Agenda Document Pack - Audit and Scrutiny Committee - 10/09/2025
Moray Council · 10 September 2025
Back to Audit and Scrutiny Committee — 10 September 2025 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Page 1
Audit and Scrutiny Committee Wednesday, 10 September 2025 NOTICE IS HEREBY GIVEN that a Meeting of the Audit and Scrutiny Committee is to be held at Council Chambers, Council Office, High Street, Elgin, IV30 1BX on Wednesday, 10 September 2025 at 09:30. BUSINESS 1. Sederunt 2. Declaration of Group Decisions and Members Interests * 3. Resolution Consider, and if so decide, adopt the following resolution: "That under Section 50A (4) and (5) of the Local Government (Scotland) Act 1973, as amended, the public and media representatives be excluded from the meeting for Items 10 and 11 of business on the grounds that it involves the likely disclosure of exempt information of the class described in the relevant Paragraphs of Part 1 of Schedule 7A of the Act.” 4. Minute of meeting of 24 June 2025 7 - 14 5. Written Questions ** 6. Internal Audit Section Update Report Report by Service Manager Internal Audit and Risk 15 - 26 7. Internal Audit Review - Banking and Reconciliation Report by Service Manager Internal Audit and Risk 27 - 40 8. Internal Audit Review - Residential Care Report by Service Manager Internal Audit and Risk 41 - 66 Page 1
Page 2
9. Public Sector Internal Audit Standards - External Quality Assessment of the Internal Audit Section - Follow Up Review Report by Service Manager Internal Audit and Risk 67 - 90 Item(s) which the Committee may wish to consider with the Press and Public excluded 10. Internal Audit Review - Secondary School Buildings and Grounds Security [Para 14] • 14. Information relating to action taken, or to be taken, in connection with the prevention, investigation or prosecution of crime. 11. Internal Audit Follow Up Review - St Giles Shopping Centre - Non-Domestic Rates [Para 6] • 6. Information relating to the financial or business affairs of any particular person(s); Summary of Audit and Scrutiny Committee functions: Audit Functions - Consider reports from the Council's internal auditor & Audit Scotland concerning Council Functions. Scrutiny Functions - Scrutinising the policies of the Council and their effectiveness in meeting the action plans of the Council as set out in the Corporate Development Plan and evaluating the actions of Committees in implementing the action plans set out in the Corporate Development Plan. Performance Monitoring - To receive reports on the performance of and trends within all of the Council’s services in terms of service standards and performance information. Standards - To ensure that the highest standards of probity and public accountability are demonstrated. Page 2
Page 3
Watching the Meeting You can watch the webcast live by going to: http://www.moray.gov.uk/moray_standard/page_43661.html Webcasts are available to view for 1 year following the meeting. You can also attend the meeting in person. If you wish to attend in person, please come to the High Street entrance door and a member of staff will let you into the Chamber. Page 3
Page 4
GUIDANCE NOTES * Declaration of Group Decisions and Members Interests - The Chair of the meeting shall seek declarations from any individual or political group at the beginning of a meeting whether any prior decision has been reached on how the individual or members of the group will vote on any item(s) of business on the Agenda, and if so on which item(s). A prior decision shall be one that the individual or the group deems to be mandatory on the individual or the group members such that the individual or the group members will be subject to sanctions should they not vote in accordance with the prior decision. Any such prior decisions will be recorded in the Minute of the meeting. ** Written Questions - Any Member can put one written question about any relevant and competent business within the specified remits not already on the agenda, to the Chair provided it is received by the Proper Officer or Committee Services by 5pm three working days prior to the day of the meeting, please see Standing Order 36 for deadlines. A copy of any written answer provided by the Chair will be published on the Council’s committee management system by 12pm the day before the meeting. The Member who has put the question may, after the answer has been published, may ask one supplementary question directly related to the subject matter at the meeting, but no discussion will be allowed. No supplementary question can be put or answered more than 10 minutes after the Council has started on the relevant item of business, except with the consent of the Chair. If a Member does not have the opportunity to put a supplementary question because no time remains, then he or she can submit it in writing to the Proper Officer who will arrange for a written answer to be provided within 7 working days. Page 4
Page 5
MORAY COUNCIL Audit and Scrutiny Committee SEDERUNT Councillor Scott Lawrence (Chair) Councillor Theresa Coull (Depute Chair) Councillor Peter Bloomfield (Member) Councillor Tracy Colyer (Member) Councillor John Divers (Member) Councillor Jérémie Fernandes (Member) Councillor Donald Gatt (Member) Councillor David Gordon (Member) Councillor Sandy Keith (Member) Councillor Marc Macrae (Member) Councillor Paul McBain (Member) Councillor Neil McLennan (Member) Councillor John Stuart (Member) Councillor Sonya Warren (Member) Mr Ivan Augustus (Non-Voting Member) Ms Margaret Wilson (Non-Voting Member) Clerk Name: Caroline O'Connor Clerk Telephone: 07779 999296 Clerk Email: committee.services@moray.gov.uk Page 5
Page 6
Page 6
Page 7
MORAY COUNCIL Minute of Meeting of the Audit and Scrutiny Committee Tuesday, 24 June 2025 Council Chambers, Council Office, High Street, Elgin, IV30 1BX PRESENT Mr Ivan Augustus, Councillor Peter Bloomfield, Councillor Tracy Colyer, Councillor Theresa Coull, Councillor John Divers, Councillor Jérémie Fernandes, Councillor Donald Gatt, Councillor David Gordon, Councillor Sandy Keith, Councillor Scott Lawrence, Councillor Marc Macrae, Councillor Paul McBain, Councillor John Stuart, Councillor Sonya Warren, Ms Margaret Wilson APOLOGIES Councillor Neil McLennan IN ATTENDANCE Chief Executive; Depute Chief Executive (Education, Communities and Organisational Development); Depute Chief Executive (Economy, Environment and Finance); Chief Officer, Health and Social Care Moray; Audit and Risk Manager; Head of Housing and Property Services; DLO Manager; Head of Education; Head of Human Resources, ICT and Organisational Development; ICT Team Leader (Cyber Resilience and Information Security); Business Continuity and Risk Management Officer and Caroline O'Connor, Committee Services Officer, all Moray Council; and Angela Pieri and Andrew Wallace, Grant Thornton - External Auditors. ALSO IN ATTENDANCE Councillor Amber Dunbar 1. Chair The meeting was chaired by Councillor Scott Lawrence. 2. Declaration of Group Decisions and Members Interests * In terms of Standing Orders 21 and 23 and the Councillors' Code of Conduct, there were no declarations from Group Leaders or Spokespersons in regard to any prior decisions taken on how Members will vote on any item on the agenda or any declarations of Member's interests in respect of any item on the agenda. With regard to Item 6 "Internal Audit Annual Report 2024-25", Councillor Gatt stated, for transparency, that he is Convener of the Grampian Valuation Joint Board and would be taking part in the debate. Item 4. Page 7
Page 8
With regard to Item 6 "Internal Audit Annual Report 2024-25", Councillor Warren and Councillor Macrae stated, for transparency that they were members of the Grampian Valuation Joint Board and would be taking part in the debate. With regard to Item 6 "Internal Audit Annual Report 2024-25" and Item 7 "Internal Audit Section Update Report", Mr Augustus stated, for transparency, that he was carer representative on the Moray Integration Joint Board and would be taking part in the debate. 3. Resolution The meeting resolved that in terms of Section 50A (4) and (5) of the Local Government (Scotland) Act 1973, as amended, the public and media representatives be excluded from the meeting for Item 13 of business on the grounds that it involves the likely disclosure of exempt information of the class described in the relevant Paragraphs of Part 1 of Schedule 7A of the Act. Para Number of the Minute Para Number of Schedule 7a 13 Para 14 Information relating to any action taken in connection with the prevention, investigation or prosecution of crime 4. Minute of meeting of 7 May 2025 The minute of the meeting of 7 May 2025 was submitted and approved. 5. Written Questions ** The Committee noted that no written questions had been submitted. 6. Internal Audit Annual Report 2024-25 The meeting had before it a report by the Audit and Risk Manager providing Committee with a copy of the Internal Audit Annual Report for the year ended 31 March 2025, together with the Audit and Risk Manager's opinion on the adequacy and effectiveness of the Council's systems of governance, risk management and internal control arrangements. Mr Augustus expressed concern at the growing burdens being placed on Internal Audit associated with work for the Moray Integration Joint Board (MIJB) and the difficulties experienced in recruiting an Assistant Auditor referenced at paragraph 3.18 of Appendix 1 and asked how the service would cope with the apparent growth items in the annual plan. In response, the Audit and Risk Manager confirmed that current resources were a concern in terms of the expanding portfolio of the service, in addition to the continued need to undertake additional follow-up reviews to evidence the implementation of the recommendations. There have also been more specific concerns related to the annual opinion regarding systems and practices that were reported to the MIJB Audit, Performance and Risk Committee the previous week. Page 8
Page 9
The Chief Executive further advised that while recruitment was part of the approach, it was also important to work with the management team to ensure audit recommendations are implemented to reduce workload on the service in terms of reduced follow-up audits, and work would be undertaken to ensure agreed recommendations were deliverable in terms of the agreed response and timescale. In response to a question from Councillor Keith asking when it was anticipated the improvements described by the Chief Executive would be evidenced by providing increased capacity within the Internal Audit service, the Chief Executive confirmed work would be undertaken with the management team over the coming months to consider existing recommendations along with how to improve responses to future audits. During discussion and in terms of the resource issues highlighted in the report by the Audit and Risk Manager, Councillor Stuart asked if there was any steps the Committee could take to seek more resources within the service to support the improvement of the Council. In response, the Chief Executive confirmed work would be undertaken with the Head of Governance, Strategy and Performance and Audit and Risk Manager as part of phase 2 of the restructure to consider the resources and whether there was scope for increased capacity, noting it would require to be taken in context of the Council's financial position. The Audit and Risk Manager stated that, in accordance with the Public Sector Internal Audit Standards, the head of internal audit is responsible for ensuring that internal audit resources are appropriate and sufficient. If the head of internal audit has concerns that resources will adversely impact the provision of the annual internal audit opinion, it must be brought to the attention of this Committee. The Audit and Risk Manager expressed his concerns again regarding the staffing resources of the internal audit service, which have also been raised by the External Auditor and the Chief Internal Auditor of another local authority during the external quality assessment of the Council’s internal audit service. Following consideration the Committee unanimously agreed to note the contents of the annual report given as Appendix 1. 7. Internal Audit Section Update Report The meeting had before it a report by the Audit and Risk Manager providing an update on the work of the Internal Audit Section. With reference to Recommendation 5.6 of Appendix 3, Councillor Bloomfield noted the initial implementation date for the agreed contractual agreement detailing service delivery had been extended resulting in an 18 month delay and asked for confirmation that the service had been operating during that time without a contract. In response, the Audit and Risk Manager confirmed the three daycare providers were moving forward in terms of a memorandum of understanding however agreed there was a need to move forward in terms of an agreed contractual relationship. In respect of the recommendations in the Self-Directed Support follow-up review referenced in Appendix 3 and noting some revised implementation dates, Mr Augustus stressed the importance of service users' views not only being taken in account but evidenced by recording along with clear information provided to service users on the contributions policy. In response, the Chief Officer, Health and Social Page 9
Page 10
Care Moray welcomed the support from Internal Audit in terms of improvement within the partnership and, in order to provide assurance, confirmed significant work was being undertaken around all Self-Directed Support options to deliver the improvements detailed in the recommendations to close off the action. Following consideration the Committee unanimously agreed to note the contents of the report. 8. Internal Audit Review - Building Services - Reactive Repairs The meeting had before it a report by the Audit and Risk Manager advising Committee on an internal audit review completed for the period from 7 May 2025 to 24 June 2025. In introducing the report, the Audit and Risk Manager apologised for an error in Recommendation 6 of Appendix 1 where the Audit Finding referenced monthly charges for October and November 2025 however this should have read October and November 2024. In relation to Recommendation 3 of Appendix 1, Councillor Warren asked whether the Council was legally compliant given 119 properties are without the required Gas Safety Certificate. In response, the Audit and Risk Manager confirmed the safety checks had been undertaken and the risk rating related to the administration process where the required documentation had not been passed from Building Services to Property Services in order to close off some conflicts where works were requested. He further advised whilst certificates are legislative requirements, there was a means of evidencing the work undertaken. In order to provide further assurance, the DLO Manager confirmed the service had now moved from a paper based system to an electronic system ensuring that PDF certificates are automatically added to files. Following consideration the Committee unanimously agreed to endorse the recommendations contained within the report. 9. Internal Audit Review - Keith Grammar School The meeting had before it a report by the Audit and Risk Manager advising Committee on an internal audit review completed for the period from 7 May 2025 to 24 June 2025. In relation to Recommendation 5 of Appendix 1 relating to the use of the iPayimpact system for collection and banking of income, Councillor Colyer asked why increased use of the system had been delayed. In response, the Audit and Risk Manager agreed there was a need to progress and that the benefits of the system would become evident to users moving forward. The Head of Education further advised the school had faced significant staffing challenges over the last year however provided assurance that learning from the individual audits was being shared with other schools and the service was ensuring the Business Support Team and Learning Technologist would support schools who wished to make better use of the system. With reference to Recommendation 2 of Appendix 1 regarding the purchase of supermarket vouchers from the Pupil Equity Fund (PEF), Councillor Warren expressed concern that as the vouchers had not been issued, the PEF money was not supporting those it was intended to support and asked what monitoring systems are Page 10
Page 11
in place within the Council to track and follow up on PEF spend in schools. In response, the Head of Education advised it is the responsibility of the Quality Improvement Manager (QIM) to oversee the Scottish Attainment Challenge funding which includes PEF. The QIM works closely with the Attainment Advisor, who in turn works with individual schools on their Pupil Equity Funding Plans which detail how the money will be spent along with the intended outcomes in terms of improving attainment and, while schools provide regular updates, progress of the Plans are also followed up by the QIM and the Attainment Advisor. Following consideration the Committee unanimously agreed to endorse the recommendations contained within the report. 10. Internal Audit Review - Information Communications Technology Hardware Assets The meeting had before it a report by the Audit and Risk Manager advising Committee on an internal audit review completed for the period from 7 May 2025 to 24 June 2025. With reference to the Key Issues section of Appendix 1 where it was stated that the Corporate Information Security Policy was last reviewed and updated in January 2009, Councillor Bloomfield asked for clarification why it had not been reviewed since then and in relation to Recommendation 5 of the Appendix expressed concern regarding there being not agreement with the 13 NHS Grampian employees within the Moray Integration Joint Board to confirm their requirement to comply with council policies. In response to the question relating to review of the policy, the Head of Human Resources, ICT and Organisational Development acknowledged the length of time since last reviewed however advised the practice was in line with current industry standards and confirmed the policy review was being progressed. In response to the question relating to compliance of the NHS Grampian employees, the ICT Team Leader (Cyber Resilience and Information Security) confirmed all MIJB staff are required to agree to the Computer Use Policy as part of the sign-in process being a prompt displayed on a regular basis which has to be accepted in order to continue using the device. During discussion and in order to provide further assurance, the Depute Chief Executive (Education, Communities and Organisational Development) confirmed cyber security training has been rolled out to all users to ensure staff are aware of the points relating to information security and noted in terms of actions within the audit, priority has been given to live operational issues to ensure they are addressed with the policy issues below in terms of resource allocation. Councillor Gatt acknowledged the assurance from officers that industry policies and standard are being adhered to however stressed the importance of being able to evidence adherence to policies. The Chief Executive confirmed work has commenced with managers to consider a programme to review all Council policies, how reviews should be prioritised and ensuring document control to evidence when the policies have been reviewed and amended. With reference to the Council using 100 servers as referenced in the Introduction and Audit Scope section of Appendix 1, Councillor Macrae was alarmed at the number of servers, suggesting the number was far too great for the size of the Council and, in terms of business recovery plans, questioned how it was possible to back these up Page 11
Page 12
on a daily basis. In response, the ICT Team Leader (Cyber Resilience and Information Security) confirmed there are 100 physical servers with automated backups being performed daily which are verified and replicated off site providing a separate copy for recovery purposes. Councillor Stuart left the meeting during discussion of this item. Following consideration the Committee unanimously agreed to endorse the recommendations contained within the report. 11. Audit and Scrutiny Committee - Self-Assessment and Evaluation Exercises The meeting had before it a report by the Audit and Risk Manager advising Committee on the outcome of a self-assessment of Compliance with the Good Practice Principles Checklist and Evaluation of the Effectiveness Toolkit undertaken from the Chartered Institute of Public Finance and Accountancy (CIPFA) Publication "Audit Committees: Practical Guidance for Local Authorities and Police 2022 Edition". With reference to Item 6 of Appendix 1 regarding concerns discussed about the lack of the scrutiny function of the Committee, Councillor Macrae asked when Councillors will be entitled to scrutiny. In response, the Chair confirmed some preliminary discussions had taken place with officers to discuss themes of scrutiny papers to be prepared for Committee, specifically for cross-cutting areas rather than areas within the remit of a service Committee and it was planned to bring two scrutiny papers to Committee within the next year. The Head of Governance, Strategy and Performance confirmed following on from the three scrutiny training sessions for Committee held over the last two years and results from the feedback survey on the training, an outcome was that members wanted regular training on scrutiny topics. He advised this would require a change to the Scheme of the Administration which would be done by October with a view to changing the Standing Orders by the end of the year. Following consideration the Committee unanimously agreed to endorse the recommendations contained within the report. 12. Annual Governance Statement The meeting had before it a report providing Committee with a copy of the Council's Annual Governance Statement for 2024/25 for review and approval. Following consideration the Committee unanimously agreed to note the draft Annual Governance Statement provided as Appendix 1. 13. Internal Audit Follow Up Review - Cyber Security and E-Mail Security [Para 14] The meeting had before it a report by the Audit and Risk Manager providing an update on a follow up review undertaken by the Internal Audit Section to evidence implementation of audit recommendations. Councillor Stuart entered the meeting during discussion of this item. Page 12
Page 13
Following consideration the Committee unanimously agreed to note the contents of the report. Page 13
Page 14
Page 14
Page 15
Report to: Audit and Scrutiny Committee Meeting Date: 10 September 2025 Report by: Service Manager Internal Audit and Risk Report No: GSP044/25/DL Author: Dafydd Lewis Contact Email: dafydd.lewis@moray.gov.uk Subject: Internal Audit Section Update Report 1. PURPOSE ☒ For Decision ☐ For Information 1.1 The purpose of this report is to provide an update on the work of the Internal Audit Section . 1.2 This report is submitted to Committee in terms of Section III (I) (2) and (8) of the Council’s Scheme of Administration relating to consideration of reports from the Council’s Internal Auditor and monitoring delivery of the audit service through receipt of quarterly reports on work carried out by Internal Audit. 2. SUMMARY 2.1 Public Sector Internal Audit Standards requires the Service Manager Internal Audit and Risk to prepare and present reports to Committee on internal audit’s activity, performance relative to its Audit Plan and any other relevant matters. 2.2 This report provides an update on audit activity and projects progressed since the last meeting. 3. RECOMMENDATIONS 3.1 It is recommended that Committee: i) Considers and notes the contents of this report, seek clarification on any points. Dafydd Lewis Service Manager Internal Audit and Risk Item 6. Page 15
Page 16
4. BACKGROUND AND CONTEXT Internal Audit Plan Update 4.1 The Audit Plan is a means of determining the priorities of the internal audit activity and how these align with the broader goals of the Council. Enclosed in Appendix 1 is an update on the progress made by the Internal Audit Section in completing audit review projects in accordance with the Annual Audit Plan. 4.2 The Public Sector Internal Audit Standards (PSIAS) requires the Service Manager for Internal Audit and Risk to update this Committee on any concerns regarding the level of audit staffing resources within the Internal Audit Section. In my Annual Report to this Committee on 24 June 2025 (paragraph 6 of the minute refers), I highlighted concerns about whether the current staffing levels within the Internal Audit Section are adequate to meet the future auditing needs of the Council and its partner organisations. I am pleased to report the successful appointment of a part-time temporary Auditor. This appointment should assist in meeting the increasing demands on the Service; however, a period of training will be required. The temporary post has been primarily funded from the remaining budget following the Council’s decision to reduce the vacant Corporate Investigation Officer position by 0.5 Full-Time Equivalent. The counter fraud responsibilities of that post will be integrated into the duties of other officers within the Internal Audit Section. Despite an overall reduction in staffing resources, this new appointment is expected to support a more effective delivery of the Annual Audit Plan. Follow Up Reviews 4.4 Internal Audit reports are regularly presented to members detailing not only findings but also the responses by management to the recommendations with agreed dates of implementation. Internal Audit will also undertake follow up reviews to evidence the effective implementation of these recommendations. Please see detailed the following completed follow up reviews: Data Protection 4.5 A follow up review was undertaken to evidence the implementation of recommendations from an audit that assessed the Council’s compliance with the Data Protection Act 2018. The audit was originally reported to this Committee on 15 February 2023 (para 7 of minute refers). It included several recommendations for reviewing and updating policies and guidance, as well as introducing further scrutiny and controls over information management arrangements. 4.6 A previous follow up review reported to this Committee on 8 May 2024 (para 5 of minute refers), found that the majority of recommendations had not been implemented within the agreed timescales. The Service advised that a multi-year timescale was required for implementing some of these recommendations due to the lack of staff resources to meet the ongoing volume of work and other information management compliance requirements, which were significantly greater than initially envisaged. However, for two of these recommendations concerning the need to update the Council’s Data Protection Policy and Guidance and to review the guidance documents and forms within the Information Management Section of the Interchange, the Service agreed to a revised completion date of 31 March 2025. Unfortunately, it was found at the time of this follow-up review that these Page 16
Page 17
two recommendations are still to be completed, with the Service providing a revised implementation date of 31 December 2025. 4.7 It is important that the Council maintains effective information governance and data protection arrangements, as failures may result in breaches of individuals' personal data. I do not propose undertaking another follow up review, but I will again include an audit of the Council’s compliance with the Data Protection Act 2018 in a future Internal Audit Annual Plan. However, it is recommended that the Service ensures progress continues in the implementation of the outstanding recommendations detailed within the audit report. Burials 4.8 A follow-up review has been undertaken to provide evidence of the implementation of recommendations from an audit report on the Burial Service. The scope of this audit was to review the systems and procedures involved in the administration of the Burial Service. This included examining operational processes to ensure compliance with the Burial Grounds Standards of Service. In addition, a check was made to verify the costs of delivering the service, along with a review of the systems and procedures for income collection. 4.9 The follow-up review found that the majority of recommendations have been implemented; however, there is a need to agree on a revised implementation date to review arrangements for recording lair purchases and interments, with the aim of developing a singular recording system. This has been due to the transfer of responsibility for administering burials from the Registration Service to the Environmental Protection Service, as well as the requirement to assess the implications of recent changes to Burial Regulations. The Follow-Up Report reviewing the implementation of the agreed recommendations is provided in Appendix 2. Emergency Planning 4.10 This follow-up review assessed the implementation of recommendations from an audit of the Council's Emergency Planning arrangements. The Civil Contingencies Act 2004 places a legal obligation on emergency services and local authorities to assess risks, plan for, and conduct exercises related to emergencies such as floods, adverse weather, pandemics, or other incidents that could significantly impact the community. Effective emergency planning is an essential component of the Council’s overall governance arrangements, ensuring the resilience of all key services in the event of a major incident. The follow-up review found that the majority of recommendations have been implemented, although some remain outstanding. The Follow-Up Report reviewing the implementation of the agreed recommendations is provided in Appendix 3. 5. PROPOSALS 5.1 It is recommended that Committee agree to note the progress made by Internal Audit in the period from 24 June 2025 to 10 September 2025. 6. SUMMARY OF IMPLICATIONS 6.1 The table below shows whether risks and implications apply if the recommendations are agreed: Page 17
Page 18
SUBJECT YES NO Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) × Policy and Legal × Financial × Risk × Staffing × Best Value and Transformation × Property × Information Communications Technology/Digital × Equalities. Social Inclusion and Economic Impact × Climate Change, Biodiversity and Sustainability × 6.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP)) Improved Collaborative Leadership, as part of continuous improvement through Best Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. a) Links to Council Corporate Plan – The proposals in this report support and contribute to improved outcomes for communities as outlined in the following Council Plan strategic priorities: ☐ Tackle Poverty and Inequality. ☐ Build Stronger Greener Vibrant Economy. ☐ Build Thriving, resilient, empowered Communities. b) Links to Local Outcomes Improvement Plan – The proposals in this report support and contribute to improved outcomes for communities as outlined in the following local Outcomes Improvement Plan priorities: ☐ Developing a diverse, inclusive, and sustainable economy ☐ Building a better future for our children and young people in Moray. ☐ Empowering and connecting communities. ☐ Improving wellbeing of our population 6.3 Policy and Legal No implications directly arising from this report. 6.4 Financial No implications directly arising from this report. One off Costs: Service Area Budget Budget Years Proposed Spend this Year Virement From Other Comments Annually Recurring Costs: Page 18
Page 19
Service Area Budget With Effect From Annual Net Impact Virement From (if applicable) Other Comments 6.5 Risk The independent review of selected systems and procedures mitigates the risk associated with inadequate or ineffective control procedures. 6.6 Staffing No implications directly arising from this report. 6.7 Best Value and Transformation Internal audit work supports good governance and the delivery of efficient services. 6.8 Property No implications directly arising from this report. 6.9 Information Communications/Technology/Digital No implications directly arising from this report. 6.10 Equalities, Social Inclusion and Economic Impact No implications directly arising from this report. 6.11 Climate Change and Biodiversity Impacts No implications directly arising from this report. 7. CONSULTATION 7.1 There have been no direct consultations during the preparation of this report. 8. BACKGROUND PAPERS 8.1 None Page 19
Page 20
APPENDIX 1 Internal Audit Annual Work Programme- 2025/26 Update Report CORE SYSTEM REVIEWS Auditable Area Type of coverage Status/ Comments Payroll Continuous auditing to confirm the adequacy of the systems and procedures for paying salaries. The intention is to make further use of an auditing software application in the analysis of data and the sample selected for testing. Audit programmed to start in the next quarter(s) Procurement and Creditor Payments Continuous auditing of samples of non-payroll expenditure to test compliance with procurement and payment processing regulations. The intention is to make further use of an auditing software application in the analysis of data and the sample selected for testing. Fieldwork in progress Democracy and Governance Review administrative arrangements established to support effective democracy, governance and committee reporting arrangements. The audit will include reviewing policies and checking a sample of meetings/papers/action logs to ensure adequate and timely information is provided as required and requested to aid informed decision making. Fieldwork in progress Banking and Reconciliation To obtain assurance that adequate procedures are in place, ensuring accurate, timely reconciliations of income received and any differences are addressed promptly. A review of the banking arrangements will also be undertaken. Completed Final Report issued Absence Management An audit will consider the effectiveness of sickness absence monitoring and reporting. This will include the arrangements from within the Council and the Moray Integration Joint Board. Audit review and draft report completed SERVICE REVIEWS Auditable Area Type of coverage Status/ Comments National Non-Domestic Rates To ensure that Business Rates billing and collection arrangements are robust and that reliefs awarded are adequately supported. Audit review and draft report completed Moray Growth Deal Follow Up A follow up review to evidence implementation of the recommendations agreed within the audit undertaken in 2024/25 Audit Plan of the governance and administrative arrangements within the management of the Moray Growth Deal. Audit programmed to start in the next quarter(s) Levelling Up Fund An overview of the governance and administrative arrangements within the Council for the management of the Levelling Up Fund. Fieldwork in progress Capital Plan Audit testing of contract management arrangements for selected project(s) within the capital plan. Audit programmed to start in the next quarter(s) Education – Secondary School Establishment visits as part of cyclical review. Further to the consultation with the service, additional testing will be undertaken in the use of purchasing cards. Audit programmed to start in the next quarter(s) Commercial Harbours A review of commercial harbours regarding the accounting arrangements of income and expenditure. The audit will review operating activity against Council Policies and Procedures. Audit programmed to start in the next quarter(s) Management of School Funds Review the processes in the management and control of School Funds. Audit programmed to start in the next quarter(s) Common Good Funds An audit of the accounting arrangements and procedures in the management of Common Good Funds. Audit programmed to start in this quarter Adult Care Commissioning- Follow up review KPMG review Follow up review to evidence implementation of the recommendations detailed within the KPMG Adult Social Care Commissioning audit. Audit programmed to start in the next quarter(s) Page 20
Page 21
Transportation- Education Review operating arrangements to ensure compliance with the conditions of contracts and compliance with Council Financial Regulations and Procurement Guidelines in managing school transport contracts. Audit programmed to start in the next quarter(s) MORAY INTEGRATION JOINT BOARD Auditable Area Type of coverage Status/ Comments Complex and Challenging Needs Service Review of systems and procedures within Complex and Challenging Needs Service in the management of Woodview and Barlink Social Work Establishments. Completed Final Report issued Non-payroll expenditure A review of non-payroll expenditure to test compliance with Financial Regulations, procurement and payment processing regulations. An auditing software application will be used in the analysis of data and the sample selected for testing. (Further to discussions with the Chief Officer, it has been agreed to change the planned audit regarding support for carers to a review of non-payroll expenditure. This is due to the Service's ongoing implementation of a recent update to the Unpaid Carers Strategy. A review of support for carers will be considered for inclusion within a future Audit Plan). Audit programmed to start in the next quarter(s) Social Care Financial Assessments/ Contributing to your Care An audit to check the processes and accounting arrangements in the charging of care to service users. Audit programmed to start in the next quarter(s) GRAMPIAN VALUATION JOINT BOARD Auditable Area Type of coverage Status/ Comments Grampian Valuation Joint Board In accordance with the Public Sector Internal Audit Standards applicable to local government and joint boards, an annual review is required of Grampian Valuation Joint Board activities. Completed VERIFICATION ACTIVITY Auditable Area Type of coverage Status/ Comments Year End Stock Valuations Verification of Year End Stock Verification for Building Services/ Environmental Services/ Community Services Stores. Completed Year end stock valuations agreed Network Support Grant Ongoing certification requirements for the Network Support Grant to Transport Scotland. Ongoing Half yearly audit certification requirement. Last Network Support Grant certified to 31/03/2025. COUNTER FRAUD ACTIVITY Auditable Area Type of coverage Status/ Comments Counter Fraud Review Annual review of the Council's counter fraud framework to minimise the risk and impacts of fraud from internal and external threats. The scope of the audit and testing undertaken will be informed by frauds reported within other organisations. Fieldwork in progress National Fraud Initiative The National Fraud Initiative (NFI) is a data- matching project conducted by the Cabinet Office on behalf of Audit Scotland every two years. It involves a data-matching exercise using information from various Council systems, as well as data provided by other councils and organisations. Ongoing The 2024/25 NFI exercise has begun, and the agreed approach is for services to review and document the reasons for data matches, while the Internal Audit Section investigates potential fraud, monitors progress, and reports on the outcome. Page 21
Page 22
FOLLOW-UP REVIEWS DUE TO EVIDENCE IMPLEMENTATION OF OUTSTANDING RECOMMENDATIONS FROM PREVIOUSLY ISSUED AUDIT PROJECTS – 2025/26* * Additional follow-up reviews may be added depending on the implementation dates for recommendations detailed by services Audit Undertaken Scope of Audit Review Self Directed Support (SDS) – Option 2/3 The scope of the audit was to review systems and procedures in the delivery and management of adult social care provided under Options 2 and 3 of the SDS scheme. This included examination of the processes to support individuals in determining their preferred care delivery option, contractual relationships with care providers, financial management and monitoring of individual care packages. Emergency Planning The objective of this audit was to provide assurance over the adequacy and effectiveness of current controls over emergency planning. The audit scope included a check to ensure adequate training, planning and testing has been developed in the event of an emergency. Pool Cars Scheme The scope of this audit was to review systems and procedures in the management and use of pool cars. Policies and procedures were checked to ensure they provide appropriate operating guidance to officers in the booking and use of pool cars. The audit included a review of arrangements for internal recharging to services and also exploration if further use of pool cars could provide additional value for money opportunities to the Council. Moray Integrated Community Stores The audit reviewed the management of the Moray Integrated Community Stores. This included reviewing the procedures for ordering and issuing occupational therapy equipment to service users. In addition, a check was made to compare stock records to the actual equipment held within the Stores. Keith Sports & Community Centre The audit scope reviewed the processes and procedures in place at the Keith Sports and Community Centre and evaluate the effectiveness of internal controls relating to income and expenditure. This involved the sample testing of individual transactions to ensure compliance with Regulations and Guidelines. In addition, an appraisal of working practices was also undertaken to assess if the Service was maximising the income due to the Council. Special Investigation – St. Giles Shopping Centre – Non-Domestic Rates The Interim Chief Executive requested an internal audit to review the collection arrangements of non-domestic rates for the St Giles Shopping Centre, Elgin, over the last 2 years. This also required an overview of the Council’s systems and procedures in the management of the billing and collection arrangements for non-domestic rates. Special Investigation – Windows Replacement Programme The audit scope was to check the contract for manufacturing replacement windows for properties at Carnie Place. This involved discussions with officers, review of documentation, emails, and minutes of meetings in the administration of this contract. The audit also undertook a physical inspection with the support of an officer in Property Services to confirm the stock of windows stored by Building Services. Children's Services Care Commissioning The audit scope was to review and assess the commissioning of social care services for children. Services delivered included contracts for preventative, support and restorative services, residential care, and out of area residential placements required due to the limited provision of specialised care and capacity within Moray. Food Standards Scotland Guidelines The audit reviewed systems and procedures used by the Council's Environmental Health Service to evidence compliance with the Food Law Code of Practice (Scotland) developed by Food Standards Scotland. Following the Public Pound The Internal Audit Plan provided for a “Following the Public Pound” review to ensure proper accountability for public funds used in delivering services, irrespective of the means of service delivery. Councils fund Arms Length External Organisations (ALEOs) to provide important services to the public. These funding arrangements are often more complex than purchase contracts for goods or services but can bring both financial and operational benefits to councils. Procurement and Creditor Payments A review of payments made to suppliers of goods and services was undertaken. The purpose of the audit was to confirm compliance with Financial, Authorisation, Procurement and Creditor Payment Processing Regulations from the sample checked. The review formed part of the annual continuous auditing activity of non-salary expenditure and is used to support the Service Manager Internal Audit and Risk’s annual opinion of the Council’s internal control systems. Commercial Refuse Collection The Internal Audit Plan provided for a review to be undertaken of the controls in the management of the Commercial Refuse Collection Service. The audit checked to ensure robust accounting arrangements are followed, and appropriate agreements are in place with customers. Housing Rent Collection & Arrears Management The audit scope was to review the key operational controls regarding rent collection and arrears management of current and former tenant rents. The aim of the audit was to look at the controls and processes existing over the administration of rent accounts, accounting fully and promptly for monies collected. Keith Grammar School The scope of this audit was to review the operation of the Devolved School Management Scheme in terms of funding allocation and management at the school level. Consideration was given to how budgets are affected by National, Council and School priorities. Banking and Reconciliation A review was undertaken to obtain assurance that an effective and systematic methodology is in place to ensure accurate and timely reconciliations are undertaken of the Council's main bank accounts for the receipt of income. This involved a review of the operating procedures, verification and testing of the reconciliations undertaken and the administration of suspense transactions where income has not been immediately identifiable on receipt. Page 22
Page 23
APPENDIX 2 Moray Council Internal Audit Section DEPARTMENT: Economy, Environmental & Finance SUBJECT: Burial Services REPORT REF: 24'007 Follow Up Audit Review Risk Ratings for Recommendations High Key controls absent, not being operated as designed or could be improved. Urgent attention required. Medium Less critically important controls absent, not being operated as designed or could be improved. Low Lower level controls absent, not being operated as designed or could be improved. No. Audit Recommendation Priority Accepted (Yes/ No) Date of Completion Status / Explanation Key Control: Key costs of service provision are appropriately controlled and accounted for. 5.1 The Schedule of Rates should be reviewed to ensure full and current costs of service provision are reflected and recharged to the Burials Service. Medium Yes 31/03/2024 Implemented. A new full cost recovery model has been introduced for the Burials Service, effective from 2024/25. A new budget construct within the Financial Management System has been established to enable the full costs of delivering the Burials Service to be directly allocated to a single cost centre. 5.2 Consideration should be given to the development of recharge rates for interments within the Schedule of Rates which reflect the varying costs of service provision incurred by weekday and weekend interments. Low Yes 31/12/2023 Implemented. The new full cost recovery model, referred to in section 5.1, means that all operating costs are allocated directly to a single cost centre for the Burials Service. This allows for improved budget monitoring and cost identification and facilitates accurate accounting of labour costs for work undertaken over the weekend. 5.3 Checks should be undertaken to ensure all jobs carried out in the month are identified for recharge in the Confirm system and the Confirm content is reflected accurately in the recharge processed in the Financial Management System. Low Yes 30/09/2023 Implemented. The new costing model has eliminated the need for monthly recharges of interment and headstone work from Grounds Maintenance Operations to the Burials Service, as the cost of these activities is now charged directly to the single cost centre for the Burials Service. Key Control: Processes are in place to control all income due to the service with fees formally approved and regularly reviewed and income amounts fully and appropriately accounted for. 5.4 A review of current arrangements for the recording of lair purchases and interments should be undertaken with the aim of developing a singular recording system. Medium Yes 31/03/2025 (Revised Implementation Date 31/12/2026) Outstanding. The follow-up review found that this recommendation had not been implemented. However, the audit acknowledges the need for a revised implementation date, as significant service delivery and legislative changes have occurred. It was found that, as of 1 April 2025, the administration function for burials has moved from the Registration Service to the Environmental Protection Service. This will require a review of systems and practices that were significantly paper based, with a view to introducing improved administrative arrangements. In addition, the implications of the recent Burial Regulations, published by the Scottish Government in February 2025, will need to be considered to ensure that any proposed singular recording system software application meets future reporting and management requirements. It was noted that an update regarding these Regulations was reported to the ED&I Committee on 29 April 2025 (item 12 of minute refers). The Service is actively reviewing the changes needed to the burials' administrative arrangements, with Page 23
Page 24
Risk Ratings for Recommendations High Key controls absent, not being operated as designed or could be improved. Urgent attention required. Medium Less critically important controls absent, not being operated as designed or could be improved. Low Lower level controls absent, not being operated as designed or could be improved. No. Audit Recommendation Priority Accepted (Yes/ No) Date of Completion Status / Explanation progress monitored through the Environmental & Commercial Services Service Plan. Due to the substantial changes in service delivery and new legislative requirements, a revised implementation date of 31 December 2026 has been agreed. Page 24
Page 25
APPENDIX 3 Moray Council Internal Audit Section DEPARTMENT: Economy, Environmental & Finance SUBJECT: Emergency Planning REPORT REF: 23’021 Follow Up Audit Review Risk Ratings for Recommendations High Key controls absent, not being operated as designed or could be improved. Urgent attention required. Medium Less critically important controls absent, not being operated as designed or could be improved. Low Lower level controls absent, not being operated as designed or could be improved. No. Audit Recommendation Priority Accepted (Yes/ No) Date of Completion Status / Explanation 5.1 The Emergency Planning Policy and Procedures should be updated to reflect current operating arrangements and staffing structures. Medium Yes 31/05/2023 (Revised Implementation Date 30/11/2025) Part Implemented – An updated Emergency Planning Policy & Procedures has been prepared in draft, which is now referenced as a General Emergency Plan. The Plan needs to be reviewed by the Corporate Leadership Team before seeking approval from Committee. A revised implementation date of 30/11/2025 has been agreed. 5.2 Regular meetings should be held between the Emergency Planning Officer and the Business Continuity and Risk Management Officer to ensure ongoing alignment of emergency and business continuity plans. Medium Yes Implemented Implemented– The follow up review has confirmed that regular meetings are held between the Emergency Planning Officer and the Business Continuity and Risk Management Officer. 5.3 Emergency plans should be updated to reflect current risks, working practices and staffing structures of the Council and partner organisations. After updating the emergency plans, testing should be undertaken to evidence their effectiveness and highlight any areas for further improvement. Medium Medium Yes Yes 31/12/2024 (Revised Implementation Date 30/09/2025) Implemented Part Implemented – A review of emergency plans for services noted that all have been updated, except the Health and Social Care Moray - Care for People Plan. This plan still requires further review by senior management before it is finalised. The Service has provided a revised implementation date of 30/09/2025. It was noted that the Emergency Planning Officer is undertaking ongoing testing to evaluate the effectiveness of the emergency plans and identify areas where further improvements are required. 5.4 Further training and documented guidance should be provided to Moray Emergency Response Co- Ordinators (MERC) to support officers in best practices to follow in the event of an emergency incident. Medium Yes 31/12/2023 Implemented– It was noted that further training has been provided to Moray Emergency Response Co-Ordinators (MERC) by the Emergency Planning Officer. In addition, guidance has been developed for officers to assist in the event of an emergency and is available to officers through the MERC Portal within SharePoint. 5.5 Emergency contact details of the Moray Emergency Response Co- Ordinators (MERC) saved within Sharepoint should be restricted to only officers that require access to this information. Medium Yes 31/07/2023 Implemented- Access privileges to the emergency contact details of Moray Emergency Response Co-Ordinators (MERC) held within SharePoint are now restricted to only authorised officers. 5.6 An Annual Report should be provided to elected members detailing the work undertaken and planned within emergency planning. Medium Yes 31/03/2024 (Revised Implementation Date 30/11/2025) Outstanding – Discussions with officers noted that an annual report detailing the work undertaken and planned within the Emergency Planning Service is intended and will thereafter be reported to committee. The Service has provided a revised implementation date of 30/11/2025. Page 25
Page 26
Risk Ratings for Recommendations High Key controls absent, not being operated as designed or could be improved. Urgent attention required. Medium Less critically important controls absent, not being operated as designed or could be improved. Low Lower level controls absent, not being operated as designed or could be improved. No. Audit Recommendation Priority Accepted (Yes/ No) Date of Completion Status / Explanation 5.7 A review of the hyperlinks contained within emergency planning webpages should be undertaken to ensure they connect to the intended document or website. Medium Yes 31/08/2023 Implemented – The Emergency Planning Service webpage within the Moray Council website has been updated and also includes the correct web links to partner agency websites and key documents. Page 26
Page 27
Report to: Audit and Scrutiny Committee Meeting Date: 10 September 2025 Report by: Service Manager Internal Audit and Risk Report No: GSP045/25/DL Author: Dafydd Lewis Contact Email: dafydd.lewis@moray.gov.uk Subject: Internal Audit Review – Banking and Reconciliation 1. PURPOSE ☒ For Decision ☐ For Information 1.1 The report advises Committee on an internal audit review completed for the period from 24 June 2025 to 10 September 2025. 1.2 This report is submitted to Committee in terms of Section III (I) (2) and (8) of the Council’s Scheme of Administration relating to consideration of reports from the Council’s Internal Auditor and monitoring delivery of the audit service through receipt of quarterly reports on work carried out by Internal Audit. 2. SUMMARY 2.1 This report provides details of the internal audit review of Banking and Reconciliation; this project has been agreed for review within the Internal Audit Plan for 2025/26. 3. RECOMMENDATIONS 3.1 It is recommended that Committee considers the contents of this report, seeks clarification on any points noted, and endorses the recommendations contained within the report. Dafydd Lewis Service Manager Internal Audit and Risk 4. BACKGROUND AND CONTEXT 4.1 An audit has been undertaken into the Council’s banking and reconciliation arrangements. Each year, the Council receives significant funds through its bank accounts. The Council operates three main bank accounts to manage incoming funds, all of which were reviewed as part of this audit. The audit objective was to ensure that effective and systematic processes are in place for the timely and accurate reconciliation of these accounts. This Item 7. Page 27
Page 28
involved a review of operating procedures, verification and testing of completed reconciliations and an assessment of how suspense transactions are administered when income cannot be immediately identified. Overall, the audit found that the Council has effective banking and reconciliation arrangements in place. However, some administrative improvements were identified. The findings and recommendations are detailed in the audit report in Appendix 1. 5. PROPOSALS 5.1 This report provides Committee with a summary of findings arising from an audit project completed during the review period. 6. SUMMARY OF IMPLICATIONS 6.1 The table below shows whether risks and implications apply if the recommendations are agreed: SUBJECT YES NO Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) × Policy and Legal × Financial × Risk × Staffing × Best Value and Transformation × Property × Information Communications Technology/Digital × Equalities. Social Inclusion and Economic Impact × Climate Change, Biodiversity and Sustainability × 6.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP)) Improved Collaborative Leadership, as part of continuous improvement through Best Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. a) Links to Council Corporate Plan – The proposals in this report support and contribute to improved outcomes for communities as outlined in the following Council Plan strategic priorities: ☐ Tackle Poverty and Inequality. ☐ Build Stronger Greener Vibrant Economy. ☐ Build Thriving, resilient, empowered Communities. b) Links to Local Outcomes Improvement Plan – The proposals in this report support and contribute to improved outcomes for communities as outlined in the following local Outcomes Improvement Plan priorities: ☐ Developing a diverse, inclusive, and sustainable economy ☐ Building a better future for our children and young people in Moray. ☐ Empowering and connecting communities. ☐ Improving wellbeing of our population 6.3 Policy and Legal No implications directly arising from this report. Page 28
Page 29
6.4 Financial No implications directly arising from this report. One off Costs: Service Area Budget Budget Years Proposed Spend this Year Virement From Other Comments Annually Recurring Costs: Service Area Budget With Effect From Annual Net Impact Virement From (if applicable) Other Comments 6.5 Risk The independent review of selected systems and procedures mitigates the risks associated with inadequate or ineffective control procedures. 6.6 Staffing No implications directly arising from this report. 6.7 Best Value and Transformation Internal audit work supports good governance and the delivery of efficient services. 6.8 Property No implications directly arising from this report. 6.9 Information Communications/Technology/Digital No implications directly arising from this report. 6.10 Equalities, Social Inclusion and Economic Impact No implications directly arising from this report. 6.11 Climate Change and Biodiversity Impacts No implications directly arising from this report. 7. CONSULTATION 7.1 There have been no direct consultations during the preparation of this report. 8. BACKGROUND PAPERS 8.1 None Page 29
Page 30
APPENDIX 1 1 Final Internal Audit Report Banking and Reconciliation July 2025 Distribution: Head of Financial Services Finance Manager Assistant Manager – FMS & Banking The Internal Audit Section provides Management with an opinion on the internal control environment and also categories risk ratings for recommendations as high, medium or low (detailed explanation provided in Appendix1). The audit recommendations for this review have been classified as follows Assurance Level Risk Ratings for Recommendations Full Priority 1 0 Priority 2 0 Priority 3 2 Confidentiality and Disclosure Clause This report (“Report”) was prepared by the Internal Audit Section of Moray Council. The matters raised in this Report are only those which came to our attention during our internal audit work. Whilst every care has been taken to ensure that the information provided in this Report is as accurate as possible, the Moray Council Internal Audit Section has only been able to base findings on the information and documentation provided and consequently, no complete guarantee can be given that this Report is necessarily a comprehensive statement of all the weaknesses that exist, or of all the improvements that may be required. This Report was prepared solely for the use and benefit of the Moray Council, Moray Integration Joint Board or the Grampian Valuation Joint Board. Moray Council's Internal Audit Section accepts no responsibility and disclaims all liability to any third party who purports to use or rely for any reason whatsoever on the Report, its contents, conclusions, any extract, reinterpretation, amendment and/or modification. Accordingly, any reliance placed on the Report, its contents, conclusions, any extract, reinterpretation, amendment and/or modification by any third party is entirely at their own risk. Please refer to the Statement of Responsibility in Appendix 2 of this report for further information about responsibilities, limitations and confidentiality. Page 30
Page 31
2 Contents Page Banking and Reconciliation 1. Introduction & Scope 3 2. Key Issues 3-4 Detailed Report 3. Findings/Recommendations 5-8 4. Management Response 6-9 Appendices 1. Audit Terms of Reference and Definitions 2. Statement of Responsibility Page 31
Page 32
3 1. Introduction and Audit Scope The 2025/2026 annual audit plan provides for a review to be undertaken of the Council's banking and reconciliation arrangements. Bank reconciliation is the process of matching the balances in an organisation's accounting records to the corresponding information on a bank statement. The aim of a bank reconciliation process is to ascertain the differences between the two and make appropriate adjustments to the accounting records to ensure accurate reflection of transactions and balances. The audit scope was to obtain assurance that an effective and systematic methodology is in place to ensure accurate and timely reconciliations are undertaken of the Council's main bank accounts for the receipt of income. This involved a review of the operating procedures, verification and testing of the reconciliations undertaken and the administration of suspense transactions where income has not been immediately identifiable on receipt. The audit has also involved undertaking a review of the Council's banking arrangements. The Council operates three main bank accounts for administering income received and these have been reviewed during the course of the audit. Focus has also been given to the processes for Funds In Transit collections to ensure that all monies received are identified and remain accounted for at all stages between collection and lodgement into the Council's bank accounts. The Council collects a significant and diverse range of income categories, such as Council Tax and Non-Domestic Rates, Housing Rents, Planning Fees, charges for Waste Services, and also encompasses funding of the Council through grant receipts and revenue support. The audit has involved interrogation of the Council's Financial Management System used for accounting and bank reconciliation purposes and the Capita Income Management System used to provide logs and breakdowns of income received by services. The audit was carried out in accordance with Public Sector Internal Audit Standards (PSIAS). 2. Key Issues • The audit confirmed that monthly bank reconciliation exercises are undertaken for all Council bank accounts. However, it was noted that the certification by management of these monthly reconciliations is not retained beyond 28 days within the SharePoint Workflow System. The certification by management of the monthly bank reconciliation exercises should be retained to ensure evidence of an audit trail is Page 32
Page 33
4 maintained of the scrutiny for a core financial control. • Overall, the audit found that within the scope of the review, effective banking and reconciliation arrangements were in place for all income received. It should be noted that significant funds are collected annually through the Council's bank accounts, e.g., in 2024/25, approximately £225 million in Government funding, £196 million in services fees and charges and £51 million in Council Tax. However, at the time of the audit, 18 entries, totalling £40,900 of income, were found to have remained unallocated to accounting codes within the Financial Management System for over one month, the oldest transaction being 2 months old. To ensure accounting records are accurate and reflect current transactions, income received should be allocated to the appropriate financial code at the earliest opportunity. Page 33
Page 34
5 Findings/Recommendations - Banking and Reconciliation 2025/26 Ref Risk Ratings for Recommendations Audit Finding Audit Recommendation 1 Low When income is received, a unique reference is required to identify the source and post it to the correct customer account, and/or accounting code within the Financial Management System's general ledger. However, instances occur where income received into the Council's bank accounts either does not have any source reference, the reference quoted is invalid, or the income represents a miscellaneous receipt, such as a payment received that is not associated with a particular invoice. In these circumstances, an unreconciled item is created within the bank reconciliation process, as the amount will be reflected in the Council's bank account as received but cannot be correspondingly recorded within the Council's financial accounts until a manual identification is made, which allows posting to the correct customer account and / or accounting code. Additionally, identifying breakdowns should be provided by services for Funds In Transit which are accounted for at point of collection, before lodgement into the Council's bank account. The Unallocated income must be identified in a timely manner to allow accurate financial recording within the Council's general ledger. Services should be reminded of the need to provide income detail on a prompt basis. Any receipts not able to be identified within a reasonable timescale should be returned to the bank to progress to a conclusion. Page 34
Page 35
6 non-provision of this information also creates an unreconciled item which cannot be recorded within the Council's financial accounts. Overall, from the audit testing undertaken of the bank account reconciliation processes, effective management arrangements were found, where significant funds are identified and reviewed promptly to ensure that monies received are accounted for and allocated correctly to the appropriate accounting code within FMS. However, at the time of the audit, 18 entries, totalling £40,900 of income, were found to have remained unallocated within the FMS for over one month, the oldest transaction being 2 months old. For accurate and timely recording of income in the Council's accounting records, it is important that the source of the monies received is identified at the earliest opportunity. Management Response Responsible Officer Accepted (Yes/ No) Timescale for Implementation (Date Required) Agreed Management Action/Management Comment Assistant Manager – FMS & Banking Yes 31/08/2025 All income will be allocated within 1 month of receipt which will allow ample time for identification. Any income remaining Page 35
Page 36
7 unidentified after 1 month will be returned to the originating source by the Council's Bank. Page 36
Page 37
8 Ref Risk Ratings for Recommendations Audit Finding Audit Recommendation 2 Low The Council operates three main bank accounts for the administration of income received and these have been reviewed as part of this audit. On a daily basis, reconciling tasks are being undertaken by the Banking Team within the bank reconciliation module of FMS to ensure funds received are appropriately allocated and accounted for. Every month, a full formal reconciliation of each bank account is undertaken and is checked and approved by the Assistant Manager - FMS & Banking, within the SharePoint Workflow system. Audit testing noted that the evidence of authorisation within the SharePoint Workflow system is deleted after 28 days. An improvement to the process is required to ensure that evidence of all bank reconciliation checking and approval by service management is retained for reference purposes. Monthly bank account reconciliations should be signed and dated to retain evidence of the checks and approval undertaken by management of a core financial control. Page 37
Page 38
9 Management Response Responsible Officer Accepted (Yes/ No) Timescale for Implementation (Date Required) Agreed Management Action/Management Comment Assistant Manager – FMS & Banking Yes 31/08/2025 All bank reconciliations will continue to go through the SharePoint Workflow system. In addition, the approving manager will add their signature and date to the file to preserve the evidence of authorisation when the file moves to the SharePoint records site. Page 38
Page 39
10 Appendix 1 AUDIT TERMS OF REFERENCE AND DEFINITIONS 1. Audit Objectives 1.1 The overall audit objective is to provide an objective independent opinion on the adequacy and effectiveness of controls / processes. 1.2 The audit will for each controls / process being considered: • Walkthrough the processes to consider the key controls; • Conduct sample testing of the identified key controls, and • Report on these accordingly 1.3 All audit reviews are carried out in accordance with Public Sector Internal Audit Standards (PSIAS). 2. Definitions for Auditing Opinions and Findings 2.1 In order to assist management in using our reports: The Internal Auditor will categorise audit assurance opinion according to their overall assessment of the risk management system, effectiveness of the controls in place and the level of compliance with these controls and the action being taken to remedy significant findings or weaknesses. Assurance Level System and Testing Conclusion Full The controls tested are being consistently applied Substantial There is evidence that the level of non compliance with some of the controls may put some of the system objectives at risk. Limited The level of non compliance puts the system objectives at risk. None Significant non-compliance with basic controls leaves the system open to error or abuse. 2.2 Risk ratings for each recommendation is based on the following criteria: High Fundamental control weaknesses that require immediate attention by management to action and mitigate significant exposure to risk Medium Less critically important controls absent, not being operated as designed or could be improved Low Lower level controls absent, not being operated as designed or could be improved. Page 39
Page 40
11 Appendix 2 STATEMENT OF RESPONSIBILITY The responsibility for designing and maintaining a sound system of internal control to prevent and detect fraud and other irregularities rests with management, with internal audit providing a service to management to support them to achieve this objective. The Internal Audit Section will assess the adequacy and effectiveness of the system of internal control arrangements implemented by management and perform sample testing on those controls in the period under review with a view to providing an opinion on the extent to which risks in this area are managed. The Internal Audit Section will undertake testing with the objective of detecting significant control weaknesses. However, the audit approach alone should not be relied upon to identify all strengths and weaknesses in internal controls nor to find any fraud or irregularity. Even sound systems of internal control can only provide reasonable and not absolute assurance and may not be proof against collusive fraud. The matters raised in this report are only those that came to our attention during the course of the audit review and are not necessarily a comprehensive statement of all the weaknesses that exist or all improvements that might be made. Recommendations for improvements should be assessed by management for their full impact before they are implemented. The performance of the audit review undertaken should not be taken as a substitute for management’s responsibilities for the application of sound management practices. This report must not be disclosed to any third party or reproduced in whole or in part without the written consent of the Moray Council’s Audit and Risk Manager. Page 40
Page 41
Report to: Audit and Scrutiny Committee Meeting Date: 10 September 2025 Report by: Service Manager Internal Audit and Risk Report No: GSP046/25/DL Author: Dafydd Lewis Contact Email: dafydd.lewis@moray.gov.uk Subject: Internal Audit Review – Residential Care 1. PURPOSE ☒ For Decision ☐ For Information 1.1 The report advises Committee on an internal audit review completed for the period from 24 June 2025 to 10 September 2025. 1.2 This report is submitted to Committee in terms of Section III (I) (2) and (8) of the Council’s Scheme of Administration relating to consideration of reports from the Council’s Internal Auditor and monitoring delivery of the audit service through receipt of quarterly reports on work carried out by Internal Audit. 2. SUMMARY 2.1 This report provides details of the internal audit review of Residential Care; this project has been agreed for review within the Internal Audit Plan for 2024/ 25. 3. RECOMMENDATIONS 3.1 It is recommended that Committee considers the contents of this report, seeks clarification on any points noted, and endorses the recommendations contained within the report. Dafydd Lewis Service Manager Internal Audit and Risk 4. BACKGROUND AND CONTEXT 4.1 An audit review of residential care was undertaken. The scope of the audit was to examine the processes for making accurate payments at agreed contract rates to third-party providers for the delivery of permanent residential care for older persons. Testing included Item 8. Page 41
Page 42
verifying that all residents entering a residential care home following a care needs assessment had been financially assessed in accordance with Scottish Government Guidance. A check was also carried out to verify the accuracy of the calculation of assessed contributions toward care costs, as well as the administrative arrangements for processing and paying third-party care providers. 4.2 The audit found that processes and information storage systems within the Community Care Finance Service to administer payments to residential care homes are significantly paper-based. The Service should explore opportunities to digitise its current operating arrangements, which could lead to improved efficiency and stronger administrative controls. The audit also identified significant delays in both requesting the necessary financial assessment information and processing it once received from individuals who have entered a care home. These delays affect cash flow and accounting processes, as payments already made need to be recovered from future payments to care homes. The findings and recommendations are detailed in the audit report in Appendix 1. 5. PROPOSALS 5.1 This report provides Committee with a summary of findings arising from an audit project completed during the review period. 6. SUMMARY OF IMPLICATIONS 6.1 The table below shows whether risks and implications apply if the recommendations are agreed: SUBJECT YES NO Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) × Policy and Legal × Financial × Risk × Staffing × Best Value and Transformation × Property × Information Communications Technology/Digital × Equalities. Social Inclusion and Economic Impact × Climate Change, Biodiversity and Sustainability × 6.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP)) Improved Collaborative Leadership, as part of continuous improvement through Best Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. a) Links to Council Corporate Plan – The proposals in this report support and contribute to improved outcomes for communities as outlined in the following Council Plan strategic priorities: ☐ Tackle Poverty and Inequality. ☐ Build Stronger Greener Vibrant Economy. ☐ Build Thriving, resilient, empowered Communities. Page 42
Page 43
b) Links to Local Outcomes Improvement Plan – The proposals in this report support and contribute to improved outcomes for communities as outlined in the following local Outcomes Improvement Plan priorities: ☐ Developing a diverse, inclusive, and sustainable economy ☐ Building a better future for our children and young people in Moray. ☐ Empowering and connecting communities. ☐ Improving wellbeing of our population 6.3 Policy and Legal No implications directly arising from this report. 6.4 Financial No implications directly arising from this report. One off Costs: Service Area Budget Budget Years Proposed Spend this Year Virement From Other Comments Annually Recurring Costs: Service Area Budget With Effect From Annual Net Impact Virement From (if applicable) Other Comments 6.5 Risk The independent review of selected systems and procedures mitigates the risks associated with inadequate or ineffective control procedures. 6.6 Staffing No implications directly arising from this report. 6.7 Best Value and Transformation Internal audit work supports good governance and the delivery of efficient services. 6.8 Property No implications directly arising from this report. 6.9 Information Communications/Technology/Digital No implications directly arising from this report. 6.10 Equalities, Social Inclusion and Economic Impact No implications directly arising from this report. 6.11 Climate Change and Biodiversity Impacts No implications directly arising from this report. Page 43
Page 44
7. CONSULTATION 7.1 There have been no direct consultations during the preparation of this report. 8. BACKGROUND PAPERS 8.1 None Page 44
Page 45
APPENDIX 1 1 Final Internal Audit Report Residential Care August 2025 Distribution: Chief Financial Officer (Moray IJB & Dr Grays) Head of Service Interim Finance Manager The Internal Audit Section provides Management with an opinion on the internal control environment and also categories risk ratings for recommendations as high, medium or low (detailed explanation provided in Appendix1). The audit recommendations for this review have been classified as follows Assurance Level Risk Ratings for Recommendations Substantial Priority 1 0 Priority 2 4 Priority 3 3 Confidentiality and Disclosure Clause This report (“Report”) was prepared by the Internal Audit Section of Moray Council. The matters raised in this Report are only those which came to our attention during our internal audit work. Whilst every care has been taken to ensure that the information provided in this Report is as accurate as possible, the Moray Council Internal Audit Section has only been able to base findings on the information and documentation provided and consequently, no complete guarantee can be given that this Report is necessarily a comprehensive statement of all the weaknesses that exist, or of all the improvements that may be required. This Report was prepared solely for the use and benefit of the Moray Council, Moray Integration Joint Board or the Grampian Valuation Joint Board. Moray Council's Internal Audit Section accepts no responsibility and disclaims all liability to any third party who purports to use or rely for any reason whatsoever on the Report, its contents, conclusions, any extract, reinterpretation, amendment and/or modification. Accordingly, any reliance placed on the Report, its contents, conclusions, any extract, reinterpretation, amendment and/or modification by any third party is entirely at their own risk. Please refer to the Statement of Responsibility in Appendix 2 of this report for further information about responsibilities, limitations and confidentiality. Page 45
Page 46
2 Contents Page Residential Care 1. Introduction & Scope 3-4 2. Key Issues 4 Detailed Report 3. Findings/Recommendations 5-18 4. Management Response 6-19 Appendices 1. Audit Terms of Reference and Definitions 2. Statement of Responsibility Page 46
Page 47
3 1. Introduction and Audit Scope The 2024/25 annual audit plan includes a review of the procedures and administrative arrangements involving third-party suppliers appointed to provide residential care home services. Last year's gross expenditure budget for permanent residential care for older persons was £12.6 million. Monitoring actual expenditure against this budget is undertaken and reported regularly to the Moray Integration Joint Board. At the time of this audit review, an overspend of £1.8 million was noted for 2024/25. The Service has indicated this is due to an increased number of individuals requiring nursing care, which is charged at a higher rate than residential care. A care needs assessment from Health and Social Care Services is required before an individual enters a care home. This assessment determines the type and level of care an individual requires, ensuring the home can provide the necessary support. A financial assessment is then undertaken to evaluate an individual's income, savings and capital to determine how much they can afford to contribute towards their care. The review noted that at the time of the audit, there were 470 supported individuals in permanent residential care. However, these numbers can vary throughout the year. Funding arrangements are in place with 52 individual care home, 14 of which are located within Moray and provide care to 91% of all residents. The National Care Home Contract (NCHC) sets the standard rates for residential and nursing care payable for publicly funded placements in Scotland. For 2024/2025, the standard rate for residential care is £825.94 per week. The standard rate for nursing care is £957.57 per week, which includes the additional costs associated with nursing services, ensuring that residents receive the necessary medical care and support. The amount payable by an individual entering a care home is determined through a financial assessment and a means- tested calculation, which will result in a contribution towards the cost of their care. However, if an individual has capital exceeding £35,000, they are considered a self-funding resident. In such cases, the contract for their care is arranged directly between the individual and the care home. The audit scope was to review the processes for making accurate payments to third-party providers for permanent residential care delivery at agreed contract rates. The audit also involved testing to ensure that all eligible residents are financially assessed in accordance with the Charging for Residential Accommodation Guidance (CRAG) issued by Scottish Government and that assessed contributions towards care costs are appropriately applied. The audit focused on permanent residential care for older persons in the care sector. An audit of social care financial assessments for other care sector groups, non-residential services and temporary residential care has been included as a separate audit project within the 2025/26 Internal Audit Plan. Page 47
Page 48
4 The audit was carried out in accordance with Public Sector Internal Audit Standards (PSIAS). 2. Key Issues • The audit found that the systems used by the Community Care Finance Service to administer the residential care home service are significantly paper-based. Concerns were noted during the review regarding the storage arrangements of resident files, which were further exacerbated by home working arrangements. Consideration should be given to exploring opportunities for digitising processes to improve administrative efficiency and data protection management. • A care needs assessment is required before an individual enters a care home. When a care home is considered the most appropriate care option, a financial assessment is then required to determine how much the individual should contribute towards the cost of their care. Audit testing identified significant delays both in requesting the necessary financial assessment information from individuals and in processing the information once received. However, no concerns were noted regarding the accuracy of the financial assessments undertaken. • When a new resident enters a care home, standard residential or nursing care rates are paid for publicly funded placements. These rates apply until the resident's income, savings and capital are assessed to determine their financial contribution towards the cost of their care. However, it was noted that there is no early identification of individuals who may be "self-funders", A self-funder is someone who pays the full cost of their care, as they declare that their income, savings or assets typically exceed the financial threshold and a financial assessment is not required to be undertaken by Community Care Finance. In such cases, the amounts overpaid are recovered from the care homes. Early identification of self-funders would eliminate this requirement and improve cash flow and the financial accounting processes. Page 48
Page 49
5 Findings/Recommendations - Residential Care 2024/25 Ref Risk Ratings for Recommendations Audit Finding Audit Recommendation 1 Low Contributions required from individuals towards the cost of their residential care are based on the Charging for Residential Accommodation Guidance (CRAG), issued annually by the Scottish Government. This guidance ensures a nationally consistent approach to the charging criteria for residents in residential care homes. However, the audit review found that the information regarding the financial process for contributing to the cost of residential care, as detailed on the Council's website, is dated 2011 and is not the most current version of information available within the Service. It is understood that Service is developing guidance content which will need to be reflected on both the Moray Council and Health and Social Care Moray websites. Information made available online about residential care and contribution implications should be reviewed and updated to ensure clear guidance is available to members of the public. Page 49
Page 50
6 Management Response Responsible Officer Accepted (Yes/ No) Timescale for Implementation (Date Required) Agreed Management Action/Management Comment Interim Finance Manager Yes 30/09/2025 Moray Council and Health and Social Care Moray websites will be updated to reflect CRAG content on an annual basis. Page 50
Page 51
7 Ref Risk Ratings for Recommendations Audit Finding Audit Recommendation 2 Medium A standardised financial assessment form is used to record the information required under Charging for Residential Accommodation Guidance (CRAG) to calculate the contribution a resident must make toward the cost of their residential care. At the time of the audit, the Service was in the process of revising this form. It was noted that the current financial assessment form, along with the supporting information provided in communications with the resident or their representative, is not digitised. The process remains manually intensive in terms of information handling. A modernised approach to engagement is required, offering the potential for administrative savings and improved ease of use for stakeholders. Consideration should be taken to modernise and improve the financial assessment process by digitising the request and submission of assessment information. Page 51
Page 52
8 Management Response Responsible Officer Accepted (Yes/ No) Timescale for Implementation (Date Required) Agreed Management Action/Management Comment Interim Finance Manager Yes 31/03/2027 The current Financial Assessment Form has been reviewed and updated to facilitate the easier capture and processing of information. However, the digitisation of the process is linked to the implementation of the replacement of the CareFirst system. Page 52
Page 53
9 Ref Risk Ratings for Recommendations Audit Finding Audit Recommendation 3 Medium As noted in Finding 2, financial assessments and their associated supporting information are not currently available in electronic format. As part of the audit review, access to residents' files was required to test and verify the accuracy of the financial assessments undertaken. However, it was found that there is no organised filing system for identifying the records held and their locations. There is also no dedicated or organised filing space specifically for Community Care Finance. Instead, files are stored securely in a room alongside other social work files in boxes but not in alphabetical order. Files actively being worked on by officers may be located in the Community Care Finance office or at officer's homes due to homeworking practices. However, there is no log maintained of files removed by staff. All files requested for audit sampling were located, either in the storage room, Community Care Finance office, or at officers' homes and were made available to Internal Audit over a period of time. The lack of a system for documenting records held/extracted is not conducive to easy access A filing system should be implemented to ensure that all financial assessments and related records are secure, easily identifiable, and can be located at all times. As detailed in Recommendation 2, further exploration into the digitisation of the information held should be undertaken. Additionally, due to homeworking arrangements and the storage of files at officers homes, a record log detailing the location of these files should also be maintained. All officers should also be reminded of the importance of good data protection arrangements in the storage of information within their own homes. Page 53
Page 54
10 or the proper control of supported person's records. Management Response Responsible Officer Accepted (Yes/ No) Timescale for Implementation (Date Required) Agreed Management Action/Management Comment Interim Finance Manager Yes 31/08/2025 An online filing system is to be implemented to eliminate need for manual storage and handling. The Mailroom Service has agreed to scan all backlog records and a new process is in place for scanning new files. Page 54
Page 55
11 Ref Risk Ratings for Recommendations Audit Finding Audit Recommendation 4 Medium A care needs assessment is required before an individual enters a care home. This assessment is usually undertaken by a community care officer or social worker to determine the level of care and support needed. If a care home is considered the most appropriate care option, a financial assessment is then required to determine how much an individual should contribute towards the cost of their care. This assessment considers income, savings and capital to decide whether and how much financial assistance can be provided. The National Care Home Contract (NCHC) standard or nursing rate is paid gross to the care home for a resident until the financial contribution has been determined. Any subsequent overpayment, calculated from the financial assessment, is recovered from future payments made to the care home. The audit undertook a review of the financial assessment process for individuals entering a care home. From a random sample of 20 cases, 8 were identified where there were delays by the Community Care Finance Service, taking The operational demands within the Community Care Finance Service are appreciated. However, as already detailed within this report, the implementation of greater digitisation of processes and storage of information will deliver improved efficiencies. Consideration should also be given to reviewing the roles and responsibilities of officers, which may also highlight where changes in current working practices will deliver improved service performance. In addition, the development of comprehensive performance information to support improved monitoring of service delivery should be undertaken. Page 55
Page 56
12 between 5 weeks and 3 months to request information from a resident to be used in the financial assessment to determine an individual's financial contribution towards their care home costs. As care home rates are paid gross to the providers until a resident's financial contribution is determined, this may result in the need to recover significant sums from future payments. It is appreciated that further delays can occur due to the time taken for a resident to provide the information required to undertake a financial assessment. However, it was noted that significant delays were still observed in carrying out financial assessments after the requested information had been received. The audit reviewed a sample of 20 financial assessments and found 7 cases where delays ranging from 4 weeks to 3 months occurred in completing the evaluation. These duties are undertaken by only one officer, and at the time of the audit, 363 referrals for financial assessments had been undertaken in the 11 months of 2024/25. It is also acknowledged that the complexity and level of input required can vary significantly when determining an individual's financial contribution towards their care home costs. Page 56
Page 57
13 Management Response Responsible Officer Accepted (Yes/ No) Timescale for Implementation (Date Required) Agreed Management Action/Management Comment Interim Finance Manager Yes 31/03/2027 The digitisation of the financial assessment process will be part of the Carefirst replacement system. In the interim, the financial assessment process has been divided into different administrative roles, and written procedures have been completed. This should help improve the flow of information and reduce timescales for financial assessment completion. Page 57
Page 58
14 Ref Risk Ratings for Recommendations Audit Finding Audit Recommendation 5 Medium A "self-funder" is someone who pays for their care home fees from their own resources. This typically applies when an individual entering a care home has capital in excess of £35,000 (for 2024/25). The self-funder pays their care fees directly to the care home, and the Council is only be liable to pay the free personal care rate as stipulated by the Scottish Government. There is no requirement for a full financial assessment of a self-funder, only a declaration is required as part of the application for the free personal care payment. As detailed in Finding 4, delays were noted within the Community Care Finance Service in undertaking financial assessments to determine the financial contribution required when an individual enters a care home. The audit noted that even for self-funders, payments are being made to care homes at the gross rate. Once the financial assessment is completed and the individual is confirmed as a self-funder, the overpaid expenditure is recovered from the care home. Consideration should be given to refining the assessment processes for individuals entering a care home, to enable the early identification of potential self-funders and ensure that appropriate accounting arrangements are applied from the outset. Page 58
Page 59
15 Management Response Responsible Officers Accepted (Yes/ No) Timescale for Implementation (Date Required) Agreed Management Action/Management Comment Head of Service / Interim Finance Manager Yes 30/09/2025 Discussions have been held with Head of Service to ensure Social Workers resume this activity and issue appropriate documentation to enable self-funder identification and processing at the earliest opportunity. Page 59
Page 60
16 Ref Risk Ratings for Recommendations Audit Finding Audit Recommendation 6 Low The scope of this audit included a review to verify the accuracy of the 4 weekly payments made to care homes. It was noted that, as part of the verification process, a paper record is maintained for each resident in each care home, detailing the 4 weekly payments to be made. This record is updated and cross- checked against information in the social work and social care case management system (CareFirst) producing the payment batches, to confirm accuracy. In addition, the paper record is used to calculate any payment adjustments required due to changes in a resident's circumstances. These paper payment records are held individually by the officers responsible for specific care homes. As these officers work from home, the records are not digitised or centrally stored, which limits accessibility for other officers in the event of a query or when further scrutiny is required. The payment records maintained for each resident within a care home should be digitised to improve accessibility and ensure they are readily available to management and other officers within the service. Page 60
Page 61
17 Management Response Responsible Officer Accepted (Yes/ No) Timescale for Implementation (Date Required) Agreed Management Action/Management Comment Interim Finance Manager Yes 31/03/2026 System for moving payment records online is underway. A care home is being trialled and there will then be a roll out to the rest of the care homes. Page 61
Page 62
18 Ref Risk Ratings for Recommendations Audit Finding Audit Recommendation 7 Low Payments are made to care home providers on a four-weekly basis and are accompanied by a remittance report that provides a breakdown of the residents at each home. In addition, care homes are contractually required to notify the Social Care Service of any changes in residents' circumstances that may affect ongoing payments. However, it was noted that the Community Care Finance Service also issues a separate payment schedule fortnightly to each care home. The schedule lists the residents and the rates to be paid to each care home. Care homes are expected to confirm the accuracy of this schedule and return the completed form to the Community Care Finance Service. The audit found a low return rate of these forms from care home providers, and non-submissions are not followed up. Discussions with the Service indicated that the requirement for this fortnightly schedule is historical and likely dates back to a previous payment arrangement with care homes. Consideration should be given to whether there is an ongoing need to send the fortnightly estimated payment schedules to all care homes. Page 62
Page 63
19 Management Response Responsible Officer Accepted (Yes/ No) Timescale for Implementation (Date Required) Agreed Management Action/Management Comment Interim Finance Manager Yes 31/08/2025 Schedules have been confirmed as a historic practice no longer required given care home contractual requirements and resident details provided to homes on payments made. Practice to be ceased. Page 63
Page 64
20 Appendix 1 AUDIT TERMS OF REFERENCE AND DEFINITIONS 1. Audit Objectives 1.1 The overall audit objective is to provide an objective independent opinion on the adequacy and effectiveness of controls / processes. 1.2 The audit will for each controls / process being considered: • Walkthrough the processes to consider the key controls; • Conduct sample testing of the identified key controls, and • Report on these accordingly 1.3 All audit reviews are carried out in accordance with Public Sector Internal Audit Standards (PSIAS). 2. Definitions for Auditing Opinions and Findings 2.1 In order to assist management in using our reports: The Internal Auditor will categorise audit assurance opinion according to their overall assessment of the risk management system, effectiveness of the controls in place and the level of compliance with these controls and the action being taken to remedy significant findings or weaknesses. Assurance Level System and Testing Conclusion Full The controls tested are being consistently applied Substantial There is evidence that the level of non compliance with some of the controls may put some of the system objectives at risk. Limited The level of non compliance puts the system objectives at risk. None Significant non-compliance with basic controls leaves the system open to error or abuse. 2.2 Risk ratings for each recommendation is based on the following criteria: High Fundamental control weaknesses that require immediate attention by management to action and mitigate significant exposure to risk Medium Less critically important controls absent, not being operated as designed or could be improved Low Lower level controls absent, not being operated as designed or could be improved. Page 64
Page 65
21 Appendix 2 STATEMENT OF RESPONSIBILITY The responsibility for designing and maintaining a sound system of internal control to prevent and detect fraud and other irregularities rests with management, with internal audit providing a service to management to support them to achieve this objective. The Internal Audit Section will assess the adequacy and effectiveness of the system of internal control arrangements implemented by management and perform sample testing on those controls in the period under review with a view to providing an opinion on the extent to which risks in this area are managed. The Internal Audit Section will undertake testing with the objective of detecting significant control weaknesses. However, the audit approach alone should not be relied upon to identify all strengths and weaknesses in internal controls nor to find any fraud or irregularity. Even sound systems of internal control can only provide reasonable and not absolute assurance and may not be proof against collusive fraud. The matters raised in this report are only those that came to our attention during the course of the audit review and are not necessarily a comprehensive statement of all the weaknesses that exist or all improvements that might be made. Recommendations for improvements should be assessed by management for their full impact before they are implemented. The performance of the audit review undertaken should not be taken as a substitute for management’s responsibilities for the application of sound management practices. This report must not be disclosed to any third party or reproduced in whole or in part without the written consent of the Moray Council’s Audit and Risk Manager. Page 65
Page 66
Page 66
Page 67
Report to: Audit and Scrutiny Committee Meeting Date: 10 September 2025 Report by: Service Manager Internal Audit and Risk Report No: GSP047/25/DL Author: Dafydd Lewis Contact Email: dafydd.lewis@moray.gov.uk Subject: Public Sector Internal Audit Standards - External Quality Assessment of the Internal Audit Section - Follow Up Review 1. PURPOSE ☒ For Decision ☐ For Information 1.1 The purpose of this report is to provide Committee with an update on the implementation of recommendations detailed within the external quality assessment undertaken on the Council’s Internal Audit Section. 1.2 This report is submitted to Committee in terms of Section III (I) (6) of the Council’s Scheme of Administration relating to the consideration of reports in overseeing the independence, objectivity, performance and conformance to professional standards of internal audit. 2. SUMMARY 2.1 The Local Authority Accounts (Scotland) Regulations 2014 paragraph 7 requires that ‘a local authority must operate a professional and objective internal auditing service in accordance with recognised standards and practices in relation to internal auditing’. 2.2 The recognised standards adopted by all Scottish councils are the Public Sector Internal Audit Standards (PSIAS) developed by standard setters, including the Chartered Institute of Public Finance and Accountancy and the Chartered Institute of Internal Auditors. The standards include a requirement for an External Quality Assessment (EQA) of internal audit once every five years and for the findings to be considered at a meeting of a Council committee. An EQA of the Council’s Internal Audit Section was completed last year by the Chief Internal Auditor of Perth and Kinross Council. The findings were reported to this Committee on 11 September 2024 (paragraph 10 of the minutes refers). This report Item 9. Page 67
Page 68
provides an update on the implementation of recommendations contained within this EQA report. 3. RECOMMENDATIONS 3.1 It is recommended that Committee considers and notes the contents of this report, seek clarification on any points. Dafydd Lewis Service Manager Internal Audit and Risk 4. BACKGROUND AND CONTEXT 4.1 Through the Scottish Local Authorities Chief Internal Auditors’ Group, in which the Council participates, it was agreed that the EQA requirement could be met through a peer review process. This required each council’s chief internal auditor to lead a review of another council’s internal audit service and receive a review in return. Perth and Kinross Council was selected to undertake the assessment of the Moray Council’s Internal Audit Section. 4.2 An assessment took place in March 2024, during which the Chief Internal Auditor of Perth and Kinross Council reviewed the operating arrangements within Moray against the PSIAS. This involved the verification of a portfolio of evidence, interviews with the Chair of the Audit and Scrutiny Committee, the Chief Executive, and the Head of Governance, Strategy and Performance, as well as discussions and file reviews with officers within the Internal Audit Section. 4.3 The overall conclusion of the external assessment is that Moray Council’s Internal Audit Section fully conforms with the PSIAS. This represents the highest level of conformance and should reassure members and senior management about the effectiveness of the Internal Audit Section’s operating arrangements. However, the report included several recommendations, highlighting the need to reinforce Internal Audit’s role as an independent appraisal function for the Council and its partner organisations, as well as concerns regarding the availability of staffing resources. 4.4 A follow-up review has been undertaken by the Senior Auditor to evidence the implementation of the recommendations. The Follow-Up Report is included in Appendix 1. It is pleasing to confirm that the majority of the recommendations have been implemented. However, in accordance with PSIAS, despite the recent appointment of a temporary part-time auditor, concerns remain regarding the current staffing resources. Senior management and members of this Committee will be kept informed of any impact resulting from the staffing situation and the potential implications for the future delivery of the internal audit service. 5. PROPOSALS Page 68
Page 69
5.1 The Committee considers and notes the progress made in implementing the recommendations detailed in the External Quality Assessment Report of the Internal Audit Section. 6. SUMMARY OF IMPLICATIONS 6.1 The table below shows whether risks and implications apply if the recommendations are agreed: SUBJECT YES NO Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) × Policy and Legal × Financial × Risk × Staffing × Best Value and Transformation × Property × Information Communications Technology/Digital × Equalities. Social Inclusion and Economic Impact × Climate Change, Biodiversity and Sustainability × 6.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP)) Improved Collaborative Leadership, as part of continuous improvement through Best Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. a) Links to Council Corporate Plan – The proposals in this report support and contribute to improved outcomes for communities as outlined in the following Council Plan strategic priorities: ☐ Tackle Poverty and Inequality. ☐ Build Stronger Greener Vibrant Economy. ☐ Build Thriving, resilient, empowered Communities. b) Links to Local Outcomes Improvement Plan – The proposals in this report support and contribute to improved outcomes for communities as outlined in the following local Outcomes Improvement Plan priorities: ☐ Developing a diverse, inclusive, and sustainable economy ☐ Building a better future for our children and young people in Moray. ☐ Empowering and connecting communities. ☐ Improving wellbeing of our population 6.3 Policy and Legal No implications directly arising from this report. 6.4 Financial No implications directly arising from this report. Page 69
Page 70
One off Costs: Service Area Budget Budget Years Proposed Spend this Year Virement From Other Comments Annually Recurring Costs: Service Area Budget With Effect From Annual Net Impact Virement From (if applicable) Other Comments 6.5 Risk The independent review of selected systems and procedures mitigates the risk associated with inadequate or ineffective control procedures. 6.6 Staffing No implications directly arising from this report. 6.7 Best Value and Transformation Internal audit work supports good governance and the delivery of efficient services. 6.8 Property No implications directly arising from this report. 6.9 Information Communications/Technology/Digital No implications directly arising from this report. 6.10 Equalities, Social Inclusion and Economic Impact No implications directly arising from this report. 6.11 Climate Change and Biodiversity Impacts No implications directly arising from this report. 7. CONSULTATION 7.1 There have been no direct consultations during the preparation of this report. 8. BACKGROUND PAPERS 8.1 None Page 70
Page 71
APPENDIX 1 XXX 2020 Page 1 EXTERNAL QUALITY ASSESSMENT 2 OF MORAY COUNCIL’S INTERNAL AUDIT SERVICE Report Recipients: J Mundell, Interim Chief Executive D Whitworth, Depute Chief Executive (Education, Communities & Organisational Development) A McEachan, Head of Governance, Strategy & Performance D Lewis, Chief Audit Executive (Audit and Risk Manager) Councillor G Leadbitter, Chair of Audit & Scrutiny Committee Page 71
Page 72
EXECUTIVE SUMMARY 2 1. INTRODUCTION 1.1 The mandatory Public Sector Internal Audit Standards (PSIAS), published initially in April 2013 and updated most recently in March 2017, apply to all internal audit service providers in the UK public sector, whether in-house, provided via a shared service arrangement or outsourced. To supplement the PSIAS and provide specific guidance surrounding its application within a local government setting, the Chartered Institute of Public Finance and Accountancy (CIPFA) compiled a Local Government Application Note, which was last updated in 2019. 1.2 The objectives of the PSIAS are to define the nature of internal auditing within the UK public sector; set basic principles for carrying out internal audit; establish a framework for providing internal audit services, which add value to the organisation, leading to improved organisational processes and operations; establish the basis for the evaluation of internal audit performance and drive improvement planning. 1.3 The PSIAS require the Chief Audit Executive (the Audit and Risk Manager in Moray Council) to develop and maintain a quality assurance and improvement programme (QAIP) that covers all aspects of the internal audit activity. The QAIP must include both periodic internal self-assessments and five-yearly external assessments, carried out by a qualified, independent assessor from outwith the organisation, and enable evaluation of the internal audit activity’s (Internal Audit in Perth & Kinross Council) conformance with the PSIAS, including the Mission of Internal Audit, Definition of Internal Auditing and Code of Ethics. In addition, the QAIP should also assess the efficiency and effectiveness of the internal audit activity and identify opportunities for improvement. 1.4 To assist its members to meet the five-yearly external assessment requirement, the Scottish Local Authorities Chief Internal Auditors’ Group (SLACIAG) established a collaborative system of formal peer reviews. This approach not only assists with ensuring that independent assessors, and their teams, have appropriate knowledge and experience of the local government internal audit environment but also removes the financial burden from councils, associated with procuring these services externally. The allocation of assessors / assessment teams to councils participating in the peer review process was undertaken autonomously, ensuring that, amongst other governing principles, local authorities with perceived / known conflicts of interest could not review one another. At the outset, assessors were required to formally declare any interests so that these could be appropriately addressed during the allocation process. Perth & Kinross Council was selected to carry out the external assessment in Moray Council. 1.5 To support the peer review process, SLACIAG developed a comprehensive External Quality Assessment (EQA) framework, including an EQA Checklist for Assessing Conformance with the PSIAS and the Local Government Application Note (EQA Checklist) and a key Stakeholder Questionnaire proforma. The external assessment of Moray Council’s Internal Audit Service has been carried out by Perth & Kinross Council’s Internal Audit service utilising this framework. 1.6 This report provides a high level summary of requirements for each standard per the PSIAS and CIPFA Local Government Application Note and sets out the findings, conclusions and recommendations from the external assessment, which involved discussions with key members of staff, including the Chief Audit Executive, review of the most recent self-assessment carried out utilising the EQA Checklist and consideration of other relevant supporting documentation / information (Evidence Pack) including working paper files and completed stakeholder questionnaires. A comprehensive list of supporting documentation / information and completed stakeholder questionnaires considered as part of the assessment can be found at appendices B and C respectively. Page 72
Page 73
3 2. OVERALL CONCLUSION 2.1 The overall conclusion of the external assessment is that Moray Council’s Internal Audit Service fully conforms with the PSIAS. However, it should be noted that Standard ref No. 1100.2 Independence & Objectivity have been assessed as generally conforms and steps should be taken to address the associated areas for improvement. A full summary of assessment, per assessment area, can be found at Appendix A. A summary of totals is as follows: Fully Conforms Generally Conforms Partially Conforms Does Not Conform TOTALS 13 1 0 0 2.2 The main areas for improvement highlighted in the report are as follows: • Enhancing the organisational independence of the Chief Audit Executive by including the role of the post within the Scheme of Delegation • Ensuring clarity over areas where the Chief Audit Executive has functional responsibility 2.3 Full details of the assessment recommendations and management responses can be found in the Action Plan at Appendix D. Page 73
Page 74
4 3. SECTION A – MISSION OF INTERNAL AUDIT AND CORE PRINCIPLES The PSIAS state that the Mission of Internal Audit articulates what internal audit aspires to accomplish within an organisation, which is ‘to enhance and protect organisational value by providing risk-based and objective assurance, advice and insight’. Taken as a whole, the Core Principles for the Professional Practice of Internal Auditing, as set out in the PSIAS, articulate internal audit effectiveness. For an internal audit function to be considered effective, all Core Principles should be present and operating effectively. Failure to achieve any of the Core Principles would imply that an internal audit activity was not as effective as it could be in achieving the Mission of Internal Audit. 3.1 Evidence obtained from assessing conformance with other standards in the PSIAS has been used, along with specific consideration surrounding the achievement of the Core Principles, to conclude that the Internal Audit Service at Moray Council fully conforms with accomplishing the Mission of Internal Audit as detailed above. 4. SECTION B – DEFINITION OF INTERNAL AUDITING The PSIAS state that internal auditing is an independent, objective assurance and consulting activity designed to add value and improve an organisation’s operations. It helps an organisation accomplish its objectives by bringing a systematic, disciplined approach to evaluate and improve the effectiveness of risk management, control and governance processes. 4.1 Evidence obtained from assessing conformance with other standards in the PSIAS has been used to conclude that the Internal Audit Service at Moray Council fully conforms with the definition of Internal Auditing as detailed above. The main reasons for this assessment include the Internal Audit Charter and engagement with stakeholders. 5. SECTION C – CODE OF ETHICS The PSIAS state that the purpose of the Institute of Internal Auditor’s Code of Ethics is to promote an ethical culture in the profession of internal auditing. A code of ethics is necessary and appropriate for the profession of internal auditing, founded as it is on the trust placed in its objective assurance about risk management, control and governance. Internal auditors in UK public sector organisations must conform to the Code of Ethics as set out in the PSIAS. If individual internal auditors have membership of another professional body then he or she must also comply with the relevant requirements of that organisation. 5.1 Evidence obtained from assessing conformance with other standards in the PSIAS, in particular the Attribute Standards 1000 – Purpose Authority and Responsibility, 1100 – Independence and Objectivity, 1200 – Proficiency and Due Professional Care and Professional Standards 2000 – Managing the Internal Audit Activity and 2300 – Performing the Engagement, has been used to conclude that Moray Council’s Internal Audit Service fully conforms with the requirement to comply with the Code of Ethics. Page 74
Page 75
5 6. SECTION D – ATTRIBUTE STANDARDS Attribute Standards apply to organisations and individual internal auditors providing the internal audit services in a local authority. 6.1 1000 - Purpose, Authority, and Responsibility The PSIAS state that the purpose, authority and responsibility of the internal audit activity must be formally defined in an Internal Audit Charter, consistent with the Mission of Internal Audit and the mandatory elements of the International Professional Practices Framework. The chief audit executive must periodically review the internal audit charter and present it to senior management and the board for approval. The internal audit charter must also: • define the terms ‘board’ and ‘senior management’ for the purposes of internal audit activity; • cover the arrangements for appropriate resourcing; • define the role of internal audit in any fraud-related work; and • describe safeguards to limit impairments of independence or objectivity if internal audit or the chief audit executive undertakes non-audit activities. 6.1.1 Moray Council’s Internal Audit Charter is periodically reviewed with the most recent review taking place in 2022. The Internal Audit Charter was approved by the Audit & Scrutiny Committee on 23 November 2022. 6.1.2 Having considered the findings above, it has been concluded that the Internal Audit Service at Moray Council fully conforms with Standard 1000 on Purpose, Authority and Responsibility. 6.2 1100 - Independence and Objectivity The internal audit activity must be independent and internal auditors must be objective in performing their work. Various aspects of independence and objectivity are covered in this standard as well as 1200, including reporting functional lines of the CAE, the relationship between the CAE and the board and any impairment to individual internal auditors’ objectivity or independence. Reporting and management arrangements must be put in place that preserve the CAE’s independence and objectivity, in particular with regard to the principle that the CAE must be independent of the audited activities. 6.2.1 The Chief Audit Executive reports functionally to the Audit & Scrutiny Committee and administratively to the Head of Governance, Strategy & Performance, who is a member of the Council’s Corporate Management Team. The Chief Audit Executive has direct and unrestricted access to the Chief Executive and the Chair of the Audit & Scrutiny Committee and this has been confirmed through Stakeholder engagement. These reporting / access arrangements are defined within the job description of the Chief Audit Executive but not specifically within the Internal Audit Charter. The Audit Charter does contain reference to arrangements for safeguards to limit impairment of independence or objectivity on behalf of the audit team. 6.2.2 In support of organisational independence, the Chief Audit Executive attends the Audit & Scrutiny Committee meetings to present all internal audit reports (including, for example, the Internal Audit Charter, Annual Report, Internal Audit Plan and reports / executive summaries from the planned audits) to Elected Members. The reports are all submitted in the Chief Audit Executive’s name. 6.2.3 The Chief Audit Executive has functional and operational responsibility for non-audit activities, namely supporting business continuity and risk management arrangements within services. This function is operationally kept separate from the delivery of internal audit. but this, and the potential for impairment to the Chief Audit Executive’s Page 75
Page 76
6 independence and objectivity, is not clearly communicated to stakeholders through the Audit Charter. 6.2.4 All staff within the Internal Audit service are required to complete a declaration form, that includes the requirement to raise any issues or concerns where a conflict of interest may arise on an annual basis. 6.2.5 There is scope for improving clarity regarding reporting lines by explicitly stating reporting lines within the Audit Charter 6.2.6 Furthermore, there is scope to consider the Chief Audit Executive’s delegated authority within the Scheme of Delegation. 6.2.7 Where the Chief Audit Executive has roles and responsibility in addition to Internal Audit, this should be clearly communicated to the Audit & Scrutiny Committee and Senior Officers. The Audit Charter should be updated in this regard to ensure that there are clear arrangements for ensuring the independence and objectivity of the Internal Audit function. 6.2.8 Moray Council’s Internal Audit Service generally conforms with Standard 1100 on Independence and Objectivity. 6.3 1200 - Proficiency and Due Professional Care The CAE must be professionally qualified, suitably experienced and responsible, in accordance with the organisation’s human resources processes, for recruiting appropriate staff. He or she is responsible for ensuring that up-to-date job descriptions exist, reflecting roles and responsibilities, and that person specifications define the required qualifications, competencies, skills, experience and personal attributes. The CAE should periodically assess individual auditors’ skills and competencies against those set out in the relevant job descriptions and person specifications. Any training or development needs identified should be included in an appropriate ongoing development programme that is recorded and regularly reviewed and monitored. In addition, all internal auditors have a personal responsibility to undertake a programme of continuing professional development (CPD) to maintain and develop their competence. This may be fulfilled through requirements set by professional bodies or through the organisation’s own appraisal and development programme. Auditors should maintain a record of such professional training and development activities. The internal audit activity should be appropriately resourced to meet its objectives. It should have appropriate numbers of staff in terms of grades, qualifications, personal attributes and experience or have access to appropriate resources in order to meet its objectives and to comply with these standards. The PSIAS states that the CAE must obtain competent advice and assistance if the activity is unable to perform all or part of an engagement. 6.3.1 The Chief Audit Executive holds a relevant professional qualification and is suitably experienced, with over 30 years internal audit experience within local government. The Chief Audit Executive is a member of SLACIAG and regularly attends and contributes to meetings. In relation to the two SLACIAG Sub-groups, the Computer Audit Sub- Group (CASG) and the Scottish Local Authorities Investigators Group (SLAIG), Moray Council’s Internal Audit team is represented on both. Page 76
Page 77
7 6.3.2 To support the Chief Audit Executive in Moray Council’s Internal Audit service there is one Senior Auditor, who is also suitably qualified and experienced. There are a total of 3.8 FTE members of staff in the Internal Audit service, including the Chief Audit Executive and Senior Auditor. The Internal Audit Service delivers internal audit services to Moray Council, Moray Integration Joint Board, the Grampian Valuation Board and Moray Growth Deal. Whilst there are no specialist computer auditors or fraud investigators, the Chief Audit Executive is a member of the Computer Audit Sub Group and the team contains officers who are experienced in fraud and corruption investigations. 6.3.3 All Internal Audit team members participate in Moray Council’s corporate Employee Review and Development process. 6.3.4 The Internal Audit Service is represented on a number of corporate groups, including the Information Assurance Group and the Leadership Forums, and may be asked to advise other Council groups on specific issues connected with the control environment. 6.3.5 The Chief Audit Executive, Senior Auditor and one auditor have specific CPD requirements to adhere to, with the remaining team member currently undertaking professional training with the Institute of Internal Auditors. Training records are held. 6.3.6 Engagement with key stakeholders, as part of the validation of the self assessment process has confirmed that the Chief Audit Executive demonstrates sufficient knowledge and experience and that all members of the Internal Audit Service exercise due professional care. 6.3.7 Consideration should be given to the size of the Internal Audit team in order to ensure that the Internal Audit Service meet its objectives for all organisations that it provides internal audit services to (as detailed in 6.3.2). 6.3.8 Moray Council’s Internal Audit Service fully conforms with standard 1200 on Proficiency and Due Professional Care. 6.4 1300 - Quality Assurance and Improvement Programme The PSIAS state that the Chief Audit Executive must develop and maintain a quality assurance and improvement programme (QAIP) that covers all aspects of the internal audit activity. The QAIP must include both periodic internal self-assessments and five-yearly external assessments, carried out by a qualified, independent assessor from outside the organisation, and enable evaluation of the internal audit activity’s conformance with the PSIAS, including the Definition of Internal Auditing and Code of Ethics. In addition, the QAIP should also assess the efficiency and effectiveness of the internal audit activity and identify opportunities for improvement. The public sector requirement in the PSIAS states that results of the QAIP and progress against any improvement plans must be reported in the annual report. 6.4.1 Internal audit reports are reviewed by the Chief Audit Executive prior to issue and working papers are reviewed by either the Chief Audit Executive or Senior Internal Auditor. Where the assignment is carried out by the Senior Internal Auditor, the Chief Audit Executive will review the working paper file. 6.4.2 Client feedback is actively pursued by the Internal Audit Service for assignments carried out within Moray Council. Page 77
Page 78
8 6.4.3 Performance measures are in place to monitor the performance of the Internal Audit service. These include the audit plan delivery and the budget surrounding the plan. The performance against these measures is reported to Audit & Scrutiny Committee as part of the Annual Audit Report and Opinion. 6.4.4 The EQA Checklist has been used for a formal self-assessment of compliance with the PSIAS. The Quality Assurance Improvement Plan was provided to the Audit & Scrutiny Committee, with ongoing compliance being reported in subsequent years. 6.4.5 Moray Council’s Internal Audit Service fully conforms with Standard 1300 on Quality Assurance and Improvement Programme. 7. SECTION E – PERFORMANCE STANDARDS Performance Standards describe the nature of the internal audit services being provided and provide criteria against which the performance of an internal audit function can be measured. 7.1 2000 - Managing the Internal Audit Activity The chief audit executive must effectively manage the internal audit activity to ensure it adds value to the organisation. The internal audit activity is effectively managed when it achieves the purpose and responsibility included in the internal audit charter, it conforms with the PSIAS, its individual members conform with the Code of Ethics and the PSIAS and it considers trends and emerging issues that could impact the organisation. The internal audit activity adds value to the organisation and its stakeholders when it considers strategies, objectives and risks; strives to offer ways to enhance governance, risk management, and control processes; and objectively provides relevant assurance. 7.1.1 An annual Internal Audit Plan is compiled by the Chief Audit Executive outlining the planned programme of work to be undertaken. A review is undertaken of the Audit Universe, taking account of internal audit risk assessment and historic internal audit activity over a 5 year period. Consideration is given to the Corporate Risk Register (compiled by Heads of Services supported by the Business Continuity and Risk Management Officer), as well as corporate transformation and improvement plans. The Corporate Management Team, Heads of Services, Council Leader and the Chair of the Audit and Scrutiny Committee are also consulted and asked if there are any projects they want to be included in the Annual Audit Plan. Contact is made with the External Auditor to detail the projects contained within the Audit Plan. 7.1.2 The draft Internal Audit Plan is presented to the Audit & Scrutiny Committee for formal approval. 7.1.3 Progress towards completion of the Internal Audit Plan, and the individual audits contained within it are reported to each Audit & Scrutiny Committee, which routinely take place five times a year. 7.1.4 Managers are asked to complete a feedback questionnaire from the reviews undertaken, which is assessed to determine whether any improvements are needed to the audit process. 7.1.5 Moray Council’s Internal Audit Service fully conforms with Standard 2000 on Managing the Internal Audit Activity. Page 78
Page 79
9 7.2 2100 - Nature of Work The internal audit activity must evaluate and contribute to the improvement of the organisation’s governance, risk management, and control processes using a systematic, disciplined, and risk-based approach. Internal audit credibility and value are enhanced when auditors are proactive and their evaluations offer new insights and consider future impact. More specifically, the internal audit activity must assess and make appropriate recommendations to improve the organisation’s governance processes, evaluate the effectiveness and contribute to the improvement of risk management processes and assist the organisation in maintaining effective controls by evaluating their efficiency and effectiveness and promoting continuous improvement. 7.2.1 The Chief Audit Executive includes an appropriate balance of work within the Plan to evaluate and contribute to the improvement of the Council’s governance, risk management and control processes. Findings re coverage of governance, risk management and control processes. 7.2.3 Moray Council’s Internal Audit Service fully conforms with Standard 2100 on Nature of Work. 7.3 2200 - Engagement Planning Internal auditors must develop and document a plan for each engagement, including the engagement’s objectives, scope, timing and resource allocations. The plan must consider the organisation’s strategies, objectives and risks relevant to the engagement. The CIPFA Local Government Application note states that for each engagement, a brief should be prepared, discussed and agreed with relevant managers. The brief should establish the objectives, scope and timing for the assignment and its resource and reporting requirements. Audit work should be undertaken using a risk-based audit approach. 7.3.1 The Audit Plan includes a brief summary of the scope for each audit, which is developed more fully prior to the commencement of the audit. The audit programme is compiled by the auditor and is reviewed by the Chief Audit Executive or Senior Auditor to ensure that the programme is consistent with, and will provide sufficient evidence for arriving at an opinion on, the agreed scope. 7.3.2 Moray Council’s Internal Audit Service fully conforms with Standard 2200 on Engagement Planning. 7.4 2300 - Performing the Engagement Internal auditors must identify, analyse, evaluate and document sufficient information to achieve the engagement’s objectives. At each stage of the audit, auditors should consider what specific work needs to be conducted and evidence needs to be gathered to achieve the engagement objectives and support an independent and objective audit opinion. Systems should be in place to ensure that auditors obtain and record, within the working papers, sufficient evidence to support their conclusions, professional judgements and recommendations. Working papers should always be sufficiently complete and detailed to enable an experienced internal auditor with no previous connection with the audit to ascertain what work was performed, re-perform it if necessary and support the conclusions reached. The CAE should also specify how long all audit documentation should be retained, whether held on paper or electronically. All audit work should be subject to an appropriate internal quality review process. Internal auditors must be alert to the possibility of intentional wrongdoing, errors and omissions, poor value for money, failure to comply with management policy and conflicts Page 79
Page 80
10 of interest when performing their individual audits. They must also have sufficient knowledge to identify indicators that fraud or corruption may have been committed. 7.4.1 The Internal Audit Manual details the procedures for use within Moray Council’s Audit Service. The Manual is supported by the Pentana system, which is an audit automation tool supporting the service’s management and control workflow. 7.4.2 All audit files are stored electronically within Pentana. 7.4.3 Evidence for file and report reviews, which are undertaken by the Chief Audit Executive or the Senior Auditor, is retained within Pentana. 7.4.5 Records management arrangements are appropriate and consider GDPR. 7.4.6 Moray Council’s Internal Audit Service fully conforms with Standard 2300 on Performing the Engagement. 7.5 2400 - Communicating Results The basic aims of every internal audit report should be to: • give an opinion on the risk and controls of the area under review, building up to the annual opinion on the overall adequacy and effectiveness of the organisation’s framework of governance, risk management and control; • prompt management to implement the agreed actions for change leading to improvement in the control environment and performance; and • provide a formal record of points arising from the audit and, where appropriate, of agreements reached with management, together with appropriate timescales. Each report should include the scope and purpose of the audit to help the reader to understand the extent, or limitations, of the assurance(s) provided by the report. During the course of the audit, key issues should be brought to the attention of the relevant manager to enable them to take corrective action and to avoid surprises at the closure stage. Before issuing the final report, the internal auditor should normally discuss the contents with the appropriate levels of management to confirm the factual accuracy, to seek comments and to confirm the agreed management actions. A draft report is useful for this purpose. Recommendations should be prioritised according to risk. The recommendations and the resultant management action plans should be agreed prior to the issue of the final report. Any areas of disagreement between the internal auditor and management that cannot be resolved by discussion should be recorded in the action plan and the residual risk highlighted. Those weaknesses giving rise to significant risks that are not agreed should be brought to the attention of a more senior level of management and the board. As set out in the PSIAS, the CAE must deliver an annual internal audit opinion and report that can be used by the organisation to inform its annual governance statement. This must include the annual internal audit opinion concluding on the overall adequacy and effectiveness of the organisation’s governance, risk and control framework, a summary of the audit work from which the opinion is derived (including reliance placed on work by other assurance bodies); and a statement of conformance with the PSIAS and the results of the internal audit QAIP. 7.5.1 Draft reports are prepared for each audit assignment by the lead auditor and reviewed by the Chief Audit Executive or Senior Auditor. This includes assessing the strength of controls in place within the audited area. 7.5.2 Once factual accuracy has been confirmed with the service being audited, the action plan is completed, with any issues being addressed with the relevant Head of Service before the report is passed for presentation to the Audit & Scrutiny Committee. Page 80
Page 81
11 7.5.3 The work of the Internal Audit service for the year is considered, summarised and forms part of the overall opinion that is provided annually by the Chief Audit Executive. 7.5.4 Engagement with stakeholders during the validation of the EQA confirms that this process is understood, respected and valued by the organisation. 7.5.5 Moray Council’s Internal Audit Service fully conforms with Standard 2400 on Communicating Results. 7.6 2500 - Monitoring Progress The PSIAS place responsibility for monitoring progress with the CAE to ensure that management actions have been effectively implemented or, if not, that senior management have accepted the risk of not taking action. The CAE must, therefore, implement a follow-up process for ensuring the effective implementation of audit results or ensuring senior management are aware of the consequences of not implementing an action point and are prepared to accept the risk of such consequences occurring. The results of this process should be communicated to the board. The CAE should develop escalation procedures for cases where agreed actions have not been effectively implemented by the date agreed. These procedures should ensure that the risks of not taking action have been understood and accepted at a sufficiently senior management level. The effective involvement of the board in the follow-up process is critical to ensuring that it works. The CAE should consider revising the internal audit opinion in light of findings from the follow-up process. The findings of follow-up reviews should inform the planning of future audit work. 7.6.1 The audit follow-up review process is documented within the Internal Audit Manual. Follow-up audits take place following the last date of implementation for all recommendations. A control record is maintained to monitor when audits are due for follow up. Follow-up audits are reviewed by the CAE or Senior Auditor, following which they are now reported to Audit & Scrutiny Committee. 7.6.3 Moray Council’s Internal Audit Service fully conforms with Standard 2500 on Monitoring Progress. 7.7 2600 - Communicating the Acceptance of Risks When the chief audit executive concludes that management has accepted a level of risk that may be unacceptable to the organisation, they must discuss the matter with senior management. If the chief audit executive determines that the matter has not been resolved, they must communicate the matter to the board. It is not the responsibility of the chief audit executive to resolve the risk. 7.7.1 All audits on systems and practices are reported to the Board including Management responses to recommendations. Where a recommendation is made which is not accepted by management, which has been found to be rare, the Chief Audit Executive presents a report to Audit & Scrutiny Committee where a ‘no’ response has been entered against a recommendation, the CAE and elected members would have the opportunity to challenge this response from Management. 7.7.2 The organisational structure allows for direct communication between the Chief Audit Executive and the Chief Executive and the Chair of the Audit & Scrutiny Committee. 7.7.3 The full scope of internal audit responsibilities are covered in the annual report / opinion i.e. governance, risk management and control. 7.7.4 Moray Council’s Internal Audit Service fully conforms to the Standard on Communicating the Acceptance of Risk. Page 81
Page 82
12 Jackie Clark Chief Internal Auditor Perth & Kinross Council August 2024 Page 82
Page 83
13 APPENDIX A – SUMMARY OF ASSESSMENT REF PAGE No. ASSESSMENT AREA Fully Conforms Generally Conforms Partially Conforms Does Not Conform Section A Mission of Internal Audit and Core Principles Section B Definition of Internal Auditing Section C Code of Ethics Section D ATTRIBUTE STANDARDS 1000 Purpose, Authority and Responsibility 1100 Independence and Objectivity 1200 Proficiency and Due Professional Care 1300 Quality Assurance and Improvement Programme Section E PERFORMANCE STANDARDS 2000 Managing the internal Audit Activity 2100 Nature of Work 2200 Engagement Planning 2300 Performing the Engagement 2400 Communicating Results Page 83
Page 84
14 2500 Monitoring Progress 2600 Communicating the Acceptance of Risks TOTALS 13 1 0 0 Page 84
Page 85
15 APPENDIX B – EVIDENCE PACK • Completed self-assessment against the Public Sector Internal Audit Standards • Internal Audit Charter • Internal Audit Manual • Pentana system outputs • Organisational charts, Job descriptions • Links to relevant Committee reports • Relevant communication Page 85
Page 86
16 APPENDIX C – STAKEHOLDERS Stakeholder interviews were held with the following key members of staff and Elected Members: • D Lewis, Audit & Risk Manager (Chief Audit Executive) • T Laing, Senior Internal Auditor • J Lovie, Internal Auditor • R Burns, Chief Executive (former) • A McEachan, Head of Governance, Strategy & Performance • Councillor G Leadbitter, Chair of Audit & Scrutiny Committee Page 86
Page 87
17 APPENDIX D – ACTION PLAN ACTION PLAN – INTERML AUDIT FOLLOW UP REVIEW – JUNE 2025 No. Report Para Recommendation Management Response Responsible Officer / Agreed Completion Date 1 6.2.5 There is scope for improving clarity regarding reporting lines by explicitly stating reporting lines within the Audit Charter The Audit Charter will be updated to provide greater clarification regarding the rights of access for Internal Audit Section officers to documentation and to seek explanations from any officer regarding any issues in completing their duties Audit and Risk Manager / Agreed 30 November 2024 Follow Up Review Status Comment Implemented The Internal Audit Charter has been updated to include further reference to the administrative and functional reporting requirements of the Audit & Risk Manager (Chief Audit Executive (CAE)). In addition, greater clarity has also been included regarding the Audit and Risk Manager’s “rights of access” to members and senior management. The Audit and Scrutiny Committee approved the updated Audit Charter on 20 November 2024 (paragraph 10 of the minutes refers). No. Report Para Recommendation Management Response Responsible Officer / Agreed Completion Date 2 6.2.6 Furthermore, there is scope to consider the Chief Audit Executive’s delegated authority within the Scheme of Delegation The Scheme of Delegation will be updated to include the responsibility for the Audit and Risk Manager to act as the Head of Governance, Strategy and Page 87
Page 88
18 Chief Audit Executive for the delivery of internal audit services. Performance / Agreed 31 January 2025 Follow Up Review Status Comment Implemented The Scheme of Delegation has been updated to include reference to the requirement for the Audit and Risk Manager’s responsibility to deliver the internal audit service in accordance with the Public Sector Internal Audit Standards. The updated Scheme of Delegation was approved by full Council on 25 June 2025. No. Report Para Recommendation Management Response Responsible Officer / Agreed Completion Date 3 6.2.7 Where the Chief Audit Executive has roles and responsibility in addition to Internal Audit, this should be clearly communicated to the Audit & Scrutiny Committee and Senior Officers. The Audit Charter should be updated in this regard to ensure that there are clear arrangements for ensuring the independence and objectivity of the Int The updated Audit Charter was approved by the Audit and Scrutiny Committee on 20 November 2024 (paragraph 10 of the minutes refers).ernal Audit function. As detailed in the ‘management response’ to recommendation 1, the Audit Charter will also be updated to detail the separate roles of the Audit and Risk Manager within the Council. Audit and Risk Manager / Agreed 30 November 2024 Follow Up Review Status Comment Implemented The Internal Audit Charter has been updated to include reference of the requirement that any duties of the Audit and Risk Manager that fall outside internal auditing must not impact the requirement for independence or objectivity. Page 88
Page 89
19 No. Report Para Recommendation Management Response Responsible Officer / Agreed Completion Date 4 6.3.7 Consideration should be given to the size of the Internal Audit team in order to ensure that the Internal Audit Service meet its objectives for all organisations that it provides internal audit services to (as detailed in 6.3.2) Concerns regarding the current staffing resources of the Internal Audit Service to meet the auditing and also counter fraud requirements of the Council and partner organisations have already been highlighted to senior management and members. However, this issue will be raised again for consideration with senior management. Audit and Risk Manager / Agreed 30 September 2024 Follow Up Review Status Comment Part- Implemented In accordance with the Public Sector Internal Auditing Standards (PSIAS), the Audit and Risk Manager must ensure that internal audit resources are appropriate and sufficient. Where the Audit and Risk Manager believes that the level of resources will adversely impact the provision of the annual internal audit opinion, this must be brought to the attention of the Audit and Scrutiny Committee. Concerns were raised by the Audit and Risk Manager within the Annual Internal Audit Report to the Audit and Scrutiny Committee on 24 June 2025 (paragraph 6 of the minutes refers) regarding the level of staff resources. However, the recent appointment of a part-time temporary auditor should assist in meeting the increasing demands on the Service. . Critical Significant Routine Page 89
Page 90
Page 90