Democracy Spraffa

Agenda Document Pack - Economic Development and Infrastructure Services Committee - 15/11/2022

Moray Council · 15 November 2022
Back to Economic Development and Infrastructure Services Committee — 15 November 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Economic Development and Infrastructure Services
Committee 
Tuesday, 15 November 2022 
NOTICE IS HEREBY GIVEN that a Meeting of the Economic Development and
Infrastructure Services Committee is to be held at Council Chambers, Council
Office, High Street, Elgin, IV30 1BX on Tuesday, 15 November 2022 at 09:30. 
BUSINESS 
1 Sederunt 
2 Declaration of Group Decisions and Members Interests * 
3 Minute of Meeting dated 6 September 2022 7 - 16
4 Written Questions ** 
5 Active Travel Strategy and Action Plan
Report by Depute Chief Executive (Economy, Environment and
Finance)  
17 - 84
6 Local Flood Risk Management Plan Cycle 2 Findhorn
Nairn and Speyside 2022-2028
Report by Depute Chief Executive (Economy, Environment and
Finance)  
85 -
288
7 Local Flood Risk Management Plan Cycle 2 North East
2022 2028
Report by Depute Chief Executive (Economy, Environment and
Finance)  
289 -
356
Page 1

Page 2

8 Update on Council Sandbag Policy and Property
Protection Products
Report by Depute Chief Executive (Economy, Environment and
Finance)  
357 -
366
9 Nature Restoration Fund Long Term Plan
Report by Depute Chief Executive (Economy, Environment and
Finance)  
367 -
372
10 Annual Report on Energy Strategy Actions
Report by Depute Chief Executive (Economy, Environment and
Finance)  
373 -
388
11 Economic Development Annual Review 2021-22
Report by Depute Chief Executive (Economy, Environment and
Finance)  
389 -
428
12 Performance Report (Economic Growth and
Development Services) - Period to September 2022
Report by Depute Chief Executive (Economy, Environment and
Finance)  
429 -
434
13 Performance Report (Environmental and Commercial
Services) - Period to September 2022
Report by Depute Chief Executive (Economy, Environment and
Finance)  
435 -
440
14 Marine Safety and Operational Update Q2 2022-2023
Report by Depute Chief Executive (Economy, Environment and
Finance)  
441 -
452
15 Question Time ***
Consider any oral question on matters delegated to the Committee in
terms of the Council's Scheme of Administration. 
Page 2

Page 3

Summary of Economic Development and Infrastructure
Services Committee functions:
Roads Authority; Lighting Authority, Reservoirs Act 1975, Public
Passenger Transport; Flood Prevention; Twinning; Piers and Harbours
and Coast Protection; Industrial and Commercial Development;
Environmental Protection; Burial Grounds; Assistance to Industry or
Commerce; Public Conveniences; Council Transportation; Catering &
Cleaning; Land Reform (Scotland) Act 2003; Countryside Amenities;
Tourism, monitoring funding from European Programmes, youth
training and employment creation scheme and provide Architectural,
Quantity Surveying, Maintenance and Allied Property Services.     
Page 3

Page 4

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how
the individual or members of the group will vote on any item(s) of business on
the Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any
relevant and competent business within the specified remits not already on the
agenda, to the Chair provided it is received by the Proper Officer or Committee
Services by 12 noon two working days prior to the day of the meeting.  A copy
of any written answer provided by the Chair will be tabled at the start of the
relevant section of the meeting.  The Member who has put the question may,
after the answer has been given, ask one supplementary question directly
related to the subject matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the
consent of the Chair. If a Member does not have the opportunity to put a
supplementary question because no time remains, then he or she can submit it
in writing to the Proper Officer who will arrange for a written answer to be
provided within 7 working days. 
*** Question Time - At each ordinary meeting of the Committee ten minutes will be
allowed for Members questions when any Member of the Committee can put a
question to the Chair on any business within the remit of that Section of the
Committee.  The Member who has put the question may, after the answer has
been given, ask one supplementary question directly related to the subject
matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than ten minutes
after the Committee has started on the relevant item of business, except with
the consent of the Chair.  If a Member does not have the opportunity to put a
supplementary question because no time remains, then he/she can submit it in
writing to the proper officer who will arrange for a written answer to be provided
within seven working days. 
Page 4

Page 5

THE MORAY COUNCIL 
Economic Development and Infrastructure Services
Committee 
SEDERUNT 
Councillor Marc Macrae  (Chair)
Councillor Amber Dunbar  (Depute Chair)  
Councillor Peter Bloomfield  (Member)
Councillor John Cowe  (Member)
Councillor John Divers  (Member)
Councillor David Gordon  (Member)
Councillor Juli Harris  (Member)
Councillor Sandy Keith  (Member)
Councillor Graham Leadbitter  (Member)
Councillor Paul McBain  (Member)
Councillor Shona Morrison  (Member)
Councillor Draeyk Van Der Horn  (Member)
Councillor Sonya Warren  (Member)  
Clerk Name: Lissa Rowan
Clerk Telephone: 07765 741754
Clerk Email: committee.services@moray.gov.uk 
Page 5

Page 6

Page 6

Page 7

MORAY COUNCIL 
Minute of Meeting of the Economic Development and Infrastructure Services
Committee 
Tuesday, 06 September 2022 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor Peter Bloomfield, Councillor John Cowe, Councillor John Divers,
Councillor Amber Dunbar, Councillor David Gordon, Councillor Juli Harris, Councillor
Sandy Keith, Councillor Graham Leadbitter, Councillor Marc Macrae, Councillor Paul
McBain, Councillor Shona Morrison, Councillor Draeyk Van Der Horn, Councillor
Sonya Warren 
ALSO PRESENT 
Councillor Mustard (Item 6 - Cloddach Bridge Structural Assessment) 
IN ATTENDANCE 
Depute Chief Executive (Economy, Environment and Finance), Head of
Environmental and Commercial Services, Head of Economic Growth and
Development, Head of Housing and Property, Consultancy Manager, Mrs D
Anderson, Senior Engineer (Transportation), Public Transport Manager,
Opportunities for All Officer, Property Asset Manager, Ms S Ward, Climate Change
Strategy Officer, Harbour Development and Operations Manager, Mr C Muir, Senior
Officer (Economic Strategy and Development), Legal Services Manager and Mrs L
Rowan, Committee Services Officer as Clerk to the Committee.   
1         Chair 
Councillor Macrae, being Chair of the Economic Development and Infrastructure
Services Committee, chaired the meeting.   
2         Declaration of Group Decisions and Members Interests 
In terms of Standing Order 20 and the Councillors’ Code of Conduct, there were no
declarations from Group Leaders or Spokespersons in regard to any prior
decisions taken on how Members will vote on any item on the agenda or any
declarations of Member’s interests in respect of any item on the agenda. 
3         Minutes 
The Minutes of the following meetings were submitted and approved: 
(i) Minute of Economic Development, Planning and Infrastructure Appointments
Committee dated 9 June 2022; 
Item 3
Page 7

Page 8

(ii) Minute of Meeting of the Economic Development and Infrastructure Services
Committee dated 21 June 2022; and 
(iii) Minute of Economic Development, Planning and Infrastructure Appointments
Committee dated 1 July 2022.   
4         Written Questions 
The Committee noted that no written questions had been submitted. 
5         Notice of Motion - Councillors McBain and Dunbar 
In terms of Standing Order 34a, there was submitted a Notice of Motion by
Councillor McBain, seconded by Councillor Dunbar in the following terms:  
The current Scottish Government promised to ‘ensure that 100 per cent of
premises across Scotland have access to super-fast broadband by 2021’ but even
before the pandemic, this was not on track to be met. Work will now run until at
least 2027.  
The continued delays on delivering broadband have been unacceptably slow.
Superfast and reliable broadband is vital for Moray, particularly as we emerge from
the pandemic and see working from home continuing for many. Yet, we continue to
have slow speeds particularly in our more rural communities.  
As a result, we ask the committee to consider the following motion:  
The committee recognises the lack of progress by the Scottish Government on
rolling out super-fast broadband across Moray and the impact this is having on
individuals and businesses.  
The committee asks the chair to write to the Deputy First Minister for an update on
plans for roll out and detail as to what action is being taken to speed up timescales
to achieve 100% super-fast broadband coverage.  
Councillor Leadbitter was of the view that the lack of progress by the Scottish
Government on rolling out super-fast broadband across Moray was due to a
number of unfortunate delays that could not be avoided such as the Covid-19
pandemic and noted that improving broadband coverage was a UK and Scottish
Government project.  He therefore moved, as an amendment, that the Committee:  
(i) acknowledge the importance of rolling out super-fast broadband across
Moray and the positive impact it is having on individuals and businesses; 
(ii) further acknowledge that a number of delays in rollout have occurred,
including as a result of the pandemic; and 
(iii) instruct the Chair to write to both the Scottish and UK Governments, who
are partners in the R100 programme, impressing upon them the importance
making up time, welcoming the recent joint Scottish and UK Government
announcement of an additional £36M investment in the programme and
seeking an update on timescales and plans for roll out in Moray and detail
Page 8

Page 9

as to what action is being taken to speed up timescales to achieve 100%
super-fast broadband coverage.  
This was seconded by Councillor Harris.  
After considering the amendment put forward by Councillor Leadbitter and
seconded by Councillor Harris, both Councillors McBain and Dunbar agreed to
withdraw their original motion in favour of the amendment.  
There being no-one otherwise minded, the Committee: 
(i) acknowledged the importance of rolling out super-fast broadband across
Moray and the positive impact it is having on individuals and businesses; 
(ii) further acknowledged that a number of delays in rollout have occurred,
including as a result of the pandemic; and 
(iii) instructed the Chair to write to both the Scottish and UK Governments, who
are partners in the R100 programme, impressing upon them the importance
making up time, welcoming the recent joint Scottish and UK Government
announcement of an additional £36M investment in the programme and
seeking an update on timescales and plans for roll out in Moray and detail
as to what action is being taken to speed up timescales to achieve 100%
super-fast broadband coverage.   
6         Cloddach Bridge Structural Assessment 
A report by the Depute Chief Executive (Economy, Environment and Finance)
informed the Committee of the structural condition of Cloddach Bridge which is
currently closed in the interest of public safety and advised on the options available
for the future operation of this bridge.  
At the invitation of the Chair, Councillor Mustard stated that Cloddach Bridge is a
vital route for the local community in terms of connection to Elgin High School, is
used by agricultural machinery, a diversion when other routes in Elgin are flooded
and supports the rural economy and that closure of the bridge increases journey
times considerably for the local community.  As the Council is considering the
permanent closure of the bridge, the community wished their concerns to be noted
prior to any decision being made.  Councillor Mustard went on to state that the
community had actively voiced their concerns via Heldon Community Council, a
Facebook group, by means of a public meeting and by submitting a petition to the
Council.  Councillor Mustard stated that the Community supported
recommendation i) in the report which recommended that Cloddach Bridge
remains closed to vehicular traffic but open to pedestrians and cyclists with regular
inspections to monitor the condition of the bridge.  However, with regard to
recommendation ii) the community were concerned in relation to the permanent
nature of this recommendation which they believed left no opportunity for the
community to explore options to keep the bridge open.  The community did not feel
that their views on the closure of the bridge had been properly considered by the
Council and asked that the Committee consider deferring the decision for the
closure and removal of the bridge with a view to exploring options with the
community before any decision is made.  
Page 9

Page 10

Councillor Cowe stated that he had attended the public meeting at the bridge the
previous evening along with other Elected Members and noted the large number of
people that had attended the meeting.  He acknowledged the financial state of the
Council and stated that the Council did not have the funds to keep the bridge
open.  Councillor Cowe stated that the community would like to explore ways in
which to keep the bridge with the support from Moray Council Officers and moved
that the Committee agree recommendation i) as printed with an additional
recommendation for a meeting between representatives from Heldon Community
Council, Cloddach Bridge Action Group, key Council Officers, Group Leaders and
local Ward Members to be arranged, within Council premises, to determine future
options with regard to Cloddach Bridge, with composition of the meeting being
delegated to the Depute Chief Executive (Economy, Environment and Finance),
the Chair of this Committee and Group Leaders.  This was seconded by Councillor
Divers.  
There being no-one otherwise minded, the Committee agreed that: 
(i) Cloddach Bridge remains closed to vehicular traffic but open to pedestrians
and cyclists with regular inspections to monitor the condition of the bridge;
and 
(ii) a meeting between representatives from Heldon Community Council,
Cloddach Bridge Action Group, key Council Officers, Group Leaders and
local Ward Members be arranged within Council premises to determine
future options with regard to Cloddach Bridge, with composition of the
meeting being delegated to the Depute Chief Executive (Economy,
Environment and Finance), the Chair of this Committee and Group Leaders.   
7         National Strategy for 20mph 
A report by the Depute Chief Executive (Economy, Environment and Finance)
updated the Committee on the Scottish Government's National Strategy for 20
mph which aims to ensure all appropriate roads in built-up areas have a safer
speed limit of 20 mph by 2025.  
Following consideration, the Committee agreed: 
(i) to note that Transport Scotland are gathering information from local
authorities with respect to 20mph speed limits and zones, after which it is
anticipated that Transport Scotland will provide further guidance,
information on funding and a timetable for implementation; and 
(ii) to review forthcoming guidance and information on funding before
proceeding with any new 20mph speed limits or 20mph zones in Moray.   
8         Proposed Revision of Bus Fare Structure 
A report by the Depute Chief Executive (Economy, Environment and Finance)
asked the Committee to consider the proposal to both simplify and harmonise the
current supported bus service fares through the introduction of a zonal fare
structure and grant delegated authority in setting additional fares and promotions
to meet market demand.  
Page 10

Page 11

During discussion, Councillor Warren raised concern at the cost of a single weekly
bus pass for 2 zones being £42 given the cost of living crisis, particularly as some
single parents are having to transport children to nurseries outwith the area in
which they stay due to lack of nursery spaces, and asked if this fare could be
reduced.  
In response, the Public Transport Manager advised that the suggested bus fares
are on par with other bus fares nationally.  The Head of Environmental and
Commercial Services further advised that calculating bus fares is a complicated
task whereby there is a balance to be made between covering the cost of running
the service and being affordable.  
Councillor Warren remained of the view that £42 for a 2 zone weekly ticket was too
expensive and moved that the Committee agree recommendations 1 and 3
however asked that a further report be brought to a future meeting of this
Committee before enacting the weekly and monthly tickets.  This was seconded by
Councillor Morrison.  
As an amendment, Councillor McBain moved the recommendations as printed
within the report.  This was seconded by Councillor Bloomfield.  
On a division there voted:  
For the Motion
(5):
Councillors Warren, Morrison, Harris, Leadbitter and Van
Der Horn
For the
Amendment (8):
Councillors McBain, Bloomfield, Cowe, Divers, Dunbar,
Gordon, Keith and Macrae
Abstentions (0): Nil  
Accordingly, the amendment became the finding of the Committee and it was
agreed to: 
(i) approve the proposal to simplify and harmonise bus fare options through a
zonal system on demand responsive and local bus services; 
(ii) award the Head of Environmental and Commercial Services delegated
authority to enact new ticket types as set out in paragraph 4.6 of the report;
and 
(iii) award the Head of Environmental and Commercial Services, in consultation
with the Head of Financial Services delegated authority to consider short
term fares offers and promotions as appropriate.   
9         Moray Pathways Local Employability Partnership Delivery Plan 
A report by the Depute Chief Executive (Economy, Environment and Finance)
provided the Committee with the Moray Pathways delivery plan 2022-2025 and the
new governance structure to align funds and integrate local employability services.  
Following consideration, the Committee agreed to note the delivery plan and the
governance structure for local employability funds and delivery.   
10         Moray Hydrogen Strategy
Page 11

Page 12

A report by the Depute Chief Executive (Economy, Environment and Finance)
sought the agreement of the Committee to adopt the Moray Hydrogen Strategy
and agree that an application to the North East Just Transition Fund to progress
action on the strategy be submitted if the Council's expression of interest is
successful.  
Following consideration, the Committee agreed to: 
(i) approve and adopt the Moray Hydrogen Strategy, as set out in Appendix 1
of the report, including recommended actions; and 
(ii) note the Council’s expression of interest to the North East Just Transition
Fund, as set out in Appendix 2 of the report, in respect of funding for
hydrogen pilot project feasibility studies, and the development of a costed
delivery plan.   
11         Local Heat And Energy Efficiency Strategy 
A report by the Depute Chief Executive (Economy, Environment and Finance)
informed the Committee of the duties required under the Local Heat and Energy
Efficiency Strategy (Scotland) Order 2022 and sought approval of plans to comply
with the Order.  
Following consideration, the Committee agreed to: 
(i) note the duties required under the Local Heat and Energy Efficiency
Strategy (Scotland) Order 2022 and the recent announcement of funding for
the council to progress this; 
(ii) approve the appointment of a Local Heat and Energy Efficiency Strategy
(LHEES) Officer as proposed in the report and associated consultancy work
(within the Scottish Government funding provided) to develop an LHEES
and delivery plan; and 
(iii) approve the submission of this report and agreed recommendations to the
Community Planning Partnership (CPP), and for subsequent progress
updates to be copied to the CPP.   
12         Depot and Store Review 
A report by the Depute Chief Executive (Economy, Environment and Finance)
provided the Committee with an update on the progress with undertaking a review
of the Council's operational depots and stores, in accordance with the Council's
Property Asset Management Appraisal (PAMA).  
During discussion surrounding the appropriate storage of items that had previously
been stored within the Buckie Drifter and common good items currently in storage
in Forres, assurance was sought that these items were being stored appropriately
and it was further queried whether a list of the items in storage is available.  
In response, the Property Asset Manager advised that items previously stored
within the Buckie Drifter were now being stored in the former Lossiemouth Library
Page 12

Page 13

and agreed to circulate information following the meeting confirming that the items
previously stored within the Buckie Drifter which are now currently stored at the
former Library in Lossiemouth and also common good items currently stored in
Forres are being stored in appropriate storage conditions including a list of the
items in storage.  
Following consideration, the Committee agreed to note: 
(i) the work undertaken to date; 
(ii) that Officers have identified opportunities and are working to deliver early
savings as outlined in paragraph 4.7 of the report; 
(iii) that a further update on progress will be provided once the outline business
case is developed; and 
(iv) that information be circulated following the meeting confirming that the items
previously stored within the Buckie Drifter which are now currently stored at
the former Library in Lossiemouth and also common good items currently
stored in Forres are being stored in appropriate storage conditions including
a list of the items in storage.   
13         Nature Restoration Fund 
A report by the Depute Chief Executive (Economy, Environment and Finance)
informed the Committee of the delivery of projects under the Scottish
Government's Nature Restoration Fund grant in 2021-22 of £101,000 and of this
year's allocation from the same fund of £124,000 and asked the Committee to
agree proposals for 2022-23. 
Following consideration, the Committee agreed: 
(i) to note the delivery of the Scottish Government’s Nature Restoration Fund
grant allocation in 2021/22; 
(ii) to note receipt of the £124,000 grant from the same fund for 2022/23; 
(iii) the proposed projects for 2022/23 as set out in para 5 of the report and that
any changes to costs across these projects can be authorised by the Head
of Economic Growth and Development; and 
(iv) that a further report be submitted on 15 November 2022 setting out a longer
term plan.   
14         Marine Safety and Operational Update Q1 2022-2023 
A report by the Depute Chief Executive (Economy, Environment and Finance)
informed the Committee on matters of Marine Safety and compliance with the Port
Marine Safety Code (PMSC) for the period Q1 year 2022/23.  
During discussion surrounding the dredging plan for Buckie Harbour, confirmation
was sought that the basins would be included when dredging the channel.  
Page 13

Page 14

In response, the Harbour Operations Manager confirmed that the channel in
Buckie Harbour is a priority for dredging and that this includes the basins and that
these will be included in the dredging plan for Buckie Harbour going forward.  
During further discussion surrounding Harbour Advisory Committee meetings, it
was queried whether Action Logs and Minutes from these meetings could be
forwarded on to the Harbour Advisory Committee once completed.  
In response, the Harbour Operations Manager agreed to forward the Action Log
and Minutes from Harbour Advisory Committee meetings to the Harbour Advisory
Committee once completed.  
The Harbour Operations Manager further responded to questions from the
Committee in relation to maintenance of the Selkie, the quality of navigation lights,
safety of pier lighting and the updating of CCTV cameras.  
The Committee joined the Chair in welcoming the new style of reporting of the
Marine Safety and Operation Update reports and thereafter agreed to note: 
(i) the safety performance, fulfilling their function as Duty Holder under the Port
Marine Safety Code; 
(ii) that the channel in Buckie Harbour is a priority for dredging and that this
includes the basins and that these will be included in the dredging plan for
Buckie Harbour going forward; and 
(iii) that the Action Log and Minutes from Harbour Advisory Committee
meetings will be forwarded to the Harbour Advisory Committee once
completed.   
15         Capital and Revenue Budget Monitoring to 30 June 2022 
In terms of Standing Order 83, the Committee agreed to suspend Standing Order
75 to allow the meeting to proceed beyond 12:45 pm. 
A report by the Depute Chief Executive (Economy, Environment and Finance)
informed the Committee of the current position regarding Environmental and
Commercial Services and Economic Growth and Development Services
(Economic Development) Capital and Revenue Budgets.  
Following consideration, the Committee agreed to: 
(i) note the budget monitoring report for the period to 30 June 2022; and 
(ii) approve the funding allocation under the Switched on Fleets programme as
set out in para 6.12 of the report.   
16         Economic Recovery Key Performance Indicators 
A report by the Depute Chief Executive (Economy, Environment and Finance)
provided the Committee with an annual report of the Key Performance Indicators
(KPIs) for the Economic Recovery Plan for Moray.  
Page 14

Page 15

Following consideration, the Committee joined the Chair in congratulating the
Procurement Service for spending 25.8% of its spend within Moray which is a
considerable support to local business and thereafter agreed to note the impact of
the Economic Recovery plan in supporting the Moray economy as it continues to
recover from the COVID pandemic.   
17         Question Time 
Under reference to paragraph 6 of the Minute of the meeting of this Committee
dated 21 June 2022, Councillor Warren sought an update as to when the report on
the use of glyphosate will be brought to this Committee for consideration.  
In response, the Head of Environmental and Commercial Services advised that the
ban would not be operative until 2025 and it was hoped the report would be
brought to the meeting of this Committee on 7 February 2023.  
Under reference to paragraph 12 of the Minute of the meeting of this Committee
dated 21 June 2022 in relation to the Dial M Service, Councillor Warren sought an
update as to how the service is being promoted within the community outwith
social media.  
In response, the Head of Environmental and Commercial Services advised that a
joint late summer campaign alongside Stagecoach is underway promoting the use
of public transport.  Furthermore, work is ongoing to produce a marketing tender to
support the launch of additional services associated with the Growth Deal project
which will promote the Dial M Service.  With regard to raising awareness in the
community, work is underway to re-establish the Transport Forum which is
community led and an excellent means of promoting the transportation service
within community groups.  
Under reference to paragraph 12 of the Minute of the meeting of this Committee
dated 21 June 2022 in relation to support for Small and Medium-sized Enterprises
(SMEs) and charities in relation to rising energy costs, Councillor Warren
acknowledged that the Chair had previously written to the UK Government
highlighting the struggles of SMEs however asked that a further letter be written
asking for a price cap on energy for businesses as many are struggling with the
rising cost of energy.  
In response, the Chair agreed to re-write to the UK Treasury in this regard.  
Councillor Cowe stated that there was a possibility that the GP Surgeries in
Hopeman and Burghead may close leaving some constituents with a 3 hour round
trip to attend an appointment at the Surgery in Lossiemouth and queried if there
was anything the Council could do to assist in this regard.  
In response, the Head of Environmental and Commercial Services advised that
resources had been moved around to provide additional demand response
services and that the Public Transport Manager would be happy to discuss this
further with Councillor Cowe following the meeting.  
Councillor Warren noted that the use of red diesel is no longer permitted for use in
the Council’s industrial plant and machinery and asked if the Chair could raise this
at a future meeting of COSLA with a view to further investment in clean green plant
and machinery.
Page 15

Page 16

In response, the Chair advised that he would raise this at the next meeting of the
Economic Development and Infrastructure members at COSLA in October and
report the outcome back to the Committee.  
Councillor Gordon noted the increase in the amount of industrial traffic on the A941
at Rothes and sought assurance that the road could cope with this increased
usage.  
In response, the Head of Economic Growth and Development advised that, with
each planning application, a transport assessment is carried out that considers any
impact on local roads and mitigates against this.   
Page 16

Page 17

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 15 NOVEMBER 2022 
SUBJECT: ACTIVE TRAVEL STRATEGY AND ACTION PLAN 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 The Committee is asked to approve the Active Travel Strategy for Moray
which sets out the Council’s vision and action plan over the next 5 years for
Active Travel in Moray. 
1.2 This report is submitted to Committee in terms of Section III (F) (17) of the
Council's Scheme of Administration relating to traffic management functions. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee: 
i. note the consultation that has taken place with Stakeholders; and 
ii. agrees the Active Travel Strategy, as set out in Appendix 1 of the
report, as the policy position for Moray Council and as a forward
programme of activity subject to appropriate funding being
available. 
3. BACKGROUND 
3.1 This is the Council’s second Active Travel Strategy (ATS), with the previous
strategy covering the period from 2016 to 2021. The ATS is a 5 year plan from
2022 to 2027 that aims to build on the increase in walking and cycling seen
over the last 5 years in Moray, as well as meeting Scottish Government
recommendations. 
3.2 Active Travel has many benefits to both communities and individuals, and has
a number of positive outcomes for public health, social inclusion, reducing the
environmental impact of transport and for supporting local economic activity.
By choosing to walk or cycle over private vehicle use, it can help deliver a low
cost, high return for society as a whole and on individual health. 
3.3 Scotland’s National Transport Strategy 2 (NTS2) sets out a vision for the next
20 years to create a transport system that is sustainable, safe, accessible and
Item 5
Page 17

Page 18

inclusive for all. The NTS2 focuses on Active Travel as one of its key priorities
as it aims to reduce inequalities, take climate action through promoting
greener, cleaner travel choices, which will support the net zero target and
improve our health and wellbeing. The Sustainable Transport Hierarchy
identified in NTS2 prioritises walking, wheeling, cycling and public transport
over single occupancy car use, and will be embedded in decision making to
address any challenges and achieve key priorities. 
3.4 The Council’s Climate Change Strategy sets a target for Council operations to
aim to be carbon neutral by 2030. There are four key actions within the
Climate Change strategy that focus on Active Travel; 
• Active travel for the journey to school; 
• Targeted travel behaviour change programmes;
• Workplace Travel Plan for the Council as employer; and
• Embedding Active Travel infrastructure provision through Development
Planning. 
With the importance of our need locally, nationally and globally to combat
climate change and reduce our carbon emissions, shifting from fossil fuel car
use to walking and cycling for every day journeys will help reduce carbon
emissions. It can also help to improve people’s physical and mental health,
which over the last 2 years has seen more pressure than ever before. 
3.5 The Scottish Government have set out a legally binding target of net zero
emissions by 2045, but with significant progress required to be made by 2030.
The National Planning Framework (NPF) sets out a strategic and policy
approach to development and infrastructure provision, and the current draft
NPF4 has set out a framework to help support the delivery of the Scottish
Government 2045 target. Increasing our levels of active travel is an important
contribution to achieving net zero, especially when noting that 37% of
Scotland’s greenhouse gas emissions arise from transport. 
3.6 Moray has a good record in encouraging walking and cycling as travel
choices, as evidenced in our past and current behaviour change initiatives.
These include ‘WOW Walk to School Travel Tracker’, where Moray schools
are regularly featured in the top 10 of Living Streets ‘Walk of Fame’ Scotland
challenges, as well as our Bikeability programme, ‘Love to Ride Moray’ and
the new ‘Speyside Challenge’. Throughout September the Speyside
Challenge saw over 40 participants competing to log the most active travel
journeys. The total journeys logged at the end of the challenge was 2,354km
and 306kg of Co2 was saved. This second ATS will build on that and will
enable us to deliver outcomes of improving health, creating safer communities
and reducing environmental impacts. Active Travel plays an important role in
public health, the environment in which we live in and the open spaces we
have access to.  It also contributes to differences in the health and wellbeing
of communities across Scotland by increasing opportunities for safe, attractive
and enjoyable walking, wheeling and cycling. 
3.7 On 7 December 2021, this committee approved a draft ATS and Action Plan
for a 12 week public consultation period, from 10 January to 3 April 2022
(para 11 of the minute refers). The draft version of the ATS has now been
revised following the public consultation and online engagement.
Page 18

Page 19

4. STAKEHOLDER AND PUBLIC CONSULTATION 
4.1 The amended version of the ATS which incorporates the changes made as a
result of the consideration of the consultation responses is attached as
Appendix 1. Minor amendments have been made to the content and to the
actions to reflect feedback from stakeholders. These included using all local
photographs throughout the strategy, as well as the inclusion of additional
tasks to support the actions. 
4.2 The consultation on the draft strategy was publicised through local
newspapers, the Moray Council website and social media, as well as posters
erected across walking and cycling routes, transport interchanges and shared
with community councils and committees. A printed version was also made
available at various locations, including Elgin library. 
4.3 Full details of the consultation and responses are attached as Appendix 2.
The consultation consisted of two main strands: 
i. 2 online consultations sessions/ workshops were held with a range of
stakeholders, and 
ii. An online survey (attached as Appendix 3). 
4.4 Moray Council’s communications team supported these activities with social
media promotion of the consultation and survey. 
4.5 Consultation Sessions/ Workshops: the 2 online workshops consisted of
representatives from:  
i. Moray Council (Roads Maintenance, Planning, Sport and Leisure,
Economic Growth and Regeneration and Environmental Protection
ii. Outfit Moray
iii. Moray Ways Association
iv. Forres Green Spaces
v. Cairngorms National Park
vi. TSI Moray
vii. Finderne Community Council 
4.6 Online Survey: The online survey was hosted on Survey Monkey and shared
on the Council’s Sustainable Travel page. It included questions on the
proposed vision, aims and objectives and action plan, as well as additional
socio – demographic questions and equality impact. The key questions were: 
• Do you agree with the proposed vision? If not, what alternative do you
propose?
• Where do you think there are current gaps in walking and cycling
infrastructure provision?
• What would encourage you to make more trips by foot or by cycle?
• Do you agree with the overall aims and objectives of the ATS?
• Do you consider that the proposed actions and tasks will deliver the
objectives? 
Page 19

Page 20

4.7 There were 84 respondents to the online survey. There was a spread of ages,
with the 55-64 age group forming the largest response rate. There was an
equal representation of both males and females at 45% each, 8.5% prefer not
to say and 1.5% other. All responses came from within Moray, with a good
mix of locations, although most who responded were from Elgin, Forres or
Speyside. Nearly 97% had access to a car and could drive, and 16%
considered their day to day activities to be impacted by a health problem or
disability. 
4.8 From the consultation, suggestions and improvements were made where
sections of the active travel network provision could be improved, as well
developing the objectives and actions in further detail. A number of minor
changes have been made to the final Strategy such as additional tasks to
clarify some of the actions in the Action Plan. The key amendments were; 
• All photographs used throughout the Strategy were changed to local
ones to showcase our infrastructure and scenery;
• The inclusion of a new action to develop a maintenance plan for Active
Travel infrastructure; 
• Inclusion of baseline data for some objectives such as, current walk to
school figures and level 2 Bikeability delivery;
• Expansion of the definition of Active Travel journeys to include
shopping as a reason;
• The measurement of objective 1, ‘to increase the Active Travel network
by 5% over the next 5 years’, was highlighted a number of times
throughout the feedback to be amended and increased from 5%.
However, upon analysis of the current work being undertaken
reviewing the Active Travel network and budget available, it was
agreed that the 5% increase would be for public road network only. 
4.9 The results from the consultation and stakeholder workshops showed a broad
support for the aims and actions of the strategy, but highlighted the need for
increased funding and resources in order to deliver the plan. This was evident
through comments received in the surveys, as documented in Appendix 2.
The comments did not indicate specific areas, projects or levels of funding
support required, but mentioned that the Council was perhaps under
resourced to deliver the aspirations of the consultees. Until interventions are
identified we are unable to quantify the level of funding and resources
needed. 
5. STRATEGY 
5.1  The ATS sets out the ways by which Moray Council will encourage more non-
motorised travel within Moray. The strategy sets out an active travel vision for 
Moray with supporting aims and objectives. An action plan is included in the 
strategy and work is on-going to identify active travel infrastructure projects in 
the action plan. The Vision for the strategy is: 
‘to create a culture and environment where active travel is embedded within
our communities as the automatic and obvious choice for everyday journeys
to school, work and leisure, by providing a safe, integrated and accessible
network for all.’ 
Page 20

Page 21

5.2  There are 3 simple overarching aims for this strategy: 
• to increase cycling and walking journeys to work; 
• to increase cycling and walking journeys to education; and 
• to increase the available infrastructure for active travel. 
5.3 The aims of the strategy are based on six specific objectives which are
focused around the provision of infrastructure and facilities, meaningful travel
planning, skills training and education/ behaviour change. 
5.4 There is on-going work to identify and prioritise infrastructure based on
suggestions and improvements from the consultation (see para 4.8), which
will include further consultation with the public as part of the review of the
Local Development Plan, and will be the subject of a future report. 
6. ACTION PLAN 
6.1 The strategy sets out a clear Action Plan with quantifiable outputs geared
towards achieving the objectives. There are 8 key actions within the plan all
relating to various aspects of improving Active Travel. Each action has
associated tasks with planned outcomes, leads and timescales through to
2027.  
6.2 The Action Plan sets out how the Council will continue to plan for the future,
and the need for maintenance requirements to be considered with existing
and new active travel infrastructure, as well as behaviour change and
education programmes. 
6.3 As part of the future planning for Active Travel infrastructure in Moray, a full
review of both the existing network (breakdown of adopted/ not adopted, core
paths etc.) and potential future route map plan, is currently being undertaken.
There will be further consultation and public engagement on Active Travel
infrastructure as part of the engagement for the review of the Local
Development Plan. Consultation will begin towards the end of 2022 on a pilot
project through Participatory Budgeting (PB), seeking feedback on the
provision of cycle parking and bike repair stations across Moray. 
6.4 Subject to approval, the next steps are to: 
• Identify membership of a working group comprising of both internal
Moray Council officers and external partners.
• Completion of the route map plan exercise which will form a baseline
picture and identify any gaps in provision of the network.
• Develop a project plan to deliver the action plan, based on key
priorities of each year.
• Develop a short and long term funding plan, which will include all
available sources of funding from Scottish Government, national and
local bodies, communities and the private sector. Almost all funding for
infrastructure and soft measures / behaviour change programmes
comes exclusively from external agencies.
• Develop a monitoring plan which will include a number of measures
that will be undertaken and assessed at regular intervals. This will
enable a progress report to be made on an annual basis.
Page 21

Page 22

• Ongoing delivery of some of the day tasks included in the action plan
will be supported by the Sustrans embedded officer. 
7. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The Active Travel Strategy and Action Plan support Moray’s 2026
priorities for healthier citizens as well as for older people to sustain active
lives in their community. As well as supporting economic development
targets by providing greater choice for travel within and between
communities. 
The Active Travel Strategy also supports all four of the priority areas of
the Local Outcome Improvement Plan; 
• Developing a diverse, inclusive and sustainable economy
• Building a better future for our children and young people in
Moray
• Empowering and connecting communities
• Improving wellbeing of our population 
(b) Policy and Legal
The Active Travel Strategy and Action Plan links to national and
regional policy objectives, as set out in the strategy document, and
Action 31 in the Moray Local Development Plan 2020 Delivery
Programme and Action Plan – Encourage Active Travel. 
There are no legal implications arising from this report. 
(c) Financial implications
The Scottish Government has committed to increasing investment to at
least £320 million or 10% of the total transport budget on active travel by
2024-25. As set out in the ATS, it is intended to fund the Action Plan
through existing funding streams, as well as applications for external
grant funding when the opportunity arises. 
With the increase of planned infrastructure, a bigger proportion of
maintenance budget will be needed to be spent in the future on any new
Active Travel routes, including winter maintenance and gritting. Roads
Maintenance are currently responsible for 25 miles of cycle tracks. 
Based on the consultation and engagement feedback, cycle parking and
repair station infrastructure has emerged as a key priority. Due to this,
we intend to run a pilot project using a Participatory Budgeting* (PB)
approach, and will allocate funds from our ‘Cycling Walking Safer
Routes’ grant. As PB will be initially trialled as a pilot project, larger
infrastructure projects are not within budget scope this year. 
*(Participatory budgeting (PB) is a democratic process in which
members of the public decide directly how to spend part of a public
budget. We support PB as a tool for community empowerment and as a
Page 22

Page 23

resource to build on the wider development of participatory democracy in
Scotland).
https://www.gov.scot/policies/community-empowerment/participatory-
budgeting/ 
There are no  financial implications arising from the recommendations in
this report, however it should be noted that comprehensive delivery of
the Action Plan will be contingent on successful sourcing of additional
grant funding (subject to Council approvals). 
(d) Risk Implications
Without an up to date Active Travel Strategy, there is a risk of a
fragmented approach to the provision of Active Travel infrastructure and
Behaviour Change programmes, which may not fully capitalise on
existing and future funding opportunities. 
(e) Staffing Implications
There are no staffing implications arising from this report as the delivery
of the draft Active Travel Strategy and Action Plan will be part of existing
staff duties. As part of Sustrans ‘Strategic Partnerships programme’, a
Sustrans embedded project officer working within the Council and will be
in post until May 2024. Their role is to support and help deliver the
actions and tasks within the action plan with respect to infrastructure
provision and community engagement on future active travel
infrastructure projects. 
The post is 100% funded through Transport Scotland for the first year of
delivery. Following this Sustrans would continue to pay 50% of costs for
a further two years, and the Council will match fund the other 50%
through the  ‘Cycling Walking Safer Routes’ (CWSR) grant funding. 
(f) Property
There are no property implications arising from this report. 
(g) Equalities/Socio Economic Impact
This strategy is subject to consultation with service users, which will feed
into an assessment of impacts in relation to the Public Sector Equality
Duty, The Fairer Scotland Duty, Human Rights and the Rights of the
Child. The assessment will be carried out in consultation with the
Council’s internal equality forum. 
Supporting active travel is beneficial for public health, and helps to tackle
inequalities. Raising the profile of active travel choices will also help to
improve accessibility for those with mobility disabilities. The provision of
new shared use paths when developing the network in Moray, will create
better accessibility for wheelchair users. 
(h) Climate Change and Biodiversity Impacts
Promoting active travel is one of the key actions in the Council’s Climate
Change Strategy. The Active Travel Strategy can provide a positive
impact on the climate through enabling and encouraging alternative
modes of travel through Moray. Reduced emissions supports nature
recovery and the overall improvement of environments.
Page 23

Page 24

(i) Consultations
The Depute Chief Executive (Economy, Environment and Finance),
Legal Services Manager, Equal Opportunities Officer, Chief Financial
Officer, Committee Services Officer (L Rowan), and Principal Climate
Change Strategy Officer have all been consulted and their comments
taken into account in this report. 
8. CONCLUSION 
8.1 The Active Travel Strategy and Action Plan sets out how the Council will 
take forward its vision for active travel in Moray. 
8.2 Having a strategy with a clear vision, and relevant objectives and 
actions that has been shaped through engagement with the public, has 
the potential to have a real positive effect and enhance the health and 
environment for all people across Moray. 
Author of Report: Janet MacDonald, Sustainable Travel Officer 
Background Papers: Previous Committee Report 7 December 2021 for draft
Active Travel Strategy and Action Plan 
Ref: SPMAN-524642768-796 
Page 24

Page 25

Moray Council 
ACTIVE 
TRAVEL 
STRATEGY
2022 - 2027
Item 5
Page 25

Page 26

2
Moray Active Travel Strategy 2022 - 2027
Our Vision is... 
‘To create a culture and
environment where
active travel is
embedded within our
communities as the
automatic and obvious
choice for everyday
journeys to school, work
and leisure by: providing
a safe, integrated and
accessible network for
all.’
Page 26

Page 27

Contents
Moray Active Travel Strategy 2022 - 2027
1
Introduction 2
Our Active Travel Strategy 4
What is Active Travel? 4
Active Travel and COVID-19 5
Vision Statement 5
Policy Rationale 6
Scottish Government Investment 8
Walking and Cycling Data in Moray 10
Existing Active Travel 16 
The Benefits of Active Travel 21
For the Environment 21
For the Economy 21
For Health 22 
Objective Setting 24
Objective Setting Process 24
Aims and Objectives 25 
Delivering the Strategy 27
Monitoring of the plan 28
Partnership and Funding 30
Equality Impact 31 
Appendix 33
1 - Moray Data 33
2 - Speyside Data 38
3 - Action Plan 40
Page 27

Page 28

Introduction
2
Moray Active Travel Strategy 2022 - 2027
N.B. Throughout this document you will notice a number of icons which
relate to the various aspects of Active Travel 
Active Travel involves making journeys by physically active means. Moray Council’s
Active Travel Strategy (ATS) aims to make active travel an attractive and realistic
choice for journeys to enable and encourage people to walk and cycle as part of their
daily lives. 
The Active Travel Strategy sets out overarching aims, objectives and actions as to how
Moray Council will seek to deliver high quality walking and cycling networks. It seeks
to increase publicity and awareness of these routes, in order to encourage more trips
by Walking and Cycling. This is our second ATS, with the previous one covering the
period from 2016 to 2021. 
The strategy is a 5 year plan from 2022 to 2027
that aims to harness the increase in walking and
cycling seen over the last 5 years. Having an up
to date and relevant strategy will enable us to
effectively continue to increase opportunities for
safe, attractive and enjoyable active travel. As
part of the strategy, six objectives have been
agreed, in consultation with key stakeholders,
community groups and individuals with an
interest in Active Travel. From these objectives an
action plan has been developed with detailed
steps that need to be carried out to achieve the
objectives. 
Equipment
Provision
Behaviour
Change
Education and
Training
Infrastructure
Provision
Page 28

Page 29

Moray Active Travel Strategy 2022 - 2027
3
Details of how the key actions will be delivered, along with timescales, are included
and will be subject to regular review. The ATS delivery will be through the Council’s
own programme of promoting sustainable and active travel, cross departmental
work with other areas of the council, in addition to the ongoing partnership
approach with external funders, the community and other interested parties. 
The ATS has also been developed following Sustrans “Active Travel Strategy Guidance”
2014. The guidance advises that this type of Strategy should include four key elements: 
An action plan
Walking and cycling infrastructure, including a network plan
Behaviour change, promotional and training activities
A monitoring plan 
Page 29

Page 30

Our Active Travel Strategy
4
Moray Active Travel Strategy 2022 - 2027
What is Active Travel? 
Active Travel simply means making journeys in
physically active ways. Be it walking, cycling or
wheeling to work and school, or other everyday
journeys you make to get from place to place such as
access to green spaces, shopping and visiting friends
and family, active travel can offer a convenient,
accessible and affordable way to move more. 
By supporting more people in Moray to walk, wheel,
and cycle for everyday journeys, we will improve
health, create safer communities, and reduce
environmental impacts.  
Why do we need a strategy? In this Strategy we aim to make active travel the natural
choice for everyday journeys across all our communities. This strategy builds on the
previous ATS and by providing clear objectives and actions seeks to enable
engagement with communities. An ATS keeps walking, wheeling and cycling at the
forefront of projects being delivered within Moray. The Strategy has been led by the
Sustainable Travel Officer, guided by feedback and support through an internal
working group, and public workshops with community groups and organisations with
an interest in Active Travel. The initial consultation has taken place to ensure the
proposed aims and objectives reflect the genuine needs and desires of existing
current and potential Active Travel users. 
The Scottish Government’s Cycling Action Plan for Scotland (CAPS) 2017 recommends
that every local authority in Scotland develops an Active Travel Strategy. Additionally
the 2014 National Walking Strategy 2 recommends the development and
promotion of high quality walking and cycling networks across
local authority areas. Moray Council has developed this
strategy to meet these recommendations. 
Page 30

Page 31

Moray Active Travel Strategy 2022 - 2027
5
1 https://www.pathsforall.org.uk/about-active-travel
‘To create a culture and
environment where active travel
is embedded within our
communities as the automatic
and obvious choice for everyday
journeys to school, work and
leisure by: providing a safe,
integrated and accessible
network for all.’
Active Travel and COVID-19
The Covid-19 pandemic has had a significant impact on active travel where we have
seen large increases in cycling and walking during the pandemic, both locally and
nationally. At the same time, however, some people have been working from home
and have lost fitness and confidence to reintegrate and leave their homes and have
deteriorated physically1. As we move forward from the pandemic there are
opportunities to use the increase in active travel to support those who have struggled
to stay active, so that everyone can feel the benefits of walking and cycling. However,
it is recognised that an increase in active travel is likely to be more difficult for some
groups, including those with long commuting distances, the socioeconomically
disadvantaged and the disabled. It is also essential to consider that some businesses
will be encouraging staff to work from home going forward. 
Vision Statement
At the start of this process an internal working group was set up to help update and
refresh the ATS. The purpose of the group was to work collectively to identify the
goals, aims and needs for a renewed ATS, whilst linking the vision to other relevant
local and national policies and strategies. The group comprised of officers from,
Transportation, Development Management, Strategic Planning and Development
along with a representative from HITRANS. A peer review and discussion took place
and a new vision was collectively developed for the future of Active Travel in Moray.
Following on from the consultation however, the Vision Statement was then revised
and collectively developed with consultees for the future of Moray. 
Page 31

Page 32

Policy Rationale
6
Moray Active Travel Strategy 2022 - 2027
Active travel is a key element in a number of national, regional and local strategies
and the development of our ATS has been informed by them. This ATS supports the
ambitions within Transport Scotland’s Active Travel Framework to improve the uptake
of walking and cycling across Scotland for travel. The strategy also sits alongside a
number of other policies and strategies within Moray Council, and both compliments
and strengthens the commitments being worked towards improving the quality of life
for people in Moray, and for Moray Council to become Carbon neutral by 2030. The
main related policies and strategies are outlined below: 
Moray Council Climate Change Strategy 2020
Moray Council Local Development Plan 2020 - Placemaking and Infrastructure and
Services Policies
Moray Council Corporate Plan 2019 - 2024
Moray Council Elgin Transport Strategy 2016
Moray Council Open Space Strategy 2018
Moray Council Road Safety Plan 2018 - 2022
HITRANS Active Travel Strategy 2018 (Draft)
Cycling Action Plan Scotland 2017 – 2020
National Walking Strategy 2014
A Long Term Vision for Active Travel in Scotland 2020 - 2030
Cycling By Design 2021
National Planning Framework 3 and 4
Strategic Road Safety Plan 2016
Public Health Strategy Scotland 2020 - 2023 
Page 32

Page 33

Moray Active Travel Strategy 2022 - 2027
7
The Moray Council Climate Change Action Plan has a number of actions which relate
to Active Travel and how we can tackle climate change together: 
1) Active Travel to School campaign and promotion, including parking
management around schools, and supporting modal shift from vehicles to
active travel wherever feasible 
2) Promotion of travel behaviour change through targeted programmes, including
Active Travel infrastructure measures from the Active Travel Strategy and
website information provision 
3) Develop and promote Travel Plans for Moray Council, major employers and
schools 
4) Ensure all new developments make provisions for Cycle Parking, including
secure cycle parking for flats and properties with no gardens. 
The National Planning Framework (NPF) is a long-term plan for Scotland that sets out
where national developments and infrastructure is needed to support sustainable
and inclusive growth. NPF3 was published in 2014, and NPF4 is currently in draft
status and will be a longer term vision to 2050 with fuller regional coverage and
improved alignment with wider programmes and strategies, including Active Travel
and infrastructure. 
The position statement for NPF4, as set out by the Scottish Government, is that a
significant shift is required if Scotland is to achieve net-zero emissions by 2045, as
climate change will be the guiding principle for all plans and decisions going forward.
Of particular interest within the NPF4 for the ATS, is the 20 Minute Neighbourhood
approach (having access to all goods and services we need within a twenty minute
walk or cycle from home), being the key development opportunity to influence the
way we plan places together with everyday local infrastructure to significantly reduce
the need to travel longer distances. The concept will explore how a new emphasis on
living locally could work in different parts of Scotland, from remote rural communities
to our towns and cities, taking into account the needs of everyone in society so that
equality is built in from the start. 20 minute neighbourhoods has the potential to
provide solutions to a range of problems such as the climate emergency, health
inequality and the decline of town centres. 
Page 33

Page 34

8
Moray Active Travel Strategy 2022 - 2027
The changes to NPF4 are intrinsically linked to Active Travel and infrastructure and
include: 
1. Building 20 minute neighbourhoods – Planning homes with everyday local
infrastructure including schools, community centres, local shops and healthcare to
significantly reduce the need to travel. This is not just about new buildings, but also
a change in a way that also helps to transform our existing places.
2. Removing the need for planning permission for active travel and electric vehicle
charging points to ensure that new infrastructure can be rolled out widely and
quickly.
3. Strengthening support for development in town centres and restricting out-of-
town retail and leisure to help transition away from car-dependent developments
towards those that enable walking, cycling, wheeling and public transport
accessibility. 
The Moray Council Road Safety Plan also highlights that pedestrians and cyclists are
the most vulnerable road users, albeit the number of pedestrians and cyclists injured
on Moray Roads are still very low. However, the Road Safety Plan reinforces the need
to provide Bikeability training across all our schools, as it not only increases children’s
confidence, but also gives them practical training on the road, improving their road
sense. The ATS has noted the importance of this, and as part of our objectives of the
strategy, included that 95% of primary schools will be delivering Level 2
Bikeability by 2027.  
These are just a few points that illustrate the importance of
the role that Active Travel plays within a range of policies
and strategies. Scotland’s Public Health Strategy 2020 –
2023 also puts great emphasis on Active Travel and its
importance to Public Health. It states that the
environment in which we live in and open spaces we
have access to contribute to differences in the health
and wellbeing of communities across Scotland. 
Scottish Government Investment
In order to deliver the strategy actions, which are
underpinned by Transport Scotland’s ‘Active Travel
Framework’, the Scottish Government allocate yearly
funding to partner organisations and Local Authorities.
Some partner organisations administer the grant funding to
deliver both infrastructure and behaviour change programmes.
Page 34

Page 35

Moray Active Travel Strategy 2022 - 2027
9
Below is a list of some of the main funds available to all local authorities for active travel
projects: 
Places for Everyone -  Sustrans
Smarter Choices, Smarter Places (SCSP) - Paths for All
Cycling Friendly Programme – Cycling Scotland
Bikeability – Cycling Scotland
E-bike grant and loans – Energy Savings Trust
Workplace engagement - Sustrans
School Cycle and Scooter Parking Grant – Sustrans 
Moray Council apply annually for SCSP, Places for Everyone and Bikeability grant
funding. Paths for All’s SCSP fund enables Moray Council to deliver behaviour change
initiatives each year to encourage less car use and more journeys by foot, bicycle,
public transport and car share. Cycling Scotland’s Bikeability fund is a cycle training
scheme designed to give children the skills and confidence they need both to cycle
safely on the roads, and to encourage them to carry on cycling into adulthood.  This
grant allows us to work towards having every primary school pupil in Moray between
P5 – P7 competent in level 2 on road cycling. 
The Sustrans Places for Everyone grant provides advice, support and funding for the
creation of infrastructure projects that make it easier for people to walk and cycle for
everyday journeys. This can range from feasibility studies and design, all the way
through to the construction stage of local projects, and is most likely to fund higher
cost projects. 
There are also smaller ad hoc grants available annually from our Regional Transport
Partnership, HITRANS, to deliver small scale infrastructure projects, such as
installation of bike repair stations and cycle parking. 
Finally, as part of the Local Government Settlement, the Scottish Government also
allocates all Local Authorities ‘Cycling Walking Safer Routes’ (CWSR) funds. The CWSR
fund is a ring-fenced grant from Transport Scotland, which is used to undertake works
for local cycling, walking and safer routes projects.  The CWSR award has increased
every year for the last 3 years from £131,000 in 2018 to £426,000 in 2021. Earlier in
2021 the Scottish Government announced that they have committed to ensuring that
at least 10% of the total transport budget goes on active travel by 2024-25, an
increase of some 7%. This additional funding will have a positive impact on the
Council’s ability to support the objectives and deliver the actions of the ATS.
Page 35

Page 36

10
Moray Active Travel Strategy 2022 - 2027
Moray is a rural local authority in North East Scotland which has a population of
95,8202, so for many local residents a private vehicle is an important means of getting
around; with walking and cycling being challenging for some journeys. Due to the
rural nature of Moray, car ownership levels are relatively high (86%)3 compared to
much of the rest of Scotland (72%)4. Nevertheless, there is evidence to show that
despite this Moray and the HITRANS region which has a larger amount of rural
settlements than most of Scotland, have relatively higher statistics for Active Travel as
a ‘main mode of travel’ than a large percentage of other local authority areas in
Scotland. 
Walking and Cycling Data
in Moray
2 National Record Statistics, June 2019
3 Scottish Household Survey 2019
4 Scottish Household Survey 2019
Table 1: Scottish Household Survey 2019 Travel Diary - Main mode of travel by
Council
Walking    Driver    Passenger  Bicycle    Bus       Taxi/       Rail   Other
car/van      car/van                                  minicab
Argyll & Bute              27              56                 8                 0            5             2             1          1
Eilean Siar                   18              60                12               0            6             0             1          3
Highland                     21              61                12               2            3             0             0          1
Orkney Islands          18              56                19               3            2             0             0          1
Moray 
Main Mode
of Travel
2019
220
23
1 15
0 58
TAXI
OTHER
Page 36

Page 37

Moray Active Travel Strategy 2022 - 2027
11
Walking     Driver   Passenger   Bicycle  Bus       Taxi/      Rail  Other
car/van    car/van                                minicab
Highlands & Islands       22              59               12                1          3            1            0         1
NE Scotland                     20              59               10                1          7            1            1         1
Zetland                              19              59               14                1          5            1            0         1
SE Scotland                      23              51               12                2          9            1            2         1
SW Scotland                     15              65               14                0          4            0            0         2
Strathclyde                      20              52               13                1          7            2            4         1
Tayside & Central           31              49                1                 1          5            1            1         1
Table 2: Scottish Household Survey 2019 Travel Diary - Main mode of travel by
Regional Transport Partnership Area:
Page 37

Page 38

12
Moray Active Travel Strategy 2022 - 2027
A large proportion of the population in Moray is concentrated around the main
settlements of Elgin, Forres, Buckie, Keith and Lossiemouth.  As such, this means that
whilst car ownership is higher here, there are still opportunities for many short trips
(under 5km) that can be made in and around our towns by walking and cycling for
work, education or leisure purposes. The 2011 census data shows that 64.6% of all
journeys within Moray are 5km or less which is an ideal length for making active
travel journeys. Therefore, a series of behaviour change programmes to encourage
and promote the use of the existing and future network for these journeys of 5km or
less is included within the actions for the ATS. 
Active Travel Journeys to Work
Much has been done in recent years to enable and encourage more active travel in
Moray, more of which will be discussed in the next section of the strategy, and in the
most part we can see that this has translated into more people walking and cycling to
work. However, there has been a drop in those numbers in the most recent data
published in the Annual Cycling Report 2021, this could be due in part to more people
working from home due to Covid-19. The national figure for Cycling to work is 4.9% in
Scotland, so despite any changes associated with the pandemic Moray is still above
average at 5.5%.  Going forward there will be a focus on what can be done to increase
levels back to, and beyond, 9%. 
Whilst there is no annual monitoring of walking journeys published in the way that
the annual cycling monitoring data is, the 2011 Census shows that 12.2% of journeys
to work in Moray were made by walking. Due to the Covid-19 pandemic there was no
Census completed in 2021, but is scheduled to take place in 2022 and once these
results are available they will be reported as part of the monitoring of the Strategy.
Diagram 1: Those Cycling to Work Usually/ regularly in Moray
9.1%8.7%
Annual Cycling
Monitoring Report 
2016
Annual Cycling
Monitoring Report
2019
Annual Cycling
Monitoring Report
2021
5.5%
Page 38

Page 39

Moray Active Travel Strategy 2022 - 2027
13
Active Travel Journeys to School
Travel to school data in Moray is mainly monitored through the Living Streets Travel
Tracker programme, as well as the Hands Up Scotland Survey (HUSS) done once a
year by the Scottish Government. 
Since 2015 Moray Council has been working with primary
schools to install the Living Streets Travel Tracker programme
through funding from the Scottish Government’s Smarter
Choices Smarter Places (SCSP) programme. Travel Tracker is an
interactive tool for recording how primary children travel to
school on a daily basis. It offers an incentive programme for
pupils to travel actively as well as related classroom resources
and integrates the recorded data into Curriculum for
Excellence activities. Travel Tracker not only provides data on
how the children travel on a daily basis rather than the once a
year snapshot of HUSS, but allows better comparison with
other local authority areas too. Data from Travel Tracker is also
useful when schools produce a travel plan as it is a ready
source of data on how the children travel to school as required
by the school travel plan. 
The data in the tables below are
taken from the 2021 Hands Up
Scotland Survey (HUSS) which is
part of the National Statistics
collected annually by the
Scottish Government. However,
the survey is carried out on one
day only each September and
can be subject to local variations
e.g. weather or other activities
taking place in school. The most
recent Active Travel to school
data in Moray for 2021 is at
52.3%, which is both higher than
the National average at 50.2%,
and the Highest in the HITRANS
region (see table 4) 
5 Annual Cycling Monitoring Report 2020
Page 39

Page 40

14
Moray Active Travel Strategy 2022 - 2027
Year         Walk         Cycle       Scooter     Park &      Driven         Bus           Taxi         Other                                                        
/Skate      Stride
2008         48.6%          6.1%          0.6%          5.7%         17.8%        19.0%         1.7%          0.5%
2009         49.6%          5.8%          0.6%          5.8%         18.3%        17.5%         2.2%          0.2%
2010         46.2%          5.1%          0.6%          6.0%         19.0%        20.9%         2.1%          0.1%
2011         45.9%          5.6%          0.6%          6.9%         17.0%        21.7%         1.9%          0.5%
2012         42.7%          5.0%          1.1%          5.9%         19.6%        23.1%         2.2%          0.4%
2013         44.8%          4.5%          2.3%          5.6%         19.7%        21.1%         1.9%          0.1%
2014         44.0%          5.0%          1.7%          5.4%         22.1%        19.9%         1.7%          0.1%
2015         42.8%          4.9%          2.5%          6.2%         21.3%        20.2%         1.9%          0.2%
2016         44.5%          4.9%          2.8%          8.1%         20.5%        17.4%         1.6%          0.1%
2017         43.1%          4.7%          2.1%          9.2%         20.8%        18.4%         1.5%          0.2%
2018         43.8%          5.6%          2.5%         11.0%        19.7%        15.9%         1.4%          0.1%
2019         42.9%          5.1%          3.5%         10.2%        19.5%        16.9%         1.8%          0.2%
2020         44.8%          4.7%          2.5%         10.7%        19.6%        16.0%         1.6%          0.2%
2021         44.0%          6.2%          2.1%         10.2%        20.1%        15.7%         1.6%          0.1%
Table 3: Moray Travel modes to school
Moray primary schools also have a high level of participation in Cycling Scotland’s
Bikeability Level 2 programme. Bikeability is the national cycle training programme for
school children that is designed to give children the skills and confidence they need to
cycle safely on the roads. Participation across primary schools has grown from 37% of
schools participating in 2018 to 75% in 2022. As well as Active Travel, any primary or
secondary school child in Moray who lives more than 2 miles (or 3 miles for some
secondary pupils in Elgin) from their catchment school, is entitled to free school
transport.  There are 629 (9%) and 1660 (31%) pupils in Moray currently entitled to
school transport. This reflects relatively well with the HUSS data showing that
currently in 2021 8% of primary pupils use school transport instead of being driven,
and 25% of secondary pupils.. 
Source: HUSS 2021, Sustrans
Page 40

Page 41

Moray Active Travel Strategy 2022 - 2027
15
Moray Data
As part of the ongoing monitoring of walking and cycling in Moray, the Council has a
number of locations where permanent counters are installed providing daily
information on the number of pedestrians and cyclists using the route. 
See Appendix 1.
Vehicle Counters
Cycle Counter Only
Cycle & Pedestrian Counters
Argyll & Bute
Eilean Siar
Highland
Moray
Orkney Islands
33.6%
12.2%
35.5%
44.0%
30.2%
3.8%
2.0%
8.4%
6.2%
5.8%
0.8%
*
1.9%
2.1%
0.7%
8.1%
2.3%
5.3%
10.2%
5.7%
P
Table 4: Travel modes by Local Authority in 2021
Source: HUSS 2021, Sustrans
Page 41

Page 42

16
Moray Active Travel Strategy 2022 - 2027
Moray has an expanding network of active travel routes that provide good
connectivity in parts of the region, particularly in some urban areas. However, cycling
and walking infrastructure needs further development if Moray is to have a
comprehensive network that offers real travel choices to everyone. Furthermore,
infrastructure alone is insufficient to bring about the change that is required if Moray
is going to meet the national targets for the number of journeys made by active travel
and must be supported by behaviour change and education/training programmes. 
Existing Active Travel
Over the years Moray Council has done a lot to improve accessibility and conditions
for those travelling by walking and cycling, through both the provision of
infrastructure and behaviour change initiatives. 
The recent Elgin City Centre Masterplan consultation has shown Active Travel to be a
top priority in shaping the thinking of the redesign of Morays main settlement. It
envisages the City  Centre as becoming a much more people focussed, rather than a
car-focussed place, in recognition of the fact that vehicles currently dominate the City
Centre streets and that this negatively impacts on the attractiveness and safety of
walking and cycling. A change in travel behaviour is therefore desired, away from the
dominance of the private car towards more walking, cycling and public transport use. 
Moray Council have delivered in the past, and are currently engaged in a range of
behaviour change initiatives to promote active travel in the region, which this strategy
can build on and enhance. Notable examples include: 
Since 2015 Moray Council has been
delivering the ‘WOW Walk to School
Challenge’ programme across primary
schools in Moray. This initiative is led by
Living Streets, the everyday walking charity.
WOW is a pupil-led initiative where children
self-report how they get to school every day
using the interactive WOW Travel Tracker. If
they travel sustainably once a week for a
month, they get rewarded with a badge. 
In 2017 an Active Travel Street Art Project, ‘789 Route Maps’ was developed by
NADFLY, an artist studio that specialises in place making and social engagement.
Colourful glyph signs (symbols that conveys information non verbally) were
erected across Elgin to create new walking routes, aimed at encouraging children
and families to get more active and out and about more, and getting walkers to
rediscover quieter paths and cul-de-sacs away from busy roads. 
Page 42

Page 43

Moray Active Travel Strategy 2022 - 2027
17
In 2019 a new Employee Cycling Challenge
initiative was run in partnership with Love to
Ride. ‘Love to Ride Moray’ was an online platform
designed to get more people across the region
cycling to and from work. It included a full
programme of cycling behaviour change and
engagement activities to create a local business
and community engagement programme that
had incentives and rewards for cycling. 
Parksmart Moray was developed in 2020, but
due to the Covid-19 pandemic was put on hold
until the beginning of 2021. Parksmart is a Road
Safety and Active Travel initiative which aims to
reduce congestion and improve safety at the
school gate. The purpose of Parksmart is to get
parents to think about their behaviour whilst
actively promoting walking to school or park and
stride as the easier, safer and most stress-free
option. Since its launch, 2 schools have
participated, and there is increased demand to
run at many other primary schools. 
In 2021 Moray Council began working
in partnership with Cycling UK to bring
together ‘The Moray Bothy’
programme.  It is part of the Cycling UK
Bothy programme, which works with
local communities to bring together
organisations that promote walking
and cycling activities and providing any
additional opportunities that are
required to help people get active on
wheels or by foot, particularly in the
aftermath of Covid-19 restrictions. The
programme focuses on promoting
accessible and inclusive cycling and
walking opportunities, supporting
residents primarily, and eventually
visitors to the area. 
Page 43

Page 44

18
Moray Active Travel Strategy 2022 - 2027
Sanquhar Road, Forres (2016) – Shared use cycle
track built on Sanqhuar Road, alongside Applegrove
primary to Forres Academy through Roysvale Park 
Reiket Lane, Elgin (2017) - Widened existing
pavement from the A96 to the Elgin Golf Club
avoiding on road cycle routes, to create shared use
path the whole way 
River Lossie Cycle Path, (2017) – A new cycle route
from the A96 at Old Mills road in the west all the
way to Lhanbryde in East along flood embankment 
Buckie A942, (2017) – Traffic lights on High Street to
enable safe and accessible crossings for pedestrians 
Hay Street Traffic Lights, Elgin (2018) - Has provided
dedicated crossings for pedestrians on busy section
of A941 
School Brae, Lossiemouth (2019)– Traffic lights at
bottom of School Brae to enable safe and accessible
crossings for pedestrians, and additional cycle
green lights to allow cyclists priority over traffic 
A95 Banff Road, Keith (2020) - Provision of shared
use path from school road to new nursery, including
a pedestrian crossing 
Moray School Streets Pilot Project (2021) - Roads
around two Elgin primary schools closed off to
vehicles at drop-off and pick-up times during term-
time, as part of a new pilot project. Following a
review of surveys and traffic/ pedestrian data
throughout the trial, the scheme was approved to
be made permanent from September 2022. 
As well as behaviour change, there have been many successful small and large scale
infrastructure projects delivered across Moray in the past. Notable infrastructure
projects since 2016 are:
Page 44

Page 45

Moray Active Travel Strategy 2022 - 2027
19
A project of particular
significance that has been
ongoing since 2018 is the
creation of ‘The Speyside Low
Carbon Hub’. The hub and path
project is sited in the heart of
Scotland's Speyside area, and
aims to make a step change in
the use of low carbon transport
modes in a number of different
ways. The project was awarded
funding from the European
Regional Development Fund
(ERDF) Low Carbon Travel and
Transport Challenge Fund, and
Transport Scotland.
The first phase of the project was completed in
December 2019 and has seen major path
improvements of over 10km of the Speyside Way
between Craigellachie and Carron; three new
electric vehicle charge points at Aberlour,
including two ‘rapid’ chargers (one of which will
be dedicated for charging public transport
buses) and a third, fast charger for the dedicated
use of the Moray Carshare membership; electric
car and e-bike hire services from Moray
Carshare; and bike repair stations at key points
along the Speyside Way. 
Due to the success of the first phase
improvements and the increased use of the
route, Moray Council secured further funding
from ERDF to make additional improvements to
the Speyside Way. Phase 2 of the project begun
construction work in early Spring 2022, and was
completed in July 2022. This includes a further
upgrading of 10.5km path from Carron to
Cragganmore, and provides a high quality active
travel route to access Aberlour and Craigellachie
for a number of smaller settlements, individual
properties and businesses.
Page 45

Page 46

20
Moray Active Travel Strategy 2022 - 2027
Pedestrian and cycle numbers on the first phase of the path improvements more
than doubled between July 2019 and July 2020. The increasing upwards trend has
continued into 2022 data. See appendix 2 for data. 
Furthermore, new cycling and walking infrastructure has been secured through the
use of planning conditions for new developments, amongst others, in the south of
Elgin, south of Forres and west of Buckie including the replacement of a pedestrian
bridge over the river Mosset, which provides enhanced Active Travel access to Forres
Academy and Applegrove Primary. 
Despite our successes, there is more that can be done, and through this ATS we will
continue to encourage people to think about the type of journey they are making and
consider if it can be made by foot or bike. By doing so, we are seeking to change
social norms so that all Moray residents consider active travel choices to be relevant
and desirable alternatives to the car. 
Moving forward the ATS Action Plan includes the development of Active Travel
masterplans for key settlements. These masterplans will include a costed action plan,
to deliver placemaking and infrastructure interventions to make active travel the
obvious choice for everyday journeys based on the 20-minute neighbourhood
concept. This will link in with the National Planning Framework 4 concept of 20
minute neighbourhoods across our cities, towns, and rural areas so that the places
where we live and work are more resilient and sustainable. Active Travel will be an
important layer within these neighbourhood plans. 
The masterplans will form a basis for identifying opportunities for improvement to
existing networks, identifying gaps and seeking to provide new infrastructure to close
those gaps. It will also help demonstrate what is required in relation to new
development, as part of the review of the Moray Local Development Plan which
commences in 2022. Engagement for the masterplans will be undertaken in
partnership with the communities to ensure any proposed changes or additions are
agreeable. Key stakeholders within each community will be local businesses, schools,
leisure facilities, Community Councils, community groups representing the various
characteristics, with a special focus on disability, age and sex, existing active travel
groups, third sector organisations and Council Members. The masterplans will be a
cross-departmental collaboration within the council in order to successfully develop
them. 
Work is progressing on the development of detailed Active Travel mapping of existing
routes which are available for use by cyclists, and by extension pedestrians. We are
also in the process of assessing potential Active Travel routes as identified through
the consultation process, and by officers and stakeholders. 
Page 46

Page 47

The Benefits of Active Travel
Moray Active Travel Strategy 2022 - 2027
21
Active Travel brings many obvious benefits to both communities and individuals.
Investment in Active Travel has positive outcomes for public health, social inclusion,
reducing the environmental impact of transport and for supporting local economic
activity. By choosing to walk or cycle over private vehicle use, it delivers a low cost,
high return for society as a whole and on individual health. 
For the Environment
Through the Climate Change Scotland Act 2019, the Scottish
Government has set a legally-binding target to cut
greenhouse gas emissions to net-zero by 2045. Changing to
Active Travel can play a significant role in helping to
achieve this.  The largest benefit comes from changing
from car use to active travel for business, social
and commuting journeys. In 2018, Transport
(excluding International Aviation and Shipping) was
the largest source of net emissions in Scotland,
followed by business and agriculture6. Data published
by the Department for Business, Energy and Industrial
Strategy 2019 shows that whilst emissions in general
have fallen across Moray from domestic, industry and
commercial use between 2005 and 2015, there has been
an increase in Transport emissions from 160kt CO2 in
2005 to 165kt CO2 in 2018. Greater investment and
promotion of active travel is an effective way of reducing
Moray’s transport emissions, meeting Government targets, and
providing a cleaner local environment. 
For the Economy
Walking and cycling are cheaper and more
accessible forms of transport, and through
investment in infrastructure, and promotion of
Active Travel it can lead to an increase in local
economic growth. Those walking, wheeling and
cycling tend to spend more money locally than
drivers, especially in retail areas7. People in
pedestrianised areas have more time to “stop,
look, and spend without the hassle of navigating
busy roads and worrying about traffic”8. 
6  https://www.gov.scot/publications/scottish-greenhouse-gas-emissions-2018/pages/3/
7 Sustrans, Active Travel and Economic Performance Review
8 Sustrans 2013 Retail vitality Report
Page 47

Page 48

22
Moray Active Travel Strategy 2022 - 2027
Having good infrastructure in place for walking
and cycling leads to higher footfall in town
centres, and more time spent in shops than
those who drive. A case study within Living
Streets ‘Pedestrian Pound 2018’ document
showed that following a £10 million investment
in Stoke-on-Trent’s city centre to make the area
more pedestrian-friendly, it increased footfall by
30%. Measures such as widening footways,
replacing existing footway surfaces, installing
trees and seating were introduced and have
encouraged large numbers of people back to the
town centre. 
Organisations with higher levels of staff who travel to work by walking or cycling also
have higher productivity levels and reduced absentee levels. 
For Health
Increasing levels of physical activity is central to improving the nation’s health and
wellbeing. Active Travel has a major role in encouraging physical activity. The National
Walking Strategy 2014 highlights that physical inactivity results in
around 2,500 premature deaths in Scotland each year, costing
the NHS around £91million annually. 
Active Travel, when compared with other forms of
exercise, is one of the easiest ways to incorporate
physical activity into our everyday lives. The NHS
recommends that adults do a minimum of 150
minutes of exercise a week, and children do a
minimum of 60 minutes per day. The most recent
Scottish Health Survey 2019 shows that the
proportion of children (aged 2–15) who met the
recommended physical activity level in Scotland
was the lowest since 2008 at 69%, and only 66% of
adults met the minimum recommendation. In the
North East of Scotland 1 in 5 children (aged between
2 and 15) and 2 in 5 adults in the North East are not
meeting the national guidelines for physical activity9. 
The NICE Physical
activity in the
Workplace Report
2008, states that
‘Workers that
undertake physical
activity take 27%
fewer sick days’.
9 Scottish Health Survey 2019
Page 48

Page 49

Moray Active Travel Strategy 2022 - 2027
23
By changing the way we travel for work,
education and leisure through walking and
cycling, instead of car use, it can help contribute
to a healthier lifestyle. Communities that have
good walking and cycling links, help to provide
easy healthy lifestyle choices for us all to make
active travel part of our daily activity. 
Walking and cycling, like many outdoor activities,
is good for our physical and mental health.
Switching more journeys to Active Travel will
improve health, quality of life and local
productivity whilst at the same time reducing
costs to the public purse. These are substantial
win-wins that benefit the individual and the
community of Moray as a whole. 
In our Active Travel Consultation the following benefits were highlighted by
respondents; 
All abilities paths
would encourage
people with disabilities
I feel with a young family
we would be more
inclined to do active
travel to keep healthy
It would benefit the
many more elderly
expected in moray,
this is vital to make
more inclusivePrioritising ‘active’ users
would benefit everyone
Page 49

Page 50

Objective Setting
24
Moray Active Travel Strategy 2022 - 2027
The objectives for the ATS have been developed through alignment with national,
regional and local policies. The overarching aims of the strategy are to deliver
increased levels of cycling and walking to education and work, and an increase in
provision of physical infrastructure across Moray.  A number of SMART objectives
have been developed to enable these aims to be delivered, which is linked to an
action plan, contained within Appendix 3. The aims help connect and achieve the
overall vision of the ATS, ‘To create a culture and environment where active travel is
embedded within our communities as the automatic and obvious choice for everyday
journeys to school, work and leisure by: providing a safe, integrated and accessible
network for all.’ 
Objective Setting Process
Following a review of existing national, regional and local policy documents and
guidance, an online consultation workshop was held on the 3rd September 2021 with
the aim of bringing together key stakeholders to discuss the priorities for active travel
in Moray. Discussions took place around the differing priorities for different
communities within Moray. Some of those who attended were representing the
smaller more rural villages, so highlighted the need for long distance routes
connecting settlements, whilst others brought up the need to link up existing parts of
the network in our larger towns. The highest priorities that were raised by the group
were: 
Community engagement throughout projects
Long term maintenance of un-adopted paths 
Dedicated space for cycling and walking (reallocated from existing road space
where appropriate) 
Cycle parking and facilities at destinations 
Road closures around school zones 
Marketing promotion and signing of routes  
Speed limits and traffic calming. 
It was also clear from the workshop that it was essential for the Council and
Community to work together at all stages of project development, from design
through to implementation. Amongst those who attended there was representation
from Moray Transport Forum, Cycling UK, HITRANS, Community Councils, NHS
Grampian, Moray Council Officers, Outfit Moray as well as other individuals and
groups with an interest in cycling and walking. 
Page 50

Page 51

Moray Active Travel Strategy 2022 - 2027
25
Aims and Objectives
There are 3 simple overarching aims for this strategy, to increase cycling and walking
journeys to work, to increase cycling and walking journeys to education and to
increase the provision of physical infrastructure. These aims are quantified in six
specific objectives focused around the provision of infrastructure and facilities,
meaningful travel planning, skills training and education.   
In order for the objectives to be achievable they needed to be specific, measurable,
achievable, relevant and timed; SMART. Our detailed objectives have therefore been
developed with these key points in mind and will allow for more effective planning
and monitoring of the ATS action plan. The objectives have also been established
using insight, and workshop feedback from these organisations and individuals that
are currently involved in helping to promote walking and cycling in Moray. 
Each of the objectives are supported and linked to one or more actions in the Action
Plan and are listed in order, see Appendix 3. 
Page 51

Page 52

26
Moray Active Travel Strategy 2022 - 2027
Active Travel Strategy Aims
AIM - Increase in provision of
Physical Infrastructure 
INFRASTRUCTURE 
1) Objective - Increase
AT on the public road
network with an extra
5% infrastructure over
the next 5 years – 
2) Objective - Increase
use of NCN1* route by
pedestrians and
cyclists by 2% on a
year by year basis
from 2022 to 2027
* National Cycle
Network 1 is a
1264mile cycle route
along the east coast
of UK, cared for by
Sustrans. 
3) Objective - Ensure all
major transport
connections and
destinations
(interchanges) and
businesses have
appropriate cycle
parking* installed by
2025. 
* please refer to Cycling
by Designs
appropriate cycle
parking. All
installations will be in
line with this guidance.
www.transport.gov.sco
t/media/50323/cycling-
by-design-update-201
9-final-document-15-
september-2021-1.pdf
AIM - Increase in
walking and cycle
journeys to education 
EDUCATION 
5) Objective - 95% of
primary schools
delivering Level 2
Bikeability by 2027.
(Current baseline
figures - 75% of
primary schools
delivering 2022,
with a 67%
completion rate) 
6) Objective - 60% of
all journeys to
school to be walked,
wheeled or cycled
by 2027.
(Current baseline
figures from HUSS
2021 - 52.3%) 
AIM - Increase in
walking and cycle
journeys to work 
WORK 
4) Objective - All large
employers (over
250) to have a
completed an up to
date live Travel Plan
Document by 2027. 
Page 52

Page 53

Moray Active Travel Strategy 2022 - 2027
27
Delivering the Strategy
To deliver the vision and objectives of the ATS, a 5 year Action Plan has been
developed with clearly defined actions which will be measured and reported on
regularly to provide evidence of progress towards the objectives. A copy of the ATS
Action Plan can be found in Appendix 3. Data on walking and cycling activity levels is
available from local and national sources and will be used to measure progress in the
overall uptake of walking and cycling. The main actions from the plan are: 
1 Further develop the Active Travel network 
2 Develop Active Travel Masterplans for key settlements in Moray 
3 Embed Active Travel opportunities within new developments 
4 Encourage and facilitate walking and cycling as leisure and tourist activities to
provide benefits to health and local economy 
5 Provide new/improved cycle parking/ facilities at key destinations and transport
interchanges in Moray 
6 Work with local employers (including Moray Council) and their staff to encourage
more walking and cycling to and from work 
7 Work with students and school pupils, staff and parents to encourage more
walking, cycling and scooting to and from school/ further education 
8 Continue to seek funding from existing sources and identify new funding
opportunities as they emerge to secure funding for Active Travel interventions, as
appropriate. 
Page 53

Page 54

28
Moray Active Travel Strategy 2022 - 2027
Monitoring of the plan
A monitoring plan is an essential part of an ATS and is one of the key requirements
outlined in guidance published by Sustrans and Transport Scotland. It is important to
ensure an effective monitoring and evaluation framework is in place for assessing
progress in delivering the vision and objectives of the Strategy.  To deliver the vision
and objectives of the strategy a 5 year Action Plan, see Appendix 3, has been
developed with clearly defined actions and planned outcomes which will be
measured and reported on regularly to provide evidence of progress towards the
objectives. 
The outcome measures will be reviewed annually, and a RAG report created at the
start of each financial year, to ensure they are fit for purpose to monitor progress on
actions for the duration of the strategy. An Action Plan progress report will then be
produced on an annual basis and reported to the relevant Council Committee as
required. Although annual reporting on the Action Plan will be managed by the
Sustainable Travel officer, delivery of the targets within it will rely on continual input
and partnership working from within relevant Moray Council departments, external
partners and funding bodies, local businesses and  residents to highlight, inform and
provide feedback on how improvements can be made.   
Active Travel monitoring is already undertaken by Moray Council through a number of
various data sources, and the strategy monitoring plan will link existing data sources
with new opportunities. Programmes such as Travel Tracker in primary schools
already adds to the data gathered as to how people are travelling along with the
annual Hands Up Scotland School (HUSS) surveys. Other programmes under SCSP
also provide data on the number of participants or types of journey made adding to
the overall picture of active travel in Moray. This kind of data feeds in to local
reporting, e.g. Moray Council performance indicators as well as into national statistics
e.g. HUSS & Sustrans national monitoring of walking and cycling. Using local data
allows the council to monitor regional trends and to spot where problems might be
occurring by observing a fall in usage figures. Conversely, achieving an increase in
usage shows the success of both infrastructure and intervention programmes in
encouraging people to travel actively. Additionally, all new infrastructure includes
automatic counters so this monitoring will continue to provide usage data. 
In addition to collecting data on the number of journeys made it is important that
monitoring of the active travel programmes also takes place to determine their
success or otherwise and to inform the Council as to what measures are most likely
to achieve the required modal shift to active travel. It is also important that a
programme of monitoring the delivery of the ATS is implemented using key
performance indicators (KPI) to determine the success of the strategy.
Page 54

Page 55

Moray Active Travel Strategy 2022 - 2027
29
KPI 1: Modal share of active travel journeys to education
KPI 2: Modal share of active travel journeys to work
KPI 3: Number of active travel journeys recorded at fixed site counters
KPI 4: Length of new active travel routes developed on:
1) Public Road Network
2) Core Path Network 
A number of measures below will be undertaken and assessed at regular intervals
with regular reporting. An Action Plan progress report will be produced on an annual
basis and reported to the relevant Council Committee as required. 
Existing Data Source 
Scottish Census 
Scottish Household Survey 
HUSS (Hands up School
Survey) 
Travel Tracker 
Bikeability 
Automatic Counts 
Manual Counts 
Cycle Parking Provision 
Spend/ Cost Reporting 
Sustrans Route Surveys
Measure 
Percentage of Journeys to work by foot
and cycle 
Percentage of Journeys to work by foot
and cycle 
Percentage of Journeys to education
by foot and cycle 
Percentage of Journeys to education
by foot and cycle 
Cycle Training – no of pupils trained 
Pedestrian and cycle counts 
Pedestrian and cycle counts 
Infrastructure provision 
Active travel spend (infrastructure and
behaviour change) 
Qualitative NCN1 journey info
Frequency 
Every 10 years
(next census 2022) 
Annually 
Annually 
Quarterly and
Annually 
Annually 
Annually/ Adhoc 
Adhoc 
Annually 
Annually (March) 
Adhoc
Page 55

Page 56

30
Moray Active Travel Strategy 2022 - 2027
Partnership and Funding 
Partnership working and funding are important elements in the delivery of Active
Travel projects. Some of the plans can be delivered directly by Moray Council, others
will mean working in partnership with Scottish Government, national and local
bodies, communities and the private sector. Achieving our vision will require
resources, time and investment. Funding for infrastructure and soft
measures/behaviour change programmes comes almost exclusively from external
agencies, as mentioned earlier on in the document in ‘Scottish Government
Investment’. 
The majority of larger active travel infrastructure projects in Moray will be funded
through the annual CWSR grant, an application to the Sustrans ‘Places for Everyone’
fund or in certain instances through the use of developer obligations (or the provision
of new infrastructure as part of new developments). All behaviour change initiatives
will be funded through Paths for All’s ‘Smarter Choices, Smarter Places’. There are
other small grants available to help support the delivery of our smaller actions, and
these will be utilised and applied for whenever possible. Longer term funding for
revenue, maintenance and marketing can be a challenge, but working closely in
partnership with all relevant organisations working towards a modal shift to Active
Travel will be beneficial for our vision and goals of the strategy. 
To ensure that the strategy remains relevant and accounts for any policy changes
made at national and regional level, it will be subject to an annual review.
New Data Source 
Monitoring Progress Report 
Active Travel provision
within new development 
Public Perception Survey on
Active Travel in Moray 
Workplace Travel Surveys
Measure 
Progress against objectives and
actions 
Infrastructure provision, (km of new
paths, provision of new cycle storage), 
Level of public knowledge of Active
Travel health and wellbeing benefits
Public views on cycle parking facilities
(and other Active Travel views as
specific questions emerge) 
Journeys to work 
Frequency 
Annually 
Annually 
Bi-Annually 
Adhoc 
Page 56

Page 57

Moray Active Travel Strategy 2022 - 2027
31
Equality Impact
The Equality Act 2010 introduced a Public Sector Equality Duty (PSED) requiring
public bodies to give due regard to the need to:  
Eliminate unlawful discrimination
Advance equality of opportunity
Foster good relations  
To guide the ATS development and understand where we were starting from,
public and stakeholder virtual engagement events were organised with key
stakeholders, community groups and individuals with an interest in Active Travel.
The aim was to gather views on barriers and issues preventing travelling more
actively in Moray, and how we can make all forms of Active Travel attractive and
accessible to everyone. Choices around active travel are affected not only by the
existence of safe walking and cycling routes, but other factors such as accessing a
cycle, skills and confidence, security concerns, or individual health conditions. 
An overwhelming majority of respondents to the consultation felt that there
would be no impacts of the strategy that would be a disbenefit to any particular
group such as older people or those with a disability. Most individuals thought
that it could only be of benefit to everyone, as it allows people more transport
choices to access things they need such as work, education, food, health services
and leisure. The recently upgraded Speyside Way path was used as an example of
the diverse range of individuals and groups now using it since the works were
completed. Having more active travel routes was felt to only benefit communities
especially those on lower incomes, women and children. 
Despite the general feedback to the consultation being that there was not much
further that could be included within the Strategy which would ensure it was
inclusive for all and inequalities addressed, some additional actions were
proposed such as; 
Larger cycle racks for trailers and buggies to be parked
Reasonably priced bike hire and disability equipment hire
Seats and toilets strategically placed on routes
Cycling for disabled people i.e. tandem hire and cycle buddy schemes
Better maintenance of existing paths for all ability users to use
Secure cycle storage at ground level for those without a garden (flats etc.)
Page 57

Page 58

32
Moray Active Travel Strategy 2022 - 2027
We intend to address these proposals through the strategy by delivering cycle training
and maintenance sessions to support people to develop skills, knowledge and
confidence, and by looking at whether any new active travel infrastructure should be
prioritised around areas of disadvantage, using SIMD data.  The provision of new
shared use paths when developing the network in Moray, will also create better
accessibility for wheelchair users. As well as new infrastructure, the inclusion of a
maintenance plan on the current, and new, network will further enhance equality for
access to Active Travel. Anecdotal evidence suggests that more women tend to walk
or cycle to access local services such as schools and hospitals, therefore, may help to
reducing the gender pay gap. 
Currently 85% of people aged over 65, 78% of disabled people, 76% of women, 75% of
people at risk of deprivation and 74% of people from ethnic minority groups never
cycle. (Sustrans/ Arup 2019). Through the strategy action plan, we aim to help deliver
on outcomes in Scotland’s ‘National Performance Framework’ that 'we live in
communities that are inclusive, empowered, resilient and safe' and 'we tackle poverty
by sharing opportunities, wealth and power more equally' partly through the use of
Participatory Budgeting. PB is a way for people to directly vote on how local money
should be spent, and we aim to use a proportion of our Cycling Walking Safer Routes
Scottish Government grant fund to provide new and improved cycle parking. Through
involving the public and communities on where infrastructure is needed and
identifying locations, it is hoped this will increase confidence and safety in more
people cycling. 
The more we do to build the knowledge, skills and confidence of people of all ages
and abilities, the more active journeys we will unlock. We will continue to work
collaboratively with established community organisations to tackle inequalities and
barriers that people face, and deliver programmes to members of our communities
who currently walk and cycle less, to support diversity, inclusion and equality.
Page 58

Page 59

Moray Active Travel Strategy 2022 - 2027
33
Appendix 1 - Moray Data
Hopeman - Burghead
Year
2018
2019
2020
2021 
Elgin - GM
Year
2018
2019
2020
2021 
Elgin - Library
Year
2018
2019
2020
2021 
Elgin - Halfords
Year
2018
2019
2020
2021 
AADT
32
33
49
48 
AADT
26
27
56
54 
AADT
68
63
63
63 
AADT
90
121
110
213 
Growth D
10.34%
3.13%
48.48%
-2.04% 
Growth D
-13.33%
3.85%
107.41%
-3.57% 
Growth D
17.24%
-7.35%
0.00%
0.00% 
Growth D
57.89%
34.44%
-9.09%
93.64% 
AADT
127
132
159
189 
AADT
204
199
225
226 
AADT
547
510
327
404 
AADT
544
477
295
246 
Growth D
5.83%
3.94%
20.45%
18.87% 
Growth D
-0.49%
-2.45%
13.07%
0.44% 
Growth D
0.92%
-6.76%
-35.88%
23.55% 
Growth D
-5.88%
-12.32%
-38.16%
-16.61% 
This is a summary of the Annual Average Daily Traffic (AADT) across our counters over
3 years, which on the whole shows the trend for walking and cycling locally on the
increase.
Bikes People
Page 59

Page 60

34
Moray Active Travel Strategy 2022 - 2027
Elgin - Shaw Place
Year
2018
2019
2020
2021 
Elgin - Cathedral
Year
2018
2019
2020
2021 
Elgin - Chanonry
Year
2018
2019
2020
2021 
Elgin - Morriston Playing
fields
Year
2018
2019
2020
2021 
Growth D
7.78%
24.74%
7.44%
0.00% 
Growth D
24.00%
14.52
66.2
-34.75% 
Growth D
11.29%
2.90%
91.55%
-29.41 
Growth D
20.00%
-2.78%
131.43%
-39.51% 
AADT
209
169
162
156 
AADT
76
81
108
105 
AADT
56
68
118
106 
AADT
175
190
288
315 
Growth D
3.47%
-19.14%
-4.14%
-3.70% 
Growth D
4.11%
6.58%
33.33%
-2.78% 
Growth D
9.80%
21.43%
73.53%
-10.17% 
Growth D
6.06%
8.57%
51.58%
9.38% 
Bikes People
AADT
97
121
130
130 
AADT
62
71
118
77 
AADT
69
71
136
96 
AADT
36
35
81
49 
Page 60

Page 61

Moray Active Travel Strategy 2022 - 2027
35
Elgin - Leisure Centre
Year
2018
2019
2020
2021 
Elgin -
Red Bridge East - West
Year
2018
2019
2020
2021
Elgin - Red Bridge 
North-South
Year
2018
2019
2020
2021 
Elgin - Waulkmill
Year
2019
2020
2021 
Growth D
5.77%
12.73%
80.65%
-57.14% 
Growth D
9.33%
4.88%
52.33%
-42.75% 
Growth D
4.29%
-1.37%
72.22%
-24.19% 
Growth D 
112.50%
-45.10% 
AADT
183
210
311
1888 
AADT
353
380
434
446 
AADT
605
606
582
597 
AADT
129
151
109 
Growth D
5.78%
14.75%
48.10%
507.07% 
Growth D
7.62%
7.65%
14.21%
2.76% 
Growth D
6.51%
0.17%
-3.96%
2.58% 
Growth D 
17.05%
-27.81% 
Bikes People
AADT
55
62
112
48 
AADT
82
86
131
75 
AADT
73
72
124
94 
AADT
24
51
28 
* These are tube bicycle counters only. They do not collect pedestrian data.
Page 61

Page 62

36
Moray Active Travel Strategy 2022 - 2027
Elginshill
Year
2018
2019
2020
2021 
*Forres - Kinloss
Year
2018
2019
2020
2021 
*Kinloss - Findhorn
Year
2018
2019
2020
2021 
*Elgin - Lossiemouth
Year
2018
2019
2020
2021 
Growth D
15.79%
-3.03%
85.94%
-27.73% 
Growth D
20.00%
-11.11%
14.58%
-12.73% 
Growth D
13.75%
-4.40%
32.18%
-18.26% 
Growth D
23.33%
-16.22%
43.55%
-16.85% 
Bikes People
AADT
66
64
119
86 
AADT
54
48
55
48 
AADT
91
87
115
94 
AADT
74
62
89
74 
* These are tube bicycle counters only. They do not collect pedestrian data.
Page 62

Page 63

Moray Active Travel Strategy 2022 - 2027
37
*Cullen
Year
2018
2019
2020
2021 
*Garmouth
Year
2018
2019
2020
2021 
*Duffus - Hopeman
Year
2018
2019
2020
2021 
Growth D
-15.38%
27.27%
78.57%
-20.00 
Growth D
12.00%
7.14%
46.67%
-20.45% 
Growth D
11.76%
-5.26%
88.89%
-23.53% 
Bikes People
AADT
11
14
25
20 
AADT
28
30
44
35 
AADT
19
18
34
26 
Page 63

Page 64

38
Moray Active Travel Strategy 2022 - 2027
2019
Jul
Aug
Sep
Oct
Nov
Dec
Ave daily 
total 
2020
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Ave daily 
total
67
57
54
39
27
35
46.5 
45
43
44
50
52
98
183
79
58
66
44
37
67 
Fiddich Park Aberlour ParkCraigellachie 
Hotel
Carron
The above figures are averaged out daily Mon-Sun.
Notes:
Fiddich Park June missed (Dead battery)
Fiddich Park July average from 14th onwards (Dead battery)
Craigellachie Hotel up to 22/07 (Dead battery)
October average up to 19/10
60
18
11
22
8
7
21 
12
7
13
33
53
59
54
44
38
19
13
12
30 
62
38
31
48
30
35
41 
45
47
46
53
47
63
64
65
57
67
44
44
54 
53
46
34
20
4
5
27 
8
5
12
50
77
80
85
78
46
24
15
8
41 
84
79
71
68
56
60
70 
63
63
82
100
108
135
154
158
116
113
86
80
105 
15
18
18
15
7
6
13 
7
5
11
36
54
55
55
48
33
21
13
7
29 
18
31
22
10
4
6
15 
10
10
12
18
18
23
25
25
21
19
13
11
17 
6
34
26
9
3
4
14 
4
3
9
29
39
36
40
39
24
14
10
5
21 
Appendix 2 - Speyside Data
Page 64

Page 65

Moray Active Travel Strategy 2022 - 2027
39
2021
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Ave daily 
total
37
53
60
63
76 
56
60
59
98
44
35
59
Fiddich Park Aberlour ParkCraigellachie 
Hotel
Carron
5
12
27
26
29 
86
68
44
45
9
8
32
44
58
87
70
86
97
95 
77
3
15
15
20
25
52
58 
27
89
102
126
123
120
169
154
158
116
144 
130
2
14
24
29
30
50
49
42
33
22 
30
19
23
31
34
34
33
40
59
49
65
15
12
35
1
9
13
13
12
30
23
8
5
7
4
6
11
The above figures are averaged out daily Mon-Sun.
Notes:
Fiddich Park June missed (Dead battery)
Fiddich Park July average from 14th onwards (Dead battery)
Craigellachie Hotel up to 22/07 (Dead battery)
October average up to 19/10
2022
Jan
Feb
Mar
Apr
May
Jun
Ave daily 
total
55
48
45
70
58
382
109 
14
12
32
27
53
44
30 
65
73
88
102
95
85 
4
11
9
16
30
14 
94
112
119
138
128
118 
10
22
23
32
37
25
26
16
27
52
42
40
33
3
2
6
5
7
9
5
Page 65

Page 66

Action and TasksAction
Number
Outcome
Measure
TimescalePlanned Outcome Lead
(supported by)
Action and TasksAction
Number
Outcome
Measure
Planned Outcome Lead
(supported by)
Further develop
the Active Travel
network 
Seeks to meet
Objective 1 - 
Increase the AT
network with an
extra 5%
infrastructure over
the next 5 years 
a) Identify network of routes,
including the identification
and integration of the Core
Path Network, that connect
communities where ‘every
day’ journeys could be
made by cycle or foot 
b) Develop an online system
where the public can
identify new active travel
routes and/or enhancement
to existing routes, and
promote its use.
c) Develop a set of criteria,
which includes landowner
support, to enable the
prioritisation of new routes
for feasibility study and
further development. 
d) Develop designs for
prioritised routes in
anticipation of submitting
applications for funding.
e) As funding becomes
available, construct
prioritised routes.
f) Ongoing continued support
for community group Active
Travel projects. 
Provision of
new/improved active
travel routes that reflect
the needs of
communities, which
have been prioritised
using a clear and
transparent process. 
Increase in the
length of Active
Travel infrastructure
connecting
communities, which
accommodates both
pedestrians and
cyclists. 
Feedback from
members of the
public when
new/improved
infrastructure is
completed. 
a) by 2023
Q2 
b) by 2023
Q3 
c) by 2023
Q4 
d) Ongoing 
e) Ongoing 
Sustainable Travel
Officer 
Moray Access
Manager 
(Traffic Team)
40 Moray Active Travel Strategy 2022 - 2027
1. 
Appendix 3 - Action Plan
Page 66

Page 67

Moray Active Travel Strategy 2022 - 202741
Action and TasksAction
Number
Outcome
Measure
TimescalePlanned Outcome Lead
(supported by)
Develop Active
Travel
Masterplans for
key settlements
in Moray 
Seeks to meet
Objective 1- 
Increase the AT
network with an
extra 5%
infrastructure over
the next 5 years 
a) Identify key settlements
based on population and
current transport network
that would benefit from a co-
ordinated approach to Active
Travel infrastructure
provision, including cycle
parking, based on the 20-
minute neighbourhood
concept.
b) Consult with relevant
communities and
stakeholders to identify
demand for movement and
‘missing’ links in the network.
c) Assess the feasibility of
providing the infrastructure
and determine outline costs.
d) Identify funding sources
and/or community/third
sector groups who can work
to develop and deliver
infrastructure, where
infrastructure proposals do
not meet prioritisation
criteria.
Co-ordinated
approach to the
identification and
delivery of Active
Travel infrastructure
within the key
settlements, based
on the 20-minute
neighbourhood
concept as set out in
National Planning
Framework 4. 
Increase in the
length of Active
Travel infrastructure
within communities,
which
accommodates both
pedestrians and
cyclists. 
Feedback from
members of the
public when
new/improved
infrastructure is
completed. 
a) by 2023
Q2 
b) by 2024
Q3 
c) by 2025
Q1 
d) Ongoing 
e) Ongoing 
Sustainable Travel
Officer 
(Transport
Development and
Traffic Teams,
Strategic Plans and
Development Team) 
2. 
Page 67

Page 68

Action and TasksAction
Number
Outcome
Measure
TimescalePlanned Outcome Lead
(supported by)
Surveys of
residents of new
developments to
determine whether
the physical
infrastructure and
environment
provided has led to
them making more
journeys by Active
Travel instead of by
private vehicles. 
Pedestrian and
cycle counts in new
developments. 
Action and
Tasks are
ongoing. 
Sustainable
Travel Officer 
(Transport
Development and
Traffic Teams,
Strategic Plans
and Development
Team) 
a) Apply Local Development Plan
policies to ensure that
residential streets are
designed to encourage walking
and cycling over the use of the
private car by providing well-
connected, safe and appealing
routes.
b) Ensure that developments that
are adjacent to un-developed
sites make allowance for
future- connections for
pedestrians and cyclists. 
c) Assess the off-site walking and
cycling infrastructure required
to provide reasonable
connection to nearby facilities
such as schools, healthcare,
shopping and leisure, and
where required seek provision
through the use of planning
condition.
d) Request Travel Plans for
developments, which will
attract people to the site, e.g.
employment, hospitals and
schools, and monitor their
implementation. 
Well-connected
developments with
the appropriate level
of walking and cycling
infrastructure
provided which leads
to Active Travel being
the preferred mode
of transport for local,
every day journeys. 
42 Moray Active Travel Strategy 2022 - 2027
3.  Embed Active
Travel
opportunities
within new
developments 
Seeks to meet
Objective 1 -Increase
the AT network with
an extra 5%
infrastructure over
the next 5 years 
Page 68

Page 69

Moray Active Travel Strategy 2022 - 202743
Action and TasksAction
Number
Outcome
Measure
TimescalePlanned
Outcome
Lead
(supported by)
Encourage and
facilitate walking
and cycling as
leisure and
tourist activities
to provide
benefits to
health and the
local economy 
Seeks to meet
Objective 2 -
Increase use of
NCN1* route by
pedestrians and
cyclists by 2% on a
year by year basis
from 2022 to 2027
*National Cycle
Network Route 1 
a) Continue partnership working with local
organisations Outfit Moray, NHS Grampian
and Cycling UK Moray to organise events
and activities to trial electric bikes, pedal
bikes etc. to promote the health benefits of
cycling and walking to residents and visitors
to the area.
b) Develop a community engagement
programme to link with national campaigns
i.e. Walk to Work Week, Cycle to Work Week
and Clean Air Day etc.
c) Continue to work with Sustrans on
improvements to, and promotion of, NCN1.
d) Deliver cycle training and maintenance
sessions to support people to develop
skills, knowledge and confidence.
e) Support Third Parties seeking to provide
simple and affordable bike and eBike hire
stations at key locations in Moray.
f) Arrange and support Active Travel
information events and training for
employers.
g) Work together with Road Safety North East
Scotland to publicise changes to the
Highway Code and driver behaviour as well
as cyclist behaviour.
h) Work together with bus operators to
support and encourage additional Bikes on
Buses services across Moray 
Increased
public
awareness of
health and
wellbeing
benefits of
Active Travel. 
Increased
levels in
cycling
tourism in
Moray. 
Results of Public
Perception
Survey to be
undertaken on a
bi-annual basis. 
Numbers of
participants at
events and
promotional
activities. 
Cycle count data
from NCN1 and
Speyside Way
permanent
count sites. 
2023,Q2 
Ongoing 
Ongoing 
Sustainable Travel
Officer 
(other relevant
council
departments,  NHS
Grampian,   Moray
Speyside Tourism, 
local
Businesses, 
External partners
e.g. Paths for All,
Sustrans and
Cycling UK))
4.
Page 69

Page 70

Action and TasksAction
Number
Outcome
Measure
TimescalePlanned
Outcome
Lead
(supported by)
Provide
new/improved
cycle parking  at
key destinations
and transport
interchanges in
Moray 
Seeks to meet
Objective 3 -Ensure
all major transport
connections and
destinations
(interchanges) and
businesses have
appropriate cycle
parking installed by
2025. 
a) Audit existing cycle parking facilities at
transport interchanges and key
destinations to determine the level and
condition of existing cycle parking and
identify where new/improved parking is
required.
b) Determine locations for additional cycle
parking at transport interchanges/key
destinations, where appropriate in
consultation with the landowner and/or
surrounding businesses.
c) Where appropriate, seek funding for
the provision of additional/improved
cycle parking.
d) Work with transport providers, local
cycling groups and HITRANS to support
solutions for carriage of bikes on public
transport.
e) Ensure all new developments provide
secure cycle parking as set out in the
Moray Local Development Plan.
f) Signpost and promote to Housing
Associations Cycling Scotland’s 'Social
Housing Partnership Fund'. This is for
providers to install a range of
infrastructure including secure cycle
parking, safe spaces to store prams,
buggies, mobility aids seating and
planters etc.
Reduction in the
number of bikes
stolen/vandalised
in public places. 
Increased level of
public confidence
that their cycle
will not be
stolen/vandalised
.
Number of
reports of
stolen/vandalise
d cycles to Police
Scotland where
cycle has been
left in a public
place. 
Results of Public
Perception
Survey to be
undertaken on a
bi-annual basis. 
a) by 2022
Q4 
b) by 2023
Q2 
c) Ongoing 
d) Ongoing 
e) Ongoing 
Sustainable
Travel Officer 
(Traffic Team,
Passenger
Transport Team,
Network Rail,
Stagecoach and
HITRANS) 
44 Moray Active Travel Strategy 2022 - 2027
5. 
Page 70

Page 71

Moray Active Travel Strategy 2022 - 202745
Action and TasksAction
Number
Outcome
Measure
TimescalePlanned Outcome Lead
(supported by)
Work with local
employers
(including Moray
Council) and their
staff to encourage
more walking and
cycling to and
from work. 
Seeks to meet
Objective 4 -
All large employers
(over 250) in Moray
to have a completed
an up to date live
Travel Plan
Document by 2027 
a) Work with local employers to
achieve Cycling Scotland’s
“Cycle Friendly” employer
status.
b) Provide support, guidance and
assistance for employers to
develop or review their Travel
Plan. Cluster organisations and
smaller businesses may be
targeted for joint travel plans.
c) Continue to implement and
publicise the Cycle2Work
scheme to Council employees,
and seek to extend the scheme
through information to other
employers in the area.
d) Promote the use of Council
pool bikes to encourage staff
to undertake shorter work
related journeys by bike.
e) Offer cycle training/ confidence
sessions to Council employees.
f) Encourage a member of Moray
Council Senior Management to
act as an ‘Active Travel
Champion’ to demonstrate
Council commitment to Active
Travel.
Increased confidence
amongst employees
to make some or all
journeys to work by
foot or cycle. 
Increase in the
number of
employees making
some or all of their
journeys to work by
foot or cycle. 
Increased number of
local employers with
a Travel Plan. 
Results of Moray
Council staff surveys. 
Increased number of
cycles being parked
at Council offices. 
Results of surveys of
local employers who
have or are
developing a Travel
Plan to encourage
more walking and
cycling to work. 
Action and
Tasks are
ongoing 
Sustainable
Travel Officer 
(Cycling UK and
Cycling Scotland) 
6. 
Page 71

Page 72

Action and TasksAction
Number
Outcome Measure TimescalePlanned
Outcome
Lead
(supported by)
Work with
students and
school pupils, staff
and parents to
encourage more
walking, cycling
and scooting to
and from
school/further
education 
Seeks to meet
Objective 5 - 95% of
primary schools
delivering Level 2
Bikeability by 2027 
and 
Objective 6 - 60% of
all journeys to school
to be walked or
cycled by 2027 
a) Work with schools and further
education sites to achieve Cycling
Scotland’s ‘Cycle Friendly School and
Campus’ status.
b) Develop a programme to work with
schools to ensure that they have an up
to date School Travel Plan.
c) Continue to deliver and promote
Bikeability Level 2 in primary schools.
d) Continue to promote primary schools
undertaking Sustrans Hands-Up Survey
– which provides an annual count of
mode choice among school pupils.
e) Continue to promote the use of the
Living Streets Travel Tracker programme
in Primary Schools, including those
currently not participating.
f) Continue running educational events
like ‘Parksmart Moray’ to encourage
more pupils to travel actively to school. 
g) Audits of safe routes to school will be
carried out for all Moray schools within
a 3 mile radius.
h Ongoing and improved working
partnership with Education and Social
Care teams, to ensure Active Travel
messaging is being communicated
effectively.
School campuses
that provide
secure cycle
parking for their
pupils and safe
routes within the
school grounds
to access the
parking. 
Increased
confidence
amongst pupils
to make some or
all journeys to
school by Active
Travel. 
Increased
number of pupils
travelling to
school actively. 
Reduced
numbers of
vehicles around
school
entrances. 
Number of schools/
further education
sites with ‘Cycle
Friendly School and
Campus’ status. 
Number of schools/
further education
sites with an up to
date Travel Plan. 
Results of HUSS and
Travel Tracker
programmes. 
Number of cycles
being parked at
education sites. 
Results of traffic
surveys on roads
adjacent to school
entrances. 
Number of customer
contacts regarding
indiscriminate
parking behaviours
at and around
education sites.
a) by 2024
Q4 
b) by 2023
Q4 
c) Ongoing 
d) Ongoing 
e) Ongoing 
f) Ongoing 
Sustainable
Travel Officer 
(Schools and
colleges, Living
Streets, Cycling
Scotland and
Education
Department) 
46 Moray Active Travel Strategy 2022 - 2027
7. 
Page 72

Page 73

Moray Active Travel Strategy 2022 - 202747
Action and TasksAction
Number
Outcome
Measure
TimescalePlanned Outcome Lead
(supported by)
Continue to seek 
funding from
existing sources
and  
Identify new
funding
opportunities as
they emerge to
secure funding for
Active Travel
interventions, as
appropriate. 
Supports the delivery
of all objectives
Provision of
infrastructure and
behaviour change
programmes above
that which can be
secured through
Council revenue and
capital budgets and
ring fenced
Government grants. 
Maximise existing
funding by taking
opportunities to
‘match fund’ where
appropriate thus
securing an increased
level of investment in
the Active Travel
network.
a) Continue to make applications
for funding for pedestrian and
cycling infrastructure and
behaviour change initiatives. 
b) Identify new opportunities for
funding through research and
networking with funding
bodies and fellow
professionals. 
c) Seek to identify new funding
sources for footpath and cycle
path maintenance, particularly
for new routes that are not
adopted, and make
applications for funding as
necessary. 
d) Signposting and promotion of
funding available for ebike
loans and community grants.
E.g. Paths for All, Energy
Savings trust etc.
Level of funding
received through
grant applications
for new/improved
active travel
infrastructure and
behaviour change
programmes.
Action and
Tasks are
on-going
Sustainable Travel
Officer 
(External partners
Funding bodies e.g.
HITRANS, Cycling
Scotland, Paths for
All, Sustrans)
8.
Page 73

Page 74

Page 74

Page 75

Draft Active Travel Strategy and Action Plan Consultation Review Appendix 2 
1
Consultation
The Consultation for the draft Active Travel Strategy (ATS) was led by the Sustainable Travel Officer,
guided by feedback and support through an internal working group, and a key stakeholders group
consisting of individuals, community groups and organisations with an interest in Active Travel. The
consultation took place to ensure the proposed aims and objectives reflect the genuine needs and
desires of existing current and potential Active Travel (AT) users.
Following on from the draft Strategy being approved at Economic, Development and Infrastructure
committee on 7th December 2021, a 12 week consultation period took place between Monday 10th
January 2022 and Sunday 3rd April 2022. Full details of the draft ATS and the consultation
questionnaire were uploaded onto the Moray Council Sustainable Travel webpage. All consultation
events were held virtually through Microsoft Teams, due to Scottish Government Covid 19
guidelines at the time.
Publicity
The draft strategy was publicised through local newspapers, the Moray Council website and social
media, as well as posters erected across walking and cycling routes, transport interchanges and
shared with community councils and committees. A printed version was also made available at
various locations, including Elgin library.
The consultation process took two forms:
i. Two online consultations sessions/ workshops were held with a range of
stakeholders, and
ii. An online survey facilitated through Survey Monkey.
As well as the online survey, there were two online stakeholder consultations held alongside two
online public consultations on the 8th and 28th March 2022. There was a total of 9 in attendance for
the stakeholder sessions, and 7 attended the public sessions. These meetings were made up of
representatives of community councils, community groups, businesses, charities, local authority and
active travel interest groups. Those invited were;
• Moray Local Outdoor Access Forum
• North East Sensory Services
• TSI Moray
• Community Wellbeing Development Team, Moray Council
• Moray Deaf Club
• HITRANS
• Accessible Moray
• ParentAble
• Laich O Moray Active Travel Routes
• All primary and secondary schools
• Outfit Moray
• Living Streets
• Cycling UK
• Buckie LOIP
• Active Schools, Moray Council
• Climate Change, Moray Council
Item 5
Page 75

Page 76

Draft Active Travel Strategy and Action Plan Consultation Review Appendix 2 
2
• Moray Carshare
• NHS Grampian
• Moray Transport Forum
• Forres Green Spaces 
• The Rothes Way
The details of the public sessions were shared through the Council website as well as the Councils
social media and all community councils were invited to attend via email. The public sessions were
also shared by;
• Moray Chamber of Commerce
• UHI Moray
• Elgin BID
• Education, Moray Council
These sessions allowed the public the opportunity to discuss and ask any questions about the draft
ATS.
Engagement Sessions and Workshops
Discussions took place around the differing priorities for different communities within Moray. Some
of those who attended were representing smaller rural villages, so highlighted the need for long
distance routes connecting settlements, whilst others brought up the need to link up existing parts
of the network within our larger towns. The key themes that were raised through the workshop
sessions were:
• Community engagement throughout projects
• Long term maintenance of un-adopted paths
• Dedicated space for cycling and walking (reallocated from existing road space where
appropriate)
• Cycle parking and facilities at destinations
• Road closures around school zones
• Marketing promotion and signing of routes
• Speed limits and traffic calming 
Online Survey Questionnaire
The survey included questions on the proposed vision, aims and objectives and action plan, as well
as additional socio – demographic questions and equality impact. The key questions were: 
• Q1. Do you agree with the proposed vision? If not, what alternative do you propose?
• Q2. Where do you think there are current gaps in walking and cycling infrastructure
provision?
• Q3. What would encourage you to make more trips by foot or by cycle?
• Q4. Do you agree with the overall aims and objectives of the ATS?
• Q5. Do you consider that the proposed actions and tasks will deliver the objectives?
Page 76

Page 77

Draft Active Travel Strategy and Action Plan Consultation Review Appendix 2 
3
• Q6. Are there any impacts of the Strategy which would either be a benefit or
disbenefit to any particular group (e.g. older people, people with a disability,
minority ethnic groups)?
• Q7. Is there anything else you think the Active Travel Strategy and Action Plan
should include to ensure that Active Travel is inclusive for all, and inequalities
addressed?
There were 84 respondents to the online survey questionnaire. There was a spread of ages, with the
55-64 age group forming the largest response rate. There was an equal representation of both males
and females at 45% each, 9% prefer not to say and 1% other. All responses came from within Moray,
with a good mix of locations, although most who responded were from Elgin, Forres or Speyside.
Nearly 97% had access to a car and could drive, and 16% considered their day to day activities to be
impacted by a health problem or disability.
Summary/ Key Findings from Survey
Question 1. Do you agree with the proposed vision? If not, what alternative do you propose?
The majority (80%) of the public and stakeholders were in agreement with the vision of the strategy.
However, some respondent’s highlighted areas that they felt were missing from the vision, such as
the link between the benefits of active travel and reaching net zero as part of climate change
mitigations. A few respondents also felt that the need to improve active travel safety on existing
routes, and the need to include local travel for shopping, were also completely missed from the
vision and strategy. Some respondents commented that they were unsure whether active travel
does ‘support economic development’, and that it should focus more on how it improves physical
wellbeing and climate change. Below are some of the proposed alternative vision statements: 
‘To create a culture and environment where active travel is embedded within communities as the
automatic and obvious choice for short everyday journeys to school, work and leisure’. 
“To create a culture and environment where active travel is the number one choice for short
everyday journeys to school, work and leisure by: providing excellent active travel connections and
accessibility through a safe, integrated, accessible network that supports economic development
and the needs of local communities, and promoting a change in travel behaviour away from the use
of motorised transport”. 
Following on from the consultation however, the Vision Statement was then revised and collectively
developed with consultees from;
‘To create a culture and environment where active travel is the number one choice for short everyday
journeys to school, work and leisure, by providing excellent active travel connections and accessibility
through a safe, integrated, accessible network that supports economic development and the needs of
local communities’ To 
‘To create a culture and environment where active travel is embedded within our communities as the
automatic and obvious choice for everyday journeys to school, work and leisure by: providing a safe,
integrated and accessible network for all.’ 
Page 77

Page 78

Draft Active Travel Strategy and Action Plan Consultation Review Appendix 2 
4
Question 2. Where do you think there are current gaps in walking and cycling infrastructure
provision?
Feedback was received for all eight wards in Moray with respondents providing information on
where they felt there was missing gaps in the current walking and cycling infrastructure. There was
more feedback received for Elgin City North and South, Forres, Speyside and Lossiemouth and
surrounding areas, than the other remaining 3 ward areas. More feedback was received in some
areas over others due to having current active travel community groups such as Forres Green
Spaces, Laich O’ Moray Active Travel Routes and The Rothes Way group. Targeted community
engagement though Local Outcome Improvement Plan meetings, for those areas not as engaged,
could be a way of addressing lack of input from missing wards. There was no particular theme for
Elgin that stood out as respondents highlighted various issues such as; no cycle lanes on nearly all
Elgin roads, access to the town centre from any direction other than North is very difficult, especially
south from the A941 into Elgin. In addition, a lack of safe cycling routes through older parts of the
town from Bishopmill across town to New Elgin, with paths and footways  being frequently blocked
by parked cars and bins, making walking challenging around Bishopmill, particularly for
parents/carers with prams/pushchairs  or people with limitations on their mobility.
In Forres a number of the respondents highlighted a need to have a fully joined up cycle route
between Rafford and Forres. In Speyside, linking Rothes to Elgin along the A941 was deemed to be a
priority, as well Rothes to Craigellachie, which then joins in with the Speyside Way (where the
recently upgraded path already links with some of the smaller settlements in Speyside). In Lossie the
current ongoing community project for a cycle route from Lossiemouth to Hopeman was mentioned
by nearly all respondents for that ward.
Additional comments on the general infrastructure provision across Moray highlighted issues such
as:
• The current cycling network is very fragmented and needs better joined up as there is a lot of
‘bitty’ parts and not enough joined up direct, safe routes. Especially when connecting smaller
settlements into the larger towns such as Elgin and Forres.
• The need for safer and better full links across major A roads A96, A98, A95 etc.
Some further comments and actions from respondents for this question was to:
• Include aspirational and existing route maps into the strategy.
• Name the settlements that will have AT masterplans done.
• Include a priority list of areas where there would be better returns on infrastructure provision. 
Question 3. What would encourage you to make more trips by foot or by cycle? 
The majority of respondents highlighted designated cycle routes and safety as the main priority for
what would encourage them to make more trips by walking and cycling. Cycle parking provision,
maintenance and transport integration (especially in rural areas) was also highlighted a number of
times by respondents as a means to encourage more trips by active travel. A number of the
respondents also noted that distance, weather, and safety was an important factor to consider for
Active Travel in Moray. Below are some of the key observations made by the stakeholders and public
on each of the different themes: 
Page 78

Page 79

Draft Active Travel Strategy and Action Plan Consultation Review Appendix 2 
5
Maintenance
• Gritting of existing paths in winter, as most cyclists choose to use the road if not done. 
• The Garmouth Spey viaduct path was an area of concern for maintenance due to severe tree
root damage on the path.
Safety
• Lowering the speed limit to 20mph in towns and villages.
• Better lighting on existing and new routes.
• Segregated cycle paths from other users.
• Better cycle lanes at junctions.
Cycle Parking
• More cycle parking provision at shops
• Better provision of cycle parking in existing flatted dwelling
• More secure cycle parking in areas of low index of multiple deprivation, and throughout the
larger towns.
• Cycle parking at all bus stops.
Designated Routes/ Cycle Paths
• All comments for cycle paths were similar highlighting common issues, and frequently
mentioned more safe and dedicated cycle/walk routes away from busy main roads.
Although in town areas cycle paths alongside a main road was deemed ok, due to lower
speed of traffic.
Education/ Training
• Educating cyclists to use existing lanes, as it would be pointless creating new infrastructure if
cyclists do not use them.
• Better enforcement of existing cycle lanes i.e. preventing drivers parking on and blocking
them.
• More signage and advertisement of route locations to school
Transport Integration
• Ability to take bikes on buses.
• All buses to have bike holders/carriers, only some currently do.
Additional comments and actions from respondents to encourage more trips by foot or cycle was to
provide toilets and benches along the longer distance routes.
Question 4. Do you agree with the overall aims and objectives of the ATS?
The majority (80%) of the public and stakeholders were in agreement with the overall aims and
objectives of the strategy. The most common query was in relation to objective One, ‘Increase the
AT network with an extra 5% infrastructure over the next 5 years.’ A number of respondents felt that
a 5% target was not ambitious enough over a 5-year period, and recommended this be increased. It
was also suggested that it needs to be made clear what baseline of AT infrastructure we are
currently working from, 5% of what? And what 5% of increased infrastructure will actually provide.
Page 79

Page 80

Draft Active Travel Strategy and Action Plan Consultation Review Appendix 2 
6
Some respondents, primarily from the stakeholders working group, felt that objective Two should be
omitted from the objectives as the NCN1 is more of a challenge/ leisure route and not one that
commuters would use as it is largely on side roads which have 60 mph speed limits and, in some
cases, the perception was that some of these side roads had higher vehicle usage than expected of a
low trafficked road. More focus should be on routes which would support the 20minute
neighbourhood vision promoted through planning policy. 
It was decided upon meeting with the internal Stakeholder group, that objective two would remain
as part of the objectives. The aim of Objective two is to increase the use of the route, not add or
improve infrastructure. The NCN1 runs east to west through Moray and goes through many
locations and provides good data with a large number of counters on it. Many people do use shorter
sections as commuting routes, and more recently Sustrans completed an audit of the NCN1 and
removed sections of the route which they deemed unsuitable to improve the use of it.
Objectives 3, 4, 5 and 6 were largely supported by all, but further information on delivery and
measurement of this would be useful, such as how will we incentivise businesses to develop Travel
Plans.
Additional comments and actions from respondents on the strategy’s aims and objectives were;
• To rewrite the objectives with the current baseline figures included to see the difference in
what we are aiming for
• The three overarching aims to be expanded to four and include everyday life shopping etc.
and the benefits to Health, wellbeing and the economy
• Additionally further clarity and definition of objective three ‘appropriate cycle parking’
should be given.
Question 5. Do you consider that the proposed actions and tasks will deliver the objectives?
Just over half (53%) of respondents felt that the proposed actions and tasks would deliver the
objectives of the strategy. Some respondents highlighted that they felt the Council were under
resourced and underfunded to deliver the project, and only substantial funding would allow the
strategy to move forward successfully. Although there are funding streams available, some do not
believe there is not nearly enough money to undertake all the projects to provide new infrastructure
that the communities may identify.
It was suggested that Moray Council needs to spend 2% of their budget on Active Travel, similar to
what Edinburgh City Council have done with 10% of their overall budget. It was highlighted by some
respondents that the actions and tasks will only deliver the objectives ‘only if it is adequately
funded’. The Action Plan itself has been described as a bit vague, with more detailed SMART targets
needed, as well as a greater delivery plan with a detailed budget and timetable.
Additional comments and actions from respondents on the strategy’s actions and tasks included:
• Adding in tasks around maintenance of existing paths
• Including the identification and integration of the core path network
• Providing support to existing community led ATR projects
• Assessment of landowner support which can then be included in the prioritisation criteria
• Further engagement with Education and social care to ensure schools produce Travel plans and
deliver cycle training
Page 80

Page 81

Draft Active Travel Strategy and Action Plan Consultation Review Appendix 2 
7
• Adding in further measures associated with reducing quantity and speed of traffic such as
20mph speed limits. 
Question 6. Are there any impacts of the Strategy which would either be a benefit or disbenefit to
any particular group (e.g. older people, people with a disability, minority ethnic groups)?
The majority of respondents felt that there would be no impacts of the strategy that would be a
disbenefit to any particular group such as older people or those with a disability. Most respondents
thought that AT could only be of benefit to everyone. The upgraded Speyside Way path was used as
an example of the diverse range of individuals and groups now using it since the works to improve
the surface to make it all weather were completed. Other respondents said that having more active
travel routes can only benefit communities especially those on lower incomes, women, children etc.
However, the need to equally focus on buses within the strategy for those who cannot walk or cycle
due to impairment was also highlighted. 
It was also proposed that any new active infrastructure should be prioritised around areas of
disadvantage, using SIMD data.  Increased electric bike hire facilities and creation of a charging
network, would make cycling more accessible for both older people and people with restricted
mobility.
Question 7. Is there anything else you think the Active Travel Strategy and Action Plan should
include to ensure that Active Travel is inclusive for all, and inequalities addressed?
The majority of respondents felt that there was no additional areas that could be included within the
Strategy and Action Plan, which would ensure it was inclusive for all and inequalities addressed.
However, some suggested actions that had previously been answered within the survey were
reiterated again, such as:
• Bikes on buses, as Active Travel needs to be link up and be supported by public transport.
• Larger cycle racks for trailers and buggies to be parked.
• Reasonably priced bike hire and disability equipment hire
• Seats and toilets strategically placed on routes
• Cycling for disabled people i.e. tandem hire and cycle buddy schemes
• Better maintenance of existing paths for all ability users to use
• Secure cycle storage at ground level for those without a garden (flats etc.) 
Additional information providing the detailed comments and responses received from the online
survey are contained in Annex 1.
Page 81

Page 82

Page 82

Page 83

Draft Active Travel Strategy Survey 2022 – 2027  Appendix 3 
1
Online Survey Monkey Questionnaire 
Q1. Do you agree with the proposed vision? If not, what alternative do you propose?
Q2. Where do you think there are current gaps in walking and cycling infrastructure provision?
Q3. What would encourage you to make more trips by foot or by cycle?
Q4. Do you agree with the overall aims and objectives of the ATS? If not what do you think the aims
and objectives should be?
Q5. Do you consider that the proposed actions and tasks will deliver the objectives? If not what do
you think the aims and objectives should be?
Q6. Are there any impacts of the Strategy which would either be a benefit or disbenefit to any
particular group (e.g. older people, people with a disability, minority ethnic group)?
Q7. Is there anything else you think the Active Travel Strategy and Action Plan should include to
ensure that Active Travel is inclusive for all, and inequalities are addressed?
Q8. What is your postcode?
Q9. What age group do you fall into?
Q10. What gender do you identify as?
Q11. Do you have access to a car/van?
Q12. Can you drive?
Q13. Are your day-to-day activities limited because of a health problem or disability which has
lasted, or is expected to last, at least 12 months (include any problems related to old age? 
Survey Monkey Link - https://www.surveymonkey.co.uk/r/Draft_Active_Travel 
Item 5
Page 83

Page 84

Page 84

Page 85

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 15 NOVEMBER 2022 
SUBJECT: LOCAL FLOOD RISK MANGEMENT PLAN CYCLE 2
FINDHORN, NAIRN AND SPEYSIDE 2022-2028 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of: 
(i) the proposed publication of the Final Report on the Local Flood Risk
Management Plan for Cycle 1; and 
(ii) the proposed publication of the Local Flood Risk Management Plan
Cycle 2. 
1.2 This report is submitted to Committee in terms of Section III (F) (19) of the
Council's Scheme of Administration relating to exercising the functions of the
Council under the Flood Risk Management (Scotland) Act 2009. 
2. RECOMMENDATION 
2.1 it is recommended that Committee: 
(i) agrees the final report on Cycle 1 for the Local Flood Risk
Management Plan (the Plan), for the Findhorn, Nairn and Speyside
(FNS) Local Plan District;
(ii) with the agreement of Highland Council, publish the Final Report;
(iii) agrees the Plan for Cycle 2 for the Findhorn, Nairn and Speyside
Local Plan District; and
(iv) with the agreement of Highland Council, publish the Plan. 
3.  BACKGROUND 
3.1 The Flood Risk Management (Scotland) Act 2009 (the Act) places a duty on
responsible authorities to manage flood risk on a plan-led, risk based,
sustainable way. As part of this process every six years Moray Council, as
Lead Local Authority, must produce and publish a Local Flood Risk
Management Plan for the Findhorn, Nairn and Speyside (FNS) Local Plan
District. This Plan is developed working in partnership with other authorities
including SEPA, Scottish Water, Highland Council, Cairngorm National Park
Authority, Forestry Scotland and Transport Scotland. 
Item 6
Page 85

Page 86

3.2 The Plan includes actions to manage flood risk and identifies when these
actions will be undertaken, who is responsible for them and how they will be
funded.  The actions in the Plan are taken from the National Flood Risk
Management Plan, which is published by SEPA.  Every six years SEPA
undertakes a National Flood Risk Assessment, the findings of which are used
to identify areas at significant risk of flooding.  These areas are known as
Potentially Vulnerable Areas (PVAs) and all actions to mitigate flood risk that
are eligible for grant funding from Scottish Government are within a PVA.  All
PVAs and actions to mitigate flooding within them are included in the National
Flood Risk Management Plan. 
3.3 The Plan for the FNS Local Plan District for Cycle 1 was agreed by this
Committee on 3 May 2016, (paragraph 7 of the minute refers). The Plan was
published in July 2016. The main actions Moray Council was responsible for
implementing in Cycle 1 are provided in the table below. 
Action  PVA Location
Develop Surface Water
Management Plans
Elgin, Forres, Rothes and Aberlour
Maintain Flood Protection
Schemes
Lhanbryde, Forres, Findhorn, Elgin,
Rothes and Aberlour
Flood Protection Studies Spynie (Lossiemouth Seatown) 
3.4 Moray Council is required to report on progress of the Plan twice during the six
year cycle.  An interim report was agreed by this Committee on 4 December
2018, (paragraph 11 of the minute refers).  The main actions included in this
report are provided below. 
• The Lossiemouth Seatown Coastal Protection Flood Study was complete.
• The Surface Water Management Plans (SWMP) for Elgin, Rothes and
Aberlour were complete.
• At this stage it was highlighted that the SWMP for Forres would not be
undertaken in this cycle.  The Integrated Catchment Study would not be
undertaken by Scottish Water as this was no longer considered
appropriate.  However, an enhanced Sewer Model would be produced by
Scottish Water and this would be used to inform a SWMP for Forres, to be
developed in Cycle 2. 
Cycle 1 Final Report
3.5   The Council is required to publish a Final Report on the implementation of the
Plan.  The final report measures performance against the original Plan, which
was published in July 2016. The key outcomes from Cycle 1, delivered by
Moray Council since the Interim Report, which was agreed by members, are:- 
• Continued maintenance of our Flood schemes.
• Updated Planning guidance with regards to Drainage and Flooding.
• Continued maintenance to reduce wider flood risk as set out in the
Schedule of Clearance and Repair which is published on a yearly basis.
• Review of the updated Enhanced Sewer Model for Forres from Scottish
Water. 
These above actions were delivered on time and within the resources
allocated. 
Page 86

Page 87

3.6 The final report highlights that SEPA, due to a cyber-attack, has not been able
to complete a number of its modelling actions. These actions have commenced
and they will continue into Cycle 2. 
3.7 A copy of the Final Report is provided in Appendix 1 
Cycle 2 Local Flood Risk Management Plan
3.8 The Plan for Cycle 2 has been developed in partnership with the other
authorities over the last six years and is provided in Appendix 2. Since the
development of the Plan for Cycle 1 a change has been made to further define
specific areas at risk within a PVA.  These areas are known as Objective
Target Areas (OTAs).  The OTAs for each PVA in Moray are listed in the table
below. 
PVA No PVA Name OTA No OTA Name
02/05/01 Burghead to Lossiemouth 389 Hopeman
391 Lossiemouth
02/05/02 Spynie 9991 Seatown, Lossiemouth
02/05/03 Lhanbryde 390 Lhanbryde
02/05/04 Kingston and Garmouth 463 Kingston
393 Garmouth
02/05/05 Elgin  392 Elgin
02/05/06 Forres 427 Forres
02/05/07 Dallas 421 Dallas
02/05/09 Rothes and Aberlour 397 Rothes
432 Aberlour
02/05/14 Kinloss 420 Kinloss 
3.9 The actions identified for each OTA were agreed by this Committee on 1
December 2020 (Paragraph 20 of the minute refers).  These actions are
provided in the table below. 
OTA Action Type
Hopeman Flood defence maintenance 
Lhanbryde
Lhanbryde
Flood defence maintenance 
Flood study (existing flood defences)
Elgin  Flood defence maintenance 
Flood study (existing flood defences)
Flood scheme or works design
Flood scheme or works implementation
Garmouth Adaptation Plan
Rothes  Flood scheme or works design
Flood scheme or works implementation
Flood defence maintenance 
Flood study (existing flood defences)
Kinloss Flood study
Dallas  Flood study (existing flood defences)
Flood defence maintenance 
Forres  Flood study (existing flood defences)
Surface water management plan
Flood defence maintenance  Page 87

Page 88

Aberlour  Flood study (existing flood defences)
Surface water management plan
Flood defence maintenance 
Kingston Adaptation Plan
Seatown,
Lossiemouth 
Flood scheme or works design
Flood scheme or works implementation 
3.10 Following the agreement of the actions a joint consultation was undertaken by
SEPA and Moray Council on both The Plan and the National Flood Risk
Management Plan. Due to the cyber-attack which SEPA suffered in December
2020, this consultation was delayed by 6 months taking place on 31 July 2021
and closing on 31 October 2021. Members agreed Moray Council’s response
to the consultation at Economic Growth, Housing and Environmental
Sustainability Committee on 24 August 2021 (paragraph 10 of the minute
refers). Following the closure of the consultation 18 responses were received
for the FNS Local Plan District, of which 13 were associated with the Moray
Council area. For further detail of the consultation responses refer Section
1.3.4 of Appendix 2. 
3.11 The National Flood Risk Management Plan for Cycle 2 was published by SEPA
in December 2021.  The Plan for the FNS Local Plan District has been drafted
in line with the National Plan and in consultation with our partner organisations. 
The Plan has a total of 68 actions across 19 OTAs and 48 of these actions are
within 12 OTAs in the Moray area. 
3.12 The majority of actions will be undertaken by the Council’s Flood Team using
the existing revenue allocation.  However, subject to the observations at 3.14
below, projects that require significant spend, such as the development and
construction of a flood protection scheme, will be subject to 80% grant funding
from Scottish Government.  How actions will be funded is set out in Appendix
2. 
3.13 The current Flood Risk Management revenue budget and staffing levels are
sufficient to undertake the actions not subject to grant funding from Scottish
Government, identified in the Plan for the next six years. 
3.14 Works that are subject to grant funding from Scottish Government have been
included in the Plan.  However, there is a significant gap in Flood Risk
Management funding due to increased costs of works committed to in Cycle 1. 
It is currently unclear how much funding will be available for works in Cycle 2. 
Prioritisation of works will not be undertaken until issues relating to the funding
gap have been resolved between COSLA and Scottish Government.  The
works that are subject to grant funding in Cycle 2 are provided in the table
below.   
Elgin: Surface Water Management Schemes
Rothes: Surface Water Management Schemes
Buckie and Portessie: Portessie Coastal Flood Defence Scheme 
Buckie and Portessie: Buckie Surface Water Management Flood Scheme 
Seatown, Lossiemouth: Coastal Flood Defence Scheme 
3.15 The Plan has been agreed by Scottish Water and SEPA and will be the subject
of a report to Highland Council for agreement on 10 November 2022. Page 88

Page 89

4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Flood Risk Management is a key priority in the 10 year plan “Building a
better future for our children and young people in Moray.” 
(b) Policy and Legal
Under the Flood Risk Management (Scotland) Act 2009, the Council has
a statutory duty to implement the Actions from the Local Flood Risk
Management Plans. The Council can do works not included in the Plans
that will manage flood risk, provided it does not affect the delivery of
those Actions in the Plans. 
(c) Financial implications
The proposed plan has financial implications on our capital spend if the
schemes are prioritised and funded by Scottish Government. The 10
year Capital Plan currently has an allowance for these schemes from
2026 to 2028. 
(d) Risk Implications
There are no risks associated with the recommendations in this report. 
(e) Staffing Implications
The proposed Plan can be delivered from within the current resources
within the Flood Risk Management Team. 
(f) Property
The Plan currently does not have any implications on the Council’s
property portfolio. However, it should be noted that if the proposed
schemes are progressed this position may change, as any new scheme
would become the property of Moray Council. Progression of proposed
schemes would be the subject of a separate report to a future meeting of
this committee. 
(g) Equalities/Socio Economic Impact
There are no equalities implications arising from this report. 
(h) Climate Change and Biodiversity Impacts
The Plan has significant impacts on our aims to manage the challenges
of climate change. The action to produce Adaptation Plans will allow
Moray Council to better use resources in the future to manage flooding.
The Plan also has particular reference to planning policy which will be
used to help ensure that development and design in such a way to
manage the risk of flooding from climate change. 
(i) Consultations
Depute Chief Executive (Economy Environment & Finance), Head of
Environmental and Commercial Services, Chief Financial Officer, Legal
Services Manager, Equalities Officer and Lissa Rowan, Committee
Services Officer have been consulted and their comments incorporated
into the report. 
Page 89

Page 90

5. CONCLUSION 
5.1 The majority of the actions identified in the Plan for Cycle 1 are complete
and details are provided in the Final Report. 
5.2 Actions identified for Cycle 2 in the National Flood Risk Management
Plan must be included in the Plan. The Plan provides details of when the
actions will be undertaken, how they will be funded (noting the current
funding issues to be resolved), who is responsible for implementing
them and how they will be coordinated and monitored. 
5.3 Moray Council has a Statutory Duty to publish the Plan for Cycle 2 on or
before 22 December 2022. 
Author of Report:  Will Burnish Senior Engineer Flood Risk Management 
Background Papers: 
Ref: SPMAN-524642768-800 
Page 90

Page 91

ap 
Published by Moray Council August 2022
Local Flood Risk
Management Plan
FINDHORN, NAIRN AND SPEYSIDE
Final Report
Item 6
Page 91

Page 92

ap 
Page ii 
Contents
1 Foreword ......................................................................................................................................... 4
2 Background ..................................................................................................................................... 5
3 Review of the plan .......................................................................................................................... 5
3.1 Progress Highlights .................................................................................................................. 5
3.2 Significant Deviations from the Plan ....................................................................................... 6
3.3 Significant Challenges ............................................................................................................. 6
3.3.1 Significant weather events .............................................................................................. 6
3.3.2 COVID-19 Pandemic ........................................................................................................ 6
3.3.3 Resources ........................................................................................................................ 7
3.3.4 Technical Complexity ....................................................................................................... 7
3.4 The Next Planning Cycle .......................................................................................................... 7
3.5 Conclusions ............................................................................................................................. 8
4 Assessment of Progress .................................................................................................................. 9
5 Progress with LPD-wide Actions ................................................................................................... 11
5.1 Actions applicable across the Local Plan District .................................................................. 11
5.2 Progress of LDP-wide actions ................................................................................................ 12
5.2.1 Summary of progress of PVA-wide actions to manage flood risk ................................. 12
6 Progress with PVA-specific Actions ............................................................................................... 16
6.1 Findhorn, Nairn and Speyside Plan District (PVA 05/01) ...................................................... 17
6.2 Findhorn, Nairn and Speyside Plan District (PVA 05/02) ...................................................... 20
6.3 Findhorn, Nairn and Speyside Plan District (PVA 05/03) ...................................................... 22
6.4 Findhorn, Nairn and Speyside Plan District (PVA 05/04) ...................................................... 24
6.5 Findhorn, Nairn and Speyside Plan District (PVA 05/05) ...................................................... 27
6.6 Findhorn, Nairn and Speyside Plan District (PVA 05/06) ...................................................... 30
6.7 Findhorn, Nairn and Speyside Plan District (PVA 05/07) ...................................................... 33
6.8 Findhorn, Nairn and Speyside Plan District (PVA 05/08) ...................................................... 35
6.9 6.9 Findhorn, Nairn and Speyside Plan District (PVA 05/09) ................................................ 37
Page 92

Page 93

ap 
Page iii 
6.10 Findhorn, Nairn and Speyside Plan District (PVA 05/10) ...................................................... 40
6.11 Findhorn, Nairn and Speyside Plan District (PVA 05/11) ...................................................... 42
6.12 Findhorn, Nairn and Speyside Plan District (PVA 05/12) ...................................................... 44
6.13 Findhorn, Nairn and Speyside Plan District (PVA 05/13) ...................................................... 47
6.14 Findhorn, Nairn and Speyside Plan District (PVA 05/14) ...................................................... 50
Annex 1: Actions ................................................................................................................................... 52
Annex 2: Roles and Responsibilities ...................................................................................................... 53
Annex 3: Links to other plans, policies, strategies and legislative requirements ................................. 56
Annex 4: Supporting information ......................................................................................................... 57
Annex 5: Acknowledgments ................................................................................................................. 63
Glossary ................................................................................................................................................. 65 
Page 93

Page 94

ap 
Page iv 
1 Foreword
This Final Report for the Local Flood Risk Management Plan shows the progress made in delivering
the actions to avoid and reduce the risk of flooding, to allow us to prepare and protect ourselves and
our communities across the breadth of the local plan district (LPD). The report also marks the
completion of Cycle 1 as we now transition into Cycle 2. 
“The impacts of flooding experienced by individuals, communities and businesses can be devastating
and long lasting. It is vital that we continue to reduce the risk of any such future events and improve
Scotland’s ability to manage and recover from any events which do occur.”
(Findhorn, Nairn and Speyside Local Flood Risk Management Plan, June 2016) 
The publication of this Final Report shows that the coordinated and collaborative efforts of public
bodies can be brought together to deliver sustainable outcomes. 
The Interim Report for the Findhorn, Nairn and Speyside LPD is published by Moray Council on
behalf of a partnership comprising two local authorities: Moray Council and The Highland Council; as
well as Scottish Water; SEPA; Cairngorms National Park Authority and Forestry Commission Scotland. 
Individuals are the first line of defense against flooding and have responsibilities to protect
themselves from flooding.  Through self-help and property level protection, awareness raising and
signing up to Floodline (www.floodlinescotland.org.uk), individuals, businesses and communities can
and have made key contributions to the delivery of the actions in the LFRMP (the ‘Plan’). 
Since the publication of the Plan in June 2016, public sector finances in Scotland have continued to
be under considerable pressure. This places an even greater responsibility on SEPA, local authorities
and Scottish Water and other responsible authorities to deliver their flood risk management
responsibilities and, in particular the actions in the Plan, to manage flooding in a sustainable way. 
SEPA, local authorities, Scottish Water, and other responsible authorities will continue to work
collaboratively to implement the actions set out in the 2nd planning cycle to June 2028. 
Page 94

Page 95

ap 
Page 5 
2 Background
The Final Report is a statutory requirement of the Flood Risk Management (Scotland) Act 2009
(Section 38).  The Final Report presents:
• an assessment of the progress made towards implementing the Findhorn, Nairn and
Speyside Local Flood Risk Management Plan (the ‘Plan’);
• a summary of the planned actions which were not implemented, with reasons for their non-
implementation; and
• a description of any other actions implemented since the plan was finalised which the lead
authority considers have contributed to the achievement of the objectives.
Further details on flood risk management responsibilities in Scotland and the legal requirement for
the publication of this Interim Report can be found in Appendix 1.
A copy of the Findhorn, Nairn and Speyside Cycle 1 Local Flood Risk Management Plan can be found
at Moray Council FRM 
3 Review of the plan
This section presents the review of the Plan including progress highlights, a statement on the
planned actions not implemented, the significant challenges faced and the next steps to be taken
forward during the 2nd planning cycle.
3.1 Progress Highlights
A selection of progress highlights since publication of the Plan in June 2016 are noted below to give a
flavour of the work being undertaken across the Findhorn, Nairn and Speyside Local Plan District to
reduce flood risk.  A summary of progress against every action in the Plan is presented in Sections 4
and 5. 
• PVA 05/01 Burghead to Lossiemouth – SEPA have continued to maintain and operate the
Findhorn to Lossiemouth flood warning service  
• PVA 05/02 Spynie – Scottish water have completed of the Lossiemouth sewer catchment 
• PVA 05/03 Lhanbryde – Moray Council have continued to maintain the flood prevention
scheme
• PVA 05/04 Spey Bay – SEPA have developed hazard mapping to improve the understanding
of coastal flooding
• PVA 05/05 Elgin – Moray Council have prepared a Surface Water Management Plan for the
Elgin area
• PVA 05/06 Forres – SEPA have continued to maintain and operate the Forres flood warning
service from the River Findhorn 
Page 95

Page 96

ap 
Page 6 
• PVA 05/08 Nairn East and Auldearn – Strategic mapping and modelling has been carried out
by Scottish Water for high risk sewer catchment areas 
• PVA 05/09 Rothes and Aberlour – The Moray Council have continued to carry out
maintenance of the flood protection schemes and the local waterways to reduce the overall
flood risk
• PVA 05/10 Carrbridge – The Highland Council have continued to carry out maintenance the
local waterways to reduce the overall flood risk
• PVA 05/11 Aviemore & Boat of Garten – SEPA continuing to provide flood forecasting and
flood warnings to the local area
• PVA 05/12 Kingussie – The Highland Council completed a flood protection study to help
reduce the risk of flooding from the Gynack Burn 
• PVA 05/13 Newtonmore – The Highland Council have continued to carry out maintenance
the local waterways to reduce the overall flood risk
• PVA 05/14 Dalwhinnie - SEPA continuing to provide flood forecasting to the local area to
help local prepare for a potential flood   
3.2 Significant Deviations from the Plan
The status of the planned actions is summarised in Section 3 and detailed in Sections 4 and 5.
3.3 Significant Challenges
Based on a review of the assessment of the progress of actions detailed in this Interim Report, the
following key challenges and issues have been identified, some of which have had an impact on the
delivery of actions to manage flood risk.  Where these challenges have had an impact on the delivery
of specific actions, this impact is detailed in Sections 4 and 5.
3.3.1 Significant weather events
Whilst occasional flooding has occurred within the Findhorn, Nairn & Speyside LPD over recent
years, the area has generally not experienced the exceptional flooding witnessed in other parts of
Scotland e.g. Ballater and the Scottish Borders.  Storms in 2016 and 2017 period, brought some
flooding to the area, but the heaviest rainfall associated with these storm systems fell to the around
Rothes and coastal flooding occurred along the Moray coast within the Findhorn, Nairn and Speyside
Local Plan District.  More recently, intense summer rainfall scotland July 2021 brought localised
flooding to a number of areas, including Forres.  When flooding does occur, resources are directed
away from strategic planning to respond to the incident.
3.3.2 COVID-19 Pandemic
The COVID pandemic has impacted the delivery of the Plan actions including a requirement to
suspend flood risk management construction works as part of the national effort to minimise the
spread of the virus during the first national lockdown.  The pandemic also disrupted flood risk
Page 96

Page 97

ap 
Page 7 
management studies due to the transition to home working and the challenges of effectively
consulting flood vulnerable communities.  These impacts have resulted in higher implementation
costs and programme delays.
3.3.3 Resources
Whilst the majority of actions have either been progressed in line or have advanced further than set
out in the Plan, the primary reason for actions not progressing as far as intended was a challenging
resource environment.  A range of resources were required to progress the actions set out in the
Plan to reduce flood risk.  These include the authorities responsible for progressing individual actions
being able to allocate sufficient funding for that purpose.
The available human resource, with the necessary skills to manage and develop solutions to reduce
flood risk, has also constrained progress.  Much of this human resource pressure has arisen from the
increased level of investment in flood risk management across Scotland and the wider UK, leading to
challenging recruitment.  This pressure is compounded by flood risk management demanding
particular technical skills.  This human resource pressure has been observed within the authorities
responsible for progressing individual actions and the engineering consultants that these authorities
seek to engage to support the development of solutions.
3.3.4 Technical Complexity
Developing an understanding of how flooding occurs and the most appropriate combination of
solutions to reduce flood risk is technically challenging, including the need to build complex
computer models to understand how storm events, tides, watercourse geometry, topography, land
use and climate change all interact to cause flooding.  This challenge has impacted progress on a
number of actions which has delayed progress on subsequent actions.  More appropriate technical
solutions have also been identified for a number of actions, compared to the way forward envisaged
when the Plan was prepared but these enhanced solutions, particularly in relation to strategic
mapping and modelling, have taken longer to implement.
3.4 The Next Planning Cycle 
This report marks the completion of Cycle 1 and we are now transitioning into Cycle 2.  The Flood
Risk Management Plan for Cycle 2 can be accessed via the following link:
[Insert Link]
The Cycle 2 Local Flood Risk Management Plan is scheduled to be published during December 2022.
Page 97

Page 98

ap 
Page 8 
Many of the Cycle 1 actions were to undertake studies that have led to the identification of further
actions to be implemented in Cycle 2 and beyond.  For example, a flood protection study may
recommend that a community flood action group is set up to increase resilience to flooding, or that
a flood defences are constructed.
3.5 Conclusions
Overall, through partnership working, by delivering the actions set out in the Findhorn, Nairn and
Speyside LFRMP we have reduced flood risk and helped to inform future actions to further reduce
flood risk that will be progressed during Cycle 2 and subsequent cycles.  Whilst the majority of
actions have either been progressed in line or have advanced further than set out in the Plan, a small
number of actions have not progressed as far as intended, primarily due to a lack of resources. 
Other actions have been delayed where they have been dependent on the results from earlier
studies.  Some actions have also been superseded by a change in approach that will deliver better
outputs but at a later date. 
Page 98

Page 99

ap 
Page 9 
4 Assessment of Progress
This section sets out an assessment of the progress towards implementing the actions set out in the
Plan.  There are actions that apply across the whole of the Findhorn, Nairn & Speyside LPD and
actions that are specific to each of the 14 Potentially Vulnerable Areas (as defined under Section 13
of the Act) in the Findhorn, Nairn & Speyside LPD, which are shown below in Figure 1. 
Figure 1: The Findhorn, Nairn and Speyside LPD with Potentially Vulnerable Areas identified
Details of Potentially Vulnerable Areas taken from Findhorn, Nairn and Speyside Flood Risk Management Strategy, SEPA
(December 2015) 
A progress summary of the actions set out in the Plan is shown overleaf in Figure 2.  Progress is
shown using a traffic light system based on data collected during February 2022, where each item is
marked as Red, Amber or Green (RAG) to describe the status of the action as follows:
Green – Action has been completed.
Amber – Action has commenced but has not progressed as far as envisaged in the Plan.
Red – Action has not commenced.
O – Ongoing 
The distribution of actions by Potentially Vulnerable Area is shown in Table 1. Further detail on
specific actions can be found in the relevant Potentially Vulnerable Area section within Chapter 5.
Page 99

Page 100

ap 
Page 10 
Table 1: Range of Objectives and Actions identified for each Potentially Vulnerable Area
PVA
Flood Protection Scheme W
orks
Natural Flood Management W
orks
New
Flood W
arning
Flood Protection Study
Natural Flood Management Study
Surface W
ater Plan/Study
Strategic Mapping and Modelling
SEPA
Coastal
Strategic Mapping and Modelling SEPA
Pluvial/Fluvial
Strategic Mapping and Modelling
Scottish W
ater
Maintain Flood Protection Scheme
Maintain Flood
W
arning
Flood Forecasting
Property Level Protection Scheme
Community Flood Action Group
Self Help
Awareness Raising
Maintenance
Site Protection Plan
Emergency Response Plans
Planning Policy
05/01 Burghead to Lossiemouth           O O   O O O  O O
05/02 Spynie           O O   O O O  O O
05/03 Lhanbryde          O  O   O O O  O O
05/04 Spey Bay           O O  O O O O  O O
05/05 Elgin          O O O   O O O  O O
05/06 Forres          O O O   O O O  O O
05/07 Findhorm          O O O   O O O  O O
05/08 Nairn East & Auldearn           O O   O O O  O O
05/09 Rothes & Aberlour          O O O   O O O  O O
05/10 Carrbridge            O O   O O O  O O
05/11 Aviemore & Boat of Garten           O O   O O O  O O
05/12 Kingussie           O O   O O O  O O
05/13 Newtonmore           O O  O O O O  O O
05/14 Dalwhinnie            O   O O O  O O
Page 100

Page 101

ap 
Page 11 
5 Progress with LPD-wide Actions
5.1 Actions applicable across the Local Plan District
Some flood risk management objectives and actions apply to all areas, whether designated
as a Potentially Vulnerable Area or not.  For example, flood risk can be managed through
national planning policy or as part of ongoing statutory duties discharged by local
authorities. 
The Local Plan District-wide objectives and the corresponding actions are set out in the
following tables by lead authority.  No additional LPD wide actions have been implemented. 
List of councils and authorities:
MC – Moray Council 
HC – Highland Council 
NR – Network Rail
SEPA – Scottish Environment Protection Agency
SW – Scottish Water
TS – Transport Scotland 
Page 101

Page 102

ap 
Page 12         
5.2 Progress of LDP-wide actions
5.2.1 Summary of progress of PVA-wide actions to manage flood risk
Summary of progress of PVA-wide actions to manage flood risk for Findhorn, Nairn and Speyside
Action Status PVA Description Start End Progress Future actions
Flood
Forecasting  G
05/01
to
05/14 
The Scottish Flood Forecasting Service is a joint
initiative between SEPA and the Met Office that
produces daily, national flood guidance
statements which are issued to Category 1 and 2
Responders.
2015 2022
SEPA has continued to operate the Scottish
Flood Forecasting Service (SFFS) Partnership
with the Met Office with daily, national Flood
Guidance Statements issued to Category 1
and 2 agencies (such as emergency
responders, local authorities and other
organisations with flooding management
duties) and regional Flood Alerts issued to the
public. Each daily statement gives an
assessment of the risk of flooding for the next
five days to enable these organisations to put
preparations in place to reduce the impact of
flooding. SEPA’s Flood Alert service is freely
available to everyone and enables
communities to be aware and prepared to
reduce the impacts of flooding.
SEPA will continue and
improve the Scottish Flood
Forecasting Service (SFFS)
with the Met Office, with daily
Flood Guidance Statements
and regional Flood Alerts
issued as required to enable
communities and responders
to reduce the impacts of
flooding. SEPA is currently
exploring options to develop a
public version of the daily
Flood Guidance Statement to
provide better and earlier
information to the public.
Self Help G
05/01
to
05/14
Everyone is responsible for protecting
themselves and their property from flooding. 
Local authorities, SEPA, Scottish water and other
organisations support communities by providing
advice and help in coordinating resilience
measures.
2015 2022
The Highland Council work with Scottish
Flood Forum to recommend areas which
might benefit from independent Property
Level Protection surveys and
recommendations. 
To date no requests for support have been
received by communities in the Findhorn,
Nairn and Speyside LPD.
Local authorities, SEPA,
Scottish water and other
organisations will provide
support to communities on
request.
Page 102

Page 103

ap 
Page 13         
Awareness
Raising  G
05/01
to
05/14
SEPA and the responsible authorities have a duty
to raise public awareness of flood risk. Improved
awareness of flood risk and actions that prepare
individuals, homes and businesses.
2015 2022
SEPA has delivered a range of awareness
raising activities through campaigning,
education activities and partnership delivery.
SEPA has run national and local digital and
direct engagement campaigns to raise
awareness of flood risk and SEPA’s flood
warning service, Floodline. SEPA publish and
publicise an electronic newsletter (Flooding
Gateway) four times a year which is
distributed to a wide audience. SEPA is
working with Education Scotland and Scottish
Government Resilience team to embed
flooding awareness within the Curriculum for
Excellence, and resilience partners in Safer
Communities programmes. SEPA has also
developed an online tool that helps everyone
share information on current flooding issues
(Report-a-Flood). We have worked in
partnership with local authorities, emergency
services and community organisations (e.g.
Neighbourhood Watch Scotland, Citizens
Advice Scotland and others) to share our
resources and help to promote preparedness
and understanding of how we manage flood
risk in Scotland. SEPA has actively supported
the Scottish Flood Forum and worked closely
with UK agencies to develop joint flooding
information. 
The Highland Council, working with SFF and
SEPA have begun developing a strategy for
encouraging community resilience across the
Highlands. The Highland Council continues to
engage local members, community councils,
schools and the public where Flood
Protection Studies and Schemes are being
carried out and aims to coordinate these
events with SEPA and SFF. 
Moray Council has undertaken a number of
visits to local schools to raise awareness and
SEPA will continue to raise
awareness of flood risk
through campaigning,
developing education and
engagement tools, creating
new partnerships and
improving the flood warning
and forecasting service.  Many
of our awareness raising
activities currently underway
will continue.  Our focus will
be on promoting flood
warning and forecasting
service, innovation, education
and engagement with
partners and customers and
the public. 
The Highland Council is
working towards a strategy to
address flood resilience in
relevant communities. 
Moray Council will continue
its programme of school visits
and will hold public
information events as and
when required.
Page 103

Page 104

ap 
Page 14         
Summary of progress of PVA-wide actions to manage flood risk for Findhorn, Nairn and Speyside
Action Status PVA Description Start End Progress Future actions
has held public exhibitions where
studies/works are planned.
Maintenance  G
05/01
to
05/14
Local authorities have a duty to assess
watercourses and carry out clearance and repair
works where such works would substantially
reduce flood risk. 
Scottish Water undertakes risk-based
inspections, maintenance and repair on the
public sewer network.
2015 2022
The Highland Council inspects watercourses
within its region according to an inspection
regime which also includes formal flood
defences. The Highland Council’s Schedule of
clearance and repair works are published
online at:
https://www.highland.gov.uk/info/1226/eme
rgencies/81/flooding/5 
Moray Council inspects waterbodies and
flood protection schemes within its region
according to a risk based inspection regime
and maintenance works are undertaken
where required.  Moray Council’s schedule of
Clearance and Repair Work is published
online at www.moray.gov.uk/flooding. 
Scottish Water’s risk based inspections are in
progress.
The Highland Council will
continue with its inspection
regime and publish its
Schedule of Clearance and
Repair Work. 
Moray Council will continue
with its inspection regime and
publish its Schedule of
Clearance and Repair Work. 
Scottish Water will continue
to undertake risk based
inspection and repair of the
public sewer system.
Emergency
Plans/
Response 
G
05/01
to
05/14
Providing an emergency response to flooding is
the responsibility of many organisations,
including local authorities, the emergency
services and SEPA.
2015 2022
The Highland Council Emergency Planners
have in place and maintain Emergency Plans
for all contingencies. The Highland Council is
a member of the Highlands & Islands Local
Resilience Partnership (HILRP). 
Moray Council’s Emergency Planner has in
place and maintains an Emergency Plan for all
contingencies.
No further action planned. 
Page 104

Page 105

ap 
Page 15         
Summary of progress of PVA-wide actions to manage flood risk for Findhorn, Nairn and Speyside
Action Status PVA Description Start End Progress Future actions
Planning
Policy  G
05/01
to
05/14
Scottish Planning Policy and accompanying
Planning Advice Notes set out Scottish Ministers’
priorities for the operation of the planning
system and for the development and use of land
in terms of flood risk management.
2015 2022
The Highland Council, as a planning authority,
considers flood risk and drainage impact to be
a material consideration for any new planning
application. When a new planning application
is submitted to The Highland Council it must
satisfy local adopted supplementary guidance
on Flood Risk and Drainage Impact
Assessment. 
Moray Council, as Planning Authority ensure
that any new developments satisfy relevant
guidance and policies on flooding and
drainage.
The Highland Council and
Moray Council to continue
with to ensure any new
developments satisfy relevant
guidance on flooding and
drainage. 
Page 105

Page 106

ap 
Page 16 
6 Progress with PVA-specific Actions
This chapter is focused on the actions being taken to manage flood risk in the Potentially
Vulnerable Areas. For each Potentially Vulnerable Area, background information including a
summary of flood impacts and the actions to manage flooding is presented. Additional
information on flooding within each Potentially Vulnerable Area is available within the
Findhorn, Nairn and Speyside Flood Risk Management Strategy, available on the SEPA
website here - http://apps.sepa.org.uk/FRMStrategies/
The background information sets the scene for the planned actions to manage flooding that
have been prioritised for delivery between 2016 and 2022. The Potentially Vulnerable Area
level action tables set out the flood management objective that is to be achieved, provide a
description of the action, identify who will be responsible for the delivery and
implementation and a timetable of when the actions will be undertaken. The Local Plan
District wide actions noted in Section 4 apply to all Potentially Vulnerable Areas.
This information is provided for each of the 14 Potentially Vulnerable Areas Findhorn, Nairn
and Speyside Local Plan District. Each Potentially Vulnerable Area has a separate sub-section
with each sub-section following the same format.
The flood management objectives are the shared aims for managing flooding. Actions
describe where and how flood risk will be managed. Objectives and actions have been set by
SEPA and agreed by the flood risk management responsible authorities following
consultation.
Many organisations, such as Scottish Water and energy companies, actively maintain and
manage their own assets including the risk from flooding. Where known, these actions are
described here. NatureScot and Historic Environment Scotland work with site owners to
manage flooding where appropriate at designated environmental and/or cultural heritage
sites. These actions are not detailed further in the Local Flood Risk Management Plan. 
Page 106

Page 107

ap 
Page 17         
6.1 Findhorn, Nairn and Speyside Plan District (PVA 05/01)
Local Plan District Local authority Main catchment
Findhorn, Nairn and Speyside The Moray Council Moray coastal
Summary of Progress for Burghead to Lossiemouth (PVA 05/01) 
The area has a risk of surface water, coastal and
river flooding. The majority of damages are
caused by surface water flooding. There are
approximately 30 residential properties and 40
non-residential properties at risk of flooding. The
Annual Average Damages are approximately £120,
000. Further information can be found in the
LFRMP under PVA 05/01.
Link to LFRMP PVA 05/01
Key progress:
• Strategic mapping and modelling –
Coastal, SEPA have been updated the
coastal flood maps 
• Existing flood warnings are being
maintained 
Annual Average Damages by flood source
Overview of actions to manage flooding in PVA 05/01
PVA Flood Protection Scheme
W
orks
Natural Flood
Management W
orks
New
Flood W
arning
Flood Protection Study
Natural Flood
Management Study
Surface W
ater Plan/Study
Strategic Mapping and
Modelling SEPA
Coastal
Strategic Mapping and
Modelling SEPA
Pluvial/Fluvial
Strategic Mapping and
Modelling Scottish W
ater
Maintain Flood Protection
Scheme
Maintain Flood W
arning
Flood Forecasting
Property Level Protection
Scheme
Community Flood Action
Group
Self Help
Awareness Raising
Maintenance
Site Protection Plan
Emergency Response
Plan
Planning Policy
Page 107

Page 108

ap 
Page 18         
05/01                     
Summary of progress of actions to manage flood risk in PVA 05/01
Action Status
(Red;
Amber;
Green)
Description Delivery
Lead
Planned
Dates
Progress in Delivery, including key
deliverables and dates
Revised dates and planned actions to
complete / address delay
Strategic mapping
and modelling -
Coastal
A SEPA plan to develop the flood hazard
mapping in the Banff to Lossiemouth area
to improve understanding of coastal flood
risk.
SEPA 2017 Following the establishment of a
coastal flood hazard map,
development framework and
characterisation of the coastline,
several projects are currently
underway at this location: 
• Development of a national coastal
joint probability dataset; 
• Update to the UK design extreme
sea level dataset; 
• Coastal modelling and mapping
project for north-east Scotland. 
These projects will collectively enable
the revision of flood mapping for the
coastline from Scrabster to Arbroath
including the Orkney Islands. 
It is planned to complete this action in
2023. 
Strategic mapping
and modelling
G Scottish Water are undertaking
investigation and modelling in the
Lossiemouth sewer catchment to improve
Scottish
Water
2019 On track to deliver within agreed
LFRMP timescales 
Page 108

Page 109

ap 
Page 19         
knowledge and understanding of flood
risk in this area. 
Maintain flood
warning
G Continue to maintain the Findhorn to
Lossiemouth flood warning area which is
part of the Moray Firth Flood Warning
scheme.
SEPA Ongoing SEPA has continued to operate the
flood warning service 
SEPA will continue to operate the
flood warning service 
Page 109

Page 110

ap 
Page 20         
6.2 Findhorn, Nairn and Speyside Plan District (PVA 05/02)
Local Plan District Local authority Main catchment
Findhorn, Nairn and Speyside The Moray Council Moray coastal
Summary of Progress for Spynie (PVA 05/02) 
The area has a risk of coastal, surface water, river
flooding. The majority of damages are caused by
coastal flooding. There are approximately 80
residential properties and 10 non-residential
properties at risk of flooding. The Annual Average
Damages are approximately £260, 000. Further
information can be found in the LFRMP under PVA
05/02.
Link to LFRMP PVA 05/02
Key progress:
• Strategic mapping and modelling –
Coastal, SEPA have been updated the
coastal flood maps 
• Maintenance to existing waterways has
been carried out by Moray Council 
Annual Average Damages by flood source
Overview of actions to manage flooding in PVA 05/02
PVA Flood Protection Scheme
W
orks
Natural Flood
Management W
orks
New
Flood W
arning
Flood Protection Study
Natural Flood
Management Study
Surface W
ater Plan/Study
Strategic Mapping and
Modelling SEPA
Coastal
Strategic Mapping and
Modelling SEPA
Pluvial/Fluvial
Strategic Mapping and
Modelling Scottish W
ater
Maintain Flood Protection
Scheme
Maintain Flood W
arning
Flood Forecasting
Property Level Protection
Scheme
Community Flood Action
Group
Self Help
Awareness Raising
Maintenance
Site Protection Plan
Emergency Response
Plan
Planning Policy
05/02                    
Page 110

Page 111

ap 
Page 21         
Summary of progress of actions to manage flood risk in PVA 05/02
Action Status
(Red;
Amber;
Green)
Description Delivery
Lead
Planned
Dates
Progress in Delivery, including key
deliverables and dates
Revised dates and planned
actions to complete / address
delay
Flood
Protection
Study
G A flood protection study is underway to
consider a coastal flood protection scheme
for Seatown in Lossiemouth.
Moray
Council
2019 The feasibility section of this study is now
complete and the option development is on
track for completion in 2019.
Complete
Strategic
mapping and
modelling -
Coastal
A SEPA plan to develop the flood hazard
mapping in the Banff to Lossiemouth area to
improve understanding of coastal flood risk.
SEPA 2017 Following the establishment of a coastal
flood hazard map development framework
and characterisation of the coastline,
several projects are currently underway at
this location: 
• Development of a national coastal joint
probability dataset; 
• Update to the UK design extreme sea level
dataset; 
• Coastal modelling and mapping project for
north-east Scotland. 
These projects will collectively enable the
revision of flood mapping for the coastline
from Scrabster to Arbroath including the
Orkney Islands. 
It is planned to complete this
action in 2023. 
Page 111

Page 112

ap 
Page 22         
Strategic
mapping and
modelling
G Scottish Water are undertaking investigation
and modelling in the Lossiemouth sewer
catchment to improve knowledge and
understanding of flood risk in this area.
Scottish
Water
2019 On track to deliver within agreed LFRMP
timescales 
Complete 
6.3 Findhorn, Nairn and Speyside Plan District (PVA 05/03)
Local Plan District Local authority Main catchment
Findhorn, Nairn and Speyside The Moray Council Moray coastal
Summary of Progress for Lhanbryde (PVA 05/03) 
The area has a risk of river, surface water, coastal
flooding. The majority of damages are caused by
river flooding. There are approximately 60
residential properties and 10 non-residential
properties at risk of flooding. The Annual Average
Damages are approximately £160, 000. Further
information can be found in the LFRMP under PVA
05/03.
Link to LFRMP PVA 05/03
Key progress:
• Strategic mapping and modelling –
Scottish Water have reviewed the highest
risk sewer catchment areas 
• Maintenance to existing Lhanbryde Flood
Protection Scheme has been carried out
by Moray Council 
Annual Average Damages by flood source
Overview of actions to manage flooding in PVA 05/03
Page 112

Page 113

ap 
Page 23         
PVA Flood Protection Scheme
W
orks
Natural Flood
Management W
orks
New
Flood W
arning
Flood Protection Study
Natural Flood
Management Study
Surface W
ater Plan/Study
Strategic Mapping and
Modelling SEPA
Coastal
Strategic Mapping and
Modelling SEPA
Pluvial/Fluvial
Strategic Mapping and
Modelling Scottish W
ater
Maintain Flood Protection
Scheme
Maintain Flood W
arning
Flood Forecasting
Property Level Protection
Scheme
Community Flood Action
Group
Self Help
Awareness Raising
Maintenance
Site Protection Plan
Emergency Response
Plan
Planning Policy
05/03                     
Summary of progress of actions to manage flood risk in PVA 05/03
Action Status
(Red;
Amber;
Green)
Description Delivery
Lead
Planned
Dates
Progress in Delivery, including key
deliverables and dates
Revised dates and planned actions to
complete / address delay
Maintain Flood
Scheme
G Continue to maintain the Lhanbryde Flood
Prevention Scheme.
Moray
Council
2019 Moray Council continue to maintain
the Lhanbryde Flood Prevention
Scheme.
Moray Council will continue to
maintain this scheme.
Strategic mapping
and modelling
G Scottish Water are undertaking
investigation and modelling in the
Lossiemouth sewer catchment to improve
knowledge and understanding of flood
risk in this area. 
Scottish
Water
2019 On track to deliver within agreed
LFRMP timescales 
Complete  
Page 113

Page 114

ap 
Page 24         
6.4 Findhorn, Nairn and Speyside Plan District (PVA 05/04)
Local Plan District Local authority Main catchment
Findhorn, Nairn and Speyside The Moray Council River Spey, Spey Bay coastal 
Summary of Progress for Spey Bay (PVA 05/04) 
The area has a risk of river, surface water, coastal
flooding. The majority of damages are caused by
river flooding. There are approximately 40
residential properties and >10 non-residential
properties at risk of flooding. The Annual Average
Damages are approximately £120, 000. Further
information can be found in the LFRMP under PVA
05/04.
Link to LFRMP PVA 05/04
Key progress:
• Strategic mapping and modelling –
Coastal, SEPA have been updated the
coastal flood maps 
• SEPA continuing to provide flood
forecasting to the local area 
Annual Average Damages by flood source
Overview of actions to manage flooding in PVA 05/04
PVA Flood Protection Scheme
W
orks
Natural Flood
Management W
orks
New
Flood W
arning
Flood Protection Study
Natural Flood
Management Study
Surface W
ater Plan/Study
Strategic Mapping and
Modelling SEPA
Coastal
Strategic Mapping and
Modelling SEPA
Pluvial/Fluvial
Strategic Mapping and
Modelling Scottish W
ater
Maintain Flood Protection
Scheme
Maintain Flood W
arning
Flood Forecasting
Property Level Protection
Scheme
Community Flood Action
Group
Self Help
Awareness Raising
Maintenance
Site Protection Plan
Emergency Response
Plan
Planning Policy
Page 114

Page 115

ap 
Page 25         
05/04                     
Summary of progress of actions to manage flood risk in PVA 05/04
Action Status
(Red;
Amber;
Green)
Description Delivery
Lead
Planned
Dates
Progress in Delivery, including key
deliverables and dates
Revised dates and planned actions to
complete / address delay
Strategic mapping
and modelling -
Coastal
A SEPA plan to develop the flood hazard
mapping in the Banff to Lossiemouth area
to improve understanding of coastal flood
risk.
SEPA 2017 Following the establishment of a
coastal flood hazard map
development framework and
characterisation of the coastline,
several projects are currently
underway at this location: 
• Development of a national coastal
joint probability dataset; 
• Update to the UK design extreme
sea level dataset; 
• Coastal modelling and mapping
project for north-east Scotland. 
These projects will collectively enable
the revision of flood mapping for the
coastline from Scrabster to Arbroath
including the Orkney Islands.
It is planned to complete this action in
2023. 
Strategic mapping
and modelling
A SEPA undertook to incorporate additional
surface water hazard mapping
information into the flood maps to
improve understanding of flood risk.
SEPA 2018 SEPA's current surface water hazard
maps use design rainfall estimates
based on FEH99 methodology, this
has now been superseded by FEH13
methodology. The FEH13 dataset
This action will not be taken forwards
as described. SEPA will develop new
surface water flood hazard maps over
the remainder of Cycle 1. It is
anticipated that updated flood
Page 115

Page 116

ap 
Page 26         
contains the latest science and
understanding of rainfall across
Scotland and represents a significant
change in rainfall amounts compared
to FEH99 dataset, as such it is no
longer consider appropriate to deliver
this action as originally intended. 
mapping from this revised action will
be available early in Cycle 2. 
Alongside this SEPA will investigate
the feasibility of developing an interim
approach to assess the change in
surface water hazard (and risk)
associated with FEH13, such that we
could consider it in the development
of the 2021 FRM Strategies.
Strategic mapping
and modelling
G Scottish Water are undertaking
investigation and modelling in the
Lossiemouth sewer catchment to improve
knowledge and understanding of flood
risk in this area. 
Scottish
Water
2019 On track to deliver within agreed
LFRMP timescales 
Complete
Maintain flood
warning
G Continue to maintain the Findhorn to
Lossiemouth flood warning area which is
part of the Moray Firth Flood Warning
scheme.
SEPA Ongoing SEPA has continued to operate the
flood warning service 
SEPA will continue to operate the
flood warning service 
Community Flood
Action Group
A Engage with flood action groups in the
Garmouth and Kingston area with regard
to flooding issues
Community Ongoing No flood action groups in this area
have communicated with the
responsible authorities since
publishing the plan in 2016.
Moray Council will continue to work
with interested parties to inform
about flood risk  
Page 116

Page 117

ap 
Page 27         
6.5 Findhorn, Nairn and Speyside Plan District (PVA 05/05)
Local Plan District Local authority Main catchment
Findhorn, Nairn and Speyside The Moray Council River Lossie 
Summary of Progress for Elgin (PVA 05/05) 
The area has a risk of river, surface water flooding.
The majority of damages are caused by river
flooding. There are approximately 140 residential
properties and 110 non-residential properties at
risk of flooding. The Annual Average Damages are
approximately £750, 000. Further information can
be found in the LFRMP under PVA 05/05.
Link to LFRMP PVA 05/05
Key progress:
• Maintenance to existing Elgin Flood
Protection Scheme has been carried out
by Moray Council
• SEPA continuing to provide flood
forecasting and flood warnings to the
local area 
Annual Average Damages by flood source
Overview of actions to manage flooding in PVA 05/05
PVA Flood Protection Scheme
W
orks
Natural Flood
Management W
orks
New
Flood W
arning
Flood Protection Study
Natural Flood
Management Study
Surface W
ater Plan/Study
Strategic Mapping and
Modelling SEPA
Coastal
Strategic Mapping and
Modelling SEPA
Pluvial/Fluvial
Strategic Mapping and
Modelling Scottish W
ater
Maintain Flood Protection
Scheme
Maintain Flood W
arning
Flood Forecasting
Property Level Protection
Scheme
Community Flood Action
Group
Self Help
Awareness Raising
Maintenance
Site Protection Plan
Emergency Response
Plan
Planning Policy
05/05                    
Page 117

Page 118

ap 
Page 28         
Summary of progress of actions to manage flood risk in PVA 05/05
Action Status
(Red;
Amber;
Green)
Description Delivery
Lead
Planned
Dates
Progress in Delivery, including key
deliverables and dates
Revised dates and planned actions to
complete / address delay
Maintain Flood
Scheme
G Continue to maintain the Elgin Flood
Prevention Scheme.
Moray
Council
2019 Moray Council continue to maintain
the Elgin Flood Prevention Scheme.
Moray Council will continue to
maintain this scheme.
Surface Water
Plans/Study
G Elgin is a priority area within the Surface
Water Management Plan that Moray
Council will prepare for Moray.
Moray
Council
2019 The high level Surface Water
Management Plan for this area is
complete and actions identified will be
developed for inclusion as works in
future cycles.
Action complete.
Strategic mapping
and modelling
A SEPA undertook to incorporate additional
surface water hazard mapping
information into the flood maps to
improve understanding of flood risk.
SEPA 2018 SEPA's current surface water hazard
maps use design rainfall estimates
based on FEH99 methodology, this has
now been superseded by FEH13
methodology. The FEH13 dataset
contains the latest science and
understanding of rainfall across
Scotland and represents a significant
change in rainfall amounts compared
to FEH99 dataset, as such it is no
longer consider appropriate to deliver
this action as originally intended.
This action will not be taken forwards
as described. SEPA will develop new
surface water flood hazard maps over
the remainder of Cycle 1. It is
anticipated that updated flood
mapping from this revised action will
be available early in Cycle 2. 
Alongside this SEPA will investigate
the feasibility of developing an interim
approach to assess the change in
surface water hazard (and risk)
associated with FEH13, such that we
could consider it in the development
of the 2021 FRM Strategies.
Page 118

Page 119

ap 
Page 29         
Maintain flood
warning
G Continue to maintain flood warning in
Elgin, which warns of flooding from the
River Lossie.
SEPA Ongoing SEPA has continued to operate the
flood warning service 
SEPA will continue to operate the
flood warning service 
Strategic mapping
and modelling
G Scottish Water are undertaking
investigation and modelling in the
Lossiemouth sewer catchment to improve
knowledge and understanding of flood
risk in this area.
Scottish
Water
2019 On track to deliver within agreed
LFRMP timescales.
2019  
Page 119

Page 120

ap 
Page 30         
6.6 Findhorn, Nairn and Speyside Plan District (PVA 05/06)
Local Plan District Local authority Main catchment
Findhorn, Nairn and Speyside The Moray Council Moray coastal 
Summary of Progress for Forres (PVA 05/06) 
The area has a risk of river, surface water flooding.
The majority of damages are caused by river
flooding. There are approximately 200 residential
properties and 20 non-residential properties at
risk of flooding. The Annual Average Damages are
approximately £380, 000. Further information can
be found in the LFRMP under PVA 05/06.
Link to LFRMP PVA 05/06
Key progress:
• Strategic mapping and modelling has been
carried out by Scottish Water for high risk
sewer catchment areas 
• The Moray Council have continued to
carry out maintenance of the flood
protection schemes and the surrounding
waterways to reduce the overall flood risk 
Annual Average Damages by flood source
Overview of actions to manage flooding in PVA 05/06
PVA Flood Protection Scheme
W
orks
Natural Flood
Management W
orks
New
Flood W
arning
Flood Protection Study
Natural Flood
Management Study
Surface W
ater Plan/Study
Strategic Mapping and
Modelling SEPA
Coastal
Strategic Mapping and
Modelling SEPA
Pluvial/Fluvial
Strategic Mapping and
Modelling Scottish W
ater
Maintain Flood Protection
Scheme
Maintain Flood W
arning
Flood Forecasting
Property Level Protection
Scheme
Community Flood Action
Group
Self Help
Awareness Raising
Maintenance
Site Protection Plan
Emergency Response
Plan
Planning Policy
Page 120

Page 121

ap 
Page 31         
05/06                    
Summary of progress of actions to manage flood risk in PVA 05/06
Action Status
(Red;
Amber;
Green)
Description Delivery
Lead
Planned
Dates
Progress in Delivery, including key
deliverables and dates
Revised dates and planned actions to
complete / address delay
Maintain Flood
Scheme
G Continue to maintain the Burn of Mosset
Flood Prevention Scheme.
Moray
Council
2019 Moray Council continue to maintain
the Burn of Mosset Flood Prevention
Scheme.
Moray Council will continue to
maintain this scheme.
Surface Water
Plans/Study
A Forres is a priority area within the Surface
Water Management Plan that Moray
Council will prepare for Moray.
Moray
Council
2019 The proposed Integrated Catchment
Study for Forres has been
downgraded to a Section 16
assessment that will be completed in
2020.  The findings of this assessment
will inform the Surface Water
Management Plan for Forres.
The Surface Water Management Plan
for the Forres area will be developed
between 2020 and 2024.
Strategic mapping
and modelling
G Scottish Water are undertaking
investigation and modelling in the Forres
sewer catchment to improve knowledge
and understanding of flood risk in this
area. 
Scottish
Water
2020 On track to deliver within agreed
LFRMP timescales 
Complete 
Maintain flood
warning
G Continue to maintain flood warning in
Forres, which warns of flooding from the
River Findhorn.
SEPA Ongoing SEPA has continued to operate the
flood warning service 
SEPA will continue to operate the
flood warning service 
Page 121

Page 122

ap 
Page 32         
Page 122

Page 123

ap 
Page 33         
6.7 Findhorn, Nairn and Speyside Plan District (PVA 05/07)
Local Plan District Local authority Main catchment
Findhorn, Nairn and Speyside The Moray Council River Findhorn
Summary of Progress for Findhorn (PVA 05/07) 
The area has a risk of river, surface water flooding.
The majority of damages are caused by river
flooding. There are approximately 100 residential
properties and >10 non-residential properties at
risk of flooding. The Annual Average Damages are
approximately £200, 000. Further information can
be found in the LFRMP under PVA 05/07.
Link to LFRMP PVA 05/07
Key progress:
• The Moray Council have completed a
surface water plan/study to improve
knowledge surrounding surface water
floods to help reduce the risks 
• The Moray Council have continued to
carry out maintenance of the flood
protection schemes to reduce the overall
flood risk 
Annual Average Damages by flood source
Overview of actions to manage flooding in PVA 05/07
PVA Flood Protection Scheme
W
orks
Natural Flood
Management W
orks
New
Flood W
arning
Flood Protection Study
Natural Flood
Management Study
Surface W
ater Plan/Study
Strategic Mapping and
Modelling SEPA
Coastal
Strategic Mapping and
Modelling SEPA
Pluvial/Fluvial
Strategic Mapping and
Modelling Scottish W
ater
Maintain Flood Protection
Scheme
Maintain Flood W
arning
Flood Forecasting
Property Level Protection
Scheme
Community Flood Action
Group
Self Help
Awareness Raising
Maintenance
Site Protection Plan
Emergency Response
Plan
Planning Policy
05/07                    
Page 123

Page 124

ap 
Page 34         
Summary of progress of actions to manage flood risk in PVA 05/07
Action Status
(Red;
Amber;
Green)
Description Delivery
Lead
Planned
Dates
Progress in Delivery, including key
deliverables and dates
Revised dates and planned actions to
complete / address delay
Maintain Flood
Scheme
G Continue to maintain the Findhorn
Flood Prevention Scheme.
Moray
Council
2019 Moray Council continue to maintain
the Findhorn Flood Prevention
Scheme.
Moray Council will continue to
maintain this scheme.
Surface Water
Plans/Study
A Forres is a priority area within the
Surface Water Management Plan that
Moray Council will prepare for Moray.
Moray
Council
2019 The proposed Integrated
Catchment Study for Forres has
been downgraded to a Section 16
assessment that will be completed
in 2020.  The findings of this
assessment will inform the Surface
Water Management Plan for
Forres.
The Surface Water Management
Plan for the Forres area will be
developed between 2020 and
2024.
Strategic mapping
and modelling
G Scottish Water are undertaking
investigation and modelling in the
Forres sewer catchment to improve
knowledge and understanding of flood
risk in this area. 
Scottish
Water
2020 On track to deliver within agreed
LFRMP timescales 
Complete
Maintain flood
warning
G Continue to maintain flood warning in
Forres, which warns of flooding from
the River Findhorn.
SEPA Ongoing SEPA has continued to operate the
flood warning service 
SEPA will continue to operate the
flood warning service 
Page 124

Page 125

ap 
Page 35         
6.8 Findhorn, Nairn and Speyside Plan District (PVA 05/08)
Local Plan District Local authority Main catchment
Findhorn, Nairn and Speyside The Highland Council  River Nairn
Summary of Progress for Nairn East and Auldearn (PVA 05/08) 
The area has a risk of river, surface water and
coastal flooding. The majority of damages are
caused by river flooding. There are approximately
80 residential properties and 30 non-residential
properties at risk of flooding. The Annual Average
Damages are approximately £230, 000. Further
information can be found in the LFRMP under PVA
05/08.
Link to LFRMP PVA 05/08
Key progress:
• Strategic mapping and modelling has been
carried out by Scottish Water for high risk
sewer catchment areas 
• SEPA continuing to provide flood
forecasting and flood warnings to the
local area 
Annual Average Damages by flood source
Overview of actions to manage flooding in PVA 05/08
PVA Flood Protection Scheme
W
orks
Natural Flood
Management W
orks
New
Flood W
arning
Flood Protection Study
Natural Flood
Management Study
Surface W
ater Plan/Study
Strategic Mapping and
Modelling SEPA
Coastal
Strategic Mapping and
Modelling SEPA
Pluvial/Fluvial
Strategic Mapping and
Modelling Scottish W
ater
Maintain Flood Protection
Scheme
Maintain Flood W
arning
Flood Forecasting
Property Level Protection
Scheme
Community Flood Action
Group
Self Help
Awareness Raising
Maintenance
Site Protection Plan
Emergency Response
Plan
Planning Policy
05/08                    
Page 125

Page 126

ap 
Page 36         
Summary of progress of actions to manage flood risk in PVA 05/08
Action Status
(Red;
Amber;
Green)
Description Delivery
Lead
Planned
Dates
Progress in Delivery, including key
deliverables and dates
Revised dates and planned actions to
complete / address delay
Flood Protection
Study
A The Highland Council will undertake a
Flood Protection Study to further
investigate the feasibility of developing a
Flood Protection Scheme (or Works) for
central Nairn.
The
Highland
Council
2022 The Highland Council has started the
Flood Protection Study for the River
Nairn which also includes its tributary
the Auldearn Burn in 2022 with a
hydraulic modelling study of the river
and a damages assessment. This study
will continue into cycle 2 and
depending on the outcome of the first
stage of the study, will move on to an
Option Appraisal Assessment,
identifying a preferred solution to the
flood risk.
The Highland Council plan to complete
during cycle 2. 
Strategic mapping
and modelling
G Scottish Water are undertaking
investigation and modelling in the Nairn
sewer catchment to improve knowledge
and understanding of flood risk in this
area. 
Scottish
Water
2020 On track to deliver within agreed
LFRMP timescales 
2020
Page 126

Page 127

ap 
Page 37         
Maintain flood
warning
G Continue to maintain flood warning in
Nairn, which warns of flooding from the
River Nairn.
SEPA Ongoing SEPA has continued to operate the
flood warning service. SEPA has
merged the 'Nairn (River Park)' and
'Nairn' flood warning areas to create a
new flood warning area for 'Nairn'.
SEPA will continue to operate the
flood warning service 
6.9 6.9 Findhorn, Nairn and Speyside Plan District (PVA 05/09)
Local Plan District Local authority Main catchment
Findhorn, Nairn and Speyside The Moray Council  River Spey
Summary of Progress for Rothes and Aberlour (PVA 05/09) 
The area has a risk of river, surface water flooding.
The majority of damages are caused by river
flooding. There are approximately 350 residential
properties and 100 non-residential properties at
risk of flooding. The Annual Average Damages are
approximately £390, 000. Further information can
be found in the LFRMP under PVA 05/09.
Link to LFRMP PVA 05/09
Key progress:
• The Moray Council have completed a
surface water plan/study to improve
knowledge surrounding surface water
floods to help reduce the risks 
• The Moray Council have continued to
carry out maintenance of the flood
protection schemes and the local
waterways to reduce the overall flood risk 
Annual Average Damages by flood source
Overview of actions to manage flooding in PVA 05/09
Page 127

Page 128

ap 
Page 38         
PVA Flood Protection Scheme
W
orks
Natural Flood
Management W
orks
New
Flood W
arning
Flood Protection Study
Natural Flood
Management Study
Surface W
ater Plan/Study
Strategic Mapping and
Modelling SEPA
Coastal
Strategic Mapping and
Modelling SEPA
Pluvial/Fluvial
Strategic Mapping and
Modelling Scottish W
ater
Maintain Flood Protection
Scheme
Maintain Flood W
arning
Flood Forecasting
Property Level Protection
Scheme
Community Flood Action
Group
Self Help
Awareness Raising
Maintenance
Site Protection Plan
Emergency Response
Plan
Planning Policy
05/09                     
Summary of progress of actions to manage flood risk in PVA 05/09
Action Status
(Red;
Amber;
Green)
Description Delivery
Lead
Planned
Dates
Progress in Delivery, including key
deliverables and dates
Revised dates and planned actions to
complete / address delay
Maintain Flood
Scheme
G Continue to maintain the Aberlour
Flood Prevention Scheme.
Moray
Council
2019 Moray Council continue to maintain
the Aberlour Flood Prevention
Scheme.
Moray Council will continue to
maintain this scheme.
Maintain Flood
Scheme
G Continue to maintain the Rothes Flood
Prevention Scheme.
Moray
Council
2019 Moray Council continue to maintain
the Rothes Flood Prevention
Scheme.
Moray Council will continue to
maintain this scheme.
Surface Water
Plans/Study
G Rothes and Aberlour is a priority area
within the Surface Water Management
Plan that Moray Council will prepare
for Moray.
Moray
Council
2019 The high level Surface Water
Management Plan for this area is
complete and actions identified will
be developed for inclusion as
works in future cycles.
Action complete.
Strategic mapping
and modelling
G Scottish Water are undertaking
investigation and modelling in the
Aberlour and Rothes catchment to
Scottish
Water
2020 On track to deliver within agreed
LFRMP timescales
2020
Page 128

Page 129

ap 
Page 39         
improve knowledge and understanding
of flood risk in this area. 
Maintain flood
warning
G Continue to maintain flood warning in
Rothes and Aberlour, which warns of
flooding from the River Spey.
SEPA Ongoing SEPA has continued to operate the
flood warning service 
SEPA will continue to operate the
flood warning service 
Flood Protection
Works
G Flood protection works to reduce
flooding to an electricity sub-station in
Rothes.
Asset
owner
2021 No information currently available Works programmed for completion
in 2033.  
Page 129

Page 130

ap 
Page 40         
6.10 Findhorn, Nairn and Speyside Plan District (PVA 05/10)
Local Plan District Local authority Main catchment
Findhorn, Nairn and Speyside The Highland Council  River Spey
Summary of Progress for Carrbridge (PVA 05/10) 
The area has a risk of river, surface water flooding.
The majority of damages are caused by surface
water flooding. There are fewer than 10
residential properties and non-residential
properties at risk of flooding. The Annual Average
Damages are approximately £9, 000. Further
information can be found in the LFRMP under PVA
05/10.
Link to LFRMP PVA 05/10
Key progress:
• The Highland Council have continued to
carry out maintenance the local
waterways to reduce the overall flood risk
•  SEPA continuing to provide flood
forecasting and flood warnings to the
local area 
Annual Average Damages by flood source
Overview of actions to manage flooding in PVA 05/08
PVA Flood Protection Scheme
W
orks
Natural Flood
Management W
orks
New
Flood W
arning
Flood Protection Study
Natural Flood
Management Study
Surface W
ater Plan/Study
Strategic Mapping and
Modelling SEPA
Coastal
Strategic Mapping and
Modelling SEPA
Pluvial/Fluvial
Strategic Mapping and
Modelling Scottish W
ater
Maintain Flood Protection
Scheme
Maintain Flood W
arning
Flood Forecasting
Property Level Protection
Scheme
Community Flood Action
Group
Self Help
Awareness Raising
Maintenance
Site Protection Plan
Emergency Response
Plan
Planning Policy
05/08                    
Page 130

Page 131

ap 
Page 41         
Summary of progress of actions to manage flood risk in PVA 05/10
Action Status
(Red;
Amber;
Green)
Description Delivery
Lead
Planned
Dates
Progress in Delivery, including key
deliverables and dates
Revised dates and planned actions to
complete / address delay
Maintain flood
warning
G Continue to maintain flood warning in
Rothes and Aberlour, which warns of
flooding from the River Spey.
SEPA Ongoing SEPA has continued to operate the
flood warning service
SEPA will continue to operate the
flood warning service  
Page 131

Page 132

ap 
Page 42         
6.11 Findhorn, Nairn and Speyside Plan District (PVA 05/11)
Local Plan District Local authority Main catchment
Findhorn, Nairn and Speyside The Highland Council  River Spey
Summary of Progress for Aviemore and Boat of Garten (PVA 05/11) 
The area has a risk of river, surface water flooding.
The majority of damages are caused by surface
water flooding. There are approximately 70
residential properties and 30 non-residential
properties at risk of flooding. The Annual Average
Damages are approximately £180, 000. Further
information can be found in the LFRMP under PVA
05/11.
Link to LFRMP PVA 05/11
Key progress:
• Strategic mapping and modelling has been
carried out by Scottish Water for high risk
sewer catchment areas 
• SEPA continuing to provide flood
forecasting and flood warnings to the
local area 
Annual Average Damages by flood source
Overview of actions to manage flooding in PVA 05/11
PVA Flood Protection Scheme
W
orks
Natural Flood
Management W
orks
New
Flood W
arning
Flood Protection Study
Natural Flood
Management Study
Surface W
ater Plan/Study
Strategic Mapping and
Modelling SEPA
Coastal
Strategic Mapping and
Modelling SEPA
Pluvial/Fluvial
Strategic Mapping and
Modelling Scottish W
ater
Maintain Flood Protection
Scheme
Maintain Flood W
arning
Flood Forecasting
Property Level Protection
Scheme
Community Flood Action
Group
Self Help
Awareness Raising
Maintenance
Site Protection Plan
Emergency Response
Plan
Planning Policy
05/11                    
Page 132

Page 133

ap 
Page 43         
Summary of progress of actions to manage flood risk in PVA 05/11
Action Status
(Red;
Amber;
Green)
Description Delivery
Lead
Planned
Dates
Progress in Delivery, including key
deliverables and dates
Revised dates and planned actions to
complete / address delay
Flood Protection
Study
R A flood study will investigate the
feasibility of providing flood protection
for the Dalfaber Road area of Aviemore
from the River Spey.
The
Highland
Council
2022 Due to a reduction of funding to The
Highland Council's Capital Programme
(March 2018) this study did not
progress.
This will be prioritised against actions
in cycle 2. 
Strategic mapping
and modelling
G Scottish Water are undertaking
investigation and modelling in the
Aviemore sewer catchment to improve
knowledge and understanding of flood
risk in this area.
Scottish
Water
2018 On track to deliver within agreed
LFRMP timescales
2018
Maintain flood
warning
G Continue to maintain flood warning in
Aviemore, which warns of flooding from
the River Spey.
SEPA Ongoing SEPA has continued to operate the
flood warning service
SEPA will continue to operate the
flood warning service  
Page 133

Page 134

ap 
Page 44         
6.12 Findhorn, Nairn and Speyside Plan District (PVA 05/12)
Local Plan District Local authority Main catchment
Findhorn, Nairn and Speyside The Highland Council  River Spey
Summary of Progress for Kingussie (PVA 05/12) 
The area has a risk of river, surface water flooding.
The majority of damages are caused by river
flooding. There are approximately 30 residential
properties and 20 non-residential properties at
risk of flooding. The Annual Average Damages are
approximately £92, 000. Further information can
be found in the LFRMP under PVA 05/12.
Link to LFRMP PVA 05/12
Key progress:
• The Highland Council completed a flood
protection study to help reduce the risk of
flooding from the Gynack Burn 
• SEPA continuing to provide flood
forecasting and flood warnings to the
local area 
Annual Average Damages by flood source
Overview of actions to manage flooding in PVA 05/12
PVA Flood Protection Scheme
W
orks
Natural Flood
Management W
orks
New
Flood W
arning
Flood Protection Study
Natural Flood
Management Study
Surface W
ater Plan/Study
Strategic Mapping and
Modelling SEPA
Coastal
Strategic Mapping and
Modelling SEPA
Pluvial/Fluvial
Strategic Mapping and
Modelling Scottish W
ater
Maintain Flood Protection
Scheme
Maintain Flood W
arning
Flood Forecasting
Property Level Protection
Scheme
Community Flood Action
Group
Self Help
Awareness Raising
Maintenance
Site Protection Plan
Emergency Response
Plan
Planning Policy
05/12                     
Page 134

Page 135

ap 
Page 45         
Page 135

Page 136

ap 
Page 46         
Summary of progress of actions to manage flood risk in PVA 05/12
Action Status
(Red;
Amber;
Green)
Description Delivery
Lead
Planned
Dates
Progress in Delivery, including key
deliverables and dates
Revised dates and planned actions to
complete / address delay
Flood Protection
Study
A A flood study to investigate the
feasibility of providing flood protection
for Kingussie from the River Gynack.
The
Highland
Council
2019 The Highland Council have
completed the first stage with a
hydraulic modelling study of the
River Gynack. This study will
continue into cycle 2 with an
Option Appraisal Assessment,
identifying preferred solutions to
reduce the flood risk.
The Highland Council plans to
commission a Flood Protection
Study during Cycle 2. 
Strategic mapping
and modelling
G Scottish Water are undertaking
investigation and modelling in the
Kingussie sewer catchment to improve
knowledge and understanding of flood
risk in this area.
Scottish
Water
2019 On track to deliver within agreed
LFRMP timescales 
2019
Maintain flood
warning
G Continue to maintain flood warning in
Aviemore, which warns of flooding
from the River Spey.
SEPA Ongoing SEPA has continued to operate the
flood warning service
SEPA will continue to operate the
flood warning service 
Page 136

Page 137

ap 
Page 47         
6.13 Findhorn, Nairn and Speyside Plan District (PVA 05/13)
Local Plan District Local authority Main catchment
Findhorn, Nairn and Speyside The Highland Council  River Spey
Summary of Progress for Newtonmore (PVA 05/13) 
The area has a risk of surface water and river
flooding. The majority of damages are caused by
surface water flooding. There are approximately
20 residential properties and 20 non-residential
properties at risk of flooding. The Annual Average
Damages are approximately £41, 000. Further
information can be found in the LFRMP under PVA
05/13.
Link to LFRMP PVA 05/13
Key progress:
• The Highland Council have continued to
carry out maintenance the local
waterways to reduce the overall flood risk
• SEPA continuing to provide flood
forecasting and flood warnings to the
local area 
Annual Average Damages by flood source
Overview of actions to manage flooding in PVA 05/13
PVA Flood Protection Scheme
W
orks
Natural Flood
Management W
orks
New
Flood W
arning
Flood Protection Study
Natural Flood
Management Study
Surface W
ater Plan/Study
Strategic Mapping and
Modelling SEPA
Coastal
Strategic Mapping and
Modelling SEPA
Pluvial/Fluvial
Strategic Mapping and
Modelling Scottish W
ater
Maintain Flood Protection
Scheme
Maintain Flood W
arning
Flood Forecasting
Property Level Protection
Scheme
Community Flood Action
Group
Self Help
Awareness Raising
Maintenance
Site Protection Plan
Emergency Response
Plan
Planning Policy
Page 137

Page 138

ap 
Page 48         
05/13                     
Summary of progress of actions to manage flood risk in PVA 05/13
Action Status
(Red;
Amber;
Green)
Description Delivery
Lead
Planned
Dates
Progress in Delivery, including key
deliverables and dates
Revised dates and planned actions to
complete / address delay
Surface Water
Plan/Study
G The Highland Council will develop a
Highland-wide Surface Water
Management Plan. Newtonmore will
be one of the focus areas. 
The
Highland
Council
Cycle 2 The Highland Council have started
working on developing its SWMP.
Hotspots within the priority areas
have been identified and give
priorities and objectives. For
Newtonmore this initial
assessment determined that it
should no longer be considered a
priority area and no further
assessment for Newtonmore will
be carried out. 
Strategic mapping
and modelling
G Scottish Water are undertaking
investigation and modelling in the
Newtonmore sewer catchment to
improve knowledge and
understanding of flood risk in this
area.
Scottish
Water
2019 On track to deliver within agreed
LFRMP timescales 
2019
Maintain flood
warning
G Continue to maintain flood warning in
Newtonmore, which warns of flooding
from the River Spey.
SEPA Ongoing SEPA has continued to operate the
flood warning service.
SEPA will continue to operate the
flood warning service
Page 138

Page 139

ap 
Page 49         
Community Flood
Action Groups
G The Newtonmore Community Council
and Newtonmore Community
Woodlands and Development Trust
have engaged with authorities with
respect to flooding issues in the past
Community  The Highland Council has engaged
with local groups in the
development of the Surface Water
Management Plan. 
Further engagement will be carried
out to build resilience and raise
awareness.  
Page 139

Page 140

ap 
Page 50         
6.14 Findhorn, Nairn and Speyside Plan District (PVA 05/14)
Local Plan District Local authority Main catchment
Findhorn, Nairn and Speyside The Highland Council  River Spey
Summary of Progress for Dalwhinnie (PVA 05/14) 
The area has a risk of river flooding. The majority
of damages are caused by river flooding. There are
approximately 20 residential properties and >10
non-residential properties at risk of flooding. The
Annual Average Damages are approximately £170,
000. Further information can be found in the
LFRMP under PVA 05/14.
Link to LFRMP PVA 05/14
Key progress:
• The Highland Council have continued to
carry out maintenance the local
waterways to reduce the overall flood risk
• SEPA continuing to provide flood
forecasting to the local area to help local
prepare for a potential flood   
Annual Average Damages by flood source
Overview of actions to manage flooding in PVA 05/14
PVA Flood Protection Scheme
W
orks
Natural Flood
Management W
orks
New
Flood W
arning
Flood Protection Study
Natural Flood
Management Study
Surface W
ater Plan/Study
Strategic Mapping and
Modelling SEPA
Coastal
Strategic Mapping and
Modelling SEPA
Pluvial/Fluvial
Strategic Mapping and
Modelling Scottish W
ater
Maintain Flood Protection
Scheme
Maintain Flood W
arning
Flood Forecasting
Property Level Protection
Scheme
Community Flood Action
Group
Self Help
Awareness Raising
Maintenance
Site Protection Plan
Emergency Response
Plan
Planning Policy
05/14                    
Page 140

Page 141

ap 
Page 51         
Summary of progress of actions to manage flood risk in PVA 05/14
Action Status
(Red;
Amber;
Green)
Description Delivery
Lead
Planned
Dates
Progress in Delivery, including key
deliverables and dates
Revised dates and planned actions to
complete / address delay
Strategic mapping
and modelling
A SEPA will develop the strategic
mapping for the River Trium in
Dalwhinnie, taking into consideration
information from the A9 dualling. 
SEPA 2021 As part of the ongoing A9 Dualling
Programme, a topographic survey
has been undertaken. A modelling
study on the River Truim has been
undertaken as part of the A9
Dalwhinnie to Crubenmore road
project. 
Clarification is being sought from
Transport Scotland over the likely
timescales for the availability of this
study.   
SEPA will await the conclusion of
this study and a final route
selection for the A9 at this location
before progressing further with this
action.  Given the ongoing A9
dualling programme it is
anticipated that this action will not
progress to a study prior to Cycle
2.  SEPA will continue to engage
with Transport Scotland and their
contractors for any opportunities to
progress this action prior to Cycle 2
if appropriate. 
Page 141

Page 142

ap 
Page 52 
Annex 1: Actions
Annex 1 provides a full list of Findhorn, Nairn and Speyside Local Plan District Cycle 1 Actions
and is available for download from the Moray Council website here –
http://www.moray.gov.uk/moray_standard/page_80332.html 
Page 142

Page 143

ap 
Page 53 
Annex 2: Roles and Responsibilities
Individuals are the first line of defence against flooding. However, public bodies have
responsibilities too and are working together to reduce the impacts of flooding in Scotland.
Responsibility for flood risk management planning falls in the main to SEPA, local authorities
and Scottish Water. However, individuals have a personal responsibility to protect
themselves and their property.
Some of the key roles are outlined below and more information is available from the SEPA
website.
Your responsibilities
Organisations and individuals have responsibilities to protect themselves from flooding.
Being prepared by knowing what to do and who to contact if flooding happens can help you
reduce the damage and disruption flooding can have on your life.
The first step to being prepared is to sign up to Floodline - www.floodlinescotland.org.uk - to
receive messages to let you know where and when flooding is likely to happen. Other useful
tools and advice on how to be prepared are available on the Floodline website including a
quick guide to who to contact in the event of a flood. You can also check how your area
could be affected by flooding by looking at SEPA’s flood maps -
www.sepa.org.uk/environment/water/flooding/flood-maps
SEPA
SEPA is Scotland’s national flood forecasting, flood warning and strategic flood risk
management authority. SEPA has a statutory duty to produce Scotland's Flood Risk
Management Strategies. SEPA works closely with other organisations responsible for
managing flood risk through a network of partnerships and stakeholder groups to ensure
that a nationally consistent approach to flood risk management is adopted.
SEPA also has a responsibility to identify where in Scotland there is the potential for natural
flood management techniques to be introduced. Natural flood management is the use of the
natural features of the land to store and slow down the flow of water.
In running Floodline, SEPA provides live flooding information and advice on how to prepare
for or cope with the impacts of flooding 24 hours a day, seven days a week. To help forecast
for flooding SEPA works closely with the Met Office.
To raise awareness of flooding at a national level, SEPA runs education initiatives,
community engagement programmes and an annual campaign to promote the useful advice
and information available through Floodline. SEPA works in partnership with local
authorities, Neighbourhood Watch Scotland, Ready Scotland and others to share resources
and help to promote preparedness and understanding of how flood risk is managed.
SEPA has a statutory role in relation to the provision of flood risk advice to planning
authorities. This role is expressed in Section 72 of the FRM Act, 2009. SEPA also has a duty to
co-operate with planning authorities in the preparation of development plans. When
consulted in relation to planning applications for development or site allocations in
development plans, and where the planning authority considers there may be a risk of
Page 143

Page 144

ap 
Page 54 
flooding, SEPA will provide advice. The advice provided by SEPA will be with respect to the
risk of flooding and on the basis of the relevant information it holds which is suitable for
planning purposes. It will also be in line with the principles and duties set out in the FRM Act.
Further information about how SEPA engage in the planning system, including guidance on
flood risk and planning is available on SEPA website
www.sepa.org.uk/environment/land/planning
Local authorities
Local authorities work together for flood risk management planning purposes through a
single lead authority which has the responsibility to produce a Local Flood Risk Management
Plan. Local authorities have been working collaboratively in the manner described above to
develop these. 
It is the responsibility of your local authority to implement its flood protection actions
agreed within the Local Flood Risk Management Plan. You can help your local authority to
manage flooding by not dumping material on the banks of a watercourse and by letting
them know if flood defences are tampered with.
During severe flooding, local authorities will work with the emergency services and
coordinate shelter for people evacuated from their homes.
The Lead Local Authority for the Findhorn, Nairn and Speyside Local Plan District is:
Moray Council
Other local authorities who are responsible authorities for the Findhorn, Nairn and Speyside
Local Plan District are:
Highland Council
Scottish Water
Scottish Water is a responsible authority for flood risk management and is working closely
with SEPA, local authorities and other responsible authorities to coordinate plans to manage
flood risk.
Scottish Water has the public drainage duty and is responsible for foul drainage and the
drainage of rainwater run-off from roofs and any paved ground surfaces from the boundary
of properties. Additionally, Scottish Water helps to protect homes from flooding caused by
sewers either overflowing or becoming blocked. Scottish Water is not responsible for private
pipework or guttering within the property boundary. 
National Park
The National Park Authorities for Cairngorms National Park, were designated as responsible
authorities for flood risk management purposes in 2013. Both have worked with SEPA, local
authorities and Scottish Water to help develop Flood Risk Management Strategies and Local
Flood Risk Management Plans. They also fulfil an important role in land use planning,
carrying out or granting permission for activities that can play a key role in managing and
reducing flood risk. 
Page 144

Page 145

ap 
Page 55 
Forestry Commission Scotland
Forestry Commission Scotland was designated in 2013 as a responsible authority for flood
risk management planning purposes and has engaged in the development of the Local Flood
Risk Management Plan. This reflects the widely held view that forestry can play a significant
role in managing flooding.
Other organisations
• The Scottish Government oversees the implementation of the Flood Risk Management
(Scotland) Act 2009 which requires the production of Flood Risk Management Strategies
and Local Flood Risk Management Plans. Scottish Ministers are responsible for setting
the policy framework for how organisations collectively manage flooding in Scotland.
• NatureScot has provided general and local advice in the development of this Flood Risk
Management Strategies. Flooding is seen as a natural process that can maintain the
features of interest at many designated sites, so NatureScot helps to ensure that any
changes to patterns of flooding do not adversely affect the environment. NatureScot
also provides advice on the impact of Flood Protection Schemes and other land use
development on designated sites and species.
• During the preparation of the first flood risk management plans Network Rail and
Transport Scotland have identified works to address flooding at a number of frequently
flooded sites. Further engagement is planned with SEPA and local authorities to identify
areas of future work. There is the opportunity for further works to be undertaken during
the first flood risk management planning cycle although locations for these works are
yet to be confirmed.
• Utility companies have undertaken site specific flood risk studies for their primary assets
and have management plans in place to mitigate the effects of flooding to their assets
and also minimise the impacts on customers.
• The Met Office provides a wide range of forecasts and weather warnings. SEPA and the
Met Office work together through the Scottish Flood Forecasting Service.
• The emergency services provide emergency relief when flooding occurs and can
coordinate evacuations. You should call the emergency services on 999 if you are
concerned about your safety or the safety of others and act immediately on any advice
provided.
• Historic Environment Scotland considers flooding as part of their regular site
assessments. As such, flooding is considered as one of the many factors which inform
the development and delivery of its management and maintenance programmes.
• The Scottish Flood Forum is a Scottish charitable organisation that provides support for
those who are affected by, or are at risk of, flooding. It provides flood advice,
information, awareness, education and training to individuals and communities to help
reduce the risk of flooding; in partnership with the local authority, provides support
during the recovery process following a flood incident and aims to support the
development of resilient communities.
Page 145

Page 146

ap 
Page 56 
Annex 3: Links to other plans, policies, strategies and legislative
requirements
S18 Schedule of Clearance and Repair
The table below provides details of how to access schedules of clearance and repair for each
local authority under Section 18 of the Flood Risk Management (Scotland) Act 2009:
Local Authority Method of public access to the S18 Schedule
Moray Council
Information available on request. Details available here
http://www.moray.gov.uk/moray_standard/page_92010.html
or for further information contact flooding@moray.gov.uk
Highland Council
Information available on request. Details available here
https://www.highland.gov.uk/info/1226/emergencies/81/flooding 
or for further information contact 01349 886601 
Page 146

Page 147

ap 
Page 57 
Annex 4: Supporting information
Sources of flooding described in this Plan
The Local Flood Risk Management Plan addresses the risk of flooding from rivers, the coast
and surface water. The risk of flooding from rivers is usually due to rainfall causing a river to
rise above bank level spreading out and inundating adjacent areas. Coastal flooding is where
the risk is from the sea. Sea levels can change in response to tidal cycles or atmospheric
conditions. Over the longer term sea levels and coastal flood risk may change due to climate
change. Surface water flooding happens when rainwater does not drain away through the
normal drainage systems or soak into the ground, but lies on or flows over the ground
instead.
There can be interactions between these sources of flooding, and the Actions set out in this
Plan take this into account.
The following aspects of flooding have not been incorporated into this Plan:
• Groundwater is generally a contributing factor to flooding rather than the primary
source. It is caused by water rising up from underlying rocks or flowing from springs.
• Reservoir breaches have been assessed under separate legislation (Reservoirs (Scotland)
Act 2011). Further information and maps can be found on SEPA’s website.
• The Flood Risk Management Act (Scotland) 2009 does not require SEPA or responsible
authorities to assess or manage coastal erosion. However, SEPA has included
consideration of erosion in the Flood Risk Management Strategies by identifying areas
that are likely to be susceptible to erosion and where erosion can exacerbate flood risk.
As part of considering where actions might deliver multiple benefits, SEPA has looked to
see where the focus of coastal flood risk management studies coincides with areas of
high susceptibility to coastal erosion. Subsequent detailed studies and scheme design
will need to consider how coastal erosion in these areas.
• Coastal flood modelling. The information on coastal flooding used to set objectives and
identify actions is based on SEPA modelling using simplified coastal processes and
flooding mechanisms at work during a storm. Wave overtopping cannot be accurately
modelled at a national scale due to the importance of local factors such as prevailing
wind conditions, the depth and profile of the near-shore sea bed or the influence of any
existing defences or management structures. As a result, coastal flood risk may be
underestimated in some areas. Conversely, in locations with wide and flat floodplains,
the modelling may overestimate flood risk. To address this, in a number of locations
where more detailed local models were available they have been incorporated into the
development of the Flood Risk Management Strategies. Where wave overtopping has
been specifically identified as a concern – but where no further detailed modelling is
available – particular compensation has been made in the selection of appropriate
actions to address coastal flood risk.  
Page 147

Page 148

ap 
Page 58 
Commonly used terms
Below are explanatory notes for commonly used terms in flood risk management. A glossary
of terms is also available. 
• Reference to flood risk. During the development of the Strategy and Plan, flood risk has
been assessed over a range of likelihoods. For consistency in reporting information,
unless otherwise stated, all references to properties or other receptors being ‘at risk of
flooding’ refer to a medium likelihood flood (up to a 1 in 200 chance of flooding in any
given year). By exception, references will be made to high or low risk flooding, which
should be taken to mean a 1 in 10 chance/likelihood or 1 in 1000 chance/likelihood of
flooding in any given year respectively.
Likelihood of
Flooding Return Period
Annual Exceedance Probability
(chance of event occurring in any one
year)
High  10 year 10%
Medium  200 year 0.5%
Low  1000 year 0.1%
• Annual Average Damages have been used to assess the potential economic impact of
flooding within an area. Depending on its size or severity each flood will cause a
different amount of damage to a given area. Annual Average Damages are the
theoretical average economic damages caused by flooding when considered over a very
long period of time. It does not mean that damage will occur every year: in many years
there will be no damages, in some year’s minor damages and in a few years major
damages may occur. 
High likelihood events, which occur more regularly, contribute proportionally more to
Annual Average Damages than rarer events. Annual Average Damages incorporate
economic damages to the following receptors: residential properties, non-residential
properties, vehicles, emergency services, agriculture and roads. They have been
calculated based on the principles set out in the Flood Hazard Research Centre Multi-
Coloured Handbook (2010).
Flood risk management planning process
Flood risk management in Scotland aims to manage flooding in a sustainable way.
Sustainable flood risk management considers where floods are likely to occur in the future
and takes action to reduce their impact without moving the problem elsewhere. It considers
all sources of flooding, whether from rivers, the sea or from surface water. It delivers actions
that will meet the needs of present and future generations whilst also protecting and
enhancing the environment.
The sustainable approach to managing flood risk works on a six year planning cycle,
progressing through the key stages outlined below. 
Page 148

Page 149

ap 
Page 59 
• Identifying priority areas at significant flood risk
The first step to delivering a risk based, sustainable and plan-led approach to flood risk
management was SEPA’s National Flood Risk Assessment, which was published in 2011. The
assessment considered the likelihood of flooding from rivers, groundwater and the sea, as
well as flooding caused when heavy rainfall is unable to enter drainage systems or the river
network. The likelihood of flooding was examined alongside the estimated impact on
people, the economy, cultural heritage and the environment. It significantly improved our
understanding of the causes and consequences of flooding, and identified areas most
vulnerable to floods.
• Potentially Vulnerable Areas and Local Plan Districts
Based on the National Flood Risk Assessment, SEPA identified areas where flooding was
considered to be nationally significant. These areas are based on catchment units as it is
within the context of the wider catchment that flooding can be best understood and
managed. These nationally significant catchments are referred to as Potentially Vulnerable
Areas. 
In Scotland, 243 Potentially Vulnerable Areas were identified. They are estimated to contain
92% of the total number of properties at risk. 
A small number of Candidate Potentially Vulnerable Areas were identified after the National
Flood Risk Assessment in light of new information that warranted further assessment and
appraisal. They are included in the flood risk management planning process. The National
Flood Risk Assessment will be updated to inform each subsequent planning cycle.
For flood risk management purposes, Scotland was divided into 14 Local Plan Districts. Each
Local Plan District will have a Flood Risk Management Strategy and a Local Flood Risk
Management Plan.
• Improving the understanding of flooding
SEPA developed flood hazard and flood risk maps between 2012 and 2014. These maps
improved the understanding of flooding and helped inform the subsequent selection of
actions to manage flood risk in Potentially Vulnerable Areas. The flood hazard maps show
information such as the extent of flooding, water level, as well as depth and velocity where
appropriate. The flood risk maps provide detail on the impacts on people, the economy,
cultural heritage and the environment.
In 2012 SEPA also developed an assessment of the potential for natural flood management.
The assessment produced the first national source of information on where natural flood
management actions would be most effective within Scotland. 
Flood hazard and flood risk maps and the assessment of the potential for natural flood
management can be viewed on the SEPA website www.sepa.org.uk.
• Identifying objectives and selecting actions
The objectives and actions to manage flooding will provide the long-term vision and practical
steps for delivering flood risk management in Scotland.
Page 149

Page 150

ap 
Page 60 
Working collaboratively with local partnerships, SEPA has agreed the objectives for
addressing the main flooding impacts. Actions that could deliver these agreed objectives
have been appraised for their costs and benefits to ensure the right combinations are
identified and prioritised. The actions considered in the development of this strategy include
structural actions (such as building floodwalls, restoring flood plains, or clearance and repair
works to rivers) and non-structural actions (such as flood warning, land use planning or
improving our emergency response). Structural and non-structural actions should be used
together to manage flood risk effectively. 
An assessment of the potential for natural flood management was used to help identify
opportunities for using the land and coast to slow down and store water. Natural flood
management actions were recommended in areas where they could contribute to the
management of flood risk. In such instances these actions were put forward as part of flood
protection or natural flood management studies.
• Lead local authority
The FRM Act requires a lead local authority to be identified for each Local Plan District. The
lead local authority is crucial to the successful implementation of the FRM Act and, as such,
must perform several important functions over and above the general duties and powers
given to local authorities elsewhere in the FRM Act. 
The lead local authority, having contributed with other local authorities to the production of
the Flood Risk Management Strategy, must prepare a Local Flood Risk Management Plan of
co-ordinated actions to reduce flood risk within the Local Plan District. Although the lead
local authority is responsible for the production of the plan, its content will be drawn from
and agreed by all local authorities, other responsible authorities and SEPA within the Local
Plan District. 
• Surface Water Management Plans
A Surface Water Management Plan (SWMP) is a best practice plan which outlines the
preferred surface water management strategy in a given location. In this context surface
water flooding describes flooding from sewers, drains, groundwater, and runoff from land,
small water courses and ditches that occurs as a result of heavy rainfall.
A SWMP study is undertaken in consultation with key local partners who are responsible for
surface water management and drainage in their area. Partners work together to
understand the causes and effects of surface water flooding and agree the most cost
effective way of managing surface water flood risk for the long term. The process of working
together as a partnership is designed to encourage the development of innovative solutions
and practices.
A SWMP should establish a long-term action plan to manage surface water in an area and
should influence future capital investment, drainage maintenance, public engagement and
understanding, land-use planning, emergency planning and future developments.
The UK Government SWMP guidance seeks to provide a simplified overarching framework,
which allows different organisations to work together and develop a shared understanding
of the most suitable solutions to surface water flooding problems. The SWMP guidance has
Page 150

Page 151

ap 
Page 61 
been written for local authorities to assist them as they co-ordinate and lead local flood risk
management activities.
• Integrated Catchment Studies
Integrated Catchment Studies (ICS) are led by Scottish Water in partnership with local
authorities and SEPA. These studies will improve knowledge and understanding of the
interactions between the above ground and below ground drainage network e.g. with the
sewer network, watercourses and (where appropriate) the sea. This will improve the
understanding of contributions these drainage networks play in local surface water flood
risk. 
Five ICS’s were undertaken in Scotland during SR10 (2010-2015), to Modelling and Flood Risk
Assessment stage, which have provided a fuller understanding of the sources and
mechanisms of flooding across these catchments. These studies are expected to undertake
an Pioneering phase between 2015-2021. This will identify the actions to reduce flood risk
across the catchments, with the outputs feeding into the Local Authority led Surface Water
Management Planning process. 
Fifteen ICS’s will begin in Scotland during SR15 (2015-2021). These studies will go through
the Scoping and Modelling phases, which culminates in defining the sources and
mechanisms of flooding in the catchment, and an understanding of the impacts of that
flooding. It is expected that the ICS partnerships will remain and it is anticipated that the
Optioneering phase for these studies will be initiated directly after the preceding phases.
• Natural flood management assessment and mapping of artificial and
natural features
The new approach to Flood Risk Management requires SEPA to consider whether techniques
that restore, enhance or alter natural features and characteristics can contribute to
managing flood risk. This means looking at the potential to work with natural hydrological
and morphological processes. 
Because the National Flood Risk Assessment provides only a strategic assessment of flood
risk, further refined assessments may be required in Potentially Vulnerable Areas, including
the mapping of artificial and natural features whose removal could increase flood risk. 
The development of catchment characteristics and methodologies, to assess the potential
for natural flood management, commenced in 2012 alongside work to identify natural flood
management actions, which could contribute to the management of flood risk. The
information was published in 2013. The assessment of natural flood management was a
consideration in the setting of objectives and actions in the Flood Risk Management
Strategies. In January 2016 SEPA published the Natural Flood Management Handbook to
provide practitioners with information on how best to implement natural flood management
measures.
• Flood hazard and flood risk maps
The production of flood hazard and flood risk maps has improved our understanding of
flooding and helped inform the selection of actions required to manage flood risk in
Potentially Vulnerable Areas. Work on production of these maps began in January 2012.
Page 151

Page 152

ap 
Page 62 
These maps show details of flood events for a range of probabilities and cover flooding from
rivers, the sea, sewers, surface water run-off and groundwater. 
A flood hazard map shows information that describes the nature of a flood, such as the
extent of flooding, water level, depth and velocity where appropriate. 
A flood risk map provides detail on the impacts on people, the economy, cultural heritage
and the environment. 
Further information regarding the development of the flood maps and providing a link to the
maps, is available online on the SEPA website here –
http://www.sepa.org.uk/environment/water/flooding/flood-maps/ 
Page 152

Page 153

ap 
Page 63 
Annex 5: Acknowledgments
The information described in this Annex relates to the Figures and Maps that have been
generated by SEPA as part of the Flood Risk Management Strategy and have been
reproduced in this Local Flood Risk Management Plan. The Findhorn, Nairn and Speyside
Local Plan District Partners gratefully acknowledge the cooperation and input that various
parties have provided, including inter alia, the following organisations:
SEPA
Local authorities acknowledge the inclusion of Figures, Maps and text generated by SEPA in
preparation of the Clyde and Loch Lomond Flood Risk Management Strategy. Figures and
Maps produced by SEPA for the Findhorn, Nairn and Speyside Flood Risk Management
Strategy have been reproduced in the Findhorn, Nairn and Speyside Local Flood Risk
Management Plan with authorisation from SEPA under SEPA Licence number 100016991
(2015).
Ordnance Survey
These reproduced maps are based upon Ordnance Survey material with the permission of
Ordnance Survey on behalf of the Controller of Her Majesty’s Stationery Office © Crown
Copyright. Any unauthorised reproduction infringes Crown copyright and may lead to
prosecution or civil proceedings. SEPA Licence number 100016991 (2015). Ordnance Survey
Licence number 100023422 (2012).
The Centre for Ecology and Hydrology 
Some features of these maps are based upon digital spatial data licensed from the Centre for
Ecology and Hydrology © NERC (CEH) and third party licensors.
The Met Office 
Data provided by The Met Office has been used under licence in some areas of flood risk
information production. ©Crown Copyright (2015), the Met Office
The James Hutton Institute 
Data provided under licence from the James Hutton Institute has been applied in production
of flood risk management information. Copyright © The James Hutton Institute and third
party licensors.
British Geological Survey 
Flood risk information has been derived from BGS digital data under licence. British
Geological Survey ©NERC
Local authorities 
Lead authorities acknowledge the provision of flood models and other supporting data and
information from local authorities and their collaboration in the production of flood risk
management information. 
Page 153

Page 154

ap 
Page 64 
Scottish Water 
Local authorities acknowledge the inclusion of surface water flooding data generated by
Scottish Water in preparation of flood risk information.
Page 154

Page 155

ap 
Page 65 
Glossary
Actions - Actions describe where and how flood risk will be managed. These actions have
been set by SEPA and agreed with flood risk management authorities following consultation.
Selection of actions to deliver the agreed objectives has been based on a detailed
assessment and comparison of economic, social and environmental criteria. The FRM Act
uses the term ‘measures’ rather than ‘actions’.
Annual Average Damages (AAD) - Depending on its size or severity, each flood will cause a
different amount of damage to a flood prone area and we can calculate the cost of this
damage. Annual Average Damages for an area are the average costs per year that would
occur from flooding over a very long period of time. Scottish figures have been calculated
based on the method set out in the Flood Hazard Research Centre’s Multi-Coloured
Handbook (2010).
Appraisal - Appraisal is the process of defining objectives, examining options and weighing
up the costs, benefits, risks and uncertainties before a decision is made. The FRM Strategy
appraisal method is designed to set objectives and identify the most sustainable
combination of actions to tackle flooding from rivers, sea and surface water.
Awareness Raising - Public awareness, participation and community support are essential
components of sustainable flood risk management. SEPA and the responsible authorities
have a duty to raise public awareness of flood risk. This is undertaken both individually and
collaboratively by a range of organisations. Improved awareness of flood risk and actions
that prepare individuals, homes and businesses for flooding can reduce the overall impact.
Benefit Cost Ratio (BCR) - A benefit cost ratio summarises the overall value for money of an
action or project. It is expressed as the ratio of benefits to costs (both expressed as present
value monetary values). A ratio of greater than 1:1 indicates that the economic benefits
associated with an action are greater than the economic costs of implementation; therefore
this is taken as the threshold of economic viability. It should be acknowledged that it is not
always possible to accurately estimate economic values for all elements of benefit, and BCR
is just one of a number of techniques used in appraisal.
Candidate Potentially Vulnerable Area – A small number of Candidate Potentially
Vulnerable Areas were identified after the National Flood Risk Assessment in light of new
information that warranted further assessment and appraisal. They are included in the flood
risk management planning process. The National Flood Risk Assessment will be updated to
inform each subsequent planning cycle.
Catchment – The area of land drained by a drainage system – either natural or piped.
Category (CAT) 1 and 2 Responders – As defined by the Civil Contingencies Act 2004.
Category 1 responders are ‘core’ responders: local authorities, police, fire and rescue
services, ambulance service, NHS health boards, SEPA and the Maritime and Coastguard
Agency. Category 2 responders are key co-operating responders in support of Category 1
responders. These include gas and electricity companies, rail and air transport operators,
harbour authorities, telecommunications providers, Scottish Water, the Health and Safety
Executive and NHS National Services Scotland.
Page 155

Page 156

ap 
Page 66 
Coastal Flooding – Flooding that results from sea level rise from a combination of high tides
and stormy conditions. The term coastal flooding is used under the Flood Risk Management
(Scotland) Act 2009, but in some areas it is also referred to as tidal flooding and covers areas
such as estuaries and river channels that are influenced by tidal flows.
Combined Sewer - Combined sewers transport foul sewage from homes and industry as well
as carrying surface water runoff from gutters, drains and some highways. Heavy or
prolonged rainfall can rapidly increase the flow in a combined sewer until the amount of
water exceeds sewer capacity.
Combined Sewer Overflow - Combined sewer overflows are purposely designed structures
to ensure any excess water from sewerage systems is discharged in a controlled way and at
a specific managed location.
Confluence - Where two or more rivers meet.
Conveyance - Conveyance is a measure of the carrying capacity of a watercourse. Increasing
conveyance enables flow to pass more rapidly and reducing conveyance slows flow down.
Both actions can be effective in managing flood risk depending on local conditions.
Cultural Heritage Site - Sites of particular cultural significance may be designated. The
highest level of designation is a World Heritage Site. Historic Environment Scotland
maintains lists of buildings of special architectural or historic interest; these buildings are
referred to as ‘listed buildings’.
Culvert - A pipe, channel or tunnel used for the conveyance of a watercourse or surface
drainage water under a road, railway, canal or other obstacle.
Damages - Flood damages are categorised as direct or indirect i.e. as a result of the flood
water itself, or subsequent knock on effects. Damage to buildings and contents caused by
flood water are an example of direct damages, whilst loss of industrial production, travel
disruption or stress and anxiety are indirect. Some damages can be quantified in monetary
terms, and others can only be described. The potential damages avoided by implementation
of a flood risk management action are commonly referred to as the benefits of that action.
When comparing the effectiveness of different actions, it is useful to consider estimated
damages and damages avoided across the lifespan of the action. Within the FRM Strategies,
a 100 year appraisal period has been used as standard. This allows costs, damages and
benefits across this time frame to be compared in present value terms. See also ‘Annual
Average Damages’.
Economic Impact - An assessment of the economic value of the positive and negative effects
of flooding and / or the actions taken to manage floods. 
Embankment – A flood embankment is an engineered earthfill structure designed to contain
high river levels or protect against coastal flooding. They are commonly grass-covered, but
may need additional protection against erosion by swiftly flowing water, waves or
overtopping.
Emergency Plans / Response - Emergency response plans are applicable for all types of
flooding. They set out the steps to be taken during flooding in order to maximise safety and
minimise impacts where possible. Under the Civil Contingencies Act, Category 1 Responders
Page 156

Page 157

ap 
Page 67 
have a duty to maintain emergency plans. Emergency plans may also be prepared by
individuals, businesses, organisations or communities.
Environmental Impact - A change in the environment as a result of an action or activity.
Impacts can be positive or negative and may vary in significance, scale and duration.
Environmental Impact Assessment (EIA) - A process which identifies the potential
environmental impacts, both negative and positive, of a proposal.
Estuary - A coastal body of water usually found where a river meets the sea; the part of the
river that is affected by tides.
Flood - In the terms of the FRM Act, ‘flood’ means a temporary covering by water, from any
source, of land not normally covered by water. This does not include a flood solely from a
sewerage system, as a result of normal weather or infrastructure drainage. A flood can cause
significant adverse impacts on people, property and the environment.
Flood Bund - A constructed retaining wall, embankment or dyke designed to protect against
flooding to a specified standard of protection. 
Flood defence - Infrastructure, such as flood walls, embankments or flood storage intended
to protect an area against flooding to a specified standard of protection.
Flood Extent - The area that has been affected by flooding, or is at risk of flooding from one
or more sources for a particular likelihood.
Flood Frequency - The probability that a particular size/severity of flood will occur in a given
year (see likelihood).
Flood Hazard - In terms of the FRM Act, hazard refers to the characteristics (extent, depth,
velocity) of a flood.
Flood Hazard Map - Flood hazard maps are required by the FRM Act to show information
that describes the nature of a flood in terms of the source, extent, water level or depth and,
where appropriate, velocity of water. Flood hazard and risk maps are referred to collectively
as flood maps and are available on the SEPA website.
Flood Prevention / Protection Scheme - A flood protection scheme, as defined by the FRM
Act, is a scheme by a local authority for the management of flood risk within the authority
area. This includes defence measures (flood prevention schemes) formerly promoted under
the Flood Prevention (Scotland) Act 1961.
Flood Protection Study - Flood protection studies aim to refine understanding of the hazard
and risk associated with flooding in a particular area, catchment or coastline. They will
involve detailed assessment of flood hazard and / or risk and may develop options for
managing flood risk.
Flood Protection Works - Flood protection works can include the same flood defence
measures that would make up a formal Flood Protection Scheme but without the legal
process, protections and requirements that would come by delivering the works as a
scheme.
Page 157

Page 158

ap 
Page 68 
Flood Risk - A measure of the combination of the likelihood of flooding occurring and the
associated impacts on people, the economy and the environment.
Flood Risk Assessment - Flood Risk Assessments are detailed studies of an area where flood
risk may be present. These are often used to inform planning decisions, may help to develop
flood schemes and have also contributed to the National Flood Risk Assessment.
Flood Risk Management Strategy - Sets out a long-term vision for the overall reduction of
flood risk. Contains a summary of flood risk in each Local Plan District, together with
information on catchment characteristics and a summary of objectives and actions for
Potentially Vulnerable Areas.
Flood Risk Management (Scotland) Act 2009 (FRM Act) - The flood risk management
legislation for Scotland. It transposes the EC Floods Directive into Scots Law and aims to
reduce the adverse consequences of flooding on communities, the environment, cultural
heritage and economic activity.
Flood Risk Management Cycle - Under the FRM Act flood risk management planning is
undertaken in six year cycles. The first planning cycle is 2015 – 2021. The first delivery cycle
is lagged by approximately 6 months and is from 2016 - 2022.
Flood Warning Scheme - A flood warning scheme is the network of monitoring on a coastal
stretch or river, which provides SEPA with the ability to issue Flood Warnings.
Floodplain - Area of land that borders a watercourse, an estuary or the sea, over which
water flows in time of flood, or would naturally flow but for the presence of flood defences
and other structures where they exist.
Floodplain Storage - Floodplains naturally store water during high flows. Storage can be
increased through natural or man-made features to increase flood depth or slow flows in
order to reduce flooding elsewhere.
Green (Blue-Green) Infrastructure - The European Commission defines green infrastructure
as “the use of ecosystems, green spaces and water in strategic land use planning to deliver
environmental and quality of life benefits. It includes parks, open spaces, playing fields,
woodlands, wetlands, road verges, allotments and private gardens. Green infrastructure can
contribute to climate change mitigation and adaptation, natural disaster risk mitigation,
protection against flooding and erosion as well as biodiversity conservation.”
Historic Environment Scotland - The new lead public body for the country’s historic
environment. It brings together Historic Scotland and the Royal Commission on the Ancient
and Historic Monuments of Scotland.
Habitats Regulations Appraisal - The Habitats Regulations require competent authorities to
assess certain plans or projects which affect Natura sites. Any development proposal, which
requires planning permission or other consent, is a 'project' which may require
consideration under the Habitats Regulations.
Land Use Planning – The process undertaken by public authorities to identify, evaluate and
decide on different options for the use of land, including consideration of long term
economic, social and environmental objectives and the implications for different
communities and interest groups.
Page 158

Page 159

ap 
Page 69 
Lead Local Authority - A local authority responsible for leading the production, consultation,
publication and review of a Local Flood Risk Management Plan.
Local Development Plan – A Local Development Plan (LDP) provides the vision for how
communities will grow and develop in the future. The intention is that they provide certainty
for communities and investors alike about where development should take place and where
it should not and the supporting infrastructure required for growth. A LDP is required for
each council area across Scotland.
Local Flood Risk Management Plan - Produced by lead local authorities, these will take
forward the objectives and actions set out in Flood Risk Management Strategies. They will
provide detail on the funding, timeline of delivery, arrangements and co-ordination of
actions at the local level during each six year FRM planning cycle.
Local Plan District - Geographical areas for the purposes of flood risk management planning.
There are 14 Local Plan Districts in Scotland.
Local Plan District Partnerships - Each Local Plan District has established a local partnership
comprised of local authorities, SEPA, Scottish Water and others as appropriate. These
partnerships are distinct from the FRM Local Advisory Groups and they retain clear
responsibility for delivery of the FRM actions set out in the Local Flood Risk Management
Plans. It is the local partnership that makes decisions and supports the delivery of these
plans.
Maintenance - Sections 18 and 59 of the Flood Risk Management (Scotland) Act 2009 put
duties of watercourse inspection, clearance and repair on local authorities. In addition, local
authorities may also be responsible for maintenance of existing flood protection schemes or
defences.
National Flood Risk Assessment (NFRA) - A national analysis of flood risk from all sources of
flooding which also considers climate change impacts. Completed in December 2011 this
provides the information required to undertake a strategic approach to flood management
that identifies areas at flood risk that require further appraisal. The NFRA will be reviewed
and updated for the second cycle of FRM Planning by December 2018.
Natural Flood Management - A set of flood management techniques that aim to work with
natural processes (or nature) to manage flood risk.
Non-Residential Properties - Properties that are not used for people to live in, such as shops
or other public, commercial or industrial buildings.
Potentially Vulnerable Area - Catchments identified as being at risk of flooding and where
the impact of flooding is sufficient to justify further assessment and appraisal. There were
243 Potentially Vulnerable Areas identified by SEPA in the National Flood Risk Assessment
and these will be the focus of the first FRM planning cycle.
Property Level Protection - Property level protection includes flood gates, sandbags and
other temporary barriers that can be used to prevent water from entering individual
properties during a flood.
Page 159

Page 160

ap 
Page 70 
Q&S - Quality and Standards (Q&S) is the process, governing costs and outputs, through
which the planning and delivery of improvements by Scottish Water to the public drinking
water and sewerage services in Scotland is carried out.
Receptor - Refers to the entity that may be impacted by flooding (a person, property,
infrastructure or habitat). The vulnerability of a receptor can be reduced by increasing its
resilience to flooding.
Residual Risk - The risk that remains after risk management and mitigation. This may include
risk due to very severe (above design standard) storms or risks from unforeseen hazards.
Resilience - The ability of an individual, community or system to recover from flooding.
Responsible Authority - Designated under the FRM (Scotland) Act 2009 and associated
legislation as local authorities, Scottish Water and, from 21 December 2013, the National
Park Authorities and Forestry Commission Scotland. Responsible authorities, along with
SEPA and Scottish Ministers, have specific duties in relation to their flood risk related
functions.
Return Period - A measure of the rarity of a flood event. It is the statistical average length of
time separating flood events of a similar size.
River Basin Management Planning (RBMP) - The Water Environment and Water Services
(Scotland) Act 2003 transposed the European Water Framework Directive into Scots law. The
Act created the River Basin Management Planning process to achieve environmental
improvements to protect and improve our water environment. It also provided the
framework for regulations to control the negative impacts of all activities likely to have an
impact on the water environment.
Runoff Reduction - Actions within a catchment or sub-catchment to reduce the amount of
runoff during rainfall events. This can include intercepting rainfall, storing water, diverting
flows or encouraging infiltration.
Scottish Advisory and Implementation Forum for Flooding (SAIFF) - The stakeholder forum
on flooding set up by the Scottish Government to ensure legislative and policy aims are met
and to provide a platform for sharing expertise and developing common aspirations and
approaches to reducing the impact of flooding on Scotland’s communities, environment,
cultural heritage and economy.
Scottish Flood Forecasting Service - SEPA operates a network of over 250 rainfall, river and
coastal monitoring stations throughout Scotland that generate data 24 hours a day. The
Scottish Flood Forecasting Service is a joint initiative between SEPA and the Met Office that
produces daily, national flood guidance statements which are issued to Category 1 and 2
Responders. The flood guidance statements provide an assessment of the risk of flooding for
a five day period allowing responders time to put preparations in place to reduce the impact
of flooding.  The service also provides information which allows SEPA to issue flood
warnings, giving people a better chance of reducing the impact of flooding on their home or
business. For more information please visit SEPA’s website.
Page 160

Page 161

ap 
Page 71 
Self Help - Self help actions can be undertaken by any individuals, businesses, organisations
or communities at risk of flooding. They are applicable to all sources, frequency and scales of
flooding. They focus on awareness raising and understanding of flood risk.
Site Protection Plans - Site protection plans are developed to identify whether normal
operation of a facility can be maintained during a flood. This may be due to existing
protection or resilience of the facility or the network.
Site of Special Scientific Interest - Sites protected by law under the Nature Conservation
(Scotland) Act 2004 to conserve their plants, animals and habitats, rocks and landforms.
Special Area of Conservation (SAC) - Strictly protected site designated under the European
Habitats Directive. The Directive requires the establishment of a European network of
protected areas which are internationally important for threatened habitats and species.
Strategic Environmental Assessment - A process for the early identification and assessment
of the likely significant environmental effects, positive and negative, of activities. Often
considered before actions are approved or adopted.
Strategic Flood Risk Assessment (SFRA) - A Strategic Flood Risk Assessment is designed for
the purposes of specifically informing the Development Plan Process. A SFRA involves the
collection, analysis and presentation of all existing and readily available flood risk
information (from any source) for the area of interest. It constitutes a strategic overview of
flood risk.
Standard of protection (SoP) - All flood protection structures are designed to be effective up
to a specified flood likelihood (Standard of Protection). For events beyond this standard,
flooding will occur. The chosen Standard of Protection will determine the required defence
height and / or capacity.
Surface Water Management Plan (SWMP) - A plan that takes an integrated approach to
drainage accounting for all aspects of urban drainage systems and produces long term and
sustainable actions. The aim is to ensure that during a flood the flows created can be
managed in a way that will cause minimum harm to people, buildings, the environment and
business.
Surface Water Plan / Study - The management of flooding from surface water sewers,
drains, small watercourses and ditches that occurs, primarily in urban areas, during heavy
rainfall. FRM Strategy actions in this category include: Surface Water Management Plans,
Integrated Catchment Studies and assessment of flood risk from sewerage systems (FRM Act
Section 16) by Scottish Water. These have been selected as appropriate for each Potentially
Vulnerable Area.
Sustainable Drainage Systems (SuDS) - A set of techniques designed to slow the flow of
water. They can contribute to reducing flood risk by absorbing some of the initial rainfall and
then releasing it gradually, thereby reducing the flood peak and helping to mitigate
downstream problems. SuDS encourage us to take account of quality, quantity and amenity
/ biodiversity.
Sustainable Flood Risk Management - The sustainable flood risk management approach
aims to meet human needs, whilst preserving the environment so that these needs can be
Page 161

Page 162

ap 
Page 72 
met not only in the present, but also for future generations. The delivery of sustainable
development is generally recognised to reconcile three pillars of sustainability –
environmental, social and economic.
Surface Water Flooding - Flooding that occurs when rainwater does not drain away through
the normal drainage systems or soak into the ground, but lies on or flows over the ground
instead.
Vulnerability - A measure of how likely someone or something is to suffer long-term damage
as a result of flooding. It is a combination of the likelihood of suffering harm or damage
during a flood and the ability to recover following a flood (resilience). 
Page 162

Page 163

Published by Moray Council October 2022
Local Flood Risk
Management Plan
FINDHORN, NAIRN AND SPEYSIDE
Cycle 2
Item 6
Page 163

Page 164

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
2
PUBLIC
Contents
1 Flood Risk Management in Findhorn, Nairn and Speyside Local Plan District ................ 4
1.1 What is a flood risk management plan? .................................................................. 4
1.2 Managing flooding in Scotland ................................................................................ 6
1.2.1 Progress in cycle 1: 2016-2022 ........................................................................ 6
1.3 How the flood risk management plans were developed .......................................... 7
1.3.1 Partnership working ......................................................................................... 7
1.3.2 Roles and responsibilities for flood risk management ....................................... 8
1.3.3 Consultation, engagement and advice ........................................................... 11
1.3.4 Consultation Report ....................................................................................... 12
1.4 Links with other plans and policies ........................................................................ 14
1.4.1 River basin management planning ................................................................. 14
1.4.2 Land use and spatial planning ....................................................................... 14
1.4.3 Emergency planning and response ................................................................ 15
1.4.4 Scottish Water investment plans .................................................................... 15
1.4.5 Duty to assess bodies of water and schedule clearance and repair works ..... 15
1.5 Next steps and monitoring progress ...................................................................... 17
1.5.1 Funding review for future Local flood risk management actions ..................... 17
1.5.2 Licensing acknowledgements ........................................................................ 18
2 Flood Risk Management in Findhorn, Nairn and Speyside Local Plan District .............. 19
2.1 Local Flood Risk Management Plans 2022 – 2028 ............................................... 19
2.2 Actions across the Local Plan District ................................................................... 21
2.3 Potentially Vulnerable Areas ................................................................................. 29
2.4 LPD 5 Findhorn, Nairn and Speyside – List of PVAs ............................................. 30
2.4.1 02/05/01 (Burghead to Lossiemouth) ............................................................. 31
2.4.2 02/05/02 (Spynie) .......................................................................................... 38
2.4.3 02/05/03 (Lhanbryde) ..................................................................................... 44
2.4.4 02/05/04 (Kingston & Garmouth).................................................................... 48
2.4.5 02/05/05 (Elgin) ............................................................................................. 54
2.4.6 02/05/06 (Forres) ........................................................................................... 59
2.4.7 02/05/07 (Dallas) ........................................................................................... 64
2.4.8 02/05/08 (Nairn) ............................................................................................. 68
Page 164

Page 165

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
3
PUBLIC
2.4.9 02/05/09 (Rothes & Aberlour) ........................................................................ 76
2.4.10 02/05/10 (Aviemore) ...................................................................................... 86
2.4.11 02/05/11 (Kingussie) ...................................................................................... 90
2.4.12 02/05/12 (Newtonmore) ................................................................................. 94
2.4.13 02/05/13 (Dalwhinnie) .................................................................................... 99
2.4.14 02/05/14 (Kinloss) ........................................................................................ 102
2.4.15 02/05/15 (Nethy Bridge) ............................................................................... 107
3 Next Steps ................................................................................................................. 112
3.1 Next Steps and Monitoring Progress ................................................................... 112
4 Annexes ..................................................................................................................... 113
4.1 LPD Roles & Responsibilities .............................................................................. 113
4.2 Links to Schedules of Clearance and Repair ....................................................... 117
4.3 Land Use Planning.............................................................................................. 118
4.4 Supporting Information ........................................................................................ 120
4.5 Acknowledgements ............................................................................................. 125 
Page 165

Page 166

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
4
PUBLIC
1 Flood Risk Management in Findhorn,
Nairn and Speyside Local Plan
District  
1.1 What is a flood risk management plan?
Flood Risk Management Plans are required under the Flood Risk Management
(Scotland) Act 2009 and are updated every 6 years. 
Flood Risk Management Plans are Scotland’s route map for reducing the effects of
flooding on our communities. This is key to health, well-being and economic
success. They are also important in our response to the climate emergency as
flooding is increasing due to climate change. 
The Local Flood Risk Management Plan (the Plan) for the Findhorn, Nairn and
Speyside Local Plan District has been designed to ensure effort to reduce flood risk
in this catchment area is coordinated. This is achieved by working in partnership with
all organisations responsible for flood risk management and the plan focuses the
work of these organisations to where the risk of flooding and benefits of action are
greatest. The roles and responsibilities of some of the key organisations involved are
set out later in the plan.
The Plan sets out how and when actions to reduce the impact of flooding in the
Findhorn, Nairn and Speyside Local Plan District (LPD) identified in the National
Flood Risk Management Plan will be delivered. The Plan identifies where the risk of
flooding and benefit of investment is greatest and says how and when actions will be
delivered. Flood Risk Management Plans are delivered over six-year cycles.  This
plan is for Cycle 2 and will be delivered between 2022 and 2028.
The content of the Plan has been produced by Moray Council as the Lead Local
Authority for this LPD, in agreement with the designated Responsible Authorities,
that are listed below.. 
Page 166

Page 167

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
5
PUBLIC
• The Highland Council;
• Scottish Water;
• SEPA; 
• Forestry Commission Scotland; and 
• Cairngorms National Park Authority 
This plan replaces the flood risk management plan for Cycle 1, which was published
in 2016. 
High Springtide at Lossiemouth 2019  
Page 167

Page 168

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
6
PUBLIC
1.2 Managing flooding in Findhorn, Nairn and Speyside LPD 
Flooding needs to be managed sustainably so that flood risk is reduced without
moving the problem elsewhere. It must be done in a way that contributes to the
health and wellbeing of communities, supports the protection and regeneration of the
environment, improves resilience to climate change and enables a sustainable
economy. Actions are needed on all sources of flooding – including from rivers, the
sea, surface water and groundwater – to meet the needs of present and future
generations while also protecting and enhancing the environment. 
Using a 6 year planning cycle enables new data, improved techniques and
developing knowledge and understanding to be incorporated regularly into the Flood
Risk Management approach. Using all the latest information to regularly review our
assessment of flood risk forms the foundation of a risk-based, plan-led approach to
managing flooding sustainably. We have outlined below the key stages of the flood
risk management process. 
1.2.1 Progress in cycle 1: 2016-2022
The 2016 local flood risk management plan outlined the long term objectives to
tackle flooding in the areas at highest risk within Findhorn, Nairn and Speyside. 
The objectives for each area were agreed and actions were developed to meet these
objectives. Actions to reduce flood risk included developing flood studies and flood
protection schemes and providing public flood warnings and alerts. Actions to avoid
flooding included maintenance of flood defences and storage areas and producing
strong planning policies, which prevent development from taking place in flood risk
areas. 
In 2019 Moray Council published the interim report for the Findhorn, Nairn and
Speyside LPD. This report gave the status of each action at that time and reported
them as red, amber or green:
• Red: The action is running late or over budget and is unlikely to meet its aims. 
• Amber: The action is running late or over budget but is still likely to meet its
aims. 
Page 168

Page 169

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
7
PUBLIC
• Green: The action is complete or is on track to meet its aims.
Actions with a green or amber status can be expected to succeed in working towards
their objectives. The final report was published December 2022.  These reports are
published here. http://www.moray.gov.uk/downloads/file124908.pdf
1.3 How the flood risk management plans were developed
1.3.1 Partnership working
Many organisations and individuals are involved in flood risk management in
Scotland. The causes and effects of flooding are complex, and issues cross the
boundaries of neighbouring authorities as well as the responsibilities of different
organisations. To be successful, flood risk management needs coordination, as set
out in the flood risk management plans. Collaboration by those responsible for flood
management is essential along with a commitment to work in partnership with the
other organisations and stakeholders who can contribute to the sustainable
management of flooding. Partnership working is at the heart of the Plan and will be
central to delivery of the objectives and actions set out.
Strong relationships between these organisations were developed through the first
cycle of The Plan. Working with these organisations has allowed us to gather local
knowledge, expertise and experience from the actions delivered in the first cycle, to
inform development of the new plans. The roles and responsibilities of some of the
organisations with formal flood risk management responsibilities are set out below.
There are a wide range of other stakeholders involved in flood risk management.
Some work directly with Responsible Authorities through the local partnerships and
advisory groups. Others, by virtue of their interests and activities, deliver direct action
which can benefit flood risk management. Through the lifetime of the Plan, we will
seek to strengthen existing partnerships and establish new ones to achieve the best
outcomes for flood risk management. 
Page 169

Page 170

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
8
PUBLIC
1.3.2 Roles and responsibilities for flood risk management
Individuals have a personal responsibility to protect themselves and their property
from flooding. However, public bodies have responsibilities too and are working
together to reduce the impacts of flooding in Scotland. Some of the key roles are
outlined below and more information is available from the Moray Council website. 
Your responsibilities  
It is your responsibility to manage your own flood risk and protect yourself, your
family, property or business. There are steps you can take now to be flood prepared
and reduce the damage and disruption flooding can have on your life.
• View SEPA’s flood maps to check if your area is affected by flooding
https://map.sepa.org.uk/floodmaps
• Sign up to Floodline to receive messages when flooding is forecast in your
area https://www.floodlinescotland.org.uk/
• Know who to contact if flooding happens
https://www.sepa.org.uk/media/28952/who_to_contact_2014.pdf
Other useful tools and advice on how to be prepared are available on SEPA’s
Floodline website and on the Scottish Flood Forum website.
a) Local authorities and Lead Local Authorities   
Local authorities are responsible for working together to produce Scotland’s local
flood risk management plans and work in partnership with SEPA, Scottish Water and
other responsible authorities to develop these.
It is the responsibility of local authorities to implement action to manage flooding and
maintain flood defences. Local authorities also inspect, clear and repair
watercourses to reduce flood risk and routinely maintain road gullies on public roads
and highways.
During severe flooding, local authorities will work with the emergency services and
co-ordinate shelter for people evacuated from their homes. 
Page 170

Page 171

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
9
PUBLIC
b) SEPA 
SEPA is Scotland’s national flood forecasting, flood warning and strategic flood risk
management authority. SEPA works in partnership with the Met Office to forecast
flooding and operate Floodline to warn the public and emergency responders when
flooding is likely. SEPA produces Scotland’s flood risk management plans, working
closely with other organisations responsible for managing flood risk to ensure that a
nationally consistent approach to flood risk management is adopted. SEPA also
provides flood risk advice on land use planning when requested and raises
awareness of flooding at a national level through education initiatives, community
engagement and campaigns. 
c) Scottish Water  
Scottish Water is a responsible authority for flood risk management and is working
closely with SEPA, local authorities and others to coordinate plans to manage flood
risk. Scottish Water has the public drainage duty and is responsible for draining
wastewater from properties and businesses, and rainwater run-off from roofs and
paved areas within the boundary of properties. Pipework and guttering within the
boundary, are the responsibility of the property owner. 
Scottish Water helps to protect homes from flooding caused by sewers either
overflowing or becoming blocked. This is done in a way that is fair and consistent to
customers across the country, with sewer flooding investment prioritised to provide
the biggest benefit for customers and the environment first. Currently investment to
reduce the risk of sewer flooding is prioritised towards properties that have
experienced internal sewer flooding and are at the highest risk of repeat occurrence
of sewer flooding during frequent rainfall events.
d) National parks  
The National Park Authorities, Loch Lomond & Trossachs National Park and
Cairngorms National Park, work with SEPA and other responsible authorities to
develop the flood risk management plans and local flood risk management plans.
They also fulfil a key role in land use planning, carrying out and permitting activities
that can help manage and reduce flood risk. 
Page 171

Page 172

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
10
PUBLIC
e) Other organisations  
The Scottish Government oversees the implementation of the Flood Risk
Management (Scotland) Act 2009, which requires the production of flood risk
management plans and local flood risk management plans. Scottish Ministers are
responsible for setting the policy framework for how organisations collectively
manage flooding in Scotland. 
Scottish Forestry and Forestry and Land Scotland took over the roles of Forestry
Commission Scotland in 2018 when the Forestry and Land Management (Scotland)
Act 2018 came into force. While these executive agencies of Scottish Government
are not formally designated as a responsible authority under the Flood Risk
Management (Scotland) Act 2009, they support Scottish Government in delivering its
flood risk related duties. This includes engaging in the development of the flood risk
management plans through national and local advisory groups, Local Plan District
partnerships, and collaborative projects. This reflects the widely held view that
forestry can play a significant role in managing flooding.
The Met Office provides a wide range of forecasts and weather warnings. SEPA and
the Met Office work together through the Scottish Flood Forecasting Service,
combining SEPA’s hydrological expertise with the Met Office’s meteorological data to
predict the likelihood and timing of river, coastal and surface water flooding.
The emergency services provide emergency relief when flooding occurs and can
coordinate evacuations. You should call the emergency services on 999 if you are
concerned about your safety or the safety of others and act immediately on any
advice provided.
The Scottish Flood Forum aims to reduce the impacts of flooding by providing
immediate support and by establishing a network of community resilience groups in
flood risk areas, to equip communities to cope with flooding.  
Page 172

Page 173

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
11
PUBLIC
1.3.3 Consultation, engagement and advice
Further to the strong partnership approach to flood risk management planning in
Scotland, it is essential to work with the people and communities that experience and
live with the threat of flooding. This ensures that our assessment of the risk is
accurate. How flooding is managed should support the communities at risk and effort
needs to be targeted to where most can be achieved. Public consultations have
been held, jointly with SEPA, during the development of the Plan. 
The most recent consultation ran from July 2021 to October 2021 nd covered
information on the objectives and actions planned for each target area within the
Findhorn, Nairn and Speyside LPD. The consultation was advertised widely by both
Moray Council and SEPA . A summary of the consultation is provided in section
1.3.4.
Moray Council submitted a Strategic Environmental Assessment (SEA) Screening
Report to the SEA Gateway. The SEA Gateway advised that a Strategic
Environmental Assessment was not required for the Plan. 
A Habitats Regulations Appraisal (HRA) has been undertaken for the National Flood
Risk Management Plan that has informed the Plan. Where the HRA identified
mitigation measures to protect the nature interests, these have been incorporated
into the Plan, this only includes actions identified in the National Flood Risk
Management Plan. Studies included in the National Flood Risk Management Plan
and the Plan may recommend schemes or works that will be the subject of future
plans and full assessment would be undertaken as part of the development process.
Where studies identify actions likely to have significant effects on qualifying interests
of nature sites an appropriate assessment will be required. Where it cannot be
shown that there will be no adverse effect on site integrity, proposals will be refused. 
Page 173

Page 174

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
12
PUBLIC
1.3.4 Consultation Report
A joint consultation was undertaken for both the National and Local Flood Risk
Management Plans between 31 July and 31 October 2021. A total of 18 replies were
received for the Findhorn, Nairn and Speyside LPD area. The responses received
were split across the following representatives:- 
There were 3 key areas highlighted in the majority of the responses received, details
of which are provided below. 
• Land use planning and the possibility of a large housing development taking
place in Nairn and the Impacts that this development will have on flood risk
due to surface water flooding.  As part of the Plan Highland Council will
continue to ensure that planning applications will be dealt with in line
with the current guidlines and polices
• Surface water flooding in Forres and the plans which moray council intend to
undertaken with particular reference to Bank Lane. Moray Council during
this cycle will complete a Surface Water Management Plan. If actions
from th plan propose a solution, funding for this solution will be looked
for in Cycle 3 of the flood risk management planning process.
Page 174

Page 175

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
13
PUBLIC
• Surface water flooding within Elgin. Moray Council has developed a
Surface Water Management Plan for Elgin. Actions from this plan have
been forward for national prioritisation by Scottish Government and
subject to resources and funding a surface water scheme will be
progressed within Elgin.
•  
Surface Water Flooding in Elgin 
Page 175

Page 176

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
14
PUBLIC
1.4 Links with other plans and policies
1.4.1 River basin management planning  
River basin management aims to protect and improve the condition of Scotland’s
rivers, lochs, estuaries, coastal waters and groundwater. Taking action to reduce
flood risk in Scotland provides opportunities to deliver joint objectives for restoration
and flood risk management. Coordination between river basin management and
flood risk management can reduce flood risk, while also improving water quality and
biodiversity. SEPA is leading the delivery of both the river basin management plan
and the flood risk management plans so has worked to ensure that there is
integration and coordination between them. This coordination, particularly in regard
to consultation and engagement, is important for stakeholders who have an interest
in the objectives of both plans. 
1.4.2 Land use and spatial planning  
Land use planning decisions are pivotal to achieving sustainable flood risk
management.  Flood risk management can have significant implications for the
location of development and similarly the location of development can have an
impact on flood risk. Actions that deliver national land use planning policies are
summarised in Annex 3.
The Moray Council develops and adopts a new Local Development Plan every five
years.  It sets out the Council’s strategy for delivering appropriate development in
Moray, considering a number of potential constraints, including flooding. The current
plan was adopted in July 2020.
Periodically The Highland Council will review and update its Local Development
Plans. These plans set out the strategy for delivering appropriate development within
each area and take into account a number of constraints, including flooding. The
current Highland-wide Local Development Plan was adopted in 2012, a review of this
plan has begun and consultation on the Main Issues Report (carried out by The
Highland Council) concluded in January 2016. The new plan was published in the
summer of 2016 and adopted in winter 2017. The new Highland-wide plan has taken
into account of the flood risk and the actions proposed in this Plan.
Page 176

Page 177

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
15
PUBLIC
The Inner Moray Firth Local Development Plan is the part of the Highland wide
development plan relevant to this Plan. 
1.4.3 Emergency planning and response  
Emergency planning and response is undertaken by Category 1 and 2 responders
including Police Scotland, the Scottish Fire and Rescue Service, the Scottish
Ambulance Service, both local authorities, the NHS, the Met Office and SEPA.
Emergency plans are prepared under the Civil Contingencies Act 2004. The Moray
Council produces it Emergancy plans, while the Highland Council is a member of the
Highlands and Islands Local Resilience Partnership. These partnerships coordinate
the emergency response to flood events, such as road closures, evacuations and
temporary accommodation.
1.4.4 Scottish Water investment plans  
There is a close relationship between Local Flood Risk Management Plans and
Scottish Water’s 25 year strategic plan. Sewer flooding is not considered in detail in
the Flood Risk Management Plans as it remains a high priority for Scottish Water
and its customers. Scottish Water’s close involvement in flood risk management
planning aims to ensure that there is strong coordination between the management
of sewer flooding and wider surface water flood risk, and the actions to be taken
forward by local authorities and others. 
1.4.5 Duty to assess bodies of water and schedule clearance and repair works 
The duty to assess bodies of water and schedule clearance and repair works lies
with Moray Council and The Highland Council.
Moray Council has a risk-based approach to assessing bodies of water that may give
rise to flooding. Where potential flood risk has been identified the relevant water
body has been included in the Council’s routine inspection schedule. The frequency
of inspection is dependent on the assessed risk, any works identified during these
inspections are included in the Council’s schedule of clearance and repair. The
Moray Council’s schedule of clearance and repair works is published online at:
www.moray.gov.uk/flooding
Page 177

Page 178

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
16
PUBLIC      
Example of Clearance and Repair works
The Highland Council has implemented a plan-led, risk-based approach to assessing
bodies of water that may give rise to flooding and has documented over 500
watercourses and 2,000 related structures throughout the Highland Council area. A
full-time watercourse inspector is employed to assess routinely the risk of flooding
from each structure (e.g. a culvert inlet or screen). Should any routine clearance
work be required that cannot be carried out at the time of inspection, the work
required substantially to reduce the risk of flooding is entered in a schedule of
clearance and repair works and made available for public inspection. The Highland
Council’s schedule of clearance and repair works is published online at:
http://www.highland.gov.uk/info/1210/environment/81/flooding/5
Page 178

Page 179

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
17
PUBLIC
1.5 Next steps and monitoring progress 
Moray Council and the other responsible authorities are committed to continue to
work together, improving the understanding and response to flooding and managing
flood risk for the good of Scotland through this and subsequent planning cycles. 
Progress will be monitored throughout the years covered by this plan through
ongoing joint working arrangements under the Local Plan District partnerships. Lead
local authorities will provide an interim report on the progress of delivering all actions
in the local flood risk management plans not earlier than 2 years and not later than 3
years from its publication. A final report will also be prepared at the end of the
second planning cycle. A third set of flood risk management plans and local flood
risk management plans will be published in 2027/2028. 
1.5.1 Funding review for future Local flood risk management actions 
The distribution of Scottish Government grant funding for actions in the plan for the
period 2022 – 2028 is currently being considered by a flood risk management
working group1. This group will put forward options and recommendations to Scottish
Ministers and COSLA, through the Settlement and Distribution Group, for
consideration. A decision will not be made in time for the publication of this plan. As
such it should be noted that it may not be possible for all actions identified in the
Plan to be grant funded. Inclusion of an action in this plan does not formally commit
a Council to implement it, if reasons arise which make any actions undeliverable,
including inability to secure adequate funding. 
This plan remains the best understanding of the objectives and actions required over
the long term to manage flood risk in the identified high risk areas within this LPD.
The delivery of the Plan, particularly the ambitions on how quickly actions can be
delivered, may have to be adapted to reflect wider developments in public funding, 
1 Membership of the group includes representatives from Scottish Government, the Convention of Scottish Local
Authorities (COSLA), local authorities, Society of Chief Officers of Transportation in Scotland (SCOTS) flood risk
management group and SEPA. 
Page 179

Page 180

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
18
PUBLIC
the ability of responsible authorities to access funding from other sources, pandemic
recovery, and other national priorities. 
1.5.2 Licensing acknowledgements  
Full data licensing acknowledgements can be found in Annex 5 of this plan.
INSERT HIGHLAND PICTURE IS WE GET ONE
Page 180

Page 181

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
19
PUBLIC
2 Flood Risk Management in Findhorn,
Nairn and Speyside Local Plan
District  
2.1 Local Flood Risk Management Plans 2022 – 2028 
The Findhorn, Nairn and Speyside Local Plan District covers an area of around
4,800km² and has a population of approximately 100,000 people. It includes the low-
lying coastal areas around Nairn and Lossiemouth in the north and the steeper, more
rugged landscape of the Cairngorms National Park in the south. 
The area is largely rural with the main land cover including heather grassland, bog,
coniferous woodland and agricultural land. The main rivers are the River Spey, the
River Findhorn and the River Nairn. The coastline is approximately 70km long and
includes rocky shorelines and extensive beaches. 
There is river, surface water and coastal flood risk in the Local Plan District, with the
main risk coming from river and surface water flooding. The area has been affected
by several large floods. In December 2012 a storm led to coastal flooding in
Lossiemouth and Kingston and in August 2014 ex-hurricane Bertha caused
widespread river flooding with Elgin and Dallas particularly affected. 
Currently it is estimated that there are 11,000 people and 7,300 homes and
businesses at risk from flooding. This is estimated to increase to 15,000 people and
9,900 homes and businesses by the 2080s due to climate change. The annual cost
of flooding is approximately £8.2 million. Note however that flooding from wave
overtopping is not fully represented in the assessment of flood risk and the impact of
coastal flooding may be underestimated.  
The Plan is led by Moray Council, Other responsible authorities include The
Highland Council, Cairngorms National Park Authority, SEPA, Forestry and Land
Scotland and Scottish Water. 
They are supported by Scottish Government agencies including Transport Scotland. 
Page 181

Page 182

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
20
PUBLIC
Within this Local Plan District, actions are regularly carried out by Responsible
Authorities to help prepare communities for potential flooding and reduce the impact
of any flooding that does occur.  
Page 182

Page 183

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
21
PUBLIC
2.2 Actions across the Local Plan District 
Responsible authorities carry out actions in all areas of the LPD which help to
manage current and future flooding. These actions help to ensure that key aspects of
flood risk management are taken forward in all locations. They ensure that for
example new housing developments occur in the right places, and that critical flood
risk information is developed and updated for all areas. The following actions are due
to take place over the next 6 years, and most of these are carried out on an ongoing
basis. 
Awareness raising
Action SEPA, the Responsible Authorities and other organisations such as
the Scottish Flood Forum work together through national and local
initiatives to help communities understand the risk of flooding and
what actions individuals can take. Improved awareness of flood risk
and actions that prepare individuals, homes and businesses for
flooding can reduce the overall impact of flooding. 
Local authorities will undertake additional awareness raising
activities when developing any specific project proposals and will
engage with community resilience groups and local communities. 
Scottish Flood Forum support flood risk communities by raising
community awareness, promoting self-help, developing community
groups and establish a recovery support programme after a flood. 
Page 183

Page 184

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
22
PUBLIC 
Data to support climate resilience
Action As Scotland’s hydrometric authority, SEPA operates a network of
stations to measure river level, flow, rainfall, sea level, loch and
groundwater level. The data goes into a long term data archive and is
critical to underpin all flood risk management activities including flood
warning, flood mapping, design of flood protection and sustainable
development as well as supporting a range of regulatory and
recreational uses. 
SEPA will continue to maintain and develop its hydrometric network,
contribute to UK and international data archives, and improve and
update the datasets used for flood frequency analysis. 
SEPA will support research and development of data, methods and
guidance to improve the evidence on which decisions can be made,
and to enable the impact of climate change to be included in all flood
risk management activities. 
Emergency plans
Action Many organisations, including local authorities, the emergency
services and SEPA provide an emergency response to flooding.
Emergency plans are prepared and maintained under the Civil
Contingencies Act 2004 by Category 1 and 2 Responders and are
coordinated through regional and local resilience partnerships, often
supported by voluntary organisations. They set out the steps to be
taken to maximise safety and minimise impacts during flooding.
Emergency plans may also be prepared by individuals, businesses,
organisations or communities. Scottish Water is a Category 2
responder under the Civil Contingencies Act 2004 and will support
regional and local resilience partnerships as required.
Page 184

Page 185

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
23
PUBLIC 
Flood forecasting
Action The Scottish Flood Forecasting Service is a partnership between
SEPA and the Met Office. The service continues to produce a daily,
national flood guidance statement, issued to emergency
responders, local authorities, and other organisations with flood risk
management duties. As the flood warning authority for Scotland
SEPA continues to provide its flood warning service issuing flood
alerts and warnings when required, giving people a better chance of
reducing the impact of flooding on their home or business. 
Flood warning development framework
Action SEPA has published a new flood warning development framework
for 2022 – 2028, which will detail its ambitions and strategic actions
to maintain and improve its flood warning service across Scotland.
SEPA will continue to develop the Scottish Flood Forecast, a 3 day
forecast of flood risk across Scotland and bring together all live
information such as flood warnings, river levels and rainfall data into
a central hub easily accessible for the public.
Working in close partnership with the Met Office through the
Scottish Flood Forecasting Service, SEPA will develop its capability
in surface water flooding forecasting, focusing initially on the
transport sector to support climate-ready infrastructure. SEPA will
also undertake a prioritised improvement programme of existing
river and coastal flood warning schemes to provide more accurate
forecast with improved lead time. 
Page 185

Page 186

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
24
PUBLIC 
Future flood risk management planning
Action The years covered by the lifetime of this plan are crucial. Radical
progress is needed in how we reduce our impact on the climate and
respond to the effects of climate change. How we plan to manage
flooding to our communities is on the front line of the challenges of
this decade. The 2028 flood risk management plans will be more
ambitious than ever before. 
We have plan for a better future by publishing our flooding services
strategy in 2022 with a clear and measurable delivery plan. We will
put greener, fairer communities at the heart of our ambitions. 
SEPA has set its own target to be a regenerative organisation by
2030 and the next set of plans will further this ambition. 
During this plan cycle, SEPA will work to develop new partnerships
with a wider range of stakeholders, including businesses and
commercial sectors. We will investigate alternative sources of
finance to tackle flooding and drive forward practical options for
adaptation. 
Guidance development
Action The Scottish Government and SEPA have developed and updated
guidance to inform flood risk management projects. This guidance
has be produced in 2022 and will look at how best to adapt to the
long-term impacts of climate change and the most appropriate
methods of assessing the benefits of flood risk management actions. 
Technical guidance to support flood risk management partners will
be reviewed and updated by SEPA where required. 
Page 186

Page 187

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
25
PUBLIC
Scottish Forestry, in collaboration with its UK counterparts, will
produce guidance on designing and managing forests to reduce
flood risk.
Guidance will be developed to help local authorities understand the
requirements for mapping relevant bodies of water and sustainable
urban drainage systems in their areas.
Hazard mapping updates
Action An understanding of flooding is essential to develop a plan led risk-
based approach to flood risk management. SEPA will continue to
update their national hazard mapping, which shows the likelihood of
flooding in Scotland from different flooding sources:
https://www.sepa.org.uk/environment/water/flooding/flood-maps/.
SEPA will continue to develop the hazard mapping viewer to make it
easier for the public, partners and stakeholders to access data on
the likelihood of flooding.
Land use planning
Action Local authorities, SEPA and Scottish Water all have a responsibility
under the Flood Risk Management (Scotland) Act 2009 to support
sustainable flood risk management through the land use planning
process. National planning policies set out the Scottish Ministers’
priorities for the development and use of land. Under this approach,
new development in areas with medium to high likelihood of flooding
should generally be avoided. 
Current national planning policies aim to restrict development within
the floodplain and limit exposure of new receptors to flood risk,
promote flood reduction via natural and structural flood
management measures and restoration of natural features, and
Page 187

Page 188

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
26
PUBLIC
avoid increased surface water flooding through sustainable drainage
and the minimisation of impermeable surfaces. 
Locally determined planning policies place further requirements
within their area of operation to restrict inappropriate development
and prevent unacceptable risk. 
Maintenance
Action Local authorities have a duty to assess bodies of water and to carry
out clearance and repair works where such works would
substantially reduce flood risk. 
Local authorities are also responsible for the drainage of roads. In
addition, local authorities may also be responsible for maintenance
of any existing flood protection schemes or works. 
Scottish Water will continue to undertake risk-based inspection,
maintenance and repair on the public sewer network. 
Asset owners and riparian landowners are responsible for the
maintenance and management of their own assets including those
which help to reduce flood risk. 
Natural flood management mapping
Action SEPA will continue to support activities that improve our
understanding of how to effectively target and deliver natural flood
management. As part of this, SEPA will review and update the
opportunities mapping for natural flood management. This will
include linking blue-green infrastructure with the surrounding natural
catchment and coastline. Natural flood management seeks to store
or slow down flood waters through measures such as the planting of
Page 188

Page 189

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
27
PUBLIC
woodlands, wetland creation, river restoration, or the creation of
intertidal habitats. 
In addition to flooding benefits, natural flood management measures
can also provide many additional benefits to biodiversity, water
quality, recreation, and carbon storage. 
National flood risk assessment
Action Understanding the future impacts of climate change remains a
central theme of SEPA’s flood risk management activity. SEPA will
use the latest UK information on climate change to support an
improved understanding of the changes in flood risk across the 21st
century. SEPA will use the most suitable data to develop the
national flood risk assessment (NFRA) 2024. This assessment will
be used to identify future Potentially Vulnerable Areas. 
National surface water mapping
Action The national flood risk assessment 2018 identified that surface
water flooding has the potential to impact more properties in
Scotland than any other source of flooding. Over the next 6 year
cycle SEPA will look to vastly improve its national understanding of
surface flood risk by undertaking a wholescale update of the
national surface water maps to reflect developments in data and
understanding, including the impact of climate change. 
Reservoirs
Action SEPA will continue to develop its assessment of flood risk from dam
failure and use these assessments to direct a proportionate
regulatory approach to ensure reservoir safety.  Over the next
management cycle we will implement further developments of our
flood warning capabilities in the unlikely event of reservoir failure.
Page 189

Page 190

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
28
PUBLIC
Scottish Flood Defence Asset Database
Action The Scottish Flood Defence Asset Database provides information on
existing flood protection schemes. National data on flood protection
infrastructure is needed to understand flood risk and to develop
adaptation planning for Scotland. SEPA will continue to host SFDAD
and look for opportunities to support the development of our
understanding of how and when Scotland’s flood defence assets
should be adapted to continue to maintain protection from flooding in
the future.
Self help
Action Everyone is responsible for protecting themselves and their property
from flooding. People can take steps to reduce damage and
disruption to their homes and businesses should flooding happen.
This includes preparing a flood plan and flood kit, installing property
flood resilience measures, signing up to Floodline, engaging with
their local flood group, and ensuring that properties and businesses
are insured against flood damage. The following places offer help
with taking steps to protect yourself:
https://www.floodre.co.uk/
https://www.biba.org.uk/current-issues/flood-insurance/
https://floodlinescotland.org.uk/
https://scottishfloodforum.org/
Responsible authorities will continue to develop the understanding
of flood risk to communities and promote measures to help
individuals and businesses to reduce their risk.
More specific local actions to manage flood risk in target areas are detailed in the
Potentially Vulnerable Areas (PVAs) sections below. 
Page 190

Page 191

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
29
PUBLIC
2.3 Potentially Vulnerable Areas
Potentially Vulnerable Areas (PVAs) were designated in 2018 based on the potential
current or future risk from all sources of flooding. This designation was informed by
the national flood risk assessment (available to view at:
https://www.sepa.org.uk/data-visualisation/nfra2018/). 
As part of continued analysis of flood risk, the national flood risk assessment and
Potentially Vulnerable Areas (PVAs) will be reviewed every 6 years to take on board
any new information. There are 15 Potentially Vulnerable Areas (PVAs) in this Local
Plan District. Following sections provide more information on these areas.  
Figure 1. Potentially vulnerable areas in Findhorn, Nairn and Speyside Local
Plan District 
Page 191

Page 192

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
30
PUBLIC
2.4 LPD 5 Findhorn, Nairn and Speyside – List of PVAs 
Click the blue text to select your area of interest 
PVA Ref PVA Name Local authority area Page number
02/05/01 Burghead to Lossiemouth Moray 31
02/05/02 Spynie Moray 38
02/05/03 Lhanbryde Moray 43
02/05/04 Kingston and Garmouth Moray 47
02/05/05 Elgin Moray 53
02/05/06 Forres Moray 58
02/05/07 Dallas Moray 44
02/05/08 Nairn Highland 67
02/05/09 Rothes and Aberlour Moray 75
02/05/10 Aviemore Highland 85
02/05/11 Kingussie Highland 89
02/05/12 Newtonmore Highland 93
02/05/13 Dalwhinnie Highland 98
02/05/14 Kinloss Moray 101
02/05/15 Nethy Bridge Highland 106
Page 192

Page 193

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
31
PUBLIC
2.4.1 02/05/01 (Burghead to Lossiemouth)
This area is designated as a Potentially Vulnerable Area due to the risk of surface
water flooding to Hopeman and the risk of coastal flooding to Lossiemouth. Both
areas have a history of flooding. 
There are 2 target areas in this Potentially Vulnerable Area, which have been the
focus of further assessment, these are listed below. Further information on the
objectives and actions to manage flood risk within this area is provided below.  
List of target areas    
Hopeman (target area 389)
Lossiemouth (target area 391)
Page 193

Page 194

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
32
PUBLIC
Local Flood Risk Management plan datasheet
2.4.1.1 Hopeman 389  
Summary Location Map
Hopeman is located along the
southern shore of the Moray Firth
and is within the Moray Council
area. The main source of flooding in
the area is surface water flooding.
There are approximately 180 people
and 110 homes and businesses
currently at risk from flooding. This
is likely to increase to 240 people
and 150 homes and businesses by
the 2080s due to climate change. 
What is the Current understanding of Flood risk
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national level assessments of flooding from rivers, surface water and
coastal sources, and this national assessment has highlighted the risk of surface
water flooding in this target area. Hopeman has therefore been identified as a new
target area for the 2021 flood risk management plans. The national assessment is
improved for surface water flooding by the development of private works to reduce
the risk of surface water flooding in the Hopeman area. Heavy rainfall is known to
run off the steep surrounding hills overwhelming the local drainage systems. There
are frequent records of surface water flooding in Hopeman, including floods during
August and October 2014. 
Page 194

Page 195

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
33
PUBLIC
Objective ID Description
Avoid flood risk 3891 Avoid inappropriate development that increases
flood risk in Hopeman
Avoid flood risk 3892 Avoid an increase in flood risk by the appropriate
management and maintenance of flood
protection works at Hopeman
Improve data and
understanding
3893 Improve data and understanding of the
performance of the flood protection asset in
Hopeman
Prepare for flooding 3894 Prepare for current flood risk and future flooding
as a result of climate change in Hopeman 
Action ID  Hopeman 38901
Action Type Flood defence maintenance
Action Delivery
Lead
Moray Council Indicative Delivery 2026-28
Description Continue to maintain the flood protection works at Hopeman.
The scheme is to be maintained by the current landowner.  
Funding Not Applicable
Coordination Moray Council will continue to liaise with the Land owner to
ensure the works are maintenance in accordance with the
maintenance schedule 
Page 195

Page 196

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
34
PUBLIC
Action ID  Hopeman 38902
Action Type Sewer flood risk assessment
Action Delivery
Lead
Moray Council Indicative Delivery 2026-28
Description Scottish Water will carry out an assessment of sewer flood
risk within the highest priority sewer catchments, which
includes Lossiemouth sewer catchment in this target area.
This will help to improve knowledge and understanding of
potential surface water flood risk. Funding for this action is
secured through Scottish Water's strategic planning
commitments.  
Funding Funding for this action is secure within Scottish Water’s
business plan.
Coordination The action delivery lead is Scottish Water in coordination with
the local authority and SEPA. 
Action ID  Hopeman 38903
Action Type Flood warning maintenance
Action Delivery
Lead
Moray Council Indicative Delivery 2026-28
Description SEPA should maintain the Moray Firth coastal flood warning
scheme.  
Funding SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Coordination SEPA will continue to raise awareness of flood warning, and
engage with communities about the service when required. 
Page 196

Page 197

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
35
PUBLIC
Local Flood Risk Management plan datasheet
2.4.1.2 Lossiemouth 391  
Summary Location Map
Lossiemouth is located on the southern
shore of the Moray Firth south and is
within the Moray Council area. The
main source of flooding in Lossiemouth
is coastal flooding. There are
approximately 140 people and 90
homes and businesses currently at risk
from flooding. This is estimated to
increase to 200 people and 130 homes
and businesses by the 2080s due to
climate change. 
What is the Current understanding of Flood risk
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national level assessments of flooding from rivers, surface water and
coastal sources. The national level assessment is improved for coastal flooding by
the development and operation of the Moray Firth flood warning scheme. There is
a long history of coastal flooding in Lossiemouth. 
The Dynamic Coast project has shown that parts of the shoreline in or adjacent to
this target area are subject to erosion at present or are considered likely to erode
in the future. Consideration should be given to how erosion might impact flood risk.
Any actions taken should aim to support building natural resilience to flooding and
not lead to an increase in erosion. 
Page 197

Page 198

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
36
PUBLIC
Objective ID Description
Avoid flood risk 3911 Avoid inappropriate development that increases
flood risk in Lossiemouth
Prepare for flooding 3912 Prepare for current flood risk and future flooding
as a result of climate change in Lossiemouth
Reduce flood risk 3913 Reduce the risk of coastal flooding to
Lossiemouth 
Action ID  Lossiemouth 39101
Action Type Sewer flood risk assessment
Action Delivery
Lead
Scottish Water Indicative Delivery 2025-2027
Description Scottish Water will undertake a modelling assessment in the
Lossiemouth sewer catchment to improve knowledge and
understanding of flood risk in this area as required under
Section 16 of the Flood Risk Management (Scotland) Act
2009
Funding Funding for this action is secured within Scottish Water's
business plan
Coordination Outputs of this modelling assessment will be shared with
local authorities and SEPA  
Page 198

Page 199

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
37
PUBLIC
Action ID Lossiemouth 39102
Action Type Strategic mapping improvements
Action Delivery
Lead
SEPA Indicative Delivery 2023-2024
Description SEPA has undertaken improved coastal modelling in this
target area including taking account of the impact of waves
on coastal flooding. We will complete and publish the
outcomes of this modelling work to inform decision making
with respect to flooding at the coast.
Funding SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authority on the potential to
coordinate the flood map update with any other actions being
carried out to understand or reduce coastal flooding.  
Action ID Lossiemouth 39103
Action Type Flood warning maintenance
Action Delivery
Lead
SEPA Indicative Delivery Ongoing 
Description SEPA will maintain the Moray Firth coastal flood warning
scheme.
Funding SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authorities on the potential to
use information from any flood studies around the Moray Firth
coast to inform ongoing flood warning. SEPA will continue to
raise awareness of flood warning, and engage with
communities about the service when required. 
Page 199

Page 200

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
38
PUBLIC
2.4.2 02/05/02 (Spynie)
This area is designated as a Potentially Vulnerable Area due to the risk of coastal
flooding to the Seatown area of Lossiemouth. There is a history of flooding in the
area, recently caused by combined coastal and river flooding. 
There is 1 target area in this Potentially Vulnerable Area, which has been the focus
of further assessment, this is identified below. Further information on the objectives
and actions to manage flood risk within this area is provided below. 
List of target areas
Seatown, Lossiemouth (target area 9991) 
Page 200

Page 201

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
39
PUBLIC
Local Flood Risk Management plan datasheet
2.4.2.1 Seatown, Lossiemouth 9991  
Summary Location Map
Seatown is an area of Lossiemouth,
facing onto the River Lossie estuary, in
the Moray Council area. The main
source of flooding in Seatown is coastal
flooding. There are approximately 390
people and 200 homes and businesses
currently at risk of flooding. This is likely
to increase to 490 people and 250
homes and businesses by the 2080s
due to climate change. 
What is the Current understanding of Flood risk
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national level assessments of flooding from rivers, surface water and
coastal sources. The national level assessment is improved for coastal flooding by
the Lossiemouth Coastal Flood Study. There are records of coastal flooding in the
Seatown area of Lossiemouth including floods in December 2012. 
The Dynamic Coast project has shown that parts of the shoreline in or adjacent to
this target area are subject to erosion at present or are considered likely to erode
in the future. Consideration should be given to how erosion might impact flood risk.
Any actions taken should aim to support building natural resilience to flooding and
not lead to an increase in erosion.   
Page 201

Page 202

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
40
PUBLIC
Objective ID Description
Avoid flood risk 99911 Avoid inappropriate development that increases
flood risk in the Seatown area of Lossiemouth
Prepare for flooding 99912 Prepare for current flood risk and future flooding
as a result of climate change in the Seatown
area of Lossiemouth
Reduce flood risk 99913 Reduce the risk of coastal flooding to the
Seatown area of Lossiemouth 
Action ID  Seatown, Lossiemouth 999101
Action Type Flood scheme or works design
Action Delivery
Lead
Moray Council Indicative Delivery 2026-2028
Description Further development of the preferred option will be required
prior to commencing with the detailed design. This is to
address current and future flood risk. The need for an
adaptation plan should also be assessed.
Moray Council proposes this action as the best viable option
for managing flood risk in this community. The delivery of this
action is subject to capital funding being made available by
Scottish Government. 
In accordance with the flood risk management plan, as part of
the scheme or works, the responsible authority should aim to
ensure the action will not have an adverse effect on the
integrity of the Moray Firth Special Area of Conservation and
Special Protection Area, and the Lower River Spey - Spey
Bay Special Area of Conservation.
Funding This works is subject to funding via the Scottish Government
flood capital monies. This funding has not been allocated at
the time of the production of this report.
Coordination The action delivery lead is Moray Council in coordination with
otherRresponsible Authorities including community
engagement  
Page 202

Page 203

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
41
PUBLIC
Action ID  Seatown, Lossiemouth 999102
Action Type Flood scheme or works implementation
Action Delivery
Lead
Moray Council Indicative Delivery 2026-2028
Description Progress the Seatown Flood Protection Scheme based on
the detailed design. As built drawings should be made
available to SEPA, for consideration in the Scottish Flood
Defence Asset Database, flood map improvements and flood
warning scheme updates.
Moray Council proposes this action as the best viable option
for managing flood risk in this community. The delivery of this
action is subject to capital funding being made available.
Funding This works is subject to funding via the Scottish Government
flood capital monies. This funding has not been allocated at
the time of the production of this report.
Coordination The action delivery lead is Moray Council in coordination with
other Responsible Authorities including community
engagement  
Action ID  Seatown, Lossiemouth 999103
Action Type Community engagement
Action Delivery
Lead
Moray Council Indicative Delivery 2025-2028
Description The responsible authorities to continue to engage with the
community, with particular focus on the detailed design of the
flood protection scheme, and building community resilience
Funding Moray Council Revenue
Coordination Moray will coordinate with Responsible Authorities to ensure
that communities are aware of the risk and resilient to the risk
of flooding  
Page 203

Page 204

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
42
PUBLIC  
Action ID  Seatown, Lossiemouth 999104
Action Type Sewer flood risk assessment
Action Delivery
Lead
Scottish Water Indicative Delivery 2027-2028
Description Scottish Water will undertake a modelling assessment in the
Lossiemouth sewer catchment to improve knowledge and
understanding of flood risk in this area as required under
Section 16 of the Flood Risk Management (Scotland) Act
2009
Funding Funding for this action is secured within Scottish Water's
business plan
Coordination Outputs of this modelling assessment will be shared with
local authorities and SEPA  
Action ID  Seatown, Lossiemouth 999105
Action Type Flood warning maintenance
Action Delivery
Lead
SEPA Indicative Delivery Ongoing
Description SEPA should maintain the Moray Firth coastal flood warning
scheme.
Funding SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authorities on the potential to
use information from any flood studies around the Moray Firth
coast to inform ongoing flood warning. SEPA will continue to
raise awareness of flood warning, and engage with
communities about the service when required  
Page 204

Page 205

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
43
PUBLIC
Action ID  Seatown, Lossiemouth 999106
Action Type Strategic mapping improvements
Action Delivery
Lead
SEPA Indicative Delivery 0
Description SEPA has undertaken improved coastal modelling in this
target area including taking account of the impact of waves
on coastal flooding. We will complete and publish the
outcomes of this modelling work to inform decision making
with respect to flooding at the coast.
Funding SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authority on the potential to
coordinate the flood map update with any other actions being
carried out to understand or reduce coastal flooding. 
INSERT WAVE OVERTOPPING PIC 
Page 205

Page 206

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
44
PUBLIC
2.4.3 02/05/03 (Lhanbryde)
This area is designated as a Potentially Vulnerable Area due to the risk of river
flooding in Lhanbryde. This has been reduced by the Lhanbryde Flood Alleviation
Scheme and incidents of flooding have been infrequent since its completion. 
There is one target area in this Potentially Vulnerable Area, which has been the
focus of further assessment, this is identified below. Further information on the
objectives and actions to manage flood risk within this area is provided below. 
List of target areas 
Lhanbryde (target area 390)
Page 206

Page 207

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
45
PUBLIC
Local Flood Risk Management plan datasheet
2.4.3.1 Lhanbryde 390  
Summary Location Map
Lhanbryde is located east of Elgin in the
Moray Council area. The national
assessment estimates that there are
approximately 180 people and 100
homes and businesses at risk from
flooding. The Lhanbryde Flood
Protection Scheme benefits an
estimated 30 homes and 5 businesses
up to a 1 in 100 year standard of
protection. The number of people,
homes and businesses at risk is
expected to increase by approximately
10% by the 2080s due to climate
change. 
What is the Current understanding of Flood risk
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national level assessments of flooding from rivers, surface water and
coastal sources. The national level assessment is underpinned for river flooding by
the design of the Lhanbryde Flood Protection Scheme (2005) and is improved for
surface water flooding by a sewer flood risk assessment. There were frequent
records of flooding prior to completion of the flood scheme including notable floods
in 1997. Since completion, surface water flooding has been recorded, and there
are also records of floods in nearby areas not protected by the scheme. 
Page 207

Page 208

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
46
PUBLIC
Objective ID Description
Avoid flood risk 3901 Avoid an increase in flood risk by the appropriate
management and maintenance of the Lhanbryde
Flood Alleviation Scheme
Avoid flood risk 3902 Avoid inappropriate development that increases
flood risk in Lhanbryde
Improve data and
understanding
3903 Improve data and understanding of the
performance of the Lhanbryde Flood Alleviation
Scheme
Prepare for flooding 3904 Prepare for current flood risk and future flooding as
a result of climate change in Lhanbryde 
Action ID  Lhanbryde 39001
Action Type Flood defence maintenance
Action Delivery
Lead
Moray Council Indicative Delivery Ongoing
Description The Lhanbryde Flood Alleviation Scheme will be maintained
as per the design requirements in order to continue to reliably
provide the appropriate level of protection.
Funding Moray Council Revenue
Coordination Moray Council will continue to maintain the scheme liaising
with Responsible Authorities and the community on issues
that may arise  
Page 208

Page 209

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
47
PUBLIC
Action ID  Lhanbryde 39002
Action Type Flood study (existing flood defences)
Action Delivery
Lead
Moray Council Indicative Delivery 2022-2023
Description Assess the performance of the Lhanbryde Flood Alleviation
Scheme. This is because our understanding of hydrology and
climate change has improved since the construction of the
scheme in 2005. The need for an adaptation plan will be
evaluated. The impact of the sediment trap on the channel
will be assessed as part of this.
Funding Moray Council Revenue
Coordination Moray Council will coordinate with Consultants and
landowners to deliver this work  
Action ID  Lhanbryde 39003
Action Type Sewer flood risk assessment
Action Delivery
Lead
Scottish Water Indicative Delivery 2025-2027
Description Scottish Water will undertake a modelling 
assessment in the Lossiemouth sewer catchment to improve
knowledge and understanding of flood risk in this area as
required under Section 16 of the Flood Risk Management
(Scotland) Act 2009
Funding Funding for this action is secured within Scottish Water's
business plan
Coordination Outputs of this modelling assessment will be shared with
local authorities and SEPA   
Page 209

Page 210

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
48
PUBLIC
2.4.4 02/05/04 (Kingston & Garmouth)
This area is designated as a Potentially Vulnerable Area due to the risk of coastal
flooding to Kingston and the risk of river flooding to Garmouth. Sea level rise as a
result of climate change is expected to increase the risk of flooding. Recent flooding
has been caused by river and coastal flooding. 
There are 2 target areas in this Potentially Vulnerable Area, which have been the
focus of further assessment, these are listed below. Further information on the
objectives and actions to manage flood risk within this area is provided below. 
List of target areas 
Kingston (target area 463)
Garmouth (target area 393)
Page 210

Page 211

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
49
PUBLIC
Local Flood Risk Management plan datasheet
2.4.4.1 Kingston 463  
Summary Location Map
Kingston is located on the Moray Firth
by the west bank of the River Spey as it
flows into Spey Bay. It is in the Moray
Council area. The main source of
flooding in Kingston is coastal flooding.
The area is particularly vulnerable to
erosion and the River mouth shifts
periodically. There are approximately 30
people and 20 homes and businesses
currently at risk of flooding. Based on a
local assessment, this may be
overestimated. This is likely to increase
to 70 people and 40 homes and
businesses by the 2080's due to climate
change. 
What is the Current understanding of Flood risk
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national level assessments of flooding from rivers, surface water and
coastal sources. The national level assessment is improved for coastal flood risk
by the Moray Firth flood warning scheme. The understanding of flood risk is also
being improved by monitoring of the shingle bank in front of Kingston. There are
frequent records of coastal flooding. The access roads are often affected, resulting
in Kingston being cut off from the surrounding area. 
Objective ID Description
Avoid flood risk 4631 Avoid inappropriate development that increases
flood risk in Kingston
Prepare for flooding 4632 Prepare for current flood risk and future flooding
as a result of climate change in Kingston 
Page 211

Page 212

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
50
PUBLIC
Action ID  Kingston 46301
Action Type Data collection
Action Delivery
Lead
Moray Council Indicative Delivery Ongoing
Description The shingle bank in front of Kingston should be monitored in
line with the study recommendations. Once the bank is within
25m of the landline, the actions outlined in the adaptation
plan (to be developed) should be implemented.
Funding Moray Council Revenue
Coordination Moray Council will continue to take yearly survey in spring.  
Action ID  Kingston 46302
Action Type Adaptation plan
Action Delivery
Lead
Moray Council Indicative Delivery 2022-2023
Description Climate change is expected to cause rising sea levels and
changes to storm patterns. This could lead to flooding
happening more often and changes to erosion. It is important
to plan for this and ensure future risk to communities and
infrastructure is managed appropriately. An adaptation plan
will be developed in conjunction with community engagement
and the monitoring strategy for the shingle bank. The plan
should consider the current and future flood risk to receptors
and assets and consider how they can be modified to
manage the flood risk or removed from the flood risk register.
Funding Moray Council Capital Funds
Coordination The action delivery lead is The Moray Council and will work
with Responsible Authorities /communities to deliver the
appropriate outcomes  
Page 212

Page 213

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
51
PUBLIC
Action ID  Kingston 46303
Action Type Flood warning maintenance
Action Delivery
Lead
SEPA Indicative Delivery Ongoing 
Description SEPA should maintain the River Spey and the Moray Firth
coastal flood warning schemes.
Funding SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authorities on the potential to
use information from any flood studies in the Spey catchment
to inform ongoing flood warning. SEPA will continue to raise
awareness of flood warning, and engage with communities
about the service when required 
Page 213

Page 214

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
52
PUBLIC
Local Flood Risk Management plan datasheet
2.4.4.2 Garmouth 393  
Summary Location Map
Garmouth is located near the mouth of
the River Spey within in the Moray
Council area. The main source of
flooding in Garmouth is the River Spey.
There is also a risk of surface water and
coastal flooding. Combined river and
coastal flooding may also be an issue.
There are approximately 80 people and
50 homes and businesses currently at
risk from flooding. A local assessment
indicates that this may be over-
estimated. This is estimated to increase
to 90 people and 60 homes and
businesses by the 2080s due to climate
change. 
What is the Current understanding of Flood risk
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national level assessments of flooding from rivers, surface water and
coastal sources. The national level assessment is improved by studies and
inspections carried out by Moray Council. Understanding of both river and coastal
flooding is improved by the development and operation of the Moray Firth and the
River Spey flood warning schemes. The understanding of surface water flooding is
improved by a sewer flood risk assessment. There are frequent records of flooding
in Garmouth. 
Objective ID Description
Avoid flood risk 3931 Avoid inappropriate development that increases
flood risk in Garmouth
Prepare for flooding 3932 Prepare for current flood risk and future flooding
as a result of climate change in Garmouth 
Page 214

Page 215

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
53
PUBLIC
Action ID  Garmouth 39301
Action Type Adaptation plan
Action Delivery
Lead
Moray Council Indicative Delivery 2024-2026
Description An adaptation plan will be developed in conjunction with
community engagement. The plan will consider the current
and future flood risk to receptors and assets and consider
how they can be modified to manage the flood risk or
removed from the flood risk register.
Funding Moray Council Revenue Fund
Coordination The action delivery lead is The Moray Council and will work
with Responsible Authorities /communities to deliver the
appropriate outcomes  
Action ID  Garmouth 39302
Action Type Flood warning maintenance
Action Delivery
Lead
SEPA Indicative Delivery Ongoing
Description SEPA will maintain the River Spey and the Moray Firth
coastal flood warning schemes.
Funding SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authorities on the potential to
use information from any flood studies in the Spey catchment
to inform ongoing flood warning. SEPA will continue to raise
awareness of flood warning, and engage with communities
about the service when required.  
Page 215

Page 216

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
54
PUBLIC
2.4.5 02/05/05 (Elgin)
Elgin is designated as a Potentially Vulnerable Area due to the risk of river and
surface water flooding. The Elgin Flood Protection Scheme benefits over 800
properties. Recent flooding occurred in August 2019 as a result of surface water
flooding. 
There is one target area in this Potentially Vulnerable Area, which has been the
focus of further assessment, this is identified below. Further information on the
objectives and actions to manage flood risk within this area is provided below. 
List of target areas 
Elgin (target area 392)
Page 216

Page 217

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
55
PUBLIC
Local Flood Risk Management plan datasheet
2.4.5.1 Elgin 392  
Summary Location Map
Elgin is located in the north of Scotland
on the banks of the River Lossie in the
Moray Council area. The main sources
of flooding in Elgin are river and surface
water flooding. There are approximately
1,200 people and 780 homes and
businesses currently at risk from
flooding. This is likely to increase to
3,400 people and 2,000 homes and
businesses by the 2080s due to climate
change. 
What is the Current understanding of Flood risk
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national level assessments of flooding from rivers, surface water and
coastal sources. The national level assessment is improved for flooding from the
River Lossie due to the development of the Elgin Flood Alleviation Scheme and
the River Lossie flood warning scheme. The understanding of surface water flood
risk is improved by the Moray Surface Water Management Plan. There is a long
history of river flooding in the Elgin target area including notable floods prior to the
construction of the flood scheme in July 1997 and in November 2002. There are
also records of surface water flooding, including recent flash floods in August
2019. 
Page 217

Page 218

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
56
PUBLIC
Objective ID Description
Avoid flood risk 3921 Avoid an increase in flood risk by the appropriate
management and maintenance of the Elgin Flood
Protection Scheme
Avoid flood risk 3922 Avoid inappropriate development that increases
flood risk in Elgin
Improve data and
understanding
3923 Improve data and understanding of the
performance of the flood protection assets in
Elgin
Prepare for flooding 3924 Prepare for current flood risk and future flooding
as a result of climate change in Elgin
Reduce flood risk 3935 Reduce the risk of surface water flooding in Elgin 
Action ID  Elgin 39201
Action Type Flood defence maintenance
Action Delivery
Lead
Moray Council Indicative Delivery Ongoing
Description Continue to maintain the Elgin Flood Alleviation Scheme. 
Funding Moray Council Revenue
Coordination Moray Council will continue to maintain the scheme liaising
with Responsible Authorities  and the community on issues
that may arise  
Page 218

Page 219

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
57
PUBLIC
Action ID  Elgin 39202
Action Type Flood study (existing flood defences)
Action Delivery
Lead
Moray Council Indicative Delivery 2022-2023
Description Assess the performance of the Elgin Flood Alleviation
Scheme. This is because new climate change data has
become available since the construction of the scheme. The
need for an adaptation plan will be evaluated.
Funding Moray Council Revenue
Coordination Moray Council will coordinate with Consultants and
landowners to deliver this work  
Action ID  Elgin 39203
Action Type Flood scheme or works design
Action Delivery
Lead
Moray Council Indicative Delivery 2026-2028
Description Works are proposed to address flood risk from surface water
in Elgin. Further work may be required to determine business
case prior to progressing to detailed design. The detailed
design for the flood works identified in the Surface Water
Management Plan will be progressed. Proposals could
include development of new overland flood paths, installation
of non-return valves and road re-profiling. 
The delivery of this action is subject to capital funding being
made available by Scottish Government. 
Funding This work is subject to funding via the Scottish Government
flood capital monies. This funding has not been allocated at
the time of the production of this report.
Coordination The action delivery lead is The Moray Council in coordination
with other Responsible Authorities  including community
engagement  
Page 219

Page 220

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
58
PUBLIC
Action ID  Elgin 39204
Action Type Community engagement
Action Delivery
Lead
Moray Council Indicative Delivery Ongoing
Description The Responsible Authorities to continue to engage with the
community, with particular focus on the detailed design of
works identified in the Surface Water Management Plan and
building community resilience
Funding Moray Council Revenue
Coordination Moray will coordinate with Responsible Authorities to ensure
that communities are aware of the risk and resilient to the risk
of flooding  
Action ID  Elgin 39205
Action Type Flood scheme or works implementation
Action Delivery
Lead
Moray Council Indicative Delivery 2027-2028
Description Progress the flood works based on the detailed design to
reduce surface water flood risk in Elgin.
The Responsible Authorities proposes this action as the best
viable option for managing flood risk in this community. The
delivery of this action is subject to capital funding being made
available by Scottish Government. 
Funding This work is subject to funding via the Scottish Government
flood capital monies. This funding has not been allocated at
the time of the production of this report.
Coordination The action delivery lead is Moray Council in coordination with
other Responsible Authorities including community
engagement
Page 220

Page 221

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
59
PUBLIC
2.4.6 02/05/06 (Forres)
Forres is designated as a Potentially Vulnerable Area due to the risk of river and
surface water flooding. Forres benefits from 2 flood protection schemes, one on the
Burn of Mosset and the other on the River Findhorn. 
There is 1 target area in this Potentially Vulnerable Area, which has been the focus
of further assessment, this is identified below. Further information on the objectives
and actions to manage flood risk within this area is provided below. 
List of target areas 
Forres (target area 427)
Page 221

Page 222

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
60
PUBLIC
Local Flood Risk Management plan datasheet
2.4.6.1 Forres 427  
Summary Location Map
Forres is located in the north east of
Scotland and is within the Moray
Council area. The main source of
flooding in Forres is surface water
flooding. However there is also a risk of
river flooding, which is largely managed
by the 2 flood schemes. There are
approximately 2,000 people and 1,000
homes and businesses currently at risk
from flooding. This is likely to increase
to 2,400 people and 1,200 homes and
businesses by the 2080s due to climate
change. 
What is the Current understanding of Flood risk
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national level assessments of flooding from rivers, surface water and
coastal sources. The national level assessment is improved for river flooding by
the studies to develop the Forres (River Findhorn and Pilmuir) and the Forres
(Burn of Mosset) Flood Alleviation Schemes. The understanding of surface water
flood risk is improved by the Moray Surface Water Management Plan. Prior to the
development of the flood protection schemes there was a long history of river
flooding in Forres, including notable flooding in 1997 when the Burn of Mosset
burst its banks. There are frequent records of surface water flooding. 
Objective ID Description
Avoid flood risk 4271 Avoid an increase in flood risk by the appropriate
management and maintenance of the Forres
(Burn of Mosset) Flood Prevention Scheme 2005
and the Forres (Findhorn and Pilmuir) Flood
Prevention Scheme 2008
Page 222

Page 223

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
61
PUBLIC
Avoid flood risk 4272 Avoid inappropriate development that increases
flood risk in Forres
Improve data and
understanding
4273 Improve data and understanding of the
performance of the flood protection assets in
Forres
Prepare for flooding 4274 Prepare for current flood risk and future flooding
as a result of climate change in Forres
Reduce flood risk 4275 Reduce the risk of surface water flooding in
Forres 
Action ID  Forres 42701
Action Type Flood defence maintenance
Action Delivery
Lead
Moray Council Indicative Delivery Ongoing
Description Continue to maintain the Forres (Burn of Mosset, 2005) Flood
Alleviation Scheme and the Forres (Findhorn and Pilmuir,
2008) Flood Alleviation Scheme.
Funding Moray Council Revenue
Coordination Moray Council will continue to maintain the scheme liaising
with Responsible Authorities and the community on issues
that may arise 
Action ID  Forres 42702
Action Type Flood study (existing flood defences)
Action Delivery
Lead
Moray Council Indicative Delivery 2022-2023
Description Assess the performance of the Forres (Burn of Mosset, 2005)
Flood Alleviation Scheme and the Forres (Findhorn and
Pilmuir, 2008) Flood Alleviation Scheme. This is because new
climate change data has become available since the
construction of the scheme. The need for an adaptation plan
should be evaluated.
Funding Moray Council Revenue
Coordination Moray Council will coordinate with Consultants and
landowners to deliver this work
Page 223

Page 224

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
62
PUBLIC  
Action ID  Forres 42703
Action Type Sewer flood risk assessment
Action Delivery
Lead
Scottish Water Indicative Delivery 2025-2027
Description Scottish Water will undertake a modelling assessment in the
Forres sewer catchment to improve knowledge and
understanding of flood risk in this area as required under
Section 16 of the Flood Risk Management (Scotland) Act
2009
Funding Funding for this action is secured within Scottish Water's
business plan
Coordination Outputs of this modelling assessment will be shared with
local authorities and SEPA  
Action ID  Forres 42704
Action Type Surface Water Management Plan
Action Delivery
Lead
Moray Council Indicative Delivery Ongoing
Description Continue to develop  the Surface Water Management Plan,
working with Scottish Water to identify opportunities with
regard to surface water flooding in Forres
Funding Moray Council Revenue 
Coordination The action delivery lead is The Moray Council and
coordinated with Scottish Water. 
Page 224

Page 225

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
63
PUBLIC
Action ID  Forres 42705
Action Type Flood warning maintenance
Action Delivery
Lead
SEPA Indicative Delivery Ongoing 
Description SEPA will maintain the River Findhorn flood warning scheme.
Funding SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Coordination SEPA will work with Moray Council on the potential to use
information from the flood study to inform ongoing flood
warning. SEPA will continue to raise awareness of flood
warning, and engage with communities about the service
when required. 
Chapelton Flood Storage Reservoir. 
Page 225

Page 226

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
64
PUBLIC
2.4.7 02/05/07 (Dallas)
This area is designated as a Potentially Vulnerable Area due to a large proportion of
Dallas being at risk of flooding from the River Lossie. Recent floods have occurred
as a result of river flooding. Moray Council delivered flood protection works to benefit
properties, however, surrounding roads remain at risk of flooding. 
There is one target area in this Potentially Vulnerable Area, which has been the
focus of further assessment, this is identified below. Further information on the
objectives and actions to manage flood risk within this area is provided below. 
List of target areas 
Dallas (target area 421)
Page 226

Page 227

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
65
PUBLIC
Local Flood Risk Management plan datasheet
2.4.7.1 Dallas 421  
Summary Location Map
Dallas is south west of Elgin on the
banks of the River Lossie. It is within the
Moray Council area. The main source of
flooding in Dallas is river flooding. There
are approximately 30 people and 20
homes and businesses currently at risk
from flooding. This is likely to increase
to 40 people and 30 homes and
businesses by the 2080s due to climate
change. Dallas benefits from a flood
protection embankment, which reduces
flood risk from the River Lossie. 
What is the Current understanding of Flood risk
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national level assessments of flooding from rivers, surface water and
coastal sources, and this national assessment has highlighted the risk of flooding
from the River Lossie to a significant proportion of the community in Dallas.
Access roads are also at risk. Dallas has therefore been identified as a new target
area for the 2021 flood risk management plans. The national assessment of
flooding from the River Lossie has improved through the Dallas Flood Appraisal
Study (2016) which identified the option of a set-back embankment to reduce flood
risk. The embankment was built in 2017. Prior to its construction there was
periodic flooding from the River Lossie in the Dallas target area. 
Page 227

Page 228

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
66
PUBLIC
Objective ID Description
Avoid flood risk 4211 Avoid inappropriate development that increases
flood risk in Dallas
Avoid flood risk 4212 Avoid an increase in flood risk by the appropriate
management and maintenance of the Dallas
flood retaining embankment
Improve data and
understanding
4213 Improve data and understanding of the
performance of the flood protection asset in
Dallas
Prepare for flooding 4214 Prepare for current flood risk and future flooding
as a result of climate change in Dallas 
Action ID  Dallas 42101
Action Type Flood defence maintenance
Action Delivery
Lead
Moray Council Indicative Delivery Ongoing
Description Continue to maintain the existing flood defences in Dallas.
Funding Moray Council Revenue
Coordination Moray Council will continue to maintain the embankment liaising
with Responsible Authorities and the community on issues that
may arise 
Action ID  Dallas 42102
Action Type Flood warning maintenance
Action Delivery
Lead
SEPA Indicative Delivery Ongoing
Description SEPA will maintain the River Lossie flood warning scheme.
Funding SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Coordination SEPA will work with Moray Council on the potential to use
information from the flood studies to inform ongoing flood
warning. SEPA will continue to raise awareness of flood
warning, and engage with communities about the service
when required.
Page 228

Page 229

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
67
PUBLIC
Action ID  Dallas 42103
Action Type Flood study (existing flood defences)
Action Delivery
Lead
Moray Council Indicative Delivery 2024-2025
Description Assess the performance of the existing flood defences in
Dallas. The impacts of climate change on flood risk will also
be considered. As built drawings will be made available to
SEPA, for inclusion in the Scottish Flood Defence Asset
Database.
Funding Moray Council Revenue
Coordination Moray Council will coordinate with landowners to deliver this
work
Page 229

Page 230

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
68
PUBLIC
2.4.8 02/05/08 (Nairn)
Nairn is designated as a Potentially Vulnerable Area due to the risk of river, coastal
and surface water flooding. The main sources of river flooding are the River Nairn
and Auldearn Burn. Coastal wave overtopping has recently caused minor flooding in
Nairn. 
There are 2 target areas in this Potentially Vulnerable Area, which have been the
focus of further assessment, these are listed below. Further information on the
objectives and actions to manage flood risk within this area is provided below. 
List of target areas 
Nairn (target area 428)
Newmill (Nairn) (target area 9992)
Page 230

Page 231

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
69
PUBLIC
Local Flood Risk Management plan datasheet
2.4.8.1 Nairn 428  
Summary Location Map
Nairn is located along the southern
shore of the Moray Firth in the Highland
Council area. Nairn is at risk from river,
coastal and surface water flooding.
There are approximately 1,300 people
and 760 homes and businesses
currently at risk from flooding. This is
likely to increase to 1,700 people and
990 homes and businesses by the
2080s due to climate change. 
What is the Current understanding of Flood risk
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national level assessments of flooding from rivers, surface water and
coastal sources. The national level assessment is improved for coastal flooding by
the operation and maintenance of the Moray Firth flood warning scheme.
Understanding of surface water flooding is improved for surface water by a sewer
flood risk assessment. There is a long history of periodic flooding recorded in Nairn
from the River Nairn and the Auldearn Burn. There are also records of flooding to
Harbour Street caused by combined high tide and river levels.
The Dynamic Coast project has shown that parts of the shoreline in or adjacent to
this target area are subject to erosion at present or are considered likely to erode
in the future. Consideration should be given to how erosion might impact flood risk.
Page 231

Page 232

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
70
PUBLIC
Any actions taken should aim to support building natural resilience to flooding and
not lead to an increase in erosion. 
Objective ID Description
Avoid flood risk 4281 Avoid inappropriate development that increases
flood risk in Nairn
Prepare for flooding 4282 Prepare for current flood risk and future flooding
as a result of climate change in Nairn
Reduce flood risk 4283 Reduce the risk of flooding from the sea, River
Nairn, Auldearn Burn and Alton Burn in Nairn
Reduce flood risk 4284 Reduce the risk of surface water flooding in Nairn 
Action ID Nairn 42801
Action Type Flood study
Action Delivery
Lead
Highland Council  Indicative Delivery 2022-2024
Description The Highland Council to develop a coastal flood model and a
flood model of the River Nairn and Auldern Burn to determine
the extent of flood risk to Nairn. Subject to the outcome of the
modelling an appraisal of options to mitigate flooding will be
carried out, determining a preferred option. The Highland
Council to explore working with SEPA due to the potential
River Basin Management Planning objectives for the Auldern
Burn.
Funding Allocated in The Highland Council Capital Programme
Page 232

Page 233

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
71
PUBLIC
Coordination SEPA will work with The Highland Council on the potential to
coordinate this action with work on coastal flood mapping and
flood warning actions.
The Highland Council will coordinate the development of the
Study with actions of other responsible authorities and
engage local community groups. 
Action ID Nairn 42802
Action Type Strategic mapping improvements
Action Delivery
Lead
SEPA Indicative Delivery 2023-2024
Description SEPA has undertaken improved coastal modelling in this
target area including taking account of the impact of waves
on coastal flooding. We will complete and publish the
outcomes of this modelling work to inform decision making
with respect to flooding at the coast.
Funding SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authority on the potential to
coordinate the flood map update with any other actions being
carried out to understand or reduce coastal flooding.  
Page 233

Page 234

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
72
PUBLIC
Action ID Nairn 42803
Action Type Flood warning maintenance
Action Delivery
Lead
SEPA Indicative Delivery Ongoing 
Description SEPA should maintain the Moray Firth coastal and River
Nairn flood warning schemes.
Funding SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Coordination SEPA will work with The Highland Council on the potential to
use information from the flood study to inform ongoing flood
warning. SEPA will continue to raise awareness of flood
warning, and engage with communities about the service
when required. 
Action ID Nairn 42804
Action Type Flood study
Action Delivery
Lead
Highland Council Indicative Delivery 2028-2034
Description The Highland Council to develop a flood model of the Alton
Burn to determine the extent of flood risk to parts of Nairn
from the burn. Subject to the outcome of the modelling an
appraisal of options to mitigate flooding will be carried out,
determining a preferred option.
Funding Not yet allocated in Capital Programme
Coordination The action delivery lead is The Highland Council 
Page 234

Page 235

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
73
PUBLIC
Local Flood Risk Management plan datasheet
2.4.8.2 Newmill (Nairn) 9992  
Summary Location Map
Newmill is a village to the south east of
Nairn in the Highland Council area.
Newmill is at risk from river and surface
water flooding. There are approximately
20 people and 10 properties currently at
risk of flooding, which is a significant
proportion of the community. This is
unlikely to increase significantly by the
2080s due to climate change. 
What is the Current understanding of Flood risk
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national level assessments of flooding from rivers, surface water and
coastal sources, and this national assessment has highlighted the risk of flooding
in this target area.  There are limited records of flooding in the Newmill (Nairn)
target area. 
Page 235

Page 236

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
74
PUBLIC
Objective ID Description
Avoid flood risk 99921 Avoid inappropriate development that increases
flood risk in Newmill
Prepare for flooding 99922 Prepare for current flood risk and future flooding
as a result of climate change in Newmill
Reduce flood risk 99923 Reduce the risk of flooding in Newmill from the
Auldearn Burn 
Action ID Newmill (Nairn) 999201
Action Type Flood risk management review
Action Delivery
Lead
SEPA Indicative Delivery 2022-2028
Description No local actions specific to this target area have been
identified yet. There are national actions planned that will
cover this area, including an update to SEPA's surface water
flood maps and an update to the national flood risk
assessment. These, along with other actions that are carried
out across the whole local plan district covering this area, will
help to manage flood risk in the long term. The need for
actions for this area will be reviewed again in 2026.
Funding SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Coordination SEPA will work with the other responsible authorities to
review flood risk management for this area, through the Local
Plan District Partnerships. A public consultation on priority
areas will be held in 2024 by SEPA, which will be open for
three months. A public consultation on future flood
Page 236

Page 237

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
75
PUBLIC
management actions will be held in December 2026 and will
be open for at least three months.  
Action ID Newmill (Nairn) 999202
Action Type Flood study
Action Delivery
Lead
Highland Council Indicative Delivery Cycle 3
Description The Highland Council to develop a flood model of the
Auldearn Burn to determine the extent of flood risk to Newmill
from the burn. Subject to the outcome of the modelling an
appraisal of options to mitigate flooding will be carried out,
determining a preferred option.
Funding Not yet allocated in Capital Programme
Coordination The action delivery lead is The Highland Council 
Page 237

Page 238

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
76
PUBLIC
2.4.9 02/05/09 (Rothes & Aberlour)
This area is designated as a Potentially Vulnerable Area due to the risk of surface
water flooding in Aberlour and Rothes. River flood risk (including from the Back Burn,
Burn of Rothes and Black Burn) is managed by the Rothes Flood Protection
Scheme. 
There are two target areas in this Potentially Vulnerable Area, which have been the
focus of further assessment, these are listed below. Further information on the
objectives and actions to manage flood risk within this area is provided below. 
List of target areas 
Rothes (target area 397)
Aberlour (target area 432)
Page 238

Page 239

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
77
PUBLIC
Local Flood Risk Management plan datasheet
2.4.9.1 Rothes 397  
Summary Location Map
Rothes is on the banks of the River
Spey and is within the Moray Council
area. The main source of flooding in
Rothes is from surface water flooding,
however there is also a risk from river
flooding. There are approximately 780
people and 520 homes and businesses
currently at risk from flooding, which is a
significant proportion of the community.
This is likely to increase to 830 people
and 560 homes and businesses by the
2080s due to climate change. 
What is the Current understanding of Flood risk
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national level assessments of flooding from rivers, surface water and
coastal sources. The national level assessment is improved for surface water by
the Moray Surface Water Management Plan. The understanding of flood risk from
the Burn of Rothes, Back Burn and Black Burn is underpinned by the studies to
develop the Rothes Flood Protection Scheme. The understanding of flood risk
from the River Spey is improved by the development and operation of the Spey
flood warning scheme. There is a long history of flooding in Rothes, including
notable flooding in September 2009 from the River Spey, the Back Burn and the
Burn of Rothes, prior to the completion of the Rothes Flood Protection Scheme. 
Page 239

Page 240

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
78
PUBLIC
Objective ID Description
Avoid flood risk 3971 Avoid inappropriate development that increases
flood risk in Rothes
Avoid flood risk 3972 Avoid an increase in flood risk by the appropriate
management and maintenance of the Rothes
Flood Prevention Schemes
Improve data and
understanding
3973 Improve data and understanding of the
performance of the flood protection assets in
Rothes
Prepare for flooding 3974 Prepare for current flood risk and future flooding
as a result of climate change in Rothes
Reduce flood risk 3975 Reduce the risk of surface water flooding to
Rothes 
Action ID  Rothes 39701
Action Type Flood scheme or works design
Action Delivery
Lead
Moray Council Indicative Delivery 2026-2027
Description The selected preferred approach for managing surface water
flood risk is to be designed following the completion of the
flood study, including consideration of the long-term impacts
of climate change. These can include small scale works or
works to improve catchment management. This should guide
adaptive planning to allow for the impacts of climate change
to be monitored, understood and managed. 
The responsible authority proposes this action as the best
viable option for managing flood risk in this community. The
Page 240

Page 241

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
79
PUBLIC
delivery of this action is subject to capital funding being made
available.
In accordance with the flood risk management plan, as part of
the scheme or works, the responsible authority should aim to
ensure that the action will not have an adverse effect on the
integrity of the River Spey Special Area of Conservation. 
Funding This works is subject to funding via the Scottish Government
flood capital monies. This monies has not been allocated at
the time of the production of this report.
Coordination The action delivery lead is The Moray Council in coordination
with other responsible authority including community
engagement  
Action ID  Rothes 39702
Action Type Community engagement
Action Delivery
Lead
Moray Council Indicative Delivery Ongoing
Description The Responsible Authorities to continue to engage with the
community, with particular focus on the detailed design of
works identified in the Surface Water Management Plan, and
building community resilience
Funding Moray Council Revenue
Coordination Moray will coordinate with Responsible Authorities to ensure
that communities are aware of the risk and resilient to the risk
of flooding  
Page 241

Page 242

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
80
PUBLIC
Action ID  Rothes 39703
Action Type Flood scheme or works implementation
Action Delivery
Lead
Moray Council Indicative Delivery 2027-2028
Description The Surface Water flood scheme/works is to be built following
agreement of the design, costs and timescales. 
The responsible authority proposes this action as the best
viable option for managing flood risk in this community. The
delivery of this action is subject to capital funding being made
available.
Funding This works is subject to funding via the Scottish Government
flood capital monies. This funding has not been allocated at
the time of the production of this report.
Coordination The action delivery lead is The Moray Council in coordination
with other Responsible Authorities including community
engagement  
Action ID  Rothes 39704
Action Type Flood defence maintenance
Action Delivery
Lead
Moray Council Indicative Delivery Ongoing
Description Continue to maintain the Rothes Flood Protection Scheme
(2011).
Funding Moray Council Revenue
Coordination Moray Council will continue to maintain the scheme liaising
with Responsible Authorities and the community on issues
that may arise
Page 242

Page 243

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
81
PUBLIC  
Action ID  Rothes 39705
Action Type Flood study (existing flood defences)
Action Delivery
Lead
Moray Council Indicative Delivery 2023-2024
Description Assess the performance of the Rothes Flood Protection
Scheme (2011). This is because new climate change data
has become available since the construction of the scheme.
The need for an adaptation plan will be evaluated.
Funding Moray Council Revenue
Coordination Moray Council will coordinate with Consultants and
landowners to deliver this work  
Action ID  Rothes 39706
Action Type Flood warning maintenance
Action Delivery
Lead
SEPA Indicative Delivery Ongoing
Description SEPA will maintain the River Spey flood warning scheme.
Funding SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authorities on the potential to
use information from any flood studies in the Spey catchment
to inform ongoing flood warning. SEPA will continue to raise
awareness of flood warning, and engage with communities
about the service when required. 
Page 243

Page 244

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
82
PUBLIC
Local Flood Risk Management plan datasheet
2.4.9.2 Aberlour 432  
Summary Location Map
Aberlour lies 20km south of Elgin and is
within the Moray Council Area. The
main source of flooding in Aberlour is
surface water flooding, however there is
also risk of river flooding. There are
approximately 130 people and 90
homes and businesses currently at risk
from flooding. This is likely to increase
to 140 people and 110 homes and
businesses by the 2080s due to climate
change. 
What is the Current understanding of Flood risk
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national level assessments of flooding from rivers, surface water and
coastal sources. The national level assessment is improved for surface water
flooding by the Moray Surface Water Management Plan. Understanding is
improved for river flooding by the development and operation of the River Spey
flood warning scheme. There is a long history of flooding in the Aberlour target
area. 
Page 244

Page 245

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
83
PUBLIC
Objective ID Description
Avoid flood risk 4321 Avoid an increase in flood risk by the appropriate
management and maintenance of the Aberlour -
Moray Flood Prevention Scheme 1984
Avoid flood risk 4322 Avoid inappropriate development that increases
flood risk in Aberlour
Improve data and
understanding
4323 Improve data and understanding of the Aberlour -
Moray Flood Prevention Scheme 1984
Prepare for flooding 4324 Prepare for current flood risk and future flooding
as a result of climate change in Aberlour
Reduce flood risk 4325 Reduce the risk of surface water flooding to
Aberlour 
Action ID  Aberlour 43201
Action Type Flood study (existing flood defences)
Action Delivery
Lead
Moray Council Indicative Delivery 2023-2024
Description Assess the performance of the Aberlour Flood Protection
Scheme. The scheme was designed in the 1980s. Since then
new modelling techniques and data have emerged. The
impacts of climate change on flood risk will also be
considered. The need for an adaptation plan should be
evaluated.
Funding Moray Council Revenue
Coordination Moray Council will coordinate with Consultants and
landowners to deliver this work  
Page 245

Page 246

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
84
PUBLIC
Action ID  Aberlour 43202
Action Type Surface Water Management Plan
Action Delivery
Lead
Moray Council Indicative Delivery Ongoing
Description Implement the Surface Water Management Plan, working
with Scottish Water as appropriate. This may be progressed
further as part of the flood study and a wider adaptation plan
for Aberlour.
Funding Moray Council Revenue Funds
Coordination The action delivery lead is The Moray Council in coordination
with Scottish Water.  
Action ID  Aberlour 43203
Action Type Flood defence maintenance
Action Delivery
Lead
Moray Council Indicative Delivery Ongoing
Description Continue to maintain the Aberlour Flood Protection Scheme.
Funding Moray Council Revenue
Coordination Moray Council will continue to maintain the scheme liaising
with Responsible Authorities  and the community on issues
that may arise  
Page 246

Page 247

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
85
PUBLIC
Action ID  Aberlour 43204
Action Type Flood warning maintenance
Action Delivery
Lead
SEPA Indicative Delivery Ongoing 
Description SEPA should maintain the River Spey flood warning scheme.
Funding SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authorities on the potential to
use information from any flood studies in the Spey catchment
to inform ongoing flood warning. SEPA will continue to raise
awareness of flood warning, and engage with communities
about the service when required. 
Page 247

Page 248

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
86
PUBLIC
2.4.10  02/05/10 (Aviemore)
Aviemore is designated as a Potentially Vulnerable Area due to the risk of flooding
from the River Spey, Aviemore Burn and from surface water. Recent flooding was
caused by rivers. 
There is 1 target area in this Potentially Vulnerable Area, which has been the focus
of further assessment, this is identified below. Further information on the objectives
and actions to manage flood risk within this area is provided below. 
List of target areas 
Aviemore (target area 396)
Page 248

Page 249

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
87
PUBLIC
Local Flood Risk Management plan datasheet
2.4.10.1 Aviemore 396  
Summary Location Map
Aviemore is in the Cairngorms National
Park on the banks of the River Spey. It
is within the Highland Council area.
Aviemore is at risk from river and
surface water flooding. There are
approximately 430 people and 240
homes and businesses currently at risk
from flooding. This is likely to increase
to 490 people and 270 homes and
businesses by the 2080s due to climate
change. 
What is the Current understanding of Flood risk
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national level assessments of flooding from rivers, surface water and
coastal sources. The national level assessment for river flooding is improved by
the development and operation of the River Spey flood warning scheme. The
understanding of surface water flooding is improved by a sewer flood risk
assessment. There is a long history of flooding in Aviemore from the River Spey
including a notable flood in December 2015 when the River Spey overflowed its
banks during Storm Desmond. There are also records of flooding from the
Aviemore Burn. 
Objective ID Description
Avoid flood risk 3961 Avoid inappropriate development that increases
flood risk in Aviemore
Prepare for flooding 3962 Prepare for current flood risk and future flooding
as a result of climate change in Aviemore
Page 249

Page 250

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
88
PUBLIC
Reduce flood risk 3963 Reduce the risk of flooding from the River Spey
and Aviemore Burn in Aviemore 
Action ID Aviemore 39601
Action Type Flood study
Action Delivery
Lead
Highland Council Indicative Delivery 2022-2028
Description The Highland Council to develop a flood model of the
Aviemore Burn to determine the extent of flood risk to
Aviemore from the burn. Subject to the outcome of the
modelling an appraisal of options to mitigate flooding will be
carried out, determining a preferred option.
Funding Not currently allocated in THC Capital Programme
Coordination The action delivery lead is The Highland Council and
coordination will be determined once the actions have been
finalised, but would include Transport Scotland given their
studies for A9 dualling. 
Action ID Aviemore 39602
Action Type Flood warning maintenance
Action Delivery
Lead
SEPA Indicative Delivery Ongoing
Description SEPA should maintain the River Spey flood warning scheme.
Funding SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authorities on the potential to
use information from any flood studies in the Spey catchment
to inform ongoing flood warning. SEPA will continue to raise
awareness of flood warning, and engage with communities
about the service when required.  
Page 250

Page 251

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
89
PUBLIC
Action ID Aviemore 39603
Action Type Flood warning maintenance
Action Delivery
Lead
SEPA Indicative Delivery ongoing
Description SEPA should investigate improvements to the River Spey
flood warning scheme.
Funding SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authorities on the potential to
use any information from any flood studies in the Spey
catchment to inform ongoing flood warnings. SEPA will
continue to raise awareness of flood warning, and engage
with communities about the service when required. 
Page 251

Page 252

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
90
PUBLIC
2.4.11  02/05/11 (Kingussie)
This is designated as a Potentially Vulnerable Area due to river flood risk to
Kingussie. The main source of flooding is the Gynack Burn. Recent flooding was
caused by rivers. 
There is 1 target area in this Potentially Vulnerable Area, which has been the focus
of further assessment, this is identified below. Further information on the objectives
and actions to manage flood risk within this area is provided below. 
List of target areas 
Kingussie (target area 395)
Page 252

Page 253

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
91
PUBLIC
Local Flood Risk Management plan datasheet
2.4.11.1 Kingussie 395  
Summary Location Map
Kingussie is situated in the Cairngorms
National Park on the banks of the River
Spey. It is within the Highland Council
Area. The main source of flooding in
Kingussie is river flooding. There are
approximately 270 people and 180
homes and businesses currently at risk
from flooding. This is likely to increase
to 330 people and 220 homes and
businesses by the 2080s due to climate
change. 
What is the Current understanding of Flood risk
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national level assessments of flooding from rivers, surface water and
coastal sources. The understanding of river flooding has improved by the recent
flood modelling of the River Gynack to determine the extent of flood risk to
Kingussie. Whilst the River Gynack is the main source of flooding in Kingussie, the
understanding of flooding from the River Spey has also improved through the
development and operation of the River Spey flood warning scheme. The
understanding of surface water flood risk is improved by a sewer flood risk
assessment. There are records of regular flooding from the River Gynack in
Kingussie including a notable flood in August 2014 due to ex-Hurricane Bertha. 
Objective ID Description
Avoid flood risk 3951 Avoid inappropriate development that increases
flood risk in Kingussie
Prepare for flooding 3952 Prepare for current flood risk and future flooding
as a result of climate change in Kingussie
Page 253

Page 254

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
92
PUBLIC
Reduce flood risk 3953 Reduce the risk of flooding from the Gynack Burn
in Kingussie 
Action ID Kingussie 39501
Action Type Flood study
Action Delivery
Lead
Highland Council Indicative Delivery 2022-2028
Description The Highland Council has developed a flood model of the
River Gynack to determine the extent of flood risk to
Kingussie. Based on the outcome of the modelling an
appraisal of options to mitigate flooding will be carried out,
determining a preferred option.
Funding Not currently allocated in THC Capital Programme
Coordination The action delivery lead is The Highland Council 
Action ID Kingussie 39502
Action Type Flood warning maintenance
Action Delivery
Lead
SEPA Indicative Delivery Ongoing
Description SEPA should maintain the River Spey flood warning scheme.
Funding SEPA’s role in this action is funded by the Scottish
Government through SEPA’s grant in aid settlement 
Coordination SEPA will work with the local authorities on the potential to
use any information from any flood studies in the Spey
catchment to inform ongoing flood warnings. SEPA will
continue to raise awareness of flood warning, and engage
with communities about the service when required.  
Page 254

Page 255

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
93
PUBLIC
Action ID Kingussie 39503
Action Type Flood warning maintenance
Action Delivery
Lead
SEPA Indicative Delivery Ongoing
Description SEPA should investigate improvements to the River Spey
flood warning scheme.
Funding SEPA’s role in this action is funded by the Scottish
Government through SEPA’s grant in aid settlement
Coordination SEPA will work with the local authorities on the potential to
use any information from any flood studies in the Spey
catchment to inform ongoing flood warnings. SEPA will
continue to raise awareness of flood warning, and engage
with communities about the service when required. 
Page 255

Page 256

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
94
PUBLIC
2.4.12  02/05/12 (Newtonmore)
This is designated as a Potentially Vulnerable Area as Newtonmore is at risk of
flooding from surface water. Past flooding in the area was caused by surface water. 
There is 1 target area in this Potentially Vulnerable Area, which has been the focus
of further assessment, this is identified below. Further information on the objectives
and actions to manage flood risk within this area is provided below. 
List of target areas 
Newtonmore (target area 443)
Page 256

Page 257

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
95
PUBLIC
Local Flood Risk Management plan datasheet
2.4.12.1 Newtonmore 443  
Summary Location Map
Newtonmore is in the Cairngorms
National Park within the Highland
Council area. The River Spey is located
to the south and south-west of the
village. The main source of flooding in
Newtonmore is surface water flooding.
There are approximately 130 people
and 100 homes and businesses
currently at risk from flooding. This is
likely to increase to 140 people and 110
homes and businesses by the 2080s
due to climate change. 
What is the Current understanding of Flood risk
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national level assessments of flooding from rivers, surface water and
coastal sources. The understanding of surface water flood risk is improving due to
the ongoing development of a Highland wide surface wide management plan
which includes Newtonmore as a priority area. A sewer flood risk assessment has
also been completed. There are periodic records of flooding in Newtonmore. 
Page 257

Page 258

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
96
PUBLIC
Objective ID Description
Avoid flood risk 4431 Avoid inappropriate development that increases
flood risk in Newtonmore
Prepare for flooding 4432 Prepare for current flood risk and future flooding
as a result of climate change in Newtonmore
Reduce flood risk 4433 Reduce the risk of surface water flooding in
Newtonmore 
Action ID Newtonmore 44301
Action Type Sewer flood risk assessment
Action Delivery
Lead
Scottish Water Indicative Delivery 2022/28
Description Scottish Water will carry out an assessment of sewer flood
risk within the highest priority sewer catchments, which
includes Newtonmore sewer catchment in this target area.
This will help to improve knowledge and understanding of
potential surface water flood risk. Funding for this action is
secured through Scottish Water's strategic planning
commitments.
Funding Funding for this action is secured within Scottish Water's
business plan
Coordination The action delivery lead is Scottish Water in coordination with
the local authority and SEPA.  
Page 258

Page 259

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
97
PUBLIC
Action ID Newtonmore 44302
Action Type Surface Water Management Plan
Action Delivery
Lead
Highland Council Indicative Delivery 2022/28
Description The Highland Council to continue to develop and implement
the Highland wide Surface Water Management Plan, which
includes Newtonmore as a priority area. The Surface Water
Management Plan identifies areas most at risk from surface
water flooding in Newtonmore and identifies options that
could alleivate this risk.
Funding Allocated in THC Capital Programme
Coordination The action delivery lead is The Highland Council in
coordination with Scottish Water and other actions in the
area.  
Action ID Newtonmore 44303
Action Type Flood warning maintenance
Action Delivery
Lead
SEPA Indicative Delivery Ongoing
Description SEPA should maintain the River Spey flood warning scheme.
Funding SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authorities on the potential to
use information from any flood studies in the Spey Catchment
to inform ongoing flood warning. SEPA will continue to raise
awareness of flood warning, and engage with communities
about the services when require.  
Page 259

Page 260

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
98
PUBLIC
Action ID Newtonmore 44304
Action Type Flood warning maintenance
Action Delivery
Lead
SEPA Indicative Delivery Ongoing
Description SEPA should investigate improvements to the River Spey
flood warning scheme.
Funding SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authorities on the potential to
use information from any flood studies in the Spey Catchment
to inform ongoing flood warning. SEPA will continue to raise
awareness of flood warning, and engage with communities
about the services when require.  
Page 260

Page 261

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
99
PUBLIC
2.4.13  02/05/13 (Dalwhinnie)
This is designated as a Potentially Vulnerable Area as Dalwhinnie is at risk of river
flooding. Recent flooding was caused by both river and surface water. 
There is 1 target area in this Potentially Vulnerable Area, which has been the focus
of further assessment, this is identified below. Further information on the objectives
and actions to manage flood risk within this area is provided below. 
List of target areas 
Dalwhinnie (target area 394)
Page 261

Page 262

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
100
PUBLIC
Local Flood Risk Management plan datasheet
2.4.13.1 Dalwhinnie 394  
Summary Location Map
Dalwhinnie is on the edge of the
Cairngorms National Park in the
Highland Council area. The main source
of flooding in Dalwhinnie is river
flooding. There are approximately 30
people and 30 homes and businesses
currently at risk from flooding, which is a
significant proportion of the community.
This is not expected to change
significantly by the 2080s due to climate
change. 
What is the Current understanding of Flood risk
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national level assessments of flooding from rivers, surface water and
coastal sources. The national level assessment for river flooding is improving as a
result of the ongoing mapping and modelling of the River Truim and its tributaries.
There are limited records of flooding in the Dalwhinnie target area. 
Objective ID Description
Avoid flood risk 3941 Avoid inappropriate development that increases
flood risk in Dalwhinnie
Page 262

Page 263

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
101
PUBLIC
Improve data and
understanding
3942 Improve data and understanding of the risk of
river flooding in Dalwhinnie
Prepare for flooding 3943 Prepare for current flood risk and future flooding
as a result of climate change in Dalwhinnie 
Action ID Dalwhinnie 39401
Action Type Flood risk management review
Action Delivery
Lead
SEPA Indicative Delivery 2022-2028
Description No local actions specific to this target area have been
identified yet. There are national actions planned that will
cover this area, including an update to SEPA's surface water
flood maps and an update to the national flood risk
assessment. These, along with other actions that are carried
out across the whole local plan district covering this area, will
help to manage flood risk in the long term. The need for
actions for this area will be reviewed again in 2026.
Funding SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Coordination SEPA will work with the other responsible authorities to
review flood risk management for this area, through the Local
Plan District Partnerships. A public consultation on priority
areas will be held in 2024 by SEPA, which will be open for
three months. A public consultation on future flood
management actions will be held in December 2026 and will
be open for at least three months.  
Page 263

Page 264

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
102
PUBLIC
2.4.14  02/05/14 (Kinloss)
Kinloss is designated as a Potentially Vulnerable Area due to the flood risk from
rivers and surface water. A small number of properties are at risk of coastal flooding.
Due to climate change induced sea-level rise, this flood risk is expected to increase.
Recent flooding was a result of surface water. 
There is one target area in this Potentially Vulnerable Area, which has been the
focus of further assessment, this is identified below. Further information on the
objectives and actions to manage flood risk within this area is provided below. 
List of target areas 
Kinloss (target area 420)
Page 264

Page 265

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
103
PUBLIC
Local Flood Risk Management plan datasheet
2.4.14.1 Kinloss 420  
Summary Location Map
Kinloss is a village located near the
shore of Findhorn Bay in the Moray
Council area. The main source of
flooding in Kinloss is from river flooding,
however there is also a risk of surface
water and coastal flooding. There are
approximately 320 people and 220
homes and businesses currently at risk
from flooding. This is likely to increase
to 390 people and 270 homes and
businesses by the 2080s due to climate
change. 
What is the Current understanding of Flood risk
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national level assessments of flooding from rivers, surface water and
coastal sources, and this national assessment has highlighted the risk of flooding
to a significant proportion of the community in Kinloss. This risk is also expected to
increase with climate change. Kinloss has therefore been identified as a new
target area for the 2021 flood risk management plans. The national assessment is
improved for coastal flooding by the development and operation of the Moray Firth
flood warning scheme. There are limited records of flooding in Kinloss. 
Page 265

Page 266

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
104
PUBLIC
Objective ID Description
Avoid flood risk 4201 Avoid inappropriate development that increases
flood risk in Kinloss
Prepare for flooding 4202 Prepare for current flood risk and future flooding
as a result of climate change in Kinloss
Improve data and
understanding
4203 Improve understanding of the risk of surface
water, river and coastal flooding in Kinloss 
Action ID  Kinloss 42001
Action Type Sewer flood risk assessment
Action Delivery
Lead
Scottish Water Indicative Delivery 2025-2027
Description Scottish Water will undertake a modelling assessment in the
Forres sewer catchment to improve knowledge and
understanding of flood risk in this area as required under
Section 16 of the Flood Risk Management (Scotland) Act
2009
Funding Funding for this action is secured within Scottish Water's
business plan
Coordination Outputs of this modelling assessment will be shared with
local authorities and SEPA 
Page 266

Page 267

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
105
PUBLIC
Action ID  Kinloss 42002
Action Type Flood warning maintenance
Action Delivery
Lead
SEPA Indicative Delivery Ongoing
Description SEPA will maintain the Moray Firth coastal flood warning
scheme.
Funding SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authorities on the potential to
use information from any flood studies around the Moray Firth
coast to inform ongoing flood warning. SEPA will continue to
raise awareness of flood warning, and engage with
communities about the services when require.  
Action ID  Kinloss 42003
Action Type Data collection
Action Delivery
Lead
Moray Council Indicative Delivery 2026-2028
Description Data collection and monitoring will be carried out to improve
the confidence in flood sources, mechanisms and risk. A
review may be required to assess the need for rain and/or
river gauges. Post flood event surveys may be required to
collect data on flooding mechanisms, risk and damage
caused.
Funding Moray Council Revenue
Coordination The action delivery lead is The Moray Council working with
SEPA and Scottish water to ensure appropriateness of
results
Page 267

Page 268

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
106
PUBLIC
Action ID  Kinloss 42004
Action Type Flood study
Action Delivery
Lead
Moray Council Indicative Delivery 2026-2027
Description A flood study will be carried out to improve understanding of
flood risk in Kinloss. The impacts of climate change on flood
risk should be assessed.
Funding Moray Council Revenue
Coordination The action delivery lead is The Moray Council in coordination
with other responsible authority including community
engagement.  
Page 268

Page 269

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
107
PUBLIC
2.4.15  02/05/15 (Nethy Bridge)
This is designated as a Potentially Vulnerable Area due to a risk of river flooding to
Nethy Bridge. There are no records of recent flooding in Nethy Bridge. 
There is 1 target area in this Potentially Vulnerable Area, which has been the focus
of further assessment, this is identified below. Further information on the objectives
and actions to manage flood risk within this area is provided below. 
List of target areas 
Nethy Bridge (target area 434)
Page 269

Page 270

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
108
PUBLIC
Local Flood Risk Management plan datasheet
2.4.15.1 Nethy Bridge 434  
Summary Location Map
Nethy Bridge is a village on the banks of
the River Nethy in the Highland Council
area. Nethy Bridge is at risk of river and
surface water flooding. There are
approximately 180 people and 120
homes and businesses at risk from
flooding. This is likely to increase to 200
people and 130 homes and businesses
by the 2080s due to climate change. 
What is the Current understanding of Flood risk
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national level assessments of flooding from rivers, surface water and
coastal sources, and this national assessment has highlighted the risk of flooding
(principally from the River Nethy) in this area. Nethy Bridge has therefore been
identified as a new target area for the 2021 flood risk management plans. There
are limited recent records of flooding in the Nethy Bridge target area. 
Page 270

Page 271

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
109
PUBLIC
Objective ID Description
Avoid flood risk 4341 Avoid inappropriate development that increases
flood risk in Nethy Bridge
Improve data and
understanding
4342 Improve data and understanding of the risk of
flooding from the River Nethy in Nethy Bridge
Prepare for flooding 4343 Prepare for current flood risk and future flooding
as a result of climate change in Nethy Bridge 
Action ID Nethy Bridge 43401
Action Type Flood study
Action Delivery
Lead
Highland Council Indicative Delivery 2024-2026
Description The Highland Council to develop a flood model of the River
Nethy and Duack Burn to determine the extent of flood risk to
Nethy Bridge from the river and the burn. Subject to the
outcome of the modelling an appraisal of options to mitigate
flooding will be carried out, determining a preferred option.
Funding Not currently allocated in THC Capital Programme
Coordination The action delivery lead is The Highland Council and
coordination will be determined once the actions have been
finalised. 
Action ID Nethy Bridge 43402
Action Type Community flood alert
Action Delivery
Lead
Nethy Bridge
Community 
Indicative Delivery 2
Page 271

Page 272

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
110
PUBLIC
Description A river level alerting system is being installed with the help of
the Scottish Flood Forum.
Funding Not currently allocated in THC Capital Programme
Coordination The action delivery lead is the community and coordination
will be determined once the actions have been finalised. 
Action ID Nethy Bridge 43403
Action Type Flood warning maintenance
Action Delivery
Lead
SEPA Indicative Delivery Ongoing
Description SEPA should maintain the River Spey flood warning scheme.
Funding SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authorities on the potential to
use information from any flood studies in the Spey catchment
to inform ongoing flood warning. SEPA will continue to raise
awareness of flood warning, and engage with communities
about the service when required. 
Action ID Nethy Bridge 43404
Action Type Flood warning maintenance
Action Delivery
Lead
SEPA Indicative Delivery 2028-2034
Description SEPA should investigate improvements to the River Spey
flood warning scheme.
Page 272

Page 273

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
111
PUBLIC
Funding SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authorities on the potential to
use information from any flood studies in the Spey catchment
to inform ongoing flood warning. SEPA will continue to raise
awareness of flood warning, and engage with communities
about the service when required. 
Page 273

Page 274

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
112
PUBLIC
3 Next Steps 
3.1 Next Steps and Monitoring Progress 
This Plan will run for six years from 2022. Over this period the Findhorn, Nairn and
Speyside LPD partnership will meet from time to time to monitor progress on
implementing the actions detailed in Section two of the Plan. Each partner
organisation will receive reports through its governance processes and actions
arising will be considered by the Steering Group. 
Between years two and three of the cycle (i.e. before Decemeber 2025), Moray
Council, as lead local authority will publish a report on the conclusions of a review of
the Plan, including information on the progress that has been made towards
delivering the actions identified in the Plan. 
Between years five and six of the cycle (i.e. before June 2028), Moray Council, as
lead local authority will publish a report on the Plan containing an assessment of the
progress made towards delivering the “current actions”, a summary of the actions not
implemented, with reasons why, and a description of any other actions undertaken
since the plan was finalised, which the lead local authority considers have
contributed to the achievement of the objectives in the Plan. 
Moray Council will make these reports available for public inspection. 
Page 274

Page 275

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
113
PUBLIC
4 Annexes
4.1 LPD Roles & Responsibilities 
Roles and responsibilities for flood risk management planning 
Individuals are the first line of defence against flooding. However, public and private
bodies have responsibilities too and are working together to reduce the impacts of
flooding in Scotland. SEPA, the local authorities and Scottish Water are
predominantly responsible for flood risk management planning. However, individuals
have a personal responsibility to protect themselves and their property. 
Some of the key roles are outlined below and more information is available from the
SEPA website. 
Your responsibilities 
Organisations and individuals have responsibilities to protect themselves from
flooding. Being prepared by knowing what to do and who to contact if flooding
happens can help you reduce the damage and disruption flooding can have on your
life. 
The first step to being prepared is signing up to Floodline so you can receive
messages to let you know where and when flooding is likely to happen. Other useful
tools and advice on how to be prepared are available on the Floodline website
including a quick guide to who to contact in the event of a flood. You can also check
how your area could be affected by flooding by looking at SEPA’s flood maps. 
SEPA 
SEPA is Scotland’s national flood forecasting, flood warning and strategic flood risk
management authority. SEPA has a statutory duty to produce Scotland's Flood Risk
Management Strategies. SEPA works closely with other organisations responsible
for managing flood risk through a network of partnerships and stakeholder groups to
ensure that a nationally consistent approach to flood risk management is adopted.
Page 275

Page 276

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
114
PUBLIC
SEPA also has a responsibility to identify where in Scotland there is the potential for
natural flood management techniques to be introduced. Natural flood management is
the use of the natural features of the land to store and slow down the flow of water. 
Floodline provides live flooding information and advice on how to prepare for or cope
with the impacts of flooding 24 hours a day, seven days a week. To help SEPA
forecast for flooding they work closely with the Met Office. 
To raise awareness of flooding at a national level SEPA runs education initiatives,
community engagement programmes and an annual campaign to promote the useful
advice and information available through Floodline. SEPA works in partnership with
local authorities, Neighbourhood Watch Scotland, Ready Scotland and others to
share our resources and help to promote preparedness and understanding of how
flood risk is managed. 
Local authorities 
Moray Council as lead local authority with the responsibility to produce the Plan has
worked together with The Highland Council, SEPA and other responsible authorities
for flood risk management planning purposes. It is the responsibility of each
organisation to implement its flood protection actions, including flood protection
schemes or works, operations and maintenance and the clearance and repair of
water bodies. You can help your local authority to manage flooding by letting them
know if debris is blocking watercourses or if flood defences are tampered with. 
During severe flooding, the local authorities will work with the emergency services
and coordinate shelter for people evacuated from their homes. 
Scottish Water 
Scottish Water is a responsible authority for flood risk management and is working
closely with SEPA, local authorities and others to coordinate plans to manage flood
risk. 
Scottish Water has the public drainage duty and is responsible for foul drainage and
the drainage of rainwater run-off from roofs and any paved ground surface from the
Page 276

Page 277

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
115
PUBLIC
boundary of properties. Additionally, Scottish Water helps to protect homes from
flooding caused by sewers either overflowing or becoming blocked. Scottish Water is
not responsible for private pipework or guttering within the property boundary.
National parks 
The Cairngorms National Park was designated as a responsible authority for flood
risk management purposes in 2012. It has worked with SEPA, local authorities and
Scottish Water to help develop the Strategy and Plan. It fulfils an important role in
land use planning, carrying out or granting permission for activities that can play a
key role in managing and reducing flood risk. 
Other organisations 
• The Scottish Government oversees the implementation of the Act which
requires the production of Strategies and Plans. Scottish Ministers are
responsible for setting the policy framework for how organisations collectively
manage flooding in Scotland. They have approved Strategy for this LPD. 
• NatureScot has provided general and local advice in the development of the
Strategy. Flooding is seen as a natural process that can maintain the features
of interest at many designated sites, so SNH helps to ensure that any
changes to patterns of flooding do not adversely affect the environment. SNH
also provides advice on the impact of Flood Protection Schemes and other
land use development on designated sites and species. 
• Forestry Commission Scotland was designated in 2012 as a responsible
authority for flood risk management planning purposes and has engaged in
the development of the Strategy through national and local advisory groups.
This reflects the widely held view that forestry can play a significant role in
managing flooding.
• During the preparation of the first flood risk management plans Network Rail
and Transport Scotland have agreed works to address flooding at a number
of frequently flooded sites. Further engagement is planned with SEPA and the
local authorities to identify areas of future work. There is the opportunity for
further works to be undertaken during the first flood risk management
planning cycle although locations for these works are yet to be confirmed.
Page 277

Page 278

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
116
PUBLIC
• Utility companies have undertaken site specific flood risk studies for their
primary assets and have management plans in place to mitigate the effects of
flooding to their assets and also minimise the impacts on customers. 
• The Met Office provides a wide range of forecasts and weather warnings.
SEPA and the Met Office work together through the Scottish Flood
Forecasting Service. 
• The emergency services provide emergency response when flooding occurs
and can coordinate actions. You should call the emergency services on 999 if
you are concerned about your safety or the safety of others and act
immediately on any advice provided. 
• Historic Environment Scotland considers flooding as part of their regular
site assessments. As such, flooding is considered as one of the many factors
which inform the development and delivery of its management and
maintenance programmes. 
• The Scottish Flood Forum is a Scottish charitable organisation that provides
support for those who are affected by, or are at risk of flooding. It provides
flood advice, information, awareness, education and training to individuals
and communities to help reduce the risk of flooding; in partnership with the
local authority, provides support during the recovery process following a flood
incident and aims to support the development of resilient communities.  
Page 278

Page 279

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
117
PUBLIC
4.2 Links to Schedules of Clearance and Repair 
S18 Schedule of Clearance and Repair 
The following are links for each local authority to access schedules of clearance and
repair under Section 18 of the Flood Risk Management (Scotland) Act 2009:
Local
Authority 
Method of
public
access to
the S18
Schedule
Hyperlink or web access
The
Moray
Council
Website www.moray.gov.uk/flooding
The
Highland
Council
Website www.highland.gov.uk/info/1210/environment/81/flooding/5
Page 279

Page 280

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
118
PUBLIC
4.3 Land Use Planning 
Flood risk management actions from national planning policies
AVOID DEVELOPMENT IN MEDIUM TO HIGH RISK AREAS 
a) Planning authorities work in partnership undertaking catchment-wide Strategic
Flood Risk Assessments to inform their development plan allocations in line with
SEPA’s guidance and Land Use Vulnerability. 
b) Planning authorities and SEPA require the submission of flood risk
assessments that accord with SEPA’s Technical Flood Risk Guidance for
Stakeholders, to support planning applications where there is a potential flood risk.
The flood risk assessment should be used to demonstrate as far as possible that
the development will be safe for its lifetime, without increasing flood risk elsewhere
and, where possible, takes opportunities to reduce flood risk overall. 
c) SEPA ensures that its flood risk advice to planning authorities is clear and
appropriate. SEPA, in consultation with planning authorities, undertakes an annual
assessment of planning advice and its contribution to flood risk. 
d) SEPA and planning authorities engage at an early stage of the development
plan process to agree appropriate forms of development to help inform the
preparation and implementation of Strategic Flood Risk Assessments.
REDUCE IMPACTS TO EXISTING BUILDINGS 
a) SEPA, planning authorities and local communities are required to engage at
an early stage of the development plan process to agree the best long term land
uses for areas where relocation, abandonment and/or change of use have been
identified to deliver sustainable flood risk management. Where possible, new land
uses should aim to achieve multiple benefits for local communities such as the
creation of blue / green infrastructure and increased resilience to climate change.
PROTECT AND ENHANCE NATURAL FEATURES THAT HAVE A POSITIVE
IMPACT ON REDUCING OVERALL FLOOD RISK 
a) SEPA and planning authorities are required to engage early in the
development plan process to identify opportunities for the restoration and
protection of natural features which help manage flood risk. Opportunities should
be maximised to achieve multiple benefits such as the development of green / blue
infrastructure and improved place making. Areas of land that may contribute to
flood management should be identified and protected.
Page 280

Page 281

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
119
PUBLIC
NEW DEVELOPMENTS ARE DESIGNED TO ENSURE THAT SURFACE
WATER DRAINAGE DOES NOT INCREASE FLOOD RISK ON OR OFF SITE 
a) SEPA prepares guidance for planning authorities and developers on the use of
surface water hazard maps for land use planning purposes. 
b) Planning authorities support the implementation of Surface Water
Management Plans, developed by the local authorities, through development plan
allocations and policies. Surface Water Management Plans should take account of
development opportunities that could contribute to the reduction of surface water
flood risk. 
c) SEPA engages at an early stage of the development plan process to progress
exemplar projects that demonstrate the potential for land use planning to mitigate
surface water flooding and contribute to wider environmental benefits
NEW DEVELOPMENT IS RESILIENT TO PREDICTED FUTURE CHANGES IN
CLIMATE 
a) Planning authorities ensure that climate change is considered in Strategic
Flood Risk Assessments and Flood Risk Assessments, based upon the best
scientific evidence and the information requirements of planners to make informed
decisions. 
Page 281

Page 282

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
120
PUBLIC
4.4 Supporting Information 
1. Sources of flooding described in the Strategy and this Plan 
The Strategy and this Plan address the risk of flooding from rivers, the coast and
surface water. The risk of flooding from rivers is usually due to rainfall causing a river
to rise above bank level spreading out and inundating adjacent areas. Coastal
flooding is where the risk is from the sea. Sea levels can change in response to tidal
cycles or atmospheric conditions. Over the longer term sea levels and coastal flood
risk may change due to climate change. Surface water flooding happens when
rainwater does not drain away through the normal drainage systems or soak into the
ground, but lies on or flows over the ground instead. 
There can be interactions between these sources of flooding, but for the purposes of
this Plan they are dealt with independently. 
The following aspects of flooding have not been incorporated:
• Groundwater is generally a contributing factor to flooding rather than the
primary source. It is caused by water rising up from underlying rocks or
flowing from springs. 
• Reservoir breaches have been assessed under separate legislation. Further
information and maps can be found on SEPA’s website.
• The Act does not include powers for SEPA or responsible authorities to
assess or manage coastal erosion. SEPA has included consideration of
erosion in the Strategy by identifying areas that are likely to be vulnerable to
erosion and therefore where erosion can exacerbate flood risk. As part of
considering where actions might deliver multiple benefits, SEPA has looked
to see where the focus of coastal flood risk management studies coincides
with areas of high susceptibility to coastal erosion. Subsequent detailed
studies and scheme design will need to consider how coastal flood risk
management actions interact with coastal erosion. The Moray Council has a
policy in relation to erosion whereby it may take action if erosion may
substantially increase flood risk or its assets are at risk. 
Page 282

Page 283

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
121
PUBLIC
• Wave overtopping. The information on coastal flooding in the Strategy is
based on SEPA modelling using still water level predictions. The method
used simplifies the coastal processes and flooding mechanisms at work
during a storm. Wave overtopping cannot be accurately modelled at a
national scale due to the importance of local factors such as prevailing wind
conditions, the depth and profile of the near-shore sea bed or the influence of
any existing defences or management structures. As a result the Strategy
underestimates coastal flood risk in some areas. Conversely, in locations with
wide and flat floodplains, the modelling may overestimate flood risk because
the volumes of water able to inundate an area over a tidal cycle are not taken
into account. Where wave overtopping has been specifically identified as a
concern – but where no further detailed modelling is available – particular
compensation has been made in the selection of appropriate actions to
address coastal flood risk. 
2. Understanding commonly used terms in flood risk management 
Below are explanatory notes for the approach taken in this strategy and commonly
used terms in flood risk management. A glossary of terms is also available. 
• Reference to flood risk. During the development of the Strategy flood risk
has been assessed over a range of likelihoods. For consistency in reporting
information within the Strategy, unless otherwise stated, all references to
properties or other receptors being ‘at risk of flooding’ refer to a medium
likelihood flood (up to a 1 in 200 chance of flooding in any given year). By
exception, references will be made to high or low risk flooding, which should
be taken to mean a 1 in 10 chance/likelihood and 1 in 1000 chance/likelihood
of flooding in any given year respectively.
Likelihood of flooding Return Period
High 10 year
Medium 200 year
Page 283

Page 284

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
122
PUBLIC
Low 1000 year 
• Annual Average Damages have been used to assess the potential economic
impact of flooding within an area. Depending on its size or severity each flood
will cause a different amount of damage to a given area. Annual Average
Damages are the theoretical average economic damages caused by flooding
when considered over a very long period of time. It does not mean that
damage will occur every year: in many years there will be no damages, in
some years minor damages and in a few years major damages may occur.
High likelihood events, which occur more regularly, contribute proportionally
more to Annual Average Damages than rarer events. Within the Flood Risk
Management Strategies Annual Average Damages incorporate economic
damages to the following receptors: residential properties, non-residential
properties, vehicles, emergency services, agriculture and roads. They have
been calculated based on the principles set out in the Flood Hazard Research
Centre Multi-Coloured Handbook (2010). 
• History of flooding. The history of flooding sections of this document report
floods that have occurred up to July 2015.
3. Flood Risk Management Planning Process 
Flood risk management in Scotland aims to manage flooding in a sustainable way.
Sustainable flood risk management considers where floods are likely to occur in the
future and takes action to reduce their impact without moving the problem
elsewhere. It considers all sources of flooding, whether from rivers, the sea or from
surface water. It delivers actions that will meet the needs of present and future
generations whilst also protecting and enhancing the environment. 
The sustainable approach to managing flood risk works on a six year planning cycle,
progressing through the key stages outlined below.
Identifying priority areas at significant flood risk 
Page 284

Page 285

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
123
PUBLIC
The first step to delivering a risk-based, sustainable and plan-led approach to flood
risk management was SEPA’s National Flood Risk Assessment, which was
Findhorn, Nairn and Speyside Local Flood Risk Management Plan 92 June 2016
published in 2011. The assessment considered the likelihood of flooding from rivers,
groundwater and the sea, as well as flooding caused when heavy rainfall is unable to
enter drainage systems or the river network. The likelihood of flooding was examined
alongside the estimated impact on people, the economy, cultural heritage and the
environment. It significantly improved our understanding of the causes and
consequences of flooding, and identified areas most vulnerable to floods. 
Based on the National Flood Risk Assessment, SEPA identified areas where
flooding was considered to be nationally significant. These areas are based on
catchment units as it is within the context of the wider catchment that flooding can be
best understood and managed. These nationally significant catchments are referred
to as Potentially Vulnerable Areas. In Scotland, 243 Potentially Vulnerable Areas
were identified. They are estimated to contain 92% of the total number of properties
at risk. 
A small number of Candidate Potentially Vulnerable Areas were identified after the
National Flood Risk Assessment in light of new information that warranted further
assessment and appraisal. They are included in the flood risk management planning
process. The National Flood Risk Assessment will be updated to inform each
subsequent planning cycle. 
Improving the understanding of flooding 
SEPA developed flood hazard and flood risk maps between 2012 and 2014.
These maps improved our understanding of flooding and helped inform the
subsequent selection of actions to manage flood risk in Potentially Vulnerable Areas.
The flood hazard maps show information such as the extent of flooding, water level,
as well as depth and velocity where appropriate. The flood risk maps provide detail
on the impacts on people, the economy, cultural heritage and the environment. 
In 2012 SEPA also developed an assessment of the potential for natural flood
management. The assessment produced the first national source of information on
where natural flood management actions would be most effective within Scotland.
Page 285

Page 286

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
124
PUBLIC
Flood hazard and flood risk maps and the assessment of the potential for natural
flood management can be viewed on the SEPA website www.sepa.org.uk. 
Identifying objectives and selecting actions 
The objectives and actions to manage flooding will provide the long-term vision and
practical steps for delivering flood risk management in Scotland. 
Working collaboratively with local partnerships, SEPA has agreed the objectives for
addressing the main flooding impacts. Actions that could deliver these agreed
objectives have been appraised for their costs and benefits to ensure the right
combinations are identified and prioritised. The actions considered in the
development of this strategy include structural actions (such as building floodwalls,
restoring flood plains, or clearance and repair works to rivers) and non-structural
actions (such as flood warning, land use planning or improving our emergency
response). Structural and non-structural actions should be used together to manage
flood risk effectively. 
An assessment of the potential for natural flood management was used to help
identify opportunities for using the land and coast to slow down and store water.
Natural flood management actions were recommended in areas where they could
contribute to the management of flood risk. In such instances these actions were put
forward as part of flood protection or natural flood management studies.  
Page 286

Page 287

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
125
PUBLIC
4.5 Acknowledgements 
The Moray Council gratefully acknowledges the cooperation and input that various
parties have provided, including inter alia, the following organisations: 
SEPA 
The Moray Council and The Highland Council acknowledge the inclusion of text
generated by SEPA in preparation of the Findhorn, Nairn and Speyside Flood Risk
Management Strategy. Figures and Maps produced by SEPA for Findhorn, Nairn
and Speyside Flood Risk Management Strategy have been reproduced in the
Findhorn, Nairn and Speyside Local Flood Risk Management Plan with authorisation
from SEPA under SEPA Licence number 100016991 (2015). 
Ordnance Survey 
These reproduced maps are based upon Ordnance Survey material with the
permission of Ordnance Survey on behalf of the Controller of Her Majesty’s
Stationery Office © Crown Copyright. Any unauthorised reproduction infringes Crown
copyright and may lead to prosecution or civil proceedings. SEPA Licence number
100016991 (2015). The Moray Council Licence number 100023422 (2016). 
The Centre for Ecology and Hydrology 
Some features of these reproduced maps are based upon digital spatial data
licensed from the Centre for Ecology and Hydrology © NERC (CEH) and third party
licensors. 
The Met Office 
Data provided by The Met Office has been used by SEPA under licence in some
areas of flood risk information production. ©Crown Copyright (2015), the Met Office. 
The James Hutton Institute 
Data provided to SEPA under license from the James Hutton Institute has been
applied in production of flood risk management information. Copyright © The James
Hutton Institute and third party licensors. 
Page 287

Page 288

Local Flood risk management plans: Findhorn, Nairn and Speyside Local Plan District (LPD 5)
126
PUBLIC
British Geological Survey 
Flood risk information has been derived by SEPA from BGS digital data under
license. British Geological Survey ©NERC 
Local authorities 
Lead authorities acknowledge the provision of flood models and other supporting
data and information from local authorities in Scotland and their collaboration in the
production of flood risk management information. 
Scottish Water 
Moray Council and The Highland Council acknowledge the inclusion of surface water
flooding data generated by Scottish Water in preparation of flood risk information. 
Page 288

Page 289

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 15 NOVEMBER 2022 
SUBJECT: LOCAL FLOOD RISK MANAGEMENT PLAN CYCLE 2
NORTH EAST 2022-2028 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the: 
(i) proposed publication of the Final Report on the North East Local Flood
Risk Management Plan for Cycle 1; and
(ii) proposed publication of the North East Local Flood Risk Management
Plan for Cycle 2. 
1.2 This report is submitted to Committee in terms of Section III (F) (19) of the
Council's Scheme of Administration relating to exercising the functions of the
Council under the Flood Risk Management (Scotland) Act 2009. 
2. RECOMMENDATION 
2.1 It is recommended that Committee agree the Moray Council content of
The Local Flood Risk Management Plan (the Plan) Final Report, for the
North East (NE)  Local Plan District for planning Cycle 1; and ii) the Moray
Council content of the Plan for the NE Local Plan District for planning
Cycle 2. 
3. BACKGROUND 
3.1 The Flood Risk Management (Scotland) Act 2009 (the Act) places a duty on
responsible authorities to manage flood risk on a plan-led, risk based,
sustainable way. As part of this process every six years Moray Council, as a
responsible authority, must provide information to Aberdeenshire Council to
allow them to produce a Local Flood Risk Management Plan for the NE Local
Plan District. This Plan is developed working in partnership with other
authorities including SEPA, Scottish Water, Aberdeenshire Council, Aberdeen
City, Cairngorm National Park Authority and Forestry Scotland and Transport
Scotland. 
3.2 The Plan includes actions to manage flood risk and identifies when these
actions will be undertaken, who is responsible for them and how they will be
Item 7
Page 289

Page 290

funded.  The actions in the Plan are taken from the National Flood Risk
Management Plan, which is published by SEPA.  Every six years SEPA
undertakes a National Flood Risk Assessment, the findings of which are used
to identify areas at significant risk of flooding.  These areas are known as
Potentially Vulnerable Areas (PVAs) and all actions to mitigate flood risk that
are eligible for grant funding from Scottish Government are within a PVA.  All
PVAs and actions to mitigate flooding within them are included in the National
Flood Risk Management Plan. 
3.3 The Plan for the NE Local Plan District for Cycle 1 was agreed by this
Committee on 3 May 2016, (paragraph 6 of the minute refers). The Plan was
published in July 2016. The main actions Moray Council was responsible for
implementing in Cycle 1 are provided in the table below. 
Action  PVA Location
Develop Surface Water
Management Plans
Keith and Buckie
Flood Protection Works Newmill
Maintain Flood Protection
Schemes
Newmill
Flood Protection Studies Portgordon 
3.4 Aberdeenshire is required to report on progress of the Plan twice during the six
year cycle.  An interim report was agreed by this Committee on 4 December
2018, (paragraph 11 of the minute refers).  The main actions delivered by
Moray Council included in this report are provided below. 
• Newmill Flood Protection works complete
• The Surface Water Management Plans (SWMP) for Buckie and Keith
complete
• Coastal Protection study for Portgordon complete. 
Cycle 1 Final Report
3.5   The second report that Aberdeenshire Council is required to publish is a Final
Report on the implementation of the Plan.  The final report measures
performance against the original Plan, which was published in July 2016. The
key outcomes from Cycle 1, delivered by Moray Council since the Interim
Report was agreed by members are:- 
• Continued maintenance of our Floods Schemes
• Updated planning guidance with regards to Drainage and Flooding
• Continued maintenance to reduce wider flood risk as set out in the
Schedule of Clearance and Repair which is published on a yearly basis 
These above actions were delivered on time and within the resources
allocated. 
3.6 The final report highlights that SEPA, due to a Cyber-attack, has not been able
to complete a number of its modelling actions. These actions have commenced
and they will continue into Cycle 2. 
Page 290

Page 291

3.7 An extract of the data, which affects Moray Council area, from the Final report
is provided in Appendix 1.   
Cycle 2 Local Flood Risk Management Plan
3.8 The Plan for Cycle 2 has been developed in partnership with the other
authorities over the last six years and an extract of the data, which affects
Moray Council, is provided in Appendix 2. Aberdeenshire Council are
responsible for the completion of The Plan and its publication. Since the
development of the Plan for Cycle 1 a change has been made to further define
specific areas at risk within a PVA.  These areas are known as Objective
Target Areas (OTAs).  The OTAs for each PVA in Moray are listed in the table
below. 
PVA No PVA Name OTA No OTA Name
02/06/06 Keith and Newmill 444 Newmill 
404 Keith
02/06/01 Portgordon and Buckie  398  Portgordon
455 Buckie and Portessie 
3.9 The actions identified for each OTA were agreed by this Committee on 1
December 2020 (Paragraph 20 of the minute refers).  These actions are
provided in the table below. 
OTA Action Type
Portgordon Strategic mapping improvements
Sewer flood risk assessment 
Flood defence maintenance 
Flood warning maintenance
Adaptation Plan
Keith Flood warning maintenance
Surface Water Management Plan implementation
Newmill (Keith) Flood defence maintenance 
Flood warning maintenance
Buckie and Portessie Flood scheme or works implementation Coastal
Flood scheme or works implementation Surface Water
Community engagement
Sewer flood risk assessment 
Surface Water Management Plan implementation
Strategic mapping improvements
Flood warning maintenance 
3.10 Following the agreement of the actions a joint consultation was undertaken by
SEPA and Aberdeenshire Council on both The Plan and the National Flood
Risk Management Plan. Due to the cyber-attack, which SEPA suffered in
December 2020, this consultation was delayed by 6 months and took place on
31 July 2021 and closed on 31 October 2021. Members agreed Moray
Page 291

Page 292

Council’s response to the consultation at Economic Growth, Housing and
Environmental Sustainability Committee on 24 August 2021, (paragraph 10 of
the minute refers). Following the closure of the consultation, Moray Council
received 4 responses to actions which affect Moray Council. The concerns
were with regard to:- 
• Maintenance of the Cullen Sea Defence. Moray Council currently monitor
this defence structure and take appropriate action when required. The sea
defences here are also included as an Adaptation Plan. 
• Flooding along the River Isla Downstream of Newmill. During Cycle 2
Moray Council will look to promote awareness and self-help within this
area. 
3.11 The National Flood Risk Management Plan for Cycle 2 was published by SEPA
in December 2021.  The Plan for the NE Local Plan District has been drafted in
line with the National Plan and in consultation with our partner organisations. 
The Plan has a total of 138 actions across 40 OTAs and 15 of these actions
are within 4 OTAs in the Moray area. 
3.12 The majority of actions will be undertaken by the Council’s Flood Team using
the existing revenue allocation.  However, subject to the observations at 3.14
below, projects that require significant spend such as the development and
construction of a flood protection scheme will be subject to 80% grant funding
from Scottish Government.  How actions will be funded is identified in
Appendix 2. 
3.13 The current Flood Risk Management revenue budget and staffing levels are
sufficient to undertake the actions not subject to grant funding from Scottish
Government, identified in the Plan for the next six years, 
3.14 Works that are subject to grant funding from Scottish Government have been
included in the Plan.  However, there is a significant gap in Flood Risk
Management funding due to increased costs of works committed to in Cycle 1. 
It is currently unclear how much funding will be available for works in Cycle 2. 
Prioritisation of works will not be undertaken until issues relating to the funding
gap have been resolved between COSLA and Scottish Government.  The
works that are subject to grant funding in Cycle 2 are provided in the table
below.   
Buckie and Portessie: Portessie Coastal Flood Defence Scheme 
Buckie and Portessie: Buckie Surface Water Management Flood Scheme 
3.15 The Plan has been agreed by Scottish Water and SEPA and will be the subject
of a report to Aberdeenshire Council for agreement on 1 December 2022. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Flood Risk Management is a key priority in the 10 year plan “Building a
better future for our children and young people in Moray.” 
Page 292

Page 293

(b) Policy and Legal
Under the Flood Risk Management (Scotland) Act 2009, the Council has
a statutory duty to implement the Actions from the Local Flood Risk
Management Plans. The Council can do works not included in the Plans
that will manage flood risk, provided it does not affect the delivery of
those Actions in the Plans. 
(c) Financial implications
The proposed Plan has financial implications on our capital spend if the
schemes are prioritised and funded by Scottish Government. The 10
year Capital Plan currently has allowance for these schemes from 2026
to 2028. 
(d) Risk Implications
There are no risks associated with the recommendations in this report. 
(e) Staffing Implications
The proposed Plan can be delivered from within the current resources
within the Flood Risk Management Team. 
(f) Property
The Plan currently does not have an implications on the Council’s
property portfolio. However, it should be noted that if the proposed
schemes are progressed this position may change, as any new scheme
would become the property of Moray Council. Progression of proposed
schemes would be the subject of a separate report to a future meeting of
this committee. 
(g) Equalities/Socio Economic Impact
There are no equalities implications arising from this report. 
(h) Climate Change and Biodiversity Impacts
The plan has significant impacts on our aims to manage the challenges
of climate change. The action to produce Adaptation Plans will allow
Moray Council to better use resource in the future to manage flooding.
The Plan also has particular reference to planning policy which will be
used to help ensure that development is designed in such a way to
manage the risk of flooding from climate change. 
(i) Consultations
Depute Chief Executive (Economy Environment and Finance), Head of
Environment and Commercial Services, Chief Financial Officer, Legal
Services Manager, Equalities Officer and Lissa Rowan, Committee
Services Officer have been consulted and their comments incorporated
into the report. 
5. CONCLUSION 
5.1 The majority of the actions identified in the Plan for Cycle 1 are complete
and details are provided in the Final Report. 
Page 293

Page 294

5.2 Actions identified for Cycle 2 in the National Flood Risk Management Plan
must be included in the Plan. The Plan provides details of when the
actions will be undertaken, how they will be funded (noting the current
funding issues to be resolved), who is responsible for implementing them
and how they will be coordinated and monitored. 
5.3 Aberdeenshire Council has a Statutory Duty to publish the Plan for Cycle
2 on or before 22 December 2022. 
Author of Report:  Will Burnish, Senior Engineer Flood Risk Management 
Background Papers: 
Ref: SPMAN-524642768-801 
Page 294

Page 295

APPENDIX 1 
Page 1 
Assessment of Progress
This section sets out an assessment of the progress towards implementing the actions set out in the
North East Local Plan District – Local Flood Risk Management Plan. 
There are actions that apply across the whole of the NELPD and actions that are specific to each of
the 23 Potentially Vulnerable Areas (as defined under Section 13 of the Act) in the North East LPD,
which are shown below in Figure 1. 
Figure 1: The North East Local Plan District with Potentially Vulnerable Areas identified
Item 7
Page 295

Page 296

APPENDIX 1 
Page 2 
Reproduced from North East Local Plan District Flood Risk Management Strategy, SEPA (December 2015)
A progress summary of the actions set out in the Plan is shown overleaf in Figure 2.  Progress is
shown using a traffic light system based on data collected during February 2022, where each item is
marked as Red, Amber or Green (RAG) to describe the status of the action as follows:
Green – Action has been completed.
Amber – Action has commenced but has not progressed as far as envisaged in the Plan.
Red – Action has not commenced.
The distribution of actions by Potentially Vulnerable Area is shown in Table 4. Further detail on
specific actions can be found in the relevant Potentially Vulnerable Area section within Chapter 5.
*Note: N/A is used where there is no formal Flood Protection Scheme or flood warning scheme present.
Page 296

Page 297

APPENDIX 1  
Page 3mailto:       
PVA Flood
protections
scheme/work 
Natural flood
management
works 
New
flood
warning 
Flood
protection
study 
Natural flood
management
study 
Surface water
plan/study 
Strategic
mapping and
modelling 
Maintain flood
protection
scheme* 
Maintain flood
warning 
Flood
forecasting 
Property level
protection
scheme 
Community
flood action
groups 
Self help 
Awareness
raising 
Maintenance 
Site protection
plans 
Emergency
plans/response 
Planning
policies 
06/01 Portgordon    G  G A  G G   A G G  G G
06/02 Portsoy       G   G   G G G  G G
06/03 Banff       A  G G   G G G  G G
06/04 Macduff       A  G G   G G G  G G
06/05 Fraserburgh
and Rosehearty     
A R  G G   G G G  G G
06/06 Newmill G     G G G G G  G A G G  G G
06/07 Turriff       G  G G   G G G  G G
06/08 Peterhead   G   A G   G   G G G  G G
06/09 Methlick          G   G G G  G G
06/10 Huntly G     A G G G G   G G G  G G
06/11 Insch    G   R   G   G G G  G G
06/12 Ellon    G   G   G   G G G  G G
06/13 Inverurie and
Kintore   
G  A A  G G   G G G  G G
06/14 Heugh-head          G   G G G A G G
06/15 Bridge of Don   G A  A A  G G G  G G G  G G
06/16 Denmore    G  A G G  G G  G G G  G G
06/17 Westhill      A G   G   G G G  G G
06/18 Deeside   G A  A G G G G G A G G G  G G
06/19 Peterculter A    G A G   G G  G G G  G G
06/20 Aboyne      A G  G G   G G G  G G
06/21 Banchory and       
Torphins      
G  G G   G G G  G G
06/22 Ballater    G   G  G G  G G G G  G G
06/23 Stonehaven A  G G  A G G G G  G G G G  G G 
Page 297

Page 298

APPENDIX 1 
Page 4 
1 Progress with PVA-specific Actions
This chapter is focused on the actions being taken to manage flood risk in the Potentially
Vulnerable Areas. For each Potentially Vulnerable Area, background information including a
summary of flood impacts and the actions to manage flooding is presented. Additional
information on flooding within each Potentially Vulnerable Area is available within the North
East Flood Risk Management Strategy, available on the SEPA website here -
http://apps.sepa.org.uk/FRMStrategies/
The background information sets the scene for the planned actions to manage flooding that
have been prioritised for delivery between 2016 and 2022. The Potentially Vulnerable Area
level action tables set out the flood management objective that is to be achieved, provide a
description of the action, identify who will be responsible for the delivery and
implementation and a timetable of when the actions will be undertaken. The Local Plan
District wide actions noted in Section 4 apply to all Potentially Vulnerable Areas.
This information is provided for each of the 23 Potentially Vulnerable Areas (in cycle 1). Each
Potentially Vulnerable Area has a separate sub-section with each sub-section following the
same format.
The flood management objectives are the shared aims for managing flooding. Actions
describe where and how flood risk will be managed. Objectives and actions have been set by
SEPA and agreed by the flood risk management responsible authorities following
consultation.
Many organisations, such as Scottish Water and energy companies, actively maintain and
manage their own assets including the risk from flooding. Where known, these actions are
described here. Scottish Natural Heritage and Historic Environment Scotland work with site
owners to manage flooding where appropriate at designated environmental and/or cultural
heritage sites. These actions are not detailed further in the Local Flood Risk Management
Plan. 
Page 298

Page 299

APPENDIX 1 
Page 5 
1.1 North East Plan District
• Portgordon (Potentially Vulnerable Area 06/01) 
Local Plan District  Local authority  Main catchment 
North East  Moray Council Banff Coast 
Summary of Progress for Portgordon 
There are fewer than 10 residential and non-residential properties at risk of flooding in this PVA. The Annual
Average Damages are approximately £8,500. The majority of these damages are attributed to surface water
flooding, however, it is recognised that wave overtopping causes flooding to a number of properties in Portgordon
and Buckie. 
Further information can be found in NELFRMP under PVA 06/01.
https://www.aberdeenshire.gov.uk/media/17347/pva-06_01-portgordon.pdf 
Key progress:
Since the NELFRMP was published in May 2016, a flood protection study has been undertaken for Portgordon. 
The findings of this study will be taken forward for consideration in the NELFRMP for Cycle 2.  A high level Surface
Water Management Plan has been undertaken for Moray, in which Buckie is a priority area.  Any actions to
mitigate flooding identified in this Plan will be taken forward for consideration in Cycle 2 
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from North East Flood Risk Management
Strategy, SEPA (December 2015) 
Page 299

Page 300

APPENDIX 1 
Page 6 
Overview of actions to manage flooding in Portgordon 
PVA  Flood protections
scheme/works 
Natural flood
management works 
New
flood warning 
Flood protection study 
Natural flood
management study 
Surface water
plan/study 
Strategic mapping and
modelling 
Maintain flood
protection scheme* 
Maintain flood
warning 
Flood forecasting 
Property level
protection scheme 
Community flood
action groups 
Self help 
Awareness raising 
Maintenance 
Site protection plans 
Emergency
plans/response 
Planning policies 
06/01    G  G A  G G   A G G  G G 
Summary of progress of actions to manage flood risk in Portgordon (PVA 06/01) 
Action Status
(Red;
Amber;
Green)
Description Delivery
Lead
Planned
Dates
Progress  Future Actions
Flood protection
study
G Flood study for Portgordon to investigate
coastal flooding, including wave action. 
Moray
Council
2019 The flood study for
Portgordon is complete. 
No further action required. 
Surface water
plan/study
G Surface Water Management Plan for the
Portgordon/Buckie area will be developed
by Moray Council. 
Moray
Council
2019 A high level Surface Water
Management Plan was
completed in 2017.   
Additional investigation will
be undertaken in identified
hotspots.
Strategic mapping
and modelling
A SEPA will be seeking to develop the flood
hazard mapping in the Banff to
Lossiemouth area to improve
understanding of the coastal flood risk.
SEPA 2018 Following the establishment of
a coastal flood hazard map
development framework and
characterisation of the
coastline, several projects are
It is intended to complete
this action in 2019. 
Page 300

Page 301

APPENDIX 1 
Page 7 
currently underway at this
location: 
• Development of a national
coastal joint probability
dataset; 
• Update to the UK design
extreme sea level dataset; 
• Coastal modelling and
mapping project for north-
east Scotland. 
These projects will collectively
enable the revision of flood
mapping for the coastline
from Scrabster to Arbroath
including the Orkney Islands. 
Strategic mapping
and modelling
G Scottish Water will undertake modelling of
the Buckie sewer catchment. 
Scottish
Water
2019 The Scottish Water
assessment of flood risk within
the sewer catchment has been
completed. The assessment
helps to improve knowledge
and understanding of surface
water flood risk 
Maintain flood
warning
G SEPA will Continue to maintain the
'Portgordon to Cullen' flood warning area
which is part of the Moray Firth coastal
flood warning scheme
SEPA Ongoing SEPA has continued to operate
the flood warning service 
SEPA will continue to
operate the flood warning
service. 
Flood forecasting G The Scottish Flood Forecasting Service is a
joint initiative between SEPA and the Met
Office that produces daily, national flood
SEPA Ongoing SEPA continues to provide
flood forecasting. 
Page 301

Page 302

APPENDIX 1 
Page 8 
guidance statements which are issued to
Category 1 and 2
Responders. The flood guidance
statements provide an assessment of the
risk of flooding for a five day period
allowing responders time to put
preparations in place to reduce the impact
of
flooding. 
Self help A Everyone is responsible for protecting
themselves and their property from
flooding. Property and business owners
can take simple steps to reduce damage
and disruption to their homes and
businesses should flooding happen. This
includes preparing a flood plan and flood
kit, installing
property level protection, signing up to
Floodline and Resilient Communities
initiatives, and
ensuring that properties and businesses
are insured against flood damage.
Propert
y
owners
Ongoing SEPA continues to assist
members of the public to sign
up to Floodline. 
Moray Council has not
received any requests for
assistance from property
owners in this area.
Moray Council has not
received any requests for
assistance from property
owners in this area.
Awareness raising G Moray Council will seek opportunities to
raise awareness of flood risk and actions
that prepare individuals, homes and
businesses as described in the Act.
Respons
ible
Authorit
ies
Ongoing SEPA’s principle awareness
raising approaches have been
through:
1. Direct campaigning and
general awareness raising.
2. Education and tools.
3. Partnership delivery
development. 
Moray Council has consulted
with the public in relation to
SEPA will continue to raise
awareness of flood risk
through direct campaigning,
general awareness raising,
developing education and
engagement tools, creating
new partnerships and
improving its flood
forecasting and warning
services (e.g. Scottish Flood
Forecasting Service and
Page 302

Page 303

APPENDIX 1 
Page 9 
the Portgordon Flood
Protection Study. 
Floodline).  This will
continue with many of the
actions reported for the
interim progress summary. 
Further information is
contained within SEPA’s
Flood Warning Development
Framework, published in
2017 and for the period
2017 to 2021.   
Raising Awareness will form
part of each of the 3 key
themes identified: 
• Aim 1: Maintenance of
existing and delivery of new
flood warning schemes.
• Aim 2: Development and
innovation. 
• Aim 3: Engagement with
partners and customers. 
Moray Council will
undertake additional
awareness raising activities
as and when required.
Maintenance  G Local authorities have a duty to assess
watercourses and carry out clearance and
repair works where such works would
substantially reduce flood risk. Moray
Council has a schedule of clearance and
repair, which identifies routine
Moray
Council,
asset /
land
manage
rs
Ongoing Moray Council inspects flood
management assets within its
region according to an
inspection schedule.  This
schedule is reviewed annually
to ensure resources are
Moray Council will continue
with its programme of
clearance and repair work,
which is reviewed annually. 
Page 303

Page 304

APPENDIX 1 
Page 10 
maintenance and repairs to address areas
known to be at risk of flooding.
targeted at the areas at
greatest risk. 
Emergency
plans/response
G Providing an emergency response to
flooding is the responsibility of many
organisations, including local authorities,
the emergency services and SEPA. 
Categor
y 1 and
2
Respon
ders
Ongoing SEPA continues to support
emergency planning. 
Moray Council Emergency
Planners have in place and
maintain Emergency Plans for
all contingencies 
Moray Council’s emergency
plan is reviewed and
updated when required. 
Planning Policy  G Scottish Planning Policy and accompanying
Planning Advice Notes set out Scottish
Ministers’ priorities for the operation of
the planning system and for the
development and use of land in terms of
flood risk management.
Planning
Authorit
y
Ongoing Moray Council, as a Planning
Authority, ensures that new
developments satisfy relevant
guidance and policies on
flooding and drainage. 
Continue to consider flood
risk when determining
planning applications.
Ensure final version of
emerging 2020 Local Plan
maintains robust policy to
avoid new development in
areas that are at risk of
flooding or would increase
flood risk elsewhere, and
encourages the most
sustainable approach to
managing surface water. 
Page 304

Page 305

APPENDIX 1 
Page 11 
• Newmill (Potentially Vulnerable Area 06/06) 
Local Plan District  Local authority  Main catchment 
North East  Moray Council River Deveron 
Summary of Progress for Newmill 
There are approximately 13 residential and fewer than 10 non-residential properties at risk of flooding. The Annual
Average Damages are approximately £24,000. These damages are evenly distributed between surface water and
river flooding. 
Since the NELFRMP was published in May 2016, a flood protection scheme for Newmill has been constructed and
this scheme is now operational.  This scheme provides protection from surface water runoff to eighteen properties
that were previously at risk of flooding.  A high level Surface Water Management Plan has been undertaken for
Moray, in which Keith is a priority area.  Any actions to mitigate flooding identified in this plan will be taken
forward for consideration in Cycle 2.
Further information can be found in NELFRMP under PVA 06/06.
https://www.aberdeenshire.gov.uk/media/17341/pva-06_06-newmill.pdf 
Key progress:
• Moray Council have continued to main the flood scheme including ditch clearance and sediment clearance  © Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from North East Flood Risk Management
Strategy, SEPA (December 2015) 
Page 305

Page 306

APPENDIX 1 
Page 12 
Overview of actions to manage flooding in Newmill 
PVA  Flood protections
scheme/works 
Natural flood
management works 
New
flood warning 
Flood protection study 
Natural flood
management study 
Surface water
plan/study 
Strategic mapping and
modelling 
Maintain flood
protection scheme* 
Maintain flood
warning 
Flood forecasting 
Property level
protection scheme 
Community flood
action groups 
Self help 
Awareness raising 
Maintenance 
Site protection plans 
Emergency
plans/response 
Planning policies 
06/06 G     G G G G G  G A G G  G G 
Summary of progress of actions to manage flood risk in Newmill (PVA 06/06) 
Action Status
(Red;
Amber;
Green)
Description Delivery
Lead
Planned
Dates
Progress in Delivery, including
key deliverables and dates
Revised dates and planned
actions to complete /
address delay
Flood protection
Scheme
G Moray Council will construct a
flood protection scheme in
Newmill to address surface water
flooding issues. The scheme
includes a network of ditches, a
cascade, flood walls and a
replacement bridge. 
Moray
Council
2016 -
2021
The Newmill Flood Protection
Scheme was completed in
December 2016 and is now
operational. 
No further action required. 
Surface water
plan/study
G Moray Council is developing a
Surface Water Management Plan
for the Keith/Newmill area. 
Moray
Council
2019 Moray Council completed a
Surface Water Management Plan
for Keith / Newmill in 2017.   
Actions identified in the
Surface Water Management
Plan will be taken forward
Page 306

Page 307

APPENDIX 1 
Page 13 
for inclusion in the LFRMP
for Cycle 2. 
Strategic mapping
and modelling
G Scottish Water will undertake
modelling of the Keith sewer
catchment. 
Scottish
Water
2020 The Scottish Water assessment of
flood risk within the sewer
catchment has started. The
assessment will improve
knowledge and understanding of
surface water flood risk. 
On track to deliver within
agreed LFRMP timescales. 
Maintain Flood
Protection Scheme
G Moray Council will continue to
maintain the Newmill Flood
Protection Scheme, including
Phase 2, once completed.
Moray
Council
Ongoing Moray Council has continued to
maintain the Newmill Flood
Protection Scheme. Phase 2 was
included in January 2017.
Moray Council will continue
to maintain this scheme.
Maintain flood
warning
G SEPA will continue to maintain the
'Keith' flood warning area which is
on the River Isla and forms part of
the Deveron River flood warning
scheme
SEPA Ongoing SEPA has continued to operate
the flood warning service 
SEPA will continue to
operate the flood warning
service. 
Flood forecasting G The Scottish Flood Forecasting
Service is a joint initiative between
SEPA and the Met Office that
produces daily, national flood
guidance statements which are
issued to Category 1 and 2
Responders. The flood guidance
statements provide an assessment
of the risk of flooding for a five day
period allowing responders time to
put preparations in place to reduce
the impact of
flooding. 
SEPA Ongoing SEPA continues to provide flood
forecasting. 
Page 307

Page 308

APPENDIX 1 
Page 14 
Community Flood
Action Group
G Newmill Community Association
has worked with Moray Council,
and tenants to reduce the impact
of surface water flooding. 
Community Ongoing Newmill Community Association
and Moray Council worked
together to keep local residents
informed during the construction
of the Newmill Flood Protection
Scheme
Moray Council will continue
to work with this group on
request.
Self help A Everyone is responsible for
protecting themselves and their
property from flooding. Property
and business owners can take
simple steps to reduce damage and
disruption to their homes and
businesses should flooding
happen. This includes preparing a
flood plan and flood kit, installing
property level protection, signing
up to Floodline and Resilient
Communities initiatives, and
ensuring that properties and
businesses are insured against
flood damage.
Property
owners
Ongoing SEPA continues to assist
members of the public to sign up
to Floodline. 
Moray Council has not received
any requests for assistance from
property owners in this area. 
Awareness raising G Moray Council will seek
opportunities to raise awareness of
flood risk and actions that prepare
individuals, homes and businesses
as described in the Act.
Responsible
Authorities
Ongoing SEPA’s principle awareness
raising approaches have been
through:
1. Direct campaigning and
general awareness raising.
2. Education and tools.
3. Partnership delivery
development. 
Newmill Community Association
and Moray Council worked
together to keep local residents
SEPA will continue to raise
awareness of flood risk
through direct campaigning,
general awareness raising,
developing education and
engagement tools, creating
new partnerships and
improving its flood
forecasting and warning
services (e.g. Scottish Flood
Forecasting Service and
Floodline).  This will
Page 308

Page 309

APPENDIX 1 
Page 15 
informed during the construction
of the Newmill Flood Protection
Scheme 
continue with many of the
actions reported for the
interim progress summary. 
Further information is
contained within SEPA’s
Flood Warning Development
Framework, published in
2017 and for the period
2017 to 2021.   
Raising Awareness will form
part of each of the 3 key
themes identified: 
• Aim 1: Maintenance of
existing and delivery of new
flood warning schemes.
• Aim 2: Development and
innovation. 
• Aim 3: Engagement with
partners and customers. 
Moray Council will
undertake additional
awareness raising activities
as and when required.
Maintenance  G Local authorities have a duty to
assess watercourses and carry out
clearance and repair works where
such works would substantially
reduce flood risk. Moray Council
has a schedule of clearance and
repair, which identifies routine
Moray
Council,
asset / land
managers
Ongoing Moray Council inspects flood
management assets within its
region according to an inspection
schedule.  This schedule is
reviewed annually to ensure
resources are targeted at the
areas at greatest risk.
Moray Council will continue
with its programme of
clearance and repair work,
which is reviewed annually. 
Page 309

Page 310

APPENDIX 1 
Page 16 
maintenance and repairs to
address areas known to be at risk
of flooding. 
Emergency
plans/response
G Providing an emergency response
to flooding is the responsibility of
many organisations, including local
authorities, the emergency
services and SEPA. 
Category 1
and 2
Responders
Ongoing SEPA continues to support
emergency planning. 
Moray Council Emergency
Planners have in place and
maintain Emergency Plans for all
contingencies 
Moray Council’s emergency
plan is reviewed and
updated when required. 
Planning Policy  G Scottish Planning Policy and
accompanying Planning Advice
Notes set out Scottish Ministers’
priorities for the operation of the
planning system and for the
development and use of land in
terms of flood risk management.
Planning
Authority
Ongoing Moray Council, as a Planning
Authority, ensures that new
developments satisfy relevant
guidance and policies on flooding
and drainage. 
Continue to consider flood
risk when determining
planning applications.
Ensure final version of
emerging 2020 Local Plan
maintains robust policy to
avoid new development in
areas that are at risk of
flooding or would increase
flood risk elsewhere, and
encourages the most
sustainable approach to
managing surface water. 
Page 310

Page 311

OFFICIAL#
Flood risk management plans publication spreadsheet
1.  Guidance notes on how to use this spreadsheet
1.1  This spreadsheet contains the information used to populate the target area datasheets for final publication of the flood risk management plans in
December 2021. It also includes additional information on coordination of actions and opportunities for joint working which can be used by local
authorites when preparing the local flood risk management plans (LFRMPs).
1.2  Columns with headers highlighted in blue were used for the FRM Plans publication.
1.3  Following the consultation, SEPA has only altered the FRM Plans based on responsible authorities' consultation responses. No significant changes
were made without consulting with the respective responsible authority. Public responses were not used to make alterations to the plans. SEPA will
use the public responses to inform the next cycle national flood risk assessment and FRM Plans and will share the responses with local authorities for
consideration in the LFRMPs.1.4  Columns with headers highlighted in green were not published in the FRM Plans but may help inform the LFRMPs. These columns have not been
changed since the public consultation. Consultation responses suggesting/requesting changes to be made to these sections, either by the public or by
responsible authorities, have NOT been reflected in these columns of this spreadsheet. These consultation responses will be made available by SEPA
for local authorities to consider when preparing their LFRMPs.
1.5  Please note that a "Flood risk management review" action has been added to every target area without a cycle 2 action to allow the target area
datasheet to read well. These actions also act as a reminder of the national actions which will be carried out in cycle 2. The local detail for these
actions explains 'No local actions specific to this target area have been identified yet. There are national actions planned that will cover this area,
including an update to SEPA's surface water flood maps and an update to the national flood risk assessment. These, along with other actions that are
carried out across the whole local plan district covering this area, will help to manage flood risk in the long term. The need for actions for this area will
# OFFICIAL
Item 7
Page 311

Page 312

OFFICIAL#
# OFFICIALPage 312

Page 313

OFFICIAL#
Target area ID Target area name Number of cycle 2 actions Number of cycle 3 actions
1 Hamilton west 3 0
2 Vale of Leven 5 0
3 Barrhead 2 0
4 Bishopbriggs west 4 0
5 Bishopbriggs east 4 0
6 Bishopton 3 0
7 Bowling 2 0
9 Giffnock and Merrylee 3 0
10 Holytown and New Stevenston 2 0
11 Johnstone and Linwood 6 0
12 Paisley east 6 0
13 Renfrew 5 0
14 Kirkmichael 1 1
15 Kilbarchan 5 0
16 Sorn 2 0
17 Catrine 3 1
18 Drongan 2 0
19 Cumnock 1 1
20 Kilmarnock 6 0
21 Irvine 6 0
22 Irvine Coastal 2 1
23 Brodick 4 1
24 Lamlash 6 1
25 Whiting Bay 4 0
26 Helensburgh 6 2
27 Prestwick south 7 0
28 Prestwick north 8 0
29 Crossford (South Lanarkshire) 2 0
30 Kirkfieldbank 1 0
31 Ecclefechan 1 0
33 Eaglesfield 1 0
34 Kirkton 1 0
35 Bridge of Dee 1 0
36 Castle Douglas 1 0
37 Cargenbridge 3 0
38 Locharbriggs 1 0
39 Dumfries 8 1
40 Howwood 2 0
41 Cathcart & Shawlands 6 0
42 Castlemilk west 3 0
46 Kelvinside 5 0
47 Glasgow east end 3 1
49 Carntyne 3 0
50 Glasgow west end 6 0
51 Yoker 7 0
52 Drumchapel 3 0
53 Old Kilpatrick 3 2
54 Clydebank 1 1
55 Hillington and Cardonald 5 0
56 Pollok 5 0
#OFFICIALPage 313

Page 314

OFFICIAL#
57 Thornliebank 6 0
58 Newton Mearns 3 0
59 Busby 1 2
60 Cumbernauld 4 0
61 Dumbarton 11 0
62 Duntocher and Hardgate 1 1
64 Greenock 5 3
65 Houston and Crosslee 4 0
66 Inchinnan 2 0
67 Kilcreggan 2 0
68 Auchinleck 1 1
69 Springholm 2 0
70 Sorbie 1 0
71 Ayr 6 2
72 Ayr east 3 1
73 Ayr south east 6 0
74 Ayr Doon 4 0
75 Crosshouse 2 1
76 Dalry 4 0
77 Dalrymple 2 0
78 Girvan 4 2
79 Kilsyth 6 0
80 Kilwinning and Dalgarven 3 0
81 Kirkintilloch South and Lenzie 4 1
82 Larkhall 1 2
83 Lochwinnoch 3 0
84 Milngavie 6 2
86 Motherwell 5 0
87 Newarthill 1 1
88 Rothesay and Port Bannatyne 4 0
89 Port Glasgow east 3 3
90 Port Glasgow west 7 1
91 Queenzieburn 1 1
93 Uddingston 3 1
94 Wishaw south 1 1
95 Barrhill 1 1
96 Dalmellington 1 0
97 Kilbirnie and Glengarnock 6 0
98 Lennoxtown 3 0
99 Quarrier's Village 3 0
100 Sandbank 5 0
101 Strathaven 1 0
102 Airdrie 3 0
103 Bearsden 6 0
104 Bellshill 1 2
105 Cardross 4 0
106 Coatbridge 2 2
107 Dunoon 8 0
108 East Kilbride east 2 0
109 East Kilbride west 2 0
110 Erskine 2 0
111 Garelochhead 3 0
#OFFICIALPage 314

Page 315

OFFICIAL#
112 Hamilton east 4 0
113 Kilmacolm 2 2
114 Symington 1 2
115 Coulter 1 0
116 Kilchattan Bay 1 1
117 Gourock 7 0
118 Powfoot and Cummertrees 3 0
119 Millport 9 0
120 Newmilns 4 1
121 Saltcoats and Stevenston 4 0
122 Stewarton 3 1
123 Troon 6 0
124 West Kilbride 1 3
125 Southerness 4 0
126 Garlieston 3 0
127 Carsphairn 3 0
128 Carsethorn 3 0
129 Annan 5 1
130 Creetown 3 1
131 Dalbeattie 3 3
132 Gretna 3 0
133 Kirkconnel 6 0
134 Kirkcudbright 3 0
135 Langholm 4 0
136 Moffat 3 0
137 Moniaive 1 3
138 New Cummock 3 0
139 Newcastleton 5 0
140 Newton Stewart 4 1
141 Portpatrick 4 1
142 Stranraer 4 0
143 Port William 3 0
144 Isle of Whithorn 3 0
146 Inverkip 2 1
147 Kilmaurs 2 1
148 Largs north 5 2
149 Largs south 2 1
150 Lockerbie 1 0
151 Lesmahagow 1 2
152 Strathblane 4 0
153 Galston 4 1
154 Darvel 3 1
155 Fairlie 3 0
156 Easterhouse south 2 0
157 Kirkintilloch north 5 2
158 Possil Park 2 0
159 Milton 1 1
160 Summerston 1 1
161 Chapelhall 1 1
162 Straiton 1 1
163 Lochmaben 1 0
164 Patna 1 0
#OFFICIALPage 315

Page 316

OFFICIAL#
165 Paisley west 4 0
167 Springburn 2 0
169 Allanton 1 0
171 Strathyre 5 0
172 Blair Atholl 3 0
173 Dunshalt 2 1
174 Marykirk 1 0
175 Pitscottie and Kemback 3 0
177 South Alloa 2 0
179 Spittalfield 3 2
182 Weem 2 2
183 Aberfeldy 5 1
184 Aberfoyle 6 0
185 Airth 4 0
186 Alloa 5 0
187 Almondbank 2 1
188 Alva 7 0
189 Alyth 3 0
190 Arbroath 12 1
191 Armadale 1 0
192 Auchenblae 1 0
193 Auchtermuchty 3 1
194 Bankfoot 1 0
195 Bannockburn 3 0
196 Bathgate 2 1
197 Blackburn 2 0
198 Blackford 3 0
199 Blairgowrie and Rattray 4 0
200 Bo'ness 5 1
201 Bonnybridge 2 0
202 Bonnyrigg and Lasswade 3 0
203 Brechin 7 0
204 Bridge of Allan 7 0
205 Bridge of Earn 5 1
206 Broxburn 6 1
207 Cairneyhill 6 1
208 Callander 6 0
209 Cardenden 6 0
210 Carnoustie 7 0
211 Carron and Carronshore 9 0
212 Cockenzie and Port Seton 5 0
213 Comrie 7 2
214 Coupar Angus 3 0
215 Cowdenbeath 4 0
216 Crail 1 1
217 Crossford 3 0
218 Cupar 4 1
219 Dalkeith 3 0
220 Denny and Dunipace 3 0
221 Dollar 6 0
222 Dunbar 4 0
223 Dunblane 5 0
#OFFICIALPage 316

Page 317

OFFICIAL#
224 Dunfermline 5 1
225 Dunkeld and Birnam 4 2
226 East Wemyss 4 1
227 Eyemouth 8 1
228 Falkirk 6 0
229 Fauldhouse 2 0
230 Forfar 3 0
231 Glenrothes, Markinch and
Kinglassie
4 0
232 Grangemouth west 8 0
233 Haddington 5 1
234 Culross 6 0
235 Invergowrie 3 0
236 Inverkeithing 3 1
237 Kincardine 4 2
238 Kingskettle and Kettlebridge 2 0
239 Kinross 6 0
240 Kirkcaldy 6 1
241 Kirriemuir 5 0
243 Larbert and Stenhousemuir 6 0
244 Leven 6 0
246 Linlithgow 7 0
247 Luncarty 3 0
248 Menstrie 8 1
249 Methven 2 0
250 Monifieth 10 0
251 Montrose and Ferryden 6 0
252 Newburgh 5 1
253 Perth 11 2
254 Pitlochry 5 1
255 Scone 5 0
256 Springfield 2 0
257 St Andrews 7 0
258 Stirling 7 0
260 Tillicoultry 9 0
262 Grangemouth east 7 0
263 Dalkeith (north east) 2 0
264 Edinburgh west 5 1
265 Edinburgh north 6 1
266 Edinburgh Water of Leith 8 0
267 Edinburgh Braid Burn 8 1
268 Edinburgh Niddrie Burn and
Burdiehouse
6 0
269 Broughty Ferry 9 0
270 Dundee 11 0
271 Broughton 2 2
272 Fettercairn 2 0
273 Dalguise 2 1
274 Lindean 4 0
275 Eddleston 2 1
276 Bonchester Bridge 4 1
278 Upper Ettrick 5 0
#OFFICIALPage 317

Page 318

OFFICIAL#
281 Biggar 2 0
282 Blackridge 1 3
284 Ceres 1 1
285 Coldstream 3 1
286 Cumbernauld east 1 1
287 Earlston 4 2
288 Freuchie 2 0
289 Galashiels 6 0
290 Hawick 9 0
291 Innerleithen 5 1
292 Jedburgh 6 0
293 Kelso 3 0
295 Livingston and Mid Calder 2 1
296 Loanhead 2 0
297 Longniddry 3 0
298 Lower Largo and Lundin Links 2 1
300 Newtongrange 2 0
301 Melrose 2 1
302 Methil and Buckhaven 5 1
303 Milnathort 5 1
304 Musselburgh 8 1
305 North Berwick 3 0
306 Peebles 7 1
307 Penicuik 3 0
308 Polmont, Redding and
Westquarter
4 0
309 Prestonpans 6 0
310 Edinburgh Airport 4 0
312 Rosyth 6 0
313 Selkirk 2 0
314 Slamannan 4 0
315 South Queensferry 2 0
316 Stow 3 1
318 Torryburn 6 0
319 Tranent 4 0
321 Walkerburn 3 1
322 West Barns 3 0
323 West Calder 2 0
325 Whitburn 2 0
326 Bowmont Valley 4 1
327 Manor Valley 3 0
329 Straiton 2 0
330 Corpach and Caol 5 0
332 Fort William 3 1
333 Golspie 5 0
334 Dornoch 1 1
335 Blairninich 2 0
336 Dingwall 7 0
337 Alness 1 0
338 Portmahomack 3 0
339 Inver 3 0
340 Conon Bridge 2 1
#OFFICIALPage 318

Page 319

OFFICIAL#
341 Garve 2 0
342 Smithton and Culloden 3 0
343 Drumnadrochit 4 0
345 Ardersier 2 0
346 Campbeltown 5 0
347 Taynuilt and Brochroy 1 2
348 Glencoe 1 1
349 Ballachulish 1 1
350 Kinlochewe 1 0
351 Lochinver 1 0
352 Halkirk 1 0
353 Clachan 5 0
354 Gairloch 1 0
357 Beauly 1 0
358 Avoch 3 0
359 Fort Augustus 2 1
361 Tarbert 6 0
362 Invergordon 1 0
363 Maryburgh 2 0
364 Inveraray 1 1
365 Lochgilphead 2 2
366 Oban 5 0
367 Thurso 3 0
368 Walls 1 0
369 Vidlin 1 0
370 Sanday 3 0
371 Whitehall 3 0
372 Stromness 3 0
373 St Mary's 4 0
374 Graemeshall 3 0
375 Kirkwall 5 0
377 Little Ayre 3 0
378 Stornoway 4 0
379 North Uist 4 0
380 South Uist 7 0
381 Benbecula 8 0
382 St Margaret's Hope 3 0
383 Lerwick 1 0
384 Castlebay / Bágh a' Chaisteil 2 0
385 Burray Village 4 0
386 Wick 2 0
387 Inverness 8 1
388 Cullivoe 4 0
389 Hopeman 3 0
390 Lhanbryde 3 0
391 Lossiemouth 3 0
392 Elgin 8 0
393 Garmouth 2 1
394 Dalwhinnie 1 0
395 Kingussie 2 1
396 Aviemore 2 1
397 Rothes 6 1
#OFFICIALPage 319

Page 320

OFFICIAL#
398 Portgordon 4 1
399 Portsoy 1 2
400 Banff 3 1
401 Whitehills 2 2
402 Macduff 2 2
403 Huntly 3 0
404 Keith 1 1
405 Ellon 3 2
406 Boddam 3 0
407 Peterhead 4 1
408 Fraserburgh 3 0
409 Inverurie 7 0
410 Kintore 4 0
411 Insch 1 2
412 Bridge of Don 10 0
413 Aberdeen Central 11 0
414 Ballater 5 0
415 Peterculter 5 0
416 Westhill 2 0
417 Aboyne 3 0
418 Tarland 1 0
419 Stonehaven 12 0
420 Kinloss 2 2
421 Dallas 2 1
422 Kemnay 5 0
423 Newburgh (Aberdeenshire) 2 1
424 Cove Bay 2 0
425 Portlethen 2 0
426 Nigg Bay 2 0
427 Forres 5 0
428 Nairn 3 1
430 Dyce 4 0
431 Aultbea 1 1
432 Aberlour 4 1
433 Banchory 1 1
434 Nethy Bridge 3 1
435 Muir of Ord 1 0
436 Strathpeffer 1 0
438 Balintore 3 0
439 Rockfield 3 0
440 Pierowall 3 0
441 The Ayre 3 0
442 Scalloway 2 0
443 Newtonmore 3 1
444 Newmill (Keith) 2 0
445 Kingswells (north) 2 0
446 Churchill Barriers 3 0
447 Cruden Bay 3 0
448 Cunningsburgh 1 0
449 Turriff 1 1
450 Methlick 1 0
455 Buckie and Portessie 9 0
#OFFICIALPage 320

Page 321

OFFICIAL#
456 A960 Deerness 2 0
457 Kerrysdale 1 0
458 Gardenstown 2 1
459 Crovie 2 1
460 Pennan 2 1
461 Sandhaven 2 1
462 Rosehearty 3 1
463 Kingston 3 1
466 Barlanark 2 0
9991 Seatown, Lossiemouth 6 0
9992 Newmill (Nairn) 1 1
10300 Plains 1 1
16310 Heck and Greenhill 2 0
16702 Balornock 1 1
16800 Garthamlock 2 1
21001 Dundonald 1 2
31900 Macmerry 4 0
43001 Rutherglen 5 1
43002 Polmadie 5 0
43003 Mount Florida 3 0
43004 Castlemilk east 3 0
44001 Plantation 5 0
44002 Pollokshields 3 0
45001 Glasgow centre west 7 0
45002 Glasgow centre east 5 0
48001 Dalmarnock 5 0
48002 Tollcross 3 0
65001 Bridge of Weir 2 0
80001 Carmyle 3 1
80002 Cambuslang west 4 0
80003 Cambuslang east 5 0
81001 Torrance and Balmore 2 1
94001 Wishaw north 2 0
#OFFICIALPage 321

Page 322

OFFICIAL#
Target area
ID
Target area name Local authority Target area summary What is the current understanding of flood risk
330 Corpach and Caol Highland
The villages of Caol and Corpach are near Fort
William, on the northern shore of Loch Linnhe, within
the Highland Council area. Caol and Corpach are at
risk from surface water, coastal and river flooding.
There are approximately 750 people at risk from
flooding and approximately 440 homes and
businesses. This is estimated to increase to 1,400
people and 790 homes and businesses by the 2080s
due to climate change. The Caol and Lochyside Flood
Protection Scheme has started construction.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The understanding of surface water flood
risk is improving due to the ongoing development of a Highland wide surface
wide management plan which includes Caol and Corpach as priority areas. A
sewer flood risk assessment has also been completed. Understanding of river
and coastal flood risk has improved by the studies supporting the
development of the Caol and Lochyside Flood Protection Scheme. There is a
long record of flooding in this target area with notable flooding in January
2005 when a coastal storm surge combined with high flows in the River
Lochy.
The Dynamic Coast project has shown that parts of the shoreline in or
adjacent to this target area are subject to erosion at present or are
considered likely to erode in the future. Consideration should be given to
how erosion might impact flood risk. Any actions taken should aim to
support building natural resilience to flooding and not lead to an increase in
erosion. 
#OFFICIAL
Page 322

Page 323

OFFICIAL#
332 Fort William Highland
Fort William is a town in the Scottish Highlands,
located on the shore of Loch Linnhe within the
Highland Council area. Fort William is at risk from
surface water, coastal and river flooding. There are
approximately 730 people and 500 homes and
businesses currently at risk from flooding. This is
likely to increase to 1,100 people and 730 homes and
businesses by the 2080s due to climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The understanding of surface water flood
risk is improving due to the ongoing development of a Highland wide surface
wide management plan which includes Fort William as a priority area. A
sewer flood risk assessment has also been completed. The understanding of
river and coastal flood warning is improved by the operation and
development of the Nevis and Lochy river flood warning schemes and the
Loch Linnhe coastal flood warning scheme. There are frequent records of
flooding in the Fort William target area including recent coastal flooding in
January 2020 during Storm Brendan.
The Dynamic Coast project has shown that parts of the shoreline in or
adjacent to this target area are subject to erosion at present or are
considered likely to erode in the future. Consideration should be given to
how erosion might impact flood risk. Any actions taken should aim to
support building natural resilience to flooding and not lead to an increase in
erosion. 
333 Golspie Highland
Golspie is on the north east coast of Scotland within
the Highland Council area. Golspie is at risk from
coastal flooding and surface water flooding. There
are approximately 190 people and 130 homes and
businesses currently at risk from flooding. This is
likely to increase to 210 people and 150 homes and
businesses by the 2080s due to climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The understanding of coastal flood risk
has improved due to the completion of the Golspie Flood Protection Study
(2019). The understanding of surface water flood risk is improved by a sewer
flood risk assessment. There is a long record of flooding in Golspie including
notable coastal flooding in October 2014.
The Dynamic Coast project has shown that parts of the shoreline in or
adjacent to this target area are subject to erosion at present or are
considered likely to erode in the future. Consideration should be given to
how erosion might impact flood risk. Any actions taken should aim to
support building natural resilience to flooding and not lead to an increase in
erosion. 
#OFFICIAL
Page 323

Page 324

OFFICIAL#
334 Dornoch Highland
The town of Dornoch is in the Highland Council area.
Dornoch is at risk from river flooding and surface
water flooding. There are approximately 150 people
and 100 homes and businesses currently at risk from
flooding. This is likely to increase to 200 people and
130 homes and businesses by the 2080s due to
climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources, and this national assessment has
highlighted the risk of flooding in this target area. Periodic flooding from the
Dornoch Burn and surface water is recorded in Dornoch.
335 Blairninich Highland
Blairninich is a village within the Highland Council
area. The main source of flooding in Blairninich is
river flooding. There are approximately 40 people
and 30 homes and businesses currently at risk from
flooding. This is expected to remain the same by the
2080s due to climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The understanding of river flood risk has
improved due to the completion of the River Peffery Flood Study (2019).
There is a long record of flooding from the River Peffery in Blairninich
including floods in October 2012 and December 2013.
336 Dingwall Highland
Dingwall is located in the inner Cromarty Firth and is
within the Highland Council area. Dingwall is at risk
from surface water, river and coastal flooding. There
are approximately 640 people and 460 homes and
businesses currently at risk from flooding. This is
likely to increase to 950 people and 660 homes and
businesses by the 2080s due to climate change. Areas
of Dingwall are protected from river and coastal
flooding by the Dingwall Flood Protection Scheme.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The understanding of river flood risk has
improved due to the completion of the River Peffery Flood Study (2019) and
for coastal flooding by the development and operation of the Moray Firth
coastal flood warning scheme. The understanding of surface water flood risk
is improving through the development of the Highland wide surface water
management plan which includes Dingwall as a priority area. A sewer flood
risk assessment has also been completed. There are frequent records of
flooding in Dingwall, including notable floods in October 2006 and July 2019.
337 Alness Highland
Alness is located on the northern bank of the
Cromarty Firth in the Highland Council area. Alness is
at risk from river flooding and surface water flooding.
There are approximately 310 people and 200 homes
and businesses currently at risk from flooding. This is
likely to increase to 420 people and 280 homes and
businesses by the 2080s due to climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national flood risk assessment is
improved for river flooding by the flood map update of the River Averon and
Contullich Burn in 2018. The understanding of surface water flood risk is
improved by a sewer flood risk assessment. There are limited records of
flooding in the Alness target area.
#OFFICIAL
Page 324

Page 325

OFFICIAL#
338 Portmahomack Highland
Portmahomack is on the Tarbat Ness Peninsula, in
the Highland Council area. The main source of
flooding in Portmahomack is from coastal flooding.
There are approximately 100 people at risk from
flooding and approximately 50 homes and
businesses. This is not expected to increase
significantly by the 2080s due to climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national flood risk assessment is
improved for coastal flood risk through the development and operation of
the Moray Firth coastal flood warning scheme. There are limited records of
flooding in the Portmahomack area.
The Dynamic Coast project has shown that parts of the shoreline in or
adjacent to this target area are subject to erosion at present or are
considered likely to erode in the future. Consideration should be given to
how erosion might impact flood risk. Any actions taken should aim to
support building natural resilience to flooding and not lead to an increase in
erosion. 
339 Inver Highland
Inver and Skinnerton are on the south shore of Inver
Bay in the Highland Council area. The main source of
flooding is coastal flooding. There are approximately
110 people and 80 homes and businesses at risk from
flooding, which is a significant proportion of the
community. This is estimated to increase significantly
to 200 people and 120 homes and businesses by the
2080s due to climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national flood risk assessment is
improved for coastal flood risk through the development and operation of
the Moray Firth coastal flood warning scheme. There are no records of
flooding in the Inver target area but this does not confirm that there is no
flood risk.
The Dynamic Coast project has shown that parts of the shoreline in or
adjacent to this target area are subject to erosion at present or are
considered likely to erode in the future. Consideration should be given to
how erosion might impact flood risk. Any actions taken should aim to
support building natural resilience to flooding and not lead to an increase in
erosion. 
#OFFICIAL
Page 325

Page 326

OFFICIAL#
340 Conon Bridge Highland
Conon Bridge is located on the banks of the River
Conon in the Highland Council area. Conon Bridge is
at risk of surface water and river flooding. This can be
affected by high sea levels, which may slow discharge
of the River Conon into the sea at high tide. There are
approximately 180 people and 100 homes and
businesses currently at risk from flooding. This is
likely to increase to 220 people and 130 homes and
businesses by the 2080s due to climate change. Areas
of Conon Bridge are protected from river and coastal
flooding by the Conon Bridge Flood Protection
Scheme.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national flood risk assessment is
underpinned for river flooding through the development and maintenance of
the Conon Bridge Flood Protection Scheme which was completed in 1990.
The understanding of surface water flooding is improved by a sewer flood
risk assessment. Prior to the completion of the flood protection scheme,
there was a long history of periodic flooding recorded in Conon Bridge. Since
scheme completion, there are records of surface water flooding (from the Eil
Burn).
341 Garve Highland
Garve is a small village in the Highland Council area,
located on the banks of the Black Water. The main
source of flooding in Garve is river flooding. There
are approximately 30 people and 20 homes and
businesses currently at risk from flooding, which is a
significant proportion of the community. This is likely
to increase to 50 people and 30 homes and
businesses by the 2080s due to climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national flood risk assessment is
improved by the development and operation of the Conon Valley flood
warning scheme. There are periodic records of flooding in Garve, including
records of flooding from the Black Water affecting the school in 1966, 1983
and 1989.
342 Smithton and Culloden Highland
Smithton and Culloden are on the outskirts of
Inverness within the Highland Council area. The main
source of flooding in the area is surface water
flooding which includes small watercourses. There
are approximately 470 people and 250 homes and
businesses currently at risk from flooding. This is
estimated to increase to 680 people and 350 homes
and businesses by the 2080s due to climate change.
Areas of Smithton and Culloden are protected from
surface water flooding from small water courses
from the Smithton and Culloden Flood Protection
Scheme.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The understanding of surface water
flooding from small watercourses has improved due to the completion of the
Smithton and Culloden Flood Protection Scheme which was completed in
2020. The understanding of surface water flood risk is improving through the
ongoing development of a Highland wide surface water management plan
which includes Smithton and Culloden as a priority area. The integrated
catchment study and sewer flood risk assessment has also improved
understanding of flood risk. Prior to scheme completion there had been a
long record of flooding in Smithton and Culloden including notable floods in
July and August 2011 when persistent rainfall caused extensive flooding from
the Smithton Burn and Culloden Burn West.
#OFFICIAL
Page 326

Page 327

OFFICIAL#
343 Drumnadrochit Highland
Drumnadrochit is located on the western banks of
Loch Ness within the Highland Council area. The main
source of flooding in Drumnadrochit is river flooding.
There are approximately 250 people and 180 homes
and businesses currently at risk from flooding. This is
likely to increase to 310 people and 230 homes and
businesses by the 2080s due to climate change. The
Drumnadrochit Flood Protection Scheme, which will
provide protection to properties at risk of flooding
from the River Enrick, has started construction.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The understanding of flooding from the
River Enrick has improved by the various studies used to develop the
Drumnadrochit Flood Protection Scheme. There is a long history of periodic
flooding from the River Enrick and the River Coiltie recorded in
Drumnadrochit.
345 Ardersier Highland
The former fishing village of Ardersier is located on
the eastern shore of the Moray Firth, near Inverness
Airport. It is in the Highland Council area. The main
flooding concern is from the impact of climate
change on coastal flooding. There are approximately
160 people and 110 homes and businesses at risk
from flooding. This is estimated to increase to 320
people and 200 homes and businesses by the 2080s
due to climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national flood risk assessment is
improved for coastal flooding by the development and operation of the
Moray Firth coastal flood warning scheme. There are limited records of
flooding in the Ardersier target area.
The Dynamic Coast project has shown that parts of the shoreline in or
adjacent to this target area are subject to erosion at present or are
considered likely to erode in the future. Consideration should be given to
how erosion might impact flood risk. Any actions taken should aim to
support building natural resilience to flooding and not lead to an increase in
erosion. 
348 Glencoe Highland
The village of Glencoe is located on the coast of Loch
Leven within the Highland Council area. Glencoe is at
risk from coastal, river and surface water flooding.
There are approximately 90 people and 60 homes
and businesses currently at risk from flooding. This is
estimated to increase to 110 people and 80 homes
and businesses by the 2080s due to climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources, and this national assessment has
highlighted the risk of flooding in this target area. There are periodic records
of flooding in Glencoe in recent years, including flooding during Storm
Desmond in December 2015.
#OFFICIAL
Page 327

Page 328

OFFICIAL#
349 Ballachulish Highland
The village of Ballachulish is located on the southern
shore of Loch Leven within the Highland Council area.
Ballachulish is at risk from river and surface water
flooding. There are approximately 150 people and
100 homes and businesses at risk from flooding. This
is estimated to increase to 220 people and 130
homes and businesses by the 2080s due to climate
change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources, and this national assessment has
highlighted the risk of flooding in this target area. There are periodic records
of flooding in Ballachulish in recent years, including floods in February 1998
as a result of heavy rainfall and blocked culverts and flooding during Storm
Desmond in December 2015.
The Dynamic Coast project has shown that parts of the shoreline in or
adjacent to this target area are subject to erosion at present or are
considered likely to erode in the future. Consideration should be given to
how erosion might impact flood risk. Any actions taken should aim to
support building natural resilience to flooding and not lead to an increase in
erosion. 
350 Kinlochewe Highland
Kinlochewe is a village located on the eastern edge of
Loch Maree in the Highland Council area. The main
source of flooding in Kinlochewe is the A' Ghairbhe.
There are approximately 30 people and 30 homes
and businesses currently at risk from flooding, which
is a significant proportion of the community. This is
not estimated to change by the 2080s due to climate
change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources, and this national assessment has
highlighted the risk of flooding in this target area. There are no records of
flooding in the Kinlochewe target area but this does not confirm that there is
no flood risk.
351 Lochinver Highland
Lochinver is located in the north west of Scotland
within the Highland Council area. Lochinver is at risk
of coastal and river flooding with a school being at
risk from river flooding. There are approximately 90
people and 70 homes and businesses currently at risk
from flooding which is a significant proportion of the
community. This is likely to increase to 120 people
and 90 homes and businesses by the 2080s due to
climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources, and this national assessment has
highlighted the risk of flooding in this target area. There are limited records
of flooding in the Lochinver target area. In February 1998 heavy rainfall
caused flooding which is understood to have affected Lochinver Primary
School.
#OFFICIAL
Page 328

Page 329

OFFICIAL#
352 Halkirk Highland
Halkirk is in Caithness, within the Highland Council
area. The main source of flooding in Halkirk is from
surface water, however this is not accurately
reflected in the current SEPA flood maps. There are
approximately 90 people and 50 homes and
businesses currently at risk from flooding. This is
estimated to increase to approximately 60 homes
and businesses by the 2080s due to climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources, and this national assessment has
highlighted the risk of flooding, (principally associated with surface water
flood risk) in this target area.  Halkirk has therefore been identified as a new
target area for the 2021 flood risk management plans. The understanding of
surface water flood risk is improving due to the ongoing development of a
Highland wide surface wide management plan which includes Halkirk as a
priority area and a sewer flood risk assessment. There is a long history of
flooding in Halkirk including records of surface water flooding in November
2013 and January 2016.
354 Gairloch Highland
The Gairloch target area includes the villages of
Strath and Gairloch, which are located south west of
Poolewe. The target area is included in the Highland
Council area. The main source of flooding in Gairloch
is from coastal flooding. There are approximately 70
people at risk from flooding and approximately 40
homes and businesses. This is estimated to increase
to 80 people and 50 homes and businesses by the
2080s due to climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources, and this national assessment has
highlighted the risk of flooding in this target area. Gairloch has therefore
been identified as a new target area for the 2021 flood risk management
plans. There are limited records of flooding in the Gairloch target area.
The Dynamic Coast project has shown that parts of the shoreline in or
adjacent to this target area are subject to erosion at present or are
considered likely to erode in the future. Consideration should be given to
how erosion might impact flood risk. Any actions taken should aim to
support building natural resilience to flooding and not lead to an increase in
erosion. 
#OFFICIAL
Page 329

Page 330

OFFICIAL#
357 Beauly Highland
Beauly is located west of Inverness on the River
Beauly within the Highland Council area. Beauly is at
risk from surface water, river and coastal flooding.
However there is also risk of river and coastal
flooding. There are approximately 170 people and 90
homes and businesses currently at risk from flooding.
This is likely to increase to 250 people and 130
homes and businesses by the 2080s due to climate
change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources, and this information has highlighted the
risk of flooding, (principally associated with the risk of flooding from the
River Beauly) in the area. Beauly has therefore been identified as a new
target area for the 2021 flood risk management plans. The national level
assessment is improved for surface water by a sewer flood risk assessment.
Understanding for river and coastal flood risk is improved by the
development and operation of the river and coastal flood warning schemes.
There is a long history of flooding in the Beauly target area including in
March 2015 after melting snow and heavy rainfall led to the River Beauly to
overtop its banks.
358 Avoch Highland
Avoch is located on the northern coastline of the
Moray Firth in the Highland Council area. The main
source of flooding is coastal flooding. There are
approximately 110 people and 70 homes and
businesses at risk from flooding. This is estimated to
increase to 200 people and 110 homes and
businesses by the 2080s due to climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources, and this information has highlighted the
risk of coastal flooding, (principally associated with climate change) in this
target area. Avoch has therefore been identified as a new target area for the
2021 flood risk management plans. The national level assessment is
improved for coastal flood risk by the development and operation of the
Moray Firth flood warning scheme. There are limited records of flooding in
the Avoch target area.
The Dynamic Coast project has shown that parts of the shoreline in or
adjacent to this target area are subject to erosion at present or are
considered likely to erode in the future. Consideration should be given to
how erosion might impact flood risk. Any actions taken should aim to
support building natural resilience to flooding and not lead to an increase in
erosion. 
#OFFICIAL
Page 330

Page 331

OFFICIAL#
359 Fort Augustus Highland
Fort Augustus is located within the Highland Council
area at the south west end of Loch Ness. Fort
Augustus is at risk from river and surface water
flooding. Areas of Fort Augustus are protected
against flooding from the River Oich by the Fort
Augustus Flood Protection Scheme. There are
approximately 150 people and 120 homes and
businesses currently at risk from flooding. This is
unlikely to change significantly by the 2080s due to
climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment for river
flooding is underpinned by the studies used to develop The Riggs, Fort
Augustus Flood Protection Scheme (1994). Understanding is also improved
for river flooding by the development and operation of the River Oich flood
warning scheme. Prior to the development of the flood protection scheme
there had been several records of flooding from the River Oich, primarily in
the Riggs estate, including notable floods in 1989 and 1990.
362 Invergordon Highland
Invergordon is located in Easter Ross in the north of
Scotland within the Highland Council area. The main
source of flooding in Invergordon is surface water
flooding. There are approximately 290 people and
210 homes and businesses currently at risk of
flooding. This is likely to increase to 480 people and
330 homes and businesses by the 2080s due to
climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment for surface
water flooding is improved by a sewer flood risk assessment. There are
limited records of flooding in the Invergordon target area.
363 Maryburgh Highland
Maryburgh is a village on the northern banks of River
Conon, within the Highland Council area. Maryburgh
is at risk from surface water and river flooding. There
are approximately 150 people and 80 homes and
businesses currently at risk from flooding. This is
likely to increase to 160 people and 90 homes and
businesses by the 2080s due to climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources, and this national assessment has
highlighted the risk of flooding, in this target area. A significant number of
homes and businesses in Maryburgh are at risk of surface water and river
flooding. Maryburgh has therefore been identified as a new target area for
the 2021 flood risk management plans. There are limited records of flooding
in the Maryburgh target area.
#OFFICIAL
Page 331

Page 332

OFFICIAL#
367 Thurso Highland
Thurso is located in Caithness on the north coast of
Scotland and is within the Highland Council area.
Thurso is at risk from river flooding and coastal
flooding. Thurso has flooded in the past from a
combination of high sea levels and high water levels
on the River Thurso. This combined flood risk is not
reflected in SEPA's flood maps. There are
approximately 140 people and 90 homes and
businesses currently at risk from flooding. This is
likely to increase to 200 people and 130 homes and
businesses by the 2080s due to climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The understanding of river and coastal
flood risk has improved due to the completion of the River Thurso Flood
Protection Study (2019). There is a long history of flooding in Thurso,
including combined tidal and river flooding in January 2005.
386 Wick Highland
Wick is located in eastern Caithness within the
Highland Council area. Wick is at risk from surface
water, river and coastal flooding. There are
approximately 320 people and 250 homes and
businesses currently at risk from flooding. This is
likely to increase to 400 people and 330 homes and
businesses by the 2080s due to climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment for river
flooding has been improved by the flood map improvements for the Burn of
Newton and Mill Lade between Loch Hempriggs to the confluence with the
River Wick. The understanding of surface water flood risk has improved
through a sewer flood risk assessment and for coastal flooding by the
development and operation of the Moray flood warning scheme. There is a
long history of flooding in Wick. This includes coastal flooding in 2012 and
flooding in January 2016 from surface water following heavy rain.
#OFFICIAL
Page 332

Page 333

OFFICIAL#
387 Inverness Highland
Inverness is located on the Beauly Firth, within the
Highland Council area. There is a risk from coastal,
river and surface water flooding in Inverness. There
are approximately 4,800 people and 2,800 homes
and businesses currently at risk from flooding. This is
likely to increase to 12,000 people and 6,600 homes
and businesses by the 2080s due to climate change.
Areas of Inverness are protected by river and coastal
flooding by either the River Ness (Tidal) Flood
Protection Scheme or the Inverness South West
Relief Channel.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The understanding of river and coastal
flooding has been improved by various studies including the Mill Burn Flood
Study (2019) and the studies to develop The River Ness (Tidal) Flood
Protection Scheme and the Inverness South West Relief Channel. The
understanding of surface water flooding is improving due to the ongoing
development of a Highland wide surface water management plan which
includes Inverness as a priority area. The understanding of flood risk has also
been improved by the integrated catchment study and the development and
operation of the Moray Firth and Ness River flood warning schemes.
Prior to the construction of the flood protection schemes there was a long
history of flooding from the River Ness and the small watercourses in the
south west of the city. In areas not protected by schemes there is frequent
flooding recorded, including from the Mill Burn, the Dell Burn and from
surface water.
389 Hopeman Moray
Hopeman is located along the southern shore of the
Moray Firth and is within the Moray Council area.
The main source of flooding in the area is surface
water flooding. There are approximately 180 people
and 110 homes and businesses currently at risk from
flooding. This is likely to increase to 240 people and
150 homes and businesses by the 2080s due to
climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources, and this national assessment has
highlighted the risk of surface water flooding in this target area. Hopeman
has therefore been identified as a new target area for the 2021 flood risk
management plans. The national assessment is improved for surface water
flooding by the development of private works to reduce the risk of surface
water flooding in the Hopeman area. Heavy rainfall is known to run off the
steep surrounding hills overwhelming the local drainage systems. There are
frequent records of surface water flooding in Hopeman, including floods
during August and October 2014.
#OFFICIAL
Page 333

Page 334

OFFICIAL#
390 Lhanbryde Moray
Lhanbryde is located east of Elgin in the Moray
Council area. The national assessment estimates that
there are approximately 180 people and 100 homes
and businesses at risk from flooding. The Lhanbryde
Flood Protection Scheme benefits an estimated 30
homes and 5 businesses up to a 1 in 100 year
standard of protection. The number of people,
homes and businesses at risk is expected to increase
by approximately 10% by the 2080s due to climate
change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is
underpinned for river flooding by the design of the Lhanbryde Flood
Protection Scheme (2005) and is improved for surface water flooding by a
sewer flood risk assessment. There were frequent records of flooding prior
to completion of the flood scheme including notable floods in 1997. Since
completion, surface water flooding has been recorded, and there are also
records of floods in nearby areas not protected by the scheme.
391 Lossiemouth Moray
Lossiemouth is located on the southern shore of the
Moray Firth south and is within the Moray Council
area. The main source of flooding in Lossiemouth is
coastal flooding. There are approximately 140 people
and 90 homes and businesses currently at risk from
flooding. This is estimated to increase to 200 people
and 130 homes and businesses by the 2080s due to
climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved
for coastal flooding by the development and operation of the Moray Firth
flood warning scheme. There is a long history of coastal flooding in
Lossiemouth.
The Dynamic Coast project has shown that parts of the shoreline in or
adjacent to this target area are subject to erosion at present or are
considered likely to erode in the future. Consideration should be given to
how erosion might impact flood risk. Any actions taken should aim to
support building natural resilience to flooding and not lead to an increase in
erosion. 
#OFFICIAL
Page 334

Page 335

OFFICIAL#
392 Elgin Moray
Elgin is located in the north of Scotland on the banks
of the River Lossie in the Moray Council area. The
main sources of flooding in Elgin are river and surface
water flooding. There are approximately 1,200
people and 780 homes and businesses currently at
risk from flooding. This is likely to increase to 3,400
people and 2,000 homes and businesses by the 2080s
due to climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved
for flooding from the River Lossie due to the development of the Elgin Flood
Alleviation Scheme and the River Lossie flood warning scheme. The
understanding of surface water flood risk is improved by the Moray Surface
Water Management Plan. There is a long history of river flooding in the Elgin
target area including notable floods prior to the construction of the flood
scheme in July 1997 and in November 2002. There are also records of
surface water flooding, including recent flash floods in August 2019.
393 Garmouth Moray
Garmouth is located near the mouth of the River
Spey within in the Moray Council area. The main
source of flooding in Garmouth is the River Spey.
There is also a risk of surface water and coastal
flooding. Combined river and coastal flooding may
also be an issue. There are approximately 80 people
and 50 homes and businesses currently at risk from
flooding. A local assessment indicates that this may
be over-estimated. This is estimated to increase to 90
people and 60 homes and businesses by the 2080s
due to climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved
by studies and inspections carried out by Moray Council. Understanding of
both river and coastal flooding is improved by the development and
operation of the Moray Firth and the River Spey flood warning schemes. The
understanding of surface water flooding is improved by a sewer flood risk
assessment. There are frequent records of flooding in Garmouth.
394 Dalwhinnie Highland
Dalwhinnie is on the edge of the Cairngorms National
Park in the Highland Council area. The main source of
flooding in Dalwhinnie is river flooding. There are
approximately 30 people and 30 homes and
businesses currently at risk from flooding, which is a
significant proportion of the community. This is not
expected to change significantly by the 2080s due to
climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment for river
flooding is improving as a result of the ongoing mapping and modelling of
the River Truim and its tributaries. There are limited records of flooding in
the Dalwhinnie target area.
#OFFICIAL
Page 335

Page 336

OFFICIAL#
395 Kingussie Highland
Kingussie is situated in the Cairngorms National Park
on the banks of the River Spey. It is within the
Highland Council Area. The main source of flooding in
Kingussie is river flooding. There are approximately
270 people and 180 homes and businesses currently
at risk from flooding. This is likely to increase to 330
people and 220 homes and businesses by the 2080s
due to climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The understanding of river flooding has
improved by the recent flood modelling of the River Gynack to determine
the extent of flood risk to Kingussie. Whilst the River Gynack is the main
source of flooding in Kingussie, the understanding of flooding from the River
Spey has also improved through the development and operation of the River
Spey flood warning scheme. The understanding of surface water flood risk is
improved by a sewer flood risk assessment. There are records of regular
flooding from the River Gynack in Kingussie including a notable flood in
August 2014 due to ex-Hurricane Bertha.
396 Aviemore Highland
Aviemore is in the Cairngorms National Park on the
banks of the River Spey. It is within the Highland
Council area. Aviemore is at risk from river and
surface water flooding. There are approximately 430
people and 240 homes and businesses currently at
risk from flooding. This is likely to increase to 490
people and 270 homes and businesses by the 2080s
due to climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment for river
flooding is improved by the development and operation of the River Spey
flood warning scheme. The understanding of surface water flooding is
improved by a sewer flood risk assessment. There is a long history of
flooding in Aviemore from the River Spey including a notable flood in
December 2015 when the River Spey overflowed its banks during Storm
Desmond. There are also records of flooding from the Aviemore Burn.
#OFFICIAL
Page 336

Page 337

OFFICIAL#
397 Rothes Moray
Rothes is on the banks of the River Spey and is within
the Moray Council area. The main source of flooding
in Rothes is from surface water flooding, however
there is also a risk from river flooding. There are
approximately 780 people and 520 homes and
businesses currently at risk from flooding, which is a
significant proportion of the community. This is likely
to increase to 830 people and 560 homes and
businesses by the 2080s due to climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved
for surface water by the Moray Surface Water Management Plan. The
understanding of flood risk from the Burn of Rothes, Back Burn and Black
Burn is underpinned by the studies to develop the Rothes Flood Protection
Scheme. The understanding of flood risk from the River Spey is improved by
the development and operation of the Spey flood warning scheme. There is
a long history of flooding in Rothes, including notable flooding in September
2009 from the River Spey, the Back Burn and the Burn of Rothes, prior to the
completion of the Rothes Flood Protection Scheme.
398 Portgordon Moray
Portgordon lies 2km south west of Buckie, in the
Moray Council area. The main source of flooding in
Portgordon is surface water flooding, however there
is also risk of coastal flooding. The risk of coastal
flooding is underestimated as wave overtopping is
not currently accounted for in the SEPA strategic
mapping. There are approximately 100 people and 50
homes and businesses currently at risk from flooding.
This is likely to increase to 120 people and 70 homes
and businesses by the 2080s due to climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved
for coastal flooding by the Portgordon Flood Study (2019). The
understanding of surface water flooding is improved by the Moray Surface
Water Management Plan. There is a long history of coastal flooding in the
Portgordon target area including notable flooding during the North Sea flood
of January 1953. There are also periodic records of surface water flooding.
The Dynamic Coast project has shown that parts of the shoreline in or
adjacent to this target area are subject to erosion at present or are
considered likely to erode in the future. Consideration should be given to
how erosion might impact flood risk. Any actions taken should aim to
support building natural resilience to flooding and not lead to an increase in
erosion. 
#OFFICIAL
Page 337

Page 338

OFFICIAL#
404 Keith Moray
Keith is located in north east Scotland within the
Moray Council area. The main source of flooding in
Keith is from surface water flooding. There are
approximately 60 people and 70 homes and
businesses currently at risk from flooding. This is
likely to remain the same by the 2080s due to climate
change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources, and this national assessment has
highlighted the risk of surface water flooding. Keith has therefore been
identified as a new target area for the 2021 flood risk management plans.
The national assessment is improved for surface water by the Moray Surface
Water Management Plan. The understanding of river flooding is improved by
the operation of the River Deveron flood warning scheme. There are records
of surface water flooding in the Keith target area.
420 Kinloss Moray
Kinloss is a village located near the shore of Findhorn
Bay in the Moray Council area. The main source of
flooding in Kinloss is from river flooding, however
there is also a risk of surface water and coastal
flooding. There are approximately 320 people and
220 homes and businesses currently at risk from
flooding. This is likely to increase to 390 people and
270 homes and businesses by the 2080s due to
climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources, and this national assessment has
highlighted the risk of flooding to a significant proportion of the community
in Kinloss. This risk is also expected to increase with climate change. Kinloss
has therefore been identified as a new target area for the 2021 flood risk
management plans. The national assessment is improved for coastal flooding
by the development and operation of the Moray Firth flood warning scheme.
There are limited records of flooding in Kinloss.
421 Dallas Moray
Dallas is south west of Elgin on the banks of the River
Lossie. It is within the Moray Council area. The main
source of flooding in Dallas is river flooding. There
are approximately 30 people and 20 homes and
businesses currently at risk from flooding. This is
likely to increase to 40 people and 30 homes and
businesses by the 2080s due to climate change.
Dallas benefits from a flood protection embankment,
which reduces flood risk from the River Lossie.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources, and this national assessment has
highlighted the risk of flooding from the River Lossie to a significant
proportion of the community in Dallas. Access roads are also at risk. Dallas
has therefore been identified as a new target area for the 2021 flood risk
management plans. The national assessment of flooding from the River
Lossie has improved through the Dallas Flood Appraisal Study (2016) which
identified the option of a set-back embankment to reduce flood risk. The
embankment was built in 2017. Prior to its construction there was periodic
flooding from the River Lossie in the Dallas target area.
#OFFICIAL
Page 338

Page 339

OFFICIAL#
427 Forres Moray
Forres is located in the north east of Scotland and is
within the Moray Council area. The main source of
flooding in Forres is surface water flooding. However
there is also a risk of river flooding, which is largely
managed by the 2 flood schemes. There are
approximately 2,000 people and 1,000 homes and
businesses currently at risk from flooding. This is
likely to increase to 2,400 people and 1,200 homes
and businesses by the 2080s due to climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved
for river flooding by the studies to develop the Forres (River Findhorn and
Pilmuir) and the Forres (Burn of Mosset) Flood Alleviation Schemes. The
understanding of surface water flood risk is improved by the Moray Surface
Water Management Plan. Prior to the development of the flood protection
schemes there was a long history of river flooding in Forres, including
notable flooding in 1997 when the Burn of Mosset burst its banks. There are
frequent records of surface water flooding.
428 Nairn Highland
Nairn is located along the southern shore of the
Moray Firth in the Highland Council area. Nairn is at
risk from river, coastal and surface water flooding.
There are approximately 1,300 people and 760
homes and businesses currently at risk from flooding.
This is likely to increase to 1,700 people and 990
homes and businesses by the 2080s due to climate
change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved
for coastal flooding by the operation and maintenance of the Moray Firth
flood warning scheme. Understanding of surface water flooding is improved
for surface water by a sewer flood risk assessment. There is a long history of
periodic flooding recorded in Nairn from the River Nairn and the Auldearn
Burn. There are also records of flooding to Harbour Street caused by
combined high tide and river levels.
The Dynamic Coast project has shown that parts of the shoreline in or
adjacent to this target area are subject to erosion at present or are
considered likely to erode in the future. Consideration should be given to
how erosion might impact flood risk. Any actions taken should aim to
support building natural resilience to flooding and not lead to an increase in
erosion. 
#OFFICIAL
Page 339

Page 340

OFFICIAL#
431 Aultbea Highland
Aultbea is located north of Poolewe in the Highland
Council area. The main source of flooding that affects
the village of Aultbea is coastal flooding. This could
worsen due to climate change and sea level rise,
possibly leading to tide locking of the Allt Beithe.
There are approximately 70 people and 40 homes
and businesses currently at risk of flooding, which is a
significant proportion of the community. This is likely
to increase to 90 people and 50 homes and
businesses by the 2080s due to climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources, and this information has highlighted the
risk of flooding, (principally associated with coastal flood risk) in this area.
The risk is expected to increase due to climate change, as sea levels are
expected to rise and winter storms become more frequent. Aultbea has
therefore been identified as a new target area for the 2021 flood risk
management plans. There are no records of flooding in the Aultbea target
area but this does not confirm that there is no flood risk.
The Dynamic Coast project has shown that parts of the shoreline in or
adjacent to this target area are subject to erosion at present or are
considered likely to erode in the future. Consideration should be given to
how erosion might impact flood risk. Any actions taken should aim to
support building natural resilience to flooding and not lead to an increase in
erosion. 
432 Aberlour Moray
Aberlour lies 20km south of Elgin and is within the
Moray Council Area. The main source of flooding in
Aberlour is surface water flooding, however there is
also risk of river flooding. There are approximately
130 people and 90 homes and businesses currently at
risk from flooding. This is likely to increase to 140
people and 110 homes and businesses by the 2080s
due to climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved
for surface water flooding by the Moray Surface Water Management Plan.
Understanding is improved for river flooding by the development and
operation of the River Spey flood warning scheme. There is a long history of
flooding in the Aberlour target area.
#OFFICIAL
Page 340

Page 341

OFFICIAL#
434 Nethy Bridge Highland
Nethy Bridge is a village on the banks of the River
Nethy in the Highland Council area. Nethy Bridge is at
risk of river and surface water flooding. There are
approximately 180 people and 120 homes and
businesses at risk from flooding. This is likely to
increase to 200 people and 130 homes and
businesses by the 2080s due to climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources, and this national assessment has
highlighted the risk of flooding (principally from the River Nethy) in this area.
Nethy Bridge has therefore been identified as a new target area for the 2021
flood risk management plans. There are limited recent records of flooding in
the Nethy Bridge target area.
435 Muir of Ord Highland
Muir of Ord is in the Highland Council area. Muir of
Ord is at risk from river and surface water flooding.
There are approximately 220 people and 120
properties currently at risk of flooding. This is likely to
increase to 250 people and 140 homes and
businesses by the 2080s due to climate change.
There is reason to suggest flood risk may currently be
overestimated.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment for surface
water is improved by a sewer flood risk assessment. There are limited
records of flooding in the Muir of Ord target area.
436 Strathpeffer Highland
Strathpeffer is in the Highland Council area. The main
source of flooding in Strathpeffer is surface water.
There are approximately 90 people and 60 homes
and businesses currently at risk of flooding. This is
likely to increase to 140 people and 90 homes and
businesses by the 2080s due to climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The understanding of surface water flood
risk is improving due to the ongoing development of a Highland wide surface
wide management plan which includes Strathpeffer as a priority area. A
sewer flood risk assessment has also been completed. There are periodic
records of surface water flooding in Strathpeffer including recent flooding in
August 2019.
#OFFICIAL
Page 341

Page 342

OFFICIAL#
438 Balintore Highland
Balintore is located along the northern shore of the
Moray Firth. There are 2 other villages located close
by, Hilton of Cadboll and Shandwick which are also
included in the Balintore target area. These are
known as the Seaboard Villages. This area is in the
Highland Council area. The main flood source in the
Balintore area is coastal flooding. There are
approximately 90 people and 60 homes and
businesses currently at risk of flooding. This is likely
to remain the same by the 2080s due to climate
change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national flood risk assessment is
improved for coastal flood risk through the development and operation of
the Moray Firth coastal flood warning scheme. There are limited records of
flooding in the Balintore target area.
The Dynamic Coast project has shown that parts of the shoreline in or
adjacent to this target area are subject to erosion at present or are
considered likely to erode in the future. Consideration should be given to
how erosion might impact flood risk. Any actions taken should aim to
support building natural resilience to flooding and not lead to an increase in
erosion. 
439 Rockfield Highland
Rockfield is on the Tarbat Ness Peninsula, in the
Highland Council area. The main source of flooding in
Rockfield is coastal flooding, however this is not
reflected currently in our understanding as wave
overtopping is not accounted for in the SEPA
strategic mapping.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national flood risk assessment is
improved for coastal flood risk through the development and operation of
the Moray Firth coastal flood warning scheme. There is a record of coastal
flooding caused by wave overtopping in 2012.
The Dynamic Coast project has shown that parts of the shoreline in or
adjacent to this target area are subject to erosion at present or are
considered likely to erode in the future. Consideration should be given to
how erosion might impact flood risk. Any actions taken should aim to
support building natural resilience to flooding and not lead to an increase in
erosion. 
#OFFICIAL
Page 342

Page 343

OFFICIAL#
443 Newtonmore Highland
Newtonmore is in the Cairngorms National Park
within the Highland Council area. The River Spey is
located to the south and south-west of the village.
The main source of flooding in Newtonmore is
surface water flooding. There are approximately 130
people and 100 homes and businesses currently at
risk from flooding. This is likely to increase to 140
people and 110 homes and businesses by the 2080s
due to climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The understanding of surface water flood
risk is improving due to the ongoing development of a Highland wide surface
wide management plan which includes Newtonmore as a priority area. A
sewer flood risk assessment has also been completed. There are periodic
records of flooding in Newtonmore.
444 Newmill (Keith) Moray
Newmill lies just north of the town of Keith and is
within the Moray Council area. The main source of
flooding in Newmill is from surface water flooding.
There are approximately 40 people and 20 homes
and businesses at risk of flooding. This is expected to
remain the same by the 2080s, despite the impact of
climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved
for surface water by the studies to develop the Newmill Flood Protection
Scheme (2016) and the development of the Moray Surface Water
Management Plan. Prior to the construction of the flood protection scheme
there are records of periodic flooding from surface water including notable
flooding in September 2009 and September 2013. Flooding was also
recorded in June 2017 when surface water flooding damaged flood
defences.
#OFFICIAL
Page 343

Page 344

OFFICIAL#
455 Buckie and Portessie Moray
Buckie and Portessie front onto Spey Bay on the
south coast of the Moray Firth in the Moray Council
area. The main sources of flooding are coastal and
surface water flooding. The flood maps currently
don't include the impact of waves. As a result, the
assessment of coastal flood risk is considered to be
an underestimate. There are approximately 520
people and 300 homes and businesses currently at
risk from flooding. This is likely to increase to 810
people and 460 homes and businesses by the 2080s
due to climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved
for surface water by the Moray Surface Water Management Plan which
includes Buckie as a priority area. The understanding of coastal flooding is
improved in Portessie by the coastal flood risk assessment completed in
2016 and is improved across the target area by the development and
operation of the Moray Firth flood warning scheme. There is a long history of
flooding in the Buckie and Portessie area including notable coastal flooding
during the North Sea flood of January 1953. There are also frequent records
of surface water flooding in Buckie.
The Dynamic Coast project has shown that parts of the shoreline in or
adjacent to this target area are subject to erosion at present or are
considered likely to erode in the future. Consideration should be given to
how erosion might impact flood risk. Any actions taken should aim to
support building natural resilience to flooding and not lead to an increase in
erosion. 
457 Kerrysdale Highland
Kerrysdale is a small community in the Highland
Council area. The main source of flooding is the River
Kerry, which affects the junction of the A832 and
B8056. The road flooding can affect a large number
of communities along the B8056, cutting them off
from essential services. This may occur more
frequently in future due to climate change. There are
less than 10 people, homes and businesses currently
at risk from flooding.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources, and this information and flood history has
highlighted the risk of flooding, (principally to vital roads) in this target area.
Kerrysdale has therefore been identified as a new target area for the 2021
flood risk management plans. There is a history of flooding to the road and
communities are known to be affected by the road closure. Flooding at the
junction of the A832 and B8056 cuts off road access to the communities of
Shieldaig, Badachro, Opinan, Port Henderson, South Erradale and Redpoint
which are all accessed by the B8056.
#OFFICIAL
Page 344

Page 345

OFFICIAL#
463 Kingston Moray
Kingston is located on the Moray Firth by the west
bank of the River Spey as it flows into Spey Bay. It is
in the Moray Council area. The main source of
flooding in Kingston is coastal flooding. The area is
particularly vulnerable to erosion and the River
mouth shifts periodically. There are approximately 30
people and 20 homes and businesses currently at risk
of flooding. Based on a local assessment, this may be
overestimated. This is likely to increase to 70 people
and 40 homes and businesses by the 2080's due to
climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved
for coastal flood risk by the Moray Firth flood warning scheme. The
understanding of flood risk is also being improved by monitoring of the
shingle bank in front of Kingston. There are frequent records of coastal
flooding. The access roads are often affected, resulting in Kingston being cut
off from the surrounding area.
9991 Seatown, Lossiemouth Moray
Seatown is an area of Lossiemouth, facing onto the
River Lossie estuary, in the Moray Council area. The
main source of flooding in Seatown is coastal
flooding. There are approximately 390 people and
200 homes and businesses currently at risk of
flooding. This is likely to increase to 490 people and
250 homes and businesses by the 2080s due to
climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved
for coastal flooding by the Lossiemouth Coastal Flood Study. There are
records of coastal flooding in the Seatown area of Lossiemouth including
floods in December 2012.
The Dynamic Coast project has shown that parts of the shoreline in or
adjacent to this target area are subject to erosion at present or are
considered likely to erode in the future. Consideration should be given to
how erosion might impact flood risk. Any actions taken should aim to
support building natural resilience to flooding and not lead to an increase in
erosion. 
9992 Newmill (Nairn) Highland
Newmill is a village to the south east of Nairn in the
Highland Council area. Newmill is at risk from river
and surface water flooding. There is also a risk of
surface water flooding. There are approximately 20
people and 10 properties currently at risk of flooding,
which is a significant proportion of the community.
This is unlikely to increase significantly by the 2080s
due to climate change.
This section provides a summary of information, which has helped to
develop an understanding of flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments of flooding from rivers,
surface water and coastal sources, and this national assessment has
highlighted the risk of flooding in this target area.  There are limited records
of flooding in the Newmill (Nairn) target area.
#OFFICIAL
Page 345

Page 346

OFFICIAL#
LPD_ID LPD name Target area ID Target area name Category (called 'objective type' in
final target area datasheets)
Type Source Objective description Objective_ref
5 Findhorn, Nairn and Speyside 389 Hopeman Avoid flood risk Inappropriate development Pluvial Avoid inappropriate development that
increases flood risk in Hopeman
3891
5 Findhorn, Nairn and Speyside 389 Hopeman Avoid flood risk Existing flood scheme Pluvial Avoid an increase in flood risk by the
appropriate management and maintenance
of flood protection works at Hopeman
3892
5 Findhorn, Nairn and Speyside 389 Hopeman Improve data and understanding Flood asset performance Pluvial Improve data and understanding of the
performance of the flood protection asset
in Hopeman
3893
5 Findhorn, Nairn and Speyside 389 Hopeman Prepare for flooding Current and future flood risk Pluvial Prepare for current flood risk and future
flooding as a result of climate change in
Hopeman
3894
5 Findhorn, Nairn and Speyside 390 Lhanbryde Avoid flood risk Existing flood scheme Fluvial Avoid an increase in flood risk by the
appropriate management and maintenance
of the Lhanbryde Flood Alleviation Scheme
3901
5 Findhorn, Nairn and Speyside 390 Lhanbryde Avoid flood risk Inappropriate development Fluvial Avoid inappropriate development that
increases flood risk in Lhanbryde
3902
5 Findhorn, Nairn and Speyside 390 Lhanbryde Improve data and understanding Flood asset performance Fluvial Improve data and understanding of the
performance of the Lhanbryde Flood
Alleviation Scheme
3903
5 Findhorn, Nairn and Speyside 390 Lhanbryde Prepare for flooding Current and future flood risk Fluvial Prepare for current flood risk and future
flooding as a result of climate change in
Lhanbryde
3904
5 Findhorn, Nairn and Speyside 391 Lossiemouth Avoid flood risk Inappropriate development Coastal Avoid inappropriate development that
increases flood risk in Lossiemouth
3911
5 Findhorn, Nairn and Speyside 391 Lossiemouth Prepare for flooding Current and future flood risk Coastal Prepare for current flood risk and future
flooding as a result of climate change in
Lossiemouth
3912
5 Findhorn, Nairn and Speyside 391 Lossiemouth Reduce flood risk Overall flood risk Coastal Reduce the risk of coastal flooding to
Lossiemouth
3913
5 Findhorn, Nairn and Speyside 392 Elgin Avoid flood risk Existing flood scheme Fluvial Avoid an increase in flood risk by the
appropriate management and maintenance
of the Elgin Flood Protection Scheme
3921
5 Findhorn, Nairn and Speyside 392 Elgin Avoid flood risk Inappropriate development Fluvial & Pluvial Avoid inappropriate development that
increases flood risk in Elgin
3922
5 Findhorn, Nairn and Speyside 392 Elgin Improve data and understanding Flood asset performance Fluvial Improve data and understanding of the
performance of the flood protection assets
in Elgin
3923
5 Findhorn, Nairn and Speyside 392 Elgin Prepare for flooding Current and future flood risk Fluvial & Pluvial Prepare for current flood risk and future
flooding as a result of climate change in
Elgin
3924
5 Findhorn, Nairn and Speyside 392 Elgin Reduce flood risk Overall flood risk Pluvial Reduce the risk of surface water flooding in
Elgin
3925
#OFFICIALPage 346

Page 347

OFFICIAL#
5 Findhorn, Nairn and Speyside 393 Garmouth Avoid flood risk Inappropriate development Fluvial & Coastal Avoid inappropriate development that
increases flood risk in Garmouth
3931
5 Findhorn, Nairn and Speyside 393 Garmouth Prepare for flooding Current and future flood risk Fluvial & Coastal Prepare for current flood risk and future
flooding as a result of climate change in
Garmouth
3932
5 Findhorn, Nairn and Speyside 394 Dalwhinnie Avoid flood risk Inappropriate development Fluvial Avoid inappropriate development that
increases flood risk in Dalwhinnie
3941
5 Findhorn, Nairn and Speyside 394 Dalwhinnie Improve data and understanding Flooding issues Fluvial Improve data and understanding of the risk
of river flooding in Dalwhinnie
3942
5 Findhorn, Nairn and Speyside 394 Dalwhinnie Prepare for flooding Current and future flood risk Fluvial Prepare for current flood risk and future
flooding as a result of climate change in
Dalwhinnie
3943
5 Findhorn, Nairn and Speyside 395 Kingussie Avoid flood risk Inappropriate development Fluvial Avoid inappropriate development that
increases flood risk in Kingussie
3951
5 Findhorn, Nairn and Speyside 395 Kingussie Prepare for flooding Current and future flood risk Fluvial Prepare for current flood risk and future
flooding as a result of climate change in
Kingussie
3952
5 Findhorn, Nairn and Speyside 395 Kingussie Reduce flood risk Overall flood risk Fluvial Reduce the risk of flooding from the Gynack
Burn in Kingussie
3953
5 Findhorn, Nairn and Speyside 396 Aviemore Avoid flood risk Inappropriate development Fluvial & Pluvial Avoid inappropriate development that
increases flood risk in Aviemore
3961
5 Findhorn, Nairn and Speyside 396 Aviemore Prepare for flooding Current and future flood risk Fluvial & Pluvial Prepare for current flood risk and future
flooding as a result of climate change in
Aviemore
3962
5 Findhorn, Nairn and Speyside 396 Aviemore Reduce flood risk Overall flood risk Fluvial Reduce the risk of flooding from the River
Spey and Aviemore Burn in Aviemore
3963
5 Findhorn, Nairn and Speyside 397 Rothes Avoid flood risk Inappropriate development Fluvial & Pluvial Avoid inappropriate development that
increases flood risk in Rothes
3971
5 Findhorn, Nairn and Speyside 397 Rothes Avoid flood risk Existing flood scheme Fluvial Avoid an increase in flood risk by the
appropriate management and maintenance
of the Rothes Flood Prevention Schemes
3972
5 Findhorn, Nairn and Speyside 397 Rothes Improve data and understanding Flood asset performance Fluvial Improve data and understanding of the
performance of the flood protection assets
in Rothes
3973
5 Findhorn, Nairn and Speyside 397 Rothes Prepare for flooding Current and future flood risk Fluvial & Pluvial Prepare for current flood risk and future
flooding as a result of climate change in
Rothes
3974
5 Findhorn, Nairn and Speyside 397 Rothes Reduce flood risk Overall flood risk Pluvial Reduce the risk of surface water flooding to
Rothes
3975
5 Findhorn, Nairn and Speyside 420 Kinloss Avoid flood risk Inappropriate development Pluvial, Fluvial & Coastal Avoid inappropriate development that
increases flood risk in Kinloss
4201
5 Findhorn, Nairn and Speyside 420 Kinloss Prepare for flooding Current and future flood risk Pluvial, Fluvial & Coastal Prepare for current flood risk and future
flooding as a result of climate change in
Kinloss
4202
#OFFICIALPage 347

Page 348

OFFICIAL#
5 Findhorn, Nairn and Speyside 420 Kinloss Improve data and understanding Inappropriate development Pluvial, Fluvial & Coastal Improve understanding of the risk of
surface water, river and coastal flooding in
Kinloss
4203
5 Findhorn, Nairn and Speyside 421 Dallas Avoid flood risk Inappropriate development Fluvial Avoid inappropriate development that
increases flood risk in Dallas
4211
5 Findhorn, Nairn and Speyside 421 Dallas Avoid flood risk Existing flood scheme Fluvial Avoid an increase in flood risk by the
appropriate management and maintenance
of the Dallas Flood Prevention Scheme
4212
5 Findhorn, Nairn and Speyside 421 Dallas Improve data and understanding Flood asset performance Fluvial Improve data and understanding of the
performance of the flood protection asset
in Dallas
4213
5 Findhorn, Nairn and Speyside 421 Dallas Prepare for flooding Current and future flood risk Fluvial Prepare for current flood risk and future
flooding as a result of climate change in
Dallas
4214
5 Findhorn, Nairn and Speyside 427 Forres Avoid flood risk Existing flood scheme Fluvial Avoid an increase in flood risk by the
appropriate management and maintenance
of the Forres (Burn of Mosset) Flood
Prevention Scheme 2005 and the Forres
(Findhorn and Pilmuir) Flood Prevention
Scheme 2008
4271
5 Findhorn, Nairn and Speyside 427 Forres Avoid flood risk Inappropriate development Fluvial & Pluvial Avoid inappropriate development that
increases flood risk in Forres
4272
5 Findhorn, Nairn and Speyside 427 Forres Improve data and understanding Flood asset performance Fluvial Improve data and understanding of the
performance of the flood protection assets
in Forres
4273
5 Findhorn, Nairn and Speyside 427 Forres Prepare for flooding Current and future flood risk Fluvial & Pluvial Prepare for current flood risk and future
flooding as a result of climate change in
Forres
4274
5 Findhorn, Nairn and Speyside 427 Forres Reduce flood risk Overall flood risk Pluvial Reduce the risk of surface water flooding in
Forres
4275
5 Findhorn, Nairn and Speyside 428 Nairn Avoid flood risk Inappropriate development Pluvial, Fluvial & Coastal Avoid inappropriate development that
increases flood risk in Nairn
4281
5 Findhorn, Nairn and Speyside 428 Nairn Prepare for flooding Current and future flood risk Pluvial, Fluvial & Coastal Prepare for current flood risk and future
flooding as a result of climate change in
Nairn
4282
5 Findhorn, Nairn and Speyside 428 Nairn Reduce flood risk Overall flood risk Fluvial & Coastal Reduce the risk of flooding from the sea,
River Nairn, Auldearn Burn and Alton Burn
in Nairn
4283
5 Findhorn, Nairn and Speyside 428 Nairn Reduce flood risk Overall flood risk Pluvial Reduce the risk of surface water flooding in
Nairn
4284
5 Findhorn, Nairn and Speyside 432 Aberlour Avoid flood risk Existing flood scheme Fluvial Avoid an increase in flood risk by the
appropriate management and maintenance
of the Aberlour - Moray Flood Prevention
Scheme 1984
4321
5 Findhorn, Nairn and Speyside 432 Aberlour Avoid flood risk Inappropriate development Fluvial & Pluvial Avoid inappropriate development that
increases flood risk in Aberlour
4322
#OFFICIALPage 348

Page 349

OFFICIAL#
5 Findhorn, Nairn and Speyside 432 Aberlour Improve data and understanding Flood asset performance Fluvial Improve data and understanding of the
Aberlour - Moray Flood Prevention Scheme
1984
4323
5 Findhorn, Nairn and Speyside 432 Aberlour Prepare for flooding Current and future flood risk Fluvial & Pluvial Prepare for current flood risk and future
flooding as a result of climate change in
Aberlour
4324
5 Findhorn, Nairn and Speyside 432 Aberlour Reduce flood risk Overall flood risk Pluvial Reduce the risk of surface water flooding to
Aberlour
4325
5 Findhorn, Nairn and Speyside 434 Nethy Bridge Avoid flood risk Inappropriate development Fluvial Avoid inappropriate development that
increases flood risk in Nethy Bridge
4341
5 Findhorn, Nairn and Speyside 434 Nethy Bridge Improve data and understanding Flooding issues Fluvial Improve data and understanding of the risk
of flooding from the River Nethy in Nethy
Bridge
4342
5 Findhorn, Nairn and Speyside 434 Nethy Bridge Prepare for flooding Current and future flood risk Fluvial Prepare for current flood risk and future
flooding as a result of climate change in
Nethy Bridge
4343
5 Findhorn, Nairn and Speyside 443 Newtonmore Avoid flood risk Inappropriate development Pluvial Avoid inappropriate development that
increases flood risk in Newtonmore
4431
5 Findhorn, Nairn and Speyside 443 Newtonmore Prepare for flooding Current and future flood risk Pluvial Prepare for current flood risk and future
flooding as a result of climate change in
Newtonmore
4432
5 Findhorn, Nairn and Speyside 443 Newtonmore Reduce flood risk Overall flood risk Pluvial Reduce the risk of surface water flooding in
Newtonmore
4433
5 Findhorn, Nairn and Speyside 463 Kingston Avoid flood risk Inappropriate development Coastal Avoid inappropriate development that
increases flood risk in Kingston
4631
5 Findhorn, Nairn and Speyside 463 Kingston Prepare for flooding Current and future flood risk Coastal Prepare for current flood risk and future
flooding as a result of climate change in
Kingston
4632
5 Findhorn, Nairn and Speyside 9991 Seatown, LossiemouthAvoid flood risk Inappropriate development Coastal Avoid inappropriate development that
increases flood risk in the Seatown area of
Lossiemouth
99911
5 Findhorn, Nairn and Speyside 9991 Seatown, LossiemouthPrepare for flooding Current and future flood risk Coastal Prepare for current flood risk and future
flooding as a result of climate change in the
Seatown area of Lossiemouth
99912
5 Findhorn, Nairn and Speyside 9991 Seatown, LossiemouthReduce flood risk Overall flood risk Coastal Reduce the risk of coastal flooding to the
Seatown area of Lossiemouth
99913
5 Findhorn, Nairn and Speyside 9992 Newmill (Nairn) Avoid flood risk Inappropriate development Fluvial Avoid inappropriate development that
increases flood risk in Newmill
99921
5 Findhorn, Nairn and Speyside 9992 Newmill (Nairn) Prepare for flooding Current and future flood risk Fluvial Prepare for current flood risk and future
flooding as a result of climate change in
Newmill
99922
5 Findhorn, Nairn and Speyside 9992 Newmill (Nairn) Reduce flood risk Overall flood risk Fluvial Reduce the risk of flooding in Newmill from
the Auldearn Burn
99923
#OFFICIALPage 349

Page 350

Page 350

Page 351

Page 351

Page 352

Target area ID Local authority Target area name Action_ID Action type General description (called 'action' in
final target area datasheets)
Local detail (called 'description' in final
target area datasheets)
Timing Coordination Delivery Lead Indicative Delivery Funding Co-ordination Local Plan Descritption.
389 Moray Hopeman 38902 Sewer flood risk assessment The volume of water that would
overwhelm the sewer system and cause
flooding from man-holes or inside our
homes is to be assessed, to support
understanding of the performance of the
urban drainage network
Scottish Water will carry out an
assessment of sewer flood risk within the
highest priority sewer catchments, which
includes Lossiemouth sewer catchment in
this target area. This will help to improve
knowledge and understanding of
potential surface water flood risk.
Funding for this action is secured through
Scottish Water's strategic planning
commitments.
2 The action delivery lead is Scottish Water
in coordination with the local authority
and SEPA.
Scottish Water 2025-2027 Funding for this action is secured within
Scottish Water's business plan
Outputs of this modelling assessment will
be shared with local authorities and SEPA
Scottish Water will undertake a modelling
assessment in the Lossiemouth sewer
catchment to improve knowledge and
understanding of flood risk in this area as
required under Section 16 of the Flood
Risk Management (Scotland) Act 2009
390 Moray Lhanbryde 39003 Sewer flood risk assessment The volume of water that would
overwhelm the sewer system and cause
flooding from man-holes or inside our
homes is to be assessed, to support
understanding of the performance of the
urban drainage network
Scottish Water will carry out an
assessment of sewer flood risk within the
highest priority sewer catchments, which
includes Lossiemouth sewer catchment in
this target area. This will help to improve
knowledge and understanding of
potential surface water flood risk.
Funding for this action is secured through
Scottish Water's strategic planning
commitments.
2 The action delivery lead is Scottish Water
in coordination with the local authority
and SEPA.
Scottish Water 2025-2027 Funding for this action is secured within
Scottish Water's business plan
Outputs of this modelling assessment will
be shared with local authorities and SEPA
Scottish Water will undertake a modelling
assessment in the Lossiemouth sewer
catchment to improve knowledge and
understanding of flood risk in this area as
required under Section 16 of the Flood
Risk Management (Scotland) Act 2009
391 Moray Lossiemouth 39101 Sewer flood risk assessment The volume of water that would
overwhelm the sewer system and cause
flooding from man-holes or inside our
homes is to be assessed, to support
understanding of the performance of the
urban drainage network
Scottish Water will carry out an
assessment of sewer flood risk within the
highest priority sewer catchments, which
includes Lossiemouth sewer catchment in
this target area. This will help to improve
knowledge and understanding of
potential surface water flood risk.
Funding for this action is secured through
Scottish Water's strategic planning
commitments.
2 The action delivery lead is Scottish Water
in coordination with the local authority
and SEPA.
Scottish Water 2025-2027 Funding for this action is secured within
Scottish Water's business plan
Outputs of this modelling assessment will
be shared with local authorities and SEPA
Scottish Water will undertake a modelling
assessment in the Lossiemouth sewer
catchment to improve knowledge and
understanding of flood risk in this area as
required under Section 16 of the Flood
Risk Management (Scotland) Act 2009
392 Moray Elgin 39206 Sewer flood risk assessment The volume of water that would
overwhelm the sewer system and cause
flooding from man-holes or inside our
homes is to be assessed, to support
understanding of the performance of the
urban drainage network
Scottish Water will carry out an
assessment of sewer flood risk within the
highest priority sewer catchments, which
includes Lossiemouth sewer catchment in
this target area. This will help to improve
knowledge and understanding of
potential surface water flood risk.
Funding for this action is secured through
Scottish Water's strategic planning
commitments.
2 The action delivery lead is Scottish Water
in coordination with the local authority
and SEPA.
Scottish Water 2025-2027 Funding for this action is secured within
Scottish Water's business plan
Outputs of this modelling assessment will
be shared with local authorities and SEPA
Scottish Water will undertake a modelling
assessment in the Lossiemouth sewer
catchment to improve knowledge and
understanding of flood risk in this area as
required under Section 16 of the Flood
Risk Management (Scotland) Act 2009
398 Moray Portgordon 39802 Sewer flood risk assessment The volume of water that would
overwhelm the sewer system and cause
flooding from man-holes or inside our
homes is to be assessed, to support
understanding of the performance of the
urban drainage network
Scottish Water will carry out an
assessment of sewer flood risk within the
highest priority sewer catchments, which
includes Buckie Moray East sewer
catchment in this target area. This will
help to improve knowledge and
understanding of potential surface water
flood risk. Funding for this action is
secured through Scottish Water's
strategic planning commitments.
2 The action delivery lead is Scottish Water
in coordination with the local authority
and SEPA.
Scottish Water 2023-2025 Funding for this action is secured within
Scottish Water's business plan
Outputs of this modelling assessment will
be shared with local authorities and SEPA
Scottish Water will undertake a modelling
assessment in the Buckie (Moray East)
sewer catchment to improve knowledge
and understanding of flood risk in this
area as required under Section 16 of the
Flood Risk Management (Scotland) Act
2009
420 Moray Kinloss 42001 Sewer flood risk assessment The volume of water that would
overwhelm the sewer system and cause
flooding from man-holes or inside our
homes is to be assessed, to support
understanding of the performance of the
urban drainage network
Scottish Water will carry out an
assessment of sewer flood risk within the
highest priority sewer catchments, which
includes Forres sewer catchment in this
target area. This will help to improve
knowledge and understanding of
potential surface water flood risk.
Funding for this action is secured through
Scottish Water's strategic planning
commitments.
2 The action delivery lead is Scottish Water
in coordination with the local authority
and SEPA.
Scottish Water 2025-2027 Funding for this action is secured within
Scottish Water's business plan
Outputs of this modelling assessment will
be shared with local authorities and SEPA
Scottish Water will undertake a modelling
assessment in the Forres sewer
catchment to improve knowledge and
understanding of flood risk in this area as
required under Section 16 of the Flood
Risk Management (Scotland) Act 2009
427 Moray Forres 42703 Sewer flood risk assessment The volume of water that would
overwhelm the sewer system and cause
flooding from man-holes or inside our
homes is to be assessed, to support
understanding of the performance of the
urban drainage network
Scottish Water will carry out an
assessment of sewer flood risk within the
highest priority sewer catchments, which
includes Forres sewer catchment in this
target area. This will help to improve
knowledge and understanding of
potential surface water flood risk.
Funding for this action is secured through
Scottish Water's strategic planning
commitments.
2 The action delivery lead is Scottish Water
in coordination with the local authority
and SEPA.
Scottish Water 2025-2027 Funding for this action is secured within
Scottish Water's business plan
Outputs of this modelling assessment will
be shared with local authorities and SEPA
Scottish Water will undertake a modelling
assessment in the Forres sewer
catchment to improve knowledge and
understanding of flood risk in this area as
required under Section 16 of the Flood
Risk Management (Scotland) Act 2009
455 Moray Buckie and Portessie 45506 Sewer flood risk assessment The volume of water that would
overwhelm the sewer system and cause
flooding from man-holes or inside our
homes is to be assessed, to support
understanding of the performance of the
urban drainage network
Scottish Water will carry out an
assessment of sewer flood risk within the
highest priority sewer catchments, which
includes Buckie Moray East sewer
catchment in this target area. This will
help to improve knowledge and
understanding of potential surface water
flood risk. Funding for this action is
secured through Scottish Water's
strategic planning commitments.
2 The action delivery lead is Scottish Water
in coordination with the local authority
and SEPA.
Scottish Water 2023-2025 Funding for this action is secured within
Scottish Water's business plan
Outputs of this modelling assessment will
be shared with local authorities and SEPA
Scottish Water will undertake a modelling
assessment in the Buckie (Moray East)
sewer catchment to improve knowledge
and understanding of flood risk in this
area as required under Section 16 of the
Flood Risk Management (Scotland) Act
2009
9991 Moray Seatown, Lossiemouth 999104 Sewer flood risk assessment The volume of water that would
overwhelm the sewer system and cause
flooding from man-holes or inside our
homes is to be assessed, to support
understanding of the performance of the
urban drainage network
Scottish Water will carry out an
assessment of sewer flood risk within the
highest priority sewer catchments, which
includes Lossiemouth sewer catchment in
this target area. This will help to improve
knowledge and understanding of
potential surface water flood risk.
Funding for this action is secured through
Scottish Water's strategic planning
commitments.
2 The action delivery lead is Scottish Water
in coordination with the local authority
and SEPA.
Scottish Water 2025-2027 Funding for this action is secured within
Scottish Water's business plan
Outputs of this modelling assessment will
be shared with local authorities and SEPA
Scottish Water will undertake a modelling
assessment in the Lossiemouth sewer
catchment to improve knowledge and
understanding of flood risk in this area as
required under Section 16 of the Flood
Risk Management (Scotland) Act 2009
Page 352

Page 353

LPD name Target area ID Local authority Target area
name Action_ID Action type
General description (called
'action' in final target area
datasheets)
Local detail (called
'description' in final target
area datasheets)
Local Detail Update for
SEPA's FRM Review Actions
and Kirkconnel SMAM
Action
Cycle Coordination (as published in
the consultation in 2021) Action Delivery Lead SEPA Actions
Coordination Statement
SEPA Actions Detailed
Timing
SEPA Actions funding
statement
SEPA suggested coordination
statement for
Council/Others Actions
Findhorn, Nairn
and Speyside
389 Moray Hopeman 38903 Flood warning
maintenance
The Floodline flood
warning service is to be
kept operational through
maintenance to the
existing system and
updates being undertaken
as required.
SEPA should maintain the
Moray Firth coastal flood
warning scheme.
2 The action delivery lead is
SEPA and coordination will
be determined once the
actions have been
finalised.
SEPA SEPA will maintain the
Moray Firth coastal flood
warning scheme. SEPA will
continue to raise
awareness of flood
warning, and engage with
communities about the
service when required.
Ongoing SEPA’s role in this action is
funded by Scottish
Government through SEPA’s
grant in aid settlement.
Findhorn, Nairn
and Speyside
391 Moray Lossiemouth 39102 Strategic
mapping
improvements
SEPA will continue to
update flood maps based
on new information.
SEPA has undertaken
improved coastal
modelling in this target
area including taking
account of the impact of
waves on coastal flooding.
We will complete and
publish the outcomes of
this modelling work to
inform decision making
with respect to flooding at
the coast.
2 The action delivery lead is
SEPA and coordination will
be determined once the
actions have been
finalised.
SEPA SEPA will work with the local
authority on the potential to
coordinate the flood map
update with any other
actions being carried out to
understand or reduce coastal
flooding.
2023-2024 SEPA’s role in this action is
funded by Scottish
Government through SEPA’s
grant in aid settlement.
Findhorn, Nairn
and Speyside
391 Moray Lossiemouth 39103 Flood warning
maintenance
The Floodline flood
warning service is to be
kept operational through
maintenance to the
existing system and
updates being undertaken
as required.
SEPA should maintain the
Moray Firth coastal flood
warning scheme.
2 The action delivery lead is
SEPA and coordination will
be determined once the
actions have been
finalised.
SEPA SEPA will work with the local
authorities on the potential
to use information from any
flood studies around the
Moray Firth coast to inform
ongoing flood warning. SEPA
will continue to raise
awareness of flood warning,
and engage with
communities about the
service when required.
Ongoing SEPA’s role in this action is
funded by Scottish
Government through SEPA’s
grant in aid settlement.
Findhorn, Nairn
and Speyside
392 Moray Elgin 39208 Flood warning
maintenance
The Floodline flood
warning service is to be
kept operational through
maintenance to the
existing system and
updates being undertaken
as required.
SEPA should maintain the
River Lossie flood warning
scheme.
2 The action delivery lead is
SEPA and coordination will
be determined once the
actions have been
finalised.
SEPA SEPA will work with Moray
Council on the potential to
use information from the
flood studies to inform
ongoing flood warning. SEPA
will continue to raise
awareness of flood warning,
and engage with
communities about the
service when required.
Ongoing SEPA’s role in this action is
funded by Scottish
Government through SEPA’s
grant in aid settlement.
Findhorn, Nairn
and Speyside
393 Moray Garmouth 39302 Flood warning
maintenance
The Floodline flood
warning service is to be
kept operational through
maintenance to the
existing system and
updates being undertaken
as required.
SEPA should maintain the
River Spey and the Moray
Firth coastal flood warning
schemes.
2 The action delivery lead is
SEPA and coordination will
be determined once the
actions have been
finalised.
SEPA SEPA will work with the local
authorities on the potential
to use information from any
flood studies in the Spey
catchment to inform ongoing
flood warning. SEPA will
continue to raise awareness
of flood warning, and engage
with communities about the
service when required.
Ongoing SEPA’s role in this action is
funded by Scottish
Government through SEPA’s
grant in aid settlement.
Findhorn, Nairn
and Speyside
397 Moray Rothes 39706 Flood warning
maintenance
The Floodline flood
warning service is to be
kept operational through
maintenance to the
existing system and
updates being undertaken
as required.
SEPA should maintain the
River Spey flood warning
scheme.
2 The action delivery lead is
SEPA and coordination will
be determined once the
actions have been
finalised.
SEPA SEPA will work with the local
authorities on the potential
to use information from any
flood studies in the Spey
catchment to inform ongoing
flood warning. SEPA will
continue to raise awareness
of flood warning, and engage
with communities about the
service when required.
Ongoing SEPA’s role in this action is
funded by Scottish
Government through SEPA’s
grant in aid settlement.
Page 353

Page 354

North East 398 Moray Portgordon 39801 Strategic
mapping
improvements
SEPA will continue to
update flood maps based
on new information.
SEPA has undertaken
improved coastal
modelling in this target
area including taking
account of the impact of
waves on coastal flooding.
We will complete and
publish the outcomes of
this modelling work to
inform decision making
with respect to flooding at
the coast.
2 The action delivery lead is
SEPA and coordination will
be determined once the
actions have been
finalised.
SEPA SEPA will work with the local
authority on the potential to
coordinate the flood map
update with any other
actions being carried out to
understand or reduce coastal
flooding.
2023-2024 SEPA’s role in this action is
funded by Scottish
Government through SEPA’s
grant in aid settlement.
North East 398 Moray Portgordon 39804 Flood warning
maintenance
The Floodline flood
warning service is to be
kept operational through
maintenance to the
existing system and
updates being undertaken
as required.
SEPA should maintain the
Moray Firth coastal flood
warning scheme.
2 The action delivery lead is
SEPA and coordination will
be determined once the
actions have been
finalised.
SEPA SEPA will work with the local
authorities on the potential
to use information from any
flood studies around the
Moray Firth coast to inform
ongoing flood warning. SEPA
will continue to raise
awareness of flood warning,
and engage with
communities about the
service when required.
Ongoing SEPA’s role in this action is
funded by Scottish
Government through SEPA’s
grant in aid settlement.
North East 404 Moray Keith 40401 Flood warning
maintenance
The Floodline flood
warning service is to be
kept operational through
maintenance to the
existing system and
updates being undertaken
as required.
SEPA should maintain the
River Deveron flood
warning scheme. The
scheme should be
investigated for
improvement and/or
recalibration.
2 The action delivery lead is
SEPA and coordination will
be determined once the
actions have been
finalised.
SEPA SEPA will maintain the
River Deveron flood
warning scheme. SEPA will
continue to raise
awareness of flood
warning, and engage with
communities about the
service when required.
Second half of cycle SEPA’s role in this action is
funded by Scottish
Government through SEPA’s
grant in aid settlement.
Findhorn, Nairn
and Speyside
420 Moray Kinloss 42002 Flood warning
maintenance
The Floodline flood
warning service is to be
kept operational through
maintenance to the
existing system and
updates being undertaken
as required.
SEPA should maintain the
Moray Firth coastal flood
warning scheme.
2 The action delivery lead is
SEPA and coordination will
be determined once the
actions have been
finalised.
SEPA SEPA will work with the local
authorities on the potential
to use information from any
flood studies around the
Moray Firth coast to inform
ongoing flood warning. SEPA
will continue to raise
awareness of flood warning,
and engage with
communities about the
service when required.
Ongoing SEPA’s role in this action is
funded by Scottish
Government through SEPA’s
grant in aid settlement.
Findhorn, Nairn
and Speyside
421 Moray Dallas 42102 Flood warning
maintenance
The Floodline flood
warning service is to be
kept operational through
maintenance to the
existing system and
updates being undertaken
as required.
SEPA should maintain the
River Lossie flood warning
scheme.
2 The action delivery lead is
SEPA and coordination will
be determined once the
actions have been
finalised.
SEPA SEPA will work with Moray
Council on the potential to
use information from the
flood studies to inform
ongoing flood warning. SEPA
will continue to raise
awareness of flood warning,
and engage with
communities about the
service when required.
Ongoing SEPA’s role in this action is
funded by Scottish
Government through SEPA’s
grant in aid settlement.
Findhorn, Nairn
and Speyside
427 Moray Forres 42705 Flood warning
maintenance
The Floodline flood
warning service is to be
kept operational through
maintenance to the
existing system and
updates being undertaken
as required.
SEPA should maintain the
River Findhorn flood
warning scheme.
2 The action delivery lead is
SEPA and coordination will
be determined once the
actions have been
finalised.
SEPA SEPA will work with Moray
Council on the potential to
use information from the
flood study to inform
ongoing flood warning. SEPA
will continue to raise
awareness of flood warning,
and engage with
communities about the
service when required.
Ongoing SEPA’s role in this action is
funded by Scottish
Government through SEPA’s
grant in aid settlement.
Page 354

Page 355

Findhorn, Nairn
and Speyside
432 Moray Aberlour 43204 Flood warning
maintenance
The Floodline flood
warning service is to be
kept operational through
maintenance to the
existing system and
updates being undertaken
as required.
SEPA should maintain the
River Spey flood warning
scheme.
2 The action delivery lead is
SEPA and coordination will
be determined once the
actions have been
finalised.
SEPA SEPA will work with the local
authorities on the potential
to use information from any
flood studies in the Spey
catchment to inform ongoing
flood warning. SEPA will
continue to raise awareness
of flood warning, and engage
with communities about the
service when required.
Ongoing SEPA’s role in this action is
funded by Scottish
Government through SEPA’s
grant in aid settlement.
North East 444 Moray Newmill (Keith) 44402 Flood warning
maintenance
The Floodline flood
warning service is to be
kept operational through
maintenance to the
existing system and
updates being undertaken
as required.
SEPA should maintain the
River Deveron flood
warning scheme. The
scheme should be
investigated for
improvement and/or
recalibration.
2 The action delivery lead is
SEPA and coordination will
be determined once the
actions have been
finalised.
SEPA SEPA will maintain the
River Deveron flood
warning scheme. SEPA will
continue to raise
awareness of flood
warning, and engage with
communities about the
service when required.
Second half of cycle SEPA’s role in this action is
funded by Scottish
Government through SEPA’s
grant in aid settlement.
North East 455 Moray Buckie and
Portessie
45508 Strategic
mapping
improvements
SEPA will continue to
update flood maps based
on new information.
SEPA has undertaken
improved coastal
modelling in this target
area including taking
account of the impact of
waves on coastal flooding.
We will complete and
publish the outcomes of
this modelling work to
inform decision making
with respect to flooding at
the coast.
2 The action delivery lead is
SEPA and coordination will
be determined once the
actions have been
finalised.
SEPA SEPA will work with the local
authority on the potential to
coordinate the flood map
update with any other
actions being carried out to
understand or reduce coastal
flooding.
2023-2024 SEPA’s role in this action is
funded by Scottish
Government through SEPA’s
grant in aid settlement.
North East 455 Moray Buckie and
Portessie
45509 Flood warning
maintenance
The Floodline flood
warning service is to be
kept operational through
maintenance to the
existing system and
updates being undertaken
as required.
SEPA should maintain the
Moray Firth coastal flood
warning scheme.
2 The action delivery lead is
SEPA and coordination will
be determined once the
actions have been
finalised.
SEPA SEPA will work with the local
authorities on the potential
to use information from any
flood studies around the
Moray Firth coast to inform
ongoing flood warning. SEPA
will continue to raise
awareness of flood warning,
and engage with
communities about the
service when required.
Ongoing SEPA’s role in this action is
funded by Scottish
Government through SEPA’s
grant in aid settlement.
Findhorn, Nairn
and Speyside
463 Moray Kingston 46303 Flood warning
maintenance
The Floodline flood
warning service is to be
kept operational through
maintenance to the
existing system and
updates being undertaken
as required.
SEPA should maintain the
River Spey and the Moray
Firth coastal flood warning
schemes.
2 The action delivery lead is
SEPA and coordination will
be determined once the
actions have been
finalised.
SEPA SEPA will work with the local
authorities on the potential
to use information from any
flood studies in the Spey
catchment to inform ongoing
flood warning. SEPA will
continue to raise awareness
of flood warning, and engage
with communities about the
service when required.
Ongoing SEPA’s role in this action is
funded by Scottish
Government through SEPA’s
grant in aid settlement.
Findhorn, Nairn
and Speyside
9991 Moray Seatown,
Lossiemouth
999105 Flood warning
maintenance
The Floodline flood
warning service is to be
kept operational through
maintenance to the
existing system and
updates being undertaken
as required.
SEPA should maintain the
Moray Firth coastal flood
warning scheme.
2 The action delivery lead is
SEPA and coordination will
be determined once the
actions have been
finalised.
SEPA SEPA will work with the local
authorities on the potential
to use information from any
flood studies around the
Moray Firth coast to inform
ongoing flood warning. SEPA
will continue to raise
awareness of flood warning,
and engage with
communities about the
service when required.
Ongoing SEPA’s role in this action is
funded by Scottish
Government through SEPA’s
grant in aid settlement.
Page 355

Page 356

Findhorn, Nairn
and Speyside
9991 Moray Seatown,
Lossiemouth
999106 Strategic
mapping
improvements
SEPA will continue to
update flood maps based
on new information.
SEPA has undertaken
improved coastal
modelling in this target
area including taking
account of the impact of
waves on coastal flooding.
We will complete and
publish the outcomes of
this modelling work to
inform decision making
with respect to flooding at
the coast.
2 The action delivery lead is
SEPA and coordination will
be determined once the
actions have been
finalised.
SEPA SEPA will work with the local
authority on the potential to
coordinate the flood map
update with any other
actions being carried out to
understand or reduce coastal
flooding.
2023-2024 SEPA’s role in this action is
funded by Scottish
Government through SEPA’s
grant in aid settlement.
Page 356

Page 357

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 15 NOVEMBER 2022 
SUBJECT: UPDATE ON COUNCIL SANDBAG POLICY AND PROPERTY
PROTECTION PRODUCTS 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To ask the Committee to approve a revised policy on the issue of sandbags. 
1.2 This report is submitted to Committee in terms of Section III (F) (32) of the
Council's Administrative Scheme relating to emergency planning and home
defence. 
2. RECOMMENDATION 
2.1 It is recommended that Committee agree: 
(i) the updated Council policy on the issue of sandbags and property
protection set out in Appendix 2; and
(ii) to note the property level protection products that were previously
sanctioned at committee are now available to purchase. 
3. BACKGROUND 
3.1 Multiple individuals and agencies have responsibilities in relation to flooding.
The Council and other statutory agencies such as SEPA have a responsibility
to manage the risk of flooding, both on a long term and emergency response
basis. During severe flooding the council works with other agencies as part of
its emergency response – although there is no legal requirement to provide
flood protection such as sandbags. In these instances the Council does
distribute sandbags to strategic collection points. Property owners are
responsible for protecting their own property from flooding. 
3.2 The current Council Policy with regards to the issue of sandbags (Appendix
1) was agreed at a meeting of this Committee on 25 November 2014 (Para 8
of the Minute refers). 
Item 8
Page 357

Page 358

3.3 The Council receives a number of requests for sandbags and sandbagging
assistance in the build up to and during flooding events. To assist local
communities the Council aims to distribute pallets of sand bags to strategic
points to allow the public to help themselves during flood events. Locations
are advertised by the issue of press releases, updates on the Council’s
website or via the Council’s Contact Centre. 
3.4 The speed and timing of any flood event can result in flooding occurring
before the Council has had time to respond and provide sandbags at strategic
locations. So whilst the Council will help, of necessity that help is limited so
property owners are encouraged to make their own preparations where they
are at risk of flooding. 
3.5 To assist local residents, the Council strongly recommends local residents
engage with their local Community Council to consider more resilience
planning in areas where no current arrangements are in place. The Council
will fully support to help develop local resilience plans and provide assistance
were possible. 
3.6 A report was presented to this Committee on 7 December 2021 (Para 13 of
the minute refers), with regards to proposals for the Council to make property
level protection products available, at cost price, to Moray residents who may
be affected by flooding. Following consideration the Committee agreed the
proposed scheme to purchase £5,000 of Property Level Protection Products
for sale to the public and if demand was high, to purchase a further £15,000 of
products. 
3.7 The Council now has the initial £5,000 worth of property level flood protections
available and information on how these may be purchased will be advertised
on the Councils website. The success of this trial and update on sale of this
stock will be reported to a future committee before any further products are
purchased by the Council. 
3.8 Following on from this approved report, it was felt an opportune time to review
the 2014 policy with regards to the provision of Sandbags and Sandbagging
Operations and encompass into a new proposed combined policy on;
Property Protection, the Provision of Sandbags and Sandbagging Operations. 
3.9 The proposed updated policy is set out in full in Appendix 2. The key points
within the updated policy are as follows: 
• A clear statement of who is responsible for protecting personal property
during a flood event.
• Providing Moray residents with advice in regards to what property level
products are available to purchase from the Council.
• Setting out how these products may be ordered.
• Encouraging people/communities to sign up to SEPA’s flood warning
service to receive automatic advance flood warnings for their area.
• Setting out the role of local community councils and resilience groups
in emergency resilience planning and that further Council support is
available for other local communities to consider developing their own
resilience plans. 
Page 358

Page 359

• Making it clear what the use of any distributed sandbags are for and
how these are to be disposed of once they have come into contact with
flood water. 
3.10 Specific web pages have been developed which detail all of the above and
are ready to go LIVE subject to proposed policy being approved. These pages
provide more detail in respect of the property protection products the Council
has purchased and details the cost, description and photographs of products
and how these may be ordered. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
“Empowering and Connecting Communities”. This report supports
building community capacity by supporting and encouraging self-help
during flooding events. 
(b) Policy and Legal
There are no policy or legal implication associated with the
recommendations in this report. 
(c) Financial implications
Whilst the Council incurs financial costs in delivering sandbags to local
communities, and removing them when not disposed of by residents,
there are no financial risks associated from this report. 
(d) Risk Implications
There are no risk implications as a result of this report. 
(e) Staffing Implications
None. 
(f) Property
There are no property implications associated directly arising from this
report. Whilst in a flood event there can be consequences for property,
the Council’s policy position continues to provide a proportionate
response. 
(g) Equalities/Socio Economic Impact
Equalities issues may arise in respect of groups who are unable to avail
themselves of sandbags via ‘self-help’ however, the proposed policy
does not preclude provision of direct help to such equalities groups. 
(h) Climate Change and Biodiversity Impacts
There are no climate change and biodiversity impacts as a result of this
report. 
Page 359

Page 360

(i) Consultations
The Depute Chief Executive (Economy, Environment and Finance),
Head of Environmental and Commercial Services, Legal Services
Manager, Head of Financial Services, Committee Services Officer (L
Rowan), and Equalities Officer have all been consulted and their
comments incorporated into this report. 
5. CONCLUSION 
5.1 This proposed combined policy on Property Protection, the Provision of
Sandbags and Sandbagging Operations sets out, given the context set
out in the report, that in the first instance it is the property owner’s
responsibility to protect their premises during a flood event. 
5.2 The report and policy highlights what the Council will do to assist Moray
residents and if approved will be more in line with recent experience, will
better guide officers and so ensure a consistent approach to requests
for sandbags and sandbagging operations. 
Author of Report: Mark Atherton, Roads Maintenance Manager
Background Papers: 
Ref:    SPMAN-524642768-805
Page 360

Page 361

APPENDIX 1 
Current Policy on the Provision of Sandbags and Sandbagging Operations 
The responsibility for protecting property during a flood rests with the property owner
and there is no statutory duty for a Local Authority to provide sandbags. However,
the Council may, where resources and priorities allow, react to anticipated or
reported incidents and provide assistance including sandbagging operations where
such action can reduce the flood inundation. 
For health and safety reasons, access to Council depots will be controlled and
limited. The Council may distribute pallets of sandbags to strategic points to allow
the public to help themselves during flooding events. Locations will be advised by,
for example, press releases, the Council’s web site or via the Contact Centre.
Individuals who, due to for example age or disability, need assistance with accessing
sandbags for self help at strategic points, should get in touch with the Council to
request assistance. 
The Council will not generally provide sandbags in advance to communities at risk of
flood inundation as a precautionary measure unless the forecast conditions and/or
SEPA indicate a high level of risk. 
Property owners are strongly advised to make prior preparations for protecting their
own property as flood incidents can occur with little warning and can be widespread. 
Any individual wishing to purchase sandbags for private use should do so from a
local builder’s merchants or garden centres. 
The Council encourages individuals to be prepared for emergencies, including
flooding. 
Information on preparing for emergencies is available at
www.readyscotland.org/athome/ and on flood awareness and preparation at
www.sepa.org.uk/flooding. 
There are more effective means of property level protection than sandbags and the
Council recommends consulting the independent Scottish Flood Forum
(www.scottishfloodforum.org) and seeking competent professional advice on which
products are most suitable for each individual property. 
The Council encourages people to sign up with SEPA’s flood warning service to
receive automatic advance flood warnings for their area – see
www.floodlinescotland.org.uk. 
Item 8
Page 361

Page 362

Page 362

Page 363

APPENDIX 2 
Proposed Policy on Property Protection, the Provision of Sandbags and
Sandbagging Operations
Multiple individuals and agencies have responsibilities in relation to flooding. The Council and other
statutory agencies such as SEPA have a responsibility to manage the risk of flooding, both on a long
term and emergency response basis. During severe flooding the Council works with other agencies
as part of its emergency response – although there is no legal requirement to provide flood
protection such as sandbags, in these instances the Council does distribute sandbags to strategic
collection points. Property owners are responsible for protecting their own property from flooding. 
Who is responsible for protecting your property?
As set out above, the responsibility for protecting property during a flood rests with the property
owner and there is no statutory duty for a Local Authority to provide sandbags. The Council suggests
that those living within areas identified at being at risk from flooding follow the advice of the
Scottish Environment Protection Agency (http://www.sepa.org.uk/flooding/) to protect their homes.
In addition, the Scottish Flood Forum (http://www.scottishfloodforum.org/) also provides useful
advice about how to prepare for a flood. 
The Council encourages residents who may be affected by flooding to sign up to SEPA’s flood
warning service to receive automatic advance flood warnings for their area.
What the Council can offer?
Property Flood protection advice and support
As identified above, the prime responsibility for the protection of properties against damage by
flooding rests with the owner of the property. Though it will not always be possible to prevent
flooding, there are products on the market which can be purchased to help reduce the risk of
damage.
Moray Council has a small selection of property flood protection products available for sale to the
public at cost price. The prices reflect the discounts that are available to the Council due to bulk
purchasing, and are likely to be less than can be obtained by individuals purchasing direct from
suppliers.
The products available are flood gates, vent guards and floodsaxs. Flood gates are used for
protecting against water ingress through doorways and come in different sizes to suit the door
opening. Vent guards are used to cover air vents, and come in two sizes. Floodsaxs are a lightweight,
easily stored and biodegradable alternative to sandbags, which come flat and contain an absorbent
polymer gel which expands on contact with water.
If you wish to obtain further details, including current prices, about any of these products, or wish to
place an order, please see www.moray.gov.uk/*for further details
Many other products are commercially available and in some cases may better suit your specific
needs. It is recommended that you compare products and prices before making a purchase.
Advice about how to best protect your property is available on the SEPA website along with a list of
flood prevention product providers.  The Scottish Flood Forum website also provides useful advice
about how to prepare for a flood. 
Item 8
Page 363

Page 364

The provision of sand bags
Sandbags should only be seen as a last resort in protecting properties from flooding and we would
advise that there are far better ways of protecting properties.
The Council may, where resources and priorities allow, react to anticipated or reported incidents and
provide assistance including sandbagging operations where such action can reduce the flood
inundation. However, transportation and the correct positioning of sandbags on a timely basis
(before flooding has occurred) often prove difficult, particularly in the event of widespread flooding
disruption.
The Council may distribute pallets of sandbags to strategic points to allow the public to help
themselves during flooding events. Locations will be advised by, for example, the issue of press
releases, updates on the Council’s website or via the Council’s Contact Centre. 
Individuals who, due to for example age or disability, need assistance with accessing sandbags for
self-help at strategic points should get in touch with the Council to request assistance. The Council
will not generally provide sandbags in advance to communities at risk of flood inundation as a
precautionary measure unless the forecast conditions and/or SEPA indicate a high level of risk.
The Council strongly recommends engaging with your local Community Council to consider more
resilience planning in areas where no current arrangements are in place, and will fully support and
engage to provide assistance were possible.
It is important to be aware that:
• It is the prime responsibility of the property owner to protect their premises
• If flooding is a regular threat at a particular location, please consider purchasing sandbags
from a builders’ merchant or trade supplier
• Residents should consider purchasing property flood protection products either through the
Council or other external suppliers 
• Sandbags are for emergency use only and they are offered to deal with real emergencies
rather than perceived ones
• Sandbags are for the protection of houses and business premises rather than sheds, garages
or outbuildings
• The Council will use its best endeavours to distribute sandbags to strategic points during
forecast flood events
• There is a limit of 20 sandbags per address
• There is no charge for sandbags provided for emergency purposes
• Hessian sandbags should be stored indoors, and polypropylene sandbags should be stored
out of sunlight, to maximise their life
• Only in circumstances where there is a lack of storage space or where they are causing a
'litter' nuisance, will sandbags be removed by the council
• Once sandbags have come in to contact with flood water, they should not be re-used as they
are considered to be contaminated.
• Once sandbags have become contaminated, it is the responsibility of the property owner to
arrange for their disposal.
Page 364

Page 365

Communications
-For those living within areas identified at risk of flooding follow the advice of the Scottish
Environment Protection Agency: (http://www.sepa.org.uk/flooding/) to protect their homes. 
-Advice on how to prepare for a flood: (http://www.scottishfloodforum.org/)
-property flood protection products available from the Council: www.moray.gov.uk/* for further
details. 
*full link to be established as part of final policy publication 
Page 365

Page 366

Page 366

Page 367

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE 
SERVICES COMMITTEE ON 15 NOVEMBER 2022 
SUBJECT: NATURE RESTORATION FUND LONG TERM PLAN 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND 
FINANCE 
1. REASON FOR REPORT 
1.1 The Committee is asked to approve delegated authority to the Head of
Economic Growth and Development to spend grant monies from the Nature
Restoration Fund, within the identified priority areas. 
1.2 This report is submitted to Committee in terms of Section III (F) (11) of the
Council's Scheme of Administration relating to exercising functions in relation
to parks, open spaces and woodland management and maintenance. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee:- 
(i) note the challenge of achieving the full benefit of the Nature
Restoration Fund each year, due to the short timescale between
receipt of the fund and requirement for all project to be
completed; 
(ii) agree to delegate authority to the Head of Economic Growth and
Development to spend direct grant monies from the Nature
Restoration Fund, within the identified priority areas, for the
remaining three years of the fund with annual progress reports
delivered to this Committee; and 
(iii) approve the approach outlined in Paras 5.7-5.9 recognising that
staffing constraints will limit the Council’s ability to develop
projects and funding bids to protect and enhance biodiversity. 
3. BACKGROUND 
Item 9
Page 367

Page 368

3.1 The Scottish Government’s Nature Restoration Fund was introduced in 2021
to address the twin crises of biodiversity loss and climate change.  The
purpose of the fund is to support actions that help nature recover by
enhancing biodiversity and local ecosystems and/or using nature based
solutions to mitigate and adapt to the climate emergency and its impacts. 
3.2 The fund will run for five years across several streams.  One stream, the
Edinburgh Process, has allocated £5 million each year in the first two years in
direct capital grants divided between all Scottish Local Authorities.  Other,
competitive, streams are administered by NatureScot and are open to local
authority applicants working in partnership with other organisations. 
3.3 Spending areas for the first two direct grant allocations were approved by
Planning and Regulatory Services Committee on 16 November 2021 (para 15
of the minute refers) and by Economic Development and Infrastructure
Services Committee on 6 September 2022 (para 8 of the minute refers). 
3.4 The Council has a duty under the Nature Conservation (Scotland) Act 2004 to
further the conservation of biodiversity when carrying out their duties and this
was reaffirmed by the Council agreeing to sign the Edinburgh Declaration on
10 August 2022 (para 21 of the minute refers). This fund presents a key
opportunity to deliver on this commitment and enable the recovery of nature
on Council land and other appropriate sites that would otherwise not take
place due to budget constraints. 
3.5 Supporting the recovery of local wildlife is very important to people. Not only
has Scotland almost lost 25% of its wildlife, but 11% of our species now face
extinction. Pressures include changes in land and sea use, climate change
impacts, pollution, over exploitation and invasive non-native species.
NatureScot recognises the underlying driver of these combined pressures as
stemming from people’s disconnect with nature and lack of recognition for its
value.   
4.  PRIORITY AREAS 
4.1 Priority areas for the Nature Restoration Fund in 2022/23 included: 
• Habitat and species restoration: Management for enhancement and
connectivity
• Freshwater restoration, including restoration of natural flows in rural
catchments
• Coastal and marine initiatives which promote restoration, recovery,
enhancement or resilience
• Control of invasive non-native species (INNS) impacting on nature
• Urban: Enhancing and connecting nature across, and between, towns
and cities. 
4.2 These may change slightly each year and following the publication of the new
Biodiversity Strategy for Scotland, but are fairly broad areas so should not
impact the identified priority areas listed below. 
Page 368

Page 369

4.3 Future direct grants received through the Nature Restoration Fund will be
used to progress the following project areas:
1. The Council’s action for pollinators: living lawns, wildflower meadows,
reducing the use of glyphosate based herbicides
2. Biodiversity enhancement of key nature sites (Millbuies and the Wards,
other locations as they are identified)
3. INNS removal (e.g. giant hogweed and Japanese knotweed along
Findhorn, Lossie and Spey rivers)
4. Actions arising from emerging habitat and species data and the
woodland strategy
5. Rain gardens at schools and council buildings for storm water
management 
6. School conservation projects
7. Community led nature projects 
5. DIRECT AND COMPETITIVE GRANTS 
DIRECT GRANTS – DELEGATION OF AUTHORITY 
5.1 At the meeting of this Committee on 6 September 2022, concerns were raised
by councillors that the 2021-22 monies were not fully spent (para 13 of the
draft minute refers).  This is a sentiment shared by council officers involved,
and it is felt that these monies are an extremely valuable resource to the
council. 
5.2  Significant challenges have emerged over both years of the fund so far, with
limited capacity within services to plan and deliver meaningful biodiversity
enhancement within the short cycle between receipt of the funds and the
spending deadline at year end. Grant amounts are uncertain year on year,
and the requirement for committee approval following announcement of the
council’s allocation in early summer has therefore limited projects to activities
suitable only to late autumn and winter work and are also subject to the
availability of external contractors, given limited in-house capacity. 
5.3  Granting delegated authority to the Head of Economic Growth and
Development would enable quick and responsive delivery of the funds as
soon as the grant is received, reducing the risk of returning any funds to the
Scottish Government. This will also allow planned projects to proceed during
the summer months, broadening the scope of possible direct actions and
increasing their effectiveness. 
5.4  There are indications that the remaining three years up to 2025/26 will see a
reduced direct grant allocation as the Scottish Government encourage local
authorities to work with partners on larger, landscape scale, projects to bid for
grants competitively. 
COMPETITIVE GRANTS 
5.5  The competitive strands of the fund include two competitive rounds each year,
accepting applications for grants of £25k to £250k, and £250k+ via
NatureScot. The requirement this year (and expected in future years) is that
Page 369

Page 370

local authorities cannot bid for these independently and must work with
partners on landscape scale projects. 
5.6  It is accepted that existing staff capacity to deliver additional projects is
limited.  Nevertheless, the costs of inaction on nature recovery are likely to
include catastrophic impact on biodiversity, food systems, economy, health
and wellbeing, as well as climate change. Taking decisive action now will
minimise future costs and should therefore be a priority.  Upon weighing these
considerations, it is therefore proposed that any potential competitive bids
would be sought with partner organisations willing to take a lead role, and
would be subject to existing available staff resource. This could involve
working with organisations such as neighbouring local authorities, the Scottish
Invasive Species Initiative or the North East Scotland Biodiversity Partnership.
Such partnership based applications would be subject to committee approval
in line with normal practice 
5.7  Members should note that staff in Strategic Planning and Development and
the Economic Growth and Regeneration teams are already delivering on
major projects which provide cross cutting impacts relating to the economy,
climate, community, place making and biodiversity. These funds include the
Moray Growth Deal, the Just Transition Fund, Place Based Investment Fund,
Heritage and Place Programme and Rural Tourism Infrastructure Fund and
this currently represents in the region of £125m investment in Moray. As
referenced in a report to full Council on 29 June 2022 (para 16 of the minute
refers), there is still potential through further bidding rounds and new funding
opportunities to attract significant further investment in Moray that could match
or exceed the existing investments but only if we provide the staffing capacity
to continue to develop the strategies, plans and business cases that support
funding bids. Potential future funding includes Just Transition Fund, Capital
Regeneration Fund, UK Shared Prosperity Fund, Vacant and Derelict Land
Fund, Energy and Climate Change related funds. 
5.8 With the volume of work associated with the existing funding streams and
projects these teams have little if any capacity for the development of further
bids beyond what has recently been achieved or is in progress. In light of this,
should the funding streams set out at 5.7 be prioritised, there may be
insufficient capacity remaining within existing staffing resources to enable
applications for competitive grants to be pursued. Council is asked to approve
this application of a priority based approach, following on from the report to
Council in June referenced above. 
5.9 The approach outlined in para 5.6 is a pragmatic one which recognises that
biodiversity needs positive action to mitigate the challenges faced, provides a
limited approach to Council involvement in that action and utilises funding
readily available without necessarily seeking to maximise the funding to
enhance biodiversity due to the limited available staffing resource we now
have across the teams involved.  Should capacity and identification of an
external lead agency suggest a competitive bid can be resourced as set out
above, a report would be submitted to council for consideration. 
Page 370

Page 371

6. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Enhancing local biodiversity delivers a wide range of social and
environmental benefits that will support the corporate and community
planning objectives. 
(b) Policy and Legal
The Nature Conservation (Scotland) Act 2004 places a duty on public
bodies in Scotland to further the conservation of biodiversity when
carrying out their duties. 
Efficient delivery of the Nature Restoration Fund will contribute to the
Council meeting its biodiversity duty and align with the Council’s Climate
Change Strategy aim to ‘Work to retain, protect and enhance biodiversity
across Moray’. 
(c) Financial implications
There are no additional costs arising from this report. The proposal is
intended to enable more efficient and thorough use of available external
grant funding using existing staffing resources and minimise loss of the
same, underpinned by a prioritised approach to competitive bids. 
(d) Risk Implications
If delegation of decision making is not agreed, there is a real risk that the
full benefits of this funding are not realised, due to the limited timescales
involved. 
(e) Staffing Implications
Delivery of the grant will continue to place pressure on officers from
Strategic Planning and Development who manage the received grant
funding and lead on several of the projects within available capacity and
workloads, working with officers from Environmental Protection and other
departments and agencies where relevant and on a prioritised basis. 
(f) Property
Proposals are considered to enhance land owned and/or managed by
the Council, and within the Moray area. 
(g) Equalities/Socio Economic Impact
By increasing biodiversity, projects should also contribute to community
health and wellbeing and reduce inequalities of access to nature.  The
impact of this challenge is outlined in para 5.9. 
(h) Climate Change and Biodiversity Impacts
All proposals will chiefly and directly support mitigation of, and
adaptation to, the climate and biodiversity crisis. 
(i) Consultations
The Depute Chief Executive (Economy, Environment and Finance), the
Head of Economic Growth and Development, the Legal Services
Page 371

Page 372

Manager, the Open Space Manager, the Principal Accountant, Tracey
Sutherland (Committee Services Officer) and Equal Opportunities Officer
have been consulted and comments received have been incorporated
into the report. 
7. CONCLUSION 
7.1 The Scottish Government’s Nature Restoration Fund is currently in year
two of a five year commitment, running to 2025/26 and is considered a
valuable resource to the council, enabling biodiversity enhancements
that would otherwise have been limited, or not taken place. 
7.2 Effective delivery of the fund has been challenging as a result of timing
of grant delivery, committee cycle and seasonal nature of certain
actions. 
7.3 The Committee are asked to delegate authority to the Head of Economic
Growth and Development to spend the direct grant allocation within the
identified areas, for the remaining three years of the fund. Annual
progress reports will be delivered to this Committee and to support the
prioritised approach to competitive bids proposed. 
Author of Report: Sophie Ward, Climate Change Strategy Officer and
Emma Gordon, Planning Officer 
Background Papers: 
Ref: SPMAN-813460984-314 
Page 372

Page 373

REPORT TO:   ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES
COMMITTEE ON 15 NOVEMBER 2022 
SUBJECT:  ANNUAL REPORT ON ENERGY STRATEGY/ACTIONS 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1 REASON FOR REPORT 
1.1 This report sets out the annual energy and water performance of the Council’s non-
domestic building portfolio in 2021/22.
1.2 This report is submitted to Committee in terms of Section III (F) (33) of the Council's
Scheme of Administration relating to the monitoring of the Council’s Economic
Development and Infrastructure Services. 
2 RECOMMENDATION 
2.1 It is recommended that Committee:- 
(i) considers and notes the Annual Energy Report for 2021/22 set out in the
report; 
(ii) notes that in 2021/22 the Council’s energy consumption in non-
domestic operational properties increased by 14.2%, and the energy
bill increased by 19.7% (£543,809); 
(iii) approves the revisions made to the council’s Heating Policy at Appendix
2 of a 1oC reduction in the temperature set point from 200C to 190C and
to take account of revised ventilation requirements; and 
(iv) approves the interim update of Energy Policy at Appendix 1 to align with
the mandatory targets set by the Scottish Government and agrees that
officers review the Energy Policy and Strategy in order to align its goals
with the Route Map to Net Zero and the Local Heat and Energy Efficiency
Strategy (LHEES). 
Item 10
Page 373

Page 374

3 BACKGROUND 
3.1 Annual reports have been presented to Committee since 2006; the last report was
submitted for noting to the Economic Development and Infrastructure Services
Committee on 19 October 2021 (paragraph 9 of the minute refers).  This report is
submitted as the Council’s Annual Energy Report for 2021/22. 
3.2 Improving energy efficiency not only minimises costs, but also reduces on-going
carbon emissions in the most cost-effective manner. 
3.3 During the financial year 2021/22 Moray Council’s expenditure on utilities (including
street lighting) was approximately £3.7M, with associated carbon emissions of
10,022 tonnes CO2. 
4 PERFORMANCE 
Consumption and Costs 
4.1 Table 1 provides a summary of the Council’s utilities consumption, costs and
emissions during 2021/22. Heat refers to kWh from Biomass plant. 
Table 1 
4.2 The operation of the Council’s non-domestic buildings cost £3,303,763.00 with
further expenditure of £392,373 on street lighting and unmetered electricity. 
Combined Energy Consumption
4.3 Table 2 below provides a comparison of energy consumption between 2020/21 and
2021/22 for individual utilities. 
Table 2 
Utility 20-21 21-22 Difference  %
Heat (Biomass) 2,258,199 2,324,492 66,293 3%
Oil  2,921,881 3,336,476 414,595 14%
Gas  23,469,901 25,784,297 2,314,396 10%
Electricity  8,837,942 11,360,814 2,522,872 28.5%
Overall Building Total (kWh) 37,487,923 42,806,079 5,318,156 14.2%
Street Lighting & Unmetered Elec  2,439,372 2,343,106 -96,266 -4%
Overall Total (kWh) 39,927,295 45,149,185 5,221,890 13.1%
Water (m3) 103,558 106,151 2,593 2.5%
Commodity
Consumption
(kWh/m3)
Net Cost
(£)
Carbon
(tonnes CO2)
Heat 2,324,492 £120,070 35                   
Oil 3,336,476 £195,372 923                 
Gas 25,784,297 £688,094 4,743              
Electricity 11,360,814 £1,816,774 3,490              
Street Lighting & Unmetered Elec 2,343,106 £392,373 720                 
Water (m3) 106,151 £483,453 112                 
Totals £3,696,136 10,022           
Annual Report Figures 21-22
Page 374

Page 375

4.4 The combined energy consumption from the Council’s buildings, for 2021/22 was
42,806,079 kWh compared with consumption of 37,487,923 kWh for 2020/21,
equivalent to a 14.2% increase. 
4.5 The graph below shows the Council’s total energy consumption in its non-domestic
buildings against a 2008/09 baseline, compared to the 2% energy consumption
reduction target and predicted increases, (based upon Government forecasts of a
Business-as-Usual uplift of 0.7% per annum). 
4.6 Heating-related Energy Consumption
To take account of weather conditions a measure termed “Degree Days” is utilised
to incorporate the effect of warmer or colder conditions – permitting a comparison of
heating related efficiency. 
4.7 The graph below shows the Council’s weather adjusted heating consumption for the
last 11 years. 
35,000,000
37,000,000
39,000,000
41,000,000
43,000,000
45,000,000
47,000,000
49,000,000
51,000,000
53,000,000
55,000,000
ANNUAL ENERGY CONSUMPTION (KWH)
TOTAL ACTUAL BUILDING ENERGY CONSUMPTION V
PREDICTED & 2% ENERGY REDUCTION TARGET
Total Energy Consumption (KWh) Predicted (BAU) Energy Consumption (KWh)
2% Per Annum Energy Reduction Target
Page 375

Page 376

4.8 Heating accounts for a significant proportion of the Council’s energy consumption. 
The weather in 2021/22 was 3% warmer than in 2020/21 and the graph above
shows a weather adjusted increase in heating consumption of 14% compared to
2020/21. This can be attributed to effect of lockdowns closing buildings, particularly
schools in 2020/21.  Followed by the re-opening of buildings in 2021/22 with
increased ventilation requirements.   
4.9 Table 3 summarises the absolute and relative variations in gas consumption for the
various property groupings within the Council’s property estate. 
Table 3 
Property Grouping 2020/21 KWh 2021/22 KWh Difference
%
Difference
Community Centres 458,468 469,547 11,079 2.42%
Day Centres 1,034,925 1,037,708 2,783 0.27%
Depots  400,445 415,624 15,179 3.79%
Halls 119,607 162,760 43,153 36.08%
Hostels 2,904 2,576 -329 -11.32%
Industrial Premises 214,339 177,035 -37,304 -17.40%
Libraries  560,627 704,831 144,204 25.72%
Minor Sites 11,669 12,678 1,009 8.65%
Museums/Visitor
Centres  83,512 80,006 -3,506 -4.20%
Lady Cathcart Nursery 160,653 181,069 20,416 12.71%
Offices Total 1,503,622 1,524,765 21,142 1.41%
Primary Schools  7,368,873 7,874,244 505,371 6.86%
Residential Homes  915,681 962,611 46,930 5.13%
Secondary Schools  7,331,978 8,789,972 1,457,994 19.89%
Sports Facilities 5,368 5,123 -245 -4.56%
Buckie Swimming
Pool* 996,506 1,263,572 267,067 26.80%
Page 376

Page 377

*other pools are within schools 
4.10 Main points to note in relation to the above table are as follows:- 
• The increased consumption can be attributed to buildings reopening post
pandemic with enhanced ventilation.
• Schools account for the largest increases in consumption. Lossiemouth High
School is omitted from the above figures, as there was incomplete data for
the year 2020/21.  Milnes High School was omitted as gas is used only as a
backup to the Biomass.  With these removed the percentage uplift is more
representative of the impact that the increased ventilation requirements.   
4.11 The impact of Covid 19 on the operation of Council properties continues to affect
the energy performance, with the changes in how buildings are occupied and
ventilated.  This has meant comparisons to typical historic performance are less
meaningful.  As resources allow, officers continue to investigate properties with
largest increases of consumption and mitigation measures to the deal with the need
for enhanced ventilation.   
Water Consumption
4.12 The Council’s water consumption for 2021/22 was 106,151m3 compared with
consumption of 103,558 m3 for 2020/21, an increase of 2,593 m3, equivalent to a
2.5% increase. A post pandemic return to buildings, especially schools has caused
this increase. 
Street Lighting
4.13 The management and maintenance of street lighting is undertaken by Direct
Services.  The associated energy consumption in 2021/22 was 2,343,106 kWh, 4%
lower than the 2020/21 consumption of 2,439,372 kWh.  It is expected that the LED
replacement programme will be fully completed during 21/22. There are
approximately 600 lanterns outstanding with 17,182 changed to date. Electricity
consumption has dropped by 67% compared to that being used prior to the
project’s inception. 
Carbon
4.14 Carbon dioxide emissions provides a single common denominator between
disparate activities such as electricity, transport and waste recycling.  Table 4
details the carbon emissions associated with energy and water consumptions
attributable to Moray Council building related operations (figures are in tonnes of
CO2). 
Table 4 
Utility 20-21 21-22 Difference  %
Heat 34 35  1  3%
Oil 808  895 87  11%
Gas  4,318  4,723  405  9%
Electricity  2,715 2,626  -89  -3%
Street Lighting & Unmetered Elec  749  542  -208  -28%
Water 109  112  3  3%
Overall Total C02e 8,733  8,931  198  2%
Page 377

Page 378

4.15 Carbon emissions from the Council’s non-domestic buildings and street lighting in
2021/22 were 2% higher than in in 2020/21.  Contributory factors which would have
affected the above performance include: 
• Changes in building operations due to Covid 19 with an associated
significant increase in energy use to heat buildings.
• More street lighting provided from LED technology reduced carbon
emissions.
• A reduction in the UK Government carbon conversion factor for electricity
makes the increase of carbon emissions less than the increase in the
Council’s consumption. 
5 UTILITY MANAGEMENT 
Utility Expenditure
5.1 In 2021/22 the Council’s total utility bill amounted to £3,696,136 an increase of
£543,809 (17%) compared to 2020/21 - with buildings constituting the largest
element at £3,303,763.  The cost of street lighting continued to fall as a result of
LED replacements. Table 5 below gives a breakdown of costs. 
Table 5 
5.2 Scottish Procurement 
The Scottish Government have a national framework in place with Total Energies
Gas & Power for the supply of natural gas, EDF Energy Customers Ltd for
electricity and Business Stream Ltd for water.  These frameworks have been in
place since 2018, 2019 and 2020 respectively, and are used by 98% of Scottish
public sector organisations. 
5.3 Scottish Procurement (SP) have a Risk Management Committee (RMC) who
oversee policy, procedures and the purchasing strategy. Gas and electricity is
purchased up to 2.5 years in advance, this has provided a high level of protection
by purchasing over a long period of time.  SP give the council a fixed wholesale
price of gas and electricity for the fiscal year.  Therefore the impact of the high cost
of energy on the council has been partially mitigated.  SP’s due diligence means
that there are no security of supply concerns for Natural Gas or Electricity.  Our
suppliers are stable and not exposed to the financial pressures which have seen
smaller energy firms collapse. 
Net Cost 
Utility 20-21 21-22 Difference  %
Heat £111,777 £120,070 £8,293 7%
Oil  £114,841 £195,372 £80,531 70%
Gas  £640,192 £688,094 £47,902 7%
Electricity  £1,416,174 £1,816,774 £400,600 28%
Water £476,970 £483,453 £6,483 1%
Overall Total - Buildings Only (£) £2,759,954 £3,303,763 £543,809 19.7%
Street Lighting & Unmetered Elec  £399,085 £392,373 -£6,712 -1.7%
Overall Total (£) £3,159,039 £3,696,136 £537,097 17.0%
Page 378

Page 379

5.4 The wholesale cost of gas and electricity for Moray Council was fixed for the
fiscal year 2022/23 in March 2022.  Gas was set at 5.2618/kWh and Electricity
at 8.043 p/kWh. This does not include the non-energy charges that are included in
the invoices the Council pays.  As a guide to the savings made by the trading
strategy overseen by the RMC - a customer looking to secure a fixed price from
April 2022 for 12 months would have been quoted circa 11p/kWh for gas and
33p/kWh for electricity. 
Inflation
5.5 With inflation forecast to rise to as high as 10% this year a number of non-energy
costs will be impacted.  The tariffs that we pay as part of electricity invoices that are
indexed to inflation are; charges that pay for renewable subsidies, the capacity
market that balances the grid, and for use of the distribution and transmission
network. This increase will particularly be seen from April 2023. 
5.6 Despite the protection offered by SP to the council there has been a substantial rise
in energy price, when compared to previous years.  Gas and electricity standing
charges vary across the Council’s sites depending on the size and type of the
supply.  Electricity consumption charges also vary depending on the site and what
time of day the electricity is used.  One way to quantify the price is to calculate a
pence per unit (PPU) cost. 
Future Budget Guidance
5.7 Projections have been made to estimate the financial outturn to year end 2022/23.     
Table 6 
21-22 22-23 Increase %
Electricity (Total) £2,209,147 £2,643,778 £434,631 20%
Gas £688,094 £1,783,450 £1,095,356 159%
Biomass & Oil £315,442 £447,234 £131,792 42%
Overall Total £3,212,683 £4,874,462 £1,661,779 52%  
5.8 The above figures are based on Sigma Accruals reports that apply this year’s price
rates to last year’s consumption figures.  The actual outturn may vary greatly as
4.74 4.83 4.85 4.95 5.17
8.88
4.74 5.31 4.85 3.93 5.86
8.54
2.40 2.84 3.05 2.73 2.67
7.62
13.22 13.70 14.77 16.02 15.99
19.35 
-
5.00
10.00
15.00
20.00
25.00
Av PPU 17-18 Av PPU 18-19 Av PPU 19-20 Av PPU 20-21 Av PPU 21-22 Av PPU 22-23
PENCE PER KWH
FISCAL YEAR
AVERAGE ENERGY COST PER UNIT
(KWH)
THE MORAY COUNCIL
Heat Oil Gas Electricity
Page 379

Page 380

consumption changes according to building use, weather conditions and non-
energy costs are applied to invoices. 
5.9 Scottish Procurement periodic updates on price forecasts for the electricity and gas
contracts. The most recent, Contract notice #52 was released in July 2022.  It
predicts the cost increase set out below.   
Table 7  
2023-24 2024-25
Variance to 22-23 Gas +8% +18%
Electricity + 53% +79% 
5.10 Biomass Contract – The previous contract with AMP Clean Energy covered the 4-
year period 1 September 2017 to 31 August 2021 and the option to extend had
been exercised with a termination date of 31 August 2022. A procurement exercise
was carried out throughout July and August 2022.  AMP Clean Energy were again
the successful bidder. The Call-Off Contract will cover the period from 01/09/2022
to 31/10/2025 with the option to extend for 2 further periods of 12 months. (Subject
to an annual review at the financial year end in April, incorporating price
negotiations and KPI performance.) 
Renewable Energy Generation Revenue
5.11  The council currently operates 2 biomass heating systems, at Speyside and Milne’s
High Schools and a solar thermal system at Forres Swimming Pool. 
5.12  For the 2021/22 period the Council received combined Renewable Heat 
Incentive (RHI) payments of £102,513. 
Table 8 
Total RHI Income  20-21 21-22 Difference  %
Milnes HS £52,999 £52,127 -£872 -2%
Speyside HS  £56,990 £49,473 -£7,517 -13%
Forres Pool £1,995 £912 -£1,082 -54%
Total RHI Income £111,983 £102,512 -£9,471 -8% 
5.13 The reduction in payments for Forres Pool relate to a malfunction in the system,
then delays in repair due to supply chain issues in getting a replacement pump. 
This has now been rectified. 
5.14 The council operates a single site which benefits from the Feed In Tariff (FIT)
scheme. This is the Solar PV array on Elgin High School. 
Total FIT Income 20-21 21-22 Difference %
Elgin HS  £1,739 £1,938 £199 11% 
Invoice Processing
5.15 All utility invoices go directly to the Energy Team for verification and validation prior
to centralised authorisation and payment.  The vast majority of utility invoices are
received electronically and uploaded directly onto the Council’s monitoring and
targeting system – TEAM Sigma.  The software automatically performs validation
checks on the data received, highlighting any abnormalities for the Energy Team to
investigate.
Page 380

Page 381

5.16 During 2021-22 the active management, checking and validation of utility
consumptions and invoices identified over £66,300 of erroneous charges which
were resolved by the Energy Team.
6 POLICY AND STRATEGY 
Scottish Government
6.1 In December 2020 the Scottish Government issued an update to the 2018 Climate
Change Plan.  The update committed to reducing emissions by 75% by 2030
(compared with 1990) and to net zero by 2045.   
6.2 In October 2021 the Scottish Government published The Heat in Buildings
Strategy. This sets a requirement for all local authorities to produce a Local Heat
and Energy Efficiency Strategy (LHEES) by the end of 2023. At time of writing the
Council is recruiting a LHEES officer to assist in producing this strategy. 
Moray Council Energy Policy and Strategy
6.3 On 10 March 2021 (paragraph 13 of minute refers) the council adopted the Climate
Change Strategy which set a goal of the Council being carbon neutral by 2030.  On
6 April 2022 (paragraph 18 of minute refers), the Council approved the Route Map
to Net Zero.  This creates a framework for our actions aimed at reducing carbon
emissions to net zero by 2030. 
6.4 The Council’s Energy Policy and Strategy (EPS) was first produced in 2005 and
subsequent revisions have been agreed by this Committee and made available
publicly via the Council’s Energy Internet website. 
6.5 The EPS is now out-dated and has been updated to reflect the policy changes in
the Scottish Government’s policy. Appendix I contains an interim update to the
EPS.  It is recommended that Committee approves the updated strategy.   
6.6 It is also recommended that committee agrees that officers work to further update
the EPS in order to align its goals, strategy and delivery plan with the Route Map to
net Zero and the LHEES. It would be intended to report to Committee next year to
consider the proposals for a further revised EPS. This work will not be to the
detriment of the on-going monitoring and managing the council’s energy
consumption.  Alongside energy efficiency measures that reduce consumption
which can be actioned in the short term.   
Heating Policy
6.7 On 19 October 2021, this Committee agreed that officers review the Council’s
Heating Policy, with a view to reporting a revised Heating Policy in 2022 (paragraph
9 of the minute refers). The greatest savings to be made are by reducing the
temperature set point. Therefore the heating policy (Appendix II) has been
amended changing the temperature set point from 20oC to 19oC. By reducing the
set point from 20oC to 19oC there are potential savings to be made of in the region
of £200,000 across the Council’s non-domestic building stock, based on 2021/22
consumption and the 2022/23 unit rate for gas. Wording has also been updated to
reflect current ventilation requirements. The revised policy is produced as
Appendix 2. 
Page 381

Page 382

7. ENERGY INITIATIVES 
Energy Projects
7.1 In 2021/22 there was no spend on minor Energy Efficiency Projects.  There is
£15,000 for minor energy efficiency projects in 2022/23.  The energy team are
currently working with maintenance to identify LED lighting replacement projects
that will be implemented over the coming months. All of these projects will have a
payback period of less than two years. 
7.2 There was £193,000 spent on LED lighting projects, replacing older inefficient
lighting with LED. These have been funded as spend-to-save projects. 
Future Energy Initiatives
7.3 To achieve the target within the Climate Change Strategy of net zero carbon
emissions by 2030 it is essential to incorporate energy efficiency/carbon
management as a prime consideration into all on-going work. This should be done
in conjunction with the rationalisation of the council’s offices, depots and stores as
well as the delivery strategy that will be set out in the LHEES. 
7.4 The energy team continue to work with the Maintenance and climate change teams
to identify and implement minor capital energy efficiency projects. Projects currently
implemented or in planning with a view to being completed in the short term
include; engagement with schools during climate week to raise awareness of
behaviours on energy usage, engagement with all staff however initially focused on
office based staff to raise awareness of personal actions on our energy usage, LED
light replacements and Solar PV installations, medium term projects including
assessment and evaluation of heating systems with option to install heat pumps or
bio mass boilers as appropriate. Long term projects may include heat networks,
community energy generation and alternative fuel sources. 
7.5 Moray Council has recently received a letter from the Scottish Government
regarding the Scottish Procurement Framework encouraging all users to reduce
energy consumption to “create some headroom for new organisations such as
Charities and GP practices to join the framework”. Within this letter a number of
capital projects are suggested all of which are currently under consideration or
action by the Council. 
8. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan)
(LOIP)
The Energy Policy and Strategy along with actions to minimise the Council’s
energy use support the aim of the Corporate Plan of a financially stable
Council. 
The Council’s Corporate Plan 2019 – 2024 identifies the environment as a key
principle in the delivery of the Council’s priorities. 
“Environment – look after the world we live in to protect it for the future” 
and for Moray Council to be 
Page 382

Page 383

“A resource efficient, carbon neutral council that works with partners to
mitigate the worst effects of Climate Change, to create a resilient, fair and
more sustainable future for everyone within Moray”. 
On 10 March 2021 (paragraph 13 of minute refers) the council adopted the
Climate Change Strategy, the strategy set a goal of the Council being carbon
neutral by 2030.  On 6 April 2022 (paragraph 18 of minute refers), the Route
Map to Net Zero was approved.  This creates a framework for our actions
aimed at reducing carbon emissions to net zero by 2030. 
(b) Policy and Legal
In October 2021 the Scottish Government published The Heat in Buildings
Strategy. This sets a requirement for all local authorities to produce a Local
Heat and Energy Efficiency Strategy (LHEES) by the end of 2023. 
(c) Financial Implications
In 2021/22 the Council’s total utility bill amounted to £3,696,136, an increase
of £543,809 (17%) compared to 2020/21. 
Unit electricity costs have increased by 20% and gas costs have increased by
157% from 2021/22 to 2022/23. With 2022/23 actual spend to end of August
and current cost is applied to energy consumption of 2021/22, the projected
annual costs of electricity and gas in 2022/23 will be £2,643,778 and
£1,783,450 and respectively. 
During 2021-2 the active management, checking and validation of utility
consumptions and invoices identified over £66,300 of erroneous charges. 
£15,000 has been allocated for energy efficiency projects in the Council’s
2022/23 capital plan, officers will also continue to take forward spend to save
proposals. 
(d) Risk Implications
Budget guidance issued in June 2021 by Scottish Procurement indicates that
in 2023-24 electricity unit costs are forecast to increase by 53% and gas unit
costs by 8%, whilst in 2024-25 electricity will increase by 79% and gas by 79%
- compared to 2022-23.  However, energy markets remain volatile, there is a
significant risk that future prices may change dramatically. 
(e) Staffing Implications
The workload associated with transforming the Council’s property portfolio to
net zero carbon is expected to increase year on year. 
(f) Property
The property implications are as set out in this report. 
(g) Equalities
There are no equalities implications. 
(h) Climate Change and Biodiversity Impacts
Updating the EPS to reflect the Councils goals to achieve net zero and the
developing LHEES strategy will assist in setting out strategic cohesion in
achieving reductions in climate emissions. 
Page 383

Page 384

(i) Consultations
The Head of Housing and Property, the Chief Financial Officer, the Head of
Economic Growth and Development Services, the Design and& Construction
Manager, the Principal Climate Change Officer the Legal Services Manager,
the Equal Opportunities Officer and Lissa Rowan, Committee Services Officer
have been consulted and any comments incorporated in this report as
appropriate. 
9. CONCLUSION 
9.1 The Council’s utility consumptions rose by 14.2% and utility costs rose by
17% in 2021/22.  . It should be noted that this increase can be attributed to an
increase in the use of our buildings along with a requirement for increased
ventilation. Primarily the reoccupation of schools following the relaxation of
Covid 19 restrictions. 
9.2 There is still potential for reductions in energy consumption through a
programme of energy projects, Energy Management Systems and staff
awareness/behaviour changes in the short term as outline within this report.  . 
These are necessary to minimise the Council’s carbon emissions and energy
costs. The energy team continue to progress these actions to reduce
consumption and costs. 
9.3  The rationalisation of the council’s corporate building stock and the way in
which we use buildings post pandemic continues to evolve.  The long term
energy reduction strategy needs to align its goals and actions with this
rationalisation and the council’s Route Map to Net Zero. 
Author of Report:  Iain Highet, Energy Officer
Background Papers:  As referred to in this report.
Ref:    SPMAN-1285234812-1183 
Page 384

Page 385

APPENDIX I 
THE MORAY COUNCIL 
ENERGY POLICY AND STRATEGY – NON DOMESTIC OPERATIONAL
PROPERTIES 
Energy Policy – Statement of Commitment 
The use of energy is vital in our operation and the provision of services to our
community.  The importance of controlling our energy consumption and associated
carbon dioxide emissions has never been so high. 
The Scottish Government updated the 2018 Climate Change Plan in December 2020. 
This set out a new ambitious target to end Scotland’s contribution to climate change
by 2045.  Making a commitment to reduce emissions by 75% by 2030 (compared with
1990) and to net zero by 2045. On 10 March 2021 (paragraph 13 of minute refers) the
Council adopted a Climate Change Strategy for 2020-2030.  The strategy set a goal
of the Council being carbon neutral by 2030 and that the Council, its officers and
members will work with others across Moray to deliver that goal. 
As a signatory to the Scottish Climate Change Declaration the Council has
demonstrated its commitment to playing its part in mitigating the effects of climate
change.  To achieve this the Council will ensure that:- 
• Energy management is fully integrated across all relevant decision making to
reduce energy consumption, costs and carbon emissions in all buildings it
occupies or operates.
• Sufficient resources are in place to meet the objectives of the policy.
• Energy awareness of all staff is raised and maintained within the Council.
• A Heating Policy document is used to provide guidance on the use of heating
systems.
• This policy and strategy document is made public and that progress against its
objectives is reported to Policy and Resources Committee on an annual basis. 
Aims 
• Reduce the Council’s energy consumption by 2% per annum on a year to year
basis.
• Ensure that the Council’s position in respect of the Carbon Reduction
Commitment Energy Efficiency Scheme is optimised. 
Energy Strategy 
Key to achieving our policy aims is to develop an Energy Strategy setting out how the
policy objectives will be met. 
This strategy applies to all energy use within buildings occupied or operated by the
Council.  The specific aims of the strategy are:- 
Item 10
Page 385

Page 386

1. To record energy and carbon consumption by using monitoring and targeting
processes.
• Energy consumption in Council buildings is monitored and the information
recorded on a suitable database and reported back to the Site Responsible
Person.
• Consumption in buildings is analysed against benchmarks to identify those
buildings with the best opportunities for savings.
• Energy audits will be targeted at inefficient buildings to determine what
improvements can be made.
• Energy invoices will be checked and approved by the Energy Officer for
accuracy.
• Review procedures for processing and checking energy invoices.  
• Ensure that high quality energy consumption data is collated to comply with
Carbon Reduction Commitment Energy Efficiency Scheme requirements. 
2. To increase awareness of energy efficiency measures.
• Improve Site Responsible Persons’ and Council staffs’ awareness of
energy issues.
• Provide training via internal and external advisers/experts to staff directly
involved in energy saving activities. 
3. Promote and develop new and innovative ways of saving energy/water.
• Include energy efficiency requirements in design briefs, planning
permissions and building warrants.
• Share information about projects with other organisations in order to spread
best practice.
• Consult an energy specialist when developing new build/refurbishment
projects. 
• Implement energy efficiency projects/measures identified from site surveys
and data analysis.
• Improve use of Building Energy Management Systems. 
• Monitor compliance with corporate Heating Policy. 
4. To reduce water consumption and costs and use water efficiently.
• Carry out site surveys to identify projects that will improve water efficiency
and produce cost savings.
• Implement water efficiency projects identified from site surveys. 
Monitoring and Review 
This policy and strategy will be reviewed annually by the Energy Officer and revisions
reported to Committee for approval. 
Page 386

Page 387

APPENDIX 2 
MORAY COUNCIL – HEATING POLICY 
PURPOSE OF HEATING POLICY: 
The Moray Council is committed to responsible Energy and Carbon Management. This
policy sets out the Council’s aims to comply with Health and Safety requirements,
providing reasonable standards of thermal comfort conditions for staff whilst minimising
emissions of greenhouse gases, particularly carbon dioxide (CO2). 
ORGANISATIONAL DEFINITION OF HEATING POLICY: 
The policy for The Moray Council is to set and control the temperature ranges in the
heating season, approximately October 13th to 31st May. By adopting and implementing
these measures the need to manage our Carbon Footprint, conserve environmental
resources and reduce expenditure will be addressed. 
THE SCOPE OF THE POLICY 
During core occupancy times in the heating season:  
• the temperature set point will be 19°C. 
• heating will apply between the hours of 0800 and 1800 Monday to Friday.
• buildings are required to be at their operating temperature within one hour of
occupancy.
• Outside of core occupation times, all buildings default to a temperature setting of
10 to 12°C to maintain the fabric of the building and to protect water pipes. 
Exceptions will apply to swimming pools, sports facilities, school buildings and nurseries
with young children, buildings with vulnerable and elderly occupants and buildings which
operate outside normal office hours. Depots and buildings where manual labour is
performed will have their heating set to16°C. 
Heating time schedules to be agreed with the principal users of buildings and represent
the best possible balance between the need to provide comfortable working conditions
and the requirement to conserve energy and avoid waste. 
In spaces where occupants have direct control of their heating temperature it is
expected that they will set the work place thermostats in accordance with the Council’s
heating policy. 
"1°C increase causes energy consumption to rise by 9%". 
On days that are warm for the specific time of the year, heating may not be switched on
where it is judged that temperatures will rise quickly to target levels during the working
day. 
The heating for the building: 
• will normally be turned off 31st May to 13th October to save energy and to allow
time for the heating system maintenance, 
• the domestic hot water system will be left on to provide hot water at sinks and for
Legionella control. 
Item 10
Page 387

Page 388

APPENDIX 2 
Unseasonal weather conditions may determine changes to these dates. The actual
times and dates of daily heating operations can be altered on the authority of the Site
Responsible Person to meet local conditions and situations. 
• As electrical heating generates at least twice the CO2 emissions of gas heating:
individual heating systems may not be brought in from home 
• and are prohibited for safety reasons. 
Supplemental electric heaters, which are Portable Appliance Tested annually and held
by the Maintenance Section of Housing & Property Department, may be authorised by
the Site Responsible Person in special agreed circumstances by contacting the
Maintenance Helpdesk. 
In particular circumstances, where an individual for health reasons may need special
consideration then their Line Manager should refer to the Occupational Health Service
for advice. 
RESPONSIBILITIES FOR DELIVERY 
Responsibilities 
Responsibility for formulating and implementing the Heating Policy lies with the Property
Asset Manager. 
Responsibility for extending or shortening the heating season in view of weather
conditions lies with the Energy Officer. 
Responsibility for reducing/exceeding localised set temperatures in temporary
unseasonal weather conditions lies with the Site Responsible Person. 
Responsibility for setting/altering set times to meet localised situations lies with the Site
Responsible Person. The Energy Officer and Building Services Engineer should be
consulted, via the Property Asset Manager, prior to any major alteration to the system
settings. 
Responsibility for investigating complaints lies with the Housing & Property Department.
Depending on the nature of the complaint, the appropriate manager will respond
accordingly and provide suitable feedback. 
Responsibilities of all staff 
All staff are responsible for keeping heat in the building by closing windows and doors as
appropriate and to ensure that radiators are not blocked with furniture, clothing etc. This
is the default position however while guidance from Scottish Government remains
encouraging increased ventilation staff are expected to act responsibly and use
appropriate judgement in managing the need for appropriate ventilation verses
increased heating requirements taking account of each buildings specific circumstances.   
Page 388

Page 389

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 15 NOVEMBER 2022 
SUBJECT: ECONOMIC DEVELOPMENT ANNUAL REVIEW 2021/22 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To present to committee the Economic Development Annual Review for
2021/22. The purpose of the report, the sixth such iteration, is to provide an
overview of the primary economic development activity in Moray in which
Moray Council has either been a lead or key partner. The full Economic
Development Annual Review 2021/22 has been included as Appendix 1. 
1.2 This report is submitted to Committee in terms of Section III (F) (2) of the
Council's Scheme of Administration relating to the exercise of functions that
promote economic development. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee approve the publication of the
Economic Development annual Review for 2021/22 
3. BACKGROUND 
3.1 The Economic Development Annual Review was last reported to committee
on 21 January 2020 for the 2018/19 financial year (paragraph 9 of the minute
refers). This was the last such report prior to the COVID pandemic. 
3.2 At its meeting on 25 August 2015 (paragraph 9 of the minute refers), the
Council agreed broad headings for the Economic Development Annual
Review. These were selected to bring together the broad span of economic
development activities undertaken across the Council which are reported
across a range of committees. 
3.3 This report, covering the 2021-22 financial year, is the 6th annual report and
covers the period which commenced during the second national lockdown. As
a result, the data included must be viewed within the context of the latest in a
Item 11
Page 389

Page 390

series of significant events which have had a major impact upon economic
performance in Scotland, including the challenges arising from Brexit. These
events have led to an increase in the number of people out of work, created
new challenges in exporting goods and services, and resulted in a constricted
labour market. 
3.4 To reflect some of the resultant changes to the local economic development
approach, the 2022 report has been reframed to align, in terms of format, with
the latest version of the Moray Economic Strategy (MES). These changes will
assist in providing a more strategic approach to reviewing economic
development activity in future years. 
4. MORAY ECONOMIC STRATEGY 2022-2031 
4.1 The refreshed Moray Economic Strategy (MES) 2022-2031 was agreed by
MEP at its meeting on 5 July 2022 and approved by the Moray Community
Planning Partnership Board as its meeting on 9 November 2022. The MES
2022-2031 has been uploaded to CMIS as an additional meeting document,
along with the agenda. MEP brings together Moray Council, Highlands and
Islands Enterprise (HIE), Moray Chamber of Commerce, UHI Moray, NHS
Grampian, tsiMORAY, Visit Moray Speyside, Federation of Small Businesses
(FSB), and Skills Development Scotland (SDS). 
4.2 The Vision of the Moray Economic Strategy is for Moray to be “a distinctive
and attractive place to live, work, operate a business or social enterprise,
study and visit. That will be through taking advantage of a decade of
opportunities for employment growth and higher wages, supporting a resilient
and increasingly thriving economy with communities that are strong,
sustainable and more equal.” 
4.3 The 10-year strategy is based around this vision and six strategic outcomes,
to enable Moray to take advantage of the opportunities that exist through the
transition away from carbon intensive industries, towards renewables and new
sustainable careers. These six strategic outcomes form the sections of the
Annual Review:
• Delivery of the Moray Growth Deal
• Maximising the environmental, social and economic benefits of the
transition to net zero and Community Wealth Building
• Increasing employment levels and number of companies
• A labour market that provides the required numbers of workers to take
advantage of available opportunities-notably attraction and retention of
those aged 16-29
• Ensuring alignment between skills provision and the changing
economy
• Increased productivity leading to growing wages and contributing to
closing the gender pay gap 
5. COVID BUSINESS SUPPORT 
Page 390

Page 391

5.1 Given the unprecedented scale of its impact in preserving businesses and
preventing local job losses, it is important to highlight the success of the
COVID Business Support Grants administered by Council officers, across a
range of services. 
5.2 Over the course of the Pandemic, around £43m in business support grants
was administered, with around £12m of this paid during 2021/22. Restart
grants totalling around £9.2m were issued under the Strategic Framework
Business Fund (SFBF) and Small Accommodation Providers (SAP) scheme.
The Discretionary Business, Restriction and Restart Funds allocated a total of
around £1.17m to businesses not eligible to apply for the SFBF. Further detail
is included in the Annual Review, outlining the further range of supplementary
support programmes administered. 
6. MORAY GROWTH DEAL 
6.1 Undoubtedly, the key highlight in the 2021/22 calendar was the signing of the
full Moray Growth Deal in December 2021. This confirmed the approval of the
Moray Growth Deal Programme and the associated funding by the Moray
Council, the Scottish Government and the UK Government. 
6.2 The Moray Growth Deal will support economic recovery and provide
investment of £100m over the 10 year programme period. It signals the
confidence from both the UK and Scottish governments as well as external
project partners in plans to drive innovation and growth in the region, with
projects within the Deal designed to maximise Moray’s economic
competitiveness. 
7. WELLBEING ECONOMY 
7.1 The Scottish Government’s National Strategy for Economic Transformation
(NSET) was published on 1 March 2022. It sets out a programme for action
for the next ten years, with “the vision for 2032 is for Scotland to become a
wellbeing economy, thriving in economic, social and environmental terms. The
aspiration is for Scotland's economy to outperform the previous decade, both
in terms of economic performance and tackling structural economic
inequalities.” 
7.2 In light of the Scottish Government’s commitment to developing a Wellbeing
Economy, the Improvement Service have prepared a Wellbeing Economy
briefing. This defines the key concept of a Wellbeing Economy as one which
broadens the outcomes by which economic success is measured. It states
that “a Wellbeing Economy can be viewed as an attempt to measure the
economy by looking at the quality of people’s lives.” There is a growing
recognition that a move towards actively developing Wellbeing Economies is
essential to help tackle climate change, to protect the mental and physical
health of citizens, and to tackle a range of challenges, such as growing wealth
inequalities. 
Page 391

Page 392

7.3 The Moray Economic Strategy is committed to the creation of a low carbon
economy built around increased community wealth. It is important that the
Council supports the delivery of the strategy and continues to lead on actions
relating to CWB, Climate Change and Poverty to ensure there is a
coordinated approach across significant strands of work. This will ensure
alignment between the vision of the Scottish Government’s NSET and local
economic development activity. 
8. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) 
Effective monitoring and review of economic activity supports the
corporate plan priority of promoting economic development and growth,
as well as the LOIP priority of a growing and sustainable economy.   
(b) Policy and Legal 
There are no policy and legal issues arising directly from this report. 
(c) Financial implications 
There are no financial implications arising directly from this report. 
(d) Risk Implications 
There are no risk implications arising directly from this report. 
(e) Staffing Implications 
There are no additional staffing implications arising directly from this
report. 
(f) Property 
There are no property issues arising directly from this report. 
(g) Equalities/Socio Economic Impact 
There are no equalities impacts arising directly from this report. 
(h) Climate Change and Biodiversity Impacts 
There are no biodiversity issues arising directly from this report. 
(i) Consultations 
Depute Chief Executive (Economy, Environment and Finance), the Head
of Housing and Property, the Head of Economic Growth and
Development, the Head of Environmental and Commercial Services, the
Page 392

Page 393

Chief Financial Officer, the Head of Education, the Head of Education
Resources and Communities, the Head of HR, ICT and& Organisational
Development, the Head of Governance, Strategy and Performance, the
Principal Climate Change Officer, the Equal Opportunities Officer, and
Lissa Rowan (Committee Services Officer) have been consulted and
comments received have been incorporated into the report. Officers from
a range of services across the Council have also contributed information
to inform the Annual Review. 
9. CONCLUSION 
9.1 The Economic Development Annual Review provides the Council with a
periodic overview of the Council’s role in developing a vibrant and
sustainable Moray economy. The report outlines the key economic
development activities which are either driven or supported by the
Council and provides a valuable perspective for support decision
making related to economic development. 
Author of Report: Chris Muir, Senior Officer Economic Strategy and
Development 
Background Papers: Improvement Service; Wellbeing Economy Briefing 
Moray Economic Strategy 2022-2031 
Ref:
http://spman.moray.gov.uk/MANComRepDraftSite/_layout
s/15/DocIdRedir.aspx?ID=SPMAN-813460984-309
Page 393

Page 394

Page 394

Page 395

MORAY ECONOMIC DEVELOPMENT 
ANNUAL REVIEW 
2021/22
Item 11
Page 395

Page 396

1 Introduction 
2 Strategic Landscape 
3 Delivery of the Moray Growth Deal 
4 Maximising the environmental, social and
economic benefits of the transition to net zero
and Community Wealth Building 
5 Increasing employment levels and number of
companies 
6 A labour market that provides the required
numbers of workers to take advantage of
available opportunities-notably attraction and
retention of those aged 16-29 
7 Ensuring alignment between skills provision
and the changing economy 
8 Increased productivity leading to growing
wages and contributing to closing the gender
pay gap 
9 Performance Indicators
ContentsPhoto Credits
Front Cover and page 18: Andy Innes Aerial
Photography
Page 3: Elgin BID
Page 11: Moray Wastebusters
Page 13: Billy Gregory and The Findhorn Village
Conservation Company
Page 16/17: Orbex 
This page: Speyside Way Low Carbon Hub
Front cover: Elgin Business Park  
1
4
6
8
14 
21 
24 
27 
30
Page 396

Page 397

Despite this, there has been cause for optimism
since the last annual review of 2018/19. On the 20th
December 2021 the Moray Council Leader was
joined (virtually) by ministers from Holyrood and
Westminster to complete the official signing of the
Moray Growth Deal.  This confirmed investment of
more than £100 million in Moray over the next
decade. This combined investment will see up to
£32.5 million pledged from the Scottish and UK
Governments respectively, with regional partners
including Moray Council contributing up to £35.8
million. The Moray Growth Deal programme will see
the creation of new high-quality jobs in existing
sectors and support diversification into new high-
value areas, as well as bringing forward
opportunities for future community prosperity and
addressing inequality. 
In addition to the Moray Growth Deal, there has also
been considerable investment from the private
sector in recent years. This has supported expansion
of Moray’s traditional industries in manufacturing
and distillation, alongside development of the North
Space Cluster. 
To reflect some of the changes to the economic
development approach post-pandemic, the 2022
report has been reframed to align, in terms of
format, with the latest version of the Moray
Economic Strategy (MES), approved by
the Moray Economic Partnership
(MEP) in July of this year. This will
assist in providing a more
strategic approach to
reviewing economic
development activity in
future years. 
Councillor Marc Macrae
Chair
Economic Development and
Infrastructure Services Committee
Moray Economic Development Annual Review 2021-22 1
1 Introduction
The purpose of this, the sixth Economic
Development Annual Review, is to provide an
overview of the primary economic development
activity in Moray in which Moray Council has either
led or been a key partner. The report also highlights
key economic development activity aligned with
Council priorities which is led by strategic partners
also represented on the Moray Economic
Partnership, such as tsiMORAY and Highlands and
Islands Enterprise. Effective partnership working is
key to economic development. 
This is the first such report since 2018/19, as the
focus forcibly shifted towards providing more agile
and responsive services to help stabilise the local
economy during the turbulence of the COVID-19
pandemic. This report therefore provides the first
snapshot of the economic development activity
prioritised to support the local economy recover. 
COVID-19 hit the local economy hard, exacerbating
pre-existing issues and raising new challenges. The
emergence of complex pressures such as labour
shortages, supply chain disruption and inflation
have all placed strain upon Moray businesses. 
Prior to the pandemic, Brexit was a key source of
uncertainty for the Moray economy given the
reliance of our key industries upon EU export trade.
Ongoing Brexit concerns had also created additional
labour market uncertainty. Given the time period
over which these two events occurred, it is difficult
to separate the extent to which COVID-19 and Brexit
impacted upon the economy. 
In Moray, 41.98% of employees were furloughed
through the Coronavirus Job Retention Scheme at
some point during the pandemic. This was above
the national rate of 39.33% across the whole of
Scotland and below only 5 other local authorities. To
further highlight the significance of the scheme
those employed in the public sector were only
eligible for furlough in limited circumstances. With
these jobs removed from the calculation,
significantly more than 50% of the private sector
workforce would have been furloughed.
Page 397

Page 398

COVID Business Support Grants
Over the course of the Pandemic, around £43m in
business support grants was administered, with
around £12m of this paid during 2021/22. Around
£24.5m of these funds were administered by the
Economic Growth and Regeneration Team,
supported by colleagues in other departments. April
2021 saw the lifting of restrictions with return to
business for many and Restart grants totalling
around £9.2m were issued under the Strategic
Framework Business Fund (SFBF) and Small
Accommodation Providers (SAP) scheme.  The
Discretionary Business, Restriction and Restart Funds
allocated a total of around £1.17m from April 2021
to June 2021 to businesses not eligible to apply for
the SFBF.   
As a result of local restrictions in May 2021 due to
rising cases in Moray, 646 businesses received a total
of £390k in small grants and 218 businesses received
a total of £244k for local restrictions during July. 
211 businesses received the Hospitality Business
Support Top Up, 245 the Hospitality and Leisure
Business Support Top Up and 41 Public House Table
Services Restriction funding, by way of a one-off
payment based on rateable value for those that lost
bookings during key trading periods in
December/January 2022. Payments totalled around
£1.5m. 
In January 2022, 9 businesses received a total of
£13k from the Business Ventilation Fund, helping
small and medium sized businesses (SMEs) to
improve their ventilation, with claims up to £2,500
per eligible premise to recover costs of work to
improve air quality. 
Moray Council2
£43M
administered in 
business support grants
£9.2M
Restart grants were issued
646
Moray businesses received 
£390k
in small grants
218
Moray businesses received 
£244k
in July 2021
211
Moray businesses received
Hospitality Business Support Top Up
9
Moray businesses received 
£13k
in January 2022 from 
Business Ventilation Fund
Page 398

Page 399

Moray Economic Development Annual Review 2021-22 3
Moray Economic Recovery Plan
To provide support for local business struggling as a
result of the pandemic, Moray Economic Partnership
(MEP) established an Economic Recovery Plan for
the region in the early autumn of 2020. This was
reported to the Economic Growth, Housing, and
Environmental Sustainability Committee on 6th
October of that year. The Economic Recovery Plan
delivered a local response to the crisis, based around
the principles of: 
l Smart growth
l Clean growth
l Inclusive growth
l Fair work
l Targeting disadvantage
l Smart procurement 
After establishing these principles, MEP established
a Business Resilience Forum to engage with key
sectors to obtain feedback and better understand
the local impacts on business and the main areas of
concern and support needed. The agreed approach
aimed to deliver business continuity and resilience,
ensuring that future growth was built around
equality and sustainability, while maximising the
local economic impact from public sector
expenditure.
Page 399

Page 400

Moray Council4
2 Strategic Landscape
Moray Economic Strategy 2022-2031
The Moray Economic Strategy 2022-2031, developed
by MEP, was approved in July 2022. MEP brings
together The Moray Council, Highlands and Islands
Enterprise (HIE), Moray Chamber of Commerce, UHI
Moray, NHS Grampian, tsiMORAY, Visit Moray
Speyside, Federation of Small Businesses (FSB), and
Skills Development Scotland (SDS). The refreshed
strategy reflects the strong ethos of partnership
between Moray’s key economic agencies. 
The Vision of the Moray Economic Strategy is for
Moray to be “a distinctive and attractive place to
live, work, operate a business or social enterprise,
study and visit. That will be through taking
advantage of a decade of opportunities for
employment growth and higher wages, supporting a
resilient and increasingly thriving economy with
communities that are strong, sustainable and more
equal.” 
The 10-year strategy is based around this vision and
six strategic outcomes, to enable Moray to take
advantage of the opportunities that exist through
the transition away from carbon intensive industries,
towards renewables and new sustainable careers. 
These six strategic outcomes form the sections of
this report. These are: 
l Delivery of the Moray Growth Deal
l Maximising the environmental, social and
economic benefits of the transition to net zero
and Community Wealth Building
l Increasing employment levels and number of
companies
l A labour market that provides the required
numbers of workers to take advantage of
available opportunities-notably attraction and
retention of those aged 16-29
l Ensuring alignment between skills provision and
the changing economy
l Increased productivity leading to growing wages
and contributing to closing the gender pay gap 
Corporate Plan
Currently under review, the Moray Council Corporate
Plan 2019-2024 sets a Vision for Moray to have “a life
of opportunity for all where people can thrive in
vibrant communities and we work together to enrich
our future.” It also identifies the three priorities,
which underpin all economic development activity
delivered by the Council, underpinned by a core
priority of financial sustainability, as set out below: 
l Our People: Provide opportunities for people to
be the best they can be throughout their lives
with a strong and sustained focus on those
individuals and groups in our society who
experience the most disadvantage and
discrimination
l Our Place: Empower and support communities to
build capacity
l Our Future: Drive economic
development to create a
vibrant economy for the
future 
The Moray Economic Strategy
supports delivery of the
Corporate Plan. The strategic
outcomes of the strategy are
structured around reducing
inequality and providing
increased employment
opportunities to attract and
retain the best talent in the local area. 
The commitment to building an economy around
community wealth building and the transition to net
zero will ensure increased focus is placed upon
delivery of social and environmental outcomes, as
well as economic prosperity. This is paramount to
building healthy, prosperous, and resilient
communities, ready to harness the opportunities
presented in the future economy.
Page 400

Page 401

Moray Economic Development Annual Review 2021-22 5
Local Outcome Improvement Plan
The Moray Local Outcome Improvement Plan (LOIP),
also currently under review, sets out a framework for
developing a diverse, inclusive and sustainable
economy. The aim of the plan is that, “by the year
2030 Moray will have a
sustainable and inclusive
economy which generates
improved opportunities for
everyone, including more
skilled and higher paid jobs.” 
A growing and diverse
economy will provide a stable,
sustainable employment base
for our communities, providing
opportunities for our young
people as well as tackling work-
based gender inequality. The resulting positive
outcomes experienced at an individual level will also
impact the wider community: helping young people
and women to achieve their full potential here in
Moray will ensure continued population diversity
which is as essential for the vibrancy and culture of
our local area as it is for the sustainability of our local
economy. 
The priorities of the LOIP align with the strategic
outcomes of the Moray Economic Strategy,
particularly around proving opportunity for
attracting and retaining 16-29 year olds, and
addressing inequality through growing wages and
contributing to closing the gender pay gap. 
Scotland’s National Strategy for
Economic Transformation
The Scottish Government’s National Strategy for
Economic Transformation (NSET) was published on
1st March 2022. It sets out a programme for action
for the next ten years, which includes: 
“The vision for 2032 is for Scotland to become a
wellbeing economy, thriving in economic, social and
environmental terms. The aspiration is for Scotland's
economy to outperform the previous decade, both
in terms of economic performance and tackling
structural economic inequalities.” 
NSET recognises the need for all people and
communities to share in the country’s economic
prosperity, with the ambition for Scotland to
become: 
l Fairer: reducing poverty and improving life
chances
l Wealthier: building a competitive economy
founded on entrepreneurship and innovation
l Greener: demonstrating global leadership in
delivering a just transition to a net zero 
The strategic outcomes of the Moray Economic
Strategy will assist in the delivery of the NSET
ambitions at a local level. 
Investment via the Moray Growth Deal, alongside
actions aimed at strengthening the local labour
market, growing Moray’s young and working age
populations, and ensuring better alignment
between local skills and the needs of industry, will
ensure Moray’s economy is competitive and our
population are wealthier. 
Targeting economic development towards
maximising the environmental, social and economic
benefits of the transition to net zero will ensure the
Moray economy is Greener While development of a
Community Wealth Building Strategy and Poverty
Strategy will help ensure Moray becomes a more
equal society. 
The Moray Economic Strategy is committed to the
creation of a low carbon economy built around
increased community wealth. However, there is an
opportunity to expand upon this to ensure that
there are no gaps in relation to the NSET vision for
Scotland to become a wellbeing economy, where
there is targeted action at addressing structural
economic inequalities. When priorities in terms of
the revised Corporate Plan and LOIP have been
determined, the Council could progress an
Economic Wellbeing Strategy. This would ensure full
alignment between the vision of the Scottish
Government’s NSET and local economic
development activity. 
Page 401

Page 402

Moray Council6
3 Delivery of the Moray Growth Deal
Official Signing of the Moray Growth
Deal
In December 2021, the Moray Growth Deal
Programme and the associated funding was agreed
by the Moray Council, the Scottish Government and
the UK Government. This signing of the full deal will
support economic recovery and provide £100m of
funding over a 10 year period. It signals the
confidence from both the UK and Scottish
governments as well as external project partners in
plans to drive innovation and growth in the region,
with projects within the Deal designed to maximise
Moray’s economic competitiveness. 
At the time of signing, UK Government Minister for
Scotland Iain Stewart said: “This major investment
into Moray will be truly transformational, supporting
the area, its people and businesses to reach their full
potential. 
“Projects including a world-class aerospace campus,
manufacturing innovation centre and digital health
centre will help turn Moray into a hub for
engineering, research and development, fuelling the
regional economy and creating high quality jobs.
The development of a Cultural Quarter in Elgin will
also support economic growth while proudly
showcasing the area’s unique heritage and culture. 
“The UK Government’s £32.5 million support for the
deal is part of £1.7 billion we are investing right
across Scotland to level up communities and build
back better from the pandemic.” 
Scottish Government Economy Secretary Kate
Forbes said: “I am delighted to sign the Moray
Growth Deal today confirming Scottish Government
investment of up to £32.5 million in a range of
projects that will boost the region’s economy. 
“At a time of such unprecedented challenge and
uncertainty it is important that we continue to build
strategically for the longer term to drive innovation
in key sectors, create jobs and equip local people
with the skills they need to compete for
opportunities. The growth deal package is
supporting a range of projects designed by local
partners that will do exactly that. 
Page 402

Page 403

Moray Economic Development Annual Review 2021-22 7
“Projects supported with Scottish Government
investment will improve access to sustainable
transport, deliver affordable housing, grow the
region’s visitor economy, support business growth –
including cutting edge innovation in manufacturing
– and develop the pipeline of future talent in
technology and engineering needed to support key
industry sectors. 
“The deal is about investing in local people, local
projects, and local priorities, with our partners to
create opportunities for all and I am delighted we
have reached this milestone today.” 
Some of the key outcomes from the programme
expected are: 
l Creation of 450 direct jobs
l Attracting 50,000 additional tourists
l Provision of over 300 new affordable homes 
l Help for 450 businesses to scale up 
The Moray Growth Deal consists of the 8 projects
outlined below: 
l Moray Aerospace, Advanced Technology and
Innovation Campus (MAATIC):  Establishment
of a cutting edge commercial and academically
supported training and research centre for
excellence that will provide advanced skills for
the region’s industries
l Manufacturing Innovation Centre for Moray
(MICM): A focal point for businesses to learn best
practice and collaborate, stimulating the creation
of new and growth of existing micro businesses
throughout Moray
l Digital Health: Creation of an anchored
demonstration and simulation environment
(DSE) and living lab testbeds for the Moray
region
l Bus Revolution: Increase in the number of
people using public transport to get to and from
rural areas to work, education and leisure
l Cultural Quarter: Investment in key local assets,
including the refurbishment of Grant Lodge, the
Town Hall and investment in the region’s tourism
infrastructure designed to leverage private sector
investment in a new hotel
l Early Years STEM: Growing interest in STEM
amongst children aged 3-8
l Housing Mix Delivery: Stimulating housing
development in town centres, unlocking
constrained sites and promoting the integration
of pilot exemplar sustainable design and
construction techniques
l Business Enterprise Hub (BE HUB): Provision of
education, research and business support
functions to support new business start-ups,
whilst helping to upscale existing micro
businesses 
The first project to enter delivery was Moray
Council’s partnership with the University of
Strathclyde Digital Health and Innovation Centre.
The Bus Revolution, Business Enterprise Hub, and
Moray Aerospace, Advanced Technology and
Innovation Campus projects are scheduled to
commence delivery in the 2022/23 financial year. 
Page 403

Page 404

Moray Council8
Climate Change Strategy and Routemap
On 10th March 2021 the Council adopted a Climate
Change Strategy (CCS) for 2020-2030. The strategy
set the strategic delivery approach to meeting the
Council’s goal of being carbon neutral by 2030 and
that the Council, its officers and members will work
with others across Moray to deliver that goal. The
creation of a Climate Change Team to lead, co-
ordinate and support the Strategy was agreed, with
staff recruited in October 2021. 
It was agreed that there was a need to commission
further consultancy reports for key actions relating
to hydrogen, buildings and transport. 
l Hydrogen Strategy:  to consider opportunities
for the transition of Council owned buildings and
transport fleet, associated infrastructure and
opportunities for business and industry. The
Hydrogen Strategy for Moray was adopted by
the Council on 6th September 2022.
l Transport Strategy: to develop a strategy for on
and off street public charging infrastructure for
electric vehicles and to identify a rolling
procurement programme for converting the
Councils transport fleet to low emission vehicles.
The strategy is due to be reported to committee
in February 2023.
l Buildings Strategy: to calculate current
emissions of the Council property assets and
review the planned projects through the
Property Asset Management Plan and the 10 year
Capital Plan to create an outline plan and
recommendations. Officers are developing
information on assets to establish early areas of
focus, with the Buildings Strategy due to be
reported to committee in 2023. 
The three consultancy reports will contribute to
developing the CCS to include more detailed targets,
costings, milestones and KPIs. 
On 6th April 2022 the Council adopted a Route Map
to Net Zero Carbon Emissions. This evaluated
current commitments and actions and determined
that 2030 remains in the range of possible dates
when net zero will be met. However, there is still
insufficient data to guarantee that the actions the
Council is taking to reduce carbon emissions will
meet the 2030 target with minimal carbon
sequestration. When plans on fleet and property
decarbonisation are agreed this will contribute to a
more detailed route map for the Council to reach net
zero, acknowledging the challenges around funding
which net zero presents.   
The Council, along with local partners completed
carbon calculations on the Moray Growth Deal
projects as part of business case development. This
included an economic evaluation of the impact of
carbon within the Moray Growth Deal projects for
which the Council is lead delivery partner. All council
growth deal projects are intended to operate at net
zero carbon output. 
Other economic development activity around
climate change actions during the period included
initial discussions with partners and stakeholders in
Moray relating to the Scottish Government’s Just
Transition Fund and support on how to evaluate
climate impact as part of non-cash weighting in the
procurement process. Work will be ongoing as to
how best to support small business to evidence their
climate change actions while they tender for
contracts. 
Moray’s economy is expected to undergo a
transformation in the years ahead through the
transition away from carbon intensive industries,
towards renewables and new sustainable careers.
Over the next ten years this will be accelerated
through funding from the £500m Just Transition
Fund, for which Moray is one of only three local
authorities which can access this investment. 
4 Maximising the environmental, social and
economic benefits of the transition to net
zero and Community Wealth Building
Page 404

Page 405

Moray Economic Development Annual Review 2021-22 9
Initial workshops and discussions with the Scottish
Government’s Minister for Just Transition took place
towards the end of the period, including a session
with Moray Council officers and another with Moray
Economic Partnership. An Expression of Interest for
the first round was submitted by the Council
covering a range of initiatives, with a grant of
£881,000 awarded in October 2022 to develop a
Moray Just Transition Masterplan. 
Moray Climate Assembly
Moray Council has been a key supporter of the
Moray Climate Assembly, founded and hosted by
tsiMORAY, which serves as a cross-sector melting
pot, catalysing action to deliver a just and green
recovery. The assembly’s aim is to INSPIRE new
thinking, provide a platform to SHARE the latest
environmental actions in Moray, and CONNECT
cross-sector change makers together. Anyone with
an interest in tackling climate change in Moray is
welcome to join this assembly. 
The Council has also actively supported the
development of a Moray area Climate Change
Action Steering Group, also hosted by tsiMORAY, to
regularly convene motivated and willing cross-sector
leaders within the Moray Community Planning
Partnership area to tackle climate change through a
just and green recovery leading up to COP26 and
beyond. 
Community Wealth Building 
Community Wealth Building (CWB) is a people-
centred approach to local economic development,
conceived to redirect wealth back into the local
economy and placing more control in the hands of
local people. There are five core principles, or pillars,
of CWB: 
l Progressive Procurement – Developing local
supply chains of businesses likely to support
local employment and keep wealth within
communities
l Fair Employment and Just Labour Markets –
Using anchor institutions to improve prospects of
local people by removing barriers to
employment opportunities, providing learning
and skills development opportunities, and
increasing access to career pathways
l Shared Ownership of the Local Economy –
Supporting and growing business models that
are more financially generative for the local
economy, including social enterprise,
cooperative, and employee ownership
l Socially Just Use of Land and Property –
Developing the function and ownership of local
assets held by anchor organisations, so local
communities benefit from financial and social
gain
l Making Financial Power Work for Local Places
– Increase flows of investment within local
economies by harnessing and recirculating the
wealth that exists 
As part of the activity linked to the Economic
Recovery Plan, a Community Wealth Building (CWB)
Officer was recruited by the Council in June 2021.
Charged with responsibility for developing a CWB
Strategy, the Officer prepared a Routemap to
Community Wealth Building Strategy and
Delivery which was reported to the Economic
Development and Infrastructure Services Committee
on 19th October 2021. An additional Procurement
Officer has also been successfully recruited, to assist
with CWB activity and provide increased capacity to
support the additional work associated with
accelerating elements of the Moray Growth Deal. 
Page 405

Page 406

Moray Council10
Supplier Development 
The initial focus in developing a CWB approach has
been aligned to the progressive procurement pillar,
targeted towards reducing the current level of
leakage from the local economy through public
procurement spend. A partnership approach
between Council procurement and economic
development colleagues saw the reinvigoration of a
supplier development forum. The remit of the group
is to work collaboratively in providing support for
local SMEs and social enterprises to tender for public
contracts and participate in supply chains. 
The forum includes procurement officers from HIE,
NHS Grampian, UHI Moray and Moray Council, as
well as business development officers from HIE,
tsiMORAY, and Business Gateway (BG). Initial activity
has included an exploration of current support
available for local enterprises and how procurement
opportunities can be better promoted to the local
market. At the forum meeting on 13th February
2022, a presentation was provided by the national
Supplier Development Programme at this meeting
to ensure all stakeholders were aware of the support
available to business and social enterprises, and
discuss how this could be best coordinated across all
partners.   
During 2021/22, the total value of procurement
spend with Moray based suppliers from each of the
local public anchor institutions equated to: 
Moray Council:                                        £33,874,277 
NHS Grampian:                                       £1,830,191 
UHI Moray:                                               £640,374 
Highlands and Islands Enterprise:    £51,140 
The proportion of Council spend with Moray based
suppliers increased by in excess of 2% year on year,
from 2020/21. This equated to an additional £3m
being retained in the local economy. Procurement
colleagues have advised that prior to the pandemic
the Council had seen a year on year increase in
contractual volume from 2017/18 onwards, mainly
down to the increasing use of mini competitions and
call offs from frameworks. Though this had stalled
during the pandemic with little work being done at a
local level, this trend has since reversed. A process
for capturing sub-contract spend will be devised by
the CWB Officer, to try and capture the full extent of
Council spend within the local market. This should
be in place by the start of the 2023/24 financial year.  
Through the Economic Recovery Plan a procurement
consultancy initiative was implemented to support
Moray based businesses, providing assistance with
Public Contract Scotland (PCS) registration and
tender preparation. This has included availability of
1-2-1 support via an external consultant to prepare
and write a tender bid, which was accessed by 6
businesses in Moray. 
Moray Social Enterprise Network
The Moray Social Enterprise Network (MSEN)
promotes the growth and development of the
already thriving social enterprise scene in Moray. The
network is an open door to everyone that has a keen
interest in social enterprise, whatever stage they are
at and whatever their focus. 
HIE and tsiMORAY have led the development of a
new Social Enterprise for Moray Strategy and of the
supporting Action Plan, which continues to be
relevant to and supported by the Council. This aims
to support and grow the social economy in Moray,
helping to maximise the environmental, social and
economic benefits of the transition to net zero and
Community Wealth Building. 
Page 406

Page 407

Moray Economic Development Annual Review 2021-22 11
Community Led Local Development
During 2021/22, tsiMORAY managed two ‘tests of
change’ projects funded by Scottish Government to
build on the legacy of the European Union funded
LEADER Programme: 
l Community Priorities explored how community
and stakeholder engagement centred around
community capacity building, Participatory
Budgeting (PB) and Participatory Grant Making
(PGM) could enable the LAG (Local Action Group)
to achieve a more capillary and granular
understanding of local priorities from a
community perspective as well as extend the
reach of the LAG in involving a larger number of
people in its decision-making, without detriment
to its strategic focus 
l Carbon Neutral Communities (also known as
Rural Living in a Carbon Neutral Moray) engaged
with communities across Moray to develop
materials to describe and illustrate, as well as
promote and develop, deeper and more
widespread understanding of what life in a
carbon-neutral Moray might look and feel like. It
also supported and facilitated the development,
collation and sharing of ideas, plans and actions
that can be further developed and taken forward
with and by a wide range of actors and
stakeholders to support the transition to a zero-
waste and carbon-neutral Moray. 
The two projects distributed a total of £17,898.30
through Participatory Grant Making and £17,379
through Trust Based Grant Making to community-led
projects across Moray, as well as laying the
foundation for a number of collaborative initiatives
on climate action and just transition for the future. 
Page 407

Page 408

Moray Council12
Strengthening Communities
To support community resilience and capacity, the
HIE Moray Area Strengthening Communities team
provided 32 funding awards during 2021/22. These
awards provided £759,764 towards total project
costs of £2,118,226, and supported delivery of the
following outcomes: 
Increase in the turnover in the
social economy 
Capital asset investment 
Securing external funding 
No. of organisations
supported to secure external
investment 
No. of community
organisations/social
enterprises with increased
resilience and capacity 
No. of organisations
supported to enhance digital
capacity 
No. of temporary jobs
supported 
No. of strategy workshops 
No. of board governance
health checks 
No. of Community Recovery
Fund phase 2 awards 
£273,157 
£294,502 
£501,501 
1
8
1
8
1
3
8 (£118,807) 
The Moray Area Team provided further funding for
HIE’s place based approach to supporting
community capacity and resilience in support of
Community Anchor Organisations. This included the
funding of 4 Development Officer posts in the
following Community Development Trusts: 
l Forres Area Community Trust
l Portgordon Community Trust
l Lossiemouth Community Development Trust
l Dufftown and District Community Association 
HIE retains a commitment to providing support for
organisations in relation to community assets. There
was no direct capital investment in community
owned assets during this year, however, the
following organisations were supported in their
efforts with potential asset transfers: 
l Leanchoil Trust – Funding for Development
Officer post for 12 months to continue with
community engagement and progress towards
proposed asset transfer of the former Leanchoil
Hospital in Forres from NHS Grampian into
community ownership
l Portgordon Development Trust – Business
planning support for proposed asset transfer of
Richmond Arms in Portgordon from Crown
Estate Scotland
l Forres Area Community Trust – Design and
Planning for development of Forres Town Hall
l Stramash Social Enterprise – supported to
expand Early Learning and Childcare facility in
Elgin
l Transition Town Forres and Leanchoil Trust –
Both organisations supported with social impact
forecasts to strengthen asset transfer business
plans 
In support of the net zero transition and green
recovery, HIE are also able to offer support for
community organisations to develop new assets.
Outcomes from this activity included support for
Three Kings Association in Cullen to install an EV
Charging point:   
No of assets with Net Zero Objectives                     1 
Page 408

Page 409

Moray’s Routes 
In 2021, VisitScotland announced a new fund for the
development of Strategic Tourism Infrastructure
Development Plans with the caveat that future
rounds of RTIF can only be accessed by those with
approved strategic development plans in place. In
March 2022, Moray Council secured a grant of
£31,500 with HIE providing match funding of £3,500
and Business Gateway contributing £4,850 towards
preparation of the Moray’s Routes Development
Plan. The strategic development plan will focus on
enhancing long distance active travel/leisure routes
in rural Moray to bring significant, long term benefits
to the visitor experience; positively impacting the
visitor economy and the local landscape, whilst
contributing towards the new Active Travel Strategy.
It will create a potential pipeline of projects for
Moray to reduce the pressures on communities
associated with visitor hot spots, whilst enhancing
the visitor experience. 
Moray Economic Development Annual Review 2021-22 13
From Coast to Country
Throughout the year, the Moray Council Economic
Growth and Regeneration team provided vital
support for the third sector in navigating the effects
of the pandemic, which included COVID-19 Business
Hardship Funds. Social enterprises and community
groups were also supported with applications to the
Scotland Towns Partnership, Scotland Loves Local
Fund, and the Regeneration Capital Grant Fund. 
A successful application was submitted by the
Council to the Rural Tourism Infrastructure Fund
(RTIF) for the Coast to Country project in September
2021. The project is an integral part of a Moray wide
strategic staycation programme, delivered in
partnership between the Council, Visit Moray
Speyside, HIE, and various Community Trusts and
Associations. The total investment from the project
will be £652,952, with an RTIF award of £346,065
match funded through £40,000 from HIE and
£266,887 from the Crown Estate Coastal Community
Fund. 
The project will address issues in areas that have
faced pressure on the infrastructure or had negative
impacts on communities due to significant increases
in visitor numbers, in particular from growth of the
motorhome sector during the pandemic. Some of
the improvements will include provision of camper
van parking and facilities, car parking
enhancements, signage and installation of Electric
Vehicle charging points. 
Findhorn Motorhome Stopover, included within the
Moray wide staycation programme, and funded via HIE
Page 409

Page 410

Moray Council14
Business Growth and Resilience
Business growth and resilience has suffered as a
result of the pandemic. This resulted in 31% fewer
new business start-ups through Business Gateway
(BG) between 2018-19 and 2020-21. To address this a
number of new programmes were developed by BG
within the Economic Recovery Plan to stimulate
small enterprise. 
A consultancy programme to work through the
challenges presented by Brexit was developed with
this specialist support delivered to 18 businesses,
across a total of 29 days. 
There were a further 22 businesses supported with
more complex Investor Ready advice sessions in
order to help them secure the funding needed to
grow, create new jobs, and complete business
purchases successfully. As a direct result of these
interventions total loan funding of £1.625m was
secured by these businesses. 
BG also collaborated with Developing the Young
Workforce (DYW) Moray to deliver an event at Moray
College UHI. The event was targeted at young
people to try and stimulate the entrepreneurial spirit
and encourage them to consider setting up a new
venture. 
Start-up Support
The Moray Business Start-up Grant was launched by
BG Moray on 13th September, funded jointly by the
Council and HIE. 50 businesses were approved for
finance to help them get off the ground, with the
total budget of £75,000 fully committed. These
businesses would have otherwise struggled to get
the much needed finance to do so. The impact of the
Moray Business Start-up Grant has been a positive
one with start-up numbers up by 32 compared to
2020/21. 
The project was set up to respond to the
unprecedented effects of the COVID-19 crisis on new
business start-up rates in Moray, by enabling BG to
continue to provide relevant support, specific to the
changing needs of the business community. Support
was put in place to mitigate and plan for a potential
increase in furloughed employees not being
retained once the scheme ended in September 2021
and as many of those starting new ventures were
likely to require additional financial support, to help
applicants with the capital costs related to starting a
new business venture where they meet key
eligibility criteria. 
A total of 123 Start-ups received 1-2-1 advice from
Business Gateway Moray. Start-up support was
delivered through webinars and 1-2-1 adviser
sessions, delivered both via online platforms and at
business premises. 
The new business start-ups from across the year
created an additional 176.5 FTE jobs in Moray. 
DigitalBoost
The DigitalBoost Development Grant was open to
Scottish businesses to help gain confidence with
using digital platforms. Businesses were able to
apply for grants of up to £20,000. There were 20
applications successfully processed from Moray
businesses. 
BG Moray contracted Inverness based, Tuminds to
deliver the DigitalBoost programme in 2021/22.
Throughout the year 4 digital surgeries were
delivered on specific areas of concern around digital
processes. Additionally, there have been 6 digital
projects completed with Moray businesses, and 96
Moray businesses have attended DigitalBoost
webinars. 
Through collaboration with Visit Scotland, a series of
Digital Boost webinars were also delivered for the
tourism sector, which was particularly badly hit by
the restrictions imposed during the pandemic.
5 Increasing employment levels and
number of companies
Page 410

Page 411

Moray Economic Development Annual Review 2021-22 15
Building successful, productive, and
resilient businesses
HIE have provided assistance for business in Moray
to build resilience in our key sectors through advice
and support targeted at adaptation to support
restart and recovery. 
Across the entire Highlands and Islands region, £1m
was made available through HIE to support
emerging businesses through the Young Company
Capital Investment Scheme. Grants of up £50,000
have been available for investment in equipment,
through COVID Consequential short term funds.
Within Moray, 6 businesses received support with a
total aid value of £91,771. 
HIE have undertaken work with partners and
industry to support the recovery of the tourism
sector. This has included support for the local tourist
economy via funding for the tourism destination
management organisation. In January 2021, Visit
Moray Speyside were awarded £350,000 over the 3
years in support of its Moray Tourism Recovery Plan.
Additionally, the Visit Moray Speyside Community
Toolkit was created with consultancy support from
HIE’s Support for Communities Framework. 
The toolkit provides advice for community
organisation in the management and running of
essential local facilities and provided the basis for a
successful application to the Beatrice Partnership
Fund (£48,000). The funding covered the costs of
small early-stage expenditure for community
organisations to progress a lease or Community
Asset Transfer, including valuations, condition
surveys, legal costs and provision of basic
equipment. 
To help develop awareness of opportunities
presented by new technologies and automation, HIE
have awarded funding of £690k to 4 local
businesses. This included supporting one local
business with the purchase of automated machinery
and plant to enhance processes leading to the
creation of 20 jobs and an increase in turnover of
£1.3m. 
A further 13 businesses were referred to the
innovation team for support to access tailored
support to address climate change. This included
support for a local firm to develop a feasibility
project associated with the potential to recycle CO2. 
2021/22 
123 
854 
14 
101 
102 
229 
18 
6
50
2020/21 
91 
946 
N/A 
172 
221 
161 
5
1
N/A
2019/20 
157 
901 
N/A 
N/A 
100 
155 
N/A 
N/A 
N/A
Selected Business Gateway Moray performance statistics 2021/22
New business start-ups 
Total number of enquiries 
Instances of placed-based growth support provided 
Number of start-up webinar attendees 
Number of growth webinar and investor ready attendees 
Number of digital boost attendees – 
Number of businesses receiving Brexit 1-2-1 support 
Number of businesses receiving procurement 1-2-1 support 
Number of businesses receiving a start-up grant
Page 411

Page 412

Moray Council16
HIE have delivered a programme of activities aimed
at supporting the transition to net zero and ensuring
a green recovery from the pandemic. Support
provided has included resource efficiency planning
though close collaboration with partners, which saw
10 businesses referred to Zero Waste Scotland (ZWS)
for advice and funding support. 
To embed net zero actions into client engagements
and assistance, two Moray businesses were awarded
grants totalling £366,000 supporting the creation of
33 green jobs. One of these interventions supported
the purchase and installation of innovative
technology, plant, and equipment to increase
capacity and volume of product supporting the
creation of 19 jobs and an increase in turnover of
£2.79m. While the other award of £87k supported
the purchase and installation of innovative plant and
machinery to produce low carbon modular buildings
leading to the creation of 14 jobs and an increase in
turnover of £2.4m. 
A North Highland and Moray Space Cluster
Strategy was published in September 2021, setting
out the vision that ‘by 2026 North Highland and
Moray will have established one of the most
significant Space Clusters in the UK’ and aims to
deliver a set of actions that will see real activity and
positive progress in the North of Scotland Space
sector. The report estimated that the Northern Space
Cluster could create 740 jobs in the Highlands and
Islands and boost the regional economy by £56m
per year by the end of this decade. 
Space Hub Sutherland
Space Hub Sutherland will be a
key enabler for the emerging
space cluster in the North
Highland and Moray region.
The area will also be home
to the first orbital vertical
space launch facility in the
UK, and as a result, it will be
able to leverage first-mover
advantages. These include
developing strong brand
recognition, establishing key
supply chains, and retaining and
growing the existing highly skilled
workforce in the North Highlands and
Moray region. 
The development of Space Hub Sutherland,
Sutherland Spaceport and the vehicle manufacture,
engine testing and mission control centre at Forres
means that the upstream sector is a particular
opportunity for North Highland and Moray. The
expanding Orbex launch vehicle development and
manufacturing facility at Forres forms a growing
nucleus for the space sector. There is the potential
for a clustering of innovative businesses at the Forres
Enterprise Park, complementing the existing
aviation and defence sector supply chain and talent
pool serving RAF Lossiemouth. It is vital to sustain
the emerging Moray space cluster as without a
spaceport it is highly likely that existing launch
providers will relocate. Space Hub Sutherland will
unlock further development of the Moray space
cluster and support UK and Scottish government
objectives for growing the space sector. 
North Highland and 
Moray Space Cluster
CASE STUDY  
Page 412

Page 413

Moray Economic Development Annual Review 2021-22 17
Orbex
Orbex have stated that they intend to increase their
number of employees in the Highlands and Moray
region from 90 at the end of 2021 to 400 by 2030.
Highlands and Islands Enterprise provided a
package of support to help the company establish
its operations in Moray. This included funding
towards the development of the Orbex ‘Prime’, a
micro-launcher designed to transport small
satellites, weighing up to 180kg, to low-Earth orbit. It
boasts the first commercial rocket engine designed
to work with bio-propane, a clean-burning,
renewable fuel source that cuts carbon emissions by
90%, compared to fossil hydrocarbon fuels. The
launch vehicle is poised to become the world’s most
environmentally friendly space rocket with a carbon
footprint up to 96 per cent lower than comparable
space launch programmes. 
The Enterprise Park Forres is a key asset in the
region’s emerging Space sector proposition for
both upstream and downstream activity. With
significant interest from the private and public
sector in land and buildings, HIE are considering
extending the park to be able to realise its full
potential as a high value, advanced manufacturing
hub of activity servicing several existing and
emerging sectors. HIE are moving forward with a
master planning and options appraisal exercise to
inform future infrastructure decisions. 
Northern Space Cluster Leadership Group
Officers from HIE and Moray Council have served as
representatives on the Northern Space Cluster
Leadership Group. The HIE Moray area team has
assisted with marketing the opportunities available
to space companies and the wider supply chain in
Moray. Work started this year on developing
marketing materials and a dedicated website for the
cluster. The Leadership Group will develop and drive
forward an action plan and will be instrumental in
the Space Cluster achieving its forecast potential. 
Roy Kirk: Project Director, Highlands and Islands
Enterprise 
Buckie Harbour
With the announcement surrounding ScotWind and
the decision by Ocean Wind to use Buckie Harbour
and its immediate surrounding infrastructure for
Operations and Maintenance, there is significant
investment across regional partners to stimulate the
renewables industry. Public and private sector
partners have collaborated to identify a sustainable
learning, teaching, and skills development provision
to support the offshore wind sector and its supply
chain. As a result of this investment at least 50 direct
jobs will be created, alongside the wider economic
opportunities. 
The Council has used Place Based Investment
Funding to enable site provision for both the direct
operations and maintenance, along with supply
chain opportunities. This investment was worth in
the region of £680k. Collaboration between Moray
Council and HIE has provided funding for the
creation of a Buckie Harbour Master Plan to support
this development. 
CASE STUDY   CASE STUDY   CASE STUDY
Page 413

Page 414

Moray Council18
Employment Land
Availability of land for employment purposes is vital
to meet the needs of newly forming and expansion
of existing businesses as well as for attracting inward
investment opportunities. Moray has experienced
problems historically in ensuring a suitable supply of
land is available for employment and to address this,
significant new releases of land were identified in
the Moray Local Development Plan 2020, which
included new sites at Mosstodloch and Burnside of
Birnie as well as smaller mixed use opportunities in a
number of locations such as Keith and Aberlour.
However, there are still challenges to ensure that
these land designations come forward and are
available for development. 
A Masterplan for a large employment land site west
of Mosstodloch is being progressed and has the
opportunity to link to other initiatives being
investigated by the Council such as hydrogen and
solar projects. There has been notable developments
of new private sector small business units that have
recently been completed in Elgin with 14 units
developed by Saltire at I7 Barmuckity and I8 by
Excell at I2 Chanonry. 
Moray Council’s Industrial Portfolio Annual Report
2020-21 showed continual high levels of occupancy
within the Council’s industrial portfolio with strong
demand for smaller units. The provision of further
serviced sites and units is an issue and a number of
projects are being considered with a focus on
Speyside where there are shortages and limited
private sector interest in providing units on a
speculative basis. The Council is also working with
HIE to progress opportunities in Forres to address
deficiencies in supply there. 
Meantime, HIE has responded to demand at the
Enterprise Park, Forres by obtaining consent for 8
office pods adjacent to the Horizon building and for
two small business units and are working to deliver
these. A road extension has been built to open up
part of the site for development. HIE are also
working to secure further opportunities within the
aerospace industry and progress a North Highland
and Moray space cluster. 
The Employment Land Audit 2022 identifies that
there is an established employment land supply of
226.48 ha over 36 sites, of which just over 100 ha
over 21 sites are considered to be marketable/
effective. 
There was 4.74 ha of employment land completed in
the year to 1st January 2022, including completion
of occupation of sites at I7 Barmuckity, I2 Chanonry,
I6 Linkwood east and OPP4 Ashgrove in Elgin and I1
Greshop in Forres. This is a similar level of take up
and construction as recorded in 2021 when 4.68ha
was recorded and a substantial increase in the area
of land developed prior to the pandemic, with only
1.29 ha of land completed in 2018. 
The area around Keith and Blackhillock sub station is
experiencing considerable interest in battery and
data storage type uses and officers are considering a
Masterplan process to control development
opportunities within this area and to allow for
infrastructure planning. 
To help inform future employment land
requirements in the next Local Development Plan,
officers will be carrying out a Business Needs Survey
starting in early 2023. 
Page 414

Page 415

Moray Economic Development Annual Review 2021-22 19
Town Centre Improvements
51 businesses received grants of £1.2m through the
Town Centre Capital Fund to transform empty space
into living space, convert large retail units into
smaller units and for shopfront improvement. When
the work comes to fruition it is expected to lead to
investments worth £3.8m, however, construction
costs continue to rise preventing, or challenging, the
completion of projects. Public realm improvements
are also ongoing with a total investment of £357,315
towards the work. 
There is a dedicated point of contact for Elgin town
centre with Elgin Bid, for coordinating and arranging
meetings across services in Environmental Health,
Building Standards and Planning to assist with free
pre-application advice prior to formal submission. 
A programme of Town Centre Improvement Plans
have been developed and consulted upon. The
Council commitment of £200,000 has been carried
over into 2023/24. Final versions of the plans will be
reported to Moray Council’s Planning and
Regulatory Services Committee in October 2022. 
A budget of £70,000 was identified to support the
Local Development Plan delivery programme. This
has been used to support development of
Masterplans for Town Centres and for the delivery of
a Moray Retail Study. 
A study on development of vacant and derelict land
and property has been undertaken by the Strategic
Planning and Development section, with a final
report also to be submitted to the Planning and
Regulatory Services Committee in October 2022. 
Funding will be sought for future projects identified
within these reports from appropriate sources such
as the UK Shared Prosperity Fund, Place Based
Investment Fund, and Vacant and Derelict Land
Investment Programme. 
Elgin City Centre Masterplan
The Elgin City Centre Masterplan was approved by
the Planning and Regulatory Services Committee on
16th November 2021 following an extensive period
of engagement which informed the final projects
included within the Masterplan. Proposals
within the Masterplan included; 
l Plans within Cooper Park for
bringing the pond back into
use, repurpose and extend
the toilet block into new
café and toilet facilities
and an outdoor
performance space to
complement the Cultural
Quarter Growth Deal project 
l Redevelopment of vacant, derelict
and underused historic buildings in the
Centre for a new boutique hotel, restaurant,
creative arts centre, business enterprise hub,
residential units and student social space,
supported by traffic control and streetscape
measures to encourage the development of an
evening economy and café culture 
l Taking a nature based solution to develop new
wetland park and alleviate flooding issues at the
Auction Mart and former sawmill site and provide
pockets of development as well as new junction
and active travel measures to improve
connectivity to the Centre from the south of the
City 
Page 415

Page 416

Bid to UK Levelling Up Fund
A team of Moray Council officers, supported by HIE
and other local partners, supported the preparation
of a bid to the second round of the UK Levelling
Up Fund. The bid, for an investment of £18.29m, was
submitted to the UK Government in August of 2022,
with the outcome expected to be publicised in the
autumn. 
The proposals aim to deliver on elements of the
Elgin City Centre Masterplan, which was subject to
widespread public consultation prior to its approval. 
The fund is designed to invest in infrastructure that
improves everyday life by supporting town centre
and high street regeneration, local transport
projects, and cultural and heritage assets. Proposed
projects are set to deliver significant economic,
social and environmental benefits to whole region,
including the creation of jobs. 
Aligned with the Cultural Quarter project within the
Moray Growth Deal, part of the funding package
would be used to redevelop Cooper Park by bringing
the pond back into use, creating accessible
walkways, planting for biodiversity, new seating, and
boat and paddleboard hire. 
A Central Elgin project would
support the development of
the evening economy in
Elgin and see Elgin Club
reopen after 20 years as a
boutique hotel, bar and
restaurant. The ground-floor
Reading Room will provide a
quality space for small scale
events. A proposed creative
arts centre on South Street also aims to deliver
support to the local creative community. 
The final element of the
proposals would seek to
redevelop the vacant Auction
Mart and former Sawmill sites
by Linkwood Road in the
south of Elgin, to bring
forward commercial
development. 
Moray Council20
Pop-Up Shops
As part of the Economic Recovery Action Plan,
Moray Council agreed to set-up and develop a pop-
up shop scheme to allow businesses to test the
market with a high street presence on a 4 weekly
basis. Expression of interest forms were received
from 25 new or existing businesses and 67 enquiries
were received from those interested in learning
more about the scheme. An associated grant
scheme was also established to enable participating
businesses wishing to set up a permanent base in
the town centre following a successful trial period,
to apply for a capital start-up grant of up to £10,000. 
Two pop-up shops were launched in Buckie, helping
to bring vacant properties back into use and
increase footfall in the town centre. One of the
properties in Buckie has
since secured a long term
tenant following
participation in the scheme.
Efforts are underway to
launch two pop-up shops in
Elgin High Street in the near
future, utilising Moray
Council premises which are
currently unoccupied. 
Moray Loves Local
As an extension of the
national ‘Scotland Loves
Local’ campaign led by
Scotland’s Town Partnership,
local authorities were
invited to participate in the ‘Scotland Loves Local
Gift Card’ scheme to support local businesses
emerging from the impact of COVID-19, protect
local jobs, and encourage consumers to think local
first. Moray Council participated in Year 1 of the
scheme with support from the Economic Growth
and Regeneration section. 179 businesses registered
and 119 businesses completed the on-boarding
process, including a wide range of shopping, food
and drink, accommodation services and health and
beauty businesses. The Moray Gift Card scheme was
launched in November 2021 and from December
2021 to March 2022, 54 gift cards were sold
generating £1,730 for the Moray economy. Further
dedicated support to the scheme has been
committed for the 2022-23 period. 
Page 416

Page 417

Moray Economic Development Annual Review 2021-22 21
6 A labour market that provides the required
numbers of workers to take advantage of
available opportunities-notably attraction
and retention of those aged 16-29
Moray Pathways
Moray Pathways is the
local employability
partnership in Moray.
Through Moray Pathways,
a programme of
employability activities have been launched,
through collaboration with local partners, in support
of the Economic Recovery Plan. 
On 28th June 2021, Moray Council Employability
Team, the Department for Work and Pensions (DWP),
Skills Development Scotland (SDS) and Elgin Youth
Development Group opened the new Moray
Pathways Employability and Training Hub at the
Inkwell in Elgin and in collaboration with the Café at
the warehouse employability project. 
The role of the Moray Pathways Hub is not to
replicate existing provision but to encourage a range
of additional partner resources via Moray Pathways
and was initially set up to support individuals hit by
the pandemic, who would benefit from accessing
face to face services. The partners within the wider
Moray Pathways network have access to the larger
Inkwell space and the smaller Inkwell room is a
multi-agency hot desk facility. Partners can use the
rooms to deliver training provision, digital
workshops and support workers can hold 1:1
meetings and be served refreshments in the comfort
of the café area during the day. 
The following outputs were delivered across the
period: 
l 500 individuals were engaged and supported by
Moray Pathways Network partner organisations 
l 124 people progressed into employment
opportunities
l 218 training sessions delivered 
l 36 partner organisations from the Moray
Pathways network delivered support and training
provision within the hub 
l 51 digital support sessions took place in the hub
on a 1:1 basis
l 275 digital devices were secured for households
in Moray
Page 417

Page 418

Moray Council22
Moray Employer Recruitment Incentive
The Moray Employer Recruitment Incentive (MERI)
scheme was launched in April 2021 offering up to
£10,000 for employers to provide a supported job
placement for up to 25 hours a week, for a duration
of 12 months. 
MERI was designed to assist people of all ages who
were facing the greatest barriers to employment.
The incentive was coordinated by the Moray
Pathways local employability partnership, funded by
the Scottish Government, and
administered by the Moray Council. 
Employers from Public,
Private and Third sector
organisations were able to
apply for this funding, for
newly created job
placements. Additional
funding of £420,000
was also made available
for a second MERI
strand, exclusively for
third sector and public
sector work placements, to
continue into the following
financial year. 
The fund supported individuals within the
following target groups, as agreed by the Moray
Pathways local employability partnership: 
l Long-term unemployed
l Physical and mental health conditions, including
disabilities
l Low income families and lone parents with
children experiencing poverty
l Care Experienced young people
l Minority Groups
l Veterans
l Underemployed 
Funding was approved for a total of 102 placements
with employers across the public, private and third
sectors during 2021/22. 
Mentoring Young Talent 
Mentoring young talent was launched in 2019,
however it was a vital project in the last year for
young people who were struggling with their
mental health as a result of the pandemic. The
project was supported by the Young Person’s
Guarantee funding from the Scottish Government,
the Scottish Attainment Challenge Fund for Care
experienced young people and the European Social
Fund. Outcomes in the current year included: 
l 40 Care Experienced S1-S6 pupils actively being
supported by a 1:1 Keyworker to build up a
relationship before matching them to a suitable
1:1 volunteer mentor
l 25 young people aged between the ages of 16
and 25 engaging with a keyworker from the
Mentoring Young Talent team before being
matched to a 1:1 volunteer mentor 
Kickstart
Through the Kickstart scheme, which was
administered by Department of Work and Pensions
(DWP), 6 month work placements were made
available for 16-24 year olds. Over the duration of
the scheme commenced there were 161 Kickstart
placements filled through Moray Chamber of
Commerce members. Complete Kickstart data across
Moray was not made publically available by DWP. 
Page 418

Page 419

Moray Economic Development Annual Review 2021-22 23
Developing the Young Workforce
Developing the Young Workforce (DYW) have led an
integrated approach to employer engagement with
schools to ensure every young person receives an
entitlement to work based learning. To support this
6 new DYW Co-ordinators have been recruited
across the 8 Secondary Schools in Moray. This has
resulted in new collaborative projects, as well as an
improvement in the range of work experience
placements and sector based opportunities
available for secondary pupils. 
European Social Fund
Two main projects continued to be delivered during
the year in the face of the challenges of the COVID-
19 lockdowns, for example it was particularly
difficult to obtain the required paperwork and
signatures from clients. Both of the following
European funded projects will end in March 2023. 
The Employability project, which aims to help out-
of-work people (who face barriers) to move closer to
and into work continued to be delivered by Council
staff. During the year, 25 clients were registered on
the project and received support, with 3 moving into
work. 
Towards the end of the year, the Council advertised
for other organisations to deliver European Social
Fund (ESF) funded employability projects in Moray
and 6 organisations were awarded contracts to start
in 2022. They aim to work with 372 clients with 100
moving into work (by March 2023). 
The Poverty and Social Inclusion project provided
advice and assistance to people facing financial
difficulties in Moray. This ESF funded project is
delivered by the Council who worked with 204
clients during the year, which resulted in 200
individuals having an improved financial situation. 
The Council also advertised for other organisations
to deliver similar ESF funded Poverty and Social
Inclusion projects. Two charities were awarded
contracts which started in late 2021/early 2022. They
aim to work with 110 clients, and in particular will
concentrate on families facing some kind of trauma
in their life, with 83 of them having an improved
financial situation by the project end. 
Page 419

Page 420

Moray Council24
Regional Skills Assessment
SDS has developed Regional Skills Assessments
(RSAs) for Moray and monthly Labour Market Insight
reports. RSA’s were published quarterly throughout
2021/22, and are developed to provide a coherent
evidence base to inform future investment in skills In
Moray. Built up from existing datasets and forecasts,
they offer the most detailed picture yet of the effect
the COVID-19 pandemic had on regional labour
markets. 
The latest RSA for Moray now includes high level ‘at a
glance’ infographics with accompanying context
slides to provide further insight. The reports also
contain a spotlight chapter and this iteration focuses
on regional specific data from the Scottish Employer
Skills Survey. They also feature data aimed at
illustrating the impact of the pandemic including
furlough data, job vacancies and Partnership Action
for Continuing Employment (PACE) support. Oxford
Economics forecast data has been updated in the
latest release of the RSA. These reflect, for example,
the COVID-19 pandemic, the current economic
conditions for businesses, and continued
uncertainty over Brexit. 
SDS has also developed Sectoral Skills Assessments
(SSAs), which look at current and future skills
demand in the key sectors across Scotland and
provide UHI and other partners and additional high-
level evidence base to inform future investment in
skills. 
In support of ensuring alignment between skills
provision and the changing economy, SDS have also
delivered a range of other local activities: 
l The 2021 Annual Participation Measure showed
that of the 3,572 young people in Moray who are
16-19 year old, 91.8% were in education,
employment or training and personal
development. This was slightly below the
national level of 92.2%.
l SDS has been working with UHI Moray to inform
local provision using RSAs and insight from HIE
and industry. A series of workshops and
presentations involving SDS, Scottish Funding
Council (SFC), HIE, UHI Moray, Moray Pathways,
and DYW Moray have taken place over the past
year, focussing on determining the short and
medium-term employment opportunity areas in
the economy
l SDS have provided baseline data for DYW Moray
to identify the number of new employers
referring to / engaging with the apprenticeship
family and / or other key Government initiatives
(e.g. Pathways apprenticeships)
l For each of the 8 secondary schools in Moray we
now have a partnership agreement and a
delivery plan agreed with a school coordinator
from DYW Moray. From 1st June 2021 to 31st
May 2022 we delivered 6,014 Career Information,
Advice and Guidance engagements for 3,120
school pupils through a mix of group and one-to-
one sessions
l As of 31st March 2022 there were 697 Modern
Apprentices in training, including 366 Modern
Apprenticeship starts in 21/22. 54.6% of the
starts in the local area were aged 16-24
l There were 10 registered Graduate Apprentices
with a home address in the local authority and 12
registered with employers based in the area
l A total of 43 pupils started Foundation
Apprenticeships in schools, with Moray being
outperformed by 20 other local authorities and
below the Scottish average of 93. 
7 Ensuring alignment between skills
provision and the changing economy
Page 420

Page 421

Moray Economic Development Annual Review 2021-22 25
Apprenticeships
The Delivery Framework for developing a diverse,
inclusive and sustainable economy from the Local
Outcome Improvement Plan (LOIP) set out a number
of key actions to deliver against the economic
objectives. To support the outcome of increased
participation, skill and pay levels with reduced
gender inequality through apprenticeships at all
levels, the following actions were identified: 
l Creation of a partnership apprenticeship strategy
and action plan developed for public and private
sector partners
l New apprenticeships in the public and private
sector 
A working group of partners from Moray Pathways,
consisting of officers from Moray Council, UHI Moray,
DYW Moray, and SDS is working on development of
an Apprenticeship Strategy for Moray. 
Initial research identified that there is scope for
significant growth in the availability of Foundation
Apprenticeships and Modern Apprenticeships across
the Moray Community Planning Partnership (CPP).
The research also identified a complete absence of
any Graduate Apprenticeship opportunities among
the partners. 
Coordinated delivery of an Apprenticeship Strategy
for Moray should result in significant growth in the
availability of apprenticeship opportunities locally. It
is hoped this will have a lasting impact on the local
skills base and ensure that more young talent opts
to remain in or relocate to Moray. 
Page 421

Page 422

Moray Council26
”There had been significant growth in the tourism
industry in Moray pre-COVID with record figures for
the industry for 2019 with the economic impact
reaching £134.2million, representing growth in the
industry of 67% over the past 10 years. 
Meanwhile, the equivalent of 2,911 FTE jobs were
supported by the sector in 2019 across the region,
an increase of 240 over the same period. 
Impact of COVID-19
As a result of the pandemic, tourism in the region
has seen a drastic downturn. The tourism industry’s
economic impact on the region declined from
£134m in 2019 to £58m in 2020.  Meanwhile tourist
numbers fell by 55% in 2020 year on year.  
Additional challenges and pressures facing the
sector include the lack of a major hotel operator in
the area. This has long been highlighted as an issue
with pressure on available overnight rooms and a
reliance on self-catering accommodation. 
Bounce Back
The message from the industry was that the region
was well-placed to bounce back as we possess
sufficient outdoor space, self-catering
accommodation, and capacity to meet the changing
needs of social restrictions.   
As mentioned above, historically the lack of a major
hotel operator was been seen as a major
disadvantage for the industry. However, self-catering
operators are now ideally placed to provide a
socially distanced break in our incredible landscapes. 
Moray’s tourism sector received a £350,000 boost
from HIE to help the recovery of tourism within the
region through a series of initiatives to support
businesses over a three-year period. 
The tourism industry has begun to bounce back with
a 27% increase of visitor numbers from April – June
2022 compared to the same period in 2021. This has
been supplemented with an increase in turnover of
32% compared to the previous year.   
Looking to the Future 
There are positive signs looking towards the future
of the tourism industry in Moray, but with the caveat
that there will be challenges to overcome if the
industry is to reach the aimed tourism recovery at
pre-COVID levels by 2025.   
The lack of visitors, especially those from overseas,
together with issues such as significant staff
shortages and the need to repay debts built up over
the pandemic, present challenges for many tourist
businesses. These challenges have since been
exacerbated by the pressing concerns for many of
the rising costs of energy and the imminent cost of
living crisis. 
Tourism is central to the local economy in Moray and
a vital source of rural employment. It is essential for
Moray that it continues to grow and flourish.” 
Gemma Cruickshank: Chief Executive Officer, Visit
Moray Speyside 
CASE STUDY   CASE STUDY   CASE STUDY
Page 422

Page 423

Moray Economic Development Annual Review 2021-22 27
Childcare provision
All families of 3 and 4 year olds in Moray now have
access to the flexible 1140hrs. The funded offer is
provided by a combination of 39 Private, Voluntary
and Independent settings (PVI) and 24 Local
Authority settings, this includes two privately
funded outdoor nurseries. We also have 37
childminders in contract with Moray council to offer
funded hours to 3 and 4 year olds. The service
models vary however we have some services that
offer from 8am – 6pm Monday to Friday, and
childminders may take children from earlier as may
some PVI providers. 
After families have registered they will receive
confirmation of a funded place. When they receive
this depends on their child’s date of birth. Not all
families get their first choice of nursery but all have
access to a nursery to benefit from the funded hours. 
The offer of 1140hrs also extends to Eligible 2 year
olds. We are not currently offering all those eligible
the full 1140hrs and this is something we are
working on. We believe there are a high percentage
of families across Moray that aren’t aware of the offer 
for Eligible 2’s however with the pandemic we are
not as far ahead in increasing uptake as we would
like to be. 
Community Support
The Community Support Unit (CSU) have provided a
range of support services over the period which
have helped not only with Community Learning and
Development but in driving forward economic
activity. In addition to the Moray wide Local
Outcome Improvement Plan (LOIP), two separate
locality plans have been developed for communities
in Buckie and New Elgin to address significant
challenges with deprivation. 
In Buckie, a monitoring group
carried out a review of the Locality
Plan under the three themes of
Health and Wellbeing, Economy
and Place. The Monitoring Group
have since reviewed this
information to identify future
priorities for the local
community. They have also
promoted digital health
initiatives as this fits well with
the priorities for improved connectivity and
aligns with the Digital Health Initiative project from
the Moray Growth Deal. 
The New Elgin working group have also been
revisiting their Plan and are developing a three-tier
working document which will improve the focus on
the plan and create mechanisms for tracking the
progress of priorities within it. This involves
identifying issues which are New Elgin specific, those
which take in a wider geographic area, and issues
which are Moray wide. Developing social capital
remains a key priority in recognition of the low
number of community groups and organisations in
the area. One aspect of this relates directly to the
lack of community meeting spaces and
conversations and plans are developing around how
that can be addressed.
8 Increased productivity leading to growing
wages and contributing to closing the
gender pay gap
Page 423

Page 424

Moray Council28
Support was provided for Lossiemouth Community
Development Trust to carry out a major community
survey to be incorporated into a five year plan for
the Trust. The themes of the consultation were Local
Economy; Welfare and Wellbeing and Place. The CSU
have since provided guidance on options for
progressing other workstreams not included in the
Development Trust’s own plan with other CPP
partners and stakeholders. 
Forres Area Community Trust (FACT) have been
working with the CSU in hosting community
engagement events to build on the progress that
has been made since the Forres 2020 vision, which
stemmed from the Spirit of Community event in
2015. There will be a revisit of the four thematic
areas within the 2020 vision to look at what the local
community feel are current priorities and how best
to take these forward. Support for community
anchor organisations such as this is crucial to
developing the social economy. 
The CSU team have also set out plans to support the
Lands and Parks Services through 4 separate
Participatory Budgeting exercises in Rothes, Cullen,
Findochty and Forres, with the Rothes process now
completed. Each of the 4 projects will oversee the
expenditure of a £50k budget allocation to create a
new play park. The exercise in Rothes secured positive
levels of engagement with families and a local group
secured an additional £57k to support total project
costs. Ideas were shared through the online CONSUL
platform, with 203 votes cast by pre-school, primary
and secondary age children as well as those in the
wider community. The park is due to be completed
and opened to the public later in 2022. 
Housing
Availability of land for housing is vital to meet
existing need and future demand from in-migration.
Moray enjoys a very good supply of land for housing
to meet demand. The Housing Land Audit 2022
highlights that there is an
overall established land
supply of 12,192 units
which includes extensive
areas of LONG term land,
which act as a reserve and
can be released should a
shortfall be projected. The
2022 data also highlights
that the effective housing
land supply, which is land
free of significant constraint and available within 1
five year period, is 5,365 units, which is equivalent to
a 13 year supply. 
The new National Planning Framework 4 is expected
to be approved in late 2022 and will place a greater
focus on brownfield redevelopment and support
town centre living with the resultant economic
benefits for local businesses. 
However, within the land supply, there are issues
ensuring availability of a range of house and tenure
types, particularly in Speyside, Buckie Coastal towns
and villages and in the vicinity of the Enterprise Park,
Forres. The Moray Growth Deal Housing Mix Delivery
project aims to address some of these challenges
with Council officers discussing site options with
partners. 
A new Housing Need and Demand Assessment is
currently being prepared and this will inform the
housing land requirements in the next Local
Development Plan. The Assessment will also review
the impact short term lets are having on the
availability of housing in the local market. 
Over the next 2 years, the Strategic Housing
Investment Plan is expected to provide 338
affordable homes with spend of approximately
£140m, via the investment from Scottish
Government, Housing Revenue Account (HRA) and
Registered Social Landlords (RSL). 
Page 424

Page 425

Moray Economic Development Annual Review 2021-22 29
Transport Infrastructure
The Transportation Service within Moray Council
have been supporting the delivery of projects aimed
at assisting in the transition to a low carbon
economy. This has included the expansion of the
local Electric Vehicle (EV) charging infrastructure,
with 11 new fast and rapid chargers installed or
commissioned across Moray during the year. 
New active travel infrastructure was provided in a
number of locations throughout Moray, to
encourage an increase in low carbon forms of
transport. This includes Keith, where a new active
travel path was created as part of the works
associated with a new nursery facility. 
Funding was secured for the second phase of the
Speyside Low Carbon Hub project, which will
upgrade the path infrastructure on the section of the
Speyside Way between Carron and Cragganmore.
However, this work was not completed until later in
2022. This project has transformed the section of this
nationally important long distance route, recognised
as one of Scotland’s ‘Great Trails’, between
Cragganmore and Craigellachie. These
improvements will benefit both visitors and local
residents, for whom the route provides valuable
active travel provision. 
Funding was secured to improve the active travel
connections to the new footbridge over the River
Lossie in Lossiemouth, but again this project was not
delivered until later in 2022. 
Page 425

Page 426

Moray Council30
The Moray Economic Strategy identified a suite of performance indicators to be used to assess the success of
initiatives in delivering against the strategy. The data below provides a baseline against these indicators
using the most recent data available, from which future performance can be measured. This will assist in
providing an insight into the relative health of the Moray economy. It is recognised that Moray is currently
underperforming against the national average for many of these indicators. This report highlights the action
being implemented to improve the performance of the economy:
Increased Gross Value Added (GVA) per employee 
GVA per job filled                                                                                                     Moray                            Scotland
2019                                                                                                                           £49,701                        £52,252 
Increased share of employment in higher level occupations (SOC1-3) 
Employment by occupation April 2021 – March 2022                         Moray (%)                   Scotland (%)
Standard Occupational Classification Major Groups 1-3                          43.2                               48.5
1 Managers, Directors And Senior Officials                                                   10.0                               8.4
2 Professional Occupations                                                                                16.3                               25.2
3 Associate Professional Occupations                                                             16.6                               14.7 
Increase in the number of start-ups, including social enterprises 
Number of births of new enterprises                                                            Moray                            Scotland
2020                                                                                                                           220                                17,795 
Increase in the number of businesses employing between 50 and 249 people 
Number of medium enterprises (50 to 249 employees)                     Moray                            Scotland
2021                                                                                                                           35                                   2,715 
Increase in average pay in Moray and a closing of the gender pay gap 
Gross weekly pay for full time employees                                                  Moray                            Scotland
2021                                                                                                                           £565.80                        £622.00 
Median gender pay gap                                                                                       Moray (%)                   Scotland (%)
2021                                                                                                                           22.6                               11.5 
A more balanced demographic – with greater numbers in the 16-29 age range 
Percentage of population aged 16-29                                                          Moray (%)                   Scotland (%)
2020                                                                                                                           15.11                             17.27 
Employment rate (Annual Population Survey) 
Number of people economically active in employment                     Moray (%)                   Scotland (%)
April 2021 – March 2022                                                                                     73.6%                            73.8%
9 Performance Indicators
Page 426

Page 427

Moray Economic Development Annual Review 2021-22 31Page 427

Page 428

Moray Council32 Page 428

Page 429

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 15 NOVEMBER 2022                                                                                                       
SUBJECT: PERFORMANCE REPORT (ECONOMIC GROWTH AND
DEVELOPMENT SERVICES) – PERIOD TO SEPTEMBER 2022 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the performance of the service for the period to 30
September 2022. 
1.2 This report is submitted to Council in terms of Section III (A) (4) of the
Council's Scheme of Administration to monitor performance of the services
within the Committee’s remit in accordance with the Council’s performance
management framework. 
2. RECOMMENDATION 
2.1 It is recommended that Committee: 
(i) scrutinises performance in the areas of Service Planning, Service
Performance and other related data to the end of September 2022;
and
(ii) notes the actions being taken to improve performance where
required. 
3. BACKGROUND 
3.1 On 7 August 2019, the Moray Council, approved a revised Performance
Management Framework for services (para 5 of the minute refers).   
4. SERVICE PLANNING 
4.1 Each service plan sets out the planned strategic and service level priorities
and outcomes it intends to deliver in the coming year aligning closely with
financial planning, corporate and community planning partnership strategic
priorities. This report provides an interim update on progress on the service
plan, key outcomes and performance indicators. The Committee is invited to
review progress to secure assurance that it is satisfactory and to provide
scrutiny and further direction where performance requires attention. 
Item 12
Page 429

Page 430

4.2 The narrative included is by exception, links to Service Plan Actions and
Performance Indicators can be accessed within the Backing Papers of this
report. 
Strategic Outcomes - successes 
4.3 The Apprenticeship Strategy for Moray, developed in partnership by officers
from Moray Council, UHI Moray, DYW Moray and Skills Development
Scotland was presented as planned to the Community Planning Board on 21
September 2022 (item 7a of the Agenda refers). The Strategy will contribute
to increased participation, skill and pay levels with reduce gender inequality.
(ACTION: EGD23-4.1b) 
Strategic Outcomes – challenges and actions to support 
4.4 Nothing to report.   
Service Level Outcomes - successes 
4.5  Building Standards ‘Green Status’ was achieved following the timely
submission of statutory returns to the Scottish Government, update of the
Customer Service Charter and reflection against annual performance to
identify areas for improvement. (ACTION: EGD23-5.2) 
4.6 Economic recovery continues through business, skills and infrastructure
investments; year to date there have been 75 new business start-ups through
Business Gateway creating 87 jobs in the key sectors of creative industries,
food and drink, manufacturing, construction and tourism.  In the same period
last year there were 63 new business start-ups.  Applications to the Town
Centre Capital Fund, aimed at making transformational and visual differences
to the heart of Moray’s towns have now closed.  In the two years to March
RAG
STRATEGIC
LEVEL
Partnership Apprenticeship Strategy and action
plan developed for public and private sector
partners
100%
Recover service from the pandemic response to
meet statutory requirements and duties
associated with Environmental Health and
Trading Standards
60%
Manage increased work related demands across
the existing service resources to ensure we
continue to provide an acceptable service level
when processing applications.
75%
Recover service from pandemic to enable delivery
of economic recovery plan and develop strategic
response to new funding opportunities such as
shared prosperity fund and take on responsibility
for employability
30%
Annual Economic Recovery Plan report including
KPIs 35%
Manage workloads across the service to progress
major work with the Local Development Plan
2025. New legislative requirements. Community
Wealth Building, Levelling Up Fund, Growth deal
projects and Climate change.
51%
Succession planning: identify needs and provide
apprenticeship/training opportunities, career
pathways, continuing professional development
and job-specific learning.
0%
50%OVERALL PLAN PROGRESS
SERVICE LEVEL
SERVICE PLAN PRIORITIES
2 00
13
2
SERVICE PLAN PI'S
Achieving
Target
Within
Target
Below
Target
Data Only
Data not
available at
this stage
17
Page 430

Page 431

2021, funding proposals totalling £1.7m were approved. Moray has received
an allocation of £4.3m from the UK Shared Prosperity Fund, aimed at building
pride in place and increasing life chances over the 3 years to March 2025. To
gain access to allocated funds, an Investment Plan has been submitted. 
Moray hosted the fifth Supplier Development Programme Meet the Buyer
North event in September at UHI Moray, nearly 700 businesses registered for
the event and it was a lively day for the 30+ Buyers who attended to include
officers from Business Gateway, Moray Council Procurement and Moray
Growth Deal teams. (ACTIONS: EGD23-5.3a, EGD23-5.4b, INDICATOR:
ENVDV266) 
Service Level Outcomes – challenges and actions to support 
4.7 The revised Community Safety Strategy, required by the Scottish 
Government, was approved by the Community Planning Board on 21 
September 2021 (item 6 of the Agenda refers), just out with the original due 
date of June 2022. (ACTION: EGD23-5.1b)   
5. SERVICE PERFORMANCE 
5.1  In line with the Performance Management Framework, operational
performance is reviewed quarterly by departmental management.  Areas
performing well and/or areas subject to a decreasing trend or where
benchmarking results show performance significantly below comparators will
be reported to this committee for member scrutiny. 
5.2 The narrative included in this report is by exception, links to Service
Performance Indicators can be accessed within the Background Papers at the
end of this report. Service Performance Indicators are being reviewed with a
view to enabling greater quarterly updates than are currently available. 
Operational Indicators - successes 
5.3 Nothing to report as indicator results are either not due or unavailable as a
result of changes to national reporting arrangements.   
Operational Indicators - challenges and actions to support 
5.4 Development Management and Building Standards indicator results are now
submitted to Scottish Government for validation checks, therefore subject to
slight delays with quarter 2 indicator results published in November.  
3 10
25
16
SERVICE PERFORMANCE PI'S
Achieving
Target
Within Target
Below Target
Data Only
Data not
available
45
Page 431

Page 432

5.5 In accordance with the revised Food Safety Code of Practice, food inspection
categories and frequencies have changed.  Premises have been reassessed
in terms of risk and work is ongoing to collect and report results against the
new framework. 
6. OTHER PERFORMANCE RELATED DATA 
Complaints & MP/MSP Enquiries  
6.1  In line with the Performance Management Framework, complaints are
reviewed quarterly by departmental management in terms of time taken to
respond, outcome and learning points. Links to complaints tables can be
accessed within the Backing Papers of this report. 
6.2 A total of 11 complaints were closed in the half year to September 2022, of
which 6 (55%) were frontline stage and 5 (45%) were investigative stage. As a
comparison, in the same period last year, 26 complaints were closed. 
6.3 Of those complaints closed one frontline complaint was upheld and 82% were
completed within target timescales. . 
6.4 A total of 55 MP/MSP enquiries were received during the first half of 2022/23,
all have been responded to. 
Other Performance (not included within Service Plan) 
6.5 No announcement has been made for the Levelling Up Fund bid by the UK
Government, potentially this will be announced near the end of November. 
Case Studies 
6.6 Nothing to report 
Consultation and Engagement 
6.7 Nothing to report 
7. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Performance measurement is used to ensure the efficient and
sustainable delivery of services to meet the Council’s priorities in both
the Corporate Plan and the LOIP. 
(b) Policy and Legal
The Council has a statutory requirement to publish a range of
information that will demonstrate that it is securing best value and assist
in comparing performance both over time and between authorities where
appropriate. 
(c) Financial implications
None.
Page 432

Page 433

(d) Risk Implications
None 
(e) Staffing Implications
None 
(f) Property
None 
(g) Equalities/Socio Economic Impact
An Equality Impact Assessment is not required as this report is to inform
the Committee on performance. 
(h) Climate Change and Biodiversity Impacts 
None 
(i) Consultations
The Head of Economic Growth & Development Services, Depute Chief
Executive (Economy, Environment & Finance) and Service Managers,
have been consulted with any comments received incorporated into this
report. 
8. CONCLUSION 
8.1 As at 30 September 2022 the plan overall is 43% complete, with five sub-
actions having completed in the reporting period. 
Author of Report: Christopher Dewhurst, Research & Information Officer
Background Papers: Service Plan Actions 
Service Plan Performance Indicators 
Service Performance Indicators 
Service Complaints
Ref: SPMAN-813460984-313
Page 433

Page 434

Page 434

Page 435

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 15 NOVEMBER 2022 
SUBJECT: PERFORMANCE REPORT (ENVIRONMENTAL AND
COMMERCIAL SERVICES) – PERIOD TO SEPTEMBER 2022 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the performance of the service for the period to 30
September 2022. 
1.2 This report is submitted to Committee in terms of Section III (A) (4) of the
Council's Scheme of Administration to monitor performance in accordance
with the Council’s Performance Management Framework. 
2. RECOMMENDATION 
2.1  It is recommended that Committee: 
(i) scrutinises performance in the areas of Service Planning, Service
Performance and other related data to the end of September 2022;
and  
(ii) notes the actions being taken to improve performance where
required. 
3. BACKGROUND 
3.1 On 7 August 2019, the Moray Council approved a revised Performance
Management Framework for services (para 5 of the minute refers). 
4. SERVICE PLANNING 
4.1 Each service plan sets out the strategic and service level priorities and
outcomes it intends to deliver in the coming year aligning closely with financial
planning, corporate and community planning partnership strategic priorities. 
This report provides an interim update on progress on the service plan, key
outcomes and performance indicators.  Committee is invited to review
progress to secure assurance that is satisfactory and to provide scrutiny and
further direction where performance requires attention.  
Item 13
Page 435

Page 436

4.2 The narrative included is by exception, links to Service Plan Actions and
Performance Indicators can be accessed within the Background Papers
section of this report.   
Strategic Outcomes – successes 
4.3 Nothing to report. 
Strategic Outcomes – challenges and actions to support 
4.4 Following guidance from the Scottish Government, the scope of the charging
infrastructure strategy has changed.  Costings are due with the Scottish
Government by early December and thereafter will be reported to this
committee on 7 February 2023.  In the meantime, work has progressed where
possible with Transport Scotland data analysed and locations for network
expansion identified.  (Action ECS22-25 Section 4c i). 
4.5 Work on the first draft of an investment strategy for electric vehicles is ongoing
however key information from the Electric District Network Operator has taken
longer than expected.  This may lead to a slight delay with the final strategy. 
(Action ECS22-25 Section 4c ii). 
Service Level Outcomes – successes 
4.6  Two actions have been delivered during the first half of 2022/23.  An
improvement plan for the Council’s Dredger is now in place with progress
incorporated in the Marine Safety and Operational Update report presented to
this committee on a quarterly cycle.  The new footbridge in Lossiemouth was
officially opened on 31 May 2022.  The bridge, now formally owned by Moray
Council, is fully accessible ensuring the beach is available to all including
buggy and wheelchair users. (Actions ECS22-25 - Section 5f, ECS22-25 5e). 
4.7 The rollout of free school meals to all P1-P5 pupils is complete with uptake at
the end of quarter 2 increasing to 74.6%, just below target.  Improvement has
also been noted for free and paid meals taken by P6 and P7 pupils with
uptake for these now above target at 39%.  (Action ECS22-25 Section 5g, PIs
ECSEPBCC02 and ECSEPBCC01a). 
RAG
STRATEGIC
LEVEL Growing, diverse & sustainable economy 39%
Improving the Transportation Network 25%
Growing, diverse & sustainable economy/Our Future 90%
Establishing Joint Energy from Waste Facilities 80%
Improving our operations 62%
Improving our tourism and visitor economy 100%
Delivering capital projects 30%
Delivering capital projects and promoting wellbeing 35%
Workforce development 15%
53%
SERVICE PLAN OUTCOMES
OVERALL PLAN PROGRESS
SERVICE
LEVEL
Comment:   At the end of September, the Environmental and Commercial
Services Service Plan is progressing well.  Two actions (1 Strategic and 1
Service Level) have not met original target timescales with work now planned
to continue for both during the second half of the year. 
Page 436

Page 437

Service Level Outcomes – challenges and actions to support 
4.8 Recycling in Moray fell for the second consecutive year to 52.2%.  Against all
other authorities, Moray Council is now ranked 7th highest.  To help reverse
this trend, the Waste Team have engaged with residents and commercial
customers with further PR campaigns planned.  To provide Elected Members
with a greater understanding of the recycling process, visits to the waste
transfer station are planned for November.  (Action ECS22-25 Section 5h, PI
ENV6). 
4.9 Work to develop an action plan to improve accessibility of core paths is
ongoing with the asset system configured and a Temporary Core Path auditor
appointed.  Auditing work is projected to continue until early 2023, resulting in
a delay in the delivery of a final action plan.  Originally anticipated by
December 2022, this is now expected by Summer 2023. (Action ECS22-25
Section 5jk). 
4.10 Following input from stakeholders involved with the Moray West wind farm
project, the draft masterplan for Buckie Harbour will be reviewed.  This is now
expected to be finalised by the end of quarter 3.  (Action ECS22-25 Section
5b). 
5 SERVICE PERFORMANCE 
5.1 In line with Performance Management Framework, operational performance is
monitored quarterly by departmental management.  Areas performing well
and/or areas subject to a decreasing trend or where benchmarking results
show performance below comparators will be reported to this Committee for
member scrutiny. 
5.2 Following approval of the Service Plan by Committee, a review of
performance indicators has been undertaken and amendments made to align
indicators with service outcomes. 
5.3 The narrative included is by exception, links to Service Performance
Indicators can be accessed within the Background Papers section of this
report.   
Page 437

Page 438

Operational Indicators – successes 
5.4 Average occupancy of paid car parks in Elgin continued to improve with
quarter 2 reported above (covid adjusted) target at 51%.  The Pay by Phone
app also continued to be popular, now accounting for 23.5% of all car park
payments received.  (PIs ECSTCP01 and Management PI ECSTCP04). 
Operational Indicators – challenges and actions to support 
5.5 Although still above target (£5.20), costs relating to m-connect/Dial M
Services have improved over the summer with the net subsidy falling from
£6.84 in quarter 1 to £5.76 in quarter 2.  The joint marketing campaign with
Stagecoach “On your Bus Stop” launched in September with the aim of
rebuilding passenger confidence and highlighting public transport options. 
The success of this campaign will be evaluated over the coming months.  (PI
ECSTPT01) 
6. OTHER PERFORMANCE RELATED DATA 
Complaints & MP/MSP Enquiries 
6.1 In line with the Performance Management Framework, complaints are
reviewed quarterly by departmental management in terms of time taken to
respond, outcome and learning points.  Detailed tables can be accessed
within the Background Papers section of this report.   
6.2 Between April and September 2022, Environmental and Commercial Services
received a total of 89 complaints; an increase of 5 (6%) compared to the same
period last year but 30 (25%) less than quarters 1 and 2 in 2020/21.  Against
pre-pandemic figures from the first half of 2019/20, complaints received have
fallen by 85 (49%).   
6.3 During quarter 2, 42 complaints (91%) were closed as frontline with 4 (9%)
closed at investigative stage.  35 frontline complaints (83%) received a
response within 5 working days taking an average 3.76 days.  With
investigative complaints, 2 (50%) were dealt with within the 20 working days
target with an average response time of 24.75 days.  No authorised
extensions were recorded against those complaints not meeting target
timescales.  Going forward, the Complaints Officer will liaise with
Administrators to reinforce the need for an authorised extension when the 5 or
20 working day limit is unlikely to be achieved.  Page 438

Page 439

6.4  24 closed complaints (52%) were upheld or partially upheld with 12 (50%)
categorised as Household Collections.  Most related to missed collections and
non-delivery of bins.  Each complaint has been investigated and procedures
updated to ensure requests are recorded correctly.   
6.5  In addition to complaints, 22 MP/MSP enquiries were received during quarter
1 with a further 56 in quarter 2.  Over a quarter of all enquiries related to Road
Safety with speeding concerns in particular. These enquiries relate to a range
of sites with differing speed limits, and in almost all instances recorded speeds
are within the prevailing speed limit and there are no relevant road traffic
incidents. 
Other Performance (not included in the Service Plan) 
6.6  Nothing to report. 
Case Studies 
6.7 Nothing to report. 
Consultation and Engagement 
6.8 The Catering and Procurement Teams worked together to engage with local
suppliers through a “Food for Moray” event at Elgin Town Hall in June.  Aimed
at encouraging applications for fresh food contracts, businesses had the
chance to learn about the criteria and application process and hear first-hand
the experiences of existing suppliers.   
6.9 A customer satisfaction survey, covering a range of areas within
Environmental and Commercial Services, is underway with Community
Councils.  The results of this survey are expected by the end of 2022.     
6.10  Alongside other local authorities, a National Road Survey is currently ongoing
to determine satisfaction levels and priorities of local residents and road
users.  Results are expected to be published by the Association for Public
Sector Excellence (APSE) by Spring 2023. 
Page 439

Page 440

7  SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Performance measurement is used to ensure the efficient and
sustainable delivery of services to meet the Council’s priorities in both
the Corporate Plan and the LOIP. 
(b) Policy and Legal
The Council has a statutory requirement to publish a range of
information that will demonstrate that it is securing best value and assist
in comparing performance both over time and between authorities where
appropriate. 
(c) Financial implications
None. 
(d) Risk Implications
None. 
(e) Staffing Implications
None. 
(f) Property
None. 
(g) Equalities/Socio Economic Impact
An Equality Impact Assessment is not needed because the report is to
inform the Committee on performance. 
(h) Climate Change and Biodiversity Impacts
None. 
(i) Consultations
The Head of Environmental and Commercial Services, Depute Chief
Executive (Economy, Environment and Finance), Service Managers,
Legal Services Manager, the Equal Opportunities Officer and the
Committee Services Officer have been consulted, with any comments
received incorporated into this report. 
8. CONCLUSIONS 
8.1 At the end of September 2022, progress against the Environmental and
Commercial Services Service Plan sits at 53% with two actions delivered
on time.   
Author of Report: Suzanne Wilson, Research and Information Officer
Background Papers: Service Plan Actions 
Service Plan Performance Indicators
Service Performance Indicators
Complaints Monitoring Report 
Ref: SPMAN-524642768-798 
Page 440

Page 441

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 15 NOVEMBER 2022 
SUBJECT: MARINE SAFETY AND OPERATIONAL UPDATE Q2 2022-2023 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee on matters of Marine Safety and compliance with the
Port Marine Safety Code (PMSC) for the period Q2 year 2022/23. 
1.2 This report is submitted to Committee in terms of Section III (F) (25) of the
Council's Scheme of Administration relating to the functions of Council as
Statutory Harbour Authority (SHA). 
2. RECOMMENDATION 
2.1 Committee is asked to consider and note the safety performance,
fulfilling its function as Duty Holder under the Port Marine Safety Code. 
3. BACKGROUND 
3.1 Under the statutory requirements of the Port Marine Safety Code (PMSC) the
organisation (Moray Council) must appoint a duty holder to ensure
compliance with the PMSC is achieved. The organisation must provide a
report on PMSC performance annually as a minimum. 
3.2 The role of Duty Holders is held by Members of the Economic Development &
Infrastructure Services committee. The role requires accountability for
ensuring the organisation’s compliance with the PMSC. 
3.3 At a meeting of this committee on 20 March 2018 it was agreed that a report
on PMSC would be submitted quarterly (paragraph 6 of the minute refers) 
3.4 Moray Council, in its capacity as a Statutory Harbour Authority, is committed
to undertaking and regulating marine operations to safeguard all its harbour
areas, the users, the public and the environment through its Safety
Management System (SMS). 
Item 14
Page 441

Page 442

4. Q2 Review 
4.1 The following sections of the report set out an overview of marine safety
performance for Q2 of 2022/23. 
PMSC Audit 
4.2 A full annual audit of Moray Council compliance with PMSC was carried out
by Marex Marine, within their capacity as designated person. The Audit was
conducted at Buckie Harbour Office on 12 October 2021 and concluded that
the Moray Council harbours are compliant with the PMSC. The Audit process
made observations. The open items from this are provided in the table below. 
Observation Progression
Review Harbour Bye-laws with
particular regard to continued
relevancy
Liaison with legal department required
to establish a time to review bye-laws
during 2022/23. Target Date
completion 31/03/23
Consider cyber security protocols Addition of cyber security policy to be
added to SMS during review cycle
including update of IT systems in new
harbour office. IT consultation is
ongoing with council officers during
process of office move. Target Date
completion 30/11/22
SMS updates, rewording suggestions Review of SMS completed.
Compilation draft of new document
being finalised ready to be presented
for consultation and Duty Holder
approval at end of quarter 3, Target
date completion 31/12/22.
Consideration of adding extra safety
signs around harbour
In conjunction with ongoing water
safety group meetings and work
stream considerations for signs
required to be discussed. Signs on
order and being produced currently.
Target Date for completion 30/11/22
Increasing drills carried out with
external institutions suggested
Plans to be made to include exercises
with local fire brigade large scale
cross council drill to be organised with
Aberdeenshire council with
Emergency planning officer. Target
date TBC no later than 31/03/23 
4.3 The 2022/23 Annual Audit conducted by Marex Marine will take place on 6
December with the report and findings brought to this committee at the next
scheduled date. 
4.4 It should be noted that duty holders are required to be conversant with PMSC
and its relevant content. Training for Duty Holders was provided by the
designated person on 15 August 2022. 
Page 442

Page 443

Key Performance Indicators  
4.5 Details of the Council’s compliance with PMSC are provided below. 
Q2 Accident, Incident and Near Miss Statistics 
4.6 Incident statistics Summary Table 
Quarter Injuries Incidents Near Misses
2 1 1 0 
4.7 On 26 September, Harbour Watchman boarded a fishing boat during heavy
weather (force 6 North-westerly gales) to replace a mooring line that had
broken.  The watchman boarded the vessel as the vessel owners were not
able to conduct the work themselves in an appropriate time, this action is in
line with harbour staff prescribed role and powers.  While on board moving
forward, a mooring line tightened and a weld on the vessel’s mooring bit
failed.The mooring bit, as a result, catapulted toward the quayside under
tension and struck the watchman on the left side of his rib cage. The injured
watchman was assessed and at the time of the accident showed no obvious
signs of trauma or injury. Following the incident, the injured Watchman was
sent home from work to rest and scheduled to visit the doctor the following
morning. On Friday 7 October the watchman was declared fit and no injury or
effects identified. 
4.8 Moray Council Health and Safety team was advised of the incident and
relevant incident reporting was carried out, including the watchman’s
statement of events. 
4.9 Investigation into the event has determined that there was no possible
indication that a failure of the weld was going to occur. There was no error in
mooring arrangements and the watchman was practicing safe protocols on
board, as well as wearing the full personal protective equipment required. The 
incident was a direct result of adverse weather conditions.  The dynamic risk
assessment undertaken by the Watchman indicated he should board the
vessel rather than waiting for the owner to arrive. This is considered the
correct decision as the risk of injury appeared low compared to the risk
associated with not attending to the vessel.  Communication with the vessel
owner has been ongoing to remind them of their responsibilities, with regard
to maintaining access and safe mooring whilst in harbour. 
Aids to Navigation 
4.10 As a Local Lighthouse Authority, Moray Council is required to report the
availability of all of its navigational lights to the Northern Lighthouse Board in
March of each year. Currently the Port Closed light on the North Pier in Buckie
is unavailable, resulting in availability figures being decreased. This has been
discussed with the Northern Lighthouse Board and they have noted it is not an
urgent requirement as the light is not mandatory and other provisions to
communicate any port closures are available. 
4.11 New solar powered lights will be installed in Burghead and Buckie. The new
solar powered lighting will decrease the number of faults observed and as a
result lead to an increase in the availability figures for all navigational aids.
Page 443

Page 444

This work has been funded by Scottish Government Marine Fund Scotland
Scheme. 
4.12  A risk assessment for changing the lighting system is in preparation by
Harbourmaster and after completion by end of Nov 22 will be approved by the
Northern Lighthouse Board. A Notice to Mariners has been prepared and this
will be sent to all harbour users and the UKHO so visiting vessels can be
informed of this change. 
4.13 The table below summarises the availability of Navigational lights under
Moray Council’s responsibility. 
The ‘Availability Objective’ is calculated over a rolling 3-year period. This
means that over this period a Cat 1 Aid to Navigation needs to be functional
for 99.8% of the time. Currently Moray Council is meeting this target. The
availability of Cat 2 and 3 lights is below the target availability. 
4.14 The target for the year 2022/23 is to increase the availability figures of Cat 2
lights to 95% and Cat 3 lights to 97%. This will be achieved by utilisation of
new solar powered lights that once installed, planned by end of Feb 23, will
provide more efficiency due to less reliance on unsuitable cabling, prone to
faults. 
Pilotage 
4.15 Pilotage is not compulsory at Buckie harbour, therefore, not all cargo
movements require the services of a pilot. The number of pilotage acts carried
out in the second quarter of 2022/23 was 12, in relation to 38 vessel
movements in and out of the harbour. This included 1 act of pilotage in hours
of darkness. 
Training 
4.16 There are currently two members of staff deemed competent to pilot, one
unrestricted and one restricted to daylight hours.  By end of Q3 it is
anticipated that both members of staff will be competent to pilot without
restrictions and that a third member of staff will be fully trained. Training will
begin for other harbour staff after Q3 with 2 new harbour assistants beginning
training. 
4.17  During Q2 training was completed for: 
• First aid refresher training for 2 members of staff.
• Oil spill level 3 training was completed by 1 member of staff
• Duty Holder PMSC training carried out by designated person (Marex
Marine). 
Page 444

Page 445

Training for Port Facility Security is currently being sourced to be completed
by 2 members of staff. Currently harbours are compliant with PMSC and
International ship and port facility code (ISPS) however additional trained staff
will provide additional resilience and shared responsibilities. 
Staffing 
4.18 One member of staff remains absent from work due to long term sickness and
this post is being covered by an agency appointed watchman until
Occupational Health recommendations and advice have been confirmed.   
4.19 Recruitment for MV Selkie staff is ongoing with a new recruitment round for
vessel master being undertaken during Q3/4.   
Conservancy 
4.20 Dredging has continued into the quarter 2 of 2022/23, with priority given to
Buckie navigational channel and Burghead channel. There has also been
significant work undertaken at Findochty. 
4.21 From 1 July 2022 to 30 September 2022 the total amount of spoil removed to
designated spoil grounds was 3260 Tonnes over 24 digging days. This
includes the harbours at Findochty, Burghead and Buckie (see table 2 para
4.32). 
4.22 Burghead groyne is at the end of its serviceable life, which is increasing the
deposition of sediment at the harbour channel.  A contract has been awarded
to undertake significant maintenance work to the groyne.  This work is subject
to a marine licence which is currently being progressed by Marine Scotland. 
4.23 In Buckie the current depth under chart datum is officially 2.1 Metres with
relevant Notice to Mariners promulgated. There has been significant
improvement in the depth of the channel as a result of work carried out in Q1
and Q2. Indication from Selkie and pilot boat sounding is that depth under
chart datum exceeds 2.5 metres. These soundings are subject to official
bathymetric survey of the channel  which is being organised for Q3. 
4.24 There is a Notice to Mariners published warning vessels of the fluctuating
depths within the entrance channel of Burghead advising all mariners to
contact Harbourmaster for accurate information and tidal information. 
4.25  The priority areas for dredging remain Burghead (sand bank approaching
harbour entrance) and Buckie (entrance channel).The agreed capital works to
undertake outsourced dredging, (agreed on 29 June 2022 paragraph 22 of the
minute refers,) is currently progressing with preparation works. Sediment
sampling and its analysis is being procured and conducted to satisfy Marine
Scotland licencing requirements. The planned works will incorporate work to
dredge all harbour basins in Buckie utilising a combination of Selkie and
external vessel. Other dredging requirements include:   
o Hopeman: Different options to increase the efficiency of dredging at
Hopeman are being considered and a plan detailing these will be
developed in 2022/23.
o Cullen: dredging by the Selkie will focus on the beach side of the basin.
Page 445

Page 446

o Portknockie: Work at Portknockie was undertaken in Q1 with a plan for
some minor additional work to be carried out during November.
o Findochty: Further dredging is required at the entrance channel to
complete work started in Q2. 
4.26 There has been an increase in available water under chart datum of 1.0 metre
in the west basin and channel at Findochty harbour as a result of the dredging
campaign in 2021/22. Dredging in Q2 of 2022/23 has removed 540 tonnes of
spoil from the entrance area and approach to the new pontoons, maintaining
good access to all vessels. 
Selkie 
4.27 MV Selkie has completed works within Buckie, Burghead and Findochty
during the second quarter of 2022/23. The table below summarises the work
carried out during this quarter: 
Table 1: Days worked and total tonnage removed Q2 2022/23 vsQ1 2022/23 and Q4 2021/22
Year Days
working
Weather
days
Maintenance Working
days %
Tonnage
Removed
2022/23
Q2
24 17 14 44 3,260
2022/23
Q1
30 12 20 48 3,460
2021/22
Q4
24 30 9 38 3,330 
Table 2: Summary of works carried out per harbour during Q2
Harbour Cumulative
working days
Cumulative
weather days
Cumulative
maintenance
days
Tonnage
removed
Buckie 15 13 14 2,000
Burghead 4 4 0 720
Findochty 5 0 0 540
Total (%) 24 (44) 17 (31) 14 (25) 3,260 
4.28 During the Q2 of 2022/23 there has been a slight decrease in the total
tonnage removed to spoil by MV Selkie (200 tonnes approx. 1 load) compared
to the previous quarter (Q1 3,460, see Table 1 para 4.29). This total has been
completed over 24 working days which is a decrease in working day
percentage from 48% to 44%. 
4.29 The updated figures for the current year 2022/23 are now 46% working days
25% weather days and 29% maintenance days (planned and unplanned).
This is still below the target KPI of 50% working days (see paragraph 4.35).
There has been a decrease in days lost to unplanned maintenance down to
25% however this is still not at the target of 20% or less. 
Table 3: Comparison of working days compared to weather and maintenance
Year Days working % Weather days % Maintenance %
2022/23 Total 46 25 29
2022/23 Q2 44 31 25
2022/23 Q1 48 20 32 
Page 446

Page 447

4.30 The plan for increased efficiency moving forward is to maximise the number of
days crewed on vessel and continue to work effectively with maintenance to
lower the number of maintenance days. A computer based planned
maintenance system on board Selkie and throughout the harbours is now
delivered and is currently being readied and tested for full use starting in Q3.
This system will increase efficiency of auditing maintenance, allow greater
ability to scrutinise maintenance and its history and allow remote access
monitoring of all maintenance. 
4.31 The procurement process to install Marine mammal observation equipment is
currently underway with a planned date of installation to occur in January
2023.  This equipment will allow Selkie to work in more marginal weather
conditions above a force 3 at spoil dumping grounds. This will further improve
the efficiency of dredging operations. 
Environmental Considerations 
4.32 There has been continuing work carried out with the focus on lowering carbon
emissions and promoting overall environmentally sound practices within the
harbours. This includes plans to upgrade the electrical infrastructure available
within Buckie harbour, allowing less reliance on fossil fuel generators for
power. 
4.33  KPI Summary Table 
KPI Progress at the end of Q2 Completion Target Date 
Conservancy 
Buckie Channel Depth 3.0M Current official depth 2.1M
(2.5 M sounded by pilot
boat)
31/03/23
Buckie Basin 1/2/3 depth
3.0M
Current depth 2.2M Review of progress 31/03/23
Fully achieved by 31/08/23
Provide 0.3M channel
Burghead
Current depth 0.0M Review of progress 31/03/23
Fully achieved by 31/08/23 
Productivity 
Maintenance days less than
20%
Currently 29% Continuous review
Working days greater than
50%
Currently 46% Continuous review
Total minimum tonnage
removed above 14,120
Tonnes (aspirational target
18,000 Tonnes)
End of Q2 6,720 (annual
projection therefore 13,440)
31/03/23
Total working days above
77 (target 100)
54 end of Q2 (currently on
target)
31/03/23 
Staffing 
Full Time master Q3/4 recruitment campaign
(long term skilled agency
worker currently)
30/09/22 postponed due to
staffing issues within
harbour office and reviewed
target 31/12/22 
Safety management/
Maintenance 
Page 447

Page 448

SMS review and Update Reviewed and new
document being drafted
31/10/22
Full Risk assessment update In progress annual review
completed.
31/10/22
Planned maintenance system
implementation
Procured and installed,
assets being added to
database for complete
functionality
31/08/22 
Financial 
Lower Running costs to
within Budget
To be reviewed 31/03/23 
4.34 Graph of Selkie Working availability trends 
4.35 The general pattern of Selkie working day availability compared across
quarters in 2022/23 vs 2021/22 shows a slight decrease in maintenance days
and overall a slight increase in working days. There is however still continued
improvement required to reach the desired KPIs highlighted in the table in
paragraph 4.34 above. A trend graph will continue to be added in future
reports to highlight progress toward KPIs identified for working day and
maintenance day targets. 
5. General Safety Updates 
Safety related works 
5.1 There have been a number of jobs completed during Q2 improving safety
conditions within all harbours, these works include: 
• Repair to wheeled steps
• Repaired small holes on pier 2
• Painting various equipment around harbour
• Created additional ventilation points to aid Ice Machine ventilation
2021/22 2022/23 Q1 2022/23 Q2
Working Days 39 48 44
Maintenance Days 30 32 25
Weather days 31 20 31
0
10
20
30
40
50
60
percentage of crewed days
Axis Title
Selkie working percentage trends
Working Days Maintenance Days Weather days
Page 448

Page 449

• Removal of various ropes posing a threat to vessel safety navigating
harbours
• Repair to concrete slab in the centre channel of pier 3 Buckie
• Installation and removal of handrails on pier 1 Buckie for Lady of
Avenal (Tall Ship).
• Lighthouse navigation light reinstated and windows and access
cleaned to allow safer/easier access.
• Reattached fairlead on pier 2
• Repair Burghead net store access
• Cleaned tide board Burghead
• Toilet repaired Burghead
• Cleared waste oil drums
• Weeding in Burghead
• Replaced life rings and lines all harbours
• Installed ladder top handrails where required
• Installed additional mooring rings at slipway in Findochty to make
berthing safer and easier for bigger boats.
• Portknockie slipway treated with algicide
• Barrier installed at end of west pier in Cullen to prevent persons driving
on it whilst quay repairs are being planned and carried out
• Various issues on workboat Pathfinder rectified including the power
steering and screenwasher.  Mooring lines all replaced and seats
removed from internals to create storage space for loose equipment. 
Master action List 
5.2 List of safety related jobs required to be completed in all harbours comprising the Master action list:
Priority category Number of safety
related jobs
needing
completion at
beginning of Q2
Number of safety
related jobs still
outstanding at
end of Q2
Total  safety
related jobs
completed
during Q2 
1 8 4 4
2 31 15 16
3 44 23 21
4 31 20 11
Totals 112 62 52 
5.3 Master action list is a list of all safety related jobs required within the harbours
segregated in to 4 categories. Category 1 deemed the most important. 
The remaining Priority 1 items are as follows:
• Repair to Pathfinder pilot boat steering. Repair work can be completed
without interference to vessel operations.  
• Repair works currently being completed to the North pier by a
contracted diving team as per capital plans.
Page 449

Page 450

• Work being carried out to address outages in lighting on piers in the
harbour. This work is being delivered presently by Moray Council street
lighting team. 
Signage 
5.4 The signs listed below have been ordered and will be erected when received. 
1. Four signs to restrict general access to the pontoons
2. Harbour operations signs.
3. Designated visitor berths.
4. Operational speed restrictions
5. Keep slipway clear signs. 
6. Objectives identified for remaining quarters of 2022/23 
• Publishing of updated SMS: the revised SMS will be presented to a
future meeting of this committee. 
• Undertake further reviews of Marine Policy and Harbour Bye-laws. 
• Review training requirements and request necessary training. 
• Continue momentum of Pilot training and accreditation leading to 2 fully 
competent Pilots within the Harbour team by end of Q3. 
• 2022/23 PMSC audit 6 December and provide report at end of Q3. 
7.  SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)
Sustainable harbours maintained to operate safely and efficiently
contribute to the economic development of Moray. 
(b) Policy and Legal
Non-compliance with the PMSC will have legal implications. 
(c) Financial implications
Non-compliance of the PMSC may have financial implications. 
(d) Risk Implications
Failure to comply with the PMSC could result in prosecution of the
authority. 
(e) Staffing Implications
No staffing implications arise from this report. 
(f) Property
There are no property implications arising from this report. 
(g) Equalities/Socio Economic Impact
There are no specific equalities matters, however, the Equalities Officer
has been consulted and comments incorporated into this report.
Page 450

Page 451

(h) Climate Change and Biodiversity Impacts
There are no climate change and biodiversity implications arising from
this report. 
(i) Consultations
The Depute Chief Executive (Economy, Environment and Finance),
Head of Environmental and Commercial Services, Legal Services
Manager, Head of Financial Services, Committee Services Officer (L
Rowan), and Equalities Officer have all been consulted and their
comments incorporated into this report. 
8.       CONCLUSION 
8.1 The Council is currently deemed to be compliant with the PMSC, 
however, work to maintain a safe environment remains an ongoing 
matter in a dynamic environment. Diligent staffing and constant 
monitoring and risk assessing will be utilised to maintain compliance as 
demands evolve. 
Author of Report: Stuart Akass, Harbours Development and Operations
Manager 
Background Papers: 
Ref: SPMAN-524642768-792