Audit and Scrutiny Committee 
Wednesday, 10 May 2023 
NOTICE IS HEREBY GIVEN that a Meeting of the Audit and Scrutiny Committee
is to be held at Council Chambers, Council Office, High Street, Elgin, IV30 1BX
on Wednesday, 10 May 2023 at 09:30. 
BUSINESS 
1. Sederunt 
2. Declaration of Group Decisions and Members Interests * 
3. Minute of the Meeting of the Audit and Scrutiny
Committee of 15 February 2023
5 - 6
4. Written Questions ** 
5. Internal Audit Section Completed Projects
Report by Audit and Risk Manager
7 - 48
6. Internal Audit Section Update
Report by Audit and Risk Manager
49 - 74
7. Annual External Audit Plan Year Ending 2022-23
Report by Depute Chief Executive (Economy, Environment and
Finance)
75 -
154
8. Question Time ***
Consider any oral question on matters delegated to the Committee in
terms of the Council's Scheme of Administration. 
Page 1

Page 2

Summary of Audit and Scrutiny Committee functions:
Audit Functions - Consider reports from the Council's internal auditor
& Audit Scotland concerning Council Functions.
Scrutiny Functions - Scrutinising the policies of the Council and their
effectiveness in meeting the action plans of the Council as set out in
the Corporate Development Plan and evaluating the actions of
Committees in implementing the action plans set out in the Corporate
Development Plan.
Performance Monitoring - To receive reports on the performance of
and trends within all of the Council’s services in terms of service
standards and performance information.
Standards - To ensure that the highest standards of probity and public
accountability are demonstrated.     
Page 2

Page 3

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how
the individual or members of the group will vote on any item(s) of business on
the Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any
relevant and competent business within the specified remits not already on the
agenda, to the Chair provided it is received by the Proper Officer or Committee
Services by 12 noon two working days prior to the day of the meeting.  A copy
of any written answer provided by the Chair will be tabled at the start of the
relevant section of the meeting.  The Member who has put the question may,
after the answer has been given, ask one supplementary question directly
related to the subject matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the
consent of the Chair. If a Member does not have the opportunity to put a
supplementary question because no time remains, then he or she can submit it
in writing to the Proper Officer who will arrange for a written answer to be
provided within 7 working days. 
*** Question Time - At each ordinary meeting of the Committee ten minutes will be
allowed for Members questions when any Member of the Committee can put a
question to the Chair on any business within the remit of that Section of the
Committee.  The Member who has put the question may, after the answer has
been given, ask one supplementary question directly related to the subject
matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than ten minutes
after the Committee has started on the relevant item of business, except with
the consent of the Chair.  If a Member does not have the opportunity to put a
supplementary question because no time remains, then he/she can submit it in
writing to the proper officer who will arrange for a written answer to be provided
within seven working days. 
Page 3

Page 4

THE MORAY COUNCIL 
Audit and Scrutiny Committee 
SEDERUNT 
Councillor Graham Leadbitter  (Chair)
Councillor Shona Morrison  (Depute Chair)  
Councillor Peter Bloomfield  (Member)
Councillor Theresa Coull  (Member)
Councillor John Cowe  (Member)
Councillor John Divers  (Member)
Councillor Amber Dunbar  (Member)
Councillor Jérémie Fernandes  (Member)
Councillor Donald Gatt  (Member)
Councillor David Gordon  (Member)
Councillor Sandy Keith  (Member)
Councillor Marc Macrae  (Member)
Councillor Neil McLennan  (Member)
Councillor John Stuart  (Member)  
Mr Ivan Augustus  (Non-Voting Member)
Ms Margaret Wilson  (Non-Voting Member)
Clerk Name: Lindsey Robinson
Clerk Telephone: 07966 120593
Clerk Email: committee.services@moray.gov.uk 
Page 4

Page 5

MORAY COUNCIL 
Minute of Meeting of the Audit and Scrutiny Committee 
Wednesday, 15 February 2023 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor Peter Bloomfield, Councillor Tracy Colyer, Councillor Theresa Coull,
Councillor John Divers, Councillor Amber Dunbar, Councillor Jérémie Fernandes,
Councillor Donald Gatt, Councillor David Gordon, Councillor Sandy Keith, Councillor
Graham Leadbitter, Councillor Neil McLennan, Councillor Shona Morrison,
Councillor John Stuart 
APOLOGIES 
Councillor John Cowe 
IN ATTENDANCE 
Also in attendance at the above meeting were the Chief Executive, Head of
Governance, Strategy and Performance, Audit and Risk Manager, and Lindsey
Robinson, Committee Services Officer as clerk to the meeting. 
1.         Chair 
Councillor Graham Leadbitter, as Chair of the Audit and Scrutiny Committee,
chaired the meeting. 
2.         Declaration of Group Decisions and Members Interests * 
In terms of Standing Order 21 and the Councillors' Code of Conduct, there were no
declarations from Group Leaders or Spokespersons in regard to any prior decisions
taken on how Members will vote on any item on the agenda or any declarations of
Member's interests in respect of any item on the agenda. 
3.         Minute of the Meeting of the Audit and Scrutiny Committee of 23
November 2022 
The minute of the meeting of the Audit and Scrutiny Committee dated 23 November
2022 was submitted and approved. 
4.         Written Questions ** 
The Committee noted that no written questions had been submitted. 
5.         Internal Audit Plan - Year Ending 31 March 2024 
A report by the Audit and Risk Manager provided the Committee with the details of
the planned internal audit coverage for the year ending 31 March 2024. 
Item 3.
Page 5

Page 6

Following consideration, the Committee agreed to note the proposed Internal Audit
coverage for the 2023/24 financial year.  
6.         Internal Audit Section Update 
A report by the Audit and Risk Manager provided the Committee with an update on
the work of the Internal Audit Section. 
During consideration the Audit and Risk Manager advised the Committee that the
audit of ICT Hardware Asset Management would be carried forward due to the
inclusion of the Aberlour Nursery Project. 
Thereafter, the Committee agreed to note the contents of the report. 
7.         Internal Audit Section - Completed Projects 
A report by the Audit and Risk Manager advised the Committee on the work of the
Internal Audit Section for the period from 24 November 2022 to 15 February 2023. 
Following consideration, the Committee agreed to note the contents of the report.  
8.         Local Government Benchmarking Framework 2020-21 Results 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) presented the Committee with a corporate overview of
benchmarking performance data for the period 2020-21. 
Councillor McLennan entered the meeting during the discussion of this item. 
Following consideration, the Committee agreed to note the Council's performance in
terms of a corporate overview of benchmarking results. 
9.         Question Time *** 
The Committee noted that no questions were asked. 
Page 6

Page 7

REPORT TO:    AUDIT AND SCRUTINY COMMITTEE ON 10 MAY 2023 
SUBJECT: INTERNAL AUDIT SECTION – COMPLETED PROJECTS
REPORT 
BY: AUDIT AND RISK MANAGER 
1. REASON FOR REPORT 
1.1 The report advises Committee on the work of the Internal Audit Section for the
period from 16 February 2023 to 10 May 2023. 
1.2 This report is submitted to Committee in terms of Section III (2) and (7) of the
Council’s Scheme of Administration relating to consideration of reports from
the Council’s Internal Auditor and monitoring delivery of the audit service
carried out by Internal Audit. 
2. RECOMMENDATION 
2.1 That Committee consider the contents of this report, seeks clarification
on any points noted and otherwise notes the report. 
3. BACKGROUND 
3.1 This report provides details of the following internal audit work concluded
during the period 16 February 2023 to 10 May 2023: 
Domestic Refuse Disposal 
3.2 An audit review of the arrangements for collecting refuse materials from
domestic properties was undertaken. Moray Council collects refuse at
approximately 46,000 domestic properties at the cost of £3.1 million annually.
Systems were reviewed to ensure the most effective and efficient use is made
of resources in collecting domestic waste. The audit also checked the
procedures for disposing of recyclable waste. The executive summary detailing
the findings and recommendations for this project are given in Appendix 1. 
Item 5.
Page 7

Page 8

Building Services - Planned Maintenance Projects 
3.3 An audit of systems and procedures in managing Planned Maintenance
Projects within Building Services was undertaken. The total budget for 2022/23
amounted to approximately £5 million and included the works undertaken for
the replacement of bathrooms, kitchens, central heating systems and disability
adaptations. 
3.4 The audit scope involved an overview of how the annual planned maintenance
programme is determined and the contract management arrangements of
projects undertaken by Building Services. The audit selected a random
selection of projects to verify costs to supporting documentation and
compliance with contract conditions and regulations. In addition, due to a
special investigation previously reported concerning overtime claimed by
officers, further testing was also undertaken into the management of overtime
payments. The executive summary detailing the findings and recommendations
for this project are given in Appendix 2. 
European Social Fund
3.5 An audit was undertaken of the monies received from European Social
Funding. The European Social Fund is administered by the Scottish
Government with the objective of improving employment, education and
supporting the most vulnerable people at risk of poverty. The Council secured
approximately £1.1 million over 4 years in Phase 2 European Social Funding
to deliver a Poverty & Social Inclusion programme that provides free
confidential help and advice to people with money, debt or benefit problems.
The audit reviewed the governance and administrative arrangements
established to support the delivery of the Poverty & Social Inclusion
programme and complies with the conditions of the funding agreement. Overall
effective management arrangements were found. The executive summary for
this project is given in Appendix 3. 
Aberlour Early Years Learning & Childcare Scheme
3.6 An audit has been undertaken into the contract management arrangements for
refurbishing Aberlour's early years and childcare nurseries. In Aberlour, the
early years and childcare service is delivered by private and council nurseries
operating from the same premises. The review was requested after concerns
were raised by elected members regarding the management of this scheme.
The agreed scope for the audit was to review the reporting arrangements and
compliance with Financial Regulations, Procurement Guidelines and the
Conditions of the Contract for the refurbishment of the Aberlour early years
learning and childcare premises. As this review was undertaken due to specific
concerns raised, it is considered that the full report detailing all the findings
from the audit undertaken should be provided. The audit report is given
in Appendix 4.  
Page 8

Page 9

4 SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan
(LOIP))
Internal audit work supports good governance and the delivery of
efficient services. 
(b) Policy and Legal
No implications. 
(c) Financial Implications
No implications directly arising from this report. 
(d) Risk Implications
The independent review of selected systems and procedures mitigates
the risks associated with inadequate or ineffective control procedures. 
(e) Staffing Implications
No implications. 
(f) Property
No implications. 
(g) Equalities/ Socio Economic Impacts
No implications. 
(h) Climate Change and Biodiversity Impacts
No implications. 
(i) Consultations
There have been no direct consultations during the preparation of this
report. 
At its meeting on 27 April 2023, the Corporate Management Team
(CMT) considered the Internal Audit report on the Aberlour Early
Years’ Learning and Childcare along with the wider End of Project
Report which reported on the overall £55m Early Years Expansion
Programme in Moray, of which the Aberlour project was the final part. 
CMT noted the comprehensive end of project report (see background
documents as listed) and the overall success of the programme to
expand funded early learning and childcare hours from 600 to 1140
for vulnerable 2s and 3-4 year olds by August 2021. CMT
acknowledged that the expansion project was completed during the
period of the pandemic which created a more challenging operating
environment for the delivery of the new statutory requirement.  As
part of this, the Aberlour expansion to 1140 hours was due to be
delivered in August 2021, which was the focus for the project team at
that time.  There are a number of learning points within the report and
CMT were pleased to note that these are being taken forward to
inform future work.  
Page 9

Page 10

CMT also considered the Internal Audit report and sought clarification
from the Internal Auditor on various points regarding the contract
management arrangements for the Aberlour project.  CMT noted that
there are a number of recommendations within the report and were
supportive of the action identified to address these.  In addition, CMT
noted that since the original proposal for temporary units, a range of
options had been assessed and considered in developing alternative
approaches for the delivery of the decant for the project but that the
project had not yet moved to the delivery phase as costings remain
outstanding, which may require further consideration of options in a
context of rising costs.   
CMT would wish to ensure that the contractual arrangements are
robust ahead of project construction commencing to reflect the points
set out in the Audit report and will ensure this is taken forward by
relevant officers.   
CMT also agreed with the Audit recommendation for an urgent
resolution to the future use of the temporary units and noted that this
is currently part of wider considerations related to the ELC service
due to be brought to the council before the summer recess and which
will enable a decision on alternative use or sale at that point.   
5 CONCLUSION 
5.1 This report provides Committee with a summary of findings arising
from an audit project completed during the review period. 
Author of Report:       Dafydd Lewis, Audit and Risk Manager
Background Papers:  Internal audit files 
15-0019 Early Learning Childcare - End of Project Report
Appendix 1 - Delivery_Plan_Sep_2017
Appendix 2 – Grant Award Thank You from Torridon Education
Group
Appendix 3 - Care Inspectorate Grading Data Compared August
2017 and June 2022
Appendix 4 - Worked Example Hourly Rate
Appendix 5 - RADIC Log
Appendix 6 - Moray Council ELC Internal Audit Report 
Ref:                            SPMAN-1042990102 -145                                          
Page 10

Page 11

Appendix 1
AUDIT REPORT 23’016
DOMESTIC REFUSE COLLECTION 
Executive Summary 
The annual audit plan for 2022/23 provides for an audit review to be undertaken of the
arrangements for the collection of refuse materials from domestic properties. Local
Authorities have a statutory duty to provide this service in accordance with the
Environmental Protection Act 1990. Moray Council collects refuse at approximately
46,000 domestic properties at the cost of £3.1 million per annum. 
The scope of this audit was to review systems and procedures to ensure the most
effective and efficient use of resources is made for collecting domestic waste. The
audit also reviewed the arrangements for disposing of recyclable waste with analysis
of the Financial Management System noting this was provided at a cost in excess of
£880,000 per annum. This included disposal of plastic, glass and biodegradable
waste, in addition to paper / card, aluminium and steel cans for which the Council
receives regular payments from recycling contractors. 
The audit was carried out in accordance with Public Sector Internal Audit Standards
(PSIAS). 
The areas identified for management attention include the following :- 
• Incorrect accounting was noted in the treatment of Value Added Tax (VAT). The
audit found that no VAT had been declared to HM Revenue and Customs
(HMRC) for income received from the recycling of paper since September 2020.
This amounted to £85,284 of VAT, which requires a disclosure notice and an
expected interest penalty charge payable to HMRC. The service has been
advised of the documentation that should be provided to the Payments Section
to ensure the future proper accounting for VAT.   
• The Council has an agreement with a contractor for the recycling of plastic. The
audit noted there was an expectation this would generate income for the
Council from regular payments made by the contractor for the plastic provided
for recycling. Unfortunately, the Council has received no payment due to quality
issues in plastics submitted. A review should be undertaken of current systems
for the recycling of plastic to determine whether improvements can be made to
existing operations. 
• The Council receives payments from the aluminium and steel cans provided to
a recycling contractor. However, it was found there is no contractual agreement
between the Council and this recycling contractor for cans disposal. The service
should formalise these arrangements.   
Item 5.
Page 11

Page 12

Appendix 1
Recommendations 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Key Control: Service operations are planned to achieve best value principles. 
5.01 Consideration should be
given to exploring software
applications that could assist
the process and provide value
for money opportunities in the
determination of operational
routes and the resources
required. 
Low Yes As a service we
have made initial
enquiries with
suppliers of route
optimisation
software and have
received one
demonstration
with another
booked for
January.
Following this we
will review to
confirm the best
value for money
option. We will
liaise with Head of
Service to
determine
feasibility against
budget
constraints. 
Waste
Manager
31/05/2023
Key Control: Staffing requirements are carefully assessed based on operational needs and payments made to staff are appropriately
controlled. 
5.02 Documented business
continuity plans should be
agreed to ensure continuous
delivery of services in the
Medium Yes The service has
been liaising with
the Business
Continuity & Risk
Management
Waste
Manager
31/01/2023
Page 12

Page 13

Appendix 1
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
event of any disruption in
meeting operational
requirements. 
Officer and has
drafted an initial
business
continuity plan.
This was returned
after review on
23/11/22 for
further
considerations. 
5.03 Officers should be reminded
to ensure timesheets are
carefully checked prior to
authorisation, and supporting
documentation is completed
accurately before being
passed to the payroll service
for payment. 
Medium Yes Team Leaders
have advised all
staff of the need to
fully complete
timesheets with all
relevant
information.
Process has been
reviewed and
timesheets are
being checked by
Waste Operations
Officer before
forward to Admin
where there is a
double check of
the timesheet
summary for
Payroll.
Accountancy now
have sight of
Payroll data
submissions to
check assigned
cost centres. 
Waste
Manager
Implemented
Page 13

Page 14

Appendix 1
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Key Control: Vehicle costs borne by the service are accurately calculated and allocated based on service requirements and resource planning.
5.04 Consideration should be
given to the apportionment of
vehicle and transport costs to
the green waste collection
cost centre to enable further
budgetary control of all
elements of the domestic
refuse collection service. 
Low Yes Historically the
same vehicles
were used for
residual waste and
biowaste on a
weekly rotation.
Since
implementation of
alternative
collection
frequencies
vehicles are
assigned to
collection of
biowaste therefore
specific vehicle
costings will be
allocated to green
waste budget
lines. 
Waste
Manager
31/01/2023
Key Control: Disposal of recyclable materials collected from kerbside is controlled by formalised contractual arrangements with approved
external contractors and all payments made in line with contractual terms. 
5.05 Management should review
current arrangements for
plastic recycling to determine
whether improvements can
be made to decrease haulage
costs and achieve higher
quality submissions that could
Medium Yes Quality
considerations /
standards have
changed within the
industry since tender
and complexities
also exist in the
operation of the
Materials Recovery
Facility by a third
sector organisation.
Waste
Manager
31/01/2024
Page 14

Page 15

Appendix 1
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
generate additional income
for the Council. 
The national Deposit
& Return Scheme
(DRS) will be live
from 16/8/23 and is
expected to capture
up to 90% of the
materials currently
processed. The early
impact of DRS will be
evaluated and a
review of plastic
recycling
arrangements then
undertaken. 
5.06 A contract should be agreed
between the Council and a
third sector organisation for
providing a rediverting and
recycling of waste service.
The agreement should
include the rates payable and
service specification.   
Low Yes Agree there is a
general lack of
formal
documentation
between the
Council and third
sector
organisation to
determine
appropriate
diversion rates.
This will need to
be taken forward
with support from
Procurement
colleagues, with
either a contract or
service level
agreement to be
implemented. 
Waste
Manager
30/04/2023
Page 15

Page 16

Appendix 1
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
5.07 Supporting documentation
should be provided of VAT
applicable income received
by the Service to the
Payments Section to ensure
proper accounting
arrangements can be
followed in compliance with
HMRC regulations.   
High Yes This has now been
resolved with self-
billing invoices
being sent to
Payments on
receipt to ensure
VAT is accounted
for. Payments
have now received
all outstanding
self-billing
invoices and have
processed the
required VAT
adjustments. 
Waste
Manager
Implemented
5.08 Documented agreement
should be undertaken to
formalise arrangements for
recycling aluminium and steel
cans.   
Medium Yes Discussion has
taken place
between Council
and the current
reprocessor with a
view to formalise
arrangements
through an
extension of the
terms of the Dry
Mixed Recyclates
contract. Options
will be reviewed
with Procurement
colleagues whilst
being mindful of
the imminent
implications of the
introduction of the
Waste
Manager
30/04/2023
Page 16

Page 17

Appendix 1
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Deposit & Return
Scheme. 
Page 17

Page 18

Page 18

Page 19

Appendix 2
AUDIT REPORT 23’017
BUILDING SERVICES - PLANNED MAINTENANCE PROJECTS   
Executive Summary 
The annual audit plan for 2022/23 provided for a review of Planned Maintenance
Projects undertaken by Building Services. The total budget for 2022/23 amounted to
approximately £5 million and included the works undertaken for the replacement of
bathrooms, kitchens, central heating systems and disabled adaptations. A planned
maintenance programme of projects to be undertaken is agreed annually between
Property and Building Services. It was noted that service delivery, including
performance management is administered through a Partnership Agreement. 
The audit scope involved an overview of how the annual planned maintenance
programme is determined and the contract management arrangements of projects
undertaken by Building Services. The audit involved a random selection of projects to
verify costs to supporting documentation and compliance with contract conditions and
regulations. Additional testing was also undertaken of the systems regarding the
management and control of overtime paid to officers. This was due to a special
investigation undertaken of the overtime claims made by two officers within Building
Services. The audit concerned the overtime paid to these officers and whether the
individuals had actually undertaken the work claimed. The findings of this investigation
have been reported separately to the Building Services Manager.  
The audit was carried out in accordance with Public Sector Internal Audit Standards
(PSIAS).  
The audit review has highlighted the following areas for improvement:- 
• It is pleasing to note that Building Services monitor planned maintenance
performance through internally agreed targets and participation in Association
for Public Service Excellence (APSE) benchmarking exercises with other Local
Authorities. However, consideration should also be given to developing
performance targets for the completion of works from comparisons or
benchmarking with the private sector. 
• It was found that budgetary and actual costs of planned works are calculated
from established costing arrangements. The audit noted the basis for
determining the annual percentage increases in estimated costs for the planned
maintenance programme is based on a costing exercise undertaken in 2019.
In addition, the actual costs for works completed use percentage uplift rates for
the recovery of overtime, overheads and use of sub-contractors. Costing rates
should be reviewed to ensure increases provide greater transparency and
supports more accurate performance data of the actual costs of the works
undertaken.   
Item 5.
Page 19

Page 20

Appendix 2
• A review of the system for authorising and recording overtime paid to officers
highlighted further improvements to current administrative arrangements. Audit
testing found overtime claims had not been correctly approved or a clear audit
trail maintained detailing the specific job number or reason for authoring the
additional hours. 
Page 20

Page 21

Appendix 2
Recommendations 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Key Control: Planned maintenance works are managed in accordance with contract, procurement and financial regulations.   
5.01 A review should be undertaken
of the revised working time
arrangements for craft and
manual officers agreed at a
meeting of the Communities
Committee on 22 October 2013
(para. 21 of the minute refers). If
the benefits of these changes to
core hours and shift patterns
remain, an agreement should be
sought to continue with current
arrangements. 
Medium Yes Survey of staff
to be carried
out and report
of findings to be
consulted with
staff and Trade
Unions, to
determine if
current shifts
should remain.
Building
Services
Manager
30/09/2023
5.02 Consideration should also be
given in developing performance
targets for the time taken to
complete works from
comparisons or benchmarking
with the private sector. 
Medium Yes Benchmarking 
to be carried
out  by
Property QS
team to
compare DLO
performance in
relation to
external
contractors.
Principal
Quantity
Surveyor
31/03/2024
Page 21

Page 22

Appendix 2
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation 
5.03 A review should be undertaken
of the rates used and accounting
arrangements for determining
budgets and recovery of costs of
planned maintenance works.   
Medium Yes Planned
Maintenance
recharge rates
to be reviewed,
as well as
overhead
allocation. 
Building
Services
Manager
31/03/2024
5.04 Procedures should be
developed to allow the recording
and monitoring of the metal
collected for recycling. 
Low Yes Written
procedure to be
developed for
all waste
handling,
including
disposal of
scrap.
Building
Services
Manager
31/05/2023
5.05 Officers should be reminded of
the Council’s Retention
Schedule to ensure all have a
clear understanding of the time
periods regarding the retention
of records. 
Low Yes Retention
schedules to
be reviewed
for all paper
stores issue
tickets.as part
of developing
paperless
Building
Services
Manager
30/06/2023
Page 22

Page 23

Appendix 2
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
stock issues
on new
Datastox
system.
5.06 Officer timesheets should be
amended to allow any overtime
undertaken to be recorded
against a specific job number. 
In accordance with agreed
operating arrangements,
officers’ timesheets must be
authorised by a supervisor and a
co-ordinator. 
Medium 
Medium
Yes 
Yes 
Timesheets
now reviewed
and agreed
with Internal
Audit and
Payroll to
capture this
information. 
(ICT working
on developing
automatic
timesheet
recording via
hand held
devices). 
Building
Services
Manager
31/03/2023
5.07 The use Ctrack system should
be investigated as an aid to allow
the monitoring of officers
timesheets of the working time
charged to jobs. 
Medium Yes  C-Track reports
now being
generated and
issued to
relevant
officers weekly.
A monthly
Building
Services
Manager
31/03/2023
Page 23

Page 24

Appendix 2
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
timesheet audit
also now
carried out of
high overtime
claims against
C-Track
records.
(A Council
wide  Safe
Driving and
Vehicle
Location Policy
is being
developed).
5.08 All Clerk of Works Instructions
should be recorded detailing the
requirement for any additional
work needed within planned
works. 
Medium Yes DLO
Procedures in
place to record
variations
should be used
by all relevant
staff. Refresher
Training on this
to take place
with relevant
officers.  
Building
Services
Manager 
30/06/2023
5.09 Contracts should be agreed with
companies used regularly for the
supply of goods and materials
Medium Yes  Annual spend
will be
Building
Services
Manager 
31/03/2024
Page 24

Page 25

Appendix 2
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
where annual expenditure
exceeds the Quick Quote
threshold of £5000.
reviewed after
financial year
end  31 March
2023 and all
off contract
spend
highlighted as
part of
Departmental
Procurement
Plan (DPAP)
2023/24. 
Page 25

Page 26

Page 26

Page 27

Appendix 3
AUDIT REPORT 23’022 
EUROPEAN SOCIAL FUND 
Executive Summary 
The Annual Audit Plan for 2022/23 provides for a review of monies received from
European Social Funding. The European Social Fund is administered by the Scottish
Government with the objective of improving employment, education and supporting the
most vulnerable people at risk of poverty. The Council successfully secured
approximately £1.1 million over 4 years in Phase 2 European Social Funding to deliver a
Poverty & Social Inclusion programme that provides free confidential help and advice to
people with money, debt or benefit problems. 
The scope of this audit was to provide assurance that effective governance and
administrative arrangements had been established to support the delivery of the Poverty
& Social Inclusion programme and complies with the conditions of the funding agreement.
The programme provided funding for Council Money Advice and Income Maximisation
Projects and a Challenge Fund accessed by two External Partners to deliver the
programme to a broader community. It was noted that 20% match funding was required
to be provided by the Council and External Partners to deliver the overall programme. 
The audit was carried out in accordance with Public Sector Internal Audit Standards
(PSIAS). 
The audit noted the following points in the administration of the Scheme:- 
• Supporting records were verified to prove the costs claimed within previous grant
claims submitted to the Scottish Government. This expenditure was related to the
staffing costs of officers dedicated to programme delivery. At the time of the audit
£349,000 of funding has been received and £438,000 is awaiting verification by
the Scottish Government. There is no indication of any issues with the outstanding
claim; however the final outturn and claim figures will not be known until project
cessation on 31st March 2023. Current estimates indicate a small underspend on
the overall grant allocation of approximately £45,000 due to staffing vacancies and
ineligible employee sickness costs over the 4 years of the programme. 
• Conditions of the funding agreement required the Council and External Partners
to deliver support in excess of 1,800 poverty affected households with the objective
of improving financial skills, removing debt barriers to social inclusion and
encouraging employment, training and education. It was found these target levels
of participation have not been achieved, with the Council led programme at the
time of audit reporting participant registration at 65% of the target level, and
Challenge Fund partners, who received their funding awards at a later date,
reporting a combined average of 61% participation compared to the target. The
Item 5.
Page 27

Page 28

Appendix 3
terms of the funding agreement detail financial penalties based on a percentage
charge of the funding award depending on achieved participation levels. However,
no penalty is applied if 65% of targets set are achieved. The Council has recently
submitted a change request to the Scottish Government seeking a reduction of
15% in the target level for the Challenge Fund and at the time of the audit review,
a response was awaited. Clients continue to be worked with to maximise
participation levels by project end in March 2023. 
Page 28

Page 29

Appendix 4
Moray Council
Internal Audit Section 
1
Aberlour Early Years Learning &
Childcare Scheme
Final Report  
Item 5.
Page 29

Page 30

Appendix 4
Moray Council
Internal Audit Section 
2
DEPARTMENT: Education, Communities & Organisational Development 
SUBJECT:  Aberlour Early Years Learning & Childcare Scheme 
REPORT REF: 23’014 
Table of Contents 
Section No   Section Title 
1   Executive Summary 
2   Introduction 
3   Audit Scope 
4   Summary Assessment 
5   Findings 
6   Recommendations
Page 30

Page 31

Appendix 4
Moray Council
Internal Audit Section 
3
1. Executive Summary  
An audit has been undertaken into the operational management arrangements for the
refurbishment of Aberlour early years learning and childcare premises. The review
was requested by the Depute Chief Executive (Education, Communities &
Organisational Development) after concerns were raised by elected members
regarding the scheme. In Aberlour, the early years and childcare service is delivered
by private and council nurseries; both operate from the same premises.
The Children and Young People (Scotland) Act 2014 introduced a statutory duty for
Local Authorities to provide funded places for all eligible children. In order to achieve
this requirement, a contract was awarded in 2018 for the construction and
refurbishment of various premises to meet this expansion programme. The
refurbishment of Aberlour early years learning and childcare premises is part of this
larger contract and was managed by a Senior Projects Officer and thereafter by the
Early Years’ Service Manager in consultation with Property Services. In addition,
progress was regularly reviewed by the Early Years Learning Expansion Programme
Board, which included representation of senior officers across various services. 
However, since May 2022, the responsibilities of the Early Learning Expansion
Programme Board have been transferred to the Transforming Education Project
Board, with additional reporting to the Transform Learning Board. This is consistent
with established project management arrangements detailed within the Council’s
Project Management Governance Policy.  
The scope of the audit was to undertake an overview of the reporting arrangements
and compliance with Financial Regulations, Procurement Guidelines and the
Conditions of the Contract for the refurbishment of the Aberlour early years learning
and childcare premises. However, it should be noted the refurbishment works are yet
to start. The audit findings should be viewed with consideration of the extraordinary
challenges faced by officers during the pandemic. In addition, it was also found that
key officers involved in the management of the scheme have moved to other posts or
are no longer employed by the Council.
The audit was carried out in accordance with Public Sector Internal Audit Standards
(PSIAS).
The review has highlighted the following areas for consideration: 
Page 31

Page 32

Appendix 4
Moray Council
Internal Audit Section 
4
• The refurbishment of Aberlour early years learning childcare premises was
initially intended to be undertaken in August 2020. However, due to issues
concerning the pandemic the date for the planned refurbishment works was
deferred from 2020 to 2021. In early 2021 a decision was made to purchase
temporary cabins as the preferred option for providing temporary
accommodation to the children and staff of both nurseries. A temporary cabin
was to be located at Speyside High School and another at Aberlour Primary
School. These proposals were reported to the Education, Communities and
Organisational Development Committee on 11 August 2021. The cost of
purchasing the temporary cabins was £234,860.  However, after discussions
with officers and a review of supporting documentation, the audit found that
later in 2021 and early 2022, concerns were raised regarding increases in
construction costs and the location of a temporary cabin. This provided an
opportunity to review alternative temporary accommodation provision to ensure
moving forward that consideration was given to the most cost effective option.
A report to the Education, Children’s and Leisure Services Committee on 24
August 2022 noted a revised proposal to locate one temporary cabin at the
Aberlour Primary School and outdoor units near the park at Aberlour.  Concerns
were raised regarding this option, as detailed in a report to the Education,
Children's and Leisure Services Committee on 2 November 2022. A further
review was then undertaken with a report to the Education, Children's and
Leisure Services Committee on 14 December 2022 that agreed for the Depute
Chief Executive (Education, Communities & Organisational Development) to
investigate other temporary accommodation options. The audit considers that
appropriate reporting has been undertaken to update elected members on
progress regarding the refurbishment of the Aberlour early years learning and
childcare premises. Required changes to the delivery of temporary
accommodation to allow works to progress have not only been due to concerns
raised by stakeholders but significantly because of increases in construction
costs and the requirement for the Council to achieve best value.  
• Council Procurement and Financial Regulations are intended to ensure best
practices are followed and assist officers to operate within delegated authority.
The temporary cabins were procured by issuing an Architect Instruction to the
Contractor for the purchase from a single supplier. The Architect Instruction
was issued in accordance with a direction received from the Senior Project
Page 32

Page 33

Appendix 4
Moray Council
Internal Audit Section 
5
Manager (Early Learning & Childcare). It is appreciated the programmed
timescale requirements for progressing this scheme; however, an advance
payment of £117,430 was made for these temporary cabins without the prior
approval of the Chief Financial Officer. The temporary cabins are currently
stored at the haulage company’s premises and at the time of the audit, have
incurred additional storage costs of approximately £6,000. A decision should
be undertaken as a matter of urgency regarding the future use of these
temporary cabins.   
• As detailed previously, the Education, Children's and Leisure Services
Committee on 14 December 2022 agreed for the Depute Chief Executive
(Education, Communities & Organisational Development) to investigate other
options in providing temporary accommodation. At the time of this audit the
intention was noted to purchase outdoor units (yurts) to be located at the
Aberlour Primary School grounds as temporary accommodation to deliver the
early years learning and childcare service for both nurseries during the period
required for refurbishing the premises. As construction and material costs have
increased over recent years, Property Services have requested an updated
contract price from the Contractor to complete the works. A review should then
be undertaken to ensure the adequacy of the current budget. 
Page 33

Page 34

Appendix 4
Moray Council
Internal Audit Section 
6
2. Introduction 
This audit has been undertaken from a request received from the Depute Chief
Executive (Education, Communities & Organisational Development) after concerns
were raised by elected members regarding the management of the contract for the
refurbishment of Aberlour early years learning and childcare premises.    
The refurbishment of Aberlour early years learning and childcare premises is part of a
larger contract awarded in 2018 to expand the early years learning and childcare
service. The Senior Responsible Officer for the contract is the Head of Education, but
with the refurbishment scheme being operationally managed by the Senior Projects
Officer and currently by the Early Years’ Service Manager in consultation with Property
Services. Progress was regularly reviewed by the Early Years Learning Expansion
Programme Board and later by the Transforming Education Project Board, with
additional reporting to the Transform Learning Board. In Aberlour, the early years and
childcare service is delivered by private and council nurseries; both operate from the
same premises. The contract required the consideration of options in providing
temporary accommodation to allow both nurseries to maintain service delivery during
the refurbishment of the premises. 
3. Audit Scope 
The scope of the audit was to undertake a review of the Aberlour Early Years Learning
and Childcare Scheme regarding the reporting arrangements and compliance with
Financial Regulations, Procurement Guidelines and the Conditions of the Contract.
However, it was noted that the actual works for the refurbishment of the premises have
not yet started. 
4. Summary Assessment 
The Internal Audit Section will provide Management with an opinion on the internal
control environment based on four categories of classification:   
Assurance Level System and Testing Conclusion 
Full  The controls tested are being consistently applied
Page 34

Page 35

Appendix 4
Moray Council
Internal Audit Section 
7
Substantial There is evidence that the level of non-compliance with
some of the controls may put some of the system
objectives at risk.
Limited The level of non-compliance puts the system objectives
at risk.
None Significant non-compliance with basic controls leaves the
system open to error or abuse. 
Our assessment in terms of the design of, and the compliance with the system of
internal controls for Aberlour Early Years and Childcare Scheme as limited by the
scope of audit is set out below: 
System Assessment Testing Assessment
Substantial Limited 
5. Findings 
The main issues raised for management consideration are:
5.01 This audit review was requested by the Depute Chief Executive
(Education, Communities & Organisational Development) after concerns
were raised by elected members regarding the operational management
for the refurbishment of the Aberlour early years learning childcare
premises. Last year the Education, Children’s and Leisure Services
Committee of the 26th of January 2022 requested Internal Audit to report
on concerns regarding the financial management in the expansion of the
Early Years Learning and Childcare Service. Both audit reviews have
resulted in findings and recommendations.
It is considered that the implementation to manage the expansion of the
early years learning and childcare service was appropriately staffed by
qualified officers. In addition, an Early Years Learning and Childcare
Expansion Programme Board (Programme Board) included senior
officers from across the Council was formed at the start of the expansion
programme to support and provide an overview of both capital and
revenue expenditure. The Council has a Project Management
Governance Policy to aid officers in project management governance
arrangements. The Project Management Governance Policy was agreed
Page 35

Page 36

Appendix 4
Moray Council
Internal Audit Section 
8
at Policy & Resources Committee on 7 June 2016, with additional project
management assurances concerning governance and leadership noted
at the Corporate Committee on 30 August 2022. It is appreciated that as
detailed within report to the Corporate Committee, the Policy “still largely
reflect sound project management governance and remain fit for
purpose”.  It was also noted the Policy is based on the Prince2 Project
management methodology, aligned with the Scottish Government
Construction Procurement Manual and the Office of Government
Commerce (OGC) Gateway framework. However, a review of the Policy
noted that minor updates are required regarding reference to previous
post titles, financial regulations and the Audit and Performance
Committee.  
5.02 The refurbishment of Aberlour early years learning childcare premises
was initially intended to be undertaken in August 2020. The contract
detailed a requirement for a “major refurbishment” of the premises.
However, due to the pandemic the refurbishment was delayed for a year
with the intention for the works to be started by the end of 2021. In order
to allow works to progress, the premises had to be vacated and the
delivery of the early years learning and childcare service provided within
alternative accommodation. In March 2021, Property Services in
accordance with an instruction received from the Senior Project Manager
(Early Learning & Childcare) issued an Architect Instruction for the design,
manufacture and delivery of temporary cabins. The audit noted
discussions by the Programme Board regarding this course of action. In
addition this was also reported to the Education, Communities and
Organisational Development Committee on 11 August 2021, which
included the proposed location of a cabin at Speyside High School and
another at Aberlour Primary School. 
The Architect Instruction issued to the Contractor detailed the requirement
to purchase two temporary cabins from a named supplier at the cost of
£234, 860. The procurement of the temporary cabins by the Contractor
from a single supplier was due to programmed timescale requirements
and budgetary needs to complete the works per Scottish Government
deadlines. 
The urgency of timescales is appreciated; however, it is unclear why
consideration was not given for the purchase of the temporary cabins
directly by the Council. Compliance with Council Financial Regulations
Page 36

Page 37

Appendix 4
Moray Council
Internal Audit Section 
9
and Procurement Guidelines not only ensures officers operate within their
delegated authority but also that best practices are followed in the
purchasing of goods, services or works. If a single supplier was the
preferred option due to required timescales, this could have been
undertaken with the approval of the Chief Financial Officer. 
5.03 The procurement of temporary cabins was undertaken by the issue of an
Architect Instruction to the Contractor on 31 March 2021. However, it was
found that discussions held by the Programme Board in May 2021
detailed concerns raised by the Head teacher of Speyside High School
and an Elected Member regarding the proposed placement of a temporary
cabin at the High School. The audit noted that site visits had been made
to the High School by officers of the Programme Board to discuss these
concerns with the Head teacher.
An indicative start date for the refurbishment works was detailed as
November 2021. However, it is understood this did not proceed due to
budgetary pressures, increases in the costs for the refurbishment works
and the concerns raised regarding the intended placement of the
temporary cabin. The Programme Board noted this requirement to delay
the start date and the need for further investigation during the third quarter
of 2021. The audit has experienced difficulties in sometimes evidencing
an audit trail that clearly documents progress. This may be due to the
exceptional circumstances surrounding the pandemic and that officers
have moved to other posts or are no longer employed by the Council. It
was noted that in March and April 2022, further discussions were held that
included a report to the Programme Board where a revised plan was
discussed for the placement of one temporary cabin at the Primary School
and an outdoor facility near the park in Aberlour with the intention of both
nurseries returning to existing premises after the refurbishment works. It
was also noted that in May 2022 discussions were held by the Asset
Management Working Group, regarding a need to increase the capital
budget and the revised option for placement of one temporary cabin at
the Primary School and an outdoor facility near the park in Aberlour.
These revised proposals were then reported to the Education, Children's
and Leisure Services Committee on 24 August 2022. A report to the
Education, Children's and Leisure Services Committee on 2 November
Page 37

Page 38

Appendix 4
Moray Council
Internal Audit Section 
10 
2022 regarding these revised proposals noted concerns raised by elected
members. A further report to the Education, Children's and Leisure
Services Committee on 14 December 2022 agreed for the Depute Chief
Executive (Education, Communities & Organisational Development) to
investigate other options in providing temporary accommodation to allow
the refurbishment works to be completed. It is understood at the time of
this audit, the purchase of outdoor units (yurts) for placement within the
Aberlour Primary School grounds is the preferred option for temporary
accommodation.
The complexity of this Scheme is appreciated, especially due to the
requirement for providing temporary accommodation to allow the
refurbishment works to be completed. The audit noted that consultation
had been undertaken with officers and parents concerning the needs of
the Scheme. In addition, construction cost increases and the Council's
requirement to achieve best value have also impacted the decision
making process. However, temporary accommodation options were
progressed incurring significant costs that were later deemed unsuitable.
In addition, concerns were also raised by affected stakeholders.
Consideration should be given to any improvements that may be required
in the current arrangements for consultation and communication with
stakeholders for future projects.
5.04 Further to a directive from the Senior Project Manager, an Architect
Instruction was issued to the Contractor for purchasing two temporary
cabins at £234,860, it was noted that £117,430 was paid in advance to
the supplier for the design, manufacture and delivery. In addition, another
Architect Instruction was also issued in December 2021 for the purchase
of replacement doors to meet Scottish Building Regulations at the cost of
approximately £14,000.  This has also incurred additional costs of
approximately £2000 to the Council for storing and delivering these doors
to the Building Services Depot at Keith. Currently, the temporary cabins
are stored with a haulage company that has incurred at the time of this
audit a cost of approximately £6000. This review has already raised
concerns regarding the procurement arrangements for purchasing the
temporary cabins; however Financial Regulations detail the requirement
for advance payments to be authorised by the Chief Financial Officer. No
Page 38

Page 39

Appendix 4
Moray Council
Internal Audit Section 
11 
evidence could be found that the Chief Financial Officer had been
consulted to authorise the advance payment for the purchase of the
temporary cabins. A decision is also required as a matter of urgency
regarding the future intention of the temporary cabins stored with a
haulage company. 
5.05 As the works for refurbishing the Aberlour early years learning and
childcare premises have yet to start, undertaking a full contract audit has
not been possible to ensure compliance with the Conditions of Contract.
It is acknowledged that officers dealing with Scheme within Property
Services have retired or are no longer employed by the Council. The
assistance provided by the Principal Quantity Surveyor in the completion
of this review is much appreciated. However, during the audit, supporting
contract documentation requested could not be found or possibly needed
to be completed. Moving forward, it would be beneficial if the
refurbishment of the Aberlour early years learning and childcare premises
contract is reviewed to ensure documents are easily retrievable that will
evidence compliance with the Conditions of Contract and Council Policies
and Regulations. 
5.06 At the time of the audit, the current expenditure for this Scheme amounted
to approximately £340,000. The Moray Council Committee on 29 June
2022 agreed on a budget of £900, 000 to complete the works. As detailed
within this report, it has now been decided to investigate the purchasing
of outdoor units (yurts) to be located at the Aberlour Primary School
grounds as temporary accommodation for the nurseries during the period
for the refurbishment of the premises. As construction and material costs
have increased over recent years, an updated contract price should be
obtained from the Contractor for the completion of the works. Thereafter,
the adequacy of the current budget should be reviewed.     
Page 39

Page 40

Appendix 4
Moray Council
Internal Audit Section 
12 
6. Recommendations 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Key Control:  Effective management controls operate to ensure the delivery for the refurbishment Aberlour Early Learning and Childcare
Premises in accordance with Council Regulations and Conditions of Contract 
5.01  Consideration should be
given to updating job titles and
other points of reference
recorded within the Project
Management Governance
Policy. 
Low  Yes 
Council
programme
governance was
reviewed by
cmt/smt in 2022
with a number of
actions identified
and reported to
committee in Aug
22. Further review
is not currently
merited given short
passage of time
and that council
arrangements 
Depute Chief
Executive
(Education,
Communities
&
Organisational
Development) 
30/09/2023
Page 40

Page 41

Appendix 4
Moray Council
Internal Audit Section 
13 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
reflect recognised
standards.
However, the
Policy will be
updated to reflect
current Council
post titles/
regulations/ comm. 
Project
Management
training has
already been
delivered to
cmt/smt and is
available for other
officers via OD. 
Project checklist
has also been
established to
support project
management
Page 41

Page 42

Appendix 4
Moray Council
Internal Audit Section 
14 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
5.02  All officers responsible for
purchasing goods, services or
works should be reminded of
the Council’s Financial
Regulations and Procurement
Guidelines.    
High  Yes Annual
reminders will
be given to
officers re
Financial Regs
and where this
has not
happened,
training will be
undertaken
Head of
Housing &
Property/
Head of
Education
(Chief
Education
Officer)
30/06/2023
5.03 Consideration should be
given to any improvements
that may be required in the
current arrangements for
consultation and
communication with
Medium  Yes Improvement is
to assure
arrangements
as each project
develops.  To
support this,
the project
checklist
contains 
Depute Chief
Executive
(Education,
Communities
&
Organisational
Development) 
Implemented-
Checklist is
already in place 
Ongoing action is
as projects reach
key stages
Page 42

Page 43

Appendix 4
Moray Council
Internal Audit Section 
15 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
stakeholders for future
projects.
specific points
on planning
communication
and
engagement
and roll out is
being
supported by
the PM
Network
Page 43

Page 44

Appendix 4
Moray Council
Internal Audit Section 
16 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
5.04 All officers involved in
procuring goods, services and
works should be reminded
that in accordance with
Financial Regulations,
advance payments must be
authorised by the Chief
Financial Officer. 
As a matter of urgency, a
decision is required regarding
the future intention of the
temporary cabins stored with
the haulage company.
Consideration should be
given for the temporary cabins
High 
High
Yes 
Yes 
This should be
written into
documentation
for key projects
where
processes
aligned to
Financial Regs
are clear from
offset 
Use of
temporary units
are being
considered as
a wider
discussion and
should be
included at
Head of
Housing &
Property/
Head of
Education
(Chief
Education
Officer) 
30/06/2023 
30/06/2023 
Page 44

Page 45

Appendix 4
Moray Council
Internal Audit Section 
17 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
to be used by another
establishment or be sold.   
DCEs
recommendati
on in Learning
Estate portfolio.
Temporary
units will be
sold if no use
identified. 
5.05 The refurbishment contract
for the Aberlour early years
learning and childcare
premises should be reviewed
to ensure documents are
easily retrievable to evidence
compliance with the
Conditions of Contract and
Medium Yes Further to
recruitment to
vacant posts
the service now
has adequate
capacity to
resource
ongoing
projects to
Head of
Housing &
Property  
30/06/2023
Page 45

Page 46

Appendix 4
Moray Council
Internal Audit Section 
18 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Council Policies and
Regulations. 
requisite
standards and
immediate
reconciliation of
existing
documentation
will be
undertaken.
5.06 The contractor should be
contacted for an updated cost
estimate for the completion of
the works and if required the
budget should be reviewed
and updated.
Medium  Yes The process is
for a tender
from the
contractor to be
assessed by
the QS. No
tender was
received by the
deadline date
and this has
been reported
Head of
Housing &
Property 
30/06/2023
Page 46

Page 47

Appendix 4
Moray Council
Internal Audit Section 
19 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
through the
normal
governance
process and
other
procurement
approaches to
achieve best
value are being
put to the client.
.
Page 47

Page 48

Page 48

Page 49

REPORT TO:  AUDIT AND SCRUTINY COMMITTEE ON 10 MAY 2023
SUBJECT:       INTERNAL AUDIT SECTION UPDATE REPORT
BY:                    AUDIT AND RISK MANAGER 
1. REASON FOR REPORT 
1.1 The report provides Committee with an update on the work of the Internal
Audit Section. 
1.2 This report is submitted to Committee in terms of Section III I (2) and (7) of the
Council’s Scheme of Administration relating to consideration of reports from the
council’s Internal Auditor and monitoring delivery of the audit service carried out
by Internal Audit. 
2. RECOMMENDATION 
2.1 Committee is asked to consider the contents of this report, seek
clarification on any points noted and otherwise note the report. 
3. BACKGROUND 
3.1  Public Sector Internal Audit Standards requires the Audit and Risk Manager to
prepare and present reports to committee on internal audit’s activity,
performance relative to its Audit Plan, and any other relevant matters. 
3.2  This report provides an update on audit activity and projects progressed since
the last meeting.   
4. UPDATE OF PROGRESS AGAINST THE AUDIT PLAN 
National Fraud Initiative 2022 – Council Tax Single Person Discount
4.1 The National Fraud Initiative (NFI) is a data matching project conducted by the
Cabinet Office on behalf of Audit Scotland. Public bodies, including Local
Authorities are mandatory participants in this process. A matching exercise was
undertaken between information provided by the Taxation Service of
householders claiming council tax single person discount and the electoral
register, where there is more than one person in the household aged 18 or over
at the property. The report provided by the NFI detailed 3129 matches.
Item 6.
Page 49

Page 50

4.2 While this volume of matches is significant, previous exercises have shown that
the incidence of fraud is not. Accordingly, a proportionate approach has been
taken to testing, which involved a high level ‘scanning’ of all matched data and
more in-depth testing of a sample of matches: the following points were noted: 
• Majority of the matches related to timing issues where changes of
circumstances have occurred but are not reflected within the information
provided to the NFI.
• However, testing found a need to cancel single person discounts for 13
households from the information provided in the NFI match. Most of these
matches are related to changes in circumstances during the current year.
An investigation is currently being undertaken by the Service in seeking a
more automated approach to completing annual reviews of eligibility of
claimants to council tax single person discount. 
Follow Up Reviews
4.3 Internal Audit reports are regularly presented to elected members detailing not
only findings but also the responses by management to the recommendations
with agreed dates of implementation. Internal Audit will also undertake follow up
reviews to evidence the effective implementation of these recommendations.
Please see detailed the following completed follow up reviews: 
Health & Social Care Moray - Self-Directed Support (SDS)
4.4 This audit reviewed the arrangements for monitoring service users who receive
an SDS direct payment to purchase their own support. The audit involved the
random selection of a sample of care packages and a check made to ensure
compliance with operating procedures, expenditure incurred by the service user
is in accordance with the agreed budget/ support plans and surplus funds are
recovered from service users where appropriate. It was noted that a total of 150
adult service users receive an SDS direct payment to purchase their own
support at a cost of approximately £3 million annually. The Follow Up Report to
review the implementation of the agreed recommendations is given in Appendix
1. Unfortunately, it was found that the majority of the recommendations had not
been implemented. The Service detailed particular issues regarding staff
shortages and revised dates of implementation have been agreed. 
Health & Social Care Moray - Client Monies
4.5 This audit concerned a review of the processes undertaken by the Community
Care Finance Team in how they administer the corporate bank account. It
involved selecting a sample of individuals, and a check made on how the Health
and Social Care Officer appointed as the named "Corporate Appointee"
manages and supports the individuals to access their funds appropriately. The
Adults with Incapacity (Scotland) Act 2000 enables a Health and Social Care
Officer to be appointed by the DWP to have "Corporate Appointeeship"
responsibility for managing the benefits received by an individual. At the time of
the audit, it was found that 59 individuals are being managed within the
"Corporate Apppointeeship" Scheme with a combined value of £483,000 held
within the Council's corporate bank account. The Follow Up Report to review the
implementation of the agreed recommendations is given in Appendix 2. The
Service detailed that it has not been possible to implement a number of the
recommendations within the previously agreed timescales. There will therefore
Page 50

Page 51

be a need to undertake a further follow up review of this audit and thereafter
report progress to a future Audit and Scrutiny Committee. 
Procurement and Creditor Payments
4.6 An audit was undertaken to review payments made by the Authority to suppliers
of goods and services. The purpose of the audit was to confirm that effective
controls are operating to ensure all payments are appropriately authorised,
accurate and paid in accordance with financial regulations and agreed terms and
conditions. This audit review related to testing a sample of transactions
generated under the direction of the Moray Integration Joint Board. Through the
use of computer audit software, a sample of payments was randomly selected
from this period with a value of £1.05 million. The testing undertaken was
developed from the Chartered Institute of Public Finance and Accountancy’s
Audit Programme. The Follow Up Report to review the implementation of the
agreed recommendations is given in Appendix 3. It is pleasing to report that all
recommendations have now been implemented. 
Social Media Accounts
4.7 A follow up review was undertaken of the audit undertaken regarding the
Council’s use of Social Media. Social media refers to websites and applications,
e.g., Facebook and Twitter that are designed to allow people to share content
quickly, efficiently, and in real time. Officers use social media as a form of
communication across various services. It was found that the Corporate
Communications Team is primarily responsible for posting Council information.
However, individual services such as Health and Social Care, Schools, Sports
and Community Centres, fostering and kinship manage their own social media
accounts. The Follow Up Report confirming the implementation of the agreed
recommendations is given in Appendix 4. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Internal audit work supports good governance and the delivery of
efficient services. 
(b) Policy and Legal
No implications directly arising from this report. 
(c) Financial Implications
No implications directly arising from this report. 
(d) Risk Implications
The independent review of selected systems and procedures mitigates
the risk associated with inadequate or ineffective control procedures. 
(e) Staffing Implications
No implications directly arising from this report. 
Page 51

Page 52

(f) Property
No implications directly arising from this report. 
(g) Equalities/Socio Economic Impact
No implications directly arising from this report 
(h) Climate Change and Biodiversity Impacts 
No implications. 
(i) Consultations
There have been no direct consultations during the preparation of this
report. 
6. CONCLUSION 
6.1 This report provides committee with an update on internal audit work
progressed in the latest review period. 
Author of Report:
Background Papers:
Dafydd Lewis 
Internal Audit files
Audit and Risk Manager
Ref: SPMAN-1042990102-
149   
Page 52

Page 53

Appendix 1
Moray Council
Internal Audit Section 
1
DEPARTMENT: Health and Social Care Moray
SUBJECT:  Self-Directed Support 
REPORT REF: 22'013
Follow Up Audit Review 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
Key Control: Clear and current policy documents and operational guidelines have been developed for the financial administration of SDS
packages.
5.01 The SDS Direct Payment
guidance and financial monitoring
procedures should be reviewed
and updated on a regular basis.   
Low Yes 30/04/2022 Implemented. Financial Monitoring
Procedures were updated in October 2021 and
SDS Direct Payments Guidance was revised
in April 2022. 
Item 6.
Page 53

Page 54

Appendix 1
Moray Council
Internal Audit Section 
2
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
Key Control: Financial reviews are being carried out to monitor the usage of SDS funding in accordance with operational guidelines.
5.02 Annual financial reviews should
be undertaken in line with the
direct payment financial
monitoring procedures. 
High Yes 31/01/2022 Not implemented. The review found a backlog
in the Service undertaking annual financial
reviews.  Discussions with the Service noted
there had been multiple staffing changes and
vacancies for a prolonged period. It is hoped
that with a stable staffing position, the
resources are now available for implementing
this recommendation by 31/08/2023.   
5.03 Consideration should be given to
the routine production of reports
from the Care First System which
can be used to detail financial
reviews falling due and allow
management to prioritise
workloads accordingly. The
Medium Yes 31/12/2021 Implemented. Reports are being produced by
the CareFirst system to detail financial reviews
due and their priority. The reports have also
indicated a data cleansing need within
CareFirst which is being undertaken to ensure
data remains accurate.   
Page 54

Page 55

Appendix 1
Moray Council
Internal Audit Section 
3
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
requirement of manual
spreadsheets should be
minimised wherever possible to
ensure information reference
points come direct from the Care
First system. 
5.04 A risk based approach should be
initiated by management to
prioritise outstanding financial
reviews and work through the
backlog in an order which makes
best use of limited resources. 
High Yes 31/12/2021 Not implemented. The review noted a backlog
remains in the Service undertaking financial
reviews. It was found the service had
developed a prioritisation plan, but due to
resourcing issues, it has not been possible to
implement this recommendation. A revised
implementation date of 31/08/2023 has been
agreed. 
Page 55

Page 56

Appendix 1
Moray Council
Internal Audit Section 
4
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
5.05 A reminder should be issued to
service users, and approved
payroll providers where
applicable, to inform the Authority
when funds in excess of the
contingency amount are held. This
may assist in the prioritisation of
early financial reviews and
highlight issues for further
investigation. 
High Yes 30/04/2022 Implemented. Assurance has been obtained
from the Service that this has been
undertaken. Further reminders are to be
issued in January 2023 and will be scheduled
annually each January going forward,
incorporated into an annual data check. 
5.06 A review should be undertaken of
all Service Users in regard to the
current balances held within their
SDS bank account. Action should
then be taken to recover excess
funds. 
High Yes 30/04/2022 Not implemented. Significant surpluses were
reclaimed on managed accounts as a result of
obtaining details of all bank balances following
the audit undertaken. The Service commenced
work on a review of unmanaged accounts, but
this has not been completed due to staffing
issues. A revised implementation date of
Page 56

Page 57

Appendix 1
Moray Council
Internal Audit Section 
5
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation 
31/08/2023 has been agreed.   
5.07 In compliance with established
procedures, one-off direct
payments should be subject to a
financial monitoring review 3
months (or in limited
circumstances at another interval)
after the funding has been
distributed to confirm its
appropriate usage. 
Medium Yes 30/04/2022 Not implemented. The Service has detailed
staffing issues as the reason for not
implementing this recommendation. A revised
implementation date of 31/08/2023 has been
agreed. 
5.08 The Service should comply with
the monitoring requirements
detailed within an agreement
between the Council and Service
User for the purchase and
Medium Yes 31/12/2021 Not implemented. The Service has detailed
staffing issues within the SDS Team and
Social Work as the reason for not
implementing this recommendation. While
some details of the purchase have been
obtained, many other conditions in the legal
Page 57

Page 58

Appendix 1
Moray Council
Internal Audit Section 
6
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
adaptation of a mini van.  agreement between the Council and the
Service User have not been evidenced. SDS
Team to liaise with Social Work, and a revised
implementation date of 31/03/2023 has been
agreed. 
5.09 Closing financial reviews of SDS
care packages should be
undertaken in accordance with
agreed procedures. Evidence
should be retained of any
expenditure outwith the agreed
support plan and of the full
discussions held and decisions
made by Social Workers
regarding retrospective
authorisation. 
Medium Yes 31/12/2021 Not implemented. At the end of a direct
payment package monies are returned, but
closing reviews have not been carried out to
confirm monies have been applied
appropriately. The Service has detailed
staffing issues as the reason for not
implementing this recommendation. A revised
implementation date of 31/08/2023 has been
agreed. 
Page 58

Page 59

Appendix 1
Moray Council
Internal Audit Section 
7
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
Key Control: SDS Funding is only used to support the service user's support plan outcomes and compliance is monitored to ensure public funds
are spend appropriately. 
5.10 Care and Support Plans should be
reviewed annually to ensure the
agreed care is being provided and
continues to meet the service
user's needs. 
High Yes 01/05/2022 Not implemented. The follow-up audit exercise
noted that since the pandemic annual support
plan reviews have not recommenced across all
parts of the Service. Limitations were stated in
resources with staffing vacancies and
workload pressures due to an increased
demand for care, including the requirement to
deal with particularly complex cases and
increasing difficulties in sourcing care. Priority
has been given to support plans for new and
changing care arrangements rather than
routine annual reviews. The newly appointed
Head of Service will review current
procedures. The current status of this
recommendation will be reviewed in the follow-
up audit after 31/08/2023. 
Page 59

Page 60

Appendix 1
Moray Council
Internal Audit Section 
8
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
5.11 All Social Workers should be
reminded of the requirement to
inform the SDS Team of any
amendment to a Support Plan that
will have a financial change to a
service user's care package.   
High Yes 01/12/2022 Implemented. The SDS Team sends
reminders to Social Work regarding the
requirement to refer support package changes
where there is a financial implication. A recent
reminder to officers was noted on 01/12/2022. 
Key Control: SDS service has effective arrangements in place to monitor support packages and report on performance.
5.12 Consideration should be given to
the development of appropriate
performance monitoring
measures to be reported to
service management on a regular
basis. Given the current backlog of
reviews and consequences of
direct payment accounts not being
Low Yes 30/09/2022 Not implemented. Performance measures for
Health & Social Care as a whole are being
developed using Pentana. Initial work on
developing these measures is being led by the
Performance Team and started in July 2022. A
delay has been experienced due to workload
pressures and the 30/09/2022 target has not
been met. The Performance Team is to
commence engagement with the SDS Team
Page 60

Page 61

Appendix 1
Moray Council
Internal Audit Section 
9
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
scrutinised on a timely schedule, it
may be beneficial for performance
information to be made available
for management to identify any
resourcing issues arising and
assess risks involved. 
on their specific performance measures in
November 2022. The Commissioning
Manager has agreed to a revised
implementation date of 31/03/2023. 
Page 61

Page 62

Page 62

Page 63

Appendix 2
Moray Council
Internal Audit Section 
1
DEPARTMENT: Health & Social Care Moray 
SUBJECT:  Client Monies 
REPORT REF: 22'011
Follow Up Audit Review 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
Key Control: Clear and current policy documents and operational guidelines have been developed for the financial management of client monies.
5.01 The Procedures for Managing
Service User's Money and
Corporate Appointeeship should
be reviewed and updated and a
subsequent regular cycle of
review maintained. 
Medium Yes 31/10/2022 Not implemented. Procedures have not been
reviewed and updated as intended due to
staffing absence. This will now be prioritised
and a revised implementation date of
30/06/2023 has been agreed. 
Item 6.
Page 63

Page 64

Appendix 2
Moray Council
Internal Audit Section 
2
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
5.02 Procedures for the management
of client monies should be
promoted to ensure there is an
awareness of their requirements
by all officers involved in client
finance administration. 
Medium Yes 31/10/2022 Not implemented. As procedures have not
been reviewed per 5.01, the intended
promotion activity after update has not been
undertaken. A revised completion date of
30/06/2023 has been agreed. 
Key Control: Correct formal powers to administer client monies have been obtained. 
5.03 Clarification should be obtained
from Legal Services regarding the
length of time funds must be
retained on behalf of deceased
clients and potential action which
can be taken should the funds not
be claimed within the timeframe. 
Medium Yes 31/10/2022 Implemented. A process is now in place for
active pursual of estate settlement and referral
to National Ultimus Haeres Unit to aid fund
dispersement where applicable.  The balance
held in relation to these funds has significantly
decreased since the audit was undertaken. 
Page 64

Page 65

Appendix 2
Moray Council
Internal Audit Section 
3
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
Consideration should also be
given to holding these funds
separate to the corporate bank
account for increased visibility.   
A separate balance record is being maintained
for increased visibility of deceased client funds
and to record actions taken. 
Key Control: All transactions should be for benefit of the client with justifiable supplier selection, verified to source documentation and in line with
the client's Financial Management Plan. Any cash held is done so securely and with full accounting arrangements. 
5.04 Due to changes in operating
practices a full review of current
cash handling procedures should
be undertaken. The review should
include a risk assessment to
ensure best practices are followed
regarding the safety and security
of both officers and client funds.
Documented procedures should
thereafter be updated to reflect
High Yes 31/07/2022 Not implemented. The topic was initially
referred to Practice Governance Group,
however, the service has decided a full review
of the corporate account is required and a
meeting has been instigated with all relevant
staff. As this will take time and resources to
complete a revised implementation date of
31/07/2023 has been agreed. 
Page 65

Page 66

Appendix 2
Moray Council
Internal Audit Section 
4
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
any agreed changes. 
Key Control: Robust records of fund administration per client are maintained.
5.05 Confirmation of the monthly
reconciliation of the Corporate
bank account to manual records
should be undertaken by
Community Care Finance
management. This should also
include the verification of a 
sample of transactions to source
cumentation. 
High Yes 31/05/2022 Implemented. There is now a monthly
management check of the corporate bank
account reconciliation and a sample of
transactions are independently checked for
validity. The follow-up exercise has resulted in
further enhancements to the management
check being advised such as types of
transactions for increased focus, which will
increase the strength of the scrutiny process. 
Page 66

Page 67

Appendix 3
Moray Council
Internal Audit Section 
1
DEPARTMENT:   Health & Social Care Moray 
SUBJECT:  Procurement and Creditor Payments 
REPORT REF: 23'008
Follow Up Audit Review
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
Key Control: Effective controls in the processing of creditor payments to ensure compliance with Financial Regulations and Procurement
Guidelines   
5.01 A review should be undertaken
across all social care external
providers to ensure that payments
are not made in advance of the
service delivery 
High Yes 15/08/22 Implemented- A review of providers has been
undertaken, and testing noted only one
example where payment had been made
before the service was delivered.  However,
further investigation found that approval had
Item 6.
Page 67

Page 68

Appendix 3
Moray Council
Internal Audit Section 
2
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
been obtained from the Chief Financial Officer
in accordance with Financial Regulations.  
5.02 Monitoring arrangements within
the Community Care Finance
Team should be amended to
include a requirement to record all
invoices processed for payment 
Medium Yes 31/08/22 Implemented - The monitoring database
recording invoices passed for payment has
been amended to include additional
information on when care has been provided
to service users. 
It was also noted that a revised Standard
Operating Procedures (SOP) had been
prepared but has not been finalised.  The SOP
details requirement for recording information
on the monitoring database. 
5.03 The Community Care Finance
Team should check invoices
received from Care Providers to
ensure the care delivered to each
Medium Yes 31/08/22 Implemented – Invoices are matched to
CareFirst to ensure that the care being billed
for agrees to the support package as detailed
Page 68

Page 69

Appendix 3
Moray Council
Internal Audit Section 
3
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
service user corresponds to their
individual authorised support
package detailed within CareFirst 
in the system.  Where discrepancies arise,
confirmation is sought from Social Work. 
5.04 Payments should be made to the
agreed Care Provider and not a
sub contracted company 
High Yes 31/08/22 Implemented. - The follow up review has
confirmed that payments are no longer being
made to a third party but to the Care Provider. 
Page 69

Page 70

Page 70

Page 71

Appendix 4
Moray Council
Internal Audit Section 
1
DEPARTMENT: Chief Executive 
SUBJECT:  Social Media 
REPORT REF: 22'012
Follow Up Audit Review 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
Key Control: The use of social media to facilitate council activities i.e communications, has adequate controls and monitoring 
5.01 A single guidance document should
be developed for officers in the use of
social media accounts. 
Medium Yes 31/04/2022 Implemented. A Social Media Guidance 
Document has been prepared and is currently
going through an employee consultation
process. 
Item 6.
Page 71

Page 72

Appendix 4
Moray Council
Internal Audit Section 
2
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
5.02 The Media and Communications
Section should be informed prior to a
Service setting up a Social Media
Account. 
Medium Yes 31/11/2022 Implemented. Evidence noted of the Media
and Communications Section being informed
of the setting up of new Social Media
Accounts. 
5.03 The Media and Communications
Section should maintain a record of
social media accounts and 
officers authorised to post information
across all Council services.   
Medium Yes 31/11/2022 Implemented. Noted that a record is now
maintained of Council social media accounts
and officers authorised to post information. 
5.04 Consideration should be given that
prior to allowing officers access to a
Council social media account,
training should be undertaken. 
Medium Yes 16/12/2022 Implemented. An E-Learning module is now
available to officers, and in-person sessions
can also be provided when requested. Officers
must complete the E-Learning module before
access is allowed.  
Page 72

Page 73

Appendix 4
Moray Council
Internal Audit Section 
3
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
5.05 Further exploration should be
undertaken to the benefits of
introducing additional security
controls available from social media
website providers. 
Medium Yes Ongoing Implemented. Two step authorisation is
required for all Facebook Council accounts. In
addition, a review of other social media
platforms has been completed with the
intention of also requiring a two step
authorisation procedure before access is
allowed.   
Page 73

Page 74

Page 74

Page 75

REPORT TO: AUDIT AND SCRUTINY COMMITTEE ON 10 MAY 2023 
SUBJECT: ANNUAL AUDIT PLAN FOR THE YEAR ENDING 31 MARCH 2023 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT &
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the Auditor’s Annual Audit Plan for 2022/23. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee consider and note the contents of
the External Auditor’s Annual Plan for 2022/23. 
3. BACKGROUND 
3.1 In September 2022, the Accounts Commission confirmed the appointment of
Grant Thornton as the external auditor for the Council for financial years
2022/23 to 2026/27 inclusive. 
3.2 In delivering the public audit for Moray, Grant Thornton will provide
independent assurance that public money has spent appropriately and
provides value.  Audit work is carried out in accordance with International
Standards on Auditing, the Code of Audit Practice and any other relevant
guidance. 
3.3 The audit includes consideration of Best Value. 
4. ANNUAL AUDIT PLAN 2022/23 
4.1 Grant Thornton’s Annual Audit Plan for 2022/23 is attached as APPENDIX 1
to this report.  The Plan sets out the scope of the audit work and the auditor’s
approach to the audit. The Plan details the initial risks identified by Grant
Thornton and planned work to be undertaken for the audit of the financial
statements for the year ending 2022/23. 
Item 7.
Page 75

Page 76

4.2 The main risks for the Council will be the focus of audit testing and are
outlined on page 11 of the Plan.  In order to assist with the assessment of
risk, an Informing the Audit Risk Assessment was completed by senior
managers and this is attached as APPENDIX 2. 
4.3 Page 6 of the Annual Audit Plan shows the External Audit fee for 2022/23 as
£282,860, which is an increase of 12.5% on the previous year, reflecting
additional requirements placed on auditors which come into effect this year. 
4.4  The annual accounts timetable, including key deadlines are shown on page 7
of the Annual Audit Plan and includes the statutory requirement for the
Council to submit the Unaudited Annual Accounts along with supporting
working papers to Grant Thornton by 30 June 2023, following consideration
by those charged with governance at the meeting of Moray Council on 28
June 2023. The Council will be asked to consider the Annual Audit Report and
approve the Audited Annual Accounts at its meeting on 27 September 2023. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) 
(b) Policy and Legal
The external audit is conducted in terms of statutory powers afforded to
the appointed External Auditor and in accordance with Grant Thornton’s
Code of Practice. 
(c) Financial implications
The annual audit fee for 2022/23 is £282,860. 
(d) Risk Implications
The risks associated with the Audit Plan have been identified and
categorised within the Audit Plan on page 11. 
(e) Staffing Implications
Preparation of the Council’s financial statements will be co-ordinated by
the Chief Financial Officer and will require input from Financial Services
along with other departments across the Council. 
(f) Property
None arising directly from this report. 
(g) Equalities/Socio Economic Impact
None arising directly from this report. 
(h) Climate Change and Biodiversity Impacts
None arising directly from this report.
Page 76

Page 77

(i) Consultations
The content of the Annual Audit Plan has been discussed with CMT, the
Chief Financial Officer and the Audit and Risk Manager prior to
production and their comments have been incorporated where
appropriate. 
6. CONCLUSION 
6.1 The Annual Audit Plan informs the Council, its Committees and officers
of the work to be undertaken by External Audit (Grant Thornton) in the
year ahead. 
Author of Report: Laurie Milne, Senior Accountant
Background Papers: 
Ref: LM/LJC/SPMAN-1293228629-859 
Page 77

Page 78

Page 78

Page 79

Item 7.
Page 79

Page 80

Commercial in confidence
Page 80

Page 81

Commercial in confidence
Page 81

Page 82

Commercial in confidence
•
•
•
•
•
•
•
•
•
Page 82

Page 83

Commercial in confidence
•
•
•
•
•
•
•
•
Page 83

Page 84

Commercial in confidence
•
•
•
•
Page 84

Page 85

Commercial in confidence
Page 85

Page 86

Commercial in confidence
8
•
•
•
•
•
Page 86

Page 87

Commercial in confidence
Page 87

Page 88

Commercial in confidence
•
•
•
•
•
•
Page 88

Page 89

Commercial in confidence
•
•
•
•
•
•
Page 89

Page 90

Commercial in confidence
Page 90

Page 91

Commercial in confidence
Page 91

Page 92

Commercial in confidence
•
•
•
•
•
•
•
•
Page 92

Page 93

Commercial in confidence
•
•
•
•
•
Page 93

Page 94

Commercial in confidence
•
•
•
•
Page 94

Page 95

Commercial in confidence
•
•
•
•
–
–
–
–
–
–
•
•
Page 95

Page 96

Commercial in confidence
•
•
Page 96

Page 97

Commercial in confidence
Page 97

Page 98

Commercial in confidence
Page 98

Page 99

Commercial in confidence
Page 99

Page 100

Commercial in confidence
Page 100

Page 101

Commercial in confidence
Page 101

Page 102

Commercial in confidence
Page 102

Page 103

Commercial in confidence
•
•
•
•
Page 103

Page 104

Commercial in confidence
•
•
•
Page 104

Page 105

Commercial in confidence
Page 105

Page 106

Commercial in confidence
•
•
Page 106

Page 107

Commercial in confidence
•
•
•
Page 107

Page 108

Commercial in confidence
•
•
•
•
•
•
•
•
•
•
Page 108

Page 109

Commercial in confidence
•
•
•
•
•
•
•
•
Page 109

Page 110

Commercial in confidence
•
•
•
•
•
•
Page 110

Page 111

Commercial in confidence
Page 111

Page 112

Commercial in confidence
Service Fees £
Service Fees £
•
•
•
•
Page 112

Page 113

Commercial in confidence
35
Adding value through the audit
•
•
•
Inflo
•
•
•
•
•
•Page 113

Page 114

Page 114

Page 115

Commercial in confidence
Page 115

Page 116

Commercial in confidence
Page 116

Page 117

Commercial in confidence


 
 
 
 










Page 117

Page 118

Commercial in confidence
40
•
•
•
•
•
Page 118

Page 119

Commercial in confidence
41
•
•
•
•
•
•
Page 119

Page 120

Commercial in confidence
•
•
•
•
•
•
Page 120

Page 121

Commercial in confidence
Page 121

Page 122

Commercial in confidence
44
•
•
•
•
•
•
•
•
•
•
Page 122

Page 123

Commercial in confidence
•
•
•
•
•
•
•
•
Page 123

Page 124

Page 124

Page 125

Informing the audit risk assessment
for Moray Council
2022/23
Angela Pieri
Director
T 0161 214 6337
E Angela.L.Pieri@uk.gt.com
Rebecca Lister
Senior Manager
T 020 7728 2529
E Rebecca.Lister@uk.gt.com
Hannah McKellar
Manager
T 0131 659 8569
E Hannah.L.McKellar@uk.gt.com
Item 7.
Page 125

Page 126

© 2023 Grant Thornton UK LLP | Moray Council 2022/23
Commercial in confidence
The contents of this report relate only to the matters which have come to our attention, which
we believe need to be reported to you as part of our audit process.  It is not a comprehensive
record of all the relevant matters, which may be subject to change, and in particular we cannot
be held responsible to you for reporting all of the risks which may affect your business or any
weaknesses in your internal controls.  This report has been prepared solely for your benefit and
should not be quoted in whole or in part without our prior written consent. We do not accept any
responsibility for any loss occasioned to any third party acting, or refraining from acting on the
basis of the content of this report, as this report was not prepared for, nor intended for, any
other purpose.
2
Page 126

Page 127

© 2023 Grant Thornton UK LLP | Moray Council 2022/23
Commercial in confidence
Table of Contents
Section Page
Purpose 4
General Enquiries of Management 6
Fraud 9
Fraud Risk Assessment 10
Laws and Regulations 15
Impact of Laws and Regulations 16
Related Parties 18
Going Concern 20
Accounting Estimates                                                                                            22
Accounting Estimates - General Enquiries of Management 23
Appendix A – Accounting Estimates 26
3
Page 127

Page 128

© 2023 Grant Thornton UK LLP | Moray Council 2022/23
Commercial in confidence
Purpose
The purpose of this report is to contribute towards the effective two-way communication between Moray Council’s external auditors and Moray
Council’s Audit and Scrutiny Committee, as 'those charged with governance'. The report covers some important areas of the auditor risk assessment
where we are required to make inquiries of the Audit and Scrutiny Committee under auditing standards.  
Background
Under International Standards on Auditing (UK), (ISA(UK)) auditors have specific responsibilities to communicate with the Audit, Risk and Assurance
Committee. ISA(UK) emphasise the importance of two-way communication between the auditor and the Audit and Scrutiny Committee and also
specify matters that should be communicated.
This two-way communication assists both the auditor and the Audit and Scrutiny Committee in understanding matters relating to the audit and
developing a constructive working relationship. It also enables the auditor to obtain information relevant to the audit from the Audit and Scrutiny
Committee and supports Audit and Scrutiny Committee in fulfilling its responsibilities in relation to the financial reporting process.
Communication
As part of our risk assessment procedures we are required to obtain an understanding of management processes and the Authority’s oversight of the
following areas:
• General Enquiries of Management
• Fraud,
• Laws and Regulations,
• Related Parties,
• Going Concern, and
• Accounting Estimates.
4
Page 128

Page 129

© 2023 Grant Thornton UK LLP | Moray Council 2022/23
Commercial in confidence
Purpose
This report includes a series of questions on each of these areas and the response we have received from Moray Council’s management. The Audit
and Scrutiny Committee should consider whether these responses are consistent with its understanding and whether there are any further
comments it wishes to make.
5
Page 129

Page 130

© 2023 Grant Thornton UK LLP | Moray Council 2022/23
Commercial in confidence
General Enquiries of Management
Question Management response
1. What do you regard as the key events or issues that
will have a significant impact on the financial statements
for 2022/23? 
Impact of inflation on construction costs and by extension on DRC valuations.
2. Have you considered the appropriateness of the
accounting policies adopted by Moray Council?
Have there been any events or transactions that may
cause you to change or adopt new accounting policies?
If so, what are they?
Accounting Policies are reviewed each year as the Accounts are prepared and changes incorporated where
deemed necessary.
No changes to Accounting Policies are anticipated for the 2022/23 Accounts.
3. Is there any use of financial instruments, including
derivatives? If so, please explain No derivatives.
Financial Liabilities – measured at amortised cost and include: Long Term Loans from PWLB and
commercial lenders, Short Term Loans from other Local Authorities, Lease Payables, PPP Contracts, Trade
Payables.
Financial Assets – measured at amortised cost and include: Cash in Hand, Bank Current and Deposit
Accounts, Trade Receivables for Goods and Services Provided.
4. Are you aware of any significant transactions outside
the normal course of business? If so, what are they? Not aware of any significant transactions.
6
Page 130

Page 131

© 2023 Grant Thornton UK LLP | Moray Council 2022/23
Commercial in confidence
General Enquiries of Management
Question Management response
5. Are you aware of any changes in circumstances that
would lead to impairment of non-current assets? If so,
what are they?
Not aware of any specific circumstances.
6. Are you aware of any guarantee contracts? If so,
please provide further details N/A
7. Are you aware of the existence of loss contingencies
and/or un-asserted claims that may affect the financial
statements? If so, please provide further details
N/A
8. Other than in house solicitors, can you provide details
of those solicitors utilised by Moray Council during the
year. Please indicate where they are working on open
litigation or contingencies from prior years?
Separate working provided on this in response to another request.
7
Page 131

Page 132

© 2023 Grant Thornton UK LLP | Moray Council 2022/23
Commercial in confidence
General Enquiries of Management
Question Management response
9. Have any of the Moray Council’s service providers
reported any items of fraud, non-compliance with laws
and regulations or uncorrected misstatements which
would affect the financial statements? If so, please
provide further details
Not aware of any instances of Fraud.
10. Can you provide details of other advisors consulted
during the year and the issue on which they were
consulted?
Mercer for Actuarial Services in relation to IAS 19 Employee Benefits.
Arlingclose – Treasury Management Advisers and also engaged specifically on the changes to Service
Concession Arrangements in Scotland.
11. Have you considered and identified assets for which
expected credit loss provisions may be required under
IFRS 9, such as debtors (including loans) and
investments? If so, please provide further details
Bad Debt Provision for Trade Debtors, Council Tax and Housing Rents will be processed as normal.
No further allowance anticipated in 2022/23.
8
Page 132

Page 133

© 2023 Grant Thornton UK LLP | Moray Council 2022/23
Commercial in confidence
Fraud
Matters in relation to fraud
ISA (UK) 240 covers auditors responsibilities relating to fraud in an audit of financial statements.
The primary responsibility to prevent and detect fraud rests with both the Audit and Scrutiny Committee and management. Management,
with the oversight of the Audit and Scrutiny Committee, needs to ensure a strong emphasis on fraud prevention and deterrence and
encourage a culture of honest and ethical behaviour. As part of its oversight, the Audit and Scrutiny Committee should consider the potential
for override of controls and inappropriate influence over the financial reporting process.
As Moray Council’s external auditor, we are responsible for obtaining reasonable assurance that the financial statements are free from
material misstatement due to fraud or error. We are required to maintain professional scepticism throughout the audit, considering the
potential for management override of controls.
As part of our audit risk assessment procedures we are required to consider risks of fraud. This includes considering the arrangements
management has put in place with regard to fraud risks including:
• assessment that the financial statements could be materially misstated due to fraud,
• process for identifying and responding to risks of fraud, including any identified specific risks,
• communication with the Audit and Scrutiny Committee regarding its processes for identifying and responding to risks of fraud, and
• communication to employees regarding business practices and ethical behaviour.
We need to understand how the Audit and Scrutiny Committee oversees the above processes. We are also required to make inquiries of
both management and the Audit and Scrutiny Committee as to their knowledge of any actual, suspected or alleged fraud. These areas have
been set out in the fraud risk assessment questions below together with responses from Moray Council’s management.
9
Page 133

Page 134

© 2023 Grant Thornton UK LLP | Moray Council 2022/23
Commercial in confidence
Fraud risk assessment
Question Management response
1. Has Moray Council assessed the risk of material
misstatement in the financial statements due to fraud?
How has the process of identifying and responding to
the risk of fraud been undertaken and what are the
results of this process?
How do Moray Council’s risk management processes
link to financial reporting?
The Council has established risk management, governance and operating procedures to mitigate the
risk of material misstatement in the financial statements. 
The Corporate Risk Register detailing the Council’s principal risks is reviewed by CMT/SMT on a 6
monthly basis with an annual report provided to elected members. Services are also required to maintain
risk registers detailing identifiable risks and mitigating controls. In addition, the Audit and Risk Manager
prepares a risk-based audit plan which considers the Council’s strategic objectives, associated risks and
the views of senior management.
2. What have you determined to be the classes of
accounts, transactions and disclosures most at risk to
fraud?
A risk register is maintained by Accountancy recording risks, controls, etc. In addition, Internal Audit will
also review and test transactions to ensure compliance with Council Regulations and  Procedures. The
use of IDEA, a computer assisted software system is used to analyse and select a sample for testing.
3. Are you aware of any instances of actual, suspected
or alleged fraud, errors or other irregularities either
within Moray Council as a whole, or within specific
departments since 1 April 2022? If so, please provide
details
No irregularity noted below the £5000 reporting threshold.
10
Page 134

Page 135

© 2023 Grant Thornton UK LLP | Moray Council 2022/23
Commercial in confidence
Fraud risk assessment
Question Management response
4. As a management team, how do you communicate
risk issues (including fraud) to those charged with
governance?                                                                                        
The Council’s Financial Regulations require all irregularities to be reported to the Audit and Risk Manager.
Principal risks facing the Council are reviewed on a 6 monthly basis by CMT/SMT and the Corporate Risk
Register is then updated accordingly.
5. Have you identified any specific fraud risks? If so,
please provide details
Do you have any concerns there are areas that are at
risk of fraud?
Are there particular locations within Moray Council
where fraud is more likely to  occur?
Specific concerns have been raised regarding the threat of a successful cyber attack. The risk has been
discussed by CMT/ SMT and a section for Information Technology is included in the Corporate Risk
Register. In addition, as part of the risk-based approach to preparing the Annual Audit Plan, an internal audit
review has been undertaken regarding the Council’s cyber security controls.
An overtime irregularity was also noted within Building Services involving two officers where a special
investigation was undertaken by the Internal Audit Section. As a result, the Internal Audit Section also
undertook a review of overtime payroll processing procedures that resulted in the introduction of additional
processing controls.
6. What processes do Moray Council have in place to
identify and respond to risks of fraud? Financial Regulations detail that all staff irregularities should be reported to the Audit and Risk Manager.
This is supported by the Policy to Combat Fraud, Theft, Bribery and Corruption and the Whistleblowing
Policy. In addition, the Council participates in the National Fraud Initiative data matching exercise, and also
publicises a point of contact to report fraud or irregularities involving the misuse of council resources.
11
Page 135

Page 136

© 2023 Grant Thornton UK LLP | Moray Council 2022/23
Commercial in confidence
Fraud risk assessment
Question Management response
7. How do you assess the overall control environment for Moray
Council, including:
• the existence of internal controls, including segregation of
duties; and
• the process for reviewing the effectiveness the system of
internal control? 
If internal controls are not in place or not effective where are the
risk areas and what mitigating actions have been taken?
What other controls are in place to help prevent, deter or detect
fraud?
Are there any areas where there is a potential for override of
controls or inappropriate influence over the financial reporting
process (for example because of undue pressure to achieve
financial targets)? If so, please provide details
The responsibility for developing and maintaining sound control environment rests with
management. However, the Audit and Risk Manager prepares a risk-based audit plan
which considers the Council’s strategic objectives and associated risks. While the
prevention of fraud and error rests with management through the design and operation of
suitable systems of control, reviews undertaken by Internal Audit will make
recommendations to improve the control environment. Internal Audit also coordinates the
Council’s participation in the National Fraud Initiative, a data matching exercise involving
a range of public sector bodies. This activity is viewed as complementary to other audit
activities, and participation assists Internal Audit in assessing the potential for the
occurrence of fraud and related fraud risk. Testing will primarily be undertaken by the
Services, with Internal Audit undertaking an overview of the process.
In accordance with an Audit and Scrutiny Committee Report, the Internal Audit Section
reviewed the key fraud risks identified within an Audit Scotland Report – Fraud &
Irregularity. Findings detailing risks, mitigating controls and responsible officer(s) were
reported to the Information Assurance Group.
8. Are there any areas where there is potential for misreporting? If
so, please provide details
None noted.
12
Page 136

Page 137

© 2023 Grant Thornton UK LLP | Moray Council 2022/23
Commercial in confidence
Fraud risk assessment
Question Management response
9. How does Moray Council communicate and
encourage ethical behaviours and business
processes of it’s staff and contractors?
How do you encourage staff to report their concerns
about fraud?
What concerns are staff expected to report about
fraud? Have any significant issues been reported? If
so, please provide details
The Council has a Policy to Combat Fraud, Theft, Bribery and Corruption. This policy is built around a
counter fraud culture supported by practices to deter and detect fraudulent and corrupt activities. It takes
account of the Council’s statutory obligations, including, and in particular, the provisions of the Bribery
Act 2010.
The Council has a statutory responsibility to make arrangements for the administration of its financial
affairs under the direction of a proper officer - the Chief Financial Officer. The Council has incorporated
within its standing orders and procurement procedures, arrangements in respect of contracts for the
supply of services, goods or materials and the execution of works. These ensure that established and
consistent contracting procedures are available for use by the Council, and all procuring officers are
either fully trained or are given support by Procurement Officers as part of the Supported Tender
Process.
The Audit and Scrutiny Committee has a remit which includes ensuring that the highest standards of
probity and public accountability are demonstrated. This involves oversight of internal control processes
as a contribution to good governance and generally supporting an anti-fraud, theft, corruption, and
bribery culture. This Committee considers reports produced by Internal and External Audit on the
Council’s systems; reports which include recommendations to strengthen internal controls and in turn
reduce the risk of fraud and related behaviours going undetected.
.As detailed previously, Managers have an ongoing responsibility for implementing effective systems of
control which secure the legitimacy of expenditure, the safeguarding of assets and income, the reliability
of management information, the accuracy of record keeping and compliance with statutory guidance.
They also have a responsibility to communicate this policy to their staff and ensure established systems
are followed.
Financial Regulations detail that all irregularities should be reported to the Audit and Risk Manager. In
addition, a Confidential ‘whistle blowing’ policy and procedure is in place, enabling employees to raise
any concerns about any aspect of the Council’s work without fear of victimisation, subsequent
discrimination or disadvantage, and in the knowledge that such concerns will be properly investigated.
13
Page 137

Page 138

© 2023 Grant Thornton UK LLP | Moray Council 2022/23
Commercial in confidence
Fraud risk assessment
Question Management response
12. What arrangements are in place to report fraud
issues and risks to the Audit and Scrutiny
Committee?
How does the Audit and Scrutiny Committee
exercise oversight over management's processes
for identifying and responding to risks of fraud and
breaches of internal control?
What has been the outcome of these arrangements
so far this year?
The Public Sector Internal Audit Standards (PSIAS) applicable to Local Government in Scotland requires
the Audit and Risk Manager to report functionally to the Audit and Scrutiny Committee on various issues
relative to the work of the Internal Audit Service, including special investigations.
The Audit and Scrutiny Committee has a remit which includes ensuring that the highest standards of
probity and public accountability are demonstrated. This involves oversight of internal control processes
as a contribution to good governance and generally supporting an anti-fraud, theft, corruption, and
bribery culture. This Committee considers reports produced by Internal and External Audit on the
Council’s systems; reports which include recommendations to strengthen internal controls and in turn
reduce the risk of fraud and related behaviours going undetected. Functions and makeup of the Audit
and Scrutiny Committee have also been recently reviewed and updated to reflect the requirements of the
Chartered Institute of Public Finance and Accountancy (CIPFA) Position Statement: Audit Committees in
Local Authorities and Police 2022
13. Are you aware of any whistle blowing potential
or complaints by potential whistle blowers? If so,
what has been your response?
None noted
14. Have any reports been made under the Bribery
Act? If so, please provide details
None noted
14
Page 138

Page 139

© 2023 Grant Thornton UK LLP | Moray Council 2022/23
Commercial in confidence
Law and regulations
Matters in relation to laws and regulations
ISA (UK) 250 requires us to consider the impact of laws and regulations in an audit of the financial statements.
Management, with the oversight of the Audit and Scrutiny Committee, is responsible for ensuring that Moray Council’s operations are conducted in
accordance with laws and regulations, including those that determine amounts in the financial statements.
As auditor, we are responsible for obtaining reasonable assurance that the financial statements are free from material misstatement due to fraud or
error, taking into account the appropriate legal and regulatory framework. As part of our risk assessment procedures we are required to make
inquiries of management and the Audit and Scrutiny Committee as to whether the body is in compliance with laws and regulations. Where we
become aware of non-compliance or suspected non-compliance we need to gain an understanding of the non-compliance and the possible effect
on the financial statements.
Risk assessment questions have been set out below together with responses from management.
15
Page 139

Page 140

© 2023 Grant Thornton UK LLP | Moray Council 2022/23
Commercial in confidence
Impact of laws and regulations
Question Management response
1. How does management gain assurance that all relevant laws
and regulations have been complied with?
What arrangements does Moray Council have in place to
prevent and detect non-compliance with laws and regulations?
Are you aware of any changes to the Authority’s regulatory
environment that may have a significant impact on the
Authority’s financial statements?
Generally speaking each service area (for example planning, procurement, social work) are
familiar with the statutory regime in which they operate and will keep up to speed with
developments through their professional associations such as CIPFA or SOLAR.
Changes to legislation, consultations and guidance are notified to the Council by the
Scottish Government and are distributed to the relevant departmental area.
The legal section has teams which specialise in different areas of Council activity and will be
involved (at the request of client departments) in the implementation of more complex
changes (such as formation of the IJB) and in any areas where legislation is unclear.
Legal compliance will often be subject to external regulation (for example data protection).
The Councils Scheme of Delegation (detailing the powers given to officers to implement
services under specified legislation) is reviewed annually in line with revised legislative
powers, in consultation with client departments.
2. How is the Audit and Scrutiny Committee provided with
assurance that all relevant laws and regulations have been
complied with?
The Councils Scheme of Delegation (detailing the powers given to officers to implement
services under specified legislation) is reviewed annually in line with revised legislative
powers, in consultation with client departments.
3. Have there been any instances of non-compliance or
suspected non-compliance with laws and regulation since 1
April 2022 with an on-going impact on the 2022/23 financial
statements? If so, please provide details
The Council is currently being challenged on its Records Management Plan by the Keeper of
the Records of Scotland.
Not aware of other instances.
4. Are there any actual or potential litigation or claims that Statutory Appeal in the Court of Session in respect of an LRB decision in regard to
16
Page 140

Page 141

© 2023 Grant Thornton UK LLP | Moray Council 2022/23
Commercial in confidence
Impact of laws and regulations
Question Management response
5. What arrangements does Moray Council have in
place to identify, evaluate and account for litigation
or claims?
The legal section has teams which specialise in different areas of Council activity and will be involved (at
the request of client departments) in the implementation of more complex changes (such as formation of
the IJB) and in any areas where legislation is unclear.
Where necessary external advise will be sought.
6. Have there been any reports from other regulatory       
bodies, such as HM Revenues and Customs, which
indicate non-compliance? If so, please provide
details
The Council is currently being challenged on its Records Management Plan by the Keeper of the
Records of Scotland.
17
Page 141

Page 142

© 2023 Grant Thornton UK LLP | Moray Council 2022/23
Commercial in confidence
Related Parties
Matters in relation to Related Parties
Moray Council are required to disclose transactions with bodies/individuals that would be classed as related parties.  These may include:
■ bodies that directly, or indirectly through one or more intermediaries, control, or are controlled by Moray Council;
■ associates;
■ joint ventures;
■ a body that has an interest in the authority that gives it significant influence over the Authority;
■ key management personnel, and close members of the family of key management personnel, and
■ post-employment benefit plans (pension fund) for the benefit of employees of the Authority, or of any body that is a related party of the
Authority.
A disclosure is required if a transaction (or series of transactions) is material on either side, i.e. if a transaction is immaterial from the Authority’s
perspective but material from a related party viewpoint then the Authority must disclose it.
ISA (UK) 550 requires us to review your procedures for identifying related party transactions and obtain an understanding of the controls that you
have established to identify such transactions. We will also carry out testing to ensure the related party transaction disclosures you make in the
financial statements are complete and accurate.
18
Page 142

Page 143

© 2023 Grant Thornton UK LLP | Moray Council 2022/23
Commercial in confidence
Related Parties
Question Management response
1. Have there been any changes in the related
parties including those disclosed in Moray Council’s
2021/22 financial statements?
If so please summarise:
• the nature of the relationship between these
related parties and Moray Council
• whether Moray Council has entered into or plans
to enter into any transactions with these related
parties
• the type and purpose of these transactions
No changes since 2021/22.
2. What controls does Moray Council have in place
to identify, account for and disclose related party
transactions and relationships?
Senior Officers and Elected Members make annual returns and any significant factors that arise as part
of this process would be factored into the Related Parties Note in the Annual Accounts.
3. What controls are in place to authorise and
approve significant transactions and arrangements
with related parties?
Normal procedures following the Authorisation policy would apply – transactions over £25,000 are
checked by the Chief Financial Officer.
4. What controls are in place to authorise and
approve significant transactions outside of the
normal course of business?
For significant transactions that are new and outside the normal course of business Committee approval
is required.
19
Page 143

Page 144

© 2023 Grant Thornton UK LLP | Moray Council 2022/23
Commercial in confidence
Going Concern
Matters in relation to Going Concern
The audit approach for going concern is based on the requirements of ISA (UK) 570, as interpreted by Practice Note 10: Audit of financial
statements and regularity of public sector bodies in the United Kingdom (Revised 2020). It also takes into account the National Audit Office's
Supplementary Guidance Note (SGN) 01: Going Concern – Auditors’ responsibilities for local public bodies.
Practice Note 10 confirms that in many (but not all) public sector bodies, the use of the going concern basis of accounting is not a matter of
significant focus of the auditor’s time and resources because the applicable financial reporting frameworks envisage that the going concern basis
for accounting will apply where the body’s services will continue to be delivered by the public sector. In such cases, a material uncertainty related
to going concern is unlikely to exist.
For this reason, a straightforward and standardised approach to compliance with ISA (UK) 570 will often be appropriate for public sector bodies.
This will be a proportionate approach to going concern based on the body’s circumstances and the applicable financial reporting framework. In
line with Practice Note 10, the auditor’s assessment of going concern should take account of the statutory nature of the body and the fact that the
financial reporting framework for central government bodies presume going concern in the event of anticipated continuation of provision of the
services provided by the body. Therefore, the public sector auditor applies a ‘continued provision of service approach’, unless there is clear
evidence to the contrary. This would also apply even where those services are planned to transfer to another body, as in such circumstances, the
underlying services will continue.
For many public sector bodies, the financial sustainability of the body and the services it provides are more likely to be of significant public
interest than the application of the going concern basis of accounting. Financial sustainability is a key component of wider scope and best value
work and it is through such work that it will be considered.
Page 144

Page 145

© 2023 Grant Thornton UK LLP | Moray Council 2022/23
Commercial in confidence
Going Concern
Question Management response
1. What processes and controls does management have
in place to identify events and / or conditions which may
indicate that the statutory services being provided by
Moray Council will no longer continue?
Regular reporting on the Council’s finances would highlight any conditions which may meant he
Council is no longer to deliver statutory duties. Regular performance reports to Service Committees
would highlight this as well.
2. Are management aware of any factors which may
mean for Moray Council that either statutory services will
no longer be provided or that funding for statutory
services will be discontinued? If so, what are they?
Not aware of any factors.
3. With regard to the statutory services currently
provided by Moray Council, does Moray Council expect
to continue to deliver them for the foreseeable future, or
will they be delivered by related public authorities if there
are any plans for Moray Council to cease to exist?
It is expected that the Council will continue to deliver statutory services.
4. Are management satisfied that the financial reporting
framework permits Moray Council to prepare its financial
statements on a going concern basis? Are management
satisfied that preparing financial statements on a going
concern basis will provide a faithful representation of the
items in the financial statements?
The annual accounts will be prepared on a going concern basis and this will provide a faithful
representation of the items included in the financial statements.
Page 145

Page 146

© 2023 Grant Thornton UK LLP | Moray Council 2022/23
Commercial in confidence
Accounting estimates
Matters in relation to accounting estimates
ISA (UK) 540 (Revised December 2018)  requires auditors to understand and assess a body’s internal controls over accounting estimates,
including:
• The nature and extent of oversight and governance over management’s financial reporting process relevant to accounting estimates;
• How management identifies the need for and applies specialised skills or knowledge related to accounting estimates;
• How the body’s risk management process identifies and addresses risks relating to accounting estimates;
• The body’s information system as it relates to accounting estimates;
• The body’s control activities in relation to accounting estimates; and
• How management reviews the outcomes of previous accounting estimates.
As part of this process auditors also need to obtain an understanding of the role of those charged with governance, which is particularly important
where the estimates have high estimation uncertainty, or require significant judgement.
Specifically do Audit and Scrutiny Committee members:
• Understand the characteristics of the methods and models used to make the accounting estimates and the risks related to them;
• Oversee management’s process for making accounting estimates, including the use of models, and the monitoring activities undertaken by
management; and
• Evaluate how management made the accounting estimates?
We would ask the Audit and Scrutiny Committee to satisfy itself that the arrangements for accounting estimates are adequate.
22
Page 146

Page 147

© 2023 Grant Thornton UK LLP | Moray Council 2022/23
Commercial in confidence
Accounting Estimates - General Enquiries of Management
Question Management response
1. What are the classes of transactions, events and
conditions, that are significant to the financial
statements that give rise to the need for, or changes in,
accounting estimate and related disclosures?
Valuation of Property, Plant & Equipment
Valuation of Pension Liability
2. How does the Authority’s risk management process
identify and address risks relating to accounting
estimates?
By engaging with experts in each of the areas identified the risk of material misstatement is reduced.
3. How does management identify the methods,
assumptions or source data, and the need for changes
in them, in relation to key accounting estimates?
The results of prior year audits are looked at and whether there was any material concerns raised or
amendments made – in those instances accounting estimates would be reviewed.
4. How do management review the outcomes of
previous accounting estimates? The results of prior year audits are looked at and whether there was any material concerns raised or
amendments made – in those instances accounting estimates would be reviewed.
5. Were any changes made to the estimation processes
in 2022/23 and, if so, what was the reason for these? No changes were made in 2022/23.
Page 147

Page 148

© 2023 Grant Thornton UK LLP | Moray Council 2022/23
Commercial in confidence
Accounting Estimates - General Enquiries of Management
Question Management response
6. How does management identify the need for and
apply specialised skills or knowledge related to
accounting estimates?
Each area is looked at in isolation and the skills/knowledge/capacity of relevant Services considered.
7. How does the Authority determine what control
activities are needed for significant accounting
estimates, including the controls at any service
providers or management experts?
Ensuring that relevant information is provided on time and accurately to ensure that the information received
can be relied upon.
8. How does management monitor the operation of
control activities related to accounting estimates,
including the key controls at any service providers or
management experts?
Regular updates provided by preparers of the Accounts on any issues that arise.
9. What is the nature and extent of oversight and
governance over management’s financial reporting
process relevant to accounting estimates, including:
- Management’s process for making significant
accounting estimates
- The methods and models used
- The resultant accounting estimates included in the
financial statements.
The unaudited accounts are reported to Committee and then again upon completion of the audit. External
Audit reporting also helps to inform on estimates.
Page 148

Page 149

© 2023 Grant Thornton UK LLP | Moray Council 2022/23
Commercial in confidence
Accounting Estimates - General Enquiries of Management
Question Management response
10. Are management aware of any transactions,
events, conditions (or changes in these) that may
give rise to recognition or disclosure of significant
accounting estimates that require significant
judgement (other than those in Appendix A)? If so,
what are they?
Not aware of any additional areas where new estimates would be required to be disclosed.
11. Why are management satisfied that their
arrangements for the accounting estimates, as
detailed in Appendix A, are reasonable?
No major changes required to annual accounts in previous years.
12. How is the Audit and Scrutiny Committee
provided with assurance that the arrangements for
accounting estimates are adequate?
Annual accounts are reported to Full Council.
25
Page 149

Page 150

© 2023 Grant Thornton UK LLP | Moray Council 2022/23
Commercial in confidence
Appendix A Accounting Estimates
Estimate Method / model used to
make the estimate
Controls used to
identify estimates
Whether
management
have used an
expert
Underlying assumptions:
- Assessment of degree of uncertainty
- Consideration of alternative
estimates
Has there
been a
change in
accounting
method in
year?
Land and
buildings
valuations
Infrastructure/Community
Assets/AUC – DHC
Schools – DRC
Surplus Assets – Fair Value
Council Dwellings - EUV
Information used is
industry standard
information from entities
such us BCIS.
Internal Valuers No.
Valuation of
defined benefit
net pension fund
liabilities
Based on information from
Actuaries.
Information provided to
actuaries based on year
end position reducing
the need for use of
estimates.
Yes. Disclosure in accounts regarding the
changes that could happen and the
impact it would have on the figues
included in the accounts
No.
Heritage assets
valuations
Insurance Valuations/Historic
Cost
Yes. No.
Depreciation
Straight Line method over the
useful life of the asset.
Estates provide useful
life estimates.
Internal Valuers No
26
Page 150

Page 151

© 2023 Grant Thornton UK LLP | Moray Council 2022/23
Commercial in confidence
Appendix A Accounting Estimates
Estimate Method / model used to
make the estimate
Controls used to
identify estimates
Whether
management
have used an
expert
Underlying assumptions:
- Assessment of degree of uncertainty
- Consideration of alternative
estimates
Has there
been a
change in
accounting
method in
year?
Investment
property
revaluations
Fair Value Per the Code –
Investment Property
reviewed annually.
Internal Valuers No alternative considered – prescriptive
by the Code.
No.
Provisions Only 1 provision – amount
based on actual amounts.
Liaison with HR. No. Based on information from HR –
confirmed each year that it is still at an
appropriate level
No
Accruals Based on actual entries in the
ledger, or on information
received from departments.
No but in some
cases estimates
are made by
Quantity
Surveyors.
In most cases based on actual ledger
entries so no estimation.
Where estimates are provided we know it
will be based on professional judgement
and we would query if it was materially
different from estimates provided.
No.
Credit loss and 
impairment
allowances
Bad Debt Provision – debtors,
council tax, housing rents.
Debtors/Housing Rents:
>12 months – provided
in full
6-12 months – 50%
<6 months – 0%
Council Tax:
<12 months – 0%
>12 months – 100%
No. Looked at and reviewed each year to see
if the percentages are still appropriate.
No.
27
Page 151

Page 152

© 2023 Grant Thornton UK LLP | Moray Council 2022/23
Commercial in confidence
Appendix A Accounting Estimates (Continued)
Estimate Method / model used to
make the estimate
Controls used to
identify estimates
Whether
management have
used an expert
Underlying
assumptions:
- Assessment of degree
of uncertainty
- Consideration of
alternative estimates
Has there been a
change in
accounting
method in year?
Accrued Income Based on actual entries in
the ledger, or on
information received from
departments
No. In most cases based on
actual ledger entries so no
estimation.
Where estimates are
provided we know it will be
based on professional
judgement and we would
query if it was materially
different from estimates
provided.
No.
PFI Liabilities Financial models are used
each year.
Financial models are
well established and
were set up in
conjunction with
experts and have
been audited in detail
since then.
Models used were
set up in conjunction
with experts – annual
use is by Council
staff.
No changes considered –
processes well
established.
No.
Fair Value of
Assets and
Liabilities (Financial
Instruments)
In most cases the fair
value is calculated using
models provided by the
Council’s Treasury
Management Advisers.
Use of external
expert information.
Yes. No.
28
Page 152

Page 153

© 2023 Grant Thornton UK LLP
‘Grant Thornton’ refers to the brand under which the Grant Thornton member firms provide assurance, tax and advisory services to their clients and/or refers to
one or more member firms, as the context requires. Grant Thornton UK LLP is a member firm of Grant Thornton International Ltd (GTIL). GTIL and the member
firms are not a worldwide partnership. GTIL and each member firm is a separate legal entity. Services are delivered by the member firms. GTIL does not
provide services to clients. GTIL and its member firms are not agents of, and do not obligate, one another and are not liable for one another’s acts or omissions.