Corporate Committee 
Tuesday, 28 January 2025 
NOTICE IS HEREBY GIVEN that a Meeting of the Corporate Committee is to be
held at Council Chambers, Council Office, High Street, Elgin, IV30 1BX on
Tuesday, 28 January 2025 at 09:30. 
BUSINESS 
1. Sederunt 
2. Declaration of Group Decisions and Members Interests * 
3. Resolution
Consider, and if so decide, adopt the following resolution:
"That under Section 50A (4) and (5) of the Local Government
(Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Item 12 of business
on the grounds that it involves the likely disclosure of exempt
information of the class described in the relevant Paragraphs of Part 1
of Schedule 7A of the Act.”   
4. Minutes of meeting of 5 November 2024 7 - 12
5. Written Questions ** 
6. Trust Properties in Elgin
Report by Depute Chief Executive (Economy, Environment and
Finance)  
13 - 18
7. Best Value Action Plan Monitoring Quartlerly Update
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
19 - 40
Page 1

Page 2

8. ICT Strategy and Plan 2025-2028 and Digital Update
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
41 - 58
9. Transformation Strategy Development
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
59 - 74
10. Leadership Development
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
75 - 86
11. Updated CCTV Policy
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
87 -
106 
Item(s) which the Committee may wish to consider with
the Press and Public excluded   
12. Proposed Chief Executive Performance Review Process
and Mentoring Support Arrangements [Para 1]
• 1. Information relating to staffing matters; 
Watching the Meeting
You can watch the webcast live by going to: 
http://www.moray.gov.uk/moray_standard/page_43661.html    
Webcasts are available to view for 1 year following the meeting.  
You can also attend the meeting in person, if you wish to do so,
please come to the High Street entrance door and a member of
staff will be let into the building. 
Page 2

Page 3

Summary of Corporate Services Committee functions:
To regulate, manage and monitor the finances of the Council both
capital and revenue; to deal with staffing policies and practices other
than for teaching staff; to deal with equal opportunities policies and
practices; to deal with procurement policies and priorities; to deal with
all matters relating to the Council’s duty to initiate, maintain and
facilitate Community Planning; to ensure that the organisation,
administrative and management processes of the Council are designed
to make the most effective contribution to achieving the Council’s
objectives; to provide all central support services; to exercise the
functions of the Council in connection with the Registration of Births,
Deaths and Marriages; to deal with valuation and electoral registration
matters.     
Page 3

Page 4

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how
the individual or members of the group will vote on any item(s) of business on
the Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any
relevant and competent business within the specified remits not already on the
agenda, to the Chair provided it is received by the Proper Officer or Committee
Services by 12 noon two working days prior to the day of the meeting.  A copy
of any written answer provided by the Chair will be published on the Council’s
committee management system by 4pm the day before the meeting.  The
Member who has put the question may, after the answer has been published,
ask one supplementary question directly related to the subject matter at the
meeting, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the
consent of the Chair. If a Member does not have the opportunity to put a
supplementary question because no time remains, then he or she can submit it
in writing to the Proper Officer who will arrange for a written answer to be
provided within 7 working days. 
Page 4

Page 5

MORAY COUNCIL 
Corporate Committee 
SEDERUNT 
Councillor Bridget Mustard  (Chair)
Councillor Kathleen Robertson  (Depute Chair)  
Councillor Theresa Coull  (Member)
Councillor John Cowe  (Member)
Councillor John Divers  (Member)
Councillor Amber Dunbar  (Member)
Councillor Jérémie Fernandes  (Member)
Councillor Sandy Keith  (Member)
Councillor Scott Lawrence  (Member)
Councillor Marc Macrae  (Member)
Councillor Paul McBain  (Member)
Councillor Shona Morrison  (Member)
Councillor Derek Ross  (Member)
Councillor Draeyk van der Horn  (Member)  
Clerk Name: Tracey Sutherland
Clerk Telephone: 07971 879268
Clerk Email: committee.services@moray.gov.uk 
Page 5

Page 6

Page 6

Page 7

MORAY COUNCIL 
Minute of Meeting of the Corporate Committee 
Tuesday, 5 November 2024 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor Theresa Coull, Councillor John Divers, Councillor Amber Dunbar,
Councillor Jérémie Fernandes, Councillor Sandy Keith, Councillor Scott Lawrence,
Councillor Marc Macrae, Councillor Paul McBain, Councillor Shona Morrison,
Councillor Bridget Mustard, Councillor Kathleen Robertson, Councillor Derek Ross 
APOLOGIES 
Councillor John Cowe, Councillor Draeyk van der Horn 
IN ATTENDANCE 
The Interim Chief Executive, Depute Chief Executive (Economy, Environment and
Finance), Depute Chief Executive (Education, Communities and Organisational
Development), Head of Governance, Strategy and Performance, Chief Financial
Officer, Head of HR, ICT and Organisational Development, Property Asset
Manager, Communities Service Manager and Democratic Services Manager.   
1.         Chair 
The meeting was chaired by Councillor Bridget Mustard.  
2.         Pre- Election Period 
The Chair reminded members that the Council is currently in a pre-election period
for the Elgin City South by election which was taking place on 7
November.  National guidance places restrictions on the Council publishing
material showing support for a particular political party.  Should the debate become
overtly political whilst being webcast, then as Chair, may need to intervene. 
3.         Declaration of Group Decisions and Members Interests 
In terms of Standing Orders 21 and 23 and The Councillors' Code of conduct the
Council noted that there were no declarations for Group Leaders or Spokesperson
in regard to any prior decisions taken on how members will vote on any item on the
agenda or any declarations of Member's interests in respect of any item on the
agenda. 
4.         Resolution 
The meeting resolved that in terms of Section 50A (4) and (5) of the Local
Government (Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Items 10 and 11 of business on
the grounds that it involves the likely disclosure of exempt information of the class.
Item 4.
Page 7

Page 8

Para number of the
minute Para Number of Schedule 7a
20 Para 1
Information on issues relating to staffing matters
21
Para 6, 8 and 9
Information relating to the financial or business affairs of
any particular person (s) 
Information on proposed terms and/or expenditure to be
incurred b the Authority. 
5.         Minutes of meeting of 27 August 2024 
The minute of the meeting of 27 August 2024 was submitted and approved.  
6.         Written Questions 
The Committee noted that there were no written questions.  
7.         Complaints Annual Report 2023-24 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) asked the Committee to note the
Complaints Annual Report 2023-24.  
Following consideration the Committee unanimously agreed to:  
i) note the contents of the Complaints Annual Report; and    
ii) approve the report for submission to the Scottish Public Services
Ombudsman.    
8.         Annual Procurement Report 2023-24 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) providing the Committee with the annual procurement
report (annual report) for 2023/24 in line with our duties under the Procurement
Reform (Scotland) Act 2014 (“the Act”). Once approved by the Committee a copy
of this report will be provided to the Scottish Government and published on the
Moray Council website.  
Following consideration, the Committee unanimously agreed to:  
i) note the procurement activities for the year 2023/24 as contained within the
annual procurement report;    
ii) note the procurement team are preparing the procurement strategy for
2024/25 which will be provided to Committee for review withihn the current
financial year; and    
Page 8

Page 9

iii) approves the planned improvement activities over the next two years (2024 -
2026) as detailed in the annual report (Appendix C) with summary provided
in section 5 below.    
9.         Best Value Action Plan Monitoring Quarterly report 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informed the Committee of
progress against the actions set out in the Council’s Best Value Action Plan since
the last quarterly update on 27 August 2024.  
Following consideration, the Committee unanimously agreed to note the progress
made against the actions in the Council's Best Value Action Plan (Appendix 1).  
10.         Corporate Risk Register Update 
The Committee had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) providing the Committee with the
quarterly overview of the Council’s principal risks as detailed in the Corporate Risk
Register.  
Following consideration, the Committee unanimously agreed to approve the
overview update on the Council's principal risks as at October 2024 attached as
Appendix 1 to this report.  
11.         Property Performance Indicators Report 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing the Committee of the performance of the
Council’s property assets and provide an update to Committee of the current
performance indicators.  
Following consideration, the Committee unanimously agreed to note the reporting
of these initial property performance indicators.  
12.         Performance Report - Financial Services - Period to September 2024 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing the Committee of the performance of the
service for the period to 30 September 2024.  
Following consideration the Committee agreed to:  
i) note performance in the areas of Service Planning, Service Performance and
other related data to the end of September 2024; and    
ii) note the actions being taken to improve performance where required.   
Page 9

Page 10

13.         Performance Report - Governance, Strategy and Performance -
Period to September 2024 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing the Committee of the
performance of the service for the period to 30 September 2024. 
Following consideration, the Committee unanimously agreed to: 
i) note performance in the areas of Service Planning, Service Performance and
other related data to the end of September 2024; and    
ii) note the actions being taken to improve performance where required. 
14.         Performance Report - HR ICT and OD - Period to September 2024 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing the Committee of the
performance of the service for the period to 30 September 2024.  
Councillor Keith raised concerns about the IT constraints that schools are working
within on a daily basis and and the impacts it is having on a daily basis upon the
schools ability to address pupil needs and could this be affecting attainment.  
In response, the Head of HR, ICT and Organisational Development confirmed that
officers are acutely aware of the issues across the Education Estate and the
impact that it is having on the ability for learning and teaching to take place.  She
further added that the Council's most experienced officers are working on the issue
and have sought advice from third party providers and good progress has been
made.  
Councillor Macrae sought whether Elected Members could play in any part to
assist with the work being carried out by the ICT service and asked whether the
Committee was agreeable to adding a third recommendation for the Chair of
Corporate and Council Leader write to the Cabinet Secretary for Education to
determine what mechanisms, working with Openreach to ensure that all
educational establishments across Scotland and in particular in Moray, have the
resources they require.  
Councillor Robertson added that she had represented the Council at a recent
Convention of the Highlands and Islands (COHI) meeting where there was a short
presentation on digital from the Scottish Government.  Suggestions were sought
on what Councils are needing to look at for digital services going forward and a
paper is going to be brought to the next meeting of COHI in March.  Councillor
Robertson confirmed, that she asked on behalf of Moray that the SWAN
connection and education broadband was looked at.  The Depute First Minister
was in attendance at the meeting so is aware of the issues being
experienced.  She further added that she would be happy to support a letter being
sent to the Cabinet Secretary for Education and the Depute First Minister to further
highlight the issues.  
Councillor Lawrence asked whether an update could be given on where the Moray
schools are within the R100 project and then include the position in letter and seek
an update on the R100 programme.  
Page 10

Page 11

The Head of HR, ICT and Organisational Development confirmed that she would
get an updated report on progress and whether the roll out of the R100 project was
part of the issues being experienced in the schools.  
Following further consideration, the Committee unanimously agreed:  
i) to note performance in the areas of Service Planning, Service Performance
and other related data to the end of September 2024; and    
ii) to note the actions being taken to improve performance where required; and    
iii) that a draft letter from the Council Leader and Chair of Corporate
Committee, to the Depute First Minister and Cabinet Secretary for Education
will be circulated to members of the Committee for approval, highlighting the
issues being experienced in Moray and seeking an update on the R100
project.    
15.         Armed Forces Covenant Gold Award 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) inviting the Committee to consider
and approve the request to amend policy to ensure maintaining the Armed Forces
Covenant Gold Award as a result of the essential criteria for the award becoming
more defined. 
Following consideration, the Committee unanimously agreed to approve the
amendment to the Special Leave Policy set out at paragraph 3.5 in the report.  
16.         Sustainable Development Statement 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) seeking approval of the Sustainable Development
Statement as required in terms of the Best Value Action Plan.  
Following consideration, the Committee unanimously agreed to approve the
Sustainable Development Statement as set out in Appendix 1 to the report, noting
that this will complete action 6.1 in the Corporate Best Value Action Plan 2024-
2027.  
17.         Transformation Strategy Development 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) asking the Committee to consider
and note progress on the delivery of the Council’s Transformation Strategy as part
of the ongoing monitoring of progress. 
Following consideration, the Committee unanimously agreed to note the progress
on the delivery of the Council's Transformation Strategy.  
18.         Flag Flying Policy 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) seeking approval for an updated
Flag Flying Policy.
Page 11

Page 12

Councillor Divers moved to include International Workers Memorial Day, where
flags fly at half mast for 1 day, this is usually at the end of April each year.  This
was seconded by Councillor Robertson.  
Following further consideration and there being no one otherwise minded the
Committee unanimously agreed to:  
i) approve the updated Flag Flying Policy in Appendix 1, with the inclusion of
International Workers Memorial Day; and    
ii) the publication on the Council website within the Second Tier Governance
Documents.   
19.         Moray Gaelic Language Plan 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) seeking approval to submit the
Moray Gaelic Language Plan (second edition) 2025-2030 to Bòrd Na Gàidhlig for
their endorsement.  
Following consideration, the Committee unanimously agreed to approve the Moray
Council Gaelic Plan 2022-27 (second edition) prior to formal submission to Bòrd
Na Gàidhlig for their endorsement.  
20.         Voluntary Severance and Voluntary Early Retirement Applications
[Para 1] 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) asking the Committee to
consider applications under the terms of the agreed Voluntary Early Retirement
(VER) and Voluntary Severance (VS) Schemes.  
Following consideration, the Committee unanimously agreed to approve the
applications for Voluntary Severance and Voluntary Early Retirement contained
within Appendix A.  
21.         Property Transaction - March Road East Buckie [Para 6 8 9] 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking the Committee to agree to main terms of sale for
a property on March Road East, Buckie.  
Following consideration, the Committee unanimously agreed to:  
i) approve the main terms of sale as set out in para 5 of this report; and    
ii) remit the Legal Services Manager to conclude the transaction.     
Page 12

Page 13

REPORT TO: CORPORATE COMMITTEE ON 28 JANUARY 2025
SUBJECT: TRUST PROPERTIES IN ELGIN 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1.  REASON FOR REPORT 
1.1 To apprise the Committee of updates on bringing vacant residential properties
held under public trusts back into use and for approval of proposed changes
to the scope of this activity. 
1.2 This report is submitted to the Corporate Committee in terms of Section (III)
(B) 20 of the Council’s Scheme of Administration relating to the management
of Trust property. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee: 
(i) notes the updates in relation to the refurbishment of the two
properties at Ladyhill and the anticipated payback period; 
(ii) agrees in principle that the six ‘Jubilee Cottages’ at Victoria Road
will be leased from the trust to the Council on terms and conditions
to be agreed by the Head of Housing and Property, the Head of
Governance Strategy and Performance and the Chief Financial
Officer; and 
(iii) authorise the Head of Housing and Property, in consultation with
the Chief Financial Officer and the Head of Governance Strategy
and Performance, to agree the detailed terms of the lease subject to
the proposal being financially sustainable. 
3. BACKGROUND 
3.1 Two cottages at Ladyhill, Elgin, (Ladyhill Cottages) and eight Victoria
Diamond Jubilee Homes in Victoria Road, Elgin, (Jubilee Cottages) are held
under separate trusts with the Council being the Trustees of each.  The
Ladyhill Cottages and two of the Jubilee Cottages had lain vacant for a
number of years, with the endowments provided having long since been
Item 6.
Page 13

Page 14

exhausted. Both of the Trust Funds ended up in deficit due to Council Tax and
other liabilities. 
3.2 Ladyhill Cottages were gifted by the Right Honourable Sir Archibald
Williamson in 1921 to the former City and Royal Burgh of Elgin to be held in
trust for the benefit of “suitable persons”. The trust property comprises two
cottages, being Suvla Cottage and Messines Cottage, together with an area
of garden ground, open space and access and approach to Ladyhill. The
cottages are Category C listed. Ladyhill Cottages are not registered with the
Office of the Scottish Charity Regulator (OSCR). 
3.3 Jubilee Cottages consist of a terrace of eight properties, which were built by
the City and Royal Burgh of Elgin in 1897 to establish a memorial to the
Diamond Jubilee Year of Queen Victoria. The properties were transferred by a
Deed of Trust to the Trustees in 1899. The cottages are also Category C
listed. 
3.4 Under the terms of the Trust Deed, Jubilee Cottages are to be used as far as
possible as ‘dwelling places or homes for poor people of respectable
character who are unable otherwise to provide comfortable homes of a similar
class for themselves’. As with Ladyhill Cottages, the preferences reflect the
wishes of the grantors, in this case being the former City and Royal Burgh of
Elgin.  Some of the detailed conditions are now considered archaic and un-
enforceable. 
3.5 In March 2017, the six mid-terraced Jubilee Cottages were renovated to
provide assessment and rehabilitation units, which are currently managed by
Health and Social Care Moray (para 18 of the minute of Policy and Resources
Committee on 30 August 2016 refers). At that time, the two end-terraced
cottages were still occupied by tenants, however they have since lain vacant.
The trust which governs Jubilee Cottages is registered with OSCR. 
3.6 Both of the Trust Funds are in deficit with no prospect of any income to offset
ongoing costs. The bulk of the ongoing property costs relate to Council Tax,
currently amounting to a total of £5,232 for the two Ladyhill Cottages and
£4,484 for the two Jubilee Cottages, which would increase significantly if the
six mid-terrace properties end up vacant on an ongoing basis. 
3.7 A proposal to lease the two properties at Ladyhill and the two vacant Jubilee
Cottages to the Council (HRA), in order that they could be refurbished and
relet, was approved by Corporate Committee on 7 November 2023 (para 14
of the minute refers). This arrangement was predicated on rental income
covering the costs over a payback period, following which the properties could
be returned to the trusts as a going concern.  Lettings would take place as far
as possible within the terms of the original trusts, noting that some of the
original terms are archaic. 
4. LADYHILL COTTAGES UPDATE 
4.1 An initial phase of work on the first of the two properties at Ladyhill (Suvla)
had been undertaken using grant funding and a contractor appointed to
complete the refurbishment.  This concluded in October 2024 and the
Page 14

Page 15

property is now tenanted, the occupant being a veteran of the armed forces,
which is in accordance with the original intentions. 
4.2 A specification for the refurbishment of the second property at Ladyhill
(Messines) was drawn up and put out to tender and work is underway.  It is
expected to be available to let in Spring 2025. This will end the double Council
Tax liability which had been increasing the deficit and provide high quality
housing on a sustainable basis. The cumulative cost (including fees) of these
refurbishments is £273k and a 30-year payback period is envisaged. 
5. JUBILEE COTTAGES TRUST 
5.1 Under the previous approval from Committee, plans were drawn up to extend
and renovate the two vacant end properties at an estimated cost of £155k.
Prior to these works being instructed, Health and Social Care Moray advised
of the intention to discontinue their use of the six mid-terrace properties with
effect from April 2025, therefore an alternative approach to future use of the
full terrace of eight properties has been considered.   
5.2 Following consultation with key stakeholders, it is considered that the eight
Jubilee Cottages are in reasonable condition to relet as social housing,
subject to a modest programme of works to ensure all current standards and
certification requirements are met. This would be on a similar basis as the
previously approved lease of two of the properties to the Council. 
5.3 Whilst acknowledging that without extension these properties are relatively
compact, there is a high level of demand for ground floor properties in this
area and there is therefore confidence that they can be sustainably relet. 
5.4 It is envisaged that a modest programme of works will be undertaken prior to
reletting the properties under a local lettings plan, endeavouring to be faithful
to the original trust conditions. Consideration will also be given to utilising 2 or
3 of the properties as temporary accommodation for those meeting the terms
of the letting plan who require this type of property, which may include those
awaiting adaptations to their own homes or allocation of alternative
accommodation as an alternative to a hospital or care environment. 
5.5 Whilst detailed costings have not yet been undertaken, allowing for £160k
(£20k per property), would enable a shorter payback period of around 10
years. 
6. SUMMARY 
6.1 An update report was provided to the Asset Management Working Group on
13 December 2024, which agreed that the proposed actions be reported to
this Committee for consideration and approval. 
6.2 It is noted that the refurbishment and occupancy of the Ladyhill Cottages is
progressing and will conclude in Spring 2025, with an anticipated lease
duration from the trust to the Council of 30 years. 
Page 15

Page 16

6.3 It is proposed that the scope of the lease of the Jubilee Cottages to the
Council be revised to include all eight properties, upon the handover of the six
currently administered by Health and Social Care Moray. Further to this, a
programme of refurbishment and upgrades will be carried out and the lease
duration will be predicated on the payback period, estimated at in the region
of 10 years. 
7. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
This report details an approach to bringing vacant residential properties
back into use in a way that is financially sustainable for the Council and
trusts.  The Corporate Plan and LOIP identify the need to address the
shortage of affordable housing and tackle homelessness while working
towards creating a sustainable Council that provides valued services to
the community. 
(b) Policy and Legal
This report deals with the Council’s legal duties as Trustees. The
Trustees have full responsibility for the management of the two public
trusts with reference to the trust purposes.  In the absence of any powers
in a deed of trust then the powers under the Trusts (Scotland) Act 1921
apply. These powers include granting leases provided that they are not
at variance with the terms and purposes of the trust. 
(c) Financial Implications
If the properties remain vacant the trust funds would continue to operate
in deficit, incurring additional annual costs of at least £9,713 in respect of
Council Tax alone, with additional miscellaneous costs incurred as
required for reasons of health and safety. 
The cumulative cost of refurbishment of the properties at Ladyhill,
including fees, is £273k. Based on this, with annual allowances for
ongoing management and repairs and maintenance, a lease duration of
30 years is anticipated. The rental charge is currently based on Local
Housing Allowance, however, consideration will be given to aligning this
with the Council’s broader rental structure provided this does not
significantly elongate the payback period. 
Given the proposed reduction in scope of the Jubilee Cottage works, it is
envisaged that the overall spend will be significantly lower for each of the
properties and therefore the payback period reduced accordingly.
Therefore, the previous allowance of £155k for two properties instead be
£160k for eight properties, with an anticipated lease duration of 10 years.
When setting rental charges for these properties, consideration will be
given to the Local Housing Allowance rate and Council rental structure,
as well as the impact these would have on sustainably letting the
properties and payback period. 
Page 16

Page 17

(d) Risk Implications
If the changes are not agreed, the properties will remain unoccupied and
the trusts will incur holding costs. The proposals provide a mechanism
for bringing each of the properties back into use. 
(e) Staffing Implications
There are no staffing implications arising from this report. 
(f) Property Implications
The property implications are set out in the body of the report. 
(g) Equalities/Socio Economic Impact
A stage 1 Integrated Impact Assessment identified no adverse impacts. 
The proposals involve bringing ten dwelling houses back into use, which
would then be let out in accordance with the Council’s Allocations Policy,
under a lettings plan. There is no change to Council services involved.
(h) Climate Change and Biodiversity Impact
There are no climate change or biodiversity implications arising from this
report. 
(i) Consultations
The Depute Chief Executive (EEF), Head of Housing and Property, Head
of Governance Strategy and Performance, Chief Financial Officer, Legal
Services Manager, Property Asset Manager, Jamie Fraser (Senior
Accountant), Democratic Services Manager, and Equal Opportunities
Officer have been consulted and their comments incorporated in the
report. 
The properties sit within Wards 6 and 7.  Ward Members, Councillors
Peter Bloomfield, John Divers, Amber Dunbar, Jeremie Fernandes,
Elaine Kirby and Sandy Keith, are aware of the proposal and may make
their views known at Committee. 
8. CONCLUSION 
8.1 The Trusts have been operating in deficit, which means that the
Trustees are unable to fulfil the trust purposes without identifying an
alternative funding source. 
8.2 The Trustees have power to grant a lease to the Council on terms and
conditions that would allow the trust purposes to be delivered while
bringing ten dwelling houses back into use. 
Author of Report: Edward Thomas, Head of Housing & Property Services
Background Papers: Held by author
Ref: SPMAN-1285234812-1737 
Page 17

Page 18

Page 18

Page 19

REPORT TO: CORPORATE COMMITTEE 28 JANUARY 2025 
SUBJECT: BEST VALUE ACTION PLAN PROGRESS REPORTING 
BY:  DEPUTE CHIEF EXECTUIVE (EDUCATION COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT 
1. REASON FOR REPORT 
1.1 To inform the Committee of progress against the actions set out in the
Council’s Best Value Action Plan since the last quarterly update on
4 November 2024. 
1.2 This report is submitted to Committee in terms of paragraph III B (41) of the
Council’s Scheme of Administration, Best Value being a cross-cutting issue
that does not fall within the remit of a particular committee. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee reviews and notes the progress
made against the actions in the Council’s Best Value Action Plan
(Appendix 1). 
3. BACKGROUND 
3.1 Councils in Scotland have a statutory duty to demonstrate Best Value,
introduced in the Local Government (Scotland) Act 2003.  Statutory Guidance
defines Best Value as:   
Ensuring that there is good governance and effective management of
resources, with a focus on continuous improvement, to deliver the best
possible outcomes for the public. 
3.2 In March 2020 the Scottish Government published refreshed Best Value
guidance requiring councils to demonstrate a focus on continuous
improvement in performance around seven themes:
• Vision and leadership
• Governance and accountability
• Effective use of resources
• Partnerships and collaborative working
• Working with communities
• Sustainability
• Fairness and equality
Item 7.
Page 19

Page 20

3.3 The Corporate Committee on 23 April 2024 agreed a new Best Value Action
Plan that set outs the Council’s priorities for the next 3 years to enable it to
meet its Best Value duty (paragraph 6 of the minute refers).  The Plan takes
account of and supersedes the consolidated list of improvement actions which
bring together recommendations from a number of sources in relation to the
Council’s progress in achieving its Best Value duty and the output from the
Council-Wide Strategic Self-Assessment of Performance by both Councillors
and officers. 
3.4 The Committee also agreed that the Best Value Action plan will be monitored
on a quarterly basis and Appendix 1 provides the quarterly monitoring of the
actions in the Plan for October to December 2024.  As well as reporting to
Committee, arrangements are in place to ensure that the Corporate
Management Team has regular oversight of performance monitoring of
progress on the actions in the plan to ensure that work is prioritised and early
remedial action can be taken if required. 
3.5 Progress is on target in implementing the actions in the Best Value Action
plan with a number of actions being concluded.  Overall there 64 actions in
total, of which 26 are black (completed) actions, 26 green (on target), 9 amber
(require monitoring), no reds and 3 actions that have yet to commence.  Key
highlights in progress as noted below: 
i)  Public communication and engagement: the Council engagement strategy
has been implemented in relation to the general budget position as well as
decisions of the council on financial planning, including libraries
consultation. Feedback on this is due to be reported to the council early in
2025. Relevant progress is reflected in Appendix 1 against the Vision and
Leadership, Effective Use of Resources and Working with Communities
themes. 
ii)  Financial management – Work has been progressed on a number of the
actions within this theme and reported to the council on 4 December 2024:
Corporate Asset Management Plan; Forecasting of budget projections,
further development of savings plan for short to medium term and the
medium to long term financial plan. 
iii)  Transformation Strategy update and development of next set of projects
was reported to Council in August and a further update report was
considered by Corporate Committee on 4 November 2024 for this
committee to ensure regular oversight and monitoring. 
iv)  Sustainable development – a strategic sustainability statement was
approved at Corporate Committee on 4 November 2024.
Page 20

Page 21

3.6 The Best Value Action Plan sets out an ambitious programme of work and it is
important to maintain pace to ensure that targets are delivered.  As indicated
in the appendix, while overall progress is positive with 26 actions now
completed, there are a small number (9) areas that have been identified for
close monitoring: 
i) Leadership development – action is being taken to progress a short
term programme of development and to ensure that individual
development needs are identified.  A draft strategic position has been
prepared but finalising this is proposed to be put on hold until the new
Chief Executive can provide direction on some of the cultural aspects
that need to be part of this work. 
ii) Partnership working – the absence of specific resource has been a
barrier to progress. This is an issue across partners and recent
discussions have identified some options to provide capacity which is
being explored further in anticipation of proposals coming forward in
the new year that will enable this work to come back on track. 
iii) ICT developments – there are a few amber actions relating to the
demand for ICT resources.  The service is prioritising work across
various requirements but there is likely to be ongoing pressure as
resources cannot accommodate all of the current service requests.
This will be carefully monitored by the CMT. 
3.7 The next planned stages of work over the coming quarter are noted against
each of the actions in the progress update (Appendix 1).  Highlights of
actions due to be reported to Corporate Committee (CC) on 10 June or Full
Council (FC) as appropriate are noted below: 
Vision and Leadership 
i) Leadership development – proposals are under development
(Dec 2024) – CC January 2025. 
Effective Use of Resources 
i) Next stage of short to medium term financial planning – FC January
2025.
ii) Transformation strategy – development of expanded set of projects and
financial benefits (December 2024) - CC January 2025. 
Community and Partner Engagement 
i) Consultation on specific budget proposals (Nov/Dec) – Full council
January/February 2025. 
3.8 It is also of note that the Annual Audit Review has been completed and was
reported to the Council at its meeting on 22 October 2024.  The actions from
the annual audit are being progressed and will be captured in a future update
to ensure the Best Value Action plan remains comprehensive and current.
Page 21

Page 22

4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The Best Value Action Plan supports the Council to deliver the priorities
in the corporate plan and supports the council values of Improving: drive
improvement; Ambitious: ensure sustainable and efficient services; and
Responsive: promote community participation and involvement and
involve our communities. 
(b) Policy and Legal
The Best Value Action Plan supports the Council to fulfil its statutory duty
to demonstrate Best Value, introduced in the Local Government
(Scotland) Act 2003. 
(c) Financial implications
There are no specific financial implications, however, the Best Value
Action Plan supports the Council in its duty to make best use of
resources and there are a number of specific actions that relate to
financial management that are moving forward. 
(d) Risk Implications
There are risks associated with not making adequate progress on the
actions set out in the Best Value Action Plan.  The Council has had
feedback from a number of external stakeholders that identified areas for
improvement and failure to address these through the planned actions is
likely to lead to adverse reporting and implications for the council. 
Several of the Best Value themes feature on the Council’s Corporate
Risk Register including leadership, financial sustainability and workforce
development.  Progressing the actions in the Plan will also secure
improvements in the management of these risks. 
(e) Staffing Implications
There are no specific staffing implications arising from this report. 
(f) Property
None 
(g) Equalities/Socio Economic Impact
This is covered in the Best Value inspection regime itself and the
Council’s duty to deliver best value. 
(h) Climate Change and Biodiversity Impacts
This is a key component of Best Value 
(i) Consultations
Extended CMT (E/CMT) have contributed to the progress monitoring set
out in Appendix 1.
Page 22

Page 23

5. CONCLUSION 
5.1 This report provides the quarterly monitoring of the Council’s Best
Value Action Plan (Appendix 1) for October to December 2024.  Progress
continues to be made across all of the areas of the plan with 26 areas
where actions have been completed and work continues to ensure the
plan is completed on target. 
Author of Report: Denise Whitworth
Background Papers: Corporate Committee report on Best Value Action plan
23 April 2024 (item 5a) 
Corporate Committee report on 27August 2024 Best
Value Action Plan (item 11) 
Corporate Committee report on 5 November 2024 Best
Value Action Plan (item 8)
Ref: SPMAN-1108985784-1038 
Page 23

Page 24

Page 24

Page 25

Appendix 1
Report Date December 2024 (Corporate Committee 28/01/2025)
BRAGG Status - KEY BLACK -
Completed
RED -
Concern
AMBER -
Caution
GREEN On
Target
GREY - Not
Started
Lead Officer Priority Delivery Date Schedule % Complete
BEST VALUE ACTION PLAN Aug-26 GREEN 63%
Mar-26 GREEN 69%
CEx/Council (CL) 1 Dec-24 AMBER 85%
DCE (ECOD) 3 Jun-25 GREEN 53%
H HR,ICT & OD 1 Dec-24 AMBER 80%
CEx / DCE (ECOD) 2 Mar-26 GREEN 27%
DCE (ECOD) 3 Jun-24 Complete 100%
Jan-25 GREEN 67%
HoGSP 3 Oct-24 Complete 100%
Cex 1 Jan-25 AMBER 80%
HoGSP E April 24 /  25* AMBER 73%
H HR,ICT & OD E Sept 25* AMBER 15%
Summary: 
Work progressed as planned on collaborative leadership with report to Council on 4/12/24 setting out progress and planned next steps, including a survey in early 2025 to measure
impact.  Community Planning Board considered community engagement at a development session in October and identified opportunities for development to be taken forward in the
new year as part of the approach to the LOIP. 
Leadership development preparations are progressing.  However, with revisions to the corporate management structure being developed and a new Chief Executive due to start in
post in March, work on delivery of leadership development will be more appropriately implemented from March 2025.  
Implementation of self-evaluation to deliver continuous improvement is progressing with the re-activation of the PSIF process moving forward and planned work with the
Improvement Service to support delivery. The Council engagement strategy for financial planning has been implemented with information and engagement activity through October,
November and December  for reporting to the council to inform and influence financial planning in the new year .  All actions within this BV theme are currently on target.
2.2 Sound Governance
Summary:
The 6 month review of scrutiny training is not yet due. Under the Risk Management project, the annual review of departmental risk registers that feed wider risks into Corporate Risk
Register is complete as is the work on the corporate overview of business continuity and resilience which was reported to committee in April 2024.Work on business continuity is
progressing as planned. 
Work on digital resilience is progressing with the first stage of the Board level desktop exercise completed and preparation for the next phase of workforce training and awareness in
the final stages of preparation.
1. Vision and Leadership
2. Governance and Accountability
1.1 Collaborative Leadership - ensuring members and officers work effectively to secure key
1.2  Community and Partner Engagement on Council priorities
1.3 Leadership Development Action
1.4 Continuous Improvement – implement self-evaluation.
2.1 Effective Scrutiny
1.5 Performance Reporting
2.3 Risk Management
2.4 Digital Resilience Management
Item 7.
Page 25

Page 26

Appendix 1
Aug-26 GREEN 82%
CEx / DCE (ECOD) 1 Aug-26 GREEN 55%
CEx 2 Sep-24 Complete 100%
CEx / DCE (EEF) / CFO 1 Dec-24 GREEN 91%
Oct-25 #REF! 26%
DCE (EEF / ECOD) 2 Oct-25 #REF! 26%
Jun-25 GREEN 48%
DCE (EEF / ECOD) 2 Jun-25 GREEN 48%
Sep-24 GREEN 55%
DCE (EEF) 3 Sep-24 GREEN 55%
Summary:
Progress has been made in mapping the Council Corporate strategies relevant to sustainable development against National Performance Indicators and corporate priorities; identify
areas of focus 2024-2029, SD changes expected and PIs to monitor progress; finalise draft principles. It is planned to bring this forward for wider consultation and involvement on the
sustainability statement.
Dec 2024: The Statement was agreed at committee on 4.11.24. This included a small number of actions for completion by the end of 2025. As the action plan is now agreed, the end
date for actions has been adjusted to December 2025 with progress on these ongoing including a report to council on 4.12 and a paper to the next meeting of the Community Planning
Board on 3.12.24 on collective action on sustainable development and climate change.
Summary: 
Guide to mainstream PB developed by CSU and circulated to all services.  Consideration is being given to the use of online tools and website enhancement to support engagement. 
Work to review the operation of the Community Engagement Group has been completed and considered by the Group and was considered at the CPB development session in October
2024 where future approaches were identified.  These are being taken into account in the proposals being developed for the CPB for the development of locality working. £109,000
via UK shared prosperity fund was allocated via PB to eligible arts, culture and heritage groups (July 24).  Progress is being made in mainstreaming PB principles into the council's
approach to financial planning.  Event scheduled for November 2024 as part of engagement work to encourage community influence was cancelled due to low sign up.  Consideration
is being given to how best to address this for future.
Draft list of current PB type activity circulated to Heads of Service and will be used to guide future activity.
Summary:
Work with community planning partners is moving forward to develop shared priorities for the LOIP and there is early indicative support to develop a single Moray plan.  Locality plans
are well developed and ongoing and consideration is now planned of learning across partners and service areas to identify opportunities for learning and greater impact from partners
working more closely.  There has been limited progress for Nov/Dec due to other priorities, however, work continues on building on the positive work within the partnership in the
approach to locality working.  Discussions are also taking place between partners on options to dedicate resources to partnership work to enable more focussed action on Partnership
Working for Moray in 2025 and it is hoped this will assist in taking forward planned developments.
Summary: 
The refresh and refocus of the Transformation Strategy is complete and was approved by the Council in April 2024.
Further updates were presented to the Council in August 2024, with further definition of the strategy and including development of new projects and in October and November with a
new project agreed by Council on 22/10 and an update to corporate committee on 5/11. Work is also well progressed on developing planned projects which following a member
workshop are nearing readiness for reporting and progress  continues on active projects. On workforce, the workforce working group has completed its planned work to update
workforce strategy and this was reported in August.
The 10 year capital plan has been reviewed by officers under the Financial Management project with the cap mechanism agreed in October 2024 and the review having progressed in
November/December for reporting in January 2025.  The Revised Short to Medium Term Financial Strategy is complete and was reported to Council on 26 June 2024. The medium to
long term financial plan was reported to Council on 4 December.   Revenue estimated actuals reported in December and corrective action planned.   Significant strategic service
reviews completed. Further work is underway for the remaining actions and to continue to develop the short to medium term financial position taking account of the budget
settlement.  
Corporate Workforce Strategy and Plan agreed at Corporate Committee on 27 August and is now being implemented as part of normal HR-OD work.
4.1 Partnership Working for Moray
5.1 Community Budget Engagement ensuring local communities are more in Participatory
6.1 Sustainable Development
5. Working With Communities
6. Sustainable Development
3. Effective Use of Resources
4. Partnerships and Collaborative Working
3.3 Financial Management
3.2 Workforce Planning
3.1 Transformation and Sustainable Services
Page 26

Page 27

Appendix 1
Normal business GREEN 97%
HoGSP 2 Normal business GREEN 97%
Summary: 
This workstream is well advanced and the planned actions are complete for: equality and socio-economic duty actions and consideration of these within committee reports;
Integrated Impact Assessments were carried out on budget proposals and the views of equality groups were sought where appropriate. The remaining action is for staff training on
equalities and the council equalities as an employer and this is underway and on target. 
Dec 2024: Further refinement of the paper on sponsored eLearning has been carried out and is with DCE prior to going to CMT for final sign off.
7.1 Equalities Action
7. Fairness & Equality
Page 27

Page 28

Report Date December 2024 (Corporate Committee 28/01/2025)
BRAGG Status - KEY BLACK -
Completed RED - Concern AMBER -
Caution
GREEN On
Target
GREY - Not
Started
Overall Schedule % Complete
GREEN 69%
Schedule Complete
AMBER 85%
Actions: Lead Schedule Start Date End Date % Complete
i Best value relationships project successfully
concluded (May 24). JWM Complete 28/03/24 20/08/24 100%
ii. Review undertaken to assess the level to which
relationships have improved across Members/ snr
officers and clarity regarding roles and
responsibilities. (Dec 24).
JWM AMBER 01/08/24 24/12/24 80%
iii. Collaborative leadership programme
established drawing on best practice (Oct 24). JWM Complete 01/08/24 31/10/24 100%
iv. Joint political leadership continues to develop
so members work effectively on key decisions
including financial sustainability.
JWM AMBER 01/08/24 24/12/24 60%
Schedule Complete
GREEN 53%
Actions: Lead Schedule Start Date End Date % Complete
I Build Council vision, priorities and values into
employee engagement programme work. FG GREEN 01/07/24 30/06/25 50%
ii. Promote vision and priorities in public
communication and engagement and social media. DW/FG GREEN 01/07/24 30/06/25 50%
Council report
25/09/24 (item9)  -
savings plan -
engagement
strategy appendix
Council report
21/01/2025 (Item 5) -
savings plan -
engagement
strategy appendix
Summary: 
Work progressed as planned on collaborative leadership with report to Council on 4/12/24 setting out progress and planned next steps, including a survey in early 2025 to measure impact.  Community Planning Board considered community engagement at a development session in October and identified opportunities for development to be taken forward in the new year as part of the approach to the LOIP. 
Leadership development preparations are progressing.  However, with revisions to the corporate management structure being developed and a new Chief Executive due to start in post in March, work on delivery of leadership development will be more appropriately implemented from March 2025.  
Implementation of self-evaluation to deliver continuous improvement is progressing with the re-activation of the PSIF process moving forward and planned work with the Improvement Service to support delivery. The Council engagement strategy for financial planning has been implemented with information and engagement activity through October, November and December  for reporting to the council to inform and influence financial planning in the new
year .  All actions within this BV theme are currently on target.
DELIVERY DATE: Dec 24
DELIVERY DATE: Jun 25
1. Vision and Leadership
19 December 2024 Code of Conduct
Issues, Risks, Changes (I/R/C) Hyperlink to document
Dec 2024: political issues around party press releases in relation to a libraries budget proposal had potential to set
back the progress made. These were however dealt with in a collegiate way in a special council meeting on 19
December 2024 which councillors recognising the need for further training in relation to budget decision making. 
Financial planning workshop sessions diaried for members in August and preparatory work on course. An draft
annual programme of Member/Officer Workshops will be prepared by December.
Progress Update Next Steps
Dec 2024:   TTD issued 14/11. Reference to vision, priorities as appropriate in public and staff communications.
05-11-24 Detailed delivery plan developed and agreed at council along with engagement strategy on 25-09-24             
Detailed plan being developed with OD and Comms teams to ensure a planned and co-ordinated approach to
deliver outcomes required across all areas of the employee engagement programme, public communications and
engagement and social media ensuring appropriate alignment and co-ordination of public and workforce
messaging.             
Dec 2024:  Detailed work on overall approach to employee engagement continuing with
proposals for review and updating being developed further.
5-11-24: Information to be issued to provide update and shared understanding on current
position to workforce and community. Will include feedback on previous work on vision,
values and priorities, response to feedback and action since
Dec 2024:  Engagement to take place with public and workforce over October (information) and November
(engagement) to enable influence on council financial planning linked to priorities:                 
> Teamtalk dialogue to be cascaded (Oct - Nov)                                       
> Public information issued (Nov)                                                                                                                                                             
> Public/staff survey open on general financial planning (Nov/Dec)                                                                                                                                                                    
> Public engagement session planned for Nov was postponed due to low take up and feedback that more specific
topics would be of more interest.  Plan to re-organise when specific topics are agreed by the council for discussion.                                                                       
> Specific consultation and engagement on libraries proposal took place (Nov)      
05-11-24: Council engagement strategy agreed at Council on 25-09-24 to take forward engagement on priorities
and financial planning. Delivery plan for strategy also approved and planning in place to begin delivery in October.
Workforce engagement plans discussed with trade unions at TU/Officer meeting and JCC (18/09/24) to build on
previous experience and develop next engagement in light of that.  Teamtalk dialogue approach to be used across
workforce with parallel engagement to community work on council priorities and financial planning run in October.     
Detailed plan being developed with OD and Comms teams to ensure a planned and co-ordinated approach to
deliver outcomes required for communication and engagement activity. A summary of planned engagement work
has been prepared and is being shared with/CMT for awareness and oversight           
Bid submitted for investment in online engagement tool.   
Report back to Council (Jan)                                                               
Continue development of sourcing online tool (once budget secured)
5-11-24: Engagement to take place with public and workforce over October (information)
and November (engagement) to enable influence on council financial planning linked to
priorities:                 
Teamtalk dialogue to be cascaded (Oct - Nov)                                       
Public information issued (Oct)                                                                        
Public/staff survey on general financial planning (Oct/Nov)                             
Public engagement session    (Nov)                                                                              
Report back to council (Dec/Jan)                                                              
Continue development of sourcing online tool (once budget secured)
Dec 2024:  Further training on Code of Conduct and budget decision making to be
scheduled for early 2025
1.2  Community and Partner Engagement on Council priorities PRIORITY 3Lead: DCE (ECOD)
1.1 Collaborative Leadership - ensuring members and officers work effectively to secure key decisions Lead: CEx/Council (CL) PRIORITY 1
External consultant completed this phase of work by 31 May 2024 and the findings were reported to Corporate
Committee on 27 August 2024.
This action is complete and the Report recommendations are being progressed and tracked
as part of other actions identified in the BV Action Plan
Dec 2024: In compliance with the previous decisions on the report relating to progress on Collaborative Leadership
Development Work considered by the Corporate Committee on 27 August, a further update report on progress was
presented by the Interim Chief Executive to Council on 4 December 2024 in lieu of the external consultant
returning to conduct a review.  Positive progress was reported with more work required and being progressed to
embed the relationship changes necessary to enhance the Council's culture.
A progress review is planned for December 24.
Dec 2024: A 'pulse' survey will be issued to elected members and chief officers in January to  
establish a revised baseline in advance of the new Chief Executive starting in post in March
2025.  The analysis of the results will be completed in February and subsequently reported
to Council.
Sessions with groups previously established by the external consultant to be organised for
November to ensure progress with Collaborative Leadership development work continues.
Dec 2024:The Collaborative Leadership Programme was established with a progress update on delivery provided in
a report to Moray Council on 4 December 2024.  The Leader & Interim Chief Executive continue to work
collaboratively to develop positive working relationships internally and with external partners and local
organisations to promote the Council's work. Members' Lounge option agreed. 
The Leader and Interim Chief Executive continue to work collaboratively and develop positive working relationships
with external partners and local organisations to promote the Council's work. Members' Lounge option agreed.
Future reports on progress with collaborative leadership will continue to be monitored
through regular reporting in the Corporate Best Value Action Plan updates to Council.  A
corporate management structure review is now scheduled to be progressed by February. 
Therefore, it is appropriate to align the implementation of the Leadership Dev. Prog. after
the structural work and start date of the new Chief Executive.
A corp. management structure review is now scheduled for completion by February. 
Therefore, it is appropriate to align the implementation of the Leadership Dev. Prog. after
structure work.
Next StepsProgress Update
Hyperlink to documentIssues, Risks, Changes (I/R/C)
Page 28

Page 29

iii. Working with Community Planning Partners
(CPP) to develop shared engagement. DW GREEN 01/07/24 30/06/25 35% CPP feedback report and presentations from
development session 24/10
iv. Take forward engagement and consultation on
service specific proposals e.g. for libraries and
leisure.
DW GREEN 01/08/24 30/06/25 50%
Library Council report (22/10/2024 item 10
*confidential*                
Teamtalk dialogue and Cex email  Survey (lib
and general)   Public information links
v. Establish Community survey/panel, jointly with
partners if agreed DW Not Started 01/08/24 30/06/25 0%
vi. Staff survey – add questions on priorities. FG GREEN 01/08/24 30/06/25 80%
Schedule Complete
AMBER 80%
Actions: Lead Schedule Start Date End Date % Complete
i. Establish leadership development programme to
address corporate and individual leadership needs FG AMBER 01/07/24 24/12/24 80%
Schedule Complete
GREEN 27%
Actions: Lead Schedule Start Date End Date % Complete
i Re-establish Public Service Improvement
Framework (PSIF) as service continuous
improvement tool.
AMcE GREEN 01/07/24 31/03/26 60%
ii. Align other improvement tools to PSIF. AMcE GREEN 01/07/24 31/03/26 40%
iii. Put in place measure to address gap. AMcE GREEN 01/07/24 31/03/26 40%
iv. Continue corporate BV self-assessment for
yearly. DW/AMcE Not Started 01/08/24 31/03/26 0%
v. Agree updated BV action plan for continuous
improvement. DW/AMcE Not Started 01/08/24 31/03/26 0%
DELIVERY DATE: Dec 24
DELIVERY DATE: Mar 26
Dec 2024:  Work is at very early stages to consider options and how these would contribute to the council's
engagement strategy.  Mar 24 - proposal to be developed
Dec 2024:  Council approved library proposals for consultation on 22/10.  Public and workforce communications
were issued per stage 2 of the engagement strategy and a survey issued to facilitate responses. Over 2000
responses were received to the Library survey and these have been analysed and will be reported to the council in
the new year.  The Council also approved savings on 4 December 2024, however, there are limited specific
requirements for public consultation on these.
05-11-24 - Engagement strategy approved on 25/09/24 sets foundation and plan to take this forward for libraries
following council decision on 22/10/14 after the 7/11 by election
Subject to council decision on 22/10 - library consultation under Stage 2 of the engagement
strategy
Dec 2024: Agreed to  adopt a 33  question psif l for all services apart from those who have their own regulatory or
professional assessment model such as "how good is our school". Further work requested  to evaluate which
services have suitable alternative continuous improvement models.
Survey of services complete. 3mb went to  CMT in  October to agree methodology.
Agree review schedule with services. Incorporate improvements into service plans/team
plans/ERDP  where appropriate.
Dec 2024:  Papers reviewed and further developed following feedback from CMT and ECMT.  To progress with
implementation of operational aspects within budget and underlying strategy to be considered with new CEx but
ready to be reported to Full Council as required.  Timescales reviewed to enable reporting to Full Council in 2025.
05-11-2024 Strategy and plan drafted, scheduled for CMT and circulated to ECMT for comments and on agenda for
Corporate Committee for January 2025
Work undertaken during early part of 23/24 being reviewed and refreshed taking account of feedback from CMT. 
Project plan drafted with detailed actions, milestones, allocation of work to ensure adherence to timescales,
supporting development of Leadership Development strategy.  Focus as a matter of priority on Senior Leadership
Development (1st and 2nd Tier) with phased approach planned to ensure that agreed approach filters through 3rd
and 4th tier and further.  Papers being prepared with a view to reporting to CMT in August and Full Council in
Sept/Oct.
Dec 2024:  Timescales and phased approach to be considered given work on corporate
management review, due to report in February 2025 and the appointment of new,
permanent Chief Executive, due to take up post in Spring 2025.
1.4 Continuous Improvement – implement self-evaluation. PRIORITY 2
Progress Update Next Steps
Dec 2024:  Questions drafted and added to survey due March 25 for approval.
05-11-24 Suggestions for additional questions survey being drafted and survey refreshed for 2025.
Adding questions on priorities to employee survey is being picked up as part of the plan referred to in lines 18 and
19 above.
1.3 Leadership Development Action PRIORITY 1Lead: H HR,ICT & OD
Dec 2024:  CPP considered feedback from report outcomes of engagement review work at October development
session (24/10) and identified opportunities to develop                  
Further work on locality partnership working to inform future Loip (Mar 2025).  It is planned to advance this in the
new year.
05-11-24 - the CPP development session on 24/10 will include consideration of the findings from the SCDC work
below relating to localities work and the outcome of this will  be used to contribute to the self-evaluation that the
CPP will be carrying out as part of the national programme being led by the Improvement Services.                                                                                                            
Work has also begun in September with CP  partner  Locality  specialists  to identify way forward and further work
will be progressed for inclusion in the future approach to the LOIP and potential One Moray plan       
Development sessions been held with community planning partners to consider priorities and how can take
forward collectively.  This will inform engagement                                        
Work ongoing to review the role of the Community Engagement Group and define moving forward.                                                                   
Work also taking place through the Scottish Community Development Centre (SCDC)  to review and learn from
current practice
Further work on locality partnership working to inform future Loip (Mar 2025)
June 25 - report to CPB on proposal for the development of locality working aligned to CPB
priorities
Report outcomes of engagement review work (Oct/Nov)                      
Further work on locality partnership working to inform future Loip (Mar 2025)
Survey of services complete. 10 Oct 3mb due to CMT to agree methodology.
Dec 2024:  no update
Dec 2024:  Plan to undertake 2nd self-assessment in March 2025
Completed Apr 24
Due March  2025
Agreed April 24
Due April 2025
Survey of services complete. 10 Oct 3mb due to CMT to agree methodology.
Dec 2024:  no update
Issues, Risks, Changes (I/R/C)
Dec 2024:  Approval for updated survey questions required then work taken forward to
launch March 2025
Progress Update Next Steps
Hyperlink to document
Hyperlink to document
05-11-2024 Risk of not meeting BV deadline
if not agreed at Corporate Committee in
January.
Issues, Risks, Changes (I/R/C)
Page 29

Page 30

vi. Consider and establish service score cards to
provide overview to develop and track service
improvement corporately.
DW/AMcE GREEN 01/08/24 31/03/26 20%
Schedule Complete
Complete 100%
Actions: Lead Schedule Start Date End Date % Complete
i. Finalise the performance and delivery framework
for the new Corporate Plan. DW Complete 28/03/24 28/06/24 100% Service Plans (ECOD)
ECLS  20 June 2024 Item 04
ii. Publish Public Performance Report (PPR). FG Complete 28/03/24 28/06/24 100%
DELIVERY DATE: Jun 24
Corporate Plan agreed by Full Council on 28/02/24           
Service plans agreed in May/June committee cycles
PPR agreed at Full Council on 26/06/2024 and published on the Council's website on 28/06/2024.
Work to develop Pentana ongoing, initial work to present performance overview on landing page for one sample
service complete, progress is slow as individual queries to be written.
Dec 2024:  No Update
Confirm whether Pentana work meets Scorecard expectation
1.5 Performance Reporting PRIORITY 3
Progress Update Next Steps
Lead: DCE (ECOD) Hyperlink to documentIssues, Risks, Changes (I/R/C)
Corporate Plan
Full Council 28 June 2024 Item 4
Page 30

Page 31

Report Date December 2024 (Corporate Committee 28/01/2025)
BRAGG Status - KEY BLACK -
Complete RED - Concern AMBER - Caution GREEN On Target GREY - Not
Started
Overall Schedule % Complete
GREEN 67%
Schedule Complete
Complete 100%
Project Titles: Lead Schedule Start Date End Date % Complete
Undertake a 6-month review of
the impact of training, AMcE Complete 01/07/24 31/10/24 100%
Schedule Complete
AMBER 80%
Project Titles: Lead Schedule Start Date End Date % Complete
i. Review effectiveness of
monitoring and scrutiny for
Health and Social Care Moray
(HSCM) established at Council
24/01/24.
JP GREEN 01/08/24 31/01/25 50%
Links to recent
Council Committee
report from the IJB
and also briefings
from the CSWO
Link to most recent
Full Council report in
04/12/2024 Item 7)
ii. Develop arrangements for
additional assurance, in
particular on financial
management.
LP GREEN 01/08/24 31/01/25 80%
iii. Ensure effective ongoing
partnership and collaborative
working arrangements for
Council/Moray Integrated Joint
Board (MIJB) management/
leadership.
JP JWM GREEN 01/08/24 31/01/25 75%
Dec 2024:  Regular review meetings with MIJB CFO have now resumed. This included a
review of the estimated actual for 24/25. Access to confidential MIJB reports has also
been provided to s95 and DCE who are now consultees on key financial reports for MIJB. 
MIJB oversight of the recovery plan is through the Budget Savings Oversight Group and
any issues arising between meetings are fed back to s95 by MIJB CFO
Regular review meetings with MIJB CFO.
Dec 2024:  Agreed that updated papers will be provided as far as
possible for all joint meetings to support greater scrutiny of ongoing
budget monitoring and progress with the Recovery Plan, together with
action logs.  Meetings to be programmed 8 weekly.
Review estimated actual.
Dec 2024:  Meeting has also taken place between TMC and the Chair and Executive Team
from NHS Grampian in relation to financial pressures and plans for 2025/26.
Regular meetings are in place with the Chief Executives of TMC and  NHS Grampian as
partners with the Chief Officer to the MIJB and the Chief Officer is a member of both the
Council and NHS Executive Leadership Teams.  Regular meetings also in place in relation
to the budget and budget setting process with finance teams across TMC and NHSG.  The
Chief Officer and Senior Management Team meet on a weekly basis with the IJB Chair
and Vice Chair and also reports regularly into both TMC and the NHS Grampian Board.
Dec 2024:  As per previous
Meetings in place and reporting into Council in relation to statutory
delivery as above.
.
Hyperlink to document
Hyperlink to document
Risks are that there is insufficient awareness of the
operational delivery of social care services which are the
statutory responsibility of the council as one of the
partners to the integration scheme.
Risks are (a) dynamic environment with changing patterns
of need but a general upwards trajectory  from ageing
population and increased high costs packages and (b)
most recovery plan actions are cost reduction rather  than
budget savings so methodology for monitoring different
from standard practice in council
DELIVERY DATE: Jan 25
Dec 2024:  Report to full Council on matters relating to the HSCP is ongoing and report
now includes the regular Chief Officer report to the IJB in addition to the most recent
minutes of the IJB meeting.  Work being undertaken to continue to adapt and develop
this to reflect services delegated by the Moray Council.
HSCM provides a regular report to Full Council in relation to the activities and
operational performance of those services delegated by TMC for which they remain
statutorily responsible.  The report aims to provide information on those services as well
as inform TMC on the strategic decisions being made by the MIJB.  The effectiveness of
this will be considered over the course of the calendar year through ongoing
engagement with elected members and the Corporate Management Team.
Dec 2024:  As above - reporting has been developed to include the Chief
Officer's report with intent to develop this further to include key
performance information in the first three months of the new year.
Regular reporting through Council in place with most recent report
discussed at Council on 13/08/24.  Ongoing consideration of report
formal and inclusion of matters relating to the council's statutory duties. 
Regular reporting and briefing by the Chief Social Work Officer in this
period in relation to current Joint Adult Support and Protection follow
up inspection.
Issue is to ensure positive strategic and operational
relationships across the partnership and that there are
appropriate forums to discuss risks, pressures and actions
required
Can share link to September NHS Board
meeting on IJB report and also most
recent Full Council IJB report from
December.
Summary:
The 6 month review of scrutiny training is not yet due. Under the Risk Management project, the annual review of departmental risk registers that feed wider risks into Corporate Risk Register is complete as is the work on the corporate overview of business continuity and resilience which was reported to committee in April 2024.Work on business continuity is
progressing as planned. 
Work on digital resilience is progressing with the first stage of the Board level desktop exercise completed and preparation for the next phase of workforce training and awareness in the final stages of preparation.
DELIVERY DATE: Oct 24
Progress Update Next Steps
Dec 2024: Survey completed in October 2024 identified that members of the committee
were generally satisfied with training received, were clear around the role of the
committee and recognised the benefits of a rolling training schedule for AS ctee
members.
Further training on scrutiny tools to be undertaken and survey issued 02 October to
members of Audit and Scrutiny to reflect on value of training in relation to their role,
determine how well equipped they feel with the role and on any changes to committee
remit they think are appropriate.
Dec 2024:  Training for AS members  built into the regular meetings with
the Chair.
2.2 Sound Governance PRIORITY 1
2. Governance and Accountability
2.1 Effective Scrutiny PRIORITY 3Lead: HoGSP
Lead: CEx
Issues, Risks, Changes (I/R/C)
Issues, Risks, Changes (I/R/C)
Progress Update Next Steps
Page 31

Page 32

Schedule Complete
AMBER 73%
Project Titles: Lead Schedule Start Date End Date % Complete
i. Risk management is
undertaken. AMcE Complete 28/03/24 30/04/24 100%
ii. Corporate overview of
business continuity and
resilience.
AMcE Complete 28/03/24 30/04/24 100%
iii. Business Continuity Plans to
be in place for all critical services. AMcE AMBER 28/03/24 31/03/25 40%
iv. *Business impact assessments
(resilience) completed for all
services.
AMcE AMBER 28/03/24 31/03/25 50%
Schedule Complete
AMBER 15%
Project Titles: Lead Schedule Start Date End Date % Complete
i Complete implementation of
Cyber Resilience Plan. FG AMBER 28/03/24 ? 20%
ii Complete Business Continuity
Plans/work for corporate and
service cyber resilience.
FG AMBER 28/03/24 ? 10%
Lead: HoGSP
Dec 2024:  Resourcing option delayed due to time required on other critical demands i.e.
Education connectivity issues and cyber threats.
05-11-24 First stage of desktop exercise undertaken at Board level on 03-10-24. 
Resourcing option to create capacity identified, change management exercise being
planned.
Progress made on cyber awareness training, arrangements for desktop exercise for CMT-
SMT for cyber incident response, deployment of fixes for live threats as notified by
CRU/NCSC.
Dec 2024:  HoS to progress resourcing plan.
05-11-24 Change management plan and delegated authority report to
be drafted.   Timescales in plan to be reviewed with respect to
anticipated implementation of creation of resource..  
Timescales in plan to be defined more clearly, resource to be addressed
to create capacity required to ensure completion within timeframe.
Dec 2024:  Not progressed due to demands previously above.
05-11-24  Work progressing, further information being considered by service. 
Initial review of previous BC plan begun.
Dec 2024:  HoS to progress review of BC plan.
05-11-24 BC plan to be reviewed with first draft to be completed Oct 25,
confirm feasible timescale, should progress with additional resource
noted above.
Business Impact Assessments are a precursor to development of business continuity
plans and the constraints outlined above apply equally here. Risk Management reviews
are identifying business impacts  as a consequence of wider challenges all councils are
facing, these challenges are difficult to fully mitigate against in a period of rapid change.
As above
2.4 Digital Resilience Management PRIORITY E
Progress Update Next Steps
DELIVERY DATE: ?Lead: H HR,ICT & OD
This work continues with services committed to maintaining business continuity while in
some cases finding it challenging to create capacity to update formal plans. This
particularly where day to day business decisions are essentially focused on continuity,
where in house resources are constrained and innovative solutions are required to
maintain service delivery. 
A review is being undertaken of the scope and coverage of plans in the
current operating environment. This will ensure those which add most
value continue to be prioritised, it being recognised in progressing this
work that some services are experiencing unmet need or are meeting
that need only through securing external support. The target delivery
date for critical services was 31 March 2025, this target may need to be
extended and is dependent on service priorities.
2.3 Risk Management PRIORITY E DELIVERY DATE: April 24 /  25*
Lack of capacity for service manager and Information
Security Officer to properly address.
Issues, Risks, Changes (I/R/C) Hyperlink to document
The imperative is to match available resources to agreed
corporate and service plans that deliver optimum services
and secure best value. As this becomes more challenging,
decisions on business continuity are applied on a daily
basis as scarce resources are assigned to priority need.
With limited capacity or resource to invest in business
continuity  the updating of formal plans is lower priority
and this position is unlikely to change in the current
financial climate.
Issues, Risks, Changes (I/R/C) Hyperlink to document
A summary outline of the challenges to progress has been
provided to senior management in a 3 minute briefing
report.
Risk that volume of work arising through threat
exploration and fixing detracts from progress through
actions.   
FG report on capacity to be drafted.
Progress Update Next Steps
Annual review of departmental risk registers feed wider risks into Corporate Risk
Register
Moved to  quarterly review of Corporate Risk Register.
Strategies approved in April 24
Page 32

Page 33

Report Date December 2024 (Corporate Committee 28/01/2025)
BRAGG Status - KEY BLACK -
Complete RED - Concern AMBER - Caution GREEN On
Target
GREY - Not
Started
Overall Schedule % Complete
GREEN 82%
Schedule Complete
GREEN 55%
Project Titles: Lead Schedule Start Date End Date % Complete
i. Stage 1: Refresh and refocus - new
developing transformation strategy agreed,
financial projects, new areas and acceleration /
expansion (May 24).
DW Complete 28/03/24 30/04/24 100%
ii. Stage 2: Further develop and define strategy,
specifying projects and savings (Aug 24). DW Complete 28/03/24 30/08/24 100%
Council report
13/8/2024
Transformation
Strategy (item 6a)
iii. Stage 3: Future council programme (normal
business). DW GREEN 01/08/24 28/08/26 20%
Smarter working
phase 2 update
report to council
4/12/2024 (item 19)
Libraries report
council 22/10/2024
(item 10 -
confidential)
Review of OOH
report 22/10/2024
council (Item 12 -
confidential)
Corp cttee update
on 5/11/2024 (item
16)
Accts comm
overview report
iv. Establish corporate oversight to ensure
pace, prioritisation, new opportunities, ongoing
development and delivery of benefits.
DW GREEN 01/08/24 30/01/26 25%
v. Build in engagement with communities and
staff about the need for change and impact any
mitigation of proposed changes.
DW GREEN 01/08/24 30/01/26 30%
Schedule Complete
Complete 100%
Project Titles: Lead Schedule Start Date End Date % Complete
Workforce Working Group established DW Complete 28/03/24 27/09/24 100%
I. Improve use of workforce data in ensuring
effective workforce planning. FG Complete 28/03/24 27/09/24 100%
Transformation Strategy
Appendix 1 – Strategy and Projects
Appendix 2 – Design Principles
3. Effective Use of Resources
DELIVERY DATE: Aug 26
DELIVERY DATE: Sept 24
05-11-24: Report to council in August noted progress and new projects for progress.  Member workshop on 21-
08 used to inform next iteration of programme of work, including direction for leisure, libraries and learning
estate.  Work continues to develop areas identified and out of hours, learning estate acceleration and
workforce terms and conditions projects are all advancing to be reported to the council by January 2025
Projects mandates have been developed for new projects to assess merits and progress continues on active
projects.  Workshop on 3/7 to explore potential of  digital and outcomes being considered for future.  
Report to Council 13/8 on progress
Dec 2024:  Further work has been completed to confirm projects for inclusion in programme and continue the
development of existing projects with update for Smarter Working Phase 2 reported to council on 4/12 and
the Out of Hours project approved at Corporate Committee on 22/10 and the r Libraries, Learning Centres and
Heritage service redesign approved for consultation on 22/10         
05-11-24 - work is continuing to develop and define projects and to ensure projects ae specified to clarify the
savings that can be expected.  A number of projects are nearing reporting stage and will be included in the
update scheduled for January 2025.
Review of aim, vision and design principles                                                   
Confirm projects for inclusion in programme: reporting on Leisure,
Workforce, Learning Estate, Customer Contact service and Pool cars as
part of next iteration of transformation strategy                                      
Identify future developments and direction
The new Transformation Strategy and programme of projects was agreed by the Council on 24 April 2024. 
This included a refresh of the strategy and refocus on projects to ensure that they were aligned.  New projects
and opportunities were also identified for development.
Workforce Working Group 23/04/2024 (item 12)
Dec 2024:  Power BI expanded further and circulated to all 3rd tier managers.  Planned work is completed
although further improvements will continue to be worked on.
05-11-24 Work progressing to ensure full suite of data available for annual WFP discussions which are due
Nov 24/Jan 25.
Power BI developed and circulated to managers.
Dec 2024:  Plan with actions, milestones, timescales to be finalised. 
Data Protection issues to be resolved.
05-11-24 Refreshed approach to discussions with HoS and DMTs to
ensure full engagement and participation in identifying issues and
actions required to increase effectiveness.
Further elements of data to be included, schedule of HR metrics refresh
to be reviewed per 2024 Workforce Audit actions.
05-11-24: WFWG reviewed and supported the revise workforce strategy and plan which was approved by the
Corporate Committee on 27-08-24                                                                                
Agreed the draft terms of reference             
Workforce Working Group established and due to meet for 3rd time on 15/8.
WFWG to be asked to consider Terms and Conditions proposals
associated with financial planning as new area of work
Dec 2024:   Council approved library proposals for consultation on 22/10.  Public and workforce
communications were issued per stage 2 of the engagement strategy and a survey issued to facilitate
responses. Over 200 responses were received to the Library survey and these have been analysed and will be
reported to the council in the new year.  The Council also approved savings on 4 December 2024, however,
there are limited specific requirements for public consultation on these.
05-11-24 - implementation of agreed council financial engagement strategy underway to ensure awareness of
the need for change and to ensure influence in proposed changes. 
Jan 2025 - report to council on feedback from library consultation                                                                                   
Feb 2025 - Leisure engagement to follow on from council decision re the
future service
3.2 Workforce Planning Lead: Cex PRIORITY 2
Summary: 
The refresh and refocus of the Transformation Strategy is complete and was approved by the Council in April 2024.
Further updates were presented to the Council in August 2024, with further definition of the strategy and including development of new projects and in October and November with a new project agreed by Council on 22/10 and an update to corporate committee on 5/11. Work is also well progressed on developing planned projects which following a member workshop are nearing readiness for reporting and progress  continues on active projects. On
workforce, the workforce working group has completed its planned work to update workforce strategy and this was reported in August.
The 10 year capital plan has been reviewed by officers under the Financial Management project with the cap mechanism agreed in October 2024 and the review having progressed in November/December for reporting in January 2025.  The Revised Short to Medium Term Financial Strategy is complete and was reported to Council on 26 June 2024. The medium to long term financial plan was reported to Council on 4 December.   Revenue estimated
actuals reported in December and corrective action planned.   Significant strategic service reviews completed. Further work is underway for the remaining actions and to continue to develop the short to medium term financial position taking account of the budget settlement.  
Corporate Workforce Strategy and Plan agreed at Corporate Committee on 27 August and is now being implemented as part of normal HR-OD work.
3.1 Transformation and Sustainable Services Lead: CEx / DCE (ECOD) PRIORITY 1
Progress Update Next Steps
Issues, Risks, Changes (I/R/C) Hyperlink to document
Dec 2024:  ECMT have reviewed and supported new mandates for projects on the replacement of Care First
and the use of Pool Cars.  Further work is being completed to enable these to move to the next stage and be
reported to committee/MIJB as appropriate.  Review of the operation of the Transform programme boards
has been identified for action early in 2025.
05-11-24 - quarterly reporting to CMT and Corporate committee established to ensure oversight, prioritisation
and pace
Feb 2025 Review of Transform Boards
Issues, Risks, Changes (I/R/C) Hyperlink to document
Resources will require to be considered to ensure
and enable progress.                                                     
Transformation makes a medium to long term
change, risk focus on short term places risk on
longer term results   Challenge that expectation
of high financial return may not be achievable
Governance becomes less effective because it is
more onerous than can be supported by the
current arrangements - review of Boards aims to
mitigate this
Low engagement, especially on general issues
and financial planning.  Public fatigue from
volume and frequency.  Mitigation of improved
tools and wider approaches being considered
Progress Update Next Steps
Page 33

Page 34

ii. Update Workforce Plan to reflect new
models of service delivery and ways of
working, including how the Council is:
• Identifying and addressing skills gaps, at
operational and leadership levels.
• Making best use of existing workforce by
collaborating with partners to overcome
recruitment challenges.
FG Complete 28/03/24 27/09/24 100%
iii. Develop actions to support workforce
culture aligned to Transformation Strategy and
to support the issues identified from employee
survey results.
FG Complete 28/03/24 27/09/24 100%
Schedule Complete
GREEN 91%
Project Titles: Lead Schedule Start Date End Date % Complete
i. The Council will keep the affordability of its
capital plan and related revenue implications
under review,
LP Complete 01/07/24 Fri 27/09/24 100% Report to Council January 2025 Capital Strategy
04/12/2024
Corporate Asset
Mgmt Plan
04/12/2024
including review of the Capital Strategy and
Corporate Asset Management Plan.
LP Complete 01/07/24 Fri 27/09/24 100%
ii. The Council will strengthen monitoring of the
delivery of the Capital Plan and take action to
address any slippage. Ongoing quarterly
LP GREEN 01/07/24 30/06/25 30%
Officers use only:
Guidance for
Budget Monitoring
to Committee
Capital Plan
2024/2025
04/12/2024
iii. The Council will review its Asset
Management Strategy to ensure optimum
arrangements are in place and the property
portfolio is reduced wherever possible. Phase 1
01/09/2024
DW Complete 01/08/24 Fri 27/09/24 100%
iv. The Council will review its forecasting
process to ensure the most accurate
projections. Dec 24
LP GREEN 01/08/24 31/12/24 90%
v. The Council will review its Reserves Policy to
ensure alignment with financial planning
including investment in Transformation. Sept
24
LP Complete 01/07/24 Fri 27/09/24 100%
Financial Reserves
Policy 25/09/2024
(item 8)
vi. The Council will review its Short to Medium
Term Financial Strategy. Jun 24 LP Complete 28/03/24 Fri 28/06/24 100%
vii. The Council will review its Medium to Long
Term Financial Strategy. Oct 24 LP Complete 01/08/24 31/10/24 100%
DELIVERY DATE: Dec 24
Need for further ear-marked reserves identified and implemented for 2023/24.  Metrics for assessing risk for
free general reserve updated and reported to Council September 2024.Level of free general reserves
approved.
Revised Short to Medium Term Financial Strategy reported to Council on 26 June 2024
Dec 2024:  Reported to Council 4 December 2024
Review almost complete, bar update on capital
Dec 2024:  Complete - no further action planned unless significant
change in circumstances
Update to reflect position re capital plan and finalise covering report.
Dec 2024:  Prior to entering new structure to fms, discussed at Finance Development Group to scope ICT
support needed.  Significant slippage reported at project level, moderated at programme level for report to
Council.   Monitoring report guidance issues to budget managers 
Outline project plan for improved capital monitoring to budget managers developed.  No further development
as resource directed towards annual audit
Dec 2024:  Pilot budget  profile for major projects in a project
management style analysis of project phases
Restructure capital on fms.  Trial revised budget monitoring statements
with budget managers - awaiting structure input following discussion
with ICT and this will be a lengthy task, prep work done
Dec 2024: Detailed forecast of centrally held provisions.  Corrective action identified by services re projected
overspend.  Capital plan spend forecast used programme level risk based modification of individual budget
managers line by line forecast
Reviewed last year's actual to estimated actuals to identify if there are any clear problem areas.  Main issue is
around accurate forecasting of central contingency
Dec 2024:  Complete review of loans pool spreadsheet,  Set up template
for capturing use of ear-marked reserves
Calculate estimated actuals and incorporate risk factor
Progress Update Next Steps
Review commenced May 2024, looking at approach to applying cap on capital expenditure.  Recommended
approach developed during September and  reported to Council on 22 October 2024.  Following Council
decision the Capital Strategy and CAMP has been updated to incorporate the agreed approach and approved
by Council.  
N/A - complete
05-11-24 Sept date was noted as first stage of review.        
Phase 1 complete                
Beyond that, further work has progressed to develop a longer term sustainable asset base. Project on
rationalisation of learning estate considered at members workshop in Aug 24.  ECLS committee on 17/9
agreed to establishes a working group to consider further and first meeting has been scheduled for 24/10.  
Learning estate is a significant council asset and will have a considerable impact on the capital plan and has
been prioritised for that reason, however, the challenges will be significant.                                                                                             
Work is also under development in relation to the Leisure Estate, including MLC where buildings are also at
risk of failure and not being fit for the future.  An update report was provided to the council in October re
MLC and the work commissioned on the future of leisure services is due to report in October following which
a holistic report will come forward to the council, likely early 2025 due to complexities      
Review planned to commence after the Council recess (overarching status of LES, Leisure, smarter working etc
reviews)
Report on learning estate targeted for early 2025                           Report
on leisure estate targeted for early 2025
Capping mechanism for capital plan approved October 2024.  10 year plan updated during November and
officer review in December.  Cap applied.  Loans pool estimates updated for current rate of interest for
affordability PI
05-11-24 Revised Workforce Strategy and Plan  agreed at Corporate Committee on 28-08-24.
Workforce Strategy and Plan updated with revised draft incorporating feedback and actions from the
Workforce Working Group.
05-11-24 Planned work now business as usual across HR and OD teams
and monitored through normal performance management framework.
Workforce Strategy and Plan scheduled for Corporate Committee on
27/8/2024.
05-11-24 Planned work now business as usual across HR and OD teams
and monitored through normal performance management framework.
Workforce Strategy and Plan scheduled for Corporate Committee on
27/8/2024.
3.3 Financial Management Lead: Cex / DCE (EEF) / CFO PRIORITY 1
05-11-24 Revised Workforce Strategy and Plan agreed at Corporate Committee on 28-08-24.
Actions to support issues identified from employee survey results are included in the workforce strategy and
plan, specifically developing the workforce to be prepared for change as well as actions for broad cross cutting
themes e.g. Communication.   
Issues, Risks, Changes (I/R/C) Hyperlink to document
Learning estate - high risk. Risks of acceptability
of approach, national policy and community
reaction               Affordability major risk and
condition of buildings and ongoing viability
Page 34

Page 35

viii. The Council will develop a Savings Plan for
the short to medium term. Aug 24 LP Complete 28/03/24 Fri 30/08/24 100%
High level savings options identified at budget workshop on 19 June 2024.  Updated Savings Plan developed in
August and approved by Council Sept 2024
Page 35

Page 36

Report Date December 2024 (Corporate Committee 28/01/2025)
BRAGG Status - KEY BLACK -
Complete RED - Concern AMBER - Caution GREEN On Target GREY - Not
Started
Overall Schedule % Complete
GREEN 26%
Lead: DCE (EEF / ECOD) Schedule Complete
AMBER 26%
Project Titles: Lead Schedule Start Date End Date % Complete
i. Work with Community Planning
Partners (CPP) to develop shared
priorities for incorporation into Local
Outcome Improvement Plan (LOIP).
DW GREEN 28/03/24 30/10/25 30%
ii. Investigate and develop potential
single Moray Plan. DW AMBER 28/03/24 30/10/25 12%
iii. Identify opportunities to maximise
the impact of resources and budgets
through alignment of activity. 2 Oct 25
CEx / DCE (ECOD) BV CRITERIA Ref
Best Value Improvement Outcome
Proposed Action E= existing 1 = High
Priority Date Delivery Lead CMT/SMT
DW AMBER 28/03/24 30/10/25 10%
iv. Continue development and delivery
of Locality Plans, involving service
users and local communities in the
design of services.
DW GREEN 28/03/24 30/10/25 50%
4. Partnerships and Collaborative Working
Summary: Work with community planning partners is moving forward to develop shared priorities for the LOIP and there is early indicative support to develop a single Moray plan.  Locality plans are well developed and ongoing and consideration is now planned of learning across partners and service areas to identify opportunities for learning and greater impact from partners
working more closely.  There has been limited progress for Nov/Dec due to other priorities, however, work continues on building on the positive work within the partnership in the approach to locality working.  Discussions are also taking place between partners on options to dedicate resources to partnership work to enable more focussed action on Partnership Working for
Moray in 2025 and it is hoped this will assist in taking forward planned developments.
4.1 Partnership Working for Moray PRIORITY 2 DELIVERY DATE: Oct 25 Issues, Risks, Changes (I/R/C) Hyperlink to document
Progress Update Next Steps
Dec 2024:  The most recent development session on 24/10 considered opportunities to
further develop community engagement in the delivery of priorities.
Development sessions been held with community planning partners to consider priorities and
how can take forward collectively.  Agreement reached on focus and main priorities for LOIP.
This will inform the updating of the LOIP and development of approach to delivery
Summary of what other councils do to be written up. Pace and consistency of progress are at risk
as no specific resource to develop this work.
CP partners to consider how to address this,
however, to date it has not been possible to
identify budget due to financial pressures
Dec 2024:  It has not been possible to make progress in the weeks since the last update due
to focus on preparing council budget. However, there has been work to identify partner
resources to support this action and it is hoped this can be advanced in the first quarter of
2025.
05-11-24: Research completed of other councils established that 2 have single plans (noted
below).  Discussion taken place with Improvement Service for support on this area.  Potential
for IS to undertake element of work if funded.                                                                          This
has been raised at the development sessions with the CP Board and there has been general
support for the approach.  To be considered further as the LOIP is re-developed.  Currently 2
of 13 family group authorities have a single plan, Midlothian and Fife. Clackmannanshire also
have a variation which is being looked at.
Summary of what other councils do to be written up. There is no resource against this work and
so pace is likely to vary based on when
capacity can be released from other tasks
Dec 2024:   It has not been possible to make progress in the weeks since the last update due
to focus on preparing council budget. However, there has been work to identify partner
resources to support this action and it is hoped this can be advanced in the first quarter of
2025
05-11-24: meeting taken place with partners re locality work.  Identified scope for
development and this will be taken forward                                                                Small
development group has discussed approach based on output from development sessions. 
Work to take place with partner reps involved in locality work to identify opportunities
There is no resource against this work and
so pace is likely to vary based on when
capacity can be released from other tasks
Dec 2024:  Work continues with the working group to consider the CPP approach to locality
work and it is planned to report progress to the CPB in the first half of 2025.
05-11-24 - the CPP development session on 24/10 will include consideration of the findings
from the SCDC work below relating to localities work and the outcome of this will  be used to
contribute to the self-evaluation that the CPP will be carrying out as part of the national
programme being led by the Improvement Services.                                                                                                            
Work has also begun in September with CP  partner  Locality  specialists  to identify way
forward and further work will be progressed for inclusion in the future approach to the LOIP
and potential One Moray plan         
Practice in this area is well developed and ongoing.  Consideration is now planned of learning
across partners and service areas to identify opportunities for learning and greater impact
from partners working more closely
June 25 - report to CPB on proposal for the development of locality
working aligned to CPB priorities
There is no resource against this work and
so pace is likely to vary based on when
capacity can be released from other tasks
Page 36

Page 37

Report Date December 2024 (Corporate Committee 28/01/2025)
BRAGG Status - KEY BLACK - Complete RED - Concern AMBER - Caution GREEN
On Target GREY - Not Started
Overall Schedule % Complete
GREEN 48%
Lead: Schedule Complete
DCE (EEF / ECOD) GREEN 48%
Project Titles: Lead Schedule Start Date End Date % Complete
i. Progress arrangements to mainstream
Participatory Budgeting (PB)– develop
guidance for services and establish skills
development approach.
RG LP GREEN 28/03/24 30/06/25 75%
ii. Continue to build on approach to date of
involving communities across its financial
planning and service/policy change
processes and undertake reviews as
applicable.
DW GREEN 28/03/24 30/06/25 50%
iii. Engage key stakeholders (e.g.
Community Engagement Group,
Community Councils) on progress and
feedback for PB approaches and local
priorities.
DW GREEN 28/03/24 30/06/25 35%
iv. Deliver specific traditional PB exercises
for appropriate funding. RG LP GREEN 28/03/24 30/06/25 75%
v. Develop approaches to wider PB i.e.
participatory democracy. DW GREEN 01/08/24 30/06/25 5%
Progress Update Next Steps
Dec 2024:  capturing current activity to establish areas to build on
05-11-24: public engagement planned under the engagement strategy approved by the council on 17-09 is
using PB principles in the design of the engagement work to enable community influence on council budget. 
Event planned for November 2024 will incorporate as well as opinion survey
Dec 2024:  agree areas to build on
Public event in November to enable community influence in council financial
planning decisions                                                                            
Dec 2024:  Drafted list of current activity and identified further areas to progress, circulated to Heads of
Service
Guide to mainstream PB developed by CSU and circulated to all services.  Commenced discussions with Heads
of Service about capturing current activity
Dec 2024:  arrange meeting to discuss with budget managers following feedback
from Heads of Service
Dec 2024: Engagement to take place with public and workforce over October (information) and November
(engagement) to enable influence on council financial planning linked to priorities:                 
> Teamtalk dialogue to be cascaded (Oct - Nov)                                       
> Public information issued (Nov)     
> Public/staff survey open on general financial planning (Nov/Dec) 
> Public engagement session planned for Nov was postponed due to low take up and feedback that more
specific topics would be of more interest.  Plan to re-organise when specific topics are agreed by the council
for discussion.
> Specific consultation and engagement on libraries proposal took place (Nov)    
05-11-24: Council engagement strategy agreed at Council on 25-09-24 to take forward engagement on
priorities and financial planning. Delivery plan for strategy also approved and planning in place to begin
delivery in October. Workforce engagement plans discussed with trade unions at TU/Officer meeting and JCC
(18/09/24) to build on previous experience and develop next engagement in light of that.  Teamtalk dialogue
approach to be used across workforce with parallel engagement to community work on council priorities and
financial planning run in October.                                                                                 
Bid submitted for engagement tool to enhance options and capacity for engagement. 
Report back to council on public engagement (Jan)                                                               
Continue development of sourcing online tool (once budget secured)
Dec 2024:  CPP considered feedback from report outcomes of engagement review work at October
development session (24/10) and identified opportunities to develop                    Further work on locality
partnership working to inform future Loip (Mar 2025).  It is planned to advance this in the new year.
Work has also begun in September with CP  partner  Locality  specialists  to identify way forward and further
work will be progressed for inclusion in the future approach to the LOIP and potential One Moray plan    Work
has been completed to review the operation of the Community Engagement Group (CEG) and reported back at
the CEG meeting on the 16th July.    
This work was carried out to engage CEG members about the purpose/format of the proposed event and also
to get feedback on the role of the CEG itself.
Further work on locality partnership working to inform future Loip (Mar 2025)
June 25 - report to CPB on proposal for the development of locality working
aligned to CPB priorities
5. Working With Communities
Issues, Risks, Changes (I/R/C) Hyperlink to document
Summary:  Guide to mainstream PB developed by CSU and circulated to all services.  Consideration is being given to the use of online tools and website enhancement to support engagement.  Work to review the operation of the Community Engagement Group has been completed and considered by the Group and was considered at the CPB development session in October 2024 where future approaches
were identified.  These are being taken into account in the proposals being developed for the CPB for the development of locality working. £109,000 via UK shared prosperity fund was allocated via PB to eligible arts, culture and heritage groups (July 24).  Progress is being made in mainstreaming PB principles into the council's approach to financial planning.  Event scheduled for November 2024 as part of
engagement work to encourage community influence was cancelled due to low sign up.  Consideration is being given to how best to address this for future.
Draft list of current PB type activity circulated to Heads of Service and will be used to guide future activity.
Dec 2024:  One further appropriate funding identified to date and Head of Service asked to consider PB
approach
£109K via UK shared prosperity fund allocated via PB to eligible arts, culture and heritage groups (July 24)
Dec 2024:  discuss if funding can be used for PB within SG time constraints
5.1 Community Budget Engagement ensuring local communities are more in Participatory Budgeting DELIVERY DATE: Jun 25PRIORITY 2
Page 37

Page 38

Report Date December 2024 (Corporate Committee 28/01/2025)
BRAGG Status - KEY BLACK -
Complete RED - Concern AMBER - Caution GREEN
On Target
GREY - Not
Started
Overall Schedule % Complete
GREEN 55%
Schedule Complete
GREEN 55%
Project Titles: Lead Schedule Start Date End Date % Complete
Develop a Sustainability Statement
that draws together the range of work
the Council has in place to deliver
sustainability.
RG Complete 28/03/24 27/09/24 100%
Identify any gaps that require
consideration and action. RG GREEN 28/03/24 31.12.25 10%
Climate Change
Overview  - CPB
03/12/2024 (item 2)
Climate Change
Strategy / updated
Routemap to Net
Zero - FC 4/12/2024
(item 15)
Hyperlink to document
Summary: Progress has been made in mapping the Council Corporate strategies relevant to sustainable development against National Performance Indicators and corporate priorities; identify areas of focus 2024-2029, SD changes expected and PIs to monitor progress; finalise draft principles. It is planned to bring this forward for wider
consultation and involvement on the sustainability statement.
Dec 2024: The Statement was agreed at committee on 4.11.24. This included a small number of actions for completion by the end of 2025. As the action plan is now agreed, the end date for actions has been adjusted to December 2025 with progress on these ongoing including a report to council on 4.12 and a paper to the next meeting
of the Community Planning Board on 3.12.24 on collective action on sustainable development and climate change.
Sustainable Development Framework
05/11/2024 (item 15)
6. Sustainable Development
DELIVERY DATE: Sep 246.1 Sustainable Development PRIORITY 3Lead: DCE (EEF)
Progress Update Next Steps
Dec 2024:  Statement approved at committee on 4.11.24.
05-11-24: Draft Statement framed, reviewed via SLF and a group of
interested members with final review at SLF 30.9.24; next step is
reporting to Corporate Committee on 4.11.24
Dec 2024:  Statement complete, close action.
Map TMC Corporate strategies relevant to sustainable development 
against National Performance Indicators and corporate priorities;
identify areas of focus 2024-2029, SD changes expected and PIs to
monitor progress; finalise draft principles.
Dec 2024:  Work has begun on the actions set out in the Statement
with the end date for this action adjusted to reflect the  agreed
action plan timings.
05-11-24: Action Plan created and part of Statement; will address
current gaps pending wider review as part of Climate Strategy
review.
Dec 2024:  Work has begun on the review of the Summary of
Implications in reports in light of the Statement and actions linked to
the Climate Change Strategy review have begun with a paper to
council on 4.12 and a report to the Community Planning Board on
3.12.24.
Socialise Statement and proposed actions with officers and members
for review;  programme future action on Climate Strategy and any
resultant changes.
Issues, Risks, Changes (I/R/C)
Page 38

Page 39

Report Date December 2024 (Corporate Committee 28/01/2025)
BRAGG Status - KEY BLACK - Complete RED - Concern AMBER - Caution GREEN On Target GREY - Not
Started
Overall Schedule % Complete
GREEN 97%
Schedule Complete
GREEN 97%
Project Titles: Lead Schedule Start Date End Date % Complete
i. Equality and socio-economic duty
addressed in our Corporate Plan and
Local Outcome Improvement Plan
(LOIP).
AMcE Complete 28/03/24 19/07/24 100%
ii. Integrated Impact Assessments (IIAs)
carried out for strategic decisions and
budget decisions.
AMcE Complete 28/03/24 19/07/24 100%
iii. Equality and socio-economic impact
considered in every committee decision. AMcE Complete 28/03/24 19/07/24 100%
iv. Equality outcomes are set and
reviewed. AMcE Complete 28/03/24 19/07/24 100%
v. Views of equality groups sought
during consultation. AMcE Complete 28/03/24 19/07/24 100%
vi. Staff are trained in equalities and the
Council equalities as an employer. FG GREEN 28/03/24 ? 80%
Now to include children's rights under UNCRC Continue current practice
Dec 2024:  Sponsored eLearning proposal sets out planned
approach to mandatory e-Learning including equalities.
05-11-24 Further work undertaken responding to feedback.  
Equalities training is in place through a section on the Moray
Management Methods training and there is an Equalities and
Diversity eLearning module.
Dec 2024: CMT sign off
In summary section of reports Continue current practice
Monitored and reported to committee. Need reviewed in 2025
Continue current practice
Continue current practice
DELIVERY DATE: Normal
business
7. Fairness & Equality
Issues, Risks, Changes (I/R/C) Hyperlink to document
Summary:  This workstream is well advanced and the planned actions are complete for: equality and socio-economic duty actions and consideration of these within committee reports; Integrated Impact Assessments were carried out on budget proposals and the views of equality groups were sought where appropriate. The remaining action
is for staff training on equalities and the council equalities as an employer and this is underway and on target. 
Dec 2024: Further refinement of the paper on sponsored eLearning has been carried out and is with DCE prior to going to CMT for final sign off.
7.1 Equalities Action PRIORITY 2Lead: HoGSP
Progress Update Next Steps
Page 39

Page 40

Page 40

Page 41

REPORT TO: CORPORATE COMMITTEE ON 28 JANUARY 2025 
SUBJECT: ICT STRATEGY AND PLAN 2025-2028 AND DIGITAL UPDATE 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform Committee of the progress made against the current ICT and Digital
Strategy and Plan and seek agreement of the updated ICT Strategy and Plan
for 2025-28;   
1.2 To ask Committee to approve the development the Digital Strategy as a
separate distinct area to be removed from the ICT Strategy at present and to
note that future budget may be required to enable progress on the definition of
opportunities for digital transformation. 
1.3 This report is submitted to Committee in terms of Section III (B) (34) of the
Council's Scheme of Administration relating to the development and
implementation of information technology policies. 
2. RECOMMENDATION 
2.1 It is recommended that Committee: 
(i) considers and notes the progress made against the 2023-24 ICT
Plan; 
(ii) agrees that in order to enable the development of future
opportunities for digital transformation, the ICT Strategy is set out
separately from the future focused Digital elements, which will
come forward to committee as part of planned Transformation
work; and 
(iii) approve the ICT Strategy 2025-2028 and 2025/6 Plan (APPENDIX 1) 
3. BACKGROUND 
3.1 The purpose of this report is twofold: firstly, to provide an update on planned
work within the current ICT and Digital Strategy and Plan and secondly,
recognising that the Council needs to accelerate the pace of its Digital
Transformation, the report also addresses how the Council can progress in
Item 8.
Page 41

Page 42

establishing its digital vision and ambition which to date has been constrained
by a lack of resource.  This report therefore will cover a progress update on
planned work during 2024/25, a proposed change to separate the ICT and
Digital elements of the strategy and sets out the steps required to enable the
Council to progress in establishing its digital vision and ambition including
identifying two or three key projects.   
Progress on 2023-2026 ICT & Digital Strategy and Plan
3.2 While work has progressed across most areas of planned work during
2024/25 (see APPENDIX 2), there are some main points to note.   The most
significant is the challenges that have been experienced in trying to ensure
that the ICT infrastructure provided in schools is fit for purpose.  Progress has
been made very recently and in addition to immediate remedial actions, longer
term improvement will be addressed through the roll out of the second
Scottish Wide Area Network programme (SWAN 2) which will provide greater
capacity in terms of bandwidth and upgraded infrastructure.  Securing a sound
and effective education ICT service is an essential service improvement going
forward to enable digital learning and teaching to support opportunities for all
pupils.   
3.3    The Council also aims to have an ICT infrastructure that supports and enables
improved collaborative working and appropriate information sharing including
expansion of opportunities available through the digital ‘front door’ to council
services that improve outcomes for the community.   
3.4      Cyber security and resilience continue to be key features.   Notifications of
potential threats all require investigation and potentially mitigatory and
remedial work.   
3.5      With the extraction of the Council’s Digital Transformation approach the ICT
Strategy priorities have been refined accordingly to cover: 
Supporting ICT Development – ensuring the ICT infrastructure supports the
expansion and enhancement of the use of digital technologies, identifying
inefficiencies, bottlenecks and areas for improvement, extending the
availability of online services to users. 
Business Intelligence and Insight – corporate data management strategy, data
quality, integration and sharing, analytics and monitoring of online systems
performance. 
Assurance – cyber security and resilience, information security, device
management and business continuity 
Forward Planning – identifying and planning the replacement of large
corporate business systems, the use of cloud computing, network and device
infrastructure management (e.g. Corporate and Education infrastructure,
telephony, server and application management) 
Progress on Digital Transformation 
3.6 The Council’s previous ICT and Digital Strategy and Plan set the direction and
work required to respond to, support and achieve the priorities of the Council
Page 42

Page 43

for both ICT and digital requirements.   Since then, focus has increased on the
opportunities for digital development across the Council to enable and
progress transformation to different ways of working to support a more
sustainable future council.  Initial scope for Digital advancement has been
identified through the Council’s first Digital Maturity Assessment report from
the Digital Office (Scotland) and an externally facilitated workshop of service
managers.  As noted in the Transformation Strategy agreed by the Council on
24 April 2024 (paragraph 9 of the minute refers) there is significant opportunity
to influence service design, delivery and ways of working through digital
approaches. This will extend beyond the role of the ICT service and technical
solutions and will require council wide ambition, leadership and drive.   
3.7 The Council is engaged with national digital work in areas including Digital
Health Care and Innovation Centre for the Care in Place Project, Microsoft
technology forums specifically aimed at Local Government currently looking at
Copilot, Power Data Platform and two new sub-groups on Data and Dynamics
365.  The Council participate in the work led by the national Digital Office to
participate in and monitor the direction of national development work to
ensure that the Council capitalises on areas that would be of relevance,
benefit and are achievable with regard to future innovation.  
3.8 The output from the digital workshop referred to earlier in the report identified
areas to improve efficiency and expand lean processes.  However this is
largely expansion of work that is already within the planned transformation
projects and that is happening in services.   To achieve a step change in
business, greater vision, ambition and direction and provide the catalyst for
innovation and digital transformation, more is needed.     
3.9 However, despite best efforts, digital discovery work to date has been
constrained as it has been undertaken within existing resources.  It is clear
that to identify and explore new, challenging and aspirational transformational
digital opportunities specific expertise and resources are required.   Building
on the learning from other project work such as smarter working and learning
estate, it is evident that where dedicated resources have been secured, this
has enabled projects to progress.  The challenge for digital innovation is
specifying what we don’t yet know and so demonstrating a business case for
investment. Therefore, the steps below suggest identifying where the council
can benefit from learning elsewhere and an investment in facilitated discovery
work in the expectation that there will be opportunities that can bring benefit if
resources are applied to early research and development, although the
benefits can’t be specified in detail at this point, because the research is
required.   
3.10  The proposed plan for taking the next stage of discovery forward is as follows: 
o Learning from others - to adopt best practice at pace and secure
impact for the Council.   This includes linking with national work and
using that as a springboard with external support to help define the
long-term vision and ambition.   
o Innovation and thought leadership - to open up and elevate thinking to
the art of the possible and act as a fire starter.  It is proposed funding is
Page 43

Page 44

approved that can be applied flexibly to identify opportunities for digital
transformation and help define the Council’s digital ambition and vision. 
It will be necessary to allocate budget for this and it is proposed that
proposals will be developed for an allocation from the transformation to
identify opportunities to advance digital work and reported to a future
meeting of this committee.   This would enable, for example, elements
of consultancy and project resource for any areas identified for specific
work. 
o Outcome – the planned outcome will be 2-fold: 
▪ identification of 2-3 key projects based on experience elsewhere
that could be translated at pace into Moray over a 9-12 month
period 
▪ specification of the Council’s Digital Transformation ambition
with an accompanying statement of high-level outcomes and
new ways of working that can be expected to contribute to a
sustainable future council. 
3.13 In conclusion, this report has provided an update on planned work under the
current ICT and Digital Strategy and plan, provided a revised ICT Strategy
(2025-2028) and 2025/26 Plan, proposed an approach to allow the Digital
development work to progress through use of external expertise, experience
and insight, allowing the Digital Transformation work as contained within the
Best Value Action Plan to progress. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The contents of this report are in accordance with the priorities set out in
the Corporate Plan and set out how to make best use of technological
resources to support the Council to meet current and future objectives
and challenges. 
(b) Policy and Legal
None. 
(c) Financial implications
There will be financial implications from the proposed development of
digital service opportunities.  These are not quantified at this time and
will be reported to a future meeting of this committee for consideration.   
There are no financial implications from the proposed ICT strategy and
plan.  However, the pace of technological development is rapid and
trends within the technological environment will be monitored for
emerging potential risk and impact e.g. the push from providers to move
to Cloud based services and reported to committee as necessary. 
The routine replacement of ICT devices and infrastructure is
accommodated within the council capital budget. As a result of increased
flexible working the requirements for routine device and infrastructure
Page 44

Page 45

maintenance may change and require to be maintained and replaced at
a faster rate than the previous desktop personal computer estate. 
Therefore, in the medium term consideration of a revised rolling
programme of maintenance will be required, which when developed
could create a budget pressure and require consideration as part of the
council’s financial planning. 
(d) Risk Implications
The ICT Strategy and Plan are based on assessment of the issues and
risks anticipated in relation to the council’s technological requirements
and identify actions to address these. The actions in the ICT plan have
been prioritised and if necessary, activity will be reduced or ceased on
those actions ranked lowest. Given the focus on transformation through
responding to the Best Value Audit Report, budget related changes,
cyber resilience, modernisation and improvement it will be challenging
for the ICT service to deliver on all of the work identified and so there is a
risk of slippage that could have an impact on services. Any issues and
proposed remediation will be identified for consideration. The
requirement for additional ICT support on an ongoing basis to support
the number of mobile devices in use across the council (140% increase
over the course of the pandemic) also remains a demand which
continues to be monitored.
Cyber security also continues to be a significant risk to the Council’s
operations.   While it is not possible to predict exactly, time is allocated to
enable this and other unplanned demands to be addressed without long
term impact on the progress of other planned work which has been
estimated at a lower percentage capacity as a mitigation to enable this.  
With reference to ICT and digital developments within Education, the
main objective is to ensure the ICT infrastructure is fit for purpose for the
current delivery of education and in a state of readiness to support
further digital developments such as equitable access and digital
learning environments to minimise the risks of further digital inequity and
the consequent impact on learning and teaching, attainment and
achievement.   The risk of the impact of poor connectivity and digital
provision on learning and teaching opportunities and overall attainment
is significant and remains likely. The work to secure improvement has
been escalated both internally, with third party providers and to the
Scottish Government. 
(e) Staffing Implications
As noted above, the ICT technology and devices in use in the council
has expanded over recent years and as the permanent ICT resource has
been static, there is pressure and risk associated with operating at fully
stretched capacity.  However, the work set out will be accommodated
within existing resources and re-prioritised as necessary to ensure that
this remains possible. 
The nature of the ICT operating environment is that there can be 
unplanned demands made on the ICT Service, which require immediate
diversion of attention and resources.  Therefore, the resources required
Page 45

Page 46

to deliver the actions and the progress of the ICT Strategy require to be
monitored carefully. 
As the Council seeks to transform and modernise and prepares its digital
strategy and plans, it is likely that specific technological issues will
emerge. As these emerge, the ICT team will be involved in the planning
of the required changes. 
(f) Property
None. 
(g) Equalities/Socio Economic Impact
ICT is an enabler that addresses equalities issues through improved
accessibility through monitoring accessibility standards ensuring the
internal and external websites are compliant.   The increased flexibility
from remote working supports employees with caring responsibilities as
well as enabling people with disabilities to sustain employment. 
(h) Climate Change and Biodiversity Impacts
The ICT service is represented on the Council’s Climate Change Board
and works closely with the Climate Change Team to achieve actions in
the Climate Change Action Plan.  Supporting the move to increased
remote working contributes towards the reduction of carbon emissions
from commuter travel. 
(i) Consultations
ECMT have been consulted on the draft documents and their views
incorporated into the proposals.  The report has also been circulated to
the Democratic Services Manager and comments incorporated.   
5. CONCLUSION 
5.1 This report provides an update on progress of current planned ICT and
digital work during 2024/25.   
5.2 It proposes a change of approach to enable the Council to focus on
establishing its digital transformation ambition and vision including
identification of 2 or 3 key projects increasing the pace of Digital
Transformation as per the Best Value Action Plan. 
5.3 The ICT Strategy (2025-2028) and Plan for 2025-26 sets out how the
service will ensure continued maintenance and development of
business systems, infrastructure and security. 
Author of Report: Frances Garrow, Head of HR, ICT & OD
Background Papers: Appendix 1 – ICT Strategy 2025-2028 – SPMAN-
1656699058-266 
Page 46

Page 47

Appendix 2 – Progress on planned work (SPMAN-
1656699058-274)
Ref: SPMAN-1656699058-265
Page 47

Page 48

Page 48

Page 49

APPENDIX 1 
MORAY COUNCIL
ICT STRATEGY (2025-28) 
Item 8.
Page 49

Page 50

1 
1. Introduction 
1.1 As an enabling service, ICT recognises the need to support the ambitions of
the council and ensure the core ICT infrastructure supports both the use of
ICT and digital transformation to deliver against the corporate priorities.   This
involves continuing to provide infrastructure, device and system support,
maintenance, development of current platforms and security to allow for
business as usual within the context of a rapidly evolving technical
environment. 
1.2 Digital development is closely linked with ICT however the scale and extent of
digital development that is required to support transformation as well as digital
maturity is extensive and the Council’s aspirations in this regard will be set out
within a separate Digital Strategy and Plan. 
2. Drivers 
2.1 This revision of the Moray Council ICT Strategy has been developed within
the context of the following drivers: 
Corporate Objectives, Best Value and Transformation - The ICT Strategy is
aligned to the council’s vision and strategic priorities contained within the
corporate plan as per section 1.1 and 1.2 and the Local Outcome
Improvement Plan including enabling and supporting transformational change. 
Additionally, the Council has a Best Value Action Plan and a Transformation
Strategy and action plan that will require ICT input to put into effect. 
Services and staff expectations - Council services require access to reliable
and forward-looking technology which helps them do their job rather than
constrains them.  They require greater flexibility in the way they work and use
technology to be more productive whether at their desk, in the field or from
home.  Services expect: 
• Reliable and strong connectivity to enable access to devices, systems and
platforms e.g. within schools.
• Access to accurate, trusted and timely information and data to perform in
their role and to assist decision making.
• Development of their services using technology to improve service delivery
and achieve efficiency savings.
• To develop their knowledge and skills to deliver change. 
Customer expectations - Customers increasingly expect “on demand” access
to commercially available day to day services.  This is driving a change in the
Page 50

Page 51

2 
way they expect council services to be delivered to them and the council must
change to meet their expectations.  This includes: 
• Placing the citizen at the core of responsive services, accessing services
at a time and place that is convenient to them and on their chosen device.
• While acknowledging potential compliance issues most of our customers
expect public services to be “joined up” and at the very least with all
Departments within the council.  Sharing of data within the council and
across partner organisations to deliver improvements to service delivery is
imperative to the customer experience.
• Consistency and openness in all their dealings with the Council.
• Choice in how they access services.  Although there is an expectation that
we will provide online services there is a need to balance this with choice. 
While we aim to deliver online services in an easy-to-use manner and
encourage the uptake of these online services there remains a need to
cater for those that prefer, or otherwise do not have access to, online
solutions. 
The increased volume of cyber crime impacts on the day-to-day operations
through the volume of threat notifications, investigation and remedial work
required as well as ensuring progress with actions arising from planned cyber
resilience work. 
Alongside the above drivers are organisational culture and behaviour changes
that are required to support successful implementation of new technology. 
Specific developments that will impact on the delivery of this strategy include: 
• Corporate and Strategic – alignment with corporate priorities,
supporting and enabling achievement of Best Value actions including
transformation.
• Ensuring the infrastructure in schools supports future curriculum
delivery and increasing numbers of technologies and user bases. 
• Cyber resilience - significant increase cyber related activity as well as
ensuring compliance with the standards arising from the UK and
Scottish Government responses to the external environment.
• Market developments e.g. growth in Cloud computing, use of social
media as a service delivery vehicle, artificial intelligence, etc. 
3 Principles 
All developments within the strategy will be guided by the following principles
to provide consistency and clarity around the work undertaken.   
3.1 Information Assurance
Page 51

Page 52

3 
ICT solutions will be developed to ensure they maintain the security,
confidentiality and integrity of all personal data in line with the requirements of
the General Data Protection Regulations (GDPR), other security standards
such as the Payment Card Industry Data Security Standards (PCI/DSS) and
the Scottish Governments Cyber Resilience Programme. 
We will
• Protect the data held through the implementation of best practice security
standards.
• Engage with the Scottish Governments cyber resilience programme.
• Encourage the adoption of open data where possible.
• Improve data available for decision making. 
3.2 Digital first
To continuously improve services with the focus on the customer we aim to
adhere to the Digital First Service Standard and the 3 themes of user needs,
technology and business capability / capacity for all digital services,
processes and supporting ICT. 
We will
• Develop systems and processes with the customer at the centre
• Encourage adoption of online, no contact services
• Communicate with our customers electronically where possible.
• Add efficiency to service delivery
• Do it once – share information where possible
• Prepare for the future by monitoring developments in technology
3.3 Reuse
The council utilise a range of systems to deliver services to the public and the
core applications will become increasingly important as we pursue a joined up
council.  Where we are looking for change we will seek to reuse or improve
existing applications rather than developing from scratch.  
We will:
• Reuse solutions and reduce the total number of solutions supported
• Process redesign through the reuse of existing tried and tested solutions
• Reduce the duplication of data collected and establish a single view of our
customer 
3.4 Managed risk
There is a need to employ risk management to drive the service but a
balanced approach will be required to avoid risks preventing or inhibiting
progress to the detriment of our service users. 
Page 52

Page 53

4 
We will:
• Work with services to understand their requirements
• Keep services aware of the art of the possible
• Pro-actively look for solutions rather than inhibit development of council
services
• Remove barriers where possible, but where there is a valid reason why
requirements cannot be met, we will provide a clear explanation 
4. Priorities 
From the preceding drivers and principles of this ICT Strategy, 4 key priorities
have been identified, 
1. Supporting ICT Development 
2. Business Intelligence and Insight 
3. Assurance 
4. Forward Planning 
4.1 Supporting ICT Development 
The Council seeks to transform services and introduce change for our
customers while driving service efficiencies.  To support these ambitions the
ICT Service will aim to: 
a) Improve the clarity and awareness of the organisation’s ICT Strategy and
corporate agenda.
b) Support transformation work to improve service delivery, enhance
community engagement and drive organisational effectiveness.
c) Use technology to help identify inefficiencies, bottlenecks and areas for
improvement
d) Extend the availability of online services available to the public by
expanding the single view of their transactions with the council via the
customer portal.   
e) Continue development of shared network protocols. 
f)   Continue to improve the Education ICT infrastructure to meet the future
needs of ongoing Curriculum Reform and key objectives for successful
digital learning and teaching. 
4.2 Business Intelligence and Insight 
Data is one of our most valuable assets and although Moray Council holds
vast amounts of data it is primarily held in departmental silos.  To unlock the
value of this data an open and transparent approach will be developed. 
Providing open and transparent access to data will provide employees the
information to perform their role, managers with the data to manage the
service, Elected Members with the data to make decisions based on timely
Page 53

Page 54

5 
and relevant information and also importantly enable the public to understand
the reasons for the decisions we make.  To support this priority we aim to: 
a) Contribute towards a data management strategy – to share data safely
and lawfully in line with data protection principles and general data
protection regulations supported by robust data sharing agreements.
b) Improve data quality and integration - continue with the development of a
single trusted view of our customer to ensure consistency, accuracy and
trust in the data held and to benefit the customer and provide further
efficiency to council services.
c) Improve data analytics capacity - co-design and enable with individual
services data analytics capacity including digital dashboards for staff,
elected members and the public to view data appropriate to need and
better understand the underlying trends within their service and the actions
required to address any issues and/or to improve services with automation
built in where possible.
d) Building the technical capabilities of staff in data management, analysis
and technology utilisation. 
4.3 Assurance 
The ICT service is subjected to an increasing number of compliance regimes
including Public Service Network (PSN) accreditation, General Data
Protection Regulations (GDPR), Payment Card Industry Data Security
Standards (PCI DSS), Scottish Government Cyber Resilience programme and
software licensing.  There is a need to develop policies and procedures to
ensure an ongoing approach to compliance within the council and this should
be supported by a consistent and managed approach to staff awareness.  To
meet our obligations in relation to compliance and standards we aim to: 
a) Review the ICT Security Policy to ensure that security controls are
adequate and up to date, building on identified good practice.
b) Continue to maintain our device estate to ensure it is built around a recent
operating system version of operating system and that the office
productivity toolset is delivered to current Windows devices
c) Review our business continuity arrangements to mitigate against potential
risk and to put ICT in a position to assist services to deliver essential
functions in the event of a disaster.
d) Review government guidance, and implement any amendments, to ensure
the secure exchange of email with other public sector organisation.
e) Adopt industry standard methodology for the delivery of our support
service to introduce robust best practice processes and improved reliability
and quality of service
f) Improve user awareness, knowledge and understanding of role and
responsibility with regard to compliance
Page 54

Page 55

6 
4.4 Forward Planning 
The pace of technology change continues to increase and it is important that
within the context of a 3-year strategy we continue to plan for opportunities
that are presented from advancements in technology and ensure the Council
is sighted on best practice and ICT and digital developments both across the
local government environment and within technological disciplines.  To plan
for the future we aim to:  
(a) Investigate options to deliver efficiencies through cost effective solutions
which do not introduce unnecessary risk to the operation of the council.
(b) Review mobile application development tools and standards. 
(c) Identify the potential for and implement collaboration tools to deliver further
efficiency savings. 
(d) Review the application portfolio with a view to rationalising the number of
applications in use throughout the council, reduced the number of systems to
be supported and consolidate the number of data sources.
Page 55

Page 56

APPENDIX 1 
Page 56

Page 57

APPENDIX 2
ICT and Digital Strategy 2024/25 – Update on Planned Work 
Transformation
1 There are now 105 services available online, ranging from school and nursery
registrations, benefits applications and corporate complaints forms.  The focus
is now shifting to consider service improvements such as further integration
with back office systems, inter-operability and enabling efficiencies 
2 The move to M365 is predominantly complete with three quarters of all users
and shared mailboxes migrated and 70% of all devices with access.
Configuration for the final deployment is well underway  being progressed as
business-as-usual work by the team.   This has enabled improved access to
the usual Office applications with advanced features such as real-time
collaboration and intelligent suggestions.  Microsoft Teams provides a hub for
teamwork that integrates chat, video meetings, file storage and application
integration making it easier for teams to collaborate and communicate.  
OneDrive enables access to documents with strong security features to help
protect user data.   
3 Support for Phase 1 of the Smarter Working Project which was the most
significant in ICT terms is complete with approximately 81% of staff that use
ICT, now utilising mobile devices. Some connectivity is available for
NHS staff within council offices and WiFi access in schools extended.
Preparatory work for Phase 2 is now well underway.   
Business Intelligence
4 Following a successful pilot with third sector organisations, a Personal Data
Store (PDS) that will enhance the value of council data is now live. Next
stages of this project is being led by Health and Social Care Moray.
Workshops are being held with ICT providing technical support as required. 
5 To ensure access to clear and up to date workforce information, data
dashboards were re-developed by HR and ICT. Following positive feedback,
these are now available at Service level with further dashboards, featuring
other key management related information, being piloted. 
Assurance
6 Cyber Resilience work is ongoing with summaries received on a daily basis
from the Scottish Cyber Co-ordination Centre and discussions ongoing
around incident response and planning. Communication and awareness
raising has been supplemented with an online training module which was
launched in February. 
Forward Planning
7 Throughout the reporting year, ICT have worked with services and external
organisations to identify and plan the replacement of corporate systems. Work
around Care First is ongoing while a pilot Sharepoint 365 site was
successfully built and tested with recommendations this be adopted for the
Common Data Environment. Replacement of a new Learning Management
System is progressing with procurement.
Item 8.
Page 57

Page 58

Page 58

Page 59

REPORT TO: CORPORATE COMMITTEE 28 JANUARY 2025 
SUBJECT: TRANSFORMATION STRATEGY DEVELOPMENT 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To ask the Committee to consider and note progress on the delivery of the
Council’s Transformation Strategy as part of the ongoing monitoring of
progress. 
1.2 This report is submitted to the Committee in terms of Section III (A) 2 of the
Council's Scheme of Administration relating to considering Capital and
Revenue Budgets and long-term financial plans. 
2. RECOMMENDATIONS 
2.1 It is recommended that the Committee considers and notes progress on
the delivery of the Council’s Transformation Strategy. 
3. BACKGROUND 
3.1 The Council at its meeting on 24 April 2024 agreed the first iteration of a new,
developing Council Transformation Strategy to take forward a continued focus
on delivering transformation projects already in progress, accelerate and
expand where there is opportunity and develop new areas of work to support
the council’s financial sustainability, providing a sound foundation for future
transformation work (para 9 of the minute refers) 
3.2 The Strategy agreed in April 2024 is made up of a programme of projects to
continue the council’s transformation journey.  These are categorised as new,
innovation, additional, expansion and current.  An update to the Strategy,
including the development of new projects was agreed by the Council on 13
August 2024 (para 10 of the minute refers).   
3.3 The Transformation Strategy has developed to include the following projects
which were agreed to commence as noted below: 
13 August 2024: LED Lighting; Solar Panels 
22 October 2024: Out of Hours Service
Item 9.
Page 59

Page 60

3.4 Appendix 1 gives an update of progress on specific project areas to show the
development work that has taken place since the last update report in August. 
A summary of key points is given below. 
i) Leisure review – externally commissioned review on leisure services
has progressed with report received and an update provided to the
council on 21 January 2025 which will include increasing income and
proposes to hold a members workshop to lead into a further report on
the future of the service.
ii) Libraries review – consultation has been undertaken on proposals
agreed by the Council on 22 October and the feedback will be reported
to the Council in February for direction on how to proceed. 
iii) ASN review – further change management, training and arrangements
for the alternative curriculum have all moved forward as planned.
iv) Learning estate – progress on engagement within ASGs (associated
school groups), consultation on the common good aspects of the
preferred site for Forres Academy and future planning with the learning
estate working group have all moved on.  The member Working Group
has also concluded and identified actions for progress which will be
reported to ECLS committee.
v) Smarter working – phase 2 is underway to deliver further savings from
relocation into the HQ campus and phase 3 was agreed by Council on
4 December 2024.
vi) Depot review – draft project plan was agreed by the project Board and
work is underway on the full business case for reporting in March 2025. 
3.5 The progress tracking in Appendix 1 identifies that further projects are
reaching a stage where they will be ready to report to the next committee
cycle to continue the development and definition of the council’s programme
of transformatiom work over the planned 12 month period set out in the
Strategy.  Specifically, a workshop in February and follow up committee report
is planned on Leisure review, Workforce review is reporting to CMT in
February and Learning estate review working group has identified actions to
report to ECLS Committee In May 2025.  Work is also continuing on the
definition and development of further transformation projects with a project on
use of council Vehicles at the concept definition stage and a proposed update
to the Digital Strategy in preparation. 
3.6 However, there are a small number of projects where progress has been less
consistent and these are highlighted as red or amber on the schedule in
Appendix 1.  These are mainly due to issues of resourcing, either where
arrangements are yet to be put in place or where limited specialist resources
had to be diverted to operational priorities to ensure service continuity.  These
include: schools business administration, schools digital and service efficiency
lean project.  An alternative to resourcing the project is being considered for
the Business Administration project to enable progress to be made over the
coming months as recruitment was not successful.  Internal resourcing
Page 60

Page 61

arrangements have been reviewed in ICT to provide ongoing support to work
on improving schools connectivity and the team continues to work with
partners to overcome issues being experienced on the schools network. The
learning estate work is amber for different reasons related to the challenges of
budget pressures for capital projects of this nature and decisions that have
affected the originally planned timescales, such as the timing for Leip 3
decision.  These latter points will be addressed through the affordability work
noted and a review of project timescale to take account of the factors
influencing progress, which is due to be reported to ECLS Committee in
February. 
3.7 The next Transformation Strategy update is planned to include consideration
of Stage 3 of the development of the council’s transformation strategy which
recognises that further substantial work is necessary, including identifying
approaches that could be considered for the Future Council.  This will also
take account of the enabling potential of transformation work that could
underpin future change and efficiency and have indirect financial benefits,
ensuring the sustainability and effectiveness of council services for the future.
A Members workshop will be planned to contribute to this forward planning.
This will focus on a pathway for further development and further opportunities
to work towards future council transformation. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The new Transformation Strategy is the development of the Council
commitment in the Corporate Plan to the values of Ambitious: ensuring
sustainable and efficient services; and Improving: drive improvement,
encourage innovation and invest in transforming to meeting future needs
and forms the Transformation Strategy referred to in the Strategic
Delivery Framework. 
The transformation strategy and projects contribute to the Council’s
priorities of tackling poverty and inequality, building stronger greener
vibrant economy and building thriving, resilience empowered
communities.  The projects also support the strategic delivery framework
of the financial strategy workforce strategy and digital strategy. 
(b) Policy and Legal
None. 
(c) Financial implications
The financial implications of the IMP have been approved in previous
reports.  The table below has been updated to include the changes
approved by the Council on 13 August 2024 and tracks the investment
and savings generated since the programme was started in 2018.  
Page 61

Page 62

Project Cost
2018-2024
£000s
Budget
cost
2024/25
£000s
Actual
Savings
2018-2024
£000s
Projected
savings
2024/25
£000s
Future
projected
savings
£000s
Total
projected
savings
£000s
IMP 1,104  1,279   2,266
BIM 11     -
ASN
Review
596 289 -   -
Just
Transition 
30 -   -
School
Business
Support 
29 -   
Learning
Estate
ESO (Note
1) 
22    Not
quantified
yet
Smarter
Working 
72  44 (actual
54)
68 122
Depot and
Stores
review       
Note 1: the cost here is approved as additional to the core cost of the Learning
Estate team 
(d) Risk Implications 
The risks associated with the transformation programme are managed
through the relevant programme boards and overseen by CMT/SMT. 
There are no changes to the current risk profile and it is noted that, with
reporting of the first iteration of the new Transformation Strategy,
progress is being made in maintaining pace which has previously been
noted as a risk.  However, the risks associated with change and the
success of transformation remain and will continue to be monitored. 
In order to manage these risks, the Council will:  
(i) Ensure that all projects meet a given standard of governance that
is proportionate to the change.
(ii) Ensure there are adequate resources for the overall programme
of work and for individual projects.
(iii) Manage the dependencies and interdependencies across the
scope of the change and its implications for other areas of
prioritised work.
(iv) Appoint appropriate project resources and failing which, review
whether objectives are deliverable and review planned work
accordingly. 
(e) Staffing Implications
There continue to be challenges in securing resources and service
capacity to progress projects.  However, the allocation of specific project
resources to specific projects is showing impact with projects such as
smarter working and learning estate showing good progress.  This
Page 62

Page 63

approach will be built upon as projects are identified and reach an
appropriate stage.  Resourcing at Council level including corporate
programme management and oversight will be revisited as the next
stages of the Transformation Strategy work and the council management
structure emerges. 
(f) Property
No direct implications from this report, although property is the subject of
one of the workstreams and is impacted by the Energy projects.  The
issues arising from this will be reported in due course with activity on
climate change being progressed as a stand-alone programme of
activity.
.
(g) Equalities/Socio Economic Impact
For the purposes of this report an Equality and a Socio Impact
Assessment are not required, however it is acknowledged that various
workstreams will identify change that will have an impact on equalities
and socio economic considerations and will be reported in due course. 
(h) Climate Change and Biodiversity Impacts
There are no immediate climate change implications directly arising from
this report. However, the energy projects make a contribution to future
environmental sustainability and climate change. This is reported in the
report relating to these specific projects. 
(i) Consultations
The Extended Corporate Management team have been involved in the
ongoing development of the transformation programme, including as the
project initiation board reviewing new mandates and driving forward
specific project work. They have contributed to the project updates in
Appendix 1. 
5. CONCLUSION 
5.1 The Transformation Strategy approved by the Council on 24 April 2024
and further developed by the Council by adding new projects, is under
development and this report notes the progress made since November
2024. Work continues on the development and reporting of individual
project proposals and a further quarterly progress report will come
forward to committee in April 2025. 
Author of Report: Denise Whitworth, DCE ECOD
Background Papers: Reports updating on progress on Improvement and
Modernisation Programme to: 
12 May 2021 Full Council (Item 09 Report and Appendix
A / B / C / D / E )
15 September 2021 Full Council (Item 15 Report and
Appendix 1 / 2 / 3) 
15 March 2022 Corporate Committee (Item 13a Report
and Appendix)
Page 63

Page 64

30 August 2022 Corporate Committee (Item 06 Report
and Appendix ) 
25 April 2023 Corporate Committee (Item 08 Report and
Appendix) 
7 November 2023 Corporate Committee (Item 07 Report
and Appendix 1 / 2) 
23 April 2024 Corporate Committee (item 06 Report ) and
Appendix) 
24 April 2024 Special Full Council (item 04 Report and
Appendix 1 and Appendix 2) 
13 August 2024 Full Council (item 6a Report and
Appendix 1 and Appendix 2 
5 November 2024 Corporate Committee (item 16 Report
and Appendix) 
Ref: SPMAN-1108985784-1039 
Page 64

Page 65

Transformation Programme Update: to 31 December 2024
(Report to Corporate Committee January 2025) 
Project
Titles:
Phase
Schedule
Budget
Objective
s %
complete
Progress Update Next Steps
TRANSFORM EDUCATION 
Leisure
Review
Definition
Not yet developed   
Members briefing on report held Jan 2025 
Moray-Wide Leisure services external report was received.  The
report contains extensive information and date for consideration in
relation to future service options. 
Transformation Workshop was held to consider future service
design – Sept 24 – completed, 
Future service design was considered at Members Workshop on
21-08-24 
Review of external feasibility
study report 
Members workshop on future
service 
Report to Council on future
options following workshop
(date tbc)
Libraries
Review
Definition
Not yet developed   
Public consultation on proposed future service design took place in
Nov and to be reported to council in Feb 25 
Council report considered at council on 22-10-24 and future service
design approved for consultation 
Transformation Workshop to consider future service design – Sept
24 – completed, future service design considered at Members
Workshop on 21-08-24 
Report to council for decision
on future service (by Feb 25) 
Implementation of new service
model (by Oct 25) – subject to
council decision 
Education
HQ
Business
Admin
Support
Team
Delivery
AMBER  GREEN  GREEN
20 Project moved from definition to delivery Savings have been
achieved through vacancy management 
Work commenced on process review, however, stalled due to
resourcing.  
Secure project resource 
Complete lean process review
and design new procedures 
Item 9.
Page 65

Page 66

Transformation Programme Update: to 31 December 2024
(Report to Corporate Committee January 2025)
Raising
Attainment:
Well-being
(ASN)
Delivery
GREEN  GREEN  GREEN
70 Alternative Curriculum:  flexible framework for the alternative
curriculum is progressing well. 
SEBN Change Management: implemented November 24 
B6 Autism Service moved to Elgin Academy as enhanced provision
with PT ASN appointed. 
East End annexe flexible provision developed 
Moray Adapted curriculum – pupils are now transitioning to this
resource and with access to flexible framework. 
Pinefield provision has been reviewed for young people at risk of
not being educated  with 2 cohorts for BGE and senior phase
working closely with youth justice. 
Reconsidering west flexible provision and instead considering east
one in Buckie where potential premises being considered. 
Policy Guidance and review has not progressed due to capacity to
deliver other progress updates 
ASN handbook has been reviewed and will go to LNCT in January
as an interactive tool to support schools and settings 
ASN Parent engagement: date for meeting with Chair/Vice/ICE
planned but did not go ahead 
CMPs for SES and EAL services have been written and will
progress in January 
ASN governance has been developed and a review of groups with
the implementation of CARE (children at risk in education) 
Service is moving from BSS to CALM to support behaviour where
trainers have been trained 
Parent Carer survey has been developed 
Develop ASN forecasting tool
and annual moderation
process 
Continue to review and
develop and plan for 2 cohorts
for both BGE and senior
phase 
To consider setting up East
FLR where works may be
required. 
Plan to be developed 
Current training offer to be
reviewed so that 2025/26 will
allow time to embed this in
practice. Continue to roll out
training for newly appointed
PSAs.  Feedback will continue
to be introduced to ad hoc
training to gather evidence of
impact and any gaps in
provision. 
Continue to engage with
parents and consider move to
Page 66

Page 67

Transformation Programme Update: to 31 December 2024
(Report to Corporate Committee January 2025)
Project
Titles:
Phase
Schedule
Budget
Objective
s %
complete
Progress Update Next Steps
Support group to include a
range of parents across Moray
Business
Support for
Schools
(Schools
Business
Admin)
Delivery
RED AMBER AMBER
65 Corporate Committee agreed to allocate project officer resource to
support the delivery of the project.  Alternatives being considered
as appointee did not take up post 
Explore alternatives for project
officer resource 
Review of the project to
address feedback on both the
Change Management Plan
and Improvement Plan 
Raising
Attainment:
Curriculum
Breadth -
Digital
Inclusion
Delivery 
RED GREEN GREEN
50 Overall Project Status RED: work delayed due to deployment of
resources to management of pressure on network connections 
Dec 24 : All schools have been sent instructions to part enrol
devices to allow internet access.  All ipads ordered since enrolled
as managed devices. 
The enrolment of devices as fully managed will not be a quick as
first thought due to iPads iOS being so out of date and school
bandwidths meaning ICT are unable to update on site. As well as
some iPads being locked by users this has resulted in all devices
having to come back to HQ to be updated and fixed prior to full
enrolment. This was an unforeseen issue which will slow down the
implementation of fully enrolled devices. 
Rollout all iPads from ICT that
have been purchased since
the MDM change – Target
Date Jan 25 
- Complete the implementation
of fully managed devices for
Elgin ASGs – target date is
Feb 25 
- schedule in the remaining
ASGs for iPad collection and
full enrolment once Elgin
ASGs are completed. Forres,
Speyside, Milnes, Buckie &
Keith 
Page 67

Page 68

Transformation Programme Update: to 31 December 2024
(Report to Corporate Committee January 2025)
Project
Titles:
Phase
Schedule
Budget
Objective
s %
complete
Progress Update Next Steps
Schools for
Future -
Learning
Estate
review 
AMBER AMBER GREEN
5% Schedule remains amber overall as there have been a number of
factors influencing the originally planned timescales. 
o Findrassie – project is on hold due to updated roll forecasts, per
ECLS committee 
o Forres Academy –consultation re common good in progress to
mid November for reporting by Dec.  Work underway to manage
and ensure affordability 
o Buckie – affordability within capital plan and timing to be
considered
o B-B Upgrade work – timing to be adjusted for affordability 
o Crossroads –report recommending formal consultation on future
approved at ECLS committee on 17-09-24 
Budget and affordability are an ongoing challenge with this
programme of work 
ASG Engagement – Elgin, Keith and Speyside Associated school
groups (ASG) underway.  Forres and Buckie progressed to next
stages and Milnes about to commence 
Transformation Workshop held 21-08-24 to consider future of this
project re whether to accelerate and extended to deliver fewer
Schools operating at greater levels of occupancy and efficiency. 
Working group now agreed by ECLS Committee on 17/09/24 and
work underway. Working group has concluded and based on
outcomes, necessary reporting will be to ECLS committee rather
than council in February. 
Review of projects to take
account of capital plan
affordability and projected rolls
(Feb 25) 
Report to ECLS committee on
outcomes from working group
re progressing learning estate
rationalisation (May 25) 
Page 68

Page 69

Transformation Programme Update: to 31 December 2024
(Report to Corporate Committee January 2025) 
TRANSFORM COUNCIL 
Digital
Services
Research
Not yet developed   
Digital strategy in draft and scheduled for CMT consideration and
reporting to committee in 2025 
Workshop facilitated by Digital Office and Socitm held on 3/7. 
Dec 24 Update: early approach drafted, needs further work.
Development sessions planned for early 25 to inform thinking on
themes and Council approach.
Report to Committee early
2025 on proposed strategy 
Development sessions 
Service
Reviews
Concept
Not
yet
develo
ped   
This area does not have resource allocated and is impacted by
other workloads 
Early discussion paper prepared and further development required. 
May present methodology to advance emerging agendas such as
digital, lean and sustainability
Management consideration of
concept and potential benefits
Workforce
Changes
Concept
Not
yet
develo
ped   
Proposed negotiating strategy drafted and being further developed
following political steer ahead of reporting to council. Further work
to define benefits underway 
Outline business case being prepared to establish as project. 
Transformation Workshop to consider future of this project held on
21-08-24 
Dec 24: further calculations developed and considered by CMT. 
Initial interaction with TUs for confidential soundings undertaken.
Refinement of Council position underway for achievable actions. 
Way forward to be considered by CMT taking account of updated
revenue budget position which enables a wider range of options
and does not require to be reported in Feb 25.   
Report to CMT for direction on
proposed project (Feb 25) 
Page 69

Page 70

Transformation Programme Update: to 31 December 2024
(Report to Corporate Committee January 2025)
Out of
Hours
Services
Definition
Not
yet
develo
ped   
Business case finalised and approved at Council to progress in
October 2024. 
Project mandate prepared and agreed by CMT/SMT as project
initiation 
Development of options in
business case as agreed by
council
Customer
Service
and
systems
support
Definition
Research
Not
yet
develo
ped   
Business case completed for replacement customer relationship
management system and considered by cmt/smt.  New Customer
Services Manager appointment in progress following retirement and
will be taken forward by new postholder. 
Asset
Manageme
nt (was
PAMA)
Delivery
N/A £83K
£200K
Rev.
£250K
Cap.
saving 
80  
o Smarter
Working 
Delivery
GREE
N
Phase
2:
£105k
(reven
ue)
£60k
(capit
al)
GREE
N
40 Phase 1 has now been completed, vacating 9 North Guildry Street,
Elgin; 13 Cluny Square, Buckie; and
9C Southfield, Elgin.   
Phase 2 is underway, with a further office rental already in place
and schedule of further consolidation progressing. Registrars have
moved from 232-240 High Street to HQ 
Proposals for Phase 3 were approved by Full Council on 04/12/24,
incorporating options for Keith, additional income and savings from
commissioned services.   
Additionally work is ongoing to review the Business Gateway
premises at 17 High Street and to explore options for Grampian
Valuation Joint Board. 
Phase 2 will deliver further
savings from the relocation of
employees to vacant space
within the HQ campus from a
number of other premises in
the Elgin area:
Beechbrae
10 Duffus Road
Ashgrove Depot portacabins 
Page 70

Page 71

Transformation Programme Update: to 31 December 2024
(Report to Corporate Committee January 2025)
o Depot
Review
Definition
GREE
N
£76k
(reven
ue)
GREE
N
GREE
N
75 The Outline Business Case was approved at ED&I committee on 30
April 2024, including budget to resource development of the Full
Business Case. 
A specialist consultant has been appointed to undertake
development of the Full Business Case from November 2024 and
working to the target delivery date of March 2025. 
The draft project plan was approved by the project board on
19/12/24
Implementation of project plan
to proceed 
Property
Asset
Mgmt.
Stage 2 –
Shared
Community
hubs for
public/3rd
sector
On hold   
This is a second stage of the PAMA work that is yet to be
scheduled. 
Relative priority to be reviewed following delivery of stage 1 above.  
Where possible, shared use of
buildings with partners will be
incorporated into capital
developments on an ongoing
basis as opportunities arise 
Service
Efficiency –
Lean
Reviews
Definition
– on hold
RED GREE
N
GREE
N
25  This project is being re-prioritised for the Future Council work Definition and Prioritisation of
project to be considered for
next stage of IMP/Future
Council 
Page 71

Page 72

Transformation Programme Update: to 31 December 2024
(Report to Corporate Committee January 2025) 
TRANSFORM ECONOMY 
Industrial
Estates
Concept
Not yet developed   
Project mandate prepared and approved by CMT/SMT. 
A briefing on the content of the mandate took place with
chair/vice chair of ED&I committee to inform the approach to
future reporting. 
As part of the Industrial Portfolio Annual Report to ED&I
committee on 03 September 2024 approval was given for the
recommendation to appoint a Chartered Surveyor to evaluate
options with respect to the property identified for potential
disposal.  
Appointment of a Chartered
Surveyor is pending, further to
which a report with
findings/recommendations will go to
ED&I committee by April 2025.   
Vehicles
(inc pool
cars)
Concept
Not yet
developed   
Draft Concept Proposal  reviewed at Extended CMT meeting
on 4.12.24
further refinement of proposal to be
completed and draft project
mandate to be prepared before
financial year end.
Page 72

Page 73

Transformation Programme Update: to 31 December 2024
(Report to Corporate Committee January 2025)
Net Zero
–
Minimisin
g energy
use and
carbon
emissions
:
o LED
o Solar
PV
Definition
Not yet
develo
ped   
Project mandates prepared focussed on Solar PV and LED
and approved by CMT/SMT. 
A report to Full Council on 13 August 2024 approved the
proposed approach to upgrading lighting to LED and installing
solar panels on corporate buildings.   
Engagement with the design team
and contractors has begun. Initially
looking at HQ, Annexe and
Ashgrove Depot.     
Proposals with costings have been
prepared and will be reviewed by
the Head of Housing and Property
Services and, Chief Financial Officer
in line with the delegated authority. 
Subject to approval, the project
remains on schedule for the
construction phase to commence
before financial year end.
BIM
Implementation 
GREE
N
GRE
EN
GREE
N  
Phases 1 and 2 have been completed
Business Case was considered at the Transforming the
Economy Board and the FBC approved at EDI in June 2024.
Project moving to initiation of next stages.
Implementation Programme developed for approval by
Transforming the Economy Board on 29 October 2024.
Key Stakeholders meetings held to advise that BIM project
approved by Full Council and implementation stage reached. 
Project Initiation Document (PID) is
being drafted and procurement
arrangements for BIM Advisor
appointment underway.
Engagement with Design Team and
Contractor on BIM Pilot Project
(Forres Academy Replacement) will
be arranged in line with the project
milestones. 
Page 73

Page 74

Page 74

Page 75

REPORT TO: CORPORATE COMMITTEE 28 JANUARY 2025 
SUBJECT: LEADERSHIP DEVELOPMENT 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of progress regarding developing leadership capacity
in accordance with the Corporate Workforce Plan 2024/25, Best Value Action
Plan and HR and OD Service Plan 2024/25. 
1.2 This report is submitted to Committee in terms of Section III (B) (24)(a) and (c)
of the Council's Scheme of Administration relating to appraisal and training
and development policies and practices. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee: 
i)  consider and note the indicative Leadership Development Strategy
and Plan to address corporate and individual leadership needs; 
ii)  approve taking initial steps to support leadership development as set
out in the report as part of an introductory phase; and 
iii) note that the indicative strategy and plan will be further developed
and refined and reported to committee for approval following the
corporate management structure review and commencement of the
new Chief Executive. 
3. BACKGROUND 
3.1 The Council’s Workforce and Organisational Development Strategy (2024 –
2027) outlines the background and context for the importance of developing
leadership capacity, including the Council’s vision, values and priorities along
with national, local, Council and service specific challenges and issues.   This
includes addressing Best Value scrutiny challenges,  increasing the pace and
depth of transformational change, reshaping to the council of the future,
changes of ways of working and finding ways to become more sustainable. 
Item 10.
Page 75

Page 76

3.2 Leadership and management skills and capacity are a key priority to enable
the culture of the organisation to adapt and change to meet the challenges of
changing service delivery particularly within the context of reduced budgets. 
3.3 To this end, the following was agreed as part of the Workforce and
Organisational Development Strategy (2024-2027) at Corporate Committee on
27 August 2024 (para 6 of the minute refers): 
• Establish a leadership development programme to address corporate
and individual leadership needs including collaborative and distributed
leadership
• Develop collaborative leadership skills required to support
transformation 
• Cascade a programme of leadership development activity that enables
and empowers strong visible leadership across the organisation. 
Current Position
3.4 A Programme of Leadership Development Activity was agreed in 2019/2020
which included a range of initiatives and interventions. This included the
delivery of Leading in Complexity, Three Horizons and Action Learning Sets to
CMT and Heads of Service by the Improvement Service, with the continued
cascading of this programme now incorporated into the corporate training
calendar and delivered internally. Whilst some other elements of the
programme were delivered, progress was hampered by the response to the
Covid pandemic. 
3.5 However, a number of elements were taken forward and have now become
core to the corporate training programme including, for example, project
management skills and development. In addition, the Leadership Forum runs
quarterly and is key to cascading corporate priorities and shared leadership
experience. 
3.6 Prior to 2019/2020, the Council delivered a programme based on academic,
certificated courses including the Public Sector Leadership Certificate
delivered by UHI and Napier University. 
3.7 Some service specific leadership development is currently in place, in
particular within Education but also in other services where there are
professional standards and development plans in place to support
professional development. 
3.8 Whilst there will be elements, particularly in relation to general leadership
principles and expectations that will be common across service specific
interventions, it is considered that there are, in addition, leadership
expectations that are relevant to whole system council wide leadership from
an organisational perspective and required of leaders across all services,
ensuring a consistent approach.   
3.9 Individual development plans will be used to support leaders in their personal
professional development against the expectations and what is required from
both a professional leadership perspective and from a whole organisation
perspective.
Page 76

Page 77

4. Indicative Leadership Development Strategy and Plan 
4.1 The indicative Leadership Development Strategy (Appendix 1) is attached to
this report and the outline Plan is available as a background paper. 
4.2 The indicative Leadership Development Strategy outlines an approach to
leadership development in the Council.   This is to ensure that leaders are
equipped to enable modernisation, improvement, transformation and change
towards a future operating model that is sustainable and ensures positive
outcomes for the communities of Moray.   It is also important that the leadership
development activity links closely with and aligns to the collaborative leadership
approach that has been agreed for Elected Members and Senior Officers. 
4.3 The indicative Leadership Development Plan supports delivery of the Strategy,
outlining the pathways and interventions to ensure that leaders are developed to
deliver the Council’s vision and priorities, whilst upholding the Council’s values,
working together in a collective and collaborative way across the organisation
and with partners. 
4.4 Leadership competencies are in an early draft and will be developed further in
collaboration with the Council leadership team as part of the next stage of
development.  The proposed approach uses a matrix to ensure alignment of
required competencies with the learning and development interventions which
will form the leadership development programme. 
4.5 The current senior management appraisal framework will also be reviewed to
align with the indicative approach and the competencies required. It is also
intended that the revised review framework will be developed to include a tool to
enable a 360-degree feedback element along with self and manager
assessment to ensure appropriate monitoring of impact and ongoing support
and development for existing and future leaders. 
4.6 In addition, measures of planned outcomes, including monitoring annual
progress, key learning points and skills, measured by a skills analysis survey
will be implemented. 
4.7 The outcomes from the corporate management review, due to be reported in
February 2025 need to be considered in taking the work on leadership
development forward and some of the references in the indicative strategy and
plan will require refinement depending on these outcomes. 
4.8 In addition, it is important that there is the opportunity for the new permanent
Chief Executive to consider what they want from the leadership team in Moray
and the approach they would want to take to leadership development in light of
this. Thus, the indicative nature of the approach outlined in this report and the
supporting documentation.   
4.9 However, it is recognised that there are areas where work could be taken
forward to support leaders in the short term whilst the longer-term approach is
reviewed and considered, given both the corporate management review
outcomes and the appointment of the new permanent Chief Executive.
Page 77

Page 78

Therefore, the approach to leadership development has been broken up into a
number of phases to enable progress while taking account of imminent changes
for the organisation and its leadership.  These are set out at Section 5 below
and Committee is invited to provide feedback and guidance to inform the next
stage of this work. 
5. PHASED APPROACH TO DELIVERY 
5.1 Recognising the current situation as outlined above, where the outcomes from
the corporate management structure review are pending, the Council has
appointed a new permanent Chief Executive, and the indicative strategy to
implement the approach in stages, it is recommended that a phased approach
to delivery is taken, both in the short and long term. 
Short Term - Introductory Phase 1 (January – June 2025)
5.2 Focus on Inspiration to motivate and drive the officers in leadership roles: 
source inspirational speakers as a soft start using the leadership forum cohort,
with a programme developed including short high impact sessions. 
5.3 Establish Baseline: individual Continuing Professional Development for leaders
– establish training needs and support to then coach further development
based on individual leadership requirements to meet organisational and job
needs. 
Longer Term: Phase 2 (June 2025 onwards)
5.4 Take account of the impact of the outcomes from the corporate management
structure review, the new permanent chief executives’ views and approach and
plan the next stage of development. This will include consideration of the
indicative approach outlined below and in the attached documentation. 
Scope and Prioritisation
5.5 The initial focus of delivery of the strategy is development of the current Senior
Leadership team encompassing the Extended Corporate Management Team
(ECMT) as this was deemed a priority for the Council in the work undertaken
last year by external advisers to the Council, particularly around teambuilding.
This has led to consideration of provision which takes a holistic approach to
development encompassing the collective and collaborative approach, strategic
learning and cultural change. 
5.6 However, reference is also made to other elements required of a Council wide
Leadership Development Strategy.  This will include consideration of the links
to the work that is being undertaken on succession planning in order to identify
and provide a pathway for future senior leaders and maximise existing learning
and development programmes across the organisation.   
5.7 It is important that the learning and themes from development at ECMT level
are cascaded through the organisation and that the existing programme of is
reviewed and updated to ensure alignment with the core themes,
competencies, skills and behaviours that are required.  Currently over 40 3rd
and 4th tier managers have attended the current provision of development
activity with further cohorts planned. 
Page 78

Page 79

5.8 Development work will be required to create a Leadership Hub where a range
of resources can be held in an accessible way, that provides learner driven,
short, just in time learning interventions that leaders and aspiring leaders can
tailor to their needs. This will support the planned, programmed courses and
interventions outlined. 
6. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)
Developing leadership capacity is critical to the delivery of the priorities in
the corporate plan. 
(b) Policy and Legal
None from this report. 
(c) Financial implications
The costs for the implementation of Phase 1 will be contained within the
corporate training budget. 
(d) Risk Implications
There is a risk that if there is no investment in and progress with
developing leadership capacity that there will be limited scope and
opportunity to provide the strategic and organisational capacity required
to develop the agenda for and direction of the organisation. 
(e) Staffing Implications
The work will require to be absorbed within the existing OD resource.
There will be implications for those participating in the programme which
will require their commitment in terms of time and resource to fully
participate and reap the intended benefits. 
(f) Property
None 
(g) Equalities/Socio Economic Impact
None arising directly from this report. 
(h) Climate Change and Biodiversity Impacts
None. 
(i) Consultations
Consultation has taken place with ECMT and the Democratic Services
Manager and will be undertaken with Trade Union representatives
should Committee support the indicative approach. 
7. CONCLUSION 
7.1 The indicative Leadership Development Strategy is reported for
consideration. This is critical to addressing corporate and individual
leadership needs to ensure that leaders are developed to lead the
response to the challenging agenda, the Council is prepared for the
Page 79

Page 80

future and makes sustained progress in its improvement and
transformation work. 
7.2 Recognising the current situation where the outcomes from the
corporate management structure review are pending and the new
permanent Chief Executive is due to take up post in Spring 2025, a
phased approach to delivery as outlined in the report is recommended. 
Author of Report: Frances Garrow
Background Papers: Outline Development Activity Delivery Plan – SPMAN-
1656699058-273 
Best Value in Moray Council – SPMAN-1108985784-972 
Best Value Action Plan 
Best Value Thematic 2023/24 – SPMAN-1108985784-
1013 
Best Value: Revised Statutory Guidance 2020 
Ref: SPMAN-1656699058-271 
Page 80

Page 81

1 
Appendix 1 
Leadership Development Indicative Strategy and Plan (2024 – 2027) 
1 Introduction
1.1 This Indicative Leadership Development Strategy outlines the approach to leadership
development in Moray Council to address corporate and individual leadership needs.  
It aims to ensure that leaders are equipped to lead and enable modernisation,
improvement, transformation and change leading to positive outcomes for the
communities of Moray.  
1.2 The Strategy adopts a phased approach pending the output of the corporate
management structure review and input from the new Chief Executive from mid-
March but references elements required of a Council wide Leadership Development
Strategy.
2 Corporate Plan (2024-2029)
2.1 The Strategy outlines the high-level approach aligns with the Council’s vision, values
and priorities.
3 Workforce and Organisational Development Strategy (2024-2027)
3.1 One of the main workforce priorities outlined in the Workforce and Organisational
Development Strategy (2024-2027) is developing leadership capacity to prepare and
develop strong and visible current and future leaders to provide the strategic and
organisational capacity to develop the agenda for and direction of the organisation.
3.2 The Leadership Development Strategy and Plan (2024-2027) is designed to: 
o Establish a leadership development programme to address corporate and
individual leadership needs including collaborative and distributed leadership,
o Develop collaborative leadership skills required to support transformation,
o Cascade a programme of leadership development activity that enables and
empowers strong visible leadership across the organisation.
4 Aims and Objectives of the Leadership Development Strategy
4.1 Aims
To develop distributive, collaborative and adaptive leadership that fosters and
enables a culture of transformation and change, innovation and strategic decision
making along with the provision of high quality services to the communities of Moray.
Leaders are developed to lead the challenging agenda with feedback on positive
impact made, measured by skills analysis surveys at key points to illustrate
development and appraisals with a 360-degree element to capture personal growth
and impact 
4.2 Objectives
To outline the desired leadership culture required to be developed to deliver the aims
of the strategy, with a focus on a collaborative, collective and partnership approach.
Item 10.
Page 81

Page 82

2 
To ensure a clear framework and understanding of the skills and behaviours required
to deliver the desired leadership culture.
To outline the development activity required to develop the skills and behaviours
required and allow the desired leadership culture to develop.
To have a range of leadership development activity in place across management
tiers, using a blended approach to delivery.
To take a phased approach to delivery with the initial focus on senior leaders (i.e.
Extended Corporate Management Team (ECMT)) before targeted activity being
cascaded further across third tier (service managers, Head Teachers) and beyond.
5 Leadership Target Audience
5.1 Priority will be given to ECMT in the first instance with further development cascaded
through further tiers of the workforce.
Phase 1: ECMT
Phase 2: 3rd tier service managers, Head Teachers and Depute Head Teachers
Phase 3: First Line Managers and Supervisors
6  Leadership Culture
6.1 In order to ensure the development of a culture of transformation and change,
innovation and strategic decision making, leadership practices need to be embedded
into the mindset and practice of leaders across the organisation. The interactions of
leaders, stakeholders, communities and the workforce must be developed from the
shared values, beliefs, attitudes and behaviours of leaders and brought to life in the
daily interactions and relationships across the organisation.
6.2 This includes making appropriate links between the collaborative leadership
developments that are in train between the Elected Members and senior managers.
7 Skills and Behaviours 
7.1 The skills and behaviours needed to implement and deliver the Council’s priorities
and develop the required culture are as follows:
• Empowering and fostering innovation
• Strategic decision making and understanding of systems thinking
• Managing Change and Empowering Teams
• Ensuring robust financial management and accountability
• Building strong and effective relationships built on trust, respect and kindness.
• Ensuring wellbeing
8 Collective Capabilities
8.1 In addition to the above, to ensure that leaders can effectively collaborate across
boundaries, the following is required:
• Working positively with communities and partners through a collective and
collaborative approach
• Ensuring equality, diversity and inclusion across the organisation and beyond.
Page 82

Page 83

3 
• Developing digital transformation across services and across the
organisation.
• A collective approach to climate change.
9 Development Activity  
9.1 In order to develop the required skills, behaviours and capabilities, development
activity will centre on the following areas:
• Driving change, improvement and transformation through collaboration and
engagement
• Normalising peer review and challenge
• Empowering others (distributive leadership), 
• Working across boundaries, taking a collective and collaborative approach
• Instilling a learning mindset and approach, 
• Engendering psychological safety, 
• Developing, nurturing talent, 
• Coaching approach.
9.2 The Leadership Development Plan includes a range of interventions including
accredited programmes of study, short courses, self-directed learning, bitesize
learning opportunities and a library of resources for leaders to draw upon to support
their ongoing development. 
9.3  All leaders will undertake several core elements of the leadership development
programme to ensure a consistent approach to achieving the outcomes and
objectives.
9.4  Leaders will also have an individual development plan, based on a process including
1) self-assessment 2) appraisal by their line manager and 3) 360-degree appraisal
against the skills, behaviours and competencies required with the interventions
available mapped against these. This allows the opportunity to take account of
individual’s prior learning and development and acknowledge that leaders will be at
different stages of leadership development.
9.5 Delivery will take a blended approach, including face to face, online, digital methods
as well as self-directed learning and development activity.
10 Delivery Programme 
10.1 Core elements:
Leaders will be required to undertake the following core elements of the Leadership
Development Programme:
1) Collective and Collaborative Leadership – working across boundaries
2) Coaching approach
3) Psychological safety
10.2 Tailored elements:
In addition, leaders will also be required to undertake several tailored elements,
based on a self-assessment and appraisal process and outlined in the individual
development plan.  This will as a minimum include undertaking an accredited
leadership development programme, if one has not been undertaken previously. 
Page 83

Page 84

4 
Also included will be any role specific leadership development activity, again, if this
has not already been undertaken.
Other learning and development activity tailored to ensuring that the required
competencies are met.
11 Enablers to Delivery of Approach
Succession Planning  -  this is critical to the success of the delivery of the leadership
development approach, particularly with regard to the pathway for the leaders of the
future to develop their skills. This will be embedded through the development work
required to support the cascading of the leadership development approach from the
senior leadership cohort through to 3rd and 4th tier managers and beyond.
Review of Senior Management Appraisal Framework - also critical to success is the
review and development of the existing senior management appraisal framework, to
include 360-degree feedback and this will be an integral part of delivery of the
leadership development programme.
Funding - furthermore, there requires to be a commitment to continued investment in
leadership development, ensuring that the required funding is in place to support this
development.
12 Phased Approach to Delivery
Short Term - Introductory Phase 1 (January – June 2025)
Focus on Inspiration, sourcing inspirational speakers as a soft start using the
leadership forum cohort, with a programme developed including, for example, short
high impact sessions
Establish Baseline: individual CPD – establish training needs and support to then
coach further development based on individual needs that are clearly linked to
organisational and job requirements.
Longer Term: Phase 2 (May 2025 onwards)
Take account of the impact of the outcomes from the corporate management
structure review, the new permanent chief executives’ views and approach and plan
the next stage of development. This will include consideration of the indicative
approach outlined below and in the attached documentation.
13 Responsibilities
13.1 CMT are responsible for ensuring the delivery of the Leadership Development
Strategy and Programme of Development Activity, including that the required
investment and funding is in place.
13.2 CMT are responsible for approving applications for funded development courses
from DMTs, ensuring that the criteria for assessment are met, to maintain rigour,
fairness and costs.
13.3 The criteria for assessment will include: 
• relevance / fit for current role and anticipated future pathway
• capacity to commit from a work perspective based on other likely demands
both current and future
Page 84

Page 85

5 
• capacity to commit from a personal perspective given any additional demands
on time the course requires
• cost benefit analysis
13.4 CMT and Heads of Service are responsible for ensuring that there is an individual
development plan in place for their respective reportees aligned to the requirements
of the Leadership Development Strategy and Delivery Plan as well as taking account
of needs arising from the application of the talent management and succession
planning approach to their respective service areas.
13.5  Head of HR, ICT and OD is responsible for ensuring that the necessary
arrangements are in place to facilitate the delivery of the core and tailored elements
of the learning and development interventions to support delivery of the Leadership
Development Strategy.
13.6 Head of HR, ICT and OD is responsible for ensuring a planned approach to delivery
with a review every 6 months reporting to CMT on progress including the activity that
has taken place with details of participants, highlighting any issues of concern,
including whether there are any additional pressures, for example, on funding,
participation levels. 
14 Evaluation
14.1 Evaluation of the success and impact of the leadership development activity will
include the following outcome measures:
• Leadership development courses in place for corporate and education
environments.
• 80% Senior and Service Managers and Head Teachers have undertaken
leadership development training over the course of each relevant year (i.e.
financial or academic). 
• Improvements in awareness of key learning points demonstrated (measured
through skills analysis survey) with baseline established in Year 1 and a 10%
improvement in Year 2.
• 10% improvement in employee survey results.
• Rating of confidence as a leader before and after the learning and
development activity. 
Organisational Development (updated January 2025) 
Page 85

Page 86

Page 86

Page 87

REPORT TO: CORPORATE COMMITTEE ON 28 JANUARY 2025 
SUBJECT: UPDATED CLOSED CIRCUIT TELEVISION POLICY VERSION 2.0
REPORT 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISTIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To request the Committee to consider and approve an updated Council wide
Closed Circuit Television (CCTV) Policy v2.0. 
1.2 This report is submitted to Committee in terms of Section III (B) (40) of the
Council's Scheme of Administration relating to ensuring suitable framework is
in place for performance management across the Council. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee considers and approves the
updated CCTV Policy as set out in APPENDIX 1 and summarised in
Section 4 below. 
3. BACKGROUND 
3.1 The Council’s CCTV Policy was approved at Corporate Committee on 23 April
2024 (para 12 of the minute refers). It has now been expanded to include
other systems similar to CCTV, such as Body Worn Cameras (BWCs),
Automatic Number Plate Recognition (ANPR), Dash Cams and door video
intercoms. 
3.2 The Council must ensure that footage captured by these additional systems
are managed in accordance with legislation, including Human Rights
Legislation and Data Protection Legislation. 
3.3 This updated Policy aims to bring a unified approach and standardise
governance to improve the existing management of CCTV and other such
systems across the Council. 
4. HIGHLIGHTS FROM THE COUNCIL’S CCTV POLICY VERSION 2.0 
4.1 The CCTV Policy version 2.0 applies to all Council employees and all third
party providers acting on behalf of the Council. It ensures that all Council
Item 11.
Page 87

Page 88

employees and contractors will be aware of their obligations in relation to the
data captured on CCTV and similar systems including BWCs, ANPRs, dash
cams and suchlike. The Policy endeavours to cover the Council’s current
situation, aims to clarify and define roles and responsibilities in the use of
these systems, and standardise governance elements, including: 
• A stated requirement that staff training is provided 
• A stated requirement that procedures are in place verifying how each
system will be accessed, monitored and the data shared; all training within
service operating procedures should also include training on the Human
Rights Act 1998 with regard to Article 8 in particular and the requirements
of RIPSA
• A stated requirement for Services to review operating procedures annually
• A stated requirement that footage captured will comply with the Council’s
Retention Schedules, with service operating procedures specifying the
particular retention cycles applicable to each system   
4.2 Services responsible for the operation of such a system will also need to: 
• Complete a Data Protection Impact Assessment (DPIA), to ensure that
Data Protection risks have been identified and mitigated
• Ensure that signage is sufficient, clear and prominently placed, and,
Privacy Notices are accessible and accurate 
• Maintain detailed records when disclosing footage to third parties
• There are up-to-date procedures for each system, with staff trained and
aware of the requirements. 
4.3 Captured footage should not be disclosed to any third party, unless there is a
lawful basis to do so. Requests regarding the sharing of footage will be
handled in the same manner as requests for personal data and will generally
require the submission of a completed Data Protection Release Request form;
setting out the data requested and the legal basis for disclosure, before any
personal data can be released. 
4.4 Captured footage may also be subject to release through Subject Access
Requests, under Data Protection legislation. These requests will be processed
as per the current centralised method, with stills of videos and transcripts of
audio considered to allow for suitable redaction. Subject Access Requests for
images captured on Public Space CCTV must be made directly to Police
Scotland. 
4.5 The Council is utilising newer technologies, and this Policy places
standardised requirements on departments to have good governance,
including training and operational procedures in place on the use of these new
systems. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
None 
Page 88

Page 89

(b) Policy and Legal
None 
(c) Financial implications
There are no financial implications arising from this report, however the
promotion and implementation of effective CCTV governance impacts
positively on the Council’s ability to mitigate its exposure to financial risk,
particularly monetary penalties levied by the Information Commissioner’s
Office (ICO) for data breaches. For serious breaches of Data Protection
legislation the ICO have the power to issue fines of up to £17.5 million. 
(d) Risk Implications
None 
(e) Staffing Implications
None 
(f) Property
None 
(g) Equalities/Socio Economic Impact
None 
(h) Climate Change and Biodiversity Impacts
None 
(i) Consultations
The Depute Chief Executive (Education, Communities and
Organisational Development), Head of Governance, Strategy and
Performance and, the Council’s Information Assurance Group, as well as
Property Services, Head of Economic Growth and Development,
Education Estates and Democratic Services Manager have all been
consulted and their comments have been incorporated within the Policy. 
5. CONCLUSION 
5.1 The updated CCTV Policy is required to ensure good governance is in
place for the consistent management of footage captured by CCTV and
similar systems, and, for the relevant equipment.  
5.2 The Committee is asked to approve the attached CCTV Policy v2.0. 
Author of Report: Alison Morris, Information Governance Manager & DPO
Background Papers: Appendix 1: CCTV Policy v2.0
Ref:             SPMAN-2045703626-551
Page 89

Page 90

Page 90

Page 91

Dec 2024 v2.0  Page 1 of 15 
Closed Circuit Television
(CCTV) Policy 
December 2024 
Version 2.0 
Item 11.
Page 91

Page 92

Dec 2024 v2.0  Page 2 of 15 
Document Control Sheet 
Title Closed Circuit Television (CCTV) Policy
Author Information Governance Team
Consultees Economic Growth & Development
Educational Estates
Education, Resources and Communities
Equalities
Estates and Property Services 
Information Assurance Group
Distribution Council wide upon approval
Version v1.0 v2.0    
Date Mar 2024 Dec 2024     
Contents
1 Introduction ................................................................................................................ 5
2 Purpose of CCTV Systems and BWCs ...................................................................... 6
3 Legislation and Guidance ........................................................................................... 6
4 Principles ................................................................................................................... 7
5 Responsibilities – Existing Systems ........................................................................... 9
6 Central Register of CCTV Systems ...........................................................................10
7 Information Management ..........................................................................................11
8 Operational Use of CCTV and similar systems .........................................................11
9 Installation/extension of new/existing CCTV and similar systems .............................12
10 Review, sharing and transfer of captured data ..........................................................12
11 Individual requests for access to or erasure of captured data ...................................13
12 Review of Systems ....................................................................................................13
13 Joint systems ............................................................................................................13
14 Complaints ................................................................................................................14
15 Privacy Notices and Signage ....................................................................................14
16 Similar Systems ........................................................................................................14
17 Further Information ....................................................................................................15 
Page 92

Page 93

Dec 2024 v2.0  Page 3 of 15 
1 Definitions: 
Body Worn Cameras: Body Worn Cameras (BWC) are worn by a person, often attached on to the
front of the person’s uniform or clothing. These cameras are usually able to record both visual and
audio data, often in close proximity.
CCTV/CCTV Systems: Closed Circuit Television (CCTV) is a closed system consisting of video
cameras, display devices (monitors) and wired or wireless data networks that allow the transfer of
images from video cameras to monitors. There may be the capability for captured images to be
recorded.
Data Controller: A body that determines the purposes and means of the processing of personal data.
A data controller can act either jointly or alone. The Council is considered to be the data controller for
most of its activities that involve personal data.
Data Processor: A body that processes personal data on behalf of and as specified by the data
controller. Data Controllers must have a contract in place with all Data Processors they utilise (known
as Data Processing Agreements).
Data Protection Legislation: means as applicable, the Data Protection Act (DPA) 2018, the United
Kingdom General Data Protection Regulation (UK GDPR) (as defined in the DPA 2018) as it forms
part of the law of England and Wales, Scotland and Northern Ireland by virtue of section 3 of the
European Union (Withdrawal) Act 2018, and as amended by the Data Protection, Privacy and
Electronic Communications (Amendments etc) (EU Exit) Regulations 2019, and, the Privacy and
Electronic Communications (EC Directive) Regulations 2003 and any other applicable laws and
regulations relating to the privacy or the processing of personal data, including any amendments or
successor laws or regulations thereto. It also includes if applicable, legally binding guidance and
codes of practice issued by the Information Commissioner.
Data Subject: An identified or identifiable living individual to whom personal data relates.
Data Subject Rights: Rights belonging to data subjects under data protection legislation namely: the
right to be informed, the right of access, the right to object, the right to erasure, the right to restriction
of processing, the right to rectification, the right to file a complaint, the right to damages, the right to
data portability, and, rights relating to automated decision making and profiling.
Personal Data: Information relating to an identified or identifiable natural person (data subject) who:
can be identified or who is  identifiable, directly from the information in question; or who can be
indirectly identified from that information in combination with other information; such as: a name, an
identification number, location data, an online identifier; or one or more factors specific to the physical,
physiological, genetic, mental, economic, cultural or social identity of that natural person. Personal
data may also include special categories of personal data or criminal offence data.
Special Category Data: Personal data that reveals:
• racial or ethnic origin; 
• political opinions;  
• religious or philosophical beliefs; 
• trade union membership; 
• genetic data; 
Page 93

Page 94

Dec 2024 v2.0  Page 4 of 15 
• biometric data (where used for identification purposes); 
• data concerning health; 
• data concerning a person’s sex life; 
• data concerning a person’s sexual orientation.
Criminal Offence Data: Personal data relating to criminal convictions and offences or related security
measures. This includes data about offenders or suspected offenders in the context of criminal
activity, allegations, investigations and proceedings. 
Processing: Any operation or set of operations performed on personal data, whether or not by
automated means, such as collection, recording, organisation, structuring, storage, adaption or
alteration, retrieval, consultation, use, disclosure by transmission, dissemination or otherwise making
available, alignment or combination, restriction, erasure or destruction.
Data Protection Impact Assessment (DPIA): A DPIA is a process designed to help systematically
analyse, identify and minimise the data protection risks of a project or plan. It is a key part of
accountability obligations under the UK GDPR and helps demonstrates compliance with data
protection obligations.
Privacy Notice: A Privacy Notice is required to clearly inform Data Subjects on what will happen to
the personal data once collected for a set process. Privacy Notices for the Council are produced by
the Information Governance Team.
Central Register of CCTV systems (CCTV Register): A central register of only CCTV systems will
be maintained by Property Services.  
Page 94

Page 95

Dec 2024 v2.0  Page 5 of 15 
1 Introduction 
1.1 The Council uses Closed Circuit Television (CCTV) in a range of spaces, including public
spaces, Council buildings and properties, and schools. The Council also utilises similar systems
to CCTV, in particular Body Worn Cameras (BWCs) as well as Automatic Number Plate
Recognition (ANPR) camera systems, Dash Cams and Intercom entrance systems.
1.2 BWCs involves the use of cameras capable of recording both visual and audio, that are worn
by a person and often attached onto the front of clothing or a uniform. BWC footage and audio
can be captured in close proximity to individuals and can be used to record in new or novel
ways. Such footage can therefore be much more privacy intrusive than conventional CCTV
systems. Use of such systems must be justified to be necessary, proportionate and required in
order to address a particular need. This justification is amplified if use of BWCs that record both
audio and visual data is proposed. From August 2024 BWCs have been approved for use within
one Council Service.
1.3 This document sets out the Council’s policy on the use of CCTV and similar systems to ensure
that the Council acts appropriately when gathering, storing and sharing information from the use
of these systems. It also aims to maintain public confidence in the use of CCTV and similar
systems by striking the right balance between the expectation of privacy by people going about
their ordinary business, even in a public space, and, the public interests being served by the
systems.
1.4 Further guidance must be produced by Services when they are responsible for the operation of
a CCTV or similar system, such as detailed operating procedures. Operating procedures will
provide practical information on how CCTV and similar systems are to be used in each area.
These procedures should include, as necessary, roles and responsibilities for each system,
assessments and processes to be carried out for siting of equipment, training and training
records for operators, procedures for use, review records of camera siting and usage,
partnership arrangements (as required), and, processes for retention and access to recorded
data. Operating procedures as well as camera siting and usage should be reviewed annually to
ensure they remain relevant and fit for purpose. 
1.5 This Policy relates to the installation, use and management of equipment for CCTV and similar
systems, the gathering and storage of recorded data, and, data disposal/transfer. This Policy
applies to all Moray Council employees and all third party providers acting on behalf of the
Council.
1.6 For the purposes of this policy, the gathering of data means:
• images of individuals or people. This is regardless of whether this was the intended primary
purpose of the system. It should be noted that this includes images of Council employees as
well as members of the public, even if the system only captures images from within Council
premises or land.
• images containing information that when combined with other information could identify
individuals, such as an individual driving a vehicle and the vehicle’s registration number plate.
• For BWCs and similar systems; this may also mean the gathering of audio of individuals or
people. 
1.7 This Policy does not cover:
Page 95

Page 96

Dec 2024 v2.0  Page 6 of 15 
1. the capture of audio by CCTV; no audio will be captured by the Council’s CCTV systems.
However, this Policy does cover the audio that will be captured by BWCs and similar
systems.
2. Public Space CCTV cameras. These are owned and maintained by the Council, and are
monitored and operated by Police Scotland.
3. the use of equipment as part of any covert surveillance operation that has been authorised
in terms of the Regulation of Investigatory Powers (Scotland) Act 2000 (RIPSA) as these
operations are subject to a separate procedure.
Note:- CCTV and similar systems must not be used covertly, or used for monitoring a specific
individual or individuals (directed Surveillance) without specific authorisation under RIPSA.
RIPSA should be included in CCTV and similar systems training so staff have an appropriate
awareness of the requirements of RIPSA. 
1.8 This Policy should be read in conjunction with other Council Policies, including on Data
Protection and Information Security, and any related procedures, instructions or guidance
issued by the Council in connection with those policies. Whilst it is the ultimate responsibility of
the Council to ensure compliance with data protection matters, in line with those policies, the
relevant service is responsible for ensuring that the use of their CCTV and similar systems
complies with the operational requirements of this policy.
1.9 This policy should also be read in conjunction with the associated operating procedures issued
by Services and any failure to comply with these documents could result in serious
consequences for members of the public, individual employees and the Council.
2 Purpose of CCTV and similar systems
2.1 It is important that all employees and especially those charged with operating CCTV and similar
systems on behalf of the Council understand exactly why each system has been introduced and
what the equipment will, and will not, be used for. 
2.2 CCTV and similar systems may be used for the following purposes:
• promoting and supporting community safety
• preventing and detecting crime
• protecting Council property and assets
• creating and supporting a safe environment for employees and the public within
Council properties and in public areas
• combating and reducing anti-social behaviour
• traffic management.
2.3 New or additional purposes will be reviewed on a case-by-case basis, as and when a new need
arises. In such instances, the relevant Data Protection Impact Assessment (DPIA) would require
updating, in addition to, each register of cameras.
3 Legislation and Guidance
3.1 The Council recognises its legal obligations in operating CCTV and similar systems, and, the
rights and freedoms of individuals who may be captured by these systems. Footage captured
by CCTV and similar systems is personal data and must be handled in the same way as any
other personal data collected by the Council. The Council is committed to operating CCTV and
similar systems in compliance with legal frameworks.
Page 96

Page 97

Dec 2024 v2.0  Page 7 of 15 
3.2  In addition to Council Policies and procedures, the operation and use of CCTV and similar
systems are subject to legislative obligations, such as under:
• Data Protection Legislation, including:
o The Data Protection Act 2018 (DPA)
o The UK General Data Protection Regulation (UK GDPR)   
• The Human Rights Act 1998 (HRA) in particular Article 8 (the right to respect for private
and family life) provides that; (1) everyone has the right to respect for his private and
family life, his home and his correspondence and (2) there shall be no interference by
a public authority with the exercise of this right except such as is in accordance with the
law and is necessary in a democratic society in the interests of national security, public
safety or the economic well-being of the country, for the prevention of disorder or crime,
for the protection of health or morals, or for the protection of the rights and freedoms of
others. 
• Freedom of Information (Scotland) Act 2002 
• The Regulation of Investigatory Powers (Scotland) Act 2000 (RIPSA)
Consideration must be given as to whether the use of CCTV and similar systems is necessary,
proportionate and in compliance with legislative requirements, in both their application and
purpose. 
3.3   The Council will comply with the Scottish Government’s National Strategy for Public Space
CCTV in Scotland (2011) that sets out a common set of principles that owners and operators of
public space CCTV systems in Scotland should follow to ensure that these systems are
operated lawfully and fairly. 
3.4 The Information Commissioner’s Office (ICO) regulates compliance with UK Data Protection
legislation. The Council is registered with the ICO. The ICO have produced Guidance on Video
Surveillance. 
3.5  To ensure that CCTV and similar systems are operating in an appropriate manner, in
compliance with data protection legislation and that all practices and procedures are relevant,
the Council reviews all CCTV and similar systems documentation on a regular basis. 
3.5.1  Services should review all operating procedures annually. This includes a review of
sitings, usage and staff procedures to determine if equipment is still required and/or if
a DPIA needs updating with any significant changes.
4 Principles
4.1 The Council will comply with the following principles when installing and operating CCTV:
4.1.1 CCTV systems will only be installed and operated when there is a clearly identified
need and a legal basis for their use. The processing must be necessary and
proportionate.  Evidence of this will be gathered, reviewed and retained for future audit
and reference. 
4.1.2 Data protection by design and by default will be a key consideration when new CCTV
systems are acquired, or changes introduced to current systems.
4.1.3 A Data Protection Impact Assessment (DPIA) must be completed by services, and,
approved before CCTV systems can be installed and operated.
Page 97

Page 98

Dec 2024 v2.0  Page 8 of 15 
4.1.4 Services must have operational procedures in place prior to utilising any new CCTV
systems. All CCTV systems will be operated in accordance with documented
operational procedures in which responsibilities will be clear, and effectively
communicated to all relevant employees. 
4.1.5 The location of CCTV systems must ensure that only necessary areas are captured by
CCTV, to minimise the capture of areas not relevant to the purposes of the CCTV
installation, for example private homes, neighbouring properties and areas where staff
are working (where possible).
4.1.6 CCTV systems will not record audio. 
4.1.7  CCTV systems will only capture images of a suitable quality for the purposes for 
which the systems have been installed.
4.1.8 The Council has an obligation under data protection legislation to process personal
data securely by means of appropriate technical and organisational measures.
Services will ensure that controls are implemented to restrict access and use of
captured images to authorised personnel only. 
4.1.9 Clear signage will be put in place to inform individuals that they are in an area where
CCTV is in operation, with a link to a Privacy Notice available on the Council’s 
website.
4.1.10 Measures should be put in place to protect CCTV systems from vandalism.
4.1.11 All images captured will be retained for the minimum amount of time necessary for the
purpose(s) that the CCTV systems have been installed for, and, comply with the
Council’s Retention Schedules. Service operating procedures should clearly specify
the particular retention applicable to each CCTV system. 
4.2 The Council will comply with the following principles when operating BWCs and similar systems: 
4.2.1 BWCs and similar systems will only be procured and deployed when there is a clearly
identified need and a legal basis for their use. The collection and processing of images
and audio must be necessary and proportionate. Evidence of this will be gathered,
reviewed and retained for future audit and reference. 
4.2.2 Data protection by design and by default will be a key consideration when new
equipment is acquired, or changes are introduced to current systems.
4.2.3 A DPIA must be completed by Services, and, approved by the Council’s Information
Governance Team before equipment can be procured and deployed.
4.2.4 Services must have operational procedures in place prior to deploying any existing and
any new equipment. All BWCs and similar systems will be operated in accordance with
documented operational procedures in which responsibilities will be clear, and
effectively communicated to all relevant employees. 
4.2.5 Services must ensure that there is justification for the use of BWCs and similar
systems, and, that the intrusive nature of the equipment is considered. Only the
minimum amount of data should be captured and processed, recording should not be
Page 98

Page 99

Dec 2024 v2.0  Page 9 of 15 
excessive, for example BWCs should be switched off when staff are completing a
different task, including having a tea break in a work office.
4.2.6 BWCs and similar systems will record audio; this will be highlighted to individuals, for
example when they approach a member of staff wearing a BWC in operation.
4.2.7  BWCs and similar systems will only capture images and audio of a suitable quality for
the purposes for which the systems have been procured and deployed.
4.2.8 The Council has an obligation under data protection legislation to process personal
data securely by means of appropriate technical and organisational measures.
Services will ensure that controls are implemented to restrict access and use of
captured images and audio to authorised personnel only.
4.2.9 Clear signage will be put in place to inform individuals that they are in an area where
BWCs or similar systems are in operation, this could be by:
• a link to a Privacy Notice available on the Council’s website,
• informing or verbally announcing to individuals that the recording of video or audio
or both is about to take place, and the reasons why, prior to turning on the
equipment,
• placing visible signage or a warning light on the equipment, to indicate that the
device is switched on and recording, or,
• if more appropriate in the circumstances, direct individuals to the privacy notice on
the website.
4.2.10 Measures should be put in place to protect equipment from vandalism and theft; there
should be an access log maintained with portable equipment housed in locked
cupboards when not in use.
4.2.11 All images and audio captured will be retained for the minimum amount of time
necessary for the purpose(s) that the equipment was procured and deployed for, and,
comply with the Council’s Retention Schedules. Service operating procedures should
clearly specify the particular retention applicable to each process. 
5 Responsibilities – Existing Systems
5.1 A DPIA is required for each process that collects personal data. This is required before any
personal data is collected and is a method by which the Council demonstrates it is aware of,
and complying with, its data protection obligations.  A DPIA is needed per collection process;
for example; a CCTV collection process may cover more than one physical camera or location.
5.2 Retrospective DPIAs are required for existing CCTV and similar systems. It is the responsibility
of the Service responsible for the operation of a system to undertake a DPIA, and, to record the
matters considered in it and what steps have been taken to minimise intrusion into the private
lives of individuals. This DPIA must be retained, kept up to date and made available if required. 
5.3 BWCs and similar systems should only be used in extremely limited circumstances where there
is a justifiable need, given their privacy intrusive nature. They cannot be procured and deployed
by Services prior to the completion and approval of a DPIA. 
5.4 Each service shall provide the appropriate details that are to be included within the CCTV
Register, this should be done either before or upon completion of each CCTV process’ DPIA.
Page 99

Page 100

Dec 2024 v2.0  Page 10 of 15 
5.5  All CCTV and similar systems that regularly share footage outwith the Council, such as within
the Public Private Partnerships (PPP), will require an Information Sharing Protocol or Data
Processing/Sharing Agreement. These agreements will also confirm the maintenance regime
including an annual inspection and service visits.
5.6  In relation to the use of CCTV overtly in a public space, and which would capture images of
individuals, the Service should ensure that individuals are aware that they are entering an area
where CCTV systems are in operation, signage will be displayed at the entrance and within the
controlled area advising that such cameras are in operation.
5.7 As BWCs can be small or discreet, and may be recording in fast moving situations, it is
imperative that their use is suitably highlighted to individuals. Where practicable, individuals
should be verbally made aware that the recording of video and/or audio is, or is about to, take
place and the reasons why; each Service will agree a suitable form of words that will be easily
understood by individuals. Such verbal announcements should take place prior to turning on
the device. In all instances, clear signage must be displayed at sites where BWCs are to be
used. Use of the BWCs must also be clearly shown and emphasised, with staff wearing the
BWCs in a forward-facing display, visible to anyone who is being recorded. Staff wearing BWCs
should also wear identification showing that they are wearing a recording device.
5.8 Continuous recording via BWCs, or the recording of both audio and video require a strong
justification. Many BWCs have capacity to capture and control audio and video independently.
The ability to utilise and turn each on and off, and, the BWC itself off, are important
considerations and key to avoid processing irrelevant or excessive data. 
5.9 Employees of Moray Council involved in the operation of CCTV systems and BWCs will
undertake the necessary training detailed within the service operating procedures. All training
within service operating procedures should also include training on the HRA with regard to
Article 8 in particular and the requirements of RIPSA. Services must ensure training is
completed prior to operating the CCTV systems and BWCs and that training records are
maintained.
6 Central Register of CCTV Systems
6.1 In order to assist it to meet its legal obligations in relation to CCTV, the Council will maintain a
Central Register in relation to CCTV systems. 
6.2 This register shall be maintained by Property Services, specifically by the Asset Manager
(Corporate Buildings), via the Property Helpdesk (PropertyHelpdesk@moray.gov.uk), and shall
include:
• details of the service responsible for the use of that camera,
• the location of each camera/system operated by the Council (storage location in relation
to any mobile CCTV systems),
• the number of cameras that the service is responsible for,
• the purpose for each of the cameras used, 
• a link to the signed off DPIA for that process, 
• a link to the relevant Privacy Notice,
• the owner of the CCTV system; Council, external (e.g. PPP),
• the make and model of the CCTV cameras/systems,
• date of last service, and,
Page 100

Page 101

Dec 2024 v2.0  Page 11 of 15 
• date of installation.
7 Information Management  
7.1  Moray Council will, in so far as possible, ensure that all recorded data gathered by CCTV and
similar systems, which are under its control whether operated by the Council or on the Council’s
behalf, is securely stored and used only in accordance with the terms of the relevant legislation,
and, in accordance with Council policy and guidelines. 
7.2  Information Sharing Protocols, Data Sharing/Processing Agreements should be agreed with all
third parties, such as Public Private Partnerships (PPP), Police Scotland and other such parties
prior to the sharing of data and deployment of a CCTV or similar system.
7.3 CCTV systems installed within facilities operated on behalf of the Council by third party service
providers will use Moray Council policies and procedures for the management of CCTV
systems. 
7.4 CCTV systems installed by third parties, such as PPP within the PPP Schools estate will use a
common data management process that matches the Council process in relation to retention
periods, data security and the sharing of CCTV information. 
7.5 The Council’s CCTV webpage provides transparency and clarity regarding the Council’s use of
CCTV and similar systems. It should be kept up-to-date with any relevant changes:
www.moray.gov.uk/CCTV 
8 Operational Use of CCTV and similar systems 
8.1  All employees involved in the operational use of CCTV and similar systems will use the
equipment in accordance with the terms of the relevant legislation and in accordance with
Council policies and procedures.
8.2 The Council will maintain appropriate policies and procedures relating to the use and
management of CCTV and similar systems.  
8.3  Services should ensure that all involved in the operational use of CCTV and similar systems will
be trained to a standard appropriate to their use of the specific system under their control.
Training will be outlined within the service operational procedures. Training should be
completed prior to using the CCTV and similar system. 
8.4 Services should ensure that all staff using BWCs will receive full training in their use. This will
include practical use of equipment, on site/in the field operational guidance and best practice,
when to commence and cease recording, how to process recorded information securely and
safely, the legal implications of using such equipment and how to respond to any requests and
questions from the public. Such training must be completed before the use and deployment of
BWCs.
8.5  CCTV and similar systems set up to protect Council properties and other related purposes will
be configured to match the operational needs of the individual sites and will not be used in any
way that does not comply with this Policy. 
8.6 It is important that CCTV and similar systems are monitored in relation to the adequacy of the
images that are gathered in relation to its specified purposes. Similarly, BWCs and similar
systems with audio recording capabilities should also be monitored in relation to the adequacy
Page 101

Page 102

Dec 2024 v2.0  Page 12 of 15 
of the images and audio gathered for their specified purposes. If the information gathered is
inadequate for the specified purposes, then the equipment or system must not be used to gather
information to which this Policy relates.
9 Installation or extension of new or existing CCTV and similar systems 
9.1  The Council is committed to respecting people’s rights to privacy and supports the individual’s
entitlement to go about their lawful business. This is a primary consideration in the operation of
any CCTV or similar system. However, this must be balanced against the public interest of the
Council in relation to installing or extending existing CCTV and similar systems. Covert CCTV,
or similar system, will not be deployed unless it is appropriately authorised through RIPSA.
9.2  The Council will not consider the installation or extension of a CCTV and similar system as an
automatic step to address a problem and will always consider less privacy intrusive solutions.
CCTV or and similar system will only be used if it is deemed proportionate and appropriate. The
issues of interference with privacy, including necessity and proportionality of that interference
must be recorded in the DPIA. Existing DPIAs will need to be updated to cover any significant
changes including a proposed extension.
9.3 For CCTV, the service responsible for the initiative will complete a DPIA and involve the Asset
Manager (Corporate Buildings) in the process.
9.4  The Council does not encourage the use of “Dummy” or “Replica” cameras, as these give a
false sense of security.
10  Review, sharing and transfer of captured data    
10.1  No captured data, including images or audio, will be disclosed to any third party, unless there
is a lawful basis to do so. Requests regarding the transfer of captured data will be handled on
a case-by-case basis. If captured data is to be regularly shared with a third party, a relevant
Data Sharing Agreement (DSA) should be in place. A fully completed Data Protection Request
or Release Forms must be completed by the requesting third party before any information may
be shared to that third party.
10.2  Services will retained detailed records of the following information when disclosing captured
data to any third party:
• date and time of the request and of when access was allowed;
• identification of any third party who was allowed access (name and position);
• justification for access request; 
• relevant reference number of requestor e.g. Crime Reference Number 
• the data required
• whether the footage was released
• details of the captured images/audio to which access was allowed, and,
• the format the data was provided in.
10.3 Only employees that have been authorised and completed the appropriate training, will be
involved in the review and sharing of captured data.
10.4 In order to meet the public interests in using CCTV and similar systems, it may be appropriate
for the Council to transfer captured data to other third parties on reviewing the information
gathered without the necessity of the third party making a formal request to obtain a copy of the
Page 102

Page 103

Dec 2024 v2.0  Page 13 of 15 
captured data, for instance in a case of urgency or where any delay would be contrary to the
public interest. Such transfers shall only be made where permitted in terms of legislation and
relevant Council policies and procedures. Services should record that the captured data has
been shared, with whom and for what purpose in line with para 10.2 above.
10.5  Any person who misuses, misplaces, makes unauthorised copies or transfers captured data to
a third party for purposes not related to Council or lawful purposes could be liable to disciplinary
and/or criminal proceedings. 
11  Individual requests for access to or erasure of captured data
11.1 Data Protection legislation grants rights to individuals in relation to their personal data. This
includes rights to request access to, and erasure of, personal data, such as images captured
by CCTV, and, audio and images captured by BWCs. Access to Information requests, including
Subject Access Requests, Freedom of Information (Scotland) Act Requests and Environmental
Information (Scotland) Regulations Requests are coordinated through info@moray.gov.uk
11.2 The Council retains copyright in all images captured by its CCTV and similar systems. Any further
use or publication of images provided to an individual in response to an Access to Information
Request is prohibited, unless the individual obtains authorisation from the Council.
11.3 The Council is entitled to refuse access to captured images in limited circumstances, such as
where disclosure would prejudice the prevention or detection of crime, or, the prosecution of
offenders. Where captured images have been passed to Police Scotland or the Crown Office
and Procurator Fiscal Service, a Subject Access Request from an individual will be refused until
such time as the Council has been notified that no proceedings will be taken, or proceedings
have concluded.
11.4 Subject Access Requests for images on Public Space CCTV must be made directly to Police
Scotland, as they monitor and operate the Public Space CCTV system. 
12   Review of Systems
12.1 All CCTV and similar systems shall be reviewed by Services on an annual basis to ensure that
the justification for their use remains. 
12.2 The captured data shall be reviewed on a periodic basis as set out in the Service’s operating
procedures to ensure that they are still adequate and effective in relation to meeting the
purposes of the system.
13  Joint systems
13.1 There may be situations where the Council is operating a CCTV or similar system with a third
party. This would usually occur for CCTV where the premises to which the systems relate are
operated as a shared or communal facility. In those cases, the Council will not use the images
from such a system unless that use complies with the requirements of this Policy, even if the
system was not implemented by the Council.
13.2 The Council and the third party should put in place joint operational measures in order to ensure
that the Council’s use of the CCTV or similar system and the captured data complies with
legislation and this Policy.
Page 103

Page 104

Dec 2024 v2.0  Page 14 of 15 
14   Complaints 
14.1  Any complaints will be recorded and handled in accordance with the Council’s formal complaints
procedure; Services will provide assistance as and when required.
15  Privacy Notices and Signage
15.1 Privacy Notices should be made available to potential data subjects and should be kept up-to-
date: www.moray.gov.uk/PrivacyNotices 
15.2 The CCTV and similar systems Privacy Notice will be clearly accessible from the Council’s
CCTV webpage, this webpage should be included on all Council CCTV and similar systems
signage.
15.3 All CCTV and similar systems need signage to be clearly and prominently placed at the entrance
and also within the area of coverage. For portable equipment, such as BWCs, signage needs
to be visible in the area being recorded, and on the individual wearing the equipment.  
15.4 All signage should contain layered privacy information, including naming the Data Controller,
the purpose(s) for using the system, where further data protection information can be found
including a link to the full Privacy Notice, and, contact details for further information.
15.5 For portable equipment, such as BWCs, where practicable, individuals should be verbally made
aware that the recording of video and/or audio is, or is about to, take place and the reasons
why; each Service will agree a suitable form of words that will be easily understood by
individuals. Such verbal announcements should take place prior to turning on the portable
equipment. Staff wearing BWCs should also wear identification showing that they are wearing
a recording device.
16  Similar Systems
In addition to CCTV and BWCs, other developing and pre-existing technologies have the
potential to be utilised by the Council. Examples of these include:
• Automatic Number Plate Recognition (ANPR) camera systems; these can process
personal data when vehicles drive past their field of vision. They have the ability to collect
and analyse large quantities of personal data in real time (typically capturing images of
vehicles, images of each vehicle’s number plate, vehicle registration mark, and, the date,
time and location of the vehicle). 
• Dash Cams are dashboard cameras, a type of surveillance system mounted within a
vehicle. They are generally outward facing cameras that record footage of journeys
taken by the vehicle (including footage of other road users and pedestrians). They
include features such as GPS technology, audio recording and enable footage to be
saved automatically.
• Intercom entrance systems (also known as video or smart doorbells) are designed to
control access to a building by providing occupants and property owners with a means
to visually verify access requests made by visitors. They may have keypads to allow
entry access to individuals previously provided with correct passcodes. Intercom
entrance systems can capture images and sometimes audio of individuals visiting or
leaving a doorway/premises. There are novel smart versions that can also be equipped
with facial detection and recognition technologies; this Policy does not cover such smart
versions.
Page 104

Page 105

Dec 2024 v2.0  Page 15 of 15 
No equipment or system should be procured or deployed until a DPIA has been completed by
the Service, and, fully signed off as approved. This CCTV Policy will be fully applicable to all
CCTV and similar systems, even if that is a new technology not yet stipulated in this document.
17  Further Information
Moray Council’s CCTV webpage: www.moray.gov.uk/CCTV 
ICO Video Surveillance Guidance: https://ico.org.uk/for-organisations/uk-gdpr-guidance-and-
resources/cctv-and-video-surveillance/guidance-on-video-surveillance-including-cctv/ 
Scottish Government’s National Strategy for Public Space CCTV in Scotland (2011)
https://www.gov.scot/binaries/content/documents/govscot/publications/advice-and-
guidance/2011/03/national-strategy-public-space-cctv-scotland/documents/0115210-
pdf/0115210-pdf/govscot%3Adocument/0115210.pdf 
Page 105

Page 106

Page 106