Democracy Spraffa

Agenda Document Pack - Corporate Committee - 10/06/2025

Moray Council · 10 June 2025
Back to Corporate Committee — 10 June 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Corporate Committee
Tuesday, 10 June 2025
NOTICE IS HEREBY GIVEN that a Meeting of the Corporate Committee is to be
held at Council Chambers, Council Office, High Street, Elgin, IV30 1BX on
Tuesday, 10 June 2025 at 09:30.
BUSINESS
1. Sederunt
2. Declaration of Group Decisions and Members Interests *
3. Resolution
Consider, and if so decide, adopt the following resolution:
"That under Section 50A (4) and (5) of the Local Government
(Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Item 16 of business
on the grounds that it involves the likely disclosure of exempt
information of the class described in the relevant Paragraphs of Part 1
of Schedule 7A of the Act.”
4. Minute of meeting of 22 April 2025 7 - 10
5. Written Questions **
6. Best Value Action Plan Review
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
11 - 36
7. Corporate Risk Register April 2025 Update
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
37 - 64
Page 1

Page 2

8. Transformation Strategy Development
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
65 - 84
9. Performance Report (Financial Services) - Period to
March 2025
Report by the Depute Chief Executive (Economy, Environment and
Finance)
85 - 92
10. Financial Services Service Plan 2025-28
Report by the Depute Chief Executive (Economy, Environment and
Finance)
93 -
102
11. Performance Report (Governance Strategy and
Performance) - Period to March 2025
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
103 -
110
12. Performance Report (HR ICT OD) - Period to March 2025
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
111 -
120
13. HR ICT and Organisational Development  and
Governance Strategy and Performance Service Plans
2025-28
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
121 -
146
14. Succession Planning
Report by Depute Chief Executive (Education, Communities and
Organisational Development)
147 -
178
15. Information Reports - if called in
16. Amendment to Out of Hours Business Case [Para 1 and
6]
• 1. Information relating to staffing matters;
• 6. Information relating to the financial or business affairs of any
particular person(s);
Page 2

Page 3

Item(s) which the Committee may wish to consider with
the Press and Public excluded
Information Reports - Not for Discussion at this Meeting
Any member wishing to call in a noting or information report from one
meeting shall give notice to Committee Services at least 48 hours
before the meeting for which the report is published. The Notice shall
be countersigned by one other elected member and shall explain the
reason for call in including any action sought.
Information Report - Community Asset Transfers Annual
Report
Report by the Depute Chief Executive (Economy, Environment and
Finance)
179 -
194
Information Report - Community Rental Support Annual
Review Report
Report by the Depute Chief Executive (Economy, Environment and
Finance)
195 -
204
Summary of Corporate Services Committee functions:
To regulate, manage and monitor the finances of the Council both
capital and revenue; to deal with staffing policies and practices other
than for teaching staff; to deal with equal opportunities policies and
practices; to deal with procurement policies and priorities; to deal with
all matters relating to the Council’s duty to initiate, maintain and
facilitate Community Planning; to ensure that the organisation,
administrative and management processes of the Council are designed
to make the most effective contribution to achieving the Council’s
objectives; to provide all central support services; to exercise the
functions of the Council in connection with the Registration of Births,
Deaths and Marriages; to deal with valuation and electoral registration
matters.
Page 3

Page 4

Watching the Meeting
You can watch the webcast live by going to: 
http://www.moray.gov.uk/moray_standard/page_43661.html
Webcasts are available to view for 1 year following the meeting.
You can also attend the meeting in person.  If you wish to attend
in person, please come to the High Street entrance door and a
member of staff will let you into the Chamber.
Page 4

Page 5

GUIDANCE NOTES
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how
the individual or members of the group will vote on any item(s) of business on
the Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting.
** Written Questions - Any Member can put one written question about any
relevant and competent business within the specified remits not already on the
agenda, to the Chair provided it is received by the Proper Officer or Committee
Services by 12 noon two working days prior to the day of the meeting.  A copy
of any written answer provided by the Chair will be published on the Council’s
committee management system by 4pm the day before the meeting.  The
Member who has put the question may, after the answer has been published,
ask one supplementary question directly related to the subject matter at the
meeting, but no discussion will be allowed.
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the
consent of the Chair. If a Member does not have the opportunity to put a
supplementary question because no time remains, then he or she can submit it
in writing to the Proper Officer who will arrange for a written answer to be
provided within 7 working days.
Page 5

Page 6

MORAY COUNCIL
Corporate Committee
SEDERUNT
Councillor Bridget Mustard  (Chair)
Councillor Kathleen Robertson  (Depute Chair)
Councillor Peter Bloomfield  (Member)
Councillor Theresa Coull  (Member)
Councillor John Cowe  (Member)
Councillor John Divers  (Member)
Councillor Amber Dunbar  (Member)
Councillor Jérémie Fernandes  (Member)
Councillor Sandy Keith  (Member)
Councillor Scott Lawrence  (Member)
Councillor Marc Macrae  (Member)
Councillor Paul McBain  (Member)
Councillor Shona Morrison  (Member)
Councillor Derek Ross  (Member)
Councillor Draeyk van der Horn  (Member)
Clerk Name: Tracey Sutherland
Clerk Telephone: 07971 879268
Clerk Email: committee.services@moray.gov.uk
Page 6

Page 7

MORAY COUNCIL
Minute of Meeting of the Corporate Committee
Tuesday, 22 April 2025
Council Chambers, Council Office, High Street, Elgin, IV30 1BX
PRESENT
Councillor Peter Bloomfield, Councillor Theresa Coull, Councillor John Cowe,
Councillor John Divers, Councillor Amber Dunbar, Councillor Jérémie Fernandes,
Councillor Sandy Keith, Councillor Scott Lawrence, Councillor Marc Macrae,
Councillor Paul McBain, Councillor Shona Morrison, Councillor Bridget Mustard,
Councillor Kathleen Robertson, Councillor Derek Ross, Councillor Draeyk van der
Horn
IN ATTENDANCE
The Chief Executive, Depute Chief Executive (Economy, Environment and
Finance), Chief Financial Officer, Head of Governance, Strategy and Performance,
Head of HR, ICT and Organisational Development, Acting Principal Trading
Standards Officer and the Democratic Services Manager.
1.         Chair
The meeting was chaired by Councillor Bridget Mustard.
2.         Declaration of Group Decisions and Members Interests
In terms of Standing Orders 21 and 23 and The Councillors' Code of conduct the
Council noted that there were no declarations for Group Leaders or Spokesperson
in regard to any prior decisions taken on how members will vote on any item on the
agenda or any declarations of Member's interests in respect of any item on the
agenda.   
3.         Resolution
The meeting resolved that in terms of Section 50A (4) and (5) of the Local
Government (Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Items 10 and 11 of business on
the grounds that it involves the likely disclosure of exempt information of the class.
Para Number of the Minute Para Number of Schedule 7a
13 Para 1
Information relating to staffing matters
4.         Minutes of meeting of 28 January 2025
The minute of the meeting of 28 January 2025 was submitted and approved.
5.         Written Questions
Item 4.
Page 7

Page 8

The Committee noted that no written questions had been submitted.
6.         Procurement Strategy Annual Review 2024-25
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) seeking approval of the 2024/25 annual review of the
Council's Procurement Strategy 2023-2026.
Following lengthy consideration the Committee unanimously agreed to:
i) note the changes to the Strategy as set out in section 5 of this report; and
ii) approve the Procurement Strategy for 2023-2026 as amended following the
review.
7.         Regulation of Investigatory Powers (Scotland) Act 2000 (RIPSA)
Annual Report and Revised Authorisation Policy and Procedure
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking the Committee to note the use made of covert
surveillance and the acquisition of communications data by Council employees in
the course of their duties over the reporting period and to also seek approval of the
Revised RIPSA Authorisation Policy and Procedures.
Following consideration the Committee unanimously agreed to:
i) note the use of covert surveillance by Council employees in the course of
their duties from 1 January to 31 December 2024;
ii) note the acquisition of communications data by Council employees in the
course of their duties from 1 January to 31 December 2024; and
iii) approve the revised RIPSA Authorisation Policy and Procedure at Appendix
1.
8.         Workforce Working Group Concluding Report
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing the Committee of the
progress made by the Workforce Working Group and its recommendations to
Committee.
Following consideration the Committee unanimously agreed:
i) to note the progress made by the Workforce Working Group; and
ii) that the remit from Corporate Committee has been discharged and that the
Group be brought to a close.
9.         Interim Workforce Planning Report
Page 8

Page 9

The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing the Committee of the
progress made against the production of data and plans to support effective
workforce planning across the council. The interim report, as requested by the
Short Life Workforce Working Group, is being presented mid-year, ahead of the
annual workforce report in August 2025 to ensure that Committee remain sighted
on the key issues arising from the data collated. This will enable and support
effective decision making and additionally provide assurance of the progress being
made. 
Following consideration, the Committee unanimously agreed to note:
i) the main elements of the workforce planning process and progress made; and
ii) the main elements of the Equalities and Mainstreaming Report.
10.         Employment Policy Framework 2024-2025
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) asking the Committee to consider
and approve the updated on the employment policy framework for 2024-25.
Following consideration the Committee unanimously agreed to:
i) approve the changes to the Fire Safety Policy.  This policy has been
updated to enhance its use, application and effectiveness in outlining the
responsibilities as regards Fire Safety and to align with best practice;
ii) Approve the change to the Politically Restricted Posts policy. This policy
has been updated to make more user friendly with regards to language
used, adding of hyperlinks which ease navigation, clarified the maintenance
arrangements of the Politically Restricted register and clarified
arrangements for those standing for election; and
iii) Approve the additions to the Maternity Leave Policy, Maternity Leave
(Teachers) Policy, Adoption, Surrogacy and Kinship Care Policy and
Paternity/Maternity/ Adoption Support Policy to accommodate the day one
right to 12 weeks leave and any pay, if eligible, if a child is receiving
neonatal care.
11.         Health and Safety Annual Report
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) asking the Committee to consider
and note the annual Health and Safety Report along with progress outlined and
approve proposed future actions.
Following consideration the Committee unanimously agreed to:
i) note the content of the annual health and safety report, as outlined in
Appendix 1 and the progress towards the outcomes established in the last
report; and
Page 9

Page 10

ii) approve the proposed future actions.
12.         Local Government Benchmarking Framework 2023-24 Results
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) presenting a corporate overview of
benchmarking performance data for the period 2023-24.
Following consideration, the Committee unanimously agreed to note the Council's
performance in terms of a corporate overview of benchmarking results.
13.         Future Workforce Report [Para 11]
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) seeking Committee support for the
proposed approach for modernising conditions of service and seek approval in
principle for further development including preparation for implementation of the
first strand.
Following lengthy consideration, the Committee unanimously agreed to:
i) note the context within which the proposals have been developed; and
ii) approve in principle the recommended approach.
Page 10

Page 11

Report to: Corporate Committee  Meeting Date: 10 June 2025  
Report by: Depute Chief Executive
(Education Communities
and Organisational
Development
Report No: DCE(ECOD)002/25  
Author: Denise Whitworth Contact
Email:
Denise.whitworth@moray.gov.uk 
Subject: Best Value Action Plan Progress Reporting 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to inform the Committee of progress against the actions set
out in the Council’s Best Value Action Plan since the last quarterly update on 28 January
2025.  
1.2  This report is submitted to Committee in terms of paragraph III B (41) of the Council’s
Scheme of Administration, Best Value being a cross-cutting issue that does not fall within
the remit of a particular committee.  
2.  SUMMARY  
2.1  This report outlines the progress made against the actions in the Council's Best Value
Action Plan since the last update. It highlights the key areas of progress and the actions
that require monitoring, emphasizing the importance of continuous improvement in
governance and resource management.  The report notes that from a total of 64 actions
within the Action Plan, 30 are completed, 19 are on target, 14 require monitoring, and 1
has yet to commence. 
2.2  Key Highlights include improvements in collaborative leadership and ongoing
transformation strategies where there has been significant progress.  However, 14 areas
are identified for close monitoring, including leadership development, partnership
working, and ICT developments, to ensure timely progress.   
Item 6.
Page 11

Page 12

3.  RECOMMENDATIONS – 
3.1  It is recommended that the Committee reviews and notes the progress made against
the actions in the Council’s Best Value Action Plan (Appendix 1).   
Denise Whitworth
Depute Chief Executive (Education Communities and Organisational Development) 
4.  BACKGROUND AND CONTEXT  
4.1  Councils in Scotland have a statutory duty to demonstrate Best Value, introduced in the
Local Government (Scotland) Act 2003.  Statutory Guidance defines Best Value as:   
Ensuring that there is good governance and effective management of resources, with a
focus on continuous improvement, to deliver the best possible outcomes for the public.  
4.2  In March 2020 the Scottish Government published refreshed Best Value
guidance requiring councils to demonstrate a focus on continuous improvement in
performance around seven themes: 
• Vision and leadership
• Governance and accountability
• Effective use of resources
• Partnerships and collaborative working
• Working with communities
• Sustainability
• Fairness and equality  
4.3  The Corporate Committee on 23 April 2024 agreed a new Best Value Action Plan that set
outs the Council’s priorities for the next 3 years to enable it to meet its Best Value duty
(paragraph 6 of the minute refers).  The Plan takes account of and supersedes the
consolidated list of improvement actions which bring together recommendations from a
number of sources in relation to the Council’s progress in achieving its Best Value duty and
the output from the Council-Wide Strategic Self-Assessment of Performance by both
Councillors and officers.  
4.4  The Committee also agreed that the Best Value Action plan will be monitored on a
quarterly basis and Appendix 1 provides the quarterly monitoring of the actions in the Plan
for January to March 2025.  As well as reporting to Committee, arrangements are in place
to ensure that the Corporate Leadership Team has regular oversight of performance
monitoring of progress on the actions in the plan to ensure that work is prioritised and
early remedial action can be taken if required.  
4.5  Progress is on target in implementing the actions in the Best Value Action plan with more
of the planned actions being concluded.  Overall, there 64 actions in total, of which 30 are
black (completed) actions, 19 green (on target), 14 amber (require monitoring), no reds
and 1 action that has yet to commence.  Key highlights in progress as noted as follows: 
Page 12

Page 13

I. Vision and Leadership: work on collaborative leadership has concluded and the
survey results in Appendix 2 to this report evidence improvement in this area. Work
continues in this area including joint workshops and events which build
relationships and joint working across political groups and with officers and
members and ensure a whole council perspective on key issues such as best value
and transformation.   
II. Public communication and engagement: the Council engagement strategy has
been implemented in relation to the general budget position as well as decisions of
the council on financial planning, including libraries consultation and was reported
to the council in February 2025. Relevant progress is reflected in Appendix 1
against the Vision and Leadership, Effective Use of Resources and Working with
Communities themes. 
III. Transformation Strategy work is progressing with the depots project due for
reporting and a workshop with members and senior officers in March to inform and
influence the next stage of future council transformation.  
4.6  The Best Value Action Plan sets out an ambitious programme of work and it is important to
maintain pace to ensure that targets are delivered.  As indicated in the appendix, while
overall progress is positive with 30 actions now completed, there are a small number (14)
areas that have been identified for close monitoring: 
I. Leadership development – action is being taken to progress a short term
programme of development and to ensure that individual development needs are
identified.  A draft strategic position has been prepared and the opportunity is now
being taken for the new Chief Executive to provide direction on some of the cultural
aspects that need to be part of this work. 
II. Partnership working – the absence of specific resource has been a barrier to
progress. This is an issue across partners and recent discussions have identified
some options to provide capacity which is being explored further in anticipation of
proposals coming forward in the New Year that will enable this work to come back
on track. 
III. ICT developments – there are a few amber actions relating to the demand for ICT
resources.  A recent decision by the Council to allocate additional resources will
improve this once recruitment to the positions is concluded. Meantime, the service
is prioritising work across various requirements to ensure priorities are addressed.  
4.7  Many of the actions in the report are coming to a conclusion with a number due for
completion over the next few weeks.  Some actions are identified for “Carry Forward”
where work will not be complete by June 2025 and some have been noted as “Continuing
Work” where planned actions have been concluded but the activity will continue as
business as usual and be reported in the normal way e.g. community engagement,
performance management (including PSIF). Highlights of actions due for this reporting
period are noted as follows: 
Page 13

Page 14

Vision and Leadership 
I. Leadership development – approach for leadership development to be finalised to
support the new management structure and plans put in place for the employee
engagement programme. 
Effective Use of Resources 
II. Transformation strategy – delivery or workshops to inform the next stage of the
development of the future council transformation programme. 
4.8  There are amendments to three planned target dates proposed within the update as
follows: 
BV 1: Vision and Leadership
i) the BV self assessment report is rescheduled from June to September to follow
on from the June workshop; and 
ii) the revised BV action plan will be reported in September (moved from April). 
Both have been adjusted to take dates away from the busy budget setting
calendar commitments
BV3: Resources
iii) the completion date for capital planning has been changed from 30 June 2025
to March 2026 to take account of the developing approach to capital planning 
4.9  Work has begun on the development of a refreshed Best Value Action Plan to continue the
Council’s improvement journey, which will be reported for approval in September 2025. 
This will take account of:
i) recommendations from external audit work during 2024/25; 
ii) remaining actions from the current BV Action plan, taking forward those that are
identified in Appendix 1 as “Carry Forward”;
iii) the outcome from the workshop held on 3 June 2025 with Councillors and
senior officers to undertake a self-assessment against the best value themes.  
5.  PROPOSALS  
5.1  It is proposed that the committee review and note the progress on the Best Value Action
Plan in Appendix 1.  
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) √ 
Policy and Legal  X
Financial  X
Risk  X
Staffing  X
Page 14

Page 15

Best Value and Transformation √ 
Property  X
Information Communications Technology/Digital             X
Equalities. Social Inclusion and Economic Impact              X
Climate Change and Biodiversity Impact             X 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
The Best Value Action Plan supports the Council to deliver the priorities in the corporate
plan and supports the council values of Improving: drive improvement; Ambitious: ensure
sustainable and efficient services; and Responsive: promote community participation
and involvement and involve our communities. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population 
6.3  Policy and Legal 
The Best Value Action Plan supports the Council to fulfil its statutory duty to demonstrate
Best Value, introduced in the Local Government (Scotland) Act 2003.  
6.4  Financial 
There are no specific financial implications, however, the Best Value Action Plan supports
the Council in its duty to make best use of resources and there are a number of specific
actions that relate to financial management that are moving forward. 
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend this
Year
Virement
From
Other
Comments
- - - - - - 
Annually Recurring Costs:
Page 15

Page 16

Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments
- - - - - - 
6.5  Risk 
There are risks associated with not making adequate progress on the actions set out in the
Best Value Action Plan.  The Council has had feedback from a number of external
stakeholders that identified areas for improvement and failure to address these through
the planned actions is likely to lead to adverse reporting and implications for the Council. 
Several of the Best Value themes feature on the Council’s Corporate Risk Register
including leadership, financial sustainability and workforce development.  Progressing the
actions in the Plan will also secure improvements in the management of these risks.  
6.6  Staffing 
There are no specific staffing implications arising from this report.  
6.7  Best Value and Transformation 
The implications are as set out in the report  
6.8  Property 
None.  
6.9  Information Communications/Technology/Digital 
None  
6.10  Equalities, Social Inclusion and Economic Impact 
This is covered in the Best Value inspection regime itself and the Council’s duty to deliver
best value.  
6.11  Climate Change and Biodiversity Impacts 
None 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with Extended CMT (E/CMT) have
contributed to the progress monitoring set out in Appendix 1 and any comments made
have been incorporated into the report  
8.  BACKGROUND PAPERS  
8.1  Corporate Committee report on Best Value Action plan 23 April 2024 (item 5a)
8.2  Corporate Committee report on 27August 2024 Best Value Action Plan (item 11)
8.3  Corporate Committee report on 5 November 2024 Best Value Action Plan (item 8)
8.4  Corporate Committee report on 28 January 2025 Best Value Action Plan (item 7) 
Page 16

Page 17

Appendix 1
Report Date April 2025 (Corporate Committee 10/06/2025)
BRAGG Status - KEY BLACK -
Completed
RED -
Concern
AMBER -
Caution
GREEN On
Target
GREY - Not
Started
Lead Officer Priority Delivery Date Schedule % Complete
BEST VALUE ACTION PLAN Aug-26 GREEN 70%
Mar-26 GREEN 82%
CEx/Council (CL) 1 Dec-24 AMBER 99%
DCE (ECOD) 3 Jun-25 GREEN 82%
H HR,ICT & OD 1 Dec-24 AMBER 90%
CEx / DCE (ECOD) 2 Mar-26 GREEN 42%
DCE (ECOD) 3 Jun-24 Complete 100%
Jan-25 GREEN 76%
HoGSP 3 Oct-24 Complete 100%
Cex 1 Jan-25 AMBER 80%
HoGSP E April 24 /  25* AMBER 78%
H HR,ICT & OD E Sept 25* AMBER 45%
1. Vision and Leadership
2. Governance and Accountability
1.1 Collaborative Leadership - ensuring members and officers work effectively to secure key
1.2  Community and Partner Engagement on Council priorities
1.3 Leadership Development Action
1.4 Continuous Improvement – implement self-evaluation.
2.1 Effective Scrutiny
1.5 Performance Reporting
2.3 Risk Management
2.4 Digital Resilience Management
Summary: 
Planned engagement and communication activity has been completed and reported as intended with reports to the council in February 2025.  The next stage of community engagement work is in development.  The outcome of
the collaborative leadership survey is being reported in June with the BV update. Other work in this theme  continues to progress well.  There are revised dates proposed for the BV self-assessment to move away from the budget
and year end timing and some work has been scheduled to enable input from the new Chief Executive.
Work progressed as planned on collaborative leadership with  a survey that was concluded on 14 February and a report is scheduled to Council in May (now corporate committee for June).  Community Planning Board considered
community engagement at a development session in October and identified opportunities for development to be taken forward in the new year as part of the approach to the LOIP. 
The proposals for Phase 1 of the corporate management structure have been approved by Council and formal consultation is in progress and now being led by the new Chief Executive who started in March.  A programme for the
delivery of leadership development will now be finalised and implemented from late  August 2025 once the new Team is in place.  
Implementation of self-evaluation to deliver continuous improvement is progressing with the re-activation of the PSIF process moving forward and planned work with the Improvement Service to support delivery.
The Council engagement strategy for financial planning has been implemented with information and engagement activity through October, November and December  for reporting to the council to inform and influence financial
planning in the new year .  All actions within this BV theme are currently on target.         
Conclusion: The majority of actions in theme BV1 are completed or well progressed and will be concluded by June 2025 as planned.  The actions relating to leadership development and performance score cards for services will
be carried forward to the next action plan.  Continuing work will be required on PSIF to support the council's self-assessment and continuous improvement activity and Community Engagement will also feature as an ongoing
area of development.
2.2 Sound Governance
Summary:
The 6 month review of scrutiny training is not yet due. Under the Risk Management project, the annual review of departmental risk registers that feed wider risks into Corporate Risk Register is complete as is the work on the
corporate overview of business continuity and resilience which was reported to committee in April 2024.Work on business continuity is progressing as planned. 
Work on digital resilience is progressing with the first stage of the Board level desktop exercise completed and preparation for the next phase of workforce training and awareness in the final stages of preparation.
Conclusion: Good progress has been made in strengthening governance with considerable improvement on the arrangements relating to financial planning with the MIJB leading to a more sustainable budget position for both
MIJB and the Council.  Actions relating to business continuity and resilience assessment and planning and cyber resilience will be carried forward.
Page 17

Page 18

Appendix 1
Aug-26 GREEN 85%
CEx / DCE (ECOD) 1 Aug-26 GREEN 64%
CEx 2 Sep-24 Complete 100%
CEx / DCE (EEF) / CFO 1 Dec-24 GREEN 91%
Oct-25 #REF! 32%
DCE (EEF / ECOD) 2 Oct-25 #REF! 32%
Jun-25 GREEN 55%
DCE (EEF / ECOD) 2 Jun-25 GREEN 55%
Sep-24 GREEN 60%
DCE (EEF) 3 Sep-24 GREEN 60%
3. Effective Use of Resources
4. Partnerships and Collaborative Working
3.3 Financial Management
3.2 Workforce Planning
3.1 Transformation and Sustainable Services
Summary: Community engagement is being considered that will advance the use of PB approaches in influencing across the whole of the council's financial planning and plans for transformation. 
Guide to mainstream PB developed by CSU and circulated to all services.  Consideration is being given to the use of online tools and website enhancement to support engagement.  Work to review the operation of the
Community Engagement Group has been completed and considered by the Group and was considered at the CPB development session in October 2024 where future approaches were identified.  These are being taken into
account in the proposals being developed for the CPB for the development of locality working. £109,000 via UK shared prosperity fund was allocated via PB to eligible arts, culture and heritage groups (July 24).  Progress is being
made in mainstreaming PB principles into the council's approach to financial planning.  Event scheduled for November 2024 as part of engagement work to encourage community influence was cancelled due to low sign up. 
Consideration is being given to how best to address this for future. Draft list of current PB type activity circulated to Heads of Service and will be used to guide future activity.        
Conclusions: The Council has well developed arrangements ion place for communication and engagement that have been followed through in relation to financial planning.  The next stage of community engagement will aim to
take forward the council's approach to mainstreaming PB to give community impact across its financial planning and services.
Summary: A report has been considered on locality planning to embed this further into the work of the CPP based on the outcomes of CPP development sessions.  However, there is limited progress in other areas of work on this
theme as work is managed by officers alongside their substantive remit with no specific CPP resource.  This remains a risk due to managing conflicting priorities.
Work with community planning partners is moving forward to develop shared priorities for the LOIP and there is early indicative support to develop a single Moray plan.  Locality plans are well developed and ongoing and
consideration is now planned of learning across partners and service areas to identify opportunities for learning and greater impact from partners working more closely.  There has been limited progress for Nov/Dec due to other
priorities, however, work continues on building on the positive work within the partnership in the approach to locality working.  Discussions are also taking place between partners on options to dedicate resources to partnership
work to enable more focussed action on Partnership Working for Moray in 2025 and it is hoped this will assist in taking forward planned developments.
Conclusions: There have been challenges in developing partnership working as while community planning partners have been willing and supportive, constraints on resourcing across all agencies has meant that it has not been
possible to allocate specific resources and conflicting priorities have made steady progress challenging.  This work is identified for carry forward with the exception of where the single agency work has concluded and the CPP has
been unable to resource progress in relation to the development of an approach to locality planning.
Summary: 
The review of the transformation boards has been completed and a single Council Transformation Board is now in place to ensure oversight of the whole Transformation programme of  work.  Projects continue to progress and
the depots full business case is being finalised for reporting. The planned workforce and community engagement/consultation was completed and reported to the Council in February 2025.  Community engagement to involve
the community and enable influence on the design of the future council transformation is under development. 
The refresh and refocus of the Transformation Strategy is complete and was approved by the Council in April 2024.
Further updates were presented to the Council in August 2024, with further definition of the strategy and including development of new projects and in October and November with a new project agreed by Council on 22/10 and
an update to corporate committee on 5/11. Work is also well progressed on developing planned projects which following a member workshop are nearing readiness for reporting and progress  continues on active projects. On
workforce, the workforce working group has completed its planned work to update workforce strategy and this was reported in August.
The 10 year capital plan has been reviewed by officers under the Financial Management project with the cap mechanism agreed in October 2024 and the review having progressed in November/December for reporting in
January 2025.  The Revised Short to Medium Term Financial Strategy is complete and was reported to Council on 26 June 2024. The medium to long term financial plan was reported to Council on 4 December.   Revenue
estimated actuals reported in December and corrective action planned.   Significant strategic service reviews completed. Further work is underway for the remaining actions and to continue to develop the short to medium term
financial position taking account of the budget settlement.  
Corporate Workforce Strategy and Plan agreed at Corporate Committee on 27 August and is now being implemented as part of normal HR-OD work.
Conclusions: The majority of actions planned for completion have been achieved on time.  Actions with longer timescales are noted to be carry forward.
4.1 Partnership Working for Moray
5.1 Community Budget Engagement ensuring local communities are more in Participatory
6.1 Sustainable Development
5. Working With Communities
6. Sustainable Development
Page 18

Page 19

Appendix 1
Summary: Progress has been made in mapping the Council Corporate strategies relevant to sustainable development against National Performance Indicators and corporate priorities; identify areas of focus 2024-2029, SD
changes expected and PIs to monitor progress; finalise draft principles. It is planned to bring this forward for wider consultation and involvement on the sustainability statement.
April 25: Good progress is being made on delivery of the actions.
Dec 2024: The Statement was agreed at committee on 4.11.24. This included a small number of actions for completion by the end of 2025. As the action plan is now agreed, the end date for actions has been adjusted to
December 2025 with progress on these ongoing including a report to council on 4.12 and a paper to the next meeting of the Community Planning Board on 3.12.24 on collective action on sustainable development and climate
change. 
Conclusions: The actions in the Sustainable Development theme have been delivered as planned and the final action due for completion in December will be carried forward.
Page 19

Page 20

Appendix 1
Normal business GREEN 100%
HoGSP 2 Normal business GREEN 100%
Summary:  This workstream is well advanced and the planned actions are complete for: equality and socio-economic duty actions and consideration of these within committee reports; Integrated Impact Assessments were
carried out on budget proposals and the views of equality groups were sought where appropriate. The remaining action is for staff training on equalities and the council equalities as an employer and this is underway and on
target. 
Dec 2024: Further refinement of the paper on sponsored eLearning has been carried out and is with DCE prior to going to CMT for final sign off.
Conclusions: All actions in the Fairness and Equality theme are complete
7.1 Equalities Action
7. Fairness & Equality
Page 20

Page 21

Report Date April 2025 (Corporate Committee 10/06/2025)
BRAGG Status - KEY BLACK -
Completed RED - Concern AMBER -
Caution
GREEN On
Target
GREY - Not
Started carry forward - actiont to be added to next plan             Continuing work - carry on as business as usual
Overall Schedule % Complete
GREEN 82%
Schedule Complete
AMBER 99%
Actions: Lead Schedule Start Date End Date % Complete
i Best value relationships project successfully
concluded (May 24). JWM Complete 28/03/24 20/08/24 100%
ii. Review undertaken to assess the level to which
relationships have improved across Members/ snr
officers and clarity regarding roles and
responsibilities. (Dec 24).
JWM Complete 01/08/24 24/12/24 100%
iii. Collaborative leadership programme established
drawing on best practice (Oct 24). JWM Complete 01/08/24 31/10/24 100%
iv. Joint political leadership continues to develop so
members work effectively on key decisions
including financial sustainability.
JWM GREEN 01/08/24 24/12/24 95%
Schedule Complete
GREEN 82%
Actions: Lead Schedule Start Date End Date % Complete
I Build Council vision, priorities and values into
employee engagement programme work. FG GREEN 01/07/24 30/06/25 90%
Hyperlink to documentIssues, Risks, Changes (I/R/C)
1.1 Collaborative Leadership - ensuring members and officers work effectively to secure key decisions Lead: CEx/Council (CL) PRIORITY 1
External consultant completed this phase of work by 31 May 2024 and the findings were reported to Corporate Committee on 27 August
2024.
This action is complete and the Report recommendations are being progressed and tracked
as part of other actions identified in the BV Action Plan
April 2025; Positive progress continues with further progress in collaborative  working as evidenced with the decision making processes for
the 2025/26 Budget. The collaborative working survey closed on 14 February.  It consisted of16 questions answered by all groups and 8
distinct questions for Chief Officers and another eight only answered by Councillors, each group answered 24  questions in total.
There were a total of 26 respondents from the previous participants in the external advisor's work (8 Chief Officers, 10 Elected Members
Without Special Responsibility and 8 Elected Members With Special Responsibility). The results confirm positive progress..
Dec 2024: In compliance with the previous decisions on the report relating to progress on Collaborative Leadership Development Work
considered by the Corporate Committee on 27 August, a further update report on progress was presented by the Interim Chief Executive to
Council on 4 December 2024 in lieu of the external consultant returning to conduct a review.  Positive progress was reported with more work
required and being progressed to embed the relationship changes necessary to enhance the Council's culture.
A progress review is planned for December 24.
April 2025;The results of the collaborative working survey will be reported to Corporate
Committee in June. 
Dec 2024: A 'pulse' survey will be issued to elected members and chief officers in January to  
establish a revised baseline in advance of the new Chief Executive starting in post in March
2025.  The analysis of the results will be completed in February and subsequently reported
to Council.
Sessions with groups previously established by the external consultant to be organised for
November to ensure progress with Collaborative Leadership development work continues.
Dec 2024:The Collaborative Leadership Programme was established with a progress update on delivery provided in a report to Moray
Council on 4 December 2024.  The Leader & Interim Chief Executive continue to work collaboratively to develop positive working
relationships internally and with external partners and local organisations to promote the Council's work. Members' Lounge option agreed. 
The Leader and Interim Chief Executive continue to work collaboratively and develop positive working relationships with external partners
and local organisations to promote the Council's work. Members' Lounge option agreed.
Future reports on progress with collaborative leadership will continue to be monitored
through regular reporting in the Corporate Best Value Action Plan updates to Council.  A
corporate management structure review is now scheduled to be progressed by February. 
Therefore, it is appropriate to align the implementation of the Leadership Dev. Prog. after
the structural work and start date of the new Chief Executive.
A corp. management structure review is now scheduled for completion by February. 
Therefore, it is appropriate to align the implementation of the Leadership Dev. Prog. after
structure work.
Next StepsProgress Update
Dec 2024:  Further training on Code of Conduct and budget decision making to be scheduled
for early 2025
1.2  Community and Partner Engagement on Council priorities PRIORITY 3Lead: DCE (ECOD)
Hyperlink to document
April 2025; Further Member training was implemented and good joint political leadership working continues to progress positively and
needs to be maintained or enhanced wherever possible on an ongoing basis. Therefore progress is marked as 95%.                                                                                                    
Good progress has been achieved with collaborative working as evidenced by the development of the 2025/26 Budget which resulted in
achieving balance without the use of non-earmarked reserves and with foundation work for the 2026/27 Budget progressed. Additional
Member training on the Code of Conduct was delivered.
Progress Update Next Steps
April 2025; TTD analysis completed; awareness of need to embed vision, priorities and values in engagement work going forward and
proposal on overall approach developed; suggested programme to be discussed with new CX at end of April and will be taken forward once
direction provided.
Dec 2024:   TTD issued 14/11. Reference to vision, priorities as appropriate in public and staff communications.
05-11-24 Detailed delivery plan developed and agreed at council along with engagement strategy on 25-09-24             
Detailed plan being developed with OD and Comms teams to ensure a planned and co-ordinated approach to deliver outcomes required
across all areas of the employee engagement programme, public communications and engagement and social media ensuring appropriate
alignment and co-ordination of public and workforce messaging.             
April 2025; agree approach going forward; deliver programme for remainder of year and
consider longer term work required around the engagement agenda.
Dec 2024:  Detailed work on overall approach to employee engagement continuing with
proposals for review and updating being developed further.
5-11-24: Information to be issued to provide update and shared understanding on current
position to workforce and community. Will include feedback on previous work on vision,
values and priorities, response to feedback and action since
Summary: 
Planned engagement and communication activity has been completed and reported as intended with reports to the council in February 2025.  The next stage of community engagement work is in development.  The outcome of the collaborative leadership survey is being reported in June with the BV update. Other work in this theme  continues to progress well.  There are revised dates proposed for the BV self-assessment to move away from the budget and year end timing and some work
has been scheduled to enable input from the new Chief Executive.
Work progressed as planned on collaborative leadership with  a survey that was concluded on 14 February and a report is scheduled to Council in May (now corporate committee for June).  Community Planning Board considered community engagement at a development session in October and identified opportunities for development to be taken forward in the new year as part of the approach to the LOIP. 
The proposals for Phase 1 of the corporate management structure have been approved by Council and formal consultation is in progress and now being led by the new Chief Executive who started in March.  A programme for the delivery of leadership development will now be finalised and implemented from late  August 2025 once the new Team is in place.  
Implementation of self-evaluation to deliver continuous improvement is progressing with the re-activation of the PSIF process moving forward and planned work with the Improvement Service to support delivery.
The Council engagement strategy for financial planning has been implemented with information and engagement activity through October, November and December  for reporting to the council to inform and influence financial planning in the new year .  All actions within this BV theme are currently on target.         
Conclusion: The majority of actions in theme BV1 are completed or well progressed and will be concluded by June 2025 as planned.  The actions relating to leadership development and performance score cards for services will be carried forward to the next action plan.  Continuing work will be required on PSIF to support the council's self-assessment and continuous improvement activity and Community Engagement will also feature as an ongoing area of development.
DELIVERY DATE: Dec 24
DELIVERY DATE: Jun 25
1. Vision and Leadership
19 December 2024 Code of Conduct
Issues, Risks, Changes (I/R/C)
Page 21

Page 22

ii. Promote vision and priorities in public
communication and engagement and social media. DW/FG GREEN 01/07/24 30/06/25 75%
Council report
25/09/24 (item9)  -
savings plan -
engagement
strategy appendix
Council report
21/01/2025 (Item 5) -
savings plan -
engagement
strategy appendix
iii. Working with Community Planning Partners
(CPP) to develop shared engagement. DW AMBER 01/07/24 30/06/25 35% CPP feedback report and presentations from
development session 24/10
iv. Take forward engagement and consultation on
service specific proposals e.g. for libraries and
leisure.
DW Complete 01/08/24 30/06/25 100%
Library Council report (22/10/2024 item 10
*confidential*                
Teamtalk dialogue and Cex email  Survey (lib
and general)   Public information links
v. Establish Community survey/panel, jointly with
partners if agreed DW AMBER 01/08/24 30/06/25 10%
vi. Staff survey – add questions on priorities. FG Complete 01/08/24 30/06/25 100%
Schedule Complete
AMBER 90%
Actions: Lead Schedule Start Date End Date % Complete
Hyperlink to document
Resourcing of community planning is an
ongoing risk to the work of the CPP
partnership which partners are aware of
and considering
Issues, Risks, Changes (I/R/C)
Dec 2024:  Approval for updated survey questions required then work taken forward to
launch March 2025
Progress Update Next Steps
April 2025; Survey launched following detailed comms and engagement work in effort to increase response rate, including development and
agreement of joint approach with Trade Unions. Open from 10 March to 4 April. Analysis is underway supported as far as is possible with
digital/technical approach.  ACTION COMPLETE.
Dec 2024:  Questions drafted and added to survey due March 25 for approval.
05-11-24 Suggestions for additional questions survey being drafted and survey refreshed for 2025.
Adding questions on priorities to employee survey is being picked up as part of the plan referred to in lines 18 and 19 above.
1.3 Leadership Development Action PRIORITY 1Lead: H HR,ICT & OD
April 2025;   Communication and engagement on budget proposals from December completed with workforce and public.  Development of
proposals on the next stage of community engagement underway,  discussion has taken place at Strategic Leadership Forum for guidance. 
Workshop held with councillors and senior leadership team on 18/3/25  on future council transformation as first stage of new engagement
programme. TTD analysis completed; supporting work to take forward implementation of digital engagement tool.
Dec 2024:  Engagement to take place with public and workforce over October (information) and November (engagement) to enable
influence on council financial planning linked to priorities:                 
> Teamtalk dialogue to be cascaded (Oct - Nov)                                       
> Public information issued (Nov)                                                                                                                                                              > Public/staff survey
open on general financial planning (Nov/Dec)                                                                                                                                                                     >
Public engagement session planned for Nov was postponed due to low take up and feedback that more specific topics would be of more
interest.  Plan to re-organise when specific topics are agreed by the council for discussion.                                                                       
> Specific consultation and engagement on libraries proposal took place (Nov)      
05-11-24: Council engagement strategy agreed at Council on 25-09-24 to take forward engagement on priorities and financial planning.
Delivery plan for strategy also approved and planning in place to begin delivery in October. Workforce engagement plans discussed with
trade unions at TU/Officer meeting and JCC (18/09/24) to build on previous experience and develop next engagement in light of that. 
Teamtalk dialogue approach to be used across workforce with parallel engagement to community work on council priorities and financial
planning run in October.     
Detailed plan being developed with OD and Comms teams to ensure a planned and co-ordinated approach to deliver outcomes required for
communication and engagement activity. A summary of planned engagement work has been prepared and is being shared with/CMT for
awareness and oversight           
Bid submitted for investment in online engagement tool.   
Report back to Council (Jan)                                                               
Continue development of sourcing online tool (once budget secured)
5-11-24: Engagement to take place with public and workforce over October (information)
and November (engagement) to enable influence on council financial planning linked to
priorities:                 
Teamtalk dialogue to be cascaded (Oct - Nov)                                       
Public information issued (Oct)                                                                        
Public/staff survey on general financial planning (Oct/Nov)                             
Public engagement session    (Nov)                                                                              
Report back to council (Dec/Jan)                                                              
Continue development of sourcing online tool (once budget secured)
April 2025: Council proposal for wider community engagement to be shared at Community Planning Officer Group (CPOG) in May . However,
resourcing across the Partnership remains to be resolved which impacts on the work that can be taken forward at strategic level for the CPP.       
Dec 2024:  CPP considered feedback from report outcomes of engagement
review work at October development session (24/10) and identified opportunities to develop                  
Further work on locality partnership working to inform future Loip (Mar 2025).  It is planned to advance this in the new year.
05-11-24 - the CPP development session on 24/10 will include consideration of the findings from the SCDC work below relating to localities
work and the outcome of this will  be used to contribute to the self-evaluation that the CPP will be carrying out as part of the national
programme being led by the Improvement Services.                                                                                                            
Work has also begun in September with CP  partner  Locality  specialists  to identify way forward and further work will be progressed for
inclusion in the future approach to the LOIP and potential One Moray plan       
Development sessions been held with community planning partners to consider priorities and how can take forward collectively.  This will
inform engagement                                        
Work ongoing to review the role of the Community Engagement Group and define moving forward.                                                                   
Work also taking place through the Scottish Community Development Centre (SCDC)  to review and learn from current practice
Further work on locality partnership working to inform future Loip (Mar 2025)
June 25 - report to CPB on proposal for the development of locality working aligned to CPB
priorities
Report outcomes of engagement review work (Oct/Nov)                      
Further work on locality partnership working to inform future Loip (Mar 2025)
DELIVERY DATE: Dec 24
April 2025; the next stage of community engagement is being considered, which includes a citizens panel approach. Discussion will be held
with CPP partners on the possibility of this being a partnership approach at CPOG.  This action is behind the planned timescales and new
target dates need to be considered.
Dec 2024:  Work is at very early stages to consider options and how these would contribute to the council's engagement strategy. 
CONTINUING WORK
Mar 24 - proposal to be developed
April 2025; Consultation on library proposals completed and reported to council in February 2025.  Library user groups established and first
meetings were held in April.  Work underway to establish Leisure user groups which will provide an opportunity for input to the next stage of
that review due to report later in 2025. There are no further current service proposals to be taken forward for consultation with
communities, therefore, it is proposed to close this action and that the next stage of engagement will be set out in a report to Council and 
monitored as a new action.
Dec 2024:  Council approved library proposals for consultation on 22/10.  Public and workforce communications were issued per stage 2 of
the engagement strategy and a survey issued to facilitate responses. Over 2000 responses were received to the Library survey and these
have been analysed and will be reported to the council in the new year.  The Council also approved savings on 4 December 2024, however,
there are limited specific requirements for public consultation on these.
05-11-24 - Engagement strategy approved on 25/09/24 sets foundation and plan to take this forward for libraries following council decision
on 22/10/14 after the 7/11 by election
April 2025; establish leisure user groups and take forward leisure review work as part of
next stage of engagement later in 2025/26. This will be part of the next stage of engagement
and reported as part of the leisure review later in 2025/26.
Subject to council decision on 22/10 - library consultation under Stage 2 of the engagement
strategy
Page 22

Page 23

i. Establish leadership development programme to
address corporate and individual leadership needs FG AMBER 01/07/24 24/12/24 90%
Schedule Complete
GREEN 42%
Actions: Lead Schedule Start Date End Date % Complete
i Re-establish Public Service Improvement
Framework (PSIF) as service continuous
improvement tool.
AMcE GREEN 01/07/24 31/03/26 60%
ii. Align other improvement tools to PSIF. AMcE GREEN 01/07/24 31/03/26 80%
iii. Put in place measure to address gap. AMcE GREEN 01/07/24 31/03/26 60%
iv. Continue corporate BV self-assessment for
yearly. DW/AMcE GREEN 01/08/24 31/03/26 30%
v. Agree updated BV action plan for continuous
improvement. DW/AMcE Not Started 01/08/24 31/03/26 0%
vi. Consider and establish service score cards to
provide overview to develop and track service
improvement corporately.
DW/AMcE GREEN 01/08/24 31/03/26 20%
Schedule Complete
Complete 100%
Actions: Lead Schedule Start Date End Date % Complete
i. Finalise the performance and delivery framework
for the new Corporate Plan. DW Complete 28/03/24 28/06/24 100% Service Plans (ECOD)
ECLS  20 June 2024 Item 04
ii. Publish Public Performance Report (PPR). FG Complete 28/03/24 28/06/24 100%
Hyperlink to document
Hyperlink to documentIssues, Risks, Changes (I/R/C)
Corporate Plan
Full Council 28 June 2024 Item 4
April 2025; Change - revert to monitoring as
part of corporate workforce plan in August
2025.
05-11-2024 Risk of not meeting BV deadline
if not agreed at Corporate Committee in
January.
Issues, Risks, Changes (I/R/C)
April 2025; Work completed to compare various improvement tools and reported to ECMT to give assurance of coverage.
Survey of services complete. 10 Oct 3mb due to CMT to agree methodology.
Dec 2024:  no update
Progress Update Next Steps
change of date
change of date
April 2025; PSIF being re-activated with a planned programme across services where PSIF is not currently active and there is no other self-
evaluation improvement tool in place
Survey of services complete. 10 Oct 3mb due to CMT to agree methodology.
Dec 2024:  no update
April 2025; A workshop is scheduled for 3 June 2025 to undertake the annual self-assessment.  Preparation is well underway, with
consultation with the Chair/Depute of ECLS and work with ECMT ahead of the workshop session.  It was decided to plan for a June session to
move this work away from the busy budget and financial year end periods and so while not following the planned date, this was moved to
enable council business and so the date is shown as amended and the RAG has been set at green.
Dec 2024:  Plan to undertake 2nd self-assessment in March 2025
Completed Apr 24
Due March  2025  June 2025 - amended date to move from budget time
April 2025; This will be taken forward after the recess so that the self-assessment and Audit outcomes can be taken into account.  The due
date has been changed to take account of this
Agreed April 24
Due April 2025 Sept 2025 - amended date 
Corporate Plan agreed by Full Council on 28/02/24           
Service plans agreed in May/June committee cycles
PPR agreed at Full Council on 26/06/2024 and published on the Council's website on 28/06/2024.
April 2025;
Work to develop Pentana ongoing, initial work to present performance overview on landing page for one sample service complete, progress
is slow as individual queries to be written.
Dec 2024:  No Update
Confirm whether Pentana work meets Scorecard expectation                          CARRY
FORWARD
1.5 Performance Reporting PRIORITY 3
Progress Update Next Steps
Lead: DCE (ECOD)
DELIVERY DATE: Mar 26
DELIVERY DATE: Jun 24
April 2025; Draft programme to re-activate PSIF has been agreed by ECMT for services that do not currently use PSIF or an alternative
improvement too. The first service (HR, ICT&OD) is being supported by the Improvement Service with council officers attending to learn from
the process to support further roll out.  Planned programme will be reviewed and refined as experience builds.
Dec 2024: Agreed to  adopt a 33  question psif l for all services apart from those who have their own regulatory or professional assessment
model such as "how good is our school". Further work requested  to evaluate which services have suitable alternative continuous
improvement models.
Survey of services complete. 3mb went to  CMT in  October to agree methodology.
April 2025; PSIF programme being re-activated.  HR, ICT&OD to complete in May/June. 
Planned programme to be reviewed following experience of completing initial services 
CONTINUING WORK
Agree review schedule with services. Incorporate improvements into service plans/team
plans/ERDP  where appropriate.
April 2025;Indicative strategy and Plan agreed at Corporate Committee on 25 January 2025 . Details of interim soft launch being worked on
but timing needs careful consideration given the corporate management restructure proposals and taking views of new Chief Executive in to
account.  Agreed at special full council on 15/4 that leadership development programme will be externally sourced to support the
implementation and embedding of the corporate management restructure proposals.  
Dec 2024:  Papers reviewed and further developed following feedback from CMT and ECMT.  To progress with implementation of
operational aspects within budget and underlying strategy to be considered with new CEx but ready to be reported to Full Council as
required.  Timescales reviewed to enable reporting to Full Council in 2025.
05-11-2024 Strategy and plan drafted, scheduled for CMT and circulated to ECMT for comments and on agenda for Corporate Committee for
January 2025
Work undertaken during early part of 23/24 being reviewed and refreshed taking account of feedback from CMT.  Project plan drafted with
detailed actions, milestones, allocation of work to ensure adherence to timescales, supporting development of Leadership Development
strategy.  Focus as a matter of priority on Senior Leadership Development (1st and 2nd Tier) with phased approach planned to ensure that
agreed approach filters through 3rd and 4th tier and further.  Papers being prepared with a view to reporting to CMT in August and Full
Council in Sept/Oct
April 2025;   work to date and future approach to be discussed with new Chief Executive at
end of April in accordance with information outlined in the corporate management
restructure. Ensure the themes and approach in the leadership development programme
that supports the implementation of the management restructure is reflected in any
substantive longer term leadership development programme,  CARRY FORWARD
Dec 2024:  Timescales and phased approach to be considered given work on corporate
management review, due to report in February 2025 and the appointment of new,
permanent Chief Executive, due to take up post in Spring 2025.
1.4 Continuous Improvement – implement self-evaluation. PRIORITY 2
Page 23

Page 24

Report Date April 2025 (Corporate Committee 10/06/2025)
BRAGG Status - KEY BLACK -
Complete RED - Concern AMBER - Caution GREEN On Target GREY - Not Started carry forward - actiont to be added to next plan             Continuing work - carry on as business as usual
Overall Schedule % Complete
GREEN 76%
Schedule Complete
Complete 100%
Project Titles: Lead Schedule Start Date End Date % Complete
Undertake a 6-month review of
the impact of training, AMcE Complete 01/07/24 31/10/24 100%
Schedule Complete
AMBER 80%
Project Titles: Lead Schedule Start Date End Date % Complete
i. Review effectiveness of
monitoring and scrutiny for
Health and Social Care Moray
(HSCM) established at Council
24/01/24.
JP GREEN 01/08/24 31/01/25 50%
Links to recent
Council Committee
report from the IJB
and also briefings
from the CSWO
Link to most recent
Full Council report in
04/12/2024 Item 7)
ii. Develop arrangements for
additional assurance, in
particular on financial
management.
LP GREEN 01/08/24 31/01/25 80%
iii. Ensure effective ongoing
partnership and collaborative
working arrangements for
Council/Moray Integrated Joint
Board (MIJB) management/
leadership.
JP JWM GREEN 01/08/24 31/01/25 75%
2. Governance and Accountability
2.1 Effective Scrutiny PRIORITY 3Lead: HoGSP
Lead: CEx
Issues, Risks, Changes (I/R/C)
Issues, Risks, Changes (I/R/C)
Progress Update Next Steps
DELIVERY DATE: Jan 25
Summary:
The 6 month review of scrutiny training is not yet due. Under the Risk Management project, the annual review of departmental risk registers that feed wider risks into Corporate Risk Register is complete as is the work on the corporate overview of business continuity and resilience which was reported to committee in April 2024.Work on business continuity is progressing as planned. 
Work on digital resilience is progressing with the first stage of the Board level desktop exercise completed and preparation for the next phase of workforce training and awareness in the final stages of preparation.
Conclusion: Good progress has been made in strengthening governance with considerable improvement on the arrangements relating to financial planning with the MIJB leading to a more sustainable budget position for both MIJB and the Council.  Actions relating to business continuity and resilience assessment and planning and cyber resilience will be carried forward.
DELIVERY DATE: Oct 24
Progress Update Next Steps
Dec 2024: Survey completed in October 2024 identified that members of the committee were generally
satisfied with training received, were clear around the role of the committee and recognised the
benefits of a rolling training schedule for AS cttee members.
Further training on scrutiny tools to be undertaken and survey issued 02 October to members of Audit
and Scrutiny to reflect on value of training in relation to their role, determine how well equipped they
feel with the role and on any changes to committee remit they think are appropriate.
Dec 2024:  Training for AS members  built into the regular meetings with
the Chair.
2.2 Sound Governance PRIORITY 1
April 2025:
Dec 2024:  Meeting has also taken place between TMC and the Chair and Executive Team from NHS
Grampian in relation to financial pressures and plans for 2025/26.
Regular meetings are in place with the Chief Executives of TMC and  NHS Grampian as partners with the
Chief Officer to the MIJB and the Chief Officer is a member of both the Council and NHS Executive
Leadership Teams.  Regular meetings also in place in relation to the budget and budget setting process
with finance teams across TMC and NHSG.  The Chief Officer and Senior Management Team meet on a
weekly basis with the IJB Chair and Vice Chair and also reports regularly into both TMC and the NHS
Grampian Board.
April 2025:
Dec 2024:  As per previous
Meetings in place and reporting into Council in relation to statutory
delivery as above.
.
Issue is to ensure positive strategic and operational
relationships across the partnership and that there are
appropriate forums to discuss risks, pressures and actions
required
Can share link to September NHS Board
meeting on IJB report and also most
recent Full Council IJB report from
December.
April 2025:
Dec 2024:  Report to full Council on matters relating to the HSCP is ongoing and report now includes
the regular Chief Officer report to the IJB in addition to the most recent minutes of the IJB meeting. 
Work being undertaken to continue to adapt and develop this to reflect services delegated by the
Moray Council.
HSCM provides a regular report to Full Council in relation to the activities and operational performance
of those services delegated by TMC for which they remain statutorily responsible.  The report aims to
provide information on those services as well as inform TMC on the strategic decisions being made by
the MIJB.  The effectiveness of this will be considered over the course of the calendar year through
ongoing engagement with elected members and the Corporate Management Team.
Dec 2024:  As above - reporting has been developed to include the Chief
Officer's report with intent to develop this further to include key
performance information in the first three months of the new year.
Regular reporting through Council in place with most recent report
discussed at Council on 13/08/24.  Ongoing consideration of report
formal and inclusion of matters relating to the council's statutory duties. 
Regular reporting and briefing by the Chief Social Work Officer in this
period in relation to current Joint Adult Support and Protection follow
up inspection.
April 2025:
Dec 2024:  Regular review meetings with MIJB CFO have now resumed. This included a review of the
estimated actual for 24/25. Access to confidential MIJB reports has also been provided to s95 and DCE
who are now consultees on key financial reports for MIJB.  MIJB oversight of the recovery plan is
through the Budget Savings Oversight Group and any issues arising between meetings are fed back to
s95 by MIJB CFO
Regular review meetings with MIJB CFO.
Hyperlink to document
Dec 2024:  Agreed that updated papers will be provided as far as
possible for all joint meetings to support greater scrutiny of ongoing
budget monitoring and progress with the Recovery Plan, together with
action logs.  Meetings to be programmed 8 weekly.
Review estimated actual.
Hyperlink to document
Risks are that there is insufficient awareness of the
operational delivery of social care services which are the
statutory responsibility of the council as one of the
partners to the integration scheme.
Risks are (a) dynamic environment with changing patterns
of need but a general upwards trajectory  from ageing
population and increased high costs packages and (b)
most recovery plan actions are cost reduction rather  than
budget savings so methodology for monitoring different
from standard practice in council
Page 24

Page 25

Schedule Complete
AMBER 78%
Project Titles: Lead Schedule Start Date End Date % Complete
i. Risk management is
undertaken. AMcE Complete 28/03/24 30/04/24 100%
ii. Corporate overview of
business continuity and
resilience.
AMcE Complete 28/03/24 30/04/24 100%
iii. Business Continuity Plans to
be in place for all critical services. AMcE AMBER 28/03/24 31/03/25 40%
iv. *Business impact assessments
(resilience) completed for all
services.
AMcE AMBER 28/03/24 31/03/25 70%
Schedule Complete
AMBER 45%
Project Titles: Lead Schedule Start Date End Date % Complete
i Complete implementation of
Cyber Resilience Plan. FG AMBER 28/03/24 01/07/26 40%
ii Complete Business Continuity
Plans/work for corporate and
service cyber resilience.
FG AMBER 28/03/24 31/12/25 50%
Hyperlink to document
A summary outline of the challenges to progress has been
provided to senior management in a 3 minute briefing
report.
Risk that volume of work arising through threat
exploration and fixing detracts from progress through
actions.   
FG report on capacity to be drafted.
Progress Update Next Steps
Lead: HoGSP
Lack of capacity for service manager and Information
Security Officer to properly address.
Issues, Risks, Changes (I/R/C) Hyperlink to document
The imperative is to match available resources to agreed
corporate and service plans that deliver optimum services
and secure best value. As this becomes more challenging,
decisions on business continuity are applied on a daily
basis as scarce resources are assigned to priority need.
With limited capacity or resource to invest in business
continuity  the updating of formal plans is lower priority
and this position is unlikely to change in the current
financial climate.
Issues, Risks, Changes (I/R/C)
April 2025: BC plan under review.
CARRY FORWARD
Dec 2024:  Not progressed due to demands previously above.
05-11-24  Work progressing, further information being considered by service. 
Initial review of previous BC plan begun.
April 2025:  BC plan to be moved to next stage of review (draft final
version).
Dec 2024:  HoS to progress review of BC plan.
05-11-24 BC plan to be reviewed with first draft to be completed Oct 25,
confirm feasible timescale, should progress with additional resource
noted above.
April 2025: the work carried out in the previous paragraph helps identify the relative risks across
services so BC plans can be targeted to higher risk areas.
CARRY FORWARD
Business Impact Assessments are a precursor to development of business continuity plans and the
constraints outlined above apply equally here. Risk Management reviews are identifying business
impacts  as a consequence of wider challenges all councils are facing, these challenges are difficult to
fully mitigate against in a period of rapid change.
April 2025: as above
As above
2.4 Digital Resilience Management PRIORITY E
Progress Update Next Steps
DELIVERY DATE: ?Lead: H HR,ICT & OD
April 2025: Further phishing exercise undertaken, results being analysed.  3rd training module
underway.     Resourcing plan drafted.  Development of second desktop exercise on cyber incident
response begun.
CARRY FORWARD
Dec 2024:  Resourcing option delayed due to time required on other critical demands i.e. Education
connectivity issues and cyber threats.
05-11-24 First stage of desktop exercise undertaken at Board level on 03-10-24.  Resourcing option to
create capacity identified, change management exercise being planned.
Progress made on cyber awareness training, arrangements for desktop exercise for CMT-SMT for cyber
incident response, deployment of fixes for live threats as notified by CRU/NCSC.
April 2025: Resourcing plan to be implemented.  Second desktop
exercise to be scheduled.
Dec 2024:  HoS to progress resourcing plan.
05-11-24 Change management plan and delegated authority report to
be drafted.   Timescales in plan to be reviewed with respect to
anticipated implementation of creation of resource..  
Timescales in plan to be defined more clearly, resource to be addressed
to create capacity required to ensure completion within timeframe.
April 2025: 3 minute brief prepared for CMT identified that capacity is an issue for some services to
progress business continuity plans.  Critical services have been identified and prioritised  to focus on
areas of higher risk. The brief also identifies that an increased risk appetite may be required.
CARRY FORWARD
This work continues with services committed to maintaining business continuity while in some cases
finding it challenging to create capacity to update formal plans. This particularly where day to day
business decisions are essentially focused on continuity, where in house resources are constrained and
innovative solutions are required to maintain service delivery.
April 2025: continue to progress this work with acceptance of an
increased risk appetite.
A review is being undertaken of the scope and coverage of plans in the
current operating environment. This will ensure those which add most
value continue to be prioritised, it being recognised in progressing this
work that some services are experiencing unmet need or are meeting
that need only through securing external support. The target delivery
date for critical services was 31 March 2025, this target may need to be
extended and is dependent on service priorities.
2.3 Risk Management PRIORITY E DELIVERY DATE: April 24 /  25*
Annual review of departmental risk registers feed wider risks into Corporate Risk Register Moved to  quarterly review of Corporate Risk Register.
Strategies approved in April 24
Page 25

Page 26

Report Date April 2025 (Corporate Committee 10/06/2025)
BRAGG Status - KEY BLACK -
Complete RED - Concern AMBER -
Caution
GREEN On
Target
GREY - Not
Started carry forward - actiont to be added to next plan             Continuing work - carry on as business as usual
Overall Schedule % Complete
GREEN 85%
Schedule Complete
GREEN 64%
Project Titles: Lead Schedule Start Date End Date % Complete
i. Stage 1: Refresh and refocus - new
developing transformation strategy agreed,
financial projects, new areas and acceleration /
expansion (May 24).
DW Complete 28/03/24 30/04/24 100%
ii. Stage 2: Further develop and define
strategy, specifying projects and savings (Aug
24).
DW Complete 28/03/24 30/08/24 100%
Council report
13/8/2024
Transformation
Strategy (item 6a)
iii. Stage 3: Future council programme (normal
business). DW GREEN 01/08/24 28/08/26 30%
Smarter working
phase 2 update
report to council
4/12/2024 (item
19)
Libraries report
council 22/10/2024
(item 10 -
confidential)
Review of OOH
report 22/10/2024
council (Item 12 -
confidential)
Corp cttee update
on 5/11/2024 (item
16)
Accts comm
overview report
iv. Establish corporate oversight to ensure
pace, prioritisation, new opportunities,
ongoing development and delivery of benefits.
DW GREEN 01/08/24 30/01/26 50%
v. Build in engagement with communities and
staff about the need for change and impact
any mitigation of proposed changes.
DW GREEN 01/08/24 30/01/26 40%
Schedule Complete
Summary: 
The review of the transformation boards has been completed and a single Council Transformation Board is now in place to ensure oversight of the whole Transformation programme of  work.  Projects continue to progress and the depots full business case is being finalised for reporting. The planned workforce and community engagement/consultation was completed and reported to the Council in February 2025.  Community engagement
to involve the community and enable influence on the design of the future council transformation is under development. 
The refresh and refocus of the Transformation Strategy is complete and was approved by the Council in April 2024.
Further updates were presented to the Council in August 2024, with further definition of the strategy and including development of new projects and in October and November with a new project agreed by Council on 22/10 and an update to corporate committee on 5/11. Work is also well progressed on developing planned projects which following a member workshop are nearing readiness for reporting and progress  continues on active projects. On
workforce, the workforce working group has completed its planned work to update workforce strategy and this was reported in August.
The 10 year capital plan has been reviewed by officers under the Financial Management project with the cap mechanism agreed in October 2024 and the review having progressed in November/December for reporting in January 2025.  The Revised Short to Medium Term Financial Strategy is complete and was reported to Council on 26 June 2024. The medium to long term financial plan was reported to Council on 4 December.   Revenue estimated
actuals reported in December and corrective action planned.   Significant strategic service reviews completed. Further work is underway for the remaining actions and to continue to develop the short to medium term financial position taking account of the budget settlement.  
Corporate Workforce Strategy and Plan agreed at Corporate Committee on 27 August and is now being implemented as part of normal HR-OD work.
Conclusions: The majority of actions planned for completion have been achieved on time.  Actions with longer timescales are noted to be carry forward.
3.1 Transformation and Sustainable Services Lead: CEx / DCE (ECOD) PRIORITY 1
Progress Update Next Steps
Issues, Risks, Changes (I/R/C) Hyperlink to document
April 2025:   ECMT continue to take oversight and consider project initiation.  Following the review of the
transformation boards, the 3 boards have been merged and the Council Transformation Board is now
operating as a single portfolio level programme board with oversight of all of the Transformation Strategy
work.  Work is also planned to revamp and project governance arrangements for consideration by the Board.    
Regular reporting to Corporate Committee is also giving oversight of the Transformation work to enable
review and challenge by members.                                                                                                      Carry Forward                                                                                                                                           
Dec 2024:  ECMT have reviewed and supported new mandates for projects on the replacement of Care First
and the use of Pool Cars.  Further work is being completed to enable these to move to the next stage and be
reported to committee/MIJB as appropriate.  Review of the operation of the Transform programme boards
has been identified for action early in 2025.
05-11-24 - quarterly reporting to CMT and Corporate committee established to ensure oversight,
prioritisation and pace
April 2025 - work on revamp of project governance arrangements                                                                             
Feb 2025 Review of Transform Boards
Issues, Risks, Changes (I/R/C) Hyperlink to document
Transformation Strategy
Appendix 1 – Strategy and Projects
Appendix 2 – Design Principles
Resources will require to be considered to
ensure and enable progress.                                                     
Transformation makes a medium to long term
change, risk focus on short term places risk on
longer term results   Challenge that expectation
of high financial return may not be achievable
Governance becomes less effective because it is
more onerous than can be supported by the
current arrangements - review of Boards aims to
mitigate this
Low engagement, especially on general issues
and financial planning.  Public fatigue from
volume and frequency.  Mitigation of improved
tools and wider approaches being considered
April 2025: Report on depot review;
Review of aim, vision and design principles                                                   
Confirm projects for inclusion in programme: reporting on Leisure,
Workforce, Learning Estate, Customer Contact service and Pool cars as
part of next iteration of transformation strategy                                      
Identify future developments and direction
April 2025: Communication and engagement on budget proposals from December completed with workforce
and public and was reported to council in February 2025. Early feedback from the employee survey is showing
awareness of the need for change. Proposals for the development of the next stage of community
engagement on the future of the council and its services to inform transformation plans and financial planning
in the medium to long term have been informed by discussion at Strategic Leadership Forum and are under
consideration.  A Workshop was held with councillors and senior leadership team on 18/3/25  on future
council transformation .                                                                            Carry Forward
Dec 2024:   Council approved library proposals for consultation on 22/10.  Public and workforce
communications were issued per stage 2 of the engagement strategy and a survey issued to facilitate
responses. Over 200 responses were received to the Library survey and these have been analysed and will be
reported to the council in the new year.  The Council also approved savings on 4 December 2024, however,
there are limited specific requirements for public consultation on these.
05-11-24 - implementation of agreed council financial engagement strategy underway to ensure awareness of
the need for change and to ensure influence in proposed changes. 
Jan 2025 - report to council on feedback from library consultation                                                                                   
Feb 2025 - Leisure engagement to follow on from council decision re the
future service
3.2 Workforce Planning Lead: Cex PRIORITY 2
3. Effective Use of Resources
DELIVERY DATE: Aug 26
DELIVERY DATE: Sept 24
05-11-24: Report to council in August noted progress and new projects for progress.  Member workshop on
21-08 used to inform next iteration of programme of work, including direction for leisure, libraries and
learning estate.  Work continues to develop areas identified and out of hours, learning estate acceleration
and workforce terms and conditions projects are all advancing to be reported to the council by January 2025
Projects mandates have been developed for new projects to assess merits and progress continues on active
projects.  Workshop on 3/7 to explore potential of  digital and outcomes being considered for future.  
Report to Council 13/8 on progress
April 2025: The quarterly update report was presented to Corporate Committee on 28 January 2025.  Projects
are progressing well and the depot review is ready to report the full business case.  Libraries future service
model was agreed by the Council on 19 February 2025 and work is underway with user groups on future
opening hours.  A workshop was held on 18/3 with councillors and senior officers to give direction for the
future council transformation and future community engagement work is under development                  Carry
Forward
Dec 2024:  Further work has been completed to confirm projects for inclusion in programme and continue the
development of existing projects with update for Smarter Working Phase 2 reported to council on 4/12 and
the Out of Hours project approved at Corporate Committee on 22/10 and the r Libraries, Learning Centres
and Heritage service redesign approved for consultation on 22/10         
05-11-24 - work is continuing to develop and define projects and to ensure projects ae specified to clarify the
savings that can be expected.  A number of projects are nearing reporting stage and will be included in the
update scheduled for January 2025.
The new Transformation Strategy and programme of projects was agreed by the Council on 24 April 2024. 
This included a refresh of the strategy and refocus on projects to ensure that they were aligned.  New projects
and opportunities were also identified for development.
Page 26

Page 27

Complete 100%
Project Titles: Lead Schedule Start Date End Date % Complete
Workforce Working Group established DW Complete 28/03/24 27/09/24 100%
I. Improve use of workforce data in ensuring
effective workforce planning. FG Complete 28/03/24 27/09/24 100%
ii. Update Workforce Plan to reflect new
models of service delivery and ways of
working, including how the Council is:
• Identifying and addressing skills gaps, at
operational and leadership levels.
• Making best use of existing workforce by
collaborating with partners to overcome
recruitment challenges.
FG Complete 28/03/24 27/09/24 100%
iii. Develop actions to support workforce
culture aligned to Transformation Strategy and
to support the issues identified from employee
survey results.
FG Complete 28/03/24 27/09/24 100%
Schedule Complete
GREEN 91%
Project Titles: Lead Schedule Start Date End Date % Complete
i. The Council will keep the affordability of its
capital plan and related revenue implications
under review,
LP Complete 01/07/24 Fri 27/09/24 100% Report to Council January 2025 Capital Strategy
04/12/2024
Corporate Asset
Mgmt Plan
04/12/2024
including review of the Capital Strategy and
Corporate Asset Management Plan.
LP Complete 01/07/24 Fri 27/09/24 100%
ii. The Council will strengthen monitoring of
the delivery of the Capital Plan and take action
to address any slippage. Ongoing quarterly
LP GREEN 01/07/24 30/06/2025               
March 2026 30%
Officers use only:
Guidance for
Budget Monitoring
to Committee
Capital Plan
2024/2025
04/12/2024
iii. The Council will review its Asset
Management Strategy to ensure optimum
arrangements are in place and the property
portfolio is reduced wherever possible. Phase
1 01/09/2024
DW Complete 01/08/24 Fri 27/09/24 100%
Issues, Risks, Changes (I/R/C) Hyperlink to document
change of date
Learning estate - high risk. Risks of acceptability
of approach, national policy and community
reaction               Affordability major risk and
condition of buildings and ongoing viability
Dec 2024:  Power BI expanded further and circulated to all 3rd tier managers.  Planned work is completed
although further improvements will continue to be worked on.
05-11-24 Work progressing to ensure full suite of data available for annual WFP discussions which are due
Nov 24/Jan 25.
Power BI developed and circulated to managers.
Dec 2024:  Plan with actions, milestones, timescales to be finalised. 
Data Protection issues to be resolved.
05-11-24 Refreshed approach to discussions with HoS and DMTs to
ensure full engagement and participation in identifying issues and
actions required to increase effectiveness.
Further elements of data to be included, schedule of HR metrics refresh
to be reviewed per 2024 Workforce Audit actions.
05-11-24: WFWG reviewed and supported the revise workforce strategy and plan which was approved by the
Corporate Committee on 27-08-24                                                                                
Agreed the draft terms of reference             
Workforce Working Group established and due to meet for 3rd time on 15/8.
WFWG to be asked to consider Terms and Conditions proposals
associated with financial planning as new area of work
Progress Update Next Steps
Workforce Working Group 23/04/2024 (item 12)
3.2 Workforce Planning Lead: Cex PRIORITY 2
April 2025: Proposed to amend completion date to take account of developing approach to capital planning. 
Carry Forward
Dec 2024:  Prior to entering new structure to fms, discussed at Finance Development Group to scope ICT
support needed.  Significant slippage reported at project level, moderated at programme level for report to
Council.   Monitoring report guidance issues to budget managers 
Outline project plan for improved capital monitoring to budget managers developed.  No further
development as resource directed towards annual audit
April 2025: Pilot by Sept 2025, complete by March 2026  Dec 2024:  Pilot
budget  profile for major projects in a project management style analysis
of project phases
Restructure capital on fms.  Trial revised budget monitoring statements
with budget managers - awaiting structure input following discussion
with ICT and this will be a lengthy task, prep work done
Progress Update Next Steps
Review commenced May 2024, looking at approach to applying cap on capital expenditure.  Recommended
approach developed during September and  reported to Council on 22 October 2024.  Following Council
decision the Capital Strategy and CAMP has been updated to incorporate the agreed approach and approved
by Council.  
N/A - complete
05-11-24 Sept date was noted as first stage of review.        
Phase 1 complete                
Beyond that, further work has progressed to develop a longer term sustainable asset base. Project on
rationalisation of learning estate considered at members workshop in Aug 24.  ECLS committee on 17/9
agreed to establishes a working group to consider further and first meeting has been scheduled for 24/10.  
Learning estate is a significant council asset and will have a considerable impact on the capital plan and has
been prioritised for that reason, however, the challenges will be significant.                                                                                             
Work is also under development in relation to the Leisure Estate, including MLC where buildings are also at
risk of failure and not being fit for the future.  An update report was provided to the council in October re
MLC and the work commissioned on the future of leisure services is due to report in October following which
a holistic report will come forward to the council, likely early 2025 due to complexities      
Review planned to commence after the Council recess (overarching status of LES, Leisure, smarter working etc
reviews)
Report on learning estate targeted for early 2025                           Report
on leisure estate targeted for early 2025
Capping mechanism for capital plan approved October 2024.  10 year plan updated during November and
officer review in December.  Cap applied.  Loans pool estimates updated for current rate of interest for
affordability PI
DELIVERY DATE: Sept 24
DELIVERY DATE: Dec 24
05-11-24 Revised Workforce Strategy and Plan  agreed at Corporate Committee on 28-08-24.
Workforce Strategy and Plan updated with revised draft incorporating feedback and actions from the
Workforce Working Group.
05-11-24 Planned work now business as usual across HR and OD teams
and monitored through normal performance management framework.
Workforce Strategy and Plan scheduled for Corporate Committee on
27/8/2024.
05-11-24 Planned work now business as usual across HR and OD teams
and monitored through normal performance management framework.
Workforce Strategy and Plan scheduled for Corporate Committee on
27/8/2024.
3.3 Financial Management Lead: Cex / DCE (EEF) /
CFO PRIORITY 1
05-11-24 Revised Workforce Strategy and Plan agreed at Corporate Committee on 28-08-24.
Actions to support issues identified from employee survey results are included in the workforce strategy and
plan, specifically developing the workforce to be prepared for change as well as actions for broad cross
cutting themes e.g. Communication.   
Page 27

Page 28

iv. The Council will review its forecasting
process to ensure the most accurate
projections. Dec 24
LP GREEN 01/08/24 31/12/24 90%
v. The Council will review its Reserves Policy to
ensure alignment with financial planning
including investment in Transformation. Sept
24
LP Complete 01/07/24 Fri 27/09/24 100%
Financial Reserves
Policy 25/09/2024
(item 8)
vi. The Council will review its Short to Medium
Term Financial Strategy. Jun 24 LP Complete 28/03/24 Fri 28/06/24 100%
vii. The Council will review its Medium to Long
Term Financial Strategy. Oct 24 LP Complete 01/08/24 31/10/24 100%
viii. The Council will develop a Savings Plan for
the short to medium term. Aug 24 LP Complete 28/03/24 Fri 30/08/24 100%
April 2025: No further action until year end results available in June
Dec 2024: Detailed forecast of centrally held provisions.  Corrective action identified by services re projected
overspend.  Capital plan spend forecast used programme level risk based modification of individual budget
managers line by line forecast
Reviewed last year's actual to estimated actuals to identify if there are any clear problem areas.  Main issue is
around accurate forecasting of central contingency
April 2025:  Compare estimated out-turn with actuals when available
(June)  Dec 2024:  Complete review of loans pool spreadsheet,  Set up
template for capturing use of ear-marked reserves
Calculate estimated actuals and incorporate risk factor
High level savings options identified at budget workshop on 19 June 2024.  Updated Savings Plan developed in
August and approved by Council Sept 2024
Need for further ear-marked reserves identified and implemented for 2023/24.  Metrics for assessing risk for
free general reserve updated and reported to Council September 2024.Level of free general reserves
approved.
Revised Short to Medium Term Financial Strategy reported to Council on 26 June 2024
Dec 2024:  Reported to Council 4 December 2024
Review almost complete, bar update on capital
Dec 2024:  Complete - no further action planned unless significant
change in circumstances
Update to reflect position re capital plan and finalise covering report.
Page 28

Page 29

Report Date April 2025 (Corporate Committee 10/06/2025)
BRAGG Status - KEY BLACK -
Complete RED - Concern AMBER - Caution GREEN On Target GREY - Not
Started carry forward - actiont to be added to next plan             Continuing work - carry on as business as usual
Overall Schedule % Complete
GREEN 32%
Lead: DCE (EEF / ECOD) Schedule Complete
AMBER 32%
Project Titles: Lead Schedule Start Date End Date % Complete
i. Work with Community Planning
Partners (CPP) to develop shared
priorities for incorporation into Local
Outcome Improvement Plan (LOIP).
DW AMBER 28/03/24 30/10/25 30%
ii. Investigate and develop potential
single Moray Plan. DW AMBER 28/03/24 30/10/25 12%
iii. Identify opportunities to maximise
the impact of resources and budgets
through alignment of activity. 2 Oct 25
CEx / DCE (ECOD) BV CRITERIA Ref
Best Value Improvement Outcome
Proposed Action E= existing 1 = High
Priority Date Delivery Lead CMT/SMT
DW AMBER 28/03/24 30/10/25 10%
April 2025: This work has not progressed this quarter due to the focus on council priorities (e.g. budget) and the
pressure on partner resources across the partnership.  It has not been possible to identify a partnership solution at
this point
Carry Forward
Dec 2024:   It has not been possible to make progress in the weeks since the last update due to focus on preparing
council budget. However, there has been work to identify partner resources to support this action and it is hoped
this can be advanced in the first quarter of 2025
05-11-24: meeting taken place with partners re locality work.  Identified scope for development and this will be
taken forward                                                                Small development group has discussed approach based on output
from development sessions.  Work to take place with partner reps involved in locality work to identify opportunities
There is no resource against this work and so
pace is likely to vary based on when capacity
can be released from other tasks
April 2025: This work has not progressed this quarter due to the focus on council priorities (e.g. budget) and the
pressure on partner resources across the partnership
Carry Forward
Dec 2024:  The most recent development session on 24/10 considered opportunities to further develop community
engagement in the delivery of priorities.
Development sessions been held with community planning partners to consider priorities and how can take forward
collectively.  Agreement reached on focus and main priorities for LOIP. This will inform the updating of the LOIP and
development of approach to delivery
Summary of what other councils do to be written up. Pace and consistency of progress are at risk
as no specific resource to develop this work.
CP partners to consider how to address this,
however, to date it has not been possible to
identify budget due to financial pressures
April 2025: This work has not progressed this quarter due to the focus on council priorities (e.g. budget) and the
pressure on partner resources across the partnership.  The CPP have recently participated in a National Self
Assessment session and the improvement plan will assist in progressing a way forward.
Carry Forward
Dec 2024:  It has not been possible to make progress in the weeks since the last update due to focus on preparing
council budget. However, there has been work to identify partner resources to support this action and it is hoped
this can be advanced in the first quarter of 2025.
05-11-24: Research completed of other councils established that 2 have single plans (noted below).  Discussion taken
place with Improvement Service for support on this area.  Potential for IS to undertake element of work if funded.                                                                         
This has been raised at the development sessions with the CP Board and there has been general support for the
approach.  To be considered further as the LOIP is re-developed.  Currently 2 of 13 family group authorities have a
single plan, Midlothian and Fife. Clackmannanshire also have a variation which is being looked at.
Summary of what other councils do to be written up. There is no resource against this work and so
pace is likely to vary based on when capacity
can be released from other tasks
4. Partnerships and Collaborative Working
Summary: A report has been considered on locality planning to embed this further into the work of the CPP based on the outcomes of CPP development sessions.  However, there is limited progress in other areas of work on this theme as work is managed by officers alongside their substantive remit with no specific CPP resource.  This remains a risk due to managing conflicting priorities.
Work with community planning partners is moving forward to develop shared priorities for the LOIP and there is early indicative support to develop a single Moray plan.  Locality plans are well developed and ongoing and consideration is now planned of learning across partners and service areas to identify opportunities for learning and greater impact from partners working more closely.  There has
been limited progress for Nov/Dec due to other priorities, however, work continues on building on the positive work within the partnership in the approach to locality working.  Discussions are also taking place between partners on options to dedicate resources to partnership work to enable more focussed action on Partnership Working for Moray in 2025 and it is hoped this will assist in taking
forward planned developments.
Conclusions: There have been challenges in developing partnership working as while community planning partners have been willing and supportive, constraints on resourcing across all agencies has meant that it has not been possible to allocate specific resources and conflicting priorities have made steady progress challenging.  This work is identified for carry forward with the exception
of where the single agency work has concluded and the CPP has been unable to resource progress in relation to the development of an approach to locality planning.
4.1 Partnership Working for Moray PRIORITY 2 DELIVERY DATE: Oct 25 Issues, Risks, Changes (I/R/C) Hyperlink to document
Progress Update Next Steps
Page 29

Page 30

iv. Continue development and
delivery of Locality Plans, involving
service users and local communities in
the design of services.
DW AMBER 28/03/24 30/10/25 75%
April 2025: The work ion development of Locality Plans for the areas agreed by the Council and CPP is well developed
and will be ongoing work.   The Council is also considering how to secure community influence on services and
priorities through the next stage of its community engagement approach.                                                                                                                                       
In considering the future of a locality approach as a CPP,  a report was considered by (Community Planning Officers
Group (CPOG) on 12 February and 14 May 2025 on embedding a localities approach within the LOIP and the CPP
work. The general approach was supported and a number of areas were identified to be considered to develop the
work.  MIJB is currently undertaking work in relation to children and HSCM locality models in specific locality areas 
over the next few months and officers will aim to build on this from a partnership perspective to connect more
directly with a Moray wide CPP approach..  This work is noted as 75% complete as the final stages are to be refined
by the CPP.                                                                                             Carry Forward
Dec 2024:  Work continues with the working group to consider the CPP approach to locality work and it is planned to
report progress to the CPB in the first half of 2025.
05-11-24 - the CPP development session on 24/10 will include consideration of the findings from the SCDC work
below relating to localities work and the outcome of this will  be used to contribute to the self-evaluation that the
CPP will be carrying out as part of the national programme being led by the Improvement Services.                                                                                                            
Work has also begun in September with CP  partner  Locality  specialists  to identify way forward and further work
will be progressed for inclusion in the future approach to the LOIP and potential One Moray plan         
Practice in this area is well developed and ongoing.  Consideration is now planned of learning across partners and
service areas to identify opportunities for learning and greater impact from partners working more closely
April 2025 - consider how can capitalise by linking with MIJB planned
work                                                                        June 25 - report to CPB on
proposal for the development of locality working aligned to CPB
priorities - Not currently proposed as at April 2025
There is no resource against this work and so
pace is likely to vary based on when capacity
can be released from other tasks
Page 30

Page 31

Report Date April 2025 (Corporate Committee 10/06/2025)
BRAGG Status - KEY BLACK - Complete RED - Concern AMBER -
Caution
GREEN
On Target
GREY - Not
Started carry forward - actiont to be added to next plan             Continuing work - carry on as business as usual
Overall Schedule % Complete
GREEN 55%
Lead: Schedule Complete
DCE (EEF / ECOD) GREEN 55%
Project Titles: Lead Schedule Start Date End Date % Complete
i. Progress arrangements to mainstream
Participatory Budgeting (PB)– develop
guidance for services and establish skills
development approach.
RG LP GREEN 28/03/24 30/06/25 75%
ii. Continue to build on approach to date of
involving communities across its financial
planning and service/policy change
processes and undertake reviews as
applicable.
DW AMBER 28/03/24 30/06/25 50%
iii. Engage key stakeholders (e.g.
Community Engagement Group,
Community Councils) on progress and
feedback for PB approaches and local
priorities.
DW AMBER 28/03/24 30/06/25 35%
iv. Deliver specific traditional PB exercises
for appropriate funding. RG LP GREEN 28/03/24 30/06/25 75%
5. Working With Communities
Issues, Risks, Changes (I/R/C) Hyperlink to document
Summary: Community engagement is being considered that will advance the use of PB approaches in influencing across the whole of the council's financial planning and plans for transformation. 
Guide to mainstream PB developed by CSU and circulated to all services.  Consideration is being given to the use of online tools and website enhancement to support engagement.  Work to review the operation of the Community Engagement Group has been completed and considered by the Group and was considered at the CPB development session in October 2024 where future approaches were
identified.  These are being taken into account in the proposals being developed for the CPB for the development of locality working. £109,000 via UK shared prosperity fund was allocated via PB to eligible arts, culture and heritage groups (July 24).  Progress is being made in mainstreaming PB principles into the council's approach to financial planning.  Event scheduled for November 2024 as part of
engagement work to encourage community influence was cancelled due to low sign up.  Consideration is being given to how best to address this for future. Draft list of current PB type activity circulated to Heads of Service and will be used to guide future activity.        
Conclusions: The Council has well developed arrangements ion place for communication and engagement that have been followed through in relation to financial planning.  The next stage of community engagement will aim to take forward the council's approach to mainstreaming PB to give community impact across its financial planning and services.
Dec 2024:  One further appropriate funding identified to date and Head of Service asked to consider PB
approach
£109K via UK shared prosperity fund allocated via PB to eligible arts, culture and heritage groups (July 24)
April 2025:
Dec 2024:  discuss if funding can be used for PB within SG time constraints
5.1 Community Budget Engagement ensuring local communities are more in Participatory Budgeting DELIVERY DATE: Jun 25PRIORITY 2
Progress Update Next Steps
April 2025: Information for 2024/25 collated; services contacted for update
Dec 2024:  Drafted list of current activity and identified further areas to progress, circulated to Heads of
Service
Guide to mainstream PB developed by CSU and circulated to all services.  Commenced discussions with Heads
of Service about capturing current activity
April 2025:
Dec 2024:  arrange meeting to discuss with budget managers following feedback
from Heads of Service
April 2025: Communication and engagement on budget proposals from December completed with workforce
and public and was reported to council in February 2025. Early feedback from the employee survey is showing
awareness of the need for change. Proposals for the development of the next stage of community engagement
on the future of the council and its services to inform transformation plans and financial planning in the
medium to long term have been informed by discussion at Strategic Leadership Forum and are under
consideration.  A Workshop was held with councillors and senior leadership team on 18/3/25  on future
council transformation.                                                                    Continuing Work
Dec 2024: Engagement to take place with public and workforce over October (information) and November
(engagement) to enable influence on council financial planning linked to priorities:                 
> Teamtalk dialogue to be cascaded (Oct - Nov)                                       
> Public information issued (Nov)     
> Public/staff survey open on general financial planning (Nov/Dec) 
> Public engagement session planned for Nov was postponed due to low take up and feedback that more
specific topics would be of more interest.  Plan to re-organise when specific topics are agreed by the council
for discussion.
> Specific consultation and engagement on libraries proposal took place (Nov)    
05-11-24: Council engagement strategy agreed at Council on 25-09-24 to take forward engagement on
priorities and financial planning. Delivery plan for strategy also approved and planning in place to begin
delivery in October. Workforce engagement plans discussed with trade unions at TU/Officer meeting and JCC
(18/09/24) to build on previous experience and develop next engagement in light of that.  Teamtalk dialogue
approach to be used across workforce with parallel engagement to community work on council priorities and
financial planning run in October.                                                                                 
Bid submitted for engagement tool to enhance options and capacity for engagement.
Report back to council on public engagement (Jan)                                                               
Continue development of sourcing online tool (once budget secured)
April 2025: proposals are under development to connect with community councils
Continuing Work
Dec 2024:  CPP considered feedback from report outcomes of engagement review work at October
development session (24/10) and identified opportunities to develop                    Further work on locality
partnership working to inform future Loip (Mar 2025).  It is planned to advance this in the new year.
Work has also begun in September with CP  partner  Locality  specialists  to identify way forward and further
work will be progressed for inclusion in the future approach to the LOIP and potential One Moray plan    Work
has been completed to review the operation of the Community Engagement Group (CEG) and reported back at
the CEG meeting on the 16th July.    
This work was carried out to engage CEG members about the purpose/format of the proposed event and also
to get feedback on the role of the CEG itself.
Further work on locality partnership working to inform future Loip (Mar 2025)
June 25 - report to CPB on proposal for the development of locality working
aligned to CPB priorities
Page 31

Page 32

v. Develop approaches to wider PB i.e.
participatory democracy. DW AMBER 01/08/24 30/06/25 40%
resourcing is a risk to the progress that can
be made in this developmental work
April 2025: embedding a PB approach into mainstream service and financial planning is being considered
through the community engagement that is under development.  Work on the digital engagement platform is
well progressed, and subject to securing the proposed temporary resource, this will also progress this action in
terms of a PB based approach.
Continuing Work
Dec 2024:  capturing current activity to establish areas to build on
05-11-24: public engagement planned under the engagement strategy approved by the council on 17-09 is
using PB principles in the design of the engagement work to enable community influence on council budget. 
Event planned for November 2024 will incorporate as well as opinion survey
April 2025:   Finalise procurement for digital engagement platform and begin
implementation
Dec 2024:  agree areas to build on
Public event in November to enable community influence in council financial
planning decisions                                                                            
Page 32

Page 33

Report Date April 2025 (Corporate Committee 10/06/2025)
BRAGG Status - KEY BLACK -
Complete RED - Concern AMBER - Caution GREEN
On Target
GREY - Not
Started carry forward - actiont to be added to next plan             Continuing work - carry on as business as usual
Overall Schedule % Complete
GREEN 60%
Schedule Complete
GREEN 60%
Project Titles: Lead Schedule Start Date End Date % Complete
Develop a Sustainability Statement
that draws together the range of work
the Council has in place to deliver
sustainability.
RG Complete 28/03/24 27/09/24 100%
Identify any gaps that require
consideration and action. RG GREEN 28/03/24 31.12.25 20%
Climate Change
Overview  - CPB
03/12/2024 (item 2)
Climate Change
Strategy / updated
Routemap to Net
Zero - FC 4/12/2024
(item 15)
6.1 Sustainable Development PRIORITY 3Lead: DCE (EEF)
Progress Update Next Steps
Dec 2024:  Statement approved at committee on 4.11.24.
05-11-24: Draft Statement framed, reviewed via SLF and a group of
interested members with final review at SLF 30.9.24; next step is
reporting to Corporate Committee on 4.11.24
Dec 2024:  Statement complete, close action.
Map TMC Corporate strategies relevant to sustainable development 
against National Performance Indicators and corporate priorities;
identify areas of focus 2024-2029, SD changes expected and PIs to
monitor progress; finalise draft principles.
April 2025: Actions are progressing in line with deadlines in Action
Plan.
Carry Forward
Dec 2024:  Work has begun on the actions set out in the Statement
with the end date for this action adjusted to reflect the  agreed
action plan timings.
05-11-24: Action Plan created and part of Statement; will address
current gaps pending wider review as part of Climate Strategy
review.
April 2025: Interim guidance for the Summary of Implications is now
in place, to be reviewed when the IIA process approach has been
agreed. A paper will be taken to MEP before the recess on the actions
around area wide emissions.
Dec 2024:  Work has begun on the review of the Summary of
Implications in reports in light of the Statement and actions linked to
the Climate Change Strategy review have begun with a paper to
council on 4.12 and a report to the Community Planning Board on
3.12.24.
Issues, Risks, Changes (I/R/C) Hyperlink to document
Summary: Progress has been made in mapping the Council Corporate strategies relevant to sustainable development against National Performance Indicators and corporate priorities; identify areas of focus 2024-2029, SD changes expected and PIs to monitor progress; finalise draft principles. It is planned to bring this forward for wider
consultation and involvement on the sustainability statement.
April 25: Good progress is being made on delivery of the actions.
Dec 2024: The Statement was agreed at committee on 4.11.24. This included a small number of actions for completion by the end of 2025. As the action plan is now agreed, the end date for actions has been adjusted to December 2025 with progress on these ongoing including a report to council on 4.12 and a paper to the next meeting
of the Community Planning Board on 3.12.24 on collective action on sustainable development and climate change. 
Conclusions: The actions in the Sustainable Development theme have been delivered as planned and the final action due for completion in December will be carried forward.
Sustainable Development Framework
05/11/2024 (item 15)
6. Sustainable Development
DELIVERY DATE: Sep 24
Page 33

Page 34

Report Date April 2025 (Corporate Committee 10/06/2025) 
BRAGG Status - KEY BLACK -
Complete RED - Concern AMBER - Caution GREEN On Target GREY - Not
Started carry forward - actiont to be added to next plan             Continuing work - carry on as business as usual
Overall Schedule % Complete
GREEN 100%
Schedule Complete
GREEN 100%
Project Titles: Lead Schedule Start Date End Date % Complete
i. Equality and socio-economic duty
addressed in our Corporate Plan and
Local Outcome Improvement Plan
(LOIP).
AMcE Complete 28/03/24 19/07/24 100%
ii. Integrated Impact Assessments (IIAs)
carried out for strategic decisions and
budget decisions.
AMcE Complete 28/03/24 19/07/24 100%
iii. Equality and socio-economic impact
considered in every committee decision. AMcE Complete 28/03/24 19/07/24 100%
iv. Equality outcomes are set and
reviewed. AMcE Complete 28/03/24 19/07/24 100%
v. Views of equality groups sought
during consultation. AMcE Complete 28/03/24 19/07/24 100%
vi. Staff are trained in equalities and the
Council equalities as an employer. FG Complete 28/03/24 30/11/24 100%
7. Fairness & Equality
Issues, Risks, Changes (I/R/C) Hyperlink to document
Summary:  This workstream is well advanced and the planned actions are complete for: equality and socio-economic duty actions and consideration of these within committee reports; Integrated Impact Assessments were carried out on budget proposals and the views of equality groups were sought where appropriate. The remaining action is for staff training
on equalities and the council equalities as an employer and this is underway and on target. 
Dec 2024: Further refinement of the paper on sponsored eLearning has been carried out and is with DCE prior to going to CMT for final sign off.
Conclusions: All actions in the Fairness and Equality theme are complete
7.1 Equalities Action PRIORITY 2Lead: HoGSP
Progress Update Next Steps
Continue current practice
DELIVERY DATE: Normal
business
Now to include children's rights under UNCRC Continue current practice
April 2025: sign off for core mandatory eLearning, including equalities given in
March 2025.
Dec 2024:  Sponsored eLearning proposal sets out planned approach to
mandatory e-Learning including equalities.
05-11-24 Further work undertaken responding to feedback.  
Equalities training is in place through a section on the Moray Management
Methods training and there is an Equalities and Diversity eLearning module.
April 2025: all core mandatory modules, including equalities, to be
uploaded to updated LMS, due to be launched in May. (although is
already available on existing platform)
Dec 2024: CMT sign off
In summary section of reports Continue current practice
Monitored and reported to committee. Need reviewed in 2025
Continue current practice
Page 34

Page 35

Appendix 2 
Collaborative Leadership and Working Relationships 2025
Survey – Brief Summary
Overview
The survey opened on Thursday 30 January and closed on Friday 14 February. It was analysed by
the following groupings -  
1. Overall (All participants who gave a response to individual questions)
2. Chief Officers
3. Elected Member with Special Responsibility Allowance
4. Elected Member without Special Responsibility Allowance
Each respondent had the opportunity of answering 25 questions. A total of 26 respondents
answered all 25 questions (8 Chief Officers, 8 Elected Members with Special Responsibility
allowance and 10 Elected Members without Special Responsibility Allowance). 
Analysis and detailed source tables highlighting key points have been considered by members 
at the Best Value workshop held on 3 June.
Key Finding summary
Positives
• Improving picture in the level of trust and mutual respect between Chief Officers and
Councillors 
• Evidence of more effective collaboration:
–  Increase in regular meetings and communications channels
–  Councillors feeling they are kept informed
–  Recognition of benefits of strategic leadership forum 
Challenges: 
• Chief Officers and Councillors need to work on an organisational culture is conducive to
innovation and improvement.
• Councillors without senior responsibility are less likely to say that Chief Officers and
Senior Councillors collaborate effectively
• Non administration Councillors can feel marginialised
• Mixed views on optimal sizes for committee
• Keeping reports succinct and avoiding  jargon 
Page 35

Page 36

Key Findings – All respondents combined
• The following questions showed positive responses, of particular note:
o “Regular meetings and communication channels with Committee Chairs and Vice
Chairs foster effective collaboration in decision-making processes.” (75%) (Elected
Members question set only)
o “The Corporate Management Team actively seeks input from both Chief Officers and
Councillors when making important decisions.” (75%) (Elected Members question
set only)
o “The Strategic Leadership Forum is effective in securing cross party-political input to
assist with policy development.” (100%) (Elected Members question set only)
o “Regular meetings and communication channels with Chief Officers help foster
effective collaboration in decision-making processes.” (72%) (Chief Officers
question set only)
o “I am regularly kept informed about key decisions made, including input from both
Chief Officers and Councillors.” (58%) (All respondents)
o “I feel confident in raising concerns or challenges with either Chief Officers or Senior
Councillors.” (77%) (All respondents)
o “Positive progress has been made in improving collaborative working relationships
between Chief Officers and Councillors.” (65%) (All respondents)
o “I am confident that Councillors and the Chief Officers will continue to improve
collaboration and effectiveness in the future.” (58%) (All respondents) 
Page 36

Page 37

Report to: Meeting
Date:
Corporate Committee 10 June 2025
Report
by:
Report No:Depute Chief Executive
(Education, Communities
and Organisational
Development)
GSP031/25/AS
Author: Atholl Scott Contact
Email:
atholl.scott@moray.gov.uk
Subject: Corporate Risk Register - April 2025 update
1. PURPOSE
☒ For Decision      ☐  For Information
1.1 The purpose of this report is to provide the Committee with the latest updated version
of the Council’s Corporate Risk Register.
1.2 This report is submitted to Committee in terms of Section III (B) (36) of the Council’s
Scheme of Administration relating to council wide or corporate risk assessment and the
mitigation and management of these risks.
2. SUMMARY
2.1 A key element of good governance is the effective management of risk. Risk is routinely
managed in many forms in the delivery of council services, and specific risk issues are
considered in all reports requiring a decision that are submitted to council or its
committees.
2.2 The updating of the Corporate Risk Register provides the opportunity for senior leaders
to reflect on the principal risks affecting the organisation, to consider how these risks
are being managed, and to ensure the measures in place to mitigate them remain both
appropriate and proportionate.
3. RECOMMENDATIONS
3.1 It is recommended that Committee consider and approve the updated Corporate
Risk Register dated April 2025 attached as Appendix 1 to this report.
Author: Atholl Scott
Job Title: Business Continuity/Risk Management Officer
Item 7.
Page 37

Page 38

4. BACKGROUND AND CONTEXT
4.1 Managing risk is a continuous process necessary to ensure that appropriate
governance standards are met in the use of public money and in the delivery of council
priorities. Risk informs day to day decisions at all levels of the organisation. The council
has a risk management policy and guidance to aid its risk management practice. This
includes a requirement for the periodic consideration of an updated corporate risk
register summarising the principal risks facing the council.
4.2 This Committee last considered the full corporate risk register at its meeting on 23 April
2024 (paragraph 9 of the minute refers) and subsequently received updates on
ongoing actions being taken to manage higher scoring risks at its meetings in August
and November 2024. The frequency of reviewing the register and its reporting to this
Committee remains under consideration by the newly formed Corporate Leadership
Team alongside proposals for amendments to the Committee meeting diary.
4.3
4.4
4.5
4.6
It will be appreciated that while managing all risks in a proportionate manner is
essential to the effective functioning of the organisation, risk mitigation measures will
not in all cases materially reduce the risk but simply contain it to the extent possible. By
way of example, the council has multiple measures in place to effectively manage its
financial affairs, notwithstanding these, the financial challenges the council faces going
forward are considerable. Associated risks are difficult to manage down. HR (staffing)
and IT (technological) risks likewise continue to have high residual risk scores
notwithstanding control measures in place.
Other strategic risk areas have seen the risk scores reduce, because of actions being
taken in mitigation. Where scores are reduced this does not mean that no further work
is required to manage these risks. Rather it reflects a positive assessment by
management that the risks are being managed as intended, having regard to council
policy and practice and any other relevant influences both internally and external to the
organisation.
It is also of note that not all risk is bad or should be avoided. Traditionally councils with
responsibility for public funds have been seen to be risk averse, however, there is now
broad acceptance that informed and managed risk taking is both appropriate and
necessary to support delivery of Best Value. A recent report by the Accounts
Commission on Transformation in Councils noted, ‘there is a low appetite for risk in
some councils where transformational activity is held back by fear of failure. Not every
transformational change will succeed but not progressing radical transformation is a
greater risk.’
The Corporate Risk Register currently references the concept of risk appetite for each
of the nine risk themes, but the council has not yet developed a formal Risk Appetite
Statement. Such a statement would be informed by both elected members and senior
management considering typical ‘levels’ of risk they would be willing to take in pursuit
of the council’s objectives. A workshop session to progress this is being scheduled for
after the summer recess. 
5. PROPOSALS
Page 38

Page 39

5.1 The Committee is asked to consider and approve the latest iteration of the Corporate
Risk Register dated April 2025.
5.2 The Committee is asked to note the intention to develop a formal risk appetite
statement informed by a workshop session to be held after the summer recess.
6. SUMMARY OF IMPLICATIONS
6.1 The table below shows whether risks and implications apply if the recommendations
are agreed:
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement
Plan)
X
Policy and Legal X
Financial X
Risk X
Staffing X
Best Value and Transformation X
Property X
Information Communications Technology/Digital           X
Equalities. Social Inclusion and Economic Impact X
Climate Change and Biodiversity Impact X
6.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans.
a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following
Council Plan strategic priorities:
☒ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☒ Improving wellbeing of our population.
6.3 Policy and Legal
The Council is required to have effective arrangements in place to manage risk as an
element of good governance practice.
6.4 Financial
There are no financial implications arising directly from this report.
One off Costs:
Page 39

Page 40

Service
Area
Budget Budget
Years
Proposed
Spend
this Year
Virement
From
Other
Comment
s
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable
)
Other
Comment
s
6.5 Risk
This report is about the management of risk.
6.6 Staffing
There are no staffing implications arising directly from this report.
6.7 Best Value and Transformation
Effective and responsible management of risk is essential to ensuring the council
optimises its use of resources in securing Best Value. Measured risk taking is an
essential element of service transformation.
6.8 Property
There are no property implications arising directly from this report.
6.9 Information Communications/Technology/Digital
There are no ICT/Digital implications arising directly from this report.
6.10 Equalities, Social Inclusion and Economic Impact
There are no Equalities, Social Inclusion or Economic Impacts arising directly from this
report.
6.11 Climate Change and Biodiversity Impacts
There are no Climate Change and Biodiversity Impacts arising directly from this report.
7. CONSULTATION
7.1 This report has been prepared in consultation with the Corporate Leadership Team and
any comments made have been incorporated into the report.
8. BACKGROUND PAPERS
8.1 None
Page 40

Page 41

Appendix 1
MORAY COUNCIL
CORPORATE RISK REGISTER AS AT
APRIL 2025
Page 41

Page 42

Appendix 1
SUMMARY OF PRINCIPAL RISKS
Nature of Risk Main issues Risk Score Risk
Movement
1. Collaborative Leadership Work to consolidate the benefits of collaborative working has continued with reports
taken forward to the council on actions forming part of the best value action plan.
Engagement with elected members has improved and closer cross-party working
has been achieved, and work continues to build on progress to date. Proposed
changes to senior management roles and structures are on-going and the risk
impacts of these are uncertain. The risk score (see matrix at foot of this summary)
was reduced when the risk register was last reviewed; no change is proposed at the
present time with the score remaining at 12. (likelihood 3 x impact 4).
12
2. Financial              Financial constraints across the public sector continue to impact on the council in
terms how it resources service provision. This is being managed using short, medium,
and long-term financial plans, notwithstanding financial settlements from Scottish
Government are for one year only. The setting of a balanced budget for 2025/26 has
been achieved without use of reserves through a combination of an improved
financial settlement from Scottish Government, an increase in Council Tax, and
savings generated through measures developed in line with the council’s
transformation plan. A number of unknowns including impacts of inflation and from
future pay awards have been highlighted during the budget setting process, as have
continuing pressures in respect of the council’s funding obligations to the Moray
Integration Joint Board. Longer-term financial planning projections note that further
Council Tax rises and additional savings will be required going forward. In terms of
both likelihood and impact the risk remains at the highest level the combined risk
score remaining at 25. (likelihood 5 x impact 5).
25
3.  HR (Staffing) Inability to recruit and retain well qualified or experienced staff across several service
areas remains an issue, staff workloads in these areas are unsustainable. A
workforce plan is in place designed to enhance leadership capacity, provide
development opportunities to equip staff for change; aid staff health and well-being;
and promote the council as an employer of choice. Innovative choices are being
made where possible; where this proves impracticable work is outsourced albeit this
can have cost implications. A plan to progress a review of all staffing structures
following any agreed changes to senior management structures is scheduled for later
in 2025/26; this should align resources more closely to agreed council priorities. The
20
Page 42

Page 43

Appendix 1
risk remains that the council will be unable to recruit to some posts as a consequence
of market forces, this in turn will impact on service continuity and performance. (see
also risk 7 below). The assessed risk score remains high at 20. (likelihood 5 x impact
4).
4. Regulatory Council operates in a heavily regulated environment and delivers a broad range of
statutory services. Policies and guidance aid delivery of these services and the
performance management framework monitors progress internally. Oversight
comes from regulators and inspectors both external and internal to the
organisation. Recommendations made are used as learning points and applied,
subject to resource constraints, to secure compliance and continuous
improvement. Senior leaders have an improved understanding of the capacity
challenges facing the organisation and the elevated risk impacts should there be
non-compliance with regulations. The risk was previously given a neutral rating
(likelihood 3 x impact 3); upon review this risk scoring continues to be appropriate
with senior officers confident that existing regulatory obligations can be met.
9
5. Environmental Council’s commitment to addressing climate change remains undiminished.  A
number of initiatives have been taken forward aimed at mitigating adverse impacts.
These include work on promoting active travel, improved biodiversity, high waste
recycling rates and decarbonisation of council buildings, alongside policy
developments linked to the forthcoming Local Development Plan. Work with others is
also taking place on future use of hydrogen to fuel vehicles and to secure external
funding and expand the number of charging points for electric vehicles. The
previously reported risks of ability to drive forward change and the costs of doing so
still apply, with Scottish Government climate targets extended and availability of
capital funding having the potential to limit what can be achieved. The council’s
approach overall is assessed as proportionate. The risk score has accordingly been
reduced from 9 (likelihood 3 x impact 3) to 6 (likelihood 3 x impact 2).
6
6. Reputational Reputation depends on consistent application of the Standards in Public Life.
The council is committed to meeting these standards, notably in promoting
Codes of Conduct for both Members and Officers, in being open and transparent
around its decision-making processes, and in adopting effective consultation with
citizens and service users. Equality Impact Assessments are used to inform
policy decisions as appropriate.  While reputational issues occur from time to
time, these are managed through engagement and action as appropriate. Given
10
Page 43

Page 44

Appendix 1
the breadth and scale of services delivered and expectations of service users;
the likelihood of reputational issues arising from time to time is probable albeit
with the impact typically localised. This risk score remains unchanged at 10
(likelihood 5 x impact 2).      
7.  Operational 
Continuity and           
Performance
Council performance falls below targeted levels for sustained period; performance
reporting is delayed.  Transformational change does not proceed as intended due
to capacity issues. Council has been advised during budget setting that a reduction
in capacity, without a reduction in council activities and duties, can result in a less
resilient organisation. This has the potential to impact on partnership and cross
service working, capacity to respond to emergencies, and on capacity to support
and develop staff. While significant adverse cumulative impacts are not inevitable
this risk will require careful monitoring. Previously, the risk score was assessed as
very high scoring likelihood 4 and impact 4; upon review likelihood is unchanged
with impact reduced to moderate (Score 3), careful consideration being given to
impacts on services of any operational changes proposed.
12
8.  IT (Technological) Major disruption in continuity of ICT operations; changes to systems and processes
and new ways of working create added pressures for ICT staff; data security is
compromised. With ICT systems integral to the effective delivery of most if not all
services, the impact from disruption to services is at the highest level and
notwithstanding risk mitigation measures in place, the potential for disruption,
including from external threats, cannot be discounted. The service has reviewed and
updated its ICT and Digital Strategy and Plan to guide service activity and
development for the next three years. The risk level here is unchanged with a risk
score of 20, (likelihood 4 and impact 5).
20
9.  Economic        
Sustainability
The Corporate Plan has as one of its three objectives the building of a stronger,
greener, vibrant economy. This links to separate policies on climate change,
biodiversity, and community wealth building, and aligns with the Moray Economic
Strategy developed on a multi-agency partnership basis. The Strategy sets out an
ambitious vision and programme of work designed to support economic
development in Moray over a ten-year period and will be complemented by the
Local Development Plan currently in preparation. The Moray Growth Deal is
being taken forward alongside other projects being delivered through the levelling
up fund and the future plan for Elgin. A significant volume of work is being taken
forward and alongside the risks being managed by the council, there are risks in
6
Page 44

Page 45

Appendix 1
partnership working with dependencies on both UK and Scottish Governments
and other agencies involved. Given the clarity of vision and purpose, and the
progress with the Growth Deal thus far the overall risk scoring from a council
perspective has been reduced from 8 (likelihood 2 x impact 4) to 6 (likelihood 2 x
impact 3).
Page 45

Page 46

Appendix 1
RISK CLASSIFICATION
RISK RATING LOW MEDIUM HIGH VERY HIGH
RISK MOVEMENT DECREASE
↓
NO CHANGE
↔
INCREASE
↑
The process for managing risk is documented separately in the council’s risk policy and guidance notes. The risk rating
is calculated by reference to assessed likelihood and impact (on a scale of 1 to 5) for each identified risk. The minimum
score (lowest risk) being 1x1=1, the maximum (highest risk) 5x5 =25. Scores of 3 and below are ranked low, green;
between 4 and 6 medium, yellow; between 8 and 12 high, amber; and 15 and above very high, red, as per the table below.
LIKELIHOOD
Almost certain 5 5 10 15 20 25
Likely 4 4 8 12 16 20
Possible 3 3 6 9 12 15
Unlikely 2 2 4 6 8 10
Remote 1 1 2 3 4 5
1 2 3 4 5
Minimal Minor Moderate Major Catastrophic
IMPACT
Page 46

Page 47

Appendix 1
1.
Description of Risk: Collaborative Leadership.
A lack of collaborative working between councillors/councillors and councillors/officers creates the risk that:
• The Council’s strategic priorities are not fully achieved.
• The Council’s decision-making processes are less effective with decisions being delayed or avoided.
• Staff time resources are not optimised on council priorities.
• Partnership working is not as effective as it could be.
Lead: Elected Members / Council Administration / Chief Executive / Corporate Management Team
Risk Rating: low/medium/high/very high
HIGH
Likelihood 3 x Impact 4 = Score 12
Rationale for Risk Rating:
Leadership risk has been a theme running through council Best
Value Assurance Reports for some time. The council has secured
external expertise to support improvements in strategic leadership
and decision-making processes. This has been evident in the
development of the current Corporate Plan and in the setting of the
budget for 2025/26. There is also closer working across political
groups and with non-aligned members to build better working
relationships and secure consensus where possible. The direction of
travel has been positive enabling progress. Work continues to fully
implement the agreed revised senior management structure, and
until this is fully bedded in the risk rating remains unchanged.
Risk Movement: increase/decrease/no change Risk Appetite:
There is a strong appetite for the council to be successful in delivering
best value services for its citizens against a challenging background
of increasing demand and diminishing resources and a need to identify
service priorities. Political stability is key to this success.  Note: the
risk appetite evaluation will be re-assessed following the planned
development of a formal risk appetite statement.
Page 47

Page 48

Appendix 1
Controls: Current and Proposed Mitigating Actions:
Suite of governance documents in place and regularly updated.
Cycle of Council and Committee meetings established to discharge
leadership functions.
Ten-year strategic plan - Moray 2027 (the Local Outcomes
Improvement Plan) being delivered jointly by the council and its
community planning partners.
Corporate Plan for 2024/26 implemented identifying council priorities
and aligning these to the budget setting process.
Best Value Action plan addresses collaborative leadership, with
external support secured.
Additional measures adopted to support inclusive cross party working.
Committee report format updated to ensure decision making
processes have regard to all relevant policy implications.
Collaborative working/ leadership survey planned for 2025 to assess
the impact of changes.
Approach to developing updated Local Outcomes Improvement Plan
– including community engagement – being considered in conjunction
with the partners in the Community Planning Board.
Plans in train to promote leadership development following new
appointment to the post of Chief Executive.
Evaluation of scrutiny function of elected members in the context of
how scrutiny activity complements the role Elected Members
currently exercise in meetings of the Council and in policy/service
committees.
Risk appetite being formalised to guide policy approach to planned
transformation and change.
Consideration to be given to providing dedicated resources to
partnership working to enable more focused action to be taken on joint
initiatives.
Page 48

Page 49

Appendix 1
2.
Description of Risk: Financial: Notwithstanding the statutory requirement for the council to set a balanced budget annually, there is an on-
going risk of financial failure with demand for services outstripping available budget. While a budget has been agreed for 2025/26, risks
highlighted previously by the Chief Financial Officer remain, including uncertain levels of government funding in future years, price inflation,
the potential for increases in interest rates leading to higher borrowing costs, and pay award settlements unknown. Uncertainties around the
council’s current and future funding obligations to the Moray Integration Joint Board add to this risk.
Savings targets for future financial years have been identified as part of the council’s short term financial plan through to 2027/28 year, to be
achieved through efficiencies, increased revenue generation and changes to service provision through the council’s continuing
transformation programme. The risks in doing so are significant having the potential to impact on all sectors of the community, particularly so
on those who are most disadvantaged. The council recognises its duty to minimise inequality by targeting support towards those who need it
most. Financial risk is being actively managed with financial monitoring and reporting undertaken throughout the year.
Lead: Corporate Management Team/ Senior Management Team/ Chief Financial Officer (Section 95 Officer)
Risk Rating: low/medium/high/very high
VERY HIGH
Likelihood 5 x Impact 5 = Score 25
Rationale for Risk Rating:
The Council has consistently delivered significant savings in recent
years but the need to make further savings remains, and the
challenge of continuing to do so while meeting service demands will
be increased given the factors outlined above. Likelihood and impact
risk remain unchanged given the anticipated level of savings
required in future years. 
Risk Movement: increase/decrease/no change Risk Appetite:
The council has no risk appetite for financial failure given its statutory
requirement to manage its resources in a responsible and prudent
manner and to continue to deliver statutory services. However, it
recognises, as a consequence of financial constraints, that services
being curtailed have the potential to result in a diminution of
performance. Expectations of service users will require to be
managed. It is also of note that public finances generally are
constrained with uncertainty around future financial settlements that
will be allocated to Local Government.
Page 49

Page 50

Appendix 1
Controls:
Financial plan in place with budget projections in place for current and
next two financial years.
Financial pressures identified.
Ten-year capital plan reviewed for affordability; cap mechanism
agreed.
Short/ medium/ long term financial plans developed.
Regular budget monitoring reports (on capital and revenue)
presented to council.
Financial Reserves policy reviewed and updated.
Financial regulations in place and regularly reviewed.
Treasury Management strategy agreed and monitored.
Procurement Policies and Practice.
Energy Monitoring and Reporting.
Internal Auditing; External Audit and Inspection
Annual pricing review on charges for services.
Current and Proposed Mitigating Actions:
Ongoing financial plan monitoring and reporting to ensure council
oversight and visibility of progress to address budget challenges.
Work of the ‘Transforming the Council’ and Programme Boards
including the BVAR and the Transformation Strategy to inform cost
reductions aligned to potential redesign of services.
Working closely with and seeking assurances from the Moray
Integration Joint Board to ensure, so far as is practicable, that the
financial contribution to be made from Council resources does not
exceed budget projections.
Asset base requires sustainable rationalisation with the Depot
Review project to be concluded.
School estate engagement across area school groups (ASGs) in
progress.
Continue development of participatory budgeting processes through
community engagement and involvement as appropriate.
Page 50

Page 51

Appendix 1
3.
Description of Risk: Human Resources (People): Effect of planned staffing reductions on services, both on staff directly affected and on
workloads of staff in teams where staff numbers are reduced.  The flexible working policy has in part alleviated service pressures but with
small teams, competing demands and a need to develop capacity for change, staff morale can be affected. High staff turnover and resultant
vacancies also increases the risk of being unable to meet service demands, resulting in a focus on short term requirements to the detriment
of planning for longer term service improvement.
Inability to recruit and retain well qualified or experienced staff, staff unprepared for change, lack of staff engagement, inadequate health and
safety arrangements. With staff the council’s most important resource, there is a need to ensure employees are equipped to embrace change
and deliver services in different and innovative ways that as far as possible are sustainable at a time when resources are reducing. This will
prove challenging given that further budget reductions are required, with potential workforce implications. There is also an increased risk that
corporate and service plan targets will not be met, leading to reduced service quality and performance, a failure to deliver Best Value and
less than satisfactory reports from inspectorates and other agencies.
Lead: Depute Chief Executive (Education, Communities and OD); Head of HR, ICT and OD.
Risk Rating: low/medium/high/very high
VERY HIGH
Likelihood 5 x Impact 4 = Score 20
Rationale for Risk Rating:
Reduced ability of smaller teams to deal with competing and complex
demands and to forward plan across a wider Council agenda and be
ready with a strategic response.
Difficult to recruit in a range of areas including certain subject
teachers; vehicle technicians; specialist professional posts; senior
management; clerical and administrative roles; temporary and relief
staff; and community care employees.
Staff turnover leads to loss of expertise and ‘corporate memory’.
Workforce planning is used to offset this, especially for key roles.
Inability to meet service demands and secure continuous
improvement.
Staff morale and productivity is affected as a consequence of smarter
working arrangements.
Given the foregoing issues the risk rating remains at a very high level
with current staffing challenges almost certain to continue, leading to
a likelihood score of 5 with consequential moderate to high impacts
in service areas directly affected.
Page 51

Page 52

Appendix 1
Risk Movement: increase/decrease/no change Risk Appetite:
The council as a responsible employer has a duty to provide a safe,
attractive, and rewarding place to work, with employees central to
the successful delivery of the council’s strategic and service
priorities. Accordingly, while acknowledging challenges in aspects
of public sector recruitment and changes to working practice to
secure efficiencies, there remains a strong appetite to ensure staff
morale and motivation is maintained at a high level and that the
council is seen as an attractive place to work.
Controls:
Corporate Workforce Strategy in place.
Leadership Development Programme established.
Employee Communications & Engagement Framework (including
Interchange bulletins, senior manager visits and manager forums)
Health and Work Policy
Health and Safety Policies and Annual Report.
Absence Management Policy
Living Wage Employer accreditation secured to support recruitment
strategies.
Flexible working policy refreshed and rolled out as part of Smarter
Working Initiative.
Fire risk assessments completed in line with planned schedule.
Mental health and wellbeing Pulse Survey results used to inform
improvement actions.
Current and Proposed Mitigating Actions:
Progress senior management staffing restructure to conclusion.
Planned review of staffing structures scheduled to ensure these are
sustainable and sufficient to deliver service priorities to agreed
standards.
Annual Review of Workforce Strategy and Plan for 2024 to
2027 completed and activity to address the main themes of:
Leadership capacity and development; ensuring leaders,
managers and supervisors are equipped with skills and
behaviours necessary for new ways of working.
Supporting the workforce through a period of change including
active management of vacancies and maintaining good
employee relations.
Organisational Development, with the workforce empowered
and enabled to embrace change through a range of in-person
and on-line training opportunities.
Reviewing recruitment and retention strategies, continuing with
apprenticeship and training programmes, and developing
succession planning, where appropriate.
Health and Wellbeing initiatives being taken forward to support
staff in the workplace, with linked objectives of proactively
supporting attendance at work and reducing incidents of
violence and aggression against staff.
Support consistent application of employee review and
development programme to aid workforce development.
Page 52

Page 53

Appendix 1
4.
Description of Risk: Regulatory: Expected governance standards are unmet. Council is subject to censure.
The council is heavily regulated by statute, by national guidance and through local policy and procedures and, within its systems, has
established checks and balances to support delivery of intended outcomes. Adapting council priorities and plans to accommodate new duties
is key to limiting the risk of regulatory failure with elected members, on the advice of senior officers, being responsible for creating capacity to
accommodate changes to policy and service delivery revisions.
Lead: Corporate Management Team/ Chief Financial Officer/ Monitoring Officer/ Heads of Service
Risk Rating: low/medium/high/very high
HIGH
Likelihood 3 x Impact 3 = Score 9
Rationale for Risk Rating:
Governance arrangements have been developed over many years
and are subject to regular oversight and monitoring.
Systems and processes are subject to on-going review and
development within the council and its services.
Corporate support and review in relation to performance, audit, and
inspection.
Change increases the risk of system breakdown and non-compliance
with regulatory requirements.
In the current economic climate and having regard to the challenges
facing the wider public sector a neutral scoring has been allocated
with a regulatory breach not likely but possible and the impact
potentially in the range from significant to minor dependent on the
circumstances presenting.
Risk Movement: increase/decrease/no change Risk Appetite:
The council has zero appetite for regulatory failure and takes seriously
its responsibility to ensure all services are following statutory
regulations and standards. A robust approach is taken to securing
governance arrangements which includes suitable systems of
internal control, albeit capacity issues can emerge where new duties
are placed on the council.
Page 53

Page 54

Appendix 1
Controls:
Governance statement prepared annually in line with best practice
guidance.
Monitoring officer oversees governance processes.
Constitutional documents available to direct good governance.
External scrutiny and inspection
programme.
Internal and external audit arrangements.
Suite of Governance and Scrutiny documents in place and
regularly updated.
Annual service planning process.
Current and Proposed Mitigating Actions:
Continue to monitor likely impacts from new policy initiatives that
have the potential to require significant council resource inputs.
Consider statutory duties and other directions, including Integrated
Impact Assessments where applicable, when reviewing and updating
strategic plans and council priorities.
Ensure capacity to deliver new duties is fully considered and
anticipate and report on any implications that have potential to lead
to non-compliance.
Complete delivery of actions in Best Value action plan.
Pro-active management response to issues raised in inspection
reports.
Continued active participation in delivery of joint services with statutory
and other partners as appropriate.
Page 54

Page 55

Appendix 1
5.
Description of Risk: Environmental: Ability of the council to respond to climate change emergency, to keep up with the pace of changing
carbon reduction, waste, and environmental targets. Impact of climate change and severe weather events; ability to deal with unforeseen
emergencies is compromised by inadequate resilience. The council continues to invest in projects to address climate change issues, to
manage energy use and ensure it is well placed to respond to crisis situations in conjunction with the emergency services and other partners.
Lead: Depute Chief Executive (Economy, Environment and Finance), Head of Environmental and Commercial Services
Risk Rating: low/medium/high/very high
MEDIUM
Likelihood 3 x Impact 2 = Score 6
Rationale for Risk Rating:
This risk, although multi-faceted and challenging, is being
mitigated by progress made to reduce current and future
threats through the development of clear action plans,
noting that longer term achievement of climate targets will
only be feasible if additional external funding is secured.
Given this and wider economic challenges, Scottish
government targets for achieving net zero have been
extended. The situation remains under close review by the
Climate Change team.
Separately, it remains the case that any reduction in
workforce from the budget balancing exercise could
impact on the council’s ability to respond to emergency
environmental situations arising from adverse weather
events. The overall assessment is that the risk is being
managed effectively and proportionately hence the risk
score has been revised downwards.
Risk Movement: increase/decrease/no change Risk Appetite:
Proportionality is reflected in risk appetite such that the
development and application of preventative measures
mitigates risks to pre-determined and achievable levels for
the council while recognising the collective societal effort
that will be required to address environmental risks.
Page 55

Page 56

Appendix 1
Controls:
Climate Change Strategy for 2020-2030 in place
Climate change route map to zero updated and subject to ongoing monitoring. 
Climate change and energy teams in place.
Recycling awareness promoted and high rates achieved.
Residual waste no longer sent to landfill but processed through energy from
waste plant.
Street light replacement programme completed to reduce carbon emissions and
energy costs.
Electric pool cars introduced as part of council fleet de-carbonisation together
with cycling/walking initiatives.
Housing investment programme which aims to achieve energy efficiency
standards.
Moray Local Development Plan considers climate change issues.
Council part of North of Scotland Regional Resilience Partnership
Council Co-ordination Centre established and operational; crisis communications
secured.
Energy efficiency measures built into new school building programmes.
Emergency response co-ordinators and support staff identified and trained.
Growth Deal – Bus Revolution being implemented to improve access to greener
travel.
Just Transition Funding secured to support feasibility studies aiding transition to a
zero-carbon economy.
Smarter working protocol established to reduce staff travel.
Current and Proposed Mitigating Actions:
Coastal erosion/ protection – strategy under development
Depot Review being progressed– contributing to de-
carbonisation through reduction in portfolio of buildings to
service and maintain.
Route map to zero monitoring and reporting.
Supporting locally sourced procurement to limit
environmental impacts.
Investigation of hydrogen as a fuel for heavy vehicles and
plant.
Climate Change Strategy being refreshed.
Climate change team considering adaptation measures:
adjustments in response to observed and projected climate
change impacts.
Planning for emergency disruption from extreme weather
events continues.
Continue working with partners where appropriate to
secure additional funding that will support climate change
mitigation initiatives.
Page 56

Page 57

Appendix 1
6.
Description of Risk: Reputational: Not meeting agreed performance targets (e.g. on educational attainment); not delivering on
transformation projects, overspending or failing on a school build; lack of progress on Best Value improvement plan; major adult or child
protection failing, missing a major policy direction or funding opportunity because resources/capacity are limited.
The council provides services to all sectors of the community and while committed to high service standards, the diversity of service provision
and the expectations of the public may increase the risk that the council’s reputation could be called into question. This risk generally is
considered to be managed through service planning, performance management, organisational development, the application of codes of
conduct, complaints procedures and similar, however any reduction in services to any individual or group of individuals may justly or
otherwise impact on the Council’s reputation.
Lead: Corporate Management Team/ Heads of Service/
Risk Rating: low/medium/high/very high
HIGH
Likelihood 5 x Impact 2 = Score 10
Rationale for Risk Rating:
The risk rating has regard to established systems, procedures and
controls designed to prevent adverse reputational damage, and how
updated policies increasingly reference the need for prioritisation of
scarce resources. This recognises that with service reduction and
curtailment, the likelihood of increased criticism of council services
remains at the highest level while the potential impact is also
unchanged at the present time.  In part this is based on it being
evident that service delivery challenges apply across the public
sector, and through various mechanisms including community
engagement, media reports nationally and locally, and complaints
responses there is an increased understanding of the challenges
faced.  
Risk Movement: increase/decrease/no change Risk Appetite:
The council endeavours to avoid reputational risk and is committed to
continuous improvement in the delivery of services either on its own or
with partners. It seeks to deliver these services having regard to its
equality duty and has set targets for doing so through a customer
charter. However, it is accepted that reputational damage is a potential
consequence of service reduction or cessation.
Controls:
A suite of policy, strategy, governance, organisational development,
project management and performance management measures are in
place to enable delivery of the services to a standard which mitigates
the risk of significant damage to the council’s reputation.
Consultation protocols established and range of consultation and
engagement with public and workforce carried out over period of time.
Customer charter in place and customer focus strategy developed to
Current and Proposed Mitigating Actions:
Ongoing review, redesign and implementation of policy, strategy
governance, organisational development, project management and
performance management.
Regular meetings with officers and inspection agencies to support and
challenge progress towards improvement.
Means of communicating changes impacting service users to be
monitored.Page 57

Page 58

Appendix 1
improve citizen engagements and provide a consistent experience
across services.
Formal complaints procedures in place.
Performance management reporting framework updated.
Corporate Management Team monitors external inspection processes
and outcomes.
Freedom of Information processes.
Risks fully considered in committee reports requiring a decision.
Suite of Governance and Scrutiny Documents in place and regularly
updated.
Improved outcome reporting of service delivery and linked
performance indicator measures.
Progress Transformation Programme to optimise service delivery
arrangements.
Page 58

Page 59

Appendix 1
7.
Description of Risk: Operational Continuity and Performance: The council is unable to deliver services or performance falls below
acceptable levels for a sustained period; insufficient business continuity planning; changes in working practices impact on service delivery.
Going forward it is recognised that operational continuity and performance may be affected as a consequence of service re-design and
changes in service delivery and challenges remain to ensure alignment of available resources to service delivery standards.
Lead: Corporate Management Team/ Heads of Service
Risk Rating: low/medium/high/very high
HIGH
Likelihood 4 x Impact 3 = Score 12
Rationale for Risk Rating:
The risk rating is an aggregate of various factors, services continue
work to remain resilient and minimise disruption; experience of
adapting to new ways of working has increased service flexibility yet
challenges remain. Performance is monitored but can be impacted in
certain areas should services be scaled back due to changes in
policy priorities; in such circumstances this risk requires continued
active management.  Overall, the position is improved since the prior
review; likelihood remaining unchanged at score 4, with potential
impact reduced from major (score 4) to moderate (score 3).
Risk Movement: increase/decrease/no change Risk Appetite:
The risk appetite acknowledges the responsibility the council has to
maintain delivery of statutory services and ensure the needs of the
vulnerable service users are met.
Controls:
List of critical functions agreed by Corporate Management Team
Programme for updating business impact assessments/business
continuity plans in place for critical services.
Organisational Development Team promoting workforce and
leadership development.
Communication strategy for informing service users of impending
changes to services developed.
Current and Proposed Mitigating Actions:
Review Performance Management Framework to ensure it aligns
appropriately to revisions to service provision in the Corporate Plan.
Progress reintroduction of the Public Service Improvement Framework
to optimise delivery of continuing services.
Review timetable for performance reporting aligning with reporting
framework for data collected as statutory performance information as
appropriate.
Progress Transformation Programme.Page 59

Page 60

Appendix 1
8.
Description of Risk: IT (Technological) Major disruption in continuity of ICT operations; data security is compromised. Changes in working
practices post pandemic more reliant on ICT infrastructure, capacity, and support. The risk of cyber-attacks remains and cannot be
eliminated, with attacks being nuanced over time and requiring the council to be constantly alert to new threats. The prevalence of working
from home results in greater isolation and increases the risk of malicious emails and data breaches. 
Lead: Corporate Management Team/ Depute Chief Executive (Education, Communities and OD)/ Head of HR, ICT and OD
Risk Rating: low/medium/high/very high
VERY HIGH
Likelihood 4 x Impact 5 = Score 20
Rationale for Risk Rating:
A recurring theme from senior management relative to their
experiences during the course of the pandemic is that the success of
their services in many respects is predicated on the availability of
robust and adaptable ICT systems. This creates an elevated risk that
has been recognised centrally, albeit it brings with it a number of
challenges in terms of resourcing changed ways of working both to
infrastructure and in terms of staffing to support that change as
required. Meanwhile cyber security continues to have a high profile,
and the ICT service has a suite of controls in place to mitigate known
risks in this area. Intelligence in relation to recent successful cyber-
attacks has highlighted that the disruption to the affected
organisations can be widespread, with any recovery process likely
to take a significant amount of time to restore business operations
fully.
Risk Movement: increase/decrease/no change Risk Appetite:
There is zero appetite for service interruption or data loss, as this has
the potential for catastrophic impact on service delivery and the cost
of system disruption or data protection breaches can be significant.
The security and continuity of ICT services is therefore of vital
importance, and this is reflected in the range of controls in place.
Controls: 
Corporate Information Security Policy. Senior Information Risk Officer.
External   accreditation   processes   for Network Security (Public
Services Network, Cyber Essentials Plus)
Environmental Controls for Data Centre (cooling, fire, flood, and
backup power)
Boundary Firewalls and Internet Gateways (email and web filtering)
Current and Proposed Mitigating Actions:
Information Security Policy review /update underway
Computer Use Policy to be refreshed.
Assess controls as part of plans for continuing development
of digital services.
Penetration testing for applications implemented to deliver
digital services.Page 60

Page 61

Appendix 1
Data control enhanced through network controls.
Malware Protection
Cyber resilience standards aligned to SG Cyber Resilience
Framework
Cyber Incident Response Plan
Patch management (Applications and Infrastructure)
Third Party Maintenance Agreements (Applications and
Infrastructure) 
Main financial system supported in-house.
Information Assurance Group
Records Management Policy
Data breach reporting arrangements
Working from home policy/guidance
Participation in the Scottish Government Cyber Resilience Programme
Extend accreditation process to include the Education ICT network.
Continue with implementation of programme of work to address
awareness raising, e-learning and phishing campaigns to educate
users of ICT systems– attempting to mitigate and reduce the ‘human
error’ element.
Complete the review of the ICT Business Continuity Plan
Cyber Resilience – ongoing monitoring and application of emerging
best practice
Continue to monitor feasibility of insurance cover for cyber-attacks.
Page 61

Page 62

Appendix 1
9.
Description of Risk: Economic Sustainability. Higher inflation and increases in interest rates have the potential to an impact on capital
projects including the Moray Growth Deal. The cost of doing business and higher energy costs adversely impact on the business community.
Increased strain on household incomes /budgets may impact on council tax revenues and income from council house rents; business failures
may create similar pressures on business rates. Many of these are factors outside the control of the council but continue to have an influence
on how it reacts and plans for the future.
Lead:  Corporate Management Team/ Depute Chief Executive (Economy, Environment and Finance)
Risk Rating: low/medium/high/very high
MEDIUM
Likelihood 2 x Impact 3 = Score 6
Rationale for Risk Rating:
The cost-of-living crisis, a reduction in the working age population,
housing, and childcare remain as potential impediments to economic
growth, with both the council and its partners actively working to
address these issues. The Local Outcomes Improvement Plan and
the Corporate Plan, underpinned by the ten-year Moray Economic
Strategy, guide investment priorities and involve significant input from
multiple council services including Planning, Housing and Education.
While some of the initiatives being taken forward will take time to
complete, the direction of travel is assessed as positive, allowing the
risk score to be reduced. 
Risk Movement: increase/decrease/no change Risk Appetite:
The need to maintain a vibrant economy is prominent in both
community and council strategic plans and there is a strong appetite to
create conditions that make Moray an attractive place to do business.
Controls:
Moray Growth Deal - Funding for Growth Deal being progressed
bringing total investment to the area of over £100m.
Growth deal governance arrangements in place and elements of
programme being delivered in line with timetable.
Moray Economic Strategy ten-year strategy developed with partners
and aligned to council strategic plans.
Current and Proposed Mitigating Actions:
Progress Growth Deal projects in line with programme.
Continue work with partners to develop and deliver support aligned to
economic strategy objectives that include:
 Increasing employment levels and number of companies
 Ensuring alignment between skills provision and the changing
economy
Page 62

Page 63

Appendix 1
Partnership working with Highlands and Islands Enterprise, Moray
College UHI, Skills Development Scotland and others.
Oversight of programmes using ring fenced funding from the UK
Shared Prosperity Fund, Just Transition Funding, and the Strategic
Priorities Fund.
Expansion of pre-school provision.
 Increased productivity leading to growing wages and
contributing to closing the gender pay gap.
 A labour market that provides the required numbers of workers
to take advantage of available opportunities-notably attraction
and retention of those aged 16-29.
 Maximising the environmental, social, and economic benefits of
the transition to net zero and Community Wealth Building.
Page 63

Page 64

Page 64

Page 65

Report to: Meeting
Date:
Corporate Committee 10 June 2025
Report by: Report No:Depute Chief Executive
(Education,
Communities and
Organisational
Development)
DCE(ECOD)001/25
Author: Denise Whitworth Contact
Email:
Denise.whitworth@moray.gov.uk
Subject: Transformation Strategy Development
1. PURPOSE
☒ For Decision      ☐  For Information
1.1 To ask the Committee to consider and note progress on the delivery of the Council’s
Transformation Strategy since the last report on 28 January 2025, as part of the
ongoing monitoring of progress.
1.2 This report is submitted to the Committee in terms of Section III (A) 2 of the Council's
Scheme of Administration relating to considering Capital and Revenue Budgets and
long-term financial plans.
2. SUMMARY
2.1 This report outlines the progress of the Council’s Transformation Strategy since the last
update in January 2025, outlining ongoing projects and future plans aimed at
enhancing financial sustainability and service delivery.
2.2 The report seeks the Committee's consideration of the progress made with the projects
in the Council's Transformation Strategy and notes projects that have encountered
delays for various reasons, including resource allocation issues.
2.3 Moving forward, the next steps are to report on the further development of the
transformation strategy by late autumn 2025.
3. RECOMMENDATIONS
3.1 It is recommended that the Committee considers and notes progress on the
delivery of the Council’s Transformation Strategy.
Denise Whitworth
Item 8.
Page 65

Page 66

Depute Chief Executive (Education Communities and Organisational
Development)
4. BACKGROUND AND CONTEXT
4.1 The Council at its meeting on 24 April 2024 agreed the first iteration of a new,
developing Council Transformation Strategy to take forward a continued focus on
delivering transformation projects already in progress, accelerate and expand where
there is opportunity and develop new areas of work to support the Council’s financial
sustainability, providing a sound foundation for future transformation work (para 9 of the
minute refers)
4.2 The Strategy agreed in April 2024 is made up of a programme of projects to continue
the council’s transformation journey.  These are categorised as new, innovation,
additional, expansion and current.  An update to the Strategy, including the
development of new projects was agreed by the Council on 13 August 2024 and this
also shows the links between the projects and the council’s corporate priorities (para 10
of the minute refers). 
4.3 The Transformation Strategy has developed to include the following projects which
were agreed to commence as noted below:
13 August 2024: LED Lighting; Solar Panels
22 October 2024: Out of Hours Service
21 May 2025: Depots review
4.4 Appendix 1 gives an update of progress on specific project areas to show the
development work that has taken place since the last update report in August.  A
summary of key points is given below.
i. Leisure review – the workshop held with councillors on 18 February provided
direction for the development of the review.  Work is underway with Moray
Leisure on options to provide Leisure services across Moray.  Consideration is
also being given to how best to manage assets and plan the capital programme
of works in this context.  It is planned to report on this in the autumn.
ii. Libraries review – consultation feedback was reported to the Council on
19 February 2025 (para 21 of minute refers).  Work is now underway with user
groups that have been established and there will be a report back to ECLS
committee on opening hours.
iii. Learning estate –engagement within all ASGs (associated school groups) now
underway, work on Forres Academy and future planning with the learning estate
have progressed with options being considered for Elgin and Buckie High
Schools in light of revised capital budget.  The outcome of the member Working
Group was reported to ECLS committee on 18 February.
iv. Depot review – draft project plan was agreed by the project Board and work is
underway on the full business case was reported to the Council in May 2025.
v. Education HQ and Schools Business Support projects are now moving forward
with a Project officer in place, having previously been reported as being on hold
for some time.
Page 66

Page 67

4.5 However, there are a small number of projects where progress has been less
consistent and these are highlighted as red or amber on the schedule in Appendix 1. 
These are mainly due to issues of resourcing, either where arrangements are yet to be
put in place or where limited specialist resources had to be diverted to operational
priorities to ensure service continuity.  These include: schools business administration
(which will now move on as noted above), schools digital and service efficiency lean
project.  Resourced have also been allocated to address the pressures in ICT and so
these projects are expected to move on once the arrangements are in place. The
learning estate work remains amber for different reasons related to the challenges of
budget pressures for capital projects of this nature and decisions that have affected the
originally planned timescales, such as the timing for LEIP 3 decision.  These latter
points will be addressed through the affordability work noted and a review of project
timescale to take account of the factors influencing progress, which has been reported
to ECLS Committee.
4.6 It is recognised that Stage 3 of the development of the council’s transformation strategy
will require further substantial work, including identifying approaches that could be
considered for the Future Council.  This will also take account of the enabling potential
of transformation work that could underpin future change and efficiency and have
indirect financial benefits, ensuring the sustainability and effectiveness of council
services for the future.  This has progressed with a workshop held with members and
senior officers on 18 March and a further workshop with the Leadership Forum of
Service Managers is being held on 11 June 2025.
4.7 The outcome of the workshop on 18 March has been circulated to members for
information outside of the committee process because it is not a final outcome but will
be considered alongside the feedback from the council Leadership Forum (made up of
Service Managers) to influence the transformation proposals that are brought before
council in the autumn.  However, the workshop feedback was that the Council must
balance 3 elements: empowered communities; sustainable places, and smarter internal
systems.  Elected members and senior managers envisioned a future where:
 Communities shape their services through strong local democracy.
 Infrastructure and planning decisions reflect long-term community well-being.
 Council staff and systems are responsive, tech-enabled, and human-centred.
4.8 The proposed next steps for the development of the transformation strategy are to
consider the outcome of the workshops and to undertake further planning on the
development of the strategy and plans and to report to the Council in late autumn 2025
on the way forward.
5. PROPOSALS
5.1 It is proposed that Committee considers and notes progress on the delivery of the
Council’s Transformation Strategy
6. SUMMARY OF IMPLICATIONS
6.1 The table below shows whether risks and implications apply if the recommendations
are agreed:
SUBJECT YES NO
Page 67

Page 68

Corporate Plan and 10 Year Plan (Local Outcome Improvement
Plan)
√
Policy and Legal √
Financial √
Risk √
Staffing √
Best Value and Transformation
Property √
Information Communications Technology/Digital
Equalities. Social Inclusion and Economic Impact           √
Climate Change and Biodiversity Impact √
6.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans.
The new Transformation Strategy is the development of the Council commitment in
the Corporate Plan to the values of Ambitious: ensuring sustainable and efficient
services; and Improving: drive improvement, encourage innovation and invest in
transforming to meeting future needs and forms the Transformation Strategy referred
to in the Strategic Delivery Framework.
The transformation strategy and projects contribute to the Council’s priorities of
tackling poverty and inequality, building stronger greener vibrant economy and
building thriving, resilience empowered communities.  The projects also support the
strategic delivery framework of the financial strategy workforce strategy and digital
strategy.
a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following
Council Plan strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population
6.3 Policy and Legal
None.
6.4 Financial
The financial implications of the Transformation Strategy have been approved in
previous reports.  The table below has been updated to include the changes approved
by the Council on 13 August 2024 and tracks the investment and savings generated
Page 68

Page 69

since the programme was started in 2018 (as the Improvement and Modernisation
Programme (IMP)).  However, due to the short period of time and pending completion
of year end financial position, there is no update to report on the financial implications
since the report to this committee on 28 January 2025.
Project Cost 2018
-2024
£000s
Budget
cost
2024/25
£000s
Actual
Savings
2018-2024
£000s
Actual
savings
2024/25
£000s
Future
projected
savings
£000s
Total
projected
savings
£000s
IMP 1,104 1,279 1,279
BIM 11 -
ASN
Review
596 289 - -
Just
Transition
30 - -
School
Business
Support
29 -
Learning
Estate
ESO (Note
1)
22 Not
quantified
yet
Smarter
Working
72 54 68 122
Depot and
Stores
review
76 To be
reported
June
LED
lighting
and solar
panels
326
250
87
40
87
40
Note 1: the cost here is approved as additional to the core cost of the Learning
Estate team
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend
this Year
Virement
From
Other
Comment
s
- - - - - -
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable
)
Other
Comment
s
- - - - - -
6.5 Risk
Page 69

Page 70

The risks associated with the transformation programme are managed through the
relevant programme boards and overseen by CMT/SMT.  There are no changes to the
current risk profile and it is noted that, with reporting of the first iteration of the new
Transformation Strategy, progress is being made in maintaining pace which has
previously been noted as a risk.  However, the risks associated with change and the
success of transformation remain and will continue to be monitored.
In order to manage these risks, the Council will:
i. Ensure that all projects meet a given standard of governance that is
proportionate to the change.
ii. Ensure there are adequate resources for the overall programme of work and for
individual projects.
iii. Manage the dependencies and interdependencies across the scope of the
change and its implications for other areas of prioritised work.
iv. Appoint appropriate project resources and failing which, review whether
objectives are deliverable and review planned work accordingly.
6.6 Staffing
There continue to be challenges in securing resources and service capacity to progress
projects.  However, the allocation of specific project resources to specific projects is
showing impact with projects such as smarter working and learning estate showing
good progress.  This approach will be built upon as projects are identified and reach an
appropriate stage.  Resourcing at Council level including corporate programme
management and oversight will be revisited as the next stages of the Transformation
Strategy work and the council management structure emerges.
6.7 Best Value and Transformation
The Transformation strategy aims to deliver council transformation
6.8 Property
No direct implications from this report, although property is the subject of one of the
workstreams and is impacted by the Energy projects.  The issues arising from this will
be reported in due course with activity on climate change being progressed as a stand-
alone programme of activity.
6.9 Information Communications/Technology/Digital
There are no Information Communications/Technology/Digital implications from this
report.
6.10 Equalities, Social Inclusion and Economic Impact
For the purposes of this report an Equality and a Socio Impact Assessment are not
required, however it is acknowledged that various workstreams will identify change that
will have an impact on equalities and socio economic considerations and will be
reported in due course.
6.11 Climate Change and Biodiversity Impacts
There are no immediate climate change implications directly arising from this report.
However, the energy projects make a contribution to future environmental sustainability
and climate change. This is reported in the report relating to these specific projects.
Page 70

Page 71

7. CONSULTATION
7.1 This report has been prepared in consultation with the Extended Corporate Leadership
team who have been involved in the ongoing development of the transformation
programme, including as the project initiation board reviewing new mandates and
driving forward specific project work. They have contributed to the project updates in
Appendix 1 and any comments made have been incorporated into the report
8. BACKGROUND PAPERS
8.1 Reports updating on progress on Improvement and Modernisation Programme to:
12 May 2021 Full Council (Item 09 Report and Appendix A / B / C / D / E )
8.2 15 September 2021 Full Council (Item 15 Report and Appendix 1 / 2 / 3)
8.3 15 March 2022 Corporate Committee (Item 13a Report and Appendix)
8.4 30 August 2022 Corporate Committee (Item 06 Report and Appendix )
8.5 25 April 2023 Corporate Committee (Item 08 Report and Appendix)
8.6 7 November 2023 Corporate Committee (Item 07 Report and Appendix 1 / 2)
8.7 23 April 2024 Corporate Committee (item 06 Report ) and Appendix)
8.8 24 April 2024 Special Full Council (item 04 Report and Appendix 1 and Appendix 2)
8.9 13 August 2024 Full Council (item 6a Report and Appendix 1 and Appendix 2
8.10 5 November 2024 Corporate Committee (item 16 Report and Appendix)
8.11 28 January Corporate Committee 2025 (item 09 Report and Appendix)
Page 71

Page 72

Appendix 1
Transformation Programme Update: to 30 April 2025
(Report to Corporate Committee June 2025)
Project
Titles:
Phase
Schedule
Budget
Objectives
%
complete
Progress Update Next Steps
TRANSFORM EDUCATION
Leisure
Review
Definition
Not yet
developed
Workshop held with members on future service 18/2 to
consider way forward and issues from external report. 
Discussions progressing with MLC to explore options and
facilitated workshops planned to develop relationships and
consider Moray wide solutions.   Planning also underway with
Property Services on asset management and proposed capital
works
Members briefing on report held Jan 2025
Moray-Wide Leisure services external report was received. 
The report contains extensive information and date for
consideration in relation to future service options.
Transformation Workshop was held to consider future service
design – Sept 24 – completed,
Future service design was considered at Members Workshop
on 21-08-24
Consideration of asset
management and capital
programme
Report to Council on future
options following workshop
(date tbc)
Page 72

Page 73

Project
Titles:
Phase
Schedule
Budget
Objectives
%
complete
Progress Update Next Steps
Libraries
Review
Definition
Not yet
developed
Reported to council for decision on future service 19 Feb 25. 
No substantial change to service.  Work with communities on
opening hours and potential for future co-location of services.
Public consultation on proposed future service design took
place in Nov and to be reported to council in Feb 25
Council report considered at council on 22-10-24 and future
service design approved for consultation
Transformation Workshop to consider future service design –
Sept 24 – completed, future service design considered at
Members Workshop on 21-08-24
Update report to service
committee (ECLS) on
progress of user groups
and opening hours 
Education
HQ
Business
Admin
Support
Team
Delivery AMBER GREEN GREEN
20 Following considerable delay due to lack of resources, a
Project Officer was recruited and the project has moved on.
Project moved from definition to delivery Savings have been
achieved through vacancy management
Work commenced on process review, however, stalled due to
resourcing. 
Complete lean process
review and design new
procedures
Page 73

Page 74

Project
Titles:
Phase
Schedule
Budget
Objectives
%
complete
Progress Update Next Steps
Raising
Attainment:
Well-being
(ASN)
D
GREEN GREEN GREEN
80
SEBN Change Management: almost complete with posts being
advertised to support the Flexible Learning Resource East and
West. East End annexe flexible provision developing.
Moray Adapted curriculum – there are currently 14 providers
on the flexible framework with one awaiting approval.  The
providers will have a meeting with officers soon and this will
also be an opportunity to meet head teachers.
ASN Parent engagement: handover to back to the service to
occur.  A parent from the group is assisting with HT Inclusion,
Wellbeing and Adapted Curriculum recruitment.
Policy Guidance and review has not progressed due to
capacity to deliver other progress updates
CMPs for SES and EAL services have been completed
CARE governance group continues to meet with close links
with SW – a number of children and young people who were
causing concern have been removed from the list due to
positive interventions
Once appointed set up
outreach service for East
and West
Continue to encourage
providers to come on to the
framework
HT post to be advertised
and go through recruitment
process
Continue to engage with
parents and consider move
to Support group to include
a range of parents across
Moray
Plan to be developed over
summer
Continue to monitor the
work of this group including
consideration of ELC
children
Page 74

Page 75

Project
Titles:
Phase
Schedule
Budget
Objectives
%
complete
Progress Update Next Steps
Service is moving from BSS to CALM to support behaviour
where trainers have been trained and are now being trained as
Associates so that they can deliver training locally. 
Parent Carer survey has been closed and is currently being
analysed
ASN forecasting tool is being developed and trialled
Early years allocating model has been reviewed and is
currently being piloted.
Teacher Trainers to develop
introduction to CALM to be
rolled out with other
mandatory training in
August
Report to be compiled and
summary to be included in
next update to ECLS
To be included in next
update to ECLS
To be included in next
update to ECLS
Business
Support for
Schools
(Schools
Business
Admin)
Delivery
RED AMBER AMBER
65 Following considerable delay due to lack of resources, a
Project Officer was recruited and the project has moved on. A
project plan is in place to take forward the actions agreed by
ECLS and Council and to address feedback on both the
Change Management Plan and Improvement Plan.  It is
planned to report the outcome of the project to ECLS in
Sept/Nov.
Report to ECLS Committee
in Autumn 2025
Page 75

Page 76

Project
Titles:
Phase
Schedule
Budget
Objectives
%
complete
Progress Update Next Steps
Raising
Attainment:
Curriculum
Breadth -
Digital
Inclusion
Delivery
RED GREEN GREEN
50 Apr 25:  All iPads purchased since the change of MDM have
been fully onboarded.
ICT have broadened the target schools away from ASGs as
some schools are unable to release their iPads due to installed
Apps or files and photos that need to be removed.
Overall Project Status RED: work delayed due to deployment
of resources to management of pressure on network
connections
Dec 24 : All schools have been sent instructions to part enrol
devices to allow internet access.  All iPads ordered since
enrolled as managed devices.
The enrolment of devices as fully managed will not be a quick
as first thought due to iPads iOS being so out of date and
school bandwidths meaning ICT are unable to update on site.
As well as some iPads being locked by users this has resulted
in all devices having to come back to HQ to be updated and
fixed prior to full enrolment. This was an unforeseen issue
which will slow down the implementation of fully enrolled
devices.
Apr 25: Continue
scheduling in the remaining
schools for iPad collection
and full enrolment.
Some schools are being
scheduled for the summer
break.
Rollout all iPads from ICT
that have been purchased
since the MDM change –
Target Date Jan 25
- Complete the
implementation of fully
managed devices for Elgin
ASGs – target date is Feb
25
- schedule in the remaining
ASGs for iPad collection
and full enrolment once
Elgin ASGs are completed.
Forres, Speyside, Milnes,
Buckie & Keith
Page 76

Page 77

Project
Titles:
Phase
Schedule
Budget
Objectives
%
complete
Progress Update Next Steps
Page 77

Page 78

Project
Titles:
Phase
Schedule
Budget
Objectives
%
complete
Progress Update Next Steps
Schools for
Future -
Learning
Estate
review
AMBER AMBER GREEN
5% Schedule remains amber overall as there have been several factors
influencing the originally planned timescales.
o Findrassie – project continues to be on hold due to updated
roll forecasts. Not a “named” project so currently no
commitment of funding in the current 10 year capital plan.
Current school Roll Forecast indicates that a smaller scale
project (extension of current schools) but awaiting
independent assessment of SRF methodology
o Forres Academy – public consultation on common good in
progress completed in Dec and reported to Council in Jan 25
recommending to progress legal process to use common
good.  KC appointed and awaiting dates for Court of
Session. RIBA Stage 2 (Concept Design) updated costs are
£2.5m over budget – working to reduce to affordability cap
£87.5m.
o Elgin High School Capacity Extension project paused for up
to 12 months to determine the validity of the current
requirement. Awaiting independent assessment of SRF
methodology to inform recommendation for next steps
o Buckie – Current new build and refurbishment options are
affordability within capital plan. Considering number of
actions to support affordable short, medium and long term
sustainable options. Report to ECLS Committee 13-05-25
o B-B Upgrade work – timing to be adjusted for affordability
extending programme to 15 years and developing a risk
approach to works prioritisation across a minimum of 
Review of projects to take
account of capital plan
affordability and projected
rolls (Nov 25)
Page 78

Page 79

Project
Titles:
Phase
Schedule
Budget
Objectives
%
complete
Progress Update Next Steps
o Crossroads – Following public consultation in Oct 24/25
report recommending closure of school to ECLS committee
on 13-05-25 and Council 21-5-25
Reduction of 3-year capital budget by £32.4m – together with
additional reduction across the current 10 year capital plan -
adds to the ongoing affordability challenge with delivery of all
Core projects (BB-Upgrade, Elgin N & S primary school
capacity expansion and ASN infrastructure)
ASG Engagement – All Associated school groups (ASG) –
except Lossiemouth ASG completed (due end of May)
underway.  ASG reports in progress with planned full report to
Committee in Nov 25
Working Group – concluded review of information and outcome
reported to ECLS on 18 Feb 2025.  Recommendation was no
acceleration but to update relevant policies to support future
review.
Transformation Workshop held 21-08-24 to consider future of
this project re whether to accelerate and extended to deliver
fewer Schools operating at greater levels of occupancy and
efficiency.  Working group now agreed by ECLS Committee on
17/09/24 and work underway. Working group has concluded
Page 79

Page 80

Project
Titles:
Phase
Schedule
Budget
Objectives
%
complete
Progress Update Next Steps
and based on outcomes, necessary reporting will be to ECLS
committee rather than council in February.
TRANSFORM COUNCIL
Page 80

Page 81

Project
Titles:
Phase
Schedule
Budget
Objectives
%
complete
Progress Update Next Steps
Digital
Services
Research
Not yet
developed
Apr 25: The approach to the Digital Strategy is being reviewed
to identify potential projects, quick wins, and future-focused
initiatives to leverage digital advantages for Moray Council. 
This includes engaging with various providers to understand
their offerings and narrow down suitable options.
Microsoft's AI offering, Copilot for Microsoft 365, is currently
being piloted with 75 users across the Council, including senior
management.  The goal is to evaluate the tool's value and
make an informed decision about further investment.  The pilot
will run until the end of June and focuses on three specific use
cases: meeting minutes, job application shortlisting, and
consultation analysis.  Several introductory sessions have
been conducted to familiarise users with the tool's capabilities.
Apr 25: Proposed approach
to be finalised and
mandate/OBC and report
drafted.
Report to Committee on
proposed strategy
Work has continued to evaluate the market in order to refresh
the business case to replace the legacy CRM system. Efforts
are also underway to procure a replacement for the CareFirst
system.
Digital strategy in draft and scheduled for CMT consideration
and reporting to committee in 2025
Workshop facilitated by Digital Office and Socitm held on 3/7.
Dec 24 Update: early approach drafted, needs further work.
Development sessions planned for early 25 to inform thinking
on themes and Council approach.
Page 81

Page 82

Project
Titles:
Phase
Schedule
Budget
Objectives
%
complete
Progress Update Next Steps
Service
Reviews
Concept
Not
yet
develo
ped
This area does not have resource allocated and is impacted by
other workloads
Early discussion paper prepared and further development
required.  May present methodology to advance emerging
agendas such as digital, lean and sustainability
Management consideration
of concept and potential
benefits
Workforce
Changes
Concept
Not
yet
develo
ped
Apr 25: Report to Corporate Committee on 22/4 agreed on
proposed approach.
Proposed negotiating strategy drafted and being further
developed following political steer ahead of reporting to
council. Further work to define benefits underway
Outline business case being prepared to establish as project.
Transformation Workshop to consider future of this project held
on 21-08-24
Dec 24: further calculations developed and considered by
CMT.  Initial interaction with TUs for confidential soundings
undertaken. Refinement of Council position underway for
achievable actions.  Way forward to be considered by CMT
taking account of updated revenue budget position which
enables a wider range of options and does not require to be
reported in Feb 25. 
Apr 25: develop proposals
and potential savings
based on w/f data. 
Detailed project plan to be
developed.
Page 82

Page 83

Project
Titles:
Phase
Schedule
Budget
Objectives
%
complete
Progress Update Next Steps
Out of
Hours
Services
Delivery
Green Green Green
75% Business case finalised and approved at Council to progress in
October 2024.
Project mandate prepared and agreed by CMT/SMT as project
initiation.
Work well underway with expected completion on target in July
25
Finalise scripts with
Aberdeenshire council and
move across to new
system.
Customer
Service
and
systems
support
Business
green Amber green
20% Revised business case, seeking authority to tender for a new
system to go through June committee cycle. To identify
resource and major project timelines for completion by Aug 26
Report business case to
Full Council on 25 June for
approval.
Asset
Managem
ent (was
PAMA)
Delivery
N/A £83K
£200K
Rev.
£250K
Cap.
saving
80%
Page 83

Page 84

Page 84

Page 85

Report
to:
Meeting
Date:
Corporate Committee 10 June 2025
Report
by:
Report No:Depute Chief
Executive (Economy,
Environmental and
Finance)
FIN005/25/SW
Author: Suzanne Wilson Contact
Email:
performance@moray.gov.uk
Subject: Performance Report (Financial Services) – Period to March 2025
1. PURPOSE
☒ For Decision      ☐  For Information
1.1 The purpose of this report is to scrutinise performance in areas of Service
Planning, Service Performance and other related data to the end of
September 2024 and note actions being taken to improve performance where
required.
1.2 This report is submitted to Committee in terms of Section III (A) (4) of the
Council’s Scheme of Administration to monitor performance in accordance
with the Council’s Performance Management Framework.
2. SUMMARY
2.1 At the end of March 2025, overall progress against the 2024/25 Service Plan
was 72% complete with most actions to be carried forward for completion into
the 2025-2028 Service Plan.  Progress against current Service Plan Priorities
and Indicators and operational Service Performance Indicators is presented
in the table and charts below –
Item 9.
Page 85

Page 86

3. RECOMMENDATIONS
3.1 It is recommended that Committee scrutinises and notes performance
in areas of Service Planning, Service Performance and other related
data to the end of March 2025 and notes actions being taken to
improve performance where required
Author Name Suzanne Wilson
Job Title Research and Information Officer
4. BACKGROUND AND CONTEXT
4.1 Each service plan sets out the planned strategic and service level priorities
and outcomes it intends to deliver in the coming year aligning closely with
financial planning, corporate and community planning partnership strategic
priorities.  
4.2 Progress on Service Plan priorities and outcomes and key areas of
operational performance is reported by exception, highlighting successes
and giving assurances around the challenges and actions to support.  Links
to Service Plan Actions and Performance Indicators can be accessed within
the background papers section of this report.
4.3 Complaints are reported in terms of time taken to respond, outcomes and
learning points.  Links to Complaints tables can be accessed within the
background papers section of this report.
4.4 Latest Local Government Benchmarking Framework (LGBF) results for
2023/24 are published throughout the year with final results publication and
Page 86

Page 87

data refresh in June.  The full suite can be viewed via the LGBF Dashboard.
Published indicators for this service have been incorporated with the
relevant section of this report depending on whether used to evidence
progress against strategic, service level or service performance priorities. 
LGBF indicator targets and RAG status in the backing tables is now based
on ranking thresholds aligning with exception reporting.
4.5 The Sustainable Development Statement was approved by the Corporate
Committee on 5 November 2024 (para 16 of the Minute refers).  The
Statement draws out the way in which sustainable development is
embedded in the Corporate Plan 2024-29 and wider corporate policies,
strategies and plans with progress being reported through several updates
and reports, one of which is quarter 4 performance reporting.  Service Plan
actions and indicators that underpin the delivery of Sustainable
Development Goals are highlighted in backing table documents and
comment where relevant is incorporated in this report.  An overview of
progress will be presented in the Corporate Plan progress update in due
course.
5. PROPOSALS
Successes – Service Plan Strategic and Service Level Outcomes and
operational Service Performance
5.1 Following agreement at the Council meeting on 22 October 2024 for the
operation of a cap on capital expenditure (para 9 of the Minute refers), the
latest financial plans have been approved by Council; the Medium to Long
Term Financial Strategy (4 December 2024, para 10 of the Minute refers)
and the Capital Plan (21 January 2025, para 7 of the Minute refers). 
Financial Planning will continue as a Strategic action within the 2025-2028
Service Plan.  (Strategic Level Action FIN24-25 Strat 4.1)
5.2 Partnership work to develop financial management arrangements with the
Moray Integration Joint Board is complete with the Revenue Budget and
Recovery Plan 2025/26 and a Medium Term Financial Plan approved by the
Board on 27 March 2025 (items 7 and 8 of the agenda refers).  The
Recovery Plan included a proposed savings delivery plan developed with
Moray Council input.  (Strategic Level Action FIN24-25 Strat 4.2)
5.3 The Health at Work policy and revised absence management procedures
are followed by all service managers.  For any complex issues, a proactive
approach has been taken including temporary changes to working
arrangements if required.  Absence will continue to be monitored as part of
the 2025-28 Service Plan now baseline data has been established. 
(Service Level Action FIN24-25 Serv 5.9, Service Level PIs FS201 and
FS201a)
Challenges and actions to support – Service Plan Strategic & Service
Level Outcomes and operational Service Performance
5.4 A new approach has been agreed for reporting Participatory Budgeting (PB)
with Accountancy liaising directly with services to confirm activity and
Page 87

Page 88

spend.  During the reporting period, playparks have been installed at
Tomnavoulin and Letterfourie with consultations undertaken for parks in
Hopeman and Forres, however spend remains below target at £218,000;
10% of the total budget subject to PB activity.  Work to further develop PB is
included within the 2025-2028 Service Plan.  (Strategic Level Action FIN24-
25 Strat 4.3, Strategic Level Pis FS215, FS214 and ERC006a)
5.5 Although both actions relating to Procurement are reported out with target
timescales, good progress has been made with planned work nearing
completion.  The new Procurement support model for example has been
well received with dedicated officers working with services to provide
continuity and reduce backlogs.  Work relating to the Procurement Strategic
Action Plan will continue as part of the 2025-2028 Service Plan.   (Service
Level Action FIN24-25 Serv 5.2 and 5.5)
5.6 Implementing actions from the Annual Audit Report is 90% complete against
a due date of September 2024.  An update was provided by the External
Auditor to Council on 22 October 2024 (para 6 of the Minute refers) with
work planned to continue as part of the 2025-2028 Service Plan.  (Service
Level Action FIN24-25 Serv 5.3) 
5.7 Due to resourcing issues, only one of the four actions assigned to Finance
within the Corporate Asset Management Plan, is complete.  Work will
continue as part of the 2025-2028 Service Plan.  (Service Level Action
FIN24-25 Serv 5.4)
5.8 Work on the digitisation of Taxation processes is 90% complete.  Direct
Debit sign up, change of address and single person discount applications
are now online and establishing best practice in relation to the automation of
Non-Domestic Rates is complete.  Work to complete the digital process will
continue within the 2025-2028 Service Plan.  (Service Level Action FIN24-
25 Serv 5.6) 
5.9 Increasing efficiency and availability of digital processes for Accounts was
originally planned as part of the Transformation Strategy Service Efficiency
Lean reviews.  With these reviews on hold to be reprioritised, this action will
be carried forward in the 2025-2028 Service Plan.  (Service Level Action
FIN24-25 Serv 5.7)
5.10 Following improvement last year, latest LGBF data reports performance on
the percentage of invoices sampled that were paid in 30 days remains at
89.4% for the year ended 31 March 2024.  This moves Moray back into the
lowest quartile and below the national average of 93.1%. Overdue invoices
continue to be highlighted to Heads of Service via quarterly reports and
faster processing times have been noted following the implementation of the
Accounts Payable e-form.  Local data for this should be available shortly.
(Service Performance PI CORP8)
5.11 No change is reported in the affordability indicator Ratio of Financing Costs
to Net Revenue Stream (General Fund), with Moray remaining in the lowest
Page 88

Page 89

quartile at 8.7% and above the national average of 5.8%.  Prudential
Indicators were reported to Council on 26 February 2025 (item 5, Appendix
3 of the agenda refers) with the acknowledgment higher percentages over
the next few years are factored into current financial planning and reflect the
ongoing requirement to increase borrowing to fund capital expenditure in the
capital plan, particularly in the Learning Estate and Moray Growth Deal. 
(Service Performance PI SFINSUS03)
5.12 Actual outturn as a percentage of budgeted expenditure has continued to
improve however Moray Council remains in the lowest quartile at 97.1%;
against a national average of 99.6%.  The impact of the retrospective
element of the service concession flexibility was not budgeted for.  This is
one-off purely accounting entry and has no effect on the cash position of the
Council.  (Service Performance PI SFINSUS05)
Complaints and MP/MSP Enquiries
5.13 A total of eight complaints were received during the first half of 2024/25
while ten complaints were closed.  Six complaints were resolved as
Frontline with four at the Investigative stage.  Four complaints were either
upheld or partially upheld.  Target timescales were met for Frontline
complaints with an average of 4.5 days for a response.  Investigative
complaints were slightly above target at 22.25 days.  For those complaints
upheld or partially upheld, a payment error was rectified and staff reminded
of correct procedures.  Software has also been updated to ensure all
options are available online in relation to council tax.
5.14 Financial Services received five MP/MSP enquiries during the second half
of 2024/25.  All five related to council tax issues. 
Other Performance (not included in the Service Plan)
5.15 Nothing to report.
Case Studies
5.16 Nothing to report.
Consultation and Engagement
5.17 As part of Financial Planning work, extensive community engagement was
undertaken around budget proposals including potential increases in council
tax and service charges.  Responses received were considered as part of
the budget setting process.
6. SUMMARY OF IMPLICATIONS
6.1 The table below shows whether risks and implications apply if the
recommendations are agreed:
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement
Plan)
X
Page 89

Page 90

Policy and Legal X
Financial X
Risk X
Staffing X
Best Value and Transformation X
Property X
Information Communications Technology/Digital          X
Equalities. Social Inclusion and Economic Impact X
Climate Change and Biodiversity Impact X
6.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP))
Improved Collaborative Leadership, as part of continuous improvement
through Best Value, will better enable the Council to fulfil the ambitions set
out in its strategic plans.
a) Links to Council Corporate Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the
following Council Plan strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.
b) Links to Local Outcomes Improvement Plan – The proposals in this
report support and contribute to improved outcomes for communities
as outlined in the following local Outcomes Improvement Plan
priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in  
Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population
6.3 Policy and Legal
The Council has a statutory requirement to publish a range of information
that will demonstrate that it is securing best value and assist in comparing
performance both over time and between authorities where appropriate.
6.4 Financial
None arising from this report.
6.5 Risk
None arising from this report.
6.6 Staffing
None arising from this report.
6.7 Best Value and Transformation
Page 90

Page 91

How councils plan for, manage and report on performance is a key area of
focus in external audit work, particularly on best value.
6.8 Property
None arising from this report.
6.9 Information Communications/Technology/Digital
None arising from this report.
6.10 Equalities, Social Inclusion and Economic Impact
None arising from this report.
6.11 Climate Change and Biodiversity Impacts
None arising from this report.
7. CONSULTATION
7.1 This report has been prepared in consultation with the Head of Financial
Services and relevant Service Managers and any comments made have
been incorporated into the report.
8. BACKGROUND PAPERS
8.1 Service Plan Actions
Service Plan Performance Indicators
Service Performance Indicators
Service Complaints
Page 91

Page 92

Page 92

Page 93

Report to: Meeting Date:Corporate Committee 10 June 2025
Report by: Report No:Depute Chief Executive
(Economy, Environment
and Financial)
FIN004/25/LP/LM
Author: Rhona Gunn/Lorraine
Paisey
Contact
Email:
lorraine.paisey@moray.gov.uk
Subject: Financial Services Service Plan 2025-28
1. PURPOSE
☒ For Decision      ☐  For Information
1.1 To invite the Committee to consider and approve the Financial Services Service Plan
for 2025-28.
1.2 This report is submitted to Committee in terms of Section III (A) (4) of the Council’s
Scheme of Administration relating to monitoring performance of the services within the
Committee’s remit in accordance with the Council’s Performance Management
Framework.
2. SUMMARY
2.1 Service Plans have been prepared identifying the improvement targets for 2025-28.  In
preparing the plans, managers have taken account of risk, performance data, the Local
Outcome Improvement Plan (LOIP), the Corporate Plan and other relevant factors such
as audit and inspections outcomes.  The Service Plans also identify the resources
allocated to each service.
The main items in the Financial Services Service Plan for 2025-2028 arise from the
Best Value Action Plan (strengthening capital monitoring, improving revenue
forecasting and further developing Participatory Budgeting) and from the requirement
to implement International Financial Reporting Standard (IFRS) 16, regarding
accounting for leases.  Efficiencies from digital service improvements are also included,
in line with the Transformation Strategy
3. RECOMMENDATIONS
3.1 It is recommended that Committee consider and approve the Service Plan for
Financial Services for the year ahead in Appendix 1.:
Lorraine Paisey
Chief Financial Officer
Item 10.
Page 93

Page 94

4. BACKGROUND AND CONTEXT
4.1 Service planning is a key aspect of the Council’s Performance Management
Framework and is undertaken annually to set out the strategic direction for services
over the coming months. 
4.2 It should be noted that actions from the Best Value Action Plan, agreed by the
Corporate Committee on 23 April 2024 (para 6 of the minute refers) will be monitored
and reported out with the Service Plan process.
4.3 The service planning process focuses on forward planning for medium-term activities
supporting delivery of the Local Outcomes Improvement Plan (LOIP) and Corporate
Plan.  The Council’s planning process also includes team plans that focus on short
term tactical and operational activities supporting delivery of the Service Plan and
strategies and Employee Review and Development Plans (ERDP) and Professional
Review and Development (PRD) plans provide individual planning for employees’
activities and development.
4.4 As well as identifying service developments and improvements, the Service Plan
Framework requires an assessment of the output and outcome requirements for
services based on the Council’s priorities, statutory and regulatory requirements and
other relevant local and national direction and makes use of improvement tools for
planning and continuous improvement.  Services are planning to support their
improvement work with the Public Sector Improvement Framework (PSIF), which the
Council is in the process of re-invigorating for relevant services.  Across services,
priority outcomes are those included in the Council’s Corporate Plan 2024-29 that
directly relate to the service or are influenced by the service and should be clearly
identified.
4.5 Setting clear measurable outcomes and defining key indicators by which progress will
be assessed continues to be an area for development within the Council.  However, it
is recognised that for some actions it can be difficult to identify a measurable outcome
(e.g. a change in legislation that must be implemented or updating a policy framework).
Therefore, as far as possible efforts have been made to set measurable outcomes for
service plan actions but in some cases outputs and key progress milestones have been
used so that it is still possible to measure whether the action has been progressed as
intended.
4.6 A summary of progress is given below for the services based on the performance
monitoring carried out throughout the year by the service and reported to committee as
part of performance reporting.  Further information on performance at the end of
Quarter 4 is included in the service Performance Report that is also on the agenda of
this Committee.  The Performance reports note where there is a carry forward of
actions from the previous service plans into the 2025/28 plans.
4.7 It should be noted that while there will be some re-organisation of teams and alignment
of services as a result of the management restructure, service plans have been
prepared taking account of council priorities, national priorities and ongoing and
emerging service priorities.  Therefore, it remains appropriate to seek approval for the
annual refresh of service plans to ensure that they continue to reflect the next iteration
Page 94

Page 95

of priorities and direction from committee and that services are appropriately directed
and tasked.
5. PROPOSALS
5.1 The focus of the plan is for 2025-26 although the service has set high level priorities for
a three-year period 2025-2028 with actions being reviewed annually. 
Financial Services
5.2 Progress on planned work for 2024/25 (success)
 Improved financial reporting for Moray Growth Deal with reports meeting target
timescales.
 Workforce planning tasks complete including recruitment for new trainee
position.
5.3 Progress on planned work (areas for development/not delivered)
 Service efficiency work in relation to Taxation and Accountancy has been slow to
progress due to other priorities and reduced staff resources with the service and
in supporting service areas.
 Participatory Budgeting has continued this year with projects for Open Spaces,
Active Travel and Arts & Culture but expansion of the process is required.
5.4 Planned focus in new plan (reflecting above and challenges to come)
 Strengthening the financial planning and management process to ensure
provision of clear, accurate and timely information and sustainability of future
service provision in line with the Best Value Action Plan, focusing on capital
monitoring and revenue forecasting.
 Implementation of IFRS 16 for financial year 2024/25 reporting.
 Further development of Participatory Budgeting.
 Implementing the Procurement Action Plan and assigned tasks from the Corporate
Asset Management Plan.
 Further efficiency work in relation to the digital approach for Taxation and
Accountancy.
 Tendering and contracting for a new financial management system.
5.5 The service plan is attached as Appendix 1.
6. SUMMARY OF IMPLICATIONS
6.1 The table below shows whether risks and implications apply if the recommendations
are agreed:
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement
Plan)

Policy and Legal 
Financial 
Risk 
Staffing 
Best Value and Transformation 
Property 
Page 95

Page 96

Information Communications Technology/Digital           
Equalities. Social Inclusion and Economic Impact 
Climate Change and Biodiversity Impact 
6.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans.
a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following
Council Plan strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☐ Improving wellbeing of our population
6.3 Policy and Legal
None arising from this report.
6.4 Financial
None arising from this report.
6.5 Risk
There are potential risks around progress in all priority areas due to staffing pressures
and which often has an impact on officers.
6.6 Staffing
There are no staffing issues.  The service plan actions will be accommodated within
existing resources.
All services have undertaken workforce planning to consider how best to prepare and
manage the workforce for the services to be able to respond to the agreed Council
priorities in the Corporate Plan and the service work that is required to support and
achieve those objectives.   Consideration has also been given to the Council Workforce
Strategy and Plan priorities in a service context.  The main themes arising from these
include:
 Building capacity and resilience
 Change management and a workforce culture to support and enable change
 Health and Well-being management (including absence management)
 Recruitment and retention
6.7 Best Value and Transformation
The service plans support the Council to continue its Best Value journey.
6.8 Property
None arising from this report.
Page 96

Page 97

6.9 Information Communications/Technology/Digital
None arising from this report.  However, where relevant work is set out within the
workforce plans to ensure that the workforce is ready and enabled for change,
including digital skills.
6.10 Equalities, Social Inclusion and Economic Impact
None arising from this report.
6.11 Climate Change and Biodiversity Impacts
None arising from this report.
7. CONSULTATION
7.1 This report has been prepared in consultation with the service managers in Financial
Services and any comments made have been incorporated into the report.
8. BACKGROUND PAPERS
8.1 Nil.
Page 97

Page 98

Master: SPMAN-851087866-214
APPENDIX 1
FINANCIAL SERVICES - SERVICE PLAN 2025-2028
1. Service Definition: FINANCIAL SERVICES: Financial Services provide support to services across the Council, to Grampian Valuation Joint Board
and in partnership with NHS colleagues, contribute towards the support of Moray Integration Joint Board. Main functions are
Accountancy, Accounts Payable and Accounts Receivable, Banking, Insurance, Procurement, Taxation (Council Tax and Non-
Domestic Rates), Treasury Management and VAT.
2. Service
Resources:
FTE 59.96
Budget £1,741,630
3. What have we identified for improvement in 2025-2028? What evidence did we use to identify this improvement?
Please add benchmark information wherever available and relevant to
the improvement.
Ensure financial sustainability by strengthening the financial
planning process:
- Strengthen capital monitoring
- Review the revenue forecasting process to ensure accurate
projections
Work with communities to further develop Participatory Budgeting
Identified as an area for improvement in the Best Value Audit Review 2024
Implement legislative / regulatory changes
- IFRS 16
A requirement with which the council has no choice but to comply and which will
involve significant work to ensure compliance
Note: Progress against BV Actions will be monitored and reported out with Service Plan process
Page 98

Page 99

Master: SPMAN-851087866-214
APPENDIX 1
FINANCIAL SERVICES - SERVICE PLAN 2025-2028
4. Strategic
Outcome or
Priority
Action Planned Outcome Outcome
measures
Completion
target
Lead Priority
Rating
(1 high. 3 low, 4 for
ongoing, 5 for on
hold)
(CP) Strategic
Framework:
Financial,
Workforce, Digital,
Transformation
Strategies. 
Performance
Management
Framework
Financial Planning:
Strengthen capital monitoring
Review forecasting procedures
for revenue budget
Financial plans show how the
local authority will align service
provision with funding to ensure
the sustainability of its services
in the future:
Automated monthly monitoring
reports
More accurate forecasts of
capital spend
More accurate estimated actual
Financial planning
improves in line with
recommendations from
the 2024/25 Annual
Audit Review:
Template for
budget/target input
Pilot complete (with
Consultancy) and report
to AMWG
Reports generated per
agreed timetable
Lower level of slippage
at year end
Estimated out-turn v
actual out-turn
June 2025
Sept 2025
March 2026
June 2026
June 2025
JF
JF
JF
LP
LP
1
BV 3.3
(CP) Strategic
Framework:
Financial,
Workforce, Digital,
Transformation
Strategies. 
Performance
Management
Framework
Further develop Participatory
Budgeting
Capture more information on
community led decision making.
Year on year increase
in amount allocated
until 1% of budget (as
defined by COSLA) is
allocated via PB
process.
July 2025
July 2026
July 2027
LP 1
BV 5.1
Page 99

Page 100

Master: SPMAN-851087866-214
APPENDIX 1
FINANCIAL SERVICES - SERVICE PLAN 2025-2028
5. Service Level
Outcomes or
Priorities
Action Planned Outcome Outcome Measures Completion
Target
Lead Priority
rating
Implement
legislative/regulatory
change
Implement requirements of IFRS 16
from 01 April 2024
Fully Compliant
Accounts
Audit opinion September 2025 JF 1
Implement the annual
Procurement
Action Plan (PSAP)
Implement the actions identified as
priorities in the Procurement Action
Plan:
- Review Procurement Policy
- Review requirement for IIA for each
contract
- Review GDPR requirements
- Implement actions for Community
Wealth Building Strategy
- C/f items from 2024/25
Strategic Action Plan
targets achieved
80% of PSAP indicators
achieving or exceeding target
March 2026 LP 2
Implement
recommendations
from
the Annual Audit
Report
Implement the actions agreed with the
auditors:
- Review GL journals and determine if
authorisation can be proportionately
introduced
- Review reconciliation of Property,
Plant, Equipment note to Fixed Asset
Register
- Review assets with nil Net Book
Value (NBV)
- Review classification of assets under
construction
Improved processes
Amend process if
considered
proportionate
Prepare reconciliation
Determine if any
amendments required
Reclassify any assets
which became
operational during
2024/25
Auditor agreement that
actions implemented in full
Record review and any
process amendments
Working paper
Audit trail for treatment of
assets with nil NBV
Amendments made
Assets correctly
disclosed
April 2025
September 2025
1st review –
June 2025
2nd review -
June 2026
Annual Review:
June 2025
June 2026
June 2027
LP 1
Page 100

Page 101

Master: SPMAN-851087866-214
APPENDIX 1
FINANCIAL SERVICES - SERVICE PLAN 2025-2028
Implement actions
from the Corporate
Asset Management
Plan
Implement the actions assigned to
Financial Services:
- Develop selection process for post
project reviews
- Agree timetable for Asset
Management Plan review
Improve the Asset
Management Planning
process
Actions complete by assigned
due dates (Still to be assigned
per timetable agreed with
services) June 2025
September 2025
LP 2
Increase Service
Efficiency – Taxation
Increase efficiency and availability of
digital processes for Taxation:
- Streamline Council Tax e-billing sign
up Process
- Non-Domestic Rates e-billing
Streamline Council Tax
e-billing sign up process
Non-Domestic Rates e-
billing - Introduce e-
billing for NDR payers 
Increased uptake of e-billing
Generate and maximise
uptake of NDR e-billing
March 2026
March 2026
JT 2
Increase Service
Efficiency –
Accounts
Increase efficiency and availability of
digital processes for Accounts;
- Investigate workflow for authorisation
database
Introduction of workflow
to facilitate management
of task
Database up to date Sept 2026 LP 2
Replace financial
management system
Contract comes to an end 2028 – re-
tender
Fully functional
integrated financial
management system
Market Research Complete
Tender Process Underway
Tender Process Complete
System Testing Underway
System operational
Sept 2025
Dec 2025
March 2027
April 2027
April 2028
LP 1
Health and Wellbeing Ensure revised operational
implementation of absence
management procedures are applied
by managers
Absence is managed
effectively, and levels of
absence are reduced
efficiently and timeously
Reduction in number of days
absence per employee
March 2026 LP and
Service
Managers
2
Page 101

Page 102

Page 102

Page 103

Report
to:
Meeting Date:Corporate Committee 10 June 2025
Report
by:
Report No:Depute Chief Executive
(Education,
Communities and
Organisational
Development)
GSP030/25/AM/NS
Author: Neil Stables Contact Email: performance@moray.gov.uk
Subject: Performance Report (Governance, Strategy and Performance) – Period
to March 2025
1. PURPOSE
☒ For Decision      ☐  For Information
1.1 The purpose of this report is to scrutinise performance in areas of Service Planning,
Service Performance and other related data to the end of March 2025 and note actions
being taken to improve performance where required.
1.2 This report is submitted to the Committee in terms of section III (A) (4) of the Council’s
Scheme of Administration to monitor performance in accordance with the Council’s
Performance Management Framework.
2. SUMMARY
2.1 The report identifies the progress of Service Plan Actions and Performance Indicators
highlighting areas of good progress and areas where there have been challenges.
Mitigations and actions taken to address challenges are detailed within the body of the
report.
At the end of March 2025, overall progress against the 2024/25 Service Plan was 69%
complete.  Progress against Service Plan Priorities and Indicators and operational
Service Performance Indicators is presented in the table and charts below –
Item 11.
Page 103

Page 104

RAG
Strategy and Performance 85%
Internal Audit 100%
Digital Transformation and Efficiency 50%
Improved Governance 75%
Performance Management 60%
69%
SERVICE PLAN PRIORITIES
OVERALL PLAN PROGRESS
SERVICE
Service Plan: Overall progress at the end of March is 69%.  All actions
have progressed, with five actions complete.  Actions around Self-
Assessment, LOIP, Customer Services and Benefits have slipped
planned target dates due to competing priorities and staffing pressures.
The majority of these actions have been reviewed and are being carried
forward to 2025/26 with revised completion dates. 
Performance Indicators: No strategic indicators
Comment
STRATEGIC
SERVICE PI'S
Achieving
Target
Within Target
Below Target
Data Only
0
3. RECOMMENDATIONS
3.1 It is recommended that Committee scrutinises and notes performance in areas of
Service Planning, Service Performance and other related data to the end of
March 2025 and note actions being taken to improve performance where
required.
Neil Stables
Research and Information Officer
4. BACKGROUND AND CONTEXT
4.1 Each service plan sets out the planned strategic and service level priorities and
outcomes it intends to deliver in the coming year aligning closely with financial
planning, corporate and community planning partnership strategic priorities.  
4.2 Progress on Service Plan priorities and outcomes and key areas of operational
performance is reported by exception, highlighting successes and giving assurances
around the challenges and actions to support.  Links to Service Plan Actions and
Performance Indicators can be accessed within the background papers section of this
report.
4.3 Complaints are reported in terms of time taken to respond, outcomes and learning
points.  Links to Complaints tables can be accessed within the background papers
section of this report.
4.4 Latest Local Government Benchmarking Framework (LGBF) results for 2023/24 are
published throughout the year with final results publication and data refresh in June. 
The full suite can be viewed via the LGBF Dashboard.  Published indicators for this
service have been incorporated with the relevant section of this report depending on
Page 104

Page 105

whether used to evidence progress against strategic, service level or service
performance priorities.  LGBF indicator targets and Red/Amber/Green (RAG) status in
the backing tables is now based on ranking thresholds aligning with exception
reporting.
4.5 The Sustainable Development Statement was approved by the Corporate Committee
on 5 November 2024 (para 16 of the Minute refers).  The Statement draws out the way
in which sustainable development is embedded in the Corporate Plan 2024-29 and
wider corporate policies, strategies and plans with progress being reported through
several updates and reports, one of which is Quarter 4 performance reporting.  Service
Plan actions and indicators that underpin the delivery of Sustainable Development
Goals are highlighted in backing table documents and comment where relevant is
incorporated in this report.  An overview of progress will be presented in the Corporate
Plan progress update in due course.
5. PROPOSALS
Successes – Service Plan Strategic and Service Level Outcomes and operational
Service Performance
5.1 A Corporate reporting regime has been established with timely reporting of
performance across Best Value, Corporate Plan, Local Government Benchmarking
Framework (LGBF) and Service Plans. (Action: GSP 2024-25 STRA 1.2)
5.2 Good progress has been made on the project to move the Out of Hours phone service
from the Housing Team to an outsourced arrangement through the contact centre. 
Barring any delays due to the requirement to migrate digital telephony systems, it is 
expected that this project will complete on time in the first quarter of 2025/26. (Action:
GSP 2024-25 DT&E 1.3)
5.3 The Burial Administration post has now formally been transferred to the Lands and
Parks Service after a transition year where the post was line managed by the Senior
Registrar.  All future burial grounds administration duties will now be line managed
through the Lands and Parks Service.  (Action: GSP 2024-25 DT&E 1.6)
Challenges and actions to support – Service Plan Strategic & Service Level
Outcomes and operational Service Performance
5.4 Reestablishing a format and timetable for Public Sector Improvement Framework
(PSIF) self-assessments has slipped due to competing demands within the Strategy
and Performance Team. However, the first PSIF session is scheduled for May with
Improvement Services supporting the process.  An area on Interchange is still to be
identified for publishing PSIF material, while resourcing around PSIF scheduling to be
reviewed.  The revised completion date for this is July 2025.  (Action: GSP 2024-25
STRA 1.1)
5.5 Investigation of a ‘one plan’ position for Moray to potentially act as a Corporate Plan
and LOIP will progress out with original timescale.  Update reports have been
submitted to the Community Planning Officers Group and Community Planning Board. 
Partners continue to work collaboratively with feedback session on recent Community
Planning self-evaluation result facilitated by the Improvement Session scheduled for
May. (Action:GSP 2024-25 STRA 1.3)
5.6 Completion of business continuity plans for critical services had been scheduled for
completion by March 2025, however competing demands within services has led to this
Page 105

Page 106

deadline slipping.  A brief has been presented to the Corporate Management Team
detailing progress and constraints, the latter mainly related to service capacity and
relative priorities.  Going forward, this will be programmed as a cyclical process rather
than viewing it as a single point in time, with progress continuing to be monitored
through the service plan.  (Action: GSP 2024-25 IG 1.2)
5.7 Draft Delivery Frameworks for three of the four Local Outcome Improvement Plan
priorities have been submitted, completion date revised for December 2025. (Action:
GSP 2024-25 PM 1.1)
5.8 Introduction of a new Customer Relationship Management (CRM) system is
progressing out with due dates with the development of defined statement of
requirements to support the business case.  The new Customer Services Manager is
investigating options against system expectations and resource availability. (Actions:
GSP 2024-25 DT&E 1.1 and 1.2)
5.9 Competing year end work took priority over the development of benefits e-form, which
is nearing completion out with original due date with final stages of internal testing
being carried out prior to roll-out. (Action: GSP2024-25 DT&E 1.4)
5.10 Over the course of 2024/25, just under 136,000 calls were received by the Customer
Services Call Centre at an average of around 11,300 calls per month.  The continuing
high volume of calls in combination with some telephony issues and reduced staffing
resources through budget savings and absences have impacted the service with 81.9%
of calls answered in 2024/25, slightly down on the 84.8% last year.  The graph below
shows the quarterly call volume and answer rates over the last three years.  The sharp
decrease in answer rates for Quarter 4 was due to a significant telephony issue on the
31 March, which resulted in only 26% of calls being answered on that day, which
affected the performance for the quarter.
Of the calls answered during 2024/25, 58.3% were answered within the 60 seconds
target, a reduction on the 61.8% achieved in the previous year.  Improvements in
performance were made in Quarter 2 and 3 at 63.9% and 65.6% respectively, however
staffing issues in Quarter 1 and telephony issues in Quarter 4 impacted on the overall
Page 106

Page 107

performance for the reporting year.  The graph below shows the quarterly performance
over the last three years. (PIs: CPS058 and CPS058a)
5.11 The development of a business case to determine whether there would be wider
efficiencies in moving means testing from the social care service into the Benefits team
has not progressed as planned this reporting year. While there has been some scoping
work carried out around centralising and stream-lining financial assessment for social
care costs and blue badges, continued staffing pressures and service scrutiny have
restricted further progress.  The development of the business case will be carried
forward as an action into the 2025/26 service plan.  (Action: GSP 2024-25 DT&E 1.5)
5.12 The average time (days) to process new housing benefits claims have remained above
the target of 21 days, with the cumulative average for 2024/25 being 23.4 days.  While
processing rates have improved during Quarter 4, staffing issues over the Quarters 2
and 3 have impacted the overall performance for the year.  Staffing issues have eased
and it is anticipated performance will improve during 2025/26.  (PI: CPS011)
Complaints and MP/MSP Enquiries
5.13 A total of seven complaints were received during the second half of 2024/25, while
eight complaints were closed. All complaints were resolved at Frontline stage. Six
complaints were partially or fully upheld, with the remaining two not upheld.  Six of the
eight  complaints were resolved within the 5 working day target timescale, with the
overall average time taken to respond to complaints being 5 days.  Of the six
complaints upheld: three related to delays in processing licence applications through
Legal Services; two for delays in Customer Services resolving enquiries; and one
around the lack of cost information for internments.  All complaints were acknowledged
with an apology and reinforcement action duly taken.
5.14 Across the council, over the last three years the Council have dealt with around 1,400
non-statutory MP/MSP enquiries, in addition to over 1,500 statutory complaints
received over a similar period, that are subject to the Model Complaints Handling
Procedure (MCHP).  The following graph shows the volume of MP/MSP enquiries
received each quarter since Quarter 1 2022/23.
Page 107

Page 108

On average each quarter the Council receive 116 enquiries.  The volume of enquiries
had steadily decreased since Quarter 2 2023/24, however over the last six months
there has been an increase, with 111 enquries received in Quarter 4 2024/25.  Almost
75% of enquiries were directed to Economy, Environment and Finance in 2024/25.  All
enquiries follow a similar process to that of complaints in being formally logged and
responded to.
Case Studies
5.15 Nothing to report
Consultation and Engagement
5.16 Nothing to report
6. SUMMARY OF IMPLICATIONS
6.1 The table below shows whether risks and implications apply if the recommendations are
agreed:
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement
Plan)
X
Policy and Legal X
Financial X
Risk X
Staffing X
Best Value and Transformation X
Property X
Information Communications Technology/Digital X
Equalities. Social Inclusion and Economic Impact X
Climate Change and Biodiversity Impact X
6.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Page 108

Page 109

Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans.
a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following
Council Plan strategic priorities:
☒ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population
6.3 Policy and Legal
The Council has a statutory requirement to publish a range of information that will
demonstrate that it is securing best value and assist in comparing performance both
over time and between authorities where appropriate.
6.4 Financial
There are none arising from this report.
6.5 Risk
There are none arising from this report.
6.6 Staffing
There are none arising from this report.
6.7 Best Value and Transformation
How councils plan for, manage and report on performance is a key area of focus in
external audit work, particularly on best value.
6.8 Property
None arising from this report.
6.9 Information Communications/Technology/Digital
None arising from this report.
6.10 Equalities, Social Inclusion and Economic Impact
An Equality Impact Assessment is not required as this report is to inform the Committee
on performance.
6.11 Climate Change and Biodiversity Impacts
None arising from this report.
7. CONSULTATION
7.1 This report has been prepared in consultation with The Head of Education Resources
& Communities, Deputy Chief Executive (Education, Communities & Organisational
Page 109

Page 110

Development), Service Managers, and Caroline O’Connor, Committee Services Officer
and any comments made have been incorporated into the report
8. BACKGROUND PAPERS
8.1 Service Plan Actions
Performance Indicators
Service Complaints
Page 110

Page 111

Report
to:
Meeting
Date:
Corporate Committee 10 June 2025
Report
by:
Report No:Depute Chief
Executive
(Education,
Communities and
Organisational
Development)
HR007/25/SW
Author: Suzanne Wilson Contact
Email:
performance@moray.gov.uk
Subject: Performance Report (Human Resources, Information Technology
and Organisational Development) – Period to March 2025
1. PURPOSE
☒ For Decision      ☐  For Information
1.1 The purpose of this report is to scrutinise performance in areas of Service
Planning, Service Performance and other related data to the end of March
2025 and note actions being taken to improve performance where required.
1.2 This report is submitted to Committee in terms of Section III (A) (4) of the
Council’s Scheme of Administration to monitor performance in accordance
with the Council’s Performance Management Framework.
2. SUMMARY
2.1 At the end of March 2025, overall progress against the 2024-25 Service Plan
was 59% complete, although this does include several longer-term actions
with due dates into 2026 and 2027.  Progress against each Service Plan
Priority and the Service Plan and operational Service Performance Indicators
are presented in the table and charts below.  It is proposed that all priorities
and actions will continue within the 2025-2028 Service Plans. 
Item 12.
Page 111

Page 112

3. RECOMMENDATIONS
3.1 It is recommended that Committee scrutinises and notes performance
in areas of Service Planning, Service Performance and other related
data to the end of March 2025 and notes actions being taken to
improve performance where required.
Author Name Suzanne Wilson
Job Title Research & Information Officer
4. BACKGROUND AND CONTEXT
4.1 Each service plan sets out the planned strategic and service level priorities
and outcomes it intends to deliver in the coming year aligning closely with
financial planning, corporate and community planning partnership strategic
priorities.  
4.2 Progress on Service Plan priorities and outcomes and key areas of
operational performance is reported by exception, highlighting successes
and giving assurances around the challenges and actions to support.  Links
to Service Plan Actions and Performance Indicators can be accessed within
the background papers section of this report.
4.3 Complaints are reported in terms of time taken to respond, outcomes and
learning points.  Links to Complaints tables can be accessed within the
background papers section of this report.
Page 112

Page 113

4.4 Latest Local Government Benchmarking Framework (LGBF) results for
2023/24 are published throughout the year with final results publication and
data refresh in June.  The full suite can be viewed via the LGBF Dashboard.
Published indicators for this service have been incorporated with the
relevant section of this report depending on whether used to evidence
progress against strategic, service level or service performance priorities. 
LGBF indicator targets and RAG status in the backing tables are now based
on ranking thresholds aligning with exception reporting.
4.5 The Sustainable Development Statement was approved by the Corporate
Committee on 5 November 2024 (para 16 of the Minute refers).  The
Statement draws out the way in which sustainable development is
embedded in the Corporate Plan 2024-29 and wider corporate policies,
strategies and plans with progress being reported through several updates
and reports, one of which is quarter 4 performance reporting.  Service Plan
actions and indicators that underpin the delivery of Sustainable
Development Goals are highlighted in backing table documents and
comment where relevant is incorporated in this report.  An overview of
progress will be presented in the Corporate Plan progress update in due
course.
5. PROPOSALS
Successes – Service Plan Strategic & Service Level Outcomes and
operational Service Performance
5.1 As agreed at the meeting of this committee on 28 January 2025 (para 10 of
the minute refers), a phased approach for Leadership Development has
been adopted allowing for the ongoing management review and input from
the new Chief Executive.  An action to develop this programme further is
included within the 2025-2028 Service Plan. (Strategic Action HROD24-25
Strat 4.1)
5.2 Planned work linked to change management is complete.  Workforce
implications arising from Budget savings have continued to be managed
through Transform while Organisational Development (OD) have liaised with
management and Trade Unions to improve the Employee Survey.  Results
from the latest survey are currently being analysed and will be used to
develop future change preparation initiatives.  (Service Level Action
HROD24-25 5.1 and 5.2)
5.3 Following the review and publication of the Employee Survey (as noted in
para 5.2) all workforce related actions contained within the Best Value Plan
have been achieved.  (Service Level Action HROD24-25 5.5)
5.4 ICT support for the Smarter Working Project during 2024-25 is complete.  In
addition to all planned office changes, advice and guidance were provided
to assist relocation of Health & Social Care staff and Grampian Assessors. 
The team continues to have representation on both the Project Board and
Delivery Group with plans underway for Phase 3 of the project.  This will be
Page 113

Page 114

monitored as an action within the 2025-2028 Service Plan.  (Service Level
Action ICT24-25 5.1)
Challenges and actions to support – Service Plan Strategic & Service
Level Outcomes and operational Service Performance
5.5 During the reporting period, resourcing issues and staff absence affected
delivery of some activities around recruitment and retention and fair and
competitive pay and conditions.  Progress has been made with improving
exit monitoring and reviewing employment literature, with a revised
approach to succession planning expected shortly.  Assessment of current
practice against the Ethnic Minority Recruitment Toolkit Work is also
complete.  Both actions will continue as part of the 2025-2028 HR and OD
Service Plan.  (Strategic Action HROD24-25 Strat 4.2 and 4.3)
5.6 Latest LGBF data shows the Gender Pay Gap within Moray Council has
improved slightly to 4.6% for the year to March 2024, however this remains
well below both Scottish and family group averages with Moray ranked 29th
nationally.  The Council supports a range of flexible working options to
ensure the workplace is accessible for all and will continue to monitor the
impact of pay awards, so they remain free from bias.  (Strategic Level PI
Corp 3c)
5.7 Planned work to support employees and address absence is 90% complete.
LGBF data for 2023/24 reports sickness absence per teacher increased to
9.6 days, placing Moray 29th out of 32 authorities.  A key objective this year
was to improve support for school-based staff.  For this, a ‘Spend to Save’
mandate providing a targeted approach to absence within Education has
been devised while a review of the Challenging Behaviour policy by the joint
working group is underway.  This will continue as a priority within the 2025-
2028 HR and OD Service Plan.  (Service Level Action HROD24-25 Serv
5.4, Service Level PI CORP6a)
5.8 Although out with target timescales, Cyber Resilience work has progressed.
PSN accreditation was successfully achieved in March while a follow up
phishing simulation resulted in significant improvements against baseline
data.  Malicious Software training, launched in February, has so far received
a relatively low uptake at 43%, against a target of 80%.  Initial national
benchmarking work shows an average 62% uptake for similar modules. 
Further work will be undertaken to increase uptake with measures to
manage and improve cyber security incorporated into the proposed 2025-
2028 ICT Service Plan.  (Service Level Action ICT24-25 Serv 5.3, Service
Level PI ICT003) 
5.9 Forward planning work, supporting large-scale system replacements for
Lagan and Carefirst, is reported at 10% complete within its due date of
March 2025.  The business case and option review is ongoing for Lagan
while for Carefirst, timescales have been revised with a replacement now
expected by March 2027.  A project team meets regularly with procurement
while data cleansing of the current system is underway.  A process mapping
Page 114

Page 115

exercise is planned for April 2025.  This work will be monitored as part of
the 2025-2028 ICT Service Plan.  (Service Level Action ICT 25-25 Serv 5.4)
5.10 The section wide Public Service Improvement Framework (PSIF) self-
evaluation exercise, originally planned for quarter 3, will now take place in
May.  An action covering this work is included within both 2025-2028
Service Plans.  (Service Level Action HROD24-25 Serv 5.6 and ICT24-25
Serv 5.6)
5.11 Absence management is undertaken in line with all corporate procedures
with support from HR where appropriate however further work is required in
relation to absence data analysis for ICT.  This will continue as part of the
2025-2028 ICT Service Plan. (Service Level Action ICT24-25 Serv 5.7)
5.12 Annual Violence and Aggression Incidents fell slightly from 3,775 in 2023-24
to 3,766 in 2024-25; however, incidents reported by Education notably
increased between quarters 3 and 4, rising by 38% to 1,066 (see table
below).  892 were recorded within a Primary School setting, 151 in
Secondary and 23 within a Nursery.  A total of 295 pupils were involved with
the majority (200) primary school age.  The Central Team are working
closely with the schools involved to provide SEBN/ASN training, additional
funding for staff and support around potential interventions.  (Service
Performance PI HROD006)
Q4 2023
-24
Q1 2024
-25
Q2 2024
-25
Q3 2024
-25
Q4 2024
-25
Education 890 732 701 772 1,066
Supported
Accommodation
103 155 89 115 120
Corporate 2 3 1 7 5
Total 995 890 791 894 1,191
5.13 Working days lost due to industrial injury or accident increased during
quarter 4 to 80, taking the annual total to 201.  Three separate injuries have
attributed to this increase.   (Service Performance PI HROD007)
Complaints and MP/MSP Enquiries
5.14 During the second half of 2024/25, one complaint has been received.  This
complaint remains open with investigations ongoing.
5.15 Human Resources, ICT and Organisational Development have received no
MP/MSP enquiries during the reporting period.
Other Performance (not included in the Service Plan)
5.16
5.17
In the last 12 months, the Information Systems Teams have made notable
progress in areas not covered by the remainder of this report.
Approach to Data
Page 115

Page 116

5.18
5.19
5.20
5.21
A data strategy has been drafted detailing an approach to how we can make
better use of our data within Moray Council.  It addresses areas such as
how we understand and improve our data, data governance, data
accessibility, and data analytics.  We are also engaged with the Scottish
Government regarding the use of their data maturity assessment
framework, a methodology that has been successfully applied to 15 other
Scottish councils.  It is proposed that using this approach to refine our
strategy will provide a route to becoming a more agile, data-driven
organisation.
New Technology
ICT have pushed forward cutting-edge technology such as Copilot for
Microsoft 365.  This is an advanced AI-powered tool integrated into
Microsoft 365 applications such as Outlook, Teams, Word, and other office
apps.  It leverages Large Language Model (LLM) and corporate data to
assist users in various tasks, enhancing productivity and efficiency.
ICT have been leading a pilot with 75 users across the organisation and run
several introductory sessions to get the pilot users started, as well as
building a Teams community around the use of such technology within
Moray Council.
Innovative Solutions
ICT have delivered innovative solutions to solve issues services are having
with certain areas, plugging gaps where third-party bought solutions are
lacking in functionality.  One example is with our Housing system, where
SMS messages are sent to tenants but there was no way of telling if the
messages were delivered or not.  ICT created a bespoke solution to
generate a report, letting the service know if their communications are being
received.
Another solution ICT created was a Private Water Inspection reminder
system, notifying users when they have an upcoming inspection booked. 
This has helped reduce missed appointments for the service.
The AP (Accounts Payable) Data Entry system implemented by ICT last
year has processed approximately 24,000 invoices and had a significant
impact on the service's efficiency and improved governance around the
process.
New Approach to Digital Strategy
Currently, ICT is working with senior management to refresh our digital
strategy and approach to digital transformation. This approach will revolve
around understanding the market and what other authorities are doing,
modernising our legacy system estate, upskilling our digital workforce, and
making better use of our data.
Learning Management System Update
LMS – the implementation of the updated Learning Management System
(LMS) was completed on 12 May 2025. This update enhances current
provision, improves reporting, streamlines training processes and provides a
Page 116

Page 117

5.22
5.23
5.24
more engaging learning experience for all users. The OD team has worked
with ICT to ensure integration with the HR/Payroll System (iTrent), a smooth
transition and consistent data flow across platforms ensuring that
employees details are accurate and the council structure is maintained. This
has involved working with Education colleagues to understand their
requirements and how the organisation wide LMS can be used for their
service specific needs. Also with colleagues in Social Work Training
regarding the use of e-portfolios to support streamlining and efficiencies in
that service. Work will now progress on further proposed developments
including scoping the use of the system for those who are not part of the
Council’s workforce, namely, volunteers and personal assistants.
First Aid Training Provision
Following a procurement exercise, two contracts have been awarded to
organisations to provide first aid training. The first is to provide the
necessary and required First Aid at Work and Emergency First Aid at Work
training across the organisation with the second providing Paediatric First
Aid training to those in the Early Years Service.
Zero Tolerance Approach
A number of strands of work are being brought together on a planned
organisation wide basis and work has been taken forward on linking a
number of these including the Employee Protection Marker System, the
operational implementation of which is being discussed across a number of
services.
Readiness for legislative/policy changes
The OD team has undertaken considerable work on ensuring that the
Council is ready and prepared for legislative/policy changes including, for
example, contributing to what is required for the implementation of the
Disclosure Scotland Act 2020 as well as developing a plan for taking the
required work on the ongoing employment policy framework forward.
Case Studies
5.25 Nothing to report.
Consultation and Engagement
5.26 The latest Employee Survey was launched on 10 March 2025.  Running
over a period of four weeks, this survey provides staff with the opportunity to
anonymously share their views on working for the council, helping to shape
future decision making.  Analysis of responses is now underway with an
improvement plan based on common themes to follow.
6. SUMMARY OF IMPLICATIONS
6.1 The table below shows whether risks and implications apply if the
recommendations are agreed:
SUBJECT YES NO
Page 117

Page 118

Corporate Plan and 10 Year Plan (Local Outcome Improvement
Plan)
X
Policy and Legal X
Financial X
Risk X
Staffing X
Best Value and Transformation X
Property X
Information Communications Technology/Digital          X
Equalities. Social Inclusion and Economic Impact X
Climate Change and Biodiversity Impact X
6.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP))
Improved Collaborative Leadership, as part of continuous improvement
through Best Value, will better enable the Council to fulfil the ambitions set
out in its strategic plans.
a) Links to Council Corporate Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the
following Council Plan strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.
b) Links to Local Outcomes Improvement Plan – The proposals in this
report support and contribute to improved outcomes for communities
as outlined in the following local Outcomes Improvement Plan
priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in  
Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population
6.3 Policy and Legal
The Council has a statutory requirement to publish a range of information
that will demonstrate that it is securing best value and assist in comparing
performance both over time and between authorities where appropriate.
6.4 Financial
None arising from this report.
6.5 Risk
None arising from this report.
6.6 Staffing
None arising from this report.
Page 118

Page 119

6.7 Best Value and Transformation
How councils plan for, manage and report on performance is a key area of
focus in external audit work, particularly on best value.
6.8 Property
None arising from this report.
6.9 Information Communications/Technology/Digital
None arising from this report.
6.10 Equalities, Social Inclusion and Economic Impact
None arising from this report.
6.11 Climate Change and Biodiversity Impacts
None arising from this report.
7. CONSULTATION
7.1 This report has been prepared in consultation with the Head of Human
Resources, Information Technology and OD and relevant Service Managers
and any comments made have been incorporated into the report.
8. BACKGROUND PAPERS
8.1 Service Plan Actions
Service Plan Performance Indicators
Service Performance Indicators
Service Complaints
Page 119

Page 120

Page 120

Page 121

Report to: Meeting
Date:
Corporate Committee 10 June 2025
Report by: Report No:Depute Chief Executive
(Education,
Communities and
Organisational
Development)
GSP019/25/DW/LM
Author: Denise Whitworth /
Frances Garrow/
Alasdair McEachan
Contact
Email:
Denise.whitworth@moray.gov.uk
Subject: Human Resources, ICT and Organisational Development and
Governance, Strategy and Performance Service Plans 2025-28
1. PURPOSE
☒ For Decision      ☐  For Information
1.1 To invite the Committee to consider the Human Resources, ICT and Organisational
Development and Governance, Strategy and Performance Service Plans for 2025-28.
1.2 This report is submitted to Committee in terms of Section III (A) (4) of the Council’s
Scheme of Administration relating to monitoring performance of the services within the
Committee’s remit in accordance with the Council’s Performance Management
Framework.
2. SUMMARY
2.1 Service Plans have been prepared identifying the improvements targets for 2025-28. 
In preparing the plans, managers have taken account of risk, performance data, the
LOIP, the Corporate Plan and other relevant factors such as audit and inspections
outcomes.  The Service Plans also identify the resources allocated to each service.
3. RECOMMENDATIONS
3.1 It is recommended that Committee consider and approve:
i) the Service Plan for Human Resources, ICT and Organisational
Development for the year ahead in Appendix 1 and 2; and
ii) the Service Plan for Governance, Strategy and Performance for the year
ahead in Appendix 3.
Item 13.
Page 121

Page 122

Denise Whitworth
Depute Chief Executive (Education Communities and Organisational
Development)
4. BACKGROUND AND CONTEXT
4.1 Service planning is a key aspect of the Council’s Performance Management
Framework and is undertaken annually to set out the strategic direction for services
over the coming months.
4.2 It should be noted that actions from the Best Value Action Plan, agreed by the
Corporate Committee on 23 April 2024 (para 6 of the minute refers) will be monitored
and reported out with the Service Plan process.
4.3 The service planning process focuses on forward planning for medium-term activities
supporting delivery of the Local Outcomes Improvement Plan (LOIP) and Corporate
Plan.  The Council’s planning process also includes team plans that focus on short
term tactical and operational activities supporting delivery of the Service Plan and
strategies and Employee Review and Development Plans (ERDP) and Professional
Review and Development (PRD) plans provide individual planning for employees’
activities and development.
4.4 As well as identifying service developments and improvements, the Service Plan
Framework requires an assessment of the output and outcome requirements for
services based on the Council’s priorities, statutory and regulatory requirements and
other relevant local and national direction and makes use of improvement tools for
planning and continuous improvement.  Services are planning to support their
improvement work with the Public Sector Improvement Framework (PSIF), which the
Council is in the process of re-invigorating for relevant services.  Across services,
priority outcomes are those included in the Council’s Corporate Plan 2024-29 that
directly relate to the service or are influenced by the service and should be clearly
identified.
4.5 Setting clear measurable outcomes and defining key indicators by which progress will
be assessed continues to be an area for development within the Council.  However, it
is recognised that for some actions it can be difficult to identify a measurable outcome
(e.g. a change in legislation that must be implemented or updating a policy framework).
Therefore, as far as possible efforts have been made to set measurable outcomes for
service plan actions but in some cases outputs and key progress milestones have been
used so that it is still possible to measure whether the action has been progressed as
intended.
4.6 A summary of progress is given below for each of the services based on the
performance monitoring carried out throughout the year by the services and reported to
committee as part of performance reporting.  Further information on performance at the
end of Quarter 4 is included in the service Performance Reports that are also on the
agenda of this Committee.  The Performance reports note where there is a carry
forward of actions from the previous Service Plans into the 2025/8 Plans.
4.7 It should be noted that while there will be some re-organisation of teams and alignment
of services as a result of the management restructure, service plans have been
prepared taking account of Council priorities, national priorities and ongoing and
emerging service priorities.  Therefore, it remains appropriate to seek approval for the
annual refresh of Service Plans to ensure that they continue to reflect the next iteration
Page 122

Page 123

of priorities and direction from committee and that services are appropriately directed
and tasked.
5. PROPOSALS
5.1 The focus of the Plan is for 2025-26 although the service has set high level priorities for
a three-year period 2025-28 with actions being reviewed annually. 
Human Resources, ICT and Organisation Development
5.2 Progress on planned work (success)
 The leadership development programme has been revised with a phased approach
agreed.
 Communication and Engagement activity has been refreshed with revised Team
Talks issued and improvements to internal communications proposed.
 A pilot scheme to improve monitoring of staff absence within schools has been
developed with monthly absence reviews and a training module also now in place.
 Support has continued for the Smarter Working project with ICT representation on
both the Project Board and Delivery Group.
5.3 Progress on planned work (areas for development / not delivered)
 Resourcing issues and staff absence affected progress relating to recruitment and
retention and pay and conditions.
 Self-evaluation has followed the corporate schedule with PSIF sessions now
planned for HR, ICT and OD. 
 E-learning on malicious software was issued later than planned while further self-
assessment activity awaits publication of the Scottish Government’s Public Sector
Cyber Resilience Framework. 
 Progress with the Lagan replacement/upgrade has been limited however with the
new Customer Service Manager in post, options are now being reviewed.
5.4 Planned focus in new plan (reflecting above and challenges to come)
 Continued development of the leadership programme.
 Development of a flexible recruitment approach, including succession planning, that
addresses service needs.
 Workforce planning actions in place, taking account of latest workforce analysis and
Employee Survey results.
 Develop modern, sustainable working conditions where employees are prepared for
change.
 Communication that supports corporate and service priorities and improves
engagement.
 Continue to expand the digital approach including use of AI, enhanced value of data
and development of the Education ICT strategy.
 Improve service delivery through utilisation of service specific systems and
platforms.
 Manage cyber security and resilience risks.
 Improved forward planning for upcoming system replacements.
5.5 The service plan for Human Resources and Organisational Development is attached in
Appendix 1 with the ICT service plan in Appendix 2. 
Governance, Strategy and Performance
Page 123

Page 124

5.6 Progress on planned work (success)
 Corporate reporting regime established with timely reporting of performance across
Best Value, Corporate Plan, Local Government Benchmarking Framework and
Services.
 Governance documents updated and committee roles clarified in line with the Best
Value Action Plan.
 Burial administration post transferred to the Lands and Parks Service.
 Good progress has been made on the project to move the Out of Hours phone
service from the Housing Team to an outsourced arrangement through the contact
centre.  It is expected that this project will complete on time in the first quarter of
2025.
 After considerable development work the e form for Welfare Benefits is currently
being trialled.  It is expected that this project will complete on time in the first quarter
of 2025.
 A format for the Citizens advice service level agreement has been approved by
Committee.
5.7 Progress on planned work (areas for development / not delivered)
 The merits of a “One Plan” strategic document continue to be investigated with
community partners.
 Introduction of a new Customer Relationship Management (CRM) system has been
delayed however the new Customer Services Manager is investigating options
against system expectations and resource availability.
 Review of out of hours phone service progressing with stakeholder engagement
complete, slippage expected due to some system migration issues.
 Draft Delivery Frameworks for three of the four priorities have been submitted,
completion date revised for December 2025.
 Completion of business continuity plans for critical services had been scheduled for
completion by March 2025 however competing demands within services has led to
this deadline slipping. Going forward, this is being treated as a cyclical process
rather than viewing it as a single point in time.
 Re-establishing a format and timetable for Public Sector Improvement Framework
(PSIF) self-assessments has slipped due to competing demands within the Strategy
and Performance Team. The fist PSIF session is scheduled in May with support
from Improvement Services.
 It was hoped to have a business case to determine whether there would be wider
efficiencies in moving means testing from the social care service into the benefits
team. This work has not progressed due to staffing pressures but is carried forward
into this year’s Service Plan.
5.8 Planned focus in new plan (reflecting above and challenges to come)
 The biggest project for the new plan is the replacement of the Council’s customer
relationship management (CRM) software.  This will involve re mapping and seeking
further efficiencies in all of the Council’s frontline customer contact.
 Re-establishing the Public Sector Improvement Framework for services within the
Council has been prioritised as it underpins the Best Value action plan.  The
Improvement Service are assisting in the process.
5.9 The service plan for Governance, Strategy and Governance is attached in Appendix 3.
6. SUMMARY OF IMPLICATIONS
Page 124

Page 125

6.1 The table below shows whether risks and implications apply if the recommendations
are agreed:
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement
Plan)

Policy and Legal 
Financial 
Risk 
Staffing 
Best Value and Transformation 
Property 
Information Communications Technology/Digital          
Equalities. Social Inclusion and Economic Impact 
Climate Change and Biodiversity Impact 
6.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans.
a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following
Council Plan strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population
6.3 Policy and Legal
None arising from this report.
6.4 Financial
None arising from this report.
6.5 Risk
There are potential risks around progress in all priority areas due to staffing pressures
and which often has an impact on officers.
6.6 Staffing
There are no staffing issues.  The service plan actions will be accommodated within
existing resources.
The services have undertaken workforce planning to consider how best to prepare and
manage the workforce for the services to be able to respond to the agreed Council
priorities in the Corporate Plan and the service work that is required to support and
achieve those objectives.  Consideration has also been given to the Council Workforce
Page 125

Page 126

Strategy and Plan priorities in a service context.  The main themes arising from these
include:
 Building capacity and resilience
 Change management and a workforce culture to support and enable change.
 Health and Well-being management (including absence management).
 Recruitment and retention.
6.7 Best Value and Transformation
The service plans support the council to continue its Best Value journey.
6.8 Property
None arising from this report.
6.9 Information Communications/Technology/Digital
None arising from this report.  However, where relevant work is set out within the
workforce plans to ensure that the workforce is ready and enabled for change,
including digital skills.
6.10 Equalities, Social Inclusion and Economic Impact
None arising from this report.
6.11 Climate Change and Biodiversity Impacts
None arising from this report.
7. CONSULTATION
7.1 This report has been prepared in consultation with the service managers in Human
Resources, Organisational Development and ICT and Governance, Strategy and
Performance and any comments made have been incorporated into the report.
8. BACKGROUND PAPERS
8.1 Nil.
Page 126

Page 127

APPENDIX 1
HR and OD - SERVICE PLAN 2025-2028
1. Service
Definition:
HR and OD provide professional advice to ensure compliance with relevant legislation, best practice and industry
standards to support the council in delivering it corporate priorities.  The main functions of the Service include HR
professional advisory service, corporate employment administration function, payroll, corporate communications,
corporate health and safety and organisational development.
2. Service
Resources:
Service Resources: 36.52 FTE
Budget: Capital £000
Budget: Revenue £000: £2.5M
3. What have we identified for improvement in 2025-
28?
What evidence did we use to identify this improvement?
Please add benchmark information wherever available and
relevant to the improvement.
Leadership Capacity and Development
Workforce Planning and Change
Organisational Development
Recruitment and Retention
Health and Well-being
Workforce and OD Strategy 2024-27
BV Consolidated Action Plan 2024
Corporate Plan 2024-2029
Employee Survey 2023
Management of workforce implications linked to budget savings
HR metrics
Feedback from Trades Union Representatives and Managers
Health & Safety Annual Report 2024
Gender Pay Gap Corporate Plan 2024-2029
Local Government Benchmarking Framework 2023-24
Note: Progress against BV Actions will be monitored and reported out with Service Plan process
Page 127

Page 128

APPENDIX 1
HR and OD - SERVICE PLAN 2025-2028
4. Strategic
Outcome
or Priority
Action Planned Outcome Outcome measures Completion
target
Lead Priority
Rating
(1 high, 3 low,
4 for ongoing,
5 for on hold)
(CP) Strategic
Framework:
Financial,
Workforce,
Digital,
Transformation
Strategies. 
Performance
Management
Framework
Establish leadership
development
programme to address
corporate and
individual leadership
needs aligned to the
qualities and leadership
skills as set out in the
corporate management
restructure.
Leaders are developed to
lead the response to the
challenging agenda; the
Council is prepared for the
future and makes sustained
progress in its improvement
and transformation work.
Revised programme in place
using phased approach to
meet organisational
requirements.
- Revised longer term
strategy and plan
developed to meet
organisational
requirements.
- Interim phase 1
completed.
- Range of leadership
development activity in
place across management
tiers.
- Leaders developed to
lead challenging agenda
with feedback on positive
impact made, measured by
skills analysis surveys at
key points.
- Number of 1/2/3 tier
managers trained and
showing improvements in
awareness of key learning
points (measured through
skills analysis survey).
- Employee survey
question(s) on
management impact to
provide baseline and show
improvement over time. 
March 2026
June 2025
H/HR, ICT
&
OD/ODM
1
Page 128

Page 129

APPENDIX 1
HR and OD - SERVICE PLAN 2025-2028
4. Strategic
Outcome
or Priority
Action Planned Outcome Outcome measures Completion
target
Lead Priority
Rating
(1 high, 3 low,
4 for ongoing,
5 for on hold)
(CP) Strategic
Framework:
Financial,
Workforce,
Digital,
Transformation
Strategies. 
Performance
Management
Framework
Develop and implement
recruitment approach
based on core common
principles with flexibility
to address service
specific requirements
with creative solutions.
Promote employment
opportunities and raise
the profile of Moray
Council as an employer
of choice including
pathways for
development for
internal candidates and
youth employment.
Recruitment attracts high
calibre candidates
addressing service
resourcing needs.
Key corporate priorities and
projects are appropriately
resourced to ensure
completion and achievement
of objectives and outcomes.
Un-resourced areas are
flagged for consideration with
risks, issues and impacts
noted.
- Increased number of
candidates meeting criteria
for council vacancies in
hard to fill posts (specifics
to be developed further as
per service requirements)
- Attrition rates improved
(lowered) for areas with
high turnover (to be
developed further as per
service requirements).
- Reduced number of
repeat adverts and
reduction in time taken from
advert to first day of
employment.
- Feedback of positive
impact from managers
through personnel forum.
- Baseline for number of
career progression
opportunities established.
March 2026 HR
Manager
1
Workforce
Planning
Have in place actions
to address issues
arising from the
employee survey (Mar
25) and workforce
planning themes (Aug
2025)
Actions are implemented that
address issues raised.
- Employee Survey action
plan developed and agreed
at Committee
- Services progress
improvements as per action
plan
- Service level actions
arising from workforce
planning are progressed
within services and
monitored through the
Dec 2025 H/HR,ICT
&OD, OD
Mgr
1
Page 129

Page 130

APPENDIX 1
HR and OD - SERVICE PLAN 2025-2028
4. Strategic
Outcome
or Priority
Action Planned Outcome Outcome measures Completion
target
Lead Priority
Rating
(1 high, 3 low,
4 for ongoing,
5 for on hold)
regular performance
management framework
(CP) Strategic
Framework:
Financial,
Workforce,
Digital,
Transformation
Strategies. 
Performance
Management
Framework
Have in place fair and
competitive pay and
conditions that are
recognised and free of
bias
Gender Pay Gap and
equality issues are assessed
and mitigating actions put in
place if required.
- Assessment against
Scottish Government’s
Minority Ethnic recruitment
toolkit with improvement
actions identified
- Improvement in Moray's
ranking for Local
Government Benchmarking
Framework (Corp3c The
Gender Pay Gap (%) and
Corp3b % of the highest
paid 5% employees are
women) including within
Family Group.
- Increased number of
applications and
subsequent appointments
from ethnic minority groups.
Dec 2025 HR Mgr 2
(CP) Strategic
Framework:
Financial,
Workforce,
Digital,
Transformation
Strategies. 
Performance
Management
Framework
Develop an approach
that modernises the
conditions of service
and contribute towards
the future financial
sustainability of the
Council
Working hours and
conditions of service
modernised and sustainable
- Working week reduced to
35 hrs
- Working practices
reviewed and levels of
enhanced rates payable
reduced
- Terms and conditions
revised
Dec 2026 H/HR, HR
Mgr, OD
Mgr
2
Page 130

Page 131

APPENDIX 1
HR and OD - SERVICE PLAN 2025-2028
5. Service
Level
Outcomes or
Priorities
Action Planned Outcome Outcome
Measures
Completion
Target
Lead Priority
rating
Workforce
Planning and
Change
Continue to use
Transform approach to
change management and
relevant recruitment
arising from
transformation, change
and innovation.
Workforce change is
managed in a structured
and consistent way
achieves the desired
change including reduction
of headcount, or training
and development where
necessary, in accordance
with agreed policy approach
- Change implemented
as per Transformation
or other cross-cutting
corporate themes
- Reduced number of
employee relations
cases related to
workforce change
- Reduction in
headcount where
required
- Improved feedback
from Trades Unions
representatives in
relation to change
management exercises
March 2026 H/HR 1
Recruitment
and Retention
Develop a succession
planning approach that
builds internal capacity
and contributes to a
positive culture
Internal capacity is
increased with internal
candidates enabled to
prepare for alternative and
promoted positions.
Measures for number of
internal
applicants developed:
Year 1 –
measure/baseline
established
Year 2 – 5% increase in
volume of
internal applicants
Year 3 – 2.5% increase
5% increase in number
of career
progression
opportunities
October 2025 ODM 2
Organisational
Development
Develop and implement
initiatives to create a
culture where employees
are prepared and
Employees are empowered,
prepared and enabled to
embrace change.
- Employee survey
questions establish
baseline for monitoring
improvement on:
March 2026 ODM 1
Page 131

Page 132

APPENDIX 1
HR and OD - SERVICE PLAN 2025-2028
5. Service
Level
Outcomes or
Priorities
Action Planned Outcome Outcome
Measures
Completion
Target
Lead Priority
rating
supported to adjust to the
future changes that may
be required of them. 
Encourage flexibility and
adaptability to support
employees to adapt to
new ways of working
including embedding
digital skills and
competence to improve
efficiency and levels of
service.
- Impact of training and
development to support
new ways of working
- Levels of confidence
in being supported to be
flexible and adaptable
- Levels of confidence
in improved efficiency
and levels of service
achieved as a result of
change
- Positive feedback from
change exercises 
Communication
and
Engagement
Review and refresh
communication and
engagement approach
that supports corporate
and service specific
priorities
Corporate vision and
priorities are positively
promoted in public
communication and
engagement activities
including use of a range of
platforms e.g. social media
- % of engagement
levels increase for
public and community-
based consultations
- % of engagement
levels increase for
participatory budgeting
exercises
- 75% of employees
aware of council
priorities (employee
survey question)
- Citizens engagement
as measured by the
Scottish Social Attitudes
Survey will increase 
March 2026 H/HR
ODM
1
Best Value
Actions
Support workforce related
actions contained within
the Best Value Plan in
accordance with agreed
timescales
Effective distributive
leadership and collaborative
working.
- Employee survey
responses show greater
than 20% improvement
in leadership questions
June 2025 H/HR
ICT/OD
1
Page 132

Page 133

APPENDIX 1
HR and OD - SERVICE PLAN 2025-2028
5. Service
Level
Outcomes or
Priorities
Action Planned Outcome Outcome
Measures
Completion
Target
Lead Priority
rating
Organisational capacity to
deliver services,
communication that
promotes an improvement
focused culture and
effective arrangements to
support transformation.
Improved use of data
including exploration of use
of real time data where
possible
- Culture of cooperation
and partnership
evidenced in leadership
survey results
- Real time data
researched and
assessed with
timescale for
implementation if viable
Continuous
Improvement
Undertake self-evaluation
e.g. PSIF to measure and
evidence continuous
improvement
Assurance of continuous
improvement that
demonstrates Best Value
- PSIF completed and
reported with clear
actions where required.
October 2025 Service
Managers
2
Ensure revised
operational
implementation of
absence management
procedures are applied by
managers
Absence is managed
effectively, and levels of
absence are reduced
efficiently and timeously
- Reduction in number
of days absence per
employee and %
(CORP6a Sickness
absence days per
teacher reduced by 0.5
days per fte CORP6b
Sickness absence days
nonteacher reduced by
0.5 days per fte)
March 2026 Service
Managers
2Health and
Wellbeing
Page 133

Page 134

APPENDIX 1
HR and OD - SERVICE PLAN 2025-2028
5. Service
Level
Outcomes or
Priorities
Action Planned Outcome Outcome
Measures
Completion
Target
Lead Priority
rating
Proactively support the
Health & Wellbeing of
employees; review
measures to reduce
sickness absence
including day one
notification; ensure
revised operational
procedures are applied by
managers; provide
support for reducing
incidents of V&A in
schools
Measures are deployed that
support school-based staff
to feel safe at work and feel
equipped to manage
challenging behaviour
appropriately
- Review proactive
measures to reduce
sickness absence.
- Provide support for
reducing incidents of
violence and
aggression in schools
as set out in agreed
ASN action plan.  Work
with Trade Unions to
identify actions to
address short term
absence.
- Reduction in time
taken to manage
sickness absence
linked to incidents of
challenging behaviour
March 2026 H/HR
HRM
OD
2
Ensure key projects are
resourced, planned and
delivered within agreed
timescales and budget.
Projects are resourced
sufficiently to allow timely
completion of aims and
objectives
- Projects completed on
time and achieved
objectives
- Workload on project
and core staff is
managed and
manageable
October 2026 Service
Managers
1Workforce
Planning
Improve and develop
knowledge and skills
transfer across teams
Resilience of small teams
and lean service is improved
- Review purpose and
format of personnel
discussion group
- Create pathways and
establish measures for
December
2025
HoS/Service
Managers
1
Page 134

Page 135

APPENDIX 1
HR and OD - SERVICE PLAN 2025-2028
5. Service
Level
Outcomes or
Priorities
Action Planned Outcome Outcome
Measures
Completion
Target
Lead Priority
rating
transfer of knowledge
and skills
Page 135

Page 136

APPENDIX 2
ICT - SERVICE PLAN 2025-2028
1. Service
Definition:
ICT focuses on leveraging the maximum benefits from our ICT investment and ensuring that we have a sound ICT
infrastructure in place to support the Council’s strategic and service priorities. The service provides procurement of
systems/services, provision of equipment, such as desktop PCs desktop, laptops and smartphones, implementation
of solutions, compliance, application and infrastructure support.
2. Service
Resources:
Service Resources: 46.5 FTE
Budget: Capital £512k
Budget: Revenue: £3,953k
3. What have we identified for improvement in 2025
-2028?
What evidence did we use to identify this improvement?
Please add benchmark information wherever available and
relevant to the improvement.
Transformation of Council services
Business Intelligence and Insight
Digital Culture
Assurance
Future Advancement Planning
Corporate Plan 2024-2029
Best Value Assurance Report 2024
ICT Strategy 2025-2028
Transformation Strategy
Education ICT Strategy
ICT Security Policy
National direction for ICT
National Cyber Resilience programmes and lessons learned
Note: Progress against BV Actions will be monitored and reported out with Service Plan process
Page 136

Page 137

APPENDIX 2
ICT - SERVICE PLAN 2025-2028
4. Strategic
Outcome
or Priority
Action Planned Outcome Outcome
measures
Completion
target
Lead Priority
Rating
(1 high, 3 low,
4 for ongoing,
5 for on hold)
(CP) Strategic
Framework:
Financial,
Workforce,
Digital,
Transformation
Strategies. 
Performance
Management
Framework
Develop and expand the
Council’s digital approach
including potential use of AI,
IoT and data (e.g. Power BI),
also using the Digital Maturity
Assessment to facilitate
collaboration with shared best
practice. Increase the pace of
change by contributing to the
implementation of the
Transformation Strategy
projects e.g. digitisation,
digitalisation, LEAN in planned
programme of work, ensuring
un-resourced areas of digital
expansion are clearly
highlighted at early stage in
design and planning
Expansion and
enhancement of the use
of digital technologies
across services to
improve the efficient and
effective delivery of
services and ways of
working Project success
rate maximised through
sufficient capacity
without detracting from
business as usual
Increased number of
users of additional
online services
Increased use of digital
technology for
advancement of
learning and teaching
10% increased use of
digital technologies in
key strategic projects
March 2027 Information
Systems
Manager
1
(CP) Strategic
Framework:
Financial,
Workforce,
Digital,
Transformation
Strategies. 
Performance
Management
Framework
Develop a data approach to
enhance the value of data
through robust, open and
transparent access and that
forms the basis of a foundation
that supports key corporate
priorities e.g. Transformation
through the use of e.g. data
analytics, Power BI
Data and information is
held, accessed and
made available to
improve understanding
and better inform
decisions in a safe and
lawful way.
Develop and
implement a corporate
a data strategy and
plan for big data to
connect data, develop
analytics to inform and
drive service efficiency
March 2026 Information
Systems
Manager
1
(CP) Strategic
Framework:
Financial,
Workforce,
Digital,
Support and contribute to
development of Education ICT
Strategy that ensures
readiness for future digital
development that enhances
ICT infrastructure has
the technology, and the
capacity, required to
support future digital
development
Bandwidth increased
across school estate
(SWAN 2) Digital
learning devices and
31 March 2026
(end of Capita
SWAN
contract)
2029
Infrastructure
Manager
1
Page 137

Page 138

APPENDIX 2
ICT - SERVICE PLAN 2025-2028
4. Strategic
Outcome
or Priority
Action Planned Outcome Outcome
measures
Completion
target
Lead Priority
Rating
(1 high, 3 low,
4 for ongoing,
5 for on hold)
Transformation
Strategies. 
Performance
Management
Framework
learning and teaching including
the potential as well as the
possible impact of developing
technologies such as AI.
opportunities to facilitate
enhanced digital
learning and teaching
that suits long term
educational
requirements.
use of technology
increased:
Assessment of current
connectivity updated
Update cascaded to
EMs
Detailed plan of
requirements agreed
with BT
Implementation plan
for phase 2 agreed
with BT
Implementation
supported
MDM Project roll out
completed
Peer challenge
exercise planned and
undertaken
(as part of
SWAN 2)
31 Mar 2025
18 April 2025
30 April 2025
31 May 2025
31 March 2026
30 June 2025
August 2025
Page 138

Page 139

APPENDIX 2
ICT - SERVICE PLAN 2025-2028
5. Service
Level
Outcomes
or Priorities
Action Planned Outcome Outcome
Measures
Completion
Target
Lead Priority
rating
Transformation Support the Smarter
Working Project Phases with
hybrid working established
as the norm.
Hybrid working rolled out
across satellite properties.
Council has the capacity to
flex and Contract
homeworking in line with
the organisational, national
and regional requirements
All eligible satellite
properties equipped to
support hybrid working.
March 2026 Infrastructure
Manager
2
Service
Development
Support services to fully
utilise systems and
platforms to enhance
service delivery to the public
e.g. Gladstone in Sport and
Leisure, Spydus in Libraries,
Lagan (Customer Services).
Service specific systems
are fully functional, and
downtime is minimised. 
Enhancements and
upgrades are supported.
% of downtime is
reduced.
Enhancements and
upgrades are
completed within
prescribed timescales
per system.
March 2027 (or
per contractual
requirements)
Information
Systems
Manager
1
Assurance Cyber Resilience –
Implement enhanced
measures to manage cyber
security and resilience risks
Implementation of Cyber
Resilience Plan completed.
Business Continuity Plans /
work for corporate and
service cyber resilience
completed.
Plan implemented for
enhanced risk-based
approach. 80% of online
workforce completed
eLearning modules
Improved self-
assessment tool ratings
including certifications
(e.g. PSN Accreditation,
Cyber Essentials/Plus)
Reduced number of
high-risk actions arising
from annual health IT
health check
March 2027 Infrastructure
Manager
1
Improve visibility of
upcoming system
replacements to allow
resource to be planned
accordingly
Resource and capacity
management optimised,
allowing for early
identification of potential
issues
Clear oversight of
systems estate detailing
contract and support
end dates
October 2025 Information
Systems
Manager
2Forward
Planning
Page 139

Page 140

APPENDIX 2
ICT - SERVICE PLAN 2025-2028
5. Service
Level
Outcomes
or Priorities
Action Planned Outcome Outcome
Measures
Completion
Target
Lead Priority
rating
Identify, plan, schedule and
support large scale
corporate system
replacements
Corporate system
replacements (Lagan, Care
First, Content Management
System) are replaced
efficiently and timeously in
accordance with agreed
council procedures
Systems replaced within
scheduled timeframes
Compliance with
procurement procedures
and due technical
diligence
March 2027 Information
Systems
Manager
2
Best Value
Actions
Implement ICT and digital
related actions contained
within the Best Value Plan in
accordance with agreed
timescales
Resilience plans in place
for information systems as
part of wider
Digital/Resilience Strategy
Implementation of
Cyber Resilience Plan
Complete Business
Continuity Plans/work
for corporate and cyber
resilience
March 2026 H/HR
Information
Systems
Manager
Infrastructure
Manager
1
Continuous
Improvement
Undertake self-evaluation
e.g. PSIF to measure and
evidence continuous
improvement
Assurance of continuous
improvement that
demonstrates Best Value
PSIF complete and
reported with clear
actions where required
October 2025 Service
Managers
2
Health and
Wellbeing
Ensure revised operational
implementation of absence
management procedures
are applied by managers
Absence is managed
effectively, and levels of
absence are reduced
efficiently and timeously
Reduction in number of
days absence per
employee and %.
March 2026 Service
Managers
2
Ensure key projects are
resourced, planned and
delivered within agreed
timescales and budget.
Projects are resourced
sufficiently to allow timely
completion of aims and
objectives
- Projects completed on
time and achieved
objectives
- Workload on project
and core staff is
managed and
manageable
October 2026 Service
Managers
1Workforce
Planning
Improve and develop
knowledge and skills
transfer across teams
Resilience of small teams
and lean service is
improved
- Review purpose and
format of personnel
discussion group
- Create pathways and
establish measures for
December
2025
HoS/Service
Managers
1
Page 140

Page 141

APPENDIX 2
ICT - SERVICE PLAN 2025-2028
5. Service
Level
Outcomes
or Priorities
Action Planned Outcome Outcome
Measures
Completion
Target
Lead Priority
rating
transfer of knowledge
and skills
Page 141

Page 142

APPENDIX 3
GOVERNANCE, STRATEGY AND PERFORMANCE - SERVICE PLAN 2025-2028
1. Service
Definition:
Governance Strategy and Performance
Services to the public: Customer Services (contact centre and access points), Revenues, NDR, Benefits, Money
Advice, Licensing, Registrars Service, Elections, FOI and Data Protection
Support services: Legal (inc Monitoring Officer), Licensing, Committee services. Elected Members support, Mail
room, SharePoint, Customer services Support, Strategy and Performance, Audit and Risk, Records Management
2. Service
Resources:
Staff 135 FTE
Budget Revenue: £5.977M
3. What have we identified for improvement in 2025-
2028?
What evidence did we use to identify this improvement?
Please add benchmark information wherever available and
relevant to the improvement.
Implement framework for Continuous Improvement across
council services
Best Value report (Feb. 2024) highlighted need for improved process /
programme for self-evaluation. 
Digitise Services Find efficiency and improve customer service through digitising of services
e.g. Customer Services self-service – CRM, AI and Out of Hours service
Delivery Frameworks - LOIP Agree LOIP outcomes and indicators
4. Strategic
Outcome or
Priority
Action Planned Outcome Outcome
measures
Completion
target
Lead Priority
Rating
(1 high, 3
low, 4 for
ongoing,
5 for on
hold)
Re-establish a framework for
Continuous Improvement
across council services with a
timetable and guidance
Drive continuous
improvement across
services
Demonstrate best value
Develop / re-
activate self-
assessment
framework
Agree timetable /
programme for
review
Report outcome
through service
performance
31 July 2025 Strategy and
Performance
Manager
2
Page 142

Page 143

APPENDIX 3
GOVERNANCE, STRATEGY AND PERFORMANCE - SERVICE PLAN 2025-2028
4. Strategic
Outcome or
Priority
Action Planned Outcome Outcome
measures
Completion
target
Lead Priority
Rating
(1 high, 3
low, 4 for
ongoing,
5 for on
hold)
reports (6 monthly
going forward)
(CP) Strategic
Framework:
Financial,
Workforce, Digital,
Transformation
Strategies.
Performance
Management
Framework
Guide relevant services to
complete assessments by
March 2026.
Cycle is embedded. March 2026 2
5. Service
Level
Outcomes or
Priorities
Action Planned Outcome Outcome
Measures
Completion
Target
Lead Priority
rating
Customer Services:
Introduce an updated or new
Customer Relationship
Management (CRM) solution
Improved customer
experience, service
efficiencies, increased
customer self service
More accessible
and efficient
service to the
public
Develop
business case
30 April  25
Complete
Tender process
October 25
Implement
solution with
services
31 March 2026
Customer
Services Manager
2Digital
Transformation
and Efficiency
Page 143

Page 144

APPENDIX 3
GOVERNANCE, STRATEGY AND PERFORMANCE - SERVICE PLAN 2025-2028
5. Service
Level
Outcomes or
Priorities
Action Planned Outcome Outcome
Measures
Completion
Target
Lead Priority
rating
Customer Services:
Review out of hours phone
service along with housing
Calls are rationalised and
a less time intensive move
from housing out of hours
service
Successful move
onto a new
system
30 July 2025 Customer
Services Manager
2
Benefits / Money Advice:
Develop Benefits e-form
Service efficiency savings
Improved customer
service
% of total
applications
successfully
completed
through e-form
Reduction in
application
processing time
31 December
2025
Benefits and
Money Advice
Manager
2
Benefits / Money Advice:
Establish whether there is a
viable case for further
centralisation of means testing
Determine whether a
staffing efficiency and
maximisation of council
resources is achievable
Completion of
business case 
31 December
2025
Benefits and
Money Advice
Manager
3
Citizens Advice SLA Finalise the terms of SLA
in terms of draft presented
to committee
Completion of
Citizens Advice
SLA
August 2025 Benefits and
Money Advice
Manager
2
Improved
Governance
Internal Audit: Work with
critical services to ensure
business continuity
arrangements are up to date
Business Impact
Assessments reviewed for
all critical services and
business continuity plans
are in place for critical
services.
To aid appropriate
response to
unplanned events
and
circumstances 
Assess which
services are
deemed critical
services
April 2025
Critical
services
reviewed and
sustainable
ongoing cycle
31 March 2026
Head of GSP 2
Page 144

Page 145

APPENDIX 3
GOVERNANCE, STRATEGY AND PERFORMANCE - SERVICE PLAN 2025-2028
5. Service
Level
Outcomes or
Priorities
Action Planned Outcome Outcome
Measures
Completion
Target
Lead Priority
rating
Strategy and Performance:
Finalise Delivery Frameworks
and reporting arrangements
following review of LOIP
Board can measure
progress against agreed
outcomes
Agree suitable
indicators 
31 December
2025
Strategy and
Performance
Manager
2
Strategy and Performance:
Further development of
Ideagen for performance
reporting
Creation of dashboards for
reporting
Agree format and
reporting of
dashboards
31 March 2026 Strategy and
Performance
Manager
3
Strategy and Performance:
Assist in the transition of
survey to engagement platform
Council surveys to be
incorporated into the
engagement platform
Surveys
conducted
through
engagement
platform
31 March 2026 Strategy and
Performance
Manager
4
Strategy and Performance:
Child Friendly Complaints
embedded into complaints
process
Child Friendly Complaints
recorded and reported as
part of complaints process
% of CFCs being
recorded
monitored and
reported
31 March 2026 Complaint Officer 3
Performance
Management
Strategy and Performance:
Review performance
management framework
Clarify reporting dates and
venues for performance
data.
Timely reporting to
committee
November
2025
Strategy and
Performance
Manager
1
Legal Services Legal Services:
Identify means to increase
staffing levels
Improve resilience of legal
advice service
Better balance in
internal vs
external costs
31 March 2026 Legal Service
Manager
2
Health &
Wellbeing
Ensure revised operational
implementation of absence
management procedures are
applied by managers
Absence is managed
effectively and levels of
absence are reduced
efficiently and timeously
Reduction in
number of days
absence per
employee
31 March 2026 Head of Service 2
Page 145

Page 146

Page 146

Page 147

Report to: Meeting Date:Corporate Committee 10 June 2025
Report by: Report No:Depute Chief Executive
(Education,
Communities and
Organisational
Development)
HR011/25
Author: Katrina McGillivray Contact
Email:
organisational.development
@moray.gov.uk
Subject: Succession Planning
1. PURPOSE
☒ For Decision      ☐  For Information
1.1 The purpose of this report is to consider and approve the proposed approach to
Succession Planning.
1.2 This report is submitted to Committee in terms of Section III (B) (24) of the Council’s
Scheme of Administration relating to the policy and practices of the Council.
2. SUMMARY
2.1 This report outlines a proposed approach for developing a Succession Planning
framework within the Council aimed at enhancing internal capacity and fostering a
positive workplace culture, with a phased approach suggested. The proposed approach
is based on best practice as applied to the particular operating context of the Council,
including resource available.
3. RECOMMENDATIONS
3.1 It is recommended that Committee consider and approve the proposed approach
for developing a Succession Planning framework outlined in this report.:
Author Name: Katrina McGillivray
Job Title: Organisational Development Manager
Item 14.
Page 147

Page 148

4. BACKGROUND AND CONTEXT
4.1 The Corporate Workforce Plan 2024/25 and HR and OD Service Plan 2024/25 requires
that an approach be developed to Succession Planning that builds internal capacity and
contributes to a positive culture. The development of a framework is also referenced in
the Best Value Thematic report on Workforce Innovation 2023/24.
4.2 The planned outcome is to build internal capacity through workforce development,
career progression and skills development whilst ensuring equal opportunity so that
internal candidates are enabled to put themselves forwards for development
opportunities that provide the required experience and skill set to apply for alternative or
promoted positions.
4.3
4.4
4.5
In general, almost a third of the Council’s workforce is aged 55 and above (2024/25 Q3
figures). Many will have the opportunity to access any pension due and may choose to
retire before what may be considered to be “normal retirement age”. This demonstrates
the need for a robust approach to succession planning.
More than three quarters of senior leadership is aged 55 and above, suggesting that
there should be an initial focus on leadership capacity and requirements to third tier level
aligned to the key areas of leadership development and any emerging developing
themes resulting from organisational change, followed by identification and support for
other critical posts identified through the workforce planning process.  In addition, one of
the objectives of the corporate management restructure is to “create pathways to
address succession planning challenges over the next 12 to 24 months.”
However, it is acknowledged that the application of the succession planning approach is
as important at the front line of service delivery and leaders and managers are
encouraged to apply the approach to their service areas as appropriate.
5. PROPOSALS
5.1 A proposed approach to the development of a succession planning framework is outlined
in this report and the appendices. It is considered that it would be appropriate to take a
phased approach to this as follows:
5.2
5.3
Phase 1 – Development and Agreement of Approach (by June 2025)
Develop and agree approach that is achievable within the Moray Council context.
An outline of an approach has been developed which is based on best practice and
relevant research, tailored to the Council context. (Appendix I) This is supported by
information and guidance on the approach (Appendix II) and some tools and templates
(Appendix III).
Questions were included in the workforce planning meetings with Heads of Service and
their management teams over January and February 2025 with outcomes reported back
as part of the agreed workforce planning process.
Page 148

Page 149

5.4
Consultation has taken place with the Personnel Forum, Trade Union/Officer Group,
ECLT and the LNCT Joint Secretaries with comments and feedback taken account of in
the development of the proposed approach.
In summary the approach outlines the importance of building internal capacity while
ensuring equal opportunity for all candidates. It details a flexible toolkit designed to
support workforce planning and development, aiming to ensure a skilled and motivated
workforce to meet future organisational demands.
The main elements of the approach are as follows:
Workforce Priorities: Recruitment and retention are central to Moray Council's workforce
strategy, with succession planning as a key element to build internal capacity and
support equal opportunities.
Internal Candidate Development: The approach encourages internal candidates to gain
confidence and skills for future roles, whilst also ensuring that all positions are
advertised in line with agreed council recruitment policy and procedures.
Toolkit Utilisation: The toolkit is adaptable for use by a variety of services, providing a
framework to develop tailored succession plans that align with the council's objectives.
Identifying Critical Roles: Succession planning focuses on identifying key roles within the
organisation, including leadership positions, to mitigate risks associated with workforce
changes.
Engagement and Empowerment: The council aims to empower employees to pursue
development opportunities through various measures such as training, mentoring, and
leadership development initiatives.
Review and Reporting Process: A structured review process is established for identifying
critical roles and potential successors, ensuring that workforce planning aligns with
corporate objectives and identifies gaps in succession.
The information and guidance along with the tools and templates available are provided
to support the approach and cover the following:
Impact of Vacancy on Service Delivery: Vacancies can significantly affect the delivery of
services, necessitating effective succession planning to mitigate risks.
Difficulty in Filling Vacancies: There are challenges associated with filling critical roles,
which can impact organisational performance.
Expected Behaviours: The document outlines expected behaviours for employees at
various readiness levels, indicating the importance of capability and ambition.
Development Planning: Emphasis is placed on development actions to prepare
employees for future roles, including career conversations and identifying critical roles.
Page 149

Page 150

Strategic Capabilities: Questions are posed regarding the leadership capabilities
required to deliver strategic plans over the next five years and how to address skills
gaps.
Recognising Contribution and Potential: Leaders and managers are encouraged to
assess employee potential and aspirations to align with service needs, documenting
outcomes effectively.
Service Level Succession Planning: Identifying employees for temporary cover is
recommended to ensure continuity in service delivery.
Development Opportunities:  a mix of on-the-job experiences, exposure to mentors, and
formal education as effective development strategies for employees is recommended.
5.5
5.6
Phase 2 - Operational Implementation (July – August 2025)
The approach will be communicated through an agreed plan with advice and guidance
issued to ensure the implementation of the approach including provision of support to
action development opportunities identified to ensure workforce and skills development.
Consideration of how internal, informal development opportunities can be created,
facilitated and where necessary co-ordinated is required, with an outline of the type of
ongoing informal support that could be provided along with any required formal support
provided in Appendix 2a of Appendix III.
Embed in workforce planning cycle and report on outcomes in line with revised
timescales, ensuring that there is reference to the progress of the succession planning
approach in the workforce reports presented to Corporate Committee as part of the
agreed workforce planning reporting framework. Reporting will be for 2026/27 to allow
for changes as a result of the revised management structure and the Phase 2 review,
enabling a full cycle of information arising from the implementation of the succession
planning approach.
6. SUMMARY OF IMPLICATIONS
6.1 The table below shows whether risks and implications apply if the recommendations are
agreed:
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement
Plan)
x
Policy and Legal x
Financial x
Risk x
Staffing x
Best Value and Transformation x
Property x
Information Communications Technology/Digital x
Equalities. Social Inclusion and Economic Impact x
Page 150

Page 151

Climate Change and Biodiversity Impact x
6.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans.
The development of a succession planning approach will support the Council and
services to deliver on the priorities outlined by ensuring an appropriately skilled,
motivated and flexible workforce.
a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following Council
Plan strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population
6.3 Policy and Legal
The Council has in place a suite of employment policies and the succession planning
approach has been developed in this context, for example, Recruitment and Selection
Policy and Procedures.
Relevant legislation includes, for example, Local Government and Housing Act 1989 and
Equality Act 2010.
6.4 Financial
There are likely to be costs associated with learning and development requirements to
support the outcomes for the application of the succession planning approach in practice
and these are likely to vary. It is not possible at this stage to quantify exact costs but it is
proposed that a proportion of the central training budget is ring fenced for formal learning
and development opportunities to enable and support succession planning and
continuing professional development which will also contribute to a “grow your own
approach”. For example, a proportion based on 10% of the overall training budget would
be in the region of £20k. Analysis of the feedback from the recent workforce planning
meetings and the application of the succession planning approach going forward could
be used to try to provide an evidence base as to whether or not this amount would be
sufficient to meet anticipated demand.
Page 151

Page 152

One off Costs: N/A
Service
Area
Budget Budget
Years
Proposed
Spend
this Year
Virement
From
Other
Comment
s
Annually Recurring Costs: N/A
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable
)
Other
Comment
s
6.5 Risk
The development of a succession planning approach will support the mitigation of risks
associated with ensuring a skilled, motivated and flexible workforce able to deliver on the
Council’s priorities.
6.6 Staffing
Leaders are key to the effectiveness of the succession planning approach. Time is
required to identify the gaps and the potential across teams and services, to support the
provision of development opportunities, to support individual employees in their
development and to manage the impact of ongoing demands on the service, whilst
employees are involved in development activity.
6.7 Best Value and Transformation
The development of a succession planning approach will contribute to the best value
and transformation agenda by ensuring a skilled, motivated and flexible workforce to
deliver on these priorities and by harnessing and developing the potential of the existing
workforce in preparedness for future opportunities.
6.8 Property
None
6.9 Information Communications/Technology/Digital
There are no immediate implications, however, it may be beneficial to explore the
feasibility of developing a digital process for data gathering, recording and analysis.
6.10 Equalities, Social Inclusion and Economic Impact
The requirements of the Equality Act 2010 are relevant in the application of the
succession planning approach.
6.11 Climate Change and Biodiversity Impacts
None.
7. CONSULTATION
Page 152

Page 153

7.1 This report has been prepared in consultation with Personnel Forum, Trade
Union/Officer Group, ECLT, LNCT Joint Secretaries and any comments made have been
incorporated into the report. This includes reference to the particular arrangements that
are already in place for Teaching Staff.
8. BACKGROUND PAPERS
8.1
Page 153

Page 154

Appendix I – Proposed Approach
Succession Planning Approach
(with Toolkit)
Approach to building internal capacity and contributing to a positive culture.
Introduction
One of the main workforce priorities in Moray Council’s workforce and organisational development strategy and plan is Recruitment
and Retention. The development of an approach to succession planning that builds internal capacity whilst ensuring equal
opportunity is a key part of this work alongside other resourcing strategies including Transform, redeployment, external sourcing
and senior recruitment.
It is important to note that all posts will be advertised in accordance with Council procedures and the recruitment process will
continue to operate through consideration of the merit of candidates. The succession planning approach is to support the readiness
of internal candidates and provide them with the confidence and skills to be considered for posts when they become vacant.
The toolkit is not prescriptive. It provides a framework which is flexible enough for use and adaptation across services. It is part of
the range of tools available to support the Council’s approach to workforce planning, providing support to services to develop
succession plans appropriate to their needs.
This is important to support the delivery of the Corporate Plan through the Workforce Strategy and Plan to enable the council to
develop and maintain a skilled, motivated and flexible workforce and to adapt as an organisation to be able to ensure it can meet
both the current and future demands and deliver sustainable services to the community. This includes identifying, managing and
mitigating organisational risks related to the current and future workforce.
Page 154

Page 155

The aim is to have an increased number of internal applicants that are confident in applying for promoted posts utilising a range of
measures including redeployment, secondment, acting up arrangements, shadowing, further education, training, leadership
development training, qualifications, mentoring and projects.
There are particular arrangements already in place for Teaching Staff and these are referenced in the information and guidance
supporting the succession planning approach.
Succession Planning Approach
Succession planning is a process to identify employees who would be suitable for future vacancies and put in place plans to ensure
they are developed and prepared to take on the roles. There may be both short-term and long-term potential successors identified
with supporting development actions. Normally succession planning is restricted to key posts in an organisation, usually at the top
tiers of management, although there may be critical roles identified at other levels of the organisation.
The Council’s approach to succession planning is one where internal candidates are to be encouraged, empowered and enabled to
develop a growth mindset and put themselves forwards for development opportunities that provide the required experience and skill
set to apply for alternative or promoted positions in accordance with the Council’s Recruitment and Selection Policy and
Procedures. Supporting the development of internal candidates is key to organisational improvement and mitigating the risks
experienced by the organisation through the difficulties with recruitment. Engaging, developing and retaining the workforce is key to
the delivery of corporate objectives and priorities.
To enable this approach, a range of succession planning tools are provided that can be used to:
• Assess the skills, experience, legal responsibilities, qualifications, and management responsibilities and highlight critical
roles and other roles as required.
• Encourage employees to be interested in their own development and empower and enable those who want to develop.
• Develop the skills and abilities of employees interested in progression to potentially fulfil the council’s critical roles in the
future.
• Identify gaps in succession that may represent risks to continuity of service delivery.
Page 155

Page 156

Evidence base:
In general, almost a third of the Council’s workforce is aged 55 and above (2024/25 Q3 figures). Many will have the opportunity to
access any pension due and may choose to retire before what may be considered to be “normal retirement age”. This
demonstrates the need for a robust approach to succession planning.
More than three quarters of the senior leadership cohort (ECLT) is aged 55 and above, suggesting that there should be an initial
focus on leadership capacity and requirements to third tier level aligned to the key areas of leadership development and any
emerging developing themes resulting from organisational change, followed by identification and support for other critical posts
identified through the workforce planning process.  However, it is acknowledged that the application of the succession planning
approach is as important at the front line of service delivery and leaders are encouraged to apply the approach to their service
areas as appropriate.
Key outcomes of succession planning approach:
A combined understanding across the organisation of the skills necessary to ensure delivery of corporate objectives and priorities.
Identification of critical roles as a mandatory element of the approach.
Other key roles to be rated as required according to evidenced need by Heads of Service and Service Managers.
A comprehensive analysis of the workforce and developed succession plans which aim to relieve contingency risk and highlight
potential gaps in the future.
Framework of support and development opportunities including informal learning and skills development and formal training and
qualifications as required.
Development actions for key groups or individuals, prioritised according to identified needs.
Responsibilities:
CLT – ensure that there is a shared understanding of succession planning and development requirements across the organisation
and agree prioritisation according to identified needs. Ensure the necessary resource is in place to support the effective
Page 156

Page 157

implementation of the approach and ensure that all steps are taken to future proof workforce requirements both in terms of people
and posts to manage and mitigate organisational risk.
Heads of Service – ensure that a succession plan(s) are developed for service areas within their remit. This can be achieved
through the application of the toolkit, adapted as necessary, by service managers and discussed as a service management team to
identify key posts, identify key people, identify gaps.
Head of HR, ICT and OD – ensure that the outcomes and key issues regarding succession planning and development at a service
level are collated and reported to CLT as part of the reporting arrangements on workforce planning.
Succession Planning Process
An outline of steps in the process is provided with further details to support the work required at each of these stages below.
Review Process
1. Heads of Service and Service Managers to identify critical roles, gaps and potential successors using the succession
planning tools and templates and workforce data provided through Power Bi. (Feb - Mar)
2. Discussion at service level with service managers led by Heads of Service. (April)
3. Discussion at annual workforce planning meetings; identified needs from a service level will inform corporate position,
reported as part of the workforce planning reporting framework, including reference in the annual and interim workforce
reports to Corporate Committee on progress with succession planning. (Discussions held in May; reporting in August))
4. Particular attention to roles where there is no one identified as a potential successor at service level, for escalation to
corporate, organisation wide level at CMT. (June/July)
5. When the succession planning approach has been applied across services, CLT will agree a prioritised plan based on
identified need from corporate plan, workforce strategy and plan and service level requirements, including identifying
potential successors from other service areas across the organisation. (June/July)
6. Heads of Service will ensure that all leaders and managers responsible for succession planning have access to the
appropriate level of information included in the agreed service level succession plan as well as corporate level plan
regarding supply and demand, to enable the appropriate conversations to take place with employees and ensure
development actions are agreed and implemented. (Sept – March)
Page 157

Page 158

7. Resourcing requirements must be identified as part of the plan and requests for support to deliver on planned outcomes
included in the annual training plan request or through training request form is identified during the year.
8. Heads of Service and Service Managers must ensure that ERDPs are rolled out across service areas and that all employees
have the opportunity to discuss aspirations and development opportunities as appropriate. Please note that work is being
undertaken to refresh the approach to ERDPs with proposals to be presented during 25/26.
Page 158

Page 159

Appendix II – Information and Guidance
Information and Guidance to support implementation of the approach.
Strategic Planning
In order to facilitate and enable the identification of critical roles, an awareness and understanding of the Council’s Corporate Plan,
Workforce Strategy and Plan and key priorities and outcomes is required along with the Service Plans for the respective service
areas.
This provides the context within which Heads of Service and DMTs need to identify roles which are critical to the delivery of their
Service Plans in support of the Corporate Plan priorities and mitigate organisational risks arising from the workforce in terms of
having the right people in the right posts at the right time.
Page 159

Page 160

Role Planning (Demand)
Critical roles need to be identified, rated and prioritised, using the resources available as appropriate, to prepare questions to
assess and test thinking and document outcomes. (succession planner template can be used).
Critical roles are those, without which, the key deliverables of the service plan can’t be achieved as planned.
An annual review of critical roles should be planned (Feb- Apr) to dovetail with the annual workforce planning meetings (held in
May) so that the key issues and requirements can be discussed. Consideration will also need to be given to new roles / posts
created within the year.
Assessment and Identification of Critical Roles
Community Planning
Community Planning
Community Planning
Community Planning
Corporate Planning
Corporate Planning
Corporate Planning
Corporate Planning
Service Planning
Service Planning
Service Planning
Service Planning
Team Planning
Team Planning
Team Planning
Team Planning
Individual Planning
Individual Planning
Individual Planning
Individual Planning
Team plans – Operational
document setti ng out the
priorities for the team,
which come in part from
hierarchy of plans.
Focuses on shorter- term
tactical & operational
activities supporting the
delivery of the Service
Plan & strategies.
Team plans – Operational
document setti ng out the
priorities for the team,
which come in part from
hierarchy of plans.
Focuses on shorter- term
tactical & operational
activities supporting the
delivery of the Service
Plan & strategies.
Team plans – Operational
document setti ng out the
priorities for the team,
which come in part from
hierarchy of plans.
Focuses on shorter- term
tactical & operational
activities supporting the
delivery of the Service
Plan & strategies.
Team plans – Operational
document setti ng out the
priorities for the team,
which come in part from
hierarchy of plans.
Focuses on shorter- term
tactical & operational
activities supporting the
delivery of the Service
Plan & strategies.
Career conversations,
ERDPs and PRDs –focuses
primarily on the delivery of
day-to- day operational
activities supporting the
delivery of the Team plan.
Career conversations,
ERDPs and PRDs –focuses
primarily on the delivery of
day-to- day operational
activities supporting the
delivery of the Team plan.
Service Plan & Strategies –
Focuses on forward
planning for medium-term
activities supporting
delivery of LOIP &
Corporate Plan.
What the service aims to
develop over the coming
year and sets out
performance targets.
Service Plan & Strategies –
Focuses on forward
planning for medium-term
activities supporting
delivery of LOIP &
Corporate Plan.
What the service aims to
develop over the coming
year and sets out
performance targets.
Service Plan & Strategies –
Focuses on forward
planning for medium-term
activities supporting
delivery of LOIP &
Corporate Plan.
What the service aims to
develop over the coming
year and sets out
performance targets.
Service Plan & Strategies –
Focuses on forward
planning for medium-term
activities supporting
delivery of LOIP &
Corporate Plan.
What the service aims to
develop over the coming
year and sets out
performance targets.
Corporate Plan,
Workforce Strategy and
Plan & Transformational
Projects –
Focuses on the highest
level, long-term
strategic organisational
outcomes.
Corporate Plan,
Workforce Strategy and
Plan & Transformational
Projects –
Focuses on the highest
level, long-term
strategic organisational
outcomes.
Corporate Plan,
Workforce Strategy and
Plan & Transformational
Projects –
Focuses on the highest
level, long-term
strategic organisational
outcomes.
Corporate Plan,
Workforce Strategy and
Plan & Transformational
Projects –
Focuses on the highest
level, long-term
strategic organisational
outcomes.
Local Outcomes
Improvement Plan (LOIP)
-Focuses on the highest
level, long-term strategic
community outcomes.
Sets out the series of high
level indicators against
which the performance of
the community planning
partnership will be
assessed.
Local Outcomes
Improvement Plan (LOIP)
-Focuses on the highest
level, long-term strategic
community outcomes.
Sets out the series of high
level indicators against
which the performance of
the community planning
partnership will be
assessed.
Outcomes:Local
Outcomes Improvement
Plan (LOIP) -Focuses on
the highest level, long-
term strategic community
outcomes. Sets out the
series of high level
indicators against which
the performance of the
community planning
partnership will be
assessed.
Local Outcomes
Improvement Plan (LOIP)
-Focuses on the highest
level, long-term strategic
community outcomes.
Sets out the series of high
level indicators against
which the performance of
the community planning
partnership will be
assessed.
Page 160

Page 161

Through the effective use of ERDP/PRD/ Career conversations, workforce planning meetings and other associated tools, leaders
and managers will be able to determine the likelihood of these roles becoming vacant, within what timescale and the reasons such
as retirement, resignation, promotion, or competitive job market. Information can be documented using the succession planner
template.
People Planning (Supply)
The profile of potential across teams and services should be captured in the succession planner using the tools available as
required.
The leader/manager assesses the information gathered from the role planning element of the process along with information from
ERDPs/PRDs and Career Conversations to identify employees who could be supported to be ready to apply for alternative or
promoted positions. They would compare employees’ skills, experience and qualifications against future vacant job descriptions
and job specifications to establish suitability for consideration for possible future roles.
Assessment of Supply and Demand:
If there are clear gaps where someone is leaving in the next year, cross reference with those employees who want to progress and
ensure employees with the most suitable skills, knowledge, experience, and qualifications to be potential successors are identified
and developed as appropriate.
No immediate or short term capacity:
If no one is ready now or in the next 1-3 years, look at how existing team members can be developed and consider whether there
may be employee(s) in other services of the Council that may be ready or could be developed into the role(s). Heads of Service
should report to CLT on roles where there is an urgent succession planning risk that has not been reported through the annual
reporting cycle.
Capacity now but no role identified:
If there are employees that are ready now and a role isn’t yet available or may not be available in the near future, it’s key to keep
those individuals engaged with their development. These employees would be supported with appropriate development
opportunities which may include, e.g. secondments, project work across the Council.
Page 161

Page 162

Heads of Service and Service Managers should discuss succession planning at service level in preparation for discussion at the
annual workforce planning meeting as part of the Council’s workforce planning framework with outcomes reported to CLT to enable
a corporate, organisation wide view of succession planning and development requirements.
Career Conversations
The aim of a Career Conversation is to establish the employee’s career aspirations within the organisation with the outcome
recorded to identify the direction, timescales and motivators to progress.
As part of annual ERDP/PRD, leader/ manager asks if the employee would like a career conversation
If yes:
Arrange a follow up career conversation meeting
Document the outcomes. The career conversation template can be used for this purpose. (Appendix 2)
If no:
Leader/Manager records this along with the ERDP/PRD outcomes.
Inform the employee that a career conversation meeting can be arranged at any point should their situation or preference change.
Where there are employees marked for progression but there is no identified role at the time, ideally opportunities for further
development, e.g project work, secondments, work experience, training would be identified and actioned as appropriate.  This
should encourage active engagement in their development and readiness for the future.
Heads of Service and Service Managers need to review information on demand and supply and agree actions.
Development Actions
Actions arising from discussions with employees who have indicated their desire to progress about their aspirations and
development should be documented along with timescales agreed. (career conversation template can be used)
Page 162

Page 163

Development actions could include mentoring senior roles, shadowing within another service, training opportunities, undertaking a
qualification and further stretch / experience opportunities. (examples are provided in career conversation template)
Heads of Service are responsible for highlighting any training requirements identified on the annual training request spreadsheet
and if throughout the year, via a training request form.
The information gathered will enable the council to have oversight of forecasted challenges and inform any changes required to the
approach to recruitment and selection depending on the risks identified. The information will also be critical to identifying the
resource provision through the central training budget according to the training needs identified.
Where there is a need for professional qualifications, for example, to support the delivery of statutory services, it should be noted
that this is likely to have a longer lead in time than some other development actions and this should be factored into succession
plans. There may need to be interim arrangements made to narrow the gap.
It is important that there is a balance struck with regard to the capacity to support and undertake development opportunities. This
will be agreed between leaders/managers and employees, based on the individual circumstances of each case and documented in
the development action plan. It is expected that there will be time for development provided for within the working week as well as
an element of individual’s personal time, where, for example, a qualification or some form of formal training and development is
being undertaken.
Outcomes
To ensure that internal candidates are encouraged, empowered and enabled to develop a growth mindset and put themselves
forwards for development opportunities that provide the required experience and skill set to apply for alternative or promoted
positions.
To identify critical roles that are key to the delivery of the council’s corporate and service plans.
Heads of Service and Service Managers clearly understand skills gaps, succession risks and have strategies in place to address
them, supporting evidence led recruitment, deployment, career progression and promotion opportunities.
Page 163

Page 164

To leverage any flexibility within services to provide experience and invest in employees to accelerate personal and professional
growth to support delivery of the Council’s priorities.
To evidence increased engagement as employees gain confidence and belief in the commitment to investing in their learning and
development.
Measures:
Measures for number of internal applicants developed:
Year 1 2025/26 – measure/baseline developed
Year 2 2026/27 – 5% increase in volume of internal applicants
Year 3 2027/28 – 2.5% increase
5% increase in number of career progression opportunities
Number of internal candidates applying for promoted posts (Grade 10 and above)
Number of internal candidates applying for promoted posts (Grade 10 and above) as a result of development opportunities
identified through a career conversation.
Number of internal appointments where employee has increased grade (all Grades ) as a result of development opportunities
identified through a career conversation.
Measures to be reported as part of annual workforce planning reporting arrangements.
Toolkit and Templates (see separate document – Appendix III below)
Appendix 1 – Preparation for application of succession planning approach.
Appendix 2 – Template to use to frame career conversation with employees interested in developing and progressing.
Appendix 2a – Informal and Formal Development Opportunities
Appendix 3 – Indicators of potential tool.
Page 164

Page 165

Appendix 4 – Succession Planner template
Appendix 5 - Flow chart of steps
Appendix 6 – Information relevant for Teaching Staff
Page 165

Page 166

Appendix III – Toolkit and Templates
Appendix 1: Preparation: Questions and Prompts that can be used to consider succession planning
requirements
Demand
Strategic
capabilities
 What leadership capabilities are required to deliver strategic and service plans over the next 5
years?
 Are these capabilities within the service? If so, where?
 What and where are the biggest capability/skills gaps?
 What action is being taken at a service level to build the capabilities needed over the next 5
years?
 What other actions are needed over the next 3-5yrs to build this capability?
 What does good look like?
Structures  How might the leadership structure evolve over the next 5 years?
 What impact might transformation and change have on the structure of the service?
 Which roles need to be highlighted in the structure given their strategic relevance to the delivery
of council priorities?
 What new roles may need to be created?
 What development opportunities could you provide that will prepare employees for the future?
Critical roles  Which roles within the existing structure are critical to delivering the councils priorities – in terms
of leadership, technical/specialist skills, knowledge and qualifications?
 Which roles are critical to delivering on priorities, but are difficult to fill / in scarce supply?
 Reference to risk matrix below to help identify critical roles.
Supply
Recognising
contribution and
potential
 Consider the potential of individuals and teams using the tools available as required.
 Do you know what their aspirations are and whether or not they align with what the service
requires?
 The questions provided in the career conversation template can be used as prompts.
 Consider the evidence base for the assessment on – e.g. ERDP, feedback from others, track
record of strong performance in role, behaviours demonstrated, ability to deal with complexity,
shows ambition to move into larger and more complex roles and evidence that they have the
capabilities to be stretched further to operate more broadly?’
Page 166

Page 167

 Document the outcomes – individually (career conversation template can be used) and
collectively (succession plan template is available).
Service Level
Succession
planning
 Identify employees who could provide temporary cover to ensure short to medium term continuity
of service delivery. This can provide a useful development or stretch opportunity.
Development
action planning
 Consider next steps, e.g. what might the next role move look like? What are the skills and
experiences this employee should develop through the move and what’s the likely timescale?
 Also think about the benefits and opportunities for broadening experience across other service
areas.
 What other support could be helpful now?
Page 167

Page 168

Key
Green Not Critical
Amber Partly Critical
Red Critical
Difficulty in Filling the Vacancy
Unique skill/knowledge - a pivotal role in the
organisation
Important role whose specific skills/knowledge might
cause a problem if left unfilled    
Important role, but competencies are shared and not at
risk    
General competencies in organisational area    
General competencies and easy to find in the market     
Low Low-
Medium Medium Medium-
High High
Impact of Vacancy on Service Delivery
Page 168

Page 169

Appendix 2 – Career Conversation Template (Template could be digitized onto an
eform)
Career Conversation
Employee name
Job & Location
Date
The discussion points and questions below are suggested prompts to help leaders
and managers prepare for a career conversation with an employee. Actions and
timescales should be documented and agreed with the employee (e.g. this could be
recorded as part of ERDP)
Suggested prompts Comments
CURRENT POSITION
1. Current role
What do you enjoy best about your current role?
What do you enjoy least about your current
role?
2. Understanding challenges
What do you perceive to be the most interesting
/ exciting challenge you face in your current
role?
Do you have external or internal challenges and
do they impact your readiness to progress?
Page 169

Page 170

ASPIRATIONS/MOBILITY
1. Where they see themselves going?
 Describe your career aspirations?
2. The timeframe for their progression
 where would you like to be professionally in the
next year, in the next 2-3 years?
 What do you need to do to accomplish this?
 What new responsibilities or challenges would
move you ahead?
3. Appetite for different career experiences
 Have you thought more broadly about your
career options (e.g., functional experience /
responsibility or role experiences or projects)?
 Do you have a clear view on your next role
move?
STRENGTHS & MOTIVATORS
1. What are they good at and what could be
improved?
Describe your strengths and weaknesses.
2. What type of work do they most enjoy and why?
 Is that your current role or a different role?
3. What drives and motivates them
 What motivates you?
 How do those motivators impact your current
role? Positively / negatively?
 What type of work do you find rewarding?
 Do you feel proud to work for Moray Council?
 Do you feel proud of your role and yourself?
DEVELOPMENT AREAS/ACTIONS
1. Actions they need to take to continue their
development / progression
 Are there any specific opportunities /
experiences you need exposure to?
2. Current development actions they are pursuing
 Are you currently involved in any continuous
professional development?
 Would a mentor be beneficial? If so, who, why
what’s the focus and objective of that
relationship?
 When do you think you might outgrow your
current role?
3. Support they require
 What growth opportunities can you pursue in
the interim?
Page 170

Page 171

 What support do you need with your
development plan?
MANAGEMENT TO COMPLETE
Readiness for progression?
What Service would the employee like to
progress in?
What role(s) would be desirable for the
employee and achievable?
Document development opportunities agreed
including timescales
(see appendix 2a for suggestions of range and type of
opportunities that can be considered)
1. Actions employee needs to take.
2. Actions leader/manager needs to take.
3. Education / qualifications /formal training
required (ensure that relevant contractual
arrangements are in place regarding the expectations
to complete the required level along with training
mandate as appropriate)
4. Other support required.
5. Resource required to support actions
If financial support is required include as part of annual
training request submission or complete a training
request form (if during the year)
Now, within a year, 2-3 years?
Signatures
Reviewee - Employee
Reviewer - Employee's
Supervisor / line manager
Reviewee and Reviewer to keep for reference and use it as a working document, a
prompt for action.
Page 171

Page 172

Appendix 2a – informal and formal development opportunities.
When considering the type of development opportunities that may be appropriate, it is worth bearing in mind the information outlined below in
terms of what is most effective. The development opportunities need to be based on individual circumstances and requirements. Whilst some
formal learning may be required, for example, if there are particular qualification and/or certification requirements, it is likely that input on an
ongoing regular basis that includes experience and exposure to a range of informal development opportunities across relevant areas, will lead
to positive outcomes in terms of the readiness of employees for the next step.
Development Opportunities
Best practice research tells us that the most effective personal development is gained on the job.
 Ideally, about 70% of employee development will come from job experiences. This is most effective when the role is challenging, support and
feedback is provided.
 A further 20% of employee development should come from exposure to others, particularly when working closely with role models, mentors
and coaches.
 The final 10% from education and formal learning such as instructor led training courses and reading.
Page 172

Page 173

Experience (70%)
Projects to offer greater breadth (e.g. key role in a
change programme)
• Stretch in role objectives (e.g. increase in people
management responsibilities)
• Cross-service/functional assignments/projects
• Challenging individual project
• Stretch assignment/project
• Involvement in projects based on relevant
function/specialist area
• Affiliations and memberships
• Increased autonomy in current role responsibilities
• Leadership of stretching project within own
specialist area
• Deploy to another role within service area
Exposure (20%)
Increased 1:1 time with line manager
• 1:1 knowledge transfer meetings with leaders or
experts from a range of service areas
• Permission to spend additional time on personal
development/ reflection activities
• Supporting cross business initiatives e.g.
Committees, working groups etc.
• Coaching
• Mentoring colleagues to transfer core expertise
• Career coaching and guidance
• Leading ideas/development sessions to improve own
area of the service with colleagues
• Shadowing of other roles in service area
Education (10%)
Training on a range of topics – a
focus on breadth of knowledge
• Leadership and people development
programmes or modules; internal provision
includes Moray Management Methods; First
Line Manager Programme and leadership
development through 3 Horizons, leading in
complexity and Action Learning Sets.
• Attendance at sector specific events
• Pursuit of professional qualifications
• Access to specific professional/trade/skillset
publications
• Attendance at functional knowledge-sharing
initiatives (e.g. sharing case studies, best
practice)
• Self-directed learning with support of
additional resources (relevant books,
Journals, desk top research etc.)
• Role/function specific qualification or
training
Page 173

Page 174

Appendix 3 – Tools to support identification of potential.
These tools help leaders and managers to consider the potential and value employees bring to their current roles, as well as what
is required to reach their full potential. It can help to identify employees who may be interested in developing to be ready for
progression, where they are at in terms of readiness and what type of development opportunities are most appropriate.
Demonstrates the expected
behaviours
and shows potential. Needs
support to further enhance.
High performer and
expert in current role, could offer
lots more by advancing.
Needs support to
achieve potential and understand
how they achieve the level that
their
role requires.
Delivers objectives, needs
support to understand how they
are accomplished/ behaviours.
Operates consistently, are vital to
continuity of service, contributions are
valued - unlikely to progress higher
W hat you accomplish and how you do it
Delivery of objectives and demonstrable behaviours
W hat you accomplish and how you do it
Delivery of objectives and demonstrable behaviours
W hat you accomplish and how you do it
Delivery of objectives and demonstrable behaviours
W hat you accomplish and how you do it
Delivery of objectives and demonstrable behaviours
Potential to do more with development
Level of capability and ambition demonstrated
Potential to do more with development
Level of capability and ambition demonstrated
Potential to do more with development
Level of capability and ambition demonstrated
Potential to do more with development
Level of capability and ambition demonstrated
New To Role
New To Role New To Role New To Role
High
T
e
a
m
p
o
t
e
n
t
i
a
l
p
r
o
f
i
l
e
f
r
a
m
e
w
o
r
k
High
T
e
a
m
p
o
t
e
n
t
i
a
l
p
r
o
f
i
l
e
f
r
a
m
e
w
o
r
k
T
e
a
m
p
o
t
e
n
t
i
a
l
p
r
o
f
i
l
e
f
r
a
m
e
w
o
r
k
High
T
e
a
m
p
o
t
e
n
t
i
a
l
p
r
o
f
i
l
e
f
r
a
m
e
w
o
r
k
High
High
Hig
h
Hig
h
Hig
h
Low
Low
Low
Low
Low
Lo
w
Lo
w
Lo
w
Moray Council
Expected
Behaviours
Moray
Council
Expected
Behaviours
Moray
Council
Expected
Behaviours
Moray
Council
Expected
Behaviours
Ready Now
Ready 1-3 Yrs.
Ready 3-5 Yrs.
Ready Now
Ready 1-3 Yrs.
Ready 3-5 Yrs.
Ready Now
Ready 1-3 Yrs.
Ready 3-5 Yrs.
Ready Now
Ready 1-3 Yrs.
Ready 3-5 Yrs.
Page 174

Page 175

Detailed
Summary
High performer and strong role
model in terms of behaviours.
Delivers with drive, shows
potential and ambition to move
on. Explore; advancing technical
expertise or accelerate leader
development and timeframes for
these
Shows potential, has the right
qualities and drive. Needs
support to build/broaden
expertise that will increase
performance contribution.
Highly motivated and needs to
broaden skillset and experience
to progress.
Core player and core to the
service, most likely happy in
current role and doesn’t want to
progress but steady, reliable and
good solid performance – there
will be lots of these individuals
and we need them.
Trusted team member in
terms of delivery but
needs support to align
behaviour. Maybe
misaligned, identify
constraints, reinforce
behaviours, role model.
Employees or promotions,
New to roles –
Targeted support to reach
potential – remedial action
should already be in place
through normal processes
(should be no surprises in
this exercise that’s not what
this is about).
Illustrative
timeframe
(yrs and
roles)
Now, 1-3yrs, 3-5yrs & review 1-3
role moves away
1-3yrs, 3-5yrs with the right
investment & review 3-4 role
moves away
Extend scope of current role or
lateral move into similar role that
plays to strengths.
Possible 3-5yrs with
investment & review
Could be 3-4 moves
away 
Remedial action required in
short to medium term.
Action
required
Development may involve 360,
mentor, secondment or stretch
role/assignment, raise profile and
exposure, have them develop and
support other staff, identify a
career path, professional leader
development programmes
Explore if this is the right role if
not, focus development on a
role better suited and help
them get there (e.g. consider
role move, project, additional
responsibilities, training,
professional dev, coach) 
Development will be about
stretch in role, or lateral move,
CPD, ongoing education to
maintain and stretch
performance, secondments to
share expertise in another area
and broaden expertise, trying
new things in current role.
Development may be
time, encouragement
and feedback, 360, on
the job mentoring,
career diagnosis is this
the right career for
them?, challenge with
clear expectations and
feedback.
Development could be
coaching, buddying, basic
knowledge and skills
training, time &
encouragement to get back
on track, challenge with
clear expectations, clear
objectives with regular
review process.
Behaviour
framework
Strengths across all cornerstones
– exceptional in some
Strengths across most – may be
exceptional in one or two and
still developing in others
On par across most cornerstones
– still developing in some
May be good across
some of the
cornerstones - gaps in
some
May demonstrate some of
the relevant behaviours -
significant gaps in some
Appendix 4: sample of succession planner template
Page 175

Page 176

Purpose of Plan: to identify roles that are critical to service delivery, analyse associated risks and create and document plans to reduce risks. Date
Plan updated by HOS/DMT:
Critical
Role Grade Team
Current
Incumbent
When
role
likely to
be
vacant
Potential
successors
Readiness of
potential
successors
(immediate,
within a year, 1-
3 years)
Emergency
cover
available
(yes/no)
Career
Conversation
held (date)
Actions agreed (list
from table)
Service
Manager 13 Y Mr X Mar-26 Mr B 1-3 yrs yes 31.1.25
Management training;
attend mgt team
meetings with current
incumbent; allocate
specific pieces of project
work to widen skills base
and contacts across
other services. Attend
Procurement Training
and 3 Horizons and
Leading in Complexity
Corporate Training
during 2025
N.B.  Whilst the information contained in the plan is important for service and workforce planning purposes and therefore should be available
across service DMTs, it may be appropriate for individual circumstances and actions agreed to be kept confidential between HoS, Line
Manager and employee.
Page 176

Page 177

Appendix 5                      Flow Chart of Steps
Manager updates
the succession
planner
Manager
schedules follow-
up career
conversation
Employee chooses
whether to commit
to a career
conversation
During ERDP
Does the employee
want progression
outside of their current
role?
Yes
Undertake a career
conversation  with
the employee
Update the
succession planner
with career
conversation details
No
Record as part of
ERDP/PRD
outcomes
Appendix 6
DEMAND
HoS & Service Managers
Identify Critical Roles (using
tools to support if required)
Ensure development actions
are taken forward (succession
plan template available to use)
SUPPLY
Undertake Career Conversations
with those employees who have
indicated a desire to progress.
(template available to support and
document outcomes)
Page 177

Page 178

Information and Guidance for Teaching Staff
Appendix for staff subject to SNCT terms and conditions
Moray Education is committed to the provision of, and support for, high quality
Continuous Professional Development and Learning. This will be available to staff at
all levels through PR&D and other means within contractual working time. Each
member of staff has both an entitlement and a responsibility to undertake
Professional Development leading to school improvement. As a valued member of
an Empowered education system, staff are encouraged to lead innovation and
improvements within their local school and/or ASG context, as well as their own
professional and personal development to give themselves a sense of
accomplishment and achievement. In addition to participating in Professional
Development activities during the 35 hour working week, all staff have a contractual
obligation to devote an additional 35 hours each year to Professional Development
as per Section 9, 9.4, of the SNCT handbook 
https://www.snct.org.uk/wiki/index.php?title=Part_2_Section_9
PR&D is the process where the development needs of all staff are identified and
agreed in relation to their own professional development, their work remit, areas of
responsibility, the Improvement Plan of their establishment and the current Moray
Education Strategic Plan. This is coupled with the important issue of each member of
staff’s personal professional career development. It should be noted that this would
apply to all staff subject to SNCT pay and conditions and that there is a legal
requirement as follows:
The national agreement ‘A Teaching Profession for the 21st Century’
https://dera.ioe.ac.uk/10785/1/0042924.pdf requires that ‘teachers shall have an
ongoing commitment to maintain their professional expertise through an agreed
programme of CPD’ and that ‘every teacher will be required to maintain an individual
CPD record’. In addition, ‘teachers will be expected to meet the full commitment of
an additional 35 hours per annum for CPD’. Headteachers have a responsibility to
‘promote the Continuing Professional Development of all staff and to ensure that all
staff have an annual review of their development needs.’
All information related to Professional review and Development is available for
Education SNCT staff on GLOW as follows:
https://glowscotland.sharepoint.com/sites/MorayCouncil/TMC/PLL/SitePages/Professional-
Learning-and-Leadership.aspx
Page 178

Page 179

Report to: Meeting Date:Corporate Committee 10 JUNE 2025
Report by: Report No:Depute Chief Executive
(Economy, Environment
and Finance)
HPS012/25/ED
Author: Emma Dawson, Asset
Management Officer
Contact
Email:
emma.dawson@moray.gov.uk
Subject: Information Report: Community Asset Transfers Annual Report
1. PURPOSE
☐ For Decision      ☒  For Information
1.1 The purpose of this report is to meet the reporting requirements of section 95 of the
Community Empowerment (Scotland) Act 2015 in relation to asset transfer requests.
1.2 This report is submitted to Committee in terms of Section III (B) 32 of the Council’s
Scheme of Administration relating to the consideration of Community Asset Transfer
(CAT) requests.
2. SUMMARY
2.1 Section 95 of the Act requires each authority to publish an asset transfer report by the
end of June each year.  This report covers the period 1 April 2024 to 31 March 2025.  
There have been no asset transfer requests received during the year and officers have
dealt with five expressions of interest.  This report provides details of the actions taken
to support communities in the making of asset transfer requests.
3. BACKGROUND AND CONTEXT
3.1 The CAT Scheme is concerned with the transfer of Council-held land and buildings to
community-controlled bodies.  Moray Council has a long history of transferring assets
to the community through transferring ownership, granting leases and entering into
management agreements.
3.2 Part 5 of the Community Empowerment (Scotland) Act 2015 (the Act) gives eligible
community-controlled bodies a right to make asset transfer requests to public
authorities.  The Act requires those authorities to assess requests transparently against
a specified list of criteria, and to agree the request unless there are reasonable
grounds for refusal.
Page 179

Page 180

3.3 There is no legal requirement that all asset transfer requests be made under the Act. 
However, in the interests of transparency and completeness, details of those requests
received outwith the Act are also included in the annual report, which is attached as
Appendix 1.
3.4 During the period 1 April 2024 to 31 March 2025 there were no asset transfer requests
received.  No validated asset transfer requests were awaiting a decision as of 31
March 2025 and there were no decisions which were the subject of a review or appeal
during the reporting period.
3.5 Officers have dealt with five Expressions of Interest (EOIs) during the reporting period,
all which remain current.  These figures exclude enquiries that had not yet progressed
to the formal EOI stage.  There is no requirement that all cases first go through the EOI
process.  Community groups are free to go straight to making an asset transfer
request.
3.6 The Council’s Community Support Unit (CSU) provides capacity building support to
community groups at all stages of the CAT process.  Officers from the CSU carry out
initial assessments of all groups submitting an EOI.  This assessment identifies if the
group has the necessary skills and experience to take on responsibility for an asset
and considers any community engagement that has been done by the group.  From
this assessment, CSU officers can work with the groups on addressing any issues.  A
re-assessment is carried out on receipt of a formal asset transfer request.
4. SUMMARY OF IMPLICATIONS
4.1 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans.
a) Links to Council Corporate Plan – Transferring assets to the community supports
and contributes to improved outcomes for communities as outlined in the following
Council Plan strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.
b) Links to Local Outcomes Improvement Plan – Transferring assets to communities
contributes to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☐ Improving wellbeing of our population.
Where a property is held on a Common Good title, the interests of the inhabitants
of the former burgh will take precedence over the Council’s Corporate Plan and the
Local Outcomes Improvement Plan (LOIP).
Where the property is held under a Public Trust, it is burdened with the trust
purposes.  Consequently, a request must be considered only in relation to these
purposes.
4.2 Policy and Legal
Page 180

Page 181

On 21 March 2017, the Policy and Resources Committee approved the following policy
statement in relation to Community Asset Transfers (para 5 of the Minute refers).
“Moray Council recognises the important role that the transfer of property assets can
play in empowering communities and strengthening their resilience.  Where
appropriate, the Council will use the transfer of assets to give more control to
communities and local people, inspire them to find local solutions to community needs,
and as a means of helping communities become more sustainable in the long term.  In
determining all asset transfer requests, the Council will have regard to the guidance
provided by the Scottish Government in relation to asset transfer requests made under
Part 5 of the Community Empowerment (Scotland) Act 2015, whether or not such
requests are made under the provisions contained in the Act.”
When assets are transferred at less than market value, the disposals must comply with
the Disposal of Land by Local Authorities (Scotland) Regulations 2010.  These
regulations require the Council to be satisfied that the transfer is reasonable and that
the disposal is likely to contribute to at least one of the following purposes:
a) Economic Development,
b) Regeneration,
c) Public Health,
d) Social Wellbeing, or
e) Environmental Wellbeing.
Reasonableness in this context is taken to imply that the requested discount is the
minimum necessary to allow the project to proceed and that it is proportionate to the
costs and benefits of the project.
The Community Empowerment (Scotland) Act 2015 only applies to the Council when
acting in its capacity as a local authority.  Where the Council Members act as Trustees
under a Public Trust, they are not acting in the capacity of a local authority but in their
capacity as Trustees under and in terms of the Trust.  Consequently, the Act confers no
rights on community-controlled bodies in relation to Public Trust assets.
The Subsidy Control Act 2022 came into effect on 4 January 2023, replacing the
previous State Aid provisions.  The Act can apply whenever the Council sells or leases
a property at less than market value, provided that the conditions for a subsidy are met.
In particular, the beneficiary must constitute an ‘enterprise’ due to its activities involving
the offering of goods or services.  Section 7(2) of the Act provides that an activity is not
to be regarded as an economic activity if or to the extent that it is carried out for a
purpose that is not economic.  If the activity is not for economic purposes, then the
body will not be considered an enterprise and any financial assistance provided would
not be considered a subsidy under the Act.
4.3 Financial
There are no financial implications arising directly from this report.
4.4 Risk
There are no risk implications arising directly from this report.
4.5 Staffing
There are no staffing implications arising directly from this report.
4.6 Best Value and Transformation
Page 181

Page 182

There are no proposals relating to best value or transformation arising directly from this
report.
4.7 Property
There are no property implications arising directly from this report.
4.8 Information Communications/Technology/Digital
There are no ICT improvements required or issues arising directly from this report.
4.9 Equalities, Social Inclusion and Economic Impact
An equalities/socio-economic impact assessment is not required.  It should however be
noted that voluntary community groups or private sector organisations may also be
subject to the public sector equality duty (PSED) under the Equality Act 2010 if they
meet certain criteria including:
 they receive public funding;
 are contracted by public bodies to deliver services;
 are acting in the public interest;
 are providing a public service.
4.10 Climate Change and Biodiversity Impacts
There are no climate change or biodiversity implications arising from this report.
5. CONSULTATION
5.1 This report has been prepared in consultation with The Depute Chief Executive
(Economy, Environment and Finance), Head of Housing and Property Services, Chief
Financial Officer, Human Resources Manager, Communities Service Manager, Property
Asset Manager, Legal Services Manager, S. Souter Senior Accountant, Community
Learning and Engagement Manager, Democratic Services Manager, and Equal
Opportunities Officer and any comments made have been incorporated into the report.
6. BACKGROUND PAPERS
6.1 Held by author.
Page 182

Page 183

APPENDIX 1
Community Asset Transfer
Annual Report: 1 April 2024 to 31 March 2025
Page 183

Page 184

CAT Annual Report 2024 | 2
Page 184

Page 185

CAT Annual Report 2024 | 3
Contents
Introduction 4
Promotion and support 4
Asset transfer requests 6
Simplified arrangements 7
Contact Us 7
Appendix 1 8
Appendix 2 10
Completed by: Emma Dawson
Role: Asset Management Officer
Date of completion: 04/04/2025
Page 185

Page 186

CAT Annual Report 2024 | 4
Introduction
From 23 January 2017 the Community Empowerment (Scotland) Act 2015 (the Act) gave eligible
community bodies a right to make asset transfer requests to public authorities. A request can be made
in respect of any land or building that is owned or leased by the relevant authority. The Act requires
public authorities to agree to the request unless there are reasonable grounds for refusal.
Section 95 of the Act requires each authority to publish a report annually covering the number of
asset transfer requests processed through the year together with details of what actions it has taken
to promote the use of asset transfer requests and to support community bodies through the process.
There is no requirement that all asset transfer requests be made under the Act. In the interests of
transparency and completeness, details of requests dealt with outside of the Act are included in this
report.
Promotion and support
The following actions have continued to promote and support the Community Asset Transfer process
during the period 1 April 2024 to 31 March 2025.
Empowering communities
Community empowerment refers to the process of enabling communities to increase control over
their own lives. Communities are groups of people who share common interests, concerns or
identities. Empowerment refers to the process by which people gain control over the factors and
decisions that shape their lives.
Moray Council has long recognised the important role that the transfer of property assets can play
in empowering communities and strengthening their resilience. The Council’s Community Asset
Transfer (CAT) Scheme supports its Corporate Plan priority of building thriving, resilient and
empowered communities and the Local Outcomes Improvement Plan priority of empowering and
connecting communities. Where appropriate, the Council will use the transfer of assets to give
more control to communities, helping to inspire them to find local solutions to community needs
and become more sustainable in the long term.
Findochty Town Hall
Page 186

Page 187

CAT Annual Report 2024 | 5
Dufftown Community
Centre
Supporting communities
The Council’s Community Support Unit (CSU) provides capacity building support to all community
groups throughout the CAT process. Officers from the CSU carry out initial assessments of groups
submitting an expression of interest. This assessment identifies if the group has the skills and
experience necessary to take on an asset and considers any community engagement that has been
done by the group. From this, CSU officers can work with the groups on addressing any issues that
come to light, e.g. governance, consultation, business planning, etc. The same level of support is
available to those taking advantage of the simplified arrangements covered by the CAT scheme.
Officers from the CSU encourage groups to consider the requirements of those most in need in their
community. The CSU will work with the Council’s Research and Information Officers to provide
relevant data and statistical information to help groups understand the demographics and needs of
their communities. They also work with other partners who can provide support to groups – notably
the Development Trusts Association Scotland’s Community Ownership Support Service (COSS)
and Highlands and Islands Enterprise (HIE). HIE have provided funding for community groups to
commission options appraisals and a Social Return on Investment report in support of potential
CATs.
Continuous action
The Councils dedicated Community Asset Transfer Team continue to deal with Asset Transfer
enquiries.
The Council’s website has a Community Asset Transfer section which includes guidance on the CAT
process, forms, details of successful Community Asset Transfers within Moray and provides useful
links to Scottish Government guidance, legislation and other related information. There is also a
dedicated mailbox for Asset Transfer enquiries.
Communities can also find out more about the Council’s land and building assets from its map-
based Asset Register. The full register is available to search or download through the Council’s Open
Mapping Data Portal.
Open Mapping Data Portal
https://data-moray.opendata.arcgis.com/
Page 187

Page 188

CAT Annual Report 2024 | 6
Asset transfer requests
This report covers the period 1 April 2024 to 31 March 2025. During this time there were no asset
transfer requests received. No validated asset transfer requests were awaiting a decision and there
were no decisions which were the subject of a review or appeal during the reporting period.
Previously successful asset transfers completed since the introduction of the Act in January 2017
are shown in Appendix 1. The Council is currently in the process of transferring one more asset and a
decision relating to one further request has been deferred while an alternative site is investigated as
shown in Appendix 2.
Approved Transfers
Lossiemouth’s Coulardbank Playing Fields are held by the Council on an inalienable Common
Good title. In January 2020, the Lossiemouth Community Development Trust submitted an asset
transfer request for a 25-year lease of a site within the playing fields for the purpose of developing a
skate park. In October that year, the Council agreed to the requested lease subject to the courts
granting consent and to the Trust obtaining the necessary planning consent for the development.
Decree was granted by the court on 12 January 2021 and planning consent was granted on 21
March 2024 allowing the proposed lease of the site to proceed. The lease is now in the process of
being completed.
Keith’s Longmore Hall is held by the Council as part of the Longmore Trust. In 2018, the Council
took the decision to seek a community group to take over responsibility for the day-to-day running
of the hall. In response to that decision, the community established Longmore Community Hall as
a Scottish Charitable Incorporated Organisation (SCIO) for the purpose of running the hall. The
SCIO has occupied the hall under a short-term lease since July 2018. The community body’s
application for longer term lease was approved by the Council in November 2023. The new lease
is now in the process of being completed.
Expressions of Interest
The Council’s CAT Scheme involves a two-stage process. Community bodies are encouraged to take
advantage of the pre-application stage by completing an Expression of Interest (EOI) for any land or
buildings in which they have an interest. On receipt of an EOI, the Council’s CAT Team will:
 check the community body’s eligibility under the scheme,
 check that the Council has the ability to transfer the relevant property rights,
 identify the Council’s current and future operational requirements for the property,
 identify as far as possible any other material considerations that should be taken into account in
determining an asset transfer request for the property, and
 exchange information related to the community body, the asset, and the potential transfer.
The EOI stage is designed to help the community body avoid abortive work and prepare a robust
business case in support of its asset transfer request. Not all community bodies that submit an EOI will
progress to making a formal asset transfer request and some will choose to go straight to making a
formal request without first submitting an EOI. The Council has dealt with five EOIs during the period
covered by this report, all of which remain current.
Page 188

Page 189

CAT Annual Report 2024 | 7
Simplified arrangements
The Council’s former Community Rental Grant Scheme was brought within the purview of its CAT
Scheme. The extended scheme provides an opportunity to all existing voluntary and community
organisations that lease property from the Council to apply for a Community Rent Rebate whenever
their rent falls due to be reviewed. This element of the scheme is not covered by the Community
Empowerment legislation and all applications are considered entirely at the Council’s discretion.
Applications must be supported by a robust business case demonstrating ongoing benefits
commensurate with the rebate being applied for.
The community response to the pandemic led to an increase in requests from voluntary and
community organisations seeking short term arrangements for the use of temporarily unoccupied
Council assets. Given the nature of such requests, a swift turnaround is often necessary and
adherence to committee timescales does not facilitate an agile response. Recognising that the level
of justification should be proportionate to the nature of the request, a simplified process is now
available to organisations seeking a short term or low value concessionary lease.
Contact Us
Further information on the scheme is available from
the Council’s CAT team or its Community Support Unit
(CSU).
by post:
Moray Council, High Street, Elgin IV30 1BX
by phone:
01343
543451
by email:
CAT@moray.gov.uk or CSU@moray.gov.uk
on the web:    
http://www.moray.govuk/CAT
Page 189

Page 190

CAT Annual Report 2024 | 8
Appendices
Appendix 1
The following assets were transferred prior to the current reporting year but after Part 5 of the
Community Empowerment (Scotland) Act 2015 came into force on 23 January 2017. No asset
transfers were completed between 23 January 2017 and 31 March 2017.
Table 1. Asset transfers completed from 1 April 2023 to 31 March 2024
Property Community Body Type 2015 Act Transferred
Fishermen’s Hall, Buckie Fishermen’s Hall Trust Ownership Yes 19/05/2023
Table 2. Asset transfers completed from 1 April 2022 to 31 March 2023
Property Community Body Type 2015 Act Transferred
Findochty Town Hall Findochty Town Hall
(SCIO)
Ownership Yes 21/07/2022
West Dunes Toilets, Findhorn Findhorn Village
Conservation Company
Ownership Yes 12/10/2022
Garmouth Water Tower Garmouth and Kingston
Community Association
Ownership No 19/12/2022
Table 3. Asset transfers completed from 1 April 2021 to 31 March 2022
Property Community Body Type 2015 Act Transferred
Cullen Community and
Residential Centre
Three Kings Cullen
Association
Ownership Yes 05/11/2021
Table 4. Asset transfers completed from 1 April 2020 to 31 March 2021
Property Community Body Type 2015 Act Transferred
Dufftown Sports and Community
Centre
Dufftown Community
Centre (SCIO)
Ownership No 05/03/2021
Forres Town Hall Forres Area Community
Trust
Ownership Yes 26/02/2021
Land, Lesser Borough Briggs,
Elgin
Elgin Sports Community
Trust
Lease Yes 23/11/2020
Page 190

Page 191

CAT Annual Report 2024 | 9
Table 5. Asset transfers completed from 1 April 2019 to 31 March 2020
Property Community Body Type 2015 Act Transferred
Portknockie Bowling Green Portknockie Bowling
and Tennis Club
Ownership No 08/11/2019
Marine Park, Lossiemouth Action Marine Park Ownership No 05/06/2019
Table 6. Asset transfers completed from 1 April 2018 to 31 March 2019
Property Community Body Type 2015 Act Transferred
Cabrach School and Community
Hall
Cabrach Trust Ownership No 24/10/2018
Abbeylands School, Kinloss Morayvia Ownership No 05/10/2018
Table 7. Asset transfers completed from 1 April 2017 to 31 March 2018
Property Community Body Type 2015 Act Transferred
Tomintoul Bowling Green Tomintoul and Glenlivet
Bowling Club
Ownership No 25/05/2017
Tomintoul Youth Hostel Tomintoul and Glenlivet
Development Trust
Ownership No 19/04/2017
Tomintoul Museum Tomintoul and Glenlivet
Development Trust
Ownership No 19/04/2017
Page 191

Page 192

CAT Annual Report 2024 |
10
Appendix 2
The following assets are awaiting completion or are currently deferred pending a Council
decision.
Table 1. Approved Asset Transfer Requests Awaiting Completion
Property Community Body Request 2015 Act Approved
Land, Coulardbank Park,
Lossiemouth
Lossiemouth Community Development
Trust
Lease Yes 06/10/2020
Longmore Hall, Keith Longmore Community Hall (SCIO) Lease No 07/11/2023
Table 2. Deferred Asset Transfer Requests
Property Community Body Request 2015 Act Deferred
Land, Grant Park, Forres Forres Skate Park Initiative Lease No 27/09/2023
Page 192

Page 193

Page 193

Page 194

Page 194

Page 195

Report to: Meeting Date:Corporate Committee 10 JUNE 2025
Report by: Report No:Depute Chief Executive
(Economy, Environment
and Finance)
HPS013/25/ED
Author: Emma Dawson, Asset
Management Officer
Contact
Email:
emma.dawson@moray.gov.uk
Subject: Information Report:  Community Rental Support Annual Review
1. PURPOSE
☐ For Decision      ☒  For Information
1.1 The purpose of this report is to provide information on the level of rental support
awarded to voluntary and community organisations (VCOs) occupying Council
property.
1.2 This report is submitted to the Corporate Committee in terms of Sections III (B) (20)
and III (B) (30) of the Council’s Scheme of Administration relating to the
management of Common Good and Trust property and to the monitoring and review
of concessionary rents respectively.
2. SUMMARY
2.1 The Council has established appropriate arrangements for assessing new requests
from VCOs for leases at concessionary rentals, however, there remains a legacy of
agreements entered into prior to these arrangements coming into force.  Some
agreements involved setting a nominal rent that subsists until the end of the lease. 
Others can be reviewed at regular intervals.  This report sets out the level of rental
support provided under these arrangements together with support approved under
delegated powers.
3. BACKGROUND AND CONTEXT
3.1 On 1 September 2015, the Policy and Resources Committee agreed that rental
support provided to VCOs occupying Council property be monitored by means of an
annual report (para 8 of the Minute refers).  On 25 May 2016, the Council agreed
that all new requests from VCOs for leases at less than market value would be
considered under the Community Asset Transfer (CAT) scheme (para 22 of the
Minute refers).  New lease applications dealt with under the CAT scheme are
covered in a separate annual report.
Page 195

Page 196

3.2 Leases where the property has no commercial value, where the rent payable has
been reduced to reflect an agreement that the tenant will undertake improvement
works to the property, or where the Council’s ability to charge a rent is restricted, do
not involve the provision of discretionary rental support.  Such leases are outwith the
scope of this report.
3.3 Legacy Arrangements
Appendix 1 lists those leases where the property is considered to have a
commercial value and where nominal rentals result from the provision of
discretionary rental support.  In most of these leases, there is no provision to review
the rent payable during the lease term.  When they come to an end the tenant can
negotiate a new lease on commercial terms or apply under the CAT Scheme for a
new lease at less than market value.
3.4 Community Rent Rebates
From 23 March 2005, the Council changed the way it handled requests for rental
support from VCOs.  Instead of agreeing a nominal rent, the rent payable was set at
a commercial rate and the VCO could apply for a discretionary limited life rental
grant or rent rebate.  Under these arrangements, the rebate ceases whenever the
rent is due to be reviewed.  The VCO can then apply for a continuation of the rent
rebate.  When the lease comes to an end the tenant can negotiate a new lease on
commercial terms or apply under the CAT Scheme for a new lease at less than
market value.
3.5 Appendix 2 lists those leases where the tenant currently benefits from a rent rebate.
As each lease comes to an end, any request for a new lease with rental support
would be considered under the CAT scheme.  The total rental support provided
under these arrangements for the 2024/25 financial year amounted to £25,390.  This
comprised £7,590 relating to the general fund, £11,400 relating to common good,
and £6,400 relating to public trusts.
3.6 Short-Term Low-Value Rental Concessions
On 12 May 2021, the Council delegated authority to the Chief Financial Officer to
approve applications for short-term low-value concessionary arrangements to
facilitate a light touch process and enable a quick response (para 16 of the Minute
refers).  When the value of the rebate reaches the delegated limits, any further
application must be brought to committee for determination.
3.7 Appendix 3 lists those leases where the tenant enjoys a rent rebate approved under
delegated authority.  No applications for short-term low-value rental support were
received during the 2024/25 financial year.
4. SUMMARY OF IMPLICATIONS
1.
4.1 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through
Best Value, will better enable the Council to fulfil the ambitions set out in its
strategic plans.
a) Links to Council Corporate Plan – Leasing assets to the community at less than
market value can support and contribute to improved outcomes for communities
as outlined in the following Council Plan strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
Page 196

Page 197

☒ Build Thriving, resilient, empowered Communities.
b) Links to Local Outcomes Improvement Plan – Leasing assets to the community
at less than market value can support and contribute to improved outcomes for
communities as outlined in the following Local Outcomes Improvement Plan
priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☐ Improving wellbeing of our population
Where a property is held on a Common Good title, the interests of the
inhabitants of the former burgh will take precedence over the Council’s
Corporate Plan and the Local Outcomes Improvement Plan (LOIP).
Where the property is held under a Public Trust, it is burdened with the trust
purposes.  Consequently, any application for financial support must be
considered only in relation to these purposes.
4.2 Policy and Legal
On 21 March 2017, the Policy and Resources Committee approved the following
policy statement in relation to Community Asset Transfers (para 5 of the Minute
refers).
“Moray Council recognises the important role that the transfer of property assets can
play in empowering communities and strengthening their resilience.  Where
appropriate, the Council will use the transfer of assets to give more control to
communities and local people, inspire them to find local solutions to community
needs, and as a means of helping communities become more sustainable in the long
term.  In determining all asset transfer requests, the Council will have regard to the
guidance provided by the Scottish Government in relation to asset transfer requests
made under Part 5 of the Community Empowerment (Scotland) Act 2015, whether or
not such requests are made under the provisions contained in the Act.”
When assets are leased at less than market value, the arrangement must comply
with the Disposal of Land by Local Authorities (Scotland) Regulations 2010.  These
regulations require the Council to be satisfied that the arrangement is reasonable
and that it is likely to contribute to at least one of the following purposes:
a) Economic Development,
b) Regeneration,
c) Public Health,
d) Social Wellbeing, or
e) Environmental Wellbeing.
Reasonableness in this context is taken to imply that the requested discount is the
minimum necessary to allow the projected benefits to be realised and that it is
proportionate to the costs and benefits.
In administering Common Good assets, the Council is required by section 15(4) of
the Local Government etc. (Scotland) Act 1994 to have regard to the interests of the
inhabitants of the area to which the Common Good related prior to 16 May 1975.
Where the Council Members act as Trustees under a Public Trust, they are not
acting in the capacity of a local authority but in their capacity as Trustees under and
in terms of the Trust.
Page 197

Page 198

The Subsidy Control Act 2022 came into effect on 4 January 2023, replacing the
previous State Aid provisions.  The Act can apply whenever the Council sells or
leases a property at less than market value, provided that the conditions for a
subsidy are met.  In particular, the beneficiary must constitute an ‘enterprise’ due to
its activities involving the offering of goods or services.  Section 7(2) of the Act
provides that an activity is not to be regarded as an economic activity if or to the
extent that it is carried out for a purpose that is not economic.  If the activity is not for
economic purposes, then the body will not be considered an enterprise and any
financial assistance provided would not be considered a subsidy under the Act.
4.3 Financial
There are no financial implications arising directly from this report.
4.4 Risk
There are no risk implications arising directly from this report.
4.5 Staffing
There are no staffing implications arising directly from this report.
4.6 Best Value and Transformation
There are no proposals relating to best value or transformation arising directly from
this report.
4.7 Property
There are no property implications arising directly from this report.
4.8 Information Communications/Technology/Digital
There are no ICT improvements required or issues arising directly from this report.
4.9 Equalities, Social Inclusion and Economic Impact
An equalities/socio-economic impact assessment is not required.
4.10 Climate Change and Biodiversity Impacts
There are no climate change or biodiversity implications arising from this report.
5. CONSULTATION
5.1 This report has been prepared in consultation with The Depute Chief Executive
(Economy, Environment and Finance), Head of Housing and Property Services, Chief
Financial Officer, Communities Service Manager, Property Asset Manager, Legal
Services Manager, Human Resources Manager, S. Souter, Senior Accountant,
Community Learning and Engagement Manager, Democratic Services Manager and
Equal Opportunities Officer and any comments made have been incorporated into the
report.
6. BACKGROUND PAPERS
6.1 Held by author.
Page 198

Page 199

APPENDIX 1
Legacy Arrangements – Properties Let at Nominal Rents Reflecting the Award of Financial Support as at 31 March 2025
Financial support can be provided through the Council retaining responsibility for specified property costs, agreeing to forego rent
that it could otherwise charge, or a combination of both.  The table below only includes cases involving the provision of financial
support.  Most leases involve the tenant taking on full responsibility for all property costs, including repairs and maintenance – these
lease types are designated by the letters FRI (full repairing and insuring).  In some cases, the tenant is responsible for internal
repairs only – these are denoted by the letters IRO.  Where properties were let at nominal rents a new valuation would be required
to identify the current value of the rental concession.  The majority of these leases contain no provision for reviewing the rent, so
can only be reviewed when the lease is terminated.  The list is grouped by title, i.e. General Fund, Common Good and Public Trust
and then sorted by expiry date with the earliest dates at the top.
Location Community Body Property Lease
Type
Date of
Entry
Term Expiry Annual
Rent
Next
Review
General Fund
1
.
Forres Forres Thistle FC Logie Park,
Pilmuir Road
FRI 01/06/1988 50
years
01/06/2038 £10.00 Lease end
2
.
Mosstodloch Mosstodloch
Amenities
Association
Site of Speymouth
Hall,
Stynie Road
FRI 15/03/1977 99
Years
14/03/2076 £0.01 Lease end
3
.
Lhanbryde Lhanbryde
Community
Challenge
Site of Village Hall,
Robertson Road
FRI 11/11/1977 99
years
11/11/2076 £0.01 Lease end
4
.
Portgordon Portgordon
Recreation
Committee
Bowling Green,
Station Road
FRI 01/09/1978 99
years
01/09/2077 £0.01 Lease end
5
.
Fochabers Fochabers Rifle
Club
13 Christie Place FRI 28/05/2006 99
years
28/05/2105 £1.00 Lease end
Common Good
Page 199

Page 200

Location Community Body Property Lease
Type
Date of
Entry
Term Expiry Annual
Rent
Next
Review
6
.
Buckie Buckie Victoria
Bowling Club
Bowling Club,
West Church Street
FRI 01/04/2005 25
years
31/03/2030 £1.00 Lease end
7
.
Forres Forres Bowling Club Forres Bowling
Club,
St. Catherines Road
FRI 07/07/1995 99
years
06/07/2094 £1.00 Lease end
Public Trust
8
.
Aberlour Aberlour
Community
Association (Note 1)
Fleming Hall,
Queens Road
IRO 01/04/2001 25
years
31/03/2026 £1.00 01/04/2026
or lease
end
Notes
1. The Fleming Hall trust has no funds.  The Council is currently responsible for keeping the hall wind and watertight, resulting in a
net cost to the Council.  The rent payable for the hall was initially set at £1 (if asked) but with a provision for quinquennial rent
reviews.  The rent review clause contains provision for determining whether the rental concession should continue.  The tenant
has benefited from this provision throughout the tenancy with the result that there is no income generated by the lease.  The
trust deed does not permit the trustees to retain any surplus income from the property.  When the lease is due to be renewed it
will be offered on FRI terms and conditions.
Page 200

Page 201

APPENDIX 2
Community Rent Rebates as at 31 March 2025
Most of the leases listed involve the tenant being fully responsibility for all property costs, including repairs and maintenance.  The
list is grouped by title, i.e. general fund, common good and public trusts, and sorted by earliest rent review date.
Location Community
Body
Property Date of
Entry
Expiry Date Annual
Rent
Rebate
Awarded
Rent
Payable
Review
Cycle
Next
Rent
Review
Date
General Fund
1. Keith 2nd Keith Scout
Group
Old Ogilvie
School,
Fife Street
31/10/2015 30/10/2035 £5,790 £5,790 £0 5 Years 31/10/20
25
2. Findochty Findochty
Bowling Club
Findochty
Bowling Green
18/05/2006 17/05/2031 £400 £400 £0 5 Years 18/05/20
26
3. Buckie Buckie Skate
Park
Committee
Skate Park,
Ian Johnston
Park
27/09/2008 26/09/2028 £1,400 £1,400 £0 5 Years 27/09/20
28
(lease
end)
Total Values for General Services £7,590 £7,590 £0
Common Good
4. Buckie Fishing
Heritage
Centre (note 1)
Fishing Heritage
Centre
01/03/2006 28/02/2036 £2,700 £2,700 £0 3 Years 15/05/20
27
5. Forres Transition
Town Forres
(note 2)
Bogton Road 31/03/2009 31/03/2041 £13,200 £8,700 £4,500 3 years 31/03/20
26
Total Values for Common Good £15,900 £11,400 £4,500
Public Trusts
Page 201

Page 202

Location Community
Body
Property Date of
Entry
Expiry Date Annual
Rent
Rebate
Awarded
Rent
Payable
Review
Cycle
Next
Rent
Review
Date
6. Forres Grant Park
Pavilion
Committee
Bowling
Pavilion, Grant
Park
03/11/2008 02/11/2048 £6,300 £6,300 £0 3 Years 03/11/202
6
7. Elgin Bowling Club
(note 3)
Bowling
Pavilion, Cooper
Park
01/04/2008 31/03/2028 £100 £100 £0 None 01/04/20
28
(lease
end)
Total Values for Public Trusts £6,400 £6,400 £0
All Ownership Categories
Total Values for all ownership categories £29,890 £25,390 £4,500
Notes.
1. On 23 April 2024, the Corporate Committee agreed to renew the 100% community rent rebate for a further period of 3 years to
15 May 2027 (paragraph 16 of the draft Minute refers).
2. On 23 April 2024, the Corporate Committee agreed to award Transition Town Forres a Community Rent Rebate of £8,700 per
annum backdated to 31 March 2023 (paragraph 14 of the draft Minute refers).
3. The Council is liable for maintaining the Bowling pavilion roof but has the option to terminate the lease if it becomes uneconomic
to repair.
Page 202

Page 203

APPENDIX 3
Concessionary Rentals of Low Value or Short Duration Approved under Scheme of Delegation as at 31 March 2025
The default position where rent rebates are awarded under delegated powers is that the tenant must accept full responsibility for all
property costs, including all repairs and maintenance of the property concerned.  These are indicated by the letters FRI.
Location Community Body Property Leas
e
Type
Date of
Entry
Term Expiry Rental
Value
Rebate
Value
General Fund
9
.
Burghead Burghead and
Cummingston
Community Council
(note 1)
Site of Community
Shelter, Burghead
Harbour
FRI 14/03/2008 20
years
13/03/2028 £175 pa £175 pa
Notes
2. The rent rebate awarded to the Community Council took effect from 14 March 2021.
Page 203

Page 204

Page 204