers need
maintenance. An additional mapboard around the route would help with
navigating. There is a section leading to the car park where the route has been
divided into an aggregate path and vehicle track, separated by a few small
stones. These stones do not run the entire length of the path, the stones are
small and carry the risk of being tripped on or hit by a bicycle. 
1 1  1  3  3  4  4  4  3  2  2  1  1  33               
Page 226

Page 227

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR04 3 3 3 2 3 2 2 2 2 2 5 3 5 46
Loanie Road - Dyke              
FORRES               
This route is mostly muddy and overgrown.  The route appears to be well used
by horse riders and this is churning up the unsurfaced path. The West woodland
section gets very muddy and is a barrier to access in places, it also has
encroaching gorse and broom. The path between the fields is muddy but still
passable, grass here will need strimmed or will it make the path overgrown in
summer.  The path goes under a large electric pylon, there is a risk of horse
riders hitting their head on the exposed metal beams, hi vis strips or a warning
sign required. Nearby there are anchor cables with barbed wire on them for a
utility pole over the path that pose the same risk to horse riders and requires
protective covers. 
3 3  3  2  3  2  2  2  2  2  5  3  5  46               
Page 227

Page 228

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR05 3 2 3 2 3 3 2 3 2 3 5 3 5 48
High Wood Track - Dyke              
FORRES              
Most of this route has narrow, muddy paths that are overgrown with gorse. A
fallen tree is also a barrier to access. Some waymarkers cannot be seen for gorse
and may need to be moved.  3  2  3  2  3  3  2  3  2  3  5  3  5  48               
Page 228

Page 229

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR06 2 2 3 2 3 3 2 2 2 3 4 3 4 42.5
Kintessack to Broom of Moy Right of Way              
FORRES               
Half this route runs on public tarmac road. The other half from Moy House to
Kintessack is muddy, overgrown and has two sections with Japanese knotweed
and Giant Hogweed next to the path that need treatment. The muddy sections
here will need resurfacing and draining to improve the path. The metal
footbridge on the West end of the path is in good condition but will need
painting/corrosion treated to avoid it deteriorating. Fencing at this bridge needs
replaced and steps either side of the bridge could be ramped up. Some
additional waymarkers required in the route. 
2 2  3  2  3  3  2  2  2  3  4  3  4  42.5               
Page 229

Page 230

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR07 3 3 3 2 3 4 3 4 2 4 4 3 4 49.5
NCN Route 1 - Broom of Moy to Forres              
FORRES               
The Western section of this route at the Broom of Moy end has encroaching
vegetation and several muddy sections. Waymarkers on this Western route
need replaced and need vegetation pruned back, additional waymarkers also
required. The area at Waterford Road where the path goes into the woodland
often has cars parked here blocking access to the gate here and obscuring
visibility around the road. There is an opportunity to create a 25m section of
path at this Waterford Road/woodland area, this would join the woodland path
to the cycle path. The cycle path on Waterford Road is good but is missing Give
Way signage at road crossings. Fingerposts on this route are one sided and
would be better if they were 2 sided. The section from the junction at
Benromach Way going Eastwards has some encroaching vegetation on the
pavement section. 
3 3  3  2  3  4  3  4  2  4  4  3  4  49.5               
Page 230

Page 231

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR08 3 3 3 3 3 3 3 3 3 3 3 3 4 46.5
Greshop Path - Forres              
FORRES               
Two thirds of this route runs on tarmac and aggregate tracks with good access.
Overall the Eastern part of the route is good, there are some muddy patches on
the aggregate where the path dips and water collects. The aggregate section in
the West has encroaching vegetation and is overgrown in places. There are
muddy sections and waymarkers that are obscured by vegetation. Some
additional waymarkers are required across the route to navigate side paths. 
3 3  3  3  3  3  3  3  3  3  3  3  4  46.5               
Page 231

Page 232

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR09 4 3 3 2 3 3 3 2 2 2 5 4 5 50.5
Findhorn River Path - Forres              
FORRES               
This route has a lot of encroaching vegetation and muddy sections.  Gorse,
broom and grass are overgrown in places and narrow the path. Some recent
cutting back has helped but there is still a lot encroaching. There is one
fingerpost at the A96 but the route requires several waymarkers and another
fingerpost to navigate the side paths. The route at the A96 vehicle aggregate
section needs defined as there are two routes down to the river, both are steep
and barriers to access.  There is a good aggregate path in the middle of this
route, it just needs vegetation cleared. There is steep bank at the Broom of Moy
area and near the A96 road area that may require a barrier. 
4 3  3  2  3  3  3  2  2  2  5  4  5  50.5               
Page 232

Page 233

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR10 3 2 3 2 3 3 3 2 2 2 4 3 1 39
Greshop to Mundole Path - Forres              
FORRES               
This route has a lot of encroaching vegetation. The southern section from the
start to the A96 bridge needs vegetation cut back and some muddy sections
addressed.  Two fingerposts need replaced and some additional waymarker
posts to navigate the various paths. There are two short steep sections in this
area that also require steps or a handrail. The A96 bridge has a low beam at one
side requiring a warning sign. Going north from the A96 bridge there is a large
fallen tree across the path that needs cleared and encroaching grass/weeds that
may require an annual strim to keep under control. Past the retail unit the path
narrows and becomes close to a steep bank that requires a barrier.  There is
giant hogweed stems in this area that may need to be treated if still active and
warning signs. The junction area onto the pavement section and where CPN-
FR11 path meets needs better defined. At the moment it is easy to miss as it has
uneven ground and encroaching grass, adding a 5m aggregate path here and
levelling the ground would improve access. The
narrow pavement section to the wide pavement has some encroaching gorse
requiring to be cut back. 
3 2  3  2  3  3  3  2  2  2  4  3  1  39               
Page 233

Page 234

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR11 1 2 1 2 4 2 2 2 2 2 1 1 1 25
A96 Pavement - Forres              
FORRES               
This route runs on public road pavements.   Waymarkers are required at each
end where other paths join, these can be added to new and existing fingerposts.
There are two dropped kerbs missing tactile paving with encroaching
grass/earth. The pavement access is good however the width of the pavement
could be wider if earth at the inside edge is scraped back a little, at times the
path feels a bit close to the busy road. Some encroaching branches need pruned
back and a short section of fencing to a steep bank required. The crossing of the
entrance/exit of the retail unit could be defined better as it feels like you are
very exposed walking on the road edge. 
1 2  1  2  4  2  2  2  2  2  1  1  1  25               
Page 234

Page 235

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR12 1 3 1 2 4 2 2 3 2 2 3 2 1 32.5
Greshop Route - Forres              
FORRES               
This route runs on public road pavements with street lighting. There are a
number of raised kerbs as barriers to access and some missing tactile paving at
dropped kerbs. On West Road vehicles parking encroach over the pavement at
the vets building and a section of road and pavement near here floods when wet,
both areas in West Road are barriers to access. There are no waymarkers,
waymarker are required and can be fitted to lamp posts. There are some
branches requiring to be cut back on Greshop Road and also there is moss
encroaching on the pavements in this area. 
1 3  1  2  4  2  2  3  2  2  3  2  1  32.5               
Page 235

Page 236

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR13 0 4 1 2 4 3 2 4 2 3 1 0 1 28.5
NCN Route 1 - Forres to Kinloss              
FORRES              
This route runs on public roads. The road crossing at Findhorn roads needs Give
Way signage and an additional waymarker is required mid-route at a junction
where a small blue plastic waymarker is present. There is one short area in the
West where the road surface is poor with puddles. 
0 4  1  2  4  3  2  4  2  3  1  0  1  28.5               
Page 236

Page 237

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR14 3 3 3 3 3 2 4 3 3 2 3 3 4 45.5
The Walkies - Forres              
FORRES              
This route is waymarked in one direction at times making it difficult to follow if
not going in the waymarked direction. Additional waymarkers required. This
route has encroaching vegetation to prune back and may require a strim in the
summer. The metal gates at the A96 crossing need adjustment to open easier,
both metal and kissing gates could be replaced by two self-closing pedestrian
gates either side of the A96. There are some muddy sections along the route
that need addressing.
On the north side of the A96 next to the railway line there are dead trees in need
of further assessment. 
3 3  3  3  3  2  4  3  3  2  3  3  4  45.5               
Page 237

Page 238

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR15 0 4 1 3 4 4 4 4 3 4 1 0 1 34.5
Forres to Findhorn Cycle Route (South)              
FORRES               
This route runs on tarmac surfaces.  Some encroaching vegetation needs cut
back at Findhorn junction area and along most of the route vegetation will need
regular maintenance to keep back grass and gorse. Some additional waymarkers
required, especially as you enter Forres and make your way towards Grant Park,
the section of route that runs parallel to Victoria Road alongside the Police
Station requires waymarkers. Some missing Give Way signage at road crossings
and cyclists dismount signage. Once in Forres as a cyclist the Forres section has
no issues.  As a pedestrian there are dropped kerbs missing tactile paving. 
0 4  1  3  4  4  4  4  3  4  1  0  1  34.5               
Page 238

Page 239

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR16 3 3 4 3 4 3 3 4 3 3 2 3 1 43
Forres Enterprise Park CycleTrack              
FORRES               
This route runs on a public road pavement cycle path, half is in good condition,
half requires maintenance.  Encroaching grass at the edges is gradually
narrowing the path, so much so that the Forres West side of the path is narrower
than the East side at Forres Enterprise Park, this grass needs dug back before it
narrows further. There are patches of gorse requiring cut back and at Forres,
branches and earth need cleared from the path. Cutting grass around the Forres
area will be required in the summer. The road layby fills with water during wet
weather which in turn soaks the path when a vehicle pulls in. There are also a
couple areas of the path that flood during wet weather. Road crossings require
Give Way signage and the road crossing in the middle of the route next to 
houses has poor visibility of the junction due to a garden hedge.  Waymarkers
and a fingerpost required for this route. Several blue pedestrian and cyclist sign
posts are secure but have badly corroded metal posts. 
3 3  4  3  4  3  3  4  3  3  2  3  1  43               
Page 239

Page 240

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR17 3 3 4 3 3 3 3 2 3 2 4 3 5 49
Lochyhill to Leanchoil Path - Forres              
FORRES               
The section that runs parallel to Birkenhillock Road behind the houses is narrow,
overgrown, muddy and a barrier to access. There are muddy sections and
encroaching vegetation alongside the golf course that also need addressing.
The long path through the woodland to the B9010 road has a lot of encroaching
gorse and muddy sections, there are also some dead trees requiring further
assessment. The narrow earth path alongside the B9010 is a barrier and requires
widening and resurfacing, with large trees at the roadside this might involve
cutting a new path back from the road edge. The rest of path that runs alongside
the B9010 going West has some low areas that have large puddles when wet and
some encroaching vegetation. Additional waymarkers are required along the
whole path to navigate side paths and follow the route. 
3 3  4  3  3  3  3  2  3  2  4  3  5  49               
Page 240

Page 241

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR18 3 4 3 3 3 3 3 3 3 2 3 3 4 46.5
Clovenside Path - Forres              
FORRES               
Half of this route runs on tarmac roads with good access. The other half runs on
mostly muddy aggregate paths. There has been some recent work on the
aggregate path section to widen and solve wet areas however this is only a short
section.  The muddy aggregate/earth section on the Eastern end of the route
also may require strimming in the summer to control grass and bracken. There
are two fingerposts on this route but both have one finger and require additional
fingers for the other direction. Additional waymarkers are required to navigate
the route as well as warning signs to vehicles at the road crossing areas. 
3 4  3  3  3  3  3  3  3  2  3  3  4  46.5               
Page 241

Page 242

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR19 3 2 3 2 3 3 3 3 2 2 3 2 4 41
Muiry Wood Paths - Forres              
FORRES               
This route runs on aggregate woodland paths. Waymarkers and fingerposts are
required to navigate route.  Some waymarkers exist but most need replaced.
There are a lot of muddy sections that need addressed, some sections have had
side-let ditches added and this has kept the path dry. Many existing side-let
ditches need cleared out.
Encroaching vegetation needs cut back in places and could do with being
strimmed back before it becomes a problem. There are several timber cross
drains requiring repairs/replacement. A mapboard at the Northern area would
be useful to navigate the many different routes. 
3 2  3  2  3  3  3  3  2  2  3  2  4  41               
Page 242

Page 243

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR20 3 3 3 2 3 3 3 3 2 3 3 3 1 40
Chapleton Track - Forres              
FORRES               
Two thirds of this path has good access on vehicle tracks and aggregate tracks,
the other third (East section) has encroaching vegetation, is muddy and difficult
to follow. The bridge on the West side vehicle track requires fencing as a barrier
to steep drops. The aggregate path in the middle of this route has some muddy
areas to be addressed and some encroaching patches of gorse. The East section
area has some broken waymarkers that need replaced and additional
waymarkers required to navigate the various paths. There is encroaching
vegetation - grass/bracken that may require seasonal cutting and muddy sections
that need addressed.  The timber footbridge in this area needs maintenance,
trees need cut back, grass/moss/mud needs cleared off the bridge and several
timber decks have rot with one partially broken. 
3 3  3  2  3  3  3  3  2  3  3  3  1  40               
Page 243

Page 244

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR21 2 2 3 2 3 3 2 3 2 2 2 1 1 31
Woodside Path - Forres              
FORRES              
Overall a good woodland walk that requires some waymarking and annual
maintenance.
This route runs on woodland aggregate paths. Additional waymarkers are
required, current waymarkers are one sided and other neighbouring routes can
be confusing. There are some muddy areas to address on the route and seasonal
cutting of vegetation required, bracken may narrow some sections of paths. 
2 2  3  2  3  3  2  3  2  2  2  1  1  31               
Page 244

Page 245

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR22 3 4 3 2 3 1 3 2 2 2 4 3 4 43.5
Mannachie Paths - Forres              
FORRES               
About half of this route at Mannachie Rise is shared with the Dava Way route CP-
DA01. The Mannchie Rise area has a raised kerb as a barrier and dropped kerbs
without tactile paving. Waymarkers on this section are for the Dava Way and
there is some encroaching vegetation from neighbouring gardens. The woodland
section starting at Loch View needs waymarkers to navigate the route. This
woodland section to the vehicle track is badly overgrown and muddy in places.
The vehicle track to Mannachie Road is mostly muddy and also waymarkers
required on this section. 
3 4  3  2  3  1  3  2  2  2  4  3  4  43.5               
Page 245

Page 246

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR23 2 4 2 3 3 2 3 4 4 1 2 1 1 35
Thornhill Park Paths - Forres              
FORRES               
These routes runs on tarmac paths with street lighting. There are two raised
kerbs at Mannachie Road as barriers and dropped kerbs on the route are missing
tactile paving. Give Way signage is required at cycle path junctions, it is not clear
what paths on this route are for cycling. There is encroaching grass at the edges
of the tarmac paths that is narrowing the path slightly. Bollards may be required
to prevent unauthorised vehicles accessing the paths, there has been vehicles on
the grass but this may be for maintenance. There are no waymarkers present,
waymarkers/fingerposts are required to navigate the route. 
2 4  2  3  3  2  3  4  4  1  2  1  1  35               
Page 246

Page 247

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR24 0 3 2 2 4 2 2 3 2 2 2 0 1 27.5
Rafford Road Route - Rafford              
FORRES              
A bit of drainage/surfacing in the forest section and fingerpost at end of route.
Current fingerposts could do with maintenance. Short route mostly on public
road.  0  3  2  2  4  2  2  3  2  2  2  0  1  27.5               
Page 247

Page 248

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR25 0 4 1 3 3 4 4 4 3 4 2 0 1 35.5
Forres to Findhorn Cycle Route (North)              
Findhorn               
This route runs mostly on tarmac surfaces. There are some raised kerbs as
barriers on the one way street section. On the one way street at the west end of
this route, it is not clear if bikes can cycle against vehicles on this road or use
the pavement, additional signage required. Some encroaching vegetation on the
cycle path section, this may require a strim in the summer to maintain grass,
some gorse to also cut back. The main road drains into the cycle path at many
points, this will make these cycle path sections prone to being wet. Some
additional safety signage required a road crossings including Give Way and
cyclists dismount. 
0 4  1  3  3  4  4  4  3  4  2  0  1  35.5               
Page 248

Page 249

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR26 1 3 2 3 3 3 3 4 2 2 1 1 1 31
Beach Road - Findhorn              
Findhorn              
This route mostly runs on tarmac and aggregate public roads. The northern
section of aggregate is quite badly potholed and will need resurfacing. There has
been recent resurfacing of the aggregate track in the middle section of the route.
The southern section has an overgrown dropped kerb and a raised kerb as a
barrier on the aggregate pavement area. An encroaching hedge narrows the
tarmac pavement area.
A fingerpost in the north section needs the lichen removed before it obscures
the text further. 
1 3  2  3  3  3  3  4  2  2  1  1  1  31               
Page 249

Page 250

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR27 1 3 2 3 2 3 4 3 3 2 3 1 1 35
Foundation Path - Findhorn              
Findhorn              
This route has no waymarkers and is difficult to find, especially from the
Findhorn Road side. There is a broken fingerpost in the dune area, however
waymarkers are required to navigate the woodlands. There are many narrow
sections of path, some have muddy sections and encroaching vegetation. There
are a couple of trees to cut back from the woodland area. 
1 3  2  3  2  3  4  3  3  2  3  1  1  35               
Page 250

Page 251

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR28 1 3 1 3 4 1 3 3 3 3 2 1 1 32
Ramflat Road Path - Forres              
FORRES              
This route runs on public road tarmac pavements and roads. The road crossings
at Pilmuir Road and West Road have raised kerbs and missing tactile paving at
dropped kerbs. The exact crossing points at these roads are not well defined.
Waymarkers are required to navigate this route. 
1 3  1  3  4  1  3  3  3  3  2  1  1  32               
Page 251

Page 252

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR29 1 4 1 4 3 1 4 4 4 3 2 1 1 36
Thornhill Residential Path - Forres              
FORRES               
This route runs on tarmac surfaces.  The road crossing at Grantown Road
requires cyclist dismount signage. The tarmac path between Grantown Road and
Grant Drive has encroaching vegetation from garden shrubs and moss. The ramp
near Nursery Lane has a short section of fence requiring repairs and street
lighting at the ramp area would improve access. There is a tall dead tree at the
ramp area requiring further assessment. Waymarkers are required to navigate
the route, most of these can be located on waymarkers. 
1 4  1  4  3  1  4  4  4  3  2  1  1  36               
Page 252

Page 253

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR30 2 4 2 3 3 3 4 3 3 3 2 2 1 38.5
Tytler Street Path - Forres              
FORRES               
This route runs on public road pavements.    Waymarkers are required to
navigate the streets, these can be fitted to lamp posts. There are some dropped
kerbs missing tactile paving and a dropped kerb on the A96 road section that has
a large puddle during wet weather. There is encroaching vegetation between
Tytler Street and the A96 that requires cutting back. The A96 section has some
encroaching vegetation that will need regular maintenance and broom needing
cut. Some broom needs cut back on the path to the railway station as well. The
A96 road crossing may require cyclists dismount signage or better Give Way
signage.  Signage painted on the tarmac path is faded on the A96 section. 
2 4  2  3  3  3  4  3  3  3  2  2  1  38.5               
Page 253

Page 254

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR31 1 4 1 3 3 2 3 3 3 2 2 1 1 32
Mosset Burn Corridor Path - Forres              
FORRES               
From the North the path from the A96 to Gordon Street is muddy and has no
street lighting. The footbridge at Invererne Road has a step that limits access.
There is muddy grass/earth near Plasmon Lane leading up to the school. Along
the route there are raised kerbs as barriers and dropped kerbs without tactile
paving. Waymarkers are required on this route to navigate the streets, some
existing waymarkers for other routes can cause confusion. 
1 4  1  3  3  2  3  3  3  2  2  1  1  32               
Page 254

Page 255

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR32 3 4 3 3 3 1 4 3 3 1 3 3 4 44.5
Forres Academy Safe Routes              
FORRES               
The Northern half this route runs on tarmac and has good access, although
waymarkers are required. The Southern half has a lot of muddy sections,
encroaching vegetation and requires waymarkers to navigate. The section from
Sanquhar Road to the school is very muddy with encroaching vegetation as a
barrier. There are also damaged trees on this section requiring attention. The
Southern section leading to the playing fields is very muddy and a barrier to
access.  The bridge next to the school car park has steps as barriers and the
bridge itself is in poor condition and needs further assessment as it has corrosion
and encroaching vegetation. There is a dead tree requiring attention above the
steps south of the bridge at the school. The aggregate track to  Macdonald Drive
is very pot holed and muddy when wet. 
3 4  3  3  3  1  4  3  3  1  3  3  4  44.5               
Page 255

Page 256

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR33 0 4 1 4 4 1 4 4 4 2 1 0 1 31.5
Roysvale Path - Forres              
FORRES              
This route runs on tarmac surfaces. There are no waymarkers on this route,
several required to navigate the streets. There are a number of dropped kerbs
requiring tactile paving and some encroaching vegetation to maintain. 
0 4  1  4  4  1  4  4  4  2  1  0  1  31.5               
Page 256

Page 257

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR34 2 3 2 3 3 1 3 1 2 1 4 2 1 33.5
Breakback Path - Forres              
FORRES               
Access on this route will always be limited due to the steep terrain, however half
this route has good access, the other half needs attention. However the path at
Nelson Road to St. Leonards Court is badly overgrown with a neighbouring hedge
that blocks access. There are also some steep slope that require handrails,
possibly steps. There is encroaching vegetation along most of this path and
muddy sections. Additional waymarkers required to navigate the path, some
existing waymarkers on lamp posts are only for one direction making following
the route confusing. The section on Nelson Road has some raised kerbs and
missing tactile paving. 
2 3  2  3  3  1  3  1  2  1  4  2  1  33.5               
Page 257

Page 258

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR35 1 4 1 4 3 2 3 4 3 1 1 1 1 31
Sanquhar Loch Circular Path - Forres              
FORRES              
This route runs on mostly wide aggregate. There are some additional
waymarkers required to navigate around a few side paths. Along the waterside
section there are some steep exposed drops that could do with a barrier. The
footbridge has 2 steep ramps that need better anti-slip on the decks. The West
section going uphill has steep exposed banks and again a fence/barrier is
required, there is some encroaching grass on this section as well. There are a
few muddy sections but overall the route is good. Lifesaving rings are required
around the route. 
1 4  1  4  3  2  3  4  3  1  1  1  1  31               
Page 258

Page 259

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR36 3 3 2 3 3 1 3 1 2 1 3 2 1 32.5
St Leonard’s Path - Forres              
FORRES               
This is a short route with split between earth and aggregate tracks.
The West of this route has some muddy sections and encroaching vegetation.
Waymarkers are required in the Western section, current waymarking is
confusing due to multiple small waymarkers on one post. Resurfacing the
muddy section and cutting back vegetation would improve access. 
3 3  2  3  3  1  3  1  2  1  3  2  1  32.5               
Page 259

Page 260

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR37 3 3 3 2 3 3 3 3 2 2 3 3 1 39
Cluny Path - Forres              
FORRES               
The Southern half of this route runs on tarmac and has good access, the
northern half runs on aggregate/earth and has a lot of muddy sections.
The muddy sections on this route may just be earth and leaf material holding
water on top of aggregate, scraping this material back may get rid of the mud.
Recent vehicle access on the vehicle track in the middle of the route has left the
track very muddy. There are some encroaching branches to be pruned back and
a fallen tree across the path. Fingerposts are present on the path, one is hidden
by a small tree and additional waymarkers could be fitted to these fingerposts
for other   Additional waymarker posts are required to navigate the side paths. 
3 3  3  2  3  3  3  3  2  2  3  3  1  39               
Page 260

Page 261

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR38 1 4 1 3 3 2 3 3 3 3 3 1 1 35
Grant Park Path - Forres              
FORRES               
This route runs on wide and narrow aggregate paths. There are a few muddy
sections on the route. 3 fingerposts required where other paths meet and an
additional waymarker to navigate the paths. This route has no street lighting,
adding lighting would improve access during dark hours/winter season. An old
broken lamp post base near Saint Leonards Road end requires covered/removed,
there looks to have been lighting on this route in the past. 
1 4  1  3  3  2  3  3  3  3  3  1  1  35               
Page 261

Page 262

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR39 2 2 2 2 3 3 3 1 2 2 3 2 1 32.5
Bronte Path - Forres              
FORRES               
The hilly terrain will always limit access on this route. Additional waymarkers are
required around the car park area of the route.  The steps near to the car park
end require anti-slip on the timber edges and leaves and branches cleared. One
set of steps has a wobbly handrail fence. The muddy sections on this route is
mostly leaf material and earth sitting on aggregate, scraping this leaf material
back and topping up aggregate will improve these sections.  There are a couple
of sections up the hill at the Eastern side that are very muddy and need
addressing. At the hill section towards the East there are some dead trees
requiring further assessment. 
2 2  2  2  3  3  3  1  2  2  3  2  1  32.5               
Page 262

Page 263

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR40 1 2 1 2 3 3 3 2 2 2 2 1 1 28
Grant Park Central Path - Forres              
FORRES              
This route has some steep hills that will limit access. Half of the route runs on
tarmac, the other half runs on wide aggregate. There is a section of aggregate
that is muddy when wet to the west of the route. A large cross drain near the
playing fields needs clearing out and waymarkers are required to navigate the
route.  There is no street lighting on this route. 
1 2  1  2  3  3  3  2  2  2  2  1  1  28               
Page 263

Page 264

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR41 1 2 1 2 3 2 2 1 2 2 3 1 1 27
Lodge Path - Forres              
FORRES               
This route has no waymarkers, several required plus one fingerpost to navigate
the route where other paths meet. The path on the west side going up to the
tarmac road needs defining and resurfacing as it splits into two at the tarmac
road, both areas are not mobility scooter or wheelchair friendly.  The hill from
the tarmac road to the lodge house is a barrier as it is steep and requires
steps/handrail and vegetation to be cleared. There are some steep exposed
banks requiring fencing/barrier on the woodland path and several muddy
sections need addressing. These muddy areas may just need a scrape to remove
leaves and earth material. Odd branches need pruned back on the woodland
path. 
1 2  1  2  3  2  2  1  2  2  3  1  1  27               
Page 264

Page 265

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR42 1 3 2 2 4 3 3 3 2 3 3 2 1 36.5
Forres Town Centre Link              
FORRES               
This route runs on tarmac surfaces with street lighting and is a well-used route.
The Western section at Caroline Street has the most issues with overgrown
pavement sections and a raised kerb that limits access and encroaching moss.
There is also a section of fallen heras fencing here encroaching the road and a
derelict building requiring fencing/signage. There are missing tactile paving at
several dropped kerbs along the route and a dropped kerb blocked by parked
cars at Caroline Street/North road. There is an old wall at Milnes Wynd with
poor stonework requiring further assessment and the tunnel at Milnes
Wynd/High Street is missing lighting. There are two low bollards between
Urquhart Street and the High Street that could have better visibility.
Waymarkers are required along the route to navigate streets. 
1 3  2  2  4  3  3  3  2  3  3  2  1  36.5               
Page 265

Page 266

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-FR43 2 3 3 2 3 2 2 2 2 2 4 3 5 43
Pressley Path - Logie              
FORRES              
This short path is a useful connection to the Dava Way that needs upgrading and
maintenance. Removing the squeeze chain gate and steps at the Dava Way end
and building a new path here would increase access. Adding waymarkers and
drainage would also be required. Vegetation also needs cut back. Path is well
hidden by vegetation and lack of signage. 
2 3  3  2  3  2  2  2  2  2  4  3  5  43               
Page 266

Page 267

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-IW01 1 3 1 3 3 4 3 3 3 4 3 2 1 38.5
The Isla Way - Tininver Dufftown              
Isla Way              
This path has steps, narrow corridors and muddy grassy tracks that limit access
to this route. The steep hill near the road will always limit access due to the
terrain. More waymarkers will help navigate the street section. As this is the
start/end of the Isla Way it feels like there should be a mapboard at the
start/end to celebrate this as it currently has nothing. 
1 3  1  3  3  4  3  3  3  4  3  2  1  38.5               
Page 267

Page 268

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-IW02 3 3 3 3 2 4 4 2 3 4 4 3 4 49.5
The Isla Way - Tom Na Muidh Dufftown              
Isla Way              
This route needs some updating to make the path more accessible. The path
through the forest section is uneven with old steps and missing waymarkers.
There is also a large number dead and damaged path side trees that need further
attention/assessment.  The closed section of the path also looks like it would
need a lot of trees removed to get opened. The path is used a lot and would
benefit from aggregate paths either side of the forest to avoid them becoming
muddy. 
3 3  3  3  2  4  4  2  3  4  4  3  4  49.5               
Page 268

Page 269

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-IW03 2 3 1 2 4 4 3 4 2 4 3 1 1 38
The Isla Way Balvenie Public Road Dufftown              
Isla Way              
This path mostly runs on public road pavements. The section on the bridge at
the A941 Station Road and onto Castle Street limits access as there is no
pavement on busy roads. The cycle route on the pavement section could also
benefit from signage to manage crossing junctions and roads. 
2 3  1  2  4  4  3  4  2  4  3  1  1  38               
Page 269

Page 270

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-IW04 2 2 3 2 3 4 3 3 2 4 3 3 4 44.5
The Isla Way - Dufftown Station Path              
Isla Way              
This short route cuts through the Dufftown Railway area and is a busy area.
Clearer waymarkers and updating the path between the car park and the station
would make this route more accessible. Raised kerbs, encroaching vegetation
and muddy paths make this short path feel neglected. 
2 2  3  2  3  4  3  3  2  4  3  3  4  44.5               
Page 270

Page 271

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-IW05 3 3 3 3 3 4 4 4 2 4 3 3 1 45
The Isla Way - Convalmore Link Dufftown              
Isla Way              
This section of path is popular and has the potential to be all ability with some
upgrades. The car park ramp area requires work to upgrade the disabled access
and resurfacing the path route would fix the muddy areas and level the terrain.
Path would require some drainage and tree work.
Bridges require some timber maintenance as does the map board and picnic
table area. 
3 3  3  3  3  4  4  4  2  4  3  3  1  45               
Page 271

Page 272

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-IW06 3 3 3 2 3 4 3 2 2 4 4 3 5 49
The Isla Way - Jubilee Path Dufftown              
Isla Way              
Half of this path down past the distillery is good.  The other half across the bridge
up to the public road requires upgrading. The footbridge is getting old and
requires maintenance/inspection. Drainage and surfacing would help the track
up to the public road.  3  3  3  2  3  4  3  2  2  4  4  3  5  49               
Page 272

Page 273

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-IW07 1 2 2 2 4 4 2 3 2 4 1 1 1 31
The Isla Way - Tulloch Road Dufftown              
Isla Way              
This route is on public roads. The hilly terrain will always limit access, however
there are no barriers on this quiet road. Replacing the fingerpost at the junction
and adding a couple of waymarkers will also improve this route. 
1 2  2  2  4  4  2  3  2  4  1  1  1  31               
Page 273

Page 274

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-IW08 2 2 3 2 3 4 2 2 2 4 3 2 2 38
The Isla Way Kininvie Wood Road Drummuir              
Isla Way              
This route will always have access limited by the steep terrain. Upgrading the
forest track would address the muddy areas. There are a number of dead path
side trees to be addressed/assessed. Access around the forest gate and cutting
back vegetation and replacing a fingerpost/adding waymarkers would improve
this path. 
2 2  3  2  3  4  2  2  2  4  3  2  2  38               
Page 274

Page 275

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-IW09 2 2 3 2 3 4 2 3 3 4 3 2 4 43
The Isla Way - Loch Park Link Drummuir              
Isla Way              
This route is mostly flat and accessible but is limited by grassed over aggregate
or unsurfaced vehicle tracks that are muddy when wet. Waymarkers need to be
repositioned so they can be seen and additional ones installed, especially around
the Loch Park area. Currently a waymarker directs people down an overgrown
nature walk off the core path. With some upgrading this route could be all
ability. 
2 2  3  2  3  4  2  3  3  4  3  2  4  43               
Page 275

Page 276

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-IW10 4 3 3 3 3 4 3 4 3 4 4 4 4 54
The Isla Way - Drummuir Link              
Isla Way               
Most of this path is graded as all ability however a lot of this route has
encroaching vegetation, narrowing the path. The low section of path that runs
alongside the River Isla is uneven in places and is being eroded when the river is
high and requires a raised path and drainage. Fences along this section of path
also need addressing as the railway line runs quite close. There is currently a
diversion as a new vehicle bridge is currently being constructed. Once complete
there should be appropriate fences to the steep river bank. The diversion goes
along a narrow path and footbridge. Path needs regular maintenance to
maintain all ability access. 
4 3  3  3  3  4  3  4  3  4  4  4  4  54               
Page 276

Page 277

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-IW11 2 1 3 2 3 4 2 3 2 4 4 2 4 43
The Isla Way - Cachenhead Path Drummuir              
Isla Way               
This route has a blocked culvert on it that is turning the vehicle track very
muddy. This route mostly runs on vehicle tracks that will get muddy when wet
and have vehicle ruts. Grass cutting needed on these tracks as well as tree
maintenance. Two broken waymarkers at one end need replaced as well as
fingerpost maintenance. As this is the start/end of the Isla Way a mapboard
would be a nice addition, nothing currently at the end of this route. The
roadside section has some short side paths running next to the public road that
have small waymarkers, this is on the section of road that has poor visibility,
however these short paths are muddy are narrow. 
2 1  3  2  3  4  2  3  2  4  4  2  4  43               
Page 277

Page 278

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-KT01 3 2 3 2 3 3 3 3 2 3 3 3 4 43.5
Fishwives Road - Newmill to Drybridge              
Isla Way               
Half of this route is on public roads with good access. There are some barriers in
the off road sections with muddy, overgrown tracks. The section that runs either
side of the cottage before the forestry track needs drainage and vegetation cut
back. The route leading down past the farm to Drybridge has some issues with
electric fences being close to the route and cattle. Drainage on tracks requires
maintenance and some are getting very muddy. Some additional waymarkers
required along the journey. From the Newmill end a mapboard would be useful
on the route. Currently gate locked on Addie Hill section obstructing access. 
3 2  3  2  3  3  3  3  2  3  3  3  4  43.5               
Page 278

Page 279

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-KT02 2 2 2 2 3 2 2 3 2 2 3 2 1 32.5
Garrowood Path - Grange              
KEITH              
Tarmac section of path is good. The aggregate vehicle track is in need of
drainage and re-surfacing which currently limits access, used by farm vehicles all
year round. Sorting this would increase access. Small bridge requires barriers
near Farmtown, waymarkers required on route. 
Fingerpost as missing feature at the junction to CCP26 TarryBlake Path included
on CCP26 audit.
Suitable for cyclists 
2 2  2  2  3  2  2  3  2  2  3  2  1  32.5               
Page 279

Page 280

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-KT03 2 2 3 2 3 3 2 3 2 3 3 3 1 37
Balloch Wood Path - Keith              
KEITH               
The vehicle aggregate tracks through Balloch Wood are good quality. Issues need
addressing once the path heads down towards the railway track leading to CPN-
KT02.  Entry into Balloch wood at this end needs improved at the narrow gate
and vegetation needs cut back.  The tarmac road at the railway bridge area is
also in need of some maintenance. A waymarker is required or a new fingerpost
at the junction where the route briefly passes into Aberdeenshire land at the
East section of this path - there is a waymarker post and fingerpost in this area
but none point in the direction 
2 2  3  2  3  3  2  3  2  3  3  3  1  37               
Page 280

Page 281

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-KT04 3 2 3 3 4 3 3 3 3 3 4 4 4 50
Auchoynanie Path - Keith              
KEITH               
This route runs on tarmac and aggregate roads, access is limited by hilly terrain,
however the route is popular with cyclists and walkers.  About one quarter of
this route, the Northern off-road section is muddy, overgrown and most of the
path is a barrier to access. During summer months the path will disappear under
vegetation (grass, willow herb, gorse) and water drains down from the nearby
road onto the path. Branches need pruned and the area may need checked for
giant hogweed, a lot of native hogweed is present.  There are ditches and
culverts on this off-road section requiring clearing/replacement and the path
may have aggregate under the earth. There is access for a mini-digger from the
East of this off-road section. The fingerpost leading onto this off-road path
section needs replaced. The Eastern end of the off-road route next to the public
road has an issue with fly tipping and recent fencing and monitoring is present,
this may require a barrier at the East end of the off road-path. The rest of the
route is mostly tarmac with a short aggregate vehicle track. The tarmac road is
narrow with HGV vehicles for Scottish Water and farms using the road. Narrow
verges with steep banks are an issue when pulling in to let vehicles by. 
Fingerpost Missing Feature at junction of CPN-KT04 AND CPN-KT03 added to
CPN-KT03 Balloch Wood Path audit.  Suitable for cyclists. 
3 2  3  3  4  3  3  3  3  3  4  4  4  50               
Page 281

Page 282

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-KT05 3 3 3 3 3 3 3 2 3 2 4 4 5 49.5
Dunnyduff Woodland Paths - Keith              
KEITH               
This route has the benefit of a car park giving easy access. The hilly terrain will
always limit access, however the route has some very exposed steep banks that
limit access around the waterfall area. There are a number of trees along the
route that need attention. Pruning and waymarking required along whole route,
especially at path crossroads. The small metal bridge may require maintenance
due to its condition. There are a number of muddy areas that require attention.
During this audit a 400m section of path was closed. 
3 3  3  3  3  3  3  2  3  2  4  4  5  49.5               
Page 282

Page 283

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-KT06 3 3 3 3 2 3 3 3 4 3 3 3 1 42
Den Path - Keith              
KEITH              
This route has many exposed steep banks requiring barriers. Tree
maintenance/assessment required as there are many dead and large trees along
the path. Fingerposts and waymarkers required to navigate side paths.  There
are some uneven areas with roots and muddy sections on the path, some
revetments required where edges of the path are eroding away. 
3 3  3  3  2  3  3  3  4  3  3  3  1  42               
Page 283

Page 284

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-KT07 3 3 4 3 3 2 4 3 4 2 4 4 1 46.5
Green Roadies Path - Keith              
KEITH               
This route is quite flat but has some really muddy sections on the vehicle tracks
from Ediniach road to the A95 road that are barriers to access. The roadside
path on the A95 is also a barrier being narrow and very close to the busy road.
Fingerposts and waymarkers required on this route from Ediniach road to the
A95. There is also a broken waymarker post and fingerpost on this section. The
graveyard gates can easily jam shut and are difficult to open if closed tightly.
Encroaching vegetation especially on the vehicle tracks may be a problem in the
summer. Route needs regular maintenance, bench near the graveyard needs
refurbished. 
3 3  4  3  3  2  4  3  4  2  4  4  1  46.5               
Page 284

Page 285

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-KT08 2 4 2 2 4 1 2 2 3 2 1 2 1 30.5
Town Centre Link - Keith              
KEITH              
This route is all on public road surfaces, however it does have a steep section
near to Old Town that may limit access. Waymarkers are required to navigate
streets and there are several raised kerbs. 
2 4  2  2  4  1  2  2  3  2  1  2  1  30.5               
Page 285

Page 286

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-KT09 1 3 1 2 4 1 3 4 2 1 1 1 1 27
Drum Road Path - Keith              
KEITH              
This route is all on public road or pavement surface. Waymarkers at both ends
needed and a lowered kerb on the pavement would improve access. 
1 3  1  2  4  1  3  4  2  1  1  1  1  27               
Page 286

Page 287

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-KT10 2 3 2 2 3 1 2 2 2 1 4 2 4 37
Lony Park Paths - Keith              
KEITH              
This route is very muddy when wet and this will limit access. There is a long
grass section that is muddy when wet, this leads onto a very muddy vehicle
aggregate track. In the middle of route where the grass path joins the vehicle
aggregate path is an untidy old gate and timbers across the path with a narrow
side path to go around, this is an access barrier and may require a new vehicle
gate with pedestrian gate. There are no waymarkers on the route, two finger
posts and a waymarker required. 
2 3  2  2  3  1  2  2  2  1  4  2  4  37               
Page 287

Page 288

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-KT11 2 4 3 4 3 1 3 3 4 1 2 2 1 36.5
Horse Market Lea Path - Keith              
KEITH              
This route is short and runs on tarmac paths and public road pavements.
Additional waymarkers required and some maintenance on the tarmac path near
the park to remove moss/mud. 
2 4  3  4  3  1  3  3  4  1  2  2  1  36.5               
Page 288

Page 289

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-KT12 1 2 1 2 4 1 2 3 2 1 1 1 1 24
Denwell Road - Keith              
KEITH              
This route runs on narrow public roads and pavements. All have good surfaces.
This route needs more waymarkers.  1  2  1  2  4  1  2  3  2  1  1  1  1  24               
Page 289

Page 290

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-KT13 3 3 3 3 3 2 3 3 2 1 4 3 4 44.5
Braehead Right of Way - Keith              
KEITH              
This path is mostly flat tracks and public roads. However the narrow, muddy
section between the fields is a barrier for access. Maintenance is also required
on the small footbridge at the bottom of this field section. 
3 3  3  3  3  2  3  3  2  1  4  3  4  44.5               
Page 290

Page 291

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-KT14 1 3 1 2 4 1 2 3 2 1 2 1 1 27
Seafield Park Road/Land Street - Keith              
KEITH              
This route runs on public roads and pavements.  There are a number of raised
kerbs restricting access and additional waymarkers required to navigate the
streets.  1  3  1  2  4  1  2  3  2  1  2  1  1  27               
Page 291

Page 292

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-KT15 1 3 2 3 3 1 3 3 3 1 2 1 1 30
Cuthil Park Paths - Keith              
KEITH              
This route runs through a small park. Waymarkers are required and
drainage/resurfacing on a muddy aggregate section of path.  1  3  2  3  3  1  3  3  3  1  2  1  1  30               
Page 292

Page 293

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-KT16 1 3 2 3 3 1 3 3 3 2 3 1 1 33
Cuthil Seafield Link - Keith              
KEITH              
Half this route runs on tarmac and the rest is on vehicle tracks. This route needs
some waymarkers between the park and the vehicle track end. The vehicle track
has some muddy sections that are ok to pass but will get worse over time. 
1 3  2  3  3  1  3  3  3  2  3  1  1  33               
Page 293

Page 294

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-KT17 1 3 2 3 3 2 3 3 3 2 4 1 1 36
Brandy Brae Path - Keith              
KEITH              
This path has a long section of earth/grass that will get muddy in the wet.
Waymarkers required to navigate multiple side paths and maintenance on
fingerposts required. The field with horses needs maintenance on the fence and
along the whole path there are steep banks in need of barriers. 
1 3  2  3  3  2  3  3  3  2  4  1  1  36               
Page 294

Page 295

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-KT18 2 3 2 3 3 3 3 2 3 2 3 2 1 36.5
Keith Old Cemetery Path              
KEITH              
This path mostly runs on public roads, however access is restricted by the terrain
over the river requiring steps. Waymarkers are required on this route and
surfacing on the track to the bridge. The bollard area in the pavement is a
barrier.  2  3  2  3  3  3  3  2  3  2  3  2  1  36.5               
Page 295

Page 296

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-KT19 2 3 3 3 2 2 3 2 3 1 3 2 4 39
Cottage Wood Path - Keith              
KEITH              
This route has a good path through the forest section but has some issues. The
steps at the forest before the road are a barrier and the muddy section of path
running beside the golf course and houses needs addressing. Tree maintenance
and waymarker maintenance required along the whole path. 
2 3  3  3  2  2  3  2  3  1  3  2  4  39               
Page 296

Page 297

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-KT20 2 3 3 3 2 1 3 2 3 1 3 2 1 33.5
Fife Park Path - Keith              
KEITH               
This route requires waymarkers, especially around the playing field area where
there is not a defined path. There are some barriers on the pavement sections
such at the fence across the path and
bollards.  The grass section will limit access especially when wet weather. 
2 3  3  3  2  1  3  2  3  1  3  2  1  33.5               
Page 297

Page 298

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-KT21 2 3 2 2 3 2 3 3 2 2 3 3 1 36
Toll House and Braehead Road - Keith              
KEITH              
Most of this route runs on public roads.  However the section that runs on
vehicle tracks over the River Isla requires maintenance. The bridge over the River
Isla is a barrier with steps either side, it is also in need of maintenance. Without
steps and some track maintenance this route would be possible to be cycled.
Safety signage on the public road section to alert vehicles to pedestrians would
improve this route. 
2 3  2  2  3  2  3  3  2  2  3  3  1  36               
Page 298

Page 299

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-KT22 3 2 3 2 3 2 3 3 2 2 5 4 5 48.5
Maisley Link - Keith              
KEITH              
This path is overgrown and muddy. Its condition is a barrier, but is a useful link.
There is signs of aggregate under the earth/mud and there are ditches either
side. Regular cutting of vegetation is required on this route, strimming twice a
year would allow better access - vegetation is also affecting the opening of gates.
Fences at both sides of the route have barbed wire on the path side and sections
of fence are broken. There are some deep ditch sections close to the path that
require barriers. 
3 2  3  2  3  2  3  3  2  2  5  4  5  48.5               
Page 299

Page 300

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-KT23 2 3 3 2 3 3 2 2 2 2 3 2 1 34.5
Drummuir Station Path-Drummuir              
Drummuir              
This route has a steep hill in the forest that will always limit access. The bridge
next to the railway station needs some maintenance and barriers are required on
the track down to the railway station, the public roadside fences are also in need
of repairs. Waymarkers required in the forest section as well as some tree
maintenance. Parking is available, the only barrier is the steep hill section in and
out of the forest. 
2 3  3  2  3  3  2  2  2  2  3  2  1  34.5               
Page 300

Page 301

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-KT24 2 2 2 2 3 2 2 2 2 1 2 2 1 28.5
Westerton Path - Drummuir              
Drummuir              
This route has some hilly terrain that will limit access, however the stepping
stones at the ford is a barrier that will limit the use of this section. Updating and
reviewing waymarkers would also improve this route, especially when joining
from other paths.  2  2  2  2  3  2  2  2  2  1  2  2  1  28.5               
Page 301

Page 302

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-LM01 3 3 3 2 3 3 3 3 2 3 4 3 5 48
College of Roseisle Path - Roseisle              
LOSSIEMOUTH               
This route has a lot of overgrown, muddy sections, some are barriers to access.
There are many broken waymarkers and additional waymarkers required to
navigate the forest area. There are two sets of steps requiring handrails and a
narrow bridge in the Western section. Around this area there is uneven ground
as old railway tracks have to be stepped over. The East section near College of
Roseisle has muddy sections and requires waymarkers to navigate the route.
There are sections of encroaching vegetation that need controlled here also. A
short section of path in the eastern area behind a house needs to be created to
form the  new core path; previous path has a fence across it and a temporary
path alternative is being used through the woodland. Additional waymarkers will
be required in this area. 
3 3  3  2  3  3  3  3  2  3  4  3  5  48               
Page 302

Page 303

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-LM02 2 2 3 2 3 2 2 3 2 2 4 3 2 38.5
Inverugie to Duffus Road Track - Duffus              
LOSSIEMOUTH              
This route runs on aggregate tracks. More than half of this route is on very pot
holed and muddy tracks that will be a barrier to access. There are no
waymarkers on this route, 2 fingerposts and waymarkers required. The route is
mostly flat and offers a quiet walk, more accessible in dry weather. 
2 2  3  2  3  2  2  3  2  2  4  3  2  38.5               
Page 303

Page 304

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-LM03 1 4 1 2 3 3 3 4 2 3 2 1 1 33
Hopeman to Duffus Cycle Link              
LOSSIEMOUTH              
This route runs on tarmac and public roads and pavements. Some additional
advisory Give Way signs required at road crossings and waymarkers required in
Duffus to navigate the streets. One "fence across the path" barrier is damaged
near Hopeman, this barrier is a plastic barrier instead of all metal. Some raised
kerbs as barriers for pedestrians in Duffus and minor encroaching vegetation at a
couple of points. 
1 4  1  2  3  3  3  4  2  3  2  1  1  33               
Page 304

Page 305

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-LM04 0 3 2 2 3 1 3 3 2 1 1 1 1 25
Duffus Hall Path              
LOSSIEMOUTH              
A short tarmac path with one road crossing. Waymarkers required at each end
and tactile paving at the road crossing.  0  3  2  2  3  1  3  3  2  1  1  1  1  25               
Page 305

Page 306

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-LM05 4 2 2 2 3 1 2 1 1 2 4 3 4 38.5
Duffus to Coast Route              
LOSSIEMOUTH               
This route has a lot of issues that require maintenance.
In the northern woodland section there are a number of dead trees requiring
attention and two redundant pedestrian gates that have paths around them.
Between the northern woodland and the fields the path is badly overgrown with
gorse. The field section north of East Road has a narrow gap as a barrier and a
possible electric fence on the path side. The fence on this section requires gaps
fill to make it stock proof.
In the South section, two thirds of the entire route runs on unsurfaced vehicle
tracks that will need cut in Summer to avoid the path becoming overgrown. 
4 2  2  2  3  1  2  1  1  2  4  3  4  38.5               
Page 306

Page 307

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-LM06 1 2 1 2 3 2 3 3 1 2 1 1 1 25
Duffus Green Roadie              
LOSSIEMOUTH              
This route runs on a straight aggregate track. There are a few muddy sections
and some encroaching vegetation but overall the track is good. 
1 2  1  2  3  2  3  3  1  2  1  1  1  25               
Page 307

Page 308

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-LM07 2 1 2 2 3 1 2 3 2 1 3 2 1 29.5
Plewlands Coastal Link - Covesea              
LOSSIEMOUTH              
This route has some muddy sections and encroaching vegetation on the south
section of the B9040. This section may get badly overgrown in Summer unless
cut. The gate area near the B9040 has a problem with cars parking in the narrow
passing place and also vehicles driving up the track towards the coast. The track
in the north section leading to the coastal path is very muddy when wet and
requires drainage ditches and culverts to avoid the track becoming a ditch itself.
Waymarkers required on this route. 
2 1  2  2  3  1  2  3  2  1  3  2  1  29.5               
Page 308

Page 309

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-LM08 2 2 2 2 3 2 3 3 2 2 3 2 4 38
Covesea Path - Lossiemouth              
LOSSIEMOUTH              
Half of this route runs on aggregate track that is badly worn in places leaving pot
holes filled with water. The short section of aggregate path requires the existing
ditches to be cleared as well as a blocked culvert to be fixed. Vegetation is bad
on the aggregate path section and will require cut to avoid the path becoming
overgrown. 
2 2  2  2  3  2  3  3  2  2  3  2  4  38               
Page 309

Page 310

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-LM09 2 3 3 3 3 2 3 2 3 1 3 2 1 35.5
Burghead Woodland Route              
LOSSIEMOUTH              
Additional waymarkers and fingerposts required to navigate this route. Some
existing waymarkers are broken and some are confusing with arrows for other
routes. A redundant kissing gate at the Western side could be removed. There is
some encroaching vegetation on the Western side of the route.  Also on the
West side is a set of timber steps that requires maintenance and a handrail.  A
few uneven sections with tree roots and some muddy sections leading up to the
B9013 main road 
2 3  3  3  3  2  3  2  3  1  3  2  1  35.5               
Page 310

Page 311

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-LM10 3 3 3 3 3 3 3 2 3 2 4 4 5 49.5
Clarkly Hill Path - Burghead              
LOSSIEMOUTH              
Around 30% of this route is overgrown with gorse and is a barrier to access. The
field track to the East has a lot of muddy sections and encroaching vegetation in
the summer. The tarmac section is good. There are two redundant pedestrian
gates near the field tracks. There are side paths for other routes nearby,
additional waymarkers required. 
3 3  3  3  3  3  3  2  3  2  4  4  5  49.5               
Page 311

Page 312

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-LM11 2 3 3 3 3 2 2 2 2 2 3 2 1 34.5
Clarkly Hill Cummingston Link              
LOSSIEMOUTH               
This route requires additional waymarkers. The north section at the park is
muddy and overgrown.  The southern section on the field track is very muddy
and looks to get overgrown with grass in the summer.  The south end of this
route at the top of the hill has a rope across the path used by the pig farm, this
may be temporary but restricts access. A gate is required here and warning signs
as this area is heavily used by the pig farm moving livestock. 
2 3  3  3  3  2  2  2  2  2  3  2  1  34.5               
Page 312

Page 313

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-LM12 3 3 3 3 4 3 3 3 3 2 3 3 4 46.5
Clarkly Hill Coastal Link - Cummingston              
LOSSIEMOUTH              
Half this route runs on public roads. The other northern half is muddy and
overgrown with grass and gorse. Some fencing required on the stone bridge at
the northern section and a new waymarker. 
3 3  3  3  4  3  3  3  3  2  3  3  4  46.5               
Page 313

Page 314

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-LM13 1 3 2 3 4 3 3 3 3 4 1 1 1 34
Drummuir Street - Hopeman              
LOSSIEMOUTH              
This path runs mostly on tarmac public pavements. Some raised kerbs as barriers
and a muddy section on the aggregate path.  1  3  2  3  4  3  3  3  3  4  1  1  1  34               
Page 314

Page 315

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-LM14 1 3 2 3 4 3 3 3 3 3 1 1 1 33
Harbour Street - Hopeman              
LOSSIEMOUTH              
Waymarkers required on this route.  There are some raised kerbs as barriers and
dropped kerbs missing tactile paving. A short section at the road bridge requires
pedestrians to use the road.  1  3  2  3  4  3  3  3  3  3  1  1  1  33               
Page 315

Page 316

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-LM15 1 2 2 2 3 2 2 3 2 2 1 1 1 26
Hopeman Inverugie Path              
LOSSIEMOUTH              
This route runs mostly on aggregate vehicle tracks in good condition. A way
marker and fingerpost at the junction of CPN-LM18 and CPB-LM02 is required
and some pruning on the existing fingerpost. There is a minor muddy section on
the aggregate track. 
1 2  2  2  3  2  2  3  2  2  1  1  1  26               
Page 316

Page 317

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-LM16 1 4 1 4 4 1 2 3 3 1 1 1 1 29
Hopeman Primary School Cycle Link              
LOSSIEMOUTH              
This route runs on public road roads and pavements. Waymarkers required to
navigate the streets.  A few raised kerbs as barrier for pedestrians. 
1 4  1  4  4  1  2  3  3  1  1  1  1  29               
Page 317

Page 318

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-LM17 2 3 3 3 3 3 3 3 3 2 3 1 4 41.5
Hopeman East Path              
LOSSIEMOUTH              
40% of this route runs on public roads/pavements and tarmac. The 60% north
earth section to the beach has some very muddy areas and has encroaching
vegetation in places. The south public road section to the road junction has no
pavement for the last 45m requiring individuals to continue on the public road or
walk on the grass, a new path here would allow road free travel from Duffus to
Hopeman beach. 
2 3  3  3  3  3  3  3  3  2  3  1  4  41.5               
Page 318

Page 319

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-LM18 3 2 3 2 3 2 2 2 2 1 5 3 5 44
Pickylaw Path - Hopeman              
LOSSIEMOUTH              
This route is mostly muddy and overgrown.  A short section in the north next to
a gate is very uneven and is a barrier. In the Summer, unless cut, this path may
be too overgrown to use.  3  2  3  2  3  2  2  2  2  1  5  3  5  44               
Page 319

Page 320

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-LM19 2 3 2 3 3 4 3 4 3 4 2 2 1 39.5
Lossie to Elgin Cycle Route              
LOSSIEMOUTH              
This route requires additional waymarkers.  The route from the car park and
grass section at Muirton road needs development to bring the route into the
same quality level as the rest of the route.  Give Way Advisory bollards and
tactile paving is missing from road crossings (10 crossings) and there are a couple
sections of low tarmac that holds water and create wet areas. Recent drainage
side-let ditches at the roadside drain off near to the cycle path and maybe
causing additional water on the path 
2 3  2  3  3  4  3  4  3  4  2  2  1  39.5               
Page 320

Page 321

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-LM20 2 3 3 2 3 2 3 4 2 2 3 3 2 39.5
Moray Golf Course path - Lossiemouth              
LOSSIEMOUTH              
This route needs waymarkers to navigate the golf course.  The area with most of
the issues is at the road crossing at Stotfield Road/B9040. This road can be busy
and two raised kerbs here are barriers. The gap to the side the barrier pole next
to the road crossing is narrow.  The rest of the route has muddy sections and
encroaching gorse. This route could be all ability as a car park is located at one
end. 
2 3  3  2  3  2  3  4  2  2  3  3  2  39.5               
Page 321

Page 322

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-LM21 1 3 2 2 4 1 2 3 2 1 1 1 1 26
Drainie Way - Lossiemouth              
LOSSIEMOUTH              
Waymarkers required on this route.  Tactile paving at dropped kerbs and
replacing raised kerbs would improve access. However path runs on public
tarmac pavements and roads with some encroaching vegetation from private
gardens requiring cut back.  1  3  2  2  4  1  2  3  2  1  1  1  1  26               
Page 322

Page 323

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-LM22 2 4 2 3 4 1 3 4 3 2 1 2 1 34.5
Hythehill/Lossie High School Safe Routes              
LOSSIEMOUTH              
This route requires waymarkers to navigate the streets. Advisory Give Way
signage and tactile paving at road crossings where bikes cross would improve
safety and access. There are some narrow sections in between wide pavements.
Steps near the school are a barrier but has a path that goes round this. A dead
tree near the school requires removal/further assessment. 
2 4  2  3  4  1  3  4  3  2  1  2  1  34.5               
Page 323

Page 324

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-LM23 1 4 3 3 4 0 3 4 3 1 1 2 1 32.5
Boyd Anderson Community Path Lossiemouth              
LOSSIEMOUTH              
This network of paths requires waymarkers to navigate the many routes. There
are 3 sets of steps as barriers and some raised kerbs. Additional street lighting
would benefit a couple of dark passages. Several sections have encroaching
vegetation from private houses. Vehicles are crossing the grass area and path
area to the South of the route. There are many worn sections of tarmac on the
paths as well as moss growing on the worn sections. Tactile paving is also
missing at several road crossings. 
1 4  3  3  4  0  3  4  3  1  1  2  1  32.5               
Page 324

Page 325

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-LM24 3 4 2 3 3 0 3 4 3 2 4 2 4 44
High School Path - Lossiemouth              
LOSSIEMOUTH              
Half this route runs on excellent wide tarmac with street lights. The other half
runs on muddy grass, with a narrow gap as a barrier and no street lights. Being a
school path the grass section needs a better surface and potentially street
lighting.  A steep grassy hill would benefit from a ramp. 
3 4  2  3  3  0  3  4  3  2  4  2  4  44               
Page 325

Page 326

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-LM25 1 3 2 3 4 0 2 3 3 1 1 2 1 28.5
Ramsay Lane Link - Lossiemouth              
LOSSIEMOUTH              
This route runs mostly on public road pavements.  This route has some raised
kerbs and a steep slope as barriers. Way markers required to navigate the
streets.  1  3  2  3  4  0  2  3  3  1  1  2  1  28.5               
Page 326

Page 327

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-LM26 2 3 2 3 4 0 2 3 3 2 3 2 1 34.5
Football Ground Path - Lossiemouth              
LOSSIEMOUTH              
A short winding route through streets with barriers.  This route has a few raised
kerbs as barriers. The road crossing across Elgin Road can be too busy to cross
easily. The steps at the junction to CP-LM27 are a barrier, however there is
space for a ramp here. Waymarkers required to navigate around the numerous
streets.  2  3  2  3  4  0  2  3  3  2  3  2  1  34.5               
Page 327

Page 328

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-LM27 3 2 3 3 3 1 3 4 3 2 3 3 4 43.5
Old Railway Path to Cemetery - Lossiemouth              
LOSSIEMOUTH              
This route has good access on the tarmac sections. The aggregate path is getting
overgrown and has some muddy sections.  The steps and ramp area at
Inchbroom Road is a barrier being narrow and steep. Half of this route to the
cemetery is also unlit however this section is less populated. This route is busy
with cyclists and pedestrians. 
3 2  3  3  3  1  3  4  3  2  3  3  4  43.5               
Page 328

Page 329

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-LM28 1 3 2 3 3 1 2 3 3 1 3 2 1 32.5
Spynie Canal Path - Lossiemouth              
LOSSIEMOUTH              
This short route has some raised kerbs as barriers and a small footbridge in poor
condition will need extensive repairs.  Waymarkers required along route. 
1 3  2  3  3  1  2  3  3  1  3  2  1  32.5               
Page 329

Page 330

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-MCT01 2 3 3 3 2 4 4 3 3 4 2 2 1 39.5
M.Coast Trail - Findhorn Beach Link              
Moray Coast Trail               
This route needs some additional waymarkers to navigate the dune section.
There is a broken fingerpost near the apartment block. There are a lot of new
"no cycling" signs on the Southern section and a mapboard that is in poor
condition, however this could be community owned.
There is a raised kerb before coming onto the water front in the southern section
and also some wet patches on the aggregate path there. The concrete path on
the waterfront has a short steep section that ideally should have a barrier. 
2 3  3  3  2  4  4  3  3  4  2  2  1  39.5               
Page 330

Page 331

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-MCT02 3 2 2 2 2 4 3 2 2 4 3 3 1 38
M.Coast Trail - Findhorn Dunes              
Moray Coast Trail               
This route has some sections of path running very close to an eroded coastline.
The Kinloss Barracks fence needs moved by the MOD urgently. One section of
path is on the eroded edge and a new path line is recommended to be
established to direct users away from the edge. Trees along this eroded edge
need further assessment. The path alongside the MOD fenceline is narrow but
encroaching vegetation is at a minimum, will need annual checks to avoid path
getting narrower. In the dune section a fingerpost needs replaced and some
more waymarkers required. Some existing waymarkers are too short and need
replaced. Some vegetation and a tree need cut back from the dune section. 
3 2  2  2  2  4  3  2  2  4  3  3  1  38               
Page 331

Page 332

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-MCT03 1 2 2 2 3 4 3 4 2 4 2 1 1 34
M.Coast Trail - Roseisle Section              
Moray Coast Trail              
Additional waymarkers required on this route to navigate the various paths.
Several short existing waymarkers need replaced. There are several soft sand
sections that make it difficult for bikes/mobility scooters. There are a couple of
sections where encroaching gorse needs cut back and a bridge requiring barriers.
A long path mainly running on aggregate vehicle tracks. 
1 2  2  2  3  4  3  4  2  4  2  1  1  34               
Page 332

Page 333

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-MCT04 1 3 2 3 2 4 2 1 3 3 3 2 1 34.5
M.Coast Trail - Burghead              
Moray Coast Trail               
Although 70% of this route runs on aggregate and tarmac surfaces, the section
that runs around the fort area has uneven ground and steep exposed sections of
path that limits access.  The aggregate track that runs on the northern section
has some large pot holes where puddles will form. The tarmac area by the
harbour is good, just missing some tactile paving in places. There is a lack of
waymarkers with MCT on them around the fort area, this section is difficult to
find and follow. The section through the caravan park also needs a waymarker.
The fingerpost near Station Road points the MCT route down Brander Street
which is confusing. The fingerpost near the caravan site points towards the
wrong track. Overall the waymarking is confusing due to a lack of MCT
waymarkers and other brown waymarking posts and fingerposts. 
1 3  2  3  2  4  2  1  3  3  3  2  1  34.5               
Page 333

Page 334

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-MCT05 1 4 2 4 3 4 4 4 3 4 2 2 1 41.5
M.Coast Trail -Old Coastal R'way Hopeman              
Moray Coast Trail               
This route runs on tarmac and aggregate surfaces. Some encroaching vegetation
on the path sections, this can be controlled with annual cutting/strimming back.
A timber fence at Burghead needs some maintenance on wobbly and broken
sections.  There are some muddy sections at the Burghead end.
There is a very large community dog fouling sign at the East end of this route,
along with 2 other notices nearby. In the middle of this route some side rock
faces have had recent stones detach, this may require further assessment 
1 4  2  4  3  4  4  4  3  4  2  2  1  41.5               
Page 334

Page 335

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-MCT06 1 3 2 3 3 3 3 3 2 2 2 2 1 33.5
M.Coast Trail - Hopeman Caravan Park              
Moray Coast Trail              
This route runs on tarmac and aggregate paths.  Waymarkers required to
navigate the route. Some encroaching vegetation and a muddy section on the
aggregate track in the South section  1  3  2  3  3  3  3  3  2  2  2  2  1  33.5               
Page 335

Page 336

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-MCT07 1 2 3 4 3 4 3 3 3 4 2 3 1 40
M.Coast Trail - Hopeman Bay              
Moray Coast Trail               
Half of this route runs on tarmac surfaces. The aggregate section requires some
cutting back of vegetation and the earth/sand section also has encroaching gorse
and a narrower path. Waymarkers required to navigate the car park area, there
are a range of routes and is confusing where the MCT actually goes.
At the Hopeman car park area next to the beach huts there are too many signs.
There is a very large sign about dog fouling by the Hopeman community, 3
fingerposts, 1 is a duplicate and the very tall fingerpost has rot. 
1 2  3  4  3  4  3  3  3  4  2  3  1  40               
Page 336

Page 337

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-MCT08 3 2 4 2 3 4 3 2 2 4 4 3 4 47.5
M.Coast Trail - Clashach to Covesea              
Moray Coast Trail               
This route has a lot of muddy sections on the Eastern section, most are due to
the neighbouring field draining onto the path. To solve this drainage and ditches
would be needed, especially near the lookout tower. The east section of this
route requires vegetation to be strimmed annually as without cutting the path
quickly becomes overgrown. Gorse on this Eastern section is narrowing the path
and ditches and culverts on the Eastern section are blocked. A field runs right up
to the path near the lookout tower raising concerns for machinery operating
close to the path, this may require the path to be moved away from the field
edge. There are quite a lot of waymarkers on this section that could be spread
out. On the Western section, encroaching gorse, uneven/muddy ground and old
steps are issues. 
3 2  4  2  3  4  3  2  2  4  4  3  4  47.5               
Page 337

Page 338

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-MCT09 2 2 3 2 2 4 3 2 2 4 3 2 1 36.5
M.Coast Trail - Silver Sands Lossiemouth              
Moray Coast Trail               
The section of path near the car park at Lossiemouth has eroded away leaving an
uneven shingle section.  An overgrown side path is the only route when the tide
is in, this side path will need vegetation managed to allow access to the dunes
when it is high tide. Further West, the route has again eroded away leaving only
shingle to walk on. The path next to the golf course is overgrown and difficult to
follow at times. Further West going towards the Lighthouse the path needs
waymarked and is badly overgrown in places. At the Lighthouse area a steep
section down the side of the Lighthouse is a barrier and the path next to the
Lighthouse gate gets badly overgrown if not cut. 
2 2  3  2  2  4  3  2  2  4  3  2  1  36.5               
Page 338

Page 339

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-MCT10 2 3 2 3 3 4 3 2 2 4 3 2 1 38.5
M.Coast Trail - Lossiemouth              
Moray Coast Trail               
Although this route runs on wide tarmac and public pavements there are still
barriers on this route. This route links both popular beaches in Lossiemouth, the
east beach section high has access.  Waymarkers are required along the route
and existing waymarkers need adjusted. Steps are a barrier near to the pavilion
and tactile paving required on pavement sections and street lighting around the
Marina near the museum. The earth path route closer to West Beach is quite
uneven and muddy and restricts access - improving this section would allow the
two beaches to be easily accessed. 
2 3  2  3  3  4  3  2  2  4  3  2  1  38.5               
Page 339

Page 340

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-MCT11 1 2 3 2 2 4 2 2 2 4 2 2 1 32.5
M.Coast Trail - Lossiemouth Kingston              
Moray Coast Trail               
The terrain and length of path on this route will always limit access. A flat route
across sandy beach and a winding route through shingle and sand dunes. A tall
waymarker is required where the beach at Lossiemouth ends and the shingle
dunes path begins. Existing waymarker posts and fingerposts need replacing and
additional waymarking required at the Kingston end. At the military firing range
warning signs required in this area. The two firing range watch towers at the
Kingston area are in poor condition and buildings and signage around this area
need attention. Many concrete shelters near the path are in poor condition. This
route has a lot of litter and marine waste piled and left at the side of the path
that needs removed.  The track at Kingston to the firing range has some large
wet areas.  Restricting vehicles on this track would reduce wear and tear. 
1 2  3  2  2  4  2  2  2  4  2  2  1  32.5               
Page 340

Page 341

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-MCT12 2 4 3 2 3 4 3 2 2 4 4 2 4 46
M.Coast Trail - Kingston to Garmouth              
Moray Coast Trail               
This route runs through Garmouth on narrow roads and pavements, a couple of
raised kerbs and narrow pavements here as barriers. A third of this path runs on
a narrow track above Garmouth, this is a barrier with narrow muddy tracks with
steep sections and exposed steep banks.  Waymarkers required on this route.
The low lying section before coming onto CP-MCT11 looks to flood often, is
muddy and has an old concrete bridge requiring further assessment/inspection. 
2 4  3  2  3  4  3  2  2  4  4  2  4  46               
Page 341

Page 342

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-MCT13 1 3 2 3 4 4 4 4 2 4 1 2 1 37.5
M.Coast Trail - Spey Viaduct Link              
Moray Coast Trail              
This route is mostly all tarmac and flat. Some repairs to a bollard and signage
required. Will need regular pruning. The viaduct bridge needs trees pruned back
at one end and some path panels that have movement fixed down. There are
some steep banks requiring barriers and some fences around the other bridges
are poor with movement in posts. Tree roots are making sections of the tarmac
path uneven. 
1 3  2  3  4  4  4  4  2  4  1  2  1  37.5               
Page 342

Page 343

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-MCT14 1 3 3 3 3 4 3 4 3 4 3 1 1 40
M.Coast Trail - Portgordon Old Railway              
Moray Coast Trail               
There are some steep drops requiring barriers at the Buckpool bridge end. A
ditch on the Buckpool to Portgordon section is required to manage muddy
sections. The Portgordon section has a lot of narrow, muddy sections. Missing
drainage and partially blocked ditches are creating muddy sections as well as
vehicle access.
Encroaching grass is narrowing the path, so much so, the path is now classed as
narrow rather than originally being wide. The road crossing area requires more
safety signage and a wet area is making the path and steps in this area very wet
and muddy. Towards the Portgordon end there are some dead trees requiring
further assessment.
Restricting vehicle access to this path would limit damage to the surface. 
1 3  3  3  3  4  3  4  3  4  3  1  1  40               
Page 343

Page 344

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-MCT15 1 3 2 3 4 4 3 3 3 4 2 1 1 37
M.Coast Trail - Portessie Bay              
Moray Coast Trail               
This route runs mostly on tarmac surfaces and public roads. The East section at
Strathleen requires more waymarkers as it is confusing whether the route goes
on the grass or the road. Along the road side sections to Ianstown there are
some narrowing pavements. Some raised kerbs as barriers around the harbour
area and additional waymarkers require in and around Buckpool end. 
1 3  2  3  4  4  3  3  3  4  2  1  1  37               
Page 344

Page 345

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-MCT16 1 3 3 2 2 4 3 1 2 4 3 1 1 34
M.Coast Trail - Strathlene to Findochty              
Moray Coast Trail              
This path has some rocky and narrow sections that will always limit access.
Some encroaching gorse is narrowing the East section and there are some
muddy sections near the golf course. There are a couple of sections near the
golf course that may require barriers due to being next to steep drops. Warning
signs advising of rocky areas advised before approaching Strathlene. Some
muddy sections on the aggregate path to Strathlene need ditches and culverts
cleared. Additional waymarkers would navigate around the streets and side
paths on the route. 
1 3  3  2  2  4  3  1  2  4  3  1  1  34               
Page 345

Page 346

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-MCT17 1 3 2 2 4 4 3 3 2 4 2 2 1 36.5
M.Coast Trail - Findochty              
Moray Coast Trail              
This route runs mostly on public roads. Additional waymarkers required to
navigate the streets. Some existing waymarkers need replaced. The East section
at the beach, the path is difficult to follow as the path is grass and a new
aggregate track goes in the direction of the fingerpost, however the waymarker
where the path goes gets obscured by parked cars. There are some steep
exposed drops at the harbour area in need of fencing. Some raised kerbs at the
harbour also limit access to the bench area. 
1 3  2  2  4  4  3  3  2  4  2  2  1  36.5               
Page 346

Page 347

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-MCT18 3 3 3 3 3 4 3 4 2 4 3 3 4 48.5
M.Coast Trail - Findochty to Portknockie              
Moray Coast Trail              
This route runs on aggregate path. There are many muddy sections on the path
with one bad enough to be a barrier. The path is ageing and grass is narrowing
the aggregate, some sections are less than 50cm wide. Despite the muddy
sections this path is busy, however during wet weather the quality of the route
worsens. 
3 3  3  3  3  4  3  4  2  4  3  3  4  48.5               
Page 347

Page 348

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-MCT19 1 3 2 2 4 4 2 3 2 4 1 1 1 32
M.Coast Trail - Portknockie              
Moray Coast Trail              
This route runs on public tarmac roads with good access.  A waymarker is
required to avoid going down to the harbour. There is a poor road crossing at
the Western end that has a blind corner.  1  3  2  2  4  4  2  3  2  4  1  1  1  32               
Page 348

Page 349

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-MCT20 2 3 2 2 3 4 3 1 2 3 3 2 1 35.5
M.Coast Trail - Cullen Bay              
Speyside               
This route has some steep sections that will always limit access.
The beach does not have ramp access but one could be created at the end of the
concrete walkway.
The rocky section at the western end of Cullen beach is a barrier and the steps
leading to Portknockie needs a handrail. The path going around the cliff edge
towards Portknockie is very close to steep cliffs and needs fencing. There are
some muddy and uneven sections between the beach and Portknockie The path
at Portknockie has recently been resurfaced and has improved access. Most of
the waymarkers need replaced and additional ones required. Signage required
warning path at the beach/rocks only passable at low tide. 
2 3  2  2  3  4  3  1  2  3  3  2  1  35.5               
Page 349

Page 350

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP01 2 2 2 2 3 2 2 3 2 3 2 2 1 31.5
Burn of Rothes/Mannoch Road - Rothes              
Speyside               
Although this route has steep hills and goes into some remote areas, it is
accessible for bikes, walkers, horses. The route needs more waymarkers and
fingerposts especially above Rothes going through the forestry tracks. Gated
areas and a barrier pole leading down towards Thomshill cause barriers as either
the gates don't open fully or are difficult to open.  The barrier pole up from
Thomshill is a barrier as there is only a narrow gap to pass.  New ditches and
resurfaced forestry tracks make this route fairly easy on a bike. There is a short
section on the Mannoch road where a new 300m section of track has been
created - this leaves the original 300m path route section overgrown and
redundant - this may need to be removed or refurbished. 
2 2  2  2  3  2  2  3  2  3  2  2  1  31.5               
Page 350

Page 351

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP02 4 4 3 3 3 4 3 4 2 4 3 3 1 46
Glenfiddich Way - Dufftown              
Speyside              
This route has a lot of exposed steep banks that require attention, this may
require barriers. Resurfacing and drainage required along this route as well as
waymarkers. A fairly flat route would be great for cycling as well as having car
parks close to each end with the potential for disabled access. This route could
be all ability.2landslip areas and bridge undercutting would involve expensive
engineering works to completely resolve. 
4 4  3  3  3  4  3  4  2  4  3  3  1  46               
Page 351

Page 352

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP03 3 3 3 2 3 3 3 2 2 3 5 4 5 50.5
The Gownie Path - Aberlour to Dufftown              
Speyside               
This route will always be limited by the hilly nature of the terrain. Half of the
route from Aberlour to the top of the forest hill is good, the other half down to
Dufftown needs work. The route coming down through the forest and moorland
overlooking Dufftown is badly overgrown and requires drainage. The route has
also been changed coming down to the water treatment area at the distillery
site, this requires fingerposts and waymarkers. The double fenced area on the
last section to Dufftown is badly overgrown with gorse and needs a lot of work
to make this section accessible. 
3 3  3  2  3  3  3  2  2  3  5  4  5  50.5               
Page 352

Page 353

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP04 2 2 2 2 3 3 3 3 2 3 3 2 1 35.5
Glenrinnes Way-Dufftown              
Speyside              
This path has a good aggregate path that is grassing over and becoming muddy.
Route requires maintenance on path by scraping off grass and addressing
drainage along roadside sections. At times the path is narrow and close to the
main road.  Waymarkers required. 
2 2  2  2  3  3  3  3  2  3  3  2  1  35.5               
Page 353

Page 354

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP05 1 2 1 2 4 2 2 3 2 2 1 1 1 26
Burn Brae - Dufftown              
Speyside              
This route runs on public roads and has a good level of access already. Adding
waymarkers would better highlight the route.  1  2  1  2  4  2  2  3  2  2  1  1  1  26               
Page 354

Page 355

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP06 3 3 3 3 3 3 4 1 2 2 3 3 5 45
Giant’s Chair Path - Dufftown              
Speyside               
This is a hilly route that will always limit access. This path has many issues that
limit accessibility. This path has a lot of large standing dead trees within falling
distance of the path that need further assessment. There are a lot of exposed
steep banks that will be barriers to those with young children or less confident
walkers, fences required on these sections.  There are a lot of furniture items
that will require maintenance, many new items have been built by the
community such as bridges and handrails that have improved the path, however
a short section of new steps is in need of repair and old steps requiring
attention. The long bridge at the Giants chair area requires maintenance. The
giants chair area has a couple of side paths with furniture/small
bridge/viewpoint that need attention.    Overall a great path but needs a lot of
lot work and maintenance. 
3 3  3  3  3  3  4  1  2  2  3  3  5  45               
Page 355

Page 356

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP07 3 3 3 2 3 3 3 1 2 2 4 3 5 45
Gordon’s Cross Path - Dufftown              
Speyside               
The riverside section of this route needs a lot of work due to muddy, overgrown
tracks and tree maintenance. Waymarker maintenance is also required on this
section. Cattle have also been on this riverside path. Both ends of the riverside
section have steps and steep banks limiting access and the roadside section
requires some safety barriers. There are a few muddy sections leading back to
Dufftown, one track has holes in the livestock fence. The worst muddy section is
in a field where cattle graze, this is very muddy and has a lot of path side trees
requiring further assessment. This field will also be a barrier if livestock are
present.  Some additional waymarkers required and barriers to steep river banks. 
3 3  3  2  3  3  3  1  2  2  4  3  5  45               
Page 356

Page 357

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP08 3 3 4 3 2 3 3 3 3 2 3 4 5 48.5
Maister’s Well Path - Dufftown              
Speyside               
During auditing the top end of this route had some digging works at the end of
Cowie Avenue that was limiting access to the path. The forest walk paths need
some work to improve access. The path is muddy, not level and overgrown in
places. There are also a number of trees requiring further assessment. Barriers
are required on steep banks and repairs to existing fences required. During
auditing a fallen tree had smashed the shelter on this route. Waymarkers are
required on this route, especially on the forest section. 
3 3  4  3  2  3  3  3  3  2  3  4  5  48.5               
Page 357

Page 358

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP09 1 4 2 3 4 2 3 4 3 2 1 1 1 33
Dufftown Town Centre Link              
Speyside               
This route is easily accessible but has some barriers. Narrow pavements at the
top of the route and raised kerbs across side roads and driveways are barriers.
Some waymarkers would also improve access.  Road crossing across the A941
can be difficult when the roads are busy. More tactile paving sections on road
crossings would improve access and replacing raised kerbs. The mapboard for all
the walks is nearby this path at the clock tower but not easy to find. 
1 4  2  3  4  2  3  4  3  2  1  1  1  33               
Page 358

Page 359

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP10 3 3 3 2 3 2 2 2 2 1 4 3 1 37
Steepie Brae Path - Dufftown              
Speyside              
This path mainly consists of a steep, muddy track and all features require
attention. Fingerposts required a both ends and the pedestrian gate and
benches needs attention. Access will always be limited by the steep terrain,
however improving the drainage and cutting back vegetation will improve
access.  3  3  3  2  3  2  2  2  2  1  4  3  1  37               
Page 359

Page 360

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP11 3 3 3 2 3 3 3 2 2 1 4 3 5 45
Meg’s Wood Path - Dufftown              
Speyside               
This well used route needs improvement and maintenance. The route from
Church Street up to Megs wood is muddy, narrow in places and has broken
waymarkers, leaning fences also need attention. In Megs wood there is a warren
of paths that is difficult to navigate, waymarkers required. The whole of Megs
wood path network could do with tree inspections as there are many fallen and
dead trees around paths.  The concrete shelter in Megs Wood is in need of
further inspection, it does not look particularly inviting. 
3 3  3  2  3  3  3  2  2  1  4  3  5  45               
Page 360

Page 361

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP12 3 3 3 2 3 4 4 1 2 2 4 4 5 48.5
Dounie Path - Rothes              
Speyside              
The hilly terrain will always limit access to this path.  However this path is 
missing waymarkers, especially at the distillery end. Whole path has drainage
issues as well as barriers required to protect against steep drops. Maintenance is
required on trees lower down the path and further work to tidy and clear
windblown trees on higher ground. The path is well used and could do with a
refresh to make the experience better. 
3 3  3  2  3  4  4  1  2  2  4  4  5  48.5               
Page 361

Page 362

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP13 3 3 3 3 3 3 3 1 2 1 4 3 5 45
Rothes Castle Paths              
Speyside              
This path is not very accessible due to uneven ground, encroaching vegetation
and lack of drainage. The short side path going to the tarmac road below the
castle is too overgrown to use. Tree maintenance is required on this path with
many dead and damaged trees near the path. Waymarkers are also required as
additional paths have been created off this route. 
3 3  3  3  3  3  3  1  2  1  4  3  5  45               
Page 362

Page 363

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP14 1 4 2 2 4 2 3 3 2 2 1 2 1 31.5
High Street Link - Rothes              
Speyside              
This route runs on public road pavements. Road crossing across Rothes High
Street can be difficult if there is a lot of traffic. Nearby pedestrian crossing is
available.  The whole route needs waymarkers and mapboard could do with a
new map to show all the routes in Rothes. Waymarkers would need to be
planned and combined with other joining routes, CP-SP01, CP-SP13, CP-SP16, CP-
SP15, CP-SP12. 
1 4  2  2  4  2  3  3  2  2  1  2  1  31.5               
Page 363

Page 364

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP15 1 4 1 3 3 1 3 4 3 1 1 0 1 27.5
Rothes Primary School Safe Route              
Speyside              
This route has good wide tarmac paths and is all ability.  There is a car park with
disabled bay, electric charging and toilets. Waymarkers required and safety
signage for bicycles and vehicles.  1  4  1  3  3  1  3  4  3  1  1  0  1  27.5               
Page 364

Page 365

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP16 0 3 1 3 4 2 3 3 2 1 1 0 1 25.5
Green Street - Rothes              
Speyside              
This route is all on public roads and pavements.  Waymarkers required.  0  3  1  3  4  2  3  3  2  1  1  0  1  25.5               
Page 365

Page 366

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP17 1 2 1 2 3 3 3 3 2 2 3 1 1 31
River Spey Path - Rothes              
Speyside              
This route is mostly on aggregate tracks but have two narrow, muddy sections as
barriers either end. This route could have better access with some resurfacing
and drainage. Some steep banks may require barriers. Way markers required
along route and some trees requiring further assessment. 
1 2  1  2  3  3  3  3  2  2  3  1  1  31               
Page 366

Page 367

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP18 3 4 2 3 3 3 3 4 3 3 3 2 1 41.5
Old Railway Path - Rothes              
Speyside              
This route runs mostly on vehicle tracks. There are a number of muddy sections
that could do with resurfacing. The vehicle track and aggregate section next to
the car park would also benefit from street lighting. 2 raised kerbs are barriers
and some waymarkers required.  Vehicles appear to be exiting from the
aggregate track onto the public road where access for this is not provided, a
bollard may be required for safety. Access on the vehicles tracks may be blocked
when vehicles are using it. 
3 4  2  3  3  3  3  4  3  3  3  2  1  41.5               
Page 367

Page 368

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP19 0 3 1 2 4 3 2 3 2 3 1 0 1 26.5
Tamdhu Road - Knockando              
Speyside              
All tarmac surfaces already allows good access to the Speyside Way, especially
for bikes, however improving the bridge areas and steep banks on the public
road sections would make a better experience. Some ageing fences at the
distillery end need to be addressed. 
0 3  1  2  4  3  2  3  2  3  1  0  1  26.5               
Page 368

Page 369

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP20 2 3 2 2 3 3 2 3 2 3 3 3 1 37
Lower Mannoch Path - Knockando              
Speyside              
Path is limited by its hilly terrain. However the section from the houses and
school to the B9102 road could be greatly improved for access. 
2 3  2  2  3  3  2  3  2  3  3  3  1  37               
Page 369

Page 370

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP21 3 2 4 2 3 3 3 2 2 1 4 4 5 46.5
Short Forest Circular Path - Archiestown              
Speyside              
Half of this path is in poor condition due to encroaching vegetation and poor
surfaces. The forest sections of path need maintenance and access issues with
old bridges, gates could be addressed to improve access. Half of the
forest/moorland sections will be inaccessible without maintenance in 5 years’
time, mainly due to encroaching vegetation. 
3 2  4  2  3  3  3  2  2  1  4  4  5  46.5               
Page 370

Page 371

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP22 2 3 2 2 3 3 3 3 2 3 3 3 2 39.5
Elchies Track - Aberlour              
Speyside              
Route access will always be limited by its hilly terrain. Adding/repairing
waymarkers, assessing dead trees and addressing drainage on muddy sections
would increase accessibility. Convenient path for access to Archiestown area and
campsite outside Archiestown. 
2 3  2  2  3  3  3  3  2  3  3  3  2  39.5               
Page 371

Page 372

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP23 3 3 3 2 3 3 3 2 2 2 3 3 5 44
Glenallachie Path - Aberlour              
Speyside              
The section of this route that runs off road is mostly muddy and overgrown.
About half of this route runs on public roads with steep sections. The steep
terrain will always limit access however maintenance on the off road section will
improve access.  3  3  3  2  3  3  3  2  2  2  3  3  5  44               
Page 372

Page 373

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP24 0 3 1 2 4 3 3 3 2 2 1 0 1 26.5
Birkenbush Road - Glenallachie              
Speyside              
A short path that runs on public roads. The road bridge needs some antislip as
the timber surface is very slippery when wet.  0  3  1  2  4  3  3  3  2  2  1  0  1  26.5               
Page 373

Page 374

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP25 4 3 4 3 2 4 4 2 3 2 5 4 5 54.5
Linn Path - Aberlour              
Speyside               
This path is very popular but needs a lot of work to address its issues. There are
very muddy sections and very uneven sections.  The worst uneven section runs
up past the waterfall and down the other side southwards. There are 3 sets of
steps requiring to be rebuilt as well as some very uneven surfaces. Kissing gates
also create barriers on this route as well as a lack of waymarkers.  Some dead
and damaged trees need further assessment/maintenance. Widening paths and
addressing eroding banks also needs addressed. 
4 3  4  3  2  4  4  2  3  2  5  4  5  54.5               
Page 374

Page 375

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP26 3 3 4 2 3 2 3 2 2 2 4 4 5 47.5
Fairy Knowe Path - Aberlour              
Speyside              
The section that joins from CP-SP23 looks like a private entrance and requires
additional waymarkers.  A narrow gap at the side of a vehicle gate is a barrier
and beyond the houses the route is overgrown and muddy and requires ditches
cleared and drainage. The forest section requires some drainage and resurfacing
but is wide and has no encroaching vegetation. 
3 3  4  2  3  2  3  2  2  2  4  4  5  47.5               
Page 375

Page 376

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP27 1 3 2 2 4 3 3 3 2 2 1 1 1 30
Queens Road Town Link - Aberlour              
Speyside              
This route runs on public road pavements.  There are several raised kerbs as
barriers and tactile paving at road crossing would improve access. Waymarkers
also required on route.  1  3  2  2  4  3  3  3  2  2  1  1  1  30               
Page 376

Page 377

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP28 3 3 1 2 4 4 4 3 2 3 2 1 1 36
Victoria Bridge - Aberlour              
Speyside               
A short path over the Victoria Bridge. The bridge has a set of steps at one side
that limits access. Replacing steps with a ramp would allow bicycles and buggies
access. Cars also park at the steps side that can limit access. The bridge is
showing some corrosion and requires and a full inspection to assess the
condition of the overall bridge.  Anchor cables are also unprotected.   A
fingerpost exists on the Speyside Way near the start of this path includes a finger
for this path, however an addition waymarker next to the bridge would avoid
people missing the fingerpost. 
3 3  1  2  4  4  4  3  2  3  2  1  1  36               
Page 377

Page 378

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP29 1 1 3 1 2 3 2 2 1 3 4 1 2 31.5
Suie to Bridgehaugh Path - Cabrach              
Speyside               
A great scenic route that feels neglected in places. This route has several fords
that limits access. Whole route needs track maintenance in places, many side let
ditches are blocked. Several steep banks along route require barriers for safety.
Sections of path are quite untidy - timber and metal lying at the side of track.
Route in September up to Glenfiddich lodge area has hundreds of pheasants on
track.  Derelict buildings need warning signs and boarding up. 
1 1  3  1  2  3  2  2  1  3  4  1  2  31.5               
Page 378

Page 379

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP30 1 1 2 1 2 3 2 2 1 3 4 1 2 30.5
The Steplar - Cabrach              
Speyside               
Access will always be limited by the hilly terrain and remote location.  There are
a lot of muddy/wet sections due to many side let ditches and cross drains are
blocked. The ford at Black Water crossing and at the Glenlivet end are barriers -
however there is a footbridge nearby to the Glenlivet end crossing. Two short
sections of path around the wind turbine areas seem a bit inefficient as they put
people onto muddy tracks when the good Wind Farm tracks run alongside.
Dangerous buildings require signage at both ends, Moray Council ranger notified
14/10/22. All vehicle tracks require maintenance to prevent washing out and to
maintain drainage. There is a layby about 200m from the end of the route at the
A941 road that often has cars parked. 
1 1  2  1  2  3  2  2  1  3  4  1  2  30.5               
Page 379

Page 380

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP31 2 1 3 1 2 3 2 2 1 1 4 2 5 36.5
Drumin Circular Walk - Glenlivet              
Speyside              
A short, beautiful walk in need of updating and maintenance.  4 gates could
potentially be removed if no longer required. Steps at start of route could be
improved or removed and ramped. Whole path needs pruning, drainage and
path work. When wet this path becomes muddy. Path can flood when river
high.  2  1  3  1  2  3  2  2  1  1  4  2  5  36.5               
Page 380

Page 381

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SP32 2 2 2 1 2 3 2 2 1 1 3 2 4 33
Bochel Circuit - Tomnavoulin              
Spey River Access              
Path access will always be limited by the terrain. However updating and
maintenance required.  The narrow riverside path next to the distillery is a
barrier as well as the narrow bridge. Quick fixes such as replacing the stile with a
gate, adjust gates to open and waymarking would improve the route.  Beyond
the vehicle bridge at the end of the route is a cattle grid with no alternative
access gate. 
2 2  2  1  2  3  2  2  1  1  3  2  4  33               
Page 381

Page 382

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SRA01 2 1 1 1 1 1 1 1 1 1 3 1 2 21.5
Spey River Access - Spey Bay (Tugnet)              
Spey River Access              
Not a defined path to route and no way markers. Steep bank from car park leads
on to short shingle/sand worn path then onto overgrown shingle bank littered
with washed up logs and branches. Shifting shingle limits any path construction
on most of path. 
2 1  1  1  1  1  1  1  1  1  3  1  2  21.5               
Page 382

Page 383

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SRA02 2 1 2 1 2 2 2 2 1 1 3 2 1 26.5
Spey River Access - Fochabers Bank              
Spey River Access              
This path requires waymarkers.  The gate near the main road is a barrier and a
lack of parking limits access. The river side path is uneven and blocked by a
fallen tree. This walk has a few dead trees near the path that requires further
assessment.  2  1  2  1  2  2  2  2  1  1  3  2  1  26.5               
Page 383

Page 384

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SRA03 2 1 3 1 2 2 2 2 1 1 5 2 1 31.5
Spey River Access - Boat o’Brig              
Spey River Access              
Route has better access potential due to the small parking area. However the
muddy paths and narrow sloping riverside paths would need resurfacing. The
Japanese knotweed around the route needs controlling. A bench/picnic table
would be a benefit on this area. 
2 1  3  1  2  2  2  2  1  1  5  2  1  31.5               
Page 384

Page 385

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SRA04 3 3 4 2 3 4 3 3 2 3 2 3 1 40
Spey River Access - Craigellachie West              
Spey River Access              
Very busy area with good 3 car parking areas. With disabled access potential in
the parking areas, path is let down by lack of suitable, consistent path
material/design to allow all ability access to the Speyside Way and Telford
bridge. Multiple paths lead down to the River Spey from Telford bridge car park
which is confusing. 
3 3  4  2  3  4  3  3  2  3  2  3  1  40               
Page 385

Page 386

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SRA05 1 2 1 2 2 2 3 1 2 1 2 1 2 25.5
Spey River Access - Craigellachie East              
Spey River Access              
A popular path with public and fishing, steps and uneven ground. Restricted
access due to the steep bank.  1  2  1  2  2  2  3  1  2  1  2  1  2  25.5               
Page 386

Page 387

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SRA06 1 3 1 2 2 3 3 2 2 2 3 1 2 31.5
Spey River Access - Aberlour Bank              
Spey River Access              
Uneven ground limits access. 1 3 1 2 2 3 3 2 2 2 3 1 2 31.5               
Page 387

Page 388

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SRA07 2 1 2 2 2 3 3 1 2 2 3 2 2 32
Spey River Access - Carron              
Spey River Access              
This route needs waymarkers, it is not the easiest to find.  Steep banks may
require steps and some steep exposed banks need barriers. Very scenic path
limited access by narrow, muddy, bumpy sections. Some tree assessment
required with some very large dead trees. Access is limited by the lack of parking
in this area.  2  1  2  2  2  3  3  1  2  2  3  2  2  32               
Page 388

Page 389

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SRA08 4 2 3 2 3 4 4 2 2 3 4 4 5 50.5
Spey River Access - KnockandoTamdhu              
Spey River Access               
This path has a new route down a ramp, past a toilet block and onto steps. The
route needs maintenance to improve its access. Vegetation
needs cut back, surfaces cleared, steps repaired and also signage and mapboard
repaired/ updated. The steep terrain will always limit access however it should
be all ability to the toilet block but is currently overgrown. 
4 2  3  2  3  4  4  2  2  3  4  4  5  50.5               
Page 389

Page 390

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SRA09 1 1 2 2 3 2 1 2 2 2 5 1 2 32.5
Spey River Access - Blacksboat Bridge              
Spey River Access              
No path here through to riverbank.  Development required. 1 1 2 2 3 2 1 2 2 2 5 1 2 32.5               
Page 390

Page 391

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SRA10 2 2 2 2 3 3 2 2 2 3 5 2 2 39
Spey River Access - Cragganmore              
Spey River Access              
A short fishing path that is accessed via a road with distillery traffic HGV's. The
steep bank will always limit access however adding new steps would reduce the
risk of slipping on the uneven, grassy terrain. 
2 2  2  2  3  3  2  2  2  3  5  2  2  39               
Page 391

Page 392

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SRA11 1 1 1 2 3 3 3 3 2 3 1 0 1 25.5
Spey River Access - Ballindalloch              
Spey River Access              
This route requires signage at the road access point.  Vehicle track requires some
strimming of bracken and drainage on a muddy corner, both are minor and do
not restrict access.  1  1  1  2  3  3  3  3  2  3  1  0  1  25.5               
Page 392

Page 393

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SRA12 1 1 3 2 2 2 2 1 2 2 2 1 2 26.5
Spey River Access - Delnapot (Bridge)              
Speyside Way              
Access to this route is limited due to the steep bank. The steps here are a
barrier. The rest of the route runs on a vehicle track. A fingerpost is required at
the top of the steps and a constructed path at the bottom of the steps. 
1 1  3  2  2  2  2  1  2  2  2  1  2  26.5               
Page 393

Page 394

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SW01 3 3 3 3 3 4 3 3 2 4 3 3 4 47.5
Sp.Way - Buckpool to Spey Bay              
Speyside Way              
A variety of landscapes on this route, very popular with cyclists despite barriers.
The forest section at Spey Bay needs attention to improve access. Old railway
section at Portgordon end has issues around access on the road and from
parking in this area. Portgordon to Buckpool is mostly flatter terrain with
confusing waymarker issues at the Buckpool section. 
3 3  3  3  3  4  3  3  2  4  3  3  4  47.5               
Page 394

Page 395

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SW02 2 3 3 2 3 4 3 3 2 4 3 2 4 44
Sp.Way - Spey Bay to Fochabers              
Speyside Way               
Through Fochabers town the route is good. Some waymarkers and route
confusion at the car park area near the cricket green in Fochabers. The forest
section after the A96 bridge going to Spey Bay has a lot of dead and damaged
trees that need assessment.  Waymarking and resurfacing in this woodland is
also required, some uneven ground. The vehicle tracks to Spey Bay are mostly in
good condition however public vehicles are using the tracks so additional signage
required. The last section of path to the Dolphin Centre could do with drainage
and resurfacing in places as water is sitting and making parts muddy. There are
some patches of Japanese Knotweed along this route in need of attention. 
2 3  3  2  3  4  3  3  2  4  3  2  4  44               
Page 395

Page 396

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SW03 2 2 3 2 3 4 3 3 2 4 3 2 1 38.5
Sp.Way - Fochabers to Craigellachie              
Speyside Way              
Most of this route runs on public roads and vehicle aggregate tracks and are
good quality and have a good level of access. The section of woodland paths
between Ben Aigen and Boat O Brig has a lot of muddy sections and trees that
need attention. The steps at Boat o Brig are in need of repair and road crossing
could do with a roadside path. 
2 2  3  2  3  4  3  3  2  4  3  2  1  38.5               
Page 396

Page 397

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SW04 1 3 1 3 3 4 3 4 3 4 2 1 1 36
Sp.Way - Craigellachie to Cragganmore              
Speyside Way               
This is a long route that has mostly been upgraded recently. There are some
issues. Sections of the path are narrowing due to leaves and grass encroaching,
this will need work to maintain the high quality of the route. There are a few
dead trees next to the path or within falling distance to the path that need
further assessment as well as steep exposed banks that may require barriers.
Between Blacksboat and Aberlour there is a lack of parking areas available
leading to vehicles parking in front or over the path route in places. 
The stone revetment next to the tunnel bridge near Aberlour needs further
inspection due to the degrading of the brickwork as does the exposed rock faces
either side of the tunnel bridge. Bridges between Carron and Craigellachie with
timber surfaces could do with anti-slip grip strips.
Tunnel bridge lighting is not working. 
1 3  1  3  3  4  3  4  3  4  2  1  1  36               
Page 397

Page 398

Moray Core Paths Action Plan 2023-2024
Appendix 2: Core Path Selection Criteria Scorings                            
Row
Labels
Demand/Need 1 Low
- 5 High
Community Linkage 1 Low
- 5 High2
Deliverability 1 Low
- 5 High
Health Benefits 1 Low
- 5 High
Environmental Impact 1 Negative 
- 5 Positive
Econimic/Tourism
Benefits 1 Low
- 5 High
Usage/Popularity 1 Low
- 5 High
Mulit-User Potential 1 Low
- 5 High
Social Inclusion Potential 1 Low
- 5 High
Strategic Importance 1 low
- 5 High
Overall Path Condition 5 Poor - 1 Excellent X 2 Weighting
Best Value 1 Low
- 5 High X 
1.5 Weighting
Accessibility / Development Potential 1 Low
- 5 High X 1.5 Weighting 
Overall Account
CPN-SW05 2 3 3 2 3 4 2 2 2 4 4 3 5 47
Sp.Way - Tomintoul Spur              
Speyside Way              
Access on the route is limited by the steep geography. Maintenance required on
route.
Roadside sections on the A95 and B9008 are less enjoyable, the section
between B9008 and Ballindalloch petrol station is too close the road and
unpleasant to walk on.  Drainage on Deskie hill would improve route.
Maintenance on the new fenced area and roadside path on the Glenlivet side
is required.  Remove all old furniture. 
2 3  3  2  3  4  2  2  2  4  4  3  5  47 
Page 398

Page 399

Moray Core Paths Action Plan 2023-2024 
Appendix 3 - Core Path Selection Prioritisation
Row Labels Area / Town site_code TOTAL SCORE
Spynie Path - Elgin ELGIN CPN-EG33 59.0
NCN Route 1 - Portknockie to Cullen CULLEN CPN-CU02 55.0
Linn Path - Aberlour Speyside CPN-SP25 54.5
The Isla Way - Drummuir Link Isla Way CPN-IW10 54.0
Rathven Burn Path - Buckie Buckie CPN-BK17 53.0
CCP03 – Fairyhills Wood Path ALTYRE CCP03 52.5
NCN Route 1 - Cullen to Lintmill CULLEN CPN-CU03 52.0
The Intak Paths - Fochabers FOCHABERS CPN-FB21 51.0
Tyock Path - Elgin ELGIN CPN-EG39 50.5
The Gownie Path - Aberlour to Dufftown Speyside CPN-SP03 50.5
Findhorn River Path - Forres FORRES CPN-FR09 50.5
Spey River Access - KnockandoTamdhu Spey River Access CPN-SRA08 50.5
The Planting Path - Fochabers FB16 FOCHABERS CPN-FB16 50.5
CCP04 – Loch of Blairs Circular Path ALTYRE CCP04 50.0
Auchoynanie Path - Keith KEITH CPN-KT04 50.0
CCP61 – Seafield Terrace Link Path KEITH CCP61 50.0
Fairfield Avenue Path - Elgin ELGIN CPN-EG35 50.0
Dunnyduff Woodland Paths - Keith KEITH CPN-KT05 49.5
Laird’s Way - Buckie Buckie CPN-BK03 49.5
Rathven Burn Link - Buckie Buckie CPN-BK19 49.5
The Isla Way - Tom Na Muidh Dufftown Isla Way CPN-IW02 49.5
CCP27 – St Aethans Path BURGHEAD CCP27 49.5
Clarkly Hill Path - Burghead LOSSIEMOUTH CPN-LM10 49.5
Spynie Wood Paths - Elgin ELGIN CPN-EG08 49.5
Auchantae Road - Buckie Buckie CPN-BK02 49.5
NCN Route 1 - Broom of Moy to Forres FORRES CPN-FR07 49.5
CCP23 – Califer Hill Path - Rafford RAFFORD CCP23 49.5
Muiryhall Blackburn Route - Lhanbryde ELGIN CPN-EG52 49.0
Lochyhill to Leanchoil Path - Forres FORRES CPN-FR17 49.0
NCN Route 1 - Brumley Brae ELGIN CPN-EG10 49.0
CCP47 – Kingston Road Path GARMOUTH CCP47 49.0
The Isla Way - Jubilee Path Dufftown Isla Way CPN-IW06 49.0
M.Coast Trail - Findochty to Portknockie Moray Coast Trail CPN-MCT18 48.5
Dounie Path - Rothes Speyside CPN-SP12 48.5
Buckie Burn Corridor Path - Buckie Buckie CPN-BK09 48.5
Maister’s Well Path - Dufftown Speyside CPN-SP08 48.5
CCP02 -  Burnie Path DYKE CCP02 48.5
Browlands Path - Garmouth GARMOUTH CPN-FB03 48.5
Maisley Link - Keith KEITH CPN-KT22 48.5
Playing Field Path - Lhanbryde ELGIN CPN-EG58 48.5
High Wood Track - Dyke FORRES CPN-FR05 48.0
Stynie Path - Mosstodloch FOCHABERS CPN-FB12 48.0
CCP30 – Dallas Wood Paths DALLAS CCP30 48.0
CCP51 – Slackend Path PORTGORDON CCP51 48.0
College of Roseisle Path - Roseisle LOSSIEMOUTH CPN-LM01 48.0
M.Coast Trail - Clashach to Covesea Moray Coast Trail CPN-MCT08 47.5
Fairy Knowe Path - Aberlour Speyside CPN-SP26 47.5
Page 399

Page 400

Moray Core Paths Action Plan 2023-2024 
Appendix 3 - Core Path Selection Prioritisation
Old Railway Path - Elgin ELGIN CPN-EG06 47.5
Sp.Way - Buckpool to Spey Bay Speyside Way CPN-SW01 47.5
Webster Way - Mosstodloch FOCHABERS CPN-FB13 47.0
CCP46 – Millbuies Paths FOGWATT CCP46 47.0
Sp.Way - Tomintoul Spur Speyside Way CPN-SW05 47.0
Green Roadies Path - Keith KEITH CPN-KT07 46.5
Short Forest Circular Path - Archiestown Speyside CPN-SP21 46.5
Clarkly Hill Coastal Link - Cummingston LOSSIEMOUTH CPN-LM12 46.5
Duffus Road to Brumley Brae Link - Elgin ELGIN CPN-EG09 46.5
Slorachs Loop - Fochabers FOCHABERS CPN-FB17 46.5
Greshop Path - Forres FORRES CPN-FR08 46.5
Stynie Wood Path - Mosstodloch FOCHABERS CPN-FB11 46.5
Clovenside Path - Forres FORRES CPN-FR18 46.5
Glenfiddich Way - Dufftown Speyside CPN-SP02 46.0
Crooked Wood Paths - Lhanbryde ELGIN CPN-EG55 46.0
Old Station Yard Path - Buckie Buckie CPN-BK14 46.0
Innes Lane Path - Garmouth GARMOUTH CPN-FB04 46.0
M.Coast Trail - Kingston to Garmouth Moray Coast Trail CPN-MCT12 46.0
Quarrel Wood Paths - Elgin ELGIN CPN-EG04 46.0
Loanie Road - Dyke FORRES CPN-FR04 46.0
Old Mills Path - Elgin ELGIN CPN-EG16 45.5
CCP53 – Reservoir Path PORTKNOCKIE CCP53 45.5
The Walkies - Forres FORRES CPN-FR14 45.5
The Isla Way - Convalmore Link Dufftown Isla Way CPN-IW05 45.0
Gordon’s Cross Path - Dufftown Speyside CPN-SP07 45.0
Gollachy Burn Path - Buckie Buckie CPN-BK01 45.0
Crannoch Circular Path - Cullen CULLEN CPN-CU05 45.0
Giant’s Chair Path - Dufftown Speyside CPN-SP06 45.0
Rothes Castle Paths Speyside CPN-SP13 45.0
Outer Edge Path - Elgin ELGIN CPN-EG31 45.0
Meg’s Wood Path - Dufftown Speyside CPN-SP11 45.0
The Isla Way - Dufftown Station Path Isla Way CPN-IW04 44.5
CCP29 – Miltonduff Wood Paths MILTONDUFF CCP29 44.5
Forres Academy Safe Routes FORRES CPN-FR32 44.5
Braehead Right of Way - Keith KEITH CPN-KT13 44.5
CCP60 – Maisley Road KEITH CCP60 44.5
Sp.Way - Spey Bay to Fochabers Speyside Way CPN-SW02 44.0
CCP58 – Moss of Rothiemay Path ROTHIEMAY CCP58 44.0
Glenallachie Path - Aberlour Speyside CPN-SP23 44.0
Pickylaw Path - Hopeman LOSSIEMOUTH CPN-LM18 44.0
High School Path - Lossiemouth LOSSIEMOUTH CPN-LM24 44.0
Old Railway Path to Cemetery - Lossiemouth LOSSIEMOUTH CPN-LM27 43.5
Morriston Path - Elgin ELGIN CPN-EG15 43.5
Mannachie Paths - Forres FORRES CPN-FR22 43.5
Fishwives Road - Newmill to Drybridge Isla Way CPN-KT01 43.5
NCN Route 1 - Spey Viaduct East GARMOUTH CPN-FB07 43.5
CCP07 – New Forres Link FORRES CCP07 43.5
CCP67 – Wood of Aberlour Path ABERLOUR CCP67 43.0
Page 400

Page 401

Moray Core Paths Action Plan 2023-2024 
Appendix 3 - Core Path Selection Prioritisation
CCP39 – Institution Path ELGIN CCP39 43.0
The Isla Way - Loch Park Link Drummuir Isla Way CPN-IW09 43.0
Forres Enterprise Park CycleTrack FORRES CPN-FR16 43.0
Pressley Path - Logie FORRES CPN-FR43 43.0
The Isla Way - Cachenhead Path Drummuir Isla Way CPN-IW11 43.0
Buckie High School Safe Routes Buckie CPN-BK10 43.0
CCP33 – Ladyhill Path ELGIN CCP33 42.5
Essil Road and The Glebe - Mosstodloch FOCHABERS CPN-FB10 42.5
Fairway Path - Elgin ELGIN CPN-EG05 42.5
Kintessack to Broom of Moy Right of Way FORRES CPN-FR06 42.5
CCP56 – Littlehill Circular Path NEWMILL CCP56 42.5
Den Path - Keith KEITH CPN-KT06 42.0
NCN Route 1 - Buckpool to Findochty Buckie CPN-BK04 41.5
Birkenhill Wood Paths - Elgin ELGIN CPN-EG07 41.5
NCN Route 1 - Spey Viaduct West GARMOUTH CPN-FB06 41.5
CCP08 – Pilmuir West Flood Path FORRES CCP08 41.5
Old Railway Path - Rothes Speyside CPN-SP18 41.5
Hopeman East Path LOSSIEMOUTH CPN-LM17 41.5
CCP37 – Lesmurdie Link Path ELGIN CCP37 41.5
M.Coast Trail -Old Coastal R'way Hopeman Moray Coast Trail CPN-MCT05 41.5
CCP64 – Dallachy Link Path DALLACHY CCP64 41.5
Deanshaugh Path - Elgin ELGIN CPN-EG25 41.0
CCP52 – Clochan Right of Way CLOCHAN CCP52 41.0
Muiry Wood Paths - Forres FORRES CPN-FR19 41.0
Hardhillock Path - Elgin ELGIN CPN-EG36 41.0
CCP22 – Granary Loop Track - Rafford RAFFORD CCP22 40.5
Dava Way - Mannachie Section Dava Way CPN-DA01 40.5
Gordon Baxter Way - Mosstodloch FOCHABERS CPN-FB09 40.0
Spey River Access - Craigellachie West Spey River Access CPN-SRA04 40.0
Golf Course Path - Elgin ELGIN CPN-EG43 40.0
Lossie to Elgin Cycle Way ELGIN CPN-EG03 40.0
Mill of Buckie Path - Buckie Buckie CPN-BK08 40.0
M.Coast Trail - Hopeman Bay Moray Coast Trail CPN-MCT07 40.0
Chapleton Track - Forres FORRES CPN-FR20 40.0
M.Coast Trail - Portgordon Old Railway Moray Coast Trail CPN-MCT14 40.0
Moray Golf Course path - Lossiemouth LOSSIEMOUTH CPN-LM20 39.5
Elchies Track - Aberlour Speyside CPN-SP22 39.5
Lossie to Elgin Cycle Route LOSSIEMOUTH CPN-LM19 39.5
CCP63 – Rothes Old Railway Path ROTHES CCP63 39.5
M.Coast Trail - Findhorn Beach Link Moray Coast Trail CPN-MCT01 39.5
Portessie Railway Path Buckie CPN-BK18 39.0
Greshop to Mundole Path - Forres FORRES CPN-FR10 39.0
Cliff Terrace Paths - Buckie Buckie CPN-BK15 39.0
Spey River Access - Cragganmore Spey River Access CPN-SRA10 39.0
Cottage Wood Path - Keith KEITH CPN-KT19 39.0
Cluny Path - Forres FORRES CPN-FR37 39.0
Cullen Coastal Path CULLEN CPN-CU06 39.0
Millbank Primary Sch Safe Routes -Buckie Buckie CPN-BK11 39.0
Page 401

Page 402

Moray Core Paths Action Plan 2023-2024 
Appendix 3 - Core Path Selection Prioritisation
The Isla Way - Tininver Dufftown Isla Way CPN-IW01 38.5
Sp.Way - Fochabers to Craigellachie Speyside Way CPN-SW03 38.5
Duffus to Coast Route LOSSIEMOUTH CPN-LM05 38.5
M.Coast Trail - Lossiemouth Moray Coast Trail CPN-MCT10 38.5
Dava Way - Drumine Section Dava Way CPN-DA03 38.5
Inverugie to Duffus Road Track - Duffus LOSSIEMOUTH CPN-LM02 38.5
Lhanbryde Safe Route ELGIN CPN-EG57 38.5
Tytler Street Path - Forres FORRES CPN-FR30 38.5
Cluny Path - Buckie Buckie CPN-BK13 38.0
The Isla Way Balvenie Public Road Duffto Isla Way CPN-IW03 38.0
The Isla Way Kininvie Wood Road Drummuir Isla Way CPN-IW08 38.0
M.Coast Trail - Findhorn Dunes Moray Coast Trail CPN-MCT02 38.0
Covesea Path - Lossiemouth LOSSIEMOUTH CPN-LM08 38.0
Kirkhillhead Path - Lhanbryde ELGIN CPN-EG56 37.5
Seaview Road path - Buckie Buckie CPN-BK05 37.5
M.Coast Trail - Spey Viaduct Link Moray Coast Trail CPN-MCT13 37.5
CCP70 – Balloch Moss Path CABRACH CCP70 37.5
Dava Way - Romach Section Dava Way CPN-DA02 37.5
Dava Way - Longley Section Dava Way CPN-DA04 37.5
CCP11 – Pilmuir Cycle Path FORRES CCP11 37.0
Steepie Brae Path - Dufftown Speyside CPN-SP10 37.0
Mosstodloch to Fochabers Cycle Route FOCHABERS CPN-FB08 37.0
Dava Way - Dunphail to Dava Section Dava Way CPN-DA05 37.0
CCP15 – Mosset Flood Track FORRES CCP15 37.0
CCP65 – Knockando School Path KNOCKANDO CCP65 37.0
Loch Na Bo Woodland Path - Lhanbryde ELGIN CPN-EG53 37.0
Balloch Wood Path - Keith KEITH CPN-KT03 37.0
Bogmoor Link - Dallachy FOCHABERS CPN-FB24 37.0
M.Coast Trail - Portessie Bay Moray Coast Trail CPN-MCT15 37.0
Lower Mannoch Path - Knockando Speyside CPN-SP20 37.0
Lony Park Paths - Keith KEITH CPN-KT10 37.0
Drumin Circular Walk - Glenlivet Speyside CPN-SP31 36.5
Horse Market Lea Path - Keith KEITH CPN-KT11 36.5
Cemetery Path - Buckie Buckie CPN-BK06 36.5
M.Coast Trail - Findochty Moray Coast Trail CPN-MCT17 36.5
Den Track - Fochabers FOCHABERS CPN-FB15 36.5
CCP49 – Leitch’s Wood Link Path FOCHABERS CCP49 36.5
Keith Old Cemetery Path KEITH CPN-KT18 36.5
CCP38 – Mayne Road Link ELGIN CCP38 36.5
Forres Town Centre Link FORRES CPN-FR42 36.5
M.Coast Trail - Silver Sands Lossiemouth Moray Coast Trail CPN-MCT09 36.5
Victoria Bridge - Aberlour Speyside CPN-SP28 36.0
Thornhill Residential Path - Forres FORRES CPN-FR29 36.0
The Wards Paths - Elgin ELGIN CPN-EG37 36.0
Bishopmill School Path/LadiesWalk -Elgin ELGIN CPN-EG13 36.0
Toll House and Braehead Road - Keith KEITH CPN-KT21 36.0
CCP59 – Meikle Balloch Hill Paths KEITH CCP59 36.0
CCP36 – Elgin/Lhanbryde Cycle Path ELGIN/LHANBRYDE CCP36 36.0
Page 402

Page 403

Moray Core Paths Action Plan 2023-2024 
Appendix 3 - Core Path Selection Prioritisation
Brandy Brae Path - Keith KEITH CPN-KT17 36.0
Sp.Way - Craigellachie to Cragganmore Speyside Way CPN-SW04 36.0
CCP72 – The Roch Ford CABRACH CCP72 35.5
Forres to Findhorn Cycle Route (North) Findhorn CPN-FR25 35.5
CCP21 – Woodside Track - Rafford RAFFORD CCP21 35.5
Glenrinnes Way-Dufftown Speyside CPN-SP04 35.5
Burghead Woodland Route LOSSIEMOUTH CPN-LM09 35.5
M.Coast Trail - Cullen Bay Speyside CPN-MCT20 35.5
Grant Park Path - Forres FORRES CPN-FR38 35.0
Thornhill Park Paths - Forres FORRES CPN-FR23 35.0
Foundation Path - Findhorn Findhorn CPN-FR27 35.0
Drummuir Station Path-Drummuir Drummuir CPN-KT23 34.5
CCP05 – Lochyhill  Path FORRES CCP05 34.5
Barhill Road Path - Buckie Buckie CPN-BK07 34.5
Hythehill/Lossie High School Safe Routes LOSSIEMOUTH CPN-LM22 34.5
Clarkly Hill Cummingston Link LOSSIEMOUTH CPN-LM11 34.5
CCP25 - Blervie Wood Path - Rafford RAFFORD CCP25 34.5
M.Coast Trail - Burghead Moray Coast Trail CPN-MCT04 34.5
Forres to Findhorn Cycle Route (South) FORRES CPN-FR15 34.5
CCP09 – Pilmuir Link Path FORRES CCP09 34.5
CCP41 – New Elgin Link ELGIN CCP41 34.5
CCP17 – Greshop to Station Link FORRES CCP17 34.5
Football Ground Path - Lossiemouth LOSSIEMOUTH CPN-LM26 34.5
M.Coast Trail - Roseisle Section Moray Coast Trail CPN-MCT03 34.0
M.Coast Trail - Strathlene to Findochty Moray Coast Trail CPN-MCT16 34.0
CCP73 – Ben Rinnes Hill Path GLENRINNES CCP73 34.0
Drummuir Street - Hopeman LOSSIEMOUTH CPN-LM13 34.0
Duffus Road Path - Elgin ELGIN CPN-EG12 34.0
Lang Walk - Elgin ELGIN CPN-EG11 34.0
CCP66 – Woolfies Brae ABERLOUR CCP66 34.0
Greenwards/Elgin High School Safe Route ELGIN CPN-EG42 34.0
Linkwood Path - Elgin ELGIN CPN-EG46 34.0
Buckie High Street Buckie CPN-BK21 34.0
Breakback Path - Forres FORRES CPN-FR34 33.5
M.Coast Trail - Hopeman Caravan Park Moray Coast Trail CPN-MCT06 33.5
Boroughbriggs Cycle Link - Elgin ELGIN CPN-EG17 33.5
Fife Park Path - Keith KEITH CPN-KT20 33.5
Dufftown Town Centre Link Speyside CPN-SP09 33.0
Springfield Link - Elgin ELGIN CPN-EG41 33.0
CCP18 – Waterford Cycle Link FORRES CCP18 33.0
CCP54 – Balnacoul Link Path MOSSTODLOCH CCP54 33.0
Bochel Circuit - Tomnavoulin Spey River Access CPN-SP32 33.0
Harbour Street - Hopeman LOSSIEMOUTH CPN-LM14 33.0
Hill 99 Trail - Culbin FORRES CPN-FR03 33.0
Cuthil Seafield Link - Keith KEITH CPN-KT16 33.0
Hopeman to Duffus Cycle Link LOSSIEMOUTH CPN-LM03 33.0
St Leonard’s Path - Forres FORRES CPN-FR36 32.5
Thornhill Cycle Path - Elgin ELGIN CPN-EG45 32.5
Page 403

Page 404

Moray Core Paths Action Plan 2023-2024 
Appendix 3 - Core Path Selection Prioritisation
Greshop Route - Forres FORRES CPN-FR12 32.5
Bronte Path - Forres FORRES CPN-FR39 32.5
Spynie Canal Path - Lossiemouth LOSSIEMOUTH CPN-LM28 32.5
Boyd Anderson Community Path Lossiemouth LOSSIEMOUTH CPN-LM23 32.5
M.Coast Trail - Lossiemouth Kingston Moray Coast Trail CPN-MCT11 32.5
Bishopmill Path - Elgin ELGIN CPN-EG28 32.5
Milnes School Safe Route - Fochabers FOCHABERS CPN-FB19 32.5
Garrowood Path - Grange KEITH CPN-KT02 32.5
Nelson Point Path - Cullen CULLEN CPN-CU08 32.5
Spey River Access - Blacksboat Bridge Spey River Access CPN-SRA09 32.5
Cooper Park Paths - Elgin ELGIN CPN-EG23 32.0
Ashgrove Path - Elgin ELGIN CPN-EG48 32.0
Ramflat Road Path - Forres FORRES CPN-FR28 32.0
CCP10 – Pilmuir Road West FORRES CCP10 32.0
Mosset Burn Corridor Path - Forres FORRES CPN-FR31 32.0
M.Coast Trail - Portknockie Moray Coast Trail CPN-MCT19 32.0
Spey River Access - Carron Spey River Access CPN-SRA07 32.0
Elgin Town Centre Pedestrian Precincts ELGIN CPN-EG18 31.5
Roysvale Path - Forres FORRES CPN-FR33 31.5
Suie to Bridgehaugh Path - Cabrach Speyside CPN-SP29 31.5
CCP26 – Tarryblake Path ROTHIEMAY CCP26 31.5
Spey River Access - Boat o’Brig Spey River Access CPN-SRA03 31.5
Spey River Access - Aberlour Bank Spey River Access CPN-SRA06 31.5
NCN Route 1 - Deanshaugh - Elgin ELGIN CPN-EG26 31.5
Burn of Rothes/Mannoch Road - Rothes Speyside CPN-SP01 31.5
High Street Link - Rothes Speyside CPN-SP14 31.5
CCP62 – Maltkiln Burn Path DUFFTOWN CCP62 31.5
Sanquhar Loch Circular Path - Forres FORRES CPN-FR35 31.0
Highland Yards Estate Route - Buckie Buckie CPN-BK16 31.0
Cathedral and Brewery Bridge Link -Elgin ELGIN CPN-EG24 31.0
CCP55 – Seafield Farm Track CULLEN CCP55 31.0
NCN Route 1 - Findochty Buckie CPN-BK20 31.0
CCP06 – Enterprise Park Circular Path FORRES CCP06 31.0
Maggot Cycle Path - Elgin ELGIN CPN-EG59 31.0
River Spey Path - Rothes Speyside CPN-SP17 31.0
Miltonduff School Safe Route ELGIN CPN-EG01 31.0
Beach Road - Findhorn Findhorn CPN-FR26 31.0
Woodside Path - Forres FORRES CPN-FR21 31.0
New Elgin Primary Safe Routes ELGIN CPN-EG47 31.0
CCP48 – Loch Oire A96 Cycle Path MOSSTODLOCH CCP48 31.0
The Isla Way - Tulloch Road Dufftown Isla Way CPN-IW07 31.0
The Steplar - Cabrach Speyside CPN-SP30 30.5
Town Centre Link - Keith KEITH CPN-KT08 30.5
Salmon Bothy Path - Cullen CULLEN CPN-CU09 30.5
Lossie Wynd - Elgin ELGIN CPN-EG21 30.5
CCP45 – Linkwood Road Cycle Path ELGIN CCP45 30.5
High Street to Cooper Park Link - Elgin ELGIN CPN-EG22 30.5
Elgin High Street ELGIN CPN-EG20 30.5
Page 404

Page 405

Moray Core Paths Action Plan 2023-2024 
Appendix 3 - Core Path Selection Prioritisation
CCP31 – Hopeman School Brae Path HOPEMAN CCP31 30.5
Thunderton Place - Elgin ELGIN CPN-EG19 30.5
Southfield Path - Elgin ELGIN CPN-EG60 30.0
Station Road Route - Garmouth GARMOUTH CPN-FB05 30.0
CCP01 – Brodie Castle Trail BRODIE CCP01 30.0
CCP16 – Ferrylea Cycle Link FORRES CCP16 30.0
Queens Road Town Link - Aberlour Speyside CPN-SP27 30.0
Freuchny Stripe - Buckie Buckie CPN-BK12 30.0
Cuthil Park Paths - Keith KEITH CPN-KT15 30.0
Plewlands Coastal Link - Covesea LOSSIEMOUTH CPN-LM07 29.5
Lesmurdie Road Cycle Path - Elgin ELGIN CPN-EG29 29.5
Seaview Path - Cullen CULLEN CPN-CU07 29.0
Hopeman Primary School Cycle Link LOSSIEMOUTH CPN-LM16 29.0
CCP43 – Southfield Cycle Path ELGIN CCP43 29.0
Dr Gray’s Link - Elgin ELGIN CPN-EG14 29.0
Lintmill to Crannoch Road CULLEN CPN-CU04 29.0
Torrieston Walks All Abilities trail ELGIN CPN-EG02 29.0
Bilbohall Farm Link - Elgin ELGIN CPN-EG34 29.0
Ramsay Lane Link - Lossiemouth LOSSIEMOUTH CPN-LM25 28.5
Westerton Path - Drummuir Drummuir CPN-KT24 28.5
Fochabers High Street FOCHABERS CPN-FB18 28.5
Pinefield Playing Field Path - Elgin ELGIN CPN-EG49 28.5
NCN Route 1 - Forres to Kinloss FORRES CPN-FR13 28.5
CCP34 – Hamilton Gardens Cycle Path ELGIN CCP34 28.5
NCN Route 1- Admiralty St Path - Pknocki CULLEN CPN-CU01 28.5
CCP13 – Grantown Road Cycle Path FORRES CCP13 28.5
Cloddymoss Culbin Track - Dyke FORRES CPN-FR01 28.0
Grant Park Central Path - Forres FORRES CPN-FR40 28.0
CCP44 – Linkwood Cycle Path ELGIN CCP44 27.5
Rothes Primary School Safe Route Speyside CPN-SP15 27.5
Rafford Road Route - Rafford FORRES CPN-FR24 27.5
NCN Route 1 - Innes Road GARMOUTH CPN-FB02 27.5
CCP40 – Dovecot Cycle Path ELGIN CCP40 27.5
Linksfield Path - Elgin ELGIN CPN-EG27 27.5
Wards Back Path - Elgin ELGIN CPN-EG38 27.5
Drum Road Path - Keith KEITH CPN-KT09 27.0
Seafield Park Road/Land Street - Keith KEITH CPN-KT14 27.0
Lodge Path - Forres FORRES CPN-FR41 27.0
CCP71 – Blackwater Track CABRACH CCP71 27.0
Spey River Access - Fochabers Bank Spey River Access CPN-SRA02 26.5
Birkenbush Road - Glenallachie Speyside CPN-SP24 26.5
Glass Green Path - Elgin ELGIN CPN-EG44 26.5
Spey River Access - Delnapot (Bridge) Speyside Way CPN-SRA12 26.5
Spynie Cycle Link - Elgin ELGIN CPN-EG30 26.5
Edgar Road Path - Elgin ELGIN CPN-EG40 26.5
CCP42 – Birnie Road Cycle Path ELGIN CCP42 26.5
Tamdhu Road - Knockando Speyside CPN-SP19 26.5
CCP14 – Kinloss Wetlands Path KINLOSS CCP14 26.5
Page 405

Page 406

Moray Core Paths Action Plan 2023-2024 
Appendix 3 - Core Path Selection Prioritisation
Burn Brae - Dufftown Speyside CPN-SP05 26.0
Hopeman Inverugie Path LOSSIEMOUTH CPN-LM15 26.0
Drainie Way - Lossiemouth LOSSIEMOUTH CPN-LM21 26.0
Home Farm Track - Fochabers FOCHABERS CPN-FB14 26.0
CCP12 - Knockomie Link FORRES CCP12 25.5
CCP32 – Sunbank Cycle Path LOSSIEMOUTH CCP32 25.5
Spey River Access - Craigellachie East Spey River Access CPN-SRA05 25.5
Spey River Access - Ballindalloch Spey River Access CPN-SRA11 25.5
Green Street - Rothes Speyside CPN-SP16 25.5
CCP35 – Spynie Cycle Link ELGIN CCP35 25.5
Hidden History to Cloddymoss Track -Dyke FORRES CPN-FR02 25.0
Duffus Hall Path LOSSIEMOUTH CPN-LM04 25.0
A96 Pavement - Forres FORRES CPN-FR11 25.0
Duffus Green Roadie LOSSIEMOUTH CPN-LM06 25.0
Cadgers Road - Garmouth GARMOUTH CPN-FB01 24.5
CCP28 – Carsehill Path ALVES CCP28 24.5
George Street Route - Fochabers FOCHABERS CPN-FB20 24.5
Denwell Road - Keith KEITH CPN-KT12 24.0
Darkland Road Route - Lhanbryde ELGIN CPN-EG54 23.5
Urquhart Road Route - Lhanbryde ELGIN CPN-EG51 23.5
Waulkmill Grove Path - Elgin ELGIN CPN-EG50 23.5
CCP69 – Little Balloch Path CABRACH CCP69 22.5
Spey River Access - Spey Bay (Tugnet) Spey River Access CPN-SRA01 21.5 
Page 406

Page 407

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 20 JUNE 2023 
SUBJECT: A940 GRANTOWN ROAD, FORRES TRAFFIC REGULATION
ORDER FOR EXTENSION AND AMENDMENT OF SPEED LIMIT 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To ask the Committee to consider an objection to the proposed Traffic
Regulation Order: 
“Moray Council (A940 Grantown Road, Forres – Proposed 40 / 30mph Speed
Limit) Order 2022” 
1.2 This report is submitted to Committee in terms of Section III (F) (17) and (20)
of the Council's Scheme of Administration relating to traffic management
functions including the preparation and implementation of traffic management
and the making of Order for the regulation and management of traffic. 
2. RECOMMENDATION 
2.1 It is recommended that Committee: 
(i) considers and over-rules the outstanding objection outlined in
Appendix 3 and approves the Traffic Regulation Order; and 
(ii) authorises the Head of Environmental and Commercial Services
and the Legal Services Manager to make the undernoted Order: 
“Moray Council (A940 Grantown Road, Forres – Proposed 40 /
30mph Speed Limit) Order 2022” 
3. BACKGROUND 
3.1 The A940 Grantown Road corridor has been the major area for housing
growth in Forres for the past 30 years. The majority of the development sites
on this corridor have been completed. As development has progressed the
30mph speed limit on the A940 has been extended and is currently located
approximately 90 metres to the south of the A940/Falconer Avenue/Whiterow
Drive roundabout.
Item 6
Page 407

Page 408

3.2 The final designated housing development site on the A940 corridor in the
Moray Local Development Plan 2020, R1 Knockomie, is now under
construction. This 112-house development is served by a new access onto
the A940 Grantown Road, which was subject to a Stage 1/2 Road Safety
Audit. The Road Safety Audit recommended that a 40mph speed limit be
introduced on the A940 frontage of the R1 Knockomie development. This
recommended speed limit is in keeping with the guidance set out in the
Scottish Government document ‘Setting Local Speed Limits’. 
3.3 The roadside environment is taken into account when determining the
start/end of a speed limit. Where there are higher levels of activity, associated
with driveways for individual properties, footways/cycle paths adjacent to the
carriageway etc, drivers will lower their speeds as they anticipate interaction
with other road users. However, for roads where pedestrian routes are away
from the carriageway and houses have high garden fences fronting onto the
road, then drivers do not anticipate interaction with other road users and
vehicle speeds increase. 
3.4 In line with the Scheme of Delegation, with approval of the Chair, Deputy
Chair and relevant Ward Members, officers within Transportation and Legal
Teams undertook the statutory process for the promotion of the Road Traffic
Regulation Order to introduce a new section of 40 mph speed limit and to
increase a short section of the existing 30 mph speed limit to 40mph. The
reason for the latter is compliance with the national guidelines, which are for a
minimum required length of 400 metres. 
3.5 The proposed speed limits are detailed in APPENDIX 1 whereas APPENDIX
2 provides a Plan showing the proposed extent of both the new 40mph and
the revised 30 mph speed limit 
3.6 The consultation process highlighted concern from one local resident. The
objection was received during the statutory consultation period as the objector
attended a meeting of the Forres Community Council where the proposed
speed limit was discussed. However, officers agreed to accept the objection at
that stage and entered into a dialogue with the objector to seek to address
their concerns. 
3.7 There has been extensive dialogue with the objector, both before and during
the public consultation, and officers have provided full responses to the
concerns raised. This report therefore brings forward that objection for
consideration by Committee, in line with the process for determining Traffic
Regulation Orders, whereby unresolved objections must be brought to
Committee where officers recommend that the proposed Traffic Regulation
Order should be confirmed. 
3.8 A summary of the objector’s concerns and officer’s response are detailed in
APPENDIX 3. Officers are recommending the objection is over ruled and the
speed limits confirmed as acceptable and self-enforcing, in keeping with the
guidance in the Scottish Government document Setting Local Speed Limits. A
full copy of the objection has been circulated to Members of the Committee
and any relevant Ward Members not on the Committee prior to the meeting.
Page 408

Page 409

4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The report encompasses the main aims of the Economic Development
programme by maintaining suitable transport facilities and infrastructure
as designated for their intended use. The speed limit will contribute to
improving Safety on the A940 Grantown Road and to help to grow a
diverse and sustainable community, which is a priority in the 10 year
plan. 
(b) Policy and Legal
The proposal complies with the requirements in the Road Traffic
Regulation Act 1984 and the Local Authorities’ Traffic Orders
(Procedures) (Scotland) Regulations 1999. 
(c) Financial implications
The total cost of promoting the Traffic Regulation Order and providing
the associated road signs will be approximately £2,000 and will be met
by a contribution from the developer of the R1 Knockomie site, who will
also be responsible for the costs associated with the works to implement
the proposed speed limit. 
(d) Risk Implications
The 40mph speed limit will reduce the approach speeds into Forres from
the south and will provide greater compliance with the revised 30mph
restriction. If the 40mph speed limit is not introduced then the recently
constructed development access at the R1 Knockomie site will not
comply with visibility standards and may introduce a road safety risk. 
If a 30mph speed limit is introduced along the frontage of the R1
Knockomie site then as a consequence of the lack of development and
activity close to the A940, lower levels of compliance will be likely with an
increased risk of accidents. It will also be more likely that there will be
non-compliance within the existing 30mph speed limit on the northern
section of Grantown Road. 
(e) Staffing Implications
There are no staffing implications arising from this report. 
(f) Property
There are no property implications arising from this report. 
(g) Equalities/Socio Economic Impact
The proposal to introduce a lower speed limit on the R1 site frontage will
reduce or maintain reduced vehicular speeds and will encourage greater
use of the local roads by non-motor vehicle road users. The speed
restrictions will have a positive impact on families with children, disabled
people and the elderly. 
Page 409

Page 410

(h) Climate Change and Biodiversity Impacts
When vehicle speeds of around 40mph are reduced to lower speeds,
vehicle emissions (CO2 and NOx) increase.  Whereas when vehicle
speeds which around 50-60 mph are reduced to around 40mph, vehicle
emissions reduce (Department for Transport Speed Limit Appraisal Tool:
User Guidance). 
The proposed changes to the speed limit on the A940 Grantown Road
are to reduce the speed limit from 60 mph to 40mph along a distance of
165 metres or thereby and to increase the speed limit from 30mph to
40mph along a distance of 277 metres or thereby. These particular
changes would result in vehicle speeds being around 40mph and
therefore be likely to lead to a reduction in vehicle emissions along the
section of road covered by the proposed speed limit changes. 
(i) Consultations
The Depute Chief Executive (Economy, Environment and Finance),
Head of Environmental and Commercial Services; Chief Financial
Officer, Legal Services Manager, Equal Opportunities Officer, Climate
Change Strategy Officer, Committee Services Officer (L Rowan) and L
Morrison, Police Scotland, have been consulted and any comments
taken into consideration. 
The relevant Ward Members have been advised of the proposals and
any comments that they have may be tabled at the meeting. 
5. CONCLUSION 
5.1 It is recommended that the Committee over-rule the outstanding
objection received approve the Road Traffic Regulation Order as
detailed within “Moray Council (A940 Grantown Road, Forres –
Proposed 40 / 30mph Speed Limit) Order 2022” and authorises the Head
of Environmental and Commercial Services and the Legal Services
Manager to make the Order. 
Author of Report: Diane Anderson, Senior Engineer Transportation 
Background Papers: 
Ref: SPMAN-524642768-903 
Page 410

Page 411

The Moray Council (A940 Grantown Road, Forres – Proposed 40 / 30mph
Speed Limit) Order 2022 
SCHEDULE 1
Location 
A940 Forres
to Grantown
Road
Description 
From the point where it meets the A96(T) Forres Bypass, in a
southerly direction along Market Street, St Catherine’s Road and
Grantown Road, to a point 230metres or thereby south of the
projected south kerbline of Balnageith Road. 
Grantown Road from a point 230metres or thereby south of the
projected south kerbline of Balnageith Road to a point 22m or
thereby south of the projected south kerbline of Webster Drive.
Restriction 
30mph 
40mph 
STATEMENT OF REASONS
The general effect will be to introduce a 40mph speed limit buffer for vehicles entering
Forres and amend the existing 30mph speed limit in line with current Guidelines and
as specified in Schedule 1. 
Following the approval of the Planning Application (19/00293 APP) submitted to Moray
Council to build 112 residential on Site R1 as identified in the 2020 Local Plan off
Grantown Road, Forres, a number of conditions were placed upon the applicants. This
included a requirement for a Stage 1/2 Road Safety Audit. 
The Road Safety Audit identified a “risk of increase in severity of collision” on the A940
and recommended a 40mph speed limit to cover the development junction with the
A940. This proposal is to introduce a 40mph speed limit to protect the development
access and extend the 40mph limit into Forres to an appropriate location for a
transition to 30mph. This amendment is in accordance with the procedure for
reviewing speed limits agreed at the Economic Development and Infrastructure
Services Committee on 13 October 2009 and in the interests of Road Safety. 
Item 6
Page 411

Page 412

Page 412

Page 413

16
Knockomie Lodge
21
10
LB
1
Play Area
CINCHONA ROAD
25
13
19
24
12
5
14
12a
8
19
2
20
16
10
2
1
1
4
15
6
ESS
KENSALL GREEN
RHODODENDRON DRIVE
1
35
31
2
2
43
3
41 37
39
16
7
1
13
213
CAUTLEY CLOSE
27
9
8
1
1
11
7
7
2
17
Balancing Pond
2
7
8
19
5
1
1
DARWIN DRIVE
MACRAE COURT
HUGH ROAD
FALCONER AVENUE
Posts
5
1
Play Area
BRANDER GARDENS
RIDDOCK GARDENS
5
6
33
9
13
11
25
29 15
19
1
1
10
2
CUMISKIE CRESCENT
WHITEROW DRIVE
17
13
11
21 to 27
57
31
72
70
Tanera
A 940
28.4m
19.4m
32.3m
30.1m
7
ESS
Old Military Road
33 to 39
GRANTOWN ROAD
85
87
91
6359
57
55
29
61
93
49
37
99
105
95
127125
91
2
20
24
141
56
16
79
50
38
46
13 to 19
52
88
32
67
143
30
87
20
48
14
1
11
18
12
119
25
5
17
81
14
2
70
1
87
Ferryview
BALNAFERRY FARM LANE
18.5m
12
14 10
8
18
20
22
12
129
49 to 55
BALNAGEITH RISE
41 to 47
Play Area
74
4
23
1
KNOCKOMIE RISE
13
11 15
8
62
68
133
86
78
KNOCKOMIE GARDENS
16
5
Cottages
Balancing Pond
19
443.25m
22.02m
97.43m
Existing 30mph
Proposed 40mph
Currently 30mph
Proposed 40mph
Currently 60mph
Existing 60mph
Grantown Road
FORRES
NJ0357
Unauthorised reproduction infringes Crown copyright
the permission of the Controller of 
and may lead to prosecution or civil proceedings.
Her Majesty's Stationery Office.
Reproduced from the Ordnance Survey map with
Crown Copyright.                Licence No 100023422
MORAY COUNCIL
DRAWING NO.
AMENDMENTSREV
SCALES:
CHECKED
DRAFTED
DESIGNED
HIGH STREET
ELGIN IV30 1BX
COUNCIL OFFICE
DIRECT SERVICES - TRANSPORTATION
MORAY COUNCIL
CHECKED
DATE
BYDATE
BY
A940 Forres - Grantown Road
Grantown Road, Forres
TRO Proposed 40mph Speed Limit
Location Plan - Sheet 1 of 1
Apeed Limits /A940/2021/01
CA Stewart Sept 2022
CA Stewart Sept 2022
JD Smith Sept 2022
1:2000
LEGEND
Existing 30mph
Proposed 40mph
currently 30mph
Proposed 40mph
currently 60mph
Existing 60mph
Item 6
Page 413

Page 414

Page 414

Page 415

APPENDIX 3 
A940 GRANTOWN ROAD SPEED LIMIT - SUMMARY OF OBJECTORS
COMMENTS 
OBJECTORS CONCERNS TRANSPORTATION RESPONSE
The proposed speed limit
does not extend
southwards to include the
A940/U83e junction and
extend some 250m to the
south of the junction.
The siting of the proposed speed limit is in accordance with
the Scottish Government Guidance ‘Setting of Local Speed
Limits’ which takes the roadside environment in account
when determining the start/end of a speed limit along with
the level of the limit itself. The use of this national guidance
was approved by Committee in 2009: 
http://www.moray.gov.uk/minutes/data/DC20091013/Item%208.pdf 
The guidance states that if a speed limit is set in isolation or
is unrealistically low, it is likely to be ineffective and to lead
to possible disrespect for the speed limit. As well as requiring
significant and avoidable enforcement costs, this may also
result in substantial numbers of drivers continuing to travel
at unacceptable speeds, thus increasing the risk of accidents. 
The southern extent of the proposed 40mph speed limit has
been determined based on roadside development and
activity, in keeping with the guidance, and would be sited at
a location where visual ques to drivers are present to
encourage lower speeds. Whereas to the south of this
location there is no roadside development to provide a
visual que for a driver to lower their speed. 
The proposed speed limit
includes the introduction
of a 40mph speed limit.
The speed limit should be
30mph.
The proposed speed limit has been determined in
accordance with guidance. The roadside environment and
level/proximity of development to the A940 corresponds
with a 40mph speed limit. 
If a 30mph speed limit were to be introduced instead of the
40mph as stated in the guidance, there is an increased risk of
accidents due to drivers continuing to travel at unacceptable
speeds. 
The introduction of a 40mph was also recommended in the
independent Stage 1/2 Road Safety Audit for the R1
Knockomie development access. 
Item 6
Page 415

Page 416

OBJECTORS CONCERNS TRANSPORTATION RESPONSE
The U83e is used by
pedestrians and cyclists
and the visibility is ‘poor’.
The U83e is a signed leisure route for pedestrians and
cyclists. It does not provide general access to facilities such
as schools, retail or healthcare. Pedestrians/cyclists are
choosing to take this particular route when alternative
leisure routes are available in the area. 
To the south of the junction, the A940 is a straight road and
sightlines in excess of 215 metres can be provided once
roadside vegetation has been cleared. 
To the north, roadside vegetation can also obstruct the view.
However, there are planning conditions associated with the
development accessed via the U83e Whiterow to enhance
the visibility splay at the junction onto the A940. There is a
condition on the new development at Knockomie to clear
the roadside vegetation to provide visibility splay at the
access.   
Provision of these sightlines for vehicles will also greatly
enhance the sightlines for pedestrians and cyclists crossing
the A940 at the U83e junction. 
The clearance of these sightlines is being pursued. However,
the clearance of thick gorse and whin hedging is unable to
take place until the bird-nesting season has ended. 
The A940/U83e junction is
a ‘major danger/accident
spot’. 
There have been no reported accidents at this junction in the
past 10 years. 
Pedestrians currently walk
along the A940 between
the Falconer Avenue
Roundabout and the
A940/U83e junction.
There will be a new pedestrian/cycle route through the
Knockomie development, connecting the route at the
Falconer Avenue roundabout to U83e Whiterow. 
Once completed pedestrians and cyclists will have an
alternative route to walking in the verge and cycling in the
carriageway. 
Page 416

Page 417

OBJECTORS CONCERNS TRANSPORTATION RESPONSE
The Police will not agree
to a 30mph speed limit as
it will result in complaints
regarding speeding. 
Traffic speed cameras and
warning signs should be
installed to support
30mph speed limit. 
The determining factor for the introduction of a 40mph is
the roadside environment and layout of the road, not any
concern from Police Scotland with regard to enforcement.
Police Scotland are a statutory consultee and are satisfied
with the proposed changes to the speed limit. 
To promote a speed limit that does not take into account the
roadside environment would result in non-compliance, with
vehicles travelling above the signed speed limit. Police
Scotland do not have the resources to be present to enforce
speed limits at all times. The Scottish Safety Camera
programme is a national initiative. The safety camera sites
are selected using specific criteria, which must be met
before they can be considered. This criterion includes
recorded accidents and excessive vehicle speeds. The
location of the proposed speed limit on the urban edge
limited recorded accidents and observed speeds along the
frontage of the site (2019 Surveys) means that this location
would not meet the criteria. 
Page 417

Page 418

Page 418

Page 419

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 20 JUNE 2023 
SUBJECT: PAVEMENT PARKING PROPOSED EXEMPTION ORDER 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To seek approval of the Committee to begin the consultation process for a
proposed Exemption Order to introduce locations across Moray where there
are to be exemptions from the enforcement of the new Pavement Parking
legislation which is part of the Transport (Scotland) Act 2019: 
“Moray Council (Pavement Parking Exemptions) Order 2023” 
1.2 This report is submitted to Committee in terms of Section III (F) (17) and (20)
of the Council's Scheme of Administration relating to traffic management
functions including the preparation and implementation of traffic management
and the making of Orders for the regulation and management of traffic. 
2. RECOMMENDATION 
2.1 It is recommended that Committee:- 
i) approves the proposed Exemption Order at the locations shown
in Appendix 2 to this report from Pavement Parking legislation
and instruct the Head of Environmental and Commercial Services
and the Legal Services Manager to begin the statutory process;
and 
ii) instructs the Head of Environmental and Commercial Services
and the Legal Services Manager to make and implement the Order
if, following the consultation period, there are no outstanding
objections. 
3. BACKGROUND 
3.1 When vehicles park on the public footway, either partially or wholly, they can
restrict the available width for pedestrians, leading to vulnerable road users
having to step off the footway and onto the carriageway to pass the parked
vehicle. This can be challenging for the ambulant disabled, pedestrians with
Item 7
Page 419

Page 420

mobility aids such as walking frames, wheelchair users and parents/carers
with young children in pushchairs/prams or walking, as there are often no
dropped kerbs present. Part 6 of the Transport (Scotland) Act 2019 introduced
the statutory framework for a national ban on pavement parking, double-
parking and parking at dropped kerbs to make it easier to ensure that
pavements and roads are safer and more accessible for all. 
3.2 Transport Scotland have provided secondary legislation and parking
standards guidance that will underpin the enforcement of these parking
prohibitions from 1 December 2023. The legislation provides exceptions for
certain types of vehicles if they are involved in emergencies, e.g. ambulances,
and where vehicles are delivering goods and if they were not parking on the
footway then they would obstruct the carriageway. The legislation also
provides for the promotion of Exemption Orders for locations, which meet
certain criteria. 
3.3 The parking standards guidance sets out an assessment process and the
criteria for where exemptions to the pavement parking legislation can be
promoted. A copy of this guidance has been provided on the Members portal.
Scottish Government have provided funding for the road assessments to be
undertaken and to support the promotion and implementation of any
Exemption Orders. 
3.4 This report is to seek authority to promote Exemption Orders for locations of
the public footway (pavement) where parking is considered necessary to keep
the carriageway clear for emergency vehicles. There are very few locations in
Moray where this is actually necessary. The majority of pavement parking
observed is being undertaken based on convenience e.g. so residents can
park directly outside their property. 
3.5 This report is focused on the required assessment of potential Exemption
Orders. The Council’s position on enforcement will be subject of a future
report when there has been further clarity from Scottish Government. 
4. ASSESSMENT PROCESS 
4.1 The Parking Standards guidance states that a footway, or the carriageway
with which it is associated with, must have the following characteristics to be
considered for an Exemption Order: 
Either; 
a) The footway is of sufficient width to enable 1.5 metres (down to an
absolute minimum of 1,2 metres over a short distance to take account of
street furniture) to be available for the passage of non-vehicular traffic
(including pedestrians, wheelchair users and mobility scooters) when a
vehicle is parked on the footway; 
Or: 
b) The carriageway associated with the footway is of sufficient restricted
width or access that it would be rendered unpassable by emergency
Page 420

Page 421

vehicles when one or more vehicles are parked on the carriageway, but
would be possible to access if vehicles were permitted to park on the
footway. 
4.2 Transportation officers and local Roads Inspectors identified locations
throughout Moray where pavement parking has been observed and where, if
vehicles did not park either partially or wholly on the footway, they would
cause an obstruction to emergency vehicles. An email was also sent to all
Community Councils seeking information as to where they have observed
vehicles parking on the public footway. A list of the locations identified through
this process is attached as APPENDIX 1. 
4.3 The list of locations was then passed to a Transport specialist contracted to
undertake the site surveys and assessments on behalf of the Council. The
contractor has also prepared the drawings and schedules for the proposed
Exemption Order. The consultant visited the locations on the list during the
week commencing 1 May 2023. Each location was visited during the day and
in the evenings to observe parking behaviours and to gather measurements
and other information. 
4.4 The assessments were then undertaken through completion of the
spreadsheet tool provided within the guidance.  The locations which met the
criteria to be considered for an Exemption Order were then identified. The
following streets were identified as having locations where an Exemption
Order could be pursued (plans showing the relevant locations can be found in
APPENDIX 2): 
• Alves, Burghead Road;
• Buckie, Sutherland Street;
• Cullen, Seatown
• Dufftown, Queen Street;
• Elgin, Academy Street;
• Elgin, Mitchell Crescent;
• Hopeman, Thom Street; 
• Hopeman, Park Street; and
• Farquhar Street, Hopeman 
4.5 At some of the locations visited vehicles were parked either wholly or partially
on the footway. However, there are nearby on-street locations where parking
can take place on the carriageway without obstructing passing vehicles.
These locations have not been included in the list of locations for the
proposed Exemption Order. Furthermore, there are locations in newer
housing developments where on-plot parking has been provided (garage
and/or driveway) but residents are choosing instead to park either partially or
wholly on the footway outside their property. Again, these locations have not
been assessed, as there is off-street parking readily available. 
4.6 An Equalities Impact Assessment (EQIA) has been undertaken in accordance
with the guidance for each of the locations identified in paragraph 4.2. Copies
of these EQIAs have been uploaded to the Members Portal. 
Page 421

Page 422

4.7 A copy of the Schedule and Statement of Reasons for the proposed
Exemption Order can be found in APPENDIX 3 whilst the detailed plans are
contained within APPENDIX 2. 
4.8 Should the Committee approve the promotion of the proposed Order; the next
step will be to undertake consultation. The minimum time for the consultation
is 28 days, subject to the proposed order being advertised for a minimum
period of 7 days prior to the start of the consultation period.  If there are no
objections to the proposed order, the aim is for the order to be made with the
required road markings and signage in place for 1 December 2023, when
enforcement is due to commence. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The report encompasses the main aims of the Economic Development
programme by maintaining suitable transport facilities and infrastructure
as designated for their intended use. 
(b) Policy and Legal
The proposed Exemption Order is as a result of the national ban on
pavement parking, double-parking and parking at dropped kerbs, which
is Part 6 of the Transport (Scotland) Act 2019. 
The proposal complies with the requirements in the Road Traffic
Regulation Act 1984 and the Local Authorities’ Traffic Orders
(Procedures) (Scotland) Regulations 1999. 
(c) Financial implications
Scottish Government have provided a grant of £42,000 for the Road
Assessments, promoting the Exemption Order and the implementation of
the Order through the provision of road signs and road markings. There
is also Capital Signs and Road Markings budget available to support the
implementation of the Order. 
(d) Risk Implications
Without the introduction of exemptions at locations which meet the
criteria in the road assessments, residents will be subject to enforcement
and fines when parking on the public footway near their homes, where
they have no other option but to do so. 
There is a reputational risk to the Council if Exemptions for such
locations are not pursued. 
(e) Staffing Implications
There are no staffing implications arising from this report. 
(f) Property
There are no property implications arising from this report. 
Page 422

Page 423

(g) Equalities/Socio Economic Impact
Vehicles parking either partially or wholly on the public footway can
present an obstruction to pedestrians and present a hazard to those with
restricted mobility and/or visual impairments. 
The guidance provided to support the parking assessments includes a
requirement to undertake EQIAs for the locations where an Exemption
Order is being promoted. 
(h) Climate Change and Biodiversity Impacts
No Climate Change or biodiversity implications have been determined
for the proposed Exemption Order. 
(i) Consultations
The Depute Chief Executive (Economy, Environment & Finance), Head
of Environmental and Commercial Services; Chief Financial Officer,
Legal Services Manager, Equal Opportunities Officer, Climate Change
Strategy Officer, Committee Services Officer (L Rowan) and L Morrison,
Police Scotland, have been consulted and any comments taken into
consideration. 
All Elected Members have been advised of the proposals and any
comments that they have may be tabled at the meeting. 
6. CONCLUSION 
6.1 It is proposed to promote an Order, which will have the effect of
introducing exemptions to the Pavement Parking legislation at the
locations specified in the schedule in APPENDIX 3 and the plans in
APPENDIX 2. 
Author of Report: Diane Anderson, Senior Engineer Transportation 
Background Papers: 
Ref: SPMAN-524642768-879 
Page 423

Page 424

Page 424

Page 425

APPENDIX 1 
PAVEMENT PARKING EXEMPTION ORDER – LOCATIONS FOR
ASSESSMENT IDENTIFIED BY OFFICERS AND COMMUNITY COUNCILS 
SOURCE SETTLEMENT ROAD NAME
Officers Alves Burghead Road
Officers Buckie Hay Street
Officers Buckie John Street
Officers Buckie Midmar Street
Officers Buckie Milton Drive
Officers Buckie Robert Street
Officers Buckie Sutherland Street
Officers Buckie The Yardie
Officers Burghead Grant Street
Officers Burghead King Street
Officers Burghead Sellar Street
Officers Cullen Binview Road
Officers Cullen Logie Avenue
Officers Cullen Seafield Street
Officers Cullen Seatown Area
Officers Dufftown Queen Street
Officers Elgin Academy Street
Officers Elgin Argus Place
Officers Elgin Batchen Street
Officers Elgin Blantyre Place
Officers Elgin Blantyre Street
Officers Elgin Braco Place
Officers Elgin Bremner Drive
Officers Elgin Chanonry Road
Officers Elgin Chanonry Road South
Officers Elgin Covesea Road
Officers Elgin Esmonde Gardens
Officers Elgin Glenlossie Drive
Officers Elgin High Street
Officers Elgin High Street
Officers Elgin King Street
Officers Elgin Main Street
Officers Elgin Mitchell Crescent
Officers Elgin Myreside Circle
Officers Elgin New Elgin Road
Officers Elgin South Street
Officers Elgin St Catherine's Place
Item 7
Page 425

Page 426

SOURCE SETTLEMENT ROAD NAME
Officers Elgin Weaver Place
Officers Findhorn Main Road
Officers Findochty Dyce Crescent
Officers Findochty Harbour & Seatown area
Officers Findochty Morven Crescent
Officers Findochty The Creagan
Officers Fochabers Burnbank
Officers Fochabers Castle Street
Officers Fochabers Institution Road
Officers Fochabers Maxwell Street
Officers Fochabers Milnescroft Court
Officers Fochabers Murrayfield
Officers Fochabers Other streets (off High St)
Officers Fochabers West Street
Officers Fochabers Westmorland Street
Officers Forres Fleurs Drive
Officers Forres Forbeshill
Officers Forres High Street
Officers Forres Highfield
Officers Forres Sheildaig Road
Officers Forres Tolbooth Street
Officers Hopeman Dunbar Street
Officers Hopeman Farquhar Street
Officers Hopeman Hutcheon Street
Officers Hopeman New Street
Officers Hopeman Other streets (off Harbour Street)
Officers Hopeman Park Street
Officers Hopeman Thom Street
Officers Lossiemouth Baker Street
Officers Lossiemouth Bishops Court
Officers Lossiemouth Carvel Street
Officers Lossiemouth Coulardbank Crescent
Officers Lossiemouth Coulardhill
Officers Lossiemouth Cromarty Court
Officers Lossiemouth Fulmar Road
Officers Lossiemouth Rockall Place
Officers Lossiemouth St Margarets Crescent
Officers Newmill Isla Road
Officers Newmill Marks Lane
Officers Portgordon Gordon Street
Officers Portknockie Blantyre Street
Officers Portknockie Mid Street
Officers Rothes Burnside Street
Officers Rothes Land Street
Page 426

Page 427

SOURCE SETTLEMENT ROAD NAME
Officers Tomintoul Conglass Lane
Community Cullen Foreshore Road
Community Duffus Burnside Road
Community Duffus Milne Road
Community Duffus Gordonstoun Road
Community Findochty Reidhaven Crescent
Community Findochty Main Street
Community Findochty Sterlochy Street
Community Findochty Old Street
Community Findochty Siller Street
Community Findochty Station Street
Community Findochty Commercial Street
Community Findochty New Street
Community Findochty Duke Street
Community Findochty North Blantyre Street
Community Findochty Church Street
Community Forres Anderson Crescent
Community Forres North Road
Community Portknockie New Street
Community Portknockie Patrol Place
Community Portknockie High Street 
Page 427

Page 428

Page 428

Page 429

!I
Layer Credits: OS Open Greyscale Labels: Contains OS data © Crown Copyright and database right 2020 Created by:
LeesonC
Last Updated:
05/06/2023
Legend
Proposed Pavement Parking Exemption
Moray Pavement Parking
Exemptions
Burghead Road, Alves
Parking Exemption 1
0 0.01 0.01 0.02
Kilometres Scale: 1:500
9
Item 7
Page 429

Page 430

!I
Layer Credits: OS Open Greyscale Labels: Contains OS data © Crown Copyright and database right 2020 Created by:
LeesonC
Last Updated:
05/06/2023
Legend
Proposed Pavement Parking Exemption
Moray Pavement Parking
Exemptions
Sutherland Street, Buckie
Parking Exemption 2
0 0.01 0.01 0.02
Kilometres Scale: 1:500
Page 430

Page 431

!I
Layer Credits: OS Open Greyscale Labels: Contains OS data © Crown Copyright and database right 2020 Created by:
LeesonC
Last Updated:
05/06/2023
Legend
Proposed Pavement Parking Exemption
Moray Pavement Parking
Exemptions
Seatown, Cullen
Parking Exemption 3
Bayview Court, Seatown, Cullen
Parking Exemption 13
0 0.01 0.02 0.03
Kilometres Scale: 1:1,000
Exemption 3
Exemption 13
21
79
86
85
Page 431

Page 432

!I
Layer Credits: OS Open Greyscale Labels: Contains OS data © Crown Copyright and database right 2020 Created by:
LeesonC
Last Updated:
05/06/2023
Legend
Proposed Pavement Parking Exemption
Moray Pavement Parking
Exemptions
Queen Street, Dufftown
Parking Exemption 4
0 0.01 0.01 0.02
Kilometres Scale: 1:500
6
5
1
Page 432

Page 433

!I
Layer Credits: OS Open Greyscale Labels: Contains OS data © Crown Copyright and database right 2020 Created by:
LeesonC
Last Updated:
05/06/2023
Legend
Proposed Pavement Parking Exemption
Moray Pavement Parking
Exemptions
Academy Street, Elgin
Parking Exemption 5, 6, 7, 8, 9 & 10
0 0.01 0.02 0.03
Kilometres Scale: 1:750
Exemption 5
Exemption 10
Exemption 6
Exemption 7
Exemption 8
Exemption 9
18
22
34
Page 433

Page 434

!I
Layer Credits: OS Open Greyscale Labels: Contains OS data © Crown Copyright and database right 2020 Created by:
LeesonC
Last Updated:
05/06/2023
Legend
Proposed Pavement Parking Exemption
Moray Pavement Parking
Exemptions
Mitchell Crescent, Elgin
Parking Exemption 11
0 0.01 0.02 0.03
Kilometres Scale: 1:750
1
11
Page 434

Page 435

!I
Layer Credits: OS Open Greyscale Labels: Contains OS data © Crown Copyright and database right 2020 Created by:
LeesonC
Last Updated:
05/06/2023
Legend
Proposed Pavement Parking Exemption
Moray Pavement Parking
Exemptions
Park Street, Hopeman
Parking Exemption 12
0 0.01 0.02 0.03
Kilometres Scale: 1:1,000
Page 435

Page 436

!I
Layer Credits: OS Open Greyscale Labels: Contains OS data © Crown Copyright and database right 2020 Created by:
LeesonC
Last Updated:
06/06/2023
Legend
Proposed Pavement Parking Exemption
Moray Pavement Parking
Exemptions
Thom Street, Hopeman
Parking Exemption 14, 15 & 16
Farquhar Street, Hopeman
Parking Exemption 17, 18, 19 & 20
0 0.01 0.03 0.04
Kilometres Scale: 1:1,250
29
27
13 11
Exemption 14
Exemption 15
Exemption 16
31
27
23 21
13
11
Exemption 17
Exemption 18
Exemption 19
Exemption 20
Page 436

Page 437

APPENDIX 3
MORAY COUNCIL (PAVEMENT PARKING EXEMPTION) ORDER 2023
Moray Council propose to make the above Order under Section 51 the Transport (Scotland) Act 2019.
The general effect will be to exempt from the enforcement of Pavement Parking locations on
Burghead Road, Alves (east side); Sutherland Street, Buckie (west side); Seatown, Cullen (south side),
Queen Street, Dufftown (west side), Academy Street, Elgin (east side); Mitchell Crescent, Elgin (north
side); Park Street, Hopeman (both sides); Thom Street, Hopeman (north side) and Farquhar Street,
Hopeman (north side) as specified in the Schedule to the Order. The proposed exemptions will cover
specific areas as defined on street by road markings and signage where pavement parking will be
exempt from enforcement, in the interest of maintaining access for emergency and service vehicles. 
STATEMENT OF REASONS
In order to improve footway and carriageway accessibility for pedestrians, particularly vulnerable road
users or those with mobility impairments, the Scottish Government is addressing inconsiderate
parking through improved parking legislation. The Transport (Scotland) Act 2019 prohibits pavement
parking, double parking and parking at known crossing points. Section 51 of the Transport (Scotland)
Act 2019 enables Roads Authorities to introduce Exemptions to enable pavement parking within
specific areas defined on street by road markings and signage. The Parking Standards guidance which
accompanies the Act states that a footway, or the carriageway with which it is associated with, must
have the following characteristics to be considered for an Exemption Order: 
Either; 
a) The footway is of sufficient width to enable 1.5 metres (down to an absolute minimum of
1.2 metres over a short distance to take account of street furniture) to be available for the
passage of non-vehicular traffic (including pedestrians, wheelchair users and mobility
scooters) when a vehicle is parked on the footway; 
Or:
b) The carriageway associated with the footway is of sufficient restricted width or access that
it would be rendered unpassable by emergency vehicles when one or more vehicles are
parked on the carriageway, but would be possible to access if vehicles were permitted to
park on the footway. 
A Pavement Parking Assessment has been undertaken which identifies that the locations set out in
the Schedule to have one of the above characteristics.    
Item 7
Page 437

Page 438

MORAY COUNCIL
UNDER SECTION 51 OF THE TRANSPORT (SCOTLAND) ACT 2019
MORAY COUNCIL (PAVEMENT PARKING EXEMPTION) ORDER 2023 
SCHEDULE 
No Location Description
1
2
3
4
5
6
7
Burghead Road, Alves
(East Side) 
Sutherland Street, Buckie
(West Side) 
Seatown, Cullen
(South Side) 
Queen Street, Dufftown
(West Side) 
Academy Street, Elgin
(East side) 
From a point 7 metres or thereby south of the extended
building line of Number 9 Burghead Road southwards for
a distance of 16 metres.  This exemption is applicable
over a footway width such that an effective width of 1.5
metres of footway is maintained from the existing back
of footway. 
From a point 6 metres north from the extended northern
kerb line of Alexander Street northwards for a distance
of 30 metres or thereby 
From a point 3 metres west or thereby of the extended
building line of Number 85 Seatown westwards for a
distance of 65 metres or thereby to a point 1.5 metres
east of Number 79 Seatown. 
From the extended northern building line of Number 5
Queen Street, south for 45 metres or thereby to the
extended northern building line of Number 1 Queen
Street 
From 1.5 metres north of the extended northern building
line of the pend at Number 18 Academy Street
northwards for 5 metres or thereby. 
From 3 metres or thereby south of the extended
southern building line of the pend at Number 18
Academy Street southwards for 5 metres or thereby. 
From the extended southern building line of Number 22
Academy Street northwards for 10 metres or thereby. 
Page 438

Page 439

8 
9
10 
11 
12 
13 
14 
15 
16 
Mitchell Crescent, Elgin 
(North Side) 
Park Street, Hopeman
(Both sides) 
Seatown, Cullen
(South Side) 
Thom Street, Hopeman 
(North Side) 
From a point 16 metres south of the extended southern
carriageway extents of Maida Place southwards for a
distance of 8 metres or thereby 
From a point 2 metres south of the extended northern
boundary line of Number 34 Academy Street southwards
for a distance of 6 metres or thereby 
From a point 8 metres north of the extended northern
kerb line of Alma Place northwards for a distance of 11
metres or thereby 
From a point 7 metres west or thereby from the
extended western building line of Number 1 Mitchell
Crescent, eastwards for 63 metres or thereby to a point
5 metres west of the extended eastern building line of
Number 11 Mitchell Crescent. 
From a point 10 metres south of the extended kerb line
of Duff Street, for a distance of 125 metres or thereby to
a point 10 metres north of the extended kerb line of
Cooper Street 
From the extended eastern building line of Number 21
Bayview Court westwards for 16 metres or thereby.  
This exemption is applicable over a footway width such
that an effective width of 1.5 metres of footway is
maintained from the existing back of footway. 
From a point 10 metres or thereby east of the extended
kerb line of Harbour Street eastwards to a point 5
metres or thereby west of the extended eastern building
line of Number 29 Thom Street.            
From a point 5 metres or thereby east of the extended
western boundary line of Number 27 Thom Street
eastwards to a point 5 metres or thereby west of the
extended eastern boundary line of Number 13 Thom
Street. 
From a point 5 metres or thereby east of the extended
western boundary line of Number 11 Thom Street
eastwards to a point 10 metres or thereby west of the
extended eastern kerb line of School Road. 
Page 439

Page 440

17 
18 
19 
20
Farquhar Street, Hopeman
(North Side) 
From a point 10 metres or thereby east of the extended
kerb line of Harbour Street eastwards to a point 7
metres or thereby west of the extended eastern
boundary line of Number 31 Farquhar Street. 
From a point 5 metres or thereby east of the extended
western boundary line of Number 27 Farquhar Street
eastwards to a point 5 metres or thereby west of the
extended eastern boundary line of Number 23 Farquhar
Street. 
From a point 5 metres or thereby east of the extended
western boundary line of Number 21 Farquhar Street
eastwards to a point 5 metres or thereby west of the
extended eastern boundary line of Number 13 Farquhar
Street. 
From a point 5 metres or thereby east of the extended
western boundary line of Number 11 Farquhar Street
eastwards to a point 10 metres or thereby west of the
extended eastern kerb line of School Road. 
Page 440

Page 441

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 20 JUNE 2023 
SUBJECT: ELECTRIC VEHICLE INFRSTRUCTURE FUND STRATEGY AND
EXPANSION PLAN – PATHFINDER PROJECT UPDATE 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To seek approval of the Committee to join the Pathfinder Project for the
provision and operation of publicly available electric vehicle charging
infrastructure following the completion of market testing. 
1.2 This report is submitted to Committee in terms of Section II (F) (17) of the
Council's Scheme of Administration relating to traffic management. 
2. RECOMMENDATION 
2.1 It is recommended that Committee approves the proposal to join the
Pathfinder Project for the provision and operation of publicly available
electric vehicle charging infrastructure. 
3. BACKGROUND 
3.1 The Scottish Government’s Programme for Government includes a
commitment to phase out new petrol and diesel cars and vans across
Scotland by 2032. Electric vehicles are, at this time, the main solution to
providing mobility without the use of fossil fuels and are widely expected to
continue to play an important role in achieving reductions in transport related
emissions. 
3.2 In February 2023 this Committee approved the Strategy and Expansion Plan
for publicly available electric vehicle charging infrastructure in Moray. In
Section 5.3 of that report, reference is made to the ‘Pathfinder Project’, which
covers Highland, Aberdeenshire and Aberdeen City Councils. 
3.3 The Pathfinder Project is a joint procurement exercise between these three
authorities seeking private operators for the provision and expansion of the
publicly available charging networks in their areas. During late 2022/early
2023 a Prior Information Notice (PIN) was issued seeking expressions of
interest from private operators. Moray Council was included in the information
Item 8
Page 441

Page 442

pack as a potential authority who may be interested in joining the project in
the future. 
3.4 The PIN has now been completed and information gathered from the
responses from the potential operators suppliers. This information has been
reviewed by Highland, Aberdeenshire and Aberdeen Councils. HiTrans have
also been part of the review process as they are representing Moray and the
other Councils in the HiTrans Region. Operators have been interested in
Moray, due to its geographical location sited between the other local
authorities in the Pathfinder Project and its position on both the A96 and A95
strategic corridors. 
3.5 There are synergies in approaches to the future operation and expansion of
the Pathfinder Project partners and Moray Council in terms of the packaging
of existing and future chargers into ‘Lots’ which cover a range of higher and
lower utilisation sites. There is also a similar approach in terms of starting with
packages of existing assets, then moving on to new expansion sites and
finally to on-street charging locations. 
3.6 The Pathfinder Project has three key objectives which align with Moray
Council’s approach to the provision of publically available charging
infrastructure: 
• Community Wealth Building, Community Benefits and Economic Social
Governance including training and the development of local supply
chains for repairs and servicing;
• Net Zero Journey, ensuring operations and expansion support a Just
Transition; and
• Commercial development, retaining an interest in the existing and
future sites, but with a fair share of any profit coming back to the
Councils, including a share of any new revenue streams other than
charging in the future. 
3.7 The Pathfinder Project Team will be drafting the tender documents during
June/July of this year with a view to publishing the tenders in
August/September. Evaluation of the submitted tenders is expected to take
place throughout the autumn with an appointment (or appointments) by March
2024. Following a period of set-up and implementation with the successful
bidder/s they will then commence to operate existing chargers, provide back
of office facilities and expand the publicly available charging network as per
each Council’s Strategy and Expansion Plan. Subject to funding from Scottish
Government and private investment, it is then expected that further
procurement will take place for the expansion of the publicly available
charging network, including on-street charger provision in Moray. 
3.8 Collaborative working across local authorities is encouraged by Scottish
Government and by joining the Pathfinder Project Moray will be more
attractive to private investment. There are also efficiencies resulting from
being part of a joint procurement exercise and utilising contract documents,
which have already been developed by the Pathfinder Project. 
Page 442

Page 443

3.9 In terms of the draft Electric Vehicle Strategy and Expansion Plan, Scottish
Futures Trust have reviewed our submission and have indicated that they
have revised their planning assumptions and updated their Feasibility Model,
which has been used to develop the Business Case. 
3.10 At this time officers are awaiting the award of further enabling grant funding
from Scottish Government before the changes to the submission can be
made, including the re-running of the financial modelling to incorporate the
changes made by Scottish Futures Trust. The next update report to this
committee the EVIF Strategy and Expansion Plan will be after the Pathfinder
Project procurement process has been completed. 
3.11 Finally, in the report Charges for Services to Corporate Committee on 31
January 2023 Item 8 paragraph 2.1 ii), delegated authority was granted for
varying charges in relation to services where electricity supply was part of the
fee. This authority includes the review of charges for council operated Electric
Vehicle charge points. A review of these charges will be undertaken over the
summer period, taking into consideration the changing costs of electricity to
the Council. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The Strategy and Expansion Plan sits within the approach of the council
in its Corporate Plan of looking after the world we live in, whilst
supporting the priority of creating a sustainable council through seeking
grant funding and commercial partners to provide and operate the
publically available electric vehicle infrastructure in Moray. 
(b) Policy and Legal
Scottish Government’s draft vision for Scotland’s Public Electric Vehicle
Charging Network sets out the future approach to funding to provide,
expand and operate the network.  The draft Strategy and Expansion
Plan and supporting Business Case have been prepared taking the draft
vision into account and following the template and guidelines, and using
the supporting data provided by Scottish Government and Scottish
Futures Trust. 
(c) Financial implications
The operation and maintenance costs of the council’s existing charging
infrastructure are met through revenue budgets, utilising the income from
the charge posts. As the existing infrastructure gets older, maintenance
costs are likely to increase. 
Further expansion of the publically available charging network in Moray
would be through a combination of Scottish Government grant funding
and private investment. If funding was not forthcoming then expansion
sites would not be taken forward. 
Page 443

Page 444

(d) Risk Implications
Without an approved Electric Vehicle Infrastructure Strategy and
Expansion Plan the Council will be unable to make applications to the
Scottish Government Electric Vehicle Infrastructure Fund (EVIF), which
aims to provide £60m of funding to support the expansion of the
publically available charging network in Scotland. 
For EV charging sites within off-street car parks and on Council land that
is part of ‘Common Good’ there may be a requirement to gain Court
Consent to enable a private operator to install and/or operate above
ground infrastructure. 
(e) Staffing Implications
There are no staffing implications arising from this report as the delivery
of the draft Electric Vehicle Infrastructure Strategy and Expansion Plan is
part of existing staff duties. However, the delivery and implementation of
the strategy and expansion plan will require staff input from
Procurement, Legal and Property Services. These services are all
currently operating at capacity and the implementation and on-going
management of the strategy may require additional resource,
outsourcing or other work to be de-prioritised. 
Part of the EVIF enabling grant from Scottish Government will be used to
contribute towards a HiTrans officer acting as a shared resource to
enable collaboration across a number of authorities in the north of
Scotland and across the islands, and to represent the Council in the
Pathfinder project that covers Highland, Aberdeenshire and Aberdeen
City councils. Collaborative working across local authorities is
encouraged as part of the Scottish Government draft vision for
Scotland’s Public Electric Vehicle Charging Network. 
(f) Property
The location of existing Moray Council charging infrastructure is within
public car parks and on Council and Common Good assets. The plans
for expansion focus on locations under the control of the Council.
Community Asset Transfers (CATs) may reduce the number of locations
available. The inclusion of some sites within the Expansion Plan may
mean that they are no longer suitable for a CAT. 
(g) Equalities/Socio Economic Impact
The strategy and expansion plan has been developed following the
guidance provided by Scottish Government, Scottish Futures Trust
Public EV Charging Strategy and Expansion Plan Template. This
guidance includes specific consideration of the provision of electric
vehicle charging infrastructure on the relevant protected characteristics
in Section 4.2 of the draft Strategy and Expansion Plan, as required by
the SG guidance. New guidance on the design of charging infrastructure,
to ensure that where practical it is fully accessible, is being developed by
Scottish Government. Any new charging infrastructure will be required to
follow this guidance. 
Page 444

Page 445

PAS 1899:2022 is a new specification on accessible public charge points
for electric powered vehicles. It covers the design and placement of
charge points, including the location spacing and surrounding
environment as well as the information, signals and indicators to be
provided. www.bsigroup.com/en-GB/standards/pas-1899/ 
(h) Climate Change and Biodiversity Impacts
Developing a strategy and guidance for the provision of publically
available electric vehicles charging infrastructure is one of the key
actions in the key actions in the Council’s Route Map to Net Zero, which
supports the Council’s Climate Change Strategy. 
Providing publically available charging infrastructure supports and
encourages the change from fossil fuelled vehicles to electric and hybrid
vehicles through addressing issues such as ‘range anxiety’ and proving
charging facilities for households with no off-street parking. The use of
electric and hybrid vehicles reduces emissions, which supports nature
recovery and the overall improvement of environments. 
(i) Consultations
The Depute Chief Executive (Economy, Environment and Finance),
Head of Environmental and Commercial Services, Legal Services
Manager, Chief Finance Officer, Equalities Officer, Principal Climate
Change Officer, Assistant Procurement Manager, Asset Manager
(Commercial Buildings), Roads Maintenance Manager and Committee
Services Officer (L Rowan) have been consulted and any comments
taken into consideration. 
5. CONCLUSION 
5.1 It is proposed to join the Pathfinder Project with Aberdeenshire,
Aberdeen and Highland Councils to seek private investment for the
expansion and operation of the publically available Electric Vehicle
Charging Infrastructure in Moray, optimising the procurement process
and capitalising on the geographic context of Moray in relation to the
A95 and A96 corridors. 
Author of Report: Diane Anderson, Senior Engineer Transportation 
Background Papers: EVIF Committee Report 7 February 2023 
Ref: SPMAN-524642768-911 
Page 445

Page 446

Page 446

Page 447

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 20 JUNE 2023 
SUBJECT: PERFORMANCE REPORT (ENVIRONMENTAL AND
COMMERCIAL SERVICES) – PERIOD TO 31 MARCH 2023 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the performance of the service for the period to 31
March 2023. 
1.2 This report is submitted to Committee in terms of Section III (A) (4) of the
Council's Scheme of Administration to monitor performance in accordance
with the Council’s Performance Management Framework. 
2. RECOMMENDATION 
2.1  It is recommended that Committee: 
(i) scrutinises performance in the areas of Service Planning, Service
Performance and other related data to the end of March 2023;  
(ii) notes the actions being taken to improve performance where
required. 
3. BACKGROUND 
3.1 On 7 August 2019, the Moray Council approved a revised Performance
Management Framework for services (para 5 of the minute refers). 
4. SERVICE PLANNING 
4.1 Each service plan sets out the strategic and service level priorities and
outcomes it intends to deliver in the coming year aligning closely with financial
planning, corporate and community planning partnership strategic priorities. 
This report provides an interim update on progress on the service plan, key
outcomes and performance indicators.  Committee is invited to review
progress to secure assurance that is satisfactory and to provide scrutiny and
further direction where performance requires attention.   
Item 9
Page 447

Page 448

4.2 Latest Local Government Benchmarking Framework (LGBF) Indicators
covering 2021/22, initially published in February 2023, will be refreshed in
June.  The full suite can be viewed using the My Local Council tool.  Published
indicators for this service have been incorporated within the relevant section of
this report depending on whether results are used to evidence progress
against strategic, service plan or service performance priorities.  2022/23
LGBF data will be available early 2024.   
4.3 The narrative included is by exception, links to Service Plan Actions and
Performance Indicators can be accessed within the Background Papers
section of this report.   
Strategic Outcomes – successes 
4.4 Good progress has been made to promote and develop green travel in
schools and deliver additional cycle parking.  In 2022/23, a total of 31 primary
schools delivered Bikeability with 630 pupils completing the course.  Eight
schools are involved in the Park Smart Initiative with 19 taking part in the
Travel Tracker programme helping to increase sustainable primary school
journeys by 51% to 318,346.  The Participatory Budgeting project is also well
underway with steering groups created in both Buckie and Keith and
consultations ongoing.  (Actions ECS22-25 Section 4ai and 4aii and PIs
ECSTTM01 and ECSTTM05). 
4.5 After delays due to amended guidance and additional work, a draft strategy
for Electric Vehicle Charging Infrastructure was approved at a meeting of this
committee on 7 February 2023 (para 9 of the Minute refers).  Next steps are
included in the 2023/24 Service Plan.  (Action ECS22-25 Section 4ci). 
Strategic Outcomes – challenges and actions to support 
4.6 Nothing to report. 
Service Level Outcomes – successes 
4.7 Actions to improve the school meal service have been achieved.  Satisfaction
with the service has increased to 65% while uptake rates either achieved or
exceeded target.  Both menus for Early Learning settings and Primary
Schools have received bronze level Food for Life awards with 75% of all
RAG
STRATEGIC
LEVEL Growing, diverse & sustainable economy 69%
Improving the Transportation Network 25%
Growing, diverse & sustainable economy/Our Future 95%
Establishing Joint Energy from Waste Facilities 90%
Improving our operations 95%
Improving our tourism and visitor economy 100%
Delivering capital projects 80%
Delivering capital projects and promoting wellbeing 85%
Workforce development 85%
76%
SERVICE PLAN OUTCOMES
OVERALL PLAN PROGRESS
SERVICE
LEVEL
Comment:   At the end of March, some areas of the plan are out with original
target timescales, in particular the action to deliver a Road Safety Plan in
partnership with CPP members. Work that remains oustanding will continue as
part of the 2023/24 Service Plan.
Page 448

Page 449

dishes cooked from scratch using locally sourced ingredients.  (Action ECS22-
25 Section 5g, PIs ECSEPBCC02, 02a and 10). 
4.8  All planned work to increase recycling in Moray is complete with several
engagement campaigns delivered by the Waste and Climate Change teams. 
Latest Local Government Benchmarking Framework (LGBF) data for 2021/22
reported a decline in recycled waste from 54.9% to 52.2%, however Moray
remains above the national average of 42.7% and ranked in the top quartile of
all local authorities.  Focus on reversing this decline and achieving a 60%
recycling rate will continue as part of the 2023/24 Service Plan.  (Action
ECS22-25 Section 5h, PI ENV6). 
Service Level Outcomes – challenges and actions to support 
4.9 Production of a Road Safety Plan will continue out with original target
timescales as part of the 2023/24 Service Plan.  With a vacancy in the team,
work has continued where possible with analysis of data due to commence in
April and a report expected late 2023.  Albeit no longer a statutory
requirement, having a Road Safety Plan will help lever additional Road Safety
Capital Funding and respond to legislative requirement.  (Action ECS22-25
Section 5a). 
4.10 Delivery of a Buckie Harbour Masterplan is well advanced at 95% complete
with lease agreements finalised with Ocean Winds in December.  Revisions to
the Plan, following further stakeholder engagements will be finalised in the
next reporting quarter.  (Action ECS22-25 Section 5b). 
4.11 The Joint Energy from Waste project, originally expected to be operational by
March 2023, is now scheduled for completion by summer 2023.  Hot
commissioning commenced in February with waste from Aberdeen City and
Aberdeenshire Councils delivered to site.  Deliveries from Moray are expected
in the near future.  (Action ECS22-25 Section 5c). 
4.12 The self-assessment of Roads Maintenance is on track with both the
assessment and action plan finalised.  All mandatory training has been
completed.  The final ERDPs are to be undertaken for those absent due to
leave in the period to June.  (Action ECS22-25 Section 5li and 5lii, PI
ERDP.ECS3). 
5 SERVICE PERFORMANCE 
5.1 In line with Performance Management Framework, operational performance is
monitored quarterly by departmental management.  Areas performing well
and/or areas subject to a decreasing trend or where benchmarking results
show performance below comparators will be reported to this Committee for
member scrutiny. 
5.2 The narrative included is by exception, links to Service Performance
Indicators can be accessed within the Background Papers section of this
report.   
Page 449

Page 450

Operational Indicators – successes 
5.3 Average occupancy of paid car parks in Elgin has continued to improve during
2022/23 with an annual above target rate of 53%.  The popularity of the Pay
by Phone app continues, accounting for 29.2% of all car park payments
received over the last year.  (PIs ECSTCP01 and Management PI
ECSTCP04). 
5.4 LGBF 2021/22 data reported the net cost of waste collection per premise was
£33.84, a decrease from £35.70 in 2020/21.  For the second consecutive
year, Moray has the lowest collection cost, 52% less than the Scottish
average of £70.09.  (PI ENV1a). 
5.5 The net cost of street cleaning per 1,000 population increased by 7% in
2021/22 to £7,970, however the ranked position improved two places to that
of 3rd lowest in terms of cost, 46% less than the Scottish average.  (PI
ENV3a). 
5.6 Maintenance costs per kilometre of road in Moray increased by 17% in
2021/22 to £5,164, achieving a ranking of 3rd lowest cost against all other
authorities and 53% less than the Scottish average.  Encouragingly road
condition across all categories also improved striking a positive balance
between cost and condition. (PI ENV4a-e). 
Operational Indicators – challenges and actions to support 
5.7 The unit cost per vehicle and plant maintenance in quarter 4, increased to
£254, slightly above target (£205).  Resourcing issues over the busy winter
months for the maintenance team resulted in additional subcontracting costs. 
Efforts are ongoing to fill vacant posts.  (PI ECSRMF02). 
5.8 Although there is improvement in the quarter to March 2023, the net unit cost
per passenger per trip of the Dial M Service at £6.15 remains above target
(£5.20).  Launch of the rebranded service to ‘m-connect’ in early May 2023
will provide greater flexibility to create and manage journeys through the
addition of a dedicated app, aiming to increase the number of passengers
whether for employment, education or leisure.  (PI ECSTPT01). 
Page 450

Page 451

6 OTHER PERFORMANCE RELATED DATA 
Complaints & MP/MSP Enquiries 
6.1 In line with the Performance Management Framework, complaints are
reviewed quarterly by departmental management in terms of time taken to
respond, outcome and learning points.  Detailed tables can be accessed
within the Background Papers section of this report.   
6.2 During the second half of 2022/23, Environmental and Commercial Services
received a total of 105 complaints; an increase of 23 (28%) compared to the
same period last year.  Despite this, complaints continue to remain below pre-
COVID levels in 2019/20 when 136 complaints were received in quarters 3
and 4.   
6.3 In the six months to the end of March, 105 complaints were closed; 100 (95%)
as Frontline, 4 (4%) as Investigative and 1 (1%) as an Escalated complaint
evidencing in line with guidance, the majority of complaints are dealt with at
the point closest to service delivery.  87 Frontline complaints (87%) met the 5
working day target with an average response time of 3.79 days.  Three
Investigative complaints (75%) achieved the 20 working days target with an
average response time of 17.8 days.  The Escalated complaint met target with
a response time of 19 days.   
6.4 42 closed complaints (40%) were upheld or partially upheld with 22 (52%)
relating to Household Collections.  Common themes included issues around
working practices, missed bins due to bad weather and changes to the format
of online collection calendars.  To address these, crews have been reminded
of best practice and Service Alert emails have been promoted to improve
communication with the public.  Changes to the online calendar were due to
ICT issues and a return to the old format is not possible.   
6.5 In addition to complaints, a total of 66 MP/MSP enquiries were received
during quarters 3 and 4.  The most common issues raised related to
gritting/snow clearing and road safety/speeding concerns.   
Other Performance (not included in the Service Plan) 
Page 451

Page 452

6.6 Environmental and Commercial Services were finalists in a number of Best
and Most Improved Performer categories at the APSE Performance Network
Awards 2022 in November.  Building Cleaning, Building Maintenance and
Street Lighting were included as Best Performers while Building Maintenance
was also a finalist under Most Improved along with Catering, Cemeteries and
Roads Maintenance.   
Case Studies 
6.7 Nothing to report. 
Consultation and Engagement 
6.8 A Customer Satisfaction Survey covering Open Spaces, Cemeteries and
Waste Services was undertaken with local Community Councils and
Associations.  A high proportion of replies stated staff in all three areas were
friendly and approachable while other positive responses noted the high
standard of ground maintenance in cemeteries and the reliable service
provided by the Waste Team.  Areas for improvement included contact
information for Open Spaces and Cemeteries, provision of public toilets and
street cleaning.   
7  SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Performance measurement is used to ensure the efficient and
sustainable delivery of services to meet the Council’s priorities in both
the Corporate Plan and the LOIP. 
(b) Policy and Legal
The Council has a statutory requirement to publish a range of
information that will demonstrate that it is securing best value and assist
in comparing performance both over time and between authorities where
appropriate. 
(c) Financial implications
None. 
(d) Risk Implications
None. 
(e) Staffing Implications
None. 
(f) Property
None. 
(g) Equalities/Socio Economic Impact
An Equality Impact Assessment is not needed because the report is to
inform the Committee on performance. 
(h) Climate Change and Biodiversity Impacts
Page 452

Page 453

None 
Page 453

Page 454

(i) Consultations
Depute Chief Executive (Economy, Environment and Finance), The
Head of Environmental and Commercial Services, Head of Financial
Services, Service Managers, Legal Services Manager, the Equal
Opportunities Officer and Lissa Rowan, Committee Services Officer have
been consulted, with any comments received incorporated into this
report. 
8. CONCLUSIONS 
8.1 As at March 2023, the Environmental and Commercial Services Service
Plan is 76% complete.  Of the 3 outcomes not meeting expected due
dates, 2 are expected to complete by summer 2023.   Work ongoing will
continue as part of the 2023/24 Service Plan. 
Author of Report: Suzanne Wilson, Research and Information Officer
Background Papers: Service Plan Actions 
Service Plan Performance Indicators
Service Performance Indicators
Complaints Monitoring Report 
Ref: SPMAN-524642768-913 
Page 454

Page 455

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 20 JUNE 2023                                                                                                       
SUBJECT: PERFORMANCE REPORT (ECONOMIC GROWTH AND
DEVELOPMENT SERVICES) – PERIOD TO MARCH 2023 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the performance of the service for the period to 31
March 2023. 
1.2 This report is submitted to Council in terms of Section III (A) (4) of the
Council's Scheme of Administration to monitor performance of the services
within the Committee’s remit in accordance with the Council’s performance
management framework.  
2. RECOMMENDATION 
2.1 It is recommended that Committee: 
(i) Scrutinises performance in the areas of Service Planning, Service
Performance and other related data to the end of March 2023; and 
(ii) Notes the actions being taken to improve performance where
required. 
3. BACKGROUND 
3.1 On 7 August 2019, the Moray Council, approved a revised Performance
Management Framework for services (para 5 of the minute refers).   
4. SERVICE PLANNING 
4.1 Each service plan sets out the planned strategic and service level priorities
and outcomes it intends to deliver in the coming year aligning closely with
financial planning, corporate and community planning partnership strategic
priorities. This report provides an interim update on progress on the service
plan, key outcomes and performance indicators. The Committee is invited to
review progress to secure assurance that it is satisfactory and to provide
scrutiny and further direction where performance requires attention.
Item 10
Page 455

Page 456

4.2 The narrative included is by exception, links to Service Plan Actions and
Performance Indicators can be accessed within the Backing Papers of this
report. 
4.3 Initial publication of 2021-22 Local Government Benchmarking Framework
Indicators (LGBF) in February 2023 will be refreshed in June.  The full suite
can be viewed using the My Local Council tool.  Published indicators for this
service have been incorporated within the relevant section of this report
depending on whether results are used to evidence progress against
strategic, service plan or service performance priorities. 
Strategic Outcomes - successes 
4.4 Nothing to report. 
Strategic Outcomes – challenges and actions to support 
4.5 Nothing to report 
Service Level Outcomes – successes 
4.6 Environmental Health resources have been significantly impacted throughout
the pandemic response.  As the service recovers, a reset of inspection and
other work programmes has completed ensuring that current resources are
SERVICE PLAN PRIORITIES RAG  
STRATEGIC
LEVEL
Partnership Apprenticeship Strategy
and action plan produced 100%     
SERVICE
LEVEL
Recover service from the pandemic
response to meet statutory
requirements: Environmental Health
and Trading Standards
100%
Manage increased work-related
demands across the existing service
resources: Development
Management and Building
Standards
100%
Recover from pandemic to enable
delivery of economic recovery plan
and develop strategic response to
new funding opportunities and
responsibility for employability
100%
Report annually on Economic
Recovery Plan 95%  
Manage workloads across the
service to progress major work with
the LDP 2025 and new legislative
requirements 
80%  
Workforce development /
succession planning  50%      
OVERALL PLAN PROGRESS 89%      
3
01
14
1
SERVICE PLAN PI'S
Above Target
Within Target
Below Target
Data Only
Data not
available
19
Page 456

Page 457

sufficient to meet regulatory requirements.  (ACTION: EGD23-5.1a-b
INDICATOR: ENVDV087) 
4.7 Actions contributing to developing a strategic response to funding
opportunities have completed as planned.  The Scottish Government
Regeneration Capital Grant Fund supports locally developed, place-based
regeneration projects that involve local communities, helping to tackle
inequalities and deliver inclusive growth; an application for Lossiemouth 2-3
Group was approved and secured £270k, marking the first success for Moray
with this fund. (ACTION: EGD23-5.3a) 
4.8 Supporting the Routemap to Net Zero, a Hydrogen Strategy for Moray was
approved by this Committee on 6 September 2022 (para 10 of the Minute
refers).  A successful funding bid from the Just Transition Fund has allowed
feasibility studies on potential projects resulting from the Strategy to progress. 
In addition, research has been commissioned to investigate opportunities for
carbon sequestration of council land holdings and expand and manage land
holdings to maximise these, findings to be reported upon completion.
(ACTIONS: EGD23-5.4b(ii), 5.4b(iv)) 
Service Level Outcomes – challenges and actions to support 
4.9 Following the re-opening of the Business Gateway office, there has been an 
increase in the number of walk-in enquiries, however in the year ended March 
2023, the number of new start-ups, at 107 remains below the target of 130, 
partly due in the latter half of the year to having just one Business Adviser in 
post. This has recently been resolved with the redeployment of the
Community Wealth Building Officer to the post in June 2023.  Latest
benchmarking results for 2021/22 report 12.65 business gateway start-ups per
10,000 population, below the national average and ranked 26th against all
Scottish local authorities, a position that is unlikely to improve given this year’s
performance. (ACTION: EGD23-5.3b INDICATORS:  ENVDV266,
SECON05) 
4.10 The annual Local Development Plan delivery report on progress against
actions and milestones is in preparation and submission to this Committee is
anticipated by December 2023. (ACTION: EGD23-5.4a) 
4.11 The Joint Energy from Waste project, originally expected to be operational by
March 2023, is now scheduled for completion by summer 2023.  Hot
commissioning commenced in February with waste from Aberdeen City and
Aberdeenshire Councils delivered to site.  Deliveries from Moray are expected
in the near future.  (ACTION: EGD23-5.4b(iii)) 
4.12 The Improvement Service have confirmed that the rationale for measuring the
investment in Economic Development and Tourism per 1,000 population is
that a council’s continued investment in direct economic development
activities achieves significant outcomes, where a ranking of 1 represents the
highest investment level per 1,000 population.  In Moray investment per 1,000
population totalled £53,540, albeit an improvement on the previous year, this
remains significantly below the national average of £119,486 per 1,000
population.  It is expected that Moray’s expenditure will increase in future
Page 457

Page 458

years as delivery of the Moray Growth Deal accelerates.  (INDICATOR:
SECON06) 
5. SERVICE PERFORMANCE 
5.1  In line with the Performance Management Framework, operational
performance is reviewed quarterly by departmental management.  Areas
performing well and/or areas subject to a decreasing trend or where
benchmarking results show performance significantly below comparators will
be reported to this committee for member scrutiny.   
5.2 The narrative included in this report is by exception, links to Service
Performance Indicators can be accessed within the Background Papers of
this report. 
Operational Indicators - successes 
5.3 The percentage of building warrants and amendments issued within
timescales continues to be exceed target year on year. (INDICATORS:
ENVDV-BS-KPO1(B), ENVDV-BS-KPO1(C))   
Operational Indicators - challenges and actions to support 
5.4 A total of 88 (5.87%) unemployed people were assisted into work from
Council operated / funded Employability Programmes, below the national
average of 19.57% but an improvement on the previous year’s result of 54
unemployed people (2.7%) due in part to a reduction in the unemployment
count model based denominator by around a quarter.  A suite of employability
services are being delivered through the Local Employability Partnership Plan
using Scottish Government and UK Shared Prosperity Funding (INDICATOR:
SECON01) 
5.5 Access to good digital infrastructure is a key driver of economic
competitiveness and productivity.  85.6% of residential and non-residential
properties in Moray receive superfast broadband, below the national average
of 94.1%.  This is consistent with the majority of rural local authorities due to
the higher costs of infrastructure provision.  The Scottish Government’s R100
scheme, focussed upon providing full fibre connectivity, should ensure this
4
10
23
8
SERVICE PERFORMANCE PI'S
Above Target
Within Target
Below Target
Data Only
Data not
available
36
Page 458

Page 459

percentage increases in the years ahead as the network is rolled out.
(INDICATOR: SEON08) 
6. OTHER PERFORMANCE RELATED DATA 
Complaints & MP/MSP Enquiries  
6.1  In line with the Performance Management Framework, complaints are
reviewed quarterly by departmental management in terms of time taken to
respond, outcome and learning points. Links to complaints tables can be
accessed within the Backing Papers of this report. 
6.2 A total of 7 complaints were closed in the half year to March 2023 of which 2
(28.6%) were frontline stage and 5 (71.4%) were investigative stage. None
were upheld or partially upheld.  As a comparison, in the same period last
year, 14 complaints were closed. 
6.3 A total of 21 MP/MSP enquiries were received during the second half of
2022/23 out of 225 in total (9.3 %) and 20 of these were resolved. 
Other Performance (not included within Service Plan) 
6.5 Nothing to report. 
Case Studies 
6.6 The service has to remain dynamic to address issues as they arise, such
actions are often not in Service Plans or the Corporate Plan but require a
response and action to remove barriers to economic growth. An example of
this can be seen in the work being carried out by the short life working group
on child care established by Moray Economic Partnership and being led by
the Council’s Strategic Planning and Development service. Although the
service has no direct role in child care provision the leadership being provided
to the short life working group to enable solutions to be developed has been
essential to address an issue of market failure with multiple factors influencing
provision. 
Consultation and Engagement 
6.7 Nothing to report 
7. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Performance measurement is used to ensure the efficient and
sustainable delivery of services to meet the Council’s priorities in both
the Corporate Plan and the LOIP. 
(b) Policy and Legal
The Council has a statutory requirement to publish a range of
information that will demonstrate that it is securing best value and assist
Page 459

Page 460

in comparing performance both over time and between authorities where
appropriate. 
(c) Financial implications
None. 
(d) Risk Implications
None. 
(e) Staffing Implications
Succession planning remains an area that solutions need to be
developed for, particularly in relation to professions where there is a
national shortage such as Environmental Health and this matter will be
brought to Committee for consideration in due course. 
(f) Property
None. 
(g) Equalities/Socio Economic Impact
An Equality Impact Assessment is not required as this report is to inform
the Committee on performance. 
(h) Consultations
The Head of Economic Growth & Development Services, Depute Chief
Executive (Economy, Environment & Finance) and Service Managers,
have been consulted with any comments received incorporated into this
report. 
8. CONCLUSION 
8.1 As at 31 March 2023 the plan overall is 83% complete with planned work
in three priority work areas having been delivered. 
Author of Report: Christopher Dewhurst, Research & Information Officer
Background Papers: Service Plan Actions 
Service Plan Performance Indicators 
Service Performance Indicators 
Service Complaints
Ref: SPMAN-813460984-383 
Page 460

Page 461

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 20 JUNE 2023 
SUBJECT: MORAY COMMUNITY WEALTH BUILDING STRATEGY AND
ACTION PLAN 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To present to committee for approval the draft Moray Community Wealth
Building Strategy (CWB) as set out in APPENDIX 1 ahead of public and
stakeholder consultation. The final strategy and action plan will be reported
back to this committee at its meeting on 5 September 2023, following the
consultation. 
1.2 This report is submitted to Committee in terms of Section III (F) (2) of the
Council's Scheme of Administration relating to the exercise of functions that
promote economic development. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee:- 
(i) approves the draft Moray Community Wealth Building Strategy
and Action Plan as set out in Appendix 1; and 
(ii) agrees that the final strategy be reported back to this committee
at its meeting on 5 September 2023, following the consideration of
issues received via a 6 week public consultation period. 
3. BACKGROUND 
3.1 The CWB approach aims to retain wealth within the local economy, through
restricting extractive practices and placing increased control and benefits in
the hands of local people. CWB is constructed around five pillars:
• Spending - Using public spend to deliver community benefit, fair work
and build local supply chains.
Item 11
Page 461

Page 462

• Workforce - Ensuring the workforce are in well paid jobs that benefit
from an effective voice, security and flexibility.
• Inclusive Ownership - Stimulating the development and growth of
locally owned enterprises that generate community wealth.
• Land and Property - Ensuring that communities maximise benefit and
generate wealth from local land and property. 
• Finance - Ensuring that the flows of wealth generated within the local
economy works for the wellbeing of communities and businesses. 
3.2 The Scottish Government has embedded CWB within its approach to
economic development within both the National Strategy for Economic
Transformation (NSET) and National Planning Framework 4 (NPF4). The
Scottish Government’s vision for Scotland is to create a Wellbeing Economy
based around an economic model that prioritises the collective wellbeing of
current and future generations.1 
3.3 Demonstrating its commitment to the CWB approach, the Scottish
Government has published a CWB consultation paper to capture the views of
national and local stakeholders ahead of bringing forward a CWB Bill. The
consultation, which closed on 9 May 2023, sought to capture views of the
extent to which a CWB duty should be imposed upon public bodies and
specific comments on each of the CWB pillars. A corporate Officer Response
has been submitted to this consultation on behalf on the Council. The Officer
Response has been uploaded to CMIS as an additional meeting document. 
3.4 Locally, Moray Economic Partnership (MEP) have committed to the CWB
approach within the Moray Economic Strategy 2022-2031, setting a
strategic outcome on “maximising the environmental, social and economic
benefits of the transition to net zero and Community Wealth building.” 
4. APPROACH IN OTHER LOCAL AUTHORITIES 
4.1 In May 2020, North Ayrshire Council became the first Council in Scotland to
adopt CWB with the aim of creating a fairer local economy that will tackle
poverty and inequality and embed a new economic model focused on
wellbeing and inclusion. Some key outputs of the strategy have been:
• 33% reduction in the percentage of people earning less than the real
living wage 
• Approval of a two Solar Photovoltaic farm at former landfill sites 
• A new ‘Quick Quote’ procurement process within the council to provide
opportunities for local businesses to win work with the council. 
4.2 The Scottish Government has since supported the development of five CWB
pilot areas, in Clackmannanshire, Fife, Glasgow City Region, South of
Scotland and the Western Isles. 
1 Scottish Government, Creating a Wellbeing Economy
Page 462

Page 463

5. MORAY COMMUNITY WEALTH BUILDING STRATEGY 
5.1 At its meeting on the 28 October 2020 Moray Council approved provision of
funding to recruit a CWB Officer to lead on the development and
implementation of a CWB Strategy as part of the Economic Recovery Plan
(Paragraph 16 of the minute refers). 
5.2 To support the development and implementation of the Strategy a Moray
Anchor Network (MAN) has been formed, as approved by this Committee on
the 19 October 2021 (paragraph 12 of minute refers). The MAN consists of
representatives from the public, private and third sector including Moray
Council, NHS Grampian, Health and Social Care Moray, UHI Moray,
Highlands and Islands Enterprise (HIE), Cairngorm National Park Authority,
Crown Estate Scotland, tsiMORAY, Ekopia Resource Exchange, Moray
Chamber of Commerce, and Scottish Fire and Rescue Service. However, the
Scottish Fire and Rescue Service, RAF Lossiemouth and 39 Engineer
Regiment Kinloss have stated that while they are keen offer support for the
CWB approach, they are unable to commit to the actions within the strategy
as they are subject to a decision making process outwith Moray. 
5.3 To support development of the strategy, a series of workshops were held in
partnership with the Centre for Local Economic Strategies (CLES), with
representatives of the Third Sector, Public Sector and Private Sector. 
5.4 The initial focus for CWB was to target an increase in local public spend. To
demonstrate the potential for growing spend with Moray, the chart below
provides a comparison between the Council and three other rural authorities
which have seen the largest growth in local spend over the past ten years. As
the graph demonstrates, local spend across Scotland as a whole has been
trending upwards from around 26% in 2011 to over 29% in 2021. Over this
same period, Moray Council’s local spend has trended downwards from
above 28% at the start of the last decade to just under 22% in 2020. However,
the potential to improve the position in Moray is showcased by the success of
Fife Council, Dumfries and Galloway Council, and Falkirk Council. All three
had a local spend percentage lower than Moray’s in the early years of the
chart below, but now find themselves significantly above Moray, with local
procurement spend ranging between 34% and 37% of their total. 
Page 463

Page 464

5.5 Activity aimed at increasing the proportion of local procurement spend within
Moray has already progressed, with procurement representatives from Moray
Council, HIE, UHI Moray, and NHS Grampian joining a rejuvenated Supplier
Development Forum. This group aims to identify future public contract
opportunities and promote these to local suppliers, alongside provision of
support to prepare for and tender for public contract opportunities. 
5.6 The Moray CWB Strategy and Action Plan presented in APPENDIX 1
provides a vision to “create a fair and equal society where our communities
have a greater stake in Moray’s economy”. The strategy is based around the
five pillars of Community Wealth Building to enable greater retention of wealth
within the region. The aims of the strategy behind these pillars are as follows:
• Spending – Embed a local first approach to procurement within Moray
where more wealth is retained locally, benefitting our local workforce
and reducing our carbon footprint.
• Workforce – Through investing in our current and future workforce, we
want to remove barriers to employment by providing learning and skills
development opportunities, increase access to career pathways and
ensure our workforce are paid a fair wage.
• Inclusive ownership - Support small businesses, community
organisations, social enterprises, and co-operatives to have a greater
stake in the economy, with increased ownership and control of assets,
to retain and circulate wealth within our communities.
• Land & property - We will work with key departments within Moray
Council and our anchor partners to ensure communities maximise
benefit and generate wealth from local land and property.
• Finance - Capitalize on opportunities for public and community
investment in local development proposals. 
Page 464

Page 465

6. DELIVERY AND MONITORING OF THE STRATEGY 
6.1 The newly created MAN will report into the CPP through MEP and progress
on the strategy will be reported annually to this committee and the CPB.
Delivery of the Strategy will be monitored by officers within the Economic
Growth & Regeneration section. 
6.2 CWB is embedded within NPF4 through Policy 25. The CWB Strategy will
serve as the driver for delivering on this policy within future development
proposals in Moray, including energy infrastructure. This will include
maximising the delivery of community benefits, encouraging the use of local
supply chains, and supporting job creation, new business start-ups, and
community ownership. 
6.3 The Key Performance Indicators for the strategy which will be monitored to
evidence the effectiveness of the strategy are outlined below, with a full
baseline for each presented within APPENDIX 2:
• Percentage of Anchor procurement spend with Moray based
businesses
• Percentage of Anchor procurement spend with the third sector
• Proportion of people earning less than the Living Wage
• Median earnings in pounds for employees living in Moray
• Gender pay gap
• Number of Foundation, Modern and Graduate Apprenticeships
• Number of Community Asset transfer requests approved & completed
• Percentage of contracts commenced during the year which have a
community benefit 
7. PUBLIC CONSULTATION 
7.1 Following its approval, the draft strategy and action plan will be subject to a 6
week public and stakeholder consultation. The draft strategy will be made
available for comment via the Council’s website and will be shared with key to
internal and external stakeholders, with comments invited by 7 August 2023. 
Responses received and any amendments proposed will be incorporated
within the final strategy, which will be reported back to committee at its
meeting on 5 September 2023. 
8. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The Strategy and Action Plan aim to support the corporate plan priority
of promoting economic development and growth, as well as delivering on
the LOIP priority of a growing and sustainable economy. 
Page 465

Page 466

(b) Policy and Legal
The draft CWB Strategy and Action Plan links to objectives embedded
within National policies of NSET, Fair Work, NPF4 and the future
implementation of the CWB Bill as set out in the strategy document. 
The Council considers support for economic development issues on their
merits, against the objective to facilitate sustainable economic growth
and the desired outcomes of the LOIP and Corporate Plan.   
(c) Financial implications
There are no financial new or additional implications arising directly from
this report of the approval of the draft strategy. 
(d) Risk Implications
CWB requires an alternative perspective on risk that balances financial
cost with socioeconomic and environmental impact. Moray has an
opportunity to be a step ahead of many other authorities in adopting this
approach. 
With the Scottish Government in the process of preparing a CWB Bill,
the likelihood is that other local authorities will adopt CWB practices to
strengthen their local markets and grow their business bases. It is key
that Moray businesses are provided with the same opportunity to ensure
the economy does not find its economic position weakened with
increased leakage of local spend, as suppliers from outwith the area are
upskilled in tendering for public contracts and supply chain participation.
However, the strategy and actions take a proportionate approach to
delivering upon this in light of current resource availability and ahead of
national legislation being adopted. 
(e) Staffing Implications
There is no longer a dedicated CWB Officer post. However, coordination
and monitoring of the strategy will be led via existing staff resource within
Economic Growth & Regeneration. Delivery of the actions will require the
support and commitment of officers across a range of internal services,
including Procurement, Strategic Planning & Development and
Education, Resources & Communities, including contract managers. As
well as the support of key external partners. 
(f) Property
A key element of CWB is to work with key departments within Moray
Council and Anchor partners to ensure communities maximise benefit
and generate wealth from local land and property. The implementation of
the CWB Strategy and Action Plan will look to: 
• Facilitate use of public assets to support the needs of the
community by maximising the use of outdoor space for community
benefit and promoting the availability of vacant, underused public
assets. 
• Assist local communities to take ownership of vacant or
underused public assets by continuing to support communities
through the Community Asset Transfer (CAT) process. 
Page 466

Page 467

• Embed community benefit requirements into local planning policy
by implementing CWB planning guidance for all upcoming major
developments including wind farms and maximise local impact of
Developer Obligations to support skills development opportunities
and provide community infrastructure, linked to NPF4 Policy. 
(g) Equalities/Socio Economic Impact
The proposed actions aim to promote equality and growth in the local
economy through the development and implementation of a CWB
approach. The vision of the draft CWB Strategy is to “create a fair and
equal society where our communities have a greater stake in Moray’s
economy”. 
(h) Climate Change and Biodiversity Impacts
There are no biodiversity issues arising directly from this report.
However, actions aimed at addressing the climate crisis share many
synergies with the CWB approach. It is highly likely that increasing local
spend through Progressive Procurement will have a positive impact the
Council’s carbon output, through reduced transport and logistics
emissions. Furthermore, activities which address the drive towards
Socially Just Use of Land and Property will support both the social
justice and environmental justice agendas. 
(i) Consultations
The Moray Community Wealth Building Strategy and Action Plan has
been subject to the consultation of CMT/SMT with comments received
incorporated within the draft strategy presented to committee. 
The Depute Chief Executive (Economy, Environment and Finance), all
Heads of Service, the Legal Services Manager, the Strategic Planning
and Development Manager, the Economic Growth and Regeneration
Manager, the Communities Service Manager, the Principal Climate
Change Officer, the Equal Opportunities Officer and Lissa Rowan
(Committee Services Officer) have been consulted on this report with
their comments incorporated. 
9. CONCLUSION 
9.1 Development of the Moray Community Wealth Building Strategy has
been a key component of the Economic Recovery Plan for Moray, while
also supporting the strategic objectives of the Moray Economic
Strategy. 
9.2 CWB provides an opportunity to take a strategic approach to addressing
some of the long standing economic challenges which Moray faces.
Including the lack availability of a sufficient working age population, the
low wage economy, and gender pay inequalities. The committee is
presented with this strategy and the opportunity to embed a new
socioeconomic approach within the ways of working across the Council
– and the community planning partners – to support delivery of an
economy that works for all. 
Page 467

Page 468

Author of Report: Shannon Creswell, Community Wealth Building Officer 
Background Papers: 
Ref: SPMAN-813460984-352 
SPMAN-813460984-353 
SPMAN-813460984-355
Page 468

Page 469

Moray Community
Wealth Building
Strategy 2023
DRAFT
Item 11
Page 469

Page 470

Page 470

Page 471

Contents   
1. Foreword from chair 
2. Introduction 
3. Policy Rationale 
4. Moray Profile 
5. Community Wealth Building Vision 
6. Delivery 
7. Communication 
Appendix
1Moray Community Wealth Building Strategy
2
3
5
7
8
26 
27 
28 
Page 471

Page 472

2 Moray Community Wealth Building Strategy
1. Foreword from chair
Community Wealth Building (CWB) is a
pioneering approach to economic
development that looks to build an
economy that focuses on the wellbeing
of local people, communities and
businesses.  The success of the CWB
approach has already been
demonstrated in multiple local
authorities across Scotland and the UK,
most notably North Ayrshire and
Preston. With the Scottish Government
having committed to CWB by embedding
it within policies such as the National
Planning Framework 4 (NPF4) and the
National Strategy for Economic
Transformation (NSET), we must grab the
opportunity it offers in developing a
wellbeing economy in Moray. 
The impacts of COVID-19 and the cost of
living crisis are causing prominent stress
on our businesses, public services and
communities.  Now is the time to rethink
our current economic approaches
towards one which puts an emphases on
the retention of wealth and skills within
our local communities.   
Working together, our network of Anchor
partners will use their collective power to
deliver positive economic and social
outcomes for our local communities. The
five pillars which underpin this strategy
are; Spending, Workforce, Inclusive
Ownership, Land & Property and
Finance. The aims, objectives and actions
identified under each pillar have been
informed by engagement with key
partners and in consultation with the
community to ensure this is an approach
that is catered towards Moray. 
In this strategy we have tried to
showcase existing projects in Moray that
are driving forward Community Wealth
Building as well as celebrating case
studies from other local authorities and
groups from across the UK. 
To ensure the successful implementation
of this strategy, the delivery of the action
plan will be reported to the Anchor
Network, Moray Economic Partnership
and the Economic Development &
Infrastructure Committee at Moray
Council on an annual basis and
monitored regularly by officers within
Moray Council. 
It gives me great pleasure to be Chair of
the Moray Anchor Network and support
the implementation of the Moray
Community Wealth Building Strategy. 
Councillor James Allan.
Page 472

Page 473

2.1 What is Community Wealth Building? 
Community Wealth Building (CWB) is a place based approach that looks to alter
local economic thinking by focusing on retaining and recirculating wealth within
local communities.  Since its emergence, CWB has been a significant and
growing movement with a number of councils across the UK embedding this
economic approach to build an inclusive economy that delivers increased
opportunity for local people.   
CWB is based around five core principles that are designed to enable and
unleash the potential of the local economy. A visual representation of these
pillars is highlighted below. 
3Moray Community Wealth Building Strategy
2. Introduction
WORKFORCE
Ensuring the workforce 
are in well paid jobs that
benefit from an effective
voice, security and
flexibility
INCLUSIVE
OWNERSHIP
Stimulating the
development and
growth of locally 
owned enterprises that
generate community
wealth
LAND AND
PROPERTY
Ensuring that
communities maximise
benefit and generate
wealth from local land
and property
SPENDING
Using public spend 
to deliver community
benefit, fair work 
and build local 
supply chains
FINANCE
Ensuring that the 
flows of wealth
generated within the
local economy works for
the wellbeing of
communities and
businesses
Page 473

Page 474

4 Moray Community Wealth Building Strategy
2.2 Anchor Institutions
Anchor Institutions such as local authorities, health and social care bodies,
further and higher education bodies and enterprise agencies are central to the
success of CWB. Anchor Institutions, are typically large established
organisations, rooted in local communities, which can improve local economic
and social wellbeing through their procurement, jobs and use of land and
assets. Not only is the public sector key to the success of CWB, but the private,
third sector and community organisations all play a vital role in the
implementation of CWB policies. 
A Moray Anchor Network has been established, consisting of cross sector
partners, including Moray Council, NHS Grampian, Health and Social Care
Moray, UHI Moray, Highlands and Islands Enterprise, Cairngorm National Park
Authority, Crown Estate Scotland, tsiMORAY, Ekopia Resource Exchange, Moray
Chamber of Commerce, and Scottish Fire and Rescue Service. 
The Moray Community Wealth Building Strategy has been developed by
engaging with partners through the Moray Anchor Network and Community
Planning process. 
Page 474

Page 475

3.1 Scottish Government
The Scottish Government has adopted the CWB approach to economic
development as a key practical means by which they can achieve their wellbeing
economy objectives outlined in the National Strategy for Economic
Transformation (NSET).1 
The Scottish Government has brought forward a CWB Bill for consultation in
early 2023.2  The bill will be targeted towards delivering inclusive growth,
through promoting fair work, tackling inequality, and creating sustainable
communities that foster wellbeing. This legislation will attempt to address
blockages identified in the implementation of CWB and support further
embedding of this approach, building on the good practice already underway. 
National Planning Framework 4 
CWB is identified as a central policy for developing
productive places within National Planning Framework 4
(NPF4), with the approach seen as key in supporting
delivery of national outcomes around fair work, business,
economy, poverty, and communities. Building community
wealth should be founded on an assessment of local
assets in partnership with communities. The CWB policy
within NPF4 promotes economic development that
focuses on community and place benefits to support local
employment and supply chains. It also endorses
community ownership of local assets. This strategy will
serve as the driver for building community wealth through
development proposals, encouraging increased investment in local
communities; promoting use of local supply chains and, supporting the creation
of local jobs to help Moray attract and retain the best talent. 
5Apprenticeship Strategy
3. Policy Rationale
1 https://www.gov.scot/policies/cities-regions/community-wealth-building/ 
2 https://edas.org.uk/2022/06/15/scotland-the-brace-community-wealth-building-makes-
national-progress/
Page 475

Page 476

6 Moray Community Wealth Building Strategy
Fair Work 
The Scottish Government has the ambition of becoming a Fair Work Nation by
2025. In December 2022, Scottish Government released an action plan to
promote fair and inclusive workplaces across Scotland. This action plan
recognises that Fair Work is central to delivery of the workforce pillar in CWB,
and will be referred upon in the implementation of the Moray CWB Strategy. 
The aims behind this action plan include; ensuring workers have effective voice
channels, increasing the number of people earning the Real Living Wage and
number of Living Wage accredited employers, implement anti-racist
employment strategy and reduce the gender pay gap. 
3.2 Moray
Community Wealth Building is an approach that will influence the priorities of
various Moray strategies including the Local Outcome Improvement Plan,
Corporate Plan, Moray Economic Strategy, Social Enterprise Strategy,
Apprenticeship Strategy, Local Development Plan and Climate Change Strategy.
These strategies will be referenced throughout the Community Wealth Aims
section of this document. 
Page 476

Page 477

7Moray Community Wealth Building Strategy
4. Moray Profile
Moray benefits from a wealth of natural assets, low crime rates and healthy
communities. However, there are pockets of inequality, deprivation and poverty
within Moray’s communities. In order to deliver a CWB strategy that works for
Moray, it is important to evaluate the main underlying strengths and challenges
in Moray.  The following statistics are largely for 2021 / 22: 
Childcare
Inadequate provision of pre-
school and wraparound
childcare in Moray.  
Gender Pay Gap 
Gender pay gap of 22.1%
higher than the Scottish
average of 11.1%.
Low Wage Economy
Average weekly full time wage
of £598.80 – which is the fifth
lowest in Scotland and is 6%
lower than Scottish average
and 8% lower than the local
average. (Aberdeen,
Aberdeenshire, Moray and
Highlands).
Underemployment
Underemployment rate of
9.3% exceeding the Scottish
average of 8.5%.
Female Entrepreneurship
Female Self Employment rate
of 8.6%, one of the highest
rates in Scotland.
Social Economy 
Thriving third sector with 147
Social Enterprises.
Moray Growth Deal
£100m deal that is delivering
Pioneering projects that can
embed Community Wealth
Building in their delivery.
Just Transition 
£500 million ten-year
commitment that will support
projects in the North East and
Moray which contribute
towards the region’s
transition to net zero.
Skills Availability
Economically active skilled
young people are in lower
proportions than Scottish
average.
Ageing population
By 2039 the working age
population in Scotland is
projected to increase by 1%
but in Moray it is projected to
fall by 3%.
Economic Activity 
Economic activity rate of
79.1%, higher than the
Scottish average of 77.2%.
Visitor Economy
The Visitor economy
generated £96.17m in
economic impact and
supported 1,840 FTE's during
2021.
£
Page 477

Page 478

8 Moray Community Wealth Building Strategy
5. Community Wealth Building Vision
This strategy sets out a ten year plan to support existing activities and create new
policies that ensure wealth stays within the hands of our local communities. An action
plan to deliver this strategy is located in the appendix of this document. 
The vision of 
“creating a fair and equal society
where our communities have a
greater stake in Moray’s economy”   
will provide a focus on priorities around People, Place and Planet. The Wellbeing
economy principles will underpin the strategy for CWB with a focus on creating an
economy that is inclusive, fair and kind to our environment. 
5.1 Spending 
Embed a local first approach to procurement within
Moray where more wealth is retained locally, benefitting
our local workforce and reducing our carbon footprint.
AIM
Spend with Moray
Based Suppliers 21/22
Moray Council Statistics
Page 478

Page 479

9Moray Community Wealth Building Strategy
Procurment Analysis
With a substantial annual spend figure of over £415 million3, Anchor bodies in Moray
have a powerful influence on the growth of the local economy. Current 21/22 local
spend statistics for Moray Council, HIE, NHS Grampian, and UHI Moray are
highlighted in the infographic above. From the previous year, Moray Council has
increased it’s spend in excess of 2%. The value of local spend from HIE and NHS
Grampian has remained broadly consistent from the previous year. Spend data for
UHI Moray was not provided for 2020/21, so a comparison is not possible. The
aspiration for Moray is to grow local procurement spend annually, across all public
anchors who have a presence in the area. An aspiration for Moray Council is to grow
local spend from the five year rolling average of 23.96% to 27% within five years and
then to 30% over the ten year period the strategy.  This ambition should be feasible
for Moray Council, based on previous performance and the success of other
comparable Councils in achieving similar levels of growth in recent years. This will be
measured over this longer period of time to account for the development work
needed in the local supply chain. Procurement methods and the drive for savings in
Public Sector organisations has resulted in lower levels of local spend for certain
commodities, however there are also examples such as Moray Council’s Fresh Meat
Catering contract that followed a CWB approach supporting local producers and
suppliers and delivering best value. Continuing financial constraints across the public
sector will continue to drive the need for savings, but this must be balanced with the
benefits that a CWB approach brings. 
Noting the importance of a adopting a CWB approach to aid economic recovery from
COVID, Moray Council approved the development of a CWB strategy for Moray. It was
agreed that the initial CWB focus in Moray would be in reducing leakage from the
local economy through public procurement spend. Provision of 1-2-1 consultancy
support was included as part of this recovery package, to assist local small businesses
in the preparation of tender bids. 
Further activity aimed at increasing the proportion of local procurement spend has
also seen a local  Supplier Development Forum reinvigorated, consisting of
procurement officers from Moray Council, Highlands and Islands Enterprise, and NHS
Grampian alongside other key stakeholders. This group has met to explore how best
to raise awareness of local procurement opportunities and coordinate support
available to access these. 
Service Models
The public sector has a variety of service models which include outsourcing, shared
service, collaborative and cooperative models of delivery. The reasons for one type of
delivery over another can be many and varied depending on political ideology or
simply the scale of service provision and geography of delivery, all decisions are taken
to ultimately provide best value at the time. While design of service models should
not be thought about in isolation, a CWB approach should consider the wellbeing
economy, fair work and retaining local wealth. 
3 For year 21/22
Page 479

Page 480

10
As highlighted by Centre for Local Economic Strategies (CLES), “Insourcing can deliver
real benefits through better governance, better service integration, more sustainable
operations, and ultimately higher quality service provision for end users.”4  This is
backed up by a report conducted by ASPE which notes that “Services have been
insourced as part of a local authority drive for quality service provision and value for
money”5 the same report also noted the local economic impacts of insourcing in
developing stronger local supply chains and local employment. There will always be
occasions where outsourcing or shared services make sense e.g. Moray Council has
shared services with Aberdeen and Aberdeenshire for Archaeology Services and
mortuary services which would not be viable if delivered locally, however when making
such decisions CWB should be at the heart of the approach to safeguard community
wellbeing. 
Commitment from local anchors is needed to assess the level of spend with
consultants for services such as legal advice, economic analysis, design, and project
management to assess whether these services may be suitable for insourcing or
shared service where appropriate and feasible to do so and may give rise to more
shared services across the public sector in Moray being delivered from Moray. 
Objectives 
1. Expand delivery of community benefit by embedding across all public procurements
2. Grow the percentage of procurement spend with Moray based suppliers from each
anchor partner
3. Increase Anchor spend with community led and third sector businesses. 
4. Support delivery of Fair Work First through anchor spend 
5. Ensure CWB approach informs decisions on service models
6. Embed CWB approach in strategic activity of Anchor Partners 
Moray Strategy linkages 
Moray Economic Strategy
Moray Council Corporate Plan 
Moray Procurement Strategy 
HIE Procurement Strategy
HIE Strategy 2019-2022
UHI Procurement Strategy 
Crown Estate 2021- 23 Climate Change Action Plan
Crown Estate Scotland Procurement Strategy 2020 - 2023
Moray Council Routemap Net Zero
Moray Council Woodland & Forestry Strategy
Local Development Plan 
4 https://cles.org.uk/what-is-community-wealth-building/the-principles-of-community-wealth-
building/plural-ownership-of-the-economy/insourcing/ 
5  Insourcing: A guide bringing local authority services back in house
Page 480

Page 481

11Moray Community Wealth Building Strategy
Case Studies 
Supplier Development Forum
Reformed in September 2021, the Supplier Development Forum aims to provide
coordinated support for local enterprises to access public sector procurement
opportunities – resulting in increased procurement spend within Moray from local anchor
institutions. The Forum brings together officers working in Procurement, Economic
Development, Business Development, and Community Development across the four local
public anchor institutions; Moray Council, Highlands and Islands Enterprise, UHI Moray and
NHS Grampian with support from Business Gateway and tsiMORAY. This group will actively
identify opportunities for local procurement and provide support to stimulate the local
market to access these. 
Supplier Development Forum Strategy will be developed in 2023, and will target four key
improvement areas; 
To reduce any influences that create barriers to Moray Suppliers 
To help local businesses to grow and increase trading ability
To increase the amount of local businesses with e-Commerce capability
To improve local supply chain potential 
Preston 
Since implementing a CWB approach in 2013 that focused on progressive procurement,
social value, democratising the economy and implementing the Preston real living wage,
spending behaviour within public bodies has been transformed; and, new tools for a fairer
economy have been developed. 
The public impact of the community wealth building efforts in Preston was significant, in 2016,
three years after the initiative started, public service spending in the local community had
gone up by GBP74 million in Preston and by GBP200 million in the wider Lancashire area6 
Wigan’s Ethical Homecare Framework 7
In 2020, Wigan launched their vision for CWB to create a fairer local economy that works
for all the people of the borough. Wigan’s area of focus included The Wigan Pound, good
jobs, housing, green jobs and working with businesses. 
One of the key CWB focused projects was the Wigan Ethical Homecare Framework, which
wanted to deliver a transformational and ethical model of home based care that was
delivered by local people who benefitted from fair employment practices. The system prior
to this was delivered by providers who were disconnected from local communities with a
poorly compensated workforce. 
To ensure the framework was successful and collaborative, the council worked with the
providers to co-create a model that was affordable and sustainable as well as being
mindful of profit for local enterprises.   
Overall, the Wigan’s Ethical Homecare Framework has driven up employment standards,
reformed the economy of the care sector in the Borough and supported the development
of more than 100 social enterprises.     
6 The Preston Model of Community Wealth Building in the UK, Centre for Public Impact
7  Ethical Home Care case study 
Page 481

Page 482

12 Moray Community Wealth Building Strategy
5.2 Workforce 
Key Statistics 
Through investing in our current and future workforce, we
want to remove barriers to employment by providing learning
and skills development opportunities, increase access to
career pathways and ensure our workforce are paid a fair
wage.
AIM
Key Statistics Low Wage Economy 
Despite high employment rates, Moray suffers
from a low wage economy with our average full
time wage being £598.80, falling 6% below the
Scottish average.8 The makeup of our economy
is a main contributing factor to this low wage
rate. Moray has a high level of manufacturing
employment which accounts for 17.1% of jobs in
the area compared to just 7.1% in Scotland. In
particular, manufacture of food products and
beverages alone account for 10% of jobs in
Moray.9 
Skill Shortage
By 2039, the working age population in Scotland
is projected to increase by 1% but in Moray it is
projected to fall by 3%. With economically active
young people being in lower proportions in
Moray than the Scottish average means that
access to skilled and available workforce is
restricted. This skill shortage is a huge struggle
for employers as it hinders growth and
sustainability. 
Underemployment
Whilst we have a low unemployment rate of
3.4%10, our rate of underemployment of 9.3% is
high compared to the Scottish average of 8.5%11.
Underemployment is defined as a person aged
16 and over who is in employment and would
like to work longer hours in their existing job,
work an additional job, or find a different job
with more hours. 
Lowest paid
female
workforce in
Scotland
£
8 NOMIS 
9 Moray Economic Strategy 
10 NOMIS 
11 SLAED Indicators Framework Report 2021-22
Page 482

Page 483

13Moray Community Wealth Building Strategy
Work needs to be done to upskill our current workforce, in order for them to
maximise their potential and achieve the job and working hours they desire. Bodies
such as DYW Moray and the Moray Pathways partnership are already delivering
multiple programmes to upskill local people facing employment barriers. 
Gender Pay Gap
The gender pay gap remains a significant issue in Moray, with 2021 statistics
highlighting the rate being at 22.7% which is higher than the Scottish average of 10%.
Statistics also highlighted that women who live in Moray are the lowest paid in
Scotland, earning £477.50 per week while men earn £648.30 per week. Many women
are also out of work, or in low-paid and part time forms of work. The reasons for this
are numerous – from caring responsibilities to childcare availability. However, taking a
community wealth building approach to gender justice will require an integrated
approach and innovative thinking. 
Childcare 
A survey conducted with Moray parents in 2022 through the Parent Employability
Project, received 507 responses and showed that 87% of the parents surveyed were
not satisfied with their childcare solution. Due to the lack of available and affordable
childcare in Moray, women are disproportionately making sacrifices in their careers to
meet caring responsibilities, resulting in financial insecurity, instability and a
significant skills shortage for Moray employers. 
In a report published in 2022, the Institute for Fiscal Studies (IFS) estimated that if
female employees worked as much in full time roles as their male counterparts, the
gender pay gap would reduce by a third. Addressing the gender pay gap matters for
fairness between genders. But as many families depend on a woman’s income, lower
wages for female workers places them and their children at greater disadvantage and
puts them at increased risk of poverty. 
Local anchors and larger employers could adopt a CWB approach to assist in
mitigating the childcare issue by developing parent friendly employment policies and
shift patterns, direct provision of child care or assistance with child places, engaging
with the childcare sector to provide support that will benefit the employee and the
employer in terms of retention and recruitment. Similarly, it is essential that private
and third sector nursery settings remain viable in terms of premises, staffing, training
and development opportunities associated with the fair work principles and land and
property of CWB. 
Workforce Objectives
1. Increase the number of people in Moray benefitting from Fair Work practices. 
2. Help to minimise the systemic barriers to people working such as childcare,
transport and digital connectivity.  
3. Maximise opportunities for providing skills development and training opportunities
for the local workforce including through local development. 
Page 483

Page 484

14 Moray Community Wealth Building Strategy
Strategy Linkages
Moray Pathways Delivery Plan 
Local Outcomes Improvement Plan
Moray Economic Strategy
Moray Council Corporate Strategy 
Moray Council Climate Change Strategy 
Moray Council Early Years Strategy
Moray Local Development Plan 2020
HIE Strategy 2019-2022
Skills Development Scotland Strategic plan 2022-27
NHS Grampian workforce plan 2022-27 
Case Studies 
Moray Pathways
Moray Pathways is the local employability partnership in Moray. Through Moray
Pathways, a programme of employability activities have been launched, through
collaboration with local partners, in support of the Economic Recovery Plan. 
The Moray Pathways Employability and Training Hub at the Inkwell in Elgin opened in
June 2021 through collaboration between Moray Council, Department for Work and
Pensions (DWP), Skills Development Scotland (SDS) and Elgin Youth Development
Group (EYDG). The following outputs were delivered during the first year of the
project: 
500 individuals were engaged and supported by Moray Pathways Network partner
organisations 
124 people progressed into employment opportunities
218 training sessions delivered 
36 partner organisations from the Moray Pathways network delivered support and
training provision within the hub 
51 digital support sessions took place in the hub on a 1:1 basis 
Page 484

Page 485

15Moray Community Wealth Building Strategy
North Ayrshire
In May 2020, North Ayrshire became the first council in Scotland to adopt CWB with
the aim of creating a fairer local economy. In the strategy it sets out how the council
will work in partnership with local communities, businesses and wider regional
anchor institutions to create a fairer local economy that will tackle poverty and
inequality and embed a new economic model focused on wellbeing and inclusion.12
North Ayrshire has made significant impacts on the local workforce as a result of
implementing CWB measures.  Some key outputs of the strategy are: 
Became a Living Wage employer five months earlier than planned. 
Reduction of 33% on the percentage of people earning less than living wage 
Delivery of one of the largest Kickstart programmes in Scotland to support
economic recovery and tackle youth unemployment;
Development of a £500,000 Green Jobs Fund with support from North Ayrshire
Ventures Trust (NAVT) to deliver a green economic recovery. 
Sleepy Hollow Wraparound Childcare 13
Sleepy Hollow Group (SHG) is Northern Ireland’s leading and largest childcare
provision. Addressing the need by the Department of Education that schools provide
the school estate for wraparound and holiday care, SHG works with various schools
across NI to provide this wraparound care. 
Following a social economy model, SHG operational model is that they pay a rental
income to each school, based on the number of children attending and in return the
schools re-invest the money back into the school estate. To support families in need,
SHG subsidise some childcare placements confidentially as referred by each school. 
12 North Ayrshire, Scotlands First Community Wealth Building Council, Scottish Hub for
Regeneration and Development 
13 Sleepy Hollow Wraparound School Aged Childcare  
Page 485

Page 486

16 Moray Community Wealth Building Strategy
5.3 Inclusive ownership 
Support small businesses, community organisations, social
enterprises, and co-operatives to have a greater stake in the
economy, with increased ownership and control of assets, to
retain and circulate wealth within our communities
AIM
14 SLAED Indicators Framework 2021/22
Moray has smaller businesses and slower
rates of business growth than the
national average.  Data sourced from
ONS, BEIS and IPO has ranked Moray
372/374 out of all UK local authorities for
business dynamism due to low R&D rates
and low business density. 
Micro enterprises with less than 10
employees form 88% of all Moray
businesses. Despite a dip in business
start-ups during the pandemic, Business
Gateway have seen this trend reversed
with 123 new businesses supported in
2021/22, up from 91 the previous year. 
The 3 year business survival rate from
2018 to 2021 is 65.5%, which is an
increase from 58.7% from the previous
year.14 This highlights the post pandemic
business recovery where businesses
were unable to handle the debt burden
from the bounce back loans and the
reduction in town centre footfall. 
In Moray, there are 147 social enterprises
with particular hotspots in Forres and
Findhorn. HIE and tsiMORAY have led the
development of a new Social Enterprise
for Moray Strategy. This strategy aims to
support and grow the Social Economy in
Moray, helping to maximise the
environmental, social and economic
benefits of the transition to net zero and
CWB. 
Page 486

Page 487

17Moray Community Wealth Building Strategy
SCVO Third Sector Statistics15 
17/18                            20/21                         Change
Registered charities          464                                547                             +17%
Income                                 25,076,164                   39,160,272                +56%
Expenditure                        21,323,631                   29,656,118                +39%
Paid Staff                             660                                1000                           +34%
Trustees                              2,716                            2804                           +3% 
As highlighted in the table above the Third Sector has grown in scale and output
within Moray over the past 5 years, resulting in a 56% increase in the level of income
generated by local charities. This has also seen the birth of over 80 new registered
charities in Moray. The sector now employs an additional 340 people, compared with
5 years ago, increasing the importance of Moray’s social economy is sustaining the
local labour market. 
However, as also demonstrated by the data, the number of volunteer trustees
supporting the third sector has remained broadly static over this time period. This
reflects reported challenges within charitable organisations at attracting and retaining
volunteers. In many instances, this has resulted in fewer volunteer trustees being
appointed to the board of charities, placing increased risk upon the long term viability
of organisations as existing volunteers are stretched and become burned out. 
There is a need for public anchors to recognise the value of the third sector in
providing essential social care and support services within the local community. This
could include encouraging or incentivising an increase in volunteer activity among
public sector employees. For example, provision of a specified number of volunteer
hours or days on an annual basis, for employees to undertaking volunteer services.
This would not only help recognise the value of the local third sector, but help sustain
its current scale and levels of growth. 
Inclusive Ownership Objectives 
1. Develop existing business support programmes to support the growth of inclusive
forms of business ownership. 
2. Ensure major projects delivered by Moray Anchor Network Partners adopt a
community wealth building approach 
3. Maximise leverage of external funding sources to support community led and
public sector projects. 
4. Increase capacity amongst third sector organisations. 
15 SCVO State of the Sector 2022
Page 487

Page 488

18 Moray Community Wealth Building Strategy
Moray Strategy linkages 
Moray Economic strateg
Moray Local Development Plan 2020 
Moray Council Corporate Plan 
Moray Council Climate Change Strategy 
Moray Council Woodland & Forestry Strategy
Moray Social Enterprise Strategy
HIE Operating Strategy 
Cairngorms National Park Local Development Plan 2020 
Crown Estate Scotland Corporate plan 2020-23
Moray Council Routemap Net Zero
HIE Strategy 2019-2022
TSI Moray Outcomes framework 
Local Development Plan 
Case Studies 
Moray Business Enterprise Hub 
The Business Enterprise Hub, a Moray Growth Deal project, is designed to promote
inclusive economic development in Moray (and the wider region), primarily by
supporting the scale-up of existing small and micro-businesses from all sectors
present in the region, as well as providing support to start-ups, university spin-outs
and inward investors. 
The Hub will offer hot-desking facilities and pre-incubation space for new and growing
businesses, as well as access to meeting rooms, studios, digital equipment and space
for research and development. 
There will be a co-ordinated offer of education, training and research support which
will be agile and responsive to the needs of local businesses, and focussed on
increasing resilience and growth. 
Page 488

Page 489

5.4 Land and property 
19Moray Community Wealth Building Strategy
We will work with key departments within Moray Council and
our anchor partners to ensure communities maximise benefit
and generate wealth from local land and property.
AIM
Key Statistics Fuel Poverty
There is a significant issue of fuel poverty in
Moray influenced by low wages and
inefficient housing. A household is considered
to be in fuel poverty if total fuel costs are
more than 10% of the household's adjusted
net income (after housing costs). The most
recent Scottish House Condition Survey
(SHCS) in 2019, which is used by the Scottish
Government to measure progress on fuel
poverty, estimates Moray had a fuel poverty
rate of 32% compared to the Scottish average
of 24%. 
19% of Moray households compared to the
average in Scotland of 12% are also estimated
to suffer with extreme fuel poverty (where
households would have to spend 20% or
more of adjusted net income to pay for fuel
costs). Inefficient housing is contributing to
the fuel poverty rate with 2020-21 figures
highlighting that only 57.4% of council
housing stock is energy efficient – the lowest
rate of all Councils in Scotland. Addressing
this issue, the Moray Local Heat and Energy
Efficiency Strategy (LHEES) will look to
implement actions to address the heat
efficiency of Moray Council stock. 
The 2019-24 Moray Local Housing Strategy
highlights that there is a continual acute
shortage of affordable housing, driven mainly
by Moray’s low average earnings. This is
despite significant numbers of new build
properties for social rent delivered through
the Strategic Housing Investment Plan. The
Moray Growth Deal Housing Mix Delivery
project aims to address some of these
challenges by looking to support delivery of
up to 300 affordable homes and a number of
private dwellings.
Page 489

Page 490

20 Moray Community Wealth Building Strategy
Community Asset Transfer 
As noted in the Community Asset Transfer (CAT) Annual Report, Moray Council has
long recognised the important role that the transfer of property can play in
empowering communities and strengthening their resilience. The Council’s
Community Support Unit provides support to community groups at all stages of the
CAT process. Where appropriate, the Council will use the transfer of assets to give
more control to communities, helping to inspire them to find local solutions to
community needs and become more sustainable in the long term. Since 2017, 17
CAT’s have been approved, with 11 of those having been completed. 
Land and Property Objectives 
1. Facilitate use of public assets to support the needs of the community. 
2. Assist local communities to take ownership of vacant or underused public assets. 
3. Embed community benefit requirements into local planning policy. 
Strategy Linkages: 
Moray Council Corporate Plan 
Moray Council Climate Change Strategy
Moray Council Local Housing Strategy 2019 – 2024
Moray Council Learning Estate Strategy
Moray Council Active Travel Strategy 
Moray Council Woodland & Forestry Strategy
Moray Council Open Space Strategy 
Moray Council Local Housing Strategy 2019 – 2024
Moray Town Centre Improvement Plans
Elgin City Centre Masterplan
Local Development Plan
HIE Operating Strategy 
HIE Strategy 2019-2022
TSI Moray Outcomes framework
Crown Estate 2021- 23 Climate Change Action Plan
Crown Estate Scotland Corporate plan 2020-23
Cairngorms National Park Local Development Plan 2020
Cairngorms National Park Partnership Plan  2022-27
NHS Grampian Plan for the Future 2022-2028 
Page 490

Page 491

Case Studies 
Marine Park, Lossiemouth 
Since 2011, Action Marine Park were looking to develop and reinvigorate
Lossiemouth’s Marine Park and bring it back to use within the community. In 2018 the
CAT was completed to transfer Marine Park from Moray Councils ownership to the
hands of the community. Around the same time, the group sourced funding from the
Moray Leader Programme, Sport Scotland, EB Planning (Landfill) and the Robertson
Trust to develop the Marine Park Pavilion, which was previously demolished in the
1990s. 
The project was completed in 2020, and offers tennis courts, sports pitches and a
bowling green. The pavilion will benefit and meet the needs of existing user groups,
as well as providing space for indoor community events. Action Marine Park have
many more plans to enhance the park, which will be easier to achieve now the
Pavilion is in place. 
Crown Estate Scotland and Portgordon Community Trust16
In 2021 Crown Estate Scotland signed a MOU with the Portgordon Community Trust
Ltd (PCT), to transfer assets to them in line with their commitment to helping
communities take a greater role in managing local assets. 
This agreement will see the harbour itself – and potentially other property within the
village – pass into the hands of the local community, so that local people can press
ahead with their own plans for the regeneration and development of their village. 
In June 2021 Crown Estate Scotland took a significant step towards helping the
community realise their vision for the area, with the purchase of the former
Richmond Arms in Portgordon. They are in discussions to lease this building to PCT
for their use as a meeting place for community members to gather and progress
plans. 
The MOU is the culmination of several years of work which saw PCT and the wider
community carry out a Planning for Real exercise in 2017, and Crown Estate Scotland
employ consultants to develop options for greater community involvement in
managing the harbour. 
21Moray Community Wealth Building Strategy
16 Crown Estate Scotland Annual Report 2022
Page 491

Page 492

22 Moray Community Wealth Building Strategy
Tomintoul & Glenlivet Development Trust (TGDT)
Development trusts in Moray are looking to address shortfall in affordable housing in
local communities. To address this issue within their community, Tomintoul &
Glenlivet Development Trust (TGDT) with support from Communities Housing Trust,
created a community-led housing project of 12 affordable homes. 
The homes are a mix of affordable rent and discounted sale. The development also
tackles fuel poverty and social isolation, as the homes are designed around a
communal space, and include individual EV charging points, PV panels on each home
to generate electricity, and are highly insulated.17 
This project was funded by Scottish Land Fund, the Scottish Government’s Rural &
Islands Housing Fund, Social Investment Scotland, Highlands & Islands Enterprise, the
Community And Renewable Energy Scheme (CARES) and Dorenell Windfarm
Community Benefit Fund. 
Islington Affordable workspaces18
Concerned with small businesses being increasingly priced out of the borough due to
high property costs, Islington council have secured affordable workspace through
developer obligations. In lieu of paying rent, operators charge affordable rents and
deliver a range of services that benefit the local community and businesses, such as: 
Employment and skills initiatives
Business advice and support
Mentoring and networking
Cluster development
Community engagement   
The impact of one of the spaces SPACE4 – a Cooperative co-working space has seen:
106 regular workspace users
932 hours of expert business advice
50% of workspace offered free of charge 
207 weeks of apprenticeship training given to 45 apprenticeship seekers. 
Social value output of £843,900 in 20/21 
For the programme as a whole, the workspaces have delivered over £1.24 million
equivalent of social value output up until March 2022. 
17 https://www.scottishhousingnews.com/articles/community-led-affordable-homes-in-
tomintoul-open-to-applications 
18 https://www.islington.gov.uk/business/support-information-for-business/affordable-
workspace
Page 492

Page 493

5.5 Finance 
23Moray Community Wealth Building Strategy
Capitalize on opportunities for public and community
investment in local development proposals.  AIM
Credit Union 
Moray Firth Credit Union is a not for
profit, democratically run financial
cooperative with branches in Forres, Elgin
and Buckie who offer safe, accessible
savings and fair, affordable low-interest
loans to their members. 
In order to support the growth of the
credit union increased promotional
backing is needed to encourage local
employers to sign up to the Credit Unions
workplace savings scheme. 
Moray Funders Forum 
Launched in May 2021, the Moray
Funders Forum was established in
partnership between Adam Family
Foundation, The Gordon & Ena Baxter
Foundation and TsiMORAY. 
With 14 grant-making funds represented,
Moray Funders’ Forum members have
the aim of improving the impact of local
grant-giving in Moray. The forum aims to
ensure the right organisations gain
access to resources and meet the
changing needs within the Moray
community. In addition to information
sharing and hearing from community
practitioners, members will use the
forum to encourage greater investment
in Moray by national funding bodies. 
Page 493

Page 494

24 Moray Community Wealth Building Strategy
Moray Growth Deal
The Moray Growth Deal (MGD) will deliver transformational investment to drive
economic growth across the region by investing over £100 million in eight strategic
projects that will maximise Moray’s future economic competitiveness. The Deal will
build on the existing strengths of Moray’s culture, tourism, and world-renowned
manufacturing sectors, while also addressing transport and housing challenges to
facilitate economic growth that’s sustainable, fair and inclusive. 
A Community Wealth Building approach will be embedded within the Moray Growth
Deal programme. An action plan will be developed for each Moray Growth Deal
project to ensure the projects maximise local benefit and retain investment in the
local economy. 
Just Transition Funding
Moray’s economy is expected to undergo a transformation in the years ahead
through the transition away from carbon intensive industries, towards renewables
and the development of new sustainable careers. Over the next ten years this will be
accelerated through funding from the Scottish Government’s £500m Just Transition
Fund. Moray is one of only three local authorities which can access this investment. 
Finance objectives 
1. Support investment into Moray Firth Credit Union 
2. Increase the number of impactful Participatory Budgeting (PB) decisions conducted
by Anchor partners.
3. Encourage public and private sector investments into Moray that support local
supply chains, skills development and community projects. 
4. Explore alternative forms of finance including the creation of a ‘Moray Fund’ to
raise funding for public and community projects. 
Moray Strategy Linkages 
Moray Council Corporate plan 
Moray Outcome Improvement Plan
Moray Local Development Plan 2020 
Moray Council Climate Change Strategy 
Crown Estate 2021- 23 Climate Change Action Plan
Cairngorms National Park Local Development Plan 2020 
Page 494

Page 495

Case Studies 
Ekopia investments19
Ekopia Social Investments Limited is a community benefit co-operative based in
Findhorn. Ekopia has a vision invest in social enterprises and sustainable community
development. The aim behind the fund is to support projects that have a social and
economic purpose. 
Ekopia has been involved in the development and support of affordable housing
projects in the Findhorn area for the past ten years. They have raised and invested a
total of £568,152, as of Dec 2021, supporting inspiring and dedicated organisations.
Completed housing projects include: 
Park Ecovillage Trust – 10 affordable units built in the past ten years, with total
investment standing at £371,105 as of end-December 2021.
Station House Cooperative – In 2008 Station House Co-operative Ltd was formed
for the purpose of purchasing the historic Station House, a seven unit property in
Findhorn village. The purchase of Station House was completed in November 2008,
and the work undertaken has enabled £30,000 to be available to support the
provision of low cost rents at this property.
New Findhorn Directions Ltd – Ekopia has provided funding for 8 affordable units
to be built in 2021 for New Findhorn Directions, who are an organisation that
provides accommodation, infrastructure and other site services in the Findhorn
Ecovillage. 
Other investments made by Ekopia have included; Moray Art Centre; Phoenix
Community Store and Café and Drumduan School. 
West Berkshire Council Climate Change Bond 
Launched in July 2020 West Berkshire Council Climate Change Bond is the first
Community Municipal Investment in the UK. This Climate Bond will help deliver on
the West Berkshire Environmental Strategy. Since its launch, a £520k Solar PV project,
habitat restoration and afforestation for flood alleviation projects, active travel
infrastructure improvements, and street lighting upgrades have all been started.20 
The bond has allowed local people to invest in the council’s climate ambitions whilst
gaining a return on their investment. Current statistics highlight that 23% of the total
invested amounts came from district residents. On average, each local resident
invested more than twice as much money as a non-resident. 
25Moray Community Wealth Building Strategy
19 Ekopia 2022 AGM report 
20 West Berkshire: Climate Change Bond
Page 495

Page 496

26 Moray Community Wealth Building Strategy
The successful delivery of the CWB strategy in Moray will be reliant upon the
commitment of local anchor partners. The newly created Moray Anchor Network will
report into Community Planning through Moray Economic Partnership and progress
on the strategy will be reported annually to Moray Council and the Community
Planning Partnership with additional updates or reports when needed. 
To ensure this strategy and action plan is successful, support is needed from
corporate and community planning level to embed a culture where community
benefits are seen as significant considerations across all anchor activities. 
Annual reporting will ensure accountability and identify areas for improvement. The
Strategy and Action Plan will be continuously monitored by the officers within the
Economic Growth & Regeneration section of Moray Council with support from
Strategic Planning & Development section who will provide a strategic overview,
assisting with the coordination of the Moray Anchor Network and reporting annually
to Economic Development & Infrastructure Committee and Moray Economic
Partnership. The Key Performance Indicators for this strategy which will be reviewed
to evidence the effectiveness of the actions are highlighted below; 
Percentage of Anchor procurement spend with Moray based businesses. 
Percentage of Anchor procurement spend with the third sector. 
Proportion of people earning less than the Living Wage.
Median earnings in pounds for employees living in Moray. 
Gender pay gap. 
Number of Foundation, Modern and Graduate Apprenticeships. 
Number of Community Asset transfer requests approved & completed. 
Percentage of contracts commenced during the year which have a community
benefit. 
Whilst these are a quantifiable measure of the CWB priorities, we will know we are
successful when we see our communities thriving and our local businesses booming.
6. Delivery
Page 496

Page 497

Recognising that CWB is still a new term for the population of Moray, a
communication plan and promotional campaign will be embedded within the Moray
Economic Partnership (MEP) Communications plan across all five pillars of CWB,
highlighting the need for and impact of the approach and how it will be tailored
specifically to Moray. This will include meaningful engagement with all MEP and CPP
stakeholders and Moray Growth Deal project managers, to ensure alignment of
delivery. The communications activities will be delivered using existing resource
across the partnership. 
Within the Communications plan, we will identify and celebrate pre-existing activities
aligned to CWB in Moray, such as Forres Area Community Trust, Moray Reach Out,
Outfit Moray and Moray Firth Credit Union. These communications will be used to
highlight the added value in terms of local market development, increased
employment opportunities, and improved community capacity.
27Moray Community Wealth Building Strategy
7. Communication
Page 497

Page 498

28 Moray Community Wealth Building Strategy
Appendix - Moray CWB Action Plan
ActionsCWB Objectives
Expand
delivery of
community
benefit by
embedding
across all
public
procurements 
Grow the
percentage of
procurement
spend with
Moray based
suppliers from
each anchor
partner 
Lead Key Partners
Establishment and launch of
Community Identified Benefits List
within Moray Council. 
Work with anchor partners to
ensure community benefits are
included in future procurement
activities above £50K. 
Establish working group with
neighbouring public agencies in
Highland, Aberdeenshire and
Aberdeen to identify best practice
and shared learnings to grow
regional spend. 
Refresh the Supplier Development
Forum strategy to analyse the
barriers to local enterprises bidding
for local contracts and identify best
methods grow local spend. 
Introduce a CWB training
programme for procurement
officers and contract managers. 
Establishment of a Business
Database to increase awareness
amongst Anchors of the local
business base. 
Moray Council
Community
Support Unit
(CSU),
Economic
Growth &
Regeneration
(EG&R),  MC
Procurement 
CSU 
EG&R 
EG&R 
EG&R 
EG&R 
tsiMORAY 
tsiMORAY, 
HIE, NHS
Grampian,
UHI Moray,
MC
Procurement
, EG&R 
Procurement
Teams 
HIE, NHS
Grampian,
UHI Moray,
MC
Procurement
, CSU,
tsiMORAY 
HIE, NHS
Grampian,
UHI Moray,
MC
Procurement
team 
Moray
Chamber,
FSB.
Business
Gateway 
Spending
Page 498

Page 499

29Moray Community Wealth Building Strategy
ActionsCWB Objectives
Increase
Anchor spend
with
community led
and third
sector
businesses. 
Support
delivery of Fair
Work First
through
anchor spend 
Embed CWB
approach in 
strategic
activity of
Anchor
Partners
Lead Key Partners
Work with all project managers to
embed a local spend action plan
within major projects or contracts. 
Maximise local supplier access to
dedicated training sessions through
Supplier Development Programme
to upskill local suppliers on how to
tender. 
Provide support to local business to
get business tender ready. 
Annual procurement workshop with
Moray Social Enterprise Network
with attendance from procurement
representatives. 
Encourage social enterprises to
avail from procurement support
offered by dedicated support
bodies. 
Work with contracts managers and
procurement teams to embed
scoring of Fair Work Criteria within
Anchor procurements. 
Annual report collating number of
strategic policies or decisions
influenced by CWB approach. 
EG&R 
EG&R 
EG&R 
tsiMORAY &
EG&R 
tsiMORAY 
EG&R 
Moray Anchor
Network 
UHI Moray,
HIE, DHI,
Moray
Council 
Business
Gateway 
Business
Gateway 
MC
Procurement 
MC
Procurement
Team, HIE,
UHI Moray,
NHS
Grampian. 
Moray
Anchor
Network 
Spending
Page 499

Page 500

30 Moray Community Wealth Building Strategy
ActionsCWB Objectives
Increase the
number of
people in
Moray
benefitting
from Fair Work
practices. 
Help to
minimise the
systemic
barriers to
people working
such as
childcare,
transport and
digital
connectivity. 
Lead Key Partners
Create a Moray Fair Work
accreditation scheme for employers
in Moray to stimulate flexible and
favourable working practices,
modern apprenticeships, staff
training, and payment of the real
living wage.  This will be a simple
register of local business and
branding around fair work, avoids
accreditation fees helps with
business database. 
Create a support scheme for
Businesses and organisations in
Moray to adopt Fair Work practices
and approaches. 
Undertake an in-depth review of the
causes of the Gender Pay Gap and
create an action plan to address to
the underlying issues. 
Identify new models of childcare for
Moray to address shortfalls in wrap
around care. 
Take a CWB approach to providing
use of public assets. 
Support Development of M.Connect
service and other community travel
projects to ensure all communities
are able to access transport when
required. 
EG&R 
HIE 
MEP 
MEP 
EG&R 
Environmental
& Commercial
Services 
Chamber,
FSB, HIE,
Developing
Young
Workforce
(DYW) 
DYW,  EG&R 
HIE, UHI
Moray,
Chamber,
tsiMORAY.
(Short life
working
group) 
Scottish
Government
Moray
Council
HIE
Moray UHI
Care
Commission 
HIE,
Chamber,
tsiMORAY,  
EC&O 
tsiMoray,
EG&R 
Workforce
Page 500

Page 501

31Moray Community Wealth Building Strategy
ActionsCWB Objectives
Maximise
opportunities
for providing
skills
development
and training
opportunities
for the local
workforce
including
through local
development. 
Lead Key Partners
Review current digital infrastructure
and rollout of R100 programme to
identify gaps in provision. Then
develop campaign and action plan
to raise awareness among
households and businesses of
Scottish Broadband Voucher
Scheme and other opportunities for
improving connectivity. 
Embed the requirement for skills
development and training
programmes within developer
obligations and community benefit
statements, linked to delivery of
NPF4 Policy 25. Supplementary
planning guidance will be
developed to support this. 
Increase the provision of
professional development courses
and skills academies to upskill the
local workforce.   
Provide training and skills required
to support Moray’s shift towards
Net Zero.   
SP&D 
Moray Local
Employability
Partnership,
SP&D 
UHI Moray 
UHI Moray 
EG&R 
EG&R, HIE, 
SP&D, EG&R,
HIE.
Workforce
Page 501

Page 502

32 Moray Community Wealth Building Strategy
ActionsCWB Objectives
Develop
existing
business
support
programmes to
support the
growth of
inclusive forms
of business
ownership. 
Ensure major
projects
delivered by
Moray Anchor
Network
Partners adopt
a  community
wealth building
approach 
Maximise
leverage of
external
funding
sources to
support
community led
and public
sector projects.
Lead Key Partners
Support promotion and awareness
raising of Just Transition Fund to local
business community and third sector 
Deliver business support
programmes for high growth sectors
that will make a significant impact on
local economic growth (e.g. green
economy, space, manufacturing,
tourism etc) 
Raise awareness of employee
ownership and co-operative business
models. 
Support increased promotion of the
Moray Loves Local Campaign 
Support Moray Anchor Network
project managers with embedding a
CWB approach within the business
plans for major capital and
infrastructure projects. 
Provide increased promotion of
external funding opportunities
through existing Anchor
communication channels. 
Assist with developing and
submitting funding applications on
behalf of community organisations
where the local authority is
designated as lead applicant, where
appropriate and resources allow. 
tsiMORAY 
HIE 
Cooperative
Development
Scotland, EG&R,
Chamber 
EG&R 
EGR, SP&D 
MC Corporate
Comms, EG&R,
SP&D 
EG&R 
EG&R,
Chamber,
FSB. 
EG&R,
Chamber, 
EG&R 
ALL 
HIE,
tsiMORAY 
Inclusive Ownership
Page 502

Page 503

33Moray Community Wealth Building Strategy
ActionsCWB Objectives
Facilitate use of
public assets to
support the
needs of the
community. 
Assist local
communities to
take ownership
of vacant or
underused
public assets. 
Lead Key Partners
Maximise the use of outdoor space
for community benefit such as
green spaces, woodlands,
community food growing,
biodiversity activities, play areas,
renewable energy etc 
Promote the availability of vacant,
underused public assets. 
Reduce any identified barriers and
support communities to have the
adequate knowledge and skills to
complete the CAT process. 
Promotional campaign to celebrate
the success of CAT’s in Moray to
raise awareness and stimulate
further interest. 
SP&D 
EG&R 
CSU 
CSU 
tsiMORAY,
CSU 
Elgin BID,
Chamber,
FSB,  SP&D 
tsiMORAY 
tsiMORAY 
Land and Property
Increase
capacity
amongst third
sector
organisations.
tsiMORAY 
ALL 
CSU 
ALL 
Support and promote Corporate
Social Responsibility, pro-bono and
volunteering schemes to increase
capacity of third sector 
Encourage Anchor partners to offer
an annual volunteering allowance
for employees to expand
volunteering capacity in support of
the third sector.
Inclusive Ownership
Page 503

Page 504

34 Moray Community Wealth Building Strategy
ActionsCWB Objectives
Embed
community
benefit
requirements
into local
planning policy. 
Support
investment into
Moray Firth
Credit Union. 
Increase the
number of
impactful
Participatory
Budgeting (PB)
decisions
conducted by
Anchor
partners. 
Encourage
public and
private sector
investments
into Moray that
support local
supply chains,
skills
development
and community
projects. 
Lead Key Partners
SP&D 
SP&D 
EG&R 
EG&R 
Moray Council 
tsiMORAY 
SP&D 
SP&D 
HIE,
Chamber. 
tsiMORAY 
Chamber,
Business
Gateway 
CSU, EG&R 
CSU 
Land and Property
Finance
Implement CWB planning guidance
for all upcoming major developments
including wind farms. 
Maximise local impact of Developer
Obligations to support skills
development opportunities and
provide community infrastructure,
linked to NPF4 Policy. 
Support the engagement with large
employers including anchor partners
in the region to encourage the
uptake of the Credit Union Workplace
Savings scheme. 
Raise awareness of small business
loans that can be offered through the
Moray Firth Credit Union. 
Deliver against the Scottish
Government target of ensuring at
least 1% of all funding decisions are
conducted by PB. 
Increase the number of local funding
programmes awarded by PB, for
example Just Transition. 
Develop CWB supplementary
planning guidance that will ensure
future developments in Moray
deliver on supporting local jobs and
the local community. 
Deliver targeted investment
programmes providing employment
land and housing in rural / deprived
areas through delivery of the Local
Development Plan and NPF4 Policy. 
Page 504

Page 505

35Moray Community Wealth Building Strategy
ActionsCWB Objectives
Explore
alternative
forms of finance
including the
creation of a
‘Moray Fund’ to
raise funding for
public and
community
projects. 
Lead Key Partners
tsiMORAY 
SP&D 
SP&D 
Finance
EG&R 
EG&R
Support the  growth of Community
Benefit Societies in Moray. 
Explore and research the use of
Community Municipal Investment
funding for renewable energy
projects 
Explore the feasibility of public sector
investment into existing renewable
energy schemes.
Page 505

Page 506

Page 506

Page 507

APPENDIX 2
CWB KPIs 
Community Wealth Building Key Performance Indicators 
Percentage of Anchor procurement spend with the third sector 
2019/20 2020/21 2021/22
Moray Council  TBC TBC TBC
NHS Grampian  TBC TBC TBC
HIE  TBC TBC TBC
UHI Moray  TBC TBC TBC 
Percentage of Anchor procurement spend with Moray based businesses 
2019/20 2020/21 2021/22
Moray Council  
21.96%  23.56%  25.80%
NHS Grampian  
0.61%  1.03%  0.76%
HIE 
0.93%  0.22%  0.15%
UHI Moray  
Not available  Not available  21.96%
Proportion of people earning less than the Living Wage 
19/20 20/21 21/22
Moray  24.0% 21.5% 19.4%
Scottish Average  16.9% 15.2% 14.4%
Median earnings in pounds for employees living in Moray.
Year Moray Scotland
2022 £598.80 £640.30
2021 £565.50 £619.90
2020 £550.60 £595.00
2019 £561.60 £578.30
2018 £527.20 £562.70
Gender pay gap 
2019 2020 2021
Median gender pay
gap in Moray
21.9% 19.3% 22.6%
Median gender pay
gap in Scotland
14.7% 11.6% 11.5%
Item 11
Page 507

Page 508

APPENDIX 2
CWB KPIs 
Number of apprenticeships in all sectors in Moray 
2019/20 2020/21 2021/22
Foundation
Apprenticeships 
40 38 Not available
Modern
Apprenticeships 
399 341 366
Graduate
Apprenticeships
11 12 Not available 
Number of Community Asset transfer requests approved & completed 
2019/20 2020/21 2021/22
Moray Council  TBC TBC TBC
NHS Grampian  TBC TBC TBC
HIE  TBC TBC TBC
UHI Moray  TBC TBC TBC
Crown Estate Scotland TBC TBC TBC 
Percentage of contracts commenced during the year which have a community benefit 
2018/19
Target 
(2019/20) (2020/21)
Percentage of commenced contracts within
the year that have a community benefit
(category 7)
20%  5.83%  11.36% 
Percentage of collaborative contracts
commenced in the year that have a
community benefit (category 7)
20%  4.58%  6.06% 
Page 508

Page 509

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 20 JUNE 2023 
SUBJECT: EXTERNAL GRANT FUNDING UPDATES 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Council of external funding updates including the Crown Estate
Coastal Community Fund, Business Loan Scotland and Heritage & Place
Programme and the opening of the Regeneration Capital Grant Fund Round
11 with a deadline of 21st June 2023 for Stage I applications.   
1.2 This report is submitted to Council in terms of Section III A (2) of the Scheme
of Administration relating to long-term financial plans. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee: 
(i) approve the Crown Estate Coastal Community Fund 2023/2024
allocation towards electrical upgrades at Buckie Harbour and
Coast to Country project, as outlined in paragraph 3.1; 
(ii) give delegated authority to the Head of Economic and
Development Services to allocate funds returned from the
Business Loan Scheme in 2023 to initiatives that encourage local
spend and boost the local economy;  
(iii) note that the Heritage & Place Programme applications for the
Development Phase to deliver Forres Town Centre Improvement
Plan were successful; 
(iv) consider the opportunity to submit a multi-year project proposal
for Elgin Town Hall (Growth Deal Cultural Quarter) to the
Regeneration Capital Grant Fund 2024/25, in addition to the
requests by Dufftown & District Community Association,
Portgordon Community Trust,  Tomintoul & Glenlivet
Development Trust, The Cabrach Trust and Forres Area
Item 12
Page 509

Page 510

SPMAN-813460984-376 
Community Trust to act as lead applicant, with no financial
implications for the Council for all applications except the Cultural
Quarter application, and if agreed; 
(v) approve the submission of Stage I applications as set out in (iv)
above, and if successful, submission of Stage II applications. 
3. BACKGROUND 
3.1 Crown Estate Coastal Community Fund (CCF) – Phase 3 of the Staycation
Ready project as reported to Council on 12 May 2021 (paragraph 18.4 of the
minute refers) included an allocation of £20,000 from the 2020/21 CCCF
towards work at Findhorn which was subsequently completed and claimed for
by Findhorn Village Conservation Company.  However an oversight in the later
report to Council on 28 September 2022 (paragraph 24 of the minute refers)
assumed the full £138,192 allocation for 2020/21 was available as match
funding towards Phase 4 of the Staycation Ready project.   It is therefore
proposed to use £20,000 from the 2023/24 CCF allocation of £116,000 to cover
this shortfall.  It is proposed that the remaining £86,000 is used for electrical
upgrades at Buckie Harbour. 
3.2 Business Loan Scotland (BLS) – BLS was formed in March 2017, with 27
Scottish Local Authorities becoming Full Members of the Company and 5 Local
Authorities becoming Associate Members. Each Full Member made a match
funding contribution to the initial finances of the Company and can now request
the return of their investment.  For Moray Council forecast return including
match funding and interest if all 4 loans were repaid in full was £202,718. 
However £10.3k was top sliced from each Member Authority to create a ring
fenced amount within BLS for any future liabilities i.e. pension deficit leaving a
balance of £192,418.  Further reductions totalling £17.7k (outlined below) have
reduced the balance to £174,718. 
• Loan A was repaid in full
• Loan B was written off in 2021 with a loss of £14.6k of income and
with £1.2k used towards legal fees for recovery
• Loan C was repaid early and benefitted from a reduction in interest
charges of £1.9k
• Loan D is still active and since the business ceased trading the
loan was rescheduled for full repayment by March 2028.  This loan
will accrue a return of £17,387 on completion, assuming
repayments are kept up.   Cash at bank is currently £11,637 and
once this loan is repaid in full, this will accrue around £29k. 
3.3 In March 2022, £100,000 was returned to Moray Council and used to provide
much need capital start-up grants for new businesses as part of the Economic
Recovery Plan.  An additional £45,000 has been returned in March 2023
following BLS Board Approval and approval is requested to use this funding to
provide much needed support to small and medium enterprises in Moray by
developing initiatives that encourage local spend and boost the local economy. 
Page 510

Page 511

SPMAN-813460984-376 
As per the BLS Articles of Association, returned funds must be in keeping with
the Company’s objects and comply with the purpose for which the resources
are being withdrawn i.e. to support local business activity and could therefore
not be transferred to council reserves or to benefit reserves indirectly by
replacing existing budget for the core function of the economic development
team.  The Moray Gift Card will run until September 2023 and continuation
funding for administration costs is required otherwise the scheme will end at
this point.  From launch in August 2021 to date, it has brought £98,000 into
local businesses with 232 across Moray now registered to accept the card.  It is
therefore proposed to allocate £26,000 to continue administration of the
scheme into 2023-2024 and 2024-2025 and to use the balance to develop
further promotional incentives over the next 2 years to target visitors, working in
partnership with Elgin BID, Business Gateway, Moray Chamber of Commerce
and Visit Moray Speyside.  The temporary Development Officer post will end in
September however the promotional work will be absorbed within the Economic
Growth & Regeneration Team. 
3.4 Heritage and Place Programme (H&PP) – Following agreement at a meeting
of this Committee on 15 November 2022 (paragraph 17 of the minute refers),
Development Phase applications to support delivery of the Forres Town Centre
Improvement Plan were submitted to the National Lottery Heritage Fund and
Historic Environment Scotland.  These applications have been successful in
securing £33,000 from each funder and, combined with £20,000 from the UK
Shared Prosperity Fund, will fund a temporary Grade 8 Development Officer to
prepare the Delivery Phase applications to the same bodies, in consultation
with the community and partner organisations over a period of 12 months, and
commission the specified supporting documents including: Evaluation Strategy,
Skills Audit & Traditional Skills Training Plan, Updated Conservation Area
Appraisal (including costs, building valuations, materials audit, management &
maintenance strategy) and Activities Plan.  A Partnership Agreement will be
drawn up and a more detailed report will be presented to Committee in
April/May 2024 to request approval to submit applications for the Delivery
Phase, based on the findings of the Development Phase.  The Delivery Phase
2024-2029 (if application submission is approved and successful), will result in
a £3.3m 5 year investment programme and will help to deliver the Forres Town
Centre Improvement Plan in terms of key building repairs, public realm
improvements, shop front scheme and heritage interpretation. 
3.5 Regeneration Capital Grant Fund 2024/2025 (RCGF) - Invitation for Round
11, Stage I outline proposals has been announced with a submission deadline
of 21 June 2023.  It is considered that the aspect of the Cultural Quarter project
for redevelopment of Elgin Town Hall will bring maximum benefit for Moray as a
whole.  It is an excellent fit for the fund and submission to this round as a multi-
year project will ensure that the Growth Deal delivery timescale is met. 
However since only Local Authorities can apply to this fund, five Community
Associations in Moray have requested for the Council to be the lead applicant
on their behalf and work has also been ongoing in developing their proposals. 
RCGF is delivered annually in partnership with COSLA, supporting locally
developed place-based regeneration projects that involve local communities,
helping to tackle inequality and support inclusive growth in disadvantaged and
fragile communities across Scotland. The fund is primarily aimed at providing
Page 511

Page 512

SPMAN-813460984-376 
new and/or improved infrastructure to improve the economic, social, and
physical environment of communities and is open to all 32 Scottish Local
Authorities. 
3.6 There is no restriction on the number of applications that may be submitted by
each Local Authority but, given the limited size of the overall fund, applicants
are requested to be realistic with the number of applications and combined
value of grant requests being made.  Also where project proposals are being
submitted by lead bodies on behalf of partners, these project proposals must be
considered and supported by lead bodies prior to final submission.  Lead
applicants are expected to review all applications closely, consider how the
projects will meet RCGF criteria, and in particular, can deliver the outcomes
and draw grant as profiled within the required timeframes. A key consideration
will be whether the project is ready to be delivered in financial year 2024/2025.  
Projects starting after 31 December 2024, but prior to 31 March 2025 will be
scrutinised carefully and a clear case must be provided in order to justify the
project’s viability. It is therefore crucial that the full business case for Elgin
Town Hall is submitted with the Stage II application, if invited. Project proposals
should be prioritised accordingly where more than one application is being
submitted. 
3.7 RCGF applications follow a two-stage, competitive process. The independent
RCGF Investment Panel makes recommendations to Ministers and COSLA on
those projects to be funded from each round.  Closing deadline for Stage I
applications is 21 June 2023 by 5pm and if successful Stage II applications
have to be submitted in October 2023 with outcomes known in January 2024. 
3.8 Applicants may apply for 100% funding of the total eligible project costs.
However, any match funding leverage will be considered as part of the RCGF
Investment Panel’s assessment of applications, in terms of either contribution
to a wider programme or within the project itself. 
3.9 A total of £25m is available in financial year 2024/25 which if spread equally
across 32 local authorities equates to approximately £781k per region.  It is
proposed that the Elgin Town Hall project requests £500k in 2024/25 to
facilitate the start of the refurbishment and expansion project and a further
£1.5-£2m in 2025/26.  In addition, the combined value of grant requests being
made for the five Moray community projects in 2024/25 is £4,759,455 which is
testament to the enterprising community spirit.  However, in line with the
guidance provided, it is unfortunately considered to be unrealistic to request
this level of contribution in one financial year. Council officers have therefore
reviewed the proposals closely, in consultation with Highlands & Islands
Enterprise (HIE).  It is considered that all proposals meet the RCGF criteria,
can deliver the outcomes and draw grant to deliver in financial year 2024/25. 
As a result, all project proposals have been prioritised according to whether or
not they have previously been unsuccessful in their RCGF submission, together
with consideration of the grant amount requested and match funding secured
given the limited amount of funding available.  This approach is considered to
be fair in that it will provide opportunity for newly developed projects to be
considered first, without excluding those that have been previously submitted. 
Page 512

Page 513

SPMAN-813460984-376 
Approval is therefore required to submit all six proposals in line with the priority
allocated to each project in APPENDIX I.   
3.10 Detail on the Elgin Town Hall project and each of the proposals from the
community organisations is provided as follows: 
Cultural Quarter Elgin Town Hall   APPENDIX II
Dufftown & District Community Association APPENDIX III
Portgordon Community Trust    APPENDIX IV
Tomintoul & Glenlivet Development Trust APPENDIX V
The Cabrach Trust     APPENDIX VI
Forres Area Community Trust    APPENDIX VII 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
All of the projects and funding opportunities will contribute to achieving
the corporate plan priority to promote economic development and
growth, also with the LOIP priority of a growing and sustainable
economy. 
(b) Policy and Legal
The Council considers support for economic development issues on their
merits, against the objective to facilitate sustainable economic growth
and the desired outcomes of the Ten Year Plan and Corporate Plan.
For any partnership agreements Legal will be consulted. 
(c) Financial implications
CCF - allocation for 2023/24 is £116k.  £20k is to be used towards the
Staycation Ready project Phase 4 (RTIF Coast to Country).  £86k is to
contribute toward electrical upgrades at Buckie Harbour. 
BLS – return of £45k in March 2023 to be used towards extension of the
Moray Gift Card Scheme in 2023/24 and 2024/25, and to develop further
promotional incentives across Moray. 
H&PP - £86k has been secured in May 2023 to fund the 12 month
development phase for applications to deliver a £3.3m Forres
Conservation & Heritage Scheme which will support delivery of the
Forres Town Centre Improvement Plan. 
RCGF – Cultural Quarter Elgin Town Hall project has £12,773,056
secured via the Moray Growth Deal towards a total project cost of
£15,884,100.  It is proposed that the overall request to RCGF for the
multi-year project is £2-£2.5m.  £500k in 2024/25 and £1.5-£2m in
£2025/25.  Match funding of £1,111,044 / £611,044 will be sought from
National Lottery Heritage Fund and other suitable heritage funders 
Page 513

Page 514

SPMAN-813460984-376 
As only Local Authorities can apply to RCGF, requests from the
Community Trusts have been made for the Council to front the
applications.  There are no direct financial implications for Council
however there is a risk of the 3rd sector providers being unable to fulfil
the funding conditions and the Council being liable to repay the grant
funding.  Mitigations are set out in the risk section. 
The total request for RCGF funding in 2024/25 between the six
proposals is £5,259,455 however it is considered unlikely that all of the
outline proposals will be invited to submit applications for Stage II. 
(d) Risk Implications
For RCGF there is a risk that since the Elgin Town Hall project straddles
2 years it may be considered less of a priority however it will be too late
in the project schedule to delay submission to 2025/26 and therefore
considered necessary to submit for a multi-year project in 2024/25. 
There is also a risk of the 3rd sector providers being unable to fulfil the
funding conditions and the Council being liable to repay the grant
funding.  To mitigate any risks, partnership agreements will be drawn up
at full application stage outlining that the Trusts will adhere to all funders
grant conditions and that they are solely responsible for any liabilities
associated with the funding. The agreements will also confirm that all
match funding must be in place prior to any work starting and that details
of suitable professional management arrangements with regular
reporting, compliance with procurement and subsidy control
requirements must be provided.   
Project Total Project Cost RCGF request
24/25
Match Funding
CQ Elgin Town Hall £15,884,100 £500,000 £12,773,056
confirmed
Growth Deal
Forres Town Hall £5,188,396 £1,985,782 £320,000
confirmed
Tomintoul Camp
Site
£1,000,000 £500,000 £500,000
Confirmed
Cabrach Heritage
Centre
£1,750,000 £1,000,000 £750,000 to be
confirmed
Portgordon
Community Hub
£864,813 £664,813 £200,000 to be
confirmed
Dufftown Clock
Tower
£831,130 £608,860 £222,269 to be
confirmed  
£5,259,455 
Page 514

Page 515

SPMAN-813460984-376 
There is also a risk to Council as lead applicant that the 3rd sector
providers will not have the capacity to deliver the capital projects. 
However all 5 organisations have at least one full time person in post to
deliver the projects, 4 of which are account managed and funded by HIE. 
Professional expertise will be included within the overall project costs to
ensure that construction meets the required standards. 
(e) Staffing Implications
Administration and reporting on external funding is undertaken by the
Economic Growth & Regeneration Team.  For RCGF, the Cultural
Quarter Project Manager will prepare the applications for Elgin Town Hall
and subsequent claims and have responsibility for procurement,
monitoring and evaluation.  The community applicant organisations will
also prepare their applications and claims; set up project systems for
carrying out the works including for procurement, monitoring and
evaluation. 
Staff from the Economic Growth & Regeneration section will provide
support for submitting the applications, interim and final claims to the
RCGF supported by staff from Accountancy and make arrangements for
claimed funds to be transferred to the organisations. If the funding
applications are successful, all projects have to be completed by end of
the financial year 24/25 unless previously agreed.   Project delivery may
extend beyond the period of funding support from RCGF but applicants
will be required to provide monitoring reports throughout the delivery
phase, for a period up to 12 months after physical completion. 
The required support work can be accommodated within existing staffing
resources, however at this stage it is difficult to forecast how many staff
hours it will require as it depends on the experience & efficiency of the
project management for these initiatives. It can range from the
equivalents of a couple of hours to several days per month, which may
impact on resources needed to be considered against other/new
economic priorities and funds. If the project management provided by the
organisations is effective and efficient the impact on staff will be a few
hours a month. 
All applicants have been made aware that they require suitably qualified
and experienced project management staff and arrangements to be in
place. If staffing in third party organisations falls short of these
requirements, consideration of officer support for submission of Stage II
applications will need to be reviewed. 
(f) Property
All of the RCGF community proposals relate to community owned
assets.  Elgin Town Hall is a council owned asset which has been
successfully managed by Registered Charity and Company Limited by
Guarantee, Elgin Town Hall for the Community, since 2018.  The
building is currently leased on a monthly full repairing and insurance
lease (peppercorn) with the future operating model being part of the Full
Business Case proposals for the project. Elgin Town Hall is a Grade B
Page 515

Page 516

SPMAN-813460984-376 
Listed modernist Town Hall designed by William Kininmonth circa 1965
and a Conservation Architect will be appointed to oversee works. Works
will include exploring renewable energy options (an appraisal of solar
potential had already been completed), insulation and how the
improvement of separation and flow around the building could improve
operational performance in terms of energy use. 
(g) Equalities/Socio Economic Impact
An equality impact assessment is not required as the reason for the
report is for the Council to consider being the lead applicant for the
community organisations to access funds, which they could not
undertake themselves. 
The focus of the RCGF is on projects in areas that suffer from high levels
of deprivation and disadvantage and that demonstrate clear community
involvement. Being lead applicant for all 6 projects will assist the council
in addressing socio-economic inequalities in accordance with the Fairer
Scotland duty. 
(h) Climate Change and Biodiversity Impacts
As part of the RCGF application process all proposals have to
demonstrate consideration and contribution towards achieving the target
of net-zero carbon emissions by 2045. 
(i) Consultations
Consultations have been undertaken with the Chief Executive, the
Deputy Chief Executive (Economy, Environment and Finance), the
Deputy Chief Executive (Education, Communities and Organisational
Development), all Heads of Service, Equalities Officer and Lindsey
Robinson Committee Services Officer. Where comments have been
received, these have been included within the report. 
5. CONCLUSION 
5.1 There is significant value in both the external funding allocations to
Council and opportunities to apply for H&PP and RCGF.  All of the
outline proposals for RCGF have ambitious regeneration plans in the
respective areas. They have been locally developed, involving the
communities and on completion will create economic, social and
physical regeneration outcomes.   
5.2 It is therefore recommended to support the Cultural Quarter Elgin Town
Hall project and the community organisations’ requests for Council to
work in partnership by submitting all six Stage I outline proposals in
order of priority outlined in APPENDIX I, and to approve submission of
Stage 2 applications if successful.  Should any management or other
issues arise in the interim, a further report will be submitted to this
committee. 
Page 516

Page 517

SPMAN-813460984-376 
Author of Report: Kirsty Conti, Economic Growth & Regeneration Manager
and Yvonne Joss, Development Officer, Economic Growth
& Regeneration
Background Papers: Documents on file in Economic Growth & Regeneration
section
Ref: SPMAN-813460984-376 
Page 517

Page 518

Page 518

Page 519

APPENDIX 1 – RCGF Projects prioritisation table
Project Lead Project RCGF
Requested
2024/25
RCGF
Requested
2025/26
Total Project
Cost
Match
Funding
Previous RCGF
Submission
PRIORITY 
Cultural Quarter Elgin Town Hall £500,000 £1.5-£2m £15,884,100 £12,773,056 no 1
Dufftown &
District
Community
Association 
Dufftown Clock Tower £608,860  £831,130 £222,270 no  2
Portgordon
Community Trust
Portgordon Community
Hub
£664,813  £864,813 £200,000 no 3
Tomintoul &
Glenlivet
Development
Trust
Tomintoul Community
Campsite
£500,000  £1,000,000 £500,000 2022/2023 –
unsuccessful at Stage I
4
The Cabrach Trust  The Cabrach Distillery &
Heritage Centre CIC
£1,000,000  £1,750,000 £750,000 2021/2022 – Phase 2
project unsuccessful at
Stage II
5
Forres Area
Community Trust
Forres Town Hall - An
Enterprising Community
Venue
£1,985,782 £1,014,218 £5,188,396 £2,188,396 2020/2021 –
unsuccessful at Stage I
2022/2023 –
unsuccessful at Stage II
6
£5,259,455 £2.5-£3m £25,518,439 £16,633,722   
Item 12
Page 519

Page 520

Page 520

Page 521

Appendix II
Moray Council / Elgin Town Hall for the Community: 
Moray Cultural Quarter: Elgin Town Hall 
Overview:
The Cultural Quarter is one of eight strategic projects designed to maximise Moray’s future
economic competitiveness which make up the Moray Growth Deal. The Cultural Quarter will
redevelop two important B-Listed buildings in the heart of Elgin to create a connected,
accessible and inspirational cultural centre and leverage private sector investment for a new
city centre hotel.  Phase 1 of the Cultural Quarter is the refurbishment and extension of Elgin
Town Hall to create an accessible regional hub for the performing arts, entertainment,
creative industries, and the community. Elgin Town Hall is a B Listed building in the centre of
Elgin, owned by The Moray Council and operated by Registered Charity Elgin Town Hall for
the Community.  Delivered between 2024 and 2026, the project will build on the current
success of the Town Hall, increasing organisational sustainability and delivering significant
economic, social and physical regeneration outcomes which benefit both Elgin and the wider
region. The indicative cost of the redevelopment is £15,884,100. The request from RCGF is
£2,500,000/£2,000,000. The project has match funding of £12,773,056 from Moray Growth
Deal investment partners (Scottish Govt., UK Govt., Highlands and Islands Enterprise and
Moray Council) and the remaining balance of £1,111,044 / £611,044 will be sought from the
National Lottery Heritage Fund and other suitable heritage funders. 
Background: 
Elgin Town Hall is a council owned asset which has been successfully managed by
Registered Charity and Company Limited by Guarantee, Elgin Town Hall for the Community,
since 2018. The project has great support from the community, with over 60,000 visits via
regular weekly and monthly community bookings in the year since July 2022, and a further
23,352 visitors to large events in the main auditorium. In addition to a small team of paid
staff and sessional bar staff, the Charity is supported by 46 regular volunteers. 
What this project will actually deliver & regeneration outcomes
The renovation will deliver improved visibility, access and circulation in the building,
improved backstage, meetings, events and screening facilities, sound/film recording
facilities, and segregated performances spaces, including a new studio in addition to an
enhanced auditorium. Updating the already popular Elgin Town Hall will enable the venue
and Elgin to take its rightful place as the third major cultural centre in a row of important
Northern capitals, all one hour apart, making activity more accessible to local residents
whilst encouraging people from neighbouring cities and beyond to travel to Moray for cultural
activity. 
Economic – Underpinning the MGD is the strategic objective that the area is seen as
particularly attractive for young people, professionals and families, providing opportunities
for them to pursue challenging and rewarding careers while enjoying the benefits of an
exceptional, connected and cultural environment in which to live, work and relax. The
cultural and evening economy are cited by major employers such as the NHS as a big factor
in attracting employees, whilst a recent survey by Highlands and Islands Enterprise found
that limitations in the cultural offer and services was a major factor for young people leaving
the region to pursue study and careers elsewhere. The redevelopment of Elgin Town Hall is
a key opportunity for physical regeneration to support social and economic change.
Improving the appearance, profile and enhancing the offer at Elgin Town Hall can change
perceptions of the building and pique interest in the facilities and programme from local
people as well as visitors and passers-by. In addition to this, the current layout of the
building is restrictive and with some basic alterations Elgin Town Hall could become more
usable, flexible and customer friendly. Alterations will increase income generating
opportunities increasing the usable space and number/types of activity which the hall could
Item 12
Page 521

Page 522

be used for, and supporting the ongoing financial sustainability and growth of the
organisation. 
Environmental – Elgin Town Hall is a Grade B Listed modernist Town Hall designed by
William Kininmonth circa 1965.  It contains ancillary spaces, lesser halls and foyer that wrap
around the main hall with stage, stalls and balcony. The building’s layout undermines its
potential flexibility, operational and energy efficiency due to lack of acoustic and physical
separation between the Main hall and surrounding ancillary spaces. A Conservation
Architect will be appointed to address how these issues can be overcome whilst remaining
sensitive to the listing and unique character of the building, whilst minimising environmental
impact. Works will include exploring renewable energy options (an appraisal of solar
potential had already been completed), insulation and how the improvement of separation
and flow around the building could improve operational performance in terms of energy use. 
Social – The existing Elgin Town Hall is well used as a performance venue and events
include theatre, conferences, concerts, and participatory workshops and meetings. However,
the current building is no longer able to accommodate the volume or range of activity
required to satisfy audience demand and support ongoing sustainability of the venue. The
project will build on the significant existing success of Elgin Town Hall, increasing the floor
area to include the provision of a new Studio/ “black box performance and rehearsal space,
along with new practice & rehearsal rooms, the potential of a film/music recording space and
better visitor facilities. The upgrade will enhance the venue to attract larger touring
companies therefore increasing the choice and range of cultural activity available to local
people as well as opportunities for young people, professionals and students in the area to
enjoy cultural activities and performances. Alongside performance events the building acts
as hub for a large number of local community groups and it is envisaged the upgraded
accommodation will provide enhanced facilities to support the increasing demand and to
maintain financial viability. 
The upgraded Elgin Town Hall will provide a high-profile visual symbol that will act as a
significant catalyst for economic growth, job creation, renewed civic pride, and destination
tourism, creative and commercial development for Elgin. As such, the redevelopment will lay
a strong foundation for regeneration and an enhanced environment in which all MGD
projects can flourish, helping to attract and retain talent whilst increasing tourism and
supporting the success of new city centre homes, business incubation, and enhanced
student and resident experiences. 
Total Cost
£15,884,100 with £12,773,056 secured MGD match funding, a request from RCGF of an
estimated £2m and match funding to be confirmed in due course. 
Timeframes for securing other funding
Moray Growth Deal Full Business Case – Q4 2023-24
National Lottery Heritage Fund – Stage 1 March 2024; Stage 2 Dec 2024 
Timescales and objectives
May 2023 – March 2024 Full Business Case Development
July 2023 – Dec 2024 Development work - Architectural and professional services
Oct 2024 – Dec 2024 Works contract let
Jan 2025 – July 2026 Capital Works
December 2026 - Operational 
Page 522

Page 523

Appendix III 
Dufftown and District Community Association – Clock Tower Proposal 
Overview:
Dufftown & District Community Association was established in 1995 through the
amalgamation of two groups and is the largest charity on Dufftown with 6 key sub groups
that help structure and convey their works. The proposal is to renovate Dufftown clock tower
into community and commercial spaces with visitor signposting and tourist information
station on the ground floor and holiday accommodation on the upper levels. On completion
of the capital works the project will deliver strong economic, social and physical regeneration
outcomes. The indicative total cost is £831,129 with a request from RCGF of £608,860 and
£222,269 (£177,000 HES indicative and £45,269 other) match funding   
Background: Dufftown and District Community Association is an open membership,
community owned and run development organisation in Dufftown.  It was established in
1995 and holds charitable status.   
DDCA purchased the clock tower from Moray Council in 2020 and consulted with community
groups in Dufftown to establish priorities for the period 2021 – 2026. This consultation led to
the publication of a 5-year Community Action Plan and restoration of the clock tower was
identified as one of the top priorities. A further community priorities exercise carried out in
November 2022 confirmed the restoration of the clock tower was again the number one
priority for improving Dufftown. 
What this project will actually deliver & regeneration outcomes
The restoration of the clock tower will create a long term financially sustainable and flexible
facility which will serve the local community and become a destination for visitors. The
ground floor will contain a visitor information centre and a shared space for community group
usage and commercial use.  The remaining three floors will be converted into a 1 bedroom
apartment in order to attract visitors and generate income. 
Economic – During the pandemic several shops closed in the town centre and Dufftown
currently offers less tourist beds than similar towns per head of population. There is little on
offer in terms of unique holiday accommodation in the area. Due to its central location the
clock tower will work as a hub for existing community and visitor experiences, signposting to
other tourist venues and increasing footfall within the town.  Walking tourism is increasingly
popular and Dufftown benefits both from being on the Isla Way and also having developed
its own walking trails many of which start and end at the clock tower. 
Environmental – The clock tower is a redundant Grade B listed building and DDCA aim to
find environmentally friendly design solutions which are mindful of this during the restoration
process.  A conservation accredited architect has been appointed and the concept design
will seek to minimise any environmental impact.  Traditional and natural materials will be
used where possible and renewable energy options will be explored.   
Social – The project will ensure that the building with its heritage will once again sit at the
core of community life, offering a space to meet and interact. The restoration of the clock
tower provides an opportunity for the local community to shape their own future; increasing
the sense of pride and a shared identity. Community groups will benefit from subsidised hire
rates to use the ground floor area, increasing the resilience and capacity of the third sector.
The project will promote co-design of local asset use, improve the sense of community
identity and cohesion and improve community networks. 
This project is part of wider regeneration ambitions as the clock tower restoration is one of
the top priorities in the Moray Council’s Dufftown Town Centre Improvement Plan 2022.
Furthermore, DDCA is Dufftown’s anchor organisation and is part of the Moray Speyside
Item 12
Page 523

Page 524

Appendix III 
Tourism Forum. DDCA have developed a close relationship with HIE who part fund their
community developer and have commissioned business plan work. Partnerships are central
to the success of the ground floor hub and Speyside Youth and four other local community
groups have noted interest in using the proposed community space. 
The proposed future use of the clock tower complements wider ambitions related to making
Speyside a unique visitor destination, building on our heritage and tailoring it to increasing
demand for bespoke experiences. 
Total Cost
£845,000 with a request from RCGF of an estimated £608,860 and match funding to be
confirmed in due course. 
Timeframes for securing other funding
April - May 2023: project development funding: Architectural Heritage Fund (12/04/2023),
William Grant Foundation and Dorenell Community Benefit Fund (23/05/2023). 
HES - 40% restoration capital cost funding – 177k (31/10/2023) 
Timescales and objectives
May 2023 - May 2024 Development work - Architectural and professional services
May 2024 - March 2025 Repair and restoration work
April 2025 – March 2026 Alterations and decoration work 
Page 524

Page 525

Appendix IV 
Portgordon Community Trust – Community Hub Phase 2/3 
Overview:
Portgordon Community Trust (PCT) is a company limited by guarantee that brings
together a number of local organisations including its predecessor organisation Portgordon
Harbour Group which has a remit to support village aims identified in multiple community
consultations since 2017. The trust have been involved in vision for the redevelopment of
the historic harbour assets and surrounding area as part of the area’s major regeneration
and the RCGF project, if successful will create a community hub within the area. The project
has strong environmental social, economic and regeneration outcomes. The request from
RCGF is for £664,813 and match funding of £200,000 is to be confirmed in due course. 
Background:  The objective of the Trust is to regenerate Portgordon Harbour and the
surrounding area for the benefit of the local community, by creating a Community Hub and
providing opportunities for individuals of all ages to learn new skills.  PCT purchased the
former Richmond Arms Hotel in 2022 and plan to develop a Community Hub for use by
community groups, as well as other local organisations.   
What this project will actually deliver & regeneration outcomes 
The need for a single Community Hub has been identified through profiling the area, wide
community consultation and a period of market research and can be seen in detail in a
feasibility study carried out. 
The overall aim of the project is to deliver the multi-purpose shared space which includes
provision of accessible toilets, a flexible café space with retail area, and a self-catering
apartment.
The fundamental objectives of the hub are to provide accessible services for locals,
particularly isolated people who encounter difficulty due the rural nature of the area; provide
multi-functional community space & meeting rooms; create and enhance enterprise and
volunteering and potential job opportunities as well as promote tourism through provision of
facilities and accommodation to bring new investment into the village 
Economic – The multi-purpose shared space in the hub will allow the community access to
resources and services which are not readily available in the village, such as healthcare,
educational programs, and job training. A single storey extension will increase the seating
area and cover potential of the proposed café and it is hoped a high-quality catering tenant
will provide an increased lease income to the community and provide ongoing funding for
the Development Post.  The café will also benefit from passing tourism trade during summer
months. This will help boost the local economy by supporting local businesses and
entrepreneurs whilst providing volunteer and job opportunities. 
Environmental – The project will not only reinvigorate the redundant Gordon Arms Hotel,
bringing the building back into use and encouraging new investment into the area, but the
capital works sits within the wider vision of the harbour regeneration, with the project “turning
the building around” towards the harbour; improving green space within the area and
protecting the natural environment. 
Social – A community hub can help address the social and cultural needs of the local
population. It is evident from ongoing community engagement by PCT during Covid 19 and
as we continue to recover from that pandemic that many people in the area experience
social isolation and having a community hub where they can meet and interact with others
will help combat this. Additionally, the hub will provide access to resources and services
which are not readily available in the village, such as healthcare, educational programs, and
Item 12
Page 525

Page 526

Appendix IV 
job training. This will help improve the overall well-being of the local population and boost
the local economy by supporting local businesses and entrepreneurs. Furthermore, the hub
will serve as a platform for cultural events and activities, which will help preserve the unique
identity of Portgordon and foster a sense of community pride. In summary, a community hub
can help to create a more connected and thriving community in Portgordon. 
Costs
£887,813 with a request from RCGF of an estimated £664,813 and match funding to be
confirmed in due course. 
It is intended to approach: 
Crown Estate Scotland 
The Wolfson Foundation 
The National Lottery Community Fund  
Garfield Weston 
The Robertson Trust 
William Grant Foundation 
Page 526

Page 527

Appendix V 
Tomintoul and Glenlivet Development Trust – Campsite Proposal 
Overview: Tomintoul and Glenlivet Development Trust proposal is to create a touring
style campsite just outside the village of Tomintoul. If the proposal is successful it will deliver
strong environmental, economic and social regeneration outcomes. The indicative total
project cost is £1,000,000 with a request from RCGF of £500,000 and match funding of
£500,000 in place. 
The project was submitted to Stage I for RCGF 2022/2023 but were not invited to submit an
application to Stage II. The project has been scaled back and have since secured more
funding 
Background: Tomintoul and Glenlivet Development Trust (TGDT) is an open membership
community owned and run Regeneration Company with charitable status. It was established
10 years ago and has delivered a range of capital regeneration projects and runs a number
of social enterprises delivering impact across a range of sectors.
During the preparation of the Community Plan 2018 - 2022 Tomintoul and Glenlivet
Development Trust surveyed members and the wider community to establish priorities. The
proposal for a campsite was considered one of the top three priorities and is identified in the
Community Plan as a key deliverable.
After considering a number of sites the board agreed to pursue the Lying in Field – an area
of unimproved grassland just outside the village of Tomintoul which is owned by Crown
Estate Scotland. 
What this project will actually deliver & regeneration outcomes
Having agreed on a preferred site TGDT completed a masterplan exercise including market
and economic impact analysis, draft site plans and costs and a full development and
operational business plan.
There are strong environmental, economic and social rationale for developing a touring style
campsite in Tomintoul and these are set out below
Economic - As an established tourism area in the Cairngorms National Park Tomintoul and
Glenlivet have a good accommodation market with comprehensive range of hotels, bed and
breakfasts and holiday lets. There is a noticeable lack of campsites with small offerings at
Glenlivet Hall and Tomintoul Bowling Club.
Our economic impact study estimates each pitch at the proposed development will generate
£100 of spend per day in the local area giving the site a significant impact on the local
economy. In addition the site will help TGDT achieve the ‘critical mass’ required for it to
scale up operations allowing it to deliver economies of scale across all its projects.
The development is expected to create 2 FTE operational roles.
Environmental - The environmental issues associated with wild camping are well
documented and have been experienced on the Glenlivet Estate and within the wider
Cairngorm National Park / Moray Speyside Tourism area. Waste water, rubbish and human
waste are issues experienced by Crown Estate Scotland and our community as a result of
wild camping and the lack of formal facilities has been identified as a major contributing
factor.
The development of the Lying in Field is also expected to have a positive environmental
impact on the area by improving the habitat value of the site. The CNPA response to our pre
planning application enquiry identified opportunities to improve the site with wetlands, tree
Item 12
Page 527

Page 528

Appendix V 
planting and other landscaping which would encourage greater biodiversity in the interests of
our target market visitor.
Social -The proposal to develop a campsite in Tomintoul is part of a regeneration strategy
that began with an objective to make Tomintoul and Glenlivet a better place to live and work.
TGDT and Tomintoul and Glenlivet Landscape Partnership have improved the visitor offer
with tourism infrastructure improvements, events and community enterprise such as the
Smugglers Hostel and Tomintoul Museum.
Operating as a social enterprise through our trading subsidiary the campsite will provide
TGDT with an additional source of income to increase its sustainability as a community
anchor organisation. Profits from the site will be returned to TGDT and support its core aim
of supporting a sustainable vibrant future for our community. 
Costs
Capital (estimate)    £1,000,000
Site acquisition and legal fees  £      35,000
Design and tendering    £        6,000
Business start-up   £      20,000
Total     £1,761,000 
Next steps
Community and stakeholder consultation    Complete
Site investigation and survey      Complete
Finalise design       Complete
Submit for planning       January 2023
Tendering capital works      June 2023
Finalise costs and funding      June – July 2023
Capital build phase      April 2024 – November 2024
Fit Out Phase       November 2024 – March 2025 
Page 528

Page 529

Appendix VII 
Forres Area Community Trust – Town Hall Proposal 
Overview:
Forres Area Community Trust (FACT), On completion of transforming the Town Hall it will
provide a high quality, environmentally sustainable and fully accessible mixed use facility,
capable of responding to current and future community needs with strong regeneration
outcomes. It will include performance / events space, heritage, community and visitor
information, hot-desking facility for social enterprises / small businesses and employment
and training opportunities for young people. 
The total project cost is £5,188,396 with a request from RCGF of an estimated £3 million
over 2 years and match funding from the Trust to be confirmed in due course. 
The project went to stage II of RCGF 2022/2023 but were unsuccessful due to lack of
evidence of need and delivery of additional services and resulting sustainable regeneration
outcomes 
Background
Forres Area Community Trust (FACT) is a charity & registered as Company Limited by
Guarantee. FACT began with the vision to make the Forres area a better place to live, work
& / or visit. Since 2011, FACT has a well- established track record of identifying &
responding to community needs through various initiatives including a Community Asset
Transfer of the Town Hall. 
What this project will actually deliver
Forres Town Hall will be a catalyst for regeneration in the Forres area and provide
opportunities for all to access facilities and services that will strengthen and connect
individuals, organisations and agencies, to make transformative difference in the community.
The project will be a key part of the wider plans which are being developed for the Forres
area to create a dynamic and vibrant heritage quarter in the area. This plan will transform the
High Street and town centre from an area that is in decline into a vibrant and attractive
location that will encourage people to live, work and visit, and in doing so will contribute to
social cohesion and community wellbeing. 
Upon completion in 2025/2026 the Town Hall will provide:
• An increase in facilities provided from 3 public spaces to 9 public spaces which will
result in an increase in capacity from 340 people to 560 people in total being able to
be in the building
• An accessible, sustainable facility in the town centre that will offer a performance
space for theatre shows, cinema, musical performances, conferences and events
• A co-working facility for social enterprises and small businesses
• Learning and training spaces for use by all the community
• An exhibition space for heritage, arts and commerce
• Heritage, community and visitor information
• Employment and training opportunities for young people 
• Provide opportunities for volunteering and community engagement to reduce social
isolation and increase community cohesion 
Timescales, objectives, target groups, geographical coverage, partnership,
community involvement.
If the RCGF application is successful work would commence in April 2024 with anticipated
completion date by no later than March 2026.
The objectives are:
Item 12
Page 529

Page 530

Appendix VII 
• To develop a high quality, environmentally sustainable and fully accessible mixed
use facility capable of responding to current and future community needs
• To act as a catalyst for further investment in Forres town centre by developing a
heritage quarter
• To meet the target of net zero carbon emissions by 2045 using renewable technology
to reduce their carbon footprint
• To provide inspirational and welcoming spaces for the whole community including
young people, the elderly, social enterprises and organisations where new
opportunities can be created and implemented the development and sharing of skills,
experience and information
• To create 480m2 of social enterprise, office and event space 
The project will connect local people with opportunities for volunteering, employment and
skills development. This will include older people, families, those seeking employment,
young people and those wishing to volunteer and build their skills. The venue will provide
opportunities for a diverse range of activities and FACT will continue on building the success
of community involvement and wide partnership working. 
FACT regularly undertake a programme of community engagement activities focussing on
building networks, understanding the needs of the community and increasing their resilience. 
Economic, social and physical regeneration outcomes
On completion of the physical works the Town Hall will be transformed into a building fit for
purpose. At times the building is at capacity due to the current limitations of the premises.
The regeneration of the building will enable FACT to reach more individuals and groups from
the area and from this increase their impact and reduce disadvantage. 
The project will bring additional investment to the area preserving existing jobs, creating
opportunities for new employment and increasing opportunities for young people in training
and employment in the social enterprise sector.  6 FTE posts will be preserved through the
time of construction with an additional 5 posts being created post construction.  It is also
envisaged that the project will support the creation of two apprenticeship posts within the
construction industry. 
By improving and diversifying what the area has to offer FACT will collaborate with others to
regenerate the Town Hall and provide accessible and flexible spaces that are sustainable
and avoid dereliction and the deterioration of the town centre further.   
Demonstrate consideration and contribution towards achieving the target of net-zero
carbon emissions by 2045.
The regeneration of the Town Hall aims to be a practical demonstration of how to reduce
carbon emissions and energy consumption in older buildings. FACT have commissioned an
energy efficiency survey from Zero Waste Scotland (September 2020) and this report has
indicated that carbon emissions could be reduced by 53% if the recommendations were
carried out. 
Total cost
£5,188,396with a request from RCGF of an estimated £3 million and match funding to be
confirmed in due course 
Key Project Tasks/ Milestones Date Expected
Planning in Place October 2020
Design Team Appointed  October 2020 by competitive tender
Building Warrant  applied for  August 2022
Page 530

Page 531

Appendix VII 
Business Plan v 3 completed December 2022
Secure funding from NLHF/ HES and others  November 2023
Start of the procurement process 01/02 2024 (assuming January 2024 RCGF
Award)
Major contract works awarded to principle
contractor
1/5/2024
Pre start meeting with architects and
contractors
9/05/2024
Mobilisation and construction planning 26/5/2024
Site possession and start 5/06/2024
Construction: QS works, valuations and
Interim Certificates
4 weekly through-out following advice from
architects
Building Completion and handover 31/09/2025 
Page 531

Page 532

Page 532

Page 533

REPORT TO:   ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 20 JUNE 2023 
SUBJECT:  DEPOT AND STORE REVIEW 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT
AND FINANCE) 
1. REASON FOR REPORT 
1.1 The purpose of this report is to provide an update on progress of the depot
and store review and seek approval for some initial actions in relation to early
rationalisation. 
1.2 This report is submitted to Committee in terms of Section III (F) (3) of the
Council's Scheme of Administration relating to industrial and commercial
development. 
2. RECOMMENDATION 
2.1 It is recommended that Committee:- 
(i) considers and notes the update; 
(ii) approves the progression of early rationalisation of the properties
outlined in line with the vacant and surplus procedure; and 
(iii) notes that the outline business case will be reported before 31
December 2023. 
3. BACKGROUND 
3.1 The meeting of this Committee of 6 September 2022 approved a report
providing an update on work undertaken, noted that officers had identified
potential opportunities to deliver early savings and noted a further update
would be provided once the outline business case was developed (paragraph
12 of minute refers). 
3.2 Officers have been working with colleagues to develop the outline business
case.  However, the complex interconnections with other work streams and
significant competing priorities has seen progress slowed. It is, however,
intended that the outline business case will be presented before the end of
this calendar year. 
Item 13
Page 533

Page 534

4. PROGRESS 
4.1 Engagement with services which use depots and stores has continued with a
completed workshop which has helped focus the outline business case
development. From the engagement and workshop it is clear that how the
properties are used significantly affects the ability for the Council to
rationalise, or otherwise, the properties. 
4.2 Significant outcomes from the work since September include clarity of any
properties which should be out of scope. The decision has been taken that the
Closed Records Store (CRS) and Archives should formally be out of scope
although, through the process, any opportunities to identify a long term
solution for these properties will be considered. The long term future property
requirement for the CRS and Archives will be progressed by Asset
Management once significant progress on the Depot and Store review has
been made. Further the significant interconnections between the Smarter
Working Project and the EV Charging Strategy for Council vehicles must be
included in the depot and stores review. 
4.3 In relation to the Smarter Working Project, as this project seeks to maximise
use of our offices, there will be opportunities for staff who are currently based
in depot environments undertaking tasks which can be completed in an office
environment to be relocated. The benefits for this would be ensuring staff
currently in depot environments benefit from our flexible working opportunities
and ensuring that staff have appropriate modern working environments. 
Further, there will be opportunities to reconfigure remaining sites which may
have reduced office space requirement to maximise use for their primary
depot/store purpose. 
4.4 The requirement to transition to NetZero cuts across all parts of the Council. 
However, it is a significant factor in decision making in relation to property and
vehicles. Decisions on both are medium to long term decisions due to the life
cycle of vehicles and the relatively inflexible nature of buildings. The outline
business case will therefore focus on retaining sites which are, or are able to
be, operationally efficient, health and safety compliant, deliver the service in
the correct location and can meet our NetZero objectives by either already not
having a carbon producing heat source or can be adapted at appropriate cost. 
4.5 It is clear that the transition to a non-fossil fuel vehicle fleet will be extremely
challenging, not least given that currently there are limited or no options for
some of our large specialist vehicles. How we transition our fleet could have a
significant impact on our depot requirements when the potential range of
electric vehicles, vehicle charging requirements and repair requirements are
considered. The outline business case will therefore look to incorporate
strategic recommendations on how the council addresses the charging of
Council vehicles. During the engagement so far, it is clear that some flexible/
modern/efficient working practices like staff starting work journeys from home
and working out of a stocked van are being compromised when their vehicle
is changed to an EV - with the current thinking being that the EV has to be
charged at a Council depot. The business case will seek to set guidelines on
how services can support modern ways of working with an electric vehicle. 
Page 534

Page 535

4.6 A further significant outcome from the engagement and workshop is the direct
connection between working practices and space requirements. Historically,
depot and store requirements have developed on the premise that material for
the task, equipment for the task and the task instruction must be collected
from a single depot before the task can commence. This is now not the case.
As noted above, the DLO working practices have developed to permit staff to
have a fully stocked van and an electronic device thus permitting the staff
member to start their working day from their house. This reduces dead
mileage and permits a more flexible working environment. However, this
example of using technology to improve productivity is not evident across the
various services based in depots and stores. To maximise the potential
outcome from this review, the outline business case will look to incorporate
opportunities for business development/improvement to minimise the use of
property. This will not only look at technology, but also look at equipment and
material management and storage to limit the amount of unproductive depot
and store space. 
4.7 During the engagement process the following opportunities for rationalisation
have been identified: 
Property User Relocation Annual saving
Unit H, Isla Bank
Mills, Keith
DLO Staff moved to
Mosstodloch
£34,000 (internal
rent, utilities and
rates)
Dava garage Roads No longer
used
£500 (external
rent) (note this is a
leased property
potential for
dilapidation cost
which will be
covered as a
spend to save from
the other full year
savings)
Dufftown depot Roads Services
relocated to
Keith
£7,500 (utilities)
HWRC, Conglass
Lane, Tomintoul
Waste Services
relocated to
Roads Depot
in Tomintoul
nominal
Auchinhove salt
store
Roads Replaced with
new salt store
in Keith
Nominal financial
saving, better
service delivery
and demolish to
reduce risk.         
It is recommended that the above properties progress through the vacant
surplus process with full year savings being achieved in financial year
2024/25. 
Page 535

Page 536

5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
This project forms part of the Improvement and Modernisation
Programme of Work that supports the Council priority of a financially
stable Council. 
(b) Policy and Legal
None 
(c) Financial Implications
The financial savings from the rationalisation of the depots noted above
accumulate to £42,000 from financial year 2024/25. As the business
case develops and identifies further financial savings and potential
capital spend to save projects these will be reported in the appropriate
manner. 
(d) Risk Implications
The main risk of the review is the engagement of Services and the
completion of the project. Housing and Property officers are working
with Services to ensure they have buy in to the work being undertaken
and remain engaged in a process that has been ongoing for some
time. As identified, early quick wins demonstrate delivery which should
support positive engagement. 
Planning to ensure safe movements are possible at the Tomintoul
Depot for both roads and public users of the HWRC are ongoing and
the move will not be progressed until this is completed. 
(e) Staffing Implications
The staff implications due to the moves identified by early opportunities
above have been progressed by the appropriate Service in line with HR
processes where applicable.   
(f) Property
The property implications are as detailed in this report and will be 
further detailed in future reports. 
(g) Equalities/Socio Economic Impact
There are no equalities or socio economic issues arising from this
report. However, these will be appraised within the business case. 
(h) Climate Change and Biodiversity Impacts
No climate change or biodiversity implications have been identified
relating to the recommendations of this report. However, any decisions
on the future of property assets will be heavily influenced by the
Council’s strategy. 
(i)  Consultations
The Head of Housing and Property Services, Chief Financial Officer,
Legal Services Manager, the Head of Environmental and Commercial
Services, the Equal Opportunities Officer and Lissa Rowan (Committee
Page 536

Page 537

Services Officer) have been consulted and their comments
incorporated in this report as appropriate. 
6. CONCLUSIONS 
6.1 Engagement with appropriate services has progressed which has
informed the direction of travel for the development of the outline
business case. 
6.2 There are significant interconnections between the depot and store
review and the Smarter Working project with opportunities to reduce
office space within the depot and store portfolio a priority. 
6.3 The Council EV Charging Strategy will have a significant impact on
demand for property space and to that end the strategy will be brought
into the outline business case to ensure there is a strategic approach in
relation to EV charging for Council vehicles utilised by depots and
stores. 
6.4 Early opportunities have been identified and properties specified in
paragraph 4.7 will be progressed through the vacant surplus process to
deliver financial savings. 
Author of Report:  Neil Strachan, Property Asset Manager
Background Papers:  None
Ref: SPMAN-1285234812-1330 
Page 537

Page 538

Page 538

Page 539

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 20 JUNE 2023 
SUBJECT: INFORMATION REPORT:  LIST OF PROPERTY
TRANSACTIONS CONCLUDED UNDER DELEGATED
POWERS 
BY: DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT &
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of property transactions which have been dealt with
under delegated powers. 
1.2 This report is submitted to the Economic Development and Infrastructure
Services Committee in terms of Section III F (5) of the Council's Scheme of
Administration relating to industrial and commercial development. 
2. BACKGROUND 
2.1 In terms of the Council’s Scheme of Delegation, the Head of Housing and
Property has delegated authority to grant leases, licenses or other occupation
agreements of land and buildings for 25 years or less duration where the
initial rent does not exceed £35,000 per annum and sites on long term
building leases of up to 125 years duration where the initial rent does not
exceed £35,000 per annum. 
2.2 In terms of the Council’s Scheme of Delegation, the Head of Housing and
Property has delegated authority to conduct rent reviews and fix new rents. 
2.3 In terms of the Council’s Scheme of Delegation, the Head of Housing and
Property has delegated authority to grant wayleaves or servitudes over
Council owned property. 
3. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The proposals support the aim of delivering financial stability. 
Page 539

Page 540

(b) Policy and Legal
None. 
(c) Financial Implications
The transactions detailed in APPENDICES I and II will generate an
income to the Council. 
(d) Risk Implications
None. 
(e) Staffing Implications
None. 
(f) Property
None. 
(g) Equalities/Socio Economic Impact
None. 
(h) Climate Change and Biodiversity Impacts  
None. 
(i) Consultations
None. 
4. CONCLUSION 
4.1 It is recommended that the Committee notes the 9 leases, 2 rent reviews
and 2 servitudes as set out in APPENDICES I, II and III. 
Author of Report: Stuart Beveridge, Asset Manager (Commercial Buildings)
Background Papers: 
Ref:   SPMAN-1285234812-1323 
Page 540

Page 541

APPENDIX I
REPORT TO THE ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES COMMITTEE ON 20 JUNE 2023 
LIST OF LEASES OF BUILDINGS AND SITES – SUBMITTED FOR NOTING 
1. Reference No. 
2. Officer’s Ints
1. Address 
2. Tenant
1. Building (m²) 
2. Site (Ha) 
1. Date of Entry 
2. Review Period
Rent Remarks
1. KE/3/268 
2. ALBU
1. Unit J Isla Bank Mills,
Keith 
2. Oakwood Cooperage Ltd
(SC596065)
1. 777sqm 
2. 0.094Ha
1. 16/2/23 
2. 3 years
£22,000 p.a. Permitted Use: 
Workshops & storage in
relation to cooperage &
barrel storage.
1. LO/1/204 
2. TIBA
1. Unit 4 Coulardbank
Industrial Estate,
Lossiemouth 
2. Scotstone Ltd
(SC755827)
1. 70.05sqm 
2. -
1. 1/4/23 
2. 3 years
£7,600 p.a. Permitted Use:  Storage of
stock related to tenant’s
online clothing retail
business.
1. EL/1/218 
2. TIBA
1. 14 Chanonry Road
North, Elgin 
2. Stewart Developments
(Scotland) Ltd
(SC757924)
1. 110sqm 
2. 0.01Ha
1. 1/4/23 
2. 3 years
£9,350 p.a. +
VAT
Permitted Use:  Vehicle
storage & repair. 
Page 541

Page 542

1. BD/1/204 
2. ALBU
1. Unit 4 Burghead
Harbour, Burghead 
2. Stuart Roberts
1. 58sqm 
2. 0.006Ha
1. 6/4/23 
2. 3 years
£1 Permitted Use:  Car
valeting & associated
storage.
Tenant paid 3 years rent in
advance by commuted
payment of £12,750
exclusive of VAT.
1. CL/482/2 
2. SB
1. Cullen Primary School
Nursery 
2. Teddy Bear
Developmental Group
1. 
2. 
1. 26/3/23 
2. 3 months and 1
week
N/A License to use space
during specified periods
when not required by
Council nursery.
Permitted Use:  Childcare
facility.
1. FR/410/1 
2. SB
1. Garage at rear of Forres
Community Centre,
Forres 
2. Forres Osprey Bus
1. 24.5sqm 
2. 
1. 1/2/23 
2. Month to month
£1 if asked Permitted Use:  Storage of
minibus.
1. EL/1/223 
2. TIBA
1. Unit 3, 2 Chanonry Road
North, Elgin 
2. Sara Milligan
1. 25sqm 
2. -
1. 4/5/23 
2. 3 years
£3,960 p.a. +
VAT
Permitted Use:  Office &
store for the distribution &
hire of baby carrying
equipment. 
Page 542

Page 543

1. BK/4/103 
2. ALBU
1. March Road
Development IE, Buckie 
2. Lossie Seafoods Ltd
(SC145004)
1. - 
2. 1.31Ha
1. 23/3/23 
2. 5 years
£25,600 p.a. Permitted Use: 
Development of
warehousing & factories
for food processing &
storage.
1. FR/4/204 
2. IAWA
1. 7 Waterford Circle,
Forres 
2. GS Precision
Engineering Services Ltd
1. 70sqm 
2. 0.01Ha
1. 11/5/23 
2. 3 years
£7,200 p.a. Permitted Use:  Workshop
for the tenant’s Gunsmith
business. 
Page 543

Page 544

Page 544

Page 545

APPENDIX II
REPORT TO THE ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES COMMITTEE ON 20 JUNE 2023 
LIST OF RENT REVIEWS OF BUILDINGS AND SITES - SUBMITTED FOR NOTING 
1. Ref No.
2. Valuer’s Ints.
1. Address
2. Tenant
1. Building (m²) 
2. Site (Ha)
1. Date of Entry
2. Review Period
Interval
1. Previous Rent
2. New Rent
Remarks
1. FR/565/003 
2. SB
1. Forres Mechanics FC, Mosset
Park 
2. Forres Mechanics FC
1. 
2. 
1. 16/9/19 
2. 28/11/22 and 5
yearly
thereafter
1. £5,050 p.a. 
2. £6,218 p.a.
Permitted Use:
Land for Football
Stadium.
1. EL/1/114 
2. TIBA
1. 5 Chanonry Road South, Elgin 
2. Speyfruit Ltd
1. - 
2. 0.14Ha
1. 20/6/07 
2. 5 years
1. £6,000 p.a. +
VAT 
2. £7,485 p.a. +
VAT
Permitted Use:
Storage & distribution
of fruit & vegetables. 
Page 545

Page 546

Page 546

Page 547

APPENDIX III 
REPORT TO THE ECONOMIC DEVELOPMENT & INFRASTRUCTURE SERVICES COMMITTEE ON 20 JUNE 2023 
GRANT OF SERVITUDES AND WAYLEAVES 
Officer Intls  File Ref  Address Description Price  Comments
CQ BK/750/35 Garage Site No 4, James Street,
Buckie, AB56 1RL
Servitude Right – Private Party £0 Right of access to previously
disposed Council garage site. 
CQ PK/675/5 4 Logie Drive, Portknockie,
AB56 4NF
Servitude Right – Private Party £0 Right of access to rear of
previously disposed Council
property. 
Page 547

Page 548

Page 548