Tuesday, 27 August 2024 
NOTICE IS HEREBY GIVEN that a Meeting of the Corporate Committee is to be
held at Council Chambers, Council Office, High Street, Elgin, IV30 1BX on
Tuesday, 27 August 2024 at 09:30. 
BUSINESS 
1. Sederunt 
2. Declaration of Group Decisions and Members Interests * 
3. Resolution
Consider, and if so decide, adopt the following resolution:
"That under Section 50A (4) and (5) of the Local Government
(Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Item 17 of business
on the grounds that it involves the likely disclosure of exempt
information of the class described in the relevant Paragraphs of Part 1
of Schedule 7A of the Act.”   
4. Minutes of meeting of 11 June 2024 7 - 12
5. Written Questions ** 
6. 2023-2024 Workforce Planning Report
Report by the Depute Chief Executive (Education, Communities and
Organisational Development)  
13 - 34
7. Information Governance Annual Report 2023-2024
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
35 - 38
Page 1

Page 2

8. Trusts Funds Summary Expenditure 2023-24
Report by the Depute Chief Executive (Economy, Environment and
Finance)  
39 - 46
9. Capital Plan 2024-25
Report by the Depute Chief Executive (Economy, Environment and
Finance)  
47 - 54
10. Revenue Expenditure to 30 June 2024
Report by the Depute Chief Executive (Economy, Environment and
Finance)  
55 - 78
11. Best Value Action Plan Progress Report
Report by the Depute Chief Executive (Education, Communities and
Organisational Development)  
79 - 84
12. Corporate Risk Register
Report by the Depute Chief Executive (Education, Communities and
Organisational Development)  
85 - 94
13. Localisted Poverty in Moray Update
Report by the Depute Chief Executive (Education, Communities and
Organisational Development)  
95 -
130
14. Moray British Sign Language Plan 2024-2030
Report by the Depute Chief Executive (Education, Communities and
Organisational Development)  
131 -
142
15. Review of Second Tier Governance Documents
Report by the Depute Chief Executive (Education, Communities and
Organisational Development)  
143 -
178
16. Review of Community Council Scheme and Election
Arrangements Report
Report by the Depute Chief Executive (Education, Communities and
Organisational Development)  
179 -
190 
Item(s) which the Committee may wish to consider with
the Press and Public excluded   
Page 2

Page 3

17. Progress on Collaborative Leadership Development
Work [Para 1]
• 1. Information relating to staffing matters; 
Watching the Meeting
You can watch the webcast live by going to: 
http://www.moray.gov.uk/moray_standard/page_43661.html    
Webcasts are available to view for 1 year following the meeting.  
You can also attend the meeting in person, if you wish to do so,
please come to the High Street entrance door and a member of
staff will be let into the building. 
Page 3

Page 4

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how
the individual or members of the group will vote on any item(s) of business on
the Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any
relevant and competent business within the specified remits not already on the
agenda, to the Chair provided it is received by the Proper Officer or Committee
Services by 12 noon two working days prior to the day of the meeting.  A copy
of any written answer provided by the Chair will be tabled at the start of the
relevant section of the meeting.  The Member who has put the question may,
after the answer has been given, ask one supplementary question directly
related to the subject matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the
consent of the Chair. If a Member does not have the opportunity to put a
supplementary question because no time remains, then he or she can submit it
in writing to the Proper Officer who will arrange for a written answer to be
provided within 7 working days. 
Page 4

Page 5

MORAY COUNCIL 
Corporate Committee 
SEDERUNT 
Councillor Bridget Mustard  (Chair)
Councillor Kathleen Robertson  (Depute Chair)  
Councillor Theresa Coull  (Member)
Councillor John Cowe  (Member)
Councillor John Divers  (Member)
Councillor Amber Dunbar  (Member)
Councillor Jérémie Fernandes  (Member)
Councillor Sandy Keith  (Member)
Councillor Scott Lawrence  (Member)
Councillor Marc Macrae  (Member)
Councillor Paul McBain  (Member)
Councillor Shona Morrison  (Member)
Councillor Derek Ross  (Member)
Councillor Draeyk van der Horn  (Member)  
Clerk Name: Tracey Sutherland
Clerk Telephone: 07971 879268
Clerk Email: committee.services@moray.gov.uk 
Page 5

Page 6

Page 6

Page 7

MORAY COUNCIL 
Minute of Meeting of the Corporate Committee 
Tuesday, 11 June 2024 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor Theresa Coull, Councillor John Cowe, Councillor John Divers, Councillor
Amber Dunbar, Councillor Jérémie Fernandes, Councillor Sandy Keith, Councillor
Scott Lawrence, Councillor Graham Leadbitter, Councillor Marc Macrae, Councillor
Paul McBain, Councillor Shona Morrison, Councillor Bridget Mustard, Councillor
Kathleen Robertson, Councillor Derek Ross, Councillor Draeyk van der Horn 
IN ATTENDANCE 
Interim Chief Executive; Depute Chief Executive (Education, Communities and
Organisational Development); Depute Chief Executive (Economy, Environment
and Finance); Head of Human Resources, ICT and Organisational Development;
Head of Governance, Strategy and Performance; Head of Financial Services;
Head of Housing and Property Services, Asset Management Co-ordinator and
Caroline O'Connor, Committee Services Officer.   
1.         Chair 
The meeting was chaired by Councillor Bridget Mustard.  
2.         Pre-Election Period 
The Chair reminded the Committee the meeting was taking place during the pre-
election period and that there are restrictions on the Council over publishing
material which could show support for a particular party.  As Council meetings are
webcast they fall within these restrictions.  
The Chair stated the advice from the Monitoring Officer was that, whilst the
Committee can continue to deal with "business as usual" items, should debate
become overtly political then the Chair may require to intervene.  
3.         Declaration of Group Decisions and Members Interests * 
In terms of Standing Orders 21 and 23 and the Councillors' Code of Conduct, there
were no declarations from Group Leaders or Spokespersons in regard to any prior
decisions taken on how Members will vote on any item on the agenda or any
declarations of Member's interests in respect of any item on the agenda.  
4.         Resolution 
The meeting resolved that in terms of Section 50A (4) and (5) of the Local
Government (Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Items 16, 17 and 18 of business
on the grounds that they involve the likely disclosure of exempt information of the
class described in the relevant Paragraphs of Part 1 of Schedule 7A of the Act.
Item 4.
Page 7

Page 8

Para number of
the minute Para Number of Schedule 7a
16 1
Information relating to staffing matters
17  1
Information relating to staffing matters
18
4
Information relating to any applicant or recipient of any
financial assistance provided by the Authority 
9
Information on terms proposed or to be proposed by or to
the authority 
5.         Minutes of meeting of 23 April 2024 
The minutes of the Corporate Committee of 23 April 2024 were submitted and
approved.  
6.         Written Questions ** 
The Committee noted that no written questions had been submitted.  
7.         Performance Report (HR ICT and OD) Period to March 2024 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing the Committee of the
performance of the service for the period to 31 March 2024.  
Following consideration the Committee unanimously agreed to:-  
i) note performance in the areas of Service Planning, Service Performance and
other related data to the end of March 2024; and 
ii) note the actions being taken to improve performance where required.  
8.         Performance Report (Governance, Strategy and Performance) Period
to March 2024 
The meeting had before it a report informing the Committee of the performance of
the service for the period to 31 March 2024.  
Following consideration the Committee unanimously agreed to:-  
i) note performance in the areas of Service Planning, Service Performance and
other related data to the end of March 2024; and 
ii) note the actions being taken to improve performance where required.   
Page 8

Page 9

9.         Human Resources ICT and Organisational Development and
Governance Strategy and Performance Service Plans 2023-2024 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) inviting the Committee to consider
the Human Resources, ICT and Organisational Development and Strategy,
Governance and Performance Services' Service Plans for 2024-25.  
Councillor Coull sought clarification on Appendix 2 in the Customer Services action
relating to reviewing the hours phone services, noting there was text missing text
in the "planned outcome" and "outcome measures" columns.  In response the
Head of Governance, Strategy and Performance apologised for the error and
confirmed the missing text was "centrally managed service". 
Following consideration the Committee unanimously agreed to approve the
Service Plans for services within Human Resources, ICT and Organisational
Development and Governance, Strategy and Performance.  
10.         Local Government Benchmarking Framework 2022-23 and 2021-22
Results 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) presenting to the Committee a
corporate overview of benchmarking performance data for the period 2022-23 and
2021-22.  
Following consideration the Committee unanimously agreed to note the Council's
performance in terms of a corporate overview of benchmarking results.  
11.         Workforce Working Group 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) updating Committee on the
progress made and planned areas of work for the Workforce Working Group.  
Following consideration the Committee unanimously agreed to note the planned
areas of work for the Workforce Working Group and that these will be included in
the Workforce Plan and brought forward for future consideration by this
Committee.  
12.         Performance Report (Financial Services) Period to March 2024 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) inviting the Committee to consider the Financial
Services Plan for 2024-25.  
Following consideration the Committee unanimously agreed to approve the
Service Plan for Financial Services.  
13.         Financial Services Service Plan 2024-25 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) inviting the Committee to consider the Financial
Services Plan for 2024-25.  
Page 9

Page 10

Following consideration the Committee unanimously agreed to approve the
Service Plan for Financial Services.  
14.         Common Good Funds - Summary Expenditure for 2023-24 and
Estimated Disposable Income for 2024-25 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing the Committee of the final position of
Common Good Funds at 31 March 2024 and the estimated income available for
disbursement in 2024/25.  
Following consideration the Committee unanimously agreed:-  
i) to note the disbursements approved for 2023/24 for each of the Common
Good Funds shown in Appendix 1; 
ii) to approve the carry forward of the disbursed balances for 2023/24 for the
Buckie, Cullen, Dufftown, Elgin, Forres, Portknockie, Keith and Findochty
Funds to be made available in 2024/25; 
iii) the estimated income available for disbursement in 2024/25 shown in
Appendix 1; 
iv) to approve that Millbuies is held separately from Elgin Common Good Fund
and that the harvesting income is excluded from the two thirds distribution
policy and is re-invested in Millbuies Park as shown in Appendix 1; 
v) to note the Balance Sheet for each Common Good in Appendix 2; and 
vi) to note the Common Good Fund Asset Register in Appendix 3.  
15.         Property Asset Management Appraisal 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) providing a progress update on outstanding
recommendations set out within the Property Asset Management Appraisal
(PAMA).  
Following consideration the Committee unanimously agreed to note the progress
of outstanding recommendations set out within the Property Asset Management
Appraisal and detailed in Section 4 of the report.  
16.         Voluntary Early Retirement and Severance Applications [Para 1] 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) asking the Council to consider
applications under the terms of the agreed Voluntary Early Retirement (VER) and
Voluntary Severance (VS) Schemes. 
Following consideration the Committee unanimously agreed to approve the
applications for Voluntary Early Retirement and Voluntary Severance contained
within Appendix A.   
Page 10

Page 11

17.         Early Retirement Application [Para 1] 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) asking the Committee to consider
an application for Early Retirement under the terms of the Council’s agreed
Pension Discretions. 
Following consideration the Committee unanimously agreed to approve the
application for Early Retirement.  
18.         Common Good Property in Forres [Paras 4 and 9] 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) inviting the Committee to consider an application for the
purchase of a Common Good property in Forres and if so minded, to approve
public consultation on the proposal.  
Concern was raised by members of the Committee on the timing of any
consultation noting there may be risk of an adverse impact on the public
consultation for the new Forres Academy.  In response, the Chief Financial Officer
advised there were no timescales set out in statute and the consultation could
therefore be deferred until the Forres Academy consultation had taken place.  
Councillor Leadbitter moved an amendment to the wording of Recommendation (i)
so it would read "approve preparatory work on publication consultation".  
The Depute Chief Executive (Economy, Environment and Finance) suggested a
further amendment to add wording to the end of Recommendation (i) with the
addition of the words "and consultation to be deferred until the consultation on
Forres Academy is concluded".  
There being no-one otherwise minded the Committee unanimously agreed to:-  
i) approve preparatory work on public consultation on the proposal to
purchase the property at Clovenside at a price sufficient to generate income
to Forres Common Good equivalent to the rental income currently paid for
that property, and consultation to be deferred until the consultation on
Forres Academy is concluded; and 
ii) note that a second report on the results of the consultation will be brought
back to this Committee with recommendations regarding the proposal as
informed by the consultation.   
Page 11

Page 12

Page 12

Page 13

REPORT TO: CORPORATE COMMITTEE 27 AUGUST 2024 
SUBJECT: 2023-2024 WORKFORCE PLANNING REPORT 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the progress made against the workforce strategy
and plan for the period 2023-2024 and to consider the proposed workforce
strategy for 2024-2027 and 2024-25 action plan. 
1.2 This report is submitted to Committee in terms of Section III (B) (24) (c) of the
Council's Scheme of Administration relating to the recruitment, training and
development, health, safety and welfare policies and practices of the Council. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee: 
(i) consider and note the progress made against the 2023-24
workforce plan; 
(ii) approve the proposed Workforce and Organisational Development
Strategy and Plan for 2024-2027 as set out in Appendix A; and 
(iii) note the positive contribution from the short life Workforce
Working Group. 
3. BACKGROUND 
3.1 The Council’s Workforce and Organisational Development Strategy and plan
set out how the Council will prepare and manage the workforce to be able to
respond to the agreed Council priorities as set out in the Corporate Plan and
the work that is required to support and achieve those objectives. 
3.2 This is based on the firm belief that the Council’s workforce is fundamental in
delivering high quality and improving council services that will enable
sustainable transformation.  Workforce planning allows the Council to ensure
that the workforce is skilled, equipped, managed and deployed effectively
ensuring the Council can meet current and future demands. 
Item 6.
Page 13

Page 14

4. CURRENT ISSUES AND PRIORITIES 
4.1 The Council continues to experience recruitment difficulties across multiple
service areas including some teaching posts, specialist professional and
senior management posts, fleet services and social care.   While some
specific actions have been progressed during 2023-24, there is further work
required which is carried forward into the 2024-25 plan. 
4.2 Work to address Best Value scrutiny challenges has culminated in a
consolidated Action Plan, the contents of which require to be progressed at
pace.  These include swift progress on the development of a leadership
development provision to ensure corporate and individual leadership needs
are developed and supported.   It is also recognised that further refinements
are required to improve the Council’s ability to measure the success of the
actions within the workforce plan with a balance of both qualitative and
quantitative measures.   While some changes have been added to the
workforce plan in this regard, further consideration will be given to additional
measures as part of the planned work. 
4.3 With the requirement to find further savings to meet the Council’s structural
budget deficit, the pace and depth required for progress with transformational
change, reshaping to the Council of the future and changes to ways of
working to become a more sustainable organisation, a Transformation
Strategy has been agreed that sets out current and future work.   Analysis of
these projects will identify the workforce planning requirements required to
inform the workforce development needed to support each discrete area of
work and cross-cutting themes. 
4.4 In response to the 2023 Employee Survey results, a short life Workforce
Working Group has been convened to consider workforce information that
supports Elected Members and officers to address issues and support a
positive workforce culture.   Main themes that arose and which are reflected in
the Workforce Plan include apprenticeships and the young workforce,
skills/workforce development, recruitment challenges, readiness for change,
absence and leadership development.  
4.5 Taking account of the above as well as work that has been carried forward
into this year’s plan, the priorities for 2024-27 are: 
Developing Leadership Capacity – to prepare leaders with strong
leadership skills for leading transformational change. 
Workforce Planning – to use data effectively to plan, manage and deploy the
workforce to ensure achievement of the Council’s key corporate priorities and
objectives. 
Workforce and Organisational Development – to ensure that employees
are empowered and enabled to embrace and be prepared for change. 
Recruitment and Selection – to ensure that Council services are well-
resourced with an attractive employment package and recruitment strategies
tailored to local requirements.
Page 14

Page 15

Health and Wellbeing – to pro-actively support the health and wellbeing of
employees including managing sickness absence effectively and addressing
the challenges of managing challenging behaviours that result in violence and
aggression against staff. 
5. PROGRESS ON 2023-2024 WORKFORCE PLAN ACTIONS 
5.1 Developing Leadership Capacity 
(i) The blended approach of development activity has continued and work
on the future leadership requirements is ongoing to ensure that the
leadership capacity to lead change required is achieved. 
(ii) The strategy for the development of Elected Members has been
delivered as per the programme during 2023-24 and is being reviewed
to ensure alignment with the Leadership Development Programme for
Officers.
(iii) Supervisory training has been provided to support the development of
future managers including First Line Managers course, Skills for
Change, an introduction to Moray Management Methods, Coaching
Skill along with procedural training on Recruitment and Selection,
Disciplinary and Managing Health at Work.  
5.2 Workforce Planning and Change 
(i) Review of Transform process to accommodate the introduction of the
No Compulsory Redundancy policy amendment to the Council’s
agreed Change Management Policy and Procedures has been
completed and is operational.  
(ii) Workforce implications of service redesign and change have been
managed through agreed procedures across services including the
budget consultation process.
(iii) Departmental workforce planning was completed as part of an annual
cycle.
(iv) Review of vacancy management process is ongoing to respond and
proactively manage the changing demands of services.
(v) Support to Health and Social Care Moray continues for impending
budgetary changes. 
(vi) Introduction of a Skills for Change Workshop to address any skills gaps
on supporting the management of change.
Page 15

Page 16

5.3       Workforce/Employee Organisational Development 
(i) Identified training needs have been met through the centralised training
function based on service requests.
(ii) The number of appraisals undertaken is reported through management
PIs on a quarterly basis.  A review of the Management and Staff
appraisal process is ongoing and will be concluded during 2024-25 to
ensure a process that is fit for purpose, increases engagement and
supports both service and individual improvement. 
(iii) Developed and delivered an Organisational Development plan to
support the embedding of Flexible Working following the pandemic via
the Smarter Working project including engagement workshops,
training, guidance documents and resources. 
5.4       Future Proof Employer of Choice Workforce and Succession Planning 
(i) Work on a corporate apprenticeship approach was paused during the
budget savings process.   Informal arrangements are in place to work
with services in considering the use of apprenticeships schemes to
upskill the workforce and provide opportunities for internal candidates.
Work is also ongoing with Social Care services to develop a pathway
into the caring professions using Foundation and Modern apprentices. 
(i) Recruitment work includes a review of Moray’s MyJobScotland page to
support the attraction of new candidates, a review of the Recruitment
and Selection Policy (ongoing), consideration of market forces impact
and draft policy and agreement of professional fees assistance.
(ii) The development of a Talent Management and Succession Planning
Toolkit is underway, with a proposal to be presented in Quarter 3 of
2024-25 and the aim to have operational by 2025 and will support
building internal capacity. 
5.5 Health and Wellbeing 
(i) Mental Health First Aid training was delivered via the Flexible Working
Development Fund.  
(ii) Management of absence cases continues to be supported on a
targeted basis through provision of professional advice to managers
with training on the implementation of the Health and Work Policy and
Procedures delivered to managers and trades union colleagues.
(iii) The Local Government Benchmarking Framework national absence
figures for 2022-23 indicated increased sickness absence rates ranking
27th out of 32 for sickness absence days per teacher and 12th out of
32 for local government employees.   
Page 16

Page 17

6. EMPLOYEE ENGAGEMENT AND CULTURE 
6.1 Employee engagement and culture activity has resumed to a business-as-
usual approach with a fuller engagement programme being delivered over
2023-24 comprising service-learning visits, Connect and strategy talks, Bright
Ideas, STAR (Special Thanks and Recognition) Awards (employee
recognition), employee survey and Team Talk. 
6.2 Following completion of analysis of the Employee Survey in 2023 a short life
working group has been established to address issues arising and will provide
leadership and demonstrate commitment to the required areas for
development. This group was established in 2024 with representatives from
the Central Management Team, Elected Members, Heads of Service and
Trade Unions and will agree actions to support the continued development of
a positive workplace culture (referred to in paragraph 4.4). 
6.3 Team Talk Dialogue was delivered to support and engage with the workforce
during the budget consultation process in 2023-24.  This process has been
reviewed following Stage 1 and 2 feedback and a new approach is in place to
support future budget consultation processes. 
7. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The work noted in this report supports the Council to achieve the
priorities and objectives in the Corporate and 10 Year Plan.  It sets out
how the Council will meet the challenges in making best use of the
workforce and resources.  The actions also ensure continued progress
towards the aims of ensuring an engaged workforce with a positive
workforce culture. 
(b) Policy and Legal
There are no legal implications arising directly from this report although it
remains possible that symptoms of a poor workforce culture such as
bullying and harassment could lead to legal challenges against the
council. 
The work that is ongoing and planned in relation to employee
engagement and workforce culture continues to provide a solid
foundation from which to develop further work to address any workforce
related and cultural issues that may arise. 
It is also important to recognise the importance that the Scottish
Government places on the people working in the public sector to deliver
the reforms identified by the Christie Commission including the principles
of Fair Work.  The links to workforce planning and thereby to
demonstrating best value are important considerations for the council. 
(c) Financial implications
There are no financial implications arising from this report. 
Page 17

Page 18

(d) Risk Implications
The workforce strategy and plan are based on assessment of the issues
and risks anticipated in relation to the council’s workforce and identified
actions to address these.  Previous reductions in size mean that the HR
and OD teams are already stretched.   With the workforce changes
anticipated the focus will be on legal requirements first and foremost. 
The actions in the workforce plan have been prioritised and if necessary
activity will be reduced or ceased on those actions ranked lowest.   
The risks associated with workforce culture are around the
consequences of leaving the culture issues unaddressed and the
complexity and challenge of dealing with behavioural issues.  The
developmental nature of the work combined with the long-term nature of
establishing a cultural shift in behaviours means there are long term
maintenance requirements to be accommodated before a permanent
step change in culture can be achieved. 
(e) Staffing Implications
There are no direct staffing implications arising from this report. 
However, it will be challenging for the HR service to deliver the actions in
the workforce plan and this will be monitored carefully. 
As the Council seeks to transform and modernise and prepares its
financial plans, it is likely that specific workforce issues will emerge. 
Work will be undertaken as proposals are developed to identify the
specific workforce issues and these will be managed through the well-
established change management and Transform processes.  Account
will also be taken of the whole council strategic management of these
workforce issues as they emerge by involving the HR team in the
planning of the required changes. 
(f) Property
There are no property implications arising from this report. 
(g) Equalities/Socio Economic Impact
There are no equalities or socio-economic issues arising from this report. 
(h) Climate Change and Biodiversity Impacts
No climate change or biodiversity implications have been determined as
a result of the content of this report. 
(i) Consultations
The content of this report and the appendices have been considered by
the central and senior management teams and the Workforce Working
Group and will be on the agenda for the next Trade Union / Officer
Group and Local negotiating Committee for Teachers meetings. 
8. CONCLUSION 
8.1 The Council is required to have robust workforce planning
arrangements in place to ensure the delivery of services.   There has
been progress against the majority of workforce plan actions since April
Page 18

Page 19

2023 despite a heavy focus on the workforce implications of budget
savings proposals. 
8.2 The Workforce and Organisational Development Strategy sets the
direction for 2024-2027 and the plan sets out the planned work for 2024-
2025 with a focus on managing the workforce implications of change
and transformation, preparing the workforce for change and future
demands, ensuring leadership capacity is developed and continuing to
address and respond to recruitment and retention challenges whilst
ensuring the health, safety and wellbeing of the workforce. 
Author of Report: Frances Garrow, Head of HR, ICT & Organisational
Development
Background Papers: Corporate Workforce Report (2023-24) 
Workforce Plan Conclusions (2023-24)
Ref: Appendix A: 2024-2027 Workforce and Organisational
Development Strategy and Plan (2024/25) 
Page 19

Page 20

Page 20

Page 21

APPENDIX A 
1
MORAY COUNCIL 
WORKFORCE AND ORGANISATIONAL DEVELOPMENT STRATEGY 
(2024-2027) 
Item 6.
Page 21

Page 22

APPENDIX A 
2
CONTENTS 
Section     Page 
1 Introduction    3
2 Corporate Vision   3
3 Context    4
3 Priorities for 2024-27  5
5 Plans     8
6 Resources    8
7 Review    9
8 Action Plan    9 
Page 22

Page 23

APPENDIX A 
3
MORAY COUNCIL
WORKFORCE & ORGANISATIONAL DEVELOPMENT STRATEGY 
(2024-2027) 
1  Introduction 
The purpose of the workforce and organisational development strategy is to help the
council develop and maintain a skilled, motivated and flexible workforce and to adapt as an
organisation to be able to deliver sustainable services to the community that make a
difference, address inequality and are fit for purpose.   
Moray Council aims to manage the workforce effectively and in alignment with the
corporate and financial planning processes to ensure that the Council has the workforce it
requires with the right skills, deployed and managed where and when required. 
The broad aims of the strategy and plan are to: 
- Provide clear leadership, direction and model behaviours to foster a positive and
respectful workplace
- Maximise our capacity and performance e.g. ensuring we recruit skilled experienced
people and developing our workforce to adapt to future requirements
- Enhance employee experience and wellbeing by continually improving our culture
and engagement 
2 Corporate Vision 
The council’s vision within the Corporate Plan is for a Moray where people prosper, free
from poverty and inequality so that: 
• Our young people grow up safe, well-educated and reach their full potential
• People lead healthy lives and have access to quality care when they need it
• Our businesses and communities prosper
• Our natural environment thrives for the betterment of all 
Our organisational values define who we are and how we deal with the community,
partners, and staff:
• Fair – tackling inequalities, treating people fairly, promoting equalities and
awareness and considering our impact on others
• Ambitious – outward looking, promoting and celebrating Moray, being a great place
to work and ensuring sustainable and efficient council services
• Improving – driving improvement, encouraging innovation, taking commercial
opportunities and investing in transforming to meet future needs
• Responsive – open and transparent, promoting community participation and
involvement, listening to and involving our communities 
Our priorities are tackling poverty and inequality, building a stronger, greener, vibrant
economy and building thriving, resilient and empowered communities.
Page 23

Page 24

APPENDIX A 
4
3 Context 
National – recruitment challenges across professions such as Teaching, Social Care and
specialist professional posts have an impact on the availability of skilled and experienced
candidates locally.   The flexibilities from hybrid and remote working that has increased as a
response to the COVID-19 pandemic have also depleted the local pool of candidates for a
range of posts including ICT, Communications and Finance.   
Local – despite the presence of two military bases and public sector organisations, Moray is
described as a low wage economy with a higher than national average number of older
people.   There is a pattern of young people either leaving the area for higher education and
not returning or leaving school to enter local employment in the low wage industries such as
retail, farming or agriculture. 
Council - with a higher than national average proportion of older citizens and a high number
of young people leaving the area the main challenges to be addressed are boosting the
number of younger people who work for the Council and ensuring the capacity to recruit for
key areas of service delivery such as within Social Care, Social Work, some promoted and
subject specialist areas of Teaching and a range of specialist professional posts, ensuring
sustainable and efficient service delivery while meeting increasing demands on services.   
Service specific - issues arising from the annual workforce planning process identify
common themes as a requirement for management and leadership development activity,
effective communication and engagement, particularly during periods of change, ensuring
employees are empowered and enabled to embrace change and ensuring the employment
package is attractive. 
In addition, the Council has been addressing the Best Value scrutiny challenges.  This work
has recently culminated in a consolidated Best Value Action Plan that sets out a
comprehensive plan of actions that require to be progressed at pace.   These include
progress on development of a leadership development programme to make sure corporate
and individual leadership needs are supported so that the Council has the capacity to lead
the organisation through the changes that are required and ensuring equalities training is
provided.   
Pressures and priorities for services such as increased demand, reducing budgets and
having to find new ways to meet current and new areas of need mean having to prioritise
what and how services are delivered. At an organisational level, this requires increased
pace and depth of transformational change, reshaping to the council of the future, changes
to ways of working and finding ways to become more sustainable.   To address this the
Council has a newly agreed Transformation Strategy that sets out a series of current
projects that are currently progressing as well as identifying scope for further transformation
and innovation to inform the next stages.   As these progress, analysis will inform the
workforce planning requirements required to support the transformation projects and overall
direction and pace. This means there is a requirement for strong leadership to provide
vision and direction, workforce development to prepare for and deliver transformation and
change and ensuring the council can recruit and retain the right people to take this work
forward.   
Page 24

Page 25

APPENDIX A 
5
A short life Workforce Working Group has also been established to consider workforce
information which supports the Elected Members and officers to address issues and take
assurance or otherwise of progress being made in the development of the culture the
Council wishes to promote. The Group identified the following themes for consideration for
inclusion in the Workforce Plan: 
a. Apprenticeships, young workforce;
b. Developing the workforce, career progression, skills development – with a
view to assisting with recruitment and contributing to a positive culture;
c. Recruitment – addressing the range of challenges across services and jobs;
d. Readiness for change – ensuring the workforce culture and skills are in place
to enable and support change;
e. Absences – noted increasing trend of absence rates and need to tackle from
health and well-being and financial perspectives; 
f. Leadership development (noted as being in Best Value Action Plan). 
4 Priorities for 2024-2027 
Transformational change, strong leadership and workforce development take time to
deliver.   Operating with leaner structures and reduced capacity suggests an effective
approach is to empower people within and across services.   This requires a clear vision,
purpose and direction, set through strong visible leadership with supporting systems and
infrastructure that provide a framework of guidance and support to help foster a culture of
initiative and innovation which ultimately will enable the development of flexibility and
adaptability within teams and across services. Developing leadership skills and capacity is
therefore a key priority to ensure a strategic approach to creating an environment that
encourages transformation, effective communication and engagement,  improved
performance across services and encouraging collaboration and partnership working. 
Enhancing workforce flexibility and adaptability to be able to meet the council’s future
requirements will remain a major theme for the foreseeable future.  This is likely to also be
tailored to service specific requirements such as having a needs led and people focused
approach in health and social care and a customer focus for front line operational teams.   
Recruitment challenges include increased turnover, fewer suitably qualified and
experienced applicants applying for council jobs, issues recruiting in specific areas such as
craft and fleet services, social work,  social care and some teaching posts and demand
anticipated to increase in sectors such as social care and social work, specialist and senior
posts.  In addition to this, the increased flexible and remote working opportunities available
generally has impacted on recruitment to posts for which job holders previously would have
had to be located in Moray, further depleting the pool of potential candidates.  There is the
capacity to mitigate this impact in terms of attracting people living elsewhere to work
remotely for the Council, however there are specific consequences to this which would
have to be carefully balanced and considered. While this is a pattern that is evident
nationally and at least in part relates to a shortage of supply, the situation is exacerbated by
Moray’s remote geography and the size and scale of some of our services.  The Council will
continue to identify ways to nurture and develop talent to meet future demand including
Page 25

Page 26

APPENDIX A 
6
encouraging the use of traineeships and apprenticeships where sustainable and will meet a
recruitment gap and to promote developing the workforce, career progression and skills
development with a view to assisting with recruitment and contributing to a positive culture. 
Underpinning all of the above is the requirement to ensure staff health, safety and wellbeing
for a safe, healthy and resilient workforce.   Post-pandemic has seen an increasing trend of
sickness absence which has a cost in terms of both health and well-being as well as
financial and operational service delivery and progress of agreed programmes of work.   
The main workforce priorities for this plan therefore are: 
• Developing Leadership Capacity 
• Workforce Planning and Change
• Workforce and Organisational Development
• Recruitment and Retention
• Health and Wellbeing 
Developing Leadership Capacity: prepare and develop strong and visible current and future
leaders to provide the strategic and organisational capacity to develop the agenda for and
direction of the organisation. 
Long term constraints on public spending continue to require innovative approaches to
services with a focus on preventative spending through early proactive interventions. 
Partnership and joint working is increasingly important as part of this agenda to ensure that
services respond to local needs in a cohesive manner.   Project management and the
development of the ‘soft skills’ required to create an environment of change and
transformation are also key. 
Leadership and management skills and capacity are a key priority to enable the culture of
the organisation to adapt and change to meet the challenges of changing service delivery
particularly within the context of reduced budgets.  Developing our leaders to have the
skills, influence and impact to lead the organisation through the next phase of
transformation and change will require new approaches, skills and strengths. 
To address these issues we will: 
 Establish a leadership development programme to address corporate and individual
leadership needs including collaborative and distributed leadership
 Develop collaborative leadership skills required to support transformation
 Cascade a programme of leadership development activity that enables and
empowers strong visible leadership across the organisation 
Workforce Planning and Change: manage the contraction and re-shaping of the Council
workforce to achieve a sustainable skilled and motivated workforce for the future aligned to
the Council’s priorities. 
Funding arrangements and the cumulative effect of ongoing annual savings to support
future sustainability mean that the impact of this is likely to be on particular services more
than others.   Transform is the Council’s approach to managing change to reshape the
Page 26

Page 27

APPENDIX A 
7
workforce to achieve a reduction in the pay bill and number of people employed and to
minimise compulsory redundancies, providing security of employment as far as possible. 
To manage workforce change we will:
 Continue with the Transform approach (and relevant change management
procedures for teaching staff) to manage workforce changes 
 Manage employee relations and consultation comprehensively and sensitively in
relation to workforce change 
Workforce and Organisational Development: ensure that employees are empowered and
enabled to embrace and be prepared for change through encouraging flexibility and
adaptability as new ways of working are brought in and roles develop and change as a
result of service delivery changes.   
To address these issues we will:
 Develop, implement and review initiatives to create a culture where employees are
prepared for and embrace change
 Support employees to adapt to new ways of working that will make the council more
efficient and provide improved levels of service to customers including improving and
embedding digital skills and competence
 Review Management Appraisal Framework 
Recruitment and Retention: ensure that Council services are well-resourced by making the
Moray employment package as attractive as possible and deploying recruitment strategies
tailored to local requirements. 
Analysis of recruitment difficulties being experienced by the Council indicates that the
underlying reasons can generally be grouped as follows: 
• Qualifications - insufficient or no qualified candidates (for professional posts)
• Experience - qualified candidates but no experience (for professional senior or
management posts)
• Market Forces - candidate pool available but turning down jobs as able to earn more
working in other local sectors e.g. retail, construction, oil and gas
• Visibility – lack of visibility of council jobs if not looking on My Job Scotland
In addition to this the expansion of remote / flexible working has opened up opportunities for
jobs further afield which has increased the competition for high calibre candidates locally.     
There also remain residual issues across a range of services, including promoted posts,
some secondary teaching and promoted posts, specialist professional posts, social work
and fleet.  Within Education, while there are constraints in part due to a national supply
shortage, there is added complexity from the rural nature of Moray and our small schools,
which attract lower salaries for promoted posts.  More broadly, there are national shortages
of Social Workers, Environmental Health Officers, Trading Standards Officers as well as
local skills shortages in fleet services. 
To address these issues we will:
Page 27

Page 28

APPENDIX A 
8
 Refresh and promote the profile of Moray Council as an employer of choice to
promote employment opportunities and benefits of employment with the Council and
living in Moray linking with local economic partnership initiatives where possible
 Establish clear pathways for support, training and experience for professional
development for professional and specialist posts (grow your own)
 Develop trainee and apprenticeship programmes where these are considered a
viable solution to areas with recruitment challenges 
 Develop an approach to succession planning that builds internal capacity whilst
ensuring equal opportunity 
Health and Well-being: pro-actively support the health and well-being of employees. 
It is important that employees are supported to attend work and managers supported to
proactively manage sickness absence.  The main causes of absence in the Council are
mental health and musculo-skeletal disorders.  Targeted action is taken in areas where
absence is highest with specific attention paid to services with a direct replacement cost
(i.e. Teachers, Social Care).     
The Annual Health and Safety report identifies a continuing issue with increasing numbers
of incidents of violence and aggression within schools.    Work to address this is underway
as part of the Additional Support Needs Review. 
To address these issues we will:
 Seek to increase awareness and understanding of mental health and the impact on
sickness absence
 Review proactive measures that may reduce sickness absence rates including
viability of day one absence reporting solution 
 Review operational implementation of the absence management policy and
procedures to ensure efficient and effective deployment  
 Provide support for reducing incidents of violence and aggression in schools as set
out in the agreed Additional Support Needs action plan and joint working group 
5 Plans 
The delivery of this strategy is set out in more detail in the Corporate Workforce Plan. 
As circumstances develop throughout the period of the strategy, the management of the
workforce will adapt to address issues as they emerge. Workforce planning requires a long-
term approach and so in a number of areas work will build from research and projects
carried out under previous workforce plans. 
6 Resources 
Reducing resources continue to be stretched within the HR and OD services and while this
strategy recognises the workforce issues and sets direction, a more stringent degree of
prioritisation is required as it is not possible to take all of the actions forward.   
7 Review 
Page 28

Page 29

APPENDIX A 
9
Monitoring and review will take place through the agreed performance management
framework as well as to the Personnel Forum and the Central Management Team with 6
monthly updates which will highlight any workforce plan adjustments required related to the
budget and corporate financial planning.  The workforce plan will be an evolving document
that is modified to respond to issues as they arise specifically including continuous
improvement in key areas and ensuring there is a focus on delivery of priority outcomes. 
There will be a formal annual review of the plan and strategy which will include input from
the Trades Union / Officer Group and Local Negotiating Committee for Teachers. 
CORPORATE WORKFORCE PLAN 2024-25
Priority Rating: 
1 – critical in terms of scale of impact and/or to success of other actions
2 – wide scale impact and/or supports achievement of other outcomes  
3 – clear benefits but importance may be outweighed by other actions 
4 – ongoing area of work where further development is not required at this stage 
BV – Best Value Action
SP – Service Plan Action 
ACTION REQUIRED PLANNED OUTCOME Completion 
TIME-SCALE
Lead Officer
*Key at end
Priority
Rating 
Developing Leadership Capacity:  prepare and develop strong and visible current and future leaders to provide the
strategic and organisational capacity to develop the agenda for and direction of the organisation
1.    Develop and
implement
redesigned
leadership
development to
ensure it develops
the skills and
behaviours
necessary for
leadership of the
corporate and
strategic direction
required for
transformation
(BV 1.3 & SP) 
Leaders are developed to lead the
response to the challenging agenda, the
Council is prepared for the future and
makes sustained progress in its
improvement and transformation work 
Leadership development programme
implemented that addresses corporate
and individual leadership needs
Culture of transformation and change,
innovation and strategic decision
making enabled 
Measures:
Leadership development courses in
place for corporate and Education
environments
80% Senior and service managers and
Head Teachers have attended
leadership development training
Improvements in awareness of key
learning points:
Skills analysis survey developed
developed and implemented:
Dec 2024  H/HR, ICT & OD,
ODM
1
Page 29

Page 30

APPENDIX A 
10 
ACTION REQUIRED PLANNED OUTCOME Completion 
TIME-SCALE
Lead Officer
*Key at end
Priority
Rating 
Year 1 - baseline established
Year 2 – 10% improvement in Year 
10% improved employee survey results
2.    Provide targeted
management and
supervisory
development that
is responsive,
empowers
employees and
addresses
pressures in the
system 
Managers and supervisors are
developed to lead challenging agenda,
empower and enable teams and
individuals to foster innovation and
create flexibility and adaptability to
embrace change and transformation.
1. Targeted interventions and
approaches designed to address
areas of pressure
2. Responsive and empowered
managers developed to cascade
responsive and empowered approach
to teams
3. Culture of transformation, innovation
and collaborative working fostered
across services 
Measures: Training delivered to 75% of
managers 
5% point improvement to people
management questions in employee
survey
Uptake of management development
activity monitored including service
specific (e.g. Moray Management
Methods training, Standards for
Headship and Middle Leaders for
Education):
Year 1: baseline established
Year 2: 5% increase
Year 3: 2.5% increase
Mar 2025 ODM 2
Workforce Planning and Change: manage the contraction and re-shaping of the Council workforce to
achieve a sustainable skilled and motivated workforce for the future aligned to the Council’s priorities
 Transformation
and change:
Transform
approach used to
align workforce
Workforce change is managed in a
structured and consistent way and
achieves the desired change, reducing
headcount where necessary in
accordance with agreed policy and
procedure and in line with the current
As required  HRM / ODM 4 
Page 30

Page 31

APPENDIX A 
11 
ACTION REQUIRED PLANNED OUTCOME Completion 
TIME-SCALE
Lead Officer
*Key at end
Priority
Rating 
implications of
change with
relevant solutions
deployed 
Continue to actively
manage vacancies
to prepare for
future changes
(SP)
No Compulsory Redundancy principle
Measures: 
Reduction in headcount
Number of departures under voluntary
schemes balancing cost and
organisational requirements
Number of redeployments
Number of supernumerary employees
Number of compulsory redundancies 
 Manage employee
relations and
consultation
comprehensively
and sensitively in
relation to
workforce
changes
Employee relations aspects of managing
change at service and corporate level
undertaken effectively and in good time 
Measures: Workforce changes
completed in accordance with agreed
policy and procedure 
Change management evaluation survey
implemented for each change
management exercise
75% of evaluation feedback positive 
As required H/HR&ICT/HRM 4 
Workforce and Organisational Development: ensure that employees are empowered and enabled to
embrace and be prepared for change through encouraging flexibility and adaptability as new ways of
working are brought in and roles develop and change as a result of service delivery changes
1.    Ensure workforce
is empowered and
enabled to embrace
and be prepared for
change (SP) 
Workforce is prepared for and embraces
change, with flexibility to adapt and
develop to future requirements 
Measures:
10% point improvement in employee
survey questions on change 
Mar 2025 ODM 1
2.  Review
Management
Appraisal Framework
Management Appraisal Framework to
be reviewed to reflect current and
future requirements of managers and
ensure optimum performance
management and ongoing development
Measure: Above produced,
implemented and positive feedback
received
Oct 2025 ODM 3
Page 31

Page 32

APPENDIX A 
12 
ACTION REQUIRED PLANNED OUTCOME Completion 
TIME-SCALE
Lead Officer
*Key at end
Priority
Rating 
Recruitment and Retention: ensure that Council services are well-resourced by making the Moray
employment package as attractive as possible and deploying recruitment strategies tailored to local
requirements
1.  Review and refresh
recruitment and
retention activities to
deploy appropriate
recruitment strategies
that promote
employment
opportunities and
raise the profile of
Moray Council as an
employer of choice
including pathways for
development for
internal candidates
and youth
employment (SP)
Recruitment attracts high calibre
candidates and council services are well-
resourced
Key corporate priorities and resources
are appropriately resourced to ensure
completion and achievement of
objectives and outcomes
Un-resourced areas are flagged for
consideration with risks and issues
noted
Measures:
10% reduction in repeat adverts
5% increase in number of young people
employed 
1% reduction in turnover 
Measure established for  time taken
from advert to first day of employment
Positive feedback from managers
through Personnel Forum 
Mar 2025 HRM 1
2.  Succession
Planning: 
Approach developed
that builds internal
capacity and
contributes to a
positive culture (SP)
To build internal capacity through
workforce development, career
progression and skills development
whilst ensuring equal opportunity so
that internal candidates are enabled to
put themselves forwards for
development opportunities that provide
the required experience and skill set to
apply for alternative or promoted
positions. 
Measures:
Measures for number of internal
applicants developed:
Year 1 – measure/baseline established
Year 2 – 5% increase in volume of
internal applicants
Year 3 – 2.5% increase 
5% increase in number of career
progression opportunities 
Mar 2025 ODM 2
Health and Well-being: pro-actively support the health and well-being of employees
Page 32

Page 33

APPENDIX A 
13 
ACTION REQUIRED PLANNED OUTCOME Completion 
TIME-SCALE
Lead Officer
*Key at end
Priority
Rating 
1. Support the
implementation of
the Council’s
Health and Work
policy in order to
deliver ongoing
improvements in
absence levels with
focus on proactive
support for
attendance and
wellbeing including
review of Day One
notification for
focus on short
term absence and
revised operational
implementation of
absence
management
procedures by
managers
(SP)
Absence is managed effectively and
levels of absence are reduced efficiently
and timeously to achieve a sustained
reduction in absence levels as measured
through the Local Government
Benchmarking Framework PIs.
To improve the awareness of and
management of mental health (as a
main cause of absence) within the
workforce.
To instigate proactive measures to
promote health and well-being as
preventative measures
Measures: 
5% increase in number of managers and
employees trained in Mental Health
Awareness 
0.25 day per fte reduction in sickness
absence levels per annum 
0.25 day per fte reduction in absence
due to mental health and wellbeing
reasons per annum 
5% reduction in costs of absence 
Time taken to manage absence
baselined and monitored for
improvement (reduction)
5% point improvement for relevant
survey results 
Positive anecdotal feedback from trade
unions, managers and workforce 
Mar 2025 H/HR, HRM,
ODM
2
2. Provide support for
reducing incidents
of violence and
aggression in
schools as set out
in the agreed ASN
action plan,
working
collaboratively
with Trades Unions
to identify specific
actions to help
Measures are developed and deployed
that support school-based staff to feel
safe at work and equipped to manage
challenging behaviour appropriately:
Measures developed
Measures deployed 
Measures:
5% reduction in numbers of incidents of
V&A in schools
5% reduction in levels of sickness
absence due to incidents of challenging 
Oct 2024
Jan 2025
HRM/ODM 1
Page 33

Page 34

APPENDIX A 
14 
ACTION REQUIRED PLANNED OUTCOME Completion 
TIME-SCALE
Lead Officer
*Key at end
Priority
Rating 
address short term
absence
behaviour. 
* Lead Officer Key:
H/HR, ICT & OD Head of Human Resources, Information & Communication Technology &
Organisational Development
HRM   Human Resources Manager
ODM   Organisational Development Manager
Page 34

Page 35

REPORT TO: CORPORATE COMMITTEE ON 27 AUGUST 2024 
SUBJECT: INFORMATION GOVERNANCE ANNUAL REPORT 2023/24 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISTIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To provide the Committee with a report on Information Governance activities
within the Council and in particular on improvements made for 2023/24. 
1.2 This report is submitted to Committee in terms of Section III (B) (40) of the
Council's Scheme of Administration relating to ensuring suitable framework is
in place for performance management across the Council. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee considers and notes the current
Information Governance compliance for 2023/24 as set out in the Annual
Report in APPENDIX 1 and summarised in Section 4 below. 
3. BACKGROUND 
3.1 Information Governance covers a range of procedures, policies, guidance and
tools used to support the Council in maintaining compliance with information
legislation and its promotion of good recordkeeping, ensuring that the
Council’s information assets remain secure, relevant and accessible. This
applies to the management of all information, in all formats, which the Council
may collect, create, handle, store, share, erase, process, archive, and
manage in any way. 
3.2 The Information Governance team are responsible for the development,
implementation and monitoring of corporate information governance and
record management strategies, policies and statutory obligations across the
Council, Licensing Board and MIJB. 
3.3 The Information Governance Team comprises of 2.7 FTE posts: Information
Governance Manager and Data Protection Officer (DPO), Information
Governance Officer and Information Co-ordinator. This staffing complement is
small when benchmarked against other local authorities. 
Item 7.
Page 35

Page 36

3.4 The Information Governance Team play a vital role in managing the
information risk of the Council. Whilst some Information Governance issues
are reported through service performance reports it is considered appropriate,
given the organisational risk, for the Council to receive an annual report on
Information Governance. This report is attached as Appendix 1 with
highlights given in Section 4 below: 
4. HIGHLIGHTS FROM ANNUAL INFORMATION GOVERNANCE REPOERT
APRIL 2023 - MARCH 2024 
Data Protection
4.1 To ensure the Council complies with Data Protection obligations; policies,
procedures and guidance for the effective management of personal data are
in place at both corporate and service levels, supported by training and
awareness activities. The Council has Data Sharing or Data Processing
Agreements (DSA/DPA) with external parties, and, Privacy Notices are
published to inform data subjects how their personal data is processed.
Furthermore the Council has a register of Data Protection Impact
Assessments, which are used to identify the data protection risks of a project
or process, as well as a Record of Processing Activities and Information Asset
Register. 
4.2 134 DPIAs were reviewed in 2023/24, with all but 2 approved. 20 new or
updated Privacy Notices have been added to the Council’s website. 23
agreements, such as DSA and DPAs, were signed. 
4.3 All staff within the organisation receive training in data protection and in terms
of our policy all data breaches (situations where personal data has been
mishandled) require to be reported to the Information Governance team. 135
data breaches were reported and internally recorded, 4 more than the
previous year. Lessons are learnt from all breaches reported, in the
anticipation this will avoid more serious breaches. Due to their severity 3
breaches were reported to the regulatory body for data protection, the
Information Commissioner’s Office (ICO), this is an increase from 2022/23’s 2
ICO reported breaches. In these 3 cases the ICO was pleased to hear that the
Council had acted swiftly, limited the harm caused and mitigated potential
risks. The ICO highlighted specific guidance to the Council in order to prevent
further or similar breaches. All 3 cases are closed. 
Records Management
4.4 The Public Records (Scotland) Act 2011 requires the Council to have a
Records Management Plan (RMP). RMPs are resubmitted or updated every 5
years. The most recently submitted RMP is currently being reviewed with
National Records of Scotland (NRS) with a final response expected Summer
2024. NRS’s primary concerns are: 
• Resourcing levels.
• Long term Archival arrangements and resourcing.
• Having an appropriate system for records management across all
council sections. Whilst Microsoft SharePoint fulfils this for a number of
sections it was not rolled out across the whole Council and M365 is not
implemented to the level required.
Page 36

Page 37

4.5 Council closed records are currently split over 3 Closed Records Stores
(CRS). Over 1000 new boxes were accessioned into the stores, whilst
approximately a quarter of that amount were securely destroyed. There have
been discussions with Property Services regarding finding suitable long term
locations for the CRS. 
Access to Information Requests
4.6 1334 Freedom of Information (FOI) and 38 Environmental Information
Requests (EIRs) were received. The majority of these are proactively
published on the Council’s website and stats provided to the Scottish
Information Commissioner’s Office. 95% of FOIs and 89% of EIRs were dealt
with within statutory time limits, a 7% and 8% increase on 2023/24’s response
rates. 
4.7 94 Subject Access Requests (SARs) were received, with 96.9% of these
responded to within the statutory timescales. The ICO is concerned that
Scottish Councils are currently not meeting the statutory timeframes for the
completion of SARs and have been asking for quarterly statistics. Due to the
Council’s improvements (e.g. Q4 2022/23: 80% completed on time vs Q4
2023/24: 100%) the ICO’s demand for quarterly stats has reduced with
statistics now to be submitted every 6 months. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
None 
(b) Policy and Legal
None 
(c) Financial implications
There are no financial implications arising from this report, however the
promotion and implementation of effective information governance
impacts positively on the Council’s ability to mitigate its exposure to
financial risk, particularly monetary penalties levied by the ICO for non-
compliance. For serious breaches of Data Protection the ICO have the
power to issue fines of up to £17.5 million. 
(d) Risk Implications
The Council does not currently have an approved RMP, and, is still
working to ensure complete compliance with Data Protection legislation. 
(e) Staffing Implications
Increased workloads are impacting on the ability of the small team to
respond to additional requests for support from departments. The team
currently prioritise requests and tasks, with statutory obligations taking
highest priority. 
(f) Property
None
Page 37

Page 38

(g) Equalities/Socio Economic Impact
None 
(h) Climate Change and Biodiversity Impacts
None 
(i) Consultations
The Depute Chief Executive (Education, Communities and
Organisational Development), Head of Governance, Strategy and
Performance, Democratic Services Manager and the Council’s
Information Assurance Group have all been consulted and their
comments have been incorporated in the report. 
6. CONCLUSION 
6.1 The Information Governance Report summarises progress made during
2023/24. It shows areas of progress and good performance whilst also
identifying risks and areas for further improvement. 
Author of Report: Alison Morris, Information Governance Manager & DPO
Background Papers: Appendix 1: Annual Information Governance Report 2023-
2024
Ref: 
Page 38

Page 39

REPORT TO: CORPORATE COMMITTEE ON 27 AUGUST 2024 
SUBJECT: TRUST FUNDS – SUMMARY EXPENDITURE FOR 2023/24 AND
ESTIMATED DISPOSABLE INCOME FOR 2024/25 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform Members of the disbursements made from Trusts in 2023/24 and
the estimated disposable income available for disbursement in 2024/25. 
1.2 This report is submitted to Committee in terms of Section III B (16) of the
Council's Scheme of Administration relating to the Management and
Investment of any funds including Common Good and Trust Funds. 
2. RECOMMENDATION 
2.1 The Committee is asked to: 
(i) note the disbursements made from each of the Trust Funds in
2023/24, shown in APPENDIX 1; and 
(ii) agree the estimated income available for disbursement in 2024/25,
shown in APPENDIX 2 
3. BACKGROUND 
3.1 The Council administers 37 trust funds in total, acting as sole trustee for 33
trusts and as one of several trustees for the other four trust funds. The trust
funds represent legacies bestowed by various individuals and organisations
for the benefit of the community or organisations within Moray. 
3.2 Moray Council acts as sole trustee for 8 Connected Charity trust funds which
have charitable status and are registered with the Office of the Scottish
Charity Regulator (OSCR). The Council are one of several trustees for one
other OSCR registered trust fund. The remaining 28 trusts are unregistered
with Moray Council being sole trustee for 25 of these and one of several
trustees for the other three. 
3.3 Since 2013/14, the Registered Charitable Trusts require to be audited by an
external auditor who is appointed by the Accounts Commission, currently
Item 8.
Page 39

Page 40

Grant Thornton.  This only applies to any Charitable Trust for whom the
Council is the sole trustee. Any Charitable Trust for whom the Council is not
the sole trustee requires to be examined by an Independent Examiner; Azets
(previously Scott-Moncrieff) has been appointed as Independent Examiner for
the Auchernack Trust. 
3.4 Policy and Resources Committee on 2 September 2008 (paragraph 11 of the
Minute refers) agreed to only disburse grants from trusts where the disposable
income is greater than £50 and to carry forward undistributed funds each year
until the disposable income reaches £50.  Policy and Resources Committee
on 8 October 2013 (paragraph 8 of the Minute refers) agreed that the whole
annual income of the trust will be made available for disbursement in
accordance with the trust deed (prior to this one third of the income was
reinvested) although the policy not to disburse any Trust Fund with disposable
income under £50 remains. 
4. DISBURSEMENTS IN 2023/24 
4.1 APPENDIX 1 gives details of the disposable income and disbursements made
during 2023/24 from each trust fund. 
4.2 In total, £88,164 was awarded in the year from thirteen of the trust funds.
Disbursements included £58,616 from the Education trusts, Moray & Nairn,
Banffshire, Donald Manson Fund and the Milne’s Institution Trust; £15,920
from the Auchernack trust; £3,791 from The Moray Council Charitable Trust;
£4,177 from the Logie Cottages Trust and £1,584 from The MacDonald
Benevolent Fund. A further £4,076 was awarded from other Trusts. 
4.3 Logie Cottages was sold in 2020, generating a receipt of £102,100.  A loan of
£10,499.56 provided by the Housing Revenue Account (HRA) to cover
essential repairs to the property was repaid, leaving a total sum of £91,600.44
available for Members to distribute.  It was agreed at the meeting of Economic
Growth, Housing and Environmental Sustainability Committee on 1 December
2020 (Paragraph 22 of the Minute refers) that in principle, the money
generated from the sale be used for the attainment of pupils at Forres
Academy whilst respecting the original aims of the Trust as much as
practicable.  The current available balance in reserves at 31 March 2024 is
£85,206 and there is discretion for disbursals from this. 
4.4 In Appendix 2 not all trusts with undisbursed income in 2023/24 have a
balance brought forward in that column, because any undisbursed funds are
added back to reserves and the projected income calculation for the coming
year includes this balance. 
5. 2024/25 DISPOSABLE INCOME 
5.1 APPENDIX 2 shows the estimated disposable income for each trust fund in
2024/25. The estimated income figure is calculated to assist Local Members’
decision making when awarding funds. The figures are only there as a guide.
The total projected funds available for disbursement in 2024/25 is £222,085.
Of this, £2,045 is undisbursed from 2023/24.  There is £6,679 of committed
expenditure; £3,294 from disbursements agreed to be made from the
Page 40

Page 41

Auchernack Trust as agreed at their meeting on 20 May 2024, £2,500 from
the Boyd Anderson Trust and £885 from the MacDonald Benevolent Fund. 
5.2 The reorganisation has reduced the number of trusts that have either nil or
less than £50 disposable income, ensuring that as much income as possible
from the trust funds can be passed on to beneficiaries as efficiently as
possible. There are still some trusts that have loans pool balances invested in
the Council’s Loans Fund, and they earn annual interest on this balance,
however a share of administration costs is also allocated to these trusts and
this then reduces the available income to below the £50 threshold. 
5.3 The interest on balances held in the Council’s bank for 2024/25 has been
calculated using the two year fixed PWLB rate as at 1 April 2024 of 5.41%
(2023/24 2.35%). 
5.4 The estimated administration charge to be allocated over all trusts in 2024/25
is £19,940 (actual 2023/24 £18,990). 
6. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Although there is no direct link to the Moray 2026 Corporate Plan, any
further reorganisation of the Trusts will result in efficiencies within the
Trust funds. 
(b) Policy and Legal
The Council’s adoption of the policy of disbursing the whole annual
income maximises funds available for disbursement. 
(c) Financial implications
In 2023/24 there was £139,897 of funds available for disbursement with
£88,164 disbursed in the year from thirteen of the trust funds, as
identified in APPENDIX 1. 
APPENDIX 2 shows the estimated disposable income for each trust fund
in 2024/25. The total projected funds available for disbursement in
2024/25, plus carry forwards of undisbursed income from 2023/24, is
£222,085 for trusts with available income over the minimum £50 level.
The carry forward from the three trusts in APPENDIX 2 is permitted
through the deeds of the trust, allowing a carry forward of any unspent
funds into the following year. 
The amount committed to date is £6,679 as shown in APPENDIX 2. 
(d) Risk Implications
There is a risk of overspends exceeding disposable income if any
unforeseen emergency major repairs are required for properties owned
by Trust Funds. Close monitoring of costs and the condition of properties
will be undertaken by officers in order to mitigate this risk.  
Page 41

Page 42

(e) Staffing Implications
There are no staffing implications arising from this report. 
(f) Property
The condition of all Trust Fund properties will be monitored in order to
keep reactive repairs to a minimum. 
(g) Equalities/Socio Economic Impact
There are no equalities issues arising directly from this report. 
(h) Climate Change and Biodiversity Impacts
There are no Climate Change or Biodiversity impacts arising from this
report. 
(i) Consultations
Local Members are consulted on discretionary disbursements particular
to their ward. 
7. CONCLUSION 
7.1 Details of disbursements for 2023/24 for each Trust Fund are detailed in
APPENDIX 1 and the estimated income available for disbursement for
each Trust Fund for 2024/25 is shown in APPENDIX 2. 
Author of Report: Audrey Boyd, Accountant
Background Papers: 
Ref: SPMAN-1293228629-1147
Page 42

Page 43

APPENDIX 1
Trust Funds Disbursements 2023/24 APPENDIX 1
Ward TRUST FUND Total Actual
Available for Disbursement
Disbursement
2023/24 2023/24
£ £
All Burial Grounds PERPS 605                       605                      
All JB Mair Fund 834                      
All Burial Grounds TRUSTS 160                       160                      
All The Moray Council Charitable Trust 4,434                    3,791                   
Elgin North Craigmoray Bequest(Bishopmill) 12,834                 
Elgin North John Pringle Bequest 1,299                   
Elgin South/North Laing Mortification 7,465                   
Elgin South/North Young 189                      
Fochabers Lhanbryde Milne's Institution Trust 8,694                    8,694                   
Forres Auchernack 22,093                  15,920                 
Forres Donald Manson (Edinkillie) Fund 11,531                  11,531                 
Forres Donald Manson (Forres Burgh) Fund 2,919                    2,919                   
Forres Logie Cottages, Forres 1,999                    4,177                   
Heldon & Laich Boyd Anderson Trust 664                      
Keith & Cullen Glenisla Comforts Fund 4,602                   
Keith & Cullen William Lawtie 3,383                    1,509                   
Old Banffshire Boundary Banffshire Educational Trust 21,355                  19,671                 
Old Moray Boundary Moray & Nairn Educational 15,123                  15,801                 
Old Moray Boundary The Pringle Trust 2,275                    1,802                   
Public Trust River Lossie 6,883                   
Public Trust Grant Park 951                      
Public Trust Cooper Park 560                      
Speyside Glenlivet The MacDonald Benevolent Fund 6,994                    1,584                   
Speyside Glenlivet Speyside Comforts Fund 2,051                   
TOTAL 139,897                88,164                 
Trusts with Disposable Income under £50
Ward TRUST FUND Total Actual
Available for Disbursement
Disbursement
2023/24 2023/24
£ £
Elgin South/North Young -                            -                           
Elgin Jubilee Cottages -                            -                           
Elgin Ladyhill Cottages -                            -                           
Forres Castlehill Trust -                            -                           
Forres Grant Park Trust -                            -                           
Keith & Cullen Keith Poor Funds -                            -                           
Speyside Glenlivet Dufftown Food -                            -                           
TOTAL -                            -                           
Item 8.
Page 43

Page 44

Page 44

Page 45

APPENDIX 2
Trust Funds Projected Disbursement 2024/25 APPENDIX 2
Ward TRUST FUND Projected Undisbursed Total Committed
Disposable Income Available for Expenditure
Income Disbursement
2024/25 2023/24 2024/25 2024/25
£ £ £ £
All Burial Grounds PERPS 1,471                -                          1,471                    -                      
All JB Mair Fund 1,227                -                          1,227                    -                      
All Burial Grounds TRUSTS 442                   -                          442                       -                      
All The Moray Council Charitable Trust * 12,474              -                          12,474                  -                      
Elgin North Craigmoray Bequest(Bishopmill) 19,765              -                          19,765                  -                      
Elgin North John Pringle Bequest 3,192                1,299                  4,491                    -                      
Elgin South/North Laing Mortification 17,726              -                          17,726                  -                      
Elgin South/North Young * 647                   -                          647                       -                      
Fochabers Lhanbryde Milne's Institution Trust 9,075                -                          9,075                    -                      
Forres Auchernack ** 28,369              -                          28,369                  3,294               
Forres Donald Manson (Edinkillie) Fund 12,307              -                          12,307                  -                      
Forres Donald Manson (Forres Burgh) Fund 3,329                -                          3,329                    -                      
Forres Logie Cottages, Forres 4,578                4,578                    -                      
Heldon & Laich Boyd Anderson Trust * 1,771                -                          1,771                    2,500               
Keith & Cullen Glenisla Comforts Fund 6,552                -                          6,552                    -                      
Keith & Cullen William Lawtie 7,132                -                          7,132                    -                      
Old Banffshire Boundary Banffshire Educational Trust 26,418              1,683                  28,101                  -                      
Old Moray Boundary Moray & Nairn Educational * 17,289              362                     17,651                  -                      
Old Moray Boundary The Pringle Trust 5,397                -                          5,397                    -                      
Public Trust River Lossie 9,005                -                          9,005                    -                      
Public Trust Grant Park 6,040                -                          6,040                    -                      
Public Trust Cooper Park 7,976                -                          7,976                    -                      
Public Trust Forres Squash Courts 684                   -                          684                       -                      
Speyside Glenlivet The MacDonald Benevolent Fund 14,314              -                          14,314                  885                  
Speyside Glenlivet Speyside Comforts Fund 2,860                -                          2,860                    -                      
TOTAL 220,040            3,344                  223,384                6,679               
Trusts with Disposable Income under £50
Ward TRUST FUND Projected Undisbursed Total Committed
Disposable Income Available for Expenditure
Income Disbursement
2023/24 2022/23 2023/24 2023/24
£ £ £ £
Elgin Jubilee Cottages -                        -                          -                            -                      
Elgin Ladyhill Cottages -                        -                          -                            -                      
Forres Castlehill Trust * -                        -                          -                            -                      
Forres Grant Park Trust * -                        -                          -                            -                      
Keith & Cullen Keith Poor Funds * -                        -                          -                            -                      
Speyside Glenlivet Dufftown Food * -                        -                          -                            -                      
TOTAL -                        -                          -                            -                      
*  To be audited by Grant Thornton
** To be audited by Azets
Item 8.
Page 45

Page 46

Page 46

Page 47

REPORT TO: CORPORATE COMMITTEE ON 27 AUGUST 2024 
SUBJECT: CAPITAL PLAN 2024/2025 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT
1.1 To inform the Committee of expenditure to 30 June 2024 under the capital
plan for financial year 2024/25 and of estimates of projected expenditure
profiled into quarters. 
1.2 This report is submitted to committee in terms of Section III (B) (9) of the
Council’s Scheme of Administration relating to the formulation, implementation
and review of asset management policies and practices, and to the
maintenance of an overview of the Council’s property disposal programme. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee: 
(i) considers and notes expenditure to 30 June 2024 of £3,342,000, as
set out in APPENDIX 1; 
(ii) considers and notes the projected overall expenditure for projects
spanning more than one financial year, as set out in APPENDIX 2;  
(iii) approves further amendments of £3,047,000 for 2024/25 and
£110,000 for 2025/26 to the capital plan as detailed in section 5;
and; 
(iv) considers and notes progress on the review of surplus assets
following an update to various refugee and resettlement
programmes. 
3. BACKGROUND 
3.1 The capital plan for 2024/25 totalling £49,962,000 was approved by Moray
Council on 24 January 2024 (paragraph 11 of the Minute refers). The Council
approved carried forward budget and reprofiling amendments to future years
of £13,638,000 on 26 June 2024 (paragraph 13 of the Minute refers). The
Item 9.
Page 47

Page 48

results of these amendments are a total capital plan for 2024/25 of
£37,132,000. 
3.2 The 2024/25 Capital Plan includes a £9,000,000 slippage factor, a reduction
in budget of roughly 15%. This is a precursor to an overall capital spend cap
which will be introduced into future capital plans. 
4. CAPITAL PLAN 2024/2025 
4.1 A copy of the summary capital plan is included as APPENDIX 1 showing
actual expenditure to 30 June 2024 of £3,325,000. This is 9% of the currently
approved Capital Plan. Spend has been offset by income from General
Capital Grant of £1,836,000 from the Scottish Government; Developer
Contributions of £617,000; and other grants and contributions of £108,000.
The balance of spend is to be covered by external borrowing. 
4.2 Expenditure on land and buildings to 30 June 2024 totals £698,000. Spend of
£398,000 was attributable to the learning estate with the majority being
through the BB Programme. A further £263,000 was spent on delivering grant
funded economic development projects – Just Transition Fund (£170,000),
Nature Restoration Fund (£51,000) and Town Centre Improvement Fund
(£40,000). The balance of £37,000 was for other various projects, none of
which exceeded £25,000.   
4.3 Expenditure on infrastructure assets to 30 June 2024 totals £2,218,000. The
most notable expenditure was incurred against harbours (£1,662,000) with
£1,164,000 associated with works at Buckie Harbour for rock cutting. Other
expenditure was Roads (£226,000); Flood Risk Management & Coastal
Protection (£170,000); Street Lighting (£134,000); and Bridges (£25,000). 
4.4 Expenditure on vehicles, plant and equipment to 30 June 2024 totals
£340,000. The main item of expenditure was £268,000 on the Vehicle & Plant
Replacement Programme with the balance associated with ICT spend
(£42,000) and other various projects, none of which exceeded £25,000. 
4.5 Expenditure associated with the Moray Growth Deal to 30 June 2024 totals
£78,000, the majority of this associated with the Cultural Quarter (£56,000)
with the remainder for Bus Revolution (£14,000) and EY Stem (£8,000).   
5. CAPITAL PLAN AMENDMENTS 
5.1 At a special meeting of the Council on 27 March 2024 (paragraph 6 of the
Minute refers) it was agreed a further £2,737,000 of capital funding would be
made available to fully fund the design and construction of the replacement
Cloddach bridge. Although this agreement is contingent on funding from UK
Government being given final approval it is recommended this commitment is
added to the capital plan for 2024/25 to ensure full visibility. 
5.2 Additional grant monies of £300,000 have been received from Scottish
Government for Coastal Change Adaption case studies, following a
successful bid for funding. It is recommended the monies and associated
spend are added to the capital plan for 2024/25
Page 48

Page 49

5.3 £122,000 has been received from Scottish Government for the 2024/25
allocation of the Nature Restoration Fund. It is estimated £10,000 of the grant
will be spent in 2024/25 with the remaining £110,000 being carried forward
into next financial year and recommended that the capital plan for each year is
amended accordingly. 
5.4 In total, amendments of £3,047,000 for 2024/25 and £110,000 for 2025/26 are
being recommended for addition to the capital plan. 
6. EMERGING ISSUES 
6.1 Following a meeting of the Council on 22 May 2024 where an update was
provided on the various schemes to support refugees (paragraph 15 of the
Minute refers) it was acknowledged that a number of properties provisionally
set aside for these schemes were no longer required. Following a review of
these properties (5no. in total) one property has been leased to the Housing
Revenue Accounts (HRA) and three properties have been declared surplus,
following the Council’s process for declaring properties surplus to operational
requirements, with a view to marketing these for sale. The remaining property
had already been sold in June.  Any receipts received will be used to fund
future capital spend. 
7. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) 
Effective budget management is an essential component of delivery of
Council priorities on a sustainable basis. 
(b) Policy and Legal
There are no policy or legal implications arising directly from this report. 
(c) Financial implications
The financial implications are highlighted within the report and
APPENDICES 1 and 2 to the report. 
(d) Risk Implications
Budget managers are aware of their responsibilities for managing budget
allocations and approval for variance will be sought from Council in line
with the financial regulations. 
(e) Staffing Implications
There are no staffing implications arising directly from this report. 
(f) Property
There are no property implications arising directly from this report. 
(g) Equalities/Socio Economic Impact
There are no equalities issues arising from this report
Page 49

Page 50

(h) Climate Change and Biodiversity Impacts
There are no climate change or biodiversity issues directly arising from
this report. 
(i) Consultations
All capital budget managers have been consulted as part of the
preparation of this report. All Heads of Service and the Corporate
Management Team have been consulted and any comments
incorporated in the report. 
8. CONCLUSION 
8.1 Capital expenditure to the quarter ended 30 June 2024 was £3,342,000. 
8.2 Amendments to the capital plan of £3,047,000 for 2024/25 and £110,000
for 2025/26. 
Author of Report:  Jamie Fraser, Senior Accountant 
Background Papers: 
Ref: SPMAN-1293228629-1124 
Page 50

Page 51

Moray Council Capital Programme 2024/25
As at 30 June 2024
Appendix 1
Original
Capital Plan
2024/25 Actual Q1 Q2 Q3 Q4
Total Projected
Expenditure
(Over) /
Underspend
£000 £000 £000 £000 £000 £000 £000 £000
Land and Buildings
Education, Children's and Leisure Services Committee 35,999 400 400 3,373 2,364 8,883 15,015 0
Economic Development and Infrastructure Committee 1,392 290 290 597 480 4,536 5,903 0
Corporate Committee 0 0 0 3,373 2,364 8,883 0 0
Infrastructure
Economic Development and Infrastructure Committee 7,586 2,217 2,217 4,402 4,034 8,468 10,555 -468
Vehicles Plant and Equipment
Education, Children's and Leisure Services Committee 220 2 2 0 0 0 263 0
Economic Development and Infrastructure Committee 3,433 296 296 0 0 0 4,296 0
Corporate Committee 1,032 42 42 131 150 249 1,203 0
Moray Growth Deal 0 78 78 2,925 2,001 5,038 10,042 0
49,662 3,325 3,326 14,801 11,393 36,057 47,277 -468
Target
Funding
Prudential Borrowing 41,102 601 35,994
General Capital Grant (exc PSHG and CYPA) 7,959 1,836 9,795
Moray Growth Deal 0 0 0
Other Grants & Contributions 411 271 682
Developers Contributions 35 617 652
Useable capital receipts b/f 0 0 0
Receipts generated in year 155 0 155
49,662 3,325 47,277
Item 9.
Page 51

Page 52

Page 52

Page 53

Major Capital Projects spanning more than 1 financial years (as at 30th June 2024) Appendix 2
Approved
budget
Total
Expenditure in
previous years
Current
budget    24-
25
Actual
spend   24-
25
Remaining
budget     24-
25
Projected
future years
budget
required
Estimated
Final Cost
Projected
Variance
£000 £000 £000 £000 £000 £000 £000 £000
Schools Estate
BB Programme           91,500                    3,999               4,780              315 4,465             82,721                        91,500                        -
Refurbishment and Rebuild       289,684                         527               4,184                 33 4,151             284,973                   289,684                        -
Universal school meals                 654                               -                   619                     - 619                 35                                         654                        - 
Moray Growth Deal
Bus Revolution 4,000           1,015                  997                -                  997                 1,988               4,000                                     -
Early Years STEM 4,800           66                         2,077            -                  2,077             2,657               4,800                                     -
Housing Mix Delivery 7,500           1,385                  -                       -                  -                        6,115               7,500                                     -
Cultural Quarter 23,802        458                      2,340            2,340             21,004            23,802                                  -
Business Enterprise Hub 5,000           -                             1,550            2                 1,548             3,450               5,000                                     -
Moray Aerospace, Advanced technology and
Innovation Campus 27,035        -                             1,032            1                 1,031             26,003            27,035                                  -
Manufacturing Innovation Centre 6,832           -                             1,920            -                  1,920             4,912               6,832                                     -
Digital Health Innitiative 5,000           3,185                  126                0                 126                 1,689               5,000                                     -
TOTAL 465,807     10,635               19,625         351            19,274          435,547         465,807                               -
Notes:
School Estate Budget is indicitive based on 10 year plan submitted 24 January 2024
Item 9.
Page 53

Page 54

Page 54

Page 55

REPORT TO:   CORPORATE COMMITTEE ON 27 AUGUST 2024 
SUBJECT: REVENUE BUDGET MONITORING TO 30 JUNE 2024 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To advise Committee of the revenue budget monitoring position to 30 June
2024. 
1.2 This report is submitted to Council in terms of Section III B (10) of the
Council's Administrative Scheme relating to monitoring current revenue
expenditure against approved budget.
.
2. RECOMMENDATION 
2.1 It is recommended that Committee considers and notes:  
(i) the budget monitoring position of £2,263,000 under budget for
2024/25 as at 30 June 2024; 
(ii) that this position consists of an underspend on Devolved School
budgets within Education of £369,000, an underspend of £917,000
on Environmental and Commercial Services, an underspend on
Social Care services and Children’s Services delivered on behalf of
the Moray Integration Joint Board (MIJB) of £1,375,000 and
£103,000 respectively, and overspends in other services of
£419,000; 
(iii) an increase of £1,038,000 in the General Revenue Grant, as detailed
in paragraph 3.5; 
(iv) the emerging budget pressures noted in section 6 for the school
catering Fusion app; 
2.2 It is recommended that the Council approves: 
(i) the use of the working ear-marked reserve of £13,000 as detailed in
paragraphs 6.1 to 6.2. 
Item 10.
Page 55

Page 56

3. BACKGROUND 
3.1 When the revenue budget for 2024/25 was approved by Moray Council on 28
February 2024 (paragraph 7 of the minute refers), General Revenue Grant of
£215,396,000 was estimated for the year, based on the latest amount notified
to the Council and included an increase of £9,167,000 for the transfer of Early
Learning and Childcare from specific grant, as well as estimates for further
distributions of grant expected during the year. Council Tax receipts of
£51,375,000 were anticipated. Budgeted expenditure of £278,794,000 was
agreed, and this required projected use of £12,023,000 of the Council’s Ear
Marked Reserves to balance the budget.   
3.2 In addition to the Council’s core budget, monies allocated to schools through
the Devolved School Management (DSM) scheme and not spent are brought
forward from previous years. The DSM balance brought forward in 2024/25 is
£753,000 (2023/24 £853,000). Unused Pupil Equity Fund of £677,000
received in 2023/24 and £76,000 funding for nursery snacks and fundraising
have been carried forward into 2024/25 in accordance with the grant
conditions. 
3.3 During 2023/24 year end £3,485,000 was transferred to other earmarked
reserves to preserve funding for specific projects (including Refugee
Resettlement, Whole Family Wellbeing Fund, Employability, Levelling Up). 
3.4 On 26 June 2024 Council approved additional expenditure of £192,000 to be
funded from the working ear-marked reserve. £77,000 of these adjustments
have been posted to departments during quarter 1. 
3.5 Additional General Revenue Grant (GRG) of £1.038million was confirmed by
the Scottish Government in May 2024 as the Council’s share of additional
GRG totalling £62.7million across Scottish Council’s. The funding will be
baselined for future years. Further redeterminations of funding have since
been announced and will be reflected in the quarter 2 monitoring. 
3.6 Reconciliation of the movements in the base budget from that which was
approved by the Moray Council on 28 February 2024 is shown in APPENDIX
2 and allocations to departments from the provisions for Inflation and
Contingencies, Additional Costs and Savings are listed in APPENDIX 3. 
4. BUDGET POSITION 
4.1 APPENDIX 1 summarises the current position for each service area,
comparing the actual expenditure with the budget to 30 June 2024. 
4.2 Overall the budget position at 30 June 2024 is expenditure under budget to
date of £2,263,000, 3% of budget to date, including services delivered on
behalf of the Moray Integrated Joint Board.   
4.3 The principal areas of overspend and underspend across the Council are
summarised below. 
4.4 Education has a £215,000 under spend to date. Devolved School budgets are
underspent by £369,000 at the end of the first quarter; £131,000 in primary
Page 56

Page 57

schools and £238,000 secondary schools. There is flexibility in DSM budgets
to allow for planning for the sessions ahead and where spend is planned on
the academic year. Schools and Curriculum Development has a £170,00 over
spend to date on central supply costs (maternity and long term sickness
cover). Out of Area is over spent by £26,000 as a young person placement
has being extended. There are other minor variances, both over and under
spends, within central Education budgets. 
4.5 Environmental and Commercial Services are reporting a £917,000
underspend to date:   
Roads Maintenance 
There is a net underspend of £741,000 within Roads Maintenance revenue
budget. The bulk of the revenue maintenance budget is allocated to items
such as carriageway repairs/footway repairs/gully cleaning/grass cutting and
ditching maintenance and currently totals £305,000 from an available budget
of £2,000,000. The spend to date is mainly attributed to reactive small
carriageway patching repairs. The actual works completed and works
committed, (i.e works identified and waiting to have repairs scheduled and
undertaken) currently totals £1,400,000. It is forecast with high confidence that
this revenue maintenance budget will be fully spent at end of financial year.
This revenue budget also includes the income recharged from carrying out 
the approved capital maintenance programme. This year has been a
challenging programme to complete due to a number of factors, including
wintry weather in early Spring which resulted in a delay to the pre patching of
roads, which in turn led to the start of the programme being delayed by 3
weeks. In addition, some unplanned plant breakdowns has resulted in delays
to the on site operations. 
Fleet Services 
Internal recharges are higher than budget by £281,000 due to variations in
vehicle hire charges to user departments. Offsetting variances will be reflected
in departments budgets (mainly within Environmental and Commercial
Services, and Building Services) and budgets are currently being reviewed in
order to be updated for next month. 
Building Cleaning and Catering 
Underspends on food costs of £36,000 and £7,000 on free sanitary products
to date. 
Parks and Countryside 
Lands and Parks operational budget is £38,000 underspent including
materials and income surplus for recharges to departments and overspends
on vehicle hire charges. Burial Grounds has an income shortfall of £55,000 to
date on interment fees and sale of lairs. 
Waste Management
Waste has a £138,000 shortfall in Green Waste permit income to date. Sale of
wheeled bins and wastepaper income is above budget. 
Traffic and Transportation
An overspend of £41,000 to date is primarily due to shortfall in income across
services; car park income £16,000 and Harbours £24,000. An upgrade of 25
Page 57

Page 58

car park machines to 4g was a one off additional expense of £17,000 and is
listed as a budget pressure below (para 6.4). 
4.6 General Services Housing and Property is over spent by £33,000 in total with
over and under variances; overspends on corporate buildings repairs and
maintenance of £119,000 and schools repairs and maintenance £93,000.
Underspends within Homeless temporary accommodation £49,000 and a
surplus of Industrial Estate rental income £121,000. 
4.7 HR, ICT and Organisation Development is presenting a £53,000 overspend,
attributable to ICT hardware and software costs. There is provision in Inflation
for contract increases which can fund this contract uplift if required. 
4.8 Financial Services is showing a £16,000 overspend. One off fees and
expenses within Taxation of £15,000 and postages £33,000 over budget with
an underspend to date on the small-scale service development budget (which
is yet to be allocated to projects) of £25,000. 
4.9 Governance, Strategy and Performance have an overspend of £10,000 which
is made up of several variances; overspends on Housing Benefits £40,000
and Discretionary Housing Payments £57,000 along with software costs
£21,000 higher than budget. Underspends in Civic Licensing fee income of
£82,000 mainly from Short Term Lets and Central Postages £23,000. 
4.10 Other expenditure is over budget to date by £307,000 including £41,000 for
supernumeracy and voluntary redundancy payments which will be funded
from Council Priorities reserve. Additional pension costs were £230,000
(including Strain on the Fund). 
4.11 Health & Social Care is reporting an underspend across services during
quarter 1 of £1,375,000. The figures included in this report relate purely to the
services delivered by Moray Council on behalf of the MIJB. Overspends on
budgets include Learning Disability purchasing £552,000, Occupational
Therapy equipment £130,000, OP/PSD purchasing £564,000, contracts
£35,000 and Drug & Alcohol budgets £4,000. Underspends within Provider
services staffing (Care at Home, Day Services and Complex Challenging
behaviour) of £502,000, Mental Health £71,000, Integration Fund £14,000 and
Strategy and Support budgets £17,000. There are savings identified of
£1,300,000 and unallocated funds for New Burdens of £720,000 included in
the budget. 
4.12 In Children’s Services, there is an underspend of £103,000.  Placement
Services have an underspend of £77,000 for adoption and fostering
fees/allowances, throughcare/aftercare payments and adoption fees to other
local authorities. Within Area Teams there is a £29,000 under spend on
SDS/direct payments and home to school transport. 
4.13  Income budgets across the Council are showing both positive and negative
variances and the main variances have been identified in paragraphs 4.1 –
4.10 above.    
Page 58

Page 59

4.14  The position is summarised in the table below: 
Overspend 
£000s
Underspend 
£000s
Net
variance
£000s
DSM  369 
Central supply teachers (170)  
Roads maintenance  741 
Other Environmental &
Commercial services 
176 
Property repairs & maintenance (212)  
Estates rental income  121 
Cost of early retirement (230)  
Other Council services (net) (10)  
MIJB  1,478 
TOTAL  (622)  2,885  2,263 
5. BUDGET PRESSURES & ADDITIONS 
5.1 Budget pressures recognised when the budget was approved on 28 February
2024 are released when the pressure crystallises to the extent that it can be
accurately quantified.  Provisions to meet budget pressures and new duties
totalling £2,639,000 have been released in quarter 1 and these are itemised in
APPENDIX 3. 
5.2 Provisions still held centrally at the end of quarter 1 total £9,305,000 and are
detailed in APPENDIX 4 and given a RAG assessment for likelihood of
requirement.   
5.3 One provision is assessed as red, as no longer being required; £30,000 for
the Deposit Return Scheme was confirmed in Scottish Parliament to be
delayed until October 2025 and this provision will be carried forward into
2025/26. 
5.4 Balance of provisions totalling £9,278,000 are assessed as amber, for
uncertainty of requirement. These include the school roll numbers which will
be drawn down when the new academic year rolls are known in
September/October. The balance of £401,000 for ASN Improvement
Modernisation Plan provision requires no further funding in the year. Increase
in loans charges of £800,000 will be assessed during quarter 2 when looking
at Treasury forecasts. Budget provisions for NDR liabilities (£290,000) and
Energy Costs £635,000 have not been calculated but will be reviewed and
drawn down what is needed. The budget pressure identified at budget setting
of £5,000,000 for the Council’s share of a potential MIJB overspend is
unknown at this stage and will be closely monitored and reported. 
5.5 Seven provisions are classed as green and have been drawn down in full. The 
increase in Employers contribution to Teacher’s Pensions was slightly over
the amount budgeted. 
5.6 All other provisions are expected to be required in full at this juncture. 
Page 59

Page 60

6. EMERGING BUDGET PRESSURES 
6.1 Emerging budget pressures are noted throughout the year as they are
identified.  There are three new budget pressures quantified during quarter 1
and explained below. 
6.2 The 8 secondary schools have had a cashless catering system in place called
Impact for approximately 18 years. The system is for approximately 5,600
secondary pupils and 1,500 educational staff to pay for food without using
cash.  Parents/Teachers can top up online or the pupils can top up by cash at
the school. The current cashless catering software, Impact, now has a short
shelf life as the system will no longer be supported from end of 2024. There is
also a pre order app from Fusion that was adapted to work within Impact. An
upgrade to Fusion will provide a system that will not only interface with the
current Ipay system but also the Nutmeg system.  (Nutmeg is the nutritional
analysis system and labelling system for Natasha’s law that is used by the
Catering department.) Additional on-going revenue funding, and one-off
capital funding, will be required to transition to Fusion, however the upgrade
will allow the Council to react to service changes in a much more timely
manner. The Catering service had approval from the Asset Management
Working Group to upgrade the Fusion app for school meals this year at a cost
of £13,000. The recurring increase in annual licence fee as a result of the
upgrade is reported as a budget pressure. 
7. SAVINGS 
7.1 Savings and increased charges of £9,370,000 were approved when the
budget was set.  These savings comprised one-off savings of £112,000 and
other permanent savings of £8,916,000. The increase in charges per the
budget paper was £342,000. 
7.2 In addition to the savings approved when the budget was set, additional
savings/income of £1,216,000 were carried forward from 2023/24 to be
actioned in the current year. Further recurring savings/additional income of
£225,000 were approved at Moray Council on 26 June 2024; £75,000 leisure
services income and £150,000 energy costs saving (para 14 of the minute
refers). These are included on APPENDIX 5. 
7.3 Of the original approved savings, a balance of £1,871,000 remains in central
provisions as at the end of June. These are detailed in APPENDIX 5 and
given a RAG assessment for anticipated achievement. The balance consists
of savings not yet posted to services (£2,172,000) less additional savings
found in year (£301,000). 
7.5 Twenty nine savings with a balance of £3,978,000 are assessed as amber at
this stage. Several savings within Environmental and Commercial Services
have been delayed and their positions being confirmed. The hiring out of
Roads Maintenance machinery is progressing, with orders for plant and
vehicles made to suppliers but given lead times delivery is expected to be into
the 2025 calendar year. The implementation for the reduction in Building
Cleaning across the HQ campus buildings has begun and savings are due to
be achieved from 1 August 2024. Savings in Parks and Open Spaces have
yet to be taken from departmental budgets for the uplift in burial charges to full
Page 60

Page 61

cost recovery and recharge for the maintenance of Common Good/Trust land
and parks. Fleet have identified externally leased vehicles that can be ended
and therefore reduce costs as user departments will share existing
vehicles/plant. When vehicles have been collected, savings will then be
generated and processed. The Dallachy closure saving is currently also
classed as amber at this point while the budget is being reviewed now the
NESS Energy from Waste facility is fully operational. The approved saving
from the Elgin Community Centre closure will not be fully achieved until the
building is sold. A one off saving of £73,000 is anticipated to accrue from the
refund due from Grampian Valuation Joint Board, the amount of which will be
confirmed when the accounts for 2023/24 are audited and approved by the
Board – the saving will be posted thereafter. 
7.6 Corporate savings including the vacancy factor saving is also amber. Until a
pay deal has been agreed the saving, arising as a result of budgeting at top of
scale, cannot be quantified. 
7.7 Other savings assessed as amber were carried forward from last year to be
processed and include the PPP Service Concession, which will be calculated
for 2024/25 and processed in the next quarter. £30,000 from the use of
purchasing cards across services to ensure that VAT receipts are submitted
per financial regulations and therefore all input VAT reclaimed is classed as
amber but recent developments in the purchasing card system, requiring
documentation to be scanned in for all purchases, are envisaged to assist in
achieving this saving.
. 
7.8 Savings assessed as green total £8,445,000 and have been processed this
year to date, compared to £6,282,000 that was approved for these ones only.
The estimated saving for the decrease in the Employers pension contributions
to the North East Scotland Pension Fund (NESPF) for SJC employees was
based on an original rate reduction from 19.3% to 16.4%. The actual
contribution rate from 1 April 2024 reduced to 14.3%, which has given
£1,896,000 more savings than estimated. Other savings that have come
about since budget setting total £293,000, and are assessed as green;
Schools energy £150,000, Early Years STEM £58,000, ELC Change
Management Plan £62,000 and Auchernack closure savings £23,000. 
8. RESERVES 
8.1 The Council needs to retain a certain amount of free reserves in case of
unforeseen contingencies or emergencies. The balance on free general
reserves (ie excluding DSM and ear-marked reserves) as at 1 April 2024 was
£6,000,000, following approval in the 2024/25 budget setting paper to
increase it by £1,000,000 (paragraph 5 of the Minute refers). This brings the
balance in free general reserves up to 2% of the revenue budget for 2024/25.
The level will be assessed when the Reserves Policy falls due for renewal in
September 2024. 
8.2 APPENDIX 6 itemises the movements on reserves during the year to date
and gives the free balance on the reserves at 30 June 2024. The working
reserve had a balance of £8,686,000 on 1 April (£8,721,000 reported to Moray
Council on 26 June which was reduced by a DSM adjustment of £35,000) and
has a commitment to balance the 2024/25 budget. Moray Council on 26 June
2024 approved an additional use of working ear marked reserves totalling
Page 61

Page 62

£192,000, as detailed in paragraph 3.4 (paragraph 14 of the Minute refers). A
balance of £2,765,000 remains available for use. 
8.3 Earmarked reserves for project slippages are held to keep track of funding for
projects where reserves balances have built up and need to be drawn down
as and when the expenditure is incurred. These include: Refugee resettlement
funding, Education Attainment Fund, Whole Family Wellbeing Fund,
Employability, Dorenell Windfarm fund, Sanquhar Loch. The current balance
of these is £5,073,000. This excludes DSM reserve. 
8.3 Balances at 30 June 2024 for other ear marked reserves include £5,421,000
for Transformation, £3,134,000 for Council priorities and £4,000,000 for Moray
Growth Deal cash flow funding and £7,526,000 for the newly created reserve
at 2023/24 closedown for the PPP Service Concession. 
9. SUMMARY OF IMPLICATIONS 
(a) Moray 2026: A Plan for the Future and Moray Corporate Plan
Effective budget management is an essential component of delivery of
council priorities on a sustainable basis. 
(b) Policy and Legal
No policy or legal implications arise directly from the contents of this
report. 
(c) Financial implications 
The financial implications are addressed throughout the report. 
(d) Risk Implications
There are no risk implications arising directly from this report.  Budget
managers are aware of their responsibilities for managing their budgets
in accordance with the Council’s Financial Regulations.  There is a risk
to the Council arising from the agreement that if the Moray Integrated
Joint Board overspends the Council will meet their share of the
additional costs incurred. The Council’s share was 37% but will
increase due to Childrens and Justice Services being fully integrated
this year, the revised % is being recalculated. Changing inflation rates
present a risk to the Council’s budget; CPI inflation stayed at the 2%
target in June but the Bank expects this to rise to 2.75% in the second
half of this year. 
(e)  Staffing Implications  
No staffing implications arise directly from this report. 
(f)   Property  
No property implications arise directly from this report. 
(g) Equalities/Socio Economic Impact
No equalities implications arise directly from this report. 
(h) Climate Change and Biodiversity Impacts
No climate change and biodiversity impacts arise directly from this
report.
Page 62

Page 63

(i) Consultations
Consultation concerning Revenue Budget Monitoring is an on-going
process with budget managers across the Council.  CMT and Heads of
Service have also been consulted in the preparation of this report and
any comments incorporated. 
10. CONCLUSION 
10.1 The financial position of the Council at the end of June 2024 is an
underspend against General Services Revenue Budget of £2,263,000
(including services delivered on behalf of the Moray Integration Joint
Board).   
10.2 Variations in General Revenue Grant totalling £1,038,000 have been
notified to the council. 
10.3 There is one additional budget pressure noted at quarter 1, totalling
£13,000. If approved this will be funded from working ear-marked
reserves. 
Author of Report: Susan Souter, Senior Accountant 
Background Papers: Held by author  
Ref:     SPMAN-1293228629-1131 
Page 63

Page 64

Page 64

Page 65

APPENDIX 1
MORAY COUNCIL - APPENDIX 1
BUDGET MONITORING REPORT
QUARTER 1 to 30 JUNE 2024
Service
Revised Budget
2024/25
£000s
Budget to 30 June
2024
£000
Actual &
Committed to
30 June 2024
£000s
Year to date
variance
£000s
Education, Resources & Community 13,040 3,867 3,858 9
Education 113,531 27,914 27,699 215
General Services Housing & Property 4,207 972 1,005 (33)
Environmental & Commercial Services 28,238 7,019 6,102 917
Economic Growth & Development Services 3,398 1,118 1,098 20
HR, ICT & Organisational Development 5,729 2,209 2,262 (53)
Financial Services 1,639 753 769 (16)
Governance, Strategy & Perfomance 5,697 2,605 2,615 (10)
Other Services 2,534 657 964 (307)
SERVICES excl HEALTH & SOCIAL CARE 178,013 47,114 46,372 742
Health & Social Care (IJB) 60,832 16,048 14,673 1,375
Health & Social Care (Non IJB) 546 136 93 43
Childrens Services (IJB) 15,863 5,172 5,069 103
TOTAL SERVICES incl HEALTH & SOCIAL CARE 255,254 68,470 66,207 2,263
Loans Charges 16,407 0 0 0
Provision for Contingencies and Inflation 2,105 0 0 0
Additional Costs 9,305 0 0 0
Unallocated Savings (1,871) 0 0 0
TOTAL PROVISIONS 9,539 0 0 0
TOTAL GENERAL SERVICES EXPENDITURE 281,200 68,470 66,207 2,263
Commentary on Quarter 1 Performance
Environmental & Commercial Services:
The largest variance in the Service, Roads Maintenance spend to date is maintly attributed to reactive small
carriageway patching repairs. An underspend on recharges to capital is due to a number of factors, including
adverse weather conditions in Spring, and plant breakdowns, causing delays. The programme of works are
committed for the year.
Education
Devolved School Budgets comprise £369k of the underspent (Primary £131k and Secondary 238k) but there is
flexibility in these budgets where spend is planned on the academic year. Schools and Curriculum Development
is overspent on central supply costs due to staffing cover.
Children's Services
Underspends across the areas of Children's Services including Placement Services for adoption and fostering fees/
allowances, throughcare/aftercare payments and adoption fees to other local authorities. Area Teams also have
underspends, in SDS/direct payments and home to school transport.
5.6%
7.6%
40.8%
1.4%
10.3%
1.6%
3.2%
1.1%
3.8%
1.0% 23.4%
0.2%
Budget YTD
% of Total
Education, Resources & Community Childrens Services Education
General Services Housing & Property Environmental & Commercial Services Economic Growth & Development Services
HR, ICT & Organisational Development Financial Services Governance, Strategy & Perfomance
Other Services Health & Social Care (IJB) Health & Social Care (Non IJB)
5.8%
7.7%
41.8%
1.5%
9.2%
1.7%
3.4%
1.2%
3.9%
1.5% 22.2%Actual YTD
% of Total
Education, Resources & Community Childrens Services Education
General Services Housing & Property Environmental & Commercial Services Economic Growth & Development Services
HR, ICT & Organisational Development Financial Services Governance, Strategy & Perfomance
Other Services Health & Social Care (IJB)
(400)
(200)
0
200
400
600
800
1,000
1,200
1,400
1,600
£000's
YTD Actual Variance to Budget (excl Loans & Provisions)
Education, Resources & Community Childrens Services
Education General Services Housing & Property
Environmental & Commercial Services Economic Growth & Development Services
HR, ICT & Organisational Development Financial Services
Governance, Strategy & Perfomance Other Services
Health & Social Care (IJB)
Item 10.
Page 65

Page 66

Page 66

Page 67

Allocated
Budget
Provisions for
Contingencies
and Inflation
Additional
costs
Savings Budget Loan
Charges
Depreciation Total
Budget
£000s £000s £000s £000s £000s £000s £000s £000s
MC 28 Feb 2024 256,525 4,504 11,944 (10,586) 262,387 16,407 278,794
School carry forwards 753 753 753
PEF/SEF carry forwards 840 840 840
ELC carry forwards 34 34 34
Funded from reserves - approved MC 28/06/23 0 0
Funded from Transformation Earmarked Reserve (43) (43) -43
Funded from Other Earmarked Reserves 822 822 822
Adjustment 1 - release to departments (3,677) (2,399) (2,639) 8,715 0 0
Corporate Committee 26/8/24 255,254 2,105 9,305 (1,871) 264,793 16,407 0 281,200
APPENDIX 2
Item 10.
Page 67

Page 68

Page 68

Page 69

ALLOCATIONS FROM PROVISIONS
Provision for Contingencies and Inflation Committee
reference
£000s £000s
Approved when budget set: MC 28/2/24 4,327
Provisions c/fwd from 23/24 177
Pay Awards - Teachers (1,017)
Regrading appeal (632)
Pay - Other (13)
Contract increases (288)
School/Community Transport (178)
Apprenticeship Levy adj (128)
Audit fee (17)
Other inflationary increases (15)
Members Allowances (51)
Moray Leisure Centre (Contingency) (49)
Other releases from Contingency (11)
(2,399)
Balance at 30 June 2024 2,105
Additional Costs Committee
reference
£000s £000s
Approved when budget set: MC 28/2/24 11,907
Budget pressures approved when budget set
Budget pressures c/fwd from 23/24 37
NDR Revaluation (23)
School roll numbers 10
Teacher's Pension increase from 23% to 26% (wef 1 April 2024) (1,517)
Raising Attainment (IMP) (195)
ASN (balance of permanent £0.7m) MC 28/6/23 (434)
ASN (balance of temporary £1.1m) MC 28/6/23 (325)
ICT Software subscription (36)
Additonal Funding to the Scottish Welfare Fund - one year
only
(40)
(2,560)
Additional funding allocated
Expansion of Universal Free School Meals (79)
(79)
Balance at 30 June 2024 9,305
Savings & Charges Committee
reference
£000s £000s
Approved when budget set: MC 28/2/24 (9,370)
Savings c/fwd from 23/24 (1,216)
Environmental & Commercial Services savings 889
Economic Growth and Development savings 292
Housing and Property 402
Education 656
Education Resources and Communities 443
APPENDIX 3 Item 10.
Page 69

Page 70

Governance, Strategy and Performance 127
HR, ICT & Organisational Development 106
Financial Services 397
Childrens Services 454
Cross Service:
NESPF pension fund rate from 19.3% to 14.3% 4,456
Indicative Savings from I&M programme:
Care placements 245
Temporary Savings:
LHEES Savings 50
Income target per budget paper 198
8,715
Balance at 30 June 2024 (1,871)
Page 70

Page 71

APPENDIX 4
BUDGET PRESSURES
Ref Description Para
Ref
Original Amount Drawn Down Balance Status Comments
RECOGNISED WHEN BUDGET SET £000 £000 £000
2023/24 opening position adj
NDR Revaluation 37 23 14 Balance not required
Education
School Roll numbers 243 (10) 253 Budget will be drawn after new
academic years roll is known in
Sept/Oct
Teacher's Pension increase from 23% to 26% (wef 1 April
2024)
1,500 1,517 (17)
Economic Growth & Development
MGD revenue contribution STEM 62 0 62
Environmental & Commercial
Deposit Return Scheme 30 0 30 Scheme postponed until Oct 25
HR, ICT & Organisational Development
ICT Software subscription 36 36 0
Other
Uprating Personal & Nursing Care (share of £1.5m) 80 80
Additonal Funding to the Scottish Welfare Fund - one year
only
40 40 0
Cross Service
Revised IMP 596 195 401 ASN IMP requires no further
funding.
Increase in Loans Charges 800 800
NDR Liabilities increase in Uniform Business Rates (UBR) 290 290 Impact not yet calculated but likely
to be required in full
Electricity/Gas increase 635 635 Impact not yet calculated but likely
to be required in full
Trade Union Facility time 57 57 Full amount not required, only
requirement for the Education TU
ASN - MC 28/6/23 perm £0.7m 434 434 0
ASN - MC 28/6/23  temp £1.1m 325 325 0
MIJB Share of core overspend 5,000 0 5,000
Total 10,165 2,560 7,605
Item 10.
Page 71

Page 72

Funded from Transformation Earmarked Reserves
Joint Transition Plan 30 0 30
Total 30 0 30
Free School Meals Expansion 1,204 0 1,204
Expansion of UFSM 79 79 0
SERVICE DEVELOPMENTS
Levelling Up Fund 176 0 176
Detached Youth Workers (8x0.69FTE) 200 0 200
Community Wardens (2FTE) 90 0 90
Total 1,749 79 1,670 0
Total 11,944 2,639 9,305
* One year No longer required - if slipped into future years please give more details in Col I
Not taken and uncertain if required - please give more detail
Not taken but still required - please give more details
Taken in full, or if more than original allocation - more details required
FUNDING FOR NEW DUTIES
Page 72

Page 73

SAVINGS QUARTER 1 APPENDIX 5
Ref Description Amount Posted Balance Status Reason for balance
£000 £000 £000
2023/24 opening position adj
Service Concession PPP (1,168) - (1,168) Saving will be taken next quarter but exact
amount not calculated
Reduction in reinvestment costs (Children's
Services)
(18) - (18)
Review of purchasing card (30) - (30) VAT saving - to be confirmed which
budgets to take the saving against
Approved when 2023/24 budget set:
Environmental & Commercial Services
Roads maintenance - hire out machinery (100) - (100) Vehicles ordered but delivery not
expected until later in 2024/25
Dallachy - closure (630) - (630) Budgets to be reviewed alongside NESS
EfW operating costs
Stop School Transport on In Service Days (6) 6 0
Harbours commercial income (30) 30 0
Building cleaning HQ (20) - (20) May not be the full £20k.  Saving from
1/8/24 and pay protection for 3 months. 
Will update for Q2.
Waste Management - Increase charges for garden
waste to £50
(308) 308 0 Income is below budget but savings have
been taken in 24/25
Open Spaces - Uplift burial charges to full cost
recovery
(165) - (165) Burial charges were increased with the
aim of increasing income to meet the
costs of the service. Income is reported as
a PI and is currently below target. Saving
to be processed.
Open Spaces - Maintain parks of Common
Good/Trust land from income from CG/Trusts as far
as possible
(92) - (92) Figures are proposed for recharging
against disbursable trust funds. Available
funds to be confirmed.
Catering - Dynamic Pricing (6) 6 0
Catering - Withdraw from Food for Life (70) 70 0
Fleet - Lease Specialist Vehicles (76) - (76) Fleet have identified externally leased
vehicles that can be ceased and therefore
reduced costs. User departments will
share existing vehicles/plant. When
vehicles have been collected, savings will
then be generated and processed.
Waste Management - Reduce HWRC opening
hours (close 1 weekday)
(50) - (50) To be confirmed.  Not sure if this was a
full year saving.  Closure not until Oct
Admin - Remove 1fte (28) 31 3
Roads Maintenance - Reduce street lighting
maintenance budget
(25) 25 0
Roads Maintenance - Reduce operational staff by
3fte
(100) 102 2
Elgin Car Parking Review - fye (311) 311 0
Energy from Waste reduced gate fee due to
Electricity generation (minimum £300k)
(150) - (150) Budgets to be reviewed alongside NESS
EfW operating costs
Sponsorship income (10) - (10) Income being confirmed with department
before any saving will be posted
Lands and Parks - reduce Glyphosate use (8) - (8) Saving to be posted in Q2
Economic Growth and Development
Statutory fees for planning applications (40) - (40) Income currently exceeds target.  Will post for
Q2
Employability - restructure the service so 1
keyworker is externally funded
(13) 14 1
Economic Development - Reduce budget for
Business Gateway Advisor by 0.2fte reflecting
current level of staffing
(11) 12 1
Environmental Health and Trading Standards -
Remove 1 Animal Services Officer post
(30) 30 0
Planning Income (4) 4 0
Building Standards (24) 24 0
Building st - enforcement (18) 18 0
Fair Trading (38) 38 0
Education
Learning Technologist (50) - (50)
Perfomance monitoring (52) - (52) VER and supernumerary to be effective
Q2 - indicatvie timescales end July 2024
Fraud post (24) 24 0
Money Advice (66) 95 29
Moray Training - VER (102) - (102) Saving to be posted
Strategic Planning (Appendix 4 item 10) (33) 34 1
Environmental Health (Appendix 5 item 10) (48) - (48)
Item 10.
Page 73

Page 74

Corporate/Cross service
EV / ULE salary sacrifice (20) - (20) As of June 2024 this has not yet become
operational
Increase vacancy factor in line with pay awards (640) - (640) Awaiting pay award detail 2024
NESPF rate decrease from 19.3% to 14.3% wef 1
April 2024
(2,560) 4,456 1,896 Saving was based on an original rate
reduction from 19.3% to 16.4%. The actual
contribution rate from 1 April 2024 reduced to
14.3%, which has given £1,.896m more
savings than estimated (inc H&SC below)
Empty Property Relief (338) 338 0
Discretionary NDR Relief (27) 27 0
Corporate Training (56) 57 1
Budget templates
Primary Advisor role (15) 15 0
Housing and Property
Homelessness - Negotiate discount for block
pourchased temporary accommodation
(96) 96 0
Homelessness - Allocate a further 5 flats for
homelessness accommodation
(5) 5 0
Housing Needs - Allocate 50% of Housing Support
costs to HRA
(197) 220 23
Housing General Services - Reallocate duties to
HRA, reflecting general pattern of support reqd for
Gypsy Travellers
(8) 8 0
Property - Take a more commercial approach to
rent reviews
(65) 65 0
Property - Close two corporate offices (25) - (25) Not yet achieved in Q1, awaiting
information from Budget Manager
Temporary Accommodation - increased charging
policy
(42) - (42) This was already taken as part of the
opening postion adjustments
Langstane rental 8 8
Education
Early Learning & Childcare (ELC) - Delete Early
Years PSA
(12) 12 0
ELC - Reduce Early Years teaching team by 2
posts
(83) 83 (0)
Primary - Pupil teacher ration move to statutory
requirement
(42) - (42) Will not know whether this can be
achieved until census figures are received
in September
Secondary Schools - Reduce DSM (188) 192 4
Central Education - Remove 1QIM (109) 85 (24) Balance will be taken next year - reduction
from August
Schools Energy saving 0 150 150
MGD EY Stem PM end of funding 0 58 58
ELC CMP - NM's wks & 36.25-35hrs saving 0 62 62
Education Resources and Communities
Business Admin - Remove 4 fte posts (55) 111 56 The saving was to be over 2 years but due to
vacancies it has all been taken in 24/25. There
will be no further saving in 25/26
Primary School FM - Delete PAT testing post and
contract out
(27) 27 0
Sport and Culture - Replace mobile library with
redesigned service
(20) - (20)
Will be posted in quarter 2
Sport and Culture - Remove Health and Wellbeing
Officer post
(51) 51 (0)
Communities Team - Remove 1 Outdoor Learning
post
(59) 60 1
Communities Team - Remove 1.75fte from the 
Community Support Unit
(88) 88 0
Communities Team - Reduce community capacity
training budget
(4) 4 0
Elgin Community Centre closure - VER (163) 72 (91) This will not be fully achieved - £51k will be
posted in qtr 2. There is a £71k budget in
surplus property, this saving will be made
when the building is sold which expected to be
in 2026.
Library contract management systems (7) 7 0
Relocate staff from Auchernack plus Forres
Community Centre staff restructure
(20) 23 3
Governance, Strategy and Performance
Customer Service - Print contract (13) 13 0
Customer Service - Reduce Contact Centre staff by
4fte
(114) 114 0
Welfare Benefits & Money Advice - Co-locate
Citizen's Advice Bureau
(20) - (20) CAB have not yet agreed this move (as of 
May 2024)
Page 74

Page 75

HR, ICT and Organisational Development
HR  - Cease central short leating (50) 49 (1)
Financial Services
Procurement - Reduce the Buying Team by 1fte (31) 32 1
Childrens Services
Children's Services savings target (454) 454 0
Indicative Savings from I&M programme
Stream 2: ICT & Digital - Schools Admin (56) - (56) Progress to be confirmed with department
Stream 4: Review & Expansion of Flexible Working (44) - (44) Saving to be confirmed and posted in Qtr 2 if
achieved
Care placements (245) 245 0
Reduction in reinvestment costs (4) - (4) Saving to be confirmed and posted in Qtr 2 if
achieved
LEAN review (125) - (125) Saving to be confirmed and posted in Qtr 2 if
achieved
TEMPORARY SAVIINGS
Approved when 2023/24 budget set:
Grampian Valuation Joint Board - refund 2018/19,
2020/21, 2021/22, 2022/23
(62) - (62) Amount will be confirmed when the accounts
for 2023/24 are audited and approved by the
Board
LHEES saving 23/24 (50) 50 0
CHARGES
Income target per budget paper (342) 198 (144) Charges to be posted in Q2
Total Approved when budget set (9,370) 8,715 (655)
Savings c/fwd from 2023/24 (1,216) 0 (1,216)
Balance at Qtr 1 (10,586) 8,715 (1,871)
* Status
Saving not taken and wont be achieved this year - details to be given
Saving not taken and uncertain if it will be achieved in full this year
Saving taken, or will be taken, in full
Page 75

Page 76

Page 76

Page 77

APPENDIX 6
General Reserves Committee
reference
Approved
£000s
Budget
released
£000s
General Reserves @ 1 April 2024 6,000
Free balance @ 30 June 2024 6,000
Working Ear marked Reserve Committee
reference
Approved
£000s
Budget
released
£000s
Balance @ 1 April 2024 8,686
Less commitments against reserves when
budget was set:
To balance budget MC 28/2/24 (5,729)
Funding from reserves approved in 2023/24
Corporate Training MC 26/6/24 (50)
Homelessness MC 26/6/24 (20)
Economic Development (East of Scotland
Homes Fund)
MC 26/6/24 (45)
Burial Grounds - Headstones Inspections MC 26/6/24 (10) 10
Open Spaces - Tree Inspections MC 26/6/24 (67) 67
Approved use of reserves (5,921)
Free balance @ 30 June 2024 2,765
Ear marked Reserves for specific projects Committee
reference
Approved
£000s
Budget
released
£000s
Balance @ 1 April 2024 5,073
Free balance @ 30 June 2024 5,073
Item 10.
Page 77

Page 78

APPENDIX 6
Transformation Ear marked Reserve Committee
reference
Approved
£000s
Budget
released
£000s
Balance @ 1 April 2024 6,152
Revised IMP - Raising Attainment (596)
Project Management revenue costs for closure
of two corporate offices
SMC 25/10/23 (105)
Plan for Just Transition Moray MC 28/2/24 (30)
(731)
Free balance @ 30 June 2024 5,421
Council Priorities ear marked Reserve Committee
reference
Approved
£000s
Budget
released
£000s
Balance @ 1 April 2024 3,134
Free balance @ 30 June 2024 3,134
MGD Cash Flow Reserve Committee
reference
Approved
£000s
Budget
released
£000s
Balance @ 1 April 2024 4,000
Free balance @ 30 June 2024 4,000
Service Concession (PPP) Committee
reference
Approved
£000s
Budget
released
£000s
Balance @ 1 April 2024 7,526
Free balance @ 30 June 2024 7,526
Page 78

Page 79

REPORT TO: CORPORATE COMMITTEE 27 AUGUST 2024 
SUBJECT: BEST VALUE ACTION PLAN PROGRESS REPORTING 
BY:  DEPUTE CHIEF EXECTUIVE (EDUCATION COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT 
1. REASON FOR REPORT 
1.1 To inform the Committee of progress against the actions set out in the
Council’s Best Value Action Plan since it was approved in April 2024. 
1.2 This report is submitted to Committee in terms of paragraph III B (41) of the
Council’s Scheme of Administration, Best Value being a cross-cutting issue
that does not fall within the remit of a particular committee. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee reviews and notes the progress
made against the actions in the Council’s Best Value Action Plan
(Appendix 1). 
3. BACKGROUND 
3.1 Councils in Scotland have a statutory duty to demonstrate Best Value,
introduced in the Local Government (Scotland) Act 2003.  Statutory Guidance
defines Best Value as:   
• ensuring that there is good governance and effective management of
resources, with a focus on continuous improvement, to deliver the best
possible outcomes for the public. 
3.2 In March 2020 the Scottish Government published refreshed Best Value
guidance requiring councils to demonstrate a focus on continuous
improvement in performance around seven themes:
• Vision and leadership
• Governance and accountability
• Effective use of resources
• Partnerships and collaborative working
• Working with communities
• Sustainability
• Fairness and equality
Item 11.
Page 79

Page 80

3.3 The Corporate Committee on 23 April 2024 agreed a new Best Value Action
Plan that set outs the Council’s priorities for the next 3 years to enable it to
meets its Best Value duty (paragraph 6 of the minute refers).  The plan takes
account of, and supersedes the consolidated list of improvement actions
which bring together recommendations from a number of sources in relation to
the Council’s progress in achieving its Best Value duty and the output from the
Council-Wide Strategic Self-Assessment of Performance by both councillors
and officers. 
3.4 The Committee also agree that the Best Value Action plan will be monitored
on a quarterly basis and Appendix 1 provides the first quarterly monitoring of
the actions in the Plan.  As well as reporting to Committee, arrangements are
in place to ensure that the Corporate Management Team has regular
oversight of performance monitoring of progress on the actions in the plan to
ensure that work is prioritised and early remedial action can be taken if
required. 
3.5 Progress is on target in implementing the actions in the Best Value Action
plan with a number of actions being concluded and key highlights in progress
as noted below: 
i) Performance reporting – actions are completed on the Corporate plan
and delivery framework which were approved by Council in February
2024 and on the Public Performance report that was agreed in June
2024.
ii) Continuous improvement – work is progressing well to re-activate the
Public Sector Improvement Framework (PSIF) and align other
improvement tools to that.  Contact has been made with the
Improvement Service to support renewed work on PSIF
iii) Transformation Strategy has been reviewed and agreed by Council in
April 2024
iv) The Workforce Working Group has been established and the Workforce
Strategy is reported on this Committee agenda.
v) The Short to Medium Term Financial Plan is complete and was approved
by the Council in June 2024.  The savings plan is being developed for
reporting in September.
vi) Partnership working is progressing per the plan with consideration
underway of how to build on the current strengths of locality plan work.
vii) Guidance to mainstream participatory budgeting has been developed
and issued to all services.
viii) The equalities actions are all well progressed with 5 of 6 actions
completed. 
3.6 The Best Value Action Plan sets out an ambitious programme of work and it is
important to maintain pace to ensure that targets are delivered.  The next
planned stages of work due in September (except savings plans) are noted
below and will be reported in the next committee cycle to Corporate
Committee (CC) on 5 November or Full Council (FC) as appropriate: 
Page 80

Page 81

Financial Management: 
i) Development of savings plan for short to medium term (August 2024) – 
Full Council 25 September 2024.
ii) Review of Capital Plan (September 2024) FC 25 September 2024.
iii) Review of Asset Management Strategy (September 2024) CC
November 2024.
iv) Review of Reserves Policy (September 2024) CC November 2024.
v) Medium to Long Term Financial Plan – FC December 2024. 
Sustainable Development 
i) Sustainable Development Statement (September 2024) CC November
2024. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The Best Value Action Plan supports the Council to deliver the priorities
in the corporate plan and supports the council values of Improving: drive
improvement; Ambitious: ensure sustainable and efficient services; and
Responsive: promote community participation and involvement and
involve our communities. 
(b) Policy and Legal
The Best Value Action Plan supports the Council to fulfil its statutory duty
to demonstrate Best Value, introduced in the Local Government
(Scotland) Act 2003. 
(c) Financial implications
There are no specific financial implications, however, the Best Value
Action Plan supports the Council in its duty to make best use of
resources and there are a number of specific actions that relate to
financial management that are moving forward. 
(d) Risk Implications
There are risks associated with not making adequate progress on the
actions set out in the Best Value Action Plan.  The Council has had
feedback from a number of external stakeholders that identified areas for
improvement and failure to address these through the planned actions is
likely to lead to adverse reporting and implications for the council. 
Several of the Best Value themes feature on the Council’s Corporate
Risk Register including leadership, financial sustainability and workforce
development.  Progressing the actions in the Plan will also secure
improvements in the management of these risks. 
(e) Staffing Implications
There are no specific staffing implications arising from this report. 
Page 81

Page 82

(f) Property
None 
(g) Equalities/Socio Economic Impact
This is covered in the Best Value inspection regime itself and the
Council’s duty to deliver best value. 
(h) Climate Change and Biodiversity Impacts
This is a key component of Best Value 
(i) Consultations
CMT/SMT have contributed to the progress monitoring set out in
Appendix 1. 
5. CONCLUSION 
5.1 This report provides the first quarterly monitoring of the Council’s Best
Value Action Plan (Appendix 1) since it was approved in April 2024. 
Although delivery is at an early stage, progress is noted in a number of
areas where actions have been completed and work is underway to
ensure the plan is completed on target. 
Author of Report: Denise Whitworth
Background Papers: Corporate Committee report on Best Value Action plan
23 April 2024 (item 5a)
Ref: SPMAN-1108985784-996 
Page 82

Page 83

2c3f2c81-31ba-4c81-81d4-24ef95052b2d - Summary
Report Date 27/08/2024
BRAGG Status - KEY BLACK -
Completed
RED -
Concern
AMBER -
Caution
GREEN On
Target
GREY - Not
Started
Lead Officer Priority Delivery Date Schedule % Complete
BEST VALUE ACTION PLAN Aug-26 GREEN 36%
Mar-26 GREEN 32%
CEx/Council (CL) 1 Dec-24 GREEN 25%
DCE (ECOD) 3 Jun-25 GREEN 6%
H HR,ICT & OD 1 Dec-24 GREEN 10%
CEx / DCE (ECOD) 2 Mar-26 GREEN 20%
DCE (ECOD) 3 Jun-24 Complete 100%
Jan-25 GREEN 24%
HoGSP 3 Oct-24 GREEN 0%
HSC CO / CEx 1 Jan-25 Not Started 17%
HoGSP E April 24 /  25* GREEN 70%
H HR,ICT & OD E Sept 25* GREEN 10%
Aug-26 GREEN 37%
CEx / DCE (ECOD) 1 Aug-26 GREEN 36%
CEx 2 Sep-24 GREEN 58%
CEx / DCE (EEF) / CFO 1 Dec-24 GREEN 17%
Oct-25 GREEN 21%
DCE (EEF / ECOD) 2 Oct-25 GREEN 21%
Summary: The 6 month review of scrutiny training is not yet due. Under the Risk Management project, the annual review of departmental risk registers that feed wider risks into Corporate Risk
Register is complete as is the work on the corporate overview of business continuity and resilience which was reported to committee in April 2024.Work on business continuity is progressing
as planned.  Work on digital resilience is also progressing with Cyber awareness training across the workforce having taken place.
Summary:  The refresh and refocus of the Transformation Strategy is complete and was approved by the Council in April 2024.  Work is also well progressed on developing project mandates
for new projects to assess merits and progress  continues on active projects. On workforce, the workforce working group is established and the update workforce strategy and plan is on track
to be reported in August. The capital plan is at the early stages of review under the Financial Management project and the Revised Short to Medium Term Financial Strategy is complete and
was reported to Council on 26 June 2024. Preparatory work is underway for the remaining actions and is currently on target.
3. Effective Use of Resources
3.1 Transformation and Sustainable Services
3.2 Workforce Planning
3.3 Financial Management
4. Partnerships and Collaborative Working
4.1 Partnership Working for Moray
2.4 Digital Resilience Management
Summary:  Work is progressing as planned on collaborative leadership with the external consultant work completed and report scheduled for Corporate Committee in August setting out
progress and planned next steps.  Community Planning and engagement is in the early stages of planning and work to review the role of the community engagement group for community
planning is well progressed and due to be reported to the CPB.  Leadership development action is also at an early stage and the next planned step is reporting to CMT for direction. 
Implementation of self-evaluation to deliver continuous improvement is progressing with the re-activation of the PSIF process moving forward and planned work with the Improvement
Service to support delivery. All actions within this BV theme are currently on target.
1. Vision and Leadership
1.1 Collaborative Leadership - ensuring members and officers work effectively to secure key
1.2  Community and Partner Engagement on Council priorities
1.3 Leadership Development Action
1.4 Continuous Improvement – implement self-evaluation.
1.5 Performance Reporting
2. Governance and Accountability
2.1 Effective Scrutiny
2.2 Sound Governance
2.3 Risk Management
Page 1 of 2
Item 11.
Page 83

Page 84

2c3f2c81-31ba-4c81-81d4-24ef95052b2d - Summary
Jun-25 GREEN 14%
DCE (EEF / ECOD) 2 Jun-25 GREEN 14%
Sep-24 GREEN 35%
DCE (EEF) 3 Sep-24 GREEN 35%
Normal business GREEN 92%
HoGSP 2 Normal business GREEN 92%
Summary: Progress has been made in mapping the Council Corporate strategies relevant to sustainable development  against National Performance Indicators and corporate priorities;
identify areas of focus 2024-2029, SD changes expected and PIs to monitor progress; finalise draft principles. It is planned to bring this forward for wider consultation and involvement on the
sustainability statement.
Summary:  Guide to mainstream PB developed by CSU and circulated to all services.  Consideration is being given to the use of online tools and website enhancement to support
engagement.  Work to review the operation of the Community Engagement Group has been completed and considered by the Group and will be taken to the CPB for discussion and
consideration of future approaches. £109,000 via UK shared prosperity fund was allocated via PB to eligible arts, culture and heritage groups (July 24)
Summary: Work with community planning partners is moving forward to develop shared priorities for the LOIP and there is early indicative support to develop a single Moray plan.  Locality
plans are well developed and ongoing and consideration is now planned of learning across partners and service areas to identify opportunities for learning and greater impact from partners
working more closely
Summary:  This workstream is well advanced and the planned actions are complete for: equality and socio-economic duty actions and consideration of these within committee reports;
Integrated Impact Assessments were carried out on budget proposals and the views of equality groups were sought where appropriate. The remaining action is for staff training on equalities
and the council equalities as an employer and this is underway and on target
5. Working With Communities
5.1 Community Budget Engagement ensuring local communities are more in Participatory
6. Sustainable Development
6.1 Sustainable Development
7. Fairness & Equality
7.1 Equalities Action
Page 2 of 2Page 84

Page 85

REPORT TO: CORPORATE COMMITTEE ON 27 AUGUST 2024 
SUBJECT: CORPORATE RISK REGISTER – QUARTERLY UPDATE 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To provide the Committee with the quarterly overview of the council’s principal
risks as detailed in the Corporate Risk Register. 
1.2 This report is submitted to Committee in terms of Section III (B) (36) of the
Council's Scheme of Administration relating to council wide or corporate risk
assessment and the mitigation and management of these risks. 
2. RECOMMENDATION 
2.1 It is recommended that Committee considers and approves the overview
update on the council’s principal risks as of July 2024 attached as
Appendix 1 to this report. 
3. BACKGROUND 
3.1 The Committee last reviewed the Corporate Risk Register on 23 April 2024
(paragraph 9 of the minute refers). It was agreed at the meeting that an
overview update would be appropriate at quarterly intervals, with a full review
taking place semi-annually.  
3.2 The higher scoring risks at that time and thus those presenting the greatest
challenge and potential exposure for the Council covered five themes, namely
collaborative leadership, finance, HR staffing, environmental, and ICT
(technological) risks. For each of these, risk mitigation measures had been put
in place, yet the residual risk scores remained high. 
3.3 Three months later, the position in terms of risk scores is broadly unchanged.
External factors not within the council’s control continue to have a bearing on
the nature of the risks to be faced and how they are managed. Nonetheless,
the council has acknowledged through the Best Value process that it must
endeavour to secure continuous improvement, and to manage down risk to
the extent possible where such risk might impede delivery of agreed plans.
Since the last iteration of the Corporate Risk Register was prepared, a Best
Value Action Plan has been developed and approved at a meeting of the
Item 12.
Page 85

Page 86

Council on 11 June 2024 (para 3 of the minute refers). The plan is challenging
and brings focus to actions necessary to aid the council to deliver its functions
in a sustainable manner. 
3.4 The Best Value Action Plan, which includes target timescales, has been
developed for implementation over a three year period. A number of actions
are already underway. For example, improvements in collaborative leadership
have been supported by external advisers, and further consideration is being
given to determine potential savings given the council’s projected financial
position going forward. Overall these interventions are designed to have a
positive effect on the risks currently faced but will not fully mitigate them, and
ongoing monitoring of the impact of any changes to the environment in which
the council operates will be necessary.           
3.5 The overview update on the council’s principal risks is attached as Appendix
1.  Attention is drawn to following:   
3.6 Collaborative Leadership: The support provided by external advisers and
the work of the Council Leader and Senior Councillors on this topic has been
acknowledged as beneficial across all political groups. This has strengthened
the leadership and decision making processes of the council, and further work
is planned to sustain this position. The overall risk score has been reduced
from 15 (likelihood 3 x impact 5) to 12 (3 x 4). 
3.7  Finance: The Council for a number of years has pursued various initiatives to
generate financial savings and, like all local authorities, to deliver services
against a background of challenging financial settlements. Again for 2024/25,
a balanced budget has been achieved albeit with use of reserves. Based on
information known at the time of drafting this report, significant savings will be
required ahead of setting the budget for 2025/26 and update reports on
financial planning and on transformational change are due to be considered
by council in early course. Because of continuing uncertainty relative to future
financial settlements and demands on available resources, financial risk
remains at the highest level, scoring 25 (likelihood 5 x impact 5). 
3.8 HR (Staffing): A recurring theme in working with services on service risks is
the difficulty in recruitment of certain staff groups and the impact this can have
on service delivery. Again at least in part this can be attributable to the wider
employment market. HR through its workforce plan and other initiatives is
endeavouring to make the council an attractive choice for those looking for
employment in the public sector. The risk score is unchanged at 20 (likelihood
5 x impact 4). 
3.9 Environmental: A just transition to net zero is one of three shared ambitions
of both Scottish Government and Local Authorities in the Verity House
Agreement, and the council has set out a raft of policy proposals designed to
effect positive change. Some of these are already having effect, others are
longer term objectives and will require innovative solutions, in some instances
working in partnership. Significant investment will be required to meet agreed
targets but given progress to date, the risk score has been reduced from 16
(likelihood 4 x impact 4) to 12 (likelihood 4 x impact 3). 
Page 86

Page 87

3.10 ICT (Technological): Effective use of technology is a key to ensuring the
council functions with optimum efficiency. Hence there is a need to embrace
new opportunities while at the same time remaining alert to the threats of
disruption and the impact such disruption could have on service delivery.
Appropriate plans and controls are in place; however the residual risk is high
remaining at score 20 (likelihood 4 x Impact 5). 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Effective risk management practices are necessary to evidence how the
Council identifies and seeks to address any issues that may impact on
its ability to deliver its stated priorities and plans. 
(b) Policy and Legal
Robust risk management practice is an essential component of good
governance. 
(c) Financial implications
The risk register recognises the financial challenges facing the
council and the importance of addressing these. There are no direct
financial implications arising from this report. 
(d) Risk Implications
Risk and its management is the subject of this report. 
(e) Staffing Implications
No direct implications 
(f) Property
No direct implications. 
(g) Equalities/Socio Economic Impact
No direct implications. 
(h) Climate Change and Biodiversity Impacts
The risk register refers to climate change considerations under
Environmental Risks. No direct implications. 
(i) Consultations
The Corporate Management Team and Heads of Service have
participated in this latest overview of the risk themes identified in the
Corporate Risk Register. 
5. CONCLUSION 
5.1 The Committee is asked to consider and approve the latest evaluation of
higher scoring risk themes in the Corporate Risk Register as at July
2024. 
Page 87

Page 88

Author of Report:  Alasdair McEachan, Head of Governance, Strategy and
Performance.
Background Papers:  Corporate Risk Register - April 2024 
Ref:   
Page 88

Page 89

Appendix 1
Moray Council - Corporate Risk Register
Overview of changes in period to 31 July 2024 
Based on 5x5 Matrix = Highest risk score 25 
Risk
Theme
Residual
Risk Score
April 24
Current work/ Impacts Commentary Indicative
risk score
July 24
Higher
scoring risks    
Financial 25
(Likelihood 5
x Impact 5)
• Annual Accounts audit to demonstrate
probity in use of financial resources.
• Early consideration of financial pressures
for future years beyond 2024/25 – budget
workshop involving senior managers held.
• Unknown political considerations
nationally and in Scotland re future
funding of Local Government. 
• Consideration of Best Value commentary
on revenue budget forecasting and
monitoring.
• Consideration of Best Value observations
on capital programme noting major
elements are dependent on ring fenced
funding – e.g. for new school building or
growth deal programmes. 
• HSCM agreed package of service
reductions to achieve savings;
consultation still to take place which is
With council dependent on
external sources for its main
revenue funding streams,
residual risk likely to remain
high. Overall risk score
unchanged.
25 (5 x 5)
Item 12.
Page 89

Page 90

Risk
Theme
Residual
Risk Score
April 24
Current work/ Impacts Commentary Indicative
risk score
July 24
likely to take some time and meet
resistance from those impacted by
change. Service demands increasing.
• Funding of pay awards for 2023/24 still to
be formally confirmed. 
HR (staffing) 20 (5 x 4) • Best Value Improvement plan agreed but
resourcing delivery of same under review-
balancing ambition with capacity to
deliver. 
• Best Value thematic review draft report
and recommendations under
consideration.
• Refreshed Workforce and Organisational
Development strategy and plan prepared
with input from Workforce Working Group.
• Draft Recruitment and Retention Project
Plan developed to provide focus for work
on this topic.
• Review of practical implementation of
Health and Work policy planned to assess
impact and potential requirement for other
actions
Refreshed HR strategy and draft
project plan for recruitment
should assist in focusing limited
resources on areas of greatest
potential impact, however the
challenge remains to make the
council an attractive place to
work.
Overall risk score unchanged. 
20 (5 x 4)
ICT 20 (4 x 5) • ICT and Digital strategy refreshed
including reference to Digital Maturity
Assessment and digital development
opportunities including use of Artificial
Intelligence. Significant additional work
will be required.
• Continued increase in volume of daily
threat warnings for cyber security as well
This risk remains high as a
consequence of external threats
and the impact that interruption
to ICT services would have on
the organisation.
Risk score is unchanged. 
20 (4 x 5)
Page 90

Page 91

Risk
Theme
Residual
Risk Score
April 24
Current work/ Impacts Commentary Indicative
risk score
July 24
as human error creates significant risks of
disruption. Resourcing of planned cyber
work to manage this threat is under
consideration.
• Modular training for staff in cyber and data
security has been developed to raise
awareness of key risks. 
• Business Continuity Planning updates
giving consideration to impacts should
access to ICT systems be lost for
extended periods. 
Environment 16 (4 x 4) • Zero Emission fleet replacement strategy
agreed.
• Climate Change Strategy prepared and
route map to net zero updated annually.
• Climate Change Board established.
• Moray Hydrogen Strategy prepared.
• Possibility of hydrogen plan being
developed locally considered through
planning but challenging hurdles to
overcome.
• Local Heat Energy Efficiency Strategy
consulted on and scheduled for approval
in August 2024.
• Elgin Heat Network Viability study being
prepared.
• External funding for school estate
improvements predicated on new builds
being to energy efficient standards.
• Various active travel initiatives promoted
including M - Connect
Multiple positive initiatives being
taken forward work but progress
much dependent on substantial
funding to realise desired
improvements. The possibility of
these initiatives having limited
success remains if insufficient
funding is available.
Immediate risk is being
managed through agreeing what
needs to be done but longer
term challenges remain. 
Likelihood score remains higher
at 4 with impact neutral at 3 on
the basis that the council has
the necessary policies in place,
with impact having the potential
to increase again if targets are
unaffordable/unachievable
moving forward.
12 (4 x 3)
Page 91

Page 92

Risk
Theme
Residual
Risk Score
April 24
Current work/ Impacts Commentary Indicative
risk score
July 24
• Energy efficiency standards for social
housing (EESSH) considered as part of
Housing Investment plan.
• Recycling a success and residual waste
no longer going to landfill.
• Coastal adaptation plans approved.
• EV charging strategy under consideration
Collaborative
Leadership
15 (3 x 5) • Report on outcomes recommended by the
external adviser to support member/officer
working (recommendation 2) in
preparation for consideration by
Committee.
• BV report provides for a collaborative
leadership programme to be provided by
October 2024.
• Specific actions for various groups
required with a review of progress in
December 2024.
Work carried out to date and
benefits of monitoring progress
through Best Value action plan
could leave likelihood at neutral
3 and reduce impact marginally
but still high (from 5 to 4) which
would score 12 and continue to
monitor.
12 (3 x 4)
Lower
scoring risks    
Regulatory  9 (3 x 3) • Potential issues may arise should cuts
have greater impacts than previously on
statutory services. 
• Risks over implementation of new areas
of regulatory activity including short term
lets and implementation of the United
Nations Convention on the Rights of the
Child
Assessed as appropriate to
leave as is for now, albeit with
close monitoring of the impact of
any policy changes were these
may impact won regulatory
compliance. 
9
Page 92

Page 93

Risk
Theme
Residual
Risk Score
April 24
Current work/ Impacts Commentary Indicative
risk score
July 24
• Slight risk of increased non-compliance
with policy regulations and practice if
service delivery more challenging.
• Indication previously of capacity to meet
obligations in one service, not aware of
any others.
• Overall assessment is that council has
standards of governance that support
compliance with regulatory requirements.
Reputational 10 (5 x 2) • Best Value and Budget continue to have
potential for a major impact on reputation.
• Any diminution in services tends to attract
criticism from those impacted.
• Hard to gauge wider impact of inspection
reports where these are critical in nature. 
Likelihood previously was
assessed as very high given
council requirement to consult
on multiple issues. While this
informs decision making and
engenders ownership it
invariably leads to criticism from
those whose expectations are
unmet. The impact of such
criticism should be limited if due
process is followed.
Overall score unchanged.
10
Operational
Continuity and
Performance
9 (3 x 3) • Operational continuity and performance
may be affected as a consequence of
service re-design. 
• Agreed to improve timeliness of
performance monitoring as part of BV
action plan. 
Overall this risk has been rated
as neutral and should remain so
providing service standards are
considered alongside any
changes to resourcing of
services.
9
Economic
Sustainability
12 (3 x 4 • Economic development and planning in
line with local development plan -new plan
Anecdotally many sectors in the
local economy are buoyant.
8 (2 x 4)
Page 93

Page 94

Risk
Theme
Residual
Risk Score
April 24
Current work/ Impacts Commentary Indicative
risk score
July 24
scheduled for 2027. Evidence submitted
to Scottish Government in June 2024
• Growth Deal projects being progressed
with some now in delivery.
• Taking opportunities to utilise other
funding streams e.g. for town centre
redevelopment, levelling-up fund and just
transition fund. 
• Continued working with partners to deliver
the ten year strategy through Moray
Economic Partnership.
• Promotion of apprenticeships, developing
the young workforce and similar initiatives
in place.
• Childcare Action Plan in preparation.  
With the interventions described
here council is fulfilling its role.
Assessment is to reduce
likelihood to two but leave
impact at four as issues remain
in some areas e.g. attracting key
workers into Moray and
provision of childcare. 
Page 94

Page 95

REPORT TO: CORPORATE COMMITTEE ON 27 AUGUST 2024 
SUBJECT: LOCALISED POVERTY IN MORAY - UPDATE 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the updated position of localised poverty in Moray
and the actions being progressed through Corporate and Service Planning
aligned to reducing poverty. 
1.2 This report is submitted to Committee in terms of Section III (B) (41) of the
Council's Scheme of Administration relating to formulate and review Council
priorities and objectives in relation to poverty. 
2. RECOMMENDATION 
2.1 The Committee considers and notes the updated position and current
actions aligned to reducing poverty. 
3. BACKGROUND 
3.1 The Council participation in the Improvement Service ‘Rural Poverty Network’
throughout 2023 shared knowledge and methods used to monitor child
poverty in rural local authorities. 
3.2 In Moray, to complement the national datasets, localised sources across
benefits and money advice services were added and by applying similar
methods used by SIMD2020, internally a ‘Deprivation Index’ of Moray was
created to provide an updated position to the first iteration of the analysis
(Appendix 1). 
3.3 Key points from the analysis were – 
• Child Poverty (0-15) in Moray has increased by 2.8% between 2020/21 and
2021/22 to 24.1% (3,849 children) close to the national average of 24.5%.
• There were an estimated 470 more children living in poverty in Moray in
2021/22 in comparison with the previous year, representing a 14% increase
in the number of children.
• Between 2014 and 2022, the rate of increase in Moray has been greater
than that of Scotland.
Item 13.
Page 95

Page 96

• At data zone level, child poverty in Moray ranges between 0% and 65% (2
of every 3 children)
• 59% of the population live in ‘Urban’ areas, but 66% of children in poverty
live in these areas, evidencing a higher poverty density in urban areas.
• 26% of children living in ‘Urban’ areas are in poverty, in contrast to 21%
who live ‘Rurally’.
• The highest and lowest ranked Intermediate Zones are both in Elgin.
• The top seven ranked Intermediate Zones from 2020/21 remain the same,
but not all remain with the same rankings. These zones are all in ‘Urban’
areas.
• Only 5 Intermediate Zones witnessed a drop in the number of children living
in poverty between 2020/21 and 2021/22, the remaining 19 all showed
increases.
• Moray’s comparator ranking has declined since 2014 from 6th to 2nd (where
1st has the highest levels of child poverty) within the family group of eight
authorities and in addition witnessed the highest rise in poverty (3.2%)
amongst its comparators over the same period.
• Similar trend in national ranking since 2014 from 20th to 14th (where 1st has
the highest levels of child poverty) of 32 local authorities and witnessed the
8th highest rise in poverty. 
3.4 Actions included in the Corporate Plan and Service Plans aimed at reducing 
poverty are detailed in Appendix 2 and performance indicators gathered to 
measure progress in Appendix 3. In addition, significant efforts continue to 
be delivered in localities as part of locality planning. 
3.5 The first meeting of the reconvened Fairer Moray Forum is scheduled for the 
end of August. This will be a refreshed Forum as a strategic group within the
Community Planning governance arrangements and the membership is
currently under review led by the Chair. The data in this report will contribute
to the initial scoping exercise that will inform the strategic direction and
recommendations the Forum make to the Community Planning Board on a
partnership approach to tackling poverty. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) 
Poverty is a key priority in the Corporate Plan and LOIP 
(b) Policy and Legal
None arising from this report. 
(c) Financial implications
None arising from this report. 
(d) Risk Implications
None arising from this report. 
(e) Staffing Implications
None arising from this report. 
Page 96

Page 97

(f) Property
None arising from this report. 
(g) Equalities/Socio Economic Impact
None arising from this report. 
(h) Climate Change and Biodiversity Impacts
None arising from this report. 
(i) Consultations
The Corporate Management Team and Community Planning Officer
Group have been briefed on the content of the report. 
5. CONCLUSION 
5.1 The Council has planned activity aimed at reducing poverty, monitored
through Corporate, Service and Locality Planning reporting
arrangements. Localised data ensures work continues to be
appropriately targeted. 
Author of Report: Louise Marshall, Strategy and Performance Manager
Background Papers: 
Ref: 
Page 97

Page 98

Page 98

Page 99

An update of Localised poverty in Moray: Bringing
together national and local data to identify poverty
levels in Moray, showing changes in levels from
initial report in March 2023. 
AUTHOR: Iain Sneddon, Research and Information Officer, Moray Council
EXECUTIVE SUMMARY
Poverty1 in Moray is rising and doing so at a faster rate than Scotland as a whole. National data (End Child Poverty,
2021/22) for Moray, shows the percentage of children in poverty increased between 2014 and 2022 by 3.2% to 24.1%.
Over the same period, Scotland saw a rise of 2.9% to 24.5%. Only seven Scottish Local Authority areas have increased
at a greater rate than Moray during this time. In the last year alone (2020/21 -2021/22), Moray has witnessed a 2.8%
rise. In terms of ranking nationally against other authorities, Moray has fallen from 20/32 to 14/32 (where 1 is
highest).  Within our comparator authority group, from being placed 6/8 in 2014 Moray is now placed 2/8 in 2022. Of
all Scottish Local Authority areas, only Renfrewshire saw a greater decline in ranking, falling from 25th to 17th. 
The average gross full-time hourly pay (earnings by place of work) in Moray in 2023 at £15.942, is significantly less
than Scotland (£18.10) and ranks Moray 28/32 of Scottish Local Authorities, where 1 is highest. Moray bucks the trend
whereby full-time female workers earn more per hour (£16.09) than their male counterparts (£15.55). Calculations
based on weekly wage data, for all employed in Moray, shows an average working week of 40.6hrs, compared with
the Scottish average of 38.8 hrs/week. Even by working more hours a week, the average full-time weekly pay in Moray
(£647.2) is significantly less than the National average (£702.80). Due to this low wage economy Moray is likely to be
less resilient to increases in the cost of living in comparison with many other Scottish Local Authorities, which in turn is
a likely contributory factor in the rising levels of child poverty in Moray.
Other societal groups in Scotland do not experience poverty to the same levels as children. Scottish Government
statistics show that 21% of working-age people and 15% of pensioners were living in poverty (2019-22). In work
poverty is however increasing. Between 2009 and 2012, 52% of working-age people in poverty were within working
households, during 2019 and 2022 this had risen to 57%. Similarly, over the same period the proportion of children in
poverty from working households, increased from 51% to 69%. This may be indicative of wages and in-work benefits
not keeping pace with inflation. With a low wage economy and poverty levels in Moray rising at a faster rate than
Scotland it is likely that Moray will be disproportionately affected.
Looking at the national picture, Scotland compares reasonably well against other UK nations. As stated above, 24.5%
of children were living in poverty in Scotland in 2021/22.  At the same time, in England this rate was 30.8% and Wales
27.9%. In Northern Ireland rates were better at 22.2%.  During the ten-year period between 2012 and 2022 levels of
child poverty have risen in both Scotland (3.0%) and England (2.6%), whereas in Wales and Northern Ireland have
fallen by 4.4% and 4.3% respectively.
Unfortunately, national poverty data does not provide any insight into the levels of poverty within authorities. By
using a range of both national and local data, this report aims to show estimated levels of poverty/household financial
vulnerability for the smaller geographies in Moray. The level of poverty in Moray, as published in national data, shows 
1 The definition of poverty in this report relates to Relative Poverty / Child Poverty – described as: People / Children
living in households whose equivalised income is below 60% of UK median income in the same year after housing
costs (AHC).
2 Official Census and Labour Market Statistics (NOMIS)
Item 13.
Page 99

Page 100

24.1% of Moray children, in 2021/22 were living in poverty. The analysis carried out for Data Zone3 geographies of
Moray shows that estimated levels of poverty range from 0% to 64.8%.
METHODOLOGY
Poverty is predominantly based on available household income, as such most of the data sets used to estimate levels
in Moray, are based on benefits and advice services relating to income. In addition to income-based data, Scottish
Index of Multiple Deprivation (SIMD2020) data has been included in the analysis, but cognisance should be taken in
reference to SIMD2020 data as it identifies geographic areas where deprivation is highest, it does not identify
households or individuals. 
The National Records of Scotland (NRS) was used to provide household, population and urban/rural contextual data.
Children Living in Low-income Families data, for the period 2021/22, was extracted at 0-15 age range. National Child
Poverty data, at Local Authority level, provides a combined figure for children aged 0-15, and 16–19-year-olds, if they
remain within non-higher education. As no figure is available for the number of children remaining in education it is
not possible to make population comparisons. To allow for direct comparisons with population data, the 0-15 range
has been used in calculations to estimate Child Poverty. The data sources used, both national and local, are detailed in
Appendix 1. 
Scotland is divided into a number of smaller geographies, from Postcodes4 to Output Areas5 to Data Zones and then to
Intermediate Zones6, before reaching Local Authority level. Data has been extracted from sources at a variety of
geography sizes and accumulated to both Data Zone and Intermediate Zone level. For some data sets it was possible
to isolate child data, for example the Moray Food plus provides data for claimants by age of all individuals living
household, allowing for a more specific analysis. Unfortunately, there are insufficient data sets to allow the
compilation of tables which would provide analysis solely for children living in households.
All data was transferred into an Excel Workbook with a field for every element of data. Data was standardised to a
percentage by using population data for the geographic areas. Each data field was then ranked (1-126) with ranking 1
being the worst value. No weighting was applied to any field with all treated equally. To provide an overall ranking for
each data zone all field rankings were totalled. 
With the exception of SIMD2020, data is from the period 2021-2023 (Source dependent). All data used was from the
most recent time period available.
A special thanks to all the providers of local data, without which it would not have been possible to produce such a
detailed Poverty/household financial vulnerability information within Moray.
DATA LIMITATIONS
It is recognised that other factors can have an impact on household finances such as:
• Increased transport costs and access to public transport.
• Increased food prices in more rural areas.
• Access to mains gas and cost of alternative fuels.
• Properties in the most rural locations have a higher proportion of older, less well insulated, dwellings.
These factors could have a major bearing on rural poverty, however data is not available at smaller geography level
and where it does exist at Local Authority level is significantly outdated and would not contribute to the analysis. 
3 A data zone contains between 500 to 1,000 people. They are made up from groups of census output areas. There are
126 Data Zones in Moray.
4 Each postcode covers an average of 15 properties. Over 6,100 postcodes exist in Moray.
5 Census Output Areas (OAs) and Super Output Areas (SOAs) are geographical areas developed from Census 2001
information. OAs are the smallest unit, covering around 125 households.
6 Larger geographical areas containing an average of around 4,000 people. There are 24 Intermediate Zones in Moray.
Page 100

Page 101

TABLES
Intermediate Zone level was chosen to as the preferred geography to display the data within the main table (Table 2)
as it shows the extent of poverty/ financial vulnerability in one table with 24 rows, as opposed to Data Zone level
where data would be in 126 rows. Where data relates to Moray, comparator authority data has been used to provide
context.
The data listed in Table 2 is ranked from top to bottom in order of accumulated score ranking, with the highest levels
of poverty/ financial vulnerability at the top. For ease of reading, the accumulated scores are not provided within the
tables. The columns with ‘Child Poverty Estimates’ do not always flow sequentially from most to least; this is due to
the use of accumulated scores as a ranking measure as opposed to ‘Estimated Child Poverty’. Where available
comparisons are made with data in the previous report to show changes in levels and rankings.
TABLE 1: URBAN / RURAL DEMOGRAPHICS OF MORAY
Moray is classed as a rural Local Authority. Nationally 17% of the population live in rural locations, in Moray the figure
is significantly higher at 41.3%. In Moray, 39.3% of children aged 0-15 live in rural locations, indicating a lower
population density living rurally for this age group. Of the 9,679 children living in urban areas, 2,539 (26.2%) are
estimated to be living in Child Poverty. In comparison, the figure for those living rurally is lower at 20.9% (1,310). As
Table 1 shows of the percentage of all child poverty in Moray, 66% of these children live in urban areas. As this figure
is higher than the general population demographics for this age group, it is fair to say that child poverty levels are
higher in urban areas.
Table 1: Urban / Rural population demographics
Urban / Rural Population Demographics in Moray  
Population 0-15 Data Zones Estimated Child Poverty
Number % Number % Number % Number % % of all Poverty
Urban 56,562 58.7% 9,679 60.7% 75 59.5% 2,539 26.2% 66.0%
Rural 39,848 41.3% 6,262 39.3% 51 40.5% 1,310 20.9% 34.0%
TOTALS 96,410   15,941   126   3,849 24.1%  
Page 101

Page 102

TABLE 2: ANALYSIS BY INTERMEDIATE ZONE
Moray has 24 Intermediate Zones with an average population of 4,000 residents and an average of 664 children aged 0-15. The top seven ranked Intermediate Zones are all urban and whilst having 31.1% of the 0-15 population, they also have 43.3% (1,666/3,849) of
all Moray children estimated to be living in poverty. The average SIMD2020 decile ranking7 shows that both the most and least deprived areas are urban. The average ranking for all urban Intermediate Zones is 6, with rural Intermediate Zones ranking 7, showing
urban Intermediate Zones as more deprived and evidencing the linkages between deprivation and poverty. These average Intermediate Zone rankings are based on the aggregation of Data Zone rankings and don’t show the differences between urban and rural
areas as accurately as Data Zone level data does. Urban areas of Moray have 10 Data Zones within the most 30% (Deciles 1-3) deprived areas of Scotland. Conversely rural areas have only one. 
Of the 24 Intermediate Zones, rankings for eight have worsened, seven have improved and nine have remained the same since the initial analysis was carried out in late 2022. The top seven Intermediate Zones remain the same, but Elgin Cathedral to Ashgrove and
Pinefield has replaced Forres South West and Mannachie as having the lowest accumulated score. Although this would appear to show little change from the previous year the estimated levels of poverty/ financial vulnerability have increased significantly in all but
five Intermediate zones. The percentage change in Estimated Relative Child Poverty is expressed as an increase or decrease from the number of children recorded in the previous year (2020/21). Significant rises have been witnessed in Elgin Cathedral to Ashgrove
and Pinefield (12.1%) and Lossiemouth East and Seatown (13.6%). Overall, the data shows the estimated number of children aged 0-15 living in poverty has increased by 470 children (13.9%) between 2020/21 and 2021/22. 
Table 2 - Poverty/ Financial vulnerability in Moray by Intermediate Zone
INTERMEDIATE ZONES (HOUSEHOLD DATA) IN ORDER OF OVERALL RANKING (1=WORST, 24=BEST)
Ranking Intermediate Zone Name ASG Area
Average
Urban/Rural
2-Fold8
Total 0-15
Population
Average
SIMD2020
Decile
Previous
Ranking
Change
in
Ranking
% Estimated
Relative
Child
Poverty
2021/22
Estimated
number of
Children (0-
15) in Relative
Child Poverty
2021/22
% Change
in
Estimated
Relative
Child
Poverty
Increase/Decrease in
number of Children (0-
15) in Relative Child
Poverty 2020/21 -
2021/22
1 Elgin Cathedral to Ashgrove and Pinefield Elgin Academy 1 722 4 3 2 40.2% 290 12.1% 88
2 New Elgin East Elgin High School 1 811 5 2 - 37.5% 304 1.5% 12
2 Forres South West and Mannachie Forres Academy 1 812 5 1 -1 34.4% 280 1.2% 10
4 Buckie Central East Buckie High School 1 602 5 4 - 32.4% 195 1.0% 6
5 Keith and Fife Keith Keith Grammar School 1 681 5 5 - 33.1% 226 2.4% 16
6 Elgin Bishopmill East and Ladyhill Elgin Academy 1 527 5 6 - 29.9% 157 6.2% 33
7 Lossiemouth West Lossiemouth High School 1 805 6 7 - 26.6% 214 6.3% 51
8 Cullen, Portknockie, Findochty, Drybridge and Berryhillock Buckie High School 2 843 7 9 1 30.9% 261 4.1% 35
9 Fochabers, Aultmore, Clochan and Ordiquish Milne's High School 2 444 6 8 -1 23.0% 102 -0.8% -3
10 Lhanbryde, Urquhart, Pitgavney and seaward Elgin Academy 2 610 6 13 3 24.3% 148 4.5% 27
11 Buckie West and Mains of Buckie Buckie High School 1 860 6 12 1 17.2% 148 4.7% 41
12 Mosstodloch, Portgordon and seaward Buckie High School 2 489 7 11 -1 21.6% 106 1.3% 6
13 North Speyside Speyside High School 2 533 7 16 3 19.8% 106 0.5% 3
14 South Speyside and the Cabrach Speyside High School 2 628 6 10 -4 21.7% 136 -2.1% -13
15 New Elgin West Elgin High School 1 694 7 15 - 19.3% 134 1.5% 10
16 Lossiemouth East and Seatown Lossiemouth High School 1 454 7 17 1 22.3% 101 13.6% 62
17 Forres Central East and seaward Forres Academy 1 396 7 14 -3 19.3% 76 3.1% 12
18 Findhorn, Kinloss and Pluscarden Valley Forres Academy 2 675 7 18 - 27.2% 183 5.3% 36
19 Rural Keith and Strathisla Keith Grammar School 2 508 6 19 - 19.0% 96 -0.1% -1
20 Heldon West, Fogwatt to Inchberry Milne's High School 2 1234 6 23 3 16.2% 200 3.1% 38
21 Elgin Bishopmill West and Newfield Elgin Academy 1 588 7 22 1 17.2% 101 7.1% 42
22 Rafford, Dallas, Dyke to Dava Forres Academy 2 744 7 20 -2 16.4% 122 0.3% 2
23 Burghead, Roseisle and Laich Lossiemouth High School 2 844 8 21 -2 16.0% 135 -1.0% -9
24 Elgin Central West Elgin Academy 1 437 9 24 - 6.2% 27 -7.6% -33      
TOTALS 15,941       24.1% 3,849   470 
7 SIMD2020 ranks every Data Zone from Decile 1 to 10, with 1 having the highest levels of deprivation. An average is taken from the Data Zone total to provide an Intermediate Zone average.
8 Average urban / Rural figures within the table are a guide. As the data if factored from Data Zones into Intermediate Zones these, are rounded averages. Accurate figures for Urban / Rural divide are provided in Table 1
Page 102

Page 103

TABLE 3: SIMD2020 MORAY FROM A NATIONAL PERSPECTIVE
SIMD2020 provides a ranking for all of Scotland’s 6,976 Data Zones, allowing for comparisons with other Scottish Local
Authorities. Nationally, Moray is not seen as a deprived Local Authority as the majority of the population (51.8%) live
in the 40% least deprived areas. In comparison, Scotland has a smaller proportion (41.2%) living in the 40% least
deprived areas. The colour coding in the in Table 3 provides a visual of highs and lows (Red – Green).
From a national perspective, 7.8% of the 0-15 population in Moray live in the 30% most deprived (Deciles 1-3) areas,
yet 14.5% of all children in poverty live in these areas. In contrast, the 30% least deprived of areas (Deciles 8-10) have
almost four times more children but 16.2% of all children living in poverty, evidencing the strong linkages between
deprivation and poverty. Although poverty density is higher in the most deprived areas, the vast majority (85.5%) of
children in poverty live out with the most deprived areas. This would appear to beg the question as to whether it is
better to direct resources to areas with the highest need but with the smallest proportion of children in poverty or,
direct the same resources more widely to mitigate poverty for the vast majority of children. It doesn’t however show
what Moray looks like internally.
Table 3 -Population and child poverty by SIMD2020 Decile (National Rankings)
POPULATION DATA BY SIMD2020 DECILE (1= MOST DEPRIVED, 10= LEAST DEPRIVED)
SIMD
DECILE
% of
DATAZONES
% of
POPULATION
% of 0-15
(OVERALL)
population
% of 0-15
(DECILE)
population)
Estimated
number of
Children (0-15) in
Relative Child
Poverty 2021/22
% Estimated
Relative Child
Poverty by SIMD
Decile 2021/22
1 0.8% 0.7% 1.0% 24.8% 65 39.9%
2 2.4% 2.0% 2.2% 18.3% 166 47.3%
3 5.6% 4.6% 4.6% 16.5% 328 44.8%
4 11.1% 9.2% 10.1% 18.1% 585 36.3%
5 13.5% 14.1% 14.7% 17.3% 757 32.3%
6 18.3% 17.7% 16.7% 15.6% 647 24.4%
7 22.2% 20.7% 20.0% 16.0% 678 21.3%
8 14.3% 17.8% 17.7% 16.4% 436 15.5%
9 5.6% 6.4% 6.3% 16.3% 89 8.9%
10 6.3% 6.9% 6.8% 16.3% 99 9.1% 
TABLE 4: MORAY INTERNAL DEPRIVATION
The national perspective can only show how Moray compares with other areas in Scotland, it is not able to provide an
internal picture of Moray. Using the same approach as SIMD2020, but applying it internally to Moray’s 126 data zones,
provides a more accurate picture of deprivation within Moray.
By ranking each of Moray’s Data Zones from 1-126 they can be placed into ‘Moray’ Deciles (10% of Data Zones per
Decile), showing the internal deprivation of Moray. By doing so, in theory, it would be expected that 10% of the
population would live in each decile. Deciles 1-7 broadly follow this Population distribution, but err on the lower side,
whereas deciles 8-10 do not, they all have higher population levels than would be expected. The 0-15 population
follow a similar trend with a higher proportion living in the 30% least deprived in comparison to those in the 30% most
deprived. These two factors show that even internally, Moray is inclined to be less deprived. As with the national
perspective, the population density locally is weighted towards those in the 30% most deprived. Families living in the
most deprived areas are more likely to have more children and there is a higher likelihood of single parent families.
The most significant difference between the national and local perspective is the number of children estimated to be
living in poverty in the most deprived areas of Moray, these children are not evenly distributed within deciles. 48% of
all Moray children estimated to be living in poverty are living in the 30% most deprived of areas of Moray, in stark
contrast to the 14.5% identified by using the national SIMD ranking. Both the number and proportion of children
estimated to be living in poverty show a uniformed trend with more children and an increasing proportion living in
poverty as levels of deprivation increase. Contrary to the indication of ’whether it is better to direct resources to areas
Page 103

Page 104

with the highest need but with the smallest proportion of children in poverty or, direct the same resources more widely
to mitigate poverty for the vast majority of children.’ raised by analysis at a national perspective, the local perspective
analysis shows the justification to direct resources to the areas of highest deprivation, as this is where the greatest
impact of mitigating poverty can be made.
Table 4 - Moray Internal Deprivation
POPULATION DATA BY MORAY RANKING (1= MOST DEPRIVED, 10= LEAST DEPRIVED)
SIMD
DECILE
% of
DATAZONES
% of
POPULATION
% of 0-15
(OVERALL)
population
% of 0-15
(DECILE)
population)
Estimated
number of
Children (0-15) in
Relative Child
Poverty 2021/22
% Estimated
Relative Child
Poverty by Moray
Ranking 2021/22
1 10.0% 9.0% 10.4% 19.0% 758 45.7%
2 10.0% 9.3% 10.9% 19.3% 625 36.0%
3 10.0% 8.7% 8.6% 16.4% 463 33.7%
4 10.0% 8.8% 8.8% 16.5% 367 26.1%
5 10.0% 9.8% 9.1% 15.3% 407 28.1%
6 10.0% 10.0% 8.7% 14.5% 309 22.2%
7 10.0% 9.0% 9.2% 16.8% 284 19.4%
8 10.0% 12.8% 13.4% 17.3% 324 15.1%
9 10.0% 10.6% 9.1% 14.2% 186 12.8%
10 10.0% 11.9% 11.8% 16.4% 127 6.8%
Figure 1 shows the distribution of children living in poverty within Moray and the number of children in poverty in
each Moray decile.   There are almost three times more children in poverty living in the 30% (1,846) most deprived
areas than there are living in the 30% (637) least deprived. The linkages between deprivation and poverty are clear, as
Internal deprivation decreases so does proportionate poverty. This provides the strongest argument for directing
resources to mitigate the impact of poverty towards those areas of highest deprivation within Moray.
Figure 1 - Poverty & Internal Deprivation Relationship 
758
625
463
367 407
309 284 324
186 127
24.1%
45.7%
6.8%
0
100
200
300
400
500
600
700
800
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
50%
1 2 3 4 5 6 7 8 9 10
Poverty & Internal Deprivation Relationship
Estimated number of Children (0-15) in Relative Child Poverty 2021/22
Moray % Poverty
% Estimated Relative Child Poverty by Internal Deprivation 2021/22
Page 104

Page 105

FIGURES 2, 3 & 4: MORAY VS COMPARATOR AUTHORITIES
Figure 2 shows where Moray ranks in relation to its Comparator Authorities. In 2021/22 Moray ranks as the second
highest within our comparator group. This differs significantly from ranking sixth highest in 2014/15. None of our
comparator authorities have declined in nationwide ranking to the same extent as Moray over the period. East
Lothian has seen the largest change in ranking, from having the highest levels of poverty in 2014/15 it now has the
second lowest in the comparator group. What has happened in East Lothian that hasn’t happened in Moray? Stirling
had the lowest level of poverty in 2014/15 and still has the lowest levels within our comparator group.
Figure 2 - Moray vs Comparator Authorities (% Poverty) 
As Figure 3 shows, the year-to-year poverty trend is not uniformed, unpredictable external factors can have a huge
influence on levels, as can be seen from the dip in poverty during the pandemic (2020/21). As such Predicting/
Forecasting poverty levels are only estimates. The estimates shown in Figure 3 are based upon a 3-year rolling average
over the period from 2014-22 and projecting these averages forward to 2030. Factoring in these averages, estimated
levels in Moray in 2030 (25.6%) will be 3% higher than our comparator median. If the cost of living continues to rise, it
is likely that child poverty will rise at a rate greater than currently forecast. 
Ranking Scotland 24.5%
1 Angus 24.2%
2 Moray 24.1%
3 Scottish Borders 23.4%
4 Highland 22.8%
5 Midlothian 22.7%
6 Argyll & Bute 21.7%
7 East Lothian 21.1%
8 Stirling 20.8%
22.7% 22.6%
24.1%
25.6%
15%
17%
19%
21%
23%
25%
27%
29%
Poverty Forecast, based on 3-year average trend (2014/22)
Comparator Median Moray Comparator Predicted Forecast Moray Predicted Forecast
Figure 3 - Poverty Forecast 2022/23 - 2029/30 
Page 105

Page 106

Figure 4 shows how child poverty levels have changed between 2014 and 2022 within our comparator authority
group. Over this period child poverty in Moray has risen at a greater rate (3.2%) in comparison with the average rise
within our comparators (1.3%). The darker map colours highlight the extent of the rises for Moray and our comparator
authorities.
Figure 4 - Moray vs Comparator Authorities (Change in Poverty 2014-22) 
Ranking Scotland 2.9%
1 Moray 3.2%
2 Angus 2.5%
3 Scottish Borders 2.5%
4 Highland 1.4%
5 Stirling 1.2%
6 Argyll & Bute 1.1%
7 Midlothian 0.9%
8 East Lothian -0.8%
Page 106

Page 107

FIGURES 5 & 6: HOW DOES COMPARE WITH ALL SCOTTISH LOCAL AUTHORITIES
Poverty in Scotland varies significantly, comparator authorities are highlighted in blue within the supporting table.
One in three children in Glasgow city are in poverty compared with one in seven in East Renfrewshire, yet the two
authorities share a border. Moray, in 2021/22 is placed as having the 14th highest levels of child poverty of Scotland’s
32 Local Authorities, this is in stark contrast to being placed 20th in 2014/15. From having a rate 0.8% less than
Scotland in 2014/15 the difference has narrowed to 0.4% 2021/22. SIMD2020 data shows that in Moray 7.8% of the 0-
15 population live in the 30% most deprived areas of Scotland, nationally the figure is 26%.
Figure 5 - Moray vs All Scottish Local Authorities (% Poverty) 
Ranking Scotland 24.5%
1 Glasgow City 32.0%
2 North Ayrshire 29.0%
3 Clackmannanshire 28.3%
4 West Dunbartonshire 27.6%
5 East Ayrshire 27.2%
6 Dundee City 27.1%
7 North Lanarkshire 26.6%
8 Fife 26.1%
9 Dumfries and Galloway 26.0%
10 Falkirk 25.3%
11 South Ayrshire 24.4%
12 Inverclyde 24.4%
13 Angus 24.2%
14 Moray 24.1%
15 West Lothian 23.9%
16 Scottish Borders 23.4%
17 Renfrewshire 23.3%
18 South Lanarkshire 22.8%
19 Highland 22.8%
20 Midlothian 22.7%
21 Perth and Kinross 21.9%
22 Argyll and Bute 21.7%
23 East Lothian 21.1%
24 Stirling 20.8%
25 Aberdeen City 20.5%
26 Orkney Islands 20.1%
27 Western Isles 19.8%
28 City of Edinburgh 19.5%
29 Aberdeenshire 16.0%
30 Shetland Islands 15.4%
31 East Dunbartonshire 14.9%
32 East Renfrewshire 14.4%
Page 107

Page 108

Figure 6 shows how child poverty levels in Scotland have changed between 2014 and 2022 for Local Authorities.
Moray has witnessed the 8th highest increase over this period. With the exception of Dundee City all other authorities
with higher increases are within the central belt. 
CONCLUSION
Child poverty in Moray is on a rising trend and at 24.1% in 2021/22 is the highest level recorded between 2014 and
2022. In 2021/22, there was an estimated 3,849 children aged 0-15 living in ‘Relative Poverty’, an increase of
approximately 470 children from the previous year. Poverty is defined by available household income, if a child is in
poverty any adult in the household is also in poverty. If the Scottish average poverty proportions for working aged
adults and pensioners were to be applied to the population of Moray in 2021/22, there were an estimated 19,455
people living in poverty, 20.2% of the population. 
The ‘Bounce back’ from the initial COVID pandemic period (2020/21) is the likely cause of the significant increase
between 2020/21 and 2021/22, the largest annual rise recorded within the period. If this period were to be excluded
child poverty would show a more uniformed rising trend. Moving forward, the increase in the cost of living since
2021/22 is likely to have an impact in 2022/23 and 2023/24, so it would be no surprise if poverty levels in these years
exceed forecast levels. 
Ranking Scotland 2.9%
1 Glasgow City 4.9%
2 West Dunbartonshire 4.2%
3 North Ayrshire 4.2%
4 Clackmannanshire 4.1%
5 Renfrewshire 4.0%
6 Inverclyde 3.5%
7 Dundee City 3.3%
8 Moray 3.2%
9 Angus 3.1%
10 East Ayrshire 2.8%
11 North Lanarkshire 2.7%
12 Dumfries and Galloway 2.7%
13 Falkirk 2.7%
14 West Lothian 2.6%
15 Fife 2.5%
16 Scottish Borders 2.5%
17 Western Isles 2.3%
18 Shetland Islands 2.1%
19 Perth and Kinross 2.0%
20 South Ayrshire 1.8%
21 Aberdeen City 1.8%
22 Highland 1.4%
23 South Lanarkshire 1.3%
24 Stirling 1.2%
25 Argyll and Bute 1.1%
26 Midlothian 0.9%
27 City of Edinburgh 0.9%
28 Aberdeenshire 0.4%
29 Orkney Islands -0.2%
30 East Dunbartonshire -0.3%
31 East Renfrewshire -0.5%
32 East Lothian -0.8%
Figure 6 - Moray vs All Scottish Local Authorities (% Poverty) (Change in poverty 2014-22)
Page 108

Page 109

APPENDIX 1: DATA SOURCES 
NATIONAL SOURCES
1. National Records of Scotland (NRS): Mid-year population estimates by Data Zone, 2021
2. National Records of Scotland (NRS): Small area household estimates by Data Zone, 2021
3. Department of Work and Pensions (DWP) Stat-Xplore: Children living in Low Income Families, 2021/22
4. Department of Work and Pensions (DWP) Stat-Xplore: Carers Allowance, July 2023
5. Department of Work and Pensions (DWP) Stat-Xplore: Disability Living Allowance (DLA), July 2023
6. Department of Work and Pensions (DWP) Stat-Xplore: Personal Independence Payment (PIP), July 2023
7. Department of Work and Pensions (DWP) Stat-Xplore: Universal Credit, July 2023
8. Department of Work and Pensions (DWP) Stat-Xplore: Pension Credit, July 2023
9. Scottish Index of Multiple Deprivation (SIMD), 2020
10. End Child Poverty, 2021/22
11. Official Census and Labour Market Statistics (NOMIS), December 2023
LOCAL SOURCES (BENEFITS AND MONEY ADVICE SERVICE)
12. Council Tax Reduction (CTR), 2022/23
13. Housing Benefit (HB), 2022/23
14. Flexible Food Fund (FFF), 2022/23
15. Free School Meals (FSM) SEEMIS Snapshot, June 2023
16. MAMS Income Maximisation (IM), 2023/23
17. MAMS Money Advice (MA), 2022/23
18. MAMS Welfare Benefits (WB), 2022/23
19. Discretionary Housing Payments (DHP), 2022/23
20. Education Maintenance Allowance (EMA), 2022/23
21. Scottish Welfare Fund (SWF), 2022/23
22. Crisis Grants, 2022/23
23. Community Care Grants, 2022/23
24. Moray Food Plus, 2022/23 
Page 109

Page 110

Page 110

Page 111

1
CORPORATE POVERTY ACTIONS 
Report Type: Actions Report
Generated on: 02 August 2024 
Action Status 
Cancelled 
Overdue; Neglected 
Unassigned; Check Progress 
Not Started; In Progress; Assigned 
Completed 
1. REDUCE CHILD POVERTY AND INEQUALITIES IN ICOMES, HEALTH AND EDUCATION
Overall Plan Progress 
Action
Code Action Title Priority Desired Outcome Due Date Latest Status Update Progress Status
Icon
POVERTY-
CORP-MC Corporate MC Actions     31-Mar-
2029  7% 
Item 13.
Page 111

Page 112

2
2. CHILDREN'S SERVICES
2.1 What poverty looks like in Moray is understood by all 
Action
Code Action Title Priority Desired Outcome Due Date Latest Status Update Progress Status
Icon
PCSP23-
26-F-P01
Establish Data Set
(Partnership?)  
Dataset is informing improvement
activity.  
31-Mar-
2025  0% 
PCSP23-
26-F-P02 Monitor data (Partnership?)   Dataset is informing improvement
activity.  
31-Mar-
2026  0% 
2. CHILDREN'S SERVICES
2.2 Parents claim all of welfare benefits they are entitled to and do not feel stigmatised when seeking support. 
Action
Code Action Title Priority Desired Outcome Due Date Latest Status Update Progress Status
Icon
PCSP23-
26-F-P03
Map & Promote support
(Partnership?)  
1. Children, young people and parents
report they are aware of support
available and feel able to access it. 
2. Child Poverty Group and Locality
Network members can clearly articulate
the support available.  
31-Mar-
2026  0% 
PCSP23-
26-F-P04
Develop and implement a
financial inclusion pathway
(Partnership?)  
Increase in sign posting and referrals to
supports available.  
31-Mar-
2024  0% 
PCSP23-
26-F-P05
Evaluate impact of the
financial pathway
(Partnership?)  
Dip sample of family’s experience of
accessing support.  
31-Mar-
2026  0% 
PCSP23-
26-F-P06
Extend evaluation pathway
(Partnership?)  
Dip sample of family’s experience of
accessing support.  
31-Mar-
2026  0% 
PCSP23-
26-F-P08
Embed Income Maximisation
support (Partnership?)  
Families entitled to benefits will have a
financial gain to household income.  
31-Mar-
2026  0% 
Page 112

Page 113

3
2. CHILDREN'S SERVICES
2.3 The impact of poverty on children and young people is minimised whilst opportunities for wellbeing and attainment are maximised. 
Action
Code Action Title Priority Desired Outcome Due Date Latest Status Update Progress Status
Icon
PCSP23-
26-F-P16
Improve joint working
between Child Poverty Group
and Transport and Housing
Departments (Partnership?)  
Impact of improvement activity.   31-Mar-
2025  0% 
PCSP23-
26-F-P17
Build improvements into
revised transport and
housing policies and
strategies (Partnership?)  
Impact of improvement activity.   31-Mar-
2026  0% 
2. CHILDREN'S SERVICES
2.4 Young adults and parents experience no poverty related barriers to entering and sustaining learning, training and employment 
Action
Code Action Title Priority Desired Outcome Due Date Latest Status Update Progress Status
Icon
PCSP23-
26-F-P21
Further develop and upscale
affordable, wrap around
childcare throughout Moray
(Partnership?)  
1. Parental feedback and case studies on
the impact of School aged childcare 
2. Increase in household income  
31-Mar-
2026  0% 
3. ECONOMIC GROWTH AND DEVELOPMENT
Poverty Related Actions 
Action
Code Action Title Priority Desired Outcome Due Date Latest Status Update Progress Status
Icon
PEGD25-
4.3
Enable more people to work
by supporting access to
affordable childcare
1 Minimise barriers to people working such
as childcare  
31-Mar-
2025  0% 
Page 113

Page 114

4  Page 114

Page 115

5
4. EDUCATION
Poverty Related Actions 
Action
Code Action Title Priority Desired Outcome Due Date Latest Status Update Progress Status
Icon
PEDU
2024-25
STRA 1.1
Early intervention addressing
whole family well-being to
ensure that children can
reach their full potential
1
Planned Outcome - Improved attainment
at both Broad General and Senior Phase
identified through ACEL and LGBF
measures 
Outcome Measures - Literacy and
numeracy attainment gap (P1, P4 and P7
combined) – percentage point gap
between the least and most deprived
pupils (LGBF CHN14a / CHN14b)
(Corp.Plan) 
Percentage of P1, P4 and P7 pupils
combined achieving expected CFE level
in literacy and numeracy (LGBF CHN13a
/ CHN13b) (Corp Plan / Core Stretch
Aim)  
30-Jun-
2025  0% 
PEDU
2024-25
STRA 1.2
Getting it right for every child
so that we continue to
improve attainment for all
1
Planned Outcome - Improved attainment
at both Broad General and Senior Phase
identified through ACEL and LGBF
measures 
Outcome Measures - Percentage of
school leavers gaining 5+ awards at
levels 5 and 6 (LGBF CHN6 / CHN7)
(Corp Plan) 
Leavers achieving 1+ @ SCQF Level 5 /
Level 6 (Core Stretch Aim) 
Overall average total tariff (LGBF
CHN12a) (Corp Plan) 
Percentage of pupils entering positive
destinations (LGBF CHN11) 
(ASN leavers / LAC leavers) (Corp Plan) 
Annual Participation Measure (Core
Stretch Aim)  
30-Jun-
2025  0% 
Page 115

Page 116

6   Page 116

Page 117

7
5. EDUCATION RESOURCES AND COMMUNITIES
Poverty Related Actions 
Action
Code Action Title Priority Desired Outcome Due Date Latest Status Update Progress Status
Icon
PSERV
ERC 1.1
24-27
Youth Work staff deliver
targeted sessions in
partnership with school to
address health and wellbeing
issues and/or Employability
activities in S3.
2
1. Working together to make the biggest
difference to the outcomes for people in
Moray. 
2. Young people are more ready to enter
employment, training or college 
3. Young people participate in informal
learning programmes they have co-
designed and as a result have increased
attendance at school.  
31-Mar-
2026
Q1 2024/25 - Many Pathways groups have come to an end as
young people move into 4th year. Youth Work Team will
continue to engage with these young people through Core Youth
Work or the new Outreach youth workers and Employability
Youth Work Team who will join us for the start of Autumn term..
The Youth Work offer is changing to adapt to needs and will
focus more on Health and Wellbeing through work in schools
and community, this will encompass Pathways and Transition
work. 
Summer programme started in last week of this quarter with 35
yp from across Moray attending first 2 sessions. 
A total of 659 young people were involved with the team this
quarter with a total of 236 sessions being delivered in schools
and community.  
0% 
PSERV
ERC 1.2
24-27
Outreach youth workers are
employed in Buckie, Forres,
Keith and Elgin to pilot work
in school and in the
community with young
people who are not fully
engaged in learning.
2   31-Mar-
2026
Q1 2024/25 - Before recruiting for these posts, the service
had to fill a long-standing vacancy for a CLD Worker which was
successfully filled. The four Outreach Youth Workers have also
been recruited and will be in place before the new school term
starts. These posts will work closely with existing Youth Workers
and Youth Work partners to develop opportunities for young
people not engaging in education within their communities.  
0% 
PSERV
ERC 2 24-
27
Lead on the delivery of the
'Moray Multiply' programme 2
Learners are able to access learning
opportunities that improve their
confidence with numbers in everyday life
and within their workplace.  
31-Mar-
2025
Q1 2024/25 - Community Learning and Development (CLD)
have a total of 40 active learners in Multiply. A very successful
My Bank training course has helped with participants being
identified with lived experience of the care system and through
The Champions Board. The focus was on practical finance and
preparing for a tenancy. The five participants completed the
weeklong programme and secured a Level 4 Personal Finance
Award. 
UHI Moray figures (not included last quarter) show an increase
of 61 to a total number of 121 learners. Of these 20 have had
results confirmed and have achieved their qualification with a
further 101 results to be confirmed. 
63% 
Page 117

Page 118

8
The CSU worked with the charity National Numeracy to train
champions – people who work in public settings and who are
able to identify and support or signpost people who have low
confidence with numbers. 
Other partners like Enable, LEAD Scotland and the Salvation
Army are delivering individual and group sessions and funding
has been awarded to the Lossie 2-3 Group and Library service
to further widen the Multiply offer in Moray.  
PSERV
ERC 7.1
24-27
Embed the Changing Lives
approach across relevant
workstreams
2
1. Improved health, wellbeing and
resilience in our communities 
2. Young people have access to high
quality services that support their
learning, wellbeing and independence. 
3. Local residents can participate in sport
and culture opportunities to develop
their skills and confidence  
31-Mar-
2025
Q1 2024-25 – Changing Lives work in Q1 has prioritised
sessions for school pupils experiencing neurodiversity and
additional support needs, wellbeing and anti-social behaviour.
The Libraries team are also using the changing lives approach to
commence adult digital numeracy sessions.   63% 
6. GOVERNANCE, STRATEGY AND PERFORMANCE
Poverty Related Actions 
Action
Code Action Title Priority Desired Outcome Due Date Latest Status Update Progress Status
Icon
PGSP
2024-25
DT&E 1.4
Benefits / Money Advice:
Develop Benefits e-form 2
Planned Outcome - Service efficiency
savings. Improved customer service 
Outcome Measures - % of total
applications successfully completed
through e-form. Reduction in application
processing time.  
31-Dec-
2024  0% 
PGSP
2024-25
DT&E 1.5
Benefits / Money Advice:
Establish whether there is a
viable case for further
centralisation of means
testing
3
Planned Outcome - Determine whether a
staffing efficiency and maximisation of
council resources is achievable 
Outcome Measures - Completion of
business case  
31-Dec-
2024  0% 
Page 118

Page 119

9
7. HOUSING AND PROPERTY
Poverty Related Actions 
Action
Code Action Title Priority Desired Outcome Due Date Latest Status Update Progress Status
Icon
PHP25-4.1
Delivery of the Housing.
Investment and Affordable
Housing Supply programmes  
Increase in affordable housing available
in Moray  
31-Mar-
2025  0% 
Page 119

Page 120

Page 120

Page 121

Poverty Indicators 2023/2024 
Generated on: 05 August 2024 
PI Status 
Alert 
Warning 
OK 
Unknown 
Data Only 
Long Term Trends 
Improving 
No Change 
Getting Worse 
Short Term Trends 
Improving 
No Change 
Getting Worse 
2. CHILDREN'S SERVICES
2.1 What poverty looks like in Moray is understood by all 
Code Code Short Name Current
Target
2022/23 2023/24 2024/25 Q1
2023/24
Q2
2023/24
Q3
2023/24
Q4
2023/24
Q1
2024/25 Latest Note
Short
Term
Trend
Arrow
Status
Value Value Value Value Value Value Value Value
CHN24 Nat(b)
Proportion of children living
in poverty (after housing
costs)
23.1% 23.9% Not
Published
Not
Published Not measured for Quarters
Not
measured
for
Quarters
Moray- 23.9% (Ranked 16/32 Nationally and
2/8 within Comparator Group, where 1 denotes
the highest levels of poverty) 
Ranking Change Moray
2014/15 - 2022/23 = Ranking 6/8 to 2/8
(Decline, +3.1%) 
Item 13.
Page 121

Page 122

Code Code Short Name Current
Target
2022/23 2023/24 2024/25 Q1
2023/24
Q2
2023/24
Q3
2023/24
Q4
2023/24
Q1
2024/25 Latest Note
Short
Term
Trend
Arrow
Status
Value Value Value Value Value Value Value Value
2021/22 - 2022/23 = Ranking No Change,
(Improvement, -0.2%) 
Comparator Benchmarking Authorities: 
Angus – 24.9% 
Argyll & Bute – 23.5% 
East Lothian – 21.3% 
Highland – 23.3% 
Midlothian – 23.2% 
Scottish Borders – 23.6% 
Stirling – 20.8% 
Scotland - 21.8% 
Family Group Average 23.1 % 
POV1.0  Local
Difference between Highest
and Lowest Levels of
Estimated Poverty in Moray
(Intermediate Zones)
25% NA NA NA Not measured for Quarters
Not
measured
for
Quarters
Locally in Moray
Highest Intermediate Zone: Elgin Cathedral to
Ashgrove and Pinefield 40.2%
Lowest Intermediate Zone: Elgin Central West
6.2% 
Difference - 34% 
Nationally
Highest Levels (Local Authority): Glasgow 32.0% 
Lowest Level (Local Authority): East
Renfrewshire 14.4% 
Difference - 17.6% 
3. ECONOMIC GROWTH AND DEVELOPMENT
Poverty Related Indicators 
Code Code Short Name Current
Target
2022/23 2023/24 2024/25 Q1
2023/24
Q2
2023/24
Q3
2023/24
Q4
2023/24
Q1
2024/25 Latest Note
Short
Term
Trend
Arrow
Status
Value Value Value Value Value Value Value Value
ECON01 Nat(b)
% Unemployed People
Assisted into work from
Council operated / funded
Employability Programmes
14.1% 10.1% Not
Published
Not
Published Not measured for Quarters
Not
measured
for
Quarters
ECON01 2022-23 Percentage of Unemployed
People Assisted into work from Council
Programmes 
Moray 10.1% - Rank 24/32 
Angus - 8.4% 
Argyll & Bute - 13.1% 
East Lothian - 15.3% 
Page 122

Page 123

Code Code Short Name Current
Target
2022/23 2023/24 2024/25 Q1
2023/24
Q2
2023/24
Q3
2023/24
Q4
2023/24
Q1
2024/25 Latest Note
Short
Term
Trend
Arrow
Status
Value Value Value Value Value Value Value Value
Highland - 9.7% 
Midlothian - 23.9% 
Scottish Borders - 5.1% 
Stirling - 26.8% 
Scotland Average 12.9% 
Family Group Average - 14.1% 
ECON07 Nat(b)
SLAED-IG5 Proportion of
people earning less than the
living wage
12.8% 13.8% Not
Published
Not
Published Not measured for Quarters
Not
measured
for
Quarters
ECON07 2022-23 Proportion of people earning
less than the living wage 
Moray 13.8% - Rank 15/32 Nationally
Angus 14.5% 
Highland 8.2% 
Scottish Borders 14.5% 
Scotland Average 9.4% 
Family Group Average 12.8% 
ECON12
a Nat(b)
SLAED-OC6 Claimant count
as a % of working age
population
2.5% 2.4% 2.2% Not
Published Not measured for Quarters
Not
measured
for
Quarters
ECON12a 2023-24 Claimant Count as a % of
Working Age Population 
Moray 2.1% - Rank 6/32
Angus - 2.7% 
Argyll & Bute - 2.6% 
East Lothian - 2.4% 
Highland - 2.2% 
Midlothian - 2.2% 
Scottish Borders - 3.0% 
Stirling - 2.4% 
Scotland Average - 3.1% 
Family Group Average - 2.5% 
ECON12
b Nat(b) Claimant count as a % of
16-24 population 2.9% 3.5% 2.6% 2.4% Not measured for Quarters
Not
measured
for
Quarters
ECON12b 2023-24 Claimant Count as % of 16-
24 Population 
Moray 2.4% - Rank 9/32
Angus - 4.2% 
Argyll & Bute - 2.8% 
East Lothian - 3.0% 
Highland - 2.3% 
Midlothian - 3.0% 
Scottish Borders - 3.4% 
Stirling - 2.5% 
Scotland Average - 3.5% 
Page 123

Page 124

Code Code Short Name Current
Target
2022/23 2023/24 2024/25 Q1
2023/24
Q2
2023/24
Q3
2023/24
Q4
2023/24
Q1
2024/25 Latest Note
Short
Term
Trend
Arrow
Status
Value Value Value Value Value Value Value Value
Family Group Average - 2.9% 
ENVDV2
70 Local
Number of parents
registered for assistance
through Employability
Partnership
Data
Only  N/A 145 NA     
Data supplied by Progress for Parents project
officer (Emma Sharpe) who notes the figure can
only include parents registered as 'Single Parent'
or 'Children Couple' on the system.     
4. EDUCATION
Poverty Related Indicators 
Code Code Short Name Current
Target
2022/23 2023/24 2024/25 Q1
2023/24
Q2
2023/24
Q3
2023/24
Q4
2023/24
Q1
2024/25 Latest Note
Short
Term
Trend
Arrow
Status
Value Value Value Value Value Value Value Value
CHN6 Nat(b)
% of pupils from the 20%
most deprived dreas gaining
5+ Awards at Level 5 (SIMD)
Data
Only  N/A Not
Published
Not
Published Not measured for Quarters
Not
measured
for
Quarters   
CHN7 Nat(b)
% of pupils from the 20%
most deprived areas gaining
5+ Awards at Level 6 (SIMD)
Data
Only  12% Not
Published
Not
Published Not measured for Quarters
Not
measured
for
Quarters
% of Pupils from 20% most Deprived Areas
Gaining 5+ Awards at Level 6 (SIMD) 
MORAY - 12% (Ranked 26th) 
National - 22% 
Benchmarking Family Group - 15% 
Comparator Local Authorities - 
Angus - 16% 
Argyll & Bute - 15% 
East Lothian - 10% 
Highland - 13% 
Midlothian - 22% 
Scottish Borders - 14% 
Stirling - 19%    
CHN11 Nat(b) Proportion of pupils entering
Positive Destinations 95.3% 95.1% Not
Published
Not
Published Not measured for Quarters
Not
measured
for
Quarters
Proportion of pupils entering positive
destinations: 
MORAY - 95.1% (Ranked 22nd) 
Scotland - 95.9% 
Benchmarking Family Group - 95.3% 
Comparator Local Authorities - 
Angus - 94.4% 
Argyll & Bute - 95.1% 
Page 124

Page 125

Code Code Short Name Current
Target
2022/23 2023/24 2024/25 Q1
2023/24
Q2
2023/24
Q3
2023/24
Q4
2023/24
Q1
2024/25 Latest Note
Short
Term
Trend
Arrow
Status
Value Value Value Value Value Value Value Value
East Lothian - 96.3% 
Highland - 95.3% 
Midlothian - 95.3% 
Scottish Borders - 96.8% 
Stirling - 94.3%  
CHN12b Nat(b) Average Total Tariff SIMD
Quintile 1 541 561 Not
Published
Not
Published Not measured for Quarters
Not
measured
for
Quarters
Average Total Tariff SIMD Quintile 1: 
Moray - 561 (Rank 21st) 
Scotland - 658
Benchmarking Family Group - 541 
Comparator Benchmarking Authorities: 
Angus - 538 
Argyll & Bute - 589 
East Lothian - 492 
Highland - 480 
Midlothian - 590 
Scottish Borders - 498 
Stirling - 581    
CHN12c Nat(b) Average Total Tariff SIMD
Quintile 2 681 580 Not
Published
Not
Published Not measured for Quarters
Not
measured
for
Quarters
Average Total Tariff SIMD Quintile 2: 
Moray - 580 (Rank 31st) 
Scotland - 781
Benchmarking Family Group - 681 
Comparator Benchmarking Authorities: 
Angus - 645 
Argyll & Bute - 728 
East Lothian - 697 
Highland - 673 
Midlothian - 688 
Scottish Borders - 721 
Stirling - 715    
CHN14a Nat(b)
Literacy Attainment Gap
(P1,4,7 Combined) -
percentage point gap
between the least deprived
and most deprived pupils
Data
Only 32.1 Not
Published
Not
Published Not measured for Quarters
Not
measured
for
Quarters
Literacy Attainment Gap (P1,4,7 Combined) -
percentage point gap between the least and
most deprived pupils: 
Moray 32.1 (Rank 29th) 
Scotland - 20.5 
Benchmarking Family Group - 23.7 
Comparator Benchmarking Authorities: 
Angus - 21.8 
Argyll & Bute - 12.9 
East Lothian - 23.3 
Highland - 23.8 
Midlothian - 21.2 
Scottish Borders - 30.6 
Page 125

Page 126

Code Code Short Name Current
Target
2022/23 2023/24 2024/25 Q1
2023/24
Q2
2023/24
Q3
2023/24
Q4
2023/24
Q1
2024/25 Latest Note
Short
Term
Trend
Arrow
Status
Value Value Value Value Value Value Value Value
Stirling - 23.8  
CHN14b Nat(b)
Numeracy Attainment Gap
(P1,4,7 Combined) -
percentage point gap
between the least deprived
and most deprived pupils 
Data
Only 26.6 Not
Published
Not
Published Not measured for Quarters
Not
measured
for
Quarters
Numeracy Attainment Gap (P1,4,7 Combined) -
percentage point gap between the least and
most deprived pupils: 
Moray - 26.6 (Rank 28th) 
Scotland - 17.0 
Benchmarking Family Group - 20.3 
Comparator Benchmarking Authorities: 
Angus - 13.5 
Argyll & Bute - 14.7 
East Lothian - 23.6 
Highland - 21.1 
Midlothian - 14.6 
Scottish Borders - 31.4 
Stirling - 16.6     
5. EDUCATION RESOURCES AND COMMUNITIES
Poverty Related Indicators 
Code Code Short Name Current
Target
2022/23 2023/24 2024/25 Q1
2023/24
Q2
2023/24
Q3
2023/24
Q4
2023/24
Q1
2024/25 Latest Note
Short
Term
Trend
Arrow
Status
Value Value Value Value Value Value Value Value
ERC021a Local
Number of participants
involved in Changing Lives
Programme
148 489 494 273 29 118 148 199 273
Significant increase in Q1 due to additional
funding received which resulted in increased
volume of partnership work focused on positive
behaviours of young people across Moray    
ERC021 Local
% Increase in number of
participants in Changing
Lives programmes
20% 171% 1% 220% -76% -3% 21% 53% 220%
Target set at 148 participants/quarter
representative of 10% increase on target set in
2023/24. 
In quarter 1, 273 participants were involved in
the programme,showing a 220% increase based
on average quarterly figure (124) recorded in
2023/24.    
ERC034 Local
% increase in number of
Multiply learners recorded in
the Management Information
System (Hanlon). 
25% NA 78.6% 438% 0% 7% 66% 78.6% 438%
% Increase = 438% - Although this figure
is high it is a s a result of the long lead in
time to develop projects with learners – so
low numbers had been reported previously.  
Page 126

Page 127

Code Code Short Name Current
Target
2022/23 2023/24 2024/25 Q1
2023/24
Q2
2023/24
Q3
2023/24
Q4
2023/24
Q1
2024/25 Latest Note
Short
Term
Trend
Arrow
Status
Value Value Value Value Value Value Value Value 
Previous Total recorded = 36 
This Quarter – 194 
CLD Numeracy learners have increased to 40 this
quarter. 
UHI Moray figures (not included last quarter)
show an increase of 61 to a total number of 121
learners. Of these 20 have had results confirmed
and have achieved their qualification with a
further 101 results to be confirmed. 
LEAD Scotland have worked with 70 learners in
drop in sessions with 6 taking part in longer term
coursework. ( the 6 have been included in the
overall total only) Their approach of applying
Numeracy to everyday life skills for their learners
includes practical things such as understanding
and being able to use bus timetables to support
independent travel 
Enable have worked with 14 new learners this
quarter – 9 of whom have achieved a Level 1
qualification. 
14 Numeracy champions have been trained with
National Numeracy. These people are not maths
experts but people whose work with the public  
ERC035 Local
Number of learners
achieving a numeracy
qualification.  
10 NA NA NA Not measured for Quarters
Not
measured
for
Quarters
This data will not become available until later in
2024.    
ERC037 Local
% of Multiply learners report
increased confidence in
relation to numeracy
90% NA NA NA Not measured for Quarters
Not
measured
for
Quarters
The full data set will not be available until later in
2024 when information has been gathered from
all partners involved.    
ERC056a MI
Number of young people
accessing Active Schools
activities in receipt of free
school meals (Quarterly)
Data
Only NA NA       New Indicator for 2024/25   
6. GOVERNANCE, STRATEGY AND PERFORMANCE
Page 127

Page 128

Poverty Related Indicators 
Code Code Short Name Current
Target
2022/23 2023/24 2024/25 Q1
2023/24
Q2
2023/24
Q3
2023/24
Q4
2023/24
Q1
2024/25 Latest Note
Short
Term
Trend
Arrow
Status
Value Value Value Value Value Value Value Value
ENVDV2
81 Local
Scottish Welfare Funds -
amount allocated
(cumulative)
Data
Only 
£644,121
.00
£515,076
.00
£84,783.
00
£163,645
.00
£338,932
.00
£443,579
.00
£515,076
.00
£84,783.
00   
ENVDV2
81a Local
Scottish Welfare Funds -
percentage of application
awards 
Data
Only 63.3% 63.4% 63.2% 67.5% 67.2% 61.8% 57% 63.2%   
ENVDV2
82 Local
Discretionary Housing
Payments - value awarded in
year (cumulative)
Data
Only 
£628,647
.00
£741,789
.00
£799,233
.00
£643,798
.00
£701,844
.00
£709,205
.00
£741,789
.00
£799,233
.00   
CORP9 Nat(b) % of Crisis Grant Decisions
within 1 day 95.4% 97.8% 97.5% Not
Published Not measured for Quarters
Not
measured
for
Quarters
% of Crisis Grant Decisions within 1 Day
(2023/24)
Moray – 97.3% (Rank 15th) 
Scotland - 93.0%  
Comparator Benchmarking Authorities: 
Angus – 97% 
Argyll & Bute – 100% 
East Lothian - 88% 
Highland - 97% 
Midlothian - 99% 
Scottish Borders - 96% 
Stirling - 88% 
Benchmarking Family Average – 95.3% (target)    
CORP10 Nat(b) % of CCG Decisions within
15 day 92.5% 89.3% 99% Not
Published Not measured for Quarters
Not
measured
for
Quarters
% of CCG Decisions within 15 Day (2023/24)
Moray - 99% (Rank 10th) 
Scotland - 91%  
Comparator Benchmarking Authorities: 
Angus – 83% 
Argyll & Bute – 100% 
East Lothian - 100% 
Highland - 98% 
Midlothian - 99% 
Scottish Borders - 93% 
Stirling - 68% 
Benchmarking Family Average – 92.5%    
CORP11 Nat(b) The proportion of Scottish
Welfare Fund Budget Spent 115.2% 123.92% Not
Published
Not
Published Not measured for Quarters
Not
measured
for
Quarters
The proportion of SWF Budget Spent (2022/23)
Moray – 123.9% (Rank 19th) 
Scotland - 130%    
Page 128

Page 129

Code Code Short Name Current
Target
2022/23 2023/24 2024/25 Q1
2023/24
Q2
2023/24
Q3
2023/24
Q4
2023/24
Q1
2024/25 Latest Note
Short
Term
Trend
Arrow
Status
Value Value Value Value Value Value Value Value
Comparator Benchmarking Authorities: 
Angus – 86.5% 
Argyll & Bute – 127.7% 
East Lothian - 191% 
Highland – 44.2% 
Midlothian – 106.7% 
Scottish Borders – 102.8% 
Stirling – 153.2% 
Benchmarking Family Average – 117%  
CORP12 Nat(b)
Proportion of Discretionary
Housing Payment Funding
Spent
82.3% 79.77% Not
Published
Not
Published Not measured for Quarters
Not
measured
for
Quarters
The proportion of DHP Funding Spent 
Moray – 79.8% (Rank 28th) 
Scotland – 94.4%  
Comparator Benchmarking Authorities: 
Angus – 70.8% 
Argyll & Bute – 76.8% 
East Lothian – 81.1% 
Highland – 92.9% 
Midlothian – 87.3% 
Scottish Borders – 84.9% 
Stirling – 84.7% 
Benchmarking Family Average – 82.3%    
CPS070 MI
Number of pupils in receipt
of Free School Meals
(benefits criteria)
Data
Only  NA 1,436 1,378 1,338 1,471 1,411 1,436 1,378   
CPS071 MI
Number of pupils awarded
an Educational Clothing
Grant
Data
Only  1,519 1,578 1,193 1,163 1,443 1,531 1,578 1,193 Total awarded as at 30-06-2024 (697
households)    
CPS072 MI
Number of pupils awarded
Educational Maintenance
Allowance
Data
Only  166 148 10 0 74 117 148 10   
ENVDV3
01 MI Number of new Money
Advice Cases
Data
Only  241 255 62 72 76 48 59 62   
7. HOUSING AND PROPERTY
Poverty Related Indicators 
Page 129

Page 130

Code Code Short Name Current
Target
2022/23 2023/24 2024/25 Q1
2023/24
Q2
2023/24
Q3
2023/24
Q4
2023/24
Q1
2024/25 Latest Note
Short
Term
Trend
Arrow
Status
Value Value Value Value Value Value Value Value
HSN05a Nat(b)
Proportion of Council
dwellings that are energy
efficient
67% 62.1% 65.05% NA Not measured for Quarters
Not
measured
for
Quarters   
H1.10a Local
Number of affordable
housing completions at end
of current FY
32 146 111 NA Not measured for Quarters
Not
measured
for
Quarters
Clarification from Service that this is completions
by all social housing developers not just TMC.
Figures for 2024/25 will be availabe towards end
of FY or beginning of next.    
H1.10b Local
Number of site starts for
affordable housing in current
FY
100 NA NA NA Not measured for Quarters
Not
measured
for
Quarters
Clarification from Service that this is site starts
by all social housing developers not just TMC.
Figures for 2024/25 will be availabe towards end
of FY or beginning of next.     
Page 130

Page 131

REPORT TO: CORPORATE COMMITTEE ON 27 AUGUST 2024 
SUBJECT: MORAY BRITISH SIGN LANGUAGE (BSL) PLAN 2024-2030 
BY:  DEPUTE CHIEF EXECUTIVE EDUCATION, COMMUNITIES AND
OCCUPATIONAL DEVELOPMENT 
1. REASON FOR REPORT 
1.1 The Committee is invited to note the feedback from the consultation on the
draft Moray British Sign Language (BSL) plan and consider and approve the
amended Moray (BSL) Plan 2024-2030 (Appendix 1). 
1.2 This report is submitted to Committee in terms of Section III (B) (41) of the 
Council's Scheme of Administration relating to Council wide policy, strategies, 
priorities and objectives in relation to cross cutting issues which do not fall 
within the remit of service committees such as equalities, poverty, armed 
forces, Brexit, immigration. 
2. RECOMMENDATION 
2.1 The Committee is invited to: - 
(i)  note feedback from the consultation on the draft Moray BSL plan;
and 
(ii)  consider and approve the Moray British Sign Language    
(BSL)  Plan 2024-2030 (Appendix 1). 
3. BACKGROUND 
3.1 BSL is a recognised language and is the first and preferred language of many
deaf people in the UK. There is a distinction between those with a hearing
loss who communicate in ways other than through BSL, referred to as ‘deaf’
with a small d. Those people who identify culturally as being deaf and part of
the Deaf community are referred to as ‘Deaf’ with a capital D. When reference
is made to both groups the term D/deaf is used. 
3.2 British Sign Language is a language in its own right, with its own grammar.
For many D/deaf people it is their first language. This means that most written
information from Moray Council is difficult for D/deaf people to understand.
BSL is also different from communication supports such as Makaton. Such
supports are aimed at hearing people who have communication or learning
Item 14.
Page 131

Page 132

difficulties. But Makaton is not compatible to BSL and should not be seen as a
stepping stone towards learning BSL. 
3.3  The British Sign Language (Scotland) Act 2015 came into force in October
2015. The Act promotes the use of BSL in Scotland, primarily by requiring
public bodies in Scotland to develop BSL plans that outline how they will
promote and raise awareness of the language. 
3.4 Moray Council’s first BSL plan was approved by full Council on 31 October
2018 (para 7 of the Minute refers). In a national first, the agenda item was
supported by BSL interpretation. The period of the Plan covered the Covid
pandemic and this had a major impact on engagement with D/deaf people in
Moray and on the implementation of the various actions in the plan. 
3.5 The Committee approved the draft Moray BSL plan for consultation on 23
April 2024 (para 11 of the Minute refers). The Plan was published on social
media and a BSL version was also published, albeit subject to an extension to
the closure date due to delays in finding a BSL user to sign the plan and
technical issues. 
3.6 Feedback raised the following issues, which have been incorporated in the
Plan:
• Many D/deaf BSL users struggle with written communications and
need access to interpretation in order to understand these. therefore
promotion the use of video-relay interpretation through Contact
Scotland will be progressed. This service is free of charge to D/deaf
BSL users.
• Meeting the demand for BSL lessons has been difficult therefore liaison
between Moray Council, Moray College and North East Sensory
Services will take place to explore how this demand can be met over
the next 5 years. 
3.7 Actions will be incorporated in routine service performance monitoring 
arrangements to gather progress updates. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The BSL plan will assist Moray Council in promoting its values of
Fairness and Responsiveness. 
(b) Policy and Legal
The BSL Plan for Moray is a legal requirement under the British Sign
Language (Scotland) Act 2015. 
The BSL Plan for Moray will also assist in the Scottish Government’s
extension of the Public Sector Equality Duty due to come into force in
2025. The extension will impose a duty of inclusive communication upon
local authorities. 
Page 132

Page 133

(c) Financial implications
There are no financial implications to the report. 
(d) Risk Implications
There are no risks associated with the BSL Plan. 
(e) Staffing Implications
Accommodations to enable D/deaf people to access Moray Council
services and information will be made with existing staffing levels. 
(f) Property
There are no implications for property arising from this report. 
(g) Equalities/Socio Economic Impact
An Integrated Impact Assessment is attached in Appendix 2. 
(h) Climate Change and Biodiversity Impacts
None 
(i) Consultations
D/deaf people in Moray, Moray Council’s Public Transport Unit and
Sensory Educational Services have been consulted and their input has
been incorporated in the report. 
5. CONCLUSION 
5.1 That the Committee considers feedback on the draft Moray British Sign
Language Plan and approves the 2024-2030 Plan. 
Author of Report: Alasdair McEachan, Head of Governance, Strategy and
Performance
Background Papers: 
Ref:    SPMAN-2045703626-439  
SPMAN-2045703626-440 
Page 133

Page 134

Page 134

Page 135

APPENDIX 1 
1
Moray British Sign Language (BSL) Plan
2024-2030 
Item 14.
Page 135

Page 136

APPENDIX 1 
2
Contents 
Introduction ............................................................................................................. 3
1. BSL Accessibility ................................................................................................. 5
2. Children and families ........................................................................................... 6
3. Access to Employment ........................................................................................ 6
4. Access to Services .............................................................................................. 7
5. Celebrating BSL culture ...................................................................................... 7
6. Transport ............................................................................................................. 8 
Page 136

Page 137

APPENDIX 1 
3
Introduction 
The Scottish Government aims to make Scotland the best place in the
world for BSL users to live, work, visit and learn. BSL users refer to
people who are D/deaf and/or D/deafblind whose first or preferred
language is British Sign Language (BSL). 
The British Sign Language (Scotland) Act 2015 came into force in
October 2015. The BSL (Scotland) Act promotes the use of BSL in
Scotland, primarily by requiring public bodies in Scotland to develop BSL
plans that outline how they will promote and raise awareness of the
language. 
The first National British Sign Language (BSL) Plan 2017-2023 was
published in October 2017. The National Plan is made up of 10 long
term goals covering early years and education; training and work; health,
mental health and well bring; transport; culture and arts; justice and
democracy. It also described 70 actions to make progress towards these
goals.
The second National British Sign Language (BSL) Plan 2023-2029 was
published in November 2023. It is a six-year plan that represent the
ongoing commitment to making Scotland the best place in the world for
BSL users to live, work, visit and learn. It focuses on ten priority areas
with emphasis on children, young people and their families, health and
well-being, celebrating D/deaf culture and tackling accessibility for BSL
users that impacts on a number of areas such as transport, democratic
participation and access to justice. The delivery of these actions will lead
to improved equality, opportunities and outcomes for BSL users. The
national plan can be found at https://www.gov.scot/publications/bsl-
national-plan-2023-2029/. 
Page 137

Page 138

APPENDIX 1 
4
This is the second BSL plan for Moray. After consultation with BSL users
in Moray, the plan is less ambitious than the first one and is focusing on
improving engagement between the D/deaf community, Moray Council
and the wider community. The plan is less about strategic objectives,
and more about everyday experiences for D/deaf people. It is about
small steps we can take to support a dialogue with the D/deaf
community, despite the shortage of BSL interpreters in the area.
It is also our intention to add to the plan over the next 5 years in
response to this engagement.
The context for Moray’s BSL plan is challenging: There are no BSL
interpreters in Moray. The nearest are in Inverness or Aberdeen. Last
year, Moray Council invited 4 interpreters for a local framework bid and
only 2 replied. 
According to census there were around 260 BSL users in Moray. It is not
certain how many of these are D/deaf. What we do know is that it is a
mixed group with various needs. A mixed group with various aspirations. 
It is difficult to capture this in one plan. This is why the plan focuses on
continuous engagement.
We know we have D/deaf BSL users of all ages. Some of these are well
used to information technology. Others are struggling to use this, even
when this can give them access to assistive technology such as Contact
Scotland.
We know we have hearing parents of D/deaf children as well as D/deaf
parents of hearing children. Parents and children from all these groups
have different issues that can make access to services difficult.
We hope that this BSL plan and the engagement that is a result of it will
help overcome some of these problems. 
Page 138

Page 139

APPENDIX 1 
5
The draft plan was presented to Moray Council’s Corporate Committee
on 23 April 2024. It was then shared with the D/deaf and wider
community for consultation. The consultation ended on 30 June 2024.
Comments received during the consultation have been incorporated into
the plan.
1. BSL Accessibility
Moray Council shares the Scottish Government’s recognition that for
public services to be truly accessible for BSL users, there should be
awareness around the culture of BSL, providing vital information in BSL,
and enabling people to access services using their own language. 
Following discussions with BSL users in Moray, the following issues
were put forward to be included in the BSL plan:
• Develop an effective 2-way communication between BSL users
and Moray Council contact centre
• Ensure that BSL users can access Moray Council’s emergency
telephone numbers effectively
• Develop ways in which BSL users can be involved in public
consultations, especially concerning
o New developments as part of Moray Growth Deal
o Budget consultations
• During the consultation it became clear that many BSL users
struggle with written English. This means that they often need BSL
interpretation for communications from Moray Council or the NHS.
There is a video relay service from Contact Scotland which is
available free of charge to BSL users which will be promoted
across services and to BSL users in Moray.
• The consultation also highlighted the demand for BSL training
among council officers and the general public. Moray Council to
Page 139

Page 140

APPENDIX 1 
6
liaise with Moray College and North East Sensory Services to
explore how demand can be met over the next 5 years.
2. Children and families
A small number of Schools (2 primary and 2 secondary) in Moray have
adopted the BSL learning toolkit developed by Highlands. At present,
BSL is offered as an elective but has not been offered as part of the 1+2
programme in schools. 
There is evidence that in the early years provision, Makaton is often
used as a substitute for BSL. It is important to make a clear distinction
between the 2. BSL is a language in its own right. Makaton is a
communication aide for hearing people with learning disabilities.
Although there are similarities, the two do not complement each other
and Makaton can become a barrier to D/deaf people’s BSL language
acquisition.  Over the next 5 years Moray Council will:
• Promote inclusion of BSL in 1+2 programme in schools.
• Make professionals aware of the distinction between Makaton and
BSL.
• Ensure that D/deaf parents have access to information regarding
their child’s progress in school.
• Support hearing families of D/deaf children to learn BSL.
3. Access to Employment
Not all D/deaf people see themselves as disabled. However, D/deafness
is widely seen as a disability as defined by the Equality Act 2010. The
RNID reports that:
- D/deaf people and people with hearing loss are less likely to  be
employed than the general population.
Page 140

Page 141

APPENDIX 1 
7
- Only 37% of people who report BSL as their main language are
working, in comparison to 77% of people who are not disabled under
the Equality Act. 
In order to support D/deaf BSL users in accessing employment:
• Moray Council will ensure that reasonable adjustments are in
place to enable D/deaf people to gain fair access to job
opportunities with the Council.
4. Access to Services
As a local authority, Moray Council has a duty to make reasonable
adjustments to ensure that D/deaf people have access to our services
and information.  Some of the adjustments that can be made are free of
charge. But staff need to be aware that these exist. To promote access
for D/deaf BSL users in Moray, we will:
• Moray Council will promote D/deaf awareness training and BSL
training among its Health and Social Care staff.
• Moray Council will promote the use of the full range of assistive
technology to enable D/deaf people to have access to health and
social care services.
5. Celebrating BSL culture
D/deaf people in Moray told us that before lockdown, they would
travel to Inverness once a year to attend a show that had live BSL
interpretation. Since lockdown, they feel they have become more
isolated.  Current developments in Moray, especially around the
development of the cultural quarter, offer a great opportunity to help
D/deaf people out of their isolation.
• Moray Council will support D/deaf in taking part in social and
cultural activities in Moray. More specifically Moray Council will
Page 141

Page 142

APPENDIX 1 
8
o Encourage D/deaf people to engage in consultations around
the implementation of the Moray Growth Deal such as the
Cultural Quarter, Bus revolution and the STEM Centre
Network.
6. Transport
Moray is a predominantly a rural area. Public transport is a vital
element in tackling rural isolation. Moray’s M.Connect service is a
demand-led public transport service which can play an important role
in helping D/deaf people gaining access to all types of services. Over
the next 6 years Moray Council will work on the following action:
• Moray Council’s will engage with D/deaf people in Moray to
explore how its booking system can be made more accessible to
D/deaf people.
Page 142

Page 143

REPORT TO: CORPORATE COMMITTEE ON 27 AUGUST 2024 
SUBJECT: REVIEW OF SECOND TIER GOVERNANCE DOCUMENTS 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To note progress on the review of the Council’s Second Tier Governance
documents. 
1.2 This report is submitted to Committee in terms of Section II (19) of the
Council's Scheme of Administration, relating to any policy matter which does
not fall within the terms of reference of any Committee. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee: 
(i) approve the Guidance on Councillor Officer Relations attached as
Appendix 1; 
(ii) approve the Guidance for councillors on outside bodies attached
as Appendix 2; and 
(ii)  note progress on the update of the Council’s Second Tier
Governance Documents as detailed in paragraph 4.5. 
3. BACKGROUND 
3.1 The Council’s primary governance documents (described as the Constitutional
Documents) comprise: 
• Standing Orders
• Scheme of Administration
• Scheme of Delegation
• Financial Regulations
• Integration Joint Board scheme 
3.2 Following the Committee Governance Review in 2022/23 it was noted that
there is a tier of documents relating to the administration of Council business
which sits below the level of the constitutional documents. For simplicity these
are referred to as the Council’s Second Tier Governance Documents. 
Item 15.
Page 143

Page 144

3.3 A programme of review of the Council’s Second Tier Governance Documents
was approved by the Council on 23 August 2023 (para 11 of the refers) 
3.4 The documents identified as highest priority for review were: 
o Budget setting protocol 
o Guidance on Multi member wards
o Protocol on consultation, access to information and councillor
involvement in Council business. 
o Guidance of councillors on outside bodies. 
3.5 The Budget Setting Protocol was updated as part of the budget setting
process in February 2024. Proposals are set out below to replace the
remaining priority documents and to note progress on review of the Second
Tier Governance Documents accordingly. 
4. PROPOSALS 
Guidance on Councillor/Officer Relations
4.1 It is proposed that the Committee approve the “Guidance on Councillor/Officer
relations” attached as Appendix 1 to this report.  This Guidance combines the
previous “Guidance on Multi-Members Wards” and “Protocol on Consultation
etc.” detailed in paragraph 3.5 above. 
4.2 This new Guidance document describes the complementary roles of
councillors and officers and gives further detail on areas of frequent
interaction including: 
o Strategic and operation distinctions.
o Officer support and advice for councillors
o Councillors access to information  
o Multi-member ward issues
o Media relations   
Guidance for Councillors on Outside Bodies
4.3 It is proposed that the Council approve the “Guidance for Councillors on
Outside Bodies” attached as Appendix 2 to this report   
4.4 This document is broadly similar to the previous version but has been updated
to reflect the revised declaration requirements contained within the updated
Code of Conduct for Councillors which was published by the Standards
Commission in December 2021. 
4.5 In terms of the programme of review of the Second Tier Governance
documents referred to in paragraph 3.4 the status of documents prioritise for
review is: 
Page 144

Page 145

Approved/pending approval: 
Document  Approved Due for review
Remote Meetings Protocol  June 2022 June 2027
Guide to scrutiny at Moray Council  December
2022
December
2027
Notice of Motion flowchart and template  August 2023 August 2027
Council roles and responsibilities  September
2022
August 2027
Budget setting protocol  February 2024 February 2025
Guidance on councillor officer relations  August 2024 August 2029
Guidance for councillors on outside
bodies
August 2024 August 2029 
To be reviewed: 
Document  Approved  Aim to review
Protocol on flag flying Council buildings
and war memorials 
June 2013 December
2024
Guidance on MSP/MP visits to Council
buildings 
August 2013 December
2024
Political group recognition and the
strategic leadership forum
n/a December
2024 
4.6 Updated Second Tier Governance Documents along with the Constitutional
Documents have been uploaded into the Public Documents section on the
Committee Management Information System (CMIS) for ease of reference. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Having clear governance arrangements helps provide an environment 
for the Council to move forward with its corporate priorities. 
(b) Policy and Legal
The status of the Council’s Second Tier Governance Documents is
outlined at paragraph 3.2 above. 
(c) Financial implications
Having clear governance arrangements helps provide an environment 
for the Council to move forward with its financial priorities. 
Page 145

Page 146

(d) Risk Implications
The Second Tier Governance Documents help mitigate governance risks
by providing clarity over a number areas where tensions or
misunderstandings can arise: 
• Roles and responsibilities of members and officers 
• Smooth running of meetings
• Access to information 
(e) Staffing Implications
Review of the Council’s Second Tier Governance Documents is a
significant piece of work which is being undertaken alongside competing
priorities.  Timescales are indicative and regular updates will be given to
members via the service planning reporting process. 
(f) Property implications
None 
(g) Equalities/Socio Economic Impact
No direct impact 
(h) Climate Change and Biodiversity Impacts
No direct impact. 
(i) Consultations
Consultations have taken place with the Interim Chief Executive, Depute
Chief Executive (Economy, Environment and Finance) and Depute Chief
Executive (Education, Communities and Organisational Development)
and the Strategic Leadership Forum. 
6. CONCLUSION 
6.1 Review of the Council’s Second Tier Governance Documents was
recognised as the logical follow on from the completed a review of the
Council’s primary committee governance documents 
6.2 A programme of review of these documents was previously approved. 
6.3 The Committee are asked to note progress with the review and to
approve Guidance on councillor/officer relations and Guidance for
councillors on outside bodies. 
Author of Report:  Alasdair McEachan, Head of Governance, Strategy and
Performance. 
Background Papers:  None 
Ref:    SPMAN-2045703626-429
SPMAN-2045703626-427  
SPMAN-2045703626-430
Page 146

Page 147

1
Appendix 1
Moray Council 
Guidance on Councillor/Officer relations 
Purpose 
Collaborative leadership has been identified as a strategic issue in both the Council’s
Corporate Risk Register its Best Value Action Plan.   
This guidance is designed to assist in the working relations between councillors and
officers and to give advice on what to do when problems occur. 
Index 
1. General Principles
2. Who this Guidance applies to
3. The Role of Councillors
4. The Role of Officers
5. Conduct and Relationships
6. Access to Advice
7. The Council as Employer
8. Monitoring Performance
9. Support for Officers
10. Support services to Councillors and Party Groups
11. Access to Information and Documents
12. Multi-Member Wards
13. Meetings and Correspondence
14. Media Relations
15. Review of the Guidelines 
Document author Head of Governance Strategy and Performance
Approved by Corporate Committee
Date of approval  
Suggested review 5 yearly 
Item 15.
Page 147

Page 148

2 
1 GENERAL PRINCIPLES 
1.1 This Guidance sets out the separate but complementary roles and
responsibilities of councillors and officers and how they should interact with
each other in running the daily business of the Council efficiently for the
benefit of Moray. 
1.2 The Guidance cannot cover every eventuality but sets a framework for dealing
with issues as they arise. 
1.3 The general principles which underpin this Guidance are that councillors and
officers should: 
• Work together effectively
• Act within the law and the Standing Orders of the Council
• Treat each other with mutual courtesy
• Communicate effectively with one another
• Adopt a constructive approach to resolving differences and difficulties 
1.4 This Guidance complements wider legislation and Council policies: 
• Councillors’ Code of Conduct (Standards Commission for Scotland –
December 2021) promoted under the Ethical Standards in Public Life
(Scotland) Act 2000
• Annex A of the Councillors’ Code of Conduct: Protocol for relations
between Councillors and Employees 
• Moray Council Code of Conduct for Employees
• Moray Council Constitutional Documents, including its Standing Orders
and Scheme of Administration.
• Moray Council Second Tier Governance Documents. 
2 WHO THIS GUIDANCE APPLIES TO 
2.1 The main focus of this guidance is on contacts between councillors and senior
officers at Chief Executive, Depute Chief Executive, Head of Service and
Senior Management level. 
2.2 There are also many contacts between councillors and other officers in their
daily business, and the general principles of the guidance also apply to them. 
2.3 The guidance also deals with relations between councillors. 
3 THE ROLE OF COUNCILLORS 
3.1 Councillors have a number of different roles within the Council: 
▪ Some are Chairs or are in Senior Councillor positions
▪ Many belong to political groups, with others forming independent groups
Page 148

Page 149

3
▪ Each has a local ward to represent along with other Elected Councillors,
involving contact with local groups and providing surgeries for individual
constituents
▪ Each may represent the Council in partnership arrangements and on
outside organisations. 
3.2 Collectively, councillors also: 
▪ Provide strategic leadership;
▪ Agree the Council budget
▪ Determine policy aims and objectives;
▪ Take decisions not delegated to officers and;
▪ Review performance 
In all such roles, Councillors should act in accordance with the principles of
the Code of Conduct for Councillors and this guidance. 
The Council and Committees
3.3 The main functions of the Council are to: 
▪ Debate and agree policy proposals;
▪ Debate and agree budgets;
▪ Appoint the Councillors of regulatory and other committees;
▪ Make appointments to outside bodies and;
▪ Provide a forum for debating key issues 
Details of remits for the Council and committees are included in the Council’s
Standing Orders and Scheme of Administration. 
3.4 Councillors may be faced with situations where a council or committee
decision is taken which goes against a particular personal, budgetary or ward
position which that councillor has pushed for. 
The Code of Conduct states: 
I have a duty to act in the interests of my council as a whole and all the
communities served by it and a duty to be accessible to all the people of
the area for which I have been elected to serve, and to represent their
interests conscientiously. 
Councillors should respect council or committee decisions even where they
voted against them and may not agree with them. 
3.5 It should be noted that under the Local Government (Scotland) Act 1973,
functions or decisions cannot be delegated to individual Councillors.  Thus an
individual Councillor can never have power to make decisions which bind the
Council. 
Page 149

Page 150

4
3.6 Where a decision or power has been delegated to an officer this can include a
requirement for certain councillors to be consulted by that officer in exercising
their delegation. 
3.7 Councillors are not individually empowered to instruct officers and must not
get involved in the operational management of Council services; this is an
officer role. 
4 THE ROLE OF OFFICERS 
4.1 Chief Executive: 
▪ The Chief Executive is the statutory Head of Paid Service and is
responsible for managing and securing a professional body of staff to
deliver modern, well-focussed service effectively. 
▪ The Chief Executive, as the most senior manager, is the ultimate point of
escalation for Councillors when difficulties arise; however Councillors
should generally raise any problem (which has not been resolved through
normal channels outlined in paragraph 6.1 below)  with the appropriate
Depute Chief Executive or Head of Service in the first instance.
▪ The Chief Executive, as the Head of Paid Service, will work closely with
the Leader of the Council in ensuring policy implementation, managing
risk and reputational issues, but will work impartially with all groups and
individual Councillors. 
4.2 Senior Officers 
▪ The Chief Executive and Depute Chief Executives are responsible for
o assisting the Council in the development of its policies and the
discharge of its responsibilities
o ensuring policy implementation
o ultimate oversight of operational management of services 
▪ Depute Chief Executives and Heads of Service have managerial
accountability for their service areas and act as the point of contact for
escalation of issues that arise within that service; 
▪ Some officers have personal statutory powers and duties including:
o  Head of Paid Service (Chief Executive)
o Section 95 Officer (Head of Financial Services) 
o Monitoring Officer (Head of Governance, Strategy and Performance) 
o Chief Social Work Officer (Head of Service MIJB)
o Chief Planning Officer (Head of Economic Growth and Development) 
4.3 Officers more generally 
Some officers have professional skills relevant to a particular organisational
task.  Others have primarily a managerial responsibility.  Many have elements
of both in their jobs. 
Page 150

Page 151

5
4.4 Officers should: 
▪ Maintain political neutrality at all times
▪ Act within the law and in the interests of the Council.
▪ Comply with the Council’s Employee Code of Conduct.
▪ Comply with agreed policies and standards of the Council;
▪ Implement the decisions of Council, committees and sub-committees;
▪ Inform Councillors timeously of any decision that cannot be fully
implemented, (senior officers should undertake this task);
▪ Behave in a professional manner;
▪ Treat all Councillors fairly and openly in their role as local representatives;
▪ Deal with Member enquiries promptly and efficiently; 
4.6 Officers should implement the decisions of the Council and its committees
even if they have professional misgivings about proposed decisions.  Advice
should be given in terms of paragraph 6.2 below. An officer will normally have
a duty not to implement a Council decision if it is manifestly illegal.  In such
circumstances, the officer should seek the advice of the Monitoring Officer
and the Chief Executive. 
4.7 Officers’ delegated powers are outlined in the Council’s Scheme of Delegation
which forms part of the Council’s Constitutional Documents. In particular,
where there is a significant and direct impact on a particular council ward,
officers would normally consult all councillors within that Ward before
exercising their delegation. Officers will seek to resolve any difference of
views of ward councillors informally. If this is not possible officers, in
exercising their delegation will consider whether escalation to CMT or a
council/committee meeting is appropriate in terms of paragraph 1 (6) (f) of the
Scheme of Delegation. 
5. CONDUCT AND RELATIONSHIPS 
5.1 Courtesy – in line with the Councillors’ Code of Conduct reference to “mutual
trust and respect” – it is important that councillors and officers should behave
courteously to one another.  Neither should take unfair advantage of their
position. 
5.2 Disagreements – should be acknowledged and worked out in private rather
than in public view. 
5.3 Close personal friendships – personal friendships between individual
Councillors and officers can also damage good relations and prove
embarrassing to other Councillors and officers.  Councillors and employees
should, therefore, be cautious in developing close personal friendships while
they have an official relationship. 
5.4 Constructive criticism – Councillors have the right to make reasonable and
constructive criticism of the work of officers.  Councillors should remember
that officers cannot respond to personal criticisms of themselves or other
Page 151

Page 152

6
officers in the same way that politicians can and should make their comments
accordingly.  In accordance with the Code of Conduct for Councillors,
Councillors should not raise matters relating to the conduct or capability of
employees in public.  Employees must accord to Councillors the respect and
courtesy due to them in their various roles. 
5.5 Lines of accountability – Councillors must be aware of the lines of
accountability within services.  They should be mindful of their status and
must not apply pressure to an officer to act against the instructions of
management. 
5.6 Decisions delegated to officers – Councillors should not put pressure on an
officer on matters which have been delegated for officer decision.  Officers
should be left to make decisions that are: 
▪ Objective and can be accounted for
▪ Fair and consistent in their applications 
5.7 Undue influence – Councillors should not bring undue influence to bear on
an officer to take any action which is contrary to law or against the Council’s
approved procedures.  This could include action which is: 
▪ A breach of personnel procedures
▪ In conflict with Standing Orders/financial regulations
▪ In conflict with planning procedures and policies
▪ In conflict with Codes of Conduct 
5.8 Declaring relationships with constituents – Councillors must declare any
relevant close personal relationships with constituents when dealing with
council officers.  Although Councillors are elected to represent the interests of
their constituents, they should not seek special treatment for any individual. 
6.  ACCESS TO ADVICE 
6.1 Officers provide professional and managerial advice to Councillors in a
number of settings. 
▪ To the Council, committees, sub-committees and working groups in written
reports
▪ To the political leadership
▪ To the party groups
▪ To individual Councillors with political roles (committee Chairs, Portfolio
Holders)
▪ To individual councillors as ward councillors 
6.2 Council officers should provide clear and consistent advice to the Council, its
committees and councillors/groups of councillors where appropriate. This
normally includes considering options and setting out the relative risks and
consequences of these options. Officers within a service are accountable to
Page 152

Page 153

7
their Depute Chief Executive and Heads of Service and should take this into
account when giving advice to councillors. 
6.3 In the spirit of informed and co-operative working the Chair of a committee will
often be consulted on the preparation of committee agendas and reports. 
However the ultimate decision on whether to submit a report to Council or
committee and the content of the report is one for officers.  While employees
will wish to listen to the views of Chairs or Portfolio Holders, the report
signatory will always have final responsibility for the contents of any report
submitted in their name.   
6.4 The decision on whether to submit a Notice of  Motion to Council is one for an
Elected Member, subject to the provision in Standing Orders which allows the
Chair to rule on the competency of a Notice of Motion and Council guidance
on Notices of Motion. An Elected Member has the right to submit a motion to
the Council or committee which disagrees with the advice and
recommendation of an officer.   
Committee Chairs
6.4 Committee Chairs are recognised as the legitimate spokespersons on their
committee’s  area of responsibility.  Where authority is delegated to
employees they may wish to consult the relevant Chair about the action they
propose to take but the responsibility for the final decision remains with the
employee who is accountable to the wider Council for it. CommitteeChairs
should bear this in mind when discussing proposed action with employees. 
6.5 Committee Chairs  will have many dealings with employees.  These
employees should always seek to assist a Chair but it must be remembered
that they are ultimately responsible to theirline managers.. 
Party or Independent Groups and Officers
6.6 The Council operates through a system of groups of councillors, based on
political affiliation and independent councillors.  All employees must, in their
dealings with Groups and councillors, treat them in a fair and evenhanded
manner.  Employees must at all times maintain political neutrality and advice
given to different groups should be consistent. .   
6.7 Officers may properly be called upon to support and contribute to
deliberations by groups on matters of Council business under consideration. 
This support can be provided in many forms, ranging from a briefing meeting
with a Committee Chair, briefing to cross party groups or a presentation to a
full party group meeting.  Whilst in practice such support is likely to be in most
demand from the group or groups in control of the Council, support is
available to all Groups and non aligned councillors on a reasonable and 
proportionate basis, taking account of any specific governance arrangements
agreed such as the Strategic Leadership Forum or  Budget  Protocol.   
6.8 For officers below Head of Service level, if officer attendance at a group
meeting is required, the office bearers of the Group should contact the Chief
Executive and outline the type of advice they are seeking.  The Chief
Page 153

Page 154

8
Executive will decide whether attendance at the meeting is appropriate, and
which officer(s) should attend. 
6.9 Officer support in these circumstances must not extend beyond providing
information and advice in relation to matters of Council business.  Officers
must not be involved in advising on matters of party or political business and
are not expected to be present at meetings or parts of meetings when matters
of party business are to be discussed.   
6.10 Officers must respect the confidentiality of any group discussions at which
they are present. They should not disclose the nature of these discussions or
advice given to other groups/councillors without consent.. It is acknowledged
however that factual information upon which any advice is based will, if
specifically requested, be shared with another group or councillor. If officers
receive information which, although confidential, they have a duty to disclose
elsewhere, they must indicate that this is the case.   
6.11 Officers should not be asked to give advice at a group meetings where non-
councillors are present. Officers role is to provide advice to the Council and 
as non-councillors are not bound by the Code of Conduct. 
6.12 Conclusions reached at party group meeting are not Council decisions, and it
is essential that they are not interpreted or acted upon as such. 
6.13 Providing information and advice to a group cannot act as a substitute for
providing all necessary information and advice to Council or the relevant
committee or sub-committee. 
6.14 Councillors should recognise that information and advice given by employees
should be used to enhance discussion and debate at Council and committee
meetings.  Such information shall not be used for political advantage, for
example media briefings beforehand, then the process could become
devalued and place employees in a difficult position in giving information and
advice. 
6.15 The Chair of a political group meeting attended by employees has a
responsibility for ensuring that those attending are clear on the status of the
meeting and the basis on which employees are attending. 
6.16 Officers must never allow their own personal or political opinions to interfere
with their professional advice.  Officers should not take part and councillors
should not ask officers to take part in any activity which could be seen as
influencing support for a party.  Councillors should raise with the Chief
Executive any concerns about the political neutrality of an officer. 
6.17 Senior Officers, and other officers providing advice and support services to
Elected Councillors, are subject to legal rules limiting their political activities
outside work. 
Page 154

Page 155

9
6.18 Should any difficulty or uncertainty arise in the area of employees’ advice to
party groups, this should be raised with the Chief Executive, who will discuss
the matter with the group leader. 
7.  THE COUNCIL AS EMPLOYER 
7.1 Officers are employed by the Council and both they and the Council are
governed by contracts of employment and the Council’s personnel policies
and procedures.  The Council has a duty of care towards all of its employees
and these Guidelines reflect this. 
7.2 In making employment decisions, the key principles for Councillors to follow
are: 
▪ Councillors involved in appointments of employees must act fairly and
openly and judge candidates solely on merit
▪ Councillors should not gain financially or personally, nor should their
families or friends
▪ Councillors have a duty to declare any private interest, and to protect the
public interest
▪ Councillors should have no involvement in employment or recruitment
decisions in which they have a personal interest
▪ In making public appointments or recommending people for rewards or
benefits, Councillors must make choices on merit, using objective criteria
▪ Councillors should be open about, and are accountable for, the decisions
they make in the role of employer.  However, some employment matters
should be dealt with in confidence.
▪ Employment issues are usually dealt with by following written procedures,
often agreed with the unions.  Councillors should not do anything to
undermine the following of proper procedures. 
7.3 Councillors are collectively responsible when acting as employer and are
bound by the complete framework of national employment law.  However, it
must be noted that an individual who commits an act of discrimination on the
basis of race, gender or disability can be personally liable.  The Council is an
equal opportunity employer and Councillors should be guided by this principle
in all their relationships with staff. 
7.4 In addition, under the Code of Conduct: 
▪ Councillors must not solicit a job with the Council for any person (but, in
appropriate cases, may give them a written testimonial)
▪ Councillors must not try to influence the recruitment process
▪ Councillors should know that canvassing support for a candidate for a job
with the Council disqualifies the candidate from that job 
7.5 Councillors must not become involved in issues relating to individual
employees’ pay or terms and conditions of employment, except while serving
on a committee delegated to deal with such matters.  Panels of Councillors
are normally established for Chief Executive and Chief Officer appointments,
Page 155

Page 156

10
and for certain disciplinary and grievance processes relating to the Chief
Executive and Chief Officers.  There are Appeals Committees which hear
appeals lodged by members of staff against certain decisions. All other
disciplinary, capability or grievance processes are decisions for officers.   
7.6 Councillors are not individually empowered to instruct officers and must not
get involved in the operational management of Council services; this is an
officer role. Nor must Councillors become involved in the management of
Council employees or engage in activities which might undermine the
management lines of responsibility or adherence to Council personnel
procedures,.   
7.7 Councillors will regularly come into contact with Trade Union representatives
in the Joint Consultative Committee (JCC).  The remit of the committee is: 
▪ To provide a forum and procedure for councillors and Trade Union
representatives to meet on a regular and constructive basis to exchange
information and resolve issues of mutual concern and
▪ To promote and develop good relations between the Council and their
recognised Trade Unions 
7.8 This forum does not have a remit to become involved in matters affecting an
individual employee’s terms, conditions and pay and Councillors must
observe this remit in their contacts with Trade Union Officials. 
7.9 Councillors must, at all times, adopt a professional approach in their dealings
with the Trade Unions and in particular must: 
▪ Avoid giving unauthorised commitments
▪ Take a balanced view of information provided by the Trades Unions along
with that of officers
▪ Not allow undue influence to be placed upon themselves 
7.10 Likewise, officers must not raise directly with councillors any personal matter
to do with their jobs, or relating to any potential appointment. 
7.11 There are restrictions on former Elected Councillors’ employment within the
Council.  A 12 month restriction for former Councillors being employed in
politically restricted posts and for former Councillors who have been directly
involved in the appointments process for Council Officers holding politically
restricted posts, but the restriction is 3 months for all other posts. 
8 MONITORING PERFORMANCE 
8.1 Councillors should set the parameters for Council work and then let officers
undertake the work, whilst ensuring that strong monitoring and performance
management systems are in place.  Councillors should not be involved in the
operational management of Council services; this is an officer role. 
Page 156

Page 157

11
8.2 Councillors have a right to scrutinise reports or the actions taken by officers,
but they should always: 
▪ Avoid personal attacks on officers
▪ Ensure that criticism is constructive and well founded
▪ Avoid undermining respect for officers at committee meetings, in any
public forum or through the media
▪ Use the agreed resolution procedures (when resolution cannot be
achieved through normal lines of communication) 
8.3 The Chief Executive, as the statutory appointed Head of Paid Service, is the
first point of contact for councillors regarding organisational and staffing
matters. Depute Chief Executives and Heads of Service are the first point of
contact in their respective service areas. 
8.4 Complaints about officers or Council services should be made to the Depute
Chief Executive or to the Chief Executive as appropriate.  Councillors have a
duty to raise any issues that they have reason to think might involve fraud or
corruption of any sort.  These issues must, however, be raised through the
proper channels. 
8.5 The Monitoring Officer is specifically responsible for reporting any proposal,
decision or omission by the Council or its officers which causes or is likely to
cause:
▪ A contravention of the law or any code of practice
▪ A maladministration or injustice which could be investigated by the
Scottish Public Services Ombudsman 
9. SUPPORT FOR OFFICERS 
9.1 Just as Section 9 of this protocol provides Councillors with a mechanism for
scrutinising the actions or decisions of officers, officers too must have some
protection where they feel that Councillors’ expectations are unreasonably
demanding or in conflict with managerial instruction or Council policy or
procedure.   
9.2   Complaints or concerns should be raised with the appropriate Depute Chief
Executive, or with the Chief Executive.  Officers have the right to make a
complaint about a breach of the Councillors’ Code of Conduct to the
Standards Commission.  While individual Councillors have the right to defend
any such complaint, pressure must not be put on any officer by Council, its
committees or councillors to withdraw or amend the complaint. 
10 SUPPORT SERVICES TO COUNCILLORS AND PARTY GROUPS 
10.1 The Council can only lawfully provide support services to Councillors to assist
them in discharging their role as Councillors of the Council – including
secretarial and typing support, policy support, stationery, printing,
photocopying, transport. 
Page 157

Page 158

12
10.2 Support services must be used only for Council business.  They must never
be used in connection with party political or campaigning activity or for private
purposes.  Councillors should never ask staff to provide improper support. 
▪ They cannot represent or stand in for Councillors
▪ The existence of Councillors’ services support staff should not detract from
normal Member/officer relationships 
11 COUNCILLORS’ ACCESS TO INFORMATION AND DOCUMENTS 
11.1 Councillors will require information, explanation and advice about Council
services to enable them to carry out their roles as Councillors.   
• For routine constituency work (seeking information on behalf of a
constituent) and straightforward information responses councillors are
free to approach the appropriate service service officer. 
For example a constituent may approach a councillor in their ward
about the progress of a planning application. The councillor could
approach the planning case officer for an update. 
• For more complex, controversial or time-consuming enquiries
councillors are invited to approach the relevant Head of Service or
Depute Chief Executive 
For example, a constituent may approach a ward councillor about the
discriminatory effect of a council burials policy. It would be more
appropriate for the councillor to approach the Head of Service in this
instance. 
11.2 Councillors have certain statutory and common law rights to request and
inspect Council documents.  The common law rights are wider and more
significant than those given by the Access to Information provisions of the
Local Government (Scotland) Act 1973.  For instance, papers which contain
“exempt information” relating to the categories specified in the Access to
Information legislation may fall within the rights of inspection given to
councillors by common law. 
11.3 Councillors have a statutory right to inspect any Council document which
contains material relating to any business which is to be transacted at a
Council, Committee or sub-committee meeting.  This extends not only to
reports which are to be submitted to the meeting but also to any relevant
background papers.  In relation to reports which are exempt under the Local
Government (Scotland) Act 1973, Council practice has generally been to
disclose these where possible, on request. It should however be appreciated
that there are certain documents which cannot be disclosed particularly those
which contain sensitive personal information relating to employees, occupiers
of Council property, applicants for grants and other services, the care of
children, social work and criminal justice cases. In other cases, such as an
opinion of Counsel or documents relating to contract negotiations, disclosure
may only be made if the councillor signs an undertaking promising not to
further disclose the document.
Page 158

Page 159

13 
11.4 The common law right is based on the principle that any Member has a right
to inspect Council documents if access is reasonably necessary to enable the
Member to perform his/her duties as a Member of the Council – commonly
referred to as the “need to know” principle. 
11.5 The exercise of this common law right depends upon the Member’s ability to
demonstrate that he/she has the necessary “need to know”. This question will
initially be determined by the Depute Chief Executive who holds the document
in question.  In the event of a dispute, the question should be referred to the
Chief Executive (taking advice if necessary from the Monitoring Officer). 
11.6 A “need to know”, and therefore a right to inspect, will not exist in relation to: 
▪ A document which forms part of the internal workings of another party
group
▪ The working draft of an officer’s report before it has been authorised for
circulation to Council or other committee
▪ Personal information covered by the provisions of the Data Protection Act 
11.7 In some areas there are specific statutory codes which deal with the treatment
of confidential information.  This is especially true of Education and Social
Work records.  At all times, both Councillors and officers must recognise the
need to operate within the overall legislative framework surrounding
information.  There is no automatic right to confidentiality of any
communication. Councillors and officers need to be aware that the Council is
subject to the rigours of the Freedom of Information (Scotland) Act and
Environmental Information (Scotland) Regulations and Re-use of Public
Sector Information Regulations which require the Council to provide, subject
to exceptions, recorded information held by it. 
11.8      Councillors and officers should be aware of the provisions of the Data
Protection Act 1998.  If Councillors hold personal information (such as details
of constituent enquiries), and most will do so, they will require to be registered
under the Data Protection Act. When holding such personal information
Councillors must abide by the following rules:-
o Councillors must only use the information for the purposes for which it
was given.
o Councillors must not share this information with anyone without the
consent of the person giving the information. If a constituent or other
member of the public asks you to resolve an issue you are allowed to
contact officers to attempt to resolve the issue on behalf of your
constituent.
o You should not keep the information any longer than you need to. 
Councillors requesting sensitive personal information on behalf of constituents
from the Health and Social Care Partnership or other Directorates will only
receive such information if they have a signed consent form from the
constituent asking the Councillor to obtain such information.
Page 159

Page 160

14 
11.9 Councillors should not put pressure on officers to provide them with
documents to which they have no statutory or common law right or to withhold
from other Councillors documents to which they have a statutory common law
right of access.  The advice of the Monitoring Officer and the Chief Executive
should be sought promptly if there is doubt about whether access should be
given. 
11.10 If a Member is refused information by a Council employee they should be
clearly advised as to why they are being refused.  If a Member is not satisfied
by the refusal he should initially raise the issue with the appropriate Depute
Chief Executive.  If a Member is not satisfied with the Depute Chief
Executive’s refusal of information the member can appeal this refusal to the
Council’s Chief Executive who may refer this to the Monitoring Officer to be
dealt with as a Freedom of Information Review.  If the Chief
Executive/Monitoring Officer refuses the request on the basis that it results in
the disclosure of personal information under the Data Protection Act, or on the
basis that disclosure would be illegal, the Member can appeal this refusal to
the Freedom of Information Commissioner.   
11.11 Both Councillors and officers have access to information which has not yet
been made public and is still confidential.  It is a betrayal of trust to breach
such confidences.  Confidential information must never be disclosed or used
for personal advantage or to the disadvantage or the discredit of the Council
or anyone else.  This is a breach of the Councillors’ Code of Conduct. 
11.12 Like any member of the public, councillors have a right to get copies of
documents under the Freedom of Information (Scotland) Act 2002 and the
Data Protection Act 2018.  In light of the procedures outlined above,
Councillors will not normally be expected to formally request information
under these Acts 
12 MULTI-MEMBER WARDS 
12.1 Councillors have a duty to be accessible to all the people of the multi-member
ward they have been elected to and to serve their interests conscientiously. 
However Councillors also have a duty to act in the interests of the Council
area as a whole and all the communities served by it, not just those of their
own ward or town. 
12.2 Multi-Member wards have implication for the co-ordination of constituents’
enquiries.  Individual constituents have the right to choose to approach any of
the councillors representing their ward. 
12.3 When constituents seek contact with local councillors, information should be
provided in a consistent manner, leaving the constituent to choose which
councillor they wish to contact. Councillors’ names and contact details should
be provided in alphabetical order, by surname, along with their political
affiliation.  
Page 160

Page 161

15 
12.4 Where a constituent has not identified a particular councillor to deal with their
concerns, officers should contact the constituent to clarify which councillor
they would like to deal with their enquiry. 
12.5 If a constituent does not wish to specify a councillor, the last resort should be
to copy the query to all the ward councillors, with the express permission of
the constituent. 
12.6 Councillors within a particular ward may agree among themselves on ways of
allocating responsibilities, however the individual constituent has the right to
approach the ward councillor of their choice. 
12.7 The relationship between the ward councillor and constituent is of a
confidential nature, therefore the consent of the constituent is required before
any information about them or the nature of their query is passed between
ward councillors. 
12.8 A ward councillor may suggest to a constituent passing on their query to
another ward councillor.  Such a referral should only be made with the
express approval of the constituent who may request that the enquiry be dealt
with by the ward councillor of their choice.   
12.9 There is the possibility that constituents could raise their concerns with more
than one ward councillor, without the other ward councillors knowing this. 
This could lead to the situation where one officer is dealing with an enquiry
without knowing that another officer is also dealing with the same enquiry.  To
avoid this potential duplication, ward councillors are encouraged to clarify the
position with constituent enquirers. 
12.10 Officers in receipt of a constituency enquiry from a ward councillor will not
divulge the nature and existence of that enquiry to other ward councillors 
without the consent of the original ward councillor. 
12.11 Occasionally a constituent may pass an enquiry to a councillor who is not their
ward councillor. In this situation the councillor who has received the enquiry
will seek the consent of the relevant ward councillors before taking on enquiry.
Consent from the constituent will be needed to make this approach. 
13  MEETINGS AND CORRESPONDENCE 
13.1 Both councillors and officers should take proper account of the time demands
each is under when arranging meetings, particularly at short notice. 
13.2 Officers should respond to requests for meetings with councillors with priority
but where these are requested at short notice, councillors should accept that
officers may have pre-arranged commitments. 
13.3 There is no requirement for officers to invite other ward councillors to, or notify
them about, meetings organised by an individual councillor with that officer.
Page 161

Page 162

16 
13.4 When councillors initiate a meeting, officers should always ensure that the
councillors are given the opportunity to have other ward councillors attend. 
13.5 Whenever a public meeting or consultative exercise on an issue local to one
or more wards, is arranged by the Council, all ward councillors should
generally be invited to attend that meeting. 
13.6 Officers should not divulge their discussions with individual councillors to
other councillors, particularly councillors of another political party, without the
consent of the individual councillor concerned. Correspondence between an
individual Councillor and an officer should not be copied by an officer to any
other councillor.  Where it is necessary to copy the correspondence to another
councillor, this should be made clear to the original councillor at the time, or
the consent of the original councillor obtained. Officers are however entitled to
divulge such discussions and correspondence to other officers, particularly
Chief Officers where required. These other officers will also be bound not to
disclose the discussions or correspondence to other councillors, without the
consent of the original councillor. 
13.7 When officers write to or meet with residents regarding matters of general
concern in an area, all ward councillors should be sent copies or informed. 
14. MEDIA RELATIONS 
14.1 Councillors and officers are often required to represent the Council’s position
in the press and media on areas of public and media interest. In terms of the
Council’s communications and media protocol all such communication is
handled by the Council’s corporate communications team who act on behalf
of CMT. 
14.2 The Chief Executive, in consultation with the Council Leader where
appropriate, will authorise press releases and similar information on behalf of
the Council and deal with media enquiries through the corporate
communications office. 
14.3 A similar process will apply to committee business where the Chief
Executive/Depute Chief Executives or Head of Service shall consult the
relevant committee chair. 
14.4 The Council’s Leader, Depute Leader, Civic Leaders and committee chairs
may also make media comment on behalf of the Council. The terms of any
such press/media release will be agreed in advance with the appropriate
senior officer and the Council’s corporate communications office. 
14.5 Press releases are distributed to all councillors at the point of release to the
general media. 
14.6  Councillors are reminded of the confidentiality provisions in the Section 3.21
of the Code of Conduct: 
Page 162

Page 163

17 
I will not disclose confidential information or information which should
reasonably be regarded as being of a confidential or private nature,
without the express consent of a person or body authorised to give
such consent, or unless required to do so by law. 
14.7 Particular care should be taken with the information in confidential papers
which go to committee. Standing Order 73 (a) gives authority to the Council
Leader (Chair) for this to be released: 
Information as to the proceeding at any meeting from which the public
and press are excluded shall not be given to representatives of the
press or to any other person except by the Leader, or a person
authorised by the Leader to do so. 
14.8 If in doubt councillors should seek advice from an appropriate senior officer.  
15 REVIEW OF THIS GUIDANCE 
15.1 This guidance will be kept under review and may be amended by the Council
from time to time.  Any amendments will be communicated to employees and
councillors. 
Page 163

Page 164

Page 164

Page 165

APPENDIX 2 
GUIDANCE FOR COUNCILLORS 
SERVING ON OUTSIDE BODIES 
INDEX 
1.  Aim of Guidance 
2.  Conflicts of Interest 
2.1  General 
2.2  Registration of Interest 
2.3  Declaration of Interest 
2.4  Discussing and voting 
2.5  Irreconcilable Conflict 
3.  Duties and Liabilities owed to outside bodies 
3.1  Code of conduct 
3.2  Constitution of outside bodies 
3.3  Trusts 
3.4  Limited Company 
3.5  Unincorporated Association 
4.  Decision making on outside bodies 
5. Insurance issues with outside bodies. 
Document author Head of Governance, Strategy and Performance
Approved by Moray Council
Date of approval  
Suggested review 5 yearly 
Item 15.
Page 165

Page 166

APPENDIX 2 
Page 166

Page 167

APPENDIX 2 
1.  AIM OF GUIDANCE 
1.1  Councillors may become involved in different types of outside bodies such as
sports clubs, housing associations, community organisations, trusts, volunteer
groups, limited companies etc. The aim of this guidance is to set out the
duties owed by Councillors to these outside bodies and to assist Councillors in
balancing the separate and sometimes competing interests that they may
encounter whilst serving on outside bodies. Help is always available from the
Legal Services Section or Monitoring Officer where Councillors have any
questions about their position. 
2.  CONFLICTS OF INTEREST 
General 
2.1 In some cases the Council appoints a Councillor to serve as its representative
on the outside body. In other cases, the Councillor may have been appointed
independently of any Council involvement. The duties which Councillors owe
to outside bodies are detailed in Part 3 below. Sometimes these duties will
conflict with their duties to the Council. In general the Councillor's primary
duty is owed to the outside body. 
Registration of interest 
2.2 A Councillor's involvement in an outside body will mean that the Councillor
should register their involvement under Part 4 of the Code of Conduct
introduced by the Ethical Standards in Public Life etc (Scotland) Act 2000 (the
Code) which states: 
Category Eight : Non-Financial Interests 
4.22 I may also have other interests and I understand it is equally important
that relevant interests such as membership or holding office in public bodies,
companies, clubs, societies and organisations such as trades unions and
voluntary organisations, are registered and described. In this context, I
understand non-financial interests are those which members of the public with
knowledge of the relevant facts might reasonably think could influence my
actions, speeches, votes or decision-making in my council (this includes its
Committees and memberships of other organisations to which I have been
appointed or nominated by my council). 
Guidance on the Code of Conduct contains further information at paragraph
128.   
2.3 It is each Councillor’s personal responsibility to ensure that his/her
Register of Interests is updated timeously i.e. within one month of a
change of circumstances. 
Page 167

Page 168

APPENDIX 2 
Declaration of interest 
2.4 When an issue regarding the outside body is considered by the Council or a
committee, or where the affairs or an issue regarding the Council is
considered by the outside body then a Councillor should consider whether you
need to declare an interest. 
2.5 There are 3 steps in section 5 of the Code for determining whether you need
to make a declaration of interest:
• Connection – do you have a connection to the item under discussion?
• Interest –is the objective test met?
• Participation- Can you remain in the meeting? 
2.6 Council appointment: If you are appointed to the outside body as a Council
Representative: 
Such outside bodies can include statutory bodies (such as regional
transport partnerships and health and social care integration joint
boards), joint committees (such as city region deals and Scotland
Excel), ALEOs and voluntary organisations. 
2.7 This appointment should be on your Register of Interests but would not
normally be a connection (Code para 5.4 c) unless: 
• it is a planning/regulatory issue 
• you have a particular personal conflict
• The Council’s interests and the interests of the outside body are not
clearly aligned; there is a particular tension or point of difference. 
2.8 Non-Council appointment: If your membership of an outside body is not a
council appointment this should be on your Register of Interests and as such
would be a connection in terms of the Code section 5.3. 
Where you have a connection you then need to consider the objective test: 
Where a member of the public, with knowledge of the relevant facts,
would reasonably regard your connection as so significant that it would
be considered as being likely to influence the discussion or decision
making.         
If the test applies you must 
• declare what your connection is at the appropriate point of the meeting
• leave the meeting while the agenda item is under debate. 
2.9 If you are in doubt as to whether to declare it is generally speaking better to
err on the side of caution and make the declaration. Advice can always be
sought from the appropriate Council officials (Legal Services/Monitoring
Officer)  in advance of the meeting where possible. 
Page 168

Page 169

APPENDIX 2 
2.10 Transparency statements: Where the objective test is not met, then you can
consider making a transparency statement. This could be as follows: 
In relation to item x on the agenda I would like to state for transparency
that whilst I do have a connection (provide details of connection) I do
not feel, in terms of the objective test, that this is significant enough to
formally declare an interest. 
2.11 You could also consider a transparency statement if you are appointed to an
outside body by the Council 
In relation to item x on the agenda I would like to state for transparency
that I am a council nominated (director/ board member/trustee etc) on x
Organsiation.. I am not required to declare and will participate in
discussion. 
2.12 Provided Members are sensitive to the possibility of conflicts of interest, there
is no reason why they should not express a "Council" view when acting on an
outside body. They should, however, make it clear that they do not represent
the Council on the outside body, and so cannot bind the Council by what they
say. In many cases Councillors will be able to act as valuable links between
outside bodies and the Council. 
2.13 Irreconcilable Conflict: As a general rule, if a Councillor is involved in an
outside body in an executive capacity (i.e. as a Director, Trustee or member
of the body's Management Committee) their primary duty will be to the outside
body. 
2.14 If there is a major dispute or point of difference between the Council and the
outside body then the Councillor may be placed in an untenable situation.
The councillor may find that they are unable adequately to carry out their
responsibilities properly both as an elected Member of the Council and as a
member or director of the outside body. Councillors are encouraged to seek
advice in this situation. 
2.15 This situation however is very rare and should not discourage Councillors
from being prepared to participate in the management and running of outside
organisations. Membership of outside bodies assists with open and
accountable government. 
3.  DUTIES AND LIABILITIES OWED TO OUTSIDE BODIES 
3.1  Clause of the Code of Conduct states: 
3.30 If I am appointed or nominated by the Council as a member of another
body or organisation, I will abide by the rules of conduct and will act in the
best interests of that body or organisation while acting as a member of it. I will
also continue to observe the rules of this Code when carrying out the duties of
that body or organisation. 
Page 169

Page 170

APPENDIX 2 
3.31 I accept that if I am a director or trustee (or equivalent) of a company or a
charity, as a nominee of my Council, I will be responsible for identifying, and
taking advice on, any conflicts of interest that may arise between the company
or charity and my council. 
3.2 Constitution of outside bodies: 
The following table shows the type of outside bodies a councillor is likely to be
involved in and summarises how each type of outside body is set up and
managed: 
Type of Body Governing
Document
Management Type of
Councillor
Involvement
Usual Types
of
Organisation
Trust/Charitable
Trust
Trust Deed Management
by a Board of
Trustees
Trustee Educational
Trusts, Golf
Courses,
restricted
purpose land
holdings
Company
Limited by
Guarantee
Memorandum
and Articles
of
Association
Board of
Directors and
Members
Meetings
Usually as
Director but
sometimes
as ordinary
member
Charitable
Organisations
(eg Moray
Leisure Centre,
Housing
Associations,
Community
Associations)
Company
Limited by
Shares
Memorandum
and Articles
of
Association
Board of
Directors and
Members
Meetings
Usually as
Director but
sometimes
as ordinary
member/
Shareholder
Commercial
organisations
(eg Moray
Microbiological
Laboratory)
Statutory or
Joint Board
Constitution Committee
meetings
As a
member
eg Joint
Valuation
Board
Unincorporated
Association
Constitution Meeting of
Members/
Management
Committee
Ordinary
Member or
Member of
Management
Committee
Community
Associations,
Village Halls 
The Duties and Liabilities of a Councillor sitting on each of these bodies are
detailed below with a brief description of the legal structure of each body. 
Trusts 
3.3 A Trust consists of property or assets which are administered by Trustees for
the benefit of beneficiaries. 
Page 170

Page 171

APPENDIX 2 
3.4 There are many Trusts set up to benefit a wider group of people and
(depending on the purpose for which the Trust is set up in the first place)
these Trusts may be charitable. These are the sort of Trusts with which
Councillors are likely to be involved. 
3.5 Whether or not it is charitable, a Trust is usually set up by an individual or a
group of people, giving property to named Trustees on certain specific
conditions. The gift and conditions are usually set out in a document known as
a Trust Deed. 
3.6 The Trust Deed may also give the Trustees, and others, certain power such
as the appointment or replacement of Trustees or the investment of funds etc.
These powers could include the power on the part of the Council to appoint
Trustees to act as the Council's representatives. 
3.7 This type of organisation may arise where an individual gifts land for the
benefit of the community such as a public park. The land would be given to
named Trustees to hold the ground for the benefit of the community, and the
Trustees would then administer the land in accordance with the terms set out
in the Trust Deed. 
Trustees Duties 
3.8 Trustees have the following duties: 
• a duty to act in accordance with the Trust Deed and protect the trust
assets
• a duty to comply with all legislation affecting the Trust including charity
legislation if the trust is a charitable trust
• a duty not to make a private profit from the position 
• a duty to act with the standard of care which an ordinary, prudent person
would show (higher standards of care are required of professionals in
relation to areas within their professional knowledge) 
Trustees Liabilities 
3.9 Trustees have the following liabilities: 
• To make good any deficiency where Trust property has been used for a
Trustee's own purposes or for purposes not in accordance with the
purposes of the Trust. 
• Personal liability for losses or claims where a Trustee has acted outside
the scope of the Trust deed. 
• Personal liability where the Trustee has not shown the required standard
of care. 
3.10 Unlike a limited company, a Trust has no separate identity from the Trustees.
Trustees are therefore personally liable for losses on contracts or claims by
third parties, although Trustees are entitled to an indemnity from the Trust
assets provided they act properly in incurring the liability. 
Page 171

Page 172

APPENDIX 2 
3.11 Trustees may remain personally liable even though they have retired (e.g. if
they have entered into a contract on behalf of the Trust) and should therefore
seek an indemnity from their successors. 
Trustees of Registered Charitable Trusts
3.12 Trustees of registered charitable trusts are subject to various duties and
liabilities under the general law including:
• a duty to ensure (where the Trust is a charity) that this is registered with
the Scottish Charities Regulator and that annual accounts and returns are
completed and sent. 
• Trustees may be liable to fines if they do not comply with the duty to make
returns. 
3.13 There are however additional duties and liabilities in terms of the Charities
and Trustee Investment (Scotland) Act 2005: 
3.14 Trustees must ensure that the charity complies with the 2005 Act.  Any breach
of these duties will be treated as misconduct in the administration of the
charity entitling OSCR to invoke its powers under Section 31 of the 2005 Act.
These include powers to suspend the trustees, to direct the charity to cease
representing itself as a charity or as a Scottish charity, to restrict the
transactions which may be entered into, or the nature or amount of payments
which may be made in the administration of the charity without OSCR’s
consent and to direct any third party holding property on behalf of the charity
not to part with it without OSCR’s consent. 
Common Good
3.15 Whilst there are some statutory restrictions on management and disposal of
Common Good land and funds (which have similarities with public trusts) they
are funds and trusts are owned entirely by the Council and fall outwith the
scope of this guidance. Decisions are taken by Councillors like any other
decision under the Council’s Scheme of Administration/Scheme of Delegation. 
Limited Company 
3.16 Limited Companies are often created to make the administration of an
organisation easier. Companies are separate legal entities which can enter
into contracts and employ staff. They can also sue and be sued and this can
protect the members of the company from individual, personal liability. (as
detailed below, however, Directors can still incur some personal liability). 
3.17  The most common forms of company which Councillors are involved in are: 
• Companies limited by share 
• Companies limited by guarantee 
Companies Limited by Shares 
3.18 Councillors are less likely to be nominated to a company limited by shares in
the normal course of Council business. This type of company will have a
share capital and the company allocates the shares to its member
(shareholders). In the event that the company is wound up, each shareholder
Page 172

Page 173

APPENDIX 2 
is liable to pay the amount equivalent to the nominal value of his or her
shareholding e.g. if a shareholder holds 100 £1 shares in the company they
would have to pay £100 in the event of winding up, even though the value of
the shares may be e.g. £6 on the open market. In return for this, shareholders
share the ownership of the company and its profits. This is normally done by
the company paying a dividend to its shareholders. The dividend is usually
declared on the basis of an amount of money per share held. In this type of
company the day to day management of the company is usually vested in the
Directors. The members ultimately control the company by electing the
Directors and deciding major issues at general meetings. 
3.19 Most local companies are companies limited by shares, paying dividends to
their shareholders (members). 
Companies Limited by Guarantee 
3.20  Companies limited by guarantee also have members who control the activities
of the company in the same way as above (i.e. electing Directors and making
decisions in general meetings). However, these companies do not normally
seek to make a profit, and do not therefore pay dividends to their members. In
the event of the company being wound up the members guarantee to make a
payment to the level of their guarantee (also this is usually a nominal sum of
e.g. £1). This type of company is more commonly used for voluntary and
public bodies, especially where charitable status is sought (a company limited
by shares cannot normally fulfil the criteria for registration as a charity). 
General Company Matters 
3.21  Where companies are limited by shares or limited by guarantee, the company
is controlled by reference to its "constitution" which is contained in the
Memorandum and Articles of Association. These documents are registered
with Companies House and set out the powers of the company and the rules
by which it is to be managed. 
3.21  Any act carried out by the company that is outside the powers set out in the
Memorandum will be unlawful and a Director involved in such an Act may be
personally liable for any resulting losses. 
3.22  The Articles of Association will usually provide for the business of the
company to be decided by the Members of the company acting in general
meeting. At such meetings the Members generally elect a Board of Directors
who then deal with the day to day management of the company. In some
cases the Articles may provide for the Board to elect further Directors, in
certain specified circumstances. 
3.23  In some situations, the Council nominates Councillors to act as "observers" on
the Board of Directors of a company. Although such observers would not be
classed as Directors for most purposes, Councillors should be aware that if an
observer's involvement increases, to such an extent that it could be said that
there is an active engagement in the management of the company, they may
be deemed to be a "shadow director" which may entail liability for losses etc. 
Page 173

Page 174

APPENDIX 2 
3.24 Once elected to the Board, a Director has a number of duties and liabilities
under general company law. The fact that a Director is appointed to the Board
as a representative of the Council does not diminish his duties. The Director
will be an agent of the company, whose prime duties and responsibilities are
as follows:- 
3.25 Director's Duties 
1. A "fiduciary" duty to the company (not individual shareholders) to act
honestly and in good faith and in the best interest of the company as a
whole. This duty is similar to that owed by Councillors to Moray
constituents. 
2. A duty to act in accordance with the company’s constitution 
3.  A general duty to take reasonable care and skill in acting in the company's
affairs including seeking professional advice when this is necessary. 
4.  A duty to exercise independent judgement when dealing with the
company's affairs, rather than acting in accordance with a direction from
another body represented by the Director (such as the Council in the case
of a Director nominated by the Council). A Director representing another
body may take into account the views of that body but cannot allow them
to rule against the company's best interest. 
5.  A duty to avoid conflicts of interest. The interests of the Council and the
company may conflict, but the Director's primary duty is to the company
and not the other organisation he / she is representing. 
6.  A duty not to make a private profit from their position. Directors must
therefore disclose any interest they or their family may have in relation to
the company's contracts and only take further part in the discussions to
the extent which the governing Articles permit. 
7.  A duty to ensure that the legislation contained in the Companies Acts is
complied with e.g. submission of accounts. Failure to do so can lead to
disqualification as a Director. These duties are normally undertaken by the
company secretary. 
8.  A duty to have regard to the likely consequences of any decision on the
company’s long term interests, the interest of the company’s employees,
and to have a regard to the impact of the company’s operations on the
community and the environment. 
9.  A duty to act fairly between members of the company 
10. A duty to not accept a benefit from a third party conferred by reason of his
being a director or his doing or not doing anything as Director   
3.26 Director's Liabilities 
Page 174

Page 175

APPENDIX 2 
Personal liability will arise in the following circumstances: 
1.  Liability to third parties where a company acts outside of its powers, and
the Director knowingly causes or permits the company to so act. 
2.  Liability to members of the company for breach of trust, if he/she
misapplies the money or property of the company. Directors may also be
liable if they fail to take action to prevent the breach of a co-Director of
which they are aware. 
3.  Liability to the company for any losses sustained where a Director abuses
their position in some way, or fails to act in the best interest of the
company. 
4.  Liability for losses caused by a Director who fails to exercise the requisite
level of skill and care (and fails to seek appropriate advice). 
5.  Liability to contribute towards the company's assets where a Director
knows or ought to know that there is no reasonable prospect of the
company avoiding liquidation, but allows the company to continue to
trade. This is called Wrongful Trading. A Director should alert his fellow
Directors and the company's auditors where they are concerned about the
company's position and seek advice as necessary. 
6.  Liability for Fraudulent Trading i.e. where a company deals with the intent
of defrauding creditors or others. As well as a fine a Director may be
disqualified from acting as a Director in another company. 
7.  Liability to pay damages where the Director deals with an individual or
another company, who/which believes that the Director is authorised to so
act, when in fact they have no such power. 
3.27 Councillors who are Directors of companies to which they have been
nominated by the Council are also under the following obligations: 
(a)  to ensure that the remuneration they receive from the company should not
exceed prescribed limits, and should be registered and declared; 
(b)  to give information to Councillors about their activities as required by the
Council (apart from confidential information); and 
(c)  to cease to be a Director immediately upon disqualification as a
Councillor. 
Unincorporated Associations 
3.28  "Unincorporated Associations" cover a wide range of bodies. Unlike
companies, they have no separate legal identity. They consist of a group of
people who have come together for a common purpose and agreed to work
together under a common set of rules. The rules often take the form of a
Page 175

Page 176

APPENDIX 2 
written constitution, which will set out in detail how the organisation is to
operate. In joining a group each member agrees to abide by the constitution. 
3.29 Normally, the constitution will provide for the election by the members of a
management committee which will be responsible for the everyday running of
the organisation. The constitution may also provide members to have annual
general meetings to deal with business such as the accounts, appointment of
the management committee etc. 
3.30 Depending on the purpose for which the association is formed and the rules
governing it, an association may be charitable and therefore require to register
as a charity. 
3.31 Because an association is not a separate legal entity, it cannot hold property
in its own name. Any property which the association controls will have to be
vested in an individual or individuals who are usually called the Trustees of
the Association. They will usually hold the assets subject to the direction of
the members, or (more usually) the management committee. 
3.32 Duties 
1.  The members of the management committee, and the Trustees appointed
to hold any assets for the association, must act within the constitution and
must take reasonable care in exercising their powers. 
3.33 Liabilities 
1.  The management committee members are liable for the acts or omissions
or the organisation, but are entitled to an indemnity from the funds of the
organisation if they have acted properly. If there are not enough funds, the
committee members are personally liable for the shortfall. Management
committee members can ask all of the members of the association to
indemnify them for the shortfall in relation to a particular obligation. It is
possible (subject to rules in the constitution) for insurance to be taken out
to cover Trustees and members of the management committee for the
liability. Because the Council cannot arrange this insurance, Councillors
who are Trustees or management committee members should satisfy
themselves that the Trust has adequate insurance to cover them. 
2.  Where members have acted outside their authority they may be liable to
the members and any third party affected by their actions, for any losses
sustained. 
4. DECISION MAKING ON OUTSIDE BODIES 
4.1 In carrying out their duties as a Trustee, Director or Management Committee
Member, Councillors must take decisions without being influenced by the fact
that they are a Councillor. Their primary duty in acting as a representative
making management decisions for the outside body is to make these
decisions in the interests of that organisation. Councillors should always
Page 176

Page 177

APPENDIX 2 
ensure that their fellow Directors/Trustees are aware of the fact they are
Councillors. 
4.2 Councillors may take account of the wishes of the Council when dealing
directly with the affairs of the outside body, but this must come after the best
interests of the outside body.  Accordingly, Councillors should not take
decisions for the outside body simply on the basis of the Council’s wishes. 
They should properly consider all the relevant issues, including the Council’s
views and take a reasoned decision in the best interests of the organisation. 
5. INSURANCE ISSUES WITH OUTSIDE BODIES 
5.1 Because Councillors and officials who serve as Directors of companies or in
other decision making capacities on outside bodies, serve the particular body
rather than the Council, the Council cannot indemnify them against any claims
brought against them personally.  Where there is any possibility of legal
liability therefore the company or outside body should put in place appropriate
insurance cover to cover its Directors, officers, members etc. 
5.2 The Council’s insurance cover will extend to Councillors and Council officials
assisting outside organisations as advisors or observers, either facilitating
exchanges of views or information as an extension of their Council duties or
otherwise representing the Council, but the Council’s insurance cover does
not extend to indemnify Councillors and officials who serve in an executive
capacity on an outside body.  Councillors and officials should be clear that if
they serve on an outside body as decision makers they do so in a personal
capacity.  Outside bodies on which Councillors or officials serve therefore
should have their own insurance cover. 
Page 177

Page 178

Page 178

Page 179

REPORT TO: CORPORATE COMMITTEE ON 27 AUGUST 2024 
SUBJECT: REVIEW OF COMMUNITY COUNCIL SCHEME AND ELECTION
ARRANGEMENTS 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To invite the Committee to consider and approve the arrangements for the
review of the Moray Council Scheme for the Establishment of Community
Councils and the future Community Council elections. 
1.2 This report is submitted to Committee in terms of section III (B) (47) in terms
of exercising the functions of the Council in connection with Community
Councils. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee agree to approve the:- 
(i) framework for the review of the Council Scheme for the
Establishment of Community Councils; and 
(ii) arrangements for the Community Council elections, noting financial
implications, as detailed in the report. 
3. BACKGROUND 
3.1 The Local Government (Scotland) Act 1973 requires local authorities to set
schemes for the establishment of Community Councils (CC) in their area
outlining various arrangements including a framework for CC formation,
meetings, boundaries and administration. Periodically it is appropriate to
review the CC scheme, prior to CC elections, and any amendments made
come into effect at the next scheduled election. The proposed timetable and
an outline of review process are shown in APPENDIX 1.  
Item 16.
Page 179

Page 180

3.2 During the administration of the current CC term 2021-2025 situations have
arisen which perhaps required clarity in the scheme and review or
amendments have been suggested. These are outlined in APPENDIX 3.
These initial specific areas will form part of the review alongside any
consultation responses. Members also have the opportunity to take part in the
two stage consultation period. 
3.3 None of the CC boundaries have been identified for amendment prior to the
review; but will be part of the consultation process and suggested
amendments may come forward. 
3.4 During the review an amended scheme will be open for public consultation, as
per the timetable noted. The review will be conducted with the assistance of
the Community Council Liaison Officer (CCLO). Once this process is complete
the final CC scheme, with any further amendment, will be brought back to a
future meeting prior to the Scottish Parliament elections for final approval. 
4. COMMUNITY COUNCIL ELECTIONS ARRANGEMENTS 
4.1 CC elections are scheduled to be conducted from August -September 2025
with a poll date set in October 2025; an indicative timetable is outlined in
APPENDIX 2. 
4.2 The Scheme of Electoral Arrangements for Community Councils will be
reviewed in consultation with the Returning Officer, alongside the review
noted above. 
4.3 Awareness of the CC elections will be undertaken by CCLO and Democratic
Services utilising as far as possible existing avenues of communication. As
with previous CC elections, CCs will be actively encouraged to engage in their
own promotion and awareness of the CC elections with the support of the
CCLO. 
4.4 As an indication, during the 2021 CC elections, 14 Community Councils were
established without contest and 6 did not form, however 3 petitioned to form,
with 1 being contested and a postal ballot was held. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
CC’s contribute to community engagement and form part of the
representative groups supporting and informing sustainable services.
The Corporate plan values state that the Council will be responsive,
promoting community participation and involvement and will listen to,
and involve communities. 
(b) Policy and Legal
Local Government (Scotland) Act 1973 – the Local Authority must
provide a scheme for establishment of Community Councils in their area.
Local Government etc. (Scotland) Act 1994 continues this provision.
Page 180

Page 181

(c) Financial implications
Review of Scheme - There will be some limited financial implications
from the review related to the statutory publication of public notices and
general administration in corresponding with CC’s and consultees
estimated at £250. 
Community Council Elections (Nominations) – There will be financial
implications for year 2025/26 related to the production of nomination
papers and from the publication of the notice of poll which will be
provided in print and online for download by the public, and
administration costs in corresponding with candidates. Costs are
estimated at £1,500 based on 2021 CC Election costs. 
Community Council Elections (Poll) in Year 2025/26 – There will be a
financial implication relating to the production of further public notices
and potentially postal votes, their postage and return in the event that a
CC or sub-division is contested. This cost cannot be forecast accurately
as it cannot be predicted how many CC electoral areas will be contested
nor how many postal votes will be issued or returned. As an indication in
2021 there was 1 election, 2017 CC Elections there were no contests, in
2013 five sub-divisions were contested with the total cost amounting to
£13,700. 
(d) Risk Implications
As noted under (b) and (c). 
(e) Staffing Implications
There are staffing implications for Democratic Services and the CCLO in
undertaking the review of the scheme and the administration of the
election which will be met within existing resources. 
Should any of the CCs be contested during the election in 2025/26 and a
poll administered, additional staffing resources may be required for the
purposes of preparation of the postal votes and the count. This
requirement cannot be forecast at the present time as it is unknown how
many, if any, of the CCs will be contested. However it is likely that if the
requirement is for a low number then this will be met through utilising
existing resources in Democratic Services. 
(f) Property
None 
(g) Equalities/Socio Economic Impact
Equalities runs as a strong theme within the CC scheme, code of
conduct and CC members’ handbook. These provisions will be reviewed
alongside other material in the scheme. Standard provisions relating to
accessibility of election materials will apply as in all other elections. 
In relation to this report, it was determined following consultation with the
Equalities Officer that at this initial stage an Equalities Impact
Assessment was not required.
Page 181

Page 182

(h) Climate Change and Biodiversity Impacts
None associated with this report 
(i) Consultations
Consultations in the preparation of this report have been undertaken with
the Returning Officer, Head of Governance, Strategy and Performance,
Communities Service Manager, Community Learning and Engagement
Team Manager, Community Council Liaison Officer, and the Equalities
Officer. 
6. CONCLUSION 
6.1 The Council has a statutory duty to maintain a scheme for the
establishment of Community Councils within their local authority area.
Due to the scheduled Community Council elections in autumn 2025, it is
pertinent to review the scheme in light of issues that have arisen in the
current term. Thereafter elections will be held based on the amended
scheme. 
Author of Report:  Tracey Sutherland, Democratic Services Manager 
Background Papers: n/a
Ref: 
Page 182

Page 183

SPMAN-2045703626-407
APPENDIX 1
Community Council Scheme Review Process
Prior to Community Council (CC) elections, the Moray Council (TMC) periodically reviews the
current scheme and associated documents. The Moray Council Scheme of Establishment for
Community Councils (CC scheme) was last reviewed in 2017. The next Community Council
elections are due in autumn 2025. 
The review is a two stage process;
• The first public consultation asks for proposals for amendments to be submitted for
inclusion in a proposed CC scheme for 2025 – 2029. 
• The second public consultation asks for comments on the proposed scheme. 
Thereafter the proposed CC scheme and representations are reported to, and considered at
a meeting of the Moray Council. 
The Council may amend the proposed CC scheme in accordance with the representations. If
proposals are amended, further public notice and opportunity for comment (4 weeks) will
be given. 
Report submitted to meeting of Corporate Committee
to review scheme
Public Notice given for intention to review CC Scheme
inviting proposals
1st Phase Consultation comments published
Draft Proposed CC Scheme 2025 – 2029 published
with further public notice
Comments submitted by stakeholders to the
consultation
Comments submitted by stakeholders to the
consultation
- 2nd Phase Consultation comments published
- Draft Proposed CC Scheme 2025 – 2029 revised
and submitted to meeting of TMC for approval
Further consultation phase (4 weeks), if required if
amendment made at TMC meeting
1st
consultation
phase
(8 weeks)
2nd
consultation
phase
(8 weeks)
Draft CC Scheme 2025 – 2029 drafted with revisions
to associated documents
Item 16.
Page 183

Page 184

SPMAN-2045703626-407
Associated CC documents which form part of the CC scheme or supplement CC
administration are also reviewed simultaneously:
- CC Mapping, boundaries and sub-divisions
- Model Constitution and Standing Orders templates
- Electoral Arrangements for CCs
The statutory basis for reviewing community council schemes is set out in the Local
Government (Scotland) Act 1973 s.53 and supplemented the Local Government etc.
(Scotland) Act 1994 s22. 
The proposed CC Scheme review timetable is shown below and is subject to final
confirmation when the public notice of review is published.
First report to Corporate Committee with intention to
review scheme  Tuesday 27 August 2024
Public notice of intention to review 
1st Stage consultation commences  28 August 2024
1st Stage consultation ends (8 weeks)  Wednesday 23 October 2024
Report to Corporate Committee 5 November 2024
Proposed CC Scheme published and 2nd Stage
consultation starts  6 November 2024 
2nd Stage consultation ends (8 weeks)
(excludes Christmas week)  15 January 2025
Second report to Corporate Committee with proposed
CC Scheme 28 January 2025
Final, 4 week consultation period for amendments
arising – if required  29 January 2025 
------  
Page 184

Page 185

SPMAN-2045703626-407 
Page 185

Page 186

Page 186

Page 187

SPMAN- 2045703626-438
APPENDIX 2 
Draft Community Council Elections 2025
(Provisional) Election Timetable* 
Last date for application to the Electoral
Register  TBC
Notice of Election - 
Publication of public notice calling for
Nomination of Candidates 
Monday 
18 August 2025
First time for candidates to lodge
nomination papers  
Tuesday 
19 August 2025
Latest time for candidates lodging
nomination papers 
Not later than 4pm on Thursday 
2 October 2025
Final date for the withdrawal of nominations  4pm on Thursday 
2 October 2025
Declaration of Community Council
established, if uncontested 
5pm on Thursday 
2 October 2025
Start of new term for uncontested
Community Councils 
Monday 
6 October 2025
Publication of Notice of Poll for contested
seats/Community Councils (if required)  Thursday 2 October 2025
Postal votes for all contested areas prepared and printed
Last day for Postal Votes to be issued for
Contested Seats*
By  -
11
Wednesday 
22 October 2025
Close of Poll (if required) 0 Thursday 
30 October 2025
Counting of Votes +5  By Thursday 
6 November 2025
Declaration of Community Council
established (contested) 
(Election Results)
+5 By Thursday 
6 November 2025
* subject to review of the electoral scheme of arrangements for community council 
Item 16.
Page 187

Page 188

Page 188

Page 189

SPMAN - 2045703626-437
APPENDIX 3 
Specific issues for consideration as part of the Community Council Scheme
Review
1) Roles and Responsibilities
Review Community Council (CC) Scheme to review list of roles and responsibilities and
make reference to the National Standards of Community Engagement. 
2) Membership Numbers and CC Boundaries
Review number of CC’s, membership numbers and boundaries to ensure there are still
appropriate and current with regard to changes in the Local Development Plan,
electorate, population and communities. 
Consider if small boundary reviews could be completed without a full review of the
Scheme of Establishment. 
Confirm Membership status for office holders. Associate members cannot be a
chairperson. Confirm requirements of secretary as the property of the CC is invested in
the office holders. Also consider other membership options for young people and
members of the Youth Parliament to increase participation. 
3) Meetings
Review scheme and amend if appropriate making provision for remote meetings during
exceptional circumstances.
Consider how other local groups report to CCs and links are made with other community
organisations. 
4) Supported Status
Update provisions and guidance notes in relation to ‘supported status’ and the support
offered by the CCLO when a CC faces issues with internal disputes and membership
issues. 
5) Data Protection
Review scheme in relation to provisions of General Data Protection Regulations and
amend CC scheme in relation to the publication of personal contact details for members
and on ballot papers and election notice during elections.  
Item 16.
Page 189

Page 190

SPMAN - 2045703626-437 
6) Making reference to new policies developed during the current term
The Community Council Liaison Officer, working with the Joint Community Councils for
Moray (JCC), has developed guidance and policies for the CCs to adopt during meetings
and also to allow them to gain external funding by having specific policies in place during
the current term. This includes theSubcommittee policy and Social Media Policy. .
Review wording within the CC scheme to make reference to new policies and endorse
them, if appropriate. 
Consider other policies that are required for good governance of CCs. 
7) Equalities and Inclusion 
Review provisions in this section of the CC scheme to ensure they are current. 
8) Dissolution 
Update provisions and guidance notes in relation to dissolution of a CC. 
Page 190