Audit and Scrutiny Committee 
Tuesday, 27 June 2023 
NOTICE IS HEREBY GIVEN that a Meeting of the Audit and Scrutiny Committee
is to be held at Council Chambers, Council Office, High Street, Elgin, IV30 1BX
on Tuesday, 27 June 2023 at 09:30. 
BUSINESS 
1. Sederunt 
2. Declaration of Group Decisions and Members Interests * 
3. Minute of the meeting held 10 May 2023 5 - 8
4. Written Questions ** 
5. Annual Governance Statement
Report by Chief Executive
9 - 24
6. Internal Audit Annual Report- 2022-23
Report by Audit and Risk Manager
25 - 36
7. Internal Audit Section Completed Projects Report
Report by Audit and Risk Manager
37 - 68
8. Question Time ***
Consider any oral question on matters delegated to the Committee in
terms of the Council's Scheme of Administration. 
Page 1

Page 2

Summary of Audit and Scrutiny Committee functions:
Audit Functions - Consider reports from the Council's internal auditor
& Audit Scotland concerning Council Functions.
Scrutiny Functions - Scrutinising the policies of the Council and their
effectiveness in meeting the action plans of the Council as set out in
the Corporate Development Plan and evaluating the actions of
Committees in implementing the action plans set out in the Corporate
Development Plan.
Performance Monitoring - To receive reports on the performance of
and trends within all of the Council’s services in terms of service
standards and performance information.
Standards - To ensure that the highest standards of probity and public
accountability are demonstrated.     
Page 2

Page 3

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how
the individual or members of the group will vote on any item(s) of business on
the Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any
relevant and competent business within the specified remits not already on the
agenda, to the Chair provided it is received by the Proper Officer or Committee
Services by 12 noon two working days prior to the day of the meeting.  A copy
of any written answer provided by the Chair will be tabled at the start of the
relevant section of the meeting.  The Member who has put the question may,
after the answer has been given, ask one supplementary question directly
related to the subject matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the
consent of the Chair. If a Member does not have the opportunity to put a
supplementary question because no time remains, then he or she can submit it
in writing to the Proper Officer who will arrange for a written answer to be
provided within 7 working days. 
*** Question Time - At each ordinary meeting of the Committee ten minutes will be
allowed for Members questions when any Member of the Committee can put a
question to the Chair on any business within the remit of that Section of the
Committee.  The Member who has put the question may, after the answer has
been given, ask one supplementary question directly related to the subject
matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than ten minutes
after the Committee has started on the relevant item of business, except with
the consent of the Chair.  If a Member does not have the opportunity to put a
supplementary question because no time remains, then he/she can submit it in
writing to the proper officer who will arrange for a written answer to be provided
within seven working days. 
Page 3

Page 4

MORAY COUNCIL 
Audit and Scrutiny Committee 
SEDERUNT 
Councillor Graham Leadbitter  (Chair)
Councillor Shona Morrison  (Depute Chair)  
Councillor Peter Bloomfield  (Member)
Councillor Theresa Coull  (Member)
Councillor John Cowe  (Member)
Councillor John Divers  (Member)
Councillor Amber Dunbar  (Member)
Councillor Jérémie Fernandes  (Member)
Councillor Donald Gatt  (Member)
Councillor David Gordon  (Member)
Councillor Sandy Keith  (Member)
Councillor Marc Macrae  (Member)
Councillor Neil McLennan  (Member)
Councillor John Stuart  (Member)  
Mr Ivan Augustus  (Non-Voting Member)
Ms Margaret Wilson  (Non-Voting Member)
Clerk Name: Lindsey Robinson
Clerk Telephone: 07966 120593
Clerk Email: committee.services@moray.gov.uk 
Page 4

Page 5

MORAY COUNCIL 
Minute of Meeting of the Audit and Scrutiny Committee 
Wednesday, 10 May 2023 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor Peter Bloomfield, Councillor Theresa Coull, Councillor John Cowe,
Councillor John Divers, Councillor Amber Dunbar, Councillor Jérémie Fernandes,
Councillor Donald Gatt, Councillor David Gordon, Councillor Sandy Keith, Councillor
Graham Leadbitter, Councillor Marc Macrae, Councillor Neil McLennan, Councillor
Shona Morrison, Councillor John Stuart, Ms Margaret Wilson 
APPOLOGIES 
An apology was intimated on behalf of Mr Ivan Augustus. 
IN ATTENDANCE 
Also in attendance at the above meeting were the Chief Executive, Depute Chief
Executive (Education, Communities and Organisational Development), Head of
Governance, Strategy and Performance, Chief Financial Officer, Chief Officer
(Health and Social Care Moray) Head of Environmental and Commercial Services,
Head of Housing and Property Services, Audit and Risk Manager, Angela Pieri,
Public Sector Audit Director (Scotland) and Lindsey Robinson, Committee Services
Officer as clerk to the meeting. 
Councillors, Mustard, Robertson and Ross were in attendance for item 6 "Internal
Audit Section Completed Projects".  Councillor Colyer was in attendance for the
entire meeting. 
1.         Chair 
Councillor Leadbitter, as Chair of the Audit and Scrutiny Committee, chaired the
meeting. 
2.         Welcome 
The Committee joined the Chair in welcoming Margaret Wilson to her first meeting
since joining the Committee as an external member.  The second external member
is Ivan Augustus, who had given his apologies. 
3.         Declaration of Group Decisions and Members Interests * 
In terms of Standing Order 21 and the Councillors’ Code of Conduct, the Committee
noted the following declarations: - 
On behalf of the Administration, Councillor Gatt declared that there had been group
discussions on all of the Agenda items but there was no whip. 
Item 3.
Page 5

Page 6

Councillors Morrison, Divers, Gatt and Bloomfield all declared that they were either
members or substitute members of the Moray Integration Joint Board. 
Councillor Stuart declared that he works for the Care Inspectorate but does not
inspect Moray. 
There were no further declarations from Group Leaders or Spokespersons in regard
to any prior decisions taken on how Members will vote on any item on the agenda or
any declarations of Member’s interests in respect of any item on the agenda. 
4.         Minute of the Meeting of the Audit and Scrutiny Committee of 15
February 2023 
The minute of the meeting of the Audit and Scrutiny Committee dated 15 February
2023 was submitted and approved. 
5.         Written Questions ** 
The Committee noted that no written questions had been submitted. 
6.         Internal Audit Section Completed Projects 
A report by the Audit and Risk Manager advised the Committee of the work of the
Internal Audit Section for the period 16 February 2023 to 10 May 2023. 
Councillor Cowe joined the meeting during the discussion of this item. 
During consideration of the report, Councillor Ross provided a statement to the
Committee in respect of Appendix 4 – “Aberlour Early Years Learning and Childcare
Scheme” of this report, to highlight his concerns and those of his constituents. 
Councillor Fernandes sought clarification on the future use of the temporary
classrooms and questioned whether the decision should be made by Officers or by
the Education, Children’s and Leisure Services (ECLS) Committee. 
In response the Depute Chief Executive (Education, Communities and
Organisational Development) advised that there were a number of options under
consideration for the temporary classrooms and confirmed that she would be happy
to bring a report to the ECLS Committee but due to the content the report it may
need to be considered in the confidential session. 
Councillor Gatt suggested that Appendix 4 be considered by Moray Council going
forward to ensure accountability for public money. 
Councillor Robertson was also of the opinion that it be heard at Moray Council to
allow all 26 members the opportunity to consider the findings of the report. 
In response the Chair advised that it was not the remit of the Audit and Scrutiny
Committee and by considering the report at a meeting of the Council it would
undermine the role of the Audit and Scrutiny Committee.  He was also of the opinion
that there were other mechanisms available to Elected Members to raise any issues
with the Corporate Management Team (CMT). 
Councillor Gatt asked that the report be moved to a confidential session to allow
free discussion. 
Page 6

Page 7

In response the Monitoring Officer sought clarification as to the reasons for
confidentiality from Councillor Gatt, as the report was already in the public domain. 
Councillor Gatt expressed concern that a large sum of money had been spent
without the Chief Financial Officer's knowledge and the Councillors Code of
Conduct does not allow for a critical discussion about Officers to be in the open
session. 
The Chair reminded the Committee that this Committee’s remit was to scrutinise the
process and to seek assurances that the risks be minimised going forward and that
any issues Elected Members have with Officers should be raised with the Chief
Executive. 
The Chief Executive confirmed that he had not be approached by any Elected
Member with regards to any issues concerning staff.  He further added that the
report provided the Committee with the information which had been sought.  He
further advised that senior management welcomed the audit and that the deadline
for the high priority issues to be addressed was June 2023. 
The Audit and Risk Manager confirmed that following the June 2023 deadline the
audit team would revisit the service to ensure compliance against the
recommendations and would then present an update report to a future meeting of
this Committee. 
Following further consideration, Councillor Gatt moved an amendment that
Appendix 4 should be heard at the meeting of Moray Council on 28 June 2023 as a
matter of urgency as he felt that a decision was needed on the use of the temporary
cabins. 
Following a short adjournment and legal advice from the Monitoring Officer, the
Chair declared that the amendment moved by Councillor Gatt was not competent
due to it being out with the purpose of the report and would undermine the Audit and
Scrutiny Committee.  He was further of the opinion that discussion was needed
between the Administration Group and CMT with regards to agenda setting for a
special or ordinary meeting of Moray Council and that, ideally, this should be after
the deadline for the actions to be completed has passed. 
Thereafter the Committee agreed to note the contents of the report. 
7.         Internal Audit Section Update 
A report by the Audit and Risk Manager provided the Committee with an update in
the work of the Internal Audit Section. 
Following consideration the Committee agreed to note the contents of the report. 
8.         Annual External Audit Plan Year Ending 2022-23 
A report by the Depute Chief Executive (Economy, Environment and Finance)
informed the Committee of the Auditor's Annual Audit Plan for 2022/23. 
The Chair invited the External Auditor to set out the plan to the Committee. 
Page 7

Page 8

Following consideration the Committee agreed to note the contents of the External
Auditor's Annual Plan for 2022/23. 
9.         Adult Social Care Commissioning Service 
A report by the Audit and Risk Manager advised the Committee on an audit of Adult
Social Care Commissioning Service within Health and Social Care Moray (HSCM)
completed by KPMG Governance, Risk and Compliance Services. 
During consideration the Chief Officer HSCM advised that regular reporting would
be undertaken to the Audit and Scrutiny Committee on the progress of implementing
the recommendations detailed within the KPMG report. 
Councillor McLennan left during discussion of this item. 
Following consideration the Committee agreed to note the contents of the report. 
10.         Question Time *** 
The Committee noted that no questions were asked. 
Page 8

Page 9

REPORT TO:    AUDIT AND SCRUTINY COMMITTEE ON 27 JUNE 2023 
SUBJECT: ANNUAL GOVERNANCE STATEMENT 
BY: CHIEF EXECUTIVE 
1. REASON FOR REPORT 
1.1     The report provides Committee with a copy of the Council’s Annual
Governance Statement for 2022/23 for information and review. 
1.2     This report is submitted to Committee in terms of Section III (I) (5) of the
Council’s Scheme of Administration relating to supporting the council’s
governance arrangements through review of the Annual Governance
Statement. 
2. RECOMMENDATION 
2.1     That Committee considers this report and notes the contents of the 
Annual Governance Statement provided as Appendix 1. 
3. BACKGROUND 
3.1      The function of good governance in the public sector ensures that entities act
in the public interest at all times. Governance comprises the arrangements put
in place to ensure intended outcomes are defined and achieved. 
3.2 The Chartered Institute of Public Finance and Accountancy (CIPFA) and the
Society of Local Authority Chief Executives (SOLACE), building on work
undertaken by the International Federation of Accountants, have published a
guidance framework on ‘Delivering Good Governance in Local Government’. 
3.3  The Local Authority Accounts (Scotland) Regulations 2014 requires the
Council to publish an Annual Governance Statement with its annual accounts.
The Statement is based on the guidance and summarises practice across the
seven principles identified within the framework, considers the roles of those
who oversee the development and operation of such practice, and provides an
overall assessment of the effectiveness of governance arrangements. The
statement includes an annual opinion provided by the Audit and Risk Manager
in line with Public Sector Internal Audit Standards. 
3.4  Good governance practice involves both elected members and officers and
this is reflected in the requirement for the statement to be certified by both the
Leader of the Council and the Chief Executive as Head of Paid Service.
Item 5.
Page 9

Page 10

3.5  The statement is subject to review by external audit, where the external auditor
is required to report on anything believed to be inconsistent with any other
findings disclosed from the audit work. There has been nothing to report in this
regard in previous annual audits. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan
(LOIP)) 
Internal audit work supports good governance and the delivery of
efficient services. 
(b) Policy and Legal 
The Annual Governance Statement forms part of the annual accounts
the Council is required to prepare under statute. 
(c)  Financial Implications 
No implications directly arising from this report. 
(d)  Risk Implications 
Good governance includes the effective management of risk, as
evidenced in this ‘risk implications’ paragraph in all reports that come
before the council and its committees, and in the council’s corporate risk
register that is kept under review by Senior Management and reported
annually to the Corporate Committee. 
(e) Staffing Implications 
No direct implications. 
(f) Property 
No implications. 
(g) Equalities/ Socio Economic Impacts 
No implications. 
(h) Climate Change and Biodiversity Impacts 
No implications directly arising from this report. 
(i) Consultations 
The Chief Executive, and Corporate and Senior Management Teams
have been consulted and have contributed to the content of the Annual
Governance Statement. In addition, the Leader of the Council, as a
signatory to the Statement, has also been consulted. 
Page 10

Page 11

5. CONCLUSION 
5.1 This report provides Committee with a copy of the draft 2022/23 Annual
Governance Statement, which has been produced following completion
of the annual review of the Council’s governance arrangements and
system of internal control. 
Author of Report:  Atholl Scott, Business Continuity and Risk Management Officer
Background Papers: Various including Committee Reports and Senior Manager   
Assurance Statements
Ref: AS/asc270623/ags  
Page 11

Page 12

Page 12

Page 13

Appendix 1
Annual Governance Statement 2022/23 
Scope of Responsibility 
The council is responsible for ensuring that its business is conducted in accordance
with the law and proper standards, and that public money is safeguarded, properly
accounted for, and used economically, efficiently and effectively. The council has a
statutory duty to make arrangements to secure Best Value under the Local
Government in Scotland Act 2003. 
In discharging these responsibilities, Elected Members and the Corporate and Senior
Management Teams are responsible for putting in place proper arrangements for the
governance of the council’s affairs and for facilitating the effective exercise of its
functions. In delivering these functions, there is a requirement to have effective
partnership working with others, principally with NHS Grampian and Moray
Integration Joint Board, Grampian Valuation Joint Board and the Moray Leisure
Centre, as well as with other bodies involved in Community Planning. 
This annual governance statement explains how the council has used the
CIPFA/SOLACE 2016 Framework ‘Delivering Good Governance in Local
Government’ as a basis for considering the effectiveness of its own governance
arrangements. The framework predates the Covid 19 pandemic, yet remains
relevant as a good practice guide on how councils should be ‘managed and
controlled’.
Framework for Good Governance 
The overall aim of the ‘Delivering Good Governance in Local Government’
Framework is to ensure that: resources are directed in accordance with agreed
policy and according to priorities; there is sound and inclusive decision making; and
there is clear accountability for the use of those resources in order to achieve
desired outcomes for service users and communities. 
The CIPFA/SOLACE Framework defines the seven core principles of good
governance, namely: 
1. Behaving with integrity, demonstrating strong commitment to ethical values, and
respecting the rule of law; 
2. Ensuring openness and comprehensive stakeholder engagement; 
3. Defining outcomes in terms of sustainable, economic, social and environmental
benefits;
4. Determining the interventions necessary to optimise the achievement of the
intended outcomes; 
Item 5.
Page 13

Page 14

5. Developing the entity’s capacity, including the capability of its leadership and the
individuals within it;
6. Managing risks and performance through robust internal control and strong public
financial management; and 
7. Implementing good practices in transparency, reporting, and audit to deliver
effective accountability.
The key elements of the council’s governance arrangements are described in terms
of the seven principles defined in the Framework, summarised as follows: 
1. Behaving with integrity, demonstrating strong commitment to ethical values,
and respecting the rule of law; 
The roles and responsibilities of elected members and officers and the processes to
govern the conduct of the council’s business are defined in procedural standing
orders, a scheme of administration, a scheme of delegation, and financial
regulations. These are updated regularly as required, with a review of committee
structures completed during the year. Codes of Conduct for both elected members
and officers have been developed and these define the ethical values and standards
of behaviour expected. The Codes draw on the ‘Standards in Public Life’ covering
issues including leadership, fairness and integrity. 
A Monitoring Officer is responsible for ensuring that agreed procedures are followed
and that all applicable statutes and regulations are complied with. Elected members
have been provided with induction training post the Local Government elections in
May 2022 and definitions of leadership roles and behaviours developed and agreed. 
2. Ensuring openness and comprehensive stakeholder engagement;
As the recovery from the pandemic continues and the council looks for improvement
and modernisation opportunities, meetings of the council and its committees are now
delivered using a hybrid format that enables attendance in person or via web link.
Meetings are live streamed and thus available for public viewing, with matters
discussed and determined in confidence relating only to those deemed confidential
in terms of Part 1 of Schedule 7A of the Local Government (Scotland) Act 1973.  The
rationale for all decisions proposed and taken is fully set out in committee reports. 
Stakeholder engagement is central to the council’s work at a strategic level, e.g.,
with community planning partners and on policy development or planned changes to
services affecting communities or individual service users. Such engagement
includes activity targeting citizens who are less likely to participate so as to better
inform decision making processes. During the year, the Community Planning
Partnership worked with community and third sector partners to refresh the
Community Engagement Strategy. This was officially re-launched at an event in UHI
Moray, and the updated strategy will support the development of future community
Page 14

Page 15

and corporate plans as well as guiding consultation with local communities, for
example, in progressing the participatory budgeting initiative. 
The council seeks and obtains feedback on delivery of its services having adopted a
comprehensive complaints procedure based on a model scheme developed by the
Office of the Scottish Public Services Ombudsman. All complaints are responded to
as appropriate, and inform improvements to service delivery. A comprehensive
report on complaints handling is prepared and presented annually to a council
committee. 
3. Defining outcomes in terms of sustainable economic, social, and
environmental benefits;
The creation and implementation of a vision for the local area, including expected
outcomes for the community, is encompassed in the Local Outcomes Improvement
Plan (LOIP). The overarching aim and purpose of this 10-year Plan is ‘to raise
aspirations by creating an enabling environment where our residents can achieve
expanded choices, improved livelihoods and wellbeing”. 
In particular, the LOIP recognises the importance of and benefits from reducing
inequalities and poverty, with outcomes focused on the need for a growing, diverse
and sustainable economy, building a better future for our children and young people
in Moray, empowering and connecting communities, and a broadened objective of
improving the wellbeing of our population. 
The LOIP is a partnership plan and its strategic delivery is overseen by a Community
Planning Board, which meets quarterly. The Board monitors plan performance for
each quarter and during the year considered a number of key strategic documents,
notably the NHS Grampian ‘Plan for the Future’  2022-2028, that seeks to address
pressures within the Health Service; and a refreshed Moray Economic Strategy
2022-2032 that has regard to change occasioned by the pandemic, the UK departure
from the European Union, cost of living and doing business pressures, Climate
Change and Net Zero targets, and the progress to date of the Moray Growth Deal. 
Aligned to the LOIP, the council has its own Corporate Plan 2019-2024 that details
specific council priorities under the banner of ‘Our People, Our Place, Our Future.’
The plan sets targets for improvement consistent with maintaining a sustainable
council that provides valued services to its communities, and these targets are
monitored through a Performance Management Framework. A review of the plan,
involving wide consultation and incorporating the priorities of the council formed post
the local government elections in 2022, has been progressed during the period. This
work will inform a new Corporate Plan that will run from 2024. 
4. Determining the interventions necessary to optimise the achievement of the
intended outcomes; 
The strategic Community and Corporate Plans are translated into service plans
prepared within each service area. These facilitate delivery of agreed outcomes and
assist in securing continuous improvement. Service plans are reported to a meeting
of the council or appropriate service committee for consideration and approval, in
Page 15

Page 16

reports that provide detailed information on planned activity. The reports contain a
‘Summary of Implications’ section that links report content to strategic plans, legal
and policy issues; risk, staffing and property matters; equalities; social impact; and
climate change and biodiversity considerations. A particular focus is given to
financial implications given the current economic climate.
The council is fully aware of the financial challenges it faces and through its
established committee structures, elected members have been provided with an
extensive volume of information on both the availability of resources and options for
future service delivery. This has been reflected in reports to the council on budget
setting, including projections for the next two years; a capital strategy; and regular
budget monitoring reports. The council successfully delivered a balanced budget for
2023/24.
Other interventions contributing to good governance during the period included
reports providing high-level assessments of council priorities, service pressures and
risks, and how these are inter-connected, as well as the provision of updates on
numerous policy initiatives including Workforce Planning, Climate Change,
Educational Attainment, and Best Value.
Progress towards achieving agreed outcomes is monitored through an established
Performance Management Framework that calls for quarterly reporting on key
performance measures developed for each service. In addition, the council
participates in the Local Government Benchmarking Framework which compares a
range of established performance measures with those of other Scottish local
authorities. Elected Members are provided with reports to review, scrutinise and note
actions undertaken by Services to improve performance. 
5. Developing the entity’s capacity, including the capability of its leadership
and the individuals within it;
The Corporate Management Team (CMT) consists of the Chief Executive, two
Depute Chief Executives and the Chief Officer, Health & Social Care (Moray
Integration Joint Board), supported by a Senior Management Team (SMT)
comprising nine Heads of Service. CMT/SMT meet frequently to discuss and provide
leadership on the strategic direction of the council.   The roles of officers are defined
in agreed job profiles. 
The Chief Executive is responsible and accountable to the council for all aspects of
management including promoting sound governance, providing quality
information/support to inform decision making and scrutiny, supporting other
statutory officers, and building relationships with all elected members. 
Leadership capacity of senior officers is supported through the promotion of a
Leadership Forum, which brings together senior managers from all services to
provide a wider perspective on the consideration of issues facing the council. Forum
meetings ensure consistent messaging is available from senior management to
Page 16

Page 17

managers. Human Resources have continued to review and refine the leadership
development strategy and provide training opportunities online. 
The council has an agreed elected members’ development strategy that, in addition
to the Induction Programme, includes an on-going training programme of learning,
development and briefings. Members appointed to certain committees also receive
specific training related to the responsibilities of these committees.
In addition, elected members represent the council on a range of outside bodies,
including on boards of other Community Planning partners, across partnership
bodies such as the Moray Economic Partnership, various national bodies such as
COSLA and its themed Boards, and a broad range of charitable and third sector
organisations. This representation provides valuable learning and networking
opportunities for those members. 
6. Managing risks and performance through robust internal control and strong
public financial management; 
The council has a risk management policy and strategy designed to support the
identification, evaluation and mitigation of risks that may impact on its ability to meet
its objectives. A Corporate Risk Register provides summary information on what the
CMT/SMT considers are the principal risks facing the council and how these are
managed and controlled. Risk implications also feature in committee reports to
inform the decision-making process.
The council’s system of internal control is based on a framework of financial
regulations, regular management information, administrative procedures,
management supervision and a scheme of delegation that defines accountabilities of
senior officers. Establishing and maintaining an effective system of internal control is
a management function. An Audit and Scrutiny Committee, through its consideration
of reports by internal and external auditors, monitors the effectiveness of the system
of internal control.
Strong financial management is secured through the work of the Chief Financial
Officer appointed in terms of s. 95 of the Local Government (Scotland) Act 1973.
This officer advises the Council on all financial matters and ensures the timely
production and reporting of budget estimates, budget monitoring reports and annual
accounts. Draft and audited Annual Accounts are published on the council website. 
7. Implementing good practices in transparency, reporting, and audit to deliver
effective accountability;
Council business is conducted through an established cycle of webcast committee
meetings. Webcasts remain available for viewing for 12 months following a meeting.
Meeting dates are published in advance, and agenda papers are made available at
least one week before meetings take place. Minutes of meetings are prepared and
important decisions are publicised on the council website and through social media.
Page 17

Page 18

The council’s website provides a platform from which to disseminate a wide range of
information including news items on policy decisions, guidance on council services
and on service disruptions/interruptions arising from weather events or similar. The
website facilitates efficient access to digital services across a range of service areas
and allows for consultations to be undertaken and for interested parties to provide
feedback electronically. 
The council responds to the findings and recommendations of Internal Audit,
External Audit, Scrutiny and Inspection bodies generally by developing improvement
Action Plans. The Audit and Scrutiny Committee is integral to overseeing
independent and objective assurance processes that make recommendations for
improvements to the system of internal control. The Committee’s Terms of
Reference were reviewed and updated during the year.
The council responds to requests for information and Freedom of Information
legislation having processed over 1,300 such requests during the period covered by
this statement. 
Review of Adequacy and Effectiveness of the Council’s Governance
Framework 
In order to assess the effectiveness of the governance framework, including the
system of internal control, it is necessary to consider the role of the functions and
individuals who contribute to it, as follows: 
•  Elected Members 
Governance arrangements at a political level emanate from the council, its
committees and from other roles that elected members fulfil. These include
participation in the Community Planning Board and associated groups for multi-
agency issues. Elected members also have substantive roles on the Moray
Integration Joint Board for Health and Social Care, the Grampian Valuation Joint
Board, and the Moray Leisure Arm’s Length External Organisation (ALEO), each of
which has its own governance arrangements. In addition, elected members have
membership and represent Moray Council interests in partnerships that contribute to
meeting council aims and objectives, notably in the development and delivery of the
Moray Growth Deal.  
• Audit and Scrutiny Committee
The council has an Audit and Scrutiny Committee where elected members consider
reports on audit work completed. These provide assurances on the adequacy and
effectiveness of the system of internal controls including those relative to the delivery
of plans, compliance with laws and regulations, accuracy of information and
safeguarding of assets. The Committee also receives reports on the performance of
and trends from council services regarding service standards and performance
information. During the period covered by this statement, to further strengthen
oversight processes, two external members have been appointed to the committee in
Page 18

Page 19

line with Chartered Institute of Public Finance and Accountancy best practice
guidance for Audit Committees operating in Local Government. 
This committee is a key component of good governance, distinguished from other
committees by the role elected members are required to fulfil, not in setting policy or
considering service matters, but by providing independent oversight and challenge in
support of the council’s duty to secure continuous improvement. These functions are
delivered independently from the supervisory oversight roles of the Corporate and
Senior Management Teams. 
• The Corporate Management Team 
The Corporate Management Team (CMT) has overarching operational responsibility
for good governance arrangements. The team comprises the Chief Executive, two
Depute Chief Executives with portfolio responsibilities for Education, Communities
and Organisational Development; and Economy, Environment and Finance
respectively, and the Chief Officer (Health and Social Care Integration). 
• The Corporate Management Team / Senior Management Team 
This is an extended management team comprising the CMT and Heads of Services.
The role and remit of this group is to support the formulation and implementation of
policies, strategies and plans to achieve local and national outcomes, share and
promote good practice from an inter-service perspective, to act with the wider
objectives of the council in mind to ensure the resources are effectively deployed,
and assist CMT in keeping the governance of the council and its services under
review. 
Individual Heads of Service, collectively the Senior Management Team (SMT), have
considered the effectiveness of governance arrangements within their respective
services by reference to the principal risks identified in the Council’s corporate risk
register and provided assurance statements for use in the preparation of this
corporate statement. This affirms the broad ownership of good governance and
recognition of its importance within the senior leadership of the council.
Generally the assurance statements are positive with limited commentary on
governance weaknesses, albeit it has been noted in several statements that minor
data breaches have occurred. While in part this may be a reflection of a move to
hybrid working post pandemic and an increase in electronic communications, the
importance of holding personal data securely has been recognised and priority given
to refresher training on this topic. This should minimise the risk of further similar
breaches occurring. 
• The Head of Governance, Strategy and Performance (Monitoring Officer) /
Chief Financial Officer 
Page 19

Page 20

The Head of Governance, Strategy and Performance and the Chief Financial Officer
perform their respective statutory duties as outlined elsewhere in this statement. In
discharging the responsibilities of the role, the Chief Financial Officer complies with
the governance requirements of the CIPFA Statement on the role of the Chief
Financial Officer, and the Head of Governance, Strategy and Performance provides
an information annual report on the duties of Monitoring Officer to a meeting of the
council.
• The Chief Social Work Officer 
The Head of Service for Health and Social Care Moray undertakes the statutory role
of Chief Social Work Officer (CSWO). The latest available CSWO annual report for
the 2021/22 year noted that governance and accountability arrangements remained
unchanged throughout the year, with accountability of the CSWO being to the Moray
Integrated Joint Board (MIJB) for adult services, and to Education, Communities and
Organisational Development Committee and Moray Council on matters relating to
children and young people and justice social work. 
The report noted that planning for the delegation of children’s social work to the
Integrated Joint Board was continuing, and it has since been confirmed that this will
proceed during 2023/24. Overall the report concluded that notwithstanding the
governance arrangements in place, Social Work, like other areas of Health and
Social Care, continued to experience pressures. 
• Internal Audit 
The council has a system of internal control designed to manage risk to a reasonable
level. Internal controls cannot eliminate the risk of failure to achieve policies, aims
and objectives and can therefore only provide reasonable and not absolute
assurance of effectiveness. 
The Audit and Risk Manager complies with mandatory Public Sector Internal Audit
Standards and with published good practice guidance e.g. on the Role of the Head
of Internal Audit in Local Government. During the year, the Internal Audit Charter and
the council’s Policy to Combat Fraud, Theft, Bribery and Corruption were updated.
The Audit and Risk Manager is accountable on a day-to-day basis to the Head of
Governance, Strategy and Performance and to the Audit and Scrutiny Committee. 
The internal audit plan for the year includes a range of audit projects covering main
financial systems, other systems operating within services and several ad-
hoc/unplanned projects. The outcomes from these projects, together with any
recommendations to enhance the control environment, are reported to the Audit and
Scrutiny Committee. This Committee is chaired by an elected member who is not
part of the council Administration. Almost all planned reviews detailed within the
Annual Internal Audit Plan for 2022/23 have been completed. 
The Public Sector Internal Audit Standards require an internal audit opinion to be
provided annually. As planned audit work was substantially completed by the year-
Page 20

Page 21

end, and based on his wider knowledge of the organisation and its control systems, it
is the opinion of the Audit and Risk Manager that reasonable assurance can be
placed upon the adequacy and effectiveness of the governance and control
environment which operated in the council during the year. 
• Health & Social Care Integration 
The council, as a key partner within Health and Social Care Moray has an interest in
the governance arrangements within the Moray Integration Joint Board (MIJB).
Internal Audit arrangements for the MIJB are provided jointly by the council’s Internal
Audit service and NHS Grampian’s Internal Auditors. The council’s Internal Audit
Service provides assurance over social care services, and oversight of the MIJB
governance arrangements. A separate internal audit opinion is provided in respect of
audit projects completed for the MIJB. 
• External Agencies 
In addition to the various internal review processes and the external audit of the
Annual Accounts, aspects of the council’s governance arrangements are considered
in various inspection reports produced by the external auditor and other inspectorate
agencies.
Audit Scotland’s Best Value Assurance Report on Moray Council contained eight
recommendations. An action plan was developed in response and good progress
has been made. The council remains committed to responding positively to the
remaining recommendations to strengthen governance arrangements, with progress
closely monitored and updated status reports on each action being reported to the
appropriate committee. 
Overall assessment of the effectiveness of governance arrangements
Having regard to the information provided in the preceding paragraphs, it is
considered that established systems and processes are broadly effective and not
inconsistent with the seven principles identified in the ‘CIPFA/SOLACE’ Framework
‘Delivering Good Governance in Local Government.’ 
Significant governance issues 
Governance issues highlighted as significant in the Annual Governance Statement
for 2021/22 went beyond describing governance processes and how effective they
operated in practice, also providing commentary on the planned strategic direction of
the council and its partners, and linked risk issues. That strategic direction continues
to be developed and adapted in response to multiple factors both external and
internal, and is covered more appropriately in a separate Management Commentary,
also published with the Annual Accounts. 
Page 21

Page 22

Specific governance issues noted in the prior year and how they have been addressed
relate to:
An externally commissioned review on the management of social care
contracts; - a report on this was published in February 2023, and has been
submitted to the Audit, Performance and Risk Committee of the Moray integration
Joint Board and to the council’s Audit and Scrutiny Committee for their respective
interests. The report covers a complex area of work, with Self-directed Support
legislation enabling individuals to exercise choice and control over the support or
services required to meet assessed care needs. While the legislation provides
welcome flexibility in terms of personalising care provision, this has created
challenges for the Commissioning Service to review and update contractual
agreements with multiple suppliers of care services, at a time when these services
are operating under difficult market conditions with staffing and cost pressures widely
documented. 
The report makes recommendations to strengthen governance arrangements and
deliver improvements. These recommendations have been accepted by the
management of Health and Social Care Moray, and will require the Commissioning
Service to work more closely with the council’s procurement team going forward, and
to develop an action plan for improvement that assigns responsibilities to relevant
officers and sets timescales to enable progress to be effectively monitored.  
Addressing the key challenges to support education recovery and the need for
improving attainment; - Educational Services has refreshed its standards for
Professional Leadership and Learning 2022-2025. This has updated its vision to
support and develop Moray teachers and practitioners to enable children and young
people to be the best they can be. Attainment results have been monitored and
reported to council in a detailed report which outlined achievements as well as
challenges that require to be addressed as the service emerges from the pandemic.
A number of other governance issues have been identified that require further
development in the incoming period relating to curriculum improvements,
inspections, and aspects of financial management.
Managing the fine political balance with new Members through a commitment
to collaboration across all Councillors; - a programme of induction has been
delivered for new and returning elected members of the council. Briefing sessions
have been provided as necessary on corporate and service projects as appropriate.
Political Leaders have recognised the importance of collaborative working where
possible and this message has been reinforced by the council’s Corporate/ Senior
Management Team both informally and in committee reports covering strategic
topics including on Best Value and on the Corporate Overview of Council Priorities. 
Additional developments in the council’s risk management and business
continuity arrangements; - a part - time officer has been appointed to assist in the
assessment of risks affecting the council, and support the preparation of business
Page 22

Page 23

continuity plans to aid delivery of critical services in the event of a disruption. An
early stage review has been completed to inform areas requiring priority attention.
The focus has been on the identification of critical functions and to align business
continuity planning with risk management practice, thus ensuring that there is
justification for allocating resources to particular tasks. A plan is in place to progress
this work within council services and to develop links with partners and emergency
planning as appropriate.  
Increased numbers of data breaches have highlighted the need for further data
protection training; - data breaches, albeit in small numbers, continue to be
highlighted across a number of service areas, potentially a consequence of staff
working in a more diverse way during and since the pandemic. The council has
addressed this by updating its mandatory e-learning module covering General Data
Protection Regulations (GDPR) and has developed a refresher training course for
staff to annually measure their understanding of this important topic. Internal audits
of information governance and of compliance with the GDPR requirements were
completed and action plans developed and agreed with management for
implementation during 2023/24. 
Implementation of actions arising from the latest Best Value Progress Report
from the Accounts Commission; -  A Best Value action plan was submitted and
approved by council covering a number of themes – increasing the pace of
transformational change, performance reporting, financial planning and
sustainability, and improving educational attainment. The importance of committed
decisive leadership was also highlighted as an issue in the Best Value report - this
has been recognised as a political risk in the corporate risk register and in a number
of reports to council and its committees on matters relative to strategic direction and
good governance. 
Concluding Remarks 
This Annual Governance Statement summarises the extensive governance
arrangements the council has in place to support delivery of its strategic plans and to
secure Best Value in its use of resources. While the statement demonstrates that
these arrangements are comprehensive and broadly fit for purpose, there are
multiple challenges ahead that will impact on how council services are designed and
delivered going forward. As these challenges are addressed in the incoming period,
it is recognised that governance arrangements too will need to be adapted, and in
our respective roles as Council Leader and Chief Executive (Head of Paid Service),
we are committed to making this happen to ensure the council and its resources
continue to be effectively managed and controlled. 
Page 23

Page 24

Kathleen Robertson                                                                 Roderick D Burns
Leader of the Council                                                         Chief Executive  
28th June 2023
Page 24

Page 25

REPORT TO: AUDIT AND SCRUTINY COMMITTEE ON 27 JUNE 2023 
SUBJECT: INTERNAL AUDIT ANNUAL REPORT – 2022/23 
BY: AUDIT AND RISK MANAGER 
1. REASON FOR REPORT 
1.1 To provide Committee with a copy of the Internal Audit Annual Report for the
year ended 31 March 2023, together with the Audit and Risk Manager’s
opinion on the adequacy and effectiveness of the council’s system of internal
control.  
1.2 This report is submitted to Committee in terms of Section III (2) and (7) of the
Council’s Scheme of Administration relating to consideration of reports from
the Council’s Internal Auditor and monitoring delivery of the audit service
carried out by Internal Audit. 
2. RECOMMENDATION 
2.1 That Committee considers the contents of the annual report given as
Appendix 1 to this report and seeks clarification on any matters
relating thereto. 
3. BACKGROUND 
3.1 The purpose of this report is to present to the Audit and Scrutiny Committee
the Internal Audit Annual Report for the year to 31 March 2023, which includes
the Audit and Risk Manager's independent assurance opinion on the adequacy
of the Council's overall control environment. 
3.2  The Public Sector Internal Audit Standards (PSIAS) requires the Chief Audit
Executive (CAE), the Council’s Audit and Risk Manager, to provide an annual
internal audit opinion and report on the adequacy and effectiveness of the
Council’s governance, risk management and internal controls to support the
preparation of the Annual Governance Statement. 
3.3  To meet the requirements of the PSIAS, the Internal Audit Annual Report
2022/23, at Appendix 1, includes the annual Internal Audit opinion and
provides details of the Internal Audit activity and performance during the year.
Item 6.
Page 25

Page 26

4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan
(LOIP))
Internal audit work supports good governance and the delivery of
efficient services. 
(b) Policy and Legal
No implications. 
(c) Financial Implications
No implications directly arising from this report. 
(d) Risk Implications
The independent review of selected systems and procedures mitigates
the risks associated with inadequate or ineffective control procedures. 
(e) Staffing Implications
No implications. 
(f) Property
No implications. 
(g) Equalities/ Socio Economic Impacts
No implications. 
(h) Climate Change and Biodiversity Impacts
No implications. 
(i) Consultations
There have been no direct consultations during the preparation of this
report. 
5. CONCLUSION 
5.1 The Internal Audit annual report provides a summary overview of the
nature and extent of audit work carried out during the year to inform the
audit opinion on the internal control environment operating within the
Council. 
Author of Report:                Dafydd Lewis, Audit and Risk Manager
Background Papers: Internal audit files
Ref:                                    SPMAN-1042990102-158 / SPMAN-1042990102-159
Page 26

Page 27

APPENDIX 1 
INTERNAL AUDIT ANNUAL REPORT and OPINION
1 APRIL 2022 to 31 MARCH 2023
Item 6.
Page 27

Page 28

CONTENTS    Page
SECTION 1 –  INTRODUCTION                                                                                             3
SECTION 2 –  BASIS OF OPINION                                                                                       3-4
SECTION 3 –  SUMMARY AND LIMITATIONS OF WORK THAT SUPPORTS OPINION 4-9
SECTION 4 –  OPINION                                                                                                          9 
Page 28

Page 29

SECTION 1 – INTRODUCTION 
Purpose of this report 
1.1 This report is issued in compliance with the Public Sector Internal Audit Standards
(PSIAS), which requires the Audit and Risk Manager to deliver ‘an annual internal
audit opinion and report that can be used by the organisation to inform its governance
statement’, and which ‘must conclude on the overall adequacy and effectiveness of
the organisation’s framework of governance, risk management and control’. This
report constitutes the required statement.  
1.2 It is management’s responsibility to maintain risk management systems, internal
control and governance. Internal Audit is an element of the internal control framework
established by management to examine, evaluate and report on accounting and other
controls over operations. Internal Audit assists management in the effective
discharge of its responsibilities and functions by examining and evaluating controls.
Internal Audit cannot be held responsible for internal control failures.  
1.3 Internal Audit’s role includes assessing the adequacy of the risk management,
internal controls and governance arrangements put in place by management and
performing testing on a sample of transactions to ensure those controls were
operating for the period under review.  
1.4 Public Sector Internal Audit Standards (PSIAS) require officers of the Internal Audit
Section to communicate on a timely basis all facts and matters that may have a
bearing on their independence. I can confirm that all staff members involved in
2022/23 internal audit reviews were independent of operational processes and their
objectivity was not compromised in any way. 
SECTION 2- BASIS OF OPINION 
2.1 This opinion is based on my knowledge of the Council’s governance, risk and control
processes and from audit work completed during the period to 31st March 2023.
There are limitations to the level of assurance that can be provided dependent on the
scope and coverage of the audit work completed. My evaluation is based on the
following:    
• The audit work undertaken by Internal Audit during the year to 31st March 2023.    
• The assurance statements signed by Heads of Services on the operation of the
internal financial controls for the services they were responsible for during the
year to 31st March 2023. 
• The governance statement of the Council for the year ended 31st March 2023. 
• Reports issued by the Council’s External Auditor, Audit Scotland, and other
external review agencies.
Page 29

Page 30

• My knowledge of the Council’s governance, risk management and performance
monitoring arrangements. 
SECTION 3- SUMMARY AND LIMITATIONS OF WORK THAT SUPPORTS THE
OPINION 
3.1 Internal audit operates independently within the organisation. While there may have
been limitations in the scope of the audit due to the pandemic, there have been no
limitations imposed by management on the scope of audit work performed. The
internal audit opinion has been informed by the audit work completed during the year. 
3.2 The annual audit plan presented to the Audit and Scrutiny Committee at the start of
the year describes in some detail the framework around which audit work is
developed. In addition, the selection of audit topics was selected having regard to
corporate planning documents, budget data and information drawn from the
corporate risk register, and takes into account input from senior management
regarding possible areas for audit. The work undertaken by Internal Audit in
2022/2023 is summarised below. 
3.3 The internal audit work has been conducted in accordance with an established
methodology that promotes quality and conformance with the Public Sector Internal
Audit Standards and the agreed Internal Audit Annual Audit Plan. 
Planned audit coverage Status
Housing Benefits - Rent Rebates and Rent
Allowances 
Completed
Procurement and Creditor Payments Completed
Payroll  Completed
Capital Plan- Aberlour Early Years Learning &
Childcare Scheme   
Completed
Stocks and stores - year end valuations  Completed
Cyber security   Completed
Collection and accounting of planning  fees                 Completed
Housing and Property- Planned Maintenance
Works 
Completed
General Data Protection Regulation                Completed
Environmental & Commercial Services –
Stores
Completed
Refuse Collection (Domestic)  Completed
Moray Growth Deal                Completed
Education – Secondary School Completed
Emergency Planning Completed
European Social Fund Completed
Corporate Services - ICT  Hardware Asset
Management 
Deferred to a future Audit
Plan
Care First System  Completed
Self Directed Support  Completed
Information Management Completed
Page 30

Page 31

Progress on the 2022/2023 Internal Audit Plan 
3.4 Progress against planned audit work for the year to 31 March 2023 can be
summarised as follows:- 
• Each year, an element of the plan covers work on core financial systems, which
are of key significance to the Council in terms of good financial governance.
These systems receive the most significant focus in terms of management control
and are also reviewed on a cyclical basis by the External Auditor to obtain
assurances needed for the audit of the annual accounts. 
• Summaries of the issues arising in relation to each system or activity covered by
internal audit work in 2022/2023 have been reported separately to the Audit and
Scrutiny Committee. Appropriate responses to the recommendations are also
included. When actioned, the recommendations made in the internal audit reports
should provide management with additional comfort that the system of control
operates as intended. It is therefore imperative that the agreed actions are
implemented by management. 
• The impact of the pandemic has resulted in changes in the working practices of
services with officers working from home. This has required a change to
established working practices, e.g., making greater use of audio, video, and
screen-sharing software applications. These changes in working practices have
brought challenges; however, using an Internal Audit Software Application has
assisted in ensuring consistency in working practices. 
• Despite these constraints, I am pleased to report that the majority of the Audit
Plan for 2022/23 has been completed. In addition to the planned audit work, an
investigation was undertaken within Building Services regarding an allegation of
overtime paid to two officers. This resulted in a report to the Building Services
Manager detailing variances between the overtime claimed and the actual hours
worked. The scope of a planned review of planned maintenance works was
subsequently increased to include an overview of the systems and practices for
authorising overtime payments within Building Services. 
• Additional testing was also required within a planned review of the payroll system
due to an incident regarding the unauthorised access to an officer’s Employee
Self-Service account. This included a check of a sample of officers who had
requested the Payroll Section to reset their passwords for access to their
Employee Self-Service accounts. It is pleasing to note that no issues were noted,
but the audit has included recommendations to improve controls within the payroll
system. 
• An audit was undertaken into the operational management arrangements for the
refurbishment of Aberlour early years learning and childcare premises. The
Depute Chief Executive (Education, Communities & Organisational
Development) requested the review after concerns were raised by elected
members regarding the scheme. The scope of the review was to undertake an
overview of the reporting arrangements and compliance with Financial
Regulations, Procurement Guidelines for the refurbishment of the premises. A
Page 31

Page 32

number of recommendations were made to enhance future governance and
administrative arrangements. All recommendations have been accepted. 
• The Internal Audit Section coordinates the Council’s participation in the National
Fraud Initiative, a data-matching exercise involving a range of public sector
bodies. This activity is viewed as complementary to other audit activities, and
participation assists Internal Audit in assessing the potential for the occurrence
of fraud and related fraud risk. The Corporate Investigations Officer provides
support to services for matches needing investigation and also for undertaking
an overview of the process. However, due to sickness, these duties had to be
done by an Auditor, which has impacted the number of days available to complete
the Annual Audit Plan. 
3.5 The total number of recommendations made is set out in the following table: 
Report Risk Ratings for
Recommendations
System/ Testing
Assessment 
High Medium Low 
2021/22 Audit Plan H   
Housing Benefits - Rent Rebates and Rent
Allowances 
0 0 0 Full
Procurement and Creditor Payments 0 0 0 Full
Procurement and Creditor Payments (MIJB) 2 2 0  Limited
Payroll  4 1 0  Substantial
Capital Plan - Aberlour Early Years Learning &
Childcare Scheme  
3 3 0 Limited
Cyber security   3 3 0 Substantial
Collection and accounting of planning  fees  0 1 2  Full
Housing and Property- Planned Maintenance
Works 
0 7 2 Substantial
General Data Protection Regulation 5 2 1 Limited
Environmental & Commercial Services –
Stores   
Substantial
Refuse Collection (Domestic)  1 4 3 Substantial
Moray Growth Deal 2 3 0 Substantial
Education – Buckie High School 0 1 2 Full
Emergency Planning 1 6 0 Substantial
European Social Fund 0 0 0  Full
Care First System  0 9 1 Limited 
Self Directed Support  7 3 0 Limited
Information Management 1 5 0 Limited 
Page 32

Page 33

3.6   The following performance measures were in place for 2022/2023: 
Measure Description Target Actual
Final Report Percentage of Auditee(s) responding
within 20 days of receiving the draft
report.
100% 69%
Final Report Percentage of final audit reports issued
within 10 days of agreeing the draft
report
100% 100%
Audit Plan Delivery Percentage of audits completed v
planned.
85% 94%
Audit Budget Percentage of audits completed within
budgeted days.
80% 75%
Audit
Recommendations
Percentage of audit recommendations
agreed.
90% 100%
Customer
Feedback
Percentage of respondents who rated
that the audit added value and provided
meaningful results.
100% 100%
Follow Up Reviews Percentage of Follow Up Reviews
completed v planned
100% 90% 
It is pleasing to report the majority of planned projects within the Audit Plan for last
year was completed. In addition, all reports were issued as “final” within 10 days of
agreeing the draft report, and officers agreed to all recommendations. Completion of
audit projects within individual budgets was below target; however further testing was
required within the reviews of Planned Maintenance Works and the Payroll System.
In addition, significant findings were found in the reviews administered by the Moray
Integration Joint Board. Difficulties were experienced in obtaining replies to audit
recommendations within 20 days of officers receiving the draft report. Heads of
Services have been informed of the need to respond promptly to audit
recommendations, but the demands on officers to meet service requirements are
appreciated.   
3.7 Governance – in supporting the preparation of the Council’s Annual Governance
Statement, sufficient information was obtained by Internal Audit to conclude that the
Council generally complies with the latest good governance practice issued by CIPFA
/SOLACE, and that the Corporate Management Team (comprising the Chief
Executive, two Depute Chief Executives and the Chief Officer - Moray Health and
Social Care ) and Senior Managers have a strong awareness of the challenges facing
the Council in the incoming period. Written assurances from senior managers also
considered governance practice within individual service areas.  
3.8 Key governance and internal control arrangements have been maintained, albeit
capacity issues called for resources to be prioritised for essential services and to take
forward the Council's strategic priorities. Internal Audit noted progress made in
several key priority areas while supporting the development of the annual governance
statement. This has included the development of a Scrutiny Guide and further
expanding the role of the Audit and Scrutiny Committee. The pandemic required
committee meetings to be remotely, however the Council agreed in June 2022 to a
Page 33

Page 34

hybrid system, allowing officers and members to join meetings from within and
outwith the chamber.   
3.9    Risk Management – procedures have been developed with a risk management
policy in place and risk registers maintained at corporate and service levels. It is
pleasing to report that additional resources were provided with the appointment of a
Risk Management and Business Continuity Officer. The Risk Management and
Business Continuity Officer has assisted in facilitating further implementation and
development of risk management arrangements within Services. This should ensure
more effective service-level risk management to underpin the Corporate Risk
Register. 
3.10 The Corporate Risk Register is regularly reviewed by the senior management and
was approved by the Corporate Committee in August 2022. Political and financial
risks figure highly given the acute challenges the Council has faced and continue to
face going forward. Successful implementation of the Improvement and
Modernisation Programme will be vital to improving the future efficiency and
sustainability of Council services. 
Statement on Conformance with the Public Sector Internal Audit Standards 
3.11 The Local Authority Accounts (Scotland) Regulations 2014 require that ‘a local
authority must operate a professional and objective internal auditing service in
accordance with recognised standards and practices in relation to internal auditing’.
The recognised standards adopted by all Scottish Councils are the Public Sector
Internal Audit Standards (PSIAS) developed by the Chartered Institute of Public
Finance and Accountancy and the Chartered Institute of Internal Auditors. The
standards include a requirement for an annual self-assessment. 
3.12 Internal performance monitoring against PSIAS has been ongoing over the last few
years. However, a more structured internal assessment has recently been completed
in preparation for the next External Quality Assessment, scheduled for later in 2023.
An Action Plan detailing recommendations required for compliance with PSIAS was
reported to the February Audit and Scrutiny Committee. It is pleasing to report that
all recommendations have been implemented. This included a change in the
Committee reporting arrangements with reports now from the Audit and Risk
Manager rather than the Depute Chief Executive (Education, Communities and
Organisational Development). It was also agreed that the responsibility for
preparation for the Council’s Annual Governance Report now lies outwith the Internal
Audit Service. Implementation of both recommendations has enhanced the Council’s
governance arrangements and the requirement for the opinion of the Audit and Risk
Manager to be independent of management. 
3.13 The Public Sector Internal Audit Standards require the Audit and Risk Manager to
consider whether or not the audit staffing resources are sufficient to meet the audit
needs of the organisation and where it is believed that the level of resources may
adversely impact the provision of the annual internal audit opinion, and draw this to
the attention of the Committee. Demands on the Internal Audit Service have
increased over a number of years, and it is expected this will continue. After a review
of the staffing establishment, the Council agreed to additional staff resources in the
form of an Assistant Auditor. Unfortunately, due to the current financial pressures,
Page 34

Page 35

the decision to progress with this appointment has been deferred for a year. As the
Audit and Risk Manager, I am concerned about whether available resources will be
sufficient to meet the auditing needs of the Council, Moray Integration Joint Board
and the Grampian Valuation Joint Board.
. 
3.14 In considering the sufficiency of the audit coverage, Committee is reminded that the
responsibility for developing and maintaining a sound control environment rests with
management and not with Internal Audit. 
SECTION 4- OPINION 
4.1  Any system of control can only ever provide reasonable and not absolute assurances
that control weaknesses or irregularities do not exist or that there is no risk of error,
fraud, or breaches of laws or regulations. Furthermore, it is the responsibility of
management to establish an appropriate sound system of internal control and monitor
its effectiveness. It is the responsibility of the Audit and Risk Manager to provide an
annual assessment of the robustness of the internal control system. 
4.2   It is my opinion, based on the audit work completed and other sources of assurance,
that reasonable assurance can be placed on the adequacy and effectiveness of the
Council’s internal control system for the year ending 31 March 2023. 
Dafydd Lewis
Audit and Risk Manager
13 May 2023 
Page 35

Page 36

Page 36

Page 37

REPORT TO:    AUDIT AND SCRUTINY COMMITTEE ON 27 JUNE 2023 
SUBJECT: INTERNAL AUDIT SECTION – COMPLETED PROJECTS
REPORT 
BY: AUDIT AND RISK MANAGER 
1. REASON FOR REPORT 
1.1 The report advises Committee on the work of the Internal Audit Section for the
period from 11 May 2023 to 27 June 2023. 
1.2 This report is submitted to Committee in terms of Section III (2) and (7) of the
Council’s Scheme of Administration relating to consideration of reports from
the Council’s Internal Auditor and monitoring delivery of the audit service
carried out by Internal Audit. 
2. RECOMMENDATION 
2.1 That Committee consider the contents of this report, seeks clarification
on any points noted and otherwise notes the report. 
3. BACKGROUND 
3.1 This report provides details of the following internal audit work concluded
during the period from 11 May 2023 to 27 June 2023. The reviews detailed
below conclude the audit plan for 2022/23. 
Emergency Planning
3.2 An audit review of the Council's Emergency Planning arrangements has been
undertaken. The Civil Contingencies Act 2004 places a legal obligation upon
emergency services and local authorities to assess the risk of, plan, and
exercise for emergencies, such as floods, adverse weather, pandemic or other
emergencies that could have a significant impact on the community. Effective
emergency planning is an essential component of the Council’s overall
governance arrangements to ensure the resilience of all key services in the
event of a major incident. The audit also reviewed if adequate training,
planning and testing had been undertaken to ensure the Council is prepared in
Item 7.
Page 37

Page 38

the event of an emergency. The executive summary and recommendations for
this project are given in Appendix 1.   
Self Directed Support 
3.3 A review of the financial monitoring arrangements for Self-Directed Support
(SDS) packages has been undertaken as part of the coverage for Health &
Social Care Moray activities. The Social Care (SDS) (Scotland) Act 2013 came
into force in April 2014 and introduced the Self Directed Support (SDS) term to
describe how people can exercise choice and control over the support or
services that allow them to live independently and meet agreed outcomes. The
Act requires all Local Authorities to offer options to individuals who have been
assessed as needing a care service. 
3.4    The scope of this audit was to review systems and procedures for the following
care delivery options:  
• An individual chooses their own support but is managed by Health &
Social Care Moray. 
• The care provider is arranged by Health & Social Care Moray at the
request of the service user. 
Annual expenditure for these types of care delivery options amounted to
approximately £40 million and £17 million respectively for external and in-
house (Health & Social Care Moray) care providers. The executive summary
and recommendations for this project are given in Appendix 2. 
Buckie High School 
3.5        A review of the administrative arrangements within Buckie High School has
been completed. The scope of this audit was to undertake a review of the
Devolved School Management Scheme in terms of the allocation of funding
and the management of these funds at school level. In addition to undertaking
an overview of how the School develops, monitors and controls its £4.8 million
budget, the audit reviewed the management of the staffing costs involved in
delivering the curriculum. The audit checked that non payroll expenditure
complied with Financial Regulations and Procurement Guidelines. A review
was also undertaken to ensure appropriate accounting arrangements are
followed in managing school fund monies. The executive summary and
recommendations for this project are given in Appendix 3.  
Page 38

Page 39

Environmental & Commercial Services – Stores 
3.6    A review was undertaken of the Environmental & Commercial Services Stores.
The audit reviewed the systems and controls in managing materials, parts and
equipment (stock) stored to meet the needs of Roads, Cleaning and Fleet
Services. In addition, the stores is also responsible for the purchase and issue
of approved clothing for all Council Services. Individual stock items can vary in
value from a few pounds to upwards of £1,000. Approximately £1.1 million of
stock is issued annually from stores. The executive summary and
recommendations for this project are given in Appendix 4. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan
(LOIP))
Internal audit work supports good governance and the delivery of
efficient services. 
(b) Policy and Legal
No implications. 
(c) Financial Implications
No implications directly arising from this report. 
(d) Risk Implications
The independent review of selected systems and procedures mitigates
the risks associated with inadequate or ineffective control procedures. 
(e) Staffing Implications
No implications. 
(f) Property
No implications. 
(g) Equalities/ Socio Economic Impacts
No implications. 
(h) Climate Change and Biodiversity Impacts
No implications. 
(i) Consultations
There have been no direct consultations during the preparation of this
report. 
5. CONCLUSION 
5.1 This report provides Committee with a summary of findings arising
from an audit project completed during the review period. 
Page 39

Page 40

Author of Report:                Dafydd Lewis, Audit and Risk Manager
Background Papers: Internal audit files 
Ref:                                 SPMAN-1042990102-163 / SPMAN-1042990102-160
SPMAN-1042990102-166 / SPMAN-1042990102-161
SPMAN-1042990102-162
Page 40

Page 41

Appendix 1 
AUDIT REPORT 23’021
EMERGENCY PLANNING 
Executive Summary  
The annual audit plan for 2022/23 provides for an audit review of the Council's
Emergency Planning arrangements. The Civil Contingencies Act 2004, places a legal
obligation upon emergency services and local authorities to assess the risk of, plan,
and exercise for emergencies, such as floods, severe weather, industrial accident or
other emergencies that could have a significant impact on the community. Effective
emergency planning is an essential component of the Council’s overall governance
arrangements to ensure the resilience of all key services in the event of a major
incident. An Emergency Planning Officer supports Council Services' delivery of
emergency planning arrangements. 
The objective of this audit was to provide assurance over the adequacy and
effectiveness of current controls over emergency planning. The audit scope reviewed
that adequate training, planning and testing systems have been developed to ensure
the Council is prepared in the event of an emergency. However, emergency planning
arrangements cannot exist in isolation as effective business continuity plans are
required to ensure the Council can not only deal with an emergency but also continue
to function and recover effectively afterwards.
The audit was carried out in accordance with Public Sector Internal Audit Standards
(PSIAS). 
The audit found significant work has been undertaken to ensure the Council maintains
effective emergency planning arrangements and the ability to respond operationally to
emergency events. This has been achieved despite limited staff resources. The review
highlighted the following key points: 
• The Emergency Planning Policy and Procedures have not been updated since
2014. This document is currently being reviewed and provides guidance to
officers for coordinating action in dealing with an emergency. The Emergency
Planning Policy and Procedures should be updated to reflect current operating
arrangements and staffing structures. 
• Emergency Plans have been developed detailing actions to be undertaken in
the event of an incident. It is appreciated the limited staffing resources
available, however it was found that some plans still need to be reviewed and
updated to reflect the current staffing structures of the Council and partner
organisations. After updating, testing should be undertaken to ensure
effectiveness and highlight any further improvements to Emergency Plans.     
Item 7.
Page 41

Page 42

Appendix 1 
• It was noted the Council maintains a weekly rota of senior managers designated
as Moray Emergency Response Co-Ordinators (MERC) in the event of an
incident. However, it was found that limited training is provided or documented
guidance and instructions to support officers in their duties. It was noted that
work is being carried it to improve guidance available to MERC’s. In addition, it
was also found a need to update the emergency contact details of officers. 
Page 42

Page 43

Appendix 1 
Recommendations 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Key Control: The Council’s emergency planning arrangements are fit for purpose  to respond effectively in the event of a major
incident 
5.01 The Emergency Planning Policy
and Procedures should be
updated to reflect current
operating arrangements and
staffing structures.
Medium  Yes  A new Moray
Council
General
Emergency
Plan is in
development /
draft.  Updating
both the
strategic and
operational
requirements of
the Moray
Councils
Emergency
Response
arrangements
and outlining
the
responsibilities
Emergency
Planning
Officer
31/05/2023
Page 43

Page 44

Appendix 1 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
of responder
partners.
5.02 Regular meetings should be held
between the Emergency
Planning Officer and the
Business Continuity and Risk
Management Officer to ensure
ongoing alignment of emergency
and business continuity plans. 
High Yes A Closer
working
relationship
will continue
between the
Emergency
Planning
Officer and the
Business
Continuity and
Risk
Management
Officer, to
further develop
alignment of
emergency
planning and
business
continuity
plans.
Emergency
Planning
Officer /
Business
Continuity and
Risk
Management
Officer 
Ongoing
Page 44

Page 45

Appendix 1 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
5.03 Emergency plans should be
updated to reflect current risks,
working practices and staffing
structures of the Council and
partner organisations. 
After updating the emergency
plans, testing should be
undertaken to evidence their
effectiveness and highlight any
areas for further improvement. 
Medium Yes Emergency
Plans are being
updated to
reflect risks, and
strategic and
operational
requirements. 
However this
process requires
commitment
from the heads
of services to
ensure
implementation
of this
recommendation 
Once developed,
a test exercise
schedule will be
developed to
stress test and
learn lessons
and update the
agreed plans. 
Emergency
Planning
Officer
31/12/2024 
Page 45

Page 46

Appendix 1 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
5.04 Further training and documented
guidance should be provided to
Moray Emergency Response
Co-Ordinators (MERC) to
support officers in best practices
to follow in the event of an
emergency incident. 
Medium Yes The Emergency
Planning Officer
has previously
sourced, on a
number of
occasions, free
Scottish
Government
Crisis
Management
training for
officers. This
training is now
being re-run in
May 2023 and all
MERC’s yet to
undertake have
been invited to
attend. The
Emergency
Planning Officer
has also sourced
a MERC
induction
package from a
neighbouring
authority and this
Emergency
Planning
Officer  /
Senior HR
Adviser
31/12/2023
Page 46

Page 47

Appendix 1 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
will be developed
along with
Organisational
Development for
future MERC
training delivery. 
New Action
Cards (step by
step) guidance is
in development
for MERC’s to
use at time of
incidents.
5.05 Emergency contact details of the
Moray Emergency Response
Co-Ordinators (MERC) saved
within Sharepoint should be
restricted to only officers that
require access to this
information. 
Medium Yes ICT/Sharepoint
to provide the
Emergency
Planning
Officer with a
list of access
names for
review. The
Emergency
Planning
Officer to
Emergency
Planning
Officer
31/07/2023
Page 47

Page 48

Appendix 1 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
review and
clarify those
that need
requirement
and advise ICT
accordingly.  
5.06 An Annual Report should be
provided to elected members
detailing the work undertaken
and planned within emergency
planning. 
Medium Yes An Annual
Emergency
Planning
Report will be
submitted to
members.
Consultancy
Manager     
31/03/2024
5.07 A review of the hyperlinks
contained within emergency
planning webpages should be
undertaken to ensure they
connect to the intended
document or website. 
Medium Yes The Emergency
Planning Officer
in Liaison with
the Senior
Communication
s Officer is
making
arrangements
to progress
updating of
relevant
hyperlinks.
Emergency
Planning
Officer/ Senior
Comms. 
Officer  
30/08/2023 
Page 48

Page 49

Appendix 2 
1
AUDIT REPORT 23’025
SELF DIRECTED SUPPORT   
Executive Summary 
The Internal Audit Plan for the 2022/23 year provides for a review of the financial
monitoring arrangements for Self-Directed Support (SDS) packages of adults as part
of the coverage of Health & Social Care Moray activities. The Social Care (SDS)
(Scotland) Act 2013 came into force in April 2014 and introduced the SDS term to
describe how individuals can exercise choice and control over the support or services
that allow them to live independently and meet agreed outcomes. The Act requires all
Local Authorities to offer the following 4 Options to individuals who have been
assessed as needing a care service: 
• option 1 - a direct payment, which is a payment to a person or third party to
purchase their own support
• option 2 - the person directs the available support
• option 3 - the local council arranges the support
• option 4 - a mix of the above 
The scope of the audit was to review systems and procedures in the delivery and
management of adult social care provided under Options 2 and 3 of the SDS Scheme.
This included examination of the processes to support individuals in their preferred
care delivery option, contractual relationships with care providers, financial
management and monitoring of individual care packages. Annual expenditure for
individuals in receipt of SDS Option 2 and & 3 care packages amounted to
approximately £40 million and £17 million respectively for external and internal care
providers.     
The audit was carried out in accordance with the Public Sector Internal Audit
Standards (PSIAS).  
The key areas identified for management attention include the following :- 
• The Social Care (SDS) (Scotland) Act 2013 requires Councils to provide
individuals and their families with information and support to decide on a service
user's preferred SDS care delivery option. A review of the support packages of
individuals using care services found limited evidence of discussions between
social workers and service users/families regarding the range of SDS care
delivery options. A clear audit trail should be maintained to evidence the
discussions held with service users in determining their care package.   
• It was noted that where care is delivered through SDS Option 2, a tripartite
agreement should be agreed to detail the care provided, signed by the provider,
Council, and the supported person. From a random sample of individuals using
care services, it was found the majority had no tripartite agreement in place to
Item 7.
Page 49

Page 50

Appendix 2 
2
formalise their care arrangements. The audit found, through a documentation
review and discussions with social workers, examples where no referral had
been made to the SDS Team to finalise a tripartite agreement or where the
process still needed to be completed. The current workload pressures within
the Service are appreciated. 
• The Council does not charge individuals receiving a day care service. A review
of practices within other Local Authorities notes charging policies where
individuals contribute to the cost of receiving a day care service. The Council's
charging policy should be reviewed regarding day care and a decision should
be made as to whether a charge should be levied for the service in future.   
• Audit testing noted examples where supporting documentation concerning an
individual's care package was either not recorded or could not be found within
the CareFirst System. In addition, changes to care packages were noted
regarding the care delivered or the provider where again this was not reflected
within the CareFirst System. CareFirst is the primary database that records and
manages social care cases within Health & Social Care Moray. The limitations
of the CareFirst System are appreciated, highlighted in a separate audit review
in 2022/23. The Service has committed to investigate a replacement to the
current recording databases used within Health & Social Care Moray.   
Page 50

Page 51

Appendix 2 
3
Recommendations 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Key Control: Effective controls operate in the management and recording arrangements for the delivery of SDS Options 2 and 3
care packages   
5.01 In accordance with SDS
Regulations, evidence should
be maintained to document
the discussions held by social
workers regarding the various
care delivery options
discussed with the individual
using care services. 
High Yes Discussions
will be held by
Social Workers
as part of the
assessment
and recorded
as part of the
Support Plan
on Care First.
Team
Managers will
be accountable
to ensure
implementatio
n and delivery
through
supervision,
which will be
monitored and
reviewed at
Chief Social
Work Officer /
Head of
Service  
30/09/2023
Page 51

Page 52

Appendix 2 
4
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Practice
Governance
Board monthly.  
5.02 Documented procedures
should be developed to
support social workers and
individuals using care
services in the selecting of
SDS care delivery options. 
High Yes Relevant
Guidance will
be developed
and a process
map will be
distributed to
all Social
Workers. This
will be
monitored at
Practice
Governance
Board monthly. 
Chief Social
Work Officer /
Head of
Service  
31/03/2024
5.03 An annual reference
document detailing a
breakdown of the rates paid to
care providers should be
provided to all relevant
officers to assist in budgetary
High Yes A document
containing all
providers and
costs will be
issued to all
relevant
Provider
Services
Manager
30/06/2023
Page 52

Page 53

Appendix 2 
5
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
planning and the accurate
preparation of an individual's
support package.   
officers.
A process to
maintain and
update the
document
going forward
will be
developed and
monitored
through the
Practice
Governance
Board on a
regular basis. 
5.04 All officers should be
reminded to update the
CareFirst System to ensure
the database is up-to-date
and accurate for each
individual using care services. 
High Yes Discussions
will be held by
Social Workers
as part of the
assessment
and recorded
in the Support
Plan on Care
First. Team
Chief Social
Work Officer /
Head of
Service  
30/09/2023
Page 53

Page 54

Appendix 2 
6
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Managers will
be accountable
to ensure
implementatio
n and delivery
through
supervision,
which will be
monitored and
reviewed at
Practice
Governance
Board monthly.  
5.05 A tripartite agreement
between the individual using
the care service, Council and
care provider should be
agreed for all SDS Option 2
care packages. 
Medium Yes Social Workers
will refer to the
SDS Team
when setting
up a new
package and
this will be
reviewed and
monitored
through
Chief Social
Work Officer /
Head of
Service  
30/09/2024
Page 54

Page 55

Appendix 2 
7
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
supervision.
SDS Team to
then put in
place a
Tripartite
Agreement. 
This will be
monitored and
reviewed at the
Practice
Governance
Board
regularly. 
5.06 A contractual agreement
detailing service delivery and
costs should be agreed with
the 3 providers of day care
services noted within the
findings. 
High Yes Clarification
will be given
from SDS
Team and
Social Work as
to the direction
regarding
contractual
agreement. 
Provider
Services
Manager
31/03/2024
Page 55

Page 56

Appendix 2 
8
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
5.07 Annual support plan reviews
of individuals in receipt of
SDS Option 2 and 3 care
packages should be
undertaken in accordance
with agreed procedures. 
High Yes Work with
Social Work to
develop a
strategy to
ensure all
reviews are
completed on
time.
There is a
significant
capacity issue
across Social
Work.
This will be
monitored and
reviewed
regularly
through the
Practice
Governance
Board. 
Chief Social
Work Officer /
Head of
Service  
30/09/2024
Page 56

Page 57

Appendix 2 
9
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
5.08 Consideration should be
given for management to
undertake regular reviews of
the accuracy and recording of
the checks completed to
ensure the accuracy of
payments made to care
providers. 
Medium Yes Continuous
audit to be
implemented
through
Community
Care Finance.
Interim
Community
Care Finance
Officer
30/09/2023
5.09 The Council's charging policy
should be reviewed in regard
to day care and a decision
made as to whether a charge
should be levied for the
service in the future. 
High Yes Review the
Moray Council
charging policy
to allow the IJB
to make
recommendati
ons regarding
future
iterations. 
Interim Chief
Finance
Officer (MIJB) 
30/09/2023
5.10 A review of arrangements
regarding the authorisation of
individual care packages
should be undertaken.
Medium Yes Review the
current
authorisation
practice in line
with financial
Chief Social
Work Officer /
Head of
Service  
31/08/2023
Page 57

Page 58

Appendix 2 
10 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Thereafter, authorisation
requirements should be
documented and
communicated to all
appropriate officers.   
regulations.
Develop a
process map
highlighting
authorisation
levels for all
Social
Workers.
Monitor and
review through
the Practice
Governance
Board. 
Page 58

Page 59

Appendix 3 
AUDIT REPORT 23’024
BUCKIE HIGH SCHOOL   
Executive Summary  
The annual Internal Audit plan for 2022/23 provides for a review of a secondary school
as part of a rolling programme of audit visits within Education Services. This audit
details the findings from the audit review undertaken of Buckie High School as a start
of this rolling programme of visits planned for all secondary schools. 
The scope of this audit was to undertake a review of the Devolved School
Management Scheme in terms of the allocation of funding and the management of
these funds at school level. Consideration was given to how budgets are affected by
national, Council and School priorities. 
In addition to undertaking an overview of how the School develops, monitors and
controls its £4.8 million budget, the audit reviewed the management of the staffing
costs involved in delivering the curriculum. The audit checked that non payroll
expenditure complied with Financial Regulations and Procurement Guidelines. A
review was also undertaken to ensure appropriate accounting arrangements are
followed in managing school fund monies. This report sets out the work undertaken in
relation to the 2022/23 financial year.  
Testing found Buckie High School to be well managed with a good appreciation of
policies, procedures and financial management processes. However, consideration
should be given to the following:- 
• It was noted a register of electrical items is maintained, but not of other types
of equipment held at the School. Council Financial Regulations require a
comprehensive record of all moveable items with an individual replacement
cost of over £500. 
• A review of school fund records noted effective management arrangements,
however consideration should be given to implementing further improvements
in the monthly bank reconciliation exercise. This includes the “writing back” of
uncashed cheques over 6 months old. 
Item 7.
Page 59

Page 60

Appendix 3 
Recommendations 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Key Control: Listings of equipment held by the School are kept up-to-date and secure with physical items appropriately identified.   
5.01 An inventory record should be
developed of all moveable items
with a value over £500.
Thereafter a copy of this record
should be saved off site. 
Medium Yes Financial
Regulation
compliant
inventory
record to be
developed.
Copy to be
held off site.
Business
Support Officer
30/06/2023 
Key Control: School Funds are administered in compliance with the School Fund Regulations. 
5.02 Monthly school fund
reconciliation records should
include a requirement for the
“writing back” of uncashed
cheques over 6 months old. In
addition, correcting adjustments
noted within the school fund
Low Yes School Fund
Procedures be
amended.
Business
Support Officer      
30/08/2023 
Page 60

Page 61

Appendix 3 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
cashbook should also be
amended.   
5.03 Supporting documentation to
evidence income and
expenditure transactions should
be held with the central School
Fund records.   
Low Yes Supporting
documentation
relating to
School fund
income and
expenditure
now held with
central School
Fund records.
Business
Support Officer 
Implemented 
Page 61

Page 62

Page 62

Page 63

Appendix 4 
AUDIT REPORT 23’023
ENVIRONMENTAL & COMMERCIAL SERVICES STORES   
Executive Summary  
The annual Internal Audit plan for 2022/23 provided for a review to be undertaken of
the Environmental & Commercial Services Stores. The stores is located at the
Ashgrove Depot in Elgin and includes both internal and external storage facilities. This
is the primary storage facilities for meeting the needs of Roads, Cleaning and Fleet
Services. In addition, the stores is also responsible for the purchase and issue of
approved clothing for all Council Services. The stores system has 1225 lines of
individual stock items, which can vary in value from a few pounds to upwards of
£1,000. Approximately £1.2 million of stock items were issued from stores in 2022/23.  
The audit used the Chartered Institute of Public Finance Accountants audit programme
to review the systems and controls in managing stock held within Stores. The Service
uses a software application called Tranman for administering the stores system.
Testing also included a review of the security arrangements to safeguard against
unauthorised access to the storage areas. 
The audit was carried out in accordance with Public Sector Internal Audit Standards
(PSIAS). 
Overall the audit found the stores system to be effectively managed. However, the
review has highlighted the following areas for consideration: 
• It was noted that Tranman has functions and reporting facilities to assist in the
effective management of a stores system. However, it was found that no
minimum or maximum stock figures have been set against each stock item. The
maintenance of stock levels at the appropriate levels is important to ensure the
cost effective and efficient delivery of the Service.  
• It was found that no review to highlight slow moving stock within stores had
been undertaken for a number of years. It is appreciated that over the last few
years the restrictions to systems and practices due to the pandemic. However,
in accordance with good stock management arrangements, a review should
now be undertaken of slow moving stock and consideration should be
undertaken to whether these items should be sold or disposed. 
• As part of the audit review, testing was undertaken to verify the average price
stock valuation used within Tranman. The majority of individual stock valuations
tested were found to be correct. However, it was noted that a minor costing
Item 7.
Page 63

Page 64

Appendix 4 
error occurred when stock items were received and items issued before a
revised price was recorded within Tranman. Analysis found that the materiality
of the error is low, but revised procedures have now been amended and the
software supplier of Tranman advised to develop a solution to resolve the issue. 
Page 64

Page 65

Appendix 4 
Recommendations 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Key Control:   Effective systems and procedures are operating to ensure accurate records are maintained to account for all stocks
held within Environmental & Commercial Services Stores. 
5.01 A review should be undertaken
of the items stored within the
external storage compound and
consideration should be given to
whether any items could be
stored within the internal storage
facility for improved security.
This includes the copper coil
identified during the audit review. 
Medium Yes High value
items including
copper coil will
be moved
within a secure
building.
Fleet Business
Co-ordinator 
30/06/2023
5.02 All materials and equipment
recorded within Tranman should
be updated with minimum and
maximum stock levels. This
should assist in more effective
management of stock levels at
the appropriate levels. 
Medium Yes Minimum and
maximum
stock levels will
be set on the
Tranman
system.
Fleet Business
Co-ordinator
31/12/2023
Page 65

Page 66

Appendix 4 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
5.03 Adjustments required to stock
figures recorded within Tranman
should require the authorisation
of the Fleet Business Co-
ordinator. 
Medium Yes Procedure to
be amended to
ensure that
adjustments to
Tranman Stock
levels are
authorised by
management.
Fleet Business
Co-ordinator
Implemented. 
5.04 Road materials held within the
vehicle storage area should be
stored more securely with
access restricted to authorised
officers.   
Medium Yes A secure area
has been
created within
the roads
department
storage
building. Only
Stores staff
have access to
this.
Fleet Business
Co-ordinator
Implemented.
5.05 Current procedures should be
amended to ensure that changes
to framework contract prices of
stock items are regularly
updated within Tranman. 
Medium Yes Suppliers will
be contacted 
to  provide
changes in
prices.
Tranman will
Fleet Business
Co-ordinator
30/06/2023
Page 66

Page 67

Appendix 4 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
then be
updated.
5.06 Regular reviews should be
undertaken of stores to highlight
any slow moving or obsolete
stock. Consideration should then
be undertaken as to whether any
identified items are sold or
disposed. 
Medium Yes An exercise
has now begun
to identify
areas of slow
moving or
obsolete stock
and where
required sale
or disposal will
be arranged.
Fleet Business
Co-ordinator
30/09/2023
5.07 Requisition notes should only be
accepted if completed in full with
the individual requesting an item
detailing their name, signature
and service.   
Low Yes Reminder
given to staff to
ensure that
requisition
notes are fully
completed on
all occasions.
This will be
monitored on a
regular basis.
Fleet Business
Co-ordinator
On Going 
Page 67

Page 68

Page 68