Agenda Document Pack - Corporate Committee - 29/08/2023

Moray Council · 29 August 2023
Back to Corporate Committee — 29 August 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Corporate Committee 
Tuesday, 29 August 2023 
NOTICE IS HEREBY GIVEN that a Meeting of the Corporate Committee is to be
held at Council Chambers, Council Office, High Street, Elgin, IV30 1BX on
Tuesday, 29 August 2023 at 09:30. 
BUSINESS 
1. Sederunt 
2. Declaration of Group Decisions and Members Interests * 
3. Resolution
Consider, and if so decide, adopt the following resolution:
"That under Section 50A (4) and (5) of the Local Government
(Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Item 18 of business
on the grounds that it involves the likely disclosure of exempt
information of the class described in the relevant Paragraphs of Part 1
of Schedule 7A of the Act.”   
4. Minute of meeting of 13 June 2023 7 - 10
5. Written Questions ** 
6. Revenue Budget Monitoring to 30 June 2023
Report by Depute Chief Executive (Economy, Environment and
Finance)
11 - 30
7. Capital Plan 2023-24
Report by Depute Chief Executive (Economy, Environment and
Finance)
31 - 46
8. Proposed Self Catering Unit Transfer Policy
Report by Depute Chief Executive (Economy, Environment and
Finance)
47 - 50
Page 1

Page 2

9. Common Good Funds - Summary Expenditure for 2022-
23 and Estimates Disposable Income for 2023-24
Report by Depute Chief Executive (Economy, Environment and
Finance)
51 - 70
10. Procurement Annual Report for 2022-23 and
Procurement Strategy 2023-26
Report by Depute Chief Executive (Economy, Environment and
Finance)
71 -
136
11. Trust Funds - Summary Expenditure for 2022-23 and
Estimates Disposable Income for 2023-24
Report by Depute Chief Executive (Economy, Environment and
Finance)
137 -
146
12. Draft Allotment Regulations - Public Consultation
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
147 -
178
13. Armed Forces Covenant Update
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
179 -
184
14. ICT and Digital Strategy and Plan 2023-2026
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
185 -
210
15. Corporate Risk Register
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
211 -
238
16. Information Reports - if called in 
17. Question Time ***
Consider any oral question on matters delegated to the Committee in
terms of the Council's Scheme of Administration. 
Item(s) which the Committee may wish to consider with
the Press and Public excluded   
18. Common Good Site in Forres
• 4. Information relating to any applicant or recipient of any financial
assistance provided by the Authority;
• 9. Information on terms proposed or to be proposed by or to the
Authority; 
Page 2

Page 3

Summary of Corporate Services Committee functions:
To regulate, manage and monitor the finances of the Council both
capital and revenue; to deal with staffing policies and practices other
than for teaching staff; to deal with equal opportunities policies and
practices; to deal with procurement policies and priorities; to deal with
all matters relating to the Council’s duty to initiate, maintain and
facilitate Community Planning; to ensure that the organisation,
administrative and management processes of the Council are designed
to make the most effective contribution to achieving the Council’s
objectives; to provide all central support services; to exercise the
functions of the Council in connection with the Registration of Births,
Deaths and Marriages; to deal with valuation and electoral registration
matters.     
Information Reports - Not for Discussion at this Meeting
Any member wishing to call in a noting or information report from one
meeting shall give notice to Committee Services at least 48 hours
before the meeting for which the report is published. The Notice shall
be countersigned by one other elected member and shall explain the
reason for call in including any action sought. 
Information Report - Sundry Debt Write-Off Information
for 2023-24
Report by Depute Chief Executive (Economy, Environment and
Finance)
239 -
242 
Page 3

Page 4

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how
the individual or members of the group will vote on any item(s) of business on
the Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any
relevant and competent business within the specified remits not already on the
agenda, to the Chair provided it is received by the Proper Officer or Committee
Services by 12 noon two working days prior to the day of the meeting.  A copy
of any written answer provided by the Chair will be tabled at the start of the
relevant section of the meeting.  The Member who has put the question may,
after the answer has been given, ask one supplementary question directly
related to the subject matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the
consent of the Chair. If a Member does not have the opportunity to put a
supplementary question because no time remains, then he or she can submit it
in writing to the Proper Officer who will arrange for a written answer to be
provided within 7 working days. 
*** Question Time - At each ordinary meeting of the Committee ten minutes will be
allowed for Members questions when any Member of the Committee can put a
question to the Chair on any business within the remit of that Section of the
Committee.  The Member who has put the question may, after the answer has
been given, ask one supplementary question directly related to the subject
matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than ten minutes
after the Committee has started on the relevant item of business, except with
the consent of the Chair.  If a Member does not have the opportunity to put a
supplementary question because no time remains, then he/she can submit it in
writing to the proper officer who will arrange for a written answer to be provided
within seven working days. 
Page 4

Page 5

MORAY COUNCIL 
Corporate Committee 
SEDERUNT 
Councillor Bridget Mustard  (Chair)
Councillor Kathleen Robertson  (Depute Chair)  
Councillor Theresa Coull  (Member)
Councillor John Cowe  (Member)
Councillor John Divers  (Member)
Councillor Amber Dunbar  (Member)
Councillor Jérémie Fernandes  (Member)
Councillor Sandy Keith  (Member)
Councillor Graham Leadbitter  (Member)
Councillor Marc Macrae  (Member)
Councillor Paul McBain  (Member)
Councillor Shona Morrison  (Member)
Councillor Derek Ross  (Member)
Councillor John Stuart  (Member)
Councillor Draeyk Van Der Horn  (Member)  
Clerk Name: Lindsey Robinson
Clerk Telephone: 07966 120593
Clerk Email: committee.services@moray.gov.uk 
Page 5

Page 6

Page 6

Page 7

MORAY COUNCIL 
Minute of Meeting of the Corporate Committee 
Tuesday, 13 June 2023 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor Theresa Coull, Councillor John Cowe, Councillor John Divers, Councillor
Amber Dunbar, Councillor Jérémie Fernandes, Councillor Sandy Keith, Councillor
Graham Leadbitter, Councillor Marc Macrae, Councillor Paul McBain, Councillor
Shona Morrison, Councillor Bridget Mustard, Councillor Kathleen Robertson,
Councillor Derek Ross, Councillor John Stuart 
APOLOGIES 
There were no apologies submitted. 
IN ATTENDANCE 
Also in attendance at the above meeting were the Chief Executive, Depute Chief
Executive (Economy, Environment and Finance), Depute Chief Executive
(Education, Communities and Organisational Development), Chief Financial
Officer, Head of Governance, Strategy and Performance, Head of HR, ICT and
Organisational Development, Communities Service Manager and Tracey
Sutherland, Committee Services Officer.   
1.         Chair 
The meeting was chaired by Councillor Bridget Mustard.  
2.         Declaration of Group Decisions and Members Interests * 
In terms of Standing Orders 21 and 23 and the Councillors’ Code of Conduct, there
were no declarations from Group Leaders or Spokespersons in regard to any prior
decisions taken on how Members will vote on any item on the agenda or any
declarations of Member’s interests in respect of any item on the agenda. 
3.         Minute of the meeting of the Corporate Committee on 25 April 2023 
The minute of the meeting of the Corporate Committee dated 25 April 2023 was
submitted and approved.   
4.         Written Questions ** 
The Committee noted that no written questions had been submitted.   
5.         Human Resources, ICT and Organisational Development and Strategy
Governance and Perfomance Services' Service Plans 2023-24 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) invited the Committee to consider the Human
Item 4.
Page 7

Page 8

Resources, ICT and Organisational Development and Strategy Governance and
Performance services’ Service Plans for 2023-2024.  
Following consideration the Committee agreed to approve the Service Plans for
services within Human Resources, ICT and Organisational Development and
Governance, Strategy and Performance.  
6.         Financial Service Plan 2023-24 
A report by the Depute Chief Executive (Economy, Environment and Finance)
invited the Committee to consider and agree the Financial Services Plan for 2023-
24/  
Following consideration the Committee agreed to approve the Service Plan for
Financial Services (Appendix 1).  
7.         Community Rental Support - Annual Review 
A report by the Depute Chief Executive (Economy, Environment and Finance)
invited the Committee to consider the level of rental support awarded to voluntary
and community organisations (VCOs) occupying Council property under legacy
arrangements and the Council’s Scheme of Delegation for short-term low-value
concessions and to consider options for the review of the level of support provided
through community rent rebates.  
Following consideration the Committee agreed to:  
i) note that no rental support was approved under the Scheme of Delegation
for short-term low-value rental concessions during the financial year
2022/23;    
ii)   note the extent of long term rental support provided under the legacy
arrangements detailed in Appendix 1;     
iii)  note the extent of rental support provided under the Community Rent
Rebate arrangements detailed in Appendix 2; and     
iv)  cancel all rebates when the related rent is due to be reviewed, whether or
not the rent review is implemented, and require the beneficiary to re-apply if
they wish the rebate to continue.     
8.         Performance Report (Financial Services) Period to March 2023 
A report by the Depute Chief Executive (Economy, Environment and Finance)
informed the Committee of the performance of the service for the period to 31
March 2023.  
Following consideration the Committee agreed to:  
i) note performance in areas of service planning, service performance and other
related data to the end of March 2023;    
ii) note the actions being taken to improve performance where required. 
Page 8

Page 9

9.         Corporate Asset Management Plan 
A report by the Depute Chief Executive (Economy, Environment and
Finance) provided the Committee with a report of progress made against the
Corporate Asset Management Plan for 2022/23 and to consider targets for
2023/24.  
Following consideration the Committee agreed to:  
i) note the work done to date to meet the targets set in the Corporate Asset
Management Plan for 2022/23 as set out in paragraphs 4.1 to 4.6;     
ii)  note the status of Asset Management Plans for each type of asset as set
out in Appendix 2; and     
iii)  approve the actions included in the Corporate Asset Management Planfor
2023/24 as set out in paragraph 5.1. 
10.         Devolved School Budgets - Carry Forward 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) sought Committee’s decision on whether to allow
schools to carry forward budget spend which was for the current financial year
however did not go ahead.  
Following consideration the Committee agreed to allow the following schools to
retain the following amounts for planned spend which has not been progressed:  
i) Newmill Primary School for £9,000
ii) Speyside High School for £118,652 
11.         Volunteering Policy Refresh 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) informed the Committee of the need to review our
current Volunteer Policy and to seek approval of the refreshed Moray Council
Volunteering Policy which has been redrafted in direct engagement with council
volunteers, community councils and other stakeholders.  
Following consideration the Committee agreed to adopt the refreshed Volunteer
Strategy to reaffirm the Council support for direct volunteering with council services
and within communities. 
12.         Performance Report (Human Resources, ICT and Organisational
Development) Period to March 2023 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) informed the Committee of the performance of the
service for the period to 31 March 2023. 
Following consideration the Committee agreed to: 
i) note performance in areas of service planning, service performance and
other related data to the end of March 2023;
Page 9

Page 10

ii) note the actions being taken to improve performance where required. 
13.         Performance Report (Governance, Strategy and Performance) Period
to March 2023 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) informed the Committee of the performance of the
service for the period to 31 March 2023. 
Following consideration the Committee agreed to: 
i) note performance in areas of service planning, service performance and
other related data to the end of March 2023;    
ii) note the actions being taken to improve performance where required. 
14.         Information Reports - if called in 
The Committee noted that no Information Reports had been called in. 
15.         Question Time *** 
Under reference to paragraph 10 of the minute of the meeting of 25 April 2023,
Councillor Divers confirmed that following his meeting with the Chief Executive, he
was assured of the reasoning for their being no Elected Members in attendance on
the sub group to advance the work of the Culture Working Group.  
In regards to the same point, Councillor Robertson said she was not aware of the
measurable outcomes being circulated.  
In response, the Chief Executive confirmed that he would check to ensure they
had been circulated.  He further added that a report of the findings would be
presented to the next meeting of Corporate Committee.    
He further added that he would re-issue the invitation to all groups to discuss the
options available around the Culture Working Group and the existing framework for
raising issues. 
Page 10

Page 11

REPORT TO:   CORPORATE COMMITTEE ON 29 AUGUST 2023 
SUBJECT: REVENUE BUDGET MONITORING TO 30 JUNE 2023 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To advise Committee of the revenue budget monitoring position to 30 June
2023. 
1.2 This report is submitted to Council in terms of Section III B (10) of the
Council's Administrative Scheme relating to monitoring current revenue
expenditure against approved budget.
.
2. RECOMMENDATION 
2.1 It is recommended that Committee considers and notes:  
(i) the budget monitoring position of £867,000 under budget for 2023/24
as at 30 June 2023; 
(ii) that this position consists of an underspend on Devolved School
budgets of £448,000, an underspend of £277,000 on Children’s
services, an underspend of £747,000 on Environmental and
Commerical Services, an overspend on Social Care services
delivered on behalf of the Moray Integration Joint Board (MIJB) of
£985,000 and an underspend on other services of £380,000; 
(iii) movement of a £162,000 decrease in the General Revenue Grant, as
detailed in paragraph 3.4; 
(iv) the emerging budget pressure noted in paragraph 6.3 for Bus
Revolution revenue, required to match the agreed business plan; 
2.2 It is recommended that the Council approves: 
(i) the use of ear-marked reserves for Covid of £74,000 as detailed in
paragraph 6.3. 
Item 6.
Page 11

Page 12

3. BACKGROUND 
3.1 When the revenue budget for 2023/24 was approved by Moray Council on 1
March 2023 (paragraph 5 of the minute refers), General Revenue Grant of
£193,416,000 was estimated for the year, based on the latest amount notified
to the Council and including estimates for further distributions of grant during
the year. Council Tax receipts of £49,574,000 were anticipated.  Budgeted
expenditure of £260,840,000 was agreed, and this required projected use of
£17,850,000 of the Council’s Ear Marked Reserves to balance the budget.   
3.2 In addition to the Council’s core budget, monies allocated to schools through
the Devolved School Management (DSM) scheme and not spent are brought
forward from previous years.  The DSM balance brought forward in 2023/24 is
£853,000 (2022/23 £1,288,000). Unused Pupil Equity Fund of £757,000
received in 2022/23 and £36,000 funding for nursery snacks and fundraising
have been carried forward into 2023/24 in accordance with the grant
conditions. 
3.3 On 28 June 2023 Council approved additional expenditure of £2,158,000 to
be funded from Ear-marked Reserve for Covid. All of these adjustments have
been posted to departments during quarter 1. 
3.4 The General Revenue Grant (GRG) has been adjusted by a reduction of
£162,000 to align with the latest finance circular available from the Scottish
Government as estimates for funding were used for amounts not yet known at
the time of preparing the original budget. The finance circular also contains
undistributed amounts which are not yet reflected in the GRG. When these
amounts are confirmed they will also be included. Further redeterminations of
funding have since been announced and will be reflected in the quarter 2
monitoring. 
3.5 With these adjustments the Council’s overall General Services revenue
budget currently stands at £264,848,000. 
3.6 Reconciliation of the movements in the base budget from that which was
approved by the Moray Council on 1 March 2023 is shown in APPENDIX 2
and allocations to departments from the provisions for Inflation and
Contingencies, Additional Costs and Savings are listed in APPENDIX 3. 
4. BUDGET POSITION 
4.1 APPENDIX 1 summarises the current position for each service area,
comparing the actual expenditure with the budget to 30 June 2023. 
4.2 Overall the budget position at 30 June 2023 is expenditure under budget to
date of £867,000 or 1.4% of budget to date, including services delivered on
behalf of the Moray Integrated Joint Board.   
4.3 The principal areas of overspend and underspend across the Council are
summarised below.
Page 12

Page 13

4.4 In Children’s Services, there is an underspend of £277,000.  A contract for
residential care for children with disabilities has ended due to the transition to
adult services of the person cared for, giving a contract underspend of
£141,000.  Out of Area placements are £79,000 under budget, although this
can quickly fluctuate given the cost per week of a placement.  Adoption and
fostering fees/allowances are under budget by £54,000.  Within Area Teams,
SDS/direct payments are £21,000 over budget to date. 
4.5 Education has a £465,000 under spend to date. Devolved School budgets are
underspent by £448,000 at the end of the first quarter; £151,000 in primary
schools and £297,000 secondary schools. There is flexibility in DSM budgets
to allow for planning for the sessions ahead and where spend is planned on
the academic year.There are other minor variances, both over and under
spends, within central Education budgets. 
4.6 Environmental and Commerical Services are presenting a £747,000
underspend to date; Waste has underspends on Leachate of £41,000 and
recycling of £14,000; Harbours income is ahead of target by £60,000; the
Consultancy budget is under spent by £178,000 in total which is partially due
to a £200,000 grant received in Emergency Planning from the Scottish and
Southern Electricity Networks (SSEN) Resilient Communities Fund, which is
aimed at helping communities become more resilient in the face of storms,
severe weather and prolonged power loss. Projects for the full grant amount
have been identified and agreed with SSEN, and include providing
Community support centres, household emergency plan and resilience
leaflets and emergency packs, an annual community resilience conference
and a battery pack loan scheme. All proposed spend will be presented to
Members. Other minor variances within Consultancy make up the net
variance. Roads Maintenance is £313,000 under spent to date: an additional 
budget of £300,000 for one year only for roads patching was approved as a
service development in the budget setting. The profiling of the works in this
area is giving a variance to date but is not expected to be an ongoing
variance; Catering has an £80,000 underspend on food costs, although
income is currently on target. Food costs are no longer as closely linked to
income as they were following the extension of universal Free School Meals
from Nursery to Primary 5.  Uptake may gradually rise as time goes on. This is
the same trend as last year which had a significant underspent on food costs.
Some food prices didn’t increase as much as anticipated last year but there is
expected to be an increase in wheat products as the situation in Ukraine is
affecting supplies.  Fleet are currently £98,000 under budget with variances in
income offsetting overspends in transport and plant costs, energy and
materials.  Lands and Parks are £17,000 over budget to date with small
variances on burial grounds, fuel and war memorials.  The Public Transport
Unit is currently over by £19,000 relating to Bus Revolution project costs (see
para 6.3). 
4.7 General Services Housing and Property is under spent by £49,000 in total
with positive and negative variances; Improvement Grants are under by
£49,000 due to a higher capital grant than currently budgeted to date;
Industrial Estates have underspends on repairs and income exceeding budget
Page 13

Page 14

to date; Homeless temporary accommodation is currently underbudget due to
additional income from the revised charges policy approved at Corporate
Committee on 31 January 2023 (para 8 of the minute refers), but additional
costs will follow for furniture and repairs. Schools repairs and maintenance are
£87,000 overspent which is due to the pattern of spend on school buildings;
energy costs in shared buildings are £28,000 over budget. Budget has been
set aside in inflation for energy costs and will be drawn down in quarter 2. 
4.8 The MIJB is reporting an overspend across services during quarter 1 of
£985,000.  The figures included in this report relate purely to the services
delivered by Moray Council on behalf of the MIJB. 
4.9  Income budgets across the Council are showing both positive and negative
variances.  Sports and leisure facilities budgets were reduced in 2021/22 due
to the effects of covid restrictions and they have been partially increased in
2023/24 and proposed to be back to pre covid level in 2024/25.  Income is
£100,000 ahead of target in quarter 1 and the budget adjustment will be
accelerated to reflect this.  In General Services Housing, Improvement Grants
are under by £49,000 due to a higher capital grant than currently budgeted for
to date, Industrial Estate income is ahead of target by £16,000 and (as per
para 4.7) Homeless temporary accommodation has additional income of
£35,000 to date.  Within Environmental and Commerical Services there is
additional income at this quarter 1 stage in Waste recycling services
(£14,000), Harbours (£60,000), Roads income from service users (£18,000)
and a surplus of £9,000 on burial ground interment fees, although there is an
income shortfall of £12,000 on sale of lairs.  Other income shortfalls include
Libraries income (£7,000) and Building Standards (£10,000). 
5. BUDGET PRESSURES & ADDITIONS 
5.1 Budget pressures recognised when the budget was approved on 1 March
2023 are released when the pressure crystallises to the extent that it can be
accurately quantified.  Provisions to meet budget pressures and new duties
totalling £3,575,000 have been released in quarter 1 and these are itemised in
APPENDIX 3. 
5.2 Provisions still held centrally at the end of quarter 1 total £11,694,000 and are
detailed in APPENDIX 4 and given a RAG assessment for likelihood of
requirement.   
5.3 Two provisions are assessed as red, as no longer being required. As per the
final report covering the delivery of the Economic Recovery Plan (reported to
Economic Development and Infrastructure Services Committee on 2 May
2023) the £53,000 budget pressure has been removed; and £30,000 for the
Deposit Return Scheme which was confirmed in Scottish Parliament in June
to be delayed until October 2025. 
5.4 Provisions totalling £326,000 are assessed as amber, for uncertainty of
requirement. These include the reduction in Early Learning and Childcare
specific grant of £190,000, with forecast expenditure being reviewed with the
service to assess requirements and a Change Management Plan being
Page 14

Page 15

implemented following consultants’ report; only £9,000 for DSM review  class
contact time is required as the temporary post to carry out this work is now
vacant, leaving a £9,000 saving. 
5.5 Two provisions that are classed as green have drawn down more than the
original allocation. Budget for the Public Private Partnership payments of
£272,000 was based on the September 2022 Retail Price Index (RPI) and the
annual unitary payment was based on Feruary 2023 RPI, which has given a
significant increase from the estimate. The Whole Family Wellbeing Fund
(WFWF) £545,000 is the 2023/24 funding allocation. Unspent funds from last
year have also been carried forward to be funded from reserves and it is
unlikely that the total of these will be spent in full this year. Decision on how
the funds are spent are made by the Community Planning Partnership and it
is therefore intended that any unspent funds at year end are put to an
earmarked reserve. The revised Improvement and Modernisation Plan (IMP)
of £1,302,000 is being reviewed with departments and a further update will be
reported to committee in November. 
5.6 All other provisions are expected to be required in full at this juncture. 
6. EMERGING BUDGET PRESSURES 
6.1 Emerging budget pressures are noted throughout the year as they are
identified.  There are two such budget pressures quantified during quarter 1. 
6.2 On 28 June 2023 Council approved temporary additional Additional Support
Needs (ASN) funding of £1,100,000 to support 10 schools and an early years
setting for session 2023/24, plus an additional recurring budget of £700,000 to
fund the alternative curriculum provision to maintain children in Moray and
prevent out of area placements. The total £1,800,000 will be funded from
covid reserves. 
6.3 The full Business Case for the Bus Revolution project, which is part of the
Moray Growth Deal, was approved at the Special meeting of Moray Council
on 8 March 2023 (para 9 of the minute refers). Capital costs over the life of
the project are funded by the Scottish Government as part of the overall
Growth Deal. The revenue costs and income will sit with the Council and, as
reported in March, the financial case indicates a subsidy requirement for the
first three years of the project. The projections as stated in the full business
case are that in 2023/24 the net revenue position is a budget shortfall of
£94,000. A budget pressure was included in the Council budget for £20,000
and this has been drawn down to fund software and marketing expenditure.
An additional £74,000 is required to balance the funding and approval for this
to be funded from covid reserves is requested. 
6.4 The budget will continue to be reviewed for any emerging pressures and
further recommendations will be made to future Committees when required.  
Page 15

Page 16

7. SAVINGS 
7.1 Savings and increased charges of £4,415,000 were approved when the
budget was set on 1 March 2023.  These savings comprised one-off savings
of £775,000 and other permanent savings of £3,490,000. The increase in
charges per the budget paper was £150,000. 
7.2 In addition to the savings approved when the budget was set, additional
savings/income of £1,480,000 was approved at Moray Council on 28 June
2023 (para 13 of the minute refers), including an increase of £400,000 for
Council Tax receipts. These are included on APPENDIX 5. 
7.3 The NESS Energy from Waste (EfW) facility began its commissioning phase
in February 2023, during which the plant processes limited amounts of waste
while assessments are carried out. The plant is expected to become fully
operational later in 2023. Until such time, temporary savings were expected to
emerge from additional income at Dallachy as it continues in operation. It is
not confirmed if this will be achieved in full and so will be monitored and
reported back. 
7.4 A one off saving of £50,000 will accrue from the refund due from Grampian
Valuation Joint Board, the amount of which will be confirmed when the
accounts  for 2022/23 are audited and approved by the Board – the saving will
be posted thereafter. 
7.5 Of the original approved savings, a balance of £2,344,000 remains in central
provisions as at the end of June. These are detailed in APPENDIX 5 and
given a RAG assessment for anticipated achievement. 
7.6 Seventeen savings totalling £3,242,000 are assessed as amber at this stage.
Several savings within Environmental and Commerical Services have been
delayed and their positions being confirmed. These include savings generated
from installing a salt store in Keith: build costs have escalated significantly and 
the business case will be updated to check it still yields savings before
committing to construction. Will be taken back to the Asset Management
Working Group if there is a significant variation in benefits. The hiring out of
Roads Maintenance machinery is delayed due to delays in delivery of
replacement vehicles, relating to the previously reported supply chain issues
for fleet. The saving from making permanent the move to 3 weekly recycling
collection has yet to be posted. The significant uplift in harbours commercial
income from offshore commenced in July and savings are still to be posted.
Increased Transportation and Consultancy recharges to capital haven’t yet
established in order to take the full saving. The Dallachy spare capacity
income (para 7.3) is currently also classed as amber at this point. 
7.7 Other savings assessed as amber include £30,000 from the use of purchasing
cards across services to ensure that VAT recipts are submitted per financial
regulations and therefore all input VAT reclaimed, and Property Services
admin review £26,000. The relocation of staff from Auchernack is dependent
on the sale as the saving is mainly from a reduction in NDR costs. The
Page 16

Page 17

savings relating to the Improvement and Modernisation programme (IMP)
Stream 2: ICT & Digital – schools admin has been out to consultation and the
Change Management Plan is completed. There will be a report to committee
in September and any update on  achieving the saving will be updated for
quarter 2 monitoring. Savings of £245,000 expected in Childrens Services
have slipped as the new contracts were late starting but will be posted to
departments later this year. 
. 
7.8 Unposted savings assessed as green are expected to be achieved or
substantially achieved during this financial year. 
8. RESERVES 
8.1 The balance on free general reserves (ie excluding DSM and ear-marked
reserves) as at 1 April 2023 was £5,000,000. This is the minimum level of
reserves that can be held on free general reserves. 
8.2 Moray Council on 28 June 2023 approved an additional use of covid ear
marked reserves totalling £2,158,000, as detailed in paragraph 3. (paragraph
13 of the Minute refers) . The variance analysis adjustments approved at that
meeting have also been reflected as a reduction in the use of reserves (due to
additional savings and income). The ASN budget pressure discussed in para
6.2 of £1,800,000 is also reflected. The impact of this is an estimated balance
of £5,022,000 at 30 June 2023. If approved, the Bus Revolution budget
pressure will also reduce this balance. APPENDIX 6 itemises the movements
on reserves during the year to date and gives the free balance on the
reserves at 30 June 2023. 
8.3 Balances at 30 June 2023 for other ear marked reserves are £3,791,000 for
Transformation and £5,122,000 for Council priorities. 
9. SUMMARY OF IMPLICATIONS 
(a) Moray 2026: A Plan for the Future and Moray Corporate Plan
Effective budget management is an essential component of delivery of
council priorities on a sustainable basis. 
(b) Policy and Legal
No policy or legal implications arise directly from the contents of this
report. 
(c) Financial implications 
The financial implications are addressed throughout the report. 
(d) Risk Implications
There are no risk implications arising directly from this report.  Budget
managers are aware of their responsibilities for managing their budgets
in accordance with the Council’s Financial Regulations.  There is a risk
to the Council arising from the agreement that if the Moray Integrated
Joint Board overspends the Council will meet 37% of the additional
costs incurred.  Rising inflation presents a rsik to the Council’s budget.
Page 17

Page 18

(e)  Staffing Implications  
No staffing implications arise directly from this report. 
(f)   Property  
No property implications arise directly from this report. 
(g) Equalities/Socio Economic Impact
No equalities implications arise directly from this report. 
(h) Climate Change and Biodiversity Impacts
No climate change and biodiversity impacts arise directly from this
report. 
(i) Consultations
Consultation concerning Revenue Budget Monitoring is an on-going
process with budget managers across the Council.  CMT and Heads of
Service have also been consulted in the preparation of this report and
any comments incorporated. 
10. CONCLUSION 
10.1 The financial position of the Council at the end of June 2023 is an
underspend against General Services Revenue Budget of £867,000
(including services delivered on behalf of the Moray Integration Joint
Board).   
10.2 Variations in General Revenue Grant totalling £162,000 have been
notified to the council. 
10.3 There is one additional budget pressure noted for Council services at
quarter 1; £74,000 for Bus Revolution revenue. If approved this would be
funded from covid ear-marked reserves. 
Author of Report: Susan Souter, Senior Accountant 
Background Papers: Held by author  
Ref:     SPMAN-1293228629-924 
Page 18

Page 19

APPENDIX 1
MORAY COUNCIL - APPENDIX 1
BUDGET MONITORING REPORT
QUARTER 1 to 30 JUNE 2023
Service
Revised Budget
2023/24
£000s
Budget to 30 June
2023
£000s
Actual &
Committed to
30 June 2023
£000s
Year to date
variance
£000s
Education, Resources & Community 13,670 4,026 3,943 83
Childrens Services 20,253 6,013 5,736 277
Education 96,998 26,487 26,022 465
General Services Housing & Property 4,234 1,022 973 49
Environmental & Commercial Services 28,471 7,004 6,257 747
Economic Growth & Development Services 3,446 398 371 27
HR, ICT & Organisational Development 6,186 2,472 2,364 108
Financial Services 1,859 770 753 17
Governance, Strategy & Perfomance 6,210 2,626 2,650 (24)
Other Services 2,653 728 686 42
SERVICES excl HEALTH & SOCIAL CARE 183,980 51,546 49,755 1,791
Health & Social Care (IJB) 58,176 12,520 13,505 (985)
Health & Social Care (Non IJB) 99 24 (37) 61
TOTAL SERVICES incl HEALTH & SOCIAL CARE 242,255 64,090 63,223 867
Loans Charges 14,407 0 0 0
Provision for Contingencies and Inflation 3,372 0 0 0
Additional Costs 7,158 0 0 0
Unallocated Savings (2,344) 0 0 0
TOTAL PROVISIONS 8,186 0 0 0
TOTAL GENERAL SERVICES EXPENDITURE 264,848 64,090 63,223 867
Commentary on Quarter 1 Performance
Overall the budget position at 30 June 2023 is expenditure under budget to date of £867,000 or 1.4% of budget,
including services delivered on behalf of the Moray Integrated Joint Board (MIJB).
Education: Devolved School budgets are underspent by £448,000 at the end of the first quarter; £151,000 in Primary
and £297,000 in Secondary schools.
Children's Services: underspend of £277,000 due to contract underspend for children transitioning to adult
services, and out of area placements under budget.
Environmental & Commercial Services: a £747,000 underspend across services including Roads Maintenance
underspend of £313,000, Catering food costs £80,000 under while income remains on budget, and a £200,000
grant from SSENs Resilient Communities Fund which is aimed at helping  communities become more resilient
when faced with severe weather.
6.3%
9.4%
41.3%
1.6%
10.9%
0.6%
3.9%
1.2%
4.1%
1.1%
19.5%
0.0%
Budget YTD
% of Total
Education, Resources & Community Childrens Services Education
General Services Housing & Property Environmental & Commercial Services Economic Growth & Development Services
HR, ICT & Organisational Development Financial Services Governance, Strategy & Perfomance
Other Services Health & Social Care (IJB) Health & Social Care (Non IJB)
6.2%
9.1%
41.2%
1.5%
9.9%0.6%
3.7%
1.2%
4.2%
1.1% 21.4%Actual YTD
% of Total
Education, Resources & Community Childrens Services Education
General Services Housing & Property Environmental & Commercial Services Economic Growth & Development Services
HR, ICT & Organisational Development Financial Services Governance, Strategy & Perfomance
Other Services Health & Social Care (IJB)
(1,200)
(1,000)
(800)
(600)
(400)
(200)
0
200
400
600
800
1,000
£000's
YTD Actual Variance to Budget (excl Loans & Provisions)
Education, Resources & Community Childrens Services
Education General Services Housing & Property
Environmental & Commercial Services Economic Growth & Development Services
HR, ICT & Organisational Development Financial Services
Governance, Strategy & Perfomance Other Services
Health & Social Care (IJB)
Item 6.
Page 19

Page 20

Page 20

Page 21

APPENDIX 2
Allocated
Budget
Provisions for
Contingencies
and Inflation
Additional
costs
Savings Budget Loan
Charges
Depreciation Total
Budget
£000s £000s £000s £000s £000s £000s £000s £000s
1 March 2023 231,397 4,182 15,269 (4,415) 246,433 14,407 260,840
School carry forwards 853 853 853
PEF carry forwards 757 757 757
ELC carry forwards 36 36 36
Funded from reserves - approved MC 28/06/23 2,158 2,158 2,158
Funded from Transformation Earmarked Reserve 76 76 76
Funded from Covid Earmarked Reserves 128 128 128
Adjustment 1 6,850 (5,908) (3,013) 2,071 0 0
Adjustment 2 - move inflation pot - 5,098 (5,098) 0 0
Corporate Committee 29/8/23 242,255 3,372 7,158 (2,344) 250,441 14,407 0 264,848
Item 6.
Page 21

Page 22

Page 22

Page 23

ALLOCATIONS FROM PROVISIONS
Provision for Contingencies and Inflation Committee
reference
£000s £000s
Approved when budget set: MC 1/3/23 4,182
Add in Inflation pot (approved as a budget pressure) MC 1/3/23 5,098
Pay awards (4,844)
Contract indices (665)
School/Community Transport (410)
Education DSM Adjustment 137
Members Allowances (32)
Other - Contingency (94)
(810)
Balance at 30 June 2023 3,372
Additional Costs £000s £000s
Approved when budget set: MC 1/3/23 15,269
Trf to Inflation pot (highlighted as a budget pressure) (5,098)
Budget pressures approved when budget set
ELC partner providers 5% increase (395)
Free School Meals (69)
Bus Revolution revenue funding (20)
Leachate - ongoing budget pressure (77)
Mid Term Loadline Survey - Dredger (30)
Fuel Costs - Waste (127)
Brown bin permits (34)
Reinstatement of the Employee Assistance Programme (15)
Homelessness provision and temp accommodation (220)
Donation to Moray Foodbank (20)
Ward budgets to address minor works/concerns (120)
Other (282)
(1,409)
Additional Budget Pressures approved
Raising Attainment (796)
(796)
Service Developments
Roads patching - one year only (300)
(300)
Additional funding allocated
Empty Property Relief (508)
(508)
Balance at 30 June 2023 7,158
APPENDIX 3 Item 6.
Page 23

Page 24

Savings & Charges Committee
reference
£000s £000s
Approved when budget set: MC 1/3/23 (4,415)
Empty Property Relief 44
TRO charges 16
Statutory fees for planning applications 110
Local Housing Energy Efficiency Strategy (LHEES) 50
Closure of Quarryhill 28
Cessation contract SACRO 142
Homelessness service charges 230
Children's Services - adoption, temp HoS 54
ASN contracts: Home Tuition, Call Scotland, SALT 60
Area Forums 4
Increase vacancy factor in line with pay awards 17
Income target per budget paper 181
936
Additional Savings Identified:
IORB MC 28/6/23 715
Development Services - Software Licences 11
Members Allowances/Expenses 20
HR - Professional fees 10
Increase in recharges to Capital/HRA 105
Income 219
Janitorial Restructure - DAR Aug 15 2
Temp Saving - LHEES 53
1,135
Balance at 30 June 2023 (2,344)
Page 24

Page 25

APPENDIX 4
BUDGET PRESSURES
Ref Description Original
Amount £000s
Drawn Down
£000s
Balance
£000s Status Comm
Ref
Reasons
RECOGNISED WHEN BUDGET SET
Social Work
Education Resources & Communities
School Transport - Additional ASN Costs 66,000 0 66,000 Likely to be required.  Will confirm once
requirements for 23-24 school year are
finalised. 
Free schools meals expansion April -
August
293,000 37,022 255,978 Catering have drawn down their
allocation for P4-5 UFSM. Education
requested full year effect of
Playground/Lunchtime auxiliaries which
has been drawn down. Within the FSM
provision is funding for holiday
provision. £210k is required to cover
the holiday provision, this includes the
£32k already drawn down therefore
additional £178k required.
Free School Meals holiday provision 80,000 32,299 47,701 Up to the summer holidays another
£98k required.
FSM Easter holiday provision 0
DSM / class contact time review 18,000 0 18,000 Balance of £9k is not required as
employee finished position early.
Temporary post, £9k saving in 24/25
Libraries loss of income from Passport checki 26,000 26,034 (34)
Education
Additional Teachers  285,000 0 285,000 Paper approving allocation has been
approved by committee - funding will be
drawn down in Qtr2
School roll numbers 700,000 43,371 656,629 Funding required will be known after the
23/24 academic year rolls are provided
in October
Backdated Jobsizing - DHT Cluny PS 0
ELC specific grant 190,000 0 190,000 Working with the service on forecasts
for the year
5% increase in sustainable rate ELC partner 395,000 395,000 0
* Education Investment Fund - short term
funding
500,000 0 500,000 MC 28/6/23 approved use of this
funding - will be drawn down
Economic Growth & Development
MGD revenue contribution STEM 3,000 3,000 0
Bus Revolution revenue 20,000 20,000 0 Additional BP identified of £74k to
match submission to the Scottish
Government
Development Plan Scheme -
transportation appraisals
100,000 0 100,000 Will be required but uncertain if the cost
will be this year or next.
Budget Pressures associated with
Economic Recovery Plan
53,000 0 53,000 No longer required
Renewables Income Fund 5,000 0 5,000 To be confirmed with the Climate
Change Team
Environmental & Commercial 0
Leachate - ongoing budget pressure 77,000 77,000 0
Mid Term Loadline Survey - Dredger 30,000 30,000 0
Fuel Costs - Waste 127,000 127,000 0
Brown bin permits 34,000 34,000 0
Deposit Return Scheme 30,000 0 30,000 Pushed back one year to 24/25
* Road Safety matters 50,000 0 50,000 Unsure if the contract has been
awarded in full.
Governance etc
Reduced admin funding from DWP for Housi 7,000 7,000 0
* Amount for each Ward (£15k) to address
minor works/concerns
120,000 120,000 0
Housing & Property Services
Homeless - higher costs of providing and
maintaining temporary accommodation for
increased levels of homeless
presentations
220,000 220,000 0
Financial Services
Procurement (additional 0.5FTE
Procurement Officer)
28,000 28,703 (703) Cost was slightly higher
Other
Item 6.
Page 25

Page 26

* Donation to assist local effort for relief of
suffering in Turkey/Syria
5,000 0 5,000
* Donation to Moray Foodbank (in addition
to 22/23 donation)
20,000 20,000 0
Cross Service
Reinstatement of the Employee Assistance P 15,000 15,000 0
NDR revaluation 400,000 0 400,000 Will be required and drawn down when
NDR bills processed
TU Provision 11,000 0 11,000 Drawn down as part of the funding from
reserves. MC 24/5/23
Increase in Loans Charges 2,000,000 0 2,000,000 Will likely be required and will be drawn
down for Q2
Removal of Statutory Mitigation for
Flexi/TOIL
173,121 (173,121) Annual Accounts entry
Total 5,908,000 1,408,550 4,499,450
Funded from Transformation Earmarked Reserves
Revised IMP:
Raising Attainment - TCH & SJC 1,302,000 796,409 505,591 This is the full year effect of the Raising
Attainment Transformation Funding
FSM Expansion 1,204,000 0 1,204,000
Whole Family Wellbeing Fund (WFWF) 545,000 0 545,000 Last years funding of £546k has been
carried forward in reserves  - it is
unlikely both amounts will be used this
year. Unspent will be put to an
earmarked reserve.
Empty Property Relief 508,000 508,000 0
SERVICE DEVELOPMENTS
Levelling Up Fund 221,000 0 221,000 Currently working on Levelling Up
submission round 3.  Likely to be
required
School real time data 63,000 0 63,000 In discussions with department
Youth work (Buckie and Forres) 120,000 0 120,000 Forres grants nearly completed and
Buckie applications to be in by August.
Roads patching - one year only 300,000 300,000 0
Total 2,961,000 808,000 2,153,000
Total 10,171,000 3,012,959 7,158,041
FUNDING FOR NEW DUTIES
Page 26

Page 27

SAVINGS APPENDIX 5
Ref Description Amount
£000s
Posted Balance Status Comm Ref Reason for balance
Approved when 2023/24 budget set:
Financial Services
Financial service restructuring (16,000) 0 (16,000) £39k saving taken in 22/23 as first
part of restructuring. This second
year saving needs reviewed
following staff changes.
Review of purchasing card (30,000) 0 (30,000) Cross-service saving
Empty Property Relief (44,000) (44,000) 0
Environmental & Commercial Services
Salt store (Keith depot) (35,000) 0 (35,000) Delays in design of structure, barn
not installed as yet and cost likely
to be higher than anticipated. 
Business case to be updated and
will be taken back through Asset
Management Working Group.
Roads maintenance - hire out machinery (100,000) 0 (100,000) Still awaiting tankers to be used for
this.  No date yet as to when likely
to be received and operational.
3 weekly recycling collection (136,000) 0 (136,000) Further discussions required re
use of crews and vehicles.
Temp Bus Stop Charges (2,000) 0 (2,000)
Harbours commercial income (336,000) 0 (336,000) Too early to say if the full saving
can be taken.
TRO charges (16,000) (16,000) 0
Transportation and Consultancy recharges (142,000) 0 (142,000) Too early to say if the full saving
can be taken.
Economic Growth and Development
Statutory fees for planning applications (110,000) (110,000) 0
Local Housing Energy Efficiency Strategy (LHEES) (50,000) (50,000) 0
Housing & Property Services
Closure of Quarryhill (28,000) (27,629) (371)
Cessation contract SACRO (150,000) (142,466) (7,534) Net saving lower than estimated
(mainly due to 22/23 pay award)
Property Services admin (26,000) 0 (26,000) Unclear where this saving will
come from - waiting for clarification
from service
Homelessness service charges (230,000) (230,000) 0
Integrated Children's Services
Children's Services - adoption, temp HoS (54,000) (54,169) 169
Schools
Service concession (1,168,000) 0 (1,168,000) Based on Arlingclose Treasury
Advisers calculations.
Education Resources and Communities
Relocate staff from Auchernack plus Forres Communi (20,000) 0 (20,000) Mostly relates to NDR and so is
dependent on sale of asset
ASN contracts: Home Tuition, Call Scotland, SALT (60,000) (60,000) 0
Area Forums (4,000) (3,950) (50)
Corporate/Cross service
Charges review - See Charges Tab 0
EV / ULE salary sacrifice (20,000) 0 (20,000) Saving can be taken if/when this is
rolled out.
Increase vacancy factor in line with pay awards (225,000) (17,000) (208,000) Waiting for pay award to be agreed
Improvement & Modernisation Programme:
Stream 2: ICT & Digital - Schools Admin (56,000) 0 (56,000) CMP completed - paper going to
committee in September
Stream 4: Review & Expansion of Flexible Working (44,000) 0 (44,000)
Care placements (245,000) 0 (245,000) The new contracts in Children
Services were late starting and it
will be 24/25 before it will be known
if they have generated savings.
Reduction in reinvestment costs (18,000) 0 (18,000) Saving to be taken in 23/24
LEAN review (125,000) 0 (125,000)
Item 6.
Page 27

Page 28

APPENDIX 5
Temporary Savings
Corporate
Grampian Valuation Joint Board - Refund (50,000) 0 (50,000) MC 8/3/23
Direct Services
Dallachy spare capacity - income (725,000) 0 (725,000) MC 8/3/23 NESS facility became operational
in April.  Waste now being
transported there.
Income (150,000) (181,000) 31,000 MC 8/3/23 Income has exceeded budget
Savings approved since budget set:
IORB (715,000) 715,000 MC 28/6/23
Development Services - Software Licences (11,000) 11,000 MC 28/6/23
Members Allowances/Expenses (20,000) 20,000 MC 28/6/23
HR - Professional fees (10,000) 10,000 MC 28/6/23
Increase in recharges to CapitalHRA (105,000) 105,000 MC 28/6/23
Income (219,000) 219,000 MC 28/6/23
Janitorial Restructure (1,614) 1,614 Restructure of janitorial staffing in
a secondary school.
Temporary Savings
LHEES saving (53,000) 53,000 MC 8/3/23
Total Approved when budget set (4,415,000) (936,214) (3,478,786)
Total Approved since budget set (1,134,614) 1,134,614
Total (2,344,172)
Page 28

Page 29

APPENDIX 6
General Reserves Committee
reference
Approved
£000s
Budget
released
£000s
General Reserves @ 1 April 2023 5,000
Free balance @ 30 June 2023 5,000
Transformation Ear marked Reserve Committee
reference
Approved
£000s
Budget
released
£000s
Balance @ 1 April 2023 5,480
Funding from reserves approved in 2023/24:
Poverty MC 15/09/21 (66)
Raising Attainment MC 15/09/21 (1,547)
Smarter Working MC 02/02/23 (76) (76)
(1,689) (76)
Free balance @ 30 June 2023 3,791
Covid Ear marked Reserve Committee
reference
Approved
£000s
Budget
released
£000s
Balance @ 1 April 2023 22,897
Less commitments against reserves when
budget was set:
To balance budget MC 01/03/23 (14,505)
Budget pressures re economic recovery (263)
Donation to assist local effort for relief of suffering in Turkey/Syria (5)
Donation to Moray Foodbank (in addition to 22/23 donation) (20)
Amount for each Ward (£15k) to address minor works/concerns (120)
Road Safety matters (50)
Education Investment Fund - short term funding (500)
Reinstatement of the Employee Assistance Programme (15)
(15,478)
Funding from reserves approved in 2023/24:
Trades Union Facility Time MC 25/04/23 (23) (23)
0.4fte Trade Union Education MC 24/05/23 (34) (34)
DAR Assistant Registrar / Clerical Assts Burial G 01/23 (72) (72)
Economic Growth & Development
Glenlivet Masterplan MC 28/06/23 (9) (9)
Scotland Loves Local Moray MC 28/06/23 (33) (33)
Business Gateway Economic Recovery and Brex MC 28/06/23 (24) (24)
Climate Change LHEES stages 1-5 MC 28/06/23 (15) (15)
Climate Change LHEES stages 6-8 MC 28/06/23 (9) (9)
Item 6.
Page 29

Page 30

APPENDIX 6
Governance
DHP Awards MC 28/06/23 (153) 153
Environmental & Commercial
Burial Grounds - Headstones Inspections MC 28/06/23 (10) (10)
Lands & Parks - Tree Inspections MC 28/06/23 (40) (40)
Children's Services
Syrian Refugee funding MC 28/06/23 (25) (25)
Ukrainian Refugees funding MC 28/06/23 (1,150) (1,150)
Unaccompanied Asylum Seeking Children fundingMC 28/06/23 (125) (125)
Mental Health Pandemic Response MC 28/06/23 (19) (19)
Whole Family Wellbeing Fund MC 28/06/23 (546) (546)
Other Adjustments:
GRG adj to bring into line with f/c 3/2023 (162)
Remove Budget pressures re economic recovery 263
ASN Budget Pressure (1,800)
Reduced use of reserves from addl
savings/income per Variance Analysis
MC 28/06/23 1,589
(2,397) (1,981)
Approved use of reserves (17,875)
Free balance @ 30 June 2023 5,022
Council Priorities ear marked Reserve Committee
reference
Approved
£000s
Budget
released
£000s
Balance @ 1 April 2023 5,881
Free balance @ 30 June 2023 5,881
Moray Growth Deal CF Reserve Committee
reference
Approved
£000s
Budget
released
£000s
Balance @ 1 April 2023 4,000
Less commitments against reserves when
budget was set:
MGD Cash Flow MC 01/03/23 (759)
Free balance @ 30 June 2023 3,241
Page 30

Page 31

REPORT TO: CORPORATE COMMITTEE ON 29 AUGUST 2023 
SUBJECT: CAPITAL PLAN 2023/24 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT &
FINANCE) 
1. REASON FOR REPORT 
1.1 To advise the Committee of expenditure to 30 June 2023 under the capital
plan for financial year 2023/24 and of estimates of projected expenditure
profiled into quarters. 
1.2 This report is submitted to Committee in terms of Section III (B) 9 of the
Council’s Administrative Scheme relating to monitoring progress of projects in
the approved capital plan including any revisions to the price or phasing on a
quarterly basis. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee: 
(i) Considers and notes expenditure to 30 June 2023 of £2,761,000; 
(ii) Considers and notes the current plan, prior to amendment of
£672,681,000 for 2023/24 based on approved expenditure adjusted
for known differences in planned expenditure which have been
identified to date, profiled into quarters, as set out in APPENDIX 1; 
(iii) Considers and notes the projected overall expenditure for
projects spanning more than one financial year, as set out in
APPENDIX 2; and 
(iv) Approves amendments to the 2023/24 and 2024/25 capital plan as
detailed in section 6.1 of this report. 
Item 7.
Page 31

Page 32

3. BACKGROUND 
3.1 The capital plan for 2023/24 totalling £59,186,000 was approved by Moray
Council on 1 March 2023 (paragraph 4 of the Minute refers).  Amendments
approved by the Council at its meeting on 8 March 2023 (paragraph 7 of the
Minute refers), and 28 June 2023 (paragraph 8 of the minute refers) have
been incorporated to give a current approved capital plan for 2023/24 totalling
£72,681,000.  The amendments recommended in this report would result in a
capital plan of £64,975,000, but this should not be considered an estimate of
actual spend for the year.  The figure includes expenditure on five Moray
Growth Deal projects as estimated in Outline Business Cases (OBC) – these
projects have not yet submitted Full Business Cases and the OBC estimates
appear unlikely to be achievable in this financial year.  Although budget
managers have expressed confidence that a high proportion of the projects
will spend to current budget there has been a very low spend to date. 
Continued volatile conditions in the construction industry and in supply chains
of materials are causing contractors to decline to tender for works or tender
for prices significantly above estimates, resulting in reduced scope of works
being retendered.  This figure should be treated as the maximum approved
spend in the year.  An estimated spend figure will be developed and reported
as part of the quarter 2 capital monitoring report. 
3.2 As some sizeable projects span more than one financial year, this report
includes a separate APPENDIX 2, giving details of expenditure on such
projects in order to give a complete financial overview of these major projects. 
3.3 The indicative 10 year  capital plan will be reviewed as part of the financial
planning process to reflect the impact of continued construction inflation and
further increased interest rates on the affordability of the plan.  As a short term
savings measure, capital budget managers have also been asked to review
planned expenditure for 2023/24 with a view to delaying projects or otherwise
reducing expenditure in 2023/24. 
4. CAPITAL PLAN 2022/23 
4.1 A copy of the summary capital plan is included as APPENDIX 1 showing
actual expenditure to 30 June of £2,761,000. This is just under 4% of the
currently approved Capital Plan.  General Capital Grant of £2,448,000 has
been received from the Scottish Government. Other grants and contributions
of £32,000 have also been received. In addition to this, Developer
Contributions of £369,000 have been received in quarter 1 of this financial
year and capital receipts of £349,000 for the sale of land & buildings and
vehicles.  The Council previously took advantage of flexibilities allowed by the
Scottish Government that allowed the Council to use capital receipts to fund
spend on Transformation projects. This flexibility ended in 2022/23 and
unused receipts of £4,331,000 were transferred to the Useable Capital
Receipts Reserve and will be use in 2023/24 to fund capital expenditure. 
Page 32

Page 33

4.2 Expenditure on land and buildings to 30 June 2023 totals £591,000. The main
items of expenditure is £135,000 on Council led projects under the Moray
Growth Deal. Expenditure of £304,000 has also been spent on Place Based
Investment, a programme established by the Scottish Government to ensure
that local investment is relevant to local communities for the benefit of local
people. This expenditure is funded by capital grant from the Scottish
Government. 
4.3 Expenditure on infrastructure assets to 30 June 2023 totals £796,000. The
main items of expenditure were £233,000 on Road Safety projects and
£225,000 on various Harbours projects. 
4.4 Expenditure on vehicles, plant and equipment to 30 June 2023 totals
£1,374,000. The main item of expenditure was £1,111,000 on the Vehicle &
Plant Replacement Programme, all of which is slippage from 2022/23 due to
the current lead time for the delivery of vehicles. 
5. PROJECTED OUTTURN AND PROJECT DEFERRALS 
5.1 Budget managers have been recommended to update projected estimates of
expenditure on capital projects in 2023/24.  Projects are graded for
confidence of achieving projected expenditure with high confidence rated as
green, medium confidence as amber and low confidence as red. A summary
of the ratings is given in the table below. 
Risk Status RAG No of
Projects
Projected
Expenditure
2023/24   
£000
High confidence of spend to estimate G 95 32,900
Medium confidence of spend to estimate A 5 9,434
Low confidence of spend to estimate R 12 22,641  
112 64,975 
5.2 The spend projections provided by budget managers are based on the best
information available at this time. 
Red rating
A red status highlights areas where there is low level of confidence in
estimated expenditure. The following have been identified by budget
managers as having a red status:   
Project Capital Plan
2023/24 
£000s
Projected
Expenditure
2023/24
£000s
Land and Buildings  
Refurbishment and Upgrade of Pools 1,900 600
Early Learning & Childcare (ELC) (4 projects) 1,507 359
Replacement Household Waste Recycling
Centre (HWRC)
800 -
Page 33

Page 34

Project Capital Plan
2023/24 
£000s
Projected
Expenditure
2023/24
£000s
Moray Growth Deal (3 projects led by partners) 21,667 21,667
Infrastructure  
Bridges (2 projects) 405 15
Timber Traffic 840 -
TOTAL 27,119 22,641 
5.3 Work on some of the planned Leisure Facilities projects are dependent on the
outcome of the Council’s bid for funding from Phase 3 of the Learning Estate
Investment Programme (LEIP).  It is currently not known what the outcome of
this will be and so there is no certainty on the spend requirements. However,
we may need to undertake a minimal level of works to ensure that the facilities
remain operational in the meantime if urgent requirements were to
materialise.  Various ELC projects have seen issues with the tender process,
both in terms of increased prices and lack of supplier engagement.  Work is
ongoing to ascertain the best way forward on these projects, all of which
arose from Care Inspectorate requirements. 
5.4 Included in the capital plan was £15,000 for works at Blackwater Bridge – this
expenditure is no longer required and no spend will therefore be incurred. The
capital plan approved when the budget was set included £390,000 for works
to Bishopmill Bridge. However, urgent works have been identified at View Hill
Bridge and plans for Bishopmill Bridge will be deferred to allow  this to take
place. There is a risk that, the works at Viewmill could be delayed due to
environmental constraints. 
Amber rating
An amber rating of confidence to spend budget highlights areas where there
are issues impacting on the ability to project spend – generally indicating
factors outwith the budget manager’s control. The following have been
identified by budget managers as having an amber status:  
Project Capital Plan
2023/24 
£000s
Projected
Expenditure
2023/24
£000s
Land & Buildings  
NESS Energy for Waste Plant 5,304 5,304
Infrastructure  
Bridges (2 projects) 1,538 218
Vehicles, Plant & Equipment  
Vehicle & Plant Replacement Programme 5,798 3,678
Children’s Play Area Equipment 234  
TOTAL 12,874 9,434 
5.5 Spend on the Council’s share of the costs of the construction phase of the
NESS Energy for Waste Plant is dependent on the contractors achieiving
agreed milestones which trigger payments and may be subject to change.
This is the last year of constructions with the plant anticipated to be live in the
current financial year. An element of contingency was built into the budget
Page 34

Page 35

and it is not anticipated that this will be required in full.  However, under the
terms of the agreement the primary supplier is permitted to claim for
exceptional costs associated with a delay outwith their control.  The Project
Board, representing the Local Authorities’ interests, is in commercial
negotiations as to the value of this claim. Until these negotiations progress to
a later stage it is not possible to quantify any liability. 
5.6 Expenditure on the planned project at Lea Bridge in Forres is dependent on
the findings of inspections. Spend on the Cloddach Bridge will be dependent
on future Council decisions. At this stage spend on feasibility studies and the
preparation of the Full Business Case is expected. 
5.7 The lead time for vehicle replacements is very long due to issues with the
supply of small components to complete vehicles and there is therefore a high
degree of uncertainty as to when vehicles will be delivered. There is a similar
situation with regards to Play Area Equipment. 
5.8 Details of the projected variances as at June 2023 from the current approved
capital programme, summarised in APPENDIX 1, are set out below: 
Description Ref Underspend/
(Overspend)
£000s
Land and Buildings  
Universal Free School Meals 5.10 98
Refurbishment and Upgrade of Pools 5.11 1,300
Moray Growth Deal  5.12 598
Replacement HWRC 5.13 800
Infrastructure  
Bridges 5.14 2,001
Timber Traffic 5.15 840
Vehicles, Plant & Equipment  
Vehicle Replacement Programme 5.16 2,120
Gull Proof Bins 5.17 (7)
Orchard Road Signals 5.18 (44)
TOTAL  7,706 
Land and Buildings 
5.10 Universal Free School Meals – Capital funding to support the roll out of
universal free school meals to all pupils in P4 and P7.  To date only the roll
out to primary 4 and 5 has been completed.  Current spend is an estimate on
the spend required to purchase additional equipment to support the increased
roll out.  Further work is to be carried out on the required capital investment
required by the end of the financial year and will be updated in future
monitoring reports.  No amendments to the budget are recommended at this
stage. 
5.11 Refurbishment & Upgrade of Swimming Pools – The budget of £1,900,000
was allocated for the upgrade of Buckie Leisure facility.  This has been
delayed while the Council awaits confirmation of its bid for LEIP Phase 3
Page 35

Page 36

funding.  However, we may need to undertake a minimal level of works to
ensure that the facility remains operational, and also potentially on others if
any urgent requirements were to materialise.  At this stage of the financial
year an underspend of £1,300,000 is forecast and it is therefore
recommended to reduce the budget in 2023/24 by this amount.
5.12 Moray Growth Deal 
Bus Revolution – This project has a budget in the current year of £681,000
and is anticipating to underspend by £177,000.  Included within the budget in
the Full Business Case that was approved by the Scottish Government an
element of contingency was included for unforeseen events.  At this stage it is
not anticipated that this will be required. The Council is awaiting delivery of
two vehicles later in the financial year and until these are operational it is not
known if there will be any call on the contingency so no amendments are
recommended at this stage.
Housing Mix Delivery & Cultural Quarter – The budgets for these projects,
which are led by the Council, included in the capital plan are based on the
Outline Business Cases and are currently anticipating an underspend against
the OBC profile of £421,000. The budget will be amended once the Full
Busines Cases have been prepared and approved by the Scottish
Government and no amendments are therefore recommended at this stage. 
5.13 Replacement HWRC  –  This budget was for the land acquisition in relation to
the construction of a Replacement HWRC, which was subject to the award of
a funding application to Zero Waste Scotland. This was unsuccessful and the
project is therefore not proceeding. It is therefore recommended that the full
budget of £800,000 is removed from the capital plan. 
Infrastructure 
5.14 Bridges 
A941 New Craigellachie Bridge – Work is currently ongoing on this project
with the next phase due to start in quarter 2. At this stage it is projected that
there will be an underspend of £274,000 in this financial year. 
A941/100 Blackwater Bridge – No further work is required on this project so it
is recommended that the full budget of £15,000 be removed from the capital
plan. 
A941/340 New Bishopmill Bridge - The capital plan includes £390,000 for
works to Bishopmill Bridge. However, urgent works have been identified at
View Hill Bridge and the plans for Bishopmill Bridge will be deferred to allow
for this to take place within the current year’s capital allocation for bridges. 
Aldunie Bridge Cabrach/Dykeside Bridge – Unbudgeted expenditure of
£2,000 has been incurred in the current financial year relating to minor works
carried over from this project which was carried out in 2022/23.  The project
had a budget of £485,000 and outturned £425,000 in 2022/23 and will still be
under budget after taking this expenditure into account. 
Cloddach Bridge - Spend on the Cloddach Bridge will be dependent on future
Council decisions. At this stage spend on feasibility studies and the
preparation of the Full Business Case is expected. 
Remote Footbridges – This heading is currently forecasting an underspend of
£19,000. It is recommended that this amount is carried forward in full to allow
for work at the Sanquhar Loch Footbridge to be carried out. 
Page 36

Page 37

5.15 Timber Traffic – The Council has been unable to secure funding through the
Strategic Timber Transport Scheme (STTS) in the current financial year and it
is therefore recommended that the full budget of £840,000 be removed from
the capital plan. 
Vehicles, Plant and Equipment 
5.18 Vehicle & Plant Replacement – At the moment the projection for this line,
based on vehicles ordered to date, is to spend £3,378,000, an underspend of
£2,120,000 against the budget of £5,798,000.  However global factors such
as the war in Ukraine, the pandemic and Brexit have caused major
manufacturer factory shutdowns making it difficult to predict delivery times of
vehicles, and therefore the levels of expenditure. It is recommended that the
budget is reduced by the amount of the anticipated underspend of
£2,120,000. 
5.18 Gull Proof Bins – This heading is currently projecting a small overspend of
£7,000 which is due to an increase in the price of bins per unit since the
budget was approved. 
5.19 Orchard Road Signals – Late invoices totalling £44,000 for the installation of
signals equipment were sent by the provider after year end which were not
taken into account in previous reporting.  The overall rise in project costs has
been down to the increase in construction costs experienced between 2020
(when the Project Mandate was completed) and 2023 (when the project was
completed). Additional work was also required to provide new electronically
controlled gates for a property whose access lies within the junction area. 
6. AMENDMENTS TO CAPITAL PLAN 
6.1 The following amendments to the capital plan are proposed:  
Amendments Para  2023/24
£000s
2024/25
£000s
Land & Buildings   
Refurbishment and Upgrade of
Swimming Pools
5.11 (1,300) -
Replacement HWRC 5.13 (800) -
Nature Restoration Fund 6.2 246 -
Town Centre Improvement Plans 6.4 200 -
Infrastructure   
Bridges 5.14/
6.3
(34) 19
Timber Traffic 5.16 (840) -
Grant Funding   
Nature Restoration Fund 6.2 (246) -
TOTAL  (2,774) 19 
6.2 Nature Restoration Fund – The Nature Restoration Fund Scottish
Government funding for actions which help nature recover Funding is included
Page 37

Page 38

in the General Capital Grant.  The Council’s share of the funding is £246,000
and the Council was notifed of this on 29 June 2023. Detailed plans for this
funding will be reported to a future meeting of Economic Development and
Infrastructure Services Committee. 
6.3 View Hill Bridge – View Hill Bridge carries the C26E over a drainage ditch
between Miltonduff and the A96. The Network Criticality of the bridge is
categorised as “Important” because it is on a Priority 1 gritting route. This
bridge was struck by a vehicle on 19 April 2023, causing significant damage
to the western parapet and one on the main supporting beams. The eastern
parapet was damaged when struck by a vehicle in 2018 and this has not yet
been repaired. With damage to both parapets and a supporting beam the
bridge is no longer safe for use by vehicular traffic and has been closed in the
interest of public safety. As this work is judged to be of higher priority than the
work on Bishopmill Bridge, it is recommended that £300,000 is reallocated to
replacement of View Hill Bridge (see paragraph 5.14)  Replacing the bridge
will extend its serviceable life and through widening it will reduce the risk of
accidental damage in the future and the associated repair costs. 
6.4 Town Centre Improvement Plans (Economic Recovery) – Plans under this
heading had seen delays due to insufficient staff resources due to other work
priorities and commitments and in the budget was deferred until 2027/28.
However, plans have been able to be finalised and were reported to Planning
and Regulatory Services Committee at its meeting on 25 October 2022
(paragraph 8 of the meeting refers). It is therefore recommended that the full
amount of £200,000 is brought forward to 2023/24 to allow the planned works
to progress. 
7. RISK 
7.1 Budget managers have been asked to identify any specific areas of risk for
the projects in the capital plan for which they are responsible. 
Generic risks 
7.2 Projects can be subject to risks which are outwith the direct control of the
Council, such as poor weather conditions.  Some assets such as harbours are
particularly vulnerable to bad weather events but there is potential for weather
conditions to impact across all lands and buildings and infrastructure projects. 
7.3 Lack of staff resources and staff turnover can impact on project timescales
and other emerging work priorities can impact in scheduled works and this is
reflected in delays where work planned to be out-sourced is being brought in-
house as a result of poor response to tender requests. 
7.4 There is a risk that time-limited funding is not spent within time-frame and that
the Council therefore loses the opportunity to improve or create assets at no
or reduced cost to the Council. 
7.5 There is a risk that contract inflation might increase the eventual cost of
projects in future years of the capital plan and a risk that any deferment of
Page 38

Page 39

projects relating to asset condition might result in element failure, potentially
incurring unbudgeted costs. The figures in the 10 year plan are based on
current costs and are likely to increase by the time the project is undertaken. 
This consideration will form part of the review of the 10 year plan. 
7.6  A risk to the capital plan in recent years has been an increase in the cost of
materials and scarcity of many materials which are key for the construction
industry. This is partly a world-wide reaction to the pandemic, and partly due
to Brexit, but the war in Ukraine is also having an impact.This is still seen as a
risk but the impact and likelihood is reducing. 
7.7 The cost to the Council of borrowing is based on interest rates at the time.
Continued relatively high levels on inflation are expected to mean that the
current pattern of interest rate rises is likely to continue and this will have an
impact on the cost to the Council and this will underpin the review of the 10
year plan as part of the financial planning process for 2024/25 and beyond. 
Project specific 
7.8 The Climate Change Route Map to Net Zero, setting out how the Council
plans to achieve its target of net zero carbon by 2030, has not been
incorporated into the capital plan.  As projects in the plan are developed
carbon factors will be taken into account.  The impact will be increased costs
for many projects. 
7.9 The main current risk for the vehicle replacement programme is extended
lead in times of up to 24 months due to industry conditions.  There are
pressures on the programme due to targets for local authorities to de-
carbonise their fleets, which also entails developing the infrastructure to
support electric vehicles. 
7.10   The Council’s Learning Estate is generally of a poor condition and this
carries the risk of unplanned work being required to avoid unplanned school
closures.   
7.11 No other project risks have been specifically identified by budget managers. 
There are risks relating to Moray Growth Deal projects which are monitored
by the MGD Programme Board – these will be added to the risks reported on
the Council’s Capital Plan as and when Full Business Cases are approved
and projects led by partners go live. 
8. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Effective budget management is an essential component of delivery of
Council priorities on a sustainable basis. 
The capital plan is one of the vehicles through which the Council’s
priorities can be delivered. The approved capital plan for 2023/24 and
the outline ten year plan incorporates measures designed to address the
Page 39

Page 40

LOIP priorities of building a better future for our children and young
people, empowering and connecting communities and developing a
diverse, inclusive and sustainable economy. 
(b) Policy and Legal
There are no policy or legal implications arising directly from this report. 
(c) Financial implications
The financial implications are highlighted within the report and
Appendices 1 and 2 to the report. 
(d) Risk Implications
Budget managers are aware of their responsibilities for managing
budget allocations and approval for variance will be sought from
Council in line with the financial regulations. Risks specific to items
within the capital plan are highlighted in paragraph 7 of this report 
(e) Staffing Implications
There are no staffing implications arising directly from this report 
(f) Property
There are no property implications arising directly from this report. 
(g) Equalities/Socio Economic Impact
There are no equalities issues arising from this report 
(h)    Climate Change and Biodiversity Impacts
There are no climate change or biodiversity issues arising directly from
this report  Achieving net zero will have significant implications for future
planned capital expenditure 
(h) Consultations
All capital budget managers have been consulted in the development
of estimated actuals as part of the preparation of this report.  Members of
the Asset Management Working Group, all Heads of Service and the
Corporate Management Team have been consulted and any
comments incorporated in the report. 
9. CONCLUSION 
9.1 Capital expenditure in the first quarter of the year amounts to £2,761,000 to
the end of June 2023. 
9.2 Capital expenditure is currently projected to be £7,706,000 lower than the
approved capital plan for 2023/24 but with a high degree of uncertainty due to
current construction industry conditions and other external factors. 
9.3 Amendments to the Capital Plan amounting to a decrease of £1,764,000 in
2023/24 and an increase of £409,000 in 2024/25 are recommended. 
Page 40

Page 41

Author of Report: Laurie Milne, Senior Accountant
Background Papers: 
Ref: LM/LJC/SPMAN-1293228629-915 
Page 41

Page 42

Page 42

Page 43

APPENDIX 1
Moray Council Capital Programme 2023/24
As at 30 June 2023
Capital Plan
2023/24 Actual Q1 Q2 Q3 Q4
Amended
Capital Plan
£000 £000 £000 £000 £000 £000 £000
Land and Buildings
Education, Children's and Leisure Services Committee 10,223 39 39 1,339 2,460 4,988 8,826
Economic Development and Infrastructure Committee 39,279 552 552 3,788 3,839 29,702 37,881
Corporate Committee 1,562 1 1 0 0 1,561 1,562
Infrastructure
Economic Development and Infrastructure Committee 13,651 796 796 3,188 4,712 2,114 10,810
Vehicles Plant and Equipment
Education, Children's and Leisure Services Committee 202 83 83 41 36 42 202
Economic Development and Infrastructure Committee 6,541 1,261 1,261 912 1,039 1,259 4,471
Corporate Committee 1,223 29 29 540 487 167 1,223
72,681 2,761 2,761 9,808 12,573 39,833 64,975
7,706
Funding
Prudential Borrowing 54,506 1,860
General Capital Grant (exc PSHG and CYPA) 8,543 2,092
Other Grants & Contributions 0 106
Developers Contributions 124 138
Moray Growth Deal 9,352
Receipts 156 198
72,681 4,394
Projected Expenditure
Item 7.
Page 43

Page 44

Page 44

Page 45

Major Capital Projects spanning more than 1 financial year (as at 30 June 2023) APPENDIX 2
Description Approved
Total
Budget
Total
Expenditure
in previous
financial
years
Current
Budget
2023-24
Actual
spend
2023-24
Remaining
Budget
2023-24
Project
Life Spend
to 31/03/24
Projected
Future
Years
Budget
Required
Estimated
Final Cost
Projected
Variance
£000 £000 £000 £000 £000 £000 £000 £000 £000
NESS Energy from Waste 27,224 22,092 5,304 0 5,304 21,920 27,224 0
Moray Growth Deal
Bus Revolution 4,000 480 681 39 642 519 2,839 4,000 0
Early Years STEM 4,800 0 200 200 0 4,600 4,800 0
Housing Mix Delivery 7,500 77 1,973 85 1,888 162 5,450 7,500 0
Cultural Quarter 23,802 42 903 11 892 53 22,857 23,802 0
Digital Health 5,000 2,391 2,341 2,341 2,391 268 5,000 0
Business Enterprise Hub 5,268 0 3,915 3,915 0 1,353 5,268 0
Moray Aerospace, Advanced
Technology and Innovation
Campus
27,035 0 17,601 17,601 0 9,434 27,035 0
Manufacturing Innovation Centre 6,832 0 151 151 0 6,681 6,832 0
Total 111,461 25,082 33,069 135 32,934 25,045 53,482 111,461 0
Item 7.
Page 45

Page 46

Page 46

Page 47

REPORT TO: CORPORATE COMMITTEE ON 29 AUGUST 2023 
SUBJECT: PROPOSED SELF-CATERING UNIT TRANSFER POLICY 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To consider the Council’s policy for dealing with self-catering units removed
by the Assessor from the Valuation Roll for non-conformity with the legislative
test. 
1.2  This report is submitted to the committee in terms of Section III (B) (11) of the
local authority's Scheme of Administration relating to the administration of the
levy, collection, payment and recovery of Non-Domestic Rates (NDR). 
2. RECOMMENDATION 
2.1 It is recommended that Committee approve a policy that the Council
does not exercise a discretionary power permitting it to request that in
exceptional circumstances the Assessor retains in the Valuation Roll
any self-catering unit which does not conform to the legislative
requirement of being available for let for 140 days per year and actually
let for 70 days per year. 
3. POLICY DECISION 
3.1 Background 
3.1.1 Properties which are available for let for 140 days per year and are actually let
for 70 days per year are entitled to be classed as self-catering units.  Such a
classification permits them to be inserted on the non-domestic Valuation Roll. 
The resulting liability for the payment of Non-Domestic Rates translates to a
potential entitlement to relief under the Small Business Bonus Scheme. If the
self-catering unit attracts maximum relief, it will pay no local taxes. 
3.1.2 There are currently 520 self-catering units liable for the payment of Non-
Domestic Rates. The majority of these did not pay rates in previous years,
having received Small Business Bonus Scheme relief.
Item 8.
Page 47

Page 48

3.1.3 Although self-catering businesses are a valued piece of the tourism sector, a
proliferation of second homes with limited self-letting (i.e. less than 70 days
per year) places additional unwelcome pressure on the local housing market. 
3.1.4 In 2017 the Barclay Commission published its review of Non-Domestic rating
undertaken for the Scottish Government.  Recommendation no.22 of its report
was “To counter a known avoidance tactic for second homes, owners or
occupiers of self-catering properties must prove an intention to let for 140
days in the year and evidence of actual letting for 70 days.” Scottish
Government accepted the majority of the commission’s recommendations,
including no.22. 
3.1.5 The Scottish Government’s acceptance of this recommendation became law
in The Council Tax (Dwelling and Part Residential Subjects) (Scotland)
Amendment Regulations 2021.  This came into force on 1 April 2022. 
3.1.6 The Assessor is currently reviewing the conformity of self-catering-units in the
financial year 2022-23 to the letting test of being available for let for 140 days
per year and are actually being let for at least 70 days per year.  Any which
fail this test will revert to the Council Tax Valuation List from 1 April 2022,
becoming liable for the payment of Council Tax and losing any entitlement to
Small Business Bonus Scheme relief. 
3.2 Proposal 
3.2.1 There is provision in paragraph 5B of The Council Tax (Dwelling and Part
Residential Subjects) (Scotland) Amendment Regulations 2021 that if there
are “exceptional circumstances” which prevent a property meeting the letting
test, councils may instruct their Assessor to retain it in the Valuation Roll. 
3.2.2 It is proposed that at this time the Moray Council agrees not to exercise the
discretionary power made available to it in paragraph 5B of The Council Tax
(Dwelling and Part Residential Subjects) (Scotland) Amendment Regulations
2021. 
3.2.3 This means in practice that if the Assessor identifies a property as having
failed to conform to the legislative letting test, it will revert to the Council Tax
Valuation List and thereby become liable for the payment of Council Tax in
accordance with its entry on the List. 
3.2.4 There is no immediate advantage to the Council in seeking to go beyond the
requirement that a self-catering unit prove letting as stated in the legislation.
On the contrary, following the same criteria as the Assessor means clarity for
those operating self-catering units. 
3.2.5 If future unforeseen circumstances made the economic environment in Moray
unfavourable to the operation of self-catering units, the policy proposed in
paragraph 3.2.2 would be reviewed and a further report brought to this
committee for consideration. 
Page 48

Page 49

4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP)) 
No council/community planning priority implications for council arise from the
content of this report. 
(b) Policy and Legal 
The discretionary power to instruct the Assessor to retain a property in the
Valuation Roll is contained in The Council Tax (Dwelling and Part Residential
Subjects) (Scotland) Amendment Regulations 2021. 
(c) Financial implications 
The transfer of former self-catering units to the Valuation List where there is
no exemption from the payment of Council Tax comparable to the Small
Business Bonus Scheme will potentially result in increased Council Tax
receipts for the Council.  It is not possible at the time of writing to quantify the
extent any such potential increased income as the number of former self-
catering units which may revert to the Valuation List is unknown. 
(d) Risk Implications 
No risk implications for the Council arise from the content of this report. 
(e) Staffing Implications 
No additional workload for the Taxation Team result from implementation of
the proposed policy. 
(f) Property 
No property implications for the Council arise from the content of this report. 
(g) Equalities/Socio Economic Impact 
No equalities implications for the Council arise from the content of this report. 
(h) Climate Change and Biodiversity Impacts 
No Climate Change and Biodiversity implications for the Council arise from
the content of this report. 
(i) Consultations 
The Depute Chief Executive (Economy, Environment and Finance), the Head
of Economic Growth and Development, the Legal Services Manager, and the
Chief Financial Officer have been consulted in the preparation of this report
and their comments incorporated in its content. 
Page 49

Page 50

5. CONCLUSION 
5.1 It is recommended that the proposed policy is implemented in
accordance with the content of this report. 
Author of Report: James Taylor, Taxation Manager.
Background Papers:
Ref: SPMAN-1293228629-898 
Page 50

Page 51

REPORT TO: CORPORATE COMMITTEE ON 29 AUGUST 2023 
SUBJECT: COMMON GOOD FUNDS – SUMMARY EXPENDITURE FOR
2022/23 AND ESTIMATED DISPOSABLE INCOME FOR 2023/24 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT &
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the final position of Common Good Funds at 31
March 2023 and the estimated income available for disbursement in 2023/24. 
1.2 This report is submitted to Committee in terms of Section III (B) (20) of the
Council's Scheme of Administration relating to dealing with the Management
and Investment of funds including Common Good. 
2. RECOMMENDATION 
2.1 The Committee is asked to: 
i. note the disbursements approved for 2022/23 for each of the
Common Good Funds shown in APPENDIX 1; 
ii. approve the carry forward of the undisbursed balances for
2022/23 for the Buckie, Cullen, Dufftown, Elgin, Forres,
Portknockie, Keith and Findochty Funds to be made available in
2023/24; 
iii. agree the estimated income available for disbursement in 2023/24
shown in APPENDIX 1; 
iv. note the Balance Sheet for each Common Good APPENDIX 2; 
v. note Common Good Fund asset register APPENDIX 3. 
Item 9.
Page 51

Page 52

3. BACKGROUND 
3.1 The origins of Common Good Funds in Scotland are late 15th Century and
they have been defined as “all property of a Royal Burgh not acquired under
statutory powers or held under specified trusts”. 
3.2 Until 1975, the Town Councils or those Burghs in Moray having Common
Good Funds managed them.  Moray District Council took over the
management until 1996 when this Council took over responsibility.  The
Members of the Council are in a similar position to Trustees. 
3.3 The Council must retain the ability to continue to make grants from the
Common Good Funds to future generations.  For that reason preservation of
the Common Good Funds’ Capital is essential. 
3.4 In addition, it is essential to use the revenue generated from the Funds to
maintain the land and buildings held as assets.   
3.5 The Council is obliged to maintain the Common Good Funds’ Balance
whether as land, buildings or cash. Common Good Funds’ cash balances can
be applied to acquire assets or to carry out major repairs but Members must
be satisfied that such acquisitions or works carried out will provide a long term
and lasting benefit to the particular Community as a whole.  The same criteria
have to apply to any disposal of assets.   
3.6 The Policy and Resources Committee on 20 June 2011 established the
Council’s current policy regarding distribution of the annual income available,
(paragraph 7 of the Minute refers).  At that time the Committee noted that the
true value of money depreciates over time and in an attempt to keep pace and
at the same time to be able to make reasonable levels of grants from the
income earned, it agreed a policy of distributing two-thirds of the annual
income earned with the remaining one-third being retained to maintain the
value of the funds. 
3.7 The Policy and Resources Committee agreed on 16 January 2002, to
continue with the policy of distribution of two-thirds of the estimated annual
income available from the Common Good Funds (paragraph 22 of the Minute
refers).  The remaining third was to be re-invested in order to maintain the
funds for future generations. 
3.8 In order to speed up the processing of grant applications, the Policy and
Resources Committee delegated authority to the Head of Financial Services
in consultation with Local Members to consider grant applications and make
appropriate awards. The Moray Council on 13 March 2019 agreed that if two
thirds or more of local members are in agreement it is sufficient authority to
proceed under delegated authority of the Head of Financial Services
(paragraph 10 of the Minute refers). If the agreement of at least two thirds
cannot be obtained on an application then the application will be reported to
Policy and Resources Committee. 
Page 52

Page 53

3.9 The Policy and Resources Committee at its meeting on 2 September 2008
(paragraph 12 of the Minute refers) agreed to allow unspent balances to be
carried forward and be available to use in the following two years.  Any
unused funds after two years are added back to the Fund balance.  At the
same meeting the Committee also agreed that any overspends at the end of
the financial year would be limited to 25% of disposable income in that year
and would be replaced over the following two years. 
3.10 Members should note that the Council is required to account for depreciation
on Common Good assets.  As this is an accounting entry only, the disposable
income continues to be calculated prior to the deduction of depreciation. 
4. 2022/23 DISPOSABLE INCOME AND DISBURSEMENTS APPROVED 
4.1 APPENDIX 1 shows details of the estimated income and actual
disbursements approved for 2022/23 for each of the Common Good Funds. 
4.2 The 2022/23 variance in Elgin Common Good income is as a result of the
tenancy of 239 High Street ending and the lease to a new tenant not starting
until 2023/24. 
5. 2023/24 DISPOSABLE INCOME 
5.1 APPENDIX 1 details the current financial position of the Common Good
Funds and the estimated disposable income for 2023/24.   
5.2 The estimated income figure is calculated to assist Local Members’ decision
making when allocating grants. The figures are only there as a guide.  If a
supported application would breach the estimated income limit, disbursement
can be made but will require Committee approval. 
5.3 As can be seen in APPENDIX 1 there are a number of projects which have
already been approved by Local Members for 2023/24. 
5.4 In the calculation of disbursable income it has been assumed that the full
amount of rental income due in 2023/24 will be received. The disbursable
income for Forres Common Good may require to be adjusted at a later stage,
dependant on the outcome of a rental review. 
5.5 The interest for 2023/24 has been calculated using a two year fixed PWLB
rate of 2.35% as at 1 April 2022.   
6. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))   
None.  
Page 53

Page 54

(b) Policy and Legal 
The Council’s adoption of the policy of retaining one third of disposable
income in each financial year will protect the capital for each of the
Common Good Funds and ensure their sustainability in the future. 
(c) Financial implications 
The financial implications are contained in the body of the report and are
detailed in the Appendices. 
(d) Risk Implications 
There is a risk of overspends exceeding 25% of disposable income if any
unforeseen emergency major repairs are required for properties owned by
Common Good Funds. Close monitoring of costs and the condition of
properties will be undertaken by officers in order to mitigate this risk. 
(e) Staffing Implications 
None 
(f) Property 
The condition of all Common Good properties will be monitored in order
to keep reactive repairs to a minimum. 
(g) Equalities/Socio Economic Impact 
None 
(h) Climate Change and Biodiversity Impacts 
No climate change and biodiversity impacts arise directly from this
report. 
(i) Consultations 
Local Members for each Common Good Fund have been consulted on
disbursements for 2022/23. 
7. CONCLUSION 
7.1 The final outturn for 2022/23 and the budgeted income available for
disbursement in 2023/24 for each of the Common Good Funds, which
the Council administers, is detailed in APPENDIX 1, the Balance Sheet
for each Common Good Fund is shown in APPENDIX 2 and the Common
Good Fund asset register is shown in APPENDIX 3. 
Page 54

Page 55

Author of Report: Nicky Gosling, Accountant
Background Papers: 
Ref: SPMAN-1293228629-902 
Page 55

Page 56

Page 56

Page 57

APPENDIX 1 
Buckie Common Good Fund 
Actual Financial Performance against Estimated Figures for 2022-23 
Estimate Actual Variance  
£ £ £     
Investment Property Income  3,415  2,715  700 
Investment Income  36,962 37,200  (238) 
40,377  39,915  462
Less Administrative Costs  2,667  2,085  582  
37,710  37,830  (120)
Two thirds  25,140   
C/f undisbursed income from prior years  37,214   
Total Budget Available for Disbursement 2022/23  62,354   
Grants Awarded During the Year         
Buckie Victoria Bowling Club  1,000   
Buckie Community Alert Day  860   
Buckie – Moray School Bank  1,500  
Buckie Community Theatre  250  
Buckie Community Theatre  3,000  
Buckie Classic Car Group  25,000  
1st Buckie Guides  500  
Buckie Choral Union  650    
32,760   
Other Expenditure         
Merson Park Pavilion – site clearance  824   
Merson Park Pavilion – drain water systems  947  
Merson Park Pavilion – Electrical Works  980  
NDR - Baron Street Yard and Store  878  
Legal Fees – Sale of March Road West  1,354    
4,983   
Undisbursed Income  24,611   
Item 9.
Page 57

Page 58

Estimated Figures for Disposable Income in 2023/24 
Buckie 
£
Estimated Disposable Income
Undisbursed Income (unused limit carry forward from 2022/23) 
Total Available for Disbursement 2023/24 
Disbursements approved to Date: 
• Buckie & District Seamen’s Memorial Chapel
• Buckies Roots
• Buckie & District Community Council
• The Royal British Legion
• Community Alert Day
26,003    
24,611 
50,614     
1,200
5,000
1,000
4,000
1,000  
Projected Income Available for Disbursement 38,414 
Cullen Common Good Fund 
Actual Financial Performance against Estimated Figures for 2022-23 
Estimate Actual Variance  
£ £ £     
Investment Property Income  -  -  -
Investment Income  4,131  4,131  - 
4,131  4,131  -
Less Administrative Costs  88  41  47  
4,043  4,090  (47)
Two thirds  2,695   
C/f undisbursed income from prior years  -   
Total Budget Available for Disbursement 2022/23  2,695   
Grants Awarded During the Year         
Robert the Bruce Endowment  2   
2        
Undisbursed Income  2,693   
Page 58

Page 59

Cullen Common Good Fund 
Estimated Figures for Disposable Income in 2023/24 
Cullen 
£
Estimated Disposable Income
Undisbursed Income (unused limit carry forward from 2022/23) 
Total Available for Disbursement 2023/24 
Annual Recurring Requests Outstanding:- 
• Robert the Bruce Endowment
(This amount is £2.10 accrued annually until sum reaches a
reasonable amount to be paid out)
• Cullen and Deskford Community Council 
2,790  
2,693   
5,483 
2
350
Projected Income Available for Disbursement 5,131 
Dufftown Common Good Fund 
Actual Financial Performance against Estimated Figures for 2022-23 
Estimate Actual Variance  
£ £ £     
Investment Property Income  -  -  - 
Investment Income  353  353  - 
Other Income  8  8  - 
361  361  - 
Less Administrative Costs  3  4  (1)  
358  357  1 
Two thirds  239   
C/f undisbursed income from prior years  349   
Total Budget Available for Disbursement 2022/23  588   
Grants Awarded During the Year  -   
Undisbursed Income  588    Page 59

Page 60

Estimated Figures for Disposable Income in 2023/24 
Dufftown 
£
Estimated Disposable Income 244
Undisbursed Income (unused limit carry forward from 2022/23) 
Total Available for Disbursement 2023/24 
415   
659
Projected Income Available for Disbursement 659 
Elgin Common Good Fund 
Actual Financial Performance against Estimated Figures for 2022-23 
Estimate Actual Variance  
£ £ £     
Investment Property Income  33,361  22,868  10,492
Investment Income  37,654  37,391  264
Other Income  -  555  (555)  
71,015  60,814  10,201
Less Administrative Costs  2,389  2,836  (447)  
68,626  57,978  10,648
Two thirds  45,751   
C/f undisbursed income from prior years  58,818   
Less previously agreed expenditure for property
repairs  (4,394)  
Total Budget Available for Disbursement 2022/23  100,175   
Actual Grants Awarded         
Bishopmill Mutual Imp Association  15,000  
Moray School Bank  10,000  
Rotary Club Fireworks 2022  2,500   
27,500   
Other Expenditure         
Contribution to Seagull Control 2022-23  13,234   
Scotland Loves Local Contribution  5,000  
Oakwood Fence Repairs  257  
Ebid - 239 High St, Elgin  58  
239 High St – Secure Letterbox  66  
239 High St – Repair Lock  70  
239 High St – drain system  314   Page 60

Page 61

General Insurance 239 High St, Elgin  76   
19,075   
Undisbursed Income   53,600   
Estimated Figures for Disposable Income in 2023/24 
Elgin 
£
Estimated Disposable Income 44,966
Undisbursed Income (unused limit carry forward from 2022/23)
Less repayment of capital advance for property repairs 
Total Available for Disbursement 2023/24 
Disbursements approved to Date: 
• Anderson’s Care Home
• Anderson’s Care Home
• New Elgin & Ashgrove Public Hall
• Rotary Club of Elgin Bonfire 2023
• Sonic Seagull Deterrent (balance of payment)
• Ladyhill Grass Cutting (increase to weekly cuts)
• Repairs to 239 High Street 
53,600   
(4,397) 
94,169 
7,500
6,000
8,000
5,000
10,250
600
32,500
Projected Income Available for Disbursement 24,319 
Forres Common Good Fund 
Actual Financial Performance against Estimated Figures for 2022-23 
Estimate Actual Variance  
£ £ £     
Investment Property Income  31,655  30,683  972 
Investment Income  10,872  11,037  (165)
Other Income  -  200 (200)  
42,527 41,920  607
Less Administrative Costs  1,993  2,631  (638) 
40,534  39,289  1,245
Two thirds  27,022   
C/f undisbursed income from prior years  8,356   
Less previously agreed expenditure for property repairs  (1,485)       
Total Budget Available for Disbursement 2022/23  33,893   
Page 61

Page 62

Grants Awarded During the Year         
Forres Christmas Lights Insurance  600   
Forres Heritage Trust Ltd  2,000   
Transition Town Rental Grant  8,200  
Moray School Bank  8,000  
Leanchoil Trust  10,300  
Forres – Friends of Woods & Fields  250   
Forres Rotary Bonfire 2022  1,624   
30,974   
Other Expenditure         
-  
-        
Undisbursed Income  2,919   
Estimated Figures for Disposable Income in 2023/24 
Forres 
£
Estimated Disposable Income 19,392
Undisbursed Income (unused limit carry forward from 2022/23) 
Total Available for Disbursement 2023/24 
Disbursements approved to Date: 
• Forres Mechanics
• Forres in Bloom 2023
• Forres Theme Day 2023
• Forres Area Community Trust
• Forres Community Council
• Forres Christmas Lights 2023
• Forres Heritage Trust Ltd
• Ewan Watson 
2,919   
22,311 
12,500
5,000
1,000
1,000
500
600
400
500  
Projected Income Available for Disbursement 811 
Page 62

Page 63

Portknockie Common Good Fund 
Actual Financial Performance against Estimated Figures for 2022-23 
Estimate Actual Variance  
£ £ £     
Investment Income  1,237  1,222 15 
1,237  1,222  15 
Less Administrative Costs  61  62  (1)  
1,176  1,160  16
Two thirds  784   
C/f undisbursed income from prior years  835   
Total Budget Available for Disbursement 2022/23  1,619   
Grants Awarded During the Year         
Portknockie Paddling Pool  500   
North of Scotland Gloster Club  300   
800   
Undisbursed Income  819   
Estimated Figures for Disposable Income in 2023/24 
Portknockie 
£
Estimated Disposable Income 789
Undisbursed Income (unused limit carry forward from 2022/23) 
Total Available for Disbursement 2023/24 
Disbursements approved to Date:
819 
1,608 
-
Projected Income Available for Disbursement 1,608 
Page 63

Page 64

Keith Common Good Fund 
Actual Financial Performance against Estimated Figures for 2022-23 
Estimate Actual Variance  
£ £ £     
Investment Income  286  286  - 
Other Income  - - -  
286  286  - 
Less Administrative Costs  2  645  (643) 
284  (359)  643
Two thirds  189   
C/f undisbursed income from prior years  49   
Total Budget Available for Disbursement 2022/23  238   
Grants Awarded During the Year  -   
Undisbursed Income  238   
Estimated Figures for Disposable Income in 2023/24 
Keith 
£
Estimated Disposable Income
Undisbursed Income (unused limit carry forward from 2022/23)
183                 
238   
Total Available for Disbursement 2023/24  421
Projected Income Available for Disbursement 421 
Page 64

Page 65

Findochty Common Good Fund 
Actual Financial Performance against Estimated Figures for 2022-23 
Estimate Actual Variance  
£ £ £     
Investment Property Income  1,500  1,500  - 
Investment Income  83  110  (27)  
1,583  1,610  (27)
Less Administrative Costs  76  126  (50)  
1,507  1,484  23
Two thirds  1,004   
C/f undisbursed income from prior years  1,099   
Total Budget Available for Disbursement 2022/23  2,103   
Grants Awarded During the Year         
Findochty Town Hall  600    
600   
Other Expenditure   -   
Undisbursed Income  1,503   
Estimated Figures for Disposable Income in 2023/24 
Findochty 
£
Estimated Disposable Income 985
Undisbursed Income (unused limit carry forward from 2022/23) 
Total Available for Disbursement 2023/24 
1,503 
2,488 
Projected Income Available for Disbursement 2,488 
Page 65

Page 66

Page 66

Page 67

Appendix 2
Balance Sheet as at 31st March 2023 by Common Good Fund
Buckie Cullen Dufftown Elgin Forres Portknockie Keith Lossie Findochty Total
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
Fixed Assets 3,435 17 - 11,632 1,982 - 346 1,882 - 19,294
Current Assets
Debtors and Stocks 1 - - 8 - - - - - 9
Loans Fund Balance 1,633 180 15 1,613 471 53 12 - 5 3,982
1,634 180 15 1,621 471 53 12 - 5 3,991
Current Liabillities
Creditors - - - 2 3 - - - 1 6
- - - 2 3 - - - 1 6
Total Net Assets 5,069 197 15 13,251 2,450 53 358 1,882 4 23,279
Financed By:
Revaluation Reserve 3,390 17 - 10,301 1,067 - 56 1,882 - 16,713
Revenue Balance 1,679 180 15 2,950 1,383 53 302 - 4 6,566
Reserves 5,069 197 15 13,251 2,450 53 358 1,882 4 23,279
Item 9.
Page 67

Page 68

Page 68

Page 69

APPENDIX 3
Buckie Common Good
** Fishermans Hall, 16 North Pringle St, Buckie
Town House West (Hall), Cluny Place, Buckie AB56 1HB
Library, Cluny Place, Buckie, AB56 1HB
Fishing Heritage Centre, Cluny Place, Buckie AB56 1HB
Town House West (Offices), Cluny Place, Buckie AB56 1HB
Public Toilets, Cluny Place, Buckie
Sites Opposite 26 Barron St, Buckie AB56 1XD
42A Freuchny Rd, Buckie AB56 1TX
25B East Cathcart St, Buckie AB56 1JP
Site to rear of 5 Bridge Place, Buckie
Store, Freuchny Road, Buckie
Linzee Gordon Park, Buckie - Public Park, Play Area and Pavilion
* Cricket Club Linzee Gordon Park, Buckie
* Pavilion And Football Ground,  Merson Park,  Barhill Road,  Buckie
* Merson Park - Public Park and Play Area
Buckie Victoria Bowling Club, West Church Street, Buckie
Heritable Assets - Ansons Collection
Heritable Assets - Chains of Office
Cullen Common Good
Heritable Assets - Chains of Office
Dufftown Common Good
Tininver Park, Tininver Street, Dufftown
Woodland Princess Royal Park Conval Street Dufftown
Woodland Bridge Of Poolinch Dufftown
Woodland Tininver Brae Dufftown
Woodland Mortlach Distillery Dufftown
Elgin Common Good
239 High Street, Elgin, IV30 1DJ
Site Adjacent To 239  High Street  Elgin  Moray 
Riverside Caravan site, Elgin IV30 8UN
Field Adjacent to The Oaks, Morriston Road, Elgin
Field Adjacent to Oakview, Morriston Road, Elgin
Shooting Acres & Aughteen Park Lands, Pluscarden Road, Elgin
Moray Leisure Centre, Borough Briggs Road IV30 1AP
Field at Riverside, West Road, Elgin
Ground adjacent to The Mansion House, Blackfriars Rd, Elgin
The Oaks, Morriston Road, Elgin IV30 6UN
Playing field, Borough Briggs Rd, Elgin
Lesser Borough Briggs, Borough Briggs Road, Elgin
Play area, McIntosh Drive, Elgin
Play area, Ardgilzean Place, Elgin
Loch and Country Park, Millbuies, Elgin
Depot Cooper Park, Elgin
Greenfingers Nursery, King Street , Elgin IV30 1HU
Biblical Gardens, King Street, Elgin
Training Centre, Cooper Park, King Street, Elgin
Rainbow Castle, Borough Briggs Road, Elgin
Dovecot Pavilion, Elgin
Monument, Prospect Terrace, Lossiemouth (Charter of Novodamus)
Site opposite 2 Seatown, Lossiemouth (Charter of Novodamus)
Public Convenience, Seatown Rd, Lossiemouth IV31 6JL (Charter of Novodamus)
Heritable Assets - Chains of Office
Common Good Asset Register Item 9.
Page 69

Page 70

Forres Common Good
Forres Mechanics Football Ground, Mosset Park, Lea Rd, Forres IV36 1AU
Forres Bowling Club, St Catherines Rd , Forres
Nelsons Tower
The Greens, Forres
Car Park, Bogton Road, Forres IV36 3TW
Nursery, Bogton Road, Forres IV36 3TW
Bogton Playing Field and Play Area, Bogton, Forres
Christies Elite Nurseries Limited, Bogton Rd, Forres IV36 3TW
38a Clovenside Road (adjacent to Clovenside Cemetry), Forres
Field, Pilmuir Road West, Forres
Kingsmeadow Field, Forres
Field A Clovenside
Field B Clovenside
Market Cross Monument, High St, Forres
Forres Golf Course, Forres IV36 2RD
Land at mouth of River Findhorn
Roysvale Park and Pavillion, Sanquhar Road, Forres
Heritable Assets - Chains of Office
Keith Common Good
Nursery Park, Keith
Show Ground Store, Seafield Park, Keith AB55 5AJ
Pavillion, Seafield Park, Keith
Seafield Park, Keith
Heritable Assets - Chains of Office
Lossiemouth Common Good
Coulardbank Pavillion, Coulardbank Playing Fields, Lossie
Coulardbank Playing Fields, Coulardbank Road, Lossiemouth
* 1st Lossiemouth Scout Hall, Elgin Road, Lossiemouth IV31 6HD
Town Hall,  High Street,  Lossiemouth   IV31 6AA
Lossiemouth Library,  High Street,  Lossiemouth   IV31 6AA
Heritable Assets - Chains of Office
Findochty Common Good
Burghead Common Good
St Aethans Park and Play Area, St Aethans Rd, Burghead
Heritable Assets - Chains of Office
Assets transferred from Moray Council in 2022-23
* Cricket Club Linzee Gordon Park, Buckie
* Merson Park - Public Park and Play Area
* Pavilion And Football Ground,  Merson Park,  Barhill Road,  Buckie
* 1st Lossiemouth Scout Hall, Elgin Road, Lossiemouth IV31 6HD
Assets transferred to Moray Council in 2022-23
Land adjacent to Mosset Park,Lea Road, Forres, IV36 1DX
Assets removed in 2022-23
Sold 2022/23 Development Land, March Road West, Buckie
CAT Transfer 2022/23 Town Hall, 22 Station Rd, Findochty AB56 4PN
** The Community Asset Transfer of Fisherman's Hall, Buckie has now been completed and the asset will be removed in 2023-24
Page 70

Page 71

REPORT TO: CORPORATE COMMITTEE ON 29 AUGUST 2023 
SUBJECT: PROCUREMENT ANNUAL REPORT FOR 2022/23 AND
PROCUREMENT STRATEGY FOR 2023/2026 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To provide the Committee with an update report on Procurement activity in
Moray and in particular on procurement performance for 2022/2023 and to
seek Committee approval of the Strategy for 2023/26 and the Procurement
Action Plan for 2023/24. 
1.2 This report is submitted to Committee in terms of Section III B (21) of the
Council's Scheme of Administration relating to procurement arrangements. 
2. RECOMMENDATION 
2.1      It is recommended that the Committee: 
i. considers and notes the overall procurement performance for
2022/23 set out in the Annual Report in APPENDIX 1 and
summarised in Section 4 below; 
ii. approves extending the current one year Strategy to three years
(2023 to 2026) outlined in Section 3.3 below; and 
iii. approves the Strategy and Procurement Action plan set out in
APPENDICES 2 and 3 and summarised in Section 5 below. 
3. BACKGROUND 
3.1 The Procurement Reform (Scotland) Act 2014 (the Reform Act) introduced a
number of significant duties for all public bodies, including the publication of a
Procurement Strategy and subsequent Annual Procurement Report, which
outlines performance against that Strategy. 
3.2 The Procurement Strategy for 2021/22 was approved by the Economic
Growth, Housing and Environmental Sustainability Committee on 8 June 2021
Item 10.
Page 71

Page 72

(paragraph 12 of the minute refers).  No changes to this strategy were
recommended for 2022/23. 
3.3 Given the maturity and stability of the Procurement horizon and the fact that
little change was made to the strategy last year, it is recommended that the
review timetable for the strategy is amended from one to three years.  A draft 
Procurement Strategy for 2023 to 2026 is included as APPENDIX 2 to this
report along with the Procurement Action plan for 2023/24 as APPENDIX 3. 
The Procurement action plan will be subject to annual review and will continue
to be reported to future meetings of this Committee along with the Annual
Procurement Report. 
4. 2022/2023 PROCUREMENT PERFORMANCE 
4.1 The report assesses performance against a number of categories including: 
i) Summary of Regulated procurements;
ii) Review of procurement compliance;
iii) Assessment of progress against the action plan; and
iv) Non Cash benefits. 
4.2 The main learning points from the 2022/23 report are: 
i) There continues to be a significant increase in workload for the team
with the post pandemic catch up, additional ring fenced monies
received by the Council and activity that did not form part of the annual
Departmental Procurement planning process (DPAP) across most
Council services. 
ii) The market conditions around increased prices, supplier / contractor
capacity and uncertain supply chains have impacted on some tender
results with a number receiving either no interest or higher than
anticipated pricing. 
iii) As a result of this procurement activity the savings for categories 1 and
2 (non-budget adjusted and budget adjusted) shows a slight decrease
from all time high last year £2.038 million to £1.638 million (see
paragraph 4.3). 
iv) Work continues with the wide ranging non cash benefits derived from
procurement activity including collaboration, environmental impacts and
community wealth building considerations.   
4.3   The Section 4 (table 4) of the annual report – Moray Update - includes the
following summary of procurement savings recorded during 2022/23: 
Page 72

Page 73

Cash Savings   
Category of
Saving
1Recurring savings 
£ million
Savings for year (adjusted for start
and end date)
£ million 
2022/23 2021/22 2022/23 2021/22
1 Budget not
adjusted
0.688  1.022 0.627 0.792
2 Budget
adjusted
0.951 1.016 0.935 0.973
Total 1.638  2.038 1.562 1.766
6 Capital N/A 3.470  3.470 0.516
7 Rebate N/A 0.067  0.067 0.034 
4.4  The Council has maintained a savings target of £1M for a number of years in
the expectation that it would become harder to achieve savings from recurring
contractual award.  Whilst is disappointing that the 2021/22 level of savings
was not maintained it is not unexpected given the inflationary market
conditions. 
4.5 The total contract savings (estimated award values) achieved through
procurement since the centralised operation was created in 2011 is £18.4M 
5. STRATEGY 2023/26 AND PROCUREMENT ACTION PLAN 2023/24 
5.1 A new Strategy has been developed for 2023/26 to reflect the work done to
date and the changing workload and priorities of the team and is included as
APPENDIX 2 to this report.   
5.2 The changes to the Strategy are in tracked changes, with the exception of
data.  Data in the previously approved Procurement Strategy was for 2019/20
and has been updated to 2022/23 in APPENDIX 2, but not in tracked
changes, for ease of reading. 
5.3 A new Procurement Action plan has been developed for 2023/24 to reflect the
work done to date and the changing workload and priorities of the team and is
included as APPENDIX 3 to this report.   
5.4 Key points in the Procurement Action Plan are summarised below: 
• Development of the contract register;
• Continuation of work to support the Supplier Development Programme
and Community Wealth Building actions; and
• Continuing to work to further embed climate change considerations into
the procurement process. 
1 Recurring annual savings from the lifespan of live contracts
Page 73

Page 74

6. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The work undertaken by the procurement team assists the Council
achieve its local outcomes detailed for the Council’s priorities in the
Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan) 
(b) Policy and Legal
The Council’s procurement  policy, which sets the overall aims for
procurement, was agreed by the Policy Committee on 29 August 2007
(paragraph 11 of minute refers). This policy will be reviewed during
2023/24 and reported to the Corporate Committee.   
(c) Financial implications
Details of savings are shown in paragraph 4.3 of this report. The
procurement savings make a significant contribution to the Council’s
ability to balance its budget. 
(d) Risk Implications
If the Council fail to implement the annual Procurement Strategy this
may impact on its ability to achieve additional savings and procurement
benefits in the future. 
(e) Staffing Implications
Increased workloads are impacting on the ability of the procurement
team to respond to additional requests from departments and in future
the service will require to prioritise such requests. 
(f) Property
There are no property issues arising directly from this report. 
(g) Equalities/Socio Economic Impact
Equality impact assessments were carried out on the procurement
process in August 2016 with no significant changes since then. 
(h) Climate Change and Biodiversity Impacts
The following positive climate change implications have been identified
from the work being carried out by the procurement team: 
• All Procurement officers have been through the corporate Climate
Change training programme which helps them to identify potential
tenders for specific climate consideration
• Weighted questions have been developed to challenge potential
suppliers on their climate change impact 
(i) Consultations
Information contained in Departmental Procurement Action Plans
(DPAP), agreed with Heads of Service has been used to create the
future regulation procurement summary.  Efficiency savings are
calculated in consultation with the Accountancy section and agreed by
the Chief Financial Officer.  Heads of Services, Principal Climate Change
Page 74

Page 75

Officer and Committee Services have been consulted in the preparation
of this report and comments included. 
7. CONCLUSION 
7.1 The Annual Procurement Report summarises procurement progress
during 2022/2023.  This shows areas of progress and good performance
and also identifies areas for further improvement with actions for
continuing improvements in the Council’s procurement arrangements
contained in the Procurement Action Plan. 
7.2 The three year Strategy outlines how the Council will meet legislative
requirements for procurement and continue to support the local
economy 
Author of Report: Diane Beattie, Payments Manager – Ext 3136 
Background Papers: 
Ref:   SPMAN-1293228629-928 
Page 75

Page 76

Page 76

Page 77

APPENDIX 1 
Right Rationale
Right Route
Right Result
Right Reward
Right Research
MORAY COUNCIL 
ANNUAL PROCUREMENT REPORT
2022/2023
Item 10.
Page 77

Page 78

2
INDEX 
PAGE
SECTION 1 Summary of Regulated Procurements     4
SECTION 2 Review of Regulated Procurement compliance     5
SECTION 3 Future Regulated Procurement Summary 2019 to 2021   9
SECTION 4 Moray Update         9
SECTION 5 Summary                   11 
TABLE 1 Summary of live contracts by category     4
TABLE 2 Approach to single supplier       5
TABLE 3 Non cash benefits         6
TABLE 4 Summary of non-cash benefits      7
TABLE 5  Supported business summary       8
TABLE 6 Procurement Savings         10
TABLE 7  Breakdown of Procurement Activity      11
CHART 1 Breakdown of Procurement Activity      12 
SECTION 6
PART 1 Action Plan results PCIP Measures                 13
PART 2 Action Plan results  Procurement Measures     16
SECTION 7 Scottish Government Annual Report Statistics               20
Page 78

Page 79

3
INTRODUCTION 
The Procurement Reform (Scotland) Act 2014 (the Act) requires the Council to publish its
Procurement Strategy each year and, in order to report compliance with this Strategy and the
Act itself, the Council must publish an Annual report. 
In addition to the required information set out in the Act, this report also includes
performance against a number of indicators which were introduced by the Council in order
to measure progress on the duties introduced by the legislation. 
In order to evidence our progress against our targets, the published Annual Report requires
some form of measurement.  The statistics presented in this report provide the evidence
which should, over time, show how the Council is progressing against both the national and
local objectives.  The following sections provide both the statistical information and a
commentary on performance (in italics). 
The procurement team has seen an unprecedented increase in workload in the past 2 years
and with the added complications of an ever changing market this is affecting outputs.  The
reasons behind the increase are many:
Post pandemic catch up
New statutory duties
Ring Fenced Funding (at short notice)
Moray Growth Deal 
Large programmes of work – construction efficiency works, educational resource programme,
smarter working, etc 
The increase in workload is also being felt in departments with less time available for Lead
Officers to devote to procurement activity.  The procurement activity programme and the
individual procurement officer workload is reviewed continuously and, where possible,
actions taken to try and streamline processes and allow for more productive outcomes. 
Working with Departments we are looking at longer term planning to avoid annual
procurement activity, more sustainable category C (local) contracts to replace reliance on
national frameworks, reviewing contract administration to streamline process and a general
call for early procurement involvement in capital programmes. 
Page 79

Page 80

4 
SECTION 1 – SUMMARY OF REGULATED PROCUREMENTS 1 
TABLE 1 highlights the summary of the number and value of live contracts 2022/23
(2021/22) by contract category.   
TABLE 1
Contract Type Number 
2022/23
Number 
2021/22
Estimated
Contract
Annual
Value
2022/23
£000s
Estimated
Contract Annual
Value 
2021/22 
£000
Category A (national) 30 25 7,847 4,715
Category B  (sectoral) 152 129 34,121 31,030
Category C (local single
supplier)
172 195 45,347 47,271
Category C (framework) 10 14 4,396 10,957
Category C1 (local
collaboration)
15 15 3,041 1,771
Category O (other) 108 91 9,172 12,464
Non advertised  102 115 11,581 14,045
2022/2023 Total 589 584 115,503 122,252
Quick Quotes and Mini
competitions
74 62 1,504 1,000 
Number Value
2021/2022 Total 584 122,252 
2020/2021 Total 516 130,499
2019/20 Total  599 133,651
2018/19 Total 522  168,614  
2017/18 Total  476 142,891 
2022/23 New entries to register
In total there are 589 live contracts listed in the Council’s contract register; of these:
189 (£23,317,005) contracts and 40 (994,122) Quick Quotes were awarded or added to the
register in the year 2022/23. 
Commentary on performance: 
We have seen a year on year increase in contractual volume since 2017/18 (with the exception
of the pandemic years), however the total contract value is reducing, highlighting the increase
in procurement activity that is not reflected in spend cover.  There is also an increase in Quick
Page 80

Page 81

5
Quote and Mini competition activity much of this is due to the success of the Council’s Small
Works Framework which had 40 mini competitions in 2022/23. 
In addition to the formal procurement process Departments can make approaches to single
suppliers to meet urgent or specialist need.  This process is subject to review by the
procurement team and approval by the Chief Financial Officer.  Numbers of single supplier
approaches increased during 2022/23 which reflects the difficulty departments have in
resourcing procurements in a timely manner, resorting to emergency single supplier
approaches. 
TABLE 2
2019/2020 2020/2021 2021/2022 2022/2023
22 24 55 66 
In addition to the increase in awarded contracts the team continue to see an increase in
projects started but not completed due to market conditions and supplier capacity.   
SECTION 2 – REVIEW OF REGULATED PROCUREMENT COMPLIANCE 
The Council’s procurement procedures requires corporate support for all regulated
procurements (tenders over £50,000 - as defined by procurement legislation) and the
corporate team also review any Quick Quotes  (projects under £50,000) before publication. 
This scrutiny delivers a high level of compliance to all regulation, both statutory and Council
approved procedures.  All procurements have an individual strategy development stage
which considers the requirements, the options, the potential for added value and the
inclusion of any wider opportunities.  This includes a focus on mandatory exclusions, serious
and organised crime links, supplier development opportunities, Fair work first, climate
change, non-cash benefits and innovation. 
Performance 
SECTION 6 provides the performance results against the Council’s Procurement Action Plan
for 2022/2023, which is split between the Procurement Commercial Improvement
Programme (PCIP) objectives and the Procurement Strategy measures.   
Commentary on performance: 
SECTION 6 PART 1 – PCIP Objectives
Page 81

Page 82

6
Progress has been made on all bar one of the eleven actions in Section 1 of the Procurement
Action plan for 2022/23 with 7 complete, 1 removed (prepare for PCIP) and 1 which is still
work in progress (support for Moray Integration Joint Board (MIJB)).  The procurement team
are working to support projects that have been identified by the service as priority i.e.
workload, climate and CWB. 
SECTION 6 PART 2 – Procurement Measures 
This section of the Procurement action plan concentrates on measurements that will support
and evidence the delivery of the Procurement Strategy. 
This includes:
Savings (more details can be found in Section 4 of this report – page 10)
Collaboration – an increase in the use of collaborative contracts
Contract Benefits – an increase in the number of contracts that have at least one contract
benefit which shows that the vast majority of our contracts now have a benefit of some kind
Planned/Unplanned Workload – although the percentage of unplanned work (ie not
contained in the DPAP) has reduced the actual number has increased which reflects the overall
increase in workload
Purchase Order Compliance – a result that has been around the 75% for some years reflecting
the exclusion of stock orders from this calculation 
Business with Small & Medium Enterprise - an increase in the number and value of spend but
a decrease in the percentage 
Local Business – using the wider context of “local, we measure the spend between Aberdeen
City and Shire, Moray and Highland borders – a measure that fluctuates between years but
remains constantly in the 50%+ bracket.  This year shows a slight reduction from 2021/22.
Events – members of the procurement team have attended 18 supplier and training events.
That is a major achievement given the effort required to prepare and deliver these sessions
Sustainable Duty – given the nature of the low value contracts awarded by the Council we do
record a low level of performance but we can see some improvement and with the introduction
of the proposed Community Identified Benefits Site we should see an increase in the future
with more low value benefits being delivered. 
Non cash benefits 
The Council considers a wide range of non-cash benefits when developing a tender
specification: the range is wider than just the social, environmental or economic factors (also
referred to as community benefits) that is required by the Act and incorporates added value
benefits such as process efficiencies and price stability.    The Act only requires community
benefits inclusion in tenders with a value of over £4 million, however Moray considers
inclusion wherever possible in all supported tenders (over £50,000). 
Page 82

Page 83

7
Table 3 provides a high level view of the non-cash benefits that have been included in the
contracts awarded in the year. 
TABLE 3 
Commentary on performance: 
The Council’s method of recording non-cash benefits was introduced in 2015/2016 and we
have seen a year on year improvement (discounting the impact of the pandemic): 
TABLE 4
2017/18 182
2018/19 220
2019/20 330
2020/21 203
2021/22 315
Benefit Category No of
contracts
Sub category
Collaboration/tender process 157 143 savings in procurement development
time 
14 digital process
Cost Avoidance 16 3 added value
6 price increase rejection
6 price versus market savings
1 cost removal
Purchase to Pay Process 7 4 e- invoicing
3 consolidated invoices
Demand/Rationalisation 12 9 specific contract issues
3 rebates
Community 35 4 apprentices
15 Community Benefit Clause (wide ranging)
7 school visits
9 training
Environmental 26 7 energy
11 greenhouse gases
3 sustainable construction
5 waste
Social  12 3 fair work issues
7 other – wide ranging
2 Participatory budget
Living Wage (Fair Work First) 107 25 Accredited
5 Working to accreditation
67 Paying living wage
1 commitment to pay
9 Neither paying or accredited
Page 83

Page 84

8
2022/23 372 
Non-cash benefits are recorded for all contracts, this may result in some duplication where a
framework allows for mini competitions as both will have non-cash benefits recorded on the
contract register. 
As the maturity of our procurement portfolio grows it has made it more difficult to achieve
financial savings and so we are starting to see a switch in focus to the non-cash added value
benefits although on a small scale due to the lower value range of contracts we have. The
emerging focus on climate issues and community wealth building should also provide the
impetus for future delivery of non-cash benefits.  Increases in both these areas have been
achieved:
Environmental from 22 (2021/22) to 26 (2022/23)
Community from 20 (2021/22) to 35 (2022/23)
It is also worthy of note that following the work done by the procurement team to secure the
Council’s Living Wage Accreditation in September 2022, our influence in this area continues
with 98 positive responses to the Fair Work First non-cash benefit. 
Work is required on the contract register to allow for more detailed recording of these contract
impacts.  At present the data is held at contract level but we really need to drill down to
supplier level for some of these categories – for example Living wage.  This links to action 1.2
on the Procurement Action Plan. 
Supported Businesses 
Table 5 considers the potential use of supported businesses.  Public organisations can reserve
the right to participate in procurement for the award of a public contract/framework to a
supported business (explanation below). 
Supported businesses are organisations the main aim of which is the social and integration of
disabled or disadvantaged persons and where at least 30% of those employed and engaged
with the programme are disabled or disadvantaged. 
TABLE 5
Reserved Supplier 2022/23
Turnover
£
*2021/22
Turnover
£
Group 1  
Scotland Bravest Manufacturing Company 352 431
Group 2  
Moray Reach Out 367,245 347,015
Out of Darkness Theatre 114,235 110,129
Page 84

Page 85

9
Living Ambitions 432,381 885,153 
Commentary on performance: 
The second group of suppliers in the above table are not formally contracted as supported
businesses but we believe that our use of these companies goes some way to meet the Reform
Act requirement to support such enterprises.  These companies however cannot meet the
“employment” criteria but certainly do meet the “engagement” element. 
SECTION 3 - FUTURE REGULATED PROCUREMENT SUMMARY 
The Procurement team work with Heads of Service to develop a Departmental Procurement
Action Plan (DPAP) for their service that identifies the Council’s procurement activity for the
coming year.  In addition to this internal forward planning the Act requires the publication of
a summary of future regulated procurements in the next two years.   
The plan for Moray Council from April 2023 to March 2025 totals: 
Number of contracts expiring 341
Estimated value of expiring contracts £289,740,215
Estimated annual value £61,420,592 
The detail of this forward plan can be found in our published contract register which
includes all contracts information - Contract Register - Moray Council 
Commentary on forward plan: 
The above statistics are taken from the contract register.  This list contains all contracts with
an end date between April 2023 and March 2025; however it should be noted that some may
be subject to possible extensions and some may not be re-let.  Decisions around the direction
for each requirement are taken during the annual DPAP planning process with Service Heads. 
To expand on this forward plan (which only takes account of expiring contracts from the
Council’s contract register), an annual planning exercise is undertaken with Service Heads to
take account of other projects which will involve procurement.  This results in our Procurement
Activity Forward Plan - Procurement Activity Forward Plan - Moray Council    This informs the
market of our intentions including capital but cannot guarantee that all projects listed will
result in a competitive tender.  It also directs attention to those projects that may benefit from
climate change and community wealth building focus.
Page 85

Page 86

10 
SECTION 4 - MORAY UPDATE 
The pandemic, Brexit, inflation and the Ukraine conflict continues to produce uncertainty in
the supply chain and increased demand on certain markets.   There is also an increase in
market uncertainty and reduced supplier availability.  Although we have concerns about
recent market engagement with some tenders receiving little if any response to our published
tenders and quick quotes, we are continuing to support departments to maximise their
procurement potential.   
Moray Council Procurement Savings – The Council has a process for recording the impact of
contracts on the council – this includes cash and non-cash benefits. The cash savings have
been categorised as follows: 
1 Cash saving anticipated – but budget not adjusted
2 Cash saving anticipated – budget adjusted
3 No baseline – savings cannot be established, review of contract on anniversary of
award to reassess
4 No savings anticipated 
With Local authority finances becoming increasingly more complicated, the expanded list   of
savings categories allows for the measurement the outcomes from any procurement exercise. 
5 Non cash benefits
6 Capital – projects delivering savings against estimate/budget, total saving taken
in the year the project was awarded 
7 Rebate – centralised collection of contract rebates 
Table 6 provides the results for 2022/23 and the previous year (comparison).   
TABLE 6
Cash Savings   
Category of
Saving
1Recurring savings 
£ million
Savings for year (adjusted for start and
end date)
£ million 
2022/23 2021/22 2022/23 2021/22
1 Budget not
adjusted
0.688  1.022 0.627 0.792 
1 Recurring annual savings from the lifespan of live contracts
Page 86

Page 87

11
2 Budget
adjusted
0.951 1.016 0.935 0.973
Total 1.638  2.038 1.562 1.766
6 Capital N/A 3.470  3.470 0.516
7 Rebate N/A 0.067  0.067 0.034 
Commentary on savings achieved:
As expected the results for 2022/23 are down on the all-time high we recorded last year -
from just over £2M to £1.6M.  This is a reduction back to the level recorded in 2017/18 and is
to be expected given the maturity of the contract base.  As we re-let contracts it becomes
much harder to deliver on cash savings particularly in the current inflationary market. 
It should be noted that these savings are calculated using the estimated values at point of
contract award.  The values are only amended for any annual increases applied to long term
service contracts, if the team are made aware of such changes. 
Maintaining the value for category 2 budget adjusted makes the most difference to the
council’s budget.  However it should be noted that any category of saving achieved from the
procurement process means that the contract starts from a much healthier position and even
if increases are imposed they start at a lower level. Given the challenges outlined above it is
encouraging that savings continue to be made at a significant level. 
Procurement Commercial Improvement Programme (PCIP) – a national evidence based audit
for all public organisations, which considers a wide-ranging set of competencies.  Normally
carried out every two years the programme has been suspended due to COVID-19.  Moray
Council’s last assessment was in March 2018, this resulted in a score of 64%, which took us
from Level 2 to Level 3 (silver) but left us short of the national Local Authority average of 70%. 
Moray Council is not alone with concerns around procurement resources and to gauge
availability for the relaunched PCIP in 2023/24, public bodies were asked if they wished to
seek exemption.  We have asked for exemption as resources are currently needed to be able
to concentrate on service delivery. 
Supplier engagement – The Council continues to work with Supplier Development
Programme (SDP).  The team supported all of the national and local meet the virtual buyer
events including Meet the Buyer North which was held in Elgin in September 2022.   
In addition to the SDP events the procurement team have held a number of contract specific
events during 2022/23:
• Food Event to promote the Fresh Meat Contract and to talk to Fruit & Veg suppliers
• “Trades” events to promote the Repair and Maintenance Contract 
Page 87

Page 88

12 
In addition to the specific contract events the team have also attended:
Meet the Buyer National
Meet the Buyer North 
Scotland Excel Annual Conference 
SECTION 5 - SUMMARY 
With the overall staff turnover that the Council has seen recently the number of departmental
officers trained in the Councils procurement process has declined and this has resulted in an
increase in the level of support that many require to complete a tender.   Added to the
increase in procurement activity this has resulted a significant increase in workload for the
team.  At the end of 2022/23 our team activity programme recorded a total of 490 projects,
147 still work in progress and 343 completed, breakdown provided in Table 7. 
TABLE 7
Letters of Variation 10%
Direct Award from Framework  36%
Mini Competition from Framework  14%
Quick Quotes 23%
Tender 14% 
Chart 1 
The higher percentage of Direct Awards from Frameworks is mainly attributed to the success
of Moray Council’s Small Works Framework, which makes up a quarter of all Direct Awards
completed in 2022/23. 
Page 88

Page 89

13 
An analysis of the completed work does highlight however a significant number of projects
(68) that were no longer needed, pulled or deferred for various reasons, including
submissions that were over budget.   For it has been a particularly difficult year for the team
with uncertain market conditions and increasing focus on procurement to deliver on the
climate change and community wealth building strategies. 
APPENDIX 2 Page 20 - is the Annual report template for the statistics requested by the
Scottish Government.  A number of the measurements are not currently recorded as they
would involve a significant change to our process which is already burdensome and heavily
reliant on human intervention.   
Page 89

Page 90

14
SECTION 6 
MORAY COUNCIL PROCUREMENT ACTION PLAN  2022/2023
PART 1 -  PCIP Measurements
Data Warehouse
Action Timetable Aim  Result
1.1 
To develop existing contract
register to   maximise on required
functionality          ICT dependent 
March 2023
Carried forward from 2021/22 
Functionality requests submitted to ICT to
improve access to data and ease of use
To meet Statutory and Council requirements 
Detailed specification with ICT
1.2 
Living Wage – Capture of Living
wage information and
understanding of Supplier position. 
Sept 2022  To gain Living Wage accreditation
COMPLETE
Contract register review undertaken
Relevant suppliers contacted
Milestones created
Application approved September 2022
1.3 
Preparation for the next Scottish
Government’s Procurement and
Commercial Improvement
Programme (PCIP) 
Date to be
determined
by SXL 
Identify key areas and service / staff to
prepare and undertake the next PCIP
assessment 
REMOVE
Awaiting revised Programme content and
timetable
Revised programme consultation (Feb 23)
Exemption proposal consultation (Feb 23)
Exemption option chosen (Mar 23)
No PCIP in 2024
Page 90

Page 91

15
1.4 
Review Departmental Procurement
Action Plan (DPAP) structure –
additional DPAP for Moray Growth
Deal and Capital Projects 
December
2022 
Improved engagement with Services and
more information obtained for planned work
to populate the Procurement Activity Plan
(PAP) 
COMPLETE
DPAP exercise completed (Apr 23)
To include a revised DPAP process for ICS and
H&SCM care services
DPAP produced for  MGD and the Capital Plan
Forward Plans published 
Leadership & Governance 
1.5 
Health &Social Care (MIJB) Support  Ongoing 
Targeted support to develop infrastructure for
MIJB
Maintain contract timeline for monitoring
purposes. 
Establish DPAP process or similar to manage
Planned Work. 
WORK IN PROGRESS
New DPAP exercise started
DPAP process interrupted by emergency plan (Jan
23) 
Increased commitment to support (Jan to Mar 23) 
Timeline updated monthly
Emergency plan developed in response to External
Audit report on commissioning
Procurement team supporting the priorities
identified by service 
Support is also being provided to the service to
help develop new procedures and documentation
1.6 
Supplier Development Programme
(SDP) and Community Wealth
Building (CWB) 
March 2023 
Throughout
the year 
To continue to support Economic
Development with the membership of SDP
through the Moray Supplier Development
Forum (CWB)
To support the development of a local
Community identified benefits system and
embed into relevant procurement projects
To meet community wealth building
expectations 
COMPLETE
Support continues with attendance at the CWB
session in December 22
Community Wish List approved – work underway
to develop web page
No meetings of the Supplier Development Forum
since ??
A number of local Meet the Buyer events held
(covering 4 procurement opportunities)
Development & Tender 
1.7 
March 2023 
COMPLETE
Page 91

Page 92

16
Review workload allocation process
and PO time management  Throughout
the year
To manage the team workload to ensure
council priorities are met
Review of establishment pending reduction in fte
at the end of March
Temporary resource made permanent 
Review of workload carried out to establish
trigger points and actions taken to try to alleviate
the impact of these 
1.8 
Review sustainability questions to
include new focus on Climate
Change 
March 2023 
Throughout
the year 
To embed climate change issues into the
procurement process 
COMPLETE
Procurement staff have attended the climate
change training 
New standard statements on PCS under review
1.9
To support and deliver
requirements identified in the
Climate Change Action Plan 
March 2023 
Throughout
the year 
To meet climate change action plan
expectations 
COMPLETE
Climate Change original actions concentrated on
introducing new tasks/processes which are now
complete.  A review of actions has been carried
and a new set of actions identified which are
focussed on longer term progress (to be included
in the Climate change  Action Plan
1.10 
Collection of Living Wage status   
March 2023 
Throughout
the year 
Linked to 1.1 and 1.2 - Capture of Living Wage
status and understanding supplier position to
maintain Living Wage accreditation at tender
award stage 
COMPLETE
Standard questions in place for use during tender
exercises
Contract 
1.11 
Post award implementation
improvements: 
Checklist/structure/pack for
meeting 
Throughout
the year 
Carried forward from 2021/22 
To ensure that contract awards are subject to
a full implementation plan with all
stakeholders involvement as part of the
operational improvement programme
COMPLETE
Team challenged to consider what added
value/savings can be made by improving contract
use.
Development sessions to review process held and
actions assigned
Key Purchasing Processes 
Page 92

Page 93

17
PART 2 
Procurement Measurements
2022/2023
Measure Target 2022/23 2021/22 Will demonstrate
Comments
a. Savings    
A1 Percentage of all council expenditure covered
by contracted suppliers
Total commercial spend – contract register annual
estimated values for live contracts in year
95% 90.73% (95.26%)  The measurement takes account of spend with
contracted suppliers 
A2 Value of procurement savings achieved
through contracts live during the year
£1M £1.638M  (£2.038M) The financial results from contracts 
A3 Number of collaborative contracts awarded as
a percentage of all commenced in year
40% 55.03%  (34.08%)  Successful collaboration
A5 Percentage of contracts commenced in year
that contain a contract benefit (all categories)
15% 96.83% (84.92%) Increasing focus on non-financial benefits 
a. Contracts    
B2 Percentage of unplanned/ activity during the
year 
25% 61.42%  (67.01%) Measure to try and keep unplanned to a minimum 
Percentage affected by overall increase in workload
200 2018/19, 342 2019/20, 412 2020/21,476 2021/22,
490 2022/23
b. Compliance    
C3 Percentage of Account Payable transactions
with a Purchase Order (where relevant ie non-
recurring) number during year
75% 74.79%  73.71%) Compliance management 
Page 93

Page 94

18
Measure Target 2022/23 2021/22 Will Demonstrate
Comments
c. Accessibility     
D1 Percentage of  contracts commenced during
year to SMEs
30% 21.69%  (24.02%) SME access to our business – volume 
Excluding call offs from Frameworks
Increase in number but decrease in % due to the
increasing workload
D2 Percentage value of annual spend with SMEs
for year
55% 53.61%  (50.90%)  SME access to our business – by value
D3 Percentage value of spend with Moray,
Highland and Aberdeen council areas
50% 42.98% 47.97%) local” access to our business – value 
Spend staying in the North of Scotland
D4 Number of “events” held or participated in
during year
10 18 6 Supplier engagement (8) and internal training sessions
(10)
d. Community Benefits     
E1 Percentage of commenced contracts within
the year that have a community benefit (category
7)
20% 11.11% 7.82% Sustainable duty performance
Hard to include community benefits in the contracts 
we award (low value)
E2 Percentage of collaborative contracts
commenced in the year that have a community
benefit (category 7)
20% 10.05% 5.03% Sustainable duty performance 
As for E1
e. Sustainability     
F1 Percentage of contracts commenced in the
year that have incorporated a sustainable target
(category 5)
20% 9.52% 8.94% Sustainable duty performance 
Very few of our locally developed contracts are suitable
for a sustainable target (cat 5 environmental).  However
with the new focus on climate change issues and the
potential for a wider range of potential areas to target this
is improving. 
F2 Score on Scottish Government Flexible
Framework on Sustainability
Level 3 Level 3 Level 3 Sustainable duty performance 
Page 94

Page 95

19
SECTION 7
Scottish Government Annual Procurement Report template 
[NOTE: reference to contract is also to be construed as meaning a framework agreement] 
1. Organisation and report details            
a) Contracting Authority Name         Moray Council  
b) Period of the annual procurement report         2022/2023»  
c) Required by s18 Procurement Reform (Scotland) Act 2014 to prepare an annual procurement report? (Yes / No) Yes                
2. Summary of Regulated Procurements Completed            
a) Total number of regulated contracts awarded within the report period   189  
b) Total value of regulated contracts awarded within the report period   £37,947,241  
c) Total number of unique suppliers awarded a place on a regulated contract awarded during the period 429      
i)  how many of these unique suppliers are SMEs         236      
ii) how many of these unique suppliers are Third sector bodies   Not recorded                
3. Review of Regulated Procurements Compliance            
a) Number of regulated contracts awarded within the period that complied with your Procurement Strategy 189  
b) Number of regulated contracts awarded within the period that did not comply with your Procurement Strategy 66   
4. Community Benefit Requirements Summary            
Use of Community Benefit Requirements in Procurement:            
a) Total Number of regulated contracts awarded with a value of £4 million or greater. 0  
b) Total Number of regulated contracts awarded with a value of £4 million or greater that contain Community  0      
Benefit Requirements.  
c) Total Number of regulated contracts awarded with a value of less than £4 million that contain Community  21      
Benefit Requirements     
Page 95

Page 96

20     
Key Contract Information on community benefit requirements imposed as part of a regulated procurement that were
fulfilled during the period:    
d) Number of Jobs Filled by Priority Groups (Each contracting authority sets its own priority groups) Not recorded  
e) Number of Apprenticeships Filled by Priority Groups         Not recorded  
f) Number of Work Placements for Priority Groups         Not recorded  
g) Number of Qualifications Achieved Through Training by Priority Groups Not recorded  
h) Total Value of contracts sub-contracted to SMEs         Not recorded  
i) Total Value of contracts sub-contracted to Social Enterprises         Not recorded  
j) Total Value of contracts sub-contracted to Supported Businesses         Not recorded  
k) Other community benefit(s) fulfilled         Not recorded                
5. Fair Work and the real Living Wage            
a) Number of regulated contracts awarded during the period that included a Fair Work First criterion.          110         
b) Number of unique suppliers who have committed to pay the real Living Wage in the delivery of a regulated  97      
contract awarded during the period.  
c) Number of unique suppliers who are accredited Living Wage employers and were awarded a regulated 25      
contract during the period.                
6. Payment performance            
a) Number of valid invoices received during the reporting period.         70073  
b) Percentage of invoices paid on time during the period (“On time” means within the time period set out in  92.12%      
the contract terms.)  
c) Number of regulated contracts awarded during the period containing a contract term requiring the prompt  189      
payment of invoices in public contract supply chains.  
d) Number of concerns raised by sub-contractors about the timely payment of invoices within the supply chain  NIL      
of public contracts.  
Page 96

Page 97

21               
7. Supported Businesses Summary            
a) Total number of regulated contracts awarded to supported businesses during the period   1  
b) Total spend with supported businesses during the period covered by the report, including: £351      
i)  spend within the reporting year on regulated contracts          0.00      
ii) spend within the reporting year on non-regulated contracts    £351   
8. Spend and Savings Summary            
a) Total procurement spend for the period covered by the annual procurement report. £115,165,914  
b) Total procurement spend with SMEs during the period covered by the annual procurement report. £68,538,220  
c) Total procurement spend with third sector bodies during the period covered by the report. Not recorded  
d) Percentage of total procurement spend through collaborative contracts.   Not recorded                
e) Total delivered cash savings for the period covered by the annual procurement report £935,463   
f) Total non-cash savings value for the period covered by the annual procurement report Not recorded                
9. Future regulated procurements            
a) Total number of regulated procurements expected to commence in the next two financial years  341  
b) Total estimated value of regulated procurements expected to commence in the next two financial years £289,740,215   
Page 97

Page 98

Page 98

Page 99

1 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
Right Rationale
Right Route
Right Result
Right Reward
Right Research
MORAY COUNCIL
PROCUREMENT STRATEGY
2023/2026
APPENDIX 2
Item 10.
Page 99

Page 100

2 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
Contents 
Introduction     3 
Procurement for Moray   4 
Vision Statement 5 
Strategy Rationale      6 
Procurement Spend and Savings 8 
Procurement Objectives      12 
Moray Council Process 20 
Procurement Measurement    30 
Glossary          31 
Page 100

Page 101

3 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
Introduction 
This strategy outlines our priorities for the period 2023 to 2026. 
Building on the high level Scottish Government Public Procurement Strategy for Scotland (2023 to 2028), (insert link) the Moray Council Strategy
provides the local level detail to support the ambitions contained within that plan. 
At a Council level we aim to deliver a high quality professional procurement service that achieves value for money across all services and contributes to
the achievement of our corporate priorities, whilst taking account of  our duties as required in the Procurement Reform (Scotland) Act 2014. 
The strategy recognises that the procurement of goods, works and services has a major impact on many aspects of life in Moray, including the environment,
social factors and local economic development.  The Council recognizes the important impact public sector procurement can have for local businesses and
aims to maximize benefits for local communities, giving Value for Moray. 
The strategy gives a clear direction and approach to deliver improvement to our procurement process over the next three years and will be supported by
an annual review of procurement targets and actions designed to ensure that the procurement process meets the needs of the Council and local
communities, now and in the future. 
It is important to recognise however that this strategy does not, of itself, lead to effective procurement. The commitment of senior management,
elected members and lead officers throughout the council are all important to its success. 
As the Chair of the Committee with responsibility for procurement, I recognise that this strategic approach to the subject can achieve significant benefits
for the Council, the local people, local services, local businesses and the local environment.  As the Moray economy continues to recover from the
impact of the pandemic it will place a strong emphasis on Community Wealth Building, using our procurement spend to add value to the local economy. 
Page 101

Page 102

4 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
Chair of Corporate Committee 
Page 102

Page 103

5 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
Value for
Money
Procurement for Moray 
Procurement is the total process of acquisition and disposal, starting from
the identification of a requirement. It therefore includes pre-contract
activities (options appraisal and sourcing) and post contract activities
(contract management and supplier relationship management). 
The Council is mindful that the impact of procurement is far greater
than this definition of a ‘process’ and our vision, objectives and
principles as set out in this strategy illustrate the contribution that
effective procurement arrangements can make to wide ranging socio-
economic agendas. These include equality and diversity, a successful
local economy, a thriving voluntary and third sector, environmental
issues (including the Council’s commitment to Climate Change) and
value for money and for Moray. 
The Procurement Strategy is built on the successes delivered under the
previous strategies by continuing the development of an effective
centralised procurement operation. 
The Procurement team provide early engagement in service development
and continue with support throughout the life of a contract. This can
add a strategic element to the process and as a consequence lead to
more wide ranging commercial excellence and ‘Value for Money’
rather than just procurement success 
Scottish Procurement
Model
Page 103

Page 104

6 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
Vision Statement for Moray Council Procurement 
To embed commercial excellence throughout the organisation, ensuring that our services always deliver Best Value for
Moray through the consistent application of this strategy, embedding community benefit and climate focus in our procurement
processes to deliver the corporate priorities of Our People, Our Place and Our Future, supporting an economy based on well-being and
inclusion 
Page 104

Page 105

7 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
Strategy Rationale 
To support the Council in achieving its overall aims, details of which can be found in the Corporate Plan 2024, which outlines Moray Council’s
contribution to the priorities in Local Outcomes Improvement Plan (LOIP). This strategy has been developed to focus on how procurement will deliver
our externally provided services. 
It is clear from the challenges highlighted in our long term plans that delivering first class, innovative services for Moray will not be easy. Every contract
opportunity will have to be explored to ensure that all aspects of the requirement are considered before tendering, the request clearly sets our
requirement; the resultant submissions are evaluated according to our priorities, adopted in the most efficient manner and monitored throughout the
delivery of the contract. 
It is therefore essential that the content of this strategy forms the basis of every procurement, with all stakeholders committed to delivering its direction. 
Current Moray Council limits determine the direction of any procurement: 
Under £5,000 – best price
£5,001 to £50,000 – Quick Quote (QQ) 
£50,001 + – regulated tender 
£50,001 to £2,000,000 – following supplier selection process, a quotation process for certain construction projects. 
Page 105

Page 106

8 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
Procurement Spend and Savings 
Moray Council procurement spend is measured in a number of ways, using the systems and data to best present an accurate picture. 
The following uses the latest set of complete data (2022/23) to provide context for this Strategy and shows how much we spend by contract category and
by department along with data on both cash and non-cash savings. 
Contract Register Values 
At the point of contract award an impact statement is prepared for each project highlighting the values associated with that contract. This data is used to
populate the contract register and calculate the following values for contracts live during the relevant year: 
2022/23 Estimated Contract Annual Value and Number by contract category 
Category A – National £7.8M  30
Category B – Sectoral  £34.1M 152
Category C – Local  £61.4M 284
Category C1 – Collaborative  £3M 15
Category O – Other Organisations  £9.2M 108
Regulated Total 115.4M 589 
In addition to the register entries for all contracts that have been awarded via the competitive tendering process wealso record all sub-
regulated value contracts that are awarded by the Quick Quote (QQ) process (individual contracts each with a total estimated value of less
Page 106

Page 107

9 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
than £50,000 across the life of the contract). 
Non regulated - QQ 1.51M  74
Total including QQ £117M 663            
The figures above are based on the estimated annual value for the Council’s live contracts during 2022/23. However, in order to determine the true overall
picture we have to analyse the spend information available from the Council’s financial management systems. This shows us the actual relevant spend was
£127M for the year with £1M non- commercial (ie. refunds, grants, etc.) £115M spend was with contracted suppliers leaving a total of £12M with non-
contracted suppliers.  Spend with non-contracted suppliers is regularly reviewed to identify areas where the Council would benefit from having a contract
in place ie potentially recurring expenditure as opposed to expenditure which is likely to be one-off. 
Given the seasonal nature of and varying annual spend on some of our commodities it is hard to be totally accurate when estimating total contract spend
over the life of the contract. 
Savings 
As well as recording the contract values the impact statement for each contract also identifies the anticipated savings categorised as follows: 
1 Anticipated cash saving
Budget not adjusted
Savings insignificant 
Budget too diverse 
Budget not identified
2 Anticipated cash saving
Budget Adjusted
Budget adjusted in line with Impact statement 
3 No baseline – savings cannot be established Data not available at commodity level
Baseline is historic (infrequent purchase)
Contract will be reviewed (annual anniversary) with
contracted supplier to establish savings
4 No Savings anticipated Contract has resulted in no savings or indeed an increase
Page 107

Page 108

10 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
5 Non Cash  Non cash benefits
6 Capital (new for 2017) Capital projects delivering savings against estimated budget at contract
award
7 Rebate (new for 2018) Centralised collection of rebates 
The Council had set a procurement savings target of £1M for 2022/23 and reported the following savings for that year: 
2022/23 Cash Savings – 1.639M 
1 – Unadjusted Budget
2 = Adjusted Budget 
Contract Category Savings Type 1  Savings Type 2 
Category A - National £0.042M £0.132M
Category B - Sectoral £0.016M £0.012M
Category C - Local £0.621M £0.801M
Category O – Other organisation    £0.006M £0.000M
Quick Quotes                                   £0.002M £0.006M
Total    £0.688M £0.951M
In addition to the above cash savings the Council recorded a capital saving
Capital  Savings Type 6 £3.470M £0.516M 
Non-cash benefit data is categorised into 8 main headings (listed below) with 28 more detailed sub headings. 
Page 108

Page 109

11 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
2022/23 Non cash Contract Benefits  
Cost Avoidance 16 
Collaboration/Process  157 (All national and sectoral (Category A and B) contracts fall into this category) – see p23 below)
Rationalisation 12 
P2P Process  7 
Environmental 26 
Social   12 
Community   35 
Living Wage   107 
Total 372 
Page 109

Page 110

12 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
Procurement Objectives 
The following key objectives have been developed to ensure that Moray Council achieves Best Value whilst also delivering on our procurement duties and
responsibilities under the Procurement Reform (Scotland) Act 2014. 
a.  Savings – considering the potential savings a contract may deliver. Moray Council has developed a Procurement Savings Strategy to be applied to each
project.  A review of the Savings Strategy (written in 2016) is to be carried out in 2023/24 to see if it is still relevant. 
b.  Contracts – managing the forthcoming procurement activity is key to ensuring early engagement and influence by
the procurement team.  A new process for ensuring capital spend is incorporated at an early stage is being considered. 
c.  Compliance – ensuring that all procurement activity complies with statutory and regulatory requirements both national and local. 
d.  Accessibility – ensuring that contracts can be structured in such a way as to allow access to Council business, wherever practical, to local
suppliers, micro, small and medium enterprises and the third sector.   Building on the  Community  Wealth  Building  Strategy     introduced  by  the  Council   in
2023, relevant procurement  activities  will  consider the potential local impact of the contract and service delivery  as part of the tender
development. 
e.  Community Benefits – ensuring that all relevant contracts have considered the inclusion of community benefits that will, in particular, benefit the local
Moray community.  Aspects of Community Wealth Building sit within the ambit of community benefits   
f.   Sustainability – ensuring that all relevant contracts are arranged to include sustainable procurement requirements and contribute towards the Council’s
targets for climate change as detailed in the Climate Change Strategy and Route Map to Net Zero.. 
Measurements have been developed to collect outcomes for these objectives and will be incorporated into the Moray Council Procurement Action Plan
2023/24 
Page 110

Page 111

13 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
a.   Savings 
Purpose
To achieve the targeted savings. 
Activities
Various methods will be employed to maximise both cash and non-cash benefits from our contracts: 
•   Applying the Procurement Savings Strategy to all relevant projects leading to early identification of potential savings. 
•   Ensuring effective contract management to manage these contracts, ensuring delivery of identified benefits and any other potential added value
opportunities that may arise during the lifetime of the contract. 
•   Increasing use of collaborative contracts with other public sector organisations, thereby effectively sharing and where possible leading on, national
and regional benefits 
•   Developing and implementing more efficient ordering and invoice processing methods 
Main Measure 
• Savings achieved 
Page 111

Page 112

14 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
b.   Contracts 
Purpose
To ensure that all contract activity for the coming year is allocated, project managed and effectively delivered within expected timeframe by
the Procurement team. All key contracts and suppliers are effectively managed by Departmental Lead officers and supported by the
Procurement team throughout the lifetime of each contract. 
Activities
Collaborative and forward planning between the Procurement team and Moray Council Departments is key to the getting the right resource at
the right time: 
•   Annual Departmental Action Plan process - The Procurement team engage with Service Heads and Lead Officers to produce their service
procurement annual plan, including local, sectoral and national contract activity  A new mini DPAP process is being considered for capital
projects 
•   Service procurement plans are merged to produce the annual Moray Procurement Activity Programme 
•   Resources are allocated on a quarterly basis to meet the planned activity 
•   Weekly monitoring of Procurement team activity ensures that all projects are progressing, escalating those that are not 
•   All contracts are supported by the development of a Procurement Strategy document, a complete record of the decisions and direction taken
during the lifetime of the requirement 
Main Measure 
• Percentage of unplanned activity taken to award in the year 
Page 112

Page 113

15 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
c.    Compliance 
Purpose
For Moray Council to make the most of our procurements and to avoid challenge and unfair practices, we must ensure compliance with national and local
regulation. 
Activities
Managing expectations from a tender exercise will minimise the risk of poor outcomes and potential legal challenge: 
• All regulated contracts receive procurement team support to ensure compliance to legislation and council regulation 
•   Procurement team peer review of each project to ensure compliance 
•   Procurement team review of quote submissions prior to publication 
•   Review of Accounts Payable transactions over £5,000 to ensure compliance with procedures.  This includes contract background, (which may result in
approach to single supplier), Purchasing process (purchase order present), payment in advance and emergency actions 
•    
•   Moray Council has for some time mandated the use of publiccontractscotland (PCS) portal for advertising our opportunities but also uses the linked
electronic tendering system publiccontractscotland – tender (PCST) for all appropriate tenders 
Main Measure 
• Percentage of Accounts Payable transactions with a Purchase Order number during year. 
Page 113

Page 114

16 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
d.    Accessibility 
Purpose
To make sure that Moray Council opportunities are accessible by all 
Activities
A number of actions are undertaken at various stages of a procurement to ensure that we reach as wide an audience as possible: 
•   Early engagement between Department and Procurement team to allow time for market issues to be considered 
•   Good market research 
•   Stakeholder engagement 
•   Sub-contractor and supply chain considerations making use of PCS 
•   Maintaining links with local and national forums, Scotland Excel (SXL), Business Gateway, TSI Moray, Public Contracts Scotland (PCS) 
• Work with the Supplier Development Programme (SDP) 
• Work with the Council’s Economic Development service and the Supplier Development Forum to engage with local suppliers and develop their ability to
tender for council opportunities.  This includes a seat on the SDP Regional Group. 
•   Hold and participate wherever possible in procurement events, promoting access to Moray Council contracts, 
Main Measure
Page 114

Page 115

17 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
• Percentages of contract numbers and values with Small to Medium sized Enterprises during year 
e.      Community Benefits 
Purpose
To maximise our use of community benefits for all contracts – although our legislative duties relating to Community Benefits only applies to contracts
over £4M, Moray Council will consider the development and inclusion of such clauses in all our contracts taking into consideration the value and
commodity in question. 
Activities
•   Ensure that the procurement process considers what the Council wants from the procurement and how community benefits can support the
objectives providing added value to the commercial process 
•   Maintain a local focus on the potential benefits arising from any such contract clauses 
•   Support Scotland Excel in the development of Local Authority (category B) contracts, ensuring the same level of local consideration is included
(where possible) 
•   Report annually on performance based on Moray Council categorisation of benefits 
• Challenge contractors to highlight their Fair Work First practices (including their stance on the Living wage) in tender responses 
• Challenge contractors to outline their approach to climate change issues in tender responses 
• Consider innovation and potential added value developments during tender development and the lifetime of the resultant contract 
Main Measure
Page 115

Page 116

18 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
• Number  of contracts commenced during the year which have a non cash benefit by category 
f.       Sustainability 
Purpose
To deliver sustainable outcomes from each contract that support the Council’s overall sustainable targets in the
Corporate Plan and to widen this approach to at least consider the impact a contract may have no matter how small. 
The Procurement Reform (Scotland) Act 2014  formalised work which had previously been undertaken to develop the wider ranging benefits that
can come from a structured procurement project and introduced a set of sustainable procurement duties that public organisations have to
incorporate into their process. 
Activities
•   Procurement team to challenge each project to consider sustainability issues at stage one of the development of the requirement 
•   Performance reported annually based on Moray Council categorisation of benefits 
•   The Council will use the Scottish Government Flexible Framework tool to measure our progress against organisational procurement
strategies and help build an action plan for future developments in this area 
•   Make use of the Scottish Government prioritisation tool to establish the sustainable priorities for each Council service 
• Complete the actions identified in the Climate Change Strategy attributable to procurement activities – see below 
Climate Change - Although linked to the Councils commitment to sustainability and the Procurement Reform (Scotland) Act 2014 duties for Economic,
Social and Environmental issues, the focus on Climate Change received additional emphasis with the declaration of Climate and Ecological Emergency by
the Council in June 2019.  This set a goal of being carbon neutral by 2030.  To achieve this goal the Council has developed a Climate Change Strategy
http://www.moray.gov.uk/downloads/file136442.pdf  which outlines the actions required by officers and members.  This includes a number of specific
Page 116

Page 117

19 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
actions for procurement but also sets the wider challenge to effect the required culture change in everything we do to ensure that climate change is at the
forefront of our intentions, including the development of specifications for external goods and services. 
Main Measure
• Percentage of contracts commenced during the year which have a sustainable target. 
Page 117

Page 118

20 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
Moray Councillors
CorporateCommittee
Financial Regulation
Annual Strategy & Target/Annual Report
Audit and Scrutiny Committee
Corporate Management Team /
Chief Financial Officer
Annual Procurement Improvement
Plan
Procurement Procedures 
Payments Manager
Annual Strategy
Review
Internal Auditor
Annual Audit Plan
Procurement Team
Procurement Support
Audit Team
Audit Reports 
Moray Process 
Procurement Structure 
The Council has adopted a centralised procurement operation. The key element to that operation is the Departmental Commodity Lead Officer, the
business expert who leads on all procurement projects for that commodity and who is supported by the procurement team. 
In order to ensure a consistent approach to procurement across the Council, a standard procurement process has been developed which all officers are
required to follow. This is incorporated into our Financial Regulations and Procurement Procedures which provide a step by step guide on the main
components of the procurement process. Procurement procedures must be followed by all officers without exception. 
The Procedures are reviewed and updated annually to take account of national and local regulatory changes and initiatives. 
Ultimately the Chief Executive is responsible for all procurement carried out within the Council. However governance and accountability for procurement
has been delegated: 
Governance 
•   Moray Councillors will provide the strategic leadership required to ensure that Officers execute their
procurement duties effectively, efficiently and economically and that they also promote and establish
Page 118

Page 119

21 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
Moray Councillors
Procurement Policy &
Strategy
Corporate Management
Team/Chief Financial Officer 
Corporate Procurement
Progress
Payments Manager
Corporate procurement progress
Procurement Annual report
Heads of Service
Departmental Procurement Progress
(DPAP)
Budget Managers
Managers Contract
Authorisation
Lead Officers
Contract Management 
Authorised
Procurers/Procurement
Officers
Tender strategy and process
constructive supplier and stakeholder relationships in order to deliver best value and quality services to the
community and to deliver Best Value for Moray. 
•   The Procurement Team will support departments in their preparation to meet the governance and
accountability requirements. 
•   Internal and External Audit will be responsible for auditing departmental procedures to ensure compliance. 
Accountability 
Moray Council is committed to providing fairness and transparency in the way we procure and all those involved must be responsible for the
discharge of their duties in all procurement activities. In the procurement process there are three key distinguishable roles, they are: 
•   The Head of Service, who will determine the service procurement strategy, prioritising the procurement activity and ensuring that there are
sufficient authorised resources to meet their requirements. Given the strategic importance of the Department’s role in the delivery of
compliant procurement, an annual Departmental Procurement Action Plan is developed with each Head of Service which is used to inform the
procurement priorites for the coming year/eighteen months.. 
•   The Lead Officer/Budget Manager, who perceives the need and makes out the business case to obtain any necessary approval to spend, then
commissions the appropriate procurement process. Lead officers may also be assigned to a defined list of commodities and they will represent
and take responsibility for the Council in all procurement matters pertaining to the assigned commodity
• The process for H&SCM and Children’s Services differs from the above, in that they have commissioning teams who co-ordinate the early
commissioning function and support the longer term contract management.   An action has been added to the Procurement Action Plan
2023/24 to review the Procurement Procedures to reflect this different approach.
Page 119

Page 120

22 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
•   The purchaser, who fulfils the procurement role, is responsible for ensuring that the procurement process fully complies with Procurement
Procedures. 
Six levels of procurement responsibility have been identified and only officers who have completed the mandatory training course can procure
onbehalf of the Council. All procurements undertaken by trained officers will be supported by the procurement team. 
Contract Management 
The purpose of contract management is to ensure that all parties to a contract fully meet their respective obligations as efficiently and effectively as
possible, delivering the business and operational outputs required from the contract and providing value for money. It also protects the rights of the
parties and ensures required performance against key targets. 
The main requirements of the Moray Council approach are: 
• All contracts will include quality and performance standards to ensure that the Council achieves value for money from its suppliers 
• All contracts will be subject to continual review to ensure suppliers are meeting the agreed performance standards.  This will include holding
review meetings at suitable intervals 
• There will be a clear understanding and monitoring of contractual and supplier risk 
• There will be effective handling of contract changes 
• A good working relationship will be maintained with all suppliers which includes clear channels of communication 
The management of a contract is the responsibility of the departmental Lead Officer.  The procurement team provides support for contract where performance
is in question and improvement is required. 
Page 120

Page 121

23 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
Collaboration 
The Council recognises that collaboration in procurement can achieve significant benefits such as: 
•   Reduced duplication of procurement effort 
•   Better utilisation of scarce resources and skills 
•   Aggregation of spend to create greater purchasing power which will, in return, result in greater cost savings 
•   The spread of best practice 
Collaboration can take place at a number of levels : 
National – through Scottish Procurement and Commercial Directorate (category A contracts) 
Sectoral – the Council is a member of Scotland Excel, the Centre of Procurement Expertise for local authorities
(category B contracts) 
Local – direct collaboration with other neighbouring organisations i.e. Highland or Aberdeen City and Shire Councils (category C1 contracts) 
Organisational – utilising existing collaborative arrangements put in place by other organisations e.g. Scottish Procurement Alliance, Scottish Housing
Association, etc (category O contracts) 
Page 121

Page 122

24 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
We will actively collaborate wherever possible, subject to detailed contract assessment of the resultant offering to ensure that it meets our
aims and objectives. 
Contract Register 
A corporate contract register is updated monthly and published on the Council website, giving internal management and external visibility of all
contracts awarded by the Council thus promoting transparency and fulfilling our duty under the Act. The register is updated by the procurement team as
procurements progress through to award. Lead Officers provide benefit information at award stage through an Impact Statement which outlines the
benefits and added value the Council will take from the contract. 
This data is used annually to report statistical information to Policy and Resources Committee on the Council’s procurement activity carried out in the
past year and the overall benefits achieved (both cash savings and non-cash benefits). 
Demand Management 
The centralised Procurement operation in place for Moray  Council includes the provision of a central buying team. Well versed in corporate contract content,
they receive all Council requisitions (apart from any purchase made via a stock system), source the need and place the order. This centralised focus allows
the Council to manage immediate orders, specialist requirements and build on the management information produced to meet changing demands.
Working with contracted suppliers we can look for added value within a contract, manage our rationalised lists and identify opportunities based on
requested demand. 
Strategic considerations for individual projects 
In addition to the process employed by Moray Council to deliver the contracts, purchases and payments, during the development of any requirement there
is a wider consideration of economic, social and environmental factors that will also support the organisation’s ultimate aims. This wide ranging
consideration is documented within each procurement strategy and the achievements against the aims set monitored throughout the life of the contract
via our contract management arrangements.  A summary of the tender development and contract award is prepared for Service Heads at the end of each
Page 122

Page 123

25 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
project, providing information on the sustainability content and financial impact of the resultant contract. 
Responsibilities under the Procurement Reform (Scotland) Act 2014 
Economic
The Council is committed to using a mixed supply base to help stimulate innovation and value for money. An important element of this is support for small
and medium sized enterprises (SMEs) and voluntary third sector suppliers to make it easier for them to compete for Council contracts. The Council have
an on-going ambition to maximise local procurement opportunities whilst still meeting its legal obligations under Scottish law. 
The Council aims to encourage local regeneration: 
•   Advertise all opportunities over £5,000 but under £50,000 on PCS (quick quote) – to include at least one local supplier and/or 1 SME 
•   Consider SME involvement in opportunity at procurement strategy stage 
•   Make best use of PCS ‘Supplier Finder’ functionality for supplier selection 
•   Attend and support relevant partner events (Business Gateway, TSI Moray, etc.) 
•   Hold supplier events – roadshows, surgeries and meet the buyer events as required 
•   Make full use of our full membership of the national Supplier Development Programme (SDP) at Board, Regional and local level.   
•   Sit on a local forum made up of Council procurement, Economic & Development, HIE, UHI, NHSand Business Gateway– to discuss and support supplier
development in Moray.  This forum will work to encourage local supplier engagement with the opportunities presented by the Council and through
Page 123

Page 124

26 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
community wealth building also look at opportunities with other anchor organisations in Moray 
•   Provide supplier debriefs post contract award – to provide performance feedback 
•   Develop reports to show local and SME involvement in Council procurement activity 
•   Make the procurement process proportionate to the complexity, risk and value of contract 
•   Where appropriate make use of contract lotting to allow SMEs to compete for the opportunity 
•   Encourage the creation of reusable supplier e-tendering profiles) within PCS-T 
•   Consider the potential use of reserved contracts (see page 26) where the opportunity allows for such a structure 
• Consider the supply chain involvement in council procurements – particularly around our use of frameworks and subsequent contractors’ use of
local sub-contractors. 
•   Develop contract clauses that look for investment in the skills development of the workforce and insist on prompt payments of sub-contractors in our
contracts 
Page 124

Page 125

27 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
Social 
The issues that will be considered during a procurement project are wide ranging and include the social wellbeing of the citizens of Moray. Resilient and
inclusive local economies which enhance wellbeing are also part of the ethos of community wealth building. Wherever possible the resultant contract
should try to promote good quality and affordable housing, safer communities, supporting children and young people, access to art and leisure
opportunities, education. Health related factors are also to be considered to ensure that should our contracts have an impact in this area, it is a positive
one. Encouraging the voluntary sector and supporting the Community Empowerment (Scotland) Act 2015 may also influence the content of specification
and resultant contract. 
The examples above highlight the areas that have been specifically listed in the guidance that supports the Procurement Reform (Scotland) Act 2014 but
are not exhaustive. Promoting positive outcomes for Moray citizens should always be one of the key drivers when developing a procurement project. 
Environmental 
The Council commits to improve our management practices to reduce our impact on the environment. Our procurement objectives in this area link to
the Councils Climate Change Strategy (insert link) which set a goal of being carbon neutral by 2030.  Specific actions have been asked of procurement
which include: 
• The inclusion of statements around climate change in relevant contracts.
• Deliver and Record climate change sustainability benefits achieved through the procurement process
• Continue to deliver sustainable procurement guidance to officers to raise awareness of climate change aspects in the procurement process 
Page 125

Page 126

28 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
Other commitments 
Equalities – The Council is committed to equality of opportunity in the procurement process. We aim to: 
•   Ensure that all tender opportunities are fair and transparent 
•   Require companies tendering for Council contracts to practice equalities in employment and service delivery 
•   Carry out Equality Impact Assessments on services to be procured, where relevant and proportionate, to ensure that services meet the needs of our  
service users 
•   Carry out Equality Impact Assessments on the procurement process to ensure equal treatment and non- discrimination of contractors. The process
will be reviewed every 3 years 
•   Include equality issues in our contract management process 
•   Consider the use of award criteria that will assist the Moray Council in meeting its Public Sector Equality Duties.  These criteria will be based on the
Equality Impact Assessments of the services to be procured 
Ethical Procurement – the Council assigns great importance to the role of the local authority in encouraging ethical dealings. The Council therefore commits
to support, and promote the use of fair trade products where feasible. 
Provision of food/animal welfare – all regulated procurement involving the provision of food will consider the potential impact of the food source in the
strategy. For any national or sectoral contracts, the Council will request similar considerations at the specification development stage. 
Reserved contracts – we will consider the use of reserved contracts for supported businesses where the opportunity allows for such an approach. Where a
business has as its main aim to socially and professionally integrate disabled or disadvantaged people we will consider reserving the contract opportunity to
this sector. 
Health & Safety – the Council will promote health and safety within the workforce in particular adherence to the Health & Safety at Work Act 1974
Page 126

Page 127

29 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
Workforce – the Council internally promotes a positive workforce culture and would seek the same from its contractors, including but not limited
to:: 
•   A positive recruitment and retention policy 
•   A positive package of remuneration measures, including the supplier’s approach to payment of the living wage 
•   Training and support 
•   Ensuring zero hours contracts are not used inappropriately 
•   Flexible working 
•   Career breaks 
The Scottish government’s Fair Work First (insert link) guidance provides examples of how workplace practices can be strengthened to enhance worker’s
experience at work and this is carried through into the Moray procurement process with the use of weighted questions where appropriate.
Moray Council achieved Living Wage accreditation in September 2022 which highlighted the impact council contracts have over the payment of the living
wage by relevant suppliers.  This work continues by the inclusion of Living Wage criteria in every tender. 
Page 127

Page 128

30 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
Procurement Measurement 
Procurement development targets are set each year in the Procurement Action Plan.  These targets are based around legislative changes and guidance
from a number of sources:
Scottish Government Policy Notes 
Sectoral Best Practice Guidance
The Procurement Training Programme
Lessons Learned process carried out for each tender
Supplier Development Forum input
Compliance activity 
Progress against these targets is reported the following year in the Procurement Annual Report   
In addition to the development actions identified above the Procurement team also prepare a plan of procurement activity based on the information
collected through an annual referral process with Heads of Service. This process considers: 
•   expiring contracts for the department at all levels 
•   category A, B, C, and O new requirements 
•   changing responsibilities 
•   resources 
• off contract spend 
This information is used to create a Departmental Procurement Action Plan for each service.  The resultant plans are then collated into a Council wide
Page 128

Page 129

31 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
Glossary
Procurement Activity Plan. 
Monthly updates reporting progress on all procurement activity is provided to the Chief Financial Officer. 
Glossary
Aggregation – Adding together the value of separate contracts for the same supply, works or service 
Annual Report – Legislative requirement to publish performance against strategy objectives 
Award Stage – this is the stage when the tender evaluation panel determine who the preferred bidder/s are that will be awarded the contract post
standstill period 
Best Practice – The most effective and desirable method of carrying out a function or process derived from experience rather than theory 
Best Value – Considers price, quality and sustainability to determine the best outcome 
Community Benefit Clause (CBC) – Clauses incorporated into a specification that look for certain benefits from the resultant contract relating to the local
community. 
Community Wealth Building – an approach which uses the Council’s procurement of goods and services along with those of other anchor organisations to
add value to the local economy 
Contract – A contract is an obligation, such as an accepted offer, between competent parties upon a legal consideration, to do or abstain from doing
some act. The essential elements of a contract are: an offer and an acceptance of that offer; the capacity of the parties to contract; consideration to
support the contract; a mutual identity of consent; legality of purpose, and sufficient certainty of terms 
Contract Administration – The administration surrounding the award of a new contract: 
Page 129

Page 130

32 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
•   Supplier relationship (Account Manager)
•   Contract adoption arrangements (launch)
•   Communication arrangements
•   Management Information
•   Catalogue
•   Order process
•   Delivery arrangements
•   Billing and Payment process
•   Complaint 
Contract Management – The management surrounding the contract delivery, carried out by the person responsible for the contract (Lead
Officer) 
Contract Value – The total monetary value of a contract over its full duration (not annual value) including any possible extension periods 
Contract Register – A record of contracts awarded by the organization – published on the Council’s website 
Contractor – An organisation or individual who has entered into contract to undertake works, supply goods or provide services 
Departmental Procurement Action Plan – An annual process during which Service Heads and the procurement team determined the procurement priorities
and resources for the coming financial year 
Government Procurement Agreement (GPA) -This is an agreement of World Trade Organisation (WTO) members to mutually open up their markets for
selling goods and services to governments, often including regional and local governments 
Impact Statement – the record of the impact of any awarded or adopted contracts on Moray Council, both financial and non financial 
P2P - Procure to Pay or Purchase to Pay covering all the processes within a Procurement lifecycle, namely Requisitioning, Purchasing and Payment 
Procurement Officers/Team – officers who support the Departmental Lead officers during individual procurement projects 
Page 130

Page 131

33 | p r o c u r e m e n t s t r a t e g y 2 0 2 1 / 2 0 2 2
Quality – The level of fitness for purpose which is specified for or achieved by any service, work or product 
Public Contracts Scotland Advert – www.publiccontractsscotland.gov.uk National advertising portal for public sector contracts add web
address 
Public Contracts Scotland Tender – www.publictendersscotland.publiccontractsscotland.gov.uk National electronic tendering portal for the management of
the tendering process for both the suppler and public sector buyers 
Specification – a detailed description of the supplies or services to be purchased 
Sub-contracting – The process where a contractor assigns part of the contract to another contractor(s) 
Sustainability – The economic, environmental and social issues to be considered in a procurement exercise including Climate Change and Fair Work. 
Tender – a written offer to contract to provide goods or services or works precisely as specified in the tender documents at a stated price or rate. Successful
tenders result in the award of a contract to deliver the goods, services or works specified. 
Page 131

Page 132

Page 132

Page 133

APPENDIX 3
MORAY COUNCIL PROCUREMENT ACTION PLAN (PAP) 2023/2024
PART 1 -  PCIP Measurements
Data Warehouse
Action Timetable Aim 
1.1 
To develop existing contract register to  
maximise on required functionality         
ICT dependent 
March 2024
Carried forward from 2021/22 
Functionality requests submitted to ICT to improve access to data and ease of
use
To meet Statutory and Council requirements 
1.2
Work with SXL to compare contract spend
to actual supplier spend  Sept 2023 
To ensure that SXL is capturing the accurate supplier spend from their contract 
– when compared to our Accounts Payable supplier turnover 
1.3
Expand the current purchasing card
(embedded) process to Education
Materials supplier 
Sept 2023 
To link directly to the online supplier web site for educational material orders
which are them paid by embedded purchasing cards, increasing the  Pcard
rebate received 
Leadership & Governance
1.4 
Health &Social Care (MIJB) Support  Ongoing 
Targeted support to develop infrastructure for MIJB
Maintain contract timeline for monitoring purposes. 
Establish DPAP process or similar to manage Planned Work
Support the development of new procedures and documentation and establish
how they fit with the procurement process 
1.5   
Item 10.
Page 133

Page 134

Review and update  the Procurement
Procedures to reflect the inclusion of
commissioning teams within H&SCM and
Childrens Services 
March 2024
Identify the areas where commissioning changes the current procurement
process
Agree interaction points with the commissioning teams
Document the changes 
1.6 
Supplier Development Programme (SDP)
and Community Wealth Building  Throughout
the year 
To continue to support Economic Development with the membership of SDP
through the Moray Supplier Development Forum
To support the development of a local Community identified benefits system
and embed into relevant procurement projects
To meet community wealth building expectations 
1.7 
Review the Procurement Savings Strategy
(written in 2016) 
March 2024  To establish if still relevant and consider the level of savings sought from each
tender (currently 3%)
Development & Tender
1.8
To support and deliver requirements
identified in the Climate Change Action
Plan 
Throughout
the year 
To meet climate change action plan expectations and the procurement specific
actions within the climate change action plan 
1.9
Review the requirement for Equalities
Impact Assessments for each contract 
Dec 2023  Meet with Equalities officer and review the individual procurement
requirement
1.10
Review the GDPR requirements  Dec 2023  Meet with the Records Officer and review the areas which are impacted by
GDPR (care, etc) 
Contract   
Key Purchasing Processes   
Page 134

Page 135

PART 2 – Procurement Measurements.   
a. Savings  
Measure Target  Will Demonstrate 
A1 Percentage of all council expenditure covered by contracted
suppliers
Total commercial spend – contract register annual estimated
values for live contracts in year 
95% Greater contractual exposure 
A2 Value of procurement savings achieved through contracts live
during the year £1M The financial results from contracts   
A3 Number of collaborative contracts awarded as a percentage of
all commenced in year  40%  Successful collaboration 
A5 Percentage of contracts (including call off from framework) 
commenced in year that contain a contract benefit (all categories)  85%% Increasing focus on non-financial benefit 
b. Contracts   
B2 Percentage of unplanned/ activity during the year  25%  Measure to try and keep unplanned to a minimum 
c. Compliance   
C3 Percentage of Account Payable transactions with a Purchase
Order (where relevant ie non-recurring) number during year
75%% Compliance management 
Page 135

Page 136

Measure Target Will Demonstrate
d. Accessibility  
D1 Percentage of  contracts (including call offs)  commenced
during year to SMEs 82% SME access to our business – volume  
D2 Percentage value of annual spend with SMEs for year 55% SME access to our business – by value 
D3 Percentage value of spend with Moray, Highland and
Aberdeen council areas 50% “local” access to our business – value 
D4 Number of “events” held or participated in during year  10 Supplier engagement and internal training sessions
e. Community Benefits  
E1 Percentage of commenced contracts within the year that have
a community benefit (category 7) 20% Sustainable duty performance
E2 Percentage of collaborative contracts commenced in the year
that have a community benefit (category 7) 20% Sustainable duty performance 
f. Sustainability  
F1 Percentage of contracts commenced in the year that have
incorporated a sustainable target (category 5) 20%  Sustainable duty performance  
F2 Score on Flexible Framework Level 3 Sustainable duty performance   
Page 136

Page 137

REPORT TO: CORPORATE COMMITTEE ON 29 AUGUST 2023 
SUBJECT: TRUST FUNDS – SUMMARY EXPENDITURE FOR 2022/23 AND
ESTIMATED DISPOSABLE INCOME FOR 2023/24 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform Members of the disbursements made from Trusts in 2022/23 and
the estimated disposable income available for disbursement in 2023/24 
1.2 This report is submitted to Committee in terms of Section III B (20) of the
Council's Scheme of Administration relating to the Management and
Investment of any funds including Common Good and Trust Funds. 
2. RECOMMENDATION 
2.1 The Committee is asked to: 
(i) Note the disbursements made from each of the Trust Funds in
2022/23, shown in APPENDIX 1; and 
(ii) Agree the estimated income available for disbursement in 2023/24,
shown in APPENDIX 2 
3. BACKGROUND 
3.1 The Council administers 37 trust funds in total, acting as sole trustee for 33
trusts and as one of several trustees for the other four trust funds. The trust
funds represent legacies bestowed by various individuals and organisations
for the benefit of the community or organisations within Moray. 
3.2 Moray Council acts as sole trustee for 8 Connected Charity trust funds which
have charitable status and are registered with the Office of the Scottish
Charity Regulator (OSCR). The Council are one of several trustees for one
other OSCR registered trust fund. The remaining 28 trusts are unregistered
with Moray Council being sole trustee for 25 of these and one of several
trustees for the other three.
Item 11.
Page 137

Page 138

3.3 Since 2013/14, the Registered Charitable Trusts require to be audited by an
external auditor who is appointed by the Accounts Commission, currently
Grant Thornton.  This only applies to any Charitable Trust for whom the
Council is the sole trustee. Any Charitable Trust for whom the Council is not
the sole trustee requires to be examined by an Independent Examiner; Azets
(previously Scott-Moncrieff) has been appointed as Independent Examiner for
the Auchernack Trust. 
3.4 Policy and Resources Committee on 2 September 2008 (paragraph 11 of the
Minute refers) agreed to only disburse grants from trusts where the disposable
income is greater than £50 and to carry forward undistributed funds each year
until the disposable income reaches £50.  Policy and Resources Committee
on 8 October 2013 (paragraph 8 of the Minute refers) agreed that the whole
annual income of the trust will be made available for disbursement in
accordance with the trust deed (prior to this one third of the income was
reinvested) although the policy not to disburse any Trust Fund with disposable
income under £50 remains. 
3.5 Reports to The Moray Council on 14 November 2012 (paragraph 7 of the
Minute refers) and 24 June 2015 (paragraph 10 of the Minute refers) agreed
to a scheme of Trust reorganisation, and approved the proposal for setting up
a new trust along with the wording of the proposed Trust Deed. 
3.6 In August 2016 OSCR awarded charitable status to the new trust: The Moray
Council Charitable Trust (TMCCT) (SC046791) with the planned transfer of 27
individual connected charitable trusts into the new trust. The trusts being
reorganised into this new single trust will be utilised, as far as possible, in a
manner consistent with the original trust purposes. 
3.7 In 2018/19 one trust was given approval to be reorganised into TMCCT and
during 2020/21 a further 23 trusts were approved by OSCR for reorganisation. 
3.8 TMCCT has been set up with nine sub categories based on location and
charitable purpose, in order to keep in a manner consistent with the original
trust purposes. The sub categories are: 
• TMCCT Dufftown (poverty)
• TMCCT Elgin (age related)
• TMCCT Elgin (poverty)
• TMCCT Elgin (recreational)
• TMCCT Elgin & Forres
• TMCCT Forres (age reasons)
• TMCCT Forres (poverty)
• TMCCT Keith (financial)
• TMCCT Lossiemouth (poverty) 
Page 138

Page 139

4. DISBURSEMENTS IN 2022/23 
4.1 APPENDIX 1 gives details of the disposable income and disbursements made
during 2022/23 from each trust fund. 
4.2 In total, £84,765 was awarded in the year from twelve of the trust funds.
Disbursements included £62,792 from the Education trusts, Moray & Nairn,
Banffshire, Donald Manson Fund and the Milne’s Institution Trust; £9,508 from
the Auchernack trust; £2,669 from the Logie Cottages Trust and £7,285 from
The MacDonald Benevelovent Fund. A further £2,511 was awarded from
other Trusts. 
4.3 Following the sale of 3 Logie Cottages, Forres it was agreed at a meeting of
the Economic Growth, Housing and Environmental Sustainability Committee
on 1st December 2020 (paragraph 22 of the Minute Refers) that the money
generated from the sale be used for the attainment of pupils at Forres
Academy whilst respecting the original aims of the Trust as much as
practicable.  As part of the plan for using the proceeds of the Trust, it was
identified that there was significant interest in the provision of access to warm
spaces and food after school to those in need.  £2,669 was disbursed from
the Trust in 2022/23 to assist with the purchase of kitchen equipment in
support of providing this service. 
5. 2023/24 DISPOSABLE INCOME 
5.1 APPENDIX 2 shows the estimated disposable income for each trust fund in
2023/24. The estimated income figure is calculated to assist Local Members’
decision making when awarding funds. The figures are only there as a guide.
The total projected funds available for disbursement in 2023/24 is £140,937.
Of this, £1,040 is undisbursed from 2022/23.  There is £20,158 of committed
expenditure.  £5,300 is from disbursements agreed by Council in respect of
the the cost of living crisis which have been paid out in 2023/24, £11,920 from
disbursements agreed to be made from the Auchernack Trust as agreed at
their meeting on 1st June 2023 and £2,938 from the Moray & Nairn
Educational Trust. 
5.2 The reorganisation has reduced the number of trusts that have either nil or
less than £50 disposable income, ensuring that as much income as possible
from the trust funds can be passed on to beneficiaries as efficiently as
possible. There are still some trusts that have loans pool balances invested in
the Council’s Loans Fund, and they earn annual interest on this balance,
however a share of administration costs is also allocated to these trusts and
this then reduces the available income to below the £50 threshold. 
5.3 In the calculation of disbursable income for 2023/24 it is recognised that
continued homeworking for many has impacted car park income which affects
the River Lossie and Cooper Park trusts.  Investment income earned on
endowment investments could also vary depending on the markets. With this
in mind, a prudent estimate for both has been projected.
Page 139

Page 140

5.4 The interest on balances held in the Council’s bank for 2023/24 has been
calculated using the two year fixed PWLB rate as at 1 April 2022 of 2.35%. 
5.5 The estimated administration charge to be allocated over all trusts in 2023/24
is £18,550 (actual 2022/23 £17,617 and 2021/22 £12,914). 
6. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Although there is no direct link to the Moray 2026 Corporate Plan, the
reorganisation of the Trusts will result in efficiencies within the Trust
funds. 
(b) Policy and Legal
The Council’s adoption of the policy of disbursing the whole annual
income maximises funds available for disbursement. 
(c) Financial implications
In 2022/23 there was £166,153 of funds available for disbursement with
£84,765 disbursed in the year from twelve of the trust funds, as identified
in APPENDIX 1. 
APPENDIX 2 shows the estimated disposable income for each trust fund
in 2023/24. The total projected funds available for disbursement in
2023/24, plus carry forwards of undisbursed income from 2022/23, is
£140,937 for trusts with available income over the minimum £50 level.
The carry forward from the Moray and Nairn Educational trust is
permitted through the deeds of the trust, allowing a carry forward of any
unspent funds into the following year. 
The amount committed to date is £20,158 as shown in APPENDIX 2. 
(d) Risk Implications
There is a risk of overspends exceeding disposable income if any
unforeseen emergency major repairs are required for properties owned
by Trust Funds. Close monitoring of costs and the condition of properties
will be undertaken by officers in order to mitigate this risk. 
(e) Staffing Implications
There are no staffing implications arising from this report. 
(f) Property
The condition of all Trust Fund properties will be monitored in order to
keep reactive repairs to a minimum. 
(g) Equalities/Socio Economic Impact
There are no equalities issues arising directly from this report.
Page 140

Page 141

(h) Climate Change and Biodiversity Impacts
There are no climate change and biodiversity impacts arising directly
from this report. 
(i) Consultations
Local Members are consulted on discretionary disbursements particular
to their ward. 
7. CONCLUSION 
7.1 Details of disbursements for 2022/23 for each Trust Fund are detailed in
APPENDIX 1 and the estimated income available for disbursement for
each Trust Fund for 2023/24 is shown in APPENDIX 2. 
Author of Report: Susan Alexander, Accountant
Background Papers: 
Ref: SPMAN-1293228629-936 
Page 141

Page 142

Page 142

Page 143

APPENDIX 1
Trust Funds Disbursements 2022/23 APPENDIX 1
Ward TRUST FUND Total Actual
Available for Disbursement
Disbursement
2022/23 2022/23
£ £
All Burial Grounds PERPS 628                       628                      
All JB Mair Fund 775                       -                           
All Burial Grounds TRUSTS 183                       183                      
All The Moray Council Charitable Trust 3,858                    -                           
Elgin North Craigmoray Bequest(Bishopmill) 11,697                  -                           
Elgin North John Pringle Bequest 1,160                    100                      
Elgin South/North Laing Mortification 7,319                    -                           
Elgin South/North Young 200                       -                           
Fochabers Lhanbryde Milne's Institution Trust 14,585                  7,916                   
Forres Auchernack 19,953                  9,508                   
Forres Donald Manson (Edinkillie) Fund 9,980                    9,980                   
Forres Donald Manson (Forres Burgh) Fund 2,547                    2,547                   
Forres Logie Cottages, Forres -                            2,669                   
Heldon & Laich Boyd Anderson Trust 399                       -                           
Keith & Cullen Glenisla Comforts Fund 4,163                    -                           
Keith & Cullen William Lawtie 3,448                    -                           
Old Banffshire Boundary Banffshire Educational Trust 27,876                  27,497                 
Old Moray Boundary Moray & Nairn Educational 20,518                  14,752                 
Old Moray Boundary The Pringle Trust 2,403                    1,700                   
Public Trust River Lossie 11,293                  -                           
Public Trust Grant Park 2,385                    -                           
Public Trust Cooper Park 12,030                  -                           
Speyside Glenlivet The MacDonald Benevolent Fund 6,893                    7,285                   
Speyside Glenlivet Speyside Comforts Fund 1,860                    -                           
TOTAL 166,153                84,765                 
Trusts with Disposable Income under £50
Ward TRUST FUND Total Actual
Available for Disbursement
Disbursement
2022/23 2022/23
£ £
Elgin South/North Young -                            -                           
Elgin Jubilee Cottages -                            -                           
Elgin Ladyhill Cottages -                            -                           
Forres Castlehill Trust -                            -                           
Forres Grant Park Trust -                            -                           
Keith & Cullen Keith Poor Funds -                            -                           
Speyside Glenlivet Dufftown Food -                            -                           
TOTAL -                            -                           
Item 11.
Page 143

Page 144

Page 144

Page 145

APPENDIX 2
Trust Funds Projected Disbursement 2023/24 APPENDIX 2
Ward TRUST FUND Projected Undisbursed Total Committed
Disposable Income Available for Expenditure
Income Disbursement
2023/24 2022/23 2023/24 2023/24
£ £ £ £
All Burial Grounds PERPS 605                   -                       605                       -                      
All JB Mair Fund 834                   -                       834                       -                      
All Burial Grounds TRUSTS 160                   -                       160                       -                      
All The Moray Council Charitable Trust * 4,434                -                       4,434                    3,791               
Elgin North Craigmoray Bequest(Bishopmill) 12,834              -                       12,834                  -                      
Elgin North John Pringle Bequest 1,299                -                       1,299                    -                      
Elgin South/North Laing Mortification 7,465                -                       7,465                    1,509               
Elgin South/North Young * 189                   -                       189                       -                      
Fochabers Lhanbryde Milne's Institution Trust 8,694                8,694                   
Forres Auchernack ** 22,093              -                       22,093                  11,920             
Forres Donald Manson (Edinkillie) Fund 11,531              -                       11,531                  -                      
Forres Donald Manson (Forres Burgh) Fund 2,919                -                       2,919                    -                      
Forres Logie Cottages, Forres 1,999                1,999                   
Heldon & Laich Boyd Anderson Trust * 664                   -                       664                       -                      
Keith & Cullen Glenisla Comforts Fund 4,602                -                       4,602                    -                      
Keith & Cullen William Lawtie 3,383                -                       3,383                    -                      
Old Banffshire Boundary Banffshire Educational Trust 21,355              21,355                  -                      
Old Moray Boundary Moray & Nairn Educational * 15,123              1,040               16,163                  2,938               
Old Moray Boundary The Pringle Trust 2,275                -                       2,275                    -                      
Public Trust River Lossie 6,883                -                       6,883                    -                      
Public Trust Grant Park 951                   -                       951                       -                      
Public Trust Forres Squash Courts 560                   -                       560                       -                      
Speyside Glenlivet The MacDonald Benevolent Fund 6,994                -                       6,994                    -                      
Speyside Glenlivet Speyside Comforts Fund 2,051                -                       2,051                    -                      
TOTAL 139,897            1,040               140,937                20,158             
Trusts with Disposable Income under £50
Ward TRUST FUND Projected Undisbursed Total Committed
Disposable Income Available for Expenditure
Income Disbursement
2023/24 2022/23 2023/24 2023/24
£ £ £ £
Elgin Jubilee Cottages -                        -                       -                            -                      
Elgin Ladyhill Cottages -                        -                       -                            -                      
Forres Castlehill Trust * -                        -                       -                            -                      
Forres Grant Park Trust * -                        -                       -                            -                      
Forres Cooper Park -                        -                       -                            -                      
Keith & Cullen Keith Poor Funds * -                        -                       -                            -                      
Speyside Glenlivet Dufftown Food * -                        -                       -                            -                      
TOTAL -                        -                       -                            -                      
*  To be audited by Grant Thornton
** To be audited by Azets
Item 11.
Page 145

Page 146

Page 146

Page 147

REPORT TO: CORPORATE COMMITTEE ON 29 AUGUST 2023 
SUBJECT: DRAFT ALLOTMENT REGULATIONS - PUBLIC CONSULTATION 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the requirement to make allotment site regulations
and to seek Committee approval for public consultation on the draft Allotment
Regulations, set out in Appendix 1 in accordance with the Council’s duties
under Part 9 of the Community Empowerment (Scotland) Act 2015 
1.2 This report is submitted to Committee in terms of Section III (B) (41) of the
Council's Scheme of Administration relating to formulating and reviewing
Council wide policy, strategies, priorities and objectives in relation to cross
cutting issues. . 
2. RECOMMENDATION 
2.1 It is recommended that the Committee: 
(i) approves in principle the draft Allotment Regulations set out in
Appendix 1; 
(ii) agrees to officers carrying out a public consultation on the draft
Allotment Regulations, in accordance with the Council’s duties
under Part 9 of the Community Empowerment (Scotland) Act
2015; and 
(iii) note that a report will be brought to this Committee after the
public consultation with details of any representations made
together with a proposed final version of proposed Allotment
Regulations, for consideration and approval.
Item 12.
Page 147

Page 148

3. BACKGROUND/ 
3.1 The revised Moray Council Allotment Policy (Appendix 2) was approved at
Corporate Committee on the 15 March 2022 (paragraph 10 of the minute
refers)  It was also agreed that the duty to maintain waiting lists, make
allotment site regulations and progress the provision of allotments in line with
the legislation be delegated to the Head of Education Resources and
Communities.  
3.2 Draft Allotment Regulations have been prepared (Appendix 1), which set out
the required regulations for allotments as set out by the Community
Empowerment (Scotland) 2015 Act.  This includes mandatory requirements
covering allocation of allotments, rent, cultivation, maintenance, buildings and
other structures that may be erected, the keeping of livestock, landlord
inspections and make provision for the delegation of some of the Council’s
functions in relation to allotments as set out in the revised allotment policy. 
3.3 In terms of Part 9 of the Community Empowerment (Scotland) 2015 Act public
consultation is required on the proposals before Allotment Regulations can be
adopted by the Council. In accordance with the legislation the following is
required:- 
• At least one month before making the regulations, the Council must place
an advertisement in at least one newspaper in circulation in the local
authority area giving notice of: 
o the Council's intention to make the regulations;
o the general purpose of the proposed regulations;
o where the proposed regulations can be inspected;
o the fact that any person can make written representations in relation to
the proposed regulations;
o provide a timescale within which someone can make representations, 
o provide the address to which representations must be sent.  
• The Council must make copies of the proposed regulations available for
inspection by the public without payment at its office, and if practical at the
allotment sites to which the regulations are to apply. 
• The public consultation process will be managed online though the Moray
Council consultation web page. This will provide access to the relevant
information and provide the means by which representation can be made. 
3.4 Following this period of public consultation a report with details of
representations and a proposed final version of proposed Allotment
Regulations will be brought back to Corporate Committee for consideration
and approval. 
Page 148

Page 149

4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) 
This report links to the Corporate Plan Priority 
• Empowering and supporting communities to build capacity 
And the LOIP outcome 
• Empowering and Connecting Communities 
(b) Policy and Legal
Under the terms of the Community Empowerment (Scotland) Act 2015
Section 9, The Council is required to produce draft allotment regulations
which must go out for public consultation 
(c) Financial implications 
There are no specific financial implications arising as a result of this
report.   
(d) Risk Implications 
If the consultation on the draft regulations does not take place, the
Council will be in breach of its statutory requirements under the
Community Empowerment (Scotland) Act 2015 
(e) Staffing Implications 
There are no specific staffing implications arising as a result of this
report. 
(f) Property 
There are no specific property implications arising as a result of this
report 
(g) Equalities/Socio Economic Impact
There are no equalities or socio-economic issues arising directly from
this report 
(h) Climate Change and Biodiversity Impacts 
Section 7 of the draft allotment regulations concerns the cultivation of
allotments and includes a clause about encouraging allotment tenants to
improve biodiversity within their allotment plot.
Page 149

Page 150

(i) Consultations 
The Head of Governance, Strategy and Performance; the Acting Head of
Education Resources and Communities; the Head of Housing and
Property: the Head of Economic Growth and Development; the Head of
Environmental and Commercial Services; the Chief Financial Officer,
Lindsey Robinson, Committee Services Officer; the Head of HR, ICT &
OD; the Human Resources Manager and the Equal Opportunities Officer
have been consulted on this report and are in agreement with the
contents as regards their respective responsibilities. 
5. CONCLUSION 
5.1 The Committee is asked to approve in principle  the draft Allotment
Regulations set out in Appendix 1 and that officers carry out a public
consultation on the draft Allotment Regulations , as required under Part
9 of the Community Empowerment (Scotland) Act 2015 
Author of Report: Dawn Brodie, Community Learning and Engagement
Manager 
Background Papers: Appendix 1: Allotment Regulations
Ref: SPMAN-9425411-267 
SPMAN-9425411-268 
SPMAN-9425411-269 
Page 150

Page 151

62364113v5 
Appendix 1 
MORAY COUNCIL 
ALLOTMENT REGULATIONS 
1 COMMENCEMENT 
1.1 These allotment regulations (the “Regulations”) adopted by resolution of Moray Council (the
“Council”) dated _________________ relate to all Allotment Sites owned and/or managed by the
Council or otherwise by an Allotment Association. The Regulations are made in accordance with the
Council’s powers under Part 9 of the Community Empowerment (Scotland) Act 2015 (the “2015 Act”). 
1.2 The Council discharges the duty to manage Allotment Sites through a system of delegation, through
which independently managed Allotment Associations enter into leasing arrangements with the
Council to operate allotments on Council owned land in terms of section 107 of the 2015 Act.  These
Regulations are made with the support of this statutory function and to support Tenants in
understanding their responsibilities and relationship with their respective Allotment Association.  
1.3 The Regulations shall come into force on the day after the date of execution under section 116 of the
2015 Act (the “Commencement Date”). 
2 INTERPRETATION 
2.1 In the Regulations, any reference to: 
(i) “Allotment Association” shall mean any allotment association, society or group leasing the
relevant Allotment Site from the Council;
(ii) “Allotment Plot” shall mean any single area of land designated as an allotment plot by the
Allotment Association within an Allotment Site;
(iii) “Allotment Site” shall mean any area of land owned or leased by the Council and leased to
the Allotment Association and consisting wholly or partly of allotments and including other land
that may be used by Tenants in connection with the use of their Allotment Plots;
(iv) "Allotment Site Rules" means site specific rules published by the Allotment Association from
time to time governing a particular Allotment Site, which rules will previously have been
approved by the Council (including any amendments to rules previously approved);
(v) "Allotment Tenancy" means a tenancy agreement between the Allotment Association and a
Tenant for an identified Allotment Plot;
Item 12.
Page 151

Page 152

2
62364113v5 
(vi) "Applicant” shall mean the person, persons or Third Party Organisation who have completed
a request for an Allotment Plot in the form prescribed by the Allotment Association; 
(vii) "Data Protection Laws" shall mean any law, statute, subordinate legislation, regulation,
order, mandatory guidance or code of practice, judgment of a relevant court of law, or
directives or requirements of any regulatory body which relates to the protection of individuals
with regard to the processing of Personal Data to which a Party is subject including the Data
Protection Act 2018 and any statutory modification or re-enactment thereof and the General
Data Protection Regulation (EU) 2016/679 of the European Parliament and of the Council of
27 April 2016 on the protection of natural persons with regard to the processing of personal
data and on the free movement of such data, and repealing Directive 95/46/EC;
(viii) “Eligible Person” shall mean a resident aged 16 years or over, who is solely or mainly
resident at premises the postal address of which is in the Council area or any Third Party
Organisation;
(ix) “Joint Tenancy” shall mean two or more individuals jointly responsible for an Allotment Plot;
(x) “Relevant Circumstances” shall mean any illness, bereavement, injury or disability, or other
extenuating circumstances; 
(i) “Relevant Period” shall mean 21 days;
(ii) “Residence” shall mean any residential property which is the sole or main residence of an
Eligible Person;
(xi) “Tenant” shall mean an Eligible Person, to whom an Allotment Plot has been leased in terms
of the Allotment Tenancy;
(xii) “Termination Date” shall mean the date upon which the Allotment Tenancy is terminated,
and the Tenant is required to remove all their possessions from the Allotment Plot and the
Allotment Site;
(xiii) “Third Party Organisation” means an organisation appropriately constituted with its
registered address, or where there is no registered address its principal business address, in
the Council area and which supports group allotment gardening;
(xiv) “Waiting List” shall mean the list established and maintained by the Allotment Association in
respect of each Allotment Site of Applicants; and 
(xv) “Micro Allotment Plot” shall mean a very small temporary allotment plot that may be used
to enable persons on the Waiting List to test their interest and ability to manage an allotment
plot.
2.2 References to “consent of the Allotment Association” or words to similar effect mean a consent in
writing signed by or on behalf of the Allotment Association and “approved” and “authorised” or words
Page 152

Page 153

3
62364113v5 
to similar effect mean (as the case may be) approved or authorised in writing by or on behalf of the
Allotment Association. 
2.3 Unless the context otherwise requires, words in the singular shall include the plural and words in the
plural shall include the singular.
2.4 Headings are for convenience, do not form part of these Regulations and shall not be used in their
interpretation. 
2.5 Any references to a specific statute include any statutory extension, amendment, modification or re-
enactment of such statute and any subordinate legislation made thereunder and any general reference
to “statute” or “statutes” includes any subordinate legislation made thereunder. 
2.6 Where there is a contradiction between these Regulations and the 2015 Act the terms of the 2015 Act
shall apply. 
2.7 Where there is a contradiction between these Regulations and the Allotment Site Rules, these
Regulations shall have priority. 
2.8 Allotment Site Rules and any subsequent amendments will be subject to prior written approval by the
Council. 
3 EFFECT OF REGULATIONS 
3.1 Failure by the Tenant to comply with the terms of these Regulations shall be a breach of the
Regulations and may result in the Tenant being subject to termination of the Allotment Tenancy for
the Allotment Plot in accordance with section 126 of the 2015 Act. 
4 ALLOCATION OF ALLOTMENT PLOTS 
4.1 A request for an Allotment Tenancy must be made by submitting an application to the Allotment
Association in the form to be prescribed by the Allotment Association in their Allotment Site Rules. 
4.2 Applications must include the applicant’s: 
4.2.1 name;
4.2.2 address;
Page 153

Page 154

4
62364113v5 
4.2.3 date of birth;
4.2.4 preferred Allotment Site(s);
4.2.5 preferred size of Allotment Plot; 
and may include the applicant’s:
4.2.6 email address (if applicable); and
4.2.7 Relevant Circumstances (if applicable) that the applicant wishes the Allotment Association
to be aware of.
4.3 The Allotment Association must comply with the requirements of the Data Protection Laws to ensure
that the Tenants' personal information is held securely and only lawfully disclosed.   
4.4 All Eligible Persons who apply for an Allotment Plot shall be placed on the Waiting List(s) for the
Allotment Site(s) requested. 
4.5 The Allotment Association shall maintain a Waiting List for each Allotment Site and will offer an
available Allotment Plot to the first applicant on the Waiting List for the relevant Allotment Plot having
regard to what has been requested and the provisions of the 2015 Act. 
4.6 The Allotment Association shall report to the Council annually confirming the following:- 
4.6.1 The proportion of land on each Allotment Site that is not subject to an Allotment Tenancy; 
4.6.2 The annual subscription fee payable for each Allotment Plot on each Allotment Site; 
4.6.3 How the annual subscription fee was decided by the Allotment Association;
4.6.4 The number of Applicants on the Waiting List on a per Allotment Site basis; 
4.6.5 The number of Applicants who have been on the Waiting List for a continuous period of
more than 5 years on a per Allotment Site basis;
4.6.6 Number of Allotment Plots on a particular Allotment Site that are accessible by a disabled
person;
4.6.7 Number of Applicants applying for adapted Allotment Plots or for adjustment to existing
plots;
Page 154

Page 155

5
62364113v5 
4.6.8 Any such other information as may be prescribed by the Council.
The Council reserves the right to inspect any Allotment Sites and Allotment Association records
without giving prior notice to ensure that the Allotment Sites and Allotment Plots thereon are being
managed in accordance with these Regulations.
4.7 If the Allotment Association offers an Applicant an Allotment Plot which is not of the size specified by
the Applicant, the Applicant will remain on the Waiting List, unless the Applicant accepts the offer, in
which case the request will be treated as agreed and the Applicant will be removed from the Waiting
List. Where the Allotment Association makes an offer of an Allotment Plot of the size requested and
such offer is unreasonably refused the applicants may be removed from the Waiting List.
4.8 Tenants may make a request in writing to Allotment Association to move to a different Allotment Site.
In considering whether to allow a move to a different Allotment Site the Tenant’s application date must
be prior to the application date of any Waiting List customers for the Allotment Site requested.   In
considering whether to allow a move to a different Allotment Site the Council or Allotment Association
shall have regard to the length of relevant Waiting List and to the cultivation and maintenance of the
Tenant's current Allotment Plot and any Relevant Circumstances of the Tenant.
4.9 Tenants may make a request in writing to the Allotment Association to move to a different Allotment
Plot. In considering whether to allow a move to a different Allotment Plot the Allotment Association
shall have regard to the length of relevant Waiting List and to the cultivation and maintenance of the
Tenant's current Allotment Plot and any Relevant Circumstances of the Tenant.
4.10 Micro Allotment Plots may not be an option available for an Applicant to select as their preferred size
of Allotment Plot. The Allotment Association may offer an available Micro Allotment Plot to an Applicant
on a temporary basis. An Applicant who accepts a Micro Allotment Plot will maintain their position on
the Waiting List and be offered an Allotment Plot of the size they requested in their application, when
it becomes available. Applicants who accept a Micro Allotment Plot are required to comply with all
Regulations and sign an Allotment Tenancy on terms provided by the Allotment Association.
4.11 Where a new Allotment Site is established, the Allotment Plots within that Allotment Site (“New
Allotment Plots”) shall be allocated on the following basis:
4.11.1 Where reasonably practicable, 50% of the New Allotment Plots shall be offered to Eligible
Persons, who are solely or mainly resident in the area within one-kilometre radius of the
entrance to the new Allotment Site and who apply for a New Allotment Plot.
4.11.2 The remaining unallocated New Allotment Plots shall be offered to Eligible Persons on the
Waiting List for existing Allotment Sites. Individuals on Waiting Lists for existing Allotment
Sites who are solely or mainly resident in the area within two-kilometre radius of the
entrance to the new Allotment Site will be given priority.
Page 155

Page 156

6
62364113v5 
4.12 The Allotment Association will continually review demand for Allotment Plots and may change the size
of Allotment Plots; or split vacant Allotment Plots into smaller Allotment Plots or change the status of
a Micro Allotment Plot to an Allotment Plot. The Allotment Association may decide to reserve the above
e.g. to create larger Allotment Plots. The Allotment Association may require to change the size of
Allotment Plots due to other circumstances. 
4.13 All Tenants are required to sign an Allotment Tenancy on terms provided by the Allotment Association
at the start of their tenancy. The Tenant may not exchange Allotment Plots with any other Tenant,
transfer their Allotment Tenancy of an Allotment Plot to any other person, or sub-let their Allotment
Plot without the prior consent of the Allotment Association.
4.14 Where a Tenant is no longer an Eligible Person, the Allotment Association will terminate the Allotment
Tenancy.
4.15 The Allotment Association shall allocate a maximum of one Allotment Plot per Residence unless their
property is registered as a House of Multiple Occupancy.
4.16 Regulation 4.14 shall not affect Tenants who were allocated more than one Allotment Plot prior to the
Commencement Date.
4.17 Should an Allotment Site or Allotment Plot be removed from service all displaced Tenants will be
placed at the top of the Waiting List for either the Allotment Site in which the relevant Tenants' original
Allotment Plots were located, or an alternative Allotment Site as determined by the Allotment
Association. 
5 ALLOTMENT PLOT RENT 
5.1 The annual subscription fee under the Allotment Tenancy shall be paid annually, by a Tenant to the
Allotment Association on the date specified by the Allotment Association.  The annual subscription fee
shall be determined by the Allotment Association at its annual general meeting or by its management
committee, notified to the members and publicised through appropriate media and reported to the
Council. 
5.2 When determining the level of the annual subscription fee the Allotment Association shall take account
of:
5.2.1 the services provided by, or on behalf of, the Allotment Association to the Tenants of the
Allotment Sites, including but not limited to site improvements, general repairs and
maintenance, utility charges, grounds maintenance works;
5.2.2 the costs of providing those services;
Page 156

Page 157

7
62364113v5 
5.2.3 any concession applicable to the Tenant, as stated on the Council website from time to
time; and
5.2.4 the size of the Allotment Plot in terms of an Allotment Tenancy to a Tenant.
5.3 Changes to circumstances, including any Relevant Circumstances, affecting a Tenant’s ability to pay
rent should be advised in writing by the Tenant to the Allotment Association.
5.4 Concessions on the level of annual subscription fee payable shall only apply where all Tenants of an
Allotment Tenancy are eligible for a concession.
5.5 Where a Tenant fails to pay the annual subscription fee within the period prescribed by the Allotment
Association in their Allotment Site Rules (which for the avoidance of doubt shall not be less than 30
days after the later of the annual subscription falling due and/or the invoice date, if applicable) the
Allotment Association may recover the subscription fee from the Tenant in the same manner as any
other case of landlord and tenant, and the Allotment Association shall seek to recover the rent on a
pro rata basis for the period of time that the Tenant has occupied the Allotment Plot. In addition, the
Allotment Association shall be entitled to recover as a debt any administrative costs reasonably
incurred by it in respect of any delay in payment;  
6 BOUNDARIES AND POSSESSION OF ALLOTMENT PLOTS 
6.1 The Tenant may not exchange Allotment Plots with any other Tenant, transfer their Allotment Tenancy
to a third party, or sub-let their Allotment Plot without the prior consent of the Allotment Association.
6.2 If there is any dispute between Tenants as to the boundaries of their Allotment Plots, the Allotment
Association shall adjudicate and settle the dispute at its own discretion.
6.3 Where there is a dispute between Tenants as to the allocation of land per Allotment Plot, the Allotment
Association shall consult with the affected Tenants to determine whether changes to Allotment Plot
boundaries are required.  Any decision made by the Allotment Association is final and Tenants must
comply with this decision.
6.4 Individuals added to a Joint Tenancy will be eligible to take over full tenancy only if the start date of
their Allotment Tenancy is prior to the application date of existing waiting list applicants for the site.
7 CULTIVATION OF ALLOTMENTS
7.1 An Allotment Plot shall be used wholly or mainly for the cultivation of vegetables, herbs, flowers or
fruit. 
7.2 Excluding permitted buildings, structures and paths at least 75% of the Allotment Plot must be
cultivated to the satisfaction of the Allotment Association. 
Page 157

Page 158

8
62364113v5 
7.3 For new Tenants, a minimum of 25% of the Allotment Plot requires to be cultivated within three months
(excluding the winter period) and 75% of the Allotment Plot cultivated within 12 months, all to the
satisfaction of the Allotment Association. 
7.4 The Allotment Association may assess the condition of an Allotment Plot at the start of the tenancy
and any adjustment to the time frames specified at 7.3 will be at the sole discretion of the Allotment
Association. 
7.5 Tenants will demonstrate good management practices on their Allotment Plot at least to the standard
outlined in the Allotment Site Rules by ensuring: 
7.5.1 That weed growth is controlled and must ensure that weeds do not spread to neighbouring
Allotment Plots.
7.5.2 The use of pesticides and insectisides is limited to those which have been previously
approved by the Allotment Association.  
7.5.3 Control of pernicious weeds, such as those that spread through the extension of rhizomes
(e.g. couch grass and ground elder) or through the production of unwanted plants from
growing tips in contact with the soil (e.g. brambles). 
7.5.4 Removal of uncontrolled vegetation or detritus that is likely to harbour slugs and snails
which may forage into a neighbouring Allotment Plot. 
7.5.5 Invasive vegetation must be controlled to ensure those plants do not encroach on a
neighbouring Allotment Plot, or communal paths. 
7.5.6 Invasive non-native plant species are not allowed to be grown and if found, will require to
be controlled by the Tenant in accordance with relevant legislation from time to time
including the Wildlife and Countryside Act 1981 and the Environmental Protection Act
1990, and any direction of the Council. 
7.6 The Allotment Association encourages Tenants to improve biodiversity within their Allotment Plot. 
7.7 The Allotment Association encourages Tenants to follow organic gardening methods. Tenants shall
be responsible for ensuring that appropriate pest and disease control is carried out on their Allotment
Plot. If Tenants choose to use pesticides or herbicides, then they should use products which avoid
impacts to health and wildlife. Tenants must adhere to the manufacturer’s product label if using
pesticides or herbicides. Spraying equipment and products must be stored in an enclosed locked unit
and must not be left unattended when not in the locked unit.
Page 158

Page 159

9
62364113v5 
8 SALE OF SURPLUS PRODUCE
Tenants may sell produce grown by them on the Allotment Plot. Produce shall not be sold or advertised
for sale within the Allotment Site. Any proceeds or income generated from the sale of such produce
may only be used for social enterprise or community advancement and not for the purposes of making
a profit, trade or business.
9 MAINTENANCE OF ALLOTMENT PLOTS
9.1 The Allotment Plot, including any structures thereon, must be kept in good condition to the satisfaction
of the Allotment Association. In considering whether the Allotment Plot is in good condition the
Allotment Association shall have regard to any weeds, detritus or dilapidated buildings or structures
on the Allotment Plot and the level of cultivation.
9.2 When considering whether an Allotment Plot is in good condition, the Allotment Association shall have
regard to any impact that a lack of maintenance of the Allotment Plot could have on neighbouring
Allotment Plots.
9.3 Damaged and surplus allotment items must be removed from the Allotment Plot and Allotment Site by
the Tenant. 
9.4 All waste material arising on site is the responsibility of the Tenant and should be composted where
possible. 
9.4.1 All other non-compostable waste material e.g. wood, corrugated iron, stones, glass, tyres
and plastics in all forms must be removed and disposed of at a licenced recycling facility
or through the Tenant’s own waste collection. 
9.4.2 Tenants must not leave green waste or dispose of anything (including green waste) on any
other Allotment Plot, or any other part of the Allotment Site. 
9.5 Allotment Plots must be left in an acceptable condition for the next Tenant. If costs are incurred in
bringing an Allotment Plot up to an acceptable condition, the Allotment Association may decide to
recover these costs from the previous Tenant.
10 MAINTENANCE OF ALLOTMENT SITES
10.1 Tenants shall be responsible for keeping boundaries, paths adjacent to their Allotment Plot and paths
between Allotment Plots in a clean and tidy condition and free from obstructions. Where a path is
adjacent to two or more Allotment Plots the respective Tenants shall share responsibility. Should
dispute between Tenants arise in this regard, the Allotment Association shall direct the Tenants as to
how maintenance is to be carried out. This excludes Allotment Site boundary fences.
Page 159

Page 160

10
62364113v5 
10.2 Tenants shall not block or obstruct the access to the Allotment Site, nor any of the access paths and
roads within the Allotment Site.
10.3 Any keys to the Allotment Site remain the property of the Allotment Association and are issued to the
Tenant strictly for the purposes of access to the Allotment Site and are not transferable to any other
person. Keys should not be copied as they will damage locks. Replacement keys can be arranged
through the Allotment Association.
11 SHEDS, GLASSHOUSES AND POLYTUNNELS
11.1 The erection of any sheds, glasshouses or polytunnels on an Allotment Plot must have the prior
consent of the Allotment Association.
11.2 Regarding the measurements of sheds, glasshouses and polytunnels on Allotment Plot;
11.2.1 a shed for storage shall not exceed width 2.5m x length 3m x height 2.5m;
11.2.2 a glasshouse shall not exceed width 2m x length 3m x height 2.4m; and
11.2.3 a polytunnel shall not exceed width 3m x length 10m x height 2.5m .
11.3 The erection of any building or structure must be in accordance with planning legislation/aesthetic
guideline and any materials used must be of suitable durability, in that they must be of a standard that
would last at least five years and be consistent with the traditional aesthetic of the other structures on
the Allotment Site. All structures must be maintained in a good and safe condition to the satisfaction
of the Allotment Association. Any modification to an existing building or structure, other than as part of
a regular repair, shall require the prior written consent of the Allotment Association.
11.4 Tenants are solely responsible for the safety and maintenance of any structure, including boundary
fences, on their Allotment Plot with the clear exception of Allotment Site perimeter fencing.
12 MICRO ALLOTMENTS 
12.1 As Micro Allotments are for temporary use, the following are not permitted: garden sheds, polytunnels
and greenhouses; trees and shrubs; permanent pathways; carpets; machinery left on site; fences
(unless appropriately authorised by the Allotment Association). 
12.2 The following will be permitted on a Micro Allotment: compost area not exceeding approximately 1
cubic metre; and a garden storage unit up to 1.5m wide x 1m deep x 1m high.
13 ACCESS BY PERSONS (OTHER THAN TENANTS) AND DOMESTIC ANIMALS
13.1 Tenants shall be responsible for ensuring that any visitor whom they allow to visit the Allotment Site
complies with these Regulations and the Allotment Site Rules. Failure of visitors to comply may result
in the Tenant being in breach of these Regulations.
Page 160

Page 161

11
62364113v5 
13.2 Dogs and other pets may be brought on to the Allotment Site but must be kept under close control and
not be allowed to enter any Allotment Plot without the permission of the relevant Tenant.
13.3 Any Tenant who brings or allows a pet onto the Allotment Site shall ensure that any fouling is bagged
and disposed of promptly and properly. 
13.4 Pets that become a nuisance or annoyance or cause a disturbance to other Tenants should be
removed from the Allotment Site.
13.5 Tenants shall not kennel dogs or other animals overnight on the Allotment Plot.
14 THE KEEPING OF LIVESTOCK
14.1 Tenants shall not keep livestock including poultry and other birds on the Allotment Plot.
14.2 The keeping of bees shall not be permitted other than with the consent of the Council. Any Council
consent may be subject to conditions. 
14.3 The keeping of Bees will be considered, however, numbers will be limited per site, and is at the sole
discretion of the Council. The keeping of bees will be subject to a separate agreement covering, but
not limited to, the following requirements of the Beekeeper: 
14.4 A Beekeeper must demonstrate that they have sufficient experience as determined by the Council
14.5 The Beekeeper must comply with the Risk Assessment carried out by the Council.
14.6 The Council  will implement spots checks to ensure compliance of the Risk Assessment and consider
any alterations required to the assessment. 
14.7 A Beekeeper must have Public Liability Insurance of £5 million which can be obtained through
membership of the Scottish Beekeeper’s Association. A Beekeeper must maintain insurance cover
and provide proof of the insurance cover to the Council.
15 ACCEPTABLE USE
15.1 The following conditions apply to all Allotment Plots and Tenants: 
15.1.1 Barbed Wire: Tenants shall not have or use barbed wire on the Allotment Plot;
15.1.2 Bonfires: Tenants shall not burn any material on the Allotment Plot or the Allotment Site
unless it is organic material arisings from the Allotment Plot and the material cannot be
composted. Bonfires must never be left unattended. Tenants must give due consideration
to other Tenants and neighbouring properties when choosing when and where to have a
bonfire in accordance with local site rules and where relevant any rules applying to
Page 161

Page 162

12
62364113v5 
neighbouring properties and the bonfire must not compromise or cause nuisance to other
Allotment Plot Tenants or neighbouring properties. Bonfires are only permitted between 1
October to the 30 April.  Allotment Site Rules will apply and may further restrict the use of
bonfires at other times.  
Prior to burning material, Tenants must notify the Allotment Association and the Fire
Service. The Allotment Association must be notified by email with the details of the bonfire
including the name of the Tenant responsible, contact details, date when burning taking
place, Allotment Site and Allotment Plot number or location. 
The Allotment Association reserves the right to suspend or ban bonfires on individual
Allotment Sites if, in the opinion of the Allotment Association, the Allotment Association
has received reasonable and justifiable complaints regarding burning on the Allotment Site.
15.1.3 Compost bins: Where there is no Allotment Site Rules for compost bins all compost bins
must be to the satisfaction of the Allotment Association. Materials composted should be
green waste grown on the site only and should not attract vermin.  
15.1.4 Fences & Hedges: Tenants shall not erect fences or plant hedges on the Allotment Plot
other than for the protection of crops. All fences and hedges must be in keeping with the
traditional aesthetic of the Allotment Site and must be to the satisfaction of the Allotment
Association. Hedges must be maintained to a maximum height of 1.2  metres and not
cause any issue with a neighbouring Allotment Plot Tenant. Willow or elder hedging are
not permitted.
15.1.5 Fruit cages: Tenants must ensure that fruit cages are kept in a safe condition and must
be to the satisfaction of the Allotment Association. Fruit cage areas cannot exceed 25m2
unless permission from the Allotment Association has been obtained and they should not
trap birds.
15.1.6 Sheds: On sites with an Allotment Association installed shed Tenants must regularly
maintain this shed and treat it with water-based preservative (non-toxic) in green, black,
brown, or cedar. The Allotment Association accepts no responsibility for the maintenance
or replacement of any such sheds.
15.1.7 Nuisance: Within the Allotment Site, the Tenants and any invited guest(s) shall behave in
an appropriate manner and shall always be considerate to other Tenants. Tenants and
guests must not do anything or cause anything to be done which is or may become a
nuisance or annoyance or cause a disturbance to any other Tenants. A Tenant is
responsible for the behaviour of their guest(s).
15.1.8 Pathways: Tenants shall not block or obstruct the access to the Allotment Site, nor any of
the access paths within the Allotment Site.
Page 162

Page 163

13
62364113v5 
15.1.9 Material: A Tenant must not allow their Allotment Plot to be used for the storage of
including glass, timber, refuse or any other material deemed unsuitable by the Allotment
Association.  Any material deemed unsuitable shall be removed immediately at the request
of the Allotment Association.
15.1.10 Trees: No new trees other than fruit trees on shall be cultivated or allowed to grow on the
Allotment Plot. New fruit trees shall be cultivated on dwarf stock only. Fruit trees must be
maintained within the Allotment Plot and shall not grow into or cause shade to be cast on
neighbouring Allotment Plots. Upon request by the Allotment Association, the Tenant must
remove any fruit trees that are not maintained in accordance with this clause at the
Tenant’s own expense.
15.1.11 Water: Allotment Site water supplies must be used only for the upkeep of the Allotment
Plot. The Tenant should use water responsibly, and where possible, take measures to
conserve water.  Water taps are for the use of all Tenants equally and no permanent hose
connections supplying an individual Allotment Plot should be attached to a tap.
15.1.12 Flags, flag poles, signage, advertising banners: Tenants shall not erect any flags,
signage, flag poles or advertising banners within their Allotment Plot or any communal area
without prior permission from the Allotment Association.
15.2 Play structures such as trampolines are not permitted within the Allotment Site.
15.3 The use of asbestos sheeting or any asbestos based material is prohibited. The discovery of such
material must be reported to the Allotment Association. The Allotment Association will report any
discovery of asbestos based material to the Council as soon as reasonably practicable.
15.4 Ponds are not permitted unless written permission is given by the Allotment Association. The suitability
of the site and safety aspects will be contributory factors in making that decision. The Tenant will
require to provide a detailed plan of the pond prior to approval given. Where ponds are permitted,
children must be supervised at all times and warning signs must be displayed in prominent positions.
15.5 Tenants must also have regard to any Allotment Site Rules that pertain to the relevant Allotment Site.
16 INSPECTIONS
16.1 The Allotment Association shall be entitled to inspect any Allotment Plot at any time without notice.
Tenants will require to provide the Allotment Association unhindered access to carry out inspects. 
16.2 The Allotment Association may carry out general inspections/audits of allotments as often as it deems
reasonably necessary which includes identifying unworked Allotment Plots i.e. not being cultivated as
per the Regulations. 
Page 163

Page 164

14
62364113v5 
16.3 Tenants must ensure that their Allotment Plot is clearly marked with the designated Allotment Plot
number and visible to the Allotment Association’s inspector/auditor. 
17 ENFORCEMENT
17.1 Where a Tenant is consistently fails to meet the required standards and is in breach of these
Regulations, the Allotment Association may, issue an enforcement letter to the Tenant, setting out the
reasons for the breach (the “Enforcement Letter”).
17.2 The Tenant must, within the Relevant Period of receiving an Enforcement Letter, either:
17.2.1 rectify the breach to the satisfaction of the Allotment Association; or
17.2.2 provide an explanation of any Relevant Circumstances that justify the breach to the
satisfaction of the Allotment Association.
17.3 If, at the end of the Relevant Period, the Tenant has not either:
17.3.1 rectified the breach to the satisfaction of the Allotment Association; or
17.3.2 provided a suitable explanation of Relevant Circumstances to the satisfaction of the
Allotment Association.
the Allotment Association may issue a Final Warning Letter in accordance with regulation 18 of these
Regulations.
17.4 If a Tenant has received two Enforcement Letters within a 12-month period, and the Allotment
Association intends to issue a third Enforcement Letter within that 12-month period, the Allotment
Association shall instead issue a Final Warning Letter in accordance with regulation 18 of these
Regulations.
17.5 Any information communicated to the Allotment Association to support a claim of Relevant
Circumstances shall be dealt with confidentially and in accordance with applicable data protection
legislation.
18 TERMINATION
18.1 One month prior to issuing a notice of termination of a Lease, the Allotment Association shall write to
the Tenant, informing them that the Allotment Association is proposing to give notice of termination
(the “Final Warning Letter”), which shall include:
18.1.1 the reasons for this proposal to issue a Final Warning Letter; and
18.1.2 where appropriate, the reasons for rejection by the Allotment Association of any previous
explanation of Relevant Circumstances provided by the Tenant.
Page 164

Page 165

15
62364113v5 
18.2 The Tenant shall then have the opportunity to make representations in writing to the Allotment
Association in relation to the Final Warning Letter, including an explanation of any Relevant
Circumstances that justifies any failure to rectify the breach, which the Allotment Association shall take
account of in making any decision. Such representations must be submitted to the Allotment
Association within 28 days of the date of the Final Warning Letter.
18.3 If at the end of 28 days following the issue of the Final Warning Letter, either:
18.3.1 the Tenant has rectified the breach to the satisfaction of the Allotment Association; or
18.3.2 following consideration of the Tenant’s representations, including any Relevant
Circumstances, the Allotment Association no longer proposes that the Allotment Tenancy
shall be terminated;
the Allotment Association shall write to the Tenant informing them of this.
18.4 If at the end of 28 days following the issue of the Final Warning Letter, either:
18.4.1 the breach has not been rectified to the satisfaction of the Allotment Association; or
18.4.2 the Tenant has not provided an explanation of any Relevant Circumstances to the
satisfaction of the Allotment Association;
the Tenant shall be in breach of the Regulations and the Allotment Association may terminate the
Allotment Tenancy of whole or part of the Allotment Plot by giving written notice in the form of a letter
(the “Termination Letter”).
The Termination Letter shall state the Termination Date, which shall be a date no less than one month
from the date of the Termination Letter, and the reasons for termination.
18.5 Upon the termination of the Allotment Tenancy, the Tenant shall remove, unless otherwise agreed
with the Allotment Association, all buildings and/or structures on the Allotment Plot. Where the Tenant
has not returned the Allotment Plot to a lettable condition, in the reasonable opinion of the Allotment
Association, the Allotment Association will advise the Tenant of the cost of this work and may carry
out the works and recover from the Tenant any expenses reasonably incurred by the Allotment
Association in so doing. Any buildings, structures or equipment left on an Allotment Plot will become
the property of the Allotment Association and may thereafter be offered to the next Tenant.
18.6 Each Tenant is responsible for returning the keys to the Allotment Site to the Allotment Association at
the end of their tenancy.
18.7 A Tenant can terminate their Allotment Tenancy at any time by giving 14 days prior written notice,
however no refund of rent already paid will be made.
Page 165

Page 166

16
62364113v5 
18.8 In the event of any dispute regarding the interpretation and application of these Regulations, the matter
shall be referred to such of the Council's Officers, or such other person, as may be nominated for this
purpose from time to time.  The Council shall have regard to the 2015 Act and any regulations and
guidance made under it in arriving at its decision. 
19 EXTREME CIRCUMSTANCES
19.1 If a Tenant behaves in a manner which causes fear, alarm or severe disruption to any person, the
Tenant shall be issued with a Final Warning Letter, and access to the Allotment Site may be
suspended.
20 LIABILITY FOR LOSS OR DAMAGE TO PROPERTY
20.1 The Tenant shall be responsible for the safekeeping of any objects or materials (including tools,
machinery, equipment, goods, plants, fertilisers and compost) which the Tenant keeps or brings on to
the Allotment Site. The Allotment Association shall not be liable for the loss of, or damage to any such
objects or materials, howsoever caused.
21 CONTACT DETAILS
21.1 contact details below should be used to contact the Allotment Association regarding these Regulations
or associated allotment issues:- 
Allotment Association address, email address and telephone contact.
Page 166

Page 167

0
Allotment Policy 2022| Moray Council 
Appendix 2 
Moray Council
Allotment Policy 
1. Introduction 
1.1   Allotments can provide the people of Moray with a number of benefits and
can contribute to a number of objectives of Moray Council and its partners. 
They can produce good quality food which will contribute to food security
planning; reduced carbon emission associated with importing foodstuffs
and help meet the Climate Change challenge.  They provide a healthy
activity benefitting people’s physical and mental wellbeing and the food
produced can encourage healthy eating and help tackle obesity.  They
contribute to the partnership aim of building strong and sustainable
communities by encouraging community engagement, through
opportunities for lifelong learning and developing the capacity of local
communities to contribute and respond to health, food security,
environmental and community issues.   
1.2 The Community Empowerment (Scotland) Act 2015 Act updates and
simplifies legislation on allotments and allotment sites and places certain
duties upon local authorities.  These include the requirement to maintain
waiting lists, take reasonable steps to provide allotments if the waiting lists
exceed certain trigger points and develop allotment site regulations.   
Item 12.
Page 167

Page 168

1
Allotment Policy 2022| Moray Council 
1.3   The meaning of ‘allotment’ and ‘allotment site’ are defined within the act
as; 
Allotment means land that – 
Is owned or leased by the local authority
Is leased or intended for lease by a person from the authority, 
AND 
Is used or intended for use –
Wholly or mainly for the cultivation of vegetables, fruit, herbs or flowers,
AND
Otherwise than with a view to making a profit 
Allotment site means land that – 
Consists wholly or partly of allotments, AND 
Land owned or leased by a local authority that may be used by tenants of
allotments in their use of allotments 
Community Management Group – 
A group who represents the interests of all or the majority of the tenants
of the allotments on a particular site. The 2015 Act sets out the
management functions that are permitted to be delegated to an individual
or group. 
2.      Policy Statement 
2.1   This policy is to provide guidance and principles that will allow the Council
to work with all stakeholders to identify and develop allotment sites. It also
provides information on responsibilities and guidance to support
partnership working between Moray Council, voluntary sector agencies,
Community Management Groups, and other stakeholders in managing
allotment provision. 
3.      Policy Objectives 
3.1 The Council will work with voluntary sector agencies, Community
Management Groups, individuals and statutory organisations to deliver
allotments which are:
• Community led through Community Management Groups;
• Valued and valuable local green spaces, which protect and enhance
the environment and promote improved biodiversity;
• Providing amenity;
• Easily accessible for all;
Page 168

Page 169

2
Allotment Policy 2022| Moray Council 
• Well maintained;
• Well used, with a high rate of occupancy;
• Fit for purpose, with appropriate facilities; 
• Managed consistently and well, in collaboration with empowered
community groups;
• Economically sustainable 
4. Policy 
4.1 Waiting Lists 
4.1.1 The Council will disseminate, and also display on the Council’s website,
information about all current allotment sites within Moray, including leased
and privately managed sites. 
4.1.2 Where allotment sites aren’t currently available the Council has a duty to
establish and maintain a waiting list of residents who have requested an
allotment.  The Waiting List will be recorded on a community-by-community
basis. 
4.1.3 Individuals who wish to have their name added to their local waiting list will
complete an Allotment Application form, which will be available to download
on the Moray Council website (or by hard copy available on request from
the Moray Council Contact Centre), and submit it to the council. Once
received it will be held on the relevant “Waiting List”. Requests for
allotments will only be accepted from persons over the age of 18 who are
resident in Moray. 
The Waiting List will include 
• The name and contact details of the person making the  
request 
• Any special requirements;
• The size of allotment requested, if specified but no more than 
250 square metres (full plot size). 
• Information about the distance of the person from nearby 
allotment sites;
And
• The date on which the person was added to the list. 
4.1.4 The Council will publish details of length of waiting lists on a community
basis. 
4.1.5 Details of people on a waiting list held by a Community Management Group
MUST be shared with Moray Council to enable the Council to meet the
requirements set out in the Community Empowerment Act for managing
waiting lists and providing sufficient space for allotments. 
Page 169

Page 170

3
Allotment Policy 2022| Moray Council 
4.2 Allotment Provision 
The Community Empowerment (Scotland) Act 2015 Act, under Section 112,
requires that once the waiting list within a particular community reaches 15
applicant, the Council takes reasonable steps to provide allotments including,
but not limited to:
• Analysing demand
• Disseminating information
• Developing partnership working
• Identifying all land in the area that is suitable for growing
• Ensuring there is sufficient suitable land to satisfy future demand
• Understanding individual needs of those on the waiting list 
4.2        Analysing Demand 
4.2.1 The Council will consult with a wide range of stakeholders when carrying
out an analysis of demand for allotments within a community and use on-
line consultations and other methods to obtain the views of local residents. 
The analysis should identify local residents’ needs in terms of the growing
space that they need and want, and where that demand is located. 
4.3         Disseminating information 
4.3.1   The Council will advise communities once a waiting list has reached 15
applicants and clearly communicate next steps for that community. 
4.4     Developing Partnership Working 
4.4.1 Services across Moray Council will work together and with voluntary
sector agencies, Community Management Groups, individuals, and other
stakeholders in the design and delivery of new allotment sites. 
4.4.2 The Council will work with partners to identify and support the
establishment of Community Management Groups. Where these groups
are suitable and willing they can apply to have management
responsibilities for allotment sites delegated. 
4.4.3 In order to be considered suitable a Community Management Group must:
a) Have a suitable constitution; 
b) Be able to show it is representative of at least a majority of
tenants/residents;
c) Show an understanding of the regulations relating to the management
of allotment sites in Moray. 
Page 170

Page 171

4
Allotment Policy 2022| Moray Council 
4.5 Identifying all land in the area that is suitable for growing 
4.5.1   The Community Empowerment (Scotland) Act 2015 requires each local
authority to prepare a food growing strategy.
4.5.2  The Moray Food Growing Strategy   aims to ensure there are more
opportunities for people who would like to grow their own food to do so. A
variety of different community food growing spaces including allotments
have been identified in towns and villages across Moray. 
4.5.3 The Council will engage with communities, Council Services and other
stakeholders to identify potential allotment sites within Moray. 
4.5.4 Where Council-owned land has been identified by the Council for
provision of allotments, and a Community Management Group is
available, the Council will ensure the land is accessible and serviceable
and lease the land to the Community Management Group who will be
responsible for developing and managing the allotments. 
4.5.5 The Council will support Community Management Groups by obtaining
planning permission for identified allotment sites.   
4.5.6 The Council will work with partners to support Community Management
Groups to develop allotment sites by signposting resources and sharing
best practice. 
4.6 Ensuring there is sufficient suitable land to satisfy future demand 
4.6.1 Where there is an unmet demand for allotments and there is no suitable
Council owned land available, the Council will work with partners to
approach private landowners to discuss options for making additional land
available for allotments provision and support Community Management
Groups to agree lease arrangements with the relevant landowner. 
4.6.2 If there is sufficient demand but no current Community Management
Group then the council should consider direct provision, with ongoing
capacity building support provided to the allotment users to develop into a
management group, at which point the council can lease to the
Community Management Group. 
4.7  Understanding individual needs of those on the waiting list 
4.7.1 The Council will work with partners to offer allotments of the size
requested as reasonably close to a person’s place of residence as
possible (where possible within a 3 mile radius of the person’s residence
or within a 20 minute journey on public transport). 
4.7.2 If the closest available size of allotment to that which was requested is
offered and rejected, the person shall remain on the list until an allotment
of the size requested is offered and accepted.
Page 171

Page 172

5
Allotment Policy 2022| Moray Council 
4.7.3   To ensure those on the list have the best chance of obtaining the size of
allotment requested, the Council will signpost individuals to private sites
in the area, and remove the individual from the waiting list if they
subsequently accept such an alternative arrangement and formally
withdraw their request for an allotment from the local authority. 
5.   Lease Arrangements 
5.1     Leases between the Council and Community Management Groups will
take into consideration the relevant provisions of the Community
Empowerment Act. 
6.  Allotment Site Regulations 
6.1 The Council will make allotment site regulations which provide for all  
allotments within the local authority area, which may include different
provisions for different areas or allotment sites. The Council will consult
widely with a wide range of stakeholders (e.g. allotment holders and
persons on the waiting list) and take their views into consideration when
preparing regulations. 
7.    Delegation of Management of sites 
7.1  Where a site is leased by a Community Management Group they have the
right to request delegation of management functions (to the extent of the
functions listed in section 123(3) of the Community Empowerment Act.
Delegation of functions is not a substitute for local authority duties
regarding the management of allotment sites and waiting lists, and the
setting or regulations. 
7.1.1  In this instance management functions relates to all actions
regarding the management of allotment sites. 
7.1.2  Requests must be made in writing (or email) and must include both
the name and address of the person(s) making the request and any
other information necessary to handle the request. 
7.1.3 Once a request is made the Council will respond with its decision
within 28 days of the initial request, unless further information is
required. 
7.1.4  Where the Council requires further information this will be made no
more than 14 days after the date of the initial request.
Page 172

Page 173

6
Allotment Policy 2022| Moray Council 
7.1.5  Where there has been a request for additional information the
Council will take no more than 56 days from the initial application
to determine the outcome of the request. 
7.1.6  If a request is approved then an agreement will be created in
collaboration with the group making the request as to which duties
will be delegated and when that delegation will be reviewed. 
7.1.7  Where a request is refused the group will be informed as to the
reasons why. 
7.1.8 Where a subsequent request is made following a refusal the group
is expected to outline any actions that have been taken to address
the reasons for the initial refusal. 
7.1.9 The Council will monitor the operation of delegated functions. Any
material disagreement between the local authority and Community
Management Group will be dealt with under the Councils existing
complaints procedure. 
7.1.10 The Council has the power to revoke delegated functions where it
reasonably believes that they are not being carried out
satisfactorily. 
7.2   At the entrance to each allotment site a full list of all regulations relating to the
allotment site will be  displayed. 
8.      Use of Council and other premises for meetings 
8.1    A Community Management Group may request use, free of charge, of a
Council premises, or a premises run on the Council’s behalf, for the
purposes of holding a meeting of the tenants of allotments on the site
about the site. 
8.2    The request must be made in writing, contain contact information and
details of the proposed meeting and be made at least one month before
the date on which the meeting is proposed to take place. 
8.3    The Council must within 14 days of receiving the request
▪ Grant the request
▪ Offer the person an alternative date, time or location for the proposed
meeting, or
Page 173

Page 174

7
Allotment Policy 2022| Moray Council 
▪ Refuse the request. 
9.      Disposal of Allotment Sites Owned by the Council 
9.1   The Council may not dispose of, or change the use of, the whole or part
of an allotment site without the written consent of the Scottish Ministers. 
Any transfer of ownership of whole or part of an allotment site without the
consent of the Scottish Ministers will be of no effect. 
9.2 The Council must offer the tenant of the affected allotment(s) a lease of
another allotment of an area the same as or similar to that of the tenant’s
allotment on the same allotment site or within a reasonable distance of the
allotment site, if practical and necessary.   
10.    Termination of lease of allotment or allotment site 
10.1  The Council may terminate the lease of the whole or part of the allotment
or allotment site on a specified date but only if; 
10.1.1  The tenant of the allotment or the allotment site has been given one
month’s notice of termination in writing where there has been a breach of
allotment site regulations by the tenant. 
Or 
10.1.2 The tenant of the allotment or the allotment site has been given notice of
termination in writing at least one year before the specified date if the
Scottish Ministers have consented to the disposal or change of use of the
allotment site or the renunciation by the Council of lease of the site. 
11.   Resumption of allotment or allotment site by local authority  
11.1 Where a Community Management Group or other group of individuals
leases an allotment or an allotment site from the Council, the Council may
resume possession of the whole or part of the allotment or the allotment
site only if 
(i) The resumption is required for building, mining or any other industrial
purpose or for the construction, maintenance or repair of any roads of
sewers necessary in connection with any such purpose 
And 
(ii) The Council has given the required notice  in writing at least three
months before the date on which the resumption is to take place and
it specifies that date 
And 
Page 174

Page 175

8
Allotment Policy 2022| Moray Council 
(iii) The Scottish Ministers have consented to the notice 
11.2 The Council must offer the tenant of the affected allotment(s) a lease of
another allotment of an area the same as or similar to that of the tenant’s
allotment on the same allotment site or within a reasonable distance of the
allotment site, if practical and necessary. 
12.   Annual Allotments Report 
12.1 By the 30th June each year, an annual report will be prepared covering; 
For each allotment site-
• Location, size, and number of allotments 
• Number of persons on waiting list as of last day of reporting year
• Number of persons waiting more than 5 years on list 
Where the list is more than 15 or more than one person has been on list
for more than 5 years-
• Any reasonable steps being taken to address the need of these
person(s)
• Reasons why the duty to provide has not been met 
General-
• Number of persons added/remove from lists
• Any other reasonable and relevant information relating to the
performance of allotment sites 
12.2 The report will be published on the Council’s website. 
13 Allotment Requests - Tasks and Responsibilities
Supporting the development of allotments requires work across several
Council services.  These are outlined in the table below. 
Task  Responsibility Lead
Officer 
1 Point of contact for enquiries – through
dedicated e-mail address 
Communities
Service 
2 Updating allotments page on Council
website 
Communities
Service 
3 Management of waiting list  Communities
Service 
Page 175

Page 176

9
Allotment Policy 2022| Moray Council 
4 Capacity building support for Community
Management Groups to become
established
Communities
Service 
5 Identification of land suitable for
allotments
Economic
Growth &
Development 
6 Provision of technical information on
specific sites (access, utilities, basic
infrastructure)
Economic
Growth &
Development 
7 Preparation and submission of planning
application
Economic
Growth &
Development 
8 Undertaking works to ensure allotment
site is accessible and serviceable
Housing &
Property
Services 
9 Drawing up of lease Housing &
Property
Services 
10 Development of Allotment Site
Regulations
Housing &
Property
Services 
11a Annual report 
Information on waiting lists and actions
taken to meet need.
Communities
Service 
11b Annual Report 
information on current sites and
occupation levels
Economic
Growth &
Development 
11c Annual Report – information on all
available sites on website
Economic
Growth &
Development 
If the trigger number on the list is
reached and a community
management group cannot be
established to develop and  manage
the site then there will be additional
tasks to set up a site and manage the
allotments on an ongoing basis  
a Identifying suitable sites for allotments Economic
Growth &
Development 
b Securing sites for allotments Housing &
Property
Services 
c Developing sites to create allotments Housing and
Property
Services 
d Setting of fees for allotment holders Environmental &
Commercial
Services 
Page 176

Page 177

10
Allotment Policy 2022| Moray Council 
e Administration work to collect annual fees
for sites
Environmental &
Commercial
Services 
f Inspection of sites Environmental &
Commercial
Services 
g Capacity building support for allotment
management groups to become
established
Communities
Service 
Page 177

Page 178

Page 178

Page 179

REPORT TO: CORPORATE COMMITTEE ON 29 AUGUST 2023 
SUBJECT: ARMED FORCES COVENANT UPDATE 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 The report provides an update to Committee on the progress made in
supporting the armed forces community in Moray through the Armed Forces
Covenant 
1.2 This report is submitted to Committee in terms of Section III (B) 41 of the
Council's Scheme of Administration relating to formulation and review Council
wide policy, strategies, priorities and objectives in relation to cross cutting
issues. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee: 
(i) Note the progress being made in delivering on the Armed Forces
Covenant; and 
(ii) Acknowledge the significant achievement in Moray Council
receiving the Ministry of Defence Gold Employer Recognition
status. 
3. BACKGROUND 
3.1 Moray Council is a signatory to the Armed Forces Covenant which is ‘a
promise by the nation ensuring that those who serve or who have served in
the armed forces, and their families, are treated fairly.’ Moray Council
reaffirmed its support for the Armed Forces at Full Council on 29 June 2022
(Paragraph 8 of the minute refers) and requested an update on how the
Council can ‘support our serving and veteran community across the full range
of services we provide and strengthen partnerships with the Armed Forces
community’.  
Item 13.
Page 179

Page 180

3.2 The Armed Forces Act 2021 introduced a new requirement for some public
bodies, including the NHS and local authorities, to pay due regard to the
principles of the Covenant when carrying out specific public functions in the
areas of education, housing and healthcare. In Scotland these duties sit
with the local authority for housing and education and the Integration Joint
Board (IJB)/Health Board in relation to healthcare. 
3.3 Moray Council has an elected member Armed Forces Champion who chairs
the Armed Forces Covenant Group which reconvened in October 2021. The
group meets twice yearly and brings together council and partner services
along with representatives from 39 Engineer Regiment, Kinloss and RAF
Lossiemouth. The group updated their Terms of Reference in November 2022
to take account of the 2021 Act. 
3.4 There are currently two focussed working groups one for Education, and one
for Childcare – with a regular update on Health from the NHS Armed Forces
Champion. NHS Education Scotland have committed to supporting the Military
Access Programme which aims to recruit individuals from the armed forces
community to the NHS. Communications will be going out to public sector
armed forces champions to make them aware of this. 
3.5 It is anticipated that Housing will be represented on future groups and will be
able to share information around how they are responding to the Covenant –
for instance in the refreshed Allocations Policy which is under development. 
3.6 An Education sub-group has been brought together for head teachers from
schools with a high level of military pupils. These schools have been working
to share good practice and have submitted collective funding bids to draw
down Armed Forces Covenant funds. Most recently, the schools were
awarded £90k for a new project which will largely pay for Pupil Support
Workers for the academic year 23-24 in five schools. 
3.7 Education colleagues have made progress with the Dandelion Project which
will offer support to military families relocating to Moray. The Education
Children’s and Leisure Services Committee  approved the approach which will
see a new support officer in place in Education to offer direct support to
families as they relocate to Moray (Paragraph 18 of the minute refers). 
Military partners noted how timely this was with the projected increase in
families coming to Moray. The approach will be to focus on Forres and
Lossiemouth Associated School Group (ASG) areas first before looking to roll
out across Moray 
3.8 Childcare is an issue which has been consistently highlighted by military
partners – with the RAF citing the lack of wraparound childcare provision as
an operational risk in terms of staff relocation and availability. There is no
statutory expectation to provide wraparound childcare which falls outwith the
statutory requirements upon the Council for Early Learning Childcare (ELC)
and for school education. There are particular challenges for dual serving
families and single serving parents, often due to the lack of a familial support
network. 39 Squadron also noted the younger demographic profile of their
personnel and associated wraparound childcare needs.
Page 180

Page 181

3.9 The childcare challenges in Moray are significant – and a recent survey of
around 1400 parents confirmed that insufficient wraparound childcare
provision was preventing many parents, from both military households and the
wider community, from fulfilling their economic potential.  Moray Economic
Partnership (MEP) have formed a Strategic Working Group to explore the
issue, which includes direct input from military stakeholders to continue to
address this and it will remain as a standing item for the Covenant Group. 
3.10 The Covenant Group have also had strategic input from human resources
(HR) colleagues. The Council has been delivering on an Improvement Plan
(as part of the process of achieving Gold Employer Recognition Status)  which
included military service leavers and veterans Recruitment events in autumn
2022 and spring 2023 There have also been site visits to RAF Lossiemouth
with elected members and staff to continue discussions on how we can work
effectively together. 
3.11 All the work undertaken in support of the Armed Forces Covenant
commitment along with specific work and focus from Human Resource and
Organisational Development colleagues has contributed to Moray Council
receiving Gold Level status in the Defence Employer Recognition Scheme
which acknowledges the embedded good practice in the organisation in
relation to armed forces support. The move to Gold status award demonstrates
that Moray Council recognises the value of service personnel and the Ministry of
Defence Regional Employer Engagement Director, noted: “I am absolutely
delighted that Moray Council have been awarded the Employer Recognition
Scheme Gold award. Their commitment to support local Regular and Reserve
forces and their families is at the centre of the Armed Forces Covenant, and I
look forward to continuing to work with this wonderful organisation to make
Morayshire a desired destination for our Regular forces, Reserve Forces and
Veterans in the future. 
3.12 The council continues to be proactive in promoting information to our
colleagues who are part of the local Armed Forces community, having a
dedicated intranet page on our staff communication platform. This page hosts
content and monthly updates from Army Headquarters (Scotland), Age
Scotland and the Veterans Project providing information on finance, careers &
training, deployment and community initiatives. A recent addition to this page
was a new section created for MOD Sponsored Cadet Forces. 
3.13 HR Policies already support the needs of Armed Forces Reservists. The
Special Leave policy accommodates requests for time off for attending
training camps, mobilisation and/or time to support family due to emergent
needs. The Flexible Working policy accommodates adjustments to the
working environment to balance life and work demands. The provision of
these policies provides support for both the Armed Forces community and 
our wider workforce  
Page 181

Page 182

3.14 The Council is a major employer within Moray and welcomes the opportunity
to demonstrate support publicly to the Armed Forces community. We do this
in supporting Armed Service days and through activities such as flag raising
and attendance at HR events which demonstrates publicly our support to the
wider forces community. In February 2023, awareness raising amongst
service managers was enhanced by a presentation on the RAF Benevolent
Fund to a key operational manager meeting, which will be repeated on at least
an annual basis. 
3.15 Moray and Highland Council have worked together to develop learning
materials to raise awareness of the Armed Forces Covenant amongst front
line staff. These materials are hosted on CLIVE, the Council’s in house
Learning Management System – and are also available to other Community
Planning partners to use.  All new staff will be encouraged to undertake the
Introduction to the Armed Forces training on CLIVE as part of their induction. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP) 
The report is consistent with Corporate Plan intention to create
‘…opportunity for all where people can thrive in vibrant communities and
we work together to enrich our future’ and recognition of ‘the influence of
the MOD on the population and job market’. 
(b) Policy and Legal 
The Council is meeting the requirements of the Armed Forces Act 2021
through the facilitation of the Armed Forces Covenant Group and
associated working groups. 
(c) Financial implications
None 
(d) Risk Implications
None 
(e) Staffing Implications
None other than officer involvement in Covenant Group 
(f) Property
None 
(g) Equalities/Socio Economic Impact
None  
Page 182

Page 183

(h) Climate Change and Biodiversity Impacts 
No climate change or biodiversity implications have been determined in
relation to the council support to the Armed Forces Covenant. 
(i) Consultations 
The Head of Head of Governance, Strategy and Performance; the Chief
Financial Officer; the Head of HR, ICT & OD; the HR Manager; the
Acting Head of Education Resources and Communities; the Head of
Education (Chief Education Officer); the Business Support Team
Manager; Lindsey Robinson, Committee Services Officer and the Equal
Opportunities Officer have all been consulted and are in agreement with
the contents of this report as regards their respective responsibilities 
5. CONCLUSION 
5.1 Committee is to note the progress being made in Moray to meet our
commitment to the Armed Forces Covenant the significant
achievement in Moray Council receiving the Ministry of Defence
Gold Employer Recognition status. 
5.2 The Armed forces Covenant Group, chaired by the elected member
Champion has been successfully re-established and will continue
to be the main forum where council services and partners can
interact with the Armed Forces in Moray.   
Author of Report: Kevin McDermott, Communities (CLD) Service Manager 
Background Papers: 
Ref: SPMAN-9425411-266 
Page 183

Page 184

Page 184

Page 185

REPORT TO: CORPORATE COMMITTEE ON 29 AUGUST 2023 
SUBJECT: ICT AND DIGITAL STRATEGY AND PLAN 2023-2026 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform Committee of the progress made against the current Information
and Communications Technology (ICT) and Digital Strategy and Plan and to
consider the revised Strategy and Plan for the period 2023-2026. 
1.2 This report is submitted to Committee in terms of Section III (B) (34) of the
Council's Scheme of Administration relating to the development and
implementation of information technology policies. 
2. RECOMMENDATION 
2.1 It is recommended that Committee: 
(i) Note the progress made against the 2020-23 ICT Plan (APPENDIX
1);and 
(ii) approve the ICT and Digital Strategy 2023-2026 (APPENDIX 2) 
3. BACKGROUND 
3.1 The Council’s ICT and Digital Strategy and Plan set the direction and work
required to respond to, support and achieve the priorities of the Council. 
3.2 The ICT and Digital Strategy sets out how efficient and effective technology
enables services to meet current and future service requirements in delivering
the Council’s priorities.  The ICT and Digital Plan refers to the business needs
within service departments and ensuring that the Council’s systems and
infrastructure are maintained and fit for purpose.  The plan also helps ensure
the sound management of ICT resources to maximum effect and efficiency.
Item 14.
Page 185

Page 186

3.3 The Strategy recognises the financial constraints within which the Council is
operating, whilst at the same time continuing to enable development of
improvements and modernisation through transformative activities.  This
includes supporting strategic and service priorities while seeking to contribute
towards and enable long term sustainability. 
3.4 Continued development of digital technologies will enhance service delivery
both within and across different services.  This includes, for example, digital
inclusion and participation and seeking improvements in the use of data,
improving the quality of data, more intelligent and automated use of data and
improved skills in this regard.   
3.5 Technological change is fast paced and dynamic.  Keeping up with the rapid
pace of change and requirement for digital developments to be intrinsic in the
delivery of high quality public services brings both opportunities and
challenges.  Adoption of new technologies will be solution oriented, evidence
based, provide value for money and have clearly defined outcomes to ensure
that good decisions are made that enable robust planning allowing the Council
to fully resource, implement and support any new digital investment.   
3.6 To help inform the future vision and direction for digital technology and
innovation within and across services, the Council is progressing through its
first Digital Maturity Assessment, the outcome of which will be used to
contribute towards guiding further developments.  The report from the first
Digital Maturity Assessment will be available from mid-autumn following which
more detailed work will be undertaken to consider the outcomes and translate
those into the action plan for further development. 
3.7 As well as digital development, the ICT Service ensures that the current
infrastructure and systems remain fit for purpose.  The scale of behind the
scenes work this involves is significant and forms a substantial part of the
action plan.  Examples of the type of work this involves are essential system
upgrades, patches and fixes, server and network maintenance, contract
management and support services to both corporate and education network
users. 
3.8 The other most significant area which has seen a much higher profile in recent
years is cyber security and resilience.  Cyber-attacks across a number of
public sector bodies and other organisations have been well publicised.  Other
factors that are seen to raise the potential for increased risks are from
geopolitical developments and the impact of a more dispersed workforce.  The
demands arising from this for the service have grown exponentially and this
remains a critical area of focus for the ICT Service.
Page 186

Page 187

Progress on 2020-2023 Strategy and Plan 
3.9 Progress has been made on the majority of the actions as follows. 
Transformation: 
Increased number of services available digitally to the public - these include
Short Term Lets, Nursery Registration, 2-Year Old Registration.  Now 89
services available online via e-Forms up from 54 in 2020/21, leading to
42,804 digital submissions in 2022/23. Other Services are also available to
the public online e.g. Council Tax, Housing Rent / Points & Positions, Parents
Portal etc. 
Increased number of users of additional online services - see above plus
Table 1 which illustrates the numbers of Councils Website Users, Sessions
and Page Views have all increased between 2020/21 and 2022/23. 
TABLE 1: Total Council web site usage stats for the last 3 years 
Period Users Sessions Page
views
20/05/22 – 29/05/23 1,098,667 1,354,079 1,913,299
29/05/21 – 29/05/22 822,402 1,051,799 1,622,326
29/05/20 – 29/05/21 795,930 969,239 1,597,254 
M365 - developed and implemented. The M365 project is now 71% completed
and a roll out of the core solution is scheduled to take place by the end of
October. 
Roll out of hardware (e.g. laptops / phones) and software (e.g. Microsoft
Teams) to support mobile and flexible working, and taking this work forward
as part of the Smarter Working project.   
When system contracts are being renewed the option of having that system
hosted is considered and a move to the cloud is taken when there is a strong
business case and a suitable risks / benefits return. e.g. Gladstone, M365,
Parents Portal, Public-i. 
Decision Support 
Increased provision of Dashboards and automated reporting, Data Sharing
work with DHI on Patient Personal Data Store, Teams Federation with NHS
and other Councils. 
Compliance 
Accreditation work for both the corporate and education networks,
implementation of an online learning platform to raise security awareness and
to enable regular phishing simulation exercises.
Page 187

Page 188

Forward Planning 
Support for the preparation of an updated ICT strategy for schools. 
3.10 Additional demands have arisen due to a growing demand for digital from
services to drive efficiencies and provide the public with a more streamlined
service. There is also an increased number of upgrades and patches required
on systems to ensure they remain secure. Opportunities from working in
partnership with other Councils and Public bodies (DHI, NHS Federation,
Digital Scotland etc.) are useful but do require an allocation of resource. 
Further additional demands have come from the increase in cyber incidents
and cyber security related work, unplanned work (e.g. replacement of the
corporate anti-virus solution), supporting a much larger proportion of remote
workers as support calls generally take longer, recruitment challenges and
responding to the priorities of other services. 
Proposed ICT and Digital Strategy 2023-2026 – Key Themes 
3.11 The proposed ICT and Digital Strategy continues to build on the progress
made to date and provides a sharper focus on the further development of the
council’s digital maturity through exploration, identification of and
implementation of digital technology across services.   This includes
technology that supports the virtual and collaborative nature of hybrid working,
the use of Artificial Intelligence and Cloud services.  Fundamental to this
developing maturity will be proactive and positive engagement with services
on potential digital developments for both current and new technologies. 
3.12 Developments encompassed within the overall strategy which will carry a high
priority include: 
- Digital Developments - advancing technologies e.g. Artificial Intelligence,
Power Apps, tools for increased collaboration
- Cyber Resilience
- Cloud Computing
- Intelligent Use of Data including further collaboration and shared access 
3.13 Developments within Education are also key to maximising the use of digital
inclusion in learning and teaching that will support improving attainment as
well as providing positive skills and confidence that form a firm foundation for
future employment and other positive destinations for our young people.  
3.14 Demands related to cyber security and resilience have increased following a
number of high-profile cyber-attacks on large public institutions, geo-political
developments and the potential risks associated with increased remote
working.   This is also reflected within the Strategy and Plan. 
3.15    Working collaboratively with partners and developing our approach to
enhanced use of data, including ‘big’ data, analytics and data sharing also
gains prominence in the strategy and plan.   
Page 188

Page 189

3.16 Taking account of the ongoing requirement to ‘keep the lights on’, ensuring
the Council’s ICT systems and infrastructure remain fit for purpose and
compliant with appropriate standards also remains a core part of the proposed
approach. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The contents of this report are in accordance with the priorities set out in
the Corporate Plan and set out how to make best use of technological
resources to support the Council to meet current and future objectives
and challenges. 
(b) Policy and Legal
None. 
(c) Financial implications
There are no immediate financial implications the pace of technological
development is rapid and trends within the technological environment will
be monitored for potential risk and impact e.g. the push from providers to
move to Cloud based services. 
In addition to this, ICT devices and infrastructure as a result of increased
remote working will require to be maintained and replaced potentially at
a faster rate than the previous desktop personal computer estate,
therefore, in the medium term consideration of a revised rolling
programme of maintenance will be required, which will have to be
accommodated in the council’s financial planning. 
(d) Risk Implications
The ICT and Digital Strategy and Plan are based on assessment of the
issues and risks anticipated in relation to the council’s technological
requirements and identify actions to address these. The actions in the
ICT plan have been prioritised and if necessary, activity will be reduced
or ceased on those actions ranked lowest. Given the focus on
transformation through responding to the Best Value Audit Report,
budget related changes, modernisation and improvement it will be
challenging for the ICT service to deliver on all of the work identified and
so there is a risk of slippage that could have an impact on services. Any
issues and proposed remediation will be identified for consideration
CMT-SMT. The requirement for additional ICT support on an ongoing
basis to support the number of mobile devices in use across the council
(140% increase over the course of the pandemic) also remains a
demand which continues to be monitored. 
With reference to links with the ICT and digital developments within
Education, the main objective is to ensure the ICT infrastructure is in a
state of readiness to support further digital developments such as
equitable access and digital learning environments to minimise the risks
of further digital inequity and the consequent impact on learning and
teaching, attainment and achievement.
Page 189

Page 190

(e) Staffing Implications
There are no direct staffing implications arising from this report.
However, it the resources required for the ICT service to deliver the
actions in the ICT will be monitored carefully. 
As the Council continues to respond to the pandemic, seeks to transform
and modernise and prepares its financial plans, it is likely that specific
technological issues will emerge. Account will be taken of the whole
council strategic management of these technological issues as they
emerge by involving the ICT team in the planning of the required
changes. 
(f) Property
None. 
(g) Equalities/Socio Economic Impact
The ICT team continually monitor accessibility standards ensuring the
internal and external websites are compliant. 
(h) Climate Change and Biodiversity Impacts
The ICT service is represented on the Council’s Climate Change Board
and works closely with the Climate Change Team to achieve actions in
the Climate Change Action Plan.  Supporting the move to increased
remote working contributes towards the reduction of carbon emissions
from commuter travel. 
(i) Consultations
CMT-SMT and Service Managers have been consulted on the draft
documents and their views incorporated into the proposals.  The report
has also been circulated to Committee Services and comments
incorporated.   
5. CONCLUSION 
5.1 The ICT Section continues to enable efficient and effective service
delivery and transformation.  While there has been a particular focus on
facilitating mobile and remote working for large numbers of the
workforce more recently, there has also been progress in catching up on
the backlog of work that resulted from the diversion of resources during
from March 2020 through to approximately Autumn 2022 that were
working on pandemic related impacts. 
5.2 The ICT and Digital Strategy and Plan recognise the importance of
making progress with enhanced use of digital technologies whilst
maintaining business as usual systems, infrastructure and security. 
5.3 The Committee is asked to approve the revised ICT and Digital Strategy
2023-2026 and supporting action plan which will be reviewed annually
with services. 
Page 190

Page 191

Author of Report: Frances Garrow, Head of HR, ICT & OD
Background Papers: 
Ref: SPMAN-1656699058-137 / SPMAN-1656699058-138 /
SPMAN-1656699058-139 
Page 191

Page 192

Page 192

Page 193

Moray Council
ICT & DIGITAL ACTION PLAN 2023/4 
Page 1 of 7 
APPENDIX 1 
Priority Rating: 
1 – critical in terms of scale of impact and/or to success of other actions
2 – wide scale impact and/or supports achievement of other outcomes  
3 – clear benefits but importance may be outweighed by other actions 
4 – ongoing area of work where further development is not required at this stage 
PROJECT/ACTION REQUIRED PLANNED OUTCOME Lead  Timescale Priority
Rating 
PRIORITY 1: Transformation 
1.1   Develop the Council’s Digital
Approach 
Liaise with services to identify
and promote development of
digital technologies that support
effective and efficient service
delivery using insight from the
Digital Maturity Assessment as a
guide. 
Expansion and enhancement of the use
of digital technologies across services to
improve the efficient and effective
delivery of services and ways of working 
Measures: 
Increased number of services available to
the public online 
Increased number of users of additional
online services 
Increased use of digital technology to
strengthen learning, teaching and
assessment 
10% increased use of digital technologies
in key strategic projects 
Info
Sys
Mgr
Mar 24/5
or per
project
1
1.2 Develop Cloud Strategy
Proactively investigate options to
deliver efficiencies through the
adoption of “cloud” / “online”
services where they comply with
PSN requirements, provide cost
effective solutions and do not
introduce unnecessary risk to the
operation of the council. 
Benefits of adopting cloud based
solutions are identified and incorporated
where there is a robust business case for
doing so.
Measure:  
10% of services moved to the Cloud as
assessed viable through agreed
procurement and contract management
procedures 
Info
Sys
Mgr
Mar 25/6 2
1.3 Shared Services 
Participate in further development
of a shared network protocol with
NHS to enable improved
capabilities for shared working
with IJB.
Approach to shared services with NHS
supporting future data sharing and joint
working initiatives. 
Measures 
Info
Sys
Mgr
Mar 2025 • 2
Item 14.
Page 193

Page 194

Moray Council
ICT & DIGITAL ACTION PLAN 2023/4 
Page 2 of 7 
Priority Rating: 
1 – critical in terms of scale of impact and/or to success of other actions
2 – wide scale impact and/or supports achievement of other outcomes  
3 – clear benefits but importance may be outweighed by other actions 
4 – ongoing area of work where further development is not required at this stage 
PROJECT/ACTION REQUIRED PLANNED OUTCOME Lead  Timescale Priority
Rating
Network protocol agreed and
implemented enabling effective shared
working for Health & Social Care. 
1.4 Intranet Improvement 
Further develop the intranet to
provide secure access to all staff
and to promote the intranet as a
staff engagement vehicle. 
Improved intranet facility with a clear
focus on corporate communication that
support the council’s culture and the
employee 
Measure:   
Secure access to interchange for all staff
and underlying content 
Noticeboard functionality opened up to all
council staff 
All staff have the facility to subscribe to
alerts for council services
Info
Sys
Mgr
Oct 2024 2
1.5 M365 Project 
Complete the M365 project.
Collaborative working fully facilitated
through implementation of M365 
Measures: 
90% online staff with access to M365
suite 
90% online staff using M365 suite 
Increase in number of staff that feel they
have the communication tools they
require for hybrid working
Info
Sys
Mgr
Oct 23 2
1.6 Smarter Working: 
Support the Smarter Working
project in embedding hybrid
working in relevant areas
Hybrid working established as the norm.
Council has the capacity to flex and
contract homeworking in line with the
organisational, national and regional
requirements 
Measures: 
Equipment for hybrid meetings rolled out 
Info
Sys
and
ICT
Infra
Mgrs
Oct 23 2
Page 194

Page 195

Moray Council
ICT & DIGITAL ACTION PLAN 2023/4 
Page 3 of 7 
Priority Rating: 
1 – critical in terms of scale of impact and/or to success of other actions
2 – wide scale impact and/or supports achievement of other outcomes  
3 – clear benefits but importance may be outweighed by other actions 
4 – ongoing area of work where further development is not required at this stage 
PROJECT/ACTION REQUIRED PLANNED OUTCOME Lead  Timescale Priority
Rating
Infrastructure for expanded WiFi
implemented in line with Smarter Working
project plan 
80% office based staff utilising mobile
devices 
80% office based staff working flexibly 
Reduction in number of fixed workstation
requirements 
PRIORITY 2: Business Intelligence and Insight 
2.1 Master Data Management 
Continue with the development of
a single trusted view of our
customer to ensure consistency,
accuracy and trust in the data
held to the benefit of the
customer and to add further
efficiency to council services.
Development of a framework to establish
a data sharing solution where data is
requested once. 
Measures: 
Expansion of a golden record for those
customers who contact the council. 
Info
Sys
Mgr
Mar
2025/6
1
2.2 Data Sharing 
Share data, where appropriate,
with council services and partner
organisations to add value to
council services.
Data requested once and shared across
council services where appropriate. 
Measures: 
Data sharing agreements documented. 
Integration with back office systems and
golden record.
Info
Sys /
ICT
Infra
Mgrs
Oct 24 1
2.3 Open Data / Access to
Information 
Explore and enable data
analytics, digital dashboards for
staff, elected members and the
public to view data and to better
understand the underlying trends
within their service and the
actions required to address any
issues or to improve services.
Develop approach and co-design with
services use of big data to connect data,
develop analytics to inform and drive
service efficiency, access to accurate and
timely information to enable informed
decision making. 
Measures: 
Suite of datasets identified for inclusion
within a digital dashboard environment. 
Info
Sys/
ICT
Infra
Mgrs
Mar 24 1
Page 195

Page 196

Moray Council
ICT & DIGITAL ACTION PLAN 2023/4 
Page 4 of 7 
Priority Rating: 
1 – critical in terms of scale of impact and/or to success of other actions
2 – wide scale impact and/or supports achievement of other outcomes  
3 – clear benefits but importance may be outweighed by other actions 
4 – ongoing area of work where further development is not required at this stage 
PROJECT/ACTION REQUIRED PLANNED OUTCOME Lead  Timescale Priority
Rating
Use of Power BI and Power Apps to mine
and use big data effectively
2.4 Usage Reports 
Develop usage reports for
managers to understand how
their service is making use of
ICT.
To make best use of infrastructure used
by services 
Measures: 
Usage reports for licences, equipment
and access to systems. 
Info
Sys
Mgr
Mar 25 3
2.5 Automated Monitoring 
Introduce automated system
monitoring arrangements for our
online services 
Monitoring tools installed and configured
to monitor customer service solutions to
deliver regular performance reports and
major system alerts. 
Measures: 
a) Daily reports produced.
Alerts for major performance issues 
Info
Sys
Mgr
Oct 2024 3 
PRIORITY 3: Compliance 
3.1   Cyber Resilience
Implement enhanced measures
to manage cyber security and
resilience risks 
Enhanced measures for managing cyber
security and resilience risks implemented
through a planned and prioritised
programme of work 
Measures: 
Plan implemented for enhanced risk
based approach as per timescales 
80% of online workforce completed e-
learning modules
ICT
Infra
Mgr
Mar 25  1
3.2 Information security
Review our ICT Security Policy to
ensure that security controls are
adequate and up to date.
ICT infrastructure and systems are
secure and meet the required
accreditation standards. 
Measures: 
Continued PSN accreditation 
ICT
Infra
Mgr
Mar 24 2
Page 196

Page 197

Moray Council
ICT & DIGITAL ACTION PLAN 2023/4 
Page 5 of 7 
Priority Rating: 
1 – critical in terms of scale of impact and/or to success of other actions
2 – wide scale impact and/or supports achievement of other outcomes  
3 – clear benefits but importance may be outweighed by other actions 
4 – ongoing area of work where further development is not required at this stage 
PROJECT/ACTION REQUIRED PLANNED OUTCOME Lead  Timescale Priority
Rating
Cyber essentials accreditation
3.3 Windows Desktop
Maintain our desktop estate to
ensure it is on a recent version of
operating system and office
productivity toolset.
Migration to latest version of Microsoft
Windows / Office. 
Measure:   
All devices migrated.
Info
Sys
Mgr
Mar 25 2
3.4 Business Continuity
Review our business continuity
arrangements to mitigate against
potential risk to position the
council to deliver essential
functions in the event of a
disaster.
Development of a business continuity
plan to ensure that services continue to
operate during emergencies or disasters. 
Measure:   
Business continuity plan documented.
ICT
Infra
Mgr 
Mar 2024 2
3.5 Secure email
Migrate to the next generation
secure email for PSN to continue
to provide secure email solutions
for communicating with
government bodies.
Implementation of a secure email solution
to ensure continued communication with
other government bodies. 
Measure: 
Secure email blueprint solution
implemented.
ICT
Infra
Mgr
Jan 2024 1
3.6 Support methodology 
Enhance the use of ICT support
desk platform to introduce robust
best practice processes and
improved reliability and quality of
service.
Consistent approach to support is
provided across all aspects of the ICT
Service. 
Measures: 
Evaluation/satisfaction tool implemented 
Info
Sys
Mgr 
Mar 2024 3 
PRIORITY 4: Forward Planning 
4.1 Cloud Strategy
Investigate options to deliver
efficiencies through the adoption
of “cloud” / “online” services
where they comply with PSN
requirements, provide cost
effective solutions and do not
introduce unnecessary risk to the
operation of the council.
Benefits of adopting cloud based
solutions are identified and incorporated
where there is a robust business case for
doing so.
Measure:  
10% of services moved to the Cloud as
assessed viable through agreed
ICT
Infra
Mgr
Mar 24 2
Page 197

Page 198

Moray Council
ICT & DIGITAL ACTION PLAN 2023/4 
Page 6 of 7 
Priority Rating: 
1 – critical in terms of scale of impact and/or to success of other actions
2 – wide scale impact and/or supports achievement of other outcomes  
3 – clear benefits but importance may be outweighed by other actions 
4 – ongoing area of work where further development is not required at this stage 
PROJECT/ACTION REQUIRED PLANNED OUTCOME Lead  Timescale Priority
Rating 
procurement and contract management
procedures 
4.2   Corporate System
Replacements
Identify, plan and schedule large
scale corporate system
replacements
Corporate system replacements (Lagan,
Care First, Content Management
System) are robust, secure and suitable
for a digital first Council
Measures: 
Systems replaced within scheduled
timeframes 
Compliance with procurement
procedures and due technical diligence
Info
Sys /
ICT
Infra
Mgrs
As
required
2
4.3 Corporate and Education
network and device
infrastructure
Ensure appropriate technology is
available to suit long term
corporate and educational
requirements, current refresh,
network capability and schools
own purchases
Corporate and Education users are well
equipped with network capability and
devices to carry out their work efficiently
and effectively.
Measures:
Corporate refresh completed in line with
budgetary allocation
Education refresh completed in line with
school requirements and budgetary and
device allocation
Network capability meets corporate and
educational requirements
Schools own purchases received,
configured and delivered/installed
efficiently and timeously
ICT
Infra
Mgr
Oct 2023 2
4.4 Application development
Review mobile application
development tools and
standards.
Benefits of adopting mobile application
development tools and standards
identified and incorporated into forward
plans.
Measure:  
Info
Sys
Mgr
Oct 2024 2
Page 198

Page 199

Moray Council
ICT & DIGITAL ACTION PLAN 2023/4 
Page 7 of 7 
Priority Rating: 
1 – critical in terms of scale of impact and/or to success of other actions
2 – wide scale impact and/or supports achievement of other outcomes  
3 – clear benefits but importance may be outweighed by other actions 
4 – ongoing area of work where further development is not required at this stage 
PROJECT/ACTION REQUIRED PLANNED OUTCOME Lead  Timescale Priority
Rating
Development of mobile application
business case. 
4.5 Review the Unix Server
infrastructure
Review the Unix server
infrastructure to ensure we
continue to deliver value for
money.
Benefits of continuing with the unix server
infrastructure identified and incorporated
into forward plans.
Measure:
Development of business case for unix
server infrastructure.   
ICT
Infra
Mgr
Oct 2024 1
4.6 Telephony 
Review the telephony strategy
taking account of any residual
potential for unified
communications within the
council to deliver further
efficiency savings, linking with
M365 implications where
appropriate, accommodating
PSTN shutdown and other
relevant developments 
Benefits of implementing a structured
telephony strategy including potential for
unified communications, PSTN shutdown
and incorporating into forward plans.
Measure:
Development of a telephony strategy
Development of options appraisal for
demands arising from PSTN shutdown
Business case for unified
communications 
ICT
Infra
Mgr
Oct 23 2
4.7 Rationalise Applications
Review the application portfolio
with a view to rationalising the
number of applications in use
throughout the council, reduce
the number of systems to be
supported and consolidate the
number of data sources.
Benefits of system rationalisation
identified and incorporated into forward
plans.
Measure:
Development of a business case for
system rationalisation.  
Info
Sys
Mgr 
Jan 2024 3
4.8 New Solutions
Consider the potential for new
solutions e.g. AI, Chatbots, the
Internet of Things to deliver
improvements to service delivery
and efficiencies.
Benefits of implementing solutions eg. AI,
Chatbots, IoT identified and incorporated
into forward plans within Services.
Measure:
Number of new technologies adopted
within Services
ICT
Infra/I
nfo
Sys
Mgrs
Mar 25/6 3 
Page 199

Page 200

Page 200

Page 201

Appendix 2 
MORAY COUNCIL
ICT AND DIGITAL STRATEGY (2023-26)  
Item 14.
Page 201

Page 202

1 
1. Introduction 
1.1 The Moray Council ICT and Digital Strategy 2023-2026 sets out how ICT
Service will support the delivery of technology, digital and efficiency related
demands within the Moray Council’s Corporate Plan. 
1.2 The ICT service as an enabling service recognises the need to support the
ambitions of the council and adopt a transformational approach to the use of
ICT and digital to deliver against these priorities. 
1.3 In particular this ICT and Digital strategy is aligned with the Corporate Plan to
deliver against the priorities through: 
• Developing collaborative working through improved capabilities for joined
up working and data sharing across services (including schools) and
partners 
• Increasing the availability and access to easy to use self-service for all
employees and customers.
• Supporting employees to develop their digital skills to make best use of
technology through specific projects e.g. Smarter Working and M365.
• Providing staff with improved access to the data needed to inform their
decision making.
• Making data available to the public to raise awareness of council services
and how they work.
• Adopting best practice in key ICT and digital activities
• Protecting the data held by the council through robust security
arrangements.
• Preparing plans for the future potential uses of technology in line with
service specific and cross cutting digital developments including
identification of digital competence gaps, emerging technologies and the
acquisition of new skills
• Development of digitally enabled learning environments that support
increased access to learning and training, building digital literacy and
resilience
• Refining the Council’s approach to Cloud Services 
• Improving the council’s cyber resilience and security arrangements to
protect ICT, digital and systems infrastructure
• Supporting the delivery of council services. 
Page 202

Page 203

2 
2. Drivers 
2.1 This revision of the Moray Council ICT and Digital Strategy has been
developed against the background of the following drivers: 
Ways of Working - The impact of the COVID-19 pandemic accelerated
changes to the ways of working with the Council readjusting at pace and scale
to accommodate increased homeworking and delivery of new and existing
services to a digital format.   This strategy has been revised to accommodate
the substantive changes the pandemic brought in terms of the council’s
priorities and how the ICT Service has and will continue to contribute as a key
enabler towards their achievement. 
Corporate objectives - The ICT and Digital strategy is aligned to the council’s
overarching strategic priorities contained within the Corporate Plan and the
Local Outcome Improvement Plan including enabling and supporting
transformational change required for modernisation and improvement within
and across services.   
Services and staff expectations - Council services are becoming increasingly
reliant on technology with an increased expectation from and of services to
have access to reliable and forward looking technology which helps them do
their job rather than constrains them.  They require greater flexibility in the
way they work and use technology to be more productive whether at their
desk, in the field or from home.  Services expect: 
• Access to accurate, trusted and timely information and data to perform in
their role and to assist decision making.
• Development of their services using technology to improve service delivery
and achieve efficiency savings.
• To develop their knowledge and skills to deliver change. 
Customer expectations - Customers are continuing to be increasingly
dependent on digital services and in the same way they expect “on demand”
access to commercially available day to day services their expectations of
access to council services is also changing.  This is driving a change in the
way they expect council services to be delivered to them and the council must
change to meet their expectations.  This includes:  
Page 203

Page 204

3 
• Placing the citizen at the core of responsive services, accessing services
at a time and place that is convenient to them and on their chosen device.
• While acknowledging potential compliance issues most of our customers
expect public services to be “joined up” and at the very least with all
Departments within the council.  Sharing of data within the council and
across partner organisations to deliver improvements to service delivery is
imperative to the customer experience.
• Consistency and openness in all their dealings with the Council.
• Choice in how they access services.  Although there is an expectation that
we will provide online services there is a need to balance this with choice. 
While we aim to deliver online services in an easy to use manner and
encourage the uptake of these online services there is a need to cater for
those that prefer, or otherwise do not have access to, online solutions,
although the expectation of delivering online solutions as opposed to face
to face experiences has increased out of necessity due to COVID-19. 
Digital Development (Technological change) - Digital developments provide
the potential to transform council services and there are increasing demands
of service and customer expectations, the opportunities available from new
technologies and the challenges these present including increased
investment, skills development, security requirements.   While the Council has
a history of significant digital progress through the Moray Connected project,
ongoing work with specific services and responding to the service specific
demands of the pandemic, further enhancements and ongoing expansion of
digital technology will remain a priority within this strategy.   
The Council’s Digital Maturity Assessment (through the Digital Office
(Scotland)), and the report and actions arising from that assist in identifying
additional drivers for future developments. 
In addition to this there are organisational culture and behaviour changes that
are often required to support successful implementation of new technology. 
Technology developments that will impact on the delivery of this strategy
include: 
• Digital developments – actions and outcomes from the Digital Maturity
Assessment report and action plan
• Cyber resilience - cyber resilience has acquired an increasingly high
profile following a number of well publicised cyber-attacks on public
sector organisations, geo-political developments and raised warnings
from the UK National Cyber Security Centre and SG Cyber Resilience
Unit.   This has resulted in a significant increase in the work required to
comply with standards arising from the UK and SG responses to the
external environment
Page 204

Page 205

4 
• Supporting increasing numbers of technologies and user bases
including for teachers, children and young people through the Digital
Inclusion work 
• The growth in Cloud computing.
• The use of social media as a service delivery vehicle. 
4 Principles 
All developments within the strategy will be guided by the following principles
to provide consistency and clarity around the work undertaken. 
4.1 Information management
ICT solutions will be developed to ensure they maintain the security,
confidentiality and integrity of all personal data in line with the requirements of
the General Data Protection Regulations (GDPR), other security standards
such as the Payment Card Industry Data Security Standards (PCI/DSS) and
the Scottish Governments Cyber Resilience Programme. 
We will
• Protect the data held through the implementation of best practice security
standards.
• Engage with the Scottish Governments cyber resilience programme.
• Encourage the adoption of open data where possible.
• Improve data available for decision making. 
4.2 Digital first
To continuously improve digital services with the focus on the customer we
aim to adhere to the Digital First Service Standard and the 3 themes of user
needs, technology and business capability / capacity for all digital services,
processes and supporting ICT. 
We will
• Develop systems and processes with the customer at the centre
• Encourage adoption of online, no contact services
• Communicate with our customers electronically where possible.
• Add efficiency to service delivery
• Do it once – share information where possible
• Develop the digital skills of our staff
• Prepare for the future by monitoring developments in technology
4.3 Reuse
The council utilise a range of systems to deliver services to the public and the
core applications will become increasingly important as we pursue a joined up
Page 205

Page 206

5 
council.  Where we are looking for change we will seek to reuse or improve
existing applications rather than developing from scratch.  
We will:
• Reuse solutions and reduce the total number of solutions supported
• Process redesign through the reuse of existing tried and tested solutions
• Reduce the duplication of data collected and establish a single view of our
customer 
4.4 Managed risk
There is a need to employ risk management to drive the service but a
balanced approach will be required to avoid risks preventing or inhibiting
progress to the detriment of our service users. 
We will:
• Work with services to understand their requirements
• Keep services aware of the art of the possible
• Pro-actively look for solutions rather than inhibit development of council
services
• Remove barriers where possible, but where there is a valid reason why
requirements cannot be met, we will provide a clear explanation 
5. Priorities 
From the preceding drivers and principles of this ICT and Digital Strategy, 4
key priorities have been identified for this latest 5 year ICT and Digital
Strategy. 
• Transformation
• Business Intelligence and Insight
• Digital Culture
• Compliance 
5.1 Transformation
The Council seeks to transform services and introduce change for our
customers while driving service efficiencies.  To support these ambitions the
ICT Service will aim to: 
a) Extend the availability of online services available to the public and provide
a single view of their transactions with the council via the customer portal.   
b) Participate in the development of a shared network protocol with NHS to
enable improved capabilities for shared working Health and Social Care
Moray and Digital Health Innovation Group.
Page 206

Page 207

6 
c) Further develop the intranet to provide secure access to all staff wherever
they are working and to promote the intranet as a staff engagement
vehicle.
d) Assist in developing a maturing digital culture within the Council.  A more
informed, mobile and technology or digital aware workforce is one of the
main enabling factors for the transformation of service delivery. 
Employees must be provided with the tools to enable them to provide and
manage the delivery of services anytime and anywhere.  They must have
the training and support to enable them to make best use of the tools
available to them.
(e)Work with Education ICT Strategy Group to deliver the infrastructure to
meet the future needs of ongoing Curriculum Reform and key objectives for
successful digital learning and teaching. 
5.2 Business Intelligence and Insight
Data is one of our most valuable assets and although Moray Council holds
vast amounts of data it is primarily held in departmental silos.  To unlock the
value of this data an open and transparent approach will be developed. 
Providing open and transparent access to data will provide employees the
information to perform their role, managers with the data to manage the
service, Elected Members with the data to make decisions based on timely
and relevant information and also importantly enable the public to understand
the reasons for the decisions we make.  To support this priority we aim to: 
a) Continue with the development of a single trusted view of our customer to
ensure consistency, accuracy and trust in the data held and to benefit the
customer and provide further efficiency to council services.
b) Share data, where appropriate and as guided by individual services and
partners in line with data protection principles and general data protection
regulations to add value to council services using robust and transparent
data sharing agreements.
c) Co-design and enable with individual services digital dashboards for staff,
elected members and the public to view data appropriate to need and
better understand the underlying trends within their service and the actions
required to address any issues and/or to improve services with automation
built in where possible.
d) Develop usage reports for managers to understand how their service is
making use of ICT and digital technologies. 
5.3 Compliance
The ICT service is subjected to an increasing number of compliance regimes
including Public Service Network (PSN) accreditation, General Data
Protection Regulations (GDPR), Payment Card Industry Data Security
Page 207

Page 208

7 
Standards (PCI DSS), Scottish Government Cyber Resilience programme and
software licensing.  There is a need to develop policies and procedures to
ensure an ongoing approach to compliance within the council and this should
be supported by a consistent and managed approach to staff awareness.  To
meet our obligations in relation to compliance and standards we aim to: 
a) Review our ICT Security Policy to ensure that security controls are
adequate and up to date, building on identified good practice.
b) Continue to maintain our device estate to ensure it is built around a recent
operating system version of operating system and that the office
productivity toolset is delivered to current Windows devices
c) Review our business continuity arrangements to mitigate against potential
risk and to put ICT in a position to assist services to deliver essential
functions in the event of a disaster.
d) Migrate to the next generation secure email for PSN to continue to provide
secure email solutions for communicating with government bodies.
e) Adopt industry standard methodology for the delivery of our support
service to introduce robust best practice processes and improved reliability
and quality of service
f) Improve user awareness, knowledge and understanding of role and
responsibility with regard to compliance 
5.4 Plan for the future 
The pace of technology change is increasing and it is important that within the
context of a 5 year strategy we continue to plan for opportunities that are
presented from advancements in technology.  To plan for the future we aim
to:  
a) Investigate options to deliver efficiencies through the adoption of “cloud” /
“online” services where they comply with compliance requirements,
provide cost effective solutions which do not introduce unnecessary risk to
the operation of the council.
b) Review mobile application development tools and standards. 
c) Identify the potential for and implement collaboration tools to deliver further
efficiency savings. 
d) Review the application portfolio with a view to rationalising the number of
applications in use throughout the council, reduced the number of systems
to be supported and consolidate the number of data sources.
e) Consider and investigate the potential of new and emerging technologies
which would be beneficial to the operation of the Council with clear added
value for service delivery and efficiencies including but not restricted to
e.g. Chatbots, Artificial Intelligence (AI) and Large Language Models,
Power Apps/BI, Internet of Things. 
Page 208

Page 209

8 
f) Develop digitally enabled environments (including learning), improving
digital literacy, resilience, connectivity, collaboration. 
Page 209

Page 210

Information
Management Reuse Managed Risk Digital First
ICT AND DIGITAL STRATEGY 2023 - 2026
Principles
Transformation Future planning
Business
Intelligence and
Insight
CompliancePriorities
• Digital culture
• Education
digital inclusion
• Hybrid working
• More online
services
• Shared network
protocol (IJB,
NHSG)
• Intranet
developments
•
Review and
Implement:
• Cloud
computing
• Mobile app
tools
• Collaboration
tools
• Application
portfolio
• New solutions
e.g. AI, IoT,
Chatbots,
Power BI/Apps
• Continue to
develop single
trusted view -
Golden record
• Share data
• Automation 
e.g. Power
BI/Apps, digital
dashboards
• Develop
predictive
technologies
• Usage reports
• Maintain device
and
infrastructure
estate
• Review security
policy
• Business 
continuity
• Secure email
• Support
methodology
(ITIL)
Actions
Corporate
Objectives
Customer
Expectations
Digital/
Technological
Change and
Standards
Services and
Staff
Expectations
Drivers
Page 210

Page 211

REPORT TO: CORPORATE COMMITTEE ON 29 AUGUST 2023 
SUBJECT: CORPORATE RISK REGISTER 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To provide the Committee with a copy of the Council’s recently updated
Corporate Risk Register. 
1.2 This report is submitted to Committee in terms of Section III (B) (36) of the
Council's Scheme of Administration relating to council wide or corporate risk
assessment and the mitigation and management of these risks. 
2. RECOMMENDATION 
2.1 Committee is asked to consider and approve the updated Corporate
Risk Register dated August 2023. 
3. BACKGROUND 
3.1 Risk management is an integral part of good governance and to evidence
management review of the principal risks facing the Council, a Corporate Risk
Register has been developed. This is subject to periodic updating and
approval by the Corporate and Senior Management Teams and to annual
review by the Corporate Committee.  
3.2 The register describes the principal risks facing the Council under nine
generic themes. For each risk theme there is: 
• a description of the risk;
• the risk rating ‘score’;
• supporting information on risk appetite;
• details of controls in place describing how each risk is currently being
managed, and;
• details of current/further mitigating actions.
Item 15.
Page 211

Page 212

3.3 Risk scores are determined by assessing the likelihood of an event occurring
and the impact it potentially could have on the council’s ability to meet its
statutory obligations and deliver on its stated plans. Higher scoring risks, by
definition, need more attention from senior management. A consequence of
this is that the risk register contains risk themes where residual risks score
moderately or highly, despite mitigating measures or controls being in place. 
3.4 Risk appetite is also an important consideration; taking risks can present
opportunities as well as threats; and an assessment of risk appetite considers
whether risks can be tolerated (accepted), treated (reduced), transferred (e.g.
through insurance) or terminated (if the risk is unacceptable) 
3.5 Since the prior review the scoring for one risk theme - Environmental Risk -
has increased. While policy has been developed and practical actions are
being taken forward on multiple fronts to reduce the council’s carbon footprint,
there is an increased likelihood that the council will be unable to secure all of
the funding necessary to enable key dates for moving towards net zero to be
met. Both Likelihood and Impact scores have increased, the aggregate score
moving from 9 (neutral) to 16 (elevated). 
3.6 Three risk areas have seen a reduction in risk score in the latest review,
namely: 
• Regulatory risk considers the council’s ability to meet its statutory
obligations. These can be corporate in nature e.g. the duty to secure sound
financial management, or apply within services including Education, Housing
and Roads. Governance arrangements have been developed over many
years and are subject to regular oversight and monitoring to ensure any new
obligations are met. Overall arrangements were considered when developing
the draft Annual Governance Statement for 2022/23. A neutral scoring has
been allocated with a regulatory breach unlikely but possible with the impact
potentially in the range from significant to minor dependent on the
circumstances presenting. Both Likelihood and Impact scores have
decreased, the aggregate score moving from 16 (elevated) to 9 (neutral).  
• Reputational Risk has regard to established systems, procedures and
controls designed to prevent adverse reputational damage, and how updated
policies increasingly reference the need for prioritisation of scarce resources.
While recognising, at a time of service reduction and curtailment, that the
likelihood of criticism of council services remains high, various mechanisms
including community engagement, media reporting and complaints responses
mitigate the impact of reputational damage. Likelihood score remains high but
the impact score has reduced; the aggregate score moving from 15 (elevated)
to 10 (neutral).
Page 212

Page 213

• Operational Continuity and Performance Risk is an aggregate of various
factors, business continuity work is ongoing to strengthen resilience and plan
as appropriate to minimise disruption; experience of adapting to new ways of
working has increased service flexibility yet threats of service interruption
cannot be wholly eliminated. Performance is actively monitored but is likely to
diminish in certain areas should services be scaled back due to changes in
policy priorities; the assessment is that this is increasingly understood by
citizens and service users.  Overall the position is assessed as having
improved since the prior review with both likelihood and impact decreasing,
the aggregate score moving from 16 (elevated) to 9 (neutral). 
3.7 The risk previously described a “Political Risk” has been re phrased as
Leadership Risk to reflect the terminology used in recent Best Value reports
and to reflect that member/officer relations form part of this risk. 
3.8 The completed risk register is attached for consideration by Committee as
Appendix 1. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) 
Effective risk management practices are necessary to evidence how the
Council identifies and seeks to address any issues that may impact on
its ability to deliver its stated priorities and plans 
(b) Policy and Legal 
Effective risk management practice is an essential component of
good governance. 
(c) Financial implications 
The risk register recognises the financial challenges facing the
council and the importance of addressing these. There are no direct
financial implications arising from this report. 
(d) Risk Implications 
Risk and its management is the subject of this report. 
(e) Staffing Implications 
The risk register refers to Staffing Risks. No direct implications. 
(f) Property 
No direct implications.
Page 213

Page 214

(g) Equalities/Socio Economic Impact 
No direct implications. 
(h) Climate Change and Biodiversity Impacts 
The risk register refers to climate change considerations under
Environmental Risks. No direct implications. 
(i) Consultations 
The Corporate Management Team and Senior Management Team have
participated in updating of the Corporate Risk Register. 
5. CONCLUSION 
5.1 Following its review and updating by the Corporate and Senior
Management teams, the Committee is asked to consider and approve
the latest Corporate Risk Register dated August 2023. 
Author of Report:  Atholl Scott, Business Continuity and Risk Management
Officer 
Background Papers:  None 
Ref:  SPMAN-2045703626-292 / SPMAN-2045703626-291 
Page 214

Page 215

Appendix 1       
MORAY COUNCIL 
CORPORATE RISK REGISTER AS AT
AUGUST 2023 
Item 15.
Page 215

Page 216

Appendix 1       
SUMMARY OF PRINCIPAL RISKS  
Nature of Risk Main issues Risk Score Risk
Movement
1. Leadership Leadership challenges remain. Central relationships and decision making processes
can be strained and ineffective; Risk is unchanged.  20 
2. Financial Demand for services outstrips available budget. Council is unable to make savings or
generate income that meets expectations of government, citizens or regulators.
Financial settlements for councils remain uncertain in the longer term. Current
position is unsustainable; risk remains very high. 
20 
3.  HR (Staffing) Inability to recruit and retain well qualified or experienced staff across a number of
service areas, staff workloads are unsustainable. Additional pressures associated
with pandemic resulting in increased absenteeism and reduced staff morale. Suite
of measures developed in mitigation, but residual risk still assessed as very high. 
20 
4. Regulatory Expected governance standards are unmet. Statutory or regulatory breaches
occur. Council is subject to censure. Governance systems and processes mitigate;
and upon review, the overall assessment is that this risk has diminished. 
9  
5. Environmental Impact of climate change including severe weather events. Clear route map to zero
established and approved. Lessons learned from response to storm events of winter
2021/22 and action plans developed. Limited capacity to drive forward multiple
initiatives is evident. Latest assessment is that progress necessary to meet plan
targets will require significant external funding; this risk score has increased. 
16 
6. Reputational Council decisions result in litigation/judicial review; expectations from external
inspections and of service users are not met; performance targets set at levels
not aligned to capacity to deliver. While reputational issues remain likely to occur
from time to time given the range and scale of services delivered; the impact of
same is typically localised; this risk score has reduced. 
10 
7.  Operational             
Continuity and                 
Performance
Council performance falls below targeted levels for sustained period; impacts of the
pandemic and the need to focus on priorities; transformational change impacts on
service delivery. While this risk cannot be entirely separated from other risks 
9  
Page 216

Page 217

Appendix 1       
identified, increasingly there is a greater understanding of the environment in which
the council operates in and a need to manage expectations; in this context the risk
score is reduced with likelihood and impact assessed as possible and moderate
respectively.
8.  IT (Technological) Major disruption in continuity of ICT operations; new ways of working create
added pressures for ICT staff; data security is compromised. With ICT systems
integral to  the effective delivery of most if not all services, the impact from
disruption to services is at the highest level and notwithstanding risk mitigation
measures in place, the potential for disruption e.g. from external threats remains
likely. The risk level here is unchanged. 
20 
9.  Economic   
Recovery/             
Sustainability
The council has delivered its economic recovery plan post the pandemic and
refreshed with partners the Moray Economic Strategy. Growth Deal projects are
progressing as planned; but challenges remain post pandemic including
inflationary pressures and a tight labour market; in overall terms, this risk is
unchanged. 
16 
Page 217

Page 218

Appendix 1       
RISK CLASSIFICATION 
RISK RATING LOW MEDIUM HIGH VERY HIGH
RISK MOVEMENT DECREASE
↓
NO CHANGE
↔
INCREASE
↑
The process for managing risk is documented separately in the council’s risk policy, strategy and guidance notes. The
risk rating is calculated by reference to assessed likelihood and impact (on a scale of 1 to 5) for each identified risk. The
minimum score (lowest risk) being 1x1=1, the maximum (highest risk) 5x5 =25. Scores of 3 and below are ranked low,
green; between 4 and 6 medium, yellow; between 8 and 12 high, amber; and 15 and above very high, red, as per the table
below. 
LIKELIHOOD 
Almost certain 5 5 10 15 20 25 
Likely 4 4 8 12 16 20 
Possible 3 3 6 9 12 15 
Unlikely 2 2 4 6 8 10
Remote 1 1 2 3 4 5 
1 2 3 4 5 
Minimal Minor Moderate Major Catastrophic 
IMPACT
Page 218

Page 219

Appendix 1       
1.
Description of Risk: Leadership: Political priorities are not achieved; decision making processes are ineffective; partnership working is not
optimised. Addressing this risk is central to the future provision of public services in Moray. While wider external political influences will continue
to shape the future direction of the council in terms of its ability to deliver services either on its own or in partnership with others, the Best Value
Assurance Report (BVAR) - progress report dated March 2022 called for committed decisive leadership and for the council to aim for a positive culture
in which elected members and senior officers work effectively together.  Work to achieve this has continued with a programme of induction for elected
members taken forward. The Chief Executive also provided a meeting of the council with a corporate overview of council priorities, in a report which
reinforced the need for a clear strategic direction in difficult times. Despite these interventions, the likelihood of cohesiveness in decision making remains
a particular challenge, and is assessed as unlikely to change significantly in the lead up to national parliamentary elections scheduled for 2024.    
Lead: Elected Members / Council Administration / Chief Executive / Corporate Management Team
Risk Rating: low/medium/high/very high Rationale for Risk Rating:
The risk rating is unchanged since the register was last published in
August 2022 despite some progress being made to address Best
Value, uncertainty remains about the council’s capacity to demonstrate
strong decisive leadership. Likelihood is assessed as likely at point 4
of the scale 1 to 5 in terms of the risk classification table. Impact
remains at the highest level of 5, acknowledging that political
differences or a breakdown of trust in member/officer relations may
adversely affect progress towards delivery of the strategic priorities of
the council. Further planned activity around collaborative leadership
should help mitigate this risk. 
VERY HIGH
Likelihood 4 x Impact 5 = Score 20
Risk Movement: increase/decrease/no change Risk Appetite:
There is a strong appetite for the council to be successful in delivering
best value services for its citizens against a challenging background of
increasing demand and diminishing resources and a need to identify
service priorities. Political stability is key to this success. 
Page 219

Page 220

Appendix 1       
Controls: Current and Proposed Mitigating Actions: 
Best Value follow-up report action plan signposting challenges
associated with securing continuous improvement
Comprehensive elected member induction training programme
delivered post 2022 election.
Ten year strategic plan - Moray 2027 (the Local Outcomes
Improvement Plan) being delivered jointly by the council and its
community planning partners.
Corporate Plan 2019-2024 in place setting out high level council
priorities. 
Plans emphasise prevention and resilience to reduce partner
interventions and aid securing of sustainable outcomes.
Suite of Governance Documents in place and regularly updated;
Remit of Audit and Scrutiny Committee including Scrutiny Guide
reviewed and considered by Council
Engagement at councillor and officer level with government, COSLA
and audit bodies re political challenges facing the council.
Political group leaders meet regularly to discuss areas of risk and
determine areas of consensus and disagreement as an aid to
collegiate working. 
Corporate Management Team/Senior Management Team will
continue to provide support and advice to elected members on
sustainability of any proposals for change.
Corporate Plan under review to ensure stated priorities reflect those of
the new council, with progress update provided to Council in February
2023. LOIP aims under review. 
Monitoring officer to continue statutory role of ensuring legality of
decision making processes.
Specific resourcing of projects and priorities to provide and advance
clear plans to deliver objectives over time.
Accounts Commission overview report on Local Government in
Scotland 2023 recommendations on leadership, collaboration with
others and use of data to inform strategic decision making. 
Work has been ongoing on collaborative leadership which dovetails
with the Best Value Thematic Review on this topic and an action plan
will be framed based on findings.
Current performance: The framework for political governance has
been affirmed using the controls outlined above. The Council has been
alerted to the significant challenges it faces from both internal and
external pressures as it seeks to continue to deliver Best Value
services to the community it serves.
Comments: Political risks can be mitigated to some extent by
structures and processes that regulate the workings of the council and
these continue to be developed. However, risks remain likely in the
current economic climate and as a consequence of the political
balance of the council. 
Page 220

Page 221

Appendix 1       
2.
Description of Risk: Financial: There is a risk of financial failure with demand outstripping available budget. While a budget has been
agreed for 2023/24, risks highlighted previously by the Chief Financial Officer remain, including uncertain levels of government funding in
future years, price inflation, the potential for further increases in interest rates leading to higher borrowing costs, and pay award settlements
unknown. Ring fenced funding, in particular for teachers and pupil support staff, also limits the council’s ability to manage workforce
numbers and associated budgets. 
Savings targets required for 2023/24 have been identified as likely to be particularly challenging, with improvement and modernisation of
services a key priority for the council to take forward. This has the potential to impact on all sectors of the community, particularly so on
those who are most disadvantaged, and the council recognises its duty to minimise inequality by targeting support towards those who need
it most. Financial risk is being actively managed with financial monitoring and reporting undertaken throughout the year. 
Lead: Corporate Management Team/ Senior Management Team/ Chief Financial Officer (Section 95 Officer)
Risk Rating: low/medium/high/very high Rationale for Risk Rating: 
The Council has consistently delivered significant savings in recent
years but the need to make further savings remains undiminished,
and the challenge of continuing to do so while meeting service
demands will be increased given the factors outlined above.
Likelihood risk remains at the highest level.  The impact remains at
high noting that the council is committed to protecting the most
vulnerable and disadvantaged when any changes in service delivery
are proposed.   
VERY HIGH
Likelihood 5 x Impact 4 = Score 20
Risk Movement: increase/decrease/no change Risk Appetite:
The council has no risk appetite for financial failure given its statutory
requirement to manage its resources in a responsible and prudent
manner and to continue to deliver statutory services. However it also
recognises, as a consequence of financial constraints, that services
being curtailed are likely to result in a diminution of performance.
Expectations of service users will require to be managed. There is
also a recognition that public finances generally are constrained with
uncertainty around future financial settlements, noting that full details
of the ‘New Deal’ that seeks to reset the relationship between
councils and the Scottish Government will not be available until later
in 2023/24 financial year. 
Page 221

Page 222

Appendix 1       
Controls:
Financial plan in place with budget projections in place for current and
next two financial years.
Financial pressures identified.
Short to medium term financial strategy under review. 
Regular budget monitoring reports (on capital and revenue)
presented to council
Financial regulations in place and regularly reviewed.
Property Asset Management Plan established, including Capital
Strategy
Treasury Management strategy.
Procurement Policies and Practice
Energy Monitoring.
Internal and External Auditing
Plans in place for participatory budgeting
Regular reporting of ongoing short to medium term financial planning
to committee
Annual pricing review on charges for services. 
Current and Proposed Mitigating Actions:
Continued development of short to medium term financial strategy and
supporting actions to drive and secure savings for 24/25.
Financial plan reporting to ensure council oversight and visibility of
progress to addressing the budget gap
Production of a Medium to Long Term Financial Plan being planned in
tandem with consideration of the role of transformation and what the
future council will look like in the context of the Council’s finances. 
Work of the ‘Transforming the Council’ and Programme Boards
including the BVAR and the Improvement and Modernisation
Programme to inform further change and potential for redesign of
services.
Optimise, to the extent possible within available resources, access to
additional funding streams from government and other external
sources, in the form of specific grants or other ring fenced funding.
Asset base requires sustainable rationalisation with the Smarter
Working and Depot Review projects moving forward as well as
school estate strategy.
Community Engagement/Public Consultations planned as appropriate.
.
Current performance: Despite the challenges outlined above an
agreed budget for 2023/24 has been secured. The Annual Accounts for
2022/23 have been prepared and published in draft and are currently
subject to audit. Financial monitoring of capital and revenue spend
continues.
Comments: Financial risk is likely to remain very high for the
foreseeable notwithstanding controls in place and planned mitigating
actions. 
Page 222

Page 223

Appendix 1       
3.
Description of Risk: Human Resources (People): Effect of planned staffing reductions on services, both on staff directly affected and on
workloads of staff in teams where staff numbers are reduced.  The flexible working policy has in part alleviated service pressures but with
small teams, competing demands and a need to develop capacity for change, staff morale can be affected. High staff turnover and resultant
vacancies also increases the risk of being unable to meet service demands, resulting in a focus on short term requirements to the detriment
of planning for longer term service improvement. 
Inability to recruit and retain well qualified or experienced staff, staff unprepared for change, lack of staff engagement, inadequate health and
safety arrangements. With staff the council’s most important resource, there is a need to ensure employees are equipped to embrace change
and deliver services in different and innovative ways that as far as possible are sustainable at a time when resources are reducing. This will
prove challenging given that further budget reductions are required, with potential workforce implications. There is also an increased risk that
corporate and service plan targets will not be met, leading to reduced service quality and performance, a failure to deliver Best Value and
less than satisfactory reports from inspectorates and other agencies.
Lead: Depute Chief Executive (Education, Communities and OD); Head of HR, ICT and OD.
Risk Rating: low/medium/high/very high Rationale for Risk Rating:
Reduced ability of smaller teams to deal with competing and complex
demands and to forward plan across a wider Council agenda and be
ready with a strategic response.
Difficult to recruit in a range of areas including certain subject
teachers; vehicle technicians; specialist professional posts; senior
management; clerical and administrative roles; temporary and relief
staff; and community care employees.
Staff turnover leads to loss of expertise and ‘corporate memory’ but
workforce planning is used to offset this, especially for key roles.
Inability to meet service demands and secure continuous
improvement.
Staff morale and productivity is adversely affected as a consequence
of residual issues arising from the pandemic.
Given the foregoing issues the risk rating remains at a very high level
with current staffing challenges almost certain to continue, leading to
a likelihood score of 5 with consequential moderate to high impacts in
service areas directly affected. 
VERY HIGH
Likelihood 5 x Impact 4 = Score 20
Page 223

Page 224

Appendix 1       
Risk Movement: increase/decrease/no change Risk Appetite:
The council as a responsible employer has a duty to provide a safe,
attractive and rewarding place to work, with employees central to
the successful delivery of the council’s strategic and service
priorities. Accordingly, while acknowledging challenges in aspects
of public sector recruitment and necessary changes to working
practices post pandemic and to secure efficiencies, there remains a
strong appetite to ensure staff morale and motivation is maintained
at a high level and that the council is seen as an attractive place to
work.  
Controls:
Corporate Workforce Plan, (reviewed and updated annually) in place
Leadership Development Programme established
Moray Management Methods promote consistency
Employee Review and Development Programmes in place for
teaching and non - teaching staff
Employee Communications & Engagement Framework (including
Interchange bulletins, senior manager visits and manager forums)
Health and Work Policy
Health and Safety Policies and Annual Report.
Absence Management Policy 
Living Wage Employer accreditation secured to support recruitment
strategies.
Flexible working policy refreshed and rolled out as part of Smarter
Working Initiative.
Fire risk assessments completed in line with planned schedule.
Mental health and wellbeing Pulse Survey results used to inform
improvement actions 
Current and Proposed Mitigating Actions:
Continue to monitor senior management capacity to ensure it is
sustainable and  sufficient to deliver the transformational change
programme required to secure financial stability, in addition to
‘business as usual’.
Annual Review of Workforce Strategy and Plan completed and
activity to address the main themes of:
Leadership capacity and development; ensuring leaders,
managers and supervisors are equipped with skills and
behaviours necessary for new ways of working.
Supporting the workforce through a period of change including
active management of vacancies and maintaining good
employee relations.
Organisational Development, with the workforce empowered
and enabled to embrace change through a range of in-person
and on-line training opportunities 
Reviewing recruitment and retention strategies to make the
council an attractive place to work, continuing with
apprenticeships and training programmes, and developing
succession planning, where appropriate.
Health and Wellbeing initiatives being taken forward to support
staff in the workplace with linked objectives of proactively
supporting attendance at work and reducing absenteeism. Page 224

Page 225

Appendix 1       
Current performance: HR (staffing) risks were manifold for the
duration of the pandemic with a reactive and adaptive response often
required to maintain service continuity. Now in the recovery stage, the
updated workforce plan gives new focus and direction to the HR
service by establishing clear priorities. These are designed to provide
both management and staff with the knowledge, skills and disciplines
necessary to meet the council’s transformation agenda.   
Comments: This risk is being actively managed but may be
impacted upon further should staffing arrangements or levels be
subject to change in the incoming period.
Page 225

Page 226

Appendix 1       
4.
Description of Risk: Regulatory: Expected governance standards are unmet. Council is subject to censure.
The council is heavily regulated by statute, by national guidance and through local policy and procedures and, within its systems, has
established checks and balances to support delivery of intended outcomes. Adapting council priorities and plans to accommodate new duties
is key to limiting the risk of regulatory failure with elected members, on the advice of senior officers, being responsible for creating capacity to
accommodate changes to policy and service delivery revisions. 
Lead: Corporate Management Team/ Chief Financial Officer/ Monitoring Officer/ Heads of Service
Risk Rating: low/medium/high/very high Rationale for Risk Rating:
Governance arrangements have been developed over many years
and are subject to regular oversight and monitoring.
Systems and processes are subject to on-going review and
development within the council and its services.
Corporate support and review in relation to performance, audit, and
inspection.
Change increases the risk of system breakdown and non-compliance
with regulatory requirements.
In the current economic climate and having regard to the challenges
facing the wider public sector a neutral scoring has been allocated
with a regulatory breach not likely but possible and the impact
potentially in the range from significant to minor dependent on the
circumstances presenting.   
HIGH
Likelihood 3 x Impact 3 = Score 9
Risk Movement: increase/decrease/no change Risk Appetite:
The council has zero appetite for regulatory failure and takes seriously
its responsibility to ensure all services are in compliance with
statutory regulations and standards. A robust approach is taken to
securing governance arrangements which includes suitable systems
of internal control, albeit capacity issues can emerge where new
duties are placed on the council. 
Page 226

Page 227

Appendix 1       
Controls:
Governance statement prepared annually in line with best practice
guidance.
Monitoring officer oversees governance processes.
Constitutional documents available to direct good governance. 
External scrutiny and inspection programme
Internal and external audit arrangements
Suite of Governance and Scrutiny documents in place and
regularly updated.
Current and Proposed Mitigating Actions:
Continue to monitor likely impacts from new policy initiatives that
have the potential to require significant council resource inputs.
Consider statutory duties and other directions when updating
strategic plans acknowledging these when developing council
priorities.
Ensure capacity to deliver new duties is fully considered and
anticipate and report on any implications that have potential to lead
to non-compliance. 
Complete delivery of actions in Best Value action plan.
Pro-active management response to issues raised in inspection
reports.
Continued active participation in delivery of joint services with statutory
and other partners as appropriate. 
Current performance: The council considers its current governance
arrangements to be generally fit for purpose, acknowledging that these
need to remain under active management and review to meet any
revised regulatory challenges the council may face. 
Comments: The public sector is highly regulated with legislation and
best practice guidance adopted both corporately and within services
to ensure openness and accountability for the use of public funds.
Established practices remain likely to be challenged by change and by
expectations of service users. 
Page 227

Page 228

Appendix 1       
5.
Description of Risk: Environmental: Ability of the council to respond to climate change emergency, to keep up with the pace of changing
carbon reduction, waste and environmental targets. Impact of climate change and severe weather events; ability to deal with unforeseen
emergencies is compromised by inadequate resilience. The council continues to invest in projects to address climate change issues, to
manage energy use and ensure it is well placed to respond to crisis situations in conjunction with the emergency services and other partners.
Lead: Depute Chief Executive (Economy, Environment and Finance), Head of Environmental and Commercial Services
Risk Rating: low/medium/high/very high Rationale for Risk Rating:
This risk, although multi-faceted and challenging, has
been partially mitigated by progress made to reduce
current and future threats through the development of
clear action plans, noting that longer term achievement of
climate targets will only be feasible if additional external
funding is secured. Given this and wider economic
challenges, the likelihood of targets slipping has been
increased, and thus impact will also increase should plans
for achieving net zero be delayed. The situation remains
under close review by the Climate Change team. It also
remains the case that any reduction in workforce from
budget balancing exercise could impact on the council’s
ability to respond to emergency environmental situations
arising from adverse weather events. 
HIGH
Likelihood  4 x Impact  4 = Score
16
Risk Movement: increase/decrease/no change Risk Appetite:
Proportionality is reflected in risk appetite such that the
development and application of preventative measures
mitigates risks to pre-determined and achievable levels
recognising it is neither feasible nor affordable to eliminate
every environmental risk that may be faced. 
Page 228

Page 229

Appendix 1       
Controls:
Climate Change Strategy for 2020-2030 in place
Climate change route map to zero updated and subject to ongoing monitoring 
Climate change and energy teams in place
Recycling awareness promoted and high rates achieved. 
Residual waste no longer sent to landfill but processed through energy from
waste plant. 
Street light replacement programme completed to reduce carbon emissions and
energy costs.
Electric pool cars introduced as part of council fleet de-carbonisation together
with cycling/walking initiatives.
Housing investment programme which aims to achieve energy efficiency
standards 
Moray Development Plan considers climate change issues 
Council part of North of Scotland Regional Resilience Partnership
Council Co-ordination Centre established and operational; crisis communications
secured
Emergency response co-ordinators and support staff identified and trained. 
Current and Proposed Mitigating Actions: 
Growth Deal –Bus Revolution being implemented to
improve access to greener travel.
Coastal erosion/ protection – strategy under development
Smarter Working policy developed and Depot Review
being progressed– both contributing to de-carbonisation
through reduced staff travel and smaller portfolio of
buildings to service and maintain.
Route map to zero monitoring and reporting.
Supporting locally sourced procurement to limit
environmental impacts.
Planning for emergency disruption from extreme weather
events continues.
Continue working with partners where appropriate to
secure additional funding that will support climate change
mitigation initiatives e.g. Just Transition Fund 
Current performance: Existing controls and mitigating actions seek to maintain
and enhance Moray’s reputation as a thriving area and a great place to live. The
practicalities and costs of achieving the climate change commitments will remain
challenging throughout delivery of the programme to secure net zero. The latest
data available indicates that 2030 remains in the range of possible dates when net
zero will be met; this however is dependent on the council committing to an
aspirational approach to reducing carbon emissions in key areas, while accepting
that the ability to implement such an approach is currently uncertain unless
significant external funding is secured. 
Comments: Climate change targets and associated costs
are significant and will impact on all Council services. 
Page 229

Page 230

Appendix 1       
6.
Description of Risk: Reputational: Not meeting agreed performance targets (e.g. on educational attainment); Not delivering on key projects
within Improvement and Modernisation Programme, over spending or failing on a school build; failure on Best Value delivery plan; Major
adult or child protection failure: Missing a major policy direction or funding opportunity because resources are so tight.
The council provides services to all sectors of the community and while committed to high service standards, the diversity of service provision
and the expectations of the public may increase the risk that the council’s reputation could be called into question. This risk generally is
considered to be managed through performance management, organisational development, the application of codes of conduct, complaints
procedures and similar, however any reduction in services to any individual or group of individuals may justly or otherwise impact on the
Council’s reputation.
Lead: Corporate Management Team/ Heads of Service/
Risk Rating: low/medium/high/very high Rationale for Risk Rating:
The risk rating has regard to established systems, procedures and
controls designed to prevent adverse reputational damage, and how
updated policies increasingly reference the need for prioritisation of
scarce resources. This recognises that at a time of service reduction
and curtailment the likelihood of increased criticism of council
services remains at the highest level albeit the impact following
consideration has been reduced.  In part this is based on it being
evident that service delivery challenges apply across the public
sector and through various mechanisms including community
engagement, media reports nationally and locally, and complaints
responses there is an increased understanding of the challenges
faced. As such the impact from any reputational damage the council
may face has been reduced from moderate to minor.   
HIGH
Likelihood 5 x Impact 2 = Score 10
Risk Movement: increase/decrease/no change Risk Appetite:
The council endeavours to avoid reputational risk and is committed
to continuous improvement in the delivery of services either on its
own or with partners. It seeks to deliver these services having regard
to its equality duty and has set targets for doing so through a
customer charter. However it is accepted that reputational damage is
a potential consequence of service reduction or cessation. 
Page 230

Page 231

Appendix 1       
Controls:
A suite of policy, strategy, governance, organisational development,
project management and performance management measures are in
place to enable delivery of the services to a standard which mitigates
the risk of significant damage to the council’s reputation.
Consultation protocols established and range of consultation and
engagement with public and workforce carried out over period of time.
Customer charter in place and customer focus strategy developed to
improve citizen engagements and provide a consistent experience
across services
Formal complaints procedures in place
Performance management reporting framework updated
Corporate Management Team monitors external inspection processes
and outcomes.
Freedom of Information processes.
Risks fully considered in committee reports requiring a decision.
Suite of Governance and Scrutiny Documents in place and regularly
updated.
Current and Proposed Mitigating Actions:
Ongoing review, redesign and implementation of policy, strategy
governance, organisational development, project management and
performance management.
Regular meetings with officers and inspection agencies to support and
challenge progress towards improvement.
Effectiveness of customer focus strategy to be monitored
Means of communicating changes impacting service users to be
monitored
Improved outcome reporting of service delivery and linked
performance indicator measures
Progress Improvement and Modernisation Programme to optimise
service delivery arrangements 
Current performance: 
It is unlikely the risk of reputational damage can ever be fully
eliminated given the breadth of services the council provides,
nonetheless, the council takes its obligation to mitigate risk through
the establishment and application of controls detailed above.
Comments: A range of measures are in place to regulate how the
council interacts with citizens and to address any issues where
recipients of services are dissatisfied with outcomes. 
Page 231

Page 232

Appendix 1       
7.
Description of Risk: Operational Continuity and Performance: The council is unable to deliver services or performance falls below
acceptable levels for a sustained period; insufficient business continuity planning; changes in working practices impact on service delivery.
Going forward it is recognised that operational continuity and performance may be affected as a consequence of service re-design and
changes in service delivery and challenges remain to ensure alignment of available resources to service delivery standards. 
Lead: Corporate Management Team/ Heads of Service
Risk Rating: low/medium/high/very high Rationale for Risk Rating: 
The risk rating is an aggregate of various factors, business continuity
work is ongoing to strengthen resilience and plan as appropriate to
minimise disruption; experience of adapting to new ways of working
has increased service flexibility yet threats of disruption  e.g. from
extreme weather events, remain. Performance is actively monitored
but is likely to diminish in certain areas should services be scaled back
due to changes in policy priorities; in such circumstances this risk will
require active management.  Overall the position is assessed as
having improved since the prior review with likelihood and impact
assessed as possible and moderate respectively. 
HIGH
Likelihood 3 x Impact 3 = Score 9
Risk Movement: increase/decrease/no change Risk Appetite:
The risk appetite acknowledges the responsibility the council has to
maintain delivery of statutory services and ensure the needs of the
vulnerable service users are met.   
Controls:
List of critical functions agreed by Corporate Management Team
Programme for updating business continuity plans in place for critical
services.
Organisational Development Team promoting workforce and
leadership development
Communication strategy for informing service users of impending
changes to services developed.
Improvement and Modernisation Programme 
Current and Proposed Mitigating Actions:
Update service risk registers.
Update Business continuity procedures and plans to take into account
staff changes and service reconfigurations
Ensure clear links between identified risks and service plans are
maintained.
Review Performance Management Framework to ensure it aligns
appropriately to revisions to service provision. 
Page 232

Page 233

Appendix 1       
Current performance: A range of measures is in place to secure
operational continuity and performance for current service provision,
with it being recognised that these measures may need to be revisited
as a consequence of change. The focus remains on ensuring that key
and vital services are provided as a priority.
Comments: Developments under this risk category are predicated on
change with risks around operational continuity and performance
dependent on the nature and scale of services delivered in future
periods. 
Page 233

Page 234

Appendix 1       
8.
Description of Risk: IT (Technological) Major disruption in continuity of ICT operations; data security is compromised. Changes in working
practices post pandemic more reliant on ICT infrastructure, capacity and support. The risk of cyber-attacks remains and cannot be
eliminated, with attacks being nuanced over time and requiring the council to constantly be alert to new threats. The prevalence of working
from home results in greater isolation, and increases the risk of malicious emails and data breaches.  
Lead: Corporate Management Team/ Depute Chief Executive (Education, Communities and OD)/ Head of HR, ICT and OD
Risk Rating: low/medium/high/very high Rationale for Risk Rating:
A recurring theme from senior management relative to their
experiences during the course of the pandemic is that the success of
their services in many respects is predicated on the availability of
robust and adaptable ICT systems. This creates an elevated risk that
has been recognised centrally, albeit it brings with it a number of
challenges in terms of resourcing changed ways of working both to
infrastructure and in terms of staffing to support that change in a timely
manner. Meanwhile cyber security continues to have a high profile and
the ICT service has a suite of controls in place to mitigate known risks
in this area. Intelligence in relation to recent successful cyber-attacks
has highlighted that the disruption to the affected organisations can be
widespread, and the recovery process is likely to take a significant
amount of time to restore business operations fully. 
VERY HIGH
Likelihood 4 x Impact 5 = 20
Risk Movement: increase/decrease/no change Risk Appetite:
There is zero appetite for service interruption or data loss, as this has
the potential for catastrophic impact on service delivery and the cost
of system disruption or data protection breaches can run to hundreds
of thousands of pounds. The security and continuity of ICT services is
therefore of vital importance and this is reflected in the range of
controls in place. 
Controls:  
Corporate Information Security Policy. Senior Information Risk Officer.
External   accreditation   processes   for Network Security(Public
Services Network, Cyber Essentials Plus)
Environmental Controls for Data Centre (cooling, fire, flood and
backup power)
Boundary Firewalls and Internet Gateways (email and web filtering)
Data control enhanced through network controls
Malware Protection
Cyber resilience standards aligned to SG Cyber Resilience
Framework
Current and Proposed Mitigating Actions:
Information Security Policy review /update underway
Computer Use Policy to be refreshed
Assess controls as part of plans for continuing development
of digital services.
Penetration testing for applications implemented to deliver
digital services
Participation in the Scottish Government Cyber Resilience Programme 
Extend accreditation process to include the Education ICT network
Continue with implementation of programme of work to address
awareness raising, e-learning and phishing campaigns to educate Page 234

Page 235

Appendix 1       
Cyber Incident Response Plan 
Patch management (Applications and Infrastructure)
Third Party Maintenance Agreements (Applications and
Infrastructure)  
Main financial system supported in-house
Information Assurance Group
Records Management Policy 
Data breach reporting arrangements 
Working from home policy/guidance 
users of ICT systems– attempting to mitigate and reduce the ‘human
error’ element.
Complete the review of the ICT Business Continuity Plan 
Cyber Resilience – ongoing monitoring and application of emerging
best practice
Continue to monitor feasibility of insurance cover for cyber-attacks. 
Current performance: The risks associated with the delivery of ICT
are constantly evolving, and the controls outlined above together with
on-going vigilance are necessary to prevent disruption to critical
services. 
Comments: The suite of controls in place reflects the council’s
commitment to securing data held and used in the effective delivery of
modern council services. 
Page 235

Page 236

9.
Description of Risk: Economic Sustainability. Risk of prolonged economic downturn following the pandemic and exit from European Union.
Higher inflation and increases in interest rates have the potential to an impact on capital projects including the Moray Growth Deal. The cost
of doing business and higher energy costs adversely impact on the business community.  Increased strain on household incomes /budgets
may impact on council tax revenues and income from council house rents; business failures may create similar pressures on business rates.
There is increased demand for welfare benefits and money advice services. Many of these are factors outside the control of the council, but
continue to have an influence on how it reacts and plans for the future.
Lead:  Corporate Management Team/ Depute Chief Executive (Economy, Environment and Finance)
Risk Rating: low/medium/high/very high Rationale for Risk Rating:
The risk rating is unchanged. While progress has been made in
delivering an economic recovery plan prepared in response to the
circumstances presenting since the pandemic, challenges remain. The
cost of living crisis, a reduction in the working age population, housing,
and childcare are significant barriers to economic growth. These are
reflected in an updated Moray Economic Strategy, which has clear
links to the Local Outcomes Improvement Plan.   
HIGH
Likelihood 4 x Impact 4 = 16
Risk Movement: increase/decrease/no change Risk Appetite:
The Local Outcomes Improvement Plan developed with partners
includes as its priorities; a diverse, inclusive and sustainable economy;
building a better future for the young; and improving well-being of our
population; all of which are dependent on a strong and flourishing
economy. As such the council has an appetite for positive risk taking
where the implications of doing so are known and understood, while
avoiding adverse impacts on activity across all sectors of the economy. 
Controls:
Moray Growth Deal - Funding for Growth Deal being progressed
bringing total investment to the area of over £100m.
Growth deal governance arrangements in place and elements of
programme being delivered in line with timetable 
Moray Economic Strategy ten year strategy refreshed post pandemic
and aligned to LOIP outcomes
Partnership working with Highlands and Islands Enterprise, Moray
College UHI, Skills Development Scotland and others. 
Current and Proposed Mitigating Actions:
Progress Growth Deal projects in line with programme.
Continue work with partners to develop and deliver support aligned to
economic strategy objectives that include: 
• Increasing employment levels and number of companies
• Ensuring alignment between skills provision and the changing
economy
• Increased productivity leading to growing wages and
contributing to closing the gender pay gap
• A labour market that provides the required numbers of workers
to take advantage of available opportunities-notably attraction
and retention of those aged 16-29
• Maximising the environmental, social and economic benefits of
the transition to net zero and Community Wealth Building.
• Continue to seek out opportunities to access ring fence funding
Page 236

Page 237

for levelling up projects i.e. through the UK Shared Prosperity
Fund, Just Transition Funding and Strategic Priorities Fund as
appropriate. 
Current performance: Strategic Community Plans including the
recently refreshed Moray Economic Strategy and a new Community
Wealth Building strategy present a clear vision of what is needed to
improve economic well – being, with a clear framework in place to
monitor actions and delivery plans. Alongside the Growth Deal, the
council and its partners are well placed to support economic activity in
the area.
Comments:  With work to support the economic recovery post -
pandemic substantially complete, the focus now is on delivering the
various strands of the revised economic strategy that underpins a key
priority of the Local Outcomes Improvement Plan – Developing a
Diverse, Inclusive and Sustainable Economy, and Building a Better
future for Young People. 
Page 237

Page 238

Page 238

Page 239

REPORT TO: CORPORATE COMMITTEE ON 29 AUGUST 2023 
SUBJECT: INFORMATION REPORT: SUNDRY DEBT WRITE-OFF
INFORMATION FOR 2023/2024 
BY:  CHIEF FINANCIAL OFFICER 
1. REASON FOR REPORT 
1.1 To inform the Committee of the details of Sundry Debt transactions, which are
written off during 2023/24 relating to invoices raised up to 31 March 2022. 
1.2 This report is submitted to Committee in terms of Section III B (1) of the
Council's Administrative Scheme relating to the regulation and management
of the Council’s finances according to policy. 
2. BACKGROUND 
2.1 The current Sundry Debt Management Procedures which include the
procedure on debt write off, were approved by Policy and Resources
Committee on 1 September 2015 (paragraph 9 of the Minute refers). Sundry
debts are defined as all amounts due to the Council with the exception of
Housing Rents, Non Domestic Rates and Council Tax. 
2.2 The process of writing off debts is an administrative exercise, which removes
the debts from the Council’s balance sheet but in practical terms still allows
the Council to pursue the debts until they can no longer be legally recovered
(time prescribed after 5 years).  Wherever possible collection processes
continue for debt which has been previously written off particularly where a
customer approaches the council for new chargeable services.  The old debt
has to be cleared before the new service can be delivered. 
2.3 The write off process only commences after all other avenues of recovery
have been exhausted. The other processes are detailed below: 
• First Council reminder (day 21)
• Second Council reminder (day 49)
• Referral to external debt collector (day 59)
• Further reminder letters
• Telephone contact
• Doorstep collection (where appropriate)
• Salary arrestment (where appropriate) Page 239

Page 240

• Court action (where appropriate) 
2.4 To avoid referring debt to the external debt collector a number of additional
actions are taken by Finance staff: 
• Instalment arrangements are offered when required
• Regular debt management information reports are produced for
departments to review
• Regular meetings are held with departments to discuss potential
defaulters.
• Regular contact with departments regarding sensitive debt (eg for
social care services). Departmental knowledge of their customers can
lead to recommendation for write off on economic grounds. The
majority of these are invoices for Social Care services. 
2.5 A summary of reasons for invoices being written off after the year end are
shown in the table below.  The value of debt written off has risen but
represents only 1.45% of the sundry debt raised during the year.  Future
reports will report the percentage of sundry debt written off as well as the
amounts written off.: 
Reason  Value (£)  Count
% of total
value
written off
% of total
number
written off
Department recommendation 18,606.59 67 8.39 6.49
Bankrupt/Sequestration 22.53 1 0.01 0.09
Gone Away 14,706.57 37 6.63 3.59
External debt collector
recommendation
188,482.58 927 84.97 89.83
Total 2023 221,818.27 1,032 100 100
Total 2022 184,257.61 745   
2.6 The same invoices have been analysed by service and are shown in the table
below. 
Service  Value (£)  Count
% of Total
Value
Written Off
% of Total
Number
Written Off
Corporate Services 225.10 3 0.10 0.29
Health & Social Care 45,332.73 332 20.44 32.17
Environmental Services 105,259.73 450 47.45 43.60
Educational Services 4,745.98 133 2.14 12.89
Housing & Property 31,888.19 98 14.38 9.50
Planning & Regulatory 34,366.54 16 15.49 1.55
Total 2023 221,818.27 1,032 100 100
Total 2022 184,257.61 745   
Page 240

Page 241

3. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) 
None directly relating to this report. 
(b) Policy and Legal 
The process employed to establish the debt for write off is prescribed by
the Council’s Debt Management Policy. 
The Council’s Financial Regulations state that the Chief Financial Officer
shall act on advice from the Head of Governance, Strategy and
Performance, external debt collectors and/or Sheriff Officers when
determining debts to be written off for accounting purposes. Details of
debts written off shall be retained for credit control purposes and to allow
the debts to be pursued at any stage until they become time prescribed.
(c) Financial implications
The financial implications are shown in paragraphs 2.5 and 2.6 but all
debts will continue to be pursued until the Council is legally prevented
from doing so. 
(d) Risk Implications 
Regular meetings are held with departments in order to identify and
contact defaulters quickly to reduce the Council’s exposure to unpaid
debt.  Any new information received by the Council is used to pursue the
debt until legally prescribed. 
(e) Staffing Implications 
None directly relating to this report. 
(f) Property 
None directly relating to this report. 
(g) Equalities/Socio Economic Impact 
None directly relating to this report. 
(h) Climate Change and Biodiversity Impacts 
No climate change or biodiversity implications have been determined for
this policy.
Page 241

Page 242

(i) Consultations 
The process of writing off invoices involves continuous consultation with
both the Council’s external debt collection agency and the relevant
service departments. 
5. CONCLUSION 
5.1 All debts will continue to be pursued until they can no longer be legally
recovered or it becomes uneconomic to pursue recovery. 
5.2 Debts amounting to £221,818.27 were considered to be sufficiently unlikely to
be recovered as to warrant being written off during 2023/24, which is to say
they are no longer included as debtors on the Council’s balance sheet. 
Author of Report: Daniel Littlewood, Assistant FMS & Banking Manager
Ref:    SPMAN-1293228629-932 
Page 242