Page 1

Corporate Committee
Tuesday, 05 November 2024
NOTICE IS HEREBY GIVEN that a Meeting of the Corporate Committee is to be
held at Council Chambers, Council Office, High Street, Elgin, IV30 1BX on
Tuesday, 05 November 2024 at 09:30.
BUSINESS
1. Sederunt
2. Declaration of Group Decisions and Members Interests *
3. Resolution
Consider, and if so decide, adopt the following resolution:
"That under Section 50A (4) and (5) of the Local Government
(Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Items 19 and 20 of
business on the grounds that it involves the likely disclosure of exempt
information of the class described in the relevant Paragraphs of Part 1
of Schedule 7A of the Act.”
4. Minutes of meeting of 27 August 2024 7 - 14
5. Written Questions **
6. Complaints Annual Report 2023-24
Report by the Depute Chief Executive (Education, Communities and
Organisational Development)
15 - 28
7. Annual Procurement Report 2023-24
Report by the Depute Chief Executive (Economy, Environment and
Finance)
29 - 50
Page 1

Page 2

8. Best Value Action Plan Monitoring Quarterly report
Report by the Depute Chief Executive (Education, Communities and
Organisational Development)
51 - 56
9. Corporate Risk Register Update
Report by the Depute Chief Executive (Education, Communities and
Organisational Development)
57 - 68
10. Property Performance Indicators Report
Report by the Depute Chief Executive (Economy, Environment and
Finance)
69 - 72
11. Performance Report - Financial Services - Period to
September 2024
Report by the Depute Chief Executive (Economy, Environment and
Finance)
73 - 78
12. Performance Report - Governance, Strategy and
Performance - Period to September 2024
Report by the Depute Chief Executive (Education, Communities and
Organisational Development)
79 - 84
13. Performance Report - HR ICT and OD - Period to
September 2024
Report by the Depute Chief Executive (Education, Communities and
Organisational Development)
85 - 90
14. Armed Forces Covenant Gold Award
Report by the Depute Chief Executive (Education, Communities and
Organisational Development)
91 - 94
15. Sustainable Development Statement
Report by the Depute Chief Executive (Economy, Environment and
Finance)
95 -
110
16. Transformation Strategy Development
Report by the Depute Chief Executive (Education, Communities and
Organisational Development)
111 -
126
17. Flag Flying Policy
Report by the Depute Chief Executive (Education, Communities and
Organisational Development)
127 -
138
Page 2

Page 3

18. Moray Gaelic Language Plan
Report by the Depute Chief Executive (Education, Communities and
Organisational Development)
139 -
168
Item(s) which the Committee may wish to consider with
the Press and Public excluded
19. Voluntary Severance and Voluntary Early Retirement
Applications [Para 1]
• 1. Information relating to staffing matters;
20. Property Transaction - March Road East Buckie [Para 6
8 9]
• 6. Information relating to the financial or business affairs of any
particular person(s);
• 8 & 9. Information on proposed terms and/or expenditure to be
incurred by the Authority;
Summary of Corporate Services Committee functions:
To regulate, manage and monitor the finances of the Council both
capital and revenue; to deal with staffing policies and practices other
than for teaching staff; to deal with equal opportunities policies and
practices; to deal with procurement policies and priorities; to deal with
all matters relating to the Council’s duty to initiate, maintain and
facilitate Community Planning; to ensure that the organisation,
administrative and management processes of the Council are designed
to make the most effective contribution to achieving the Council’s
objectives; to provide all central support services; to exercise the
functions of the Council in connection with the Registration of Births,
Deaths and Marriages; to deal with valuation and electoral registration
matters.
Watching the Meeting
You can watch the webcast live by going to: 
http://www.moray.gov.uk/moray_standard/page_43661.html
Webcasts are available to view for 1 year following the meeting.
You can also attend the meeting in person, if you wish to do so,
please come to the High Street entrance door and a member of
staff will be let into the building.
Page 3

Page 4

Page 4

Page 5

GUIDANCE NOTES
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how
the individual or members of the group will vote on any item(s) of business on
the Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting.
** Written Questions - Any Member can put one written question about any
relevant and competent business within the specified remits not already on the
agenda, to the Chair provided it is received by the Proper Officer or Committee
Services by 12 noon two working days prior to the day of the meeting.  A copy
of any written answer provided by the Chair will be published on the Council’s
committee management system by 4pm the day before the meeting.  The
Member who has put the question may, after the answer has been published,
ask one supplementary question directly related to the subject matter at the
meeting, but no discussion will be allowed.
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the
consent of the Chair. If a Member does not have the opportunity to put a
supplementary question because no time remains, then he or she can submit it
in writing to the Proper Officer who will arrange for a written answer to be
provided within 7 working days.
Page 5

Page 6

MORAY COUNCIL
Corporate Committee
SEDERUNT
Councillor Bridget Mustard  (Chair)
Councillor Kathleen Robertson  (Depute Chair)
Councillor Theresa Coull  (Member)
Councillor John Cowe  (Member)
Councillor John Divers  (Member)
Councillor Amber Dunbar  (Member)
Councillor Jérémie Fernandes  (Member)
Councillor Sandy Keith  (Member)
Councillor Scott Lawrence  (Member)
Councillor Marc Macrae  (Member)
Councillor Paul McBain  (Member)
Councillor Shona Morrison  (Member)
Councillor Derek Ross  (Member)
Councillor Draeyk van der Horn  (Member)
Clerk Name: Tracey Sutherland
Clerk Telephone: 07971 879268
Clerk Email: committee.services@moray.gov.uk
Page 6

Page 7

MORAY COUNCIL
Minute of Meeting of the Corporate Committee
Tuesday, 27 August 2024
Council Chambers, Council Office, High Street, Elgin, IV30 1BX
PRESENT
Councillor Theresa Coull, Councillor John Cowe, Councillor John Divers, Councillor
Amber Dunbar, Councillor Jérémie Fernandes, Councillor Sandy Keith, Councillor
Scott Lawrence, Councillor Marc Macrae, Councillor Paul McBain, Councillor Bridget
Mustard, Councillor Kathleen Robertson, Councillor Derek Ross, Councillor Draeyk
van der Horn
APOLOGIES
Councillor Shona Morrison
IN ATTENDANCE
The Interim Chief Executive, Depute Chief Executive (Economy, Environment and
Finance), Depute Chief Executive (Education, Communities and Organisational
Development), Head of Governance, Strategy and Performance, Head of HR, ICT
and Organisational Development, Chief Financial Officer, Information Governance
Manager and the Democratic Services Manager.
1.         Chair
The meeting was chaired by Councillor Bridget Mustard.
2.         Declaration of Group Decisions and Members Interests *
In terms of Standing Orders 21 and 23 and The Councillors' Code of conduct the
Council noted that there were no declarations for Group Leaders or Spokesperson
in regard to any prior decisions taken on how members will vote on any item on the
agenda or any declarations of Member's interests in respect of any item on the
agenda.
For transparency, in relation to Item 14 "Moray British Sign Language Plan 2024-
2030" Councillor Coull stated that she was the Council's representative at North
East Sensory Services and also had a deaf child.
3.         Resolution
The meeting resolved that in terms of Section 50A (4) and (5) of the Local
Government (Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Items 10 and 11 of business on
the grounds that it involves the likely disclosure of exempt information of the class.
Item 4.
Page 7

Page 8

Para number of the minute Para Number of Schedule 7a
17
Para 1
Information on issues relating to staffing matters
4.         Minutes of meeting of 11 June 2024
Under reference to paragraph 9 of the minute, Councillor Mustard had highlighted
to the clerk a typo in the paragraph which would be corrected.
Thereafter, the minute of the meeting of Corporate Committee dated 11 June 2023
was approved subject to the correction.
5.         Written Questions
Under reference to Standing Order 36 a written question from Councillor Keith was
submitted in the following terms:
A decision was made by Moray Council to disregard engineering judgement and
council priorities on 27 March 2024 in approving the remaining £2.737m required
to fully fund the design and construction of a replacement Cloddach Bridge from
Council capital funding.
In reaching this decision other projects had to be postponed and in the case of the
New Bishopmill Bridge this decision led to it being deferred for a second year
despite engineering judgement informing council that it should proceed.
Can members be advised as to where progress on the Cloddach Bridge project
has reached and if it isn’t to proceed can a report be brought back to the relevant
committee to inform which projects should be reinstated on basis of engineering
assessment.
RESPONSE
The Council submitted the Full Business Case to the UK Government on 11 April
2024. The Department for Transport appraised the case through their governance
and approved it on 16 April 2024, then referring it to HM Treasury for funding
approval. This referral was shortly before the July 2024 UK General Election, and
consideration by HM Treasury was suspended during the pre-election period in
line with all such decisions.
The Head of Environmental and Commercial Services further contacted the Lead
Official at the Department for Transport on 26 July 2024 asking for an update
following the General Election. The advice given was that the project was to be put
back to the Secretary of State, and noting that UK parliamentary recess was due to
take place from 30 July to 2 September, a firm position would not be reached until
at least September.
Officers will continue to liaise with Officials at UK Government, and as soon as a
decision is made on the status of funding for the project this will be communicated
to all elected members, and steps taken according to the outcome of the funding
decision. If any decision of UK Government indicates any implications for the
financial position or strategic workplan for the council then this will be brought to
the appropriate meeting for consideration by councillors at the earliest opportunity.
Page 8

Page 9

6.         2023-2024 Workforce Planning Report
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing the Committee of the
progress made against the workforce strategy and plan for the period 2023-2024
and to consider the proposed workforce strategy for 2024-2027 and 2024-25
action plan.
Following consideration the Committee unanimously agreed to:
i) note the progress made against 2023-24 workforce plan;
ii) approve the proposed Workforce and Organisational Development Strategy
and Plan for 2024-27 as set out in Appendix A; and
iii) note the positive contribution from the short life Workforce Working Group.
7.         Information Governance Annual Report 2023-2024
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) which provided Committee with a
report on Information Governance activities within the Council and in particular on
improvements made for 2023/24.
Following consideration the Committee unanimously agreed to note the current
Information Governance compliance for 2023/24 as set out in the Annual Report in
Appendix 1 and summarised in Section 4.
8.         Trusts Funds Summary Expenditure 2023-24
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) which informed Committee of the disbursements made
from Trusts in 2023/24 and the estimated disposable income available for
disbursement in 2024/25.
Following consideration the Committee unanimously agreed:
i) to note the disbursements made from each of the Trust Funds in 2023/24,
shown in Appendix 1; and
ii) the estimated income available for disbursement in 2024/25, shown in
Appendix 2.
9.         Capital Plan 2024-25
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing the Committee of expenditure to 30 June
2024 under the capital plan for financial year 2024/25 and of estimates of projected
expenditure profiled into quarters.
Following consideration the Committee unanimously agreed to:
i) note expenditure to 30 June 2024 of £3,342,000 as set out in Appendix 1;
Page 9

Page 10

ii) note the projected overall expenditure for projects spanning more than one
financial year, as set out in Appendix 2;
iii) approve further amendments of £3,047,000 for 2024/25 and £110,000 for
2025/26 to the capital plan as detailed in section 5; and
iv) note progress on the review of surplus assets following an update to various
refugee and resettlement programmes.
10.         Revenue Expenditure to 30 June 2024
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) advising Committee of the revenue budget monitoring
position to 30 June 2024.
Following consideration the Committee unanimously agreed to note:
i) the budget monitoring position of £2,263,000 under budget for 2024/25 as
at 30 June 2024;
ii) that this position consists of an underspend on Devolved School budgets
within Education of £369,000, an underspend of £917,000 on
Environmental and Commercial Services, an underspend on Social Care
services and Children’s Services delivered on behalf of the Moray
Integration Joint Board (MIJB) of £1,375,000 and £103,000 respectively,
and overspends in other services of £419,000;
iii) an increase of £1,038,000 in the General Revenue Grant, as detailed in
paragraph 3.5
iv) emerging budget pressures noted in section 6 for the school catering
Fusion app;
The Committee further unanimously agreed the use of the working ear-marked
reserve of £13,000 as detailed in paragraphs 6.1 to 6.2.
11.         Best Value Action Plan Progress Report
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing the Committee of
progress against the actions set out in the Council's Best Value Action Plan since it
was approved in April 2024.
Following consideration the Committee unanimously agreed to note the progress
made against the actions in the Council's Best Value Action Plan (Appendix 1).
12.         Corporate Risk Register
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) which provided the Committee
with the quarterly overview of the Council's principal risks as detailed in the
Corporate Risk Register.
Page 10

Page 11

Following consideration the Committee unanimously agreed to approve the
overview update on the Council's principal risks as of July 2024 attached as
Appendix 1 to the report.
13.         Localisted Poverty in Moray Update
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) which informed the Committee of
the updated position of localised poverty in Moray and the actions being
progressed through Corporate and Service Planning aligned to reducing poverty.
Following consideration the Committee unanimously agreed to note the updated
position and current actions aligned to reducing poverty.
14.         Moray British Sign Language Plan 2024-2030
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) which invited the Committee
to note the feedback from the consultation on the draft Moray British Sign
Language (BSL) plan and consider and approve the amended Moray (BSL) Plan
2024-2030 (Appendix 1).
Following consideration the Committee unanimously agreed to:
i) note feedback from the consultation on the draft Moray British Sign
Language plan; and
ii) consider and approve the Moray British Sign Language (BSL) Plan 2024-
2030 (Appendix 1).
15.         Review of Second Tier Governance Documents
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) which asked the Committee to
note progress on the review of the Council's Second Tier Governance documents.
Prior to the meeting the Head of Governance, Strategy and Performance had
circulated amended wording for para 6.8 of Appendix 1 - Guidance on
Councillor/Officer Relations for approval as follows:
6.8 Officers below Head of Service level may be asked to attend group
meetings to provide simple, factual information relating to their service
expertise.  This would not normally extend below third tier.  Where the
issue:
• requires expertise of officer below third tier;
• is more sensitive or complex;
• is likely to have a significant time input;
• likely to involve differences of opinion;
then Group Leaders shall request Officer attendance through the relevant
Head of Service or CMT member.
Page 11

Page 12

Equally, should Officers below Head of Service level wish to canvas a
particular issue with a political group they shall seek the consent of the
appropriate Head of Service/CMT member.
It is important that lines of communication over attendance at group
meetings and the information provided are kept open.
Following consideration the Committee unanimously agreed:
i) the Guidance on Councillor/Officer Relations attached as Appendix 1 with
the agreed amendment;
ii) the Guidance on Councillors on Outside Bodies attached as Appendix 2;
and
iii) to note progress on the update of the Council's Second Tier Governance
Documents as detailed in paragraph 4.5.
16.         Review of Community Council Scheme and Election Arrangements
Report
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) which invited the Committee to
consider and approve the arrangements for the review of the Moray Council
Scheme for the Establishment of Community Councils and the future Community
Council elections.
Following consideration the Committee unanimously agreed:
i) the framework for the review of the Council Scheme for the Establishment of
Community Councils; and
ii) arrangements for the Community Council elections, noting financial
implications, as detailed in the report.
17.         Progress on Collaborative Leadership Development Work [Para 1]
Under reference to paragraph 6 of the minute of the meeting of this Committee
dated 4 October 2023.  The meeting had before it a report by the Interim Chief
Executive informing the Council of progress made in relation to Collaborative
Leadership, Recommendation 2 from the External Adviser's report and Action 1.1
in the Council's Best Value Action Plan.
In introducing the report, the Interim Chief Executive asked whether Committee
would be minded to defer the review as detailed in recommendation (iii) until April
2025 to allow further work to take place.
Councillor Robertson moved to defer the review until April 2025, this was
seconded by Councillor Ross.
Councillor Lawrence asked, in agreeing to defer the review until April 2025
whether an update report could be brought to Committee in December 2024.
Page 12

Page 13

In response the Chief Executive confirmed that he would be happy to bring an
update report in December 2024 as it was important to keep the work moving
forward.
Following consideration, the Committee unanimously agreed:
i) to note the progress made by the External Consultant in developing
Collaborative Leadership as detailed in Appendix 2;
ii) to note that a number of actions are proposed for different Member and
Officer groups which will take time to develop and implement;
iii) to note the Council's external adviser's proposal that a follow up assessment
is carried out by April 2025 with an update report to be brought to
Committee in December 2024;
iv) to approve the proposal for progressing and embedding collaborative
Leadership as shown in Appendix 1; and
v) the progress will be monitored through Action 1.1 in the Council's Best
Value Action Plan and will be picked up in the annual self-assessment
against Best Value guidance agreed by the Corporate Committee on 23
April 2024.
Page 13

Page 14

Page 14

Page 15

REPORT TO: CORPORATE COMMITTEE ON 5 NOVEMBER 2024
SUBJECT: COMPLAINTS ANNUAL REPORT 2023-24
BY: DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT)
1. REASON FOR REPORT
1.1 The Committee is asked to consider and note the Complaints Annual Report
2023-24.
1.2 This report is submitted to Committee in terms of Section III (A) (4) of the
Council's Scheme of Administration relating to monitoring performance in
accordance with the Council’s performance management framework.
2. RECOMMENDATION
2.1 The Committee is asked to:
i) consider and note the contents of the Complaints Annual Report;
and
ii) approve the report for submission to the Scottish Public Services
Ombudsman (SPSO).
3. BACKGROUND
3.1 All councils are required to publish their performance against the national
performance indicators set by the SPSO. The attached report presents our
performance against these performance indicators for the 2023-24 reporting
period. (Appendix 1)
3.2 Complaints handling is part of the council’s performance management
framework. Members receive updates on complaints performance through
routine reports to service committees.
3.3 Compared to the 2022-23 figures, there has been a 26% increase in the
number of complaints received demonstrating public confidence in reporting
Item 6.
Page 15

Page 16

complaints. Complaints per 1,000 population increased slightly but remains
below the national average.
3.4 During 2023-24, there was a 1% decrease to 80% of complaints dealt with at
frontline stage compared to the 20% dealt with at the investigation stage
including those escalated to investigation. The Council continues to deal with
a high percentage of complaints at frontline, as suggested by the SPSO’s
guidance on the Model Complaints Handling Procedure to “take every
opportunity to resolve service users’ complaints at the first point of contact if
at all possible.” Performance is slightly below the Scottish average of 86%
and it is intended to improve results through continued staff training,
discussions at quarterly complaint administrator meetings and with senior
officers responsible for management of their department complaints.
3.5 Average response times for dealing with stage 1 complaints has reduced to
just above the MCHP target of 5 working days. Stage 2 response times are
similar to the previous reporting year with a slight increase for escalated stage
2 complaints. Stage 2 complaints are well above the Scottish National
Average having taken significantly longer to investigate these.  That said, 10%
fewer stage 2 cases were upheld than the Scottish National Average
demonstrating that, although more time is taken to deal with complaints, the
thoroughness of investigations demonstrate that services are provided at the
required standard.  Our Complaints Officer regularly works with Complaint
Administrators to progress more complex complaints, while periodic checks of
the Complaints Management System are also undertaken to identify any
delays or issues. 
3.6 School holiday periods are not excluded when dealing with Education
complaints and these can lead to cases excessively exceeding the stage 2
time limit, particularly during the summer school holiday period.  An 11%
increase in Education complaints from the previous reporting year has
impacted on stage 2-time limits.
3.7 In 2023/24, the proportion of our Stage 1 complaints that were upheld
decreased slightly to 44% against a national average of 31%. Overall, there
was a 3% reduction (54%) of Stage 1 complaints that were upheld in some
way (upheld, partially upheld or closed as resolution) compared to 64%
nationally.
3.8 All complaints closed as resolution are scrutinised by the Complaints Officer
to ensure that they have been resulted correctly.  Such monitoring and
scrutiny does not take place in other councils.  This would account for the low
number of cases (3% for stage 1 and 2 complaints) closed at resolution
compared to the Scottish National Average of 20%. 
3.9 Only 15% of Stage 2 complaints were upheld compared to 18% nationally. 
There was a significant reduction from 54% to 37% of overall complaints dealt
with at this Stage that were either upheld, partially upheld or closed as
resolution.  This compares favourably to the national average of 47%.
Page 16

Page 17

81% of Escalated Stage 2 complaints were either upheld, partially upheld or
closed as resolution compared to a national average of 57%.  This is an
increase of 19% however the low number of cases involved (21 cases) can
artificially present as significant.    
3.10 Environmental and Commercial Services complaints have increased from
32% to 40% of all complaints received.  Housing and Property saw an 8%
reduction from 32% to 24%.  The complaints for all other departments were
similar to previous years.
3.11 The Complaints Officer is to carry out training with Environmental and
Commercial Services managers where increases in household collection,
public/school transport, winter maintenance and street lighting complaints as
detailed in Table 3 of this report will be highlighted.
3.12 Learning from complaints is essential to improve the delivery of services. 
Essentially, all complaints normally fall Essentially, all complaints normally fall
into three categories.  A complaint can be about; (a) policy or procedures in
that they are unclear, not agreed with or in need of revision; (b) practice
whereby an employee did not follow policy/procedure; or (c) where the
complaints relate to staff behaviours.
3.13 Monitoring of complaint database closure e-forms shows that learning
outcomes are being completed for individual complaints however increased
scrutiny is being undertaken to look for commonalities that could identify
organisational learning opportunities. The Complaints Officer raised this issue
of learning from complaints at the Local Authority Complaint Handlers
Network (LACHN) meeting. This identified that, nationally, councils tend to
process individual complaints without any structured ways of capturing
common complaint themes to allow actions to be put in place to more widely
address issues.
3.14 Whilst this remains an agenda item for the LACHN to seek ways to improve
upon this, there has been little progress to date, mainly due to the recent
LACHN meetings being focused on the introduction of a Child Friendly
Complaint process. 
4. SUMMARY OF IMPLICATIONS
(a) Corporate Plan and 10 Year Plan - Local Outcomes Improvement
Plan (LOIP)
This report supports the Scottish Government’s national outcomes, in
particular the commitment to be accountable to the community as
stated: “Our public services are high quality, continually improving,
efficient and responsive to local people’s needs.”
Effective complaints reporting is used to ensure the efficient and
sustainable delivery of services to meet the Council’s priorities in
‘Moray 2026: A Plan for the Future.’ Within the Moray Council
Corporate Plan.
Page 17

Page 18

(b) Policy and Legal
The SPSO have made it a statutory requirement to have all local
authorities publish a Complaints Annual Report.
(c) Financial implications
It is not anticipated that there will be any financial implications.
(d) Risk Implications
Failure to adhere to the statutory SPSO requirement may result in
SPSO making a declaration of non-compliance against the Council.
Non-compliance with the statutory duty relating to national standards
being adopted would present risk in terms of reputational damage and
a loss of public confidence in reporting complaints.
(e) Staffing Implications
There are no staffing implications related to this report.
(f)  Property
There are no property implications related to this report.
(g) Equalities/Socio Economic Impact
The Equal Opportunities Officer has been consulted in the preparation
of this report. 
The Equal Opportunities Officer has recommended that where services
are experiencing high volumes of complaints, the management of
respective services should arrange to identify common complaint
issues and any learning arising. This will help to ensure that complaints
are not arising from situations where customer diversity needs have not
been considered or addressed, e.g. disability or cultural issues.
A further recommendation is that where there is evidence or a
suspicion that a complaint is related to characteristics protected under
the Equality Act 2010 (race, disability, sex, religion/belief, sexual
orientation, age, gender reassignment, pregnancy/maternity), services
must make contact the Council’s Equal Opportunities Officer.
(h) Consultations
The Corporate Management Team and Democratic Services Manager
have been consulted on the contents of the Complaints Annual Report
2023-24.
5. CONCLUSION
5.1 That the Committee approve publication of the Complaints Annual
Report 2023-24 to comply with the SPSO statutory requirement.
Author of Report: John Black, Complaints Officer
Background Papers: Held by Author
Ref:  SPMAN-2045703626-484
Page 18

Page 19

APPENDIX 1 
Complaints Handling Annual Report
2023-24 
Item 6.
Page 19

Page 20

APPENDIX 1 
Introduction 
At Moray Council, we aim to provide the highest level of service however there are times when we
don’t meet the expectations of our customers.  When this happens, it’s important we learn from the
complaints we receive and improve our service delivery. 
The Scottish Public Services Ombudsman (SPSO) is the responsible body for complaints handling for
the public sector in Scotland.  Their Model Complaints Handling Procedure (MCHP) defines how they
expect complaints to be dealt with.  In line with this, all complaints we receive are managed under
the two Stage Complaints Handling Procedure:   
To help improve the customer experience, we aim to resolve as many complaints as possible at
Stage 1.  However, if a customer remains dissatisfied following the 2 Stage process, we advise how
complaints can be passed to the SPSO for further consideration.   
Stage 1 - Also known as Frontline Resolution 
These complaints should be straightforward.  A
Stage 1 complaint could mean immediate action to
resolve the matter.  These complaints should be
answered within 5 working days. Most complaints
should be dealt with at Stage 1. 
Stage 2 – Also known as Investigation Stage 
A Stage 2 complaint may be a concern that has not
been successfully resolved at Stage 1 and is
therefore escalated or refers to a matter that is
more complex and requires a full and detailed
investigation.  These complaints should be
answered within 20 working days. 
Page 20

Page 21

APPENDIX 1 
Complaints Performance 
All complaints are recorded on our Complaints Management System.  Details are shared with our
Corporate Management Team and Heads of Service on a quarterly basis and with our Service
Committees every six months.  Our Complaints Officer holds regular meetings with Complaints
Administrators and at a national level, attends quarterly meetings of the Local Authority Complaint
Handlers Network. 
As part of a revised MCHP issued on 1 April 2021, local authorities are required to record and publish
complaints performance annually against 4 Key Performance Indicators (KPIs).  This report details
how we performed against these KPIs between 01 April 2023 and 31 March 2024 and provides
examples of changes introduced as a result of the complaints we have received.  For comparison
purposes, we have also included our performance from the previous two years and the 2023-24
national data for Scotland.   
Indicator 1: Total number of complaints received (including complaints per 1,000 population)
This indicator records the total number of complaints received at both Stage 1 and Stage 2.  To allow
for consistent benchmarking across all local authorities in Scotland, the figure per 1,000 population
is included. 
Table 1: Complaints received including per 1,000 population 
(2023-24 population based on Mid-Year Estimates 2022) 
During 2023-24, we received 747 complaints, an increase of 154 (26%) against 2022-23 and 206
(38%) from 2021-22.  Although complaints have risen to 7.92 per 1,000 population, we remain below
the national average of 9.93.  
Scotland
2021-22 2022-23 2023-24 2023-24
Total Complaints Received (Stage 1 and Stage 2) 541 593 747 47,294
Population 96,410 96,410 94,280 4,764,140
Complaints per 1,000 population 5.61 6.15 7.92 9.93
Moray Council
Page 21

Page 22

APPENDIX 1 
By department, complaints received by Environmental and Commercial Services increased from 191
to 296 while for Housing and Property Services, complaints fell from 191 to 180.   
Table 2: Number and % of Complaints received by Department   
NB percentages may not total 100% due to rounding 
Table 3 shows the most common complaints received by Environmental and Commercial Services in
2023-24, with a comparison provided for the previous two years.  Proportionally, Public/School
Transport has seen the largest increase from the previous year followed by Lighting, Winter
Maintenance and Household Collections.   
Table 3: Environmental and Commercial Services – Most Common Complaints 2023-24 (with previous years comparison)   
Recent changes within Environmental and Commercial Services can be linked to this notable
increase in complaints.  The enhanced m.connect service, including the launch of a new booking
system and app, led to a spike in complaints for Public Transport as new procedures were
introduced while a planned rise in the cost of the Garden Waste Permit resulted in a higher rate of
complaints for Household Collections.    
Environmental and Commercial Services 168 31% 191 32% 296 40%
Housing and Property Services 157 29% 191 32% 180 24%
Education 66 12% 64 11% 80 11%
Children and Families and Criminal Justice 23 4% 29 5% 44 6%
Financial Services 7 1% 36 6% 38 5%
Economic Growth and Development 37 7% 23 4% 37 5%
Health and Social Care Moray 24 4% 22 4% 26 3%
Education Resources and Communities 18 3% 14 2% 24 3%
Governance, Strategy and Performance 35 6% 21 4% 20 3%
HR, ICT and Organisational Development 6 1% 2 0.3% 2 0.3%
Grand Total 541 593 747
2021-22 2022-23 2023-24
Environmental and Commercial Services 2021-22 2022-23 2023-24
Household Collections 77 70 105
Road Maintenance 18 27 27
Public/School Transport 2 4 25
Complaint Against Staff 17 19 22
Winter Maintenance 1 11 22
Street Lighting 1 3 17
Page 22

Page 23

APPENDIX 1 
External factors also contributed, with a period of wintery weather leading to complaints around
Winter Maintenance while Moray Council received complaints relating to Street Lighting that were
found to be associated to work undertaken by third party organisations. 
For Housing and Property, the 2023-24 Service Plan included an action to improve the customer
service provided for housing repairs, to be measured by a 10% reduction in complaints.  A review of
complaints received by this Service show those relating to Repairs/Capital/Planned Maintenance, fell
by 14% from 130 in 2022-23 to 111 in 2023-24 achieving the planned outcome of this Service Plan
action and resulting in a fall in Housing and Property complaints overall. 
Indicator 2: Number and Percentage of complaints at each stage that were closed in full
within set timescales of 5 and 20 working days 
The MCHP requires complaints be closed within 5 working days at Stage 1 and 20 working days at
Stage 2.  While the aim is to handle complaints as quickly as possible, the main consideration must
always be to deliver a quality decision based on facts and evidence.       
Table 4: Complaints Closed 
Table 5: Number and Percentage of Complaints at each Stage that were closed in full within set timescales 
Scotland
2021-22 2022-23 2023-24 2023-24
Stage 1 402 466 586 39,272
Stage 2 118 80 123 4,001
Escalated Stage 2 14 26 26 2,476
Total 534 572 735 45,749
Moray Council
No. closed 
within
set timescales
% closed
within set
timescales
No. closed
within
set timescales
% closed
within set
timescales
No. closed
within
set timescales
% closed
within set
timescales
No. closed
within
set timescales
% closed
within set
timescales
Stage 1 310 77% 377 81% 494 84% 25,382 65%
Stage 2 89 75% 54 68% 61 50% 2,506 63%
Escalated Stage 2 4 29% 8 31% 4 15% 1,536 62%
Total 403 75% 439 77% 559 76% 29,424 64%
Moray Council Scotland
2021-22 2022-23 2023-24 2023-24
Page 23

Page 24

APPENDIX 1 
During 2023-24, we increased the proportion of Stage 1 complaints closed within target timescales.
Stage 2 complaints achieving target fell for the second consecutive year while Escalated Stage 2
complaints dropped to 15%.  Overall, our closed complaints meeting MCHP targets have remained
relatively static, however we continue to be above the national average.   
A higher proportion of our late complaints are recorded by Education and Children and Families and
Criminal Justice.  Due to the complex nature of the issues involved within these services, Stage 2
complaints can take longer to investigate fully.  In particular with Education, investigations can take
longer if the complaint is received immediately prior to a school holiday period.   
To reduce these late complaints, our Complaints Officer has worked with Administrators and Heads
of Service to develop a more proactive approach for dealing with complaints approaching their due
date, including the increased use of extensions.  The impact of this will be monitored over the next
few months.   
Indicator 3: Average time in working days for a full response to complaints at each stage
This indicator details the average time in working days for a full response to be provided to a
complaint at each stage.   
Table 6: Average Response Times (Working Days) 
Our average response time for Stage 1 complaints in 2023-24 improved to just above the MCHP
target of 5 working days, well below the national average of 9.4 days.  Stage 2 and Escalated Stage 2
complaints however both increased for the second consecutive year.  As highlighted with Indicator
2, we have fewer Stage 2 complaints meeting target timescales and this has an impact on our
average times.  The targeted work undertaken by our Complaints Officer to reduce late complaints
should help to address this.   
Scotland
2021-22 2022-23 2023-24 2023-24
Stage 1 5.1 6.26 5.36 9.40
Stage 2 20.9 27.45 27.92 22.80
Escalated Stage 2 26.2 28.73 32.77 19.60
Moray Council
Page 24

Page 25

APPENDIX 1 
Indicator 4: The outcome of complaints at each stage 
Once a complaint has been investigated, we are required to provide the customer with an
explanation of the findings and confirm the outcome category as one of the following; 
Upheld – when a complaint is found to be true or is confirmed.
Partially Upheld - where several issues have been raised and some, but not all, are upheld.
Resolved - where a complaint includes a number of issues, but we manage to agree an outcome
without the need to investigate and respond on each separately.  
Not Upheld - when a complaint is found to be untrue or where a reasonable standard of service has
been provided. 
Indicator 4 reports the number and percentage of our complaints closed at each stage against the
outcome decision.   
Table 7: The outcome of complaints at each Stage 
NB percentages may not total 100% due to rounding 
The outcome of our complaints by Stage varies against national averages.  With Stage 1, we have a
high proportion of complaints closed as Upheld and Not Upheld.  In contrast, Stage 1 complaints
closed as Resolved are significantly low.   
Stage 1
Not Upheld 182 45% 202 43% 276 47% 14,171 36%
Partially Upheld 49 12% 36 8% 51 9% 6,681 17%
Upheld 151 38% 212 45% 255 44% 12,232 31%
Resolved 20 5% 16 3% 4 1% 6,188 16%
Total Closed at Stage 1 402 466 586 39,272
Stage 2
Not Upheld 65 55% 39 49% 78 63% 2,106 53%
Partially Upheld 26 22% 22 28% 24 20% 1,012 25%
Upheld 24 20% 19 24% 19 15% 726 18%
Resolved 3 3% 0 0% 2 2% 157 4%
Total 118 80 123 4,001
Escalated Stage 2
Not Upheld 3 21% 10 38% 5 19% 1,080 44%
Partially Upheld 6 43% 13 50% 12 46% 570 23%
Upheld 5 36% 3 12% 8 31% 631 26%
Resolved 0 0% 0 0% 1 4% 195 8%
Total 14 26 26 2,476
Moray Council Scotland
2021-22 2022-23 2023-24 2023-24
Moray Council Scotland
2021-22 2022-23 2023-24 2023-24
Moray Council Scotland
2021-22 2022-23 2023-24 2023-24
Page 25

Page 26

APPENDIX 1 
The option to close a complaint as Resolved was introduced by the SPSO in 2021 and covers
complaints where a resolution has been agreed without the need to investigate each area.  To
ensure this category is applied correctly, our Complaints Officer regularly monitors Resolved
complaints.  If required, complaints are investigated fully, resulting in a more specific outcome of
Not Upheld, Upheld or Partially Upheld being applied.   
Following discussions with the Local Authority Complaint Handlers Network, it was clear this level of
monitoring is not routinely undertaken by other authorities and is perhaps why Resolved complaints
recorded by Moray Council are lower than the national average.     
For Stage 2 complaints, an increasing proportion have been closed as Not Upheld.  This is only
possible following a full investigation and may be a contributing factor in the increase of Stage 2
complaints exceeding target timescales.  The thoroughness of our investigation process can be
linked to the low number of complaints referred to the SPSO and the feedback they have provided
shows, in the majority of cases, the required standard of service has been provided. 
SPSO Complaints
If a complainant remains dissatisfied following the 2 Stage process, their complaint can be passed to
the SPSO for further consideration.  The SPSO provide feedback and, if required, recommendations
to help councils learn and improve.  When recommendations are made, the council must take action
within a specified time frame and provide evidence that demonstrates the learning and
improvements taken.   
During 2023-24, 10 complaints were considered by the SPSO however no recommendations for any
improvements were made.  Seven minor feedback points were raised and passed to the relevant
departments to make staff and managers aware.   
An annual report covering the seven feedback points will be discussed at the Audit and Scrutiny
Committee meeting on 20 November 2024.   
Page 26

Page 27

APPENDIX 1 
Learning from Complaints 
Complaints are a valuable source of information; they provide us with the opportunity to identify
trends or emerging issues and develop and improve our service delivery.  Some examples of changes
we have implemented due to complaints in 2023-24 are provided below.     
Public Transport
To improve the booking experience of the new
m.connect service, additional training and
procedures have been implemented for both
contact centre staff and drivers.  Roaming sim
cards have been purchased to ensure more
reliable system coverage and the liftandgo app has
been updated to improve notifications for
passengers.
Housing Repairs
To reduce complaints relating to remedial
work, new Tenant Liaison Assistants have
been recruited to improve scheduling of
repairs and communication with tenants and
contractors.  Housing have also worked with
ICT to develop a new booking system for
inspections and implemented a new mould
and damp policy to reduce time taken to
address these issues. 
Education  
Following concerns highlighted to Education,
school procedures around use of personal devices
and social media permissions have been
improved.  Protocols relating to food allergies and
issuing of medication have also been updated. 
Education Resources and Communities
To improve accessibility at one of our community
facilities, we instigated work to construct dropped
kerbs allowing safer entry for all.  
Household Collections
Although issues around supplier lead times for
new/replacement bins is out with the control of
the Waste Team, improvements have been made
to internal stock control procedures to minimise
disruption should delivery take longer than
expected.  
Children & Families
To improve communication and
understanding of procedures, a practitioner
toolkit and a family leaflet are in
development.  Staff have also been reminded
of the importance of regular, timely updates.
Antisocial Behaviour
To minimise the impact on local communities, a
new system has been introduced that will
improve the monitoring of ASB at council
properties used for homeless accommodation.  
Financial Services
Work practices and procedures have
been improved within Financial
Services, ensuring all enquiries
receive a prompt and thorough
response. 
Page 27

Page 28

APPENDIX 1 
Customer Satisfaction 
In December 2021, as part of our plans for recovery and renewal from the Covid pandemic, we
replaced paper copies of our survey with a link to an online questionnaire, sent to those supplying an
email address.  In 2023-24, 567 links to our survey were issued resulting in 68 responses and a return
rate of 12%.  This is an improvement on the 8% recorded in 2022-23 and similar to that achieved in
2021-22 when paper surveys were issued for most of the year.  Alternative methods, within available
resources, that could increase responses are kept under review however low response rates to
complaint surveys are evident nationally.   
Our survey requests feedback on the process of dealing with a complaint as opposed to the
complaint outcome.  In 2023-24, it was highlighted information about our complaint’s procedure
was accessible and our responses were clear and easy to understand.  Areas identified for
improvement included ensuring all points raised are addressed and that we communicate better
regarding timescales and the next stages of a complaint.  Refresher training has been undertaken
with Administrators covering the need to accurately agree all areas of a complaint and improve
communication with the complainant. 
Conclusion 
We are committed to learning from the views and experiences of our customers.  To do this, we aim
to record complaints accurately and adhere to the Complaints Handling Procedure.  Where a
complaint is closed as upheld or partially upheld, learning and improvement opportunities are
identified to improve service provision.  This can lead to a change in process or policy to prevent or
reduce the likelihood of similar complaints occurring.   
This Annual Report complies with the SPSO’s requirement to publish our complaints performance
against their 4 key performance indicators.  It also highlights some of the recent changes we’ve
made as a result of the complaints we’ve received.  We will continue to welcome customer feedback
and work towards providing the best service possible.   
Contact Us
For more information on our complaints procedure, or to make a complaint via our complaints e-
form, visit www.moray.gov.uk/complaints.  For more detailed advice or to request a copy of the
procedure in another format contact 01343 543451 or email complaints@moray.gov.uk.
Page 28

Page 29

REPORT TO: CORPORATE COMMITTEE ON 5 NOVEMBER 2024
SUBJECT: ANNUAL PROCUREMENT REPORT FOR 2023/24,
PROCUREMENT STRATEGY FOR 2024/25 AND PROCUREMENT
STRATEGIC ACTION PLAN FOR 2024 TO 2026
BY: DEPUTE CHIEF EXECUTIVE (ECONONY, ENVIRONMENT AND
FINANCE)
1. REASON FOR REPORT
1.1 To provide the Committee with the annual procurement report (annual report)
for 2023/24 in line with our duties under the Procurement Reform (Scotland)
Act 2014 (“the Act”). Once approved by the Committee a copy of this report
will be provided to the Scottish Government and published on the Moray
Council website.
1.2 To inform the Committee that the procurement strategy for the current
financial year 2024/25 is being reviewed and prepared for Committee’s
approval in line with the duties outlined in s 15 of the Act.
1.3 To inform the Committee of the procurement strategic action plan (PSAP) for
2024-2026 including the approach to improving procurement compliance and
alignment with the Act through a review of the procurement strategy,
procurement policy and procurement procedures.
1.4 This report is submitted to Committee in terms of Section III (B) (21) of the
Council's Scheme of Administration relating to procurement arrangements.
2. RECOMMENDATION
2.1 It is recommended that the Committee:
(i) considers and notes the procurement activities for the year
2023/24 as contained within the annual procurement report;
(ii) considers and notes the procurement team are preparing the
procurement strategy for 2024/25 which will be provided to
Committee for review within the current financial year; and
(iii) approves the planned improvement activities over the next two
years (2024-26) as detailed in the annual report (Appendix C) with
summary provided in section 5 below.
Item 7.
Page 29

Page 30

3. BACKGROUND
3.1     The Act requires public bodies with an annual expenditure of over £5million to
publish an annual report and prepare an annual procurement strategy. To
meet our duties under part 2 of the Act, the procurement team has prepared
the annual procurement report for 2023/24 and is preparing the annual
procurement strategy for the current financial year.
3.2    The procurement team continues to work closely with accountancy to
streamline processes and maintain oversight of project planning and
expenditure with the aim of working closely with lead officers early on in their
projects. The aim for this is to ensure procurement processes are completed
with enough time to achieve best value and a focus on savings in
consideration of the current budgetary pressures.
4. ANNUAL PROCUREMENT REPORT
4.1 The annual report for 2023/24 has been aligned to the report guidance
provided by the Scottish Government. As detailed in the PSAP, the
procurement team has included activities to further align the 2024/25 annual
report with the requirements, including a review of the data collection
methodology.
4.2 During the reporting period, there were several key achievements against the
procurement strategy’s six procurement objectives. These procurement
measures along with the PSAP aim to support and evidence the delivery of
the procurement strategy which sets out how procurement activity will be
undertaken in line with Council plans/policy and duties under the Act. Further
detail is provided within the report and highlights provided as follows:
4.3 In November 2023, the Council expanded the use of purchase cards
(embedded) for the purchase of education supplies. As a result, the Council
now achieves a rebate for purchase card transactions which is 0.796% of card
spend. 
4.4 99.25% of all Council expenditure was covered by contracted suppliers in the
reporting period which exceeded our target figure of 95% and showed an
increase on the 90.73% from 2022/23.
4.5 The annual Departmental Procurement Action Plan was completed in January
2024 and forward plans were developed in partnership with the departments.
53.65% of procurement activities during the year were unplanned, which
whilst an improvement on the previous year, still remains at a much higher
rate than our target of 25% unplanned activity and reflects the overall increase
in workload. 
4.6 The Council saw an improvement in the percentage of accounts payable
transactions that had a purchase order number during the year. The total for
2023/24 was 75.87% which meets our target of 75%. This figure has
remained steady at around 75% for some years.
Page 30

Page 31

4.7 The Council continued to work with and report to the Climate Change Board to
meet climate change action plan expectations and the procurement specific
actions within the climate change action plan.
4.8 32.2% of contracts commenced during the year to SMEs, which exceeded our
target of 30%. This resulted in a 50.50% value of annual spend with SMEs
during the year.
4.9     Overall cash savings recorded for 2023/24 are contained in the report and 
detailed in the table below. The Council has maintained a savings target of 
£1M for a number of years in the expectation that it would become harder to
achieve savings from recurring contractual award. As we re-let contracts it
becomes harder to deliver on cash savings particularly in the current
inflationary market.
4.10 Maintaining the value for budget adjusted makes the most difference to the
Council’s budget. However, any category of saving achieved from the
procurement process means that the contract starts from a much better
position and even if increases are imposed, they start at a lower level. Given
the challenges outlined above it is encouraging that savings continue to be
made at a significant level.
2023/24 2022/23Category
Recurring
savings
Savings for
year
Recurring
savings
Savings for
year
Budget not
adjusted
£791,405 £654,056 £688,000 £627,000
Budget adjusted £937,906 £870,448 £951,000 £935,000
Total £1,729,311 £1,524,504 £1,638,000 £1,562,000
Capital N/A £879,096 N/A £3,470,000
Rebate N/A £76,106 N/A £67,000
5. PROCUREMENT STRATEGY AND STRATEGIC ACTION PLAN
Procurement Strategy
5.1 To meet the duties under s 15 of the Act the Council must prepare an annual
procurement strategy. The procurement team is finalising the procurement
strategy for 2024/25 and will provide to the Committee for approval within the
current financial year.  This will take into account implications arising from the
Council’s Sustainability Statement, which is the subject of a separate rep0rt to
this committee.
Procurement Strategic Action Plan (PSAP)
5.2 A review of the PSAP for 2023/24 and the PSAP for the next two financial
years, 2024/25 to 2025/26 has been completed and is contained in
APPENDIX B and C of the annual report.
5.3 The PSAP includes a full review of the procurement policy, which was last
updated in 2007, along with the associated procurement procedures. The
intention behind the review will be to provide clear guidance to staff on
Page 31

Page 32

completing procurement activities, including investigating the potential for
introducing thresholds/processes for the use of speculative frameworks.
Additionally, the procurement team will review the savings strategy to align
with Scottish Government and Moray Council reporting requirements. This will
include a review of the data collection process and contract register.
5.4 In August 2024 the procurement team commenced a review of the approach
to the Departmental Procurement Action Planning Process and has been
consulting across the Council with the view to improve the process and
maintain long term visibility of procurements in partnership with Accountancy.
The aims for this are to promote regular engagement/oversight activities and
therefore improve the chances of increased competitive approaches in the
interests of financial savings for the Council.
6. SUMMARY OF IMPLICATIONS
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The PSAP for 2024 to 2026 is focussed on procurement compliance
activities. This includes updates to the procurement strategy, policy and
procedure alongside improvements to the prioritisation and planning of
procurement projects through a review and change to the departmental
procurement action plan process. This ensures a link to the priorities
identified in the Corporate Plan and aims to improve financial controls in
light of budgetary pressures.
(b) Policy and Legal
The Moray Council procurement policy has not been reviewed since
2007 and will be reviewed as a PSAP activity in 2024-2026. The aim for
this review is to align with the broader statutory requirements, support
the annual procurement report process and provide clear controls for
procurement activities, in line with Moray Council and Scottish
Government regulations. During the policy review process the
procurement team will consider what compliance measures may be
introduced.
(c) Financial implications
Details of the savings are shown in section 7 of the annual report. The
procurement savings make a significant contribution to the Council’s
ability to balance its budget.
Additionally, the PSAP activities for the next two years will investigate
including/defining financial thresholds for procurement projects through
an updated procurement policy and continued alignment with the
Council’s financial regulations. Introducing compliance activities has the
potential to reduce uncontracted expenditure and capture greater
savings for the Council.
(d) Risk Implications
The Council must prepare an annual procurement report under s 18 of
the Act and a procurement strategy under s 15 of the Act. Without a
Page 32

Page 33

clear procurement strategy in place, this has the potential to impact the
Council’s ability to achieve savings and procurement benefits in future
years.
(e) Staffing Implications
There are no staffing implications arising directly from this report, but
there is a significant amount of work to improve the procurement process
over the next two years. Work on options for a new departmental action
plan process has been underway since August 2024 with the
procurement team consulting with departments. Whilst the procurement
team is facing an increased workload, we aim for this to shift back to
normal levels once we start to see the impact of improved processes.
(f) Property
There are no property issues arising directly from this report.
(g) Equalities/Socio Economic Impact
There are no equalities issues arising directly from this report.
.
(h) Climate Change and Biodiversity Impacts
While there are no climate change and biodiversity issues arising directly
from this report, the PSAP includes an activity to align with Scottish
Government requirements for net zero/climate change in relation to
procurement and will continue to work with the Council’s Climate Change
team.
(i) Consultations
Information contained in the departmental procurement action plans was
agreed with Heads of Service in January 2024 and this has been used to
create the future regulated procurement summary in the annual report.
The accountancy section and Chief Financial Officer have been
consulted in the preparation of this report.
7. CONCLUSION
7.1 The Council’s annual report has been completed for the 2023/24
financial year in compliance with the Council’s duties under the Act.
7.2 The procurement strategic action plan has been prepared and contained
within the procurement report (Appendix C). It identifies numerous areas
for further improvement across the next two years from 2024-2026 and
includes a review of the procurement strategy, policy and procedures. 
Author of Report:   Emily MacLeod, Assistant Procurement Manager
Background Papers:
Ref:   SPMAN-1293228629-1169
Page 33

Page 34

Page 34

Page 35

1
Contents
1 Introduction.........................................................................................................................3
2 Summary of regulated procurements .................................................................................4
3 Review of procurement compliance....................................................................................5
4 Community benefits and the real living wage.....................................................................8
5 Payment performance ........................................................................................................8
6 Supported businesses summary ........................................................................................9
7 Spend and savings summary .............................................................................................9
MORAY COUNCIL
ANNUAL PROCUREMENT REPORT
2023/2024
Item 7.
Page 35

Page 36

2
8 Future regulated procurements ........................................................................................10
9 Appendices.......................................................................................................................12
Appendix A – Procurement targets......................................................................................12
Appendix B – Procurement strategic action plan – review of 2023/24 ................................13
Appendix C – Procurement strategic action plan for 2024-2026.........................................14
Appendix D – Planned procurement activity for 2024-2026.................................................15
1 Introduction
As a public sector authority with an annual spend greater than £5 million, Moray Council
(Council) is required to produce an annual procurement report under s 18 of the Procurement
Reform (Scotland) Act 2014 (Act). The Council’s annual procurement report (procurement
report) covers the period from 1 April 2023 to 31 March 2024.
This report details how the Council has complied with its obligations under the Act, and
provides a summary of the Council’s procurement activities within the reporting period,
detailing how these have aligned with the Council’s procurement strategy for 2023-2026
(procurement strategy). The Council’s procurement activities are conducted according to the
Act, which establishes the statutory and legislative framework for sustainable public
procurement that supports Scotland’s economic growth.
Page 36

Page 37

3
The Council uses its spending power through goods, works and services to make Moray a
great place to work and do business. Our published procurement strategy details the six
council objectives for procurement being:
 Savings
 Contracts
 Compliance
 Accessibility
 Community benefits
 Sustainability
The procurement strategy aligns with the corporate plan that sets the vision and priorities of
the Council. This vision is of a Moray where people, prosper, free from poverty and
inequality; our young people grow up safe, well-educated and reach their full potential;
people lead healthy lives and have access to quality care when they need it; our businesses
and communities prosper; and our natural environment thrives for the betterment of all
The Council continues to face significant challenges and is impacted by external events
including conflict in Ukraine and Russia, the cost-of-living crisis, an increased demand for
services and reduced budgets. The procurement team continues to work closely with
departments to plan and streamline processes and secure savings. The procurement team is
dedicated to improving good outcomes for Moray and acknowledges the broader role of
procurement in supporting service delivery and realising Council priorities.
2 Summary of regulated procurements
The table below provides a summary of the number and value of live contracts in 2023/24 by contract
category. This is comprised of awards under local and national frameworks which includes new
requirements, extensions and re-tenders/collaborations with other public bodies.
Table 1 – Live contracts in 2023/24
2023/24
Contract Type Quantity Estimated annual value
Category A (national) 31 £6,296,778
Category B (sectoral) 167 £48,685,014
Category C (local Single Supplier) 161 £37,611,727
Category C (framework) 7 £4,763,337
Category C1 (local collaboration) 13 £1,100,044
Category O (other) 141 £8,893,071
Non advertised 112 £32,723,962
Quick quotes (under £50,000) 79 £2,238,821
Page 37

Page 38

4
2023/2024 Total 711 £142,312,754
In total there were 711 contracts listed on the Council’s contract register in the reporting period. There
were 587 unique suppliers and of these unique suppliers a total of 423 were SMEs. There were 264
regulated procurements in the reporting period at an estimated total value of £54,311,000. In addition
to this, there were 48 quick quotes published on the Public Contracts Scotland (PCS) portal in order
to source competitive quotes for low value/low risk procurement exercises (below £50,000).
There has been a year-on-year increase in contractual volume post-pandemic with figures increasing
since the 2021/22 financial year. Alternative methods of procurement in line with the regulations and
the Council’s corporate policy and procedure were used on occasion to meet specialist or urgent
need.
To provide transparency of contracts held by the Council, we publish a contract register on our
website which contains information on live contracts and is regularly updated to include new awards.
3 Review of procurement compliance
Section 17 of the Act requires the Council to carry out regulated procurement activity in accordance
with the Council’s procurement strategy. The procurement strategy 2023-2026 contains our
procurement responsibilities in line with the Act and details our commitments including to ethical
procurement, community benefits, health and safety, living wage and a positive workforce culture. The
vision statement is to:
“Embed commercial excellence throughout the organisation, ensuring that our services always deliver
best value for Moray through the consistent application of this strategy, embedding community benefit
and climate focus in our procurement processes to deliver the corporate priorities of our people, our
place and our future, supporting an economy based on wellbeing and inclusion”
In addition to the procurement strategy and procurement policy, the Council’s procurement
procedures outline the procedures to be followed by all staff when procuring/purchasing goods,
services and works. Procurement support is provided for all regulated procurements over £50,000,
and quick quotes (under £50,000) are reviewed before publication. This level of advice and oversight
ensures compliance with regulations, legislation and Council policy, with procurement limits
determining the procurement pathway:
 Up to £10,000 = best price
Page 38

Page 39

5
 £10,000 to £50,000 = quick quote
 £50,001+ = regulated tender for goods and services
 £2,000,000+ = regulated tender for works
All procurements have an individual procurement strategy developed through collaboration between
the procurement team and the lead officer. This joint approach ensures full consideration of the
requirements, options, potential for added value and the inclusion of wider opportunities. This also
provides an avenue to focus on and generate supplier development opportunities, fair work first,
climate change, non-cash benefits and innovation considerations. Checks are also carried out for
serious organised crime links and mandatory exclusions.
Procurement targets and procurement strategic action plan
Key achievements and progress against the procurement strategy’s six procurement objectives is
summarised below, with further detail provided at Appendix A and B.
These procurement measures along with the procurement strategic action plan (PSAP) aim to support
and evidence the delivery of the procurement strategy which sets out how procurement activity will be
undertaken in line with Council plans/policy and duties under the Act. A review of the 2023/24 PSAP
activities are provided at Appendix B and the PSAP for the next two years (2024-2026) is provided at
Appendix C.
Table 2 – Summary of procurement strategy objectives and achievements
Savings  Total savings achieved for 2023/24 = recurring (£1,729,311) and actual in
year (£1,524,504) – summary in Section 7
 Non-cash benefits that have been recorded in contracts awarded in the
year - refer below and Section 7
 In November 2023 the Council expanded the use of purchase cards
(embedded) for the purchase of education supplies. As a result, the
Council now achieves a rebate for purchase card transactions which is
0.796% of card spend
Contracts  The annual departmental procurement action plan was completed in
January 2024 and forward plans were developed in partnership with
departments
 There were 180 unplanned procurement activities during the year which
reflects the overall increase in workload.
Compliance  75.87% of accounts payable transactions with a purchase order number
during the year which meets our target of 75%
 The procurement team continued to work with and report to the Climate
Change Board to meet climate change action plan expectations and the
procurement specific actions within the climate change action plan
Accessibility  50.50% value of annual spend with SMEs during the year. 32.2% of
contracts commenced during the year to SMEs, which exceeded our target
of 30%.
Page 39

Page 40

6
Community
benefits
 256 contracts commenced during the year which have a non-cash benefit
by category
 Using the wider context of local, we measure the spend between Aberdeen
City and Shire, Moray and the Highland borders. This is a measure that
fluctuates between years but remains constantly in the 50% range
Sustainability  5.68% of contracts commenced during the year which have a sustainable
target. With further focus on this we should see an increase in the future
with more benefits being delivered
Non-cash benefits
The Council considered a wide range of non-cash benefits when developing tender specifications that
is wider than the social, environmental or economic factors (also referred to as community benefits)
required under the Act. A summary is provided in Table 3 below which includes added value benefits
such as process efficiencies and price stability. The Act only requires community benefits inclusion in
tenders with a value of over £4 million, however the Council considers inclusion wherever possible in
all procurement activities.
Table 3 – Non-cash benefits
Benefit Category # of contracts Sub-category
Collaboration/tender process 217 210 in procurement development time
7 digital processes
Cost avoidance 8 2 added value
2 price increase rejection
4 price vs. market savings
Purchase to pay process 7 6 e-invoicing
1 consolidated billing
Demand/rationalisation 11 7 specific contract issues
1 rationalised lists
3 rebates
Community 54 11 apprentices
7 school visits
20 training
16 CBC clause
Environmental 22 11 greenhouse gases
6 waste
3 energy
2 sustainable construction
Social 13 2 sub-contracting programme
6 fair work issues
4 other – wide ranging
1 participatory budget
Living wage and fair work first 128 36 accredited
Page 40

Page 41

7
5 working to accreditation
67 paying living wage
5 not paying living wage but will commit to
pay within contract
13 neither paying or accredited
4 Community benefits and the real living wage
The Council is committed to maximising community benefits from procurement activities along with
delivering wider benefits for the community when purchasing goods, services and supplies for Moray.
As detailed in Section 3, the Council considers a wide range of non-cash benefits when developing a
tender specification that is broader than the community benefits that is required by the Act. The Act
requires community benefits inclusion in tenders with a value of over £4 million, however Moray
considers inclusion wherever possible in all supported tenders over £50,000.
The Council has a community wealth building strategy which, as a progressive economic approach,
aims to retain and circulate wealth within local communities. The procurement team remains a partner
to the objectives of growing the percentage of procurement spend with Moray based suppliers from
each anchor, increasing anchor spend with community led or third sector businesses, and supporting
delivery of fair work first through anchor spend.
Total number of regulated contracts awarded with a value of £4 million or
greater
3
Total number of regulated contracts awarded with a value of £4 million or
greater that contain Community Benefit Requirements
1
Total number of regulated contracts awarded with a value of less than £4
million that contain Community Benefit Requirements
28
The Council secured living wage accreditation in September 2022 and continues to encourage the
real living wage within the supply chain, through its procurement activities. In the reporting period
there were 113 contracts awarded that were either accredited living wage, working towards
accreditation, already paying the living wage, or committed to paying the living wage.
Page 41

Page 42

8
5 Payment performance
6 Supported businesses
summary 
Public organisations can reserve the right to participate in procurement for the award of a public
contract/framework to a supported business. A supported business is an organisation with a main aim
of integrating disabled or disadvantaged persons and where at least 30% of those employed and
engaged with the programme have a disability or are disadvantaged.
The Council spent an estimated total of £1,113,000 with the following supported businesses in the
reporting period:
 Moray Reach Out (Training Places & Waste Watchers) = £392,404
 Out of the Darkness = £148,871
 Living Ambitions (Previously Lock Park Rural Skills = £558,512
 Scotland’s Bravest Manufacturing Company = £443
 Hey Girls = £11,877
 Scott Direct = £712
Not all of these suppliers formally meet the supported business employment criteria under the Act, but
they meet the engagement element, and the Council is confident that the use of these suppliers goes
some way to meeting the Act requirements.
7 Spend and savings summary
67,003 valid invoices received during the reporting period
92.21% of valid invoices received during the reporting period that were
paid on time
309 regulated contracts awarded during the reporting period that contained a
contract term requiring prompt payment of invoices in public contract supply
chains
Page 42

Page 43

9
The current economic climate continues to produce uncertainty in the supply chain and increased
demand on certain markets. We continue to progress some tenders without any response to our
publications, but we continue to work closely with the departments to provide the support they need.
Total procurement spend during the reporting period £126,105,066
Total procurement spend with SMEs during the reporting period £70,306,875
Total delivered cash savings delivered for the period of the report £870,448
The Council records the cash (Table 3) and non-cash benefits (Section 3) of contracts along with
recording cash savings under the following categories:
1. Cash saving anticipated – but budget not adjusted
2. Cash saving anticipated – budget adjusted
3. No baseline – savings cannot be established, review of contract on anniversary of award to
reassess
4. No savings anticipated
5. Non-cash benefits
6. Capital – projects delivering savings against estimate/budget, total saving taken in the year the
project was awarded
7. Rebate – centralised collection of contract rebates
Table 3 – Cash savings
Category Recurring
savings
Annual savings Recurring
savings
Annual savings
2023/24 2022/23
Budget not
adjusted
£791,405 £654,056 £688,000 £627,000
Budget adjusted £937,906 £870,448 £951,000 £935,000
Total £1,729,311 £1,524,504 £1,638,000 £1,562,000
Capital N/A £879,097 N/A £3,470,000
Rebate N/A £76,107 N/A £67,000
Overall cash savings recorded for 2023/24 are contained in the report and detailed in the table below.
The Council has maintained a savings target of £1M for a number of years in the expectation that it
would become harder to achieve savings from recurring contractual award. As we re-let contracts it
becomes harder to deliver on cash savings particularly in the current inflationary market.
These savings are calculated using the estimated values at point of contract award. The values are
only amended for any annual increases applied to long term service contracts, if the team are made
aware of such changes.
Maintaining the value for budget adjusted makes the most difference to the Council’s budget.
However, any category of saving achieved from the procurement process means that the contract
starts from a much better position and even if increases are imposed, they start at a lower level.
Page 43

Page 44

10
Given the challenges outlined above it is encouraging that savings continue to be made at a
significant level.
8 Future regulated procurements
The procurement team worked with Heads of Service during the reporting period to develop a
departmental procurement action plan (DPAP) for their service that identified the Council’s
procurement activity for the year ahead. The DPAP was completed in January 2024 for the 2024/25
financial year.
The DPAP includes information from the expiring contract register, capital plan and other projects to
inform the forward plan at Appendix D and which can also be found on our website. The publicly
available Forward Plan and the Capital Plan informs the market of our intentions but cannot
guarantee that all projects listed will result in a competitive tender. It also directs attention to those
projects that may benefit from climate change and a community wealth building focus.
Between April 2024 to 2026 the Council is estimated to have:
 Number of contracts expiring in the period = 258
 With total estimated value of these expiring contracts being = £246,253,834
The above statistics are taken from the contract register. This list contains all contracts with an end
date between April 2024 to March 2026, however it should be noted that some may be subject to
possible extensions, and some may not be re-let. Decisions about the direction for each requirement
are taken during the annual planning process with Heads of Service.
Page 44

Page 45

11
9 Appendices
Appendix A – Procurement targets
Savings measure Target Achieved 23/24 Achieved 22/23
1 Percentage of all council expenditure
covered by contracted suppliers
Total commercial spend = contract register
annual estimated values for live contract in
a year
95% 99.25% 90.73%
2 Value of procurement savings achieved
through contracts live during the year
£1 million £1.729 million £1.638 million
3 Number of collaborative contracts awarded
as a percentage of all commenced in year
40% 55.30% 55.03%
4 Percentage of contracts (including call off
from framework) commenced in year that
contain a contract benefit (all categories)
85% 96.97% 96.83%
5 Percentage of unplanned contract activity
during the year
25% 53.65% 61.42%
6 Percentage of account payable
transactions with a purchase order (where
relevant i.e. non-recurring) number during
year
75% 75.87% 74.79%
7 Percentage of contracts (excluding call
offs) commenced during year to SMEs 30% 32.20% 21.69%
8 Percentage value of annual spend with
SMEs for year 55% 50.50% 53.61%
9 Percentage value of spend with Moray,
Highland and Aberdeen council areas 50% 43.90% 42.98%
10 Number of “events” held or participated in
during year 10 9 18
Page 45

Page 46

12
11 Percentage of commenced contracts within
the year that have a community benefit 20% 10.98% 11.11%
12 Percentage of collaborative contracts
commenced in the year that have a
community benefit
20% 8.33% 10.05%
13 Percentage of contracts commenced in the
year that have incorporated a sustainable
target
20% 5.68% 9.52%
14 Score on flexible framework Level 3 Level 3 Level 3
Appendix B – Procurement strategic action plan – review of 2023/24
Action Timetable Progress
1 To develop existing
contract register to
improve data access and
meet statutory/council
requirements
March 2024 First round of upgrades complete but not yet
launched. Further developments are planned
for 2024/25
2 Work with Scotland Excel
to compare contract
spend with actual
supplier spend
Sept 2023 Complete for 2023/24. Meeting attended by
procurement team and Scotland Excel
3 Expand the current
purchasing card
(embedded) process to
education materials
supplier
Sept 2023 Complete and went live in November 2023. In
November 2023 the Council expanded the use
of purchase cards (embedded) for the
purchase of education supplies. As a result,
the Council now achieves a rebate for
purchase card transactions which is 0.796% of
card spend
4 Health & Social Care
(MIJB) Support
Ongoing Ongoing. Support and engagement continue
along with contract maintenance activities in
partnership with H&SC
5 Review and update the
procurement procedures
to reflect the inclusion of
commissioning teams
within H&SC and
children’s services
March 2024 Ongoing, but engagement continued
throughout 2023/24 with further actions
planned for 2024/25 to identify the workflow
with commissioning, and implement any
required procedural changes
6 Supplier development
program (SDP)
Throughout the
year
Continued to support the SDP and embed
community identified benefits system into
relevant projects to meet CWB expectations
7 Review the procurement
savings strategy (written
in 2016)
March 2024 Deferred to 2024/25. To establish if still
relevant and consider level of savings sought
from each tender (currently 3%)
Page 46

Page 47

13
8 To support and deliver
requirements identified in
the Climate Change
Action Plan
Ongoing Ongoing. To meet climate change action plan
expectations and the procurement specific
actions within the climate change action plan
9 Review the requirement
for Equalities Impact
Assessments for each
contract
Dec 2023 Deferred to 2025/26
10 Review the GDPR
requirements and review
impacted areas
Dec 2023 Deferred to 2024/25
Appendix C – Procurement strategic action plan for 2024-2026
2024/25
1 Prepare and publish the Council’s annual procurement strategy including continued alignment
with ethical procurement, modern slavery, CWB, fair work and other requirements of the Best
Vakue sustainability requirement
2 Review the internal project procurement strategy (PR08) to facilitate planning, options and
alignment with strategic objectives, the responsibilities under the statutory framework
3 Review and develop a new departmental procurement action plan process, exploring options to
further plan procurement activity and focus on savings through streamlining process.
4 Review the procurement savings strategy, contract register and data capture to align with
statutory reporting requirements
5 Review the contract register and data capture to align with statutory reporting requirements
6 Investigate options for a new e-signing process
7 To support and deliver requirements identified in the climate change action plan and align with
the Scottish Government statutory framework on climate change
8 Research/investigate scope for including cyber security requirements in procurement processes
9 Health & Social Care (MIJB) support
10 Review and update the procurement procedures to reflect the inclusion of commissioning teams
within H&SC and children’s services
2025/26
1 Review the council procurement policy and associated procedures
2 Review the requirement for equalities impact assessments for each contract
3 Review the GDPR requirements and meet with the records officer and review the areas which are
impacted by GDPR (care, etc)
4 Continue to action items assigned items under the Community Wealth Building Strategy
5 Increased engagement across the Council and with procurement partners
Page 47

Page 48

14
Appendix D – Planned procurement activity for 2024-2026
Contract Title Project start
Wash Dry Toilets tbc
Day Opportunities tbc
OT Aids tbc
Early Years Science, Technology, Engineering and Mathematics Centre
at Elgin Library
tbc
Delivery of Digital Community Engagement Platform for Moray Council tbc
Treatment of Paper, Cardboard, News and PAMs (Separate and/or
Mixed)
tbc
Treatment of Glass (Separate and/or Mixed) tbc
Treatment of Mixed Plastic Containers tbc
Vegetation clearance – Gibb’s Lane, Buckie tbc
Structural Engineering Inspections tbc
Forres  3G Astroturf facility development tbc
Westview - Care at Home & Housing Support tbc
Asbestos Software tbc
Cashless Parking tbc
Checkpoint Security Products and Associated Services tbc
Annual Inspection of Moray Managed and Maintained Play Areas tbc
Window Replacement 123 Addresses Moray Wide tbc
A941 Longmorn – Hardstanding for Road Safety Camera Van Q3, 2023-24
Elgin Town Hall Integrated Design Team, Architect Lead Team Q3, 2023-24
Moray's Routes Q2, 2023-24
Phase One: Elgin Town Hall - Main Works Contractor Q3, 2023-24
Phase Two: Grant Lodge- Enabling Works / Fabric Repairs Q3, 2023-24
Overarching Agreement for child placements at Keilhill Q3, 2023-24
Functional Family Therapy Service Q3, 2023-24
Restorative Family Support Project Q3, 2023-24
Insurance Services Q3, 2023-24
Sheriff Officer Services Q3, 2023-24
Advertising Services Q3, 2023-24
VMware Support Q3, 2023-24
Annual IT Security Testing Q3, 2023-24
Page 48

Page 49

15
Solarwinds IPAM and CatTools Support Q3, 2023-24
PSN Core Services Q3, 2023-24
Servicing and Provision of Parts for Changing Room Lockers Q3, 2023-24
CO2 Gas for Swimming Pools Q3, 2023-24
Maintenance of School Synthetic Turf Pitches Q3, 2023-24
Pest Control Services and Associated Products Q3, 2023-24
Employability Services Q3, 2023-24
Bus Revolution - Booking App and Scheduling/ Tracking Software Q3, 2023-24
Harbour Structural Inspections Q3, 2023-24
Multi-Carrier SIM Cards Q3, 2023-24
Cooper Park Pond Q3, 2023-24
Cooper Park café Q3, 2023-24
Blackhills Culvert Q3, 2023-24
CT2675 Professional Services Framework Q3, 2023-24
Energy Performance Certificates Non Domestic Properties Q3, 2023-24
Maintenance & Repair of Fire & Security Systems & Equipment Q3, 2023-24
ASHP Upgrade and PV-Solar Panels Q3, 2023-24
Smoothwall Q3, 2023-24
Glazing Maintenance Q3, 2023-24
Road Marking Works Q4, 2023-24
HiTrans Q4, 2023-24
Scottish Road Works Commissioner Q4, 2023-24
Waste Facilities (SEPA) Q4, 2023-24
Core Local Area Network (LAN) Equipment Refresh - Phase 1 Q4, 2023-24
Occupational Health, Employee Assistance Programmes and Eye Care Q4, 2023-24
Records Information Mgt, Digital Solutions and Assoc Services Q4, 2023-24
Multiply Fund LEAD Q4, 2023-24
Moray Multiply Project Numeracy Q4, 2023-24
Forres Conservation & Heritage Scheme Q4, 2023-24
Elgin Saw SWMP Q4, 2023-24
Sanquhar Footbridge Q4, 2023-24
Phase Zero: External Works/Public Realm - D&B / Landscape Designs
and Small Works Contract
Q4, 2023-24
A941/340 New Bishopmill Bridge Q2, 2023-24
Salt Barn Keith Q4, 2023-24
AI Digital Assistant to integrate with the Council Website to provide 24/7 tbc
Deposit Return Scheme - Reverse Vending Machine tbc
Agency Framework tbc
Multi-Disciplinary Design Team to undertake design work for Milbuies
Land Development
Q1, 2025/26
Batchen Lane MSCP Resurfacing, replacement expansion joints and
surface water drainage – Phase 2
tbc
Page 49

Page 50

Page 50

Page 51

REPORT TO: CORPORATE COMMITTEE 5 NOVEMBER 2024
SUBJECT: BEST VALUE ACTION PLAN PROGRESS REPORTING
BY: DEPUTE CHIEF EXECTUIVE (EDUCATION COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT
1. REASON FOR REPORT
1.1 To inform the Committee of progress against the actions set out in the
Council’s Best Value Action Plan since the last quarterly update on 27 August
2024.
1.2 This report is submitted to Committee in terms of paragraph III B (41) of the
Council’s Scheme of Administration, Best Value being a cross-cutting issue
that does not fall within the remit of a particular committee.
2. RECOMMENDATION
2.1 It is recommended that the Committee reviews and notes the progress
made against the actions in the Council’s Best Value Action Plan
(Appendix 1).
3. BACKGROUND
3.1 Councils in Scotland have a statutory duty to demonstrate Best Value,
introduced in the Local Government (Scotland) Act 2003.  Statutory Guidance
defines Best Value as: 
ensuring that there is good governance and effective management of
resources, with a focus on continuous improvement, to deliver the best
possible outcomes for the public.
3.2 In March 2020 the Scottish Government published refreshed Best Value
guidance requiring councils to demonstrate a focus on continuous
improvement in performance around seven themes:
 Vision and leadership
 Governance and accountability
 Effective use of resources
 Partnerships and collaborative working
 Working with communities
 Sustainability
Item 8.
Page 51

Page 52

 Fairness and equality
3.3 The Corporate Committee on 23 April 2024 agreed a new Best Value Action
Plan that set outs the Council’s priorities for the next 3 years to enable it to
meet its Best Value duty (paragraph 6 of the minute refers).  The plan takes
account of and supersedes the consolidated list of improvement actions which
bring together recommendations from a number of sources in relation to the
Council’s progress in achieving its Best Value duty and the output from the
Council-Wide Strategic Self-Assessment of Performance by both councillors
and officers.
3.4 The Committee also agreed that the Best Value Action plan will be monitored
on a quarterly basis and Appendix 1 provides the quarterly monitoring of the
actions in the Plan for August to October 2024.  As well as reporting to
Committee, arrangements are in place to ensure that the Corporate
Management Team has regular oversight of performance monitoring of
progress on the actions in the plan to ensure that work is prioritised and early
remedial action can be taken if required.
3.5 Progress is on target in implementing the actions in the Best Value Action
plan with a number of actions being concluded and key highlights in progress
as noted below:
i) Public communication and engagement: the Council approved a
refreshed engagement strategy in September which is being implemented
with a range of activities planned for October and November to influence
financial planning.  Relevant progress is reflected in Appendix 1 against
the Vision and Leadership, Effective Use of Resources and Working with
Communities themes.
ii) Financial management - Development of savings plan for short to
medium term and the Review of Reserves Policy (September 2024) were
reported to Council 25 September 2024.  The review of Capital Plan
(September 2024) and operation of a cap along with a further update on the
short to medium term financial plan was reported to the Council on 22
October 2024.
iii) Transformation Strategy update and development of next set of
projects was reported to Council in August.  A further update report is on
agenda for this committee to ensure regular oversight and monitoring.
iv) Following the work of the Workforce Working Group, the Workforce
Strategy and Plan were approved by Corporate Committee on 27 August
2024 and so this is completed.
v) Sustainable development – a draft statement has been framed and is
on the agenda for this committee.
3.6 The Best Value Action Plan sets out an ambitious programme of work and it is
important to maintain pace to ensure that targets are delivered.  The next
planned stages of work over the coming quarter are noted against each of the
actions in the progress update (Appendix 1).  Highlights of actions due to be
Page 52

Page 53

reported during the next committee cycle to Corporate Committee (CC) on
28 January or Full Council (FC) as appropriate are noted below:
Vision and Leadership
i) Leadership development – proposals are under development (Dec
2024) – CC January 2025
Effective Use of Resources
i) The Review of Asset Management Strategy, which comprises the
Corporate Asset Management Plan (CAMP) and Capital Strategy 
(September 2024) – FC December 2024
ii) Medium to Long Term Financial Plan – FC December 2024.
iii) Next stage of short to medium term financial planning – FC January
2025
iv) Transformation strategy – development of expanded set of projects and
financial benefits (December 2024) - FC/CC as required January 2025
Community and Partner Engagement
i) Consultation on specific budget proposals (Nov/Dec) – Full council
January 2025
3.7 It is also of note that the Annual Audit Review has been completed and was
reported to the Council at its meeting on 22 October 2024.  The actions from
the annual audit will be captured in a future update to ensure the Best Value
Action plan remains comprehensive and current.
4. SUMMARY OF IMPLICATIONS
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The Best Value Action Plan supports the Council to deliver the priorities
in the corporate plan and supports the council values of Improving: drive
improvement; Ambitious: ensure sustainable and efficient services; and
Responsive: promote community participation and involvement and
involve our communities.
(b) Policy and Legal
The Best Value Action Plan supports the Council to fulfil its statutory duty
to demonstrate Best Value, introduced in the Local Government
(Scotland) Act 2003.
(c) Financial implications
There are no specific financial implications, however, the Best Value
Action Plan supports the Council in its duty to make best use of
resources and there are a number of specific actions that relate to
financial management that are moving forward.
Page 53

Page 54

(d) Risk Implications
There are risks associated with not making adequate progress on the
actions set out in the Best Value Action Plan.  The Council has had
feedback from a number of external stakeholders that identified areas for
improvement and failure to address these through the planned actions is
likely to lead to adverse reporting and implications for the council.
Several of the Best Value themes feature on the Council’s Corporate
Risk Register including leadership, financial sustainability and workforce
development.  Progressing the actions in the Plan will also secure
improvements in the management of these risks.
(e) Staffing Implications
There are no specific staffing implications arising from this report.
(f) Property
None
(g) Equalities/Socio Economic Impact
This is covered in the Best Value inspection regime itself and the
Council’s duty to deliver best value.
(h) Climate Change and Biodiversity Impacts
This is a key component of Best Value
(i) Consultations
Extended CMT (E/CMT) have contributed to the progress monitoring set
out in Appendix 1.
5. CONCLUSION
5.1 This report provides the quarterly monitoring of the Council’s Best Value
Action Plan (Appendix 1) for August to October 2024.  Progress
continues to be made across all of the areas of the plan with a number of
areas where actions have been completed and work continues to ensure
the plan is completed on target.
5.2 It is also of note that the annual audit review has been completed and
was reported to the Council at its meeting on 22 October 2024.  The
actions from the annual audit will be captured in a future update to
ensure the Best Value Action plan remains comprehensive and current.
Author of Report: Denise Whitworth
Background Papers: Corporate Committee report on Best Value Action plan
23 April 2024 (item 5a)
Corporate Committee report on 27August 2024 Best
Value Action Plan (item 11)
Ref: SPMAN-1108985784-1023
Page 54

Page 55

06ef99be-14d9-4147-a481-371e07a89a9a.xlsx - Summary
Page 1 of 1
Report Date 11-05-24
BRAGG Status - KEY BLACK -
Completed
RED -
Concern
AMBER -
Caution
GREEN On
Target
GREY - Not
Started
Lead Officer Priority Delivery Date Schedule % Complete
BEST VALUE ACTION PLAN Aug-26 GREEN 56%
1. Vision and Leadership Mar-26 GREEN 49%
1.1 Collaborative Leadership - ensuring members and officers work effectively to secure  CEx/Council (CL) 1 Dec-24 GREEN 43%
1.2  Community and Partner Engagement on Council priorities DCE (ECOD) 3 Jun-25 GREEN 28%
1.3 Leadership Development Action H HR,ICT & OD 1 Dec-24 GREEN 50%
1.4 Continuous Improvement – implement self-evaluation. CEx / DCE (ECOD) 2 Mar-26 GREEN 23%
1.5 Performance Reporting DCE (ECOD) 3 Jun-24 Complete 100%
Summary:  Work is progressing as planned on collaborative leadership with the external consultant work completed and report to  Corporate Committee in August setting out
progress and planned next steps.  Community Planning and engagement is in the early stages of planning and work to review the role of the community engagement group for
community planning is well progressed and due to be reported to the CPB.  Leadership development action is progressing with a draft strategy and plan scheduled for Corporate
Committee on 5 November and E/CMT consultation taking place.  Implementation of self-evaluation to deliver continuous improvement is progressing with the re-activation of the
PSIF process moving forward and planned work with the Improvement Service to support delivery. The Council agreed an updated engagement strategy for financial planning in
September 2024 and this is being implemented with information and engagement activity planned through October and November for reporting to the council to inform and influence
financial planning.  All actions within this BV theme are currently on target.
2. Governance and Accountability Jan-25 GREEN 57%
2.1 Effective Scrutiny HoGSP 3 Oct-24 GREEN 80%
2.2 Sound Governance Cex 1 Jan-25 Not Started 58%
2.3 Risk Management HoGSP E April 24 /  25* GREEN 75%
2.4 Digital Resilience Management H HR,ICT & OD E Sept 25* GREEN 15%
Summary: The 6 month review of scrutiny training is not yet due. Under the Risk Management project, the annual review of departmental risk registers that feed wider risks into
Corporate Risk Register is complete as is the work on the corporate overview of business continuity and resilience which was reported to committee in April 2024.Work on business
continuity is progressing as planned.  Work on digital resilience is progressing with the first stage of the Board level desktop exercise completed and preparation for the next phase
of workforce training and awareness in the final stages of preparation.
3. Effective Use of Resources Aug-26 GREEN 60%
3.1 Transformation and Sustainable Services CEx / DCE (ECOD) 1 Aug-26 GREEN 49%
3.2 Workforce Planning CEx 2 Sep-24 GREEN 87%
3.3 Financial Management CEx / DCE (EEF) / 1 Dec-24 GREEN 46%
Summary:  The refresh and refocus of the Transformation Strategy is complete and was approved by the Council in April 2024.  A further update was presented to the Council in
August 2024, with further definition of the strategy and including development of new projects. Work is also well progressed on developing planned project which following a
member workshop are nearing readiness for reporting and progress  continues on active projects. On workforce, the workforce working group has completed its planned work to
update workforce strategy and this was reported in August. The capital plan is at the early stages of review under the Financial Management project and the Revised Short to
Medium Term Financial Strategy is complete and was reported to Council on 26 June 2024. Preparatory work is underway for the remaining actions and is currently on target.  
Corporate Workforce Strategy and Plan agreed at Corporate Committee on 27 August and is now being implemented as part of normal HR-OD work.
4. Partnerships and Collaborative Working Oct-25 #REF! 23%
4.1 Partnership Working for Moray DCE (EEF / ECOD) 2 Oct-25 #REF! 23%
Summary: Work with community planning partners is moving forward to develop shared priorities for the LOIP and there is early indicative support to develop a single Moray plan. 
Locality plans are well developed and ongoing and consideration is now planned of learning across partners and service areas to identify opportunities for learning and greater
impact from partners working more closely
5. Working With Communities Jun-25 GREEN 19%
5.1 Community Budget Engagement ensuring local communities are more in Participatory DCE (EEF / ECOD) 2 Jun-25 GREEN 19%
Summary:  Guide to mainstream PB developed by CSU and circulated to all services.  Consideration is being given to the use of online tools and website enhancement to support
engagement.  Work to review the operation of the Community Engagement Group has been completed and considered by the Group and will be taken to the CPB for discussion
and consideration of future approaches. £109,000 via UK shared prosperity fund was allocated via PB to eligible arts, culture and heritage groups (July 24).  Progress is being made
in mainstreaming PB principles into the council's approach to financial planning.  Event scheduled for November 2024 as part of engagement work to encourage community
influence.
6. Sustainable Development Sep-24 GREEN 90%
6.1 Sustainable Development DCE (EEF) 3 Sep-24 GREEN 90%
Summary: Progress has been made in mapping the Council Corporate strategies relevant to sustainable development  against National Performance Indicators and corporate
priorities; identify areas of focus 2024-2029, SD changes expected and PIs to monitor progress; finalise draft principles. It is planned to bring this forward for wider consultation and
involvement on the sustainability statement.
7. Fairness & Equality Normal business GREEN 95%
7.1 Equalities Action HoGSP 2 Normal business GREEN 95%
Summary:  This workstream is well advanced and the planned actions are complete for: equality and socio-economic duty actions and consideration of these within committee
reports; Integrated Impact Assessments were carried out on budget proposals and the views of equality groups were sought where appropriate. The remaining action is for staff
training on equalities and the council equalities as an employer and this is underway and on target.  Further refinement of the paper on sponsored eLearning has been carried out.
Item 8.
Page 55

Page 56

Page 56

Page 57

REPORT TO: CORPORATE COMMITTEE ON 5 NOVEMBER 2024
SUBJECT: CORPORATE RISK REGISTER - UPDATE
BY: DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT)
1. REASON FOR REPORT
1.1 To provide the Committee with the quarterly overview of the Council’s
principal risks as detailed in the Corporate Risk Register.
1.2 This report is submitted to Committee in terms of Section III (B) (36) of the
Council's Scheme of Administration relating to council wide or corporate risk
assessment and the mitigation and management of these risks.
2. RECOMMENDATION
2.1 It is recommended that Committee considers and approves the overview
update on the Council’s principal risks as at October 2024 attached as
Appendix 1 to this report.
3. BACKGROUND
3.1 The Committee last reviewed the Corporate Risk Register at its meeting on 23
April 2024 (paragraph 9 of the minute refers). It was agreed subsequently as
part of the Best Value Action Plan that updates on the principal risks facing
the council would be provided to this Committee at quarterly intervals with a
full risk register updated annually.
3.2 The last quarterly review covered the period to 31 July 2024. This latest
update covers the period to the end of October 2024, albeit it has been
necessary to prepare the report prior to the month-end to meet committee
reporting deadlines. The next quarterly update to the end of January will be
reported to the meeting of this Committee on 22 April 2025 with the full
register being presented at the meeting scheduled to take place on 10 June
2025.
3.3 There has been considerable activity in the last quarter as the council moves
at pace to address the issues raised in its Best Value Action Plan; all of which
ultimately are designed to mitigate risk. While the focus is on the specific
recommendations made for this council, the public sector in general and local
government specifically are facing significant challenges. Notable in the
Item 9.
Page 57

Page 58

reporting period is an Accounts Commission report entitled: Transformation in
councils – Sector lead change and collaboration to achieve financial
sustainability (link). The report highlights a number of significant risks across
the sector and sets out the Commission’s expectations of the local
government sector, working in conjunction with community planning and third
sector partners and the Scottish Government.
3.4 Since the update provided in August, work has been undertaken to address
the risk themes referenced in the Corporate Risk Register.This work has been
positive in addressing the risks the council faces but for most themes, given
the challenges ahead, it is too soon to revise the risk scores at this time.
Some risks remain at a significant level despite mitigating actions being taken
and it is unlikely these will reduce significantly in the near term without a
fundamental shift in how services are funded and delivered not only in Moray
but across the public sector. The Accounts Commission has set out its
expectations in this regard, but in recent weeks differences of opinion
between Scottish Government and councils have been reported re. the future
of the national care services and on funding linked to maintaining teacher
numbers. So the challenges ahead are significant and management of risk will
be important as key decisions are taken.          
3.5 The latest overview update on the council’s principal risks is attached as
Appendix 1.  Attention is drawn to following higher scoring risks: 
3.6 Finance: In line with the Best Value Action plan, update reports have been
provided to Council on the financial position and a savings delivery plan
agreed. This plan will inform transformation proposals through a programme
of engagement, consulting and informing in the lead up to budget setting for
2025/26. Because of continuing uncertainty relative to future financial
settlements and demands on available resources, financial risk remains at the
highest level, scoring 25 (likelihood 5 x impact 5).
3.7 HR (Staffing): A recurring theme in working with services on service risks is
the difficulty in recruitment of certain staff groups and the impact this can have
on service delivery. The council in seeking to mitigate this has agreed an
updated workforce plan that was developed with the input of the workforce
working group. The plan details priority actions designed to develop skills and
capacity while ensuring the health and wellbeing of staff at a time of
uncertainty and change. A review of management structures is also being
taken forward and a plan established to recruit to a number of senior posts
currently filled on an interim basis. The risk score is unchanged at 20
(likelihood 5 x impact 4).
3.8 ICT (Technological): Effective use of technology is a key to ensuring the
council functions with optimum efficiency. Hence there is a need to embrace
new opportunities while at the same time remaining alert to the threats of
disruption and the impact such disruption could have on service delivery. Data
security is of key importance with reports prepared and considered during the
period on information governance and on replacement of the social care data
recording system. Modular training has also been provided to staff to raise
awareness of risks from inappropriate use that may lead to unauthorised
access or disruption to systems. These external threats are manifold and
Page 58

Page 59

difficult to fully mitigate; despite controls residual risk is assessed as high
remaining at a score of 20 (likelihood 4 x Impact 5).
3.9 Operational Continuity and Performance: This risk was previously neutral but
has been increased to high given observations within a number of services.
Essentially this risk is about managing expectations at a time of change.
Should there be necessity to scale back on service delivery there will need to
be clarity around consequences. This has been made clear in recent
committee reports including, for example, on changes to grass cutting
arrangements for social housing. Other issues are being highlighted in service
risk registers; capacity to deliver winter maintenance plans being an essential
consideration. These risks and others are under active review, and with the
call nationally for the pace of transformation to be increased, it is considered
the risk impacts on operational continuity and expected performance levels
should be elevated. Previously this risk was assessed as neutral, (likelihood 3
x impact 3) the assessment now is that it should be increased to 16 (likelihood
4 x impact 4).
3.10 For the remaining risk themes, risk scores relating to Environmental Issues
have been reduced, given that the council has a good awareness of the
environmental challenges emerging, albeit ambition may yet be impacted by
funding availability. With the risk register now being updated quarterly there is
the opportunity to review all risks regularly and make revisions where
appropriate, recognising that the assessment of overall trends in some cases
will require a longer view to be taken. The risk scores for all other risk themes
remain unchanged.
4 SUMMARY OF IMPLICATIONS
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Effective risk management practices are necessary to evidence how the
Council identifies and seeks to address any issues that may impact on
its ability to deliver its stated priorities and plans.
(b) Policy and Legal
Robust risk management practice is an essential component of good
governance.
(c) Financial implications
The risk register recognises the financial challenges facing the
council and the importance of addressing these. There are no direct
financial implications arising from this report.
(d) Risk Implications
Risk and its management is the subject of this report.
(e) Staffing Implications
No direct implications
(f) Property
No direct implications.
Page 59

Page 60

(g) Equalities/Socio Economic Impact
No direct implications.
(h) Climate Change and Biodiversity Impacts
The risk register refers to climate change considerations under
Environmental Risks. No direct implications.
(i) Consultations
The Corporate Management Team have participated in this latest
overview of the risk themes identified in the Corporate Risk Register.
5. CONCLUSION
5.1 The Committee is asked to consider and approve the latest evaluation of
higher scoring risk themes in the Corporate Risk Register as at October
2024.
Author of Report: Alasdair McEachan, Head of Governance, Strategy and
Performance.
Background Papers: Corporate Risk Register - April 2024
Ref: SPMAN-1108985784-1024
Page 60

Page 61

Appendix 1
Moray Council - Corporate Risk Register
Overview of changes in period to 31 October 2024
Based on 5x5 Matrix = Highest risk score 25
Risk
Theme
Residual
Risk Score
July 24
Current work/ Impacts Commentary Indicative
risk score
October 24
Higher
scoring risks
Financial 25
(Likelihood 5
x Impact 5)
 Annual Accounts audit completed
satisfactorily for financial year 23/24
 Quarterly monitoring of revenue budgets
for period to 30 June 2024 and reported to
appropriate committees.
 Capital plan updates reported to
Corporate Committee and Council; cap on
capital spend agreed for 2025/26.
 Financial Reserves policy reviewed and
approved.
 Treasury management report
acknowledged the need for proactive
management of investments and debt.
 Detailed Savings delivery plan presented,
and approach agreed to ‘engage, consult,
and inform’ in lead up to budget setting for
2025/26.
 Savings delivery plan highlighted two risks
relating to 1) savings from budget not all
The council in line with its best
value action plan has taken
steps in the past quarter to set
out its approach to mitigating
financial risk through delivering
further savings through
transformation and reform of
services. With multiple risk
factors identified where the
outcomes are as yet unknown
the financial risk score remains
unchanged at the highest
level.
25 (5 x 5)
Item 9.
Page 61

Page 62

within council’s control relating to funding
of the MIJB and 2) uncertainty unknowns
including SG funding, pay awards, price
inflation, interest rates and emerging
pressures.
 HSCM agreed package of service
reductions to achieve savings;
consultation on-going which is likely to
take some time and meet resistance from
those impacted by change. Service
demands increasing.
 Transformation strategy update provided
to council highlighting risks from change,
need for appropriate governance
arrangements, adequate resourcing and
the need to manage dependencies and
inter dependencies arising in
consequence.
 Developer obligations guidance relative to
significant planning applications reviewed
and updated noting complexities and
financial risks if not managed correctly.
 Burial charges reviewed for those out of
area applications to generate enhanced
cost recovery for the service.
HR (staffing) 20 (5 x 4)  Workforce and Organisational
Development strategy and plan for 2024-
27 updated and approved. Priorities set
including leadership capacity, workforce
planning and change, and staff health and
wellbeing but challenging with HR and OD
resources stretched.
Refreshed Workforce and
Organisation Development
Plan provides clarity on
priorities for staffing, however
reports to the Council and
service committees in the past
quarter present a recurring
theme of capacity to deliver as
20 (5 x 4)
Page 62

Page 63

 Annual Chief Social Work Officer report
noted challenges in recruitment and
retention of staff and interim
arrangements for senior leadership posts
as risks to service development and
continuity.
 Staff resources in social care
commissioning may delay timescales and
outcomes from current programme of
reviews.
 Grass cutting policy for social housing
under review to address staffing/cost
considerations.
 Housing DLO monitoring report notes
multiple hard-to-fill vacancies across
skilled trades.
 Continued recruitment challenges in
teaching increases risk that despite
planned work to deliver on the National
Improvement Framework, the council is
unable to fully address the poverty related
attainment gap
a consequence of staffing
issues.
Likelihood of staffing
challenges remains at the
highest level and the impact of
same remains high -overall the
risk score remains unchanged.
ICT 20 (4 x 5)  ICT and Digital strategy being refreshed
including reference to Digital Maturity
Assessment and digital development
opportunities including use of Artificial
Intelligence. Significant additional work
will be required.
 Continued increase in volume of daily
threat warnings for cyber security as well
as human error creates significant risks of
disruption. Activity to monitor and mitigate
this risk is ongoing.
This risk remains high as a
consequence of external
threats and the impact that
interruption to ICT services
would have on the
organisation.
Risk score is unchanged.
20 (4 x 5)
Page 63

Page 64

 Modular training for staff in cyber and data
security provided to raise awareness of
key risks. 
Operational
Continuity and
Performance
9 (3 x 3)  Operational continuity and performance
may be affected as a consequence of
service re-design.
 Agreed to improve timeliness of
performance monitoring as part of BV
action plan, with Public Performance
report for 2023/24 published in June
2024.
 Risk to overall continuity of service
delivery and to performance of services
as a consequence of change.
Work with services notes
elevated risks in several areas
that the likelihood of service
continuity being disrupted as a
result of reduced staffing levels
is a possibility if expectations
remain unchanged. In
consequence this risk has
been elevated with both
likelihood and impact
increasing from neutral (3x3)
to high (4x4). It is recognised
that current service standards
will require consideration
alongside any changes to
resourcing of services.
16 (4 x 4)
Collaborative
Leadership
12 (3 x 4)  Collaborative Leadership Development
Work being progressed in line with
recommendations made by external
adviser.
 Specific recommended actions being
implemented with further review of
progress in December 2024.
 Second tier governance documents
reviewed with updated guidance on
Councillor/Officer relations and for
Councillors on Outside Bodies.
This risk being addressed as
part of the Best Value Action
plan has been progressed with
the external adviser reporting
significant improvement.
Further planned improvements
are in progress to sustain a
collegiate approach to decision
-making, acknowledging the
challenges senior leaders will
face as the council goes
through a period of significant
change. No change in the risk
score is currently proposed.
12 (3 x 4)
Lower
scoring risks
Page 64

Page 65

Environment 12(4 x 3)  Housing Land Audit completed to meet
planning obligations and provide data to
support future decision making on
transport infrastructure requirements,
health care needs and school roll
forecasts.
 Conservation area status reviewed for
several communities in Moray.
 Proposals presented to council for a
Forres Conservation Heritage scheme
currently in preparation and with
opportunity to draw in external funding.
Five year programme.
 Local Heat and Energy Efficiency Strategy
approved, should enable access to
government funding opportunities going
forward.
 Affordable Housing Funding update
reported to committee noting risks linked
to Scottish Government funding and
planning for development with partners of
new affordable housing.
 LED replacement programme agreed to
secure energy efficiency benefits as well
as reduce costs and improve lighting for
working and learning.
 Installation of solar photovoltaic panels to
be undertaken on three council building
where optimal cost/benefit arrangements
apply.
 Nature restoration funding expenditure
incurred to improve biodiversity – part of
five year initiative attracting external
funding running to 2025/26.
Environmental impacts are
recognised across the council
as significant. Positive
initiatives are being taken
forward with available funding
being targeted accordingly.
The ability to maintain
progress on these and similar
initiatives remains challenging,
and will require to be aligned
to funding available from both
council and external sources.
Immediate risk is being
managed through agreeing
what needs to be done, but
longer term challenges are
likely to remain.
In terms of determining a risk
score for the council the risk is
primarily financial; in
environmental terms the
council’s commitment is clear
and multi-faceted. Accordingly
the risk score has been
reduced downwards with both
likelihood and impact
assessed as neutral 3 giving a
combined risk score of 9.
9 (3 x 3)
Page 65

Page 66

 External funding for school estate
improvements predicated on new builds
being to energy efficient standards.
 Various active travel initiatives promoted
including expansion of M-Connect.
 Energy efficiency standards for social
housing (EESSH) considered as part of
Housing Investment plan.
 Coastal adaptation plans approved.
 EV charging strategy being taken forward
to accommodate expanding council fleet of
electric vehicles.
 Climate adaptation plans under
consideration for all services.
Regulatory 9 (3 x 3)  Potential issues may arise should cuts
have greater impacts than previously on
statutory services.
 Information Governance review identified
areas of progress and good performance.
 Archiving of records and data storage
highlighted as risk issues in terms of
meeting Public Records legislative
requirements.
 Tenant participation engagement carried
out to inform annual return on compliance
with the Scottish Social Housing Charter
to the Scottish Housing Regulator. 
 Risks over implementation of new areas
of regulatory activity including short term
lets and implementation of the United
Nations Convention on the Rights of the
Child.
 Sustainable Learning Estate Engagement
continuing with consultation in Keith Area
Assessed as appropriate to
leave as is for now, albeit with
close monitoring of the impact
of any policy changes where
these may impact on
regulatory compliance.
9 (3 X 3)
Page 66

Page 67

School Group recently concluded to
inform school estate planning.
 Proposal to close Crossroads Primary
being progressed in line with statutory
process.
 Social Care service user recording system
being upgraded to improve working and
reporting practices while maintaining data
security.
 Slight risk of increased non-compliance
with policy regulations and practice if
service delivery more challenging.
 Overall assessment is that council has
standards of governance that support
compliance with regulatory requirements.
Reputational 10 (5 x 2)  Best Value and Budget reductions
continue to have potential for a major
impact on reputation.
 Any diminution in services tends to attract
criticism from those impacted.
 Hard to gauge wider impact of inspection
reports where these are critical in nature.
Likelihood previously was
assessed as very high given
council requirement to consult
on multiple issues. While this
informs decision making and
engenders ownership it
invariably leads to criticism
from those whose expectations
are unmet. The impact of
service reductions on the
council’s reputation is likely to
influence this risk score going
forward.
Overall score meantime is
unchanged.
10 (5 x 2)
Economic
Sustainability
8 (2 x 4)  Growth Deal projects being progressed.
Separate Risk register maintained to
highlight potential impediments to project
delivery and mitigating actions.
With the interventions
described here council is
fulfilling its role.
Assessment is to leave risk
score as is with likelihood low
8 (2 x 4)
Page 67

Page 68

 Planning Committee notified of a number
of potential significant planning
applications coming forward from the
private sector indicating planned
investment in business expansion,
housing and environmental initiatives.
 Annual report on the council’s industrial
portfolio while outlining a number of risks
shows overall good performance. 
 Opportunities to utilise other funding
streams e.g. for town centre
redevelopment, levelling-up fund and just
transition fund.
 Continued working with partners to deliver
the ten year strategy through revised
governance model and ways of working
for Moray Economic Partnership.
 Promotion of apprenticeships, developing
the young workforce and similar initiatives
in place.
 Childcare Action Plan in preparation.
 Poverty data analysis shows extent of
localised poverty in Moray and response
actions developed and agreed.
 Partnership Community Learning and
Development plan updated to prioritise
needs of young people and adults with
barriers to learning or opportunities. 
at two but leave impact at four
as issues remain in some
areas e.g. attracting key
workers into Moray and
provision of childcare.
Page 68

Page 69

REPORT TO: CORPORATE COMMITTEE ON 5 NOVEMBER 2024
SUBJECT: PROPERTY PERFORMANCE INDICATORS
BY: DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMNET AND
FINANCE)
1. REASON FOR REPORT
1.1 To inform the Committee of the performance of the Council’s property assets
and provide an update to Committee of the current performance indicators.
1.2 This report is submitted to Committee in terms of Section III B (28) of the
Council's Scheme of Administration relating to asset management.
2. RECOMMENDATION
2.1 It is recommended that the Committee consider and note the reporting
of these initial property performance indicators.
3. BACKGROUND
3.1 On 12 December 2018, the Council approved a report which detailed
recommendations aimed at improving how the Council manages and
maintains its property assets (para 6 of Minute refers), with updates on the
actions provided to various committees since then.
3.2 At the meeting of this Committee on 11 June 2024, an update on each of the
remaining actions was provided along with details of how property
performance indicators would be developed and implemented. This report is
the first reporting of these performance indicators (para 15 of the minute
refers).
3.3 The table below lists each indicator as outlined within the Committee report of
June with the figure for 2022/23 and 2023/24 financial years for information.
Item 10.
Page 69

Page 70

Indicator 2022/23 2023/24
Annual electricity
consumption (kWh)
11,475,718 11,481,741
Annual gas
consumption (kWh)
23,675,047 22,875,985
Annual scope 1 carbon
emissions from
operational estate
(Co2e)
5,135 4,828
Annual maintenance
spend Learning Estate
£1,099,852 £1,167,812
Annual maintenance
spend on corporate
estate
£751,885 £722,153
Annual capital spend on
Learning Estate BB
upgrade
£2,850,000 £2,875,000
Gross internal floor area
of operational property
estate (m2)
221,564 215,719
Gross income from
Industrial Portfolio
£2,085,000 £2,269,000
Occupation of industrial
portfolio as % of
floorspace
90.19% 95.35%
3.4 Energy Consumption – The performance indicators in relation to energy
usage detail total consumption for all operational properties for the financial
year stated. There is an Energy strategy with an aim to minimise energy
consumption. These indicators will be monitored to show progress in
minimising energy consumption. More details on the consumption of energy
are provided in the annual report on Energy Strategy/Actions which was last
reported to the Economic Development and Infrastructure Services (ED&IS)
Committee on 14 November 2023 (para 13 of the minute refers) and is due to
be reported again to that Committee on 12 November 2024.
3.5 Carbon Emissions – The performance indicator above details the total
Scope 1 carbon emissions associated with the Council’s building related
operations. The figure above is provided in tonnes of CO2. Scope 1 carbon
emissions are direct emissions from onsite fuel combustion and in this case,
they come from gas, oil and biomass boilers used to heat our buildings and
water. In order to meet the Council’s Net Zero target, it is these scope 1
emissions that need to be prioritised for reduction. This report will show
progress in reducing carbon emissions however the annual report on Energy
Strategy/Actions which was last reported to the ED&IS Committee on 14
November 2023 (para 13 of the minute refers and is due to be reported again
to that Committee on 12 November 2024 will provide more detail including
actions being taken to undertake this reduction.
3.6 Annual Maintenance Spend – The indicators above provide details of the
annual maintenance revenue expenditure in relation to repair and
maintenance of the Learning Estate and the rest of the Corporate Estate.
Page 70

Page 71

These figures include the cost of all cyclical maintenance to ensure the
properties are statutorily compliant, all planned revenue maintenance and all
reactive maintenance. The recording of these figures will show trends of
spending and will allow member monitoring of spend against the size of the
estate when considering the overall floor area of the property estate.
3.7 Annual capital spend on Learning Estate BB upgrade – The Learning
Estate consists of 53 schools – 8 secondary schools and 45 primary schools. 
Over the last 2 years fabric and component surveys have been undertaken to
update the core condition ratings of the buildings in accordance with the
Scottish Government requirement to update every 5 years. Updating is nearly
complete with the programme due to complete in quarter 1 2025. Two schools
(3.7%) are categorised as Condition D (Bad) and 30 schools as Condition C
(Poor) (56.6%) – below the minimum B condition standard mandated by
Scottish Government. A further 9 schools, that have an overall Condition B
(satisfactory) category, have significant C and some D category condition
components, and fall within 5% of an overall C condition categorisation and a
preventative maintenance regime is considered a key strategic requirement to
ensure these schools do not deteriorate further.
3.8 The capital spend over the last 24 months and planned for the next 15 years
is phased work that has, and will, focus on the priority core elements - roofs,
walls, windows, doors, electrical and mechanical (heating) – in schools with a
Condition D and C rating, other core elements where there is a medium/high
risk of full or partial failure, and works to ensure building standards
compliance.  This works has included East End windows and wall, Milnes
High School roof, Speyside High School mechanical, electrical and building
fabric improvements, Buckie High School security upgrades and drainage
improvements at a number of primary schools.
3.9 Gross Floor Area – This performance indicator details the total internal floor
area across the Council’s Learning and Corporate Estates. This will show if
the overall estate footprint is expanding or contracting and will be a useful
reference in attempts to ensure maximum utilisation of assets. As a general
principle it is expected with time that the floor area figure will decrease. This
figure can also be used to calculate the Council’s maintenance spend per
square metre which for 2023/24 was £5.41/sqm.
3.10 Industrial Portfolio – The performance indicators in relation to the industrial
portfolio show the gross income from the properties and also the percentage
of the total floor space which is occupied. In both cases we have seen an
increase in both in the last 12 months. More details on the performance of the
portfolio are provided in the annual Industrial Portfolio Report which is
reported to the ED&IS Committee. The most recent report was presented at
the 3 September Committee (para 10 of the draft minute refers).
4. SUMMARY OF IMPLICATIONS
(a) Corporate Plan 2024 - 2029
Within the Corporate Plan there are 3 priorities and this report feeds into
the priorities of Building Stronger Greener Vibrant Economy by helping
the Council monitor its energy consumption and carbon emissions and
also the priority of Build thriving, resilient, empowered communities by
Page 71

Page 72

assisting in the appropriate management of the Council’s properties
assets ensuring that the focus is to provide modern and sustainable
infrastructure that meet the needs of our communities.
(b) Policy and Legal
None
(c) Financial implications
This report has no specific financial implications.
(d) Risk Implications
There are no specific new risks outlined in this report.
(e) Staffing Implications
None.
(f) Property
There are no specific property implications in relation to this report
although it does provide information on how property assets are
performing.
(g) Equalities/Socio Economic Impact
There are no equalities/socio economic impacts arising from this report.
(h) Climate Change and Biodiversity Impacts
The importance of minimising the use of carbon and making our
properties as efficient as is viable is an underlying requirement for all
Asset Management decisions going forward. This report has no direct
Impacts. However, by highlighting our performance in relation to energy
usage and carbon usage this should help manage these factors better in
the future.
(i) Consultations
Consultations on this report have taken place with the Head of Housing
and Property Services, Chief Financial Officer, Andy Hall (Programme
Manager, Learning Estate), Legal Services Manager and the Democratic
Services Manager and any comments have been incorporated into the
report.
5. CONCLUSION
5.1 Full Council note the performance figures provided within the report and
note that with future year reports data trends and analysis will be
undertaken to compare and track progress in the management of Moray
Council’s property assets.
Author of Report: Neil Strachan, Property Asset Manager
Background Papers: None
Ref: SPMAN-1285234812-1672
Page 72

Page 73

-
REPORT TO: CORPORATE COMMITTEE ON 5 NOVEMBER 2024
SUBJECT: PERFORMANCE REPORT - FINANCIAL SERVICES – PERIOD
TO SEPTEMBER 2024
BY: DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE)
1. REASON FOR REPORT
1.1 To inform Committee of the performance of the service for the period to 30
September 2024.
1.2 This report is submitted to Committee in terms of Section III (A) (4) of the
Council's Scheme of Administration to monitor performance in accordance
with the Council’s Performance Management Framework.
2. RECOMMENDATION
2.1 It is recommended that Committee:
(i) scrutinises performance in the areas of Service Planning, Service
Performance and other related data to the end of September 2024;
and
(ii) notes the actions being taken to improve performance where
required.
3. BACKGROUND
3.1 On 7 August 2019, the Council approved a revised Performance Management
Framework for services (para 5 of the minute refers).
4. SERVICE PLANNING
4.1 Each service plan sets out the strategic and service level priorities and
outcomes it intends to deliver in the coming year aligning closely with financial
planning, corporate and community planning partnership strategic priorities. 
This report provides an interim update on progress on the service plan, key
outcomes and performance indicators.  Committee is invited to review
progress to secure assurance that is satisfactory and to provide scrutiny and
further direction where performance requires attention. 
Item 11.
Page 73

Page 74

4.2 Following approval of the Service Plan by Committee, a review of
performance indicators has been undertaken and amendments made to align
indicators with service outcomes.
4.3 The narrative included is by exception, links to Service Plan Actions and
Performance Indicators can be accessed within the Background Papers
section of this report. 
RAG
STRATEGIC
LEVEL
Strategic Framework; Financial Workforce,
Digital Transformation Strategies,
Performance Management Framework
23%
Implement legislative/regulatory change 0%
Implement the annual Procurement Strategic
Action Plan (PSAP) 20%
Implement the recommendations from the Annual
Audit Report 90%
Implement actions from the Corporate Asset
Management Plan 0%
Procurement Support for MIJB 75%
Increase Service Efficiency - Taxation 0%
Increase Service Efficiency - Accounts 0%
Increase Service Efficiency - Payments 100%
Health and Wellbeing 50%
30%
SERVICE PLAN OUTCOMES
COMMENT: At the end of September, an e-accounts payable form is
live while significant procurement support has been provided to the MIJB.
Although over target timescales, the implementation of  recommendations
from the Annual Audit Report is 90% complete and awaiting the Auditor's
review. Following completion of Audit work, focus will move to actions yet
to progress.
OVERALL PROGRESS
SERVICE
LEVEL
Strategic Outcomes – successes
4.4 Progress of Financial Planning work is on track with the refresh of the Short to
Medium Term Financial Plan complete and the Savings Delivery Plan and
Financial Reserves Policy agreed.  The approach to applying a cap on capital
expenditure was reported to the Special Moray Council meeting on 22
October 2024 (item 8 of the Agenda refers).  (Action FIN24-25 Strat 4.1)
Strategic Outcomes – challenges and actions to support
4.5 Development of partnership working with MIJB reports progress as 15%
complete against a due date of January 2025.  Monitoring systems are in
place between Chief Financial Officers and a first review of savings is
complete via budget monitoring reports.  (Action FIN24-25 Strat 4.2)
4.6 During quarter 1, the Community Support Unit finalised the Participatory
Budgeting process relating to the Shared Prosperity Fund.  With removal of
CSU support (following the 2024/25 budget review), new measures monitoring
Participatory Budgeting activity are to be developed.  (Action FIN24-25 Strat
4.3, PIs FS214-216, ERC006 and ERC006a)
Service Level Outcomes – successes
4.7 Significant progress has been made to support effective procurement for the
MIJB.  Most priority projects are complete with all others underway.  Further
discussions are required to identify next milestones with any new Health &
Social Care procurements to be dealt with as per the usual procurement
process.  (Action FIN24-25 Serv 5.5)
Page 74

Page 75

4.8 The planned e-Accounts Payable form, aimed at streamlining the timely
processing of invoices, is now live.  All departments have been advised and
use will be monitored going forward.  (Action FIN24-25 Serv 5.8)
Service Level Outcomes – challenges and actions to support
4.9 Three actions are yet to note any progress due to focus on the Annual Audit. 
Work on all is expected to commence during quarter 3.  (Actions FIN24-25
Serv 5.1, 5.4 and 5.7)
4.10 Implementing the actions from the last Annual Audit Report is 90% complete
within the due date of September 2024.  Reconciliation has been prepared
and awaiting the Auditor’s review of progress.  (Action FIN24-25 Serv 5.3)
5 SERVICE PERFORMANCE
5.1 In line with Performance Management Framework, operational performance is
monitored quarterly by departmental management.  Areas performing well
and/or areas subject to a decreasing trend or where benchmarking results
show performance below comparators will be reported to this Committee for
member scrutiny.
5.2 The narrative included is by exception, links to Service Performance
Indicators can be accessed within the Background Papers section of this
report. 
Operational Indicators – successes
5.3 Budget monitoring reports continue to be issued to managers within allocated
target timescales, ensuring information to maintain accurate financial planning
is available.  (PI FS008)
Operational Indicators – challenges and actions to support
5.4 During 2022/23, exceptionally high 10% penalty income recovered by Sheriff
Officers led to a fall in the annual Gross Cost of collecting Non-Domestic
Rates per property to £23.26.  Latest figures for 2023/24 show this penalty
income has declined with gross costs returning to a level seen prior to
2022/23 of £33.30 per property.  (PI FICT137)
Page 75

Page 76

6. OTHER PERFORMANCE RELATED DATA
Complaints and MP/MSP Enquiries
6.1 In line with the Performance Management Framework, complaints are
reviewed quarterly by departmental management in terms of time taken to
respond, outcome and learning points.  Detailed tables can be accessed
within the Background Papers section of this report.  
6.2 During the reporting period, Financial Services received 19 complaints and
closed 16.  15 (94%) were closed as frontline with 1 (6%) as investigative.  13
frontline complaints (81%) met the target timescale of 5 working days. 
6.3 A total of 13 complaints were upheld or partially upheld.  Due to resourcing
issues and an increased workload within the Service, customer enquiries have
taken longer than normal to process.  Work to address the backlog is ongoing
with staff reminded of recent changes to regulations and the need to take care
when providing advice. 
6.4 Between April and September, 9 MP/MSP enquiries have also been received
and dealt with by Financial Services.  Issues raised included Council Tax
exemptions and new charges for second homes. 
7 SUMMARY OF IMPLICATIONS
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Performance measurement is used to ensure the efficient and
sustainable delivery of services to meet the Council’s priorities in both
the Corporate Plan and the LOIP.
(b) Policy and Legal
The Council has a statutory requirement to publish a range of
information that will demonstrate that it is securing best value and assist
in comparing performance both over time and between authorities where
appropriate.
(c) Financial implications
None.
(d) Risk Implications
None.
(e) Staffing Implications
None.
(f) Property
None.
(g) Equalities/Socio Economic Impact
An Integrated Impact Assessment is not needed as this report is to
inform the Committee on performance.
Page 76

Page 77

(h) Climate Change and Biodiversity Impacts
None
(i) Consultations
The Depute Chief Executive (Economy, Environment and Finance), the
Chief Financial Officer, Service Managers, Legal Services and the
Democratic Services Manager have been consulted with any comments
received incorporated into this report.
8. CONCLUSION
8.1 At the end of September 2024, the Financial Services Service Plan is
30% complete.  Following completion of the Annual Audit, focus will
move to those actions yet to progress.
Author of Report: Suzanne Wilson, Research and Information Officer
Background Papers: Service Plan Actions
Service Plan Performance Indicators
Service Performance Indicators
Complaints Monitoring Report
Ref: SPMAN-1293228629-1161
Page 77

Page 78

Page 78

Page 79

REPORT TO: CORPORATE COMMITTEE ON 5 NOVEMBER 2024
SUBJECT: PERFORMANCE REPORT - GOVERNANCE, STRATEGY AND
PERFORMANCE – PERIOD TO SEPTEMBER 2024
BY: DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT)
1. REASON FOR REPORT
1.1 To inform the Committee of the performance of the service for the period to 30
September 2024.
1.2 This report is submitted to Committee in terms of Section III (A) (4) of the
Council’s Scheme of Administration to monitor performance in accordance
with the Council’s Performance Management Framework.
2. RECOMMENDATION
2.1 It is recommended that Committee:
(i) scrutinises performance in the areas of Service Planning, Service
Performance and other related data to the end of September 2024;
and
(ii) notes the actions being taken to improve performance where
required.
3. BACKGROUND
3.1 The Council, approved a revised Performance Management Framework for
services on 7 August 2019 (para 5 of the minute refers) which provides for
twice yearly reports to committee on service performance.
4. SERVICE PLANNING
4.1 Each service plan sets out the planned strategic and service level priorities
and outcomes it intends to deliver in the coming year aligning closely with
financial planning, corporate and community planning partnership strategic
priorities. This report provides an interim update on progress on the service
plan through key outcomes and performance indicators.   Committee is invited
to review progress to secure assurance that is satisfactory and to provide
scrutiny and further direction where performance requires attention.
Item 12.
Page 79

Page 80

4.2 The narrative included is by exception, links to Service Plan Actions and
Performance Indicators can be accessed within the Background Papers
section of this report.
RAG
STRATEGIC
LEVEL Continuous Improvement 56%
Digital Transformation and Efficiency 32%
Improved Governance 45%
Performance Management 20%
41%
SERVICE PLAN PRIORITIES
OVERALL PLAN PROGRESS
SERVICE
LEVEL
Service Plan: Overall progress at the end of September is
41%.  All actions have been progressed, with two strategic
actions completed.  Service actions around customer contact
and centralised means testing have not progressed as
planned due to competing priorities, however remain a focus
for future workload.
Performance Indicators: No strategic indicators
Comment
SERVICE PI'S
Achieving
Target
Within Target
Below Target
Data Only
0
Strategic Outcomes – successes
4.3 Planned work around governance and committee issues identified in
Collaborative Leadership have been completed with two further documents,
Guidance on External Bodies and Member Officer Relations approved.  Further
training for members of Audit and Scrutiny has been undertaken.  (GSP 2024-25
STRAT 1.4 & 1.5)
Strategic Outcomes – challenges and actions to support
4.4 There is some slippage around re-establishing a framework for Continuous
Improvement but work progresses having met with the Improvement Service
to inform approach on relaunch of Public Services Improvement Framework,
options to resource being further explored.  (GSP 2024-25 STRAT 1.1)
Service Level Outcomes - successes
4.5 The Benefits e-form is at the final stages of development (90%).  The e-form
will be tested internally from a user perspective. Feedback will inform when
the e-form can be made available to potential clients.  (GSP 2024-25 DT&E
1.4)
4.6 The transfer of burial grounds administration to Lands and Parks Service has
taken place.  The member of staff will move permanently to Lands and Parks
Service by 1 April 2025, following a transfer period from Registrars.  (GSP
2024-25 DT&E 1.6)
Service Level Outcomes – challenges and actions to support
4.7 Investigation and development of Artificial Intelligence (AI) opportunities for
Contact Centre channels has not progressed largely due to competing
priorities.  Discussions have taken place with potential providers to gain a
fuller understanding of opportunities available to the Council.  (GSP 2024-25
DT&E 1.1)
4.8 Initial scoping exercise investigating whether there is a viable case for further
centralisation of means testing is ongoing, having been delayed due to officer
leave. Questions have been raised with Social Care to determine whether
Page 80

Page 81

there is a potential business case. Awaiting feedback. (GPS 2024-25 DTE
1.5) 
5. SERVICE PERFORMANCE
5.1 In line with the Performance Management Framework, operational
performance is reviewed quarterly by departmental management.  Areas
performing well and/or areas subject to a decreasing trend or where
benchmarking results show performance significantly below comparators will
be reported to this committee for member scrutiny.
5.2 The narrative included is by exception, links to Service Performance
Indicators can be accessed within the Background Papers section of this
report.
Operational Indicators - challenges
5.3 The percentage of committee draft minutes issued by Committee Services on
time or early slipped below target during quarter 2, with 70% (7 out of 10) of
minutes issued within 5 working days against a target of 85%.  The dip in
performance was due to competing workloads and holiday leave over the
summer period.  It is anticipated that performance will improve over the
second half of the reporting year. (CS003)
5.4 The average number of days taken to process notifications of changes of
circumstances in housing benefits claims increased to just over 7 days at the
end of September, exceeding the 6 days target.  The delay in processing
claims was due to staffing issues over the summer period, with a vacant post
from May still to be filled combined with an increase in sick leave over the
period.  Processing performances will return to normal levels once staffing
issues are resolved. (CPS012)
5.4 Customer Services Call Centre has noted a marginal decrease in call volume
over the first half of 2024-25 compared to the same period last year. However,
the percentage of calls answered has decreased from 87.9% to 81.2%, albeit
there has been a slight improvement in performance from quarter 1 to quarter
2 this reporting year.  Performance remained below target (93%) throughout
2023-24 and continues to do so in 2024-25.  Call volumes and answer rates
are being monitored on a monthly basis to help identify potential areas for
improvement, however reduced staffing as part of budget savings continue to
impact on available resources to meet service targets.  The graph below
Page 81

Page 82

shows the call volume and answer rates over the last ten quarters. (PI
CPS058)
5.5 The percentage of answered calls that were answered within 60 seconds
improved in quarter 2 to 63.9%.  While up on the previous quarter (51.7%),
performance remains below the 75% target. A decrease in call volumes in the
quarter attributed to the 12% increase in calls answered within 60 seconds.
Average delay times also decreased by 61 seconds on the previous quarter,
however this was up by 9 seconds on the same quarter last year.  The graph
below shows call volume and answer rates within 60 seconds over the last ten
quarters. (PI CPS058a)
6. OTHER PERFORMANCE RELATED DATA
Complaints and MP/MSP Enquiries
6.1 In line with the Performance Management Framework, complaints are
reviewed quarterly by departmental management in terms of time taken to
respond, outcome and learning points.  Detailed tables can be accessed
within the Background Papers section of this report.
6.2 A total of eleven complaints were received during the first half of 2024/25, with
nine complaints closed. All complaints were resolved at Frontline stage. Two
Page 82

Page 83

complaints were upheld, two partially upheld and five were not upheld.  Two
complaints were resolved within the 5 working day target timescale, with the
overall average time taken to respond to complaints being 17 days.  Three of
the four upheld/partially upheld complaints related to Customer Services,
including delay in responding to initial enquiry and conduct of advisor when
speaking to customer. All were acknowledged with an apology and
reinforcement action dually taken.
6.3 Three MP/MSP enquiries were received during the first half of 2024/25 for
Governance, Strategy and Performance, all were responded to and closed.
6.4 Across the Council, over the last three years the Council have dealt with
1,530 non-statutory MP/MSP enquiries, in addition to over 1,500 statutory
complaints received over a similar period, that are subject to the Model
Complaints Handling Procedure (MCHP).  The following graph shows the
volume of enquiries received each quarter since quarter 3 2021/22.
6.5 The number MP/MSP enquiries have fallen each quarter over the last year,
with an average 128 enquiries received each quarter over the last three years.
Over 75% of enquiries were directed to Economy, Environment and Finance. 
All enquiries follow a similar process to that of complaints in being formally
logged and responded to.
7. SUMMARY OF IMPLICATIONS
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Performance measurement is used to ensure the efficient and
sustainable delivery of services to meet the Council’s priorities in both
the Corporate Plan and the LOIP.
(b) Policy and Legal
The Council has a statutory requirement to publish a range of
information that will demonstrate that it is securing best value and assist
in comparing performance both over time and between authorities where
appropriate.
Page 83

Page 84

(c) Financial implications
None.
(d) Risk Implications
None.
(e) Staffing Implications
None.
(f) Property
None.
(g) Equalities/Socio Economic Impact
An Integrated Impact Assessment is not needed as the report is to
inform the Committee on performance.
(h) Consultations
The Head of Governance, Strategy and Performance, Depute Chief
Executive (Education, Communities and Organisational Development),
Service Managers, Legal Services Manager and Democratic Services
Manager have been consulted with any comments received incorporated
into this report.
8. CONCLUSION
8.1 At the end of September 2024, overall progress against the service plan
for 2024/25 was 41% complete.  Several actions have been subject to
slippage due to lack of available resourcing and competing priorities,
but it is hoped the pace of progress will increase over the coming
quarter. 
Author of Report: Neil Stables, Research and Information Officer
Background Papers: Service Plan Actions
Service Performance Indicators
Service Complaints
Ref: SPMAN-2045703626-495
Page 84

Page 85

REPORT TO: CORPORATE COMMITTEE ON 5 NOVEMBER 2024
SUBJECT: PERFORMANCE REPORT (HUMAN RESOURCES,
INFORMATION COMMUNICATIONS TECHNOLOGY AND
ORGANISATIONAL DEVELOPMENT) – PERIOD TO SEPTEMBER
2024
BY: DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT)
1. REASON FOR REPORT
1.1 To inform the Committee of the performance of the service for the period to 30
September 2024.
1.2 This report is submitted to Committee in terms of Section III (A) (4) of the
Council's Scheme of Administration to monitor performance in accordance
with the Council’s Performance Management Framework.
2. RECOMMENDATION
2.1 It is recommended that Committee:
(i) scrutinises performance in the areas of Service Planning, Service
Performance and other related data to the end of September 2024;
and
(ii) notes the actions being taken to improve performance where
required.
3. BACKGROUND
3.1 On 7 August 2019, the Council approved a revised Performance Management
Framework for services (para 5 of the minute refers).
4. SERVICE PLANNING
4.1 Each service plan sets out the strategic and service level priorities and
outcomes it intends to deliver in the coming year aligning closely with financial
planning, corporate and community planning partnership strategic priorities. 
This report provides an interim update on progress on the service plan, key
outcomes and performance indicators.  Committee is invited to review
Item 13.
Page 85

Page 86

progress to secure assurance that is satisfactory and to provide scrutiny and
further direction where performance requires attention. 
4.2 Following approval of the Service Plan by Committee, a review of
performance indicators has been undertaken and amendments made to align
indicators with service outcomes
4.3 The narrative included is by exception, links to Service Plan Actions and
Performance Indicators can be accessed within the Background Papers
section of this report. 
HR & OD ICT
Workforce Transformation and
Change 50% n/a
Organisational Development 50% n/a
Communications and Engagement 50% n/a
Health & Wellbeing 40% 20%
Best Value Actions 50% 15%
Continuous Improvement 10% 10%
Transformation n/a 50%
Service Development n/a 5%
Assurance n/a 45%
Forward Planning n/a 5%
37%
SERVICE
LEVEL
COMMENT: At the end of September, actions for Human Resources
and Organisational Development have made good progress.  For ICT,
progress has been slower in some areas due to issues with third
party providers or resourcing.  Assurances have been received in
relation to bandwith across the school estate while other actions will
progress during quarter 3 following successful recruitment to the
Information Systems Manager post. 
SERVICE PLAN OUTCOMES
STRATEGIC
LEVEL
Strategic Framework; Financial,
Workforce, Digital, Transformation
Strategies.  Performance
Management Framework.
OVERALL PROGRESS 34%
Strategic Outcomes – successes
4.4 Following approval of the Workforce Planning Report and Strategy for 2024-
27 and analysis of the recruitment difficulties faced by various services,
recruitment and retention activities have been reviewed and updated to try to
address the issues identified.  As part of this a project plan has been drafted. 
This plan will address resourcing of the work required to ensure progress is a
phased approach based on available capacity.   This will be kept under
review, monitored and reported as part of the service management meetings
and within these regular performance reports.    (Action HROD24-25 Strat 4.2)
Strategic Outcomes – challenges and actions to support
4.5 With the new Information Systems Manager in post, work to develop and
implement a corporate data strategy to support key corporate priorities will
progress during quarter 3. (Action ICT24-25 Strat 4.2)
4.6 Improvements to the bandwidth across the school estate have been delayed
due to issues involving project management and technical design from third
party providers.  Work has recently progressed with assurances received of a
focus on key sites.  During quarter 3, ICT will prioritise confirming delivery
timescales for the project and will continue to assist schools dealing with
network constraints.  (Action ICT24-25 Strat 4.3)
Page 86

Page 87

Service Level Outcomes – challenges and actions to support
4.7 Service Plan actions relating to Service Development and Forward Planning
are reported with minimal progress at the end of quarter 2.  Although Service
Development work is longer-term (with a due date of March 2027), focus on
each action will improve following successful recruitment to the Information
Systems Manager post.  Both will also benefit from the development of a
council systems catalogue, aimed at simplifying the identification of required
system upgrades.  (Action ICT24-25 Serv 5.2 and Serv 5.4)
4.8 Increased cyber activity and other high priority remedial work has impacted on
the resourcing nevertheless progress has been made in a number of areas.  A
Cyber Incident Response workshop was delivered to Senior Management and
will be followed up with an incident response exercise; work at a national level
for a procurement framework will introduce essential monitoring capabilities
and continued participation with the Scottish Public Sector Cyber Resilience
Network ensures threat intelligence reports are received on a daily basis. 
(Action ICT24-25 Serv 5.5)
5 SERVICE PERFORMANCE
5.1 In line with Performance Management Framework, operational performance is
monitored quarterly by departmental management.  Areas performing well
and/or areas subject to a decreasing trend or where benchmarking results
show performance below comparators will be reported to this Committee for
member scrutiny.
5.2 The narrative included is by exception, links to Service Performance
Indicators can be accessed within the Background Papers section of this
report. 
Operational Indicators – successes
5.3 Both performance indicators relating to ICT infrastructure continue to be
reported at 100%.  During quarter 2, all 2906 help desk incidents were
resolved within target timescales.  Excluding a short period of planned
maintenance (lasting approx. 3 minutes), there has also been no disruption to
the availability of the Moray Council website.  (PIs ICT007 and ICT008)
Page 87

Page 88

Operational Indicators – challenges and actions to support
5.4 Violence and aggression declined during quarter 2 to 808 incidents however
remains above target (643).  Due to term times, Education data only relates to
the second half of the quarter however, compared to the same period last
year when total incidents were 809, reported violence and aggression within
Education has fallen by 4% from 716 to 690.  As noted in previous
performance reports, online forms have made reporting and analysis easier
while mandatory training covering a trauma-based approach has been
introduced.  Work is also ongoing to improve the support provided to school-
based staff when dealing with challenging behaviour, as part of the HR and
OD Service Plan 2024/25 Action 5.4 Health and Wellbeing.  (PI HROD006)
5.5 Working days lost have increased during quarter 2 to 47 due to one case of a
longer term absence.(PI HROD007)
6 OTHER PERFORMANCE RELATED DATA
Complaints and MP/MSP Enquiries
6.1 In line with the Performance Management Framework, complaints are
reviewed quarterly by departmental management in terms of time taken to
respond, outcome and learning points.  Detailed tables can be accessed
within the Background Papers section of this report.  
6.2 During the reporting period, HR, ICT and OD closed 1 frontline complaint
relating to the re-grading of posts.  This did not meet target timescales due to
complexity of the appeal process and was closed as Resolution.
6.3 Between April and September, 1 MP/MSP enquiry was received and dealt
with by HR, ICT and OD regarding employment issues.
7 SUMMARY OF IMPLICATIONS
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Performance measurement is used to ensure the efficient and
sustainable delivery of services to meet the Council’s priorities in both
the Corporate Plan and the LOIP.
(b) Policy and Legal
The Council has a statutory requirement to publish a range of
information that will demonstrate that it is securing best value and assist
in comparing performance both over time and between authorities where
appropriate.
(c) Financial implications
None.
(d) Risk Implications
None.
(e) Staffing Implications
None.
Page 88

Page 89

(f) Property
None.
(g) Equalities/Socio Economic Impact
An Integrated Impact Assessment is not needed because the report is to
inform the Committee on performance.
(h) Climate Change and Biodiversity Impacts
None
(i) Consultations
Depute Chief Executive (Education, Communities and Organisational
Development), Head of HR, ICT and Organisational Development,
Service Managers and the Democratic Services Manager have been
consulted with any comments received incorporated into this report.
8. CONCLUSIONS
8.1 At the end of September 2024, the Human Resources, ICT and
Organisational Development Service Plan is 34% complete.  With some
resourcing issues and third-party delays addressed, progress is
expected across all actions during the remaining quarters of 2024/25.
Author of Report: Suzanne Wilson, Research and Information Officer
Background Papers: Service Plan Actions
Service Plan Performance Indicators
Service Performance Indicators
Complaints Monitoring Report
Page 89

Page 90

Page 90

Page 91

REPORT TO: CORPORATE COMMITTEE ON 5 NOVEMBER  2024
SUBJECT: ARMED FORCES COVENANT GOLD AWARD UPDATE
BY: DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT)
1. REASON FOR REPORT
1.1 The Committee is invited to consider and approve the request to amend policy
to ensure maintaining the Armed Forces Covenant Gold Award as a result of
the essential criteria for the award becoming more defined.
1.2 This report is submitted to Committee in terms of Section B (24) Section (a) to
(c) and Section B (25) of the Council's Scheme of Administration relating to
the formulation, implementation and review of policies and practices for
Council employees.
2. RECOMMENDATION
2.1 The Committee is asked to consider and approve the amendment to the
Special Leave Policy set out at paragraph 3.5 in the report.
3. BACKGROUND
3.1 The Council was awarded Armed Forces Covenant Employer Recognition
Scheme Gold Award in July 2023. To achieve this award the council was
required to demonstrate that it met a range of essential and desirable criteria
that demonstrated its commitment to supporting the Armed Forces community
and how it advocates for others to do the same.
3.2 The criteria includes demonstrating armed forces friendly employment
policies, partnership working, supporting and promoting armed forces events
and attending career fair events to name but a few examples. The Council
was also required to indicate approximately how many employees worked for
the defence as Reservists, Veterans and Cadet Force Adult Volunteers and to
indicate how many military spouses were employed. The council is currently
working towards creating a process to be able to identify this part of the
workforce more accurately.  Additionally the Council had to meet the criteria of
offering paid leave to those employees who were required to attend annual
training from which their normal pay and allowances for the period of the
training camp was deducted.
Item 14.
Page 91

Page 92

3.3 The Council was able to demonstrate and meet the criteria and therefore
awarded the Gold Award.
3.4 A more stringent approach is now being taken to the application of the
essential criteria for the Gold Award and as such the Council’s current
provisions under the Special Leave Policy for attendance at annual training no
longer align with the essential criteria and the position requires to be reviewed
in order to maintain the Gold Award.  The current and proposed position are
outlined below.
3.5 Table 1 sets out the proposed amendment to the Special Leave Policy:
Special
Leave Policy
Description
Current
Provision
1. Employees who are members of the non-regular
forces and attend an annual training camp for a
period of not less than a week should be granted
special leave with pay equal to the period which the
employee actually attends the training camp, but not
exceeding a period of fifteen working days and
subject to the deduction of service pay and
allowances received in respect of the period of
special leave.
Proposed
Provision
2. Employees who are members of the non-regular
forces and attend an annual training camp for a
period of not less than a week should be granted
special leave with pay equal to the period which the
employee actually attends the training camp, but not
exceeding a period of fifteen working days with no
deduction of normal pay.
3.6 The SJC Red Book /COSLA contains the National Agreement on Pay and
Conditions of Service for Local Government Employees. The current provision
with regards to this element indicate ‘Councils should produce and publish a
policy detailing leave available, with or without pay, to support work life
balance and covering leave for National, Public, Community Service and
Reserve Forces’. Therefore the discretion to agree an alternative approach to
special leave rests with the Council.
3.7 It is difficult to quantify the cost of this change as an employee who is also a
member of the non-regular forces can work within any service and grade in
the council.   However, currently requests for special leave to attend training 
are approximately 2 applications per year.  Therefore, based on this, it is
considered that the proposed position comes with a minimal cost
consideration for the Council. The change is that there will be no recovery of
cost based on the employee’s military pay, so they will receive both their
normal pay from the Council and any allowances provided for by the military.
In addition there is the indirect cost in terms of loss of productivity or
replacement employee costs during their leave of absence for a period up to
15 days, which is not a change from the current policy position.  
Page 92

Page 93

4. SUMMARY OF IMPLICATIONS
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The work noted in this report supports the Council in achieving the
objectives and priorities in the Corporate and 10 Year Plan and sets out
how the Council will meet the challenges in making best use of our
workforce and resources. In particular, the actions will ensure continued
progress towards the Council’s commitment to be a good employer.
(b) Policy and Legal
There are no policy and legal implications arising from this report.
(c) Financial implications
There are no financial implications arising from this report.
(d) Risk Implications
There are no risk implications arising from this report other than those
set out within the body of the report which indicate a risk to maintaining
the Gold Award status.
(e) Staffing Implications
There are no staffing implications arising from this report.
(f) Property
There are no property implications arising from this report.
(g) Equalities/Socio Economic Impact
There are no equalities/socio economic implications arising from this
report.
(h) Climate Change and Biodiversity Impacts
There are no climate change or biodiversity impacts arising from this
report.
(i) Consultations
Consultation has taken place with the Regional Employer Engagement
Director, Highland Reserves Forces and Cadets Association.  The policy
amendment has been discussed with Trades Union representatives for
Scottish Joint Council employees, Craft Operatives and Teachers. 
Following the meeting of the Committee, items will be submitted for
update to the relevant Trade Union / Officer groups.
5. CONCLUSION
5.1 The ERS Gold Award is a significant achievement for the council and
given the Armed Forces footprint in Moray maintaining this award
demonstrates our commitment and support for the Defence and Armed
Forces. The amendment to the Special Leave Policy as proposed will
ensure the Council maintains this position and remains up to date and
relevant based on the priorities within the Corporate Workforce Plan and
Page 93

Page 94

the strategic direction of the Council with regards to being an employer
of choice.
Author of Report: Anne Smith, Senior OD Adviser
Background Papers:
Page 94

Page 95

REPORT TO: CORPORATE COMMTTEE 5 NOVEMBER 2024
SUBJECT: SUSTAINABLE DEVELOPMENT STATEMENT
BY                     DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE)
1. REASON FOR REPORT
1.1 To seek approval of the Sustainable Development Statement as required in
terms of the Best Value Action Plan.
1.2 This report is submitted to Committee in terms of Section III (B) (41) of the
Council's Scheme of Administration relating to the formulation and review of
Council wide policy, strategies, priorities and objectives.
2. RECOMMENDATION
2.1 It is recommended that the Committee consider and approve the
Sustainable Development Statement as set out in Appendix 1 to the
report, noting that this will complete action 6.1 in the Corporate Best
Value Action Plan 2024-2027.
3. BACKGROUND
3.1 The duty of Best Value held by all public bodies covers seven themes
intended to provide strategic focus on continuous improvement, two of which
are cross-cutting, namely equality and sustainability, otherwise termed
“sustainable development”.  Governmental guidance defines this as “securing
a balance of social, economic and environmental wellbeing in the impact of
activities and decisions, and seeking to meet the needs of the present without
compromising the ability of future generations to meet their own needs”.
Sustainable development is a fundamental part of Best Value and it should be
reflected in a local authority’s vision and strategic priorities, highlighted in
plans at corporate and service level and a guiding principle for all its activities.
In a meeting on 11 June 2024 the Council approved its Best Value Action
Plan (para 3 of the minute refers) and in section 6.1 of that Action Plan the
Council undertook to develop a Sustainable Development Statement that
draws together the range of work the Council has in place to deliver
sustainability, identifying any gaps that require consideration and action. This
Statement is now produced at Appendix 1.
Item 15.
Page 95

Page 96

3.2 In line with Best Value guidance, the Statement draws out the way in which
sustainable development is embedded in the Corporate Plan 2024-2029 and
wider corporate policies and strategies. In particular the Statement:
 Outlines the role of the Corporate vision and values in creating a
culture focussed on sustainable development, with clear guiding
principles to support this.
 Exemplifies how sustainable development is integrated into corporate
priorities, key strategies, plans and governance systems.
 Sets out how the impact of sustainable development in relation to key
economic, social and environmental issues will be measured,
evaluated, reported and scrutinised.
3.3 The Statement also identifies some gaps in current activity which require to be
addressed in the short to medium term (by December 2025) to more fully
comply with Best Value guidance, with five actions identified to progress over
that time frame. These will be incorporated into the next iteration of the Best
Value Action Plan. A review of the Statement will be undertaken as part of the
Climate Strategy 2020-2030 Review to progress during 2024/25 and aiming to
conclude with a report in December 2025. That review will incorporate a more
expansive look at climate change including the social and economic impacts
of sustainability as well as the environmental impacts. Appendix 1 to the
Statement makes it clear that activity in all 3 realms is already ongoing, but
the review will consolidate and update that activity, also considering further
gaps to be addressed as the revised Climate and Sustainable Development
Strategy is finalised in 2025. 
3.4 The Statement has been drafted and reviewed in discussion with the Strategic
Leadership Forum. In addition, a cross-party group of members met in
September 2024 to discuss any issues and concerns relative to the Statement
and the current iteration has been broadly supported via both these
processes.
3.5 Future progress in regard to the Statement will be reported through Best
Value quarterly updates, performance reporting to service committees from
Quarter 4 and through annual reports such as the Annual Corporate Plan
report and Public Performance report. 
4. SUMMARY OF IMPLICATIONS
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Sustainable development is embedded in the Corporate Plan and related
strategies and policies as shown in Appendix 1 to the Statement. Work
with partners and the wider community to consider the role of
sustainable development in the LOIP and in the Community Planning
arena will begin shortly.
(b) Policy and Legal
Sustainable development is reflected in a range of corporate policies and
is part of the duty of Best Value held by the Council.  It must also be
embedded in corporate governance.
Page 96

Page 97

(c) Financial implications
There are no direct financial implications from this report, but sustainable
development must be reflected in the council’s financial planning and
resource allocation processes.
(d) Risk Implications
The Statement is required to demonstrate compliance with Best Value
duties as it sets out a framework for compliance. Failure to provide/clarify
such a framework risks reputational damage for the council as a result of
adverse inspection fundings.
(e) Staffing Implications
There are no direct staffing implications, with much of the future work
being included in planned activity to review the Climate Change Strategy
2020-2030.
(f) Property
There are no direct property implications.
(g) Equalities/Socio Economic Impact
Sustainable development is a cross-cutting aspect of Best Value like
equality including socio-economic aspects and so the implications
section of reports in this section and the Climate Change and
Biodiversity Impacts section will be reviewed and updated by the end of
2024.
(h) Climate Change and Biodiversity Impacts
Sustainable development is a cross-cutting aspect of Best Value like
equality and so the implications section of reports in this section and the
Equalities/Socio Economic Impact section will be reviewed and updated.
Ensuring that decisions are taken in the interests of current and future
generations, through application of a sustainable development approach,
will ensure that impacts on climate and biodiversity are considered
appropriately.
(i) Consultations
Consultations have been carried out with ECMT, Strategic Leadership
Forum and a cross-party group of members as well as with the Climate
Champion and the Council’s climate change strategy officers.
5. CONCLUSION
5.1 Sustainable development is a fundamental aspect of Best Value and the
Sustainable Development Statement provides a framework by reference
to which the council may demonstrate its compliance with this duty.
Further work will be done in this area as part of the review of the Climate
Strategy 202-2030. 
Author of Report: Rhona Gunn, Depute Chief Executive (Economy,
Environment and Finance)
Page 97

Page 98

Background Papers:
Ref: SPMAN-813460984-668 / SPMAN-813460984-669
Page 98

Page 99

APPENDIX 1
Draft Sustainable Development Statement
Introduction
All Public Sector Bodies (PSBs) must demonstrate how they are progressing sustainable
development as part of their Best Value duties, ensuring that sustainable development is:
 reflected in their vision and strategic priorities
 embedded in their governance arrangements
 contributed to in the way resources are planned and used
 effectively promoted through partnership working
Statutory guidance on Best Value states that to demonstrate a culture focussed on
sustainable development, there should be a framework to facilitate integration into policies,
plans and decisions, clear guiding principles and a range of measures to demonstrate
impact in the context of a wider performance management approach where there is
corporate accountability for delivery.
This Statement sets out the way in which Sustainable Development is currently reflected for
Moray Council in line with this guidance, drawing out the wider framework to support
integration into our policies, plans and decisions.
Further development work will be done as part of the review of the Climate Change Strategy
2020-2030 due to commence in 2024 for reporting in 2025. The content has been informed
by the Corporate Best Value Self-Evaluation undertaken in 2024 in which the governance
and guiding principles set out above were assessed as well developed with other areas as in
development.
Item 15.
Page 99

Page 100

What is Sustainable Development?
In 2015 the United Nations adopted 17 global Sustainable Development Goals (SDGs –
United Nations Sustainable Development Goals) intended to act as a call to action to end
poverty, protect the planet and ensure that by 2030 all people enjoy peace and prosperity.
Sustainable development means meeting the needs of the present without compromising
the ability of future generations to meet their own needs.
The SDGs are interconnected and in Scotland are localised and implemented through the
National Performance Framework (NPF).
This Statement reflects the SDGs with further development to be undertaken in the context
of the Climate Strategy 2020-2030 review which will include consideration of how the wider
concept of sustainable development fits into that strategy.
Page 100

Page 101

Sustainable Development Principles and Strategic Priorities for 2024-2029
Through the Corporate Plan 2024-2029 and underpinning Service Plans, the Council sets
out how sustainable development is embedded in our priorities. This is detailed in Appendix
A. Whilst Appendix A has a focus specifically on sustainable development, the SDGs are
both all-embracing and interconnected, and as such, it should not be viewed as a
comprehensive statement of all current sustainable development activity, but rather selected
key actions which the Council has prioritised amongst many areas where sustainability is
part of daily service delivery such as our waste collection or flood management.
Using performance indicators drawn from the Corporate and Service Plans, Appendix A
helps to demonstrate the impact of sustainable development in relation to key economic,
social and environmental issues where the Council has committed to act.
In progressing these actions, the Council is guided by principles which reflect our corporate
vision:
 Our young people grow up safe, well-educated and reach their full potential
 People lead healthy lives and have access to quality care when they need it
 Our businesses and communities prosper
 Our natural environment thrives for the betterment of all
In adopting these principles, we are true to our values, including those which are most
deeply rooted in sustainable development (shown in bold type).
FAIR  Ambitious Improving Responsive
• Tackle
inequalities
• Treat people
fairly
• Promote
equalities and
awareness
• Consider our
impact on
others
• Be outward
looking
• Promote and
celebrate Moray
• Be a great place
to work
• Ensure
sustainable
and efficient
council
services
• Drive
improvement
• Encourage
innovation
• Take
commercial
opportunities
• Invest in
transforming
to meet future
needs
• Be open and
transparent
• Promote
community
participation
and
involvement
• Listen to and
involve our
communities
Looking beyond the actions set out in Appendix A or already embedded in daily service
delivery, some further short to medium term actions have been identified for  completion as
set out below to ensure that Best Value is achieved:
Page 101

Page 102

Aim Action Lead Officer Delivery Date
Embedded in
Governance
1. Review of Summary of
Implications Section of
Committee Reports to
ensure sustainable
development is
embedded within
proposals
2. Embed Framework
reporting in Quarterly
Performance Reports,
Annual Corporate Plan
report and Public
Performance Report
Head of
Economic
Growth and
Development and
Head of
Governance,
Strategy and
Performance
Strategy and
Performance
Manager and
Senior
Communications
Officer
December 2024
June 2025
Contributed
to in
Resource
Planning and
Use
3. Identify any further
sustainable development
gaps in Climate Strategy
Review with resources to
address
Head of
Economic
Growth and
Development
December 2025
Promoted
through
Partnership
Working
4. Scope out Partnership
interest in shared
Sustainable Development
priorities/actions in the
LOIP Review
Depute Chief
Executive
(Economy,
Environment and
Finance)
June 2025
Promoted
through
Partnership
Working
5. Consider and Embed
Community views on
sustainable development
in the revised Climate
Change Strategy
Head of
Economic
Growth and
Development
December 2025
Monitoring and Review
Moving forward beyond the existing strategic commitments set out in Appendix A, this
Statement will be reviewed as the 2024/25 Climate Change Strategy Review progresses and
the resultant changes are embedded in governance arrangements to guide decision-making,
resource allocation and service delivery, ensuring that the Council's actions align fully with
its vision and values in the context of an updated Climate Change Strategy. 
Sustainable development will be considered as part of the corporate annual Best Value Self-
Evaluation and the results will be incorporated into the next iteration of this Statement.
Page 102

Page 103

5
APPENDIX A
2024 Sustainable Development Goals - Delivery Framework
Corporate / Service Plan Actions & PIs
Action Status
Cancelled
Overdue; Neglected
Unassigned; Check Progress
Not Started; In Progress; Assigned
Completed
Action linked to Recovery and Renewal
Page 103

Page 104

6
SUSTAINABLE DEVELOPMENT GOALS
1. NO POVERTY
2. ZERO HUNGER
3. GOOD HEALTH AND WELL-BEING
4. QUALITY EDUCATION
SD
Focus
Corporate
Priority Source Actions Planned Outcome Outcome Measures Completion
Target
Lead Officer for
updates
Social Reduce
Poverty CP
Maximise household income by
working with partners to ensure
financial inclusion services have
maximum reach (CP Priority: Tackle
Poverty and Inequality)
Moray will have lower levels of child
poverty in line with national targets
CHN24 Proportion of children living in
Poverty (after housing costs) (CP Priority:
Tackle Poverty and Inequality) - LGBF
March 2025
Interim Chief
Officer
(H&SCM)
CHN14a Literacy and numeracy
attainment gap (P1, P4 and P7 combined)
(CP Priority: Tackle Poverty and
Inequality) - LGBF
Social Reduce
Poverty CP
Early intervention addressing whole
family well-being to ensure than
children can reach their full
potential (CP Priority: Tackle
Poverty and Inequality)
CHN14b Percentage point gap between
the least and most deprived pupils (CP
Priority: Tackle Poverty and Inequality) -
LGBF
March 2025 Head of
Education
Social Reduce
Poverty CP
Getting it right for every child so
that we continue to improve
attainment for all (CP Priority:
Tackle Poverty and Inequality)
Improved attainment at both Broad
General and Senior Phase identified
through ACEL and LGBF measures
CHN11Percentage of pupils entering
positive destinations (ASN leavers / LAC
leavers) (CP Priority: Tackle Poverty and
Inequality) - LGBF
March 2025 Head of
Education
Social SP EGD
Prepare community safety response
plan incorporating
recommendations from agreed
Annual Community Safety Report
(EGD25-5.7)
Reduce the number of anti-social
behaviour referrals
ENVDV269 Number of Anti-Social
Behaviour incidents recorded March 2025
Environmental
Heath &
Trading
Standards
Manager
Page 104

Page 105

7
SUSTAINABLE DEVELOPMENT GOALS
5. GENDER EQUALITY
6. CLEAN WATER AND SANITATION
7. AFFORDABLE AND CLEAN ENERGY
8. DECENT WORK AND ECONOMIC GROWTH
9. INDUSTRY, INNOVATION, AND INFRASTRUCTURE
10.REDUCED INEQUALITIES
SD Focus Corporate
Priority Source Actions Planned Outcome Outcome Measures Completion
Target
Lead Officer
for updates
Economic Wellbeing
Economy CP
Progress Moray Growth Deal: bring
the remaining Moray Growth Deal
projects into delivery (CP Priority:
Build Stronger Greener Vibrant
Economy)
Proportion of 16-29 year olds within
Moray Council (NRS Mid-Year)
March 2026
Interim
target
March 2025
–
7 of 8
projects in
delivery
Head of
Economic
Growth &
Development
Economic Wellbeing
Economy CP
Delivery of the Community Wealth
Building Strategy and Action Plan
(CP Priority: Build Stronger
Greener Vibrant Economy)
Retain and attract young people /
families to live and work in the area
Average gross weekly earnings (full-time
employees) (SLAED) March 2025
Head of
Economic
Growth &
Development
Economic Wellbeing
Economy CP
Improve access to fair work,
employment and training
opportunities (CP Priority: Build
Stronger Greener Vibrant
Economy)
Increase the number of people in Moray
benefitting from Fair Work
ECON8 Proportion of people earning less
than the living wage March 2025
Head of
Economic
Growth &
Development
Economic Wellbeing
Economy CP
Enable more people to work by
supporting access to affordable
childcare (CP Priority: Build
Stronger Greener Vibrant
Economy)
Minimise barriers to people working such
as childcare Gender Pay Gap March 2025
Head of
Economic
Growth &
Development
Page 105

Page 106

8
SD Focus Corporate
Priority Source Actions Planned Outcome Outcome Measures Completion
Target
Lead Officer
for updates
Economic SP EGD
RMNZ Building heat and electricity
– Scoping and research into
increased renewable energy
generation from Council buildings
and land (EGD25-5.6a)
Achievement of targets, indicators and
outcomes identified in Climate Chage
Action Plan to achieve Carbon Neutral by
2030
CO2 emissions area wide: emissions
within scope of LA per capita March 2025
Principal
Climate
Change
Strategy
Officer
Economic SP H&PS
Continue to reduce the carbon
impact arising from Housing and
Property Services (HP25-5.3)
Phased improvement of energy efficiency
within corporate buildings and housing
stock
% of houses meeting EESSH increased to be in
line with LA benchmark circa 90% March 2025 Property Asset
Manager
Page 106

Page 107

9
SUSTAINABLE DEVELOPMENT GOALS
11.SUSTAINABLE CITIES AND COMMUNITIES
12.RESPONSIBLE CONSUMPTION AND PRODUCTION
13.CLIMATE ACTION
14.LIFE BELOW WATER
15.LIFE ON LAND
16.PEACE, JUSTICE AND STRONG INSTITUTIONS
17.PARTNERSHIPS
SD Focus Corporate
Priority Source Actions Planned Outcome Outcome Measures Completion
Target
Lead Officer
for updates
No of empty properties and
vacant/derelict sites in the city centre
Environmental
Flourishing
Healthy
Communities
CP
Delivery of the Levelling Up
Fund elements of the Elgin
City Centre Masterplan (CP
Priority: Building thriving,
resilient, empowered
communities)
No of additional residential properties in
Elgin City Centre
March
2026
Strategic
Planning &
Development
Manager
Environmental
Flourishing
Healthy
Communities
CP
Delivery of Town centre
Improvement Plan Delivery
Programme (CP Priority:
Building thriving, resilient,
empowered communities)
More of the activities, services and plans
are influenced by the communities they
serve
ECON09 Town Vacancy Rates March
2025
Strategic
Planning &
Development
Manager
Environmental
Flourishing
Healthy
Communities
CP
Delivery of the Housing
Investment and Affordable
Housing Supply programmes
(CP Priority: Build thriving,
resilient, empowered
communities)
Increase in affordable housing available in
Moray
No of new supply social housing for rent
–
32 completions
119 site starts
March
2025
Housing
Strategy &
Development
Manager
Page 107

Page 108

10
SD Focus Corporate
Priority Source Actions Planned Outcome Outcome Measures Completion
Target
Lead Officer
for updates
Environmental
Flourishing
Healthy
Communities
CP
Tackle the affordability and
standard of our learning
estate to ensure sustainability
while meeting climate
requirements
The Council adapts and acts to the
impacts of climate change
March
2029
Programme
Manager
Education
Environmental SP EGD Prepare Climate Change
Routemap (EGD25-5.6d)
Achievement of targets, indicators and
outcomes identified in Climate Change
Action Plan to achieve Carbon Neutral by
2030
CLIM1 CO2 emissions area wide per capita
August
2024
Principal
Climate
Change
Strategy
Officer
Environmental SP
ERC
Support the engagement and
consultation work on service
specific projects
More of the activities, services and plans
are influenced by the communities they
serve
Percentage of people who agree with the
statement ‘I can influence decisions affecting
my local area’
June
2026
Communities
Service
Manager
Page 108

Page 109

11
Mapping of Sustainable Development Goals to Key Strategies
Sustainable
Development
Focus
Sustainable Development Goal Corporate Priority Relevant Strategies/Plans
Social 1. No poverty
2. Zero hunger
3. Good health and well-being
4. Quality education
Tackle Poverty and
Inequality
Children’s Services Plan 2023-2026,
Moray Education National Improvement Framework
Plan 2024-2025
Community Safety Strategy 2022-2026
Economic 5. Gender equality
6. Clean water and sanitation
7. Affordable and clean energy
8. Decent work and economic growth
9. Industry, innovation, and infrastructure
10. Reduced inequalities
Build Stronger, Greener
Vibrant Economy
Moray Economic Strategy 2022-2032
Community Wealth Building Strategy 2024
Climate Change Strategy 2020-2030
Nature and Biodiversity Position Statement 2023
Partnership Community Learning & Development
Plan 2024-2027
Moray Pathways Local Employability Partnership
Delivery Plan 2022-2025
Environmental 11. Sustainable cities and communities
12. Responsible consumption and
production
13. Climate action
14. Life below water
15. Life on land
Build Thriving, Resilient,
Empowered
Communities
Learning Estate Strategy 2022-2032
Partnership Community Learning & Development
Plan 2024-2027
Elgin City Centre Masterplan
Town Centre Improvement Plans
Climate Change Strategy 2020-2030
Page 109

Page 110

12
Sustainable
Development
Focus
Sustainable Development Goal Corporate Priority Relevant Strategies/Plans
16. Peace, justice and strong
institutions
17. Partnerships
Nature and Biodiversity Position Statement 2023
LHEES Strategy & Delivery Plan
Climate Change Strategy 2020-2030
Moray Economic Strategy 2022
Moray Local Housing Strategy 2019-2024
Community Wealth Building Strategy 2024
Page 110

Page 111

REPORT TO: CORPORATE COMMITTEE 5 NOVEMBER 2024
SUBJECT: TRANSFORMATION STRATEGY DEVELOPMENT – PROGRESS
MONITORING
BY: DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT)
1. REASON FOR REPORT
1.1 To ask the Committee to consider and note progress on the delivery of the
Council’s Transformation Strategy as part of the ongoing monitoring of
progress.
1.2 This report is submitted to the Committee in terms of Section III (A) 2 of the
Council's Scheme of Administration relating to considering Capital and
Revenue Budgets and long-term financial plans.
2. RECOMMENDATIONS
2.1 It is recommended that the Committee considers and notes progress on
the delivery of the Council’s Transformation Strategy.
3. BACKGROUND
3.1 The Council at its meeting on 24 April 2024 agreed the first iteration of a new,
developing Council Transformation Strategy to take forward a continued focus
on delivering transformation projects already in progress, accelerate and
expand where there is opportunity and develop new areas of work to support
the council’s financial sustainability, providing a sound foundation for future
transformation work (para 9 of the minute refers)
3.2 The Strategy agreed in April 2024 is made up of a programme of projects to
continue the council’s transformation journey.  These are categorised as new,
innovation, additional, expansion and current.  An update to the Strategy,
including the development of new projects was agreed by the Council on 13
August 2024 (para 9 of the minute refers)
3.3 Appendix 1 gives an update of progress on specific projects to show the
development work that has taken place since the last update report in August.
A summary of key points is given as follows.
Item 16.
Page 111

Page 112

i) Leisure review – externally commissioned review on leisure services
has progressed with report due for end of October and information has
been received on the future maintenance of Moray Leisure Centre to
enable a holistic view of future leisure services to be reported early in
2025.
ii) Libraries review – Council on 22 October 2024 approved proposals for
future service design within a lower overall budget to offer future
sustainability.  These will proceed for consultation during November
and December.
iii) ASN review – change management, training and arrangements for the
alternative curriculum have all moved forward as planned.
iv) Learning estate – progress on engagement plan and decision taken
regarding the future of Crossroads Primary School at ECLS Committee
on 17 September.
v) Out of Hours services – business case has been finalised and was
presented to the council on 22 October 2024.
vi) Smarter working – phase 1 has been completed releasing 3 properties
and Phase 2 is underway to deliver further savings from relocation into
the HQ campus.
vii) Depot review – outline business case was approved at ED&I
Committee on 30 April and work is in progress to develop a full
business case for reporting in March 2025.
3.4 The progress tracking in Appendix 1 identifies that a number of projects are
reaching a stage where they will be ready to report early in 2025 which will
assure the continued development and definition of the council’s programme
of transformatiom work over the planned 12 month period set out in the
Strategy.  Specifically, reports are planned on Leisure review, Workforce
review and Learning estate review.  Work is also continuing on the definition
and development of further transformation projects with a project on use of
council Vehicles at the concept definition stage and a proposed update to the
Digital Strategy in preparation.
3.5 However, there is a small number of projects where progress has been less
consistent and these are highlighted as red or amber on the schedule in
Appendix 1.  These are mainly due to issues of resourcing, either where
arrangements are yet to be put in place or where limited specialist resources
had to be diverted to operational priorities to ensure service continuity.  These
include: schools business administration, schools digital and service efficiency
lean project. 
3.6 To improve these areas, recruitment is planned for the Business
Administration project which will enable progress to be made over the coming
months and internal resourcing arrangements have been reviewed in ICT to
provide ongoing support to work on improving schools connectivity.
Page 112

Page 113

3.7 The learning estate work is amber for different reasons related to the
challenges of budget pressures for capital projects of this nature and
decisions that have affected the originally planned timescales, such as the
timing for LEIP 3 decision.  These latter points will be addressed through the
affordability work noted and a review of project timescale to take account of
the factors influencing progress.
3.8 The next Transformation Strategy update is planned to include consideration
of Stage 3 of the development of the council’s transformation strategy which 
recognises that further substantial work is necessary, including identifying
approaches that could be considered for the Future Council.  This will also
take account of the enabling potential of transformation work that could
underpin future change and efficiency and have indirect financial benefits,
ensuring the sustainability and effectiveness of council services for the future.
A members workshop will be planned in the new year to contribute to this
forward planning. This will focus on a pathway for further development and
further opportunities to work towards future council transformation.
4. SUMMARY OF IMPLICATIONS
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The new Transformation Strategy is the development of the council
commitment in the Corporate Plan to the values of Ambitious: ensuring
sustainable and efficient services; and Improving: drive improvement,
encourage innovation and invest in transforming to meeting future needs
and forms the Transformation Strategy referred to in the Strategic
Delivery Framework.
The transformation strategy and projects contribute to the Council’s
priorities of tackling poverty and inequality, building stronger greener
vibrant economy and building thriving, resilient empowered communities.
The projects also support the strategic delivery framework of the
financial strategy workforce strategy and digital strategy.
(b) Policy and Legal
None.
(c) Financial implications
The financial implications of the IMP have been approved in previous
reports.  The table below has been updated to include the changes
approved by the Council on 13 August 2024 and tracks the investment
and savings generated since the programme was started in 2018.
Page 113

Page 114

Cost 2018 to
2023
£000s
Cost 2023/2 4
£000s
Cost 2024/ 25
Cost 2025/ 26
Cost 2026/ 27
Actual
Savings 2018
to 2023
£000s
Savings
2023/24
£000s
Projected
future
savings
Total
projected
savings
£000s
IMP 925 179 918 361 986 2,263
BIM 11 - - - -
ASN Review 885 - - - -
Learning
Estate
22 37 37
School
Business
Admin
28
Educational
Attainment -
ASN
59
6
Just
Transition
30
(d) Risk Implications
The risks associated with the transformation programme are managed
through the relevant programme boards and overseen by E/CMT.  There
are no changes to the current risk profile and it is noted that, with
reporting of the first iteration of the new Transformation Strategy,
progress is being made in maintaining pace which has previously been
noted as a risk.  However, the risks associated with change and the
success of transformation remain and will continue to be monitored.
In order to manage these risks, the Council will:
(i) Ensure that all projects meet a given standard of governance that
is proportionate to the change.
(ii) Ensure there are adequate resources for the overall programme
of work and for individual projects.
(iii) Manage the dependencies and interdependencies across the
scope of the change and its implications for other areas of
prioritised work.
(iv) Appoint appropriate project resources and failing which, review
whether objectives are deliverable and review planned work
accordingly.
(e) Staffing Implications
There continue to be challenges in securing resources and service
capacity to progress projects.  However, the allocation of specific project
resources to specific projects is showing impact with projects such as
smarter working and learning estate showing good progress.  This
approach will be built upon as projects are identified and reach an
appropriate stage.  Resourcing at Council level including corporate
programme management and oversight will be revisited as the next
stages of the Transformation Strategy work emerges.
Page 114

Page 115

(f) Property
No direct implications from this report, although property is the subject of
one of the workstreams and is impacted by the Energy projects.  The
issues arising from this will be reported in due course with activity on
climate change being progressed as a stand-alone programme of
activity.
.
(g) Equalities/Socio Economic Impact
For the purposes of this report an Equality and a Socio Impact
Assessment are not required, however it is acknowledged that various
workstreams will identify change that will have an impact on equalities
and socio economic considerations and will be reported in due course.
(h) Climate Change and Biodiversity Impacts
There are no immediate climate change implications directly arising from
this report. However, the energy projects make a contribution to future
environmental sustainability and climate change. This is reported in the
report relating to these specific projects.
(i) Consultations
The Extended Corporate Management team have been involved in the
ongoing development of the transformation programme, including as the
project initiation board reviewing new mandates and driving forward
specific project work. They have contributed to the project updates in
Appendix 1.
5. CONCLUSION
5.1 The Transformation Strategy approved by the Council on 24 April 2024
and further developed by the Council on 13 August 2024, remains under
development and this report notes the progress made since August. The
next stage will be reporting of individual project  proposals and a further
progress update in early 2025.
Author of Report: Denise Whitworth, DCE ECOD
Background Papers: Reports updating on progress on Improvement and
Modernisation Programme to:
12 May 2021 Full Council (Item 09 Report and Appendix
A / B / C / D / E )
15 September 2021 Full Council (Item 15 Report and
Appendix 1 / 2 / 3)
15 March 2022 Corporate Committee (Item 13a Report
and Appendix)
30 August 2022 Corporate Committee (Item 06 Report
and Appendix )
25 April 2023 Corporate Committee (Item 08 Report and
Appendix)
7 November 2023 Corporate Committee (Item 07 Report
and Appendix 1 / 2)
Page 115

Page 116

23 April 2024 Corporate Committee (item 06 Report ) and
Appendix)
24 April 2024 Special Full Council (item 04 Report and
Appendix 1 and Appendix 2)
13 August 2024 Full Council (item 6a Report and
Appendix 1 and Appendix 2
Ref: SPMAN-1108985784-1026
Page 116

Page 117

SPMAN-1108985784-1027
Transformation Programme Update: to November 2024
Project
Titles: Phase
Schedule
Budget
Objectives
%
complete
Progress Update Next Steps
TRANSFORM EDUCATION
Leisure
Review Definition Not yet
developed
Moray Leisure services
external report due by end of
Oct 24.  Draft received has
vast information for
consideration – work on
future service options to be
considered in light of report.
Transformation Workshop to
consider future service
design – Sept 24 –
completed, future service
design considered at
Members Workshop on 21-08
-24
Review of external feasibility study
report
Report to Council on future options
Jan 25)
Libraries
Review Definition Not yet
developed
Council report considered at
council on 22-10-24 and
future service design
approved for consultation
Transformation Workshop to
consider future service
design – Sept 24 –
completed, future service
design considered at
Members Workshop on 21-08
-24
Public consultation on proposed
future service design (Nov/Jan 25)
Report to council for decision on
future service (by Feb 25)
Implementation of new service model
(by Oct 25)
Education HQ
Business
Admin Support
Team
Delivery GREEN GREEN GREEN
20 Project moved from definition
to delivery Savings have
been achieved through
vacancy management
Complete lean process review and
design new procedures
Item 16.
Page 117

Page 118

SPMAN-1108985784-1027
Transformation Programme Update: to November 2024
Project
Titles: Phase
Schedule
Budget
Objectives
%
complete
Progress Update Next Steps
Work commenced on
process review
Raising
Attainment:
Well-being
(ASN)
Delivery GREEN GREEN GREEN
40 Alternative Curriculum: 
flexible framework for the
alternative curriculum is
progressing well.
Applications are being
evaluated with a view to
acceptances by end October.
SEBN Change Management:
progressed with team
briefings and Trade union
consultation which concluded
on 7/10.  Necessary
adjustments to detail been
considered and staff
matching/
appointment/redeployment
processes progressing from
21/10 with a view to
implementation from 4
November
Mandatory training:
completed as planned
through time allocation at
start of term
ASN Parent engagement:
date for meeting with
Chair/Vice/ICE planned
Process for annual moderation to be
developed
Page 118

Page 119

SPMAN-1108985784-1027
Transformation Programme Update: to November 2024
Project
Titles: Phase
Schedule
Budget
Objectives
%
complete
Progress Update Next Steps
Business
Support for
Schools
(Schools
Business
Admin)
Delivery RED AMBER AMBER
65 Corporate Committee agreed
to allocate project officer
resource to support the
delivery of the project.  DAR
has been prepared and
recruitment will then take
place
Recruitment of project officer
Review of the project to address
feedback on both the Change
Management Plan and Improvement
Plan
Raising
Attainment:
Curriculum
Breadth -
Digital
Inclusion
Delivery RED GREEN GREEN
35 Overall Project Status RED:
work delayed due to
deployment of resources to
management of pressure on
network connections
- The procurement of
licences, professional
services, and training has
been completed.
- Initial workshops held with
the provider to identify best
practice for the
implementation
- The testing to enable iPads
to access internet-based
services has been completed
- Pilot of iPads for the fully
managed solution is
underway (devices for
Beechbrae, Buckie High
School, Lossie High School,
and Millbank Primary School
will be configured by
18/10/2024)
Targets for Next Period
-The next technical workshop is
scheduled for 22/10/2024
- Complete the enrolment of devices
to allow internet access – target date
is Nov 24
- Complete the implementation of
fully managed devices – target date
is Dec 24
Page 119

Page 120

SPMAN-1108985784-1027
Transformation Programme Update: to November 2024
Project
Titles: Phase
Schedule
Budget
Objectives
%
complete
Progress Update Next Steps
Schools for
Future -
Learning
Estate review
AMBER AMBER GREEN
5% Schedule remains amber
overall as there have been a
number of factors influencing
the originally planned
timescales.
o Findrassie – project is on
hold due to updated roll
forecasts, per ECLS
committee
o Forres Academy
–consultation re common
good in progress to mid
November for reporting by
Dec.  Work underway to
manage and ensure
affordability
o Buckie – affordability
within capital plan and
timing to be considered
o B-B Upgrade work –
timing to be adjusted for
affordability
o Crossroads –report
recommending formal
consultation on future
approved at ECLS
committee on 17-09-24
Budget and affordability are
an ongoing challenge with
this programme of work
ASG Engagement – Elgin
and Keith Associated school
groups (ASG) underway and
B-B programme work – progress first
group of schools for 24/25 roll out
ASG Engagement – Speyside ASG
to commence November.
Review of projects to take account of
capital plan affordability and
projected rolls (Feb 25)
Report to council on options for
acceleration of learning estate
rationalisation (Feb 25)
Page 120

Page 121

SPMAN-1108985784-1027
Transformation Programme Update: to November 2024
Project
Titles: Phase
Schedule
Budget
Objectives
%
complete
Progress Update Next Steps
Speyside also commencing. 
Forres and Buckie
progressed to next stages
Transformation Workshop
held 21-08-24 to consider
future of this project re
whether to accelerate and
extended to deliver fewer
Schools operating at greater
levels of occupancy and
efficiency.  Working group
now agreed by ECLS
Committee on 17/09/24 and
first meeting held 24/10/24
TRANSFORM COUNCIL
Digital
Services Research Not yet
developed
Digital strategy in draft and
scheduled for CMT
consideration and reporting
to committee in January 2025
Workshop facilitated by
Digital Office and Socitm held
on 3/7. 
Report to Committee January 2025
on proposed strategy
Service
Reviews Concept Not yet
developed
This area does not have
resource allocated and is
impacted by other workloads
Early discussion paper
prepared and further
development required.  May
present methodology to
advance emerging agendas
Management consideration of
concept and potential benefits
Page 121

Page 122

SPMAN-1108985784-1027
Transformation Programme Update: to November 2024
Project
Titles: Phase
Schedule
Budget
Objectives
%
complete
Progress Update Next Steps
such as digital, lean and
sustainability
Workforce
Changes Concept Not yet
developed
Proposed negotiating
strategy drafted and under
political consideration ahead
of reporting to council.
Further work to define
benefits underway
Outline business case being
prepared to establish as
project.
Transformation Workshop to
consider future of this project
held on 21-08-24
Report to council for direction on
proposed project (Jan 25)
Out of Hours
Services Definition Not yet
developed
Business case finalised and
approved at Council to
progress in October 2024.
Project mandate prepared
and agreed by CMT/SMT as
project initiation
Development of options in business
case as agreed by council
Customer
Service and
systems
support
Definition
Research
Not yet
developed
Business case completed for
replacement customer
relationship management
system and considered by
cmt/smt.  New Customer
Services Manager
appointment in progress
following retirement and will
be taken forward by new
postholder.
Page 122

Page 123

SPMAN-1108985784-1027
Transformation Programme Update: to November 2024
Project
Titles: Phase
Schedule
Budget
Objectives
%
complete
Progress Update Next Steps
Asset
Management
(was PAMA)
Delivery N/A £83K
£200K
Rev.
£250K
Cap.
saving
80
o Smarter
Working Delivery GREEN
Phase 2:
£105k
(revenue)
£60k
(capital)
GREEN
40 Phase 1 has now been
completed, vacating 9 North
Guildry Street, Elgin; 13
Cluny Square, Buckie; and
9C Southfield, Elgin. 
Phase 2 is underway, with a
further office rental already in
place and schedule of further
consolidation progressing.
Phase 2 will deliver further savings
from the relocation of employees to
vacant space within the HQ campus
from a number of other premises in
the Elgin area:
232-240 High Street (Registrars)
Beechbrae
10 Duffus Road
Ashgrove Depot portacabins
Additionally work is ongoing to
review the Business Gateway
premises at 17 High Street and to
explore options for Grampian
Valuation Joint Board.
o Depot
Review Definition GREEN
£76k
(revenue)
GREEN
GREEN
75 The Outline Business Case
was approved at ED&I
committee on 30 April 2024,
including budget to resource
development of the Full
Business Case.
A specialist consultant has been
appointed to undertake development
of the Full Business Case from
November 2024 and working to the
target delivery date of March 2025.
Property Asset
Mgmt. Stage 2
– Shared
Community
hubs for
public/3rd
sector
On hold
This is a second stage of the
PAMA work that is yet to be
scheduled.
Relative priority to be
reviewed following delivery of
stage 1 above. 
Where possible, shared use of
buildings with partners will be
incorporated into capital
developments on an ongoing basis
as opportunities arise
Page 123

Page 124

SPMAN-1108985784-1027
Transformation Programme Update: to November 2024
Project
Titles: Phase
Schedule
Budget
Objectives
%
complete
Progress Update Next Steps
Service
Efficiency –
Lean Reviews
Definition – on hold RED GREEN GREEN
25 This project is being re-
prioritised for the Future
Council work
Definition and Prioritisation of project
to be considered for next stage of
IMP/Future Council
TRANSFORM ECONOMY
Industrial
Estates Concept
Not yet
developed
Project mandate prepared
and approved by CMT/SMT.
A briefing on the content of
the mandate took place with
chair/vice chair of ED&I
committee to inform the
approach to future reporting.
As part of the Industrial
Portfolio Annual Report to
ED&I committee on 03
September 2024 approval
was given for the
recommendation to appoint a
Chartered Surveyor to
evaluate options with respect
to the property identified for
potential disposal.
Appointment of a Chartered Surveyor
is pending, further to which a report
with findings/recommendations will
go to ED&I committee by April 2025.
Vehicles (inc
pool cars) Concept Not yet
developed
Draft Concept Proposal prepared
for review at next available
Extended CMT meeting
Page 124

Page 125

SPMAN-1108985784-1027
Transformation Programme Update: to November 2024
Project
Titles: Phase
Schedule
Budget
Objectives
%
complete
Progress Update Next Steps
Net Zero –
Minimising
energy use
and carbon
emissions:
o LED
o Solar PV
Definition Not yet
developed
Project mandates prepared
focussed on Solar PV and
LED and approved by
CMT/SMT.
A report to Full Council on 13
August 2024 approved the
proposed approach to
upgrading lighting to LED and
installing solar panels on
corporate buildings.  
Engagement with the design team
and contractors has begun. Initially
looking at HQ, Annexe and Ashgrove
Depot.    
Proposals with costings are planned
on being submitted to Head of
Housing and Property Services and,
Chief Financial               Officer within
the month of October for approval.
This is in line with the delegated
authority.
Subject to approval, project will be
planned for construction phase
before financial year end.
BIM Implementation GREEN GREEN GREEN
Phases 1 and 2 have been
completed
Business Case was
considered at the
Transforming the Economy
Board and the FBC approved
at EDI in June 2024. Project
moving to initiation of next
stages.
Implementation Programme
developed for approval by
Transforming the Economy Board on
29 October 2024.
Procurement arrangements for BIM
Advisor appointment underway.
Key Stakeholders meetings held to
advise that BIM project approved by
Full Council and implementation
stage reached.
Engagement with Design Team and
Contractor on BIM Pilot Project
(Forres Academy Replacement) will
be arranged in line with the project
milestones.
Page 125

Page 126

Page 126

Page 127

REPORT TO: CORPORATE COMMITTEE ON 5 NOVEMBER 2024
SUBJECT: FLAG FLYING PROTOCOL
BY: DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT)
1. REASON FOR REPORT
1.1 This report seeks approval for an updated Flag Flying Policy.
1.2 This report is submitted to Committee in terms of Section III (B) (48) of the
Council's Scheme of Administration relating to making arrangements for
ceremonial matters and hospitality.
2. RECOMMENDATION
2.1 It is recommended that Committee:
(i) approve the updated Flag Flying Policy in Appendix 1; and
(ii) agree to its publication on the Council website within the Second
Tier Governance Documents.
3. BACKGROUND
3.1 At the meeting of Policy and Resources Committee on 4 June 2013 (para 12
of minute refers) a flag flying protocol was agreed in respect of which flags
should be flown on council buildings or war memorials including how events
such as deaths, civic occasions, national or local commemorations might be
dealt with.
3.2 There are a number of wider considerations for a Council flag flying policy:
 Prescription from the Sovereign including detailed events such as
recent death of Her Majesty the Queen.
 UK government policy.
 Scottish Government Policy.
 Other means, such as social media, for local authorities to show
support for causes.
3.3 As detailed in the Scottish Government advice “the matter of flag flying
remains one for individual local authorities to determine”.
Item 17.
Page 127

Page 128

3.4 The current Flag Flying Protocol has given rise to some tricky issues in its
implementation: 
 An increasing volume of requests for different flags for various causes
and occasions making it hard to choose which should be allowed.
 Who takes decision about which flags to display.
 The staff time involved in swapping out flags.
 The limited lifespan of flag fabric and costs of replacing worn flags.
 Which buildings are covered by the protocol. Many buildings are still
regarded as civic buildings but due to community asset transfers are no
longer under council control.
3.5 Since the previous protocol was agreed, and with the growth of social media
platforms there are new opportunities for local authorities to show support for
national and local causes.
3.6 There has also been an increase in the number of requests for Council
buildings to be illuminated in different colours for one off occasions. Similar
considerations apply as those for flag flying: which venues should be
considered, in what circumstances and with whose authority.
4. PROPOSALS
4.1 It is proposed that the committee approve the revised Flag flying Policy
attached as Appendix 1 to this report.
4.2 This new policy clarifies:
o Which civic buildings are covered by the policy
o Which flags should be flown on which flag poles
o That variations will only be allowed in exceptional circumstances.
o That variations are approved by the Chief Executive in consultation
with Leader and Civic Leader
o Who is responsible for changing flags, if a building is not Council
controlled
o The circumstances for when flags should be flown at half-mast
4.3 The new policy also deals with how requests for illumination of civic buildings
should be dealt with and provides that:
o Requests will only be considered for the fountain on the Plainstones,
Landshut bridge and Ladyhill monument, all in Elgin.
o Requests will actioned by Chief Executive in consultation with Leader
and Civic Leader and costs recovered where appropriate.
5. SUMMARY OF IMPLICATIONS
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
No direct implications.
Page 128

Page 129

(b) Policy and Legal
This Flag Flying Policy is contained within the Council’s suite of Second
Tier Governance Documents which are currently under review.
(c) Financial implications
Flags have a limited lifespan and cost around £200 to replace. The
budget is held by the Chief Executive.
(d) Risk Implications
There are no risk implications associated with this report.
(e) Staffing Implications
It is generally Council facilities staff who manage the flags at Elgin HQ
Campus. The Council DLO have previously dealt with requests for
illumination of buildings.
(f) Property
There are no property implications associated with this report.
(g) Equalities/Socio Economic Impact
Flags can be used to promote awareness of groups with protected
characteristics.
(h) Climate Change and Biodiversity Impacts
There are no direct carbon emissions impacts as a result of the report.
(i) Consultations
The Council Leader, Civic Leader [Strategic Leadership Forum], Chief
Executive, Head of Governance, Strategy and Performance and
Communications and Media Officer have been consulted and all
comments incorporated into the report.
5. CONCLUSION
5.1 The Council is asked to approve the new Flag Flying Policy
Author of Report: Caroline O’Connor, Committee Services Officer
Background Papers:
Ref: SPMAN-2045703626-435
SPMAN-2045703626-433
Page 129

Page 130

Page 130

Page 131

APPENDIX 1
FLAG FLYING POLICY
(including building illumination)
Approved by Corporate committee on 05 November 2024
Owner Head of Governance, Strategy and
Performance
Suggested next
review
November 2029
Item 17.
Page 131

Page 132

2
Contents
Introduction ..............................................................................................................................3
Buildings and sites covered by this policy................................................................................3
Occasions when flags will be flown at half-mast......................................................................6
Flags and Flag Flying Rules.....................................................................................................7
Building
illumination… … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … …
… … 7
Page 132

Page 133

APPENDIX 1
Introduction
Nationally recognised flags are flown from civic buildings and civic sites both routinely and to mark certain certain occasions.
This policy sets out the Council’s agreed position for which flags should be flown, on which buildings and when. It takes account of
generally accepted etiquette, national/government policy, and local established practice.
Buildings and sites covered by this policy
Flagpoles exist on a number of key civic buildings and sites throughout Moray. Some of these civic buildings/are owned and
controlled by the Council whilst some are under the control of separate organisations. Whilst the choice of flag is a matter for
determination by these separate organisations, the Council invites them to follow this policy for uniformity across the Moray area.
The default flags which will be displayed at each of these buildings/sites are detailed in the following table, subject to the General
Notes below: 
Civic site Ownership
(Control)
flag
poles
Flags normally displayed Alternative flags
Council HQ Moray Council
(facilities staff)
3 1. (Eastmost): Union Flag
2. (Centre): Saltire
3. (Westmost): Moray Council flag
Moray Council Flag (West) can
be replaced with the following
flags on the following dates:
16 Feb: Care Day flag
Armed Forces Day (27 June),
D-day and Remembrance day:
Armed Forces Day flag
Page 133

Page 134

4
One day in September (to
coincide with local pride
event): Pride flag
03 Sept Merchant Navy Day:
Red ensign
09 September: Emergency
Services flag
Elgin Town Hall Moray Council
(request to Elgin
Town Hall
Committee)
2 1. (Southmost): Lord Lieutenant’s
Flag
2. (Northmost) no flag normally
flown
Not specified
Forres Tolbooth Forres Heritage
Trust
(request to
committee)
1 Not specified. Union flag or Saltire may be
displayed for half-mast
occasions
Grant Park
Forres
Council are
trustees in public
trust
(Local volunteers
change flags)
2 1. (Eastmost): Union Flag
2. (Westmost): Saltire 
Not specified
Forres Nelson
monument
Moray Council
ownership.
Local volunteers
change flags.
1 Not specified. Trafalgar day: Union Flag
(21 October)
St Andrews Day: Saltire
(30 November)
Union flag or Saltire may be
displayed for half-mast
occasions
Page 134

Page 135

5
Schools with
flagpoles
Individual school
management
1 The Moray or Banffshire flag (depending
on location)
School flag
War memorials
on sites owned
by the Council
Moray Council
ownership.
(Local volunteers
change flags). 
1 flag not normally flown Union flag displayed from
Armistice day until
remembrance Sunday.
Buckie Town
house
Moray Council
Checking who, if
anyone, changes
flags
1 flag not normally flown Union flag or Saltire may be
displayed for half-mast
occasions
Station park,
Lossiemouth
Moray Council
ownership.
(Local volunteers
change flags). 
1 flag not normally flown Union flag or Saltire may be
displayed for half-mast
occasions
Keith
Reidhaven
Square
Moray Council
ownership.
(Local volunteers
change flags). 
1 Banffshire flag or Coummunity Council
flag
Union flag or Saltire may be
displayed for half-mast
occasions
General notes:
 No other flags will be displayed at Council controlled locations unless in exceptional circumstances and following either:
o An instruction or approval from the Chief Executive, after consulting the Council Leader, Civic Leader and, if
appropriate, the Lord Lieutenant.
o A committee decision
 Twin town exchange visits – the flag of the visiting town may be flown on appropriate sites during the period of the visit by
the overseas visitors in that community.
Page 135

Page 136

APPENDIX 1
Occasions when flags will be flown at half-mast
It is customary, as a mark of respect, for flags to be lowered on certain occasions.
This will apply to all flags displayed according to the previous table and the Council
will generally follow commands from the Sovereign and guidance from both UK
government and Scottish Governments.
Particular occasions when flags displayed from buildings/sites covered by this policy
will be flown at half-mast are:
 From the announcement of the death until the funeral of the Sovereign,
except on Proclamation Day when flags are flown at full mast from 11am to
sunset, unless otherwise advised.
 On the day of announcement of the death and on the day of the funeral of:-
- Members of the Royal Family
- Prime Minister of UK or past holders of that Office
- First Minister of Scotland or past holders of that Office
- Presiding Officer of Scottish Parliament or past holders of that Office
 On the day of announcement of death and on the day of the funeral of the
Council Leader or Civic Leader of Moray Council (day of announcement of death
and on the day of the funeral)
 On the day of the funeral following the death of:
- A councillor
- A former Civic Leader, Convener or Council Leader
- A Freeman
- The Chief Executive
- A Lord Lieutenant or former Lord Lieutenant of Moray or Banffshire
 On the day of announcement of death and on the day of the funeral of uniformed
services or armed forces personnel who were residents of Moray killed on active
service.
 In the event of an act of terrorism within the United Kingdom, involving multiple
fatalities.
 In the event of any other disaster, which has occurred within the United
Kingdom, involving multiple fatalities.  In such case the Chief Executive in
consultation with the Leader/Civic Leader of the Council, will make the decision
as to what is appropriate.
Page 136

Page 137

7
Flags and Flag Flying Rules
Saltire: The flag of St Andrew and the recognised National Flag of Scotland.  It is
correct to fly with or instead of the Union Flag. 
Union Flag: The official flag of the United Kingdom and should be used on all
occasions associated with the the broader white diagonals uppermost, top left hand
side of the flag nearest flagpole.
Half-Mast Position: The flag should be flown in a position two thirds of the way up
the flagpole and not halfway as the name suggests.
Where no flag is normally flown then the flag should be fully hoisted then, after a
pause for a few seconds, lowered to the correct position. Before lowering, the flag
should again be returned to the fully hoisted position.
For locations with only one flag pole
• The Union Flag will be flown at half-mast for Sovereign and UK wide
occasions.
• The Saltire will be flown at half-mast for Scottish, devolved or local occasions
.
For locations with 2 or more flag poles all flags both the Union Flag and the Saltire
will be flown at half-mast.
Illumination of buildings
The Council will occasionally be asked to change the colour of lighting for
buildings/structures which are illuminated at night.
The locations for which this request will be considered are:
Building Default lighting Event/period/colour
Fountain, Plainstones
Elgin
White Led Remembrance day- Red
Landshut bridge Elgin White Led Not specified
Ladyhill monument White Not specified
The Chief Executive may determine requests in consultation with the Leader/Civic
Leader of the Council. Any consent may be granted subject to cost recovery.
Page 137

Page 138

Page 138

Page 139

REPORT TO: CORPORATE COMMTTEE 5 NOVEMBER 2024
SUBJECT: MORAY GAELIC LANGUAGE PLAN (SECOND EDITION) 2025-
2030
BY                     DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT)
1. REASON FOR REPORT
1.1 To seek approval to submit the Moray Gaelic Language Plan (second edition)
2025-2030 to Bòrd Na Gàidhlig for their endorsement.
1.2 This report is submitted to Committee in terms of Section III (B) (41) of the
Council's Scheme of Administration relating to the formulation and review of
Council wide policy, strategies, priorities and objectives.
2. RECOMMENDATION
2.1 It is recommended that the Committee consider and approve the Moray
Council Gaelic Plan 2022-27 (second edition) prior to formal submission
to Bòrd Na Gàidhlig for their endorsement.
3. BACKGROUND
3.1 Under the Gaelic Language (Scotland) Act 2005 it is a requirement of a public
body to prepare a Gaelic Language plan. In addition to this statutory
requirement, the Education (Scotland) Act 2016 places several statutory
duties in relation to the promotion of the Gaelic language, and in the initial and
full assessment of need for Gaelic Medium Primary Education in response to
parents who make a request for Gaelic Medium Education.
3.2 The second edition plan was approved by Corporate Committee on the 8
November 2022 (para 9 of the minute refers) and subsequently submitted to
Bòrd Na Gàidhlig that month. Feedback and further discussions with their
Gaelic Plans Officer and meetings with Bòrd members led to requests to
strengthen commitments particularly on the corporate aims with two further
submissions. In particular, the Council was asked to strengthen aspects
relating to Gaelic in Education and to set specific measurable and time limited
actions. All requests have now been incorporated in the revised proposed
edition and the Committee is asked to consider this and agree the plan for
submission (Appendix1).
Item 18.
Page 139

Page 140

3.3 A quarterly reporting system will be set up for respective Heads of Service to
report back on the actions that are relevant to them. This information will be
reviewed on a six-monthly basis by the Extended Corporate Management
Team to ensure progress is made in delivering the Plan.
4. SUMMARY OF IMPLICATIONS
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The development and promotion of the Gaelic Language is not a specific
priority within the Corporate Plan and Local Outcome Improvement Plan;
however it aligns with the corporate and partner vision of:
o Our young people grow up safe, well-educated and reach
their full potential.
o Our businesses and communities prosper.
Working in partnership with organisations and the Gaelic community, this
edition of the plan will enable Gaelic speakers and learners to access
opportunities; inform residents of the Gaelic heritage and environment
and enable further initiatives to support Moray economically.
(b) Policy and Legal
The Gaelic Language (Scotland) Act 2005 requires relevant public
authorities to prepare a Gaelic Language Plan on receipt of a formal
notice from Bòrd Na Gàidhlig. The Moray Council have already accepted
this legal requirement with the production of the first edition of the Plan
(2017-22)
If the Council does not progress timeously and adequately the aims set
out by Bòrd Na Gàidhlig, then there is a strong likelihood that the Bord
will initiate a statutory process for non-compliance with Scottish
Government as the council is well beyond the normal 5-year renewal
date for the GLP. There has been considerable dialogue with the Bòrd in
developing the edition before committee.
The Education (Scotland) Act 2016 places several duties on local
authorities in relation to the promotion of the Gaelic language and in the
initial and full assessment of need for Gaelic early years provision and
Gaelic education, learner, and Gaelic Medium Primary Education.
The new HM Inspectorate carry out inspections of schools but have also
introduced themed inspections and it is not unreasonable to anticipate a
potential focus on how we meet the statutory regulations for Gaelic. Bòrd
Na Gàidhlig has recognised the growing levels of Gaelic learning and
usage in Moray, alongside the indisputable Gaelic heritage through
placenames etc. They have also been sympathetic to Doric recognising
its predominance in Moray and integrating cultural awareness of both in
Primary Schools.
Advice from Bòrd Na Gàidhlig is that the Gaelic Language (Scotland) Act
2005 will continue alongside the proposed Scotland’s Languages Bill
rather than being replaced by it.
Page 140

Page 141

(c) Financial implications
There is currently no dedicated Gaelic budget, and the new edition of the
Plan is based within existing budgets and accessing external grants. The
monitoring of the new edition will see stronger reporting back to
Extended CMT and that group has identified that if sufficient progress is
not being made then consideration of a Corporate Budget allocation
could be a future budget pressure.
Bòrd Na Gàidhlig offers an annual Gaelic Plans Fund and Education has
a separate fund that we can apply to. Both funds consider up to 80% of
costs with the remainder being met by the local authority in-kind or
through external means. There are also Third Sector Gaelic groups who
offer funding and services towards cultural opportunities that were
successfully accessed this year via CLD.
(d) Risk Implications
Failure to produce a current edition breaches the statutory requirements.
The only local authorities who do not currently have a plan are Orkney
and Shetland based on the fact that Gaelic has not historically been in
evidence there. All public authorities are in the process of producing or
updating editions of plans and the council would be failing to meet our
statutory duty which will lead to further external scrutiny.
(e) Staffing Implications
There are targets for services incorporated in the plan, so staff are aware
of their duties to respond to Gaelic need and promote opportunities. This
should be covered in staff induction and on-line training which will be
available. Delivering on plan requirements should be done within existing
remits but may impact on other priority work areas.
Recruiting staff who have Gaelic will be beneficial to services.
(f) Property
Future buildings should have a consideration to integrate Gaelic bi-
lingual signage.
(g) Equalities/Socio Economic Impact
An integrated impact assessment has been completed.
(h) Climate Change and Biodiversity Impacts
The plan will be available on-line, unless requested otherwise, thus
minimising resource impact. There are no climate change of biodiversity
issues arising directly from the report.
(i) Consultations
Consultations have been carried out with the Head of HR, ICT and
Organisational Development, Head of Education (Chief Education
Officer), Acting Head of Economic Growth and Development, 
Chief Financial Officer, Head of Governance, Strategy and Performance
and the Democratic Services Manager.
Page 141

Page 142

5. CONCLUSION
5.1 In order to meet the statutory regulations, members are asked to
approve the Moray Gaelic Plan 2022-27 (edition 2) draft document prior
to the submission of this draft document to Bòrd Na Gàidhlig.
Author of Report: Karen J. Delaney
Background Papers: Corporate Committee 8 Nov 2022
Ref: SPMAN-9425411-450 / SPMAN-9425411-452
Page 142

Page 143

1             
Moray Council Draft Gaelic Plan 2025-2030 
Front cover: 
Add Moray Council Logo and Bòrd na Gàidhlig logo once approved. 
Moray Council
Gaelic Language Plan
2025-2030 
Following consultation:
This plan has been prepared under Section 3 of the Gaelic Language (Scotland) Act 2005 and was
approved by Bòrd na Gàidhlig on approved date. 
1. Foreword: Interim Chief Executive John W. Mundell OBE 
As Interim Chief Executive of Moray Council I am privileged to support Moray Council’s Gaelic Language Plan
2025-2030.  It describes the ambitions of the Council and how we will meet the statutory requirement for Gaelic
enshrined in the Gaelic Language (Scotland) Act 2005 and National Gaelic Plan, as well as the statutory duties
around Gaelic Medium Education arising from the Education (Scotland) Act 2016. 
We recognise the benefits of multilingualism to our residents and the value of raising cultural and historical identity
and awareness.  Whilst the number of fluent speakers in Moray is low, it has grown significantly from 2011-2022.
Over Covid we saw staff and residents’ access on-line platforms to learn Gaelic and the new resource “Speak
Gaelic” will add impetus to this.  We have also seen a growing response to events held during Seachdainn na
Gàidhlig. As a small authority we are grateful to funding streams accessed via Bòrd na Gàidhlig and Scottish
Government to enable this successful provision. The success of this plan will be driven by the Gaelic speakers who
come forward to play their part with the plan and senior management and elected members driving forward
opportunities to make connections with Gaelic. 
I look forward to seeing the progress made.
Signed:                                                                                        
Photo of CEO
Item 18.
Page 143

Page 144

2
2. Contents 
Background
Moray’s Corporate Plan 2024
Review of the previous edition of the Moray Gaelic Plan
Gaelic in Moray
New Research
Moray Council Staff Skills Audit 31/1/22
Planning Context
Education
Learning Estate Infrastructure
Library & Heritage Service
Community Learning & Development
HR & Organisational Development
Environmental & Commercial Services
Appendices
Workplan Targets   
3. Background 
The Gaelic Language (Scotland) Act 2005 was passed by the Scottish Parliament with a view to securing the status
of the Gaelic language as an official language of Scotland commanding equal respect to the English language.
https://www.gov.scot/publications/gaelic-language-plan/pages/3/ 
One of the key features of the 2005 Act is the provision enabling Bòrd na Gàidhlig to require public bodies to
prepare Gaelic Language Plans. The requirement for a public body to prepare a Gaelic Language Plan is initiated by
Bòrd Na Gàidhlig issuing a formal notice to that effect under section 3 of the 2005 Act. It is intended that all public
bodies prepare their Gaelic Language Plan with a view to developing Gaelic in “a reasonable and proportionate
manner “taking account of the existing number of speakers within their area of operation, and their potential to
develop the use of the language. In addition to the above statutory requirement, the Education (Scotland) Act 2016
places several statutory duties on local authorities in relation to the promotion of the Gaelic language, and in the
initial and full assessment of need for Gaelic Medium Primary Education in response to parents who make a request
for Gaelic Medium Education. 
Moray Council’s first edition Gaelic Language Plan was produced in response to a statutory notice issued to Moray
Council by the Bòrd and went to Policy and Resources Committee for approval on 21 March 2017. At the time of
this initial statutory notice, the Bòrd identified 4 core areas of service delivery that it expected local authorities to
address when preparing Gaelic Language Plans: Identity, Communications, Publications and Staffing. Officers
produced a plan on this basis. 
The fourth National Gaelic Language plan 2024-2029 identifies overarching priorities linked to the vision of “A
measurable increase in the numbers of people speaking, learning using and Supporting Gaelic.”
https://www.gaidhlig.scot/wp-
content/uploads/2023/12/FINAL_BnG_National_Gaelic_Language_Plan_ENGLISH.pdf 
This will be achieved through the following priorities: 
a) Increasing the use and learning of Gaelic 
b) Community Priority Areas (to include on-line Gaelic Community networks; resource Gaelic Development
Officers and increasing the use and learning of Gaelic in Homes)
c) Increasing the use and learning of Gaelic in the Creative Industries
d) Increasing the use and learning of Gaelic in Business and the Economy
e) Increasing the use and learning of Gaelic in Public Authorities (this includes Gaelic visibility and signage)
Page 144

Page 145

3
f) Increase the use and learning of Gaelic in Education, 0-18 years
g) Increase the use and learning of Gaelic Post-school and Adult Learning.
Our Moray plan focuses on the high-level aims agreed by Bòrd na Gàidhlig and continuing the commitment of the
Corporate Service aims to grow all aspects of provision. We welcome the ambition of the National Gaelic Plan
and Moray will continue with the development of the previous editions’ priorities. 
4. Moray’s Corporate Plan 2024 
Our Vision: 
“A Moray where people prosper, free from poverty and inequality.”
• Our young people grow up safe, well-educated and reach their full potential 
• People lead healthy lives and have access to quality care when they need it 
• Our businesses and communities prosper 
• Our natural environment thrives for the betterment of all                
Intrinsic to this is a set of values: 
FAIR  Ambitious Improving Responsive
• Tackle inequalities
• Treat people fairly
• Promote equalities
and awareness
• Consider our impact
on others
• Be outward looking
• Promote and
celebrate Moray
• Be a great place to
work
• Ensure sustainable
and efficient
council services
• Drive improvement
• Encourage
innovation
• Take commercial
opportunities
• Invest in
transforming to
meet future needs
• Be open and
transparent
• Promote community
participation and
involvement
• Listen to and
involve our
communities 
Moray is a largely rural area covering a land mass of 2,238km2. It has a long coastline on the Moray Firth with
harbours, fishing villages and some world-class beaches. The area’s population is 94,280 (mid-year estimates
2022), rising from 93,470 (Mid-year estimates 2011) in 2011. The main centre of population is Elgin, which is
home to more than one quarter of the people living here. Other main towns are Forres, Buckie, Lossiemouth and
Keith, which each have populations of between 5,000 and 10,000.  The Council workforce is around 4,700 - -
equivalent to 3,500 full time staff. (Source: Public Performance Report) 
This information is the backdrop to the second edition of the Moray Gaelic Language Plan. 
5. Review of the first edition of the Moray Gaelic Language Plan 
In November 2021 a Corporate Gaelic Group was created and terms of reference agreed. In 2024 it was chaired by
the Head of Education, Resources and Communities, with representation from HR, Internal audit, Finance,
Housing, Environmental Services, Education, Libraries and our Communities CLD team. The group meets 4 times
annually and produced a draft second edition of the Plan which was approved by Moray Council and submitted to
the Bòrd in November 2022 and subsequently in March and September 2024. Following feedback discussions, the
focus of this Plan was agreed.  
Page 145

Page 146

4
Governance: The internal communication process: 
Corporate 
Committee
Corporate
Management
Team
Corporate Gaelic Group
Council Staff & Communities
The Corporate Gaelic Group engages with all Moray Council Gaelic related issues, responding to national
developments and local needs whilst monitoring, reviewing, and reporting annually on the second edition of the
Gaelic Language Plan. Council staff and communities will be informed through bi-lingual updates on social media
and the Councils staff interchange. The Corporate Gaelic group will monitor the plan which will be reported on
internally annually and then submitted to Bòrd na Gàidhlig.  The Interim Chief Executive has overall responsibility
to ensure that the Moray Council delivers on the Gaelic Language Plan.
Achievements: 
• Creation of the Corporate Gaelic Group
• Completion of the staff skills audit with 259 respondents
• Successful funding bid to Gaelic Covid monies for “Gaelic First Steps,” however this funding had to be returned
when a tutor could not be secured. This indicates one of the continuing challenges for delivery  The translation
of the new CLD plan easy read…a first in Scotland 
• Successful funding bid to the Gaelic Specific Grant for “Carson Gaidhlig?” through partnership work with
Moray College UHI and Moray Gaelic Group.  The bid was to bolster conversation activity and support to
develop the new plan.  Through this seed corn funding a public meeting was held to assess the needs and interest
in Gaelic and to relaunch Moray Gaelic Group classes
• Moray held week-long activities via Seachdain na Gàidhlig, World Gaelic Week, with a subsequent report and
interview on Keith Community Radio involving participants. This was funded via the Gaelic Specific Grant. A
Gaelic stall was set up at Moray College to promote opportunities
• Developed contact with the Gaelic Books Council and through external Scottish Government funding a range of
Gaelic books were purchased to be rotated round the public libraries
• The North Alliance CLD network held a Gaelic themed focus meeting led by Education Scotland Gaelic
Officers
• A newsletter was produced on the work of the Communities CLD Team which included Gaelic provision 
• There is a strong partnership with Moray Gaelic Group and Moray College UHI to develop initiatives and new
relationships are being created with new Gaelic Plan partners.                 
Page 146

Page 147

5 
6. Our second edition Gaelic Language Plan will build on the progress made with Gaelic initiatives recognising the
challenging environment of local government. Our targets, timelines and responsibilities are summarised in an
action plan at the end of the document. 
Corporate Strategic Group:    
Target 1: As a strategic group, we will continue to monitor outcomes and grasp opportunities
to promote Gaelic. 
Target 2: We will develop and maintain a Gaelic information and opportunities page on the
Councils website. 
Target 3: We will share social media posts from Moray Gaelic Partners via the Council’s
official accounts and ensure social media messaging regarding Gaelic initiatives are issued
bilingually. 
Target 4: We will audit the Councils core processes and identify where Gaelic can be
introduced into public documents.
Target 5: We will focus on this edition 2 of the Plan to develop the corporate service aims
provided by the Bòrd thus growing all aspect of provision. (see appendix D)
7. Gaelic in Moray 
• Moray Map, Bòrd na Gàidhlig https://www.ainmean-aite.scot/wp-content/uploads/2021/11/Moireibh-300-
dpi-scaled.jpeg (to be used as a slide/picture)
• Moray is an area where Scots and Doric are spoken.  Gaelic skills are developing as highlighted in the
comparison of the 2011 and 2022 census data: 
Moray Gaelic Language Skills 2011 and 2022 
All people aged 3 and over  90,178 90,787
Understands but does not speak, read or write Gaelic       354       828
Speaks, reads and writes Gaelic       311                  454
Speaks but does not read or write Gaelic       246                  273
Speaks and reads but does not write Gaelic         66                    96
Reads but does not speak or write Gaelic         84                  153
Other combination of skills in Gaelic         20                     52
No skills in Gaelic 89,097             88,936 
https://www.scotlandscensus.gov.uk/ 
8. New Research: 
Over the past 2 years we have also seen a significant increase in participation and the volume of activities offered
through World Gaelic Week.  This is consistent with the ScotCen Social research dated 29/06/2022 reports: 
Page 147

Page 148

6
“There has been a shift towards more positive attitudes regarding the language in a range of areas, including
views on Gaelic education, the importance of Gaelic to one’s own cultural heritage, public spending on
Gaelic, and the future of Gaelic.”
www.gaidhlig.scot/en/our-work/research/reports-and-papers/ 
(The 2021 research sample was based on 1,365 randomly selected people interviewed aged 18+. The data was
weighted to be representative of Scotland in terms of age, sex, region, and other socio-economic characteristics.) 
9. Moray Council Staff Skills Audit 31/1/2022 
In preparation of our second edition Moray Gaelic Language Plan an audit was carried out with 259 returns: 
• 27 staff had some Gaelic or were learning and 231 had none
• 76 were interested in Gaelic language classes
• 55 were interested in informal conversation sessions 
• 18 were interested in Gaelic social activities 
• 52 were interested in further Gaelic discussions 
Since this piece of work employees are notified of any initiatives to progress their interest and involvement through
the staff interchange, direct emails and social media.          
From anecdotal Moray feedback, there was an increased take up of on-line learning opportunities during Covid
using e.g. Duolingo. We wish to encourage the learning and use of Gaelic within the Councils staff.
For Council Staff:
Target 6: We will pilot online Gaelic introduction sessions with a partner local authority and evaluate and share
findings
Target 7: We will pilot monthly Strupag conversation sessions for staff and the wider community
Target 8: We will encourage Council staff who are Gaelic learners or speakers to use the following on their
email signature: 
The number of staff using the logo will be reported annually by departments and this will be used as a benchmark
for future monitoring.
Target 9: We will bring together Gaelic speakers with different levels of fluency annually to encourage
opportunities to stimulate Gaelic use and ascertain interest in a Gaelic forum.
Target 10: We will monitor any Gaelic requests via the updated equalities form, reporting annually to Bòrd na
Gàidhlig. 
For our Councillors:
Target 11: We will deliver an annual Gaelic conversation for all councillors and senior management to inform
them of the statutory duty and any updates to edition 2 of the Moray Gaelic Plan. 
Page 148

Page 149

7
Target 12: We will report internally annually on the progress of edition 2 of the Moray Gaelic Plan and submit
reports to Bòrd na Gàidhlig. 
Target 13: We will create a Gaelic elected member lead for the duration of edition 2 of the Gaelic Plan who will
liaise with the public, Council Officers and CLD Officer. 
10. Planning Context: 
There are some 57 approved Gaelic Language plans in Scotland within existing public authorities.  The content is
honed to the functions and context of the organisation. The content does impact on Moray and the future should see
a building of increased partnership work and opportunities to enhance provision as new plans are generated. Please
see appendix B. 
Target 14: We will bring together plan owners annually for a Moray focussed sharing session to seek
opportunities, learn from each other and jointly plan. 
11. Education 
Since 2022 there has been one request for Gaelic Medium Education in Primary and one request for Gaelic Medium
input in Speyside. Curricular support has been arranged via e Sgoil access. 
Gaelic themed learning sessions has been introduced in some Primary Schools via an externally funded film project.
The Bòrd have recognised that there has been progress made in relation to engaging with Primary Schools and are
supportive of the approach being developed. 
There is a curriculum offer to pupils through e Sgoil which has been sent to our eight secondary schools as well as a
video clip of an ex-pupil from Forres Academy who learned and sat National 5 and Higher Gaelic. There is a teacher
Continuing Professional Learning offer through the Northern Alliance, our regional collaborative, and other Gaelic
agencies which are made available to schools. This is enhanced by advertising attendance at the Moray Gaelic
Group for interested teachers and members of the public. One supply teacher who is retired has come forward from
the eight identified by the GTCS as Moray teachers who wished to learn Gaelic. A headteacher has been on a Gaelic
language professional learning course in July 2023 and has used her learning to run a project in her primary school
in February 2023 and February 2024. 
Contact has been made with Skills Development Scotland regarding employment opportunities in Gaelic and
sessions have been arranged for pupil support staff in secondary schools with SDS and Education Scotland. Contact
was also made with the Quality Improvement Officer overseeing Gaelic Education in Aberdeenshire, and it is hoped
to develop this link with this officer and the Highland Gaelic Education Officer. The best way forward in Moray is
to have Scottish language, history and culture themed projects advertised to, and delivered in, interested primary
and secondary schools so that Gaelic can be offered with Scots. 
Target 15: We will offer certificate courses in Gaelic Education in the Senior Phase S4-S6 and develop this by
offering Scottish languages, history and culture projects across Secondary Schools in S1 to S3 as capacity allows
to create an interest in offering Gaelic as an L3 option.
Target 16: We will issue a Moray survey to parents/carers, teachers, pupil support assistants, library assistants and
sports staff to ascertain interest in Gaelic early years provision and Gaelic education (learner and Gaelic-medium)
delivery and act on the findings.
Target 17: We will promote Moray and Northern Alliance Modern Languages Progressions which include Gaelic
progressions and add case-studies to this webpage. 
Page 149

Page 150

8
Target 18: We will offer professional learning in Gaelic language teaching to build capacity within Moray
Education and encourage staff to apply for grants to fund these opportunities 
Target 19: We will update our Moray Council education website to make information on Gaelic Education more
accessible to Moray parents/carers. 
Target 20: We will liaise with other Local Authorities and organisations to see where we can be supported in
offering and delivering Gaelic Education to increase provision. 
12. Education Infrastructure: 
The Learning Estate Team is responsible for enhancing and developing our learning estate (early year’s settings and
schools) in line with available budgets. 
Within the current Learning Estate plan, we have new build/major refurbishments anticipated for Forres Academy
and Buckie High School towards the end of the decade. In addition, we are completing survey works across the
whole of the current Learning Estate (a further 49 schools), which will identify and prioritise a refurbishment
programme into the next decade. 
The team will address how Gaelic can be incorporated into signage when developing new schools, or refurbishing
existing schools, in consultation with the school and wider community. The historical and cultural significance of
names will be shared so informed choices can be made. 
Target 21: We will address how Gaelic signage can be incorporated into new and refurbished schools to meet the
needs of local communities as they progress. 
13. Library & Heritage Service 
The Library Service (currently 11 libraries and 1 mobile library) has a permanent stock of Gaelic literature,
reference and learning materials. We work with the Scottish Book Trust to ensure that age appropriate resources are
available to those who need them and we can provide free Gaelic language support to groups, health visitors, early
years settings etc. as appropriate. 
Target 22: We will rotate our Gaelic resources around our larger libraries every 6 months. We will publicise the
collection as and when in each new location and refresh and renew based on demand as appropriate. 
Target 23: We will develop and promote Gaelic activity as part of the annual library services programme for
Book Week Scotland (November).  We will feature at least one Gaelic event as part of the programme each year.
We will produce publicity and promotional material bi-lingually. 
The Heritage Centre has statistical accounts but no other Gaelic reference books. A carved lintel stone has been found
with “Biodh fiala ri choicrich,” roughly translated, “Be generous to strangers” above a doorway in Burghead. 
There is also a second French and Gaelic inscription that is being researched. It is over 200 years old and not listed on
the Canmore site, (which is an online catalogue of Scotland’s archaeology, buildings, industrial and maritime
heritage.) https://canmore.org.uk/ 
Target 24: We will develop awareness to actively collect images of Morays Gaelic Heritage to build a data-base and
share with Canmore. 
Page 150

Page 151

9
14. Community Learning & Development   
Our Partnership CLD Plan 2024-2027 was published in August 2024 with the priorities of: 
• Learning for Life
• Active Citizens and Community Voice
• Developing and Connecting the CLD Workforce Development 
Within this there are cross cutting themes of: 
• Addressing the impacts of rurality and poverty
• Improving mental health and wellbeing by reducing isolation
• Promoting climate justice. 
The Scottish Government Review of CLD findings will also influence future delivery and direction of service
provision. (Learning for All. For Life July 2024) 
Target 25: We will continue to service the Corporate Gaelic Group, apply for external funds, report on activity and
manage funding. 
Target 26: We will build on the “Exploring Gaelic” sessions to staff and community groups and support an annual
speaker’s programme with Libraries to highlight Gaelic interest and culture. 
Target 27: We will service and support a monthly Strupag group to enhance opportunities to use the language and
encourage new learners and staff to the Gaelic community. 
Target 28: We will seek opportunities to use the “Gaelic Placenames of Moray” publication to maximise its reach
Target 29:  We will develop a programme to promote World Gaelic Week building on the voices of Gaelic
speakers and learners. 
Target 30: We will promote Gaelic learning and cultural opportunities to the CLD workforce 
Target 31: We will seek corporate and external funding to secure a Gaelic speaking CLD worker based on
identified need.
15. HR & Organisational Development
Where Gaelic Language is an essential criteria for a post the Person Specification will specify this, and the post will
be advertised in Gaelic.
Where it is deemed desirable for a post to have Gaelic language then the post should be advertised in Gaelic and
English.
To show our commitment it is proposed that the Vacancy Management form is amended to include the following:
1. Is Gaelic Language an essential criteria for this post?
2. Is Gaelic language a desirable criteria for this post? 
Employee Development: Learning Gaelic
Moray Council staff will be encouraged to learn Gaelic where it would add value to their role using flexi time,
lunchtimes, and late starts (where practicable) to do so.
Page 151

Page 152

10
Target 32: We will amend the Vacancy monitoring form to ensure recruiting officers consider Gaelic language
criteria 
Target 33: We will support and enable opportunities to learn Gaelic including staff and elected member induction
processes 
Page 152

Page 153

11
16. Environmental & Commercial Services
Where new or replacement signage is required, the service will work with the relevant communities to establish the
best options for the signage, including the potential for bi-lingual signage. 
Target 34: We will introduce internal multi-lingual Welcome signage in our public buildings from August 2025
Target 35: We will Introduce external Gaelic signage as opportunities arise in buildings, streets and roads
Target 36: Moray Growth Deal Cultural Quarter project will follow Moray Council corporate policy regarding the
adoption of signage relating to the construction of new facilities
Target 37: Partnership working will be strengthened between the project and key agencies such as Visit Scotland,
Creative Scotland and Historic Environment Scotland (Project Board members) to drive learning and identify
opportunities for synergy in how parties managing facilities in the Cooper Park area promote
Gaelic
Target 38: With the cultural offering associated with the Grant Lodge facility due to be developed, the project
team will evaluate and evidence options for the integration of Gaelic. 
17. Appendices 
a) Key Gaelic national partners: 
Bòrd na Gàidhlig  Works to promote Gaelic throughout Scotland. Find information on the benefits of
Gaelic education, being bilingual and your nearest Gaelic provider. 
Fèisean nan Gàidheal The organisation which supports the development of community-based Gaelic arts
tuition festivals 
Comunn na Gàidhlig An organisation which seeks to promote Scottish Gaelic language and culture 
Comann nam Pàrant  A Gaelic parents organisation which supports a network of local groups
Comhairle nan
Leabhraichean 
The Gaelic Books Council is the lead organisation with responsibility for supporting
Scottish Gaelic authors and publishers 
An Comunn
Gàidhealach 
An Comunn Gàidhealach has supported the teaching, learning and use of the Gaelic
language and the study and cultivation of Gaelic literature, history, music, and art for
over 100 years. Through the organisation and running of the Royal National Mòd and a
network of provincial Mòds across Scotland, An Comunn Gaidhealach furthers the
aims of supporting and developing all aspects of the Gaelic language, culture, history,
and heritage at local, national, and international levels.
Ainmean-Àite na h-
Alba
A free database that provides a single source of authoritative information on Gaelic
forms of place-names. 
Page 153

Page 154

12
b) Gaelic Language Plans that impact on Moray:   
Creative Scotland Historic
Environment
Scotland
Crofting
Commission
Scottish Land &
Forestry
Scottish
Funding
Council
Skills
Development
Scotland
Education
Scotland
National
Galleries of
Scotland
Highland and
Islands
Enterprise
Nature Scot University of
the Highlands
and Islands
Police Scotland
Sport Scotland Cairngorm
National Park
Authority
Scottish
Qualifications
Authority
Scottish
Parliament
Visit Scotland Historic
Environment
Scotland  
c) High-level aims 
d) Amasan Àrd-Ìre High-level Aims
Airson an cur a-steach do dh’eagran 02 de Phlana
Gàidhlig Comhairle Mhoireibh
For inclusion in edition 02 of Moray Council’s Gaelic
Language Plan
A’ cleachdadh na Gàidhlig Using Gaelic
Stèidhich CM Buidheann Plana Gàidhlig maireannach
le riochdachadh bhon a h-uile roinn agus aig a bheil
dleastanas airson leasachadh, lìbhrigeadh agus sgrùdadh
plana Gàidhlig na Comhairle. 
Lorgaidh CM cothroman gus ar tuigse a leasachadh air
luach cultarail agus dùthchasach na Gàidhlig thar nan
seirbheisean eadar-dhealaichte againn. 
Far an tig cothroman am bàrr, beachdaichidh CM air
mar a dh’fhaodadh a’ Ghàidhlig cur ri leasachadh agus
brosnachadh pròiseact a’ Chairteil Chultarail taobh
astaigh Cùmhnant Fàs Mhoireibh, ri linn fòcas a’
Chùmhnaint air Ùr-ghnàthachas à Traidisean. 
MC will establish a permanent Gaelic Plan Group with
representation from all departments and responsibility
for development, delivery and monitoring of the
Council’s Gaelic language plan. 
MC will seek opportunities to develop our
understanding of the cultural and heritage value of
Gaelic across our different services. 
Where opportunities arise MC will consider how
Gaelic can contribute to the development and
promotion of the Cultural Quarter project within the
Moray Growth Deal, in line with the Deal’s focus on
Innovation from Tradition.
Page 154

Page 155

13  
Ag ionnsachadh na Gàidhlig  Learning Gaelic
Thèid an dleastanas a th’ ann an Achd an Fhoghlaim
(Alba) 2016 a chur an sàs le CM gus foghlam tro
mheadhan na Gàidhlig agus foghlam Gàidhlig do luchd-
ionnsachaidh a bhrosnachadh do luchdcòmhnaidh sgìre
CM mar a thathar a’ meas iomchaidh, a’ gabhail asteach
a’ chothruim a th’ ann do phàrantan iarraidh gun tèid
foghlam tro mheadhan na Gàidhlig (FtG) a
stèidheachadh anns an sgìre. 
Bidh Comhairle Mhoireibh a’ tabhann cùrsaichean
teisteanais ann am Foghlam Gàidhlig aig an Ìre as Àirde
ÀS4-ÀS6 agus cuiridh iad seo an gnìomh mean air
mhean anns a h-uile Àrd-sgoil. 
Cruthaichidh Comhairle Mhoireibh plana gnìomh le
amasan aontaichte gus dèanamh cinnteach gu bheil a’
Ghàidhlig mar nuachànan (L3) ri faighinn thar
bunsgoiltean an ùghdarrais.
Bidh co-chomhairle ghnìomharrach aig CM còmhla ri
pàrantan agus inbhich cunntasach eile ann an sgìre na
Comhairle gus faighinn amach ma tha iarrtas ann airson
solarachadh tràth-bhliadhnaichean na Gàidhlig agus
foghlam Gàidhlig (luchd-ionnsachaidh agus tro
meadhan na Gàidhlig). Thèid na toraidhean àrd-ìre bhon
cho-chomhairle a cho-roinn le prìomh luchdùidh, a’
gabhail asteach Bòrd na Gàidhlig. 
Bheir CM taic do dh’inbhich a tha nan luchdlabhairt no
nan luchd-ionnsachaidh thar sgìre na Comhairle. 
MC will undertake the duty under the Education
(Scotland) Act 2016 to promote and support, as
appropriate, the potential for Gaelic medium and
Gaelic learner education to MC residents, including
the opportunity that exists under this Act for parents to
request the establishment of Gaelic Medium
Education (GME). 
The Moray Council will offer certificate courses in
Gaelic Education in the Senior Phase S4-S6 and
progressively implement this across all Secondary
Schools. 
The Moray Council will develop an action plan with
agreed targets to ensure that Gaelic as a modern
language (L3) is available across primary schools in
the authority. 
MC will actively consult with parents and other
responsible adults in the Council area to establish
whether there is demand for Gaelic early years
provision and Gaelic education (learner and
Gaelicmedium). The top-level findings from the
consultation will be shared with key stakeholders,
including Bòrd na Gàidhlig. 
MC will support adult Gaelic speakers and learners
across the Council area.
A’ cur na Gàidhlig air adhart Promoting Gaelic
Bheir CM taic do thachartasan a bhios a’ cur cudrom air
àite na Gàidhlig san latha an-diugh agus gu traidiseanta
ann an coimhearsnachd, ealain agus beatha cultarach na
sgìre. 
MC will support events which highlight the
presentday and traditional role of Gaelic in the area’s
community, arts and cultural life.   
Corporate Aims – stipulated by Bòrd na Gaidhlig for all public bodies in Scotland:
Àrd Phrionnsapalan Overarching Principles
Spèis Cho-ionann
A h-uile gealladh anns a’ Phlana Ghàidhlig air a
lìbhrigeadh dhan aon ìre anns a’ Ghàidhlig agus anns
a’ Bheurla.
Equal Respect
Gaelic language plan commitments delivered to an
equal standard in both Gaelic and English.
Page 155

Page 156

14
Cothroman Follaiseach
Gnìomhan practaigeach gus dèanamh cinnteach gu
bheil fios aig luchd-obrach na buidhne agus am
poball daonnan air na cothroman a th’ ann gus
Gàidhlig a chleachdadh leis an ùghdarras phoblach.
Active Offer
Practical measures to ensure that staff and public are
kept regularly informed of all opportunities that exist
to use Gaelic in relation to the work of the public
authority.
Treas Partaidhean
A’ dearbhadh gum bi ALEOs agus cunnradairean
eile ag obair gus plana Gàidhlig an ùghdarrais
phoblaich a chur an gnìomh.
Third Parties
Ensure that Arm’s Length Executive Organisations
and other contractors help with the delivery of the
public authority Gaelic language plan.
Gàidhlig na nì àbhaisteach
Geallaidhean bhon phlana Ghàidhlig air an gabhail a
- steach ann an structaran an ùghdarrais phoblaich tro
thìde, le sgrùdadh cunbhalach airson cothroman a
chomharrachadh taobh a-staigh bhuidseatan
stèidhichte gus Gàidhlig a thoirt air adhart.
Normalisation
Gaelic plan commitments are normalised within the
structures of the public authority over time, with
opportunities to grow Gaelic within existing budgets
constantly assessed.
Pàrantan Corporra
Gu bheilear mothachail air na dleastanasan a th’ ann
mar Pàrant Corporra gum bi a h-uile pàiste is neach
òg fo chùram no a b’ àbhaist a bhith fo chùram le
Gàidhlig a’ faighinn na h-aon cothroman ‘s a tha
clann le cànain eile.
Corporate Parenting
That the authority is aware of the duties of a
Corporate Parent to ensure that looked after children
and young people and care leavers with Gaelic
receive the same opportunities as those with other
languages.
Inbhe Status
Suaicheantas
Ag amas air suaicheantas corporra anns a’ Ghàidhlig
agus anns a’ Bheurla a chruthachadh nuair a thig a’
chiad chothrom agus mar phàirt den phròiseas
ùrachaidh.
Logo
Aim to render the corporate logo in both Gaelic and
English at the first opportunity and as part of any
renewal process. 
Notes: 
For further information contact: Gaelic@moray.gov.uk 
Page 156

Page 157

15
d) Workplan targets:
Action CORPORATE GAELIC
GROUP:
We will
Success Measure Target Timescale Lead
1 Monitor and show leadership
over the plan grasping
opportunities to promote
Gaelic.
Consistent Gaelic progress
and content within Council
operations.
6 monthly reviews in place
and recommendations
made.
4 meetings per year held with 80%
attendance levels across all services.
A quarterly reporting system will be set up
for respective Heads of Service to report
back on their actions. Information will be
reviewed on a 6 monthly basis by the
Extended Corporate Management Team.
Each year we will work with two different
services to focus on increasing Gaelic
visibility within their department.
2025-2030 Throughout the
second edition of the plan 
Depute CEO
2 Develop and maintain a
Gaelic information and
opportunities page on the
Councils website.
Increased awareness and
use of the Gaelic page 
Page refreshed 
Baseline data collected 
10% year on year increase in traffic to the
Gaelic web page.
March 2025 
Jan 2026 
2027-2030 Annually 
PR
Corporate Gaelic
Group
3 Promote and share social
media posts from Moray
Gaelic Partners via the
Council’s official accounts and
ensure social media messaging
regarding Gaelic initiatives are
issued bilingually. 
All Gaelic related social
media posts are issued
bilingually. 
8 posts per year minimum 
Increase the average reach of posts to
quantify audience engagement. 
2025 and throughout
the second edition of
the plan 
PR
Page 157

Page 158

16
4 Audit Service core processes
and identify where Gaelic can
be introduced into public
documents.
All departments use the
refreshed Equalities
Statement and consider key
documents for translation. 
Translations delivered within
existing budgets and
incorporated. 
Invite Gaelic speaking staff and other
stakeholders to act as a reference group to
identify priority documents for translation. 
Reference group to sense check 25% of
translations for accuracy. 
By December 2025 Depute CEO
5 Focus on in edition 2 to
develop the corporate service
aims provided by the Bòrd
thus growing all aspects of
provision (appendix D)
1. Where Gaelic services are
provided, they will
demonstrate equal
respect for Gaelic and
English.
2. To actively offer any
Gaelic services provided
3. To normalise Gaelic
provision over time
4. To render the corporate
logo bilingual when re-
branding
5. To include Gaelic in
reception and phone
services
6. To offer Gaelic at public
meetings and provide
Gaelic services where
there is a request
7. To undertake an internal
audit to build on Gaelic
capacity and training
needs for Gaelic language
and Gaelic awareness
1. Where Gaelic services are provided,
they will demonstrate equal respect for
Gaelic and English
2. Gaelic services will be actively offered
and provided
3. Staff will automatically consider Gaelic
needs in practice
4. The digital corporate logo will have
bilingual re-branding  
5. Gaelic will be available in reception and
phone services
6. Gaelic will be made available at public
meetings and Gaelic services provided
where there is a request
7. An internal audit report to build on
Gaelic capacity and training needs for
Gaelic language and Gaelic awareness
will be produced.
By January 2025
By June 2025
By June 2026
By August 2025
By January 2026
By January 2027
By July 2029
Corporate Gaelic
Group
Corporate Gaelic
Group
Managers
PR
Organisational
Development
Managers
CLDO/Employee
Development
Page 158

Page 159

17
within the life-span of
edition two.” 
COUNCIL STAFF: We will Success measure Target Timescale Lead
6 Pilot an online Gaelic
introduction sessions with a
partner local authority and
evaluate and share findings
20% of staff who take part in
sessions move on to further
learning opportunities. 
10 staff access the training opportunity March 2025 CLD Officer & Local
Authority partner
7 Promote a monthly Strupag
conversation session for staff
and the wider community
Participants link in with other
Moray classes.
Native speakers attend.
12 sessions delivered per year 2025 and though-out the
lifetime of the plan
CLD Officer
8 Encourage Council staff who
are Gaelic speakers or learners
to highlight their Gaelic skills
on their email signature
Managers encourage staff to
declare skills. 
Greater visibility of actual
Gaelic skills across Council. 
Council and public have a
better understanding of staff
who are confident to
communicate in Gaelic.
Baseline established on the number
of departments with staff using the
signature identified. 
Increase the number of departments with at
least one member of staff using the
signature 
March 2026 
June 2028 
CMT/SMT
Page 159

Page 160

18
9 Bring together Gaelic speakers
with different levels of fluency
annually to encourage
opportunities to stimulate
Gaelic use and ascertain
interest in a Gaelic forum. 
Needs identified for future
development. 
Staff interest in future
meetings acted on to build a
staff Gaelic community.
Annual staff on-line meeting delivered Year 2, 2026 and annually
thereafter
Organisational
Development
10 Monitor any Gaelic requests
via the updated equalities
form, reporting annually to
Bòrd na Gàidhlig.
To have a clear
understanding of the needs
requested.
100% of requests collated with
information copied to the generic
Gaelic inbox
Gaelic@moray.gov.uk and reported to the
Corporate Group 
From January 2026  Equalities Officer
CLDO
COUNCILLORS: We will Success measure Target Timescale Lead
11 Create a Gaelic elected
member lead for the duration
of edition 2 of the Gaelic Plan
who will liaise with the
public, Council
Officers and CLD Officer.
Councillor attends updates
with CLDO &
responds/signposts any
Gaelic correspondence.
Councillor raises any Gaelic
opportunities within role
Recruit elected member lead. 2025 CLDO
12 Deliver an annual Gaelic
conversation to inform
councillors of the statutory
duty and any updates to the
Moray Gaelic Plan.
Elected member lead hosts an
annual informal session prior
to formal reporting of
progress.
1 dedicated meeting delivered. Year 1 July 2025 and
annually thereafter
Depute Chief
Executive
Officer/CLDO/Gaelic
Specialist
13 Contribute to the Corporate
Group in providing annual
progress report on Plan.
Increased member
understanding of the
relevance of Gaelic in
Moray.
Annual committee report with elected
member lead input.
Years 1-5 annually in
August
Depute Chief
Executive
Officer/CLDO
Page 160

Page 161

19 
GAELIC PLAN HOLDERS:
will: Success measure Target Timescale Lead
14 Bring together plan owners for
a Moray focussed sharing
session to learn from each
other and jointly plan.
Increase in collaboration of
partners with council
departments/initiatives
One annual Gaelic Plan Holders meeting
held during Seachdain na Gàidhlig week
Annual event every year
2025-2030
CLDO
Page 161

Page 162

20 
MORAY EDUCATION: We
will Success measure Target Timescale Lead
15 Offer certificate courses in
Gaelic Education in the Senior
Phase S4-S6 and progressively
implement this across all
Secondary Schools in S1-3 as
capacity allows to create an
interest in offering Gaelic as an
L3 option
Gaelic is offered at L3 across
more of our primary schools
with 20% having an offer by
year 5. 
A foundation is established
to build on developing
Gaelic offering across
secondary schools 
Information is provided to
pupils and parents on Gaelic
in secondary to promote the
offer
Year 1: 3 ELCs and primary schools
offering Gaelic as an L3 (Dallas,
Newmill and Botriphnie) 
Year 2 and subsequent years:  3 additional
primary schools/ELC settings run Gaelic
projects each year in Scottish languages,
history and culture 
Year 2: One secondary school offers Gaelic
as an L3 option (e-Sgoil).
By the end of school
year 2024/25 
20% of primary schools
have had a Gaelic offer
by 2030 
By the end of school year
2025/26 
Education Lead
Officer and Primary
Headteachers 
Education Lead
Officer and Primary
Headteachers
Education Lead
Officer and Principal
Teacher(s) of Modern
Languages
16 Issue a Moray survey to
parents/carers, teachers, pupil
support assistants, library
assistants and sports staff to
ascertain interest in Gaelic
early years provision and
Gaelic education (learner and
Gaelic-medium) and act on the
findings
We know the interest in
Gaelic early years, Gaelic
medium and Gaelic learner
education 
Survey issued, returned and
analysed 
We will issue the survey by the end of
school year 2024/25 and share with
stakeholders including BnG
By the end of school year
2024/25 and then bi-
annually
Education Lead
Officer
17 Promote Gaelic and Northern
Alliance Modern Languages
Progressions which include
Gaelic progressions and add
case-studies to this webpage
Head teachers and school
staff are aware of as part of
the Modern Languages
progressions 
We will promote this via the Education
Briefing each term. 
A case study is added to the Gaelic
education webpage 
One secondary will offer Gaelic as L3
By end of school year
2024/25 
By the end of school year
2025/26
Education Lead
Officer
Page 162

Page 163

21
18 Offer professional learning in
Gaelic language teaching to
build capacity within Moray
Education and encourage staff
to apply for grants to fund
these opportunities
More Staff in ELC/primary
and secondary will be aware
of Gaelic PL opportunities
and participation will increase
each year. 
NQTs will know about the
provision of Gaelic education
in Moray n PLL Update
through the induction process
Advertise at least one Gaelic professional
learning (PL) opportunities to Moray
colleagues  per year 
1 member of staff from each ASG will have
attended 
1 member of staff from each
secondary will have attended 
1 member of staff from each primary will
have attended 
1 member of staff from each Council
ELC setting will have attended
2024/25 and each year
thereafter 
2025/26 and each year
thereafter 
2025/26 
2026/27 
2027/28
Education Lead
Officer and interested
staff
19 Update our Moray Council
Education web- page to make
information on Gaelic
Education more accessible to
Moray parents/carers
To make information about
Gaelic Education more
accessible to parents/carers
Moray Council Education webpage will be
updated and informed through stakeholder
feedback.
By January 2025 Education Lead
Officer
20 Liaise with other Local
Authorities and organisations
to see where we can be
supported in offering Gaelic
Education to meet needs 
Increased capacity available
by partnership work with
other local authorities and
organisations to offer
provision
Explore options with neighbouring local
authorities and organisations to meet
Gaelic needs
By March 2025 and
ongoing
Education Lead
Officer
Page 163

Page 164

22 
INFRASTRUCTURE: We will Success measure Target Timescale Lead
21 Address how Gaelic signage
can be incorporated into new
and refurbished schools to meet
the needs of local communities
as they progress. 
New or refurbished buildings
will have Gaelic signage-
built in.
As provision is developed or refurbished,
communities will receive placename and
cultural information to make informed
choices.
Consultation on new build
school (Elgin HS complete
2026 and Forres Academy
early 2028) or major
refurbishments (planned
over the next 10 years with
Cullen PS first planned for
completion in 2025/26)
signage needs will consider
Gaelic language
requirements.
Learning Estate
Manager 
LIBRARY & HERITAGE
SERVICE: We will:
Success measure Target Timescale Lead
22 Rotate our Gaelic resources
around our larger libraries. We
will publicise the collection as
and when in each new location
and refresh and renew based on
demand as appropriate.
Increase number of residents
accessing the Gaelic
collection. Increase requests
for Gaelic materials.
Rotation every 6 months
Refreshed publicity materials
6 monthly cycles from
2025
Principal Librarian
23 Develop and promote Gaelic
activity as part of the annual
library services programme for
Book Week Scotland
(November).  We will feature
at least one Gaelic event and
will produce publicity and
promotional material
bilingually.
Increase interest in the event
(Baseline of 8) Suggestions
from participants on future
events.
Gaelic offer within the library
programme.
Bi-lingual promotional material
produced.
Social media coverage.
2025 Year 1 and
consistently thereafter
Principal Librarian
Page 164

Page 165

23
24 Develop awareness to actively
collect images of Morays
Gaelic Heritage to build a
database and share with
Canmore.
Moray Gaelic content
introduced to the collection
and promoted as there is
currently no Gaelic materials
within the Heritage Centre 
Deliver a Gaelic images project 
Promote “Gaelic Placenames of
Moray” by Iain Mac an Tailleir 
Deliver a Doric and Gaelic paper to
show synergies between the
languages,
2025 
2025 
Summer 2026 
CLDO & specialists 
Heritage Officer 
CLDO Specialists &
Partners 
COMMUNITY LEARNING &
DEVELOPMENT: We will
Success Measure Target Timescale Lead
25 Continue to service the
Corporate Gaelic Group, apply
for external funds & report on
activity and manage funding.
Attendance prioritised for
Gaelic meetings (minutes); 
Successful funding
applications to meet Gaelic
needs. 
Attend 4 corporate Gaelic group
meetings;
Apply to GLAIF and other external
funding for activity support; Support
Moray Gaelic Group to apply for
external monies and build capacity.
4 meetings minimum
per annum of the plan 
Applications made when
funds open
CLDO
26 Build on the “Exploring
Gaelic” sessions to staff and
community groups and support
an annual speaker’s programme
to highlight Gaelic interest and
culture.
Increased demographic range
of participants attending
3 sessions delivered on different
subjects
Spring, summer and
Autumn per year.
CLDO and
Moray Gaelic Group
27 Service and support a monthly
Strupag group to enhance
opportunities to use the
language and encourage new
learners and staff to the Gaelic
community.
Meetings take place.
Learners input ideas and
develop provision.
12 sessions per year Monthly meetings
throughout the Plans
lifespan
CLDO 
Fluent speaker
Page 165

Page 166

24
28 Seek opportunities to use the
“Gaelic Placenames of Moray”
publication to maximise its
reach
Training session delivered to
teaching staff and interested
departments. 
Potential development ideas
explored.
New collaboration developed
with plan holders and schools
50% of Associated School Groups
(ASG) will be represented at training.
Development of projects arising from
the session
2025 
2026
CLDO 
29 Develop a programme to
promote World Gaelic Week
building on the voices of
Moray Gaelic speakers and
learners.
Draw down external funding
to enhance the programme of
events and increase the
number of participants in
events.
Develop a programme for the Spring
event based on input from speakers
and learners.
Apply for external funding.
Deliver and evaluate the sessions.
24 Feb-2 March 2025
and annually thereafter.
CLDO
30 Promote Gaelic learning and
cultural opportunities to the
CLD workforce 
5 opportunities promoted
annually 
Gaelic content offered in
each year’s festival.
Share 5 opportunities through
newsletters, locality networks and
CLD Sways. 
Deliver Gaelic opportunities through
Learn North and the Winter Festivals 
Annual target 2025-
2030 
October – March each
year. 
CLDO and partners
31 Seek corporate and external
funding to secure a Gaelic
speaking CLD worker based on
identified need
Corporate and Councillor
support need for post. Budget
and external monies secured
to pilot the post
Full Council Report with evidence
from community activity and
highlighting the need for a post.
External funding applied for. 
2030 DCEO
Page 166

Page 167

25 
HR RECRUITMENT: We will Success Measure Target Timescale Lead
32 Amend the Vacancy
monitoring form to ensure
recruiting officers consider
Gaelic language criteria
Departments will consider
Gaelic in their functions and
as an asset in the skill set of
potential employees.
Paperwork amended to reflect
Gaelic skills
From January 2025 and
ongoing.
HR
33 Support and enable
opportunities for staff to learn
Gaelic and include it in staff
and elected member induction.
Induction module developed
to introduce the Plan and
responsibilities to Gaelic. 
Induction input developed. By August 2025 with
reviews annually.
Organisational
Development and
Gaelic partners 
ENVIRONMENTAL &
COMMERCIAL SERVICES:
We will:
Success Measure Target Timescale Lead
34 Introduce internal, bilingual
welcome signage in our public
buildings
Signage in place Communication Plan created by PR.
Welcome signage introduced to all
Council receptions.
August 2026 Head of
Environmental &
Commercial Services
35 Introduce external Gaelic
signage as opportunities arise 
New Gaelic signage
introduced 
Gaelic introduced where possible
when signs are replaced or introduced
in buildings, streets, roads, etc.
2025-2030 (As
opportunities present)
Head of
Environmental &
Commercial Services
36 Moray Growth Deal Cultural
Quarter project will follow
Moray Council corporate policy
regarding the adoption of
signage relating to the
construction of new facilities.
Signage in place Signage on Elgin Town Hall and
Grant Lodge will be designed and
implemented in line with Moray
Council policy.
Early, indicative opening
dates for the facilities: 
Elgin Town Hall – 2027 
Grant Lodge – 2028
Head of Economic
Growth and
Development (also the
Cultural Quarter
Project Senior
Responsible Officer)
Page 167

Page 168

26
37 Partnership working will be
strengthened between the
project and key agencies such
as Visit Scotland, Creative
Scotland and Historic
Environment Scotland (Project
Board members) 
Partners managing facilities
in the Cooper Park area
identify opportunities for
promoting Gaelic. with these
being discussed at the project
board 
Joint working to drive learning and
identify opportunities for inclusion in
the Cultural Quarter Action Log.
Throughout the design
and construction phase for
Elgin Town Hall and
Grant Lodge (now to
2028)
Head of Economic
Growth and
Development (also the
Cultural Quarter
Project Senior
Responsible Officer
38 With the cultural offering
associated with the Grant
Lodge facility due to be
developed, the project team will
evaluate and evidence options
for the integration of Gaelic in
Grant Lodge
Outputs evidenced from
planning activity, with Gaelic
related events recorded and
integrated.  
Clarity on the cultural offering
associated with Grant Lodge and how
Gaelic related activity fits within this.
Prior to the opening of
Grant Lodge 2028
Head of Economic
Growth and
Development (also the
Cultural Quarter
Project Senior
Responsible Officer) 
Page 168