Democracy Spraffa

Agenda Document Pack - Economic Development and Infrastructure Services Committee - 07/02/2023

Moray Council · 7 February 2023
Back to Economic Development and Infrastructure Services Committee — 7 February 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Economic Development and Infrastructure Services
Committee 
Tuesday, 07 February 2023 
NOTICE IS HEREBY GIVEN that a Meeting of the Economic Development and
Infrastructure Services Committee is to be held at Council Chambers, Council
Office, High Street, Elgin, IV30 1BX on Tuesday, 07 February 2023 at 09:30. 
BUSINESS 
1 Sederunt 
2 Declaration of Group Decisions and Members Interests * 
3 Minute of Meeting dated 15 November 2022 7 - 16
4 Written Questions ** 
5 Noice of Motion - Levelling Up Fund   17 - 18
6 Roads Asset Management Planning
Report by Depute Chief Executive (Economy, Environment and
Finance)  
19 - 32
7 Electric Vehicle Infrastructure Fund Strategy and
Expansion Plan
Report by Depute Chief Executive (Economy, Environment and
Finance)  
33 - 92
8 Update on Zero Emission Fleet Replacement Strategy
Report by Depute Chief Executive (Economy, Environment and
Finance)  
93 -
104
Page 1

Page 2

9 Cloddach Bridge Structural Assessment
Report by Depute Chief Executive (Economy, Environment and
Finance)  
105 -
120
10 Port Marine Safety Code Quarterly Report - Quarter 3
Report by Depute Chief Executive (Economy, Environment and
Finance)  
121 -
132
11 Use of Glyphosate to Control Weeds in Open Spaces
Report by Depute Chief Executive (Economy, Environment and
Finance)  
133 -
146
12 Moray Routes - Bright Futures
Report by Depute Chief Executive (Economy, Environment and
Finance)  
147 -
240
13 Question Time ***
Consider any oral question on matters delegated to the Committee in
terms of the Council's Scheme of Administration. 
Information Reports - Not for Discussion at this Meeting
Any member wishing to call in a noting or information report from one
meeting shall give notice to Committee Services at least 48 hours
before the meeting for which the report is published. The Notice shall
be countersigned by one other elected member and shall explain the
reason for call in including any action sought.   
Information Report - List of Property Transactions
concluded under Delegated Authority
Report by Depute Chief Executive (Economy, Environment and
Finance)  
241 -
260
Page 2

Page 3

Summary of Economic Development and Infrastructure
Services Committee functions:
Roads Authority; Lighting Authority, Reservoirs Act 1975, Public
Passenger Transport; Flood Prevention; Twinning; Piers and Harbours
and Coast Protection; Industrial and Commercial Development;
Environmental Protection; Burial Grounds; Assistance to Industry or
Commerce; Public Conveniences; Council Transportation; Catering &
Cleaning; Land Reform (Scotland) Act 2003; Countryside Amenities;
Tourism, monitoring funding from European Programmes, youth
training and employment creation scheme and provide Architectural,
Quantity Surveying, Maintenance and Allied Property Services.     
Page 3

Page 4

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how
the individual or members of the group will vote on any item(s) of business on
the Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any
relevant and competent business within the specified remits not already on the
agenda, to the Chair provided it is received by the Proper Officer or Committee
Services by 12 noon two working days prior to the day of the meeting.  A copy
of any written answer provided by the Chair will be tabled at the start of the
relevant section of the meeting.  The Member who has put the question may,
after the answer has been given, ask one supplementary question directly
related to the subject matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the
consent of the Chair. If a Member does not have the opportunity to put a
supplementary question because no time remains, then he or she can submit it
in writing to the Proper Officer who will arrange for a written answer to be
provided within 7 working days. 
*** Question Time - At each ordinary meeting of the Committee ten minutes will be
allowed for Members questions when any Member of the Committee can put a
question to the Chair on any business within the remit of that Section of the
Committee.  The Member who has put the question may, after the answer has
been given, ask one supplementary question directly related to the subject
matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than ten minutes
after the Committee has started on the relevant item of business, except with
the consent of the Chair.  If a Member does not have the opportunity to put a
supplementary question because no time remains, then he/she can submit it in
writing to the proper officer who will arrange for a written answer to be provided
within seven working days. 
Page 4

Page 5

THE MORAY COUNCIL 
Economic Development and Infrastructure Services
Committee 
SEDERUNT 
Councillor Marc Macrae  (Chair)
Councillor Amber Dunbar  (Depute Chair)  
Councillor Peter Bloomfield  (Member)
Councillor John Cowe  (Member)
Councillor John Divers  (Member)
Councillor David Gordon  (Member)
Councillor Juli Harris  (Member)
Councillor Sandy Keith  (Member)
Councillor Graham Leadbitter  (Member)
Councillor Paul McBain  (Member)
Councillor Shona Morrison  (Member)
Councillor John Stuart  (Member)
Councillor Draeyk Van Der Horn  (Member)
Councillor Sonya Warren  (Member)  
Clerk Name: Lissa Rowan
Clerk Telephone: 07765 741754
Clerk Email: committee.services@moray.gov.uk 
Page 5

Page 6

Page 6

Page 7

MORAY COUNCIL 
Minute of Meeting of the Economic Development and Infrastructure Services
Committee 
Tuesday, 15 November 2022 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor Peter Bloomfield, Councillor John Cowe, Councillor John Divers,
Councillor David Gordon, Councillor Juli Harris, Councillor Sandy Keith, Councillor
Graham Leadbitter, Councillor Marc Macrae, Councillor Paul McBain, Councillor
Shona Morrison, Councillor Draeyk Van Der Horn, Councillor Sonya Warren 
ALSO PRESENT 
Councillor Mustard (item 4) 
APOLOGIES 
Councillor Amber Dunbar 
IN ATTENDANCE 
Depute Chief Executive (Economy, Environment and Finance), Head of
Environmental and Commercial Services, Head of Economic Growth and
Development, Head of Housing and Property, Consultancy Manager, Mr W Burnish,
Senior Engineer (Flood Risk Management), Mrs D Anderson, Senior Engineer
(Transportation), Property Asset Manager, Harbour Development and Operations
Manager, Mr C Muir, Senior Officer (Economic Strategy and
Development), Principal Climate Change Strategy Officer, Ms J MacDonald,
Sustainable Travel Officer, Legal Services Manager and Mrs L Rowan, Committee
Services Officer as Clerk to the Committee.   
1         Chair
Councillor Macrae, being Chair of the Economic Development and Infrastructure
Services Committee, chaired the meeting.   
2         Declaration of Group Decisions and Members Interests 
In terms of Standing Order 20 and the Councillors’ Code of Conduct, there were no
declarations from Group Leaders or Spokespersons in regard to any prior
decisions taken on how Members will vote on any item on the agenda or any
declarations of Member’s interests in respect of any item on the agenda. 
3         Minute of Meeting dated 6 September 2022 
The Minute of the meeting of the Economic Development and Infrastructure
Services Committee dated 15 November 2022 was submitted and approved.
Item 3
Page 7

Page 8

4         Written Questions 
The Committee noted the following written question which had been submitted by
Councillor Mustard and subsequent response from the Council:  
Road Safety Measures – Roseisle  
At the public meeting held in October 2022, Roseisle residents raised their
concerns about speeding and general traffic issues within the village. Residents
asked for improved road signage and consideration by the council to reduce the
current speed limit of 50 down to 40 or 30. 
What progress has been made since this meeting to consider the residents
requests?   
RESPONSE  
We will continue to work in partnership with Police Scotland, and will carry out a
speed survey for the western approach to the crossroads in Roseisle. Specific
instances of speeding and poor driving should be channelled through Police
Scotland. The results of these surveys will be shared with the community and
Police Scotland who may choose to undertake further investigation of any non-
compliance of the speed limits. The results of the speed surveys will also inform
whether any further action is required with regards to the roadside environment.
We have limited resource for these surveys and need to have a prioritised survey
plan across Moray.  
There are no plans to change the speed limits, which have been set in line with the
council’s policy and national guidance on the setting of speed limits. Whilst we
appreciate and share a commitment to road safety, the level of incidents at the
B9013/C25E is no worse than any other rural junction.  
The use of the roads by HGVs is as to be expected of roads of this type. Following
previous concerns raised by the community, video surveys were undertaken earlier
this year which did not highlight any movements or driving behaviour that we would
not expect to occur at a junction like this. A one-way system for tankers was raised
at the public meeting and was addressed by Diageo and one of the local HGV
operators who confirmed that the roads and the access layout at the Defco
pumping station means that they have to approach from the south to carry out
appropriate and safe turning manoeuvres for their vehicles.  
In relation to improvements we have been working on a design for a footway along
the frontage of the Village Hall to assist with pedestrian movements, and are
aiming to complete the physical works this financial year. We have also removed
some ironworks which may have contributed to vibration issues with positive
feedback from residents. The Scottish Roads Maintenance Condition Survey and
other inspections do not show any defects or road profile issues. We have a
potential small scheme for surface dressing in the area, but this is subject to future
funding.  
As a supplementary question, Councillor Mustard asked if consideration could be
given to the provision of a speed indicator device and improved road signage.  
Page 8

Page 9

In response, the Head of Environmental and Commercial Services advised that
speed indicator devices are a tool used by the Service in accordance with Council
policy in relation to road safety and agreed to circulate this policy to
Members.  With regard to the provision of improved road signage, the Head of
Environmental and Commercial Services agreed to discuss this further within the
Service.    
5         Active Travel Strategy and Action Plan 
Under reference to paragraph 11 of the Minute of the meeting of this Committee
dated 7 December 2021, a report by the Depute Chief Executive (Economy,
Environment and Finance) asked the Committee to approve the Active Travel
Strategy for Moray which sets out the Council's vision and action plan over the
next 5 years for Active Travel in Moray.  
During discussion surrounding some of the active travel methods in Moray, it was
noted that the Strategy and Action Plan did not feature many initiatives in the
Buckie and Keith areas.  It was also noted that the Council had successfully taken
part in the Scottish Working Journey Challenge and it was queried why there was
no mention of this in the Strategy.  
In response, Ms MacDonald, Sustainable Travel Officer advised that there was a
lot of work taking place in the Buckie and Keith areas in relation to
promoting active travel and agreed to include further detail in relation to active
travel initiatives in Keith and Buckie within the Strategy.  Ms MacDonald further
confirmed that the Council had successfully participated in the Scottish Working
Journey Challenge and agreed to include this within the Strategy.  
During further discussion surrounding cycle paths in Moray, it was noted that often
these markings could not be clearly seen and it was queried when these would be
surveyed.  
In response, Mrs Anderson, Senior Engineer (Transportation) advised that Moray
has a few short sections of carriage way cycle paths and that she would provide
further information regarding including the provision of on carriage cycle paths
during the road markings refresh programme.  
With regard to the Vision statement of the Strategy that active travel is the
automatic, obvious choice for everyday journeys, Councillor Cowe stated that,
whilst this was the vision of the Strategy, providing cycle paths in Moray is often
hampered by land owners who resist working with local communities in achieving
an active travel route and moved that an additional recommendation be included
stating that, in the event of land owner resistance, action is taken for a public path
delineation order to obtain the necessary land in which to build an active travel
route.  
In response, the Legal Services Manager advised that the Committee were being
asked to approve the Active Travel Strategy and Action Plan and that adding this
recommendation would have an unknown financial implication for the
Council.  She advised that there were other ways in which to bring Councillor
Cowe's motion to the Council for consideration such as a further report or Notice of
Motion, where a fully informed decision could be made.  
Page 9

Page 10

On hearing the advice from the Legal Adviser, Councillor Cowe agreed to withdraw
his motion.   
Thereafter, the Committee agreed:  
(i) to note the consultation that has taken place with Stakeholders; and 
(ii) the Active Travel Strategy, as set out in Appendix 1 of the report, as the
policy position for Moray Council and as a forward programme of activity
subject to appropriate funding being available, subject to: 
• further detail being included in relation to active travel initiatives in
Keith and Buckie;
• reference being made to the Scottish Workplace Journey Challenge 
(iii) that further information be provided regarding including the provision of on
carriage cycle paths during the road markings refresh programme.   
6         Local Flood Risk Management Plan Cycle 2 Findhorn Nairn and
Speyside 2022-2028 
Councillor Cowe left the meeting at this juncture.  
Under reference to paragraph 11 of the Minute of the meeting of this Committee
dated 4 December 2018, a report by the Depute Chief Executive (Economy,
Environment and Finance) informed the Committee of the proposed publication of
the Final Report on the Local Flood Risk Management Plan for Cycle 1 and of the
Local Flood Risk Management Plan Cycle 2.  
Following consideration, the Committee agreed:  
(i) the final report on Cycle 1 for the Local Flood Risk Management Plan (the
Plan), for the Findhorn, Nairn and Speyside (FNS) Local Plan District; 
(ii) with the agreement of Highland Council, to publish the Final Report; 
(iii) the Plan for Cycle 2 for the Findhorn, Nairn and Speyside Local Plan
District; and 
(iv) with the agreement of Highland Council, to publish the Plan. 
7         Local Flood Risk Management Plan Cycle 2 North East 2022 2028 
Under reference to paragraph 11 of the Minute of the meeting of this Committee
dated 4 December 2018, a report by the Depute Chief Executive (Economy,
Environment and Finance) informed the Committee of the proposed publication of
the Final Report on the North East Local Flood Risk Management Plan for Cycle 1
and the North East Local Flood Risk Management Plan for Cycle 2.  
Following consideration, the Committee agreed:  
(i) the Moray Council content of The Local Flood Risk Management Plan (the
Plan) Final Report, for the North East (NE) Local Plan District for planning
Page 10

Page 11

Cycle 1; and 
(ii) the Moray Council content of the Plan for the NE Local Plan District for
planning Cycle 2.   
8         Update on Council Sandbag Policy and Property Protection Products 
Under reference to paragraph 8 of the Minute of the meeting of this Committee
dated 25 November 2014, a report by the Depute Chief Executive (Economy,
Environment and Finance) asked the Committee to approve a revised policy on the
issue of sandbags.  
During discussion surrounding public access to sand-bags for those affected by
flooding, it was queried whether there was any assistance available to those
tenants or home owners who could not afford to purchase sandbags.  
In response, Mr Burnish, Senior Engineer (Flood Risk Management) advised that
the Scottish Flood Forum Charity can provide support to those affected by
flooding.  
On hearing the response from Mr Burnish, it was asked that this information be
provided on the Council's website.    
In response, Mr Burnish agreed to include information regarding support available
from the Flood Forum Charity on the Council’s website.   
Thereafter, the Committee agreed: 
(i) the updated Council policy on the issue of sandbags and property protection
set out in Appendix 2 of the report; 
(ii) to note the property level protection products that were previously
sanctioned at committee are now available to purchase; and 
(iii) that information regarding support available from the Flood Forum Charity,
be included on the Council’s website.   
9         Nature Restoration Fund Long Term Plan 
Under reference to paragraph 8 of the Minute of the meeting of this Committee
dated 6 September 2022, a report by the Depute Chief Executive (Economy,
Environment and Finance) asked the Committee to approve delegated authority to
the Head of Economic Growth and Development to spend grant monies from the
Nature Restoration Fund, within the identified priority areas.  
Following consideration, the Committee agreed to: 
(i) note the challenge of achieving the full benefit of the Nature Restoration
Fund each year, due to the short timescale between receipt of the fund and
requirement for all project to be completed; 
(ii) delegate authority to the Head of Economic Growth and Development to
spend direct grant monies from the Nature Restoration Fund, within the
Page 11

Page 12

identified priority areas, for the remaining three years of the fund with
annual progress reports delivered to this Committee; and 
(iii) approve the approach outlined in Paras 5.7-5.9 of the report recognising
that staffing constraints will limit the Council’s ability to develop projects and
funding bids to protect and enhance biodiversity.   
10         Order of Business 
The Chair noted that item 9a) Climate Change Strategy Update on the
Supplementary Agenda had been issued electronically however had not been
printed for those Members who receive printed agenda copies and sought the
agreement of the Committee to take this item at the end of the meeting to allow a
short adjournment to consider the contents of the report.  This was agreed.   
11         Annual Report on Energy Strategy Actions 
Under reference to paragraph 9 of the Minute of this meeting dated 19 October
2021, a report by the Depute Chief Executive (Economy, Environment and
Finance) set out the annual energy and water performance of the Council's non-
domestic building portfolio in 2021/22.  
During discussion surrounding gas consumption for various properties within the
Council's property estate, it was queried why Buckie Swimming Pool was not
grouped within the sports facilities or secondary schools grouping.  
In response, the Property Asset Manager advised that this was how the
information had been presented historically and that he would give further
consideration on how to refer to Buckie Swimming Pool in future reporting.  
Thereafter, the Committee joined the Chair in commending the Service for the
savings achieved through the street lighting programme and thereafter agreed to:  
(i) note the Annual Energy Report for 2021/22 set out in the report; 
(ii) note that in 2021/22 the Council’s energy consumption in non-domestic
operational properties increased by 14.2%, and the energy bill increased by
19.7% (£543,809); 
(iii) approve the revisions made to the council’s Heating Policy at Appendix 2 of
a 1oC reduction in the temperature set point from 200C to 190C and to take
account of revised ventilation requirements; and 
(iv) approve the interim update of Energy Policy as set out in Appendix 1 of the
report, to align with the mandatory targets set by the Scottish Government
and agrees that officers review the Energy Policy and Strategy in order to
align its goals with the Route Map to Net Zero and the Local Heat and
Energy Efficiency Strategy (LHEES); 
(v) that consideration be given on how to refer to Buckie Swimming Pool in
future reporting.   
Page 12

Page 13

12         Economic Development Annual Review 2021-22 
Under reference to paragraph 9 of the Minute of the meeting of this Committee
dated 21 January 2020, a report by the Depute Chief Executive (Economy,
Environment and Finance) presented to Committee the Economic Development
Annual Review for 2021/22 which provided an overview of the primary economic
development activity in Moray in which Moray Council has either been a lead or
key partner.  
Following consideration, the Committee agreed to approve the publication of the
Economic Development annual Review for 2021/22 as set out in Appendix 1 of the
report.    
13         Suspension of Standing Orders 
The Chair sought the agreement of the Committee to suspend Standing Order 75
to allow the meeting to continue beyond 12.45 pm.  This was agreed. 
14         Performance Report (Economic Growth and Development Services) -
Period to September 2022 
Under reference to paragraph 5 of the Minute of the meeting of the Moray Council
dated 7 August 2019, a report by the Depute Chief Executive (Economy,
Environment and Finance) informed the Committee of the performance of the
service for the period to 30 September 2022  
Following consideration, the Committee agreed to note the: 
(i) performance in the areas of Service Planning, Service Performance and
other related data to the end of September 2022; and 
(ii) actions being taken to improve performance where required.   
15         Performance Report (Environmental and Commercial Services) -
Period to September 2022 
Under reference to paragraph 5 of the Minute of the meeting of Moray Council
dated 7 August 2019, a report by the Depute Chief Executive (Economy,
Environment and Finance) informed the Committee of the performance of the
service for the period to 30 September 2022.  
Following consideration, the Committee agreed to note the: 
(i) performance in the areas of Service Planning, Service Performance and
other related data to the end of September 2022; and 
(ii) actions being taken to improve performance where required.   
Page 13

Page 14

16         Marine Safety and Operational Update Q2 2022-2023 
Under reference to paragraph 6 of the Minute of the meeting of this Committee
dated 20 March 2018, a report by the Depute Chief Executive (Economy,
Environment and Finance) informed the Committee on matters of Marine Safety
and compliance with the Port Marine Safety Code (PMSC) for the period Q2 year
2022/23.  
Following consideration, the Committee agreed to note the safety performance,
fulfilling its function as Duty Holder under the Port Marine Safety Code.   
17         Forres Town Centre Improvement Plan - Funding Opportunity 
Under reference to paragraph 10 of the Minute of the meeting of this Committee
dated 21 June 2022, a report was submitted by the Depute Chief Executive
(Economy, Environment and Finance) in terms of the Local Government (Access
to Information) Act 1985, on the Chair certifying that, in his opinion it required to be
considered on the grounds of urgency in order to give early consideration to the
request for approval to submit applications to National Lottery Heritage Fund by
the deadline of 17 November and to Historic Environment Scotland by the deadline
of 15 December 2022.  
Following consideration, the Committee agreed to:  
(i) approve the submission of applications for the Development Phase and if
successful, to consider a further report in 2023/24 concerning submission of
applications for the Delivery Phase; and 
(ii) note that £20,000 is proposed as potential Council match funding from the
UK Shared Prosperity Fund. 
18         Question Time 
Under reference to paragraph 14 of the Minute of the meeting of this Committee
dated 6 September 2022, Councillor Warren queried where Action Logs and
Minutes from Harbour Advisory Committee meetings could be found.  
In response, the Head of Environmental and Commercial Services advised that
she would liaise with colleagues to find an accessible place to store these.  
Under reference to paragraph 17 of the Minute of the meeting of this Committee
dated 6 September 2022, Councillor Warren queried whether the Dial M Service
could be promoted within sheltered housing accommodation.  
In response, the Head of Environmental and Commercial Services advised that the
Dial M Service is promoted through community forums and that this would
continue with the use of printed materials where required.  
Under reference to paragraph 6 of the Minute of the meeting of this Committee
dated 6 September 2022, Councillor McBain sought an update in relation to the
future of Cloddach Bridge.  
Page 14

Page 15

In response, the Head of Environmental and Commercial Services advised that, as
agreed at the last meeting of this Committee, a productive meeting had taken
place where a temporary life extension project was being appraised and that this
would be circulated to community representatives and brought to the next meeting
of this committee with associated costs.  
Councillor Divers noted that only 2 levels of car parking in the St Giles car park are
currently being utilised and queried whether this would be adequate to
accommodate the Free After 3 initiative in the run up to Christmas.  
In response, the Head of Environmental and Commercial Services advised that
she was confident there would be adequate parking provision at the St Giles car
park.  
Councillor Divers queried which service is responsible for advertising on
roundabouts in Moray as this is considered to be a potential funding source.  
In response, the Head of Environmental and Commercial Services advised that
she had responsibility for this and that she would provide Councillor Divers with an
update in relation to the number of vacant advertising sites available.    
19         Climate Change Strategy Update 
Councillors McBain and Warren left the meeting at this juncture.  
Under reference to paragraph 18 of the Minute of the meeting of Moray Council
dated 6 April 2022, a report by the Depute Chief Executive (Economy,
Environment and Finance) provided an update on actions approved within the
Climate Change Strategy (CCS) for 2020-2030, consultancy studies, staffing and
next steps in order to achieve the Council's declaration of being net zero by 2030.  
Following consideration the Committee agreed to note the updates on the CCS
actions.     
Page 15

Page 16

Page 16

Page 17

Notice of Motion – Economic and Infrastructure Services Committee on 7 February
2023 
Levelling Up Fund 
Committee regrets the UK Government’s decision to allocate £0 of its £2.1 billion Levelling
Up Fund Round 2 to Moray. 
Committee commends the work of Council officers in submitting a strong  and ambitious bid
for funding that would have stimulated the regeneration of the Elgin town centre and created
jobs in the area. 
Committee instructs the Chair of Economic Development and Infrastructure Services to write
to the Secretary of State for Levelling Up to express its dismay at the decision to not allocate
any funding to Moray and to ask that it be reversed. 
Proposer: Cllr Graham Leadbitter
Seconder: Cllr John Stuart
Item 5
Page 17

Page 18

Page 18

Page 19

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES
COMMITTEE ON 7 FEBRUARY 2023 
SUBJECT: ROADS ASSET MANAGEMENT PLANNING
BY: DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE)
1. REASON FOR REPORT 
1.1 To inform the Committee of the latest road network condition information. 
1.2 This report is submitted to the Economic Development and Infrastructure
Services Committee in terms of Section III (F) 15 of the Council's Scheme of
Administration relating to the function of the Council as Roads Authority.   
2. RECOMMENDATION 
2.1 It is recommended that the Committee:- 
(i) notes the latest Road Condition Indicator (RCI) results for Moray
Council; and 
(ii) agrees that the RCI results continue to be monitored and reported back
on an annual basis to this committee; 
(iii) notes the clear commitment to the use of Road Asset Management
Planning in Moray Council.
3. BACKGROUND 
3.1 The road network represents the Council’s single largest asset and therefore
regular and adequate maintenance is vital to ensure it does not deteriorate
materially or become dangerous, and that considerable past investment is not lost.
Roads Maintenance covers those activities aimed to preserve the existing roads
asset and the gross replacement cost (GRC) has recently been valued at over
£1.678 billion. 
3.2 The network and associated asset liabilities are increasing year on year as new
developments are built and adopted. The charts highlighted in APPENDIX A
clearly show a trend in how revenue and capital budgets have significantly
reduced over a period of time yet more assets are added to the list of public
roads for the Council to maintain. This leads to increased costs of complying with
Item 6
Page 19

Page 20

statutory duties; however this has not been recognised by a corresponding
increase in budget allocation. 
3.3 In simple terms, the base allocation needs a similar enhancement if standards
are to be maintained. There is particular budget pressure on our revenue budgets
due to the steady increase in the assets over the last five years that the council is
required to maintain. 
3.4 A detailed financial modelling exercise was undertaken in 2020 which
suggested our road conditions would deteriorate to mid table ranking position
and that by 2025 significant investment would be needed to address our road
conditions from deteriorating beyond this point. However, our RCI position (as
detailed in 4.2 below) remains in a relatively healthy position and so the
previously planned staged increase of our capital budgets is felt not to be
required at this time, although the position will require careful ongoing
monitoring. 
3.5 Roads maintenance activities have four primary purposes: 
• structural maintenance to repair and maintain the fabric of the road network;
• the continued lighting of the network to support a safe and free flow for both
vehicular and pedestrian traffic;
• traffic management and road safety aspects to provide for the safe
movement of traffic, including cyclists, pedestrians and other vulnerable
groups;
• other routine functions of a reactive or environmental nature needed to
remove hazards to road users, to prevent deterioration to the fabric of the
road, and to keep the network clean and attractive. 
3.6 The condition of the council’s road network is monitored via the Scottish Road
Maintenance Condition Survey (SRMCS) which is a Scotland-wide machine-
based survey, the results of which are used to calculate a Road Condition
Indicator (RCI). The RCI provides information about which sections of a network
should be considered for planned maintenance soon, which sections should be
investigated to determine the optimum time for maintenance and which sections
are generally in a good state of repair (these three categories are colloquially
known as “red”, “amber”, and “green” lengths). 
3.7 It is worth noting how and where these (SRMCS) surveys are undertaken on the
different road classification types throughout Moray and what proportions of the
council’s network are surveyed each year. 
• A class roads - 100% / year (in one direction; alternates direction each year).
• B & C class roads - 50% / year (in one direction; alternates each time a
length of road is surveyed).
• Unclassified roads - 10% / year (in one direction). 
3.8 The RCI in Scotland is the proportion of the network falling within Red and Amber
and reported as a % figure. In simple terms, a higher percentage represents a
worse road condition. The RCI is reported to Audit Scotland every year as a
Statutory Performance Indicator and reported along with the RCI for all other
Scottish Local Authorities. 
Page 20

Page 21

3.9 This report summarises the latest RCI results and highlights what significant
factors have changed since the previous survey was undertaken. 
4. LATEST ROAD CONDITION INDICATOR (RCI) & RANKINGS (2021/23) 
4.1 Following the completion of the road condition surveys undertaken in 2022, the
council has now received the latest RCI % figures. Table 1 below details the
current RCI % figures and ranking position in comparison with other Scottish
Authorities for previous years. 
Table 1: RCI (%) and ranking position 
4.2 The ranking shown above is the Council’s position when all 32 Local Authorities
are ordered by ascending RCI, 1st ranking is the best and 32nd the worst.  A
change in ranking may be due to a change in our road condition, but can also be
due to the road condition in other authorities improving or deteriorating
depending upon how they are prioritising investment in their road network. 
4.3 The Scottish Average RCI has improved in each of the last 5 years, meaning that
overall the road condition nationwide is improving. 
4.4 It can be noted from Table 1 above that the council’s A, B & C classification
roads have all deteriorated from last year’s results as their respective RCI %
scores have increased. However, Moray’s unclassified roads network has seen a
reduction in RCI percentage of 1.7% which means that there has been an
improvement within this area. 
4.5 The whole network RCI % score has decreased slightly which again suggests
that our road condition has improved. However, it must be pointed out that the
condition of the unclassified network strongly influences the overall whole
network RCI due to this road classification representing almost half of the
overall road length in Moray. The manner in which the road surveys are
undertaken also has a bearing as only 10% of the unclassified road network is
surveyed each year in one direction of travel only (compared to 100% of A
class roads and 50% of B & C class roads). 
4.6 The scores for the unclassified class network are the most unreliable
component of the RCI (due to its small sample size), however due to our
network being almost 50% U Class, these scores can have a disproportionately
positive or negative effect on the whole network RCI. 
RCI Ranking RCI Ranking RCI Ranking RCI Ranking RCI Ranking
Whole Network 29.1% 4 30.6% 8 28.5% 6 25.5% 3 25.2% 3
A Class 28.6% 21 29.2% 20 26.6% 17 23.2% 11 24.1% 14
B Class 25.6% 13 25.8% 12 22.3% 6 18.3% 3 18.4% 3
C Class 28.1% 8 25.2% 7 21.3% 5 19.3% 4 20.6% 5
A,B,C Class 27.3% 9 26.2% 8 22.7% 6 19.7% 4 20.5% 5
Unclassified 31.1% 6 35.5% 16 35.0% 14 32.0% 11 30.3% 9
2021-232020-222019-21
Network
2018-202017-19
Page 21

Page 22

5. OUR ASSET MANAGEMENT APPROACH 
5.1 Moray’s road maintenance capital programmes of works are prepared by
taking an asset management approach which involves using robust data to
make good, informed decisions about how we manage and maintain the road
network as effectively as possible. 
5.2 The benefits of this approach are now widely recognised.  The Scottish
Government, both the previous and current administrations, have stressed the
importance of road asset management in order to deliver some of the required
public-sector efficiencies and nearly all roads authorities now either have an
asset management plan or are actively working on one. 
5.3 Asset management is an approach which focuses on getting the best long-term
value for money as opposed to a short-term approach which might prioritise
immediate repairs over preventative work to preserve the asset and extend its
life.  In taking this approach, officers look at the long-term costs and
consequences of the choices being made.  In short, asset management is all
about good, informed decision making. 
5.4 What this means for road maintenance is that officers consider over a much
longer term all the council’s roads in relation to one another when working out
which ones to maintain or repair first, rather than automatically fixing the roads
which look worst. This enables the best use of the limited resources available
but this can sometimes cause confusion when the general public see the
council working on roads that appear to be in better condition than some
others. APPENDIX B provides additional information in more detail on the
range and benefits of the treatment options available and incorporated
throughout Moray. 
5.5 Maintaining the council’s assets to current levels would require additional
investment due to inflation, network growth and normal ongoing deterioration.
The general trend in Scotland is an improving RCI - therefore the council would
most likely drop in the ranking tables despite standing still with the same RCI
figure. The annual review and mid table indicator will ensure this is monitored. 
6. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP))
Several objectives of these plans are influenced by the condition of the public
roads network. 
A Growing, Diverse and Sustainable Economy – the public road network is
used by all sections of society, to access shops and services and to transport
goods within and to and from Moray. 
Building a better future for children and young people in Moray encouraging
active travel options of walking and cycling require well maintained, and
adequately treated during the winter months, facilities. 
Empowering and connecting communities – road and footway hazards have
the potential to cause injury. Winter gritting provision contributes to making
Page 22

Page 23

communities safer. 
(b) Policy and Legal
The Council is responsible for the maintenance of 1558km of road network
which have been adopted by the Local Authority in terms of the Roads
(Scotland) Act 1984. The Act places a duty on the Local Authority to maintain
the roads, lighting units and structures so adopted, but does not prescribe the
level of maintenance to be delivered. 
The Well-managed Highway Infrastructure Code of Practice identifies good
practice, and consideration has to be given to this advice. 
(c) Financial implications
The current 10 year capital plan recognises the need for investment and this
will continue to be reviewed to reflect implications of the RCI indicators in the
future.
The increase in the network and assets that we have a statutory duty to
maintain is creating additional budget pressure on our revenue budgets. 
(d) Risk Implications
Pressure on general maintenance budgets will increase in terms of reactive
maintenance as carriageway conditions deteriorate. 
(e) Staffing Implications
There are no staffing implications as a result of this report. 
(f) Property
There are no property implications as a result of this report. 
(g) Equalities/Socio Economic Impact
There are no equalities implications as a result of this report. 
(h) Climate Change and Biodiversity Impacts
There are no direct climate change implications as a result of this report. 
(i) Consultations
Depute Chief Executive (Economy, Environment and Finance), Head of
Environmental and Commercial Services, Chief Financial Officer, Legal
Services Manager, the Equal Opportunities Officer and L Rowan, Committee
Services Officer have been consulted and any comments taken into
consideration. 
7. CONCLUSION 
7.1 The report highlights the current, most up to date, RCI position and whilst
the overall ranking confirms Moray is in a strong position at a national level
this should be treated with some caution. While the council’s A, B and C
classification roads have all seen their respective RCI index score
deteriorate, the whole network  score has improved and with this in mind, it
is suggested that the capital investment proposed within 10 year capital
plan, which is subject to full Council approval in March remains at current
levels moving forward. 
Page 23

Page 24

Author of Report: Mark Atherton, Roads Maintenance Manager 
Background Papers: 
Ref:      SPMAN-424642768-836
Page 24

Page 25

Appendix A – Revenue budget charts 
Item 6
Page 25

Page 26

Page 26

Page 27

540.000
550.000
560.000
570.000
580.000
590.000
600.000
610.000
0
100
200
300
400
500
600
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Km
Budget £000
Increasing Footways vs decreasing Capital
Footway Resurfacing Budget
Footway (Km) CAPITAL Footway  Budget
Page 27

Page 28

Page 28

Page 29

APPENDIX B - Treatment Options 
The content below aims to provide members with additional background which
explains in more detail the range and benefits of the treatment options available and
used in Moray. 
1 Treatment Options 
Carriageway maintenance treatments can be grouped in to 3 broad categories; 
• Surface Dressing 
• Resurfacing 
• Recycling / Reconstruction 
Each has a different range of benefits and costs, and some are only appropriate under
certain circumstances. 
Surface dressing 
Surface treatments include surface dressing and thin surfacing such as micro
asphalts. These all involve laying a thin layer over the top of the existing road to seal
the surface and restore grip, thereby extending the life of the road. They will also rectify
surface defects like cracks and potholes, either as part of the treatment process or
through pre-patching works done to the more significant defects in advance of the
surface treatment. 
This treatment is based on preventing damage from water getting into the road layers,
and restores surface texture to improve skid resistance.
Surface dressing doesn't add any strength to the road, but it does maintain an already
strong road in a strong condition for longer.
Surface dressing treatment costs approximately £3-5 per m2, instead of resurfacing
which can be anything from £25-50 per m2. 
Resurfacing 
Resurfacing usually involves removing and replacing the existing road surface
(although it is sometimes possible to lay the new surface on top of the old).
Resurfacing differs from a surface treatment by using a thicker layer of material;
usually at least 30mm thick and sometimes 100mm or more if several layers of the
road are replaced. 
Resurfacing restores the road surface to a new condition, removing surface problems
and most unevenness. 
Reconstruction 
Rebuilding works like recycling or reconstruction involve digging down to repair or
replace some or all of the foundation layers of the road and then putting a new surface
back on top. Limited areas of reconstruction are sometimes used to solve localised
problems as part of a resurfacing scheme. 
Item 6
Page 29

Page 30

The different treatments offer a different range of benefits. Selecting the right treatment
for a particular road will depend on many things including the condition and
construction of the road and the amount and type of traffic that use it. Each situation
is unique and a number of factors are considered to ensure road needs and treatment
are considered on its merits. 
The range of treatment options available which are commonly used throughout Moray
are highlighted in a series of photographs, see below, which provides a brief summary
of what is involved in the works. 
Surface Dressing 
Before Cracks are visible in the old
road surface – the dressing
will fill and seal these. 
After The same road during the
surface dressing process.  A
layer of hot bitumen list
sprayed fist followed by a
layer of stone chippings. 
Page 30

Page 31

Recycling 
During The recycling process
starts by breaking up
the old surface 
During The picture on the right
shows the heart of the
retread operation; the
broken up material is
remixed and leveled on
site with additional
binder to create a
suitable base for the
new surface. 
After The same location is
shown after the surface
dressing stage is
complete 
Page 31

Page 32

Resurfacing / Reconstruction 
Before The old surface was heavily
cracked because it had
become old and brittle. 
Because of the nature of the
road and the degree of
cracking, the surface
needed to be replaced, not
just sealed. 
During The first stage is to remove
the old surface, this is
carried out by a planing
machine. 
The new surface is laid by a
paving machine using hot
material delivered in
insulated lorries. The paver
lays it in an even layer out of
the back of the machine. 
After The completed surface 
Page 32

Page 33

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 07 FEBRUARY 2023 
SUBJECT: ELECTRIC VEHICLE INFRASTRUCTURE FUND STRATEGY AND
EXPANSION PLAN 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of proposals for the future operation and expansion
of the publically available electric vehicle charging infrastructure in Moray.
This report covers publically available charging infrastructure only. The
decarbonising of the Moray Council’s fleet and the requirements for
supporting electric vehicle infrastructure to service the fleet will be the subject
of a separate report to this Committee. 
1.2 This report is submitted to Committee in terms of Section II (F) (17) of the
Council's Scheme of Administration relating to traffic management. 
2. RECOMMENDATION 
2.1 It is recommended that Committee: 
(i) notes that the availability of future grant funding for the expansion
of the electric vehicle charging infrastructure is subject to having
an approved Strategy and Expansion Plan which meets the
criteria set by Scottish Government; and 
(ii) approves the draft Electric Vehicle Infrastructure Strategy and
Expansion Plan attached as Appendix 1 and grant delegated
authority to the Head of Environmental and Commercial Services
to approve the final version following any feedback received from
Scottish Futures Trust and Transport Scotland.  
3. BACKGROUND 
3.1 The Scottish Government’s Programme for Government includes a
commitment to phase out new petrol and diesel cars and vans across
Scotland by 2032. Electric vehicles are, at this time, the main solution to
providing mobility without the use of fossil fuels and are widely expected to
Item 7
Page 33

Page 34

continue to play an important role in achieving reductions in transport related
emissions. 
3.2 This report seeks approval of a draft Strategy and Expansion Plan for the
publically available electric vehicle charging infrastructure in Moray, which in
summary: 
• Identifies locations for the expansion of the publically available
charging network which would better meet future demand;
• Highlights that at new and existing charging sites, the council retains
ownership of connections to the grid; and
• Recommends that a concession based approach to the future
operation of the Council owned network is followed where private
suppliers/operators own and operate the above ground infrastructure. 
3.3 To date the provision of Council operated publically available electric vehicle
charging infrastructure in Scotland has, in the main, been through an annual
Local Authority Improvement Programme (LAIP) grant from Scottish
Government (SG). Since 2014, twenty six chargers (each with two charge
posts) have been provided in Moray through the utilisation of this grant, with a
further two chargers as part of the Low Carbon Travel and Transport funding
for the Speyside Low Carbon Hub. 
3.4 There has been no grant funding for the operation and maintenance of the
publically available chargers. The newer chargers are still covered by their 5
year warranty, which was paid for through the LAIP grant as part of the
installation costs. However, costs associated with the maintenance of the
older chargers, which are now outwith their original 5 year warranty, are met
through revenue budgets. Whilst there is some income from the chargers,
which can offset the maintenance costs, not all chargers are commercially
viable and as the assets age, maintenance costs will increase. 
3.5 In January 2022 SG published its draft Vision for Scotland’s Public Electric
Vehicle Charging Network. At the same time it announced that it would no
longer provide an annual LAIP grant to Local Authorities. SG has set up a new
£60 million fund, the Electric Vehicle Infrastructure Fund (EVIF), of which
approximately half would be from private sector investment. There was also
information regarding the withdrawal of funding for the Charge Place Scotland
‘back of office’ system, which the Council owned chargers in Moray use. SG
will be withdrawing this funding in March 2025, after which there will be a cost
to Councils for the use of this, or any other, ‘back of office’ system. 
3.6 Scottish Futures Trust (SFT) are supporting SG in the management and
delivery of the EVIF. To apply to the fund, Local Authorities are required to
prepare and submit a Public Electric Vehicle Charging Strategy and
Expansion Plan, along with a supporting Business Case. The submission of
the supporting business case is to demonstrate commercial viability of existing
charging infrastructure and of future expansion plans. SFT and SG note that
not all charging infrastructure will be commercially viable, in particular
chargers in remote rural areas where there is a lower population base. 
Page 34

Page 35

3.7 SFT provided a template for the strategy and expansion plan, along with
datasets, financial models and GIS mapping to support Local Authorities. This
approach enables SFT and SG to readily compare the strategies and
expansion plans across Local Authority areas. It also enables the direct
comparison of the Business Cases to identify which Local Authority areas will
require additional grant funding, as not all of their charging network may be
commercially viable. 
3.8 In May 2022 SG provided Local Authorities with an enabling grant to assist
with the preparation and submission of their Strategy and Expansion Plan and
the supporting Business Case. The deadline for the submission was the
beginning of December 2022. SFT were aware that submissions would still
require Committee approval and were content to receive submissions in draft.
At the time of drafting this report (December 2022), SFT had received six draft
Strategies and Business Cases for review, which cover nine Local Authority
areas, including Moray. The deadline for submission was subsequently
extended to 31 January 2023 with a continued acknowledgement that
submissions may still require Committee approval. We are currently awaiting
comments on the submission from SFT. 
4. DRAFT STRATEGY AND EXPANSION PLAN 
4.1 The draft Strategy and Expansion Plan has been developed with the
assistance of consultants, following the guidance provided by Scottish Futures
Trust. Electric vehicles and associated charging infrastructure are an evolving
area subject to change. The draft Strategy and Expansion Plan acknowledges
this and leaves scope for further development through the utilisation of future
enabling grants from Scottish Government, anticipated for financial years
2023/24 to 2025/26. 
4.2 The Strategy and Expansion Plan is required to demonstrate the Economic,
Commercial and Management Cases for the future investment in the charging
network and follow the SFT guidance, which sets out the following pre-defined
vision, outcomes and priorities: 
• A well-designed, comprehensive and people-focussed network;
• An accessible, and reliable public network of charge posts which works
for everyone;
• Supporting the principle of a ‘Just Transition’;
• Attracts private sector investment; and
• Supporting active travel and public transport choices.  
4.3 The SFT guidance also sets out the structure and information required for the
Strategy and Expansion Plan to qualify for consideration for funding. This
information includes: 
• a description of the baseline conditions;
• the modelling of the future demand for charging infrastructure;
• the locations and specification for new charging infrastructure; 
• the estimated costs; and 
• the preferred future operating model for the network. 
Page 35

Page 36

Economic Case 
4.4 There are currently 90 electric vehicle charging posts   available on the
network in Moray for use by the public, of which only 28 are Council owned
and operated. The charge posts are predominantly located within the main
settlements of Elgin, Forres and Keith, which are sited on the A96 east-west
corridor and along the A95 corridor. Other towns with fewer charge posts
include Buckie, Dufftown and Lossiemouth. The locations of the Moray
Council owned charge posts are shown below: 
Locations of Existing EV Charging Infrastructure (Council and other
Operators) 
4.5 The draft Strategy and Expansion Plan has been developed using a demand
forecasting model provided by SFT. The model takes into account population
and economic forecasts, to provide future predictions around charging
behaviour and subsequent infrastructure requirements. The forecasting was
undertaken for three scenarios, Low, Medium and High as set out in the SFT
guidance. 
4.6 Separate data was provided by SFT, which determined whether an individual
residential property had access to off-street parking. This data enabled the
identification of the areas within settlements where there may be demand for
on-street charging infrastructure e.g. in the historic areas of coastal
communities such as Cullen, Hopeman etc.   
4.7 The preferred mix of charging posts was then identified from the forecasting
information for each of the settlements in Moray. This preferred mix was
compared to the existing charge point provision (all publically available charge
posts regardless of ownership) to identify the locations where additional
Page 36

Page 37

charge posts would be required to meet the forecast demand. The total
number and mix of charge posts for Moray to meet the demand would be: 
Number of Existing and Forecast EV Charge Posts with Settlements 
Residential On-Street
(Slow)
Destination (Fast) On Route (Rapid)
Existing Forecast Existing Forecast Existing Forecast
Moray 2 82 54 71 19 70
Note: there are 90 existing charge posts across Moray, 15 of which lie out with settlement
boundaries. 
4.8 The provision of new charge posts is being considered on a staged approach
with Stage 1 focussing on expanding provision within Moray Council public car
parks and on other Council controlled parking areas. The provision and
locations for on-street charging facilities, which is a fast evolving market, will
be considered as part of Stage 2 of the Strategy and would be subject to the
provision of further enabling funding from SG. 
4.9 Preferred sites were assessed against the following criteria and given a score
for each criteria to identify the sites, which could be prioritised in terms of
meeting forecast demand and their potential commercial viability: 
• Security of location;
• Commercial charging potential;
• Power connection rating;
• Residential charging potential;
• Destination charging potential;
• On-route charging potential; and
• Electric vehicle uptake of the wider area. 
4.10 This process narrowed the number of sites down to twenty one across the
various settlements in Moray as shown in the table below, with a total of 61
charging posts provided across the sites. It should be noted that this number
is lower than the forecast demand of 141 destination/on-route charging posts
shown in Table 4.7 above.  At the present time a significant number of
publically available charge posts have been provided within supermarket car
parks, by community groups etc. and other providers will continue to look at
charging infrastructure and make their own cases. 
Stage 1 – Off-Street EV Charging Sites 
Settlement Car Park No. of Existing
Chargers
No. of Proposed
Chargers
Buckie North Pringle
Street
0 5
Buckie Cluny Square 0 2
Buckie Newlands Lane 0 4
Burghead Station Road 0 4
Cullen The Square 1 3
Dufftown The Square 0 3
Dyke The Hall 0 4
Page 37

Page 38

Elgin North Port 1 4
Elgin  Elgin Railway
Station
1* 2
Elgin Hall Place 0 4
Elgin Cooper Park 0 4
Fochabers The Square 0 3
Forres Tulloch Park 1 3
Forres Leask Road 1 3
Forres Leys Road 0 5
Keith Mid Street 0 1
Keith Innes Lane 0 1
Keith Bankers Lane 0 1
Lossiemouth Gregory Place 0 2
Lossiemouth East Beach 0 2
Lossiemouth Station Park 1 1
Total  6 61 
* existing charger owned by Network Rail 
4.11 The outline costs for each site were estimated on the basis of default costs
provided by SFT and any known site specific information. Using these outline
costs the total estimated capital cost for the preferred Stage 1 off-street sites
shown in the above table was determined as £1,652,350. 
Commercial Case 
4.12 SFT provided a spreadsheet modelling tool to determine the expected
expense and revenue from the existing and proposed future publically
available charging infrastructure. The use of this tool ensures that all Local
Authorities future applications to the EVIF are readily comparable and
provides an evidence base for the awarding of grants. 
4.13 The expected level of private investment capital is currently unknown.
However based on current and forecast low levels of utilisation of publically
available charging infrastructure in Moray, the modelling determined that there
would be limited profit to be gained by the private sector in the short/medium
term. 
4.14 There are a number of delivery options for the future operation of the
publically available charge posts in Moray, both existing and new, which have
been identified by SFT: 
1. The charging network is owned and operated by the Local Authority;
2. The charging network is owned by the Council and leased to an
operator (a ‘Landlord’ approach);
3. The charging network is owned by the Council, leased to an operator
with conditions which enable continued oversight by the Council
(Landlord plus); and
4. The charging network is operated and expanded as a contractual joint
venture, as a time limited concession where there is Local Authority
oversight. 
Page 38

Page 39

4.15 Option 4 has been identified as the most suitable operation model for Moray
Council’s chargers as it enables a more collaborative approach and greater
oversight of the delivery of the service. The chargers would be operated by
private companies on a concession basis, with the Council retaining land
ownership and the responsibility for all underground infrastructure. The
operator would operate, maintain and ultimately replace the above ground
infrastructure. 
4.16 This option would remove the on-going costs of running the chargers but
retain oversight to ensure that the operator continued to provide an
acceptable level of service, e.g. ensured that any repairs required were
undertaken within a stated time period etc. 
Financial Case 
4.17 As part of the development of the Strategy and Expansion Plan, initial
discussions were held with a number of existing Charge Point Operators
(CPOs), to determine whether there would be market interest in operating and
expanding the charging network in Moray. Whilst these operators showed an
interest in having a presence in Moray, there would be no confirmed
committed commercial interest, until a procurement exercise had been
undertaken. 
4.18 Highland, Aberdeenshire and Aberdeen City are currently undertaking such a
procurement exercise as part of their ‘Pathfinder’ project for the operation and
extension of their charging networks. Whilst this exercise is focussed
specifically on those Council areas and their plans, within the documentation
Moray has been included as a potential partner. The results of this exercise
will provide clearer evidence of interest in the north-east and highland areas of
Scotland. 
4.19 The Financial Case highlights that there are some existing and future charging
locations, which are likely to see low utilisation rates.  It is expected there
would need to be government funding in the short to medium term, to cover
initial infrastructure costs and the ongoing maintenance of some sites. It has
been assumed in the Financial Case that there would be no funding available
from Council revenue budgets to support the operation and maintenance of
the chargers. Investment by the Council is expected to be focussed on the
provision and operation of charging infrastructure to serve the Council’s fleet
vehicles, as this dedicated provision is outside the scope of the public
charging network. 
4.20 Taking into consideration the available sources of funding; the modelling
undertaken to determine the viability of the charging infrastructure; and the
forecast future demand for charging, it is expected that grant funding in the
range of £600,000 to £1,000,000 would be required to deliver the planned
Stage 1 (off-street) EV infrastructure for Moray. 
Management Case 
4.21 The final section of the Strategy and Expansion Plan sets out the governance
and management of expansion plan; the risks and their mitigation; and the
Page 39

Page 40

timetable and next steps, should funding be granted. This information
provides evidence to the funder that there would be suitably qualified and
experienced staff working on the delivery of the charging infrastructure and
partnership working with private investors. 
5. NEXT STEPS 
5.1 The draft Strategy and Expansion Plan was submitted to SFT on 6 December
2022 for their consideration and comments. As part of the submission it was
noted that approval from this Committee would be sought in February and that
there may be amendments to the plan as part of that process. 
5.2 It is anticipated that there will be further enabling funding provided for the next
three years, to further develop and implement the Strategy and Expansion
Plan. This funding will be used to identify specific sites for on-street charging
in Moray (Stage 2), and part fund a shared post within HiTRANS to enable
collaboration across a number of authorities in the north of Scotland and
across the islands. 
5.3 The HiTRANS officer would represent the Council in the ‘Pathfinder Project’
which covers Highland, Aberdeenshire and Aberdeen City councils. The
‘Pathfinder Project’ is currently advertising a Prior Information Notice (PIN)
which is seeking expressions of interest from private operators to explore
potential delivery options for delivering EV charging infrastructure.  
Collaborative working across local authorities is encouraged as part of the
Scottish Government draft vision for Scotland’s Public Electric Vehicle
Charging Network, and by being part of a wider regional approach may make
Moray more attractive to private investment. 
5.4 Depending on the outcome of the PIN, calling off any contracts set up as part
of the ‘Pathfinder Project’ could reduce the workload on officers within
Procurement and other support services within the Council. 
5.5 Subject to awarding of grant funding from the EVIF and utilising the market
information gleaned from the Pathfinder Project, the existing chargers and
new sites would be packaged up into ‘lots’, which would include a mix of
commercially attractive sites and those less so. These ‘lots’ would then be
offered either through calling off any Pathfinder Project contracts or through a
separate procurement Moray Council led procurement exercise for a future
operator and private sector investment in the network. 
6. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The Strategy and Expansion Plan sits within the approach of the council
in its Corporate Plan of looking after the world we live in, whilst
supporting the priority of creating a sustainable council through seeking
grant funding and commercial partners to provide and operate the
publically available electric vehicle infrastructure in Moray. 
Page 40

Page 41

(b) Policy and Legal
Scottish Government’s draft vision for Scotland’s Public Electric Vehicle
Charging Network sets out the future approach to funding to provide,
expand and operate the network.  The draft Strategy and Expansion
Plan and supporting Business Case have been prepared taking the draft
vision into account and following the template and guidelines, and using
the supporting data provided by Scottish Government and Scottish
Futures Trust. 
(c) Financial implications
Corporate Management Team Additional Expenditure Warning 
When the Council approved the budget for 2022/23 on 22 February
2022 (paragraph 3 of the Minute refers) it balanced only by using
reserves and one-off financial flexibilities. The indicative 3 year budget
showed a likely requirement to continue to make savings in the order of
£20 million in the next two years.   All financial decisions must be made
in this context and only essential additional expenditure should be
agreed in the course of the year.  In making this determination the
committee should consider whether the financial risk to the Council of
incurring additional expenditure outweighs the risk to the Council of not
incurring that expenditure, as set out in the risk section below and
whether a decision on funding could reasonably be deferred until the
budget for future years is approved. 
The operation and maintenance costs of the council’s existing charging
infrastructure are met through revenue budgets, utilising the income from
the charge posts. As the existing infrastructure gets older, maintenance
costs are likely to increase. 
(d) Risk Implications
Without an approved Electric Vehicle Infrastructure Strategy and
Expansion Plan the Council will be unable to make applications to the
Scottish Government Electric Vehicle Infrastructure Fund (EVIF), which
aims to provide £60m of funding to support the expansion of the
publically available charging network in Scotland. 
For EV charging sites within off-street car parks and on Council Land
which is part of ‘Common Good’ there may be a requirement to gain
Court Consent to enable a private operator to install and/or operate
above ground infrastructure. 
(e) Staffing Implications
There are no staffing implications arising from this report as the delivery
of the draft Electric Vehicle Infrastructure Strategy and Expansion Plan is
part of existing staff duties. However the delivery and implementation of
the strategy and expansion plan will require staff input from
Procurement, Legal and Property Services. These services are all
currently operating at capacity and the implementation and on-going
management of the strategy may require additional resource,
outsourcing or other work to be de-prioritised. 
Page 41

Page 42

Part of the EVIF enabling grant from Scottish Government will be used to
contribute towards a HiTrans officer acting as a shared resource to
enable collaboration across a number of authorities in the north of
Scotland and across the islands, and to represent the Council in the
Pathfinder project which covers Highland, Aberdeenshire and Aberdeen
City councils. Collaborative working across local authorities is
encouraged as part of the Scottish Government draft vision for
Scotland’s Public Electric Vehicle Charging Network. 
(f) Property
The location of existing Moray Council charging infrastructure is within
public car parks and on Council and Common Good assets. The plans
for expansion focus on locations under the control of the Council.
Community Asset Transfers (CATs) may reduce the number of locations
available. The inclusion of some sites within the Expansion Plan may
mean that they are no longer suitable for a CAT. 
(g) Equalities/Socio Economic Impact
The strategy and expansion plan has been developed following the
guidance provided by Scottish Government, Scottish Futures Trust
Public EV Charging Strategy and Expansion Plan Template. This
guidance includes specific consideration of the provision of electric
vehicle charging infrastructure on the relevant protected characteristics
in Section 4.2 of the draft Strategy and Expansion Plan, as required by
the SG guidance. New guidance on the design of charging infrastructure,
to ensure that where practical it is fully accessible, is being developed by
Scottish Government. Any new charging infrastructure will be required to
follow this guidance. 
(h) Climate Change and Biodiversity Impacts
Developing a strategy and guidance for the provision of publically
available electric vehicle charging infrastructure is one of the key actions
in the Council’s Route Map to Net Zero, which supports the Council’s
Climate Change Strategy.
Providing publically available charging infrastructure supports and
encourages the change from fossil fuelled vehicles to electric and hybrid
vehicles through addressing issues such as ‘range anxiety’ and providing
charging facilities for households with no off-street parking. The use of
electric and hybrid vehicles reduces emissions, which supports nature
recovery and the overall improvement of environments. 
(i) Consultations
The Depute Chief Executive (Economy, Environment and Finance),
Legal Services Manager, Chief Financial Officer, Equalities Officer,
Principal Climate Change Officer, Assistant Procurement Manager,
Estates Manager (Commercial Buildings) and Committee Services
Officer (L Rowan) have been consulted and their comments incorporated
into the report. 
Page 42

Page 43

7. CONCLUSION 
7.1 An Electric Vehicle Infrastructure Strategy and Expansion Plan is one of
the conditions to be met to enable applications to Scottish Government
funding for new charging facilities and for the subsidising of locations
where the provision and operation of charging infrastructure is not
commercially viable. 
7.2 Having a strategy and expansion plan will direct new charging
infrastructure to locations which support demand for charging and
identify their commercial viability, which in turn will assist in attracting
commercial operators/private investment to Moray. 
7.3 Retaining control of infrastructure sites but seeking to set up a
concession for the provision of new and operation of existing
infrastructure to commercial operators to reduce the risk to the council
and remove the requirement for revenue funding for the on-going
operation and maintenance of these Council assets. 
Author of Report: Diane Anderson 
Background Papers: Previous committee report from 8 February 2022 Charges
for Electric Vehicle Charging 
Ref: SPMAN-524642768-825 
Page 43

Page 44

Page 44

Page 45

Scottish Futures Trust
ELECTRIC VEHICLE INFRASTRUCTURE FUND
PUBLIC EV CHARGING – MORAY STRATEGY & EXPANSION PLAN 
20 January 2023 
Item 7
Page 45

Page 46

Contents
Glossary....................................................................................................................................... 1
1 Executive Summary ........................................................................................................... 2
1.1 Background & Scope ............................................................................................................... 2
1.2 Baseline Position at March 2022 ............................................................................................ 3
1.3 Vision, Outcome and Priorities ............................................................................................... 3
1.4 The Economic Case ................................................................................................................. 4
1.5 The Commercial Case .............................................................................................................. 5
1.6 The Financial Case ................................................................................................................... 5
1.7 The Management Case ........................................................................................................... 6
2 Background & Scope ......................................................................................................... 6
2.1 Study Area ............................................................................................................................... 6
2.1 Population overview ............................................................................................................... 7
2.2 Settlement Hierarchy .............................................................................................................. 9
2.3 Proportion of Housing without access to off street parking................................................... 9
2.4 Parking Areas ........................................................................................................................ 11
2.5 Method of travel to work ...................................................................................................... 12
2.6 Vehicle Groups ...................................................................................................................... 13
2.7 Charging Types ...................................................................................................................... 14
3 Baseline Position at March 2022 ...................................................................................... 17
3.1 Current Approach to Service Delivery................................................................................... 17
3.2 Electric Vehicle Infrastructure (EVI) ...................................................................................... 17
3.3 Revenue and Operations ...................................................................................................... 17
Part 1 – Public EV Charge Point Strategy ..................................................................................... 18
4 Vision, Outcomes and Priorities ....................................................................................... 18
4.1 A well-designed, comprehensive and people- focused network. ......................................... 18
4.2 An accessible, and reliable public network of charging posts that works for everyone. ..... 19
4.3 Supporting the principle of a Just Transition. ....................................................................... 21
4.4 Attracts private sector investment. ...................................................................................... 23
4.5 Supporting active and public transport choices ................................................................... 24
Part 2 - Public EV Infrastructure Expansion Plan .......................................................................... 25
5 The Economic Case.......................................................................................................... 25
5.1 Forecasting Demand ............................................................................................................. 25
5.2 Preferred Charge Point Mix .................................................................................................. 29
5.3 Site Identification and Grid Connection ................................................................................ 31
5.4 Capital Investment Pipeline & Estimated Costs .................................................................... 34
6 The Commercial Case ...................................................................................................... 35
6.1 Contract Structure and Risk Allocation ................................................................................. 35
6.1.1 Identification of Commercially Viable Sites .................................................................. 35
6.1.2 Commercial Model Approach ....................................................................................... 36
Page 46

Page 47

6.1.3 Expected Funding Requirements .................................................................................. 37
6.2 Local Authority Retained Works and Services ...................................................................... 37
6.3 Procurement Options............................................................................................................ 37
6.4 Specification, Standards & Contract Terms .......................................................................... 38
7 The Financial Case ........................................................................................................... 38
7.1 Funding sources .................................................................................................................... 38
7.2 Financial Viability of Service/Concession Type Contracts ..................................................... 39
8 The Management Case .................................................................................................... 39
8.1 Governance and Management ............................................................................................. 39
8.1.1 Evidence of Similar Projects .......................................................................................... 40
8.1.2 Project Dependencies ................................................................................................... 40
8.1.3 Governance, Organisational Structure and Roles ......................................................... 40
8.1.4 Project Plan ................................................................................................................... 41
8.1.5 Assurance and Approvals Plan ...................................................................................... 41
8.1.6 Communications and Stakeholder Management ......................................................... 41
8.1.7 Project Reporting .......................................................................................................... 42
8.2 Risk Management and Mitigation ......................................................................................... 42
8.3 Timetable and Next Steps ..................................................................................................... 43 
Page 47

Page 48

1 
Glossary
BEV Battery electric vehicle
COSLA Convention of Scottish Local Authorities
DNO Distribution Network Operator
EST Energy Savings Trust 
EV Electric Vehicle
EVI Publicly available electric vehicle infrastructure including charging
posts as well as any solar panels, battery storage and associate works.
HiTRANS Highlands and Islands Transport Partnership
PHEV Plug in hybrid vehicle
PIV Plug in Vehicle which includes BEVs and PHEVs
RCV Refuse Collection Vehicle
SCOTS Network Society of Chief Officers of Transport in Scotland (scotsnet.org.uk)
SoTC Switched on Towns and Cities
SFT Scottish Futures Trust
SPEN Scottish Power Energy Networks
SSEN Scottish and Southern Energy Networks
TS Transport Scotland 
Page 48

Page 49

2 
1 Executive Summary 
1.1 Background & Scope
Moray is a local authority area located in the north east of Scotland, Moray is located between the
Highlands and Aberdeenshire counties and the cities of Inverness and Aberdeen.
A large part of Moray’s demographic is rural areas. The local authority area contains no major cities with
its primary centre being the town of Elgin. Elgin has a population of approximately 23,000 people which
is 25% of the total population of Moray. In addition to Elgin, Moray hosts several other towns which are
considered secondary centres. Moray’s settlement hierarchy is shown below in Figure 1. 
Figure 1: Moray Settlement Hierarchy 
The figure below shows the overall existing charging infrastructure across Moray, with 23 ‘rapid’ charging
posts, 65 ‘fast’ charging posts and 2 ‘slow’ charging posts in operation at the time of writing. 
Page 49

Page 50

3 
Figure 2: Existing Charging Infrastructure in Moray 
1.2 Baseline Position at March 2022
The current electric vehicle charging posts are operated through ChargePlace Scotland. The control of
assets has been devolved to Moray Council who oversee day-to-day operations with an overarching
service and operation contract with SWARCO which encompasses the entire network, which has been
funded through Transport Scotland. This contract is currently a 2+1+1 contract with the end of the first
period in March 2025 and at this point the infrastructure will fall under the purview of Moray Council. 
1.3 Vision, Outcome and Priorities
A series of workshops have been undertaken to define 
 22nd March 2022 - Facilitated by the Moray Climate Assembly 
 23rd August 2022 - Moray Council officers and Jacobs Consultants 
Comments and key considerations discussed at both these workshops have been summarised help steer
the future vision of the EV infrastructure in Moray.  
The considerations around accessibility have been discussed and this an approach to infrastructure can
be categorised in three different ways:
Page 50

Page 51

4 
 Existing infrastructure that may not be fully accessible, which will need to be fully
communicated to the public
 New infrastructure that would adhere to government accessibility guidance
 Charging posts in specifically designated disabled parking bays, which will seek to adhere
to BSI standards
The principles of a just transition have also been discussed highlighting two key areas in Moray which will
need to be addressed to establish an equitable network and possible steps to approach them.
 Low Income terrace housing that will not have access to off street charging
 Rural areas of Moray with no council owned parking facilities
Some initial discussion has also been held with Charge  Point Operators (CPO’s) which has indicated some
interest in operating within Moray and some idea of the key factors they would consider for investing in
infrastructure.
The provision and support of public transport and active modes is an important focus within Moray
Council and considerations around how the EV infrastructure can influence Car Clubs, Mobility Hubs,
Public Transport and Active Modes. 
1.4 The Economic Case
A geospatial modelling exercise has been undertaken using Jacobs in house EV Uptake model but
incorporating key elements from the EV forecasting work undertaken by Field Dynamics. This model has
been used to predict EV growth in Moray as well as forecast an estimate of the energy requirements in
each settlement.
For the first tranche of funding the initial focus is on the most efficient use of the available council owned
car parking sites. Using the results from the geospatial modelling as well as additional qualitative
assessment around security and lighting and a power assessment using the SSEN GIS tool, a short list of
council owned sites and predicted infrastructure requirements has been identified. 
Table 1: Shortlist of sites and infrastructure requirements
Car Park Area Residential On
Street (Slow)
Destination
(Fast)
On Route
(Rapid)
North Pringle Street Buckie 2 2 1
Cluny Square Buckie 2 0 0
Newlands Lane Buckie 1 2 1
Station Road Burghead 2 2 0
The Square Cullen 2 0 1
The Square Dufftown 2 0 1
The Hall Dyke 1 2 1
North Port Elgin 1 2 1
Elgin Railway Station Elgin 1 0 1
Hall Place Elgin 1 2 1
Cooper Park Elgin 1 2 1
Page 51

Page 52

5 
The Square Fochabers 2 0 1
Tulloch Park Forres 2 0 1
Leask Road Forres 2 0 1
Leys Road Forres 2 2 1
Mid Street Keith 1 0 0
Innes Lane Keith 1 0 0
Bankers Lane Keith 1 0 0
Gregory Place Lossiemouth 1 0 1
East Beach Lossiemouth 1 0 1
Station Park Lossiemouth 0 0 1 
A costing exercise has then been undertaken on these sites assuming default SFT recommendations for
EVI Capital and Installation costs, Capital Enabling Costs and Maintenance Costs. The estimated cost of
connection to the power network is taken on a site-specific basis taken from the power assessment. 
1.5 The Commercial Case
The sites identified within the site assessment have been further reviewed as to their level of commercial
attractiveness based on forecast utilisation levels and criteria suggested through discussion with CPO’s
Moray Council does not expect to have the money to fund/continue funding and subsidise charging post
infrastructure due to various financial pressures, therefore the most appropriate approach is a concession
commercial model which will transfer the short to medium term risk to the private sector and with grant
funding to support the upfront capital costs.
Moray Council currently owns a significant amount of public infrastructure and associated DNO
connections and it is recommended that as part of a concession approach, a portfolio of council owned
assets could be offered to help leverage private investment. 
Moray Council are currently considering whether to join with the Highland/Aberdeenshire/Aberdeen City
Pathfinder project given our geographical location directly between the Aberdeenshire and Highland
which are already signed up to the project. Moray Council’s inclusion in this project would be facilitated
through HiTRANS in conjunction with several other Local Authorities in the north and north-west of
Scotland.
The Pathfinder project operates a concession/partnership model, which entails a joint approach to the
procurement process across Pathfinder members, but packages of lots are specific to the individual
regions.
An example of key contract considerations has been outlined which highlight the need to ensure a range
of standards are specified to meet Moray’s expectations for the installation and operation of future EV
infrastructure. 
1.6 The Financial Case
The expected funding sources for the delivery of Morays planned EV infrastructure expansion has been
outlined and includes Private Investment Funding and Scottish Government Grant Funding. There is
Page 52

Page 53

6 
currently no funding available from council revenue to subsidise operation of infrastructure. Capital
investment is expected to be focused on EV infrastructure to service the Councils own fleet of vehicles.
The inputs into the SFT EVI Feasibility Model have been outlined and highlight that assuming that 17 of
the 44 identified charging posts have the potential to be funded by CPO’s, then grant funding of
approximately £828,500 will be required to deliver the full proposal of EV infrastructure expansion in
council owned car parks as outlined in this Strategy and Expansion Plan. 
1.7 The Management Case
The management case sets out how the expansion project will be delivered using project management
best practice and demonstrates an appropriate governance structure and assurance framework to
oversee the project.
A risk register has been compiled highlighting a RAG assessment of the key risks to the delivery of Morays
proposed infrastructure before and after proposed mitigation.
The next steps and example timescales have been set out to deliver the project. 
2 Background & Scope
2.1 Study Area  
Moray is a local authority area located in the north east of Scotland, Moray is located between the
Highlands and Aberdeenshire counties and the cities of Inverness and Aberdeen. As shown in Figure 3
below, Aberdeen and Inverness are connected by the A96 which forms an east-west transport corridor
that runs through Moray, passing through several towns within the local authority. The rest of Moray’s
strategic road network is made up of several A class roads which run through the local authority,
connecting the main settlements and tourism areas within the local authority.
Moray is a predominantly rural council with tourism accounting for over 10% of the total employment.
There are two main tourism areas in Moray; the 45 miles of coast line located on the northern Moray Firth
coast and the Cairngorms Mountain range located to the south of the county. These tourist attractions
create an increase of trips across Moray’s strategic road network. 
Page 53

Page 54

7 
Figure 3: Moray Study Area and strategic road network 
2.1 Population overview
Mid-year population estimates data from the National Records of Scotland has been analysed to compare
population trends in Moray with those across Scotland. Table 2Error! Reference source not found.
presents the population of Moray and Scotland from 2014 to 2021. Moray has seen an increase in
population of 1.75% over this 7-year period; a slower rate of increase when compared to the Scottish
average, which saw population growth of 2.50% over the same period. 
Page 54

Page 55

8 
Table 2: Moray and Scotland Population 1 
Moray is a made up predominantly of rural areas with low population density with several small towns
and villages around the local authority. Figure 4Error! Reference source not found. shows the population
density of the different postcode areas in Moray. The figure shows that in large parts of Moray there is a
low population density between of 0-50 per km. The population in Moray is centred around larger towns
of Elgin, Forres and Buckie. 
Figure 4: Moray Population Density 2 
1 Mid-2021 Population Estimates Scotland | National Records of Scotland (nrscotland.gov.uk)
2 https://www.scotlandscensus.gov.uk/
Area 2014 2015 2016 2017 2018 2019 2020 2021
Moray 94,770 95,510 96,070 95,780 95,520 95,820 95,710 96,410
Scotland   5,347,600    5,373,000    5,404,700    5,424,800    5,438,100    5,463,300    5,466,000    5,479,900 
Page 55

Page 56

9 
2.2 Settlement Hierarchy
As noted in Section 2.1 a large part of Moray’s demographic is rural areas. The local authority area
contains no major cities with its primary centre being the town of Elgin. Elgin has a population of
approximately 23,000 people which is 25% of the total population of Moray. In addition to Elgin, Moray
hosts several other towns which are considered secondary centres. Moray’s settlement hierarchy is
shown in 
.
Figure 5: Moray Settlement Hierarchy 
2.3 Proportion of Housing without access to off street parking
The 2011 Scottish census shows that Moray contains approximately 40,062 homes with 68% of these
being houses or bungalows which are detached or semi-detached and therefore assumed to have access
to off street parking. 
Page 56

Page 57

10 
Table 3: Moray Accommodation by Household Tenure 3
Accommodation Type
Housing Stock in
Moray
Absolute %
Whole house or bungalow: Detached 14910 37%
Whole house or bungalow: Semi-detached 12579 31%
Whole house or bungalow: Terraced
(including end-terrace) 7355 18%
Flat, maisonette or apartment: Total 5071 13%
Caravan or other mobile or temporary
structure 147 0%
Total 40062 100% 
Most areas without off-street parking in Moray are concentrated in denser urban areas, including Elgin,
Forres and Keith. In comparison, there is a lower concentration of areas without off-street parking in the
less dense rural areas across Moray including Rothes, Findhorn, and Tomintoul where the population is
more dispersed. The southern areas of Moray near the Cairngorms National Park are predominately rural
in nature and exhibit higher concentrations of properties without off-street parking. This is due to lower
numbers of properties and the presence of rural terraced cottages. 
3 https://www.scotlandscensus.gov.uk/
Page 57

Page 58

11 
Figure 6: Existing Charging Posts and Limited off-street parking 
2.4 Parking Areas
Figure 7 illustrates the analysis and mapping of car parks owned by Moray Council taken from the Council
website 4 and Google Maps5. Council owned car parking areas in Moray are focused on the main towns,
villages, and tourism areas in Moray. There are clusters of council owned car parks in Elgin, Forres and
Keith as well as on the coast. 
4 http://www.moray.gov.uk/moray_standard/page_58746.html 
5 https://www.google.com/maps 
Page 58

Page 59

12 
Figure 7: Moray Council Owned Car Parks 
2.5 Method of travel to work
Table 4 shows the most common method of commuting in Moray is driving to work, with 57% of people
opting to drive over any other mode of transport.  This is higher than the national average of Scotland
which is 56%. This emphasises the reliance these residents have on private car use for commuting, and
therefore as the demand of electric vehicles in the area increases, the importance EV infrastructure grows
too. 
Table 4: Method of travel to work for those who are employed in Moray and Scotland 6
Method of travel to Work Proportion of people in employment
Moray Scotland
Driving in a car/van 57% 56%
Passenger in a car/van 6% 6%
Underground, Metro, Light Rail 0% 0%
Train 2% 4%                                                           
6 https://www.scotlandscensus.gov.uk/
Page 59

Page 60

13 
Method of travel to Work Proportion of people in employment
Moray Scotland
Bus  3% 10%
Taxi 1% 1%
Cycling 3% 1%
Walking 12% 10%
Motorcycle/Scooter 0% 0%
Other (Include. Work at home) 16% 12%
Total 100% 100% 
2.6 Vehicle Groups  
The A69 forms the main east-west transport corridor between Inverness and Aberdeen. Figure 8 shows
the estimated AADT traffic flow for several points of the A96 throughout county, this shows that the level
of traffic on the A96 varies throughout the county. 
The flows presented in Figure 8Error! Reference source not found. are grouped into the following
categories: 
 Cars – Cars, Vans, Taxis and Private Hires 
 LGVs
 HGVs and Buses 
It can aslo be seen that cars make up approximately 70% of the traffic travelling along the A69. 
Page 60

Page 61

14 
Figure 8: A96 AADT Traffic Flows 7 
2.7 Charging Types 
Figure 9Error! Reference source not found. shows the locations of existing EV charging sites in Moray. The
map has been created using data from ChargePlace Scotland, National Charge Point Registry and Zap-
Map8 and shows the overall charging infrastructure across Moray, with 23 ‘rapid’ charging posts, 65 ‘fast’
charging posts and 2 ‘slow’ charging posts in operation at the time of writing. 
In Moray, EV charging infrastructure is predominantly concentrated within the main strategic settlements
of Elgin, Keith and Forres, while rural settlements/areas have less coverage including Buckie, Dufftown,
Kinloss and Tomintoul. Charging infrastructure is also found near the main strategic routes, the A95 and
A96.
It is worth noting that there are multiple fast charging posts in some locations in the western and northern
regions of Moray including Forres and Elgin, with fewer located in Lossiemouth, Buckie and Keith. The
current distribution of charging infrastructure is expected given the population density of the areas but                                                           
7 https://roadtraffic.dft.gov.uk/local-authorities/46
8 https://www.zap-map.com/live/ 
Page 61

Page 62

15 
may also reflect limited access to off-street parking. Areas associated with a lower population such as the
southern region of Moray near the Cairngorms will have a lower demand for charging infrastructure,
however it is crucial a balanced network is provided that provides for all residents and visitors.
Figure 9: Existing Charging Infrastructure in Moray 
Figure 10 shows the existing charging posts by type with a large proportion of the charging posts in Moray
being categorised as destination charging posts rather than on route charging. Moray would benefit from
a more rapid on-route charging posts to facilitate the through traffic identified in the sections above. 
At present there are no electric vehicle charging hubs or charging forecourts in Moray. 
Page 62

Page 63

16 
Figure 10: Existing Charging Infrastructure in Moray by type
Page 63

Page 64

17 
3 Baseline Position at March 2022
3.1 Current Approach to Service Delivery
Within Moray, a network of electric vehicle charging points to encourage the use of electric vehicles
on the strategic road network are operated through ChargePlace Scotland. The control of assets has
been devolved to Moray Council and who oversee day-to-day operations.
To ensure the continued functionality of the charging post network, there is an overarching service
and operation contract with SWARCO which encompasses the entire network, which has been funded
through Transport Scotland. This contract is currently a 2+1+1 contract meaning that there is an
agreed contract on place for two years and likely two one-year extensions. The end of the first contract
is in March 2025 and at this point the infrastructure will fall under the purview of Moray Council, this
gives flexibility in the future of these existing sites and their possible inclusion in a future contract with
a commercial operator. 
3.2 Electric Vehicle Infrastructure (EVI)
The below table summarises the total EVI position and key statistics within Moray as of March 2022,
the table is based on the format within the Strategy and Expansion plan template as provided by SFT. 
Table 5: Moray Electric Vehicle Infrastructure Summary
Local Authority Area Moray
LA Tariff 0.28 per kWh
LA Tariff AC 0.28 per kWh
LA Tariff DC 0.28 per kWh
Population 96,410
Public Devices (All) 90
CPS Public 23
% Non-CPS 74%
Public Devices (50kW) + 23
% 50kW+ 26%
Run Rate Last Qtr (All) Not Available 
Run Rate Last Qtr (50kW+) Not Available  
Current Estimated Charging Sockets 116
Current EVCP per 100k Population 93
Current Opportunities per 100k Population 120
Dwellings 40062
% Off street parking 69% 
3.3 Revenue and Operations
Section 3.1 outlines the approach to service delivery of the charging post network. As Moray Council
does not own the infrastructure the only cost Moray Council covers is the cost of the service and
operation contract and the direct cost of electricity from their electricity supplier. Moray Council’s
approach to date has been not to focus on making a profit from this infrastructure only to cover
operational costs to ensure infrastructure is available for residents and tourists. 
Page 64

Page 65

18 
Since the introduction of the first public charging points owned by Moray Council in 2014, Moray
Council has leveraged a flat tariff to cover the operational costs of running the EV infrastructure. A flat
tariff is a tariff by which the consumer pays a fixed tariff for connecting to a charge post no matter the
kW’s extracted. Moray had originally been using a flat tariff of £3.80 to generate the revenue required
to cover the operational costs of the infrastructure. 
In 2021 Moray Council recognised that the flat tariff structure may not be the most appropriate way
in which to charge the EVI users. Analysis was done to compare the tariff structures with those
adopted by surrounding local Councils, in particular Aberdeenshire and Highland Councils, which
indicated there should be a review of Moray Council’s tariff structure to broadly align with their
neighbours. 
To assess the implications of transitioning away from a flat tariff, Moray commissioned a tariff review
to evaluate the financial options of alternative tariffs. This analysis was used to identify the tariff
structure which would most effectively cover the EVI costs without creating excess profit. Thus,
allowing Moray Council to provide accessible charging infrastructure with competitive and fair prices.
The analysis concluded that, given current cost and demand, a transition to a Consumption-based
tariff of £0.28 per KWh would be a financially viable option to ensure operational costs were covered. 
This new tariff has been in operation since 1 April 2022. 
Part 1 – Public EV Charge Point Strategy
4 Vision, Outcomes and Priorities
4.1 A well-designed, comprehensive and people- focused network.
Several stakeholder engagement exercises have been undertaken as part of the wider Moray Electric
Vehicle Strategy to explore the future of Moray’s EV infrastructure and its place in the wider transport
and environmental strategy. 
An initial workshop was undertaken on 22nd March 2022 facilitated by the Moray Climate Assembly.
An additional workshop was undertaken on the 23rd of August 2022, this was an internal event with
Moray Council officers and Jacobs Consultants Comments and key considerations discussed at both
these workshops in terms of the future vision of the EV infrastructure in Moray are summarised below: 
 Moray Council’s view is that our role is less about operating charging sites and making
money and more about influencing wider private investment plans to ensure an
equitable role out across the county. 
 Electric car charging points should eventually be provided at all commercial and
community parking facilities. Charging infrastructure should also be provided for
residential properties, with access to communal charging facilities available in the case
that off street parking is not available. 
 There is need to ensure equitable provision of EV infrastructure across Moray, which
needs to consider the more low-income terrace housing areas that do not have
suitable off-street parking to allow for home charging points. These locations have
been identified as part of the wider Moray EV Strategy and given the geographical
spread of the proposed site locations some of these areas will be covered by proposals.
 The focus on equitable provision also needs to consider the lack of EV infrastructure in
the more rural areas of Moray, where no council owned car parking is located. Again,
these areas have been identified as part of the Moray EV Strategy and there is
Page 65

Page 66

19 
potential to address these gaps through community engagement and the use of
community owned assets (e.g., village halls) to host infrastructure. 
 It is important to ensure accessibility of the pavement is retained with the installation
of future EV infrastructure, and there is the possibility of introducing a blanket ban on
stretching cables over the pavement from homes to roads. There are various
technology options to addressing this (e.g., bollards/coverings/gulley’s) which can be
sought during procurement exercises.
 The need for accessibility also needs to consider that no new obstacles are created due
to charging infrastructure and that accessibility is enshrined within the design and
location of EV charging posts.
 The importance of ensuring there is an element of upskilling within the community of
Moray through operators to provide local maintenance and repair staff.
 Communal Car share and E-bike facilities are already present within Moray, and they
are seen as a key resource going forward for both expanding the transition to electric
vehicles but also reducing the overall level of car ownership. 
At present there is no current sources of engagement with the wider public and EV users within Moray,
however, as part of the writing of the future Local Plan, EV considerations will be discussed in sessions
with the public within the wider context of 20-minute neighbourhoods. 
4.2 An accessible, and reliable public network of charging posts that works for everyone.
It is important to consider how future EV infrastructure will be accessible to all public groups and this
has been assessed within the Section 5 of the Wider Moray EV Strategy to identify the potential
impacts of policy or strategy choices for the provision of EV infrastructure on different protected and
health characteristics. The characteristics listed in Table 6 have been identified as characteristics that
may potentially be impacted on, whether positively and/or negatively, by the installation of EV
charging infrastructure. 
The rural nature of Moray can create social disadvantages for the communities living there due to
isolation from urban areas and services. The urban areas are more likely to have easier and more
convenient access to public EV charging posts, whereas in the rural areas, commercial operators are
less likely to install infrastructure due to the lack of perceived demand due to the less dense
population, The characteristics of gender reassignment, race, marriage and civil partnership, religion
and belief and sexual orientation are not deemed to have an impact. 
Table 6: A summary of the potential positive and negative impacts on each applicable characteristic
Characteristic  Potential Positive Impacts Potential Negative Impacts
Age EV uptake will contribute toward reducing the
occurrence of extreme weather events such as
heatwaves that disproportionally impact older
people.
People aged between 16-49 are most likely to
switch to an EV.
Trailing cables on the footway can cause a trip
hazard for both older and younger pedestrians.
Older people with less exposure to new
technology may find charging post technology
difficult to use. 
Disability  Charging posts can be installed in blue badge
bays.
Potential for innovative products that have
less impact on the surrounding footways.
Trailing cables on the footway can cause a
hazard for wheelchair users and those with sight
loss. 
Charging posts can be difficult for some disabled
people to use if not designed appropriately, i.e.,
not on a dropped kerb. 
Page 66

Page 67

20 
Characteristic  Potential Positive Impacts Potential Negative Impacts
Pregnancy &
Maternity 
Local and convenient locations allow for easier
and less stressful access for parents with small
children. 
Trailing cables on the footway can cause a
barrier for pushchairs and prams. 
Sex n/a Women could feel unsafe using charging posts at
charging hubs located in car parks or off-street
car park locations in remote and unlit areas. 
Other vulnerable
& disadvantaged
groups
Identify areas of deprivation and ensure a
geographically balanced charging post network
is provided.
Second hand car market can increase
affordability of EVs for lower income
households.
Commercial suppliers offer fully funded
solutions (including build outs and car clubs)
and can offer a solution for residents in social
housing with limited off-street parking. 
Lower income households are less likely to own
an EV due to the high cost.
Lower income households are more likely to live
in homes without access to off-street parking,
therefore must pay the cost of charging at a
public charging post. 
Car club memberships can be expensive. 
Health
inequalities 
Air quality along major roads will improve due
to EV uptake.
A reduction in extreme weather events will
also reduce pollution.
n/a 
Social &
economic 
Aims to create a balanced and fair network
across Moray
ReCharge Parklet – constrained pedestrian
spaces can be transformed by creating a
parklet that would contain EV and e-bike
charging facilities, seating, a bicycle stand etc
all within a parking bay. This would boost
levels of activity and promote social
interaction.
Potential for demand for EV charging posts in
rural areas to be low, meaning less attractive to
CPO’s installing infrastructure.
Some people may be required to use an EV for
work and therefore may incur the financial
responsibility of charging the EV using the public
network. 
Physical Health  Shift to EVs will result in improving air quality,
improving health.
No health benefits without shift from ICEs to
EVs.
Mental health &
wellbeing 
EVs are more affordable to operate. Stress associated with inability to charge EV in a
convenient/suitable location.
Access to services  n/a A lack of charging infrastructure may result in
people being unable to access services as they
are unable to charge their EV. 
There are current examples of fully accessible charging posts currently operating in the UK, such as
Duku, which are a product design consultancy based in the UK that specialises in EV charging post
infrastructure. Where feasible, Moray will seek to install new infrastructure to the highest accessibility
standards.
There may be some existing infrastructure that cannot fully meet this guidance; the key to addressing
this is to fully communicate this to users so expectations are at a correct level. The approach to
infrastructure accessibility can be categorised in three different ways, which each have a slightly
difference approach:
Existing infrastructure that may not be fully accessible, which will need to be fully communicated to
the public
New infrastructure that would adhere to government accessibility guidance
Charging post’s in specifically designated disabled parking bays, which will seek to adhere to BSI
standards
Page 67

Page 68

21 
4.3 Supporting the principle of a Just Transition.
It is important to consider how the expansion of new EV infrastructure in Moray can be introduced
while following the principles of a Just Transition and that it will evolve to become a balanced network,
offering infrastructure for all users. This has been assessed within the Section 5 of the Wider Moray
EV Strategy and initial strategies formed for addressing a just transition. Moray has a variety of
geographies within its jurisdiction and so a solution will need to be tailored for each area. 
The current picture of the EV charging post network in Moray illustrates there is a geographic
imbalance in the network as most charging posts are currently situated in the north and along the
coast. The current network favours the main settlements in Moray such as Elgin, Keith, Forres, Buckie
and Lossiemouth however, there are some gaps in the more rural areas, most notably to the south.
The following figure sets out which settlements in Moray currently have public charging infrastructure. 
Figure 11: Moray Settlement Hierarchy Split by Existing Charging Infrastructure 
The following 
Table 7 sets out the Moray settlement hierarchy and identifies which settlement currently has or does
not have public charging infrastructure. The table highlights that Elgin, the primary centre, and all
secondary centres in Moray have existing public charging infrastructure. In contrast, over two thirds
of the smaller towns and villages in Moray have no public charging infrastructure.
Page 68

Page 69

22 
Table 7: Settlement existing charging infrastructure assessment
Existing Charging
Infrastructure?
Yes No
Primary Centre Elgin 
Secondary Centres Forres, Buckie, Keith, Lossiemouth 
Small Towns and Villages Aberlour, Burghead, Craigellachie, Cullen,
Dufftown, Findhorn, Hopeman,
Portgordon, Rothes, Tomintoul.
Alves, Archiestown, Cummingston, Dallas,
Duffus, Dyke, Findochty, Fochabers,
Garmouth, Kingston, Kinloss, Lhanbryde,
Mosstodloch, Newmill, Portknockie,
Rafford, Rothiemay, Urquhart.
As part of delivering an equitable network, charging post infrastructure gaps in some of the smaller
towns and villages will need to be addressed to create a balanced network. The exact answer to these
gaps is not currently obvious, however there is a desire by Moray Council to work proactively with
community groups in these areas to understand the possibility of utilising community owned
infrastructure and the potential for a financially stable model.
However, it will not necessarily be economically viable to deliver public charging post infrastructure
in every small town and village. Instead, most EV charging should occur at private homes or where
there is existing charging post provision.
Although Moray, has relatively high access to off street parking for home charging, there are several
locations with a low % of off-street parking as outlined below in 
Figure 12. 
Page 69

Page 70

23 
Figure 12: Access to Off Street Parking within Moray
The areas of Moray which will not have access to home charging, are often terrace housing where
households are typically on lower incomes and do not have access to a drive. A lack of off-street
parking creates more demand for on-street parking and therefore an inconvenience if the on-street
EV charging post cannot be accessed. To ensure a Just Transition, consideration will need to be given
to future provision of on-street parking to cover areas with no access to home charging and how the
tariffs can impact the transition to a fair and equitable network. 
For low-income areas, with limited off-street parking, some will be addressed by the council owned
car parking sites identified in this business case for future infrastructure, as this has been assessed
with a view of geographical balance by settlement. Going forward, it is expected that a demand led
approach will be followed, responding to requests for infrastructure. 
4.4 Attracts private sector investment.
We understand the importance of private sector investment to expand the future EV infrastructure
within Moray. There are a few factors which can be used to attract and leverage private sector
investment which are outlined below: 
 Moray Council’s preference is to retain the connection of the EVCI and therefore
initially cover electricity costs. This will then be passed onto the operator.
 There is the option to package up the existing 27 assets once the contract ends in
March 2025 within a singular package as part of a future CPO contract, in line with
approaches around other Scottish local authorities. Assets are currently devolved but
will be returned to Council ownership once the contact ends. There is a maintenance
Page 70

Page 71

24 
contract with SWARCO in place for most sites, which has recently been extended until
June 2023.
 The current EV infrastructure within Moray is Open Charge Point Protocol (OCPP) 1.6
compliant, with an upgrade to OCPP 2.0 currently being undertaken and so meet the
industry standard.
 Moray’s preference will be a portfolio approach which seeks to offer high utilisation
sites alongside low utilisation sites to enable wider infrastructure coverage, this is line
with the approach being undertaken in the Highland/Aberdeenshire/Aberdeen City
Pathfinder project.
As part of the wider Moray EV Strategy some information gathering, and soft market testing has been
undertaken through conversations with charging post operators. Conversations were held on a 1 to 1
basis with SWARCO, Ubitritcity, LibertyCharge, Trojan Energy, ChargePoint and Instavolt. These
discussions indicated that there is some interest in operating within Moray while acknowledging the
rural nature of some parts of the county. Some of the key points from these conversations in relation
to attractiveness are outlined below: 
 Preference for longer term contract, with 15+ years noted by several CPOs.
 Acknowledgement that there will be a need to address areas with low utilisation as
part of any offer.
 There is initial indication that a portfolio led approach would be acceptable, with a mix
of high and low utilisation sites. High level quotes of % of low utilisation sites in
conversations have been in the region of 10-15%
 Possible opportunities for profit share and/or site rental agreements with the council
 Several CPO’s offer potential for investment and fully funded models, high level
discussions around the key factors that would influence the decision to invest is related
to population, local amenities, vicinity to major roads.
 Rapid charging posts specifically are broadly seen as more commercially attractive to
operators if they meet the factors listed above. 
4.5 Supporting active and public transport choices
The provision and support of public transport and active modes is an important focus within Moray
Council and is a key objective within the Active Travel Strategy (2022 – 2027) and Local Transport
Strategy (2011). There are several ways in which the location of EV charging posts in Moray can
support these aspirations. It is important that EV uptake does not detract from active travel and/or
public transport, which should remain the priority. 
Car clubs
The Moray Car share scheme was founded in 2007. The community-based car club’s mission is to
provide convenient and affordable transport options that minimise environmental damage and
encourage social cohesion. The scheme enables users to book and drive in Findhorn, Forres, Kinross,
and Aberlour/Craigellachie. A third of the fleet is electric and all other vehicles are low emission. There
are now 15 vehicles available and over 300 members. The Moray E-bike scheme also sits alongside
this, allowing users to travel greater distances in comparison to regular cycling. 14 E-bikes can be
found in Findhorn, Forres, Kinross, and Aberlour/Craigellachie. 
Mobility hubs
Page 71

Page 72

25 
There are currently no mobility hubs operating within Moray, however they should be considered as
part of the future strategy. Mobility hubs are highly visible, safe, and accessible spaces where public,
shared, and active travel modes are co-located alongside improvements to public realm and where
relevant enhanced community facilities. The redesign and reallocation of space from the private car,
is intended to enhance the experience of travellers as well as benefiting residents and businesses.
As noted, E-car clubs and mobility hubs will be considered to complement EV charging post
infrastructure and not embed EV dependency. 
Public Transport
As noted above, mobility hubs should be considered, and these often are located around rail stations
or other public transport interchanges. There is a need for the level of parking to be considered and
managed at public transport interchanges, and this could include prioritising space for EVs, and/or car
clubs. There is a need to strike a balance between encouraging public transport uptake, walking, and
cycling, whilst also providing space for cleaner vehicles for those that need to drive to access public
transport nodes. There has been some provision for increased EV infrastructure in public transport
parking locations at Elgin Rail Station in the Economic Case.
Moray Council currently have plans to transition their bus fleet to electric and will progress the
transition as more EV charging posts are installed. Demand Responsive Transport is a key
consideration for enabling public transport to the more rural areas of Moray and charging post
infrastructure at key locations will be needed to enable this. 
Active modes
To support active modes of travel, the location and nature of future infrastructure, especially on street
charging posts, should be considered to ensure there are no adverse impacts on the paths of
pedestrians or cyclists. At public transport interchanges, accessibility for those walking and cycling
should be the priority and the most convenient options.
Moray Council’s Active Travel Strategy highlights the importance on building upon recent walking and
cycling growth, especially in the main settlements where many journeys can be less than 5km.
However, the rural nature of many parts of Moray means that a certain level of personal car use will
still be expected in the smaller, less accessible villages. 
Part 2 - Public EV Infrastructure Expansion Plan
5 The Economic Case
5.1 Forecasting Demand  
A forecast modelling exercise has been undertaken to provide future predictions around charging
behaviour and subsequent infrastructure requirements.  This provides a quantitative output at various
levels of disaggregation to give more context for the wider EV strategy and predicted infrastructure
requirements. Full details of the modelling process and outputs can be found within Section 7 of the
wider Moray EV Strategy, which will be provided alongside this bid document.
The forecasting has been undertaken for three distinct scenarios for ‘Low’, ‘Medium’ and ‘High’ uptake
apply the Government policy targets, banning different vehicle types in 2030 and 2035, and the
varying levels of expected ULEV (PHEV) and ZEV (BEV) uptake on the following basis: 
Page 72

Page 73

26 
 High – assumes an optimistic ZEV (BEV) uptake, at the upper end of the projected
range, reaching 100% of all new car sales by 2030
 Medium – assumes a more moderate ZEV (BEV) uptake, in the middle of the projected
range, reaching 100% of all new car sales by approximately 2032 
 Low – assumes that ZEV (BEV) uptake will be at the lower end of the projected,
reaching 100% of all new car sales by approximately 2035. This is the latest by which all
new vehicles will be ZEV (BEV)
To determine if an individual household had a parking space or not, the supplied data from Field
Dynamics which had pre-labelled each UPRN in Moray by the number of parking spaces was used. A
UPRN is a Unique Property Reference Number, and is a single unique number assigned to every
property in the UK. The publicly available UPRN data includes all commercial properties, whilst the
data provided by Field Dynamics had been pre-filtered to just residential. This allowed both
identification of the residential properties, determine if they needed on-street charging and, by a cross
comparison with the global UPRN list, identify non-residential properties in Moray.
Figure 13 below shows the distribution of electric vehicles in Moray, forecasted through to 2035 using
the geospatial modelling tool. The figure shows that the greatest increase in vehicle numbers occurs
in the 2025 to 2030 period. 
Page 73

Page 74

27 
Figure 13: Spatial Uptake Forecasting
In 
Page 74

Page 75

28 
Figure 14Error! Reference source not found. we can see the overall forecast energy demand for
Moray across the different scenarios, keepership, and body types. The total energy demand reaches
approximately 5 GWh per year in 2045. 
Figure 14: Energy Forecasts 
For the future need for EV provision in Moray, the energy forecasts have been used to estimate the
energy requirements for different types of charging speeds across Moray in 2026. This has been done
by predicting the annual kWh at each of the available council owned sites for three different use cases. 
Page 75

Page 76

29 
 Residential Charging: This uses an assumed vehicle km driven per year, combined with
vehicle efficiency, to derive an overall energy demand. This is then proportionally
distributed to those sites with no off-street parking.
 Destination Charging: Similarly, to Residential Charging, this generates an assumed
energy for destination charging, based on the likely movement patterns.
 On Route Charging: This assumes that all current expected on-route charging is
distributed amongst those charging posts near the main roads. 
5.2 Preferred Charge Point Mix
As noted in the previous section outlining of the forecasting work undertaken in Moray, energy
requirements by charging speed have been forecast for Moray on a settlement basis and this has been
translated into charge post infrastructure in order to present an estimate of the total required charge
post types by settlement in 2026, which has been outlined below in Table 8. 
Table 8: Predicted charge post requirements by Settlement
Moray Settlement
Residential
Off Street
(Slow)
Residential On
Street (Slow)
Destination
(Fast)
On Route
(Rapid)
Aberlour 3 2 2 2
Alves 3 2 2 2
Archiestown 2 2 2 2
Buckie 9 3 2 2
Burghead 7 2 2 2
Craigellachie 2 2 2 2
Cullen 4 2 2 2
Cummingston 2 2 2 2
Dallas 2 2 2 2
Dufftown 4 2 2 2
Duffus 2 2 2 2
Duffus/Cummingston 2 2 2 2
Dyke 2 2 2 2
Elgin 35 7 3 2
Findhorn 5 2 2 2
Findhorn/Kinloss 2 2 2 2
Findochty 3 2 2 2
Fochabers 5 2 2 2
Forres 16 5 2 2
Garmouth 3 2 2 2
Hopeman 6 2 2 2
Keith 6 3 2 2
Kingston-on-Spey 2 2 2 2
Kinloss 6 2 2 2
Page 76

Page 77

30 
Lhanbryde 6 2 2 2
Lossiemouth 10 4 2 2
Mosstodloch 5 2 2 2
Newmill 2 2 2 2
Portgordon 3 2 2 2
Portknockie 3 2 2 2
Rafford 3 2 2 2
Rothes 3 2 2 2
Rothiemay 2 2 2 2
Tomintoul 2 2 2 2
Urquhart 3 2 2 2 
The forecast infrastructure which represents public EV charging has then been compared to the
existing infrastructure within Moray as below: 
Table 9: Predicted and existing charge post requirements by Settlement 
Moray Settlement
Residential On Street
(Slow) Destination (Fast) On Route (Rapid)
Existing Forecasted Existing Forecasted Existing Forecasted
Aberlour 0 2 4 2 3 2
Alves 0 2 0 2 0 2
Archiestown 0 2 0 2 0 2
Buckie 0 3 6 2 3 2
Burghead 0 2 0 2 2 2
Craigellachie 0 2 2 2 0 2
Cullen 0 2 2 2 0 2
Cummingston 0 2 0 2 0 2
Dallas 0 2 0 2 0 2
Dufftown 0 2 2 2 0 2
Duffus 0 2 0 2 0 2
Duffus/Cummingston 0 2 0 2 0 2
Dyke 0 2 2 2 0 2
Elgin 0 7 14 3 3 2
Findhorn 0 2 4 2 0 2
Findhorn/Kinloss 0 2 0 2 0 2
Findochty 0 2 0 2 0 2
Fochabers 0 2 0 2 0 2
Forres 0 5 6 2 0 2
Garmouth 0 2 0 2 0 2
Hopeman 0 2 0 2 1 2
Keith 0 3 6 2 5 2
Page 77

Page 78

31 
Kingston-on-Spey 0 2 0 2 0 2
Kinloss 0 2 0 2 0 2
Lhanbryde 0 2 0 2 0 2
Lossiemouth 2 4 0 2 0 2
Mosstodlock 0 2 0 2 0 2
Newmill 0 2 0 2 0 2
Portgordon 0 2 2 2 0 2
Portknockie 0 2 0 2 0 2
Rafford 0 2 0 2 0 2
Rothes 0 2 2 2 0 2
Rothiemay 0 2 0 2 0 2
Tomintoul 0 2 2 2 2 2
Urquhart 0 2 0 2 0 2
This is summarised as across the entirety of Moray County in Table 10 below: 
Table 10: Summary of forecast infrastructure requirements across Moray
Location
Residential On Street
(Slow) Destination (Fast) On Route (Rapid)
Existing Forecasted Existing Forecasted Existing Forecasted
Moray County 2 82 54 71 19 70 
This forecasting highlights the need for more public infrastructure across various speed types that will
be needed to meet the predicted demand in 2026. Note, the total number of existing charge posts
mentioned here is 75 which is 15 less than mentioned above in Section 2.7. This is because 15 charge
posts fall outside the settlement boundaries. 
5.3 Site Identification and Grid Connection
The introduction of new EV infrastructure within Moray is being considered as a stepped approach,
with the initial step being on the most efficient use of the available council owned car parking sites.
As noted within the Section 4.3, there will be a need to address EV infrastructure needs in both low-
income areas with limited access off street parking and rural areas that do not contain council owned
parking locations in future, and these will be addressed in future funding tranches.
The work undertaken in section 9 of the wider Moray EV Strategy has formed the foundation for the
site identification in this document and full details of the assessment can be found within that
document. The strategy makes used of available forecasting modelling to score a longlist of council
owned sites using the following categories: 
Table 11: Site Assessment Categories
Criteria Description
Security of Location  Sites were scored 1-3 for security based on factors such as lighting,
fencing, security barriers, CCTV, and proximity to surrounding
developments. Sites scoring 3 were most secure, whilst sites scoring 1
were least secure and lacked the listed security measures.
Page 78

Page 79

32 
Commercial Charging Potential Sites were scored 1-3 on their potential for conflict with current and
future commercial charging post investment. Sites located near current
charging posts, or close to companies with future plans for charging post
investment such as Shell and BP scored lower.
Power Connection Rating Following an assessment on the implementation of costs for each site,
sites were scored using a red-amber-green (RAG) approach, red being the
costliest (above £30k), amber being medium (between £10k and £20k)
and green being the least costly likely to be less than £10k).
Residential Charging Potential The expected charging demand that would be driven by lack of access to
off-street residential parking.
Destination Charging Potential  Proximity to key facilities such as retail and employment locations.
On-Route Charging Potential Whether the site is near routes used by fleet vehicles and/or high
volumes of traffic.
EV Uptake of Wider Area Projected EV uptake of the Data Zone Area and travel catchment. 
The resulting shortlist of sites and their related scoring is outlined below in Table 12.
Table 12: Short Listed Site Assessment and Scoring
Car Park Area Spaces Total
Score
Residential
Demand
On-
Route
Demand
Destination
Demand
EV's
in
Wider
Area
Security Commercial
Conflicts
North Pringle
Street Buckie 35 11 2 1 2 2 2 2
Cluny Square Buckie 67 10 1 1 2 2 2 2
Newlands
Lane Buckie 81 9 1 1 2 2 2 1
Station Road Burghead 20-50 12 3 1 1 2 2 3
The Square Cullen 37 13 3 3 1 1 2 3
The Square Dufftown 12 13 3 3 1 1 2 3
The Hall Dyke 28 12 3 2 1 1 2 3
North Port Elgin 98 14 2 3 3 3 2 1
Elgin Railway
Station Elgin 56 15 3 2 3 3 3 1
Hall Place Elgin 29 16 3 3 3 3 3 1
Cooper Park Elgin 110 13 1 3 3 3 2 1
The Square Fochabers 23 13 3 3 1 1 2 3
Tulloch Park Forres 76 12 1 3 1 1 3 3
Leask Road Forres 66 13 2 3 1 2 3 2
Leys Road Forres 61 11 1 2 1 2 2 3
Mid Street Keith 42 14 3 2 3 2 2 2
Innes Lane Keith 37 14 3 2 3 2 2 2
Bankers Lane Keith 16 14 3 2 3 2 2 2
Gregory Place Lossiemouth 50-100 12 2 1 2 3 1 3
East Beach Lossiemouth 20-50 11 3 1 1 2 1 3
Station Park Lossiemouth 20-50 11 1 1 2 2 2 3 
Page 79

Page 80

33 
A detailed power assessment has been undertaken on the shortlisted sites using the SSEN GIS tool and
the publicly available network data. The GIS tool shows the map of the existing low voltage
infrastructure (substations, lines/cables etc) while the public data source reveals the available power
capacity in the low voltage substations. This has highlighted the costs ranges below on a site basis. 
Table 13: Shortlisted Sites Power Assessment
Car Park Area
Power
Assessment
(50 and 100
kVA demand)
North Pringle Street Buckie 20.4k - 26.4k
Cluny Square Buckie 1.9k - 13.4k
Newlands Lane Buckie 8.9k - 16.4k
Station Road Burghead 29.4k - 35.4k
The Square Cullen 17.9k - 20.9k
The Square Dufftown 17.9k - 20.9k
The Hall Dyke 15.3k - 19.8k
North Port Elgin 1.9k - 10.9k
Elgin Railway Station Elgin 1.9k - 15.3k
Hall Place Elgin 13.4k - 19.4k
Cooper Park Elgin 30.8k+
The Square Fochabers 17.9k - 20.9k
Tulloch Park Forres 3.9k - 16.8k
Leask Road Forres 10.9k - 24.3k
Leys Road Forres 10.9k - 19.8k
Mid Street Keith 26.3k - 30.9k
Innes Lane Keith 19.3k - 23.8k
Bankers Lane Keith 24.9k - 29.4k
Gregory Place Lossiemouth 32.8k - 37.3k
East Beach Lossiemouth 36.2k
Station Park Lossiemouth 29.4k - 36.8k 
With these sites identified, a further qualitative assessment has been undertaken looking at
geographical balance, power cost, existing and potential future commercial site infrastructure (BP and
Page 80

Page 81

34 
Shell Service Stations, Supermarkets, and other retail) to identify the best use of the shortlisted sites
on a settlement basis. The modelled energy requirement forecasting has also been undertaken at a
site level to provide a predicted number of charging post types required in 2026 as well as levels of
utilisation. This results in the following list in Table 14 which has been used to populate the SFT EVI
Feasibility Model. 
Table 14: Shortlisted Sites Forecast Infrastructure Requirements
Car Park Area Residential On
Street (Slow)
Destination
(Fast)
On Route
(Rapid)
North Pringle Street Buckie 2 2 1
Cluny Square Buckie 2 0 0
Newlands Lane Buckie 1 2 1
Station Road Burghead 2 2 0
The Square Cullen 2 0 1
The Square Dufftown 2 0 1
The Hall Dyke 1 2 1
North Port Elgin 1 2 1
Elgin Railway Station Elgin 1 0 1
Hall Place Elgin 1 2 1
Cooper Park Elgin 1 2 1
The Square Fochabers 2 0 1
Tulloch Park Forres 2 0 1
Leask Road Forres 2 0 1
Leys Road Forres 2 2 1
Mid Street Keith 1 0 0
Innes Lane Keith 1 0 0
Bankers Lane Keith 1 0 0
Gregory Place Lossiemouth 1 0 1
East Beach Lossiemouth 1 1 0
Station Park Lossiemouth 0 1 0 
5.4 Capital Investment Pipeline & Estimated Costs
The costs for the installation of the EV infrastructure identified during the site assessment have been
formulated with the below assumptions:
Page 81

Page 82

35 
 Selected sites are council owned and therefore assumed unlikely to need access/land
purchase costs.
 Default costs provided by SFT have been used for EVI Capital and Installation costs,
Capital Enabling Costs and Maintenance Costs.  The default costs provided by SFT have
been compared to costs derived from market experience and were found to be similar. 
 The estimated cost of connection to the power network is taken on a site-specific basis
taken from the power assessment shown in Section 5.3.  For 7kW and 22kW
infrastructure the lower boundary given in Section 5.3 is taken, for robustness of
financial assessment if this value is lower than the default values provided SFT, then
the default cost has been used. For 50kW infrastructure the midpoint of the values
given in Section 5.3 has been used.
This results in the following base values as outlined in Table 15. 
Table 15: Base cost assumptions
Charging Post Type
EVCP Capital
EVI +
Installation
Costs (ex VAT)
DNO Costs
Capital
Enabling
Costs
Maintenance
Cost
7 kW (Residential) £5,650.00 Site specific £2,200.00 £400.00
22 kW (Destination) £6,000.00 Site specific £2,200.00 £400.00
50 kW (On Route) £33,400.00 Site specific £4,000.00 £1,800.00 
EV infrastructure in Moray. The total estimated cost of all 44 charging posts in this proposal is
£1,595,950. 
A detailed cost breakdown on an individual site basis is provided in the SFT EVI Feasibility Model which
is included alongside this strategy and expansions plan. 
6 The Commercial Case
6.1 Contract Structure and Risk Allocation
6.1.1 Identification of Commercially Viable Sites
As outlined in Section 5.3, a site assessment has outlined the best use of council owned car parking
sites in order to meet predicted demand for the future EV infrastructure in Moray.
The expected level of private sector investment capital is currently unknown, however based on
current and forecast low levels of EV infrastructure utilisation in Moray, there is limited profit to be
gained by the private sector in short/medium term. Discussions with CPO’s have also identified specific
criteria around charging post type and location that are preferable for in order to provide investment.
In order to estimate the proposed need for grant funding for EV infrastructure that is unlikely to attract
commercial investment, a further assessment has been undertaken utilising the feedback that has
been received from CPO’s in terms of the attributes of sites which are commercially attractive, as
outlined in Section 4.4, as well as predicted utilisation levels from the forecast modelling 
The expected utilisation for the sites has come from the medium uptake scenario, as set forth in
Section 5.1 and with more detail provided in the wider Moray EV Strategy, with the outputs produced
Page 82

Page 83

36 
for the base year of 2024. This results in an assumption that 17 charging posts have potential to be
funded from CPO’s and 27 will require grant funding.
The sites identified as not being expected to be able to be attract a fully funded approach via
commercial investment have been input into the SFT EVI Feasibility Model, which shows the output
below in Figure 15 for dividends, retained earnings and retained cash. Further details of the inputs
into the SFT EVI Feasibility Model can be found in Section 7 
Figure 15: Dividends, retained earnings, and retained cash from the SFT EVI Feasibility Model 
6.1.2 Commercial Model Approach
Moray Council does not expect to have the money to fund/continue funding and subsidise charging
post infrastructure due to various financial pressures, therefore the most appropriate approach is a
concession commercial model which will transfer the short to medium term risk to the private sector
and with grant funding to support the upfront capital costs.
Moray Council currently owns a significant amount of public infrastructure and associated DNO
connections and it is recommended that as part of a concession approach, a portfolio of council owned
assets could be offered to help leverage private investment. Contract terms should be agreed along
this basis to encourage investment from CPOs by offering a balanced package of high demand on-
routes sites near the A95/A96 and rural less lucrative sites. 
The preferred approach is for Moray Council to retain ownership of the DNO connection but not to
take ownership of any charging post infrastructure as this helps ensure future flexibility around
upgrades to technology. Contracts will specify the CPOs own from the feeder cabinet / pillar onwards
to the charging post and cover ongoing management, operation, repair, and maintenance.
Additionally, although the DNO connection will be owned by Moray Council, maintenance of the DNO
connection will be passed to the CPO within any contracts established
Initial engagement with CPOs has indicated that there is interest in operating within Moray and that
there is the potential for a portfolio-based approach to a concession model, mixing high and low
utilisation sites. Initial discussions with CPOs have indicated a willingness to follow this approach with
Page 83

Page 84

37 
quoted examples of 10-15% of the network being suitable as low utilisation sites which are subsided
by other high demand sites. 
Moray Council’s vision for the EV charging network is that charging posts should be accessible to all
residents and visitors. As a result, should there be potential for Moray Council to receive revenue
share in the medium to long term as part of contracts with CPOs, this will be reinvested in seeking to
lower as much as feasible the differential between the tariff paid by homeowners who have access to
home charging and the tariff paid by residents using the public network such as on-street charging
posts. 
6.1.3 Expected Funding Requirements
This strategy and expansion plan has set out a plan for the best use of Moray Council owned carparks
to meet the forecast demand and help ensure an equitable transition to electric vehicles. It is expected
that grant funding of approximately £828,500 will be required to deliver this infrastructure. This will
represent a level of funding where commercial investment from CPOs have been predicted to fully
fund sites which have been identified as attractive based on utilisation levels and the criteria for
charger post type and location derived through discussion with CPO’s 
6.2 Local Authority Retained Works and Services
As noted above in Section 6.1, our preferred approach is for Moray Council to retain ownership of the
DNO connection and underground assets and for the contract to specify that the CPO own the feeder
cabinet / pillar onwards to the charging post and cover ongoing management, operation, repair, and
maintenance of assets. Therefore, details of local authority retained works and services is not
applicable in this case. 
6.3 Procurement Options
It should be noted that Moray Council are currently considering whether to join with the
Highland/Aberdeenshire/Aberdeen City Pathfinder project given our geographical location directly
between the Aberdeenshire and Highland which are already signed up to the project. Moray Council’s
inclusion in this project would be facilitated through HiTRANS in conjunction with several other Local
Authorities in the north and north-west of Scotland.
The Pathfinder project operates a concession/partnership model, which entails a joint approach to
the procurement process across Pathfinder members, but packages of lots are specific to the
individual regions. The rates are set within the overall contract, and any member call off contracts will
use these rates, but the procurement offer is individual to the specific local authority, e.g., sites are
not combined across the councils.
The benefits from being part of this larger organisation is to have more scope for dedicated staff
working specifically on EV procurement and management and to create a greater combined "prize" to
attract private investment.
If Moray Council does not join with the wider Pathfinder project, then it is expected that a framework
call off contract will be used to source commercial operators for charging post infrastructure. This
option will significantly reduce the time and resource requirements on Moray in comparison to an in-
house procurement approach if the offers available from providers through a framework are
acceptable. 
Page 84

Page 85

38 
6.4 Specification, Standards & Contract Terms
The required specification for standards within any contract with Moray Council for EV infrastructure
needs to consider the following key elements
 A standard specification of what Moray Council is looking to achieve, there are some
benefits to not being overly prescriptive due to the constantly evolving nature of the
field of electric vehicles and charging infrastructure.
 The use of the Open Charge Point Protocol (OCPP) is promoted as the best way to
enable the functionality required for widely available and accessible recharging
networks of the future.
 Compliance with all relevant legislation (e.g., Data Protection Act 2018) and standards
for processing financial information.
 Data that the CPO shall provide to Moray to assist it with managing its charging post
portfolio, notably the exact format requirements.
 Compliance with minimum business management standards at set by Moray Council
e.g., environmental management and quality management. This can be ISO standards
but does not necessarily have to be.
 Contract to ensuring the availability of local staff from private providers available to
repair charging infrastructure. 
 Cover of management, operation, repair, and maintenance of charging post
infrastructure by the operators.
 Best practise around minimum requirements for accessibility and pedestrian access for
any installed infrastructure. 
7 The Financial Case
7.1 Funding sources
This section summarises the expected funding sources for the EV infrastructure as outlined within this
strategy and expansion plan 
Private Investment Funding
As outlined in this strategy and expansion plan and the wider Moray EV Strategy, there has been some
interest shown in operating and potentially investing in Moray through initial discussion with CPOs.
However, there is currently no confirmed committed commercial investment until a full procurement
exercise is undertaken. Discussions with CPO’s have provided a steer on the types of sites and
infrastructure that is likely to be attractive for fully funded models. Given the rural nature and low
population density in Moray, combined with the current and forecast low utilisation levels of some
sites there is limited demand to make it financially attractive to commercial providers and so
assumptions around commercial investment in the SFT EVI Feasibility Model should be conservative. 
Scottish Government Grant Funding
Given the likely shortfall in commercial investment to cover some of the required infrastructure in
towns that will likely see low utilisation levels, it is expected that in order to ensure an equitable
network, there will be a need for charging infrastructure in the areas of Moray with low expected
utilisation and private companies are unlikely to fully fund this and so some government funding will
be required in the short to medium term to cover initial infrastructure and ongoing maintenance of
some sites. 
Page 85

Page 86

39 
Moray Council Funding
There is currently no funding available from council revenue to subsidise operation of infrastructure.
Capital investment is expected to be focused on EV infrastructure to service the Councils own fleet of
vehicles. 
7.2 Financial Viability of Service/Concession Type Contracts
As outlined in Section 6.1, the infrastructure identified within the site assessment and their forecast
utilisation levels have been input into the SFT EVI Feasibility Model and a range of inputs scenarios
have been undertaken to find a balanced, realistic scenario for future funding. Through this process
the optimum mix of tariff structure, operating period, and capital subsidy has been identified and is
summarised below: 
Table 16: SFT EVI Feasibility Model Inputs
Input Value Rationale
Contract Operating Period 15 years Relatively standard contract length and highlighted in soft
market testing as a preferred length by operators
AC Consumer tariff 0.32 £/kWh
AC/DC tariffs are reasonable, Base tariff represents an
increase DC Consumer tariff 0.38 £/kWh
Base Electricity cost 0.25 £/kWh  
Assumed general inflation Rate 2.5%
Although lower than 2022, this represents a long-term
forecast
Development & Advisory costs £2,000 Standard 
Useful life of existing enabling works 15 Standard 
Useful life of existing DNO works 20 Standard, longer than term of contract 
Useful life of planned enabling works 15 Standard 
Useful life of planned DNO assets 20 Standard, longer than term of contract
Projected utilisation growth rate 5% Modest growth, but incorporates growth in competing
charging posts 
Debt funding No All investment funded by assumed available capital
Capital Subsidy 0 Determined by scenario 
A level of funding where CPOs have been assumed to finance 17 of 44 of the total sites has been
applied within the inputs into the SFT EVI Feasibility Model and based on this it is expected that grant
funding in the range of approximately £828,500 will be required to deliver the full suite of planned EV
infrastructure within Moray Council owned car parks. 
8 The Management Case
8.1 Governance and Management
This section sets out the Management Case. It describes how the expansion project will be delivered
using project management best practice and demonstrates an appropriate governance structure and
assurance framework to oversee the project.
Page 86

Page 87

40 
To enable efficient assessment of the proposals and to demonstrate the Council’s management
capability for successful delivery of the schemes the following elements of project management are
in place:
 Evidence of similar projects
 Programme/project dependencies
 Governance, organisational structure, and roles
 Outline Programme/Project Plan
 Assurance and approvals plan
 Communications and stakeholder management
 Programme/project reporting
8.1.1 Evidence of Similar Projects
Since 2014 Moray Council has installed a series of Electric Vehicle charging posts throughout the
Council area, in public car parks and on the public road which have been completed successfully within
budget and on time. The charging posts are at the locations listed in the Electric Vehicle Strategy
document in Section 4 and Table 5-1. 
8.1.2 Project Dependencies
The delivery of new electric vehicle charging infrastructure has a series of dependencies which include
utilities diversions/upgrades and in some cases access to third party land. 
Utility Diversions/Upgrades
It is anticipated that some utility diversions/upgrades may be required because of the installation of
the new charging posts. Should these diversions/upgrades involve some engineering challenges, early
contractor involvement will mitigate against any potential utility or construction risks. Furthermore,
investigation by trial holes will be undertaken to establish the location of apparatus in key areas to
ensure an accurate assessment of impacts and costs can be made at this stage of the project. 
Third Party Land
Third party land may be required for the siting of charging posts within smaller communities. These
locations are likely to be car parking areas associated with community assets such as Halls. Early
discussions will take place with the communities and the boards responsible for the community assets. 
8.1.3 Governance, Organisational Structure and Roles
Moray Council would establish a clear and robust structure to provide accountability and an effective
decision-making process for the management of the Electric Vehicle Infrastructure expansion and
development of the partnerships with private operators. The following members of staff would have
dedicated roles on the project:
 (Vacant Post): Moray Council Transportation Manager – Project Delivery Manager
 Diane Anderson: Moray Council Senior Engineer Transportation – Project Manager
 Colin Matheson: Moray Council Traffic Engineer – Project Engineer
 Janis Hepburn: Moray Council Procurement Manager – Procurement Officer
 Aileen Scott: Moray Council Legal Services Manager – Legal Advisor
 Stuart Beveridge: Moray Council Estates Manager – Property and Leases
 Debra O’Shea: Moray Council Principal Finance Officer – Finance Advisor
 Rod Lovie: Moray Council Climate Change Principal Officer – Steering Group
 Representative from Scottish Futures Trust – Steering Group
Page 87

Page 88

41 
 Gemma Robinson: HiTRANS – Steering Group
The responsibility for delivery of the schemes rests with Moray Council, who will assume an overall
project management role and establish a Steering Group chaired by an officer from the Council’s
Economic and Commercial Services department. The Steering Group will meet on a regular basis to
review progress, update the risk register and make key strategic decisions.
The day-to-day management and delivery of the project will be the responsibility of the Transportation
Section. They will work closely with any appointed contractors and other delivery partners, and form
the point of contact for stakeholders.
The usual Council governance procedures will apply to all aspects of the project management, with
issues being escalated in accordance with Council protocols as necessary.  Copies of the Council’s
governance procures can be provided upon request. 
8.1.4 Project Plan
A Provisional Project Plan will be developed. It will cover each key stage of the project and the critical
path. The tasks that have a critical end date that affect the delivery timescale will be highlighted on
the Project Plan. The plan will be reviewed and updated on a regular basis and will be considered at
fortnightly Steering Group meetings.
The Project Manager will have overall responsibility for delivering the tasks required to achieve key
milestones. 
8.1.5 Assurance and Approvals Plan
Project assurance and approvals are the main responsibility of the Steering Group Chair and supported
by the Steering Group who will also ensure the quality of the work carried out. The schemes will be
managed in line with the Project Plan and the Steering Group will sign off each stage and give the ‘go’
/ ‘no go’ decision to start the following stage. 
8.1.6 Communications and Stakeholder Management
Moray Council regularly undertake Stakeholder Engagement for plans, strategies and projects and
have an established process. Effective use of the process has resulted in limited adverse feedback
from the public and ensured successful delivery of schemes both from a project management and
public relations perspective.
The main aim of the Stakeholder Engagement is to ensure that stakeholders and members of the
public are kept informed throughout the development and implementation of the schemes. This can
range from keeping key stakeholders update with critical information, essential to the successful
delivery of the schemes to providing information to the public.
A range of target audiences will be identified, including those who will benefit (directly or indirectly)
from the schemes; those affected (directly or indirectly); those who may have an interest without
being direct affected; those with a statutory role; and those involved with the funding of the schemes.
The level of information provided to each group will vary based upon the specific needs ranging from
intensive consultation, general consultation, through to information provision.
A detailed stakeholder management strategy will be developed that identifies specific stakeholders
and interest groups, categorises then in terms of impact, and establishes the required level of
engagement. 
Page 88

Page 89

42 
8.1.7 Project Reporting
Progress Reports will be produced by the Project Manager and comprise updates on:
 General progress
 Project finances
 Issues
 Risk and governance meeting dates
The report will identify areas of concerns or where decisions are required by the Steering Group. 
8.2 Risk Management and Mitigation
A risk register has been outlined below in Table 17 to highlight potential risks and associated
mitigations in the delivery of Morays EV infrastructure. 
Table 17: Risk Register
Risk Consequence RAG
Before Mitigation RAG
After
Uncertainty around exact
value of private sector
funding
Potential shortfall in required
EV infrastructure funding R
A robust assessment has been
undertaken on the likelihood of
private investment and a
conservative estimate included
A
Handing Operation of all
sites to a single supplier
Supplier not performing to
required standard A Performance metrics stipulated
within contract G
There is expected to be a
lot of infrastructure
required across UK in the
next few years
The market cannot supply all
the required infrastructure,
larger counties are prioritised
A
Joining with the HITRANS
Pathfinder project offers a bigger
prize for operators G
Longer contract lengths Suppliers do not keep pace
with future EV technology A This can be specified within
contract conditions G
Sites do not yield the
expected demand and
revenue
Sites are less attractive to the
private sector R
Conservative approach to
forecast utilisation predictions
and subsidy requirements
A
Future detailed costing of
infrastructure by SSEN
Assumptions on DNO costs are
low R
A range of costs have been
calculated and a conservative
approach taken
A
Detailed planning
indicates site not practical Site could not proceed A
The site selection process has
focused on a large range of
metrics and in most cases,
alternatives are available in the
long list of sites
G
Page 89

Page 90

43 
Detailed Design
Design process extended
because of complications e.g.,
in ground conditions or utilities
A
Installation at all locations is on
existing Moray owned property,
no 'virgin ground'
G
Procurement route not
confirmed
Potential for delays to
programme R
Consideration of both currently
possible procurement options in
timetables
A
Inflation Project costs increase
unexpectedly R Apply different contingency
scenarios to costs A 
8.3 Timetable and Next Steps
This section sets out an indicative timetable of next steps as outlined below in Table 18 to progress
the expansion of Morays EV infrastructure as outlined in this report: 
Table 18: Indicative next steps
Task From To
Strategy and Expansion Plan submitted Dec-22 
Strategy and Expansion review period Dec-22 Mar-23
Awaiting formal DNO quotes Mar-23 May-23
Confirm procurement route (HiTRANS Pathfinder) * May-23 Aug-23
Tender Process Aug-23 Sep-23
Detailed design Sep-23 Oct-23
Operational Safety Review Sep-23 Oct-23
Prepare and advertise TROs Sep-23 Dec-23
Confirm DNO connection costs Oct-23 Dec-23
Confirm site installation and costs Oct-23 Dec-23
Confirm programme Dec-23 
Install 21 sites Dec-23 Jan-24
Prepare and submit evidence to SFT Jan-24 Mar-24
* Estimate, some uncertainty around procurement route timescales 
The Council will utilise future enabling grants from Scottish Government to review the need and
options for on-street charging infrastructure, along with the potential use of any other emerging
charging technologies.
Page 90

Page 91

44 
Annex 1 – Strategy and Expansion Plan Assessment and Review 
The joint TS/ SFT Programme Team will review Strategies set out in Part 1 against the following
headings:
 Contributes to a comprehensive consumer focussed network
 Promotes an accessible and reliable network that works for all
 Supports the principle of a Just Transition
 Supports communities without home charging and rural areas
 Supports active and public transport choices 
The joint TS/ SFT Programme Team will review Expansion Plans set out in Part 2 against the following
headings:
 The scope of works to be publicly procured complements the expansion of the public
network by the private sector
 The capital and operational cost estimates and income forecasts are realistic
 The capital funding being sought from Transport Scotland enables
 private finance to be crowded in; and
 charging post provision in areas which would not be commercially viable on their own
 The likely commercial viability of the proposed delivery model 
 The robustness of the proposed approach to procurement
 The approach to delivery is coordinated with DNOs to minimise the necessity for grid
upgrades.
 There is co-ordination and/or collaboration with other local authorities or public
bodies 
These are not pass/fail criteria. It is recognised that approaches across Scotland will vary, and that
private provision of the public network will play a key role in overall expansion of the public charging
post network.   
The assessment of submitted Strategies and Expansion Plans will be presented to the Programme
Board.  The Programme Board comprises representation from TS, COSLA, EST, SFT and the SCOTS
network.  The Programme Board will make recommendations to TS as to capital funding to be allocate
of the four-year period. 
Page 91

Page 92

Page 92

Page 93

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 7 FEBRUARY 2023 
SUBJECT: UPDATE ON ZERO EMISSION FLEET REPLACEMENT
STRATEGY 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To provide Members with an update on the approach and progress to date in
decarbonising the Council’s fleet. 
1.2 This report is submitted to the Economic Development and Infrastructure
Services Committee in terms of Section III (F) 15 of the Council's Scheme of
Administration relating to the function of the Council as Roads Authority. 
2. RECOMMENDATION 
2.1 It is recommended that Committee: 
(i) notes the progress being made by Fleet Services to contribute to
the Council meeting its ambitious net zero targets; 
(ii) notes the challenges faced within the transport sector as outlined
in this report means it is highly unlikely that Moray Council will be
able to remove all of its fleet carbon emissions by 2030; 
(iii) agrees to align Moray Council targets for fleet decarbonisation
with the Scottish Government targets to phase out light
commercial vehicles by 2030 and heavy duty vehicles by 2040
which will allow Moray Council to replace vehicles with low
energy alternatives as soon as is practically feasible; 
(iv) notes that adopting this approach may save money by delaying
purchase of certain vehicles until the market has stabilised, but
will still require capital investment which will be subject to
consideration as part of the standard financial planning process
going forward; and 
(v) notes that implications on any delay in reducing Moray Council
carbon emissions from fleet vehicles will be worked into the
update of the Moray Council’s Route Map to Net Zero (RMNZ)
which is being reported to this Committee in May 2023.
Item 8
Page 93

Page 94

3. DEFINITIONS 
3.1 BEV – Battery electric vehicle
FCEV – Hydrogen fuel cell vehicle
ZEV – Zero emissions vehicle
HDV – Heavy duty vehicles
ICE – Internal combustion engine vehicle (powered by diesel or petrol)
LCV – Light commercial vehicle (gross vehicle weight of up to 3.5 Tonne)
RCV – Refuse collector vehicle 
4. BACKGROUND 
4.1 The Scottish Government (SG) have set a target to replace all public body
operated fossil fuel passenger cars by 2025 with a further target for these
bodies not to purchase fossil fuel light commercial vehicles under 3.5T after
2025 and have these vehicle types phased out in Scotland by 2030. The SG
target for phasing out Heavy Duty Vehicles (HDV) is by 2040. 
4.2 On 10 March 2021 (para 13 of minute refers), the Council adopted a Climate
Change Strategy for 2020-2030.  The strategy set a goal of the Council being
carbon neutral by 2030 and that the Council, its officers and members will
work with others across Moray to deliver that goal. To be net-zero means that
the Council will reduce its carbon emissions as much as possible and offset
any remaining emissions. 
4.3 On 6 April 2022 (para 18 of the Minute refers) the Council adopted a route
map to start the process of calculating how the Council would reach net zero
emissions by 2030. This route map recognised the difficulty in converting
Council fleet vehicles and estimated that 75% of fleet vehicles would be
transferred to ultra-low emissions vehicles by 2030. The residual emissions
would have to be offset until the remaining fossil fuel vehicles were phased
out. 
5. CURRENT POSITION/ACTIVITY TO DATE  
5.1 Moray Council’s Fleet Strategy is very much focussed on supporting front line
Services as the council transitions from petrol/diesel vehicles and plant
machinery to a zero-emission fleet (ZEV). The fleet plays a vitally important
role in providing frontline services to the residents of Moray and this must be
done in a cost effective, efficient, and environmentally friendly way. 
5.2 The clear commitment to net zero targets was initiated by Fleet Services in
2010 with the purchase of the Council’s first fully electric vehicle, the car is still
operational as a test bed to determine ultimate battery life. This vehicle
transition programme has continued to gather momentum since that time. 
5.3 At present, the council’s existing fleet contains a total of 44 electric vehicles,
which have been well received by Council staff and the wider community. This
early and committed ambition to vehicle transition has put the Council in a
Page 94

Page 95

strong position to ensure continued compliance with government targets on a
net zero approach. It is planned to continue with the current 10 year capital
replacement programme to enable the Council to remain on target, identify
challenges and ensuring the adoption of zero-emission fleet vehicles meet
current national policy commitments. 
5.4 The council’s approach to vehicle safety and compliance is and will continue
to be a top priority. Many vehicles operate under the Driver and Vehicle
Licencing Agency Goods Vehicle Transport’s Operator licencing conditions
and with that comes significant responsibility to ensure 100% compliance. 
5.5 The Fleet Service team continues to work with all relevant service areas
across the Council to identify their vehicle needs requirements moving
forwards. Table 1 below outlines the current makeup of low or zero emission
vehicles currently in operation. 
Table 1 – Current low emission Fleet in operation 
Vehicle type Number of
vehicles
EV Car 13
EV small van 2
EV medium size van 27
Mini - bus 1
34no seater bus 1
Total 44  
5.6 Over the last 12 years the Council has taken advantage of Government grant
funding to support its EV charging infrastructure investment. To date £203k
for infrastructure has been funded by the Energy Savings Trust (EST), which
has led to the installation of 31 charging points and a further 21 single head
charging points currently in the tender process stage. These are on the whole
owned and operated by the Council for its own vehicle fleet. Most of these
units are double headed which ensures it is possible for up to 61 vehicles to
be charged at any time across the whole Council area. 
6. WHY ZEV BY 2030 WILL BE A CHALLENGE 
6.1 Migration to a zero-emission fleet is going to be a complex process which will
take a number of years. Whilst good progress has been made it is evident that
issues such as supply chain pressures and price inflation are extending the
lead times for vehicles and infrastructure. Many manufacturers are still at the
prototype stage and this makes whole life costing, including estimating
residual value of vehicles, difficult to predict. 
6.2 High upfront cost of purchasing ZEVs and the additional cost of project
management for installing charging infrastructure and ongoing management
of the infrastructure is proving difficult. The lack of certainty of future capital
funding required to fund the migration is also of concern. At the present time
whilst officers can report the cost of EV cars has significantly reduced over the
last few years, the cost for large vehicles is still in the region of 2 and 3 times
more expensive than the current comparative vehicle on existing fleet, such
as buses, refuse lorries, gritting vehicles etc. There are also widely reported
Page 95

Page 96

concerns from the vehicle industry that many vehicle suppliers have not
begun to consider ZEV alternatives for specialist and bespoke vehicles. 
6.3 Consideration will be made to migrate the council’s larger HDVs to hydrogen
but again this is not straightforward. Until hydrogen vehicles are available in
more commercial quantities the cost will remain high, likewise the production
and distribution of hydrogen is of equal concern. Industry experts predict that
it will be after 2025, and closer to 2030, before manufacturers are producing
vehicles in any reasonable quantity. 
6.4 The introduction and maintenance of charging units or hydrogen refuelling
stations to support ZEVs would create a substantial additional budget
pressure.  At present, hydrogen is not commercially available in Moray
although there are on-going discussions with an external partner who is
looking at options to produce, transfer and supply hydrogen in the future. 
6.5 The council’s Fleet Manager is continuing to report real concern with the lead
times of electric vehicles being provided once orders have been committed. In
some instances vehicles have taken in excess of 24 months to arrive. One
recent order for a large electric bus was cancelled by the vehicle supplier 12
months after the initial award, due to internal build issues of the vehicle. This
is now being reported as being more commonplace across the industry with
many other local authorities reporting similar supply issues. The well
published global shortage in semi-conductors and the on-going impact of the
pandemic continues to be an obstacle in the long lead times for ZEVs being
quoted. 
6.6 Many depots and buildings are likely to have reached their electrical capacity.
Recent infrastructure works at Ashgrove depot have now taken up the
available electrical capacity and it is now the case that substations and grid
upgrades will be needed to facilitate any future additional charging points. 
6.7 The lead time for the installation of appropriate charging infrastructure is a
major factor and a certain level of contingency needs to be allowed for.
Applications for electricity grid connections have quadrupled in the last 4
years and requesting estimates for proposed upgrades/new infrastructure
from the council’s electrical District Network Operator (DNO) is proving difficult
due to the challenges and demand they are facing on their network. 
6.8 The service continues to develop its 10 year rolling fleet replacement plan and
will need to secure additional capital funding if it is to transition all of the fleet
to ZEV. Work is ongoing with Finance colleagues to identify the potential
scale and timings of investments that will be required to ensure the council
can manage the transition. 
6.9 The current annual Vehicle and Plant replacement capital budget is £3.53m.
As identified in 5.2 above, replacement ZEV’s are currently 2 to 3 times the
cost of fossil fuel vehicles and plant, dependant on type and hydrogen is in
the region of 4 times that of fossil fuel both plus infrastructure. It is therefore
estimated that as ZEV’s and hydrogen become readily available from major
manufacturers that the capital annual replacement budget will need to
increase incrementally, as the market develops and vehicles become
available. Initial projections set out phased capital increases from 24/25 rising
Page 96

Page 97

to approx. £9m by 2030/31 to cater for the larger/specialist vehicle
replacement. Initial estimates suggest this could be a total increase of up to
£32m over the period. 
6.10 Due to rapidly advancing technology and an unstable global vehicle and plant
market, the phasing of capital required to meet Moray Council and Scottish
Government targets will be reviewed on an annual basis.  
7. PROPOSED APPROACH/ENABLERS 
7.1 Small cars & vans 
It is proposed to continue to purchase suitable ZEV cars and small vans when
they are due for replacement due to the success of early transition and the
need to meet the Council and Government net zero targets. The aim is to not
purchase ICE vehicles after 2025 where a commercially viable option exists
and is deliverable in line with our fleet replacement programme to ensure
climate change targets are met. 
7.2 Medium, large and specialist vehicles 
For the next 2 years (2023/2025), to allow for the ZEV vehicle market to
further develop and mature, it is proposed to continue replacing the larger
type and specialist vehicles with diesel (low emission Euro 6 and Euro 7
where available) but on the proviso at next replacement cycle they are
replaced with comparable ZEV that is available at that time. 
7.3 It is also recommended that where a ZEV specialist or large vehicle is
available that these are trialled between 2025 and 2027 and purchased at
small scale to robustly test suitability for service users and ensure value for
money to the Council is achieved in its transition from petrol/diesel vehicles to
ZEVs. 
7.4 Charging Infrastructure 
The Council has an on-going depot and buildings review which will influence
the future charging infrastructure strategy that will be required to transition all
of the Council’s fleet. Longer term plans for depots/buildings are currently in
development which will facilitate the required planning of infrastructure with
the council’s District Network Operator. 
7.5 In the meantime, charging infrastructure will continue to be installed at the
most suitable locations throughout Moray. 
7.6 The Council has been undertaking various workstreams across the broad
area of electric mobility, one of which has been for the Council to engage with
an external consultant to deliver a public infrastructure and electric vehicle
fleet replacement study. Jacobs consultants have been commissioned to
assist and offer a sense check approach to the work being progressed by the
Fleet team and offer advice on the optimum timing and sequence of the
Council’s continued move to a zero emissions fleet of its own vehicles.
However, this work by Jacobs is still in development and a further update will
be reported through committee at a later date.
Page 97

Page 98

7.7 Alternative Fuels 
A separate piece of work has been completed to develop a hydrogen strategy
for the Council, which has now been approved and sets out the Council’s
vision to support the emerging hydrogen economy within the region whilst
clarifying the role the Council will play in supporting this energy transition. 
7.8 Officers within the Fleet team have participated in a number of working groups
and have developed good relationships with other local authorities who are
currently progressing with ZEV alternative vehicle trials. 
7.9 Training 
Across the sector industry there is currently a lack of EV training available and
other authorities including Moray need to develop training plans to ensure
staff and external suppliers have the right skills and working environment to
maintain the zero-emission fleet. Training is an important area to consider
both from a generic and technical perspective. Local authority staff who are
driving electric vehicles also need to understand how to use chargers, when
to charge vehicles and to what capacity. 
8. ENERGY SAVINGS TRUST RECOMMENDATIONS 
8.1 For 2020/21 the Switched on Fleets funding was administered by the Energy
Savings Trust (EST) who introduced a programme to provide fleet
decarbonisation support. This support programme is designed to help local
authorities achieve their fleet decarbonisation commitments. Key data on the
existing fleet and how the council use it was collated and a decarbonisation
report produced.  This report has been uploaded to the Committee
Information Management System (CMIS) as an additional meeting document
for information. 
8.2 The Council approach to replacing cars has been recognised within the EST
fleet decarbonisation report who recognise that “all of your cars are due to be
replaced before 2025, so you are on track to meet the government’s target
provided these vehicles are replaced on schedule with ZEVs.” 
8.3 In addition, the council’s commitment to its fleet replacement strategy has
been recognised by EST who note that the council have a varied fleet, with
some expensive specialist and purpose-built vehicles that have long
replacement cycles to maximise the return on their investment. Vehicle
replacement cycles currently range from 3 years on average for cars, to 7
years for the light fleet, and 10 years for the heavy fleet. 
8.4 The EST fleet decarbonisation report has included a summary of its
recommendations in an attempt to help influence the Council in its efforts to
decarbonise its fleet. Table 2 below highlights the summary of the
recommendations made and the progress already made by the Council. 
Table 2 – Summary of EST fleet decarbonisation recommendations
Page 98

Page 99

Description of
recommendation
Progress to date Timescale
Install driver behaviour telematics
in all vehicles
75% completed Aim to be
100% by
End March
2024
Implement a robust travel
hierarchy that will reduce
unnecessary journeys and
encourage active travel
Report approved by E,D & I S
committee  15th November
2022.
Complete
Replace all Internal combustion
engine (ICE) cars with ZEV
alternatives at the next
replacement cycle
On-going but subject to vehicle
availability and appropriate
infrastructure.
2030
Replace all ICE LCV’s with ZEV
alternatives at the next
replacement cycle
On-going but subject to vehicle
availability and appropriate
infrastructure. The technology
very much in its infancy.
2030
Downsize fleet vehicles where
possible
Council to commission an
operational review by all
departments of their vehicle and
plant requirements.   
Develop the financial plan for
replacing all vehicles with ZEVs
On -going 
9. Carbon Reduction Implications 
9.1 The proposed approach in section 6 will have the implication of adopting a
slightly slower rate of reduction in carbon emissions of the Council fleet of
vehicles. If it was possible to replace every vehicle with a ZEV option at the
end of its life then the estimated carbon reductions are shown by (blue line) in
Chart 1. However, the more pragmatic approach being proposed (orange line)
will have the effect of altering this reduction as shown below. This will not
meet with Moray Council 2030 net zero target but will meet revised targets
aligned to SG targets. While neither approach for our vehicle fleet will reach
zero emissions by 2030, the revised approach will contribute to reducing
carbon emissions considerably by 2030 and this will be considered in the
route map review to be undertaken later in the year. 
Page 99

Page 100

9.2 The proposed approach is therefore estimated to lead to an increase in the
Council’s anticipated carbon emissions of 11,997 tCO2e. This includes an
estimated excess of 2,554 tCO2e beyond the Council’s 2030 net zero target
date. 
9.3 Most of the difference is around the delay in replacing specialist or large
vehicles. By their nature these are large emitters of carbon compared to other
fleet vehicles, and the time required to wait for suitable replacements leads to
prolonged use of fossil based alternatives. It should be noted that the
expectations in carbon reductions for cars and LGVs is still challenging to
reach the targets within the replacement cycle. 
9.4 The estimated carbon emissions of each vehicle type are highlighted in Chart
2 below. It should be noted that this is based on projected infrastructure
upgrade timing and predicted vehicle availability. However, it must be
highlighted that these factors are out of the council’s direct control as
identified in section 5 above. 
9.5 The calculations are based on replacement cycles of vehicles and do not take
into account difficulties in depot changes or any downsize of fleet vehicles.
The high upfront financial cost of purchasing ZEVs and of possible depot Page 100

Page 101

improvements means it is essential that business case calculations should
take into account the social cost of carbon emissions as well as financial costs
to allow a more whole life approach to investment to influence funding
decisions. 
10. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The work done to date and proposed plan to continue to develop the
council’s ZEV strategy and to transition our fleet aligned at a pace to SG
targets sits within the approach of the council in its Corporate Plan to
facilitate Moray being recognised as an outward facing and ambitious
Council delivering a sustainable economy. 
(b) Policy and Legal
Legal - Failing to achieve the Scottish Government’s target is more of a
reputational risk than a legal risk. 
(c) Financial implications
The financial cost of decarbonising the LGV fleet is significant. The cost
of LGVs powered by electric and hydrogen remain prohibitively high.
Generally EV costs are double and hydrogen costs are treble the cost of
diesel vehicles. There are financial implications associated with the
future decarbonisation of the fleet and building of required infrastructure. 
Initial indicative projections set out phased incremental capital increases
of £2m each year through to 2030 to facilitate vehicle transition to ZEV.
This high level approach is based on smaller vehicles are much cheaper
to replace and do not drastically increase the capital costs but as we
progress to replace the larger vehicles costs will increase. High level
projections suggest combining all vehicles and total volumes of
replacements over the next 10 years is projected to cost in the region of
£32m.   
More detailed work is underway to accurately forecast what total
investment will be based on current prices and this will be reported at
future committee. It must be pointed out that there will likely be costs
savings in running an EV fleet as a result of the difference between cost
of electricity and cost of diesel. Another cost assumption is the EV sector
suggests a reduction in maintenance costs but this is not proven at this
time and difficult to quantify. 
It is also assumed that the current ZEV replacement costs that are
double and treble of current diesel vehicles will become less as the
external market develops.  We shall require to utilise our own capital and
revenue budgets alongside grants and bids to Scottish funding streams.
There will be pressure on the market to supply ZEVs which will impact
on pricing and availability as organisations move to replace their fleet to
meet internal and national targets. 
Page 101

Page 102

As reported there will be financial implications with regards to the
associated infrastructure required whether this be electrical
underground, electrical battery, solar, wind or hydrogen. It is crucial that
the on-going depot and buildings review is completed which will
influence the most suitable and appropriate charging infrastructure
required at key locations to transition all of the Councils fleet. 
(d) Risk Implications
Budget Pressures – Officers will seek to maximise the funding available
from Scottish Government to assist with the transition to zero emission
vehicles and build the required infrastructure. 
ZEV availability – MC will not receive vehicles in time to reach SG
targets. 
Workforce – Investment in our Depots and Training will be provided to
ensure our teams and the right skills and working environment to
maintain a zero-emission fleet. 
Road to Net Zero Challenges – The actions from this report will support
the reduction of CO2. 
Infrastructure – It is challenging to receive advice, estimates on cost and
installation timescales from our DNO operator within reasonable
timescales and this is widely the same across all regions, simply due to
the demand and capacity issues across the network. 
(e) Staffing Implications
To meet the council’s net zero aspirations is challenging within current
workforce. The market is rapidly changing and appropriate resourcing,
including project management support is crucial to manage infrastructure
installations, power sources and planning/building warrant issues. 
The change required to transition all the fleet will require on going
management and administration of the back office infrastructure function
such as control of charging cards/Invoicing/repairs to infrastructure
responding to out of hours emergencies. 
Training will be required at all levels throughout the organisation. 
Recruitment and retention of fleet staff remains an issue. 
(f) Property
The depot review is critical to allow for better understanding of what
depots and building assets are to remain in the Council’s long term plans
moving forwards. This will provide the strategic direction to assist with
planning of the infrastructure, carrying out reviews to identify capacity
issues at depots/buildings which will then require planning and building
warrant control. 
(g) Equalities/Socio Economic Impact
The transition to a more environmentally friendly fleet will result in
improved air quality for our local communities.
Page 102

Page 103

(h) Climate Change and Biodiversity Impacts
There is a reputational risk of not meeting the Scottish Government and
Moray Council objectives in relation to its climate change agenda and
ambitious net zero targets. 
The approach proposed in this report is estimated to lead to an increase
in the Council’s anticipated carbon emissions of 11,997 tCO2e. This
includes an estimated excess of 2,554 tCO2e beyond the Council’s 2030
net zero target date. 
The operation of fossil fuel powered vehicles contributes to local air
pollution and the approach proposed in this report will prolong release of
air pollutants and resultant exposure to employees and the wider public.
However, it is noted that the proposed replacement vehicles will emit
lower levels of air pollution than the current models in operation. 
Page 103

Page 104

(i) Consultations
The Depute Chief Executive (Economy, Environment and Finance),
Head of Environmental and Commercial Services, Legal Services
Manager, Chief Financial Officer, Committee Services Officer (L Rowan),
and Equalities Officer have all been consulted and their comments
incorporated into this report. 
11. CONCLUSION 
11.1 The SG target for phasing out HDV vehicles is by 2040. However, the
ambitious Council target is to replace or offset all these emissions by
2030 which will require the large vehicles to be replaced by 2030. As a
result of the factors identified above, which includes cost, suitable fleet
availability and the required charging infrastructure this is felt to no
longer be reasonably achievable for this asset type. 
11.2 Subject to approval it is proposed to continue to develop the council’s
ZEV strategy and transition the fleet aligned at a pace to SG targets
where between now and 2040 the market is expected to mature
significantly with greater choice and reduced costs. 
11.3 This approach will inform forward capital funding requests as part of the
capital planning process. 
11.4 Work will continue to more closely align the separate strategies being
developed by the Council under its climate change agenda. Currently
separate teams are responsible for the development of hydrogen
strategies, EV public infrastructure, Fleet decarbonisation and council
owned infrastructure. 
Author of Report: Mark Atherton, Roads Maintenance Manager 
Background Papers: 
Ref:    SPMAN-524642768-841
Page 104

Page 105

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 7 FEBRUARY 2023 
SUBJECT: CLODDACH BRIDGE STRUCTURAL ASSESSMENT 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the structural condition of Cloddach Bridge which
is currently closed in the interest of public safety and advise on the options
available for the future operation of this bridge. 
1.2 To inform the Committee of the meeting held with community representatives. 
1.3 This report is submitted to Committee in terms of Section III (F) (15) of the
Council's Scheme of Administration relating to management and
implementation of the requirements of the Roads (Scotland) Act 1984. 
2. RECOMMENDATION 
2.1 It is recommended that Committee agree to either: 
(i) keep Cloddach Bridge closed to vehicular traffic but open to
pedestrians and cyclists with regular inspections to monitor the
condition of the bridge; and 
(ii) when bridge condition deteriorates further and it is not safe for any
user, this route is closed permanently and the bridge is removed; 
Or 
(iii)investigate potential options to keep the bridge open to vehicular
traffic up to 3 Tonnes in weight, at a cost of £30,370 for the
investigation with a report back on the findings of this investigation,
including estimated costs of options, to a future meeting of this
committee, referring the proposed estimated expenditure on
investigation to Corporate Committee for approval. 
3. BACKGROUND
Item 9
Page 105

Page 106

3.1 Cloddach Bridge was built in 1905 with and estimated design-life of between
100 and 120 years, after which it would require significant refurbishment or
replacement.  This bridge is located on the C2E road and a traffic survey
undertaken in 2020 showed the average number of vehicles crossing the
bridge each day was less than 800. 
3.2 Principal Inspections were undertaken on the bridge in 1995, 1997 and 2019. 
In 2001 a weight restriction of 7.5Tonnes was applied to the bridge and
following the Principal Inspection and Structural Assessment undertaken in
2019, the allowable weight was reduced to 3Tonnes. 
3.3 To deter non-compliant vehicles from crossing the bridge a 2m height
restriction was installed in summer 2021.  However, the height restriction was
hit repeatedly by non-compliant vehicles over a period of several months. 
3.4 A Special Inspection and Load Capacity Review was undertaken in February
2022, to establish how much the bridge had deteriorated and the impact the
deterioration had on the load bearing capacity.  The findings of this
assessment indicate significant deterioration and a load bearing capacity of
less than 3Tonnes.  Based on this assessment Cloddach Bridge was
temporarily closed to motor vehicles in the interest of public safety.  The
maximum length of diversion required because of this closure is 6 miles. 
3.5 To verify the condition of Cloddach Bridge an independent Structural Engineer
was commissioned to undertake a Principal Inspection and Structural
Assessment.  The independent Structural Assessment used more complex
analysis techniques that provide greater detail on the structural condition of
the bridge.  The Inspection took place in mid-February 2022, with the
Structural Analysis completed by the end of March.  The report of the Principal
Inspection and Structural Assessment has been uploaded as an additional
document to the Committee Management Information System (CMIS) along
with the agenda.  A summary of the findings is provided below. 
3.6 Findings of the independent Principal Inspection and Structural Assessment: 
• The Principal Inspection (PI) –confirmed that substantial corrosion has
occurred to the steel beams.  The concrete arches between the beams
and the steel soffit are showing significant signs of deterioration. 
These defects are commensurate with the age of the bridge, which is at
the end of its service life. 
• Structural Assessment – The Structural Assessment confirms that the
bridge does not have sufficient capacity for vehicle loading. Details of
the analysis are provided in the Assessment Report. 
• Recommendations – The Assessment report recommends that
Cloddach Bridge should remain closed to all vehicular traffic.  With
continued monitoring, the bridge could remain open to pedestrians and
cyclists for a period of approximately two years. 
3.7 Potential options for the future operation of Cloddach Bridge have been
identified and these are provided below.  A cost estimate has been provided
Page 106

Page 107

for each option by the independent Structural Engineer and this estimate
includes a nominal allowance of approximately 15% for risk.  Given that
construction inflation is currently 30% and there are a number of uncertainties
associated with the repair and replacement works, 15% is considered
optimistic.  At this stage in a construction project it is standard practice to add
optimism bias of 60%.  As a small risk allowance has already been included,
optimism bias of 45% has been added to the options requiring construction
works. 
3.8 Do Nothing – This would allow the bridge to remain open to pedestrians and
cyclists only without further intervention from the Council.  Vehicles would be
prevented from crossing the bridge by the barriers currently in place on either
side of the bridge.  This option is considered a risk to public safety as no
inspections would be undertaken to monitor its condition and suitability for
pedestrian and cycle use. There would also be no turning facilities for motor
vehicles.  There are no costs or economic benefit associated with the Do
Nothing option. 
3.9 Do Minimum – The bridge would remain open to pedestrians and cyclists
only but the structure would be inspected and its condition monitored.  Further
deterioration of the bridge is likely to result in a full closure.  A long term road
closure would be required, with ancillary works such as signage and turning
facilities for motor vehicles.  Erection of bollards or other substantial structure
would be required to prevent vehicle access while allowing access for
pedestrians and cyclists.  The cost estimate for this option is £135,000. It
should be noted that there will be additional costs required to implement a full
road closure when this becomes necessary.  There is no economic benefit
associated with this option. 
Costs
Bollards &
Signage
Stopping
Up Order
Turning
Head
Construction
Works
Optimism
Bias
Total
£50,000 N/A £85,000 N/A N/A £135,000 
3.10 Close and Demolish Bridge – the bridge would be closed to all users and a
Stopping Up Order would be progressed.  Stopping Up requires the river
channel to be reinstated to its condition before the bridge was constructed and
the land returned to the landowner(s).  The bridge, including abutments and
piers would need to be removed and the channel made good.  The cost of
demolition is estimated to be £333,500. This estimate does not include any
work that may be required to remove the weir, which forms part of the bridge
structure.  Any work to the weir would need to be done under licence from
SEPA.  There is no economic benefit associated with this option. 
Costs
Bollards &
Signage
Stopping
Up Order
Turning
Head
Construction
Works
Optimism
Bias
Total
£15,000 £10,000 £85,000 £120,000 £103,500 £333,500 
3.11 Repair the bridge for pedestrian and cycle use – The bridge would remain
closed to vehicles but strengthening the deck could extend the life of the
bridge for pedestrian and cycle use by 10 years.  There is a risk that the grit
Page 107

Page 108

blasting required to repaint the steelwork would reveal further deterioration
that could not be observed during the Principal Inspection.  If this were to
occur it could significantly increase the cost of this option.   The estimated
cost of this option is £435,000. There is no economic benefit associated with
this option. 
Costs
Bollards &
Signage
Stopping
Up Order
Turning
Head
Construction
Works
Optimism
Bias
Total
£15,000 N/A £85,000 £200,000 £135,000 £435,000 
3.12 Repair the bridge for vehicular use – This option would require complete
refurbishment of the bridge deck and parapet.  There would also need to be
extensive river bank repairs and repairs to the concrete substructure.  It is
estimated that this option could increase the service life by 50 years.  Given
the uncertainty with the condition of elements of the bridge that could not be
accessed for inspection, the risk associated with this option is considered
significant. The estimated cost of this option is £2,537,500. The economic
benefit of this option is £74,000 per year. 
Costs
Bollards &
Signage
Stopping
Up Order
Turning
Head
Construction
Works
Optimism
Bias
Total
N/A N/A N/A £1,750,000 £787,500 £2,537,500 
3.13 Demolish and replace Cloddach Bridge – This would require demolition of
the existing bridge and construction of a new single span bridge, which would
have a design life of 120 years.  The estimated cost of this option is
£2,900,000.  The economic benefit of this option is £74,000 per year. 
Costs
Bollards &
Signage
Stopping
Up Order
Turning
Head
Construction
Works
Optimism
Bias
Total
N/A N/A N/A £2,000,000 £900,000 £2,900,000 
3.14 Cloddach Bridge is not currently in the Capital Plan for expenditure on repair
or replacement.  Replacement of this bridge is considered low priority as it is
not a critical route and the maximum diversion is 6 miles.  To be classed as a
critical route the bridge would need to carry more than 7,000 vehicles per day,
provide sole access to more than 8 properties or provide access to critical
infrastructure, such as a fire station or hospital.  As this is considered low
priority it is recommended that the Do Minimum Option is progressed. 
3.15 A petition was submitted to Moray Council on 21 June 2022, asking for the
repair or replacement of Cloddach Bridge so that it can be re-opened to
vehicular traffic. The petition has 769 signatures, of which 456 are residents in
Moray. A total of 25 comments were made by the petitioners, most of which
refer to the inconvenience of an increase in travel time caused by the closure
of Cloddach Bridge. The diversion route is through Elgin and adds a distance
of 3 miles from either side of the bridge, resulting in a maximum diversion of 6
miles. The additional journey time was assessed during different traffic
conditions once at 08.15 hrs and again at 14:00 hrs and was found to be
between 15 and 12 minutes respectively. Under Section 6 of the Council’s
Page 108

Page 109

Petitions Policy, the petition should contain the names and full addresses of
50 signatories resident in Moray and who are registered on the elector
register. These names and addresses need to be verified. As the petition was
an on-line petition, it only showed names and postcodes and no signatures
and therefore did not strictly meet the requirements of the Council’s petitions
policy, when this report was first drafted for members consideration. A copy of
the petition statement is provided in Appendix A. 
4. COMMUNITY ENGAGEMENT 
4.1 Since the closure of Cloddach Bridge in February 2021, officers have
responded fully to all requests for information from members of the community
and community representatives. 
4.2 At a meeting of this Committee on 6 September 2022, it was agreed that
officers should meet with community representatives to discuss the issues
related to the closure of Cloddach Bridge (paragraph 6 of the minute refers). 
4.3 A meeting was held at Elgin Town Hall on 27 October 2022, with community
representatives from Heldon Community Council and Cloddach Bridge Action
Group, elected members and officers.  At this meeting it was agreed that a
scope to investigate options to keep the bridge open on a temporary basis
would be drafted and priced for the consideration of members.  A copy of the
agreed scope is provided in Appendix B. 
4.4 The scope for investigating options to keep the bridge open on a temporary
basis has been drafted and agreed with community representatives.  The cost
of undertaking this investigation work is £30,370.  The cost of implementing
the options assessed will not be known until the investigation is complete. 
However, it should be noted it is unlikely that any of the temporary options
assessed will cost less than £150,000. 
4.5 If members choose to progress the investigation of these options, it will be
commissioned as early as possible and the findings, including estimated
costs, brought to a future meeting of this committee for members
consideration. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
“Building a better future for our children and young people in Moray” 
(b) Policy and Legal
Moray Council in its role as Local Road Authority has a statutory duty
under the Roads (Scotland) Act 1984 to manage and maintain the road
network. 
(c) Financial implications
The financial implications are set out in paragraphs 3.9, 3.10, 3.11, 3.12,
3.13 and 3.14 of this report.  As there is no allowance for investigation
works on Cloddach Bridge in the Capital Plan, the proposed estimated
expenditure would be referred to Corporate Committee for approval.
Page 109

Page 110

When the Council approved the budget for 2022/23 on 22 February 2022
(paragraph 3 of the Minute refers) it balanced only by using reserves and
one-off financial flexibilities. The indicative 3 year budget showed a likely
requirement to continue to make savings in the order of £20 million in the
next two years. All financial decisions must be made in this context and
only essential additional expenditure should be agreed in the course of
the year. In making this determination the committee should consider
whether the financial risk to the Council of incurring additional
expenditure outweighs the risk to the Council of not incurring that
expenditure, as set out in the risk section below and whether a decision
on funding could reasonably be deferred until the budget for future years
is approved. 
(d) Risk Implications
Cloddach Bridge does not have the capacity to withstand vehicle loading
and there would be a risk to public safety if the bridge were to be
reopened to vehicular traffic without significant repair or replacement. 
There are a number of unknowns associated with demolition, repair and
replacement of the bridge and there is a risk that the cost of undertaking
these works will increase. It should also be noted that post COVID
construction inflation is currently around 30%. There is still uncertainty
around how much this may increase in future and there is a risk that
costs could increase significantly over the next few years. 
In addition, prioritising a bridge in departure from policy creates the risk
that other communities will seek to alter the prioritisation of bridges in
their area, which would exacerbate cost pressures as set out in
paragraph (c) above. Foths Bridge was viewed as an exceptional
departure from policy in 2021/22 because a spend to save case could be
made given the need for changes to school transport arrangements,
which created additional costs. There are no such considerations for
Cloddach Bridge. 
(e) Staffing Implications
There are no staffing implications associated with the recommendations
in this report. If another option is to be progressed, staff costs would be
added to the overall project costs. 
(f) Property
Cloddach Bridge currently vests with Moray Council in its role as Road
Authority. If the bridge is closed and the road is Stopped Up, the land on
which is has been constructed will need to be reinstated and returned to
the landowner. 
(g) Equalities/Socio Economic Impact
If the bridge remains closed to vehicular traffic, a maximum diversion of
6 miles may affect some car users. 
(h) Climate Change and Biodiversity Impacts
Where possible we would seek to recycle and / or reuse the waste
material generated through demolition of the existing bridge.
Page 110

Page 111

(i) Consultations
Depute Chief Executive (Economy Environment and Finance), Head of
Environmental and Commercial Services, Chief Financial Officer, Legal
Services Manager, Equal Opportunities Officer and L Rowan, Committee
Services Officer have been consulted and their comments incorporated
into the report. 
6. CONCLUSION 
6.1 Cloddach Bridge is currently closed to vehicular traffic, in the interest of
public safety. 
6.2 The bridge can be used by pedestrians and cyclists, if regular
inspections are undertaken to monitor its condition. 
6.3 The bridge cannot be reopened to vehicular traffic without significant
repair work or replacement. This bridge is not considered strategically
important for the reasons set out in paragraph 3.14 and has not been
prioritised for capital expenditure on repair or replacement. 
6.4 At a meeting with community representatives, it was agreed that an
investigation into options to keep the bridge open on a temporary basis
would be priced for Members consideration. 
Author of Report:  Debbie Halliday Consultancy Manager 
Background Papers: 
Ref: SPMAN-524642768-839 
Page 111

Page 112

Page 112

Page 113

Item 9
Page 113

Page 114

Page 114

Page 115

Cloddach Bridge
Temporary Solutions
Scope 
Version Detail Prepared By &
Date
Checked By &
Date
Authorised For Issue
By & Date
1.0  Will Burnish Debbie Halliday Debbie Halliday     
Item 9
Page 115

Page 116

Contents 
1 Purpose of the Service .................................................................................. 3
2 Description of the Service ............................................................................. 3
3 Existing information ..................................................................................... 4
4 Specifications and Standards......................................................................... 5
5 Constraints on how the Consultant is to provide the Service .......................... 6
6 Requirements for the programme ................................................................. 6
7 Information and other things provided by the Client ...................................... 6 
Page 116

Page 117

Cloddach Bridge Temporary Solutions Scope    
14 November 2022 Page 3 of 6 Prepared by Will Burnish 
1 Purpose of the Service 
The purpose of this Service is to provide technical support on possible temporary solutions
to Cloddach Bridge to allow it to be opened to support 3.5T vehicles only. The following are
the key outputs from this scope:-
 Report setting out possible temporary solutions
 Approximate costs for each solution
 Advantages and Dis-advantages for each solution
 Recommendations 
2 Description of the Service
Cloddach Bridge was built in 1905 with an estimated design-life of between 100 and 120
years, after which it would require significant refurbishment or replacement. This bridge is
located on the C2E road and a traffic survey undertaken in 2020 showed the average
number of vehicles crossing the bridge each day was less than 800. Figure 1 shows the site
location.  The Grid Reference for the centre of the site is NJ 21136 64788. 
Principal Inspections were undertaken on the bridge in 1995, 1997 and 2019. In 2001 a
weight restriction of 7.5 Tonnes was applied to the bridge and following the Principal
Inspection and Structural Assessment undertaken in 2019, the allowable weight was reduced
to 3 Tonnes. 
A Special Inspection undertaken in February 2022 indicated significant deterioration and a
load bearing capacity of less than 3 Tonnes. Based on this assessment Cloddach Bridge was
temporarily closed to motor vehicles in the interest of public safety. The maximum length of
diversion required because of this closure is 6 miles. 
A Principal Inspection and Structural Assessment was undertaken mid-February 2022, with
the Structural Analysis completed by the end of March This independent Structural
Assessment used more complex analysis techniques that provide more detail on the
structural condition of the bridge. 
The Service is to provide an assessment of a temporary solution to allow the bridge to be
reopened to vehicular traffic. The assessment is to be based on the following criteria:-
 Anticipated life span greater than 10 years
 Cost less than £2m
 Minimum load capacity of 3.5t with FOS
 Load capacity of 7.5t with FOS
 Minimum width 2.4m
 N1 Parapet restraint 
The Options to be considered are:-
1. Reduction in the width to allow running on in-beams only (or minor upgrades)
2. Repairs to existing structural  elements
3. Installation of temporary bridge over existing using existing piers and abutments
4. Installation of temporary bridge using existing abutments only
5. Installation of temporary propping to support structure 
As part of the review process, a meeting should be held with the relevant sections within
Moray council to discuss what ancillary works will be required for options which have made
it past screening. This meeting will be approximately 4 hours. 
Page 117

Page 118

Cloddach Bridge Temporary Solutions Scope    
14 November 2022 Page 4 of 6 Prepared by Will Burnish 
Task Detail Required
by
Screening Report of
Proposed Temporary
Options.
Produce a Screening Report to determine which temporary
repair solutions proposed meet the baseline criteria. There is
no weighting to be applied. If the Option fails a Screening
Question it is to be rejected. For each Option that is rejected
the reason for its rejection is to be detailed in the report. The
following are the screening questions to be used:-
 Likely design life of greater than 10 years
 Provide minimum width of 2.4m
 Initial cost estimate less than £2m
 Load capacity 3.5t or greater 
27th March
2023
Temporary Options
Report
Produce an Options Assessment Report for the listed
Options. The report must show how each Option performs
against the assessment criteria. Each Option must have:
 an indicative cost, including whole life costing;
 the anticipated servable life;
 Advantages and Disadvantage; and 
 financial risks. 
The Report should include the do minimum and do nothing
Options. 
The Report should identify the preferred option, based on
value for money. 
28th April
2023
Table 1: Scope to be undertaken 
The Consultant delivers the Service in accordance with the framework information; the work package
conditions NEC3 Professional Services Short Contract, April 2013 as amended by the Data to be applied to a
package order and the individual Work Package Scope. 
The Consultant acts as Lead Consultant liaising with all other members of the Project Team as directed by the
Client through all stages appropriate to the appointment. 
The Client has appointed Will Burnish as Client’s Agent and Client Project Manager the Consultant liaises with
relevant person as instructed by the Client and in accordance with clause Z38 “Working with Others” of the
work package conditions NEC3 Professional Services Short Contract April 2013. 
The Consultant ensures that all information and assistance is timeously provided to enable other members of
the Project Team to provide the Service required of them by the Client. 
The Consultant prepares all designs, specifications, schedules and calculations in accordance with the relevant
standards and codes of practice for the relevant discipline. 
The Consultant liaises with all external statutory authority parties and public utility bodies as necessary to
obtain and ensure all consents are granted and are in place as required in relation to the agreed programme
throughout the stages of the project. The Consultant advises the Client of all potential issues arising from the
design development which effects the obtainment of such consents. The Consultant advises the Client of any
anticipated changes in legislation known at the time of design development which may affect such consents. 
3 Existing information
See Section 7 
Page 118

Page 119

Cloddach Bridge Temporary Solutions Scope    
14 November 2022 Page 5 of 6 Prepared by Will Burnish 
If there is existing information available on the site, including topographical survey, site investigation report
and existing site Services, the Consultant takes full responsibility for developing this information as a basis for
design proposals, verifying if the information is current and ensuring changes are updated. The Client makes
no representation to the accuracy or completeness of any such information and it shall always be for the
Consultant to satisfy themselves as to the accuracy or completeness of such information. 
4 Specifications and Standards
The list is not exhaustive and the Consultant must ensure that they apply all relevant
standards and best practice:-
 Design Manual for Roads and Bridges
 Specification for Highway Works 
The Consultant proposes and utilises suitably qualified personnel to deliver each Work Package.
The Consultant has due regard to the Client’s commitment to provide high quality service which give value
for money. The Consultant gives particular attention to and is required to achieve a high standard of quality,
achievable within budget,  in every aspect of the Service including the design, function and operational
standards, the capital, maintenance and running costs, the overall control and management of the works,
compliance with the programmes, achieving cost targets and the effect on the environment. 
The Client specifies the specific Service to be provided and the specific Scope for each Work Package at the
time of issue of a Package Order. The Consultant carries out the Work Package in accordance with relevant
technical standards including:
 British standards;
 EU standards;
 Statutory requirements;
 Relevant Client procedural standing orders and financial regulations;
 Good Industry Practice;
 Health and safety legislation;
 any Client policies or guidance relating to the work, and
 any other requirements specified by the Client in the Scope for each Work Package.
If the Consultant considers it necessary to depart from any technical standard, he notifies the Client of
the proposed departure and the reasons for such departure.
The Consultant may be required to perform the Services while based:
o at the Consultant’s offices,
o at the Client  offices, or 
o at a relevant site.
If Service is being provided while based at the Client offices, the Consultant and the Consultant’s staff comply
with all policies, procedures and instructions given to him by the Client in relation to access, conduct, health
and safety and use of any facilities. 
If Service is being provided at a relevant site, the Consultant and the Consultant’s staff comply with all
policies, procedures and instructions relevant to working at the site in relation to access, conduct, health and
safety and use of any facilities. Prior to the commencement of the Service at a relevant site, the Consultant
ensures that his staff receive adequate training in health and safety procedures and the use of the necessary
personal safety equipment. 
The Consultant may be required to provide site accommodation and/or welfare facilities for his staff working
at a relevant site where these are not provided by the Client or Others. 
The Consultant will be responsible for gaining any permissions or approvals required from others necessary
to carry out the Service. 
The Consultant complies with all legislative and statutory requirements relating to the type of Services
undertaken in any Work Package. 
Data and file transfer between the Consultant and the Client may be undertaken electronically, with the
appropriate information and specific arrangements stated within the Scope for each particular Work
Package.
Page 119

Page 120

Cloddach Bridge Temporary Solutions Scope    
14 November 2022 Page 6 of 6 Prepared by Will Burnish 
All records, correspondence, data files, documents and drawings relating to specific Work Packages under
the Framework Contract shall be archived to CD. All files must be verified before archiving. 
5 Constraints on how the Consultant is to provide the Service
The following are the key constraints on how the project is to be delivered:-
 Initial Screen Report to be complete within 3 (Three) weeks of contact award
 Full Report issued within 8 (Eight) weeks on contact award 
6 Requirements for the programme
A Programme for the works is to be issued within 2 (Two) weeks of contract award. The
Programme must contain as a minimum the following key milestone:-
 Start of Contract
 Completion of Initial Assessment Memo
 Draft Issues of Initial Assessment Memo
 Issue of Final Initial Assessment Memo
 Completion of Options Report
 Draft Issues  of Options Report
 Issue of Final Options Report 
Programme is to be undated every 2(Two) weeks following 1st issue of the Programme. 
The Consultant will be responsible for arranging regular meetings with the Client to review progress on each
Work Package including progress against the Accepted Programme, a review of any risks, early warnings and
compensation events and review of any cost estimates. These will normally be on a monthly basis, or such
other period as agreed for a specific Work Package. 
The Accepted Programme for a Work Package should be produced and maintained using Microsoft Project.
The Consultant ensures that the Programme and status for each activity to be carried out under the Work
Package is up to date prior to any meeting.  The Programme shall detail the baseline programme as well as the
current Accepted Programme, in order that progress against each activity and the completion date can be
evaluated. 
7 Information and other things provided by the Client
The following information will be provided as part of this Scope:-
1. Cloddach Bridge Inspection Report   - 27 Sep 1995
2. Cloddach Bridge Assessment Calculations - 06 Feb 1996
3. Cloddach Bridge Inspection Report   - 17 July 1997
4. Cloddach Bridge Assessment Calculations - 26 July 2000
5. Cloddach Bridge Principal Inspection Report - 26 Sep 2019
6. Cloddach Bridge PI Defect Sketch (.dwg)  - 26 Sep 2019
7. Cloddach Bridge Load Review Calculations - 17 Oct 2019 (Check 11 Mar 2020)
8. Cloddach Bridge Special Inspection Report - 28 Jan 2022
9. Cloddach Bridge Inspection Report   - Mar 2022
10. Cloddach Bridge Assessment Calculations - Mar 2022 
Page 120

Page 121

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 7 FEBRUARY 2023 
SUBJECT: PORT MARINE SAFETY CODE QUARTERLY REPORT –
QUARTER 3 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee on matters of Marine Safety and compliance with the
Port Marine Safety Code (PMSC) for the period Q3 year 2022/23. 
1.2 This report is submitted to Committee in terms of Section III (F) (25) of the
Council's Scheme of Administration relating to the functions of Council as
Statutory Harbour Authority (SHA). 
2. RECOMMENDATION 
2.1 Committee is asked to consider and note the safety performance,
fulfilling its function as Duty Holder under the Port Marine Safety Code. 
3. BACKGROUND 
3.1 Under the statutory requirements of the Port Marine Safety Code (PMSC) the
organisation (Moray Council) must appoint a duty holder to ensure
compliance with the PMSC is achieved. The organisation must provide a
report on PMSC performance annually as a minimum. 
3.2 The role of Duty Holders is held by Members of this committee. The role
requires accountability for ensuring the organisation’s compliance with the
PMSC. 
3.3 At a meeting of this committee on 20 March 2018 it was agreed that a report
on PMSC would be submitted quarterly (paragraph 6 of the minute refers) 
3.4 Moray Council, in its capacity as a Statutory Harbour Authority, is committed
to undertaking and regulating marine operations to safeguard all its harbour
areas, the users, the public and the environment through its Safety
Management System (SMS). 
Item 10
Page 121

Page 122

4. Q3 Review 
4.1 The following sections of the report set out an overview of marine safety
performance for Q3 of 2022/23. 
PMSC Audit 
4.2 A full annual audit of Moray Council compliance with PMSC was carried out
by Marex Marine, within their capacity as designated person. The Audit was
conducted at Buckie Harbour Office on 12 October 2021 and concluded that
the Moray Council harbours are compliant with the PMSC. The Audit process
made observations. The open items from this are provided in the table below. 
Observation Progression
Review Harbour Bye-laws with
particular regard to continued
relevancy
Liaison with legal service required to
establish a time to review bye-laws
during 2022/23. Target Date
completion 31/12/23
Consider cyber security protocols Addition of cyber security policy to be
added to SMS during review cycle
including update of IT systems in new
harbour office. IT consultation is
ongoing with council officers during
process of office move. Target Date
completion 31/01/23
SMS updates, rewording suggestions Review of SMS completed.
Compilation draft of new document
being finalised ready to be presented
for consultation and approval at
annual audit set for 8 Feb 23. Audit
findings presented to duty holders at
next ED/I committee due in May 2023.
Consideration of adding extra safety
signs around harbour
In conjunction with ongoing water
safety group meetings and work
stream considerations for signs
required to be discussed. Signs on
order and being produced currently.
Target Date for completion 31/01/22
Increasing drills carried out with
external institutions suggested
Plans to be made to include exercises
with local fire brigade large scale
cross council drill to be organised with
Aberdeenshire council with
Emergency planning officer. Revised
target date end of September 2023 
4.3 The 2022/23 Annual Audit conducted by Marex Marine will now take place at
Buckie Harbour on 8 February 2023 due to absences and moving of harbour
office commitments. The report and findings will be brought to this committee
at the next scheduled date. 
4.4 The Audit will be focused on updates to the safety management system which
have been undertaken and on the risk assessment processes in place within
the harbours. 
Page 122

Page 123

Key Performance Indicators  
4.5 Details of the Council’s compliance with PMSC are provided below. 
Q3 Accident, Incident and Near Miss Statistics 
4.6 Incident statistics Summary Table 
Quarter Injuries Incidents Near Misses
3 0 0 0 
4.7 No Incidents or accidents to report. 
Aids to Navigation 
4.8 As a Local Lighthouse Authority, Moray Council is required to report the
availability of all of its navigational lights to the Northern Lighthouse Board in
March of each year. Currently the Port Closed light on the North Pier in Buckie
is unavailable, resulting in availability figures being decreased. This has been
discussed with the Northern Lighthouse Board and they have noted it is not an
urgent requirement as the light is not mandatory and other provisions to
communicate any port closures are available. 
4.9 New solar powered lights will be installed in Burghead and Buckie. The new
solar powered lighting will decrease the number of faults observed and as a
result lead to an increase in the availability figures for all navigational aids.
This work has been funded by Scottish Government Marine Fund Scotland
Scheme and installation will be completed after completion of harbour office
move and appropriate weather conditions exist with a target completion by
end of March 2023. 
4.10  Notice to Mariners 04 2022 was issued on the 15 December 2022 notifying all
mariners that the Mucks Navigation light is extinguished.  A suitable
replacement has been located and will be installed on the next weather/tidal
window available with the harbour team committed to doing this whatever day
is suitable.  
4.11 The table below summarises the availability of Navigational lights under
Moray Council’s responsibility. 
The ‘Availability Objective’ is calculated over a rolling 3-year period. This
means that over this period a Cat 1 Aid to Navigation needs to be functional
for 99.8% of the time. Currently Moray Council is meeting this target. The
availability of Cat 2 and 3 lights is below the target availability.
Page 123

Page 124

4.12 The target for the year 2022/23 is to increase the availability figures of Cat 2
lights to 95% and Cat 3 lights to 97%. This will be achieved by utilisation of
new solar powered lights that once installed, planned by end of Feb 23, will
provide more efficiency due to less reliance on unsuitable cabling, prone to
faults. 
Pilotage 
4.13 Pilotage is not compulsory at Buckie harbour, therefore, not all cargo
movements require the services of a pilot. The number of pilotage acts carried
out in the third quarter of 2022/23 was 10 acts of pilotage in relation to 32
vessel movements, 7 of which were at night. 
Training 
4.14 There are currently two members of staff deemed competent to pilot, one
unrestricted and one restricted to daylight hours.  By end of Q3 it was
anticipated that both members of staff would be competent to pilot without
restrictions and that a third member of staff would be fully trained. Currently,
one pilot is still training due to lack of pilotage opportunities and will be
deemed competent within the coming weeks. Training will begin for other
harbour staff after completion of the current pilot trainee during Q4 with 2 new
harbour assistants beginning training. 
4.15 Training for Port Facility Security is currently being sourced to be completed
by 2 members of staff. Currently harbours are compliant with PMSC and
International ship and port facility code (ISPS) however additional trained staff
will provide additional resilience and shared responsibilities. 
Staffing 
4.16 One member of staff remains absent from work due to long term sickness and
this post is being covered by an agency appointed officer until Occupational
Health recommendations and advice have been confirmed. This is scheduled
to be concluded by end of January 2023. 
4.17 Recruitment for MV Selkie staff is ongoing with a new recruitment round for
vessel master being undertaken during Q4.   
Conservancy 
4.18 Dredging has continued into quarter 3 of 2022/23, with priority given to Buckie
navigational channel and Burghead channel when weather and tide permitted.
There has also been significant work undertaken at Portknockie. 
4.19 From 1 October 2022 to 31 December 2022 the total amount of spoil removed
to designated spoil grounds was 3360 Tonnes over 23 digging days. This
includes the harbours at Portknockie and Buckie (see table 2 para 4.25). 
4.20 Burghead groyne is at the end of its serviceable life, which is increasing the
deposition of sediment at the harbour channel.  A contract has been awarded
to undertake significant maintenance work to the groyne.  This work is subject
Page 124

Page 125

to a marine licence which is currently being progressed by Marine Scotland
and is due to begin during Q4 
4.21 In Buckie the current depth under chart datum is officially 2.1 Metres with
relevant Notice to Mariners promulgated. There has been significant
improvement in the depth of the channel as a result of work carried out in Q1
Q2 and Q3. Indication from Selkie and pilot boat sounding is that depth under
chart datum exceeds 2.5 metres. These soundings are subject to official
bathymetric survey which is being coordinated to be completed early February
2023. 
4.22 There is a Notice to Mariners published warning vessels of the fluctuating
depths within the entrance channel of Burghead advising all mariners to
contact Harbourmaster for accurate information and tidal information. 
4.23  The priority areas for dredging remain Burghead (sand bank approaching
harbour entrance) and Buckie (entrance channel).The agreed capital works to
undertake outsourced dredging, (agreed on 29 June 2022 paragraph 22 of the
minute refers,) is currently progressing with preparation works. Sediment
sampling and its analysis is being procured and conducted to satisfy Marine
Scotland licencing requirements. Marine Scotland have accepted all sediment
sample plans and procurement and organisation of the analysis works is
being undertaken. The planned works will incorporate work to dredge all
harbour basins in Buckie utilising a combination of Selkie and external vessel. 
The timetable for external dredging is as follows: 
Page 125

Page 126

Other dredging requirements include:   
• Hopeman: Different options to increase the efficiency of dredging at
Hopeman are being considered and a plan detailing these will be
developed in 2022/23.
• Cullen: dredging by the Selkie will focus on the beach side of the basin.
• Findochty: Further dredging is required at the entrance channel to
complete work started in Q2. 
4.24 There has been an increase in available water under chart datum of 1.0 metre
in the west basin and channel at Findochty harbour as a result of the dredging
campaign in 2021/22. Dredging in Q2 of 2022/23 has removed 540 tonnes of
spoil from the entrance area and approach to the new pontoons, maintaining
good access to all vessels. 
Selkie 
4.25 MV Selkie has completed works within Buckie and Portknockie during the
third quarter of 2022/23. The table below summarises the work carried out
during this quarter: 
Table 1: Days worked and total tonnage removed Q3 2022/23 vs Q1 and Q2 2022/23 and Q4 2021/22
Year Days
working
Weather
days
Maintenance Working
days %
Tonnage
Removed
2022/23
Q3
23 13 14 46 3,360
2022/23
Q2
24 17 14 44 3,260
2022/23
Q1
30 12 20 48 3,460
2021/22
Q4
24 30 9 38 3,330 
Table 2: Summary of works carried out per harbour during Q3
Harbour Cumulative
working days
Cumulative
weather days
Cumulative
maintenance
days
Tonnage
removed
Buckie 21 13 14 2,820
Portknockie 2 0 0 540
Total (%) 23 (46) 13 (26) 14 (28) 3,360 
Page 126

Page 127

4.26 During the Q3 of 2022/23 there has been a slight increase to a total of 3,360
tonnes compared to the previous quarter (Q2 3,260, see Table 1 para 4.25).
This total has been completed over 23 working days which is an increase in
working day percentage from 44% to 46%. 
4.27 The updated figures for the current year 2022/23 are now 46% working days
25% weather days and 29% maintenance days (planned and unplanned).
This is still below the target KPI of 50% working days (see paragraph 4.31). 
Table 3: Comparison of working days compared to weather and maintenance
Year Days working % Weather days % Maintenance %
2022/23 Total 46 25 29
2022/23 Q3 46 26 28
2022/23 Q2 44 31 25
2022/23 Q1 48 20 32 
4.28 The plan for increased efficiency moving forward is to maximise the number of
days crewed on vessel and continue to work effectively with maintenance to
lower the number of maintenance days. A computer based planned
maintenance system on board Selkie and throughout the harbours is now
delivered and is currently being readied and tested for full use and has begun
to be used in Q3. This system will increase efficiency of auditing maintenance,
allow greater ability to scrutinise maintenance and its history and allow remote
access monitoring of all maintenance. 
4.29 The procurement process to install Marine mammal observation equipment is
currently underway with a planned date of installation to occur at end of
February 2023.  This equipment will allow Selkie to work in more marginal
weather conditions above a force 3 at spoil dumping grounds. This will further
improve the efficiency of dredging operations.  
Environmental Considerations 
4.30 There has been continuing work carried out with the focus on lowering carbon
emissions and promoting overall environmentally sound practices within the
harbours. This includes plans to upgrade the electrical infrastructure available
within Buckie harbour, allowing less reliance on fossil fuel generators for
power.
4.31  KPI Summary Table 
KPI Progress at the end of Q2 Completion Target Date 
Conservancy 
Buckie Channel Depth
3.0M
Current official depth 2.1M
(2.5 M sounded by pilot boat)
31/03/23
Buckie Basin 1/2/3
depth 3.0M
Current depth 2.2M Review of progress 31/03/23
Fully achieved by 31/08/23
work currently being
undertaken by Selkie
Provide 0.3M channel
Burghead
Current depth 0.0M Review of progress 31/03/23
Fully achieved by 31/08/23
Page 127

Page 128

Productivity 
Maintenance days less
than 20%
Currently 29% Continuous review
Working days greater
than 50%
Currently 46% Continuous review
Total minimum
tonnage removed
above 14,120 Tonnes
(aspirational target
18,000 Tonnes)
End of Q3 10,080 (annual
projection therefore 13,446)
31/03/23
Total working days
above 77 (target 100)
77 end of Q3 (therefore
completion of initial target 77)
31/03/23 
Staffing 
Full Time master Q4 recruitment campaign
(long term skilled agency
worker currently)
30/09/22 postponed due to
staffing issues within harbour
office and long term absence.
reviewed target 31/03/23 
Safety management/
Maintenance 
SMS review and
Update
Reviewed and awaiting audit
review by designated person
to be carried out Feb 23
15/02/23
Full Risk assessment
update
In progress annual review
completed.
31/10/22
Planned maintenance
system
implementation
Procured and installed, assets
being added to database for
complete functionality initial
usage underway
31/08/22 
Financial 
Lower Running costs to
within Budget
To be reviewed 31/03/23 
4.32 Graph of Selkie Working availability trends 
2021/22 2022/23 Q1 2022/23 Q2 2022/23 Q3
Working Days 39 48 44 46
Maintenance Days 30 32 25 28
Weather days 31 20 31 26
0
10
20
30
40
50
60
Percentage of crewed days
Quarterly comparisons
Selkie working percentage trends
Working Days Maintenance Days Weather days
Page 128

Page 129

4.33 The general pattern of Selkie working day availability compared across
quarters in 2022/23 vs 2021/22 shows a slight decrease in maintenance days
and overall a slight increase in working days. There is however still continued
improvement required to reach the desired KPIs highlighted in the table in
paragraph 4.34 above. A trend graph will continue to be added in future
reports to highlight progress toward KPIs identified for working day and
maintenance day targets. 
5. General Safety Updates 
Safety related works 
5.1 There have been a number of jobs completed during Q2 improving safety
conditions within all harbours, these works include: 
• Various lighting repairs in all harbours.
• Remove protruding piece of rebar causing a health and safety risk.
• Housekeeping across all harbours ensuring all areas are safe and
clean.
• Move and replace cargo vessel fenders in Buckie.
• Replace lifebuoy ropes in all harbours where needed.
• Install handrails to allow safer egress for the Boxing day swimmers at
Burghead.
• Install various other handrails across all harbours.
• Replace sand bags to secure barriers at Findochty and Cullen.
• Change out various rope ladders across all harbours.
• Replaced searchlight on Pathfinder and carried out other maintenance
on board. 
Signage 
5.2 The signs listed below have been ordered and will be erected when received. 
1. Four signs to restrict general access to the pontoons.
2. Harbour operations signs.
3. Designated visitor berths.
4. Operational speed restrictions
5. Keep slipway clear signs. 
6. Buckie Harbour operational Update 
6.1 All leases and relevant legal papers have been signed and concluded with
respect to offshore wind energy Operations and Maintenance base. Work to
begin new office buildings and quayside assets for offshore wind base are
now underway. 
6.2 Buckie harbour office now temporarily located within Buckie Drifter building
and remains fully operational in shared building with Offshore wind energy
company as new office buildings are developed for Harbour office and
Offshore wind O/M base. 
6.3 New weighbridge constructed and completed to west side of existing
Fishmarket building providing new improved weighbridge facility. Facility has
Page 129

Page 130

safer accessibility as well as closer proximity to cargo handling facilities and
eventual harbour office location. 
7. Objectives identified for remaining quarter of 2022/23 
• Publishing of updated SMS: the revised SMS will be presented to a
future meeting of this committee once audited in February 23.
• Undertake further reviews of Marine Policy and Harbour Bye-laws by
harbour staff ready to pass on to legal representatives in financial year
23/24.
• Review training requirements and request necessary training.
• Continue momentum of Pilot training and accreditation leading to 2 fully  
competent Pilots within the Harbour team by end of Q4.
• 2022/23 PMSC audit February 2023 and provide report at end of Q4. 
8.  SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)
Sustainable harbours maintained to operate safely and efficiently
contribute to the economic development of Moray. 
(b) Policy and Legal
Non-compliance with the PMSC will have legal implications. 
(c) Financial implications
Non-compliance of the PMSC may have financial implications. 
(d) Risk Implications
Failure to comply with the PMSC could result in prosecution of the
authority. 
(e) Staffing Implications
No staffing implications arise from this report. 
(f) Property
There are no property implications arising from this report. 
(g) Equalities/Socio Economic Impact
There are no specific equalities matters, however, the Equalities Officer
has been consulted and comments incorporated into this report. 
(h) Climate Change and Biodiversity Impacts
There are no climate change and biodiversity implications arising from
this report. 
(i) Consultations
The Depute Chief Executive (Economy, Environment and Finance),
Head of Environmental and Commercial Services, Legal Services
Manager, Head of Financial Services, Committee Services Officer (L
Rowan), and Equalities Officer have all been consulted and their
comments incorporated into this report. 
Page 130

Page 131

9.       CONCLUSION 
9.1 The Council is currently deemed to be compliant with the PMSC, 
however, work to maintain a safe environment remains an ongoing 
matter in a dynamic environment. Diligent staffing and constant 
monitoring and risk assessing will be utilised to maintain compliance as 
demands evolve. 
Author of Report: Stuart Akass, Development and Operations Manager
(Harbours)
Background Papers: 
Ref: SPMAN-524642768-840 
Page 131

Page 132

Page 132

Page 133

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 7 FEBRUARY 2023 
SUBJECT: USE OF GLYPHOSATE TO CONTROL WEEDS IN OPEN
SPACES 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE 
1. REASON FOR REPORT 
1.1 To inform the Committee of the legally approved use of Glyphosate and
advise on the Council’s use of Glyphosate to control weeds in open spaces;   
1.2 This report is submitted to Committee in terms of Section III (F) (11) of the
Council's Scheme of Administration relating to exercising functions in relation
to parks, open spaces and woodland management and maintenance. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee:- 
(i) note that although there are public concerns, Glyphosate is
legally approved for use in Great Britain until December 2025 and
that it continues to be the most cost effective and efficient method
of managing weeds; 
(ii) approves the proposals to reduce the use of Glyphosate through
a managed approach in certain settings as outlined in paragraph
6.3, and note that whilst these can be introduced without
additional cost a greater presence of weeds and longer vegetation
would need to be accepted and tolerated within the environment; 
(iii) note that Officers will continue to monitor the cost and
effectiveness of alternative approaches of weed control. 
3. BACKGROUND 
3.1 Glyphosate is the active substance in many herbicides (weed killers) and is
widely used to control most weed species including perennials and grasses.
First used in Great Britain (GB) in 1979, Glyphosate is a translocated,
systemic herbicide which on contact moves through the plant to kill the shoots
Item 11
Page 133

Page 134

and roots.  It is used to kill actively growing plants but does not stop new
weeds from growing. 
3.2 As well as its widespread use in agricultural, forestry and amenity
environments it is commonly used by local authorities to control weeds as it
provides a cost effective and efficient means of control. 
3.3 Glyphosate is currently approved for use in the EU until December 2023 and
in GB until December 2025.    Further information can be found here. 
3.4 Glyphosate’s EU approval was due to expire in December 2022 however on 2
December 2022, the European Commission extended its approval for one
year until 15 December 2023.  This decision was taken to allow the EFSA
sufficient time to conclude its peer review which is due to be completed in July
2023.   
3.5 Information sourced from the Health & Safety Executive (HSE) advises that
the UK has a rigorous approval process for pesticides.  The main aim of this
process is to protect the health of people, creatures and plants, and to
safeguard the environment.  This process has been applied to glyphosate
which has been approved as safe and efficacious.  The risks associated with
the use of pesticides in amenity situations such as parks and open spaces are
specifically considered as part of the authorisation process.  Legally
enforceable conditions of use are imposed on the way products can be
applied to ensure the public are not exposed to levels of pesticides that would
harm health or have unacceptable effects on the environment. Further
guidance provided by the Health & Safety Executive can be found here. 
3.6 There are however, increasing concerns about the potential harmful effects of
glyphosate on human health, wildlife and the environment.  In response to
such concerns a growing number of local authorities are reviewing or have
stopped or reduced its use of Glyphosate and are adopting alternative
methods of weed control.   
3.7 The HSE also notes that following the publication of a report from the
International Agency for Research on Cancer (IARC) in 2015 which found that
glyphosate was ‘a probable human carcinogen’, there has been a lot of
debate across the world as whether herbicides which contain glyphosate are
safe to use.   
3.8  The Association of Public Service Excellence (APSE) recently provided a
briefing to its members on glyphosate and advised that: 
• there is no right or wrong answer to the question is it safe to use 
glyphosate products. 
• national agencies across the world have declared glyphosate to be 
safe to use; however, some countries have now decided to ban 
glyphosate or severely curtail its use; the UK continues to say 
glyphosate based products are safe to use.
• the use of glyphosate-based products is still legal in the UK so local 
authorities cannot be prosecuted for using these products. 
Page 134

Page 135

• there are few alternatives to glyphosate and those which are seen as 
alternatives are often still in a pilot phase and much more expensive to 
use. 
• some local authorities have taken to ban glyphosate and glyphosate-
based herbicide use totally, or at least in specific areas such as 
schools, playgrounds, parks and pavements. 
• the Health and Safety Executive enforce regulations relating to the 
advertisement, sale, storage, supply and use of pesticides. 
• there may be a need for the public to accept higher levels of weeds if 
the use of glyphosate is banned or reduced. 
3.9 New alternative approaches are being introduced and trialled by a number of
local authorities but as stated in the APSE report, these are more expensive
and sometimes not as effective.  In addition, APSE have also advised that
‘local authorities should take the opportunity whilst the use of glyphosate
remains lawful to identify an appropriate cost effective solution and potential
alternative products'. 
3.10 The Council’s Open Space Operations team recognise that herbicides
containing glyphosate continue to provide the most cost effective and efficient
method of weed control across the Council’s estate.  Measures have however
been taken to reduce the use of glyphosate where possible.  This includes
reducing treatments around amenity grass plots where grass cutting
machinery can easily access to control vegetation, and mulching of some
shrub beds and other amenity plantings to supress weeds.  In addition, the
team has introduced areas of less frequent grass cutting to allow wildflowers
to thrive to support biodiversity and to reduce the need for herbicides in these
areas.   
3.11 The Scottish Government carried out a detailed survey of local authority
pesticide usage in Scotland in 2019.  The survey found that all responding
local authorities adopt a combination of herbicide and non-chemical weed
control strategies.  The most commonly used non chemical methods were
mechanical control: cutting, strimming, mowing, flailing and supressing weed
growth with mulches.  Where herbicides were applied, all respondents stated
that they took steps to reduce their use, primarily by evaluating whether there
were alternative non-chemical control measures and by minimising and
targeting herbicide use. The main reasons stated for choosing to use
herbicides over alternative controls were for control of invasive weeds,
maintenance of acceptable visual appearance and protection of infrastructure.
Where herbicides were used, they were reported to be more effective over a
longer period, with a lower associated cost, than alternatives. Some local
authorities also reported that there was limited availability of alternative control
methods.   
3.12 Some Scottish local authorities have taken measures to reduce or limit their
use of glyphosate.  For example, Highland Council operates a partial ban on
the use of products containing glyphosate with the ban preventing use at
sports and recreation facilities, play areas and schools.  Aberdeen City
Council continue to use glyphosate having not yet found a cost effective
alternative but continue to review techniques to try to reduce its use. They
have also trialled flame treatments and foam/hot water controls in the city
Page 135

Page 136

centre but have found these very labour intensive and not cost effective to use
elsewhere.  Similarly, Aberdeenshire Council continue to use glyphosate and
have trialled alternatives but with limited success so far, therefore they
continue to look for alternative options.  Midlothian Council introduced a
complete ban in 2019 but then approved officer recommendations in 2021 to
permit its continued but limited use whilst committing to reduce average
annual use.  Glyphosate based herbicides offers the most effective control for
non-native invasive species like Giant Hogweed and therefore other
organisations, e.g. the Scottish Invasive Species Initiative led by NatureScot
work to control non-native species along riversides in Northern Scotland,
continue to treat these plants with herbicide as it provides the most effective
control. 
4. Current Use of Glyphosate 
4.1 Weed control is an important task within the Council’s grounds maintenance
programme for the following reasons: 
• weed growth can cause damage to infrastructure, e.g. paths, kerbs,
walls, fences, headstones, roads.
• ineffective weed control can be perceived by some as a poorly
maintained or a neglected environment due to the appearance of the
environment where weeds are present and vegetation is not controlled.
• uncontrolled weeds can generate complaints from residents (although
there is a growing interest in accepting weeds and uncontrolled
vegetation within our environment, in particular to support and promote
biodiversity. This includes species such as dandelions, daisies, thistles,
groundsel, willowherb).
• to control non-native invasive plant species like Giant Hogweed and
Japanese Knotweed which can present issues with public safety and
structural damage respectively if not treated. Glyphosate is also an
important tool to prevent the spread of invasive species such as
Rhododendron ponticum and Himalayan balsam. 
4.2 The Operations team uses Glyphosate as part of its grounds maintenance
programme to control weeds in open spaces including: 
• within shrub and rose beds
• around cemetery headstones
• around obstacles inaccessible to grass cutting equipment across green
spaces (e.g. benches, road signs, lamp posts, fence lines, drain covers,
tree bases etc.)
• in play areas and around bark safety surfacing pits
• in cemetery car parks
• on path surfaces in parks, cemeteries and open spaces to reduce trip
hazards, protect infrastructure and manage the appearance of these
spaces
• to control non-native invasive plants (Giant Hogweed and Japanese
Knotweed)
• within schools grounds - shrub beds, play areas, obstacles, paths and
fence lines (applied during school holidays)
• around war memorials
Page 136

Page 137

• housing property gardens
• harbour hard surfaces/paths
• Industrial Estates 
• highways – along kerb edges and back lines of pavements and housing
lanes to remove potential trip hazards and protect pavement
infrastructure 
4.3 Herbicides are applied using pressurised sprayers (knapsacks) and Controlled
Droplet Applicators (CDAs).  Operatives are trained in the safe use and
application of herbicides and comply with the Code for the Safe Use of
Pesticides and Control of Pesticide Regulations.  Product labels guide
operatives on approved use and application rates alongside product Safety
Data Sheets and our own operational risk assessments and COSHH (Control
of Substances Hazardous to Health) assessments. 
5.      Weed Control Costs 
5.1 The cost of purchasing Glyphosate based herbicides is approximately
£20,500 per annum. 
5.2 Limited resources has not allowed for the Open Space grounds maintenance
asset management database to be updated in recent years and therefore our
mapping and asset data is no longer accurate.  It is however estimated that
the cost of applying herbicides as part of programmed work in open spaces is
£58k per annum.  A range of adhoc weed control works is also carried out
each year for other services including Housing, Education, Property and
Roads with labour costs to deliver this estimated at £26k per annum. 
5.3 The annual weed control programme using herbicides is therefore estimated
to cost £104,500. 
5.4 Glyphosate has continued to be used by the Council as it provides a cost
effective and efficient means of weed control when compared to alternatives. 
Whilst not eliminating weeds in the environment entirely our current
programme of treatments provides reasonably effective control. 
5.5 This effective and efficient control is important particularly given our limited
operational resources for grounds maintenance operations.  The service
currently operates with limited staff numbers and is already stretched to
deliver the annual programme of grounds maintenance services across
Moray, and where the work of grounds maintenance staff is also prioritised for
burials over grounds maintenance works to meet service demands.   The
team’s focus has therefore been on carrying out operational tasks in the most
efficient and cost effective manner given there is no available staff capacity to
increase manual methods of weed control or for trialling alternatives which are
costly and more labour intensive. 
6.   Alternatives to Glyphosate 
6.1  There are a number of alternatives to the use of herbicides containing
glyphosate including: thermal controls (flame, hot water and/or foam), acetic
Page 137

Page 138

acid (active ingredient in vinegar), manual controls (hand, tool or machinery
removal), fatty acids (pelargonic acid) and electricity. Appendix 1 provides a
summary of these alternatives - each have their pros and cons with none
considered suitable as a direct cost effective or efficacious replacement for
glyphosate based herbicides. 
6.2 Further officer time and resources would be required to more fully research
these alternatives beyond the summary contained within this report. 
6.3 APSE advice is that the use of alternatives to Glyphosate will add to revenue
costs for weed control (including labour, materials, vehicles, and fuel), with
many requiring capital investment.  Officers continue to monitor experiences
of other local authorities through the APSE member network and trade
journals and have noted to date that in general others have found alternatives
to be less effective, more costly and labour intensive, and that alternative
methods of control could increase labour and costs manifold. 
6.4 Given the increased costs associated with alternative controls, including the
additional staff needed to resource more frequent treatments than currently
required through the use of glyphosate, the following approach could be
introduced without cost to reduce the use of Glyphosate, providing a greater
presence of weeds and longer vegetation is accepted and tolerated within the
environment. 
• Tree bases:  cease application of herbicides to control weeds at the base
of trees in streets and green spaces and tolerate / accept longer grass in
these locations (excluding cemeteries given the sensitive nature of
cemeteries and gardens of remembrance and the perceived link between
visual appearance and dignity of the deceased). 
• Play areas:  cease application of herbicides to control weeds in 58 play
areas with fixed play equipment and where there is grass matting safety
surfacing installed and accept the presence of weeds and longer grass
within and around these assets; and similarly cease application of
herbicides in 16 play areas where rubber crumb surfacing is installed and
where the opportunity for weeds is low (this approach excludes 44 play
areas across our estate where safety surfacing is formed from bark pits
and where targeted herbicide control will continue to be required to
prevent weed growth from establishing and for the safety surfacing to
perform its function effectively).   
• Obstacles: cease application of herbicides to control weeds at the base of
obstacles to grass cutting in open spaces (e.g. benches, signs, street
name signs, lamp posts, litter/dog bins, drain covers etc.) and
tolerate/accept weeds and longer grass/vegetation at these locations
(excluding fence lines or base of walls where treatment is recommended
to continue to protect infrastructure, and excluding cemeteries and war
memorials were control is also recommended to continue). 
• Grass Edges: reduce use of herbicide around grass plots and limit use
only to where grass cutting equipment cannot access. 
Page 138

Page 139

and continue to reduce the use of Glyphosate by: 
• Shrub Beds: continuing to mulch shrub beds with bark chippings from tree
related works to supress weeds where and when resources allow (this
practice is currently used to limit our use of Glyphosate). 
• Wildflower areas / areas of relaxed grass cutting:  avoiding applications of
herbicide in the vicinity of these areas to allow native flowers, grasses and
‘weeds’ to thrive to support pollinators, and tolerate/accept weeds and
longer grass/vegetation in the surrounding areas. 
• Limiting use:  through continued targeted treatment 
• Strimming: to continue to carry out strimming operations in open spaces
to manage weeds and longer vegetation, including around grass cutting
obstacles, noting that resources for strimming are limited as previous
budget savings have reduced staffing resources for strimming works and
that the frequency of this task is now on average bi-monthly.   
7.   SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Enhancing biodiversity delivers a wide range of social and environmental
benefits that will support corporate and community planning objectives. 
Environment – looking after the world we live in to protect it for the
future. We want to encourage everyone to take small steps to preserve
and protect our environment as we go about our daily activities. 
(b) Policy and Legal
The Council’s Open Space Strategy aims to ensure public open spaces
in Moray are of sufficient quality and distribution to meet the needs of
local communities and local biodiversity.   
There are no direct legal implications.  Glyphosate is currently legally
approved for use in Great Britain. 
(c) Financial implications
The use of Glyphosate to control weeds in open spaces is currently
considered to be the most cost effective and efficient means of control. 
Alternatives methods are currently more expensive and would require
additional revenue and capital expenditure.  However, the approach
contained within this report and outlined at paragraph 6.3 does not
require any additional revenue or capital investments. 
(d) Risk Implications
Given increasing public concerns over the use of Glyphosate to control
weeds in open spaces there is a potential reputational risk to not
considering an approach to reducing its use. 
Page 139

Page 140

There is a risk that a reduction in environmental standards results in an
increase in customer dissatisfaction and complaints about a reduced
standard of grounds maintenance, including at locations where
communities are actively involved in looking after the appearance of their
local environment.   
There is a risk that the Council cannot identify a viable or affordable
alternative to Glyphosate in the next few years but Officers will continue
to monitor the cost and effectiveness of alternative approaches.   
There is a risk of damage to infrastructure and public safety through
tripping hazards or irritation without an effective weed control programme
in place.     
(e) Staffing Implications
The recommendations contained within this report can be contained
within existing staffing resources. 
There is no available staff capacity or budgets to adopt alternative
methods of control which are more costly and labour intensive to provide
which require an increase in the number of treatments or controls.   
(f) Property
The approach is likely to  affect the visual appearance of our open
spaces due to a greater presence of weeds and longer vegetation in the
environment however controls around fixed infrastructure and buildings
would continue at current service standards to avoid help reduce
damage to infrastructure. 
(g) Equalities/Socio Economic Impact
The proposals could support increasing biodiversity and contribute to
community health and wellbeing by reducing inequalities of access to
nature. 
(h) Climate Change and Biodiversity Impacts
The proposals will support mitigation of, and adaptation to, the climate
and biodiversity crisis. The Council has recognised the biodiversity crisis
through the Climate Change Strategy and its support of the Edinburgh
Declaration on Biodiversity. The negative impact of glyphosate is
particularly relevant to pollinators, especially bees, which are under a
number of growing pressures and the resulting pollinator decline will
have risks to human food systems. Therefore, attempts to reduce the
use of glyphosate should be supported. 
(i) Consultations 
Depute Chief Executive (Economy, Environment and Finance), Head of
Economic Growth and Development, Legal Services Manager, Head of
Environmental and Commercial Services, Head of Financial Services,
Head of Housing and Property, Open Space Operations Officer, Roads
Maintenance Manager, Sport & Culture Service Manager, Principal
Climate Change Strategy Officer, Strategic Planning & Development
Manager, L Rowan (Committee Services Officer) and Equal
Page 140

Page 141

Opportunities Officer have been consulted and comments received have
been incorporated into the report. 
8.      CONCLUSION 
8.1 Glyphosate is a legally approved effective herbicide used to manage and
control a range of weeds in open spaces.  Unlike many other herbicides,
Glyphosate’s systemic action kills the roots of weeds making it one of
the most widely used, cost effective tools for managing weeds in the
environment 
8.2 Many local authorities in Scotland continue to use Glyphosate for weed
control with some having reduced use and trialled alternative control
methods. 
8.3 Alternative methods of control are not currently as effective as
Glyphosate and would require an increase in both revenue and capital
expenditure to meet the increased costs of materials, labour, fleet and
fuel to maintain current levels of weed control, each with their own
positive and negative features.   
8.4 An approach to reduce the Council’s use of glyphosate is set out in
paragraph 6.3 and could be introduced without the need for additional
capital or revenue resources but given the reduction in grounds
maintenance standards this would require a greater presence of weeds /
longer vegetation to be accepted in our environment. 
8.5 Given the lack of a cost effective or efficacious alternative there is a
need to continue to monitor trials of alternative approaches being
undertaken by others.   
Author of Report: James Hunter, Open Spaces Manager 
Background Papers: Minute of the Meeting of the Economic Development and
Infrastructure Services Committee, Tuesday 21st June
2022 (Item 6 - Written Questions and Response). 
Ref: SPMAN-524642768-838 
Page 141

Page 142

Page 142

Page 143

APPENDIX 1
Alternative Methods of Weed Control
Method Positives Negatives
Manual Removal –
removal of weeds by
hand or handheld tools
or machinery e.g. weed
rippers
Effective method within
instantly visible result 
Targeted approach 
Labour intensive - a significant
investment in additional staffing
resources required if this method was
to be adopted 
Potential hand arm vibration issues for
staff 
Costly 
Time consuming 
Unlikely to remove roots resulting in
quick plant re-establishment 
Requires ongoing and repeated
treatment throughout the year 
Carbon footprint increase when petrol
engines are used 
May damage tarmac surfaces
especially if they are in poor condition 
Increase noise levels for public and
operators where petrol driven
machinery is used 
Can deplete soil volumes when roots
are removed (particularly noticeable in
plantings and around headstones) 
Foam - a non-chemical
weed control system -
combines heat with
biodegradable foam
which acts as a thermal
blanket to insulate hot
water 
Non chemical control
system 
More effective than hot
water – thermal blanket
retains heat in kill zone 
Fewer treatments required
when compared to hot
water and steam 
Has multiple uses e.g. can
be used to clean
equipment in addition to
weed control 
Can be used in all weather
conditions
Increased CO2 output when
compared to herbicide application on
foot (vehicle and fuel required) 
Slow method of treatment 
Less effective control on perennial
and woody weed species 
Potential access issues – equipment
cannot easily access all areas where
weeds are controlled and may be
inaccessible to some 
Suitable for a limited number of
settings only given restrictions on
equipment accessing all areas 
Item 11
Page 143

Page 144

Reports from trials by others that staff
find the equipment unwieldy 
Transportation of water required 
Significant capital investment in
machinery required and a significant
increase in staffing to operate and
completed the recommended 3
applications required by year 
Thermal – control
method using wet heat
such as steam, hot
water 
Non chemical control
method 
Plants dehydrate and die
within a few hours or days 
Wet heat quickly lost to the
atmosphere (weather limited) which
can reduce effectiveness 
Requires multiple applications
throughout the year (due to little effect
on root structure and quick re-growth) 
Requires vehicle and fuel 
Suitable for a limited number of
settings only given restrictions on
equipment accessing all areas 
Potentially slow and limited to water
capacity 
Capital investment and additional
staff, vehicle and fuel resources would
be required 
Health and safety issues relating to
high heat and potential burns if not
used correctly/safely 
Flame – use of flames
to destroy vegetative
matter using propane-
fuelled flames, control
delivered by passing an
open flame over the
weed
Non chemical means of
control 
Can be used all year
round. 
Heat burns vegetation only therefore
there is little impact on root structure 
Regrowth will soon follow control 
A significant number of treatments
required each season to achieve
effective control 
Risks to health and safety from naked
flame and through transportation and
storage 
Fire risk, including risks to
infrastructure 
Cannot be used near vehicles 
Can damage property/infrastructure
Page 144

Page 145

Additional staffing resources required
for this method of control 
Uses propane gas to fuel flame 
Electricity – method of
control using electrical
currents to destroy
plants 
Can provide effective
treatment 
Useful for spot weeding 
Time intensive treatment resulting
increased labour input and costs 
Regular manual adjustment of voltage
required to cater for size of weed 
Health & safety risks from incorrect
use 
Potential to initiate fire 
Recommended cordoning off areas
from public during treatments 
Cannot be used in wet conditions. 
Care needed around conductive items
such as fences, signs, gates etc 
Capital investment and additional staff
resources would be required 
Acetic Acid – control
using the active
ingredient found in
vinegar
Will kill most vegetation by
burning through leaves
and drawing moisture out. 
Effective within a few days
Effectiveness does not last long 
Must be handled with extreme care to
avoid risk of irritation 
Unpleasant smell 
Weather dependent (needs to be
applied in dry conditions) 
Cannot be used on soft surfaces like
soil or sand 
No effect on root system so repeated
treatments required and therefore
higher labour costs 
Additional staff would be required to
resource additional applications
needed 
Fatty Acids –
Pelargonic acid found
in plant and naturally
dries out weeds
Natural origin 
Fast acting – signs of
treatment within 2-3 hours 
Contact acting – not translocated so
does not kill roots 
(at least three times) More expensive
than Glyphosate with a much higher
Page 145

Page 146

Can be mixed with
residual herbicide
(flazasulfuron)
application rate – so more product
required 
More applications required (5 – 6)
each year to achieve effective weed
control 
Increased staffing and material
budgets required to resource greater
number of treatments required for
effective control 
Strimming –
mechanical, petrol
driven method to cut
grass / weeds around
perimeters, and to
control vegetation in
larger areas, around
difficult terrain or close
to obstacles
Effective for large areas of
vegetation 
Effective for difficult terrain 
Aesthetically more
pleasing – achieves a
tidier appearance 
Can be carried out all year
round 
Potential hand-arm vibration issues
for operators 
Carbon footprint increase from petrol
engines 
Labour intensive 
Equipment and servicing costs 
Increased risk of claims from flying
debris 
No effect on root structures so does
little to reduce re-growth 
Repeated treatments required 
Limited to certain weather conditions 
Supplementary tasks like blowing and
sweeping required to remove arisings 
Previous budget saving have already
reduced current strimming operations
from monthly to every two months
during the growing season 
Significant increase in staffing and
material budgets required to resource
greater number of operations required
for effective control 
Risks of damage to assets from
contact with strimmer wires 
Page 146

Page 147

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 7 FEBRUARY 2023 
SUBJECT: MORAY ROUTES: BRIGHT FUTURES 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To present to committee the Strategic Tourism Infrastructure Development
Plan, Moray Routes: Bright Futures and to seek permission to approve the
plan and its proposals. The final plan has been included as APPENDIX A. 
1.2 This report is submitted to committee in terms of Section III (F) (2) of the
Council's Scheme of Administration relating to the exercise of functions that
promote economic development. 
2. RECOMMENDATION 
2.1 It is recommended that , subject to the qualification at para 4.6 of the
report, committee approve the Moray Routes: Bright Futures plan and
authorise officers to prepare (subject to staffing capacity) subsequent
applications to future rounds of the Rural Tourism Infrastructure Fund,
once announced, to progress the Tier 1 and selected Tier 2 projects
referenced in the report. 
3. BACKGROUND 
3.1 At its meeting on 6 April 2022, Moray Council approved the acceptance of a
grant award of £31,500 from Visit Scotland’s Rural Tourism Infrastructure
Fund (RTIF) to create a Strategic Tourism Infrastructure Development Plan
(paragraph 16 on the minute refers). Public Authorities were encouraged by
Visit Scotland to submit an application for the preparation of a plan to identify
capital projects which would address existing or future tourism pressure
points. Only those authorities with plans approved by Visit Scotland will be
able to submit funding applications to future rounds of the RTIF. The plan
covers the Moray Council area, other than that which falls within the
Cairngorm National Park boundary, as the park authority has funding to
develop a separate plan. 
Item 12
Page 147

Page 148

3.2 A cross-section project team consisting of the Economic Growth and
Regeneration Manager, Open Space Access and Policy Officer, Sustainable
Travel Officer, and Senior Officer Economic Strategy and Development have
coordinated the project. Following the Council approval of the grant award, a
consultant was appointed to lead the preparation and writing of the strategic
infrastructure plan. 
3.3 Sustainable tourism is one of Scotland’s key growth sectors as identified in
the Scottish Government’s National Strategy for Economic Transformation. It
is also of importance to the Moray economy, generating significant economic
benefits across the region. Prior to the COVID-19 pandemic, the tourism
sector had seen consistent growth over a number of years, with the sector
responsible for generating over 10% of total employment in Moray by 2019.
The sector was then disproportionally affected by the pandemic due to the
restrictions on travel, however there are now signs of recovery. 
3.4 The STEAM Report for 2022, which analyses the impact of the tourism sector
at a local level, indicates that the sector generated over £96m for the Moray
economy in 2021. Though this remains below the 2019 peak of £134m.
Additionally, in 2021 the sector was responsible for supporting:
• 480k annual tourism visits
• 1.4m annual visitor days
• 2,173 jobs (full time equivalent) 
4. MORAY ROUTES: BRIGHT FUTURES 
4.1 It was agreed that the Moray Strategic Tourism Infrastructure Development
Plan would explore opportunities to enhance the six long distance walking/
active travel routes in rural Moray. This would be targeted towards delivery of
significant long term benefits to the visitor experience, positively impacting the
visitor economy and the local landscape, whilst also indirectly supporting the
Moray Council Active Travel Strategy. These ‘Moray Routes’ comprise the
network of key enabling walking and cycling leisure routes across Moray,
which includes:
• Moray Way
• Speyside Way
• Dava Way
• Moray Coastal Trail
• Rothes Way
• Isla Way 
4.2 The plan identifies key priorities in a package of measures for Moray Routes
infrastructure over the medium term, defined as being within the next 5 years.
The proposals included will support development of a network of routes that
welcome everyone who wants to walk, cycle and wheel, with improved
interpretation and infrastructure. This is targeted towards providing visitors
with opportunities to move through the landscape at their own pace,
increasing the number and duration of visitor stays, and spending more in
local economies. The plan creates a pipeline of potential projects for Moray to
reduce the pressures on communities through improving tourist infrastructure
and enhancing the visitor experience.
Page 148

Page 149

4.3 The plan aims to builds upon complementary recent projects including the
Speyside Low Carbon Hub, the Staycation project and RTIF funded Coast to
Country (phase 4), and the Lossiemouth East Beach Bridge replacement.
Together these projects have brought critical investment of £3.36 million to
the Moray Routes network. 
4.4 The vision of Moray Routes: Bright Futures is that by 2030, Moray Routes will
be seen as a vibrant, distinctive, and responsible network of trails valued for
their connectedness, ease of use, and warm welcome – alongside the
exceptional landscapes and outstanding heritage found in Moray. The trails
provide a year-round sustainable network for both tourism and active travel.
The trails will become increasingly connected by low carbon transport options,
creating economic and social value for local communities, supporting the
area’s transition to a low carbon economy. 
4.5 In addition to engagement with public bodies and strategic partners such as
Visit Moray Speyside and Cairngorm National Park Authority, key local
community organisations were consulted in the preparation of the plan, with
their views incorporated in into the final report. Those consulted include:
• Moray Way Association
• Speyside Way Association 
• Dava Way Association
• Drummuir 21 
• Findhorn Village Conservation Company
• Rothes Way Association 
• Tomintoul & Glenlivet Development Trust
• Dufftown & District Community Association
• Portgordon Community Trust
• Glenlivet & Inveravon Community Association
• Dufftown & District Community Council 
• Glenlivet Community Council 
4.6 There is little maintenance budget for the core path network at present.
However, the Dorenell Wind Farm community benefit fund provides an annual
payment of £50k towards the core path network, over a period of 25 years.
The Access Manager is currently developing an Action Plan for prioritisation
of these funds to improve and manage the core path network, which will be
reported later this year. These proposals for the wider network will include the
Moray Routes and therefore implementation of any work on these routes will
need to be co-ordinated with RTIF opportunities. In light of this, it is not
proposed to progress with creation of a restricted fund, as is suggested in the
plan, at this time. 
5. PROJECT PROPOSALS 
5.1 The consultants responsible for preparing the plan reviewed all 6 Moray
Routes and developed an initial long list of 26 potential projects. This list was
then reduced a final shortlist of 11 projects, based on site assessment,
evidence from relevant studies, and stakeholder engagement. A workshop
was then held with the project team to score these projects against fit with
RTIF criteria and deliverability. From this, a final list of 8 projects were agreed,
Page 149

Page 150

including two strategic ‘Tier 1’ projects, and a further six ‘Tier 2’ projects which
cover specific sections of the Moray Routes. These are projects that all fit with
the criteria of the RTIF, demonstrate gaps in provision across the Moray
Routes, and align with local strategy and the aspirations of communities. The
projects are summarised in the table below and detailed in full in the
accompanying plan. 
Tier 1 Projects 
Project  Estimated
Capital Cost 
Description
1. Smart Destination  £102,450 -
£111,450 
This strategic project proposes to develop
the use of sensors to generate real time user
data to inform future maintenance and
investment decisions, alongside creation of a
visitor app to assist with the generation of
data, while providing mapping, route
information, and improving the quality of
visitor stays.
2. Informed Destination  £87,000 The second strategic project identifies the
need for installation of 17 interpretation hubs
at key points around the Moray Routes
network, to improve interpretation and
provide visitor information.
Total Value Tier 1  £189,450 -
£198,450 
Tier 2 Projects 
Project Indicative
Capital 
Cost
Additional Notes
3. Access for All £73,500 Project in Findhorn on the Moray Coastal
Trail. This would develop an all abilities path
and viewing platform at the beach to alleviate
current issues with access to the landscape
for people with restricted mobility. 
4. Venture up the Hill £246,000 Project on Tomintoul Spur of the Speyside
Way. The project will improve the safety and
visitor experience of the route, as it crosses
and travels alongside roads, as well as the
construction of a new viewpoint in the vicinity
of the summit of Cairnacay.
5. Link to the Trails £450,000 Project on Dufftown Spur of the Speyside
Way. The proposed works will seek to secure
existing land slips and provide a safe route,
alongside maintenance of the Fiddich and
Newton bridges, with enhancements to
existing path surfaces.
6. Distilleries Trail £72,000 -
£79,500
Project on Rothes Way Spur of the Speyside
Way. The proposals are to provide support in
the creation of the Rothes Way, as a new
multi-use route that the community of Rothes
is seeking to establish, linking Rothes with
Craigellachie and the established Speyside
Way.
7. Historic Connections £112,500 Project at Dallas Dhu on the Dava Way. This
project proposes to create an all abilities
Page 150

Page 151

access path onto the Dava Way from Dallas
Dhu to enhance the experience for visitors
and people living in the communities in the
nearby new housing developments.
8. Coastal Connections £187,500 Project at Spey Bay on the Moray Coastal
Trail. Proposals will deliver route
enhancements and improve the signage of
this unique section of the Moray Routes,
which combines the Moray Coastal Trail and
Speyside Way. This will provide a link via the
old railway line to Portgordon and beyond to
Buckie, 
Total Value Tier 2  £1,141,500 -
£1,148,500 
6. RURAL TOURISM INFRASTRUCTURE FUND ROUND 5 
6.1 The next application deadline for RTIF Round 5 is 18th January 2023, which
predates the meeting of this committee. However, Visit Scotland are exploring
a change to the application process, which would result in RTIF changing to a
rolling programme for applications, with 2/3 funding panels per year. However,
this is still to be confirmed. 
6.2 For projects which require further detailed design work, legal issues, or
require planning, it is possible to apply to RTIF for a design grant of up to
£20k at any time. If further planning or design is not required then authorities
are able to progress directly to the next funding round. RTIF will fund up to
75% of eligible project costs for projects that form part of the delivery of a
priority identified within a Strategic Tourism Infrastructure Development Plan. 
6.3 The funding criteria for the RTIF is detailed below:
• 1 Responsible tourism and a carbon conscious approach
• 2 Addressing pressure points
• 3 Meeting strategic needs and gaps
• 4 Improving the visitor experience
• 5 Bolstering community capacity
• 6 Emphasis on deliverability and viability 
6.4 To support the further development of funding bids and delivery of future
projects, it is proposed that a project board be formed, consisting of officers
from Strategic Planning and Development, Economic Growth and
Regeneration, Open Spaces, and Consultancy. Project management resource
will be built into any bids to subsequent rounds of RTIF. 
7. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The proposal will contribute to achieving the corporate plan priority to
promote economic development and growth, also the LOIP priority of a
growing and sustainable economy. 
Page 151

Page 152

(b) Policy and Legal
The Council considers support for economic development issues on their
individual merit, against the objective to facilitate sustainable economic
growth and the desired outcomes of the Local Outcome Improvement
Plan, Corporate Plan, and Moray Economic Strategy 2022-2031. 
(c) Financial implications
Funding for the creation of the Strategic Tourism Infrastructure
Development Plan was provided via £31,500 from RTIF, £3,500 from
Highlands and Islands Enterprise, and £4,850 from Economic Growth
and Regeneration via Business Gateway. 
The total costs of the 8 projects prioritised within the Moray Routes plan
equate to an estimated £1.347m. Delivery of all 8 projects would require
match funding in the region of £337k. However, these projects will only
be delivered subject to accessing the required match funding from
external sources and securing the project management resource. 
Possible sources of match funding for future projects include:
• Coastal Communities Fund
• UK Shared Prosperity Fund
• Just Transition Fund 
There is little maintenance budget for the core path network at present.
However, the Dorenell Wind Farm community benefit fund provides an
annual payment of £50k towards the core path network, over a period of
25 years. The Access Manager is currently developing a strategy for use
of these funds to support the core path network, which will be reported
later this year. Any proposals for the wider network will include the Moray
Routes. 
(d) Risk Implications
The COVID-19 pandemic has resulted in unprecedented visitor demand,
placing increased pressures on fragile infrastructure, while also
highlighting the enormous potential of Moray’s tourism sector. The Moray
Routes: Bright Futures plan, and subsequent RTIF funding rounds,
present an opportunity to mitigate these pressures and grasp the
opportunity to enhance the local visitor experience and develop Moray’s
tourism economy. The risk is to do nothing, thereby seeing further
deterioration of existing infrastructure and potentially losing out on
increased tourism while other areas benefit. 
(e) Staffing Implications
A cross-section working group consisting of officers from Strategic
Planning and Development, Environmental Protection, Transportation,
and Economic Growth and Regeneration have coordinated the
development of the plan. 
As detailed in this report, a project board consisting of officers from
Strategic Planning and Development, Economic Growth and
Regeneration, Open Spaces, and Consultancy will be formed. This will
share resource across teams and spread the load associated with the
development of funding bids, delivery of projects, and ongoing
Page 152

Page 153

maintenance requirements. Future applications to RTIF will also have
project management resource built into the costs to ensure this is not an
burden on Council resources. Projects will only be delivered subject to
accessing sufficient funding, securing project management resource and
where existing staffing capacity allows. 
(f) Property
There are no property issues arising directly from this report. However,
subsequent applications to RTIF will seek to make improvements to core
path infrastructure, some of which is owned by the Council. 
(g) Equalities/Socio Economic Impact
The strategic infrastructure plan will enable long-term economic
investment across Moray, for the benefit of local communities from a
leisure perspective and in developing local tourist economies. An
equality impact assessment will be carried out throughout the
implementation of the plan in order to ensure that the benefits are shared
across the characteristics protected under the Equality Act 2010. 
(h) Climate Change and Biodiversity Impacts
The proposals included in the Moray Routes: Bright Futures plan aim to
promote multi use routes and active travel infrastructure improvements
that make the strategic routes easier to use for cyclists and pedestrians,
providing a viable alternative to motorised transport and helping to
encourage modal shift to reduce the carbon footprint of local transport
and tourism activity. The development plan is aligned with the proposals
included in the Moray Council Active Travel Strategy. 
A ‘repair over replace’ approach has been proposed for current
infrastructure where possible, helping to conserve embodied energy and
reduce resources. Careful selection of robust and durable natural
materials and where practical, use of recycled materials will be prioritised
in delivery of subsequent projects. Where possible, path furniture will
incorporate biodegradable or recycled materials, and all wood products
will be sourced from accredited sustainable forests. Project designs will
consider measures to reduce ongoing maintenance burdens as much as
is practically possible to protect resources. 
Projects will maximise opportunities to promote and enhance biodiversity
through control of invasive species and increased awareness raising of
sensitive local ecosystems. 
(i) Consultations
Depute Chief Executive (Economy, Environment and Finance), the Head
of Economic Growth and Development, the Chief Financial Officer, the
Economic Growth and Regeneration Manager, the Open Spaces
Manager, the Principal Climate Change Officer, the Open Space Access
and Policy Officer, the Sustainable Travel Officer, the Equal
Opportunities Officer and Lissa Rowan (Committee Services Officer)
have been consulted and comments received have been incorporated
into the report. 
Page 153

Page 154

7. CONCLUSION 
7.1 The Moray Routes: Bright Futures plan provides a strategic vision for
improving and developing some of the most valuable tourism resources
in the region. The growth in the Moray tourist economy and interest in
sustainable tourism more generally, provides an opportunity to
stimulate local economic activity, support the sector, and improve
infrastructure used and enjoyed by local communities as well as
visitors. 
7.2 The Rural Tourism Infrastructure Fund provides an opportunity to fund
two key strategic projects, which would both enhance the experience of
visitors to Moray, and provide valuable data to support future
development of the Moray Routes. While improvements to sections of
the routes via the six further place based infrastructure projects will
enhance and develop key elements of the long distance path network in
all corners of Moray. 
7.3 Approval of the Strategic Tourism Infrastructure Development Plan and
the proposals outlined for the development and implementation of the
next phase of these projects is key to allowing this work to progress. 
Author of Report: Chris Muir, Senior Officer Economic Strategy and
Development 
Background Papers: 
Ref:
http://spman.moray.gov.uk/MANComRepDraftSite/_layout
s/15/DocIdRedir.aspx?ID=SPMAN-813460984-327
Page 154

Page 155

1 
Item 12
Page 155

Page 156

2 
Moray Routes: Bright Futures – Strategic Infrastructure Plan
Unlocking the Power of Moray Routes  
Page 156

Page 157

3 
Acknowledgements
Thanks to the team that worked with WMG Consultancy Ltd on this Plan – Duncan Bryden
Associates and Athena Solutions.
Grateful thanks to all the many local community representatives, partners, landowners, and
other stakeholders who gave of their time freely and were instrumental in capturing local
and strategic details within the Plan. Thanks also to those that completed our questionnaire
on the draft Plan.
Thanks to Moray Council staff team who also were patient and tireless in dealing with the
many enquiries we put their way. 
Table of Contents
Chapter
Section
Title Page 
PART 1 – MAIN PLAN 5-42
1 Plan Context and Definitions 5-6
2 Conclusions and Recommendations 7
2.1 Conclusions 7
2.2 Recommendations 8
3 Engagement and Consultation with Key Stakeholders 9-10
3.1 Key Stakeholders and Community Groups 9
3.2 Engagement and Consultation 10
4 Vision and Objectives 11-12
4.1 Vision 11
4.2 Objectives 11
5 Plan Methodology 13-16
5.1 Commissioning and Analysis 13
5.2 Data Sources 13
5.3 Moray Plans and Strategies 13
5.4 National Legislation and Strategies 14
5.5 Moray Route Reports 14
5.6 Carbon Conscious 14
5.7 Previous Investment 14
5.8 Investment Outcomes 15
6 Moray Routes – Opportunities and Challenges 17-19
6.1 Opportunities 17
6.2 Challenges 17
6.3 SWOT Analysis 18
7 Moray Routes – Infrastructure Audit 20-23
7.1 Summary 20
7.2 Legal Basis for Core Infrastructure 20
7.3 Physical Infrastructure 21
7.4 Digital Infrastructure 22
Page 157

Page 158

4 
8 Overarching Principles of Infrastructure 24-28
8.1 Pipeline of Solutions 24
8.2 Existing Counter Network 27
9 Moray Routes Users 29-34
9.1 User Characteristics 29
9.2 Walking Visitors in Scotland 29
9.3 Cycling Visitors in Scotland 29
9.4 Visitors to Moray 30
9.5 Walking and Cycling Visitors to Moray 30
9.6 Route Popularity Comparisons 31
9.7 Trip Advisor Reviews 32
9.8 Carbon Implications of Cycling and Walking 33
9.9 Moray Routes Market Trends and Drivers 33
10 Moray Routes Infrastructure Condition and Management 35-39
10.1 Physical Route Management 35
10.2 Rails to Trails Sections 36
10.3 Hill Path Sections 37
10.4 Coastal Trail Sections 37
10.5 Route Infrastructure Summary 38
10.6  Route Stewardship Summary  38
11 Funding Sources 40-42
11.1 Known Funding Sources 40
11.2 Moray Routes Infrastructure Fund 41 
PART 2 – PROJECT OUTCOMES 43-81
12 Costs and Details 43
12.1 Summary of Indicative Capital Costs  43
12.2 Tier 1 Projects in Detail: 44-53
Project 1: Smart Destination – Sensors (Counters) and App 44-49
Project 2: Informed Destination – Interpretive Hubs 50-53
12.3 Tier 2 Projects in Detail: 54-81
Project 3: Access for All - Findhorn 54-58
Project 4: Venture up the Hill – Tomintoul Spur 59-63
Project 5: Link to the Trails – Dufftown Spur 64-68
Project 6: Distilleries Trail – Rothes Way 69-73
Project 7: Historic Connections – Dallas Dhu 74-76
Project 8: Coastal Connections – Spey Bay to Portgordon 77-81
13 Appendices 82-84
13.1 Appendix1: Stakeholder Engagement Questionnaire on the
draft Plan
82
13.2 Appendix 2: Current Locations of Counters and Existing
Information
84
Page 158

Page 159

5 
PART 1 – MAIN PLAN
1 Plan Context 
This plan identifies key priorities in a package of measures for Moray Routes infrastructure 
over the medium term - broadly defined as being the next 2 - 5 years. Walking, wheeling, and
cycling are at the top of Scotland’s sustainable transport hierarchy. Moray Routes comprise
the network of key enabling walking and cycling leisure routes across Moray. Equally, the
descent of the River Spey through Moray is a popular canoe journey.  
Well used by visitors and people on day trips, the network makes a big contribution to the
Moray tourism offer and generates significant economic, well-being and environmental
benefits. Investment in route infrastructure means more can be done to increase these
benefits and to make the routes accessible to a wider range of users. Challenges come from
increasing user numbers and demands in the context of Moray’s topography, ageing
underlying infrastructure and the pressures of climate change effects. Almost 30% of Moray
routes are on disused railway infrastructure built over 100 years ago, including key bridges
across large rivers like the Spey. 
To get through the recent Covid-19  pandemic, many people came to appreciate the scenic
assets and paths close to home that we depend upon for both our mental and physical health.
Counters on Moray Routes show increases in path usage both by cyclists and walkers.
Overseas visitors stayed away during the pandemic and, although they are making a welcome
return to Moray, an outlook is needed to fully capitalise on ‘staycations’ and day trip users,
at least for the foreseeable future. Prioritising active travel needs heightens the importance
of having good local multi-use  infrastructure, transport hubs and destinations with facilities
in place suitable for day-to-day travel and tourism-related travel. 
Moray needs a network of routes that welcomes everyone who wants to walk, cycle and
wheel and that gives people ways to move through the landscape at a leisurely pace, staying
longer and spending more in local economies while improving their health. Moray Council has
prioritised active travel when developing and maintaining connected travel routes. However,
this cannot be achieved without significant and sustained investment in local routes
infrastructure.
This strategic infrastructure plan builds on this growing need. It also  builds on complementary  
schemes like the Tomintoul and Glenlivet Landscape Partnership - Access Improvements, the
Coast to Country project, the Speyside Low Carbon Hub Project, and the Lossiemouth East
Beach Bridge replacement (details below). Together they have already recently invested
£3.36 million in parts of the Moray Routes network. 
Page 159

Page 160

6 
Definitions 
Active Travel:  Refers to modes of travel that involve a level of activity like walking, cycling,
and wheeling. During Covid, average miles walked and cycled increased to their highest
recorded levels.  
Infrastructure: Physical and digital infrastructure used by visitors and by Moray residents in
their day-to-day activities. Defining “tourism infrastructure” is not always easy. This plan is for
physical and digital infrastructure that is publicly available and typically provided by a public
or third sector body  as  part of a nationally defined Long Distance Route network - primarily
aimed at visitors. 
Jobs: Employment supported by visitor spending in the community because of the routes. Part-
time and seasonal jobs are included proportionally. A person can hold more than one job, so
total job count is not necessarily the same as the count of employed persons. 
The Moray Routes – Bright Futures Strategic Infrastructure Plan 2022: A rebranded name is
proposed for this Plan. The name is intended to convey a positive outlook for the network and
to deliver a memorable name for a Plan that will stand out amongst other plans and strategic
documents.  The term ‘Plan’ has been used in this document. 
Trips: The number of times someone travels in one direction along the route. A “point to point”
excursion along the route counts as one trip; an “out and back” walk or cycle  counts as two
trips. Route counters record trips, not users.
Users: The number of people who use the route. On average, users equal a little more than
half of trips. 
Visitors: Day trips - users who come from at least 50 miles away to use the route. Tourists –
users who are staying overnight in accommodation in or near to Moray . The number of visitors
underpins the estimates of spending and economic impact.
Visitor Spending: The amount of money visitors spend during their visit to the routes. This
spending represents ‘new’ money brought into the locality by people whose motivation to visit
is significantly because of route offers and choice. 
Page 160

Page 161

7 
2 Conclusions and Recommendations
2.1 Conclusions
The Plan describes the existing status of Moray Routes and notes route condition, challenges
of historic infrastructure, and topographical/climate change-based challenges for route
sections on the coast and in the hills. 
However, the Plan highlights the real opportunities for Moray communities and the tourism
economy in developing the physical and digital infrastructures along the routes. 
These opportunities will unlock the potential to: 
(a) Strengthen previous financial investment by Moray Council and the Scottish
Government and, importantly, the social investment by multiple local community-
based associations and bodies along the route.
(b) Enable businesses and communities to capitalise on positive market trends, showing
people seeking out less visited destinations and enjoying outdoor and ‘slow’ tourism
activities throughout the year that deliver value for money and wellbeing benefits.   
(c) Support projects that improve the quality of the visitor experience in Moray in places
that have faced pressure on their infrastructure due to a rise in visitor numbers during
the Covid pandemic. 
(d) Support projects that improve the outdoor offer to the visitor in Moray in places that
currently have weak route infrastructure or have the capacity to accommodate
additional visitor numbers.  
(e) Provide a focus on infrastructure that is carbon conscious and can help to reduce
climate change impacts. 
The Plan highlights a pipeline of projects that  are expected to produce positive outcomes for
Moray Council through better data management and infrastructure condition, with
concomitant benefits for businesses, communities, and visitors. 
The Plan includes two short pieces of video footage – an introductory video to the Moray
Routes and video specific to the projects listed. These can be accessed by permission of Moray
Council. 
Out with the context of this Plan, further packages of support, such as development officer
funding and marketing assistance made available to community-led bodies and small
businesses connected to Moray Routes, would enable them to better service the network and
the visitor experience.   
Successful applications to RTIF Round 5 for development support following the submission of
the Moray Routes Strategic Infrastructure Plan, will provide funding for detailed project
development so there will be minimal resource implications for Moray Council at this stage.
Projects that are selected for RTIF5 capital funding will then require additional matching
support from Council funds and/ or through applying for other grants or contributions. 
Page 161

Page 162

8 
2.2 Recommendations
It is recommended that:
1. Moray Council uses this Plan and the detail it provides to support the
submission of the projects set out in Part 2 of this report to RTIF Round 5;
2. The two Tier 1 Moray-wide projects (Smart Destination and Informed
Destination) be included in the first submission to RTIF Round 5; and
3. Moray Council considers the establishment of a new restricted Moray Routes
Infrastructure Fund 
Page 162

Page 163

9 
3 Engagement and Consultation with Key Stakeholders
3.1 Key Stakeholders and Community Groups
Key to successful delivery of a clear and agreed set of outcomes was positive buy-in at key
stakeholder and community level. 
Key stakeholder and community groups included:
Local Government
Moray Council Roads; Access; GIS; Econ Dev’t; Funding
Highland Council Access 
Public Agencies
Cairngorms National
Park Authority
Access; Strategic Planning; Funding
Forestry & Land Scotland Access; Estates
*Transport Scotland  Area Management; Funding
Local Associations and Groups
*Moray Way Association Priorities; Planning; Management; Funding
Speyside Way
Association
Priorities; Planning; Management; Funding
*Dava Way Association Priorities; Planning; Management; Funding
Drummuir 21 Priorities; Planning; Management; Funding
*Findhorn Village
Conservation Company
Priorities; Planning, Management; Funding
*Rothes Way Association Priorities; Planning; Management; Funding
*Visit Moray Speyside Business Improvement District - Strategic
tourism priorities
*Tomintoul & Glenlivet
Development Trust
Access; Funding
Community Councils and Community Associations
*Dufftown & District
Community Association
Priorities; Planning; Management; Funding
*Portgordon Community
Trust
Priorities; Planning; Management; Funding
*Glenlivet & Inveravon
Community Association
Priorities; Planning; Management; Funding
Dufftown & District
Community Council
Currently not established
Glenlivet Community
Council
Currently not established
Landowners
*Ballindalloch Estate Access; Estate Management; Funding
*Crown Estate Scotland Access; Estate Management; Funding   
Page 163

Page 164

10 
3.2 Engagement and Consultation
Key staff within these groups were initially identified, followed by a series of communications,
meetings, and site visits. Some of the proposed projects in this plan required multiple follow
up meetings and site visits to ensure the final proposals were achievable and deliverable. 
12* of these partners agreed to review the near final report and were each asked to respond
to a questionnaire (Appendix 1). Many of their comments or suggestions have been
incorporated into the final report, with several examples listed below:
 “Very comprehensive document. Working together to make improvements across
Moray to support residents, visitors, and businesses – well done.
 The Dufftown spur is used on a constant basis season-round, by runners, dog walkers,
distillery tour walkers, cyclists, young families, and as the route with some potential
risk of closure, issues should be among the first addressed.
 Although tourism is the key driver here, local physical and mental health aspects could
become a joined up “prescription” policy with local GPs and other care givers.
 We recognise that the plan is focussed on capital projects eligible for RTIF.
Nevertheless, an acknowledgement that any physical capital investment could be
greatly enhanced by revenue funding for community organisations supporting the
routes would be appreciated.
 A comprehensive and well researched plan that captures the current state of
infrastructure and the required works to make Moray a more attractive active tourism
area and improve active travel routes for locals and visitors alike.
 The MWA is supportive of the ground work suggested in the proposal and would be
happy to be a delivery agent but would need reassurance that better collaborative
working will be put in place.
 As is noted in the report, the digital infrastructure currently in place has limitations.
The Moray Ways Website has a great deal of potential for development. However, as
with community tourism development, capacity of the voluntary organisation running
the website is limited.
 Moray Council has major constraints on its budget and there would need to be
significant funding made available from the Scottish Government or other funding
bodies to meet the costs involved in planning, construction, and maintenance of paths
and other infrastructure aspects.
 Access to phone signals in rural areas will need to be improved to make this data
network work consistently.
 Providing more accessible routes with destinations is a positive outcome for all.
 The MWA have been looking at options such as digital passports and have developed
a sound walk for the Moray Way. These ideas could be developed to complement the
proposed app - but there has been no discussion with MWA about this in developing
the proposal.
 Overall, I find it an ambitious and exciting project which has the potential to provide
a major boost to tourism across Moray and positive benefit to rural communities such
as Rothes”.
Page 164

Page 165

11 
4  Vision and Objectives 
Making safe, high quality and connected environments for people walking and cycling
requires an infrastructure plan that sets out a strategic rationale for a pipeline of projects. It
helps to justify a further uplift in the amount of funding available in Moray to support walking,
cycling, and wheeling by day visitors and tourists.
4.1 Moray Routes – Bright Futures Strategic Infrastructure Plan 2022 – Vision
By 2030, Moray Routes will be seen as a vibrant, distinctive, and responsible network of
trails valued for their connectedness, ease of use, and warm welcome alongside the
natural beauty, wildlife, exceptional coastline, landscapes, and outstanding heritage
found in Moray. The trails provide a year-round sustainable network for both tourism and
active travel, where adjacent businesses are growing and embed walking, cycling, and
wheeling best practice in their operation. Trails are  increasingly connected by  low carbon
transport options and are creating economic and social value for Moray citizens and
supporting the area’s transition to a low carbon economy. 
4.2 Moray Routes – Bright Futures Strategic Infrastructure Plan 2022 – Objectives
The primary financial input sought  to support the three Plan objectives is from RTIF Round 5,
alongside contributions  from Moray Council’s capital budget plus other funding sources. This
is subject to Moray Council budget settlements and committee approvals. Moray Council staff
will provide oversight and expertise.  Project management time and effort will be provided by
voluntary associations and community companies where they have capacity. 
Objective 1 To bolster investment in Moray Routes infrastructure improvements
Output - Physical improvements to sections with poor quality and
accessibility 
- Improvement to digital management infrastructure and visitor
experience through automated counters, Apps, QR codes etc 
- Complement existing investment (car parks, toilets, EV chargers
etc) to further enhance user experiences    
Outcome Increased usage, greater user satisfaction with route quality, reported
improved perceptions of safety and user experience. 
Impact  More spend per visitor, longer stays, more diverse businesses supported,
enhanced profile/motivation for Moray as a walking and cycling
destination. More efficient maintenance and targeting of management
resources to address ‘bottlenecks’ and pressured sites. 
Page 165

Page 166

12 
Objective 2 To enhance the Moray Routes user experience
Output - Information to inform and prepare people for enjoyable but
responsible and sensitive  route use
- Physical and digital interpretation which expresses identity,
authenticity and localism of communities and places along the
routes
Outcome Information supplied to users is more relevant and helpful. Greater user
satisfaction with route user experience. 
Impact  Positive user generated route reviews. Users are inspired to return and
recommend their experience to others  
Objective 3 To strengthen shared stewardship of the Moray Routes
Output - Support and strengthen volunteer associations who work on the
routes
- Encourage community entrepreneurship and civic pride 
Outcome Better and more sustainable route management and maintenance 
Impact  More users and more new business opportunities. Businesses on or near
routes  report positive feedback and revenues1. More local ‘ownership’ of
routes as elements within Community Action Plans,  Local Place Plans and
Community Wealth portfolios 
1 Scotland’s National Walking and Cycling Network 2019 Evaluation Report Section 3.2 Scotland?s National
Walking and Cycling Network, 2019 Evaluation Report (walkipedia.scot)
Page 166

Page 167

13 
5 Plan Methodology 
5.1 Commissioning and Analysis
The Plan was commissioned by Moray Council to support a Moray Council RTIF Round 5
2022/23  application to support priorities over the medium term (2 - 5 years).  The analysis  is
based on desk top research,  field work on site,  and consultations with key stakeholders 
carried out from June to October 2022.
Analysis relies on  four data elements: 
1. existing route count data
2. past route reports, studies, and user characteristics
3. a literature review of comparable metrics for impacts associated with walkers, cyclists,
and other trails 
4. economic impact estimates from Moray STEAM and other tourism sector sources. 
The conclusions and identified projects in the report rely on three underlying assumptions: 
First, we assume that communities will capitalise on the benefits arising from the Moray
Routes, mainly through user spending,  with  local way associations and community
companies continuing to carry out supporting activities and  local businesses beside the
routes promoting themselves as welcoming stops for route users. 
Second, we assume that the increase in outdoor recreation and active travel observed during
the Covid-19 pandemic will persist. This assumption is supported by data from counters and
anecdotal accounts.  
Finally, we assume that the capital works highlighted in this Plan  will be built and maintained
to a satisfactory quality by Moray Council and other public body and third sector partners.
And we assume funding from other providers will continue to be sought, with a view to
establishing a long term type fund to support the network into the longer term.  
5.2 Data Sources 
The analysis  for the Plan also relies on information and priorities expressed in  past capital
project plans, previous Moray Routes reports and plans and the  recommendations from key
current published Moray and Scotland-wide legislation and strategies including:
5.3 Moray Plans and Strategies 
 Moray Council Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP)
 Moray Economic Strategy 2019-29 Towards Future Prosperity and Inclusive Growth
 Moray Growth Deal 2030
 Moray Speyside Tourism Strategy
 Moray Climate Change Strategy 2020-2030 and Route Map to Net Zero 
 Moray Local Development Plan 2020
 Moray Core Paths Plan – Amended 2018 
Page 167

Page 168

14 
5.4 National Legislation and Strategies 
 Countryside (Scotland) Act 1967 
 Scotland Outlook 2030 
 National Planning Framework 4 
 National Strategy for Economic Development 
 Place Principle2 
5.5 Moray Route Reports
 Moray Way Feasibility Study 2017
 Isla Way Extension Feasibility and Costing 2015
 Rothes To Craigellachie: Multi-Use Path Feasibility Study 2019
 Coastal Erosion Study, Findhorn to Roseisle 2002
 Lossiemouth to Hopeman Cycle Route Feasibility Study 2018
5.6 Carbon Conscious 
In assessing route infrastructure carbon implications, it is noted that the Scotland Climate
Change Plan and Act commits the country to becoming a net zero society by 2045 and the
Council have made a similar commitment for Moray.  
Architecture and Design Scotland (A&DS) helped Moray Council in 2019 with their Elgin spatial
plan to achieve this target in practical and creative ways3. The interconnected principles in
the report outline important concepts that are relevant to Moray Routes, especially where
they pass through tourism hubs where the principles are being applied. 
The eight A&DS principles are: 1. A place-led approach 2. A place of small distances 3. A
network of small-distance places 4. A place designed for and with local people 5. A place that
reuses, repurposes, and considers whole-life costs 6. A place with whole and circular
systems 7. A place that supports sharing 8. A place designed in time.
5.7 Previous Investment 
The Moray Routes network has seen recent infrastructure investment including:
5.7.1 Tomintoul and Glenlivet Landscape Partnership
Access Improvements where Tomintoul and Glenlivet Development Trust were awarded
National Heritage Lottery funding for a portfolio of projects including the Speyside Way Spur
path improvements. The project, costing £236,000 and opened in September 2019, involved
upgrading and repairing wet and muddy sections, improving path drainage and surfaces along
with formalising a long-standing diversion at Tombreckachie. Pedestrian self-closing gates,
and new signage have been installed. 
2 Place Principle: introduction - gov.scot (www.gov.scot)
3 The eight principles of a carbon conscious place | A&DS (ads.org.uk)
Page 168

Page 169

15 
5.7.2 Coast to Country Project 
Moray Council was awarded £346,065 from RTIF Round 4 in January 2022 for projects to
provide new overnight motorhome facilities in Cullen, Ballindalloch, and Craigellachie. Two
toilet blocks in Findhorn will be upgraded and reopened and a new toilet block will be installed
in Ballindalloch. 
A new car park and an upgraded foot path are to be implemented at Bow Fiddle Rock and Ben
Rinnes, Ballindalloch, Hopeman and Craigellachie will all receive car park enhancements. New
electric vehicle charging points will be installed at Craigellachie, Hopeman, Cullen, Bow Fiddle
Rock and Ballindalloch. All projects must be completed, and final claims received, by 31 March
2023.
5.7.3 Speyside Low Carbon Hub Project 
Moray Council secured £978,000 of funding from the European Regional Development Fund
(ERDF) Low Carbon Travel and Transport Challenge Fund, and Transport Scotland in 2018.
Phase One was 10km Craigellachie to Carron and Phase Two from Carron to Cragganmore.
Improvements included upgrading the existing surface, bridge repairs, improved drainage,
replacement of information panels, counters, open cycle storage and bike repair stations at
key nodal points and way markers charging points for ultra-low emission vehicles. These
projects are now complete.
5.7.4 Lossiemouth East Beach Bridge
Bridge replacement cost £1.8m and was funded by the Scottish Government and will be
maintained by Moray Council. It reopened in May 2022 and brings back a key link in the Moray
Coastal Trail. The business case submitted for Government funding revealed an annual loss of
£1.5m to the local economy when the original 100-year-old bridge was declared unsafe and
closed in 2019. The Lossiemouth Community Development Trust  estimate that approximately
75,000 people crossed the Bridge in July 2022 with a daily average of 2,400 crossings. 
5.8 Investment Outcomes
Investment of £3.36 million of public funds in route infrastructure from 2018 has delivered
real outcomes.  Since opening the Speyside Low Carbon Hub Project in 2019, average daily
cycling and walking figures have increased rapidly. In July 2019 an average of 6 cyclists a day
used the route, rising to 40 in July 2020. At Fiddich Park, Craigellachie, 67 walkers per day in
2019 became 183 in 2020. Aberlour is a significant tourism and employment centre for Moray
and hosts a secondary school with the largest geographic catchment in Scotland4.
Since opening in June 2022, the Lossiemouth Community Development Trust estimate that
approximately 75,000 people crossed the Lossiemouth East Beach  Bridge in July 2022 with a
daily average of 2,400 crossings. 
In addition to grant support over the last five years, it should be noted that the people
managing local trail associations have contributed hundreds of hours and many days of                                                           
4 file58279.pdf (moray.gov.uk)
Page 169

Page 170

16 
volunteer time and effort to projects to improve the Moray Routes network infrastructure.
This includes  practical repair works on the ground and in committee and fundraising work. 
Page 170

Page 171

17 
6  Moray Routes - Opportunities and Challenges
6.1 Opportunities 
Moray Routes are one of the most inspiring features of Moray and the area-wide network
takes people to many of its special places and promotes visitor expenditure. Along the routes
are ‘Instagrammable’ places like distilleries, castles, bridges, and villages beside natural
elements like rivers, coastlines, moors, hills, and forests. The routes are all part of the Scottish
National Walking, Cycling and Wheeling network.    
What truly makes the Moray Routes special are the community of users, local people and
businesses and associations that keep the spirit of the Moray Routes alive through their
adventures, their hospitality, their wayside stories, and their physical labour. 
Visit Scotland highlight the evidence around the fundamental need for outdoor activities – as
facilitated by Moray Routes. This has been a growing tourism driver for years and was further
strengthened during the pandemic. An increasing number of people are becoming more
active and looking for lower cost ways of staying healthy and physically fit. Technology,
closeness to nature and authentic experiences are core market drivers. 
There are 17 communities along the Moray Routes recognised in the Plan. These communities
are assets for everyone who uses the Moray Routes to walk, wheel, or ride. Many routes users
live in these communities and for visitors they provide food and drink, overnight
accommodation, transport links, attractions, history, volunteer opportunities and so much
more. Additionally, routes users can participate in special events and side adventures —
whether for a short time or for multiple days — and explore everything these route side
communities have to offer. The routes can be a catalyst for local community and business
developments, from providing route users with services like  food and drink, baggage transfer
and accommodation.  
6.2 Challenges 
Moray’s topography and  several major river catchments draining from Scotland’s highest
mountains and Moray Firth coastline  means major bridges and engineered sections are vital
routes network features. Sections of the network need additional investment to secure
connectivity, enhance user experience and deliver a lower carbon footprint for travel and
transport in Moray. Almost one third of the network follows disused railway lines, constructed
over 100 years ago, or even older routes. 
Many former rail structures are currently in use as valued active travel corridors across Moray
-  often as part of the Moray Routes network and the National Cycle Network. Moray Council,
Sustrans and others have ownership of a variety of assets, some are in use, and some are not.
Ensuring these and other structures remain fit for purpose requires regular structural
assessment and a pipeline of work on priority structures. 
Without funding to carry out capital works and to maintain these structures to an acceptable
level,  there is a very real risk to their future use – this applies both to those ones in use and
those that may be useful in the future. Climate change is accelerating the scale and likelihood
Page 171

Page 172

18 
of infrastructure damage through more frequent and intense weather events and sea level
rise. 
Around one fifth of the UK's population 5define themselves as disabled. This is expected to
grow due to the rising elderly population. Hence, making sections of the Moray Routes more
accessible to a wider range of users, without sacrificing core values of wildness and rurality is
important.    
Moray Council, working with partners, has begun to address other facility shortages and hot
spots along the routes by investment in toilets, carparking, and active travel sections.  Now
the Council  would like to further explore how improvements to path quality and accessibility 
and digital infrastructure like counters and Apps can be addressed. 
It should be recognised that, in many cases, targeted capital works to retain the network
‘status quo’  will cost less than infilling or removal of assets like old rail infrastructure  and will
prolong their life and the benefits they bring. Securing investment will enable the Moray
Routes network to meet user demands, enhance inclusion and to help Moray become a world
class sustainable visitor destination.
Beyond physical and digital infrastructure, challenges occur in the social and economic
infrastructure supporting the Moray Routes. Accommodation provision and public transport
lack connectivity with the route network. Volunteer community bodies associated with route
stewardship may lack resources such as funding and staffing to best capitalise on route
opportunities. 
RTIF is designed to support collaborative projects that focus on improving the visitor
experience in rural parts of Scotland that are facing immediate and damaging pressures on
their infrastructure or negative impacts on communities due to visitor numbers. Moray
Council and other economic development agencies, funders, and partners like Visit Moray
Speyside (a Tourism BID) operate a range of marketing, support, and resources to assist
businesses and community groups to take advantage of the Moray Route infrastructures.  
6.3 Moray Routes SWOT Analysis 
Strengths Weaknesses Opportunities Threats
 Accessibility
 Range of trails
 Links to
Cairngorms
National Park
 World class
whisky products/
destinations 
beside the trails   
 Seasonality
 Lack of suitable
accommodation
 Poor quality  trail
sections  - limiting
accessibility
 Lack of a clear
identity
 Developing
responsible 
outdoor adventure
and active travel 
product in Moray
 Wider all-ability
walking and cycling
network attracting
more users and
more spending
 ‘Red’ trail
sections
(engineering
challenges with
landslips, other 
capital works
and landowner
and land
manager                                                           
5 UK Government 
Page 172

Page 173

19 
 Varied product
along the trails
including
traditional
villages, coast and
country heritage
and wildlife
 Local trail
associations
taking
responsibility 
 Uncontrolled
crossing points on
major roads
 Waymarking
confusion for
users in places
 Lack of customer
data (modern
counters) and
trail condition
insight
 Use of taxis etc to
cross traffic heavy 
route sections 
 Undiscovered
hidden gems
attracting new
audiences 
 Enhanced 
associations with 
wildlife/ nature-
based tourism,
food, and drink
products to
diversify visitor
offer 
 Able and willing
local community
groups/
associations with
the skills to
develop, manage,
and maintain local
assets
 Enhanced
associations with
health and well-
being outcomes
from walking and
wheeling
resistance to
best trail lines) 
 Lack of
investment and
maintenance in
basic resources
like toilets and
cleaning 
 Lack of
distinctiveness
 Lack of public
transport links 
 Competitor trail
destination
investment
elsewhere in
Scotland 
Page 173

Page 174

20 
7 The Moray Routes Infrastructure Audit 
7.1 Summary
Routes infrastructure is physical and digital infrastructure that is publicly available and
typically provided by a public or third sector body  as  part of a nationally defined Long
Distance Route network primarily aimed at visitors. The Plan primarily addresses
infrastructure on the 250 km of Moray Routes that are, mostly, recognised as being part of 
Scotland’s  ‘Great Trails’6. 
7.2 Legal Basis for Core Infrastructure 
Long Distance Routes (LDRs) like the Speyside Way were established under Sections 39 and
40 of the Countryside (Scotland) Act 1967 by the Secretary of State  as “approved proposals
relating to a long-distance route”. Section 42 covers ‘variation of approved proposals’ and
requires a submission by the access authority  to Scottish Natural Heritage  (NatureScot)  who
should then prepare a report outlining their advice7 for decision by the relevant Scottish
Minister. 
Not all realignments of the four statutory LDRs have used the formal variation procedures as
set out in the Countryside (Scotland) Act 1967 if  proposals  could be regarded as de minimus.
However, Scottish Government recommends following the statutory procedures in cases
where  there could be resistance to the proposed changes. Access authorities may also opt to
use their Core Path procedures in some cases, such as road realignment.   
However, it should be noted that the routes are also part of:
1. Scotland’s National Walking Cycling and Wheeling Network (NWCWN) which
comprises Scotland’s Great Trails, the National Cycle Network and Scottish Canals
towpaths. Totalling 6,879km in length, these strategic routes are just part of the
estimated 84,000km of paths and trails in Scotland and 
2. The 482 km of paths that make up the Moray Core Paths Plan8. In turn, Core Paths are
part of an even more extensive network of formal and informal paths across Moray9. 
6 Discover Scotland’s finest long-distance trails, compare routes, find support services, maps and guidebooks -
Scotland's Great Trails (scotlandsgreattrails.com)
7  Guidance is contained in the Nature Scot Information Note:  Changes to long distance routes Version 2 -
2020
8 38265-core paths final 2011 (moray.gov.uk)
9 A Core Path can physically be any route – a right of way, farm track, an old drove road, a minor public road or
even a river. Land Reform (Scotland) Act 2003
Page 174

Page 175

21 
7.3 Physical Infrastructure 
MORAY
ROUTES
Start and finish  Length  Status 
Moray Way Circular  160km 
(100 miles)
Combines Moray section of
Speyside Way with Moray Coastal
Trail and Dava Way 
Speyside Way Moray Section to
Buckie and Spur to
Tomintoul 
80km (50
miles) 20km
(15.5 miles) 
Launched in 1981 and listed as a
Great Trail 
Sections improved for active
travel 
Dava Way Grantown to
Forres 
36.8km 
(23 miles )
Listed as a Great Trail
Regular local use in parts 
Moray
Coastal Trail
Findhorn to Cullen  80km 
(50 miles) 
Listed as a Great Trail
Regular local use in parts
Rothes Way Craigellachie to
Rothes
5km
(3 miles) 
Partially complete but not yet
commissioned 
Isla Way Keith to Dufftown  20km 
(13 miles) 
In place and signed but some
sections follow minor public
roads with no roadside path
TOTAL (ex-
Moray Way) 
248.6 km 
(154.5 miles) 
Physical infrastructure includes the path or trail walking surface and associated structures like
bridges, path culverts, gates, stiles, steps, fencing, bins, and road crossings. Trail side facilities
such as toilets and camping areas are available for public use. Route ‘furniture’ extends to
signage (for direction and orientation) and interpretive panels/map boards and free leaflets
and publications. At approximately 20 locations is a network of battery-operated counters. 
7.3.1 Proportion on Disused Railway Lines 
Path  Total in Moray 
Metres
On Disused Railway
Metres 
% Proportion
(estimated)
Owned by 
Moray Council
Dava Way 24,658          20,285  82.3 0%
Moray Coastal
Trail   
76,827            5,585  7.3 60%
Speyside Way –
Moray section           
68,919            20,893  30.3 100%
Dufftown Spur  6,500 6,500 100 100%
Rothes Way  4,900 3,370  68.8 17%
Isla Way  20,000 0  0 100%
Whole system  201,805 56,633 28%  56% 
Page 175

Page 176

22 
Note 
 There are some small sections which are both the Speyside Way and Moray Coastal
Trail near Portgordon/Buckie areas, but they are coded as one path e.g. Speyside Way. 
 Forres to Findhorn which is now coded as Moray Coastal Trail 
 Speyside Way includes the Tomintoul Spur 
7.3.2 Physical Infrastructure Condition 
In 201810,  a condition survey of 201.4 km of Moray Routes showed that:
 35.609 km – was in poor (red) condition (mainly due to walking surface) 
 39. 474 km – was in reasonable (amber) condition 
 75.011 km – was in  (green) good condition 
 12.936 km – are routes, mainly, using beaches or dunes where surfaces are dynamic
The Dava Way, approximately 38 km, was not surveyed as part of the 2017 infrastructure
report but is believed to be in mostly reasonable or good condition11.
7.4 Digital Infrastructure 
Many users have smart phones and other devices. The digital infrastructure available to 
Moray Route users to get up to date information and interpretation about their trip  is
based  around a mix of ‘official’ websites run by public bodies, web sites run by commercial
operators and ‘individual’ blogs, and You tube offerings. Apps and QR codes may be
deployed at some locations but there is little evidence of their presence. Moray Way
Association would like to develop a Digital Passport Scheme where a phone could be used to
‘check in’ and possibly download useful information about local services, history, and
wildlife. When ‘checked in’ the information could go live on MWA’s website to show
someone’s progress and when they had walked the whole route. The walker would then
automatically be sent a certificate for walking the route. There would also be opportunity
for them to purchase Moray Way merchandise.   
Many users book services in advance of their trip but smart phone connectivity along the
route allows users to interact during their trip. Sites like Walk Highland and Trip Advisor allow
user generated content and route reviews.
7.4.1 Route Digital Infrastructure 
Website URL Operator  Description 
About – Speyside Way Moray Council  This is the official website for the Speyside
Way as commissioned by Moray Council and
piloted during late 2021 with the Cairngorms
National Park Authority and Highland
Council.                                                           
10 Moray Way Feasibility Study, 2017
11 Source: Dava Way Association, Moray Council, Cairngorms National Park Authority 
Page 176

Page 177

23 
Ordnance Survey, Harvey’s,
Footprint Maps and
Guidebook publishers 
Map and
Guidebook
Publishers 
Digital and paper versions can be amended
for the next re-print and suppliers and
publishers can issue web/email updates to
users as appropriate  
Moray Ways - Paths and
Outdoor Access in Moray
Moray Way
Association  
This website features a searchable collection
of Moray Routes for walking, horse riding,
cycling, sailing, and canoeing. It is in
partnership with Moray Council and funding
is provided to support the hosting costs. It is
visited on average by 7000 people each
month. The site has a connected closed
group FB page with 1.5K members.
Home | The Dava Way
trail from The Cairngorms
to Moray Coast
Dava Way
Association 
This web site carried route maps and
descriptions and wider information on
outdoor activities in Moray 
Speyside Way - Scotland's
Great Trails
(scotlandsgreattrails.com)
NatureScot  This website is on a not-for-profit basis, in a
partnership between NatureScot, Rucksack
Readers and all the managers of Scotland’s
Great Trails. Income from the website will be
invested in its maintenance and
improvement.
Speyside Way - Walking
On Scotland's Highlands
and Trails of River Spey
Commercial
operator 
Offers route information and online route
maps and direction plus route services. User
comments 
Speyside Way
(Walkhighlands)
Dava Way
(Walkhighlands)
Moray Coast Trail
(Walkhighlands)
The Isla Way: Dufftown to
Keith (Walkhighlands)
Commercial
operator 
This established operator is locally based and
provides route information and online route
maps and direction plus information on
route services for all the Moray Routes.
Includes detailed user reviews
The Long Distance
Walkers Association
(ldwa.org.uk)
Membership
body 
Body focused on Long Distance Routes with
its own database of paths and associated
information 
SPEYSIDE WAY LONG
DISTANCE ROUTE
(Aviemore) - All You Need
to Know BEFORE You Go
(tripadvisor.co.uk)
Trip Advisor  Provides reviews and images. Route scores
4.5/5 from 35 reviews 
From the digital infrastructure,  it can be concluded that the Moray Routes information on
the less well-resourced individual sites tends to be outdated and mostly focused on users who
are walking.  The range of styles and logos on all the sites may also present a confusing picture
to the user as there is no consistent style of presentation. 
Page 177

Page 178

24 
8 Overarching Principles for Infrastructure   
8.1 Pipeline of Solutions
This Plan proposes a pipeline of solutions that should address infrastructure needs. There are
two core tests that solutions should meet:
8.1.1 Compatibility with 2022/23 RTIF Criteria
Firstly, compatibility with the 2022/23 RTIF criteria that describe what impacts are expected
through the allocation of RTIF support
RTIF Criteria 
1 Responsible tourism and a carbon conscious approach
2 Addressing pressure points 
3 Meeting strategic needs and gaps 
4 Improving the visitor experience   
5 Bolstering community capacity  
6 Emphasis on deliverability and viability   
8.1.2 Overarching Principles Identified by Moray Council
Secondly, Moray Council have identified what are seen as effectively expansions of RTIF
criteria that should apply to project solutions. These principles reflect the type of  physical
and digital infrastructure the Council wants to support and the sustainable, societal changes
it wants to encourage. They are:
i Addressing challenge through a joined-up approach 
 Adopting a strategic approach to infrastructure project development and link with
other investments and active travel provision 
 Utilising technology and data collection to manage and anticipate demand and
impacts 
 Support existing networks, hubs, and public transport links 
ii High-quality user experience 
 Routes are sufficiently coherent, interesting, and attractive to follow and to
persuade more people to walk or cycle 
 Making routes more accessible for people of all ages and abilities to walk, wheel,
or cycle and traffic free where possible 
 Offering choice to people across the network, especially  where topography may
make provision less accessible
 Well maintained 
iii Best path design and construction practice
 Inclusive and wide enough to accommodate all users, considering future and
predicted usage levels
Page 178

Page 179

25 
 Have a firm, well-drained walking/cycling surface appropriate to the location
 Signage should be an integral part of the design process 
 Design and materials to minimise carbon and sensitive to the location and to the
environment.
 Designed to minimise maintenance
iv Best practice for signage, way marking design and installation 
 Signs should be obvious, clear and legible, and consistent throughout a route or
network with traffic-free routes signed at each end and at destinations and links
along the route.
 Signs should include emergency contact details, so people know who to contact in
an emergency
 Signs should be Scottish Outdoor Access Code (SOAC) 12and Traffic Signs
Regulations and General Directions 2016 (TSRGD) 13compliant and present the
correct information to users.
 Signs and other path furniture and installations should avoid clutter and detracting
from route aesthetics with damaged or redundant ones removed. This can help to
emphasise the messages of remaining signs.
 Creating a route identity that is beneficial in encouraging community participation
and a sense of localism for visitors. Where a route takes on an identity, signage
should be considered as a platform to create a brand. 
 Whilst supporting localism, avoiding too much diversity in individual route section
branding that erodes a wider Moray Routes brand.
 Consider provision of distance or time to destinations on signs. The use of both
distance and time on the same sign within the public highway environment is not
permitted by TSRGD. Traffic free routes should adopt this approach too. For tourist
routes, distance may be more appropriate, and users are less likely to be time
pressured.
v Applies a carbon conscious approach 
 Considering the entire life cycle of a structure by trying to repair, re-use and re-
purpose materials is encouraged. 
 Helping to conserve and retain embodied carbon.
 Where infrastructure is already built, retrofitting and reuse  should be a priority .                                                           
12 The Scottish Outdoor Access Code - mygov.scot
13 TSRGD applies to all signs positioned within the public highway. The regulations ensure that signs are
consistent, legible and provide a clear message to road users. This consistency is achieved by using a
standardised palette of colours, symbols, text sizing and sign shapes. In most cases, traffic-free routes will be
located outside of the public highway boundary and the requirements of the TSRGD will not apply. 
Page 179

Page 180

26 
 How linear routes fit with low carbon public transport is an important
consideration. In remote areas, with high levels of tourism and leisure use, links
and signs to public transport timetables and stopping points will be beneficial. 
vi Respectful of host communities 
 Projects should be developed in partnership with the local community and take
their views into account. 
 Opportunities created for communities to benefit from the facilities created, for
example through charging for use of some facilities or asset transfers.
 Cultural and authentic experience elements should be integrated into the design
where possible 
vii Respectful of the natural environment
 Infrastructure should be of the right scale at the right location with the right
design.
 Impacts on sensitive species and habitats should be avoided
viii Making safe routes 
 Routes should be safe and where the route coexists with traffic, especially where
national speed limits allow travel at 60mph, there should be a barrier or verge
between vehicles  sufficient to make users feel like it is a safe route to be on and
enable all users to move across roads safely 
 Manage route surface unevenness, gradient and narrowness to minimise trips and
falls  
 Ensure separation between routes users and large farm animals which may 
involve barriers like fencing and gates  
 Advise route users that the law expects them to protect themselves against
obvious natural hazards like deep water, tidal areas, and cliffs. However, the law
also requires reasonable assessment and that appropriate measures are taken by
route managers and landowners. 
ix Helping people to share, respect and enjoy the space in line with the Outdoor Access
Code 
 Accept that a level of user conflict on shared paths will happen as more people
discover the pleasure of using routes. 
 Conflict reduction by engaging with path users and promoting the concept ‘Share,
respect, enjoy’.
 Promote cultures and good behaviour where all users whether on foot, wheels, or
horseback, respect each other’s journey and neighbouring land manager and
landowner needs. 
Page 180

Page 181

27 
x Monitoring quality and quantity 
 Appropriate signs showing responsibilities for monitoring and maintenance should
be in place 
 Effective physical infrastructures monitoring systems  – especially for  bridge and
other major infrastructures – should be in place 
 Levels and distribution of data gathering points (counters)  around the network
need to be considered to best assess user numbers and distribution in time and
space.
 Investment in monitoring should be proportionate to the intervention proposed. 
 Data can be used to establish baseline standards and identify gaps and whole
network needs
xi Data evaluation and presentation
 Evaluate what the route section is primarily for (e.g. objectives: provision of a
tourism resource, increasing recreational activity, making journeys safer).
 Evaluate what route infrastructure projects might achieve? (e.g. outcomes:
increased tourism activity with economic benefits to local communities and
businesses, increased recreational activity, improved perceptions of safety, social
benefits).
 Monitoring and evaluation costs need to be recognised and accounted for with
quantitative and/or qualitative approaches costed appropriately 
 Data collection, analysis and distribution should address the requirements of the
infrastructure  plan. For example, metrics are required  to measure  sustainable
tourism revenues and employment generated by network infrastructure  
 Present data and analysis findings in ways that are suitable for the target audience,
demonstrating policy outcomes and justifying resource allocation
xii  Future-proofing routes
 Recognising that post-Covid, the trend  in more people  walking and cycling  on the
routes seems likely to continue.
 Recognising that hardening of Net Zero policy and targets will lead to more of us
travelling sustainably and using the routes.
 Rising cost of living and inflation pressures will mean more people looking for
lower cost options for holidays and leisure involving walking and cycling 
 Recognising that increases in  use, plus climate change induced effects, will impose
a  greater burden on infrastructure and enhanced investment will be required to
even retain a status quo 
8.2 Existing Counter Network
There is a network of existing counters recording user activity on most of the main Moray
Routes. The spreadsheet attached at Appendix 2 represents data supplied by Moray Council
Access Manager. Additional counters have been installed in the past three years by Moray
Council on other active travel sections and in town centres as part of Covid recovery
Page 181

Page 182

28 
measures. In this context Moray Council has experience of both counter technology and of
data collection and management.
Data collection in the rural areas is generally by a Moray Council Ranger or local association
representative (as is the case with the Dava Way) visiting each counter location and
downloading data. Data is then recorded in a spreadsheet with later analysis. Counter
malfunction occurs  from time to time and equipment is aging. 
Page 182

Page 183

29 
9 Moray Routes Users  
9.1 User Characteristics
A principal rationale for further investment in the Moray Routes network is both their current
popularity and the potential to attract more users and trips. For this it is important to
understand user characteristics and to ensure infrastructure enhances the visitor experience
and plugs strategic gaps and weaknesses.
9.2 Walking Visitors in Scotland14  
Walking visitors to Scotland are most likely to be female, however the gender gap is slightly
more pronounced in the long walking market. The largest age groups of walkers are 55-64
and 45-54 for both the long (23%) and short walking (21%) markets. 25–34-year-olds make
up a larger share (17%)  of the long walking market than the short walking market. Millennials
make up 26% of visitors who participate in long walks and 19% of visitors who participate in
short walks when in Scotland.
The majority  (52%) of people who participate in walking as a leisure activity when in Scotland
are of social groups A or B. In 2015, hotels (28%) are the most popular form of accommodation
for walkers followed by staying with friend/relative (24%) and self-catering (22%) relatively
fewer are in B&Bs (7%), caravans (6%) and tents (5%). It seems likely more people may now
use motor homes and Air BnB. 
Those who go on short walks as part of a day visit to Scotland spend almost double (£37) of
those who go on longer walks spend (£19). This is most likely due to those who participate in
short walks having a higher probability of participating in another activity alongside their walk,
whereas a long walk could take up the entire day
9.3 Cycling Visitors in Scotland15  
On average, cycling on a road or surfaced path is over twice as popular an activity to
participate in when on holiday in Scotland than mountain biking but, although those cycling
on a road or surfaced path take longer trips than mountain bikers, they spend less per night.
The age and gender demographics for mountain bikers and road cyclists differ quite
significantly. The mountain biking contingent who visit Scotland are more likely to be male
and under the age of 45, whereas road cyclists are almost equally likely to be female as male
and are predominately between 35 and 54. The social class distribution for both mountain
biking and road cycling is heavily skewed towards social class AB.
For road/surfaced path cyclists, self-catering (33%) is the most popular form of
accommodation followed by staying with friend/relative (18%) and hotels (17%), with
relatively fewer in caravans (9%) and tents (6%). 
14 Visit Scotland 
15 Visit Scotland 
Page 183

Page 184

30 
9.4 Visitors to Moray 
Sustainable tourism is one of Scotland’s key growth sectors identified in the Scottish
Government’s Economic Strategy and is one of Moray’s most important industry, generating
significant economic benefits. Prior to the Covid-19 pandemic, tourism had seen several years
of consistent growth so that by 2019 the sector generated over 10% of Moray’s total
employment and 3.8% of the total turnover of businesses.
The STEAM report for 2021 reports that  tourism and visitors to Moray 16  generated: 
Total tourism sector
income 
£96m generated for the Moray  economy through visitor and
tourism business expenditure
Overnight stays spend   £87m
Day visits spend  £8.7m
Employment  Tourism in Moray supported  2,173 fte jobs
Day visits  Day visits accounted for 32% of visits
Total visits and trips 480k  tourism visits in 2021 generated 1.4 m visitor days and
nights  
2019 comparisons  804k tourism visits in 2019 
Clearly these figures were affected by the Covid pandemic and may not be typical. 2021
figures were at 41% of those recorded in 2019. Parts of Moray  did see a rebound in numbers
during summer 2022.  
The newly established Moray Speyside Business Barometer17 (108 businesses in the tourism
sector) reported that for the second quarter (April to June 2022) around 44% of businesses
expected increased numbers of customers during the next 12 months and 46% expected
increased turnover.  Most visitors are from the UK (77%) although there was a 10% increase
in overseas visitors compared to Quarter 1 in 2022. Barriers to growth were attributed to
supplier costs, bureaucracy and staffing availability and levels. Short term letting legislation
was of particular concern to self-catering accommodation providers – an accommodation
type that may be popular with visiting Moray Route users.  
9.5 Walking and Cycling Visitors to Moray 
Sources investigating  walking and cycling tourism in a Moray context  found that:  
 Adventure sports, short and longer walks were amongst the 10 most popular activities
undertaken as part of a day trip to Moray 18 
 Between 40% and 55% of visitors walked during their visit to the North East. 
 36% of domestic visitors  went walking during their seaside trips 19                                                           
16 STEAM Tourism Economic Impacts 2021
17 Moray Speyside Business Barometer - Visit Moray Speyside
18 Grampian Factsheet 2019 (visitscotland.org)
19 Coastal Tourism 2021 (visitscotland.org)
Page 184

Page 185

31 
 Short walks/strolls up to 2 hours are the preferred activity with domestic tourists
when in Scotland, with 48% more trips including a short walk than those trips that
included longer walks.
 In 2016 Moray only had 2% of the total number of hospitality  business participants in
Visit Scotland’s Walkers Welcome programme20.  
 In 2017 Moray only had 2% of the total number of hospitality  business participants in
Visit Scotland’s Cyclists Welcome programme 21.  
Taken as long-distance, multi-day routes, Moray Routes are all described as ‘challenging’22
but this mainly refers to distances involved in tackling them as a multi-day trip. People do
undertake multi-day trips especially on the Speyside Way.   
But as many sections are signed and accessible from public roads, including the A95 and A96 
trunk roads, and have  generally level paths and good surfaces, they are used as much easier
short walks and active travel routes by a much larger number of visitors and Moray residents.   
Significantly more people undertake shorter walks than longer ones. 20% more overnight
stays were by walkers preferring shorter walks  than those preferring longer walks.  However,
the proportional differences between spend and nights for these walking groups is not as
large as might be expected. 
Walkers on trips who go on longer walks when visiting, spend on average £1.40 more a night
(2015 figure)  and stay for 1 extra night hence their total spend is proportionately greater 23. 
A review of online user generated content indicates Moray Route popularity when compared
to other LDRs, with the West Highland Way taken as Scotland’s most popular LDR and used
as a baseline. 
9.6 Route Popularity Comparisons - As of August 2022
Routes (All
are listed as
Great Trails)  
Trip
Advisor
Reviews
(Number
posted) 
Expressed as
a percentage
of total TA
West
Highland
Way reviews
Walk
Highland
members
Route
User
Reports 
Walk Highland
members who
have reported
route
completion
Completers
expressed as a
percentage of
the West
Highland Way
completers 
Speyside Way 35  8 13  487 14.6
Dava Way 11  2.5 8  250 7.5
Moray
Coastal Route 
26  6 11  197 6
Great Glen
Way
114  27 25  1153 35                                                           
20 walking-topic-paper-2017.pdf (visitscotland.org)
21 cycling-topic-paper-2017.pdf (visitscotland.org)
22 Challenging - Moray Ways
23 walking-topic-paper-2017.pdf (visitscotland.org)
Page 185

Page 186

32 
West
Highland
Way
429  100 104  3314 100
Fife Coastal
Path 
114  27 14  326 9.8
Southern
Upland Way 
7  1.6 29  211 6.4 
Note: The Walk Highland web site attracts over 25,000 daily visitors
9.7 Trip Advisor reviews from Speyside Way users included the following comments:  
 “The signposting is great and the surfaces well maintained and good for cycling.” 
 “The trail is adequately marked except for the last 300 yards into Buckie. We almost
missed the start/end sign. “
 “Don’t we all wish our communities had safe, long-distance pathways and routes like
this?”
 “The distances advertised in books, mile markers and websites are either wrong or
out of date if the route has changes.”
 “We enjoyed the path as it had no traffic and it goes through forest, with some
inclines. Paths are well maintained.”
 “We walked from Grantown to Ballindalloch, following the Speyside Way markers.
The Speyside Way web site says it is 13 miles. This is incorrect. We were carrying two
separate smartphones with apps for measuring distance, and both recorded just
under 16 miles.”
 “We did skip one small section, written up as pretty rough, and no accommodation at
the end of that section,”
 “We were able to easily find our way to Craigellachie from Inverness by way of Elgin
(and the Glen Moray distillery) using the train and bus, but our tour company did not
give us very much of a heads up on our onward travel options from Ballindalloch -
which does not have any bus route options during the week.” 
Analysis of the data on Moray Route users (in the overnight visitor category) suggests that we
can reasonably assume:
 A large majority of route users are on short ‘out and back’ trips and are using the
network for short walk while on holiday 
 Fewer in number are multi-day users for whom walking is the primary reason for their
visit. Those that do are domestic visitors from elsewhere in Scotland and from the
rest of the UK with international visitors often being from the USA or Canada 
 Route visitors are most likely to be:
o Female
o In the 45 to 64 age bracket
o Of AB social class
o Mostly staying in hotels and/or self-catering for 5 days
Page 186

Page 187

33 
o Have an average spending per person in Moray of £375 – £450 per trip  (2022
estimate) 
 Route popularity for multi-day users is much less than the West Highland Way and
Great Glen Way, certainly for domestic markets 
 The routes appear to be seen as ‘soft adventure’ for users.  The strong cultural focus
on distilleries and villages appeals to an older segment with options for rest days and
‘hopping’ harder sections by bus or taxi readily available   
 Multi-day international users are more likely to use local services – hotels,
restaurants, taxis, baggage transfers, bike hire etc. International visitors often use
service companies to make advance booking etc. 
 Satisfaction with the route physical quality is generally high with the notable
exception of the section just south of the Moray boundary 
 Digital infrastructure provision for the routes is seen as dated. 
9.8 Carbon Implication of Walking and Cycling 
Walking and cycling are also methods of transportation and participants in these activities are
contributing less to carbon emissions. Carbon reductions also have a financial, social, and
environmental value. For comparison, Wilderness Scotland have calculated the carbon
footprint of an eight day,  seven-night guided walking trip on the West Highland Way at 129kg
(16kg per day) of CO2 per person24. A seven-day, six-night guided cycling tour of the Scottish
Borders is 121kg (17.3kg per day) of CO2 per person25. This includes only accommodation,
food,  trip  activities and administration. Personal travel (which could include air travel) and
equipment purchase etc is not included.  
Using these figures as a baseline but depending on the accommodation and food selected and
if walking/cycling, Moray Routes users would  have a daily emission equivalent of 15kg – 20kg
of CO2. A visitor on a car-based touring holiday in Moray visiting mainly indoor attractions is
likely to  have a significantly higher daily emissions rate. This is relevant in the context of the
route map to Net Zero adopted by Moray.
9.9 Moray Routes Market Trends and Drivers  
A number of  factors seem likely to drive the market for future users of Moray Routes: 
Shorter term drivers -  1/2  years 
 Re-assurance destinations are safe and open post Covid-19
 Cost of living pressures driving more people towards lower cost leisure options like
walking and cycling 
Medium term drivers -  3/5 years
 Growing staycations market and interest in less well-known destinations (such as
Moray) 
24 Carbon Labelling - Wilderness Scotland
25 The current global average per person per day is 14kg of CO2 (India = 5kg, UK = 15kg, US & Canada = 38kg
and Australia = 42kg). An average of 10kg per day is considered sustainable in the longer term.
Page 187

Page 188

34 
 Demand for outdoor and nature-based experiences 
 Climate change factors like hotter summers pushing more people ‘north’
 Increase in community-based facilities like campsites, hostels and Aires in close
proximity to routes
 Interest in linking food and drink experiences with walking and cycling  
 Health and wellbeing 
 Call for responsible tourism and Net Zero priorities
 Increasing use and application of technology
Longer term drivers - 5 plus years 
 Ageing demographic with greater interest in ‘soft’ adventure, nature, and culture 
 Low carbon options including e-bikes 
 Local Place Plans increasing community involvement 
 Carbon allocations favouring low emission activities 
Beyond the effects of current uncertainties  in the economy, most of these drivers are positive
towards greater interest in and use of networks like Moray Routes from specific audience
groups. This emphasises the need to improve Moray Routes infrastructure capacity and
resilience  to meet future demand and pressures. 
Page 188

Page 189

35 
10 Moray Routes Infrastructure Condition and Management
10.1 Physical Route Management
Currently, the management and promotion  of Moray Routes is delivered through a range of
bodies including  Moray Council, Visit Moray Speyside, landowners, several locally based
volunteer route associations, and community companies. Engagement with these multiple
actors and priorities  is an ongoing role for Moray Council.  
There is further involvement from local businesses providing route services, landowners and
managers providing route integration within their own operations and funders, such as
renewable energy developers, providing financial resources to invest in infrastructure
improvements. However, securing landowner cooperation and agreement for some route
sections can have legal and financial implications and may take time to resolve. 
Moray Council provides some core revenue to support most of the Moray Routes network,
mainly through staffing for day-to-day maintenance like strimming  vegetation and cleaning
toilets and bins. Major route improvements are mainly done through capital funding for
individual projects such as Tomintoul and Glenlivet Landscape Partnership Access
Improvements,  the Coast to Country Project, and the Speyside Low Carbon Hub Project.
Much of the work on the network is done by volunteer associations and community
companies. The Dava Way Association  work on one section of the route (the Dava Way) to
ensure that it is well maintained and regularly improved. They organise regular monthly  work
parties for most of the year along the entire route26. The Moray Way Association run an
annual walking and outdoors festival in Moray, promote the Moray Way as a circular long-
distance path and have responsibility for the Moray Ways Website.27 The Rothes Way
Association, is a registered charity and managed by a voluntary group of trustees and
supported by a wider membership28. RWA has a team of volunteers that regularly carry out
maintenance work on the path.
Drummuir 21 was established as a charity in 2000 to encourage and promote the construction
and restoration of a network of footpaths within the Drummuir area to encourage greater
participation in the activities of walking and cycling and to advance  sustainable development.
This means that there is considerable variation across the Moray Routes in terms of physical,
digital, interpretive, marketing and business support infrastructure. This diversity of
approaches generates strengths. Route responsibilities are shared and do not fall entirely on
one body. However, there are weaknesses associated with this approach too around
consistency of visitor and user experiences, capacity, revenue and capital, and resources
available to voluntary community groups and clarity over route responsibilities. 
User feedback identifies weaknesses in network sections outside the Moray Council
boundary. Users are unaware of administrative boundaries and these route weaknesses                                                           
26 Home | The Dava Way trail from The Cairngorms to Moray Coast
27 The Moray Way Association - Moray Ways
28 Managing the Project | The Rothes Way
Page 189

Page 190

36 
impact on the overall user experience. Moray Council is working with neighbouring
authorities, notably the Highland Council and the Cairngorms National Park Authority to
address these shortcomings.   
Moray Routes face three principal route section infrastructure challenges defined as: 
1. Rails to trail sections
2. Hill path sections
3. Coastal trails 
10.2 Rails to Trails Sections
Rails to trails is a common feature of Moray Routes. Railway lines closed after the 1963
Beeching Report - The Reshaping of British Railways have become paths. Approximately 30%
of the Moray Routes network follows rail lines and 47 km of these routes and their
infrastructure of bridges, culverts are owned by Moray Council. 
Disused railway lines, although often over 100 years old,  were generally  robustly constructed
and have many advantages for pedestrians and cyclists.  Dictated by topography, they  follow
the shortest line between settlements and along gentle gradients which make them very
accessible. 
In the absence of a Moray-wide budget for physical maintenance activity,  we have used the
2015 Maintenance Practices and Costs of Rail-Trails to give an illustration of the scale of costs
associated with keeping a base standard of trail condition29.  Although this is a US-based
publication, we consider the trail standard management issues in Moray to be very
comparable. 
The US figure in 2014 was $1006 per mile.  Updating to 2022 in a Moray context, we have 
adopted a base cost of £1000 per km for non-asphalt trails such as occur on the Moray Routes.
Estimated  requirements along the Moray Route sections that follow disused railway lines are
estimated to include the following:
Activity  Budget Split
 Annual mowing/ strimming 12%
 Vegetation management – trimming bushes 11%
 Tree removal  5.5%
 Surface – repair rolled whin dust 10%
o Surface clearing or organic materials – leaves
moss etc
11%
o Resurfacing  Every 10 years
 Drainage  
o Clearing of ditches and culverts 5.5%
 Trail furniture 
o Signage maintenance  6%                                                           
29 resourcehandler.ashx (railstotrails.org)
Page 190

Page 191

37 
o Trailhead maintenance  – picnic tables ,bins, car
park, benches 
6%
o Gates and bollard maintenance  5%
o Fencing maintenance  5%
 Litter clearance  3%
o Toilet servicing and maintenance  13%
 Bridges  
o Inspection regimes by certified engineers  Every 3 years 
 Counters  5%
 Invasive species  2%
 Vandalism and fly tipping  5%
 One off storm/flood damage  As required 
TOTAL 100% 
10.3 Hill Path Sections
The popularity of higher-level walking , such as offered by the Tomintoul spur, continues. In
the Cairngorms National Park,  18% of visitors reported participating in high level walks with
hill-walking being a reason for their visit and 3% undertaking multi-day walks. Unobtrusive
yet durable path builds, and repairs will conserve the vulnerable habitats being destroyed
through the path erosion and braiding caused by a combination of recreational use and
weather.  Beyond Auldich, for example,  the Tomintoul spur tends to have small amounts of
work to path surfaces spread over a long distance. Costs relate to being able to get easy access
with machines and win path materials locally. Path standards are set out in the Upland
Pathwork Manual 3rd edition  2015. 30
10.4 Coastal Trail Sections
The popularity of coastal trails has also increased in recent years and in addition to user
pressures,  dynamic coastline changes place pressures on routes through marine erosion. Cliff
top routes can be vulnerable to collapse as cliffs are undermined and eroded.  Recent major
storms have also exposed the vulnerability of coastal woodland plantations to windblow. A
route may be blocked, as at Dallachy Wood, forcing users to find alternatives (if there is one)
until the original route is cleared.   
On sections, such as between Findhorn and Roseisle,  many users walk along the beach when
tidal conditions permit. Rising sea levels and storm conditions can make beaches inaccessible
at high tides requiring inland route options to be made available. This section does have an
informal path network of optional desire lines through the forest either side of the marked
trail.
However, even this is under threat. A coastal erosion study for the Findhorn to Roseisle
section commissioned by the MOD in 200231 concluded that an erosion rate of between 0.6m                                                           
30 Upland Pathwork Manual (nature.scot)
31 Microsoft Word - Text (forestryandland.gov.scot)
Page 191

Page 192

38 
and 2m per year was ongoing.  Second World War defences along the beach give a known
baseline which clearly illustrates the speed of progressive coastal retreat in this location.
Erosion also squeezes users into a smaller section between the beach and the security fencing
protecting the MOD estate at Kinloss. An adaptive management approach of managed retreat
rather than hard engineering solutions is the preferred option in this location. Trail routes and
paths will need to be accommodated within this approach. Unexploded ordnance emerging
from the sand in this location is a further hazard. 
10.5 Route Infrastructure Summary  
Whilst some of the work on these sections is classed as on-going maintenance, over time even
the most robust infrastructure ages and deterioration is accelerated by more intense rain
events, storms, heat, erosion by water and vegetation growth. All have an impact on route
sections and especially on  features like cuttings, culverts, engineered drainage systems  and
bridges. This can lead to larger more ‘catastrophic’ route section failures requiring major
capital investment. The forest along the shoreline plays a role in preventing dune collapse and
localised inundation during storms, but this role is limited. The main protective role of the
forest is to limit the windborne movement of sand by creating a physical barrier, reducing
wind speeds at ground level, and creating a continuous vegetation layer.
The Moray Routes – Bright Futures Strategic Infrastructure Plan has identified vulnerable
route sections, some of which are considered as strategic gaps and are put forward for capital
funding support. Smarter data gathering is also put forward for capital funding support to
better identify the most popular Moray Routes sections. More accessible and dependable
data will enable both popularity and risk/vulnerability to be mapped together to better inform
priorities. 
10.6 Route Stewardship Summary
Route stewardship is in the hands of multiple partners. Moray Council carries the most
responsibility and employs an access officer and ranger staff who work alongside active travel
and economic development officers. Multiple volunteer associations and community groups
either own or have adopted route sections and responsibilities.  
Body  Status  Role 
Moray Council  Local authority  Access Authority 
Economic growth and  development
Environmental and commercial services
Dava Way
Association 
SCIO  The Dava Way Association is the body which works
on the route to ensure that it is well maintained and
regularly improved.
Rothes Way
Association 
SCIO A community-led project which aims to provide a
multi-use path linking Rothes and Craigellachie,
Moray Way
Association  
SCIO  To promote The Moray Way, a 100-mile long circular
walking route combining elements of the Speyside
Way, the Moray Coastal Trail and the Dava Way.
Page 192

Page 193

39 
Drummuir 21 Unincorporated
association 
To encourage and promote the construction and
restoration of a network of footpaths within the
Drummuir area, for local people and visitors and to
encourage greater participation in the activities of
walking and cycling
To advance the education of the public regarding
environmental issues and sustainable development
The Laich of
Moray Active
Travel Routes 
(LoMATR)
SCIO To provide outdoor recreation facilities and activities
for the local community and its visitors, by initially
establishing a shared use path/active travel link
between Hopeman and Lossiemouth.
Findhorn
Village
Conservation
Company 
Company
Limited by
guarantee with
charitable status 
To advance environmental protection or
improvement including preservation, sustainable
development, and conservation of the natural
environment; and the maintenance, improvement, or
provision of environmental amenities for the
community
Crown Estate
Scotland
Public
corporation of
the Scottish
Government
To be responsible for the management of land and
property in Scotland owned by the monarch in right
of the Crown.
Forestry and
Land Scotland 
Government
agency 
To manage the national forest estate 
Private
Landowners 
Private
companies 
To manage land and property 
Moray Local
Outdoor
Access Forum
(MLOAF) 
The LOAF is an advisory body to Moray Council in
their  role as the Area Access Authority. The Forum
sets its own remit with the emphasis on practical and
achievable aims and targets. 
In addition, The Moray Walking and Outdoor Festival has supported and promoted over 30
individuals, organisations, and businesses to set up walking tours. The festival has been a
catalyst for several of them to run all year round events. 
Page 193

Page 194

40 
11 Funding Sources
11.1 Known Funding Sources
Moray Council Capital Programme has the potential to direct funding to these projects, but
this requires full Council and/or relevant committee approval.
UK and Scottish Government investment in Moray: 
 £100M Moray Growth Deal
 The Just Transition Fund (JTF) is a £500m, 10-year commitment that will support
projects in the North East and Moray which contribute towards the region’s
transition to net zero.
https://www.gov.scot/publications/just-transition-fund/
Other funding sources:
 EDF Renewables Dornell Windfarm Community Benefit Fund
 Other renewable energy benefit funds 
 National Lottery 
 Sustrans
 Coastal Communities Fund
 Various Foundations and Trusts with Moray links 
 Recently launched (2022) sustainable tourism fund in Moray:
https://fairbnb.coop/2022/05/06/fairbnb-coop-reaches-scotland
The different Way Associations across Moray have received funding and are receiving funding
from a variety of sources including:  
Association  Sponsors and Partners 
Dava Way  The Budge Foundation
Paths For All
LEADER
BBC Breathing Spaces
AJ Engineering
Finderne Development Trust
Lottery Community Fund
Berry Burn Community Fund
Sustrans
Outdoor Access Trust for Scotland 
Rothes Way  Forsyth Group
Speyburn Distillers 
Ian Macleod Distillers
Gordon and Edna Baxter Foundation
Diageo
Berry Burn Community Fund 
Adam Family Foundation
Andy Innes Aerial Photographer 
Moray Way  Walking festival ticket sales, 
Page 194

Page 195

41 
Adam Family Trust 
Robertson Trust
Tsi Moray Participatory Budgeting
Ramblers Holidays Charitable Trust 
Tesco 
11.2 Moray Routes Infrastructure Fund 
Walking, wheeling, and cycling networks are at the top of Scotland’s sustainable transport
hierarchy and key to the nation’s tourism offer. However, like many public bodies, Moray
Council faces significant pressure on its revenue budget with a host of competing priorities.
The current economic climate and a likely further squeeze on the Council’s settlement grant
from the Scottish Government are likely to add to this pressure.
One way to ensure funding is available for Moray Routes could be through the establishment
of a restricted Moray Routes Infrastructure Fund (The Fund). This could provide financial
support for maintaining historic engineered infrastructure that carries Moray’s share of the
national network. Much of Moray’s core wealth in food and drink and textiles we enjoy today
benefited from this 19th century infrastructure.
The Fund could fulfil its purpose by preserving the capital of donations, funding awards and
investments for distribution for maintenance and repair. As a public asset, Moray Routes are
not intended to be profit-making. Accordingly, the support that The Fund could provide is
critical to the success and sustainability of the Moray Routes and their ability to contribute to
society.
The Fund could act as a bold response to the pressing challenge of retaining the ‘status quo’
of 100-year-old structures rather than to rely on ‘Emergency’ funding after sudden failure or
collapse. 
The Fund could be formed around part of the £50,000-a-year community benefit income
generated by the Dornell Wind Farm site on the Glenfiddich Estate and awarded to Moray
Council over a 25-year period. Where structures are part of the National Cycle Network,
contributions from Sustrans could be sought. Other renewable energy applications consented
for Moray could be encouraged to contribute to The Fund, as could a proportion of other
developer contributions as part of Planning Gain. The Fund could also be open to private gifts
and donations from route users, supporters, and foundations. 
Full structural surveys of infrastructures – bridges, tunnels and earth works would be carried
out to prepare a risk-based programme of works to secure a status quo condition longer term.
The main objectives would be to:
 install ‘tell-tale’ markers on key infrastructures and conduct a digital survey to detect
change and movement in structural elements – stone and metal work – to give
baseline condition assessments. These should be repeated at regular intervals.   
 maintain the integrity of structures and halt the corrosion of metal work
Page 195

Page 196

42 
 apply coating systems which would lessen the need for repeated applications and
general maintenance.
 stabilise earth works and drainage 
Key outcomes sought: 
 sustainable Moray Routes network
 major gains in asset reliability, availability, safety, and life
 lower whole-life maintenance costs  
Page 196

Page 197

43 
PART 2 – PROJECT OUTCOMES
12 Costs and Details
12.1 Summary of Indicative Capital Costs (inclusive of VAT) for Tier 1 and Tier 2 Projects
Summary: Tier 1 Projects 
Project  Indicative 
Capital Cost 
Additional Notes
1 Smart Destination  £102,450 -
£111,450 
The number of LoRaWAN Gateways (base
stations) has yet to be agreed with partners.
Each Gateway has been costed at £600
(estimated number required: 20-30)
2 Informed Destination  £87,000 Precise locations to be discussed with local
partners 
Total Value Tier 1  £189,450 -
£198,450
Subject to agreement on the final number of
Gateways required (in the range 20-30)
Summary: Tier 2 Projects 
Project Indicative
Capital 
Cost
Additional Notes
3 Access for All £73,500 
4 Venture up the Hill £246,000 This does not include costs from Transport
Scotland for delivery of informal crossing of
A95 and a new safe path alongside A95
(estimated in range £125,000 - £175,000)
5 Link to the Trails £450,000 Subject to detailed engineering reports for
steel structure and bridge inspections
6 Distilleries Trail £72,000 -
£79,500
Subject to confirmed costing for Section 3
from Rothes Way Association
7 Historic Connections £112,500 
8 Coastal Connections £187,500 With exception of works being undertaken
by Crown Estate Scotland on tree removal 
Total Value Tier 2  £1,141,500 -
£1,148,500
Does not include Transport Scotland costs.
Also subject to detailed engineering reports
for steel structure and bridge inspections. 
Page 197

Page 198

44 
12.2 Tier 1 Projects in Detail
Unlocking the power of Moray Routes 
Project 1: Smart Destination – Sensors (Counters) and App 
Project
Description 
Moray Routes network extends over 250km. The routes are experiencing
growing pressures in some locations due to their rising popularity, but there is
significant potential for much greater levels of use, as illustrated in the Plan. 
Within Project 1 Smart Destinations, two separate actions are proposed: 
Page 198

Page 199

45 
Action 1 – Counter/Sensor Network 
User monitoring  process,  including  data  collection,  and  using  the  data  in 
reporting the combination of systematic visitor counts and surveys to establish 
the diverse picture of Moray Routes visitation. 
Visitation  data may be combined with survey data on trip characteristics  and
multipliers and  used  to  estimate  visitor  spending  and  economic  effects.
Route level data can be combined to estimate Moray level visitor spending
effects. Powerfully, they highlight how route investment can contribute to the
local economy. 
The use of technology to assist with managing visitors will be increasingly 
important to provide accurate information to:
 Help deploy resources such as Ranger staff to where they are most
needed and to build evidence required to make and evaluate the
effectiveness of future infrastructure investments.
 Help visitors in advance of their visit and during their visit. 
Collecting meaningful data from around the route network is essential to
understand and better prioritise investments in staffing, route management, and
promoting and enhancing a more enjoyable and sustainable visitor experience. 
Data can provide real-time user information and a continuous count log to
facilitate the statistical analysis of user patterns. Data can also provide early
indications of potential problems. 
The Smart Destination project proposes to develop the use of  IoT sensors to
generate real time ‘user level’ data, reporting on Moray Route use and
geospatial (mapping) technology. This involves installing 27 sensors (see counter
map below) to monitor route use with information directed to a dashboard
facility with integration into Moray Council systems to allow staff to make timely
decisions  based on use patterns. The counter/sensor network will:  
 Enable proactive management of capacity on Moray Routes through
timely diversion and signalling by public bodies, redirecting visitors away
from potential overcrowded spaces and where appropriate, enable
deployment of personnel to intervene
 Enable visitors to understand where routes are, how to get to them, and
what other attractions and facilities exist nearby
 Potentially create business opportunities for Moray’s hospitality and
tourism businesses, able to capture spontaneous demand as visitors
change their plans and look for alternatives places to visit or activities
 Reduce negative environmental impact of overcrowding and traffic
congestion
 Signpost App users (locals and visitors) to public transport and cycle
routes to encourage use of alternative travel modes and reduce carbon
footprint
 Gather a range of data so that Moray Council can see and predict where
problems are likely to occur (comparing current trends with historic
activity)
Page 199

Page 200

46 
 Reduce potential recurrence of  Covid type pandemic effects through
better management of  physical distancing and site capacity 
Action 2 – Visitor App 
Examples of existing App advising on car parks occupancy 
The App will build on the current digital infrastructure already in place to
increase its usefulness.  The App will support: 
 More sustainable travel by use of footpaths and bike paths
 User friendly interface helping visitors to make informed decisions on
more sustainable travel by use of footpaths and bike paths 
 Difficulty ratings of route sections around trail surface and steepness
through 3D visualisations showing contours and summits
 Points of interest along the route, including food and drink, public
transport and accommodation giving practical information to visitors 
 Driving revenue for local businesses along the route 
 Convenient and downloadable map section files 
 “Green infrastructure” mapping of areas near routes that would
highlight levels of biodiversity and how to support this
 A new Digital Passport Scheme proposed by Moray Way Association   
Functionality can be added to: 
 Capture Crowd-Sourced information uploaded by users (auto time-
stamped, location-tagged, photographed):
 Deliver local promotion to ‘push’ visitors to other parts of the route
network that are less busy 
Page 200

Page 201

47 
 Promote citizen science / “eagles seen here today”
 Seek user permission to track movement patterns on routes, linked to
habitat impacts – trampling along key routes
 Provide Augmented Reality Interpretation (using existing data sets) such
as impact of climate change in 2050 at this point on river flow
 Add messaging:  Eg Local businesses open for food and drink etc. 
 Link to weather and tidal data for shore walking – change during the day 
 Advise on sensitive wildlife – capercaillie, nesting birds
 Carry out immediate surveying of visitors
 Support and link to a Digital Passport Scheme (which has been
researched by Moray Way Association) 
Strategic Fit Moray Routes Bright Futures Objectives 1, 2 and 3. 
RTIF Criteria.
Local and national strategic direction. 
What  Action/
Projects are
Proposed
Action 1 – Counter/Sensor Network 
Counters in 27 locations as shown on the map above 
20 – either side of main Tourism Hubs
7 – mid trail locations to record through traffic 
(3 additional counters scheduled for further provisional main Hubs)   
Installation and 3 years data management – direct access network to Moray
Council or Cloud portal link managed by system supplier. 
Action 2 – Visitor App 
One App to cover the Moray Council area. Downloadable from App stores. 
Purpose  Real time data to be delivered to a dashboard central control point connected to
route management partners. 
Visitor App can convey information direct to visitors, based on counter data and
a wide range of choice to engage with local businesses, plus advisory messages
such as wildlife sighting and high fire risk. 
In due course, App users may be able to submit photographs and details of where
they see minor repairs that are needed, with an accurate geo location tag. 
Opportunities  Moray Council  has  already installed  a network of new counters  in town centres
and on active travel routes. Enhanced use of technology is seen as a core element
of the Moray Growth Deal.   
The sensors and the App are connected either to the LoRaWAN (Long Range Wide
Area Network) or the existing cellular network.  LoRaWAN is networking protocol
designed for wireless connection of battery operated ‘things’ like car park sensors
(or IoT devices) to the internet in regional, national, or global networks. 
LoRaWAN is a wireless network (like WiFi or 4G) but is free to use and with some
important differences:
Page 201

Page 202

48 
 LoRaWAN uses very little power, so battery powered LoRaWAN devices
can last years on the same battery. For example, people sensors 
 LoRaWAN base stations (or gateways) can provide coverage for several
kilometres (more if mounted at height). WiFi has limited range  
 LoRaWAN only allows *tiny* amounts of data, but from many devices - 
ideal for  sensors that just count cars or people. Sensors can be configured
to determine direction of travel
 Cellular connections utilise batteries and roaming SIMs which allow
contact to made with any cellular network in the vicinity. These may be
more suitable if there are no reliable sites for installing a LoRaWAN
gateway connection. 
Constraints  Partnership work is required on:
 Establishing and installing a counter network
 Capturing and utilising data to aid management 
 App development and trialling 
 Additional App functions 
 Ensuring content and software are updated    
Indicative
Capital Costs
Inclusive of all capital costs, design, and installation (counter network yet to be
designed): 
Project1 Action 1  Number  Unit Cost Total
LoRaWAN Gateways
(base stations)
20-30 £600 £12,000 -
£18,000
Counter/Sensors –
LoRaWAN 
14 £300 £4,200
Counters/Sensors  -
Cellular 
13 £1700 £22,100
Project 1 Action 2    
Initial App
development  
£30,000
Sub Total   £68,300 –
£74,300
Contingency (25%)   £17,075 -
£18,575
TOTAL   £85,375 -
£92,875
TOTAL + VAT (20%)   £102,450 -
£111,450 
Example of suppliers: 
Connected Things Store – Connect your LoRaWAN devices to the IoT
Home (wildernesssensors.com)
Note discount on quality may be possible. 
Further discussion required with Moray Council regarding existing sensors on
recently installed active travel routes and how many Gateways are required based
on wider topographical issues (estimated to be 20-30 required). 
Page 202

Page 203

49 
App development - £30,000 mainly allocated to initial App development, ideally
using existing route builder software, and installing Moray Routes and
information.
Example: 
Interactive Route Builder - Whereverly 
Potential 
Delivery
Agents  
 Moray Council  
 Specialists in developing and delivering digital products including large-
scale online services, mobile Apps, and digital tools 
Potential
Sources of
Match
Funding and
Revenue
Streams  
 Moray Council match funding from capital budget (subject to approval
from the relevant committee)
 Income for maintenance/repair and management system/staffing
requirements in the long term from Moray Council revenue budget 
 Moray Routes Infrastructure Fund 
 Just Transition Funding  
Timetable  for
Delivery  
 Pilot work in 2024 to test the App 
Monitoring
and
Evaluation 
 Route counters
 App adoption  
 Social media posts 
 Visitor satisfaction levels 
Additional
Comments 
Future phases to expand use of  technology for visitor management, visitor
safety, asset management, education/interpretation, promotion of neighbouring
facilities.   
Page 203

Page 204

50 
Project 2: Informed Destination - Interpretive Hubs 
Project
Description 
Moray Routes network extends over 250km. As visitors adapt to life after the
Covid-19 pandemic and encounter rising living costs, new and different
consumer behaviours and expectations are developing. 
Localism and the unique identity of a destination are becoming more important
to the visitor as they seek out value for money and value for time. Customers’
expectations of a “localised” experience when discovering what’s on their
doorstep, is a strong feature of the Moray offer. 
Authentic, localised experiences in Moray can often go hand in hand with food
and drink experiences such as distilleries offering whisky or gin tastings and
Page 204

Page 205

51 
personalised food pairings. These blend well with walking, cycling and even
canoeing down the river Spey.   
Tourism Hubs are proposed at 10 locations (see map above):
Forres; Findhorn; Lossiemouth; Spey Bay; Buckie; Craigellachie; Rothes;
Dufftown; Cragganmore; Tomintoul. 
Tourism Hubs are considered key locations on the routes where people are likely
to start and/or finish a section of the trail. Triangular signs and counters/sensors
(see detail below) will be installed to help people understand:
 Their current location in the wider network of Moray Routes
 Their current location in the local network, perhaps associated with the
local way association
 Information relative to the local settlement(s), for example, link to an
App, and other locally important information 
Mid Route Hubs are proposed at a further 7 locations (see map):
Roseisle; Hopeman; Portknockie; near Ben Aigan; Auldich; near Clash Damph;
mid Dava Way. 
These will include counters and some interpretive information. In the case of
Clash Damph, these will be located at proposed viewpoint on Tomintoul Spur. 
Future Hubs are proposed at 3 locations (see map):
Nairn; Grantown-on Spey; Keith
Future discussions to take place on improving information and connectivity for
visitors at these locations. 
Strategic Fit Moray Routes Bright Futures Objectives 1, 2 and 3.
RTIF Criteria.
Local and national strategic direction. 
What  Action/
Projects are
Proposed 
Triangular signs will be installed at each of the 10 Tourism Hubs (17 in total).
Counters will be installed at each of the Tourism and Mid Route Hubs. 
Design is based on three A1 size panels, vertically mounted within a triangular
mounting structure. A roof structure could be an option – perhaps in a pagoda
style reflecting the Charles Doig design and the area’s whisky heritage? 
Panels will be of a material like Glass Reinforced Plastic or High-Pressure
Polycarbonate (Rhino panels) which gives a  tough and robust finish for outdoor
graphics with UV stability, resistance to discolouration, surface haze and
weathering. 
Proposed content on signs:
We are proposing a maximum of 200 words per panel with attractive illustrations,
which communicate a few clear messages and stories. 
Maps will be kept simple with information that does not date. Detail can be
included on the App which people can carry with them. 
Page 205

Page 206

52 
QR codes and Tags  will be included to direct users to websites and to the App. QR
codes can be readily updated. 
The design of mount is important. We wish to create a feature that stands out in
a variety of environments. Commonly chosen materials are oak, pressure-treated
softwood, or steel (either galvanised and powder-coated or stainless steel – fitting
with the railways theme). 
Photos    
Purpose  Messages associated with the Tourism Hubs will be based around: 
 Being part of the wider Moray Routes Network
 Local route section either side of the Hub
 Local and site-based interpretation – focus on respecting local people and
their resources – what there is to see, do and learn. 
Messages associated with the Mid Route Hubs will be simpler: 
 Being part of the wider Moray Routes Network and reassurance to
‘through’ walkers and cyclists that they are on route. 
Opportunities  Both types of Hubs will also be used to carry the sensors/counters. The mid route
hubs will be used to track more of the multi-day users of the network who are
likely to be overnight visitors. 
Constraints  Discussion with existing route management bodies and community associations
to enable best integrations with current signage approaches and locations.
Planning consent may be required, although in some locations existing signage
will be replaced or at least updated. Site selected likely to be within ownership of
Moray Council or other partner bodies. 
Hubs may be vulnerable to damage, so robust construction materials and
methods will be utilised.   
Indicative
Capital Costs 
Inclusive of all indicative capital costs, design, and installation: 
Project Number  Unit Cost Total
17 Tourism
Interpretive Hubs
17 £3,000 £51,000
7 Mid Route
Interpretive Hubs
7 £1,000 £7,000
Sub Total   £58,000
Page 206

Page 207

53 
Contingency (25%)   £14,500
TOTAL   £72,500
TOTAL + VAT (20%)   £87,000 
Potential 
Delivery
Agents   
 Moray Council  
 Interpretive designers and installers
Potential
Sources of
Match
Funding and
Revenue
Streams  
 Moray Council match funding from capital budget (subject to approvals
from the relevant committees)
 Income for maintenance/repair and management system/staffing
requirements in the longer term from Moray Council revenue budget and
Moray Routes Infrastructure Fund 
 Moray Routes Infrastructure Fund 
 Just Transition Funding 
Timetable  for
Delivery  
 2023/24
Monitoring
and
Evaluation 
 Sensors and counters
 Visitor surveys 
 Social media posts 
 Visitor satisfaction levels 
Page 207

Page 208

54 
12.3 Tier 2 Projects in Detail
Unlocking the power of Moray Routes
Project 3: Access for All - Findhorn
Site Description 
The village of Findhorn acts as a key Tourism Hub connecting the Dava Way coming
into Forres from the south on to the Moray Coastal Trail as it passes through
Findhorn. The stunning coastline attracts many visitors to the area and the area
benefits from a proactive community presence through the Findhorn Village
Conservation Company. 
Page 208

Page 209

55 
There are two main car parks (West and East) with plans to refurbish the existing
toilet blocks in 2022 in the West car park and on the road down to the marina.
They also hope to locate a further toilet block, as indicated on the above map.
This adds to the recently completed Aires Motorhome site which is already very
popular with visitors. 
Access for All – Findhorn, will complement these developments and enhance the
whole visitor experience.
Strategic Fit   Moray Routes: Bright Futures Objectives 1, 2 and 3.
RTIF Criteria.
The main report references several strategic plans, policies, and other relevant
reports, namely: Moray Core Paths Plan, amended (2018); Moray Economic
Strategy (2019-29); Moray Way Feasibility Study (2017); Local Development Plan
(2021); Planning for Real, Findhorn (2017); Coastal Erosion Study, Findhorn to
Roseisle (2002). 
What Action /
Projects are
Proposed 
The proposed works are shown as Projects 1-4 on the map above. Proposed
project work includes:
Project 1 – All Abilities Accessible Path
 Construct all abilities, graded path (90m in length) from car park near
proposed new toilet block to new all abilities viewing platform. Making use
of onsite materials to shape and form the base layer 
Project 2 – New Benches X4
 Constructed in similar style to those on the existing all abilities path along
the seashore in Findhorn (using existing nearby WW2 concrete structures
cut to half size with wooden seating) 
Project 3 – Triangular Sign
 With QR codes (updating information on tides; path access on the beach
front or inland; dolphin watch etc)
 New counter installed as part of FRTIF 4 funding (none currently at this
location)
Project 4 – All Abilities Viewing Platform
 Construct all abilities viewing platform with open views and seating –
making use of hard wearing, robust, future proofing material built in
sympathy to the marine environment  
 Counters and Signs are included in Project 1: Smart Destination and Project
2: Informed Destination projects.
Purpose  It is recognised by the local community that many people with accessibility
concerns are unable to get close to the beach and experience the view with all
their senses. A viewing platform will enable this and provide what is considered
locally to be a missing link along the trail. It will add to what is becoming a must
Page 209

Page 210

56 
visit part of the Moray Coastal Trail for everyone, as close by there is disabled
parking; a 21 space Aires camper van site; and a new toilet block with disabled
facilities soon to be built.
Indicative
Design  
Viewing Platform – indicative styles below: 
Benches – indicative style like those already in place along the accessible trail in
the village (making use of historic WW2 concrete defences):
Page 210

Page 211

57 
Triangular Signage – as per detail in Project 2: Informed Destination
Opportunities   Land required already in community ownership.
Findhorn Village Conservation Company have agreed in principle to ‘adopt’ any
installations to secure  good use of public funds in the long term. 
Constraints   There are no known constraints other than acquiring the necessary planning
consents, which is not expected to be an issue.
Indicative
Capital Costs 
Inclusive of indicative capital costs, project management and professional fees:
Project Cost
Accessible Path (90m) £20,000
Accessible Viewing Platform £25,000
Benches x4 £4,000
Sub Total £49,000
Contingency at 25% £12,250
TOTAL £61,250
TOTAL + VAT (20%) £73,500 
Potential
Delivery
Agents   
Findhorn Village Conservation Company has agreed to project manage any
procurement and installation of facilities. 
Potential
Sources of
Match Funding
and Revenue
Streams   
 Moray Council match funding from capital budget (subject to approval
from the relevant committee)
 Moray Routes Infrastructure Fund
 Just Transition Funding
 The community has a strong track record of local fund raising and
acquiring funding from various sources (see additional comments section
below).
 The community developed an Aires Motorhome site (21 positions, Wi-Fi
enabled) in 2021, which is already very popular and raising significant
levels of income (see figures below):
 Motorhome year one 26 May to 31 December 2021
Page 211

Page 212

58 
Number of bookings: 1573 (1060 for 1 night and 513 for 2 nights)
Number of nights: 2086 
Gross card payment income: £35,827
 Motorhome year two 1 January to 5 September 2022
Number of bookings: 1532 (1059 for 1 night and 473 for 2 nights)
Number of nights: 2005
Gross card payment income: £36,022 (includes future bookings)
 The community plans to introduce car park charging on the West car park.
Based on figures from September to December 2021, gross car park
income has the potential to deliver circa £46,500 per year.
 They also have plans to introduce a coffee van at East car park in 2023,
which will secure income from a private enterprise. 
Timetable for
Delivery   
The community is well positioned to develop these works as part of the next phase
of works in the Findhorn area and as part of the Moray Coastal Trail.  Any
necessary planning permissions would be sought from Moray Council, but this is
not considered to be time limiting. As such the project could be phased to start in
2023.  
Monitoring and
Evaluation  
 The community maintains records of visitor numbers using their car parks
and accessing their facilities, for example, Aires Motorhome Park. 
 They recognise the lack of counters in the area, and this has been
addressed as part of RTIF 4 funding and counters will be installed in 2022.
This will also form part of a wider strategic bid to RTIF5 by Moray Council.
 Increased visitor revenues
 WalkHighlands responses  
Additional
Comments  
Strong community presence with a positive track record of delivery: 
Aires - £108k in 2022. Delivered and revenue generating 
Toilets through RTIF4 – work started in September 2022 with planning permission
granted for second block
All abilities path along Findhorn seafront - £160k successfully delivered 
Community sees potential gap with all abilities access to sea views from car park
(happy to include viewpoint, access path, benches, and signage as part of their
current asset register). The land required is already in community ownership. 
Page 212

Page 213

59 
Project 4: Venture up the Hill – Tomintoul Spur
Site
Description 
The Tomintoul Spur is a branch of the Speyside Way heading up over the moorland
from Cragganmore to the high village of Tomintoul. It covers 24km, with the first
4.5km following roadside verges, including the busy and fast A85. From the small car
park at Auldich, the path climbs up over the moor offering stunning panoramic views
back over the glen and down towards Glenlivet. 
Page 213

Page 214

60 
Strategic Fit   Moray Routes Bright Futures Objectives 1, 2 and 3.
RTIF Criteria.
The main report also references several strategic plans, policies, and other relevant
reports, namely: Moray Core Paths Plan (amended 2018); Moray Economic Strategy
(2019-2022); Climate Change Strategy (2020-2030). 
What Action /
Projects are
Proposed 
The proposed works are shown as Projects 1-10 on the map above. Proposed project
work includes:
Project 1 – Informal Crossing where B9137 meets A95
 This has been discussed in detail with Transport Scotland, who are keen to
support tourism and active travel and have budgets in place to develop this.
This project is currently with Transport Scotland budget holders and Amey
(Transport Scotland’s new, recently appointed Operating Company in their
NE Unit) for their consideration. Amey’s Draft 1 and 3 year programmes are
due mid-November 2022, after which Transport Scotland will be better able
to advise if this scheme has been added to their works programmes.   
Projects 2,3,4 – New Safe Path alongside A95
 Construct new path along grass verge from A95 crossing to entrance to
Delnashaugh Hotel.
This has been discussed in detail with Ballindalloch Estate and Transport
Scotland. This section of the route is currently with Transport Scotland
budget holders and Amey (Transport Scotland’s new, recently appointed
Operating Company in their NE Unit) for their consideration. Amey’s Draft 1
and 3 year programmes are due mid-November 2022, after which Transport
Scotland will be better able to advise if this scheme has been added to their
works programmes.   
Project 5 – Develop old access road behind hotel
 Scrape 100m of old road to create safe and accessible path between A95 and
Delnashaugh hotel
Project 6 – Informal Crossing of B9008
 Create a new informal crossing point on B9008 where the path connects
from the old road and links to the B9008
Project 7 – New Safe Path 
 Create a new path on the grass verge of the B9008 from the informal
crossing to the entrance of the tarmac track to Auldich car park.
This has been discussed in detail with Moray Council and, should this project
be awarded RTIF funding, a detailed engineering scope and costings will be
prepared.
Project 8 – Restore Auldich Car Park and Interpretation
 Use existing materials to restore the car park 
Page 214

Page 215

61 
Project 9 – Path Works
 Improve path access in several locations up to proposed new viewpoint
Project 10 – New Viewpoint
 Construct new viewing platform.
 Mid Route Hub interpretation has been included in Project 2: Informed
Destination.
Purpose  To enhance the overall experience of the user by transforming the first 4.5km of the
route from Cragganmore to Auldich car park, thus creating a safe, accessible, and
enjoyable experience. 
To provide better connectivity locally to the hotel, shop, Ballindalloch Distillery, and
Lagmore Café, thus improving services for local people and for visitors to the area,
many of whom may then stay an additional night with the obvious economic
benefits that will bring to the area.
To enable a wider range of users to experience a remote place as they ‘venture up
the hill’ in search of the promoted viewpoint. As such it will capture the imagination
of the occasional walker and families to go that bit further on their walk. People can
choose to continue all the way through to Tomintoul (and the dedicated walker will
do this); but the opportunity to experience remoteness in relative safety will appeal
to a wide range of people.
Indicative
Designs
Informal Crossing of A95
Design to be prepared by Transport Scotland (Amey) 
Path alongside A95
Design to be prepared by Transport Scotland (Amey) 
Path alongside B9008
Design and costings will be prepared by Moray Council, should this project be
awarded RTIF5 funding.
Path works over the hill to new viewpoint
Making use of materials recovered from ‘borrow’ pits on site to improve the overall
surface of the path.
Viewpoint
Using materials drawn from the local area to create a simple and effective viewing
platform that creates both a resting place and a shelter, whilst delivering stunning,
panoramic views. Interpretation of the local area will add an additional sense of
place and purpose.
Similar in style to the image shown below:
Page 215

Page 216

62 
Opportunities   The creation of such a viewpoint (located at point 10 on the map above) will
encourage a wider cross section of people to ‘venture up the hill’ to experience a
sense of remoteness and wildness yet not that far from the perceived comforts of
the facilities down the valley. As such it will capture the imagination of the
occasional walker and families to go that bit further on their walk. People can choose
to continue all the way through to Tomintoul (and the dedicated walker will do this),
but the opportunity to experience remoteness in relative safety will appeal to a wide
range of people, many of whom may then stay an additional night with the
additional economic benefits that will bring to the area. The aim is that people will
want to come here for this view.
Glenlivet and Inveravon Community Association suggested an alternative route
(along the river Avon from Cragganmore to the old Bridge of Avon, then up through
the trees to link with the track to Tommore and then a new path to Knocknasalg on
to the track to Auldich car park). However, the clear belief held by the Estate and the
basis for its support is that the route described for this project is, for several quite
different reasons, the best option. 
Constraints   Planning permissions will be required but this is not considered to be a major
constraint
Transport Scotland – are keen to support tourism and active travel and have budgets
in place to develop this. This project is currently with Transport Scotland budget
holders and Amey (Transport Scotland’s new, recently appointed Operating
Company in their NE Unit) for their consideration. Amey’s Draft 1 and 3 year
programmes are due mid-November 2022, after which Transport Scotland will be
better able to advise if this scheme has been added to their works programmes.  
Indicative
Capital Costs 
Inclusive of indicative capital costs, project management and professional fees:
Project Cost
Informal crossing of A95 £10,000 estimate (TBC by
Transport Scotland)
New safe path alongside A95 £125,000 - £165,000 estimate
(TBC by Transport Scotland)
Scrape old road path (100m) £2,000
Informal crossing of B9008 £10,000
Page 216

Page 217

63 
New safe path alongside B9008
(1050m)
£100,000 estimate (TBC by
Moray Council following
engineering scope)
Engineering scope for new
path alongside B9008
£2,000
Restore Auldich Car Park £10,000
Path works at various locations
(1500m)
£25,000
New viewpoint, grouse butt
style plus interpretation
£15,000
Sub Total £164,000 (not including
Transport Scotland costs)
Contingency at 25% £41,000
TOTAL £205,000
TOTAL + VAT (20%) £246,000 
Potential
Delivery
Agents   
Amey will complete the work alongside the A95 on behalf of Transport Scotland, as
Transport Scotland’s contribution to this project 9 (subject to final agreement from
Transport Scotland).
Specialist contractors will be appointed by Moray Council to carry out the path work
alongside the B9008; path work over the hill to the proposed viewpoint; and
construction of the new viewpoint.
Potential
Sources of
Match Funding
and Revenue
Streams   
 Moray Council match funding from capital budget (subject to approval from
the relevant committee)
 Moray Routes Infrastructure Fund
 Just Transition Funding
 Transport Scotland – £value of capital work
 Ballindalloch Estate – gift of land strip alongside B9008
 Crown Estate Scotland
 Tomintoul & Glenlivet Development Trust – have offered in-kind
contribution of staff time to get the project established
 EDF Renewables Dorenell Wind Farm Community Benefit Fund – up to a
maximum of £30,000 per year can be accessed by Glenlivet & Inveravon
Community Association 
Timetable for
Delivery   
This project is best delivered in 2024/25 to fit with Transport Scotland’s advanced
works programme (should this be agreed by Transport Scotland in November 2022)
Monitoring
and
Evaluation  
 Increased footfall
 Increased visitor revenues 
 WalkHighlands responses   
Page 217

Page 218

64 
Project 5: Link to the Trails - Dufftown Spur
Site
Description 
The Dufftown Spur is a flat, well used, old railway line linking the settlements of
Craigellachie and Dufftown. The route contains two major river rail crossings and a
number of other rail road crossings. The section of the route requiring extensive
Page 218

Page 219

65 
work runs for a distance of some 3.25km from Craigellechie to the railway sidings on
the outskirts of Dufftown.
Craigellachie is positioned on the Speyside Way and has developed into an essential
tourism, leisure, and active travel route. It also acts as a critical Tourism Hub for the
area, providing direct access to the Rothes Way, Dufftown Spur, and the Isla Way.
Strategic Fit   Moray Routes: Bright Futures Objectives 1, 2 and 3.
RTIF Criteria.
The main report references several strategic plans, policies, and other relevant
reports, namely: Moray Core Paths Plan, amended (2018); Moray Economic
Strategy, (2019-29); Moray Council Active Travel Strategy (2022-27); Moray Local
Development Plan (2021); Planning for Real (2015); Dufftown & District Community
Action Plan (2021); Cycling Survey (2019) 
What Action/
Projects are
Proposed 
The proposed works are shown as Projects 1-9 on the map above. The works occur
along the length of the Dufftown Spur (7.5km connecting Craigellachie and
Dufftown), recognising that the final 1.5km into Dufftown runs alongside the
A941. Proposed project work includes:
Project 1 – River Fiddich Bridge 
 Cut tree growth
 Mend scouring at river level
 Mend any undermined damage to abutments/ piers 
Projects 2,3,6 – Cuttings
 Remove 3 sections of overhanging trees causing damage to banks and H&S
hazard to the public (700m in total, including both sides of the
embankments).  
Projects 4,5 – Newton Bridge 
 Cut tree growth
 Mend scouring at river level
 Mend any undermined damage to abutments/ piers
 Repair railings and path bridge layer
 Install new safety fencing  
Project 7 – Landslide 1
 Construct new 15-20m steel decking (min 2m width) with concrete
abutments and concrete sleepers supporting underneath
 Move path 1m closer to upslope side
 Add secure side railings
 Install secure fencing on downslope side
Project 8 – Landslide 2
 Clear path and upslope area with digger
 Install gabion baskets to secure the upslope area (10m x 2 rows)
Page 219

Page 220

66 
 Use dumper truck to carry 40 loads of stone to the site. 
Project 9 – Path Works
 Path scrape and fillings (3250m) 
 Improve drainage where required 
 Counters are included in Project 1:  Smart Destination, and Tourism Hubs in
Project 2: Informed Destination.
Purpose  This section of old railway line has become an essential tourism, leisure, and active
travel route connecting Craigellachie and Dufftown. Craigellachie is positioned on
the Speyside Way and acts as a critical Tourism Hub for the area, providing direct
access to the Rothes Way, Dufftown Spur, and the Isla Way. 
Works will secure existing land slips and provide a safe route. Maintenance of
Fiddich bridge and Newton bridge, together with enhancements to existing path
surfaces, will provide long-term security of public access. 
It will connect into the existing Speyside Way Low Carbon Hub, linking additional
communities in Speyside via an active travel corridor.
It will complement investment through the MGD Housing Mix project to provide
new affordable homes in the area.
Indicative
Design  
Restorative work on both major river bridges
Drone coverage, as part of this project, has indicated a significant build-up of
invasive vegetation around the abutments and structure of both bridges. In our
experience this has the potential to undermine key infrastructure. Our visual
inspection, as part of our survey work on this project, also concluded there was an
urgent need for a comprehensive inspection of both bridges and Moray Council
intends to commission this at the earliest opportunity. 
Landslip 1
Moray Council intends to commission an engineering report on the best way to
resolve this. There is the potential for this type of problem to be exacerbated by
climate change driven weather events. 
A ‘bridge’ design similar in style to the section of ramp (1) shown in the example
below from Fort William, would probably work well. 
Page 220

Page 221

67 
Landslip 2
Installation of 2 rows of gabion baskets on the upslope side. 
Path Works
Scrape and reuse existing materials where possible. 
25mm quarry dust top layer.   
Opportunities  The path is in the ownership of Moray Council and therefore does not present any
known legal or ownership issues.
The route is popular with walkers and cyclists. In 2019, prior to setting up  a
Community Bike Hub in 2021 in Dufftown (for e-bikes and push bikes), a local
businessman carried out a cycling survey. The results showed that 66% of those
surveyed wanted off road cycling for tourism, leisure, and active travel purposes
with the Dufftown Spur providing such a route. Of those surveyed, some 50% were
tourists. 
Ongoing monitoring of renters by the Community Bike Hub shows that 70% of the
renters have come back saying they went on the Dufftown Spur and/or joined up
with the Speyside Way on from Craigellachie.
Number of bike renters over the past two years has more than doubled:
Jan – Aug 2022 79
Jan – Dec 2021 36 
Constraints The path has several historic railway bridges along its length, including the two
largest of these (River Fiddich and Newton Bridges). The main report details the
considerable financial burden this places on Moray Council and why the works
proposed here should not be considered as simply routine maintenance.
Planning permission may be required.
Indicative
Capital Costs
Indicative capital costs, project management and professional fees: 
Project  Cost
1
Page 221

Page 222

68 
River Fiddich Bridge £50,000
Newton Bridge £50,000
Landslip 1 – steel structure £125,000 estimate (TBC by
Moray Council following
commission of engineering
report)
Engineering report on steel
structure – should this bid to
RTF5 be successful 
£2,000
Landslip 2 – gabion baskets £15,000
Cuttings (£20-£25/linear m) £17,000
Path works (3,250m x £8/m) £26,000
Drainage Works £15,000
Sub Total £300,000
Contingency at 25% £75,000
TOTAL £375,000
TOTAL + VAT (20%) £450,000 
Potential
Delivery
Agents
Planning permission likely to be required for the steel structure at landslip 1
Specialist contractors will be required for all aspects of these works and as such the
works will need to be phased, with the bridge and landslip works to be completed
first.
Ongoing site monitoring and any routine maintenance work will be delivered by
Moray Council
Potential
Sources of
Match Funding
and Revenue
Streams   
 Moray Council match funding from capital budget (subject to approval from
the relevant committee)
 Moray Routes Infrastructure Fund
 Just Transition Funding
 Dufftown & District Community Association can apply for up to £30k per
year from the EDF Renewables Dorenell Wind Farm Community Benefit
Fund
 William Grant Foundation
 Ena Baxter Foundation
 Paths for All
 Moray Council also have access to the Dorenell Wind Farm Fund and have
been awarded £50k per year (for 25 years) for path works.
 UKSPF Intervention Code (bid for match funding by Moray Council):
Improvements to the natural environment and green and open space which
could include community gardens, watercourses, and embankments, along
with incorporating natural features into wider public spaces.
Support for linking communities together and with employment
opportunities with a focus on decarbonisation. 
Timetable for
Delivery
Propose that this project be delivered in 2024/25 to give time for tendering of the
various works and planning consents where required.  
Monitoring
and Evaluation
 Project 1: Smart Destination and Project 2: Informed Destination will seek
funding to develop Tourism Hubs and install counters in key strategic
Page 222

Page 223

69 
locations. These will be essential in capturing essential statistical
information in a consistent, accurate and meaningful way. 
 There is at present no counter on the Dufftown Spur. Statistics are captured
for bike hires (see section above entitled ‘Opportunities’) plus an abundance
of anecdotal evidence of consistent use by locals and tourists.
 Increased footfall
 Increased visitor revenues
 WalkHighlands responses   
Project 6: Distilleries Trail – Rothes Way
Page 223

Page 224

70 
Site
Description 
The Rothes Way is a new multi-use route that the community of Rothes is seeking to
establish, linking Rothes with Craigellachie. The route, for the most part, follows the
line of the Morayshire railway and will provide a safe, scenic route for all users,
including school children. It avoids the busy main road between the two settlements.
It will provide a direct link into the centre of Rothes from the established Speyside
Way where it passes Craigellachie and Aberlour, thus enabling visitors to gain easy
access to the 3 whisky distilleries in Rothes, crossing over the iconic Telford bridge
enroute.  
Strategic Fit   Moray Routes: Bright Futures Objectives 1, 2 and 3.
Page 224

Page 225

71 
RTIF Criteria.
The main report references several strategic plans, policies, and other relevant
reports, namely: Moray Way Feasibility Study (2017); Moray Core Paths Plan,
amended (2018); Moray Economic Strategy (2019-29); Moray Council Active Travel
Strategy (2022-27); Rothes to Craigellachie Route Study (2018). 
What Action /
Projects are
Proposed 
The proposed works are shown as projects 1-5 on the map above. Proposed project
work includes:
Section 1 – complete 
Section 2 – partially complete (rerouting of part)
Section 3 – not started
Section 4 – not started (terminus into Rothes)
Sections 2 and 3
 Project 1 – Access to Telford Bridge
Clearing and improving old tarmac path to layby adjacent to A941 
 Project 2 – Construction of an Accessible Route  
From crossing point on B9102 to link with the old tarmac track. 
Details of the route to be clarified in discussion with landowner, construction
engineer, and trustees. 
 Project 3 – Informal Road crossings x2
Details of road crossings to be clarified through discussions with Moray
Council Roads team 
Section 4
 Project 4 – Construction of an accessible path extending the current works
on Section 1 into the centre of Rothes along the old railway line.
To be constructed to the same standard as sections 1-3: 
500m x 2m wide, 100mm type 1 base, 25mm quarry dust top layer.    
Details of the route have still to be clarified through discussion with Moray
Council as landowner, construction engineer, and trustees. 
 Project 5 – Triangular Sign and Interpretation at Terminus in Rothes
See detail in Project 1: Smart Destination and Project 2: Informed
Destination
Purposes  To provide outdoor recreational activities for the local community and its visitors by:
 establishing a recognised, safe, and accessible walking and cycling route
between Rothes and Craigellachie to be known as the Rothes Way.
 promoting those sections of the Rothes Way suitable for family groups and
less able users, including those using mobility scooters or adaptive bikes.
Page 225

Page 226

72 
 organising and supporting public events using the Rothes Way for
recreational or sporting events
To advance citizenship and community development by:
 working with landowners and volunteers from the local community to
maintain, improve and promote the Rothes Way and the environment
alongside
 promoting the use of the Rothes Way as a strategic route for active travel
and tourism
To advance heritage and education by informing the public about the natural
environment and the historical significance of the former Morayshire Railway 
Indicative
Design  
Indicative designs have been prepared for Section 3 by upgrading of existing tarmac
or creating new path along verge to same standard as sections 1 and 2 (200m x 2m
wide, 100mm type 1 base and 25mm quarry dust top layer). 
Section 4, Terminus into Rothes, will be prepared to the same standards following
further discussions with Moray Council. 
Opportunities   By providing a link with the popular Speyside Way, the creation of the Rothes Way
will provide increased opportunities for active travel and promoting tourism in
Rothes. Access to the 3 local distilleries will be enhanced for tourists and in future
could be linked to a walking, cycling, canoeing trail linking with the existing Moray
Whisky Trail.
Information boards will be installed informing path users of features of the natural
environment, links to local industries (whisky distilling and salmon fishing) and the
historical significance of the former railway line and the Telford Bridge at
Craigellachie.
There is the potential to further promote tourism by the creation of a café and
possible tourist hub in the former Rothes FC Social Club adjacent to the terminus of
the route in Rothes Square.  The property has been purchased by a local
businessman who has plans to develop the property in 2023. 
Constraints   Planning permission required for Section 4, but this is unlikely to cause a problem.
Details of Section 4 have still to be clarified through discussion with Moray Council
but are not expected to cause any serious concerns.
The completion of sections 2 and 3 depends on written agreements from three
landowners.  Two landowners have already given approval in writing.  However
written approval  for completion of part of section 2 has still to be obtained.  RWA
trustees are seeking legal advice to take this forward and have drafted a letter
setting out what they consider the basis for a formal agreement.  
Should they be unable to reach an agreement, they will consider the option of a
Community Right to Buy (CRtB).  They have taken guidance from Community
Page 226

Page 227

73 
Ownership Support Service (COSS) on the procedures and have revised their
constitution to be compliant with the CRtB should that option become necessary.
They have also considered a Compulsory Path Delineation Order (CPDO). However,
they are working hard with the landowner to avoid either of these options.
Section 4 is owned by Moray Council and Rothes Way Association have indicated
they are unable to take on the development of this section. 
Indicative
Capital Costs 
Inclusive of indicative capital costs, project management and professional fees:
Project Cost
Path construction – section 3  £15,000 - £20,000 estimate
(TBC by RWA)
Informal crossings x2 £20,000
Access to Telford Bridge £5,000
Path construction – terminus
into Rothes (£8/m2 x 500m)
£8,000
Sub Total £48,000 - £53,000
Contingency at 25% £12,000 – 13,250
TOTAL £60,000 - £66,250
TOTAL + VAT (20%) £72,000 - £79,500 
Potential
Delivery
Agents   
Specialist contractors will be employed to plan, design and construct Sections 3 and
4
Moray Council Road’s department will be involved in planning and design of the two
road crossings on Section 3 and the path works on Section 4
Potential
Sources of
Match Funding
and Revenue
Streams   
 Moray Council match funding from capital budget (subject to approval from
the relevant committee)
 Moray Routes Infrastructure Fund
 Just Transition Funding
 To date RWA has been highly successful in raising funds through donations
from local businesses, local and national funders, and local events planned
by the fund raising team (see list below). Total income banked to date is
£75,615.95 and total expenditure is £40,265.42 (June 2022) for work thus far
on sections 1 and 2 only: 
Funding Sources
In kind support to build sections 1 and 2
Local fund raising activities
Charity pop up shop – matched by
Robertson Trust and Edrington
Cash donations from residents
Rothes Windfarm
Gordon & Ena Baxter Foundation
Berryburn Community Fund
Adam Family Foundation
Inver House Distilleries
Diageo
Page 227

Page 228

74 
Co-op Community Benefit Fund
Rothes Council
Moray Council
Money for Moray
Heritage Lottery Fund 
 Paths for All Grant provided funds for tools and equipment for the
maintenance team.  On-going fundraising will be required to meet any repair
costs. 
 RWA does not employ any paid staff. 
Timetable for
Delivery   
Key elements are:
1. Reaching formal agreement for completion of Section 2 (1-2 months)  / or
pursuing a CRtB or CPDO if agreement cannot be reached (3-5 years)
2. Planning and construction of Sections 2 and 3 (4 - 6 months)
3. Fundraising ongoing up to 5 years, depending on outcome of point 1
Monitoring
and
Evaluation  
 Increased footfall
 Increased visitor revenues
 Safe and accessible route between settlements
 WalkHighlands responses  
Page 228

Page 229

75 
Project 7 : Historic Connections – Dallas Dhu
Site
Description 
Dallas Dhu is a historic distillery dating back to Victorian times and is situated half a
mile south of Mannachie Avenue in Forres. It is currently in the care of Historic
Environment Scotland who maintain it as a museum open to the public. There is a
large car park and toilets on site with access on to the Dava Way. As such it is well
placed to attract visitors though currently the access is steep and difficult to
navigate for all abilities. 
Page 229

Page 230

76 
There has been significant new house building on the route between Dallas Dhu and
Forres with imminent plans for a further large housing development.  This project
proposes to create an all abilities access path up on the Dava Way from Dallas Dhu
and as such enhance the experience for visitors and people living in these
communities and nearby Forres.
Strategic Fit   Moray Routes: Bright Futures Objectives 1, 2 and 3.
RTIF Criteria.
The main report references several strategic plans, policies, and other relevant
reports, namely: Moray Core Paths Plan, amended (2018); Moray Economic Strategy
(2019-29); Moray Local Development Plan (2021). 
What Action /
Projects are
Proposed 
The proposed works are shown as Projects 1-3 on the map above. Proposed project
work includes:
Project 1 – All Abilities Access
 Re-engineer access from Dallas Dhu car park via all abilities path up to Dava
Way.  
Project 2 – New Triangular Sign at Sanquhar Loch
 Included in Project 2: Informed Destination. Inviting the public to consider
an alternative off road route back to the centre of Forres.
Project 3 – Counters
 Included in Project 1: Smart Destination.
Purpose  To provide outdoor recreation facilities and activities for the local community and
its visitors by:
- establishing a recognised walking and cycling route between Forres and
Grantown-on-Spey.
- promoting those sections of the Dava Way suitable for equestrians or
accessible by mobility scooter.
- organising and supporting public events using the Dava Way for recreational
or sporting activities.
To advance citizenship and community development by:
- working with landowners, land occupiers and volunteers from the local
community to maintain and improve the route and the environment
alongside.
- promoting the use of the Dava Way as a strategic route for active travel. 
To advance heritage and education by:
- restoring and preserving Highland Railway buildings and artefacts along the
route.
Page 230

Page 231

77 
- informing the public about the natural environment and heritage, the
influence of the Highland Railway and the history connected with the local
communities.
Indicative
Design  
Planning application to be submitted to Moray Council. 
Designs to be confirmed by Dava Way Association.
Opportunities   The Dava Way Association has a positive history of project delivery with the ability
to manage this project to completion. They also have access to a positive and able
group of volunteers who they proactively manage on a regular basis.
Constraints   Historic Environment Scotland – awaiting response but not expected to cause a
problem.
Planning permission required from Moray Council but not expected to cause a
problem.  
Indicative
Capital Costs 
Inclusive of capital costs, project management and professional fees: 
Project Cost
New all abilities connecting
path
£75,000
Contingency at 25% £18,750
TOTAL £93,750
TOTAL + VAT (20%) £112,500 
Potential
Delivery
Agents   
Specialist contractors appointed and managed by Dava Way Association
Potential
Sources of
Match Funding
and Revenue
Streams   
 Moray Council match funding from capital budget (subject to approval from
the relevant committee)
 Moray Routes Infrastructure Fund
 Just Transition Funding
 Baxter Foundation
 Adam Trust 
 Altyre Estate 
Timetable for
Delivery   
Deliverable in 2023/24
Monitoring
and
Evaluation  
 Route counters
 Increased footfall
 Increased visitor revenues
 Social media posts 
Page 231

Page 232

78 
Project 8: Coastal Connections – Spey Bay to Buckie
Site
Description 
Page 232

Page 233

79 
This unique section of the Moray Routes combines the Moray Coastal Trail and the
Speyside Way. Section 1 weaves its way through Dallachy Wood and has the
potential to provide a wonderful link via the old railway line to Portgordon and then
beyond to Buckie, with its amazing colony of Moray Firth seals enroute
Strategic Fit   Moray Routes: Bright Futures Objectives 1, 2 and 3.
RTIF Criteria.
The main report references several strategic plans, policies, and other relevant
reports, namely: Moray Core Paths Plan, amended (2018); Moray Economic
Strategy (2019-29); Moray Council Active Travel Strategy (2022-27); Moray Local
Development Plan (2021). 
What Action/
Projects are
Proposed 
The proposed works are shown as Projects 1-5 on the map above. Proposed project
work includes:
Project 1 – From Spey Bay through Dallachy Wood
 Works on tree clearance for this section now scheduled by Crown Estate
Scotland. This will ensure improved access from Spey Bay to Portgordon
 Create an all abilities path through this section, connecting with the section
along the old railway line into Portgordon
Project 2 – Old Railway Line
 Reinstate an all abilities path from Dallachy Wood, along the length of old
railway line, into Portgordon
Project 3 – Bridge Works 
 Secure base and railings
Project 4 – Counters and Signage
 To be delivered as part of Project 1: Smart Destination and Project 2:
Informed Destination 
Project 5 – From Portgordon to Buckie
 Create an all abilities path through this section, providing an accessible
connection between the two settlements and giving access to the marine
wildlife of the area.
Purpose  To create an all abilities path connecting local people and visitors between Spey Bay,
Portgordon and Buckie
Indicative
design  
All abilities path from Spey Bay through Dallachy Wood 
 In terms of the future management of Dallachy woods by Crown Estate –
there are currently no firm plans to undertake any significant harvesting of
the woodland. Planned works will be predominantly focussed on the
clearance of windblown trees that fall across the path (as required) and
monitoring trees adjacent to (within falling distance of the path). An estate
wide tree inspection was undertaken in summer 2021 with a
Page 233

Page 234

80 
recommendation to remove some (highest risk) of the dead trees adjacent
to the path. This work was commissioned in October 2022
 Crown Estate are happy to work in partnership with Moray Council to create
a new all abilities trail through the wood, thus connecting to the proposed
improved section along the 1.5km of old railway line into Portgordon
Standard:
Dug at least 50mm deep and lined with geotextile sheet
Lay and roll Type 1 – 100mm deep
Lay and roll whinstone or granite dust – 25mm deep x 2m width
All abilities path along the old railway line into Portgordon
 Scrape top where required and set aside
 Redistribute existing stone material base from old railway
 Lay and compact whinstone or granite dust – 25mm depth x 2m width
All abilities path from Portgordon to Buckie
 Redistribute existing stone material
 Lay and roll whinstone or granite dust – 25mm deep x 2m width 
Opportunities   The old railway line from Portgordon to where the path enters Dallachy Wood is
owned by Moray Council thus offering no obstruction in terms of timescales and
delivery of this section of the works.
There is an opportunity to improve access for everyone from Buckie, through
Portgordon, and all the way to Spey Bay. This is a well-used route by local people,
and, through better promotion and improved access, this section could be more
widely promoted to visitors. It is currently a strategic gap in the routes network.
Connecting with an all abilities path on from Portgordon to Buckie creates an
opportunity for people to get close to marine wildlife (Grey Seal colony at
Portgordon) along this section of the coast. 
Portgordon Community Trust are in the process of creating a Community Hub and
are a willing partner in this project. The Community Hub has been developed
following the purchase of the Richmond Arms hotel, with support from Highlands &
Islands Enterprise and Crown Estate Scotland. The new Community Hub includes a
café with toilets, and future overnight accommodation is planned. Portgordon
Community Trust have also developed a community garden (growing food for the
café and community), which is being branded as a green sustainable demonstration
site and includes an underground rain water tank and solar power. The area boasts a
beautiful harbour which is also undergoing significant upgrading works, which all
adds to the charm for visitors. There is a BBQ and picnic benches nearby and a cycle
repair section. In addition, there is an EV charging point in the village and a village
shop 
Page 234

Page 235

81 
Constraints   The path through Dallachy Woods from Spey Bay will require ongoing maintenance,
which Crown Estate are committed to. 
An alternative route is available through the golf course should at any time the route
through Dallachy Woods be closed due to storm damage to the trees.
Indicative
Capital Costs 
Inclusive of indicative capital costs, project management and professional fees: 
Project Cost
Maintain open access through
Dallachy Wood
Cost being met by Crown
Estate Scotland
New access for all through
Dallachy Wood 
(£25/m2 x 1.5km)
£75,000
Improved access for all along
the old railway line
(£8/m2 x 1.5km)
£24,000
Improved access for all along
the coast from Portgordon to
Buckie
(£8/m2 x 1.5km)
£24,000
Footbridge works £2,000
Sub Total £125,000
Contingency at 25% £31,250
TOTAL £156,250
TOTAL + VAT (20%) £187,500 
Potential
Delivery
Agents   
Crown Estate Scotland has already tendered and appointed contractors for their tree
maintenance/ clearance works through Dallachy Woods. Moray Council will need to
appoint contractors to upgrade the old railway line and the section from Portgordon
to Buckie. The section through Dallachy Woods would be in partnership with Crown
Estate. 
Potential
Sources of
Match Funding
and Revenue
Streams   
 Moray Council match funding from capital budget (subject to approval from
the relevant committee)
 Moray Routes Infrastructure Fund
 Just Transition Funding
 Crown Estate Scotland would be prepared to consider a financial
contribution at the appropriate time
 Golf Club
 Portgordon Community Trust have successfully raised funding for several
projects. As such they have a positive track record of successfully generating
funding and are prepared to seek match funding for this project. Previous
funders/ grant sponsors include: 
Funding Sources
HIE – various sources
Beatrice Wind Fund
W.M.Grant
Page 235

Page 236

82 
Corra Foundation
Lennox Community Council
National Lottery
Mutch4less
Portgordon Theatre Group
tsi Moray
Community Land Fund
Arnold Clark Community Fund
Springfield
SSEN
CARES – Local Energy Scotland
Greenshoots
SLF 
Timetable for
Delivery   
Deliverable in 2023/24
Monitoring
and
Evaluation  
 Route counters
 Increased footfall
 Increased visitor revenues 
Page 236

Page 237

83 
13 Appendices
13.1 Appendix 1: Stakeholder Engagement Questionnaire on the draft Plan 
We are a group of independent consultants who have been commissioned by Moray Council to
prepare a Moray Routes Strategic Infrastructure Plan to support an application to Round 5 of the
Rural Tourism Infrastructure Fund. We have been in touch with you previously and we are seeking
your comments on the draft Plan. 
It is particularly important that you note the following before responding : 
 The Moray Routes Strategic Infrastructure Plan has been written and developed specifically
to satisfy criteria set down by the  Scottish Tourism Recovery Taskforce (STRT). The STRT are
responsible for ensuring that, following the Covid outbreak, a  tourism recovery plan is fully
coordinated with wider Scottish Government and other relevant sectoral recovery plans, and
with the national  tourism strategy Scotland Outlook 2030. The tourism priority in the Plan is
important and while Moray Routes are used extensively by residents; they are not the
primary focus. 
 Funding for the projects outlined in the Plan, if the application is successful, will come from
the Scottish Government’s Rural Tourism Infrastructure Fund (RTIF) Round 5. Funding
assistance could extend to 75% of identified costs with matching funds from a variety of
other sources including Moray Council.
 The RTIF is administered by Visit Scotland and this Plan will be set before the funding award
panel to demonstrate that there is a pipeline of projects. The RTIF Assessment Panel
includes  representatives of Scottish Government, Scottish Enterprise, Highlands & Islands
Enterprise, COSLA, NatureScot, Architecture and Design Scotland as well as
VisitScotland. The RTIF Round 5 is likely to be highly competitive with demand exceeding the
available funding.
 Moray Council were successful in their RTIF Round 4 application for facilities like toilets and
car parks, elsewhere on the Moray Routes network.  This Plan is intended to complement
the Round 4 investment through its focus on strategic gaps in the route network with
projects designed primarily to improve the visitor experience and make the Moray Routes
network more inclusive and easier to manage through use of technology. 
 Also likely is that of the six primary projects put forward, perhaps only two will be supported
by RTIF for detailed investigation to get them to ‘shovel ready’ status in 2023/24. Other
projects in the ‘pipeline’ may have to wait until  subsequent years to receive RTIF funding.
Equally, as we know, government funding will be squeezed in uncertain ways over the
coming years and guaranteeing support is not possible.  
 RTIF is primarily about projects that support the wider visitor interest, choices, and
experience making Moray a more attractive place to visit. Funding cannot support projects
which are led by the private sector, or which will directly benefit any private sector business
Page 237

Page 238

84 
or groups of businesses. Land and/or facilities receiving support should generally be owned
or on a long agreement through public bodies or constituted community groups 
Questionnaire on draft Moray Routes Strategic Infrastructure Plan
Questions Yes No Comments
1. Are you supportive of the rationale
and actions in the Plan and the
identified strategic gaps in the
Moray Routes network?     
2. In your opinion, does the Plan
address Responsible Tourism and
quality visitor experience  issues
on  the Moray Routes?   
3. In your opinion, does the Plan
support communities using the
Moray Routes to become more
resilient and able to better manage
tourism demands and develop new
local business opportunities?   
4. Are there any barriers or constraints
you feel the Plan should highlight? 
5. Are there any opportunities or
benefits you feel the Plan should
highlight? 
6. In principle, is your organisation
content to be listed in the Plan as: 
A delivery agent (commitment to at least
help in kind in getting the project
established) 
Supporting partner (commitment to
recording your support through
correspondence) 
An owning and managing agent, taking
responsibility for facility ownership and
maintenance, data collection etc over the
longer term   
Other – please state 
Page 238

Page 239

85
7. Any other comments on the Plan?
s
Page 239

Page 240

Page 240

Page 241

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 7 FEBRUARY 2023 
SUBJECT: INFORMATION REPORT:  LIST OF PROPERTY
TRANSACTIONS CONCLUDED UNDER DELEGATED
POWERS 
BY: DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT &
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of property transactions which have been dealt with
under delegated powers. 
1.2 This report is submitted to the Economic Development and Infrastructure
Services Committee in terms of Section III F (5) of the Council's Scheme of
Administration relating to industrial and commercial development. 
2. BACKGROUND 
2.1 In terms of the Council’s Scheme of Delegation, the Head of Housing and
Property has delegated authority to grant leases, licenses or other occupation
agreements of land and buildings for 25 years or less duration where the
initial rent does not exceed £35,000 per annum and sites on long term
building leases of up to 125 years duration where the initial rent does not
exceed £35,000 per annum. 
2.2 In terms of the Council’s Scheme of Delegation, the Head of Housing and
Property has delegated authority to conduct rent reviews and fix new rents. 
2.3 In terms of the Council’s Scheme of Delegation, the Head of Housing and
Property has delegated authority to grant wayleaves or servitudes over
Council owned property. 
2.4 In terms of the Council’s Scheme of Delegation, the Head of Housing and
Property has delegated authority to approve the sale of Council property
where the purchase price does not exceed £30,000, subject to liaison with
appropriate officials of the Council, and the ward members. 
2.5 In terms of the Council’s Scheme of Delegation, the Head of Housing and
Property has delegated authority to grant assignations of existing leases
where the terms of lease remain substantially unaltered and to authorise sub-
lets. 
Page 241

Page 242

2.6 In terms of the Council’s Scheme of Delegation, the Head of Housing and
Property has delegated authority to approve acquisitions of heritable property
up to a value of £50,000 where appropriate provisions have been made in the
Capital or Revenue Plan. 
3. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The proposals support the aim of delivering financial stability. 
(b) Policy and Legal
None. 
(c) Financial Implications
The transactions detailed in APPENDICES I, II, III and IV will generate
monies to the Council. 
There are monies allocated in the Capital Plan for the transaction
detailed in APPENDIX VI. 
(d) Risk Implications
None. 
(e) Staffing Implications
None. 
(f) Property
None. 
(g) Equalities/Socio Economic Impact
None. 
(h) Climate Change and Biodiversity Impacts  
None. 
(i) Consultations
None. 
4. CONCLUSION 
4.1 It is recommended that the Committee notes the 15 leases, 24 rent
reviews, 3 servitudes/wayleaves, 4 sales of ground, 1 assignation and 4
property acquisitions as set out in APPENDICES I, II, III, IV, V and VI. 
Author of Report: Stuart Beveridge, Asset Manager (Commercial Buildings)
Background Papers: 
Ref:   SPMAN-1285234812-1218 
Page 242

Page 243

APPENDIX I 
REPORT TO THE ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES COMMITTEE ON 7 FEBRUARY 2023 
LIST OF LEASES OF BUILDINGS AND SITES – SUBMITTED FOR NOTING 
1. Reference No. 
2. Officer’s Ints
1. Address 
2. Tenant
1. Building (m²) 
2. Site (Ha) 
1. Date of Entry 
2. Review Period
Rent Remarks
1. EL/1/208 
2. TIBA
1. 8 Chanonry Road South,
Elgin 
2. Education & Social Care
Service
1. 550sqm 
2. 0.15Ha
1. 25/7/22 
2. 3 years
£30,500 p.a. Permitted Use:  Internal
letting for temporary use
for corporate records
storage.
1. EL/5/271 
2. TIBA
1. Unit E Pinefield Business
Centre, Elgin 
2. Elgin & District Men’s
Shed (Charity
SC048460)
1. 91sqm 
2. 0.01Ha
1. 8/8/22 
2. 3 years
£6,900 p.a. Permitted Use:  For use as
a workshop & store in
connection with tenant’s
charitable purposes.
1. BK/1/222 
2. IAWA
1. 18 March Road East,
Buckie 
2. Richard Earsman, T/A
Pr3stige Tinting
1. 70sqm 
2. -
1. 16/8/22 
2. 3 years
£5,800 p.a. Permitted Use:  Car
detailing business. 
Page 243

Page 244

1. BK/660/4 
2. ALBU
1. The Buckie Drifter,
Freuchny Road, Buckie 
2. Moray Offshore
Windfarm (West) Ltd
1. 534.3sqm 
2. 0.0526Ha
1. 1/8/22 
2. 3 years
£25,000 p.a. Permitted Use:  Temporary
offices.  Tenant to
undertake works fitting out
subjects & doing fabric
repairs in exchange for a
rent free period to be
determined by the cost of
works.
1. EL/600/2 
2. ALBU
1. Field adjacent to
Oakview, Morriston
Road, Elgin 
2. Amanda Davidson
1. - 
2. 1.51Ha
1. 14/8/22 
2. 5 years
£400 p.a. Permitted Use:  Keeping of
bees & associated
meadows grass.
1. KE/3/266 
2. ALBU
1. Unit F Isla Bank Mills,
Keith 
2. Oakwood Cooperage Ltd
(SC596065)
1. 872sqm 
2. 0.2Ha
1. 18/4/22 
2. 3 years
£22,000 p.a. Permitted Use: 
Workshops & storage in
relation to cooperage &
barrel storage.
1. KE/1/222 
2. ALBU
1. Unit 2, 4 Westerton
Road South, Keith 
2. Lisa Henderson
1. 25sqm 
2. 0.003Ha
1. 10/10/22 
2. 3 years
£3,540 p.a. Permitted Use:  Florists
workshop, storage &
distribution (direct sales to
public prohibited). 
Page 244

Page 245

1. EL/1/225 
2. TIBA
1. Unit 5, 2 Chanonry Road
North, Elgin 
2. McConnachie Land &
Forestry Services Ltd
(SC590104)
1. 25sqm 
2. -
1. 1/10/22 
2. 3 years
£3,960 p.a. +
VAT
Permitted Use:  Office in
connection with the
tenant’s business as a
forestry & woodland
consultancy contracting
service.
1. KE/555/13 
2. CQ
1. St Rufus Park, Keith 
2. Springfield Properties
1. - 
2. 0.34Ha
1. 27/6/22 
2. -
£3,632.80 Permitted Use:  Temporary
site compound in relation
to install of Scottish Water
waste water storage
infrastructure.
1. CL/GEN 
2. CQ
1. Land adjacent to Cullen
Viaduct, Cullen Links
Car Park, Cullen 
2. Scottish Gas Networks
1. - 
2. 0.004Ha
1. 22/8/22 
2. -
£200 Permitted Use:  Temporary
site compound in relation
to maintenance of existing
gas main water-crossing. 
1. EL/GEN 
2. CQ
1. 111 Duncan Drive, Elgin 
2. Mr & Mrs G McIntosh
1. - 
2. 0.002Ha
1. 18/7/22 
2. -
£325 Permitted Use:  Temporary
site compound in relation
to residential garage
construction at adjacent
property. 
Page 245

Page 246

1. BK/482/5 
2. SB
1. Portessie Nursery
School, School Road,
Buckie 
2. Portessie Playgroup
1. 68sqm 
2. -
1. 2/8/21 
2. 
£660 p.a. Permitted Use:  Playgroup.
Stepped/phased rent over
6 year lease term.
1. EL/660/10 
2. IAWA
1. 17 High Street, Elgin 
2. Morag Martin
1. 95.6sqm 
2. 0.01Ha
1. 29/10/22 
2. 
£0 Permitted Use:  Used as a
pop up shop for licensee’s
photography business. 
License terminated on
26/11/22.
1. FR/4/206 
2. IAWA
1. 4 Waterford Circle,
Forres 
2. Biomatrix Water
Solutions Ltd
1. 70sqm 
2. -
1. 25/11/22 
2. 3 years
£7,500 p.a. Permitted Use: 
Manufacture & storage of
equipment used in water
treatment & habitat
creation & ancillary uses.
1. PK/482/2 
2. SB
1. Portknockie Nursery,
Portknockie Primary
School, King Edward
Terrace, Portknockie 
2. Portknockie Nursery
1. 204sqm 
2. -
1. 2/8/21 
2. 6 years
£348 p.a. Permitted Use:  Nursery.
Stepped/phased rent over
6 year lease term. 
Page 246

Page 247

APPENDIX II
REPORT TO THE ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES COMMITTEE ON 7 FEBRUARY 2023 
LIST OF RENT REVIEWS OF BUILDINGS AND SITES - SUBMITTED FOR NOTING 
1. Ref No.
2. Valuer’s Ints.
1. Address
2. Tenant
1. Building (m²) 
2. Site (Ha)
1. Date of Entry
2. Review Period
Interval
1. Previous Rent
2. New Rent
Remarks
1. FR/1/213 
2. IAWA
1. 1A Greshop Road, Forres 
2. William McLennan
1. - 
2. 0.15Ha
1. 1/6/17 
2. 5 years
1. £4,800 p.a. 
2. £5,250 p.a.
Permitted Use:
Car mechanics
workshop.
1. MO/1/103 
2. IAWA
1. 9 Mosstodloch Industrial
Estate, Mosstodloch 
2. Taylor Engineering
1. - 
2. 0.17Ha
1. 11/3/19 
2. 3 years
1. £5,500 p.a. 
2. £6,350 p.a.
Permitted Use:
Yard for engineering
business.
1. MO/1/100 
2. IAWA
1. 5 Mosstodloch Industrial
Estate, Mosstodloch 
2. Taylor Engineering
1. - 
2. 0.12Ha
1. 15/5/77 
2. 5 years
1. £1,650 p.a. 
2. £1,825 p.a.
Permitted Use:
General engineering
works.
1. FR/4/210 
2. IAWA
1. 17 Waterford Circle, Forres 
2. Aaron Stuart
1. - 
2. 0.11Ha
1. 1/10/16 
2. 5 years
1. £3,000 p.a. 
2. £3,635 p.a.
Permitted Use:
Yard for manufacture
& storage of precast
concrete products.
Page 247

Page 248

1. EL/1/206 
2. TIBA
1. 8 Chanonry Spur, Elgin 
2. AM Details Ltd (SC495779)
1. 86.2sqm 
2. -
1. 4/4/07 
2. 3 years
1. £5,940 p.a. +
VAT 
2. £6,750 p.a. +
VAT
Permitted Use:
Manufacture, storage
& distribution of car
care products.
1. EL/5/105 
2. TIBA
1. Unit 5 Parade Spur North, Elgin 
2. Squeaky Clean WC Ltd
(SC582611)
1. - 
2. 0.02Ha
1. 26/6/87 
2. 5 years
1. £820 p.a. 
2. £920 p.a.
Permitted Use:
Workshop, store &
yard in connection with
tenant’s window
cleaning business.
1. HN/750/13 
2. ALBU
1. Site 21A & B Hopeman
Harbour, Hopeman 
2. Martin South
1. 46sqm 
2. 0.004Ha
1. 1/9/16 
2. 3 years
1. £835 p.a. 
2. £1,000 p.a.
Permitted Use:
Private storage.
1. BD/1/202 
2. ALBU
1. Unit 3 Burghead Harbour,
Burghead 
2. David Erker
1. 65sqm 
2. 0.02Ha
1. 24/6/19 
2. 3 years
1. £3,500 p.a. 
2. £4,330 p.a.
Permitted Use:
Light metal fabrication
& engineering.
1. EL/8/135 
2. TIBA
1. Unit 35 Tyock Industrial Estate,
Elgin 
2. Edward Gordon Laing
1. - 
2. 0.03Ha
1. 29/8/97 
2. 5 years
1. £1,100 p.a. 
2. £1,465 p.a.
Permitted Use:
Workshop & ancillary
offices.
1. EL/1/230 
2. TIBA
1. 9 Chanonry Road South, Elgin 
2. David McCrea
1. 110sqm 
2. -
1. 1/4/16 
2. 3 years
1. £8,900 p.a. +
VAT 
2. £9,700 p.a. +
VAT
Permitted Use:
Storage & distribution
unit with showroom &
ancillary sales.
Page 248

Page 249

1. EL/1/216 
2. TIBA
1. 10 Chanonry Road North, Elgin 
2. Moray Distillery Ltd
(SC519606)
1. 110sqm 
2. 0.01Ha
1. 1/6/16 
2. 3 years
1. £8,600 p.a. +
VAT 
2. £9,800 p.a. +
VAT
Permitted Use:
Use as a production,
storage & distribution
premises for a micro-
distillery business,
1. EL/1/201 
2. TIBA
1. 3 Chanonry Spur, Elgin 
2. Iain Emslie
1. 174sqm 
2. 0.09Ha
1. 17/2/18 
2. 3 years
1. £11,635 p.a. +
VAT 
2. £14,600 p.a. +
VAT
Permitted Use:
Storage &
maintenance of taxi
vehicles.
1. LH/1/201 
2. IAWA
1. Unit 1 Lhanbryde Industrial
Estate, Lhanbryde 
2. Raymond MacKenzie
1. 47.2sqm 
2. 0.02Ha
1. 1/11/00 
2. 3 years
1. £4,350 p.a. 
2. £4,900 p.a.
Permitted Use:
Interior decorator/
Upholstery store &
workshop.
1. EL/5/272 
2. TIBA
1. Unit F Pinefield Business
Centre, Elgin 
2. Mr Jihad Kabbani
1. 59sqm 
2. -
1. 11/7/01 
2. 3 years
1. £4,800 p.a. 
2. £5,400 p.a.
Permitted Use:
As a store in
connection with the
tenant’s confectionary
wholesale business.
1. EL/5/111 
2. TIBA
1. 6 Parade Spur South, Elgin 
2. Edward Gordon Laing & Steven
Sim
1. - 
2. 0.02Ha
1. 2/3/92 
2. 5 years
1. £1,055 p.a. 
2. £1,600 p.a.
Permitted Use:
Store, workshop &
showroom for
motorcycle dealer. 
Page 249

Page 250

1. EL/5/101 
2. TIBA
1. 6 Diagonal Road, Elgin 
2. Yorsipp (Trustees) Ltd
(04242849)
1. - 
2. 0.08Ha
1. 1/10/82 
2. 5 years
1. £2,750 p.a. 
2. £3,265 p.a.
Permitted Use:
To be used for the
tenant’s builders
business as a
workshop & store.
1. EL/5/100 
2. TIBA
1. 3 Diagonal Road, Elgin 
2. Darroch & Allan
1. - 
2. 0.09Ha
1. 1/5/92 
2. 5 years
1. £3,300 p.a. 
2. £3,900 p.a.
Permitted Use:
In connection with their
business of
carpenters, joiners &
shop fitters.
Increased rent not
payable until 1/10/22
under lease terms.
1. FR/3/101 
2. IAWA
1. 2 Waterford Way, Forres 
2. Mr Neil Logan & Mrs Angela
Logan
1. - 
2. 0.12Ha
1. 17/9/82 
2. 5 years
1. £950 p.a. 
2. £1,250 p.a.
Permitted Use:
Builders’ workshop &
store.
1. EL/1/211 
2. TIBA
1. 12 Chanonry Road South, Elgin 
2. Speyfruit Ltd
1. - 
2. 0.31Ha
1. 1/12/06 
2. 5 years
1. £9,370 p.a. 
2. £12,250 p.a.
Permitted Use:
Vegetable processing
plant together with
offices & other
ancillary uses thereto. 
Page 250

Page 251

1. EL/1/129 
2. TIBA
1. 10 Chanonry Road South, Elgin 
2. Laird Properties Ltd
(SC573862)
1. - 
2. 0.13Ha
1. 1/8/17 
2. 5 years
1. £6,000 p.a. +
VAT 
2. £7,000 p.a. +
VAT
Permitted Use:
Ground lease for
development of
workshop, store &
offices in connection
with plumbing
business.
1. EL/5/107 
2. TIBA
1. 2 Parade Spur South, Elgin 
2. Manitoba Holdings Ltd
(SC213696)
1. - 
2. 0.03Ha
1. 14/12/92 
2. 5 years
1. £1,325 p.a. 
2. £1,750 p.a.
Permitted Use:
Workshop/store & yard
for assembly of
electrical control
panels & associated
purposes.
1. KE/1/203 
2. ALBU
1. 3 Westerton Road South, Keith 
2. Gordon Duncan Ltd
1. 65sqm 
2. 0.01Ha
1. 20/8/10 
2. 3 years
1. £3,575 p.a. 
2. £4,100 p.a.
Permitted Use:
Light haulage storage/
warehouse.
1. KE/3/252 
2. ALBU
1. The Gatehouse, Isla Bank Mills,
Keith 
2. Great Scot (Scotland) Ltd
1. 217sqm 
2. 0.01Ha
1. 21/10/19 
2. 3 years
1. £9,750 p.a. 
2. £11,200 p.a.
Permitted Use:
Offices with ancillary
storage.
1. KE/1/229 
2. ALBU
1. 9 Westerton Road North, Keith 
2. Alan Duffus
1. 51.8sqm 
2. -
1. 6/8/04 
2. 3 years
1. £3,510 p.a. 
2. £3,800 p.a.
Permitted Use:
Storage & cleaning of
equipment used in
tenant’s bakery
business. 
Page 251

Page 252

Page 252

Page 253

APPENDIX III 
REPORT TO THE ECONOMIC DEVELOPMENT & INFRASTRUCTURE SERVICES COMMITTEE ON 7 FEBRUARY 2023 
GRANT OF SERVITUDES AND WAYLEAVES 
Officer Intls  File Ref  Address Description Price  Comments
CQ LH/GEN Amenity Ground, Kirkland Hill,
Lhanbryde, IV30 8QH
Wayleave to BT Openreach £657.51 In relation to Fibre Broadband
high-speed Internet Network
upgrades. 
CQ LO/GEN St Gerardine's Primary School,
Lossiemouth
Wayleave to BT Openreach £538.80 In relation to Fibre Broadband
high-speed Internet Network
upgrades. 
CQ LO/GEN 8 Dunbar Court, Lossiemouth,
IV31 6NE 
Wayleave to BT Openreach £525.87  In relation to Fibre Broadband
high-speed Internet Network
upgrades. 
Page 253

Page 254

Page 254

Page 255

APPENDIX IV 
REPORT TO THE ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES COMMITTEE ON 7 FEBRUARY 2023 
LIST OF SALES OF GROUND TO ADJOINING PROPRIETORS – SUBMITTED FOR NOTING 
Description  Address  Purchaser Price  Comments
Sale of ground 29sqm  Land adjacent to
Southview, Main Street,
Urquhart
Mr & Mrs D Templeton £1,160 Concluded 24/10/22 
Planning Consent obtained
Ref: 22/00483/APP 
Estates Ref:  CQ 
Sale of ground 120sqm  Land adjacent to 18
Pilmuir Road West, Forres
Mr & Mrs G Thornton £8,400 Concluded 3/11/22 
Planning Consent obtained
Ref: 22/00660/APP 
Estates Ref:  CQ 
Sale of ground 39sqm  Land adjacent to 18 High
School View, Elgin
Mr A Nascimento & Ms M
Coull
£2,535 Concluded 30/11/22 
Planning Consent obtained
Ref: 22/00079/APP 
Estates Ref:  CQ 
Page 255

Page 256

Sale of ground 50sqm  Land adjacent to 13
Seatown, Buckie
Mr David Gardiner & Mrs
Lesley Gardiner
£1,750 Concluded 20/12/22 
Planning Consent obtained
Ref: 22/00398/APP 
Estates Ref:  CQ 
Page 256

Page 257

APPENDIX V
REPORT TO THE ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES COMMITTEE ON 7 FEBRUARY 2023 
LIST OF ASSIGNATIONS OF SITES/UNITS - SUBMITTED FOR NOTING 
1. Ref No
2. Valuer’s Ints
1. Assignor
2. Assignee
Address Lease Details Remarks
1. El/5/111 
2. TIBA
1. Edward Gordon Laing &
Steven Sim 
2. Edward Gordon Laing
6 Parade Spur South
Elgin
IV30 6AJ
Lease Commenced
2/3/92
Lease Term
99(Y), 0(M), 0(D)
Rental
£1,600 
Permitted Use:
Store, workshop &
showroom for motorcycle
dealer.
Ground Lease assigned
into sole name on
18/11/22. 
Page 257

Page 258

Page 258

Page 259

APPENDIX VI
REPORT TO THE ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES COMMITTEE ON 7 FEBRUARY 2023 
LIST OF PROPERTY ACQUISITIONS – SUBMITTED FOR NOTING 
Officers
Intls
Plot No/Road Improvement
Scheme
Description of Land to be
Acquired
Land Owner Compensation
Agreed
Comments
ALBU Roadside Cottage
Rafford
103.9sqm of garden
ground for new footpath
Mr Paul & Mrs Annie
Hughes
£1,300 Area to be adopted only
not purchased. 
ALBU 1 Granary Park
Rafford
71sqm of garden ground
for new footpath
Mr Edward & Mrs Jean
Wills
£800 Area to be adopted only
not purchased. 
ALBU 2 Granary Park
Rafford
78.8sqm of garden ground
for new footpath
Mr Gary & Mrs Shirley
Munn
£940 Area to be adopted only
not purchased. 
ALBU Keeper’s Cottage
Rafford
76.2sqm of scrub
woodland for new footpath
Mr Gordon & Mrs
Margaret Birnie
£1,100 Area to be adopted only
not purchased. 
Page 259

Page 260

Page 260