Democracy Spraffa

Agenda Document Pack - Corporate Committee - 26/05/2026

Moray Council · 26 May 2026
Back to Corporate Committee — 26 May 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Corporate Committee 
Tuesday, 26 May 2026 
NOTICE IS HEREBY GIVEN that a Meeting of the Corporate Committee is to be held at
Council Chambers, Council Office, High Street, Elgin, IV30 1BX on Tuesday, 26 May
2026 at 09:30. 
BUSINESS 
1. Sederunt 
2. Declaration of Group Decisions and Members Interests * 
3. Minutes of meeting of 17 February 2026 7 - 12
4. Written Questions ** 
5. Performance Report - People Change and Community
Strategy - Period to March 2026
Report by Executive Director Finance, Strategy and Transformation  
13 - 22
6. Performance Report - Customer Experience ICT and Digital
Services - Period to March 2026
Report by Executive Director Finance, Strategy and Transformation  
23 - 32
7. Performance Report - Financial Services - Period to March
2026
Report by Executive Director Finance, Strategy and Transformation  
33 - 40
8. Performance Report - Governance - Period to March 2026
Report by Executive Director Economy, Enterprise and Operations  
41 - 46
Page 1

Page 2

9. Local Government Benchmarking Framework 2024-25
Results
Report by Executive Director Finance, Strategy and Transformation  
47 - 78
10. Health and Safety Annual Report 2025
Report by Executive Director Finance, Strategy and Transformation  
79 -
104
11. Employment Policy Framework 2025 26 Report
Report by Executive Director Finance, Strategy and Transformation  
105 -
114
12. 2025-28 Finance, Strategy and Transformation Service
Plans - Year 2 refresh
Report by Executive Director Finance, Strategy and Transformation  
115 -
152
13. 2025-28 Governance Service Plan - Year 2 refresh
Report by Executive Director Economy, Enterprise and Operations  
153 -
162
14. Corporate Transformation Strategy Development
Report by Executive Director Finance, Strategy and Transformation  
163 -
190
15. Best Value Action Plan Review and Progress Reporting
Report by Executive Director Finance, Strategy and Transformation  
191 -
220
16. Risk Appetite Statement
Report by Executive Director Economy, Enterprise and Operations  
221 -
230
17. Corporate Risk Register - April 2026 Update
Report by Executive Director Economy, Enterprise and Operations  
231 -
262
18. Information Reports - if called in 
Page 2

Page 3

Information Reports - Not for Discussion at this Meeting
Any member wishing to call in a noting or information report from one
meeting shall give notice to Committee Services by 12 noon 2 clear
working days before the meeting for which the report is
published.  Please see Standing Order 38 for deadlines. The Notice
shall be countersigned by one other elected member and shall explain
the reason for call in including any action sought.   
Information Report - Community Rental Support Annual
Review
Report by Executive Director Education, Housing and Communities  
263 -
272 
Information Report - Community Asset Transfers Annual
Report by Executive Director Education, Housing and Communities  
273 -
286 
Summary of Corporate Services Committee functions:
To regulate, manage and monitor the finances of the Council both capital
and revenue; to deal with staffing policies and practices other than for
teaching staff; to deal with equal opportunities policies and practices; to
deal with procurement policies and priorities; to deal with all matters
relating to the Council’s duty to initiate, maintain and facilitate
Community Planning; to ensure that the organisation, administrative and
management processes of the Council are designed to make the most
effective contribution to achieving the Council’s objectives; to provide all
central support services; to exercise the functions of the Council in
connection with the Registration of Births, Deaths and Marriages; to deal
with valuation and electoral registration matters.     
Watching the Meeting
You can watch the webcast live by going to:    
http://www.moray.gov.uk/moray_standard/page_43661.html    
Webcasts are available to view for 1 year following the meeting.  
You can also attend the meeting in person.  If you wish to attend
in person, please come to the High Street entrance door and a
member of staff will let you into the Chamber. 
Page 3

Page 4

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how the
individual or members of the group will vote on any item(s) of business on the
Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any relevant
and competent business within the specified remits not already on the agenda, to
the Chair provided it is received by the Proper Officer or Committee Services by
5pm three working days prior to the day of the meeting, please see Standing Order
36 for deadlines.  A copy of any written answer provided by the Chair will be
published on the Council’s committee management system by 12pm the day
before the meeting.  The Member who has put the question may, after the answer
has been published, may ask one supplementary question directly related to the
subject matter at the meeting, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the consent
of the Chair. If a Member does not have the opportunity to put a supplementary
question because no time remains, then he or she can submit it in writing to the
Proper Officer who will arrange for a written answer to be provided within 7
working days. 
Page 4

Page 5

MORAY COUNCIL 
Corporate Committee 
SEDERUNT 
Councillor Marc Macrae (Chair)
Councillor Kathleen Robertson (Depute Chair)  
Councillor Theresa Coull (Member)
Councillor John Cowe (Member)
Councillor Jérémie Fernandes (Member)
Councillor Donald Gatt (Member)
Councillor Sandy Keith (Member)
Councillor Elaine Kirby (Member)
Councillor Scott Lawrence (Member)
Councillor Paul McBain (Member)
Councillor Shona Morrison (Member)
Councillor Bridget Mustard (Member)
Councillor Derek Ross (Member)
Councillor Draeyk Van Der Horn (Member)
Councillor Ben Williams (Member)  
Clerk Name: Tracey Sutherland
Clerk Telephone: 07971 879268
Clerk Email: committee.services@moray.gov.uk 
Page 5

Page 6

Page 6

Page 7

MORAY COUNCIL 
Minute of Meeting of the Corporate Committee 
Tuesday, 17 February 2026 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor Theresa Coull, Councillor Jérémie Fernandes, Councillor Donald Gatt,
Councillor Sandy Keith, Councillor Elaine Kirby, Councillor Scott Lawrence, Councillor
Marc Macrae, Councillor Paul McBain, Councillor Shona Morrison, Councillor Bridget
Mustard, Councillor Kathleen Robertson, Councillor Derek Ross, Councillor Draeyk van
der Horn, Councillor Ben Williams 
Councillor Colyer was also in attendance. 
APOLOGIES 
Councillor John Cowe 
IN ATTENDANCE 
Chief Executive, Executive Director Economy, Enterprise and Operations, Executive
Director Finance, Strategy and Transformation, Chief Governance Officer (Monitoring
Officer), Chief Financial Officer, Head of Housing, Properties and Communities,
Head of Customer Experience, ICT and Digital Services, Head of People, Change and
Community Strategy, Service Manager Strategic Finance, Service Manager Property,
Estates and Assets and Service Manager Democratic Services.   
1.         Chair 
The meeting was chaired by Councillor Marc Macrae.  
2.         Declaration of Group Decisions and Members Interests 
In terms of Standing Orders 21 and 23 and The Councillors' Code of conduct the
Council noted that there were no declarations for Group Leaders or Spokesperson in
regard to any prior decisions taken on how members will vote on any item on the
agenda or any declarations of Member's interests in respect of any item on the
agenda.   
3.         Resolution 
The meeting resolved that in terms of Section 50A (4) and (5) of the Local Government
(Scotland) Act 1973, as amended, the public and media representatives be excluded
from the meeting for Item 13 of business on the grounds that it involves the likely
disclosure of exempt information of the class.  
Item 3.
Page 7

Page 8

Para number of
the minute Para number of Schedule 7a
13  
Para 4
Information relating to any particular applicant for, or recipient of
former recipient of, any service provided by the authority 
4.         Minutes of meeting of 4 November 2025 
The minute of the meeting of 4 November 2025 was submitted and approved.  
5.         Written Questions 
The Committee noted that no written questions had been submitted. 
6.         Revenue Budget Monitoring to 31 December 2025 
The meeting had before it a report by the Chief Executive advising Committee of the
revenue budget monitoring position as of 31 December 2025, Quarter 3 2025/26, and
the estimated outturn for the year.  
Following consideration, the Committee unanimously agreed to note:  
i) the revenue budget monitoring position to 31 December 2025, which shows
the Council is £5,102,000 over budget to date for 2025/26;     
ii)  that this position includes overspends in Education – Out of Area Placements
(£1,319,000), Financial Services (£112,000), Governance, Strategy and
Performance (£120,000), and Health and Social Care and Children’s Services
delivered on behalf of the Moray Integration Joint Board (£4,646,000); and
underspends within Education – Devolved School Budgets (£325,000),
Education, Resources and Communities (£76,000), Environmental and
Commercial Services (£166,000), and Economic Growth and Development
Services (£695,000);     
iii) the increase of £96,000 in the General Revenue Grant, as set out in paragraph
4.3;     
iv)  the current estimated outturn for 2025/26, which forecasts a net overspend of
£1,635,000, comprising projected overspends in Health and Social Care and
Children’s Services (£670,000 after the Moray Integration Joint Board cost-
sharing adjustment), Education (£1,751,000), Environmental and Commercial
Services (£400,000) and Financial Services (£452,000), partially offset by
underspends in Education, Resources and Communities (£298,000),
Economic Growth and Development Services (£810,000), and Loans Charges
(£573,000);     
v)  that Heads of Service have been tasked with reducing overspends and
identifying actions to bring the overall outturn position back into line with
budget; and
Page 8

Page 9

vi) that the projected variances within Provisions include amounts that will
require transfer to earmarked reserves at year end. 
Committee also agreed to approve the proposal to draw down £100,000 from the
Transformation Reserve to support the implementation of a new burial grounds
management system on a spend to save basis, as per paragraph 5.50.  
7.         Capital Plan 2025-2026 Quarter 3 
The meeting had before it, a report by the Chief Executive informing the Committee of
the expenditure to 31 December 2025 under the capital plan for financial year 2025/26
and to recommend budget adjustments for inclusion in the capital plan for 2026/27
and future years.  
Following consideration, the Committee unanimously agreed to note:  
i) expenditure to 31 December 2025 of £23,729,000 shown in Appendix I;    
ii) Appendix 2 - major capital projects spanning more than 1 financial year; and    
iii) the indicative affordability indicator of reach year of the three year 2025 - 2028
capital plan.  
8.         RIPSA Annual Report 
The meeting had before it a report by the Executive Director Economy, Enterprise and
Operations asking Committee to note the use made of covert surveillance and the
acquisition of communications data by Council employees in the course of their
duties over the reporting period.  
Following consideration, the Committee unanimously agreed to note the contents of
the report.  
9.         Corporate Transformation Strategy Development 
The meeting had before it, a report by the Executive Director Education, Housing and
Communities asking Committee to consider and note progress on the delivery of the
Council’s Transformation Strategy since the last annual report on 26 August 2025, as
part of the ongoing monitoring of progress.  
Following consideration, the Committee unanimously agreed to note the interim
update on the delivery of the Council's Transformation Strategy.  
10.         Performance Management Framework 
The meeting had before it, a report by the Executive Director Economy, Enterprise and
Operations asking Committee to consider and approve the revised Performance
Management Framework for the Council.  
Page 9

Page 10

Following consideration, the Committee unanimously agreed to approve the new
Performance Management Framework.  
11.         Best Value Action Plan Review and Progress Reporting 
The meeting had before it a report by the Executive Director Economy, Enterprise and
Operations asking Committee to note progress against the actions in the Best Value
Action Plan.  
Following consideration, the Committee unanimously agreed to note progress
against the actions in the Best Value Action Plan detailed in Appendix 1.  
12.         Review of Purpose and Remit of Joint Consultative Committee 
The meeting had before it, a report by the Executive Director Education, Housing and
Communities, asking Committee to consider and approve the proposed revised role,
purpose, constitution and name for the Joint Consultative Committee (JCC).  
Following consideration, the Committee unanimously agreed to approve the
proposed change to role, purpose, constitution and name to change from the Joint
Consultative Committee to Joint Consultative Forum.  
13.         Rent Rebate - Elgin [Para 4] 
The meeting had before it, a report by the Executive Director Education, Housing and
Communities inviting Committee to consider a request for a rent rebate in respect of
a property in Elgin.  
Councillor Keith moved that the rent rebate be given, this was seconded by
Councillor Fernandes as both felt the organisation was a valuable resource which
benefited many.  
In response, the Chief Financial Officer stated that if the rebate was given, it would be
a reduction in income for the Council and therefore a saving would need to be found
to cover the reduction.  
Councillor Macrae, seconded by Councillor Ross proposed accepting the
recommendations as printed, with Councillor Ross stating that it was on the
condition that no other similar organisation was receiving a rent rebate from the
Council. 
The Chief Governance Officer (Monitoring Officer) sought a short adjournment to
allow Officers and Councillors Keith and Fernandes to discuss the motion further.  
On the resumption of the meeting, the Chief Governance Officer (Monitoring Officer)
advised that the motion was not competent as it was not possible to determine where
the saving would be made to allow the rebate to be given.  He further advised that
Officers were confident that they could assist the organisation in finding ways to
access funding that would allow them to be able to pay the rent.  
Page 10

Page 11

In response, the Chair confirmed that he agreed with the advice given by the Chief
Governance Officer (Monitoring Officer) and stated that the motion was not
competent.  
In terms of Standing Order 65 Councillors Keith and Fernandes requested that their
dissent to be recorded.  
Following further consideration, the Committee agreed to refuse the application for a
rent rebate for the reasons set out in paragraph 6.1 of the report.   
Page 11

Page 12

Page 12

Page 13

Report to: Corporate Committee Meeting Date: 26 May 2026      
Report by: Executive Director Finance, Strategy and Transformation    
Author: Iain Sneddon Contact Email:  performance@moray.gov.uk  
Subject: Performance Report - People, Change and Community Strategy) – Period
to March 2026 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to scrutinise performance in areas of Service Planning,
Service Performance and other related data to the end of March 2026 and note actions
being taken to improve performance where required.  
1.2  This report is submitted to the Committee in terms of section III (A) (4) of the Council’s
Scheme of Administration to monitor performance in accordance with the Council’s
Performance Management Framework. 
2.  SUMMARY  
2.1  The report identifies the progress of Service Plan Actions and Performance Indicators
highlighting areas of good progress and areas where there have been challenges.
Mitigations and actions taken to address challenges are detailed within the body of the
report. 
Quarter 4 performance indicator results were not available at the time of reporting;
therefore, narrative relates to quarter 3 data. Service Plan action updates relate to end of
quarter 4. 
During the second half of 2025/26, one Strategic action was completed and further
progress was made across the programme. Of the 14 Service Level actions due by 31
March 2026, nine were completed, with the remaining five continuing beyond their original
timescales. A further seven actions remain in progress, with completion dates extending
to 31 March 2027. 
Item 5.
Page 13

Page 14

2.2  In response to questions around RAG tables and charts, an annotation prompt sheet
giving clarity on the data presented is available 
here.  
3.  RECOMMENDATIONS  
DUE DATE ACTIONS &
MILESTONES
ACTIONS &
MILESTONES
COMPLETE
Take a partnership approach to locality planning in
priority areas of Moray to enable people to influence
services and develop community action
30-Jun-2026 6 Actions
0 Milestones
1 Action
Complete 84%
Strategic Framework: Financial, Workforce, Digital,
Transformation Strategies.  Performance Management
Framework
31-Mar-2027 7 Actions
0 Milestones
2 Actions
Complete 72%
Youth Work 31-Mar-2026 2 Actions
0 Milestones 85%
Recruitment & Retention 31-Oct-2025 1 Action
0 Milestones
1 Action
Complete 100%
Organisational Development 31-Mar-2026 1 Action
0 Milestones 50%
Communication & Engagement 31-Mar-2026 1 Action
0 Milestones
1 Action
Complete 100%
Best Value Actions 30-Jun-2025 1 Action
0 Milestones 60%
Continuous Improvement 31-Oct-2025 1 Action
0 Milestones
1 Action
Complete 100%
Performance Management 31-Mar-2026 5 Actions
0 Milestones
5 Actions
Complete 100%
Health & Wellbeing 31-Mar-2026 2 Actions
0 Milestones 60%
Workforce Planning 31-Oct-2026 2 Actions
0 Milestones
1 Action
Complete 80%
Workforce Culture for Change 31-Mar-2027 1 Action 20%
31-Mar-2027 30 Actions 12 Actions
Complete 76%
Comment
As at the end of March, the proportion of planned work over the plan's period to April 2027 is 76% complete, noting most actions are
due to complete in the current year. RAG categorisation in the summary table is subjective based upon progress against individual
action lines, a link to the system generated report is provided at the top of this report  to allow for more scrutiny.
Data not available - Data not yet published or unavailable due to reporting timescales.
NUMBER OF
SERVICE PLAN PRIORITIES (Q4 2025/26) RAG
Service Plan Performance PIs chart presents the number of indicators and RAG status based on results against targets and aligns to
Service Plan Outcomes, whereas the Service Performance PIs chart reports on a set of operational service performance indicators not
covered by Service Plan priorities yet significant to service delivery, again based on results against targets, a link to the system
generated backing table is provided for more detailed scrutiny.
STRATEGIC
LEVEL
SERVICE
LEVEL
OVERALL PLAN PROGRESS
4 1 0 2 1
0 1 2 3 4 5 6 7 8
SERVICE PERFORMANCE INDICATORS Q3 Achieving Target Within Target Below Target Data Only Data not available
5 0 1 7 1
0 2 4 6 8 10 12 14
SERVICE PLAN PERFORMANCE INDICATORS Q3 Achieving Target Within Target Below Target Data Only Data not available
Page 14

Page 15

3.1  It is recommended that Committee:   
i) Scrutinises performance in areas of Service Planning, Service Performance and
other related data to the end of March 2026; and 
ii) note actions being taken to improve performance where required. 
Iain Sneddon
Research and Information Officer 
4.  BACKGROUND AND CONTEXT  
4.1  Each service plan sets out the planned strategic and service level priorities and outcomes
it intends to deliver in the coming year aligning closely with financial planning, corporate
and community planning partnership strategic priorities.   
4.2  Service Plan actions are weighted to reflect priority ratings.  Actions with higher priorities
receive greater weightings which contribute more to the overall delivery of the Plan. 
Progress on Service Plan priorities and outcomes and key areas of operational
performance is reported by exception, highlighting successes and giving assurances
around the challenges and actions to support. Links to Service Plan Actions, priority
ratings and weightings and Performance Indicators can be accessed within the
background papers section of this report.  
4.3  Progress on Service Plan priorities and outcomes and key areas of operational
performance is reported by exception, highlighting successes and giving assurances
around the challenges and actions to support.  Links to Service Plan Actions and
Performance Indicators can be accessed within the background papers section of this
report.  
4.4  Complaints are reported in terms of time taken to respond, outcomes and learning points. 
Links to Complaints tables can be accessed within the background papers section of this
report. 
4.5  Latest Local Government Benchmarking Framework (LGBF) results for 2024/25 are
published throughout the year with final refresh of data around June 2026.  The full suite
can be view via the LGBF Dashboard.  Published indicators for this service have been
incorporated with the relevant section of this report depending on whether used to
evidence progress against strategic, service level or service performance priorities.  LGBF
indicator targets and RAG status in the backing tables is now based on ranking thresholds
aligning with exception reporting.  
4.6  The Sustainable Development Statement was approved by the Corporate Committee on 5
November 2024 (para 16 of the Minute refers).  The Statement draws out the way in which
sustainable development is embedded in the Corporate Plan 2024-29 and wider corporate
policies, strategies, and plans with progress being reported through several updates and
reports, one of which is quarter 4 performance reporting.  Service Plan actions and
indicators that underpin the delivery of Sustainable Development Goals are highlighted in
the backing table documents and comment where relevant is incorporated in this report. 
An overview of progress will be presented in the annual Corporate Plan progress update.
Page 15

Page 16

5.  PROPOSALS   
Successes – Service Plan Strategic & Service Level Outcomes and operational
Service Performance 
5.1  The Public Service Improvement Framework (PSIF) programme is in place, with the cycle
of assessments embedded. The self-assessment is complete for the Economic Growth
and Development service complete. Processes are in place, and at different stages of
completion for Finance and Governance. Due to changes in Council organisation structure
the original timetable is subject to some slippage but on schedule to complete by summer
2026. Action GSP 2025-26 STRAT 1.2  
5.2  Following approval at Corporate Committee in June 2025, the revised Succession Planning
approach to recruitment and retention has been communicated and supporting
documentation provided. Awareness across Human Resources (HR) and Organisational
Development (OD) completed to support implementation across services. Information
from existing reporting methods and systems available have been confirmed which will 
enable the measurement/baseline to be established. Action HROD25-28 Serv 5.1  
5.3  Development work is now embedded into business as usual in terms of the
communications and engagement approach, including the implementation of the Moray
Engage platform and measures in place to monitor improvement. The revised 2026
engagement programme has been approved by the Corporate Leadership Team (CLT) The
Communications and OD teams will continue to operate closely together to ensure that
corporate and service priorities are central in all communication and engagement
activities. Questions were introduced in the Employee Survey 2025 to provide a baseline
for the measurement of the level of employee awareness of council priorities with 69%
indicating that they are familiar with the Council’s priorities and 62% responding that they
are aware of and understand the Council’s vision and values. Survey results showed that
from 2023 there is a 10% increase (73% to 83%) in awareness of the challenges which the
council faces over coming years and a 6% increase (73% to 79%) in understanding that the
council will have to change the way it delivers services because of these challenges.
Action HROD25-28 Serv 5.3  
5.4  All performance management Service Level Actions have now completed within agreed
timescales, four in quarters 3 and 4. The Local Outcomes Improvement Plan (LOIP)
delivery framework was agreed by the board in August with biannual reporting, with the
first performance report, for the period to 30 September, presented to the board on 26
November 2025. The redesign of Pentana (Service performance monitoring software) was
presented to the Extended Corporate Leadership Team (ECLT) on 23 February and ‘Soft
launch’ took place with services thereafter. Further development is ongoing with feedback
from services. With the implementation of ‘Moray Engage’ the use of ‘Survey Monkey’ has
been phased out with the contract ending 31 March 2026. The complaints system now has
a Child Friendly Complaints (CFC) marker added to the closure eForm demonstrating the
embedding of CFCs within the process. CFC training has been developed in house and
rolled out within the Services Complaint Administrator group. Further training is planned
to ensure all Complaint Administrators are familiar with the process. The Performance
Management Framework has been reviewed, submitted to the corporate committee on 17
February and approved. Actions GSP 2025-26 PM 1.2, 1.3, 1.4 & 1.5  
Page 16

Page 17

5.5  All elements to develop and improve knowledge and skills transfer across teams are now
complete. To ensure work is maintained, progress will continue to be monitored. The
Personal Discussion Group (PDG) been reviewed and first meeting of the new format was
held in quarter 4. Succession Planning measures are in place across the teams along with
support and development plans.  Action HROD25-28 Serv 5.7.2   
Challenges and actions to support – Service Plan Strategic and Service Level
Outcomes and operational Service Performance 
5.6  Most elements of supporting the New Elgin and Buckie areas through Locality Planning
have been achieved with the action achieving 94% completion. The action will be carried
forward to 2026/27 to complete outstanding work, with a revised completion date of 31
December 2026. In Buckie, the Monitoring Group has been reviewing and updating the
Action Plan to identify the priorities they could have a direct influence on. Funding secured
from Moray Communities Mental Health and Wellbeing fund has ensured continuity of the
Hub. A further funding application to Corra Foundation for Household Hardship funding
has also been successful to allow financial support to be made directly to individuals in
the community. The group is strengthening partnership work with Community Planning
partners to promote Buckie Engagement activity is planned to identify community-led
priorities, including public voting on improvement options. In New Elgin, the Link has
continued to grow, with a strong team of Volunteers that are central to designing and
delivering most community activities, including the expanding of the Saturday food larder
and the delivery of the Sunday family fun group and midterm family fun activities. Daily
groups run throughout the week supporting the community with a range of activities,
supported by partners. The first Health Issues in the Community (HIIC) course in Moray is
nearing completion, with students now working on a community project, and The Link also
offers CLD Adult & Family Learning, ASN support for pupils, and Digiknow digital support. 
Action STRAT ERC 1.1 25-28  
5.7  Good progress has been made in the further development of community engagement,
although not all objectives were complete by 31 March 2026. Work will continue on
engagement and consultation, with the service progressing the development of an
engagement and consultation strategy. Phase one of the learning estate consultation has
been completed, and the learning from this stage has been shared with relevant parties. A
workshop to build a shared understanding of learning estate challenges to shape the
sustainable future of the learning estate was held with elected members in March 2026,
with main objectives of testing and refining emerging themes and options, agree criteria
for prioritising both short and long-term interventions. The original completion date was
ambitious, and the work undertaken to complete phase one took longer than anticipated.
The remainder of work on the project will be carried forward into 2026/27 with a revised
completion date of 31 March 2027. Action STRAT ERC 1.2 25-28  
5.8  Good progress was made in establishing a leadership development programme to support
both corporate and individual development needs as part of the corporate management
restructure. Interim Phase 1 was completed, with sessions delivered in October 2025 and
February 2026, and a revised longer-term strategy and plan were developed following the
Leadership Forum session. The programme was paused while senior leadership vacancies
were recruited to ensure strong ownership and alignment for the next phase. With these
appointments now in place, the Head of People, Change and Community Strategy will take
the project forward with senior leaders, supported by a proposal for Phase 2 to be
considered by the Corporate Leadership Team (CLT).
Page 17

Page 18

5.9  All objectives to develop and implement a recruitment approach that addresses service
requirements and promote employment opportunities within the council did not complete
by 31 March due to senior leader vacancies in the service. The next phase will focus on
refining and implementing the recruitment strategy, strengthening employer branding, and
improving outcomes across priority service areas. Progress to date has focused on
strengthening the Council’s recruitment approach through both targeted senior
recruitment activity and the development of improved workforce intelligence. Discussions
with partners are ongoing to develop a plan for raising the profile for living and working in
Moray. Work will continue in 2026/27, with a revised completion date of 31 December
2026. Action HROD25-28 Strat 4.2  
5.10  Achieving all objectives to have recognised fair and competitive pay and conditions in
place proved challenging in the nine months’ timescale, with staffing and recruitment
being a contributory factor, leading to non-completion by 31 March 2026. Ongoing
monitoring of the Gender Pay Gap and wider equality indicators has been undertaken,
alongside completion of an assessment against the Scottish Government’s Minority
Ethnic Recruitment Toolkit, with improvement actions identified. The next phase will focus
on implementing identified improvement actions, strengthening data-driven insights, and
supporting measurable improvement in workforce equality outcomes and benchmarking
performance. Work to continue in 2026/27, with a revised completion date of 31
December 2026. Action HROD25-28 Strat 4.3  
5.11  At 95% complete, the implementation of actions to address issues arising from the
employee survey and workforce planning themes almost met all objectives by completion
date. Remaining activity will focus on completing service engagement, maintaining
momentum on delivery, and embedding ongoing monitoring through the performance
management framework. Action HROD25-28 Strat 4.5  
5.12  Targeted youth work sessions to address health and wellbeing issues and Employability,
whilst progressing well in 2025/26, was unable to complete by end of March 2026. There is
recognition that work needs to continue in 2026/27 with a revised completion date of 31
March 2027. Delivery of youth work in schools continues across all eight Associated
School Groups (ASGs).  Young people participating in these sessions report improved
levels of Health & Wellbeing, measured and monitored with Youth Work Outcomes and
Skills framework. Youth Work staff have trained in Health Issues in The Community
programme and are focussing on rolling out the programme in schools. Transition work
with primary seven (P7) pupils have been a large part of Youth Work delivery across Moray.
Supported by senior Elgin High school pupils and staff, over 60 P7s have attended weekly
youth club sessions with feedback from pupils, parents and staff being very positive.
Action SERV ERC 1.1 25-28  
5.13  The ambitious target to develop and implement initiatives creating a culture where
employees feel empowered, prepared and enabled to embrace change within a year, was
unable to complete by 31 March 2026. Progress slowed due to the impact of senior
recruitment. Information and analysis of the most current employees survey has been
shared with services and meetings have taken place with all heads of service to develop
quarterly surveys that will understand the organisation further. With continual council
transformation it is recognised that this action should be ongoing for the duration of the
Page 18

Page 19

plan, allowing for flexibility and adaptability in future years. Work will continue with a
revised completion date of 31 March 2028. Action HROD25-28 Serv 5.2  
5.14  The support of workforce related actions identified within the Best Value Action Plan are
significantly overdue for completion. Progress in advancing real-time workforce data has
been impacted by resource pressures associated with senior recruitment activity, with
limited progress made during the second half of 2025/26. Work should now accelerate,
with the next stage focussing on implementing agreed survey approaches, progressing
data capability, and supporting measurable improvement in leadership and workforce
outcomes. The action will be carried forward into 2026/27 with a revised completion date
of 31 December 2026. Action HROD25-28 Serv 5.4  
5.15  Work to revise and implement absence management procedures is well progressed but
failed to meet completion deadlines. An internal audit was undertaken to review the
Council’s sickness absence management arrangements with a final report being
submitted to the Audit and Scrutiny committee in November 2025. The audit identified
several areas where the Council promotes employee well-being and has established
policies and guidance for effectively managing sickness absence. However, analysis
shows that the average number of days lost through sickness absence per employee
within the Council has increased over recent years. Latest LGBF data shows that Moray
ranks as 23/32 for sickness absence days per employee (non-teacher) and 32/32 for
teacher absences. From 2021/22 both non-teacher and teacher absences have declined
in ranking by 13 places and 10 places respectively. Following approval at full council on 3
December 2025 (para 17 of the minute refers) work has progressed to deliver the
Improving Attendance project. People. The Project has moved into the early stages of
delivery, with a focus on establishing capacity, strengthening engagement with key
stakeholders and progressing priority actions. Two members of HR staff have been
recruited and will commence in April. This additional capacity will enable the project to
progress to the next phase and support delivery of the approved actions. Work will
continue into 2026/27 with a revised completion date of 31 March 2027, thereafter, work
will continue to monitor progress and implement any necessary amendments, ensuring
absence is effectively monitored and managed. Action HROD25-28 Serv 5.6.1, PIs
CORP06a and CORP06b  
5.16  Work to review measures to reduce absence and strengthen support for managing
violence and aggression in schools did not meet all objectives by 31 March 2026. By the
end of quarter 3, 2,922 violence and aggression incidents had been recorded, 13% higher
than the same period in 2024/25 (2,575), with 84% occurring in education settings. In
response, Education continues to lead targeted work to improve staff safety and support
positive behaviour, informed by both local data and national learning. While the national
trend is also reflected in Moray, the data shows that most incidents involve a relatively
small number of pupils. Improved reporting is providing better insight and is helping to
shape action through a joint working group with officers and trade unions. Early progress is
encouraging: A new partner group has been set up to monitor data and the move from BSS
to CALM is showing a reduction in incidents so far this year, staff feedback has been
positive, CIRCLE is being rolled out across the service, and ASN outreach teams are
targeting support where it is most needed. The next phase will focus on full
implementation of the project, embedding preventative measures, and working with Trade
Unions and services to secure sustained improvements in attendance and staff wellbeing.
The action will carry forward into 2026/27, with a revised completion date of 31 March
Page 19

Page 20

2027, and monitoring and support will continue beyond that point. HROD25-28 Serv 5.6.2
PI HROD006 
Local Government Benchmarking Performance indicators
5.17  The proportion of the highest paid 5% of employees who are women has increased by
1.1% since 2023/24. At 62.3% Moray is placed within the top quartile 8/32 and 3/8 within
our comparator group. From being ranked 20/32 in 2019/20 Moray has made significant
progress. The long-term trend is on an upward trajectory across Scotland. PI CORP3b  
5.18  Although consistently improving the (Local Authority) gender pay gap in Moray at 4% is
ranked 29/32 nationally and 7/8 amongst comparators, placing Moray in the bottom
quartile. Historically Moray has always been placed in the bottom quartile. Since the base
year of 2015/16 Moray has witnessed a greater improvement (-5%) in comparison with
both Scotland (-3.1%) and comparator average (-2%).   
Complaints and MP/MSP Enquiries
5.19  Between 1 October 2025 and 31 March 2026, four complaints were received and two were
closed, both at frontline stage. 
5.20  Two MSP enquiries were received over the period. One related to clarification of Neonatal
Care leave policy and the other related to question regarding the hiring of staff from
outside the UK.   
Case Studies
5.21  Nothing to report   
Consultation and Engagement
5.22  Nothing to report  
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) X 
Policy and Legal  X
Financial  X
Risk  X
Staffing  X
Best Value and Transformation X 
Property  X
Information Communications Technology/Digital  X
Equalities. Social Inclusion and Economic Impact   X
Climate Change and Biodiversity Impact  X 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Page 20

Page 21

Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☒ Improving wellbeing of our population   
6.3  Policy and Legal 
The Council has a statutory requirement to publish a range of information that will
demonstrate that it is securing best value and assist in comparing performance both over
time and between authorities where appropriate.  
6.4  Financial 
There are none arising from this report. 
6.5  Risk 
There are none arising from this report.  
6.6  Staffing 
There are none arising from this report.  
6.7  Best Value and Transformation 
How councils plan for, manage and report on performance is a key area of focus in
external audit work, particularly on best value.  
6.8  Property 
None arising from this report.  
6.9  Information Communications/Technology/Digital 
None arising from this report.  
6.10  Equalities, Social Inclusion and Economic Impact 
An Equality Impact Assessment is not required as this report is to inform the Committee
on performance.  
6.11  Climate Change and Biodiversity Impacts 
None arising from this report. 
7.  CONSULTATION  
Page 21

Page 22

7.1  This report has been prepared in consultation with the Executive Director Finance,
Strategy and Transformation, Service Managers, and Tracey Sutherland, Service Manager
Democratic Services and any comments made have been incorporated into the report 
8.  BACKGROUND PAPERS  
8.1  Service Plan Actions
Performance Indicators
Service Performance Indicators
Service Complaints 
Page 22

Page 23

Report to: Corporate Committee Meeting
Date:
26 May 2026  
Report by: Executive Director Finance, Strategy and Transformation 
Author: Neil Stables Contact
Email:
performance@moray.gov.uk 
Subject: Performance Report - Customer Experience, ICT and Digital Services –
Period to March 2026 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to scrutinise performance in areas of Service Planning,
Service Performance and other related data to the end of March 2026 and note
actions being taken to improve performance where required.  
1.2  This report is submitted to Committee in terms of Section III (A) (4) of the Council’s
Scheme of Administration to monitor performance in accordance with the
Council’s Performance Management Framework.  
2.  SUMMARY  
2.1  At the end of March 2026, the Customer Experience, ICT and Digital Services
Service Plan was 66% complete.  Progress against Service Plan Priorities and
Indicators and operational Service Performance Indicators is presented in the table
and charts below. 
Item 6.
Page 23

Page 24

2.2  In response to questions around RAG tables and charts, an annotation prompt
sheet giving  clarity on the data presented is available here. 
Page 24

Page 25

3.  RECOMMENDATIONS  
3.1  It is recommended that Committee: 
i) scrutinises and notes performance in areas of Service Planning,
Service Performance and other related data to the end of March 2026;
and   
ii) notes actions being taken to improve performance where required. 
Neil Stables
Research and Information Officer 
4.  BACKGROUND AND CONTEXT  
4.1  Each service plan sets out the planned strategic and service level priorities and
outcomes it intends to deliver in the coming year aligning closely with financial
planning, corporate and community planning partnership strategic priorities.   
4.2  Service Plan actions are weighted to reflect priority ratings.  Actions with higher
priorities receive greater weightings which contribute more to the overall delivery of
the Plan.  Progress on Service Plan priorities and outcomes and key areas of
operational performance is reported by exception, highlighting successes and
giving assurances around the challenges and actions to support. Links to Service
Plan Actions, priority ratings and weightings and Performance Indicators can be
accessed within the background papers section of this report.  
4.3  Complaints are reported in terms of time taken to respond, outcomes and learning
points.  Links to Complaints tables can be accessed within the background papers
section of this report. 
4.4  Latest Local Government Benchmarking Framework (LGBF) results for 2024/25 are
published throughout the year with final refresh of data around June 2026.  The full
suite can be viewed via the LGBF Dashboard.  Published indicators for this service
have been incorporated with the relevant section of this report depending on
whether used to evidence progress against strategic, service level or service
performance priorities.  LGBF indicator targets and RAG status in the backing tables
is now based on ranking thresholds aligning with exception reporting. 
4.5  The Sustainable Development Statement was approved by the Corporate
Committee on 5 November 2024 (para 16 of the Minute refers).  The Statement
draws out the way in which sustainable development is embedded in the Corporate
Plan 2024-29 and wider corporate policies, strategies, and plans with progress
being reported through several updates and reports, one of which is quarter 4
performance reporting.  Service Plan actions and indicators that underpin the
delivery of Sustainable Development Goals are highlighted in the backing table
documents and comment where relevant is incorporated in this report.  An
Page 25

Page 26

overview of progress will be presented in the annual Corporate Plan progress
update. 
5.  PROPOSALS  
Successes – Service Plan Strategic & Service Level Outcomes and operational
Service Performance
5.1  Work to develop and expand the Council’s digital approach is reported at 80%
complete against a due date of March 2027.  Over the last six months there has
been further expansion of the digital approach with the development or update of
public facing forms going live including short term let renewals, custom transport
bookings and non-domestic rates enquiries.  Work also continues within the
council with completion of the Interchange Policies A-Z search function, further
progress with Sharepoint Online implementation and the migration of the website
to Umbraco.  Trialling of Copilot for Microsoft 365 will conclude at the end of June
2026, where a review of the pilot will be undertaken looking at the justification to
continue and enhance usage.  (Strategic Level Action ICT25-28 Strat 4.1) 
5.2  The project to provide emergency out-of-hours (OOH) support to Moray Council has
successfully been completed. Initial complications with the intended supplier were
resolved, with the Corporate committee approving an alternative supplier that met
all necessary deadlines. The service went live on 30th June. The transition has been
seamless, in part due to project team engaging with services and developing clear
process maps of all OOH scenarios. (Service Plan Action GSP 2025-26 DT&E 1.2) 
5.3  The review of Council business system estate has been complete, although there
was some difficulty getting responses from services which were unsure of their
responsibility for systems.  A comprehensive list of all known systems has now
been documented, this will pave the way for work to be done with Business
Continuity / Risk Management to review the digital resilience of the information
systems.  Any systems which have not been identified as part of the initial review
will be added to the list and reviewed accordingly. (Service Level Action ICT25-28
Serv 5.4.1) 
Challenges and actions to support – Service Plan Strategic & Service Level
Outcomes and operational Service Performance
5.4  A draft Data Strategy and Action Plan has been developed however there has been
limited progress over the last six months as the Council await further update from
Scottish Government regarding the Data Maturity programme “lite”.   Discussions
took place with Scottish Government regarding their Data Maturity programme, a 6-
month programme to help organisations such as Moray Council to improve data
capabilities.  Interest has been registered for Moray Council to be early adopter of
the Scottish Governments new shortened Data Maturity Assessment, however, to
date no progress has been made.  Further discussions with Scottish Government
are being sought to help in developing a progression plan.  In the meantime, digital
teams have been working with the Service Manager for Benefits and Money
Advice regarding the adoption of the SAVVI data sharing framework and the Low
Page 26

Page 27

Income Family Tracker (LIFT) to create a corporate, ethical, and intelligence led
approach for identifying and supporting vulnerable households. These tools will
strengthen lawful data sharing, improve integration and data quality, and enable
proactive, evidence based interventions to reduce child poverty and financial
hardship.   This action will be carried forward to the 2026/27 Service Plan. 
(Strategic Level Action ICT25-28 Strat 4.2) 
5.5  The three major projects for the ICT Infrastructure Team have been Mobile Device
Management (MDM), Public Switched Telephone Network (PTSN) shutdown, and
Scottish Wide Area Network (SWAN) 2, with the latter two being national
programmes. The delivery schedule for MDM was significantly delayed but the
project has now been delivered and within budget. SWAN 2 slipped its indicative
target of December 2025, however has been successfully completed before the
end of the reporting year – timescales for the project were impacted by third party
delays. Work continues to progress on the PSTN shutdown and is on track to finish
before analogue services are switched off in January 2027, this will be reported
against in the 2026/27 Action Plan.  (Strategic Level Action ICT25-28 Strat 4.2 /
Service Level Action ICT25-28 5.8.1). 
5.6  Work was undertaken over the last three months to provide some analysis of the
existing ICT asset estate and the anticipated associated costs. This will be taken
forward at ECLT in the very near future with a view to setting out an investment
proposal to refresh the existing assets.  This work will feed into the refresh of the
Education ICT strategy which is included on the 2026/27 Customer Experience, ICT
and Digital Service Service Plan.  (Strategic Level Action ICT25-28 Strat 4.2) 
5.7  Introduction of a new Customer Relationship Management (CRM) solution to
improve customer experience through a more accessible and efficient online
service to the public has not been completed this year, however significant work
has been undertaken, and revised milestones have been set for the new system to
go live in November 2026.  The project team has completed all required training and
are now ‘Certified Builders”.  Alongside the build process there will be several
technical workshops such as data cleaning and migration, as well as engagement
workshops to ensure the new system is ready to go live in November.   (Service
Level Action DT&E 2025-26 1.1) 
5.8  Team Leaders continue to manage absence in line with Health and Work policy,
liaising with HR as appropriate. The majority of absences are short term. Power BI
absence data is not granular enough to provide meaningful analysis; this will be
raised at the Workforce Planning meeting with HR. A bespoke absence
management session with HR Adviser is still outstanding.  This action will continue
in the 2026/27 Service Plan. (Service Level Action ICT25-28 Serv 5.7). 
5.9  The rate of online staff completing e-learning modules continues to remain low,
with 33% having completed the training module over quarter 4.  While the uptake
for the first course of 2026 is low, not all reminders have been exhausted.  The
Cyber Resilience and Information Security Team have amended the schedule for
Page 27

Page 28

awareness training to avoid the holidays periods to see if this has a positive impact. 
Once the course has been closed uptake will be reported back to ECLT with a view
to identifying options to increase uptake going forward.  (Service Plan Performance
Indicator ICT003) 
5.10  Over the course of 2025/26, just under 127,000 calls were received by the
Customer Services Call Centre at an average of around 10,580 calls per month. 
The call centre answered 83.1% of calls during the year, an improvement on the
81.9% recorded in 2024/25, however below the target of 93%.  Performance in
quarter 4 (79.1%) impacted the overall performance for the year, this was due to a
significant increase in calls.  Multiple storms during the period impacted on both
waste and roads calls with grit bins, road gritting, streetlighting and bin collections
the top reasons for these calls, and issues with accessing online annual billing
services and making payments for Council Tax also saw a spike in customer calls.
The graph below shows the quarterly call volume and answer rates over the last
three years.   
Of the calls answered during 2025/26, 56.3% were answered within the 60 seconds
target, a reduction on the 58.3 % recorded in 2024/25.  Improvements in
performance were made across quarters 1 to 3, however the increase in calls in
quarter 4 (as noted above) impacted the answer rates with only 48.2% of calls
answered being answered within the 60 second target.  The graph below shows the
quarterly performance over the last three years. (PIs: CPS058 and CPS058a) 
Page 28

Page 29

Complaints and MP/MSP Enquiries
5.11  In line with the Performance Management Framework, complaints are reviewed
quarterly by departmental management in terms of time taken to respond,
outcome and learning points.  Detailed tables can be accessed within the
Background Papers section of this report. 
5.12  A total of two complaints were received during the period January to March 2026,
with one complaint being closed.  The complaint was dealt with at frontline stage
and was not upheld.  For the reporting year Customer Experience, ICT and Digital
Services responded to four complaints, all at frontline stage with an average
response time of 3 days.  All four complaints were for Customer Services, with two
upheld, one partial upheld and one not upheld.  Of the three complaints upheld,
two were for delays in responding to customer enquiries and one for the tone of
response.  Apologies were given and restorative action taken, which complainants
accepted.   
5.13  No MSP/MP enquiries were received over the course of 2025/26. 
Other Performance (not included in the Service Plan)
5.14  Nothing to report. 
Consultation and Engagement
5.15  Nothing to report. 
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the
recommendations are agreed: 
SUBJECT YES NO
Page 29

Page 30

Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  X
Policy and Legal  X
Financial  X
Risk  X
Staffing  X
Best Value and Transformation  X
Property  X
Information Communications Technology/Digital  X
Equalities. Social Inclusion and Economic Impact   X
Climate Change and Biodiversity Impact  X 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through
Best Value, will better enable the Council to fulfil the ambitions set out in its
strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following
Council Plan strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report
support and contribute to improved outcomes for communities as outlined in
the following local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population 
6.3  Policy and Legal 
The Council has a statutory requirement to publish a range of information that will
demonstrate that it is securing best value and assist in comparing performance
both over time and between authorities where appropriate.  
6.4  Financial 
None arising from this report. 
6.5  Risk 
None arising from this report.  
6.6  Staffing 
None arising from this report.  
6.7  Best Value and Transformation
Page 30

Page 31

How councils plan for, manage and report on performance is a key area of focus in
external audit work, particularly on best value.  
6.8  Property 
None arising from this report.  
6.9  Information Communications/Technology/Digital 
None arising from this report.  
6.10  Equalities, Social Inclusion and Economic Impact 
None arising from this report.  
6.11  Climate Change and Biodiversity Impacts 
None arising from this report. 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with the Head of Customer
Experience, ICT and Digital Services and relevant Service Managers and any
comments made have been incorporated. 
8.  BACKGROUND PAPERS  
8.1  Service Plan Actions
Service Plan Performance Indicators 
Service Performance Indicators
Service Complaints 
Page 31

Page 32

Page 32

Page 33

Report to: Corporate Committee Meeting Date: 26 May 2026  
Report by: Executive Director, Finance Strategy and Transformation 
Author: Suzanne Wilson Contact
Email:
performance@moray.gov.uk 
Subject: Performance Report - Financial Services – Period to March 2026 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to scrutinise performance in areas of Service
Planning, Service Performance and other related data to the end of March 2026
and note actions being taken to improve performance where required.  
1.2  This report is submitted to Committee in terms of Section III (A) (4) of the
Council’s Scheme of Administration to monitor performance in accordance with
the Council’s Performance Management Framework.  
2.  SUMMARY  
2.1  At the end of March 2026, actions relating to the Financial Services Service
Plan for 2025-28 was 68% complete.  Progress against Service Plan Priorities
and operational Service Performance Indicators is presented in the table and
charts below. 
2.2  In response to questions around RAG tables and charts, an annotation prompt
sheet giving clarity on the data presented is available here. 
Item 7.
Page 33

Page 34

3.  RECOMMENDATIONS  
3.1  It is recommended that Committee; 
i) scrutinises and notes performance in areas of Service Planning,
Service Performance and other related data to the end of March
2026; and   
ii) notes actions being taken to improve performance where required. 
Suzanne Wilson
Research and Information Officer 
Page 34

Page 35

4.  BACKGROUND AND CONTEXT  
4.1  Each service plan sets out the planned strategic and service level priorities
and outcomes it intends to deliver in the coming year aligning closely with
financial planning, corporate and community planning partnership strategic
priorities.   
4.2  Service Plan actions are weighted to reflect priority ratings.  Actions with higher
priorities receive greater weightings which contribute more to the overall
delivery of the Plan.  Progress on Service Plan priorities and outcomes and key
areas of operational performance is reported by exception, highlighting
successes and giving assurances around the challenges and actions to
support.  Links to Service Plan Actions, priority ratings and weightings and
Performance Indicators can be accessed within the background papers
section of this report.  
4.3  Complaints are reported in terms of time taken to respond, outcomes and
learning points.  Links to Complaints tables can be accessed within the
background papers section of this report. 
4.4  Latest Local Government Benchmarking Framework (LGBF) results for 2024/25
are published throughout the year with final refresh of data around June 2026. 
The full suite can be viewed via the LGBF Dashboard.  Published indicators for
this service have been incorporated with the relevant section of this report
depending on whether used to evidence progress against strategic, service
level or service performance priorities.  LGBF indicator targets and RAG status
in the backing tables is now based on ranking thresholds aligning with
exception reporting. 
4.5  The Sustainable Development Statement was approved by the Corporate
Committee on 5 November 2024 (para 16 of the Minute refers).  The Statement
draws out the way in which sustainable development is embedded in the
Corporate Plan 2024-29 and wider corporate policies, strategies, and plans
with progress being reported through several updates and reports, one of
which is quarter 4 performance reporting.  Service Plan actions and indicators
that underpin the delivery of Sustainable Development Goals are highlighted in
the backing table documents and comment where relevant is incorporated in
this report.  An overview of progress will be presented in the annual Corporate
Plan progress update. 
5.  PROPOSALS  
Successes – Service Plan Strategic and Service Level Outcomes and
operational Service Performance
5.1  Capital monitoring has been strengthened with the introduction of revised
automated monthly monitoring reports.  These reports were operational for the
start of the 2026/27 financial year with success to be demonstrated through
Page 35

Page 36

lower level of slippage at year end and more accurate forecasting of capital
spend. (Strategic Level Action FIN25-28 Strat 4.1.1)  
5.2  Work to implement recommendations from the 2024/25 Annual Audit Report is
complete ahead of schedule and closed by Auditors.  Authorisation controls
for GL Journals have been implemented, and reconciliation of Property, Plant
and Equipment (PPE) has been reviewed.  Fixed asset verification is now
undertaken as business as usual while a review of assets under construction
identified no issues requiring further action.  (Service Level Action FIN25-28
5.3) 
5.3  To strengthen Financial Sustainability measures, a new indicator that focuses
on the reliance of reserves to bridge budget gaps has been introduced by the
LGBF.  In 2024/25, Moray is one of eight authorities reporting a 0% reliance. 
(LGBF PI FINSUS06)   
Challenges and actions to support – Service Plan Strategic and Service
Level Outcomes and operational Service Performance
5.4  Participatory Budgeting (PB) work has continued, with Accountancy now
liaising directly with services to capture community led decision making
activity.  While overall spend remains below target, £901,000 (38.5%) of the
£2,339,000 council budget subject to PB has been attributed, the highest
proportion achieved to date.  Further development of PB is included in the
2026/27 Year 2 refresh of the Service Plan.  (Strategic Level Action FIN25-28
Strat 4.2, Strategic Level PIs, FS215, FS214 and ERC006a) 
5.5  Work to progress the Procurement Action Plan and implement actions within
the Corporate Asset Management Plan has been affected by staff absence and
other work priorities.  Both will be carried forward into the Service Plan Year 2
refresh. (Service Level Actions FIN25-28 Serv 5.2 and 5.4) 
5.6  Due to other priorities, including annual billing work, progress to streamline
and digitise council tax and non-domestic billing has been limited.  Initial
discussions have taken place with both ICT and the software provider and this
action will be carried forward into the Service Plan Year 2 refresh. (Service
Level Action FIN25-28 Serv 5.5) 
5.7  Published LGBF data for 2024/25 shows the proportion of invoices sampled
and paid within 30 days remains relatively unchanged at 89.5%.  In terms of
ranking, Moray continues to be within the lowest quartile, placed 27th out of 32
authorities against a national average of 93.1%.  With a family group average of
88.7%, Moray ranks 5th out of 8 comparator authorities.  Work to increase
efficiency and replace the Financial Management System is underway, with
anticipated delivery by April 2028.  Meantime, services are reminded to
process invoices promptly.  (LGBF PI CORP8) 
Page 36

Page 37

5.8  Total useable reserves as a percentage of council annual budgeted revenue
provide an indication of a Council’s financial resilience and its capacity to
respond to unforeseen events.  Over the past three years, Moray’s usable
reserves have declined.  Latest data places Moray 25th out of 32 authorities
with 13.8% of useable reserves against a national average of 20.5%.  Within the
family group, Moray is ranked 6th out of 8, against a comparator average of
18.1%.  However, with a 0% reliance on reserves reported in 2024/25
(paragraph 5.3) and balanced budgets approved for both 2025/26 and 2026/27,
£6million in reserves is available if required.  Budget has also been earmarked
for transformational change projects that aim to improve efficiency and
effectiveness of the council over the longer term.  (LGBF PI FINSUS01) 
5.9  The ratio of financing costs to net revenue stream is one of the Prudential
Indicators published during the budget setting process.  It measures the
proportion of budget required to meet financing costs.  For General Services,
the ratio compares borrowing financing costs with net expenditure funded by
government grant and local taxpayers.  At 10.8%, Moray ranks 31st out of 32
authorities, against a national average of 6% and 8th out of 8 within its family
group where the average is 6.3%.  The breach of 10% can be attributed to the
introduction of the accounting standard IFRS 16 Leases in April 2024, which
brings costs previously treated as service expenditure into financing costs. 
This has now been incorporated into future estimates.  The capital budget set
for 2026/27 continued to use a capping mechanism to ensure the future ratio
remained with the 10% threshold. Going forward, estimated ratios for General
Services reflect the ongoing requirement to increase borrowing to fund capital
expenditure particularly within the Learning Estate, Libraries and Leisure
Estate and the Moray Growth Deal.  A review of the long-term financing strategy
is also planned for 2026.  (LGBF PI FINSUS03) 
Complaints and MP/MSP Enquiries
5.10  During the second half of 2025/26, 16 complaints were closed by Financial
Services: 12 at Frontline and four as Investigative.  The average response time
for Frontline complaints was marginally above the five-day target while
Investigative complaints met the 20-day target with an average response time
of 18.25 days. 
5.11  Three complaints were upheld and six partially upheld: eight related to council
tax with one for payments.  All complaints were the result of either procedural
errors or communication issues.  Learning outcomes include revision of
procedures and reinforcement of existing regulations or customer care
standards. 
5.12  Across the whole year, a total of 14 complaints relating to council tax were
upheld or part upheld.  During the same period, 21,920 council tax queries
were dealt with by the service. 
Page 37

Page 38

5.13  Eight MP/MSP enquiries were received during the second half of the year.  All
related to various issues around council tax or benefits. 
Other Performance (not included in the Service Plan)
5.14  Nothing to report. 
Case Studies
5.15  Nothing to report. 
Consultation and Engagement
5.16  Budget Managers were recently invited to complete a survey covering areas
such as the Financial Management System, contact with Accountancy, budget
monitoring and expenditure and training needs.  Feedback received will be
used to inform and support ongoing improvements to the Accountancy
service. 
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the
recommendations are agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  X
Policy and Legal  X
Financial  X
Risk  X
Staffing  X
Best Value and Transformation  X
Property  X
Information Communications Technology/Digital  X
Equalities. Social Inclusion and Economic Impact   X
Climate Change and Biodiversity Impact  X 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP))
Improved Collaborative Leadership, as part of continuous improvement
through Best Value, will better enable the Council to fulfil the ambitions set
out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the
following Council Plan strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
Page 38

Page 39

b) Links to Local Outcomes Improvement Plan – The proposals in this report
support and contribute to improved outcomes for communities as
outlined in the following local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in  
Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population 
6.3  Policy and Legal 
The Council has a statutory requirement to publish a range of information that
will demonstrate that it is securing best value and assist in comparing
performance both over time and between authorities where appropriate.  
6.4  Financial 
None arising from this report.  
6.5  Risk 
None arising from this report.  
6.6  Staffing 
None arising from this report.  
6.7  Best Value and Transformation 
How councils plan for, manage and report on performance is a key area of
focus in external audit work, particularly on best value.  
6.8  Property 
None arising from this report.  
6.9  Information Communications/Technology/Digital 
None arising from this report.  
6.10  Equalities, Social Inclusion and Economic Impact 
None arising from this report.  
6.11  Climate Change and Biodiversity Impacts 
None arising from this report. 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with the Head of Financial
Services, relevant Service Managers and Caroline O’Connor, Committee
Services Officer and any comments made have been incorporated. 
8.  BACKGROUND PAPERS  
Page 39

Page 40

8.1  Service Plan Actions
Service Plan Performance Indicators
Service Performance Indicators 
Service Complaints 
Page 40

Page 41

Report
to:
Corporate Committee Meeting Date: 26 May 2026  
Report
by:
Executive Director Economy, Enterprise and Operarions    
Author: Neil Stables Contact Email:  performance@moray.gov.uk 
Subject: Performance Report - Governance – Period to March 2026 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to scrutinise performance in areas of Service Planning,
Service Performance and other related data to the end of March 2026 and note actions
being taken to improve performance where required.  
1.2  This report is submitted to the Committee in terms of section III (A) (4) of the Council’s
Scheme of Administration to monitor performance in accordance with the Council’s
Performance Management Framework. 
2.  SUMMARY  
2.1  At the end of March 2026, overall progress against the Governace 2025/26 Service Plan was
77% complete.  Progress against Service Plan Priorities and operational Service
Performance Indicators is presented in the table and charts below. 
Item 8.
Page 41

Page 42

2.2  In response to questions around RAG tables and charts, an annotation prompt sheet giving
clarity on the data presented is available here. 
3.  RECOMMENDATIONS  
3.1  It is recommended that Committee: 
i) scruitinises and notes performance in areas of Service Planning, Service
Performance and other related data to the end of March 2026; and   
ii) note actions being taken to improve performance where required. 
Neil Stables
Research and Information Officer 
4.  BACKGROUND AND CONTEXT  
4.1  Each service plan sets out the planned strategic and service level priorities and outcomes
it intends to deliver in the coming year aligning closely with financial planning, corporate
and community planning partnership strategic priorities.   
4.2  Service Plan actions are weighted to reflect priority ratings.  Actions with higher priorities
receive greater weightings which contribute more to the overall delivery of the
Page 42

Page 43

Plan.  Progress on Service Plan priorities and outcomes and key areas of operational
performance is reported by exception, highlighting successes and giving assurances
around the challenges and actions to support. Links to Service Plan Actions, priority
ratings and weightings and Performance Indicators can be accessed within the
background papers section of this report.  
4.3  Complaints are reported in terms of time taken to respond, outcomes and learning points. 
Links to Complaints tables can be accessed within the background papers section of this
report. 
4.4  Latest Local Government Benchmarking Framework (LGBF) results for 2024/25 are
published throughout the year with final refresh of data around June 2026.  The full suite
can be view via the LGBF Dashboard.  Published indicators for this service have been
incorporated with the relevant section of this report depending on whether used to
evidence progress against strategic, service level or service performance priorities.  LGBF
indicator targets and RAG status in the backing tables is now based on ranking thresholds
aligning with exception reporting.  
4.5  The Sustainable Development Statement was approved by the Corporate Committee on 5
November 2024 (para 16 of the Minute refers).  The Statement draws out the way in which
sustainable development is embedded in the Corporate Plan 2024-29 and wider corporate
policies, strategies, and plans with progress being reported through several updates and
reports, one of which is quarter 2 performance reporting.  Service Plan actions and
indicators that underpin the delivery of Sustainable Development Goals are highlighted in
the backing table documents and comment where relevant is incorporated in this report. 
An overview of progress will be presented in the annual Corporate Plan progress update. 
5.  PROPOSALS   
Successes – Service Plan Strategic & Service Level Outcomes and operational
Service Performance
5.1  Absence review meetings have been held in line with policy and appropriate actions have
been taken to manage any risk.  Absence levels have remained low throughout the year
within Governance services, with an absence rate of 1.2% in quarter 3 against a Council
average of 6.2%.  Absence will continue to be actively managed in line with policy. (Action
– GSP 2025-26 H&WB 1.1 / PI – H&WBGOV1.2)   
Challenges and actions to support – Service Plan Strategic & Service Level Outcomes
and operational Service Performance
5.2  Grading discussions around Legal Service solicitor posts have been completed, with
vacant posts being advertised.  Next steps will be dependent on the uptake of posts,
however the action will continue to be monitored and reported against in the 2026/27
Service Plan. Outsourcing and monitoring of spend will also continue to be reviewed.
(Action – GSP 2025-26 LS 1.1)  
5.3  As part of ensuring business continuity arrangements are fully in place across critical
services the Corporate Leadership Team has sent reminders out to services with
outstanding plans.  The action completion date has been revised to June 2026 to fall in line
with the Best Value Action plan. Work will continue to be monitored through the Best Value
Action Plan. (Action – GSP 2025-26 IG 1.1)
Page 43

Page 44

5.4  The percentage of committee draft minutes issued within the 5 working day target has
steadily increased over the year, rising from 55.6% (10 out of 18) in quarter 1 to 76.9% (10
out of 13) issued within timescale in quarter 4.   For 2025/26 the overall rate of draft
minutes issued within timescale was 64.8%, down on the previous year (82.7%) and below
the target of 85%.  A combination of staff shortages, increased workloads and annual
leave during the year has impacted the service, however performance has improved over
the course of the year.  The target level will be kept under review. There is still confidence
in the level being appropriate. (PI - CS003)   
Complaints and MP/MSP Enquiries
5.5  In line with the Performance Management Framework, complaints are reviewed quarterly
by departmental management in terms of time taken to respond, outcome and learning
points.  Detailed tables can be accessed within the Background Papers section of this
report.  
5.6  A total of three complaints were received during the period January to March 2026, with
two complaints being closed.  Both closed complaints were dealt with at frontline stage,
with neither being upheld.  For the reporting year Governance services responded to eight
complaints, all at frontline stage with an average response time of 3 days.  Of these eight
complaints six were for Legal Services and two for Democratic Services.  One complaint
was upheld with action taken to update guidance notes for Council letter templates, while
the remaining seven complaints were not upheld.  
5.7  Over the last three years the Council have dealt with just over 1,300 non-statutory MP/MSP
enquiries.  This is in addition to over 2,000 statutory complaints received over the same
period, with both complaints and enquiries being subject to the Model Complaints
Handling Procedure (MCHP).  The following graph shows the quarterly volume of MP/MSP
enquiries received since Quarter 1 2023/24. 
On average each quarter over the last three years the Council have received 110 MP/MSP
enquiries.  The volume of enquiries had decreased year on year since 2020/21, however
there has been a 22% increase of enquiries this reporting year compared to the previous
year, with 453 received and dealt with in 2025/26.  Operations & Environment Services
Page 44

Page 45

(156) and Housing, Property & Communities (148) received the most enquiries, accounting
for just over two thirds of the total enquiries in 2025/26. All enquiries follow a similar
process to that of complaints in being formally logged and responded to.   
Case Studies
5.8  The Registrar Service moved from their former High Street premises to the Council
headquarters in November 2025 and have now had 16 months of operating in the new
environment. Postive feedback has been received from the public over the new wedding
room in the Council HQ. Officers report that the confidential interview rooms in the HQ
Annexe building are more suitable for access and for sensitive conversations. Overall the
move is considered to be a service improvement. 
Consultation and Engagement
5.9  Committee services are currently consulting councillors on the user friendliness of the
Council’s online committee management system with a view to targeted training sessions. 
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) X 
Policy and Legal  X
Financial  X
Risk  X
Staffing  X
Best Value and Transformation X 
Property  X
Information Communications Technology/Digital  X
Equalities. Social Inclusion and Economic Impact   X
Climate Change and Biodiversity Impact  X 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
Page 45

Page 46

☒ Empowering and connecting communities.
☒ Improving wellbeing of our population   
6.3  Policy and Legal 
The Council has a statutory requirement to publish a range of information that will
demonstrate that it is securing best value and assist in comparing performance both over
time and between authorities where appropriate.  
6.4  Financial 
There are none arising from this report. 
6.5  Risk 
There are none arising from this report.  
6.6  Staffing 
There are none arising from this report.  
6.7  Best Value and Transformation 
How councils plan for, manage and report on performance is a key area of focus in
external audit work, particularly on best value.  
6.8  Property 
None arising from this report.  
6.9  Information Communications/Technology/Digital 
None arising from this report.  
6.10  Equalities, Social Inclusion and Economic Impact 
An Equality Impact Assessment is not required as this report is to inform the Committee
on performance.  
6.11  Climate Change and Biodiversity Impacts 
None arising from this report. 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with the Executive Director Economy,
Enterprise & Operations, Chief Governance Officer, Service Managers and any comments
made have been incorporated into the report. 
8.  BACKGROUND PAPERS  
8.1  Service Plan Actions
Performance Indicators
Service Complaints 
Page 46

Page 47

Report to: Corporate Committee  Meeting
Date:
26 May 2026 
Report by: Executive Director Finance, Strategy and Transformation 
Author: Louise Marshall Contact
Email:
performance@moray.gov.uk 
Subject: Local Government Benchmarking Framework 2024-25 Results 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to present a corporate overview of benchmarking
performance data for the period 2024-25. 
1.2  This report is submitted to Committee in terms of Section III A (4) of the
Council’s Scheme of Administration relating to monitoring performance in
accordance with the Council’s performance management framework. 
2.  SUMMARY  
2.1  The Local Government Benchmarking Framework (LGBF) provides evidence of
trends in how resources are allocated, performance of services and levels of
customer satisfaction.   
2.2  At the time of reporting, results have been published for 95 indicators.  Two
indicators are no longer collected locally and five have yet to be published.   
2.3  An assessment of relative performance in recent years can be inferred to an
extent in an improving trend up to 2021/22, followed by a drop off in 2022/23,
thereafter the pace of recovery has slowed from that of previous years as
presented in the charts below.   
2.4  Assuming no significant change in rankings for the 5 indicators yet to be
published, overall, the position in terms of relative performance will remain
stable and like that of 2023/24.
Item 9.
Page 47

Page 48

2023/24 vs 2024/25 
No change        
3 indicators 
Results improved Result worsened  Not yet published    
50 indicators  42 indicators   5 (5%)        
indicators 
3.  RECOMMENDATIONS  
3.1  It is recommended that Committee scrutinise and note the Council’s
performance in terms of a corporate overview of benchmarking results.   
28% 28% 18% 23% 23% 24%
19% 24% 34% 22% 21% 19%
24%
27% 24% 28% 26% 24%
29% 20% 24% 27% 30% 28%
0% 5%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2019/20 2020/21 2021/22 2022/23 2023/24 2024/25
LGBF relative performance -national
1st quartile 2nd quartile 3rd quartile 4th quartile N/A
30% 34%
22% 23% 25% 23%
10%
18% 32% 21% 18% 19%
22%
18% 18% 29% 27% 29%
39% 30% 28% 27% 30% 24%
0% 5%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2019/20 2020/21 2021/22 2022/23 2023/24 2024/25
LGBF relative performance -family
1st quartile 2nd quartile 3rd quartile 4th quartile N/A
N/A
Page 48

Page 49

Louise Marshall
Strategy and Performance Manager 
4.  BACKGROUND AND CONTEXT  
4.1  Local Government Benchmarking Framework (LGBF) data is refreshed
throughout the year with the final data published around June each year.  The
results inform the National Benchmarking Overview Report.  The Improvement
Service collate data from national sources following annual submissions that
is subjected to extensive validation processes, a contributory factor to the
time-lag in publication and reporting.  A small number of results are supplied
directly by local authorities.  The full suite of benchmarking data can be viewed
using the Improvement Service LGBF Dashboard. 
4.2  Family Groups of councils were developed around the type of population that
they service (e.g. relative deprivation and affluence) and the type of area in
which they serve them (e.g. urban, semi-rural, and rural) to allow
improvements to be identified and good practice shared through a programme
of events arranged and facilitated by the Improvement Service. 
People Services Other Services
Includes education, social work and
housing. The benchmarking clubs are
based on the average social context of
the local authority population (using
data from SIMD).
Includes environmental services and
culture/leisure services. The
benchmarking clubs are based on the
dispersion of the local authority
population (using data for the Grant-
Aided Expenditure indicator for
population dispersion).
Angus
Argyll & Bute
East Lothian
Highland
Midlothian
Moray 
Scottish Borders
Stirling
East Ayrshire
East Lothian
Fife 
Moray
North Ayrshire
Perth & Kinross
Stirling
South Ayrshire 
4.3  Results and commentary on benchmarking performance are included in
Quarter 4 performance reports submitted to service committees in line with
the Council’s performance management framework.  
4.4  Caution is advised on making direct comparison between years due to
significant impact of Covid-19 on results. 
5.  NATIONAL PERSPECTIVE 
5.1  This, the fourteenth annual report, evidence that despite significant
innovation, service redesign and partnership working, councils are operating
Page 49

Page 50

under sustained financial, workforce and demand pressures that are reaching
the limits of what can be delivered within existing resources. 
5.2  Financial Pressures: structural strain
• Funding failing to keep pace with inflation, demand growth and expanding
national commitments.
• Forward spending plans indicate further pressure on council budgets, with
funding projected to fall by 2.0% in 2027/28 and 3.8% in 2028/29 against a
predicted overall Scottish spending rise over the same period of 4.68%
• Statutory services, primary education and social care absorb over 70% of
expenditure, leaving limited scope for discretionary or preventative
investment.
• Infrastructure continues to deteriorate faster than repairs can be funded.
• Addressing these challenges; councils explore wider transformation, whole-
system redesign, shared services, digital modernisation, automation, better
use of data and strong partnership working 
5.3  Workforce challenges: capacity, recruitment, demographics
• Workforce pressures, recruitment and retention challenges are acute in
social care, social work, planning and environmental health and increased
absence rates.
• An ageing workforce presents succession risks, under representation of
minority ethnic and disabled employees.
• Service specific workforce pressures in care sector, specialist teacher
shortages in STEM and rural areas.
• Addressing these challenges; strengthened national and local workforce
planning, improved data use and modernised employment practices. 
5.4  Health and social care: rising demand, limited capacity
• Demand for adult social care continues due to ageing population and
increasing complexity.
• Provider fragility constraining system capacity despite rising need.
• Addressing these challenges; collaboration on digital tools, staff wellbeing
and joint resource planning.   
5.5  Education: recovery amid rising complexity
• Signs of recovery in Education services, growing complexity and workforce
pressures continue.
• Rise in real time spending by around 20% since base year of 2010/11 to
reflect national policy commitments.  Substantial growth in Additional
Support Needs (ASN), now affecting over 40% of pupils with specialist ASN
teacher numbers continuing to fall.
• Primary attainment above pre-pandemic levels, narrowing of poverty
related gaps.
• Attendance remains lower than expected, with non-attendance linked to
anxiety and complex ASN for a small yet growing cohort.
Page 50

Page 51

• Early years developmental outcomes of 27–30-month health reviews
improving, quality of provision remains high.  The mixed provider model
increases reliance on private and voluntary settings that adds to pressures
around stability and quality assurance.
• Addressing these challenges; continued progress in strengthening
collaboration on ASN, equity and curriculum development. 
5.6  Tackling poverty: persistent structural pressures
• Households facing high housing and energy costs, limited income growth
and labour market inequalities.
• Child poverty above 2014/15 levels.
• Rent arrears falling and Council Tax collection stable but demand for crisis
support remains high.
• Addressing these challenges; strengthened strategic approaches to poverty
through improved data, spatial analysis and whole system initiatives. 
6.  MORAY RESULTS  
6.1 The national context presents a similar picture to that of Moray in the efforts
and achievements delivered against an increasingly challenging backdrop and
how sustained financial and workforce pressures have disrupted performance
and efficiency improvements gained in previous years. 
6.2 Despite challenges, good or improving performance is recognised in school
attendance, 16–19-year-olds participation rates, gender balance in senior
posts, crisis and community care grant decision timescales, hospital re-
admission rates, hospital delayed discharge, road condition, waste recycling
rates, financial outturn and CO2 emissions for electricity and natural gas. 
Generally, cost indicator results across service areas are low in comparison to
other local authorities; however, this should be considered alongside
performance and customer results. 
6.3 Of the 95 results published, 29 results are placed in the lowest quartile (ranked
25th to 32nd), these are scrutinised in relation to improvement by the relevant
Service Committee as part of 2024-25 Quarter 4 Performance Reports
submitted to the June cycle of meetings.  Commentary on these indicators and
an additional four indicators relating to school attendance for looked after
children, gross value added per capita and carbon emissions in scope of local
authority, being the latest results for 2023-24 that were not published at the
time of reporting to this committee last year are included at Appendix 1.    
6.4 Lowest quartile performance was reviewed by the senior management team to
ensure planned work will secure improvement, particularly in the following
Corporate Plan priority areas.  For ease of reference, throughout, indicators
measuring Corporate Plan performance are emboldened. 
Page 51

Page 52

• Improving attainment for all, a focus within the tackling poverty and
inequality priority is being progressed through the development and
implementation of the following strategy areas that will directly contribute
to improved performance results; National Improvement Framework self-
evaluation and Raising Achievement of our Learners, Our Moray Standard:
Learning and Teaching Strategy and Supporting all Learners Strategy, Moray
and Northern Alliance Progressions of Literacy and Numeracy, Achievement
of Curriculum for Excellence Levels Assessment and Moderation
Guidelines, Quality Assurance and Moderation support, Tracking and
Monitoring Guidelines and Moray Quality Improvement Framework. 
Devolved school budgets and wider funding of Scottish Attainment
Challenge, Pupil Equity and Strategic Equity Funding ensure schools
continue to work to close identified attainment gaps.  Full scrutiny of Initial
Analysis of Secondary School Attainment – Session 2024-25 and Initial
Analysis of Achievement of Curriculum for Excellence Levels – Session
2024-25 was undertaken by Education, Children’s and Leisure Services
Committee on 25 November 2025 (para 24 of the Minute refers) and 3
March 2026 (item 9 of the Agenda refers) respectively.  The service
continues to tackle the challenges around issues impacting on attainment
that include staff absence, inability to recruit teachers in key subject areas
and ongoing ICT issues locally leading to reduced learning time. 
• Tackling the affordability of the school estate whilst meeting climate
requirements contributes to Building Thriving, Resilient, Empowered
Communities is addressed with the development of the Learning Estate
Strategy, delayed due to the delivery of additional supporting information to
inform the Learning Estate Review, including an independent review of the
school roll forecasting methodology, together with the diversion of team
resource to support Future Forres Academy and Future Buckie High School
projects but is scheduled to be reported to committee.  The draft update of
the Climate Change Strategy 2025-2035 and Routemap to Net Zero,
developed through an officer/member working group, sets out how the
Council will respond to its statutory duties to reduce carbon emissions,
adapt to the impacts of climate change, and to embed sustainable
principles within the Council, was approved, subject to public consultation
by Council in September 2025 and will be presented for final approval from
Council in June 2026.  The Biodiversity Strategy gained final approval from
Council in May 2026. 
• Corporate Plan Strategic Framework and improving indicator results rests
on the delivery of the Medium to Long Term Financial Strategy and the
Workforce and Organisational Development Strategy. 
6.5 Results that have improved / worsened by 5% from previous year are
highlighted at Appendix 2 and a table of results split by theme is presented at
Appendix 3.  
Page 52

Page 53

7.  SUMMARY OF IMPLICATIONS  
7.1 The table below shows whether risks and implications apply if the
recommendations are agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) X 
Policy and Legal  
Financial  
Risk  
Staffing  
Best Value and Transformation  
Property  
Information Communications Technology/Digital  
Equalities. Social Inclusion and Economic Impact   
Climate Change and Biodiversity Impact   
7.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP))
Improved Collaborative Leadership, as part of continuous improvement
through Best Value, will better enable the Council to fulfil the ambitions set
out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the
following Council Plan strategic priorities:
☒ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report
support and contribute to improved outcomes for communities as
outlined in the following local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in  
Moray.
☒ Empowering and connecting communities.
☒ Improving wellbeing of our population 
7.3 Policy and Legal 
The Council has a statutory requirement to publish a range of information that
will demonstrate that it is a securing best value and assist in comparing
performance both over time and between authorities where appropriate.  
7.4 Financial 
None arising from this report.
Page 53

Page 54

7.5 Risk 
None arising from this report although effective performance management
assists in the management of risk.  
7.6 Staffing 
None arising from this report.  
7.7 Best Value and Transformation 
How councils plan for, manage and report on performance is a key area of
focus in external audit work, particularly on best value.  
7.8 Property 
None arising from this report.  
7.9 Information Communications/Technology/Digital 
None arising from this report.  
7.10 Equalities, Social Inclusion and Economic Impact 
None arising from this report.  
7.11 Climate Change and Biodiversity Impacts 
None arising from this report. 
8.  CONSULTATION  
8.1 This report has been prepared in consultation with Head of Governance,
Strategy and Performance and senior managers, any comments made
have been incorporated into the report. 
9.  BACKGROUND PAPERS  
9.1 LGBF Dashboards
National Benchmarking Overview Report 2024/25
Elected Member Guidance: Understanding and Using the LGBF
LGBF Indicators – Pentana backing tables   
Page 54

Page 55

APPENDIX 1 
The Local Government Benchmarking Framework (LGBF) data provides evidence of trends in how resources are allocated, performance of
services and levels of customer satisfaction.  This year’s results introduce available data for 2024/25 as well as data for 14 indicators relating
to 2023/24 that was not available at the time of annual reporting last year.   
Since base year (2010-11), changes in expenditure evidence the most significant increases in Economic Development, Adult Social Care,
Education, Looked After Children and planning and reductions in Roads, Support Services, Environmental Service and Culture & Leisure. 
Positive performance in top quartile rankings is evident in individual indicators across most headings but more notably in Adult Social Care
and Environmental Services. 
Exceptions based on 32 local authorities; areas of service delivery ranked in the lowest quartile are presented below as Notes to
Benchmarking Results.  Care should be taken when making comparison over time and with others due to the complexities around altered
delivery and operating landscapes during the reporting period. 
The National Benchmarking Overview Report is available here. 
Page 55

Page 56

No Challenges Actions to improve to present time Outcome
Children’s Services  
1 Proportion of children looked after in a community setting increased to 78%,
improving the ranking to 28th, but below the national average (88.8%). 
Performance has featured in the lowest quartile since 2010-11.  Latest data
relates to 2023-24. 
The Carer Recruitment Campaign continues to focus on the
recruitment of foster carers and supported lodgings carers,
increasing capacity.  Looked after children in Moray in approved
Kinship Care with family members is in line with family average,
work continues to strengthen practice, ensuring children at the
point of allocation, have a holistic extended family map
produced on Kinship care options in the event short breaks or
alternative care may be necessary.  95.5% of brothers and sisters
in Foster Care and Kinship Care remain together with at least one
sibling above the national average of 79%.  Maintaining
Relationships Project is developing an approach and policy to
ensure brothers and sisters remain together where this is their
assessed needs, albeit more challenging when need to
accommodation 3 or more children due to resource limitations. 
(Source: Quarter 2 Performance Report for Children and Families and
Justice Social Work, IJB 26 February 2026)
Improving
outcomes for
Looked After and
Care Experienced
Children and Young
People (Children
Services Plan 2023-
26)
2 Percentage of pupils entering positive destinations results and rankings
have dropped year on year since 2021-22, to 93.5% against largely
consistent comparator results. Positive destinations include higher/further
education, employment, training, personal skills development and
voluntary work.  In 2024-25 there were 1,086 leavers with 1,015 progressing
to positive destinations, key results: 34.6% to higher and 23.8% to further
education, 30.1% to employment.  6.5% (71 young people) were recorded
as unemployed seeking, unemployed not seeking or unknown. 
• Getting it right for every child so that we continue to improve
attainment for all 
Key actions for raising attainment are progressing at school
and system levels for Senior Phase; Secondary school
improvement visits are complete with moderated reports
identifying strengths and areas for improvement.  Secondary
school targets are monitored at key milestones.  Depute
Headteacher Tracking and Monitoring Network developed to
support collaboration, meeting in terms 3 and 4. 
Moray schools continue to work with key partners including
Skills Development Scotland, Moray Pathways, Moray College
UHI and wider employability partners to ensure pupils are
supported to positive onward destinations.  It should be noted
that health factors may impact on future pathways and routes
to success for young people where our schools continue to
monitor this through early intervention approaches. 
(Sources: 2023-24 Analysis of Secondary School Leaver Attainment
2023-24 / Q3 Performance updates) 
Improved
attainment at both
Broad General and
Senior Phase
identified through
ACEL and LGBF
measures
Page 56

Page 57

3 4
5 6
7
Average tariff points for each unit or course are calculated from the latest
and best achievement of pupils based on the SCQF level of the award and
grade achieved (for graded courses S4-S6).  The Scottish Index of Multiple
Deprivation (SIMD) identifies small area concentrations of multiple
deprivation showing the difference between young people living in the
most and least deprived areas. 
Overall average total tariff improved slightly to 829 but remains below
national and family averages, similar slight improvements are recorded for
SIMD quintiles 2 and 5 but slightly worsened in SIMD quintiles 3 and 4, all
remain ranked in the lowest quartile. 
• Getting it right for every child so that we continue to improve
attainment for all 
Following initial attainment meetings, separate group
sessions with all Secondary Head and Depute Head Teachers
were held to explore core issues in relation to low attainment
in Senior Phase in relation to benchmarking data and
effects/symptoms, root causes and possible solutions.  Ten
summary priorities have been developed to raise attainment. 
These sessions have further developed into school-based
actions and system wide actions making use of existing and
newly created DHT networks supported and led by secondary
HTs and the Quality Improvement Manager. 
Moray Secondary Schools have benefitted from over £500k
additional funding under the theme of tackling poverty and
inequality to improve education attainment in the form of an
Intervention Fund for each school to target areas for
improvement. 
Secondary Schools continue to progress work on key priorities
framed by School Improvement Plans set out annually. 
(Source: Initial Analysis of Secondary Attainment – Session 2024-2025) 
Improved
attainment at both
Broad General and
Senior Phase
identified through
ACEL and LGBF
measures
8 The percentage of P1, P4 and P7 pupils combined achieving expected CFE
Levels in Numeracy made slight improvement to 76.9%, achieving the
Stretch Aim target of 73-77% 
• Early intervention addressing whole family well-being to
ensure that children can reach their full potential 
Strengthening Achievement of Curriculum for Excellence
levels across the Broad General Education being taken
forward through actions across strategy and support
materials, professional learning and moderation, tracking and
monitoring and support and challenge.  Key areas of work as a
wider schools and central education system continues to
progress. 
Progress across Moray schools and centrally to address
identified attainment gaps and barriers to learning and
achievement also continues through ongoing monitoring of
data throughout each school session as part of Moray Quality
Improvement Framework (MQIF), across Associated Schools
Groups (ASGs) and Family Improvement Groups (FIG)
collegiate session.  Moray Numeracy Strategy is being
developed in partnership with Education Scotland.  Schools
Improved
attainment at both
Broad General and
Senior Phase
identifies through
ACEL and LGBF
measures
Page 57

Page 58

are involved in STEM spatial skills in Maths with Glasgow
University. 
Stretch Aim for Primary numeracy (P1, P4, P7 combined) for
2026 has been set at 78%. 
(Source: Initial Analysis of Achievement of Curriculum for Excellence
levels: Session 2024-2025) 
9 Funded early years provision which is graded good/better fell slightly to 84.0%,
below national and family averages, which were also subject to slight result
decreases. 
A new national Shared Quality Framework launched in
September 2025, aimed at enhancing outcomes for children in
ELC settings that provide high-quality, equitable and responsive
experiences. The framework will be used as an evaluation tool,
key to this process will be ELC settings evidencing robust self-
evaluation processes to support improvement and the Care
Inspectorate and HMiE in their inspections and evaluations. 
ELC settings will be supported by the central officer team, and
through a variety of hybrid training opportunities, to develop their
knowledge and understanding of the framework.  Officers are
building a Quality Improvement Framework akin to the schools
one and are supporting services to develop improvement plans
and associated self-evaluation processes.  As a result, the
number of settings not meeting the nation standard is reducing. 
(Source: Shared Quality Improvement Framework for Early Learning and
Childcare settings ECLS 25 Nov 2025)
Improve self-
evaluation for self-
improvement
across ELC settings
shared
understanding of
new improvement
areas
10 Latest published data for School attendance rates (per 100 ‘looked after
pupils’) was 82% in 2023-24, below national and family averages and on a
decreasing trend since 2020-21. 
Education Attendance Policy, scheduled to be agreed by ECLS
Committee in June 2026, has been updated and toolkits
(‘Attend to Achieve’) have been developed to strengthen
consistency across school settings in supporting positive
pupil attendance and providing supportive guidance where
necessary.  Schools will use the policy and toolkit for ongoing
monitoring and address levels for individual pupils, groups
and cohorts that are causing concern through single agency
approaches or multi-agency intervention. 
Parental engagement and the importance of reinforcing
positive school attendance for maximum learner attainment,
achievement and post-school opportunities is ongoing across
schools. 
(Source: Shared Quality Improvement Framework for Early Learning
and Childcare settings ECLS 25 Nov 2025)
Improved
attainment at both
Broad General and
Senior Phase
identifies through
ACEL and LGBF
measures
Page 58

Page 59

10.1 Slight improvement in the proportion of Child Protection re-registrations within
18 months to 10.3%, below that of national and family averages (6.8%) and
remaining in the lowest quartile. 
The safety and wellbeing of children is ensured through timely,
proportionate, and effective support, repeat registrations
indicate risks have re-emerged or were not sufficiently reduced
following previous support. 
To address this, the partnership considers the staged closure of
families to social work and the move to child planning for families
where children have required a protection plan.  Learning from
repeat registrations identifies systemic gaps and improved
practices. 
(Source: Quarter 2 Performance Report for Children and Families and
Justice Social Work, IJB 26 February 2026)
Family: Keeping
Children and Young
People safe
Corporate Services  
11 Gender pay gap at 4% is above the national average of 1.4%, with average
hourly rate of pay for males at £19.66 above that of females, £18.87. 
A high number of employees (around 40%) are employed in service areas
such as catering, cleaning, care at home and schools support staff, areas
populated predominantly by a high number of part time female employees;
often who may hold more than one part time position across these
services. 
It is not always possible to apply comparisons in terms of the service
delivered and the composition of the workforce as not all councils deliver
the same services. 
The implementation and embedding of the Smarter Working
Project have supported the workforce in continuing to
undertake a range of flexible working options, making the
workplace more accessible for office-based staff which may
have positively impacted the reduction in the pay gap. 
The commitment to continue to improve recruitment
packages which support accessibility to work for all genders
through more creative ways of working and that support the
journey to sustainability continues.  The long-term impact on
the pay structure arising from the living wage and other pay
related issues are monitored to have in place fair and
competitive pay and conditions recognised as such and are
free of bias. 
Some progress was made in gathering workforce data but
remains an ongoing action to increase engagement to
improve the workforce personal data capture and therefore
more accurate reporting. 
Gender Pay Gap
and equality
issues are
assessed and
mitigating actions
put in place if
required
Page 59

Page 60

12 Teacher absence levels increased in 2024/25 to 10.8 days per teacher, the
highest recorded since benchmarking began, ranked lowest nationally.   
High levels of workforce absence present several challenges for schools,
including increased reliance on supply cover, additional pressure on school
leadership teams and need to manage operational continuity within already
demanding environments. 
Improving Attendance Project report was presented to Council
on 3 December 2025 (item 7 of the Agenda refers) detailing
additional targeted support to assist in the maximisation of
teaching staff attendance at work, reducing absence costs and
reducing service impact on children and young people as part of
a spend to save transformation project, agreeing funding of £89k
as an initial pilot of one year support.  Progress will be reported at
6 months following implementation against defined targets.   
The project is focused on strengthening absence management
arrangements, consistent application of council policies and
supporting service managers in their responsibilities, including
reinforcing the supportive elements of the Health at Work Policy
to promote staff wellbeing, provide consistent and fair
management of absence and support sustainable returns to
work alongside improved attendance levels. 
(Source: Improving Attendance Project, ECLS 3 March 2026) 
Improved
attendance at
work, reducing
absence related
costs and
strengthen the
consistent
application of
absence
management
processes
13 Percentage of invoices sampled that were paid within 30 days remained
relatively unchanged at 89.5%.  Of the 55k invoices sampled, 49k invoices were
paid within 30 days, resulting in the indicator remaining in the lowest quartile. 
Early mapping work completed to increase efficiency and
availability of digital processes for Accounts. 
Replacement of the finance management system is in the early
stages with system operational anticipated by April 2028.  Market
research completed as expected and tender process underway. 
Services are reminded to process invoices promptly. 
(Source: Q3 Performance updates) 
Investigate
workflow for
authorisation
database
14 Scottish Welfare Fund awarded £392k of the £657 budget (59.6%), below family
and national averages. 
Scoping of centralised means testing has progressed and
demonstrates that support can be provided towards the recovery
of outstanding social care cost debts.  Improvement in key areas
could be gained by aligning some of the processes within social
care financial assessments with the benefits and money advice
Determine whether
a staffing efficiency
and maximisation
of council
resources is
achievable.
Page 60

Page 61

service to perhaps identify where additional support can be
provided. 
(Source: Q3 Performance updates) 
Assets  
15 There has been a slight decrease in 55.4% in the percentage of internal floor
area of operational buildings in satisfactory condition.  119k m2 of 215k m2 was
of satisfactory condition. 
The Moray Learning Estate is a significant contributory factor to the operational
building condition indicator and with over half of the 52 schools having
condition surveys of less than B condition, the indicator ranking remains in the
lowest quartile. 
• Tackle the affordability and standard of our learning estate to
ensure sustainability while meeting climate requirements 
Design and construction – Elgin High School extension build
Design and construction – future Forres Academy operational
Design and construction – Future Buckie High School operational
Engagement and consultation – ASG Level Options Development
– long term investment strategy
Strategic Planning – Learning Estate Review Report
Engagement and consultation – effective stakeholder
engagement on Learning Estate sustainability options
Estate Rationalisation – future of Crossroads PS agreed
Design and construction – options developed to manage for Elgin
South and North primary school capacity requirements
Design and construction – schools BB upgrade programme
delivering minimum 3 B condition/suitability school upgrades per
year 
(Source: Corporate Plan Q3 2025-26) 
Moray has high
performing schools
that are fit for the
future and
financially and
environmentally
sustainable.
Adult Social Work
16 73.8% of care services were graded ‘good’ or better in Care Inspectorate
inspections, below family and national averages.   
External inspection results and commentary are included in the
Annual Performance Report. 
Services are assessed by the Care Inspectorate to ensure that
services provided meet the required standards and peoples’
outcomes are being met.
People who use
health and social
care services have
positive
experiences of
those services, and
Page 61

Page 62

Much focus is placed on learning from complaints and feedback
to continually improve the quality and safety of services as well
as feedback received directly via surveys conducted as part of
monitoring and service redesign. 
(Source: Annual Performance Report 2025/25, Moray Integration Joint
Board Audit, Performance and Risk Committee, 19 June 2025)
have their dignity
respected.
Culture & Leisure  
17 The cost per library visit decreased to £5.23 due to an increase in the number of
library visits against a small reduction to net expenditure. 
In 2024-25, net expenditure totalled £2.4m, with 459k visits to library services. 
Across Scotland, results range, suggesting there are variations in calculation
methods which has been acknowledged nationally with clarity added to the
definition.   
• Transform our Sport & Leisure, Libraries, Learning Centres &
Heritage, Music Instruction & Performance service provision to
ensure a sustainable council for the future 
A report was submitted to Council on 3 December 2025 to
update on the transformation journey of Libraries, Learning
Centres and Heritage Service, proposing a tiered operating
model to provide a more standardised and efficient model for
future based on evidence and need. 
Extensive engagement with newly established library user groups
in all 11 branches across Moray was held over three meetings
with groups, that were supported by local members. 
Q3 update (93% complete) – The Change Management Plan has
been partially implemented.  With approval of the proposal,
implementation of Change Management Plans continue. 
(Source: Libraries, Learning Centres and Heritage Service Transformation,
Q3 performance updates)
Create a
sustainable future
for our services by: 
Engaging new users
to access our
service to be active
and ensure
prevention/early
intervention
improves their
long-term health
and wellbeing
prospects. 
Engaging new users
to access digital
and physical
resources and
support to improve
their lifelong
learning
experiences. 
Creative arts
participation and
pathways are
further developed
enhancing lifelong
learning
experiences.
Page 62

Page 63

18 The percentage of adults satisfied with Museums and Galleries (rolling 4 years)
fell to 45%, below national and family averages, remaining in the lowest
quartile. 
Due to budgetary constraints, operation of the Moray Museum
Service ceased on 1st April 2020.  The Falconer Museum with
Store is closed until an alternative service model is established. 
The collection continues to be monitored and buildings
maintained.
N/A
Environmental Services  
19 The percentage of adults satisfied with refuse collection (rolling 4 years)
remained at 76%.  Indicator has dropped back into the lowest quartile. 
Taken from the Scottish Household Survey where around 10,500
households were interviewed with lower-than-expected
response rates inferring the sample size may be small.  This
should be set against positive performance in terms of the level
of recycling, costs of waste collection and disposal.  A review of
complaints has resulted in some procedural changes relating to
Household Collections. 
(Source: Q3 performance updates) 
N/A
Housing Services  
20 In 2024-25, 2,799 of 6,410 (43.7%) of properties within scope met the Scottish
Housing Quality Standards (SQHS). Performance has improved in recent years;
however, meeting energy efficiency elements is a significant part of SHQS and
results for this element have not been published since 2021-22 due to Scottish
Government review of EESSH2.  Indicator remains in the lowest quartile.   
• Continue to reduce the carbon impact arising from Housing and
Property Services 
In 2024-25, there was significant investment to improve energy
efficiency of housing stock by upgrading heating systems,
building insulation and solar panel installation.  Progress has
stifled by resource issues relating to tenant agreement to works,
contractor availability and time lag with certifications to confirm
improvements.  Contracts in place to continue to deliver
Phased
improvement of
energy efficiency
within corporate
buildings and
housing stock.
Page 63

Page 64

improvements in energy efficiency within the Council’s housing
stock. Scottish Housing Regulator confirmed provisional data
indicated as of September 2025 EESSH compliance increased to
73.3%, the expectation for the year ending 31 March 2026 is for
80% compliance, which will positively impact on the council
dwelling meeting SHQS. 
(Source: Q3 performance updates)
Economic Development  
21 The percentage of unemployed people that were assisted into work from
Council operated / funded employability programmes improved to 10.4%.
Of the 135 people supported into work, 79% sustained work for over 13
weeks. 
The Local Employability Partnership, Moray Pathways
continues to support individuals into fair and sustainable
jobs.  Overall, over 300 people were supported, 285 are
participating in vocational skills programme; Sector based
Work Academy Programme (SWAP).  65 people have gone
onto further or higher education.  Support has also been
provided through; Barrier Removal activities (involving 205
service users), Creative Skills Network activities (112 service
users), CLD personal development (56 service users) and
Counselling (47 service users), 29 others are currently in the
engagement phase. 
Moray Pathways Local Employability Partnership Annual
Report was submitted to the Economic Development and
Infrastructure Services Committee on 17 June 2025. 
Moray Pathways Workforce North Event took place in
December 2025 with 100 attendees and a total of 50 local
employers from the energy sector, training providers and key
stakeholders from the public sector.  The Moray Workforce
Group are working on a roadmap / action plan to progress. 
(Source: Q3 performance updates) 
Increase the
number of
individuals who
are participating in
learning, training
and employment
opportunities
22 Cost per planning and building standards application increased to £9,931 due
to a 19% reduction in the number of applications decided to 362 and a 16%
increase in gross expenditure to £3.595m.  Result is above that of national and
family averages. 
Despite the increase in cost, the average processing time per
business and industry planning application at 8.5 weeks remains
in the top quartile performance results. 
Additional expenditure for the Levelling Up project within the
Planning policy service – Town Centre Development project
Improved
performance in line
with pillars set out
in the template
with local case
Page 64

Page 65

commenced during 2024-25 from the UK Levelling Up fund. 
£700k of funding provided to property owners to undertake work
in Elgin Town Centre. 
studies and
performance data
23 Slight increase in investment in Economic Development & Tourism per 1,000
population to £89,085, with a total gross expenditure in economic development
and tourism of £8.5m.   
Economic Development – increase in spend and income for
Growth Deal, Shared Prosperity and Regeneration Capital grant
initiatives during 2024-25.
The Council is progressing an updated Tourism Strategy for Moray
which is currently under consultation with final approval
anticipated in June. Meantime work on the Cultural Quarter
project intended to grow tourism in the area as part of Moray
Growth Deal also continues. 
Maximise the
economic, social
and cultural
benefits of tourism
to Moray and
spread the benefits
across all sectors
of the community.
24 According to the Annual Survey of Hours and Earnings (ASHE), based on a
1% sample of the Pay As You Earn (PAYE).  As of March 2025, in Moray 16.2%
of employees (18+ workplace based) earned less than the real living wage. 
The increasing cost of doing business and consequential
impacts on pay levels is felt particularly acutely in Moray
given the existing low wage economy. 
The Community Wealth Building Strategy and Action Plan
2024 was approved by the Economic Development and
Infrastructure Committee in April 2024.  Delivery of the
Strategy and actions has been restricted due to initial
resourcing difficulties.  Meantime further initiatives designed
to improve pay levels continue including Moray Growth Deal
and the emerging Skills Routemap following the Skills
Summit in December 202 . These will take time to have an
impact. 
Ensure wealth
stays within our
local
communities.
Page 65

Page 66

(Source: Q3 performance updates)
Financial Sustainability  
25 Total useable reserves as a percentage of council annual budgeted revenue
pertains to the movement in reserves statement data providing an indication on
the level of how a Council is placed to meet unforeseen events.  As at March
2025, useable reserves represent 13.8% of the council annual budgeted
revenue, below that of national and family averages.   
The Budget and Financial Plan are agreed by Council in February
each year.  The Council’s updated reserves policy was approved
by Council in September 2024. 
The Council was able to set a balanced budget for 2026/27
despite ongoing cost pressure for growing demand on services
and upward price inflation, acerbated by below inflationary
revenue grant awards from Scottish Government. It is expected
that the national average will reduce towards Moray’s level as
councils are using reserves to balance their budgets (£158m
used for 2026/27).
The Council’s reserves include allocation for transformational
projects, which seek to improve the effectiveness and efficiency
of its services. 
(Source: Budget and Financial Plan, Full Council, annually in February)
Ensure a financially
sustainable future.
26 Financing Costs to Net Revenue Stream is an indicator of affordability, it
highlights the revenue implications of existing and proposed capital
expenditure by identifying the proportion of the revenue budget required to
meet financing costs, net of investment income. Moray reported a ratio of 10.8.
Indicator remains in the lowest quartile. 
Prudential Indicators are reported to Council and reflective the
ongoing general requirement to increase borrowing to fund
capital expenditure in the capital plan, particularly in the
Learning Estate, Libraries and Leisure Estate and the Moray
Growth Deal. The breach of 10% was because of the introduction
of the accounting standard IFRS 16 Leases from April 2024
whereby additional costs previously treated as service
expenditure.  This indicator is factored into the Council’s
financial planning and is used as a tool for assessing affordability
of the capital plan,
A review of the long-term financing strategy is planned for 2026. 
Ensure a financially
sustainable future.
Page 66

Page 67

(Source: Budget and Financial Plan, Treasure Management Prudential
Indicators, Full Council, annually in February)
Climate Change  
27 Latest data published in July 2025 relates to the 2023-24 period, recording
6.54 tonnes per capita of CO2 emissions area wide for emissions within the
scope of influence of the Council, ranked lowest across all authorities. 
The data is taken from the UK Government UK local authority and regional
carbon dioxide emissions national statistics publication. 
2023-24 update to the Climate Change Plan and Routemap to
Net Zero, giving insight into current performance, identifying
key barriers to progress and outlining next steps to keep the
Council on a viable pathway to net zero was reported to
Council in August 2025.  Although emissions have reduced,
emissions arising from the Council’s fleet and property are
proving difficult to reduce at pace.   
Based on the pace and level of investment, the Council’s
previous target of being net zero by 2030 was recognised as 
not being achievable.  The Council agreed to amend the target
to 2045 with an update to the Council’s Climate Change
Strategy presented to Council in September 2025, providing
an opportunity to reflect on existing commitments and
reprioritise efforts to ensure that work aligns with local
needs, opportunities, and the evolving statutory landscape,
before making ready for extensive consultation. 
The Climate Change and Biodiversity strategies following
public consultation will be presented to Full Council on 30
June and 7 May 2026 respectively. 
(Source: Climate Change Plan and Routemap to Net Zero Update, Full
Council, August 2025, Climate Change Strategy 2025-2035, Full
Council, September 2025)
The Council
adapts to the
changing climate
and acts
sustainably
28 As at March 2025, there were 40.92 tonnes of CO2 emissions from Transport
per 1000 population, above national and family averages and remaining in the
lowest quartile. 
The data is obtained from the Sustainable Scotland Network Annual Report. 
The Council’s Zero Emission Fleet Replacement Strategy details
the Council’s plans to decarbonise the remainder of the fleet in
line with Scottish Government’s net zero targets, however these
plans are challenging in the setting of required budget savings. 
The Council adapts
to the changing
climate and acts
sustainably
Page 67

Page 68

Being a rural authority, this brings unique challenges due to the
high dependence on private cars and the lack of public transport
infrastructure. 
The Council are playing a crucial role in decarbonising transport
by encouraging active travel, implementing interventions such as
providing electric vehicle charging points, improving bus services
and promoting shared mobility options. 
(Source: Climate Change Plan and Routemap to Net Zero Update, Full
Council, August 2025) 
Page 68

Page 69

Moray appears in the following Benchmarking Family Groups – 
Table Legend
Relative Change Short Term Trend Rank 2024/25
2023/24 to 2024/25 Result to Previous
Year
Local Authorities
(32)
Family Group (8)
Result improving by 5%
or more  improved 1st quartile 1st quartile
Result worsened by 5%
or more  worsened 2nd quartile 2nd quartile  
no change
3rd quartile  3rd quartile  
4th quartile  4th quartile 
People Services (A) Other Services (B)
Includes education, social work and housing. The
benchmarking clubs are based on the average
social context of the local authority population
(using data from SIMD 2012).
Includes environmental services and
culture/leisure services. The benchmarking clubs
are based on the dispersion of the local authority
population (using data for the Grant-Aided
Expenditure indicator for population dispersion).
Angus
Argyll & Bute
East Lothian
Highland
Midlothian
Moray 
Scottish Borders
Stirling
East Ayrshire
East Lothian
Fife 
Moray
North Ayrshire
Perth & Kinross
Stirling
South Ayrshire
Page 69

Page 70

APPENDIX 2
Results improved / worsened (for results published since last reported)
Results that improved by 5% or >
• Gross cost of looked after children in a community setting per child per week reduced from
£488 to £460
• Improvement in the percentage of pupils living in the 20% most deprived areas gaining 5+
awards at Level 6
• Tariff score in SIMD Quintile 1 nearly doubled to 720, as a result ranking has moved from the
lowest to top quartile.
• School exclusion rates per 1,000 pupils improved to 17.1 improving ranked position by 3
places to 18th.
• Slight improvement in homecare costs per hour for people aged 65 or over to £30.90 due to
decreases in homecare expenditure of 7.6% and in care hours per year of 2.3%.
• Significant improvement to become the lowest rate nationally for readmissions to hospital
within 28 days per 1,000 discharges.
• The number of bed days people (75+) spend in hospital when ready to be discharged fell for a
second consecutive year, against a slight increase in population (+75) leading to an improved
delayed discharge rate.  
• Increased attendance and reduced net expenditure resulted in a reduced cost per
attendance at sports facilities, maintaining top quartile performance over the last 6 years.
• Increase in number of library visits against a slight decrease in net expenditure has resulted in
a reduction in the cost per library visit.  Result remains above the national average and in the
lowest quartile.
• Cost of parks and open spaces per 1,000 population reduced due to a decrease in net
expenditure.
• Net cost per waste collection per premise holds top quartile ranking for a decade due to a
reduction in net expenditure. 
• Reduced cost of street cleaning due to decrease in net expenditure against a slight increase
in estimated population maintaining a top quartile ranking since measurement commenced
in 2010/11.
• 10% reduction in gross expenditure in roads and winter maintenance resulted in an
improvement in the cost per kilometre, maintaining a top quartile ranking.
• Slight decrease in gross expenditure in Trading Standards, Money Advice and Citizens Advice
resulted in a decrease in cost per 1,000 population.
• Significant improvement in proportion of council dwellings meeting SHQS, despite
improvement, the ranked position remains unchanged and in the lowest quartile for last 4
years.
• Number of unemployed people assisted into work from council operated / funded
employability programme double to 135 improving the percentage result and ranking to 25th.
• Slight increase in gross expenditure resulted in improvement in the investment in economic
development and tourism per 1,000 population, albeit result remains well below the national
average and within the lowest quartile.
• Modest improvement in the proportion of properties receiving superfast broadband
• Slight decrease in emissions from natural gas per capita, remaining below national and
family averages and ranking in the top quartile. 
Results that worsened by 5% or >
• Percentage of pupils living in the 20% most deprived areas achieving 5 or more awards at
level 5 decreased significantly, dropping into the lowest quartile.
• Decrease in the percentage of adults satisfied with local schools over a rolling 4 years. 
Sample size from Scottish Household Survey will be a contributory factor.
• A 15% increase in the overall cost for collecting council tax resulted in an increased cost per
dwelling.
• Sickness absence days per teacher dropped to 10.8 days, above the national average and
ranked lowest nationally.
• Sickness absence days per employee (non-teacher) dropped to 15.7 days, above the
national average and falling to a ranked position of 23rd.
• £392k of Scottish Welfare Fund budget was spend, 59.6% of budget.
• Decrease in the proportion of adult care services graded good or better to below that of the
national average.
• Satisfaction rates in both adults satisfied with libraries and adults satisfied with Museums
and Galleries.  Scottish Household Survey sample size likely a contributory factor.
• Average number of days to complete non-emergency repairs increased to 6.3 days, below
the national average of 10.1 days, maintaining a lowest quartile ranking.
• Cost of Planning & Building Standards per planning application increased significantly due
to increased gross expenditure and a decrease in planning applications decided, dropping
into the lowest quartile.
• Average time per business and industry planning application (weeks) increased slightly but
result remains within the top quartile.
• Five percentage point decrease in the percentage of immediate available employment land
of total land allocated for employment purposes, improving ranked position by one place to
19th.
• Total usable reserves as a percentage of annual budgeted revenue dropped to 13.8% but
maintaining ranked position of just outside lowest quartile. 
• Ratio of Financing Costs to Net Revenue Stream for Housing Revenue Account increased to
30.1%, above the national average, remaining in the third quartile. 
Page 70

Page 71

APPENDIX 3
Overview of Local Government Benchmarking Framework Indicator Results 
Note Indicator Description
Moray National
Average 
Family 
Group
Average
Relative
Change
Since previous
year
Rank
Latest
result
2020/21 2021/22 2022/23 2023/24 2024/25 Latest
result
Latest
result
%
change 
Short
Term
Trend
Nat
(32)
FG
(8)
Children’s Services (A) 
Cost per primary school pupil (£) 6,358 6,876 7,163 7,178 7,252 7,606 7,780 1.0  7 2 
Cost per secondary school pupil (£) 8,656 8,947 9,131 9,250 9,211 9,338 9,533 -0.4  14 4 
Cost per pre-school education place (£) 8,906 11,081 11,270 10,197 10,410 12,055 12,174 2.1  4 2 
% of secondary pupils achieving 5 or more awards
at Level 5 66 63 62 62          64 69 66 2.2  22 5 
% of secondary pupils achieving 5 or more awards
at Level 6 34 30 28 30          31 41 37 1.1  23 5 
% of pupils living in the 20% most deprived areas
Gaining 5+ awards at Level 5 41 42 52 31 45 53 44 -7.1  21 4 
% of pupils living in the 20% most deprived areas
Gaining 5+ awards at Level 6 19 19 12 N/A2          21 24 17 9.5  14 2 
Gross Cost of “Children Looked After” in Residential
Based Services per child per week (£) 5,595 4,827 3,263 3,831          3,736 5,267 4,786 -2.5  5 3 
Gross Cost of “Children Looked After” in a Community
Setting per child per week (£) 478 520 475 488 460          480 429 -5.6  16 6
1 % of children being looked after in the community 82.2 80.6 75.3 78.0 77.6          88.3 83.6 -0.4  26 7 
% of adults satisfied with local schools (rolling 4 years) 64.5 72.7 77.2 76.1 67.3 69.0 69.5 -8.7  23 6
2 % of pupils entering positive destinations 94.1 96.2          95.1 93.8          93.5 95.7 95.3 -0.3  30 7
3 Overall average total tariff  876 882 834 826 829 922 869 0.4  26 6 
Overall average total tariff SIMD Quintile 1 887 735 571 378 720 655 543 90.5  5 1
4 Overall average total tariff SIMD Quintile 2 635 637 581 625 639 772 685 2.2  27 6
Page 71

Page 72

Note Indicator Description
Moray National
Average 
Family 
Group
Average
Relative
Change
Since previous
year
Rank
Latest
result
2020/21 2021/22 2022/23 2023/24 2024/25 Latest
result
Latest
result
%
change 
Short
Term
Trend
Nat
(32)
FG
(8)
5 Overall average total tariff SIMD Quintile 3 868 868 820 780 768 895 833 -1.5  30 8
6 Overall average total tariff SIMD Quintile 4 954 944 921 917 902 1,049 991 -1.6  29 6
7 Overall average total tariff SIMD Quintile 5 959 1,005 977 970 993 1,269 1,131 2.4  28 7 
% P1, P4 & P7 pupils combined achieving expected
CFE Level in Literacy 63.9 65.1 67.9 70.6 72.7 74.5 74.2 2.1  21 6
8 % P1, P4 & P7 pupils combined achieving expected
CFE Level in Numeracy 67.8 71.8 75.5 76.5 76.9 80.3 79.4 0.4  27 7 
Literacy Attainment Gap (P1,4,7 combined) –
percentage point gap between the least and most
deprived pupils
19.8 26.3 32.1 N/A2          N/A2               
Numeracy Attainment Gap (P1,4,7 combined) –
percentage point gap between the least and most
deprived pupils
17.5 24.7 26.6 N/A2          N/A2               
% of children meeting developmental milestones 96.0 84.9 87.4 83.4         81.7 83.5 85.1 -1.7  24 7
9 % of funded early years provision which is graded
good/better  85.2 86.9 87.5 84.1 84.0 89.0 89.1 -0.1  27 7 
School attendance (%) 93.8 N/A1 91.2 90.8 91.2 91.0 91.5 0.4  16 6
10 School attendance rates (LAC, %) 89.4  83.4 82.0 N/A3 
(Aug 2026)         83.7 85.2 -1.4  26 7 
School exclusion rates per 1,000 pupils 14.2  20.2  17.1 15.2 15.2 -15.5  18 4 
School exclusion rates per 1,000 looked after
children 125.0  156.0  N/A3 
(Dec 2026)               
% participation for 16-19 year-olds 91.8 91.6 94.5 93.1 94.3 93.3 94.3 1.2  12 6
10.1 % of child protection re-registrations within 18 months 2.3 9.8 0.0          7.0 8.8 6.8 6.8 -0.2  25 5
10.2 % LAC with more than 1 placement in the last year
(Aug-July) 14.9 15.9 11.8 14.7 10.9 16.5 19.5 -3.8  4 1
Page 72

Page 73

Note Indicator Description
Moray National
Average 
Family 
Group
Average
Relative
Change
Since previous
year
Rank
Latest
result
2020/21 2021/22 2022/23 2023/24 2024/25 Latest
result
Latest
result
%
change 
Short
Term
Trend
Nat
(32)
FG
(8) 
% of children living in poverty (after housing costs) 21.3 24.1 23.9          14.9 15.1 14.8 13.7 -0.3  22 7
Corporate Services (B) 
Support Services as a % of Total Gross Expenditure 4.1 3.9 3.8 3.7 3.7 4.0 3.7 0.1  14 5 
% of the highest paid 5% employees who are
women 61.1 62.7 59.5 61.2 62.3 60.3 59.7 1.1  8 3
11 The gender pay gap (%) 6.2 7.0 5.3 4.6 4.0 1.4 0.7 -0.6  29 7 
Cost of collecting Council Tax per dwelling 9.55 9.17 8.23 7.12 8.12 5.98 8.07 14.0  22 6
12 Sickness Absence days per Teacher 4.5 6.0 7.9 9.6 10.8 7.8 8.4 12.8  32 8 
Sickness Absence days per Employee (non-teacher) 8.7 11.1 12.8 14.0 15.7 14.5 14.9 12.2  23 5 
% of income due from Council Tax received by the end
of the year 95.8 96.7 96.7 96.2 96.2 95.5 96.1 -0.0  14 4
13 % of invoices sampled that were paid within 30 days 84.0 85.5 89.4 89.4 89.5 93.1 88.7 0.0  27 5 
% of Crisis Grant Decisions within 1 day 98.5 98.0 97.8 97.9 99.5 96.0 97.6 1.6  9 2 
% of CCG Grant Decisions within 15 days 90.8 95.5 89.3 98.1 99.2 90.7 95.1 1.1  8 4
14 Proportion of SWF Budget Spent 64.3 99.0 123.9 111.5 59.6 82.9 77.2 -51.9  28 7 
Proportion of DHP Funding Spent 90.6 75.6 79.8 90.0 89.0 99.0 89.6 -1.0  24 5
Assets
(B) 
% of operational buildings that are suitable for their
current use 98.2 97.6 97.5 97.4 96.1 85.7 90.5 -1.3  3 2
15 % of internal floor area of operational buildings in
satisfactory condition 66.9 54.9 56.3 56.3 55.4 91.0 88.4 -0.9  31 8
Adult
Social
W
ork (A)  Home Care costs per hour for people aged 65 or over
(£) 33.36 24.37 26.13 32.67 30.90 32.37 34.46 -5.4  14 4 
Self-Directed Support spend on people aged 18 or over
as a % of total Social Work spend on adults 5.0 3.6 4.6 4.8 6.7 9.4 7.4 2.0  17 5
Page 73

Page 74

Note Indicator Description
Moray National
Average 
Family 
Group
Average
Relative
Change
Since previous
year
Rank
Latest
result
2020/21 2021/22 2022/23 2023/24 2024/25 Latest
result
Latest
result
%
change 
Short
Term
Trend
Nat
(32)
FG
(8) 
% of people aged 65 or over with long term care needs
receiving personal care at home 63.4 61.3 59.8 60.3 61.6 62.3 59.8 1.3  22 4 
% of adults supported at home who agree that their
services and support had an impact in improving or
maintaining their quality of life (rolling 4 years) 
73.3  69.3       
% of adults supported at home who agree that they are
supported to live as independently as possible  79.3  71.9       
% of adults supported at home who agree that they
had a say in how their help, care or support was
provided 
70.2  59.5       
% of carers who feel supported in their caring role  31.6  28.2       
Residential costs per week per resident for people
aged 65 or over (£) 600 526 696 561 573 725 724 2.1  8 1 
Rate of readmission to hospital within 28 days per
1,000 discharges (%) 100.9 85.9 80.6 76.5 61.0 102.8 102.3 -20.3  1 1
16 Proportion of care services graded ‘good’ (4) or better
in Care Inspectorate inspections (%) 79.8 80.0 74.0 81.1 73.8 81.9 79.8 -7.3  28 7 
Number of days people spend in hospital when they
are ready to be discharged, per 1,000 population (75+) 506 778 1057 950 820 899 939 -13.7  15 3
Culture & Leisure (B) 
Gross cost per attendance at Sports facilities (£) 22.46 3.11 2.66 1.87 1.63 3.77 4.40 -12.7  3 1
17 Cost per Library visit (£) 3.53 3.21 7.15 5.64 5.23 2.72 4.84 -7.3  28 5 
Cost of Museums per visit (£) N/A1 N/A1 N/A1 N/A1 N/A1       
Cost of Parks & Open Spaces (£) per 1,000 population 14,539 17,848 17,353 18,652 16,882 21,998 25,647 -9.5  8 2 
% of adults satisfied with Libraries (rolling 4 years) 82.9 82.3 79.3 78.0 68.3 65.3 69.5 -9.7  14 5 
% of adults satisfied with Parks and Open Spaces
(rolling 4 years) 85.1 85.7 86.3 85.3 82.3 83.7 84.7 -3.0  22 6
18 % of adults satisfied with Museums and Galleries
(rolling 4 years) 64.1 62.3 58.3 57.0 45.0 67.0 62.9 -12.0  28 8
Page 74

Page 75

Note Indicator Description
Moray National
Average 
Family 
Group
Average
Relative
Change
Since previous
year
Rank
Latest
result
2020/21 2021/22 2022/23 2023/24 2024/25 Latest
result
Latest
result
%
change 
Short
Term
Trend
Nat
(32)
FG
(8) 
% of adults satisfied with Leisure Facilities (rolling 4
years) 72.4 74.7 71.3 69.7 65.0 65.0 68.5 -4.7  18 6
Environmental Services (B) 
Net cost per Waste collection per premises (£) 41.75 39.57 42.29 41.45 35.10 77.26 76.78 -15.3  2 1 
Net cost per Waste disposal per premises (£) 122.43 119.27 107.92 105.58 102.53 104.45 103.26 -2.9  15 5 
Net Cost of Street Cleaning (£) per 1,000 population 8,874 9,531 9,805 8,675 8,083 17,869 15,451 -6.8  3 1 
Street Cleanliness Score N/A1 N/A1 N/A1 N/A1 N/A1       
Cost of Maintenance per Kilometre of Roads (£) 5,162 6,038 7,034 7,608 6,827 13,629 13,954 -10.3  5 1 
% of A Class roads that should be considered for
maintenance treatment (rolling 2 years) 26.6 23.2 24.1 26.8 27.0 30.6 28.3 0.2  14 4 
% of B Class roads that should be considered for
maintenance treatment (rolling 2 years) 22.3 18.3 18.4 21.0 20.5 34.6 29.6 -0.4  2 1 
% of C Class roads that should be considered for
maintenance treatment (rolling 2 years) 21.3 19.3 20.6 22.7 24.7 34.2 32.3 1.9  5 1 
% of unclassified roads that should be considered for
maintenance treatment (rolling 2 years) 35.0 32.0 30.3 29.3 32.0 36.2 35.7 2.7  11 2 
Cost of trading standards and environmental health (£)
per 1,000 population 22,927 28,184 25,607 24,352 23,313 21,671 19,761 -4.3  20 7 
Cost trading standards, money advice & citizens
advice (£) per 1,000 population 5,729 5,800 6,460 5,918 5,547 7,203 5,887 -6.3  10 3 
Cost of environmental health (£) per 1,000 population 17,199 22,384 19,148 18,434 17,767 14,469 13,874 -3.6  23 7 
% of total household waste arising that is recycled 54.9 52.2 57.8 56.2 56.7 44.3 52.0 0.5  2 1
19 % of adults satisfied with refuse collection (rolling 4
years) 69.8 71.7 76.0 75.7 75.3 78.3 79.0 -0.3  25 7 
% of adults satisfied with street cleaning (rolling 4
years) 58.3 58.7 62.7 57.7 55.0 57.0 63.5 -2.7  22 8
H ou si ng Se rvi ce s (A )  Gross rent arrears (all tenants) as at year end as a % of
rent due for the reporting year 3.2 3.8 4.5 4.7 3.3 8.6 7.4 -1.4  1 1
Page 75

Page 76

Note Indicator Description
Moray National
Average 
Family 
Group
Average
Relative
Change
Since previous
year
Rank
Latest
result
2020/21 2021/22 2022/23 2023/24 2024/25 Latest
result
Latest
result
%
change 
Short
Term
Trend
Nat
(32)
FG
(8)
Note: Ranking relates to 26 Local Authorities 
% of rent due in the year that was lost due to voids
Note: Ranking relates to 26 Local Authorities 1.2 1.2 1.0 0.7 0.7 1.7 1.4 -0.0  4 1
20
% of council dwellings meeting Scottish Housing
Quality Standard
Note: Ranking relates to 26 Local Authorities
93.8 6.3 15.5 22.6 43.7 82.9 70.8 21.0  26 6 
Average number of days to complete non-emergency
repairs
Note: Ranking relates to 26 Local Authorities
6.1 8.0 5.7 5.7 6.3 10.1 14.2 10.9  4 1 
% of council dwellings that are energy efficient
Note: Ranking relates to 26 Local Authorities 57.4 60.4 N/A3 N/A3 N/A3      
Economic Development (B)
21
% Unemployed People Assisted into work from
Council operated / funded Employability
Programmes
5.3 5.9 10.8 5.0 10.4 14.2 12.6 5.4  25 6
22 Cost per Planning Application 5,379 5,949 6,930 6,913 9,931 6,938 9,024 43.7  27 5 
Average time (Weeks) per Planning Application 6.7 6.2 6.3 7.2 8.5 14.3 10.0 17.2  8 4 
% of procurement spent on local small / medium
enterprises 23.6 25.2 24.8 23.6 26.8 31.5 26.7 3.2  18 4 
No of business gateway start-ups per 10,000
population 9.6 12.7 11.3 11.0 11.4 12.3 13.8 3.6  21 5
23 Investment in Economic Development & Tourism per
1,000 population (£) 41,775 52,031 89,857 80,561 89,085 138,745 181,001 10.6  26 8
24 Proportion of people earning less than the living
wage (%) 21.5 19.4 13.8 14.4 16.2 11.3 13.2 1.8  25 7 
Proportion of properties receiving superfast
broadband (%) 85.7 85.6 87.2 87.8 93.0 97.1 96.7 5.2  24 7 
Town Vacancy Rates (%) 10.9 10.6 10.6 14.1 14.0 11.4 13.2 -0.1  21 5 
Immediately available employment land as a % of total
land allocated for employment purposes in the local 34.8 14.9 14.9 14.9 9.7 21.3 17.4 -5.2  19 3
Page 76

Page 77

Note Indicator Description
Moray National
Average 
Family 
Group
Average
Relative
Change
Since previous
year
Rank
Latest
result
2020/21 2021/22 2022/23 2023/24 2024/25 Latest
result
Latest
result
%
change 
Short
Term
Trend
Nat
(32)
FG
(8)
development plan 
Gross Value Added (GVA) per capita (£) 24,619 26,594 28,144 28,220 N/A3
(Apr 2026) 30,581 23,811 0.3  9 2 
Claimant count as a % of working age population (%)  5.3 3.0 2.5 2.3 2.4 3.1 2.6 0.1  11 4 
Claimant count as a % of 16-24 population (%)  7.7 3.3 3.0 2.7 2.9 3.3 3.2 0.2  12 3
Financial
Sustainability (B)
25 Total useable reserves as a % of council annual
budgeted net revenue 25.1 26.3 24.8 19.0 13.8 20.5 18.1 -5.3  25 6 
Uncommitted General fund Balance as a % of council
annual budgeted net revenue 7.2 2.2 2.1 2.3 2.1 2.0 2.3 -0.2  12 4
26 Ratio of Financing Costs to Net Revenue Stream 8.0 8.3 8.7 8.7 10.8 6.0 6.3 2.0  31 8 
Ratio of Financing Costs to Net Revenue Stream –
Housing Revenue Account 21.6 20.7 22.0 23.6 30.1 20.7 24.5 6.5  18 7 
Actual outturn as a % of budgeted expenditure 89.6 91.1 93.4 97.1 100.4 100.1 100.1 3.2  9 1 
Reliance on Reserves as a % of net expenditure   4.0 1.2 0.0 0.6 0.8 -1.2  1 1
Climate Change
(B) 
CO2 emissions area wide per capita 4.13 4.72 4.37 4.10 N/A3
(Jul 2026) 4.59 5.18 -6.2  17 4
27 CO2 emissions area wide: emissions within scope
of LA per capita 6.44 7.30 6.80 6.54 N/A3
(Jul 2026) 4.04 4.9 -3.9  32 8
28 CO2 emissions from Transport per capita 29.6 36.12 44.79 38.59 40.92 29.38 26.67 4.5  29 8 
CO2 emissions from Electricity per capita 30.65 33.6 30.91 32.57 32.92 45.6 39.11 1.1  5 3 
CO2 emissions from Natural Gas per capita 45.97 50.10 45.83 44.15 41.72 55.52 47.88 -5.5  5 2 
N/A1  Data no longer collected nationally / locally.
N/A2 Result below 5; not published to protect confidentiality.
N/A3 Data not yet published. 
Page 77

Page 78

Page 78

Page 79

Report to: Corporate Committee Meeting Date: 26 May 2026  
Report by: Head of People, Change and Community Strategy      
Author: Katrina McGillivray Contact
Email:
katrina.mcgillivray@moray.gov.uk 
Subject: Health and Safety Annual Report 2025 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to consider and note the annual Health and Safety report
along with progress outlined and approve proposed future actions.  
1.2  This report is submitted to Committee in terms of Section III (B) (24) (c) of the Council’s
Scheme of Administration relating to the recruitment, training and development, health,
safety and welfare policies and practices of the Council.  
2.  SUMMARY  
2.1  As part of the Councils arrangements for ensuring the safety of employees and others who
may be affected by its actions in accordance with the Health and Safety at Work etc Act
1974, the annual report is provided for 2025, summarising the Councils Health and Safety
performance corporately, based on statistics for the period 1 January 2025 to 31
December 2025.  
3.  RECOMMENDATIONS 
3.1  It is recommended that Committee:   
i)  consider and note the content of the annual health and safety report, as
outlined in Appendix 1 and the progress towards the outcomes established in
the last report; and   
ii)  approve the proposed future actions for 2026.   
Katrina McGillivray
Service Manager Organisational Development and Change 
4.  BACKGROUND AND CONTEXT
Item 10.
Page 79

Page 80

4.1  The following outlines the main elements required of the Council to ensure the
safety of employees and others who may be affected by its actions:
• Making plain the organisation’s commitment to have good standards of health and
safety management;
• Defining the roles that people at all levels play in ensuring the good standards are
maintained;
• Having systems in place to ensure awareness of hazards and assessment of risks
to employees, customers, partners and others who may be affected by the
Council’s activities;
• Having in place effective arrangements to eliminate or control those risks;
• Monitoring the system in place and reviewing it on an ongoing basis;
• Providing access to health and safety advice and support;
• Engagement with employees at all stages of the process to ensure adequacy. 
4.2  The annual report on corporate health and safety provision within the Council supports
this approach.  
4.3  Reporting is also in place at a service level. Harbour incidents are reported quarterly and
annually to Economic Development and Infrastructure Services Committee as part of the
reporting on Marine Safety. Violence and Aggression in Schools is the subject of separate
reporting to Education, Children’s and Leisure Services Committee and to the Community
Planning Board. Progress around policies and procedures, training and support for those
working in schools continues in accordance with the agreed programme of activity. 
5.  PROPOSALS  
5.1  It is proposed that committee note the decrease in incidents reported and that work
continues on a targeted basis to continue to reduce the overall number of incidents.  
5.2  It is proposed that committee note that incidents relating to Violence and Aggression
remain an area of focus, with some increase reported within a Supported Accommodation
facility and within Schools. Work is continuing to support the implementation of the
agreed planned programme of activity, alongside actions arising from engagement with
trades union representatives and front-line staff in Schools. The increase is consistent
with the national context with a rise in reported incidents across local authorities in
Scotland.  
5.3  It is proposed that Committee approve the actions outlined in section 6 of the Annual
Report 2025 to continue to build on progress made to date and further develop key areas
identified.  
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Page 80

Page 81

Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  x
Policy and Legal x 
Financial  x
Risk x 
Staffing x 
Best Value and Transformation  x
Property  x
Information Communications Technology/Digital x 
Equalities. Social Inclusion and Economic Impact   x
Climate Change and Biodiversity Impact  x 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population 
6.3  Policy and Legal 
The Council has a statutory duty to ensure the health and safety of staff and people who
use Council services.  An annual report is an effective method of recognising
achievement, progress made and highlighting opportunities for further improvement.  
6.4  Financial 
There are no financial implications arising directly from this report. Accidents can have
implications for Council resources and may result in losses that are difficult to quantify
as they are contingent on the unknown specifics of a future accident. In addition, there
may be financial implications arising from claims made by employees and third parties
arising from injuries sustained and/or losses incurred as a result of accidents and
incidents. 
6.5  Risk
Health and Safety is included within all levels of the Council’s risk register. There is a risk
of claims from employees and third parties arising from accidents and incidents. Over the
course of 2025 there were no claims settled in accordance with the Council’s insurance
Page 81

Page 82

provisions. Risks are monitored through Departmental Health and Safety Forums and are
escalated to the Central Health and Safety Committee as appropriate.    
6.6  Staffing 
Staff time is required to implement the actions set out in the report. This will be
accommodated within existing resources by adjusting priorities to be worked on.  
6.7  Best Value and Transformation   
None 
6.8  Property 
None  
6.9  Information Communications/Technology/Digital 
Continued support required for the revised incident reporting system and liaison regarding
the new customer relationship system.  
6.10  Equalities, Social Inclusion and Economic Impact 
None  
6.11  Climate Change and Biodiversity Impacts
None  
7.  CONSULTATION  
7.1  This report has been prepared in consultation with the Head of People, Change and
Community Strategy, CLT, ECLT and Central Health and Safety Committee and any
comments made have been incorporated into the report. 
8.  BACKGROUND PAPERS  
8.1  None   
Page 82

Page 83

Health & Safety Annual Report - Appendix A
2025 
Page 83

Page 84

Introduction 
The Health and Safety at Work etc Act 1974 requires employers protect the health,
safety and welfare of all employees, clients, visitors and the general public.  To ensure
all work and operations are conducted in line with these regulations, Moray Council
operates a Health & Safety management system based on a widely accepted model of
Planning, Doing, Checking and Acting.  To help with this, any incidents are logged and
details used to identify where preventative and protective measures may be needed.   
This appendix provides an overview of recorded incidents during the period January to
December 2025.   
Health & Safety Incidents – Moray Council 
During 2025, 170 Health & Safety incidents were reported by Moray Council, a decrease
of 7.6% compared to 2024.  Since 2021, incidents have remained relatively stable, only
varying by 14 over the period. An average of 177 incidents were recorded over the five-
year period (Figure 1).   
Figure 1 
60% of all incidents in 2025 were recorded by Education (102 incidents) with the
remainder recorded across Environmental & Commercial Services (44), Health & Social
Care (19), Housing & Property (4) and Economy, Environment & Finance (1).  No
incidents were recorded by Education & Resources, Governance, Strategy &
Performance or HR, ICT and Organisational Development.   
RIDDOR Incidents (those falling under the Reporting of Injuries, Diseases and
Dangerous Occurrences Regulations 2013) decreased in 2025 to 7 (Figure 2).  Three
incidents were recorded within both Education and Environmental & Commercial
Services, with the remaining incident occurring within Housing & Property services.
(Table 1 & Figure 2).   
Page 84

Page 85

Table 1
RIDDOR Incidents -
How was it caused? Education
Environmental
& Commercial
Services
Housing
&
Property
Hit by a
moving/falling/flying
object
1    
Slip, trip or fall on the
same level 2    
Manual handling   1  
Other   2  
Hit by a fixed object     1
Anonymised data from the North of Scotland Health & Safety Liaison Group shows the
incident rate for Moray has decreased in 2025. Moray remains the second lowest Local
Authority with a rate of 1.88 incidents per 1,000 FTE employees (Figure 3).   
Figure 3 
Health & Safety Incidents – Education 
Incidents recorded by Education increased in 2025 by 8 (9%) to 102.  59 (58%) took
place within a Secondary School setting, a significant reduction from the proportion
witnessed in 2024 (72%). In contrast 33 incidents (32%) occurred in Primary schools,
increasing from 19 (20%) in 2024 (Figure 4).   
Figure 4 
1
3
6
9
7
0
2
4
6
8
10
2021 2022 2023 2024 2025
Health & Safety Incidents -RIDDOR
Figure 2
Page 85

Page 86

76 incidents (75%) involved a school pupil.  Those involving Employees/Contractors
increased to 26 (25%). No incidents involved members of the public. (Figure 5).  
Figure 5 
Incidents involving Employees/Contractors, were due to several different causes with
small increases noted in ‘Slip, trip or fall on the same level’, ‘Hit by a
moving/falling/flying object’, ‘Exposure to harmful substances’, ‘Hitting a fixed or
stationary object’ and ‘Other’ categories. (Table 2). 
Table 2 
Overall, most incidents within Education during 2025 were classed as a ‘Minor Injury’
(Figure 6).  ‘Slip, trip or fall on the same level’ and ‘Other’ were the most common cause
(Table 4) with a ‘Minor wound e.g. a small cut or graze’ the most common injury (Table
3).   
Education - Incidents involving Employees/Contractors 2020 2021 2022 2023 2024 2025
Slip, trip or fall on the same level 14 12 3 4 11 14
Hit by moving/falling/flying object 4 2 2 3
Manual Handling 2 2
Sport/Play 1 2 1 1 2
Aggressive incident 1 2 1 1 1
Contact with machinery/material being machined 1 1
Contact with sharp object or tool 1 1
Defective equipment/building 1 3 1
Contact with electricity 1 1
Exposed to a harmful substance 1 1
Exposed to fire or explosion 1
Fall from a height 1 1
Hitting a fixed or stationary object 1 2
Other 1 5
Service User Action 1
Trapped by something collapsing/overturning/jamming/closing 1
Grand Total 23 22 13 8 21 26
Page 86

Page 87

Figure 6 
Table 4   
Health & Safety Incidents – Environmental & Commercial Services 
There was a notable reduction of incidents recorded by Environmental & Commercial
Services during 2025 from 70 to 44 (37%).  Apart from ‘Waste Services’, showing a slight
increase of four incidents, all other services recording more than one incident
witnessed significant reductions. Most notably, incidents within Open Spaces, Roads
Maintenance/ fleet services and catering all witnessed significant reductions (40%, 80%
and 57% respectively (Figure 7).   
Figure 7 
Minor Injury - How Was it Caused Total
Slip, trip or fall on the same level 21
Other 20
Hit by a moving/falling/flying object 10
Hit by moving/falling/flying object 6
Exposed to temperature extremes 5
Hitting a fixed or stationary object 2
Manual Handling 1
Not provided 1
Fell out of a tree 1
Inappropriate equipment used 1
Defective equipment/building 1
Fall from a height 1
Total 70
Minor Injury - What was the injury Total
Minor wound e.g small cut, graze 15
Otherstrain/sprain 12
Bruising 9
Minor burns/scalding 8
Bruising 8
Other 3
Bruising & Minor wound eg small cut, graze 3
Puncture type injury 2
No significant injury 2
Back injury 2
Eye injury 2
Serious wound eg deep cut 1
Fracture/bone break 1
Bruising/Mental stress 1
Loss of consciousness 1
Grand Total 70
Table 3
Page 87

Page 88

Across Environmental & Commercial Services, the most common type of incident was
‘Minor Injury’ (Table 5).  ‘Hit by a moving object’ and ‘Slip Trip or fall’ were the most
common causes of accidents, accounting, collectively, for 44% of all causes (Figure 8). 
Environmental & Commercial Services have received targeted Health and Safety
interventions over several years including, the revision of departmental handbooks and
various audits of documentation such as reviewing risk assessments within Catering
and Roads Maintenance. The reduction of incidents within the service may be due to
this improved H&S culture becoming embedded within the service. 
Figure 8 
11 incidents resulted in ‘Equipment or building damage’ (Table 6).  5 were recorded by
Open Spaces due to Grass Cutting/Strimming operations that led to flying debris
damaging windows, cars or garden furniture. Care is taken when carrying out strimming
operations, but the nature of the task makes it very difficult to add additional control
measures. A further four were recorded by Waste services, all related to driving
incidents. 
Table 6 
Minor Injury - What was the injury Total
Building/equipment damage 11
Strain/sprain 9
Minor injuries 6
Scalding/Burns 5
Bruising 4
Other 3
Fracture/broken bones 2
Back/injury 2
No significant injury 1
none 1
Total 44
Minor Injury - How was it caused Total
Hit by moving/flying object 10
Slip trip 10
Other 7
Hit by fixed object 7
Manual handling 4
Hitting a fixed or stationary object 2
Trailer unhitched from vehicle 1
Exposed to a harmful substance 1
Contact machinery 1
Sports outdoor activity 1
Total 44
Table 5
Page 88

Page 89

Health & Safety Incidents - Housing & Property 
Housing & Property incidents fell significantly from 15 in 2024 to only four recorded
incidents in 2025, all relating to employees / contractors. Two incidents involved
contact with electrical cables and one incident resulted in a sprained ankle. The
remaining incident, recorded as RIDDOR reportable, was caused by the use of
inappropriate access equipment which caused the contractor to fall whilst accessing
the property roof.    The last two years have seen a number of health & safety training
courses delivered to staff within Housing & Property, such as safer driver training and
robust manual handling training. This may have led to the reduction of musculoskeletal
injuries and driving incidents across the service. 
Health & Safety Incidents - Health & Social Care 
During 2025, 19 incidents took place within Health & Social Care; all were recorded by
the Care at Home Service. Eight were categorised as ‘Manual Handling’, five as ‘Slip, trip
or fall’, three ‘Animal bites’, two recorded as ’Other’ and one ‘Needlestick injury’. 
Page 89

Page 90

Violence & Aggression Incidents – Moray Council 
In 2025, Violence & Aggression incidents recorded by Moray Council, increased by 233
(6.5%) to 3,808 (Figure 9).  Of particular note, was the significant increase of incidents
recorded within Corporate Services, which more than doubled from 18 to 40 incidents
between 2024 and 2025. Of these 40 incidents 30 were recorded as ‘Verbal Abuse’, a
marked increase from the eight in 2024. Supported Accommodation recorded 118 more
incidents in 2025 showing a 25.5% increase. Education also witnessed on increase, but
to a much lesser degree 93 (3%). 
Figure 9 
Violence & Aggression Incidents – Education 
Between January and December 2025, 3188 Violence & Aggression incidents were
recorded by Education, an increase of 93 (3%) from 2024.  Incidents within a Nursery
and Primary School setting both increased, with a significant increase of 221% (14 to
45) seen within nursery settings. Secondary Schools recorded a decrease of 55 (10%)
(Figure 10). 
Figure 10 
Page 90

Page 91

Since 2023 Violence and Aggression incidents within Education have been recorded
using an electronic system. Incident types changed with all categories of an incident
included rather than just the main category of each resulting in figures significantly
increasing.  Since 2023, where 3,327 incidents were recorded there has been a small
overall decline (4%). 
For 2025, the 3,188 recorded incidents covered a total of 10,821 incident types. 
‘Physical Assault (No Weapon)’ was the most commonly occurring, accounting for 20%. 
‘Antisocial/Disruptive Behaviour’ (1,985) and ‘Verbal Abuse/Threats’ (1,631) were the
next most commonly occurring. Collectively these three incident types were
responsible for more than half of all types (Figure 11). Most notable was the significant
increase in the number of incidents involving ‘Malicious Communication and Slander’
by 200% from 401 in 2024 to 1,206 in 2025, followed by incidents involving ‘Vandalism’
which increased by 72% (441 to 758). Incidents involving ‘Threatening/Menacing
Behaviour’ and ‘Threat of Physical Assault (No Weapon)’ both saw significant decreases
of 41%. The proportion of either threats of or actual physical assaults reduced slightly
between 2024 and 2025 by 5%. 
Figure 11 
The introduction of an online reporting form has improved the analysis of Violence &
Aggression incidents within Education and supported more targeted interventions.
Mandatory trauma-informed training has been introduced, and work is continuing to
strengthen support for staff as part of wider health and wellbeing improvements. A joint
working group with officers and trade unions is reviewing recording processes and
progressing actions to support staff. The move from BSS to CALM is showing
encouraging early progress, with a reduction in incidents so far this year and positive
feedback from staff. The CIRCLE inclusive classroom approach is also being rolled out
across the service. Central ASN outreach teams are using violence and aggression data
to target support to schools, promoting a whole-school approach to meeting
behaviours and needs. A zero-tolerance campaign on work-related violence will be
Page 91

Page 92

launched in 2026, focusing in turn on different services and interaction types, including
malicious communications and slander.   
Violence & Aggression Incidents – Supported Accommodation   
During 2025, 580 Violence & Aggression incidents were recorded at the Supported
Accommodation Facility, 118 more than in 2024. Due to an ongoing system issue,
service-wide data on injuries sustained is not currently available (Figure 12). Throughout
the year, staff continued to use Positive Behaviour Support (PBS) strategies while
supporting 23 service users, a 65% increase since 2024. Individual needs have been
closely monitored, with adjustments made to reduce anxiety and support stability.
Longer-term work is ongoing to secure the most suitable support and accommodation
where needed.
Since 2024, there have been issues with the particular Incident Reporting Software
used in Supported Accommodation and while incidents are recorded it is not possible
to extract details such as physical interventions and injuries sustained on a whole
service basis. Work is continuing with ICT to produce a new recording system that will
be able to record this level of detail. 
Figure 12 
Violence & Aggression Incidents – Corporate   
Forty Violence & Aggression incidents were recorded Corporately during 2025, 22 more
than 2024. (Figure 13).  ‘Verbal Abuse’ incidents remain the most commonly occurring,
accounting for 75%. Incidents involving ‘Physical Assault’ and ‘Disruptive Behaviour’
both halved over the period. (Figure 14).   The increase in Corporate V&A incidents is due
to the increase in reports from the Care at Home service; this has been precipitated by
an increased focus on awareness around reporting and recording all incidents which
may not have been the case in previous years. 
Page 92

Page 93

Figure 13   
Figure 14 
Working Days Lost to Industrial Injury 
The number of working days lost to industrial injury can fluctuate considerably due to
the varying circumstances.  Often only one case can contribute to a significant
increase.   
Working days lost have fallen slightly during 2025 to 162.  This covers 12 incidents, with
3 leading to a longer-term absence due to broken bones / Ligament damage. (Figure 15) 
Page 93

Page 94

Figure 15 
Page 94

Page 95

APPENDIX 1 
MORAY COUNCIL
HEALTH AND SAFETY ANNUAL REPORT
(January 2025 to December 2025)
1 Purpose  
1.1 The purpose of this report is to provide information on the performance of the
Council in ensuring the health and safety of the workforce and people who
use our services. This is done through the utilisation of monitoring data and
includes recommendations for improvements required to procedures and/or
systems.  
1.2 The national context for similar organisations on incidents and enforcement
action is also considered for the purposes of shared learning.   
2 Summary of Key Themes  
2.1 Continued progress on the priorities identified in the 2024 report has been
made, including a focus on updating policy and guidance documents across
a wide variety of key health and safety topics. These include an updated and
refreshed Fire Safety Policy, Electrical Safety Guidance and an updated
Asbestos Management plan. Fire risk assessment continues to feature
heavily, with a risk based, planned programme of work providing an important
framework. All Moray Council premises have an up-to-date Fire Risk
Assessment in place and reviews, and reassessment are being undertaken in
a timely manner. 
2.2 Systems, process and format improvement has continued to be a key focus
in 2025 with considerable work undertaken on a range of guidance
documents that have been reviewed and updated. This includes updated
guidance on risk assessment for Head Teachers which is available on the
interchange following approval at LNCT and updated Personal Emergency
Evacuation Plan guidance. A specific moving and handling policy has been
produced and accepted which is required to participate in the Scottish
Manual Handling Passport Scheme. Progress with the development of
Electronic Incident reporting in Education has been made with the roll out of
the form due for term one 2026 /27. The introduction of this system supports
improved efficiency, reducing the time required for manual entry of data.
Further work to develop bespoke arrangements to support Education
Services will be taken forward in collaboration with ICT. The implementation
of the Employee Protection Marker System, which is a premises-based
marker system, has been delayed by the introduction of a new Customer data
management system. The new system will have the capacity to record
markers and further detailed work is required to ensure the system can
support the implementation of the agreed Employee Protection Marker
System. Consideration is being given to the resource required to ensure this
work is adequately and appropriately supported to ensure all services are
considered and the scheme is suitable for all users.    
Page 95

Page 96

2.3 Health and Safety Culture continues to be an important theme with actions
and interventions implemented on a targeted basis as required and more
generally through embedding messaging and communication through the
existing framework, supported by Comms and OD colleagues as appropriate
to requirements. 
The outcomes from the Health and Safety section of the 2025 Employee
Survey, which provides some indication of the culture of Health and Safety
within in the workplace are as follows;   
• Over three quarters of respondents agree that they are given the
proper equipment to keep them safe and protect their health (82%). 
This is the same figure as 2023.   
• There is an increase of 4% points from the 2023 results (56% to 60% in
2025) with regards to respondents feeling involved in decisions
regarding health and safety 
• Positively, there was an increase in the number of respondents (64%)
who feel that their mental health is sufficiently supported (from 59% in
2023), and there was no change in the percentage who feel able to
maintain and/or improve their mental health and wellbeing during the
last year (59%).   
• There was little or no change in the number of respondents feeling
able to cope well (73%, down by 1% from 2023) and over seven out of
ten respondents feel they have a good work / life balance (72%) which
is the same as in 2023. 
The outcomes from the survey will help target communications and
interventions in those services which were highlighted in the survey as
requiring improvement.  
2.4 Incidents based on human error continue to occur, particularly in some
safety critical services and work continues to eliminate the underlying
causes. With organisational development support, improvements in
embedding health and safety awareness into the workforce continues.  
2.5 Incidents of work-related violence have increased slightly across all Council
service areas in 2025. Work continues to support the reduction of incidents
of work related violence across all services, including targeted training in
dealing with challenging behaviour and a zero-tolerance campaign is due to
be launched during 2026 in association with Organisational Development
and Communications colleagues which will improve messaging to the public
and users of services that violence and aggression towards staff is
unacceptable. 
3 Review and Monitoring of Council Performance  
3.1 Statistical Review
Page 96

Page 97

3.1.1 Appendix A sets out the analysis of health and safety incidents that were
reported during the year January – December 2025, with comparison to
previous years’ performance.  
3.1.2 The main points to note are: 
a) The number of incidents reported in 2025 was 170, down by 7.6% when
compared to 2023 (184 incidents), this is down 42% (128 incidents less)
when compared with 2019.  Incident trends within services will continue to
be monitored to ensure targeted support is provided where required.   
b) Following a similar trend as in 2024, Education has the most reported
incidents, followed by Environmental and Commercial Services, followed by
Health & Social Care then Housing and Property Services.   
Violence and aggression involving staff remains a key priority. In 2025, 3,808
incidents were recorded, an increase of 233 (6.5%) on 2024, with most
reported in Education as outlined in paragraph 3.3.6. Within primary,
secondary and ELC settings, 3,188 incidents were recorded, up 3% (93
incidents) on 2024. In response, Education continues to lead targeted work to
improve staff safety and support positive behaviour, informed by both local
data and national learning. While the national trend is also reflected in Moray,
the data shows that most incidents involve a relatively small number of
pupils. Improved reporting is providing better insight, and this is helping to
shape action through a joint working group with officers and trade unions.
Early progress is encouraging: the move from BSS to CALM is showing a
reduction in incidents so far this year, staff feedback has been positive,
CIRCLE is being rolled out across the service, and ASN outreach teams are
targeting support where it is most needed.   
d) During 2025, a Supported Accommodation Facility reported 580 Violence
& Aggression incidents, up from 462 in 2024 (up 118).  Throughout 2025, staff
have continued to make use of Positive Behaviour Support (PBS) strategies
however they continue to face some challenging behaviour.  The needs of
service users have been closely monitored and where needed, modifications
have been made to help reduce anxieties.  Longer term, work is ongoing to
secure more suitable support for some service users. The number of users of
this service has risen by 65% since 2024 which will go some way to explain
the increase in V&A incidents within the service.     
e) Elsewhere in the Council, 40 incidents of Work-Related Violence were
reported, up from 18 in 2024.  This increase in recorded incidents is due to
increased focus on recording and reporting incidents within the Care at
Home team and ensuring that all instances of Work Related Violence are
logged correctly and added to the database. As with Supported
Accommodation the number of users of the Care at Home service has also
increased which will help explain the increase in recorded incidents.  
Page 97

Page 98

f) Work on the incident reporting processes for both workplace incidents and
incidents involving violence and aggression has progressed significantly
supporting improvement in the reporting of data and its analysis.   
g) Quarterly and annual reporting of harbour incidents to the Harbour Board
indicate a very low number of incidents and a significant difference from the
previous year (10 incidents).  There was 1 near miss where the person was
nearly struck by a falling slate following a significant storm event and one
where a member of the public drove his push bike over a cover which he says
caused him to come off his bike.  There were no common factors in the 2
incidents.     
3.2 Summary of issues arising from Incidents/Accidents/Interventions 
3.2.1 The following summarises some of the main issues arising from incidents and
accidents to illustrate the nature and range of risks the council has faced and
to inform decisions on improvements for the future with appropriate remedial
actions.   
• Violence and Aggression continues to feature heavily, and appropriate
actions and interventions are being addressed through the measures
outlined at para 3.3.6   
• A number of slip incidents during a spell of inclement weather in Jan
2025 highlights the requirement for adequate winter maintenance
plans to be produced and implemented, when required, during the
year. All services were asked to ensure that Winter Maintenance plans
were up to date, and services had the equipment and personnel
available to implement the plan in each location for winter 25/26   
• A trailer incident identified issues with hitch attachments on some
commercial vehicles. All relevant vehicles were inspected, a small
number were repaired, and towing was paused until the work was
complete. This led to updated workshop procedures and pre-use
vehicle checks.  
3.3  Review of Progress 
3.3.1 Health and Safety activity is set out in the annual action plan and then
monitored through the council’s performance management framework via
the service plan and a more detailed workforce plan. 
3.3.2 The following outlines the progress that has been made in addressing action
areas established in the 2024 Health and Safety Annual report. 
3.3.3 Accident/Incident: 
Page 98

Page 99

a) Audit high risk services or issues (Continue with programme of audits
in accordance with the timescales for completion according to
prioritisation in order of importance.) 
Audits have been carried out by the H&S team in Care at Home service to
ensure accidents and incidents of Violence & Aggression were being
documented and recorded correctly. Of note is the increase of incidents
being reported within Care at Home between 2024 and 2025; whilst further
analysis is required, it appears that the audit has highlighted to staff, the
need to report all incidents regardless of whether time off work was required. 
b) Monitor the implementation of Driving Safely Policy and guidance
within targeted services 
Routine monitoring is in place through Departmental Health and Safety
Forums, and any actions required as a result are managed through this
process. All reversing incidents are reported and investigated by the service
as a priority. 
c) Produce updated Accident / Incident investigation guidance (as part of
launch of the changed incident reporting system) 
Updated Accident / Incident investigation guidance has been produced and
has been issued in co-ordination with and as part of the launch of the
electronic report form.
3.3.4  Implement changes to the Incident Reporting System including launch and
communications across the organisation. 
Good progress has been made with a review of the incident reporting
process, including the development of an electronic form. The form has been
in use within Environmental & Commercial Services since March 2024 and
has been well received by users. The further roll out of this form to Education
will take place in August 2026. The electronic recording system for Violence &
Aggression in Education has now been in place for over two years and any
feedback from users on this system has been taken into consideration when
finalising the corporate systems.  
3.3.5 Implement changes to Safety Management System: 
The Corporate Fire Safety Policy has been reviewed with a revised Policy and
supporting guidance being presented to Corporate Committee in May 2026.   
The review of the Health and Safety Policy is referenced below under review
of Safety Management System.  
3.3.6 Violence and Aggression – continue to support the work required in
accordance with the priorities identified by Head of Education.   
Work is continuing to support the implementation of identified priorities in
this area. The ASN Management Group continues to review Violence &
Aggression incidents and resources are directed to provide support in
schools where there is a developing trend that causes concern. 
The working group which was set up with participation from HR, Trades Union
representatives, Education leadership staff and staff from schools at all
levels continues to support relevant and appropriate actions informed by the
data on incidents and experiences of staff and is now led by Education
services. 
Page 99

Page 100

It is noted that although the number of reported incidents has increased
slightly for 2025 a reduction of incidents was recorded in secondary schools.
A meeting has been organised with ELC to investigate the increase in
reported V&A incidents in nurseries. Whilst initial investigation suggests this
is related to improved knowledge of reporting requirements for staff rather
than an increase in incidents, the data will be explored in further depth and
appropriate measures and actions agreed with the service. In addition, the
national context will continue to be monitored, and any implications and
changes required will be taken forward as appropriate. 
3.3.7 Fire Risk Assessments: Continue to implement the fire risk assessment
rolling programme. 
Progress with the implementation of the refreshed rolling programme, which
uses a risk-based priority approach for fire risk assessment has been good.
The Health and Safety Team will continue to undertake the required
assessments according to the priority attributed to them.
3.3.8 Risk Assessment: Develop online training package. 
Significant work has been carried out with Education Services in particular,
and risk assessment guidance for Head Teachers has been produced. Work is
continuing on developing an appropriate training package, including a
blended learning approach as appropriate to the target audiences.  
3.3.1
0
Inspection: Continue to monitor Joint Inspection programme. 
A number of inspections have taken place over in 2025 within depots and
work is ongoing in liaison with Education Services to identify how inspections
in schools can be supported. 
One inspection of a school took place in 2025 with the assistance of the H&S
team, and an action plan has been drawn up to ensure any issues requiring
attention have been dealt with. The Programme continues to be monitored at
a service level through the Departmental Health and Safety Forums.
3.3.1
1
Risk Management: work with Organisational Development colleagues to
implement measures in targeted areas with high or increasing incident
reports. 
Work continues with OD colleagues, to ensure that the messaging on health
and safety culture is embedded within services and that appropriate
interventions are in place on a targeted basis, including, for example access
to training required. 
Further work on behavioural safety and links with other work outlined in the
plan for 2026, such as better incident reporting, incident investigation
training package, risk assessment online training packages are being
developed.
3.3.1
2
High level review of Safety Management System and identification of priorities
for the revision of policies, ensuring availability of up-to-date resources for
managers. 
The Health & Safety Policy for the organisation contains all the arrangements
that the Council has in place to manage Health & Safety and consists of a
large collection of supporting policies, procedures and guidance on the range
Page 100

Page 101

of areas that require to be managed. These form the basis of the Corporate
Health & Safety management system.   
Due to the range and complexity of these various areas, and the documents
in place to support these, the Policy/ Procedures are being reviewed in stages
with priority given to those areas that have been assessed as higher risk.   
Priority areas have been identified and for 2026, this includes the continued
review of the Health and Safety Policy.   
The focus for early 2026 will be on reviewing COSHH arrangements and
ensuring the approach, guidance and forms used within the council are up to
current standards.   
Audits are planned for HSCM and Education to ensure compliance with
current standards and regulations.   
Hand Arm Vibration (HAVS) audits will continue to be conducted within
Services that use handheld powered equipment, to ensure the Council is
meeting the obligations set out within the regulations. Training is planned for
2026 to ensure the necessary expertise and equipment is available in house
to undertake HAVs monitoring   
An online risk assessment training module is being developed to aid the
provision of risk assessment training across the Council.    
4 Benchmarking and National Developments 
4.1 Annual Incident Rate (AIR) figures based on RIDDOR (Reporting of Injuries,
Diseases and Dangerous Occurrences Regulations 2013) incidents for 2025
is 1.88 for Moray Council based on the number of Full Time Equivalent
employee numbers. 
In comparison, the AIR figures for 2024 were 2.41 2023 were 1.58, 2022 were
1.12, 2020 were 1.42 and 2019 3.17.     
Benchmarking with other local Councils indicates that, the AIR for Moray
Council is similar to or lower than the returned rate from members of the
North of Scotland Health & Safety Liaison Group (anonymised):  Moray 1.88,
LA1 1.62, LA2 1.89, LA3 2.18, and LA4 6.19  
4.2 The incident rate for 2025 is down slightly in comparison with previous years.
Figures available from the HSE for all UK employers in 2025 show a similar
trend, though comparing the Council with HSE data is difficult as the HSE
figures are generally sector based, whereas the Council is a multi-sector
organisation. 
4.3 Skillcast’s top 10 health and safety prosecutions for 2025 show the
continuing scale of fines for serious failings, ranging from £800k for a
construction company after an employee suffered serious injuries in a fall
Page 101

Page 102

from height to £6m for Cambridge County Council following multiple failings
in the operation of a guided busway that led to two fatalities. 
The top fine in 2025 was £6m. The top 10 also included a £2.48m fine after a
waste worker was killed by a reversing skip lorry, underlining the importance
of separating pedestrians and vehicles and using banksmen during reversing.
Other local authority prosecutions included Bury Metropolitan Borough
Council (£200k), after an employee was injured when a scissor lift toppled
while he was straightening a 20-foot Christmas tree, and Glasgow City
Council (£80k), after a member of the public was struck by a collapsing,
corroded lamppost.  
5 Conclusions and Proposed Developments  
5.1 A slight decrease in reported incidents but a slight increase in Work Related
Violence can be seen.    
5.2 Overall, in general terms there are no significant concerns highlighted as
regards the Council’s Health and Safety performance. The risks that have
been identified are being appropriately managed, with plans in place to
progress with addressing the concerns, including continued focus on work
related violence.  
5.3 Continued progress has been made on the issues reported on last year. Work
will proceed on the areas identified in accordance with the plans in place
which will be the subject of continual review, taking account of any
competing priorities and demands.  
5.4 Monitoring and audit work will continue particularly in relation to Work
Related Violence. Concerns regarding Violence and Aggression continue to
be managed and addressed through a planned approach within the services
where these types of incidents are most prevalent, supported by the Health
and Safety Team as appropriate. 
There is significant work underway in the Education service along with
interventions across schools and continuing work on a multi-agency
partnership basis. The relationship between the implementation of measures
as a result of the actions of the working group led by Education with the
statistics on WRV in schools will be explored in further detail starting with
reviewing incident data from ELC which as a service has shown the greatest
percentage rise in incidents. 
5.5 Further monitoring of Reversing Incidents and Driver behaviour will continue
in 2026 through the relevant Departmental Health and Safety Forums.  
5.6 Important progress on revising guidance, systems and processes has been
made with changes being implemented as required. The implementation of
the Employee Protection Warning Marker system in particular is a key piece of
work which will be taken forward in 2026 aligned with the new Customer
Relationship System. 
Page 102

Page 103

5.7 Work will also continue across the OD team in terms of utilising the range of
tools and techniques available and the framework for communications to
support managers in targeted areas to monitor and raise awareness amongst
their teams, including appropriate use of training interventions.  
6 Action Plan   
Actions Target for Completion 
Accident/Incident: Audit high risk
services or issues 
Continue with programme of audits
in accordance with the timescales
for completion according to
prioritisation in order of importance
Quarterly review 
Continue roll out of changes to the
Incident Reporting System. This has
been completed within E&CS
Term 1 2026 / 2027
Implement changes to Safety
Management System: 
Review of Health & Safety Policy with
focus on COSHH arrangements 
August 2026
Fire Risk Assessments:
Continue to implement the fire risk
assessment rolling programme 
Adhere to identified timescales for
completion according to
prioritisation in order of importance
Quarterly review
Violence and Aggression – continue to
support the work required in
accordance with the priorities
identified by Head of Education
In accordance with timescales
outlined in the work on Violence
and Aggression in Schools being
taken forward by the Head of
Education 
Risk Assessment: Develop online
training package 
July 2026
Inspection: Continue to monitor Joint
Inspection programme
Ongoing
Risk Management: work across OD to
implement measures in targeted
areas with high or increasing incident
reports 
Planned work to be implemented in
order of priority over the course of
2026
Employee Protection Markers –
Implementation of agreed approach 
December 2026
High level review of Safety
Management System and
identification of priorities for the
revision of policies, ensuring
Ongoing with outline plan of work
for first phase by June 2026
Page 103

Page 104

availability of up to date resources for
managers 
Page 104

Page 105

Report to: Corporate Committee Meeting
Date:
26 May 2026  
Report by: Executive Director Finance, Strategy and Transformation    
Author: Anne Smith Contact
Email:
hr@moray.gov.uk 
Subject: Employment Policy Framework Review 2025 -26 
1. PURPOSE 
☒ For Decision      ☐  For Information 
1.1 
1.2
The purpose of this report is to consider and approve the update on the
employment policy framework for 2025 -26 
To consider and approve a proposed future approach to the employment
policy review framework. 
1.3 This report is submitted to Committee in terms of Section III B (25) of the
Council’s Scheme of Administration relating to the formulation,
implementation and review of policies and practices for Council employees.  
2. SUMMARY  
2.1 This report provides an update on the employment policies reviewed during
2025 - 26 and seeks approval on the future approach to the employment policy
framework. 
3. RECOMMENDATIONS  
3.1 It is recommended that Committee approve:   
i) the changes to the Bullying and Harassment Policy. This policy has
been updated to reflect legislative changes, in particular, the
preventative duty with regards to prevention of sexual
Item 11.
Page 105

Page 106

harassment. Changes have been made to reinforce organisational
culture and leadership role commitment and to improve
navigation / user experience; 
ii) the changes to the Code of Conduct policy. This policy outlines the
standards of behaviour and conduct of employees across the
council. It has been updated to enhance user experience, reflect
current job titles and add clarification regarding conduct with
other employees and with Councillors. Roles and responsibilities
have been clarified including the role of the Comms Team and
guidance on the use of social media along with links to other
relevant policies; 
iii) the addition of Disability Leave to the Special Leave Policy to
reflect operational case management experience, good practice
and support wellbeing and attendance at work for employees with
a disability.  Guidance is included on purpose and application with
provision for up to 5 days special leave to be granted as
appropriate. Approve the allocation of 2 days special leave to
employees who volunteer to participate in an on call rota in the
event of requiring to mobilise the provision of rest centre(s) to
enable the council to fulfil its Emergency Planning responsibilities
under the Civil Contingencies Act (2004); 
iv) the changes to the Whistleblowing Policy. The changes include
clarifying roles and responsibilities (officers and witnesses) and a
review of the language, job titles and terminology; 
v) the changes to the Recruitment and Selection Policy to reflect
updated arrangements regarding sponsorship, legislative changes
to the PVG scheme, the Council’s approach to succession
planning and referencing trainee/ apprenticeship roles.  Language
and job roles have been updated; and   
vi) the changes to Equality and Diversity policy which includes the
amendment to Equality, Diversity and Inclusion policy which
better reflects the purpose and scope of the policy and best
practice.  Changes include use of gender-neutral language,
simpler navigation and providing examples for clarification, along
with an overarching statement which applies to all policies and
outlines fair and equal treatment of the workforce and potential
employees. 
4. BACKGROUND AND CONTEXT  
Page 106

Page 107

4.1 The Council’s employment policy framework is reviewed regularly to ensure it
remains up-to-date in terms of legislative requirements, good practice and
operational relevance.    
4.2 This year continued the previously agreed approach where policies are
reviewed initially through a desk-top exercise to establish the level of review
required: minimal for essential updates, mid-level for more in-depth
amendments or full where a change of approach is being considered.   
4.3 
4.4 
The policies referred to in this report have been reviewed as set out in
Appendix 1 which provides a summary of the changes.   
Based on the desk top reviews referred to above, work required on policies for
review was categorised as minimal for essential updates.  
4.5 
4.6
Policies scheduled for review in 2026 - 27
The number of policies being reviewed reflect current capacity. Policy reviews,
as referenced at Corporate Committee on 25 April 2023, have moved to a 5-
year rolling review programme which allows for the current employment
policies to be subject to a regular and timely review. However, it should be
noted that where impending legislation or operational demands require earlier
reviews, these will be scheduled accordingly to ensure compliance and
service delivery is maintained.   The transitional period to align all policies onto
the 5 year rolling programme is continuing with a prioritisation based approach
and plan in place to bring all employment policies in line with this review
framework.   
The approach to the employment policy framework is currently being
reviewed, the outcome of which will be brought to Corporate Committee in
August 2026. 
5. PROPOSALS  
5.1 
5.2 
Each year the Council’s employment policy framework is reviewed to ensure
that the policies remain up to date and relevant based on the priorities within
the Corporate Workforce Plan and the strategic direction of the Council.   The
policies referred to in this report ensure that the 2025 -26 review has been
undertaken in accordance with these priorities. 
It is proposed that the future approach to the employment policy framework is
considered, separating the strategic position from the more operational work
and that this approach is adopted for the 2026- 27 review and for future years.  
6. SUMMARY OF IMPLICATIONS  
6.1 The table below shows whether risks and implications apply if the
recommendations are agreed:
Page 107

Page 108

SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) x 
Policy and Legal x 
Financial x 
Risk x X
Staffing  X
Best Value and Transformation  X
Property  X
Information Communications Technology/Digital  XX
Equalities. Social Inclusion and Economic Impact  x 
Climate Change, Biodiversity and Sustainability  X 
6.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP)) 
Effective employment policies are essential to delivering effective services
and ensure compliance with legislation, best practice and council
requirements that support improvements through Best Value, and will better
enable the Council to fulfil the ambitions set out in it's strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the
following Council Plan strategic priorities:
☐ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report
support and contribute to improved outcomes for communities as
outlined in the following local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in  
Moray.
☒ Empowering and connecting communities.
☐ Improving wellbeing of our population 
6.3 Policy and Legal 
The Council is required to deliver legally compliant people policies that allow
the organisation to operate within the legal framework. 
6.4 Financial 
There are potentially minimal financial implications arising from the content
of this report arising from the addendum to the Special Leave Policy
depending on the number of employees that may be eligible for paid special
Page 108

Page 109

leave for disability reasons. It is anticipated that numbers will be low and may
not lead to annually recurring costs. 
6.5 Risk 
There are no risk implications arising from this report other than those set out
within the body of the report relating to the requirement to comply with
legislation. 
6.6 Staffing 
There are no staffing implications arising from this report. 
6.7 Best Value and Transformation 
There are no best value and transformation impacts arising from this report.  
6.8 Property 
There are no property implications arising from this report.  
6.9 Information Communications/Technology/Digital 
There are no implications arising from this report  
6.10 Equalities, Social Inclusion and Economic Impact 
Employment policies are written with due regard to equalities/socio economic
requirements and impact. The addition of Disability Leave provisions within
the Special Leave Policy is an example of a strengthened position in this
regard. 
6.11 Climate Change, Biodiversity and Sustainability Impacts 
There are no climate change or biodiversity impacts arising from this report.  
7. CONSULTATION  
7.1 This report has been prepared in consultation with the Head of People, Change
and Community Strategy, Service Manager Organisational Development and
Change and the Personnel Forum and views of managers have been
incorporated into the policy updates. The policies have been discussed and
developed with the Policy Forum with Trade Union representatives for Scottish
Joint Council, Craft Operatives and Teachers and any comments made have
been incorporated into the report. The report has also been presented to CLT
for their review and comment which have also been incorporated into the
report. 
8. BACKGROUND PAPER  
8.1 Appendix 1 – Policy Revisions 
Page 109

Page 110

APPENDIX 1 
Policy Name Description
Bullying and
Harassment Policy
The revisions introduce clear and comprehensive
information about what constitutes sexual harassment,
supported by practical examples. The policy
establishes evidence of a risk-assessed approach to
ensure compliance with preventative duties, defining
responsibilities for both prevention and intervention.
The policy includes reference to third-party
harassment.  There is an emphasis on reinforcing
organisational culture and leadership commitment to
tackling these issues. 
Code of Conduct Several minor updates have been made, including
revised job titles, clearer guidance regarding equal
opportunities and discrimination and updated
information about councillor’s conduct with employees
in line with www.gov.scot. Additional clarifications have
been provided on expectations for conduct between
council employees and the policy now includes
questions to help consider conflicts with outside
employment. The policy now references the Prevention
of Corruption Act in the Gifts and Hospitality section,
and expands on media contact procedures, highlighting
the role of the Communications team. A new equality
statement outlines the council’s commitment to
inclusion, while a reference to the Substance Abuse
Policy offers further clarity and directs employees to
relevant guidance. Finally, the protocol in Appendix A
has been updated.
Special Leave Policy 
(a) addition of
disability
leave 
A recent review of the Special Leave Policy proposes the
inclusion of Disability Leave, aligning the policy with
operational case management experience,
neighbouring local authorities and best practice.
Disability Leave is designed to support disabled
employees by offering authorised, planned or
unplanned time off for reasons related to their
disability—such as medical appointments, treatment,
Page 110

Page 111

or rehabilitation—without activating sickness absence
triggers. 
The policy update includes clear eligibility criteria,
guidance on application, and a recommended cap of
five paid days per year, with further adjustments
determined individually under the Equality Act 2010.
This change aims to proactively support employee
wellbeing, ensure compliance with legal standards, and
enhance operational planning while maintaining
accurate absence records.
(b) Allocation of
2 days
special leave
for
volunteers
added to the
Special
Leave Policy
Amendment arising from the consideration of the
approach to be taken to the establishment of support
centres in the event of the mobilisation of the provision
of such centre(s) to enable the council to fulfil its
Emergency Planning responsibilities under the Civil
Contingencies Act (2004).
The allocation of 2 days special leave to those who
volunteer to be part of an on call rota to incentivise
participation in the rota recompensing for the training
required and the disruption to domestic plans, being
available and prepared to assist as required. 
(c) Provision for
members of
voluntary
emergency
service
organisations
Special Leave to attend training to bring into line with
provisions for Armed Forces volunteers and to support
recruitment of volunteers to the SFRS in particular.
Whistleblowing
Policy
The Whistleblowing Policy review has incorporated
officer feedback and legislative changes. Key updates
include recognising sexual harassment as a protected
disclosure under the Employment Rights Act 2025,
clarifying the role of the Chief Governance
Officer/Monitoring Officer regarding public interest, and
updating responsibilities. Witness involvement in
investigations clarified, with guidance emphasising
selective interviewing based on relevance and
reasonableness, while balancing privacy concerns.
Clarity for Whistleblowers in receiving confirmation
Page 111

Page 112

correspondence outlining the investigation process,
their rights, and next steps if dissatisfied. The policy 
also features updated language and references
reflecting organisational changes, improved guidance
and training for staff and managers.
Recruitment and
Selection Policy 
The recruitment and selection policy has undergone
several revisions to enhance clarity, accessibility, and
compliance with current organisational standards.
These changes include the introduction of version
control and updated branding to ensure alignment with
other current policies.
The Council’s commitment statement has been
expanded to make more robust.  Legislative updates
have been captured with regards to PVG (Disclosure
Scotland) changes and a section added on the Right to
Work in the UK. 
New additions include referencing the Succession
Planning approach and Apprentices/ Trainees positions.
Headers have been introduced for Data Protection,
Security and Retention of Information, and Training,
highlighting the increased focus on safeguarding
information and staff development.
This provides a firm foundation for development of the
Council’s Recruitment and Retention Strategy.
Equality, Diversity
and Inclusion Policy
The Equality and Diversity policy has several updates: 
The title will now include 'Inclusion', aligning with best
practice. The scope of the policy will be clarified to
ensure it covers apprentices, interns, and similar roles.
Guidance will be expanded to address discrimination
based on non-job-related factors such as trade union
membership, agency worker status.  The policy will
introduce version control, and update branding and
format, including a content page and hyperlinks. There
will be a clarification of employee liability regarding
unlawful discrimination, emphasising that bullying and
harassment can also constitute unlawful
discrimination. Finally, gender-neutral language will be
adopted throughout the policy.
Page 112

Page 113

Page 113

Page 114

Page 114

Page 115

Report to: Corporate Committee Meeting Date: 26 May 2026  
Report by: Executive Director Finance, Strategy and Transformation    
Author: Jon Matthews/Audrey
Michie/Chris
Leonard/Jamie Fraser 
Contact
Email:
jon.matthews@moray.gov.uk
audrey.michie@moray.gov.uk
chris.leonard@moray.gov.uk
jamie.fraser@moray.gov.uk 
Subject: 2025-28 People, Change and Community Strategy, Customer Experience,
ICT and Digital and Finance Service Plans (Year 2 refresh) 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  To invite the Committee to consider the People, Change and Community Strategy,
Customer Experience, ICT and Digital and Finance Service Plans (Year 2 refresh).  
1.2  This report is submitted to Committee in terms of Section III (A) (4) of the Council’s
Scheme of Administration relating to monitoring performance of the services within the
Committee’s remit in accordance with the Council’s Performance Management
Framework.  
2.  SUMMARY  
2.1  Service Plans (Year 2 refresh) have been prepared identifying the improvement targets for
the remaining term of the plans.  In preparing the plans, managers have taken account of
risk, performance data, the LOIP, the Corporate Plan and other relevant factors such as
audit and inspections outcomes.  The Service Plans also identify the resources allocated
to each service.  
3.  RECOMMENDATIONS  
3.1  It is recommended that Committee:   
i)  consider and approve the Service Plan (Year 2 refresh) for People, Change
and Community Strategy in Appendix 1; 
ii)  consider and approve the Service Plan for Customer Experience, ICT and
Digital (Year 2 refresh) in Appendix 2; 
Item 12.
Page 115

Page 116

iii)  consider and approve the Service Plan for Finance (Year 2 refresh) in
Appendix 3.   
Jon Matthews
Executive Director Finance, Strategy and Transformation 
4.  BACKGROUND AND CONTEXT  
4.1  Service planning is a key aspect of the Council’s Performance Management Framework
that sets out the strategic direction for services.   
4.2  It should be noted that actions from the refreshed Best Value Action Plan, approved by the
Corporate Committee on 26 August 2026 (para 8 of the minute refers) will be monitored
and reported out with the Service Plan process.  
4.3  The service planning process focuses on forward planning for medium-term activities
supporting delivery of the Local Outcomes Improvement Plan (LOIP) and Corporate Plan. 
The Council’s planning process also includes team plans that focus on short term tactical
and operational activities supporting delivery of the Service Plan and strategies and
Employee Review and Development Plans (ERDP) and Professional Review and
Development (PRD) plans provide individual planning for employees’ activities and
development.  
4.4  As well as identifying service developments and improvements, the Service Plan
Framework requires an assessment of the output and outcome requirements for services
based on the Council’s priorities, statutory and regulatory requirements and other relevant
local and national direction and makes use of improvement tools for planning and
continuous improvement.  Services support their improvement work with the Public
Sector Improvement Framework (PSIF), or by using another recognised self-evaluation
tool.  Across services, priority outcomes are those included in the Council’s Corporate
Plan 2024-29 that directly relate to the service or are influenced by the service and should
be clearly identified. 
4.5  Setting clear measurable outcomes and defining key indicators by which progress will be
assessed continues to be an area for development within the Council.  However, it is
recognised that for some actions it can be difficult to identify a measurable outcome (e.g.
a change in legislation that must be implemented or updating a policy framework).
Therefore, as far as possible efforts have been made to set measurable outcomes for
service plan actions but in some cases outputs and key progress milestones have been
used so that it is still possible to measure whether the action has been progressed as
intended. 
4.6  A summary of progress is given below for each of the services based on the performance
monitoring carried out throughout the year and reported to committee as part of
performance reporting.  Further information on performance at the end of Quarter 4 is
included in the service Performance Reports that are also on the agenda of this
Committee.  The Performance reports note where there is a carry forward of actions from
the previous Service Plans. 
4.7  It should be noted that while there has been some re-organisation of teams and alignment
of services following the management restructure, service plans have been prepared
Page 116

Page 117

taking account of Council priorities, national priorities and ongoing and emerging service
priorities.  Therefore, it remains appropriate to seek approval for the year 2 refresh of
Service Plans to ensure that they continue to reflect the next iteration of priorities and
direction from committee and that services are appropriately directed and tasked. 
5.  PROPOSALS  
5.1  As the service has set high level priorities for a three-year period 2025-28, performance is
reported against that period, with actions and indicators being reviewed annually.     
Planned focus in new plans for Finance, Strategy & Transformation 
5.2  The revised Council structure has given the opportunity to consider how best to integrate
services corporately and connect service plan activity to gain greater impact from co-
ordinated, cross service effort directed towards the delivery of the Council’s corporate
plan priorities.  As a result, the corporate priority of tackling poverty and inequality has
been identified to provide a common focus across several service plans.  More
specifically, to advance this, services plan will: use whole systems approaches to ensure
there is joined up activity across services and partners; consider how data can be used to
give greater insight to enable targeting and early intervention; and take forward the use of
locality and placed based approaches to drive improved results.   
People, Change and Community Strategy 
5.4 Progress on planned work (success)
• The new digital engagement platform ‘Moray Engage’ is fully operational and being well
used by Council services.
• The continuous Improvement framework has been re-established, and a Public Service
Improvement Framework (PSIF) programme is in place, with a cycle of assessments
embedded. An Interchange PSIF page has been created along with a dedicated Engage
page to provide guidance to services undertaking self-assessment.
• Human Resources, Organisational Development and ICT services undertook in the
pilot PSIF assessment. Priorities were agreed with a draft implementation plan in place.
Implementation of the plan is ongoing.
• A revised Succession Planning approach to recruitment and retention was approved at
the Corporate Committee in June 2025.
• The communication and engagement programme has been revised, approved by the
Corporate Leadership Team (CLT) and embedded into practice. A review of engagement
activity is underway which will provide evidence for the development of a new
Consultation and Engagement strategy.
• The Local Outcomes Improvement Plan (LOIP) delivery framework was agreed by the
board and first report presented to the board in November 2025.
• Pentana (Performance management software) was redesigned using ‘user friendly’
portals to present service and corporate plans in an easy-to-follow format.
• Engagement using surveys has fully transitioned from ‘Survey Monkey’ to ‘Moray
Engage’.
• The complaints system has been amended to embed Child friendly complaints (CFC)
into the process.
• The Performance Management Framework was review and approved at the corporate
committee in February 2026.
Page 117

Page 118

• Work has completed to improve and develop knowledge to promote skills transfer
across teams. Succession Planning measures are in place across the teams along with
support and development plans.   
5.5 Progress on planned work (areas for development / not delivered)
• The support for New Elgin and Buckie areas through Locality Planning fell slightly short
of completion with recognition that further support is needed. Outstanding work will
continue in 2026/27.Although well progressed, the further development of community
engagement remains in progress. Timescales to complete the Learning Estate
consultation were ambitious given the scale of work involved. The remainder of work on
the project will be carried forward into 2026/27.
• Phase 2 to establish a leadership development programme to address corporate and
individual needs within the corporate management restructure remains outstanding. A
proposal is being developed to support the delivery of the phase 2. Work to continue in
2026/27.
• Progress to develop and implement a recruitment approach that addresses service
requirements and promote employment opportunities within the council has been
stifled by the challenges in recruiting to ‘hard to fill posts and key posts with Human
Resources (HR) and Operational Development (OD). Work to continue in 2026/27.
• Achieving all objectives to have recognised fair and competitive pay and conditions in
place proved challenging in the nine months’ timescale, with staffing and recruitment
being a contributory factor. Work to continue in 2026/27.
• Actions to address issues arising from the employee survey and workforce planning
have been developed but implementation remains ongoing. Remaining activity will
focus on completing service engagement, maintaining momentum on delivery, and
embedding ongoing monitoring through the performance management framework.
Work to continue in 2026/27.
• There is recognition that targeted youth work sessions to address health and wellbeing
issues and Employability requires more time to achieve agreed outcomes. Youth Work
staff have trained in Health Issues in The Community programme and are focussing on
rolling out the programme in schools. Work to continue in 2026/27.
• The ambitious one-year timescale to develop and implement initiatives creating a
culture where employees feel empowered, prepared and enabled to embrace change
proved challenging. Progress slowed due to the impact of senior recruitment priorities.
Work will continue into 2026/27.
• Progress of work to support of workforce related actions identified within the Best
Value Action Plan was limited during 2025/26. Resource pressures associated with
senior recruitment priorities impacted the progress in advancing real-time workforce
data. Outstanding work will be carried forward into 2026/27.
• The revision and implementation of absence management procedures, although well
progressed did not meet all objectives. Absence rates continue to rise amongst both
teaching and non-teaching staff.
• Work to review measures to reduce absence and provide support to reduce violence
and aggression in schools was unable to meet all set objectives. Violence and
aggression incidents in schools continue to remain high. 
5.6 Planned focus in new plan (reflecting above and challenges to come)
Page 118

Page 119

• Further build on work to strengthen community engagement and decision making
within identified areas, with a focus to develop and support community resilience and
promote inclusivity. 
• Develop an adult learning signposting landing page promoting easier access of learning
opportunities for adult learners.
• Revise and develop the workforce strategy to reflect organisational requirements and
develop the workforce.
• Continue to build targeted Youthwork, supporting young people transitioning from
secondary school to positive destinations.
• Further development of Pentana (Performance monitoring system) providing additional
service monitoring availability. 
5.7 The service plan for People, Change & Community Strategy is attached in Appendix 1. 
Customer Experience, ICT and Digital 
5.8 Progress on planned work (success)
• Delivered continued momentum on the Council’s digital transformation programme,
with tangible progress on high profile priorities including the corporate website rebuild,
SharePoint Online EDRMS migration and wider adoption of Microsoft 365 tools.
• Strengthened digital accessibility and user experience, embedding user centred design
and accessibility standards across new and redesigned digital services, particularly in
relation to the CRM project.
• Enhanced cyber resilience and assurance, progressing delivery of the Cyber Resilience
Plan alongside phishing simulations, security testing and alignment with national
standards and certifications.
• Advanced customer service modernisation, with substantive groundwork completed
for CRM replacement, improved self-service and stronger engagement between
Customer Services and operational teams. 
5.9 Progress on planned work (areas for development / not delivered)
• Delivery timescales for some large scale, complex programmes (notably elements of
the corporate data agenda) have extended into 2026/27, reflecting scale, technical
complexity and wider organisational dependencies.
• Customer insight and benchmarking activity remains at an early stage, with baseline
measures still being established ahead of more routine reporting.
• Progress on certain initiatives has been affected by external and national
dependencies, including supplier timetables, legacy system constraints and nationally
led connectivity programmes.
• Ongoing capacity pressures across ICT and Digital Services continue to require
prioritisation between transformation delivery and critical business as usual support. 
5.10 Planned focus in new plan (reflecting above and challenges to come)
• Complete delivery of major digital platforms, including the new corporate website,
intranet rebuild, CRM implementation and continued migration away from legacy
systems.
• Embed a Council wide customer strategy, setting clear service standards, improving
consistency across channels and strengthening the use of customer insight to drive
improvement.
Page 119

Page 120

• Progress a corporate data strategy, strengthening data governance, analytics capability
and use of insight to support transformation and decision making.
• Further enhance cyber resilience, infrastructure sustainability and business continuity,
including continued reduction of the on-premise estate and compliance with national
security and telephony requirements.
• Maintain a strong focus on accessibility, inclusion and usability, ensuring digital
services deliver measurable improvements for residents, staff and elected members. 
5.11 The service plan for Customer Experience, ICT and Digital is attached in Appendix 2. 
Finance 
5.12 Progress on planned work (success)
•  Financial planning has improved with revised methodology in place to ensure a more
accurate revenue budget with closer estimate and actual outturns 
• Final audited accounts confirmed full compliance with the requirements of the
accounting standard IFRS 16 Leases.
• All recommendations from the 2024/25 Annual Audit Report have been addressed and
closed by Auditors including a review of journals processes and introduction of
authorisation, streamlining reconciliation of Property, Plant and Equipment to the Fixed
Asset Register, fixed asset verification incorporated into business-as-usual work and a
review of assets under construction with no issues identified. 
5.13 Progress on planned work (areas for development / not delivered)
• Due to staff leave, progress is yet to be made with the implementation of the annual
Procurement Action Plan.  
• Staff absence, vacancies and other priorities affected delivery of the Financial Services
actions within the Corporate Asset Management Plan.  
•  Similar issues affected work relating to streamlining council tax processes and
introducing e-billing for non-domestic rates although initial discussions have taken
place.   
5.14 Planned focus in new plan (reflecting above and challenges to come)
• Strengthen capital monitoring with the introduction of automated monthly monitoring
reports. 
• Progress service efficiency work for both Taxation and Accounts. 
• Implement the Procurement Action Plan and recommendations from the latest Annual
Audit Report.
• Work with ICT to deliver agreed milestones of the Financial Management System
replacement project. 
• Explore options to introduce a empty homes levy and/or a second home premium in
relation to Council tax. 
5.15 The service plan for Finance is attached in Appendix 3. 
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
Page 120

Page 121

SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) ✓ 
Policy and Legal  ✓
Financial  ✓
Risk ✓ 
Staffing  ✓
Best Value and Transformation  ✓
Property  ✓
Information Communications Technology/Digital            ✓
Equalities. Social Inclusion and Economic Impact   ✓
Climate Change and Biodiversity Impact  ✓ 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population 
6.3  Policy and Legal 
None arising from this report.  
6.4  Financial 
None arising from this report. 
6.5  Risk 
There are potential risks around progress in all priority areas due to staffing pressures and
which often has an impact on officers.  
6.6  Staffing 
There are no staffing issues.  The service plan actions will be accommodated within
existing resources. 
The services have undertaken workforce planning to consider how best to prepare and
manage the workforce for the services to be able to respond to the agreed Council
priorities in the Corporate Plan and the service work that is required to support and
achieve those objectives.  Consideration has also been given to the Council Workforce
Page 121

Page 122

Strategy and Plan priorities in a service context.  The main themes arising from these
include: 
• Building capacity and resilience 
• Change management and a workforce culture to support and enable change.
• Health and Well-being management (including absence management).
• Recruitment and retention. 
6.7  Best Value and Transformation 
The service plans support the council to continue its Best Value journey.  
6.8  Property 
None arising from this report.  
6.9  Information Communications/Technology/Digital 
None arising from this report.  However, where relevant work is set out within the
workforce plans to ensure that the workforce is ready and enabled for change, including
digital skills.  
6.10  Equalities, Social Inclusion and Economic Impact 
None arising from this report.  
6.11  Climate Change and Biodiversity Impacts 
None arising from this report. 
Service contributions to the delivery of the Climate Change Strategy, Biodiversity Strategy,
Net Zero Fleet Strategy, Travel Strategy etc. are captured in the respective annual reports. 
The Corporate Plan recognises that sustainability, environmental, climate change and
biodiversity considerations are incorporated within existing projects and are specifically
considered as part of committee reporting processes.  In a service context, consideration
is also given to Climate Change and Biodiversity under the following main themes with
activities and good practice gathered half yearly within routine performance reporting
processes - 
• Contributing to the reduction of greenhouse gas emissions through reducing energy
use, recycling, planning in a way to allow use of public transport, local procurement
etc.
• Adapting to the effects of a changing climate by integrating changing climate into future
plans and existing projects, tracking weather impacts on services, supporting partners,
customers, and the public to adapt through promoting resilience
• Acting in a sustainable manner by enhancing owned greenspaces, planning in a way
that also benefits nature, ensuring staff have the skills and knowledge to protect and
restore biodiversity, help communities and clients connect with nature 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with the service managers in Customer
Experience, ICT and Digital, People, Change & Community Strategy and Finance and any
comments made have been incorporated into the report.  
Page 122

Page 123

8.  BACKGROUND PAPERS  
8.1  Nil.   
Page 123

Page 124

APPENDIX 1
PEOPLE, CHANGE & COMMUNITY STRATEGY - SERVICE PLAN 2025-28 (Year 2 refresh) 
1. Service
Definition: 
COMMUNITY STRATEGY The Community Strategy team delivers Moray Council’s Community Learning and Development functions, which
includes the Community Support Unit, Youth Work, and Adult and Family Learning. The service also provides support to Community Councils
and leads on community engagement. In addition, Community Strategy oversees all corporate and internal communications, and has
responsibility for the Council’s overarching strategic direction, performance management, and continuous improvement.
PEOPLE & CHANGE 
People Management and Payroll 
The People Management Service delivers professional HR advisory and administrative support alongside a full in-house payroll function. The
team works in partnership with managers and TUS colleagues to ensure effective workforce management, compliance with employment
legislation and national agreements, and the accurate, timely payment of salaries - supporting strong governance and the consistent delivery
of Council services
Organisational Development and Health and Safety
The Organisational Development and Change service provides professional expertise to develop workforce capability, strengthen
organisational culture and enable effective sustainable change aligned with Council priorities. The Service works collaboratively with
managers across leadership and talent, workforce   engagement and culture, workforce planning and policy, health, safety and wellbeing,
strategic change, and workforce development. Through this work the service enables the Council to have the capacity, capability and culture
to deliver high quality services to communities.
2. Service
Resources:
FTE: 157.41 FTE
Revenue Budget: £13,278,377 
3. What have we identified for improvement in 2025-28 What evidence did we use to identify this improvement? 
Please add benchmark information wherever available and relevant to the
improvement.
Communities and Place – supporting our communities to build
capacity and influence decision-making that impacts on them and
their local area.
Local Outcome Improvement Plan (LOIP)
Corporate Plan
Moray Partnership CLD Plan
Ongoing engagement with our communities
People and Change:
• Leadership Capacity and Development
• Workforce Planning and Change
• Organisational Development
• Recruitment and Retention
• Health and Well-being
• Gender Pay Gap
Workforce and OD Strategy 2024-27
BV Consolidated Action Plan 2025
Employee Survey 2025
Management of workforce implications linked to budget savings
HR metrics
Feedback from Trades Union Representatives and Managers
Health & Safety Annual Report 2025
Corporate Plan 2024-29
Page 124

Page 125

APPENDIX 1
PEOPLE, CHANGE & COMMUNITY STRATEGY - SERVICE PLAN 2025-28 (Year 2 refresh) 
Local Government Benchmarking Framework (LGBF) 
4. Local
Outcomes
Improvement
Plan (LOIP) /
Corporate
Plan (CP)
Outcome or
Priority
Action  Planned Outcome Outcome measures Completion
target
Lead Priority
Rating
(1 high 3
low)
(L) Empowering &
connecting
communities.
(CP) Building
Thriving, Resilient,
Empowered
Communities
1. Take a partnership
approach to locality
planning in priority
areas of Moray to
enable people to
influence services
and develop
community action
through support of
locality planning
process in New Elgin
and Buckie 
1.1 Locality Planning
process supported in
New Elgin and Buckie
through work of
community led action
groups developing and
delivering projects.
1.2 Further development
of community
engagement with the
Develop stronger,
more resilient,
supportive,
influential and
inclusive
communities (L) 
More communities
and individuals are
more involved in
local decision
making and in
helping to plan and
deliver of local
services (CP) 
Improvements in
specific location
measures in locality
plans 
Consideration being
given to case study-
based reporting to
evidence delivery for
locality plans 
PIs
• ERC003 Number of
new Community
action plans in
place
• ERC004 Number of
Support
Agreements linked
to community
assets.
• ERC036 % of
Support
1. 31 March
2027 
1.1 31 Dec
2026 
1.2 31 March
2027 
Service
Manager –
Community
Strategy &
Engagement
1
Page 125

Page 126

APPENDIX 1
PEOPLE, CHANGE & COMMUNITY STRATEGY - SERVICE PLAN 2025-28 (Year 2 refresh) 
public on the future of
council services.
1.3 Support the
engagement and
consultation work on
service specifics as
they emerge (e.g.
Libraries and Leisure)
(BV1.2)
1.4 Work with community
planning partners to
develop shared
engagement (BV1.2)
1.5 Explore with partners
establishing
community
survey/panel (BV1.2) 
Agreements
meeting at least
one objective.
• ERC008 % increase
in number of local
residents engaged
in locality planning
process (NE &
Buckie)
• ERC001 % of local
people who agree
with the statement
‘I can influence
decisions affecting
my local area’. 
1.3 Ongoing 
1.4 Ongoing 
1.5 30 Dec
2026 
(L) Empowering &
connecting
communities.
(CP) Building
Thriving, Resilient,
Empowered
Communities
2. Develop stronger,
more resilient,
supportive,
influential and
inclusive
communities
2.1 Extend approaches to          
promote easier access 
to adult learning in 
Moray
Confident, skilled
and self-reliant
communities where
expectations and
aspirations are
raised and achieved
• Adult Learner
Signposting landing
page developed
• Increase and
sustain number of
adult learning
opportunities
posted on ALIS
system
• Increase in people
accessing
community-based
adult learning
opportunities
delivered
March 2027 /
ongoing
Head of
People,
Change &
Community
Strategy
1
Page 126

Page 127

APPENDIX 1
PEOPLE, CHANGE & COMMUNITY STRATEGY - SERVICE PLAN 2025-28 (Year 2 refresh) 
• Case
studies/qualitative
reports on activities
and impacts shared
(CP) Strategic
Framework:
Financial,
Workforce, Digital,
Transformation
Strategies. 
Performance
Management
Framework 
3. Develop and
maintain a skilled,
motivated and
flexible workforce
and adapt to deliver
sustainable services
through –
• Developing
Leadership
Capacity
• Workforce
Planning and
Change
• Workforce and
Organisational
Development
• Recruitment and
Retention
• Health and
Wellbeing 
2.1 Establish Leadership
Development
programme to address
corporate and
individual needs
aligned to the qualities
and leadership skills
as set out in the
Provide clear
leadership, direction
and model
behaviours to foster:
• A positive and
respectful
workplace.
• Maximise
capacity and
performance.
• Enhance
employee
experience and
wellbeing by
continually
improving our
culture and
engagement.
2.1
• Revised longer term
strategy and plan
developed to meet
organisational
requirements.
• Interim phase 1
completed.
• Range of leadership
development
activity in place
across
management tiers.
• Leaders developed
to lead challenging
agenda with
feedback on
positive impact
made, measured by
skills analysis
surveys at key
points.
• Number of 1/2/3
tier managers
trained and
showing
improvements in
awareness of key
learning points
2. Dec 2026 
2.1 Dec 2026 
Service
Managers –
People
Management &
Organisational
Development &
Change (2.1,
2.4 & 2.5) 
Service
Manager –
People
Management
(2.2 & 2.3) 
1
Page 127

Page 128

APPENDIX 1
PEOPLE, CHANGE & COMMUNITY STRATEGY - SERVICE PLAN 2025-28 (Year 2 refresh) 
corporate
management
restructure.
2.2 Develop and
implement a
recruitment approach
that addresses service
requirements.
Promote employment
opportunities and
raise the profile of
Moray Council as an
employer.
2.3 Have in place fair and
competitive pay and
conditions that are
recognised and free of
bias.
2.4 Develop an approach
that modernises the
conditions of service
and contributes to the
financial sustainability
of the Council.
2.5 Have in place actions
to address issues
arising from the
employee survey and
workforce planning
themes
2.6 Ensure key projects
are resourced,
planned and delivered
(measured through
skills analysis
survey). 
• Employee survey
question(s) on
management
impact to provide
baseline and show
improvement over
time.
2.2
• Increased number
of candidates
meeting criteria for
council vacancies
in hard to fill posts
(specifics to be
developed further
as per service
requirements)
• Attrition rates
improved (lowered)
for areas with high
turnover (to be
developed further
as per service
requirements).
• Reduced number of
repeat adverts and
reduction in time
taken from advert
to first day of
employment. 
2.2 Dec 2026 
2.3 Dec 2026 
2.4 Dec 2026 
2.5 Dec 2026 
2.6 Oct 2026
Page 128

Page 129

APPENDIX 1
PEOPLE, CHANGE & COMMUNITY STRATEGY - SERVICE PLAN 2025-28 (Year 2 refresh) 
within agreed
timescales and budget
(Service Level Priority
in 2025/26)
• Feedback of
positive impact
from managers
through personnel
forum.
• Baseline for
number of career
progression
opportunities
established.
2.3
• Assessment
against Scottish
Government’s
Minority Ethnic
recruitment toolkit
with improvement
actions identified
• Improvement in
ranking for LGBF
indicators relating
to Gender Pay Gap
& % of highest paid
5% who are
women.
• Increased number
of applications and
subsequent
appointments from
ethnic minority
groups.
2.4
Page 129

Page 130

APPENDIX 1
PEOPLE, CHANGE & COMMUNITY STRATEGY - SERVICE PLAN 2025-28 (Year 2 refresh) 
• Option
development for
Working week  e.g
reducing working
hours, and
subsequent action
plan for preferred
option selection
• Working practices
reviewed and levels
of enhanced rates
payable reduced
• Terms and
conditions revised
2.5
• Employee Survey
action plan
developed and
agreed at
Committee
• Services progress
improvements as
per action plan
• Service level
actions arising from
workforce planning
are progressed
within services and
monitored through
the regular
performance
management
framework
Page 130

Page 131

APPENDIX 1
PEOPLE, CHANGE & COMMUNITY STRATEGY - SERVICE PLAN 2025-28 (Year 2 refresh) 
2.6
• Projects are
resourced
sufficiently to allow
timely completion
of aims and
objectives
• Projects completed
on time and
achieved objectives
• Workload on
project and core
staff is managed
and manageable 
PIs
• CORP3b - % of
highest paid 5%
employees who are
women.
• CORP3c – The
gender pay gap (5) 
5. Service
Level
Outcomes or
Priorities
Action Planned Outcome Outcome Measures Completion
Target
Lead Priority
rating
(1 high 3
low)
Youth Work  4. YW deliver targeted
work in each
secondary supporting
Working together to
make the biggest
difference to the
PIs
• ERC023 Increase the
% of youth
3. 31 March
2027 
Service
Manager –
Community
2
Page 131

Page 132

APPENDIX 1
PEOPLE, CHANGE & COMMUNITY STRATEGY - SERVICE PLAN 2025-28 (Year 2 refresh) 
5. Service
Level
Outcomes or
Priorities
Action Planned Outcome Outcome Measures Completion
Target
Lead Priority
rating
(1 high 3
low)
employability skills
and a positive
transition from
secondary school into
college, work or
training for identified
young people. 
3.1 Youth Work staff
deliver targeted
sessions in partnership
with school to address
health and wellbeing
issues and/or
Employability activities
in S3.
3.2 Outreach youth
workers are employed
in Buckie, Forres, Keith
and Elgin to pilot work
in school and in the
community with young
people who are not
fully engaged in
learning. 
outcomes for people
in Moray. 
Young people are
more ready to enter
employment, training
or college. 
Young people
participate in informal
learning programmes
they have co-designed
and as a result have
increased attendance
at school.
engagement and
participation.
• ERC023a Number of
young people
engaged in Youth
Work activities. 
Strategy &
Engagement
Recruitment
and Retention
4  Develop a succession
planning approach
that builds internal
Internal capacity is
increased with internal
candidates enabled to
Measures for number of
internal applicants
developed:
March 2028 Service
Manager –
Organisational
2
Page 132

Page 133

APPENDIX 1
PEOPLE, CHANGE & COMMUNITY STRATEGY - SERVICE PLAN 2025-28 (Year 2 refresh) 
5. Service
Level
Outcomes or
Priorities
Action Planned Outcome Outcome Measures Completion
Target
Lead Priority
rating
(1 high 3
low)
capacity and
contributes to a
positive culture
4.1 Develop approach to
build succession
planning
4.2 Monitor the application
of the Council’s agreed
succession planning
approach that builds
internal capacity and
contributes to a
positive culture
prepare for alternative
and promoted
positions.
Year 1 –
measure/baseline
established (Complete)
Year 2 – 5% increase in
volume of internal
applicants
Year 3 – 2.5% increase
5% increase in number
of career progression
opportunities
Development
& Change
Organisational
Development
5  Develop and
implement initiatives
to create a culture
where employees are
prepared for change. 
Encourage flexibility
and adaptability to
support employees to
adapt to new ways of
working including
embedding digital
skills and
competence to
improve efficiency
and levels of service. 
Employees are
empowered, prepared
and enabled to
embrace change.
Employee survey
questions establish
baseline for monitoring
improvement on:
• Impact of training
and development to
support new ways of
working
• Levels of confidence
in being supported to
be flexible and
adaptable
• Levels of confidence
in improved
efficiency and levels
March 2028 Service
Manager –
Organisational
Development
& Change
1
Page 133

Page 134

APPENDIX 1
PEOPLE, CHANGE & COMMUNITY STRATEGY - SERVICE PLAN 2025-28 (Year 2 refresh) 
5. Service
Level
Outcomes or
Priorities
Action Planned Outcome Outcome Measures Completion
Target
Lead Priority
rating
(1 high 3
low)
of service achieved
as a result of change
• Positive feedback
from change
exercises  
Best Value
Actions
6  Implement workforce
related actions
contained within the
Best Value Plan in
accordance with
agreed timescales
Effective distributive
leadership and
collaborative working.
Organisational
capacity to deliver
services,
communication that
promotes an
improvement focused
culture and effective
arrangements to
support
transformation.
Improved use of data
including exploration
of use of real time data
where possible
Milestones: 
• Employee survey
responses show
greater than 20%
improvement in
leadership questions
• Culture of
cooperation and
partnership
evidenced in
leadership survey
results
• Real time data
researched and
assessed with
timescale for
implementation if
viable
Dec 2026 Service
Managers –
People
Management &
Organisational
Development
& Change 
1
Continuous
Improvement
– Strategy &
Performance
7  Guide relevant
services to complete
assessments by
March 2026.
Cycle is embedded.  March 2027 Strategy and
Performance
Manager
2
Page 134

Page 135

APPENDIX 1
PEOPLE, CHANGE & COMMUNITY STRATEGY - SERVICE PLAN 2025-28 (Year 2 refresh) 
5. Service
Level
Outcomes or
Priorities
Action Planned Outcome Outcome Measures Completion
Target
Lead Priority
rating
(1 high 3
low)
Performance
Management
8  Further development
of Ideagen for
performance
reporting
Creation of
dashboards for
reporting
Agree format and
reporting of dashboards
31 March 2027 3
9 Provide information
and research support
in the development of
the LOIP 2027
Council meets data
and analysis
requirement in its
contribution to the
revision of LOIP
priorities
Actions and outcome
measures in place for
LOIP 2027
March 2027 1
Health &
Wellbeing 
10 Ensure the Health and
Work Policy and
Procedures providing
a supportive and
comprehensive
framework within
which to manage
health and wellbeing
and any absence that
occurs are applied by
managers
Improve attendance at
work and manage
sickness absence
through additional
targeted support to
assist in maximising
attendance thus
reducing costs and
improve practice and
adherence to policy.
PIs
• CORP6a Sickness
absence days per
teacher reduced by
0.5 days per fte
(Reduce by 0.5 days)
• CORP6b Sickness
absence days
nonteacher reduced
by 0.5 days per fte
(Reduce by 0.5 days)
• Sickness absence
days lost (Service)
(Non-Teacher)
• % of Sickness
(Service) (Non-
Teacher)
31 March 2027
(Ongoing
Annually)
Service
manager –
People
Management
2
Page 135

Page 136

APPENDIX 1
PEOPLE, CHANGE & COMMUNITY STRATEGY - SERVICE PLAN 2025-28 (Year 2 refresh) 
5. Service
Level
Outcomes or
Priorities
Action Planned Outcome Outcome Measures Completion
Target
Lead Priority
rating
(1 high 3
low)
11 Proactively support the
Health & Wellbeing of
employees; review
measures to reduce
sickness absence
including day one
notification; ensure
revised operational
procedures are applied
by managers; provide
support for reducing
incidents of V&A in
schools
Absence is managed
effectively and levels
are reduced efficiently
and timeously 
Measures are
deployed that support
school-based staff to
feel safe at work and
feel equipped to
manage challenging
behaviour
appropriately
• Review proactive
measures to reduce
sickness absence. 
Ensure revised absence
management procedures
are applied by managers. 
March
2027/Ongoing
Service
Managers –
People
Management &
Organisational
Development
& Change
2
Workforce
Culture for
Change
12 Develop workforce
culture to support and
enable change 
Employees are
involved in change
with opportunities to
support the design,
delivery and
implementation of
service-related
changes and
transformation
• feedback from teams
will be used to
assess the
effectiveness of
change management
through and the
successful
implementation of
service-related
changes
31 March 2027
(Ongoing)
Service
managers
1
Page 136

Page 137

APPENDIX 2
CUSTOMER EXPERIENCE, ICT & DIGITAL - SERVICE PLAN 2025-2028 (Year 2 refresh) 
1. Service
Definition: 
Customer Experience, ICT and Digital Services provides the strategic leadership, technology infrastructure, data capability, and
customer focused design that enable the Council to deliver modern, efficient and accessible services. The service brings together
customer contact, digital development, and ICT operations to support transformation across the organisation and improve outcomes
for our residents, communities and workforce. 
2. Service
Resources:
Service Resources: 87.16 FTE
Budget: Capital £526k
Budget: Revenue: £5,559k 
3. What have we identified for improvement in 2025-28? What evidence did we use to identify this improvement? 
Please add benchmark information wherever available and relevant to the
improvement.
Acceleration and Maximisation of Digital Tools  Digital Strategy 2025–2028
Workforce Digital Skills, Capability & Confidence  Digital Strategy 2025–2028 
Innovation & Future Readiness  Digital Strategy 2025–2028 
Business Intelligence and Insight  ICT Strategy 2025-2028 
Assurance (Security, Compliance & Resilience)  ICT Strategy 2025-2028 
Forward Planning  ICT Strategy 2025-2028 
Note: Progress against BV Actions will be monitored and reported out with Service Plan process 
Page 137

Page 138

APPENDIX 2
CUSTOMER EXPERIENCE, ICT & DIGITAL - SERVICE PLAN 2025-2028 (Year 2 refresh) 
4. Local
Outcomes
Improvement
Plan (LOIP) /
Corporate
Plan (CP)
Outcome or
Priority
Action  Planned Outcome Outcome measures Completion
target
Lead Priority Rating
(1 high, 3 low)
(CP) Strategic
Framework:
Financial,
Workforce, Digital,
Transformation
Strategies. 
Performance
Management
Framework
Acceleration and
maximisation of digital
tools
Expansion and enhancement
of digital technologies across
services to improve efficiency,
effectiveness and ways of
working. Reduced reliance on
legacy platforms.  Increase
usage of AI technologies such
as Copilot and Copilot Agents
in the organisation.
•Reduction in legacy
systems usage
• Adoption levels of
M365 apps (Forms,
Planner, OneNote etc.) 
Ongoing Service
Manager
Digital
Services
1
(CP) Strategic
Framework:
Financial,
Workforce, Digital,
Transformation
Strategies. 
Performance
Management
Framework
Increase use of LEAN
process reviews using
Engage Modeller
Service processes are
simplified and streamlined,
resulting in reduced waste
and faster end‑to‑end
delivery.
• Number of processes
reviewed using Engage 
Ongoing Service
Manager
Digital
Services
1
(CP) Strategic
Framework:
Financial,
Workforce, Digital,
Transformation
Strategies. 
Performance
Management
Framework
Migration of SharePoint
On‑Premise EDRMS to
SharePoint Online
Migration to a modern,
cloud‑based information
management environment
improving accessibility,
searchability and compliance.
• 100% of EDRMS
content migrated
• Number of services
actively using new SPO
EDRMS
• Reduction in
on‑premise storage for
EDRMS
June 2026 Service
Manager
Digital
Services
1
Page 138

Page 139

APPENDIX 2
CUSTOMER EXPERIENCE, ICT & DIGITAL - SERVICE PLAN 2025-2028 (Year 2 refresh) 
4. Local
Outcomes
Improvement
Plan (LOIP) /
Corporate
Plan (CP)
Outcome or
Priority
Action  Planned Outcome Outcome measures Completion
target
Lead Priority Rating
(1 high, 3 low)
(CP) Strategic
Framework:
Financial,
Workforce, Digital,
Transformation
Strategies. 
Performance
Management
Framework
Migration of documents
from Shared Drives to
M365 (SharePoint,
Teams, OneDrive)
Improved information
governance, reduced
duplication, better security
and shift to modern
collaborative working.
• GB/TB of data
migrated
• Number of  shared
drives
decommissioned
• Reduction in
on‑premise storage for
Shared Drives
March 2027 Service
Manager
Digital
Services 
1
(CP) Strategic
Framework:
Financial,
Workforce, Digital,
Transformation
Strategies. 
Performance
Management
Framework 
Website Rebuild
(Corporate Website) 
Delivery of a modern,
accessible, user‑centred
website built on a secure and
supported CMS platform.
Improved usability,
performance and navigation
to support residents,
businesses, partners and
staff. 
• WCAG 2.2
accessibility
compliance
• Shift to new website
platform
• Decommission of
legacy platform 
June 2026 Service
Manager
Digital
Services 
1
(CP) Strategic
Framework:
Financial,
Workforce, Digital,
Transformation
Strategies. 
Performance
Management
Framework 
Intranet Rebuild
(Corporate Intranet) 
Delivery of a modern,
accessible, user‑centred
intranet built on a secure and
supported CMS platform.
Improved internal
communication,
collaboration,
knowledge‑sharing and staff
• WCAG 2.2
accessibility
compliance
• Increased staff
engagement with
content and tools  
March 2027 Service
Manager
Digital
Services 
1
Page 139

Page 140

APPENDIX 2
CUSTOMER EXPERIENCE, ICT & DIGITAL - SERVICE PLAN 2025-2028 (Year 2 refresh) 
4. Local
Outcomes
Improvement
Plan (LOIP) /
Corporate
Plan (CP)
Outcome or
Priority
Action  Planned Outcome Outcome measures Completion
target
Lead Priority Rating
(1 high, 3 low)
self‑service across the
organisation. 
(CP) Strategic
Framework:
Financial,
Workforce, Digital,
Transformation
Strategies. 
Performance
Management
Framework
Develop a data approach
to enhance the value of
data to support key
corporate priorities 
Develop and implement a
corporate data strategy and
plan for big data that connects
data and develop analytics to
inform and drive service
efficiency. This data approach
will; - enhance the value of
data through robust, open and
transparent access that
supports key corporate 
priorities e.g. Transformation
through the use of data
analytics, Power BI etc. -
ensure data and information is
held, accessed and made
available to improve
understanding and inform
decisions in a safe and lawful
way.
Develop and
implement a corporate
a data strategy and plan
for big data to connect
data, develop analytics
to inform and drive
service efficiency
March 2027 Service
Manager
Digital
Services
1
Page 140

Page 141

APPENDIX 2
CUSTOMER EXPERIENCE, ICT & DIGITAL - SERVICE PLAN 2025-2028 (Year 2 refresh) 
5. Service
Level
Outcomes or
Priorities
Action Planned Outcome Outcome Measures Completion
Target
Lead Priority
rating
(1 high, 3
low)
Service
Development
(ICT)
Support services to fully
utilise systems and platforms
to enhance service delivery to
the public e.g. Gladstone in
Sport and Leisure, Spydus in
Libraries, Lagan (Customer
Services).
Service specific systems are
fully functional, and
downtime is minimised. 
Enhancements and
upgrades are supported.
Reduction in downtime.
Enhancements and
upgrades are completed
within prescribed
timescales per system.
March 2027 (or
per contractual
requirements)
Service
Manager
Digital
Services
1
Assurance (ICT) Cyber Resilience –
Implement enhanced
measures to manage cyber
security and resilience risks
Implementation of Cyber
Resilience Plan completed. 
Business Continuity Plans /
work for corporate and
service cyber resilience
completed.
Plan implemented for
enhanced risk-based
approach. 80% of online
workforce completed
eLearning modules
Improved self-
assessment tool ratings
including certifications
(e.g. PSN Accreditation,
Cyber Essentials/Plus)
Reduced number of high-
risk actions arising from
annual health IT health
check 
March 2027 Service
Manager ICT
1
Forward
Planning (ICT)
Identify, plan, schedule and
support large scale corporate
system replacements
Corporate system
replacements are replaced
efficiently and timeously in
accordance with agreed
council procedures
Systems replaced within
scheduled timeframes
Compliance with
procurement procedures
and due technical
diligence
March 2027 Service
Manager
Digital
Services
2
Health and
Wellbeing
(Staff)
Ensure the Health and Work
Policy and Procedures,
providing a supportive and
comprehensive framework
Improve attendance at work
and manage sickness
absence through additional
targeted support to assist in
PIs
•  Sickness absence days
lost (Service) (Non-
Teacher) 
March 2027
(Ongoing
Annually)
Service
Managers
2
Page 141

Page 142

APPENDIX 2
CUSTOMER EXPERIENCE, ICT & DIGITAL - SERVICE PLAN 2025-2028 (Year 2 refresh) 
within which to manage
health and wellbeing and any
absence that occurs, are
applied by managers.
maximising attendance thus
reducing costs and improve
practice and adherence to
policy.
•  % of Sickness (Service)
(Non-Teacher)
Customer
Services
Introduce new CRM solution Improve customer
experience, service
efficiencies, increased
customer self-service 
Outcome Measure -
More accessible and
efficient service to the
public 
No remaining forms on
legacy system 
Decommission of legacy
CRM System 
Milestones
Contract Finalisation
Training
Discovery Sessions
Implementation Build 
Go‑Live
Post‑Go‑Live
Enhancements 
March 2027 
Dec 2025
Feb 2026
March 2026
Nov 2026
Nov 2026 
March 2027
Service
Manager
Customer
Service and
Experience
2
Education Support and contribute to
development of Education
ICT Strategy 
Support and contribute to
the development of an 
Education ICT Strategy that
ensures readiness for future
digital development that
enhances learning and
teaching as well as the
possible impact of
developing technologies
such as AI. ICT infrastructure
has the technology and the
capacity required to support
Bandwidth increased
across school estate
(SWAN 2) Digital learning
devices and use of
technology increased 
Internet link from
Education Scotland
novated to the Council,
and bandwidth
increased. 
31 March 2026
(end of Capita
SWAN
contract) 
2029
(as part of
SWAN 2) 
30 April 2026 
Service
Manager ICT
1
Page 142

Page 143

APPENDIX 2
CUSTOMER EXPERIENCE, ICT & DIGITAL - SERVICE PLAN 2025-2028 (Year 2 refresh) 
future digital development
opportunities to facilitate 
enhanced digital learning
and teaching that suits 
long term educational
requirements. 
Refresh of Education ICT
Strategy 
October 2026 
ADD ANY NEW SERVICE LEVEL ACTIONS BELOW
5. Service
Level
Outcomes or
Priorities
Action Planned Outcome Outcome Measures Completion
Target
Lead Priority
rating
Customer
Services
Creation of a Customer Strategy Develop a Council-wide
customer strategy to be
adopted by all services, that
sets clear customer service
standards and expectations,
embeds the customer in
decision-making and
performance, and improves
how we understand and
respond to customer needs
across all services and
channels—shifting from
reactive delivery to proactive
improvement. 
• Committee approval of
new customer strategy 
December 2026 Service
Manager
Customer
Service and
Experience
1
Customer
Services
Investigate AI solutions
(Telephony / Chatbot)
AI and automation deployed
to improve customer
experience, reduce pressure
•  Investigation complete March 2027 Service
Manager
Customer
2
Page 143

Page 144

APPENDIX 2
CUSTOMER EXPERIENCE, ICT & DIGITAL - SERVICE PLAN 2025-2028 (Year 2 refresh) 
on staff, and provide faster,
more accurate resolutions.
Service and
Experience
Customer
Services
Internal service liaison and
improvement 
Enagement with all council
services currently supported
by Customers Services, to
review and quality-assure all
in-person and telephony
functions in addition to CRM
engagement, ensuring
appropriate customer
choice, with appropriately
accessible, intuitive and
well-provisioned  services
across all available
channels.
Record of quarterly regular
service liaison meetings,
with record of agreed
actions noted, subsequently
tracked and completed. 
March 2027
(recurring
annually)
Service
Manager
Customer
Service and
Experience
2
Customer
Services
Customer Survey /
Benchmarking
Establish a clear baseline of
customer experience and
sentiment to inform
improvements and measure
progress over time.
• Baseline customer
satisfaction score captured
• Year‑on‑year improvement
in satisfaction
• Benchmarking results
against comparable
councils or services
June 2026 Service
Manager
Customer
Service and
Experience
1
Customer
Services
New Telephony / Call Recording Replacement of legacy
telephony and call recording
systems with a modern,
cost‑effective platform that
improves reliability,
reporting and customer
experience.
• New system implemented
on schedule
• Reduction in telephony
outages / faults
• Improved call quality and
reporting capability
• Reduction in call
abandonment rates
March 2027 Service
Manager
Customer
Service and
Experience
2
Customer
Services 
Commercialising copy shop Investigate viability of
generating revenue by
providing print / copy shop
support to public/ third
sector partners.
• Completion of viability
assessment, ensuring full
cost recovery plus profit, at
commercially competitive
rates.
March 2027 Service
manager
Customer
Service and
Experience
2
Page 144

Page 145

APPENDIX 2
CUSTOMER EXPERIENCE, ICT & DIGITAL - SERVICE PLAN 2025-2028 (Year 2 refresh) 
• Successful trial of in-
sourced print requests via
external customer portal
• Go Live
Complaints
Handling
Refreshed Child Friendly
Complaints guidance and
training
Development and delivery of
improved CFP guidance and
training to Moray staff and
residents as applicable.
All Child Friendly
Complaints recorded and
reported as part of
complaints process.
• Development of refreshed
CFC guidance
• Promotion of this to staff
and external customers
• Training to be delivered to
staff via self –directed
learning and workshops
• % of CFCs being recorded
monitored and reported  
31 March 2027 Service
manager
Customer
Service and
Experience 
2
ICT BYOD (Bring Your Own Device) A secure, compliant BYOD
framework enabling flexible
working and reduced
hardware costs.
• BYOD policy approved and
implemented
• Number of staff
successfully onboarded
• Reduction in corporate
device procurement
March 2027 Service
Manager ICT
1
ICT Telephony Review Comprehensive review of all
telephony provisions to
identify rationalisation,
savings and modernisation
opportunities.
• Telephony footprint
reduced
• Savings realised
• Consolidation onto fewer,
modern platforms
March 2027  Service
Manager ICT
2
ICT Review/Refresh of ICT Provision
for Elected Members
Modern, secure and
user‑friendly digital
provision for Elected
Members to support
effective communication,
casework and governance.
• Updated devices / systems
deployed
• Improved satisfaction of
Elected Members
• Fewer support calls raised
by Members
Feb 2027 Service
Manager ICT
1
ICT Reduction of On‑Premise Server
Estate
Reduced dependency on
ageing on‑premise
infrastructure through
consolidation, migration to
cloud platforms, and
decommissioning of legacy
• Reduction in physical
servers
• Reduction in on‑premise
hosting/energy costs
• Number of applications
migrated to cloud/SaaS
March 2028 Service
Manager
ICT/Service
Manager
Digital
Services
1
Page 145

Page 146

APPENDIX 2
CUSTOMER EXPERIENCE, ICT & DIGITAL - SERVICE PLAN 2025-2028 (Year 2 refresh) 
systems. This improves
resilience, security, and
long‑term cost efficiency.
• Decommissioning
milestones achieved
• Reduction in data centre
incidents/outages
ICT Rollout of Windows 11  Modern, secure, and
supported desktop
operating environment rolled
out across the organisation,
ensuring compliance,
improved performance, and
compatibility with modern
applications. 
• Number of devices
upgraded to Windows 11
• Reduction in Windows 10
devices remaining in scope
• Reduction in security
vulnerabilities associated
with outdated OS
• Successful deployment of
required apps and
configurations
• Improved device
performance/boot times 
March 2027 Service
Manager ICT
1
ICT Public Switched Telephone
Network (PSTN) Switch-Off
Programme
Migration of legacy PSTN,
and Integrated Services
Digital Network Services
(ISDN) solutions to modern
digital All-IP based
solutions.  
• All legacy systems
migrated by national switch-
off deadline
• Reduction in telephony
costs 
January 2027 Service
Manager ICT
1
Page 146

Page 147

APPENDIX 3
FINANCE - SERVICE PLAN 2025-2028 (Year 2 refresh) 
1. Service
Definition: 
Finance provides support to services across the Council, to the Grampian Valuation Joint Board and, in partnership with NHS colleagues,
contributes to supporting the Moray Integration Joint Board.  Main functions include Financial Planning and Reporting, Treasury
Management, Investment, Accountancy, Banking and Insurance, Accounts Payable and receivable, Taxation (Council Tax and Non-
Domestic Rates billing and recovery) and Procurement.
2. Service
Resources:
FTE 60
Budget £2,828,379 
3. What have we identified for improvement in 2026-28? What evidence did we use to identify this improvement? Please add
benchmark information wherever available and relevant to the
improvement.
Ensure financial sustainability by strengthening the financial
management process:
- Strengthen capital monitoring
- Ensure capital budget set in advance is realistic   
Best Value Action Plan 2025-2026 
Replacement of financial management system Key corporate system and major project
Note: Progress against BV Actions will be monitored and reported out with Service Plan process  
Page 147

Page 148

APPENDIX 3
FINANCE - SERVICE PLAN 2025-2028 (Year 2 refresh) 
4. Local
Outcomes
Improvement
Framework
(LOIP) /
Corporate Plan
(CP) Outcome
or Priority
Action  Planned Outcome Outcome measures Completion
target
Lead Priority
Rating
(1 high, 3 low)
(CP) Strategic
Framework: Financial,
Workforce, Digital,
Transformation
Strategies
Financial
Management 
Strengthen capital
monitoring 
Financial plans show how
the local authority will align
service provision with
funding to ensure the
sustainability of its services
in the future: 
Automated monthly
monitoring reports 
More accurate forecasts of
capital spend 
Financial planning improves in
line with recommendations
from the Annual Audit Review:
see Section 5 
Pilot assessed and reported to
AMWG 
Reports generated per agreed
timetable 
Lower level of slippage at year
end 
April 2026 
July 2026 
June 2026 
Service
Manager
Strategic
Finance 
Service
Manager
Finance
Operations 
Service
Manager
Strategic
Finance 
1
BV 3.6 
Page 148

Page 149

APPENDIX 3
FINANCE - SERVICE PLAN 2025-2028 (Year 2 refresh) 
5. Service Level
Outcomes or
Priorities
Action Planned Outcome Outcome
Measures
Completion
Target
Lead Priority rating
(1 high, 3 low)
Implement the annual
Procurement
Action Plan (PSAP)
Implement the
actions identified as
priorities in the
Procurement Action
Plan:
- Review Procurement
Policy
Strategic Action Plan
targets achieved 
80% of PSAP
indicators achieving or
exceeding target
March 2027  Service
Manager
Strategic
Finance
2
Implement
recommendations from
the Annual Audit
Report
Implement the
actions agreed with
the auditors: 
- Review
reconciliation of
Property, Plant,
Equipment note to
Fixed Asset Register 
- Review assets with
nil Net Book Value
(NBV) 
- Further develop
Participatory
Budgeting
Improved processes 
Prepare reconciliation 
Determine if any
amendments required 
Capture more
information on
community led
decision making.
Auditor agreement
that actions
implemented in full 
Working paper 
Audit trail for
treatment of assets
with nil NBV 
Amendments made 
Year on year increase
in amount allocated
until 1% of budget (as
defined by COSLA) is
allocated via PB
process. 
September 2026 
2nd review -
June 2026 
July 2026 
July 2027
Chief Financial
Officer 
Service Manager
Finance
Operations 
Service Manager
Finance
Operations 
Service Manager
Strategic
Finance 
1
1
1
1
Page 149

Page 150

APPENDIX 3
FINANCE - SERVICE PLAN 2025-2028 (Year 2 refresh) 
Implement actions
from the Corporate
Asset Management
Plan
Implement the
actions assigned to
Financial Services: 
- Agree timetable for
Asset Management
Plan review
Improve the Asset
Management Planning
process
Actions complete by
assigned due dates 
June 2026 Chief Financial
Officer/Service
Manager
Strategic
Finance 
2
Increase Service
Efficiency – Taxation
Increase efficiency
and digital processes
for Taxation: 
- Streamline Council
Tax e-billing sign up
Process 
- Non-Domestic Rates
e-billing 
Streamline Council
Tax e-billing sign up
process 
Non-Domestic Rates
e-billing - Introduce e-
billing for NDR payers   
Increased uptake of e-
billing 
Increased payments
by Direct Debit 
Generate and
maximise uptake of
NDR e-billing 
April 2027 
April 2027 
Service Manager
Taxation 
2
Increase Service
Efficiency – Accounts
Increase efficiency
and availability of
digital processes for
Accounts. 
- Investigate workflow
for authorisation
database
Introduction of
workflow to facilitate
management of task
Database up to date 
Now subsumed
under FMS
replacement (action
below)
April 2028 Service Manager
Finance
Operations 
2
Replace financial
management system
Contract comes to an
end 2027 – graduate
to new system
Fully functional
integrated financial
management system 
ICT Gateway project
approval 
Procurement Process
Underway 
Procurement Process
Complete
May 2026 
June 2026 
Sept 2026 
Service
Manager
Finance
Operations
1
Page 150

Page 151

APPENDIX 3
FINANCE - SERVICE PLAN 2025-2028 (Year 2 refresh) 
Data loading and
System Testing
Underway 
System operational
Jan 2027 
April 2028
Health and Wellbeing
(Staff)
Ensure the Health and
Work Policy and
Procedures, providing
a supportive and
comprehensive
framework within
which to manage
health and wellbeing
and any absence that
occurs, are applied by
managers
Improve attendance at
work and manage
sickness absence
through additional
targeted support to
assist in maximising
attendance thus
reducing costs and
improve practice and
adherence to policy.
PIs
• Sickness absence
days lost (Service)
(Non-Teacher) 
• % of Sickness
(Service) (Non-
Teacher)
31 March 2027
(Ongoing
Annually)
Service
Managers 
2
ADD ANY NEW SERVICE LEVEL ACTIONS BELOW
Action Planned Outcome Outcome Measures Completion
Target
Lead Priority
rating
(1 high, 3 low)
Increase Service
Efficiency – Taxation
Council Tax: Explore the potential to
introduce a Second Home Premium
and/or Empty Properties Levy
Committee decision Oct 2026 Service Manager
Taxation
2
Strategic Decision Making -
Capital
Review approach to capital
investment with more agile and
strategic focus.
Increase in agility within
capital planning incorporated
into the 27/28 Capital Plan.
Dec 2026 Service Manager
Strategic Finance
2
Page 151

Page 152

Page 152

Page 153

Report to: Corporate Committee Meeting
Date:
26 May 2026  
Report by: Executive Director Economy, Enterprise and Operations    
Author: Rhona Gunn/Alasdair
McEachan 
Contact
Email:
rhona.gunn@moray.gov.uk/
alasdair.mceachan@moray.gov.uk 
Subject: 2025-28 Governance Service Plan (Year 2 refresh) 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  To invite the Committee to consider the Governance Service Plan (Year 2 refresh).  
1.2  This report is submitted to Committee in terms of Section III (A) (4) of the Council’s
Scheme of Administration relating to monitoring performance of the services within the
Committee’s remit in accordance with the Council’s Performance Management
Framework.  
2.  SUMMARY  
2.1  Service Plan (Year 2 refresh) has been prepared identifying the improvement targets for the
remaining term of the plan..  In preparing the plans, managers have taken account of risk,
performance data, the LOIP, the Corporate Plan and other relevant factors such as audit
and inspections outcomes.  The Service Plans also identify the resources allocated to
each service.  
3.  RECOMMENDATIONS  
3.1  It is recommended that Committee consider and approve the Service Plan (Year 2
refresh) for Governance in Appendix 1.   
Rhona Gunn
Executive Director Economy, Enterprise and Operations 
4.  BACKGROUND AND CONTEXT  
4.1  Service planning is a key aspect of the Council’s Performance Management Framework
that sets out the strategic direction for services.
Item 13.
Page 153

Page 154

4.2  It should be noted that actions from the refreshed Best Value Action Plan, approved by the
Corporate Committee on 26 August 2025 (para 8 of the minute refers) will be monitored
and reported out with the Service Plan process.  
4.3  The service planning process focuses on forward planning for medium-term activities
supporting delivery of the Local Outcomes Improvement Plan (LOIP) and Corporate Plan. 
The Council’s planning process also includes team plans that focus on short term tactical
and operational activities supporting delivery of the Service Plan and strategies and
Employee Review and Development Plans (ERDP) and Professional Review and
Development (PRD) plans provide individual planning for employees’ activities and
development.  
4.4  As well as identifying service developments and improvements, the Service Plan
Framework requires an assessment of the output and outcome requirements for services
based on the Council’s priorities, statutory and regulatory requirements and other relevant
local and national direction and makes use of improvement tools for planning and
continuous improvement.  Services support their improvement work with the Public
Sector Improvement Framework (PSIF) or by using another recognised self-evaluation
tool. Across services, priority outcomes are those included in the Council’s Corporate Plan
2024-29 that directly relate to the service or are influenced by the service and should be
clearly identified. 
4.5  Setting clear measurable outcomes and defining key indicators by which progress will be
assessed continues to be an area for development within the Council.  However, it is
recognised that for some actions it can be difficult to identify a measurable outcome (e.g.
a change in legislation that must be implemented or updating a policy framework).
Therefore, as far as possible efforts have been made to set measurable outcomes for
service plan actions but in some cases outputs and key progress milestones have been
used so that it is still possible to measure whether the action has been progressed as
intended. 
4.6  A summary of progress is given below based on the performance monitoring carried out
throughout the year and reported to committee as part of performance reporting.  Further
information on performance at the end of Quarter 4 is included in the service Performance
Reports that are also on the agenda of this Committee.  The Performance reports note
where there is a carry forward of actions from the previous Service Plans. 
4.7  It should be noted that  while there has been some re-organisation of teams and alignment
of services following the management restructure, service plans have been prepared
taking account of Council priorities, national priorities and ongoing and emerging service
priorities.  Therefore, it remains appropriate to seek approval for the year 2 refresh of
Service Plans to ensure that they continue to reflect the next iteration of priorities and
direction from committee and that services are appropriately directed and tasked. 
5.  PROPOSALS  
5.1  As the service has set high level priorities for a three-year period 2025-28, performance is
reported against that period, with actions and indicators being reviewed annually.    
Page 154

Page 155

Planned focus in new plans for Governance
5.2  The revised Council structure has given the opportunity to consider how best to integrate
services corporately and connect service plan activity to gain greater impact from co-
ordinated, cross service effort directed towards the delivery of the Council’s corporate
plan priorities.  As a result, the corporate priority of tackling poverty and inequality has
been identified to provide a common focus across several service plans.  More
specifically, to advance this, services plan will: use whole systems approaches to ensure
there is joined up activity across services and partners; consider how data can be used to
give greater insight to enable targeting and early intervention; and take forward the use of
locality and placed based approaches to drive improved results. 
5.3  Whilst Governance services support front line services, they do not have any direct
actions tackling poverty. 
Governance
5.4  Progress on planned work (success)
• Council Scheme of Delegation has been reviewed and updated. 
• Registrars move to Council HQ has successfully bedded in. 
[Note: detail for services which were formerly Governance, Strategy and Performance
and which have moved to other Heads of Service through the restructure are detailed in
service plans for those Heads of Service.]  
5.5  Progress on planned work (areas for development / not delivered)
• Completion of Business Continuity Plans for all services.  A revised date of June 2026 is
detailed in the Council’s Best Value Action Plan. 
• Legal services recruitment remains an issue. This impacts on other services such as
Social Work and Property Services.  A recruitment campaign for solicitor posts is
underway.  Alternatives to outsourcing are under consideration. 
5.6  Planned focus in new plan (reflecting above and challenges to come)
• Review the Council’s Scheme of Administration to identify potential efficiencies
following the senior management restructure and transfer of children’s services to
MIJB. 
5.7  The service plan for Governance is attached in Appendix 1. 
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) ✓ 
Policy and Legal  ✓
Financial  ✓
Risk ✓ 
Staffing  ✓
Page 155

Page 156

Best Value and Transformation  ✓
Property  ✓
Information Communications Technology/Digital            ✓
Equalities. Social Inclusion and Economic Impact   ✓
Climate Change and Biodiversity Impact  ✓ 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population 
6.3  Policy and Legal 
None arising from this report.  
6.4  Financial 
None arising from this report. 
6.5  Risk 
There are potential risks around progress in all priority areas due to staffing pressures and
which often has an impact on officers.  
6.6  Staffing 
There are no staffing issues.  The service plan actions will be accommodated within
existing resources. 
The services have undertaken workforce planning to consider how best to prepare and
manage the workforce for the services to be able to respond to the agreed Council
priorities in the Corporate Plan and the service work that is required to support and
achieve those objectives.  Consideration has also been given to the Council Workforce
Strategy and Plan priorities in a service context.  The main themes arising from these
include: 
• Building capacity and resilience 
• Change management and a workforce culture to support and enable change.
• Health and Well-being management (including absence management).
Page 156

Page 157

• Recruitment and retention. 
6.7  Best Value and Transformation 
The service plans support the Council to continue its Best Value journey.  
6.8  Property 
None arising from this report.  
6.9  Information Communications/Technology/Digital 
None arising from this report.  However, where relevant work is set out within the
workforce plans to ensure that the workforce is ready and enabled for change, including
digital skills.  
6.10  Equalities, Social Inclusion and Economic Impact 
None arising from this report.  
6.11  Climate Change and Biodiversity Impacts 
None arising from this report.  Whilst Governance service support front line services, they
do not have any direct actions tackling climate change. 
Service contributions to the delivery of the Climate Change Strategy, Biodiversity Strategy,
Net Zero Fleet Strategy, Travel Strategy etc. are captured in the respective annual reports. 
The Corporate Plan recognises that sustainability, environmental, climate change and
biodiversity considerations are incorporated within existing projects and are specifically
considered as part of committee reporting processes.  In a service context, consideration
is also given to Climate Change and Biodiversity under the following main themes with
activities and good practice gathered half yearly within routine performance reporting
processes - 
• Contributing to the reduction of greenhouse gas emissions through reducing energy
use, recycling, planning in a way to allow use of public transport, local procurement
etc.
• Adapting to the effects of a changing climate by integrating changing climate into future
plans and existing projects, tracking weather impacts on services, supporting partners,
customers, and the public to adapt through promoting resilience
Acting in a sustainable manner by enhancing owned greenspaces, planning in a way that
also benefits nature, ensuring staff have the skills and knowledge to protect and restore
biodiversity, help communities and clients connect with nature 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with the Service Managers in Governance
and any comments made have been incorporated into the report.  
8.  BACKGROUND PAPERS  
8.1  Nil.   
Page 157

Page 158

APPENDIX 1
GOVERNANCE - SERVICE PLAN 2025-2028 (Year 2 refresh) 
1. Service
Definition: 
Governance Strategy and Performance
Services to the public: Licensing, Registrars Service, Elections
Support services: Legal (inc Monitoring Officer), Licensing, Committee services. Elected Members support, , Audit and Risk,
Records Management 
2. Service
Resources:
Budget Revenue: £1.967m 
3. What have we identified for improvement in 2026/27 What evidence did we use to identify this improvement? 
Please add benchmark information wherever available and relevant to the
improvement.
Introduce a local Code of Corporate Governance for the Council Benchmarking best practice with other local authorities. 
Update the Council’s records management policies Identified through the Council’s Annual Information Governance Report and subject to
action required by National Records of Scotland. 
4. Local Outcomes
Improvement Plan
(LOIP) / Corporate
Plan (CP)
Outcome or
Priority
Action  Planned Outcome Outcome measures Completion
target
Lead Priority
Rating
(1 high 3
low)
Page 158

Page 159

APPENDIX 1
GOVERNANCE - SERVICE PLAN 2025-2028 (Year 2 refresh) 
No Strategic Actions      
5. Service Level
Outcomes or
Priorities
Action Planned Outcome Outcome Measures Completion
Target
Lead Priority
rating
(1 high 3
low)
Improved Governance Internal Audit: Work with
services to ensure
business continuity
arrangements are up to
date
Business Impact
Assessments reviewed
for all critical services
and business continuity
plans updated as
appropriate
To aid appropriate
response to unplanned
events and
circumstances  
30 June 2026 Head of GSP 2
Legal Services Legal Services: Identify
means to increase staffing
levels
Improve resilience of
legal
advice service
Better balance in 
internal vs external
costs
31 March 2027 Legal Service
Manager
2
Health & Wellbeing Ensure the Health and
Work Policy and
Procedures providing a
supportive and
comprehensive
framework within which to
manage health and
wellbeing and any
absence that occurs are
applied by managers
Improve attendance at
work and manage
sickness absence
through additional
targeted support to
assist in maximising
attendance thus
reducing costs and
improve practice and
adherence to policy.
Reduction in number of
days absence per
employee
31 March 2027 Head of Service 2 
Page 159

Page 160

APPENDIX 1
GOVERNANCE - SERVICE PLAN 2025-2028 (Year 2 refresh) 
ADD ANY NEW SERVICE LEVEL ACTIONS BELOW
5. Service Level
Outcomes or
Priorities
Action Planned
Outcome
Outcome Measures Completion Target Lead Priority
rating
(1 high
3 low)
(CP)
Legislative/Regulatory
Establish a Local Code of
Corporate Governance
Establish
Code as a
primary
Council
governance
document
which informs
the Annual
Governance
Statement
Research model codes
from elsewhere and agree
best model for Moray 
Committee agreement of
Code and review of
arrangements
December 2026 
May 2027
Chief
Governance
Officer
1
(CP)
Legislative/Regulatory
Agree a Council Risk Appetite
Statement and review the
Council’s Risk Register in light of
this
The new
approved Risk
Appetite
Statement
will inform the
Corporate
Risk Register
as well as
report,
programmes,
plans and
policies
Risk Appetite Statement
approved by committee 
Draft and consult on
proposed changes to the
Corporate Risk Register 
Corporate Risk register
reviewed in light of the
Risk Appetite Statement
May 2026 
Aug 2026 
November 2026
Audit and Risk
Manager
1
(CP)
Legislative/Regulatory
Review the Council’s Committee
structure in light of the
management restructure to
ensure effective reporting
Provide clarity
over the
overlaps with
MIJB 
Survey all Heads of
Service and Committee
Chairs 
Revised SOA through
committee
December 2026 
March 27
Democratic
Services
Manager
1
Page 160

Page 161

APPENDIX 1
GOVERNANCE - SERVICE PLAN 2025-2028 (Year 2 refresh) 
Efficiencies in
reporting over
newly aligned
services
Registrars Service Address pressures from
increased volume of business.
Seek efficiencies in ways of
working through contact centre
and digital improvements
Increased
efficiency and
improved
customer
service
To be determined
following specification of
improvements. 
• Will include improved
service availability
• reduced cost per
transaction
March 2027 Democratic
Services
Manager
2
Information
Governance
Records management: review
and update records
management policies
Policies
support
revised
council
information
storage
landscape,
including use
of teams and
sharepoint.
Prioritisation of policies
for review 
All  policies reviewed in
accordance with Records
Management Action Plan 
June 2026 
June 2027
Legal Services
Manager /
information
Governance
Manager
1
Work alongside ICT to roll out
Sharepoint online to services
who currently use shared drives
More
efficiency
through
digitisation
Initial step: migration of
services who currently
use sharepoint to
sharepoint online 
All services migrated to
sharepoint online EDRMS
December 2026 
June 2027
Legal Services
Manager /
Information
Governance
Manager
2
Page 161

Page 162

Page 162

Page 163

Report to: Corporate Committee Meeting Date: 26 May 2026  
Report by: Executive Director Finance, Strategy and Transformation 
Author: Jon Matthews Contact
Email:
jon.matthews@moray.gov.uk 
Subject: Transformation Strategy Development – Interim Update to 31 March 2026 
1.  PURPOSE 
☐ For Decision      ☒  For Information 
1.1  To ask the Committee to consider and note progress on the delivery of the Council’s
Transformation Strategy since the last annual report on 26 August 2025, as part of the
ongoing monitoring of progress.  
1.2  This report is submitted to the Committee in terms of Section III (A) 2 of the Council's
Scheme of Administration relating to considering Capital and Revenue Budgets and long-
term financial plans.  
2.  SUMMARY  
2.1 This report outlines the progress of the Council’s Transformation Strategy up to the end of
March 2026, summarising ongoing projects and future plans aimed at enhancing financial
sustainability and service delivery.
2.2 The report seeks the Committee's consideration of progress made across the projects in
the Council's Transformation Strategy. 
Appendix 1 provides a holistic summary table of the projects in the transformation
programme, logging their status and performance against several metrics. It is noted good
progress has been made across the majority of the projects, with fourteen out of the
seventeen projects having an aggregated RAG status of green, and all projects’ direction of
travel trajectory either being level or upwards. 
Appendix 2 contains the highlight project reports, which are completed and submitted as
part of the Transformation Programme Board governance. As such, they provide additional
level of granularity on each project, across project progress updates, risks and issues, and
next steps within the project. 
2.3 The next Transformation Strategy Update will go to Corporate Committee in September
2026.  
Item 14.
Page 163

Page 164

3.  RECOMMENDATIONS 
3.1  It is recommended that the Committee considers and notes the quarterly update
on the delivery of the Council’s Transformation Strategy.   
Jon Matthews
Executive Director Finance, Strategy and Transformation 
4.  BACKGROUND AND CONTEXT  
4.1  The Council at its meeting on 24 September 2025 (paragraph 13 of the minute refers)
approved Stage 3 of the Council’s Transformation Strategy, which contains opportunities
for new ways of operating to make the council sustainable in the longer term.  This Stage 3
of the Strategy takes forward development of transformation work from the first iteration
that was agreed in April 2024.   
4.2  The updated Strategy approved in September took account of progress made on the
programme of transformation projects, developing projects that came forward from
research and discovery work and new thinking that emerged from workshops held with
councillors and senior officers. The Strategy sets the projects for new ways of operating
against four themes of Community Focused, Sustainable Places, Smarter Internal
Working, and Strategic Economic, Environmental and Regeneration Deevelopent.  The
Strategy outlines ongoing projects and future plans for both these and new areas of work
with the aim of enhancing financial sustainability and improving service delivery.  
4.3 The next steps are to continue the projects as set out in the update and to continue
development of the innovation and discovery areas noted within the Strategy, such as
commercial opportunities and digital and customer services.  
5.  PROPOSALS  
5.1  It is proposed that Committee considers and notes progress on the delivery of the
Council’s Transformation Strategy. 
5.2 Officers will engage with Elected Members to review the reporting framework which
optimises the level of information provided for scrutiny prior to the next substantive report
to Committee in August 2026. 
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) √ 
Policy and Legal  √
Financial √ 
Risk √ 
Page 164

Page 165

Staffing √ 
Best Value and Transformation √ 
Property  √
Information Communications Technology/Digital  √
Equalities. Social Inclusion and Economic Impact            √ 
Climate Change and Biodiversity Impact  √ 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
The Transformation Strategy is the development of the Council commitment in the
Corporate Plan to the values of Ambitious: ensuring sustainable and efficient services;
and Improving: drive improvement, encourage innovation and invest in transforming to
meeting future needs and forms the Transformation Strategy referred to in the Strategic
Delivery Framework. 
The Transformation Strategy and projects contribute to the Council’s priorities of tackling
poverty and inequality, building stronger greener vibrant economy and building thriving,
resilience empowered communities.  The projects also support the strategic delivery
framework of the financial strategy workforce strategy and digital strategy. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☒ Improving wellbeing of our population   
6.3  Policy and Legal 
None.  
6.4  Financial 
The financial implications of the Transformation Strategy have been approved in previous
reports.  Appendix 1 details the cost and savings across the approved projects. 
6.5  Risk 
The risks associated with the transformation programme are managed through the
relevant programme boards and overseen by Extended Corporate Leadership Team (ECLT). 
There are no changes to the current risk profile however, it is noted that reporting is
evidencing continued progress across the programme of projects in the Transformation
Page 165

Page 166

Strategy and progress is being made in maintaining pace which has previously been noted
as a risk. However, the risks associated with change and the success of transformation
remain and will continue to be monitored. 
In order to manage these risks, the Council will:  
i. Ensure that all projects meet a given standard of governance that is proportionate
to the change.
ii. Ensure there are adequate resources for the overall programme of work and for
individual projects.
iii. Manage the dependencies and interdependencies across the scope of the change
and its implications for other areas of prioritised work.
iv. Appoint appropriate project resources and failing which, review whether objectives
are deliverable and review planned work accordingly.  
6.6  Staffing 
There continue to be challenges in securing resources and service capacity to progress
projects. However, the allocation of specific project resources to specific projects is
showing impact with projects such as smarter working and learning estate showing good
progress. This approach is now built in as projects are identified and reach an appropriate
stage.  Resourcing at Council level is being considered as part of the Phase 2 structural
review.  
6.7  Best Value and Transformation 
The Transformation strategy aims to deliver council transformation. 
6.8  Property 
No direct implications from this report, although property is the subject of some of the
projects within the transformation programme, as detailed in Appendix 2. 
6.9  Information Communications/Technology/Digital 
There are no Information Communications/Technology/Digital implications from this
report, although it is an aspect of several of the projects within the transformation
programme, as detailed in Appendix 2.  
6.10  Equalities, Social Inclusion and Economic Impact 
For the purposes of this report an Equality and a Socio Impact Assessment are not
required, however it is acknowledged that various workstreams will identify change that
will have an impact on equalities and socio-economic considerations and will be reported
in due course.  
6.11  Climate Change and Biodiversity Impacts 
There are no immediate climate change implications directly arising from this report.
However, the energy projects contribute to future environmental sustainability and climate
change, as detailed in Appendix 2. 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with the Extended Corporate Leadership
team who have been involved in the ongoing development of the transformation
Page 166

Page 167

programme, including as the project initiation board reviewing new mandates and driving
forward specific project work. 
8.  BACKGROUND PAPERS  
8.1  Vehicles: Pool Car paper (Member access only) 
8.2  23 April 2024 Corporate Committee (item 06 Report ) and Appendix)
8.3  24 April 2024 Special Full Council (item 04 Report and Appendix 1 and Appendix 2)
8.4  13 August 2024 Full Council (item 6a Report and Appendix 1 and Appendix 2
8.5  5 November 2024 Corporate Committee (item 16 Report and Appendix) 
8.6  28 January 2025 Corporate Committee (item 09 Report and Appendix) 
8.7  10 June 2025 Corporate Committee (Item 08 Report)10 June 2025 Corporate Committee
(Item 08 Report incorporating Appendix) 
8.8 26 August 2025 Corporate Committee (Item 10 Report incorporating Appendix)) 
8.8 26 August 2025 Corporate Committee (Item 10 Report)
8.9 24 September 2025 Full Council (Item 11 Report) 
8.10 17 February 2026 Corporate Committee (Item 9 Report) 
Page 167

Page 168

APPENDIX 1
TRANSFORMATION PROGRAMME SUMMARY TABLE 
RAG status is aggregation of the three RAG categories in the project highlight reports. 
Revenue Capital
Future Workforce Sustainability Jul'26 £120 £1,000 Upwards G
Depot and Stores Rationalisation Sustainability Sep'28 £7,500 £210 £3,400 Level G
Industrial Estate Economy Dec'26 Confidential -  commercial negotiation Level G
Customer Service CRM Sustainability Dec'26 £350 Service Quality / Capacity Level G
BIM System Sustainability Jan'28 £72 Service Quality / Capacity Level G
LED Lighting Economy Mar'28 £218 £38 Level G
Solar PV Sustainability Mar'28 £333 £53 Level G
ICT & Digital – Housing Repairs Community Dec'25 Service Quality / Capacity Upwards G
Raising Attainment: Well-being (ASN) Community Feb'26 Service Quality / Capacity Level G
Smarter Working Phase 3 (Homes) Sustainability Mar'26 £115 £200 £250 Level G
Business Support for Schools Sustainability Mar'26 £27 Level G
Digital Inclusion Raising Attainment Sustainability Mar'26 £25 Service Quality / Capacity Upwards G
Just Transition Economy Apr'26 £3,200 Wide ranging business case Level A
Moray Growth Deal Economy Dec'31 £92,848 Wide ranging business case Level R
Levelling Up 3 Poverty Mar'28 £18,300 Wide ranging business case Upwards G
Elgin Neighbourhood Board Community 2036 £20,000 Wide ranging business case Upwards G
Learning Estate Community Mix £116,000 Wide ranging business case Level A
Major
Programmes
Stage Project Corporate
Priority
Target
Date
Direction
of Travel RAG Status
Concept /
Development
Implementation /
Delivery
Complete /
Closing
Project
Funding (£'k)
Annualised Benefit (£'k)
Page 168

Page 169

APPENDIX 2 
TRANSFORMATION PROJECT HIGHLIGHT REPORTS 
Project Title: Future Workforce
SRO/PM: H/ People, Change & Community Strategy / Senior HR Advisor 
Phase Budget Info RAG
Insert RAG colour and text per row.
Ensure reason for amber/red remedies in update
Project
Target
End
Date
%
Project
£
Revenue
Saving £
Capital
Saving £
Objectives Budget Schedule
DEFINITION £120K Approx.
£1,000,000
per annum
N/a GREEN GREEN AMBER  Jul 26 45
Transformation Strategy Priorities
Mark with a x which associated with project
Trend
Mark with a x under applicable arrow
Poverty Economy Community Sustainability               
X X  
Progress Update
To include reason for
Red/Amber status and
actions to get back to
Green
• Research phase completed 
• Analysis of working hours and T&Cs (including working hours) completed 
• Benchmarking with other councils completed
• Scoping exercise undertaken in conjunction with Service managers to
determine any implementation risks of changing standard working week 
• IIA drafted – needs developed as project progresses, due to complexity of
scoping process and potential impact on specific groups of staff 
Risks and Issues Overall risks with project: 
Business risks:
- Customer service: Internal and external 
- Public reputation 
- Longer wait times / reduced service access 
- Industrial action
- Low morale and employee or customer dissatisfaction 
Service / Operational / Implementation risks:
- Timescales for landing all elements 
- Employee relations within services  
- Instability – prolonged period of change for employees 
- Risk of statutory deadlines / targets not being met 
- Loss of grant funding if timescales not met 
- Cost risks: Need to use more overtime / agency / recruit extra staff 
- Collective bargaining / change management process / timescales 
- Increased absence / labour turnover 
- Risk of additional costs through additional overtime or FTE required
- Some tasks may need stopped / reduced 
- Workload – some services are already struggling to deliver workload, and                 
this can be compounded with vacancies / difficulties in recruitment 
Next Steps  •Recommendation on which (and the sequencing of) ways of working and terms &
conditions changes should be delivered to ensure a sustainable, competitive
employment package
•Complete full business case to progress
•Engagement and collaboration with Trade Unions 
Page 169

Page 170

Project Title: 19-0003a Depot and Stores Rationalisation
SRO/PM: H/Housing, Property & Communities / Depot & Stores Proj Officer
Phase Budget Info RAG
Insert RAG colour and text per row.
Ensure reason for amber/red remedies in update
Project
Target
End
Date
%
Project
£
Revenue
Saving £
Capital
Saving £
Objectives Budget Schedule
PLANNING £7.5M £210,028 £3.4M GREEN GREEN GREEN Sep 28 9%
Transformation Strategy Priorities
Mark with a x which associated with project
Trend
Mark with a x under applicable arrow
Poverty Economy Community Sustainability               
X   X
Progress Update
To include reason for
Red/Amber status and
actions to get back to
Green
Status: GREEN
The project remains GREEN, with steady progress across key operational planning
workstreams. The overall position is stable, and the refined sequencing continues
to support realistic delivery expectations 
Progress since last period:
• Work Breakdown Structures (WBS) have now been completed for each service
and site. These have fed directly into the delivery sequencing, which has been
refined to align more closely with operational capacity and service
requirements, with tasks now assigned accordingly. 
• Depot release activity continues, with Tyock, Skateneuk and Auchenhove all
progressing. Tyock remains on track for its planned March 2026 closure, and
interest/ownership discussions are underway for Skateneuk. 
• In line with the Full Business Case, preparations are underway to return to the
ED&I Committee in June to provide a formal delivery update. 
Risks and Issues • Delivery sequencing: Continued refinement is needed to keep plans aligned
with operational capacity. 
• Consultation timelines: Depot closures remain dependent on consultation and
change processes being concluded as expected. 
• Resource transition: Although stabilising, the shift in Project Officer resourcing
continues to require oversight to maintain momentum. 
• Key dependencies: ICT, Estates and service availability continue to influence
sequencing and delivery timescales. 
Next Steps  • Progress Tyock Depot, Skateneuk, and Auchenhove closure activity through to
implementation.
• Continue service-level discussions to confirm operational needs and
dependencies for further depot release opportunities.
• Embed the refined delivery sequencing into live operational planning for
individual depot sites. 
• Prepare a draft report for the June ED&I Committee meeting, in line with Full
Business Case commitments. 
Page 170

Page 171

Project Title: 24-012 Industrial Estate (Transformation Strategy)
SRO/PM: H/Housing, Property & Communities / SM/Property, Estates & Assets
Phase Budget Info RAG
Insert RAG colour and text per row.
Ensure reason for amber/red remedies in update
Project
Target
End
Date
%
Project
£
Revenue
Saving £
Capital
Saving £
Objectives Budget Schedule
DELIVERY - - - GREEN GREEN GREEN 12/26 75%
Transformation Strategy Priorities
Mark with a x which associated with project
Trend
Mark with a x under applicable arrow
Poverty Economy Community Sustainability             
X     X
Progress Update
To include reason for
Red/Amber status and
actions to get back to
Green
Project details, including financial information, risks and issues, and next steps are
treated as confidential while transaction live. Details are included in Committee
report to Council on 25 February. 
Risks and Issues 
Next Steps   
Page 171

Page 172

Project Title: 24-016 Customer Service CRM and systems support
SRO/PM: H/Customer Experience, ICT & Digital Services / Business Support TL, Customer
Svcs &Exp
Phase Budget Info RAG
Insert RAG colour and text per row.
Ensure reason for amber/red remedies in update
Project
Target
End
Date
%
Project
£
Revenue
Saving £
Capital
Saving £
Objectives Budget Schedule
Delivery 350k   GREEN GREEN GREEN Dec 26 20
Transformation Strategy Priorities
Mark with a x which associated with project
Trend
Mark with a x under applicable arrow
Poverty Economy Community Sustainability               
X   X
Progress Update
To include reason for
Red/Amber status and
actions to get back to
Green
• Project marked as GREEN as currently on-time and in-budget.
Project plan in place; Project Board and Team assembled. 
• All contract paperwork signed 05/01/26
• Existing CRM process mapping fully completed
• Formal service engagement workshops commenced
Risks and Issues A comprehensive project risk register has been developed and is being actively
maintained as part of the overall Project Plan. The primary risk related to the
delayed contract signing an issue outside Moray Council’s control which has
resulted in significantly compressed timescales for build, testing, and go-live
activities. This is further impacted by the absence of any discovery sessions with
Netcall to date and lack of Netcall project team. 
Internal governance arrangements are well established, with regular Project Board
and Project Team meetings in place. The Moray project team has now completed
the majority of the required Netcall training. Service Engagement workshops have
been delivered throughout January and February, with only two remaining to be
completed in March. 
Approval has been secured to utilise an element of the project staffing underspend
to appoint an additional Project Officer. This role will provide essential capacity to
support build, test, and go-live activities in light of delays in Netcall mobilising their
project team. 
Netcall have confirmed their project team will be in place from March 26.
Next Steps  Finish initial Service Engagement workshops (Mar 26)
Discovery sessions with Netcall (Mar 26)
Start CRM build (Mar 26) 
Page 172

Page 173

Project Title: 21-0010 Buildings Information Management Systems (BIM)
SRO/PM: H/Housing, Property & Communities / Senior Asset Management Officer
Phase Budget Info RAG
Insert RAG colour and text per row.
Ensure reason for amber/red remedies in update
Project
Target
End
Date
%
Project
£
Revenue
Saving £
Capital
Saving £
Objectives Budget Schedule
DELIVERY 72 - - GREEN GREEN AMBER Jan
2028
3
Transformation Strategy Priorities
Mark with a x which associated with project
Trend
Mark with a x under applicable arrow
Poverty Economy Community Sustainability             
X     X
Progress Update
To include reason for
Red/Amber status and
actions to get back to
Green
Reason for Amber: 
• The schedule is currently Amber due to ongoing work with the consultancy 
to finalise key delivery details. The key headings and general content for the 
remaining work packages are now defined. The remaining content for 
Workstream 1 and Workstream 3 has been agreed, and a requisition was 
raised on 18 February. However, planning activities with Okana cannot 
progress until Procurement raises the order.
• Training completion, sitting at 13% after six weeks of access to the training 
materials. 38% of staff have logged in to the platform. This is largely due to 
current workload pressures across teams. 
To return Green:
• Procurement to raise the outstanding order so that Property and Okana can 
begin developing the delivery plan and timeline for the remaining content of 
Workstream 1 and all of Workstream 3.
• Once planning is complete, detailed content and costings will be requested 
for the remaining workstream packages.
• Training is required to be completed prior to remaining Workstream 1 
content being delivered. 
Risks and Issues Okana and Property are currently planning the workstream packages required to
review and audit our existing EDRMS (Electronic Document & Records
Management System) and CDE (Common Data Environment). At the same time, IT
are progressing the implementation of new Microsoft 365 services and
configurations. This overlap introduces a risk that the review may not accurately
reflect the future operating environment or fully identify the changes required. This
will continue to be closely monitored. 
The schedule status has moved to Amber. While Property remain confident the
workstreams can be delivered within the agreed timeframe, planning for the
remaining content cannot advance until Procurement raises the outstanding order.
Detailed timelines and resource plans from Okana will only be available once this
order is in place. 
In addition, progress is at risk due to low training completion. Only 13% of training
has been completed after six weeks, with 38% of staff having logged in. If personnel
do not complete the required training, upcoming group sessions during
Workstream 1 and later workstreams may not be fully effective, reducing the
benefit and potentially impacting delivery confidence. 
Page 173

Page 174

Next Steps  • Procurement to raise the outstanding order to enable Property and Okana 
to progress detailed planning for the remaining content of Workstream 1 
and all of Workstream 3.
• Work with Okana to develop the delivery plan and timelines for the 
remaining workstream packages once the order is in place.
• Request detailed content and costings for the outstanding workstream 
packages following completion of the planning stage.
• Increase training completion across all identified personnel, ensuring staff 
have the required foundation ahead of group sessions in Workstream 1 and 
subsequent workstreams. 
Page 174

Page 175

Project Title: 24-010 LED 
SRO/PM: H/Housing, Property & Communities / SM/Property, Estates & Assets
Phase Budget Info RAG
Insert RAG colour and text per row.
Ensure reason for amber/red remedies in update
Project
Target
End
Date
%
Project
£
Revenue
Saving £
Capital
Saving £
Objectives Budget Schedule
DELIVERY £218k £38k - GREEN GREEN GREEN Mar 28 33
Transformation Strategy Priorities
Mark with a x which associated with project
Trend
Mark with a x under applicable arrow
Poverty Economy Community Sustainability             
X     X
Progress Update
To include reason for
Red/Amber status and
actions to get back to
Green
Initial work on next phase of new lighting in school properties progressing. 
Review of delivery method progressing taking account of reduction in design option
in house. Option on delivery will be presented as part of sign off of each project by
Chief Finance Officer and Head of HP and C. Will be reliance on external support
for design. 
Planning for work at Moray Resource Centre, Buckie library and Lhanbryde PS
underway with works due in 2026. 
Costs and savings depends on projects taken forward with budget approved on
spend to save principles paper to Transform Borad of 24 March demonstrated
savings being achieved.
Risks and Issues Continues to be some concern around future programme which relies on spend to
save principles which limits expenditure in advance of approved project. Lookng at
options to ensure induvial work packages can be developed without creating cost
pressures. 
Next Steps  Paper on savings generated to be shared with CLT. 
Continue to develop programme for wider estate and provide proposals for the next
phase of projects looking at high energy consuming sites. 
Work being undertaken to ensure works link to any planned works in other assets. 
Page 175

Page 176

Project Title: 24-011 Solar PV 
SRO/PM: H/Housing, Property & Communities / SM/Property, Estates & Assets
Phase Budget Info RAG
Insert RAG colour and text per row.
Ensure reason for amber/red remedies in update
Project
Target
End
Date
%
Project
£
Revenue
Saving £
Capital
Saving £
Objectives Budget Schedule
DELIVERY £333k £53k - GREEN GREEN GREEN Mar 28 33
Transformation Strategy Priorities
Mark with a x which associated with project
Trend
Mark with a x under applicable arrow
Poverty Economy Community Sustainability               
x   X
Progress Update
To include reason for
Red/Amber status and
actions to get back to
Green
New software package being implemented jointly with Climate Change Team to
help in assessing energy savings/value for money calculation for future
projects. 
Work progressing to identify next projects. 
Costs and savings depend on projects taken forward with budget approved on
spend to save principles paper to Transform Borad of 24 March demonstrated
savings being achieved.
Risks and Issues Continues to be some concern around future programme which relies on spend
to save principles which limits expenditure in advance of approved project.
Looking at options to ensure induvial work packages can be developed without
creating cost pressures. 
Next Steps  Paper on savings generated to be shared with CLT.  
Submit proposals for approval under delegated powers focusing on properties
with high electrical usage. 
Page 176

Page 177

Project Title: 22-007: ICT & Digital – Housing Repairs
SRO/PM: SM/Building Svs / Senior Project Officer H&P
Phase Budget Info RAG
Insert RAG colour and text per row.
Ensure reason for amber/red remedies in update
Project
Target
End
Date
%
Project
£
Revenue
Saving £
Capital
Saving £
Objectives Budget Schedule
CLOSURE    GREEN GREEN GREEN Dec 25 97
Transformation Strategy Priorities
Mark with a x which associated with project
Trend
Mark with a x under applicable arrow
Poverty Economy Community Sustainability              
X    X
Progress Update
To include reason for
Red/Amber status and
actions to get back to
Green
As a result of the Change Request submitted in September, the project was
extended to December 2025 and is now in the Closure Phase
• The issue with the customer facing version of the repair’s online customer
reporting tool has been resolved. As a result, the updates which promote
online booking for non-Emergency repairs have been implemented on the
Customer facing webpage. 
Note: The Repairfinder functional updates will be held over for
implementation in next financial year as they will have financial
implications.
• The Moray Mobile application development and implementation have  been
completed for both the Planner and standard version  
o The revised app for operatives has been rolled out with no further
issues. Note: The next version of the app with additional features
will be developed and rolled out post project
o The Planner App for the Schedulers with its additional functionality
has been tested and was implemented with the Scheduling Team
from 24th November which allows jobs to be retained on the system
for non-mobile workers e.g. contractors 
• Operationally annual leave and existing vacancies within trades have
continued to impact but the service is still being maintained. However, two
new processes have been implemented which keep cases open and retain
on the system to allow better management and reporting are now in place.
• Procedures being updated and handed over to Senior Scheduler
• Out of Hours service continues to evolve operationally with further small
amendments.
• The interim processes to cover the end of the X Tag application and the
implementation of the new NEC module is now fully in place with legacy
data now available on an internal server.
Risks and Issues RED Risk & Issues - None to report 
Next Steps  • Monitor and finalisation of Phase 2 “To Be” processes and handover
• Repairfinder Diagnostics tool - Finalise update of Repairfinder diagnostic tool
and online tool server fix.    
• Complete end of project report 
Page 177

Page 178

Project Title: 18-013 Raising Attainment: Well-being (ASN)
SRO/PM: H/Education / SM/Business Support
Phase Budget Info RAG
Insert RAG colour and text per row.
Ensure reason for amber/red remedies in update
Project
Target
End
Date
%
Project
£
Revenue
Saving £
Capital
Saving £
Objectives Budget Schedule
CLOSURE    GREEN GREEN GREEN Feb’26 95%
Transformation Strategy Priorities
Mark with a x which associated with project
Trend
Mark with a x under applicable arrow
Poverty Economy Community Sustainability              
X    X
Progress Update
To include reason for
Red/Amber status and
actions to get back to
Green
End of project report went to ECLS in February 2026.  Project now closed
Risks and Issues Ongoing risks sit within business as usual with bi-annually reports to committee.
Next Steps  As above. 
Page 178

Page 179

Project Title: 22-013 Smarter Working Phase 3
SRO/PM: H/Housing, Property & Communities / SM/Property, Estates & Assets
Phase Budget Info RAG
Insert RAG colour and text per row.
Ensure reason for amber/red remedies in update
Project
Target
End
Date
%
Project
£
Revenue
Saving £
Capital
Saving £
Objectives Budget Schedule
CLOSURE £115k 200K 250K GREEN GREEN AMBER MAR 26 80%
Transformation Strategy Priorities
Mark with a x which associated with project
Trend
Mark with a x under applicable arrow
Poverty Economy Community Sustainability               
X   X
Progress Update
To include reason for
Red/Amber status and
actions to get back to
Green
Status: GREEN
The project remains GREEN, with steady progress across all remaining
workstreams. The overall position is stable, and activities are transitioning into
business-as-usual (BAU) as planned. The schedule remains AMBER due to
licensing implementation timelines extending beyond March 2026. 
Progress since last period:
• All snagging works at Rose Cottage have now been fully completed, finalising
the closure of 10 Duffus Road. 
• Storage rationalisation and space utilisation work continues, with ongoing
efforts to reduce surplus items and support directorates in managing
workspace requirements effectively. 
• Corporate Phonebook: The core review phase is complete, and the work has
now moved into the next stage of the process for implementation and ongoing
maintenance. 
• Smarter Working SharePoint Site: Development is underway on a redesigned
SharePoint site for the Smarter Working Interchange pages. The new version
aims to be more intuitive, interactive, and easier for staff to navigate, with
refreshed content and improved signposting. 
Risks and Issues • Relocation timelines for April and May 2026 remain on track; continued
coordination is required to prevent slippage. 
• Resource pressures continue to impact the pace of storage and space planning
activity, though progress is being maintained. 
Next Steps  • Continue supporting storage and space utilisation activity, ensuring alignment
with wider accommodation planning. 
• Embed BAU processes and updated guidance into the new Smarter Working
SharePoint site and support its transition into live use. 
Page 179

Page 180

Project Title: 19-007a Business Support for Schools (Schools Business Admin)
SRO/PM: H/Education / SM/Business Support
Phase Budget Info RAG
Insert RAG colour and text per row.
Ensure reason for amber/red remedies in update
Project
Target
End
Date
%
Project
£
Revenue
Saving £
Capital
Saving £
Objectives Budget Schedule
Closing  27k n/a GREEN GREEN AMBER Mar 26 80
Transformation Strategy Priorities
Mark with a x which associated with project
Trend
Mark with a x under applicable arrow
Poverty Economy Community Sustainability               
X   x
Progress Update
To include reason for
Red/Amber status and
actions to get back to
Green
Updated paper to ECLS on 25/11/25 included ELC roll based option.  Was agreed
and change management plan being implemented.  Saving agreed.
Risks and Issues 
Next Steps  Move to end of project report 
Page 180

Page 181

Project Title: 21-014 – Digital Inclusion Raising Attainment: Curriculum Breadth – Digital
Inclusion
SRO/PM: H/Educ & H/Customer Exp, ICT & Digital S 
SM/ ICT Infrastructure
Phase Budget Info RAG
Insert RAG colour and text per row.
Ensure reason for amber/red remedies in update
Project
Target
End
Date
%
Project
£
Revenue
Saving £
Capital
Saving £
Objectives Budget Schedule
Closing 24,500 N/A N/A GREEN GREEN AMBER Mar 26 95
Transformation Strategy Priorities
Mark with a x which associated with project
Trend
Mark with a x under applicable arrow
Poverty Economy Community Sustainability               
X X  
Progress Update
To include reason for
Red/Amber status and
actions to get back to
Green
All of the in-scope devices from the initial iPad asset list have been enrolled in the
MDM system. All new devices are procured with a licence and are fully enrolled
prior to their deployment by default.  The total number of devices enrolled is just
over 1306, of which 307 are devices procured after the start of the MDM
implementation. 
On that basis, the project is now considered to have moved to business as usual.   
Risks and Issues • No new risks / issues
Next Steps  • End of project report
• Project closure 
Page 181

Page 182

Project Title: Just Transition
SRO/PM: H/Growth Planning & Climate / SM/Strategic Planning & Dev
Phase Budget Info RAG
Insert RAG colour and text per row.
Ensure reason for amber/red remedies in update
Project
Target
End
Date
%
Project
£’m
Revenue
Saving £
Capital
Saving £
Objectives Budget Schedule
CONCEPT 3.2   AMBER AMBER GREEN April
2026
65%
Transformation Strategy Priorities
Mark with a x which associated with project
Trend
Mark with a x under applicable arrow
Poverty Economy Community Sustainability             
X     X
Progress Update
To include reason for
Red/Amber status and
actions to get back to
Green
Project development proceeding, series of sub-groups working up project
development templates. 
Roundtable engagement session held with local MPs and MSPs, and members of
CCWG held on 8 January. 
Meeting with Council Leader and Cabinet Secretary for Climate Action held on 21
January. Agreed next steps including SG officials identifying additional/alternative
funding opportunities from across government to support projects. 
Report to Council on 28 January agreed project shortlist, process for bid
submission, next steps and ongoing engagement with MPs/MSPs and JCC. 
Met with Scottish Government officers mid February and talked through projects
and likely timescales for Fund opening. Fund subsequently opened start of March
with submissions to be lodged by 11th May. 
Officers working up details of what will go into bid, what elements could be multi
year and how Prospectus can be updated to maintain the longer term aspiration. 
Risks and Issues Risk that funding is not made available in subsequent years to support delivery of
projects. Risk that multi year approach for some projects is not supported.
ambition.
Next Steps  Project subgroups to meet to refine/finalise project templates, identify other
funding and firm up what will be included in this years bid. 
Officers to meet with JT Fund officials in late March/ early April to discuss how bid
is shaping up. 
Page 182

Page 183

Project Title: Moray Growth Deal Programme
SRO/PM: SRO:  Rhona Gunn, Executive Director Economy, Environment and Operations /
Programme Manager:  Michael Kelly, Service Lead (Growth Deal)
Phase - 8
projects
within
programme
Budget Info RAG
Insert RAG colour and text per row.
Ensure reason for amber/red remedies in update
Project
Target
End
Date
%
Project
£’000
Revenue
Saving £
Capital
Saving £
Objective
s
Budget Schedule
- 6 in delivery
- 1 pre-
delivery (BE
Hub)
- 1 to be
scoped
(skills)  
£92,848 n/a n/a Amber /
Red
Amber /
Red
Amber Dec 31 n/a
Transformation Strategy Priorities
Mark with a x which associated with project
Trend
Mark with a x under applicable arrow
Poverty Economy Community Sustainability             
X     X
Progress Update
To include reason
for Red/Amber
status and actions
to get back to Green
Amber / red status a result of challenges being experienced on 2 Growth
Deal projects.  Work actively being progressed to mitigate these that will
enable the RAG indicator to be downgraded during Q1 2026/27 FY.   
Skills project
Positive progress being made.  Outputs from Optimat work considered at a
special meeting of the MGD Programme Board on 13 March.  At this,
approval was granted for the recommended option to be advanced to a
Strategic Outline Case (SOC) stage subject to a number of conditions.   
Optimat are working to complete the SOC by 31st March, with the PMO in
dialogue with the lead partner to secure commitment regarding how they
will approach and finance revenue costs associated with the OBC and FBC
stages.  The aim is that at the 30 April MGD Programme Board, members will
be asked to formally approve the adoption of this project into the Deal and
for the Government review process to commence.  An update paper will
submitted to 6 May Moray Council. {Post Script: now delayed to Council at
end of June} 
Moving the Business Enterprise Hub project into delivery
Whilst progress has been slow, activity at the beginning of March indicates
resolutions are being identified for outstanding issues.  A verbal update can
be provided at the Transform Meeting, but all parties are being asked to
conclude agreements and for the site to move into delivery by the end of
March.   
Outside of these, recent milestones to highlight are: 
- EY STEM:  Visit by HRH Duke of Gloucester on 6 March and a pilot
session on 7 March for families to visit the centre, with over 120
attending over four, 1 hr sessions.
Page 183

Page 184

- Member briefings:  Across 2 and 9 March, briefing sessions were
provided for Councillors on the status of all projects. 
Risks and Issues  Programme Level 
Risk Mitigation 
Ability to realise benefits stated in full
deal document (2021), specifically
around job creation.  This is due to a
key project (skills) still being in
development.  
- PMO working with PMs during Q4 to
enhance benefits monitoring
approach.  
- Outcome of skills consultancy work
will provide indicative view of
benefits that can be generated from
finial project.   
- Revised Scottish Government
benefits guidance due late Q4 / early
Q1, informing the development of a
revised benefits plan.   
With flat Government funding,
inflationary pressures could affect the
ability of projects to deliver some or all
of their outputs.
- Continued focus on cost, through
the agreement of fixed price
agreements, use of cost consultants
and understanding fallback value
engineering opportunities.  
- Projects to be aware of and explore
external funding opportunities. 
Project level 
Risk Mitigation 
Positive Bus Revolution passenger
numbers are predominantly from
concessionary card users which
weakens the revenue sustainability of
services.  
Ongoing work to review evidence in
advance of seeking approval for phase
3 expansion plans:  AI review of service
activity and modelling of mobile data
transport data.    
Inability to move BE Hub project into
delivery and advance the full
development potential of South Street
site.  
Work ongoing between the Council and
Robertsons Property Limited to identify
a replacement RSL for the site.  Aim is
for a positive outcome late Q4 at which
point all parties can finalise legals and
construction can start.  
Failure to secure sufficient funding to
progress all or an economical viable
phase of Grant Lodge renovation
activity.
Project will not move into construction
tender phase until sufficient funding in
place and applications have been
made for external funding.  Paper due
to be submitted to Council on 6 May
regarding next steps.  
Inability to identify a proposal for a
replacement skills project that is
capable of meeting Government Green
Book requirements.
Optimat consultancy work continues. 
Expectations is that by the 30 April
MGD Programme Board a decision will
be taken on whether to adopt a new
skills project into the Deal.   
Page 184

Page 185

Next Steps  April   
- Decision sought from MGD Programme Board on 30 April to formally
approve the skills SOC and to move this into the outline business
case stage (whilst seeking Government approval for this change).   
May 
- 2 papers being submitted to the 6 May Moray Council meeting:  Grant
Lodge update and skills project papers (both confidential)
- The annual report paper will be submitted to the 26 May Corporate
Committee meeting as part of the wider annual Transformation
update and then the 3 June Community Planning Board meeting.   
Page 185

Page 186

Project Title: 24-005 Levelling Up 3
SRO/PM: H/Growth Planning & Climate / SM/Strategic Planning & Dev
Prg Manager LUF
Phase Budget Info RAG
Insert RAG colour and text per row.
Ensure reason for amber/red remedies in update
Project
Target
End
Date
%
Project
£
Revenue
Saving £
Capital
Saving £
Objectives Budget Schedule
DELIVERY £18.3M   GREEN GREEN GREEN Mar 28 20
Transformation Strategy Priorities
Mark with a x which associated with project
Trend
Mark with a x under applicable arrow
Poverty Economy Community Sustainability            
X    X  
Progress Update
To include reason for
Red/Amber status and
actions to get back to
Green
• Main contractor appointed, Pat Munro for delivery of projects within LUF
Procurement Framework (civils, active travel, small building projects).
• Proposed changes reported to Council in August with further report agreed
by Council in February 2026.
• Legal agreements, consents and design all being progressed across the
projects.
• South Street development delayed until RSL partner confirmed. Legals
finalised.
• Gordon Arms Hotel title concluded and contract awarded. 
Risks and Issues • Risk of not agreeing terms with landowners/ developers.
• Cost of materials and availability of workforce.
Next Steps  • Physical works start in Cooper Park at the toilet block and the pond.
• Conclude Heads of Terms for central regeneration project.
• Complete design works for all 2026/27 projects and finalise programme of
works.
• South Street conclude all legals and works start on site in April 
Page 186

Page 187

Project Title: 24-004 Plan for Neighbourhoods - Elgin Neighbourhood Board
SRO/PM: H/Growth Planning & Climate / SM/Strategic Planning & Dev
Phase Budget Info RAG
Insert RAG colour and text per row.
Ensure reason for amber/red remedies in update
Project
Target
End
Date
%
Project
£’m
Revenue
Saving £
Capital
Saving £
Objectives Budget Schedule
CONCEPT 20   GREEN GREEN GREEN 10 yr  
Transformation Strategy Priorities
Mark with a x which associated with project
Trend
Mark with a x under applicable arrow
Poverty Economy Community Sustainability              
X  X  
Progress Update
To include reason for
Red/Amber status and
actions to get back to
Green
• Community engagement completed. Projects assessed and scored.
Regeneration Plan and Vision finalised and submitted by the deadline of
28th November.
• Report agreed at 6 November Council meeting.
• Working on updated Terms of Reference and a public “easy read” summary
of the Regeneration Plan.
• Preparing to move into Delivery and liaising with projects which have been
included.
• Chair and Vice chair of Board have indicated their intention to stand down
in the coming months once recruitment for their replacements has been
completed. Recruitment process will begin mid March with aim of reporting
recommended chair and vice chair to Council in June.
• Suggestion that feedback for all Towns in the Programme won’t be given
until 31st March. No questions have been raised by MHCLG about the Elgin
Regeneration Plan and informal feedback is very positive about the quality
and detail.
Risks and Issues Risk around future maintenance costs for the Council which is mitigated by a
maintenance bond approach.
Next Steps  • Receive feedback on the Regeneration Plan and Vision to UK Government
and make any changes necessary.
• Host event likely in August to raise awareness of projects in the Plan which
could be a wider Elgin Regeneration event.
• Complete “easy read” summary version of Plan and Vision.
• Update Terms of Reference approved. 
Page 187

Page 188

Project Title: Schools for Future – Learning Estate Strategy Delivery Programme
SRO/PM: Corporate Director (Education, Housing and Communities)/Service Manager
(Education Estate)
Phase Budget Info RAG
Insert RAG colour and text per row.
Ensure reason for amber/red remedies in update
Project
Target
End
Date
%
Project
£’m
Revenue
Saving £
Capital
Saving £
Objectives Budget Schedule
Major
Program
me - Mix
116.0
(Yr: 26/27
-28/29)  
GREEN AMBER AMBER ON
GOING 
Transformation Strategy Priorities
Mark with a x which associated with project
Trend
Mark with a x under applicable arrow
Poverty Economy Community Sustainability              
X    X
Progress Update 
Risks and Issues 
Next Steps 
o Findrassie – project continues to be on hold due to updated roll forecasts. 
o Elgin High School: Agreement to scale down project to internal
refurbishment option delivering 950+ capacity. Progress Concept design with
Hub support, progressing as planned. 
o Forres Academy: Completion of baseline RIBA Stage 3-4 Detailed Design Apr
26. Hub Stage 2 report due May. Approved Planning Application - Special
Committee Meeting 14 Jan 2026. Schools Act (2010) Consultation on school
relocation approved by Council 25 Feb 26. Common Good - application to Court
of Session late Nov – 1st hearing substantive hearing 5th May, further hearing with
decision planned 11th May 26. Planned Full Business Case (final budget sum) and
Contract progression agreement - target full Council 19 May 2026. Overall project
- AMBER due to risk of delay in any of the statutory approvals impacting critical
path. 
o Buckie – Phase hybrid project option 58 -72 months -- November ECLS report
recommendations approved including options to continue being explored via
continued use of hub appointed external design team in preparation for any
future potential funding bids. Reviewing options for transfer of LEIP2 to element
of Phased Hybrid project - letter to Scottish Government following ELCS
Committee 23 Jun 26. 
o B-B Upgrade work – Initial 5 schools Phase 1 fabric first programme approved
and progressing. Further 5 schools identified to complete design to 'ready for
tender' stage.
• Completed: Speyside HS, Milnes HS, East End PS, Rothes PS (Phase 1),
Mosstodloch Phase 1, Mortlach Phase 1.
• Construction Phase: Cullen PS - Phase 1 complete (external render -
delayed). Phase 2 Mar/Apr 26; Rothes PS (Phase 1 in progress); Mortlach
PS(Phase1 in progress), Alves PS  - project delay due to design complexity,
procurement issues. 
• Design Phase: Rothes Phase 2, Mosstodloch Phase 2. Mortlach Phase 2
Dyke, Burghead, Bishopmill, Aberlour and Knockando 
ASN Future Requirements: to be determined ASN Review infrastructure
requirements. ASN capacity increase project planned for Millbank Primary school
– Jun/Jul 2026. 
Page 188

Page 189

School Condition Surveys: All School Surveys completed. Plan for next cycle
from 2026. 
School Suitability Surveys: New 5 Year Cycle planned and implemented. 
Asset Management Planning - Appointment of external Asset Management
resource for next 6 months to develop Risk Optimised affordable asset
management planning. 
NetZero Carbon Interventions: Working with Climate Team to review and agree
2030 and 2038 targets. Supporting strategy review and revision workshops. 
ASG Engagement – All Associated school groups (ASG) completed. Mar 26 Elected
Members workshop on draft findings and options. Learning Estate Review Report to
ECLS Committee later this year. 
Page 189

Page 190

Page 190

Page 191

Report to: Corporate Committee  Meeting Date: 26 May 2026  
Report by: Executive Director Finance, Strategy and Transformation    
Author: Jon Matthews Contact
Email:
jon.matthews@moray.gov.uk 
Subject: Best Value Action Plan Progress Reporting 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  To note progress against the actions in the Best Value Action Plan.  
1.2  This report is submitted to Committee in terms of paragraph III B (7) of the Council’s
Scheme of Administration, monitoring the Council’s Best Value Action Plan.  
2.  SUMMARY  
2.1  The Council’s refreshed Best Value Action Plan was approved by the Corporate Committee
on 26 August 2025 and was last considered by Corporate Committee on 17 February 2026. 
The Action plan includes improvement actions taken from external audit
recommendations and internal self-assessment and elements of transformation. 
2.2  This report summarises the progress in relation to each of the seven Best Value themes
within the Action Plan.  
3.  RECOMMENDATIONS 
3.1  It is recommended that the Committee reviews and notes progress against the
actions in the Best Value Action Plan detailed in Appendix 1. 
Jon Matthews
Executive Director Finance, Strategy and Transformation 
Item 15.
Page 191

Page 192

4.  BACKGROUND AND CONTEXT  
4.1  Councils in Scotland have a statutory duty to demonstrate Best Value, introduced in the
Local Government (Scotland) Act 2003.  Statutory Guidance defines Best Value as:  
Ensuring that there is good governance and effective management of resources, with
a focus on continuous improvement, to deliver the best possible outcomes for the
public.  
4.2  In March 2020 the Scottish Government published refreshed Best Value guidance
requiring councils to demonstrate a focus on continuous improvement in performance
around seven themes: 
I. Vision and leadership
II. Governance and accountability
III. Effective use of resources
IV. Partnerships and collaborative working
V. Working with communities
VI. Sustainability
VII. Fairness and equality  
4.3  The Corporate Committee agreed a refreshed Best Value Action Plan on 26 August 2025
that set out the Council’s priorities for the next three years to enable it to meet its Best
Value duty (item 8 of the minute refers).  The Plan considers several actions from external
audit reports and from internal self-assessment and the Committee has agreed to receive
quarterly updates.  The last update was to Corporate Committee on 17 February 2026.  
4.4 The updated Best Value Action Plan, showing progress is attached as Appendix 1 to this
report. Progress can be summarised as follows: 
4.4 .1          Vision and Leadership: 
• Constructive summit with Community Planning Partners on the 2025
wildfires response. 
4.4.2           Governance and Accountability. 
• Work progressing on business continuity plans in readiness for end of
June’26 as per Feb’26 Committee approval.
• Significant activities completed across Cyber Resilience plans, with more
planned in next two quarters.
• Recruitment of leadership roles completed. 
4.4.3           Effective use of resources: 
• Reporting for transformation programme aligned with other Council
agendas and cadence. 
• Executive Director (Finance, Strategy & Transformation) recruited and in role.
Their remit will review further improvements to be made across the
transformation programme governance. 
• 2026/27 Balance budget set and clear assumptions made for capital
projects. Medium-Long term financial strategy incorporated transformation
project assumptions. 
Page 192

Page 193

4.4.4           Partnership and Collaborative Working:
• Progress has been limited in the quarter. However, two significant roles to
lead these initiatives have been recruited. They are the Executive Director of
Finance, Strategy & Transformation, and Head of People, Change and
Community Strategy. 
4.4.5           Sustainable development: 
• The climate change strategy is progressing with community engagement,
aligned with revised timeline set in Feb’26 Corporate Committee. 
• Funding has been secured for a Grampian region wide adaptation risk
assessment from Climate Ready Regions funding at Scottish Government.
Work is underway with Aberdeenshire and Aberdeen City Council under the
fund’s parameters. 
4.5 For the past two years the Council has carried out a joint Councillor/Officer Best Value
self-assessment with questions based on national guidance. The outcome of this
assessment has then fed into the actions in the Best Value Action Plan. 
4.6 Planning is underway (in collaboration with the Improvement Services organisation) for a
best value self-assessment workshop with councillors and the extended corporate
leadership team on the 28th of April. This will focus on continuous improvement across
the Best Value seven themes.    
5.  PROPOSALS  
5.1  It is proposed that the Committee considers and approve the refreshed Best Value Action
Plan in Appendix 1 and that the Public Sector Improvement Framework (PSIF) is used for
the corporate annual self-assessment from 2026 onwards.  
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) X 
Policy and Legal X 
Financial X 
Risk X 
Staffing  X
Best Value and Transformation X 
Property  X
Information Communications Technology/Digital             X
Equalities. Social Inclusion and Economic Impact              X
Climate Change and Biodiversity Impact X 
Page 193

Page 194

6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
The Best Value Action Plan supports the Council to deliver the priorities in the Corporate
Plan and supports the Council values of Improving: drive improvement; Ambitious:
ensure sustainable and efficient services; and Responsive: promote community
participation and involvement and involve our communities. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population   
6.3  Policy and Legal 
The Best Value Action Plan supports the Council to fulfil its statutory duty to demonstrate
Best Value, introduced in the Local Government (Scotland) Act 2003.  
6.4  Financial 
There are no specific financial implications, however, the Best Value Action Plan supports
the Council in its duty to make best use of resources and there are a number of specific
actions that relate to financial management that are moving forward. 
6.5  Risk 
There are risks associated with not making adequate progress on the actions set out in the
Best Value Action Plan. The Council has had feedback from a number of external
stakeholders that identified areas for improvement and failure to address these through
the planned actions is likely to lead to adverse reporting and implications for the Council. 
Several of the Best Value themes feature on the Council’s Corporate Risk Register
including leadership, financial sustainability and workforce development. Progressing the
actions in the Plan will also secure improvements in the management of these risks.  
6.6  Staffing 
There are no specific staffing implications arising from this report.  
6.7  Best Value and Transformation 
The implications are as set out in the report  
Page 194

Page 195

6.8  Property 
None.  
6.9  Information Communications/Technology/Digital 
None  
6.10  Equalities, Social Inclusion and Economic Impact 
This is covered in the Best Value inspection regime itself and the Council’s duty to deliver
best value.  
6.11  Climate Change and Biodiversity Impacts 
Sustainable development is a theme with the Best Value Action Plan 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with Extended Corporate Leadership Team
(ECLT) who have contributed to the action plan update set out in Appendix 1 and any
comments made have been incorporated into the report.  
8.  BACKGROUND PAPERS  
8.1  Corporate Committee report on Best Value Action plan 23 April 2024 (item 5a)
8.2  Corporate Committee report on 27 August 2024 Best Value Action Plan (item 11)
8.3  Corporate Committee report on 5 November 2024 Best Value Action Plan (item 8)
8.4  Corporate Committee report on 28 January 2025 Best Value Action Plan (item 7) 
8.5  Corporate Committee report on 10 June 2025 Best Value Action Plan (item 6)
8.6  Corporate Committee report on 28 August 2025 Best Value Action Plan (item 8)
8.7  Corporate Committee 4 November 2025 (Item 14 Report)
8.8  Corporate Committee 17 February 2026 (Item 11 Report) 
Page 195

Page 196

Best Value Action Plan 2025-2026: Progress Update                                                                                                                                                                        Appendix 1
1. Vision and
Leadership: Actions
Lead Start Date
End Date
%
Complete Current Position  Next Step Evidence
Log
Collaborative Leadership –
ensuring Members and
Officers work effectively to
secure key decisions 
1.1 Strengthen links to
strategic documents in
Committee reports
Head
of Gov
01/10/2025
31/03/2026 100 December 2025:  Additional guidance for authors
on how to complete the “Summary of Implications”
section has now been published by committee
services. Action complete 
Sept 2025: Discussion at CLT around need for
further guidance for authors on how to manage the
new report template and “Summary of
implications” section.
Risk remains static within Corporate Risk Register.  
July 2025: New Committee template in place with
ability to show links. Additional report drafting
guidance being considered on how to complete the
sections.
April 26: action complete. 
December 2025: Remove specific action
from plan 
Sept 2025: Committee Services working on
guidance aim to put revised guidance in
place by Dec 25. 
Updated
guidance
on
interchange
Community and Partner
Engagement on Council
priorities 
1.2 Working with
Community Planning
Partners (CPP) to
develop shared
engagement
CE /
ED
(FST)
01/07/24
30/06/26 85 March 2026: Wildfire Summit delivered jointly with
CPP to stakeholders. 
December 2025:  Shared work underway by CPP on
Poverty and Wildfire Summit. Discussions held in
respect of resourcing which will be progressed
further when new post holders start. 
Sept 2025: Online Moray Engage now active and
presentation/report was provided to CPP Board
meeting.  Update report on community engagement
drafted for consideration by CPOG. 
July 2025: Discussion held with Community
Engagement Group to reflect on the findings from
the CPB self-assessment undertaken with the
March 2026: Resourcing and working
arrangements to be progressed now Council
team in post. 
December 2025:  Progress two events and
agree resourcing and working arrangements. 
Sept 2025: CPOG to note community
engagement position 
Consider resourcing for community planning 
Page 196

Page 197

1. Vision and
Leadership: Actions
Lead Start Date
End Date
%
Complete Current Position  Next Step Evidence
Log
Improvement Service and consider how best to go
forward taking account of the recent experience
and report on community engagement within the
CPB.  It was noted that there had been significant
change in working practices over the years and that
there had been less value in the CEG as a result. 
Work is underway on a refreshed Community
Engagement Strategy for the CPB. The Council
online engagement tool will also be shared with
partners in August giving an opportunity for shared
engagement to be highlighted.
It is proposed that that date for finalising this work is
revised to take account of the challenges of
resourcing community planning, which are noted as
an area for consideration the planned review of
council structures.
Continuous Improvement
– implement self-
evaluation 
1.3 Consider and establish
service score cards to
provide overview to
develop and track
service improvement
corporately
Head
of
PC&CS
01/08/24
31/03/26 90 March 2026: EGD PSIF complete with improvement
actions agreed with HoS.  Finance checklist
analysis complete and planning around consensus
session underway.  Governance checklist being
prepared for circulation.  Evidence of common
organisational themes emerging and some
resistance around participation, reflected in
checklist returns, consensus session numbers. 
December 2025:  Programme progressing as
planned.  Improvements for HR/OD incorporated at
DMT level.  EGD PSIF process ongoing with
consensus to agree improvement plan scheduled
for January 26.  Finance to begin Jan 26.
Improvement actions are being recorded in
service/team plans rather that separate score
cards. With multiple PSIF processes complete,
March 2026: Corporate PSIF assessment for
Members and ECLT planned for April 2026. 
Outcomes from session to be reported to
Corporate Committee in Aug’26.   
December 2025: continue with programme.
Ensure it becomes a cyclical process.  Report
on initial findings to ECLT. 
Consider where best to capture actions and
whether Pentana (performance information
system) work meets Scorecard expectation.   
Page 197

Page 198

1. Vision and
Leadership: Actions
Lead Start Date
End Date
%
Complete Current Position  Next Step Evidence
Log
arrangements to track improvements corporately
can then be viewed and added to as subsequent
services complete PSIF processes. 
Sept 2025: HR/OD self-assessment complete.
Moray Engage in use for checklist, interchange page
created to hold introduction. EGD PSIF underway
and programme to July 2026 in place. 
July 2025: Use the HR /OD self-assessment
(currently underway) to consider how best to
capture actions to allow these to be tracked and
monitored. 
Page 198

Page 199

2. Governance and
Accountability: Actions
Lead
Start Date
End Date
%
Complete Current Position  Next Step Evidence
Log
Risk Management 
2.1 Business Continuity
Plans to be in place for
all critical services
Head
of Gov
28/03/24
30/06/26 [31/12/25] 90 March 2026:  Remaining services working towards
completed plans for the revised deadline 
December 2025:  Business continuity plans have
been prepared for 80% of services identified as
critical services. 
Sept 2025: Work is ongoing to refine the template
plan to services to tailor their response/mitigation
measure for a wider range of potential disruption
events.  This is a more sophisticated approach than
that previously adopted and should ensure better
resilience. 
July 2025: Critical services identified. Updating of
Business Continuity Plans is being progressed
alongside risk management practice and has regard
to complementary emergency planning
arrangements. Resilience levels can be affected by
change as identified in the latest update of the
Corporate Risk Register with issues including
financial constraints and reductions in staffing
impacting on capacity to maintain continuity of
services. Corporate support to ensure plans are
periodically updated to reflect the impact of change
will be on-going beyond the end date reported here.
March 2026: update position in June26 then
remove from BV action plan and move to
business as usual. 
December 2025: An extension of the
deadline until 30 June is sought to allow
remaining critical services to complete
business continuity plans using the
streamlined plan.   
Sept 2025: Finalise revised BC plan template
for Nov 25. 
July 2025: Progress on individual services BC
plans has not progressed as quickly as
anticipated due to finite central resource and
pressures on services to undertake their
assessments. Work will continue to refresh
Business Continuity Plans held within critical
services.  Although a date is specified, this
work should be a constant cycle of review. A
workshop with elected members to develop
a risk appetite statement is scheduled for
October 2025 and this will include
consideration of risks to business continuity
arising from operational change and the
extent to which these can be mitigated in the
current operating environment.     
Page 199

Page 200

2. Governance and
Accountability: Actions
Lead
Start Date
End Date
%
Complete Current Position  Next Step Evidence
Log
Risk Management 
2.2 Business impact
assessments
(resilience) completed
for all services.
Head
of Gov
28/03/24
30/04/26 100 Action Complete as per December note 
December 2025: 
• Critical services have been identified partly
as planned through business impact
assessment forms and partly from
experience from the Covid Pandemic. 
• Given limited resources for guiding remaining
services through the process, and the higher
priority of having plans in place for critical
services (Action 2.1) it is proposed that work
on business impact assessments for
remaining non-critical services is de-
prioritised and embedded in a rolling
programme which is monitored through CLT. 
Sept 2025: As below. 
July 2025: Critical services have been identified
through business impact assessment and Business
Continuity Plans are being developed for these
services. 
Action Complete as per December note 
December 2025: Treat as completed. 
Sept 2025: Process will be embedded as a
cyclical programme. 
Page 200

Page 201

Digital Resilience
Management 
2.3 Complete
implementation of
Cyber Resilience Plan
H/CE,
ICT&DS
28/03/24 
30/09/26 [31/12/25] 60 March 2026: NRS inspection Action Plan and
agreement to complete. Updates to cyber action plan
ongoing to include emerging priorities.  Completed
Scottish Government (SG) Cyber Resilience
Assessment (CRA) and awaiting bespoke actions
arising therefrom. Intermediate Phishing Awareness
module prepared and launched. Started preparations
for next phishing simulation. ITHC revised to include
requirements for Cyber Essentials. Restarted
discussions with Cyber and Fraud Centre Scotland
with a view to undertaking cyber incident response
exercise with ECLT in May. Reviewing the free tabletop
exercising (TTX Gym) from SG.  Downloaded most
recent versions of documents in the SG Cyber
Incident Response toolkit.  Attended supplier
webinars for the provision of a Security Operations
Centre (SOC) service following the dissolution of the
Digital Office procurement project. 
December 2025: Senior ICT officer appointed at the
end of Oct 25, which takes the Cyber Resilience and
Information Security team up to full
complement.  Review of tasks and priorities on action
plan started.  Cyber and Fraud Centre Scotland lined
up to do a desktop exercise for incident
response.  Phishing simulation completed in Nov 25.
Cyber awareness modules for 2026 provisionally
agreed.  Report prepared in response to the Accounts
Commission review of the cyber-attack experienced
by Comhairle nan Eilean Siar. 
Sept 2025: Recruitment and selection process has
taken longer than expected however, appointment of
remaining Senior ICT Officer post is imminent. The
consequential vacancy for the ICT Team Leader
(Server & Network Team) arising from the internal
appointment to cyber team has also been
delayed.  As a result, the ICT Team Leader (Cyber
Resilience and Information Security Team) has
primarily been focusing on the SWAN 2 project, which
March 2026: Finalise cyber action plan
including emerging priorities for 2026/27. 
Consider Areas to Improve from SG CRA and
add actions arising to the plan.  Review
training uptake and report back to CLT. 
Undertake phishing simulation.  Complete
cyber incident response exercise with CAFCS
and review outcomes. Complete ITHC and
prepare for PSN accreditation submission.
Review Cyber Incident Response Plan in line
with latest SG template, as well as most
recent versions of the playbook scenarios.
Assess options for the SOC service.     
December 2025: Update cyber action
plan.  Undertake desktop exercise once all of
the senior management posts are
filled.  Launch next training module
(intermediate Phishing) late Jan / early Feb
26.  Complete procurement for next IT Health
Check and penetration testing.
Request for Extension:  The action plan has
been reviewed by the new Head of Service for
Customer Experience, ICT and Digital. Due to
the number of outstanding actions that must
be completed before the plan can be
incorporated into business-as-usual activity,
we request that the end date for this item be
extended to 30 September 2026. 
Sept 2025: Catch up on work for cyber action
plan, the Information Security Policy, and the
desktop exercise for Incident
Response.  Undertake next phishing
simulation in October.  Finalise on security
awareness modules for 2026. 
July 2025: Complete recruitment and
selection process. Review and update Cyber
Resilience Action Plan with revised 
Page 201

Page 202

2. Governance and
Accountability: Actions
Lead
Start Date
End Date
%
Complete Current Position  Next Step Evidence
Log
is a key priority to provide additional bandwidth for
schools, and which has a deadline of December
2025.  Progress on the cyber action plan, the
Information Security Policy, and the desktop exercise
for Incident Response, has therefore been limited.
Cyber awareness training on Remote Working for
corporate staff, and Ransomware for teachers and
staff in schools has been undertaken. Going forward,
future training modules will be launched in January,
May, and September to avoid holiday periods.
A requirements specification has been drafted for the
procurement of external ICT security services.  There
is an expectation that all Councils will undertake
Cyber Essentials certification as well as the PSN
accreditation process. The requirements
specification needs to be adjusted accordingly before
running the competitive procurement exercise. 
July 2025: Cyber Resilience and Information Security
Team established. Recruitment for Senior ICT Officer
post in progress. Work progressing on ICT Information
Security Policy: target for final draft is Sep 25.
Supplier selected for testing of cyber incident
response plan.
Results from simulated phishing exercise showed an
improvement on baseline results.  Work in progress
for next simulation.  Next training modules launched
for cyber awareness.
PSN accreditation process complete.  Work has
started on procurement of supplier for next
submission.  Further penetration testing undertaken
for online services and work in progress for
penetration for employee self-service on HR / Payroll
system.
prioritisation and timescales to be able to
move to business as usual position and close
this action off.  Final draft of Information
Security Policy. Undertake desktop exercise
for Cyber Incident Response Planning. Define
work programme for 2025/25 cyber
awareness training. Award contract for IT
Health Check and Penetration testing.
Page 202

Page 203

2. Governance and
Accountability: Actions
Lead
Start Date
End Date
%
Complete Current Position  Next Step Evidence
Log
Digital Resilience
Management 
2.4 Complete Business
Continuity Plans/work
for corporate and
service cyber resilience
H/CE,
ICT&DS
28/03/24
30/09/26      
[31/03/26] 60 March 2026: Discussions with business Continuity
and Risk Manager ongoing.  Working with services to
review BC and Data Resilience processes.  Work on
Business Systems Review nearing completion – this
will pave the way for identifying the list of prioritised
information systems. Allocation of resource for
service BCP. 
December 2025: Newly appointed Senior ICT Officer
has started discussions with the corporate Business
Continuity and Risk Manager with regard to Business
Continuity Plans.
Sept 2025: As indicated in 2.3 above, there has been
limited resource available to progress this.
July 2025: Limited progress during Q1.  Priority for Q2.
Establishment of dedicated team will help to
progress this.
March 2026: Progress work on Business
Continuity plans. Complete Business
Systems review.  Progress service BCP. 
December 2025: Significant progress on
Business Continuity plans. Start work on
prioritised list of systems for Disaster
Recovery. 
Request for Extension: The current state of
business continuity plans across all services
is still being assessed by both Internal Audit
and ICT. It is anticipated that a clearer
understanding of the scale of work required
will emerge as this quarter progresses.
However, it is already evident that this action
will not be completed by 31 March 2026, and
it is therefore requested that the end date be
extended to 30 September 2026. 
Sept 2025: Draft final version of BC plan. 
July 2025: Draft final version of BC plan. 
Page 203

Page 204

2. Governance and
Accountability: Actions
Lead
Start Date
End Date
%
Complete Current Position  Next Step Evidence
Log
Management restructure     
2.5 Ensure the Council is
actively recruiting to the
vacant posts within the
management structure
and the plans are in
place should the
recruitment process be
unsuccessful. Ensure
constitutional
documents are
updated, interim
arrangements are in
place and post
implementation
evaluation is carried
out. 
CE
01/09/2025
31/03/2026 100 March 2026: Structure populated and postholders
started in post. Induction completed and work on
Leadership Development underway. 
December 2025:  Critical appointments have now
been made.  Constitutional documents have been
updated to reflect the revised structure.  PI’s relating
to the restructure have been agreed. 
Sept 2025: A number of vacant posts have been filled
however there are still significant gaps within the
directorate of Finance, Strategy and Transformation
and the post of permanent Chief Social Work Officer. 
CE has put interim arrangements in place for covering
vacant posts and report due to December full Council
to amend Scheme of Delegation. 
March 2026:  Key action complete. 
December 2025: remaining postholders have
still to take up posts. PI’s to be collected for
evaluation post-implementation. 
Sept 2025: Second round of recruitment with
revised advertisement focus is underway. 
Page 204

Page 205

3. Effective Use of
Resources: Actions Lead
Start Date
End Date
%
Complete Current Position  Next Step Evidence
Log
Page 205

Page 206

Transformation and
Sustainable Services 
3.1 Stage 3: Future
council programme
(normal business)
CE / ED
(FST)
01/08/24
28/08/26 70 March 2026: Executive Director for Finance, Strategy
and Transformation (ED FST) in role from mid Feb’26.
His role includes lead officer for the transformation
programme. Transformation Board met 24th March for
a review of each project. 
Councillor briefing session on 9th March which
provided greater visibility on the Moray Growth Deal
projects. 
December 2025: work continues to develop the
planned projects in the Transformation Strategy. 
Council on 3 December approved resources for the
improving attendance project; the Transformation
Board on 8 October noted the end of project report for
ASN and this is planned for committee early in 2026. 
The MGD early years stem facility is preparing for
opening with early access tours taking place in
December 2025. Progress also continues on the
learning estate projects with updates being presented
to ECLS committee in November 2025.   
Sept 2025: Council on 24/9/25 approved Stage 3 of
the Transformation Strategy and update set of
projects to support delivery of the strategy 
July 2025: The Council on 25 June 2025 agreed
reports on the Depot Review, Customer Services and
the way forward for the Out of Hours project. 
Workshops have been held with councillors/ECLT
(March) and the Leadership Forum for service
managers on 11 June 2025.  Work is underway to
review the outcomes and incorporate these into
Phase 3 of the Transformation Strategy for reporting
to Council in September
March 2026: Report to Corporate Committee
on 26th May, which will summarise overall
transformation programme, as well as
providing one-page summaries of each
project. 
December 2025: Initiation of Improving
Absence project
Progress project approvals for Regional
Renewable Funding project 
Sept 2025: Development of projects and 
new areas for consideration by
Transformation Board 
June 2025: report to Council in September on
Transformation Strategy
Smarter
working
phase 2
update
report to
council
4/12/2024
(item 19) 
Libraries
report
council
22/10/2024
(item 10 -
confidential) 
Review of
OOH report
22/10/2024
council
(Item 12 -
confidential) 
Corp cttee
update on
5/11/2024
(item 16) 
Accts
comm
overview
report 
Page 206

Page 207

3. Effective Use of
Resources: Actions Lead
Start Date
End Date
%
Complete Current Position  Next Step Evidence
Log
Transformation and
Sustainable Services 
3.2 Establish corporate
oversight to ensure
pace, prioritisation,
new opportunities,
ongoing development
and delivery of
benefits
CE / ED
(FST)
01/08/24
30/01/26 100 
December 2025: Reporting to the Transform Board
has been streamlined to provide better oversight and
alignment to Committee progress reporting which is
next scheduled for March 2026. Development work
now complete and governance operating effectively 
Sept 2025: Updated agenda and reporting format
prepared for Transformation Board to improve
oversight, tracking and consistency of reporting
format for committee. Council on 24/9/25 approved
Stage 3 of the Transformation Strategy and update set
of projects to support delivery of the strategy 
July 2025: Work is ongoing to prepare the next stage
of the Transformation Strategy.  This will include
oversight of the existing projects to ensure that
appropriate prioritisation is in place in relation to
alignment with council priorities and that target dates
are appropriate to ensure pace.  This will be reported
to the Council in September. 
Work on project governance has been initiated but
resource challenges make steady progress on this
difficult. 
December 2025: Progress reporting to March
Corporate committee
Now established way of working. 
Development work complete 
Page 207

Page 208

3. Effective Use of
Resources: Actions Lead
Start Date
End Date
%
Complete Current Position  Next Step Evidence
Log
Transformation and
Sustainable Services 
3.3 Build in engagement
with communities and
staff about the need
for change and impact
any mitigation of
proposed changes.
CE / ED
(FST)
01/08/24
30/01/26 100 December 2025: Information has been prepared
ready to support budget position in early 2026.  Moray
engage now being actively used for internal and
public engagement.  Community engagement is
established part of transformation approach (e.g.
learning estate, growth deal projects, leisure and
libraries as illustrations of approach) 
Sept 2025: Community engagement work continues
through the Moray Engage online engagement
platform. In addition, Leisure user groups have been
formed and initial meetings underway. 
July 2025: Community engagement work continues
as part of the Council's approach to ensuring local
needs and user perspectives are built into service
design and change.  2 public meetings have been
held for learning estate, library user groups are
established and meeting and leisure user groups are
being instigated. The procurement of the online
engagement tool is completed and implementation
work is well advanced with launch planned over the
summer 
December 2025: now established ways of
working.  Development work complete 
Sept 2025:  Leisure user groups to meet.
Continued promotion and use of the online
engagement tool. 
July 2025: Leisure user groups to be
established 
Online engagement tool to launch 
Transformation and
Sustainable Services
3.4 Annual reporting on
Transformation
Strategy and Moray
Growth Deal to be
aligned
Ref: BV Thematic Action 3
CE / ED
(FST)
01/09/25
31/03/2026 100 Action Complete as per December note 
December 2025: Improvements made to the
operation of the Transform Board and reporting to
committee will include aligning annual reporting. 
Sept 2025: Discussions are ongoing about aligning
reporting streams. 
Meantime transformation board updates are being re
formatted to show similar alignment. 
Action Complete as per December note 
December 2025:  As below. 
Sept 2025: Reporting will be aligned in 2026
and discussions between relevant officers
ongoing. 
BV
thematic
report Corp
cttee
26/08/25
Page 208

Page 209

3. Effective Use of
Resources: Actions Lead
Start Date
End Date
%
Complete Current Position  Next Step Evidence
Log
Transformation and
Sustainable Services
3.5 Review Transformation
Programme
Governance
Ref: BV Thematic Action 7 
CE / ED
(FST)
01/03/2026
30-09-26 
30/03/26 30 March 2026: Improvements implemented however
ED (FST) will review and consider any further
improvements required.
Updated Transformation Programme Committee
Paper being presented to May’s meeting. 
December 2025: Improvements made to the
operation of the Transform Board and reporting to
committee.  Project development and monitoring is
operating effectively within these governance
arrangements.  Work has been delayed due to
vacancies in the management structure. Policy and
procedure document review remains to be actioned
Sept 2025: A light touch review has been completed
with a substantive review postponed until
recruitment to the Head of People, Change and
Community Strategy is completed 
March 2026:  ED(FST) reviewing programme
governance 
December 2025: Policy and procedure
document review
Extension of timescale to Sept 2026
requested 
BV
Thematic
report Corp
cttee
26/08/25 
Page 209

Page 210

3. Effective Use of
Resources: Actions Lead
Start Date
End Date
%
Complete Current Position  Next Step Evidence
Log
Financial Management 
3.6  The Council will
strengthen monitoring
of the delivery of the
Capital Plan and take
action to address any
slippage. Ongoing
quarterly. 
CFO
01/07/24
31/03/2026 75 March 2026: Q3 Capital Monitoring (reported to CC
17 Feb 2026) Estimated full year outturn of 65%
Capital Plan delivery. Full year spend figures expected
~20 April and to be reported to Council June 2026. 
December 2025: Revised RAG introduced to highlight
deviation from target spend. 
Sept 2025: Q1 report introduced a target spend of
90% of budget to date – slippage of over 10% in any
asset class will be reported to Corporate Committee
for individual scrutiny 
July 2025: Out-turn for 2024/25 (reported June 2025)
shows a significant decrease in slippage from
previous years - 90% compared to 71% completion in
2023/24
Capital budget managers are being challenged to
develop more detailed timelines for their projects to
improve forward planning. 
December 2025: Draft capital budget for 2026
onwards prepared 
March 2026: Q4 report June 2026. 
December 2025: Q3 report February 2026
October to December 2025: Review of
capital plan 2026 to 2029 including detailed
phasing review
December 2025: 3 year plan and 10 year
indicative plan to be drafted and reported to
Council January 2026
Officers use
only:
Guidance
for Budget
Monitoring
to
Committee 
Capital Plan
2024/2025
04/12/2024 
Q1 capital
report to
Corporate
Committee
26 August
2025 
Q2 capital
report to
Council 3
December
2025 
3.7 Ensure capital budget
set in advance is
realistic, reducing the
need for significant
budget amendments in
the first months of the
financial year. 
CFO
01/09/2025
28/02/26 100 March 2026: Budget for 2026/27 set using realistic
assumptions. It is noted that these assumptions rely
on key tool-gates being reached across both funding
and project activity, which if not met, will lead to
budget variances.  
March 2026: Progress versus budget will be
completed as part of core Council financial
reporting. 
Page 210

Page 211

3. Effective Use of
Resources: Actions Lead
Start Date
End Date
%
Complete Current Position  Next Step Evidence
Log
Financial Management  
3.8 Next iteration of
Medium to Long
Term Financial
Strategy to be
updated to
explicitly include
link with
Transformation
Strategy and
reducing budget
gap and
Transformation as
drivers
Ref: BV Thematic
Action 2
CFO
01/01/26
28/02/26 100 March 2026: Complete. Presented to Special
Meeting of Moray Council 25 Feb 2026. 
December 2025: work on update underway 
Sept 2025: Update planned for February 2026 to meet
timescale for 2026/27 budget.
March 2026: Complete. No further action. 
December 2025: report to council February
2026 
Sept 2025: Commence update including link
with latest transformation Strategy update.
BV
thematic
report Corp
cttee
26/08/25 
Page 211

Page 212

4. Partnership and
Collaborative Working:
Actions Lead
Start Date
End Date
%
Complete Current Position  Next Step Evidence
Log
Page 212

Page 213

Partnership Working for
Moray 
4.1 Work with Community
Planning Partners
(CPP) to develop
shared priorities for
incorporation into
Local Outcome
Improvement Plan
(LOIP)
CE/ ED
(FST)
28/03/24
31/10/26 35 March 2026: The Head of People, Change and
Community Strategy has begun engagement with CPP
partners to better understand where there may be gaps
in shared working and alignment across partners.
Building on this, a session is planned for the April
officer meeting to discuss how partners will develop an
engagement plan in preparation of the next iteration of
the Local Outcome Improvement Plan (LOIP). This will
focus on gathering robust evidence of need and
ensuring that future priorities are shaped
collaboratively and reflect the collective insight of
partners and communities. 
December 2025: Shared work underway by CPP on
Poverty and Wildfire Summit. Discussions held in
respect of resourcing which will be progressed further
when new senior post holders start. Work will then
focus on developing shared priorities for incorporation
into a new LOIP. 
Sept 2025: Changes in senior representation at CPOG /
CPB have delayed the ability to progress the
development of new LOIP.  CPP sessions to be
planned. 
Dec 2024:  The most recent development session on
24/10 considered opportunities to further develop
community engagement in the delivery of priorities. 
Development sessions been held with community
planning partners to consider priorities and how can
take forward collectively.  Agreement reached on focus
and main priorities for LOIP. This will inform the
updating of the LOIP and development of approach to
delivery
March 2026:  Work to be progressed and
timeline developed. 
December 2025: As below following new
post holders taking up roles. 
Sept 2025: Plan and undertake CPOG / CPB
session to identify and agree process and
resource to progress work. 
Partnership Working for
Moray 
4.2 Investigate and
develop potential
single Moray Plan 
CE /
ED
(FST)
28/03/24
31/10/26 12 March 2026:  No further work has been developed on a
single plan following the new Moray Council Corporate
Plan, published in 2024. As engagement begins on the
new iteration of the LOIP, work will be carried out to
better align the plans with the aim to move to a single
Moray plan in future years.
March 2026:  Work to be progressed and
timeline developed. 
December 2025: As below following new
post holders taking up roles. 
Page 213

Page 214

4. Partnership and
Collaborative Working:
Actions Lead
Start Date
End Date
%
Complete Current Position  Next Step Evidence
Log 
December 2025:  As below and will commence
following new post holders taking up roles. 
Sept 2025: Changes in senior representation at CPOG /
CPB have delayed the ability to progress the
development of new LOIP and consideration of a
potential single Moray Plan.  CPP sessions to be
planned. 
Nov 2024: Research completed of other councils
established that 2 have single plans (noted below). 
Discussion taken place with Improvement Service for
support on this area.  Potential for IS to undertake
element of work if funded.
This has been raised at the development sessions with
the CP Board and there has been general support for
the approach.  To be considered further as the LOIP is
re-developed.  Currently 2 of 13 family group
authorities have a single plan, Midlothian and Fife.
Clackmannanshire also have a variation which is being
looked at.
Sept 2025: Plan and undertake CPOG / CPB
session to identify and agree process and
resource to progress work. 
Page 214

Page 215

4. Partnership and
Collaborative Working:
Actions Lead
Start Date
End Date
%
Complete Current Position  Next Step Evidence
Log
Partnership Working for
Moray 
4.3 Identify opportunities
to maximise the
impact of resources
and budgets through
alignment of activity. 
CE /
ED
(FST)
28/03/24
31/10/26 10 March 2026: 
As per note below – work underway for Health and
Social Care. 
December 2025: Discussions are ongoing to identity
areas of either shared services or delivering ‘once for
Grampian’ 
Sept 2025: Early discussions have commenced with
partners to identify areas to align activity – e.g. at Chief
Officers Group, MIJB, NHS Grampian, Improvement
Service 
Dec 2024:   There has been work to identify partner
resources to support this action and it is hoped this
can be advanced in the first quarter of 2025
Nov 24: meeting taken place with partners re locality
work.  Identified scope for development and this will be
taken forward                                                
March 2026:  Progress H&SC work. Newly
recruited Executive Director for Finance,
Strategy & Transformation reviewing
opportunities for creating efficiency and
effectiveness from partnership approach,
starting with their direct corporate service
remit (e.g. procurement). 
December 2025: As below – areas suited to
this approach to be identified and explored. 
Sept 2025: Continue discussions to identify
and agree process and resource to progress
work. 
Page 215

Page 216

4. Partnership and
Collaborative Working:
Actions Lead
Start Date
End Date
%
Complete Current Position  Next Step Evidence
Log
Partnership Working for
Moray 
4.4 Continue
development and
delivery of Locality
Plans, involving
service users and
local communities in
the design of services
CE /
ED
(FST)
28/03/24
30/10/25  100 December 2025: Continuing as established work. 
Sept 2025: The work on development of Locality Plans
for the areas agreed by the Council and CPP is well
developed and will be ongoing work.   
April 2025: The work on development of Locality Plans
for the areas agreed by the Council and CPP is well
developed and will be ongoing work.   The Council is
also considering how to secure community influence
on services and priorities through the next stage of its
community engagement approach.                                                                                                                                        
MIJB is currently undertaking work in relation to
children and HSCM locality models in specific locality
areas over the next few months and officers will aim to
build on this from a partnership perspective to connect
more directly with a Moray wide CPP approach..  This
work is noted as 75% complete as the final stages are
to be refined by the CPP.   
No further development work - complete 
Page 216

Page 217

5. Sustainable
Development: Actions Lead
Start Date
End Date
%
Complete Current Position  Next Step Evidence Log
Sustainable
Development 
Identify any gaps that
require consideration and
action.
ED
EEO
8/03/24
30/11/26 [31/03/26] 70 March 2026: The area wide climate change strategy is
progressing with the information gathered in from the
community workshop analysed and organised into
themes. This is being supplemented by directly
engaging with additional businesses and organisations
identified at the workshop and gathering in additional
information around the themes through wider
community engagement. Moray CAN is progressing
how to present the strategy as an online accessible
resource rather than a static document. 
Funding has been secured for a Grampian region wide
adaptation risk assessment from Climate Ready
Regions funding at Scottish Government. This is a
partnership of Moray, Aberdeen and Aberdeenshire
Councils with Aberdeen City Council being the lead
organisation for the grant. Within the climate risk
assessment, council specific annexes for each council
area will be developed to ensure internal relevance,
alignment with local strategies and
ease of communication with communities and
partners. This will be used to supplement the area wide
climate change strategy. 
Community views have been gathered on the revised
Moray Council Climate Change Strategy. There were no
changes to the sustainable development section. 
March 2026: Timeline for the area
climate change strategy is in draft and
will be available ahead of the November
meeting of Corporate Services
Committee, the Moray CAN annual
gathering (October), and the
Community Planning Partnership,
before going out for wider community
consultation through Moray Engage. 
Grampian region wide adaptation risk
assessment to go out to tender and
work to be completed during financial
year 2026-27 in line with grant
conditions. 
Final version of the revised Moray
Council Climate Change Strategy to be
presented to the May Full Council. 
Climate Change
Strategy/updated
Routemap to Net
Zero - ED & I
10/03/2026 (item
13) 
Local Heat and
Energy Efficiency
Strategy (LHEES)
Update 2026 ED
& I 10/03/2026
(item 14)
v
Page 217

Page 218

December 2025: The MEP subgroup has met again and
discussed the community involvement around the
socio-economic benefits of renewable energy and
infrastructure upgrades.  The Council’s Climate
Strategy which will embed sustainable development is
out for consultation. 
Officers and Moray CAN are meantime progressing the
area wide climate change strategy and have held a
community workshop to gather information. However
additional community engagement is required, Moray
CAN have been unable to prioritise this for the
December deadline but now have funding for 2026/27
and can programme this activity. 
December 2025: The MEP subgroup is
reporting up to MEP the issues around
the infrastructure upgrades. 
The area wide climate change strategy
has taken longer due to partnership
working. Moray CAN will now
programme in additional community
engagement activity. In addition, shared
work on adaptation is being investigated
which would be invaluable in framing
the Regional CSS.
Based on these discussions a further
extension is sought to November 2026
for two elements of actioning gaps,
broken down as follows:
• Scope out partnership interest
in shared sustainable
development priorities/actions
in the LOIP Review – this aspect
will be taken forward in an area
wide Climate Change Strategy
which is taking longer than
anticipated due to partnership
working, but a draft for
consultation is anticipated to
be available ahead of the
November meeting of
Corporate Services Committee
• Consider and Embed
Community views on
sustainable development in the
revised Climate Change
Strategy – this has been done at
a level appropriate for the
Council’s own strategy, with
reporting of the final strategy to
be done before the end of June
2026 at the latest. 
Climate Change
Strategy - FC
24/9/2025 (item
10) 
Climate Change
Plan & Route to
Net Zero - FC
27/8/2025 (item
12) 
Climate Change
Overview - CPB
03/12/2024 (item
2) 
Climate Change
Strategy /
updated
Routemap to Net
Zero - FC
4/12/2024 (item
15) 
Page 218

Page 219

5. Sustainable
Development: Actions Lead
Start Date
End Date
%
Complete Current Position  Next Step Evidence Log      
Sept 2025: The MEP subgroup has met twice and
agreed a focus on climate change including
sustainable development alongside other areas. Talks
with Moray CAN and others on an area wide climate
strategy are progressing. 
July 2025: An initial meeting of the MEP Subgroup
covering this activity has been held. Later actions are
progressing in line with deadlines in Action Plan. 
Sept 2025: The MEP subgroup needs to
identify shared priorities with work
plans allied to these. Work on the Area
wide strategy can now proceed apace
following on opening of consultation on
the draft Climate Change Strategy and
as Moray CAN have now held their
annual conference on 3.10.25.  There is
a need to extend the end date for this
work to reflect availability of
partnership resources and this is
sought to 31.3.26. 
July 2025: Work planning in MEP
subgroup to begin in August meeting.
Work on the Climate Change Strategy
update incorporating sustainable
development is progressing with a
report to council in September. The area
wide Climate Change Strategy work will
build on the Moray Climate Action
Network Annual Conference being held
at the start of October.   
Page 219

Page 220

Page 220

Page 221

Report to: Corporate Committee Meeting Date: 26 May 2026  
Report by: Executive Director Economy, Enterprise and Operations      
Author: Atholl Scott Contact Email: atholl.scott@moray.gov.uk 
Subject: Risk Appetite Statement 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to seek approval of a Risk Appetite Statement, developed
following a briefing and workshop session held with councillors and senior managers in
attendance. The statement will provide a point of reference when considering risk as part
of the decision-making processes of the Council and its committees.  
1.2  This report is submitted to Committee in terms of Section III (B) (36) of the Council’s
Scheme of Administration relating to council wide or corporate risk assessment and the
mitigation and management of these risks.  
2.  SUMMARY  
2.1  Good governance practice within local government requires the effective management of
risk. Currently the Council has the following mechanisms in place to manage risk: 
• A Risk Management Policy and guidance.
• Strategic and service/project specific risk registers 
• Consideration of risk implications in committee reports   
2.2  The Council’s Corporate Risk Register (CRR) describes the strategic risks the council faces
and how these risks are being managed. The Council currently reviews its CRR on a
quarterly basis and the latest iteration, dated April 2026, is provided as a separate item on
the agenda of this committee meeting. 
2.3  Whilst the CRR references the concept of risk appetite, national guidance suggests that
the Council should also have in place an overarching Risk Appetite Statement.   
2.4  A briefing and workshop was held with Councillors and the Corporate Leadership Team on
29 October 2025 at which views were gathered on the level of risk appetite that might be
acceptable for the Council across eight strategic risk categories aligned to the Corporate
Risk Register. 
Item 16.
Page 221

Page 222

2.5  Following evaluation of the workshop session a draft Risk Appetite Statement has been
prepared and is provided as Appendix 1 for approval.  
3.  RECOMMENDATION  
3.1  It is recommended that Committee: 
i) considers and approves the draft Risk Appetite Statement provided as Appendix
1 to this report; and   
ii) agrees that the Risk Appetite Statement  be added to report writing guidance as
a source of reference for Officers drafting committee reports.   
Atholl Scott
Business Continuity/Risk Management Officer 
4.  BACKGROUND AND CONTEXT  
4.1 
4.2 
Risk appetite is defined as the level of risk an organisation is willing to accept in pursuit of
its strategic objectives. The Corporate Risk Register (CRR) references the appetite for risk
under high level risk themes. Appetite levels vary, for some risk themes the overall risk
exposure needs to be minimised, for others, there is greater openness to higher levels of
risk. Higher levels of risk are appropriate where there is agreement that such risk levels are
both proportionate and necessary in pursuit of the council’s established objectives and
priorities. 
Risk appetite informs decisions we all make as individuals; for example, in relation to
participation in extreme sports, some will be averse to taking part, others will be willing or
eager to do so. Similarly, savers with a lower risk appetite may opt for the security and
fixed returns from bank deposits; others with a higher risk appetite may pursue potentially
greater returns from other investments. Risk management in the council has added
complexity but the broad principles around determining risk appetite are similar.  
4.3 Traditionally Councils, with responsibility for public funds, have been seen to be risk
averse, however, there is now broad acceptance that informed and managed risk taking is
both appropriate and necessary to support delivery of Best Value. Risk appetite will vary
depending on circumstances presenting, as such there is a need to give consideration to
risk appetite levels from time to time, having regard to known wider external influences
and to both strategic and operational challenges within the council.
Page 222

Page 223

4.4 
4.5 
4.6 
4.7 
4.8 
4.9 
4.10 
The levels of risk appetite can be described on a continuum as follows: 
Low risk - Willing to accept only little or no risk Lowest risk appetite
Low to Moderate risk- Willing to accept a low amount of
risk 
Moderate risk - Willing to accept a medium amount of
risk 
Moderate to High risk - Willing to accept a higher
amount of risk 
High risk - Willing to accept a high level of risk Highest risk appetite 
It is important that all relevant factors are considered when determining the approach to
be taken. In most instances the council will have to consider an aggregate of several or
sometimes multiple risk issues as part of its decision-making processes. Consideration of
risk appetite is not new, and the council, through established governance arrangements,
routinely considers the impact of risk when determining policy priorities and outcomes. 
There may also be instances where risk appetite is exceeded, requiring risks to either be
tolerated or actions taken in further mitigation. Illustrative recent examples include roads
maintenance plans for the current year, where a deterioration of roads condition exceeded
appetite - but has been tolerated given the council’s relative position compared with other
Scottish councils and financial constraints; and absence management data which
detailed that both appetite and tolerance levels had been exceeded and required further
targeted interventions. 
A briefing/ workshop session was held with councillors and the Extended Corporate
Leadership Team on 29 October 2025  to reflect on risk appetite across eight strategic risk
categories aligned to those in the Corporate Risk Register. The discussion and debate was
extensive with multiple viewpoints expressed. Workshop participants recognised that
determining risk appetite in any given set of circumstances can be both complex and
challenging.   
Consideration was given at the workshop to: 
• Aligning levels of risk appetite to strategic objectives 
• Using risk appetite to support decision making consistent with sound management
of public resources.
• Levels of risk tolerance- the level of variation from the Council’s ideal risk appetite
position that is acceptable before action or escalation is required. 
Outcomes from the workshop discussions are summarised  below  The draft risk appetite
statement expands on this information and is provided as Appendix 1. 
Strategic Governance and Leadership -Risk Appetite – Moderate to High
Effective strategic governance and leadership has been recognised as key to delivery of
Best Value, and consideration of risk is a necessary element of strategic decision making
to optimise delivery of services to the Moray community. 
Legal and Regulatory Compliance – Risk Appetite - Low 
Page 223

Page 224

4.11 
4.12 
4.13 
4.14 
4.15 
4.16 
4.17 
There is acknowledgement of the importance of the regulatory framework the council
operates by, and of the need for compliance with laws or regulations. 
Financial and Resource Management- Risk Appetite - Moderate
There is consensus that appropriate and effective financial controls must  be maintained
but this does not preclude innovative action  to ensure services are sustainable and can
be preserved so far as is practicable. 
Workforce and Organisational Capacity -Risk Appetite -Low to Moderate 
With staff being the council’s most important resource there is a commitment  to
improving  organisational culture in areas including communications and staff
engagement and  promoting opportunities that  encourage applications for vacant posts. 
Operational Service and Performance – Risk Appetite – Moderate to High
The challenge of maintaining operational service and performance standards has been
recognised and there is an appetite to pursue opportunities for change in circumstances 
where tangible improvements are assessed as achievable.. 
Digital, Information Governance and Technology- Risk Appetite -Low to Moderate
The council is averse to any occurrences that may result in loss, theft, or unauthorised
access to information that it holds, while embracing an appetite for sustainable, well
thought through digital transformation. 
Reputational- Risk Appetite - Low
The The council l seeks to mitigate risks that may impact on its reputation , acknowledging
that a higher level of risk may present where agreed council decisions seen as necessary
prove unpopular. 
Environmental and Climate  - Risk Appetite -High
The appetite for addressing environmental risk is already evidentwith multiple measures 
taken to mitigate the effects of climate change and further plans in train to maintain
momentum as financial resources allow. 
5.  PROPOSALS 
5.1  Adoption of a risk appetite statement affirms and guides how risk is being managed within
the organisation as a contribution to delivery of best value services and in line with good
governance practice. 
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) X 
Policy and Legal X 
Financial  X
Risk X 
Staffing  X
Page 224

Page 225

Best Value and Transformation X 
Property  X
Information Communications Technology/Digital                 X
Equalities. Social Inclusion and Economic Impact   X
Climate Change and Biodiversity Impact  X 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Aligning risk management to  Corporate Plan priorities will better enable the Council to
fulfil the ambitions set out in its strategic plans.   
6.3  Policy and Legal 
In line with good governance arrangements promoted by the Chartered Institute of Public
Finance and Accountancy and the Society of Local Authority Chief Executives, the council
is committed to the effective management of risk. The development of a Risk Appetite
Statement supports this commitment. 
6.4  Financial 
Whilst there are no financial implications arising directly from this report, defining the
Council’s appetite for financial risk will assist with sound financial management. 
6.5  Risk 
This report seeks approval of a Risk Appetite Statement that will assist the council to
determine the level of risk it is willing to take to deliver best value services and meet its
corporate objectives. 
6.6  Staffing 
There are no implications.  
6.7  Best Value and Transformation 
Having well developed risk management processes will assist the Council in the effective
use of resources.  
6.8  Property 
There are no implications.  
6.9  Information Communications/Technology/Digital 
There are no implications. 
6.10  Equalities, Social Inclusion and Economic Impact  
Whilst there are no direct implications, defining risk appetite can assist  in  identifying
areas for prioritisation.  
6.11  Climate Change and Biodiversity Impacts 
Whilst there are no direct implications, defining risk appetite can assist in identifying areas
for prioritisation.    
7.  CONSULTATION  
Page 225

Page 226

7.1  This report together with the draft Risk Appetite Statement has been prepared following a
briefing/workshop with Councillors and the Corporate Leadership Team. The workshop
acknowledged the importance of effectively managing risk as a key element of the
council’s decision-making processes. This led to the development of the risk appetite
statement which sets indicative levels of risk the council would be willing to accept that
deliver the optimal outcomes for service users and the wider Moray community. 
8.  BACKGROUND PAPERS  
8.1  None.   
Page 226

Page 227

Appendix 1
Moray Council - Risk Appetite Statement 
1. Introduction
This Risk Appetite Statement defines Moray Council’s approach to risk-taking across its
strategic and operational activities. It supports informed decision-making and ensures
alignment with the Council’s values, strategic objectives, and statutory obligations.
The Council adopts a balanced approach to risk-taking, acknowledging that
transformation, innovation and service improvement often require managed risk-taking
to ensure optimal use of available public funds and resources.
2. Risk Appetite Levels and Definitions
For the purposes of determining the appetite for risk taking in any decision-making
processes the council has adopted the risk appetite levels and definitions detailed
below:
Risk Appetite Levels
Low - Willing to accept only little or no risk Lowest risk
appetite
Low to moderate - Willing to accept a low amount of
risk 
Moderate- Willing to accept a low to medium amount
of risk 
Moderate to High - Willing to accept a medium
amount of risk 
High- Willing to accept a higher level of risk Highest risk
appetite 
Risk Definitions 
Low
Definition: Avoids risk wherever possible. Only accepts risks that are essential to
statutory compliance or legal obligations. Prefers certainty and control.
Low to Moderate
Definition: Accepts minimal risk only when necessary to deliver core services. Strong
preference for conservative approaches and proven methods. Risk-taking is rare and
tightly controlled.
Moderate
Definition: Willing to accept limited risk to improve efficiency or effectiveness, provided
robust controls are in place. Prefers incremental change and tested solutions.
Page 227

Page 228

Moderate to High
Definition: Prepared to take measured risks to innovate, transform services, or achieve
strategic objectives. Accepts that some initiatives may fail if the potential benefits
justify risk taking.
High
Definition: Actively seeks opportunities that involve significant risk where the potential
for transformational impact is high. Encourages bold decisions and experimentation
within governance boundaries.  
3. Corporate Risk Register 
Consideration of what might be an acceptable level of risk taking on a scale from low to
moderate to high across each of the eight risk themes in the Corporate Risk Register has
been informed by a workshop involving senior leaders (councillors and chief officers). The
workshop established that a range of risk appetites can exist within an individual risk
theme; the risk appetite determined in aggregate for each theme is as follows: 
Strategic Governance and Leadership – Risk Appetite – Moderate to High 
• The council is willing to take high risks where these are likely to contribute to the
successful delivery of its high-level corporate plans. 
• The council is accepting of moderate to high risks linked to collaborative working
with partners where tangible community benefits are assessed as likely to be
achieved. 
• Senior leaders have low appetite for taking risks that would breach standards of
conduct protocols. 
Legal and Regulatory – Risk Appetite - Low   
• There is acknowledgement of the importance of the regulatory framework the
council operates by, and it has a low appetite for taking risks that breach laws or
regulations. 
• Capacity issues can bring challenges in ensuring full compliance across all policy
areas; the council consequently has a moderate approach to such risks to mitigate
against complaints and/or litigation. 
Financial and Resource Management – Risk Appetite - Moderate 
• The council has a low appetite for any risks that would result in financial failure.
• A moderate to high appetite for risk nevertheless contributes to responsible use of
financial resources and ensure services can be preserved or enhanced so far as is
practicable. 
• There is a moderate approach to borrowing and investment in line with treasury
management protocols covering borrowing and investment.
Page 228

Page 229

• A low to moderate risk approach is adopted in respect of internal control systems to
limit adverse findings from internal and external audit processes. 
Workforce and Organisational Capacity – Risk Appetite – Low to Moderate 
• The council has a low risk appetite for recruitment of persons without requisite skills
but accepts moderate to high risk taking that promotes opportunities that
encourage applications for vacant posts, and similarly to taking risks that promote
organisational development. 
• The council has a high risk appetite for improving organisational culture, in areas
including communications and staff engagement.
• There is a low to moderate appetite for risks that impact staff support and welfare
arrangements, and a low risk approach in all matters relating to the health and
safety of the workforce. 
Operational Service and Performance – Risk Appetite – Moderate to High 
• There is a moderate appetite for risk in relation to change affecting buildings, plant
and infrastructure – this approach being taken having regard to multiple factors
including costs, public opinion, and service demands. 
• A high risk approach can be applied where tangible service improvements are
identified, with some short-term disruption acceptable where longer term benefits
are considered achievable. 
Digital, Information Governance and Technology – Risk Appetite – Low to Moderate 
• The council has a low risk appetite for any actions that may result in loss, theft or
unauthorised access to information that it holds.
• It has a moderate appetite for progressing development of technical solutions to
replace paper-based systems, mindful of the impact on service users who may feel
excluded and the need for proper migration of data.
• There is a moderate to high risk appetite for sustainable well thought through digital
transformation. 
Reputational Risk – Risk Appetite - Low 
• The appetite for reputational risk is low with the council looking to act in the best
interests of the Moray community and its citizens.
• Decision making is conducted in an open and transparent way including integrated
impact assessments and engagement and consultation processes, where
appropriate, to minimize reputational risk impacts. 
• It is acknowledged that a high level of risk may be evident where agreed council
decisions, seen as necessary, prove unpopular. 
Environmental and Climate – Risk Appetite - High 
• The appetite for addressing environmental risk is high albeit with the limiting factor
of financial constraints. 
Page 229

Page 230

• The council has progressed energy efficiency measures on multiple fronts and has a
moderate to high appetite for further measures that have positive impacts on
energy use.
• With its declaration of a climate and nature emergency the council has a high
appetite to pursue adaptation measures in a sustainable, affordable, and
proportionate manner.
• The risk appetite for procurement is moderate given the regulatory framework that
applies nationally, with the council supportive of local procurement opportunities
and community wealth building where possible. 
4. Governance and Review 
This first Risk Appetite Statement provides examples of risk implications that typically
require to be considered by the council and its committees, and has been prepared as an
aid to strategic decision/policy making. The Risk Appetite Statement will be subject to
review after one year to assess its impact on corporate risk management practice. 
April 2026   
Page 230

Page 231

Report to: Corporate Committee Meeting Date: 26 May 2026  
Report by: Executive Director Economy, Enterprise and Operations  
Author: Atholl Scott Contact Email:  atholl.scott@moray.gov.uk 
Subject: Corporate Risk Register – April 2026 update 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to provide the Committee with the latest updated version of
the council’s Corporate Risk Register.  
1.2  This report is submitted to Committee in terms of Section III (B) (36) of the council’s
Scheme of Administration relating to council wide or corporate risk assessment and the
mitigation and management of these risks.  
2.  SUMMARY  
2.1 A key element of good governance is the effective management of risk. Risk is routinely
managed in many forms in the delivery of council services, and specific risk issues are
considered in all reports requiring a decision that are submitted to council or its
committees. 
2.2 The updating of the Corporate Risk Register provides the opportunity for senior leaders to
reflect on the principal risks affecting the organisation, to consider how these risks are
being managed, and to provide assurance that the measures in place to mitigate them
remain both appropriate and proportionate. 
3.  RECOMMENDATIONS 
3.1  It is recommended that Committee consider and approve the updated Corporate Risk
Register dated April 2026 attached as Appendix 1 to this report. 
Atholl Scott
Business Continuity/Risk Management Officer 
4.  BACKGROUND AND CONTEXT  
4.1  Managing risk is a continuous process necessary to ensure that appropriate governance
standards are met in the use of public money and in the delivery of council priorities. Risk
Item 17.
Page 231

Page 232

informs day to day decisions at all levels of the organisation. The council has a risk
management policy and guidance to aid its risk management practice. This includes a
requirement for the periodic consideration of an updated Corporate Risk Register
summarising the principal risks facing the council. 
4.2  This Committee last considered the full Corporate Risk Register at its meeting on 4
November 2025 (paragraph 15 of the minute refers). The principal risks facing the council
together with the actions being taken or planned to mitigate them were approved.
Committee also noted, following a workshop on risk appetite on 29 October 2025, that
plans were in train to simplify the form and content of the Register. This will take effect
from the next update, subject to approval of the draft Risk Appetite Statement provided for
consideration as a separate item on this agenda. 
4.3 
4.4 
Of the nine risk areas described in the risk register provided in Appendix 1, the residual
risk scores have been reviewed to take account of recent policy and practice
developments and improvements. Notwithstanding this, the risk scores in seven of the
nine risk categories remain unchanged, with residual risks relative to Finance reduced
because of sustained changes made to how available financial resources both capital and
revenue are managed, and in relation to HR(People) where Phase 1 changes to senior
management structures have been completed, and enhanced procedures put in place to
address higher staff absence in some services. 
A brief overview of outcomes from the CRR review is as follows: (scoring based on a
likelihood x impact matrix- maximum score 5 x 5 =25)   
Risk Issue Risk Score
(Likelihood x Impact)
Commentary 
Collaborative
Leadership
3x4 =12
No change 
Good progress towards achieving Best Value
outcomes achieved. Senior management roles
now filled. Score may be subject to further
review when outcomes of current elected
member survey are known. 
Financial 4x4 =16 
(was previously
5x4 =20) 
Risk reduced
Balanced budget achieved for 2026/27 and close
monitoring of both Capital and Revenue spend
being undertaken. Current operating
environment indicates risk must remain high
albeit at a slightly reduced level since the last
update. 
HR (People) 4x4 =16 
(was previously
5x4=20) 
Risk reduced
Recruitment challenges remain within some
services and higher levels of staff absence has
been identified as an issue. Actions are being
progressed to address these allowing the risk
score to be reduced. 
Risk Issue Risk Score
(Likelihood x Impact)
Commentary
Page 232

Page 233

Regulatory  3x3 = 9
No change 
This previously had a ‘neutral’ scoring
recognising pressures from new duties that can
occur. Council has established procedures in
place to address emerging issues corporately
and within services and continues to monitor
same -no change to the risk score proposed.
Environmental 3 x2 = 6
No change
This risk as at September 2025 attracted a lower
score in recognition of the multiple actions being
undertaken by the council to mitigate against
climate change and damage to the environment
Work continues to address impacts in this area,
enabling the risk score from a council
perspective to be held at the previously assessed
level.
Reputational 4x2 = 8
No change
This risk score reflects a higher likelihood
because of the challenges the council faces
during a period of change which elicits a range of
views not all of which can be accommodated.
Impact is assessed as low given established
governance processes in place for decision
making.
Operational
Continuity and
Performance
4x3 =12
No change
Organisational capacity reductions can have an 
impact on performance and service delivery
targets – these are managed to the extent
possible acknowledging the residual risks that
remain as a consequence of service redesign
and change.
IT
(Technological)
4x5 =20
No change
The dependence on technology for almost all
council functions is recognised by the ICT
service which has plans and processes in place
to ensure service provision is maintained,
however, threats from cyber-attack and
complexity of systems means the residual risk
score remains high.
Economic
Sustainability
2x3 = 6
No change
A macro risk for the wider Moray Community, the
council nevertheless has a pivotal role in working
with partners and securing funding from external
sources to optimise economic wellbeing for all
sectors of the community. Progress on multiple
developments in conjunction with others is
positive and this has enabled the risk score to be
maintained at the previously assessed level. 
5.  PROPOSALS  
5.1  The Committee is asked to consider and approve the latest iteration of the Corporate Risk
Register dated April 2026. 
6.  SUMMARY OF IMPLICATIONS  
Page 233

Page 234

6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) X 
Policy and Legal X 
Financial  X
Risk X 
Staffing  X
Best Value and Transformation X 
Property  X
Information Communications Technology/Digital             X
Equalities. Social Inclusion and Economic Impact   X
Climate Change and Biodiversity Impact  X 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☒ Improving wellbeing of our population.   
6.3  Policy and Legal 
The Council is required to have effective arrangements in place to manage risk as an
element of good governance practice.  
6.4  Financial 
There are no financial implications arising directly from this report. 
6.5  Risk 
This report is about the management of risk.  
6.6  Staffing 
There are no staffing implications arising directly from this report.  
6.7  Best Value and Transformation
Page 234

Page 235

Effective and responsible management of risk is essential to ensuring the council
optimises its use of resources in securing Best Value. Measured risk taking is an essential
element of service transformation.  
6.8  Property
There are no property implications arising directly from this report.  
6.9  Information Communications/Technology/Digital 
There are no ICT/Digital implications arising directly from this report.  
6.10  Equalities, Social Inclusion and Economic Impact 
There are no Equalities, Social Inclusion or Economic Impacts arising directly from this
report.  
6.11  Climate Change and Biodiversity Impacts 
There are no Climate Change and Biodiversity Impacts arising directly from this report. 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with the Extended Corporate Leadership
Team and any comments made have been incorporated into the report.  
8.  BACKGROUND PAPERS  
8.1  None   
Page 235

Page 236

Appendix 1       
MORAY COUNCIL 
CORPORATE RISK REGISTER AS AT
APRIL 2026 
Page 236

Page 237

Appendix 1       
SUMMARY OF PRINCIPAL RISKS  
Nature of Risk Main issues Risk Score Risk
Movement
1. Collaborative Leadership Leadership risk was a recurring theme in Best Value reports and with external
support, improvements in strategic leadership and decision-making processes have
been achieved. A survey of elected members confirmed a positive direction of travel
in early 2025, and the survey is being repeated at the time of updating this risk
register to assess progress. The Committee report format has been updated and
working groups including the Strategic Leadership Group and the Budget
Development Forum strengthened to enhance cross party working and aid decision
making. A comprehensive induction programme has also been developed to support
Chief Officers recently appointed by the council as part of the agreed senior
management restructuring exercise. The risk score remains unchanged pending the
outcome of the current elected member survey (likelihood 3 x impact 4). 
12 
2. Financial               Financial constraints across the public sector continue to impact on the council in
terms how it resources service provision. This is being managed using short, medium,
and long-term financial plans, notwithstanding financial settlements from Scottish
Government are for one year only. The setting of a balanced budget for 2026/27 has
been achieved without use of unearmarked reserves through a combination of an
improved financial settlement from Scottish Government, an increase in Council Tax,
and savings generated through measures developed in line with the council’s
transformation plan. A number of unknowns including impacts of inflation have been
highlighted during the budget setting process; geopolitical events are also impacting
on costs, and future budget pressures are expected in a number of service areas
including as a consequence of asset deterioration and the council’s ongoing funding
obligations to the Moray Integration Joint Board. Longer-term financial planning
projections note that further Council Tax rises and additional savings will be required
going forward. The external auditor has reported  that actions taken by the council
have reduced risks around financial management. Consequently, while both the
likelihood and impact of financial challenges going forward remains high, the risk
score has reduced to 16 due to management intervention and budget decisions.
(likelihood 4 x impact 4). 
16 
Page 237

Page 238

Appendix 1       
2
3.  HR (People) Inability to recruit and retain well qualified or experienced staff across several service
areas remains an issue, manageability of workloads requires service prioritising
within available resource for longer term sustainability. The Corporate Workforce Plan
has been refreshed, - designed to enhance leadership capacity, provide development
opportunities to equip staff for change; aid staff health and well-being; and address
recruitment and retention challenges. Annual employee surveys and follow up work
also assist in further identifying areas where improvement and development action is
required.. Whilst the risk remains that the council is unable to recruit to some posts as
a consequence of multiple factors, the successful completion of the Phase 1
restructure has shown that, through agile working practices, the council is able to
broaden its search and attractiveness for suitable candidates.While this is positive,
absence levels have been identified as high across various functions, and increased
absence management techniques are being applied to improve  performance; with
initial work  being piloted in Education. . The assessed risk score has reduced to 16.
(likelihood 4 x impact 4). 
16 
4. Regulatory Council operates in a heavily regulated environment and delivers a broad range of
statutory services. Corporately, constitutional documents are subject to regular
review and updating and across services policies and guidance aid compliance
with regulatory requirements. Performance management arrangements monitor
progress internally, and oversight comes from auditors, regulators and inspectors
both external and internal to the organisation. Recommendations made are used
as learning points and applied, subject to resource constraints, to improve 
compliance and secure continuous improvement. Senior leaders have an
improved understanding of the capacity challenges facing the organisation and the
elevated risk impacts should there be non-compliance with regulations. The risk
score is unchanged (likelihood 3 x impact 3). 
9  
5. Environmental Council’s commitment to addressing climate change remains.. A number of initiatives
have been taken forward aimed at mitigating adverse impacts. These include work on
promoting active travel, improved biodiversity, high waste recycling rates, solar
panels on council premises and LED lighting, and decarbonisation of council 
6  
Page 238

Page 239

Appendix 1       
buildings, alongside policy developments linked to the forthcoming Local
Development Plan. There has been a 7% reduction in recorded CO2 emissions since
2023/24.   External funding has been secured to expand the number of charging
points for electric vehicles. The previously reported risks of ability to drive forward
change and the costs of doing so still apply, with Scottish Government climate targets
extended.  Availability of capital funding will inform what more can be achieved.
Opportunities are being pursued to secure additional Just Transition funding in 2026
for use in delivering further mitigations in line with the recently updated Climate
Change Strategy. The risk score reflects the multiple actions being taken by the
council to address this risk and remains unchanged from the prior review. (likelihood
3 x impact 2). 
6. Reputational Reputation depends on consistent application of good governance standards,
and the council publishes a governance statement each year with its annual
accounts explaining how it complies with best practice guidance. The council is
committed to maintaining these standards, notably in being open and transparent
around its decision-making processes, and in adopting effective consultation with
citizens and service users. Integrated Impact Assessments are used to inform
policy decisions as appropriate. While reputational issues occur from time to
time, these are managed through engagement and action as appropriate. Given
the breadth and scale of services delivered, the need for transformational
change, and expectations of service users, the likelihood of reputational issues
arising from time to time remains  albeit with the impact typically localised. The
risk score is unchanged. (likelihood 4 x impact 2). 
8  
7.  Operational             
Continuity and                 
Performance
Council performance falls below targeted levels for sustained period; performance
reporting is delayed. Transformational change does not proceed at pace due to
capacity issues. Council has been advised during budget setting that a reduction in
capacity, without a reduction in council activities and duties, can result in a less
resilient organisation. This has the potential to impact on partnership and cross
service working, reduce capacity to respond to emergencies, and reduce capacity
to support and develop staff. While significant adverse cumulative impacts are not
inevitable this riskrequires careful monitoring. The risk score remains unchanged
(likelihood 4 x impact 3). 
12 
Page 239

Page 240

Appendix 1       
8.  IT (Technological) Major disruption in continuity of ICT operations; changes to systems and processes
and new ways of working create added pressures for ICT staff; data security is
compromised. With ICT systems integral to the effective delivery of most if not all
services, the impact from disruption to services is at the highest level and
notwithstanding risk mitigation measures in place, the potential for disruption,
including from external threats, cannot be discounted. The service has reviewed and
updated its ICT Strategy and Plan, and a new Digital Strategy and Plan has recently
been agreed to guide service activity and development for the next three years. Work
is well advanced to upgrade the schools network as part of a national programme and
is being closely monitored to ensure all strands of the project are progressed to a
satisfactory conclusion.  Additional capacity has been created in relation to cyber
resilience as well as at strategic leadership level through the recent management
restructure. Despite this, the risk level here is unchanged as the volume of reliance
on ICT across all services continues to increase. (likelihood 4 x impact 5). 
20 
9.  Economic                 
Sustainability
The Corporate Plan has as one of its three objectives the building of a stronger,
greener, vibrant economy. This links to separate policies on climate change/
biodiversity and community wealth building, and aligns with the Moray Economic
Strategy developed on a multi-agency partnership basis. The Strategy sets out an
ambitious vision and programme of work designed to support economic
development in Moray over a ten-year period and will be complemented by the
Local Development Plan currently in preparation. The Moray Growth Deal is
being taken forward alongside other projects being delivered through the
Levelling Up fund and the Pride in Place funding for Elgin, as well as through bids
into the Just Transition Fund. Further opportunities are also under consideration
aimed at stimulating the local economy alongside opportunities through the
Highlands and Islands Regional Economic Partnership. The risk score remains
unchanged (likelihood 2 x impact 3). 
6  
Page 240

Page 241

Appendix 1       
RISK CLASSIFICATION 
RISK RATING LOW MEDIUM HIGH VERY HIGH
RISK MOVEMENT DECREASE
↓
NO CHANGE
↔
INCREASE
↑
The process for managing risk is documented separately in the council’s risk policy and guidance notes. The risk rating
is calculated by reference to assessed likelihood and impact (on a scale of 1 to 5) for each identified risk. The minimum
score (lowest risk) being 1x1=1, the maximum (highest risk) 5x5 =25. Scores of 3 and below are ranked low, green;
between 4 and 6, medium, yellow; between 8 and 12 high, amber; and 15 and above very high, red, as per the table
below. 
LIKELIHOOD 
Almost certain 5 5 10 15 20 25 
Likely 4 4 8 12 16 20 
Possible 3 3 6 9 12 15 
Unlikely 2 2 4 6 8 10
Remote 1 1 2 3 4 5 
1 2 3 4 5 
Minimal Minor Moderate Major Catastrophic 
IMPACT Page 241

Page 242

Appendix 1       
1.
Description of Risk: Collaborative Leadership.
A lack of collaborative working between councillors/councillors and councillors/officers creates the risk that: 
• The Council’s strategic priorities are not fully achieved.
• The Council’s decision-making processes are less effective with decisions being delayed or avoided.
• Staff time resources are not optimised on council priorities.
• Partnership working is not as effective as it could be.
Lead: Chief Governance Officer 
Risk Rating: low/medium/high/very high Rationale for Risk Rating:
Leadership risk has been a theme running through council Best
Value Assurance Reports for some time. 
The following work has been carried out to mitigate this risk: 
• External support was sought in 2024/25 to support
improvements in strategic leadership and decision-making
processes. Actions from this work have now bedded-in and a
survey of elected members in February 2025 established that
there had been an improvement in the collaborative
leadership between councillors and senior officers. This
survey has been repeated in April 2026. The survey results
are not available at the point of updating this register but will
be reported verbally at committee. 
• There has been continued  closer working across political
groups and non-aligned councillors through groups like
Strategic Leadership Group and Budget Development Forum. 
• Further work has been carried out to improve the quality of
information which Councillors receive in the decision-making
process,  through a revised Committee Report format.
• A joint self-assessment session was held with Councillors and
Senior officers on 28th April to look at Corporate Continuous
Improvement. Actions from that session will be incorporate
into an improvement plan. 
Following a recent Senior Management Restructure a number of
senior officer posts required to be filled. This created a risk of loss of
corporate knowledge and requirement to build new working
relationships.  This risk has been mitigated by a comprehensive
induction programme for newly appointed officers. 
HIGH
Likelihood 3 x Impact 4 = Score 12 
Page 242

Page 243

Appendix 1       
The overall risk score is unchanged. 
Risk Movement: increase/decrease/no change Risk Appetite: 
There is a moderate to high  appetite for the council to be successful
in delivering best value services for its citizens against a challenging
background of increasing demand and diminishing resources and a
need to identify service priorities. Political stability is key to this
success. Note: the risk appetite evaluation for all risk categories
meantime references the assessment contained in the draft   risk
appetite statement. 
Controls: Current and Proposed Mitigating Actions: 
Page 243

Page 244

Appendix 1       
Suite of governance documents in place and regularly updated.
Cycle of Council and Committee meetings established to discharge
leadership functions.
Ten-year strategic plan - Moray 2027 (the Local Outcomes
Improvement Plan) being delivered jointly by the council and its  
community planning partners.
Corporate Plan for 2024/26 implemented identifying council priorities
and aligning these to the budget setting process. 
Best Value Action plan addresses collaborative leadership, with
external support secured.
Additional measures adopted to support inclusive cross party working.
Committee report format updated to ensure decision making
processes have regard to all relevant policy implications.
Scrutiny briefing delivered for elected members outlining the benefits
to be derived from discrete and targeted scrutiny reviews. 
Collaborative working/ leadership survey  for 2026 underway to
sustain benefits of cross party working. 
Approach to developing updated Local Outcomes Improvement Plan
– including community engagement – being considered in conjunction
with the partners in the Community Planning Board.
Plans in train to promote leadership development following 
appointment to the post of Chief Executive.
Risk appetite being formalised to guide policy approach to planned
transformation and change – risk appetite statement prepared for
council approval in May 2026.
Consideration to be given to providing dedicated resources to
partnership working to enable more focused action to be taken on joint
initiatives.
Partnership working through Community Planning Board continues
including monitoring of delivery of the Local Outcomes Improvement
Plan, and consideration of multi-agency topics including Children’s
Services and Population Health.
Workshop planned to consider further approaches to addressing
Poverty.
Resourcing of scrutiny reviews remains under consideration. 
Page 244

Page 245

Appendix 1       
2.
Description of Risk: Financial: A balanced budget was set for 2026/27, building on similar approach taken in 2025/26. This demonstrates
management’s ability to take careful consideration when setting its service levels against the reality of an increasing demand competing with
limited ability to increase its monetary and fiscal income., This is exacerbated in the medium-long term withuncertain levels of government
funding in future years, price inflation, the potential for increases in interest rates leading to higher borrowing costs, and limitations on
availability of capital funding for asset maintenance and renewal. Uncertainties around the council’s current and future funding obligations to
the Moray Integration Joint Board add to this risk. 
Savings targets for future financial years have been identified as part of the council’s short term financial plan through to 2028/29 year, to be
achieved through efficiencies, increased revenue generation and changes to service provision through the council’s continuing
transformation programme. The risks in doing so are significant having the potential to impact on all sectors of the community, particularly so
on those who are most disadvantaged. The council recognises its duty to minimise inequality by targeting support towards those who need it
most. Financial risk is being actively managed with financial monitoring and reporting undertaken throughout the year. 
Lead: Executive Director Finance, Strategy and Transformation (Section 95 Officer)
Risk Rating: low/medium/high/very high Rationale for Risk Rating: 
The Council has consistently delivered significant savings in recent
years and has been able to set a balanced budget 2026/27, with the
outlook to 2027/28 also looking like a balance position could be
achievable. Thus, management intervention is reducing the
likelihood. However, the need to make further savings remains, and
the challenge of continuing to do so while meeting service demands
will be increased given the factors outlined above.. 
Very HIGH
Likelihood 4 x Impact 4 = Score 16
Risk Movement: increase/decrease/no change Risk Appetite:
The council has moderate  risk appetite for effective financial Page 245

Page 246

Appendix 1       
management balancing the need to manage its finances  in a prudent
manner while optimising opportunities that enhance service delivery
and performance., It is of note that public finances generally are
constrained with continuing uncertainty around future financial
settlements that will be allocated to Local Government. 
Page 246

Page 247

Appendix 1       
Controls:
Financial plan in place with budget projections in place for current and
next two financial years.
Financial pressures identified.
Ten-year capital plan reviewed for affordability; cap mechanism
agreed.
Short/ medium/ long term financial plans developed. 
Regular budget monitoring reports (on capital and revenue)
presented to council.
Financial Reserves policy reviewed and updated.
Financial regulations in place and regularly reviewed.
Treasury Management strategy agreed and monitored.
Procurement Policies and Practice.
Energy Monitoring and Reporting.
Internal Auditing; External Audit and Inspection
Annual pricing review on charges for services. 
Current and Proposed Mitigating Actions:
Ongoing financial plan monitoring and reporting to ensure council
oversight and visibility of progress to address budget challenges. 
Work of the ‘Transforming the Council’ and Programme Boards
including the BVAR and the Transformation Strategy to inform cost
reductions aligned to potential redesign of services.
Working closely with and seeking assurances from the Moray
Integration Joint Board to ensure, so far as is practicable, that the
financial contribution to be made from Council resources does not
exceed budget projections.
Depot Review project implementation being progressed
Continue development of participatory budgeting processes through
community engagement and involvement as appropriate.
Monitor changes in key finance roles to ensure financial governance
standards are maintained
Refresh of guidance on determining tax on payments to self-
employed contractors planned to affirm compliance with HMRC rules
(IR 35) 
Page 247

Page 248

Appendix 1       
3.
Description of Risk: Human Resources (People): 
Continuing challenges exists in recruiting various teaching and promoted teaching posts, specialist professional and senior management
posts, fleet services and discrete areas of social care. The age demographic at senior and service manager level is likely to bring an
increased level of turnover for the next 18 -24 months and a corporate succession planning approach has been agreed that should help to
mitigate this. With staff the council’s most important resource, there is a need to ensure employees are equipped to embrace change and
deliver services in different and innovative ways that as far as possible are sustainable at a time when resources are reducing. There are
actions within the corporate workforce plan to empower staff and prepare them for change. This will prove challenging  with further budget
cuts that may have  potential workforce implications, although current predictions are that these are likely to be in contained service areas
rather than across the whole workforce. There remains a risk that corporate and service plan targets will not be met, leading to reduced
service quality and performance. That being, the successful recruitment and completion of Phase 1 structural change demonstrate that agile
working and a flexible approach by the council extends the search area pool of talent. 
Lead:  Head of People, Change and Community Strategy 
Risk Rating: low/medium/high/very high Rationale for Risk Rating: 
Reduced ability of smaller teams to deal with competing and complex
demands and to forward plan across a wider Council agenda and be
ready with a strategic response.
Difficult to recruit in a range of areas including certain subject
teachers; vehicle technicians; specialist professional posts; senior
management; clerical and administrative roles; temporary and relief
staff; and community care employees. Increased agility for recruiting
roles that have higher levels of flexibility in where and how they are
delivered. 
Staff turnover leads to loss of expertise and ‘corporate memory’.
Workforce planning is used to offset this, especially for key roles.
Inability to meet service demands and secure continuous
improvement.
Given the foregoing issues the risk rating remains at a very high level
with current staffing challenges almost certain to continue. However 
the likelihood score  has reduced to 4 given the success with regards
to Phase 1 recruitment.  with consequential moderate to high impacts
in service areas directly affected. 
VERY HIGH
Likelihood x Impact 4 = Score16
Page 248

Page 249

Appendix 1       
Risk Movement: increase/decrease/no change Risk Appetite: 
The council as a responsible employer has a duty to provide a safe,
attractive, and rewarding place to work, with employees central to
the successful delivery of the council’s strategic and service
priorities. Accordingly, while acknowledging challenges in aspects
of public sector recruitment and changes to working practice to
secure efficiencies, there is a low to moderate   appetite for
changes that impact on thethe health and welfare of staff, to ensure
that staff morale and motivation is maintained at a high level and
that the council is seen as an attractive place to work. 
Controls:
Corporate Workforce Strategy in place.
Leadership Development Programme established.
Employee Communications & Engagement Framework (including staff
newsletters, briefings, Interchange bulletins, senior manager visits and
manager forums)
Health and Work Policy
Health and Safety Policies and Annual Report.
Absence Management Policy
Pilot of absence management review within
Education under way
Living Wage Employer accreditation secured to support recruitment
strategies.
Flexible working policy refreshed and rolled out as part of Smarter
Working Initiative.
Fire risk assessments completed in line with planned schedule.
Mental health and wellbeing Pulse Survey results used to inform
improvement actions. 
Current and Proposed Mitigating Actions:
Completing Phase 2 of structural review in 2026/27.Annual
Review of Workforce Strategy and Plan for 2024 to 2027
completed and activity to address the main themes of:
• Leadership capacity and development; ensuring leaders,
managers and supervisors are equipped with skills and
behaviours necessary for new ways of working.
• Supporting the workforce through a period of change
including active management of vacancies and maintaining
good employee relations.
• Organisational Development, with the workforce
empowered and enabled to embrace change through a
range of in-person and on-line training opportunities. 
• Reviewing recruitment and retention strategies, continuing
with apprenticeship and training programmes, and
developing succession planning, where appropriate.
• Health and Wellbeing initiatives being taken forward to
support staff in the workplace, with linked objectives of
proactively supporting attendance at work and reducing
incidents of violence and aggression against staff.
• Support consistent application of employee review and
development programme to aid workforce development.
Whole workforce survey completed and now on annual
schedule; this helps monitor trends/issues across a range of
employment themes and related improvement actions. 
Page 249

Page 250

Appendix 1       
4.
Description of Risk: Regulatory: Expected governance standards are unmet. Council is subject to censure.
The council is heavily regulated by statute, by national guidance and through local policy and procedures and, within its systems, has
established checks and balances to support delivery of intended outcomes. Adapting council priorities and plans to accommodate new duties
is key to limiting the risk of regulatory failure with elected members, on the advice of senior officers, being responsible for creating capacity to
accommodate changes to policy and service delivery revisions. 
Lead: Chief Governance Officer
Risk Rating: low/medium/high/very high Rationale for Risk Rating:
Governance arrangements have been developed over many years
and are subject to regular oversight and monitoring.
Systems and processes are subject to on-going review and
development within the council and its services.
Corporate support and review in relation to performance, audit, and
inspection.
Change increases the risk of system breakdown and non-compliance
with regulatory requirements.
In the current economic climate and having regard to the challenges
facing the wider public sector a neutral scoring has been allocated
with a regulatory breach not likely but possible and the impact
potentially in the range from significant to minor dependent on the
circumstances presenting.   
HIGH
Likelihood 3 x Impact 3 = Score 9
Risk Movement: increase/decrease/no change Risk Appetite: 
The council has low appetite for regulatory failure and takes seriously
its responsibility to ensure all services are following statutory
regulations and standards. A robust approach is taken to securing
governance arrangements which includes suitable systems of
internal control, albeit capacity issues can emerge where new duties
are placed on the council. 
Page 250

Page 251

Appendix 1       
Controls:
Governance statement prepared annually in line with best practice
guidance.
Monitoring officer oversees governance processes.
Constitutional documents available to direct good governance. 
External scrutiny and inspection
programme.
Internal and external audit arrangements.
Suite of Governance and Scrutiny documents in place and
regularly updated.
Annual service planning process.
Current and Proposed Mitigating Actions:
Continue to monitor likely impacts from new policy initiatives that
have the potential to require significant council resource inputs.
Consider statutory duties and other directions, including Integrated
Impact Assessments where applicable, when reviewing and updating
strategic plans and council priorities.
Ensure capacity to deliver new duties is fully considered and
anticipate and report on any implications that have potential to lead
to non-compliance. 
Conclude delivery of actions in Best Value action plan.
Pro-active management response to issues raised in inspection
reports.
Continued active participation in delivery of joint services with statutory
and other partners as appropriate.
Work being progressed to refresh policy and practice in compliance
with the Public Records (Scotland) regulations. 
Page 251

Page 252

Appendix 1       
5.
Description of Risk: Environmental: Ability of the council to respond to climate change emergency, to keep up with the pace of changing
carbon reduction, waste, and environmental targets. Impact of climate change and severe weather events; ability to deal with unforeseen
emergencies is compromised by inadequate resilience. The council continues to invest in projects to address climate change issues, to
manage energy use and ensure, so far as is practicable, that it can contribute to the response to crisis situations in conjunction with the
emergency services and other partners.
Leads: Head of Operations and Environment; Head of Growth, Planning and Climate. 
Risk Rating: low/medium/high/very high Rationale for Risk Rating:
The Council’s commitment to address climate change
remains. A number of initiatives have been taken forward
aimed at reducing carbon emissions. These include work
on promoting active travel, high waste recycling rates and
decarbonisation of council buildings, alongside policy
developments linked to the forthcoming Local
Development Plan. 
Work with others is also taking place to expand the
number of charging points for electric vehicles. The co-
benefits of environmental activities include improving local
biodiversity, access to the countryside, reducing energy
bills for tenants, creating more connected vibrant
communities. 
While these are positive mitigations against environmental
risk, and have been supplemented recently with an
agreed Biodiversity Strategy, an update of the Climate
Change Strategy currently out for consultation,
progressing bids for the Just Transition Fund, and net
zero considerations fully embedded in LEIP funding terms
for Forres Academy, cuts in capital budgets means the
ability of the council to reduce our emissions in fleet and
buildings is diminished. The previously reported risks of
ability to drive forward change and the costs of doing so
still apply, with Scottish Government climate targets
extended and availability of funding having the potential to
limit what can be achieved. 
The risk score meantime remains at the previously
assessed level noting that this risk has the potential to 
MEDIUM
Likelihood 3 x Impact 2 = Score 6 
Page 252

Page 253

Appendix 1       
increase longer term depending on progress that can be
made with adaptation mitigations and in delivery of the
newly proposed Climate Strategy Actions. This will be
closely monitored. 
Risk Movement: increase/decrease/no change Risk Appetite: 
There is a high risk appetite to limit environmental impacts 
demonstrated by the multiple measures being taken to
reduce carbon emissions and address climate change 
while recognising cost constraints and the collective
societal will required to address environmental impacts. 
Controls: 
Climate Change Strategy for 2020-2030 refreshed for 2026.
Climate change route map to zero updated and subject to ongoing monitoring.
Climate change and energy teams in place.
Recycling awareness promoted and high rates achieved. 
Residual waste no longer sent to landfill but processed through energy from
waste plant. 
Street light replacement programme completed to reduce carbon emissions and
energy costs.
Electric pool cars introduced as part of council fleet de-carbonisation together
with cycling/walking initiatives.
Housing investment programme which aims to achieve energy efficiency
standards.
Moray Local Development Plan considers climate change issues. 
Council part of North of Scotland Regional Resilience Partnership
Council Co-ordination Centre established and operational; crisis communications
secured.
Energy efficiency measures built into new school building programmes.
Emergency response co-ordinators and support staff identified and trained. 
Growth Deal – Bus Revolution being implemented to improve access to greener
travel.
Just Transition Funding secured to support feasibility studies aiding transition to a
zero-carbon economy.
Smarter working protocol established to reduce staff travel.
Coastal Adaptation Plans in place
Current and Proposed Mitigating Actions: 
Depot Review being progressed– contributing to de-
carbonisation through reduction in portfolio of buildings to
service and maintain.
Route map to zero monitoring and reporting.
Supporting locally sourced procurement to limit
environmental impacts.
.
Climate change team considering adaptation measures:
adjustments in response to observed and projected climate
change impacts.
Planning for emergency disruption from extreme
weather/geopoliticalevents under ongoing review
Continue working with partners where appropriate to
secure additional funding that will support climate change
mitigation initiatives.
Biodiversity strategy approved in principle, currently out to
consultation.
.
Application bids for next round of Just Transition funding
under consideration.
Planning applications incorporate submissions on energy
efficiency on new build properties. 
Page 253

Page 254

Appendix 1       
Rollout of public vehicle electric charging points as part of
the North of Scotland EV charging Infrastructure
Partnership agreed. 
Page 254

Page 255

Appendix 1       
6.
Description of Risk: Reputational: Not meeting agreed performance targets (e.g. on educational attainment); not delivering on
transformation projects, overspending or failing on a school build; major adult or child protection failing, missing a major policy direction or
funding opportunity because resources/capacity are limited. 
The council provides services to all sectors of the community and while committed to high service standards, the diversity of service provision
and the expectations of the public may increase the risk that the council’s reputation could be called into question. This risk generally is
considered to be managed through service planning, performance management, organisational development, the application of codes of
conduct, complaints procedures and similar, however any reduction in services to any individual or group of individuals may justly or
otherwise impact on the council’s reputation.
Lead: Chief Governance Officer
Risk Rating: low/medium/high/very high Rationale for Risk Rating:
The risk rating has regard to established systems, procedures and
controls designed to prevent adverse reputational damage, and how
updated policies increasingly reference the need for prioritisation of
scarce resources. This recognises that with service reduction and
curtailment, the likelihood of increased criticism of council services
remains high while the potential impact is also unchanged at the
present time. In part this is based on it being evident that service
delivery challenges apply across the public sector, and through
various mechanisms including community engagement, media
reports nationally and locally, and complaints responses there is an
increased understanding of the challenges faced. 
HIGH
Likelihood 4 x Impact 2 = Score 8
Risk Movement: increase/decrease/no change Risk Appetite:
The council has low appetite for reputational risk and is committed to
continuous improvement in the delivery of services either on its own or
with partners. It seeks to deliver these services having regard to its
equality duty and has set targets for doing so through a customer
charter. i It is recognised that reputational damage is a potential
consequence of service reduction or cessation.  
Controls:
A suite of policy, strategy, governance, organisational development,
project management and performance management measures are in
place to enable delivery of the services to a standard which mitigates
the risk of significant damage to the council’s reputation.
Consultation protocols established and range of consultation and
engagement with public and workforce carried out over period of time.
Customer charter in place and customer focus strategy developed to
improve citizen engagements and provide a consistent experience
Current and Proposed Mitigating Actions:
Ongoing review, redesign and implementation of policy, strategy
governance, organisational development, project management and
performance management.
Regular meetings with officers and inspection agencies to support and
challenge progress towards improvement.
Means of communicating changes impacting service users to be
monitored.
Improved outcome reporting of service delivery and linked Page 255

Page 256

Appendix 1       
across services.
Formal complaints procedures in place.
Performance management reporting framework updated.
Corporate Leadership Team monitors external inspection processes
and outcomes.
Freedom of Information processes.
Risks fully considered in committee reports requiring a decision.
Suite of Governance documents in place and regularly updated.
performance indicator measures.
Progress Transformation Programme to optimise service delivery
arrangements. 
Page 256

Page 257

Appendix 1       
7.
Description of Risk: Operational Continuity and Performance: The council is unable to deliver services; performance falls below acceptable
levels for a sustained period; insufficient business continuity planning; changes in working practices impact on service delivery. Asset
deterioration or failure impacts on service provision. Going forward it is recognised that operational continuity and performance may be
affected as a consequence of service re-design and changes in service delivery and challenges remain to ensure alignment of available
resources to service delivery standards.
Lead: All Heads of Service
Risk Rating: low/medium/high/very high Rationale for Risk Rating:
The risk rating is an aggregate of various factors, services continue
work to remain resilient and minimise disruption; experience of
adapting to new ways of working has increased service flexibility yet
challenges remain. Performance is monitored but can be impacted in
certain areas should services be scaled back due to changes in
policy priorities; in such circumstances this risk requires continued
active management. The risk score is unchanged. 
HIGH
Likelihood 4 x Impact 3 = Score 12
Risk Movement: increase/decrease/no change Risk Appetite: 
There is a moderate to high appetite for risk taking where efficiency
and effectiveness of service delivery is improved, noting the council’s
duty  to prioritise delivery of statutory services and ensure so far as 
practicable that the needs of the vulnerable service users are met. 
Controls:
Asset Management Working Group meets regularly.
Transformation Board in place to evaluate options for change/service
improvement.
Programme for updating business impact assessments/business
continuity plans in place for critical services.
Organisational Development Team promoting workforce and
leadership development.
Communication strategy for informing service users of impending
changes to services developed. 
Current and Proposed Mitigating Actions:
Review Performance Management Framework to ensure it aligns
appropriately to revisions to service provision in the Corporate Plan.
Public Service Improvement Framework assessments restarted with
support from Improvement Service and plan in place to complete
reviews across participating services.
Review timetable for performance reporting aligning with reporting
framework for data collected as statutory performance information as
appropriate.
Progress Transformation Programme.
Building resilience in procurement processes being refreshed to
capture current risk of key supplier failure.
Business continuity plans being updated for critical services in line
with BV action plan recommendations Page 257

Page 258

Appendix 1       
8.
Description of Risk: IT (Technological) Major disruption in continuity of ICT operations; data security is compromised. Changes in working
practices post pandemic  place more reliance on ICT infrastructure, capacity, and support. The risk of cyber-attacks remains high and
cannot be eliminated, with attacks being nuanced over time and requiring the council to be constantly alert to new threats. The prevalence
of working from home results in greater isolation and increases the risk of successful exploitation via malicious emails, and the risk of data
breaches. 
Reliance on third-party suppliers and contractors for ICT services (including cloud, managed services, and software vendors) introduces
risks if these partners fail to deliver, experience financial distress, or suffer their own security incidents. Disruption to council operations may
occur due to supplier failure, contract disputes, or changes in service provision, particularly for cloud-based and outsourced services. 
Outdated infrastructure and unsupported software increase vulnerability to security threats, reduce efficiency, and complicate integration
with new systems. 
Deployment of AI solutions such as Copilot for Microsoft 365 can introduce risks of bias and lack of transparency. 
Lead: Head of Customer Experience, ICT and Digital Services. 
Risk Rating: low/medium/high/very high Rationale for Risk Rating:
A recurring theme from senior management is that the success of
their services in many respects is predicated on the availability of
robust and adaptable ICT systems. This creates an elevated risk that
has been recognised centrally, albeit it brings with it a number of
challenges in terms of resourcing changed ways of working both to
infrastructure and in terms of staffing to support that change as
required. Meanwhile cyber security continues to have a high profile,
and the ICT service has a suite of controls in place to mitigate known
risks in this area. Intelligence in relation to recent successful cyber-
attacks has highlighted that the disruption to the affected
organisations can be widespread. It is also likely that significant costs
will be incurred during recovery, and that the full restoration of
business operations can take months, if not years to complete. 
VERY HIGH
Likelihood 4 x Impact 5 = Score 20
Risk Movement: increase/decrease/no change Risk Appetite:
Page 258

Page 259

Appendix 1       
There is low to moderate risk appetite, relative to use of technology
with  zero appetite for service interruption or data loss,but a moderate
appetite for greater use of technological solutions that aid service
efficiencies. 
Controls: 
Establishment of dedicated Cyber Resilence and Information Security
Team 
Corporate Information Security Policy. Senior Information Risk Officer.
External   accreditation   processes   for Network Security (Public
Services Network, Cyber Essentials Plus)
Environmental Controls for Data Centre (cooling, fire, flood, and
backup power)
Boundary Firewalls and Internet Gateways (email and web filtering)
Data control enhanced through network controls.
Malware Protection
Cyber resilience standards aligned to SG Cyber Resilience
Framework
Cyber Incident Response Plan 
Patch management (Applications and Infrastructure)
Third Party Maintenance Agreements (Applications and
Infrastructure)  
Main financial system supported in-house.
Information Assurance Group
Records Management Policy 
Data breach reporting arrangements 
Working from home policy/guidance
Checks embedded in the procurement process when introducing new
systems.
Published guidance on AI guardrails, complemented by awareness
sessions for staff and Elected Members.
Participation in Scottish Local Authority Information Security Group
Online platform for security awareness training and simulated
phishing exercises
Current and Proposed Mitigating Actions:
Information Security Policy review /update underway
Computer Use Policy refresh underway.
Assess controls as part of plans for continuing development
of digital services.
Penetration testing for applications implemented to deliver
digital services.
Participation in the Scottish Government Cyber Resilience Programme 
Extend accreditation process to include the Education ICT network.
Work to improve network IT connectivity in schools continuing.
Continue with the programme of work to address awareness raising,
e-learning and phishing campaigns to educate users of ICT systems –
attempting to mitigate and reduce the ‘human error’ element.
Complete the review of the ICT Business Continuity Plan 
Cyber Resilience – ongoing monitoring and application of emerging
best practice.
Continue to monitor feasibility of insurance cover for cyber-attacks.
Comprehensive assessment of the existing business systems estate
and underlying technologies.
Introduction of CMDB (configuration management database) to better
manage system interdependencies.
Ongoing review of new technologies with the development of
appropriate governance and guardrails. 
Investigate options for the implementation of an external Security
Operations Centre (SOC) to complement internal cyber resources.
Undertake tabletop exercising.
Assess options for the procurement of a Cyber Incident Response
supplier.
Implement Change Control Policy.
Undertake assessment of Education network post implementation of
SWAN 2 to identify any residual issues.
Draft new Education ICT Strategy. 
Page 259

Page 260

Appendix 1       
Page 260

Page 261

Appendix 1       
9.
Description of Risk: Economic Sustainability. Higher inflation and increases in interest rates have the potential to an impact on capital
projects including the Moray Growth Deal. The cost of doing business and higher energy costs adversely impact on the business community.
Increased strain on household incomes /budgets may impact on council tax revenues and income from council house rents; business failures
may create similar pressures on business rates. Many of these are factors outside the control of the council but continue to have an influence
on how it reacts and plans for the future.
Lead:  Head of Growth, Planning and Climate 
Risk Rating: low/medium/high/very high Rationale for Risk Rating:
The cost-of-living crisis, a reduction in the working age population,
housing, and childcare remain as potential impediments to economic
growth, with both the council and its partners actively working to
address these issues. The Local Outcomes Improvement Plan and
the Corporate Plan, underpinned by the ten-year Moray Economic
Strategy, guide investment priorities and involve significant input from
multiple council services including Planning, Housing and Education.
Levelling Up and other regeneration funding in Moray Growth Deal
aims to stimulate to local economy and meantime work through
Highlands and Islands Regional Economic Partnership has
highlighted Regional Transformation Opportunities for the area of in
excess of £100bn with £12.4bn in Moray. A Moray Skills Summit was
convened in December to look at the skills pipeline, and a wider
Economic Summit is in planning for 2026. While these are all
significant positives, wider economic challenges including those from 
governmental budget rounds and the impact of international conflicts,
have the potential to impact on the Moray economy. Overall, the risk
score has been maintained as unchanged. 
MEDIUM
Likelihood 2 x Impact 3 = Score 6 
Risk Movement: increase/decrease/no change Risk Appetite:
Page 261

Page 262

Appendix 1       
The need to maintain a vibrant economy is prominent in both
community and council strategic plans. There is a high appetite to
create conditions that make Moray an attractive place to do business,
recognising that wider economic policy not within the council’s control
may influence business investment decisions going forward. 
Controls:
Moray Growth Deal - Funding for Growth Deal being progressed
bringing total investment to the area of over £100m.
Growth deal governance arrangements in place and elements of
programme being delivered in line with timetable. 
Moray Economic Strategy ten-year strategy developed with partners
and aligned to council strategic plans.
Partnership working with Highlands and Islands Enterprise, Moray
College UHI, Skills Development Scotland and others.
Oversight of programmes using ring fenced funding from  Just
Transition Funding, Pride in Place funding and the Strategic Priorities
Fund.
Expansion of pre-school provision.
Buckie Harbour Master Plan approved. 
Current and Proposed Mitigating Actions:
Progress Growth Deal projects in line with programme.
Continue work with partners to develop and deliver support aligned to
economic strategy objectives that include: 
• Increasing employment levels and number of companies
• Ensuring alignment between skills provision and the changing
economy
• Increased productivity leading to growing wages and
contributing to closing the gender pay gap.
• A labour market that provides the required numbers of workers
to take advantage of available opportunities-notably attraction
and retention of those aged 16-29.
• Continuing effort to secure Community Wealth Building
resource to support enhancement of the environmental, social,
and economic benefits in this area through an enhanced policy
position.
.
Page 262

Page 263

Report to: Corporate Committee Meeting Date: 26 May 2026  
Report by: Executive Director  Education, Housing and Communities      
Author: Emma Dawson Contact Email: emma.dawson@moray.gov.uk 
Subject: Information Report:  Community Rental Support Annual Review 
1.  PURPOSE 
☐ For Decision      ☒  For Information 
1.1  The purpose of this report is to provide details on the rental support awarded to
voluntary and community organisations (VCOs) occupying Council property.  
1.2  This report is submitted to the Corporate Committee in terms of Sections III (B) (20) and
III (B) (30) of the Council’s Scheme of Administration relating to the management of
Common Good and Trust property and to the monitoring and review of concessionary
rents respectively.  
2.  SUMMARY  
2.1  The Council has established suitable processes for assessing new requests from VCOs
seeking leases at concessionary rentals. However, several historic agreements remain
in place that pre-date these arrangements. Some of these earlier agreements involved
setting nominal rents fixed for the full duration of the lease, while others allow for
periodic review. This report outlines the rental support provided under both the historic
arrangements and those approved under delegated powers.  
3.  BACKGROUND AND CONTEXT  
3.1 On 1 September 2015, the Policy and Resources Committee agreed that rental support
provided to voluntary and community organisations (VCOs) occupying Council property
should be monitored through an annual report (para 8 of the Minute refers). On 25 May
2016, the Council agreed that all new applications from VCOs seeking leases at
below-market rental levels would be considered under the Community Asset Transfer
(CAT) scheme (para 22 of the Minute refers).  New lease applications processed under
the CAT scheme are reported in a separate annual report.  
3.2 Leases relating to properties with no commercial value, where the rent payable has
been reduced to reflect an agreement that the tenant will undertake improvement
Page 263

Page 264

works to the property, or those where the Council is restricted in its ability to charge
rent, are not considered discretionary rental support.  Accordingly, such leases are
excluded from the scope of this report.  
3.3 Legacy Arrangements
APPENDIX I details leases involving properties with a commercial value where nominal
rents have been applied as a form of discretionary rental support. In most instances,
these leases do not include provisions for a rent review during the lease term. Upon
expiry the Tenant may negotiate a new lease on commercial terms or submit an
application under the CAT scheme for a lease at less than market value.  
3.4 Community Rent Rebates
Following a change introduced on 23 March 2005, the Council moved away from
agreeing nominal rents and instead set rents at commercial levels, with VCOs able to
apply for a discretionary limited life rental grant or rent rebate. Under these
arrangements, the rebate ceases when the scheduled rent review takes place, at which
point the VCO may reapply for a continuation of the rent rebate. On the expiry of the
lease, the tenant may either negotiate a new commercial lease or apply under the CAT
scheme for a new lease at less than market value.  On 4 November 2025, the
Committee approved an amendment to the Council’s existing policy allowing VCOs to
submit a rent rebate application out with the scheduled rent review timescale where
unforeseen circumstances arise (para 17 of the minute refers). Each request will be
considered on a case-by-case basis.  
3.5 APPENDIX II lists the leases currently benefiting from a rent rebate. When each lease
ends, any subsequent request for rental support will be assessed through the CAT
scheme. Total rental support awarded under these arrangements during the 2025/26
financial year amounted to £21,725, comprising £12,625 from the General Fund,
£2,700 from Common Good, and £6,400 from Public Trusts.  
3.6 Short-Term Low-Value Rental Concessions
On 12 May 2021, the Council delegated authority to the Chief Financial Officer to
approve applications for short-term, low-value concessionary rental arrangements to
facilitate a light touch process and enable a quick response (para 16 of the Minute
refers). Where rebate values reach the delegated thresholds, any further applications
must be referred to committee for determination.  
3.7 APPENDIX III sets out the leases benefiting from rent rebates approved under
delegated authority. No applications for short-term, low-value rental support were
received during the 2025/26 financial year.  
4.  SUMMARY OF IMPLICATIONS  
4.1 The table below shows whether risks and implications apply if the recommendations
are agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) X 
Policy and Legal X 
Page 264

Page 265

Financial  X
Risk  X
Staffing  X
Best Value and Transformation  X
Property  X
Information Communications Technology/Digital             X
Equalities. Social Inclusion and Economic Impact                 X 
4.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following
Council Plan strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☐ Improving wellbeing of our population
Where a property is held on a Common Good title, the interests of the inhabitants
of the former burgh will take precedence over the Council’s Corporate Plan and the
Local Outcomes Improvement Plan (LOIP). 
Where the property is held under a Public Trust, it is burdened with the trust
purposes.  Consequently, any application for financial support must be considered
only in relation to these purposes.   
4.3 Policy and Legal
On 21 March 2017, the Policy and Resources Committee approved the following policy
statement in relation to Community Asset Transfers (para 5 of the Minute refers).
“Moray Council recognises the important role that the transfer of property assets can
play in empowering communities and strengthening their resilience.  Where
appropriate, the Council will use the transfer of assets to give more control to
communities and local people, inspire them to find local solutions to community
needs, and as a means of helping communities become more sustainable in the long
term.  In determining all asset transfer requests, the Council will have regard to the
guidance provided by the Scottish Government in relation to asset transfer requests
made under Part 5 of the Community Empowerment (Scotland) Act 2015, whether or
not such requests are made under the provisions contained in the Act.” 
Page 265

Page 266

When assets are leased at less than market value, the arrangement must comply with
the Disposal of Land by Local Authorities (Scotland) Regulations 2010.  These
regulations require the Council to be satisfied that the arrangement is reasonable and
that it is likely to contribute to at least one of the following purposes: 
a) Economic Development,
b) Regeneration,
c) Public Health,
d) Social Wellbeing, or
e) Environmental Wellbeing.
Reasonableness in this context is taken to imply that the requested discount is the
minimum necessary to allow the projected benefits to be realised and that it is
proportionate to the costs and benefits. 
In administering Common Good assets, the Council is required by section 15(4) of the
Local Government etc. (Scotland) Act 1994 to have regard to the interests of the
inhabitants of the area to which the Common Good related prior to 16 May 1975.
Where the Council Members act as Trustees under a Public Trust, they are not acting in
the capacity of a local authority but in their capacity as Trustees under and in terms of
the Trust. 
The Subsidy Control Act 2022 came into effect on 4 January 2023, replacing the
previous State Aid provisions.  The Act can apply whenever the Council sells or leases a
property at less than market value, provided that the conditions for a subsidy are met. 
In particular, the beneficiary must constitute an ‘enterprise’ due to its activities
involving the offering of goods or services.  Section 7(2) of the Act provides that an
activity is not to be regarded as an economic activity if or to the extent that it is carried
out for a purpose that is not economic.  If the activity is not for economic purposes,
then the body will not be considered an enterprise and any financial assistance
provided would not be considered a subsidy under the Act.  
4.4 Financial  
While there are no new financial implications arising directly from this report, the
Council continues to provide rental support to voluntary and community organisations
occupying Council property. As detailed in APPENDIX II, total rent rebates awarded
during the 2025/26 financial year amounted to £21,725, comprising £12,625 from the
General Fund, £2,700 from Common Good and £6,400 from Public Trusts.  
4.5 Risk 
There are no risk implications arising directly from this report.  
4.6 Staffing 
There are no staffing implications arising directly from this report.  
4.7 Best Value and Transformation 
There are no proposals relating to best value or transformation arising directly from this
report.  
4.8 Property 
There are no property implications arising directly from this report.
Page 266

Page 267

4.9 Information Communications/Technology/Digital 
There are no ICT improvements required or issues arising directly from this report.  
4.10 Equalities, Social Inclusion and Economic Impact   
Integrated impact assessments (IIA) are carried out for individual CAT applications to
identify, consider and mitigate any equality, human rights, the rights of children and
young people and socio-economic impacts. This ensures the transfers advance
equalities and improve inclusion within our communities.  An IIA was presented to this
Committee 4 November 2025 regarding the Community Rent Rebate policy change
which has now been signed off. 
4.11 Climate Change and Biodiversity Impacts 
There are no climate change or biodiversity implications arising from this report. 
5.  CONSULTATION  
5.1 This report has been prepared in consultation with the Executive Director for Education,
Housing and Communities, Head of Housing, Property and Communities, Chief Financial
Officer, Service Manager People Management, Service Manager Community Strategy and
Engagement, Service Manager Property, Estates and Assets, S. Souter, Senior Accountant,
Service Manager Legal Services, Service Manager Democratic Services and Equalities
Officer and any comments made have been incorporated into the report.  
6.  BACKGROUND PAPERS  
6.1 Held by author.
Page 267

Page 268

APPENDIX I
Legacy Arrangements – Properties Let at Nominal Rents Reflecting the Award of Financial Support as at 31 March 2026
Financial support can be provided through the Council retaining responsibility for specified property costs, agreeing to forego rent that it could
otherwise charge, or a combination of both.  The table below only includes cases involving the provision of financial support.  Most leases
involve the tenant taking on full responsibility for all property costs, including repairs and maintenance – these lease types are designated by
the letters FRI (full repairing and insuring).  In some cases, the tenant is responsible for internal repairs only – these are denoted by the letters
IRO.  Where properties were let at nominal rents a new valuation would be required to identify the current value of the rental concession.  The
majority of these leases contain no provision for reviewing the rent, so can only be reviewed when the lease is terminated.  The list is grouped
by title, i.e. General Fund, Common Good and Public Trust, and then sorted by expiry date with the earliest dates at the top. 
Location Community Body Property Lease
Type
Date of
Entry
Term Expiry Annual
Rent
Next Review 
General Fund
1.  Forres  Forres Thistle FC Logie Park,
Pilmuir Road
FRI 01/06/1988 50 years 01/06/2038 £10.00 Lease end
2.  Mosstodloch  Mosstodloch Amenities
Association
Site of Speymouth Hall,
Stynie Road
FRI 15/03/1977 99 Years 14/03/2076 £0.01 Lease end
3.  Lhanbryde  Lhanbryde Community
Challenge
Site of Village Hall,
Robertson Road
FRI 11/11/1977 99 years 11/11/2076 £0.01 Lease end
4.  Portgordon  Portgordon Recreation
Committee
Bowling Green,
Station Road
FRI 01/09/1978 99 years 01/09/2077 £0.01 Lease end
5.  Fochabers  Fochabers Rifle Club 13 Christie Place FRI 28/05/2006 99 years 28/05/2105 £1.00 Lease end 
Common Good
6.  Buckie  Buckie Victoria Bowling
Club
Bowling Club,
West Church Street
FRI 01/04/2005 25 years 31/03/2030 £1.00 Lease end
Page 268

Page 269

Location Community Body Property Lease
Type
Date of
Entry
Term Expiry Annual
Rent
Next Review
7.  Forres  Forres Bowling Club Forres Bowling Club,
St. Catherines Road
FRI 07/07/1995 99 years 06/07/2094 £1.00 Lease end 
Public Trust
8.  Aberlour  Aberlour Community
Association (Note 1)
Fleming Hall,
Queens Road
IRO 01/04/2001 25 years 31/03/2026 £1.00 01/04/2026
or lease end
Notes
1. The Fleming Hall trust has no funds.  The Council is currently responsible for keeping the hall wind and watertight, resulting in a net cost to the Council. 
The rent payable for the hall was initially set at £1 (if asked) but with a provision for quinquennial rent reviews.  The rent review clause contains
provision for determining whether the rental concession should continue.  The tenant has benefited from this provision throughout the tenancy with
the result that there is no income generated by the lease.  The trust deed does not permit the trustees to retain any surplus income from the property. 
When the lease is due to be renewed it will be offered on FRI terms and conditions.  
Page 269

Page 270

APPENDIX II
Community Rent Rebates as at 31 March 2026
Most of the leases listed involve the tenant being fully responsible  for all property costs, including repairs and maintenance.  The list is
grouped by title, i.e. general fund, common good and public trusts, and sorted by earliest rent review date. 
Location Community Body Property Date of
Entry
Expiry Date Annual
Rent
Rebate
Awarded
Rent
Payable
Review
Cycle
Next Rent
Review Date 
General Fund
1.  Keith Keith Golf Club Land at Keith Golf
Club, Fife-Keith
25/08/2009 25/08/2108 £5,040 £5035 £5 5 years 01/09/2028
2.  Keith  2nd Keith Scout
Group
Old Ogilvie School,
Fife Street
31/10/2015 30/10/2035 £5,790 £5,790 £0 5 Years 31/10/2025
3.  Findochty  Findochty Bowling
Club
Findochty Bowling
Green
18/05/2006 17/05/2031 £400 £400 £0 5 Years 18/05/2026
4.  Buckie  Buckie Skate Park
Committee
Skate Park,
Ian Johnston Park
27/09/2008 26/09/2028 £1,400 £1,400 £0 5 Years 27/09/2028
(lease end) 
Total Values for General Services £12,630 £12,625 £5 
Common Good
5.  Buckie  Fishing Heritage
Centre (note 1)
Fishing Heritage
Centre
01/03/2006 28/02/2036 £2,700 £2,700 £0 3 Years 15/05/2027 
Total Values for Common Good £
2, 700
£
2,700
£0 
Public Trusts
6.  Forres  Grant Park Pavilion
Committee
Bowling Pavilion,
Grant Park
03/11/2008 02/11/2048 £6,300 £6,300 £0 3 Years 03/11/2026
7.  Elgin  Bowling Club
(note 3)
Bowling Pavilion,
Cooper Park
01/04/2008 31/03/2028 £100 £100 £0 None 01/04/2028
(lease end) 
Total Values for Public Trusts £6,400 £6,400 £0 
Page 270

Page 271

Location Community Body Property Date of
Entry
Expiry Date Annual
Rent
Rebate
Awarded
Rent
Payable
Review
Cycle
Next Rent
Review Date 
All Ownership Categories 
Total Values for all ownership categories £29,890 £ 21,725 £4,500 
Notes.
1. On 23 April 2024, the Corporate Committee agreed to renew the 100% community rent rebate for a further period of 3 years to 15 May
2027 (paragraph 16 of the draft Minute refers). 
2. On 4 November 2025, the Corporate Committee agreed to award Keith Golf Club a Community Rent Rebate of £5,035 per annum,
backdated to 31 March 2025, for a period of one year. It was also agreed that the rebate would be reviewed annually, provided that Keith
Golf Club submits the required financial reports to support any future award.  If this information is not provided, the rent rebate will cease
and full rent will be due until the next 5-yearly review. 
Page 271

Page 272

APPENDIX III
Concessionary Rentals of Low Value or Short Duration Approved under Scheme of Delegation as at 31 March 2026
The default position where rent rebates are awarded under delegated powers is that the tenant must accept full responsibility for all property
costs, including all repairs and maintenance of the property concerned.  These are indicated by the letters FRI. 
Location Community Body Property Lease
Type
Date of
Entry
Term Expiry Rental
Value
Rebate
Value 
General Fund
9.  Burghead  Burghead and
Cummingston Community
Council (note 1)
Site of Community
Shelter, Burghead
Harbour
FRI 14/03/2008 20 years 13/03/2028 £175 pa £175 pa
Notes
2. The rent rebate awarded to the Community Council took effect from 14 March 2021. 
Page 272

Page 273

Report to: Corporate Committee Meeting Date: 26 May 2026  
Report by: Executive Director  Education, Housing and Communities      
Author: Emma Dawson Contact Email: emma.dawson@moray.gov.uk 
Subject: Information Report: Community Asset Transfers Annual Report 
1.  PURPOSE 
1.1  The purpose of this report is to meet the reporting requirements of section 95 of the
Community Empowerment (Scotland) Act 2015 in relation to asset transfer requests.  
1.2  This report is submitted to Committee in terms of Section III (B) 32 of the Council’s
Scheme of Administration relating to the consideration of Community Asset Transfer (CAT)
requests.  
2.  SUMMARY  
2.1  Section 95 of the Act requires each authority to publish an asset transfer report by the end
of June each year. This report covers the period 1 April 2025 to 31 March 2026. There were
no formal asset transfer requests received during the reporting year, and Officers dealt
with four expressions of interest.   
3.  BACKGROUND AND CONTEXT  
3.1 The CAT Scheme supports the transfer of Council-owned land and buildings to
community-controlled bodies. The Council has an established history of empowering
communities through the transfer of assets, including ownership transfers, leases, and
management agreements.  
3.2 Part 5 of the Community Empowerment (Scotland) Act 2015 provides eligible
community-controlled bodies with the right to request asset transfers from public
authorities. In line with the Act, authorities are required to assess requests transparently
against defined criteria and to approve them unless there are justified grounds for refusal.  
3.3 There is no legal requirement for all asset transfer requests to be submitted under the Act.
However, for transparency and completeness, details of requests received out with the Act
are also included in the annual report, which is attached as APPENDIX I.
☐ For Decision      ☒  For Information
Page 273

Page 274

3.4 During the period 1 April 2025 to 31 March 2026, no asset transfer requests were received.
There were no validated requests awaiting a decision as at 31 March 2026, and no
decisions were subject to review or appeal during the reporting year.  
3.5 Officers have received four Expressions of Interest (EOIs) during the reporting period, all of
which remain active. These figures do not include enquiries that had not yet progressed to
the formal EOI stage. There is no requirement for cases to begin with an EOI, and
community groups may choose to submit a formal asset transfer request at any time.  
3.6 The Council’s Community Support Unit (CSU) offers capacity-building support to
community groups throughout every stage of the CAT process. CSU Officers undertake an
initial assessment of all groups submitting an EOI, considering whether the group has the
skills and experience required to take on an asset and reviewing any community
engagement carried out to date. This assessment allows officers to identify and address
any issues with the group as needed. A further assessment is completed when a formal
asset transfer request is submitted.  
4.  SUMMARY OF IMPLICATIONS 
4.1 The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) X 
Policy and Legal X 
Financial  X
Risk  X
Staffing  X
Best Value and Transformation  X
Property  X
Information Communications Technology/Digital             X
Equalities. Social Inclusion and Economic Impact                 X 
Climate Change and Biodiversity Impact  X 
4.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
Page 274

Page 275

☐ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☐ Improving wellbeing of our population 
4.3 Policy and Legal 
On 21 March 2017, the Policy and Resources Committee approved the following policy
statement in relation to Community Asset Transfers (para 5 of the Minute refers).
“Moray Council recognises the important role that the transfer of property assets can play
in empowering communities and strengthening their resilience.  Where appropriate, the
Council will use the transfer of assets to give more control to communities and local
people, inspire them to find local solutions to community needs, and as a means of
helping communities become more sustainable in the long term.  In determining all asset
transfer requests, the Council will have regard to the guidance provided by the Scottish
Government in relation to asset transfer requests made under Part 5 of the Community
Empowerment (Scotland) Act 2015, whether or not such requests are made under the
provisions contained in the Act.” 
When assets are transferred at less than market value, the disposals must comply with the
Disposal of Land by Local Authorities (Scotland) Regulations 2010.  These regulations
require the Council to be satisfied that the transfer is reasonable and that the disposal is
likely to contribute to at least one of the following purposes: 
a) Economic Development,
b) Regeneration,
c) Public Health,
d) Social Wellbeing, or
e) Environmental Wellbeing. 
Reasonableness in this context is taken to imply that the requested discount is the
minimum necessary to allow the project to proceed and that it is proportionate to the
costs and benefits of the project. 
The Community Empowerment (Scotland) Act 2015 only applies to the Council when
acting in its capacity as a local authority.  Where the Council Members act as Trustees
under a Public Trust, they are not acting in the capacity of a local authority but in their
capacity as Trustees under and in terms of the Trust.  Consequently, the Act confers no
rights on community-controlled bodies in relation to Public Trust assets. 
The Subsidy Control Act 2022 came into effect on 4 January 2023, replacing the previous
State Aid provisions.  The Act can apply whenever the Council sells or leases a property at
less than market value, provided that the conditions for a subsidy are met.  In particular,
the beneficiary must constitute an ‘enterprise’ due to its activities involving the offering of
goods or services.  Section 7(2) of the Act provides that an activity is not to be regarded as
an economic activity if or to the extent that it is carried out for a purpose that is not
economic.  If the activity is not for economic purposes, then the body will not be
considered an enterprise and any financial assistance provided would not be considered a
subsidy under the Act.  
4.4 Financial
Page 275

Page 276

There are no financial implications arising directly from this report.  
4.5 Risk 
There are no risk implications arising directly from this report.  
4.6 Staffing 
There are no staffing implications arising directly from this report.  
4.7 Best Value and Transformation 
There are no proposals relating to best value or transformation arising directly from this
report.  
4.8 Property 
There are no property implications arising directly from this report.  
4.9 Information Communications/Technology/Digital 
There are no ICT improvements required or issues arising directly from this report.  
4.10 Equalities, Social Inclusion and Economic Impact 
An equalities/socio-economic impact assessment is not required.  It should however be
noted that voluntary community groups or private sector organisations may also be
subject to the public sector equality duty (PSED) under the Equality Act 2010 if they meet
certain criteria including:
• they receive public funding;
• are contracted by public bodies to deliver services;
• are acting in the public interest;
• are providing a public service.  
4.11 Climate Change and Biodiversity Impacts 
There are no climate change or biodiversity implications arising from this report. 
5.  CONSULTATION  
5.1 This report has been prepared in consultation with the Executive Director for Education,
Housing and Communities, Head of Housing, Property and Communities, Chief Financial
Officer, Service Manager People Management, Service Manager Community Strategy and
Engagement, Service Manager Property, Estates and Assets, S. Souter, Senior Accountant,
Service Manager Legal Services, Service Manager Democratic Services and Equalities
Officer and any comments made have been incorporated into the report.   
6.  BACKGROUND PAPERS  
6.1 Held by author.  
Page 276

Page 277

COMMUNITY ASSET TRANSFER 
ANNUAL REPORT 
1 APRIL 2025 to 31 MARCH 2026 
APPENDIX I
Page 277

Page 278

Contents Page  
Introduction 3  
Promotion and support 3  
Asset Transfer Requests 5  
Simplified Arrangements 6  
Contact Us 6  
Appendix 1 7  
Appendix 2 9 
Page 278

Page 279

INTRODUCTION
From 23 January 2017, the Community Empowerment (Scotland) Act 2015 (the Act) introduced a formal
right for eligible community bodies to submit asset transfer requests to public authorities. These requests
may relate to any land or buildings owned or leased by the authority. Under the Act, public authorities
must agree to the request unless there are reasonable grounds to refuse it.
Section 95 of the Act also requires each authority to publish an annual report detailing the number of
asset transfer requests received and processed during the year, along with information on the steps taken
to promote asset transfer opportunities and support community bodies through the process. While not
all asset transfer requests must be made under the Act, this report includes information on requests
handled both within and out with the statutory framework, to ensure transparency and completeness.
PROMOTION AND SUPPORT
Between 1 April 2025 and 31 March 2026, the following actions have continued to further promote and
strengthen the Community Asset Transfer (CAT) process.
Empowering Communities
Community empowerment is the process of helping communities gain greater influence and control over
the decisions and circumstances that affect their lives. A community can be any group of people
connected by shared interests, concerns, or identities. Empowerment focuses on enabling these groups
to take charge of the factors that shape their wellbeing and future.
Moray Council has long recognised that transferring property assets can significantly enhance
community empowerment and resilience. The Council’s Community Asset Transfer Scheme supports its
Corporate Plan priority of building thriving, resilient and empowered communities, as well as the Local
Outcomes Improvement Plan priority of empowering and connecting communities. Where appropriate,
the Council uses asset transfers to give communities more direct control, encouraging them to develop
local solutions to community needs and to become more sustainable in the long term. 
Page 279

Page 280

Supporting Communities
The Council’s Community Support Unit (CSU) provides capacity building support to all community
groups engaged in the Community Asset Transfer (CAT) process. Officers from the CSU carry out initial
assessments of groups submitting an expression of interest, to establish whether the group has the
skills, experience and organisational resilience needed to take on an asset. This assessment also
reviews the group’s community engagement activity. Based on the outcomes, CSU officers work with
groups to address any issues identified, such as governance, consultation, or business planning. The
same level of support is available to groups using the simplified arrangements covered by the CAT
scheme. 
Officers from the CSU encourage groups to consider the requirements of those most in need in their
community.   To support this, the CSU works with the Council’s Research and Information Officers to
provide relevant data and statistical information that helps groups understand local demographics and
community needs. The CSU also works with external partners who can offer further assistance to groups,
including the Development Trusts Association Scotland’s Community Ownership Support Service (COSS)
and Highlands and Islands Enterprise (HIE). HIE has provided funding to enable community groups to
commission options appraisals and a Social Return on Investment report to support potential CATs.
Continuous Action
The Council’s dedicated Community Asset Transfer Team continues to manage and respond to all
enquiries related to Asset Transfers.
The Council’s website includes a comprehensive Community Asset Transfer section, providing guidance
on the CAT process, application forms, examples of successful CAT transfers in Moray, and useful links to
Scottish Government guidance, legislation, and other relevant resources. A dedicated mailbox is also
available for CAT related enquiries.
Communities can also access information about the Council’s land and property assets through it’s
map-based Asset Register. The full register can be viewed, searched, or downloaded via the Council’s
Open Mapping Data Portal. 
Open Mapping Data Portal
https://data-moray.opendata.arcgis.com/ 
Page 280

Page 281

ASSET TRANSFER REQUESTS 
This report covers the period from 1 April 2025 to 31 March 2026.   Throughout this time, no asset
transfer requests were received.  There were also no validated requests awaiting a decision, and no
decisions were subject to review or appeal during the reporting period. 
Asset transfers successfully completed since the Act came into effect in January 2017 are listed in
Appendix 1. 
Keith’s Longmore Hall, held by the Council as part of the Longmore Trust, has been operated by Longmore
Community Hall SCIO under a short-term lease since July 2018, following the Council’s decision to seek
a community organisation to manage the facility. The SCIO’s application for a longer-term lease was
approved in November 2023, with the new lease completed on 13 March 2025 and formally registered on
3 June 2025. This transfer was finalised through negotiation out with the Act. 
The Council is currently progressing three additional approved transfers comprising one within and two
out with the Act, as outlined below. A decision on a further request has been deferred pending
investigation of an alternative site, as detailed in Appendix 2. 
Approved Transfers 
Lossiemouth’s Coulardbank Playing Fields are held by the Council on an inalienable Common Good title.
In January 2020, the Lossiemouth Community Development Trust submitted an asset transfer request
under the Act seeking a 25-year lease of part of the playing fields to develop a skate park. In October of
the same year, the Council approved the request, subject to obtaining court consent and the Trust
securing the required planning permission for the development. Court decree was granted on
12 January 2021, and planning consent followed on 21 March 2024, enabling the lease to proceed. The
lease is now in the process of being completed. 
Land next to Clovenside Cemetery in Forres, held by the Council on a Common Good title, was leased to
a head tenant in 2002, who subsequently sub-let the site to Forres Baptist Church. When the head tenant
indicated a wish to end the tenancy, Forres Baptist Church submitted an application seeking ownership
of the land and the associated building, Clovenside Funeral Home. The Council approved the application
on 4 November 2025, subject to agreement on the assignation of the tenant’s interest. The transfer is now
progressing towards completion through negotiation out with the Act. 
Forres in Bloom have been occupying the Council owned Grant Park Depot in Forres as their main
operational hub and horticultural nursery under an informal arrangement for several years. The SCIO’s
application for a formal long-term lease was approved on 4 November 2025, and the transfer is also being
finalised through negotiation out with the Act. 
Expressions of Interest 
The Council’s CAT Scheme operates as a two-stage process. Community bodies are encouraged to begin
with the pre-application stage by submitting an Expression of Interest (EOI) for any land or buildings they
wish to acquire.  Once an EOI is received, the Council’s CAT Team will: 
Page 281

Page 282

• confirm the community body’s eligibility under the scheme,
• check that the Council is able to transfer the relevant property rights,
• identify the Council’s current and future operational requirements for the property,
• identify, as far as possible, any other material considerations relevant to a potential asset
transfer, and
• exchange information about the community body, the asset, and the potential transfer. 
The EOI stage is intended to help community bodies avoid abortive work and develop a strong business
case in support of a formal asset transfer request. Not all community bodies that submit an EOI will
progress to a formal request, and some may choose to proceed directly without completing an EOI.
During the reporting period, the Council considered five EOIs, all of which remain current. 
SIMPLIFIED ARRANGEMENTS 
The Council’s former Community Rental Grant Scheme has been incorporated into the CAT Scheme.
Under the expanded scheme, voluntary and community organisations leasing Council property may
apply for a Community Rent Rebate when their rent is due for review.  On 4 November 2025, the Council
amended its policy to allow VCOs to submit rent rebate applications out with the usual review
timescale in unforeseen circumstances. Each request will be assessed individually.  As this element is
not governed by Community Empowerment legislation, all applications are assessed entirely at the
Council’s discretion and must be supported by a strong business case demonstrating ongoing benefits
that justify the rebate. 
In response to the pandemic, there was a rise in requests from voluntary and community organisations
seeking short-term use of temporarily unoccupied Council assets. These requests often require rapid
decisions, which are not always compatible with committee timescales. To ensure an appropriately
proportionate approach, a simplified process is now available for organisations seeking short-term or
low-value concessionary leases. 
CONTACT US 
Further information on the scheme is available from the Council’s CAT team or the Community Support
Unit (CSU). 
Post: Moray Council, High Street, Elgin IV30 1BX    
Phone: 01343 543451      
Email: CAT@moray.gov.uk | CSU@moray.gov.uk    
Web: http://www.moray.gov.uk/CAT 
Page 282

Page 283

Appendices 
Appendix1
The assets listed below were transferred prior to the current reporting year, but all after Part 5 of the Community
Empowerment (Scotland) Act 2015 took effect on 23 January 2017. No asset transfers were completed between 23 January
2017 and 31 March 2017. 
Table 1. Asset transfers completed from 1 April 2024 to 31 March 2025 
Property Community Body Type 2015 Act Transferred
Longmore Hall, Keith Lossiemouth Community
Development Trust
Lease No 13/03/2025 
Table 2. Asset transfers completed from 1 April 2023 to 31 March 2024 
Property Community Body Type 2015 Act Transferred
Fishermen’s Hall, Buckie Fishermen’s Hall Trust Ownership Yes 19/05/2023 
Table 3. Asset transfers completed from 1 April 2022 to 31 March 2023 
Property Community Body Type 2015 Act Transferred
Findochty Town Hall Findochty Town Hall
(SCIO)
Ownership Yes 21/07/2022
West Dunes Toilets, Findhorn Findhorn Village
Conservation Company
Ownership Yes 12/10/2022
Garmouth Water Tower Garmouth and Kingston
Community Association
Ownership No 19/12/2022
Table 4. Asset transfers completed from 1 April 2021 to 31 March 2022 
Property Community Body Type 2015 Act Transferred
Cullen Community and
Residential Centre
Three Kings Cullen
Association
Ownership Yes 05/11/2021 
Table 5. Asset transfers completed from 1 April 2020 to 31 March 2021 
Property Community Body Type 2015 Act Transferred
Dufftown Sports and Community
Centre
Dufftown Community
Centre (SCIO)
Ownership No 05/03/2021
Forres Town Hall Forres Area Community
Trust
Ownership Yes 26/02/2021
Land, Lesser Borough Briggs,
Elgin
Elgin Sports Community
Trust
Lease Yes 23/11/2020
Page 283

Page 284

Table 6. Asset transfers completed from 1 April 2019 to 31 March 2020
Property Community Body Type 2015 Act Transferred
Portknockie Bowling Green Portknockie Bowling and
Tennis Club
Ownership No 08/11/2019
Marine Park, Lossiemouth Action Marine Park Ownership No 05/06/2019   
Table 7. Asset transfers completed from 1 April 2018 to 31 March 2019 
Property Community Body Type 2015 Act Transferred
Cabrach School and Community
Hall
Cabrach Trust Ownership No 24/10/2018
Abbeylands School, Kinloss Morayvia Ownership No 05/10/2018   
Table 8. Asset transfers completed from 1 April 2017 to 31 March 2018 
Property Community Body Type 2015 Act Transferred
Tomintoul Bowling Green Tomintoul and Glenlivet
Bowling Club
Ownership No 25/05/2017
Tomintoul Youth Hostel Tomintoul and Glenlivet
Development Trust
Ownership No 19/04/2017
Tomintoul Museum Tomintoul and Glenlivet
Development Trust
Ownership No 19/04/2017 
Page 284

Page 285

Appendix 2 
The following  assets  are  awaiting  completion  or  are  currently  deferred  pending a Council decision. 
Table 1. Approved Asset Transfer Requests Awaiting Completion 
Property Community Body Request 2015 Act Approved
Land, Coulardbank Park,
Lossiemouth 
Lossiemouth Community Development Trust Lease Yes 06/10/2020
Land adjacent to
Clovenside Cemetery,
Forres
Forres Baptist Church Ownership No 04/11/2025
Former Depot and land at
Grant Park, Forres
Forres In Bloom Lease No 04/11/2025 
Table 2. Deferred Asset Transfer Requests 
Property Community Body Request 2015 Act Deferred
Land, Grant Park, Forres Forres Skate Park Initiative Lease No 27/09/2023 
Page 285

Page 286

Page 286