Economic Development and Infrastructure Services
Committee
Tuesday, 17 June 2025
NOTICE IS HEREBY GIVEN that a Meeting of the Economic Development and
Infrastructure Services Committee is to be held at Council Chambers, Council
Office, High Street, Elgin, IV30 1BX on Tuesday, 17 June 2025 at 09:30.
BUSINESS
1. Sederunt
2. Declaration of Group Decisions and Members Interests *
3. Minutes of meeting of 29 April 2025 7 - 14
4. Written Questions **
5. Performance Report (Environmental and Commercial
Services) - Period to March 2025
Report by Depute Chief Executive (Economy, Environment and
Finance)
15 - 22
6. Performance Report (Economic Growth and
Development) - Period to March 2025
Report by Depute Chief Executive (Economy, Environment and
Finance)
23 - 30
7. Economy, Environment and Finance Service Plans 2025-
28
Report by Depute Chief Executive (Economy, Environment and
Finance)
31 - 60
Page 1

Page 2

8. Buckie Harbour Masterplan
Report by Depute Chief Executive (Economy, Environment and
Finance)
61 - 98
9. Traffic Regulation and Waiting Restrictions Orders to
Support Levelling Up Fund Projects in Elgin
Report by Depute Chief Executive (Economy, Environment and
Finance)
99 -
126
10. National Strategy for 20mph
Report by Depute Chief Executive (Economy, Environment and
Finance)
127 -
138
11. Nature Restoration Fund 2025-26
Report by Depute Chief Executive (Economy, Environment and
Finance)
139 -
146
12. Information Reports - if called in
Information Reports - Not for Discussion at this Meeting
Any member wishing to call in a noting or information report from one
meeting shall give notice to Committee Services at least 48 hours
before the meeting for which the report is published. The Notice shall
be countersigned by one other elected member and shall explain the
reason for call in including any action sought.
Review of Arrangements for Furniture on Footpaths
Report by Depute Chief Executive (Economy, Environment and
Finance)
147 -
150
Moray Pathways Local Employability Partnership Annual
Report
Report by Depute Chief Executive (Economy, Environment and
Finance)
151 -
166
List of Property Transactions Concluded Under
Delegated Powers
Report by Depute Chief Executive (Economy, Environment and
Finance)
167 -
178
Page 2

Page 3

Summary of Economic Development and Infrastructure
Services Committee functions:
Roads Authority; Lighting Authority, Reservoirs Act 1975, Public
Passenger Transport; Flood Prevention; Twinning; Piers and Harbours
and Coast Protection; Industrial and Commercial Development;
Environmental Protection; Burial Grounds; Assistance to Industry or
Commerce; Public Conveniences; Council Transportation; Catering &
Cleaning; Land Reform (Scotland) Act 2003; Countryside Amenities;
Tourism, monitoring funding from European Programmes, youth
training and employment creation scheme and provide Architectural,
Quantity Surveying, Maintenance and Allied Property Services.
Watching the Meeting
You can watch the webcast live by going to: 
http://www.moray.gov.uk/moray_standard/page_43661.html
Webcasts are available to view for 1 year following the meeting.
You can also attend the meeting in person.  If you wish to attend
in person, please come to the High Street entrance door and a
member of staff will let you into the Chamber.
Page 3

Page 4

GUIDANCE NOTES
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how
the individual or members of the group will vote on any item(s) of business on
the Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting.
** Written Questions - Any Member can put one written question about any
relevant and competent business within the specified remits not already on the
agenda, to the Chair provided it is received by the Proper Officer or Committee
Services by 12 noon two working days prior to the day of the meeting.  A copy
of any written answer provided by the Chair will be published on the Council’s
committee management system by 4pm the day before the meeting.  The
Member who has put the question may, after the answer has been published,
ask one supplementary question directly related to the subject matter at the
meeting, but no discussion will be allowed.
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the
consent of the Chair. If a Member does not have the opportunity to put a
supplementary question because no time remains, then he or she can submit it
in writing to the Proper Officer who will arrange for a written answer to be
provided within 7 working days.
Page 4

Page 5

MORAY COUNCIL
Economic Development and Infrastructure Services
Committee
SEDERUNT
Councillor Marc Macrae  (Chair)
Councillor Amber Dunbar  (Depute Chair)
Councillor Tracy Colyer  (Member)
Councillor John Cowe  (Member)
Councillor John Divers  (Member)
Councillor Jérémie Fernandes  (Member)
Councillor David Gordon  (Member)
Councillor Juli Harris  (Member)
Councillor Sandy Keith  (Member)
Councillor Elaine Kirby  (Member)
Councillor Paul McBain  (Member)
Councillor Shona Morrison  (Member)
Councillor John Stuart  (Member)
Councillor Draeyk van der Horn  (Member)
Councillor Sonya Warren  (Member)
Clerk Name: Lissa Rowan
Clerk Telephone: 07765 741754
Clerk Email: committee.services@moray.gov.uk
Page 5

Page 6

Page 6

Page 7

MORAY COUNCIL
Minute of Meeting of the Economic Development and Infrastructure Services
Committee
Tuesday, 29 April 2025
Council Chambers, Council Office, High Street, Elgin, IV30 1BX
PRESENT
Councillor Tracy Colyer, Councillor John Cowe, Councillor John Divers, Councillor
Amber Dunbar, Councillor David Gordon, Councillor Juli Harris, Councillor Sandy
Keith, Councillor Elaine Kirby, Councillor Marc Macrae, Councillor Paul McBain,
Councillor Shona Morrison, Councillor John Stuart, Councillor Draeyk van der Horn,
Councillor Sonya Warren
APOLOGIES
Councillor Jérémie Fernandes
IN ATTENDANCE
The Depute Chief Executive (Economy, Environment and Finance), Head of
Environmental and Commercial Services, Head of Housing and Property Services,
Senior Engineer (Transportation), Paul Wolverson, Service Manager, Road
Maintenance Manager, Consultancy Manager, Property Asset Manager, Legal
Services Manager, Elaine Penny and James Smith, Engineer (Traffic) and the
Democratic Services Manager.
Also in attendance was Mr Luke Stevenson, petitioner in respect of Item 6 on the
agenda. 
1.         Chair
The meeting was chaired by Councillor Marc Macrae.
2.         Declaration of Group Decisions and Members Interests *
In terms of Standing Orders 21 and 23 of the Councillors’ Code of Conduct, there
were no declarations from Group Leaders or Spokespersons in regard to any prior
decisions taken on how Members will vote on any item on the agenda or any
declarations of Member’s interests in respect of any item on the agenda.
3.         Resolution
The meeting resolved that in terms of Section 50A (4) and (5) of the Local
Government (Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Item 11 of business on the
grounds that it involves the likely disclosure of exempt information of the class
described in the relevant Paragraphs of Part 1 of Schedule 7A of the Act.
Para Number of the
Minute Para Number of Schedule 7a
Item 3.
Page 7

Page 8

18
Para 6
Information relating to the financial or business affairs of
any particular person(s)
Para 9
Information on terms proposed or to be proposed by or to
the Authority
19
Para 8 & 9
Information on proposed terms and/or expenditure to be
incurred by the Authority
4.         Minute of meeting dated 4 February 2025
The minute of the meeting of Economic Development and Infrastructure Services
Committee dated 4 February 2025 was submitted and approved.
5.         Written Questions **
The Committee noted the following written question submitted by Councillor
Fernandes and the Council's response thereto:
Food and drink manufacturing accounts for 36% of Moray’s economy, compared to
just 4.4% across Scotland, making the region particularly exposed to export-
related challenges. Have Council Officers estimated the potential impact or cost of
the newly announced 10% US tariff on Moray’s economy? If not, what work is
underway—and what discussions have taken place with relevant agencies—to
assess and understand the likely impact on local businesses?
RESPONSE
Council Officers have been in dialogue with representatives from Highlands &
Islands Enterprise and the Chamber of Commerce.
The impact on the Moray economy is impossible to assess as there will be
businesses that benefit from now being more competitive than European and
Asian competitors and there will be others that will feel the shock either as direct
exporters or supply chain companies.  It is therefore too early to assess financial
impact.
Scottish Development International is currently reviewing and assessing the impact
for the whole of Scotland.  The Scotch Whisky Association will be examining the
impact on the Whisky industry.
Moray Chamber of Commerce are working with Scottish Government through the
Scottish Chamber of Commerce to get more for Scottish businesses.
The following contains a number of relevant links over the last two weeks from the
Department for Business and Trade on US Tariffs which is still a very fluid area:
• Please continue to direct business enquiries to Export support for UK
businesses – great.gov.uk. 
• President Trump announced over the weekend that he has added some goods
to the list of exemptions from tariffs, therefore suspending reciprocal tariffs on
Page 8

Page 9

a number of goods including semiconductors and smartphones. New guidance
has been published by the US Customs and Border Protection here. 
• Over the weekend, the UK Government announced new support for British
business, by way of increased government-backed financing via UK Export
Finance and the British Business Bank. More details here:  Government steps
in to back British business in changing world - GOV.UK. 
• You also may have seen over the weekend that the UK Government has
suspended tariffs on a range of imported goods into the UK: Government cuts
price of everyday items and summer essentials - GOV.UK.
• In terms of tariffs on imports, the UK Global Tariff tool is useful: Trade Tariff:
look up commodity codes, duty and VAT rates - GOV.UK . 
6.         A941 Petition Briefing Report
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking the Committee to consider the recently
submitted Petition PE2025-001 in relation to the Elgin - Lossiemouth Safety Spine
received from Mr Luke Stevenson, the terms of which stated:
We, the undersigned, call upon local authorities and transport agencies to prioritise
the safety of all road users on teh A941 and B9135 between Elgin and
Lossiemouth.  Implementing new safety infrastructure in the for of; no overtaking
lines along key areas of the road/junctions, new solar cats eyes to increase lane
visibility, street lighting along the path that will directly benefit pedestrians, cyclists
and road users, additional a filter lane on the A941 turning left to B9135 to improve
vision and field of view for road users joining the main road.  Furthermore, a
consideration could be made to reduce the speed of the road.
Such measures, alongside enhanced signage, reflective markers and regular
maintenance will protect all road users, including cyclists and pedestrians and
align with Moray's commitment to public safety.
The A941 is a critical route for residents, commuters and visitors, yet it has
become increasingly hazardous due to the growing volume of traffic, speeding and
adverse weather conditions common in the Moray region.  The lack of adequate
road separation contributes to collisions, endangering lives and causing distress to
families and communities.
Road safety is not a luxury but a necessity.  By investing in these improvements,
we can reduce accidents, save lives and ensure the A941 remains a safe and
reliable link between Elgin and Lossiemouth.
We urge the relevant authorities to act swiftly and make the A941 a model of road
safety for the Moray region.  Together, we can protect our community and secure a
safety future for everyone who uses this vital route.
Prior to discussion, Chair outlined to the Committee the procedure to be followed
in respect of considering the petition, which at this stage was regarded as a
preliminary hearing, along with the options open to the Committee on how the
petition be handled.
The Chair welcomed Mr Stevenson who outlined the terms of his petition.
Page 9

Page 10

The Head of Environmental and Commercial Services outlined the response to the
petition as detailed in the briefing report.
The Chair confirmed the options available to the Committee were:
1. Direct that the petition (in whole or part) proceeds to a full hearing, at the
next available date of this Committee, another appropriate service
committee or at a full meeting of The Moray Council; OR 
2. Reject the petition (in whole or in part), giving the reason for rejection; OR
3. For simple issues, instruct immediate action by the Council without any
further hearing or report; OR
4. Pass the petition to the relevant director and chairperson to look into, with
or without any specific direction as to action.
Councillor Macrae welcomed the petition, however stated that he was minded to
reject the petition.  He recognised the number of incidents on the particular stretch
of the A941, some of which have been tragic, however the road layout had not
been a factor in the recorded incidents on the road and that the main causes found
during the police investigation had related to driver error.
He further added that Officers have set out that whilst commendable, other than
the cat's eyes, the suggestions in the petition would not achieve the desired
results.
Elaine Penny, Senior Engineer (Traffic) confirmed that although the Council were
still waiting confirmation from Transport Scotland on the Council's Road Safety
Grant, the A941 would be included for improvements with regards to cats’ eyes,
however the prioritisation of the work still had to be agreed.
Both Councillor Cowe and van der Horn, welcomed the additional cats’ eyes being
installed but also acknowledged that driver behaviour needs to change.
Following further consideration, Councillor Macrae stated that there being no one
otherwise minded the Committee agree to reject the petition on the basis the that
Head of Environmental and Commercial Services write to Mr Stevenson to update
him on the planned actions for the road.  This was unanimously agreed.
7.         Environmental Protection Capital and Revenue Budgets
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) seeking to approve the plans to deliver the capital and
revenue programme in Environmental Protection in 2025/26.
Following consideration the Committee unanimously agreed to:
i) approve the plans to deliver the capital programme for 2025/26 as
contained in this report;
ii) grant delegated authority to the Service Manager (Open Space, Waste
Management, Catering & Facilities) to proceed with necessary maintenance
works and prioritise the works in accordance with any budgetary
restrictions;
Page 10

Page 11

iii) delegate authority to the Head of Environmental and Commercial Services
to apply for grants in support of the areas of work identified in sections 5;
and
iv) note the potential limitations and implications of the capital allocation for
2025/26 with regards improvements works in the Council’s recycling
centres, cemeteries and parks and open spaces.
8.         Environmental and Commercial Services and Economic Development
Capital and Revenue Budget Monitoring
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking the Committee to scrutinise and note the quarter
three position of 2024/25 regarding Environmental and Commercial Services and
Economic Growth and Development Services (Economic Development) Revenue
and Capital budgets.
Following consideration, the Committee unanimously agreed to note the quarter
three budget position for 2024/25.
9.         Roads Maintenance Revenue and Capital Budgets 2025-26
The Committee had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) seeking approval for the expenditure of funds allocated
from the 2025/26 Revenue and Capital Budgets for Roads Maintenance.
Following consideration the Committee unanimously agreed to:
i) approve the allocation of funds, from the Revenue and Capital Budget
2025/26 to Roads Maintenance activities, as outlined in Appendix A of the
report;  
ii) grant delegated authority to the Roads Maintenance Manager to proceed
with necessary roads maintenance works whilst noting that the Roads
Maintenance Manager will, as soon as possible, publish a list of schemes
which can be funded from the budget provision recommended in the report;
and  
iii) note that the list of schemes will be drawn up in accordance with the
principles and objectives detailed in the report, in the Roads Asset
Management Plan and in the Capital Plan.
10.         Transportation Capital and Revenue Budgets
The Committee had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing the Committee of plans to deliver the capital
and revenue programme in Transportation for 2025/26.
Following consideration the Committee unanimously agreed to:
i) approve the plans to deliver the capital and revenue programme for 2025/26
as contained in the report; and
Page 11

Page 12

ii) delegate authority to the Head of Environmental and Commercial Services to
apply for grants for the funding areas set out in the report at paras 5.33 and
5.48.
11.         Flood Risk Management and Bridges Capital and Revenue Budgets
2025-2026
The Committee had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) seeking approval of the proposed 2025/26 Capital and
Revenue programme of work for Flood risk Management and Bridge Maintenance.
Following consideration the Committee unanimously agreed:
i) the Flood Risk Management Schedule of Clearance and Repair for 2025/26;
ii) the programme of Bridge Maintenance works for 2025/26; and
iii) to delegate authority to the Head of Environmental and Commercial
Services to bid for grant funding that is made available throughout the year.
12.         Burial and Cremation (Scotland) Act 2016
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) updating and informing the Committee of the new
statutory requirements on the Council, as a burial authority, in line with the Burial
and Cremations (Scotland) Act 2016.
Following consideration, the Committee unanimously agreed to note:
i) the contents of the report; and
ii) the new mandatory responsibilities on the Council as a burial authority.
13.         Disabled Parking Review
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking the Committee to note the review of disabled
parking in Elgin.
Following consideration the Committee unanimously agreed to:
i) note the results of the parking survey for Elgin Town Centre;
ii) note the amendments to the disabled parking in the town centre as part of
the Levelling Up Fund (LUF) project; and
iii)
approve the introduction of new disabled parking spaces on the High Street
west of Batchen Street as part of works associated with the Levelling Up
Fund Town Centre projects and North Guildry Street, utilising part of the
25/26 budget for Disability Adaptations. 
14.         Roads Asset Management Planning
Page 12

Page 13

The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing the Committee of the latest road condition
and Road Asset Management Planning information.
Following consideration, the Committee unanimously agreed:
i) to note the latest Road Condition Indicator (RCI) results for the Council;
ii) that the RCI results continue to be monitored and reported back on an
annual basis to this Committee; and  
iii) to note the clear commitment to the use of Road Asset Management
Planning in the Council.
15.         North of Scotland Electric Vehicle Charging Infrastructure
Partnership
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) detailing the progress with identifying a preferred bidder
for the provision of electric vehicle (EV) chargers and services under the joint
Pathfinder project and agree the procurement vehicle to move to conclusion of the
procurement process and contract award.
Following consideration the Committee unanimously agreed to:
i) note the progress made in relation to a strategic partnership approach and
funding for electric vehicle charging infrastructure following the Electric
Vehicle Infrastructure Fund Strategy and Expansion Plan approved by this
Committee (para 9 of the minute of 7 February 2023 refers);
ii) delegate authority to the Head of Environmental and Commercial Services
in consultation with the Head of Governance, Strategy and Performance to
agree the formation of a Special Procurement Vehicle, Lead Authority
Model, in partnership with Aberdeen City, Aberdeenshire and Highland
Councils to deliver EV charging infrastructure, with Highland Council as the
Lead Authority, governed by a Joint Steering Board; and
iii) note that existing public electric vehicle charging infrastructure operated by
the Council is included in the Special Procurement Vehicle.
16.         Berthing Policy - Leisure
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) seeking approval of a revised berthing policy as set out
at Appendix 1 and described in the report.
Following consideration, the Committee unanimously agreed to approve the
revised berthing policy as set out in Appendix 1 to the report.
17.         Information Reports - if called in
The Committee noted that no Information Reports had been called in.
Page 13

Page 14

18.         West Beach Car Park Lossiemouth [Para 6 and 9]
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing the Committee of the current condition of the
car park at West Beach, Lossiemouth and of the legal position with regards to the
lease conditions and to seek approval on the direction of travel for how the car
park will be managed long term.
In terms of standing order 80, the Chair sought agreement from the Committee to
suspend standing order 75 and to continue the meeting after 12.45pm.  This was
unanimously agreed.
Following lengthy consideration, the Committee unanimously agreed:
i) to note the proposed preferential rankings at para 18.1;
ii) approve Option 1; and
iii) that the Council will endeavour to work with the landlord and the community
to secure future use of the site for public use, though it should be noted this
may not be achieved and the Council’s influence would be limited in this
regard.
19.         Review of Industrial Estate Report - [Para 8 and 9]
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) which sought Committee approval for the next steps in
relation to this estate.
Following consideration, the Committee unanimously agreed to:
i) note the contents of the review of this estate;
ii) approve the recommendation to market the site for sale and bring a
future report to the Corporate Committee outlining the outcome of the
marketing; and
iii) approve the appointment of an agent to market the estate as outlined in
paragraph 6.4.
Page 14

Page 15

Report
to:
Meeting Date:Economic
Development and
Infrastructure
Services Committee
17 June 2025
Report
by:
Report No:Depute Chief
Executive (Economy,
Environmental and
Finance)
ECS019/25/NM/SW
Author: Nicola Moss/Suzanne
Wilson
Contact Email: performance@moray.gov.uk
Subject: Performance Report (Environmental and Commercial Services) –
Period to March 2025
1. PURPOSE
☒ For Decision      ☐  For Information
1.1 The purpose of this report is to scrutinise performance in areas of Service Planning,
Service Performance and other related data to the end of March 2025 and note
actions being taken to improve performance where required.
1.2 This report is submitted to Committee in terms of Section III (A) (4) of the Council’s
Scheme of Administration to monitor performance in accordance with the Council’s
Performance Management Framework.
2. SUMMARY
2.1 At the end of March 2025, overall progress against the 2024/25 Service Plan was
59% complete, although this does include several longer-term actions with due dates
into 2026 and 2027.  Progress against Service Plan Priorities and Indicators and
operational Service Performance Indicators is presented in the table and charts
below. 
Item 5.
Page 15

Page 16

3. RECOMMENDATIONS
3.1 It is recommended that Committee:
i) scrutinises performance in areas of Service Planning, Service
Performance and other related data to the end of March 2025 and
note actions being taken to improve performance where required.
Suzanne Wilson
Research & Information Officer
4. BACKGROUND AND CONTEXT
4.1 Each service plan sets out the planned strategic and service level priorities and
outcomes it intends to deliver in the coming year aligning closely with financial
planning, corporate and community planning partnership strategic priorities.  
4.2 Progress on Service Plan priorities and outcomes and key areas of operational
performance is reported by exception, highlighting successes and giving assurances
around the challenges and actions to support.  Links to Service Plan Actions and
Performance Indicators can be accessed within the background papers section of this
report.
Page 16

Page 17

4.3 Complaints are reported in terms of time taken to respond, outcomes and learning
points.  Links to Complaints tables can be accessed within the background papers
section of this report.
4.4 Latest Local Government Benchmarking Framework (LGBF) results for 2023/24 are
published throughout the year with final results publication and data refresh in June. 
The full suite can be viewed via the LGBF Dashboard.  Published indicators for this
service have been incorporated with the relevant section of this report depending on
whether used to evidence progress against strategic, service level or service
performance priorities.  LGBF indicator targets and RAG status in the backing tables
is now based on ranking thresholds aligning with exception reporting.
4.5 The Sustainable Development Statement was approved by the Corporate Committee
on 5 November 2024 (para 16 of the Minute refers).  The Statement draws out the
way in which sustainable development is embedded in the Corporate Plan 2024-29
and wider corporate policies, strategies and plans with progress being reported
through several updates and reports, one of which is quarter 4 performance reporting.
Service Plan actions and indicators that underpin the delivery of Sustainable
Development Goals are highlighted in backing table documents and comment where
relevant is incorporated in this report.  An overview of progress will be presented in
the Corporate Plan progress update in due course.
5. PROPOSALS
Successes – Service Plan Strategic & Service Level Outcomes and operational
Service Performance
5.1 The Bus Revolution project has progressed as planned.  Following community
engagement sessions and an online survey on the future expansion of the m.connect
service, analysis is being carried out by Highlands & Islands Enterprise for the Project
Board.  Driver recruitment is almost complete along with procurement of charge units
and vehicles.  Phase 2 is on track to begin in May supported by a schedule of planned
public information and marketing activity.  Monitoring will continue as part of the 2025-
2028 Service Plan.  (Strategic Action ECS24-25 Strat 4.1)
5.2 Delivery of the Fleet EV Strategy actions in the reporting period is complete.  Electric
Vehicles now account for 16% of the Fleet with the number acquired this year
exceeding target at 22.  103 chargers are now available with solar panels identified as
a renewable energy option for Ashgrove.  Work to facilitate installation is now
ongoing.  (Service Level Action ECS24-25 Serv 5.2.1, Service Level PIs ECSRMF14
and 15)
5.3 A programme of headstone inspections has been successfully implemented with 976
stability checks complete in Cullen and Tomintoul and re-inspections undertaken
across 6 other cemeteries.  Specialist contractors are scheduled to make safe several
complex headstones with further inspections planned for the second half of 2025/26. 
(Service Level Action ECS24-25 Serv 5.5.3)
5.4 For the second year, 93% of all primary schools have delivered Bikeability sessions
against a target of 72% while 370,201 sustainable journeys were recorded by the
Page 17

Page 18

Travel Tracker programme, an increase of 11,149 (3%). (Service Level PIs
ECSTTM01 and 05)
5.5 Latest LGBF data for 2023/24 shows Moray ranked in the top quartile for four cost
performance indicators relating to Environmental and Commercial Services.  Net cost
of Waste Collection per premise was £39.97, well below the national average of
£78.72 ranking Moray 2nd nationally and 1st against family group authorities.  Net
cost of Street Cleaning per 1,000 population was £8,376 against the national average
of £15,961 with Moray ranked 4th nationally and 1st in the family group.  Cost of
maintaining roads per kilometre was £7,337 compared to £13,788 nationally placing
Moray 6th in Scotland and 1st against family group authorities.  Cost of parks and
open spaces per 1,000 population was £18,010 against a national average of
£23,362, placing Moray 8th nationally and 2nd in the family group.  (Service PIs
ENV01a, ENV03a, ENV04a and C&L04)
5.6 In addition to the low cost of waste collection, Moray was placed in the top quartile
with 55.2% of total household waste arising that is recycled, above the national
average of 43.5%, placed 4th nationally and 2nd within the family group.  (Service PIs
ENV06)
5.7 Performance against Indicators measuring road condition in three of four road class
categories (B, C and unclassified) is ranked within the top quartile nationally and 1st
within the family group, with A class roads placed 13th and 3rd respectively.  As is
always the case, there are nuances around these performance measures which must
also be considered, such as allied satisfaction levels, the sustainability of asset
management policies which support these rankings and others. However, these
results do demonstrate strong performance levels in the areas highlighted.  (Service
PIs ENV04c, ENV04d and ENV04e)
Challenges and actions to support – Service Plan Strategic & Service Level
Outcomes and operational Service Performance
5.8 In relation to the Town Centre Improvement Plans, funding has now been confirmed
and options for streetscape improvement prepared for two towns (Dufftown and
Forres).  The final programme of work, to be led by Economic Growth and
Development, is expected to be agreed in 2025/26.  Work will continue as part of the
2025-2028 Service Plan (Service Level Action ECS24-25 5.1.1)
5.9 With recruitment to some key vacancies proving challenging, work to deliver Surface
Water Management Plans for Forres by March 2025, is on hold.  This action will be
carried forward in the 2025-2028 Service Plan with a revised due date of March 2027.
(Service Level Action ECS24-25 5.3.1)
5.10 In conjunction with existing harbour users and relevant stakeholders, development of
the Buckie Harbour Masterplan remains ongoing. A workshop was held with elected
members in March 2025, and additional drawings are being prepared. A final
document, setting out the long-term aspirations of the Harbour, is expected during the
first half of 2025/26.  (Service Level Action ECS24-25 5.4.1)
5.11 Although competing work demands have delayed the planned Tree Strategy, surveys
and maintenance work have been undertaken using existing budget.  Developing a
Page 18

Page 19

Tree Strategy will continue outwith original due date as part of the 2025-2028 Service
Plan.  (Service Level Action ECS24-25 5.5.1)
5.12 The creation of a burials administration service is behind schedule.  Publication of
regulations linked to the Burials and Cremation (Scotland) Act was later than
expected with work now prioritised to meet the requirements of the statutory burial
forms, introduced from 01 March 2025.  An update was provided to a meeting of this
committee on 29 April 2025 (item 12 of the agenda refers) and work will continue as
part of the 2025-2028 Service Plan.  (Service Level Action ECS24-25 5.5.4) 
5.13 There has been no change with the national Deposit Return Scheme with an
anticipated launch date still 2027.  This will continue to be monitored by the Service.
(Service Level Action ECS24-25 5.7.1)
5.14 Progress of compliance with Waste Upholstered Domestic Seating (WUDS)
containing Persistent Organic Pollutants (POPs) is reported at 85% complete. 
Discussions have taken place with air quality specialists however with spend on
equipment still to be confirmed, industrial shredding remains on hold.  (Service Level
Action ECS24-25 5.7.2)
5.15 The Open Spaces self-assessment, using the PSIF process, is nearing completion. 
Following consensus workshops, an Action Plan has been drafted.  Once finalised,
this will be monitored through team plans and meetings.  PSIF will continue as part of
the 2025-2028 Service Plan with Waste identified as the next area to participate.
(Service Level Action ECS24-25 5.9.1)
5.16 As at March 2025, 59 of 64 principal inspections of council bridges are complete.  A
further 5 inspections were deferred due to the requirement for CCTV pushing costs
beyond available budget.  (Service Level PI ECSCON01)
5.17 Department efficiencies have helped reduce vehicle and plant maintenance unit costs
however they remain above the target of £205 at £232.  Fleet Services vacancies
have been filled which will help reduce costs further.  (Service PI ECSRMF02)
5.18 Although still above target, the net unit cost per passenger for m.connect has
improved throughout 2024/25 and is now £7.96.  With Phase 2 of the project
launching in May, work to develop a revised target for this service is ongoing. 
(Service PI ECSTPT01)
5.19 LGBF data for 2023/24 shows 75.7% of adults were satisfied with refuse collection,
against a national average of 78.3%, moving Moray into the lowest quartile ranked
25th nationally and 6th within the family group. This should be set against the positive
performance in terms of levels of recycling and cost of waste collection and disposal. 
A recent review of complaints (para 5.20 refers) has resulted in some procedural
changes relating to Household Collections which should improve satisfaction rates in
future.  (Service PI ENV07a)
Complaints and MP/MSP Enquiries
5.20 Following the performance report covering the period to September 2024, complaints
have been reviewed and improvements introduced to target issues within Waste
Page 19

Page 20

Management, Open Spaces and Road Maintenance.  This included identifying best
practice with other authorities via the Local Authority Complaints Handling Network
(LACHN).  Since then, complaints received have fallen, with 96 recorded during the
second half of 2024/25.  This will continue to be monitored with further improvements
introduced.
5.21 103 complaints were closed during the reporting period; 94 as Frontline and 9 as
Investigative.  51 complaints were upheld or partially upheld while 44 were not upheld.
8 were closed as resolved.  80 Frontline complaints met the 5 working day target
timescale, with the average time to respond 3.84 days.  The average response time
for Investigative complaints was 29.25 days.  22 upheld or partially upheld complaints
related to Missed Bins.  With most cases, no clear reason was identified though some
routes had been affected by crew changes. 
5.22 Environmental and Commercial Services received 55 MP/MSP enquiries during the
second half of 2024/25.  Common issues were Road Safety and the Winter
Maintenance programme.  All were responded to and closed.
Other Performance (not included in the Service Plan)
5.23 Primary school meal uptake has increased year on year for universal free school
meals, ending the year close to the target. Uptake in meals from Primary 6 and 7
improved during the year and is better than target but is down a little on long term
(multi year) trend. The challenges around balancing appealing meals with the food
regulations continues to play a part in this performance. Whilst harder to measure in
terms of a percentage uptake, income for secondary school meals has increased
through 24/25 indicating increased uptake in secondary meals which is positive
progress.
5.24 Although budgeted car park income fell below projected levels in 2024/25, with
actions planned for 25/26 to further promote the value for money parking
opportunities, the sampled occupation surveys demonstrated occupancy levels
closely in line with previous years, above the 50% target. The occupancy measure is
a sample snapshot which can be used to compare trends, but for example, doesn’t
reflect where individual spaces are used by multiple vehicles during a single day.
Case Studies
5.25 Nothing to report.
Page 20

Page 21

Consultation and Engagement
5.26 As highlighted in para 5.1, a series of community engagement events and an online
survey were undertaken in relation to the expansion of the m.connect service.  Over
600 responses were received on the proposed changes with analysis ongoing to
identify key themes. 
5.27 Other consultation work during the second half of 2024/25 included surveys around
school meals, sustainable travel and the national roads survey for benchmarking by
the Association of Public Sector Excellence (APSE).  Participatory budgeting
engagement was also undertaken for play park renewals in Forres, Hopeman and
Lossiemouth.
6. SUMMARY OF IMPLICATIONS
6.1 The table below shows whether risks and implications apply if the recommendations
are agreed:
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement
Plan)
X
Policy and Legal X
Financial X
Risk X
Staffing X
Best Value and Transformation X
Property X
Information Communications Technology/Digital X
Equalities. Social Inclusion and Economic Impact X
Climate Change and Biodiversity Impact X
6.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic
plans.
a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following
Council Plan strategic priorities:
☐ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.
b) Links to Local Outcomes Improvement Plan – The proposals in this report
support and contribute to improved outcomes for communities as outlined in the
following local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
Page 21

Page 22

☐ Improving wellbeing of our population
6.3 Policy and Legal
The Council has a statutory requirement to publish a range of information that will
demonstrate that it is securing best value and assist in comparing performance both
over time and between authorities where appropriate.
6.4 Financial
None arising from this report.
6.5 Risk
None arising from this report.
6.6 Staffing
None arising from this report.
6.7 Best Value and Transformation
How councils plan for, manage and report on performance is a key area of focus in
external audit work, particularly on best value.
6.8 Property
None arising from this report.
6.9 Information Communications/Technology/Digital
None arising from this report.
6.10 Equalities, Social Inclusion and Economic Impact
None arising from this report.
6.11 Climate Change and Biodiversity Impacts
None arising from this report.
7. CONSULTATION
7.1 This report has been prepared in consultation with the Head of Environmental and
Commercial Services and relevant Service Managers and any comments made have
been incorporated into the report.
8. BACKGROUND PAPERS
8.1 Service Plan Actions
Service Plan Performance Indicators
Service Performance Indicators
Service Complaints
Page 22

Page 23

Report
to:
Meeting
Date:
Economic Development
and Infrastructure
Services Committee
17 June 2025
Report
by:
Report No:Depute Chief Executive
(Economy,
Environmental and
Finance)
EGD009/25/BS/SW
Author: Beverly Smith/Suzanne
Wilson
Contact
Email:
performance@moray.gov.uk
Subject: Performance Report (Economic Growth and Development) – Period
to March 2025
1. PURPOSE
☒ For Decision      ☐  For Information
1.1 The purpose of this report is to scrutinise performance in areas of Service Planning,
Service Performance and other related data to the end of March 2025 and note actions
being taken to improve performance where required.
1.2 This report is submitted to Committee in terms of Section III (A) (4) of the Council’s
Scheme of Administration to monitor performance in accordance with the Council’s
Performance Management Framework.
2. SUMMARY
2.1 At the end of March 2025, overall progress against the 2024/25 Service Plan actions
reported to this committee was 72% complete.  Progress against Service Plan Priorities
and Indicators and operational Service Performance Indicators is presented in the table
and charts below.
Item 6.
Page 23

Page 24

3. RECOMMENDATIONS
3.1 It is recommended that Committee:
i) scrutinises performance in areas of Service Planning, Service
Performance and other related data to the end of March 2025 and note
actions being taken to improve performance where required.
Suzanne Wilson
Research & Information Officer
4. BACKGROUND AND CONTEXT
4.1 Each service plan sets out the planned strategic and service level priorities and
outcomes it intends to deliver in the coming year aligning closely with financial
planning, corporate and community planning partnership strategic priorities.  
4.2 Progress on Service Plan priorities and outcomes and key areas of operational
performance is reported by exception, highlighting successes and giving assurances
around the challenges and actions to support.  Links to Service Plan Actions and
Performance Indicators can be accessed within the background papers section of this
report.
4.3 Complaints are reported in terms of time taken to respond, outcomes and learning
points.  Links to Complaints tables can be accessed within the background papers
section of this report.
4.4 Latest Local Government Benchmarking Framework (LGBF) results for 2023/24 are
published throughout the year with final results publication and data refresh in June. 
The full suite can be viewed via the LGBF Dashboard.  Published indicators for this
service have been incorporated with the relevant section of this report depending on
whether used to evidence progress against strategic, service level or service
Page 24

Page 25

performance priorities.  LGBF indicator targets and RAG status in the backing tables is
now based on ranking thresholds aligning with exception reporting.
4.5 Scottish Local Authorities Economic Development Group (SLAED) publish an annual
report under the SLAED Indicators Framework.  This report sets out a range of data
and information to evidence the contribution made through economic development
activities, providing a basis for collating consistent data used to better understand
impact and identify potential areas for improvement.  With no capacity to complete a
separate report, latest data for 2023/24 has been included within backing tables where
appropriate and a summary provided from para 5.12. 
4.6 The Sustainable Development Statement was approved by the Corporate Committee
on 5 November 2024 (para 16 of the Minute refers).  The Statement draws out the way
in which sustainable development is embedded in the Corporate Plan 2024-29 and
wider corporate policies, strategies and plans with progress being reported through
several updates and reports, one of which is quarter 4 performance reporting.  Service
Plan actions and indicators that underpin the delivery of Sustainable Development
Goals are highlighted in green within the backing table documents and comment where
relevant is incorporated in this report.  An overview of progress will be presented in the
Corporate Plan progress update in due course.
5. PROPOSALS
Successes – Service Plan Strategic & Service Level Outcomes and operational
Service Performance
5.1 Work relating to Employability is complete for 2024/25 with projects tackling child
poverty, support for people with disabilities and improving access to community hubs. 
During quarter 4, assistance was also provided to employees affected by the closure of
St Giles Centre.  Although recently published LGBF data for 2023/24 shows the
percentage of Unemployed People assisted into work through council programmes fell
to 4.3% (against a national average of 12.1%), this was due to delays in confirmation of
grant funds that led to fewer employer applications to the Moray Employer Recruitment
Incentive (MERI) Scheme.  This delay was a contributory factor in a decline across
Scotland.  Job outcomes have increased in 2024/25 with the Sector-based Work
Academy Programme (SWAP) having a positive impact on results.  Collaboration has
also improved with employers and partners including Moray Chamber of Commerce
and DYW Moray.  This work will continue as a priority in the 2025-2028 Service Plan. 
(Strategic Action EGD24-25 4.3, Strategic Level PI ECON01)
5.2 Development of proposals for Just Transition Bids is progressing.  Following a series of
initial workshops which will be followed by workshops with members, a report will be
prepared for Committee.  Officers remain in contact with Scottish Government officials.
(Service Level Action EGD24-25 5.6.1)
5.3 Claimant count as a percentage of working age population continues to be low at 2.2%
with Moray ranked in the top quartile nationally against a Scottish average of 3.1% and
first against a family group average of 2.5%.  (Service PI ECON12a)
Challenges and actions to support – Service Plan Strategic & Service Level
Outcomes and operational Service Performance
5.4 At the end of March 2025, 7 Moray Growth Deal projects have reached the
Government threshold for entering the delivery phase: Bus Revolution, Cultural
Quarter, EY STEM, Digital Health, Housing Mix Delivery, Business Enterprise Hub and
Page 25

Page 26

Manufacturing and Innovation Centre for Moray (MICM)).  Further progress with the
Business Enterprise Hub is expected by the end of June following completion of
conditions set by the UHI-Moray Board. Although work is ongoing to finalise the
Business Enterprise Hub, significant progress has been made with Moray Growth Deal
projects this year, with the team working extensively alongside Community Planning
and Moray Growth Deal Boards and policy advisors from the UK and Scottish
Governments to ensure approval of all stated projects was achieved successfully.  As a
result, there is now greater clarity around the work planned for 2025/26 and what these
projects will deliver for local communities.   
Moray Growth Deal work will continue as a priority within the 2025-2028 Service Plan.
(Strategic Action EGD24-25 4.1). 
5.5 Although the Community Wealth Building Strategy and Action Plan has continued to be
affected by resourcing issues, work to develop a Community Identified Benefits portal is
complete.  The post of temporary full time Community Wealth Building Officer has also
been filled with the successful candidate expected in post on 2 June 2025.  At this time,
the portal will go live and be marketed to both the local community and prospective
suppliers.  Delivery of this Strategy and Action Plan will continue within the 2025-2028
Service Plan.  (Strategic Action EGD24-25 4.2)
5.6 Actions contributing to supporting access to affordable childcare continue outwith
original due dates.  The School Aged Childcare (SACC) 5–12-year-olds project has
several work streams in place, including Grant schemes, collaboration with m.connect
and a childcare project in Kinloss.  An update and next steps report is due at a meeting
of the Community Planning Board in June.  Both actions will continue in the 2025-2028
Service Plan.  (Strategic Action EGD24-25 4.4) 
5.7 An update on Town Centre Regeneration work was provided to the meeting of Planning
and Regulatory Services on 17 December 2024 .  Work to deliver the work plan has
been affected by delays with Levelling Up funding confirmation.  Going forward, plans
will be reviewed and reflected in the new placed based Local Development Plan with
more detail on progress available during 2025.  This work will continue as part of the
2025-2028 Service Plan. (Strategic Action EGD24-25 4.6)
5.8 Actions relating to Building Heat and Electricity and Operating Emissions are reported
at 85% and 80% complete against a due date of March 2025.  The Solar Panel project
involving 4 corporate buildings is progressing with work anticipated to complete by
June 2025.  Climate Change Awareness training is now an essential module for all new
staff while a Local Climate Impact Assessment has been drafted.  Work around Climate
Change and Biodiversity will continue as part of the 2025-2028 Service Plan with
revised timelines to the end of 2025.  (Service Level Action EGD24-25 5.3.1 and 5.3.2)
5.9 Despite a slight increase in proportion of properties receiving superfast broadband to
87.8%, Moray remains below the national average of 95.9% and is ranked within the
lowest quartile.  Scottish Government reports the rollout of the R100 broadband
scheme in Moray will not be completed until 2028 with the programme behind initial
time targets.  This is similar for other authorities in the North region.  (Service PI
ECON08)
Complaints and MP/MSP Enquiries
5.10 A total of sixteen complaints were received during the second half of 2024/25. 
Fourteen complaints were closed, one at Frontline and thirteen at the Investigative
stage.  Two complaints were either upheld or partially upheld while twelve were not
Page 26

Page 27

upheld.  The target timescale of 5 working days was met for the closed frontline
complaint however investigative complaints took slightly longer with an average
response time of 24 days.  For the two complaints upheld or partially upheld, staff have
been reminded to take care when entering private property while systems have been
checked to ensure requested updates are processed correctly.
5.11 Economic Growth and Development received twenty-one MP/MSP enquiries during the
second half of 2024/25.  Common issues included planning and Community
Safety/ASB concerns.  All were responded to and closed.
Other Performance (not included in the Service Plan)
5.12 Latest data published within the Scottish Local Authorities’ Economic Development
(SLAED) Performance Framework shows spending on Economic Development &
Tourism fell by £398,000 however activity improved with more Business Gateway
events and some involvement in the Supplier Development Programme.  Business
Start Ups per 10,000 population also increased as did Gross Weekly Earnings
(workforce based), Gross Value Added per Hour and Gross Value Added per job filled. 
5.13 A worsening short-term trend was evident across the output indicators covering
Economic Development activity due to pressure on resources.  This also affected
additional external funding due to council bids, which fell to £96,050, as resources are
required to both manage the project and support community groups during delivery. 
Significant support has been provided to several groups in recent years.  Due to
changing deadlines and criteria, not all have chosen to enter a final submission
however additional funding of £1.8million has been confirmed for the Forres
Conservation Heritage Scheme (FCHS).  This will be reported within 2024/25 SLAED
data.  It should also be noted that in previous years, European Social Funding bids
were included in this PI however allocations from the UK Shared Prosperity Fund (the
replacement for European funds) are excluded. 
Case Studies
5.14 A multi-Agency short life group was quickly established in response to the closure of St
Giles shopping centre in Elgin.  This provided a forum to coordinate actions ensuring
businesses and individuals at risk of redundancy were supported.  Emergency funding
was awarded through the UK Shared Prosperity fund to those businesses that applied
to support their re-location costs to other sites within the town centre. 
Consultation and Engagement
5.15 Nothing to report.
6. SUMMARY OF IMPLICATIONS
6.1 The table below shows whether risks and implications apply if the recommendations
are agreed:
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement
Plan)
X
Policy and Legal X
Financial X
Risk X
Staffing X
Page 27

Page 28

Best Value and Transformation X
Property X
Information Communications Technology/Digital X
Equalities. Social Inclusion and Economic Impact X
Climate Change and Biodiversity Impact X
6.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans.
a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following
Council Plan strategic priorities:
☐ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☐ Improving wellbeing of our population
6.3 Policy and Legal
The Council has a statutory requirement to publish a range of information that will
demonstrate that it is securing best value and assist in comparing performance both
over time and between authorities where appropriate.
6.4 Financial
None arising from this report.
6.5 Risk
None arising from this report.
6.6 Staffing
None arising from this report.
6.7 Best Value and Transformation
How councils plan for, manage and report on performance is a key area of focus in
external audit work, particularly on best value.
6.8 Property
None arising from this report.
6.9 Information Communications/Technology/Digital
None arising from this report.
6.10 Equalities, Social Inclusion and Economic Impact
None arising from this report.
6.11 Climate Change and Biodiversity Impacts
Page 28

Page 29

None arising from this report.
7. CONSULTATION
7.1 This report has been prepared in consultation with the Head of Economic Growth and
Development and relevant Service Managers and any comments made have been
incorporated into the report.
8. BACKGROUND PAPERS
8.1 Service Plan Actions
Service Plan Performance Indicators
Service Performance Indicators (including SLAED Framework)
Service Complaints
Page 29

Page 30

Page 30

Page 31

Report to: Meeting Date:Economic Development
and Infrastructure
Services Committee
17 June 2025
Report by: Report No:Depute Chief Executive
(Economy, Environment
and Finance)
EGD015/25/RG/LM
Author: Rhona Gunn / Nicola
Moss / Beverly Smith /
Edward Thomas
Contact
Email:
cmtadmin@moray.gov.uk
Subject: Economy, Environment and Finance (EEF) Service Plans 2025-28
1. PURPOSE
☒ For Decision      ☐  For Information
1.1 To invite the Committee to consider the Economy, Environment and Finance Service
Plans for 2025-26, noting that the Service Plan for Financial Services will be
considered at Corporate Committee on 10 June 2025, the Housing and Property
Services Plan also at the Housing and Community Safety Committee on 24 June 2025
and the Economic Development and Growth (EDG) Service Plan also at Planning and
Regulatory Services Committee on 12 August 2025 , each in terms of their respective
remits. There are no community safety actions in the EDG Plan that would require this
also to be reported to Housing and Community Safety Committee.
1.2 This report is submitted to Committee in terms of Section III (A) (4) of the Council’s
Scheme of Administration relating to monitoring performance of the services within the
Committee’s remit in accordance with the Council’s Performance Management
Framework.
2. SUMMARY
2.1 Service Plans have been prepared identifying the improvements targets for 2025-28. 
In preparing the plans, managers have taken account of risk, performance data, the
LOIP, the Corporate Plan and other relevant factors such as audit and inspections
outcomes.  The Service Plans also identify the resources allocated to each service.
3. RECOMMENDATIONS
3.1 It is recommended that Committee:
Item 7.
Page 31

Page 32

i) Consider and approve the Service Plan for Economic Growth and
Development for the year ahead in Appendix 1;
ii) Consider and approve the Service Plan for Housing and Property
Services for the year ahead in Appendix 2; and
iii) Consider and approve the Service Plan for Environmental and
Commercial Services for the year ahead in Appendix 3.
Rhona Gunn
Depute Chief Executive (Economy, Environment and Finance)
4. BACKGROUND AND CONTEXT
4.1 Service planning is a key aspect of the Council’s Performance Management
Framework and is undertaken annually to set out the strategic direction for services
over the coming months.
4.2 It should be noted that actions from the Best Value Action Plan, agreed by the
Corporate Committee on 23 April 2024 (para 6 of the minute refers) will be monitored
and reported out with the Service Plan process.
4.3 The service planning process focuses on forward planning for medium-term activities
supporting delivery of the Local Outcomes Improvement Plan (LOIP) and Corporate
Plan.  The Council’s planning process also includes team plans that focus on short
term tactical and operational activities supporting delivery of the Service Plan and
strategies and Employee Review and Development Plans (ERDP) and Professional
Review and Development (PRD) plans provide individual planning for employees’
activities and development.
4.4 As well as identifying service developments and improvements, the Service Plan
Framework requires an assessment of the output and outcome requirements for
services based on the Council’s priorities, statutory and regulatory requirements and
other relevant local and national direction and makes use of improvement tools for
planning and continuous improvement.  Services are planning to support their
improvement work with the Public Sector Improvement Framework (PSIF), which the
Council is in the process of re-invigorating for relevant services.  Across services,
priority outcomes are those included in the Council’s Corporate Plan 2024-29 that
directly relate to the service or are influenced by the service and should be clearly
identified.
4.5 Setting clear measurable outcomes and defining key indicators by which progress will
be assessed continues to be an area for development within the Council.  However, it
is recognised that for some actions it can be difficult to identify a measurable outcome
(e.g. a change in legislation that must be implemented or updating a policy framework).
Therefore, as far as possible efforts have been made to set measurable outcomes for
service plan actions but in some cases outputs and key progress milestones have been
used so that it is still possible to measure whether the action has been progressed as
intended.
4.6 A summary of progress is given below for each of the services based on the
performance monitoring carried out throughout the year by the services and reported to
committee as part of performance reporting. 
Page 32

Page 33

4.7 It should be noted that while there will be some re-organisation of teams and alignment
of services as a result of the management restructure, service plans have been
prepared taking account of council priorities, national priorities and ongoing and
emerging service priorities.  Therefore, it remains appropriate to seek approval for the
annual refresh of service plans to ensure that they continue to reflect the next iteration
of priorities and direction from committee and that services are appropriately directed
and tasked.
5. PROPOSALS
5.1 The focus of the new plan is for 2025-26 although the services have set high level
priorities for a three-year period 2025-28 with actions being reviewed annually.  It
should be noted that these paragraphs on focus have not been specifically tailored for
each committee’s specific remit and full rather than extract Service Plans are produced.
Scrutiny of these should however be directed towards areas within each committee’s
remit.
Economic Growth and Development
5.2 Progress on planned work (success)
 Elgin Town Board established and Investment Plan submitted successfully to UK
Government.
 LDP Evidence Report submitted to Gatecheck by agreed deadline and the first in
Scotland.
5.3 Progress on planned work (areas for development / not delivered)
 Delivery of the Community Wealth Building Strategy and Action Plan was affected
by both staff and financial resourcing issues. 
 Resourcing issues delayed the 12-week consultation relating to Guidance for Policy
11)c in NPF4.  This is now planned for May 2025.
 The review and preparation of National Planning Improvement Framework
responses continues in line with revised Improvement Service deadlines.
 Development of a Carbon Offsetting Plan was delayed due to deferral of the Net
Zero report and requirement to update the Climate Change Strategy.
 Work to develop proposals for the Just Transition Strategy remains ongoing
following workshops with partner organisations.
5.4 Planned focus in new plan (reflecting above and challenges to come)
 Delivery of Moray Growth Deal projects.
 Delivery of Community Wealth Building actions.
 Continue to improve access to work, employment and training through delivery of a
joined-up Skills Planning approach and increased availability of school aged
childcare.
 Delivery of Levelling Up Fund elements of the Elgin City Masterplan.
 Economic Growth and Regeneration through investment plan for Elgin,
Conservation & Heritage Scheme and new museum operating model for Forres and
development of a Moray Visitor Levy.
 Legislative and Regulatory work around the Moray Local Development Plan,
guidance for Policy 11c) in NPF4, an improvement plan relating to the Planning
Improvement Framework, final guidance relating to Developer Obligations and an
improvement plan for Environmental Health.
 Climate Change and Routemap to Net Zero.
Page 33

Page 34

5.5 The service plan is attached Appendix 1.
Housing and Property Services
5.6 Progress on planned work (success)
 The delivery of housing, investment and affordable housing supply programmes
were successful. The Strategic Housing Investment Plan (SHIP) approved in
November 2024 and methodology prioritising development opportunities agreed.
 Housing Revenue Account (HRA) business plan review completed and approved in
November 2024. Findings shared with members in February 2025.
 Tenant Survey completed in August-September 2024 and Improvement Plan
approved by Committee in February 2025.
 The review of existing gas servicing systems undertaken and completed enabling
the streamlining of processes.
 Tenants consulted on rent increases and proposals for the next three financial years
agreed at committee in February 2025.
 Revised Absence Management procedures applied by all managers.
5.7 Progress on planned work (areas for development / not delivered)
 The implementation of repairs improvement plan and work to develop self-service
options have had completion dates extended into 2025-26, with both actions being
carried forward within 2025-28 Service Plan.
 Work to improve energy efficiency is ongoing, with contracts in place to continue the
work into 2025-26. Action to be carried forward within 2025-28 Service Plan.
 Evidence from Tenant Survey indicates some improvement milestones have not
been met. Improvement Plan aims to address the areas for improvement.
 The option for gas servicing systems appraisal for improvement has been delayed.
The final stage of consultation to be considered by Transformation Board in June
2025.
 Action to identify opportunities for efficiency across staff teams has been deferred
and will be carried forward within 2025-28 Service Plan.
5.8 Planned focus in new plan (reflecting above and challenges to come)
 Delivery of the Housing, Investment and Affordable Housing Supply programmes.
 Reduce the number of children in temporary accommodation, the duration of
homelessness for families and the impact of homelessness on children.
 Review of Depot & Stores – Improvement and rationalisation of estate.
 Implement the Repairs and Improvement Plan.
 Revise the Housing Contribution Statement with Health & Social Care Moray.
 Achieve strategic alignment of allocations, operations and Development between
the Council and IJB.
 Continue to improve the Council’s housing stock and reduce the carbon impact
arising from Housing & Property Services.
 Complete option appraisal for improvements to the gas service scheduling system
and develop an implementation plan for the identified solution.
 Review, consult and approve team interdependencies with changes to be
incorporated and aligned with corporate structural changes.
 Review of Refugee Resettlement Team to incorporate team with Housing & Property
Services.
 Ensure revised operational implementation of absence management procedures are
applied by managers.
Page 34

Page 35

5.9 The service plan is attached Appendix 2.
Environmental and Commercial Services
5.10 Progress on planned work (success)
 Coastal Adaption Plans were approved by committee in April 2024.
 Additional vehicles to the Council’s EV fleet surpassed target.
 Implementation of a rolling programme of headstone inspections is complete.
5.11 Progress on planned work (areas for development / not delivered)
 Resourcing issues have delayed Surface Water Management Plans improvement
work in Forres
 The Buckie Harbour Masterplan development remains ongoing in conjunction with
relevant stakeholders. 
 Competing priorities affected progress of the development of a Tree Strategy. 
Where possible assessments have been undertaken using current resources and
budget.
 Work to create a Burials Administration Service is behind schedule.  Now
regulations linked to the Burials and Cremations (Scotland) Act 2016 have been
confirmed, work will progress during the first half of 2025.
 The Deposit Return Scheme continues to be delayed nationally.  Work will
commence when further guidance is received.
 Disposal of Waste Upholstered Domestic Seating (WUDS) containing Persistent
Organic Pollutants (POPs) remains on hold with work ongoing to ensure compliance
with SEPA regulations.
5.12 Planned focus in new plan (reflecting above and challenges to come)
 Delivery of Phase 2 of the Bus Revolution project.
 Improve Asset Management relating to retaining walls, network bridges and open
spaces.
 Increase burial capacity through the creation of a new cemetery. 
 Climate change work relating to our road network, winter operational plans and
Active Travel.
 Delivery of public EV Charging Infrastructure Strategy.
 Continue to develop Surface Water Management Plans and deliver Coastal
Adaption Plan.
 Ensure compliance and efficiency in Fleet Services and with a new Burials
Administration Service.
 Maximise opportunities and growth through Buckie Harbour Masterplan, Town
Centre Improvement Plan and delivery of the Levelling Up Fund elements of the
Elgin City Masterplan.
5.13 The service plan is attached Appendix 3.
6. SUMMARY OF IMPLICATIONS
6.1 The table below shows whether risks and implications apply if the recommendations
are agreed:
SUBJECT YES NO
Page 35

Page 36

Corporate Plan and 10 Year Plan (Local Outcome Improvement
Plan)

Policy and Legal 
Financial 
Risk 
Staffing 
Best Value and Transformation 
Property 
Information Communications Technology/Digital V        
Equalities. Social Inclusion and Economic Impact 
Climate Change and Biodiversity Impact 
6.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans.
a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following
Council Plan strategic priorities:
☐ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☐ Improving wellbeing of our population
6.3 Policy and Legal
None arising from this report.
6.4 Financial
None arising from this report.
6.5 Risk
There are potential risks around progress in all priority areas due to staffing pressures
and which often has an impact on officers.
6.6 Staffing
There are no staffing issues.  The service plan actions will be accommodated within
existing resources.
The services have undertaken workforce planning to consider how best to prepare and
manage the workforce for the services to be able to respond to the agreed Council
priorities in the Corporate Plan and the service work that is required to support and
achieve those objectives.   Consideration has also been given to the Council Workforce
Strategy and Plan priorities in a service context.  The main themes arising from these
include:
Page 36

Page 37

 Building capacity and resilience
 Change management and a workforce culture to support and enable change
 Health and Well-being management (including absence management)
 Recruitment and retention
6.7 Best Value and Transformation
The service plans support the council to continue its Best Value journey.
6.8 Property
None arising directly from this report.
6.9 Information Communications/Technology/Digital
None arising from this report.  However, where relevant work is set out within the
workforce plans to ensure that the workforce is ready and enabled for change,
including digital skills.
6.10 Equalities, Social Inclusion and Economic Impact
None arising from this report.
6.11 Climate Change and Biodiversity Impacts
None arising directly from this report.
7. CONSULTATION
7.1 This report has been prepared in consultation with the service managers in Economic
Growth and Development, Housing and Property and Environmental and Commercial
and any comments made have been incorporated into the report.
8. BACKGROUND PAPERS
8.1 Economic Growth & Development Services – Appendix 1
Housing and Property Services – Appendix 2
Environmental & Commercial Services – Appendix 3.
Page 37

Page 38

SPMAN-1024035114-1057
APPENDIX 1
ECONOMIC GROWTH & DEVELOPMENT SERVICE PLAN 2025-28
1. Service
Definition:
Economic Growth and Development leads on Economic Growth and Regeneration, Climate Change, Moray Growth Deal and delivers key
regulatory services:
Environmental Health and Trading Standards deliver regulatory services for food safety, health and safety, animal health, private water supply, public
health, private water supplies, housing, landlord registration, community safety, consumer advice, trading standards, safety of goods, petrol licensing, illicit
goods, consumer advice and tobacco sales.
Development Management and Building Standards is responsible for planning and building standards applications/warrants, compliance with planning
conditions, enforcement of breaches of planning control and dangerous buildings, both services aim to be self-financing attracting significant income
through statutory and discretionary fee income.
Economic Growth and Regeneration delivers Business Gateway Service and Community Wealth Building, external funding and manage allocations
including UKSPF, Town Centre Regeneration activities, Business Improvement District, transfer of Museum service, Skills and Moray Council
Employability team.
Strategic Planning and Development is responsible for the Local Development Plan/Supporting guidance, preparation of masterplans, Climate Change
Strategy/ Routemap, Biodiversity Strategy, Just Transition, Conservation Areas and Grants, Town Centre Regeneration, Moray Growth Deal Housing Mix
Delivery projects, Levelling up Funding, Elgin Plan for Neighbourhoods and Developer Obligations.
Corporate Function responsible for Street naming and numbering, Geographical & Information System (GIS).
2. Service
Resources:
90 FTE
Annual Budget 2025/26: Net Revenue £3.539 million
3. What have we identified for improvement in 2025-28? What evidence did we use to identify this improvement?   Please add
benchmark information wherever available and relevant to the improvement.
Develop proposals for future Just Transition Bids Climate Change Strategy 2020-30
Produce one overarching Environmental Health Team Plan Food Safety, Animal Health and Health & Safety Framework
Prepare guidance document for Policy 11 c) in National Planning
Framework 4 to maximise socioeconomic benefit associated with energy
developments and address community wealth building.
National Planning Framework 4, Community Wealth Building Strategy 2025, Highlands and
Islands Regional Economic Partnership (Regional Economic Strategy 2024)
To implement the outcomes of the National Planning Improvement
Framework peer review National Planning Improvement Framework Guidance 2024
Improve communications for members of the public in relation to the Moray
Growth Deal and other regeneration projects in Elgin to ensure wider
appreciation of funding outcomes
Internal Audit Recommendation
Review of Developer Obligations Supplementary Guidance, publish and
consult on revised guidance including review of methodologies.
National Planning Framework 4, Developer Obligations Supplementary
Guidance Moray Local Development Plan 2020 Guidance
Delivery of a joined-up skills planning approach Corporate Plan, Review of focus of Moray Economic Partnership sub group activity, link to
Moray Growth Deal
Note: Progress against BV Actions will be monitored and reporting out with Service Plan process 
Page 38

Page 39

SPMAN-1024035114-1057
APPENDIX 1
ECONOMIC GROWTH & DEVELOPMENT SERVICE PLAN 2025-28
4. Strategic Outcome
or Priority
Action Planned Outcome Outcome measures Completion
target
Lead Priority
Rating
(1 high, 3
low,4 for
ongoing, 5
for on hold)
(L) Developing a diverse,
inclusive & sustainable
economy. (CP) Building
Stronger Greener Vibrant
Economy
Progress Moray
Growth Deal (MGD)
and bring remaining
Moray Growth Deal
projects into delivery. 
By the end of the Deal
(2031): MGD outcomes
relating to GVA uplift,
tourism numbers,
affordable homes built,
job creation and skills
uplift to be achieved.
Milestone(s):
7 of the 8 MGD projects in delivery. 
Business case in progress for the eighth.
MICM Phase 1 operational
(demonstration hub and business
incubator units). EY STEM Phase 1
operational (Elgin STEM Hub, mobile
solution, lending library) Bus revolution
Phase 2  commenced
1 project to have completed (Digital
Health), with the remaining 7 in delivery.
Eighth MGD project (skills and
innovation) to have entered delivery.
Business Enterprise Hub facility to open
(subject to the project entering delivery
by Q1 25/26)
1 project to have been completed with
the remaining 7 in delivery. Elgin Town
Hall to reopen. Bus revolution phase 3 to
commence. Work on MCIM phase 2 to
have commenced (business grow on
space)
March 2026
March 2027
March 2028
Moray Growth
Deal Manager
1
(L) Developing a diverse,
inclusive & sustainable
economy. (CP) Building
Stronger Greener Vibrant
Economy
Delivery of the
Community Wealth
Building Strategy and
Action Plan with a
focus on priority
actions
Ensure wealth stays
within the hands of our
local communities 
Milestone(s):
Introduction of community benefits portal
by March 2026
Regional Socio-economic benefit plan
drafted by March 2026
March 2026 Economic
Growth &
Regeneration
Manager
1
Page 39

Page 40

SPMAN-1024035114-1057
APPENDIX 1
ECONOMIC GROWTH & DEVELOPMENT SERVICE PLAN 2025-28
Planning guidance finalised by March
2026
PI(s):
- (SLAED) Average gross weekly
earnings (full-time employees)
- (SLAED) Proportion of people earning
less than the living wage
(L) Developing a diverse,
inclusive & sustainable
economy. (CP) Building
Stronger Greener Vibrant
Economy
Improve access to fair
work,
employment and
training
opportunities by
delivering a joined-up
Skills Planning
approach
Refine our Skills
Planning approach to
improve the response
of education and
training services to
meet the needs of local
businesses
•
•
•
• •
PI(s):
- 5% Increase in number of females
participating in (all age) apprenticeships at
all levels (Funding dependent – current
waiting list)
- 5% Increase in the number of young
females participating, progressing and
sustaining learning, training and
employment opportunities across the Moray
Pathways Local Employability Partnership
5% Increase the number of young females
entering the workforce via our Sector Based
Work Academy Programme and MERI
scheme (paid job placements)
- Number of MA and Graduate
Apprenticeships in Moray to increase
by  50 (20 via upskilling from existing
employees and 30 via newly created
apprenticeships).
- Increase the number of businesses
engaging with Moray Pathways
Training and FE/HE provision by 10%.
- Increase the proportion of 16–29-year-
olds within Moray by 2% each year
(against NRS Mid-Year2023 data)
- Mapping of current provision and
gaps
March 2026 Employability
Team
Manager/
Moray
Pathways LEP
Lead
1
Page 40

Page 41

SPMAN-1024035114-1057
APPENDIX 1
ECONOMIC GROWTH & DEVELOPMENT SERVICE PLAN 2025-28
(L) Developing a diverse,
inclusive & sustainable
economy. (CP) Building
Stronger Greener Vibrant
Economy
Enable more parents to
work by increasing
availability of affordable
School Aged childcare
provision
Minimise barriers to
people working such as
school aged childcare
provision with initiatives
and policy guidance
being prepared
PI(s):
- (NOMIS) Gender Pay Gap
- (LGBF) % unemployed people assisted
into work from Council operated/funded
employability programmes
- Increase the number of Parents
assisted through Employability
partnership
- Increase the number of School Aged
Childcare places available
- Increase the number of 5–12-year-olds
participating in new SACC provision by
5%
- Increase the number of unemployed
adults and parents progressing, and
sustaining learning, training and
employment opportunities by 10%
March 2026 Employability
Team
Manager/
Moray
Pathways LEP
Lead
1
(L) Developing a diverse,
inclusive & sustainable
economy. (CP) Building
Stronger Greener Vibrant
Economy
Delivery of the
Levelling up Fund
elements of the Elgin
City Masterplan
Elgin City Centre is a
prosperous, attractive
and healthy place
Milestone(s):
Evaluation by March 2027
PI(s):
- (SLAED) Town Vacancy Rates
- No of empty properties and
vacant/derelict sites in the city centre
- No of additional residential properties in
the Elgin city centre
March 2027 Strategic
Planning and
Development
Manager
1
(L) Developing a diverse,
inclusive & sustainable
economy. (CP) Building
Stronger Greener Vibrant
Economy
Delivery of Town
Centre Improvement
Plan & Annual Report
Developing a diverse,
inclusive and
sustainable economy:
By the year 2030 Moray
will have a sustainable
and inclusive economy
which generates
improved opportunities
for everyone, including
more skilled and higher
paid jobs
Town Vacancy Rates SLAED annual
report indicators – town centre vacancy
rates
Ten year
programmes
2035
Strategic
Planning and
Development
Manager
1
Page 41

Page 42

SPMAN-1024035114-1057
APPENDIX 1
ECONOMIC GROWTH & DEVELOPMENT SERVICE PLAN 2025-28
5. Service Level
Outcomes or
Priorities
Action Planned Outcome Outcome Measures Completion
Target
Lead Priority
rating
Economic Growth &
Regeneration
Plan for
neighbourhoods
updated investment
plan – Elgin
Elgin City Centre is a
prosperous, attractive
and healthy place
Milestone(s):
Elgin Town Board Investment Plan by
October 2025
PI(s):
- (SLAED) Town Vacancy Rates
- No of empty properties and
vacant/derelict sites in the city centre
- No of additional residential properties
in Elgin City Centre
Submission to
Government
November 2025
2025
Strategic
Planning &
Development
Manager
1
Economic Growth &
Regeneration
Delivery of the 5-year
Forres Conservation &
Heritage Scheme
Forres Town Centre is
revitalised
Milestones(s):
- Shopfront Appraisal complete
- Vacant Property study complete
- Public realm improvements complete
- Interpretation complete
- 2 Priority Projects complete
- Building Health Check complete
Dec 2025
Dec 2025
June 2026
Sep 2027
Dec 2027
Dec 2028
Economic
Growth &
Regeneration
Manager
1
Economic Growth &
Regeneration
Stage 1 & 2
Development of Moray
Visitor Levy
Scheme proposal
agreed
Milestones(s):
Stage 1 to develop outline proposal by
December 2025
Stage 2 to consult for a period of 12
weeks by April 2026
December 2025
April 2026
Economic
Growth &
Regeneration
Manager
1
Economic Growth &
Regeneration
New operating model
for Forres Museum
Transfer of museum
service
Milestones(s)
- Governance arrangements in place
by March 2026
- 20 Museum open days July-Aug 2026
- Business Plan prepared by February
2027
- Fundraising activity successful by end
of March 2027
March 2026
August 2026
February 2027
March 2027
Economic
Growth &
Regeneration
Manager
4
Page 42

Page 43

SPMAN-1024035114-1057
APPENDIX 1
ECONOMIC GROWTH & DEVELOPMENT SERVICE PLAN 2025-28
Legislative/
Regulatory
Preparation of Moray
Local Development
Plan (LDP)
Proposed LDP to
deliver homes,
employment, prosperity,
town centre
regeneration, active
travel, healthy living,
infrastructure, carbon
reduction, climate
adaptation and
biodiversity
enhancement
In accordance with updated
Development Plan Scheme
December 2027 Strategic
Planning &
Development
Manager
1
Legislative/
Regulatory
Guidance for Policy
11c) in NPF4 to
maximise socio-
economic benefit
associated with energy
developments
Production of guidance
document and
associated plans to
maximise economic
impact and address
community wealth
building and ensure
compliance with Policy
11 c) in NPF4
Milestone(s): 
Consultation complete
Guidance documents and associated
plans complete
Nov 2025
April 2026
Strategic
Planning &
Development
Manager
2
Legislative/
Regulatory
Deliver improvement
plan and outcomes
following the peer
review process for the
Planning Improvement
Framework
Improvement plan for
the planning service
Set out in the annual Improvement plan April 2026 Development
Management
& Building
Standards
Manager &
Strategic
Planning &
Development
Manager
2
Legislative/
Regulatory
Review of Developer
Obligations
Supplementary
Guidance
Ensure Developer
Obligations Guidance is
robust to ensure
collection and spending
of Developer
Obligations.
Milestone(s):
Final guidance prepared by December
2025 
December 2025 Strategic
Planning &
Development
Manager
2
Legislative/
Regulatory
Produce one
overarching
Having an efficient and
focused service
PI(s):
- Improved response times for EH
Performance Indicators
December 2025 Environmental
Health &
Trading
1
Page 43

Page 44

SPMAN-1024035114-1057
APPENDIX 1
ECONOMIC GROWTH & DEVELOPMENT SERVICE PLAN 2025-28
Environmental Health
team plan
delivering on key
statutory requirements
Standards
Manager
Climate Change and
Biodiversity Routemap
to Net Zero
Update Routemap to
net Zero
Creation of Routemap Milestone(s):
Approved Routemap by October 2025
October 2025 Strategic
Planning &
Development
Manager
1
Climate Change and
Biodiversity Routemap
to Net Zero
Update Climate
Change Strategy
Achievement of targets,
indicators and
outcomes identified in
Climate Change Action
Plan to achieve carbon
neutrality
Milestone(s):
Draft Strategy
Public consultation on Draft Strategy
Final Climate Change Strategy
-
August 2025
October 2025
Dec 2025
Strategic
Planning &
Development
Manager
1
Climate Change and
Biodiversity Routemap
to Net Zero
Produce a Biodiversity
Strategy
Creation of Strategy Milestone(s): Approved draft strategy
and subsequent metrics for actions to
be agreed by August 2025
August 2025 Strategic
Planning &
Development
Manager
1
Climate Change and
Biodiversity Routemap
to Net Zero
Develop a Masterplan
to inform future
submissions of Just
Transition Bids
Creation of Just
Transition Strategy
Milestone(s): Approved Strategy and
subsequent metrics for actions to be
agreed 
August 2025 Strategic
Planning &
Development
Manager
1
Workforce Planning Identify route for
succession of
professional officers
across the service
Reduces risk of
statutory failures
impacting on the
delivery of the service
Reduce number of services at risk of
insufficient staffing levels in next 5
years for the whole service
March 2026 H/EGD 1
Health and Wellbeing Ensure revised
operational
implementation of
absence management
procedures are applied
by managers
Absence is managed
effectively, and levels of
absence are reduced
efficiently and timeously
Reduction in number of days absence
per employee
PI(s):
Sickness absence days lost per FTE
March 2026 Service
Managers /
H/EGD
2
Page 44

Page 45

SPMAN-1024035114-1079
APPENDIX 2
HOUSING AND PROPERTY SERVICE PLAN 2025-28
1. Service Definition:  Management and maintenance of Council housing stock
 Local strategic housing function
 Statutory duties in relation to homelessness and fuel poverty
 Development and delivery of the Moray Affordable Housing Supply Programme (AHSP)
 Maintenance of the Council’s corporate buildings, management of the Council’s corporate property portfolio and the industrial estate
 Building Service DLO
 Property Design
 Asset Management and Estates function.
2.Service Resources: FTE: 344 employees
Total Annual Budget 2025-26: £60.7m
 Housing Revenue Account: £28.8m
 Building Services: £19.8m
 General Services Housing & Property: £12.1m
3.What have we identified for improvement in 2025-28 What evidence did we use to identify this improvement?
Please add benchmark information wherever available and relevant to the
improvement.
Systemic Review of Quality and Customer Service for
Housing Repairs
Informed by volume of tenant and elected member representations and complaints.
Comprehensive review of data including complaints to inform a systemic action plan for
improvement in terms of quality, value for money and customer satisfaction.
Review of gas servicing scheduling systems Existing ICT is unsupported. Potential to replace it with a more robust, supported and
integrated system, which will schedule works and satisfy statutory reporting requirements.
Local Housing Strategy 2025-30 Alignment with IJB with development of the Strategic Commissioning Plan which must include
a Housing Contribution Statement. The statement will be informed by the HNDA undertaken in
2023/24.
Improve attainment of EESSH (Energy Efficiency
Standard for Social Housing) and SHQS (Scottish
Housing Quality Standard)
Scottish Housing Regulator and benchmarking data – Moray Council remains below local
authority averages.
Reducing the number of children in temporary accommodation and the
duration of homelessness for families
Scottish Government homelessness data and reports on the impact on children – Moray
Council performs well against local authority comparators and is striving for best practice.
4.Strategic
Outcome or
Priority
Action Planned Outcome Outcome
measures
Completion
target
Lead Priority
Rating
Page 45

Page 46

SPMAN-1024035114-1079
APPENDIX 2
HOUSING AND PROPERTY SERVICE PLAN 2025-28
(1 high 3 low and
4 for ongoing, 5
for on hold)
(L) Empowering &
connecting
communities.
(CP) Building
Thriving,
Resilient,
Empowered
Communities
Delivery of the Housing,
Investment and Affordable
Housing Supply programmes
Increase in affordable
housing available in Moray
PIs
H1.10a Number of
affordable housing
completions at end
of current FY
91 completions
36 site starts
31 March 2028
31 March 2026
31 March 2026
Housing
Strategy
&
Development
Manager 1
(L) Building a
better future for
our children &
young people.
(CP) Tackle
Poverty and
Inequality
Reducing the number of
children in temporary
accommodation, the duration
of homelessness for families
and the impact of
homelessness on children
Prevention of
homelessness or rapid
rehousing for families
threatened with
homelessness
Number of children
in temporary
accommodation
reduced by 5%
Number of
homeless
presentations from
families with
children
Instances of
homeless
prevention
Duration of
homelessness for
families with
children reduced by
5%
31 March 2026
and annually
against 2024
baseline
Housing
Needs
Manager
2
Page 46

Page 47

SPMAN-1024035114-1079
APPENDIX 2
HOUSING AND PROPERTY SERVICE PLAN 2025-28
Educational
Attendance &
Attainment for
children impacted
by homelessness
(CP) Strategic
Framework:
Financial,
Workforce, Digital,
Transformation
Strategies. 
Performance
Management
Framework
Review of Depot & Stores Improvement and
rationalisation of estate
Per FBC PIs
Milestones
1. Approval of Full
Business Case
2. Development of
Implementation
Plan
31 March 2028
30 June 2025
31 Dec 2025
Property Asset
Manager
1
5. Service
Level
Outcomes or
Priorities
Action Planned
Outcome
Outcome Measures Completion Target Lead Priority
rating
Systemic
Review of
Housing
Repairs
Implementation of Repairs
Improvement Plan
Increased
customer
satisfaction and
value for money
assurance
Value for
money
assurance 
Milestones/PIs
1. Increase the
proportion of repairs
completed correctly
the first time by 5%
2. Level of Complaints
decrease by 10%
3. Response Repair
expenditure reduced
by 10%,
PIs
1. 30 June 2025
2. 31 March 2026
3. 31 March 2026
Building Services
Manager
1
Page 47

Page 48

SPMAN-1024035114-1079
APPENDIX 2
HOUSING AND PROPERTY SERVICE PLAN 2025-28
H1.8 No of Complaints
Received
H1.8a Number of
Complaints Closed
H1.8b Number of
complaints received
relating to
Repairs/Capital/Planned
Maintenance
H1.8c % of complaints
closed relating to
Repairs/Capital/Planned
Maintenance
H2.7 Average length of
time (hours) to complete
emergency repairs
H2.8 Average length of
time (working days) to
complete non-emergency
repairs (Quarterly)
H2.11 % of repairs
completed right first time
H2.12 % of repairs
appointments kept
H2.15 Response repair
expenditure
Page 48

Page 49

SPMAN-1024035114-1079
APPENDIX 2
HOUSING AND PROPERTY SERVICE PLAN 2025-28
HSN04b Average number
of days taken to complete
non-emergency repairs
Housing Needs Revise the Housing Contribution
Statement with Health & Social
Care Moray
Achieve strategic alignment of
allocations, operations and
Development between the
Council and IJB
Assess and
respond to the
housing needs
of older people,
in partnership
with IJB 
31 Dec 2025
31 Mar 2026
Housing Strategy
& Development
Manager/Housing
Needs Manager
1
Energy
Efficiency &
housing quality
within building
and housing
stock
Continue to improve the
Council’s housing stock and
reduce the carbon impact
arising from Housing & Property
Services
Phased
improvement of
Council
housing and
energy
efficiency within
corporate
buildings and
housing stock
to be carbon
neutral by 2030
Milestones/PIs
1. A reduction in Scope 1
(direct emissions
arising from energy
Consumption in
relation to the
corporate estate) of
10% against 21/22
baseline of 5,615
tonnes of CO2,
2. Increase % of houses
meeting EESSH (To
meet LGBF Family
Group Average)
PIs
HSN03 Proportion of
council dwellings meeting
Scottish Housing Quality
Standards.
31 March 2026 Property Asset
Manager
2
Page 49

Page 50

SPMAN-1024035114-1079
APPENDIX 2
HOUSING AND PROPERTY SERVICE PLAN 2025-28
HSN05a Proportion of
Council dwellings that are
energy efficient
H1.20 Direct emissions
arising from energy
consumption on the
corporate estate (tonnes
CO2e)
H2.2b Percentage of stock
meeting the Energy
Efficiency Standard for
Social Housing (EESSH)
Gas Service
Scheduling
System
1. Complete option appraisal
for improvements
2. Develop implementation
plan for identified solution
Provision of a
robust,
supported and
integrated
system, which
will schedule
works efficiently
and satisfy
statutory
reporting
requirements.
Value for
money
PIs
H2.13a Number of times
did not meet statutory
obligations to complete a
gas safety check within 12
months of a gas appliance
being fitted or its last
check – target is zero
instances.
H2.16 Percentage of
properties compliant with
current Gas Regulations
(holding a valid Landlord
Gas Safety Record) –
target is 100%.
H2.19 Percentage of
service records kept to
1. 30 Sep 2025
2. 31 March 2026
Building Services
Manager/ Housing
Strategy &
Development
Manager
1
Page 50

Page 51

SPMAN-1024035114-1079
APPENDIX 2
HOUSING AND PROPERTY SERVICE PLAN 2025-28
Gas Safe Register
acceptable standards.
H2.20 Percentage of
services carried out to
Gas Safe Register
standards of satisfactory
workmanship.
Review of
Teams
1. Review of interdependencies
and changes to be incorporated
(aligned with corporate structure
changes).
2. Review of Refugee
Resettlement Team
Efficiency of
service delivery
£75K savings
Implementation
of the Change
Management
Plan to absorb
Refugee
Resettlement
Team within
Housing &
Property
Services
Milestones
Review of relevant roles
(Action 1)
Implementation of
proposals (Action 1)
Inclusion in Scheme of
Delegation & Scheme of
Administration (Action 2)
Implementation of Staffing
Changes (Action 2)
1. 31 Dec 2025
2. 30 Jun 2025
3. 30 Sep 2025
Head of Housing
& Property
Services
Housing Needs
Manager/Housing
Strategy &
Development
Manager
2
Workforce
Health &
Wellbeing
Ensure revised operational
implementation of absence
management procedures are
applied by managers
Absence is
managed
effectively and
levels of
absence are
reduced
efficiently and
timeously. 
PIs
H&P1.0 Sickness absence
days lost (Service) FTE
H&P
H&P1.1 % of Sickness
absence (Service) H&P
31 March 2026 Head of Housing
& Property
Services
2
Page 51

Page 52

SPMAN-1024035114-1079
APPENDIX 2
HOUSING AND PROPERTY SERVICE PLAN 2025-28
Page 52

Page 53

SPMAN-1024035114-1067
APPENDIX 3
ENVIRONMENTAL AND COMMERCIAL SERVICES SERVICE PLAN 2025-28
1. Service
Definition:
Environmental and Commercial Services is a diverse service with twenty-one discrete functions delivered by four services: -
Roads Maintenance deliver management and maintenance of public roads, winter maintenance, street lighting, fleet services.
Environmental Protection manage and maintain all parks, open spaces, core paths, countryside ranger service, amenity areas
and burial grounds waste/recycling collection, waste disposal, street cleaning, school meal service, building cleaning and janitorial
service for council buildings.
Transportation has responsibility for the management of all traffic and road safety functions, street works co-ordination, active
and sustainable travel, transport planning and strategies, off-street car parks, public transport unit PTU, and includes maintenance
and operation of 6 harbours including a dredger.
Consultancy provides civil engineering construction related services including bridge management, road design, contract
management and flood risk
2. Service
Resources:
Annual Budget 2025/26 Capital £12,340,000 Revenue £28,624,410
Total 639.11 FTE (Roads Maintenance 131.2FTE, Environmental Protection 415.97FTE, Transportation 75.94FTE, Consultancy
13FTE, DIRECT 3FTE)
3. What have we identified for improvement in 2025-28? What evidence did we use to identify this improvement?
Please add benchmark information wherever available and relevant to
the improvement.
Promote and develop our approach to decarbonising Moray’s roads
Review our winter service operational plan to promote and develop
decarbonisation opportunities.
Deliver improved compliance and efficiencies within Fleet services
Climate Change Strategy 2020-2030
Flood Risk Management Statutory requirements on Surface Water Management Plans and Coastal
Adaptation
Further promote and develop sustainable travel Active Travel Strategy 2022-2027, Climate Change Strategy 2020-2030, National
Transport Strategy 2
Promote Buckie Harbour for further growth and development Just Transition programme, Buckie Harbour Masterplan (draft)
Improve burials operations and infrastructure Requirements of Burial and Cremation (Scotland) Act 2026 which will come into force from
March 2025 or March 2026. 
Note: Progress against BV Actions will be monitored and reporting out with Service Plan process
Page 53

Page 54

SPMAN-1024035114-1067
APPENDIX 3
ENVIRONMENTAL AND COMMERCIAL SERVICES SERVICE PLAN 2025-28
4. Strategic
Outcome or
Priority
Action Planned Outcome Outcome measures Completion
target
Lead Priority
Rating
(1 high, 3 low, 4 for
ongoing, 5 for on
hold)
(L) Developing a
diverse, inclusive
& sustainable
economy. (CP)
Building Stronger
Greener Vibrant
Economy
Progress the Bus
Revolution m.connect
project as part of
delivering the Moray
Growth Deal.
In line with corporate plan
outcomes of retain and
attract young people,
minimise barriers to
working, adapt to changing
climate and acts
sustainably
Increase passenger journeys on
m.connect by 4,286p.a.
To reduce the environmental
impact of transport in the area by
4.3t CO2e p.a.
Milestones:
Vehicles delivered/in service,
training complete, service
registrations submitted and listed,
marketing launched, operational
systems deployed
Phase 2 launched.
Group booking function released
Annual
Annual
April 2025
May 2025
Sept 2025
NM/Strategic
Transport
Services
Manager
4
Page 54

Page 55

SPMAN-1024035114-1067
APPENDIX 3
ENVIRONMENTAL AND COMMERCIAL SERVICES SERVICE PLAN 2025-28
5. Service Level
Outcomes or
Priorities
Action Planned Outcome Outcome Measures Completion
Target
Lead Priority
rating
Asset Management Identify and collate all
retaining walls
A full list of Moray Council’s
retaining walls with visual
inspection of condition and
recommendations for action
required
Asset Management Plan for Moray
Council’s retaining walls 
April 2026 Consultancy
Manager
2
Asset Management Develop a prioritisation
method for non-network
bridges
Non-network bridge
maintenance prioritisation
methodology.
Non-network bridge maintenance
prioritisation policy enabling clear
spend priorities for available
budget
Dec 2026 Consultancy
Manager
2
Asset Management Improve the rate of
Principal Inspections
undertaken on the
Council's network
bridges by reassigning
this work as a top priority.
Principal Inspections rate
complies with legislation (each
network bridge to be inspected
every six years) and Moray
improves the inspection rate to
a similar standard to other Local
Authorities
64 Principal Inspections will be
undertaken each year with
benchmarked improvement in
bridge condition (data currently
reported to Society of Chief
Officers of Transportation Scotland
(SCOTS) - will be added to
performance reports when
available)
Dec 2025 with
progress to be
measured
annually
Consultancy
Manager
2
Asset Management Develop a Tree Strategy
which will direct how the
Council manages its
living assets in Parks
and Open Spaces.
Commence risk-based
tree condition surveys at
prioritised locations
Improved tree management
Improved health and safety on
Council owned Parks and Open
Spaces
Costed process for undertaking
tree/surveys works which then
require budget approval
At least two Parks and Open
Spaces assessed per year
following budget approval. 
March 2026 Environmental
Protection
Manager
2
Asset Management Creation of a new
cemetery at Linkwood
Road, Elgin
Increasing the vacant lair
capacity for future use within
Moray cemeteries
Availability of additional burial
capacity from 2026
Milestones:
March 2026
March 2025
Environmental
Protection
Manager
1
Page 55

Page 56

SPMAN-1024035114-1067
APPENDIX 3
ENVIRONMENTAL AND COMMERCIAL SERVICES SERVICE PLAN 2025-28
Produce and publish tender for the
scope of works needed to
construct a new cemetery
Appoint successful to contractor to
construct the new cemetery
Completion of construction of
cemetery
March/April
2025
Sept 2025
Climate Change Develop a strategy
facilitating transition to
the use of low carbon
materials on our road
network.
Identify & trial low carbon
materials that can be used to
repair our road network.
Review the cost of trial materials v
carbon savings and aim to achieve
5% of planned pothole repairs
utilising low carbon materials
Milestones:
Identify available low carbon
materials to be used
Undertake trials of low carbon
materials.
Evaluate supply chain costs v
carbon savings v operational
performance
Develop a strategy to decarbonise
our road network (outlining
opportunities and barriers).
March 2026
June 2025
Dec 2025
March 2026
March 2027
Roads
Maintenance
Manager
2
Climate Change Review our winter
service operational plan.
Improved service delivery and
compliance with regulatory
measures
Aim to reduce salt usage by 3%.
Milestones:
Review current routes and
undertake route optimisation
Review vehicle/plant & material to
facilitate lower carbon emissions.
March 2026
August 2025
August 2025
Roads
Maintenance
Manager
1
Page 56

Page 57

SPMAN-1024035114-1067
APPENDIX 3
ENVIRONMENTAL AND COMMERCIAL SERVICES SERVICE PLAN 2025-28
Update the Winter Service
Operational Plan
October 2025
Climate Change Implement strategy for
public use of On and Off
Street (car parks)
charging infrastructure
via Pathfinder Project
Community Wealth Building,
Community Benefits and
Economic Social Governance
including training and the
development of local supply
chains for repairs and servicing
Continue Pathfinder Project with
A/Shire, Aberdeen City and
Highland Councils to seek private
investment to expand and operate
publicly available Electric Vehicle
Charging Infrastructure in Moray.
Milestones:
- Tender process to appoint
partner - complete
- Contract Awarded
- Implement strategy
April 2025
May 2025
Dec 2028
Strategic
Transport
Services
Manager
2
Climate Change Delivery of Active Travel
Strategy - Promote and
develop active and green
travel in schools
Increased awareness and
participation in active and green
travel in schools
- 52-54% of all journeys to school
walked, wheeled or cycled
- 95% of primary schools will
deliver L2 Bikeability by 2027
- 60% of all journeys to school to
be walked, wheeled or cycled by
2027.
June 2025
March 2027
March 2027
Strategic
Transport
Services
Manager
4
Climate Change Develop Surface Water
Management Plans
(SWMP) for Forres and
Findhorn by end 2026/27
Implementing surface water
infrastructure improvements in
vulnerable flood risk areas:
Reducing the risk of surface
water flooding to properties in
vulnerable areas
Draft SWMP for Forres & Findhorn
Implementing surface water
infrastructure improvements in
vulnerable flood risk areas: (levels
of risk and areas to be identified in
surface water management plans)
New schemes prioritised in Local
Flood Risk Management Plans for
2022 – 2028 will reduce risk to
March 2027
TBC following
completion of
plans
Consultancy 2
Page 57

Page 58

SPMAN-1024035114-1067
APPENDIX 3
ENVIRONMENTAL AND COMMERCIAL SERVICES SERVICE PLAN 2025-28
approximately 100 properties in
Moray)
Climate Change Deliver Coastal Adaption
Plan Interim Report to
coincide with the Local
Flood Risk Management
Interim Reports
A plan to manage Moray’s
coastline that is adaptable to
climate change.
Supporting management of
Moray’s Coastline in a sustainable
way.
Dec 2025 Consultancy
Manager
2
Compliance &
Efficiency
Create a burials
administration service to
support the burial service
and meet requirements
of the Burial and
Cremation (Scotland) Act
Improved service delivery and
compliance with regulatory
measures
Meet the requirements of the
Burial and Cremation (Scotland)
Act.
Milestones:
- Service health check and
knowledge-based documents
prepared by registrars
- Understand implications of the
Burial and Cremation Act on
burial administration functions
- Review and recommend
appropriate system for
management of burials  
March 2026
April 2025
April 2025
Nov 2025
Environmental
Protection
Manager
2
Compliance &
Efficiency
Improve efficiency of the
Pool Car scheme;
reducing costs,
increasing customer
satisfaction and ensuring
Net Zero aspirations are
met
Undertake an options appraisal
review to develop a best value
solution that meets the
objectives of the project
- Business Case to ECLT
- 5% Reduction in grey fleet
mileage claimed by council staff
- 5% increase in total milage of
pool cars by council staff by
March 2026
- Increase total average mileage
of a pool car from 10,000 miles
to 12,000 miles
June 2026
March 2026
March 2026
March 2027
Roads
Maintenance
Manager
1
Page 58

Page 59

SPMAN-1024035114-1067
APPENDIX 3
ENVIRONMENTAL AND COMMERCIAL SERVICES SERVICE PLAN 2025-28
Compliance &
Efficiency
Barcode / QR coded
scanning introduced into
stores processes.
Improved efficiency & accuracy Tranman stores system upgrade to
include scanning system
Sept 2025 Fleet Services
Manager
2/3
Compliance &
Efficiency
Undertake a staff led self
-assessment of our
service activities and
customer results using
the PSIF model (Public
Service Improvement
Framework)
Results from self-assessments
will be used to create a targeted
action plan for long term
improvements to the section
PSIF for 2 Service Areas complete
(Waste Services and 1 Other
TBC).  Process for each service
includes:
- Survey
- Workshops
- Action Plan Prepared
March 2026 Service
Managers
2
Growth Publish Harbour
Masterplan
Promote development
opportunities to potential
partners and attract inward
investment
Publication of Masterplan and
feasibility studies 
Sept 2025 Strategic
Transport
Services
Manager
2
Maximising
Opportunities
Lead the transport
element of the Town
Centre Improvement
Plan
Developing a diverse, inclusive
and sustainable economy: By
the year 2030 Moray will have a
sustainable and inclusive
economy which generates
improved opportunities for
everyone, including more skilled
and higher paid jobs
Transport interventions on track for
delivery as per programme (still to
be agreed and subject to funding):
- Active Travel Masterplans to be
complete (2 per year) by 2030
(33% complete by March 2026)
- Additional cycle parking (where
identified as a need by the
community) by 2030 (50%
complete by March 2026)
- EV charging subject to third
party timescales but by 2028
(end of EVIF Grant period)
- Ebike charging to be provided by
and subject to third party
timescales (Council support
only)
As per agreed
programme.
Strategic
Transport
Services
Manager
1
Maximising
Opportunities
Lead the infrastructure
elements of the Levelling
Up Fund in line with
Elgin City Masterplan
Elgin City Centre is a
prosperous, attractive and
healthy place
Number of infrastructure schemes
on target for planned delivery
(programme still TBC – indicators
to be revised following
confirmation)
March 2027 Consultancy
Manager
1
Page 59

Page 60

SPMAN-1024035114-1067
APPENDIX 3
ENVIRONMENTAL AND COMMERCIAL SERVICES SERVICE PLAN 2025-28
Health and
Wellbeing
Ensure revised
operational
implementation of
absence management
procedures are applied
by managers
Absence is managed effectively,
and levels of absence are
reduced efficiently and
timeously
Reduction in number of days
absence per employee 
March 2026 Service
Managers
2
Page 60

Page 61

Report
to:
Economic
Development and
Infrastructure
Services Committee
Meeting
Date:
17 June 2025      
Report
by:
Depute Chief
Executive (Economy,
Environment and
Finance)
Report No: ECS012/25/NM      
Author: Nicola Moss Contact
Email:
nicola.moss@moray.gov.uk 
Subject: Buckie Harbour Masterplan 
1. PURPOSE 
☒ For Decision      ☐  For Information 
1.1 The purpose of this report is to inform the Committee of the development of a new
masterplan for Buckie Harbour.  
1.2 This report is submitted to Committee in terms of Section II (F) (25) of the
Council's Scheme of Administration relating to the Council’s role as Harbour
Authority. 
2. SUMMARY  
2.1 The Buckie Harbour Masterplan recognises the recent developments and growth
in Buckie Harbour and sets out a series of options for viable growth and
development of the Harbour. 
3. RECOMMENDATIONS  
3.1 It is recommended that Committee:   
i) note the information in the report regarding the background and
purpose of the Masterplan as a tool to set out the long term aspirations
relating to development of Buckie Harbour; and 
ii) approve the Masterplan for a 4 week public consultation, delegating
Item 8.
Page 61

Page 62

authority to the Chair of this Committee and the Head of Environmental
& Commercial Services to finalise the document for publication.   
Nicola Moss
Head of Environmental and Commercial Services 
4. BACKGROUND AND CONTEXT  
4.1 The Council published a Masterplan for Buckie Harbour in 2015 (Para 15 of the
minute to this Committee on 10 February 2015 refers) setting out the opportunities
for inward investment in the harbour, in particular positioning the harbour as an
ideal location for an operations and maintenance base for Offshore Wind.  
4.2 In the time following the publication of that Masterplan, there were discussions and
negotiations which led to a medium term lease of property in the harbour by SSE
Renewables, and more recently the leasing of land and occupation of parts of the
harbour by Ocean Wind as the Operations & Maintenance base for the Moray
West offshore windfarm. These have constituted welcome and material
commercial growth for the harbour, with wider economic benefit for Moray and the
North East of Scotland.  
4.3 It remains the case that there are opportunities for enhanced use and growth at
Buckie Harbour without losing the core mixed use harbour providing services for
fishing, cargo, boatbuilding, offshore wind and more. However, if substantial
growth is to be achieved to meet the future demands, particularly from the energy
sector, then additional capacity will be required. This is a position replicated
around Scotland’s coastline with diminishing capacity for growth in ports. 
4.4  To best reflect the opportunities for Buckie Harbour, a further Masterplan for
Buckie Harbour was commissioned by the Council and Highlands & Islands
Enterprise in 2022. This work was quickly supplemented by the Just Transition
funding the Council received which enabled the commissioning of a feasibility
study for harbour expansion. 
4.5 This report sets out a consolidated Masterplan, attached as Appendix 1 which
draws together the elements of both of these studies and sets out a vision for
future growth. The Masterplan has been developed in consultation with existing
harbour users and stakeholders. The Masterplan is supplemented by additional
detailed information which will be held for detailed discussion with interested
parties. 
4.6 This Masterplan is not intended to form a case for internal investment, but rather to
set out the opportunities that are offered by Buckie, and how there is a viable route
to expansion and growth with appropriate funding packages. These would all be
subject to development and approval should the opportunities emerge. However,
without a ‘blueprint’ for growth there is no catalyst for future change. 
5. PROPOSALS  
Page 62

Page 63

5.1 The new Masterplan aims to strike a balance with harbour and landside
development opportunities to meet the future needs of Offshore Wind, Onshore
Wind, Fishing, Cargo, Shipbuilding and Training Providers.  
5.2 It sets out the opportunities that exist in the marine sector going forward, and how
Buckie Harbour is ideally situated to accommodate these opportunities both with
the landside development opportunities, and the potential for the harbour to be
expanded to meet the growth, particularly in renewable energy production. The
masterplan sets out that these opportunities can be harnessed without detriment to
existing harbour activity, and indeed expansion of the harbour would also provide
enhanced facilities for cargo and fishing. 
5.3 The document is structured such that it gives: 
• An overview of the existing harbour
• An analysis of current and future markets
• Development Opportunities – both landward and seaward
• Proposals and Options 
5.4 Of the proposals and options, the feasibility study, funded by the Just Transition
Fund has demonstrated that westward expansion of the harbour, and upgrade and
re-ordering of Basin 4 both present viable growth opportunities, and the key
elements of these options in terms of design and layout are presented in the
Masterplan, with the underpinning technical studies being separately available.
Development work has also been undertaken in relation to an expansion to the
north-east of the harbour. This is referenced in the Masterplan, with the detail being
separately available as the westward expansion presents the better balance in
terms of cost at this point in time.  
5.5 Throughout the development of the Masterplan there has been consultation and
engagement with stakeholders and Buckie community representatives, with direct
contact and questionnaires and discussion at the Harbour User Group.  
5.6 The following options have all been subject to development and appraisal:
- Westward expansion of the harbour, 425m of quay length (17,250m2), heavy
lift capability, dredged to 6m below chart datum, 41,500m2 of laydown for
components and cargos
- Westward expansion of the harbour, 340m of quay length (16,100m2),
dredged to 4m below chart datum, 10,150m2 of laydown for cargos
- Westward expansion of the harbour, 445m of quay length (17,250m2),
dredged to 6m below chart datum, 13,750m2 of laydown facility for cargos
- Northern expansion of the harbour, 1,040m of quay length (31,750m2),
heavy lift capability, dredged to 9m below chart datum, 84,000m2 of laydown
facility for components and cargos
- Reordering and capacity creation in Basin 4, including enhanced quayside
facility and HGV turning
- North Pier enhancements 
In all instances it is suggested that the reordering and capacity creation in Basin 4
is incorporated as part of any future proposals, however, this is subject to
Page 63

Page 64

discussion and refinement of any firm proposal and appraisal.  
5.7 Benefits of options: 
West
Expansion
-4mCD
West
Expansion
-6mCD
West
Expansion
-6mCD
enhanced
laydown
North
Expansion
Heavy Lift
Capability    
Offshore Trew
Transfer Vessels    
Offshore Service
Operation
Vessels 
Enhanced
Fishing Vessel
capacity    
Enhanced Cargo
Vessel capacity    
Cruise vessel
capacity    
Component
handling     
5.8 Of particular note in terms of future market growth is the ScotWind leasing process,
whereby Crown Estate Scotland have leased seabed rights to developers enabling
over 30GW of new generating capacity to be built over the next decade. Options
have been awarded for 19 sites. The most proximate is the 2GW Caledonia site,
which has been awarded to Ocean Winds, planned to be operational in 2030.
Whilst Ocean Winds have provided some capacity for Caledonia in their existing
arrangements in Buckie Harbour, the size of the site and the move towards the use
of Service Operation Vessels (SOVs) which are much larger and deeper vessels
creates opportunities for Buckie if capacity can be provided.  
5.9 Onshore Wind continues to be part of the energy production portfolio for Scotland,
and the logistics (and costs) of moving large and heavy components as abnormal
loads presents opportunities for ports which are closer to onshore windfarm sites.
There has been interest in Buckie from prospective windfarm operators, however,
the historic smaller size of Buckie Harbour (vessel width and length constraints as
well as depth) means that there are limitations on the components that can be
brought in through Buckie Harbour.  
5.10 There is growing interest in the Moray Firth from the cruise sector, which can
Page 64

Page 65

currently only be accommodated at Buckie harbour by use of tender vessels to
transfer passengers from anchorage in the Firth. Provision of longer quays and
greater depth would enable a range of cruise ships to come directly into harbour.  
5.11 Through the continued engagement with different harbour related sectors,
Highlands & Islands Enterprise and Scottish Government, should funding
opportunities for harbour development / expansion emerge then these will be
brought back to committee for consideration. Further opportunities to market the
opportunities presented by the harbour will continue to be explored.  
5.12 Smaller scale developments that emerge (particularly landside) will either be
progressed within existing delegated authorities or brought to committee for
consideration.  
5.13 It is proposed that subject to approval by this committee the draft Masterplan is
consulted with harbour and industry stakeholders for a 4 week period. This
consultation will include members of the Buckie Harbour Advisory Committee
(which includes community representatives), local businesses, and renewable
sector representatives. It is further recommended that delegated authority is
granted to the Chair of this Committee and the Head of Environmental &
Commercial Services to finalise the document for publication provided that there
are no substantial changes to the content of the Masterplan. 
6. SUMMARY OF IMPLICATIONS  
6.1 The table below shows whether risks and implications apply if the
recommendations are agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement
Plan)
x 
Policy and Legal x 
Financial  x
Risk  x
Staffing  x
Best Value and Transformation  x
Property  x
Information Communications Technology/Digital            x
Equalities. Social Inclusion and Economic Impact          x 
Climate Change, Biodiversity and Sustainability        x 
6.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP))
Improved Collaborative Leadership, as part of continuous improvement through
Best Value, will better enable the Council to fulfil the ambitions set out in its
strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and
Page 65

Page 66

contribute to improved outcomes for communities as outlined in the following
Council Plan strategic priorities:
☐ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report
support and contribute to improved outcomes for communities as outlined in
the following local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in  
Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population 
6.3 Policy and Legal 
A harbour masterplan has no specific legal status, however, it has been
developed mindful of council policies, and in recognition of the council’s role as a
statutory harbour authority, with the view to creating long term commercial
stability for the harbour authority.  
6.4 Financial 
There are no direct financial implications arising from this report. The Masterplan
sets out options and prospects for attracting inward investment to Buckie Harbour
with a view to enhancing the commercial prospects of the harbour and benefitting
the economy of Moray. 
In terms of costs, market conditions will determine final cost, but current
estimates for the main options are as follows:
North Expansion     £497m
West Expansion with enhanced laydown  £350m
West Expansion 6m below chart datum  £220m 
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend
this Year
Virement
From
Other
Comments       
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments      
Page 66

Page 67

6.5 Risk 
There are no direct actions creating risk from the publication of a Masterplan, and
any future decisions and actions will be brought forward to committee setting out
the respective opportunities and risks. 
6.6 Staffing 
No direct staffing implications from this report, however, it should be noted that
harnessing the commercial opportunities requires a level of resource to deliver.
There are proposals in the management restructure that are geared towards this
focus on the development of the council’s harbours.  
6.7 Best Value and Transformation 
None.  
6.8 Property 
There are no direct property implications arising from the report, however, the
Masterplan has been developed in cognisance of the Council’s property portfolio
and in collaboration with the Council’s Property Asset Management team.  
6.9 Information Communications/Technology/Digital 
None.  
6.10 Equalities, Social Inclusion and Economic Impact 
There are no equalities implications arising from this report. Sustainable and
funded growth and development of Buckie Harbour will enhance the socio-
economic position of Moray.  
6.11 Climate Change and Biodiversity Impacts 
Development of Buckie Harbour to facilitate offshore and land based energy
production, amongst other commercial activity is part of a just transition to a net-
zero economy.  
7. CONSULTATION  
7.1 This report has been prepared in consultation with the Depute Chief Executive
(Economy, Environment and Finance), Head of Environmental and Commercial
Services, Chief Financial Officer, HR Manager, Legal Services Manager, Equal
Opportunities Officer, Strategic Planning and Development Manager, Property
Asset Manager, Principal Climate Change Officer and Committee Services
Officer (C O’Connor) and any comments made have been considered and
incorporated into the report where appropriate.  
8. BACKGROUND PAPERS  
8.1 Buckie Harbour Masterplan – Report to ED&I Committee 10.2.15 (confidential
item). 
Page 67

Page 68

Buckie Harbour
Masterplan
APPENDIX 1
Page 68

Page 69

Contents
Foreword 01
Scope 03
Buckie Then 04
Our wave to the history of Buckie Harbour 05
Buckie Now 06
Skills and Personnel 08
Transport and Infrastructure 08
Harbour Development  10
Offshore Wind  10
Fishing 11
Cargo 12
Shipbuilding 14
GWO Training 17
Tourism  17
Emerging Markets  18
Harnessing Opportunities 19
Development Opportunities 20
Renewable and Green Energy  20
Tourism and Cruise Vessels  20
GWO Training  20
Green Energy  21
Proposals 22
Northern Expansion  22
Western Expansion 24
Basin 4 Upgrade 26ii
Page 69

Page 70

Foreword
Buckie Harbour, on the southern side of the Moray Firth has a rich
maritime history that is continually evolving.
Over the years, this vital harbour has served as a vibrant
hub for many industries. Home to thriving cargo operations,
manufacturing, and ship repair industry. The harbour also has a
strong fishing heritage, and serves as a base for marine services,
providing berthing, repair, and maintenance support to a range of
commercial vessels.
As the offshore industry has evolved, Buckie Harbour has extended
its reach to serve the industry, providing essential services,
particularly around offshore wind operations and maintenance
(O&M).
That journey continues by embracing development, supporting our
local industries that have underpinned the harbour and local area
for over 100 years.
Buckie is evolving, growing, and becoming a major support
facility for the renewables sector, while retaining its seafaring
heritage, and supporting the regional economy. Moray Council and
Highlands and Islands Enterprise commissioned this masterplan
to set out that journey.
Cllr Marc Macrae
Chair of Economic Development and Infrastructure Services
01
Page 70

Page 71

02
Page 71

Page 72

Scope
This Masterplan aims to be a high-level
strategic spatial development guidance
document for future change within the harbour
area. It aims to promote the competitive
advantage of the facility for existing and
potential future users, while providing the
rationale that underpins infrastructure and
investment decisions.
This new Buckie Harbour Masterplan is to
be considered a source of information for
potential development opportunities and
follows consultation with key existing and
potential stakeholders. Their needs and
aspirations give a balanced guide for positive
development of Buckie Harbour for all users,
existing and new.
The driving and guiding force throughout the
Masterplan update has been the input of the
harbour stakeholders. Consultation with them
has provided a key insight into current and
future operations from both the traditional
harbour, commercial and renewables sectors. 
03
Page 72

Page 73

Buckie Then
04
Page 73

Page 74

Our wave to the history of
Buckie Harbour
1877
Cluny Harbour built in Buckie by the
Cluny family at a cost of £60,000 –
replacing the earlier harbour to the
west (now known as Buckpool)
1913
Buckie harbour is
home to the largest
steam drifter fleet in
Scotland
1950s
Charles Eckersley, fish merchant,
establishes a seafood processing
business in Buckie – seafood,
particularly smoked salmon, is still
a key part of the local economy
1971
Training schooner
“Captain Scott” built at
the Herd and McKenzie
shipyard. The vessel
is still in service, now
with the Royal Navy of
Oman. The former Herd
and McKenzie shipyard
site now forms part of
Macduff Shipyard
2023
Ocean Winds establish their
operations and maintenance
base for Moray West offshore
windfarm at Buckie Harbour
05
Page 74

Page 75

Buckie Now
On the south of the Moray Firth coastline, Buckie is well placed for access from Aberdeen, Inverness
and the wider Scotland. The harbour is an all-weather port with favourable marine access and transit
times into the Moray Firth.
Now with a focus on offshore wind operations and maintenance, Buckie remains a mixed use
harbour with strong links to the fishing industry. It’s vital to the local and regional economy –
supporting the whisky industry and heavy manufacturing alike.
The harbour is a base to many industries operating in and around the port area.
1. Fishing: Buckie has a long-standing tradition as a fishing port, and the fishing
industry remains one of the dominant sectors operating in the harbour. The port
serves as a base for various fishing vessels, including trawlers, fishing boats, and
creel boats, supporting the local fishing fleet and seafood processing businesses.
2. Cargo and Freight: Buckie Harbour facilitates the transportation of cargo and
freight, serving as a vital link for the import and export of goods for the local and
regional economy. Barley for the whisky industry, aggregates and salt are key
commodities. The harbour has laydown and storage for cargo, and an on site
stevedore service.
06
Page 75

Page 76

3.Offshore and Renewable Energy: With the growing focus on renewable energy,
Buckie Harbour has seen an increase in activity related to offshore wind energy
projects. A range of crew transfer vessels operate from the harbour, which is also the
base for Moray West offshore renewables operations and maintenance facility.
4.Marine Services: The harbour hosts various marine services, with the renowned
Macduff Shipyard operating via slipway access at the east of the harbour providing
ship build, repair and maintenance facilities. Marine engineering, heavy and skilled
component manufacturing are also provided adjacent to the harbour, along with
other supply chain businesses and an RNLI Lifeboat station.
Alongside the harbour, the landside areas adjacent to Buckie Harbour include a thriving selection of
businesses and amenities. These include shops, restaurants and local businesses which create a
vibrant and welcoming atmosphere for residents and visitors.
The landside areas and spaces that surround the harbour incorporate green spaces, industry,
and recreational facilities. This reflects Buckie’s commitment to environmental conservation and
community well-being while providing excellent potential to accommodate future sustainable
development.
07
Page 76

Page 77

Skills and Personnel
• Moray offers a well-educated, skilled workforce with a great reputation for customer service,
enjoying low staff turnover and high retention rates. The area also has access to an even
wider labour pool with 236,000 people within a one hour drive of Elgin. Moray has 85% of its
working age population in employment, higher than the Scottish average (80%). 
• The area has a track record in military aerospace. RAF Lossiemouth is one of the largest and
busiest fast-jet bases in the Royal Air Force and Kinloss Barracks is home to 39 Engineer
Regiment. This military presence means that electrical and mechanical engineering
skills are highly developed in the local workforce. With the retirement age from the armed
forces between 40-55 many seek onward skilled employment in the area. The strengths of
engineering skills, and the strategy to diversify the benefits of the oil and gas industry around
Scotland, put Moray in a prime position as a great place to invest.  
• There are a host of education providers with expertise in engineering and maritime skills
through University of the Highlands & Islands (Moray) in Elgin and North East Scotland
College in Fraserburgh and Aberdeen.
Transport and Infrastructure
• Buckie, population 9,000, is located on the A98 – 56 miles from Inverness and 63 miles from
Aberdeen, with abnormal / heavy load route availability for onward journeys. Centrally
located close to a number of offshore wind sites (existing and potential) and on-land
windfarm sites. Both Inverness and Aberdeen airports are well served with regional and
international flights.  
• Moray is a heartland for skilled engineering and fabrication, and the Harbour hosts both
Forsyths Fabricators and Macduff Shipyard along with other supply chain organisations.  
• The Harbour area presents a number of opportunities for land-based development for
the supply chain with sites suitable for laydown, O&M bases, training centres, and small
business start ups.
08
Page 77

Page 78

Current vessel access
• Maximum length 86m
• Maximum beam 15m
• Maximum draught 4.5m
• Harbour is staffed and operational 24/7
• Pilotage provided on request
• Stevedore and craneage facilities
• ISPS compliant port
• RNLI lifeboat based in the harbour
• Fire service located within Buckie
Usable Quay
• Basin 1 – 330m
• Basin 2 – 250m (half under lease)
• Basin 3 – 250 (half under lease)
• Basin 4 – 300m
• Tidal range of 4.8m
09
Page 78

Page 79

Harbour Development
Offshore Wind
In 2022 Crown Estate Scotland announced the outcome from the ScotWind Leasing application
which would see approximately £700 million being invested into the Scottish Offshore renewable
sector. Now, 19 sites have been selected with an overall capacity of over 30GW. This will see
windfarms spanning over 7000km2 and providing numerous jobs to the surrounding Moray Firth area.
It is likely that manufacture and fabrication of the larger components required to supply offshore
wind farms in the vicinity will be serviced by the larger ports located in the Cromarty Firth, which may
have capability to facilitate Tier 1 and 2 activities. Buckie is ideally placed to support Tier 3 activities
such as parts supply, vessel support, diving, lubricants, training and more. Maintenance activities
could be carried out using crew transfer vessels (CTVs) to transfer labour, technicians and engineers
between the harbour and neighbouring wind farms. This builds on the strong track record already
established in relation to O&M for Moray West and other supporting work.
10
Page 79

Page 80

Fishing
In 2023 Scottish vessels landed 501,000 tonnes of sea fish and shellfish with a gross value of £683
million, 323,000 tonnes were landed into Scotland. This is a 27% increase compared with 2019.
Fishing remains a significant industry within Buckie. Fish processing and supply companies local to
the area make use of the product delivered from local fishermen. Companies including Cluny Fish,
Orkney Food Company and Associated Seafoods provide strong financial and economic benefit to
the local economy.
□Data from Scottish Sea Fisheries Statistics 2023
11
Page 80

Page 81

Cargo
Scottish ports handled a total of 59 million tonnes of freight in 2022, primarily in the form of bulk
fuel (34 million tonnes). From 1997 to 2002, exports through major Scottish ports witnessed a
notable increase, climbing from 61 million tonnes to 68 million tonnes. However, a subsequent
decline followed, resulting in a steady decrease to 26 million tonnes by the year 2022, indicating
the gradual decline of Scotland as a cargo exporter. 
□Data from Scottish Transport Statistics 2023
Although the cargo industry as a whole has been on the decline in Scotland, Buckie has managed
to turn it into a strength within their economy. Cargo remains a key component of harbour activity,
consisting of malt/barley, salt, soya, wheat feed, sugar beet, steelwork, timber and aggregates.
12
Page 81

Page 82

0
20,000
40,000
60,000
80,000
100,000
120,000
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Cargo Import
Cargo Export
Cargo tonnes
Buckie Harbour Cargo
Volumes
13
Page 82

Page 83

Shipbuilding
In Scotland, shipbuilding contributed £262 million to the Gross Value Added (GVA) in 2020,
accounting for 0.19% of the Scottish economy and 7% of the GVA in the marine sector. Shipbuilding
also provided employment for approximately 7,000 individuals, representing 0.26% of total
employment in Scotland and 10% of employment within the marine economy. Scotland made up
12% of all shipbuilding enterprises within the UK as of 2020. There has been a steady decline in
the revenue earned by Scottish shipbuilding in recent years and as a result employment within this
industry has dropped by 7% between 2011 and 2020.
In 2020 64% of all shipbuilding in Scotland was carried out Glasgow, Aberdeenshire, and Fife.
This indicates that larger ports have the majority of the revenue in this sector. Consequently, this
situation poses challenges for smaller harbours to compete effectively in terms of market share and
economic opportunities.
Despite the national trends, Buckie has remained a vibrant location for shipbuilding. Macduff
Shipyards have operated a facility in Buckie since 2013. Since then, they have expanded and
diversified operations including acquisition of the disused Buckie Shipyard site in 2017, with on-site
development and expansion over recent years increasing capacity.
Once predominantly utilised for fishing vessel construction and maintenance, ship building
operations at Buckie harbour now include the construction, maintenance and storage of multiple
vessel formats. This includes dredging vessels, construction barges, landing crafts for the
aquaculture sector, ferries, and Crew Transfer Vessels (CTVs) for the offshore renewables industry.
This industry involves collaboration of several businesses at Buckie during construction, fit out and
maintenance operations as well as usage of multiple areas, structures and berths within the harbour.
The shipbuilding industry within Buckie Harbour is growing strongly with the construction and fit out
of vessels. There is a strong desire amongst local businesses to expand further with the potential to
embrace further opportunities in both the fishing, leisure, offshore and renewables sectors.
Optimisation / expansion of the harbour and facilities in combination with the development of
existing disused sites will raise the potential to develop this industry and capture future opportunities
for continued growth. 
□Data from Scotland’s Marine Economic Statistics 2020  
14
Page 83

Page 84

15
Page 84

Page 85

16
Page 85

Page 86

GWO Training
Global Wind Organisation (GWO) training programmes are designed to ensure that individuals
working in the wind industry possess the necessary knowledge and skills to carry out their jobs safely
and efficiently. These training courses cover a wide range of topics, including basic safety, first aid,
fire awareness, manual handling, working at heights, and sea survival, among others.
There is potential for Buckie Harbour to host a training hub, offering courses for Scottish wind
industry professionals. There are few GWO training facilities within in Scotland, typically based in
Glasgow and none in the nearby area. Offshore renewable investors have expressed that a GWO
training facility in close proximity to their sites along the coast would be a very valuable asset in
assisting in their operations.
Development of a training hub along the Moray Firth coast would be a valuable resource for the local
offshore renewable industry and may lead to the development of close ties between Buckie Harbour
and leading offshore renewable investors in the future.
Tourism
A total of 2.2 million cruise passengers used UK ports in 2023, continuing the strong growth profile
of this sector, particularly for UK destinations. Each passenger visiting via a UK port adds £70 to the
local economy. Buckie is ideally placed close to Speyside, home to over 50% of Scottish whisky
distilleries and Moray is home to high profile international brands – including Johnstons of Elgin, and
Walkers Shortbread. This makes Buckie an ideal location for accessing the tourism offering of Moray,
Speyside and the Cairngorms. 
Marine tourism is also a growing sector, particularly in relation to wildlife. The Moray Firth is home to
the Scottish Dolphin Centre at Spey Bay, with the Firth not only home to dolphins, but increasingly
orca whale sightings. 
□Data from Cruise Britain
17
Page 86

Page 87

Emerging Markets
There are a range of green energy developments emerging: 
Green Ammonia: created by combining hydrogen (produced through renewable energy powered
electrolysis) with nitrogen (sourced from the air). This provides efficient means of transporting
hydrogen for use as a fuel. The green ammonia can also be used for marine fuel, along with its
traditional use in the production of agricultural fertilisers and other chemical products.
Green Methanol: created by synthesising green hydrogen with captured carbon dioxide – for
example from a biomass power plant. Green methanol is in demand in many industrial applications
and can be used for powering engines and fuel cells – including for marine vessels.
18
Page 87

Page 88

Harnessing Opportunities
The harbour benefits from:
• Year round safe haven conditions
• Excellent transport links
• Ability to cater to diverse needs
• A strong supply chain and other local
businesses and industries
• A centrally positioned location on the Moray
Firth with a relatively short distance to
existing and proposed offshore windfarms
• Local workforce opportunities with skilled
personnel
Constraints to future growth:
• Overall harbour size limitations constraining
vessel length and draft
• Overall capacity
• Need for additional laydown and general
purpose space
Developing the harbour will allow the
opportunities to be maximised and constraints
to be addressed.
19
Page 88

Page 89

Development Opportunities
Renewable and Green Energy
Buckie Harbour has a potential opportunity to establish itself as a hub for supporting the offshore
renewables industry in Scotland. The industry has already taken interest in Buckie Harbour with
Ocean Winds selecting it as a base for offshore O&M projects in Moray Firth. By enhancing existing
facilities, the harbour could improve opportunities within the offshore renewables industry by
effectively supporting Crew Transfer Vessel (CTV) operations in an even greater capacity. During the
consultation process Ocean Winds representatives noted “further CTV capacity may be useful at
Buckie as requirement for the Caledonia wind farm although this is yet to be confirmed”.
Through the expansion of the harbour and storage facilities in its hinterland, it could have a potential
opportunity to serve as a valuable base for Service Operation Vessel (SOV) operations and support
activities for offshore windfarm development as well as Operation & Maintenance phases.
Tourism and Cruise Vessels
An expanded harbour will provide the facility for the harbour to take in small and medium sized
cruise vessels without the need for passengers to be transferred by tender. This will enable the region
to capitalise on the growing tourism markets from the cruise sector, and provide easy access to the
tourist attractions of Moray and Speyside. Growing the number of cruise vessels accessing the area
via Buckie will allow partnership working with local businesses to provide itineraries and tours to
enhance the passenger offering.
GWO Training
In addition to marine expansion, the harbour area has a number of shoreside development sites,
which could provide an ideal location for GWO training. Putting facilities at the heart of the Moray
Firth, in easy access of not just Buckie based offshore organisations but also of those operating
across the Moray Firth, bridges the market gap and reduces the need to travel.
Green Energy
20
Page 89

Page 90

An expanded harbour can create an ideal
location for the storage and transport of green
fuels – including both green ammonia and
e-methanol, fuelling the regional marine sector
and enabling the local transport sector to move
to green fuel sources.
21
Page 90

Page 91

Proposals
At the heart of the future is the creation of
additional capacity, allowing for greater
numbers of, and a wider range of vessel
sizes, to be accommodated in Buckie
Harbour. This can be achieved by reordering
the eastern part of the existing harbour and
expanding the harbour, either to the north or
to the west. Buckie has the flexibility to offer
a range of development options catering to
the needs of the future.
Northern Expansion
• 1,040m usable quay
• 31,750m2 of quayside
• Depth of 9m below chart datum
• 180m turning radius in both basin and
entrance
• Heavy lift capacity up to 25T/m2 on
South Quay
22
Page 91

Page 92

23
Page 92

Page 93

Western Expansion
• 445m usable quay
• Dredge depth to 6m below chart datum
• 140m turning radius
• 13,750m2 laydown area 
24
Page 93

Page 94

25
Page 94

Page 95

Basin 4 Upgrade
• Slipway readying Berth
• New RNLI pontoon
• Dedicated creel boat berth
• Additional harbour parking (20 spaces)
• HGV turning area
26
Page 95

Page 96

27
Page 96

Page 97

For more information, including detail
on  technical feasibility, or to discuss our
proposals further, please contact:
HarbourDevelopment@moray.gov.uk
Page 97

Page 98

Page 98

Page 99

Report to: Meeting Date:Economic
Development and
Infrastructure Services
Committee
17 June 2025
Report by: Report No:Depute Chief Executive
(Economy,
Environment and
Finance)
ECS025/25/DA
Author: Diane Anderson Contact Email: diane.anderson@moray.gov.uk
Subject: Traffic Regulation Orders and Waiting Restrictions Orders to support
Levelling Up Fund project in Elgin Town Centre
1. PURPOSE
☒ For Decision      ☐  For Information
1.1 The purpose of this report is to seek approval to begin the consultation process for the
proposed amendments to the existing traffic regulation and waiting restrictions orders
covering Elgin town centre along with a new traffic regulation order for one-way
sections of road on Moss Street and Greyfriars Street, Elgin.
1.2 This report is submitted to Committee in terms of Section III (F) 17 and (F) 20 of the
Council’s Scheme of Administration relating to traffic management functions including
the preparation and implementation of traffic management schemes and the making of
Orders for the regulation and management of traffic.
2. SUMMARY
2.1 The Council has been awarded £18.3m from the Levelling Up Fund, which includes
funding for Active Travel measures which seek to reallocate road space on Lossie
Wynd, Commerce Street, High Street (East) and Moss Street to provide dedicated
space for cyclists to travel against the flow of traffic. There are also associated
improvements for pedestrians on these streets, including the introduction of a new
footway on the western side of Lossie Wynd between the High Street and St Giles
Road.
2.2 The existing pedestrianised areas within the town centre experience low levels of
compliance, with unauthorised vehicles regularly driving over and parking within them.
To support these pedestrianised areas, funding from the Levelling Up Fund is available
for access control measures which will enable access for authorised vehicles e.g.
deliveries, emergency services, whilst creating a more welcoming and safer
environment for pedestrians.
Item 9.
Page 99

Page 100

2.3 To implement these measures, changes to the existing town centre Traffic Regulation
and Waiting Restrictions Orders are required, along with a new traffic regulation order
to introduce one-way sections of road on Moss Street and Greyfriars Street.
2.4 This report seeks approval to start the consultation process for the amended and new
orders, including an information event for the public and businesses, prior to the
commencement of the statutory process.
3. RECOMMENDATIONS
3.1 It is recommended that Committee:
i) Agree to consult on the proposed amendments to the existing Elgin
Town Centre Traffic Regulation and Waiting Restriction Orders on the
following streets: -
a) High Street West
b) Thunderton Place
c) Batchen Street
d) South Street
e) Commerce Street
f) High Street East
g) Lossie Wynd
h) The Plainstones
ii) Agree to consult on the proposed new Traffic Regulation Order on the
following streets within Elgin: -
a) Moss Street; and
b) Greyfriars Street
iii) Instruct the Head of Economic and Commercial Service and the Head of
Governance Strategy and Performance to complete the preparation of
the Orders following the initial consultation and proceed with the
Statutory Process. Once the Statutory Process has been completed, also
instruct them to make and implement the Orders if, following the
statutory consultation period, there are no outstanding objections.
Diane Anderson
Senior Engineer Transportation
4. BACKGROUND AND CONTEXT
4.1 The existing Elgin Town Centre Traffic Regulation Order (TRO) sets out the
requirements for the pedestrianised areas on The Plainstones, Batchen Street,
Thunderton Place, Commerce Street, and the section of the High Street between The
Plainstones and Lossie Wynd. The TRO also sets out one-way sections of road and
access restrictions. There is a separate order which sets out the Waiting Restrictions
within the town centre. The current TRO and Waiting Restrictions Order have been in
place since 2011.
4.2 At a Special Meeting of Moray Council on 9 August 2017 (para 3 of minute refers), the
Council approved the Elgin Transport Strategy (ETS). Within the strategy there is a
scheme to make Moss Street one-way to enable road space reallocation for an active
travel route, which would improve access to the Town Centre from the southern parts of
Elgin.
Page 100

Page 101

4.3 The Elgin City Centre Masterplan was approved at the Planning and Regulatory
Services Committee meeting on 16 November 2021 (para 12 of minute refers). The
vision for the masterplan is “To transform Elgin City Centre into a successful, well-
connected, healthy, green, attractive, inclusive and carbon conscious centre offering a
variety of attractions where people of all ages and abilities shop, live, relax and do
business.” 
4.4 Specific transport related schemes within the Masterplan included the ETS Moss Street
improvements (project Core Retail 10), and access control measures to enforce the
Pedestrianisation Order on Batchen Street to support outdoor hospitality (project Core
Retail 14). Wider access control measures for all the pedestrianised areas were
included as part of the consultation on the Masterplan, as a result of the changes in
behaviours during the Covid-19 lockdowns where unauthorised vehicles regularly
began entering The Plainstones and other pedestrianised areas. Despite targeted
enforcement action by Police Scotland during 2024, these behaviours persist.
4.5 In 2023 Moray Council was awarded £18.3m from the Levelling Up Fund of the Elgin
City Masterplan for three linked projects, Transforming the Sawmill, A Vibrant Centre,
and Re-imaging Cooper Park. As part of the Vibrant Centre project there are a series of
Active Travel measures proposed. The Active Travel measures seek to reallocate road
space on Lossie Wynd, Commerce Street and Moss Street to provide dedicated space
for cyclists to travel against the flow of traffic. There are also associated improvements
for pedestrians on these streets, including the introduction of a new footway on the
western side of Lossie Wynd between the High Street and St Giles Road and
improvements to the contra-flow cycle lane on Lossie Wynd to address public concerns
relating to the existing kerbs.
4.6 The Levelling Up Fund also includes an allocation for the provision of access control
measures to deter unauthorised vehicles from entering the existing pedestrianised
areas within the Town Centre. This would create a more welcoming and safer
environment for pedestrians and in some locations, enable the accommodation of
outdoor hospitality.
4.7 The proposed access control measures would be in the form of rise and fall bollards,
which are automatically operated. Measures such as these have been installed across
the UK by many local authorities. They provide a physical barrier and generally use an
electric or hydraulic mechanism installed under the road which are raised or lowered
automatically in response to a trigger. A nearby cabinet contains the control and
communication equipment and adjacent to the bollards there would be warning signs
and red/green warning lights which would indicate to drivers of authorised vehicles
when they should stop and when it is safe to proceed. The control measures would
enable access by delivery vehicles, emergency services, residents/ businesses with off
-street parking, and other authorised vehicles.
4.8 A review of Disabled Persons Parking Places (DPPP) has recently been undertaken in
the Town Centre and was reported to this Committee on 29 April 2025 (Para 13 of the
draft minute refers). This review identified locations for new DPPP to address the
proposed removal of DPPP from Commerce Street, which would be required to enable
the active travel route and improvements for pedestrians, and to provide high quality
spaces to the west of The Plainstones in response to previous consultation on parking
provision within Elgin Town Centre.
4.9 Although the proposed changes to Town Centre have been part of previous
consultations, it is intended to hold an information event and speak with individual
businesses and residents who would be directly affected prior to the commencement of
Page 101

Page 102

any formal consultation on the revisions required to the existing Traffic Regulation and
Waiting Restrictions Orders and new Traffic Regulation Order for Moss Street.
5. PROPOSALS
5.1 The proposed changes to the Town Centre fall into three categories, changes to: -
 existing pedestrianised areas.
 the direction of traffic flow on Commerce Street; and
 waiting restrictions, which includes loading bays, DPPP and relocation of a taxi
rank.
5.2 Outwith the Town Centre, the proposed North-South Active Travel route would seek to
reallocate road space to enable the provision of infrastructure for pedestrians and
cyclists on Moss Street. There are two options which could achieve this:
 Option 1 – introduction of one-way northbound on Moss Street from the
Laichmoray roundabout to its junction with South Street/Greyfriars Street.
 Option 2 – closure of the southern end of Moss Street at the Laichmoray
roundabout to general traffic and introduce a one-way section (northbound)
between Institution Road and South Street.
On Greyfriars Street, a one-way section (eastbound) would be required between South
Street and Glover Street for both options.
Pedestrianised Areas
5.3 The proposed changes to the existing pedestrianised areas in the town centre, which
would be supported by the proposed access control measures, would create a safer,
more welcoming environment for pedestrians using these areas and, in some locations,
enable hospitality businesses to provide outdoor seating for dining and drinking.
5.4 The existing streets in the town centre subject to a Pedestrianisation Order, shown on a
map contained in Appendix 1, are:
 The Plainstones – 24 hours with exemptions for permit holders and loading
between 4pm to 11am.
 Thunderton Place – 24 hours with exemptions for taxis, loading and Blue Badge
holders.
 Batchen Street - 24 hours with an exemption for loading.
 Commerce Street - 24 hours with exemptions for taxis, loading and Blue Badge
holders; and
 High Street (East) between Commerce Street and Lossie Wynd – 24 hours with
exemptions for taxis, loading and Blue Badge holders.
5.5 The proposed changes to the pedestrianised areas, which would be supported by the
proposed access control measures) are as follows:
 The Plainstones – No Change (remains as 24 hours with exemptions for permit
holders and loading between 4pm to 11am).
 Thunderton Place – Change to remove exemptions for taxis and Blue Badge
holders between 11am and 4pm (exemptions would remain between 4pm and
11am) Blue Badge Holders parked before 11am would be permitted to exit at
any time.
 Batchen Street – Change to remove access for small package drop off/pick up
by members of the public between 11am and 4pm to facilitate outdoor
hospitality.
Page 102

Page 103

 Commerce Street – Change to remove exemptions for taxis and Blue Badge
holders; and
 High Street (East) between Commerce Street and Lossie Wynd – Change to
remove exemptions for taxis and Blue Badge holders.
5.6 The proposed access control measures for each of the above streets would be
operations between 11am and 4pm. This means that deliveries to businesses during
that period would require a ‘fob’ to operate the bollards. Out with those times, the
bollards would be activated and lowered through the presence of a vehicle being
detected by the operating system. This would enable access for taxis and other
vehicles used by takeaways for home deliveries after 4pm.
Commerce Street
5.7 Commerce Street is an existing southbound one-way street which has an uphill
gradient. As part of the north-south active travel scheme it is proposed to change the
direction from southbound to northbound. This would enable cyclists to travel with other
traffic on the downhill gradient, whilst a contraflow cycle lane would be provided for
southbound cyclists giving them protected space as they travel slower uphill. The
existing and proposed cross sections of one-way road are shown on the maps provided
at Appendix 2.
5.8 The section of the High Street between Commerce Street and Lossie Wynd would also
become one-way (eastbound). This would address the current behaviours by some
vehicles where they are entering The Plainstones from the eastern end. Delivery
vehicles and residents who need to access Commerce Street, would do so via South
Street. Exiting vehicles would use the High Street (east) and Lossie Wynd. Whilst traffic
would marginally increase on these two routes, traffic using Greyfriars Street, Glover
Street and the eastern end of the High Street would reduce.
Town Centre Waiting Restrictions
5.9 Within the town centre, changes are required to the existing waiting restrictions, loading
bays, disabled parking and taxi ranks to support the Levelling Up Fund projects.
5.10 The proposed changes to the waiting restrictions are as follows and are summarised in
Appendix 3: -
 Commerce Street – remove loading area and DPPP to enable widening of
footways and provision of one-way contraflow cycle lane. Delivery vehicles to
stop on carriageway whilst loading/unloading.
 South Street – amend the length of the existing loading bay at 51 South Street
to enable emergency vehicle access to rear of South Street redevelopment
project.
 High Street between Commerce Street and Lossie Wynd – remove loading bay
at 71-83 High Street to enable road space reallocation for north-south active
travel route and provision of access control measures for pedestrianised areas.
 High Street between Lossie Wynd and North College Street – lengthen the
existing loading bay at 67 High Street, relocate the existing taxi rank from
outside 9 High Street to 43 – 49 High Street, introduce a new loading bay at 37
– 41 High Street which can be used by taxis from 9pm to 4am, and introduce a
new DPPP at 51 High Street.
 Lossie Wynd – redetermination of the existing cycle track to become on
carriageway contraflow cycle lane.
 High Street between Cooper Frasers Close and The Plainstones – creation of
new lay-bys on northern side of High Street at 165 – 177 High Street and on
Page 103

Page 104

southern side of the road at 144 – 150 High Street to accommodate up to six
new DPPP.
 North Guildry Street – provision of two new on-street DPPP at 2 North Guildry
Street.
Moss Street and Greyfriars Street
5.11 The proposed north-south active travel route would enable enhanced provision for
pedestrians and cyclists. There are two options to facilitate these improvements,
Option 1 which would convert Moss Street to one-way northbound and Greyfriars
Street between Moss Street and Glover Street to one-way eastbound and Option 2
which would see the closure of Moss Street to general traffic at the Laichmoray
roundabout, a section of one-way northbound traffic introduced between Institution
Road and Greyfriars Street and one-way eastbound traffic on Greyfriars Street between
Moss Street and Glover Street. The proposed changes for both options are shown in
Appendix 4.
5.12 Option 1 to make Moss Street one-way is included in the ETS. At the time of the
strategy the decision on the direction of traffic flow was not finalised. However, the
proposal is for the direction of traffic flow to be north bound as this would reduce the
number of vehicles entering the busy Laichmoray roundabout, improving the operation
of this junction through reducing the number of conflicting vehicle movements.
Greyfriars Street would become one-way eastbound, between Moss Street and Glover
Street. The carriageway width would be reduced to enable the provision of wider
footways and a contra-flow cycle lane dedicated for cyclists travelling southbound.
5.13 The proposed one-way would be supported by changes to the roads entering Moss
Street as follows:
 Preventing vehicles from entering Greyfriars Street westbound at its junction
with Glover Street;
 Preventing vehicles from turning right from South Street onto Moss Street;
 Vehicles joining Moss Street from Alma Place, Maida Place and Francis Place
would only be permitted to turn left (joining the northbound traffic flow); and
 Vehicles joining Moss Street from Institution Road would only be permitted to
turn right.
5.14 Option 2 would make Moss Street one-way northbound between Institution Road and
Greyfriars Street. Whereas the southern section of Moss Street between Institution
Road and the Laichmoray roundabout would remain two-way with vehicular access for
residents and businesses only.  Moss Street would be closed at the roundabout to all
motor vehicles with exemptions for northbound travel for permit holders (e.g. refuse
collection vehicles, removal vehicles, funeral processions).  To the north of Institution
Road, traffic would be permitted to travel northbound only with the carriageway
narrowed to enable widening of the footways and the provision of a contraflow cycle
lane. Greyfriars Street would become one-way eastbound between South Street and
Glover Street as a continuation of the one-way section of Moss Street.
5.15 The proposed one-way would be supported by changes to the roads entering Moss
Street as follows:
 Preventing vehicles from entering Greyfriars Street westbound at its junction
with Glover Street;
 Preventing vehicles from turning right from South Street onto Moss Street; and
 Vehicles joining Moss Street from Maida Place and Francis Place would only be
permitted to turn left (joining the northbound traffic flow).
Page 104

Page 105

5.16 Both options will be subject to consultation, prior to the finalisation of any traffic
regulation order. It should be noted that the introduction of the restrictions set out in
Option 2 addresses concerns raised by residents of Moss Street regarding its use as a
‘rat-run’ and the speed of traffic, and result from an informal conversation with
residents.
Process for Traffic Regulation and Waiting Restrictions Orders
5.17 The Local Authorities’ Traffic Orders (Procedure) (Scotland) Regulations 1999 sets out
the procedure relating to consultation and the making of such orders. The first step will
be informal consultation with residents and businesses directly affected by the
proposals along with emergency services. This will be followed by a public information
event to be held on 28th June/5th July 2025.
5.18 Following the information event, comments will be considered, and the proposals will
be finalised. The draft orders and drawings will then be subject to formal consultation
with statutory bodies. Subject to there being no unresolved representation from the
statutory bodies, the formal public consultation period will commence. The minimum
period for the public consultation is 21 days. However, as the consultation will take
place during the summer months, it is proposed to extend this period to 28 days giving
a longer opportunity for the public to make any representations.
5.19 Officers will seek to address any representations received. However, if there remain
unresolved representations then they will be reported to a future meeting of this
committee.
5.20 Following a successful conclusion of the TRO process, it is anticipated that works
would commence in late Spring of 2026 and be completed by 2027.
6. SUMMARY OF IMPLICATIONS
6.1 The table below shows whether risks and implications apply if the recommendations
are agreed:
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement
Plan)
X
Policy and Legal X
Financial X
Risk X
Staffing X
Best Value and Transformation X
Property X
Information Communications Technology/Digital           X
Equalities. Social Inclusion and Economic Impact           X
Climate Change and Biodiversity Impact          X
6.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans.
a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following
Council Plan strategic priorities:
Page 105

Page 106

☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population
6.3 Policy and Legal
The Council has the authority under the Road Traffic Regulation Act 1984 to introduce
waiting restrictions, one-way sections of road, provide on-street disabled persons
parking spaces, and make exemptions for certain vehicle types through Traffic
Regulation Orders. The Local Authorities’ Traffic Orders (Procedure) (Scotland)
Regulations 1999 sets out the procedure relating to consultation and the making of
such orders. The proposals and consultation process set out in this report complies
with both sets of regulations.
6.4 Financial
The proposals and associated Traffic Regulation and Waiting Restrictions Orders are
to be funded through the Levelling Up Fund grant, under the Vibrant Centre project.
The consultation, legal and advertising costs for the Orders are as follows:
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend
this Year
Virement
From
Other
Comment
s
Economic
Developme
nt
Levelling
Up Fund
25/26 £10,000 n/a Note:
Legal
Costs are
estimated
on the
basis that
there are
no
unresolved
objections
to the
orders.
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable
)
Other
Comment
s
n/a n/a n/a n/a n/a n/a
6.5 Risk
Page 106

Page 107

The promotion of the Road Traffic Regulation and Waiting Restrictions Orders may
result in objections from interested parties which this committee may have to consider
later if the issues cannot be resolved.
6.6 Staffing
None. Due to staffing issues within legal services, the work on the required TROs will
be outsourced to external legal advisers.
6.7 Best Value and Transformation
None.
6.8 Property
None.
6.9 Information Communications/Technology/Digital
None.
6.10 Equalities, Social Inclusion and Economic Impact
An Integrated Impact Assessment (IIA) was undertaken to support the recent review of
DPPP and is contained in Appendix 5. The proposals make improvements to the
parking provision in Elgin for people with disabilities taking account of the various
needs within the community and the feedback from previous consultation. Although
impacts have been identified they can be mitigated and justified.
This is accompanied by an IIA for the proposed active travel schemes, access control
measures and changes to other waiting restrictions (e.g. loading bays) in Appendix 5.
The proposed changes will enhance provisions and access for vulnerable road users,
including children, older persons, and disabled persons through new and widened
footways. Accessibility Audits for the proposed changes will be undertaken as part of
the detailed design process.
6.11 Climate Change and Biodiversity Impacts
The proposals will have a positive impact on climate change as they will enable the
provision of dedicated road space for active travel, which will encourage journeys into
the town centre to be made by active modes.
7. CONSULTATION
7.1 This report has been prepared in consultation with the Depute Chief Executive
(Economy, Environment, Finance), Head of Economic and Commercial Services, Chief
Finance Officer, Legal Services Manager, Strategic Planning and Development
Manager, Principal Climate Change Officer, HR Manager, Equal Opportunities Officer
and Committee Services Officer (C O’Connor) and any comments made have been
incorporated into the report.
8. BACKGROUND PAPERS
8.1 Report to Economic Development and Infrastructure Services Committee 29.4.25 -
Disabled Parking Review
Moray Council - Elgin Transport Strategy
Report to Special Moray Council Committee 9.8.17 - Elgin Transport Strategy and
Appendix 1
Page 107

Page 108

Report to Economic Development and Infrastructure Services Committee 31.10.17 -
Elgin Parking Strategy and Appendix 1, Appendix 2, Appendix 3, Appendix 4
Elgin City Centre Masterplan
Report to Planning and Regulatory Services Committee 16.11.21 - Elgin City Centre
Final Masterplan and  Appendix 1,  Appendix 2,  Appendix 3, Appendix 4
Report to Moray Council 30.6.21 – UK Levelling Up Fund (confidential report)
Report to Moray Council 29.6.22 – UK Levelling Up Fund Bid (confidential report)
Report to Moray Council 6.12.23 – Levelling Up Funding Update (confidential report)
Page 108

Page 109

FINAL
APPENDIX 1
Location of Existing Pedestrianised Areas in Elgin Town Centre
Page 109

Page 110

FINAL
APPENDIX 2
Cross-Sections for Commerce Street and Lossie Wynd Existing – Commerce
Street
Proposed – Commerce Street
Page 110

Page 111

FINAL
APPENDIX 2
Existing Lossie Wynd (South Section)
Proposed Lossie Wynd (South Section)
Page 111

Page 112

FINAL
APPENDIX 3
Summary of Proposed Changes to Town Centre Traffic Regulation Order and Waiting
Restrictions
Street Name Current Traffic Regulation
Order
Proposed Changes
Moss Street Waiting restrictions Amend waiting restrictions to
minimise on-street parking
Option 1
One-way northbound between
Laichmoray Roundabout and
South Street
Option 2
Removal of vehicle rights of
access at Laichmoray
Roundabout, with exemptions
One-way northbound between
Institution Road and South
Street
Greyfriars Street Waiting and loading restrictions One-way eastbound between
South Street and Glover Street
Commerce Street One-way southbound One-way northbound
Disabled parking Remove disabled parking (new
spaces created elsewhere in the
Town Centre)
Loading bay Remove loading bay - vehicles
can stop on street
Waiting and loading restrictions Revise waiting and loading
restrictions
Pedestrianisation order 24
hours (exempt taxis, loading, BB
holders)
Rise and fall bollards to control
access from 11am to 4pm,
change order to remove
taxi/BBH exemptions
South Street One-way eastbound
Disabled parking
Loading bays Amend loading bays
Waiting restrictions (no
loading/unloading)
Revise extent of waiting
restrictions (retain no
loading/unloading)
High Street (btwn Commerce
St and Lossie Wynd)
Loading bay Remove loading bay
Waiting and loading restrictions
Revise waiting and loading
restrictions
Pedestrianisation order 24
hours (exempt taxis, loading, BB
holders)
Rise and fall bollards to control
access from 11am to 4pm,
change order to remove
taxi/BBH exemptions
High Street (btwn Lossie
Wynd and North College
Street)
Loading bay amend loading bay provision
Disabled parking review disabled parking to
create additional space
Waiting and loading restrictions revise waiting and loading
restrictions
Taxi rank relocate taxi rank
Page 112

Page 113

FINAL
APPENDIX 3
Lossie Wynd One-way northbound btw High
Street and North Port Cycle track re-determination
Waiting restrictions
Batchen Street One-way southbound
Waiting restrictions
Pedestrianisation order 24
hours (exempt loading)
Rise and fall bollards to control
access from 11am to 4pm
Thunderton Place One-way northbound
Loading bay
Disabled parking Restricted access between
11am and 4pm. New disabled
parking area on High Street
Waiting and loading restrictions Revise waiting and loading
restrictions
Pedestrianisation order 24
hours (exempt taxis, loading, BB
holders)
Rise and fall bollards to control
access between 11am and 4pm,
change order to remove
taxi/BBH exemptions btn 11am
and 4pm
High Street (btw Cooper
Frasers Close and The
Plainstones)
One-way eastbound
Waiting and loading restrictions
Loading bays Create new disabled parking
layby outside Boots opticians
Taxi rank
The Plainstones Pedestrianisation order 24
hours (exempt permit holders,
loading 4pm to 11am)
Rise and fall bollards to control
access between 11am and 4pm
to permit deliveries and permit
holders only
Page 113

Page 114

FINAL
APPENDIX 4
Moss Street Options 1 and 2
Page 114

Page 115

FINAL
APPENDIX 4
Page 115

Page 116

FINAL
APPENDIX 5
Integrated Impact Assessment
INTEGRATED IMPACT ASSESSMENT COVERING
 EQUALITIES & SOCIO ECONOMIC DUTIES
 HUMAN RIGHTS AND RIGHTS OF THE CHILD
DATE UPDATES/EXECUTIVE SUMMARY VERSION DETAILS
Insert Date
(e.g.
03/10/2023)
Add brief notes/highlight which section amended (e.g.
first draft of IIA completed and submitted to SFC
25/10/2023 for consideration; noting that further work
on Stage 2 will be required).
Insert (ShP) Version Info
(when details have been
agreed) (e.g. 5.0 03/10/2023
11:21 AMcL)
05/05/2025 1st Draft for ED&I Committee on 17 June 2025
STAGE 1 - DO I NEED AN INTEGRATED IMPACT ASSESSMENT?
Name of policy or proposal:
Elgin Town Centre proposed changes to Traffic Regulation Order and Waiting
Restrictions and New Traffic Regulation Order for Moss Street and Greyfriars Street to
introduce sections of one-way traffic to support Active Travel schemes which are part of
the Vibrant Town Centre project for the Levelling Up Fund.
Is this a Mark X below
New activity, programme or policy?
Change to an existing activity, programme or policy? X
Budget proposal?
Duties: tick the boxes you think apply No Maybe Yes
Equalities: Will your proposal have an impact on groups with
protected characteristics?
Consider the impact of your proposal on people and how they
access your services and information without barriers.
X
Socio-economic
Not every person/family has access to regular income or
savings. Will your proposal have an adverse impact on them
X
Does your proposal impact on the human rights of people? X
Does your proposal impact on the rights of children and
young people
X
Reasoning - Briefly describe your reasoning for the responses given above:
The proposed changes will change the location of some Disabled Persons Parking
Places (DPPP) which has already been the subject of an IIA.
This IIA will therefore focus solely on the proposed road space reallocation and changes
to the direction of traffic flow and how that may affect groups from categories identified
above, individuals with disabilities, blue badge holders while creating positive outcomes
for other categories.
If you have answered “maybe” or “yes” to any of the Stage 1 questions above,
then proceed to complete the Stage 2 Integrated Impact Assessment questions
below.
If you have answered “no” to the Stage 1 questions above, then provide the
details below and submit to [email]
Lead Officer for developing the contract
Other people involved in the screening
(this may be council staff, partners
or others i.e. contractor or community)
Date Page 116

Page 117

FINAL
APPENDIX 5
STAGE 2: INTEGRATED IMPACT ASSESSMENT
Brief description of the affected service
1. Describe what the service does:
The proposals will reallocate road space to pedestrians and cyclists, change the direction
of traffic flow on Commerce Street and make the sections of Moss Street, High Street
(East) and Greyfriars Street one-way for motorised vehicles, along with closing the
southern end of Moss Street to motorised vehicles (exemptions will apply).
The proposals will also introduce access control measures for the existing town centre
pedestrianised streets to prevent access by unauthorised vehicles.
The proposed changes will change access routes for motorised vehicles and the location
of some Disabled Persons Parking Places (DPPP).
2. Who are your main stakeholders?
Members of the public, visitors, workers, businesses, and residents within the central area
of Elgin Moss Street and Greyfriars Street.
3. What changes as a result of the proposals? Is the service reduced or removed?
The proposed changes will remove unauthorised vehicular access to pedestrianised
areas within the town centre, creating a safer environment for all pedestrians and cyclists,
but in particular children, older persons, those with mobility issues and disabled persons.
The enhancements to footway provision will enhance and improve accessibility and
movement for all groups, not just those identified.
4. How will this affect your customers?
Increased accessibility will support and encourage community inclusion for all groups. 
Pedestrians and cyclists will benefit from enhanced, widened and/or new footways and
cycle paths which will improve the quality of the public realm and provide more dedicated
space for pedestrians and cyclists.  The proposals include dedicated space for cyclists on
the road-carriageway. There are no new areas where shared pedestrian-cycle use is
proposed.  Travel will become safer within central Elgin and Moss Street area. 
5. Impact on staff providing the service
None.
6. Please indicate if these apply to any of the protected characteristics
Protected groups Potential impacts and considerations
Race
Disability Impact – has the potential to affect those with a range
of disabilities.
The design of the improvements considers best
practice and will be reviewed as part of the detailed
design process to ensure that the needs of disabled
persons are considered.
Carers (for elderly, disabled or
minors)
Impact – has the potential to affect carers of those with
a range of disabilities.
Sex
Pregnancy and maternity (including
breastfeeding)
Sexual orientation
Age (include children, young
people, midlife and older people)
Potential impact – those with a disability span a range
of age groups.  Those within the older generation have
more mobility issues and the current eligibility criteria
Page 117

Page 118

FINAL
APPENDIX 5
for Blue Badge Permits includes parents of those
under 3 and children.
Religion, and or belief
Gender reassignment
Inequalities arising from socio-
economic differences
Human rights
List of convention rights Describe, where applicable, if and how specific
rights are engaged
Article 5: Right to liberty and
security
Article 6: Right to a fair trial
Article 8: Right to respect for
private and family life,
correspondence and the home
This includes a right to participate in essential
economic, social, cultural and leisure activities. In some
circumstances, public authorities may need to help you
to enjoy your right to a private life, including your ability
to participate in society.
Article 10: Freedom of expression Right to have views heard through the proposed
consultation on the proposed changes.
Article 11: Freedom of assembly
and association
Article 12: Right to marry
Article 14: Prohibition of
discrimination (in relation to the
convention rights)
Article 1 of Protocol 1: Protection
of property
Article 2 of Protocol 1: Right to
education
Article 3 of Protocol 1: Right to free
elections by secret ballot
Children’s Rights and Wellbeing
Relevant articles – UNCRC
Article 2 – Non discrimination Not to be discriminated against
Article 3.1 – Best interest of the child Best interests of the child must be a top
priority in all decisions and actions that
affect children.
Article 6.2 – Right to survival and
development
Article 12 – Respect of the views of the child
Article 23 – Children with a disability A child with a disability has the right, as far
as possible, to independence and to play an
active part in community with support.
7. Evidence. What information have you used to make your assessment?
Performance data
Internal
consultation
Equalities Officer
Consultation with
affected groups
Proposed consultation. Previous consultation has taken place as
part of the Elgin Transport Strategy and Elgin City Centre
Masterplan.
Local statistics
Page 118

Page 119

FINAL
APPENDIX 5
National
statistics
Other
8. Evidence gaps
Do you need additional information in order to complete the information in the
previous questions?
9. Mitigating action
Can the impact of the proposed policy/activity be mitigated?  Please explain
Any impact of the proposed changes to pedestrian and cycle provision can be mitigated
through the detailed design process to ensure that the needs of disabled persons,
including disabled children, and children and older persons are taken into account
through following best practice and seeking an Accessibility Audit by a qualified person.
10. Justification
If nothing can be done to reduce the negative impact(s) but the proposed
policy/activity must go ahead, what justification is there to continue with the
change? 
Proposal will improve accessibility for all in Central Elgin.
SECTION 3 CONCLUDING THE IIA
1. No potential negative impacts found for any protected groups.
2. Some potential positive impacts have been identified.
The impacts relate to:
Reducing discrimination, harassment, victimisation or other conduct
prohibited under the Equality Act 2010
X
Promoting equality of opportunity X
Fostering good relations X
3. The proposals interfere with human rights and/or the rights of the
child
X
4. Negative impacts can be mitigated as outlined in Q9. X
5. The negative impacts cannot be fully mitigated but are justified as
Q10.
6. Further consultation with affected groups is needed.
7. It is advised not to go ahead with the proposals.
Decision - Set out the rationale for deciding whether or not to proceed with the
proposed actions: No final decision will be made until the outcome of the proposed
consultation which will inform and evidence the decision-making process.  The IIA will
continue as an evolving document throughout the course of the consultation period. 
Updates will be added for full consideration prior to any final decision.  
Date of Decision:
Sign off and authorisation:
Service
Department
Policy/activity subject to IIA
We have completed the integrated
impact assessment for this policy/activity.
Name: Diane Anderson
Position: Senior Engineer Transportation
Date: 5 May 2025
Page 119

Page 120

FINAL
APPENDIX 5
Authorisation by head of service Name:
Position:
Date:
Permission to publish on website -
Page 120

Page 121

FINAL
APPENDIX 5
INTEGRATED IMPACT ASSESSMENT COVERING
 EQUALITIES & SOCIO ECONOMIC DUTIES
 HUMAN RIGHTS AND RIGHTS OF THE CHILD
DATE UPDATES/EXECUTIVE SUMMARY VERSION DETAILS
Insert Date
(e.g.
03/10/2023)
Add brief notes/highlight which section amended (e.g.
first draft of IIA completed and submitted to SFC
25/10/2023 for consideration; noting that further work
on Stage 2 will be required).
Insert (ShP) Version Info
(when details have been
agreed) (e.g. 5.0
03/10/2023 11:21 AMcL)
03/03/2025 First draft
05/03/2025 Second draft
STAGE 1 - DO I NEED AN INTEGRATED IMPACT ASSESSMENT?
Name of policy or proposal:
Disabled Parking review Elgin Town Centre. The Environmental Services Committee in 2018
asked for a review of disabled parking when North Street reopened.
Is this a Mark X below
New activity, programme or policy?
Change to an existing activity, programme or policy? X
Budget proposal?
Duties: tick the boxes you think apply No Maybe Yes
Equalities: Will your proposal have an impact on groups with
protected characteristics?
Consider the impact of your proposal on people and how they
access your services and information without barriers.
X
Socio-economic
Not every person/family has access to regular income or savings.
Will your proposal have an adverse impact on them
X
Does your proposal impact on the human rights of people? X
Does your proposal impact on the rights of children and young
people
X
Reasoning
Briefly describe your reasoning for the responses given above:
The proposal will alter the location of some disabled parking within the town centre of Elgin. The
town centre alterations are being promoted to improve sustainable travel within Elgin and to assist
with management of the pedestrian areas.
Page 121

Page 122

FINAL
APPENDIX 5
If you have answered “maybe” or “yes” to any of the Stage 1 questions above then
proceed to complete the Stage 2 Integrated Impact Assessment questions below.
If you have answered “no” to the Stage 1 questions above then provide the details below
and submit to [email]
Lead Officer for developing the contract
Other people involved in the screening (this
may be council staff, partners
or others i.e. contractor or community)
Date
Page 122

Page 123

FINAL
APPENDIX 5
STAGE 2: INTEGRATED IMPACT ASSESSMENT
Brief description of the affected service
1. Describe what the service does:
Provides disabled parking spaces, which are both on and off street, to enable Blue Badge holders
greater accessibility to park closer to the facilities and shops within Elgin Town Centre.
2. Who are your main stakeholders? Blue Badge holders and/or any carer for those with any
disability that meets the criteria for a Blue Badge. 
3. What changes as a result of the proposals? Is the service reduced or removed?
It is proposed to remove the existing disabled parking spaces from Commerce Street as part of
the Levelling Up Fund (LUF) and amend times that disabled parking on Thunderton Place can be
accessed. The LUF project is improving sustainable travel links through the town centre which are
currently difficult and to control access to pedestrianised areas which will improve the safety of
vulnerable road users, including those with mobility or other impairments.
Subject to consultation, access to existing pedestrian areas will be managed by raising bollards.
These areas are currently badly abused by many drivers creating road safety issues for
pedestrians. It is proposed to introduce new disabled parking on the High Street to the west of
Batchen Street and at the north end of North Guildry Street. This will replace the 7 existing
spaces on Commerce Street with 8 new ones, which will also be available as an alternative to the
3 spaces on Thunderton Place which would have restricted access at certain times of the day. It is
recognised this is a reduction however the spaces in Commerce Street were badly misused by
able bodied drivers who would go to nearby shops.
4. How will this affect your customers?
The proposed new spaces will be on a level carriageway compared to the Commerce Street
spaces which are on a slope. They are less likely to be misused as the High Street spaces are
very prominent. It is proposed that the High Street spaces will be set back in a layby creating a
safer environment for users. Although the location of spaces has changed, the quality of the
spaces will mean that they can be used by a wider range of Blue Badge Holders with impaired
mobility.
5. Impact on staff providing the service
None.
6. Please indicate if these apply to any of the protected characteristics
Protected groups Potential impacts and considerations
Race
Disability Potential impact – will affect those with disabilities as
set out in current eligibility criteria for Blue Badge
Permits. 
Carers (for elderly, disabled or minors) Potential impact – will affect carers of those with
disabilities, as set out in current eligibility criteria for
Blue Badge Permits 
Sex
Pregnancy and maternity (including
breastfeeding)
Sexual orientation
Age (include children, young people,
midlife and older people)
Potential impact – those with a disability span a range
of age groups.  Those within the older generation have
more mobility issues and the current eligibility criteria
for Blue Badge Permits includes parents of those
under 3 and children.
Religion, and or belief
Gender reassignment
Inequalities arising from socio-
economic differences Page 123

Page 124

FINAL
APPENDIX 5
Human rights
List of convention rights Describe, where applicable, if and how
specific rights are engaged
Article 5: Right to liberty and security
Article 6: Right to a fair trial
Article 8: Right to respect for private and
family life, correspondence and the home
This includes a right to participate in essential
economic, social, cultural and leisure activities. In
some circumstances, public authorities may need
to help you enjoy your right to a private life,
including your ability to participate in society.
Article 10: Freedom of expression
Article 11: Freedom of assembly and
association
Article 12: Right to marry
Article 14: Prohibition of discrimination
(in relation to the convention rights)
Article 1 of Protocol 1: Protection of
property
Article 2 of Protocol 1: Right to education
Article 3 of Protocol 1: Right to free
elections by secret ballot
Children’s Rights and Wellbeing
Relevant articles – UNCRC
Article 2 – Non discrimination Blue Badge holders include children and
carers of children
Article 12 – Respect of the views of the child
Article 3.1 – Best interest of the child
Article 6.2 – Right to survival and
development
Article 23 - Children with a disability A child with a disability has the right, as far as
possible, to independence and to play an
active part in the community with support. 
7. Evidence. What information have you used to make your assessment?
Performance data Usage data as referenced in Committee Report
Internal
consultation
Equalities Officer  
Consultation with
affected groups
The proposals have been discussed with three local Blue Badge
holders who are in regular contact with Officers from within the
Transportation Team. They are generally supportive of the proposals,
in line with the reasoning given in the mitigations set out at Section 9
below.
The proposals have also been discussed with Irena Paterson, who
is the Chair of Moray Disability Form and Vice Convenor of Inclusion
Scotland. In a statement she said “I am happy to see the new spaces
on High Street to mitigate the loss of Commerce Street because of the
slope and constant misuse. I support the alterations.”
Local statistics A study of existing on and off-street disabled parking space usage has
been undertaken and is included as an appendix to this report.
Officers also contacted four other local authorities with similar town
sizes to Elgin to ascertain the number of disabled parking spaces they
provide on / off street. The results are attached as an appendix to the
Page 124

Page 125

FINAL
APPENDIX 5
report. It would appear that Elgin has a high number of spaces
compared to the other sample authorities.
National statistics As Above
Other
8. Evidence gaps
Do you need additional information in order to complete the information in the previous
questions?
9. Mitigating action
Can the impact of the proposed policy/activity be mitigated?  Please explain
Alternative disabled spaces are proposed at the locations to mitigate against the loss of spaces
on Commerce Street and restricted access to Thunderton Place.
Relocation of existing disabled parking bays, from Commerce Street (on the east side of the High
Street pedestrian area) to the west of Batchen street, will:
 provide new, more accessible disabled parking bays for all users regardless of their
disability or condition in terms of gradient (a more level surface) and size.
 spaces will be more prominent with greater visibility, therefore potentially acting as a
deterrent and reducing any potential misuse.
 increase disabled users and overall pedestrian safety, particularly once the traffic flow
change proposed for Commerce Street is in place and the access control measures are
operational.
 satisfy previous requests from area officers for more accessible spaces within the vicinity.
10. Justification
If nothing can be done to reduce the negative impact(s) but the proposed policy/activity must go
ahead, what justification is there to continue with the change? 
While aware the option to relocate the disabled parking bays in the immediate High Street vicinity
could have an impact on those with disabilities and / or their carers, the Council would need to
consider if it would be justified given the mitigations above.  There is no national guidance on the
number of disabled parking bays should be provided on-street but the benchmarking shows Elgin
already has a higher number relative to the sample of other local authorities. 
SECTION 3 CONCLUDING THE IIA
Concluding the IIA
1. No potential negative impacts on any of the protected groups were
found.
2. Some potential negative impacts have been identified.
The impacts relate to:
X
Reducing discrimination, harassment, victimisation or other conduct
prohibited under the Equality Act 2010
X
Promoting equality of opportunity
Fostering good relations
3. The proposals interfere with human rights and/or the rights of the child X
4. Negative impacts can be mitigated as outlined in question 9. X
5. The negative impacts cannot be fully mitigated but are justified as
outlined in question 10.
Page 125

Page 126

FINAL
APPENDIX 5
6. Further consultation with affected groups is needed.
7. It is advised not to go ahead with the proposals.
Decision
Set out the rationale for deciding whether or not to proceed with the proposed actions:
Date of Decision:
Sign off and authorisation:
Service
Department
Policy/activity subject to IIA
We have completed the integrated impact
assessment for this policy/activity.
Name: James Smith
Position: Engineer (Transportation)
Date: 3rd March 2025
Authorisation by head of service Name: Nicola Moss
Position: Head of Environmental and
Commercial Services
Date: 3rd March 2025
Permission to publish on website -
Please return this form to the Equal Opportunities Officer, Chief Executive’s Office.
Page 126

Page 127

Report to: Meeting Date:Economic Development
and Infrastructure
Services Committee
17 June 2025
Report by: Report No:Depute Chief Executive
(Economy, Environment
and Finance)
ECS023/25/EP
Author: Elaine Penny Contact
Email:
elaine.penny@moray.gov.uk
Subject: National Strategy for 20mph
1. PURPOSE
☒ For Decision      ☐  For Information
1.1 The purpose of this report is to update the Committee on the Scottish Government’s
National Strategy for 20mph which aims to ensure all appropriate roads in built-up
areas have a safer speed limit of 20mph by 2025.
1.2 This report is submitted to Committee in terms of Section III (F) (17) of the Council's
Scheme of Administration relating traffic management.
2. SUMMARY
2.1 The Scottish Government has made a commitment that 20mph speed limits will be the
norm on appropriate roads in built up areas. It defines the term ‘appropriate roads’ as
‘all 30mph roads unless after the road assessment a valid reason is provided as to why
they should remain at a speed limit of 30mph’.
2.2 A review was undertaken of all roads in Moray and identified 420km which are currently
subject to a 20 or 30mph limit. These 1627 sections of road have been individually
assessed using the process in Appendix 1 to this report.
2.3 The proposed 20mph limits will be implemented using signs only with a temporary
traffic regulation order (TTRO) which can be introduced with no public consultation
under the legislation. A members briefing was held on 12 May 2025 to introduce the
process and discuss the implications.
3. RECOMMENDATIONS
3.1 It is recommended that Committee:
i) Agrees the process for assessing 20mph limits in Appendix 1; and
Item 10.
Page 127

Page 128

ii) Agrees the consultation and implementation process proposed for the
Temporary Traffic Regulation Order to implement the sign only 20mph
limits for up to 18 months.
Elaine Penny
Engineer (Traffic)
4. BACKGROUND AND CONTEXT
4.1 This report follows the previous report to this committee on 6 September 2022 (Para 7
of the minute refers) and the Information report on 12 November 2024.
4.2 Transport Scotland issued ‘20mph Limits in Scotland - Implementation Guide’ in late
October 2024. It highlights that the setting of the lower speed limit in built-up areas is
underpinned by the safe system approach, which was endorsed by the Council in its
‘Road Safety Plan to 2030’. The Scottish Government is committed to implementing 20
mph speed limits on those roads where it is appropriate to do so by the end of 2025.
4.3 In order that the policy is implemented in each council area, Transport Scotland are
funding a signs only package to implement these 20mph limits.
4.4 The process for assessing each section of existing 30mph road for change to 20mph is
set out in Appendix 1 and is based on Transport Scotland’s Implementation Guide.
4.5 The process includes both place and speed criteria. The place criteria is detailed in 4.6
and the speed criteria in 4.7.
4.6 The process includes the assessment of the road against the following ‘Place Criteria’
which will indicate which 30mph roads are considered appropriate for potential
alteration to 20mph:
A minimum road length for the speed limit is suggested between 400-600 metres. The
length proposed will depend on the conditions at or beyond the end points;
a) Is the road within 100m walk of any educational setting (e.g. primary, secondary,
further and higher education).
b) Does the number of residential and/or retail premises fronting the road (on one
side or both sides) exceed 20 over a continuous road length of between 400 –
600m. Other key building should also be considered such as church, shop or
school.
c) Is the road within 100m walk of any community centre, church, place of worship,
sports facility, any hospital, GP or health facility.
d) Does the composition of the road users imply a lower speed of 20mph which will
improve the conditions or facilities for vulnerable road users and other mode
shift.
e) Will the road environment, surrounding environment, community and quality of
life impact (e.g. severance, noise or air quality) be improved by implementing
20mph speed limits.
4.7 The Speed criteria is based on the existing speed of traffic travelling on a road. where
speeds are:
 At or below 25mph - 20mph limit should be applied
 Between 26 and 30 mph – 20mph may be applied
 Above 30mph – the road should remain 30mph
Page 128

Page 129

4.8 Current speed is important as drivers select their speed due to external factors such as
the roadside environment, the geometry of the road and the level of risk they perceive.
As this is a signs only project then the effect on driver speeds will be limited if there is
no additional change in the road environment. 
4.9 Current speeds will be assessed from a variety of data sources. A licence for the
Agilysis Speed Compliance tool was procured in early 2025 and uses data from a 12-
month period from connected vehicles which have vehicle trackers and sat nav
devices. This data will be used along with specific collected data from traffic counters
on the network and historic information from our own counters.
4.10 The Scottish Government is funding, through a ringfenced grant from Transport
Scotland, the implementation of sign only 20mph limits but will not fund additional
measures to slow traffic at locations which do not meet the speed criteria. It is
proposed that 20mph limits are only introduced in Moray where both the place criteria
and the speed criteria are met. The process is given in Appendix 1.
4.11 The proposal is to implement the 20mph limits using signs only with a Temporary
Traffic Regulation Order (TTRO) which can be introduced with limited consultation
under the legislation and lasts up to 18 months (section 88 of the Road Traffic
Regulation Act 1984 refers). A members briefing was held on 12 May 2025 to introduce
the process and discuss the implications. The change from Experimental Traffic
Regulation Order, as reported previously, is as a result of the updated guidance from
Transport Scotland on 31 October 2024.
4.12 However, despite there being no requirement for consultation, there will be information
on the council website which will have an interactive map and list of roads subject to
this TTRO. The TTRO will run for 18 months from its implementation date, which is the
maximum available and the effects on speed will be monitored during this time. The
implementation date will be determined by the physical works required in erecting all
the signs to make the order legal but is anticipated to be late Autumn 2025.
4.13 During these 18 months a permanent Traffic Regulation Order process will be pursued
for the 20mph limits, with any appropriate changes made should results of further
speed surveys indicate that it still does not meet the speed criteria.
4.14 Additionally, consultations will take place with statutory consultees, namely: the
Emergency services, Freight Transport Association, local bus service providers, the
Local Road Safety Champions, the JCC / Community Councils. Information will also be
available to the general public through social media and the press.
4.15 Currently roads in Scotland which have a system of carriageway lighting not more than
185m apart which are not an A or a B road are defined as a ‘restricted road’ under the
definition in the Road Traffic Regulation Act 1984 Section 82 (1) (b) and in turn defined
in The Restricted Roads (Classification or Type) (Scotland) Regulations 1985. A
‘restricted road’ is subject to a speed limit of 30mph. A and B roads which have a
30mph limit on them currently already have a Traffic Regulation Order (TRO) making
them 30mph. Any changes to these roads will require the current TRO to be revoked
temporarily and included in the 20mph Temporary Traffic Regulation Order.
4.16 Work associated with erecting the signs and determining their location will be
contracted externally along with the legal process due to limits to staff resources.
Page 129

Page 130

4.17 Signs will mainly be erected on existing lamp posts and sign poles replacing 30mph
limit signs where appropriate. There will be a requirement for ‘20mph repeater’ signs to
be erected on lampposts within the 20mph area in addition to the ones introducing the
limit. The exact numbers of these signs are not currently known but likely to be
between 4000 to 5000.
4.18 Currently of the 52 schools in Moray, 33 have part time speed limits, many of which will
be incorporated into a full time 20mph limit with the school signs being replaced by
school warning signs where appropriate. 6 already have full time 20mph limits and will
remain so. The other 13 schools will be subject to the criteria presented in Appendix 1.
4.19 The timeline for the whole process is proposed to be:
 To end June 2025 – determine which roads will be included in the TTRO for sign
only 20mph; procure additional speed surveys where necessary; prepare
mapping for website; procure dashboard for speed information.
 June to September 2025 – Engage legal consultant to prepare TTRO; engage
Civil Engineering consultant to prepare Schedule for TTRO, survey sign
location, prepare contract documents for sign supply and erection.
 September 2025 – procurement and legal processes running.
 October /November 2025 – erect signs and implement TTRO on appropriate
roads.
5. PROPOSALS
5.1 To make the website live and start the consultation with the statutory consultees after
this committee.
5.2 To implement a Temporary Traffic Regulation Order introducing a 20mph limit on roads
in Moray which are currently 30mph where they meet both the place and speed criteria
using the process in Appendix 1.
5.3 Erect signs to make the orders legal for up to 18 months and monitor speeds during
this period.
6. SUMMARY OF IMPLICATIONS
6.1 The table below shows whether risks and implications apply if the recommendations
are agreed:
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement
Plan)
X
Policy and Legal X
Financial X
Risk X
Staffing X
Best Value and Transformation X
Property X
Information Communications Technology/Digital X
Equalities. Social Inclusion and Economic Impact X
Climate Change and Biodiversity Impact X
Page 130

Page 131

6.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans.
a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following
Council Plan strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☒ Improving wellbeing of our population
6.3 Policy and Legal
The Council has the authority under the Road Traffic Regulation Act 1984 Section 88 to
introduce temporary Speed Limit Orders. The proposals and consultation process set
out in this report complies with the obligations of this act. If the council wishes to make
these orders permanent a new process under the Local Authorities’ Traffic Orders
(Procedure) (Scotland) Regulations 1999 which sets out the procedure relating to
consultation and the making of such permanent orders, will be required.
6.4 Financial
There are no capital implications of providing the signs associated with this project as
the installation of all signing will be funded by Scottish Government. However, there
will be an ongoing maintenance liability as there will be additional signs over the
current asset base
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend
this Year
Virement
From
Other
Comment
s
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments
Road
Maintenance
Signs
and
Road
marking
s
2026/27 £25,000 This
estimate is
based on up
to 5% of
sign
replacement
due to
Page 131

Page 132

damage,
loss etc
6.5 Risk
Reputational risk to the council if not seen to be implementing Government policy
timeously.
6.6 Staffing
There are limited staffing resources in-house to implement such a large project. The
initial assessment has been done in-house, but the drafting of the Traffic Regulation
Order and the legal process will be outsourced to a Legal consultant. Measuring of the
order schedule and surveys of sign location and drafting of the contract for providing
the signs will be outsourced to a Civil Engineering consultant. The signing will be
erected through an engineering contract. All these additional costs will be covered by
the ring-fenced grant.
6.7 Best Value and Transformation
None.
6.8 Property
None.
6.9 Information Communications/Technology/Digital
None.
6.10 Equalities, Social Inclusion and Economic Impact
IIA is included in Appendix 2.
6.11 Climate Change and Biodiversity Impacts
This scheme will contribute to addressing climate change by making active travel
journeys safer and more attractive. A modal shift from car to active travel for short
journeys in urban areas will help to reduce greenhouse gas emissions.
7. CONSULTATION
7.1 This report has been prepared in consultation with Depute Chief Executive (Economy
Environment and Finance), Head of Environmental and Commercial Services, Chief
Financial Officer, Legal Services Manager, Equal Opportunities Officer,  Committee
Services Officer (C O’Connor), Sustainable Travel Officer, Principal Climate Change
Officer and any comments made have been incorporated into the report.
8. BACKGROUND PAPERS
8.1 Report to Economic Development and Infrastructure Services Committee - 6
September 2022 - National Strategy for 20mph and Appendix 1
Information Report to Economic Development and Infrastructure Services Committee
on 12 November 2024 - National Strategy for 20mph
8.2 https://www.transport.gov.scot/media/3yxfd5tp/the-implementation-guide-for-20-mph-
speed-limits-in-scotland.pdf
Page 132

Page 133

DRAFT
APPENDIX 1
Speed Limit Assessment 20mph roll out for national strategy
Place criteria
Is the road within 100m walk of any
educational setting (for example; primary,
secondary, further and higher education)?
YES NO
Does the number of residential or retail premises fronting
the road (on one or both sides) exceed 20 over a
continuous road length of between 400m and 600m?
Is the road within 100m walk of any community
centre, church, place of worship, sports facility,
any hospital, GP or health centre?
YES NO
YES NO
What is the existing mean
speed measurement? Is it
suitable for 20mph with
signage alone?
Does the make-up of road users suggest a
lower speed of 20mph will improve the
conditions and facilities for vulnerable road
users and other mode shift (consider existing
and potential)
YES NO
At or below 25mph
Between 26-30mph
Above 30mph
NO
NO YES
YES 20mph limit should be applied
**20mph limit should be applied,
but speed reducing features may be
required after future reassessment
Speed reducing features SHOULD
be introduced/proposed along with
20mph limit. A section of 30mph
may be required to precede the new
20mph.
Consult with Police to
present
findings/proposals.
Is the road Class C, Unclassified or
private?
YES NO
Is there a system of 3 or
more street lights not more
than 185m apart?
Road will be
class A or B
YES NO
The existing TRO must be
revoked.
A new TRO is required for the
20mph speed limit
Options:
 Applied under §9 of RTRA as
Experimental order (18months)
 applied under §84 RTRA at
Permanent order
 applied under §88 RTRA as
temporary order (18months)
20mph speed limit signs, including
REPEATERS, can be erected.
The road is
classed as a
Restricted Road?
Are additional speed
reduction measures required
YES
NO
Are the visual aspects of the
road environment conducive
towards a 20mph limit?
NO
YES
*Road should remain at 30mph
Police supportive
of proposals
Police unsupportive
of proposals
* Refer proposal to committee,
reporting comments from Police.
Recommendations may still be to
proceed despite Police comments. 
NOTES
* Where the findings are referred back to committee, the
process will be resumed at the appropriate point, depending
on the committee decision.
**Any speed reducing features required will need to be
funded by the Council as they are not included in the national
strategy.
* Consider what additional speed
reductions measures are required
and assess costs. Road should
remain at 30mph. Additional
features are not funded through the
national programme
Does the road have a current speed limit of
30mph?
YES NO
National Strategy for 20mph
limits does not apply to existing
40/50mph speed limits
*Road should
remain at 30mph
Page 133

Page 134

SPFINANCE-565096732-34 06/06/2025 11:40
APPENDIX 2
INTEGRATED IMPACT ASSESSMENT COVERING
 EQUALITIES & SOCIO ECONOMIC DUTIES
 HUMAN RIGHTS AND RIGHTS OF THE CHILD
DATE UPDATES/EXECUTIVE SUMMARY VERSION DETAILS
Insert Date
(e.g.
03/10/2023)
Add brief notes/highlight which section amended (e.g.
first draft of IIA completed and submitted to SFC
25/10/2023 for consideration; noting that further work
on Stage 2 will be required).
Insert (ShP) Version Info
(when details have been
agreed) (e.g. 5.0 03/10/2023
11:21 AMcL)
05/05/2025 1st Draft for ED&I Committee on 17 June 2025
STAGE 1 - DO I NEED AN INTEGRATED IMPACT ASSESSMENT?
Name of policy or proposal:
National Strategy for 20mph Speed Limits on appropriate roads in built up areas.
Is this a Mark X below
New activity, programme or policy?
Change to an existing activity, programme or policy? X
Budget proposal?
Duties: tick the boxes you think apply No Maybe Yes
Equalities: Will your proposal have an impact on groups with
protected characteristics?
Consider the impact of your proposal on people and how they
access your services and information without barriers.
X
Socio-economic
Not every person/family has access to regular income or
savings. Will your proposal have an adverse impact on them
X
Does your proposal impact on the human rights of people? X
Does your proposal impact on the rights of children and
young people
X
Reasoning - Briefly describe your reasoning for the responses given above:
Transport Scotland are seeking all appropriate roads within built up areas to have a
20mph speed limit by 2025. The lower vehicle speeds in built up areas can support
travel by pedestrians and cyclists, in particular young persons, older persons and
disabled persons.
If you have answered “maybe” or “yes” to any of the Stage 1 questions above,
then proceed to complete the Stage 2 Integrated Impact Assessment questions
below.
If you have answered “no” to the Stage 1 questions above, then provide the
details below and submit to [email]
Lead Officer for developing the contract
Other people involved in the screening
(this may be council staff, partners
or others i.e. contractor or community)
Page 134

Page 135

SPFINANCE-565096732-34 06/06/2025 11:40
APPENDIX 2
Date
STAGE 2: INTEGRATED IMPACT ASSESSMENT
Brief description of the affected service
1. Describe what the service does:
The Scottish Government has made a commitment that 20mph speed limits will be the
norm on appropriate roads in built up areas. It defines the term ‘appropriate roads’ as ‘all
30mph roads unless after the road assessment a valid reason is provided as to why they
should remain at a speed limit of 30mph’
2. Who are your main stakeholders?
Members of the public, visitors, workers, businesses, and residents travelling on roads
within the built-up areas of Moray.
3. What changes as a result of the proposals? Is the service reduced or removed?
The proposed changes will lower speed limits on appropriate roads, creating a safer
environment for all pedestrians and cyclists, but in particular children, older persons,
those with mobility issues and disabled persons.
4. How will this affect your customers?
Increased accessibility will support and encourage community inclusion for all groups. 
Pedestrians and cyclists will benefit from the lower speeds, making it easier to cross a
road and making the experience of travelling more pleasant. Pedestrians and cyclist will
feel and be safer on the roads with lower speed limits.
5. Impact on staff providing the service
None.
6. Please indicate if these apply to any of the protected characteristics
Protected groups Potential impacts and considerations
Race
Disability Positive Impact on those with a range of disabilities.
Carers (for elderly, disabled or
minors)
Positive impact on carers of those with a range of
disabilities.
Sex
Pregnancy and maternity (including
breastfeeding)
Sexual orientation
Age (include children, young
people, midlife and older people)
Positive impact. Those with a disability span a range of
age groups.  Those within the older generation have
more mobility issues.
Religion, and or belief
Gender reassignment
Page 135

Page 136

SPFINANCE-565096732-34 06/06/2025 11:40
APPENDIX 2
Inequalities arising from socio-
economic differences
Human rights
List of convention rights Describe, where applicable, if and how specific
rights are engaged
Article 5: Right to liberty and
security
Article 6: Right to a fair trial
Article 8: Right to respect for
private and family life,
correspondence and the home
Article 10: Freedom of expression
Article 11: Freedom of assembly
and association
Article 12: Right to marry
Article 14: Prohibition of
discrimination (in relation to the
convention rights)
Article 1 of Protocol 1: Protection
of property
Article 2 of Protocol 1: Right to
education
Article 3 of Protocol 1: Right to free
elections by secret ballot
Children’s Rights and Wellbeing
Relevant articles – UNCRC
Article 2 – Non discrimination
Article 3.1 – Best interest of the child
Article 6.2 – Right to survival and
development
Article 12 – Respect of the views of the child
Article 23 – Children with a disability
7. Evidence. What information have you used to make your assessment?
Performance data
Internal
consultation
Equalities Officer
Consultation with
affected groups
Information will be provided to communities prior to the
implementation of the temporary speed limits. To make the speed
limits permanent there is a statutory consultation process.
Local statistics Vehicle speeds from Council data and from connected vehicle
data.
Page 136

Page 137

SPFINANCE-565096732-34 06/06/2025 11:40
APPENDIX 2
National
statistics
Other
8. Evidence gaps
Do you need additional information in order to complete the information in the
previous questions?
9. Mitigating action
Can the impact of the proposed policy/activity be mitigated?  Please explain
N/A - No negative impacts identified.  Lower speed limit in built-up areas promotes
enhanced inclusion, accessibility and safety for the communities of Moray.  .
10. Justification
If nothing can be done to reduce the negative impact(s) but the proposed
policy/activity must go ahead, what justification is there to continue with the
change? 
N/A
SECTION 3 CONCLUDING THE IIA
1. No potential negative impacts found for any protected groups.
2. Some potential positive impacts have been identified.
The impacts relate to:
Reducing discrimination, harassment, victimisation or other conduct
prohibited under the Equality Act 2010
X
Promoting equality of opportunity X
Fostering good relations X
3. The proposals interfere with human rights and/or the rights of the
child
4. Negative impacts can be mitigated as outlined in Q9.
5. The negative impacts cannot be fully mitigated but are justified as
Q10.
6. Further consultation with affected groups is needed.
7. It is advised not to go ahead with the proposals.
Decision - Set out the rationale for deciding whether or not to proceed with the
proposed actions: No final decision will be made until the outcome of the proposed
consultation which will inform and evidence the decision-making process.  The IIA will
continue as an evolving document throughout the course of the consultation period. 
Updates will be added for full consideration prior to any final decision.  
Date of Decision:
Sign off and authorisation:
Page 137

Page 138

SPFINANCE-565096732-34 06/06/2025 11:40
APPENDIX 2
Service Transportation
Department Economic and Commercial Service
Policy/activity subject to IIA
We have completed the integrated
impact assessment for this policy/activity.
Name: Elaine Penny
Position: Engineer Transportation
Date: 12 May 2025
Authorisation by head of service Name:
Position:
Date:
Permission to publish on website -
Page 138

Page 139

Report to: Meeting Date:Economic Development
and Infrastructure
Services Committee
17 June 2025
Report by: Report No:Depute Chief Executive
(Economy Environment
and Finance)
EGD011/25/RL/SW
Author: Rod Lovie / Sophie Ward Contact
Email:
Rod.Lovie@moray.gov.uk
Sophie.Ward@moray.gov.uk
Subject: Nature Restoration Fund 2025-26
1. PURPOSE
☒ For Decision      ☐  For Information
1.1 The purpose of this report is to update members on the activities of the Nature
Restoration Fund grant and agree the creation of a new temporary part-time post to
support its delivery.
1.2 This report is submitted to Committee in terms of Section III (F) (13) of the Council’s
Scheme of Administration relating to matters regarding environmental protection.
2. SUMMARY
2.1 Moray Council has received £258,000 from the Scottish Government’s Nature
Restoration fund direct grant allocation to local authorities to support new, or to
enhance existing, approaches to restoring biodiversity.
2.2 Because this amount includes two years’ allocations at once and includes a new
revenue element, the report asks for delegated authority to deliver the spend over a
longer period and to appoint a new temporary position using the funds to address the
lack of capacity within existing staff workloads to effectively deliver the grant and
maximise the benefits.
3. RECOMMENDATIONS –
3.1 It is recommended that Committee:
i) Note the receipt of £258,000 from the Scottish Government’s Nature
Restoration Fund direct grant in 2025-26;
ii) Approve the creation of a 2 year temporary part-time post to support
delivery of the Nature Restoration Fund grant; and
Item 11.
Page 139

Page 140

iii) Agree to continue to delegate authority to the Acting Head of Economic
Growth & Development to make decisions on the spend of the remaining
Nature Restoration Fund grant, and direct grants for biodiversity that
may extend or replace it going forward.
Rod Lovie, Principal Climate Change Strategy Officer
Sophie Ward, Climate Change Strategy Officer
4. BACKGROUND AND CONTEXT
4.1 The Scottish Government’s Nature Restoration Fund (NRF) was introduced in 2021 in
response to the biodiversity crisis. On 2 February 2023 Moray Council formally
recognised that we are facing a nature emergency (para 9 of the minute refers)
recognising the urgent need to aid nature recovery and restoration. The purpose of the
fund is to support actions that help nature recover by enhancing biodiversity and local
ecosystems and/or using nature-based solutions to mitigate and adapt to the climate
emergency and its impacts.
4.2 Over the last four years Scottish local authorities have each received a direct capital
grant, with many positive outcomes delivered for people and nature in Moray during
this period.     The Head of Economic Growth and Development was granted authority
at this committee on 15 November 2022 to make future project allocation decisions,
subject to annual reporting (para 9 of the minute refers).
Due to the seasonal nature of the work, and delivery relying on existing staff capacity,
delegated authority has enabled more efficient and effective project delivery.
4.3 A summary of the main actions taken so far are below.
The Council’s action for pollinators: living lawns, wildflower meadows, reducing
the use of glyphosate-based herbicides
 Cut and collection machinery for meadow management.
 Seasonal staff to support maintenance and creation of almost 40 wildflower and
living lawn sites across Aberlour, Buckie, Craigellachie, Dyke, Elgin, Fogwatt,
Forres, Garmouth, Kingston, Lossiemouth, Rafford and Rothes.
 Planting to deliver the Mannachie Park masterplan.
Biodiversity enhancement of key nature sites (Millbuies, the Wards and Elgin
Oakwood)
 Millbuies woodland: Woodland management plan produced; woodland
restructuring to support biodiversity and ecosystem resilience; understory
planting; bird and bat box installation.
 The Wards Wildlife Site: Management plan produced; new wader scrapes; pond
restoration; wildflower planting, swift box installation at Cedarwood.
 Elgin Oakwood: Management plan produced; invasive species removal within
SSSI; acorn collection and planting out of new oaks; tree protector removal.
Invasive Non-Native Species removal (e.g. giant hogweed and Japanese
knotweed along Findhorn, Lossie and Spey rivers)
 Grant contributions to the local Scottish Invasive Species Initiative projects
(hosted by the rivers trusts) to support delivery of the strategic, landscape scale
work across Moray.
Page 140

Page 141

Actions arising from emerging habitat and species data and the woodland
strategy
 Spatial opportunity mapping of potential Nature Networks to connect protected
sites and create urban-rural wildlife corridors. This work has drawn input from a
range of stakeholders, is facilitating regional collaboration from across different
sectors and is informing the Local Development Plan 2027 and forthcoming
Biodiversity Strategy (within which the Nature Network will be embedded). 
 Addition of Elgin Oakwood as a priority site for restoration
 Collaboration with Wild Things environmental education charity to deliver actions
across all three nature sites, creating opportunities for forestry and nature-based
skills development and supporting wellbeing through nature connection. This
work has engaged people of all ages from across Moray.
Rain gardens at schools and council buildings for storm water management
 Clovenside cemetery rain garden in year one.
 No others progressed through NRF (Transportation installed a rain garden at
Forres Academy through a different funding stream).
School conservation projects
 School ground enhancements funded for 12 schools in year one.
Community led nature projects
 Moray Climate Action Network (Moray CAN, hosted by tsiMORAY) distributed
small grants (up to £2,000 for community groups and £200 for individuals) for
projects delivering NRF criteria.
4.4 The NRF grant has been uncertain year on year. In year three, additional monies were
provided for the development of Nature Networks and in year four the full fund was
removed from nature restoration and redirected to the local government pay deal, with
no clear commitment that it would be returned this year.
4.5 The Council has now received an allocation of £258,000 for 2025-26, incorporating the
replacement of £122,000 NRF funding redirected in 2024-25. Following feedback from
local authorities, £75,000 of the new grant is being provided as revenue, recognising
the challenges faced by existing staff to fully deliver the grant. The capital funds are
being delivered as part of the General Capital Grant as previously. 
The inclusion of revenue is welcomed by officers, as officers have shared wider local
authority concerns about the ability to co-ordinate spending of the grant within existing
workloads, despite biodiversity enhancement plans being either in place or in
development for a number of sites. The grant has been extremely valuable,
progressing nature conservation and social opportunities for improving wellbeing and
connection to nature that would otherwise have not been possible.
5. PROPOSALS
5.1 Considering the uncertain future of the fund, and the difficulties outlined in the report to
this Committee on 15 November 2022 (para 9 of the minute refers), it is recommended
that delegated authority to the Acting Head of Economic Growth & Development be
extended for this and future grants for the same purpose, where the criteria does not
change substantially.
Page 141

Page 142

5.2 The 2025-26 grant allocation is greater than anticipated as it equates to two years
funding. Therefore it is likely that part of the fund allocation would be carried forward to
2026-27 and 2027-28 to deliver actions within the same project areas outlined in 4.5 in
order to maximise the biodiversity and social benefits to be achieved.
5.3 Should the next Scottish Government not renew the commitment to the NRF then this
will be the final year the council receives a direct grant. Extending the period when this
grant is spent allows time to continue to invest in biodiversity while also identifying
alternative approaches to progress nature restoration under the council’s various
statutory duties and following the production of the council’s first Biodiversity Strategy,
the draft of which is scheduled for August 2025.
5.4 New responsibilities for the council set out in the Scottish Biodiversity Delivery Plan
include developing Nature Networks, nature positive management plans for all public
greenspaces, green/blue infrastructure in all active travel infrastructure projects and
promoting biodiverse sustainable drainage systems. The Natural Environment
(Scotland) Bill proposes to introduce national biodiversity targets.
5.5 For noting, the project areas in which the grant will be delivered remain aligned with
those outlined in the 15 November 2022 report. The below activities are illustrative of
the work likely to progress, but the nature of work means that opportunities may
emerge as projects and partnerships evolve.
School conservation projects
 The council is working in partnership with Wild Things and Nature4Health to
deliver a schools program. The funding will allow us to work with up to 10
schools this year, and approximately 10 schools next year to support them to
deliver plans for biodiversity / nature-based solutions that will enrich the learning
and play environment. The plans will inform spend from the NRF and may
include tree pits where drainage is poor, hedges, trees, ponds etc.
 Schools are being prioritised by factors including; larger schools, high Scottish
Index of Multiple Deprivation score, high climate risk (heat/flood), nature
depleted grounds. East End, New Elgin, Lhanbryde, St Gerardines, Pilmuir,
Greenwards are being supported to develop their plans this term, with more
joining next term.
 This work contributes to actions from Learning for Sustainability, Learning Estate
Strategy, Curriculum for Excellence in outdoor Learning, Woodland and Forestry
Strategy, Climate Change Strategy, Natural Capital (offsetting) strategy, Nature
Networks, and corporate priorities relating to action on poverty, inequality,
educational outcomes and health/ wellbeing. These interconnections, along with
learnings from the pilot schools, will be shared with all Head Teachers to
encourage schools to engage with this project and other resources available to
support rich outdoor learning experiences.
Nature Sites
 Progress actions for the three sites with management plans in place through the
NRF; Millbuies, the Wards and Elgin Oakwood.
 Ongoing conservation activities include selective felling, invasive species
removal, native planting, wetland management
Wildflower programme and nature positive management of council land 
 To improve the ecological condition of existing wildflower sites and introduce
new biodiverse planting.
Page 142

Page 143

Community led nature projects
 Seed funding for communities to deliver biodiversity projects matching NRF
criteria delivered in partnership with Moray CAN.
Invasive Non-Native Species removal
 Grant contribution to the strategic, landscape scale work of the local Scottish
Invasive Species Initiative projects across Moray.
5.6 Much of the larger spend to date has covered consultant fees to develop management
plans, but recent workstreams including Nature Networks, natural capital, Woodland
and Forestry Strategy and climate adaptation have identified council land such as
parks and housing land, and especially school grounds as priority spaces for increasing
biodiversity and people’s connection to nature. While activities will generally be carried
out by contractors/ third sector partners, co-ordination of these, liaison with council
teams and community engagement cannot be contracted out. There is very limited
capacity in the council to deliver this work and this is also an issue for other councils.
This is acknowledged and reflected in Scot Government’s decision to split the funding
this year between capital and revenue.
5.7 Owing to a lack of capacity within the existing staffing resource, it is recommended that
the council creates a new temporary, part-time, post of Assistant Project Officer -
Nature Networks to support co-ordination of the NRF project delivery.  To align with
funding from the NRF it is proposed that the post be a part-time (29 hours per week)
Grade 7 post for a fixed period of two years at a cost of £73,141including inflation and
oncosts of 20%. The postholder would assist the Strategic Planning and Development
Team to develop and deliver Nature Networks and open space projects which improve
biodiversity. The Assistant Project Officer will deliver projects on Moray Council land,
focusing on schools and urban Nature Networks, work with landowners and
communities to deliver nature restoration and biodiversity projects throughout Moray.
The role includes the provision of advice and support to project team colleagues and
service contacts on aspects of the project.
6. SUMMARY OF IMPLICATIONS
6.1 The table below shows whether risks and implications apply if the recommendations
are agreed:
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement
Plan)
x
Policy and Legal x
Financial x
Risk x
Staffing x
Best Value and Transformation x
Property x
Information Communications Technology/Digital x
Equalities. Social Inclusion and Economic Impact x
Climate Change and Biodiversity Impact x
Page 143

Page 144

6.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans.
a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following
Council Plan strategic priorities:
☒ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☒ Improving wellbeing of our population
6.3 Policy and Legal
The Council has a statutory duty under the Nature Conservation (Scotland) Act 2004 to
further the conservation of biodiversity when carrying out its duties. Actions within the
Scottish Biodiversity Delivery Plan expand responsibilities for public bodies to manage
land with positive outcomes for nature. The Natural Environment (Scotland) Bill
proposes to introduce national biodiversity targets.
The Council’s Climate Change Strategy aims to ‘Work to retain, protect and enhance
biodiversity across Moray’ and NPF4 requires that the council produce and support the
delivery of a Nature Network.
Some of the other policies and legislation relating to nature restoration that are
particularly relevant to this report include;
 Nature Conservation (Scotland) Act 2004
 Wildlife and Natural Environment (Scotland) Act 2011
 Scottish Biodiversity Strategy to 2045
 National Planning Framework 4
 Pollinator Strategy for Scotland
 Climate Change (Scotland) Act 2009 and 2019
 Curriculum for Excellence through Outdoor Learning
 Moray Woodland and Forestry Strategy
 Scotland’s Draft National Adaptation Plan 3
 Scotland's National Strategy for Economic Transformation
6.4 Financial
The Scottish Government is providing £258,000 direct grant to support new, or to
enhance existing, approaches to restoring biodiversity. This includes £75,000 being
provided as revenue of which £73,141 will be spent to create a temporary, part-time,
post of Assistant Project Officer - Nature Networks for a fixed period of two years. This
report details how the grant will be spent to maximise benefit for the Council, residents
and nature of Moray.
One off Costs:
Page 144

Page 145

Service
Area
Budget Budge
t Years
Proposed
Spend this Year
Viremen
t From
Other
Comment
s
Economic
Growth &
Developmen
t
£258,00
0
2025-
27
£142,000 N/A
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable
)
Other
Comment
s
6.5 Risk
If the additional post is not approved there is a risk that the grant may not be delivered
efficiently or provide the most meaningful positive impact.
Ongoing maintenance implications for all projects are carefully considered to reduce
the risk to Open Spaces should external funding not be available in future.
There is also a reputational risk should the council not take meaningful action following
its declaration of a Nature Emergency.
6.6 Staffing
A new part-time post, proposed at Grade 7 will be created for a fixed term of two years
which will be funded by the revenue element of the Nature Restoration Fund.
There will be a continuing requirement for staff from several services including
Strategic Planning & Development, Open Spaces, Housing & Property and Education
to work as part of a project team to support the delivery of the biodiversity duties.
6.7 Best Value and Transformation
Flexible spending of grant and the creation of additional capacity through the new
temporary post will allow best value spend of the grant while also allowing maximum
opportunities to involve community and partners in the work. This will help the council
to promote and deliver its sustainable development duties.
6.8 Property
The proposal aims to improve council land for biodiversity and public access to nature.
6.9 Information Communications/Technology/Digital
Nature Networks and community project mapping will be an online resource, the quality
of community engagement with this will be dependent on the proposal to create a new
post.
6.10 Equalities, Social Inclusion and Economic Impact
Lack of access to the natural environment has evidenced links to poverty, inequality
and poor education, wellbeing and health outcomes. The proposals within the report
Page 145

Page 146

will contribute to improving these through prioritising work in communities with high
Scottish Index of Multiple Deprivation (SIMD) profiles.
6.11 Climate Change and Biodiversity Impacts
The proposals chiefly aim to improve biodiversity and people’s connection to nature,
both of which provide direct positive impacts on climate. 
7. CONSULTATION
7.1 This report has been prepared in consultation with The Depute Chief Executive
(Economy, Environment and Finance), Acting Head of Growth, Planning & Climate,
Environmental Protection Manager, Open Spaces Manager, Chief Education Officer,
Programme Manager (Learning Estate), Legal Services Manager, Chief Financial
Officer, Human Resources Manager and Caroline O’Connor, Committee Services
Officer and any comments made have been incorporated into the report
8. BACKGROUND PAPERS
8.1 Biodiversity Duty Report 2021-23 14 November 2023 Item 8
Information Report – Nature Restoration Fund 2023-24 Update 3 September 2024
Page 146

Page 147

Report to: Meeting Date:Economic
Development and
Infrastructure Services
Committee
17 June 2025
Report by: Report No:Depute Chief Executive
(Economy,
Environment and
Finance)
ECS022/25/DA
Author: Diane Anderson Contact Email: diane.anderson@moray.gov.uk
Subject: Review of Arrangements for Furniture on Footpaths
1. PURPOSE
☐ For Decision      ☒  For Information
1.1 The purpose of this report is to provide a review of the permission process for the
placement of furniture (tables and chairs) and non-furniture items on the public footway
for restaurants, cafes, and public houses.
1.2 This report is submitted to Committee in terms of Section III (F) (17) of the Council’s
Scheme of Administration relating to traffic management.
2. SUMMARY
2.1 This report provides information on the number of applications made since October
2023 for the placement of tables and chairs, and other associated items, on footways
to enable outdoor hospitality as requested at the Council meeting of 25 October 2023.
Diane Anderson
Senior Engineer Transportation
3. BACKGROUND AND CONTEXT
3.1 The appropriate use of the public realm for outdoor eating and drinking is one of the
ways which hospitality businesses can be supported and visitors encouraged to
Moray’s town centres and coastal settlements. The placement of furniture and other
items to enable outdoor dining on footways outside premises no longer requires
planning permission under changes to Permitted Development Rights in Scotland on
31 March 2023. However, permission remains conditional on meeting the Roads
Authority’s requirements associated with Section 59 of the Roads (Scotland) Act 1984.
Page 147

Page 148

3.2 Section 59 relates to the control of obstructions in roads and states that:
“…nothing shall be placed or deposited in a road so as to cause an obstruction except
with the roads authority’s consent in writing and in accordance with any reasonable
conditions which they think fit to attach to the consent…”.
3.3 A process to apply for permission to site furniture and other associated items on the
footway to enable outdoor dining, along with associated guidance for businesses, was
developed and approved at the Council meeting on 25 October 2023. At that meeting it
was requested that after 18 months details of applications made would be reported to
this committee (Para 12 of the minutes refers).
4. NUMBER OF APPLICATIONS
4.1 There have been two applications made since October 2023. The first application was
from a business in central Elgin. However, the area that they were seeking to use was
not part of the public road. Therefore, an officer visited the applicant to provide advice
on the siting of the furniture so that it did not cause an obstruction to pedestrians.
There was no charge made for this advice.
4.2 The second application was for a business on Forres High Street. This business has
been granted permission which will be in place until April 2026.
4.3 It should be noted that there are a number of businesses across Moray which have
planning permission for outdoor hospitality, granted prior to the changes in permitted
development rights. These businesses are not required to seek permission from the
Roads Authority and therefore do not need to make an annual application.
5. SUMMARY OF IMPLICATIONS
5.1 The table below shows whether risks and implications apply if the recommendations
are agreed:
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement
Plan)
X
Policy and Legal X
Financial X
Risk X
Staffing X
Best Value and Transformation X
Property X
Information Communications Technology/Digital           X
Equalities. Social Inclusion and Economic Impact           X
Climate Change and Biodiversity Impact X
5.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans.
a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following
Council Plan strategic priorities:
Page 148

Page 149

☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population
5.3 Policy and Legal
The Council requires businesses seeking to use the public footway for outdoor
hospitality since October 2023 to apply for permission on an annual basis. Permission
is granted through the use of Section 59 of the Roads (Scotland) Act 1984. Premises
licenced for the sale/consumption of alcohol must extend their alcohol licence to cover
the proposed outdoor area.
5.4 Financial
There are no financial implications as the annual application fee covers the costs of
processing the applications and inspections.
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend
this Year
Virement
From
Other
Comment
s
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable
)
Other
Comment
s
5.5 Risk
None.
5.6 Staffing
None.
5.7 Best Value and Transformation
None.
5.8 Property
None.
5.9 Information Communications/Technology/Digital
None.
Page 149

Page 150

5.10 Equalities, Social Inclusion and Economic Impact
In practical terms there are no changes to the impacts of the council’s position on
protected characteristics. The guidance regarding disabled access and safety will
continue as per the current arrangements.
5.11 Climate Change and Biodiversity Impacts
None.
6. CONSULTATION
6.1 This report has been prepared in consultation with Depute Chief Executive (Economy
Environment and Finance), Head of Environmental and Commercial Services, Chief
Financial Officer, Legal Services Manager, Equal Opportunities Officer and Caroline
O’Connor, Committee Services Officer and any comments made have been
incorporated into the report.
7. BACKGROUND PAPERS
7.1 Report to Moray Council 25 October 2023 - Moray Council Permission for Hospitality
Businesses to Place Furniture and Non Furniture on Public Footways and  Appendix 1
and  Appendix 2
Moray Council Website - Tables and Chairs Guidance and Permit Application for Tables
and Chairs
Page 150

Page 151

Report
to:
Economic
Development and
Infrastructure
Services Committee 
Meeting
Date:  
17 June 2025  
Report
by:
Depute Chief
Executive (Economy,
Environment and
Finance) 
Report No: EGD014/25/AC
Author: Amy Cruickshank Contact email: amy.cruickshank@moray.gov.uk    
Subject: Moray Pathways Local Employability Partnership Annual Report 
1.  PURPOSE 
☐ For Decision      ☒  For Information 
1.1  The purpose of this report is to note the progress made in 2024/2025 across the
partnership and plans for future delivery and provision. 
1.2  This report is submitted to Committee in terms of Section II (A) (2) of the Council's
Scheme of Administration relating to long-term financial plans. 
2.  SUMMARY  
2.1  This report provides information on progress made during 2024/2025 and plans for
future delivery and provision.  Moray Pathways is a local employability partnership
sitting in the community planning landscape that involves various organisations and
local employers dedicated to assisting individuals needing additional help to secure
jobs.  The total funding for 2024/2025 included significant contributions from the
Scottish Government and UK Shared Prosperity Funding, totalling over £1.8 million. In
the past year, 712 clients were supported, with 313 new starts, including various
demographics such as young people and those facing barriers to employment. The
partnership achieved notable outcomes, including 135 participants securing
employment, with 79% sustaining their positions for over 13 weeks. The report
highlights efforts to tackle child poverty, with 123 parents participating in relevant
projects and community support initiatives.  For 2025/2026, the partnership plans to
enhance support for individuals with disabilities and long-term health conditions, along
with a new Skills Planning Sub-Group to address skills gaps. The commissioning sub-
group has approved a budget proposal for various provision of services aimed at
improving employability outcomes. 
3.  BACKGROUND AND CONTEXT
Page 151

Page 152

3.1 Moray Pathways is the Local Employability Partnership (LEP) that includes
organisations and local employers from the public, private and third sector. It supports
individuals who require additional help into fair and sustainable jobs. On behalf of the
employability partnership, the Moray Council are the anchor organisation / lead
accountable body who co-ordinate the administration of all resources made available
for employability support and provision in Moray.  This diagram below shows the
national delivery model: 
3.2 The Moray Pathways commissioning sub-group (CSG) are responsible for evaluating
and scoring all financial procurement processes.  The organisations within the
subgroup are; Moray Council, Department for Work and Pensions, DYW Moray, Skills
Development Scotland and TSI Moray. The partnership reports to the Moray Economic
Partnership and leads on skills based actions within the Moray Economic Strategy. 
The total amount of funding in 2024/2025 was as follows:   
Scottish Government Grants
No-one left Behind (support to young people and adults)  £585K
Child Poverty / Progress for Parents Project                                 £683K     
UK Shared Prosperity Funding – People and Skills              
Sector-based Work Academy Programme                                     £433K
Keyworker and CLD Youth Support                                                   
Financial Literacies Project 
Whole Family Wellbeing Fund – Mentoring Young Talent £84K 
3.3  During 2024/2025 the annual investment plan aligned with the following national
strategic priorities and outcomes:   
Page 152

Page 153

ACHIEVEMENTS IN 2024/2025 
Uptake of employability support and outputs: 
3.5 • A total of 712 active clients have been supported in the last year by the partnership
(Includes clients who are carried forward from 2023/2024).
• A total of 313 new starts since April 2024, breakdown as follows: 156 Young
People, 114 (25-49 years), 43 (50 plus years) and 60 parents in poverty.
• Equalities Groups breakdown from new starts: 36 Care Experienced, 128 Mental
Health, 29 Physical / Learning Disability and 11 Criminal Convictions 
Participation outputs:
3.6 • 135 participants into employment (includes 9 Self-employment), 79% have
sustained 13 weeks plus.
• 285 participating in our vocational skills Sector-based Work Academy Programme
(SWAP).
• 65 into Further or Higher Education.
• 205 participating in barrier removal activities, 112 Creative Skills Network
activities, 56 CLD personal development support and 47 (new starts) counselling
support. 
• 29 participating in the engagement phase. These clients are recent new starts
and are at early stages of engaging with their Keyworker.  This stage involves
goal setting and formulating a pathway plan of learning activities to meet their
individual needs. 
Tackling Child Poverty 
3.7 • 123 Parents in Poverty participating in our Progress for Parents Project. The
progress for parents project provides person-centred employability support for
parents in Moray. The project aims to enhance reach, effectiveness of support
and establish more effective links between services that play a role in supporting
parents into work. This work is a critical aspect of activity to meet the statutory
targets set out in the Child Poverty (Scotland) Act 2017. All parents and carers on
low incomes are eligible to receive Parental Employability Support. However,
Local Employability Partnerships give specific consideration to the following
priority family groups as children in these groups continue to be at highest risk of
child poverty. The project has supported a total of 13 Parents under 25, 71 Single
Parents, 24 with 3 or more children, 18 living with a disability. 
• School aged childcare and Childminder grant scheme set-up for new and existing
providers
• 2 School Aged Childcare Pilot Schemes are being developed in Forres and
Buckie
• To enhance our reach to parents the project has delivered a total of 10
Community Breakfasts in various community hubs across Moray. A total number
Page 153

Page 154

of 156 families have participated and this has resulted in new requests to receive
parental employability support. 
• 6 parents participated in the Progress for Parents group in Buckie, in collaboration
with CLD Adult Learning team. The group was set up to provide an opportunity for
local parents to gain peer support, develop new skills, accreditation and thereafter
progress into learning, training and work opportunities (see short film below
highlighting 2 parents journeys). 
• A new policy to support the pilots in Forres and Buckie is being developed to
support use of the learning estate for school aged childcare provision. 
• Child Poverty research project developed to map and identify the specific needs
of families living with disability.
• Family Festival organised and delivered in partnership with Children’s Services to
provide an opportunity to enhance our reach to families who may benefit from our
support. 
Supporting people with disabilities and long-term health conditions 
3.8 • 126 people who have an economically inactive status have participated in our
Financial Literacies Project, delivered by Money Advice Moray Team (MAM) and
funded by the partnership via the UKSPF Fund. The project has resulted in clients
being referred from MAM to a Keyworker within the employability team and
thereafter progress to further learning, training or employment opportunities. 
• 157 people (new starts) supported with disability or mental health issues. 
Delivering jointly with wider services
3.9 • The work of the partnership is aligned with the following strategies; Corporate
Parenting Plan, Child Poverty Plan, Children’s Service Plan, Community Learning
and Development Plan and the Integrated Joint Board.
• A total of 9 organisations supported via our Community Space Fund Grant
Scheme to provide opportunities to engage with local residents and participate in
learning and training opportunities provided by the partnership. 
• The Link: Your Community Space Project. The Partnership worked in
collaboration with CLD and Community Safety to launch a new community hub in
November 2024 to support residents of New Elgin and surrounding areas. A
separate report to the Council meeting on 25 June will highlight the impacts of this
project to date. 
• Mentoring Young Talent – Funding from the Family Wellbeing Fund has resulted
in a wider offer to all young people aged 12-26 years.  The programme supports
young people to re-engage with education, improve health and wellbeing
outcomes and progress into positive destinations. Working in collaboration with
Children’s Services to develop a holistic approach including links to wider
supports for families and supporting families in poverty. 
• Creative Skills Network has supported 112 clients supported, 65% Digital Work,
25% Visual Arts and 10% bespoke tailored provision. The clients have developed
their personal development skills, overcome health and wellbeing barriers and
progressed into learning, training and employment as a result of this intervention.
1 young person has progressed into employment within a creative industry. 
• Counselling Network – a total of 488 counselling sessions delivered and 47 new
clients supported across the year.
• Community, Learning and Development – the partnership have committed to
providing resource to the CLD Adult Learning and a dedicated Youth Work                          
(employability) team.  The partnership identified a gap for young people, adults
and parents to participate in personal development group work programmes with
accreditation. The CLD adult learning team have piloted various learning
programmes for adults and parents, and they achieved certification which has
supported their pathway plan to progress into further education and employment. Page 154

Page 155

The Youth Work (employability) team are co-ordinating our summer programme
for school leavers who are at risk of a negative destination to help them gain
accreditation to support their progression plans. A new personal development
programme called Xplore has been piloted to provide a tailored programme
offering a choice of activities including creative arts, stem, digital, outdoor learning
and driving theory options. 
Working with employers to improve outcomes 
3.10 • During 2024/2025 out of the 127 clients who progressed into employment, the
following sectors were the most popular industry sectors: Customer Service,
Construction, Elementary Trades, Health and Social Sciences and Agricultural. 
Evaluation data highlights that clients are not often progressing into growth
sectors in high numbers and further development work is required with our
Sector-based Work Academy (SWAP) contract provider to ensure we are
providing training opportunities that support our biggest skills gaps. 
• The Moray Employer Recruitment Incentive (MERI) Grant Scheme provides a 6-
month paid job placement, the MERI scheme main objective is to support clients
into employment. Clients are matched into suitable job placements which are
often job carved (customised) in collaboration with local employers. 27 clients
have completed their job placement, 25 out of 27 people have sustained their
placement and remained in employment for more than 13 weeks. The following is
a breakdown of organisations which benefited from this scheme in this year: 33%
Third Sector and 77% Private (Micro businesses). 
• Apprenticeship Improvement Group are working on the actions within the Moray
Apprenticeship Strategy to improve the number of apprenticeship opportunities
on offer across all sectors. The Moray Apprenticeship Jobs Fair took place in
March and 830 attendees participated and a total of 30 local employers. There
was a mix of school pupils and those who are unemployed and supported by the
partnership. 
• The SWAP programme has progressed a total of 90 people into employment this
year, provided opportunities to participate in unpaid work placements and
delivered a range of industry specific qualifications with the support of local
employers. 
Experience of users:
3.11 Mentoring Young Talent - Mentors and Mentees
https://youtu.be/2nTySQ-g9Jk 
MERI - K’s Coffee Shop
https://youtu.be/9HPSooLh4FI 
MERI - Mr Moto
https://youtu.be/LTPGibd69r0 
MERI - GD Flooring
https://youtu.be/K7kfijqUwUc 
Progress for Parents, Buckie Group
https://youtu.be/AWGgiRybwNk 
Sector-based Work Academy Programme ( SWAP) Retail Course 
https://youtu.be/9ERiTEQ4HTA?si=hQOEWq9yg2fjQSNW 
Plans for 2025/2026
3.12 The SWAP programme this coming year will include an enhanced offer for people
living with disabilities and long-term health conditions. The programme will also include
Page 155

Page 156

additional support for parents who are underemployed and are keen to participate in
upskilling training opportunities to improve their prospects. 
A new Skills Planning Sub-Group has been established as part of Moray Economic
Partnership to align skills gaps and challenges across the partnership.  This provides
the opportunity to map and algin skills strategies across education establishments and
the LEP partnership. 
Annual Investment Plan LEP Provision Summary for 2025/2026
3.13 The LEP have set their priorities for 2025/2026 and these are aligned with national
requirements set by Scottish Government.  Scottish Government Funding for devolved
provision is required to: 
• Reduce inequality in the labour market by providing employability services to
those furthest from the labour market, people who are economically inactive,
and people on low incomes; 
• Reduce levels of child poverty by supporting parents, particularly those from the
priority family groups, to increase their income from employment through
employability services and relevant training; 
• Contribute to a reduction in the Disability Employment Gap by supporting
disabled people to enter and retain employment, including through the provision
of Specialist Employability Support (which must be in place from July 2025 Q2)
• Work in partnership with organisations involved in the delivery of employability
and ensure a continued mixed economy of provision in all local authority areas; 
• Work with wider public services at a local level to ensure wrap-around support is
available to people accessing employability support, recognising that other
services may be required to successfully support people towards and into
employment; 
• Work with employers locally to support successful and sustained outcomes for
participants, including but not limited to, delivering training opportunities to
participants aligned to local labour market demands; 
• Expand provision that supports green jobs and net zero commitments. 
It is the responsibility of the Grantee, (Moray Council) as Lead Accountable Body
(LAB), to ensure that the Local Employability Partnership (LEP) is utilising the grant
funding to deliver the employability support required to achieve their priorities as
outlined in the LEP Annual Investment Plan (AIP) for 2025-26 (see Appendix 1). The
Annual Investment Plan summary budget proposal was recently approved by the
Commissioning Sub-Group of the LEP to deliver the following range of services and
provision for young people, adults and parents: 
Inkwell Contract        £60K
Participant costs              £30K
Personal Development/CLD      £50K
Creative Skills Network       £40K
Counselling Contract       £40K
School Aged Childcare Grants              £50K
Sector-based Work Academy Programme (SWAP)   £400K
MERI Scheme        £240K
PR/Marketing        £30K 
A quarterly report will be provided to the Moray Economic Partnership on our progress
with our objectives for 2025/2026. 
National Benchmark
Page 156

Page 157

3.14 As of May 2025, the most recent available data on youth participation in Moray comes
from the May 2024 Interim Participation Snapshot published by Skills Development
Scotland (SDS). This snapshot provides insights into the engagement of 16–19-year-
olds in education, employment, training, or personal development activities.  This
indicates that 93.6% of young people in this age group were engaged in positive
destinations such as education, employment, training, or personal development
activities during the reporting period. This high participation rate reflects the
collaborative efforts of local partners, including SDS, Moray College UHI, Moray
Education, DYW Moray, Moray Pathways, and CLD Youth Work, in supporting young
people towards positive outcomes. The participation rate of 93.6% in May 2024
demonstrates sustained engagement among young people in Moray. While this is a
slight decrease from the 95.4% reported in the 2023 Annual Participation Measure, it
still represents a strong commitment to youth development in the region. The next
Annual Participation Measure report, covering data from 1 April 2024 to 31 March
2025, is scheduled for release in August 2025. This forthcoming report will provide a
comprehensive overview of youth participation trends in Moray and across Scotland.  
4.  SUMMARY OF IMPLICATIONS  
4.1 The table below shows whether risks and implications apply if the recommendations
are agreed:   
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement
Plan) 
X
Policy and Legal X 
Financial  X
Risk  X
Staffing  X
Best Value and Transformation  X
Property  X
Information Communications Technology/Digital             X
Equalities. Social Inclusion and Economic Impact        X 
Climate Change and Biodiversity Impact  X 
4.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following
Council Plan strategic priorities:
☒ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
Page 157

Page 158

☒ Improving wellbeing of our population   
4.3 Policy and Legal 
The services delivered within the Moray Pathways  local employability partnership
aligns to the No-one Left Behind Employability Strategy (2024-2027) and the local
delivery plan , which is due for renewal from 2026. 
4.4 Financial 
None 
4.5 Risk 
None 
4.6 Staffing 
None 
4.7 Best Value and Transformation 
None 
4.8 Property 
None  
4.9 Information Communications/Technology/Digital 
None 
4.10 Equalities, Social Inclusion and Economic Impact 
Moray Pathways Local Employability Partnership target people who face inequalities,
with the aim of reducing any disadvantage faced by any protected groups. The LEP
priorities positively support the Council’s statutory duty to reduce discrimination and
advance equality of opportunity. 
4.11 Climate Change and Biodiversity Impacts 
None 
5.  CONSULTATION  
5.1 This report has been prepared in consultation with the Depute Chief Executive
(Economy, Environment and Finance), the Acting Head of Economic Growth and
Development, the Economic Growth and Regeneration Manager, the Legal Services
Manager, the Equal Opportunities Officer, the Chief Financial Officer and Caroline
O’Connor, Committee Services Officer and any comments made have been
incorporated into the report. 
6.  BACKGROUND PAPERS  
6.1 None 
Page 158

Page 159

Local Authority - Moray
To provide flexible, person-centred
support under the No One Left Behind All-
Age Employability Service – including
further information on specific groups
identified as a local priority.
The Keyworker team provide 1:1 support to young people and adults.  The Moray Council Employability Team deliver a Mentoring Young Talent Project  for young
people aged 15-25 years, matching young people requiring additional support with a 1:1 Volunteer mentor for a minimum of 1 hour a week. The partnership fund
CLD staff to provide adult learning support to those who require group work, literacies support and tailored personal development opportunities.  The
partnership fund CLD Youth Work to co-ordinate all group work provision for young people and in particular our summer programme for school leavers and our
Xplore personal development programme.  Moray Pathways have a contract with Moray Arts Development Engagement to provide a creative skills network to
support unemployed people with barriers to progression and we have a contract with Elgin Counselling Centre to improve mental health and wellbeing for our
clients.  Our priority target groups are as follows:  People with disability, long term health condition, young people at risk of NEET, underemployed people,
veterans, care experienced and parents in poverty.
To reach and support parents using
Parental Employability Support funding -
including further information on specific
Parental groups identified as a local
priority.
Single parents make up around 50% of previous referrals. We continue to see Mums with low self esteem and confidence, feeling isolated and lacking work
experience. We are working with the CLD Team to provide groups where Mums can build their skills and confidence. Closer partnerships with 3rd sector parent
support services and Family Nurse Partnership to provide follow on support from these services. Families with disabilities have engaged through the CPAF
funding last financial year, we will continue to support this group in collaboration with the Localities Manager to develop supports that they need. We have also
used the Local Child Poverty Data Set to target small geographical areas in most need. Work is being done to see how this can be achieved collaboratively
between the 3rd Sector and Public Sector. School Age Childcare remains a barrier to parents entering any learning, training and employment. Pilot projects have
started, with more being developed this year.  Our SWAP contract will include funding to support underemployed parents in poverty and provide funding to
support upskilling training opportunities.  Mums under 25 and Single parent families will continue to be a large percentage of the referrals. Minority Ethnic
Groups
To provide Specialist Employability
Support using Employability SES funding
for disabled people and people with long
term health conditions.
Where applicable, please detail models
being utilised and whether you are aiming
for full fidelity or otherwise.
Where you are not using specialist models,
what makes this provision 'specialist' over
and above mainstream No One Left Behind
support?
Our Sector-based Work Academy Programme is being re-tendered and will include the requirement for the provider to deliver specialist support for people who
need it and it will include a place and train model working in collaboration with local employers.  The programme will include the requirement to provide an
enhanced level of support and we are referring to this as Swap Plus support.  A case conference model involving the moray council employability team, health,
social work and others will be involved with assessing these referrals and the level of support required using a multi-agency approach.  The SWAP programme
will require an increase in employer engagement to provide a wide range of experiences of work on offer which are fit for purpose for clients with disability and
living with a long term health condition.
To reach and support disabled people who
do not require Specialist Employability
Support.
All people with a disability will be provided support by our keyworker service and those suitable for the SWAP programme will be referred and those who don’t
engage in the SWAP programme will be supported with a pathway plan with their keyworker and utilising tailored pathway partner providers.
To reach and support minority ethnic
people.
The partnership works in collaboration with the local resettlement team to provide employability support and training opportunities with young people and
adults that are referred.
To reach and support economically
inactive people.
The Money Advice Moray team is funded via UKSPF and we are working together to improve referrals from MAM to our Keyworker Service.  The MAM team
engaged with 112 people who were economically inactive in 2024/2025.  We continue to work with DWP and SDS to reach and support people within this target
group. 
Service Delivery
What activity do you and your partners intend to deliver within this financial year via NOLB funding?
ANNEX A - Annual Investment Plan - 2025-26
APPENDIX 1
Page 159

Page 160

As we look to evaluate the impact of
NOLB/PES/SES and to help ensure diversity
of participation and representation of
views in a meaningful way, what are your
plans to ensure that lived experience is
reflected in the co-design, evaluation and
continuous improvement of your service
delivery?
Families with a disability meet with Project Leads on a monthly basis, any decisions are made jointly and feedback is provided to the group of parents at these
meetings, other services are also being invited in to the meetings to help understand the voice of these families. Groupwork is co-produced with participants to
ensure it meets their needs. Community work is developed in collaboration with the Children's Services and CLD teams using feedback from place based
engagement. Feedback from families is also shared with colleagues in strategic and operational meetings.  All funded provision is aligned to co-production
outcomes as a priority.  We are working in collaboration with social work with regards to responding to the needs of care experienced people via the Champions
Board and our mentoring programme is co-designed with young mentees.
Please describe what external provision
you intend to commission in this financial
year.
Is this planned new commissioning or are
existing providers commissioned over
multiple years?
Swap Programme, Creative Skills Network and Counselling Support ( approach tab has the details )
What engagement/marketing will be
undertaken with participants and
stakeholders such as DWP; Social Security
Scotland; Registered Social Landlords;
Childcare; Skills Development Scotland;
Carers; NHS/Health services; Social Work;
Other Local Community/Third Sector
Organisations to further improve or
support referral pathways, particularly in
respect of under-represented groups in
your area?
Engagement work already taken place with stakeholders around school age childcare. Building plans for specific geographical areas, making sure  plans are
joined up and maximising resources. Plan to hold an event focusing on early intervention for families, last year this was called "Family Fest", which showcased
all supports available to families including family support, services that mitigate poverty and employability services. Project Officer for PES has been visiting
services for last 2 months to get to know services, see what their challenges are and discuss ways in which services can work together. This has worked well
with the Family Nurse Partnership and a family support service in the 3rd Sector. 
Please describe planned engagement with
employers including Anchor Institutions
and Local Businesses and any work
towards supporting the Green Economy.
The- LEP have commenced a Skills Planning Sub Group which will align with the Regional Transformation Opportunities in the region and supporting a just
transition and net zero.
Please describe the plans for the provision
of Employer Recruitment Incentives/paid
work placements.
Our Moray Employment Ready Intiative will be funded this year to support iro 27 fully paid 6 month work placements.  Moray has a high number of small and
micro businesses and this programme supports their business growth at the same time as providing a valuable experience of work and skills developmennt to
support skills gaps locally.
Please describe the plans for the provision
of training allowances.
The SWAP programme includes funding to support the payment of training allowances for young people who are eligible.
Page 160

Page 161

Please describe any challenges, issues or
concerns that may affect delivery this
financial year.
What steps are you taking to address
these?
Lack of school age childcare continues to impact parents ability to take up employment. Scottish Government are already invovled in the Owkring Groups, with
open communication about funding opportunities and change in legislation. Ideas and solutions are shared across the Northern Scotland Network through the
HIREP working group.
Do you require any further support from
Scottish Government regarding the
challenges/issues noted above?
Scottish Government colleagues are engaged with school aged childcare working groups in Moray.
Is there anything else you like to share
about your plans?
The Moray Pathways LEP have commenced a Skills Planning Sub Group to align our skills strategy / training provision with education establishments and other
key stakeholders.  An action plan will be developed to support this piece of work and will align our skills provision with the regional transformation opportunities
in the region and meeting the needs of the  Moray Economic Strategy.  It is vital that we have shared language with skills and we are aligning our work with key
stakeholders and future developments in the Highlands and Islands region.
Page 161

Page 162

Local Authority -
Target Group Rationale for Intervention Delivery Method/Description
Delivery Partners (if
known)
Delivery Partner
Sector
Anticipated
Start Date
Actual Start
Date
Forecast New
Starts Forecast Spend Outcomes Expected
Unemployed People All Age employability service for
unemployed people with barriers to
finding work.  Service is for those who
lack skills, confidence, prior work
experience and require support in order
to prepare for and find employment.
Delivered via Council Key Worker
employability staff - a one-stop-shop for
all things employability.  Key Worker
service registers; assesses and agrees
an action plan; access to personal
support; BOIW calculation; needs
assessment and action plan; access to
a wide range of training and group work;
work experience; sector based work
academies etc.
Core service is delivered by
Council Employability Team
Public 01/04/2025 01/04/2025 300 £312,036 Providing person-centred support to
people who wish to work but face
barriers to do so
Parents in Poverty Delivery of our Progress for Parents
project.  An Employability service for
parents in poverty with barriers to
finding work
Delivered via Council Project Officer and
team of keyworkers
Council team and CLD
partners
Public 01/04/2025 115 £          284,539.00 Helping people into fair and
sustainable jobs to deliver inclusive
growth , tackle child poverty and
support better health
Unemployed, Underemployed,
Disabled People and long term
health conditions
Sector Based Work Academy ( Moray
Pathways SWAP). Vocational skills
programme with swap plus support
integrated for those requiring specialist
support. For people ready for an
experience of work.
Delivered via a tendered contract. Tailored depending on
sector provision delivering
Third 01-Apr 200 £          178,164.00 Supporting the creation of a labour
market that is fair, inclusive and
provides sustainable and well-paid
jobs
Unemployed people of all ages
facing barriers
Creative Skills Network Programme. Delivered by Moray Arts Development
Engagement Network, providing creative
arts provision to clients of all ages and
with multiple barriers
Third sector and self-
employed freelancers
Third 01/04/2025 90 £             60,000.00 Enabling equal access to an
increased range of opportunities
whilst challenging bias, structural
and personal barriers
Unemployed people of all ages
facing barriers
Delivery of personal development group
work  adult learning and youth work
programmes to improve confidence and
wellbeing and gain accreditation
Delivered by Council Adult Learning and
Youth Work ( Employability Team)
Third sector partners -
tailored to individuals
Public 01/04/2025 01/04/2025 110 £          110,000.00 Enabling equal access to an
increased range of opportunities
whilst challenging bias, structural
and personal barriers
Parents in Poverty School Aged Childcare Grants to
support new start ups or supporting
existing organisations
Administered by Moray Council
Employability Team and Business
Gateway
Local School Age Childcare
Providers / Public and
Private
Currently Unknown 01/08/2025 30 £             40,000.00 Supporting the creation of a labour
market that is fair, inclusive and
provides sustainable and well-paid
jobs and helping people into fair and
sustainable jobs to deliver inclusive
growth, tackle child poverty and
support better health
Unemployed people of all ages
facing barriers
Counselling Contract to provide mental
health intervention to overcome barriers
to progression
Delivered via a contract with Elgin
Counselling Centre
Freelance Counsellors Private 01/04/2025 01/04/2025 50 £             40,000.00 Enabling equal access to an
increased range of opportunities
whilst challenging bias, structural
and personal barriers
Care Experienced and young
people ( 15-25 years at risk of
NEET
Mentoring Young Talent Programme 1:1
Volunteer Mentoring Programme to
support young people requiring support
Delivered via the Moray Council
Employability Team
Mix of providers across
public, private and third
sector
Public 01/04/2025 40 £             53,748.00 Providing person-centred support to
people who wish to work but face
barriers to do so
Care Experienced, Parents in
Poverty, Disabled People, young
people at risk of NEET and long
term health conditions
Moray Employment Ready Initiative
(MERI), Statistics show
Co-ordinated by Moray Council
Employability Team,  6 month paid job
placements
Mix of providers across
public, private and third
sector
Currently Unknown 15/06/2025 26 £          240,000.00 Supporting the creation of a labour
market that is fair, inclusive and
provides sustainable and well-paid
jobs and helping people into fair and
sustainable jobs to deliver inclusive
growth, tackle child poverty and
support better health
Unemployed people of all ages
facing barriers
Supporting place based approach and
data analysis
Hanlon Database Costs and
PR/Marketing Costs
Freelance consultant and
Private Hanlon Business
Private 01/04/2025 £             30,000.00 Enabling equal access to an
increased range of opportunities
whilst challenging bias, structural
and personal barriers
Unemployed people of all ages
facing barriers
Supporting 1:1 participant costs, for
meetings, interviews and other
expenses
Participant Costs Mix of providers across
public, private and third
sector
Public 01/04/2025 £             30,000.00 Providing person-centred support to
people who wish to work but face
barriers to do so
Unemployed people of all ages
facing barriers
Supporting community outreach and
access to clients
Inkwell Employability Hub Provision
Elgin Youth Development Group
Elgin Youth Development
Group
Public 01/04/2025 £             55,000.00 Enabling equal access to an
increased range of opportunities
whilst challenging bias, structural
and personal barriers
When completing the tables above and below, please include the following information:
Target Group Rationale for Intervention Funding Source/Delivery
Method/Description
Delivery Partners (if
known)
Delivery Partner
Sector
Anticipated
Start Date
Actual Start
Date
Forecast New
Starts Forecast Spend Outcomes Expected
Care Experienced and young
people ( 12-25 years at risk of
NEET
Mentoring Young Talent Programme 1:1
Volunteer Mentoring Programme to
support young people requiring support
Delivered via the Moray Council
Employability Team , Whole Family
Wellbeing Fund
Mix of providers across
public, private and third
sector
Public 01/04/2025 £             84,000.00 Improved family wellbeing of the
family and providing person-centred
support via volunteer mentor
Unemployed, Underemployed,
Disabled People and long term
health conditions
Sector Based Work Academy ( Moray
Pathways SWAP). Vocational skills
programme with swap plus support
integrated for those requiring specialist
support. For people ready for an
experience of work.
Delivered via a tendered contract.
UKSPF
Tailored depending on
sector provision delivering
Third 01-Apr 15/06/2025 £          221,836.00 Supporting the creation of a labour
market that is fair, inclusive and
provides sustainable and well-paid
jobs
ANNEX B - Service Delivery Requirements and Approach Template  - 2025-26
Delivery with LA, UKSPF or Other Funding
Anticipated Start Date - When do you expect to start this particular provision.
Forecast New Starts - How many new participants will access/be supported by this provision this financial year?
Forecast Spend - How much do you expect to spend on this particular provision in this financial year?
Outcomes Expected - Describe the types of outcomes expected and the % of new starts expected to achieve this.
Delivery Method - What is being delivered/provided and how e.g. Key Workers providing 1-2-1 support; Paid Work Placement etc.
Delivery Partners - Record whether this is expected to be in-house delivery or which external partners have been/may be commissioned.
Delivery Partner Sector - Record whether the delivery partner is Public; Private or Third Sector or Mixed.
Moray
Plans for Delivery with NOLB Funding
Target Group - Describe the priority groups being provided with support. Please include the groups identified in cells B8-B13 of the Description tab.
Rational for Intervention - Describe why this group has been identified, e.g. What statistical evidence has been utilised.
Page 162

Page 163

Unemployed, Underemployed,
Disabled People and long term
health conditions
Money Advice Moray Financial
Literacies Project
Delivered by council money advice
moray team  UKSPF
tailored depending on
sector provision delivering
Public 01/04/2025 £          133,058.00 Enabling equal access to an
increased range of opportunities
whilst challenging bias, structural
and personal barriers
Young people at risk of NEET and
unemployed , young parents in
poverty
CLD Youth Work ( Employability team).
Identified need to provide group work for
School Leavers and young people
requiring personal development support
and accreditation
Delivered by Council CLD Youth Work (
Employability team )
Tailored depending on
sector provision delivering
Public 01/04/2025 £          126,678.00 Enabling equal access to an
increased range of opportunities
whilst challenging bias, structural
and personal barriers
Unemployed, Underemployed,
Disabled People and long term
health conditions
Management of LEP, Skills Planning
Lead for Moray Council / LAB for Funding
and all age employability lead)
Moray Council ( Core Funding ). Team
Manager, Lead Officer ( All age
employability) , Admin support and 1 X
Keyworker
Tailored depending on
sector provision delivering
Public 01/04/2025 £          241,973.00 Enabling equal access to an
increased range of opportunities
whilst challenging bias, structural
and personal barriers
Page 163

Page 164

Local Authority -
TARGET GROUP Q1 Q2 Q3 Q4 TOTAL
PARTICIPANTS
Caseload at
31/03/25
Anticipated
Re-Starts in
2025/26
All Age Employability - Excluding Parents 75 75 75 75 300 589
Parental Employability Support - Parents 25 20 35 35 115 123
TOTAL PARTICIPANTS 100 95 110 110 415 712 0
Of Which:
Specialist Employability Support 21 21 21 21 84
Volume
115
200
90
110
30
50
40
26
0
0
0
Unemployed people of all ages facing barriers
Unemployed people of all ages facing barriers
Parents in Poverty
Unemployed people of all ages facing barriers
Unemployed people of all ages facing barriers
Unemployed people of all ages facing barriers
The table below records how many NEW individual participants will access NOLB services each quarter - do not include individuals who
have restarted following a previous period of participation.  Input required in white cells ONLY please.
The data in the table below (self-populated from the data entered in Annex B) records volumes within your specified Target Groups. The Total
will not balance with the data in the table above as individuals could be counted in more than one Target Group i.e. a Parent could be Disabled
and also Minority Ethnic, therefore counting in 3 Groups.
NO ONE LEFT BEHIND - VOLUME PROFILES - 2025/26 (SG Funding Only)
Care Experienced and young people ( 15-25 years at risk of NEET
Moray
Care Experienced, Parents in Poverty, Disabled People, young
people at risk of NEET and long term health conditions
Parents in Poverty
Unemployed, Underemployed, Disabled People and long term
Specific Target/Characteristic Groups
Unemployed people of all ages facing barriers
Page 164

Page 165

0
0
Budget Lines Q1 Q2 Q3 Q4 TOTAL
All Age Employability (SG funding) 164,369.25£      164,369.25£      164,369.25£      164,369.25£      657,477.00£   
All Age Employability (LG Core) 60,493.25£   60,493.25£   60,493.25£   60,493.25£   241,973.00£   
All Age Employability (UK SPF) 60,196.50£   60,196.50£   60,196.50£   60,196.50£   240,786.00£   
All Age Employability (Other) 21,000.00£   21,000.00£   21,000.00£   21,000.00£   84,000.00£  
All Age Employability Total 306,059.00£      306,059.00£      306,059.00£      306,059.00£      1,224,236.00£ 
Parental Employability (SG Funding) 169,675.25£      169,675.25£      169,675.25£      169,675.25£      678,701.00£   
Parental Employability (LG Core) -£  
Parental Employability (UK SPF) 60,196.50£   60,196.50£   60,196.50£   60,196.50£   240,786.00£   
Parental Employability (Other) -£  
Parental Employability Total 229,871.75£      229,871.75£      229,871.75£      229,871.75£      919,487.00£   
Specialist Employability Support (SG Funding) 24,094.25£   24,094.25£   24,094.25£   24,094.25£   96,377.00£  
Specialist Employability Support (LG Core) -£  
Specialist Employability Support (UK SPF) -£  
Specialist Employability Support (Other) -£  
Specialist Employability Support Total 24,094.25£    24,094.25£    24,094.25£    24,094.25£    96,377.00£   
Total Funding (SG Funding) 358,138.75£      358,138.75£      358,138.75£      358,138.75£      1,432,555.00£  
Total Funding (LG Core) 60,493.25£   60,493.25£   60,493.25£   60,493.25£   241,973.00£     
Total Funding (UK SPF) 120,393.00£      120,393.00£      120,393.00£      120,393.00£      481,572.00£     
Total Funding (Other) 21,000.00£   21,000.00£   21,000.00£   21,000.00£   84,000.00£  
Employability Funding Total 560,025.00£      560,025.00£      560,025.00£      560,025.00£      2,240,100.00£ 
0
Unemployed people of all ages facing barriers
NO ONE LEFT BEHIND - FINANCIAL FORECASTS - 2025/26
Page 165

Page 166

Job Role
Employability
Key Worker
Child Poverty 
Co-ordinator
Team Leader /
Management
Skills /
Project Workers
(see note *1 below)
Administration
(see note *2
below) TOTAL
*1. Please specify job
titles for the Skills /
Project Workers
(no need for FTE
breakdown)
*2. Please specify job titles
for the Administration
Workers (no need for FTE
breakdown)
Number of Full Time
Equivalent Staff 9.0 1.0 5.0 1.0 16.0
Project Officer x 4  1 X
Adult Learning worker
Compliance Officer
Example 9.5 1.0 1.3 3.5 1.7 17.0
Progression Worker;
Vocational Development
Worker; Skills Adviser
Compliance Officer;
Finance; Clerical;
Data Co-ordinator
Please confirm the staff resource who will be working on delivery of NOLB/PES/SES utilising Scottish Government NOLB funding.
*1. From last years AIP's, some examples that may be included here - Employability Intervention Officer; Resettlement Employment Client Adviser; Senior Youth Worker; Employability Support Worker;
Progression Worker; Pre-Employability Support Worker; Money Advice Adviser; Activity Agreement Co-ordinator; Vocational Development Worker; Positive Pathways Co-ordinator; Financial Inclusion
Officer; Employability Partnership Support Lead; Skills Adviser; Engagement Worker, Project Officer/Assistant, YPG Co-ordinator etc.  Plus any other similar staff not mentioned in this list.
*2. From last years AIP's, some examples that may be included here - Clerical; Administrator; Data/MI Systems Co-ordinator; Compliance Officer; Finance. Plus any other similar staff not mentioned in
this list.
Number of FTE Staff - 2 full time Key Workers and 3 part time Key Workers each working 0.5 weekly hours = 3.5 Key Workers in total.
Page 166

Page 167

Report to: Meeting Date:Economic Development
and Infrastructure
Services Committee
17 June 2025
Report
by:
Report No:Depute Chief Executive
(Economy, Environment
and Finance)
HPS015/25
Author: Ian Walker, Asset
Manager (Commercial
Buildings)
Contact Email: ian.walker@moray.gov.uk
Subject: List Of Property Transactions Concluded Under Delegated Powers
1. PURPOSE
☐ For Decision      ☒  For Information
1.1 This report is submitted to the Economic Development and Infrastructure Services
Committee in terms of Section III F (5) of the Council’s Scheme of Administration
relating to industrial and commercial development.
2. SUMMARY
2.1 The purpose of this report is to inform the Committee of property transactions which
have been dealt with under delegated powers.
3. BACKGROUND AND CONTEXT
3.1 In terms of the Council’s Scheme of Delegation, the Head of Housing and Property has
delegated authority to conduct rent reviews and fix new rents.
3.2 In terms of the Council’s Scheme of Delegation, the Head of Housing and Property has
delegated authority to grant leases, licenses or other occupation agreements of land
and buildings for 25 years or less duration where the initial rent does not exceed
£35,000 per annum and sites on long term building leases of up to 125 years duration
where the initial rent does not exceed £35,000 per annum.
3.3 In terms of the Council’s Scheme of Delegation, the Head of Housing and Property has
delegated authority to grant wayleaves or servitudes over Council owned property.
Page 167

Page 168

3.4 In terms of the Council’s Scheme of Delegation, the Head of Housing and Property has
delegated authority to grant assignations of existing leases where the terms of lease
remain substantially unaltered and to authorise sub-lets.
4. PROPOSALS
4.1 APPENDIX 1 – rent reviews
4.2 APPENDIX II – leases
4.3 APPENDIX III – servitudes and wayleaves
4.4 APPENDIX IV - assignations
5. SUMMARY OF IMPLICATIONS
5.1 The table below shows whether risks and implications apply if the recommendations
are agreed:
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement
Plan)
✓
Policy and Legal ✓
Financial ✓
Risk ✓
Staffing ✓
Best Value and Transformation ✓
Property ✓
Information Communications Technology/Digital ✓
Equalities. Social Inclusion and Economic Impact ✓
Climate Change, Biodiversity and Sustainability ✓
5.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans.
a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following
Council Plan strategic priorities:
☐ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in Moray.
Page 168

Page 169

☐ Empowering and connecting communities.
☐ Improving wellbeing of our population
5.3 Policy and Legal
None.
5.4 Financial
The transactions detailed in APPENDICES I, II, and III will generate an income to the
Council.
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend
this Year
Virement
From
Other
Comment
s
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable
)
Other
Comment
s
5.5 Risk
None.
5.6 Staffing
None.
5.7 Best Value and Transformation
None.
5.8 Property
None.
5.9 Information Communications/Technology/Digital
None.
5.10 Equalities, Social Inclusion and Economic Impact
None.
5.11 Climate Change and Biodiversity Impacts
None.
6. CONSULTATION
6.1 None.
Page 169

Page 170

7. BACKGROUND PAPERS
7.1 None.
Page 170

Page 171

APPENDIX I
REPORT TO THE ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES COMMITTEE ON 17 JUNE 2025
LIST OF RENT REVIEWS OF BUILDINGS AND SITES - SUBMITTED FOR NOTING
1. Ref No.
2. Valuer’s Ints.
1. Address
2. Tenant
1. Building (m²)
2. Site (Ha)
1. Date of Entry
2. Review Period
Interval
1. Previous Rent
2. New Rent
Remarks
1. FR/1/202
2. AGREIG
1. 8 West Road, Forres
2. Gael Force Engineering Ltd
1. 161.65sqm
2. 0.03Ha
1. 21/3/22
2. 3 years
1. £12,250 p.a.
2. £14,700 p.a.
Permitted Use:
Steel fabrication
workshop and store.
1. FR/4/208
2. AGREIG
1. 8 Waterford Circle, Forres
2. Stephen Calvert
1. 110sqm
2. 0.03Ha
1. 10/9/21
2. 3 years
1. £11,000 p.a.
2. £12,250 p.a.
Permitted Use:
Manufacture and
storage of joinery
products.
1. EL/1/302
2. SADEWO
1. 18A Chanonry Road North,
Elgin
2. Mr Yasin Gul
1. -
2. 0.07Ha
1. 1/6/10
2. 5 years
1. £3,575 p.a.
2. £3,930 p.a.
Permitted Use:
Car wash and
valeting centre.
1. FR/4/207
2. AGREIG
1. 6 Waterford Circle, Forres
2. Timothy Harrison Phipps
1. 70sqm
2. 0.03Ha
1. 6/4/16
2. 3 years
1. £7,250 p.a.
2. £8,150 p.a.
Permitted Use:
Workshop and store
for fabric repairs and
manufacturing.
Page 171

Page 172

1. EL/1/212
2. SADEWO
1. 10B Chanonry Street, Elgin
2. Bell Decorating Group Ltd
1. -
2. 0.02Ha
1. 17/8/07
2. 5 years
1. £1,085 p.a.
2. £1,620 p.a.
Permitted Use:
Storage and industrial
purposes (including
office premises) in
connection with
tenant’s business as
property maintenance
contractors including
painting and
decorating and
associated trades.
1. EL/5/109
2. SADEWO
1. 4 Parade Spur South, Elgin
2. William Young
1. -
2. 0.06Ha
1. 17/3/00
2. 5 years
1. £2,200 p.a.
2. £2,600 p.a.
Permitted Use:
Motorcycle showroom
on site.
1. EL/5/252
2. SADEWO
1. 4 Diagonal Road, Elgin
2. Darroch & Allan (Joiners &
Builders) Ltd
1. 111sqm
2. 0.16Ha
1. 1/7/09
2. 3 years
1. £13,800 p.a.
2. £15,000 p.a.
Permitted Use:
Storage of building
materials.
1. EL/1/219
2. SADEWO
1. 16 Chanonry Road North,
Elgin
2. Shaun Stewart, Trading as
SKS Coatings
1. 200sqm
2. 0.02Ha
1. 1/9/18
2. 3 years
1. £15,800 p.a.
2. £17,400 p.a.
Permitted Use:
Repair and
refurbishment of
vehicle wheels,
vehicle detailing and
customisation and
associated works.
Page 172

Page 173

1. BK/1/215
2. AGREIG
1. 3 March Road East, Buckie
2. Andrew Murray Electrician
Ltd
1. 112.41sqm
2. 0.03Ha
1. 19/7/19
2. 3 years
1. £8,900 p.a.
2. £9,200 p.a.
Permitted Use:
Workshop and store
for an electrical
contractor.
1. EL/645/38
2. SADEWO
1. 2 High Street, Elgin
2. Social Security Scotland
1. -
2. -
1. 30/12/19
2. Annually
1. £9,065 p.a.
2. £9,320 p.a.
Permitted Use:
Licence to use 3
desks in the Annexe.
1. EL/5/267
2. SADEWO
1. Unit A + Unit B Pinefield
Business Centre, Elgin
2. Riverside Kitchens (Elgin)
Ltd
1. 231.3sqm
2. 0.04Ha
1. 1/6/22
2. 3 years
1. £15,950 p.a.
2. £17,100 p.a.
Permitted Use:
Workshop and store
in connection with
tenant’s kitchen
design and
installation business.
1. EL/1/123
2. SADEWO
1. 8 Chanonry Street, Elgin
2. Neil Hadden
1. -
2. 0.04Ha
1. 10/4/00
2. 5 years
1. £1,560 p.a.
2. £2,000 p.a.
Permitted Use:
General industrial
and storage uses in
connection with
tenants plumbing
business.
Page 173

Page 174

APPENDIX II
REPORT TO THE ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES COMMITTEE ON 17 JUNE 2025
LIST OF LEASES OF BUILDINGS AND SITES – SUBMITTED FOR NOTING
1. Reference No.
2. Officer’s Ints
1. Address
2. Tenant
1. Building (m²)
2. Site (Ha)
1. Date of Entry
2. Review Period
Rent
(per annum)
Remarks
1. HN/750/28
2. AGREIG
1. Store 9 Hopeman
Harbour, Hopeman
2. Mr Christopher Andrew
and Mrs Nia Carrington
Morrison
1. 16.54sqm
2. -
1. 1/3/25
2. 3 years
£1,000 Permitted Use:  Storage of
water sports equipment.
1. DU/1/202
2. SOAND
1. 4 Dufftown Industrial
Estate, Dufftown
2. Stewart James Christie
1. 76.6sqm
2. 0.041Ha
1. 1/3/25
2. 3 years
£5,300 p.a. Permitted Use:  Personal
use garage and workshop
for motor vehicles.
1. FR/1/207
2. AGREIG
1. Unit 10 Greshop Road,
Forres
2. Susan Bates-Elton
1. 85sqm
2. 0.01Ha
1. 27/3/25
2. 3 years
£7,950 p.a. Permitted Use:  Provision
of sock finishing services,
storage and distribution of
socks.
1. EL/1/223 1. Unit 3, 2 Chanonry Road
North, Elgin
1. 25sqm 1. 15/4/25 £3,900 p.a. Permitted Use:  Storage of
museum documents,
Page 174

Page 175

2. SADEWO 2. The Moray Society 2. - 2. 3 years artefacts and other related
materials.
1. KE/1/224
2. SADEWO
1. Unit 4, 4 Westerton
Road South, Keith
2. The Moray Society
1. 25.15sqm
2. -
1. 15/4/25
2. 3 years
£3,100 p.a. Permitted Use:  Storage of
museum documents,
artefacts and other related
materials.
Page 175

Page 176

APPENDIX III
REPORT TO THE ECONOMIC DEVELOPMENT & INFRASTRUCTURE SERVICES COMMITTEE ON 17 JUNE 2025
GRANT OF SERVITUDES AND WAYLEAVES
Officer Intls File Ref Address Description Price Comments
CQ EL/Gen Site Compound
Linkwood Road (Jnct Reiket
Lane)
Elgin
Short term occupation/site
compound licence to Kier
Construction
Site area: 4,260sqm
Start date: 17/1/25
Expiry: 17/7/25
£0 Compound in support of
contractors works to Council
Housing stock (non-chargeable)
Page 176

Page 177

APPENDIX IV
REPORT TO THE ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES COMMITTEE ON 17 JUNE 2025
LIST OF ASSIGNATIONS OF SITES/UNITS - SUBMITTED FOR NOTING
1. Ref No
2. Valuer’s Ints
1. Assignor
2. Assignee
Address Lease Details Remarks
1. BK/1/223
2. AGREIG
1. Lawrie’s Light Haulage
2. Mark Stevenson
Contractors Ltd
10A March Road East
Buckie
AB56 4BY
Lease Commenced
3/2/17
Lease Term
3(Y), 0(M), 0(D)
Rental
£2,500 p.a.
Permitted Use:
Storage compound for light
haulage business.
1. BK/1/109
2. AGREIG
1. Caledonia BCK35 Fishing
Ltd and Caley Fisheries Ltd
2. Craig Devlin
2 March Lane
Buckie
AB56 4BB
Lease Commenced
30/3/92
Lease Term
99(Y), 0(M), 0(D)
Rental
£1,175 p.a.
Permitted Use:
Workshop/office.
1. EL/5/254
2. SADEWO
1. David Coulson
2. Keith Paterson
1 Parade Spur North
Elgin
IV30 6AL
Lease Commenced
1/8/02
Lease Term
99(Y), 0(M), 0(D)
Rental
£1,255 p.a.
Permitted Use:
Engineering workshop.
Page 177