Page 1

Economic Development and Infrastructure Services
Committee 
Tuesday, 10 March 2026 
NOTICE IS HEREBY GIVEN that a Meeting of the Economic Development and
Infrastructure Services Committee is to be held at Council Chambers, Council
Office, High Street, Elgin, IV30 1BX on Tuesday, 10 March 2026 at 09:30. 
BUSINESS 
1. Sederunt 
2. Declaration of Group Decisions and Members Interests * 
3. Minute of meeting dated 11 November 2025 7 - 16
4. Written Questions ** 
5. Roads Asset Management Planning
Report by Executive Director Economy, Enterprise and Operations  
17 - 24
6. Update on Burial and Cremation (Scotland) Act 2016 -
Exclusive right of burial and headstone inspections
Report by Executive Director Economy, Enterprise and Operations  
25 - 50
7. Non Network Bridge Prioritisation
Report by Executive Director Economy, Enterprise and Operations  
51 - 62
8. Roads Maintenance Revenue and Capital Budgets 2026-27
Report by Executive Director Economy, Enterprise and Operations  
63 - 72
Page 1

Page 2

9. Flood Risk Management and Bridges Capital and Revenue
Budgets
Report by Executive Director Economy, Enterprise and Operations  
73 - 92
10. Transportation Capital and Revenue Budgets
Report by Executive Director Economy, Enterprise and Operations  
93 -
100
11. Environmental Protection Capital and Revenue Budgets
Report by Executive Director Economy, Enterprise and Operations  
101 -
106
12. Operations and Environment and Growth, Planning and
Climate Capital and Revenue Budget Monitoring to 31
December 2025
Report by Executive Director Economy, Enterprise and Operations  
107 -
122
13. Routemap to Net Zero and Climate Change Update 2024-
2025
Report by Executive Director Economy, Enterprise and Operations  
123 -
186
14. Local Heat and Energy Efficiency Strategy (LHEES) Update
2026
Report by Executive Director Economy, Enterprise and Operations  
187 -
216
15. Tourism Strategy for Moray
Report by Executive Director Economy, Enterprise and Operations  
217 -
240 
Information Reports - Not for Discussion at this Meeting
Any member wishing to call in a noting or information report from one
meeting shall give notice to Committee Services by 12 noon 2 clear
working days before the meeting for which the report is
published.  Please see Standing Order 38 for deadlines. The Notice
shall be countersigned by one other elected member and shall explain
the reason for call in including any action sought.   
Page 2

Page 3

Development of the Moray Film Liaison Service
Report by Executive Director Economy, Enterprise and Operations  
241 -
246 
List of Property Transactions Concluded Under Delegated
Powers
Report by Executive Director Economy, Enterprise and Operations  
247 -
260 
Summary of Economic Development and Infrastructure
Services Committee functions:
Roads Authority; Lighting Authority, Reservoirs Act 1975, Public
Passenger Transport; Flood Prevention; Twinning; Piers and Harbours and
Coast Protection; Industrial and Commercial Development;
Environmental Protection; Burial Grounds; Assistance to Industry or
Commerce; Public Conveniences; Council Transportation; Catering &
Cleaning; Land Reform (Scotland) Act 2003; Countryside Amenities;
Tourism, monitoring funding from European Programmes, youth training
and employment creation scheme and provide Architectural, Quantity
Surveying, Maintenance and Allied Property Services.     
Watching the Meeting
You can watch the webcast live by going to: 
http://www.moray.gov.uk/moray_standard/page_43661.html    
Webcasts are available to view for 1 year following the meeting.  
You can also attend the meeting in person.  If you wish to attend
in person, please come to the High Street entrance door and a
member of staff will let you into the Chamber. 
Page 3

Page 4

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how the
individual or members of the group will vote on any item(s) of business on the
Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any relevant
and competent business within the specified remits not already on the agenda, to
the Chair provided it is received by the Proper Officer or Committee Services by
5pm three working days prior to the day of the meeting, please see Standing Order
36 for deadlines.  A copy of any written answer provided by the Chair will be
published on the Council’s committee management system by 12pm the day
before the meeting.  The Member who has put the question may, after the answer
has been published, may ask one supplementary question directly related to the
subject matter at the meeting, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the consent
of the Chair. If a Member does not have the opportunity to put a supplementary
question because no time remains, then he or she can submit it in writing to the
Proper Officer who will arrange for a written answer to be provided within 7
working days. 
Page 4

Page 5

MORAY COUNCIL 
Economic Development and Infrastructure Services
Committee 
SEDERUNT 
Councillor Marc Macrae  (Chair)
Councillor Amber Dunbar  (Depute Chair)  
Councillor Peter Bloomfield  (Member)
Councillor Neil Cameron  (Member)
Councillor Tracy Colyer  (Member)
Councillor John Cowe  (Member)
Councillor John Divers  (Member)
Councillor Jérémie Fernandes  (Member)
Councillor David Gordon  (Member)
Councillor Juli Harris  (Member)
Councillor Sandy Keith  (Member)
Councillor Paul McBain  (Member)
Councillor Draeyk van der Horn  (Member)
Councillor Sonya Warren  (Member)  
Clerk Name: Lissa Rowan
Clerk Telephone: 07765 741754
Clerk Email: committee.services@moray.gov.uk 
Page 5

Page 6

Page 6

Page 7

MORAY COUNCIL 
Minute of Meeting of the Economic Development and Infrastructure Services
Committee 
Tuesday, 11 November 2025 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor Peter Bloomfield, Councillor Neil Cameron, Councillor Tracy Colyer,
Councillor John Cowe, Councillor John Divers, Councillor Amber Dunbar, Councillor
Jérémie Fernandes, Councillor David Gordon, Councillor Juli Harris, Councillor Sandy
Keith, Councillor Marc Macrae, Councillor Paul McBain, Councillor Draeyk van der
Horn, Councillor Sonya Warren 
APOLOGIES 
Councillor John Stuart 
IN ATTENDANCE 
Executive Director Economy, Enterprise and Operations, Head of Operations and
Environment, Head of Growth, Planning and Climate (Chief Planning Officer), Service
Manager Environmental Services, Service Manager Legal Services, W Burnish, Senior
Engineer (Flood Risk Management), G MacDonald, Commissioning and Performance
Officer and L Rowan, Committee Services Officer.   
1         Chair 
Councillor Marc Macrae chaired the meeting. 
2 Two Minutes Silence 
As it was Armistice Day, the Chair stated that a siren would sound at 11:00 am and,
should the Committee still be in session, encouraged all, if able, to stand during the
two minutes silence to honour the Fallen and recognise the sacrifices of all who
served in wars and conflicts across the world.  This was noted. 
2         Declaration of Group Decisions and Members Interests 
In terms of Standing Orders 21 and 23 of the Councillors’ Code of Conduct, there
were no declarations from Group Leaders or Spokespersons in regard to any prior
decisions taken on how Members will vote on any item on the agenda or any
declarations of Member’s interests in respect of any item on the agenda.  
Item 3.
Page 7

Page 8

3         Resolution 
The meeting resolved that under Section 50A (4) and (5) of the Local Government
(Scotland) Act 1973, as amended, the public and media representatives be excluded
from the meeting for the following item of business on the grounds that it involves the
likely disclosure of exempt information of the class described in relevant Paragraphs
of Part 1 of Schedule 7A of the Act. 
Paragraph
Number of
Minute 
Paragraph Number of Schedule 7a and Reason 
12 
Para 1 - Information relating to a particular employee, former
employee or applicant to become an employee of, or a particular
office-holder, former office-holder or applicant to become an
office-holder under, the authority. 
13 Para 8 – The amount of any expenditure proposed to be incurred by
the authority under any particular contract for the acquisition of
property or the supply of goods or services. 
Para 9 – Any terms proposed or to be proposed by or to the
authority in the course of negotiations for a contract for the
acquisition or disposal of property or the supply of goods or
services. 
Para 12 – Any instructions to counsel and any opinion of counsel
(whether or not in connection with any proceedings) and any advice
received, information obtained or action to be taken in connection
with— (a) any legal proceedings by or against the authority, or (b)
the determination of any matter affecting the authority, (whether, in
either case, proceedings have been commenced or are in
contemplation). 
4         Minute of meeting dated 2 September 2025 
The Minute of the meeting of the Economic Development and Infrastructure Services
Committee dated 2 September 2025 was submitted for approval. 
Under reference to paragraph 7 of the Minute “Crown Estate Coastal Community
Fund”, Councillor Cameron raised concern that the Minute did not accurately reflect
the discussion that took place and what was agreed by the Committee.  Councillor
Warren further queried the closing date for applications for the fund which appeared
to be incorrect. 
In response, the Chair advised that the Clerk would review her notes and the webcast
of the meeting and amend the Minute accordingly if necessary. 
Page 8

Page 9

Thereafter, the Committee agreed to approve the Minute of the meeting dated 2
September 2025 subject to an amendment to paragraph 7 “Crown Estate Coastal
Community Fund”, if required. 
5         Written Questions 
The Committee noted the following written question submitted by Councillor
Fernandes and the Council's response thereto:  
In light of Orkney Council’s investment in a community-owned wind farm projected to
generate approximately £3.3 million in annual revenue, what consideration has been
given by Moray Council officers to investing in wind farms, either through external
funding opportunities or by negotiating a community ownership stake in future wind
farm developments?  
RESPONSE  
Currently, community ownership, whether full or partial, is one of the options being
considered as part of Council’s approach to maximising socio-economic benefits
from windfarms in Moray. Further to a Service Plan commitment, officers are
currently developing outline approaches to enable  reporting to the Planning &
Regulatory Services Committee early next year, including a bid into the
Transformation Reserve for the economic appraisals required to underpin appraisal
of options to secure socio-economic benefits. 
As the community owned wind farm you have highlighted will be the largest council
owned windfarm in the UK, engagement with Orkney Council would be beneficial to
determine what lessons and good practice can be learnt from this ground breaking
development. 
As a supplementary question, Councillor Fernandes queried whether the Council
actively lobby windfarm developers to obtain a share of windfarms through
community ownership. 
In response, the Head of Growth, Planning and Climate advised that the Service is
currently dealing with consultations from the Energy Consent Unit which will be
considered by Committee either in due course. This was noted.  
The Committee noted a further written question submitted by Councillor van der
Horn and the Council's response thereto:  
Regarding the management of berms, for example, the flood defence embankment
on the Forres side of the River Findhorn, the Operation and Maintenance schedule
currently states:  
"Grass cut to 50–60mm length using a rotary mower and remove cuttings from the
embankment area or blow off remaining cuttings to the adjacent fence-line or toe of
the slope if no fence-line exists. Minimum of two times each year (April/May and
September/October), with additional cuts at the discretion of the Moray Council. If
grass is allowed to become too long to use a rotary mower for the initial cut, use a flail
mower/mulcher followed by a rotary mower and remove cuttings, as above."
Page 9

Page 10

My question is whether these berms could be managed in a way that
promotes biodiversity improvement, by following the schedule’s
recommended twice-yearly cut with the removal of cut material. This approach would
reduce soil nutrients that favour vigorous grass growth (creating a more open sward),
support greater biodiversity, and potentially lower maintenance costs — given that six
cuts are currently carried out each year.  
Should this adjustment prove unfeasible within the current management framework, I
would appreciate clarification on the reasons for this, supported by any available
data,  along with details of any potential alternatives or workarounds to improve
biodiversity on these green strips.  
This proposal would align with both corporate and statutory policies on biodiversity
enhancement and community wellbeing. 
RESPONSE  
Grass cutting on flood embankments and reservoir dams is a vital aspect of asset
management. This practice is undertaken for several key reasons, all of which
contribute to the safety, maintenance, and structural integrity of the flood defence
systems. 
Maintaining short grass on embankments and dams significantly improves visibility
for engineers and inspectors. This allows for clear observation of the
dam/Embankment surface, making it easier to spot signs of erosion, cracking, animal
burrows, or seepage. Enhanced visibility ensures that any issues, such as leaks or
slumps, can be detected at an early stage, preventing vegetation from obscuring the
view and delaying necessary interventions. 
The presence of tall or woody vegetation, including shrubs and trees, poses a risk due
to their deep root systems. These roots can penetrate and weaken the embankment
or dam structure, potentially leading to internal erosion or piping failure. Additionally,
long grass can attract burrowing animals such as rabbits and badgers. The tunnels
created by these animals compromise the integrity of the embankment and dam,
increasing the risk of failure. 
Maintenance is also a regulatory requirement, as stipulated by the Reservoirs Act and
Flood Risk Management Act. These laws obligate responsible authorities to maintain
their assets in a manner that enables thorough inspection and upholds the integrity of
the structures.
To mitigate the risks outlined above, a decision was made to maintain embankments
through routine grass cutting six times a year. This approach effectively reduces the
risks. The process used to maintain embankments is consistent across Moray flood
alleviation schemes. It is imperative to ensure the structural integrity of these
defences. 
Where feasible, grass cutting areas have been reduced, as seen in the Elgin flood
scheme, where flat surfaces not forming part of the flood embankment are allowed to
grow naturally and, in some cases, have been planted with wildflowers and daffodils.
However, formal slopes and embankments continue to be maintained to the
established standard.
Page 10

Page 11

While there is a strong commitment to supporting biodiversity, it remains essential to
maintain the structural integrity of embankments and dams. This ensures that, during
flood events, these assets continue to protect the livelihoods and properties of the
communities served. 
As a supplementary question, Councillor van der Horn queried how the current grass
cutting regime on flood embankments could be better adapted to support
biodiversity, in particular wildflower meadows such as through rotational mowing,
inspection strips and corridors or species selection, while still maintaining the
structural integrity and inspection, visibility and safety standards required under the
Reservoir Act and Flood Risk Management Act. 
In response, the Head of Operations and Environment advised that the grass on flood
embankments will continue to be maintained at a short level to ensure structural
integrity and inspection and that, while biodiversity will be promoted in non-structural
areas through initiatives such as wildflower planting, there are no plans to change the
maintenance regime for embankments that provide flood protection.  This was noted. 
6         Flood Risk Management Mid Cycle 
Under reference to paragraphs 6 and 7 of the Minute of the meeting of this Committee
dated 15 November 2022, the meeting had before it a report by the Executive Director
Economy, Enterprise and Operations asking the Committee to consider and approve
the Flood Risk Management plans for the NE Local Plan District and Findhorn, Nairn
and Speyside (FNS) Local Plan District.  
Following Councillor Cameron’s comments, the Committee joined the Chair in
congratulating the Service for enabling the Council to be the first Council in Scotland
to finalise all the Coastal Adaptation Plans and thereafter unanimously agreed:  
i. the Interim Report for the FNS Local Plan District, under Section 37 of the
Flood Risk Management (Scotland) Act 2009; and 
ii. extracts of the NE Interim Report that relate to the two Potentially Vulnerable
Areas (PVAs) in Moray, as drafted by Moray Council.   
7         Overnight Stays by Campervans and Motorhomes 
Under reference to paragraph 6 of the Minute of the meeting of this Committee dated
4 February 2025, the meeting had before it a report by the Executive Director
Economy, Enterprise and Operations informing Members of the outcome of the
public consultation and seeking approval on the direction of travel with regards to
introducing an overnight stay initiative for campervan and motorhomes at designated
sites in Moray. 
During discussion, Councillor Harris welcomed the trial of overnight stays for
campervans and motorhomes in Burghead however was of the view that a similar
initiative could be trialled at a suitable site in Speyside such as Alice Littler Park in
Aberlour where there are similar facilities and that this would provide data from both
Page 11

Page 12

a coastal and inland site and moved a motion in this regard.  Councillor Cameron
seconded this. 
The Chair having considered the report in detail, moved the recommendations from
Officers as printed in the report. Councillor Fernandes seconded this. 
The Head of Operations and Environment sought a short adjournment through the
Chair to consider the wider financial implications of extending the trial to include a
site in Speyside. This was agreed. 
On resumption of the meeting, the Head of Operations and Environment suggested
that the Committee consider agreeing the recommendations as printed with an
additional recommendation that a further report be brought to the meeting of this
Committee in March 2026 if officers find there is community support to extend the
pilot to Speyside for the Summer of 2026 including budget provision. 
On considering this further recommendation from the Head of Operations and
Environment, Councillor Harris agreed to withdraw her motion along with Councillor
Cameron as seconder. 
The Chair, having previously moved the recommendations as printed, stated that he
was happy to include this further recommendation in his motion. This was also
agreed by Councillor Fernandes as seconder.  
There being no-one otherwise minded, the Committee unanimously agreed: 
i. to note the contents of this report and the outcome of the public consultation
ii. to note the options in section 10 of the Report and approve Option 3, the
implementation of a 12 month pilot at Burghead; 
iii. to approve that the findings of the pilot are reported back to this committee to
assist in the future decision-making process and next steps with regards an
overnight stay initiative; and
iv. that a further report be brought to the meeting of this Committee in March
2026 if officers find there is community support to extend the pilot to Speyside
for the Summer of 2026 including budget provision. 
8         Operations and Environment and Growth, Planning and Climate Capital and
Revenue Budget Monitoring 
A two minute silence was observed during consideration of this item to remember the
Fallen and recognise the sacrifices of all who served in wars and conflicts across the
world. 
Under reference to paragraph 3 of the Minute of the meeting of Moray Council dated
26 February 2025, the meeting had before it a report by the Executive Director
Economy, Enterprise and Operations asking the Committee to scrutinise and note the
quarter one and quarter two positions of 2025/26 regarding Operations and
Environment and Growth, Planning and Climate Revenue and Capital Budgets.  
Following consideration, the Committee unanimously agreed to note the quarter one
and quarter two budget positions for 2025/2026.
Page 12

Page 13

9         Performance Report (Environmental and Commercial Services) - Period to
September 2025 
The meeting had before it a report by the Executive Director Economy, Enterprise and
Operations asking the Committee to scrutinise performance in areas of Service
Planning, Service Performance, and other related data to the end of September 2025
and note actions being taken to improve performance where required.  
Following consideration, the Committee unanimously agreed to note performance in
areas of Service Planning, Service Performance, and other related data to the end of
September 2025 and note actions being taken to improve performance where
required. 
10         Performance Report (Economic Growth and Development) - Period to
September 2025 
The meeting had before it a report by the Executive Director Economy, Enterprise and
Operations asking the Committee to scrutinise performance of Service Planning,
Service Performance, and other related data to the end of September 2025 and note
actions being taken to improve performance where required. 
During discussion surrounding development of the South Street site in Elgin,
Councillor Keith raised concern that the report stated that this would be delayed due
to complexities around housing provision on the site and further information was
sought in this regard. 
In response, the Executive Director Economy, Enterprise, and Operations could not
respond to this query within the open session due to commercial sensitivity however
advised that she would issue an update on the South Street development after the
meeting to the Committee with assurance of a further report in January 2026 if
necessary. This was noted.  
Thereafter, the Committee unanimously agreed to note: 
i. performance in areas of Service Planning, Service Performance, and other
related data to the end of September 2025 and note actions being taken to
improve performance where required; and 
ii. that an update on the South Street development would be provided to the
Committee following the meeting and a further report in January 2026 if
necessary. 
11         Blue Badge Disabled Persons Parking Concessions Procedure Report 
A report by the Executive Director Economy, Enterprise and Operations asked that
the Committee consider and adopt the updated Blue Badge (Disable Person's Parking
Concessions) Procedure which covers the application for, assessment for,
Page 13

Page 14

determination of eligibility and costs for a Blue Badge and administration of the Blue
Badge 'Scheme' currently undertaken by the Council.  
Following consideration, the Committee unanimously agreed to adopt the updated
Blue Badge (Disabled Person’s Parking Concessions) Procedure as attached at
Appendix 1 of the report subject to the proposed charge for a replacement badge
being agreed by Moray Council in accordance with the Council’s process for
reviewing charges, as set out in paragraph 5.2 of the report. 
12         Use of Dorenell Windfarm Funding for Core Path Activities [Para 1] 
Under reference to paragraph 5 of the Minute of the meeting of this Committee dated
20 June 2023, a report by the Executive Director Economy, Enterprise and Operations
sought direction and approval from the Committee for the ongoing use of the
Dorenell Windfarm Funding. 
Having considered the options set out in section 8.2 of the report in detail, the Chair
moved that the Committee agree option one, to extend the temporary contract of the
Core Path Ranger for a further 3 years and develop a new core path action plan for the
period 2026-27 to 2028-29.  Councillor Harris seconded this.  
Following Councillor Fernandes’ comments, the Committee joined the Chair in
commending the excellent work undertaken by the Core Path Ranger and, as there
was no one otherwise minded, the Committee unanimously agreed to: 
i. note the contents of the report; 
ii. note the options as shown in paragraph 8.2, the recommendation shown in
paragraph 14.1, and the associated factors as detailed in the report; and 
iii. approve option one, to extend the temporary contract of the Core Path Ranger
for a further 3 years and develop a new core path action plan for the period
2026-27 to 2028-29 as the approved use of the Dorenell Windfarm Funding.   
13         Delegation Clarification [Paras 8, 9 and 12] 
Under reference to paragraph 4 of the Minute of the meeting of Moray Council dated
19 September 2025, the meeting had before it a report by the Executive Director
Economy, Enterprise, and Operations, asking the Committee to consider the
Authority's waste management arrangements. It was noted that this report had been
submitted to Committee in terms of the Local Government (Access to Information)
Act 1985, on the Chair certifying that it requires to be considered on the grounds of
urgency relating to contract negotiations.  
Following consideration, the Committee unanimously agreed to confirm that, in
accordance with s.56 of the Local Government etc (Scotland) Act 1973, the waste
disposal function shall continue to be discharged by delegation to Aberdeen City
Council and authorises the Head of Operations and Environment to agree
appropriate terms with Aberdeen City Council.  
Page 14

Page 15

Page 15

Page 16

Page 16

Page 17

Report to: Economic Development
and Infrastructure
Services Committee 
Meeting Date: 10 March 2026  
Report by: Executive Director Economy, Enterprise and Operations      
Author: Mark Atherton Contact Email: mark.atherton@moray.gov.uk 
Subject: Roads Asset Management Planning 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to inform the committee of the latest road condition and
Roads Asset Management Planning information.  
1.2  This report is submitted to Committee in terms of Section III (F) 15 of the Council’s
Scheme of Administration relating to the function of the Council as Roads Authority.  
2.  SUMMARY  
2.1  This report highlights the current Road Condition Indicator (RCI) and ranking position
against other local authorities, as well as providing an update on Roads Asset
Management Planning (RAMP). The overall ranking confirms Moray is in a strong position,
being ranked 5th nationally.   
3.  RECOMMENDATIONS  
3.1  It is recommended that Committee:   
i)  notes the latest Road Condition Indicator (RCI) results for Moray Council;   
ii)  agrees that the RCI results continue to be monitored and reported back on an
annual basis to this committee; and   
iii)  notes the clear commitment to the use of Road Asset Management Planning
in Moray Council   
Mark Atherton
Service Manager, Roads and Fleet
Item 5.
Page 17

Page 18

4.  BACKGROUND AND CONTEXT  
4.1 The Roads (Scotland) Act 1984 places the statutory responsibility for local roads
improvement, maintenance and repair with Local Authorities.  
4.2 Local Authorities are recommended to adopt the principles of the Well Managed Highway
Infrastructure: A Code of Practice and to adapt these as necessary based on consideration
of local circumstances and apply them consistently.  
4.3 The road network represents the Council’s single largest asset (with a gross replacement
cost of almost £1.7 Bn) providing access and connectivity for the whole population for
both daily activities and to critical services / infrastructure. Therefore, regular and
adequate maintenance is vital to ensure it does not deteriorate materially or become
dangerous, and that considerable past investment is not lost. There is also an increasing
understanding of the serious consequences of failure to invest adequately and effectively
in maintaining the local road network, in particular the progressive deterioration of safety,
reliability, and quality, eventually requiring even greater levels of investment in the future.  
4.4 The network and associated asset liabilities are increasing year on year as new
developments are built and adopted.  The consequence of this is an increased pressure
on available budgets to maintain at an agreed standard without an uplift in corresponding
budget.  In simple terms, the base allocation needs a similar enhancement if standards
are to be maintained. There is budget pressure on revenue budgets due to the regular
increase in the assets that the council is required to maintain.  
4.5 It can also be reported that there has been an increase in significant localised landslip 
failures as a result of unpredictable heavy rain events experienced. The localised 
landslips do not have a material impact on the council’s RCI score as they generally 
impact a small section of the road network. However, they do have a very visible and 
clear impact on connectivity, a negative economic impact on local communities as 
well as high costs of specialist repairs. These are taken on a prioritised basis for 
capital budget consideration.  
4.6 As stated in the Capital Strategy 2024/25 report to Moray Council 4 December 2024, it is
the Council’s aim to be at the midpoint of the table for road conditions in Scotland (para
12 of the minute refers). This reduction in standard, from the council’s current position of
5th, will result in additional budget pressures in future years, as it will cost significantly
more to maintain a steady state road condition on a network with an increased (worse)
RCI. 
5.  LATEST ROAD CONDITION INDICATOR (RCI) & NATIONAL RANKINGS (2024/26)  
5.1  The condition of the council’s road network is monitored via the Scottish Road
Maintenance Condition Survey (SRMCS) which is a Scotland-wide machine-based survey,
the results of which are used to calculate a Road Condition Indicator (RCI). The RCI
provides information about which sections of a network should be considered for planned
maintenance soon, which sections should be investigated to determine the optimum time
for maintenance and which sections are generally in a good state of repair (these three
categories are colloquially known as “red”, “amber”, and “green” lengths).
Page 18

Page 19

5.2  It is worth noting how and where these SRMCS surveys are undertaken on the different
road classification types throughout Moray and what proportions of the council’s network
are surveyed each year.
• A class roads - 100% / year (in one direction; alternates direction each year).
• B & C class roads - 50% / year (in one direction; alternates each time a length of road
is surveyed).
• Unclassified roads - 10% / year (in one direction).  
5.3  The RCI figure is derived from the surveys carried out over the last 2 years for the classified
road network (A, B, C class roads), and over the last 4 years for unclassified roads.  The
overall RCI figure is therefore derived from a 100% sample of the classified network, and a
40% sample of the unclassified network.  
5.4  The RCI in Scotland is the proportion of the network falling within Red and Amber and
reported as a % figure. In simple terms, a higher percentage represents a worse road
condition. The RCI is reported to Audit Scotland every year as a Statutory Performance
Indicator.  
5.5  Table 1 below shows the council’s latest (2024-26) RCI figures and ranking position against
other Local Authorities.  The table also shows the same details for the previous 4 years.  
Table 1 : RCI (%) and ranking position 
5.6  Graphs showing the council’s RCI historical trends as well as the 2024-26 ranking among
other Scottish Local Authorities can be found in Appendix A.  
5.7  The ranking shown above is the Council’s position compared to all 32 Local Authorities,
where the 1st ranking is the best and the 32nd ranking is the worst.  Any movement in
ranking may be due to a change in the council’s road condition but can also be due to the
road condition in other authorities improving or deteriorating depending upon how they are
prioritising investment in their road network.  
5.8  It can be noted from Table 1 above that the council’s A Class, B Class and C Class roads
have improved from last year’s results as their respective RCI scores have all decreased.
However, Moray’s Unclassified roads have seen an increase in RCI of 3.4% which indicates
a worsening of the road network.  
Page 19

Page 20

5.9  The whole network RCI score has increased by 0.5%, which indicates that the overall road
condition has deteriorated.  Appendix A details the council’s score in comparison with
other Scottish authorities.  
5.10  The scores for the unclassified network are the most unreliable component of the RCI (due
to its small sample size – only 40% of the U Class network is considered), however due to
Moray’s network being almost 50% unclassified, these scores can have a
disproportionately positive or negative effect on the whole network RCI.  
5.11  Table 2 below contains the Scottish Average RCI over the last 10 years and shows a 2%
improvement (decreasing RCI) over that period.  The Moray RCI increased by 1.2% in that
same period.  
Table 2 : Scottish Average RCI (%) 
6.  SCOTS Backlog and Steady State Report 2023  
6.1 Scottish Collaboration of Transport Specialists (SCOTS) routinely publish a Backlog and
Steady State Report utilising the results of SRMCS surveys.  The last time this published
was 2023 surveys, with the previous report being published in 2019.  
6.2 According to the report, Moray’s backlog figure, which is the estimated cost to treat all
sections of road that were classified as red or amber, was £46.469m.  This was a decrease
from 2019, due to the improvement in Moray’s RCI between the reports.  
6.3 Across all Scottish Authorities the backlog figure increased by £2.196bn (16.3%) from the
last report, which has primarily been attributed to increases in treatment costs since
2019.  
6.4 According to the report Moray’s steady state figure, which is the estimated cost to
maintain the network (accounting for annual deterioration) in its current condition for ten
years, was £11.287m per year.  This was a slight reduction from 2019, again due to the
improvement in RCI between the reports.  
6.5 Across all Scottish Authorities, the steady state figure decreased by £12.1m (3.5%) since
2019.  This has been attributed to a general improvement in the road condition across
Scotland, which can be evidenced in the improvement in the Scottish Average RCI
between reports. 
Page 20

Page 21

7. ASSET VALUATION  
7.1 Utilising SCOTS Road Asset Management Planning (RAMP) tools, officers carry out a
valuation across various Environmental and Commercial Services road related assets
annually.  Below are the results for 2024/25.   
Table 3 – Roads Asset Value (as at 31/03/25) 
8 OUR ASSET MANAGEMENT APPROACH  
8.1 The Road Maintenance Capital Programme is prepared by utilising an asset management
approach.  This involves using robust data to make informed decisions about how the
council manage and maintain the road network as effectively as possible.  
8.2 The benefits of this approach are widely recognised.  Both local and national governments
have stressed the importance of road asset management in order to deliver some of the
required public-sector efficiencies and nearly all roads authorities now either have an
asset management plan or are actively working on one.  
8.3 Asset management is an approach which focuses on getting the best long-term value for
money as opposed to a short-term approach which might prioritise immediate repairs over
preventative work to preserve the asset and extend its life.  In taking this approach, officers
look at the long-term costs and consequences of the choices being made.  In short, asset
management is all about evidence-based decision making.  
8.4 This means that Road Maintenance officers will consider maintenance options over a
much longer term to plan for the most appropriate treatment at the most appropriate time
rather than automatically fixing the roads which look worst.  This approach enables the
best use of the limited resources available, though this can sometimes cause confusion
when the public see the council working on roads that appear to be in better condition
than others.  
8.5 Maintaining the roads asset at its current condition requires additional investment due to
inflation, network growth and normal ongoing deterioration.  
Page 21

Page 22

9 SUMMARY OF IMPLICATIONS  
9.1 The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  X
Policy and Legal X 
Financial  X
Risk X 
Staffing  X
Best Value and Transformation  X
Property  X
Information Communications Technology/Digital  X
Equalities. Social Inclusion and Economic Impact   X
Climate Change and Biodiversity Impact  X 
9.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population 
9.3 Policy and Legal 
The Council is responsible for the maintenance of 1564km of road network which have
been adopted by the Local Authority in terms of the Roads (Scotland) Act 1984. The Act
places a duty on the Local Authority to maintain the roads, lighting units and structures so
adopted, but does not prescribe the level of maintenance to be delivered.  The Well-
managed Highway Infrastructure Code of Practice identifies good practice, and
consideration has been given to this advice.  
9.4 Financial 
None arising from this report. 
Page 22

Page 23

9.5 Risk 
Pressure on the Revenue general maintenance budget will increase in terms of reactive
maintenance as carriageway conditions deteriorate.  This deterioration will also increase
the backlog and steady state figure mentioned in Section 6 of this report.  
9.6 Staffing 
None.  
9.7 Best Value and Transformation 
None.  
9.8 Property 
None.  
9.9 Information Communications/Technology/Digital 
None.  
9.10 Equalities, Social Inclusion and Economic Impact 
None.  
9.11 Climate Change and Biodiversity Impacts 
None. 
10 CONSULTATION  
10.1 This report has been prepared in consultation with Executive Director Economy, Enterprise
and Operations, Head of Operations and Environment, Chief Financial Officer, Service
Manager Legal Services, Services Manager People Management, Equal Opportunities
Officer, and L Rowan, Committee Services Officer and any comments made have been
incorporated into the report.   
11 BACKGROUND PAPERS  
11.1 None   
Page 23

Page 24

Appendix A 
Page 24

Page 25

Report to: Economic Development
and Infrastructure
Services Committee 
Meeting Date: 10 March 2026  
Report by: Executive Director Economy, Enterprise and Operations      
Author: Paul Wolverson Contact Email: Paul.wolverson@moray.gov.uk 
Subject: Update on Burial and Cremation (Scotland) Act 2016 - Exclusive right of
burial and headstone inspections 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to update and inform Committee of the statutory
requirements on the Council, as a burial authority, in line with the Burial and Cremations
(Scotland) Act 2016.  
1.2  This report is submitted to Committee in terms of Section III (F) (14) of the Council’s
Scheme of Administration relating to providing and maintaining all burial grounds.  
2.  SUMMARY  
2.1  The Burial and Cremation (Scotland) Act 2016 received Assent in 2016.  On 14 November
2024 the Scottish Government laid four key sets of regulations before the Scottish
Parliament, marking a significant step in the implementation of the Burial and Cremation
(Scotland) Act 2016. On 8 January 2025 the Scottish Government announced the
measures within the act which will come into force either from 1 March 2025 or 1 March
2026. 
2.2 Members have previously been made aware of the measures coming into force as detailed
below, but this report provides a further update with regards the Council’s statutory
responsibilities as a burial authority relating to the exclusive right of burial and headstone
inspections.  
Item 6.
Page 25

Page 26

3.  RECOMMENDATIONS 
3.1  It is recommended that Committee:   
i)  note the regulatory changes effective from the 1 March 2026 regarding the
exclusive right of burial as detailed in section 4.1; 
ii)  note and approve the Headstone Inspection Policy as detailed in Appendix 1;
recognising that a further update to the policy will be presented to committee
for approval once the changes regarding headstone inspections have been
embedded within the burial service; and   
iii)  note that a headstone inspection team will be created to meet the Council’s
statutory obligations with regards headstone inspections.   
Paul Wolverson
Service Manager Environmental Services 
4.  BACKGROUND AND CONTEXT  
4.1  As previously reported to members of this committee on 29 April 2025, (para 12 of the
minute refers), the Burial and Cremation (Scotland) Act 2016 (Commencement no. 6)
Regulations 2024 mandated that the right of burial is extinguished after 25 years for new
lairs purchased from 1 March 2026. Thereafter Rights can be extended for 10 years at a
time.  The right to erect a headstone is also extinguished in line with the right of burial.  
4.2  Communications have taken place with Funeral Directors to make them aware of the
changes so that they are able to communicate this with families.  Lair Certificates, and the
supporting information provided to the lair holder, have also been updated to reflect the 25
year term.    
4.3  The Burial (Management) (Scotland) Regulations 2025 have mandated that burial
authorities must carry out scheduled inspections of headstones (frequency is not
specified).  The Council approved its headstone inspection procedure in 2017.  A link to
the committee report is found here and memorial headstone stabilisation procedure  is
found here. 
4.4  Since 2017, the headstone stabilisation procedure has been developed and updated
internally, which included a planned regime of inspecting 4 cemeteries a year,  as the
service has meantime gathered more knowledge around the practicalities of undertaking
headstone inspections, and an indication on the level of resources needed to carry out
such functions. However, most importantly the Burial and Cremation (Scotland) Act 2016
Page 26

Page 27

has now mandated that from 1 March 2025, burial authorities must undertake scheduled
inspections of headstones.  
4.5  It has become apparent that the current regime of inspecting 4 cemeteries a year, is not
deliverable using the current resources and operating model. Over the last two years
inspections have only been able to be undertaken in two cemeteries per year, together
with a number of re-inspection of headstones. Given the number of burial grounds in
Moray , carrying out headstone inspections in 2 cemeteries a year results in an inspection
frequency of circa once every 31 years.      
4.6 Headstone inspections have been undertaken at the below cemeteries: 
• Birnie
• Botriphnie
• Cullen
• Deskford
• Knockando
• Lhanbryde Old
• Lossiemouth Old
• Tomintoul Old  
4.7 Once a cemetery has been inspected, this creates additional work demands through the
need to reinspect headstones which are deemed safe at the time of assessment, but
require further assessment within a prescribed period (1 year/5 years) to ensure they
remain safe.  The current operating model of temporarily deploying staff and back filling
using seasonal staff is therefore not sustainable against a backstop of an ever-increasing
work demand. The current system leaves the Council open to potential challenges
regarding compliance with the regulations.      
4.8 The burial service is a cost recovery service and, as previously reported to members, costs
relating to improved headstone inspections have been included within the cost recovery
model since this operating model has been established.  Analysis and review of the
viability of the current operating system has shown that the current regime and level of
resources is not  sustainable in terms of regulatory compliance. 
5.  PROPOSALS  
5.1  A headstone inspection policy has been created to support the operational headstone
procedure and to assist with compliance with the burial regulations.  The document
provides a policy position based on the Council’s current approach to headstone
inspections. A copy of the policy is shown in Appendix 1.  
5.2  It is recognised that whilst the regulations do not stipulate a frequency for inspections, the
current inspection regime equates to once every 31 years and would not be classed as a
Page 27

Page 28

reasonable time period for a scheduled inspection. The intention is therefore to create a
dedicated headstone inspection team whose primary role will be to undertake headstone
inspections.  The aim is to implement a scheduled inspection frequency of every 5 years,
which is considered good industry practice by Scottish Government and the Health and
Safety Executive.   
5.3  Costs for improved headstone inspections and the creation of a headstone inspection
team are already included within the cost recovery model.   The cost of creating a
headstone inspection team does not have any additional impact on the burial fees and
charges for 2026/27.  However, the creation of this team will provide burial service
resilience and help the Council meet its statutory obligations regarding headstone
inspections.    
5.4  The Council’s ‘Management rules for all cemeteries and burial grounds’ were approved on
5 September 2023 (para 9 of the minute refers). The rules have been updated to reflect the
regulatory changes.  
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  X
Policy and Legal X 
Financial X 
Risk X 
Staffing  X
Best Value and Transformation X 
Property  X
Information Communications Technology/Digital             X
Equalities. Social Inclusion and Economic Impact           X 
Climate Change and Biodiversity Impact  X 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
Page 28

Page 29

☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population 
6.3  Policy and Legal 
Under the Burial and Cremation (Scotland) Act 2016 the Council is classed as a burial
authority. As a burial authority that Council is mandated and has a statutory responsibility
to comply with the provisions of the Act and its associated regulations, including
undertaking scheduled inspections of headstones.  
6.4  Financial 
It is estimated that the annual staffing costs associated with creating a headstone
inspection team is circa £80,000 (staff/vehicle costs), The  additional resources needed
to ensure compliance are included within existing budget. There is the potential that the
number of lair sales and interments needed for the service to be cost recovery, is not
achieved. In such circumstances there would be a financial impact. However, any impact
cannot be determined at this stage. 
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend this
Year
Virement
From
Other
Comments       
Annually Recurring Costs:
Service Area Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments
Environmental
Services 
Burial
Grounds
1/04/26 Circa
£80,000 
Costs are
already
included
within the
cost
Page 29

Page 30

recovery
model so
no
additional
funding
required 
6.5  Risk 
The risk of not complying with the requirements of the Burial and Cremation (Scotland) Act
2016 is that that the Council would be liable for a prosecution/ fine. 
A current scheduled inspection frequency of once every 31 years increases the health and
safety risks relating to unstable headstones and the risk of these falling on site users. 
There is the risk that the number of lair sales and interments needed for the service to be
cost recovering is not achieved.  
6.6  Staffing 
There are no implications for current staff associated with the recommendations in this
report.  A headstone inspection team (comprising of 2 people) will need to be developed
and appointed, which will be funded through the burial service.  
6.7  Best Value and Transformation 
The burial service is based on a self-funding cost recovery model.  
6.8  Property 
There are currently no property implications associated with this report.  
6.9  Information Communications/Technology/Digital 
There are no implications relating to information communications/technology/digital.  
6.10  Equalities, Social Inclusion and Economic Impact  
An IIA has been completed and is shown in appendix 2.  
6.11  Climate Change and Biodiversity Impacts 
There are no climate change implications as a result of this report. 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with Executive Director Economy, Enterprise
and Operations, Head of Operations and Environment, Chief Financial Officer, Service
Manager Legal Services, Service Manager People Management, Equal Opportunities
Page 30

Page 31

Officer, and L Rowan, Committee Services Officer and any comments made have been
incorporated into the report. 
8.  BACKGROUND PAPERS  
8.1  ED&I 29 April 2025   
Page 31

Page 32

Appendix 1 
Headstone/Memorial Inspection Policy 
Page 32

Page 33

Contents
1. Background .................................................................................................................................. 10
2. Cemetery Provision in Moray ...................................................................................................... 10
3. Legislation .................................................................................................................................... 10
4. Scheduled inspections ................................................................................................................. 10
5. Risk Based Approach .................................................................................................................. 11
6. What is the Risk ............................................................................................................................ 11
7. Responsibility and Liability ......................................................................................................... 11
8. Resources and budget for headstone inspections .................................................................... 12
9. Frequency of headstone inspection ............................................................................................ 13
10. Training ....................................................................................................................................... 13
11. Inspection process and making safe ........................................................................................ 14
12. Record Keeping .......................................................................................................................... 14
13. Communication .......................................................................................................................... 15
14. Partnership Working .................................................................................................................. 15
15. Types of memorial ...................................................................................................................... 16 
Page 33

Page 34

1.    Background 
Burial Ground Authorities must have systems in place to control the risks from
headstone/memorials to their employees, contractors, volunteers and members of the
public. Responsibility for the overall safety (Duty of Care) within a cemetery lies with
the Burial Authority, which has responsibilities under the Health and Safety at Work Act
1974 to ensure that, as far as reasonably practicable, their sites are maintained in a
safe condition. The owner of the memorial is responsible for maintaining the memorial
in good condition. 
2. Cemetery Provision in Moray 
The Council currently manages and maintains 63 cemeteries across Moray.   
3. Legislation 
Under the Burial & Cremation (Scotland) 2016 Act, Regulation 4 of the Burial
(Management) (Scotland) Regulations 2025 mandates that from 1 March 2025 a burial
authority must carry out scheduled inspections of headstones. 
In these regulations ‘’scheduled inspection” is a regular inspection of headstones and
other memorials to ensure they are in safe order.
4.  Scheduled inspections 
The Council approved its Headstone Stabilisation Procedure in October 2017.  This
policy updates that document. 
Since the introduction of the procedure the Open Space team has trained staff in
carrying out headstone inspections and developed operational procedures and risk
assessments/method statement to ensure that inspections are undertaken in a safe
and compliant manner.  This includes ensuring that relevant consents are secured via
Historic Environment Scotland and with the oversight of archaeologist at listed sites. 
The service currently aims to inspect 4 cemeteries a year, however, based on the
resources available, and the level worked involved in undertaking both new and re-
inspections, the number of cemeteries which can be inspected is two per year, with this 
potentially be less if the cemetery is large.   
Page 34

Page 35

Within the regulations there are no prescribed timescales which define what is classed
as a regular inspection. 
Scottish Government and the Health and Safety Executive support an inspection
frequency of at least once every five years. 
5.  Risk Based Approach 
The scheduled inspection process is based on a risk-based approach with cemeteries
being grouped into 4 categories.  The criteria for each category is based on matters
relating to: 
• Location of cemetery
• Whether there is an active church
• Visitor numbers
• Height of the majority of the headstones within the cemetery
• Presence of anti-social behaviour or congregation points
• Main stone type of headstones within the cemetery 
The cemeteries within each category are shown in appendix 1. 
6.  What is the Risk 
The main risk associated with headstone stabilisation relates to a
headstones/memorial falling and causing personal injury or death.  The main groups
considered to be at risk are: 
• Burial staff who work in the cemeteries
• Visitors to cemeteries
• Funeral congregations
• Children who may use cemeteries as a play area
• Funeral Directors
• Stone masons
• Others, e.g. contractors 
7.  Responsibility and Liability 
Responsibility for the overall safety within a burial ground lies with the Council which
has responsibilities under the Health and Safety at Work Act 1974 and the Occupiers’
Liability (Scotland) Act 1960 to ensure that, as far as reasonably practicable, their sites
Page 35

Page 36

are maintained in a safe condition. This includes ensuring that anyone who enters the
site to carry out work, such as a memorial mason, carries out this work in a safe
manner and in such a way that others using the site will not be put at risk. 
Whilst the responsibility for general safety lies with the Council there are specific
responsibilities for memorials that lie with both the owner of the memorial and the
memorial mason responsible for installing it. The owner of the memorial is responsible
for maintaining the memorial in a good condition and is informed of their and other
parties responsibilities in the Council’s Management Rules for all Burial Grounds and
Cemeteries.   
Memorial masons are legally liable for the work they carry out and should ensure that
memorials are erected safely and in accordance with current standards available within
the industry (such as quality specifications like the NAMM Code of Working Practice or
similar). This responsibility is placed on masons in the Consumer Protection Act 1987,
the Sale of Goods Act 1979 (amended 1994), the General Product Safety Regulations
2005.  The Council’s Management Rules for all Burial Grounds and Cemeteries
requires any new headstone to be installed in accordance with British Standards –
BS8415. 
8.  Resources and budget for headstone
inspections 
The Council does not currently have a dedicated headstone/memorial inspection team. 
The current operating model is based on deploying existing Gardeners/Team Leaders
on headstone inspections for around 8 weeks per year. Temporary seasonal staff are
employed to backfill the duties of the Gardeners.   
Additional resources from the Grounds Maintenance teams may also be deployed to
assist on headstone inspections, particularly re-inspections.     
In accordance with industry good practice any inspections are carried out by a team of
at least two people. 
In addition to covering seasonal staff costs, the budget allocated to headstone
inspections is also used to: 
• Cover the cost of making safe any headstones (equipment, fencing, signage,
lifting gantry)
• Cover the cost of any specialist external equipment/advice needed to address
defects (where applicable) 
The current operating model and budget allocation only allows for a limited inspection
frequency.   
Page 36

Page 37

9.  Frequency of headstone inspection 
The current aim is to inspect 4 cemeteries a year.  Based on 63 cemeteries this
equates to all headstones being inspected on a ‘scheduled inspection’ frequency of at
least once every 15.75 years.  Whilst the aim is to inspect 4 cemeteries, the current
budget allocation and resources available only facilitate an inspection of 2 cemeteries
per year.  On that basis a scheduled inspection frequency is more aligned to each
headstone being inspected at least once every 31.5 years. 
The table provides an indicative timeframe for completing the initial inspection of all
cemeteries. 
Phase Number of Cemeteries
within the Inspection Phase
Indicative years for completing initial
inspection
1 29 Between 2022 and 2037
2 13 Between 2038 and 2045
3 5 Between 2046 and 2049
4 24 Between 2050 and 2062 
It should be noted that the total number of cemeteries (71) in the table add up to more than the total number of
actual cemeteries (63) as some cemeteries have been broken down into different sections, i.e. new and old. 
It should be noted that the indicative timeframes will also be affected by the number of
re-inspections which are necessary.  As more inspections are undertaken, this will
inevitably generate more work demands in terms of headstones which are deemed
safe at the initial inspection, but require reinspection within a certain period due to an
issue which has been identified, i.e. re-inspect within 1 year or 5 years. 
10. Training 
A specific training course has been designed for Moray Council by the Institute of
Cemetery and Crematorium Management (ICCM). All employees engaged on
assessing headstones shall be trained to carry out inspection of memorials. 
Topics covered during the training course include Testing Method, Consistency,
Marking and Record Keeping, manual Handling and Personal Protective Clothing and
Communications. 
Page 37

Page 38

11. Inspection process and making safe 
The inspection process is carried out in the following way. 
• Visual assessment 
• Hand push test (up to 2.5m high)
• Memorials over 2.5m and complex structures (If the visual inspection highlights
any potential problems the area is cordoned off and the Technical Officer made
aware. The opinion of a structural engineer will then be sought). 
The making safe methods include: 
• Laying the headstone flat
• Trenching (burying up to one third in height-preferred option as it doesn’t create
a trip hazard or create an obstacle for grounds maintenance)
• Cordoning off 
If upon inspection an immediate risk of danger is found the Council will take immediate
action to address the issue.  This will normally be by cordoning off the headstone. 
Where remedial action can be delayed, attempts are made to contact the lair holder to
ensure that they meet their legal responsibility to maintain their headstone/memorial. 
If the condition of a headstone/memorial initially deemed as not being an immediate
issue begins to deteriorate, the Council will take remedial action to address the issue
through its making safe methods.  Any future repairs or reinstallations are the
responsibility of the lair holder.     
12. Record Keeping
The results of all cemetery inspections are recorded on site through the ICCM ‘MIST’
(Memorial Inspection Safety Tool) App.  The results of the initial inspection will inform
future inspections so must be as complete as possible. Only essential information is
gathered during the initial inspection.  Records shall be made for every inspection and
documents retained for a period of at least 5 years.
An excel summary report is also stored which details the number of headstones which
have been inspected. 
Page 38

Page 39

13. Communication 
Prior to carrying out a scheduled inspection, regulations require that a burial authority
must notify the public— 
(a) of the date of the inspection, 
(b) that as a result of the inspection, the burial authority will take steps to make safe
any headstone or other memorial that the authority considers to be, or risk being,
not in safe order, 
(c) what those steps may be. 
In order to return to safe order any headstone or other memorial that the authority
considers to be, or risk of being, not in safe order, a burial authority may in particular— 
(a) repair, make secure, reposition or remove a headstone or other memorial, 
(b) alter the surface of a lair, 
(c) remove or reposition railings, slabs or kerbs.  
Notices are erected in the cemetery in advance of the inspections to comply with the
above requirements. 
14. Partnership Working 
The Open Spaces team do not possess the necessary skills and authority to manage
and deal with all the defects or issues that may be found. Therefore, a partnership
approach is needed in the management of headstone stability. 
The Council works proactively with the following suppliers / partners: 
Partner Activity
Archaeologists Provide advice and oversight on headstones/memorials
which have historic significance and on appropriate make
safe method
Consultancy Provide advice on engineering factors and support for the
sourcing of external contractors for specialist lifting
contractors where required
Specialist lifting
contractors
Provide specialist lifting equipment needed for lifting larger
and heavier headstones/memorials
Page 39

Page 40

Historic Environment
Scotland
Provide advice and oversight on headstones/memorials
which have historic significance
Burial Administration
and Technical
support
Assist with work planning and co-ordination with specialist
agencies   
15. Types of memorial 
There is a vast array of different types of headstone/memorials. A list of the different
types is shown in Appendix 2. 
Page 40

Page 41

Appendix 1
Phasing for headstone/memorial inspections 
Phase 1 Inspections  Phase 2 Inspections  Phase 3
Inspections 
Phase 4
Inspections
Aberlour old  Alves Old  Broomhill  Aberlour new
Bellie Old  Boharm  Cullen  Alves new
Birnie Old  Spynie Churchyard  Edinkillie  Bellie New
Burghead Churchyard  Cabrach  Lossie Cem Mid-
section  Birnie New
Burghead Old  Dipple  Rafford  Broomhill New
Clunyhill  Downan    Buckie new
Cullen Old Churchyard  Drumin    Buckie West
Deskford  Dundurcus    Burghead New
Duffus Old  Kinneddar Lossie    Burnside
Dyke old bit  Kirkhill    Clovenside Forres
Elgin North (1970-80's section)  Kirkmichael    Cullen and
Deskford
Elgin South   Rothiemay Old    Duffus New
Elgin East  Grange Old    Dyke new bit
Elgin West      Essil New
Essil Old      Glenrinnes 
Hillhead Old      Grange New
Keith Old      Hillhead New
Kinloss      Lhanbryde New
Knockando      Lossie Cem - top
and bottom
Lhanbryde Old      Mortlach New
Lossie Cem rear section      Rothes New
Mortlach Old      Rothiemay New
Rafford Old      Tomintoul New
Rathven Old      Urquhart New
Rothes Old      
Botriphnie      
Inveravon      
Tomintoul Old      
Urquhart Old      
Page 41

Page 42

Appendix 2 
List of types of headstones/memorials 
Headstone/Memorial
type
Description
Lawn Memorial A headstone and base set onto a foundation. The bottom
joint has
proved the downfall of the Lawn Memorial. Masons have
sometimes been 'sparing' with the cement to allow easy
removal for subsequent inscriptions. lt is also a joint prone
to water
penetration because the container and drainage holes
pass through the joint which is often at ground level.
Ledger A flat slab on the ground, can have a curved, peon or flat
top.
Monolith A single piece memorial set directly into the ground. This
construction relies on the stability of the ground to keep
the headstone upright.
Full Grave Memorial Covers all or a major part of the grave space and have a
single piece foundation, or bearers around the perimeter,
to which the memorial is fixed. This type of memorial
usually has kerbs.
Books & Plaques A book or plaque on rests mounted on a base. These
memorials
often have inadequate rests and few dowels. Rests can be
angle cut or have a tick.
Kerb Set Kerbs sometimes having post or vases incorporated in the
surround of the grave space. lf kerbs are loose they
should be placed within the grave space for safety
Headstone & Kerbs The headstone and kerbs should be doweled or cramped
together. Cover slabs fitting inside the kerbs sometimes
rest on bricks and rely on the kerbs to keep it all together.
Cover slabs on top of the kerbs may not have any means
of keeping them in place or not have any sort of central
support. There may be chippings inside the
grave space, but do not rely on the chip bed or the cover
slab having any strength
Table & Chest
Memorials
A structure built with inscription panels on the sides,
usually with a flat or shaped top.
Crosses & Figures Can be a 'stand-alone' unit, or on a full grave memorial.
When
on stepped bases, all levels should be doweled together.
ln older construction, the lower bases may not be
doweled. A single tapered block is called a 'die'.
Arch & Canopy
Memorial
They are always top heavy. The canopy or arch when
out of level can easily twist and topple. Approach with care
and always have any lean away from where you are
standing.
Page 42

Page 43

Headstone/Memorial
type
Description
Column Columns are easily destabilised and once on the move
little can stop them falling. A broken column is a Victorian
symbol.
Pinnacle This memorial is tapered to a point and has a small bottom
joint for its height and is difficult to handle. Much care is
needed.
Obelisk Usually sits central on the grave and consists of a base(s)
with an inscription block. Square on section, often tapered
with a capping stone. On top of the cap is often an urn or
cross. lf the structure moves out of level then the capping
stone is at risk of sliding off. These caps sometimes weigh
a quarter of a ton or more.
Mausoleum An above ground building or other structure built to contain
coffins. Must be treated as a building and not a memorial
Vault A 'below ground' burial chamber. Coffins are supposed to
be sealed in the grave space, which is usually brick or
concrete lined. lt is not filled in with earth. Look for
deterioration of brickwork at ground level. Occasionally an
entrance is evident at the foot.
Wall Plaques They come in a large variety of sizes. Older ones may
stand on corbels
with a wire or cramp at the top and cement as an
adhesive. When they are outside they can be quite
vulnerable. The wall to which they are attached must be
checked and any sign of the plaque separating from it
corbels or the wall and must be noted
Footstones A piece of stone - usually set at the bottom or foot of the
grave.
Occasionally, in the past, a marker stone was installed
soon after the burial. Later the headstone was erected as
a monolith and the marker stone became the foot stone.
Sometimes kerbs followed as finances became available.
Railings were originally to keep the sheep and goats from
eating the plants in the grave space. The animals were
used to keep the grass down. 
Page 43

Page 44

Appendix 2
INTEGRATED IMPACT ASSESSMENT COVERING 
• EQUALITIES & SOCIO ECONOMIC DUTIES
• HUMAN RIGHTS AND RIGHTS OF THE CHILD 
DATE UPDATES/EXECUTIVE SUMMARY VERSION DETAILS
Insert Date
(e.g.
03/10/2023)
Add brief notes/highlight which section amended
(e.g. first draft of IIA completed and submitted to
SFC 25/10/2023 for consideration; noting that further
work on Stage 2 will be required). 
Insert (ShP) Version Info
(when details have been
agreed) (e.g. 5.0
03/10/2023 11:21 AMcL)   
STAGE 1 - DO I NEED AN INTEGRATED IMPACT ASSESSMENT?   
Name of policy or proposal: Headstone/Memorial Inspection Policy 
Is this a  Mark X  below
New activity, programme or policy? X
Change to an existing activity, programme or policy? 
Budget proposal?   
Duties: tick the boxes you think apply No Maybe                                                                                                                                             Yes
Equalities: Will your proposal have an impact on groups with
protected characteristics? 
Consider the impact of your proposal on people and how they
access your services and information without barriers. 
X  
Socio-economic 
Not every person/family has access to regular income or savings.
Will your proposal have an adverse impact on them 
X 
Does your proposal impact on the human rights of people?  X  
Does your proposal impact on the rights of children and young
people 
X  
Reasoning
Page 44

Page 45

Briefly describe your reasoning for the responses given above: 
There may be a financial impact on a lair owner to undertake repairs to a headstone   
If you have answered “maybe” or “yes” to any of the Stage 1 questions above
then proceed to complete the Stage 2 Integrated Impact Assessment questions
below. 
If you have answered “no” to the Stage 1 questions above then provide the details below
and submit to [email] 
Lead Officer for developing the contract 
Other people involved in the screening (this
may be council staff, partners 
or others i.e. contractor or community) 
Date 
Page 45

Page 46

STAGE 2: INTEGRATED IMPACT ASSESSMENT 
Brief description of the affected service
1. Describe what the service does: 
The Council has 63 cemeteries across Moray.  In accordance with the Burial and Cremation
(Scotland) Act 2016 the Council is mandated to undertake scheduled inspections of
headstones within its burial grounds.  The inspection process is to ensure that reasonable
efforts are made to identify any health and safety issues relating to headstones and that
those people working and visiting a cemetery are safe.
2. Who are your main stakeholders? 
Council staff
Funeral Directors
Memorial Masons
Visitors to a cemetery (for a interment service or visiting a lair) 
3. What changes as a result of the proposals? Is the service reduced or removed? 
The policy outlines the Councils approach to undertaking headstone inspections   
4. How will this affect your customers? 
This policy will ensure that people visiting a cemetery a safe as far as is reasonably
practicable.   
5. Impact on staff providing the service 
Additional staff will be employed to undertake headstone inspections 
6. Please indicate if these apply to any of the protected characteristics
Protected groups Potential impacts and considerations
Race  
Disability  
Carers (for elderly, disabled or
minors) 
Sex 
Pregnancy and maternity (including
breastfeeding) 
Sexual orientation 
Age (include children, young people,
midlife and older people) 
Religion, and or belief 
Gender reassignment 
Inequalities arising from socio-
economic differences
There could be financial impacts for lair owners if they
are required to fund a repair to a headstone. 
Human rights
Page 46

Page 47

List of convention rights Describe, where applicable, if and how
specific rights are engaged  
Article 5: Right to liberty and
security 
Article 6: Right to a fair trial 
Article 8: Right to respect for private
and family life, correspondence and
the home 
Article 10: Freedom of expression 
Article 11: Freedom of assembly
and association 
Article 12: Right to marry 
Article 14: Prohibition of
discrimination (in relation to the
convention rights) 
Article 1 of Protocol 1: Protection of
property 
Article 2 of Protocol 1: Right to
education 
Article 3 of Protocol 1: Right to free
elections by secret ballot 
Children’s Rights and Wellbeing 
Relevant articles – UNCRC 
Article 2 – Non discrimination 
Article 12 – Respect of the views of the
child 
Article 3.1 – Best interest of the child 
Article 6.2 – Right to survival and
development 
7. Evidence. What information have you used to make your assessment? 
Performance data 
Internal
consultation
Discussion with Burial Team
Consultation with
affected groups 
Local statistics 
National statistics 
Other 
8. Evidence gaps 
Do you need additional information in order to complete the information in the previous
questions? 
Page 47

Page 48

No 
9. Mitigating action 
Can the impact of the proposed policy/activity be mitigated?  Please explain 
The impact to funding a repair could be mitigated a family removing a headstone, sinking the
headstone into the ground or placing it flat on the ground. 
10. Justification
If nothing can be done to reduce the negative impact(s) but the proposed policy/activity must
go ahead, what justification is there to continue with the change?   
The lair owner is legally responsible for maintaining the headstone.  The Council has a duty to
undertake headstone inspection and is legally responsible for ensuring that a cemetery is a
safe place to visit and work.   
Page 48

Page 49

SECTION 3 CONCLUDING THE IIA 
Concluding the IIA 
1. No potential negative impacts on any of the protected groups were
found. 
2. Some potential negative impacts have been identified.
The impacts relate to: socio economic
X
Reducing discrimination, harassment, victimisation or other conduct
prohibited under the Equality Act 2010 
Promoting equality of opportunity 
Fostering good relations 
3. The proposals interfere with human rights and/or the rights of the
child 
4. Negative impacts can be mitigated the proposals as outlined in
question 9. 
5. The negative impacts cannot be fully mitigated but are justified as
outlined in question 10. 
X
6. Further consultation with affected groups is needed. 
7. It is advised not to go ahead with the proposals. 
Decision
Set out the rationale for deciding whether or not to proceed with the proposed actions: 
There is a regulatory requirement to undertake the inspection of headstones with cemetery. 
Date of Decision: XXXX 
Page 49

Page 50

Sign off and authorisation: 
Service Environmental Services
Department  Operations and Environment
Policy/activity subject to IIA Headstone/Memorialisation Inspection Policy
We have completed the integrated impact
assessment for this policy/activity. 
Name: Paul Wolverson
Position: Service Manager Environmental
services
Date: 18/02/26
Authorisation by head of service  Name: 
Position: 
Date:
Permission to publish on website - 
Please return this form to the Equal Opportunities Officer, Chief Executive’s Office. 
Page 50

Page 51

Report to: Economic Development
and Infrastructure
Services Committee 
Meeting Date: 10 March 2026  
Report by: Executive Director Economy, Enterprise and Operations 
Author: Kim McGowan Contact Email: Kim.mcgowan@moray.gov.uk 
Subject: Non Network Bridge Prioritisation 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to seek approval of the proposed Council Policy relating to
prioritisation of non-network bridge maintenance works.  
1.2  This report is submitted to Committee in terms of Section III (F) (15) of the Council's
Scheme of Administration relating to management and implementation of the
requirements of the Roads (Scotland) Act 1984.  
2.  SUMMARY  
2.1  Moray Council is responsible for the maintenance of 120 non-network bridges. Significant
maintenance works are currently prioritised based on condition and strategic importance. 
The proposed policy formalises this approach, which prioritises capital investment where
it is needed most. 
3.  RECOMMENDATIONS 
3.1  It is recommended that Committee agree to endorse the proposed Council Policy as
set out in paragraphs 4.1-4.7 in relation to prioritisation of Non-Network Bridge
maintenance works   
Kim McGowan
Senior Engineer 
4.  BACKGROUND AND CONTEXT  
Item 7.
Page 51

Page 52

4.1  Moray Council’s non-network bridge stock currently consists of 120 bridges. Non-network
bridges are those which carry active travel routes and paths rather than the adopted road
network. There is also a small amount of vehicle access structures that are not on
adopted routes. Significant refurbishment or replacement works are funded through the
Council’s capital budget, with minor maintenance works undertaken using the main
revenue budget for all bridge stock. 
4.2  The condition of the Council’s non-network bridges is monitored through general
inspections every 3 years. This programme of inspections started in 2023 and we now have
condition data on all of the non network bridges, which will be used in the prioritisation
method that has been developed.  Each bridge is scored on its general condition and on
the condition of its critical elements. This score in combination with the strategic
importance of the bridge is used to prioritise significant maintenance or refurbishment
works. 
4.3  A prioritisation scheme is required to help formalise the current system that is in place
regarding the prioritisation of capital funded maintenance, repair, strengthening and
renewal (“works”) for the non-network bridges that are under Moray Council’s ownership.
This system will ensure that the available capital funding is used in the most effective
manner relating to these structures.   
4.4  The prioritisation procedure will apply to all Moray Council owned non-network structures
and is inclusive of all different forms of construction. The prioritisation of bridges will be
based on “Network Criticality” and “Bridge Condition Score”.   The proposed prioritisation
method for non-network bridges is very similar to that used for network bridges, which was
agreed at a meeting of this committee on 2 May 2023 (paragraph 12 of the minute refers). 
4.5  Network Criticality will be split into three categories, High, Medium and Low. No
subcategories have been used. Bridges will be classed as High priority if they carry the
Speyside Way, Moray Coast Trail, a National Cycle Network, or are popular town centre
routes with long diversions. Bridges will be classed as Medium priority if they carry routes
in town centres with short diversion routes, or popular rural routes with no alternatives.
Bridges will be classed as Low priority if they are on low volume usage rural routes, or now
redundant routes. 
4.6  The Bridge Condition scores are rated 1-5 and follow the Structure Condition Index table
below: 
Very Good scores 1, Good scores 2, Fair scores 3, Poor scores 4 and Very Poor scores 5.
Similarly for network criticality, High scores a 3, Medium a 2 and Low a 1. 
There scores will be multiplied together to give an overall Priority Score for each bridge. 
4.7  The non-network bridge prioritisation will be maintained periodically and the rankings can
be expected to change over time as the above factors change. It is suggested that the
Page 52

Page 53

prioritisation should be reviewed on an annual basis taking account of the latest available
information. For example, Bridge Condition Score will change with time as bridge
condition deteriorates with asset age (typically as detected and updated by the routine,
cyclical inspection programme.  The current prioritisation list is provided in Appendix A. 
5.  PROPOSALS  
5.1  Based on the information provided in Section 4 of this report, the proposed policy for
members consideration is provided below. 
• All non-network bridges in Moray will be prioritised based on a combination of
Network Criticality and Bridge Condition Score.
• The non-network bridge prioritisation will be reviewed annually to allow for changes
that occur throughout the year.
• Proposed expenditure will follow the order of prioritisation.  
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  x
Policy and Legal  X
Financial  
Risk  X
Staffing  X
Best Value and Transformation  
Property  
Information Communications Technology/Digital  X
Equalities. Social Inclusion and Economic Impact   
Climate Change and Biodiversity Impact  
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
Page 53

Page 54

☐ Empowering and connecting communities.
☐ Improving wellbeing of our population 
6.3  Policy and Legal 
There are no policy and legal implications associated with this report.  
6.4  Financial 
There are no direct financial implications from this policy, however it will assist with the
allocation of finite financial resources. 
6.5  Risk 
Due to reducing capital allocation, the number of non network bridges that can be
refurbished or replaced is reduced.  Over time this is likely to result in an increasing
number of bridge closures. .  
6.6  Staffing 
There is no change to staffing levels due to the recommendation in this report.  
6.7  Best Value and Transformation 
Best value in terms of choosing the highest priority structures for repair.  
6.8  Property 
120 non-network bridges in Moray currently vest with Moray Council. 
6.9  Information Communications/Technology/Digital 
There is no ICT/digital involved in the recommendations of this report.  
6.10  Equalities, Social Inclusion and Economic Impact 
The non-network bridges provide walking and cycling routes throughout Moray which
affects social inclusion. An IIA is presented at APPENDIX B that highlights impacts,
considerations and mitigation for equalities and socio economic duties as well as human
rights and rights of the child.  
6.11  Climate Change and Biodiversity Impacts 
Where possible we would seek to recycle and/or reuse the waste material generated
through demolition of existing bridges. 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with Executive Director Economy, Enterprise
and Operations, Head of Operations and Environment, Chief Financial Officer, Service
Manager Legal Services, Service Manager, People Management, Equal Opportunities
Officer, and L Rowan, Committee Services Officer and any comments made have been
incorporated into the report.   
8.  BACKGROUND PAPERS  
8.1  None.  
Page 54

Page 55

Appendix A
Appendix 
NON NETWORK BRIDGE PRIORITISATION Dec-25                  
Code Name Criticality
NC
weighting BCI Avg BCI Crit Alert Status
Priority
Score
NN036 BELOW ABERLOUR HOUSE HIGH 3 76.53072 9.72 5 15
NN037 BETWEEN DOWANS BRAE AND KINERMONY HOUSE HIGH 3 71.4 22.12 5 15
NN105 GARMOUTH VIADUCT HIGH 3 65.62273 28.08 5 15
NN146 NORTH OF COLLIES GARAGE HIGH 3 64 28.08 5 15
NN078 DAILUAINE HALT BRIDGE HIGH 3 69 31 5 15
NN187 SANQUHAR LOCH UPPER APPROACH SPAN SOUTH High 3 71 31 5 15
NN066 CRAGGANMORE RAILWAY HIGH 3 83.0162 39.52 5 15
NN161 OVER BURN AT DALVENUAN HIGH 3 88.17993 39.52 5 15
NN162 OVER TRACK AT DALVENUAN HIGH 3 91.19476 39.52 5 15
NN085 DELRIACH High 3 59.38923 28.08 5 15
NN167 RIVER FIDDICH BRIDGE High 3 59.91093 39.52 5 15
NN034 BALLINDALLOCH VIADUCT HIGH 3 65.23952 41.45846 4 12
NN163 PITCHROY 1 HIGH 3 77.54683 50.32 4 12
NN106 GAULDWELL CULVERT High 3 75 55.45 4 12
NN062 CARRON HOUSE OVERBRIDGE HIGH 3 76.5191 55.48 4 12
NN053 BURN OF TYNET High 3 77.75134 55.48 4 12
NN112 GLENAVON HIGH 3 75.1 55.48 4 12
NN003 MILLHAUGH HIGH 3 86.13236 55.48 4 12
NN104 GARMOUTH TO SPEY BAY RAILWAY BRIDGE B HIGH 3 80.353 55.48 4 12
NN122 HOPEMAN TO BURGHEAD OLD RAILWAY 3 High 3 84.3088 55.48 4 12
NN070 CREEPIE HIGH 3 88.13934 58 4 12
NN181 WILSONS LAND BRIDGE High 3 71.12819 65.32 4 12
NN088 DUFFTOWN SPUR BR 3 (NEWTON) high 3 64.49725 53.76 4 12
NN055 BURNSIDE CEMETERY BRIDGE 1 Medium 2 60.85275 9.72 5 10
NN050 BUCKPOOL RAILWAY FOOTBRIDGE Medium 2 45.09409 9.720006 5 10
NN145 MOSSET BURN BRIDGE SOUTH Medium 2 57.52888 22.12 5 10
NN134 MILLBUIES COUNTRY ESTATE BR 2 Medium 2 70.88765 39.52 5 10
NN133 MILLBUIES COUNTRY ESTATE BR 1 Medium 2 75.09953 39.52 5 10
NN001 BELOW KNOCKANDO HOUSE HIGH 3 80.88 65.32 3 9
NN091 EAST OF KINERMONY OVERBRIDGE HIGH 3 76.7 65.32 3 9
NN002 MILLHAUGH BURN HIGH 3 84.7 65.32 3 9
NN177 UPSTREAM OF KNOCKANDO FISHING HUT HIGH 3 94.65498 65.32 3 9
NN061 CALLY BRIDGE HIGH 3 88.83855 71.07999 3 9
NN024 ALLACHOY High 3 76.38435 78.88 3 9
NN171 TAMDHU DISTILLERY HIGH 3 82.54079 78.88 3 9
NN164 PITCHROY SUSPENSION BRIDGE HIGH 3 89.05137 78.88 3 9
NN170 TAM AN URIE TUNNEL HIGH 3 81.58607 78.88 3 9
NN123 HOPEMAN TO BURGHEAD OLD RAILWAY 4 High 3 90.95832 78.88 3 9
NN087 DUFFTOWN SPUR BR 2 High 3 64.98289 74.52 3 9
NN044 BUCHROMB CULVERT HIGH 3 88.37215 74.52 3 9
NN045 BUCHROMB WOOD CULVERT 1 Low 3 66.61902 78.88 3 9
NN142 MORRISTON BRIDGE Medium 2 62.75477 50.32 4 8
Page 55

Page 56

NN098 FOGWATT LAYBY TO MILLBUIES BRIDGE Medium 2 69.01211 50.32 4 8
NN068 CRANNOCH PATH BRIDGE 1 Medium 2 74.0834 55.48 4 8
NN071 CRUATS FARM BRIDGE High 3 83 55.48 4 12
NN185 Lossie East Beach Medium 2 90.84834 68.3032 3 6
NN033 BAIRNS BRIDGE Medium 2 91.85939 76.72713 3 6
NN052 BURN OF RATHVEN BRIDGE Medium 2 84.38579 78.87999 3 6
NN179 VICTORIA FOOTBRIDGE Medium 2 70.16431 78.88 3 6
NN126 KINERMONY OVERBRIDGE HIGH 3 85 78.88 2 6
NN151 OLD BREWERY BRIDGE medium 2 82.5 78.88 3 6
NN169 TAM AN URIE BRIDGE HIGH 3 75.27362 81 2 6
NN174 THE STRYPE FORMER RAILWAY BRIDGE - ALICE LITTLER PARK HIGH 3 75.79401 81 2 6
NN004 ABERLOUR BURN HIGH 3 80.7653 81 2 6
NN082 DELAGYLE HIGH 3 97.8 81 2 6
NN038 BETWEEN US KNOCKANDO FISH HUT & OPP KNOCK FISH HUT HIGH 3 96.90051 81 2 6
NN096 FINDOCHTY CARAVAN BRIDGE high 3 92.75732 81 2 6
NN035 BARMUCKITY CYCLEWAY BRIDGE High 3 93.20629 81 2 6
NN047 BUCHROMB WOOD CULVERT 3 Low 3 68.39944 81 2 6
NN069 CRANNOCH PATH BRIDGE 2 Low 1 68.79797 0 5 5
NN040 BRANDY BRIDGE KEITH LOW 1 54 0 5 5
NN097 FINDOCHTY CASTLE LOW 1 75.85 0 5 5
NN154 OLD DOWNAN BRIDGE LOW 1 54.8029 9.720006 5 5
NN144 MOSSET BURN BRIDGE NORTH LOW 1 64.53452 22.12 5 5
NN152 OLD BRIDGE OF AVON LOW 1 79.22716 25.1 5 5
NN172 TELFORD BRIDGE LOW 1 60.68628 28.08 5 5
NN100 FORRES ACADEMY BRIDGE Medium 1 52.50922 39.52 5 5
NN000 CALLY OVERBRIDGE LOW 1 67.45522 39.52 5 5
NN143 MORTLACH CEMETERY BRIDGE LOW 1 79.2 44.5 4 4
NN039 BRAEHEAD BRIDGE KEITH LOW 1 47.87027 50.32 4 4
NN148 NORTH OF DELNAPOT LOW 1 71.65439 50.32 4 4
NN125 HOPEMAN TO BURGHEAD OLD RAILWAY 6 LOW 1 77.15398 50.32 4 4
NN084 DELNAPOT OVERBRIDGE LOW 1 68.25755 55.48 4 4
NN138 MILLBUIES COUNTRY PARK BR 4 LOW 1 83.37545 55.48 4 4
NN130 MARYPARK PLAY AREA BRIDGE LOW 1 83.56134 55.48 4 4
NN099 FORMER RAILWAY BRIDGE, ALICE LITTLER PARK LOW 1 80 55.48 4 4
NN173 TELFORD FLOOD SPAN LOW 1 75.14499 55.48 4 4
NN141 MILLBUIES COUNTRY PARK DB 3 medium 2 80.26492 81 2 4
NN136 MILLBUIES COUNTRY PARK BR 1B Medium 2 81.76244 81 2 4
NN139 MILLBUIES COUNTRY PARK DB 1 Medium 2 86.38957 81 2 4
NN051 BURDSHAUGH BRIDGE Medium 2 92 81 2 4
NN140 MILLBUIES COUNTRY PARK DB 2 Medium 2 90.14524 81 2 4
NN072 CULLEN BURN FOOTBRIDGE Medium 2 92.66758 81 2 4
NN049 BUCKIE BURN PICNIC SITE BRIDGE 2 LOW 1 57.79748 65.32 3 3
NN048 BUCKIE BURN PICNIC SITE BRIDGE 1 LOW 1 71.24323 74.52 3 3
NN131 MARYWELL FOOTBRIDGE LOW 1 74.79385 78.88 3 3
NN157 OLD TOM M'OR BRIDGE LOW 1 85 78.88 3 3
NN158 OLD TOM M'OR D/S EXT LOW 1 86.37154 78.88 3 3
NN042 BROOM OF MOY FLOOD SPAN HIGH 3 96.64449 90.5 1 3
NN121 HOPEMAN TO BURGHEAD OLD RAILWAY 2 HIGH 3 93.1928 99.99999 1 3
Page 56

Page 57

NN160 OPP KNOCKANDO FISHING HUT HIGH 3 98.00682 100 1 3
NN132 MIDWAY DELAGYLE AND BIO PLANT HIGH 3 97.4 100 1 3
NN028 AYEON BURN HIGH 3 100 100 1 3
NN103 GARMOUTH TO SPEYBAY  RAILWAY BRIDGE A HIGH 3 92.90154 100 1 3
NN149
NORTH OF UPSTREAM OF KNOCKANDO FISHING HUT AND OPP KNOCKANDO FISH
HUT HIGH 3 100 100 1 3
NN086 DUFFTOWN SPUR BR 1 HIGH 3 93.24459 100 1 3
NN124 HOPEMAN TO BURGHEAD OLD RAILWAY 5 LOW 1 92.12048 81 2 2
NN168 ROTHIEMAY PLAYING FIELD BRIDGE LOW 1 76 81 2 2
NN186 Chapleton Dam Footbridge LOW 1 92.77 83.31 2 2
NN081 DEANSHAUGH FOOTBRIDGE Medium 2 84.45345 93.66666 1 2
NN159 OLDMILLS CYCLEWAY BRIDGE Medium 2 93.68059 100 1 2
NN137 MILLBUIES COUNTRY PARK BR 3 Medium 2 95.47607 100 1 2
NN155 OLD GLENBURNIE LOW 1 93.71878 92.26438 1 1
NN165 RAILWAY TRACK CULVERT LOW 1 92.32819 99.99999 1 1
NN064 COTTAGE WOOD BRIDGE 1 LOW 1 77.93527 100 1 1
NN135 MILLBUIES COUNTRY PARK BR 1A Medium 1 78.51405 100 1 1
NN065 COTTAGE WOOD BRIDGE 2 LOW 1 82.85482 100 1 1
NN118 HIGHLAND DISTILLERY BRIDGE 1 LOW 1 93.65621 100 1 1
NN137 Linkwood Footbridge LOW 1 95.71 100 1 1
NN129 LOSSIE WYND FOOTBRIDGE LOW 1 96.89046 100 1 1
NN102 Forres Duckpond South LOW 1 99.21112 100 1 1
NN056 BURNSIDE CEMETERY BRIDGE 2 LOW 1 100 100 1 1
NN101 Forres Duckpond North LOW 1 100 100 1 1
NN115 GREEN STREET PLAY PARK BRIDGE LOW 1 100 100 1 1
NN077 CULVERT TO WEST OF MILLHAUGH BURN LOW 1 100 100 1 1
NN120 HOPEMAN TO BURGHEAD OLD RAILWAY 1 LOW 1 100 100 1 1
NN057 BY IMPERIAL COTTAGES HIGH 3     5 0
NN058 BY LOBINS POOL HIGH 3     5 0
NN083 DELMORE HIGH 3     5 0
NN054 BURNMOUTH COTTAGE BRIDGE HIGH 3     5 0
NN063 CEMETARY ROAD ACCESS BRIDGE Medium 2     5 0
NN116 GRUGGLE WOOD HIGH 3     5 0
Page 57

Page 58

Appendix B
INTEGRATED IMPACT ASSESSMENT COVERING 
• EQUALITIES & SOCIO ECONOMIC DUTIES
• HUMAN RIGHTS AND RIGHTS OF THE CHILD 
DATE UPDATES/EXECUTIVE SUMMARY VERSION DETAILS
Admin Use Only 
e.g. Stage 1 of IIA submitted to SFC 25/10/23, subject to
consultation.  Findings of consultation added to Section
7 Evidence, Section 8 Evidence Gaps and Section 10
Justification.  
Insert (ShP) Version Info (when
details have been agreed) (e.g.
5.0 03/10/2023 11:21 AMcL)
19.02.2026 First draft of IIA completed to be submitted to ED&I
Committee on 10/03/2026 for consideration. 
STAGE 1 - DO I NEED AN INTEGRATED IMPACT ASSESSMENT?  
Name of policy or proposal: 
Moray Council – Non-Network Bridge Prioritisation Policy
Is this a  Mark X  below
New activity, programme or policy? 
Change to an existing activity, programme or policy? ✓
Budget proposal? 
Duties: tick the boxes you think apply No Maybe                                                                                                                                             Yes
Equalities: Will your proposal have an impact on groups with
protected characteristics?  Consider the impact of your proposal
on people and how they access your services and information
without barriers. 
✓ 
Socio-economic 
Not every person/family has access to regular income or savings.
Will your proposal have an adverse impact on them 
✓ 
Does your proposal impact on the human rights of people?   ✓ 
Does your proposal impact on the rights of children and young
people  
✓  
Reasoning
Briefly describe your reasoning for the responses given above: 
The policy prioritisation is based on bridge condition and network criticality.  While this
ensures consistency and value for money, it may unintentionally disadvantage groups who
rely more heavily on active travel routes, including disabled people, older residents, children
and socio-economically disadvantaged communities. A Stage 2 IIA has therefore been
completed to identify and assess any potential impacts and mitigations if required. 
If you have answered “maybe” or “yes” to any of the Stage 1 questions above then
proceed to complete the Stage 2 Integrated Impact Assessment questions below.
If you have answered “no” to the Stage 1 questions above then provide the details below
and submit to [email]
Lead Officer for developing the contract Kim McGowan – policy rather than a specific
contract.
Page 58

Page 59

Other people involved in the screening (this
may be council staff, partners 
or others i.e. contractor or community)
Debbie Halliday – Design Consultancy
Manager
Date 20/02/2026 
STAGE 2: INTEGRATED IMPACT ASSESSMENT 
1. Brief description of the affected service
Moray Council’s non-network bridge stock currently consists of 120 bridges. Non-network
bridges are those which carry active travel routes and paths rather than the adopted road
network. There is also a small amount of vehicle access structures that are not on adopted
routes. Refurbishment or replacement works are funded through the Council’s capital
budget, with minor maintenance works undertaken using the main revenue budget for all
bridge stock, monitored through general inspections every 3 years. Each bridge is scored on
its general condition and on the condition of its critical elements. This score in combination
with the strategic importance of the bridge is used to prioritise significant maintenance or
refurbishment works.
2. Who are your main stakeholders? 
Population / communities living near the bridges.
People who use the bridges for travel, access routes.
3. What changes as a result of the proposals? Is the service reduced or removed?
A proposed prioritisation scheme is required to help formalise the current system in relation
to capital funded maintenance, repair, strengthening and renewal (“works”) for the Council
owned non-network bridges.  The aim is to ensure that the available capital funding is used
effectively. The prioritisation of bridges will be based on “Network Criticality” and “Bridge
Condition Score”, similar to network bridges (agreed 2 May 2023) but also includes a high,
medium, low rating based on town centre vicinity, popularity and diversion lengths.
More details on the prioritisation method is available in S.4 of the committee report.  The
prioritisation will be reviewed annually.   
4. How will this affect your customers?
Certain bridges will be prioritised for repair.  Some may be closed during period of repair /
maintenance, some may need to close permanently if not prioritised or funding is not
available for repair. 
5. Impact on staff providing the service
No impact. 
6. Please indicate if these apply to any of the protected characteristics
Protected groups Potential impacts and considerations
Race  
Disability  Potential negative impact – those with physical
disabilities, mobility impairments, visual
impairments or sensory impairments may be
disproportionately affected in terms of accessibility
by bridge closures, surface deterioration, narrow
access points, long diversion routes
Carers (for elderly, disabled or
minors)
Potential negative impact – as above if carers/family
support their ability to get to places. 
Sex Potential negative Impact – more women statistically
have caring responsibilities, walking routes linked to
Page 59

Page 60

school, etc. Personal safety could also be
compromised if routes not available.
Pregnancy and maternity (including
breastfeeding) 
Sexual orientation 
Age (include children, young people,
midlife and older people)
Potential negative impact:
Older people - may rely on safe walking routes for
mobility, independence and inclusion.
Children – may depend on safe walking routes for
school and / or recreation
Religion, and or belief 
Gender reassignment 
Inequalities arising from socio-
economic differences
Potential negative Impact – Some communities,
particularly rural or low-income groups without
access to private vehicles, could experience
reduced route accessibility where structures fall
lower on the prioritisation list.  Bridge closures or
deterioration could disproportionately affect low-
income individuals / households who do not have
access to private vehicles. 
Human rights
List of convention rights Describe, where applicable, if and how
specific rights are engaged
Article 2: Right to Life Structurally safe bridges reduces risks and
supports this right.
Article 5: Right to liberty and security 
Article 6: Right to a fair trial 
Article 8: Right to respect for private and
family life, correspondence and the home
Maintaining active travel routes supports this
right - family life, community cohesion and
inclusion. 
Article 10: Freedom of expression Those affected by the changes have a right to be
consulted and their views heard
Article 11: Freedom of assembly and
association 
Article 12: Right to marry 
Article 14: Prohibition of discrimination
(in relation to the convention rights)
The prioritisation framework applies objective,
transparent criteria, reducing risk.
Article 1 of Protocol 1: Protection of
property 
Article 2 of Protocol 1: Right to education 
Article 3 of Protocol 1: Right to free
elections by secret ballot 
Children’s Rights and Wellbeing 
Relevant articles – UNCRC 
Article 2 – Non discrimination 
Article 3 – Best interests of the child Supports this right - Safer active travel routes
protect children’s welfare.
Page 60

Page 61

Article 6 – Right to life, survival and
development
Supports this right - Safe infrastructure
supports physical activity and development.
Article 12 – Respect of the views of the child 
Article 15 – Freedom of Association Supports this right - Children require safe
routes to access peers, schools and
recreation. 
7. Evidence. What information have you used to make your assessment? 
Performance data Engineering judgement has been used to assess criticality with
all Speyside Way, WalkWheelCycle and Moray Coast Trails
receiving a criticality of High automatically. 
Internal consultation Internal with Design Consultancy only.
Consultation with
affected groups
None at this time.
Local statistics Not available.
National statistics Not available.
Other 
8. Evidence gaps
Do you need additional information in order to complete the information in the previous
questions?
Don’t believe it is necessary at this time. 
9. Mitigating action 
Can the impact of the proposed policy/activity be mitigated?  Please explain 
The following mitigations would reduce any impact:
• Active travel routes are prioritised
• Annual review, particularly of lower-priority rural bridges, allows reprioritisation where
condition worsens
• Ensure accessibility considerations, are embedded in inspection and design
standards to mitigate not being captured in the scoring
• Publish prioritisation methodology to maintain transparency and keep communities
informed 
10. Justification
If nothing can be done to reduce the negative impact(s) but the proposed policy/activity
must go ahead, what justification is there to continue with the change?  
The policy seems to represent a proportionate, equitable, evidence-based mechanism for
allocating limited capital resources while supporting individual rights, safety, accessibility
and economic resilience. 
SECTION 3 CONCLUDING THE IIA
1. No potential negative impacts on any of the protected groups were found. 
2. Some potential negative impacts have been identified.
The impacts relate: 
Page 61

Page 62

Reducing discrimination, harassment, victimisation or other conduct prohibited
under the Equality Act 2010
✓
Promoting equality of opportunity ✓
Fostering good relations ✓
3. The proposals interfere with human rights and/or the rights of the child 
4. Negative impacts can be mitigated as outlined in Q9. ✓
5. The negative impacts cannot be fully mitigated or justified as Q10. 
6. Further consultation with affected groups is needed. 
7. It is advised not to go ahead with the proposals. 
Decision - Set out the rationale for deciding whether or not to proceed with the
proposed actions:
A full report and IIA will be presented to ED&I Committee on 10th March 2026 for an informed
decision on how to progress with the proposal.   
The IIA will continue as an evolving document throughout the course of the decision-making
process, and updated with any consultation data, until such point as a final decision is made
by Moray Council on this proposal.   
Date of Decision: 
Sign off and authorisation: 
Service Operations and Environment
Department Design Consultancy
Policy/activity subject to IIA Non-Network Bridge Prioritisation
We have completed the integrated impact
assessment for this policy/activity. 
Name: Kim McGowan
Position: Senior Engineer
Date: 20/02/2026
Authorisation by head of service  Name: Nicola Moss
Position: Head of Operations and Environment
Date: 20/02/2026
Permission to publish on website – Yes 
Please return this form to the Equal Opportunities Officer, Chief Executive’s Office. 
Page 62

Page 63

Report to: Economic Development
and Infrastructure
Services Committee 
Meeting Date: 10 March 2026  
Report by: Executive Director Economy, Enterprise and Operations      
Author: Mark Atherton Contact Email: mark.atherton@moray.gov.uk 
Subject: Roads Maintenance Revenue and Capital Budgets 2026/27 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to approve plans for the expenditure of funds allocated from
the 2026/27 Revenue and Capital Budgets for Roads Maintenance.  
1.2  This report is submitted to Committee in terms of Section III (A) (2) and (F) (16) of the
Council’s Scheme of Administration relating to the consideration of Capital and Revenue
Budgets and exercising the functions of the Council as Roads Authority.  
2.  SUMMARY  
2.1  This report highlights the allocation of proposed revenue and capital allocation to the
various maintenance headings and asset types for 2026/27 and reports the expected
outturn position for the Revenue and Capital Budgets within Roads Maintenance for
2025/26.  
3.  RECOMMENDATIONS  
3.1  It is recommended that Committee:   
i)  approve the allocation of funds, from the Revenue and Capital Budget
2026/27, to Roads Maintenance activities, as outlined in Appendix A of this
report;   
ii)  grant delegated authority to the Service Manager Roads and Fleet to proceed
with necessary roads maintenance works whilst noting that the Service
Manager will, as soon as possible, publish a list of schemes which can be
funded from the budget provision recommended in this report; and   
Item 8.
Page 63

Page 64

iii)  note that the list of schemes will be drawn up in accordance with the
principles and objectives detailed in this report, in the Roads Asset
Management Plan and in the Capital Plan.   
Mark Atherton
Service Manager Roads and Fleet 
4.  BACKGROUND AND CONTEXT  
4.1  The Roads (Scotland) Act 1984 places the statutory responsibility for local roads
improvement, maintenance and repair with Local Authorities.  
4.2  Local Authorities are recommended to adopt the principles of the Well Managed Highway
Infrastructure: A Code of Practice and to adapt these as necessary based on consideration
of local circumstances and apply them consistently.  
4.3  The road network represents the Council’s single largest asset (with a gross replacement
cost of almost £1.7 Bn ) and therefore regular and adequate maintenance is vital to ensure
it does not deteriorate materially or become dangerous, and that considerable past
investment is not lost. There is also an increasing understanding of the serious
consequences of failure to invest adequately and effectively in maintaining the local road
network, in particular the progressive deterioration of safety, reliability, and quality,
eventually requiring even greater levels of investment in the future.  
4.4   As stated in the Capital Strategy 2024/25 report to Moray Council 4 December 2024, it is
the Council’s aim to be at the midpoint of the table for road conditions in Scotland (para
12 of the minute refers). .  This reduction in standard, from the council’s current position of
5th, will result in additional budget pressures in future years, as it will cost significantly
more to maintain a steady state road condition on a deteriorated network.  
4.5  The final list of schemes will be compiled utilising the agreed Roads Asset Management
Planning process.  Officers will consider maintenance options over a longer term to plan
for the most appropriate treatment at the most appropriate time rather than automatically
fixing the roads which look worst.  
4.6  An idea of the extent of the road network and associated assets maintained by Roads
Maintenance can be gauged from Table 1 below:-   
Table 1 – Roads Asset Inventory (as at 20/01/26)
(a) LENGTHS    
A Class roads 157.3 km  
B Class roads 296.3 km  
C Class roads 365.5 km  
Unclassified roads 744.8 km        
Total road length 1,563.9 km        
Footways, footpaths & cycle tracks 57.7 km
Page 64

Page 65

(b) INVENTORY (sample)    
Street lights 19,191 no  
Illuminated signs & bollards 1,089 no  
Vehicle restraint systems 31,671 linm  
Road Gullies 19,353 no   
5.  PLANNED WORKS 26/27 – REVENUE & CAPITAL FUNDED  
5.1  The revenue funded activities include routine functions of a reactive or environmental
nature needed to remove hazards to road users, to prevent deterioration to the fabric
of the road and to keep the network clean and attractive. The main activities include
smaller reactive carriageway and footpath patching repairs, cyclic gully cleaning and
grass cutting of roadside verges. The Revenue budget remains similar to last year as
shown in Appendix A.  
5.2  The capital budgets ensure investment within the road, footpath, drainage and street
lighting assets are used to preserve the long term make up of these asset types and
involve adopting an asset management approach using robust data to make informed
decisions.  
5.3  At a meeting of Moray Council on 22 October 2024 (paragraph 9 of the Minute refers)
the mechanism for applying the cap on capital, which has been applied to both core
programme and named project expenditure was approved.  
5.4  The Capital budget allocation to Roads Maintenance has been impacted and reduced
in line with caps applied to the revised Capital Plan following the council approval
referred to above.  
5.5  The core Capital budget allocation, as per the capital plan that was approved at the
meeting of the Moray Council on the 28 January 2026 (para 7 of the draft minute
refers), where Roads Maintenance activities fall within the roads, bridges and lighting
budgets. The allocated funds to roads maintenance will primarily be used to fund
resurfacing works, edge strengthening works and our annual surface dressing
programme. 
5.6  The current Capital budget allocation is significantly outweighed by the number and
value of schemes identified within the reserve list of schemes.  Therefore, as a way of
setting expectations, it should be noted that the council’s ability to repair roads is
limited due to available funding, and while road user safety is of utmost concern and
general maintenance will be carried out in accordance with policy, it is unlikely that
works will be carried out at a rate that road users may expect.  
5.7  The most significant scheme to note that will be undertaken during 2026/27 is the
resurfacing of the A941 at the Mart and Laich Moray Roundabouts in Elgin.  Other
schemes for 2026/27 will be developed in the coming weeks with a detailed
programme being made available to members before 30 April 2026 (as per para 4.5
and 4.6 above).  
Page 65

Page 66

5.8  The capital funded works for 2026/27 include a number of ‘named schemes’ that will
progress as detailed within Appendix A.  The design and construction of these will be
led by the Design Consultancy team.  
5.9  Of these named schemes, the design and repair of Buckie North Street and the design
and repair of B9106 Braes of Enzie are anticipated to happen in 2026/27.  
5.10  Within Street Lighting, the Capital funding will continue to be used to carry out a
column replacement programme with an emphasis placed on replacing design life
expired columns, and priority given to replacing the oldest columns first.  
5.11  There are currently 6,296 (34%) lighting columns in Moray which are beyond their
design life.  
5.12  Appendix A includes a summary of the proposed budget allocation for 2026/27 and
the estimated outturn expenditure for 2025/26. 
6.  2025/26 REVIEW  
6.1 For the general maintenance element of this budget (such as patching, lining, street
lighting repairs), it is tracking to be on or slightly under budget. There will be significant
overspend on winter maintenance.   Moray experienced a notable snow event in
January 2026 that resulted in high expenditure due to all resources, including those
from other services, being deployed to winter activities.    
6.2 Detailed information on the number of winter actions and salt used, including 
comparisons with previous years, is shown in Appendix B. The 2025/26 winter season
(up to end of March) highlights a reduction in the number of route actions in
comparison to the four previous winters, though the number of days with action was
significantly higher. Salt usage is around 500 tonnes less than last year, but still above
both the 5 and 10 year averages. Winter outturn expenditure for 2025/26 is around
£350k less than in 2024/25 but, as already mentioned in 6.1 above, well in excess of 
the allocated budget which is based on a mild winter.  
6.3 Within the capital budget allocation, a full expenditure is predicted at this time.  
6.4 The named capital schemes funded from 25/26 capital allocation have been
completed as planned. This included completion of C1H landslip, A939 landslip
Creag Chalcaidh quarry and works at Main street, Buckie.  
6.5 The operational workforce has 15 full time road worker vacancies, from an
establishment of 70.  These vacancies impact on the service’s ability to deliver all
elements of planned works.  
6.6 The service is actively looking to fill the above vacancies to allow the successful
delivery of the 26/27 works programme, including looking at different advertising
channels such as social media and job fairs to increase awareness of the roles
available.  
Page 66

Page 67

6.7 A summary of progress against our roads maintenance related budgets 2025/26 are
highlighted in Table 2 below.   
Table 2 – Summary of Schemes (Roads Maintenance)
Work Type
Status (at 20/02/26):-
Ongoing Completed Cancelled /
Not Started Total
Resurfacing / Recons. 0 29 1 30
Surface Dressing 0 50 0 50
Footway Works 0 7 4 11
Drainage & Other Works 7 13 12 32
Street Lighting Works 1 22 6 29
Total 8 121 23 152 
6.8 It is proposed that the majority of the schemes that have not been programmed
during 2025/26 will be included within 2026/27 planned works. However these will be
assessed during the programme building exercise and considered along with any
other high priority schemes that have come to the attention of the service over the
year.  
7.  SUMMARY OF IMPLICATIONS  
7.1 The table below shows whether risks and implications apply if the recommendations
are agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  X
Policy and Legal  X
Financial X 
Risk X 
Staffing  X
Best Value and Transformation  X
Property  X
Information Communications Technology/Digital  X
Equalities. Social Inclusion and Economic Impact   X
Climate Change and Biodiversity Impact  X 
Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
Page 67

Page 68

b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population 
7.2 Policy and Legal 
The Council is responsible for the maintenance of 1563km of road network which have
been adopted by the Local Authority in terms of the Roads (Scotland) Act 1984. The Act
places a duty on the Local Authority to maintain the roads, lighting units and structures so
adopted, but does not prescribe the level of maintenance to be delivered.  
The Well Maintained Highway Infrastructure Code of Practice which identifies good
practice and consideration has been taken into consideration.  
7.3 Financial 
A summary of the proposed budget allocation for 2026/27 is detailed within Appendix A. 
7.4 Risk 
Pressure on general maintenance budgets will increase in terms of reactive maintenance
as carriageway conditions deteriorate, as well an increasing asset as new adoptions are
made. There is the risk of a budget pressure in relation to winter maintenance. The current
investment in replacement of street lighting columns is not sufficient to address the
increasing number past their design life.  
7.5 Staffing 
Staffing vacancies impact on the ability to deliver planned works as set out in the report.  
7.6 Best Value and Transformation 
None.  
7.7 Property 
None.  
7.8 Information Communications/Technology/Digital 
None.  
7.9 Equalities, Social Inclusion and Economic Impact 
None.  
7.10 Climate Change and Biodiversity Impacts 
There are no climate change implications as a result of this report. Whilst efforts are made
to be mindful of the carbon implications of roads maintenance there are not yet active
measures in place to reduce the carbon impact, outside sustainable and active travel
which is reported via Transportation. Any trials of alternative products are being led by
research bodies rather than directly by the council. 
8.  CONSULTATION
Page 68

Page 69

8.1 This report has been prepared in consultation with Executive Director Economy, Enterprise
and Operations, Head of Operations and Environment, Chief Financial Officer, Service
Manager Legal Services, Service Manager People Management, Equal Opportunities
Officer, and L Rowan, Committee Services Officer and any comments made have been
incorporated into the report.  
9.  BACKGROUND PAPERS  
9.1 None.  
Page 69

Page 70

Appendix A 
2025/26
end of year
budget *
2025/26
estimated
expenditure
2026/27
allocation
Capital Budget 
Carriageway Resurfacing/Recon./Surface Dressing   £             2,330,000   £               2,330,000  £              2,557,000 
Structural works for timber traffic   £                 -   £                 -  £                 - 
Drainage & Other Works   £                 260,000   £                   260,000  £                  260,000 
Footways, footpaths & steps   £                    50,000   £                      50,000  £                  100,000 
Kerb Edge Replacement   £                    -   £                 -  £                    50,000 
Column Replacement   £                 522,000   £                   522,000  £                  621,000 
Sub-total =>   £             3,162,000   £              3,162,000  £             3,588,000    
Capital Budget - Named Schemes 
B9016 Landslip Repair - Studies   £                    65,000  £                      65,000  £                 - 
B9016 Landslip Repair – Design & Repair  £                 -  £                 -  £                 485,000 
C1H Landslip Repair   £                 375,000  £                   375,000  £                 - 
N. High St., Buckie - Ret. Wall - Ph1    £                 150,000  £                   150,000  £                 - 
N. High St., Buckie - Ret. Wall - Design & Repair  £                 -  £                 -  £                 650,000 
B9008 Glenlivet Landslip - Studies   £                 -  £                 -  £                 - 
Sub-total =>   £                  590,000  £                    590,000  £             1,135,000     
Revenue Budget (Roads Maintenance) 
General Maintenance   £             1,969,087   £                1,969,087  £              2,043,112 
Traffic Works   £                 100,105   £                    100,105        £                  100,105   
Lighting Maintenance   £                 146,500   £                    146,500  £                  146,500 
Sub-total =>   £             2,215,692   £              2,215,692  £              2,289,717         
Revenue Budget (Winter & Emergency) 
Winter Maintenance & Other Emergencies   £             1,823,688   £              2,500,000  £             1,823,688 
Sub-total =>   £             1,823,688   £              2,500,000  £              1,823,688     
Revenue Budget (Electricity) 
Lighting & Signs  £                  535,471  £                   535,471  £                 680,471 
Sub-total =>   £                  535,471  £                    535,471  £                  680,471       
Summary 
Capital Budget Total   £              3,162,000  £               3,162,000  £             3,588,000 
Capital Budget - Named Schemes Total   £                  590,000  £                   590,000  £             1,135,000 
Revenue Budget Total   £              4,574,851  £              5,251,163  £             4,793,876 
Capital and Revenue Total =>   £              8,326,851  £              9,003,163  £              9,516,876    
* slippage and carry forwards figures are included 
Page 70

Page 71

Appendix B  
Page 71

Page 72

Appendix B 
Page 72

Page 73

Report to: Economic Development
and Infrastructure
Services Committee 
Meeting Date: 10 March 2026  
Report by: Executive Director Economy, Enterprise and Operations      
Author: Debbie Halliday Contact
Email: 
Debbie.halliday@moray.gov.uk 
Subject: Flood Risk Management and Bridges Capital and Revenue Budgets 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to approve the proposed 2026/27 Capital and Revenue
programme of work for Flood Risk Management and Bridge Maintenance.  
1.2  This report is submitted to Committee in terms of III (A) (2) of the Council’s Scheme of
Administration relating to the consideration of Capital and Revenue Budgets and long term
financial plans.  
2.  SUMMARY  
2.1  Work has been ongoing throughout 2025/26 to deliver the programme of capital and
revenue works for Flood Risk Management and Bridge Maintenance.  These programmes
of work have largely been completed in line with the proposals agreed by this committee
on 29 April 2025 (para 11 of the minute refers).  However, to address storm damage there
have been some changes to the agreed works, details of which are provided in Section 4 of
this report. 
2.2  The Flood Risk Management programme of work for 2026/27 includes maintenance of the
Council’s flood schemes and works at the Tyock Culvert, Millbuies Reservoir and Rothes
Burn. 
2.3  The Bridge Maintenance programme of work for 2026/27 includes maintenance works to
Garrowood Bridge, Birkenhill Bridge, Whitehilloch Bridge, Bridgend Bridge.  Work will also
be undertaken to replace the failed expansion joint at Craigellachie Bridge, install the new
footbridge at Sanquhar Loch and refurbish Sourden Culvert.  Repair works will also be
undertaken at the suspension bridge over the Aberlour Burn, subject to sufficient funds
being available.
Item 9.
Page 73

Page 74

3.  RECOMMENDATIONS –  
3.1  It is recommended that Committee:   
i)  agree the Flood Risk Management Schedule of Clearance and Repair for
2026/27;   
ii)  agree the programme of Bridge Maintenance works for 2026/27; and   
iii)  agree to delegate authority to the Head of Environmental and Commercial
Services to bid for grant funding that is made available throughout the year.   
Debbie Halliday
Service Manager Design Consultancy 
4.  BACKGROUND AND CONTEXT  
Flood Risk Management
4.1  The Flood Risk Management (Scotland) Act 2009 (the Act) requires the Council to deliver
the Actions within the Local Flood Risk Management Plans for Findhorn, Nairn and
Speyside, and North East Local Plan Districts. 
4.2  The Act places upon the Council a duty to assess relevant bodies of water (other than
canals) in its area, for the purpose of ascertaining whether the condition of any such body
of water gives rise to a risk of flooding. Where a water body gives rise to flood risk and the
Council considers clearance and repair works would substantially reduce that risk, the
Council must prepare a schedule of those works and carry them out. 
4.3  During 2025/26 work has been ongoing to deliver the 2025/26 Clearance and Repair
Schedule. Repair work to the Tyock Culvert was postponed, as funds had to be reallocated
to clear trees from the River Lossie after storm Floris and Storm Amy and to repair a
collapsed manhole in Craigellachie.   Work to the Tyock Culvert will be progressed at the
start of the new financial year.  There was no under or overspend on the Flood Risk
Management Revenue budget for 2025/2026.  
4.4  General maintenance of the Council's flood schemes has continued throughout the year. 
Officers have begun a review of the Craigellachie Burn which will continue into 2026.
Officers have worked with SEPA to obtain grant funding to improve Fish Passage on Rothes
Burn. This work will be undertaken in 2026 and 2027. The team also contributed to the
Flood Resilience Audit, undertaken by Audit Scotland and published the interim flood risk
management reports.  Flood works identified in the Flood Risk Management Plans are
subject to grant funding from Scottish Government.   A significant funding gap due to the
escalating cost of schemes included in Cycle 1 (2016 – 2022) has resulted in no funding
being made available so far for schemes in Cycle 2.  It is now unlikely that any of the
schemes put forward by Moray Council for implementation in Cycle 2 will be progressed. 
These schemes will now be carried forward to Cycle 3 (2028 – 2034). 
Page 74

Page 75

Coastal Adaptation
4.5  Officers have continued to drive Moray Council’s collaboration with the Scottish
Government on coastal adaptation. In 2025, Officers completed real-time monitoring of
the coastline between Lossiemouth and Kingston; developed an online community
platform focused on coastal adaptation; and completed Phase 1 of the award-winning
Lossiemouth Christmas Tree Project. Officers are currently examining the impact of
historical wartime defences on coastal erosion and have undertaken an initial review of
the sea defence at Cullen. 
Bridges 
4.6  Under the Roads Scotland Act 1984, Moray Council has a duty to manage and maintain
the safety of the road network in Moray.  Moray Council’s road network includes 378
bridges and 145 retaining walls. 
4.7  In 2025/2026 the bridges revenue budget funded masonry repairs at Tombreckachie
Bridge in Glenlivet and masonry/scour repairs at Newmill Bridge in Newmill.  Fifteen of the
63 Principal Bridge Inspections undertaken in this year were outsourced along with fifteen
CCTV inspections in confined spaces. An assessment of the structural integrity of Arthur’s
Bridge on the B9103 was undertaken, to inform the future operation of the bridge. The
remaining budget was spent on traffic counts for Lea Bridge in Forres, and various minor
repair works. Temporary traffic lights have been installed at New Craigellachie Bridge to
protect a damaged expansion joint.  These lights have been subject to theft and
vandalism.  The cost of making good this damage was £2,500 at the time of writing this
report.  Any further costs associated with repairing damage to these lights will result in an
overspend on the bridges revenue budget. 
4.8  Capital funded bridge refurbishment schemes at Blackhills Culvert and New Bishopmill
Bridge were completed in 2025/26. There was insufficient budget available to progress
projects on the reserve list.  These projects are Sanquhar footbridge replacement and
design work for Sourden Bridge refurbishment and South Arndilly Bridge refurbishment. 
Moray Council was advised by UK Government that grant funding to replace Cloddach
Bridge would not be made available.   
5.  PROPOSALS   
Flood Risk Management
5.1  The 2026/27 Flood Risk Management Annual Revenue Budget is £261,000. This budget
does not cover asset damage or post-flood repairs; such costs will be treated as budget
pressures if an event occurs. Savings identified in 2024/25 have resulted in a reduction of
£50,000 in this budget with a further reduction of £5,000 to be taken this year.  This saving
was to be offset by undertaking Flood Risk Assessments and Drainage Impact
Assessments for external clients.  This service has been marketed through the Planning
website but to date there has been no demand, so this saving represents a cut, which
means a reduction in preventative actions such as trash screen replacements, flood
modelling and minor repairs to existing assets.    
5.2  The proposed Schedule for Clearance and Repair for 2026/27 is provided in Appendix 1.
The Schedule contains recurrent works, minor reactive works as well as planned projects,
together with routine survey and monitoring works. The Council’s Asset Management
System provides a risk- based approach to identifying potential flooding issues. Reports
Page 75

Page 76

from other sources continue to inform the production of the Schedule. The Schedule will
be published on the Council’s website, subject to agreement by this Committee.  
5.3  The Schedule includes the maintenance of the flood schemes in accordance with their
Operation and Maintenance Manuals. This covers schemes in Aberlour, Rothes, Elgin,
Forres, Dallas, Newmill and Lhanbryde. 
Key projects for the 2026/27 year are listed below. 
• Tyock Burn culvert repair.
• Craigellachie Trash screen Replacement.
• Reservoirs minor maintenance 
5.4  Capital works for 2026/27 will focus on construction of a replacement drawdown facility at
Millbuies Reservoir, which is a requirement under the Reservoirs (Scotland) Act 2011.  The
budget for this work is £150,000. Officers will also undertake grant funded works at Rothes
Fish pass at an estimated cost of £310,000, including risk. 
Bridge Maintenance
5.5  All works for bridge maintenance are prioritised in line with the Bridge Maintenance
Prioritisation Policy, agreed by members at a meeting of this Committee on 2 May 2023
(paragraph 12 of the minute refers).  The prioritisation list is provided in Appendix 2.   
5.6  The bridge maintenance revenue budget for 2026/27 is £197,000. Planned works will be
undertaken at Garrowood Bridge, Birkenhill Bridge, Whitehilloch Bridge, Bridgend Bridge
and Lecht Cattlegrid at a cost of £150,000. A structural assessment will be carried out on
Carron Bridge at an estimated cost of £35,000. £12,000 will be allocated for reactive
works, such as repairs to non-recoverable traffic collision damage. 
5.7  The agreed capital budget for bridge maintenance, after the cap has been applied, is
£403,000. The planned works to South Arndilly have been deferred, as the findings of a
Principal Inspection found it had not deteriorated further since the last inspection in 2021. 
The funding originally planned for works to South Arndilly have been reallocated to replace
the failed expansion joint on New Craigellachie Bridge. Sourden Culvert will be refurbished
and the replacement Sanquhar footbridge will be installed. Repair works to the
suspension bridge carrying the Speyside Way (Aberlour Burn) is on the reserve list and will
be progressed, if sufficient funds are available on completion of the other planned works. 
5.8  Information on the partial collapse of Garmouth Viaduct was subject of a report to Moray
Council on 28 January 2026. (para 11 of the draft minute refers) 
5.9  A Principal Inspection and Structural Assessment have been undertaken on Arthurs Bridge
on the B9013.  The assessment has concluded that current condition of Arthurs Bridge is
still sufficient to withstand vehicle loading of up to 7.5 tonnes.  However, any further
deterioration will require the bridge to be closed in the interest of public safety.  Given the
observed rate of deterioration this is likely to happen within the next two years. 
Grant Funding
5.10  In line with the Consultancy team’s remit to promote Flood Risk Management, Coastal
Protection and Bridge Maintenance, there can be mid-year opportunities to benefit from
grant funding to deliver these priorities. The deadlines often preclude submission of a
report to the service committee. It is requested that delegated authority is granted to the
Page 76

Page 77

Head of Environmental and Commercial Services to approve grant funding applications
where these fit with clear ‘business as usual’ work priorities, and do not require any other
unbudgeted expenditure by the council. 
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  x
Policy and Legal x 
Financial x 
Risk x 
Staffing  x
Best Value and Transformation  x
Property  x
Information Communications Technology/Digital             x
Equalities. Social Inclusion and Economic Impact   x
Climate Change and Biodiversity Impact x 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population 
6.3  Policy and Legal 
The Council has a statutory duty, under the Flood Risk Management (Scotland) Act 2009,
to implement the Actions from the Local Flood Risk Management Plans. The Council can
do works not included in the Plans that will manage flood risk, provided it does not affect
the delivery of those actions in the Plan. 
Bridge maintenance work is undertaken in accordance with the Council’s duty to maintain
a safe road network, under the Roads (Scotland) Act 1984 and in line with the Council’s
Bridge Maintenance Prioritisation Policy.
Page 77

Page 78

6.4  Financial 
The proposed Capital and Revenue works as estimated are contained within the Council’s
budget for 2026/27. 
No allowance has been made in the Flood Risk Management budget for dealing with the
consequence of exceptional rainfall/flood events. If these cannot be absorbed within
current budgets by reducing planned works, they will need to be considered as a budget
pressure, if such events arise. 
6.5  Risk 
Due to reducing capital allocation, the number of bridges that can be refurbished or
replaced is reduced.  Over time this is likely to result in an increasing number of weight
restrictions and bridge closures. It should also be noted that flooding and coastal issues
are unpredictable and the items in the Schedule will be carried out in recognising this
uncertainty.    
6.6  Staffing 
There are no staffing implications associated with the recommendations in this report.  
6.7  Best Value and Transformation 
Best value will be achieved by using the most appropriate procurement routes, such as
framework agreements where best value has been demonstrated.  
6.8  Property  
Property implications associated with the recommendations are set out in Section 5 of
this report.  
6.9  Information Communications/Technology/Digital 
There are no communications/technology/digital implications associated with the
recommendations in this report.  
6.10  Equalities, Social Inclusion and Economic Impact 
There are no equalities, social inclusion or economic implications associated with the
recommendations in this report.  
6.11  Climate Change and Biodiversity Impacts 
During the design and implementation of Flood Risk Management works we aim to
increase biodiversity wherever practicable. 
Where a negative impact on climate change occurs as a result of the work we do we
endeavour to mitigate this where possible.  This includes sourcing materials from a
sustainable source and re-using materials. 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with Executive Director Economy, Enterprise
and Operations, Head of Operations and Environment, Chief Financial Officer, Service
Manager Legal Services, Service Manager People Management, Equal Opportunities
Page 78

Page 79

Officer, and L Rowan, Committee Services Officer and any comments made have been
incorporated into the report.  
8.  BACKGROUND PAPERS  
8.1  None.  
Page 79

Page 80

Appendix 1  
Routine Clearance and Maintenance
Budget
Allocations
Kingston - Monitoring Shingle bank/Lein Burn clearance £5,500.00
Tyock Burn - Inspection and Clearance £13,779.82
Elgin FAS - Operation and Maintenance £35,380.80
Burn of Mosset FAS (Chapelton) Operation and Maintenance £11,704.80
Rothes FAS Operation and Maintenance £5,236.69 
Aberlour FAS Operation and Maintenance £3,000.00
Minor Reactive Works £8,000.00
Grass Cutting  Minor Flood Risk £2,631.30
Annual Maintenance of Telemetry - Lhanbryde, Forres (Mosset), 
Rothes FAS £5,810.00
Lhanbryde FAS Operation and Maintenance £2,398.20
Newmill FAS (Phases 1 & 2) - Operation & Maintenance £5,562.90
Millbuies Reservoir Operation and Maintenance £0.00
Findhorn & Pilmuir FAS Asset Management Operation and
Maintenance £45,372.65
Dallas FAS Operation and Maintenance £2,846.55
Aerial Photography £4,400.00
Community Engagement £500.00
Findhorn - Topographic Survey £10,000.00
SSEN Cabinet Findhorn Pump station £4,702.00
Flood Warning Sign Maintenance £4,200.00
Routine Clearance and Maintenance Total £171,025.71  
Repair Projects
Budget
Allocations
Craigellachie Trash screen Replacement £15,000.00
LO34-Tyock Burn Culvert Repairs £75,000.00
Repair Projects Total £90,000.00  
Revenue Budget Total £261,025.71 
Page 80

Page 81

Moray Council Bridges Prioritisation     
Year:  Q1 2023     
Notes:      
1. Bridges are sorted in order of priority score, highest priority at the top.      
2. If changes are made to the input data the priorities may change and it will be necessary to re-sort.      
3. To be read in conjunction with the Prioritisation Procedure Report (Moray Council, August 2023).     
4. All data on this worksheet is drawn by reference from other sheets and should not be edited in this sheet.  The sheet is password protected and only data
filtering is permitted.   
Bridge Code Bridge Name Bridge Alert Status, BAS Network Criticality, NC Priority
Score
Priority Rank 
(1 = high)
Notes / Comments / Observations
A941/320 ASHGROVE CULVERT Amber Vital 280 1  ... Deemed 40T in source spreadsheet but not recorded on
WDM so not taken into account for prioritisation.  Some
indications of structural distress in 2015 PI report.   ... 
B9011/20 KINLOSS BRIDGE - max 60t Amber Vital 280 1  ... Some indication that this bridge may be rated up to 60
tonnes.  ... 
B9015/30 SOURDEN Red Important 250 3  ... No known assessment.  Steep, sustained fall in BCIcrit
score since 2016.  Structural review recommended.  ... 
B9103/20 ARTHUR'S BRIDGE  Red Important 250 3  ... Monitoring recommended in 2020 Fairhurst Assessment
Report ... 
C15E/10 CARRON BRIDGE Red Important 250 3  ...  ... 
B9022/20/JAC BRIDGE OF ISLA Red Important 250 3  ... Joint bridge with Aberdeenshire Council.  Moray is the
maintainer.  Concrete bridge built c.1930.  Repair scheme
undertaken winter 2009/10.  ... 
B9104/20 NETHER DALLACHY SOUTH Red Important 250 3  ... No known assessment.   ... 
A920/190 KEITHMORE Amber Important 200 8  ...  ... 
A941/70 KING'S FORD Amber Important 200 8  ... No known assessment.  Large single-span concrete arch
with masonry-clad concrete spandrels, enveloping earlier
masonry arch.  ... 
B9008/60 NEVIE CULVERT Amber Important 200 8  ...  ... 
B9016/50 ENZIE Amber Important 200 8  ...  ... 
B9102/60 POOLFLASGAN Amber Important 200 8  ... 2012 assessment by Jacobs concluded bridge capacity of
3 tonnes GVW, limited by shear in the carriageway and
footway beams.   ... 
B9115/40 EAST OF FORKINS Amber Important 200 8  ... No known assessment.  ... 
B9116/20 RIVER ISLA BRIDGE Amber Important 200 8  ...  ... 
B9117/50 BRIDGE OF MILLEGIN Amber Important 200 8  ...  ... 
C37E/10 ORCHARD ROAD BRIDGE Amber Important 200 8  ... No known assessment. ... 
U171E/40 ASHGROVE BRIDGE Amber Important 200 8  ... No known assessment.  ... 
U57H/11 SOUTH ARNDILLY Amber Important 200 8  ...  ... 
U60E/10 Asleisk Amber Important 200 8  ...  ... 
U68E/10 EARNHILL Amber Important 200 8  ...  ... 
Page 81

Page 82

B9115/70/JAC BLAIRMOON Amber Important 200 8 Is in joint ownership with MC and Aberdeenshire Council -
AC are the lead maintenance authority and
approve/disapprove abnormal load movements. Propose
remove from list. ... Joint bridge with Aberdeenshire Council. 
Aberdeenshire is the maintainer.  No recent photos. 
Condition score not available so amended to -999. 
Structural review/contract with Aberdeenshire
recommended to update records.   ... 
B9018/130 LINTMILL 1 Amber Important 200 8 Requires adding to Capital Plan with rest of structures
scoring 200. KM updated based on PI results March 2024
U44H/10 BRIDGE OF DUNNYDUFF - Temporary Bridge Amber Important 200 8 This is a collapsed culvert overspanned by a Mabey
Quickbridge.  BCS score and capacity relate to the original
structure. ...  ... 
U57H/20 BRIDGE OF ARNDILLY Amber Important 200 8 Score dropped after access machine PI from 2022  ...  ... 
B9016/20 TARRYCROYS Amber Important 200 8  ... Appears to be error with HIAMS Bcicrit calculation. Based
on Atkins PI, BCIcrit should be 22.12 (4/D) ... 
U138H/10 BRIDGE OF CANTLY Red Standard - High 150 26 Structural review recommended.  Assessment likely due.   ...
Structural assessment in progress.  ... 
U85H/10 NEWTON Red Standard - High 150 26  ...  ... 
C20H/15 CLASHNOIR C20H-15 Yellow Vital 140 28  ... No known assessment.  ... 
C60H/10 DRUMIN BRIDGE Black Standard - Medium 140 28  ...  ... 
U168E/10 KINLOSS CULVERT Yellow Vital 140 28  ...  ... 
U170E/10 KIRKLAND HILL CULVERT Yellow Vital 140 28  ...  ... 
U171E/50 MOYCROFT Yellow Vital 140 28  ... No known assessment.  ... 
U173E/20 SANQUHAR BRIDGE Yellow Vital 140 28  ... Assessed in 2008 by Halcrow, self-weight capacity only. 
3T weight restriction imposed.  Recommend structural
review and monitoring as minimum.  ... 
A941/210 NEW CRAIGELLACHIE Yellow Vital 140 28 Updated scores after concrete repairs and phase 2 works
brings BCIcrit up to 86 (100,100,58)
U115H/10 TOMBAE Amber Standard - High 120 35  ...  ... 
U128H/20 AILNACK Amber Standard - High 120 35  ...  ... 
U26H/10 ROEHILL Amber Standard - High 120 35  ...  ... 
U57H/30 KILLIEMORE Amber Standard - High 120 35  ...  ... 
U93H/10 BALVENIE GARDENS RAILWAY Amber Standard - High 120 35  ...  ... 
U129E/21 BLACKHILLS CULVERT new Yellow Important 100 40  ...  ... 
B9102/50 UPPER KNOCKANDO Yellow Important 100 40  ...  ... 
U142½/10 WILLOWBANK Yellow Important 100 40  ... Although the BCIcrit is currently very low it is considered,
on review, that the condition of the bridge is not very poor.  
... 
U142½/20 CULACH BURN Yellow Important 100 40  ...  ... 
U57H/10 MacDOWALL Yellow Important 100 40 This bridge has had work since the last PI so the BCICRIT
score should increase to 40 once the 2023 PI report is
complete and signed off.   ... BCIcrit expected to improve
following completion of 2022/23 PI report, reducing BAS
score and bridge priority.  Although the BCIcrit is currently
low it is considered, on review, that the condition of the
bridge is not very poor.   ... 
Page 82

Page 83

B9012/30 UNTHANK CULVERT Yellow Important 100 40  ... BCIcrit score given as -999, denotes erroneous input. 
Condition information not reliable, provisionally high alert
score.  Inspection recommended to improve reliability of
priority score. No known assessment.  ... 
B9102/10 PITCHROY Yellow Important 100 40 2024 PI updated BCI crit taking alert status from Amber to
Yellow.
C12E/10 DOUAL BRIDGE Yellow Important 100 40 Crit score increased as per 2023 PI report (still to be
approved). Removed from first draft capital plan due to
score change. 
A939/220 WESTER FODDERLETTER Yellow Important 100 40  ... No known assessment.  Armco-type culvert, masonry
headwalls.  ... 
A920/180 FIDDICH (AUCHINDOUN ) Yellow Important 100 40  ... WDM records BD21 assessment by Jacobs, 2012.   ... 
A939/170 BRIDGE OF LEACHD Yellow Important 100 40  ...  ... 
A939/210 NEW BRIDGE OF AVON Yellow Important 100 40  ...  ... 
A941/110 ARDLUIE Yellow Important 100 40  ...  ... 
A941/80 BAZAAR MEMORIAL Yellow Important 100 40  ...  ... 
A941/90 BLACK WATER BRIDGE Yellow Important 100 40  ...  ... 
A95/70 BRIDGE OF CLERKSEAT Yellow Important 100 40  ...  ... 
A95/90 MONTGREW 1 Yellow Important 100 40  ...  ... 
B9008/40 BRIDGE OF LIVET ( NEW ) Yellow Important 100 40  ...  ... 
B9008/80 TOMBRECKACHIE Yellow Important 100 40  ...  ... 
B9009/30 CONVALLEYS Yellow Important 100 40  ...  ... 
B9009/40 ALLAMICHIE (LYNEMORE) Yellow Important 100 40  ...  ... 
B9009/70 AULTBEG Yellow Important 100 40  ...  ... 
B9010/90 CRAIGMILL Yellow Important 100 40  ...  ... 
B9014/110 BRIDGE OF TOWIEMORE Yellow Important 100 40  ...  ... 
B9014/130 MILLTOWIE CULVERT Yellow Important 100 40  ...  ... 
B9014/150 BRIDGE OF MAISLEY Yellow Important 100 40  ...  ... 
B9014/70 BRIDGE OF BURNEND Yellow Important 100 40  ...  ... 
B9014/90 BRIDGE OF TOWIEBEG Yellow Important 100 40  ... Suggestion that Aberdeenshire assessed this earlier than
1996, however no calculations could be found nor any
assessment result.  Modern type of reinforced concrete box
culvert.   ... 
B9015/20 CROFT FARM Yellow Important 100 40  ... No known assessment.  Modern segmental concrete pipe
structure.   ... 
B9016/10 FORGIESIDE Yellow Important 100 40  ... No known assessment.  Buried steel pipe culvert.   ... 
B9017/20 NEWMILL BRIDGE Yellow Important 100 40  ...  ... 
B9089/20 WARDS CULVERT Yellow Important 100 40  ...  ... 
B9102/100 LYNES CULVERT Yellow Important 100 40  ... No known assessment.  ... 
B9102/30 BRIDGE OF CALLY Yellow Important 100 40  ...  ... 
B9118/10 WOODSIDE BRIDGE Yellow Important 100 40  ... No known assessment.  Unfinished 2020 PI report records
new BCIcrit of 28.08, very poor, which would make this a
higher priority structure.  Structural review required. KM
checked, report is approved with BCI of 55.48. ... 
B9136/50 GLENLIVET BRIDGE Yellow Important 100 40  ...  ... 
B9136/60 DRUMIN SMITHY Yellow Important 100 40  ... No known assessment.   ... 
B9138/20 BLACKSBOAT FLOOD SPAN Yellow Important 100 40  ...  ... 
C12E/30 REED Yellow Important 100 40  ...  ... 
Page 83

Page 84

C13E/10 BRIDGE OF LOSSIE Yellow Important 100 40  ... No known assessment.  ... 
C13E/20 AULTAHUISH Yellow Important 100 40  ...  ... 
C13E/30 YELLOWBOG Yellow Important 100 40  ...  ... 
C15E/30 DALUAINE Yellow Important 100 40  ...  ... 
C21H/10 GARRALBURN Yellow Important 100 40  ... No known assessment.  Multiple corrugated pipe-type
structure.   ... 
C2E/30 GLENLOSSIE DISTILLERY Yellow Important 100 40  ... No known assessment.  ... 
C31L/10 VICTORIA BRIDGE Yellow Important 100 40  ...  ... 
C3E/30 COWIES BRIDGE Yellow Important 100 40  ...  ... 
C3E/90 BOGNIE JUNCTION Yellow Important 100 40  ... No known assessment.  Corrugated pipe-type structure. 
Reconstructed/replaced 1990.   ... 
C43L/10 FREUCHNY Yellow Important 100 40  ... No known assessment.  Multiform culvert.   ... 
C59H/11 BUSH BRIDGE Yellow Important 100 40  ...  ... 
C73H/10 MILLTOWN OF ROTHIEMAY Yellow Important 100 40  ... WDM refers to a 2002 assessment with result 40/44
tonnes, or 24 units HB.  But also refers to HA result 38te type
HA.  Bridges is multiform.  Structural review recommended.  
... 
C7E/10 MAINS OF MOY Yellow Important 100 40  ...  ... 
U109H/10 DALUAINE DISTILLERY Yellow Important 100 40  ...  ... 
U132H/5 EASTER FODDERLETTER Red Standard - Medium 100 40  ...  ... 
U142½/30 NETHER TOMDOW Yellow Important 100 40  ...  ... 
U8E/15 MILL OF TYNET CULVERT Red Standard - Medium 100 40  ...  ... 
U97H/10 TOMLIATH Yellow Important 100 40  ...  ... 
C6E/10 KINLOSS BURN BRIDGE Yellow Important 100 40 Missing from original list - added in manually.   ...  ... 
U83H/20 WHITEHILLOCH (CABRACH) Red Standard - Medium 100 40 Changed to 13T GVW due to findings of 2022 PI and
subsequent assessment by Kim MacGowan.  ... Monitoring
recommended in 2022 PI report.  ... 
A940/20 GLENERNIE Yellow Important 100 40  ...  ... 
A98/310 SEATOWN BRIDGE Yellow Important 100 40  ...  ... 
B9007/10 LOGIE Yellow Important 100 40  ...  ... 
B9117/60 FARMTOWN Yellow Important 100 40  ...  ... 
U68AH/20 HOWDOUP Red Standard - Medium 100 40  ... Assessment dated 1996.  Structural review
recommended.  ... 2024 PI updated crit score to 0
U61L/10 BUCKIE BURN Red Standard - Medium 100 40 Updated PI 2024
C11E/10 ESS BRIDGE Amber Standard - Medium 80 105  ...  ... 
C17E/30 CAIRNFIELD Amber Standard - Medium 80 105  ...  ... 
C47H/10 GARROWOOD Amber Standard - Medium 80 105  ...  ... 
U135H/100 U135H/100 GAMHAINN CULVERT Amber Standard - Medium 80 105  ...  ... 
U31E/10 CAPRIESHILL Amber Standard - Medium 80 105  ...  ... 
U173E/10 LEE BRIDGE Black Standard - Low 70 110  ... Assessment by Mott MacDonald in 2024 has bridge failing
3T vehicle loading both lanes and single lane ... 
U117H/10 BRIDGE OF SLATEFORD Yellow Standard - High 60 111 Refurbishment works complete ...  ... 
U113E/10 DOWERY Yellow Standard - High 60 111  ...  ... 
U125AH/10 BALLACHURN Yellow Standard - High 60 111  ...  ... 
U128H/30 DELAVORA Yellow Standard - High 60 111  ...  ... 
U129E/10 GREENSIDE Yellow Standard - High 60 111  ...  ... 
Page 84

Page 85

U34H/10 TARNASH BRIDGE Yellow Standard - High 60 111  ... WDM notes indicate dispute over capacity.  Lower
capacity quoted here as per WDM structure summary. 
Structural review recommended.   ... 
U35H/10 DRUM BRIDGE Yellow Standard - High 60 111  ... Assessed with COBRAS yield line method.  ... 
U82H/10 Aldunie Yellow Standard - High 60 111  ... Replaced by U82H/11 in 2022.  Details here are for
U82H/11.   ... Superseded by U82H/11. 
U88E/30 BRIDGE OF NEWTON Yellow Standard - High 60 111  ...  ... 
U89E/40 PHORP Yellow Standard - High 60 111  ...  ... 
U108E/10 CANTSFORD Yellow Standard - High 60 111  ...  ... 
C2E/20 CLODDACH Red Standard - Low 50 122 Structure has been closed to vehicular traffic.   ... Currently
closed to all motorised traffic and way barred by concrete
blocks.  Pedestrian and cycle access permitted.  ... 
C18E/10 STONEWELLS Red Standard - Low 50 122 Access bridge to rear of former RAF Milltown - listed as
Privately owned in WDM.  ... Noted in WDM to be a private
bridge some 400m beyond the end of the adopted road. 
Steel beam and slab bridge providing rear access to the
disused Milltown Airfield.  ... 
C11E/40 WHITEMIRE Yellow Standard - Medium 40 124  ... No known assessment.  Unfinished 2020 PI report records
new BCIcrit of 55.10, poor, which would make this a higher
priority structure.  Structural review required.   ... 
C14E/5 MARCASSIE CULVERT Yellow Standard - Medium 40 124  ... No known assessment.  ... 
C19E/10 WAULKMILL CULVERT Yellow Standard - Medium 40 124  ... No known assessment.  Small masonry arch culvert.
Evident past intervention to prevent scour.  ... 
C1H/60 CALTERNACH Yellow Standard - Medium 40 124  ... No known assessment.  ... 
C1H/70 LITTLE NEWTON Yellow Standard - Medium 40 124  ...  ... 
C29E/10 TOREHEAD Yellow Standard - Medium 40 124  ...  ... 
C2E/40 FOTHS BURN Yellow Standard - Medium 40 124  ... No known assessment.  Refurbishment and strengthening
by fill replacement completed in 2021.  Recommend
assessment.  ... 
C2E/50 BIRNIE CULVERT Yellow Standard - Medium 40 124  ...  ... 
C2E/60 RASHCROOK Yellow Standard - Medium 40 124  ...  ... 
C34H/10 KNOCKBURN Yellow Standard - Medium 40 124  ... No known assessment.  ... 
C44L/20 GLENBURN BRIDGE Yellow Standard - Medium 40 124  ... No known assessment.   ... 
C48H/10 BRIDGE OF BRIDGEND Yellow Standard - Medium 40 124  ...  ... 
C4E/20 MOSSTOWIE CANAL Yellow Standard - Medium 40 124  ... No known assessment.   ... 
C62L/20 BLEACHFIELD Amber Standard - Low 40 124  ... No known assessment.  ... 
C72H/30 BURN OF HAUGHS BRIDGE closed to abnormal loads Yellow Standard - Medium 40 124  ...  ... 
C72H/50 MILTON BRIDGE Yellow Standard - Medium 40 124  ...  ... 
C8E/30 BANARACH Yellow Standard - Medium 40 124  ...  ... 
C8E/40 ABBOTSHILL Yellow Standard - Medium 40 124  ...  ... 
C8H/10 BRIDGE OF FORTEATH Yellow Standard - Medium 40 124  ...  ... 
C8H/20 BRIDGE OF GUESTLOAN Yellow Standard - Medium 40 124  ...  ... 
U124H/20 TROCHEIL Amber Standard - Low 40 124  ...  ... 
U131E/30 AUCHINROATH Amber Standard - Low 40 124  ...  ... 
U132H/10 INVERLOCHY Yellow Standard - Medium 40 124  ...  ... 
U132H/20 KINARDOCHY Yellow Standard - Medium 40 124  ...  ... 
U149E/10 CHARLOTTE STREET BRIDGE Amber Standard - Low 40 124  ...  ... 
U14E/20 DELFUR BRIDGE Yellow Standard - Medium 40 124  ...  ... 
Page 85

Page 86

U37H/10 ALLANBUIE CULVERT Yellow Standard - Medium 40 124  ...  ... 
U59H/10 MULBEN Yellow Standard - Medium 40 124  ...  ... 
U59L/10 BROXY BRIDGE Amber Standard - Low 40 124  ...  ... 
U63H/30 ALLT TERSIE Yellow Standard - Medium 40 124  ...  ... 
U66AL/10 PORTESSIE CULVERT Yellow Standard - Medium 40 124  ...  ... 
U68AH/30 DRUMGRAIN Yellow Standard - Medium 40 124  ...  ... 
U8E/10 NETHER DALLACHY RAIL Yellow Standard - Medium 40 124  ...  ... 
U124E/10 TROCHAIL Amber Standard - Low 40 124  ...  ... 
C10E/30 EARLSMILL Yellow Standard - Low 20 158  ...  ... 
C11E/20/JHC DALTULICH Yellow Standard - Low 20 158  ... Joint bridge with Highland Council. Moray Council is the
maintainer.   ... 
C17H/20 LYNETIAN Yellow Standard - Low 20 158  ...  ... 
C4L/10 BERRYHILLOCK BRIDGE Yellow Standard - Low 20 158  ... No Known assessment.  ... 
C72H/10 OLDTOWN Yellow Standard - Low 20 158  ...  ... 
C8H/40/JAC BRIDGE OF HAUGH Yellow Standard - Low 20 158  ... Joint bridge with Aberdeenshire Council ... Joint with
Aberdeenshire (their ref. C116S/10).  Moray is the
maintainer (letter 18/12/2006). 
U13E/10 MALCOLM BRIDGE Yellow Standard - Low 20 158  ...  ... 
U14E/30 EAST STREET,  FOCHABERS Yellow Standard - Low 20 158  ...  ... 
U171E/60 BOW BRIDGE, ELGIN Yellow Standard - Low 20 158  ...  ... 
U33H/10 COLDHOME Yellow Standard - Low 20 158  ...  ... 
U47E/10 LOANHEAD CULVERT Yellow Standard - Low 20 158  ...  ... 
U57AL/10 DESKFORD BRIDGE Yellow Standard - Low 20 158  ...  ... 
U58AL/10 BLOOMFIELD Yellow Standard - Low 20 158  ...  ... 
U59H/20 MALCOLMBURN Yellow Standard - Low 20 158  ...  ... 
U76E/10 BARLEYMILL Yellow Standard - Low 20 158  ... Two-span masonry arch structure with differing Mexe
results for each span. WDM records are ambiguous. 
Structural review recommended.  ... 
U89E/10 CLASHDHU Yellow Standard - Low 20 158  ...  ... 
U95E/10 SCOTSBURN Yellow Standard - Low 20 158  ...  ... 
U171E/70 BRAELOSSIE Yellow Standard - Low 20 158 Structure has been closed to vehicular traffic.   ... Access to
vehicular traffic currently prevented by removeable bollards.
Assessment and strengthening early 2000s by Cintec/Gifford. 
... 
U99H/20 GIANT'S CHAIR Yellow Standard - Low 20 158  ...  ... 
A941/340 NEW BISHOPMILL Green Vital 7 177 Refurbishment completed early 2026 ...  ... 
U170E/20 KIRKHILL DRIVE LHANBRYDE Green Vital 7 177 Refurbishment works complete ... No known assessment.  ... 
A941/360 SPYNIE CANAL Green Vital 7 177  ...  ... 
A98/340 INCHGOWER Green Vital 7 177  ...  ... 
A98/350 STONIE'S  CULVERT Green Vital 7 177  ...  ... 
A98/351 STONIE'S PIPE Green Vital 7 177  ...  ... 
A98/360 TYNET Green Vital 7 177  ...  ... 
B9015/100 LEIN BRIDGE Green Vital 7 177  ...  ... 
C20H/10 CULRAGGIE (REFREISH) Green Vital 7 177  ...  ... 
U118E/10 SHOUGLE Green Vital 7 177  ...  ... 
U169E/10 HARBOUR STREET HOPEMAN Green Vital 7 177  ...  ... 
U172E/10 LOSSIEMOUTH CANAL Green Vital 7 177  ...  ... 
Page 86

Page 87

B9008/10 AUCHRIACHAN Green Important 5 189  ...  ... 
A941/190 BURNSIDE Green Important 5 189  ...  ... 
A920/170 BOGHEAD Green Important 5 189  ...  ... 
A939/180 BLAIRNAMARROW Green Important 5 189  ...  ... 
A939/181 LURGH DUBH Green Important 5 189  ...  ... 
A939/191 GLENMULLIACH CULVERT Green Important 5 189  ...  ... 
A939/230 TOM M'OR CULVERT Green Important 5 189  ...  ... 
A939/240/JHC BRIDGE OF BROWN Green Important 5 189  ... Joint bridge with Highland Council ... 
A939/32 GLENMULLIE Green Important 5 189  ...  ... 
A939/33 BADNAFRAVIE Green Important 5 189  ...  ... 
A940/30 WOODSIDE CULVERT Green Important 5 189  ...  ... 
A940/40 KNOCKACH Green Important 5 189  ...  ... 
A941/100 BRIDGEND Green Important 5 189  ...  ... 
A941/130 BALLOCHFORD CULVERT Green Important 5 189  ...  ... 
A941/140 BALLOCH Green Important 5 189  ...  ... 
A941/150 BRIDGEHAUGH Green Important 5 189  ...  ... 
A941/160 BURNEND Green Important 5 189  ...  ... 
A941/170 BRIDGE OF CRACHIE Green Important 5 189  ...  ... 
A941/180 MALTKILN BRIDGE Green Important 5 189  ...  ... 
A941/200 GLENBURNIE PIPE Green Important 5 189  ...  ... 
A941/225 SOUTH CULVERT BLACK BURN Green Important 5 189  ...  ... 
A941/226 NORTH CULVERT BLACK BURN Green Important 5 189  ...  ... 
A941/230 ROTHES BURN Green Important 5 189  ...  ... 
A941/240 BACK BURN BRIDGE Green Important 5 189  ...  ... 
A941/260 CAOCHAN STRIPE Green Important 5 189  ...  ... 
A941/270 BIRCHFIELD Green Important 5 189  ...  ... 
A941/280 ROTHES GLEN HOTEL Green Important 5 189  ...  ... 
A941/290 NETHERGLEN Green Important 5 189  ...  ... 
A941/300 LONGMORN BRIDGE Green Important 5 189  ...  ... 
A941/310 BIRKENHILL BRIDGE Green Important 5 189  ...  ... 
A941/50 Dykeside Green Important 5 189  ... Reconstructed with new steel deck in 2022.  Find
AIP/design details to confirm design loading for LM3/SV to
supersede HB rating.  ... N.B. This structure was replaced in
A941/51 at Dykeside.  Details here are for the new bridge. 
A941/60 AUCHMAIR Green Important 5 189  ...  ... 
A942/20 REIDHAVEN STREET Green Important 5 189  ...  ... 
A95/50 BRIDGE OF FOWLWOOD Green Important 5 189  ...  ... 
A95/60 BRIDGE OF BRACO Green Important 5 189  ...  ... 
A95/80 BRIDGE OF AUCHINHOVE Green Important 5 189  ...  ... 
A98/320 BOGS OF RANNAS Green Important 5 189  ...  ... 
A98/330 RANNAS BRIDGE Green Important 5 189  ...  ... 
A990/20 PORTGORDON Green Important 5 189  ...  ... 
A990/30 BUCKPOOL Green Important 5 189  ...  ... 
B9008/20 CARTACH CULVERT Green Important 5 189  ...  ... 
B9008/30 BRIDGE OF TOMNAVOULIN Green Important 5 189  ...  ... 
B9008/70 AUCHBRECK CULVERT Green Important 5 189  ...  ... 
Page 87

Page 88

B9008/90 TOMMORE CULVERT Green Important 5 189  ...  ... 
B9009/100 CRAIGHEAD Green Important 5 189  ...  ... 
B9009/11 BRIDGE OF AUCHGORUM Green Important 5 189  ...  ... 
B9009/110 MORINSH Green Important 5 189  ...  ... 
B9009/120 SHENVAL Green Important 5 189  ...  ... 
B9009/20 LETTOCH Green Important 5 189  ...  ... 
B9009/50 BRIDGE OF GLACK Green Important 5 189  ...  ... 
B9009/60 BALMERION Green Important 5 189  ...  ... 
B9009/80 TOMACHLAVEN Green Important 5 189  ...  ... 
B9009/90 ALLT LOAN Green Important 5 189  ...  ... 
B9010/100 FORD BRIDGE Green Important 5 189  ...  ... 
B9010/20 PALMERSCROSS Green Important 5 189  ...  ... 
B9010/35 PITTENDREICH (ALLARBURN) Green Important 5 189  ...  ... 
B9010/50 WESTER PITTENDREICH Green Important 5 189  ...  ... 
B9010/70 MAINS OF KELLAS Green Important 5 189  ...  ... 
B9011/5 CASTLE BRIDGE Green Important 5 189  ...  ... 
B9012/10 WATERTON Green Important 5 189  ...  ... 
B9012/20 CROSSLOTS Green Important 5 189  ...  ... 
B9014/10 BRIDGE OF POOLINCH Green Important 5 189  ...  ... 
B9014/100 LOWER TOWIE BRIDGE Green Important 5 189  ...  ... 
B9014/140 BRIDGE OF AUCHINDACHY Green Important 5 189  ...  ... 
B9015/10 ROTHES GREEN Green Important 5 189  ...  ... 
B9015/40 GARBITY Green Important 5 189  ...  ... 
B9015/70 ORBLISTON Green Important 5 189  ...  ... 
B9015/80 GARMOUTH RAILWAY Green Important 5 189  ...  ... 
B9016/30 RYERIGGS Green Important 5 189  ...  ... 
B9017/10 NEWMILL WEST Green Important 5 189  ...  ... 
B9017/30 CROSSBURN Green Important 5 189  ...  ... 
B9018/100 SWELLEND Green Important 5 189  ...  ... 
B9018/110 BERRYHILLOCK CULVERT Green Important 5 189  ...  ... 
B9018/120 NETHER BLAIROCK Green Important 5 189  ...  ... 
B9018/140 LINTMILL 2 Green Important 5 189  ...  ... 
B9018/20 BRIDGE OF CROFTGIBB Green Important 5 189  ...  ... 
B9018/30 BALNAMOON Green Important 5 189  ...  ... 
B9018/40 BURNEND BRIDGE Green Important 5 189  ...  ... 
B9018/60 WINDYHILLS Green Important 5 189  ...  ... 
B9018/70 LANGLAN BURN Green Important 5 189  ...  ... 
B9018/80 UPPER CRAIBSTONE Green Important 5 189  ...  ... 
B9018/90 CRAIBSTONE Green Important 5 189  ...  ... 
B9022/60 KNABBY GATES Green Important 5 189  ...  ... 
B9102/110 ARCHIESTOWN Green Important 5 189  ...  ... 
B9102/120 SANDYHILLOCK Green Important 5 189  ...  ... 
B9102/20 MAINS OF KIRDELLS Green Important 5 189  ...  ... 
B9102/70 CARDOW Green Important 5 189  ...  ... 
B9102/90 BRACKENHOWES Green Important 5 189  ...  ... 
B9103/10 SPYNIE CANAL BRIDGE Green Important 5 189  ...  ... 
Page 88

Page 89

B9103/100 BOAT O'BRIG Green Important 5 189  ...  ... 
B9103/110 AUCHROISK Green Important 5 189  ...  ... 
B9103/120 AUCHROISK DISTILLERY Green Important 5 189  ...  ... 
B9103/21 ARTHUR'S CULVERT Green Important 5 189  ...  ... 
B9103/30 CAYSBRIGGS Green Important 5 189  ...  ... 
B9103/50 LOCH NA BO Green Important 5 189  ...  ... 
B9103/60 CLATTERINGBRIG Green Important 5 189  ...  ... 
B9103/70 ALTONSIDE Green Important 5 189  ...  ... 
B9103/80 DEANS HILLOCK Green Important 5 189  ...  ... 
B9136/10 RUTHVEN BRIDGE Green Important 5 189  ...  ... 
B9136/30 BALLCORACH Green Important 5 189  ...  ... 
B9136/40 ALLTGLANDER Green Important 5 189  ...  ... 
B9138/10 BLACKSBOAT MAIN BRIDGE Green Important 5 189  ...  ... 
B9138/30 BLACKSBOAT RAILWAY BRIDGE Green Important 5 189  ...  ... 
C12E/20 BLACKBURN BRIDGE Green Important 5 189  ...  ... 
C13E/40 STRONDOW Green Important 5 189  ...  ... 
C16E/10 OLD RAILWAY PORTGORDON Green Important 5 189  ...  ... 
C16E/20 BONE MILL BRIDGE Green Important 5 189  ...  ... 
C17H/10 EDINVILLIE Green Important 5 189  ...  ... 
C1E/10 EASTER LOCHS Green Important 5 189  ...  ... 
C1E/20 LHANBRYDE OLD Green Important 5 189  ...  ... 
C1E/30 EASTER COXTON Green Important 5 189  ...  ... 
C1E/50 FOGWATT CULVERT Green Important 5 189  ...  ... 
C20E/10 LINKWOOD Green Important 5 189  ...  ... 
C22E/11 LANDSHUT BRIDGE Green Important 5 189  ... Built 2014.  Designed to BS 5400 for full HA and 37.5 units
of HB, as recorded in the AIP which can be found in the H&S
file.  ... 
C25E/20 WARDS ARMCO Green Important 5 189  ...  ... 
C3E/10 MONAUGHTY FOREST Green Important 5 189  ...  ... 
C40E/10 REIKET LANE RAILWAY (NEW) Green Important 5 189  ...  ... 
C73H/20 BURN OF FOURMANHILL BRIDGE Green Important 5 189  ...  ... 
C7E/20 DYKE Green Important 5 189  ...  ... 
U128H/10 DELNABO Green Important 5 189  ...  ... 
U149E/21 WEST STREET FOCHABERS Green Important 5 189  ...  ... 
U106H/10 BIRKENBUSH BRIDGE Green Standard - High 3 310  ...  ... 
U172E/20 LOSSIEMOUTH SEATOWN Green Standard - High 3 310  ...  ... 
U57H/40 SANDYHILL BRIDGE Green Standard - High 3 310  ...  ... 
U72L/10 ALLALOTH Green Standard - High 3 310  ...  ... 
U88E/20 BANTRACH BRIDGE Green Standard - High 3 310 Changed BCIs due to 2020-21 refurbishment contract. 
Strengthened 2004.  ...  ... 
B9117/30 SHORTBANK BRIDGE Green Standard - Medium 2 315  ...  ... 
C14E/10 WARDEND Green Standard - Medium 2 315  ...  ... 
C19E/20 MEFT Green Standard - Medium 2 315  ...  ... 
C1H/30 BROOMHEAD Green Standard - Medium 2 315  ...  ... 
C22E/30 Calcots Bridge Green Standard - Medium 2 315  ...  ... 
C24E/10 GILSTON CULVERT Green Standard - Medium 2 315  ...  ... 
Page 89

Page 90

C24E/20 NORTH GILSTON Green Standard - Medium 2 315  ...  ... 
C24E/30 SALTERHILL Green Standard - Medium 2 315  ...  ... 
C26E/20 MOSSTOWIE Green Standard - Medium 2 315  ...  ... 
C3E/40 STONEYFIELD Green Standard - Medium 2 315  ...  ... 
C3E/50 HELDON WOOD Green Standard - Medium 2 315  ...  ... 
C3E/70 BRIACH CULVERT Green Standard - Medium 2 315  ...  ... 
C44L/10 BOGSIDE CULVERT Green Standard - Medium 2 315  ...  ... 
C46L/10 BRIDGE OF CRANNACH Green Standard - Medium 2 315  ...  ... 
C47H/40 BERRYHILLOCK Green Standard - Medium 2 315  ...  ... 
C49H/10 DALMANY Green Standard - Medium 2 315  ...  ... 
C54H/10 CROOKSMILL Green Standard - Medium 2 315  ...  ... 
C5E/10 GRANGE HILL Green Standard - Medium 2 315  ...  ... 
C5E/30 EAST GRANGE Green Standard - Medium 2 315  ...  ... 
C67L/11 BIRKENBUSH RAILWAY Green Standard - Medium 2 315  ... No assessment required.  Bridge demolished and replaced
with pipe.   ... 
U105E/20 CLOVES BRIDGE Green Standard - Medium 2 315  ...  ... 
U111E/10 CROY Green Standard - Medium 2 315  ...  ... 
U112E/10 MILTONDUFF Green Standard - Medium 2 315  ...  ... 
U124H/10 TERVIE (MILLTOWN OF TOMBRECKACHIE) Green Standard - Medium 2 315  ...  ... 
U131E/20 BROADBURN Green Standard - Medium 2 315  ...  ... 
U132H/30 SILVER BRIDGE Green Standard - Medium 2 315  ...  ... 
U139E/10 BRACKEN HOWES Green Standard - Medium 2 315  ...  ... 
U139E/20 BRIDGE OF BALLINTOMB Green Standard - Medium 2 315  ...  ... 
U18E/10 BOW BRIDGE, GARMOUTH Green Standard - Medium 2 315  ...  ... 
U18E/20 CHURCH RAILWAY, GARMOUTH Green Standard - Medium 2 315  ...  ... 
U19E/20 WESTERTON Green Standard - Medium 2 315  ...  ... 
U27E/10 LONGHILL BURN Green Standard - Medium 2 315  ...  ... 
U30E/10 WOODPARK Green Standard - Medium 2 315  ...  ... 
U63H/20 BRIDGE OF LACKDHU Green Standard - Medium 2 315  ...  ... 
U63L/30 DRYBRIDGE CULVERT Green Standard - Medium 2 315  ...  ... 
U83H/10 MILLTOWN Green Standard - Medium 2 315  ...  ... 
U99H/10 DULLAN BRIDGE Green Standard - Medium 2 315  ...  ... 
C8E/10 DALVEY SMITHY RAILWAY Green Standard - Low 1 352  ... BCIcrit score given as -999, denotes erroneous input. 
Condition information not reliable, provisionally high alert
score.  Inspection recommended to improve reliability of
priority score.  ... 
C8E/20 DALVEY RAILWAY BRIDGE Green Standard - Low 1 352  ... BCIcrit score given as -999, denotes erroneous input. 
Condition information not reliable, provisionally high alert
score.  Inspection recommended to improve reliability of
priority score.  ... 
C10E/10 DALVEY Green Standard - Low 1 352  ...  ... 
C11L/10 WESTON Green Standard - Low 1 352  ...  ... 
C17E/10 BURNSIDE OF ENZIE Green Standard - Low 1 352  ...  ... 
C17H/30 BLAIRNAIN Green Standard - Low 1 352  ...  ... 
C22E/20 BAREFLAT HILLS RAILWAY Green Standard - Low 1 352  ...  ... 
C43L/30 RATHVEN Green Standard - Low 1 352  ...  ... 
C47H/20 BRACO CULVERT Green Standard - Low 1 352  ...  ... 
Page 90

Page 91

C54H/20 BRIDGE OF ROSARIE Green Standard - Low 1 352  ...  ... 
C62L/30 MILTON BURN Green Standard - Low 1 352  ...  ... 
C72H/21 KINMINITIE BRIDGE Green Standard - Low 1 352  ...  ... Now C72H/20.  See school bus worksheet notes. 
C7L/10 CRAIBSTONE CULVERT Green Standard - Low 1 352  ...  ... 
C7L/20 BROADRASHES Green Standard - Low 1 352  ...  ... 
C80H/10 FITTIE Green Standard - Low 1 352  ...  ... 
U128E/10 LONGMORN CULVERT Green Standard - Low 1 352  ...  ... 
U138E/10 RINGORM BRIDGE Green Standard - Low 1 352  ...  ... 
U144E/10 ALDAVONNIE Green Standard - Low 1 352  ...  ... 
U144E/20 LYNE OF KNOCKANDO Green Standard - Low 1 352  ...  ... 
U146H/10/JAC MARKETHILL BRIDGE Green Standard - Low 1 352  ... Joint bridge with Aberdeenshire Council ... Joint with
Aberdeenshire (their ref. U146H/10).  Moray is the
maintainer (letter 18/12/2006). 
U19H/10 GRANGE JUNCTION Green Standard - Low 1 352  ...  ... 
U23H/10 BURNEND CULVERT Green Standard - Low 1 352  ...  ... 
U43BH/10 BACKMUIR Green Standard - Low 1 352  ...  ... 
U62E/10 MILL OF GRANGE Green Standard - Low 1 352  ...  ... 
U63L/20 AUCHENTAE Green Standard - Low 1 352  ...  ... 
U8E/20 CHAPELFORD Green Standard - Low 1 352  ...  ... 
U95H/10 MILLTOWN OF LAGGAN Green Standard - Low 1 352  ...  ... 
U171E/80/RFB OLD BREWERY BRIDGE Green Standard - Low 1 352 Structure has been closed to vehicular traffic.  Now NN151. 
... Now NN151.  Out of scope.  Access to vehicular traffic
currently prevented by removeable bollards.  ... 
Page 91

Page 92

Page 92

Page 93

Report to: Economic Development
and Infrastructure
Services Committee 
Meeting Date: 10 March 2026  
Report by: Executive Director Economy, Enterprise and Operations      
Author: Timothy Mackay Contact
Email:
Timothy.mackay@moray.gov.uk 
Subject: Transportation Capital and Revenue Budgets 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to approve the plans to deliver the capital and revenue
programme in Transportation in 2026/27.  
1.2  This report is submitted to Committee in terms of Section III (F) (34) of the Council's
Scheme of Administration relating to the provision, development and monitoring of the
Council’s Economic Development and Infrastructure Services.  
2.  SUMMARY  
2.1  The report sets out the plans for revenue and capital expenditure for the Transportation
budget for 2026/27.  
3.  RECOMMENDATIONS 
3.1  It is recommended that Committee:   
i)  approve the plans to deliver the capital and revenue programme for 2026/27
as contained in this report; and   
ii)  delegate authority to the Head of Environment and Operations to apply for
grants for the funding areas set out in this report at para 5.21.   
Timothy Mackay
Service Manager, Transportation 
Item 10.
Page 93

Page 94

4.  BACKGROUND AND CONTEXT  
4.1  The Transportation service delivers the council services and duties in relation to public
transport including m.connect, home to school transport, transport development, traffic
management, road safety, sustainable and active travel, and car parks, as well as advising
and preparing recommendations to members on matters of transport strategy and policy.  
4.2  This report sets out plans for each team within Transportation to deliver those services
and duties in line with the approved revenue and capital budgets for the financial year
2026/27. 
5.  PROPOSALS  
Public Transport Unit (PTU)
5.1 
5.2 
5.3 
5.4 
5.5 
5.6 
The 2026/27 revenue budget for the Public Transport Unit is £5,537k. The major element of
the budget relates to the statutory provision of home to school transport. The budget is
factored to 195 school days, which reflects the projected school calendar for the
forthcoming year. The major areas of expenditure are set out below. 
The Council has a statutory duty to provide transport between home and school for
eligible pupils travelling to and from their zoned schools. Following a recent procurement
exercise the contract for the service has been retendered to start in April 2026. The
contract length is for five years with an option for two additional one-year extensions. 
Home to School Transport 
This is provided by a mix of external supplier and the Council’s own fleet. Following
changes to transport entitlement from 1 mile to 2 miles for primary school pupils, and the
recent re-tender, school routes have been reviewed to maximise their efficiency whilst
maintaining service. 
The budget for this service is £4,000k and provides home to school transport for 2,500
pupils per year. Income of £14k is budgeted in relation to discretionary transport provision,
which offers pupils not eligible for free provision access to a seat on a closed contract
school bus. 
Infrastructure, Systems and Services
This area of expenditure set at £182k covers statutory maintenance for roadside
passenger shelters and bus stops plus software licensing and maintenance fees for the
m.connect demand responsive booking system, on bus ticket machines, tablet SIMs and
other sundry items. The Council was awarded £395k in grant funding from Transport
Scotland for Bus Infrastructure improvements, which will see the replacement of around
40 bus shelters and all bus stop flags in Moray. 
Social Care Transport
Transport is provided by the Public Transport Unit to a number of projects, day care
centres and respite centres for vulnerable social care clients. Costs of this transport are
recharged back to the various social care teams and projects across the Council. Like
home to school transport, a retendering exercise for the service is underway following an
optimisation of service provision, this contract is also planned to start in April 2026. 
Page 94

Page 95

5.7 
5.8
m.connect
This budget of £180k is allocated to m.connect, the council’s bus services which includes
a proportion of the overall vehicle and property costs associated with the delivery of public
transport. Income levels are largely within expectations, with a focus in the next year on
stabilising growth by increasing reliability and customer satisfaction. 
Budgeted external income is £303k, made up of cash and card paid fares, m.connect
concessionary fare reimbursement, and the Scottish Government’s mileage based
Network Support Grant  
Traffic (Revenue)
5.9 
5.10 
5.11 
5.12 
5.13 
5.14 
5.15
The Traffic Engineers and supporting team members cover statutory duties relating to
Streetworks, Road Safety and Traffic Management. The Traffic team has a net revenue
budget of £868k. The planned expenditure for the team is set out in more detail below. 
The revenue budget includes an anticipated income from service users of £309k. This
comprises £219k for processing Temporary Transport Regulation Orders and issuing
permits such as Road Opening Permits. £90k is budgeted for income relating to Road
Construction Consent inspections. 
The budget also includes allowances for licences for Road Traffic Accident software, the
Speed Compliance Tool and software for the collection and analysis of traffic count and
vehicle speed data from permanent and temporary counter sites across Moray. Accident
and traffic data is important information required to enable Transportation’s statutory
duties in relation to road safety and the preparation of transport strategies to support the
Moray Local Development Plan. 
The Traffic Team is responsible for a small revenue budget for traffic signals, road signs
and road markings to cover their general maintenance and the refresh of road markings as
part of an annual programme. The current costs associated with the maintenance and
operation of traffic signals is £33k. As signals infrastructure age these costs are set to
increase, and decisions to replace (on a capital basis) are based on anticipated
need/failure rate. It should be noted that this £33k represents a third of the total allocated
budget (£100k) and therefore this makes up a significant proportion of expenditure. 
The remaining revenue budget is used for the general maintenance of road signs, road
markings and sundry items such as bollards, cat’s eyes and verge marker posts, which
when appropriately maintained all contribute to the safety of road users on rural roads. It
should be noted that our planned works programme exceeds our budget allocation which
means that some works need to be carried over to future years and in any event all works
are prioritised to ensure those of greatest need and benefit are undertaken first.
Increasingly, those works required in compliance with our statutory duties and legislation
take precedence. 
Traffic (Capital)
The overall net capital budget for Traffic is £391k. Like last year, there continues to be the
opportunity to reallocate budgets to different workstreams in-year to ensure the budget is
spent. The amounts in this report relate to the allocations in the three-year Capital Plan. 
The Council has a statutory duty to carry out studies of road accidents and “take such 
Page 95

Page 96

5.16 
5.17 
5.18 
5.19 
5.20 
5.21 
measures as appear to the authority to be appropriate to prevent such accidents”. It 
is proposed to allocate £89k of the £391k to deliver minor road safety interventions 
in priority areas. 
In 2025/26 Scottish Government indicated that funding from their Road Safety
Infrastructure Fund (RSIF) of £175k would be awarded which would be used for
improvements to strategic routes (road markings, verge markers, cat’s eyes). However
following discussions with Transport Scotland regarding recent accidents on key strategic
routes, £903.5k was awarded for re-surfacing projects on the A98 between Swiss Cottage
and Tullochmoss and on the A941 – between the former Neil Millars Garage to 300m North
of C2e.  As the RSIF is an annual fund, it is anticipated that there will an award in 26/27 of
£175k. 
The Council also has a statutory duty to provide disabled parking spaces near the 
homes of eligible people when they apply, as well as accessibility improvements such as
dropped kerbs to assist people with mobility disabilities and parents/carers with 
pushchairs at places where they need to cross the road. £38k will be utilised by the 
Traffic team to deliver in the region of 62 parking spaces (average number of requests 
per year over the past three years) and approximately 15 dropped kerbs. 
For New Traffic Signs and Road Markings £44k has been allocated to enable the Traffic
Team to provide new road signs, markings and the like to react to changes in the road 
and to support new Traffic Regulation Orders. Other areas of capital expenditure include
Traffic Data Collection Equipment (£23k), Traffic Signal Replacement (£66k) and Road
Safety Barriers (£131k). 
For 2026/27 the block grant for Active Travel Infrastructure Fund (ATIF1) has been 
confirmed as £500k. ATIF 1 is an annual grant from Scottish Government for active travel
infrastructure and resourcing. Of this, around £100,000 is spent on consultant design fees
to work up schemes for the construction and future grant applications. This year will see a
drafting update to the Active Travel Strategy which will inform future priorities. 
Applications for Scottish Government’s Active Travel Infrastructure Fund for larger 
construction project and design funding (ATIF2) were submitted in January with 
awards likely to be made in April 2026. Two applications for construction projects 
were re-submitted, a new pedestrian island on Linkwood Road, between Dunkinty and 
Linkwood Steading, and Phase 1 of the active travel improvements to Coulardbank 
Road, Lossiemouth. An application for an options appraisal for improving active travel 
provision at the Morriston Road/Brumley Brae junction and along Morriston Road up 
to the A941 junction has also been re-submitted. 
Behaviour Change funding is now mostly distributed through the HITRANs Regional
Transport Partnership People and Place programme. For 26/27 the Council is expected to
be awarded £356k for both capital and revenue projects. Projects will include sustainable
travel events and engagement, working with schools and young people as well as the
Moray Bothy through our delivery partners Living  Streets and Cycling UK. The Council will
also receive a direct award for active and sustainable transport from Transport Scotland of
£107k to compliment the funding from the Regional Transport Partnership and support the
delivery engagement activities. Additional funding opportunities present themselves
Page 96

Page 97

5.22
throughout the year for the delivery of Bikeability and improvements to the National Cycle
Network 1. Applications will be made when these funding streams become available. 
In line with the Transportation team’s remit to promote road safety, sustainable and 
active travel, and public transport, there can be mid-year opportunities to benefit 
from grant funding to deliver these priorities. The deadlines often preclude 
submission of a report to the service committee. It is requested that delegated 
authority is granted to the Head of Operations and Environment to approve grant funding
applications where these are for clear ‘business as usual’ work priorities, and do not
require any other unbudgeted expenditure by the council. 
Transport Development
5.23 
5.24 
5.25 
5.26 
5.27
The Transport Development team has a revenue budget of £250k. The Moray Local
Development Plan is currently being reviewed, with the new plan due to be adopted in
2028. The Evidence Report was approved in 2024 and bid sites have been submitted and
considered. The Transport Appraisal is nearing completion, following an update of the
Elgin Traffic Model to a 2023 base year. 
The team are responsible for the Roads Authority response to planning applications and
planning enforcement cases, along with preparation of the Local Development Plan. The
team also covers Road Construction Consent (Section 278 Agreements) and the adoption
of new roads infrastructure. A review of the charging structure and a proposed Code of
Practice is planned in 2026. 
Car Parks
The 2026/27 revenue budget for car parks is £(674)k, taking into account budgeted income
of £(1,166)k. Income for car parks continues to fall short of the budgeted target, and new
revenue sources are being pursued in 2026/27 such as the introduction of charges for
HGVs in Elgin as well as improvements to winter maintenance and the general condition of
the multistorey car parks to encourage greater use. This maintains the car parks in Moray
governed by the car park order and funds the enforcement of the regulations governing the
use of the pay and display in Elgin. 
The infrastructure and maintenance of the car parks includes drainage (gulley) clearing,
patch surfacing repairs and kerb works, lighting repairs, signs and markings and winter
maintenance. The balance of the expenditure in revenue includes employee costs, rent,
rates and energy costs, clothing and uniform. 
A capital budget of £27k per annum from capital is to enable a programme of resurfacing
and lighting replacement in surface car parks. The ongoing programme will be based on a
prioritised approach for inclusion and approval in future years as appropriate. 
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  x
Policy and Legal X 
Page 97

Page 98

Financial X 
Risk X 
Staffing  X
Best Value and Transformation  X
Property  X
Information Communications Technology/Digital  X        X
Equalities. Social Inclusion and Economic Impact   X
Climate Change and Biodiversity Impact X 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population 
6.3  Policy and Legal 
Delegated authority to make grant applications is requested in this report, which is a
deviation from the Financial Regulations. The Chief Financial Officer has been consulted
and is supportive of this request.  
6.4  Financial 
This report sets out the plans to deliver the revenue and capital budget allocation to
Transportation for 2026/27. See APPENDIX A. 
6.5  Risk 
The budgeted incomes for public transport, traffic and car parks are based on the best
available information but may be subject to variation based on external influences.  
6.6  Staffing 
None.  
6.7  Best Value and Transformation 
None.  
6.8  Property
Page 98

Page 99

None.  
6.9  Information Communications/Technology/Digital 
None.  
6.10  Equalities, Social Inclusion and Economic Impact 
There are a number of areas within the Transportation budget that support 
equalities, social inclusion and rights as well having a socioeconomic benefit. This
includes but is not limited to expenditure on Active and Sustainable travel schemes, Road
Safety Improvements, Public Transport (including the m.connect offer) and contributions
through securing developer-led roads improvements.  
6.11  Climate Change and Biodiversity Impacts 
There is a strong link between Sustainable, Active Travel and health and wellbeing.
Promotion of Public Transport and alternatives to private transport contribute to reducing
carbon emissions and wider biodiversity gains. Alternative methods of construction such
as Sustainable Urban Drainage schemes within new and existing roads infrastructure can
reduce surface flooding risks and contribute to wider climate change targets. 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with Executive Director Economy, Enterprise
and Operations, Head of Operations and Environment, Chief Financial Officer, Service
Manager Legal Services, Service Manager People Management, Equal Opportunities
Officer, and L Rowan, Committee Services Officer and any comments made have been
incorporated into the report.   
8.  BACKGROUND PAPERS  
8.1  None.   
Page 99

Page 100

Appendix A 
2026/27
Allocation 
Traffic Capital 
Road safety barrier provision £131,000
Road safety provision £89,000
Disability Adaptations £38,000
New Road Signs and Markings £44,000
Traffic Data Collection Equipment £23,000
Traffic Signal Replacement £66,000
Sub-total £391,000 
Traffic Revenue
Traffic (Core) £868,300
Transport Development £250,000
Sub-total £1,118,300    
Car Parks 
Capital £27,000
Revenue £(673,649)
Sub-total £(646,649)    
Public Transport Unit 
Capital (Bus Stop Infrastructure Fund) £395,000
Revenue £5,537,089
Sub-total £5,932,089     
Capital Budget Total £813,000
Revenue Budget Total £5,981,740
Capital and Revenue Total £6,794,740   
Page 100

Page 101

Report to: Economic Development and
Infrastructure Services
Committee 
Meeting Date: 10 March 2026  
Report by: Executive Director Economy, Enterprise and Operations      
Author: Paul Wolverson Contact
Email:
Paul.wolverson@moray.gov.uk 
Subject: Environmental Protection Capital and Revenue Budgets 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to approve the plans to deliver the capital and revenue
programme in Environmental Protection in 2026/27.  
1.2  This report is submitted to Committee in terms of Section III (F) (34) of the Council's
Scheme of Administration relating to the provision, development and monitoring of the
Council’s Economic Development and Infrastructure Services.  
2.  SUMMARY  
2.1  The revenue budgets support the delivery of the business as usual activities of the waste,
open spaces, catering and facilities services.  
2.2 The capital budgets for 2026/27 with regards waste management will be used primarily to
support the provision of the wheeled bins for domestic and commercial premises and the
provision of skips at Household Waste and Recycling Sites.  
2.3 The capital budgets for 2026/27 with regards open spaces will be used to support the
completion of the construction of phase one of a new cemetery in Elgin, improvements in
play areas and cemeteries, as well as commencing the initial work in pursuance of new
cemetery provision at Lossiemouth and Broomhill.  
2.4 The capital budgets for 2026/27 for facilities management will be used on an emerging
basis to replace any broken and damaged equipment.  
2.5 The report asks Members to approve the proposed revenue and capital spend within
Environmental Services.  
Item 11.
Page 101

Page 102

3.  RECOMMENDATIONS 
3.1  It is recommended that Committee:   
i)  approve the plans to deliver the capital programme for 2026/27 as contained
in this report;   
ii)  grant delegated authority to the Service Manager Environmental Services to
proceed with necessary maintenance works and prioritise the works in
accordance with any budgetary restrictions;   
iii)  delegate authority to the Head of Operations and Environment to apply for
grants in support of the areas of work identified in sections 5; and   
Paul Wolverson
Service Manager Environmental Services 
4.  BACKGROUND AND CONTEXT 
4.1  The Environmental Services team delivers the council services and duties in relation to
waste and recycling, open spaces, school catering and facilities management.  
4.2  The revenue budgets fund the business as usual activities for the different service areas.
This includes: 
• Waste and recycling collections.
• Provision of Household Waste and Recycling Centres. 
• Litter picking and litterbin emptying. 
• Street sweeping. 
• Maintenance of the Councils Parks and Open Spaces. 
• Highway verge grass cutting. 
• Cemetery provision and management, including a burial service. 
• Preparation and provision of school meals across the Councils school estate. 
• Building cleaning and Janitorial service across the Councils assets.  
4.3 The table below shows the 2026/27 revenue budgets 
Service Area Revenue Budget 2026/27
Waste Management £8,911,461 
Building Cleaning and Catering £8,709,065
Open Space £1,944,897 
4.4 This report sets out plans how the respective teams within Environmental Services will
deliver the services and duties in line with the approved capital budgets for the financial
year 2026/27. 
5.  PROPOSALS  
5.1  The proposed capital plan for waste and recycling services for 2026/27 is shown below.
Page 102

Page 103

Capital Project  Cost Capital Classification
Domestic & Trade Waste bins £109,000 Core Project 
Domestic and Trade Waste Bins
5.2  Developers are recharged for the provision of bins to new build properties. In addition,
where bins are provided to commercial customers, or for the garden waste collection
scheme, the Council receives an income. It should therefore be noted that some of the
capital expenditure cost will be indirectly offset by the income allocated to the revenue
budgets. It should also be noted that with the application of a cap that the amount of
spend on bins will be reduced in 2026/27.  
5.3  The Council has a statutory responsibility to provide Household Waste and Recycling
Centres (HWRCs). The Council currently provides 5 HWRCs. In addition, the Council
provides 22 mini recycling centres located in strategic locations throughout Moray.  In
previous years a capital allocation has been made available to purchase new skips for
HWRC sites.  Due to the affordability, no capital allocation for skip replacement was
recommended for 2026/27.  Therefore, there is the potential that capital funds from the
capital allocation for domestic and trade waste bins may be needed to purchase skips.      
5.4 It should be noted that without a dedicated budget for skip replacement, the amount of
spend on replacement skips will be less in 2026/27. This could mean that certain skips do
not get replaced and consequently the ability to dispose of certain non-household
materials, such as wood or construction waste, may need to be withdrawn from HWRC
sites, even if on a temporary basis, in order to utilise skips for other materials.  
5.5 The proposed capital plan for open spaces in 2026/27 is shown below: 
Capital Project  Cost Capital Classification
Cemetery Provision in Moray
(Cemetery infrastructure)
£43,000 Core Project
Cemetery Provision in Moray
(Lossiemouth)
£87,000 Named Project
Cemetery Provision in Moray (Keith) £87,000 Named Project
Parks and Open Spaces Infrastructure £37,000 Core Project
Children’s Play Areas £117,000 Core Project
Total £371,000 
Cemetery Provision in Moray (Cemetery infrastructure)
5.6 These funds are used to address known low level and emerging issues within the Council
cemeteries.  A condition assessment of all cemeteries was undertaken in 2025/26 by the
Council’s Consultancy Team.  Whilst emerging issues will present themselves throughout
the year, these funds will be used to address the issues discovered through the condition
assessment.  It will not be possible to address all the issues so these will be prioritised in
accordance with the level of risk and the budget available.       
Cemetery Provision in Moray (Lossiemouth and Keith)
5.7 The Council’s approved cemetery strategy identified that future cemeteries will be
developed in Elgin, Lossiemouth and Broomhill, Keith.  The current life expectancy of
Lossiemouth and Broomhill cemeteries is circa 10 years.  These funds will be used to start
Page 103

Page 104

the initial preparatory work needed in developing an extension to these cemeteries.  Based
on experience of developing Elgin cemetery, it is likely that it will take 10 years to complete
the development of these cemeteries.   
Park and Open Space Infrastructure
5.8 The Council provides parks and open spaces across Moray. These sites see a significant
amount of use. A capital allocation is needed to address those infrastructure issues which
present a health and safety concern. Given the relatively low value of capital allocation,
the funds will be used to address emerging works which present themselves throughout
the year.   
Children’s Play Areas
5.9 The last year of the Scottish Government Grant for play area renewal was 2025/26.  For
2026/27 the capital allocation is solely Council funded.  Over the last few years
inflationary costs, as well market demands, have significantly increased the costs of the
play park equipment.  It is considered that the capital allocation for 2026/27 will not be
sufficient to cover the costs of a whole park renewal, as well as addressing known and
emerging issues that will inevitably occur. 
5.10 It is therefore proposed that following the annual independent play area assessment that
the capital allocation for 2026/27 will be used to address issues identified regarding
specific pieces of equipment, as well any emerging issues.  Priority will be based on such
factors as health and safety.  Given the limitations of the capital budget, this may result in
pieces of play equipment being disabled, or removed from site and not being replaced.   
Facilities Management
5.11 The facilities management section covers the Janitorial, Building Cleaning, Caretaker and
facilities functions at HQ/Annexe. The section has a capital allocation of £15K per year.
These funds are used to purchase tools and equipment for the services, such as cleaning
equipment. The funds are used on an emerging basis rather than a cyclical and planned
replacement programme.  
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  X
Policy and Legal X 
Financial X 
Risk X 
Staffing  X
Best Value and Transformation X 
Property X 
Information Communications Technology/Digital            X
Equalities. Social Inclusion and Economic Impact   X
Page 104

Page 105

Climate Change and Biodiversity Impact  X 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population 
6.3  Policy and Legal 
The Council in its capacity as a Burial Authority, under the Burial and Cremation (Scotland)
Act 2016, has a statutory duty for the provision of burial grounds within Moray. This
responsibility extends to ensuring sites are safe for people to use. 
Under Section 1 of the Refuse Disposal (Amenity) Act 1978, the council has a statutory
duty to provide facilities at which residents of the area may deposit their household waste
for disposal. This responsibility extends to ensuring sites are safe for people to use.  
6.4  Financial 
The costs are shown within the report. 
6.5  Risk 
There are risks associated with both not approving the proposed capital spend, as well as
potential limitations and implications resulting from the amount of capital allocation for
2026/27.  The risks include increased health and safety issues across Council assets,
reduced service provision at HWRC sites and the potential that burial capacity in the area
could be compromised within a few years.  
6.6  Staffing 
There are no staffing implications associated with the recommendations in this report as
work has been planned in line with budget provision.  
6.7  Best Value and Transformation 
Best value will be achieved through going through the appropriate procurement channels
for the works required.  
6.8  Property
Page 105

Page 106

Any implications regarding Property relating to this report pertain to the risk of the
deterioration of buildings or infrastructure due to inadequate levels of funding being
available to maintain sites.  
6.9  Information Communications/Technology/Digital 
There are no implications associated with the recommendations.  
6.10  Equalities, Social Inclusion and Economic Impact 
There are no implications associated with the recommendations.  
6.11  Climate Change and Biodiversity Impacts 
There are no climate change implications as a result of this report. Efforts are made to be
mindful of the carbon and biodiversity implications and where possible products are
sourced as local as possible, and where practicable, are made from recycled materials. 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with the Executive Director Economy,
Enterprise and Operations, Head of Operations and Environment, Chief Financial Officer,
Service Manager Legal Services, Open Spaces Manager, Waste Manager, Service Manager,
People Management, Equalities Officer and L Rowan, Committee Services Officer and any
comments made have been incorporated into the report.  
8.  BACKGROUND PAPERS  
8.1  None.   
Page 106

Page 107

Report to: Economic Development
and Infrastructure
Services Committee 
Meeting 
Date:
10 March 2026  
Report by: Executive Director Economy, Enterprise and Operations  
Author: Nicola Moss and
Beverly Smith
Contact
Email:
nicola.moss@moray.gov.uk 
beverly.smith@moray.gov.uk 
Subject: Operations and Environment and Growth, Planning and Climate 
Capital and Revenue Budget Monitoring to 31 December 2025 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to scrutinise and note the quarter three position of 2025/26
regarding Operations and Environment and Growth, Planning and Climate Revenue and
Capital budgets.  
1.2  This report is submitted to Committee in terms of Section III (A) (2) of the Council’s
Scheme of Administration relating to the consideration of Revenue and Capital budgets
and long term financial plans.  
2.  SUMMARY  
2.1  This report provides an update on the quarter three budgetary position 2025/2026 and
comments on variances for the Revenue and Capital budgets for the period to 31 
December 2025 regarding Operations and Environment and Growth, Planning and
Climate, Revenue and Capital budgets. 
3.  RECOMMENDATIONS 
3.1  It is recommended that Committee scrutinise and note the quarter three budget position
for 2025/2026. 
Nicola Moss, Head of Operations and Environment
Beverly Smith, Head of Growth, Planning and Climate (Chief Planning Officer)   
4.  BACKGROUND AND CONTEXT  
Item 12.
Page 107

Page 108

4.1  The Performance Management Framework 2020 (page 27) requires that progress against
Capital and Revenue expenditure and the Capital Plan is reported to the relevant Service
Committee.  Heads of Service have been tasked with reducing overspends and generally
reducing expenditure back in line with budget. 
4.2  Savings and increased charges to the Revenue budget were approved when the budget was set
by Moray Council on 26 February 2025 (paragraph 3 of the minute refers).  Updates have been
presented to the Council quarterly as part of the full budget monitoring.  
5.  QUARTER 3  REVENUE BUDGET PERFORMANCE  
5.1  Operations and Environment 
Quarter 3 (Q3) results are often impacted by timing issues, the detail of Q3 is set out in the
table below. 
5.2  The table below shows Operations and Environment Revenue Budget position for Q3
2025 / 2026.  
Service Area Annual
Budget
Q3 Budget Q3 Actual+
Committed
Variance 
£000s £000s £000s £000s
Environmental
Services
18,902 13,987 13,866 121
Roads and Fleet 3,727 2,682 2,538 144
Engineering
Design
1,034 755 807 -52
Harbours and
Transportation 
6,577 4,771 4,825 -54
Operations and
Environment -
Directorate
215 166 160 6
Operations and
Environment -
Efficiency
savings
-251 0 0 0
Operations and
Environment 
Admin / Support
/H&S
518 392 390 1
Total 30,722 22,753 22,586 166
Underspend 
5.3  Environmental Services 
The table below shows Environmental Services Revenue Budget information for Q3
2025/2026. 
Service
Area
Annual
Budget
Q3 Budget Q3 Actual +
Committed
Variance 
£000s £000s £000s £000s
Page 108

Page 109

Waste
Management
8,813 6,566 6,562 4
Open Spaces 1,855 1,407 1,380 27
Building
Cleaning and
Catering
8,233 6,013 5,923 90
Total 18,902 13,985 13,865 121
Underspend 
5.4  Waste is underspent in quarters 1 to 3 by £4K. Tipping income (£107K overspend), Trade Waste
income (£79K overspend) and Green Waste income (£29K overspend) are currently not
meeting target.  However, recycling net income is higher due to a favourable recycling market
(£92K underspend) and the income from Dallachy gas is above budget (£10K underspend). 
Fuel costs are also less than budgeted (£81K underspend) with a contributing factor to this
being the cessation of using the BOMAG compactor at Dallachy Landfill. 
5.5  Open Spaces are currently achieving an underspend of £27K over quarters 1 to 3. Income from
areas such as burials are currently below target (£61K overspend) but this could, at least in
part, be due to budget profiling and the situation will be monitored over the remaining quarter. 
This overspend has been offset by underspends in other areas such as staffing and property
costs over Open Spaces.  The impact of dealing with Storm Floris and Storm Amy has
impacted on the budgetary position with additional works to address tree damage still on-
going. 
5.6  Building Catering and Cleaning are currently underspent by £90K. The underspend over
quarters 1 to 3 has been achieved mainly due to underspend in staffing (£47K), an underspend
in materials and favourable income against the budget from the secondary school meals. The
situation will continue to be monitored throughout the remaining quarter. 
5.7  Savings position at Q3 2025/2026 
Red Saving not taken and won’t be achieved this year- if slipped into
future years details given
Amber  Saving not taken and uncertain if it will be achieved in full this year
Green Saving taken, or will be taken, in full 
Description Amount Posted  Balance Status* Reason for balance
Approved when
2025/2026 budget
set
£000s  £000s  £000s   
Waste
Management-
Dallachy
-630 0 -630  Capping undertaken
during Q1/Q2/Q3. 
Review of budgets to
follow in Q4 to
establish saving
figure to be posted.  
Waste Management
– Reduce HWRC
(Household Waste
-50 -22 -28  Original template
suggested a number
of sites would close
Page 109

Page 110

Recycling Centre)
opening hours 
(close 1 weekday)
but this proposal was
reduced. Full saving
will not be met.
Waste
Management-
Close Dallachy
HWRC
-10  -10 0  N/A
Waste
Management-
Dallachy Closure
-30 0 -30  To be reviewed along
with £630k above in
Q4
Open Spaces – full
cost recovery from
HRA (housing
revenue account) of
inspection of play
areas
-28 -18 -10  £18k taken in Q2. 
£10k currently being
retained.   
5.8  Roads Maintenance and Fleet Services
The table below shows Roads and Fleet Revenue Budget information for Q3 2025/2026. 
Service
Area
Annual Budget Q3 Budget Q3 Actual +
Committed  
Variance 
£000s £000s £000s £000s
Roads
Management
5,230 3,747 3,832 -85
Fleet Services  1,503 1,066 1,294 228
Total 6,733 4,813 5,126 -144
Underspend 
5.9  The projected £85K overspend at Q3 within the roads management budget relates to works
that have been identified for repair and show as committed against the budget. Not all of
these works will be completed to date and some will be work in progress. This will be closely
monitored through to year end Q4 to ensure no overspend occurs. 
5.10  There is currently a reported £228K over recovery within fleet services. This relates to timing of
internal fleet charges against service budgets. The recharges are currently being reviewed to
ensure over recovery is accounted for. 
5.11  Savings position at Q3   2025/2026 
Red Saving not taken and won’t be achieved this year- if slipped into
future years details given
Amber  Saving not taken and uncertain if it will be achieved in full this year
Green Saving taken, or will be taken, in full 
Description Amount Posted  Balance Status* Reason for balance
Page 110

Page 111

Approved when
2025/2026 budget
set
£000s  £000s  £000s   
Roads Management
– Roads
Maintenance hire
out of machinery
-50 0 -50  New machine was
late arriving due to
supply chain issues.
Initial Interest from
other LA’s has not
materialised to date.
Fleet – Lease
Specialist Vehicles 
-76 0 -76  It is unlikely that this
will achieve savings
this financial year but
a full review is in
progress.
Roads Management
– Gully Cleaning
-50 0 -20  £30k of the saving
will be achieved
25/26. The remaining
£20k will be taken
26/27.
Roads Management
– Street Lighting
-50 -42 -8  Small variance,
however £42k saving
achieved to date.
Fleet – Restructure
DAR 
0 -24 24  N/A    
5.12  Design Consultancy
The table below shows Design Consultancy Revenue Budget information for Q3 2025/2026.
Annual Budget Q3 Budget Q3 Actual + 
Committed
Variance
£000s £000s £000s £000s
1,034 755 807 52 
5.13  The revenue budget for Engineering Design shows a £52k overspend, this principally relates to
the rate of recharging staff time to capital and early spend on infrastructure maintenance. At
this stage the team is forecasting an overspend of approximately 7% at year end, which is due
to staff vacancies and maternity leave reducing the staff time that can be recharged to capital
works and works for other sections within the council. 
5.14  Harbours and Transportation 
The table below shows Transportation and Harbours Revenue Budget information for Q3
2025/2026. 
Service
Area
Annual Budget Q3 Budget Q3 Actual +
Committed
Variance 
£000s £000s £000s £000s
Harbours and
Traffic and
Transportation
Management
6,577 4,771 4,825 -54 
Overspend 
Page 111

Page 112

5.15  There is an overall overspend of £54K at the end of Q3. The spend profile for the remaining
quarter will be monitored with a view to balancing this at year end, noting income in some
areas such as Car Parks is not meeting expectations.  More spend than anticipated was
required for energy costs, recovery transport and equipment costs as a result of driver
recruitment.  
5.16  Growth, Planning and Climate
The table below shows Growth, Planning   and Climate Revenue Budget information for Q3
2025/2026. 
Service
Area
Annual Budget Q3 Budget Q3 Actual +
Committed
Variance 
£000s £000s £000s £000s
Economy and
Enterprise
923 1,650 1,478 172
Strategic
Planning and
Development
122 13 18 -5
Moray Growth
Deal
151 219 219 0
Total 1,163 1,043 1,040 167 
5.17  The Q3 variance in Growth, Planning and Climate consists of 25-26 allocation received by
Economy & Enterprise for the Coastal Communities Fund.  The award will be allocated to an
ear-marked reserve for use in future years. 
5.18 The £163k of savings for Growth, Planning and Climate were set out in previous quarters and
100% achieved. No further savings were taken in Q3. 
CAPITAL BUDGETS 
5.19 Environmental Services   
Project Capital 
Budget
2025/26
Actual 
Expenditure
Q3
Forecast
Q3 
Actual
Q3
Variance 
£000s £000s £000s £000s £000s
Waste Mgt     
Dallachy
Landfill site
final capping
1,368  1,025 380 65 315
Upgrade
Recycling
Centres
(building)
40 12 0 0 0
Upgrade
Recycling
25 25 0 0 0
Page 112

Page 113

Centres 
(equipment)
Domestic
and Trade
Waste Bins
63 -17 52 6 46
NESS Energy
from Waste 
150 29 24 0 24
Open
Spaces     
Cemetery
Provision in
Elgin
3,439 1,838 2,375 1,315 1,060
Cemetery
Provision in
Moray
30 6 0 0 0
Parks and
Open
Spaces
Infrastructur
e 
25 14 0 14 -14
Children’s
Play Areas 
(Scottish
Government
funded)
659 245 225 39 186
Facilities     
Facilities
Management
Equipment
9 6 2 3 -1
TOTAL 5,808 3,183 3,058 2,771 1616 
5.20  The final capping works at Dallachy were concluded in Q2. However, whilst the actual works
may be completed, there are still outstanding payments to the contractor which need to be
finalised and paid. The overall works will be within the full year budget. 
5.21  The upgrade of the recycling centre primarily relates to upgrading the access and vehicle
parking at Moycroft. The land has now been purchased, and the waste service is in
correspondence with Transportation on the design works for the access. It is currently
estimated that construction works will take place in quarter 4 of 2025/26. 
5.22  New skips have been purchased for the HWRC sites using the available budget.  The remaining
budget for purchasing domestic and trade bins will be spent in the remaining quarter 4 of
2025/26.   
5.23  The construction work for Elgin Cemetery is on track for completion by February 2026.  The
delay in part has been due to adverse weather conditions.  Construction of the burial areas
have been completed, with infrastructure such as the road still requiring completion.  This will
allow for a 12 month period for settlement before the cemetery is required for burials
Page 113

Page 114

(currently projected to be circa quarter 4 of 2026/2027).  The underspend in quarter 3 is a
combination of delays in billing and value engineering exercises. 
5.24   As previously reported to this Committee on 29 April 2025, due to the incorrect application of
capping at the beginning of the financial year, there was no budget allocation for the cemetery
provision in Moray or parks and open spaces infrastructure.  This was addressed by Finance in
quarter 3 (December 2025), and there will be a reinstatement of the budget for Q4.  The budget
will then be used to address the small amount of spend currently showing in the cemeteries
and parks and open spaces budgets.  
5.25  The upgrade of the play areas is on track in accordance with the planned scheduled. Further
spend will be incurred in quarter 4.  Whilst orders will be committed in 2025/26, installation
timelines will mean that completion of the main play areas scheduled for an upgrade in
2025/26 will be completed in 2026/27.  
5.26  The budget for Facilities is used to replace equipment needed for service delivery, such as
replacement hoovers, scrubbers. It is anticipated that the full budget will be spent by the end
of quarter 4. 
5.27  Roads Maintenance and Fleet Services Capital   
Project Capital
Budget
2025/
2026
Actual 
Expenditure
Q3
Forecast
Q3
Actual
Q3 Variance 
£000s £000s £000s £000s £000s
Roads
Improvements     
Carriageway
resurfacing/
reconstruction
/ surface
dressing
2,465 2,357 195 366 -171
Drainage and
other works
270 169 33 124 -91
Footways  50 36 0 7 -7
Street Lighting     
Street Lighting  522 453 0 112 -112
Fleet     
Vehicle
Replacement
Programme
2,362 1,505 487 266 221
MOT Spend to
Save 
49 49 0 0 0
TOTAL 5,718 4,569 715 875 -160
Overspend 
Page 114

Page 115

5.28  There is a £171k overspend variance against the carriageway resurfacing/reconstruction and
surface dressing budget. This variance is attributed to accelerating the programme delivery
and completing works in better weather. Programmes of work for the total budget of £2,465m
have been developed and communicated and it can be reported with confidence that this
budget will be fully spent at end of Q4. 
5.29  Within the drainage and other works budget, there is a variance of £91K. The total expenditure
to date is £169K against a budget allocation of £270K. It is projected that total budget will be
spent at end of Q4. 
5.30  The footway budget is reporting a £7K overspend at Q3. One of the identified schemes has
been completed earlier, in conjunction with a carriageway scheme. It is projected the £50k
budget will be spent at the end of Q4. 
5.31  The street lighting column replacement budget is reporting an overspend variance of £112k.
The programme has been accelerated to make use of the summer weather. Resources will be
diverted onto revenue maintenance repairs and annual testing programme during the winter
months. It is not predicted to overspend at year end. 
5.32  The vehicle replacement programme is reporting an underspend at Q3 of £221K. this is
attributed to delays in vehicles that have been ordered but not arrived from suppliers due to
build delays. The MOT spend to save works have been completed to budget.  
5.33  Design Consultancy Capital (including Harbours Infrastructure) 
Project Capital 
Budget
2025/26
Actual
Expenditure
Q3 
Forecast
Q3 
Actual
Q3 
Variance 
£000s £000s £000s £000s £000s
Bridges     
A941/340 New
Bishopmill
Bridge
420 203 411 193 218
B9015/30
Sourden
0 0 0 0 0
U57H/11 South
Arndilly
0 0 0 0 0
Removal of
Footbridges
0 0 0 0 0
Blackhills
Culvert
335 365 0 1 -1
Sanquhar Loch
Footbridge
0 0 0 0 0      
Road
Improvements     
B9016 Landslip
Repair
65 4 62 1 61
C1H Landslip 345 95 250 86 164
Glenlivet 70 20 52 2 50
Page 115

Page 116

15 Main St
Buckie retaining
wall
30 17 13 0 13
Buckie North
Street Wall
150 88 113 51 62
Landslip
Feasibility
Studies
23 15 0 5 -5
A939 Landslip
Creag
Chalcaidh
Quarry
175  137 0 0 0      
Flood Risk and
Coastal Mgt     
Coastal
Adaption Plan
20 0 19 0 19
Coastal
Adaption Plan –
Real Time
Monitoring
102 81 45 23 22
Anti Tank
Assessment
36 1 18 1 17
Project Capital
Budget 
2025/26
Actual
Expenditure
Q3
Forecast
Q3 
Actual
Q3
Variance 
£000s £000s £000s £000s £000s
Lossiemouth
Christmas
Trees- Phase 2
19 4 4 3 1
Development of
Simple
Assessment
Guide
23 14 12 3 9
Cullen Seawall
assessment
75 97 75 0 75
Millbuies
drawdown
75 0 57 0 57
Findhorn
Coastal Erosion
10 10 0 0 0      
Harbours     
Navigation Light
Buckie Harbour
125 109 0 0 0
West Pier
Buckie Harbour
0 0 0 0 0
Buckie
Weighbridge
22 21 1 0 1
Pier 1 joints 124 17 93 1 92
Page 116

Page 117

Harbour Capital
life expired
357 315 166 208 -42
Pontoons  33 17 22 5 17
Portknockie
Middle Pier
Design
35 17 22 5 17
Cullen Viaduct
repairs
2 2 0 0 0
Cullen West
Pier
49 0 0 0 0 
TOTAL    2,720  1,649  1,406  717  689 
5.34  There is an overspend of £2,000 for the bridges capital projects.  The timing of other projects is
being adjusted along with managing underspends from other schemes in order to deliver a
balanced outcome at year end. 
5.35  Transportation Capital - The table below shows Transportation Capital Budget information
for 2025 /2026. 
Project Capital
Budget
2025/
2026
Actual
Expenditure
Q3
Forecast
Q3 
Actual
Q3
Variance 
£000s £000s £000s £000s £000s
Car Parks     
Multi-storey
car parks
530 456 117 43 74
Car Parks 7 0 0 0 0
Car Park
Capital 
Improvements
22 16 0 16 -16
Traffic     
Road Safety
Provision
70 13 50 3 47
Disability
Adaptions
40 38 8 20 -12
New Road
Signs and
Markings
45 21 22 3 19
Traffic data
Collection
Equipment
20 27 15 23 -8
Traffic Signal
Replacement
72 15 45 1 44
Active Travel     
Active Travel 500 111 237 3 234      
TOTAL 1,299 697 494 112 382
Page 117

Page 118

5.36  The variance against Car Parks Improvements is due to spend occurring earlier in Q3 as
opposed to in Q4.  For Road Safety Provision the opposite is true, with a reprofiling of spend
from Q3 to Q4. 
For Disability Adaptions, more works took place in Q3 with less now planned in Q4. For Signs
and Markings, works took place in Q3 as planned and are complete. This is an invoicing issue
which will be reconciled for Q4. 
For Data Collection Equipment, there was a £7K overspend in Q3 and no remaining budget in
Q4. Officers will utilise underspend in Traffic Signals Replacement to mitigate this. 
For Active Travel, agreement has been reached with Transport Scotland to carry forward
element of this grant funding. This is for Rothes Way, with match funding for Levelling Up Fund
(LUF). 
In all cases, it is projected that total budget lines will be spent at end of Q4. 
Growth, Planning and Climate Capital Budget 
5.37  Economy and Enterprise Capital – The table below shows Economy and Enterprise Capital
Budget information for 2025/2026 
Project Capital
Budget
2025/
2026
Actual
Expenditure
Q3 
Forecast
Q3 
Actual
Q3
Variance
Funded
Spend
£000s £000s £000s £000s £000s
Town Centre
Initiative
Fund (match
funding FCHS) 
Forres
Conservation
& Heritage
Scheme
304 0 0 0 0
PBIF Place
Based
Investment
(match
funding for
FCHS)
202 0 0 0 0
TOTAL 506 0 0 0 0 
5.38  Forres Conservation and Heritage Scheme (FCHS) is a 5-year delivery programme and no
spend is forecast in 2025/2026. Capital spend will commence on delivery of projects. 
Page 118

Page 119

5.39  Moray Growth Deal – The table below shows Moray Growth Deal Capital Budget information
for Q3 2025/2026. 
Project Capital
Budget
2025/
2026
Actual
Expenditure
Q3 
Forecast
Q3 
Actual
Q3
Variance 
£000s £000s £000s £000s £000s
Moray Growth
Deal
10,855 3,630 2,112 1,126 986 
5.40  Underspend variance predominantly due to two main issues:  
- Cultural Quarter:  Budget allocation was set when the construction procurement
tender was live for Elgin Town Hall.  The tender process elongated due to the use of the
NEC contract x22 clause and the contractors cash flow plan was not available until Q4.  
- South Street:  Legal activity between partners has taken longer than anticipated,
delaying the start date for construction activity and the ability to draw down funding.  All
parties working to sign contracts early February with construction starting in March. 
6.  SUMMARY OF IMPLICATIONS 
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  X
Policy and Legal  X
Financial            X 
Risk           X 
Staffing  X
Best Value and Transformation  X
Property  X
Information Communications Technology/Digital  X
Equalities. Social Inclusion and Economic Impact  X
Climate Change, Biodiversity and Sustainability  X 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
Page 119

Page 120

b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population 
6.3  Policy and Legal 
There are no policy or legal implications arising directly from this report.  
6.4  Financial 
The financial implications are highlighted within the report. 
6.5  Risk 
Budget managers are aware of their responsibilities for managing budget allocations and
approval for variance will be sought from Committee in line with the Financial Regulations.  
6.6  Staffing 
There are no staffing implications arising from this report.  
6.7  Best Value and Transformation 
There are no Best Value and Transformation implications arising from this report.  
6.8  Property 
There are no Property implications arising from this report.  
6.9  Information Communications/Technology/Digital 
There are no Communications/ Technology/Digital arising from this report.  
6.10  Equalities, Social Inclusion and Economic Impact 
There are no equalities implications arising from this report because the report informs the
Committee on budget monitoring. Any identified savings proposals referenced in the repot
will be subject to an individual integrated impact assessment (IIA) to identify any specific
impacts where relevant.  
6.11  Climate Change and Biodiversity Impacts 
There are no climate change or Biodiversity impacts arising from this report. Achieving net
zero will have significant implications for future planned capital expenditure. 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with Executive Director Economy, Enterprise
and Operations, Head of Operations and Environment, Head of Growth, Planning and
Climate (Chief Planning Officer), Chief Financial Officer, Service Manager Legal Services,
Equalities Officer, Service Manager Democratic Services, Service Manager, People
Management, Operations and Environment Management Team and Budget Managers.  Any
comments have been taken into consideration. 
8.  BACKGROUND PAPERS
Page 120

Page 121

8.1  None. 
Page 121

Page 122

Page 122

Page 123

Report to: Economic Development and
Infrastructure Services
Committee 
Meeting
Date:
10 March 2026  
Report by: Executive Director Economy, Enterprise and Operations  
Authors: Dr. Rod Lovie
Tilia Maas Geesteranus 
Contact
Email:
Rod.lovie@moray.gov.uk 
Subject: Routemap to Net Zero and Climate Change Update 2024-2025 
1.  PURPOSE 
☒For Decision      ☐  For Information 
1.1  The purpose of this report is to ask the Council to consider and approve the 2024/25
Routemap to Net Zero and Climate Change Update. This update provides insight into
current performance, identifies key barriers to progress, and outlines next steps necessary
to keep the Council on a viable pathway to net zero.  
1.2  This report is submitted to Council in terms of Section III (F) (33) of the Council’s Scheme
of Administration relating to providing, developing and monitoring the Council’s Economic
Development and Infrastructure Services. 
2.  SUMMARY  
2.1  The Council’s Climate Change Strategy 2020-30 sets out how the Council will respond to
its statutory duties to mitigate carbon emissions, improve community adaptation and
resilience, and to embed sustainable principles at every level of its operations. An update
on the progress of this strategy is provided annually by the Routemap to Net Zero and
Climate Change Update. 
2.2 A draft of the update with the latest set of carbon emission data from 2024/25 is included
in Appendix 1. This report provides details on changes in the Council’s recorded carbon
emissions, provides an overview of our current actions, and provides a look ahead via our
current emissions pathway. A summary of this document is included in Appendix 2. 
Item 13.
Page 123

Page 124

2.3 During financial year 2024/25, reductions in carbon emissions were achieved in several
operational areas which include buildings and waste. The report highlights that emissions
have reduced by 7.7% since last year. However, although these numbers look promising,
some of the largest emission sources remain stagnant. The agreed policy position in the
Climate Change Strategy is that external funding is required to progress climate change
actions so officers are actively seeking funding opportunities. 
2.4 During a busy year, energy consumption in Council buildings has decreased by 4%,
additional solar panels, EV pool cars and EV charging points are saving the Council carbon
and money. A final version of the update to the Council’s Climate Change Strategy is due
to be presented to Council in May 2026. This will set carbon budgets rather than interim
targets and align Council aspirations with Scottish Government net zero targets. 
3.  RECOMMENDATIONS  
3.1  It is recommended that the Committee:   
i)  approves the annual Climate Change Plan and Routemap to Net Zero update,
as detailed in Appendix 1 and 2; 
ii)  welcomes the over 7% reduction in recorded emissions since 2023-24; and 
iii)  notes that a final version of the Council’s Climate Change Strategy is planned
to be presented to Council in May 2026, outlining a way forward with
consideration to the issues raised in this report.   
Dr. Rod Lovie
Principal Climate Change Officer 
Tilia Maas Geesteranus
Climate Change Strategy Officer 
4.  BACKGROUND AND CONTEXT  
4.1  Climate change is a significant and escalating threat to Moray’s natural environment,
people and economic wellbeing. The impacts of climate change are already being felt.
These will continue to worsen, posing major challenges for both current and future
generations, ecosystems, infrastructure and key sectors including food and drink,
agriculture and tourism. 
4.2  The Climate Change (Scotland) Act 2009 requires the Council to respond to these
challenges by reducing greenhouse gas emissions, adapting to the changing climate, and
to act in a way considered most sustainable. The Council must report on compliance with
these duties annually.  
4.3  On 27 June 2019, the Council declared that climate change is an ecological emergency
and that it needs to take action to reduce carbon emissions (para 6 of the Minute refers).
Page 124

Page 125

Furthermore, on 2 February 2023 (para 9 of the Minute refers), the Council declared a
nature emergency which recognised the value and role of nature in achieving climate
targets, maintaining a strong economy and protecting the health and wellbeing of future
generations.  
4.4  The Council approved its Climate Change Strategy on 10 March 2021 (para 13 of the
Minute refers). An update on the progress of this strategy is provided annually by the
Routemap to Net Zero and Climate Change Update. This report provides an update for the
2024/25 financial year. 
4.5  On 24 September 2025 (para 12 of the Minute refers) Council approved the draft update of
the Climate Change Strategy (CCS) and agreed that the draft strategy be subject to public
consultation for a period of 12 weeks. The Climate Change Strategy sets out how the
Council will respond to its statutory duties to mitigate carbon emissions, improve
community adaptation and resilience, and to embed sustainable principles at every level
of its operations. It was also restated that implementation of the strategy shall be
undertaken within the limits of existing Revenue and Capital resources, with no additional
Council funding allocated beyond approved budgets, and that officers should continue 
to pursue opportunities for external funding. 
5.  OVERVIEW AND NEXT STEPS  
5.1  The Routemap to Net Zero and Climate Change Update 2024-2025 is included as
Appendix 1, and a summary is included as Appendix 2. Key findings include:
• Operational emission reductions in several areas;
• Continued slow rates of emissions reduction from buildings and fleet, the Council’s
two highest emitting sectors; and for commuting. The latter is beyond the direct
control of the council and difficult to change.
• Continuing engagement with external funding and strategy alignment, notably via
the Scottish Government’s North East Just Transition Fund.  
5.2  Since reporting year 2023/24, there has been an 7.7% decrease in the Council’s
emissions. These are largely the result of a reduction in fuel oil / kerosene use and gas for
heating, and a change in the treatment of municipal waste which now goes to the NESS
Energy from Waste facility in Aberdeen. Compared to the last reporting year there has
been an increase in diesel usage of 6.5%. This could be from a number of factors including
new housing develpments being serviced, additional mileage from Bus Revolution,
extreme weather conditions, and decisions not to replace fleet vehicles at an optimal
replacement age has led to an ageing fleet with less fuel-efficient vehicles 
5.3  Energy consumption from the Council’s buildings for 2024/25 was 37,461,982 kWh, which
is just over a 4% decrease compared to the previous year. The reduction in the burning of
fuel oil / kerosene for heat has seen emissions fall by 206 tCO2e between reporting year
2023/24 and reporting year 2024/25. This is primarily due to less down time of biomass
boilers as kerosene is used as a backup heat source. The subsequent increase in
woodchip and wood pellets has led to an increase of around 1.4 tCO2e giving a
substantial overall saving in emission. 
Page 125

Page 126

5.4  Solar PV projects on the rooftops of Ashgrove Depot, Council HQ, HQ Annexe and Elgin
Library are now complete and have saved almost £12,000 in electricity costs in their first
year. The Council’s solar PV projects generated 53,616 kWh of renewable electricity in
2024/25. This represents an increase of 4% in renewable energy generated compared to
2023/24. 
5.5  In 2025, 9 EV charging points were installed in Rose Cottage car park and 6 diesel pool
cars were replaced with 6 electric vehicles. This resulted in CO₂ emissions reduced by
approximately 11.5 tons annually; fuel savings of £5,000 per year; maintenance costs
reduced by 75%; while vehicles met all performance requirements. The replacement was
based on a feasibility study around the demand for more EVs, availability of power at the
location, and a spend to save approach - where the lifetime costs are less than similar
sized diesel vehicles.  
5.6  The national shift from annual emissions targets to legally binding multi-year carbon
budgets represents a significant change in national policy framework. These carbon
budgets provide a more stable and realistic basis for planning, replacing year-on-year
targets that were vulnerable to short-term fluctuations. The Council can contribute to
these targeted reductions by adopting its own carbon budgets in the updated Climate
Change Strategy. The Council’s current actions align with the first carbon budget period,
however, steeper reductions will be required in subsequent periods to remain within future
budgets and achieve net zero by 2045. 
5.7 Looking ahead, there are significant opportunities which could allow the Council to make
such progress. Officers are engaged in work to develop projects for inclusion in a bid to the
Scottish Government’s £500m North East Just Transition Fund, as well as future Salix
funding opportunities. Realising such opportunities will require cross-service
collaboration, capacity building and sustained support to unlock further funding. 
5.8 The Scottish Government’s Just Transition Fund, launched in 2021, is a £500m ten-year
commitment to support projects in the North East which contribute towards a just
transition away from carbon-intensive industries. The fund represents a significant
economic opportunity for Moray with the potential for the creation of jobs, support for
innovation and enterprise, and the development and maintenance of a skilled workforce.
Work has been continuing both to develop a cohesive bid for Moray to the fund and lobby
for a fare share of this fund to go to Moray. On 28 January 2026 (para 9 of the Minute refers)
Council approved a Just Transition Fund Project Shortlist and agreed to progress the
proposed shortlist of projects. 
5.9 The Council has continued to increase knowledge around climate risk by producing an
adaptation benchmarking report and a local climate impact profile (LCLIP). The Council
has successfully leveraged grant funding for coastal adaptation works and new
community resilience plans. In addition, the proposed Moray Nature Network was
completed in early 2025, providing strategic direction to restore nature connectivity on a
region wide scale. Connecting people to nature is at the heart of this work, through local
volunteering opportunities. Invasive species management, wildflower areas, and habitat
Page 126

Page 127

restoration contribute to both mitigation and adaptation outcomes, contributing to
resilience against extreme weather events. Scotlands National Adaptation Plan (SNAP 3)
was published in September 2024, informing the development of the Council’s approach
to adaptation. Notably, SNAP 3’s first outcome is Nature Connects, reinforcing the
Council’s current approach to closely align biodiversity with wider climate action. Funding
from the Nature Restoration Fund will allow new works in council land to progress
including biodiversity in school grounds, and biodiversity works in parks and wildflower
areas to continue.
5.10 Appendix 2 summarises the Climate Change Plan and Routemap to Net Zero report. It
highlights changes in carbon emissions, adaptation, sustainability, and provides case
studies of council projects.
6. SUMMARY OF IMPLICATIONS
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed:
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) X
Policy and Legal X
Financial X
Risk X
Staffing X
Best Value and Transformation X
Property X
Information Communications Technology/Digital   X
Equalities. Social Inclusion and Economic Impact X
Climate Change and Biodiversity Impact  X
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans.
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in Moray.
Page 127

Page 128

☒ Empowering and connecting communities.
☒ Improving wellbeing of our population 
6.3  Policy and Legal 
The Council is required to act on a variety of statutory duties related to climate change. 
Climate Change (Scotland) Act 2009 places a duty on public bodies to act in the way best
calculated to contribute to the delivery of Scotland’s climate change targets; in the way
best calculated to help deliver any programme for climate change adaptation laid before
the Scottish Parliament; in a way it considers most sustainable. 
Local Government in Scotland Act 2003 places Best Value duties on the Council which
include contributing to the achievement of sustainable development through continuous
improvement in performance. 
Nature Conservation (Scotland) Act 2004 places a duty on the Council to consider
biodiversity in its decision-making processes and to promote the conservation of local
habitats and species. 
Local Heat and Energy Efficiency Strategies (Scotland) Order 2022 requires the Council to
develop plans to improve energy efficiency and reduce carbon emissions in buildings
across Moray. 
Heat Networks (Scotland) Act 2021 requires the Council to develop plans to improve
energy efficiency and reduce carbon emissions in buildings across Moray. 
Planning (Scotland) Act 2019, through National Planning Framework 4 (NPF4),
incorporates national climate change targets into the local planning system to promote
sustainable development, and consider carbon, biodiversity and climate change impacts
throughout the planning process. 
In addition, climate change is increasingly being embedded in all government policies
ranging from infrastructure delivery to energy policy, and these are likely to influence the
Council’s work moving forward.  
6.4  Financial 
There are no financial implications arising from this report, however there are significant
difficulties in funding the necessary work from existing resources. The Zero Emission
Fleet Replacement Strategy details the Council’s plans to decarbonise the remainder of
the fleet in line with the Scottish Government’s net zero targets. However, funding these
plans is a challenge and a spend to save case is being worked on. Additional external
funds are required if the Council is to deliver its plans for decarbonisation and adaptation
across the organisation. Although there are significant challenges to fund
decarbonisation actions, there are significant opportunities to lever in funding for these,
as recognised in this report. However, in house resources are needed to support bids as
Page 128

Page 129

many funding streams do not provide capacity funding or resource for project
management. 
6.5  Risk 
Climate change is a serious risk to the Council’s service provision. It poses significant
risks to our health, our economy, our environment and endangers the wellbeing of current
and future generations. 
There is a risk that the Council’s target of net zero by 2045 will not be met if plans to
progress the actions within the Climate Change Strategy are not progressed at pace and if
external funding is not secured to progress such plans.  
6.6  Staffing
Insufficient internal capacity and funding may delay key projects or opportunities to
leverage funding. 
Groundwork to strengthen the Council’s position for advancing decarbonisation projects
and external funding is principally led by officers in Strategic Planning and Development,
with support from officers in Housing and Property and Transportation. These services are
under significant workload pressures associated with Climate Change Duties, Local
Development Plan, Moray Growth Deal, Levelling Up Fund, and Elgin Neighbourhood
Board. Staffing resource is needed to prepare funding bids and for project management of
many external funds. Therefore, internal resources have a close bearing on success in
leveraging in external funding to enable ambitions to be realised. 
Additional resourcing was agreed by the Council on 26 February 2025 for a Grade 11
Senior Project Officer to be employed for a 2-year period to lead and oversee the delivery
of a selection of projects within the Climate Change Strategy, ensuring the effective
governance, management and allocation of budget. Initially the projects will include
decarbonising council assets, as well as progressing spend-to-save and Just Transition
Fund opportunities.  
6.7  Best Value and Transformation 
Contributing to the achievement of sustainable development through continuous
improvement in performance is a key component of the Council’s Best Value duties set
out by the Local Government in Scotland Act 2003. Achieving sustainable development
means meeting the needs of the present without compromising the ability of future
generations to meet their own needs. 
The Council has now published an initial Sustainable Development Statement in line with
its Best Value duties. This will be updated as part of the Climate Change Strategy review
process.  
6.8  Property 
The development of decarbonisation projects will impact on corporate buildings, council
landholdings and the learning estate. 
Page 129

Page 130

As agreed by the Council in the case of natural capital projects, any landholdings
identified as potentially suitable for change will be assessed on a case-by-case basis in
collaboration with key stakeholders. If any proposed improvements would lead to change
of use of common good land, then this would be subject to a statutory public consultation
under S104 of the Community Empowerment (Scotland) Act 2015 to ensure community
support for the proposals.  
6.9  Information Communications/Technology/Digital 
No implications arising from this report.  
6.10  Equalities, Social Inclusion and Economic Impact 
Climate change will impact on every service area of the Council. By considering climate
change across services, it is possible to deliver positive equalities and socio-economic
impacts. Climate action is integral in progressing the Council’s corporate priorities of
tackling poverty and inequality, building a stronger greener economy, and building thriving,
resilient, empowered communities. 
Climate change will lead to more extreme weather events in Moray which will have a
disproportionate impact on those already in poverty or with the inability to adapt to this
change.  
6.11  Climate Change and Biodiversity Impacts 
This report focuses attention on the actions required to ensure that the Council meets its
statutory obligations and targets. Reducing carbon emissions, restoring nature and being
ready for climate impacts are necessary steps to act on the climate and nature emergency
and show local leadership. 
7. CONSULTATION  
7.1  This report has been prepared in consultation with the Executive Director Economy,
Environment and Operations, Chief Financial Officer, Chief Governance Officer, Head of
Growth, Planning and Climate, Head of Operations and Environment, Head of Housing,
Property and Communities, Head of Education, Service Manager Roads and Fleet, L
Rowan, Committee Services Officer, Energy Officer, and the Equal Opportunities Officer
and any comments made have been incorporated into the report 
8. BACKGROUND PAPERS    
None 
Page 130

Page 131

Clim
ate Change Plan
and
Routem
ap to Net Zero
2026 update
M
oray Council Clim
ate Change Strategy 2020-2030
Appendix 1
Page 131

Page 132

Contents 
Executive Sum
m
ary
1
W
hy we are taking clim
ate action
action
2
How
we approach
clim
ate action
3
Reducing Council Em
issions
3.1
Building Heat and Electricity
3.2
Fleet
3.3
W
aste
3.4
Operational Activities
3.5
Procurem
ent and Investm
ent
4
Adapting to Clim
ate Change and Restoring
Nature
4.1
Adaptation
4.2
Biodiversity, nature and carbon sequestration
5
Sustainable Developm
ent and W
ider Influence
5.1
External Influence
5.2
Sustainable Developm
ent
6
W
here are we going
6.1
Pathway to net zero and carbon budgets
6.2
Being ready for clim
ate im
pacts
6.3
Restoring Nature
6.4
Sustainable Developm
ent
7
Conclusion
8
Glossary
Climate Change Plan and Route Map to Net Zero 2026 update
1 3 8 14 15 19 22 25 28 29 29 32 35 35 40 41 41 43 44 45 46 47
Page 132

Page 133

From
coastal erosion and flooding, to wildfires and power outages,
severe weather events in M
oray are becom
ing ever m
ore frequent
and disruptive to people’s lives and Council services. Building on
its clim
ate em
ergency and nature em
ergency declarations, the
Council is com
m
itted to achieving net zero em
issions, taking action
to adapt to clim
ate im
pacts and restoring biodiversity in line with
Scottish Governm
ent targets. 
In 2024/25, the Council’s recorded carbon em
issions were 17,055
tonnes of carbon dioxide (tCO2e); a decrease of 1,414 tCO2e (7.7%)
com
pared to reporting year 2023/24. 
Significant progress has been m
ade in building energy effi
ciency,
fleet decarbonisation, and waste m
anagem
ent, including: 
Buildings: Closure and consolidation of offi
ces, sm
arter
working practices, LED
lighting upgrades, and solar PV
installations now
generate over 53,000 kW
h of renewable
electricity annually. Fuel oil use has fallen by 57%
since 2017/18,
while biom
ass system
s and im
proved heating controls have
contributed to further reductions. 
Fleet: Over 67 electric vehicles are in operation, supported by
staff
e-bike availability, helping cut diesel use and lower
operational costs. 
W
aste: Transition to the NESS Energy from
W
aste facility has
dram
atically reduced landfill em
issions, com
bined with a high
recycling rate.
1
Climate Change Plan and Route Map to Net Zero 2026 update
Though these num
bers look prom
ising, som
e of the largest
em
ission sources, such as building heat, fleet and staff
com
m
uting,
rem
ain stagnant or are heavily dependent on external funding. 
The Council has continued to increase knowledge around clim
ate
risk by producing an adaptation benchm
arking report and a local
clim
ate im
pact profile (LCLIP). The Council has successfully
leveraged grant funding for coastal adaptation works and new
com
m
unity resilience plans. 
M
oray’s clim
ate preparedness will require nature-based solutions
to protect people, infrastructure and nature. The proposed M
oray
Nature Network was com
pleted in early 2025, providing strategic
direction to restore nature connectivity on a region wide scale.
Connecting people to nature is at the heart of this work, through
local volunteering opportunities. Invasive species m
anagem
ent,
wildflower prom
otion, and habitat restoration contribute to both
m
itigation and adaptation outcom
es, contributing to resilience
against extrem
e weather events. 
Clim
ate action delivers m
ultiple positive outcom
es: 
Econom
ic: Investm
ent in low-carbon infrastructure and green
skills creates local jobs, supports and develops new
local supply
chains, and reduces long-term
operational costs across various
sectors.
Executive Sum
m
ary
Page 133

Page 134

Social: M
easures have potential to im
prove public health, tackle
fuel poverty, and enhance access to nature and active travel
options. 
Environm
ental: Reduced em
issions, enhanced biodiversity,
and sustainable land m
anagem
ent support long-term
resilience
and wellbeing. 
M
oray Council is com
m
itted to achieving net zero by 2045, guided
by the Scottish Governm
ent’s newly introduced five-year carbon
budgets. By continuing to im
plem
ent energy-effi
cient solutions,
expand renewable energy, restore nature, and engage
com
m
unities, M
oray is on the path towards a greener, healthier,
and m
ore resilient future. Strategic investm
ent, collaboration and
innovation will drive progress, ensuring that clim
ate action
strengthens the local econom
y, protects and enhances its natural
resources, and benefits all its residents.
2
Climate Change Plan and Route Map to Net Zero 2026 update
Page 134

Page 135

3
Climate Change Plan and Route Map to Net Zero 2026 update
1.1
Introduction 
In June 2019, the Council form
ally declared a clim
ate em
ergency,
acknowledging the significant im
pact clim
ate change will have on
the local econom
y, public health and the environm
ent. 
The Council also adopted a Clim
ate Change Strategy setting out an
am
bitious plan to reduce our organisational em
issions and explore
how
to adapt to our changing clim
ate, while supporting and
encouraging local com
m
unities and organisations to do likewise.
At the tim
e of writing, public feedback is being sought on an
update of the Clim
ate Change Strategy to address new
challenges
and opportunities. 
This Routem
ap to Net Zero supports the Clim
ate Change Strategy,
looking back on our progress to date and our path towards
com
plying with our goals and duties in line with the Scottish
Governm
ent’s statutory net zero target of 2045. 
The Council declared a nature em
ergency in February 2023. This
recognises the value of nature and its role in achieving clim
ate
targets, m
aintaining a strong econom
y and protecting the health
and wellbeing of future generations. The im
portance of using
nature-based solutions to clim
ate change are well recognised, with
positive outcom
es for both m
itigation and adaptation. 
1.2
Im
pacts of a changing clim
ate 
The clim
ate is changing faster than ever previously experienced.
There is scientific consensus that the significant increase in global
tem
perature over the last 150 years is prim
arily driven by hum
an
activities1 , especially the burning of fossil fuels, which release
greenhouse gases (GHGs) into the atm
osphere (Figure 1). These
gases trap heat, causing global tem
peratures to rise. To lower the
risk of increased extrem
e weather events and sea level rise, drastic
reductions in em
issions are required to lim
it global warm
ing to
1.5°C. 
1. W
hy we are taking clim
ate action
1
IPCC (2021) ‘Hum
an Influence on the Clim
ate System
’
Figure 1.
Global atm
ospheric carbon dioxide (CO2) concentration from
803,720
BCE to present day. Data from
National Oceanic and Atm
ospheric
Adm
inistration (2023)
Levels of carbon
in
the atm
osphere over tim
e
Page 135

Page 136

On a local level, the im
pacts of global tem
perature increases are already being experienced. Events such as heatwaves, floods, droughts,
wildfires continue to increase in frequency in M
oray.
4
Climate Change Plan and Route Map to Net Zero 2026 update
2
Changing clim
ate | Scotland's environm
ent web
Heatwaves: 
Scotland’s 10 warm
est years on record have all occurred
since 1997. The warm
est year on
record was 2025.
Heatwaves not only drive hot daytim
e tem
peratures but
also elevate nighttim
e lows and can stress health system
s,
agriculture and ecosystem
s.
Flooding: 
In 2024, SEPA issued a historically high num
ber of flood
warnings; the second highest ever on record, which reflects
widespread flood risk around the country. Dry periods often
increase run-off
during sudden heavy rain, worsening flash
flooding. M
oray’s coastal com
m
unities are particularly under
threat from
rising sea levels and worsening storm
surges
leading to property dam
age and infrastructure disruption.
Droughts: 
Scotland historically has abundant rainfall, but sum
m
er
drought periods are becom
ing m
ore noticeable, linked with
heatwaves and changing rainfall patterns. M
odels project
increased drought risk and prolonged dry spells over the
com
ing decades2
2025 saw
early warnings for water scarcity
as dry spells and hot weather increased wildfire risk
dram
atically.
W
ildfires: 
Scotland overall saw
an exceptionally active wildfire year in
2025, with wildfire incidents and area burned far exceeding
previous years. In late June and early July 2025, wildfires in
and near M
oray, especially on the Dava M
oor, form
ed part of
what has been described as the largest wildfire event in
Scotland’s history, which, com
bined with nearby Highland
fires, burnt an area estim
ated at around 29,225 acres
(≈11,827 hectares), which is the equivalent of roughly 10,500
football pitches.
Page 136

Page 137

5
Climate Change Plan and Route Map to Net Zero 2026 update
Clim
ate change and biodiversity loss are interconnected. The
degradation of ecosystem
s is both a consequence of and a
contributor to clim
ate change. As biodiversity declines, our
capacity to adapt to a changing clim
ate is weakened. This poses
risks to key sectors in M
oray such as forestry, food and drink,
tourism
, as well as public health.
The extent of future clim
ate change will depend on how
quickly
and significantly we reduce greenhouse gas em
issions. W
hile rapid
m
itigation can lim
it the severity of im
pacts, som
e degree of change
is now
inevitable due to past and ongoing global em
issions.
The Council m
ust plan for a likely average global tem
perature rise
of 2°C, while also preparing for the possibility of increases up to
4°C by 21003 , given current global em
ission trends and the long-
lasting effects of historical em
issions.
If global targets continue to be m
issed, the quality of life in M
oray
is likely to be fundam
entally degraded by the end of the century.
To avoid the m
ost severe outcom
es, there is an onus on all to
pursue deep and im
m
ediate em
issions reductions, alongside
robust adaptation m
easures to m
anage the unavoidable im
pacts.
3
Independent-Assessm
ent-of-UK-Clim
ate-Risk-Advice-to-Govt-for-CCRA3-CCC.pdf
Dava wildfires ©
Scottish Fire and Rescue Service 2025
Page 137

Page 138

1.3
Statutory obligations 
The Council has statutory obligations to undertake clim
ate action.
To achieve net zero em
issions by 2045 is a collective responsibility
across local authorities. 
Scotland aim
s to reduce greenhouse gas em
issions to reach net
zero by 2045. The Clim
ate Change (Scotland) Act 2009 places a
duty on all public bodies to act to deliver on the national carbon
budgets. 
Under the current legislation, M
oray Council has three m
ain
duties: 
M
itigation: to contribute to reducing greenhouse gas em
issions 
Adaptation: to help Council services and com
m
unities adapt to
the effects of a changing clim
ate 
Sustainability: to act in a sustainable m
anner 
The Council is required to report on com
pliance with these duties
annually in accordance with the Clim
ate Change (Duties of
Public Bodies: Reporting Requirem
ents) (Scotland) Order 2015
and subsequent am
endm
ents. 
The Scottish Parliam
ent recently passed two pieces of clim
ate
legislation, the Clim
ate Change (Em
issions Reduction
Targets)
(Scotland) Act 2024 and the Clim
ate Change (Scotland) Act 2009
(Scottish
Carbon
Budgets) Am
endm
ents Regulations 2025.
These resulted in a new
system
of carbon budgets to replace
interim
targets, bringing Scotland into line with the rest of the UK. 
The following policies represent statutory requirem
ents that m
ust
be com
plied with and reported on by local authorities, and contain
elem
ents of clim
ate change action: 
National Planning Fram
ework 4 (NPF4) incorporates the
national clim
ate change targets into the local planning system
to
prom
ote sustainable developm
ent. 
The Heat Networks (Scotland) Act 2021. Heat networks, also
known as district heating, distribute heat from
a central source to
m
ultiple buildings, reducing the need for individual heating
system
s and prom
oting energy effi
ciency. The Council is required
to undertake assessm
ents of the potential for heat networks in
M
oray and develop plans to prom
ote their use. 
The Local Heat and Energy Effi
ciency Strategies (Scotland)
Order 2022 (LHEES) requires the Council to develop plans to
im
prove energy effi
ciency and reduce carbon em
issions in
buildings across M
oray. 
The Nature Conservation
(Scotland) Act 2004 places a duty on
the council to consider biodiversity in its decision-m
aking
processes and to prom
ote the conservation of local habitats and
species. 
Scottish
Biodiversity Strategy and Delivery Plan
com
m
it to
halting biodiversity loss by 2030 and to restoring and regenerating
nature by 2045. The plan includes strong guidance as to how
the
Council is expected to m
eet its Biodiversity Duty. 
6
Climate Change Plan and Route Map to Net Zero 2026 update
Page 138

Page 139

7
Climate Change Plan and Route Map to Net Zero 2026 update
The Transport (Scotland) Act 2019 aim
s to prom
ote sustainable
transport and reduce greenhouse gas em
issions from
the
transport sector. It has provided the Council with greater powers
to im
plem
ent Low
Em
ission Zones and im
prove active travel
infrastructure. 
Scottish
National Adaptation
Plan
3 (SNAP 3) sets out how
Scotland will adapt to the risks identified in the UK Clim
ate Change
Risk Assessm
ent. The plan includes actions that fall under the
Council’s responsibility, and those it has a supportive role in
addressing. 
The Civil Contingencies Act (2004) requires the Council to assess
the risk of em
ergencies occurring and m
aintain plans to ensure
that services continue to be delivered in the event of an
em
ergency. Severe weather and clim
ate change are linked to
em
ergencies that m
ay result in wide im
pacts ranging from
serious
environm
ental dam
age to loss of life. 
The Flood Risk M
anagem
ent (Scotland) Act 2009 requires the
Council to im
plem
ent and m
aintain flood protection actions and
prepare local flood risk m
anagem
ent plans. The Council is the lead
authority for the Findhorn, Nairn and Speyside Local Plan District
and works with partners to deliver the plan. 
1.4
Co-benefits of clim
ate action 
The Council, working with its partners, has a key leadership role in
em
bedding clim
ate action and a just transition across all planning,
policy, and investm
ent decisions. As every council service
influences clim
ate outcom
es, aligning the Council’s £294.2 m
illion
budget with clim
ate objectives presents a significant opportunity
to deliver environm
ental, econom
ic, social, and environm
ental
benefits. 
Econom
ic benefits arise from
reduced energy and operational
costs, investm
ent in low-carbon infrastructure, and the growth of
M
oray’s green econom
y. Targeted investm
ent in green skills and
technologies can enable a Just Transition creating high-quality local
jobs, support for local supply chains, and helping to retain young
people, while reducing the long-term
financial risks and costs
associated with clim
ate change. 
Social benefits include tackling fuel poverty, im
proving public
health and wellbeing, and reducing inequalities. M
easures such as
im
proving housing quality, expanding access to greenspace, and
delivering sustainable transport options can lower household
energy bills, im
prove health outcom
es and productivity, and
reduce pressures on health and social care services. 
Environm
ental benefits include reducing greenhouse gas
em
issions, im
proving energy effi
ciency and therm
al com
fort, and
enhancing natural environm
ents through nature-based solutions.
These actions strengthen M
oray’s resilience to clim
ate im
pacts
such as extrem
e weather, flooding, and biodiversity loss, while
supporting long-term
environm
ental sustainability. 
Delivering these benefits depends on collective action through a
just transition. By involving com
m
unities in decision-m
aking and
supporting com
m
unity-led initiatives, clim
ate action can
strengthen local em
powerm
ent, build resilient com
m
unities, and
ensure that the transition to a low-carbon future is fair and
inclusive for all. 
Page 139

Page 140

The Council recognises that a considered approach is necessary
for successful clim
ate action. To ensure the greatest im
pact from
our resources, clim
ate action m
easures should be designed into all
services and budgets rather than considered in isolation. 
Four key principles will underpin the approach that the Council will
take to progressing clim
ate change actions from
2025-35 (Figure 2):
8
Climate Change Plan and Route Map to Net Zero 2026 update
The Council’s declaration of a clim
ate and nature em
ergency
places urgency on the pace and scope of all actions. The Clim
ate
Change Strategy 2025-2035 sets out how
the Council will respond
to the clim
ate and nature em
ergencies within the existing financial
settlem
ent and achieve its statutory duties. This requires: 
Strong leadership: Clim
ate action is supported by Elected
M
em
bers and the Council’s corporate leadership team
. They are
visibly involved in clim
ate action initiatives, they routinely
engage in updates on the Council’s progress to net zero and
Councillor van der Horn has been appointed as Clim
ate Change
Cham
pion. 
Suffi
cient resources: Securing external funding is essential to
progress the am
bition in the Strategy. However, em
bedding
actions within ongoing transform
ation of services is also
essential to ensure that the Council reduces costs and its
im
pacts on the clim
ate and nature. Investm
ent as spent-to-save
ensures effi
cient use of lim
ited resources. 
Collective responsibility: Everyone at the Council has a
responsibility to act sustainably in the interests of the Council
and the environm
ent. 
An
em
powering change culture: The Council fosters a culture
that encourages and supports innovative ideas for reducing
em
issions and wider im
pact on the environm
ent. 
2. How
we approach clim
ate action
Figure 2. Principles behind the Clim
ate Change Strategy Update 2025
Effi
ciency: Our initial focus is on reducing energy
consum
ption, m
aking effi
cient use of existing
resources, and undertaking achievable projects where
return on investm
ent is highest and m
ost cost-
effective. If planned correctly, m
ultiple benefits can be
achieved from
single interventions. 
Preparedness: W
e will strategically develop projects
to advance the Council’s priorities, enhancing our
ability to respond to external funding opportunities.
Balance: Our investm
ents will adopt a practical
approach which considers ongoing revenue costs and
the carbon-saving opportunity costs of projects. This
will ensure that public funds are used for m
axim
um
im
pact.
Collaboration: W
e will engage with com
m
unities, the
public sector, and industry to be responsive,
encourage innovation and ensure that our actions
prom
ote a just transition for M
oray. Services within
the Council and com
m
unities should be partners in
delivering clim
ate change solutions.
Page 140

Page 141

Clear and transparent com
m
unication: Com
m
unications
around clim
ate and nature should use non-jargon clim
ate
change language to ensure understanding and prom
ote
behaviour change. 
Robust targets, m
easurem
ent and evaluation: W
henever
possible, the Council’s targets are m
easurable, and reporting
m
echanism
s are clear and transparent. 
2.1
How
we define net zero 
Net zero m
eans cutting greenhouse gas em
issions to as
close to zero as possible, with any rem
aining em
issions re-
absorbed from
the atm
osphere; for exam
ple, by oceans and
forests. 
Em
issions can be categorised in three Scopes (see also
Figure 3): 
Scope 1: em
issions originating from
sources directly within the
Council’s control, e.g. fuel use in vehicles or buildings (heating), 
Scope 2: em
issions originating from
sources outside the
Council’s direct sphere of influence, but where they are the
direct user of a good or service, e.g. grid electricity use. 
Scope 3: em
issions originating from
sources where the Council
can influence but has no direct control, e.g. procurem
ent of
food for school catering, or staff
com
m
uting to work. 
9
Climate Change Plan and Route Map to Net Zero 2026 update
Figure 3. Em
issions scope classification for M
oray Council activities.
The updated Clim
ate Change Strategy 2025-2035 will include
a series of carbon budgets in line with the Scottish
Governm
ent’s carbon budgets (this will be discussed further
on in this docum
ent). This will m
ean a backstop date of 2045
for Council activities to be net zero. 
The Council has a statutory duty to report on all Scope 1 and
2 em
issions, and all Scope 3 em
issions from
“relevant and
significant areas of the organisation’s indirect em
issions”
greater than 1%
of total organisational em
issions. 
Page 141

Page 142

2.2
How
we achieve carbon
reductions 
The Council uses a carbon m
anagem
ent hierarchy approach to
prioritise its necessary actions (Figure 4). This approach prioritises
the avoidance of carbon em
issions to deliver lasting change.
W
here avoidance of em
issions is not possible then they should be
reduced through service effi
ciencies or redesign. Rem
oval of
em
issions is required where further reductions cannot be
achieved. 
10
Climate Change Plan and Route Map to Net Zero 2026 update
Figure 4. M
oray Council carbon m
anagem
ent hierarchy
For exam
ple, actions m
ight look like: 
AVOID: Redesign services to enable hom
e working and avoid
com
m
uting
REDUCE: Reduce energy use in buildings through sm
art tim
ing
solutions
REPLACE: Decarbonisation of Council fleet by replacing diesel
vehicles with electric alternatives or the use of staff
e-bikes
OFFSET: Plant an area of woodland on Council land to offset
unavoidable em
issions 
Page 142

Page 143

11
Climate Change Plan and Route Map to Net Zero 2026 update
Offsetting ‘unavoidable’ em
issions through offsetting schem
es
should be considered as a last resort in target setting. Carbon
offsetting is the process of com
pensating for carbon em
issions by
initiating projects that reduce or rem
ove greenhouse gases
elsewhere. This m
ight include planting trees, supporting renewable
energy, restoring peatlands, or investing in energy-effi
cient
com
m
unity initiatives. 
Offsetting significant levels of carbon by the Council is discouraged
as large-scale offsets are not sustainable and Scottish national
guidance m
akes clear that public bodies are required to avoid,
reduce and replace em
issions as m
uch as possible before
considering offsets. 
2.3
Baselining our em
issions 
Calculating a baseline of em
issions helps to determ
ine the level of
intervention needed to achieve net zero carbon em
issions, and to
allow
progress to be m
onitored. 
The Council’s carbon em
issions from
2017/18 are used as a
baseline for em
issions (Table 1). This year was chosen as it was the
earliest year that had a com
prehensive return of em
issions to the
Scottish Governm
ent. 
Staff
com
m
uting em
issions have only been recorded since the
2022/23 period, and ‘refuse to com
bustion’ has been added since
2024/25 following opening of the NESS Energy from
W
aste facility
in Aberdeen. However, to ensure consistency with the current
scope of reporting, estim
ated historical em
issions in these
categories have been added using known em
ission factors. 
Page 143

Page 144

12
Climate Change Plan and Route Map to Net Zero 2026 update
Building heat
Scope 1 and 2
Building electricity
Scope 2
Fleet
Scope 1 and 2
Area
Description
Em
ission
Source
4,077.9
1,034.1
34.7
15.4
1,122.0
1,177.3
1,685.5
523.8
358.5
145.7
249.6
346.2
611.0
3,591.5
27.5
776.6 0.0 0.0
68.2
Natural gas
Fuel oil / Kerosene
Biom
ass
Purchased heat and steam
Prim
ary schools and nurseries
Secondary schools
Unm
etered electricity
Offi
ces
Com
m
unity facilities
Residential hom
es and day centres
Sports facilities
Industrial
Other
Diesel
Petrol
Gas oil
Electric vehicles
Hybrid vehicles
M
arine fuel oil
Em
issions from
heating of council
buildings, such as offi
ces, schools,
m
edical centres.
Em
issions from
electricity use in
council buildings.
Em
issions from
the operation of the
Council’s fleet vehicles and vessels.
Baseline Carbon
em
issions (tCO 2e)
Page 144

Page 145

13
Climate Change Plan and Route Map to Net Zero 2026 update
W
aste
Scope 3    
Operational activities
Scope 3 
Area
Description
Em
ission
Source
Total: 31,479.40.0
9,130.3
2,048.7 
387.2 
72.1
3,475.0 0.0
125.8
394.8
Landfill gas
M
unicipal refuse to landfill
Com
m
ercial, industrial and clinical
waste to landfill
Recycling and com
posting 
Outdoor spaces
Com
m
uting em
issions
Hom
eworking em
issions
W
ater supply and treatm
ent
Corporate travel 
Em
issions from
dealing with
m
unicipal and industrial-level
waste.   
Em
issions generated by the council
through its day-to-day work,
including corporate travel. Som
e are
em
issions that the council can
influence rather than control 
Baseline Carbon
em
issions (tCO2e)
Table 1 - M
oray Council 2017/18 baseline carbon em
issions
Page 145

Page 146

Progress in
2024-2025 
Since reporting year 2023/24, there has
been an 7.7%
decrease in the Council’s
em
issions. These are largely the result of a
reduction in fuel oil / kerosene use and
gas for heating, and a change in the
treatm
ent of m
unicipal waste which now
goes to the NESS Energy from
W
aste
facility in Aberdeen. Com
pared to the last
reporting year there has been an increase
in diesel usage of 7%. 
The Council’s em
issions during reporting
year 2024/25 by area is shown in Figure 5.   
The m
ain sources of em
issions during
reporting year 2024-2025 were: 
Scope 1: natural gas to heat the
council’s buildings - 23%
Scope 1: diesel for its fleet vehicles -
21%
Scope 3: com
m
ercial, industrial and
clinical waste to landfill - 15%
Scope 3: staff
com
m
uting to work - 13% 
14
Climate Change Plan and Route Map to Net Zero 2026 update
3. Reducing Council Em
issions
Figure 5. M
oray Council em
issions by sector during reporting year 2024-2025
Page 146

Page 147

3.1.1
Overview
The Council owns and operates a diverse portfolio of buildings
including offi
ces, schools, libraries, sports centres, and depots.
These vary widely in age, size, energy effi
ciency, and condition.
M
ost of these buildings are heated using natural gas or fuel oil /
kerosene. Biom
ass system
s have been installed at Speyside and
M
ilne’s high schools. There is a sm
all but increasing num
ber of
buildings fitted with solar PV panels.
Closure and relocation of three offi
ces has been com
pleted since
M
arch 2025.This has reduced the overall building estate footprint
and associated carbon em
issions. Im
proved use of HQ, the HQ
Annexe and Rose Cottage has enhanced effi
ciency and supports
sm
arter working practices.
The Council building portfolio rem
ains slow
to transition to
decarbonised heating. Despite progress in carbon reduction, solar
PV installations, surplus property sales, and building retrofits, due
to restricted budgets.
15
Climate Change Plan and Route Map to Net Zero 2026 update
3.1.2
Current Em
issions
Energy consum
ption from
the Council’s buildings for 2024/25 was
37,461,982 kW
h, which is just over a 4%
decrease com
pared to the
previous year. Figure 6 gives an overview
of recent year’s energy
usage changes:
Figure 6.
Carbon em
issions from
M
oray Council’s energy usage from
reporting
year 2027/18 to present.
3.1
Building heat and electricity
Page 147

Page 148

Em
issions from
the Council’s buildings are split into two
categories: building heat and building electricity. 
Building heat:
The Council’s current largest em
ission source is the provision of
heat to our buildings, contributing to 26%
of total em
issions.
Building heat is generated by the usage of natural gas, fuel oil /
kerosene and biom
ass. W
hile fuel oil / kerosene em
issions have
fallen by 57%
since the 2017/18 baseline, the Council rem
ains
dependent on natural gas boilers for m
ost building heat.
Em
issions from
natural gas have reduced by 3%. 
The reduction in the burning of fuel oil / kerosene for heat has
seen em
issions fall by 206 tCO2e in between reporting year
2023/24 and reporting year 2024/25. This is prim
arily due to less
down tim
e of biom
ass boilers as kerosene is used as a backup
heat source. The subsequent increase in woodchip and wood
pellets has led to an increase of around 1.4 tCO2e giving a
substantial overall saving in em
issions 
Heating consum
ption decreased by 4.6%
com
pared to the
previous year. This can largely be attributed to warm
er weather
conditions, the introduction of im
proved heating controls in som
e
schools, im
proved m
onitoring and m
anagem
ent of heating
system
s, and the vacating of several offi
ce buildings. 
16
Climate Change Plan and Route Map to Net Zero 2026 update
Two successful applications have been m
ade to receive external
funding: 
1.A grant of £593,880 was awarded from
Scotland’s Public Sector
Decarbonisation Fund via Salix towards building fabric
im
provem
ents and changing to a zero direct em
issions heating
system
in Cullen Prim
ary School. W
orks have progressed on site
with m
ost fabric m
easures com
plete. 
2.A feasibility study into the creation of a heat network in the
centre of Elgin has been produced following grant funding from
the Scottish Governm
ent’s Heat Network Support Fund. Offi
cers
have now
requested an addendum
to this study. W
hen this has
been received and findings presented, further reports will be
presented to Council with the findings and potential next steps
required to progress the project. 
Page 148

Page 149

17
Climate Change Plan and Route Map to Net Zero 2026 update
Building electricity:
Em
issions from
electricity use have fallen by 60%
since 2017/18,
though a sm
all increase of 1.5%
has been recorded since the
previous reporting year. This increase can largely be attributed to
the new
electricity shore supply at Buckie Harbour, which services
vessels when in harbour and reduces ship exhaust em
issions.
However, the overall reduction is the result of the decarbonisation
of the national grid, along with energy effi
ciency im
provem
ents
such as LED
lighting replacem
ent and the installation of solar
panels. 
LED
lighting can reduce electricity consum
ption by between 40%
to
60%
com
pared to older fluorescent bulbs. These last longer and
have lower m
aintenance costs. Replacem
ents have taken place at
Council HQ, HQ
Annexe, Ashgrove Depot, and Buckie sports
pitches. 
Solar PV projects on the rooftops of Ashgrove Depot (see Case
Study 1), Council HQ, HQ
Annexe and Elgin Library are now
com
plete. The Council’s solar PV projects generated 53,616 kW
h of
renewable electricity in 2024/25. This represents an increase of 4%
in renewable energy generated com
pared to 2023/24. 
Further energy and cost reductions could be achieved with the
wider rollout of sim
ilar spend-to-save projects, particularly through
widespread adoption of solar PV panels.  
Procured in August 2024 and com
m
issioned between April and
June 2025, solar photovoltaic (PV) panels have been installed
on buildings at Ashgrove Depot. The project was funded
internally under a “spend to save” approach. To date, the
system
has operated sm
oothly, generated electricity
supporting lighting, workshop and offi
ce activities, EV charging,
and other general electricity dem
ands. Surplus electricity is
exported to the grid. The system
can be m
onitored rem
otely,
enabling prom
pt identification and resolution of any issues. 
The installation was led by Hub North Scotland Ltd (HNSL).
Delivery by an external contractor enabled a faster project
tim
eline than would have been achievable through in-house
delivery, reduced pressure on internal resources, and ensured
the project benefited from
specialist expertise and capability.
Case study 1
Solar PV
on
council buildings
Page 149

Page 150

18
Climate Change Plan and Route Map to Net Zero 2026 update
Outcom
es 
Reduced heat and
electricity
consum
ption    
M
ore energy
produced by
renewables 
Reduced building
carbon
output and
increased energy
effi
ciency
Actions include: 
Increase building user awareness of
ways to reduce energy use and
save utility costs
Continue to install LEDs and energy
saving devices
Prom
ote sm
arter working 
Investigate feasibility of renewable
energy potential across the
Council’s property portfolio, and
potential for connection to a heat
network 
Install renewable energy
technologies on Council-owned
buildings and land 
Progress a ‘fabric first’ approach to
building retrofit
Identify opportunities for 'Heating
and Power' refurbishm
ent to be
im
plem
ented in the next 10 years.
Replacem
ent of carbon-based
heating system
s when feasible 
Achieve Energy Effi
ciency Standard
for Social Housing (EESSH) for all
council housing 
Som
e figures: 
Perform
ance 
Annual PV Generation: 44,916 kW
h
Self-Consum
ption: 98.4%
(44,219 kW
h used on-site)
Grid Export: 697 kW
h
Financial 
Investm
ent: £56,432
Payback Period: 4.3 years
Internal rate of return (IRR): 25.86%
First-Year Savings: £11,932
Lifetim
e Savings (25 yrs): approx. £514,467 
Carbon
Im
pact: 
Annual Avoided Em
issions: 10.5 tCO 2e/year 
25-Year Avoided Em
issions: 262.5 tCO 2e
Page 150

Page 151

3.2
Fleet
3.2.1
Overview 
The Council’s fleet is used by em
ployees to conduct council
business and deliver services for M
oray’s residents. It com
prises
over 500 cars, vans, buses, trucks, specialist vehicles and vessels,
m
ost of whom
drive on fuel through internal com
bustion engines
(ICE). At present, the council’s existing fleet contains a total of 67
electric vehicles (EV) with a further 6 on order. This currently
represents 13.4%
of the fleet rising to 14.6%
by the end of
reporting year 2024/25. 
M
ost of the fleet vehicles run on diesel fuel. M
arine fuel oil is
currently used in council vessels. Petrol is m
ostly used for open
spaces m
achinery. However, strim
m
ers, lawnm
owers etc are being
exchanged for rechargeable battery m
achines. 
The Zero Em
ission
Fleet Replacem
ent Strategy (ZEFRS, April
2024) details the Council’s plans to decarbonise the rem
ainder of
the fleet in line with the Scottish Governm
ent’s net zero targets.
However, funding these plans is a challenge as the Council have
cut its budget to achieve £7.5m
of savings. This cut will need to be
carefully assessed, and a decision m
ade on future priorities. The
ZEFRS is being revised to take account of the changes in capital
budget and a spend to save case is currently being produced to
look at the interplay between revenue m
aintenance of the
Council’s fleet and capital costs to replace vehicles. 
19
Climate Change Plan and Route Map to Net Zero 2026 update
3.2.2
Current em
issions 
The use of diesel of Council vehicles m
akes up 97%
of the Council’s
Fleet em
issions. Following a tem
porary reduction due to the
COVID-19 working restrictions, em
issions have returned to near
pre-pandem
ic levels. Com
pared to reporting year 2023/24,
em
issions derived from
diesel usage, have gone up by 7%. 
Gas oil use in transportation has reduced to zero since reporting
year 2023/24, as it is no longer perm
itted as road fuel. 
EV charging consum
ption increased from
544,371 kW
h in 2023/24
to 606,912 kW
h in 2024/25, which is an increase of 11.5%. 
Page 151

Page 152

20
Climate Change Plan and Route Map to Net Zero 2026 update
In 2025, 9 EV charging points were installed in Rose Cottage car
park to be used for pool cars. 6 diesel pool cars which each
travel around 80,000 m
iles on average were replaced with 6
electric vehicles. They were chosen for their 8-year warranty,
low
cost, long range, and good internal size. 
These changes resulted in: 
Environm
ental Im
pact: CO 2 em
issions reduced by
approxim
ately 11.5 tons annually 
Financial Im
pact: fuel savings; £5,000 per year; m
aintenance
costs reduced by 75% 
Operational Im
pact: vehicles m
et all perform
ance
requirem
ents 
Figure 7. M
oray Council’s Transport related em
issions over tim
e
Case study 2
Page 152

Page 153

21
Climate Change Plan and Route Map to Net Zero 2024 update
Outcom
es 
Decarbonising
council fleet       
Actions and
opportunities to
reduce com
m
uting
em
issions  
Facilitating
em
issions
reduction
from
travel
Actions include: 
Displace fossil fuel powered
vehicles and plant with ULEV
alternatives (as budgets allow)
Trial HVO
fuel in diesel fleet vehicles
M
onitor progress on hydrogen
suitability for fleet vehicles
Develop Ashgrove depot as a green
hub 
Prom
ote active travel for M
oray
Council em
ployees 
M
onitor uptake of ultra-low
em
ission vehicle (ULEV) salary
sacrifice schem
e for em
ployees 
Com
plete delivery of Pathfinder
Project to provide m
ore public EV
charging facilities in M
oray
(delivered by EZO, see Electric
Vehicle Charging - M
oray Council)
Parking m
anagem
ent around
schools and supporting m
odal shift
from
vehicles to active travel 
3.2.3
Action
areas
The replacem
ent was based on a feasibility study around the
dem
and for m
ore EVs, availability of power at the location,
and a ‘spend (capital) to save (revenue)’ approach - where the
lifetim
e costs are less than sim
ilar sized diesel vehicles. 
The m
ain challenge has been around load-balancing. This
involves allowing the m
axim
um
num
ber of cars to be
charged over a period of tim
e without depriving HQ
of power
which it needs for offi
ce functions &
heating. That has been
dealt with through using load balancing software and
m
axim
um
load hardware.
Page 153

Page 154

3.3.1
Overview 
W
aste is collected across M
oray from
households and com
m
ercial
organisations. At the end of 2023, the Council diverted its
m
unicipal waste from
landfill to the NESS Energy from
W
aste
facility, shared with Aberdeen City Council and Aberdeenshire
Council. The Dallachy landfill site has now
been fully capped and
reinstated. M
oray Council are no longer actively landfilling any
waste from
its operations or as received from
private sector
operators, which is a m
ilestone after decades of disposing of waste
through landfill. 
Disposing of waste within landfill is the worst option for the
environm
ent and leads to significant carbon em
issions. It should
be the last resort for waste disposal (Figure 8). Prioritising the
waste m
anagem
ent hierarchy is crucial for further reduction in
waste em
issions. This m
eans encouraging and im
plem
enting
initiatives which prom
ote waste prevention, reuse and recycling
wherever possible. Increasing recycling has the additional benefit
of reducing the em
issions required to extract and process further
m
aterials. 
In October 2025, SEPA released the offi
cial Household W
aste
Recycling Perform
ance results for all Local Authorities across
Scotland. The results were based on perform
ance within the 2024
calendar year. M
oray was 2nd place for recycling perform
ance
from
all 32 Local Authorities with 56.7%
of all waste recycled. 1st
place was Clackm
annanshire with 57.2%. 
22
Climate Change Plan and Route Map to Net Zero 2026 update
Figure 8 - Scotland's waste m
anagem
ent hierarchy (Scottish Governm
ent 2015)
3.3
W
aste
In addition, the Council secured £130k of funding through the
Scottish
Governm
ents Recycling Im
provem
ent Fund, for new
and im
proved com
m
unal recycling bins for selected locations
around M
oray where contam
ination was high through m
isuse.
These bins have been rolled out, and the reduced levels of
contam
ination m
ean that the council captures slightly higher
volum
es of good quality m
aterial, im
proving recycling and
reducing the volum
e of m
aterial rejected and ultim
ately being sent
away for incineration. 
M
oray Council’s partner, M
oray Clim
ate Action Network
(M
orayCAN), released an insightful video on the journey of waste
in M
oray: M
oray Clim
ate Action
Network. 
Prevent
If you can’t prevent, then...
Prepare for reuse
If you can’t prepare for reuse, then...
Recycle
If you can’t recycle, then...
Recover other value
If you can’t recover value, then...
Dispose
Landfill if no alternative available.
Page 154

Page 155

3.3.2
Current em
issions 
Significant investm
ent in the joint NESS Energy from
W
aste facility
has resulted in a 30%
reduction in em
issions from
the Council’s
waste operations over the past reporting year, and an overall 76%
reduction com
pared to the NESS was operational (2023). This
facility processes non-recyclable waste to produce electricity for
the national grid, and heat for a district heating network (See Case
Study 3). 
Other em
issions from
waste m
anagem
ent include those incurred
from
com
m
ercial, industrial and clinical waste to landfill, and
recycling and com
posting, now
m
aking up 89%
and 6%
of waste
em
issions respectively. This can be seen in Figure 9. 
3.3.3
Action
areas 
23
Climate Change Plan and Route Map to Net Zero 2026 update
Divert non-recyclable waste to NESS
Energy from
W
aste facility in Aberdeen   
W
orking with Zero W
aste Scotland and
third sector partners to progress
projects to reduce waste through re-
use and recycling 
Reduced
em
issions from
non-recyclable
waste 
Reduction
in
residual waste 
Outcom
es
Actions include:
Figure 9 - M
oray Council’s W
aste related em
issions over tim
e
Page 155

Page 156

Case study 3
NESS Energy from
W
aste facility
24
Climate Change Plan and Route Map to Net Zero 2026 update
The NESS Facility serves three council areas, handling waste from
over 226,000 hom
es. Each year, up to 150,000 tonnes of non-
recyclable household waste is collected by the councils and
delivered to the facility, which operates 24 hours a day to ensure
continuous processing. On average, around 307 vehicles tip weekly
at the site. 
The facility not only m
anages waste effi
ciently but also generates
energy: it exports 12M
W
of electricity to the national grid; enough
to power approxim
ately 20,000 hom
es and can produce up to
10M
W
of heat for the local district heating network. To achieve
this, it burns roughly 450 tonnes of waste per day, which is
equivalent to about 19 tonnes per hour, converting everyday
household waste into a valuable resource for the com
m
unity. 
NESS opening event, 25 April 2024: L-R: Councillor Gillian Owen,
Leader of Aberdeenshire Council; Councillor Ian Yuill, Aberdeen City
Council Co-leader; and Councillor Kathleen Robertson, Leader of
M
oray Council.
Page 156

Page 157

3.4
Operational Activities
25
Climate Change Plan and Route Map to Net Zero 2026 update
3.4.1
Overview 
Operational em
issions result from
the day-to-day work of the
Council. This includes the estim
ated carbon em
issions of
em
ployees working from
hom
e, staff
com
m
uting em
issions,
electricity use in outdoor spaces (such as street lighting, public EV
charging, car parks and public parks), the use and treatm
ent of
water, and corporate travel by public transport or em
ployees’ own
vehicle. 
3.4.2
Current em
issions 
Council staff
com
m
uting em
issions have been recorded since
2022/23 and com
prise 61%
of the Council’s operational em
issions.
Estim
ated com
m
uting em
issions prior to 2022 have been added to
allow
for a consistent scope. To provide better distinction between
em
issions sources, com
m
uting em
issions are shown separately to
hom
eworking em
issions. A Staff
Travel Plan
4
has been developed
to identify opportunities to support a behavioural shift to lower
em
issions m
odes of transport where possible. 
W
ater supply and treatm
ent have reduced considerably. The
Council’s water consum
ption was 18.1%
less than in the previous
year. This can be attributed to the repair of leaks and water
effi
ciency projects. 
Figure 10 - M
oray Council’s Operational em
issions over tim
e
4
Published in M
arch 2021 and up for renewal by M
arch 2027, subject to funding. 
An online clim
ate change training m
odule was launched and has
been com
pleted by 518 m
em
bers of staff, in between 1 M
arch
2024 and 29 October 2025. 
Com
m
unications have published num
erous articles including a
Clim
ate W
eek Interchange article. 
Page 157

Page 158

The Staff
Travel Survey, a bi-annual survey am
ongst M
oray Council
em
ployees, was com
pleted in June 2025. It was com
pleted by 178
council em
ployees and included the following inform
ation: 
44%
live within 5 m
iles of work
Cycling to work has increased from
5%
to 8%
and cycling for
council business has increased from
less than 1%
to over 5%
of
respondents.
Bus use has seen a noticeable jum
p – from
less than 1%
to over
5%
this year.
W
alking rem
ains the m
ost popular form
of active travel for
com
m
uting with 14%.
75%
of staff
still drive petrol or diesel vehicles with 2%
using an
electric vehicle. Convenience and flexibility are the m
ain factors
influencing travel choices, followed by distance.
W
hen asked what would encourage m
ore active travel, the top
responses were safer cycle routes and footpaths, better
showers and changing facilities and secure cycle parking.
For public transport, the m
ost com
m
on requests were for m
ore
frequent and reliable services and cheaper fares.
Car sharing divided opinion, 45%
said nothing would encourage
them
, though som
e wanted help finding suitable lift share
partners. 
Five com
pleted led rides and cycle confidence sessions have been
delivered to council staff. Staff
are encouraged to use the available
staff
pool bikes (push- and e-bikes) available at HQ, for nearby
business travel or trialling com
m
uting. Those who participated
said the sessions m
ade them
m
ore confident to use a bike in town
as well as route planning. 
26
Climate Change Plan and Route Map to Net Zero 2026 update
54 Applications were m
ade to the Cycle to W
ork (C2W
) schem
e in
the last round, with an average spend of £1,457. C2W
is now
open
twice a year. 
3.4.3
Action
areas
Outcom
es
Actions include:
Reduced
em
issions from
operational
actions 
Increased
awareness of
actions and
opportunities to
tackle clim
ate
change
Supporting hom
eworkers to reduce
their em
issions through relevant
advice and practical assistance  
Develop and deliver clim
ate and
nature em
ergency training for staff
and elected m
em
bers
Update clim
ate change awareness
training as part of the em
ployee
induction process
Increase opportunities for’ learning
about clim
ate change and nature’
within the curriculum
. Im
prove the
quality of outdoor learning and play
spaces
Support the developm
ent of
knowledge and skills across
departm
ents – newsletters and
inform
al engagem
ent, lunch &
learn
sessions.
Page 158

Page 159

27
Climate Change Plan and Route Map to Net Zero 2026 update
Outcom
es
Actions include:
Integrate clim
ate
considerations in
decision
m
aking
Applying low
carbon objectives as a
factor in all investm
ent decisions in
relation to budgets and the Capital
Plan
Em
bed m
ain CC Actions within relevant
service plans and sim
ilar to ensure
they are developed and progressed by
service area
Ensuring the Clim
ate Change Strategy
and Action Plan are living docum
ents
and rem
ain fresh and valid until 2035
Review
clim
ate change and biodiversity
assessm
ent of com
m
ittee papers
Continue to develop clim
ate change
guidance for the m
andate decision
process
Contribute to the work of Scottish
Clim
ate Intelligence Service (SCIS) and
Clim
ateView 
Incorporate clim
ate risks into the
corporate risk register
Page 159

Page 160

3.5.1
Overview 
Around a third of the country’s em
issions are influenced by local
authority practices, policy or partnerships5 . Procurem
ent of goods
and services with the Council am
ounts to som
e £126 m
illion
annually. The Council therefore has a significant influence locally
and regionally on clim
ate change through procurem
ent. 
The Procurem
ent Reform
(Scotland) Act 2014 introduced a
sustainable procurem
ent duty for local authorities. This requires
that before the Council buys anything, it m
ust think about:  
how
it can im
prove the social, environm
ental and econom
ic
wellbeing of M
oray, with a particular focus on reducing
inequality 
how
its procurem
ent processes can facilitate the involvem
ent of
SM
Es (sm
all and m
edium
-sized enterprises), third sector bodies
and supported business 
how
public procurem
ent can be used to prom
ote innovation 
Staff
procurem
ent training was delivered in Septem
ber 2024 and
included a rem
inder about the im
portance of considering
sustainability in tenders. 
28
Climate Change Plan and Route Map to Net Zero 2026 update
5
UK Clim
ate Change Com
m
ittee (2020) ‘Local authorities and the sixth carbon
budget’.
Only 4.08%
of contracts com
m
enced during the year included a
sustainability target (in com
parison to 5.68%
in the previous
reporting year). This falls short of the target of 20%. W
ork
continues to explore how
future procurem
ents can include
sustainability elem
ents. 
The Council has an obligation to report on progress towards a
m
ore sustainable procurem
ent process in our annual
procurem
ent report, as well as part of our Public Bodies Clim
ate
Change Duties reports. 
3.5.2
Action
areas 
Outcom
es
Actions include:
M
axim
ise
opportunities
for clim
ate
action
through
procurem
ent
Continue to deliver and record non-
cash benefits such as sustainability,
clim
ate change and com
m
unity wealth
building through the procurem
ent
process 
Deliver sustainable procurem
ent
guidance to offi
cers.
3.5
Procurem
ent and investm
ent
Page 160

Page 161

29
Climate Change Plan and Route Map to Net Zero 2026 update
4.1 Adaptation
4.1.1. Overview 
The Council has a statutory obligation within its annual Public
Bodies Clim
ate Change Duties PBCCD
reporting to record how
it is
contributing to Scotland’s Adaptation Program
m
e (SNAP 3). There
is also a statutory duty to carry out actions to adapt to the im
pacts
of clim
ate change. The key outcom
es that the Council is required
to contribute to include: 
Nature connects across our land, settlem
ents, coasts and seas
Com
m
unities are creating clim
ate-resilient, healthy and
equitable places
Public services are collaborating in effective and inclusive
adaptation action 
NPF4 identifies the Scottish adaptation program
m
e as a
crosscutting policy link, requiring LDPs to adapt to the current and
future risks of clim
ate change. This should be done by prom
oting
nature recovery and restoration in M
oray on the one hand, and by
introducing policy requirem
ents on the other, which ensure that
developm
ents consider and take steps to address a range of
clim
ate risks. 
4.
Adapting to Clim
ate Change and Restoring Nature
4.1.2. Current Activity 
During 2024-25, engagem
ent with key services on how
the Council
is prepared for, and adapting to, the im
pacts of clim
ate change
continued. The council’s first adaptation benchm
arking report was
com
pleted, inform
ing the developm
ent of im
proved recording and
m
onitoring of adaptation activity and gaps. Inform
ation was
gathered to produce a Local Clim
ate Im
pacts Profile (LCLIP) 2018-
2023 in 2025, assessing historical im
pacts to increase
understanding of the potential future costs to the Council from
clim
ate change.   
SNAP 3 was published in Septem
ber 2024, inform
ing the
developm
ent of the Council’s approach to adaptation. Notably,
SNAP 3’s first outcom
e is Nature Connects, reinforcing the
Council’s current approach to closely align biodiversity with wider
clim
ate action. For exam
ple, work has been in progress to m
ap
clim
ate risk and nature-based opportunities to support adaptation
in Elgin, and there are plans to replicate this for other large towns.
This spatial exploration of how
factors such as tree cover interact
with risk of surface heat and flooding and deprivation, will be used
in conjunction with Nature Networks and the Local Developm
ent
Plan to inform
priority areas for urban greening and com
m
unity
connection to nature activities. An exam
ple can be seen on Figure
11: 
Page 161

Page 162

30
Climate Change Plan and Route Map to Net Zero 2026 update
Figure 11: Draft exam
ple of com
bined clim
ate risk in Lossiem
outh
The Scottish Governm
ent’s guidance outlines the need for flexible
m
easures to be taken to adapt to clim
ate change risks to critical
infrastructure. 
The Council is a national leader on coastal change, applying an
innovative pathway approach through a Regional Coastal Change
Adaptation Plan and ten local plans. These enable the Council to
plan for, and react to, different scenarios as they are triggered.
M
oray is covered by Regional and Local Flood Risk M
anagem
ent
Plans that identify vulnerabilities and actions in place to address
risks. Coastal and flooding plans are reported on every 3 years,
and there are no updates at present. 
However, grant funding was secured for several case studies, such
as along various M
oray coastlines. Targeted works along the
Kingston
coastline and within
Findhorn
Bay aim
to significantly
im
prove local resilience to flooding. M
oray is the first area in
Scotland to com
plete all Coastal Adaptation
Plans, giving a clear
roadm
ap for m
anaging future coastal risk. 
The Council continues to support the establishm
ent of
Com
m
unity Resilience Groups, with eight plans now
in place.
These plans help com
m
unities to be prepared for, respond to, and
recover from
em
ergencies, including those m
ade m
ore likely by
clim
ate change, such as severe storm
events. 
Page 162

Page 163

31
Climate Change Plan and Route Map to Net Zero 2026 update
Case study 4
Coastal m
onitoring stations  
M
oray Council has established a network of
m
onitoring stations along its coastline. These
m
onitoring points allow
visitors to take
photographs of the sam
e locations over tim
e,
creating a photographic database that
supports the assessm
ent of coastal change.
This evidence helps to identify whether
coastal change is occurring and to determ
ine
the m
ost appropriate m
anagem
ent
m
easures to be undertaken. 
M
ore inform
ation and uploading im
ages
can be done through the Coastsnap website or
by installing the app. 
The stations are located at the following places:  
Findhorn - 2
Lossiem
outh - 4
Buckpool (Buckie) - 2
Kingston - 4
Cullen - 2 
Signage at the location will be im
proved by installing new
signs.
Outcom
es
Actions include:
Increase
understanding
of clim
ate risk       
Align
adaptation
activities with
Council’s
priorities
Deliver and
m
onitor
adaptation
action     
W
ork
collaboratively
with
partners to
progress
adaptation
action
Create and m
aintain a clim
ate im
pacts
log Produce clim
ate risk and nature-based
solution m
aps for larger towns
Em
bed adaptation within clim
ate
training and m
ainstream
ing
M
ove towards the production of a
Clim
ate Change Risk Assessm
ent
(CCRA) 
Integrate or m
ainstream
adaptation
action into relevant service plans,
strategies and reports
Undertake annual benchm
arking
exercise
Im
plem
ent flooding and coastal risk
action plans
Incorporate adaptation into the LDP
Im
plem
ent a M
oray Nature Network
Em
bed adaptation in the delivery of
other council activities, where
appropriate 
Encourage com
m
unities to consider
clim
ate risk and adaptation 
4.1.3. Action
Areas 
Page 163

Page 164

32
Climate Change Plan and Route Map to Net Zero 2026 update
4.2
Biodiversity, nature and carbon
sequestration 
4.2.1. Overview 
The Council has a duty to further the conservation of biodiversity
when carrying out its work and m
any of the Council’s activities
have the potential to drive biodiversity loss or nature recovery.
These include discharging responsibility as Planning Authority
through application of policy, as a landowner by how
the estate is
m
anaged, and as Education Authority through how
young people
are connected with nature. The Council’s Biodiversity Duty should
be exercised through all these responsibilities to support the
national target to restore and reverse biodiversity loss by 2045. 
Enhancing biodiversity can also sequester carbon through well
m
anaged soil and vegetation, thereby reducing net em
issions. 
The Scottish
Biodiversity Strategy recognises the key role that
local authorities m
ust play in delivering nature recovery. This
includes through the m
anagem
ent of public greenspaces,
developing Nature Networks, securing positive effects for nature
through planning decisions, and integrating biodiversity into
transportation infrastructure and sustainable urban drainage
solutions. 
NPF4 places the clim
ate and nature crises at the centre of planning
policy, in addition to rebalancing planning policy to ensure that
positive effects for biodiversity are secured. Significant weight is to
be given to the clim
ate and nature crises in all developm
ent
decisions, so that biodiversity is enhanced, and nature networks
strengthened. The policies also prom
ote the use of nature-based
solutions.
4.2.2. Current Activity 
The Council continued to collaborate with W
ild Things!
environm
ental education charity to deliver actions across council
sites. This partnership created opportunities for forestry and
nature-based skills developm
ent and supporting wellbeing
through nature connection for people of all ages from
across
M
oray. W
ild Things! continued to progress aspects of this work and
nature connection in council woodlands through their other
program
s. 
The wildflower and living lawn project progressed with 5 new
sites
added and existing sites m
aintained. Ecological training was
provided to Open Space operations team
s to support professional
knowledge around planting and m
anagem
ent practices. 
M
any spaces, including woodlands, are working hard for
biodiversity and clim
ate sequestration with no active or planned
m
anagem
ent. However, m
ost of the Council’s land is not being
m
anaged with biodiversity as a prim
ary objective. This currently
includes m
ost park land, roadside verges, school playgrounds, and
land around housing and other buildings.  
In term
s of the Council’s wider influence, planning continues to be
a focus. New
local guidance for biodiversity was approved,
providing greater clarity on how
NPF4 policy 3 is to be applied in
planning decisions. Developm
ents of every size are required to
enhance biodiversity and should also use nature-based-solutions
where possible. W
ith planning perm
ission granted for over 12,000
units each year in M
oray, this presents a significant opportunity to
secure positive effects for nature. 
Page 164

Page 165

33
Climate Change Plan and Route Map to Net Zero 2026 update
Case Study 5
Connecting people with
nature through
conservation
activity 
Over 2024-2025, the Council partnered with W
ild Things!
environm
ental education charity to progress action plans at
three sites the Council m
anages for nature; M
illbuies, Elgin
Oakwood and the W
ards. 
This collaboration recognised the wider benefits of spending
tim
e in nature for people’s wellbeing and physical health,
and is an approach the Council continues to pursue. 59
residents, including school groups and adult volunteers,
helped to: 
Plant approxim
ately 200 native trees
Rem
ove 1,000 old tree protector tubes
Rem
ove large areas of invasive non-native trees and
plants
Record wildlife sightings and subm
it them
to the North
East Scotland Biological Recording Centre
Care for wildflower and wetland areas 
They also explored the nature they were in, and had fun! The
charity reported that “in addition to actioning the specific
tasks required of the contract, W
ild Things is particularly
proud of the strong com
m
unity engagem
ent with the work,
which dem
onstrates a deep sense of com
m
unity care and
concern for the natural habitats around us.” 
M
oray Nature Network m
apping was com
pleted in early 2025.
The proposed Nature Network is an aspirational plan to
strengthen connections between protected sites and to create
urban-rural wildlife corridors. Preparation of the Local
Developm
ent Plan 2027 and Biodiversity Strategy 2026 - 2036
continue to em
bed the Nature Network. 
As well as joining up nature rich sites, Nature Networks also aim
to
connect people to nature. The council has continued to collaborate
closely with partners, the North East Biodiversity Partnership and
M
oray CAN, to support com
m
unities to learn about and engage
with nature through ways such as providing advice, distributing
sm
all grants, and holding workshops. 
Page 165

Page 166

34
Climate Change Plan and Route Map to Net Zero 2026 update
Outcom
es
Actions include:
M
axim
ise
opportunities to
sequester carbon
within
existing
Council assets 
Prom
ote nature
recovery on
Council land      
Nature recovery
through
policy
and partnerships 
W
ork with
com
m
unities and
partners to
progress
biodiversity
actions at the
local level  
Progress and m
onitor carbon sequestration
opportunities on Council land holdings,
beginning with the developm
ent of a suitable
delivery m
odel  
Produce and deliver nature positive
m
anagem
ent plans for Council greenspace
M
aintain the biodiversity benefits of living lawns
and wildflower program
, and seek to expand it
Increase urban canopy cover and other nature-
based solutions to clim
ate risk, providing
m
ultiple benefits to com
m
unities and developing
nature networks 
Ensure that planning policy, guidance and
decisions deliver positive effects for biodiversity
Identify and deliver a M
oray Nature Network 
Facilitate the developm
ent of skills and
knowledge to protect and restore biodiversity in
M
oray
Help facilitate com
m
unity connections with
nature 
Page 166

Page 167

35
Climate Change Plan and Route Map to Net Zero 2026 update
5.1.
External influence
5.1.1.
Overview
M
any of the Council’s statutory duties focus on reducing
greenhouse gas em
issions across the wider M
oray area. This
includes actions such as supporting energy effi
ciency
im
provem
ents in hom
es, encouraging active travel and prom
oting
green skills training as part of a just transition away from
fossil
fuels.
W
hile this will not reduce the Council’s direct carbon footprint, the
Clim
ate Change Strategy also seeks to reduce carbon em
issions
across M
oray by dem
onstrating leadership and facilitating good
practice.
The leadership role of local authorities is reflected in the Scottish
Public Engagem
ent Strategy for Clim
ate Change, to support the
wider area to understand, participate and act on clim
ate change.
This includes being prepared for the im
pacts of clim
ate change,
and several of the Council’s responsibilities to the wider area cross
over with the duty to support delivery of the Scottish National
Adaptation Program
m
e. In delivering the Biodiversity Duty, the
Council m
ust also aim
to engage the wider com
m
unity with nature
alongside em
bedding nature conservation in service delivery.
Engaging with the com
m
unity is essential to understand local
concerns and bring about necessary change. A collaborative
approach can lead to m
ore effective policies, behavioural changes,
enhanced com
m
unity resilience and a reduction in clim
ate change
im
pacts.
5.1.2.
Current activity
Local Heat and Energy Effi
ciency Strategy (LHEES)
The Council has produced its first Local Heat and Energy
Effi
ciency Strategy 2023-2028 and an accom
panying Delivery
Plan. This Strategy aim
s to support the provision of affordable and
sustainable heating solutions, reduce energy consum
ption and
alleviate fuel poverty. This can help to create jobs, im
prove health
and wellbeing, and contribute to achieving net zero – thus
ultim
ately benefitting the local econom
y and wider environm
ent. 
Housing Support
Two housing im
provem
ent projects (non-council owned) have
taken place during 2024/25: 
1)Energy Effi
ciency Scotland: Area Based Schem
es (EES: ABS)
M
obilisation of the ABS projects was hindered due to delays
receiving grant confirm
ation. However, 49 properties have
benefitted from
energy effi
ciency m
easures from
the 2024/25
allocation, bolstered by over com
m
itm
ent from
previous year
with an investm
ent value of £1.02 m
illion. W
orks included
insulation, ASHP, PV, and battery installation.
5.Sustainable Developm
ent and W
ider Influence
Page 167

Page 168

Learnings from
this year regarding m
arketing is that the M
oray
area seem
s to respond best to in-person efforts such as
telephoning. Uptake from
social m
edia ads, postcards, and
letter drops has been low. The aim
would be to engage in m
ore
in-person canvassing, events, and continuing telephone calls for
future projects. W
ith the announcem
ent that solar PV will no
longer need to be a special project, we are also confident that
we will get higher uptake with this m
easure back on offer. 
2)ECO4 Flex
Since M
ay 2024 until present, the Energy Com
pany Obligation
project (ECOECO4 Flex) has: 
Provided £2M
in ECO
funded upgrades to M
oray Private
Housing; 120 installations com
plete.
Displaced 595 tCO2 em
issions annually
Saved householders roughly £209k annually in bill costs 
The ECO4 Flex program
m
e is due to end M
arch 2026. However, up
to 2025 the following m
easures have been installed:   
36
Climate Change Plan and Route Map to Net Zero 2026 update
Heat network
The Council is investigating the feasibility of a heat network for the
centre of Elgin. The Scottish Governm
ent Heat Network Support
Unit (HNSU) funded a feasibility study where Buro Happold was
appointed to carry out engagem
ent and produce a high-level
feasibility study. The feasibility study is being com
plim
ented by an
addendum
looking at opportunities to include com
m
unity energy
and waste heat from
nearby business. 
National Planning Fram
ework 4 (NPF4)
NPF4 m
ust address the global clim
ate em
ergency and nature crisis
by ensuring the spatial strategy will reduce em
issions and adapt to
current and future risks of clim
ate change. It will help to guide the
location of new
housing, transport links and infrastructure,
ensuring that com
m
unities have access to the services they need
whilst enhancing the environm
ent and m
eeting net zero targets.  
NPF4 introduces the concept of Local Place Plans (LPPs) which are
com
m
unity-led plans that provide a fram
ework for shaping the
future of local places. LPPs are an essential tool for engaging with
com
m
unities and fostering local dem
ocracy, ensuring that M
oray’s
towns and villages are designed with the people who live there in
m
ind. 
Figure 12: ECO4 Flex program
m
e - energy saving installations in reporting year
2024/25.
Page 168

Page 169

37
Climate Change Plan and Route Map to Net Zero 2026 update
Hydrogen
Strategy
The Council’s Hydrogen Strategy seeks to encourage a local supply
chain for hydrogen production and use, providing job
opportunities and econom
ic benefits for the region. Using green
hydrogen as a fuel for transport, heating and industrial processes,
is likely to be essential for cutting M
oray’s regional carbon
em
issions. 
W
hen it is financially viable, the Council will consider piloting a
sm
all num
ber of hydrogen vehicles within its fleet using hydrogen
produced elsewhere, in a m
ove to provide dem
and for hydrogen. 
SCIS
The Council is also engaged in work with the Scottish
Clim
ate
Intelligence Service (SCIS) to better understand M
oray’s area-
wide em
issions and develop an area-wide Clim
ate Change Strategy
in partnership with the M
oray Clim
ate Action Network (M
oray
CAN). 
EV
charging
EZO
has been awarded the contract to deliver charging
infrastructure across the north of Scotland, covering the Highlands,
Aberdeen City, Aberdeenshire, and M
oray Council areas. These
chargers will be m
igrated from
ChargePlace Scotland as part of the
transition process. M
ore inform
ation can be found on the M
oray
Council website. 
Just Transition
The Scottish Governm
ent’s Just Transition Fund, launched in 2021,
is a £500m
ten-year com
m
itm
ent to support projects in the M
oray
and the North East which contribute towards a just transition away
from
carbon-intensive industries. The fund represents a significant
econom
ic opportunity for M
oray with the potential for the creation
of jobs, support for innovation and enterprise, and the
developm
ent and m
aintenance of a skilled workforce. 
Funding for a 2-year fixed-term
senior project offi
cer was approved
by the Council in February 2025. This offi
cer joined the Strategic
Planning and Developm
ent section in August 2025 and has
responsibility for leading on project developm
ent for the Just
Transition Fund. 
It is anticipated that future projects will build upon earlier work
com
m
issioned through the Council’s 2022 Just Transition funding
bid. 
Page 169

Page 170

5.1.3.
Action
areas  
38
Climate Change Plan and Route Map to Net Zero 2026 update
Outcom
es
Actions include:
Develop skills
and the econom
y
Enabling the
com
m
unity to
understand and
act on
clim
ate
change
Increasing provision of relevant skills
and knowledge for a greener econom
y
to support delivery of the M
oray
Apprenticeship Strategy
Support the planning and delivery of
awareness raising events for businesses
to transition to a green econom
y
Joining support networks to assist the
progress of clim
ate change action 
Consulting com
m
unity groups and
residents about clim
ate action and
delivering the Clim
ate Change Strategy
Support the work of M
oray CAN
Engaging with com
m
unities to facilitate
renewable energy projects
Support the developm
ent of a M
oray-
wide clim
ate strategy 
Support the reporting of area wide
em
issions and actions Prom
oting the
Active Travel Strategy
Continuing the Energy Effi
ciency
Scotland: Area Based Schem
e (EES: ABS)
Im
plem
ent ECO4 schem
e for energy
effi
cient hom
e im
provem
ents targeted
at tackling fuel poverty
Outcom
es
Actions include:
Delivering the
LHEES Delivery
Plan     
Delivering the
M
oray Hydrogen
Strategy     
Strategic
planning which
reflects the
clim
ate and
nature
em
ergency    
Im
proving the energy effi
ciency of
buildings while supporting a wellbeing
econom
y, and a Just Transition
Decarbonising building heat sources
including supporting heat networks
while tackling fuel poverty and
im
proving health 
Continue to support a hydrogen
steering group and develop
relationships with key partners and
adjacent Councils
Develop a hydrogen fleet pilot when
availability of hydrogen and suitable
vehicles allow 
Im
plem
enting NPF4 policies relating to
the clim
ate and nature crises
Developing a Regional Spatial Strategy
Em
bedding clim
ate change into new
place based, people centred, delivery
focussed LDP 
Developing 20-m
inute neighbourhood
concepts for M
oray’s m
ain towns and
em
bedding within the next Local
Developm
ent Plan
Page 170

Page 171

39
Climate Change Plan and Route Map to Net Zero 2026 update
Case study 6
M
.Connect 
M
.Connect is an on-dem
and bus service
which aim
s to reduce transport-related
em
issions by 30 tonnes of CO₂e per year
by 2030 and is m
aking strong progress
toward its carbon reduction targets. The
service has encouraged a clear shift from
car to bus travel, with 9,763 additional passenger journeys in
2023/24 and a further 19,712 in 2024/25. This m
odal shift
resulted in indirect em
issions savings of 11.6 tCO₂e in 2023/24
and 23.18 tCO₂e in 2024/25, com
pared with the sam
e journeys
being m
ade by car. 
Across 2023/24 and 2024/25, the service covered 126,363
m
iles, generating 15.36 tCO₂e from
electricity use. By
com
parison, operating a diesel fleet over the sam
e distance
would have produced an estim
ated 52.32 tCO₂e. Electric
operation also delivered cost savings, with electricity costs of
£22,246 com
pared to an estim
ated £29,148 in diesel fuel. 
Both the M
.Connect project and PTU’s routine fleet
replacem
ent program
m
e rem
ain aligned in their com
m
itm
ent
to investing in electric vehicles (EVs). In 2027, two 33-seat EVs
with im
proved range are expected to be introduced, allowing
them
to operate fully on tim
etabled service routes. The project
also plans to install 200 kW
h charging units across the
network, significantly reducing charging tim
es and increasing
vehicle availability. Further EV procurem
ent is planned for
2029, 2030 and 2031, supporting a sustained transition to a
low-em
ission public transport fleet.
Outcom
es
Actions include:
Strategic
planning which
reflects the
clim
ate and
nature
em
ergency
Prom
oting and supporting brownfield
over greenfield developm
ent
Deliver M
oray Growth Deal Housing M
ix
Delivery project 
Update clim
ate change guidance for
planning applications in line with
national guidance 
Page 171

Page 172

5.2.
Sustainable Developm
ent
5.2.1.
Overview
Sustainable developm
ent m
eans m
eeting the needs of the present
without com
prom
ising the ability of future generations to m
eet
their own needs. This requires balancing social, econom
ic and
environm
ental considerations to ensure changes are equitable,
and these values closely align with our corporate vision and key
priorities, as can be found in the Corporate Plan
2024-2029:
1)Tackle poverty and inequality
2)Build thriving, resilient, em
powered com
m
unities
3)Build a stronger, greener, vibrant econom
y
5.2.2.
Current activity
All Public Sector Bodies m
ust dem
onstrate how
they are
progressing sustainable developm
ent as part of their Best Value
duties, ensuring that sustainable developm
ent is:
Reflected in their vision and strategic priorities
Em
bedded in their governance arrangem
ents
Contributed to in the way resources are planned and used
Effectively prom
oted through partnership working
The Council approved a Sustainable Developm
ent Statem
ent in
Novem
ber 2024, including actions identified to progress over the
short to m
edium
term
. Further guidance has been produced on
how
offi
cers can include sustainable developm
ent in the
im
plications section of com
m
ittee reports.
40
Climate Change Plan and Route Map to Net Zero 2026 update
The Council’s approach to sustainable developm
ent reporting and
activities will go out for public consultation as part of the process
of updating the Clim
ate Change Strategy 2025-2035. 
5.2.3.
Action
Areas
Outcom
es
Actions include:
Em
bed
sustainable
developm
ent
into daily service
delivery
Ensure sustainable developm
ent is
included within Council decision m
aking
Identify any further sustainable
developm
ent gaps 
Consider and em
bed com
m
unity views
on sustainable developm
ent
Page 172

Page 173

6.1
Pathway to net zero and carbon
budgets 
The Council currently faces a significant challenge in m
eeting its
carbon reduction targets. Existing efforts have shown prom
ising
results, but haven't yet achieved the desired structural decline, and
a m
ore robust approach and firm
er com
m
itm
ent is needed. 
The current pathway of recorded em
issions (Figure 13) is a
projection created using the data from
the annual em
issions
contained in our Public Bodies Clim
ate Change Duties reports, in
addition to other known data relating to the Council’s pre-planned
and approved actions. 
The current pathway aim
s to show
a realistic projection for the
years ahead, based on current plans and trends, and constraints
on im
plem
entation, technological availability and funding scarcity.
Avoiding late adoption of technology and m
easures to reduce
carbon em
issions are critical because dem
and could increase costs
as the 2045 deadline approaches, and public and private sectors
are potentially legislated to take action.   
41
Climate Change Plan and Route Map to Net Zero 2026 update
The Clim
ate Change (Scotland) Act 2009 (Scottish Carbon Budgets)
Am
endm
ent Regulations 2025 aim
s to establish legally binding
carbon budgets for Scotland, setting lim
its on greenhouse gas
em
issions for the periods 2026-2030, 2031-2035, 2036-2040, and
2041-2045. This replaces the annual target approach as they are
highly vulnerable to year-to-year fluctuations, whereas m
ulti-year
carbon budgets provide a m
ore reliable fram
ework for sustained
em
issions reduction progress. The proposed national budgets are
in line with the advice from
the independent Clim
ate Change
Com
m
ittee (CCC) and the Scottish Governm
ent’s own assessm
ents. 
The average level of em
issions for Scotland over each five-year
period are: 
57%
lower than 1990 levels for 2026 - 2030
69%
lower than 1990 levels for 2031- 2035
80%
lower than 1990 levels for 2036 - 2040 
94%
lower than 1990 levels for 2041 - 2045 
The assum
ptions for our current plans are included in carbon
budget 1 (2025-30) as can be seen in Figure 14. The necessary
reductions to m
eet carbon budgets 2 (2030-35) and 3 (2035-40) are
greater because of the expected tim
ing for decarbonising areas
such as transport or heating. This anticipates accelerated
decarbonisation at a later stage when low
and zero em
issions
technologies becom
e m
ore established and cost effective. 
6. W
here are we going
Page 173

Page 174

42
Climate Change Plan and Route Map to Net Zero 2026 update
Figure 13 - Current pathway of recorded carbon em
issions from
baseline date to 2030. Figures from
2025-26 and onwards are forecast estim
ates and denoted by a
lighter colour.
Page 174

Page 175

43
Climate Change Plan and Route Map to Net Zero 2026 update
The current pathway shows only approved current plans and
external savings. To reach net zero by 2045 the Council needs to be
on the target pathway. The areas of building heat and fleet are the
largest areas of em
issions for the Council and am
ong the m
ost
diffi
cult to reduce. Therefore, the Council should progress
additional plans at pace to reduce its em
issions from
building heat
and fleet vehicles from
2030 to ensure the Council is within its
carbon budget. 
The CCS already recognises the need for external funding to
accelerate the pace of decarbonisation. The recent capital budget
cuts (totalling £34.2M
over the next 3 years) significantly lim
its
financial flexibility in the short term
. As a result, capital-intensive
actions m
ust either be ‘spend-to-save', linked to existing approved
expenditure, or externally funded. W
hile the Council has
successfully secured external funding for clim
ate change projects,
m
any available funding sources are challenging to access. Som
e
are lim
ited by annualised funding cycles, while other funding is
offered in the form
of loans. 
To ensure that carbon reductions can continue it is im
portant to
prepare by strategically developing projects to advance the
Council’s priorities, enhancing our ability to respond to external
funding opportunities when they arise. 
6.2
Being ready for clim
ate im
pacts 
There rem
ains a critical gap in the Council’s readiness for the
im
pacts of clim
ate change. A recent assessm
ent revealed a lack of
understanding about the Council's vulnerability to clim
ate im
pacts
and the potential financial im
plications. 
Figure 14. Proposed carbon budgets and current em
issions pathway
Page 175

Page 176

Lack of data m
eans it is diffi
cult to estim
ate the cost to the Council
of clim
ate im
pacts, however as the Scottish Fiscal Com
m
ission
have outlined, ‘the im
plications of not investing in adaptation
would be harm
ful in the long term
and could lead to even m
ore
pressure on future Scottish Budgets’. Im
proved recording and
plans for detailed clim
ate change risk assessm
ent will lead to a
better understanding of likely future costs. 
An adaptation plan will be em
bedded within the upcom
ing Clim
ate
Change Strategy Update. The plan will set out how
adaptation can
be better incorporated into the Council’s organisational processes,
and its responsibility and influence on the wider area. This
includes m
echanism
s to facilitate adaptation in M
oray through
partnership working, planning policy, coastal change adaptation
plans, com
m
unity resilience plans and Nature Networks. 
The SNAP 3 places greater em
phasis on the interconnection
between clim
ate and nature, drawing close links to the delivery of
the Scottish Biodiversity Strategy and NPF4. W
ith the publication of
SNAP 3, the Council’s Clim
ate Change Strategy update will be able
to integrate the planned national outcom
es with local needs, as
well as develop m
easures that align with the national m
onitoring
fram
ework.   
44
Climate Change Plan and Route Map to Net Zero 2026 update
6.3
Restoring nature 
The Council's com
m
itm
ent to nature conservation has grown, but
future success hinges on securing new
funding sources and
integrating biodiversity efforts with other initiatives. W
hile
statutory targets and the uncertain future of Scottish Governm
ent
funding pose challenges, the Council plans to address these
through a new
M
oray Council Biodiversity Strategy, im
proved staff
training, and a focus on com
m
unity engagem
ent and evidence-
based actions. 
The level of nature positive activity taken by the Council has been
steadily increasing since the 2018-20 Biodiversity Duty report. The
publication of the Scottish Biodiversity Strategy Delivery Plan has
inform
ed the actions being developed within the Council’s
Biodiversity Strategy, including one for Council owned and
m
anaged greenspace, to have m
anagem
ent and m
aintenance
plans that reflect biodiversity and open space priorities. As further
guidance is produced by the Scottish Governm
ent on this action, it
will support the Council to m
anage m
ore areas of land with
biodiversity as a priority. The Scottish Governm
ent’s Natural
Environm
ent Bill m
ay lead to statutory targets for nature
restoration. This is likely to bring further responsibilities for local
authorities. 
In term
s of land m
anagem
ent, im
provem
ents largely relied on
dedicated funding through the Scottish Governm
ent’s Nature
Restoration Fund, which runs until 2025/26. There is a risk that
progress will slow
if this funding stream
is not renewed. Alternative
sources, including private finance and em
bedding biodiversity
within other projects such as the M
oray Growth Deal and town
centre im
provem
ents, will be essential. As the Council’s Natural
Page 176

Page 177

Capital Study recom
m
ends, carbon sequestration should also be
delivered in conjunction with biodiversity enhancem
ent. 
As the Draft Biodiversity Strategy m
akes clear, engaging
com
m
unities and increasing opportunities for young people to
engage with nature to bring additional benefits should be a
priority and support the sourcing of funding. A new
pilot project,
M
oray Clim
ate Ready Schools, started working with targeted
schools in 2025. The project is a partnership between the council
and environm
ental education charities W
ild Things and Nature 4
Health, and aim
s to deliver biodiversity enhancem
ents in school
grounds alongside providing clim
ate and nature learning
opportunities for pupils and staff. This project is ongoing with five
schools currently taking part. W
ider work to support all M
oray
schools to deliver quality outdoor learning and Learning for
Sustainability, includes the M
oray Growth Deal’s STEM
project and
planned outdoor learning centre. 
Statutory responsibilities for biodiversity have significantly
increased through the introduction of NPF4, introducing additional
work. Training will be offered to support the planning service to
deliver positive effects for biodiversity in M
oray while ecological
expertise will be drawn upon for larger and m
ore com
plex
developm
ents. W
ider engagem
ent with councillors, staff
and
developers is also needed to m
ainstream
these recent changes
and forthcom
ing new
Local Plan policies.   
45
Climate Change Plan and Route Map to Net Zero 2026 update
A significant challenge over the com
ing years will be the delivery of
the M
oray Nature Network, which is a requirem
ent of the LDP.
W
hile the Scottish Governm
ent has funded m
apping and
engagem
ent, delivery and m
onitoring will require additional
resources. This should be delivered through an integrated
approach, bringing wider com
m
unity benefits while also
supporting clim
ate adaptation and m
itigation. 
6.4
Sustainable developm
ent 
Actions which prom
ote sustainable change are included
throughout this report. These and other activities will be
considered for inclusion in the corporate annual Best Value Self-
Evaluation. Any possible alterations will be incorporated into the
next iteration of the Sustainability Statem
ent. There will also be
opportunities to scope out Partnership interest in shared
Sustainable Developm
ent priorities and actions in the Local
Outcom
es Im
provem
ent Plan (LOIP) Review.   
Page 177

Page 178

This report shows that M
oray Council continues to m
ake tangible
progress in reducing its carbon em
issions while delivering
essential services. Since the 2023/24 reporting year, the Council’s
em
issions have decreased by 7.7%.
The Council’s largest sources of em
issions rem
ain building heat,
fleet operations, and staff
com
m
uting. Reductions in fleet and
buildings are com
plex capital-intensive and constrained by the
Council’s budget pressures. Nevertheless, progress has been
achieved through estate rationalisation, energy effi
ciency
m
easures, renewable energy installations, and targeted fleet
electrification, often delivered through “spend-to-save” or
externally funded approach. W
aste em
issions have reduced
substantially following the m
ove away from
landfill, however,
waste prevention and increased recycling m
ust rem
ain priorities to
ensure long-term
sustainability. Encouraging m
ore sustainable
staff
travel continues to be challenging, often influenced by factors
such as high public transport costs and lim
ited tim
etables, the
need for flexibility, and a perceived lack of a consistent active
travel network.
Looking ahead, the national shift from
annual em
issions targets to
legally binding m
ulti-year carbon budgets represents a significant
change in policy fram
ework. These carbon budgets provide a m
ore
stable and realistic basis for planning, replacing year-on-year
targets that were vulnerable to short-term
fluctuations. 
46
Climate Change Plan and Route Map to Net Zero 2026 update
The Council can contribute to these targeted reductions by
adopting carbon budgets in the updated Clim
ate Change Strategy.
The Council’s current actions align with the first carbon budget
period, however, steeper reductions will be required in subsequent
periods to rem
ain within future budgets and achieve net zero by
2045.
M
eeting this challenge will require accelerating the
decarbonisation of building heat and fleet vehicles, strengthening
project readiness to secure external funding, and em
bedding
clim
ate m
itigation, adaptation and biodiversity considerations
across all services and investm
ent decisions. It is im
portant to
recognise that clim
ate change action is not an additional burden,
but an integral part of how
the Council services operate. Investing
now
will help to avoid higher costs in the future. Continued
leadership, partnership working and a strategic, budget-led
approach will be essential to ensure progress is m
aintained and
scaled in line with the new
carbon budget fram
ework.
The Just Transition Fund has considerable potential to build on
existing activity and stim
ulate new, innovative and structural
initiatives that can deliver lasting, carbon-neutral benefits for
people, place and the environm
ent.
Alongside efforts to reduce the Council’s own em
issions, it is
essential to continue preparing for a future in which clim
ate
im
pacts are expected to increase. Taking action to adapt now
will
help to protect com
m
unities and reduce costs in the long term
.
7.Conclusion
Page 178

Page 179

47
Climate Change Plan and Route Map to Net Zero 2026 update
8. Glossary
Active travel
(AT)    
Adaptation    
Baseline  
Biodiversity      
Carbon
Journeys m
ade by m
odes of transport that are
fully or partially people-powered, irrespective
of the purpose of the journey. It includes
walking, people using wheelchairs, cycling
(including e-bikes) to nam
e a few. 
Adjustm
ents in natural or hum
an system
s in
response to actual or expected clim
atic stim
uli
or their effects, which m
oderates harm
or
exploits beneficial opportunities. 
Historical period specified for the purpose of
com
paring greenhouse gas em
issions. 
The variability am
ong living organism
s from
all sources, including, inter alia, terrestrial,
m
arine and other aquatic ecosystem
s and the
ecological com
plexes of which they are part;
this includes diversity within species, between
species and of ecosystem
s (UN
1992). 
Um
brella term
used to describe all of the
greenhouse gases. 
Carbon
dioxide (CO 2)      
Carbon
neutrality 
Carbon
sequestration  
Circular
econom
y
Clim
ate
action  
Clim
ate
change    
A naturally occurring gas, CO
2
is also a by-
product of burning fossil fuels (such as oil, gas
and coal), of burning biom
ass, of land-use
changes and of industrial processes (e.g.,
cem
ent production). It is the principal
anthropogenic greenhouse gas that affects
the Earth’s radiative balance. 
See net zero.  
A process by which carbon dioxide is rem
oved
from
the atm
osphere and held in solid or
liquid form
.
A circular econom
y is one in which resources
are kept in use for as long as possible. 
Efforts taken to reduce greenhouse gas
em
issions (m
itigation) and respond to the
im
pacts of clim
ate change (adaptation) 
The state of the clim
ate that can be identified
(e.g., by using statistical tests) by changes in
the m
ean and/or the variability of its
properties and that persists for an extended
period, typically decades or longer. 
Page 179

Page 180

48
Climate Change Plan and Route Map to Net Zero 2026 update
Clim
ate
em
ergency
Co-benefits
Direct
em
issions
Drought
EV Energy
Com
pany
Obligation
(ECO)
A situation in which urgent action is required
to reduce or halt clim
ate change and avoid
potentially irreversible environm
ental dam
age
resulting from
it.
The positive effects that a policy or m
easure
aim
ed at one objective m
ight have on other
objectives, thereby increasing the total
benefits for society or the environm
ent. Co-
benefits are often subject to uncertainty and
depend on local circum
stances and
im
plem
entation practices, am
ong other
factors. Co-benefits are also referred to as
ancillary benefits.
Em
issions directly under the organisation's
control. Also referred to as Scope 1 em
issions.
A prolonged period of abnorm
ally low
rainfall,
leading to a shortage of water.
Electric vehicle; vehicle that runs on electricity,
provided by an internal battery.
The ECO4 Flex is a UK governm
ent schem
e
that requires large energy suppliers to help
households im
prove their energy effi
ciency
and reduce fuel poverty.
EES: ABS
Flood
Greenhouse
gas (GHG)
em
issions
Green
jobs
‘Energy Effi
cient Scotland: Area Based
Schem
es’ is a Scottish Governm
ent
program
m
e delivered by local authorities to
im
prove the energy effi
ciency of hom
es and
reduce fuel poverty. It provides direct and free
or heavily subsidised energy-saving m
easures
in targeted neighbourhoods, helping
households to lower their energy bills,
im
prove com
fort, and cut carbon em
issions. 
The overflowing of the norm
al confines of a
stream
or other body of water, or the
accum
ulation of water over areas that are not
norm
ally subm
erged. Floods include river
(fluvial) floods, flash floods, urban floods,
pluvial floods, sewer floods and coastal
floods.
Any gas that contributes to the greenhouse
effect by absorbing infrared radiation in the
atm
osphere.
Em
ploym
ent opportunities that contribute to
environm
ental sustainability. 
Page 180

Page 181

49
Climate Change Plan and Route Map to Net Zero 2026 update
HNSU
Heatwave
ICE
Indirect
em
issions
IPCC
The Heat Network Support Unit (HNSU)
supports the growth of large-scale heat
network projects in Scotland. It does this by
addressing key challenges in the pre-capital
stages of project developm
ent and building
capacity across the public sector to deliver
successful heat network projects through
grant funding and expert advice.
A heatwave is an extended period of hot
weather relative to the expected conditions of
the area at that tim
e of year. In M
oray, a
heatwave event is defined as at least three
consecutive days with daily m
axim
um
tem
peratures m
eeting or exceeding 25°C.
Internal Com
bustion Engines; vehicles that
drive on fuel such as diesel and petrol.
Em
issions outside the organisation's control
but over which it has an influence. Also
referred to as Scope 2 and Scope 3 em
issions.
Intergovernm
ental Panel on Clim
ate Change.
A scientific body established by the United
Nations to provide policym
akers with regular
assessm
ents of the state of clim
ate science
and the potential im
pacts of clim
ate change,
as well as strategies for m
itigation and
adaptation. 
Just
transition
LCLIP
LDP
LHEES
LPP
M
itigation
Nature
em
ergency
Ensuring that no one is left behind in the
transition to low-carbon and environm
entally
sustainable econom
ies and societies. 
The Local Clim
ate Im
pact Profile for M
oray
highlights the significant local clim
ate im
pacts,
including rising tem
peratures, increased
rainfall, and rising sea levels. The profile also
discusses the potential for sea level rises and
the im
pact on the environm
ent, food and
water supply, infrastructure, and the health of
the population. So far, one LCLIP has been
produced (in 2025) and covers 2018- 2023.
Local Developm
ent Plan
Local Heat and Energy Effi
ciency Strategy
Local Place Plans: Com
m
unity-led plans that
provide a fram
ework for shaping the future of
local places. Local Place Plans - M
oray Council
A hum
an intervention to reduce em
issions or
enhance the sinks of greenhouse gases.
The rapidly worsening state of the natural
world, including the loss of biodiversity,
ecosystem
degradation, and the threat of
ecological collapse, caused by hum
an
activities such as habitat destruction, pollution
and clim
ate change.
Page 181

Page 182

50
Climate Change Plan and Route Map to Net Zero 2026 update
A network which connects nature-rich sites,
including restoration areas and other
environm
ental projects, through a series of
areas of suitable habitat, habitat corridors,
and stepping-stones.
M
oray Nature Network - M
oray Council 
Net zero em
issions are achieved when
anthropogenic em
issions of greenhouse
gases to the atm
osphere are balanced by
anthropogenic rem
ovals over a specified
period. 
The practice of com
pensating for carbon
em
issions by funding projects that reduce
greenhouse gas em
issions outside of the
organisation's own landholdings. 
Public Bodies Clim
ate Change Duties 
Energy derived from
natural sources that are
replenished at a higher rate than they are
consum
ed. 
Scottish Clim
ate Intelligence Service 
Sets out how
Scotland will adapt to the risks
identified in the UK Clim
ate Change Risk
Assessm
ent. The plan includes actions that
fall under the Council’s responsibility, and
those it has a supportive role in addressing. 
Nature
network     
Net zero     
Offsetting    
PBCCD 
Renewable
energy  
SCIS 
Scottish
National
Adaptation
Plan
3 
(SNAP 3)
Scottish Environm
ent Protection Agency 
Photovoltaic (PV) solar technology converts
sunlight directly into electricity using solar
cells. 
M
eeting the needs of the present without
com
prom
ising the ability of future
generations to m
eet their own needs. 
Tonnes of carbon dioxide equivalent. A
m
etric m
easure used to com
pare the
em
issions from
various greenhouse gases on
the basis of their global-warm
ing potential
(GW
P), by converting am
ounts of other gases
to the equivalent am
ount of carbon dioxide
with the sam
e global warm
ing potential. 
Any uncontrolled vegetation fire which
requires a decision, or action, regarding
suppression. 
Zero Em
ission Fleet Replacem
ent Strategy 
SEPA 
Solar
Photovoltaics
(PV) 
Sustainable
developm
ent  
tCO 2e       
W
ildfire     
ZEFRS
Page 182

Page 183

51
Climate Change Plan and Route Map to Net Zero 2026 update
Page 183

Page 184

Page 184

Page 185

Moray Council Annual Climate Change Summary
Reporting period 2024-25
Key Takeaways
Total Council emissions for
2024-25
17055.6 tCO2e
Decrease in emissions since
2023-24
7.7%
Largest area of emissions:
Building heat
3963.4 tCO2e (23.2% of total)
Decrease in emissions since
baseline (2017-18)
45.8%
Emissions reduced by diverting
landfill to NESS EFW facility
8759.2 tCO2e
Electricity generated from solar
photovoltaic panels
53,616 kWh (up by 4%)
Emissions reduction progress to date • The Council’s emissions have fallen by 45.8% since the 2017-18
baseline.
• Some emissions categories, such as staff commuting emissions,
have only been recorded in recent reporting periods. To ensure a
consistent scope for the purpose of this report, estimated
historical emissions for these categories have been added.
• The most significant emissions reductions have come from
improvements in the disposal of non-recyclable waste, which was
previously sent to landfill but is now cleanly combusted to produce
energy.
• The areas of building heat and operational emissions have slightly
reduced, however building electricity and fleet have gone up
slightly.
Building Heat and Electricity
Sectoral Analysis
• The Council’s current largest emission source is providing heat to our buildings,
contributing to 23% of total emissions. While fuel oil / kerosene emissions have
fallen by 60% since the 2017/18 baseline, the Council remains dependent on
natural gas boilers for most building heat. Emissions from natural gas heating
has shown little decrease with gas boilers continuing to be installed and
replaced on cost grounds.
• Emissions from our electricity usage have fallen by 60% since baseline. This is
the combined result of the decarbonisation of the national grid, along with
energy savings from efficiency improvements and through solar PV installations
(see Case Study 1). However, electricity use in some areas are growing as new
uses such as more EV bus and cars and new electricity points at Buckie
harbour to replace generators.
Fleet
• The use of diesel in Council vehicles makes up 97% of our transport
emissions, and 21% of our total emissions.
• There has been no significant decrease in diesel consumption compared to
the baseline, with a small increase in the last reporting year, possibly due to
vehicles servicing new housing developments and M.Connect. Budget cuts
meant that around 20 vehicles were not replaced during 2024/25 at their
optimal replacement age. This has led to an ageing fleet with less fuel-
efficient vehicles, which naturally increases consumption.
• 6 EVs replaced 6 diesel cars, with financial benefits of £5,000 per year in fuel
savings and maintenance costs reduced by 75%. EV charging consumption
increased to 606,912 kWh in 2024/25, which is an increase of 11.5%.
• Small quantities of petrol are used in Open Spaces machinery, and marine
fuel in Council vessels.
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
Carbon emissions (tCO
2e)
Diese
l
Petrol
Gas
oil
(fleet)
Appendix 2
Page 185

Page 186

Waste
• The joint NESS Energy from Waste facility has resulted in a further
reduction in emissions from the Council’s waste operations over the past
reporting year.
• Nether Dallachy landfill site was still accepting commercial and
industrial waste during 2024/25 so these figures are still reported on.
With the closure of the landfill site these emissions will reduce further
next year.
• Other emissions from waste management include those incurred from
recycling and composting, now making up 6% of waste emissions.
Operational Activities
• Operational emissions have fallen by about 15% since the baseline in 2017/18. This
is mainly due to less staff commuting and less emissions from water supply and
treatment.
• Emissions from staff working at home have also been recorded since the pandemic,
accounting for the resulting additional heating and electricity usage outside Council
facilities.
• Emissions from corporate travel, which includes flights, rail journeys and grey fleet
milage (personal cars used for business purposes), have continued to increase
following a return to “business as usual” practices since the COVID pandemic.
Procurement and Investment
• The Council continues to deliver and record non-cash benefits
such as sustainability, climate change and community wealth
building through its procurement process.
• Only 4.08% of contractscommence2during the year included a
sustainabilitytarget(in comparison to 5.68% in the previous
reporting year). This falls short of the target of 20%.
• Of the contracts with identified environmental non-cash benefits,
8 related to greenhouse gas reduction, 4 for waste, 2 around
energy and 5 specifically support sustainable construction.
Case Study 2 – Connecting people with nature
through conservation activity
Case Study 1 – Solar PV on councilbuildings
Sustainability
• Sustainable development means meeting the needs of the
present without compromising the ability of future generations
to meet their own needs.
• All Public Sector Bodies must demonstrate how they are
progressing sustainable development as part of their Best Value
duties.
• The Council has approved a Sustainable Development
Statement in November 2024 which identified short-to-medium
term actions to ensure sustainability is embedded within the
Council’s plans and decision-making processes. This includes
guidance on how officers can include sustainable development
in the Implications Section of Committee Reports.
0
2,000
4,000
6,000
8,000
10,000
12,000
Carbon emissions (tCO
2e)
Landfill gas
Municipal refuse to
combustion
Commercial and
industrial waste to
combustion
Municipal refuse to
landfill
Commercial,
industrial and clinical
waste to landfill
Recycling and
composting
• The Council completed its first adaptation benchmarking report,
strengthening the monitoring of adaptation activities and gaps.
• A Local Climate Impacts Profile (LCLIP) for 2018–2023 was
produced in 2025, improving understanding of historical impacts
and potential future climate-related costs.
• SNAP 3, published in September 2024, now informs the Council’s
approach to adaptation, with its Nature Connects outcome
reinforcing the alignment of biodiversity and wider climate action.
• TheCouncil is a national leader on coastal change, applying an
innovative pathway approach through a Regional Coastal Change
Adaptation Plan and ten local plans.
• The Draft Biodiversity Strategy went out for public consultation in
2025.
• Ecological training wasprovided to Open Space operations teams to
supportprofessional knowledge around planting and management
practices.
• Moray Nature Networkmapping was completed in early 2025.
• New local guidance for biodiversity was approved,providing greater
clarity on how NPF4 policy 3 is to be applied in planning decisions.
• Preparation of the Local Development Plan 2027 and Biodiversity
Strategy2026- 2036continue to embed the Nature Network.
Climate Adaptation
Biodiversity
Procuredin August 2024 andcommissionedbetween April and June 2025, solar
photovoltaic (PV) panels have been installed on buildings at Ashgrove Depot. The
project was funded under a “spend to save” approach. To date, the system
hasoperatedsmoothly, generated electricity supporting lighting, workshop and office
activities, EV charging, and other general electricity demands. Surplus electricity is
exported to the grid. The system can bemonitoredremotely, enabling prompt
identification and resolution of any issues.
Investment: £56,432                      Payback Period: 4.3 years
Internal rate of return (IRR): 25.86%                     First-Year Savings: £11,932
Lifetime Savings (25 yrs): approx. £514,467
• Over 2024-2025, the Council partnered with Wild Things!
environmental education charity to progress action plans at
three sites the Council manages for nature;Millbuies, Elgin
Oakwood and the Wards.
• 59residents, including school groups and adult volunteers,
helped to:
• Plant approximately 200 native trees
• Remove 1,000 old tree protector tubes
• Remove large areas of invasive trees and plants
• Record wildlife sightings andsubmitthem
• Care for wildflower andwetlandareas
• Strong community engagement demonstrated a deep sense
of community care and concern for natural habitats.
Page 186

Page 187

Report to: Economic Development
and Infrastructure
Services Committee 
Meeting Date: 10 March 2026  
Report by: Executive Director Economy, Enterprise and Operations 
Authors: Rod Lovie
Tilia Maas Geesteranus 
Contact
Email:
Rod.lovie@moray.gov.uk 
Subject: Local Heat and Energy Efficiency Strategy (LHEES) Update 2026 
1.  PURPOSE 
☒For Decision      ☐  For Information 
1.1  The purpose of this report is to ask the Council to consider and approve the Local Heat
and Energy Efficiency Strategy (LHEES) Update 2026. This update provides insight into
current performance, identifies changes in the delivery plan, and outlines next steps
necessary for decarbonising heat in buildings and improving energy efficiency across
Moray within current budgets. The intention had been to provide an update in 2025, but
staff resources and other priorities has led to a delay in completing this report.  
1.2  This report is submitted to Council in terms of Section III (F) (33) of the Council’s Scheme
of Administration relating to providing, developing and monitoring the Council’s Economic
Development and Infrastructure Services. 
2.  SUMMARY  
2.1  Local Heat and Energy Efficiency Strategies (LHEES) are at the heart of a place based,
locally led and tailored approach to the heat transition. These local strategies underpin an
area-based approach to decarbonising heat in buildings and improving energy efficiency
across entire local authority areas. 
2.2 An update of the delivery of the actions within the LHEES is included in Appendix 1. A
number of these actions need to be altered or aligned with subsequent strategies since
the LHEES was agreed in 2024. A summary of this is included in Appendix 2. 
Item 14.
Page 187

Page 188

3.  RECOMMENDATIONS  
3.1  It is recommended that the Council:   
i)  approves the LHEES Update 2026, as detailed in Appendix 1, and the changes
to the delivery plan as proposed in Appendix 2; 
ii)  notes that while work will progress on the LHEES, many aspects of the
Delivery Plan cannot be met without external resources.   
Rod Lovie
Principal Climate Change Officer 
Tilia Maas Geesteranus
Climate Change Strategy Officer 
4.  BACKGROUND AND CONTEXT 
4.1 The Local Heat and Energy Efficiency Strategies (Scotland) Order 2022 places a duty on
Moray Council to prepare, publish and update a Local Heat and Energy Efficiency Strategy
and Delivery Plan. LHEES delivers area-based planning for the heat transition, supporting
achievement of statutory emissions reduction targets. It provides the basis for
decarbonising heat in buildings and improving energy efficiency across entire local
authority areas. 
4.2 The Moray LHEES Strategy and Delivery Plan was approved by the Council on 14 August
2024 (para 13 of the Minute refers). As noted within the Delivery Plan, several aspects of
work are undeliverable within existing resources. Work will focus on co-ordinating actions,
existing work and reporting to meet statutory requirements. A limited budget remains
available for further consultancy support over the next 4 years to support the LHEES
strategy and officers are continually seeking external funding to progress actions within
the strategy. 
5.  ACTIONS WITHIN THE DELIVERY PLAN 
5.1 The actions in the LHEES Delivery Plan are divided into seven priorities which are:  
Page 188

Page 189

LHEES covers the entire local authority area, and the actions were identified through
engagement internally within Moray Council and externally with key stakeholders. The
Delivery Plan represents the actions which key stakeholders believed were most integral to
progressing decarbonisation of heating and energy efficiency in Moray. 
5.2 An update of the delivery of the actions within the LHEES is included in Appendix 1. In
summary, the progress on actions by stakeholders include:
TMC - Strategic Planning and Development (SPD): SPD and Climate Change officers are
embedding LHEES priorities within the new Local Development Plan and aligning work
with national adaptation and resilience guidance. They have led significant engagement
with energy networks (notably SSEN), continue to progress feasibility work for heat
networks in Elgin, and supported exemplar low-carbon development through the Dallas
Dhu project. SPD has also contributed to research, innovation, and cross-council
coordination. Knowledge-sharing has been supported through targeted learning sessions,
including a “lunch and learn” on solar thermal solutions delivered in collaboration with
industry and academia.
TMC - Housing & Property: Housing & Property has made tangible progress in progressing
housing investment, particularly through programmes to bring all council housing up to
EPC C or better. Retrofit works are underway, including insulation and heating upgrades,
and all void properties are now upgraded to meet energy standards. They have also
Page 189

Page 190

delivered emissions reductions through LED lighting and solar PV installations across
council buildings.
TMC – Member Body: The Council Leader and Members have advocated at national level,
engaging with Ministers, MPs, and MSPs around Just Transition funding. This engagement
helps ensure Moray’s priorities are represented in wider policy and funding discussions.
Business Gateway Moray (BGM): Business Gateway Moray has supported green
economic development by building a comprehensive business database as part of
Community Wealth Building work and signposting businesses to Business Energy
Scotland for audits and green finance. They have contributed to workforce development
through their contribution to the Energy Workforce and Skills Summit and ongoing
collaboration with partners. 
Moray Local Employability Partnership: DYW Moray has improved awareness of green
jobs and learning opportunities among young people through a wide-ranging programme
of activities delivered in 2024–2025. These included careers fairs, mock interviews,
workplace visits, and employer-led engagement across numerous sectors. The
publication of the Green Report (August 2025) provides clear evidence of strong
engagement in sustainability-related pathways.
Moray CAN: Moray CAN has played a central role in community engagement and
capacity-building, commissioning delivery partners such as REAP and Community Energy
Moray and organising a well-attended climate change conference in October 2025. They
have consistently raised awareness through events, rural outreach, carbon literacy
training, and targeted engagement, helping communities feel more empowered to take
climate and energy action. They have led on the work to progress a regional climate
change strategy
NHS Grampian: NHS Grampian has begun embedding LHEES considerations by
establishing contacts across senior sustainability, facilities, and health intelligence roles.
While delivery activity is still developing, their engagement has helped identify
opportunities to better integrate fuel poverty and energy efficiency into health pathways. 
UHI Moray: UHI Moray has actively supported a just transition by working with regional
partners to identify skills and training needs linked to the energy transition. They are
collaborating with Moray Council on Just Transition bids such as’ Buildings for the Future’,
and Growth Deal projects which if successful would deliver infrastructure, education, and
training opportunities. This work positions Moray to better capture economic and
employment benefits from the transition to net zero.
SSEN: SSEN has engaged constructively with Strategic Planning and Development through
Local Development Plan preparation, infrastructure delivery meetings, and regular
information sharing including a presentation to members. This involvement has helped
identify potential capacity constraints early in the process. Wider consultations on future
local energy infrastructure are ongoing.   
Page 190

Page 191

6.  NEXT STEPS  
6.1  Feedback on what jeopardises further progress at pace is:
• Lack of clarity around future funding
• Late confirmation (with short spending window) of external funding allocation
• Amount of external funding (ECO4 ending and not being replaced)
• Clarity on some of the action points  
• Ensure ongoing alignment as other Council Strategies and their actions change (eg
Moray Housing Strategy and Climate Change Strategy). 
6.2  In general, the delivery of the actions in the delivery plan is constrained by funding
pressures and the need to balance competing investment priorities. Progress of many of
these actions is dependent on support from the Scottish Government. However, the
current funding arrangements, including short spending timescales and uncertainty over
future availability, make effective forward planning difficult. The Council’s largest area of
capital investment is the learning estate, where it must meet condition ratings set by the
Scottish Government that do not specifically relate to energy efficiency or
decarbonisation. Investment is being prioritised to address these given the Council’s
current position against these building condition ratings. 
6.3  Notwithstanding these funding concerns, there are opportunities ahead including funding
for heat networks, engaging with the Just transition Fund, opportunities for additional solar
projects and engagement with community energy groups. 
6.4  It is made clear in the LHEES that actions within the delivery plan will need to be updated
over time. This includes amending actions as projects are identified and feasibility studies
are concluded. Details of the changes needed to the delivery plan are included in
Appendix 2. The suggested changes can be categorised as follows: 
• Merging actions together if there is a reporting overlap
• Altering actions so they align with other strategies which have been updated
including the Climate Change Strategy and Housing Strategy.
• Change of wording to better describe the action
• Additional clarity and efficiency
• To get input from additional external organisations
• Include NHS as an action holder for the action ‘Building sustainable and climate
resilient communities’ to capture the link between health and housing issues. 
6.5  Officers will continue to meet with action owners, and potential new action owners, to
discuss and agree the proposed changes. The delivery plan will be amended to reflect the
changes and to align with other strategies. An overview of the necessary changes is
included in Appendix 2. If agreed, the exact wording of the revised delivery plan will be
approved by the Climate Change Board 
Page 191

Page 192

7 SUMMARY OF IMPLICATIONS  
7.1 The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) X 
Policy and Legal X 
Financial  X
Risk  X
Staffing  X
Best Value and Transformation  X
Property X 
Information Communications Technology/Digital             X
Equalities. Social Inclusion and Economic Impact   X
Climate Change and Biodiversity Impact           X 
7.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in Moray.
☒ Empowering and connecting communities.
☒ Improving wellbeing of our population   
7.3 Policy and Legal 
The Local Heat and Energy Efficiency Strategies (Scotland) Order 2022 places a duty on
Moray Council to prepare, publish and update a Local Heat and Energy Efficiency Strategy
and Delivery Plan at intervals not exceeding 5 years  
7.4 Financial 
There are no financial implications arising from this report. However, delivery of LHEES
will have significant financial implications for the Council and the Moray area. External
Page 192

Page 193

funding is being sought to progress actions within the strategy in line with policy guidance
on resourcing climate change actions through external funding. 
7.5 Risk 
Failure to plan for the decarbonisation of heating is a serious risk to the Council’s service
provision. It poses significant risks to our health, our economy, our environment and
endangers the wellbeing of current and future generations.  
7.6 Staffing
There are no changes to staffing implications arising from this report. However, the actions
of the LHEES are progressed by officers across the Council including property, housing,
planning, climate change, Business Gateway, and external partners  
7.7 Best Value and Transformation 
The LHEES aligns with sustainable development aspirations as per Best Value. 
7.8 Property 
The development of decarbonisation projects will impact on corporate buildings, council
landholdings and the learning estate.  
7.9 Information Communications/Technology/Digital 
No implications arising from this report.  
7.10 Equalities, Social Inclusion and Economic Impact 
While the LHEES focuses on alleviating fuel poverty (which positively impacts socio-
economic disadvantaged groups)and promoting local economic opportunities, there is no
negative implications directly arising from this report.  
7.11 Climate Change and Biodiversity Impacts 
The LHEES strategy can help to address the climate emergency by developing plans to
reduce carbon emissions from buildings in Moray. This report focuses attention on the
actions required to ensure that the Council meets its statutory obligations. 
8 CONSULTATION  
8.1 This report has been prepared in consultation with the Executive Director - Economy,
Environment and Operations, Head of Growth, Planning and Climate, Head of Housing,
Property and Communities, Service Manager Property, Estates & Assets, Service Manager
Housing Strategy, Energy Officer, and the Equal Opportunities Officer and any comments
made have been incorporated into the report 
Page 193

Page 194

Appendix 1: Update of Actions in the LHEES Delivery Plan 
Action
no.
Action Action
owner
Description Target / outcome Update 2026
Building sustainable and climate resilient communities
1.1 Support
community-led
energy efficiency
and adaptation
projects.
Moray CAN Continue to connect
to grant providers,
technical assistance,
and training
opportunities for
community groups
looking to lead on
energy efficiency and
adaptation projects
in their local areas.
1. Increased number of community-
led projects supported, and
carbon emissions saved through
these projects. 
2. Increased community skills and
capacity for climate action,
measured by workshops
attendance or volunteer hours.
Commissioning, signposting,
capacity-building and connecting
groups with delivery partners.
Moray CAN have commissioned
REAP (2024/25) to carry out energy
efficiency work in community
buildings across Moray.
An area-wide Climate Change
Strategy is being developed,
together with the Council’s Climate
Change Team, which could
function as a base for ongoing
initiatives. For that purpose,
workshops with stakeholders have
taken place end of 2025, and
finalising the Strategy is now taking
place. 
1.2 Encourage
formation of
community
energy
cooperatives.
Moray CAN Encourage the
formation of
community energy
cooperatives, where
residents collectively
invest in renewable
energy projects.
Doing so will
enhance community
resilience, generate
1. Number of new community
energy cooperatives established,
and MWh of renewable energy
generated. 
2. Investment attracted by
cooperatives from local residents
and organisations.
Moray CAN supports this through
awareness-raising and
connections. Though technical
development and delivery would sit
better with specialist community
organisations.
They have commissioned
Community Energy Moray to raise
awareness at community events,
sharing information directly with
Page 194

Page 195

clean energy and
empower
communities
economically and
socially.
the public and engaging
communities on local energy
issues.
1.3 Enhance
community
resilience within
local strategic
planning.
Strategic
Planning and
Development
(SPD)
Integrate climate
resilience
considerations into
Moray’s new Local
Development Plan.
Incorporate green
infrastructure, flood
resilience measures,
and passive cooling
strategies to future-
proof buildings and
communities against
the impacts of
climate change.
1. Integration of climate resilience
measures in new developments.
2. Increased awareness and
understanding of climate risks
and adaptation measures
amongst local planners and
developers.
LHEES will be cited within the new
LDP. 
New national planning guidance
around adaptation and resilience
places more emphasis on building
design incorporating resilience
measures to climate risks such as
overheating and flooding.
Maximising knowledge and awareness and ensuring certainty of success
2.1 Improve
knowledge
amongst staff
and
stakeholders.
Moray
Council
Heads of
Service
Continue to
participate in and
facilitate access to
relevant training
sessions,
conferences,
workshops and other
knowledge sharing
events between
industry, experts, and
council officers to
improve knowledge
on energy efficiency
1. Increased participation of staff in
training sessions and other
knowledge sharing events. 
2. Improved knowledge and
understanding of energy
efficiency and heat
decarbonisation measures
amongst all staff which is kept up
to date. 
3. Development of internal capacity
to support LHEES
implementation effectively.
Board meetings are taking place
regularly, which are attended by
Service Managers. Action points
related to energy efficiency are
discussed. 
A Leadership Forum in December
2025 focused on Climate Change. 
A lunch and learn was carried out
on solar thermal as a solution to
damp problems. This was a
collaboration between industry and
academics.
Page 195

Page 196

and heat
decarbonisation. 
2.2 Undertake
education and
awareness
campaigns
Moray CAN Launch public
education
campaigns to raise
awareness about the
importance of energy
efficiency and
sustainable heating
practices. Engage
schools, community
groups, and local
media to promote
behaviour change
and empower
individuals to take
action in their homes
and workplaces.
Raise awareness of
climate change and
build capacity for
adaptation and
mitigation actions.
1. Increased public awareness of
climate change, energy
efficiency, sustainable heating
practices and the need for
behavioural change and action. 
2. Demonstrable changes in
attitudes and behaviours towards
energy conservation and
sustainable heating solutions,
identified through case studies
and surveys. 
3. Increased engagement in LHEES
initiatives and community-led
projects. 
4. Members of the public indicate
that they feel empowered to take
action in their homes and
workplaces.
This aligns well with Moray CAN’s
ongoing engagement, events,
communications and community
outreach. The website contains
information when there are funding
opportunities. Moray CAN
organised a climate change
conference on the 3rd of October
2025, which was attended by nearly
a hundred attendees, attracted
various high-profile speakers, local
organisations and institutes that
presented their ongoing work. 
Moray CAN organised various
events in rural areas and invited
speakers from Home Energy
Scotland (HES) and Cycling UK.
2.3 Ensure
retrofitting plans
are aligned
between Council
and Registered
Social Landlords
Housing &
Property
Host and participate
in joint meeting with
Registered Social 
Landlords (RSLs) to
align social housing
retrofit plans in the
future.
1. Consistency and coherence in
retrofitting approaches across
Council and RSL building stock. 
2. Alignment of decarbonisation
engagement approaches to
simple communication and
encourage tenant buy-in to
sustainable solutions.
The Local Housing Strategy has
been at consultative draft stage
since September 2025, and the
draft is currently available on the
website at: 
Housing Strategies, Policies and
Performance - Moray Council
Significant stakeholder
engagement was carried out prior
Page 196

Page 197

to publication of the consultative
draft. 
“LHS Priority 4:  Improving property
condition and achieving affordable
warmth is enabled in all homes” is
relevant to LHEES.
2.4 Support research
on public
attitudes
towards
renewable
technologies in
Moray
Strategic
Planning and
Development
Support ongoing
research at UHI on
local public attitudes
towards renewable
technologies through
facilitating
interviews, data
sharing and provision
of expertise.
1. Publication of research findings
on public attitudes towards
renewable technologies. 
2. Development of
recommendations based on
research findings to inform
ongoing Moray LHEES strategy.
3. Increased understanding of
public concerns and preferences
to guide effective communication
and engagement strategies.
The Council is supporting a Master
of Research project at UHI. This is a
longer-term research project which
is ongoing. Council officers have
been interviewed and are
contributing to the research.
2.5 Raise awareness
of LHEES in
Moray
Strategic
Planning and
Development 
Undertake
engagement
sessions with the
public and
businesses as part of
the Local
Development Plan
development
process.
1. Number of engagement sessions
conducted with different groups. 
2. Increased understanding of
LHEES priorities and actions, and
enhanced sense of strategy
ownership amongst
stakeholders, measured by
annual pulse survey. 
3. Identification of stakeholder
concerns and suggestions to
inform LHEES development.
It is cited within the new LDP and
SPD which will be looking to
support opportunities for heat
networks going forward.
Moray CAN Conduct deeper
engagement with
community
representatives,
environmental
groups, and industry
experts can provide
Ongoing community engagement,
events and communications
focused on energy, behaviour
change and climate awareness. 
Page 197

Page 198

valuable insights and
foster ownership of
the strategy among
diverse stakeholders.
Hosting public
forums and
workshops to
facilitate meaningful
dialogue and
increase community
buy-in.
A just transition for the energy system
3.1 Identify
communities
and workers
most impacted
by the energy
transition
UHI Moray Conduct mapping
and assessments to
understand the
specific needs and
challenges of
communities and
workers reliant on
industries affected by
the transition.
1. Identify communities and
workers most impacted by the
transition, with detailed profiles
and needs assessments.
UHI Moray continue to work with
stakeholders across the region to
identify training and curriculum
opportunities related to the energy
transition. They are working with
Moray Council on a joint Just
Transition bid as well as a Growth
Deal bid which if it is successful,
will deliver new infrastructure to
ensure that Moray is best placed to
take advantage of the opportunities
the energy transition will bring and
to support accessible education
and training for a sustainable,
inclusive economy.
UHI Moray proposes to reword this
action.
3.2 Establish a Just
Transition Fund
to support
affected
Scottish
Government
Provide a dedicated
funding programme
in Moray to support
infrastructure
1. Increased investment in
impacted communities, job
creation, reduced reliance on
fossil fuels for energy needs, and
Progress is being made to submit a
moray wide comprehensive bid to
the Just Transition Fund. This will
include community energy,
Page 198

Page 199

communities
and businesses
upgrades, economic
diversification
initiatives, and
community-led
projects.
diversification of local
economies
buildings retrofit, and elements of
training.
3.3 Promote fair
work practices
and working
standards in the
renewable
energy sector
Scottish
Government
Facilitate the
development of
industry-wide
agreements on fair
wages, trade union
recognition, worker
safety, and training
opportunities in the
renewable energy
sector.
1. Improved labour standards and
working conditions in the
renewable energy sector. 
2. Workers are incentivised to make
the transition.
No specific update, works ongoing. 
Supporting a wellbeing economy, jobs and skills
4.1 Encourage green
startups and
diversification of
existing
businesses
Business
Gateway
Moray (BGM)
Provide business
support to new start-
ups and existing
businesses in Moray.
1. Increased number of green
startups launched and
established businesses
expanding. 
2. Creation of new green jobs in
Moray.
Business Gateway Moray is
demand-responsive to what local
businesses request in terms of
support and knowledge sharing.
There have been minimal enquiries
regarding green or sustainable jobs
in the past year and a half, however,
financial viability of businesses is
always relevant, which could be
linked to carbon reductions and
saving expenditures.
4.2 Provide
dedicated
support to
encourage green
business
Business
Gateway
Moray
Provide a programme
of support to green
start-ups and existing
businesses,
delivering
opportunities for
1. Attraction of investment in green
businesses and innovations.
Business Gateway Moray has been
developing a database containing
information on local businesses
and their characteristics as part of
the Community Wealth Building
role. 
Page 199

Page 200

development in
Moray
collaboration and
upskilling.
Administer green
start-up and
equipment grants for
areas specified as
required in Moray.
Business Gateway Moray are part of
the Moray Workforce Planning
Group who recently organised and
held an Energy Workforce and Skills
Summit. This work is progressing to
include developing a routemap for
delivery of the outcomes of the
summit. 
BGM regularly refer clients to
Business Energy Scotland’ service
as they have a loan fund available
for ‘green’ purposes.
They also have resources and
access to an adviser to conduct an
audit of the business to provide
guidance on energy saving options.
Business Energy Scotland · Make
your business greener
HIE has introduced new criteria
that for any business looking for
support from HIE they will need to
have started their journey to net
zero. 
Businesses are referred to Business
Energy Scotland by HIE as the audit
can be used for this purpose.
4.3 Improve
awareness of job
and learning
opportunities
associated with
LHEES
Moray Local
Employability
Partnership / 
Developing
the Young
Work with employers
and industry
associations to
connect individuals
with green job and
1. Growth in participation in LHEES-
related job and learning
opportunities. Monitored using
enrolment figures in relevant
courses, apprenticeships, jobs
and training initiatives. 
A Green Report (Aug 2025) has
been distributed, showing a variety
of ‘green / sustainability activities’
which took place in 2024 and 2025,
organised for youth only. They
involved mock interviews, careers
Page 200

Page 201

Workforce
Moray (DYW)
learning
opportunities.
2. Improved employer engagement.
Employers are actively involved in
promoting and offering LHEES-
related jobs and learning
opportunities. 
3. Increased awareness of
opportunities as surveys
demonstrate improved
understanding and interest in
LHEES career paths.
fairs, workplace visits, and similar
activities, delivered with employers,
through DYW. They covered the
following sectors: 
• Manufacturing 
• Education
• Construction, 
• Public administration and
defence; compulsory social
security, 
• Financial and insurance
activities, 
• Arts, entertainment and
recreation, 
• Electricity, gas, steam and air
conditioning supply,
Agriculture, forestry and fishing
• Professional, scientific and
technical activities
• Mining and Quarrying
• Water supply, sewerage, waste
management and remediation
activities
• Human health and social work
activities
Business Gateway Moray are part of
the Moray Workforce Planning
Group who recently organised and
held an Energy Workforce and Skills
Summit. This work is progressing to
include developing a routemap for
Page 201

Page 202

delivery of the outcomes of the
summit. 
DYW Moray are part of the Local
employability partnership (LEP) -
Moray Pathways. Therefore,
probably makes more sense for
future to provide one joined up
response from the LEP, as
potentially there are other partners
that could input on this.
Tackling fuel poverty and improving health
5.1 Identify non-
domestic
buildings with
largest potential
energy savings
Strategic
Planning and
Development
Analyse building data
to identify those with
the largest heat
demands, engage
with the building’s
owner and
propose/support a
high-level energy
efficiency analysis.
These buildings may
offer the largest
impact from energy
efficiency
improvements.
1. Top 10% of non-domestic
buildings by heat demand
identified and initial engagement
completed.
Due to capacity, this has not yet
started and will be done together
with GIS manager who will be
available from April 2026 onwards. 
5.2 Improve building
management
systems
Housing &
Property
Accelerate ongoing
works to improve
building
management
systems in all public
buildings where
appropriate, to more
1. Improvement in building energy
performance in public buildings.
The Council has seen an overall
reduction in emissions from
electricity use, which mainly is the
result of the decarbonisation of the
national grid, along with energy
efficiency improvements such as
Page 202

Page 203

accurately monitor
and improve building
performance.
LED lighting replacement and the
installation of solar panels. 
LED lighting can reduce electricity
consumption by between 40% to
60% compared to older fluorescent
bulbs. These last longer and have
lower maintenance costs.
Replacements have taken place at
Council HQ, HQ Annexe, Ashgrove
Depot, and Buckie sports pitches. 
Solar PV projects on the rooftops of
Ashgrove Depot, Council HQ, HQ
Annexe and Elgin Library are now
complete.  Further energy and cost
reductions could be achieved with
the wider rollout of similar spend-to-
save projects, particularly through
widespread adoption of solar PV
panels.
5.3 Conduct ongoing
stakeholder
engagement with
gas and energy
networks
Strategic
Planning and
Development
Continually engage
with SGN and SSEN
to ensure effective
strategic planning.
1. Energy network infrastructure
plans are aligned with LHEES
plans and priorities.
The engagement SPD has had with
SSEN has primarily been through
the preparatory work for the
Proposed Plan. SPD had an
information sharing event in May
which SSEN attended and held an
Infrastructure Delivery  Group (IDG)
meeting prior to this which SSEN
also attended – the purpose of
these was to inform SSEN of the
spatial strategy scenarios and
potential sites (RAG) so that they
Page 203

Page 204

could inform SPD if there were any
capacity issues, and that
interventions / mitigation can be
put in place by SSEN (i.e. the
infrastructure-first approach
advocated by NPF4). 
The IDG is held every 6 months and
SSEN are always invited to these
(both Transmission and
Distribution). Planning Officer has
had meetings with the Climate
Change Team over the course of the
year with SSEN and also sends the
HLA to SSEN to inform them of
anticipated build outs.   
Officers have also been engaging
with NESO over their developing
plans to future proof the national
grid.
5.4 Align existing
investment and
asset
management
plans with
LHEES
Housing &
Property
Review existing
investment and asset
management plans
to target energy
efficiency
improvements of
buildings within the
Council’s portfolio.
1. All existing investment and asset
management plans aligned with
LHEES objectives.
In relation to the Council’s houses,
the Council is required to meet
standards set by the Scottish
Housing Regulator which include
energy efficiency requirements and
will likely include decarbonisation
requirements in the future. 
In line with Housing Investment
Improvement Plan, approved at
Committee in May, programmes of
work have been developed to bring
all properties up to EPC C or better.
Page 204

Page 205

On site work has commenced with
works being undertaken by Council
in house delivery (DLO) and external
contractors. Works include
insulation, heating replacements
and kitchen upgrades. 
All properties which become void
will have works undertaken to bring
up to EPC C and be in line with
Scottish Housing Regulator
requirements.
5.5 Create energy
efficiency
improvement
plans for council
owned buildings
Housing &
Property
Conduct energy
efficiency audits of
all relevant council
owned buildings and
produce
improvement plans
which demonstrate
potential carbon and
financial savings.
1. 100% of council owned buildings
with energy efficiency
improvement plans
The aim is to reach EPC rating C or
better (B and A). 
This action is picked up in action
5.4 above.
5.6 Conduct ongoing
internal
engagement
within the
Council
Strategic
Planning and
Development
Continue to engage
with council sections
to streamline the
approach to delivery
of LHEES information
and energy reduction
strategies.
1. Increased awareness and
understanding of LHEES
objectives across all relevant
council services, measured by
pulse surveys.
This action is picked up in action
2.1 above
5.7 Understand the
decarbonisation
Moray CAN Build upon
engagement work by
identifying and
1. Engagement evidence report
produced which will inform future
LHEES iterations.
No specific update on this. 
This action point should be passed
on to a new action owner as it does
Page 205

Page 206

plans of large
organisations
engaging with large
organisations which
are known to have
several properties or
a high energy
demand, to
understand their
decarbonisation
plans and any
support they may
require.
not reflect the work covered by
Moray CAN
5.8 Develop a fund
for initial
homeowner/
private landlord
retrofit surveys
Scottish
Government
Develop a fund for
initial retrofit surveys
which is accessible
to all homeowners
and private landlords
to remove this initial
barrier to action.
1. Funding secured and initial
homeowner / private landlord
retrofit survey programme
launched.
No specific update, works ongoing. 
5.9 Create retrofit
and new build
living exemplars
and showcase to
the public and
developers
Strategic
Planning and
Development
Develop retrofit and
new build exemplar
buildings as part of
the Moray Growth
Deal to demonstrate
the potential for
fabric retrofit, battery
storage, solar PV,
insulation, heat
pumps, and other
innovative measures
to work effectively.
Host showcase
events at the
buildings as a
1. Two exemplar buildings
completed and showcased to the
public and developers. Lessons
learned shared to inform future
LHEES iterations and national
building and planning policy.
Dallas Dhu project is an innovative
collaboration between Moray
Council and Altyre Estate, with
Grampian Housing Association and
the Glasgow School of
Art. Fraser/Livingstone Architects
was awarded the contract in early
2023 to design phase one of the
Dallas Dhu housing development.
Phase 1 of Dallas Dhu consists of
24 affordable homes, 40-bed
student accommodation, Custom
Build Housing Opportunities (4
serviced plots) and a Housing
Innovation Area.  
Page 206

Page 207

learning opportunity
for the public and
developers.  
An energy and heating strategy was
developed for the 24 affordable
houses. 
Key features of the energy strategy
include: 
-High thermal efficiency across
building envelope.
-High efficiency heating systems
served by exhaust air source head
pump technology. 
-Mechanical ventilation with heat
recovery.
-High efficiency lighting.
-Provision of rooftop solar PVs to
meet a portion of the houses’
electricity demand. 
Design work is underway to develop
a ‘mini-masterplan’ and to design 2
housing units within the housing
innovation area which will work
upon the existing energy strategy
and aims to use locally sourced
timber and more broadly, try to
build the homes without using any
concrete or cement or
plastics/polythene layers.
Opportunities to include retrofit
exemplars to be explored in the Just
transition retrofit project which is
seeking funding.
Page 207

Page 208

5.10 Review and
develop heritage
buildings and
unconventional
construction
guidance
Strategic
Planning and
Development
Develop user friendly
guidance for heritage
and unconventional
building owners.
Consolidate existing
resources, explain
acceptable
improvements, and
outline available
financial support to
empower them to
navigate energy
efficiency and heat
decarbonisation
while respecting
unique building and
site characteristics.
1. Guidance made available for
owners of heritage and
unconventional building owners. 
2. Increase in funding applications
(and planning applications where
applicable), demonstrating
progress in decarbonisation
efforts.
The topic of wooden windows was
raised as appeals were being
overturned at Local Review Body
(LRB). Since then, there has been a
change to permitted development
rights so householders can put in
more upvc windows in
conservation areas than previously 
Improving the energy efficiency of building
6.1 Promote energy
literacy and
behavioural
change
Moray CAN Continue to provide
education and
resources to
empower people to
use energy more
efficiently and make
informed choices
about their energy
consumption.
1. Increased awareness of energy-
saving methods.
Moray CAN are tailoring Carbon
Literacy training to be more locally
relevant, including delivering a
sports-focused Carbon Literacy
course with Buckie Thistle FC.
6.2 Strengthen
healthcare
interventions
NHS
Grampian
Ensure healthcare
professionals
routinely identify and
address fuel poverty
as a social
determinant of
1. Reduced incidence of health
problems associated with cold
homes.
Contacts have been made with a
variety of NHS Grampian
professionals, such as Head of
Health Intelligence & Learning
Health Systems (in that capacity
also chairing the sustainable city
Page 208

Page 209

health. Integrate fuel
poverty support into
medical care and
social prescribing
programmes.
group in Aberdeen), Director of
Facilities and Sustainability in NHS
Grampian, and Environmental
Manager for NHS Grampian. 
In terms of updates on their work in
relation to LHEES, they mainly
added that the action point could
be made more specific or SMART in
order to report to more effectively. 
6.3 Increase support
for low-income
households
Scottish
Government
Implement targeted
grants, benefits, and
top-ups to energy
bills for those most in
need.
1. Reduce the number of
households in fuel poverty in line
with national targets.
No specific update, works ongoing. 
6.4 Advocate for
policy and
regulatory
change
Moray
Council
Leader
Lobby for stronger UK
and Scottish
government policies
to regulate energy
prices, reform the
energy market,
protect vulnerable
consumers, and
invest in renewable
energy solutions.
1. Secure specific policy changes
and government funding
commitments.
No specific update, works ongoing.
Engagement with Minister, MPs and
MSPs over the just transition
funding.  
6.5 Invest in
research and
innovation
Strategic
Planning and
Development
Develop and test new
technologies and
solutions as part of
the Moray Growth
Deal to make energy
more affordable and
accessible,
particularly for
1. Case studies produced
highlighting lessons learned from
Moray Growth Deal projects.
As part of the Dallas Dhu project,
Moray Council has engaged BE-ST
(Scotland’s National Innovation
Centre for Construction and the
Built Environment) to provide
expertise and advice throughout
the project which will then support
future housing developments.
Page 209

Page 210

vulnerable groups.
Compile case
studies and present
findings to Scottish
Government. 
Decarbonising building heat source
7.1 Designate Moray
heat network
zones
Strategic
Planning and
Development
Designate within
local planning policy
the heat network
zones identified by
the Moray LHEES
Strategy. Publish
statement in
accordance with
Heat Networks
(Scotland) Act 2021
and review in no
more than 5 years
from date of
publication.
1. Heat network zones are
designated for Moray,
encouraging increased use of this
method of heat decarbonisation. 
2. Statutory obligations within the
Heat Networks (Scotland) Act
2021 are met.
The proposed heat network in Elgin
is not far enough advanced to
designate the area of central Elgin
as a heat network zone. The request
for formal designation will take
place at the appropriate time if the
project progresses.
Have engaged with officers from
LAs who are at a more advanced
stage.
Heat Network Zones do not have to
be designated as part of the LDP
setting process but can happen
later. 
7.2 Identify existing
electricity grid
capacity to meet
heat
decarbonisation
requirements
SSEN Conduct
comprehensive
assessments of grid
capacity and
potential upgrades
needed to support
widespread
electrification of
heating.
1. Identified areas with sufficient
capacity for heat decarbonisation
requirements. 
2. Need assessment and projected
costs of infrastructure upgrades.
SSEN and NESO are carrying out
consultations on shaping the future
of local energy infrastructure. Work
ongoing.
7.3 Develop and
implement
financial
incentives for on-
Scottish
Government
Introduce grants,
rebates, or tax breaks
to encourage
homeowners and
1. Increased number of non-
domestic properties with heat
pumps installed.
No specific update, works ongoing.
SHG Heat and Energy bill delayed.
Page 210

Page 211

grid heat pump
installations
businesses to switch
to electric heat
pumps.
7.4 Targeted support
for low-income
households and
vulnerable
communities
Scottish
Government
Provide additional
financial assistance
and access to
information and
resources for low-
income households
and vulnerable
communities
transitioning to low-
carbon heating
solutions.
1. Reduction in fuel poverty. No specific update, works ongoing. 
7.5 Facilitate the
development
and expansion of
heat network
Scottish
Government
Provide regulatory
support, funding, and
technical assistance
for communities to
establish or expand
district heating
networks fuelled by
renewable sources.
1. Increased number and capacity
of heat networks in Moray.
No specific update, work through
HNSU ongoing. Legislation on heat
network licencing, permits and
consents being progressed by
Scottish Government. 
7.6 Facilitate
opportunities to
advance heat
network
opportunities in
Moray
Strategic
Planning and
Development
Collaborate on
project development
and implementation
of heat networks in
Moray identified
within the LHEES,
and as designated as
heat network zones.
1. Opportunities to develop heat
networks in Moray are realised.
Work is progressing on the
feasibility studies for heat network
in central Elgin. Funded through
HNSU, a feasibility study has been
carried out and is being
complimented by an addendum
looking into utilising waste heat,
community energy and calculating
the costs to buildings of
decarbonising their heat without a
heat network. This addendum
Page 211

Page 212

should be completed April 2026
and reported to Council in summer. 
Page 212

Page 213

Appendix 2: Changes to the Delivery Plan 
Based on the feedback received of various action owners, some of the action points need clarification or alteration. Changes will be
agreed with action owners.  Suggested changes to the action points at this time are:
Number Priority / Action Suggested amendment
1.1 Priority: Building sustainable
and climate resilient
communities
Embed prevention in healthcare pathways (including nature-based solutions) to reduce the need
for healthcare where it is avoidable. 
Reason: Include NHS as an action holder for this priority to include these additional aspects.
1.2 Action: Encourage formation of
community energy cooperatives
Moray CAN facilitate support such as awareness raising and community engagement, but
specialist organisations would take care of implementation. Moray CAN remains an action holder,
but explore adding local energy community groups, such as Community Energy Moray and Zero
Carbon Moray to this action.
Reason: to get input from organisations who are delivering this work.
2.1 and
5.6
Action: 
2.1 Improve knowledge amongst
staff and stakeholders
5.6: Conduct ongoing internal
engagement within the Council
Investigate merging or rephrasing the actions.
Reason: duplication.
2.3 Action: Ensure retrofitting plans
are aligned between Council
and Registered Social Landlords 
Rephrase the action as well as the targets, and align with the Local Housing Strategy, priority 4
(Improving property condition and achieving affordable warmth is enabled in all homes) and its 4
sub-actions. 
Reason: alignment with other updated strategies.
3.1 Action: Identify communities
and workers most impacted by
the energy transition 
Wording of the action could be rephrased to better represent UHI Moray's role in supporting
Moray's workforce related to the energy transition.
Reason: change of wording.
3.2 Action: Establish a Just
Transition Fund to support
affected communities and
businesses
Wording of the action should be rephrased to better reflect its current position (change Establish
to Progress).
Reason: change of wording.
Page 213

Page 214

4.3 Action:  Improve awareness of
job and learning opportunities
associated with LHEES
Change Action owner to LEP Moray Pathways.
Reason: additional clarity and efficiency.
5 Priority: Tackling fuel poverty
and improving health
Within each individual action point as part of this priority, it should be made clear, if not already,
what type of property is meant. 
Reason: additional clarity and efficiency.
5.2, 5.4
and 5.5
Action: 
5.2: Improve building
management systems
5.4: Align existing investment
and asset management plans
with LHEES
5.5: Create energy efficiency
improvement plans for council
owned buildings 
Investigate merging or rephrasing the actions. 
Reason: duplication.
5.3 and
7.2
Action:
5.3: Conduct ongoing
stakeholder engagement with
gas and energy networks
7.2: Identify existing electricity
grid capacity to meet heat
decarbonisation requirements 
Investigate merging or rephrasing the actions. 
Reason: duplication.
5.4 Action: Align existing investment
and asset management plans
with LHEES 
Reference should be made to Scottish Housing Regulator requirements which would link directly
to the CC Board Action 1.4 (Achieve Energy Efficiency Standard for Social Housing (EESSH) for all
council owned houses)
Reason: additional clarity and efficiency.
5.7 Action: Understand the
decarbonisation plans of large
organisations
Moray CAN mainly work with communities and social enterprises. The Climate Change team will
investigate if HIE or REAP can take on this role. 
Reason: to get input from organisations who are delivering this action.
6.2 Action: Strengthen healthcare
interventions
Various suggestions from NHS to improve the current action point have been made. They will be
investigated in due course. 
Page 214

Page 215

Reason: change of wording.
3.2
3.3
5.8
6.3
7.3
7.4
7.5
Action:
3.2: Establish a Just Transition
Fund to support affected
communities and businesses
3.3: Promote fair work practices
and working standards in the
renewable energy sector
5.8: Develop a fund for initial
homeowner/ private landlord
retrofit surveys
6.3: Increase support for low-
income households
7.3: Develop and implement
financial incentives for on-grid
heat pump installations
7.4: Targeted support for low-
income households and
vulnerable communities
7.5: Facilitate the development
and expansion of heat network
Action owner is Scottish Government. Work in all cases is ongoing, but will check with Climate
Change Board if it is helpful for LHEES to include national information.
Reason: additional clarity and efficiency. 
Page 215

Page 216

Page 216

Page 217

Report to: Economic Development
and Infrastructure
Services Committee 
Meeting Date: 10 March 2026  
Report by: Executive Director Economy, Enterprise and Operations      
Author: June Burnett Contact Email: June.burnett@moray.gov.uk 
Subject: Tourism Strategy for Moray 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to present the draft “Moray Tourism 2036 – Our Ten-Year
Strategy” and to seek approval to undertake a 6-week public consultation, alongside
partner feedback from the Moray Economic Partnership (MEP).  The report also sets out
how the Committee will be updated following the conclusion of the consultation.  
1.2  This report is submitted to Committee in terms of Section III (F) (28) of the Council’s
Scheme of Administration relating to promoting Tourism development in Moray.  
2.  SUMMARY  
2.1  Moray Tourism 2036 – Our Ten-Year Strategy sets out a new place-based and community-
powered approach to tourism development over the next decade.    
2.2  The Strategy moves beyond destination marketing to focus on stewardship, co-ordination
and wellbeing, recognising tourism as a contributor to community prosperity,
placemaking, skills, cultural vitality and environmental responsibility rather than a
standalone sector.  
2.3  The Strategy reflects extensive engagement with businesses, communities and
stakeholders across Moray and informed by national policy, evidence and global tourism
trends, the strategy responds directly to the strengths, challenges and aspirations of
Moray’s businesses and communities.  
2.4  The Strategy, Moray Tourism 2036 – Our Ten-Year Strategy, is presented in Appendix 1.  
2.5  Alongside the Strategy, three standalone but interlinked documents have been produced
to provide supporting context and guidance. These documents – How We Got Here, The
10-Year Strategy Explained and Guidance for Delivery – are included as background
papers.  
Item 15.
Page 217

Page 218

3.  RECOMMENDATIONS 
3.1  It is recommended that Committee:   
i)  considers the draft Moray Tourism 2036 – Our Ten-Year Strategy;   
ii)  agrees that the draft Strategy proceed to a 6-week public consultation via
Moray Engage;   
iii)  notes that the draft Strategy will also be considered by the Moray Economic
Partnership (MEP) both before the consultation period and in nearly final
format subsequent to the consultation period; and   
iv)  agrees that a final Strategy, reflecting all consultation and partner feedback,
will be reported back to this Committee for approval in June.   
June Burnett
Development Officer 
4.  BACKGROUND AND CONTEXT  
4.1  Tourism is a significant contributor to Moray’s economy, supporting approximately 2,900
jobs and generating an estimated £189 million annually. Moray benefits from strong global
brands, including Speyside whisky, golf and heritage assets, alongside a highly loyal
domestic visitor market with one of the highest repeat-visit rates in Scotland.  
4.2  The previous Tourism in Moray Strategy covered the period to 2025 and has now
concluded. In parallel, the Tourism Business Improvement District (TBID), Visit Moray
Speyside, was unsuccessful with their renewal ballot in March 2025, resulting in the
closure of the BID.  Without a destination management organisation (DMO) in place, there
is a recognised gap in coordination and promotion of the area.  The unsuccessful renewal
ballot occurred at the same time as Visit Moray Speyside was in the process of preparing
to commission a new tourism strategy, and this work did not progress.  
4.3  In response to the conclusion of the previous strategy and the closure of the TBID, Moray
Council assumed responsibility for procuring a new long-term tourism strategy.  Funding
for its development was secured from the UK Shared Prosperity Fund, Highlands & Islands
Enterprise (HIE) and Visit Moray & Speyside Ltd to support its development and the tender
process completed during August 2025.  The Information Report to Council on 3
December 2025 set out the tourism strategy as a key element within the Stage 1 process
for considering the potential introduction of a Visitor Levy in Scotland.  
4.4  The Strategy has been developed by SCOTO CIC using their industry knowledge, Press
Pause® methodology and informed by a three-month engagement programme comprising:
• an online survey;
• seven area-based workshops;
• six themed online forums; and
• a strategic business session along with Moray Chamber of Commerce and
business members  
4.5  More than 300 individuals and organisations contributed over 480 hours of engagement,
ensuring the Strategy reflects local capacity, challenges and ambition.
Page 218

Page 219

4.6  The Strategy aligns strongly with national and local policy, including Scotland Outlook
2030, the Place Principle, community empowerment legislation, responsible tourism
priorities, the Moray Economic Strategy, Moray Growth Deal, Moray Climate Strategy,
Moray’s Routes, the Local Development Plan and Local Place Plans.   
5.  PROPOSALS  
5.1  Moray Tourism 2036 – Our Ten-Year Strategy provides a clear long-term framework for a
place-based, community-powered approach to tourism development across Moray.  
5.2  Key elements of the Strategy include:
• A Clear Vision
• Guiding Principles
• Strategic Pillars
• Guidance for delivery, including a phased delivery plan  
5.3  The Guidance for Delivery is not a defined or fixed pathway. It is guidance providing a
practical starting point and a solid foundation that can adapt and evolve over time to
reflect emerging priorities, available resources, funding and collaborative approaches.  
5.4  Subject to Committee’s agreement, the Strategy will be issued for public consultation to
ensure that communities, stakeholders and the wider visitor economy have the
opportunity to comment.  
5.5  If agreed, a 6-week consultation period will be undertaken using the Council’s established
engagement platform, Moray Engage.  
5.6  The draft Strategy will also be submitted to the Moray Economic Partnership (MEP) to
gather strategic partner feedback both before and after the 6-week consultation period.  
5.7  The Strategy will also be used to support the Stage 1 pre-consultation on the potential
introduction of a Visitor Levy in Moray. A Tourism Strategy is required at this stage to set
out priorities and provide context on the types of activity and investment that could be
supported should a levy be taken forward.  This ensures the pre-consultation is informed,
transparent and aligned.  
5.8  At the end of the consultation period, all feedback will be reviewed and incorporated
where appropriate.  
5.9  A final version of the Strategy will be brought back to this Committee for consideration and
approval.  
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) X 
Page 219

Page 220

Policy and Legal X 
Financial X 
Risk X 
Staffing X 
Best Value and Transformation  X
Property  X
Information Communications Technology/Digital  X
Equalities. Social Inclusion and Economic Impact  X 
Climate Change and Biodiversity Impact X 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☒ Improving wellbeing of our population 
6.3  Policy and Legal 
The Council assesses support for economic development initiatives on their individual
merits, guided by the objectives of facilitating sustainable economic growth and achieving
the outcomes set out in the Ten-Year Plan and Corporate Plan.  The development of a new
Tourism Strategy represents an important step forward for Moray, following the conclusion
of the previous strategy in 2025, by providing an up-to-date strategic framework to guide
tourism development, partnership working and future decision-making  
6.4  Financial 
Funding will be required to deliver the Strategy. There is no ask of funds from Moray
Council, and no funds are currently budgeted within the Council for delivery.  A phased
delivery model and emphasis on collaboration and partnership working means that
funding may potentially be secured through a combination of approaches:
• External Funding - applications to appropriate national and regional programmes
will be pursued to support implementation.  External sources currently
administered by the Council which could contribute to aspects of delivery include
the Crown Estate Coastal Communities Fund. Some potential sources of bid-
based funding include the Regeneration Tourism Infrastructure Fund (RTIF) for
suitable projects identified in the Moray’s Routes strategic investment plan, and
the National Lottery Heritage Fund.
• Blended Model - delivery will rely on a mix of public sector contributions through
Page 220

Page 221

external grants, partnership funding and contributions, and if ultimately approved
by Members, potentially through a visitor levy scheme.
• Council Role - the Council may act as lead applicant for certain funding streams
where appropriate.
• Officer Support - Council officers could potentially play a key role in supporting
partners to develop and submit funding applications. 
In addition, funds may be available from Visit Moray & Speyside Ltd (VMS), where surplus
BID funds remain subject to their governance arrangements. Any decision on the use of
these funds’ rests entirely with VMS, and it is hoped that a clearer position will be available
by the time the final Strategy is reported back to this Committee.
It is important to note that the funding landscape evolves quickly.  As projects are
prioritised, suitable funding opportunities can be sought to support delivery. 
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend this
Year
Virement
From
Other
Comments       
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments       
6.5  Risk 
Identified risks include:
• Lack or Loss of Momentum – with limited coordination in place, there is a risk that
momentum cannot be built or may be further eroded without early action, leading
to a potential decline in stakeholder confidence.
• Insufficient Coordination - fragmented efforts could limit impact.
• Funding Uncertainty - delivery depends on a blended funding model.  Delays or
shortfalls in securing funding could stall progress.
• Volunteer Fatigue- heavy reliance on community effort without support may reduce
capacity.
• Digital Visibility Gaps - delay in relaunching Moray’s digital presence risks
competitiveness and market visibility. 
While these risks cannot be removed entirely, they can be mitigated through the guidance
for delivery set out in the Strategy which includes interim governance arrangements,
phased delivery, early digital relaunch, and clear funding roadmap.  
6.6  Staffing 
Staffing implications at this stage relate to the delivery of the public consultation and the
subsequent analysis of feedback.  This will require input from both the Economy and
Enterprise Team and the Corporate Communications Team.
Support from the Economy and Enterprise Team can be accommodated within existing
resources, provided current staffing levels are maintained and workload is prioritised
Page 221

Page 222

accordingly.
At the time of writing the Corporate Communications Team does not have capacity within
existing resources to support the promotions and communications activity, including
press releases, social media content and website updates, however a recruitment
process is underway, which may help address some of this capacity gap.
Future staffing implications associated with the delivery of the Strategy will be reviewed
and reported as required.
6.7  Best Value and Transformation
The Strategy promotes collaboration, and supports efficient, place-based delivery. It
aligns with Best Value principles by embedding continuous improvement, partnership
working, and community empowerment.
6.8  Property
Nothing arising from this report.
6.9  Information Communications/Technology/Digital
Nothing arising from this report.
6.10  Equalities, Social Inclusion and Economic Impact
The Strategy embeds inclusive growth, accessibility, fair work, and community benefit
among its core principles. It aims to improve access for all abilities, strengthen local
supply chains, and create fair employment opportunities across Moray. 
An Integrated Impact Assessment will be undertaken prior to the final Strategy being
brought back for Committee for approval.
6.11  Climate Change and Biodiversity Impacts
Tourism can cause carbon emissions through transport, accommodation etc. The impacts
of climate change as well as the impacts of higher tourist numbers can place stress on
vulnerable areas of nature and the environment.  The environment of Moray is a main
factor behind the decision of many to visit the area and to experience the beauty of our
coasts, forests and mountains.
Stewardship, climate action and nature recovery are integral to the Strategy, supporting
Moray’s climate and biodiversity commitments.
7. CONSULTATION
7.1  This report has been prepared in consultation with Executive Director Economy, Enterprise
and Operations; Chief Financial Officer; Head of Growth, Planning and Climate (Chief
Planning Officer); Head of Operations and Environment; Service Manager Legal Services;
Service Manager Economy and Enterprise; Service Manager Strategic Planning; Senior
Communications Officer and Development and Lissa Rowan, Committee Services Officer
and any comments made have been incorporated into the report.
8. BACKGROUND PAPERS
8.1  Moray Tourism 2036 - How we Got Here
Moray Tourism 2036 - The 10-Year Strategy Explained
Moray Tourism 2036 - Guidance for Delivery
Information Report - Development of Visitor Levy Scheme Timeline
Page 222

Page 223

MORAY
TOURISM
2036
Our Ten Year Strategy
Connected. Supported. Promoted
January 2026
Appendix 1
Page 223

Page 224

This document forms the primary and first in the
portfolio of four strategic documents:
1.Moray Tourism
2036 - The 10 Year Strategy
2.Moray Tourism
2036 - How
We Got Here
3.Moray Tourism
2036 - The 10 Year Strategy Explained
4.Moray Tourism
2036 - Guidance for Delivery
2 | Moray Tourism
2036 | The 10 Year Strategy
Moray Tourism
2036 | The 10 Year Strategy | 3
WELCOME
TO
OUR
STRATEGY
Contents
Moray Tourism
2036
This strategy marks a fundamental rewrite of how
tourism
is planned, led and experienced across
Moray. It is built from
community insight, local
knowledge and lived experience, ensuring a high-
quality visitor experience and that every action
begins with and benefits the businesses and people
who call Moray home.
By appraising local capacity and capability, then
centring on inclusion, collaboration and place-
based decision making, the strategy champions a
model where tourism
strengthens local services,
supports local enterprise and enhances everyday
life and prospects. Success is defined by delivering
clear, realistic and lasting benefits for all.
Moray Tourism
2036 has been developed through
an extensive engagement programme including
an online survey, seven area-based Press Pause®
workshops, six on-line themed forums, interviews
with partner organisations and a strategic meeting
with Moray Chamber of Commerce and business
members. More than 300 people contributed their
time, experience and insight, committing over 480
hours to informing the strategy and articulating a
shared ambition for tourism
in Moray.
Drawing on this lived experience, SCOTO
CIC
has synthesised these insights into a coherent,
place-led tourism
strategy that builds on Moray’s
distinctive strengths while addressing key gaps
and pressures. At its heart is a quiet yet confident
narrative that reflects Moray’s people and places,
and positions tourism
as purposeful, connected
and grounded in local reality.
Developed in the absence of a formal destination
organisation, Moray Tourism
2036 addresses
both the what and the how. Early emphasis is
placed on re-establishing effective leadership and
coordination, strengthening collaboration and
enabling a shared narrative for Moray that can be
confidently and collectively owned and amplified.
This Strategy is aligned with national, regional and
local priorities for sustainable economic growth,
climate responsibility and community wellbeing.
It supports wider ambitions to strengthen Moray’s
economy, protect and enhance its natural and
cultural assets, and ensure that growth delivers
lasting benefit for people and place. Tourism
is
positioned not as a standalone sector, but as a
contributor to wider outcomes across enterprise,
skills, culture, land, nature and communities.
Fundamentally, the strategy calls for a shift in
mindset away from
tourism
as something that
simply happens in Moray, towards an approach
that is shaped with Moray. Collaboration is central,
bringing communities, businesses and partners
together around shared priorities and a clear
understanding of what success looks like.
3
WELCOME TO
OUR STRATEGY
4
OUR TOURISM
STRATEGY ROOTED IN
MORAY’S IDENTITY
6
A STRATEGY FOCUSED ON
PEOPLE, PLACES & PURPOSE
9
THE OPPORTUNITY
10
WHAT IS HOLDING MORAY BACK?
14
THE CASE FOR CHANGE
16
OUR SIX STRATEGIC PILLARS
18
OUR PRIORITY MARKETS
20
MORAY’S EXPERIENCE CLUSTERS
22
COLLABORATIVE MARKETING & PRODUCT DEVELOPMENT
23
GUIDANCE FOR DELIVERY
24
OUR STRATEGIC FRAMEWORK
26
OUR EIGHT DELIVERY FRAMEWORKS
27
OUR PHASED DELIVERY PLAN
28
MEASURING OUR SUCCESS
30
MORAY SPEAKING FOR ITSELF
Page 224

Page 225

MORAY 
SPEAKING
FOR 
ITSELF
“MORAY ISN’T
LOUD – 
IT WHISPERS.
BUT IF YOU 
LISTEN
CLOSELY,
IT TELLS THE
KIND OF 
STORY THAT
STAYS WITH
YOU...”
Moray stands at an important moment.
Following the closure of Visit Moray Speyside in
2025, stakeholders across the region; communities,
volunteers, businesses, land managers, cultural
organisations and national partners, voiced a
unified message:
Moray has enormous potential, but its strengths are
not yet connected, coordinated or confidently
communicated.
“Moray isn’t loud – it whispers.  
But if you listen closely,
it tells the kind of story that stays with you...”
Moray is not Scotland’s loudest destination and that
is part of its charm, and its strength. It is a place to
slow
down, delve deeper and return often. A place
where people, nature and culture flourish together
and where visiting feels like a privilege.
Moray does not demand attention.
It earns it.
Slowly, warmly, deeply.
This shared narrative becomes the anchor for how
Moray speaks to Scotland, the UK and the world -
just as importantly, how
the people of Moray speak
about themselves with confidence and pride.
This tourism
strategy is grounded in a narrative
that reflects Moray as it truly is:
Welcoming towns 
and villages
Creative communities
and deep heritage
Calm, restorative
landscapes
Exceptional craftsmanship
in whisky and food
Quiet excellence and
authenticity
4 | Moray Tourism
2036 | The 10 Year Strategy
Moray Tourism
2036
Moray Tourism
2036 | The 10 Year Strategy | 5
Page 225

Page 226

A STRATEGY FOCUSED
ON
PEOPLE,
PLACES & PURPOSE
Moray Tourism
2036 focuses on strengthening
connection between visitors, communities,
businesses and places; providing practical support
for those shaping the visitor experience; and
promoting Moray through a clear, shared narrative
that can be confidently communicated by all.
This vision is rooted in:
• 
Community empowerment
• 
The wellbeing economy
• 
Stewardship, responsibility and sustainability
• 
Collaboration and partnership
• 
Pride of place
OUR MISSION
The mission for the next decade is:
To build a joined-up, inclusive and resilient visitor
economy rooted in local identity, community
involvement, meaningful local benefit and
environmental stewardship, enabling every
enterprise and place in Moray to contribute
confidently to a shared story and shared
prosperity.
OUR VALUES
This vision and mission reflect Moray’s desire to be:
• 
Balanced —
growing shoulder seasons, not   
summer pressure, encouraging dispersal across 
the destination, respecting local capacity and 
capability
• 
Connected —
linking coast and mountains,   
whisky and culture, nature and towns into one 
living story
• 
Fair —
offering fair work and ensuring 
communities, volunteers and small enterprises 
feel real benefit
•
Creative —
celebrating Moray’s makers, 
languages, heritage and festivals
• 
Caring —
protecting the landscapes, wildlife, 
coastlines and communities that define the   
region
• 
Confident —
presenting a clearer, bolder 
narrative of who Moray is and connecting with our
neighbouring destinations where visitors 
originate from
OUR
VISION
By 2036, Moray will be
recognised as a leading
example of place-based,
community-powered,
responsible tourism. 
A place where outstanding
global brands and local
enterprise thrive together
and tourism
enriches
local life, strengthens
communities, enhances
and celebrates nature and
culture, and offers visitors
meaningful experiences
across all seasons.
6 | Moray Tourism
2036 | The 10 Year Strategy
Moray Tourism
2036
Moray Tourism
2036 | The 10 Year Strategy | 7
Page 226

Page 227

OUR 
GUIDING 
PRINCIPLES
MORAY’S GUIDING
PRINCIPLES: SHAPING
DECISIONS AND ACTION
A Joined-Up
Place Led
Proposition
- Connecting
Moray’s hidden
assets with its
global brands;
linking place
and people as
one coherent
destination.
- A collegiate,
agile and
transparent
destination
management
model that
represents
businesses,
communities,
global brands
and volunteer
groups.
A Renewed
Place
Narrative
- Rooted in
Moray’s
landscapes,
people, culture,
creativity, and
contrasts.
- A strong,
place-rooted,
cohesive story
guides how
Moray presents
itself and how
businesses
and  
communities
collaborate
translating into
authentic
memorable.
experiences.
A Confident
Foundation
For Enterprise
And Prosperity
- Creating an
environment for
enterprise to
invest and grow
with clarity and
confidence.
- Tourism
empowers
businesses and
communities to
invest with
confidence,
supporting fair
work, skills and
a resilient
workforce.
A W
ellbeing
Economy Lens
- Tourism
as a
driver of 
local pride, 
resilience,
and fair work
balancing
people, places
and profit.
- Tourism
growth
should be
supported by
the essential
infrastructure
that serves both
residents and
visitors.
Communities
As Partners
Not Spectators
- Recognising
local
organisations,
charities, social
enterprises and
volunteers as
essential
contributors.
- Visitors feel
connected
through
authentic, 
placebased
experiences
developed
collaboratively
and delivered
by proud local
people.
Stewardship
First
- Tourism
that
strengthens
everyday life,
protects 
Moray’s
landscapes and
delivers long-
term
value for
communities,
businesses and
visitors.
- Growth is
paced to local
capacity,
with investment
in infrastructure,
environment
and visitor
management
coming before
promotion.
THE OPPORTUNITY
Available STEAM
data which is modelled year on
year highlights that Tourism
in Moray already
contributes:
The latest VisitScotland visitor survey suggests
Moray enjoys Scotland’s highest repeat-visit rate
(91%). This loyalty is a remarkable asset.
Tourism
is clearly an established and important part
of the local economy although what remains
unknown is how
much of that spend stays in the
local economy, how
many jobs are living wage and
permanent jobs, and what motivates the repeat
visits. Moray Tourism
2036 provides the platform
for
ensuring tourism
doesn’t just happen in Moray, but
brings tangible benefits to the people, businesses
and communities of Moray and is a net contributor
and not a net extractor.
2,900 jobs
stable across several years
£189m
in annual economic value
8 | Moray Tourism
2036 | The 10 Year Strategy
Based on the extensive
engagement from
businesses, communities
and key stakeholders
the strategy focuses on
six guiding principles.
These build on current
capacity, capability and
lived experience and set
a renewed place-based
framework for growth and
prosperity.
Moray Tourism
2036 | The 10 Year Strategy | 9
Page 227

Page 228

WHAT IS HOLDING
MORAY BACK?
MORAY’S EVOLVING
PLACE
W
ITHIN
SCOTLAND’S TOURISM
LANDSCAPE
Moray has for many years been largely subsumed by
wider tourism
geographies and consequently has
been on the fringe – on the edge of the Highlands, of
Aberdeen and Aberdeenshire and of the Cairngorms
National Park.
Some domestic visitors are deeply aware of Moray’s
appeal and return regularly, often through family
connections or long-standing relationships with the
area. High-end international visitors, particularly
those exploring Scotland’s whisky, golf and country
sports offer, do arrive in Moray, but frequently as
part of a wider itinerary, with relatively limited 
dwell time.
For most others Moray is easily bypassed whether
heading north to Inverness, the NC500 and the west
highlands or stopping short at Cairngorms or
Aberdeenshire and not venturing that bit further. 
For many. Moray remains less visible, less
understood and less clearly defined as a destination
in its own right.
A STRUCTURAL GAP IN
DESTINATION
LEADERSHIP AND
COORDINATION
These challenges have been amplified by the
closure of Visit Moray Speyside following the
unsuccessful renewal ballot for the Tourism
BID in
March 2025.
While cohesive destination management was
emerging, the loss of the Destination Marketing
Organisation has created a significant gap in
leadership, coordination and collaboration.
Destination marketing activity has largely ceased,
established digital platforms are no longer
proactively managed, and there is no focal point
for collective action, engagement with the travel
trade or joined-up promotion. Events and initiatives
continue to take place, but without a shared
framework to connect effort, resources or impact
DESTINATION 
COMPETENCE
A locally led, place based SCOTO
Press Pause®
appraisal of Moray’s destination competence
highlighted these issues clearly. Exploring 20 criteria
across 13 communities and their hinterland and
drawing on lived experience and local perception,
the appraisal explored how
Moray’s many places
currently “do tourism”, identifying strengths and
catalysts for growth alongside gaps and weaknesses
that limit destination readiness. Each criterion is
scored through facilitated conversation as a red,
amber or green. Red indicates a major weakness -
the criteria doesn’t exist or is not functioning. Amber
indicates where improvement is needed and green
suggests all is well and this is a local strength.
The findings consistently pointed to issues
of capacity, capability, coordination and
collaboration, rather than shortcomings in the
quality of Moray’s offer.
Refer to Moray Tourism
2036 - How
We Got Here
10 | Moray Tourism
2036 | The 10 Year Strategy
“THE FINDINGS
CONSISTENTLY
POINTED TO
ISSUES OF
CAPACITY, CAPABILITY,
COORDINATION
AND
COLLABORATION,
RATHER THAN
SHORTCOMINGS
IN
THE QUALITY OF
MORAY’S OFFER.”
Moray Tourism
2036 | The 10 Year Strategy | 11
Page 228

Page 229

TOURISM
TRADITION
Deep-rooted hospitality and heritage tradition
with a contrasting mix of coastal holiday parks
fishing villages and traditional hunting, shooting,
fishing, golf and whisky – however, not cohesive and
underpromoted
ARTS, CULTURE & HERITAGE
High-quality and notable historic connections and
experiences; active arts scene; current notable
investment programme; under-promoted
W
ILDLIFE & NATURE
High-quality coastal, river and woodland
habitats with excellent trails and wildlife spotting
opportunities; dark skies exceptional; under-
promoted
FEATURES & ATTRACTIONS
A decent range of significant natural and built
features of interest and attractions – under-
promoted and not joined up
VISITOR ACCOMMODATION
Quality has been improving; notably holiday parks
on coast; lost some self-catering units; limited
luxury/group options for travel trade; major impact
on availability from
demand for workers
FOOD & DRINK 
High-quality local produce; extensive distillery-
related experiences; good day time café culture;
limited fine dining and evening options
EVENTS & FESTIVALS
Vibrant local community-based events: some long-
standing region-wide activity which helps stimulate
collaboration; lack of a joined-up calendar of events
and programming
MAKERS & PRODUCERS
Good base across the region with art and food
producers; NEOS annual event and a range of
galleries and craft shops in town and villages but
overall lack of consistency
TRAVEL & CONNECTIVITY
Patchy public transport for visitors to move around
especially in rural areas; M-Connect has improved;
good rail access in Elgin and Keith linking to
Inverness and Aberdeen; very limited taxi options
RETAIL
Strong luxury shopping offer in a few
locations;
strong independent retail offer in smaller towns;
Elgin lagging with several empty units in the centre
AMENITIES & INFRASTRUCTURE
Good availability of basic services and amenities
across the region. Visitor infrastructure is ageing and
uneven across the towns; car park charging in some
but not all locations; toilets are a key concern
COMMUNITY ASSETS
Impressive volunteer led portfolio in key locations –
eg Forres, Cullen, Findhorn and the Cabrach; less
evident in other locations; significant potential
PEOPLE & PLAYERS
Key locations enjoy dedicated, creative, resilient
volunteer activity but fatigue issues evident in many
communities; demise of VMS has left a vital
leadership gap and opportunity
SENSE OF PLACE
Strong locally in general but fragmented regionally;
several places and place names not well known or
understood outwith the region; Moray is a relatively
new
entity and does not yet have a cohesive identity
ACTIVITIES & EXPERIENCES
Strong potential for varied water and land-based
activities and emerging focus on agritourism
experiences; weak coordination, packaging and
visibility
VISITOR INFO
& SIGNAGE
Universal frustration with inconsistency; several
examples of community led visitor information
provision filling gaps and offering potential; signage
is generally poor and inconsistent
DIGITAL PRESENCE & MARKETING
Some strong local platforms and individual business
activity; major concern that VMS digital presence is
still live but no longer proactively managed and its
future is unknown
CLIMATE ACTION
Mixed EV roll out, reliability and awareness – needs
coordination; only some towns and communities
have climate action plans; no entries on the
Tourism
Cares map, 20 Green Tourism
accredited
accommodation providers and attractions in Moray
INCLUSION
& ACCESSIBILITY
Minimal all-access and inclusion provision/
welcome; scope for region wide approach and
collaborations/itineraries
DESTINATION
COLLABORATION
Major structural gap especially since VMS closure;
concern VMS model wasn’t inclusive for community
interests; collaboration within individual towns/
communities is inconsistent and is weak across
Moray
SCOTO
PRESS PAUSE® DESTINATION
COMPETENCE APPRAISAL
Local strength
Improvement needed
Major weakness
COMPETENCY RATING
12 | Moray Tourism
2036 | The 10 Year Strategy
Moray Place by Place
Press Pause® Destination
Competency Appraisal 2025
Moray Tourism
2036 | The 10 Year Strategy | 13
Page 229

Page 230

THE CASE FOR
CHANGE
OUR CORE INSIGHT
When time is taken to understand Moray, it
becomes clear that the region already has the core
ingredients of a compelling destination. Moray has a
long-standing tradition of tourism
and hospitality, a
strong sense of place at a local level, and a rich
mix of natural, cultural and heritage assets that are
intrinsic to the area and deeply valued by those who
live and work here.
Across Moray’s towns, villages and landscapes
there are notable strengths in tourism
tradition,
arts, culture and heritage, wildlife and nature. The
area offers a diverse and contrasting mix of coastal
holiday parks, beaches and fishing harbours, rural
towns and villages, rivers and forests, hills and
mountains, traditional country sports, golf and a
globally recognised whisky sector.
Moray benefits from
exceptional building blocks
that do not need to be created or imported. Its
landscapes are calm
and restorative, its food
and drink offer is of high quality, its cultural and
creative endeavour is active and evolving, and its
communities demonstrate strong volunteer effort,
pride of place and commitment to welcoming
visitors.
Moray is therefore a destination which has
exceptional assets across its geography, but it is
currently on the fringe, is under-connected, under-
promoted and under-supported. A destination
which lacks its own cohesive and coherent narrative
and identity of its own. Inspiration and information
are inconsistent across the visitor journey, and
there is no clear, shared narrative to help visitors
understand how
Moray fits together as a place to
explore, stay and return to.
Moray’s key weaknesses therefore lie not in what
if offers but in how
it operates and how
it presents
itself to the outside world. While collaboration
within some towns and communities is strong,
collaboration between communities, and between
local interests and external partners, is uneven and
often limited.
Addressing these gaps requires a new, place-led
approach to leadership and collaboration, enabling
Moray to connect its assets, build confidence
and function as a coherent destination in its own
right offering an authentic and high-quality visitor
experience.
MORAY’S REGIONAL IDENTITY
Engagement revealed practical tension rather than
deep division around how
Moray is presented.
Businesses often favour Moray Speyside for its
whisky equity, international recognition and digital
search value, while residents and community
groups tend to prefer Moray for its inclusivity,
simplicity and alignment with the council area. 
This strategy moves beyond the debate by
positioning Moray as the unifying regional identity,
recognising Speyside as one globally recognised
strand within a broader, more diverse destination
story.
Positioning Speyside alongside Moray’s Coast,
Heritage, Culture, Nature and Warm
Community
Spirit within a single, cohesive brand allows the
strategy to honour world-renowned strengths
without any single theme dominating, offering
visitors multiple ways to discover and engage while
reflecting the region’s genuine diversity.
EVIDENCING
THE VALUE OF
TOURISM
IN
MORAY
While available data provides a strong picture of
Moray’s domestic and repeat visitor markets, there
is currently limited and inconsistent data relating
specifically to premium
and international visitors.
Much of what is understood about these markets
is drawn from
proxy indicators such as whisky
tourism, golf, country sports and high-end retail,
alongside anecdotal evidence from
businesses and
lived experience rather than robust, destination-
level intelligence.
This data gap limits Moray’s ability to clearly
evidence the scale, behaviour and value of premium
and international travel, reinforcing the need for
improved data capture, shared insight and stronger
connections with the travel trade as part of the
Strategy’s early actions.
Moreover, the data that does exist is modelled and is
limited to the ‘size’ of tourism
in terms of footfall,
overnight stays and spend whereas data that
demonstrates how
tourism
is benefitting Moray’s
communities, businesses and environment will
ensure it is perceived as a force for good.
LOCAL AMBITION
AND
READINESS FOR CHANGE
Realistic optimism
was evidenced across all
stakeholder engagement. There is confidence in
Moray and stakeholders are seeking destination
leadership, a joined-up game plan, an enabling
framework for enterprise, investment and growth,
a clear, consistent and compelling narrative,
and investment in destination coordination and
collaboration.
W
HY CHANGE IS NEEDED NOW
Moray is entering a period of renewed opportunity.
Strategic public and private investment are
underway and increasingly focused on place,
infrastructure, culture, food and drink and visitor
experience.
In addition, Moray is home to several globally
recognised brands whose reach and reputation
contribute to the area’s international profile and
appeal. This Strategy seeks to better integrate these
global assets with Moray’s wider visitor economy,
strengthening connections with local businesses,
food and drink producers, cultural organisations
and communities. Better connecting these assets
and enterprises offers the potential to translate
global appeal into more locally rooted benefit.
Together, these factors make clear that Moray does
not need to reinvent itself as a destination. What is
required is a new, place-led approach to leadership,
collaboration and storytelling—
one that connects
Moray’s existing assets, people and ambition into a
coherent and confident whole, and ensures tourism
works for Moray rather than simply happening to it.
The key to unlocking Moray’s future
and realising its potential as a distinct
destination in Scotland lies
with the people and the businesses of
Moray coming together with one voice
and one game plan.
14 | Moray Tourism
2036 | The 10 Year Strategy
Refer to Moray Tourism
2036 - How
We Got Here
Moray Tourism
2036 | The 10 Year Strategy | 15
Page 230

Page 231

OUR SIX 
STRATEGIC 
PILLARS
THE HEART OF THE STRATEGY –
W
HAT W
E FOCUS ON
Six principles translate Moray’s shared values
into practical behaviours that will guide decision-
making, investment, product development and
leadership over the next decade.
They reflect local lived experience while aligning
with the national shift toward value-led, place-
based and wellbeing-focused tourism
set out in
Scotland Outlook 2030 and related strategies.
MORAY’S PILLARS FOR ACTION
Leadership &
Coordination
- A light-touch,
inclusive,
enabling model
that reconnects
and drives
Moray.
- Purpose
Rebuild 
inclusive,
trusted
destination
leadership.
- Early Priorities
Establish 
Tourism 
Leadership
Group; interim
coordination
team; strategic
partnerships.
- Outcome by
2036
A sustainable,
community-
rooted
destination
body with clear
accountability.
Identity, Brand
& Promotion
- A compelling
narrative that
ties Moray’s
places and
assets together
to inspire
responsible
visits that
resonate
and connect.
- Purpose
Create a clear,
shared
narrative for
Moray.
- Early Priorities
Agree core
story; stabilise
digital
presence;
unified events
calendar.
- Outcome by
2036
A confident,
coherent
identity
consistently
communicated
by all.
Enterprise &
Investment
- An inspirational
framework to
support Moray’s
enterprises,
people and
places to grow
with confidence
and purpose.
- Purpose
Enable local
enterprise to
grow
with
confidence and
purpose.
- Early Priorities
Support
bookable
experiences;
strengthen local
supply chains;
skills and fair
work focus.
- Outcome by
2036
A resilient,
diverse visitor
economy
rooted in local
benefit.
Community
Benefit &
Resilience
- Meaningful
connection
between
visitors,
communities
and
enterprise
empowering
Moray’s people
and places to
flourish.
- Purpose
Ensure tourism
strengthens
everyday life
in Moray.
- Early Priorities
Community-
led priorities;
smallscale
enabling
investments;
volunteer
support.
- Outcome by
2036
Visible social,
cultural and
economic
benefit for
communities.
Visitor
Experience &
Dispersal
- Shaping
Moray’s
visitor offer to
support
responsible
growth,
dispersal
and year-round
value.
- Purpose
Shape
responsible,
year round
visitor
experiences.
- Early Priorities
Develop
themed
clusters;
improve
information and
wayfinding;
encourage
longer stays.
- Outcome by
2036
Longer stays,
wider dispersal
and deeper
visitor
engagement.
Environment &
Infrastructure
- Strategic
investment that
enables
connectivity
and protects
place and
the planet.
- Purpose
Protect place
while
enabling
responsible
access.
- Early Priorities
Improve core
infrastructure;
visitor
management;
climate-aware
investment.
- Outcome by
2036
Healthy
environments,
reduced
pressure points
and long-term
resilience.
The Moray Pillars for Action reflect local lived
experience while aligning with the national shift
toward value-led, place-based and wellbeing-
focused tourism
set out in Scotland Outlook 2030
and related strategies.
16 | Moray Tourism
2036 | The 10 Year Strategy
Moray Tourism
2036
Refer to Moray Tourism
2036 - The Ten Year Strategy Explained
Moray Tourism
2036 | The 10 Year Strategy | 17
Page 231

Page 232

OUR PRIORITY 
MARKETS
OUR PRIORITY MARKETS
PRIORITY SEGMENTS
Four priority segments reflect the duality of Moray’s current visitor profile, local aspirations
and national opportunity.
PRIORITY SEGMENTS
SEGMENTS
W
HO
THEY ARE
Slow
Adventurers &
Nature Seekers
Domestic and short-haul visitors who choose
low-impact, slower-paced travel drawn by
wildlife, coast, rivers, dark skies and outdoors
Encourages shoulder-season travel, dispersed
exploration and stewardship-led experiences
Families & 
Multi-Generational
Families, often visiting friends and relatives
(VFR) and repeat trips seeking safe, accessible
places and shared experiences in towns,
villages and along the coast
Supports year-round value in local services
and facilities, especially in towns and smaller
communities
Premium
International 
& Specialist Interests
High-value, low volume travellers (notably 
North America/Europe) seeking bespoke whisky, 
golf, fishing and country sport experiences
Focuses on premium
curated itineraries
featuring local produce and experiences with
local small-scale operators
Culture & Heritage
Explorers
Visitors motivated by history, archaeology,
arts & festivals
Drives longer dwell time and deeper
engagement with Moray’s heritage, culture and
creative economy
W
HY IT MATTERS FOR MORAY/
OPPORTUNITIES FOR MORAY
18 | Moray Tourism
2036 | The 10 Year Strategy
Refer to Moray Tourism
2036 - The Ten Year Strategy Explained
Moray Tourism
2036 | The 10 Year Strategy | 19
Available data suggests Moray’s visitor economy is
shaped by:
•
Strong domestic demand
•
High repeat visitation
•
Deep emotional attachment to place
However, lived experience confirms that Moray 
also enjoys a significant premium
international
market linked to whisky, golf, country sports and
specialist retail.
These combine as a dual market profile creating
valuable opportunities to focus less on volume and
more on value, quality and year-round local benefit.
MORAY’S DUAL MARKET
Domestic, repeat,
experience-seeking visitors
Families, couples and individuals plus
people visiting friends and relatives
who value the great outdoors, heritage,
authenticity and calm. 
Opportunity: longer stays and 
deeper engagement.
High-spend, low-volume visitors
linked to whisky, golf, heritage and
curated experiences. 
Opportunity: premium
itineraries and
stronger local supply chains.
Premium, international
and specialist interests
Core Market
Core Market
OTHER IMPORTANT SEGMENTS
Touring Visitors
Often pass through on wider
Scottish itineraries. 
Opportunity: convert pass-through
to overnight stays.
Business &
Extended Stays
Temporary workers and events &
training visitors extending their stays. 
Opportunity: enhanced 
mid-week stays, leisure and 
town-based spend.
Page 232

Page 233

MORAY’S 
EXPERIENCE 
CLUSTERS
HOW
OUR VISITORS 
EXPERIENCE MORAY
Moray’s diverse offer can be organised into
five interconnected “experience clusters”.
These are not campaigns but structural
foundations that reflect the region’s
identity pillars and relevance to the priority
segments. These provide the basis for product
development and infrastructure investment.
Each cluster is designed to:
Drive shoulder season
growth
Connect communities,
businesses and assets
Strengthen and join up what
Moray already does well
Fill gaps evident from
engagement
Spark entrepreneurial
ideas
Support micro-businesses
and community groups
Align with the new
narrative for Moray
20 | Moray Tourism
2036 | The 10 Year Strategy
EXPERIENCE
CLUSTER
W
HY IT 
MATTERS
PRIORITIES
COASTS, HARBOURS
AND MARINE LIFE
The coast is Moray’s most distinctive 
asset but remains underpromoted
and underinterpreted
1. Moray Coastal Trail Enhancement
2. Coastal Wellbeing and Watersports
3. Harbours as Story Hubs
4. Marine Wildlife Experiences
5. Coastal Accessibility
Whisky is the global anchor but its
connection to place, people, food and
heritage in Moray is underdeveloped
1. Whisky Villages Experience
2. Taste of Moray Trail
3. Maker & Craft Routes
4
Premium
Story-Rich Offer
5. Community Connections
Moray’s historical and cultural depth is
exceptional but poorly connected
across the destination and modestly
promoted
1. Moray Stories Network
2. Heritage Trail Network
3. Creative Moray Programme
4. Cultural Events Calendar
5. Interpretation Upgrades
NATURE, OUTDOORS &
W
ELLBEING
Moray’s resources for outdoor
activities on land and water are
significant but underdeveloped,
underpromoted and underconnected.
Golf and Country Sports are at a
premium
level but offered in isolation
to the wider Moray offer
1. Dark Skies & Northern Lights
2. Trail Experiences
3. Wellbeing Moray
4. Moray ‘More Than’ Golf  & Country 
Sport Days
5. Wildlife & Conservation
6. Accessible Infrastructure
TOW
NS, VILLAGES &
COMMUNITIES
Strong identities and considerable
volunteer effort, but towns and
villages feel ‘invisible’.  Communities
want visibility, pride and revitalisation
1. Town Story Maps
2. Community Experience Programme
3. Town Centre Regeneration Alignment
4. Local Walks and Trails
5. Visitor Services Support
OUR EXPERIENCE CLUSTERS EXPLAINED
W
HISKY, FOOD, DRINK AND
CRAFTMANSHIP
HERITAGE CULTURE &
CREATIVITY
Moray Tourism
2036 | The 10 Year Strategy | 21
Page 233

Page 234

COLLABORATIVE 
MARKETING
AND
PRODUCT DEVELOPMENT
GUIDANCE 
FOR DELIVERY
How
We Promote and Package Moray
PRIORITY THEMES
Moray already demonstrates strong collaboration
through its signature events, festivals and place-
based initiatives. These activities provide a solid
foundation for developing more joined-up products,
shared storytelling and coordinated promotion that
can strengthen Moray’s offer, extend the season and
support wider dispersal.
The following collaborative themes are not new
attractions, but ways of connecting existing
strengths, enabling communities, businesses and
partners to work together around shared narratives
and experiences, and collaborative product
development.
HOW
W
E MAKE THIS HAPPEN
In the absence of a destination organisation,
Guidance for Delivery is provided to support the
initial steps and set out a road map that can evolve
as momentum
builds.
Delivery of Moray Tourism
2036 will be phased,
partnership-led and responsive to Moray’s capacity
and context. Actions will build on existing strengths,
collaborations and initiatives, supported by
Guidance for Delivery that sets out priorities, roles
and sequencing in more detail. This approach
ensures the Strategy is current, practical and
adaptable whilst focusing on long-term
impact.
A LEADERSHIP STRUCTURE
Given the current void in leadership, a phased
approach to establishing a new
and agile destination
leadership and collaboration structure is set out.
The first priority is inviting interest in creating a lean
and agile tourism
leadership group(TLG) comprising
a small cohort of local industry leaders who
represent the breadth of the offer and geography.
This TLG will provide the voice of the industry and
lead the scoping and transition to a robust and
sustainable destination leadership structure for
Moray which will provide an authoritative and
cohesive industry overview
as this strategy is
implemented in full.
In parallel a Moray Strategic Tourism
Partnership
(STP) is proposed bringing the TLG together with key
agency and support players, notably but not
restricted to the council, VisitScotland, Highlands
and Islands Enterprise, CNPA, FSB, Business
Gateway, DYW
and the Moray Chamber of
Commerce. This partnership will champion Moray
Tourism
2036 and growth of the visitor economy. In
the early stages the STP is where strategic priorities
will be agreed, support mechanisms developed, and
new
opportunities harnessed. 
Its inter-relationship with and involvement in
the new
destination leadership structure will be
reviewed over time.
A forum
structure is then recommended to ensure
geographic and themed interests have robust
mechanisms to engage in tourism
policy, activity
and decision making.
A BLENDED FUNDING
MODEL
Scotland’s destination organisations are funded
through many different mechanisms. In Moray a
blended model is recommended drawing funds from
a range of sources and evolving over time, ensuring
businesses, agencies and communities can readily
engage and have a voice. This blended model
acknowledges the limitations the previous BID and
any membership model provides where it focuses on
the interests of members rather than the destination
as an entity.
Moray Council has begun the pre-consultation stage
on a potential Visitor Levy. This is an initial stage
only, and no decisions have been taken; the levy
may or may not progress. This Strategy neither
assumes nor proposes a Visitor Levy. If a levy were
ever to be introduced, it could form
one of several
potential funding sources to help support the long-
term
delivery of elements of this Strategy.
MORAY TOURISM
LEADERSHIP GROUP
Tourism
Industry
Leadership Group
Transitions To Become
New
DMMO
MORAY STRATEGIC
TOURISM
PARTNERSHIP
TLG/DMMO
Agency Partners (MC, 
VS, HIE, CNPA)
Industry (MCC)
Support Partners 
(FSB, BG, DYW
)
MORAY 
TOURISM
FORUMS
Themed - Heritage, Food &
Drink, Outdoor Activities,
Events and Festivals
Place Based - Moray
Communities
SPIRIT OF
SPEYSIDE – 
FROM
FESTIVAL
TO
CONNECTED 
W
HISKY 
EXPERIENCES
Building on the
festival’s success
to link distilleries
with food,
accommodation,
heritage and 
communities,
encouraging longer
stays and deeper
exploration across
Moray.
ARTS & 
CULTURE –
CONNECTING
CREATIVE
MORAY
Bringing together
festivals, makers,
venues and 
contemporary
culture through
shared storytelling
and seasonal
programming to
strengthen visibility
and local creative
economies.
MORAY W
ALKING 
& OUTDOOR
FESTIVAL –
SHARED 
EXPERIENCES,
YEAR-ROUND
VALUE
Expanding
collaborative
walking, outdoor
and wellbeing
experiences that
support slower
travel, wider
dispersal and off-
peak visitation.
TOURS & TRAILS
– JOINED-UP
JOURNEYS 
ACROSS MORAY
Connecting coast,
heritage, food and
drink, nature and
communities into
trails presenting
coherent themed
journeys that make
Moray easier to
explore and give
reasons to stay
longer.
GOLF –
CONNECTING
BEYOND
THE
COURSE
Extending golf
visits by linking
courses and the
timing of the golf
experience with
local food, culture,
landscape and
other outdoor
experiences 
to deliver higher
value and broader
local benefit.
22 | Moray Tourism
2036 | The 10 Year Strategy
Refer to Moray Tourism
2036 - Guidance for Delivery
Moray Tourism
2036 | The 10 Year Strategy | 23
Page 234

Page 235

Our Vision: By 2036, Moray will be recognised
as a leading example of place-based, community
powered, responsible tourism. A place where
outstanding global brands and local enterprise
thrive together and tourism
enriches local
life, strengthens communities, enhances and
celebrates nature and culture, and offers visitors
meaningful experiences across all seasons.
OUR STRATEGIC
FRAMEWORK
2026-36
OUR GUIDING
PRINCIPLES
A JOINED-UP
PLACE LED
PROPOSITION
A RENEW
ED
PLACE
NARRATIVE
A CONFIDENT
FOUNDATION
FOR ENTERPRISE
AND PROSPERITY
A W
ELLBEING
ECONOMY 
LENS
COMMUNITIES
AS PARTNERS
NOT
SPECTATORS
STEWARDSHIP
FIRST
Connecting
Moray’s hidden
assets with its
global brands/
linking place
and people as
one coherent
destination
Principles What matters Our approach
A collegiate, agile
and transparent
destination
management
model that
represents
businesses,
communities,
global brands and
volunteer groups
Rooted in Moray’s
landscape,
people, culture,
creativity and
contrasts
A strong, place-
rooted cohesive
story guides how
Moray presents
itself and how
businesses and
communities
collaborate
translating
into authentic
memorable
experiences
Creating an
environment
for enterprise to
invest and grow
with clarity and
confidence
Tourism
empowers
businesses and
communities
to invest with
confidence,
supporting fair
work, skills
and resilient
workforce
Tourism
as a
driver of local
pride, resilience,
and fair work
balancing people,
places and profit
Tourism
growth
should be
supported by
the essential
infrastructure
that serves both
residents and
visitors
Recognising local
organisations,
charities, social
enterprises
and volunteers
as essential
contributors
Visitors feel
connected
through
authentic,
place-based
experiences
developed
collaboratively
and delivered
by proud local
people
Tourism
that
strengthens
everyday life,
protects Moray’s
landscapes and
delivers long-
term
value for
communities,
businesses and
visitors
Growth is paced
to local capacity,
with investment
in infrastructure,
environment
and visitor
management
coming before
promotion
OUR 
DELIVERY FRAMEW
ORKS
DESTINATION
LEADERSHIP IN
MORAY 
5 Delivery
Charters
DESTINATION
COLLABORATION
& EARLY ACTIONS
IN MORAY
MORAY’S
IDENTITY
BRAND AND
PROMOTION
ENTERPRISE AND
INVESTMENT IN
MORAY
COMMUNITY
BENEFIT AND
RESILIENCE
ACROSS MORAY
MORAY’S
PRODUCT AND
EXPERIENCE
CLUSTERS
INFRASTRUCTURE
INVESTMENT IN
MORAY
CLIMATE, NATURE
STEWARDSHIP 
IN MORAY
What we will doOUR PILLARS FOR ACTION
Destination
Leadership &
Coordination
A light-touch,
inclusive, enabling
model that
reconnects and
drives Moray
Identity, Brand &
Promotion
A compelling
narrative that ties
Moray’s places
and assets
together to inspire
responsible visits
that resonate &
connect
Enterprise &
Investment
An inspirational
framework to
support Moray’s
enterprises,
people and places
to grow with
confidence and
purpose
Community
Benefit &
Resilience
Meaningful
connections
between visitors,
communities
& enterprise
empowering
Moray’s people &
places to flourish
Visitors
Experience &
Dispersal
Shaping Moray’s
visitor offer
to support
responsible
growth, dispersal
and year-round
value
Environment &
Infrastructure
Strategic
investment
that enables
connectivity and
protects place 
and the planet
Our priorities
24 | Moray Tourism
2036 | The 10 Year Strategy
OUR STRATEGIC
FRAMEW
ORK 2026-36
HOW
W
E ORGANISE DELIVERY
Eight delivery frameworks are provided to guide the
implementation of this strategy and ensure a clear
and robust road map is in place which can be
amended and will evolve as time progresses.
At its core Moray Tourism
2036 provides a strategic
framework for
• 
A two-year transition towards new
destination 
leadership and governance Co-designing an 
inclusive leadership model with strategic 
partners.
•
An immediate focus on collaborative marketing 
and product development 
Encouraging greater collaboration around Moray’s 
current strengths to elevate the offer and energise
the players.
• 
A living, agile strategy
Designed to adapt, responsive to the priorities of 
Moray and its businesses and communities 
over time.
Moray Tourism
2036 | The 10 Year Strategy | 25
Page 235

Page 236

1. Destination leadership in Moray
Leadership,
Partnerships &
Governance
Creating a connected,
confident and
collaborative model
for destination
development,
management and
promotion
Phased
implementation
A phased approach
that builds 
confidence, capacity
and momentum
Measurement
Tracking what
matters —
and
demonstrating value
to communities
Resourcing
A fair, transparent 
and sustainable
funding approach
Monitoring Review
and Refresh Cycles
A living strategy
guided by real data
and real voices.
2. Destination collaboration and early
actions in Moray
To build momentum, confidence and connection
across Moray’s visitor economy by enabling
practical, inclusive and place-based collaboration
from
the outset of the strategy.
3. Moray’s identity, brand & promotion
To create a clear, confident and authentic identity
for Moray that reflects its people, places and stories
while ensuring the region is visible and discoverable
to audiences aligned with its values.
4. Enterprise & investment in Moray
To strengthen Moray’s visitor economy as a driver of
inclusive, place-based economic growth by
supporting enterprises to adapt, collaborate and
invest with confidence.
5. Community benefit & resilience 
across Moray
To ensure tourism
strengthens local life across
Moray by supporting community-led priorities,
sustaining volunteer endeavour, enabling fair work,
and reinvesting in the places, services and people
that make Moray distinctive.
6. Moray’s product & experience clusters
A joined-up approach to strengthening, connecting
and elevating Moray’s offer.
7. Infrastructure & investment  
across Moray
To build the foundational infrastructure required
for Moray to function confidently as a community
powered, responsible destination.
8. Climate nature & stewardship 
across Moray
To protect what makes Moray special; safeguarding
landscapes, coastlines, habitats and heritage
responding to climate impacts while enabling
responsible, low-impact visitor experiences.
OUR PHASED 
DELIVERY PLAN
OUR EIGHT DELIVERY
FRAMEWORKS
Initial Steps (First 6–9 months)
Three simple steps will kickstart the delivery of this
strategy:
1. Establish the tourism
leadership group and   
strategic tourism
partnership.
2.  Assume management of the existing website and 
digital channels and develop a digital
marketing plan & events calendar.
3.  Appoint a contractor/freelance team
providing
• 
a coordinator to support the TLG in its 
deliberations and actions, engage the industry 
and provide basic admin support.
• 
a digital marketeer to develop and manage the 
digital assets and digital content.
• 
a destination development manager to 
progress the collaborative initiatives and 
product development.
Phase 1 (2026–2028) —
Stabilisation
Focus: coordination, infrastructure, narrative, 
early wins.
• 
New
destination leadership model scoped out
• 
Place branding and narrative for Moray developed
• 
Collaborative initiatives delivered
• 
Bookable experience clusters developed
• 
Annual tourism
conference
• 
First Tourism
Dashboard published
• 
Visible infrastructure improvements
Phase 2 (2028–2031) —
Integration & Growth
Focus: product development, experience depth,
collaboration.
• 
Destination leadership structure resourced 
and launched
• 
Full trails development, wayfinding & 
signage rollout
• 
Bookable experience clusters expanded.
• 
Major cultural & heritage interpretation upgrades
Phase 3 (2031–2036) —
Maturity & Leadership
Focus: national leadership, premium
experiences,
regenerative tourism.
• 
Midpoint review
of Moray Tourism
2036
• 
Premium
story-rich experiences
• 
Integrated transport & visitor management
• 
Permanent destination body
• 
Effective measurement and storytelling of   
tourism
impacts and benefits
26 | Moray Tourism
2036 | The 10 Year Strategy
Refer to Moray Tourism
2036 - Guidance for Delivery
Moray Tourism
2036 | The 10 Year Strategy | 27
Page 236

Page 237

MEASURING
OUR SUCCESS
W
HAT SUCCESS LOOKS LIKE 
IN
2036
By 2036, success for Moray’s visitor economy is
defined by confidence, connection and shared
benefit rather than scale or volume. Moray is
recognised as a coherent, place-led destination,
connected through a clear and authentic shared
narrative.
A lean, inclusive and trusted coordination
model enables collaboration across businesses,
communities and partners, supporting confident
enterprise, stronger local supply chains and clearer
pathways to support. Communities experience
visible social, cultural and economic benefit from
tourism, with volunteer effort and community
leadership recognised, supported and sustained.
Investment in infrastructure, visitor management
and digital visibility has improved everyday
experience for residents and visitors, reducing
pressure points and strengthening year-round
value. Visitors are encouraged to stay longer,
explore more widely and engage more deeply, while
tourism
contributes meaningfully to fair work, skills
development and youth opportunity.
Growth is measured, responsible and climate-
aware, supporting nature recovery, place
stewardship and long-term
resilience. And Moray
has a confident voice within Scotland’s tourism
landscape as a practical example of community-
powered, place-based tourism
that works for
people, place and prosperity.
A bespoke Moray Tourism
Dashboard is
recommended, designed to support transparency.
Key considerations will be gauging sentiment and
demonstrating progress in:
Environment and
Stewardship
Business 
resilience
Visitor experience 
and satisfaction
Community 
benefit
Collaboration and
coordination
“BY 2036, SUCCESS
FOR MORAY’S VISITOR
ECONOMY IS DEFINED
BY CONFIDENCE,
CONNECTION
AND
SHARED BENEFIT
RATHER THAN
SCALE
OR VOLUME.”
KEY PERFORMANCE INDICATORS
Visitor Experience
& Satisfaction
Visitor satisfaction
digital engagement
itinerary usage
repeat visitation
shoulder season
occupancy
Business 
Health
Business barometer
revenue stability
across seasons
workforce retention
and living wage
employers local
supply chain usage
number of bookable
experiences
Community 
Benefit
Number of
community projects
funded volunteer
hours supported
improvements to
toilets, signage,
trails community
satisfaction metrics
youth participation
numbers
Environment &
Stewardship
Ranger reports
waste reduction
EV charging use
active travel metrics
biodiversity
engagement
initiatives
Collaboration &
Coordination
TLG
meeting
frequency
forum
participation
annual conference
engagement
cross-sector
collaboration
outcomes
response times for
issues raised
28 | Moray Tourism
2036 | The 10 Year Strategy
Moray Tourism
2036 | The 10 Year Strategy | 29
Page 237

Page 238

MORAY 
SPEAKING 
FOR ITSELF
“MORAY ISN’T LOUD – IT
WHISPERS. BUT IF YOU
LISTEN
CLOSELY, IT TELLS
THE KIND OF STORY THAT
STAYS WITH YOU...”
For many years,
Moray has been
overshadowed by its
neighbours. Moray
Tourism
2036 does not
seek to compete, but
to offer a distinctive
alternative—
one rooted
in Moray’s people,
places and values, and
confident enough
to stand alongside
neighbouring
destinations as a
complementary and
collaborative partner.
Through renewed leadership, stronger collaboration
and a phased approach to delivery, Moray can
steadily amplify its own voice while working
constructively with neighbours to strengthen
regional journeys, shared itineraries and mutual
benefit. In doing so, Moray becomes easier to
discover, easier to understand and easier to value—
on its own terms.
This strategy is not about making Moray something it
is not. It is about revealing what Moray already is:
quietly exceptional, quietly creative and quietly
welcoming. It provides the framework for Moray to
be heard and to be visited by people who value what
is on offer, engage with care and curiosity, and
contribute positively to the places and communities
they encounter.
In doing so, Moray Tourism
2036 ensures tourism
delivers benefits that matter to local people,
supporting communities, strengthening enterprise
and protecting the places that make Moray special,
now
and into the future.
30 | Moray Tourism
2036 | The 10 Year Strategy
Moray Tourism
2036 | The 10 Year Strategy | 31
Page 238

Page 239

The development of this Tourism Strategy has been supported by funding from the UK
Government through the UK Shared Prosperity Fund (for more information visit UK Shared
Prosperity Fund), Visit Moray & Speyside Ltd and Highlands and Islands Enterprise
This strategy has been developed and produced by SCOTO CIC based on SCOTO’s PressPause ® methodology. 
Our thanks to all who engaged in the process and freely shared their passion and insights ensuring this strategy directly
responds to their local lived experience and ambition.
Connected. Supported. Promoted
Moray Tourism 2036
Page 239

Page 240

Page 240

Page 241

Report to: Economic Development and
Infrastructure Services
Committee 
Meeting Date: 10 March 2026  
Report by: Executive Director Economy, Enterprise and Operations 
Author: Louise Ross  Contact Email: louise.ross@moray.gov.uk 
Subject: Development of the Moray Film Liaison Service 
1.  PURPOSE 
☐ For Decision      ☒  For Information 
1.1  The purpose of this report is to inform Committee of the ongoing development of the
Moray Film Liaison Service.  It also outlines potential opportunities for future service
enhancement and income generation using Council-managed assets.  
1.2  This report is submitted to Committee in terms of Section III (F) (34) of the Council’s
Scheme of Administration relating to providing, developing and monitoring the Council’s
Economic Development and Infrastructure Services. 
2.  SUMMARY  
2.1  Moray continues to attract growing interest from film and television productions, and the
Council currently operates a dedicated but reactive Film Liaison Service within the
Economy and Enterprise team.  
2.2 To strengthen Moray’s offer, work has been undertaken to implement a structured enquiry
process, provide clear information on the website, and establish guidance to improve
coordination of internal procedures.  The Moray Film Liaison section of the Moray Council
website has also been updated. 
3.  BACKGROUND AND CONTEXT  
3.1 Moray Council is part of the Scottish Locations Network (SLN).  The network is a
collaborative effort made up of Scotland's film commissions and council-based film
liaison officers, with Creative Scotland's Locations Department acting as a central hub.
Filming enquiries come to the Moray Film Liaison Service via SLN, Creative Scotland or as
a direct enquiry from the production company.  
Page 241

Page 242

3.2 In 2024/25, the Moray Film Liaison Service responded to 27 filming-related enquiries,
which included national and international film and television programmes, commercial
and promotional shoots, and independent and student film projects.  Recent filming
activity in areas such as Forres, Buckie, Cullen and Burghead presented a major
opportunity for Moray, bringing significant economic benefits through increased footfall,
local spending and use of local services, accommodation, and facilities.  Further
information will be gathered to quantify the spend generated by this production.    
3.3 Filming activity occurred across several Council-managed and private locations and some
required coordination with multiple Council services, including Open Spaces,
Transportation, Harbours and Property, Estates and Assets. 
3.4 Although not all enquiries result in filming activity, the volume and variety of requests
demonstrate Moray’s increasing visibility and appeal as a filming destination. Recent high-
profile productions are expected to drive a further increase in enquiries, reinforcing the
need for a more proactive and coordinated service that can effectively manage demand,
provide consistency across Council services, and optimise the economic and promotional
opportunities filming can bring to the region. 
4.  PROPOSALS  
4.1 A Filming Enquiry Form has been introduced to standardise the information collected from
production companies, including details such as locations, crew sizes, dates, and
potential impacts, including an estimation of spend in the local economy. This will support
consistent handling of enquiries, streamline internal communications, and enable timely,
coordinated responses across relevant Council services.  It will also provide an early
indication of anticipated local economic benefit.  
4.2 Guidance notes on the role and the enquiry process have been developed to support
officers across the Council.  These documents are for officer use only.  All filming
enquiries are considered on a case-by-case basis to ensure tailored support and advice. 
Developing more formal guidance could be perceived as creating unintended barriers for
those approaching the Council.  Further information for filming companies is available on
the Moray Film Liaison section of the Moray Council website.  
4.3 Moray Council does not charge for officer time dedicated to managing filming enquiries.
This is consistent with the approach adopted by other councils aiming to stay competitive
and foster a supportive environment for the screen industry.  The screen industry brings
direct economic benefits to local communities through spending on accommodation,
catering, transport, and other services. It also supports longer-term growth by increasing
the area’s visibility, attracting tourism, and creating employment opportunities.  
4.4 However, as part of the potential future service enhancements, opportunities for income
generation using Council-managed assets, such as harbours, roads, and land, could be
identified and promoted while continuing to deliver a service that is supportive of the
industry and competitive in line with national practice.  Some assets have a process which
enables charging in place already such as Open Spaces and Harbours, but for some this
would require development. Officers from the Economy, and Enterprise team will liaise
with other Council services to identify suitable Council assets to promote, with support
from the Communications team and guidance from Creative Scotland to maximise filming
Page 242

Page 243

opportunities.  At a corporate level, consideration will also be given as to whether certain
aspects of the service would be more effectively managed within a broader
Communications function as part of a corporate marketing approach.  
4.5 Recent media reports on the economic impact of filming in the area were assessed using
different methodologies across local authorities.  Aberdeenshire and Highland Councils
applied a formula recommended by Screen Scotland, while Aberdeen City, in line with our
approach, reported only income generated from filming on council-owned land,
representing Council income only.  A consistent methodology will now be adopted using
the Screen Scotland formula, which will capture the wider economic benefit to the area,
rather than being limited to Council generated income.  It should also be noted that the
figures previously reported did not include income associated with high-profile filming
activity that took place in 2025.  
5.  SUMMARY OF IMPLICATIONS  
5.1 The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) X 
Policy and Legal X 
Financial  X
Risk X 
Staffing  X
Best Value and Transformation X 
Property X 
Information Communications Technology/Digital  X
Equalities. Social Inclusion and Economic Impact              X 
Climate Change and Biodiversity Impact             X 
5.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population
Page 243

Page 244

5.3 Policy and Legal 
The Council considers support for economic development issues on their merits, against
the objective to facilitate sustainable economic growth and the desired outcomes of the
10 Year Plan and Corporate Plan.  
5.4 Financial 
None arising from this report. 
5.5 Risk 
Both Aberdeenshire and Highland Councils have dedicated film liaison officers, resources
and well-developed websites, highlighting the importance and necessity of ensuring
Moray remains competitive as a viable and attractive filming location by making best use
of the limited resources it has.  Ensuring there is effective and coordinated data gathering
in place, keeping the council website up to date and undertaking opportunities for
proactive promotional work as resources allow, will minimise the risk of losing out on
filming opportunities to neighbouring areas.  
5.6 Staffing 
Development of the Moray Film Liaison Service will be accommodated within existing
staffing resources in the Economy and Enterprise team with assistance from other
services if needed e.g. Open Spaces, Property, Estates and Assets etc.  
5.7 Best Value and Transformation 
Supports Best Value through improved efficiency and coordination. Contributes to
transformation by modernising delivery and identifying income opportunities.  
5.8 Property 
No specific properties are related to this report.  However, liaison with Property, Estates
and Assets will be required to identify any assets suitable for promotion.  
5.9 Information Communications/Technology/Digital 
None arising from this report.  
5.10 Equalities, Social Inclusion and Economic Impact 
Filming in Moray supports economic development by attracting external investment and
raising Moray’s profile as a filming location.  Filming has a positive impact on local
accommodation, restaurants, and other businesses through increased visitor spending
and demand for services.  
5.11 Climate Change and Biodiversity Impacts 
The potential increase in film productions to Moray could result in an impact due to
productions causing carbon emissions through transport, accommodation etc. The
promotion of sustainable tourism in addition to supporting tourism businesses to reduce
their carbon footprint will assist in preventing some of the impacts of tourism on the
climate. 
Page 244

Page 245

6.  CONSULTATION  
6.1 This report has been prepared in consultation with Executive Director Economy, Enterprise
and Operations, Head of Growth, Planning and Climate (Chief Planning Officer), Service
Manager Legal Services, Head of Operations and Environment, Head of Housing, Property
and Communities, Chief Financial Officer and Lissa Rowan, Committee Services Officer
and any comments made have been incorporated into the report  
7. BACKGROUND PAPERS  
7.1 Use of Council Buildings and Structures for Abseiling etc. 5 September 2023   
Page 245

Page 246

Page 246

Page 247

Report to: Economic Development
and Infrastructure
Services Committee 
Meeting
Date:
10 March 2026  
Report by: Executive Director for Education, Housing & Communities      
Author: Danny Henderson,
Asset Manager
(Commercial
Properties) 
Contact
Email:
danny.henderson@moray.gov.uk 
Subject: List of Property Transactions Concluded Under Delegated Powers 
1. PURPOSE 
☐ For Decision      ☒  For Information 
1.1 This report is submitted to the Economic Development and Infrastructure
Services Committee in terms of Section III F (5) of the Council’s Scheme of
Administration relating to industrial and commercial development. 
2. SUMMARY  
2.1 The purpose of this report is to inform the Committee of property transactions
which have been dealt with under delegated powers. 
3. BACKGROUND AND CONTEXT  
3.1 In terms of the Council’s Scheme of Delegation, the Head of Housing, Property
and Communities has delegated authority to grant assignations of existing
leases where the terms of lease remain substantially unaltered and to
authorise sub-lets.  
3.2 In terms of the Council’s Scheme of Delegation, the Head of Housing, Property
and Communities has delegated authority to conduct rent reviews and fix new
rents.  
Page 247

Page 248

3.3 In terms of the Council’s Scheme of Delegation, the Head of Housing, Property
and Communities has delegated authority to grant leases, licenses or other
occupation agreements of land and buildings for 25 years or less duration
where the initial rent does not exceed £35,000 per annum and sites on long
term building leases of up to 125 years duration where the initial rent does not
exceed £35,000 per annum.  
3.4 In terms of the Council’s Scheme of Delegation, the Head of Housing, Property
and Communities has delegated authority to grant wayleaves or servitudes
over Council owned property. 
4. PROPOSALS  
4.1 APPENDIX 1 – assignations  
4.2 APPENDIX II – rent reviews  
4.3 APPENDIX III – leases  
4.4 APPENDIX IV – servitudes/wayleaves 
5. SUMMARY OF IMPLICATIONS  
5.1 The table below shows whether risks and implications apply if the
recommendations are agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) ✓ 
Policy and Legal  ✓
Financial ✓ 
Risk  ✓
Staffing  ✓
Best Value and Transformation  ✓
Property  ✓
Information Communications Technology/Digital  ✓
Equalities. Social Inclusion and Economic Impact   ✓
Climate Change, Biodiversity and Sustainability  ✓ 
5.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP))
Improved Collaborative Leadership, as part of continuous improvement
through Best Value, will better enable the Council to fulfil the ambitions set
out in its strategic plans.
Page 248

Page 249

a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the
following Council Plan strategic priorities:
☐ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report
support and contribute to improved outcomes for communities as
outlined in the following local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in
Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population   
5.3 Policy and Legal 
None.  
5.4 Financial 
The transactions detailed in APPENDICES II, III and IV will generate an
income to the Council. 
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend this
Year
Virement
From
Other
Comments       
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments       
5.5 Risk 
None.  
5.6 Staffing 
None.  
5.7 Best Value and Transformation 
None.  
5.8 Property
Page 249

Page 250

None.  
5.9 Information Communications/Technology/Digital 
None.  
5.10 Equalities, Social Inclusion and Economic Impact 
None.  
5.11 Climate Change and Biodiversity Impacts 
None. 
6. CONSULTATION  
6.1 None. 
7. BACKGROUND PAPERS  
7.1 None.   
Page 250

Page 251

APPENDIX I 
REPORT TO THE ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES COMMITTEE ON 10 MARCH 2026 
LIST OF ASSIGNATIONS OF SITES/UNITS - SUBMITTED FOR NOTING 
1. Ref No
2. Valuer’s Ints
1. Assignor
2. Assignee
Address Lease Details Remarks
1. BD/750/18 
2. AGREIG
1. Plumbing and Renewables Ltd 
2. Mark Galbraith
Site 17 Burghead Harbour
Church Street
Burghead
Lease Commenced
1/4/11
Lease Term
1(Y), 0(M), 0(D)
Rental
£570 p.a. 
Permitted Use:
Builder’s store.
Page 251

Page 252

APPENDIX II
REPORT TO THE ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES COMMITTEE ON 10 MARCH 2026 
LIST OF RENT REVIEWS OF BUILDINGS AND SITES - SUBMITTED FOR NOTING 
1. Ref No.
2. Valuer’s Ints.
1. Address
2. Tenant
1. Building (m²) 
2. Site (Ha)
1. Date of Entry
2. Review Period
Interval
1. Previous Rent
2. New Rent
Remarks
1. MO/1/103 
2. AGREIG
1. 9 Mosstodloch Industrial
Estate, Mosstodloch 
2. Taylor Engineering
1. - 
2. 0.17Ha
1. 11/3/19 
2. 3 years
1. £6,350 p.a. 
2. £7,200 p.a.
Permitted Use:
Storage of materials in
relation to engineering
business.
1. FR/2/101 
2. AGREIG
1. Site Adjacent to 6 Greshop
Road, Forres 
2. Alan Bartlett & Sons (Chatteris)
Ltd
1. - 
2. 0.30 Ha
1. 15/5/95 
2. 5 years
1. £10,400 p.a. 
2. £12,500 p.a.
Permitted Use:
Uses within Classes 4 &
5 within the 1989 Use
Classes Order.
1. BK/1/211 
2. AGREIG
1. 7 & 8 March Road East, Buckie 
2. Simpson’s Ices Ltd
1. 186.8sqm 
2. 0.05Ha
1. 16/9/16 
2. 3 years
1. £14,500 p.a. 
2. £15,150 p.a.
Permitted Use:
Ice Cream manufacture
and storage of supplies.
1. LO/2/100 
2. SOAND
1. Workshop, Shore Street,
Lossiemouth 
2. Frank Norrie Ralph
1. 279sqm 
2. 0.14Ha
1. 1/12/93 
2. 5 years
1. £1,065 p.a. 
2. £1,400 p.a.
Permitted Use:
Business of a marine/
general engineering
works.
Page 252

Page 253

1. EL/5/272 
2. SADEWO
1. Unit F Pinefield Business
Centre, Elgin 
2. Mr Jihad Kabbani
1. 59sqm 
2. -
1. 11/7/01 
2. 3 years
1. £5,400 p.a. 
2. £6,400 p.a.
Permitted Use:
Store in connection with
tenant’s confectionery
wholesale business.
1. EL/1/214 
2. SADEWO
1. 6 Chanonry Road North, Elgin 
2. Transportation Unit
1. 110sqm 
2. 0.09Ha
1. 16/8/10 
2. 3 years
1. £14,400 p.a. 
2. £15,600 p.a.
Permitted Use:
Equipment store and bus
depot yard.
1. EL/5/263 
2. SADEWO
1. 6 Pinefield Parade, Elgin 
2. APF Heating and Mechanical
Services Ltd (SC406670)
1. 59.85sqm 
2. 0.03Ha
1. 1/7/12 
2. 3 years
1. £4,350 p.a. 
2. £4,650 p.a.
Permitted Use:
Use as workshop/store in
connection with tenant’s
electrical and building
contractor business.
1. HN/750/12 
2. AGREIG
1. Store 20 Hopeman Harbour,
Hopeman 
2. Ms Rebecca Russell
1. 28.6sqm 
2. -
1. 1/7/22 
2. 3 years
1. £1,200 p.a. 
2. £1,400 p.a.
Permitted Use:
Boat gear storage and
ancillary purposes.
1. HN/750/13 
2. AGREIG
1. Site 21 A & B Hopeman
Harbour, Hopeman 
2. Martin South
1. 46sqm 
2. -
1. 1/9/16 
2. 3 years
1. £1,000 p.a. 
2. £1,550 p.a.
Permitted Use:
Private storage.
1. KE/1/222 
2. SADEWO
1. Unit 2, 4 Westerton Road
South, Keith 
2. Miss Lisa Margaret Henderson
1. - 
2. -
1. 10/10/22 
2. 3 years
1. £3,540 p.a. 
2. £3,750 p.a.
Permitted Use:
Florists workshop,
storage and distribution
(direct sales to public
prohibited).
Page 253

Page 254

1. EL/675/30 
2. SADEWO
1. Pre School Centre, 22 Wardend
Place, Elgin 
2. SL Hayward Properties Limited
1. - 
2. 0.12Ha
1. 1/4/05 
2. 5 years
1. £2,450 p.a. 
2. £3,000 p.a.
Permitted Use:
Playschool and nursery.
1. LH/1/201 
2. AGREIG
1. Unit 1 Lhanbryde Industrial
Estate, Lhanbryde 
2. Raymond MacKenzie
1. 47.2sqm 
2. 0.02Ha
1. 1/11/00 
2. 3 years
1. £4,900 p.a. 
2. £5,350 p.a.
Permitted Use:
Upholstery store and
workshop.
1. KE/5/301 
2. SADEWO
1. Yard 1 Newmill Industrial
Estate, Keith 
2. G Cruickshank & Sons Ltd
(209470)
1. - 
2. 0.1Ha
1. 13/5/13 
2. 3 years
1. £3,450 p.a. 
2. £4,050 p.a.
Permitted Use:
Monumental masons
yard. 
Page 254

Page 255

APPENDIX III
REPORT TO THE ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES COMMITTEE ON 10 MARCH 2026 
LIST OF LEASES OF BUILDINGS AND SITES – SUBMITTED FOR NOTING 
1. Reference No. 
2. Officer’s Ints
1. Address 
2. Tenant
1. Building (m²) 
2. Site (Ha) 
1. Date of Entry 
2. Review Period
Rent
(per annum)
Remarks
1. BK/750/79 
2. AGREIG
1. 2 Old Station Yard, Buckie 
2. West Coast Seafoods Ltd
1. 80sqm 
2. 4.27Ha
1. 31/10/25 
2. 3 years
£11,400 Permitted Use:  Boat and
fishing equipment storage.
1. BK/1/224 
2. AGREIG
1. 16-18 March Road East,
Buckie 
2. Addison Tyres and
Garage Services Ltd
1. 210sqm 
2. 0.1Ha
1. 7/11/25 
2. 3 years
£16,700 Permitted Use: 
Automotive repairs.
1. BK/4/101 
2. AGREIG
1. March Road
Development IE, Buckie 
2. Mrs Rachel Eagle
1. N/A 
2. 4.14Ha
1. 27/10/25 
2. None
£200 Permitted Use:  Grazing.
1. BK/1/217 
2. AGREIG
1. 5 March Road East,
Buckie 
2. Steven Hill
1. 112.41sqm 
2. 0.02Ha
1. 8/12/25 
2. 3 years
£9,000 Permitted Use: 
Automotive repair shop. 
Page 255

Page 256

1. EL/1/205 
2. SADEWO
1. 7A Chanonry Spur, Elgin 
2. Moycroft Contracting Ltd
1. - 
2. 0.02Ha
1. 22/4/24 
2. 3 years
£1,120 p.a. Permitted Use:  Site for
storage of machines and
equipment in relation to
tenant business.
1. EL/3/201 
2. SADEWO
1. Unit 1 Linkwood Lane,
Elgin 
2. David Anderson
1. 99.9sqm 
2. 0.02Ha
1. 31/10/25 
2. 3 years
£10,200 p.a. Permitted Use:  Workshop
and store for motor
vehicle repairs and
servicing. 
Page 256

Page 257

APPENDIX IV 
REPORT TO THE ECONOMIC DEVELOPMENT & INFRASTRUCTURE SERVICES COMMITTEE ON 10 MARCH 2026 
GRANT OF SERVITUDES AND WAYLEAVES 
Officer
Intls 
File Ref  Address Description Price  Comments
CQ Telecoms -
Wayleaves
Rear 14 McKenzie Road
Buckie
AB56 1DH
Wayleave (Telecoms) £168 Wayleave to BT Openreach for
single pole installation required
as part of Fibre network upgrades
and to benefit localized
residential service. 
CQ Telecoms -
Wayleaves
Biblical Gardens
King Street
Elgin
IV30 1HU
Wayleave (Telecoms) £0 Wayleave to BT Openreach for
single pole installation required
to facilitate Fibre network
connection at adjacent training
facility (MC tenant). 
CQ Telecoms -
Wayleaves
Rear 68 Nelson Terrace
Keith
AB55 5FD
Wayleave (Telecoms) £686.90 Retrospective wayleave to BT
Openreach for discovered
ducting (Fibre provision) laid to
MC amenity ground. 
Page 257

Page 258

CQ Electricity -
Wayleaves
Land at Former Bilbohall Farm
Edgar Road
Elgin
Wayleave (Electricity) £51.12 Part of SSEN South Elgin Strategy
Project to boost New Elgin supply
capacity.  Section traversing HRA
development site at Bilbohall. 
CQ Electricity -
Wayleaves
The Wards Wetlands Site
Edgar Road
Elgin
Wayleave (Electricity) £110.17 Part of SSEN South Elgin Strategy
Project to boost New Elgin supply
capacity.  Section traversing
Wetlands amenity site at The
Wards. 
CQ Electricity -
Wayleaves
Amenity area adjacent to A96
North of roundabout at High
Street/A941Junction
239 High Street
Elgin 
Wayleave (Electricity) £10.65 Part of SSEN South Elgin Strategy
Project to boost New Elgin supply
capacity.  Section traversing
amenity site at West end of Elgin
High Street, adjacent 239 High
Street. 
CQ Site
Compounds
Stynie Park
Stynie Road
Mosstodloch 
Contractor’s Site Storage
compound License to
Scottish & southern
Electricity Networks (SSEN). 
Site area: 278 m2 
Start Date: 01/12/2025
Expiry: 22/02/2026 
£641.54 Compound in support SSEN’s
works to upgrade electrical
supply cable infrastructure in
Mosstodloch. 
Page 258

Page 259

CQ Site
Compounds
Inveravon Primary School
Ballindalloch
AB37 9BA
Contractor’s Site Storage
compound License to
Ballindalloch Estate (The
Clare Russell No.1
Discretionary Trust). 
Site area: 1,300 m2 
Start Date: 01/12/2025
Expiry: 31/01/2026 
£0 Access and Compound licence in
support of Licensee’s works to
investigate and resolve drainage
issue relating to Council asset at
Former Inveravon PS.
CQ Site
Compounds
Braehead Terrace
Dufftown
AB55 4AN 
Contractor’s Site Storage
compound License to
Aberdeen Marine Ltd. 
Site area: 590 m2 
Start Date: 17/11/2025
Expiry: 19/12/2025 
£0 Compound in support of
contractors works to Council
Housing stock (non-chargeable).
CQ Site
Compounds
Car Park Lossie Green
Boroughbriggs Road
Elgin 
Contractor’s Site Storage
compound License to Taylor
& Fraser. 
Site area: 880 m2 
Start Date: 13/10/2025
Expiry: 16/05/2027 
£0 (Charged
via Roads)
Compound in support of
contractors works as Principal
contractor in Elgin Town Hall
Refurbishment. Charges to be
levied by Roads via car parks
charges.
Page 259

Page 260

CQ Site
Compounds
North Port Flats
Elgin
IV30 1EH 
Contractor’s Site Storage
compound License to David
Williams Slating Limited. 
Site area: 500 m2 
Start Date: 06/10/2025
Expiry: 19/02/2026 
£0 Compound in support of
contractors works to Council
Housing stock (non-chargeable).
CQ Site
Compounds
Site Compound
Former MOD Houses at
Pinegrove
Elgin
IV30 6HP 
Contractor’s Site Storage
compound License to
Sureserve Energy Services
UK Ltd. 
Site area: 350 m2 
Start Date: 15/09/2025
Expiry: 14/07/2026 
£0 Compound in support of
contractors works to Council
Housing stock (non-chargeable). 
Page 260