Democracy Spraffa

Agenda Document Pack - Economic Development and Infrastructure Services Committee - 03/09/2024

Moray Council · 3 September 2024
Back to Economic Development and Infrastructure Services Committee — 3 September 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Economic Development and Infrastructure Services
Committee 
Tuesday, 03 September 2024 
NOTICE IS HEREBY GIVEN that a Meeting of the Economic Development and
Infrastructure Services Committee is to be held at Council Chambers, Council
Office, High Street, Elgin, IV30 1BX on Tuesday, 03 September 2024 at 09:30. 
BUSINESS 
1 Sederunt 
2 Declaration of Group Decisions and Members Interests * 
3 Resolution
Consider, and if so decide, adopt the following resolution:
"That under Section 50A (4) and (5) of the Local Government
(Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Item 9 of business on
the grounds that it involves the likely disclosure of exempt information
of the class described in the relevant Paragraphs of Part 1 of Schedule
7A of the Act.”   
4 Minute of meeting dated 18 June 2024 7 - 12
5 Written Questions ** 
6 Review of Out of Area Burial Charges and Update on
Cemetery Management
Report by Depute Chief Executive (Economy, Environment and
Finance)  
13 - 22
7 Moycroft Depot Project
Report by Depute Chief Executive (Economy, Environment and
Finance)  
23 - 48
Page 1

Page 2

8 Environmental and Commercial Services and Economic
Growth and Development Services (Economic
Development) Revenue and Capital Budget Monitoring
to 30 June 2024
Report by Depute Chief Executive (Economy, Environment and
Finance)  
49 - 58 
Item(s) which the Committee may wish to consider with
the Press and Public excluded   
9 Industrial Portfolio Annual Report 2023-24 [Para 8 and 9]
• 8 & 9. Information on proposed terms and/or expenditure to be
incurred by the Authority; 
Information Reports - Not for Discussion at this Meeting
Any member wishing to call in a noting or information report from one
meeting shall give notice to Committee Services at least 48 hours
before the meeting for which the report is published. The Notice shall
be countersigned by one other elected member and shall explain the
reason for call in including any action sought.   
Information Report - Nature Restoration Fund 2023-24
Update
Report by Depute Chief Executive (Economy, Environment and
Finance)  
59 - 66 
Information Report - Highland and Moray Local Space
Cluster
Report by Depute Chief Executive (Economy, Environment and
Finance)  
67 - 70 
Information Report - List of Property Transactions
concluded under Delgated Authority
Report by Depute Chief Executive (Economy, Environment and
Finance)  
71 - 86
Page 2

Page 3

Summary of Economic Development and Infrastructure
Services Committee functions:
Roads Authority; Lighting Authority, Reservoirs Act 1975, Public
Passenger Transport; Flood Prevention; Twinning; Piers and Harbours
and Coast Protection; Industrial and Commercial Development;
Environmental Protection; Burial Grounds; Assistance to Industry or
Commerce; Public Conveniences; Council Transportation; Catering &
Cleaning; Land Reform (Scotland) Act 2003; Countryside Amenities;
Tourism, monitoring funding from European Programmes, youth
training and employment creation scheme and provide Architectural,
Quantity Surveying, Maintenance and Allied Property Services.     
Watching the Meeting
You can watch the webcast live by going to: 
http://www.moray.gov.uk/moray_standard/page_43661.html    
Webcasts are available to view for 1 year following the meeting.  
You can also attend the meeting in person, if you wish to do so,
please come to the High Street entrance door and a member of
staff will be let into the building. 
Page 3

Page 4

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how
the individual or members of the group will vote on any item(s) of business on
the Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any
relevant and competent business within the specified remits not already on the
agenda, to the Chair provided it is received by the Proper Officer or Committee
Services by 12 noon two working days prior to the day of the meeting.  A copy
of any written answer provided by the Chair will be tabled at the start of the
relevant section of the meeting.  The Member who has put the question may,
after the answer has been given, ask one supplementary question directly
related to the subject matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the
consent of the Chair. If a Member does not have the opportunity to put a
supplementary question because no time remains, then he or she can submit it
in writing to the Proper Officer who will arrange for a written answer to be
provided within 7 working days. 
Page 4

Page 5

MORAY COUNCIL 
Economic Development and Infrastructure Services
Committee 
SEDERUNT 
Councillor Marc Macrae  (Chair)
Councillor Amber Dunbar  (Depute Chair)  
Councillor Peter Bloomfield  (Member)
Councillor John Cowe  (Member)
Councillor John Divers  (Member)
Councillor Jérémie Fernandes  (Member)
Councillor David Gordon  (Member)
Councillor Juli Harris  (Member)
Councillor Sandy Keith  (Member)
Councillor Paul McBain  (Member)
Councillor Shona Morrison  (Member)
Councillor John Stuart  (Member)
Councillor Draeyk van der Horn  (Member)
Councillor Sonya Warren  (Member)  
Clerk Name: Lissa Rowan
Clerk Telephone: 07765 741754
Clerk Email: committee.services@moray.gov.uk 
Page 5

Page 6

Page 6

Page 7

MORAY COUNCIL 
Minute of Meeting of the Economic Development and Infrastructure Services
Committee 
Tuesday, 18 June 2024 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor Peter Bloomfield, Councillor John Cowe, Councillor Amber Dunbar,
Councillor Jérémie Fernandes, Councillor David Gordon, Councillor Juli Harris,
Councillor Sandy Keith, Councillor Graham Leadbitter, Councillor Marc Macrae,
Councillor Paul McBain, Councillor Shona Morrison, Councillor John Stuart,
Councillor Draeyk van der Horn, Councillor Sonya Warren 
APOLOGIES 
Councillor John Divers 
IN ATTENDANCE 
Head of Housing and Property Services, Head of Environmental and Commercial
Services, Acting Head of Economic Growth and Development, Legal Services
Manager and Mrs L Rowan, Committee Services Officer as Clerk to the
Committee.   
1         Chair 
Councillor Macrae, being Chair of the Economic Development and Infrastructure
Services Committee, chaired the meeting.    
2         Pre-election Statement 
The Chair reminded the Committee of the pre-election period and subsequent
restrictions on the Council publishing material showing support for a particular
political party and that, as the meeting was webcast, should the debate become
political, he, as Chair, may need to intervene.  This was noted.   
3         Declaration of Group Decisions and Members Interests 
In terms of Standing Orders 21 and 23 of the Councillors’ Code of Conduct, there
were no declarations from Group Leaders or Spokespersons in regard to any prior
decisions taken on how Members will vote on any item on the agenda or any
declarations of Member’s interests in respect of any item on the agenda. 
With regard to Item 10 "Consultation Response Hitrans Draft Regional Transport
Strategy", for transparency, Councillor Dunbar stated that she was Depute Chair of
Hitrans.  
Item 4
Page 7

Page 8

4         Minute of meeting dated 30 April 2024 
The Minute of the meeting of the Economic Development and Infrastructure
Services Committee dated 30 April 2024 was submitted and approved.   
5         Written Questions 
The Committee noted that no written questions had been submitted.    
6         Order of Business 
In terms of Standing Order 29, the Chair sought the agreement of Committee to
vary the order of business and consider Item 7 "Performance Report (Economic
Growth and Development) - Period to March 2024" and Item 8 "Performance
Report (Environmental and Commercial Services) - Period to March 2024" as the
first 2 substantive items of business.  This was agreed. 
7         Performance Report (Economic Growth and Development) - Period to
March 2024 
Under reference to paragraph 5 of the Minute of the meeting of Moray Council
dated 7 August 2019, a report by the Depute Chief Executive (Economy,
Environment and Finance) informed the Committee of the performance of the
Economic Growth and Development Service for the period to 31 March 2024.  
The Committee joined the Chair in commending the Business Gateway Service for
their performance despite the challenges faced and thereafter unanimously agreed
to note:  
i) performance in the areas of Service Planning, Service Performance and
other related data to the end of March 2024; 
ii) the actions being taken to improve performance where required.   
8         Performance Report (Environmental and Commercial Services) -
Period to March 2024 
Under reference to paragraph 5 of the Minute of the meeting of Moray Council
dated 7 August 2019, a report by the Depute Chief Executive (Economy,
Environment and Finance) informed the Committee of the performance of the
Environmental and Commercial Service for the period to 31 March 2024.  
During discussion surrounding the performance of the various services, the
Committee joined the Chair in commending members of the Harbour staff for
continuing to provide a service whilst awaiting completion of the new Harbour
Office and welcomed the regeneration of Buckie Harbour.  Further commendation
was given for the work undertaken in developing the M Connect Bus Service which
had received positive feedback from local communities.  It was also noted that
Moray Council had ranked highest amongst other Scottish Local Authorities in
Page 8

Page 9

relation to recycled household waste and the Committee joined the Chair in
commending the Environmental Protection/Waste Service for their efforts in this
regard.  
Thereafter, the Committee unanimously agreed to note:  
i) performance in the areas of Service Planning, Service Performance and
other related data to the end of March 2024; 
ii) the actions being taken to improve performance where required.   
9         Economy, Environment and Finance Service Plans 2024-25 
Under reference to paragraph 5 of the Minute of the meeting of Moray Council
dated 28 February 2024, a report by the Depute Chief Executive (Economy,
Environment and Finance) presented the Committee with the Service Plans for
Economy, Environment, and Finance for the year 2024-25. It was noted that the
Financial Services Plan had already been discussed at the Corporate Committee
on 11 June 2024. The Housing and Property Services Plan is scheduled for review
at the Housing and Community Safety Committee on 25 June 2024, while the
Economic Growth and Development Services Plan will also be considered at the
same committee on 25 June 2024, and later at the Planning and Regulatory
Services Committee on 13 August 2024, in accordance with their respective
remits.  
Following consideration, the Committee, as per its remit and noting that further
scrutiny would take place at both the Housing and Community Safety Committee
and the Planning and Regulatory Services Committee, unanimously agreed to
approve the Service Plans for Economic Growth and Development, Housing and
Property Services and Environmental and Commercial Services.   
10         Environmental and Commercial Services and Economic Growth and
Development Services (Economic Development) Revenue and Capital
Budget Monitoring to 31 March 2024 
Under reference to paragraph 5 of the Minute of the meeting of Moray Council
dated 1 March 2023, a report by the Depute Chief Executive (Economy,
Environment and Finance) informed the Committee of the current position
regarding Environmental and Commercial Services and Economic Growth and
Development Services (Economic Development) Revenue and Capital Budgets.  
Following consideration, the Committee unanimously agreed to note the budget
monitoring report for the period to 31 March 2024 (QTR 4).   
11         Road Safety Plan to 2030 
Under reference to paragraph 6 of the Minute of the meeting of this Committee
dated 14 November 2023, a report by the Depute Chief Executive (Economy,
Environment and Finance) sought approval of the draft Moray Road Safety Plan to
2030 which had been subject to further stakeholder consultation, including
Community Councils.  
Page 9

Page 10

Following consideration, the Committee unanimously agreed to:  
i. note the outcome of the stakeholder consultation and changes made to the
draft Road Safety Plan to 2030; and  
ii. approve the revised Road Safety Plan to 2030 as set out in Appendix 1 of the
report.   
12         Consultation Response Hitrans Draft Regional Transport Strategy 
Under reference to paragraph 5 of the Minute of the meeting of this Committee
dated 14 November 2023, a report by the Depute Chief Executive (Economy,
Environment and Finance) informed the Committee of the recently published draft
Hitrans Regional Transport Strategy and the consultation for the draft strategy.  
During discussion, Councillor Dunbar noted an omission in the Council's
consultation response in relation to support for the full dualling of the A9 and A96,
with early prioritisation of the Elgin and Keith bypasses to dual carriageway
standards and suggested the following wording, in line with a statement she had
released in November 2023 as Depute Chair of Hitrans, which was subsequently
agreed by the Committee:  
“The long standing commitment to dual the A96 should be delivered. In particular,
bypassing Elgin, Keith and Nairn would vastly improve the connectivity between
towns, tackle congestion in town centres and address safety and environmental
concerns.  The council remains of the view that the Elgin, Keith and Nairn
bypasses will only be fully effective if they are dual carriageway. This is the only
way to ensure the road safety and strategic connectivity benefits of the scheme
can be realised”.  
During further discussion, it was noted that the Council strongly agreed with Policy
ST3j - The RTS recognises that very low rail service frequency often makes rail
uncompetitive with the car and therefore supports measures which would facilitate
increased rail service frequency, particularly between Inverness and Aberdeen,
Edinburgh and Glasgow and it was queried why this policy did not feature with the
other 3 policies the Council strongly agreed with which were highlighted within the
report.  
In response, the Head of Environmental and Commercial Services advised that the
policies the Council strongly agreed with would feature in a covering note when the
consultation response is submitted and that Policy ST3j would be included.  
Following consideration, the Committee agreed to approve the Moray Council
Response to the Highlands and Islands Transport Partnership (Hitrans) Draft
Regional Transport Strategy subject to: 
i) including of the statement given by Councillor Dunbar in relation the
Council’s support to dual the A9 and A96; and  
ii) the covering note issued with the consultation response including all 4
policies with which the Council strongly agrees.     
Page 10

Page 11

Page 11

Page 12

Page 12

Page 13

REPORT TO:    ECONOMIC DEVELOPMENT AND INFRASTRUCTURE    
SERVICES COMMITTEE ON 3 SEPTEMBER 2024 
SUBJECT: REVIEW OF OUT OF AREA BURIAL CHARGES AND UPDATE
ON CEMETERY MANAGEMENT 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To ask Committee to decide what, if any, amendments should be made to the
exemption criteria for out of area burial charges and inform the Committee of
the proposed plan to manage cemetery infrastructure. 
1.2 This report is submitted to Council in terms of Section III (F) (14) of the
Council's Scheme of Administration relating to the provision of burial services. 
2. RECOMMENDATION 
2.1  It is recommended that Committee: 
(i) consider and note the information relating to the exemption
criteria for out of area burial charges; 
(ii) consider and note the impacts on burial charges from amending
the charging criteria; 
(iii) agree which, if any, amendment/s will be made to the charging
arrangements for out of area burials for inclusion in the burial
charges for 2025/26; and 
(iv)  note the use of the allocated capital funds on cemetery
improvements for 2024/25 and the priority of works for the
management of cemetery infrastructure. 
3. BACKGROUND 
3.1 The current burial charges for 2024/25 were approved by Council on
27 March 2024 (para 4 of the minute refers). The charges were set in line with
achieving full cost recovery for the burial service. 
Item 6
Page 13

Page 14

3.2 Part of the current charging arrangements includes setting a charge for the
burial of people who were not resident in Moray at the time of their death – an
‘out of area’ (OOA) charge.  The principle of an out of area charge is to
ensure that priority for lair space is provided for the residents of Moray, as far
as is practicable.   
3.3 Over the last three years, there has been an average of 41 out of area full
burials and 36 out of area ashes burials per year. 
3.4  The Council currently has a policy position with regards the qualifying criteria
for an exemption to the ‘out of area’ charge. The non-Moray resident fee
(OOA charge) is applied to any person who is not a resident in Moray at the
time of their death, unless: 
• They were receiving any assessment for, or provision of, Community 
Care services from Moray Council – including if this resulted in the 
Council providing new accommodation outside Moray, e.g. community 
care placement in Aberdeenshire. 
• The deceased continued to hold a residence in Moray at the time of 
their death. 
• The deceased had left Moray for personal medical or care reasons 
prior to their death and whose death occurs within 2 years of leaving 
Moray and wish to be buried in the area. 
Review of out of area charge/exemption criteria 
3.5 It has been some time since the out of area policy was fully reviewed, and on
this basis, it was proposed in the Committee report of 27 March 2024 that an
options appraisal would be undertaken to identify other potential exemption
criteria, and the associated cost implications, in line with the provision of a
cost neutral service. Any amendments could then be incorporated into the
charges for 2025/26. 
3.6 Investigations have taken place to compare the exemption criteria for out of
area charges across different local authorities.  It is apparent that there is no
set criteria. The main points raised by both Members and members of the
public, with regards to out of area charges, seem to relate to the following
aspects: 
• Where a person has resided in Moray for a considerable period of their 
life, i.e. 10, 15, 20 years, and have then moved away from Moray but 
still wished to be buried in Moray, but do not meet the current 
exemption criteria. 
• Where a non-Moray resident will be interred into a pre-purchased lair. 
• Where a non-Moray resident will be interred into an existing lair 
(second or third burial). 
3.7 Unfortunately, the information collected as part of the burial administrative
process does not capture how long a person may have lived in Moray prior to
Page 14

Page 15

moving out of the area. Consequently, calculating the impact on burial
charges to take account of the length of time a person resided in Moray
cannot be established.  It should be noted that the Notice of Burial form could
be amended to include the length of time the deceased lived in Moray if this is
deemed necessary to assist with any future decisions regarding out of area
charges. It should be noted and considered that it will always be the case that
someone will not meet the timescale, and therefore be aggrieved at having to
pay higher charges, with regards the length of time that an exemption applies.   
3.8 The Council no longer permits pre-purchasing of lairs.  Therefore, out of area
charges relating to pre-purchased lairs is a legacy issue which will diminish
and fall naturally by the wayside with time. It is therefore considered that this
(existing arrangement), combined with consideration of the relevant fee (see
para 4 below) is the most appropriate way to address the issue of out of area
charges with regards to pre-purchased lairs, without need for further policy
intervention. 
3.9 Data is currently captured with regards the number of second/third interments
which are classed as out of area.  Analysis of the burial data over the last
three years shows that of those who paid an out of area charge each year, on
average 23 were the second, or third, full coffin interments within the lair and
6 were the second, or third, ashes interments within the lair.  The impact of
changing the charge for second and third interments can therefore be
calculated.   
3.10 In summary, amending the exemption with regards the length of time
someone has resided in Moray currently has its challenges and the impacts
cannot be quantified.  The issues around pre-purchased liars with diminish
with time and the impact of amending the exemption to account for
second/third interments can be calculated. 
3.11 It is therefore concluded that revising the policy for exemptions based on time
residing out of Moray is not progressed and that alternative charging
mechanisms are considered accordingly. 
4. Options for Charging 
4.1 Given the data available, the options appraisal has been undertaken on the
following amendments to the charges and exemption criteria: 
Option 1: Making the non-Moray resident charge 50% more than the cost of
the Moray resident fee for the interment and sale of lair charge. 
Option 2: Removing the non-Moray resident charge and having one interment
charge and one sale of lair charge regardless of the residency status. 
Option 3: Removing the non-Moray resident charge and having one interment
charge regardless of the residency status. Still have different lair charges. 
Option 4: Making the non-Moray resident interment fee the same cost as the
Moray resident fee where the interment is a second/third interment in a
lair/ashes plot. 
Page 15

Page 16

4.2 The calculation method used to determine the impact on the burial charges, in
line with the four amendments to the exemption criteria, is the same
methodology used to calculate the cost recovery model (income profiled
rather than blanket percentage across all areas). The data range used to
calculate the impact is the average number of interments/lair sales per year
over the last three years (2021/22 to 2023/24). 
4.3 In order to be able  to establish the impact of any changes, it has been
necessary to compare the impact against the previous year’s charges
(2023/24).  The impact on the lair and interment charges from the
amendments are shown in the tables below: 
Charge 23/24 fee 24/25 fee Option 1 Option 2 Option 3 Option 4
% increases based
on 24/25 charges
shown in brackets  
Interment
& Lair 50%
more than
Moray
resident
Single
charge
regardless
of
residency
status
One
interment
charge,
different
lair
purchase
charge
Non-Moray
charge the
same as
resident
where
2nd/3rd
interment
in a plot
Interment      
Moray Full £1,045 £1,228 £1,271 £1,327 £1,327 £1,272
Non-Moray Full £1,918 £2,254 £1,906 n/a –
charge as
listed
above
n/a –
charge as
listed
above
£2,335 1st
interment
£1,272
2nd/3rd
interment
Moray Ashes
Casket
£247 £290 £300 £313 £313 £301
Non-Moray Ashes
Casket
£561 £659 £450 n/a –
charge as
listed
above
n/a –
charge as
listed
above
£683 1st
interment,
£301
2nd/3rd
interment       
Lair Purchase      
Moray Full £907 £1,119 £1,154 £1,184 £1,119 £1,119
Non-Moray Full £1,920 £2,370 £1,731 £1,184 £2,370 £2,370
Moray Ashes £521 £643 £663 £680 £643 £643
Non-Moray Ashes £1,181 £1,453 £992 £683 £1,453 £1,453 
Impact of options
4.4  As is shown in the data, as the burial service is based on a cost recovery
service, any amendments to the charges for out of area burials will result in an
increase in the Moray resident charges. 
4.5  In 2024/25 the interment charges and sale of lair charges were increased by
18% and 23% respectively.  The increase in the 2024/25 charges (compared
with 23/24), where any of the options  to be included within the out of area
exemption, have been summarised in the below: 
Page 16

Page 17

Options Increase in 2024/25
Moray resident interment
charges (from 2023/24
charge)
Increase in Moray 2024/25
resident lair sale charges
(from 2023/24 charge)
Actual increase
in 2024/25
charges
18% 23%
Option 1 22% 27%
Option 2 27% 31%
Option 3 27% 23%
Option 4 22% 23% 
4.6 The data shows that dependent upon the option, there would have been a
minimum of a 22% increase in the interment charges in 2024/25, and a 27%
or 31% increase in the lair sale charge with regards to options 1 and 2. 
4.7 In considering whether to make any amendments to the exemption criteria, it
should be noted that on average 88% (575 from 652) of interments and 95%
(116 from 122) of lair sales are from Moray residents each year.  A
significantly higher number of people would therefore potentially carry the
burden, and incur higher charges as a result, of any amendment.   
4.8 In terms of the Scottish Local Authority rankings the Council is currently 15th
for the sale of lair charge and 4th for the interment charge. The table below
summarises the impact that the amendments would have on the Council
ranking positions (Charges relate to Moray full resident charges only-not
ashes). 
Options 2024/25 ranking for Moray
resident sale of lair charge
(highest charge ranked
first)
2024/25 ranking for Moray
resident interment charge
(highest charge ranked
first)
Current
Ranking
15th  4th 
Option 1 14th  4th 
Option 2 14th  4th 
Option 3 15th  4th 
Option 4 15th  4th 
4.9 The information in the table shows that options 1 and 2 would result in the
Council moving down the local authority rankings with regards the cost for the
sale of a lair. 
4.10 Burial fees and charges are reviewed annually to reflect and ensure the burial
service is based on cost recovery.  The next review of burial charges will be
presented to Council for approval in early 2025 to be effective from 1 April
2025. 
4.11 It should be noted that the out of area charges relating to the associated
services, ie transfer of lair, have not been included in this exercise, with the
focus being the main interment and lair sale charges.  Given the low value
and low take up of these services it is intended that the current costing profile
Page 17

Page 18

would not be changed should any amendments to the exemption criteria be
approved. 
Options 
4.12 The options available for Members to consider are summarised below: 
• Make no amendments to the current out of area exemption criteria. 
• Approve option 1: Making the non-Moray resident charge 50% more
than the cost of the Moray resident fee for the interment and sale of lair
charge. 
• Approve option 2: Removing the non-Moray resident charge and
having one interment charge and one sale of lair charge regardless of
the residency status. 
• Approve option 3: Removing the non-Moray resident charge and
having one interment charge regardless of the residency status. 
• Approve option 4: Making the non-Moray resident interment fee the
same cost as the Moray resident fee where the interment is a
second/third interment in a lair/ashes plot. 
5. Cemetery Infrastructure 
5.1 A report to this Committee on 30 April 2024 identified the high priority capital
works to be undertaken within the cemetery estate, budget permitting.  A
capital budget of £50,000 has been allocated for cemetery infrastructure
improvements, with a slippage factor in the region of £7,500 reducing the
budget to £42,500 (para 5 of the draft minute refers). 
5.2 The main sites identified for improvements in 2024/25 are shown in the table
below. The above works have been listed in order of priority based on the
health and safety implications associated with the works that need
undertaking. 
Priority
Ranking
based on
Health and
Safety
ground
Cemetery Works being undertaken Rationale for
priority ranking
1 Birnie Cemetery  Wall Repair On going health
and safety
concern and
potential for wall
for collapse and
risk to site users
Page 18

Page 19

Priority
Ranking
based on
Health and
Safety
ground
Cemetery Works being undertaken Rationale for
priority ranking
2 Broomhill Cemetery,
Keith
Drainage & pothole
repairs
On going health
and safety
concern and
potential health
and safety risk
for both foot and
vehicular site
users 
Buckie Cemetery  Pothole repairs On going health
and safety
concern and
potential health
and safety risk
for both foot and
vehicular site
users 
Lossiemouth
Cemetery
Repair entrance surface On going health
and safety
concern and
potential health
and safety risk
for both foot and
vehicular site
users 
3 Buckie New
Cemetery
Land drainage Issue is
temporary in its
nature and
caused by
weather
conditions
4 Duffus Cemetery  Drainage Issue is
temporary in its
nature and
caused by
weather
conditions
5 Kinloss Abbey Repairs to collapsed
boundary fence /
vegetation management  
Area is not open
to the general
public 
Page 19

Page 20

5.3 Quotes are still to be received for the required works and therefore the scope
of what is deliverable at this point is not known.  Indicative costs of £27,500
are anticipated to address the drainage issue at Buckie (to install two paths in
the two lair rows in the worst affected area as well as addressing the pooling
in the lower end of the cemetery).  Given the high value, and that this would
take up a significant proportion of the budget and quotes for the higher priority
works are yet to be received, no works have been commissioned as of yet. 
Should it transpire that there are insufficient funds to carry out all the required
work, then works will need be prioritised and included in future capital
requests, in line with the outcome of the cemetery condition survey. 
5.4 The Council currently has 63 cemeteries that it is responsible for managing
and maintaining.  It is the intention to undertake an infrastructure condition
survey of all the cemeteries in 2024/25.  The information obtained from this
survey will be used inform the prioritisation of future works and, develop a
capital plan for managing cemeteries and, subject to approval, for future
inclusion in the Council’s ten year capital plan.   
5.5 This will ensure that works are undertaken on a planned basis, rather than a
reactive basis, as is currently the case. It will also facilitate the costs of the
works being factored into the charges in line with the full cost recovery model.   
6. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The levying of charges for Council services is an essential component of
delivering Council priorities on a sustainable basis.
Making the burial service a cost recovery service enables the fulfilment
of statutory duties and contributes towards the council priority to build
thriving, resilient, empowered communities. 
(b) Policy and Legal
There are no legal implications arising from this report. 
(c) Financial implications
Should there be consideration of options which do not ensure full cost
recovery in line with policy, it should be noted that:
When the Council approved the budget for 2024/25 on 28 February 2024
(paragraph 7 of the Minute refers) it balanced only by using reserves.
The indicative 3 year budget shows a likely requirement to continue to
make savings in the order of £13 million in the next two years. All
financial decisions must be made in this context and only essential
additional expenditure should be agreed in the course of the year. In
making this determination the committee should consider whether the
financial risk to the Council of incurring additional expenditure outweighs
the risk to the Council of not incurring that expenditure, as set out in the
risk section below and whether a decision on funding could reasonably
be deferred until the budget for future years is approved. 
Page 20

Page 21

In line with a cost recovery service, the financial implication from
amending the exemption criteria would be that the Council would need to
apply higher increases to its Moray resident charges. 
(d) Risk Implications 
The risk implications arising directly from this report are that Moray
residents would be carrying an increased financial burden as a result of
any amendments. 
There is a risk of insufficient budget to deliver all identified infrastructure
works for 2024/25, but these will be prioritised based on safety.  The
proposed infrastructure condition surveys will set out the future direction
on managing these assets.   
(e) Staffing Implications
There are no staffing implications arising directly from this report.   
(f) Property
There are no property implications arising from this report beyond the
works set out in the report. 
(g) Equalities/Socio Economic Impact
There are no equalities implications or implications for the socio-
economic duty arising from this report.   
(h) Climate Change and Biodiversity Impacts
There are no significant climate change or biodiversity impacts arising
from the recommendations of this report. 
(i) Consultations
The Depute Chief Executive (Economy, Environment and Finance),
Head of Environmental and Commercial Service Legal Services
Manager, Head of Financial Services, Principal Accountant, Equalities
Officer, Acting Principal Climate Change Strategy Officer, Open Space
Manager and Democratic Services Manager have been consulted and
their comments incorporated into the report. 
7. CONCLUSION 
7.1  Committee is asked to decide what, if any, amendments are to be made       
to the out of area exemption criteria for inclusion in the 2025/26 burial 
charges. 
7.2  Committee is asked to note the priority of works with regards to
cemetery management. 
Author of Report: Paul Wolverson, Service Manager 
Background Papers: 
Ref: SPMAN-524642768-1113
Page 21

Page 22

Page 22

Page 23

REPORT TO:    ECONOMIC DEVELOPMENT AND INFRASTRUCTURE    
SERVICES COMMITTEE ON 3 SEPTEMBER 2024 
SUBJECT: MOYCROFT DEPOT PROJECT 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform Committee of the completion of the Moycroft Depot Integration
project. 
1.2 This report is submitted to Council in terms of Section III (F) (22) of the
Council's Scheme of Administration relating to the arrangements for waste
management, street sweeping, refuse collection and refuse disposal including
recycling. 
2. RECOMMENDATION 
2.1 It is recommended that Committee consider and note the contents of the
Moycroft Depot Integration report and the successful completion of the
project. 
3. BACKGROUND 
3.1 The project was initiated in 2015 with the aim of delivering an integrated
waste management facility that combines waste handling and sorting facilities
in one location, and, future proofs waste transfer facilities to meet the needs
of transferring waste to Aberdeen to the new Energy from Waste facility
(EfW). As a strategic project, the end of project report was reviewed by
CMT/SMT on 20 May 2024 and referred to this Committee for noting in line
with the council’s Project Management guidelines. 
3.2 Approval was given to invest £3,023,000 in a new Integrated Waste
Management facility at Moycroft with the following objectives: 
• To extend the waste handling capacity to deal with waste transfer to 
Aberdeen (NESS) Energy from Waste facility post 2020 when the 
organic waste ban comes into force. 
• To reduce costs (£750k) for porta-cabin replacement at Ashgrove for 
Roads staff by moving Waste staff located at Ashgrove to Moycroft.
Item 7
Page 23

Page 24

• To avoid long term lease costs at Brumley Brae Depot and transfer 
these operations to Moycroft. 
• To avoid potential enforcement action from Environmental Health 
because of statutory nuisance associated with the premise in 
Lossiemouth by relocating operations to Moycroft. 
and which would provide the following benefits: 
1. Rehouse Moray Reach Out - Recycling operations from Lossiemouth to
Moycroft.
2. Transfer Collection operations and staff from Brumley Brae to Moycroft.
3. Extend the waste transfer facilities at Moycroft to accommodate the
additional waste handling capabilities required once the new EfW plant is
operational in 2022.
4. Transfer Waste staff from Ashgrove Depot to Moycroft and Moray training
to the Annex HQ to facilitate the relocation of Roads staff from a poor
condition office accommodation into the vacated space thus avoiding a
new build in Ashgrove.   
3.3 Achievement against the objectives is set out in para 3.1 of the Project
Closure Report (APPENDIX 1 note: Appendix A and B referenced in
Appendix 1 have been uploaded to CMIS as an additional meeting
document). The benefits listed above were monitored through the project
lifecycle, and the planned targets were achieved, though there was an
amendment to point 4 within the project. There was also delay in the project
being completed until November 2020.  The delays were due to external
factors outside the Council’s control, such as COVID 19 and the reliance on
external contractors connecting water supplies.   
3.4 Whilst the actual build was finished in November 2020, discussions were still
on-going with the contractor with regards the final bill for some time.  The final
bill was settled in 2023/24 resulting in the project being complete. Whilst the
final bill was less than estimated, there still was an overall project overspend
of £243K, reducing to £52K when taking into account the unplanned
exceptional costs.   
3.5 For a project of this size, budget and complexity a variance of 1.76% on
planned activity and 8.24% overall is considered to be acceptable. Whilst the
project is slightly over budget this is a reflection of the challenges experienced
throughout the term of the project. 
3.6 Since the new site has been operational some of the improvements to the
waste and recycling service includes: 
• Improved resilience with regards legislative compliance
• Improved depot rationalisation
• Improved facilities for staff
• Improved efficiencies within the service 
Page 24

Page 25

3.7 One issue still remains outstanding. This relates to the cyclepath which
crosses the site which currently remains closed.  The acquisition of the land
which borders the site is still being progressed. This is taking some time
because of complexities in terms of the land under negotiation. Following the
acquisition, this land will be used as a parking area and at that point the
cyclepath can be safely reopened.  It is anticipated that this remaining action
point will be completed within 2024/25.   
3.8 A copy of the Moycroft Depot Integration end of project report is shown in
APPENDIX 1. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The provision of refuse and recycling services is a mandatory function. 
Ensuring that the Council has modern infrastructure in place to support
these mandatory services contributes towards the council’s priority to
build thriving, resilient, empowered communities. 
(b) Policy and Legal
There are no legal implications arising from this report. Waste arisings
remain within the existing volumes in the Waste Management License,
any increase in license capacity will be progressed in relation to other
matters relating to POPs. This element is now being managed as part of
business as usual. 
(c) Financial implications
There are no financial implications arising directly from this report. 
(d) Risk Implications 
The risks associated with this project were identified and addressed as
part of project. 
(e) Staffing Implications
There are no staffing implications arising directly from this report.   
(f) Property
There are no property implications arising from this report. 
(g) Equalities/Socio Economic Impact
There are no equalities implications or implications for the socio-
economic duty arising from this report.   
(h) Climate Change and Biodiversity Impacts
The project reduced transfer of mixed plastics from Moycroft to
Lossiemouth with subsequent reduction in mileage and vehicle
emissions. 
(i) Consultations
The Depute Chief Executive (Economy, Environment and Finance),
Head of Environmental and Commercial Services, Legal Services
Page 25

Page 26

Manager, Head of Financial Services, Principal Accountant, Equalities
Officer, Acting Principal Climate Change Strategy Officer, Waste
Manager, Senior Project management Office Administrator, Property
Asset Manager and Committee Services Officer (L Rowan) have been
consulted and their comments incorporated into the report. 
5. CONCLUSION 
5.1 Committee is asked to consider and note the contents of the report and
the completion of the Moycroft Depot Integration project. 
Author of Report: Paul Wolverson, Service Manager (Waste & Recycling,
Open Spaces and Facilities Management) 
Background Papers: 
Ref: SPMAN-524642768-1129
Page 26

Page 27

End of Project Report – Stage 5
Page 1 of 21 
The following template has been developed with headings and subheadings that should
ideally be used when creating the End of Project Report.   Guidance text has been added
below each section to assist you through the process (this should be deleted before
submission).  If you need assistance with any part of this template then please refer to the
Green Guidance Document
PROJECT REF/NAME Moycroft Depot Integration
PROJECT SPONSOR Stephen Cooper
COMPLETED BY Colin Bell
DATE 1 June 2021 (updated 13/05/24)
Project Category 
(Choose from drop
down list) 
Strategic
Summary • Summary of project performance
Delivery of an integrated waste management facility within budget that:  
• Combines waste handling and sorting facilities in the one location
• Future proofs waste transfer facilities to meet the needs of
transferring waste to Aberdeen once the new Energy from Waste
(EfW) facility is built. 
• Rehouses Moray Reach Out - Recycling operations from
Lossiemouth to Moycroft
• Transfers Collection operations and staff from Brumley Brae to
Moycroft
• Extends the waste transfer facilities at Moycroft to accommodate
the additional waste handling capabilities required once the new
EfW plant is operational in 2022. 
Schedule Original
Planned end
date
05/08/19 Actual end
date
03/11/20
Funding Original
Planned
budget
£3,023m Actual spend £3,190m
Item 7
Page 27

Page 28

End of Project Report – Stage 5
Page 2 of 21 
Table of Contents
1. Report Purpose ......................................................................................... 3
2. End of Project Report Summary ............................................................... 3
2.1 Project Background Overview ............................................................. 3
3. Project Objectives ..................................................................................... 4
3.1 Objectives Achieved ........................................................................... 4
3.2 Objectives Outstanding ....................................................................... 5
4. Project Performance ................................................................................. 5
5. Benefits ..................................................................................................... 6
5.1 Benefits Achieved to Date ................................................................... 6
5.2 Benefits not Realised .......................................................................... 8
5.3 Residual Benefits Expected ................................................................ 8
5.4 Expected Net Benefits ........................................................................ 8
5.5 Measurement of Benefits still to be Realised ...................................... 8
6. Changes Requested, Risks and Issues .................................................... 8
6.1 Significant Risks and Issues Outstanding ........................................... 9
7. Milestone and Deliverables Performance ............................................... 10
7.1 Project Schedule Overview ............................................................... 10
7.2 Project Schedule Corrective Actions ................................................. 10
8. Budget Performance ............................................................................... 11
8.1 Financial Efficiencies ........................................................................ 11
9. Project Governance and Quality Management ....................................... 13
9.1 Governance ...................................................................................... 14
9.2 Planning and Control ........................................................................ 14
9.3 Stakeholder Management ................................................................. 15
9.4 Supplier and User Management ....................................................... 15
9.5 Quality Management ......................................................................... 15
9.6 Risk and Issue Management ............................................................ 16
10. Lessons Learned .................................................................................... 16
10.1 What went well .................................................................................. 17
10.2 Summary of Implications ................................................................... 17
11. Follow on Actions .................................................................................... 19
11.1 Post Project Tasks ............................................................................ 19
12. Project Closure ....................................................................................... 19
12.1 Conclusion ........................................................................................ 20
12.2 Project Closure Recommendations .................................................. 20
13. Version History ....................................................................................... 20 
Page 28

Page 29

End of Project Report – Stage 5
Page 3 of 21 
1. Report Purpose
This End of Project Report is the final Project Gateway document produced
and should aim to assess the success of the project, identify best practices for
future projects, resolve all open issues, and formally close the project.   
This Project Closure Report should address the following: 
• Review and validate the milestones and success of the project
• Confirm outstanding issues, risks, and recommendations
• Outline tasks and activities required to close the project
• Identify project highlights and best practices for future projects 
2. End of Project Report Summary
2.1 Project Background Overview
The project initiated in 2015 with the aim to deliver an integrated waste
management facility that combines waste handling and sorting facilities in the
one location and future proofs waste transfer facilities to meet the needs of
transferring waste to Aberdeen once the new EfW facility is built. 
Approval was given to invest £3.3m in a new Integrated Waste Management
facility at Moycroft over a 2 year build programme which would provide the
following: 
1. Rehouse Moray Reach Out - Recycling operations from Lossiemouth to
Moycroft
2. Transfer Collection operations and staff from Brumley Brae to Moycroft
3. Extend the waste transfer facilities at Moycroft to accommodate the
additional waste handling capabilities required once the new EfW plant
is operational in 2022.
4. Transfer Waste staff from Ashgrove Depot to Moycroft and Moray
training to the Annex HQ to facilitate the relocation of Roads staff from
a poor condition office accommodation into the vacated space thus
avoiding a new build in Ashgrove.   
Links to Committee Report and the Full Business Case
• 20151020 Waste Strategy Consolidation Committee Report
• 15-0023 Moycroft Depot Integration Full Business Case 
Page 29

Page 30

End of Project Report – Stage 5
Page 4 of 21 
3. Project Objectives 
The objectives set at the Business Case stage of this project were: 
• To extend the waste handling capacity to deal with waste transfer to
Aberdeen (NESS) Energy from Waste facility post 2020 when the
organic waste ban comes into force. 
• To reduce costs (£750k) for porta-cabin replacement at Ashgrove for
Roads staff by moving Waste staff located at Ashgrove to Moycroft: 
• To avoid long term lease costs at Brumley Brae Depot and transfer
these operations to Moycroft: 
• To avoid potential enforcement action from Environmental Health
because of statutory nuisance associated with current premise in
Lossiemouth by relocating operations to Moycroft.
3.1 Objectives Achieved
Give details of the objectives that have been met and explain the process of
achieving them. 
• To extend the waste handling capacity to deal with waste transfer
to Aberdeen (NESS) Energy from Waste facility post 2020 when
the organic waste ban comes into force. (The ban on sending
BMW to landfill has since been deferred until 2025).   
The building of the extension to the existing Waste Facility has been
completed and has the operational capacity required to act as a Waste
Transfer Station for the NESS facility when it becomes operational. 
• To avoid long term lease costs at Brumley Brae Depot and
transfer these operations to Moycroft 
Staff, equipment and vehicles have been transferred from Brumley
Brae to the new Moycroft facility and the lease terminated on 30/10/20
and former site handed back to owner. 
• To avoid potential enforcement action from Environmental Health
because of statutory nuisance associated with current premise in
Lossiemouth by relocating operations to Moycroft. 
Operations have ceased at Lossiemouth and equipment transferred to
Moycroft and site handed back to Property Services.
Page 30

Page 31

End of Project Report – Stage 5
Page 5 of 21 
3.2 Objectives Outstanding
• To reduce costs (£750k) for porta-cabin replacement at Ashgrove
for Roads staff by moving Waste staff located at Ashgrove to
Moycroft 
This was not achieved as the R&D survey for the porta cabin in November
2018 identified that the entire cabin had an Artex asbestos coating. This
significantly increased the overall costs of the project making it no longer
viable. A change to remove this from project specification was agreed as a
result of the high cost of tender returns i.e. the essential works to roof and
ramps instead of office reconfiguration. 
However the Waste team were relocated from Ashgrove to Moycroft and
the Moray Training team relocated to HQ to allow the remedial work and
reconfiguration of the office to take place. 
Work has been completed and Ashgrove is operational for the remaining
staff pending the outcome of the Moray Council wide depot review. 
4. Project Performance
Governance of the project was achieved by setting up a project board. Project
board meetings informed by highlight reports managed progress and
significant issues and risks. 
Risks, issues and changes were logged, monitored and reviewed on a regular
basis. 
All planned targets were achieved apart from the delivery, which was delayed
due to a number of external factors. The water connection was delayed a
number of times by the contractor, which pushed the completion back but then
the Covid19 pandemic impacted further with an enforced site closure and then
knock on impacts on suppliers. 
This project was complete in November 2020 but discussions were still
ongoing with the contractor to agree the amount of the final bill. In 2022/23 an
estimate of the amount was made and accrued.  The final bill has been settled
resulting in the project now being complete. Whilst the final bill was less than
estimated, there still was an overall project overspend  of £243K, reducing to
£52K when taking into account the unplanned exceptional costs.   
For a project of this size, budget and complexity a variance of 1.76% on
planned activity and 8.24% overall is deemed to be acceptable. Whilst the
Page 31

Page 32

End of Project Report – Stage 5
Page 6 of 21 
project is slightly over budget this is a reflection of the challenges experienced
throughout the term of the project. 
5. Benefits
The Benefits as per Benefits Realisation Plan.
5.1 Benefits Achieved to Date
The primary benefits achieved throughout the project were: 
No. Benefit Owner Measures Notes
1. Create
centralised
service unit
Colin Bell Completed
and
operational
Waste
Transfer
Station 
As per End of Project Report
2. Reduced
travel
Waste
Manager
Monitoring
and
reporting
The removal of transfer of
mixed plastics from Moycroft to
Lossiemouth.  
3. Maintain and
increase
provision &
capacity
Waste
Manager
Monitoring
and
reporting
Variation to be made for the
WML with SEPA to increase
annual handling capacity at
Moycroft. 
4. Increase use
of office space
Colin Bell Survey Office space has been
rationalised by moving staff to
one main Waste depot in Elgin.
Depot rationalisation project is
ongoing. 
5. Create
improved staff
conditions
Waste
Manager
Staff
Satisfaction
Survey
No baseline data available but-
the purpose of exercise was to
establish whether there had
been improvements in site
facilities. Staff Survey issued to
all waste personnel (cira 100)
following 6 months of operating
within the new Moycroft facility.
15 response received (approx.
15% response rate)
Page 32

Page 33

End of Project Report – Stage 5
Page 7 of 21 
An overall percentage of 74% of
positive responses.   Whilst the
return rate was low the data
would would suggest that staff
had seen improvement in their
working environment. 
6. Eliminate
complaints
about the
operation at
Lossiemouth
by relocation
of the MRF to
Moycroft 
Colin Bell No further
complaints
received
Achieved. 
7. Maintain
Legislation
Compliance
Waste
Manager
Change to
WML &
Monitoring
Ensuring Moycroft is equipped
to cater for forthcoming
changes in legislation (landfill
ban).  
8. Eliminate
current &
potential
environmental
problems
Waste
Manager
Change to
WML &
Monitoring
SEPA site monitoring delayed
due to C-19 restrictions. 
Change to WML to be
progressed following resolution
of the SEPA Cyber Attack ( SEPA
experience a cyber attack which
affected their file management
system-effectively circa 4000
licences/permits/document
erased from their system).
Revised WML to be completed
by end of 2024 in accordance
with approval from SEPA.  SEPA
have inspected the site and
confirmed the site is compliant. 
9. Reduction in
number of
depots
Waste
Manager
Closure of
redundant
depots 
Reported to AMWG 
Page 33

Page 34

End of Project Report – Stage 5
Page 8 of 21 
5.2 Benefits not Realised 
Please highlight any benefits that have not been realised along with an
explanation as to why and decide whether any follow-up action has to be
taken in such cases. 
Give an understanding and document why particular benefits were not
achieved and provide lessons learned for future programmes or projects. 
Benefit 3 - Maintain and Increase Provision & Capacity.   
This benefit is noted here for the purpose of providing an update on current
position in the overall process. It hasn’t been progressed yet for valid reasons,
and not as a result of failures within the project aims.   
The total waste arrisings for Moray remain within permitted licence volumes at
present. Therefore, licence modification will be progressed at the start of
2024. There is an increased cost associated with adding additional annual
tonnage to the licence and so there is merit in holding this back until the most
appropriate time. Pertaining to a recent change in legislation in another area
of the service we’ll need to submit a licence modification at the start of 2024
and so the tonnage increase will be included then. 
5.3 Residual Benefits Expected 
None expected. 
5.4 Expected Net Benefits 
None expected. 
5.5 Measurement of Benefits still to be Realised 
None to report. 
6. Changes Requested, Risks and Issues
A comprehensive list and explanations of the significant Changes, Risks and
issues are listed in Appendix A: Changes Risks and Issues. A flavour of the
changes, risk and issues include: 
• Revised project timescales (change)
• Project capital costs (risk)
Page 34

Page 35

End of Project Report – Stage 5
Page 9 of 21 
• COVID 19 Pandemic (issue) 
Completion of the project was primarily delayed due to the impacts of the
COVID 19 pandemic.  This impacts included: 
• Restriction to carry out the construction works on site 
• Ability of third party utility suppliers to undertake the relevant work on
site
• Settlement negotiations resulting from additional costs in order to
comply with COVID restrictions 
6.1 Significant Risks and Issues Outstanding
Please provide details of any significant outstanding risks or issues with
particular attention given to the owner and target dates for their mitigation /
resolution.
1.1.1 Risks
There are no outstanding Risks
2.1.1 Issues 
Issue Red /
Amber
Description  Owner Target Date
146 Amber Cycle Path – The works
associated to prevent the need
for vehicles crossing the cycle
path remain underway. The
proposal is to relocate the
vehicular access / egress to the
parking area of the facility. In
order to achieve this the Council
have to acquire some land which
is near completion. Once
acquired, works will be
programmed to create the
alternative opening. When
vehicular movements are no
longer crossing the cycle path,
the path will be formally
M Neary 30.06.24
Page 35

Page 36

End of Project Report – Stage 5
Page 10 of 21 
adopted and open to members
of the public. 
7. Milestone and Deliverables Performance
7.1 Project Schedule Overview
The business case for the project was approved on 01/09/2017 with the
proposed timescales of (01/03/17 to 18/10/19). 
Description or name of Milestone Planned
completion
date
Actual
completion
date
Temporary Decants from Moycroft 26/08/19 03/11/20
Construction of New Build Design to procurement 30/04/19 22/11/18
Mobilisation  18/06/18 21/12/18
Building On Site 07/03/19 08/02/19
Office/Warehouse Build completed 30/04/19 02/10/20
External Works Competed 25/04/19 13/10/20
Construction of New Build complete 30/04/19 03/11/20
Moray Training Relocation from Ashgrove 19/04/18 19/10/18
Brumley Brae End of Lease and Handover 02/09/19 30/10/20
Lossiemouth Materials Recycling Facility
Transferred to Moycroft, End of Lease and
Handover
18/10/19 28/12/20 
7.2 Project Schedule Corrective Actions
Give details of any causes for project slippage with the corresponding
risk/Issue reference where appropriate, and the corrective actions used.  If
any corrective actions resulted in a change request then please provide
details of the change reference. 
The water connection was delayed a number of times by the contractor, which
pushed the completion back but then the Covid19 pandemic impacted further
with an enforced site closure and then knock on impacts on suppliers.
Refer to Appendix A: Changes Risks and Issues for details 
Page 36

Page 37

End of Project Report – Stage 5
Page 11 of 21 
8. Budget Performance
Details of financial information along with the original financial case from the
Business Case.
8.1 Financial Efficiencies
The summary table shows  an overspend of £243K which is 8.24% of the
project budgetreducing to £52K when taking into account the unplanned
exceptional costs (1.76% of the project budget) 
For a project of this size, budget and complexity a variance of up to10% is
deemed to be acceptable. 
The following summary of figures are from Appendix B Financial Report of
01/12/2023: 
Moycroft Recycling Centre
Development          
Project 31137      
01/12/2023- date changed by PW to avoid confusion with spreadsheets which showed the same
dates but different information                
SERVICE          
Origin
al
Revise
d Spend to
Variat
ion          
Budge
t
Budge
t Date
to
Budge
t  
£'s £'s £'s £'s                       
CHAP Construction Works
2,029,
140
2,029,
140 2,682,015
-
652,8
75        
CHAP Construction Contingency (5%)
101,4
60
101,4
60 0
101,4
60        
Additional Costs
409,0
00
223,6
24 0
223,6
24        
Architects Instructions    0         
Variations to works             
Variations to works - Slabs
70,00
0 0 0 0        
Variations to works - Weighbridge  
64,63
9 81,111
-
16,47
2  
Variations to works - Additional Bins
& Foundation  
86,00
0 0
86,00
0  
Variations to works - Waste watchers
Additional Cost  
50,00
0 0
50,00
0  
Page 37

Page 38

End of Project Report – Stage 5
Page 12 of 21 
Variations to works - Green Waste
Shredder   
35,00
0 0
35,00
0  
Variations to works - Safe Passage Car
Park / Depot  
18,11
9 35,913
-
17,79
4  
Variations to works - telecoms & Wi-
Fi   500 2,425
-
1,925        
Variations to works - overstated
heater cost       
Variations to works - damage to roller
door to be recharged       
Variations to works - double count
Cycle path cost       
Fire Suppression System    20,183         
Service Charge             
- Site Investigation
16,56
6
19,68
1 19,681 0             
- Water Connection 2,000 2,000 13,608
(11,6
08)             
- Telephone (IT) 7,000 7,000 0 7,000             
- Misc 166 110 110 0                       
TOTAL EXCLUDING FEES
2,635,
332
2,637,
273 2,855,046
-
197,5
90                       
Property Services Fees
285,7
05
285,7
05 317,301
-
31,59
6  
Building Control Fee 8,922 8,922 6,746 2,176        
Misc  0 7,358 3,691 3,667        
Contingency non CHAP
17,04
1 7,742 0 7,742                       
TOTAL INCLUDING FEES
2,947,
000
2,947,
000 3,182,785
-
215,6
02              
-7,076           
£k £k
Original Budget    3,032
Transfer to related projects    (85)
Project Budget    2,947       
Estimated Project Spend    3,190       
Project (overspend) / Underspend   (243)
Page 38

Page 39

End of Project Report – Stage 5
Page 13 of 21 
% of Total Budget    (8.24)%       
Exceptional Costs:     
Estimated CHAP Disruption Claim (as per QS email) 75  
Cycleway & Vehicle Parking O/spend  18  
Additional CCTV Cameras   6  
Repair Faulty Roller Door   10  
Increase cost of Storm Water Attenuation  52  
Water Bowser Tankers Off Hire   10  
Diesel generator Off Hire   20        
191       
Project (overspend) / underspend excluding above examples (52)       
It should be noted that whilst every effort has been made to reconcile the
figures, there is an imbalance of £7076 between the project costs shown in
the project table above (£3,182,785) and the total estimated project spend
(£3,190,000 rounded up).  The estimated spend represents the projects costs
shown on the financial system and as shown in the detail transactions tab on
the financial report in appendix B. 
The below are all factors that have contributed to the two figures not being
able to be reconciled: 
• The length of time the project has taken to complete
• Key accountancy staff, who managed and produced the financial tables
below, have now left the Councils employment
• The lack of understanding of how some of the figures in the table have
been calculated as they are not formulated
• The detailed knowledge base of the overall project costs is not within
the remaining accountancy or waste staff 
The project is over budget for the following reasons:
• Delays primarily due to the service utilities connectivity issues, 
• The Covid 19 Pandemic impacted on site works, suppliers and
materials and required the schedule to be revised outwith the original
planned project period. 
• Significant project with unknowns which required variations throughout
the lifecycle added some costs.
9. Project Governance and Quality Management
Page 39

Page 40

End of Project Report – Stage 5
Page 14 of 21 
Details of the governance, processes and procedures that were employed to
assure the quality of the project and deliverables, (This should include details
from the Management Case from the Full Business case and Project Initiation
Document) along with details of any deviation from that plan with explanations
and justifications. 
In particular this section should also include recognition for good performance
from project team members.
9.1 Governance
Governance of the project was achieved by setting up a project board, which
met monthly throughout the project comprising of: 
Name Role
S Cooper SRO
C Bell Project Manager / Senior User
M Neary Stakeholder / User / Delivery
M MacLeod Supplier
P Connor Finance Lead
M Aldridge PMO 
Project board meetings informed by highlight reports to manage and monitor
progress and significant issues and risks. 
Risks, issues and changes were logged, monitored and reviewed on a regular
basis. 
All planned targets were achieved apart from the delivery, which was delayed
due to a number of external factors. The water connection was delayed a
number of times by the contractor, which pushed the completion back but then
the Covid19 pandemic impacted further with an enforced site closure and then
knock on impacts on suppliers.
9.2 Planning and Control
How effective was the planning and control of the project?  Did it follow the
plan set out in the Business Case?  If not, why? 
Despite the duration of the project and changes in the project team the
planning and control of the budget were effectively governed by the Project
Board.
Page 40

Page 41

End of Project Report – Stage 5
Page 15 of 21 
9.3 Stakeholder Management
Give an overview of how stakeholder planning took place during the project
lifecycle and give details of any issues. 
The organisations and people who had an interest or role in the project were
engaged throughout the life cycle of the project by the most appropriate form
of communication for the message and audience e.g.  meetings, telephone
calls, e-mails and a series of newsletters. 
As the duration of the project spanned a number of years and members of the
project board and stakeholders changed it was particularly important to
maintain effective levels of communication.
9.4 Supplier and User Management
Provide details on supplier and user management and explain any issues that
may have arose. 
The water connection was delayed a number of times by the contractor, which
pushed the completion back but then the Covid19 pandemic impacted further
with an enforced site closure and then knock on impacts on suppliers. 
Operational procedures and risk assessments were updated and staff based
at the depot were inducted on the safe use of the depot via tool box talks, site
walkarounds, and team briefings. 
9.5 Quality Management
Give details of how effective the quality management was throughout the
project along with details of any problems and changes needed:- 
• Regular weekly inspections were carried out by the Property Clerk of
Works Service – any issues identified are then brought to the attention
of both the Contractor and Contract Administrator;
• Regular site meetings were held on site with the Contractor; Clerk of
Works and all consultants and involved a site inspection prior to the
meeting to identify any issues and raise them in the meeting. Any
additional detail was inspected and discussed following the meeting.
• Consultants in their own specialisms carried out inspections of their
relevant disciplines and all instructions were processed through the
Contract Administrators instruction process.
Page 41

Page 42

End of Project Report – Stage 5
Page 16 of 21 
• The Contractor also has responsibility for monitoring the quality of his
and his sub-contractors workmanship in order to comply with the
contract which he has signed for the project. 
Problems and Changes Needed:- 
• Complications arose in relation to drainage and other utility services
running under the site and not always in accordance with record
drawings. This required changes to the original drainage design layout.
• Work was also required to reconcile the design of the foundations and
the push walls interface details including in relation to the existing site
and building levels. Due to the forces acting on the push walls the
relationship between the walls; foundations and site levels were critical
in forming a successful installation.
• Some amendments to the original design were also required to
accommodate changing Client plans for weighbridge installation and
MRF recycling line equipment.
• Scottish Water connection proved to be a complicated affair to get
finalised and included several different versions of connecting the site
to the new supply emanating from Scottish Water.
• Scottish and Southern Electricity also varied their own designs for the
new electricity connection after deciding the cable they were originally
going to connect to was in fact a private supply and this could not be
used for the connection. This meant we had to involve Scottish Gas
Networks due to relative service distances and wayleave requirements.
• The cycle path crossing was deemed unfit for purpose and following
consultation with HSE extensive additional safety measures were
introduced and will be undertaken by Traffic section and agreed as out
of scope for the Moycroft project. 
9.6 Risk and Issue Management
Give an overview of how risks and issues were identified, scored and
managed throughout the project lifecycle.   
Risks were primarily identified by members of the project board from their
roles and perspectives. Risks were formally discussed, scored, reviewed and
agreed at the monthly project board meeting based on Likelihood and Impact.
Mitigations were then initiated where possible and risks monitored until
conclusion. 
10. Lessons Learned
Page 42

Page 43

End of Project Report – Stage 5
Page 17 of 21 
10.1 What went well
Give details of best practice that can be taken forward onto new projects.  Did
the changes made become embedded? 
• The need for good governance via a project board and the application
of established project management structure, processes methods and
experiences of the project board and stakeholders.
• Effective teamwork, people working in collaboration towards a common
goal.
• Clarity of roles – ensured that those involved in the project are clear on
their roles. 
• Training & development – at the start of the project, some members of
the team attended Association of Project Management training.
• Regular and structured project board meetings.
• The need to review situation throughout project lifespan.
• The need to constantly identify risks and issues score them and
manage then effectively. Then instigate changes where required.
• Health and Safety Management – The identification, management and
minimising of threats to those affected by the work throughout the life
cycle of the project. 
The examples of best practice above became embedded and are
transferable to other projects.
10.2 Summary of Implications
Give details of what didn’t go well throughout the project and give thoughts on
how future projects could avoid the same implications and rate their impact on
the project as high, medium or low. 
The list below is a summary of the key lessons learned: 
Lesson
No.
Lesson
Description
Suggested future
action
Project
Impact
(H, M,
L)
1.0  The need for robust
stakeholder management
and involvement (Waste
staff, Moray Reach Out,
staff)
Ensure that staff at all
levels of the organisation
are engaged on the
design and project
scope. Don’t assume that 
H
Page 43

Page 44

End of Project Report – Stage 5
Page 18 of 21 
Lesson
No.
Lesson
Description
Suggested future
action
Project
Impact
(H, M,
L)
designers and end users
understand what you
require.
2.0 Consistency of project
board staff
The need to manage the
turnover of key staff
throughout the project to
ensure consistency –
especially important for
projects that have a long
timeline. 
Ensure that thorough
notes and knowledge
based documents are in
place.  This will facilitate
a smooth handover
process should key staff
leave part way through a
a project 
H
3.0 Supplier management of
public utilities
This is not the first
project that it has proved
exceptionally difficult to
manage the performance
and delivery of the PU’s. 
H   
4.0  Investment of time in a
robust well defined project
scope is time well spent
as it will save time in the
long term.
Ensure that a clear
project scope is
prepared. Clear goals
and objectives are very
important.
M
5.0  Clarity of  roles Ensure that all members
(project sponsors, project
managers and team
members) involved in the
project have clearly
defined roles and
sufficient time to perform
them.
H
Page 44

Page 45

End of Project Report – Stage 5
Page 19 of 21 
Lesson
No.
Lesson
Description
Suggested future
action
Project
Impact
(H, M,
L)
6.0  Robust Interpersonal skills The good attitude, mutual
trust and respect of those
involved helped us face
the many challenges
throughout the project in
a positive and
constructive manner.
M
7.0  Effective communication This was necessary to
ensure that
misunderstood
requirements, unclear
goals, alienation of
stakeholders were kept
to a minimum. 
H
8.0 Extended involvement to
the Councils H&S Team
To make sure internal
H&S colleagues are
engaged throughout the
entire project to seek
their views / guidance on
changes and challenges
as they occur. This will
prevent the need for
reactive alterations to
implemented action. 
H
11. Follow on Actions
11.1 Post Project Tasks  
All tasks complete. 
12. Project Closure 
Page 45

Page 46

End of Project Report – Stage 5
Page 20 of 21 
12.1 Conclusion
The project took considerably longer than anticipated due to a number of
issues, the most significant being Covid-19, concerns from HSE re cycleway
issues with public utilities and changes to design that are to be expected with
at the delivery of a project of this size, budget and complexity. 
Stakeholders were engaged throughout the delivery of the project. 
The project board met on a monthly basis and worked well as a team to
deliver an integrated depot that has realised most of the benefits and
objectives that were set at the outset. 
12.2 Project Closure Recommendations
• Recommendation 1
That it is noted that the depot is fully operational and that the benefits
and objectives of the project have been successfully realised. 
• Recommendation 2 
That others involved in the delivery of similar projects learn from the
lessons learned and what went well and not so well. 
With the exception of the above tasks, please give details of what the project
has achieved to date. 
The depot is now fully operational. However, as with any frontline
operations works continue to identify opportunities for further
refinements, improvements and ways to continuously improve the
service. 
13. Version History 
Version Date Details
0.1 01/12/20 Draft report created by Mark Aldridge
0.2 01/06/21 Report updated by Colin Bell.
0.3 01/06/21 Report updated by Mark Aldridge 
0.4 02/06/21 Draft finalised for distribution to board.
0.5 21/11/23 Reviewed and updated from operational perspective
with only final accounts to be inserted. 
Page 46

Page 47

End of Project Report – Stage 5
Page 21 of 21 
0.6 13/05/24 Updated after review by Transform Ecomony Board
of 04/03/24 
Page 47

Page 48

Page 48

Page 49

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 3 SEPTEMBER 2024 
SUBJECT: ENVIRONMENTAL AND COMMERCIAL SERVICES AND
ECONOMIC GROWTH AND DEVELOPMENT
SERVICES (ECONOMIC DEVELOPMENT) REVENUE AND
CAPITAL BUDGET MONITORING TO 30 JUNE 2024 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the current position regarding Environmental and
Commercial Services and Economic Growth and Development Services
(Economic Development) Revenue and Capital Budgets. 
1.2 This report is submitted to Committee in terms of Section III (A) (2) of the
Council’s Scheme of Administration relating to the consideration of Revenue
and Capital Budgets and long term financial plans. 
2. RECOMMENDATION 
2.1  It is recommended that Committee considers and notes the budget
monitoring report for the period to 30 June 2024 (Quarter 1). 
3. BACKGROUND 
3.1 The Performance Management Framework 2020 (page 27) requires that
progress against Capital and Revenue Expenditure and the Capital Plan is
reported to the relevant Service Committee. 
3.2 This report has taken a revised approach to reporting, building on the quarter
4 23/24 report, to provide clearer detail on budget, expenditure, income and
variances for the services. This will be built on for future reports with
appendices setting out trends and other analysis on key areas, especially
those services that generate income.
Item 8
Page 49

Page 50

4. ENVIRONMENTAL & COMMERCIAL SERVICES REVENUE BUDGET 
4.1 The revenue budget for 2024/25 was approved by Moray Council on
28 February 2024 (para 7 of the minute refers). The service budget year to
date is as follows: 
Annual Budget Q1 Budget Q1 Actual Variance
£28,164k £7,109k £6,102 £917k underspend 
4.2 Environmental Protection 
Service
Area 
Annual
Budget
Q1 Budget Q1 Actual Variance
Waste
Management
£8,588k £948k £1,064k £116k
overspend
Open
Spaces
£1,758k £420k £395k £25k
underspend
Cleaning &
Catering
£7,731k £1,912k £1,867k £45k
underspend 
4.3 Waste Management is made up of the budgets for the waste collection
service, waste disposal service and public conveniences.  The net position for
quarter 1 is currently an overspend of £115,581 (12.19%).  This is primarily
due to an income shortfall (£106,000 - some of which is due to budget
profiling of the income), increased property costs following vandalism at two of
the public conveniences (£3,556 overspend) and additional vehicle hire costs
following vehicle breakdown. 
4.4 Open Spaces is made up of the budgets for the Burial Service, Lands and
Parks and Grounds Maintenance Other. The net position is that Open Spaces
budget is currently showing an underspend of £25,000 (5.98%) for the quarter
1 period.   
4.5 Within this, the burial service budget is currently showing a £53,000
overspend in quarter 1, primarily due to an income shortfall against the budget
profile.  It is anticipated that this will improve later in the year when the burial
service transitions into its busier periods in the autumn and winter. 
4.6 The Land and Parks budget is showing a £38,000 underspend, primarily due
to additional income from internal departments.  The Grounds Maintenance
other budget is currently showing an underspend of £40,000, though income
from the Dornell Wind Farm, in support of the core path ranger service, as
well £7k from event income being transferred to Trusts at year end, which will
affect the budget position as we progress through the year.   
4.7 Building Cleaning and Catering (TL395) is made up of the Catering and
Facilities Management.   The budget is showing a £44,707 (2.34%)
underspend for quarter 1. Underspends were achieved in food costs
(£36,000), primarily due to school trips, whilst at the same time income from
school meals was up £8000 against the budget prediction for the same
Page 50

Page 51

period.  Underspends on staff costs, due to vacancies, as well overspends on
transport costs and cleaning products all contributed towards the final quarter
1 budgetary position. 
4.8 Roads Maintenance & Fleet 
Service
Area 
Annual
Budget
Q1 Budget Q1 Actual Variance
Roads
Maintenance
£5,054k £2,566k £1,825k £741k
underspend
Fleet
Services
(£1,860k) (£484k) (£753k) £268k
underspend 
4.9 Expenditure within the roads maintenance revenue budget, which the bulk of
the budget is allocated to items such as carriageway repairs/footway
repairs/gully cleaning/grass cutting and ditching maintenance currently totals
£305,000 from an available budget of £2,000,000. The spend to date is mainly
attributed to reactive small carriageway patching repairs. The actual works
completed and works committed, (i.e. works identified and waiting to have
repairs scheduled and undertaken) currently totals £1,400,000. It is forecast
with high confidence that this budget will be fully spent at end of financial year. 
4.10 Whilst the overall budget position shows a net underspend, this is influenced
by the timing of internal recharging from the central fleet budget to service
budgets. The biggest underlying influence on variances is as a result of an
increase in vehicle repairs being undertaken by third parties (sub-contractor)
which has led to an increase in labour and overall replacement parts costs
which is then recharged to departments and is off-set in part by reduction on
direct employment costs. However, it is pleasing to report that the service has
recently been successful in recruiting a number of long-term vacant fleet
technician roles and this will allow more repair works to be undertaken in
house moving forwards throughout the year. 
4.11 Consultancy 
Service
Area 
Annual
Budget
Q1 Budget Q1 Actual Variance
Consultancy £1,003k £315k £323k £8k overspend 
4.12 The Flood Risk Management revenue expenditure to date is £70,713 and
includes flood scheme maintenance works, reactive maintenance and repairs
to the sea wall at Lossiemouth.  The bridges revenue spend to date is £1,650,
on surveys to inform future works. Other expenditure is budgeted salary
expenditure and similar. There are some variances which related to the timing
of expenditure versus budget phasing, however, the planned expenditure for
the year is on track and within budget. The remaining programme of bridges
revenue work is currently in the design phase and is programmed for delivery
in October and November.   
Page 51

Page 52

4.13 Transportation 
Service
Area 
Annual
Budget
Q1 Budget Q1 Actual Variance
Public
Transport
Unit
£6,124k £1,251k £1,249k £2k underspend
Traffic &
Transport
Development
£711k £218k £189k £30k
underspend
Marine
Services
(£154k) (£95k) (£60k) £34k overspend
Car Parks (£689k) (£214k) (£176k) £39k overspend 
4.14 There are no material variances in the public transport unit. For future reports
appendices will be presented showing trends for m.connect. 
4.15 Traffic & Transport Development are currently £30k under budget. 
4.16 Marine Service (Harbour and Dredger) are showing a £34k overspend year to
date. This relates to a £23k shortfall in income year to date at quarter 1 –
although this is early in the year it will be monitored. Cargo trends are in line
with previous years. There is a £9k overspend on employee costs and a £4k
overspend on fees and charges. For future reports appendices will be
prepared showing income trends for the harbours. 
4.17 Car Parks are reporting a £39k overspend. £17k relates to an essential
upgrade to the mobile network on the car park machines where telephony
suppliers have switched off the 3G network, requiring an upgrade of all the
SIM cards to 4G. There is a £23k shortfall in income against budget. For
future reports appendices will be prepared showing income trends and
analysis for the car parks. 
5. ENVIRONMENTAL & COMMERCIAL SERVICES CAPITAL BUDGET 
5.1 The capital budget for 2024/25 was approved by Moray Council on 24
January 2024 (para 11 of the minute refers). 
5.2 Environmental Protection 
Project Capital Budget 24/25 (gross, and
including requested carry
forwards)
Upgrade Recycling Centres £255,000
Domestic & Trade Waste Bins £115,000
Upgrade of containers at recycling
centres
£30,000
Gull Proof Bins £11,000
Dallachy £463,000
NESS £2,248,000
Cemetery Provision in Moray £64,000
Page 52

Page 53

Project Capital Budget 24/25 (gross, and
including requested carry
forwards)
Cemetery Provision in Elgin £2,746,000
Parks and Open Spaces
Infrastructure
£118,000
Children’s Play Areas (Parkland) £362,000 
5.3 Upgrade of recycling centres: A total of £12,265 has been spent or committed
in quarter 1.  The spend to date has been on procuring of skips to assist with
compliance issues at Household Waste and Recycling Centres for managing
Domestic Seating (WUDS) containing Persistent Organic Pollutants (POPs). 
Further spend will be incurred as the year progresses. 
5.4 Domestic & Trade Waste Bins: A total of £39,905 has been spent or
committed in quarter 1 on procuring bins for both household and commercial
premises.  Bins are provided either on the basis of the need for a replacement
(damaged or lost), provision for a new build property or for the uptake of
Council garden and trade waste service.   
5.5 Upgrade of containers at recycling centres: A total of £24,530 has been spent
or committed in quarter 1.  The spend to date has been on procuring of
replacement skips to at Household Waste and Recycling Centres.   
5.6 Gull Proof Bins: There has been no spend on this budget line in quarter 1. The
funds for this capital project are used to purchase gull proof litterbins.  The
litter bins will be installed in line with the approved roll out programme. 
5.7 Dallachy: There has been no spend against this budget in quarter 1.  The
main purpose of this budget is to facilitate the final capping exercise at
Dallachy landfill. Unfortunately, no compliant bids were received following the
tender exercise and so a further tender exercise will be required.  The options
available are currently being evaluated.   
5.8 Whilst the Energy from Waste plant is operational there remains some
elements of the project which still need to be completed and financial close
still needs to be determined. 
5.9 Cemetery Provision - There has been no spend on the cemetery projects in
quarter 1. Quotes are currently being sought for the works. The sites identified
for the maintenance works are shown below. Once quotes have been
received the works will be undertaken based on priority. 
Cemeteries Works being undertaken
Broomhill Cemetery Drainage and pothole repairs
Birnie Cemetery Wall repair
Buckie Cemetery Pothole repairs
Buckie New Cemetery Land drainage works
Duffus Cemetery Drainage
Kinloss Abbey Repairs to boundary fence and
vegetation management
Lossiemouth Cemetery Repairs to entrance surface
Page 53

Page 54

5.10 Elgin Cemetery (new) £3,000 has been spent so far in 2024/25 on solicitor
and surveyor fees. 
5.11 Parks and Open Space Infrastructure – the capital allocation is used to ensure
any emerging infrastructure issues, which present a health and safety
concern, can be addressed.  The funds are used to undertake both planned
and emergency works. £5,000 has been spent in quarter one with works
planned for quarter 2 onwards. 
Parks and Open Space Works being undertaken
Across relevant sites Repairs to kickabout play goals
Cooper Park, Elgin Pond edging/coping repairs
Cooper Park, Elgin  Road drainage
Cuthill Park, Keith Surfacing repairs at car park
Linzee Gordon Park, Buckie Surfacing works at entrance
Lossiemouth Playing Field, Elgin Repairs to path/step to play area 
5.12 Play Areas: The Council currently receives funding from Scottish Government
through the Renewal of Play Parks fund for the improvement/refurbishment to
its play areas.  The play areas selected for upgrading/refurbishment for
2024/25 are shown below. A total of £9,000 has been spent in quarter one
with works planned for quarter 2 onwards. 
Play Area Works being undertaken
Letterfourie, Buckie Upgrading play equipment for ages
0 -12. (Project carried forward from
2023/24)
Miscellaneous repairs, including
surfacing
As prioritised from the independent
annual inspection and routine
monthly inspections
Hopeman Playing Field, Hopeman Play equipment renewal – subject to
participatory budgeting 
Randolph Lane, Forres Play equipment renewal – subject to
participatory budgeting
Tomnavoulin, Speyside Upgrading play equipment for ages
2 -5. (Project carried forward from
2023/24) 
5.13 Facilities Management: The facilities management section covers the
Janitorial, Building Cleaning, Caretaker and facilities functions at HQ/Annexe. 
The section has a capital allocation of £15,000 per year.  These funds are
used to purchase tools and equipment for the services, such as cleaning
equipment.  The funds are used on an emerging basis rather than a cyclical
and planned replacement programme. There has been no spend so far in
2024/25.    
5.14 Roads Maintenance & Fleet 
5.15 The roads capital budgets in the main include the surface dressing
works/resurfacing schemes/drainage improvements and street lighting column
replacements which are over design life. The current spend is reported at
Page 54

Page 55

£226,000. However, the actual works completed and works committed
currently totals £3,800,000 from available budget of £4,200,000. It is forecast
with high confidence that this budget will be fully spent at end of financial year.
The priority during the summer months is to complete the annual surface
dressing programme. It can be reported that this year has been a challenging
programme to complete due to a number of factors. As a result of several
bursts of more wintry weather throughout the late winter/early spring resulted
in a delay to the pre patching of roads (repairing potholes and depressions)
prior to the surface dressing overlay. This led to the start of programme being
delayed by 3 weeks. In addition, there have been 6 full rained off days plus
many late starts or early finishes due to wet/damp weather experienced. The
team have also encountered some unplanned plant breakdowns which has
resulted in delays to on site operations. It is reported that despite all of the
above, the team completed 81% of the planned surface dressing programme.
The remaining schemes will be carried forward to future year’s programme. 
5.16 The current capital spend used to fund the Councils vehicle replacement
programme is reported at £340,000 which is attributed to actual vehicles being
purchased and delivered. The committed budget at the end of quarter 1 is
£2,700,000 which means that vehicles have been ordered and are awaiting
delivery. The committed capital spend forecast by the end of quarter 2 is
currently £3,927,000. It is forecast with high confidence that this budget will be
fully spent at end of financial year but is very much subject to vehicles being
supplied by manufacturers. 
5.17 Consultancy 
5.18 In Quarter 1 sediment management works at Landshut Bridge relief channel,
Longmorn and Chapelton Dam were completed at a cost of £170,000, which
was carried forward from 2023/24.  Preparation of the Coastal Adaptation
work for 2024/25 is being progressed. Work at Viewmill Bridge started in
Quarter 1, with expenditure of £25,000 and is programmed for completion in
August.  The contract for maintenance work to Auchriachan Bridge was
awarded in July. Work will commence on site in August and is programmed
for completion in mid October. 
5.19 Transportation 
5.20 Harbour Infrastructure works have been tendered for Burghead, Cullen and
Findochty and are planned for delivery in quarter 3. 
5.21 Active Travel schemes funded by Cycling, Walking and Safer Routes funding
have been planned, along with procurement of Signs & Road markings. 
6. ECONOMIC GROWTH & DEVELOPMENT 
6.1 Business Gateway – The full Business Gateway Budget of £32k is required
annually to provide specialist services and workshops (already procured for
24/25). 
Page 55

Page 56

6.2 Moray Gift Card (initiative started by Scotland Loves Local) – administration of
the scheme continues into 2024-2025 using external funds that can only be
spent as intended.  The funds must be carried forward until spent in full. 
6.3 Maintenance of projects – Full £9k budget for 24/25 is fully committed to
activity in relation to Forres Town Centre Improvement. 
6.4 Growth Deal – £30k is available for specialist services related to the
development of the Moray Growth Deal. A contract has been awarded to
BiGGAR Economics to assist in the gathering of data for the Deal’s Benefit
Realisation and Monitoring Plan. This work is in progress and expected to
conclude late Q2. In parallel, a DAR was approved to temporarily increase the
number of hours worked by the 0.5 FTE Programme Officer. This was to
accommodate a peak in activity up to end of July 2024 and has a value of
£6,130. 
7. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Effective budget management is an essential component of delivery of
Council priorities on a sustainable basis. 
The capital plan is one of the vehicles through which the Council’s
priorities can be delivered. The approved capital plan for 2024/25 and
the outline ten year plan incorporates measures designed to address the
LOIP priorities of building a better future for our children and young
people, empowering and connecting communities and developing a
diverse, inclusive and sustainable economy. 
(b) Policy and Legal
There are no policy or legal implications arising directly from this report. 
(c) Financial implications
The financial implications are highlighted within the report. 
(d) Risk Implications
Budget managers are aware of their responsibilities for managing budget
allocations and approval for variance will be sought from Committee in
line with the Financial Regulations. 
(e) Staffing Implications
There are no staffing implications arising from this report. 
(f) Property
There are no Property implications arising from this report. 
(g) Equalities/Socio Economic Impact
There are no equalities implications arising from this report because the
report informs the Committee on budget monitoring.  
Page 56

Page 57

(h) Climate Change and Biodiversity Impacts
There are no climate change or Biodiversity impacts arising from this
report. Achieving net zero will have significant implications for future
planned capital expenditure. 
(i) Consultations
This report has been prepared in consultation with Depute Chief
Executive (Economy, Environment & Finance), Head of Environmental
and Commercial Services, Acting Head of Economic Growth and
Development Services, Chief Financial Officer, Legal Services Manager,
Committee Services Officer (L Rowan) and Environmental and
Commercial Services Management Team and Budget Managers.  Any
comments have been taken into consideration. 
8. CONCLUSION 
8.1 This report sets out the budget monitoring position and comments on 
variances for the Environmental and Commercial Services and 
Economic Growth and Development Services (Economic Development) 
Capital and Revenue Budgets for the period to 30 June 2024. 
Author of Report: Nicola Moss, Head of Environmental and Commercial
Services 
Beverly Smith, Acting Head of Economic Growth &
Development 
Background Papers: 
Ref: SPMAN-524642768-1133 
Page 57

Page 58

Page 58

Page 59

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 3 SEPTEMBER 2024 
SUBJECT: INFORMATION REPORT: NATURE RESTORATION FUND 2023-
24 UPDATE 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the Scottish Government’s Nature Restoration
Fund grant of £246,000 in 2023-24 and delivery of projects therein. 
1.2 This report is submitted to Committee in terms of Section III (F) (13) of the
Council's Scheme of Administration relating to matters regarding
environmental protection. 
2. BACKGROUND 
2.1 The Scottish Government’s Nature Restoration Fund was introduced in 2021
in response to the biodiversity crisis.  The council declared a nature
emergency in 2023, recognising the urgent need to aid nature recovery and
restoration.  The purpose of the fund is to support actions that help nature
recover by enhancing biodiversity and local ecosystems and/or using nature
based solutions to mitigate and adapt to the climate emergency and its
impacts.   
2.2 The fund is intended to run for five years until 2025/26, with direct capital
grants provided to Scottish Local Authorities.  Moray Council received
£101,000 in 2021/22 and £124,000 in 2022/23.  Project allocation for both
these years was agreed by committee on 16 November 2021 and 6
September 2022 respectively (paras 15 and 13 of the minutes refer). 
2.3 The grant has been widely welcomed and has delivered many positive
outcomes for both people and nature.  These have previously been outlined
within a report to this committee on 2 May 2023 (para 20 of the minute refers)
and within the Biodiversity Duty Report also reported to this committee on 14
November 2023 (para 8 of the minute refers). 
Page 59

Page 60

2.4 In recognition of challenges to maximising the full benefit of the grant,
including short timescales for delivery and limited staff capacity, the Head of
Economic Growth and Development was granted authority at this committee
on 15 November 2022 to make future project allocation decisions, subject to
annual reporting (para 9 of the minute refers). 
2.5 On 26 June 2023 the council was allocated £246,000 from the fund, with a
requirement that minimum 50% should contribute to the development of a
local Nature Network.  All Scottish Local Authorities are required to include a
nature network within local development plans, with the aim of supporting
ecological connectivity on a landscape scale to help reverse biodiversity loss
by 2045.  The networks, which are similar to wildlife corridors, will link legally
protected sites like SSSIs, as well as creating/improving links within and to
urban areas.  More information on the Moray Nature Network can be found on
the story map linked from the council’s biodiversity web pages (link at end of
this report). 
2.6 The funding was allocated as part of the general capital grant, and a carry
forward of £149,000 was approved by the council on 26 June 2024 (para 13 of
the minute refers).  The projects outlined in para 4.1 are therefore being
delivered across 2023/24 and 2024/25.   
3. DELIVERY OF 2023/24 GRANT 
3.1 Following consultation with Open Spaces colleagues and Head of Economic
Growth & Development approval, the below project areas were agreed.  It
should be noted that most of these actions also contribute to the Nature
Network, particularly those in, or adjacent to, urban areas.  Further details on
some of this work can be found within the Biodiversity Duty Report 2021-23,
which is now published on the council’s website. 
Wildflower and Living Lawn sites £79,500
The funding supported maintenance and enhancement of the existing sites at
Aberlour, Buckie, Craigellachie, Dyke, Elgin, Forres, Garmouth, Kingston,
Lossiemouth, Rafford and Rothes.  New planting areas were introduced at
Millbuies and Mannachie Park, and delivery of the Mannachie Park
masterplan was further supported through the introduction of new hedging,
trees and bulbs. 
Condition surveys of existing sites were undertaken, with management
recommendations produced to help guide appropriate mowing patterns and
reseeding.  
The success of the project was promoted (at no cost) at the North East
Biodiversity Partnership seminar, the theme of which was ‘action for
pollinators’. 
Carried forward funding will continue to support Open Spaces to maintain and
enhance the wildflower and living lawn program, as well as progress the
Mannachie Park masterplan with additional tree planting. 
Nature Sites £91,500
Page 60

Page 61

At the Wards wildlife site, a new wildflower area was created using locally
sourced plug plants.  A decision on the creation of a new pond to the north
east of the site has been deferred to prioritise management and monitoring of
existing enhancements and consider the potential impact of the planned
Bilbohall development. 10 swift nest boxes have been installed on Cedarwood
Day Centre, adjacent to the Wards and are being monitored.  A further 15
nest boxes will be installed on nearby schools and known swift colony
hotspots.   
At Millbuies woodland and loch, 9750 native trees (Scots pine, oak, birch,
rowan and hawthorn) have been replanted in the area south of the loch.  The
felled trees were commercial non-native conifers planted in a manner
unsuitable for conversion to Low Impact Silvicultural Systems, which is the
long term vision for Millbuies.  Continued management of rhododendron, and
understory planting at the main walk entrance are ongoing.     
Small invasive non native trees were removed from throughout the SSSI area
of Elgin Oakwood on advice and with consent from NatureScot.  The ancient
oak woodland ecosystem has been listed by NatureScot as in ‘unfavourable
condition’, and as a protected site is therefore a key opportunity for the council
to deliver the Nature Network on its land.  A woodland management plan has
been submitted to Scottish Forestry to enable selective felling to take place in
order to protect and restore the ecological functioning of the woodland.
Redundant tree protectors are being removed from across the woodland. 
Greenfingers therapeutic horticulture project collected acorns from within the
woodland to grow on in their Cooper Park nursery for replanting in future.
Greenfingers also participated in several educational sessions about Elgin
Oakwood and the value of local provenance trees and wildflowers. 
Wild Things Environmental Education in Action have been contracted to
undertake a range of conservation activities across Millbuies, Elgin Oakwood
and the Wards wildlife site.  This project is providing opportunities for schools
and communities to be involved in caring for these sites, adding social, health
and wellbeing benefits alongside the planned biodiversity enhancements. 
Scottish Invasive Species Initiative £15,000
A contribution was made to the landscape scale, strategic work that the
project carries out on watercourses throughout Moray.  The invasive non-
native species they primarily target are Japanese knotweed and giant
hogweed, working from the source of infestations and engaging with
landowners and communities to ensure long term success. Infestations that
have been targeted include the Lossie from Kellas to Elgin and on the Spey
between Fochabers and Spey Bay, Kinloss Burn and Findhorn Bay area
alongside continued action and engagement with landowners in the upper
catchments.   
Nature Network £40,000
Detailed opportunity mapping of potential nature networks to connect
protected sites and urban-rural wildlife corridors is currently being completed.
Key stakeholders have been consulted on the draft map to identify
Page 61

Page 62

opportunities and constraints and the output will be incorporated into the
forthcoming biodiversity strategy and the next local development plan.   
The completion of the nature network mapping and consultation will identify
areas where action can be taken and further ecological survey work is
required.  Following the development of the nature network, the ecologist will
also provide expert advice on the forthcoming biodiversity strategy. 
Community projects £20,000
Small grants for individuals and community groups are being distributed by
tsiMORAY / Moray CAN in September as part of an existing grant scheme. 
4. BIODIVERSITY STRATEGY AND NATURE NETWORK UPDATE 
4.1 National Planning Framework 4 (NPF4) requires Local Development Plans
(LDPs) to facilitate the creation of nature networks.  Guidance for local
authorities was published in August 2023, alongside the additional Nature
Restoration Fund allocation for this purpose received in July 2023.  To ensure
a nature network is part of the LDP 2027, work in this area has been
accelerated in the last year.  As a result, Moray’s Nature Network opportunity
map is among the first in Scotland and our approach has received strong
support from NatureScot. 
4.2 This committee agreed on 2 May 2023 that a biodiversity strategy for Moray
be reported in 2024 (para 20 of the minute refers).  The extensive work
undertaken for the LDP evidence report (Special Meeting of the Moray
Council on 24 April 2024, para 17 of the minute refers) and Moray Nature
Network are providing the opportunity for a stronger strategy to be developed. 
However, this work has impacted on staff capacity to prepare the planned
strategy in recent months, and there is a desire that the strategy align with
both the nature network and the forthcoming Climate Change Strategy
update.  A biodiversity strategy is therefore currently in development, but will
be reported in 2025 to allow engagement to coincide with the Climate Change
Strategy update. 
4.3 The Scottish Government recently allocated £122,000 to the council as a
direct capital grant for 2024/25.  On this basis, the Head of Economic Growth
and Development has approved several project areas that deliver the grant
criteria and will support the Moray Nature Network. These include; 
• Continued contribution to the Scottish Invasive Species Initiative
projects within Moray. 
• A potential new pilot project involving school grounds and outdoor
learning that will deliver multiple workstreams such as nature
restoration, natural capital and climate adaptation alongside climate
education.
• Progressing seasonal nature restoration or enhancement projects on
council land ahead of the anticipated 2025/26 grant allocation. 
4.4 £112,000 of this has been requested to carry forward into 2025/26 in a
separate report to Corporate Committee on 26 August 2024.  Should there be
Page 62

Page 63

further direct funding for nature network delivery, this could expand the
planned work on council land and be distributed as grants for woodland and
agriculture biodiversity enhancements within the identified opportunity areas. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Nature conservation and action to reverse biodiversity loss supports the
delivery of corporate plan priorities by; improving health and wellbeing,
strengthening communities and supporting greater attachment to place,
minimising harm and costs arising from climate change impacts and
creating economic opportunities. 
(b) Policy and Legal
The Nature Conservation (Scotland) Act 2004 places a duty on public
bodies in Scotland to further the conservation of biodiversity when
carrying out their duties.  The Council’s Climate Change Strategy aims to
‘Work to retain, protect and enhance biodiversity across Moray’ and
NPF4 requires that the council produce and support the delivery of a
Nature Network. 
Some policies and legislation relating to nature restoration that are
particularly relevant to this report include; 
• Nature Conservation (Scotland) Act 2004
• Wildlife and Natural Environment (Scotland) Act 2011
• Scottish Biodiversity Strategy to 2045
• National Planning Framework 4
• Pollinator Strategy for Scotland
• Climate Change (Scotland) Act 2009 and 2019
• Moray Climate Change Strategy
• Moray Woodland and Forestry Strategy
• Scotland’s Draft National Adaptation Plan 3
• Curriculum for Excellence through Outdoor Learning
• Scotland's National Strategy for Economic Transformation 
(c) Financial implications
There are no additional costs arising from this report.  The Nature
Restoration Fund has so far provided £470,000 capital funding to
support the council’s response to the climate and nature crisis and
delivery of associated national policy developments, bringing benefits to
people and nature that would otherwise not have been possible within
existing council budgets. 
(d) Risk Implications
There is a risk that staff resources are not sufficient to deliver the full
grant so future projects need to take account of staff capacity to ensure
these are realistic and achievable and make use of partnership
opportunities where possible. 
Page 63

Page 64

Ongoing maintenance implications for all projects are carefully
considered to reduce the risk to Open Spaces should external funding
not be available in future.   
There is also a reputational risk should the council not take meaningful
action following its declaration of a Nature Emergency. 
(e) Staffing Implications
Delivery of the grant will continue to place pressure on officers from
Strategic Planning and Development who manage the received grant
funding and lead on several of the projects within available capacity and
workloads, working with officers from Environmental Protection and other
departments and agencies where relevant and on a prioritised basis. 
(f) Property
Nature restoration activities are considered to enhance land owned
and/or managed by the Council, and within the Moray area. 
(g) Equalities/Socio Economic Impact
By increasing biodiversity, projects should also contribute to community
health and wellbeing and reduce inequalities of access to nature. 
(h) Climate Change and Biodiversity Impacts
All Nature Restoration Fund projects chiefly and directly support
mitigation of, and adaptation to, the climate and nature crisis. 
(i) Consultations 
The Depute Chief Executive (Economy, Environment and Finance), the
Head of Economic Growth and Development, the Legal Services
Manager, the Open Space Manager, the Environmental Protection
Manager, the Chief Financial Officer, Lissa Rowan(Committee Services
Officer) and Equal Opportunities Officer have been consulted and
comments received have been incorporated into the report. 
6. CONCLUSION 
6.1 The Scottish Government’s Nature Restoration Fund has made available
£246,000 in 2023/24 to help nature recover in Moray. 
6.2 People and nature continue to benefit from projects delivered through
this grant. These include wildflower and native woodland planting,
restoration of protected sites, removal of harmful invasive species and
connecting communities with their local environment. 
Author of Report: Sophie Ward, Climate Change Strategy Officer 
Background Papers: 
Page 64

Page 65

• Nature Restoration Fund  - report to ED&I 16 November 2021 LINK 
• Nature Restoration Fund  - report to ED&I 6 September 2022 LINK 
• Nature Restoration Fund Long Term Plan - report to ED&I 15 November 2022
LINK 
• Nature and Biodiversity Position Statement - report to ED&I 2 May 2023 LINK
• Biodiversity Duty Report – report to ED&I 14 November 2023 LINK 
Ref:    SPMAN-813460984-612 
• Moray Council nature and biodiversity pages (including Biodiversity Duty
Reports and Millbuies summary plan): LINK 
• Moray Nature Network story map LINK 
• Nature Networks guidance from NatureScot LINK   
Page 65

Page 66

Page 66

Page 67

REPORT TO:   ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 3 SEPTEMBER 2024 
SUBJECT: INFORMATION REPORT: HIGHLAND AND MORAY LOCAL
SPACE CLUSTER 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform committee of the current updates on the North Highland and Moray
Space Cluster. 
1.2 This report is submitted to Committee in terms of Section III (F) (2) of the
Council's Scheme of Administration relating to the exercise of functions that
promote economic development. 
2. BACKGROUND 
2.1 The UK Space sector is a fast growing sector which generated an estimated
income of £18.9 billion in 20/21 and supports 52,000 jobs across the UK of
which 12% are based in Scotland. 
2.2 The Scottish space sector is a booming sector that is aiming to grow in value
to £4 billion by 2030.  As highlighted by the table below, in 21/22 Scotland was
home to 228 Space businesses that generate an income of £298m.  The
sector employs 6404 people amounting to 12% of the total UK industry. 
21/22 % of UK total
UK space organisation
population by region
228 8%
Page 67

Page 68

UK space industry income 298 2%
UK space industry employment  6,404 12% 
2.3 The UK Space Agency has opened an office in Edinburgh to strengthen its
presence in Scotland.  This move is part of a broader strategy to support the
Scottish space sector with significant funding.  Investments include £30 million
for operations at SaxaVord Spaceport and additional funds for the
development of Sutherland Spaceport.1 
2.4 The Scottish Affairs Committee has launched an inquiry to assess the space
sector's economic contributions, opportunities, challenges, and international
competitiveness.  This inquiry aims to gather evidence and ensure that
government strategies align with the sector's needs. 
2.5 The North Highland and Moray Space Cluster is focused on capitalising on
economic opportunities that will be generated by satellite launches from
Space Hub Sutherland and to attract a space business cluster to the North
Highlands and Moray. 
2.6 HIE has been instrumental in supporting space sector developments in Moray
and Highland.  They have provided funding and support for various projects,
including the Sutherland Spaceport and other space-related activities, which
aim to leverage the region's unique geographical advantages for space
launches. 
3. NORTH HIGHLAND AND MORAY SPACE CLUSTER UPDATES 
3.1 Orbex, operating out of Enterprise Park Forres, now has 2 active patents in a
number of European countries and the United States covering various parts of
its rocket technology.  It is powered by a renewable bio-fuel, which allows the
rocket to reduce carbon emissions significantly compared to other similarly
sized rockets being developed elsewhere around the world.  The Sutherland
Spaceport, currently under construction, will support these environmentally
friendly launch activities. 
3.2 Construction at Sutherland Spaceport is progressing rapidly.  Recent key
achievements include the installation of the first watercourse crossing bridge
and the advancement of the floating road, which protects the peat bog
ecosystem 
3.3 The space sector offers significant opportunity for growth and high quality jobs
in Moray. The presence of Orbex reinforces this.  Orbex has received £16.7m
follow on investment which will be largely spent on generating jobs in Moray. 
This investment and job creation will ramp up the development of Prime, its
19-metre long, two-stage rocket designed to transport small satellites into Low 
1 https://news.stv.tv/east-central/uk-space-agency-opens-inaugural-scottish-office-at-queen-elizabeth-house-in-
edinburgh 
Page 68

Page 69

Earth Orbit.  The aim is to ensure full readiness and scalability for its launch
period . 
3.4 The Cluster made a successful bid to the UK Space Agency’s “International
Bilateral Fund” to forge new links between Moray and the USA.  The UK
Space Agency’s International Bilateral Fund is focused on supporting the UK
space sector to work directly with international partners on exciting and
innovative projects. 
3.5 The Cluster has recently attended the UK Space conference in November
2023 and Farnborough International Airshow in July 2024 to promote
opportunities in Caithness, Sutherland and Moray.  Both have been a huge
success and the  participation underscored the Region's growing prominence
in the space sector. 
3.6 New projects are under development with UHI in relation to STEM
engagement.  These are being led by the Cluster STEM Leadwho attended
the National Space Academy last month to make new partnerships and
generate impactful ideas for local STEM projects. 
With the resignation of Councillor Leadbitter as the council representative on the Space
Cluster Group, a new council representative will be required and this along with other
changes will be the subject of a report to council after the November by-election. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) 
The development of the local space cluster supports the corporate plan
priority of promoting economic development and growth, as well as the
LOIP priority of a growing and sustainable economy.   
(b) Policy and Legal 
None. 
(c) Financial implications 
There is no direct financial implications arising from this report. 
(d) Risk Implications 
None. 
(e) Staffing Implications 
None. 
(f) Property
Page 69

Page 70

None. 
(g) Equalities/Socio Economic Impact 
There are none because the recommended actions do not affect
people. 
(h) Consultations 
Consultation has taken place with the Depute Chief Executive
(Economy, Environment and Finance), the Acting Head of Economic
Growth and Development, the Legal Services Manager, the Equal
Opportunities Officer, and Lissa Rowan (Committee Services Officer)
have been consulted and comments received have been incorporated
into the report. 
5. CONCLUSION 
5.1 The space sector in Moray and the Highlands is undergoing
transformative growth, driven by local innovative companies like Orbex
and supported by strategic investments in infrastructure like the
Sutherland Spaceport.  These developments not only enhance Moray’s
position in the global space industry but also promise significant
economic and employment benefits for the region. 
Author of Report: Shannon Creswell, Business Gateway Adviser 
Background Papers:   
Ref: SPMAN-813460984-613       
Page 70

Page 71

REPORT TO: ECONOMIC DEVELOPMENT AND INFRASTRUCTURE
SERVICES COMMITTEE ON 3 SEPTEMBER 2024 
SUBJECT: INFORMATION REPORT:  LIST OF PROPERTY
TRANSACTIONS CONCLUDED UNDER DELEGATED
POWERS 
BY: DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT &
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of property transactions which have been dealt with
under delegated powers. 
1.2 This report is submitted to the Economic Development and Infrastructure
Services Committee in terms of Section III F (5) of the Council's Scheme of
Administration relating to industrial and commercial development. 
2. BACKGROUND 
2.1 In terms of the Council’s Scheme of Delegation, the Head of Housing and
Property has delegated authority to grant leases, licenses or other occupation
agreements of land and buildings for 25 years or less duration where the
initial rent does not exceed £35,000 per annum and sites on long term
building leases of up to 125 years duration where the initial rent does not
exceed £35,000 per annum. 
2.2 In terms of the Council’s Scheme of Delegation, the Head of Housing and
Property has delegated authority to conduct rent reviews and fix new rents. 
2.3 In terms of the Council’s Scheme of Delegation, the Head of Housing and
Property has delegated authority to grant wayleaves or servitudes over
Council owned property. 
2.4 In terms of the Council’s Scheme of Delegation, the Head of Housing and
Property has delegated authority to accept the highest offer received for
surplus heritable property provided that the highest offer received is for a sum
no less than the price at which the property has been offered for sale on the
open market. 
2.5 In terms of the Council’s Scheme of Delegation, the Head of Housing and
Property has delegated authority to approve acquisitions of heritable property
up to a value of £250,000 where appropriate provisions have been made in
Page 71

Page 72

the Capital or Revenue Plan.  For acquisitions by lease, this delegation covers
property with a rental value of up to £5,000 per annum where appropriate
provision has been made in the Capital or Revenue Plan. 
3. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The proposals support the aim of delivering financial stability. 
(b) Policy and Legal
None. 
(c) Financial Implications
The transactions detailed in APPENDICES I, II, III and IV will generate
monies to the Council. 
Funds for the acquisition of the property detailed in APPENDIX V were
made from existing provision in the Housing Revenue Account. 
(d) Risk Implications
None. 
(e) Staffing Implications
None. 
(f) Property
None. 
(g) Equalities/Socio Economic Impact
None. 
(h) Climate Change and Biodiversity Impacts  
None. 
(i) Consultations
None. 
4. CONCLUSION 
4.1 It is recommended that the Committee notes the 12 leases, 17 rent
reviews, 1 wayleave, 1 property disposal and 1 acquisition of property
as set out in APPENDICES I, II, III, IV and V. 
Author of Report: Stuart Beveridge, Asset Manager (Commercial Buildings)
Background Papers: 
Ref:   SPMAN-1285234812-1613
Page 72

Page 73

APPENDIX I 
REPORT TO THE ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES COMMITTEE ON 3 SEPTEMBER 2024 
LIST OF LEASES OF BUILDINGS AND SITES – SUBMITTED FOR NOTING 
1. Reference No. 
2. Officer’s Ints
1. Address 
2. Tenant
1. Building (m²) 
2. Site (Ha) 
1. Date of Entry 
2. Review Period
Rent
(per annum)
Remarks
1. EL/1/136 
2. ALBU
1. 3 Chanonry Road North,
Elgin 
2. Northscaff Ltd
SC564107
1. - 
2. 0.231Ha
1. 28/2/24 
2. 5 years
£8,550 Permitted Use: 
Builder’s/Scaffolder’s yard
development.
1. EL/1/207 
2. IAWA
1. 9 Chanonry Spur, Elgin 
2. Tony Weir Contractor Ltd
1. 86.25sqm 
2. 0.13Ha
1. 23/5/24 
2. 3 years
£15,000 Permitted Use:  Workshop
with ancillary offices & yard
in connection with tenants
fencing contractors
business.
1. EL/1 
2. CQ
1. Woodside Terrace, Elgin 
2. Contractors Site
Compound
1. 90sqm 
2. 0.009Ha
1. 2/6/24 – 24/11/24 
2. -
£0 Permitted Use: 
Contractors site compound
licence in relation to
Council Housing in Elgin
area (non-chargeable
permission). 
Page 73

Page 74

1. CL/1 
2. CQ
1. Cullen Links, Cullen 
2. Mrs R Gorrara, Sauna at
the Kings
1. 
2. 
1. 
2. 
£650 Permitted Use:  Mobile
vendor permission to site
on and trade from Council
ground.  Vendor holds
valid Street Traders
Licence.
1. ME/482/7 
2. STBE
1. Rothiemay & District
Playgroup, Rothiemay
Primary School,
Rothiemay 
2. Rothiemay & District
Playgroup
1. 212sqm 
2. -
1. 1/7/24 
2. 1/7/27
£400 Permitted Use:  Children’s
outdoor play.
1. BK/750/85 
2. SOAND
1. 36 Commercial Road,
Buckie 
2. Farra Marine ROI Ltd
1. 294.09sqm 
2. 0.045Ha
1. 1/2/23 
2. 3 years
£10,000 rising
to £12,000 in
Year 2
Permitted Use:  General
storage & ancillary office.
1. LO/1/204 
2. SOAND
1. Unit 4 Coulardbank
Industrial Estate,
Lossiemouth 
2. Rodgers Electrical
Services Ltd
1. 70.05sqm 
2. 0.0248Ha
1. 13/6/24 
2. 3 years
£7,250 Permitted Use:  Electrical
sub-contractor storage. 
Page 74

Page 75

1. FR/4/209 
2. IAWA
1. 10 Waterford Circle,
Forres 
2. Kay Perry, T/A The
Moray Cleaner
1. 70sqm 
2. 0.02Ha
1. 20/6/24 
2. 3 years
£7,650 Permitted Use:  Workshop
& store in association with
tenant’s cleaning business.
1. KE/3/258 
2. ALBU
1. Unit N & M Isla Bank
Mills, Keith 
2. Oakwood Cooperage Ltd
(SC596065)
1. 342.7sqm 
2. 3.29Ha
1. 1/9/24 
2. 3 years
£22,000 Permitted Use:  Metal
fabricators workshops &
store. 
1. EL/645/38 
2. STBE
1. 2 High Street, Elgin 
2. Osprey Housing Ltd
1. - 
2. -
1. 1/8/24 
2. Annually
£3,022 Permitted Use  Licence to
use one desk. 
1. EL/5/262 
2. ALBU
1. 4 Pinefield Parade, Elgin 
2. Keith Paterson
1. - 
2. 0.11Ha
1. 1/10/24 
2. 5 yearly
£5,195 Permitted Use:  
Develop workshops, store
& yard.
1. BD/750/1 
2. ALBU
1. Site 2 Burghead
Harbour, Burghead 
2. John Stewart
1. 79.5sqm 
2. 0.016Ha
1. 1/9/24 
2. 3 years
£2,400 Permitted Use:  Paint store
with office. 
Page 75

Page 76

Page 76

Page 77

APPENDIX II
REPORT TO THE ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES COMMITTEE ON 3 SEPTEMBER 2024 
LIST OF RENT REVIEWS OF BUILDINGS AND SITES - SUBMITTED FOR NOTING 
1. Ref No.
2. Valuer’s Ints.
1. Address
2. Tenant
1. Building (m²) 
2. Site (Ha)
1. Date of Entry
2. Review Period
Interval
1. Previous Rent
2. New Rent
Remarks
1. BK/1/107 
2. IAWA
1. 5 March Lane, Buckie 
2. Grant Refrigeration
1. - 
2. 0.07Ha
1. 1/6/89 
2. 5 years
1. £1,525 p.a. 
2. £1,830 p.a.
Permitted Use:
Repair & refurbishment
of refrigeration units.
1. EL/3/206 
2. STBE
1. 6 Linkwood Lane, Elgin 
2. Scott Abernethy
1. 130sqm 
2. 0.08Ha
1. 1/11/94 
2. 3 years
1. £10,600 p.a. 
2. £12,400 p.a.
Permitted Use:
Use Classes 4, 5 & 11
of the Use Classes
(Scotland) Order 1989
& for the sale, repair,
maintenance of motor
cars & spare parts.
1. KE/410/2 
2. STBE
1. Nursery in Community Centre,
Banff Road, Keith 
2. Keith Play Centre Ltd
1. - 
2. -
1. 2/8/21 
2. Stepped
annually
1. £3,200 p.a. 
2. £4,800 p.a.
Permitted Use:
Childcare nursery.
1. BK/482/5 
2. STBE
1. Portessie Primary School
Nursery, Buckie 
2. Portessie Playgroup
1. 68sqm 
2. -
1. 2/8/21 
2. Stepped
annually
1. £1,262 p.a. 
2. £1,893 p.a.
Permitted Use:
Childcare nursery.
Page 77

Page 78

1. MW/482/8 
2. STBE
1. Knockando Playgroup,
Knockando Primary School,
Aberlour 
2. Knockando Playgroup
1. 49sqm 
2. -
1. 2/8/21 
2. Stepped
annually
1. £816 p.a. 
2. £1,224 p.a.
Permitted Use:
Childcare nursery.
1. KE/482/5 
2. STBE
1. Strathisla Childrens Centre,
Keith 
2. Flexible Childcare Services
Scotland SCIO
1. 460sqm 
2. 0.57Ha
1. 2/2/22 
2. Stepped
annually
1. £10,660 p.a. 
2. £15,990 p.a.
Permitted Use:
Childcare nursery.
1. PK/482/2 
2. STBE
1. Portknockie Primary School
Nursery, Portknockie 
2. Portknockie Playgroup
1. 74.3sqm 
2. 0.086Ha
1. 2/8/21 
2. Stepped
annually
1. £1,940 p.a. 
2. £2,910 p.a.
Permitted Use:
Childcare nursery.
1. ME/482/7 
2. STBE
1. Rothiemay & District Playgroup,
Rothiemay Primary School,
Rothiemay 
2. Rothiemay & District Playgroup
1. 44sqm 
2. -
1. 2/8/21 
2. None
1. £516 p.a. 
2. £774 p.a.
Permitted Use:
Childcare nursery.
1. KE/1/204 
2. ALBU
1. 5 Western Road South, Keith 
2. Sippdeal Trustees Ltd
1. - 
2. 0.21Ha
1. 12/5/09 
2. 5 years
1. £5,190 p.a. 
2. £7,025 p.a.
Permitted Use:
Distribution warehouse
in relation to laundry
service.
Page 78

Page 79

1. EL/8/224 
2. STBE
1. Unit 24 Tyock Industrial Estate,
Elgin 
2. Dingbro Ltd
1. 546.5sqm 
2. 0.07Ha
1. 1/7/12 
2. 3 years
1. £40,000 p.a. 
2. £47,500 p.a.
Permitted Use:
Warehouse & office
accommodation in
connection with
tenant’s business as
wholesale motor
factor.
1. KE/3/269 
2. ALBU
1. Unit Q1 Isla Bank Mills, Keith 
2. Advanced Electrics Ltd
1. 315sqm 
2. 0.03Ha
1. 1/3/15 
2. 3 years
1. £9,625 p.a. 
2. £11,810 p.a.
Permitted Use:
Workshops, stores &
offices for electrical
contractors.
1. BK/750/91 
2. ALBU
1. Pier 3 Buckie Harbour,
Commercial Road, Buckie 
2. Ocean Winds UK Ltd
(07101190)
1. - 
2. 0.27Ha
1. 21/9/23 
2. Annually
1. £10,000 p.a. 
2. £10,240 p.a.
Permitted Use:
Windfarm
maintenance.
1. KE/3/260 
2. ALBU
1. Unit P Isla Bank Mills, Keith 
2. Oakwood Cooperage Ltd
(SC596065)
1. 696sqm 
2. 0.18Ha
1. 3/1/21 
2. 3 years
1. £21,550 p.a. 
2. £26,000 p.a.
Permitted Use:
Workshops & storage
in relation to
cooperage & barrel
storage.
1. FR/1/208 
2. IAWA
1. Unit 11 Greshop Road, Forres 
2. Mike Ross
1. 85sqm 
2. 0.07Ha
1. 27/6/18 
2. 3 years
1. £6,900 p.a. 
2. £8,000 p.a.
Permitted Use:
Car tuning business.
Page 79

Page 80

1. LO/1/223 
2. ALBU
1. Units 3, 4 & 5 Coulardbank
Business Centre, Lossiemouth 
2. The Met Office
1. 100sqm 
2. 0.01Ha
1. 15/10/18 
2. 3 years
1. £12,200 p.a. 
2. £11,700 p.a.
15/7/24 –
14/10/24 then
£12,200
Permitted Use:
Office & workshop
accommodation in
connection with
meteorological
functions of the tenant. 
New rent has a
reduction in lieu of
tenant taking on
several Business
Centre management
tasks for the Council.
1. KE/3/273 
2. ALBU
1. Unit Q2 Isla Bank Mills, Keith 
2. Wheel Racer Ltd (SC698181)
1. 308sqm 
2. 0.03Ha
1. 1/9/21 
2. 3 years
1. £9,000 p.a. 
2. £11,000 p.a.
Permitted Use:
Tyre/Wheel repair &
maintenance with
ancillary sales.
1. EL/5/121 
2. ALBU
1. 7 Perimeter Spur, Elgin 
2. Drumsmittal Properties Ltd
(SC145579)
1. - 
2. 0.04Ha
1. 2/9/84 
2. 5 years
1. £2,110 p.a. 
2. £2,110 p.a.
Permitted Use:
Offices & stores used
in connection with
Timber Preservation
Company.
No increase in rent as
already full rent. 
Page 80

Page 81

APPENDIX III 
REPORT TO THE ECONOMIC DEVELOPMENT & INFRASTRUCTURE SERVICES COMMITTEE ON 3 SEPTEMBER 2024 
GRANT OF SERVITUDES AND WAYLEAVES 
Officer Intls  File Ref  Address Description Price  Comments
CQ Electric
Wayleaves
Bilbohall Substation to Birnie
Road, Glassgreen, Elgin
Electricity Wayleave
Date of Entry – 3/6/24
£16,900 Wayleave granted to
Springfield/SSEN for new
high-voltage link to phased
development at Glassgreen. 
Page 81

Page 82

Page 82

Page 83

APPENDIX IV 
REPORT TO THE ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES COMMITTEE ON 3 SEPTEMBER 2024 
LIST OF PROPERTY DISPOSALS - SUBMITTED FOR NOTING 
Officer
Initials
Address Description Purchaser 1. Asking Price
2. Highest Offer
Declared
Surplus
Comments
IAWA Broomhill Lodge
Banff Road
Keith
AB55 6RX 
Former HRA property
declared surplus
Robert Stedman 1. £105,000 
2. £112,536 
15/9/22   
Page 83

Page 84

Page 84

Page 85

APPENDIX V 
REPORT TO THE ECONOMIC DEVELOPMENT AND INFRASTRUCTURE SERVICES COMMITTEE ON 3 SEPTEMBER 2024 
LIST OF ACQUISITIONS - SUBMITTED FOR NOTING 
Officer
Intls
Address Description Land Owner Purchase
Price
Declared
Surplus
Comments
STBE  48 Glenesk Road
Lhanbryde
IV30 8PW
2 Bedroom End
Terraced House
Michael & Deborah Ure £80,000 N/a Ex-Council property
purchased to add to Council
Housing stock. 
Page 85

Page 86

Page 86